The City has adopted a Reasonable Accommodations Policy that provides a procedure for receiving and resolving requests for accommodation to participate in this meeting. Please visit yubacity.net ADA & Accessibility Resources page. If you need assistance in order to attend the City Council meeting, or if you require auxiliary aids or services, e.g., hearing aids or signing services to make a presentation to the City Council, the City is happy to help. Accommodations should be requested as early as possible as additional time may be required in order to provide the requested accommodation; 72 hours in advance is suggested. Please contact City offices at (530) 822-4817 or (TTY: 530-822-4732), so such aids or services can be arranged. Requests may also be made by email at [email protected] or [email protected] or mail City Clerk, 1201 Civic Center Blvd, Yuba City, CA 95993.
AGENDA
JULY 1, 2025
REGULAR MEETING
CITY COUNCIL
CITY OF YUBA CITY
5:30 P.M. CLOSED SESSION
SUTTER ROOM/VIRTUAL
6:00 P.M. REGULAR MEETING
COUNCIL CHAMBERS/VIRTUAL
MAYOR ● Dave Shaw
VICE MAYOR ● Marc Boomgaarden
COUNCILMEMBER ● Toni Cole
COUNCILMEMBER ● Michael Pasquale
COUNCILMEMBER ● Wade Kirchner
CITY MANAGER ● Robert Bendorf
CITY ATTORNEY ● Shannon L. Chaffin
1201 Civic Center Blvd
Yuba City CA 95993
Wheelchair Accessible
AGENDA
REGULAR MEETING
CITY COUNCIL - CITY OF YUBA CITY
JULY 1, 2025
5:30 P.M. CLOSED SESSION
SUTTER ROOM/VIRTUAL
6:00 P.M. REGULAR MEETING
COUNCIL CHAMBERS/VIRTUAL
Materials related to an item on this Agenda submitted to the Council after distribution of the agenda packet are available for public inspection in the City Clerk’s office at 1201 Civic Center Blvd., Yuba City, during normal business hours. Such documents are also available on the City of Yuba City’s website at www.yubacity.net, subject to staff’s availability to post the documents before the meeting.
The Council Chambers will be open for public attendance and participation. The meeting will also be live streamed for public viewing, but not participation, at the following link:https://yubacity-net.zoom.us/webinar/register/WN_G7wxZbp7QP6QWQivh5g54g. Emailed comments sent to [email protected] at least 24 hours before the meeting will be distributed to the City Council prior to the meeting. Please identify the Agenda item(s) addressed by the comments.
Public Comment:
Any member of the public wishing to address the City Council on any item listed on the closed session agenda, if any, will have an opportunity to present testimony to the City Council in the Council Chamber prior to the City Council convening into closed session. Comments from the public will be limited to three minutes. No member of the public will be allowed to be present once the City Council convenes into closed session.
Closed Session
A. Conference with Legal Counsel – Pending Litigation Pursuant to Government Code Section 54956.9(d)(1).
Case: Kevin Soto v. City of Yuba City et al, Sutter County Case No. CVCS23- 0002232 (personal injuries from auto incident)
B. Claimant: Stacey Julian, Claim No. 25-18
Agency claimed against: City of Yuba City
C. Liability Claim (Pursuant to Government Code §911.4) Application to File a Late Claim
Claimant: Kimberly Marquard, Claim 25-17
Agency Claimed Against: City of Yuba City
Regular Meeting
Call to Order
Roll Call
__ Mayor Shaw
__ Vice Mayor Boomgaarden
__ Councilmember Kirchner
__ Councilmember Pasquale
__ Councilmember Cole
Invocation/Inspiration
Pledge of Allegiance to the Flag
City Attorney's Report on Closed Session Items, City Attorney Shannon Chaffin Agenda Modifications
Ceremonial Presentations
1. Proclamation - July is Parks and Recreation Month
2. Swearing In Ceremony - Police Chief and Fire Chief
Public Communication
3. Appearance of Interested Citizens
You are welcome and encouraged to participate in this meeting. Public comment is taken on action items appearing on the Consent Calendar or Business Items on the Agenda when they are called. Public comment on any other items within the scope of the City’s jurisdiction, including items not listed on the Agenda will be considered at this time. Public comment is limited to three minutes per speaker. Members of the public submitting written requests at least 24 hours prior to the meeting will be allotted five minutes to comment per speaker. Repetitive comments may be limited, and large groups are encouraged to select representatives to express the opinions of the group.
Consent Calendar
All matters listed under Consent Calendar are considered to be routine and can be enacted in one motion. There will be no separate discussion of these items prior to the time that Council votes on the motion unless members of the City Council request specific items to be discussed or removed from the Consent Calendar for individual action.
4. Minutes of the June 17, 2025 Regular Meeting of the City Council Recommendation: Approve the Minutes of the June 17, 2025 Regular Meeting of the City Council
5. Local 1/AFSCME 57, Police First Level Managers and First Level Managers Side Letters
Recommendation: Adopt a Resolution approving side letters with Local 1/AFSCME 57, Police First Level Managers and First Level Managers for short-term disability benefits and a side letter with Local 1/AFSCME 57 for reporting of leave hours for Wastewater Treatment Facility Operators
6. Sewer System Management Plan Update Adoption
Recommendation: Adopt a Resolution adopting the City of Yuba City Sewer System Management Plan Update
7. Yuba City Landscape District No. 1 - Resolution of Intent Recommendation: A. Adopt the following Resolutions to continue the Maintenance Districts pursuant to the Landscaping and Lighting Act of 1972:
• Resolution Approving Engineer's Reports Yuba City
Landscape Maintenance District No.1
• Resolution of Intention to Levy and Collect Assessments, Yuba City Landscape Maintenance District No.1
B. Set a Public Hearing for July 15, 2025 at 6:00PM to establish assessments for Fiscal Year (FY) 2025-26
8. Yuba City Lighting and Landscape District Nos. 2-4 - Resolution of Intent Recommendation: A. Adopt the following Resolutions to Continue the Maintenance Districts, pursuant to the Landscaping and Lighting act of 1972:
• Resolution Approving Engineer's Reports, Yuba City
Lighting and Landscape Maintenance District Nos. 2, 3,
and 4
• Resolution of Intention to Levy and Collect Assessments, Yuba City Lighting and Landscape Maintenance District
Nos. 2, 3, and 4
B. Set a Public Hearing for July 15, 2025 at 6:00 PM to establish assessments for Fiscal Year (FY) 2025-26
9. Yuba City Lighting and Landscape District Nos. 5-6 - Resolution of Intent Recommendation: A. Adopt the following Resolutions to continue the Maintenance Districts, pursuant to the Landscaping and Lighting Act of 1972:
• Resolution Approving Engineer's Reports, Yuba City
Lighting and Landscape Maintenance District Nos. 5 and
6 • Resolution of Intention to Levy and Collect Assessments, Yuba City Lighting and Landscape Maintenance Districts
Nos. 5 and 6
B. Set a Public Hearing for July 15, 2025 at 6:00 PM to establish assessments for Fiscal Year (FY) 2025-26
10. Yuba City Residential Street Light Maintenance Districts - Resolution of Intent Recommendation: A. Adopt a Resolution Approving the Engineer’s Reports and Declaring Intention to Levy for Yuba City Residential Street Light Maintenance Districts, to continue the Residential Street Light Maintenance Districts, pursuant to the Benefits Assessment Act of 1982
B. Set a Public Hearing for July 15, 2025 at 6:00 PM to establish assessments for Fiscal Year (FY) 2025-26
11. Appointment to Regional Water Authority
Recommendation: Approve the Mayor's Recommendation for Executive Staff Representation for the Regional Water Authority effective
immediately
12. 2025 Council Assignments - Amended
Recommendation: Approve the Mayor’s Amended Assignments to Regional Boards and Committees for Calendar Year 2025
Business Items
13. Portable Road Barriers
Recommendation: Adopt a Resolution to:
A. Accept funding from Homeland Security in the amount of $65,000
B. Award the purchase of a 36-unit road barrier trailer kit from ARX Perimeters, in the amount of $73,503, with the finding it is in the best interest of the City
