Yountville City Council
August 5, 2025

Document
PowerPoint Presentation (Staff)
Meeting
August 5, 2025
Body
Yountville City Council
Original file
13.8 MB
Text extracted from the city's file for reading and search. Open the original on townofyountville.primegov.com. That file is the official record.

APPLICATIONS
LOCATION 1) Addition of a new 588 SF fitness
center on the 2nd floor of the Spa
Building
2) Modifications to furniture (cabanas) at
the pool deck
• Design Review application
• CEQA (Ca. Env. Quality Act):
§ Exempt under sections 15301 (minor
alterations to existing structures); and
15061(b)3 "common sense" exemption
6526 Yount Street – Bardessono Hotel

PLANNED DEVELOPMENT ZONING
• PD DISTRICT includes hotel site,
Bardessono Family Park, Affordable
Housing Site (light blue)
• PD Zones – due to mix of uses of a
larger parcel split into areas or parcels,
zoning set at time of MDP approval by
Council to allow flexibility
6526 Yount Street – Bardessono Hotel

ZONING MAP
• Replace existing temporary
fitness center (temporary
tent structure) on second
floor of Spa Building on east
side of site
• Modify some pool deck
furnishings (does not
require DR)
6526 Yount Street – Site

BRADESSONO

SITE PLAN

EXISTING FITNESS CENTER
6526 Yount Street – Existing Site
6526 Yount Street – Design Review
• Replace existing temporary
fitness center (temporary
tent structure) on second
floor of Spa Building on east
side of site
• Modify some pool deck
furnishings (does not
require DR)

PROPOSED SECOND FLOOR PLAN
• Limited views from off-site
6526 Yount Street – Design Review

VIEW OF SECOND FLOOR

FROM YOUNT ST

VIEW FROM ENTRY COURT

VIEW OF (E) FITNESS CENTER

FROM FINNEL ROAD
• Limited views from off-site
6526 Yount Street – Design Review

VIEW OF (E) FITNESS CENTER

FROM HOUSING PARKING LOT

VIEW NORTH FROM SITE
6526 Yount Street – Design Review

VIEW FROM BARDESSONO

EASTERN DRIVEWAY
6526 Yount Street – Materials and Colors
Materials to match existing:

Stained cedar siding
Painted metal band
Corten and concrete block
6526 Yount Street – Construction Management
• Issues with construction parking at
off-site locations in prior permits.
• Parking management plan includes
arrangement to park at Seventh Day
Adventist church
• Use of staff parking (7 spaces) for
staging.
• Use of ROW for loading/unloading
requires Public Works approval
6526 Yount Street – ZDRB Review
• No issues with design or additional square footage
• Agreed with Staff regarding need for Construction Management, particularly regarding parking requirements.
• Unanimously adopted ZDRB Resolution 25-030 recommending Town Council approve the application.

Recommendation
1) Hold a Public Hearing
2) Adopt Resolution 25-030:

Recommending the Town Council Approve the
Design Review application and Find the Project
Exempt under CEQA Sections 15301 and 15061(b)3
exemption, with the following key conditions:
• Construction Management Plan conditions which require parking plan, loading plan to minimize traffic and parking congestion
• No parking allowed at City parking lots (inc. Comm center)