PREMIER ARCHITECTURE INC.
1 4 1 8 5 D a l l a s P a r k w a y , S u i t e 1 4 0 0 , D a l l a s , T X , 7 5 2 5 4 9 7 2 . 7 7 8 . 9 5 0 0 | w w w . p r e m i e r p m . c o m 1 Thursday, April 3, 2025
Town of Yountville
Attn: Kari Svanstrom, Contract Planner
6550 Yount Street
Yountville, CA, 94599
707.947.7609
Re: Permit LUP-25-01
Bardessono Hotel & Spa – Fitness Center Enclosure and Pool Deck Reno 6526 Yount Street
Yountville, CA, 94599
Ms. Svanstrom,
We are in receipt of the comments issued for the above-mentioned project. Please find below our response in bold print following each comment received.
PLANNING DEPARTMENT:
1. As noted above, the subject property has a Zoning Designation of Planned Development (PD). While this allows for some flexibility in Development Standards, the intent of Planning Development zoning is to consider the full development included in the PD zoning. Therefore, please provide any other known planned improvements that you are aware of so these may be included in the analysis of the site.
RESPONSE: There are no other planned improvements at this site.
2. Zoning Parameters/Development Standards – the Floor Area Ration (FAR) is not provided.
While staff can calculate this for you, please provide the following:
a. Total square foot of all buildings that are part of the hotel complex on the main parcel. b. Square footage of the single suite building at the southeast parcel. c. Square footage of the Spa building (if possible to include first floor square footage separately that would be appreciated, otherwise total square footage will work).
RESPONSE:
a. TOTAL SF OF ALL BUILDINGS ON MAIN PARCEL: 55,697 SF
b. ASSUMED FROM SITE PLAN TO BE 4,066 SF – DO NOT HAVE PLANS c. TOTAL SF OF SPA BUILDING: 7,005 SF, FIRST FLOOR: 6,560 SF
3. Please provide a construction strategy/management plan for the construction of the improvements, to include how / where materials will be staged; where construction vehicles will be parked; if any regular vehicle spaces (for staff or guests) will be utilized, a description / plan for where these vehicles will be accommodated during that time; PREMIER ARCHITECTURE INC.
1 4 1 8 5 D a l l a s P a r k w a y , S u i t e 1 4 0 0 , D a l l a s , T X , 7 5 2 5 4 9 7 2 . 7 7 8 . 9 5 0 0 | w w w . p r e m i e r p m . c o m 2 any areas that will be closed to public during construction; schedule, (anticipated length of construction and time of year if relevant); whether the pool facility will be in use at the time; any anticipated use of the public right-of-way (public streets, parking, closure of pathways, etc.).
RESPONSE: Please refer to attached Site Plan provided for staging and parking.
If there is anything further needed, please don’t hesitate to contact us at [email protected] or direct at 972.778.9297. We look forward to receiving your approval! Thank you!
Joyce Landwehr, Permit Coordinator
[email protected]
972.778.9297