C. Authorize the Finance Director to make a supplemental appropriation in the amount of $73,503 to 2140-69201 and $65,000 to 100-43195. Additionally, a budget transfer in the amount of $8,503 from 227-Z69990 to 100-Z69980
14. Code Enforcement Citation Fines
Recommendation: A. Conduct a Public Hearing, and after consideration; B. Adopt a Resolution for the inclusion of unpaid Code
Enforcement citation fines on the secured tax roll in the same manner as the general taxes and directing that a lien also be placed on the subject properties
15. Community Development Block Grant 2025-2029 Consolidated Plan and 2025 Annual Action Plan
Recommendation: A. Conduct a Public Hearing to receive comments on the 2025- 2029 Consolidated Plan, 2025 Annual Action Plan, and 2024 Annual Action Plan Amendment and after consideration;
B. Adopt a Resolution approving the proposed 2025-2029
Consolidated Plan and 2025 Annual Action Plan and authorize staff to submit the required documents to the Department of Housing and Urban Development (HUD) for processing
Future Agenda Items
16. Future Agenda Items
Reports and Communications
The following reports and communication items are provided for the Council’s information. No action can be taken on items under this section unless the Council agrees to include it on a subsequent agenda
17. City Manager's Report
18. City Council Reports
Adjournment
Proclamation
of the City Council
July is Parks and Recreation Month
WHEREAS, Parks and Recreation make lives and communities better now and in the future; and WHEREAS, our Parks and Recreation programs are vitally important to establishing and maintaining the quality of life in our community, ensuring the health of all citizens, and contributing to the economic and environmental well-being of the region; and WHEREAS, residents value recreation as it provides positive alternatives for children and youth to reduce crime and mischief, especially during non-school hours, promotes the arts, increases social connections, aids in therapy, and promotes lifelong learning; and WHEREAS, through the hard work and dedication of our Park Maintenance staff, our parks provide access to the tranquility and stimulation of nature and the outdoors, as well as allow residents access to outdoor spaces for children and adults to play and be active; exercise and hold group sports; and
WHEREAS, the residents of the City of Yuba City, including children, youth, families, adults, seniors, businesses, community organizations, and visitors benefit from the wide range of parks, trails, open space, facilities, and Recreation programs, including Blackburn Talley Sports Complex, Gauche Aquatic Park, Feather River Parkway, Sam Brannan Pickleball Courts, Tennis Courts, and Bocce Courts, the Senior Center, and Youth and Adult Sports provided by the City of Yuba City; and WHEREAS, the City Council urges all its residents to recognize that Parks and Recreation enriches the lives of its residents and visitors, builds healthy, active communities that aid in the prevention of chronic disease, such as obesity, improve the mental and emotional health of all citizens, as well as adding value to the community’s homes and neighborhoods; and WHEREAS, the U.S. House of Representatives has designated July as Parks and Recreation Month.
NOW, THEREFORE, BE IT RESOLVED, that I, Dave Shaw, Mayor of the City of Yuba City and on behalf of the entire City Council of the City of Yuba City do hereby proclaim July 2025 as Parks and Recreation Month and in doing so, ask that the citizens of Yuba City use and enjoy its parks, trails, open spaces, facilities, and recreation opportunities.
Done this 1st day of July 2025, at the City of Yuba
City, County of Sutter, State of California
Swearing In and Badge Pinning Ceremony
CITY OF YUBA CITY
Public Communication
Members of the public may address the City Council on items of interest that are within the City’s jurisdiction. Individuals addressing general comments are encouraged to limit their statements.
Procedure
You are welcome and encouraged to participate in this meeting. Complete a Speaker Card located in the lobby and give to the Clerk, public comment is taken on action items appearing on the Consent Calendar or Business Items on the Agenda when they are called. Public comment on any other items within the scope of the City’s jurisdiction, including items not listed on the Agenda, will be considered at this time.
When a matter is announced, wait to be recognized by the Mayor to provide your comments to the Council. Comments should begin by providing your name and place of residence. A three minute limit is requested when addressing Council.
Request for additional time to address Council
Members of the public submitting written requests at least 24 hours prior to the meeting will be allotted 5 minutes to comment per speaker. Repetitive comments may be limited, and large groups are encouraged to select representatives to express the opinions of the group.
Procedure
When requesting to comment, please indicate your name and the topic and mail to:
City of Yuba City
Attn: City Clerk
1201 Civic Center Blvd
Yuba City CA 95993
Or email to:
Ciara Wakefield, City Clerk
[email protected]
Agenda Item 4
CITY OF YUBA CITY
STAFF REPORT
Date: July 1, 2025
To: Honorable Mayor & Members of the City Council;
From: Administration Department
Presentation By: Kristi Morales , Administrative Analyst Summary
Subject: Minutes of the June 17, 2025 Regular Meeting of the City Council Recommendation: Approve the Minutes of the June 17, 2025 Regular Meeting of the City Council Fiscal Impact:
Attachments:
1. 06-17-2025 Regular Meeting Minutes (DRAFT)
Prepared By: Submitted By:
Kristi Morales
Deputy City Clerk
Robert Bendorf
Interim City Manager
ATTACHMENT 1
MINUTES (DRAFT)
REGULAR MEETING
CITY COUNCIL - CITY OF YUBA CITY
JUNE 17, 2025
5:30 P.M. CLOSED SESSION
SUTTER ROOM/VIRTUAL
6:00 P.M. REGULAR MEETING
COUNCIL CHAMBERS/VIRTUAL
Call to Order
The Closed Session Meeting of the City Council was called to order by Mayor Shaw at 5:30 PM
Roll Call:
Present: Mayor Shaw and Councilmembers Boomgaarden, Cole, Kirchner, and Pasquale
Absent: None
Closed Session
A. Conference With Legal Counsel—Existing Litigation (Pursuant to Government Code Section 54956.9(d)(1))
Name of case: Flores (Garcia) v. City of Yuba City - Case number:
402104A9F7G- 0001
B. Liability Claim (pursuant to Government Code
§54956.95) Claimant: Alyssa Kassube, Claim
No. 25-16
Agency Claimed Against: City of Yuba City
No public comment received
Regular Meeting
Call to Order
The Regular Meeting of the City Council was called to order by Mayor Shaw at 6:01 PM Roll Call:
Present: Mayor Shaw and Councilmembers Boomgaarden, Cole, Kirchner, and Pasquale
Absent: None
Invocation/Inspiration
Spencer Fennell, Youth Pastor - Calvary Christian Center
Pledge of Allegiance to the Flag
Yuba City High School Student, Max (Unknown last name)
City Attorney's Report on Closed Session Items
No reportable action
Due to anticipated recusals, Consent Calendar Items 8 through 10 were considered and voted on separately.
Ceremonial Presentations
1. Recognition of Yuba City High School Boys Varsity Baseball State Champions Mayor Shaw presented certificates of achievement to the coaches and players of the Yuba City High School Baseball Team in recognition of their 2025 Division II Championship victory.
2. Proclamation - Trauma Intervention Program 30th Anniversary Mayor Shaw presented a proclamation to the TIP Program, honoring the organization and all its dedicated volunteers for their compassionate support and service to the Yuba-Sutter community.
3. Proclamation - Sutter County Museum 50-year Celebration Mayor Shaw presents a proclamation to Molly Bloom, Director and Curator of the Sutter County Museum; Debbie Reed, Non-Profit Board President; and the entire museum staff in honor of the Museum’s 50 years celebration.
Public Communication
4. Appearance of Interested Citizens
Phil Treanor spoke
Dale Whitmore spoke
Consent Calendar
Councilmember Kirchner moved and Councilmember Cole seconded the motion to approve Consent Calendar items 5-7 & 11-14.
