BID ITEM LIST (Revised 05/07/2025)
Base Bid Schedule
Bid
Item Item Description Quantity Unit
Unit
Price Total Price
1 Mobilization/Demobilization 1 LS 125,000 125,000.00
2 Construction Area Signs 1 LS 2,000 2,000.00
3 Temporary Construction Fencing 645 LF 5 3,225.00
4 Erosion & Sediment Control BMPs 1 LS 7,000 7,000.00
5 Demolish and Dispose of Existing AC 6,220 SF 6 37,320.00 6 Demolish and Dispose of Existing Concrete (Includes
sidewalk, curb and gutter, and wall per plan) 1,502 SF 20 30,040.00 7 Remove and Stump Grind Existing Trees 12 EA 3,000 36,000.00 8 Clear and Grub (Includes Turf and Existing Landscaped Areas) 8,480 SF 5 42,400
9 Demo and Remove Existing Utilities Per Plan (Includes water vault, water meters and backflow preventers marked for removal, drain inlet, light posts and related
appurtenances, and existing irrigation [remove spray
heads, and cap lines]) 1 LS 18,000 18,000.00
10 Cut and Cap Water Tower Downpipe Per Plan 1 LS 8,000 8,000 11 Remove and Dispose of ADA Parking Signs 2 EA 200 400.00 12 Grading 1 LS 110,000 110,000.00
13 Class II AB (3/4" Agg.) 220 TON 250 55,000.00
14 Concrete Flatwork – Includes: All paths, walkways, ramps, stairs, stage area, and brick inlay areas. Color & finish per plan 5,560 SF 40 222,400.00
15 Concrete Stage Wall 61 LF 690 42,090.00
16 Parking Area Concrete – Includes: ADA parking stalls, curb, gutter, parking bumpers, and new ADA sign with
black telespar posts per plan 740 SF 45 33,300.00
17 Parking Lot AC Conform Areas (Type A HMA 1/2”
Aggregate) 355 SF 50 17,750.00
18 Stabilized Decomposed Granite (Includes Steel Header Installation), 3" depth 590 SF 13 7,670.00
19 Non-Stabilized Decomposed Granite, 3" depth 6,650 SF 4 26,600.00 20 Artificial Turf at Amphitheater Area 1,140 SF 32 36,480 21 Artificial Turf at Play Area (Includes Fall Material Base) 895 SF 38 34,010.00 22 Pre-Cast 30” Seatwalls – Universal Precast or Equal
(Includes Seatwall with Park Name Embedded) 133 LF 1,500 199,500 23 Steel Hand Rail at Amphitheater – Powder Coat Black 48 LF 470 22,560.00
24 Decorative Digital Event Board 1 LS 112,000 112,000
25 Gateway Arch 1 LS 475,000 475,000
26 Berliner Globe Play Element 1 EA 115,000 115,000.00
27 Trash & Recycle Receptacle – Victor Stanley SD-242 – Black – with Rain Bonnets, top band and lid labels “Trash” and “Recycle”, and galvanized steel can liners; or equal (Plaza Area) 3 EA 7,500 22,500
28 Soil Testing and Amendments 1 LS 12,000 12,000.00
29 Relocate Existing Smoke Trees 3 EA 4,000 12,000.00
30 Tree – 15 Gal 21 EA 440 9,240.00
31 Tree – 60” Box 1 EA 7,500 7,500.00
32 Shrub – 1 Gal 147 EA 65 9,555.00
33 Shrub – 2 Gal 39 EA 90 3,510.00
34 Shrub – 5 Gal 109 EA 125 13,625.00
35 Shrub – 15 Gal 17 EA 245 4,165.00
36 Vine – 1 Gal 9 EA 90 810.00
37 Vine – 5 Gal 4 EA 125 500.00
38 Irrigation and Testing (Includes all pipe, fittings, sensors, controllers, conductors, boxes, valves, etc.) 1 LS 85,000 85,000.00 39 90 Day Landscape Maintenance 1 LS 4,500 4,500.00
40 120V Quadplex Receptacles with Taymac Weatherproof
Cover; or Equal 6 EA 100 600.00
41 FX Luminaire MO-RD per plan; or Equal 15 EA 1,260 18,900 42 FX Luminaire KT per plan; or Equal 12 EA 1,740 20,880 43 FX Luminaire XA-70 per plan; or Equal 10 EA 1,500 15,000 44 FX Luminaire PS per plan; or Equal 1 EA 850 850
45 FX Luminaire Lighting Controller LUX 300-M; or Equal 1 EA 7,500 7,500 46 Provide and install conduits, conductors, pull boxes, necessary for electrical components. Connect to existing point of connection 1 LS 227,000 227,000
Total Base Bid Schedule: $1,739,985.00
Alternate Bid Schedule 1: Cost Deductions
Bid
Item Item Description Quantity Unit
Unit
Price
Total Price
47 Install Concrete Flatwork In lieu of Artificial Turf at Amphitheater Area 1 LS 28,504 28,504.00
48 Install Concrete Flatwork In lieu of Pre-Cast 36" Concrete Seatwalls 1 LS 16,268 16,268.00
Total Alternate Bid Schedule 1: $28,504.00
Total Contract Amount: $1,768,489.00
ATTACHMENT 2
Agenda Item 16
CITY OF YUBA CITY
STAFF REPORT
Date: May 20, 2025
To: Honorable Mayor & Members of the City Council;
From: Development Services Department
Presentation By: Doug Libby, Deputy Director of Development Services Summary
Subject: Plumas Street Overlay District
