Project Description Location of each proposed project*
Engineer's
Estimate
Project’s
Estimated
Completion Useful Life
Trail Improvements $5,000 FY26/27 40
Hopper Creek $25,000 FY26/27 40
Yountville Cross Roads $8,500 FY26/27 40
Various locations as needed. $8,500 FY26/27 40
Paving Projects-Engineering and
Construction Various locations as needed to supplement Measure U project list. $55,000 FY26/27 10+ Total $102,000
* All locations are an estimate and have yet to be finalized.
Curb, Gutter,Sidewalk, ADA Path and or
Ramp Replacement
Exhibit A
SB 1 List of Projects FY 26/27
Town of Yountville
FY Proposed Title Description Location Components Est Start Est Completion
Est Useful Life Assembly Senate Est. Cost
26/27
Curb, Gutter,
Sidewalk, ADA Path
and or Ramp
Replacement
This project will include: Sidewalk and/or Crosswalk Installation (New), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Preparation, ADA Curb Ramp Installation (New), Repair of pedestrian hazards on pedestrian trail, Preliminary Design Trail Improvements,.Hopper Creek Path,Yountville Cross
Roads, * All locations are an estimate and have yet to be finalized. Pre-Construction
and Construction
7/25/2026
08-2026
11/2026
08/2027 20-40 40 3 $100,000
26/27
Paving ProjectsEngineering and
Construction
This project will include: Environmental Study/Documents, Cost Estimating, Pavement Rehab/Repair (Existing), Document Preparation, Paving and/or Striping Rehab/Repair (Existing Safety)
Various locations as needed to supplement Measure U
project list, Californai Drive, Yountville Cross Road. All locations are an estimate and have yet to be finalized.
Pre-Construction
and Construction
07/2026
12/2026
10/2026
08/2027
5-15 40 3 $60,000
Exhibit A- FY 2026-27 Proposed Project List SB1: The Road Repair Accountability Act