5. Minutes of the June 3, 2025 Regular Meeting of the City Council Approve the Minutes of the June 3, 2025 Regular Meeting of the City Council
6. West Sanborn Unit 1 Subdivision – Subdivision Agreement and Final Map Approval
Adopt Resolution 25-060 approving the execution of a Subdivision Agreement with FOR California Development LLC, a Delaware limited
liability company providing for public improvements associated with the West Sanborn Unit 1 Subdivision Map, approving the West Sanborn Unit 1 Subdivision Final Map, accepting dedication of rights-of-way and easements shown thereon, and authorizing the filing of the map. [Subdivision is located at the northwest corner of Sanborn Road and Bogue Road.]
7. SACOG Four-County State Funding Program – Grant Application Signature Authority
Adopt the following Resolutions:
A. Resolution 25-061 authorizing the Public Works Director to submit a grant application to SACOG requesting funding under the Four-County State Funding Program for the Butte House and Tierra Buena Roundabout Project
B. Resolution 25-062 authorizing the Public Works Director to submit a grant application to SACOG requesting funding under the Four-County State Funding Program for the George Washington Pavement Rehabilitation Project
C. Resolution 25-063 authorizing the Public Works Director to submit a grant application to SACOG requesting funding under the Four-County State Funding Program for the UPRR Corridor Conversion Project - SR20 to Cooper Ave
[Items 8-10 were voted on separately]
11. Yuba City Residential Street Light Maintenance Districts - Annual Levy Initiation
Adopt Resolution 25-067 describing improvements and ordering the Engineer of Work to file a report regarding Yuba City Residential Street Light Maintenance Districts, to continue the Maintenance Districts pursuant to the Landscaping and Lighting Act of 1972.
12. SB 1 Road Maintenance and Rehabilitation Account Project List 2025-26 Adopt Resolution 25-068 adopting a list of projects for Fiscal Year 2025- 26 to be funded by Senate Bill 1: Road Repair and Accountability Act of 2017
13. Septage Receiving Station Equipment
Adopt Resolution 25-069 awarding the purchase of a Spiralift Model SR30 Septage Receiving Station and related equipment to Franklin Miller Inc. of Livingston, NJ in the amount of $400,000, including tax and contingency, with the finding that it is in the best interest of the City
14. Fiscal Year 2025-2026 Citywide Sole Source and Professional Services Purchases
Adopt Resolution 25-070 pre-authorizing the City Manager or designee to perform citywide sole source and professional service purchases from
July 1, 2025 through June 30, 2026 for specified items based on each purchase recommendation being in the best interest of the City The motion was passed unanimously
Consent Calendar 8-10
8. Yuba City Landscape District No. 1 - Annual Levy Initiation [Vice-Mayor Boomgaarden and Councilmember Pasquale recused themselves] Adopt Resolution 25-064 describing improvements and ordering the Engineer of Work to file a report regarding Yuba City Landscape Maintenance District No. 1, to continue the Maintenance Districts pursuant to the Landscaping and Lighting Act of 1972
The motion passed with a 3-0 vote (Boomgaarden & Pasquale recused)
9. Yuba City Lighting and Landscape District Nos. 2-4 - Annual Levy Initiation [Mayor Shaw recused himself]
Adopt Resolution 25-065 describing improvements and ordering the Engineer of Work to file reports regarding Yuba City Lighting and Landscape Maintenance District Nos. 2, 3, and 4, to continue the Maintenance Districts pursuant to the Landscaping and Lighting Act of 1972
The motion passed with a 4-0 vote (Shaw recused)
10. Yuba City Lighting and Landscape Districts 5 and 6 - Annual Levy Initiation [Councilmember Pasquale recused himself]
Adopt Resolution 25-066 describing improvements and ordering the Engineer of Work to file reports regarding Yuba City Lighting and Landscape Maintenance District Nos. 5 and 6, to continue the Maintenance Districts pursuant to the Landscaping and Lighting Act of 1972
The motion passed with a 4-0 vote (Pasquale recused)
Business Items
15. Adoption of the City of Yuba City’s Fiscal Year 2025-26 Operating and Capital Budgets and Fiscal Year 2025-26 Appropriations Limit A. Adopt Resolution 25-071 approving the proposed Fiscal Year 2025-26 Operating Budget
B. Adopt Resolution 25-072 approving the Fiscal Year 2025-26 Capital Improvement Program. Project Summaries by Funding Source are attached to the Resolution
C. Adopt Resolution 25-073 approving the City’s Appropriations Limit for
Fiscal Year 2025-26
Roll Call Vote (Items A, B, and C):
AYES: Mayor Shaw, Councilmembers Cole, Kirchner, and Pasquale NOES: Vice-Mayor Boomgaarden
The motion passed with a 4–1 vote (Boomgaarden opposed) Future Agenda Items
16. Future Agenda Items
Councilmember Kirchner requested a follow-up report regarding recent traffic accidents at the intersection of Cherry Street and Walton Avenue Reports and Communications
17. City Manager's Report
18. City Council Reports
- Councilmember Cole
- Councilmember Kirchner
- Councilmember Pasquale
- Vice-Mayor Boomgaarden
- Mayor Shaw
Adjournment
Mayor Shaw adjourned the Regular Meeting of the City Council at 8:06 PM ________________________________________
Dave Shaw, Mayor
ATTEST:
Kristi Morales, Deputy City Clerk
Agenda Item 5
CITY OF YUBA CITY
STAFF REPORT
Date: July 1, 2025
To: Honorable Mayor & Members of the City Council;
From: Human Resources Department
Presentation By: Gina Rowland, Interim Human Resources Director Summary
Subject: Local 1/AFSCME 57, Police First Level Managers and First Level Managers Side Letters
Recommendation: Adopt a Resolution approving side letters with Local 1/AFSCME 57, Police First Level Managers and First Level Managers for short-term disability benefits and a side letter with Local 1/AFSCME 57 for reporting of leave hours for Wastewater Treatment Facility Operators
Fiscal Impact: The short-term disability programs are paid for by participating employees' contributions. There is no additional cost to the City to approve the reporting of leave hours for Wastewater Treatment Facility Operators as employees would use existing leave accruals.
Purpose:
To approve the side letters with Public Employees' Union Local 1/AFSCME 57 (Local 1), Police First Level Managers and First Level Managers for short-term disability and reporting of leave hours for Wastewater Treatment Plant Operators.
Council's Strategic Goal:
These side letters address the City Council's Strategic Goals of being business friendly and infrastructure because the employees who are in these bargaining units provide services to the public and maintain and oversee the City's infrastructure.
Background:
State Disability Insurance
On February 20, 2024, Council approved the move to new short-term disability programs. Local 1, Police First Level Managers (on behalf of their non-sworn members) and First Level Managers elected to transition to the short-term disability program run by the State of California ("SDI"). Since employees began using SDI, Local 1 requested a meeting to discuss how benefits will be coordinated for those receiving SDI benefits. The purpose was to clarify the procedures for supplementing their disability benefit payments with their leave banks.
Reporting of Leave Hours for Wastewater Treatment Facility Operators On February 6, 2024, Council approved the Local 1 Memorandum of Understanding (MOU). The term of the MOU is February 10, 2024 through June 2026. On September 3, 2024, Council approved a side letter with Local 1 to change the shift schedules for Wastewater Treatment Facility Operators to 12- hour shifts (6:00 a.m. to 6:00 p.m., and 6:00 p.m. to 6:00 a.m.).
This new shift schedule amounts to an employee working three 12-hour shifts one week (36 hours), and three 12-hour shifts plus one 8-hour shift in the second week (44 hours) for a total of 80 hours in a pay period. In order for the graveyard shift to be covered from 6:00 p.m. to 6:00 a.m., employees assigned to graveyard and working their 8-hour day receive an additional four (4) hours of overtime each pay period (eight (8) hours plus four (4) hours overtime for a 12-hour shift). When a graveyard shift employee takes vacation or is sick on their 8-hour day, they lose the opportunity to work four hours of overtime. Also, existing MOU language in Section 19.10(b) states that an operator who is absent from work due to sickness or vacation will use leave accruals in proportion to their assigned shift and according to scheduled hours for each day they are absent.