Recommendation: Initiate a Municipal Code amendment to establish an Overlay District in downtown Yuba City from Colusa Avenue (State Hwy 20) to Bridge Street and along Center Street, to prohibit new tobacco and vape retailers as well as the sale of alcohol for offsite consumption to promote better health, entertainment, and a family friendly environment
Fiscal Impact: No direct fiscal impact will result from amending the Municipal Code to establish an overlay district as existing budgeted monies will be used for this effort Purpose:
To initiate a Municipal Code amendment to establish an overlay district in downtown Yuba City along the Plumas Street commercial corridor from Colusa Avenue (State Hwy 20) to Bridge Street and along Center Street, to prohibit certain commercial uses to reflect a direction and path for the downtown to promote better health, entertainment, and a family friendly destination.
Council’s Strategic Goal:
This item is consistent with the Council’s Public Safety Strategic Goal because restricting certain uses and establishing appropriate standards will enhance public safety in the community.
This item is also consistent with the Council’s Business Friendly Strategic Goal. Establishing appropriate uses for our downtown business district to promote better health, encourage entertainment, and a family-friendly destination is consistent with the Council’s Business-Friendly Strategic Goal.
Background:
The City and Downtown Business Association (DBA) have made significant investments in the downtown Plumas Street area over the last 30 years to create a vibrant downtown shopping district.
The City Council has supported further development of this downtown district to include additional restaurants and other entertainment opportunities. In 2024, the City Council approved a noise exception allowing for additional entertainment opportunities in the Plumas Street area from Colusa Avenue (State Hwy 20) to Bridge Street and along Center Street.
Proposal:
The City recently received separate letters from the DBA and Blue Zones Project requesting the City consider restricting certain uses in the downtown business corridor from Colusa Avenue (State Hwy 20) to Bridge Street. The basis of the request is to prohibit certain commercial uses to promote better health, entertainment and a family-friendly destination.
The restriction of the following activities is proposed:
• Tobacco and vape product sales – businesses commonly referred to as “smoke shops.” • Prohibit the sale of alcohol for offsite consumption.
If one of these activities occurs today, that business can continue. However, if the use were to cease for a period of one year or more, Municipal Code Section 8-5.7302(d) would prohibit the use from reestablishing.
The intent of prohibiting alcohol sales for offsite consumption is not to impact restaurants in the downtown, having lawfully established outdoor dining consistent with Municipal Code Title 8, Chapter 5, Article 49 (the City’s Outdoor Dining Ordinance).
Should the Council desire to implement such restrictions, Staff propose establishing an overlay zone covering properties zoned Community Commercial (C-2) District within the DBA area from Colusa Avenue (State Hwy 20) to Bridge Street and along Center Street. An overlay district is a land-use planning tool that adds additional requirements or limits uses of specific properties and is in addition to the property’s existing zoning.
A draft ordinance is required to first be considered by the Planning Commission at a noticed public hearing and a recommendation provided for the City Council’s consideration.
Fiscal Impact:
No additional fiscal impact will result from amending the Municipal Code to establish an overlay district over the downtown Plumas Street area. Existing budgeted monies are paying for staff time to address this matter.
Alternatives:
The City Council may determine not to initiate a Municipal Code amendment to establish an overlay district over the Plumas Street area to limit certain uses. The City Council may provide alternate direction to staff concerning this matter.
Recommendation:
Initiate a Municipal Code amendment to establish an Overlay District in downtown Yuba City from Colusa Avenue (State Hwy 20) to Bridge Street and along Center Street, to prohibit new tobacco and vape retailers as well as the sale of alcohol for offsite consumption to promote better health, entertainment, and a family friendly environment.
Attachments:
1. Map of Downtown Business Association Area
2. Blue Zones Project and Downtown Business Association Letters Received
Prepared By: Submitted By:
Doug Libby, AICP
Deputy Development Services Director
Robert Bendorf
Interim City Manager
ATTACHMENT 1
PLUMAS
ST
BRIDGE ST
SHASTA ST
PLUMAS
ST
20 BRIDGE ST
A ST
KILEY AVE
ROCKHOLT
WAY
FREMONT WAY
REEVES AVE
FORBES AVE
TEEGARDEN AVE
CHURCH ST
ALM
O
N
D
S
T
FRANCIS
WAY
SCOTT ST
WALN
U
T
S
T
AYLOR AVE
C
E
M
E
T
E
RY
WAY
CENTER ST
20 WALN
U
T
S
T
20 ALM
O
N
D
S
T
20 WALN
U
T
S
T
²
PROPERTIES SUBJECT TO PROPOSED ORDINANCE
Legend
Properties within the Downtown Business Association, subject to the proposed Ordinance HWY
20
ATTACHMENT 2
April 10, 2025
Doug Libby, AICP
Deputy Director of Development Services
City of Yuba City
1201 Civic Center Blvd.
Yuba City, CA 95993
RE: Request to Establish Commercial Overlay Zone for Plumas Street Dear Mr. Libby,
On behalf of the Blue Zones Project Yuba Sutter, I am writing to express our strong support for creating a Commercial Overlay Zone for the Plumas Street commercial corridor, spanning from Colusa Avenue to Bridge Street. We respectfully urge the City to take proactive steps in restricting uses incompatible with our shared vision for a vibrant, healthforward, and family-friendly downtown district.
We are particularly concerned with the continued presence and expansion of tobacco and vape retailers on Plumas Street. These establishments contradict our community’s efforts to promote well-being and pose significant risks to youth and public health. For this reason, we request that tobacco and vape retail establishments—commonly referred to as “smoke shops”—be prohibited within the overlay zone.
Tobacco retail density has been shown to increase rates of youth initiation and adult tobacco use, undermining the very public health efforts that Blue Zones Project and the City have worked to promote. The normalization of tobacco use through retail visibility, especially in pedestrian-oriented areas where families, youth, and visitors gather, is harmful and inconsistent with our community goals.
We also recommend restricting businesses that primarily sell alcohol for off-site
consumption, as they can similarly detract from the area’s appeal and safety.
Plumas Street has become a cornerstone of our downtown identity—a place where people come to connect, dine, shop, and experience the heart of our city. The continued revitalization of this area depends on a thoughtful approach to business mix and land use.
Creating a commercial overlay that prevents uses inconsistent with a healthy, walkable, and inviting environment is an important next step.
At Blue Zones Project Yuba Sutter, we are committed to transforming the environments where people live, work, and play. Our goal is to make the healthy choice the easy choice— and that starts with shaping public spaces like Plumas Street to reflect the values and needs of the people who call this community home.
We fully support the Downtown Business Association in this effort and welcome the opportunity to collaborate with the City as you prepare a staff report and consider an ordinance to create this overlay. We stand ready to provide data, community feedback, and policy support as needed.
Thank you for your leadership and consideration of this important request. Together, we can ensure that Plumas Street remains a place where health, community, and local pride thrive.
Sincerely,
Marni Sanders
Marni Sanders
Executive Director
Blue Zones Project Yuba Sutter
Agenda Item 17
CITY OF YUBA CITY
STAFF REPORT
Date: May 20, 2025
To: Honorable Mayor & Members of the City Council;
From: Development Services Department
Presentation By: Ben Moody, Public Works & Development Services Director Summary
Subject: Planning Division Fee Schedule Update
Recommendation:
A. Conduct a Public Hearing to receive comments on a proposed Planning Fee Schedule Update and after consideration;
B. Adopt a Resolution amending the Schedule of Fees and Charges for Planning Services beginning fiscal year 25/26
Fiscal Impact: A potential increase in cost recovery of approximately $123,900 annually Purpose:
To adjust planning service fees to recover City costs of providing services and to align with comparable services in the region.
Council’s Strategic Goals:
This item addresses Council’s Strategic Goal of Fiscal Responsibility.
Background:
The City’s Development Services Department provides necessary planning entitlement services to residents and developers within the City, through the Planning Division.
The Planning Fee Schedule is adjusted using the Consumer Price Index (CPI) for all urban consumers on an annual basis along with the City’s Master Fee schedule. However, the last time that the planning fees were analyzed and adjusted to reflect cost recovery was in September 2001. In the time since, there have been significant changes in the development processes within the City and State, the cost of services, and the complexity of planning processes, which have contributed to a growing gap between the fees collected and the actual costs of providing planning services.
Analysis:
Staff reviewed the planning fees of ten (10) comparable cities. This review incorporated the City’s planning fees and compared them to both the mean and median planning fees in multiple entitlement categories. Yuba City’s current planning fees fall significantly below both the mean and median
amounts in all categories analyzed.
Staff additionally analyzed the actual costs of staff time to identify the recommended proposed fee update amounts. The proposed fees will not fully recoup actual costs at application, however, with the implementation of development, the City will receive long-term financial benefit through property taxes and potential sales tax dollars to offset original costs.