Analysis:
State Disability Insurance
Eligible employees may elect to use their accrued leave to supplement disability benefit payments in order to receive the equivalent of a full paycheck (gross basis). Staff determined that it was necessary to clarify the process for employees who choose to use their accrued leave balances while receiving SDI payments.
Employees who wish to use accrued leave must notify Human Resources within five (5) business days of receiving their disability benefits, specifying the leave banks and the amount of SDI benefits received so that the City can determine the number of hours to be used. This clarification is intended to prevent inadvertent overpayments.
In the event of an overpayment, the employee will be notified and must promptly coordinate with the Finance Department to arrange repayment.
Reporting of Leave Hours for Wastewater Treatment Facility Operators The recommended side letter gives Wastewater Treatment Facility Operators assigned to a graveyard shift the option to use an additional four (4) hours of vacation or sick leave accruals when absent from work due to sickness or vacation on their 8-hour day. The additional four (4) hours of leave accruals would be paid at the straight-time rate, since the hours were not actually worked and are not reportable to CalPERS.
Fiscal Impact:
The short-term disability programs are paid for by participating employees' contributions. There is no additional cost to the City to approve the reporting of leave hours for Wastewater Treatment Facility Operators as employees would use existing leave accruals.
Alternatives:
1. Do not approve the side letters for short-term disability.
2. Do not approve the side letter for reporting of leave hours for Wastewater Treatment Facility Operators.
Recommendation:
Adopt a Resolution:
A. Approving the side letter with Local 1/AFSCME 57, Police First Level Managers and First Level Managers for state disability insurance
B. Approving the side letter for Local 1/AFSCME 57 for the reporting of leave hours for Wastewater Treatment Facility Operators
Attachments:
1. Resolution - Side Letters
2. FLM SDI side letter 7-1-25 final
3. Local 1 SDI side letter 7-1-25 final
4. PFLM SDI side letter 7-1-25 final
5. Local 1 side letter- WWTP Operators Reporting of Hours 7-1-25 final Prepared By: Submitted By:
Gina Rowland
Interim Human Resources Director
Robert Bendorf
Interim City Manager
4899-1198-3952.1 011024.002
ATTACHMENT 1
4899-1198-3952.1 011024.002
RESOLUTION NO. _______
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF YUBA CITY APPROVING THE SIDE LETTER WITH PUBLIC EMPLOYEES’ UNION, LOCAL 1/AFSCME 57 FOR CHANGES TO OPERATORS’ REPORTING OF LEAVE HOURS AND LOCAL 1/AFSCME 57, POLICE FIRST LEVEL
MANAGERS AND FIRST LEVEL MANAGERS FOR SHORT TERM
DISABILITY LEAVE UTILIZATION
WHEREAS, the City recognizes Public Employees’ Union, Local 1/AFSCME 57 (Local 1), Police First Level Managers and First Level Managers bargaining unit’s commitment to the City and its citizens while providing outstanding and dedicated service to all; WHEREAS, the City met and conferred with Local 1 regarding the reporting of used leave accruals for Wastewater Treatment Facility Operators who are assigned to the graveyard shift; WHEREAS, the City met and conferred with Local 1, Police First Level Managers, and First Level Managers to clarify the process to be followed when employees elect to use their accrued leave to supplement disability payments in order to receive the equivalent of a full paycheck (gross basis);
WHEREAS, the foregoing meet and confer efforts resulted in proposed changes, which have been memorialized in side letters approved by Local 1, Police First Level Managers and First Level Managers;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Yuba City as follows:
1) Adopt a Resolution approving:
A. The attached Local 1 side letter regarding Wastewater Treatment Facility Operators reporting of leave hours.
b. The attached Local 1, Police First Level Manager and First Level Manager side letters for short-term disability.
The foregoing Resolution of the City Council of the City of Yuba City was duly introduced, passed and adopted at a regular meeting thereof held on the 1st day of July 2025.
AYES:
NOES:
ABSENT:
________________________
Dave Shaw, Mayor
ATTEST:
_______________________
4899-1198-3952.1 011024.002
Ciara Wakefield, Deputy City Clerk
__________________________
Ian Sangster
Kronick, Special Counsel
4931-7782-8943.1 011024.002
ATTACHMENT 2
4931-7782-8943.1 011024.002
The City of Yuba City and the First Level Manager
Side Letter of Agreement to the
July 1, 2023 through June 25, 2027 MOU
The City of Yuba City ("City") and the First Level Managers (“FLM”) have met and conferred in good faith pursuant to the requirements of the Meyers-Milias-Brown Act with respect to this side letter amending their current Memorandum of Understanding ("MOU"), with a current term that runs from July 1, 2023 to June 25, 2027 as set forth below. This side letter to the MOU describes the Parties' full and complete agreement to transition to the California Short Term Disability Insurance (SDI) program according to the process described below, and to amend that MOU by adding the language as set forth below.
Side Letter Language- Upon approval of FLM’s application for coverage by the EDD Director, the City and FLM agree that Article 4.6- “Long Term Disability”- of the MOU will be amended as follows to incorporate SDI as the short-term disability plan for FLM:
The City provides a long-term disability program for employees.
As to short-term disability benefits, FLM has elected to transition away from the City’s short term disability program to in the CA State Disability Insurance (SDI) program, and subsequently the appropriate program application was submitted. Upon approval of the application, the City will begin withholding the required SDI contributions (including retroactive contributions to the beginning of the then-current SDI quarter) from the wages of all FLM employees. SDI benefits are not immediately available to FLM members, but rather will become available pursuant to applicable program requirements after contributions have been made for at least two SDI quarters (“the SDI Initial Contribution Period”). Based on submitting the SDI application in February 2024, the anticipated first date when SDI benefits claims could be filed would be July 1, 2024. However, the parties understand and agree that the initial benefit claim eligibility date is determined solely by EDD.
The City Program will continue to be available to FLM employees during the SDI Initial Contribution Period so long as they make or continue to make the contributions required to be withheld per the City’s Program. Assoon as FLM employees are eligible to submit claims for SDI benefits (the anticipated date being July 1, 2024), the City’s Program will no longer accept new claims from FLM employees, and no further City Program contributions will be required of FLM employees unless there are FLM employees with active City Program claims continuing to receive benefits (hereafter “City Program Holdover Claimants”). If there are City Program Holdover Claimants, the parties agree that FLM employees will continue to make City Program contributions for the duration that any City Program Holdover Claimants are receiving City Program benefits, after which time no further City Program contributions will be required of FLM employees.
4931-7782-8943.1 011024.002
Finally, it is agreed that for FLM employees receiving benefits under either a short or long-term disability insurance program, the employees may elect to use their accrued leave to supplement disability benefit payments in order to receive the equivalent of a full paycheck (gross basis). In no instance shall the combination of disability insurance payments and accrued leave or other City benefit payments exceed 100% of an employee’s typical paycheck based on working regularly-scheduled hours. Employees who wish to use accrued leave are required to notify Human Resources within five (5) business days of receipt of disability benefits to communicate the leave banks to be used and report the amount of SDI benefits received so that the City can determine the number of hours to be used. In the event of an inadvertent overpayment, the employee will be notified and must make immediate arrangements with Finance to repay the overpayment.
All other provisions of the MOU between the City and Union shall remain unchanged.
Date: ________________________ Date: _____________________
CITY OF YUBA CITY FLM
____________________________________ ___________________________________ Robert Bendorf, Interim City Manager Laci Heggstrom
____________________________________ ___________________________________ Gina Rowland, Interim Human Resources Director David Palmer ___________________________________
Rene Garcia
Laci Heggstrom (Jun 24, 2025 11:03 PDT)
Laci Heggstrom 06/24/2025 David Palmer (Jun 24, 2025 11:05 PDT) David Palmer
ATTACHMENT 3
The City of Yuba City and the Public Employees’ Union, Local 1/AFSCME 57 Side Letter of Agreement to the
February 10, 2024 through June 26, 2026 MOU
The City of Yuba City ("City") and the Public Employees’ Union, Local 1/AFSCME 57, on behalf of its bargaining unit employees ("Local 1"), have met and conferred in good faith pursuant to the requirements of the Meyers-Milias-Brown Act with respect to this side letter amending their current Memorandum of Understanding ("MOU"), with a current term that runs to June 26, 2026, as set forth below. This side letter to the MOU describes the Parties' full and complete agreement to transition to the California Short Term Disability Insurance (SDI) program according to the process described below, and to amend that MOU by adding the language as set forth below.
The City and Local 1 agree that Article 9-Employee Benefit Plans, 9.8, Short Term Disability Plan of the MOU will be amended as follows to incorporate SDI as the short-term disability plan for Local 1:
Local 1 has elected to transition away from the City’s short-term disability program to in the CA State Disability Insurance (SDI) program, and subsequently the appropriate program application was submitted. Upon approval of the application, the City will begin withholding the required SDI contributions (including retroactive contributions to the beginning of the then-current SDI quarter) from the wages of all Local 1 employees. SDI benefits are not immediately available to Local 1 members, but rather will become available pursuant to applicable program requirements after contributions have been made for at least two SDI quarters (“the SDI Initial Contribution Period”).
Based on submitting the SDI application in February 2024, the anticipated first date when SDI benefits claims could be filed would be July 1, 2024. However, the parties understand and agree that the initial benefit claim eligibility date is determined solely by EDD.
The City Program will continue to be available to Local 1 employees during the SDI Initial Contribution Period so long as they make or continue to make the contributions required to be withheld per the City’s Program. As soon as Local 1 employees are eligible to submit claims for SDI benefits (the anticipated date being July 1, 2024), the City’s Program will no longer accept new claims from Local 1 employees, and no further City Program contributions will be required of Local 1 employees unless there are Local 1 employees with active City Program claims continuing to receive benefits (hereafter “City Program Holdover Claimants”). If there are City Program Holdover Claimants, the parties agree that Local 1 employees will continue to make City Program contributions for the duration that any City Program Holdover Claimants are receiving City Program benefits, after which time no further City Program contributions will be required of Local 1 employees.
Finally, it is agreed that for Local 1 employees receiving benefits under either a short or long-term disability insurance program, the employees may elect to use their
accrued leave to supplement disability benefit payments in order to receive the equivalent of a full paycheck (gross basis). In no instance shall the combination of disability insurance payments and accrued leave or other City benefit payments exceed 100% of an employee’s typical paycheck based on working regularly-scheduled hours.
Employees who wish to use accrued leave are required to notify Human Resources within five (5) business days of receipt of disability benefits to communicate the leave banks to be used and report the amount of SDI benefits received so that the City can determine the number of hours to be used. In the event of an inadvertent overpayment, the employee will be notified and must make immediate arrangements with Finance to repay the overpayment.
All other provisions of the MOU between the City and Union shall remain unchanged.
Date: ________________________ Date: _____________________ CITY OF YUBA CITY Local 1
____________________________________ ___________________________________ Robert Bendorf, Interim City Manager Ron Slaven, Business Representative ____________________________________ ___________________________________ Gina Rowland, Interim Human Resources Director Joseph Santanna, President ___________________________________
Ashley Whitmore, Secretary
___________________________________
Rafael Mendoza, Treasurer
___________________________________
Maddy Laffond, Shop Steward
Rafael Mendoza (Jun 24, 2025 11:23 PDT) Maddy Laffond (Jun 24, 2025 11:30 PDT) Joe Santanna (Jun 24, 2025 12:29 PDT) Joe Santanna
ATTACHMENT 4
The City of Yuba City and the Police First Level Managers Side Letter of Agreement to the
July 1, 2023 through June 26, 2026 MOU
The City of Yuba City ("City") and the Police First Level Managers ("PFLM") have met and conferred in good faith pursuant to the requirements of the Meyers-Milias-Brown Act with respect to this side letter amending their Memorandum of Understanding ("MOU"), with a current term of July 1, 2023 through June 26, 2026 as set forth below. This side letter to the MOU describes the Parties' full and complete agreement to transition to the California Short Term Disability Insurance (SDI) program according to the process described below, and to amend that MOU by adding the language as set forth below.
Short-Term Disability
PFLM has elected to enroll its civilian, non-sworn members (“the Civilian Employees”) in CA State Disability Insurance (SDI) program and subsequently the appropriate program application was submitted.
Upon approval of the application, the City will begin withholding the required SDI contributions (including retroactive contributions to the beginning of the then-current SDI quarter) from the wages of all the Civilian Employees. SDI benefits are not immediately available to the Civilian Employees, but rather will become available pursuant to applicable program requirements after contributions have been made for at least two SDI quarters (“the SDI Initial Contribution Period”). Based on submitting the SDI application in February 2024, the anticipated first date when SDI benefits claims could be filed would be July 1, 2024. However, the parties understand and agree that the initial benefit claim eligibility date is determined solely by EDD.
The City Program will continue to be available to the Civilian Employees during the SDI Initial Contribution Period so long as they make or continue to make the contributions required to be withheld per the City’s Program. As soon as the Civilian Employees are eligible to submit claims for SDI benefits (the anticipated date being July 1, 2024), the City’s Program will no longer accept new claims from the Civilian Employees, and no further City Program contributions will be required of the Civilian Employees unless there are Civilian Employees with active City Program claims continuing to receive benefits (hereafter “City Program Holdover Claimants”). If there are City Program Holdover Claimants, the parties agree that all Civilian Employees will continue to make City Program contributions for the duration that any City Program Holdover Claimants are receiving City Program benefits, after which time no further City Program contributions will be required of the Civilian Employees.
Finally, it is agreed that Civilian Employees receiving benefits under either a short or long-term disability insurance program may elect to use their accrued leave to supplement disability benefit payments in order to receive the equivalent of a full paycheck (gross basis). In no instance shall the combination of disability insurance payments and accrued leave or other City benefit payments exceed 100% of an employee’s typical paycheck based on working regularly-scheduled hours. Civilian
employees who wish to use accrued leave are required to notify Human Resources within five (5) business days of receipt of disability benefits to communicate the leave banks to be used and report the amount of SDI benefits received so that the City can determine the number of leave hours to be used. In the event of an inadvertent overpayment, the employee will be notified and must make immediate arrangements with Finance to repay the overpayment.
All other provisions of the MOU between the City and Union shall remain unchanged.
Date: ________________________ Date: _____________________
CITY OF YUBA CITY PFLM
____________________________________ ___________________________________ Robert Bendorf, Interim City Manager Tim Talbot
Rains Lucia Stern
____________________________________ ___________________________________ Gina Rowland, Interim Human Resources Director Brian Thornton Timothy K. Talbot (Jun 24, 2025 11:44 PDT)
Timothy K. Talbot
4934-4475-6047.1 011024.002
ATTACHMENT 5
4934-4475-6047.1 011024.002
The City of Yuba City and the Public Employees’ Union, Local 1/AFSCME 57 Side Letter of Agreement to the
February 10, 2024 through June 26, 2026 MOU
The City of Yuba City (“city”) and the Public Employees’ Union, Local 1/AFSCME 57, on behalf of its bargaining unit employees (“Local 1”), have met and conferred in good faith pursuant to the requirements of the Meyers-Milias-Brown Act with respect to this side letter amending their current Memorandum of Understanding (“MOU”), with a current term that runs to June 26, 2026, as set forth below. This side letter to the MOU describes the Parties’ full and complete agreement with respect to reporting of leave hours by Water and Wastewater Treatment Plant Operators, and to amend that MOU by adding the language as set forth below.