In addition to the proposed fee updates, Staff recommends deleting some categorical specifications under the planning entitlements, as well as adding in fees for Development Agreements, Administrative Permits, Ministerial Map processing, and an Undefined category. These changes are shown in the Proposed section of the Planning Fee Schedule attachment.
On December 17, 2024, Staff requested input from Council regarding updating the Planning Fee Schedule, specifically related to cost recovery and implementation timelines. Council directed Staff to return to Council with a Resolution on updating the Planning Fee Schedule that included implementing the proposed fees utilizing the City’s established timeline of updating department fee schedules on July
1. Council also directed staff to reach out to local developers who regularly do business within the City and gather their input on the proposed planning fee updates.
On April 4, 2025, Staff conducted a survey of input for the proposed planning fee update and emailed local developers and interested residents to provide access to the survey, as well as the proposed fees.
Staff requested input by April 25, 2025. Two responses were received and are summarized below:
1. Suggestion of incrementally increasing fees overtime.
2. Inquiry as to whether discounts would be available for affordable housing.
The Proposed Planning Fee Update Public Hearing was also noticed in the Appeal Democrat on May 6 and May 13, 2025, and data made available to any interested parties at the City Clerk’s office.
Fiscal Impact:
In FY 2023-2024, the City collected approximately $117,000 in planning fees. If services provided stay consistent, the proposed Planning Fee Schedule will increase those fees by approximately $123,900, to total $240,900 per year. This is an estimate, as services required vary by year.
Alternatives:
Provide Staff alternative direction related to updating Planning service fees.
Recommendation:
1. Conduct a Public Hearing to receive comments on a proposed Planning Fee Schedule Update and after consideration;
2. Adopt a Resolution amending the Schedule of Fees and Charges for Planning Services beginning fiscal year 25/26.
Attachments:
1. Resolution - Planning Fee Schedule Update
2. Proposed Planning Fee Schedule
3. Comparable Cities Planning Fees
4. Actual Costs - Planning Fees
5. Proof of Publication - Planning Fee Update
Prepared By: Submitted By:
Shannon Sardo
Administrative Analyst II
Robert Bendorf
Interim City Manager
ATTACHMENT 1
RESOLUTION NO. _________
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF YUBA CITY
AMENDING THE SCHEDULE OF FEES AND CHARGES FOR PLANNING SERVICES WHEREAS, the City’s Development Services Department provides planning entitlement services through the Planning Division; and
WHEREAS, the Planning Fee Schedule is adjusted annually for inflationary changes and as needed for changes to services offered by the City; and WHEREAS, the current fees charged for planning services were established by Council in September 2001 following an evaluation of city charges to ensure cost recovery; and WHEREAS, since the last fee update, significant changes have occurred in development within the City, cost of services, and the complexity of planning services required; and WHEREAS, Development Services staff has reviewed and conducted analysis on ten (10) comparable cities’ charges to recommend updated fees for planning services; and WHEREAS, the recommended changes to the Planning Fee Schedule are fair and reasonable for customers and provide appropriate cost recovery for the Planning operating budget, and require an amendment to the Planning Fee Schedule.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Yuba City as follows:
1. The City Council authorizes the Finance Director to amend Section I. Development Services - Planning of the User Fee Schedule for Fiscal Year 24/25 as attached in Attachment 2 and incorporated herein.
2. The City Council resolves that the amended User Fee Schedule for planning shall take effect on July 1, 2025.
3. The City Council authorizes the Finance Director to apply a Consumer Price Index inflation factor to Section I. Development Services - Planning annually at the beginning of each fiscal year, rounded to the nearest dollar.
The foregoing Resolution was duly and regularly introduced, passed, and adopted by the City Council of the City of Yuba City at a regular meeting thereof held on the 20th day of May 2025.