19.10 Reporting and Allocation of Leave Hours
a. Water and Wastewater Treatment Plant Operators will report used leave accruals according to the date on which their shift would have started. b. An operator who is absent from work due to sickness or vacation will use leave accruals in proportion to their assigned shift and according to scheduled hours for each day they are absent. The sole exception is Wastewater Treatment Plant Operators who are assigned to a graveyard shift, who may use an additional four (4) hours of leave accruals when absent from work due to sickness or vacation on their 8-hour day, for a total of 12- hours of paid leave. The use of the additional four (4) hours of leave accruals is at the discretion of the employee. Notwithstanding Article 5 "Overtime," the use of the additional four (4) hours of leave accruals will not be considered hours worked and will be paid at the straight time rate. The additional four (4) hours is not considered reportable compensation to CalPERS.
All other provisions of the MOU between the City and Union shall remain unchanged.
Date: ________________________ Date: _____________________ CITY OF YUBA CITY Local 1
____________________________________ ___________________________________ Robert Bendorf, Interim City Manager Ron Slaven, Business Representative ____________________________________ ___________________________________ Gina Rowland, Interim Human Resources Director Joseph Santanna, President ___________________________________
Ashley Whitmore, Secretary
___________________________________
Rafael Mendoza, Treasurer
___________________________________ Maddy Laffond (Jun 24, 2025 11:08 PDT) Rafael Mendoza (Jun 24, 2025 11:25 PDT) Joe Santanna (Jun 24, 2025 12:28 PDT) Joe Santanna
06/24/2025 Page 32 of 588
4934-4475-6047.1 011024.002
Maddy Laffond, Shop Steward
Agenda Item 6
CITY OF YUBA CITY
STAFF REPORT
Date: July 1, 2025
To: Honorable Mayor & Members of the City Council;
From: Public Works
Presentation By: Kathy Willis, Environmental Compliance Manager Summary
Subject: Sewer System Management Plan Update Adoption
Recommendation: Adopt a Resolution adopting the City of Yuba City Sewer System Management Plan Update
Fiscal Impact: Staff time associated with implementing new state requirements reflected in the Sewer System Management Plan Update. Compliance with state regulations preserves the City's eligibility for various funding opportunities and minimizes potential fines.
Purpose:
To comply with the new Waste Discharge Requirements for sanitary sewer systems adopted by the State Water Resources Control Board.
Council's Strategic Goal:
This item addresses Council's Strategic Goal of maintaining and improving the City's Infrastructure by adopting a Sewer System Management Plan Update in compliance with state requirements.
Background:
The Sewer System Management Plan Update (SSMP) documents the City’s program to properly operate and maintain its sanitary sewer system.
In 2006, the State issued the first order requiring systems to develop SSMPs and systematically report sewage spills to the state.
Since 2008, the City has dramatically reduced the number and volume of sewage spills to the environment. This is a result of the City’s investment in rehabilitating and improving sewer infrastructure, acquisition of equipment and technology, and continual improvement in operational practices over time.
The State Water Resources Control Board issued an updated Sanitary Sewer Systems General Order in December 2022.
Analysis:
The reissued Order increases the focus on system resilience to minimize the number and volume of sewage spills contaminating the environment. The regulations require local agencies to improve resilience through condition assessments, identification of operational changes, prioritization of capital improvements, and addressing high-priority rehabilitation and repairs.
The new regulation also requires systems to submit certified audit reports on their program compliance to the State every three years. Staff is increasing training and working to update geographic information system (GIS) maps in order to comply with the new regulations.
Staff worked with the consulting firm Fischer Compliance to develop the SSMP. The plan must be updated every six (6) years.
Fiscal Impact:
Staff time associated with implementing new state requirements reflected in the Sewer System Management Plan Update. New regulations focus on increasing system resilience through prioritization of capital improvements and schedules to address high-priority rehabilitation and repairs. Compliance with state regulations preserves the City’s eligibility for various funding opportunities and minimizes potential fines.
Alternatives:
Provide staff direction regarding changes to the plan. Each Governing Board is required to approve a plan to meet the WDR requirements, therefore, there is no alternative without accepting regulatory noncompliance and associated fines.
Recommendation:
Adopt a Resolution adopting the City of Yuba City Sewer System Management Plan Update.
Attachments:
1. Resolution - Sewer System Management Plan Update
2. Yuba City SSMP Update 2025 Final including Appendices Prepared By: Submitted By:
Katherine Willis
Environmental Compliance Manager
Robert Bendorf
Interim City Manager
ATTACHMENT 1
RESOLUTION NO. ___
A RESOLUTION OF THE CITY COUNCIL OF YUBA CITY ADOPTING THE SEWER
SYSTEM MANAGEMENT PLAN UPDATE SUBJECT TO MINOR EDITORIAL
MODIFICATIONS
WHEREAS, the City Council of Yuba City recognizes the value of managing its wastewater collection system in a manner protective of the health of the community; and WHEREAS, the City of Yuba City is committed to ensuring the long-term sustainability of the sewer infrastructure; and
WHEREAS, the City of Yuba City has the authority to construct, operate, and maintain the wastewater collection system and is responsible for providing reliable wastewater conveyance to the community; and
WHEREAS, the State Water Resources Control Board has adopted Order No. 2022-0103- DWQ, Statewide Waste Discharge Requirements, General Order for Sanitary Sewer Systems; and
WHEREAS, an adopted Sewer System Management Plan Update is required to maintain compliance with the State Water Resources Control Board order effective June 5, 2023.
NOW THEREFORE, be it resolved and ordered by the City Council of the City of Yuba City that the City Council adopts the City of Yuba City Sewer System Management Plan Update subject to minor editorial modifications.
The foregoing Resolution was duly and regularly introduced, passed, and adopted by the City Council of the City of Yuba City at a regular meeting thereof held on the 1st of July, 2025.
AYES:
NOES:
ABSENT:
Dave Shaw, Mayor
ATTEST:
Ciara Wakefield, City Clerk
APPROVED AS TO FORM
COUNSEL FOR YUBA CITY:
Shannon Chaffin, City Attorney
Aleshire & Wynder, LLP
Exhibit(s):
A. Exhibit A – Sewer System Management Plan Update
EXHIBIT A
Sewer System Management Plan (SSMP)
2025 Update
Sanitary Sewer Collection System for Waste Discharge ID (WDID): # 5SSO11100 (Yuba City)
(WDID): # 5SSO11060 (Stonegate Village)
REVIEWED AND APPROVED BY:
Tim Bybee, Public Works Maintenance Superintendent
Legally Responsible Official
Yuba City
Sanitary Sewer Collection System
(includes Element Development Plans & Schedules)
Date Signed
THIS PAGE INTENTIONALLY LEFT BLANK
SSMP CHANGE LOG
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. COPY THIS PAGE AS NEEDED Revision
Date
SSMP
Section
Approval
Date Description of Change/Revision Made Initials
SSMP CHANGE LOG
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. COPY THIS PAGE AS NEEDED Revision
Date
SSMP
Section
Approval
Date Description of Change/Revision Made Initials
LETTER OF COMPLIANCE
© 2025 Fischer Compliance, LLC. All rights reserved. SSMP licensed for Yuba City use only. Page i City of Yuba City
Att: Tim Bybee
Legally Responsible Official (LRO)
1185 Market Street
Yuba City, CA 95991
Dear Mr. Bybee,
We are pleased to present the new 2025 Sewer System Management Plan (SSMP) Update developed in partnership with the City of Yuba City’s management. The 2025 Update meets and exceeds compliance with the WDR (State Water Board, Water Quality Order No. 2022-0103-DWQ, Attachment D-10 and Specifications 5.4). The 2025 SSMP has been completely revised to harmonize with industry standard guidelines and incorporates the City’s latest SSMP Audit findings.
The 2025 SSMP is a declaration of what the City is doing to demonstrate full compliance with the WDR. Attachment A of the WDR (page A-4), states “A sewer system management plan is a living document an Enrollee develops and implements to effectively manage its sanitary sewer system(s) in accordance with this General Order.” We suggest that the City review the SSMP on a regular basis, and as required by the WDR, continuously document changes to its SSMP in a change log attached to the Plan.
We look forward to assisting the City wherever necessary to fully implement the new 2025 SSMP Update.