AYES:
NOES:
ABSENT:
________________________________
Dave Shaw, Mayor
ATTEST:
________________________
Ciara Wakefield, Deputy City Clerk
APPROVED AS TO FORM
COUNSEL FOR YUBA CITY:
______________________________
Shannon L. Chaffin, City Attorney
Aleshire & Wynder, LLP
ATTACHMENT 2
Effective (unless otherwise noted)
July 1, 2024
Feb 2023 CPI 3.2%
Fee Actual Costs Proposed Fee
General Plan Amendments Text and Map Changes 3,407.13 $ 12,459 $ 9,450Master Plans New Plans Required varies $10K deposit and Actual Costs + Advanced Funding Agreement Specific Plans New Plans Required varies $10K deposit and Actual Costs + Advanced Funding Agreement Master/Specific Plan 3,407.13 varies $2K deposit and Actual Costs + Advanced Funding Agreement (Text & Map)Rezoning Map Change 3,407.13 $ 11,663 $ 8,400 Text Change 3,407.13 (delete)If rezone is associated with a general plan amendment 50% reduction $ 4,200 Planned Developments 2,491.96 $ 12,663 $ 8,400Land Divisions Subdivision Map 5,117.99 $ 14,394 $ 6,500 plus $29 per lot over 4 varies plus $30 per lot over 4
(New Fee) Subdivision Map, Ministerial $ 3,250
Parcel Map 1,831.80 $ 10,286 $ 5,250
(New Fee) Parcel Map, Ministerial $ 2,625
Parcel Map Revision 480.91 $ 3,108 $ 1,890Subdivision Map Revision 945.76 $ 3,108 $ 1,890Subdivision Map Time Extension 450.30 $ 1,115 $ 1,050Parcel Map Time Extension 450.30 $ 1,115 $ 1,050Lot Line Adjustment 1,036.13 $ 2,077 $ 1,575 plus $72 per lot over 2 (delete)
Urban Lot Split Fee 1,036.13 $ 2,684 $ 2,625Certificate of Compliance 255.03 $ 2,547 $ 1,575 Use Permits Major (all projects other than minor use permits) 2,027.09 $ 11,655 $ 6,300 Minor (related to single-family residence or duplex parking wavier, signs, temporary coaches) 826.27 $ 6,523 $ 3,675Minor Amendments 826.27 $ 2,625 $ 1,260Major Amendments 2,027.09 $ 6,834 $ 1,575Time Extensions Minor 614.97 $ 1,026 $ 1,050 Major 614.97 $ 1,977 $ 1,050
Development Plans City Council Review 4,217.39 $ 12,663 $ 6,300 Planning Commission Review 3,616.97 $ 8,995 $ 3,675Staff Review (delete) Single Family, Duplex, Four-plex 59.75 (delete) Multi-family Residence 135.52 (delete) plus $6/unit over 4 (delete)
Commercial, Office 10,000 sq. ft. or less 285.63 (delete)Commercial, Office 10,000 sq. ft. or more 569.80 (delete)Industrial 10,000 sq. ft. or less 135.52 (delete)Industrial 10,000 sq. ft. or more 285.63 (delete)Time Extension 614.97 $ 1,253 $ 1,050 City of Yuba City Fee Schedule
I. DEVELOPMENT SERVICES – PLANNING
Effective (unless otherwise noted)
July 1, 2024 City of Yuba City Fee Schedule
Effective (unless otherwise noted)
July 1, 2024
Feb 2023 CPI 3.2%
Fee Actual Costs Proposed Fee
Variances Single Family Residential 412.40 $ 4,940 $ 2,100 Other 826.27 $ 7,326 $ 4,200
Zoning Clearance Zoning Clearances for Signs, Homes, Model Homes, and Telecommunications 59.75 $ 80 $ 75
Special Event Signage 59.75 (delete)
plus $150 Deposit (delete)
Minor (parcel maps, variances, minor & major use permits 676.20 $ 1,024 $ 1,000Major (subdivisions, general plan amendments, rezoning, 1,336.33 $ 6,450 $ 5,000*Does not include cost of special studiesEnvironmental Impact Reports Actual Costs $10K deposit and actual costs + advanced funding agreement Development Agreement(New Fee) New $ 9,928 $ 5,250
Amendment $ 4,479 $ 3,675Assignment (one developer to one developer) $ 1,564 $ 1,050Assignment (each developer) $ 4,380 $ 1,300 Administrative Permits $ 1,698 $ 1,050Misc. Project/Undefined Fee $500 deposit + actual costs (New Fee)
California Environmental Quality Act*
City of Yuba City Fee Schedule
I. DEVELOPMENT SERVICES – PLANNING
ATTACHMENT 3
General Plan Am Use Permits Environmental Review - N Appeals Planning Division Fees
ͲŽŵƉĂƌĂďůĞCities
Yuba City $ 2,027.09 3,407.13 $ 1,336.33 $ 931.24 $
Lincoln $ 10,000.00 10,000.00 $ 3,000.00 $ $ 3,000.00
Woodland $ 3,776.00 5,381.00 $ 2,532.00 $ $ 326.00
Tulare $ 5,133.00 5,410.00 $ 1,618.00 $ $ 1,118.00
Manteca $ 9,291.00 13,454.00 $ 3,148.00 $
West Sacramento $ 5,000.00 8,000.00 $ 1,000.00 $ 100.00 $ (most are deposits with reimbursement agreement)Rocklin $ 13,107.00 15,269.00 $ 7,298.00 $ $ 5,392.00 Lodi $ 5,001.93 5,802.00 $ 2,500.00 $ $ 1,502.34
Turlock $ 10,821.00 13,836.00 $ 2,250.00 $ $ 550.00
Madera $ 3,694.00 6,225.00 $ 488.00 $ $ 1,325.00
Davis $ 6,141.00 11,898.00 $ 4,623.00 $ 256.00 $
MEAN 9,527.50 $ 7,196.49 $ 2,812.11 $ 1,671.73 $
MEDIAN $ 5,637.00 9,000.00 $ 2,500.00 $ $ 1,221.50
1 STDEV below $ 3,874.88 5,668.11 $ 749.32 $ $ (20.85)
1 STDEV above $ 10,518.10 13,386.89 $ 4,874.90 $ $ 3,364.32 =Outlier =Unsure Category
Planning Division Fees
CitiesYuba CityLincolnWoodlandTulareMantecaWest Sacramento(most are deposits with reimbuRocklinLodiTurlockMaderaDavisMEANMEDIAN1 STDEV below1 STDEV above Rezoning / Planned Development Variances Parcel Map Subdivision Map Lot Line Adjustment $ 412.40 3,407.13 $ 1,831.80 $ 5,117.99 $ 1,036.13 $
$ 5,000.00 10,000.00 $ 6,000.00 $ 15,000.00 $ 2,000.00 $ $ 2,481.00 5,235.00 $ 2,897.00 $ 6,150.00 $ 471.00 $
$ 3,360.00 3,221.00 $ 2,639.00 $ 3,739.00 $ 1,227.00 $
$ 5,733.00 9,301.00 $ 12,299.00 $ 2,350.00 $
$ 4,000.00 8,000.00 $ 4,000.00 $ 8,000.00 $ 2,000.00 $ $ 7,642.00 14,930.00 $ 18,087.00 $ 2,625.00 $ $ 1,502.33 7,120.80 $ 5,940.47 $ 5,802.00 $ 1,245.55 $ $ 3,104.00 8,300.00 $ 7,283.00 $ 7,283.00 $ 182.00 $
$ 2,963.00 6,225.00 $ 1,069.00 $ 4,538.00 $ 405.00 $
$ 7,933.00 5,116.00 $ 3,070.00 $ 3,070.00 $
$ 3,558.07 8,036.98 $ 4,832.72 $ 8,396.80 $ 1,510.15 $
$ 2,000.00 8,000.00 $ 5,733.00 $ 6,716.50 $ 1,622.78 $
$ 1,746.09 4,716.53 $ 2,529.62 $ 3,332.01 $ 507.15 $ $ 5,370.06 11,357.42 $ 7,135.82 $ 13,461.59 $ 2,513.16 $ $ 1,756.13 5,407.99 $
Planning Division Fees
CitiesYuba CityLincolnWoodlandTulareMantecaWest Sacramento(most are deposits with reimbuRocklinLodiTurlockMaderaDavisMEANMEDIAN1 STDEV below1 STDEV above Zoning Clearance Map Revision Time Extension (UP, DP, TPM, TSM) Admin Permits Certificate of Com $ 480.91 59.75 $ 450.30 $ 255.03 $
$ 300.00 $ 3,000.00 2,500.00 $ $ 2,000.00 2,000.00 $ $ 892.00 $ 2,481.00 3,932.00 $ 369.00 $ $ 576.00 1,227.00 $ $ 1,036.00 1,462.00 $
$ 289.00 $ 3,531.00 2,668.00 $ $ 1,169.00
$ 1,000.00 1,000.00 $ 1,000.00 $ 600.00 $
$ 418.00 $ 5,913.00 $ 2,273.00 2,385.00 $
$ 375.86 $ 375.86 1,500.00 $
$ 90.00 $ 2,497.00 $ 963.00
$ 1,594.00 534.00 $ $ 630.00
$ 3,070.00 729.00 $ 2,016.00 $
$ 1,988.99 461.51 $ 2,320.16 $ 1,479.21 $ 1,100.29 $
$ 375.86 $ 2,045.50 2,000.00 $ $ 1,036.00 1,462.00 $
$ 138.63 $ 509.05 814.40 $ $ 344.04 703.13 $
$ 784.39 $ 4,131.28 3,163.57 $ $ 1,856.54 2,255.28 $
ATTACHMENT 4
Actual Cost Estimates - Planning Entitlements
Labor Advertising Fees Total(hours) (cost)