Sincerely,
James Fischer, P.E.
Principal, Fischer Compliance LLC
Credentialed U.S. EPA NPDES Compliance Inspector
OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. SSMP licensed for City use only. Page ii
TABLE OF CONTENTS
INTRODUCTION.............................................................................................................................................................1 SSMP Organization ..................................................................................................................................................................... 4 Abbreviations and Acronyms...................................................................................................................................................... 5
1. GOAL AND INTRODUCTION ..................................................................................................................................6
1.1. Regulatory Context............................................................................................................................................................ 6
1.2. SSMP Update Schedule...................................................................................................................................................... 7
1.3. Sewer System Asset Overview........................................................................................................................................... 9 Specifications 5.2 – SSMP Development and Implementation ................................................................................................ 13 Specifications 5.7 – Allocation of Resources ............................................................................................................................ 14 Provisions 6.1 - Enforcement Provisions.................................................................................................................................. 15 Provisions 6.3 Sewer System Management Plan Availability ................................................................................................... 16
2. ORGANIZATION...................................................................................................................................................17
2.1. Organizational Chart........................................................................................................................................................ 20
2.2. Organizational Staffing Responsibilities........................................................................................................................... 21
2.3. Chain of Communication for Reporting Spills.................................................................................................................. 24
3. LEGAL AUTHORITY ..............................................................................................................................................27
4. OPERATION AND MAINTENANCE PROGRAM.....................................................................................................30
4.1. Updated Map of Sewer System....................................................................................................................................... 30
4.2. Preventive Operation and Maintenance Activities.......................................................................................................... 32
4.3. Training............................................................................................................................................................................ 34
4.4. Equipment Inventory....................................................................................................................................................... 36 Specifications 5.19 - Operations and Maintenance.................................................................................................................. 38
5. DESIGN AND PERFORMANCE PROVISIONS.........................................................................................................43
5.1. Updated Design Criteria/Construction Standards/Specifications.................................................................................... 43
5.2. Procedures and Standards............................................................................................................................................... 45
6. SPILL EMERGENCY RESPONSE PLAN...................................................................................................................47
7. SEWER PIPE BLOCKAGE PROGRAM ....................................................................................................................49
8. SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS........................................................53
8.1. System Evaluation and Condition Assessment................................................................................................................ 53
8.2. Capacity Assessment and Design Criteria........................................................................................................................ 56
8.3. Prioritization of Corrective Action ................................................................................................................................... 58
8.4. Capital Improvement Plan ............................................................................................................................................... 59
9. MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS...................................................................63
10. INTERNAL AUDITS ...............................................................................................................................................65
11. COMMUNICATION PROGRAM............................................................................................................................67 LIST OF APPENDICES ...................................................................................................................................................69
OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. SSMP licensed for City use only. Page iii
LIST OF FIGURES
Figure 1 - Collection Spill Summary: Operational Indices for Stonegate Village CS with State and Regional Data .....2 Figure 2 - Collection Spill Summary: Operational Indices for Yuba City CS with State and Regional Data...................3 Figure 3 - Sewer System Management Plan, Subsequent Update and Audit Due Dates.............................................7 Figure 4 - City Vicinity Map and Service Area.............................................................................................................10 Figure 5 - Organization Chart......................................................................................................................................20 Figure 6 - Chain of Communication Flowchart for Responding to and Reporting SSSs..............................................25
LIST OF TABLES
Table 1 - Abbreviations and Acronyms.........................................................................................................................5 Table 2 - City sewer connection flow classifications and connections data...............................................................11 Table 3 - Implementation Responsibilities .................................................................................................................18 Table 4 - Responsible Position Contact Information ..................................................................................................19 Table 5 - Spill Communication Contact Numbers.......................................................................................................24 Table 6 - High-Frequency Cleaning Pipelines..............................................................................................................39 Table 7 - Wastewater Collection System Lift Station Summary .................................................................................42 Table 8 - Summary of Capital Improvement Program Projects: Current Wastewater Projects.................................60
OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 1 of 69 Introduction
This Sewer System Management Plan (SSMP) or “Plan” has been prepared for the City with technical assistance from Fischer Compliance LLC with the goal of meeting and exceeding compliance with the State Water Resources Control Board 2022 General Waste Discharge Requirements, Order No. WQ 2022-0103-DWQ for Sanitary Sewer Systems (referred to throughout this document as the WDR). The City provided all details, information and institutional insights for preparation of the SSMP. The document has been developed to meet the size, scale, and complexity of the City, serving as a “living document” used as a tool for managing and operating the City's sanitary sewer collection system. Additionally, the latest 2024 Sewer System Management Plan Guidance Manual published by the Bay Area Clean Water Agencies (BACWA) was utilized as a model for development of the document to harmonize formatting/content and incorporate recommended suggested guidance wherever possible.
The City’s commitment to meeting or exceeding regulatory requirements, along with its proactive approach to operation and management of the collection system, has served it well, as evidenced by the system’s performance relative to other agencies in the region and the state.
This SSMP includes information for both the City of Yuba City and Stonegate Village. Prior to 2004, the Stonegate Village collection system and wastewater treatment facility were owned and operated by Yuba County. However, on March 23, 2004, the County adopted Resolution No. 04-01 “Resolution of the Tierra Buena Community Services District consenting to the reorganization of the Tierra Buena Community Services District as a Subsidiary District of the City of Yuba City”. The City subsequently connected the Stonegate Village collection system to the City’s collection system and the Stonegate Village wastewater treatment and disposal facility was abandoned. Because the City has incorporated Stonegate Village into its collection system, it is appropriate to prepare one SSMP for both systems. Unless described separately herein, all descriptions of the City’s collection system, maintenance, design, capacity evaluation, etc. includes Stonegate Village.
Because Stonegate Village was historically a separate collection and disposal system, it has its own WDID, separate from Yuba City. Even though the City has assumed full responsibility for the last 20 years, the City is still required to submit a separate SSMP, separate Annual Reports, and separate audits for Stonegate Village. The City would prefer that State Water Board staff update CIWQS to remove Stonegate Village as a separate system and to include it as part of the Yuba City collection system.
Figure 1 provides key spill metrics, including data comparing Stonegate Village’s spill record with state and regional system data, while Figure 2 provides the same key metrics for the City. The City consistently performs better than both statewide and regional spill rate indices and net spill volumes for all categories of spills from its sanitary sewer collection system.
OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 2 of 69 Figure 1 - Collection Spill Summary: Operational Indices for Stonegate Village CS with State and Regional Data
OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 3 of 69 Figure 2 - Collection Spill Summary: Operational Indices for Yuba City CS with State and Regional Data
OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 4 of 69 SSMP Organization
This SSMP is organized into 11 core elements following Attachment D of the WDR, with inclusion of applicable Specifications requirements.
Each individual element in the SSMP includes the following technical contents.
1. Requirements – Provides the actual description of applicable requirements in the WDR.
2. Compliance – Describes the City’s approach to complying with the WDR requirements.
3. Effectiveness – As measured by Key Performance Indicators (KPIs.)
4. Implementation – Demonstrates how the City will ensure the SSMP will be carried out as described.
5. Resilience – Demonstrates the resilience that is addressed in the SSMP and built-in to the City’s collection system and procedures.
6. Appendix Inclusions – List the items included in the Appendix for each SSMP Element, if any.
OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 5 of 69 Abbreviations and Acronyms
BMP Best Management Practices
CCTV Closed Circuit Television
CIP Capital Improvement Program
CIPP Cured in Place Pipe
CIWQS California Integrated Water Quality System (State Water Board Online Spill Database) CMMS Computerized Maintenance Management System
EPA US Environmental Protection Agency
FOG Fats, Oils and Grease
FSE Food Service Establishment
GCD Grease Control Device
GIS Geographic Information System
I & I Inflow and Infiltration
LRO Legally Responsible Official
RWQCB Regional Water Quality Control Board
SCADA Supervisory Control and Data Acquisition
SERP Spill Emergency Response Plan
SOP Standard Operating Procedure
SSMP Sewer System Management Plan
Spill Sanitary Sewer Spill
WDR Sanitary Sewer Systems General Wastewater Discharge Requirements Order issued by the State Water Board (Order No. 2022-0103-DWQ)
SWRCB State Water Resources Control Board
WDID Waste Discharge ID Number (CIWQS)
Table 1 - Abbreviations and Acronyms
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 6 of 69
1. Goal and Introduction
WDR REQUIREMENTS
Att. D-1 (pg. D-2)
“The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and mitigate spills that do occur.