Attorney Director DS Deputy Associate Planner/Dev LAssistant Planner PW Deputy Engineer Tech General Plan Amendment 2 6 6 65 0 2 10 1,200.0 $ 0 $ 12,459.19 $ 1,502.9 600.00 $ 1,054.1 4 $ 6,713.85 4 $ - $ 369.66 $ 1,018.6 $ 0 Land Division (subdivision map) 2 6 6 65 0 8 24 600.00 $ $ 14,394.21 $ 1,502.9 600.00 $ 1,054.1 4 $ 6,713.85 4 $ - $ 1,478.6 $ 2,444.6 4 $ 4 Parcel Map 1 3 3 50 6 18 600.00 $ $ 10,285.50
$ 751.47 300.00 $ 527.07 $ 5,164.5 $ - 0 $ 1,108.9 $ 1,833.4 8 $ 8 Parcel Map Revision 0.75 0.75 1.5 12 1 4 600.00 $ $ 3,108.15 $ 187.87 225.00 $ 263.54 $ 1,239.4 $ - 8 $ 184.83 $ 407.44 $ Subdivision Map 2 6 6 65 8 24 600.00 $ $ 14,394.21
$ 1,502.9 600.00 $ 1,054.1 4 $ 6,713.85 4 $ - $ 1,478.6 $ 2,444.6 4 $ 4 Subdivision Map Time Extension 0.5 1 6 0.5 1 $ 1,114.95 $ 125.25 - $ 175.69 $ 619.74 $ - $ 92.42 $ 101.86 $
Parcel Map Time Extension 0.5 1 6 0.5 1 $ 1,114.95
$ 125.25 - $ 175.69 $ 619.74 $ - $ 92.42 $ 101.86 $
Lot Line Adjustment 010 8 0 1 8 - $ $ 2,076.52
$ 250.49 - $ - $ 826.32 $ - $ 184.83 $ 814.88 $
Urban Lot Split Fee 1 9 5 1 9 $ 2,683.82
$ 250.49 - $ - $ 929.61 $ 402.15 $ 184.83 $ 916.74 $
SB 9 210 8 0 1 8 - $ $ 2,676.52
$ 250.49 600.00 $ - $ 826.32 $ - $ 184.83 $ 814.88 $
Rezonings 2 6 6 65 0 1 4 1,200.0 $ 0 $ 11,663.20
$ 1,502.9 600.00 $ 1,054.1 4 $ 6,713.85 4 $ - $ 184.83 $ 407.44 $ Planned Development 2 6 6 65 0 2 12 1,200.0 $ 0 $ 12,662.91 $ 1,502.9 600.00 $ 1,054.1 4 $ 6,713.85 4 $ - $ 369.66 $ 1,222.32 $ Development Plan Review
DP City Council Review 2 6 6 65 2 12 1,200.0 $ 0 $ 12,662.91 $ 1,502.9 600.00 $ 1,054.1 4 $ 6,713.85 4 $ - $ 369.66 $ 1,222.32 $ DP Planning Commission Review 1.5 4 4 45 2 12 600.00 $ $ 8,994.75 $ 1,001.9 450.00 $ 702.76 6 $ 4,648.05 $ - $ 369.66 $ 1,222.32 $ Use Permits (major) 2 6 6 65 0 2 8 600.00 $ $ 11,655.47 $ 1,502.9 600.00 $ 1,054.1 4 $ 6,713.85 4 $ - $ 369.66 $ 814.88 $ Minor 1.2 3.6 3.6 39 0 0 0 600.00 $ $ 6,522.56
$ 901.76 360.00 $ 632.48 $ 4,028.31 $ - $ - $ - $
Minor Amendments 0.5 1 1 15 0.5 4 $ 2,625.39
$ 250.49 150.00 $ 175.69 $ 1,549.35 $ - $ 92.42 $ 407.44 $ Major Amendments 1.5 4 4 30 2 6 600.00 $ $ 6,834.24
$ 1,001.9 450.00 $ 702.76 6 $ 3,098.7 $ - 0 $ 369.66 $ 611.16 $ UP Time Extensions
Minor 0.5 0.5 5 0.5 2 $ 1,025.68
$ 125.25 - $ 87.85 $ 516.45 $ - $ 92.42 $ 203.72 $
Major 0.5 1 8 0.25 2 600.00 $ $ 1,977.18
125.245 175.69 826.32 0 46.2075 203.72
Actual Cost Estimates - Planning Entitlements
Labor Advertising Fees Total(hours) (cost)
Attorney Director DS Deputy Associate Planner/Dev LAssistant Planner PW Deputy Engineer Tech Variances
Single Family Residential 1.5 2 2 30 1 2 600.00 $ $ 4,939.61 $ 500.98 - $ 351.38 $ 3,098.7 $ - 0 $ 184.83 $ 203.72 $ Other 1.5 4.5 3 40 1 3 600.00 $ $ 7,326.29
$ 1,127.21 450.00 $ 527.07 $ 4,131.6 $ - 0 $ 184.83 $ 305.58 $ Zoning Clearance 1- $ $ 80.43
$ - - $ - $ - $ 80.43 $ - $ - $
Environmental Review 8 5 5 32 0 0 0 - $ $ 7,836.18
$ 1,252.45 2,400.00 $ 878.45 $ 3,305.2 $ - 8 $ - $ - $
CEQA Minor 0.5 1 7 $ 1,023.97
$ 125.25 - $ 175.69 $ 723.03 $ - $ - $ - $
CEQA Major 2 1 2 45 $ 600.00 $ 6,449.92
$ 250.49 600.00 $ 351.38 $ 4,648.05 $ - $ - $ - $
Appeals 4 2 2 16 0 0 0 600.00 $ $ 4,305.00
$ 500.98 1,200.00 $ 351.38 $ 1,652.6 $ - 4 $ - $ - $
Development Agreements
New 8 10 10 20 $ 1,200.00 $ 9,927.60
$ 2,504.9 2,400.00 $ 1,756.9 0 $ 2,065.8 0 $ - 0 $ - $ - $ Amendment 4 5 8 $ 1,200.00 $ 4,478.77
$ 1,252.45 1,200.00 $ - $ 826.32 $ - $ - $ - $
Assignment (one developer to one develope 11 4 $ 600.00 $ 1,563.65 $ 250.49 300.00 $ - $ 413.16 $ - $ - $ - $
Assignment (each developer) 4 7 8 $ 600.00 $ 4,379.75
$ 1,753.43 1,200.00 $ - $ 826.32 $ - $ - $ - $
Administrative Permits 001 3 8 0 0 - $ $ 1,129.00
$ - - $ 175.69 $ 309.87 $ 643.44 $ - $ - $
C of Compliance 0 1.5 0 10 0 1 8 - $ $ 2,408.35
$ 375.74 - $ 1,032.9 $ 184.83 0 $ 814.88 $
Time Extension 011 8 0 0 0 - $ $ 1,252.50
$ 250.49 - $ 175.69 $ 826.32 $ - $ - $ - $
Traffic study review 0 1.5 0 2 0 2 4 - $ $ 1,359.42
$ 375.74 - $ - $ 206.58 $ - $ 369.66 $ 407.44 $
ATTACHMENT 5
PROOF OF PUBLICATION
APPEAL-DEMOCRAT
1530 Ellis Lake Drive, Marysville, CA 95901 * (530) 749-4700 STATE OF CALIFORNIA * Counties of Yuba and Sutter
I am not a party to, nor interested in the above entitled matter. I am the principal clerk of the printer and publisher of THE APPEAL-DEMOCRAT, a newspaper of general circulation, printed and published in the City of Marysville, County of Yuba, to which Newspaper has been adjudged a newspaper of general circulation by The Superior Court of the County of Yuba, State of California under the date of November 9, 1951, No. 11481, and County of Sutter to which Newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Sutter, State of California under the date of May 17, 1999, Case No. CVPT99-0819. The Notice, of which the annexed is a copy, appeared in said newspaper on the following dates:
May 9 & 13, 2025
I declare under penalty of perjury that the foregoing is true and correct.
May 13, 2025
Date Signature
City of Yuba City Public Hearing
COPY:
CITY OF YUBA CITY
Planning Fee Update – Public Hearing
Notice is hereby given that the City Council will hold a public hearing on Tuesday, May 20, 2025, at 6:00 pm, or shortly thereafter at the City Hall Council Chambers, 1201 Civic Center Blvd., Yuba City, CA 95993 on the following item:
Update of the Development Services - Planning Fee
Schedule
The Development Services Department processes entitlement applications (General Plan amendments, rezonings, permits, development plans, tentative maps, etc.) in accordance with State law and collects fees in accordance with the City Council’s adopted fee schedule which was last updated in 2001. The City Council will review the existing fee schedule and consider adopting proposed revisions.
Copies of the supporting materials are available for public review at the City Clerk’s office at 1201 Civic Center Blvd., Yuba City, CA 95993. Please reach out to Shannon Sardo at [email protected] with any questions.
The Council Chambers are accessible by wheelchair. Reasonable accommodations for the disabled may be arranged with 72 hours advance notification to the City Clerk at (530) 822-4609, TDD (530) 822-4732.
May 6 & 13, 2025 Ad#00307470
Signature
going is true and corre
CITY OF YUBA CITY
Future Agenda Items
- Councilmember Cole
- Councilmember Kirchner
- Councilmember Pasquale
- Vice Mayor Boomgaarden
- Mayor Shaw
CITY OF YUBA CITY
Reports and Communications
The following reports and communication items are provided for the Council’s information. No action can be taken on items under this section unless the Council agrees to include it on a subsequent agenda
City Manager’s Report
CITY OF YUBA CITY
Reports and Communications
The following reports and communication items are provided for the Council’s information. No action can be taken on items under this section unless the Council agrees to include it on a subsequent agenda
City Council Reports
- Councilmember Cole
- Councilmember Kirchner
- Councilmember Pasquale
- Vice Mayor Boomgaarden
- Mayor Shaw
Adjournment