The Plan must include a narrative Introduction section that discusses the following items:”
1.1. Regulatory Context
WDR REQUIREMENTS
Att. D-1.1 (pg. D-2)
“The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates”.
COMPLIANCE
The City is committed to fully implementing the WDR which includes addressing all requirements by integrating a wide range of programs specifically designed for ensuring the integrity and efficiency of the City’s sanitary sewer collection system. Moreover, the City is dedicated to maintaining its collection system in a systematic manner by implementing various work programs, with a focus on critical areas, to prevent spills, allowing for a comprehensive approach to maintenance. Work programs include CCTV inspections, pipe cleaning, manhole inspections, lift station maintenance, root control, source control and pipe repair, just to name a few. Work programs are described in more detail in Specifications 5.19 – Operation and Maintenance of this SSMP.
By prioritizing proactive measures and taking a comprehensive approach, the City is well-equipped with a proven track record of effectively operating its sanitary sewer collection system with the highest levels of service, complying with the WDR, and reducing/eliminating sewage spills.
EFFECTIVENESS
N/A
IMPLEMENTATION PLAN/SCHEDULE
N/A
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 7 of 69
1.2. SSMP Update Schedule
WDR REQUIREMENTS
Att. D-1.2 (pg. D-3)
“The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.”
COMPLIANCE
The City utilizes the State Water Board’s online lookup tool to ensure compliance with all required due dates for updating its SSMP and completing its required SSMP Audits (see chart below). The City’s most recent SSMP audit was completed for the period August 2021 through August 2024.
Milestones for incorporation of activities include a 3-year gravity main cleaning cycle, 3-month highfrequency cleaning cycles, a 5-year CCTV inspection cycle, 3miles per year of targeted chemical root control, and weekly lift station inspections.
The SSMP update for Stonegate Village is due August 2, 2026, and the next Stonegate Village SSMP audit is due August 2, 2025. However, as described in the Introduction section, the City would prefer that State Water Board staff update CIWQS to remove Stonegate Village as a separate system and to it include as part of the Yuba City collection system. In that case, there would be no need to submit a separate SSMP, annual reports, or audits for Stonegate Village.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Are SSMP Audits and SSMP Updates being performed as scheduled? • Has the SSMP been approved by the governing board on the required schedule (i.e., every six years)? • Are specific internally established sewer program milestones being monitored? Figure 3 - Sewer System Management Plan, Subsequent Update and Audit Due Dates
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 8 of 69
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW Maint
Supt Eng Collex Super Env Comp
1.2.1 Prepare for next SSMP
Audit Begin 2/2/2027 X X X X
1.2.2 Complete and Upload
next SSMP Audit By 8/2/2027 X X X
1.2.3 Incorporate Audit
Findings, update
Change Log and Update
SSMP
Begin after
completion of SSMP
Audit
X
1.2.4 Prepare for next SSMP
Audit Begin 2/2/2030 X X X X
1.2.5 Complete and Upload
next SSMP Audit By 8/2/2030 X X
1.2.6 Incorporate Audit
Findings, update
Change Log and Update
SSMP
Begin after
completion of SSMP
Audit
X X
1.2.7 Prepare for next SSMP
Update
Begin 2/2/2031
Complete by
6/15/2031 Council
Approval first
meeting in July 2031
X X X X
1.2.8 Water Board approval
deadline for next SSMP
Update*
By 8/2/2031 X X X
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 9 of 69
1.3. Sewer System Asset Overview
WDR REQUIREMENTS
Att. D-1.3 (pg. D-3)
“The Plan Introduction section must provide a description of the Enrollee-owned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons; • Structures diverting stormwater to the sewer system;
• Data management systems;
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percentage of residential, commercial, and industrial service connections; and
• Unique service boundary conditions and challenge(s).
Additionally, the Plan Introduction section must provide reference to the Enrollee’s up-to-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of this Attachment.”
COMPLIANCE
The City of Yuba City is in Sutter County and encompasses approximately 15 square miles. The existing wastewater collection system service area is approximately 7.1 square miles and includes a portion of the area within the City limits and a small area outside the City limits near Hillcrest, as shown on Figure 1.2, below. Figure 1.2 includes the Bogue Stewart area (in yellow) which is slated for future development and will be served by the collection system. Figure 1.2 also depicts the Stonegate Village collection system, at the northwest side of the City limits, with the purple force mains.
The City provides wastewater services to approximately 42,102 people (based on 14,034 residential connections and three people per connection). Most residential connections are low-density, single-family housing and much of the commercial development is retail related. There are also several minor industrial dischargers and one large industrial discharger, which generates food-processing waste. The percentage of residential, commercial, and industrial connections are shown in Table 1-1, below.
The City’s wastewater collection system includes approximately 175 miles of gravity mains ranging in pipe diameter from 4-inch to 42-inch diameter, of which approximately 70 percent are 6-inch and 8-inch diameter lines. The City also maintain 2 miles of force mains. Approximately 67 percent of the system has an installation year of 1990 or later, with 11 percent having an installation year before 1990, and the remaining 22 percent of unknown installation year. Approximately 82 percent of the system by pipeline length is composed of vitrified clay pipe. Appendix 1 contains tables detailing (a) gravity mains by diameter, (b) gravity mains by material, and (c) approximate age of the gravity mains.
In 2021, the City relined approximately 2,590 linear feet of 42-inch Techite pipe trunk line from Lincoln Road and the Garden Highway to the WWTF. The 2020 Wastewater Master Plan recommended the removal or rehabilitation of 9,420 feet of Techite reinforced plastic mortar pipe in the City’s wastewater collection system due to its high failure rate.
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 10 of 69 The City owns, operates, and maintains 17 lift stations. The system also includes approximately 3.3 miles of force mains, some of which are associated with the lift stations, and some of which are associated with private septic tank effluent pumping (STEP) systems in the Stonegate neighborhood. The City maintains the STEP systems in Stonegate. The City’s force mains range in diameter from 2-inch to 24-inch and are composed of various pipe materials.
The City does not have any siphons. The City has 6 stormwater stations with pumping capacity.
The City manages its collection system data using the iWorQ software which is geared toward community development and public works departments. This web-based software allows City staff to access data from a tablet or smart phone while in the field. The City’s geographical information system (GIS) maps are integrated into iWorQ.
The City estimates that there are 15,451 upper and lower service laterals connected to the system. Private entities own and operate all these laterals.
Figure 4 - City Vicinity Map and Service Area
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 11 of 69 Use Type Number or % of Connections
Residential 14,034
Commercial 1,210
Industrial/Institutional 6
Overall, the City is in a good position to maintain its collection system. There is one unique situation: the Stonegate Village collection system.
Stonegate Village
Stonegate Village is a residential subdivision that was outside of the City limits during development, and therefore the collection system and small wastewater treatment plant were owned and operated by Sutter County. However, in 2004, the City assumed responsibility for Stonegate Village from Sutter County. The wastewater treatment plant was decommissioned, and the collection system was connected to the City.
Stonegate Village is a residential subdivision with 108 homes, 14 mobile homes, and one elderly care home.
Each home in the subdivision collects its wastewater in an on-site 1,000-gallon reinforced concrete septic tank. The effluent from each septic tank is pumped into a pressurized collection pipeline, which transports the effluent to the City’s gravity main linked to the City’s Wastewater Treatment Facility. The City owns and operates the 105 service laterals in the system and the City’s crews conduct routine maintenance and replace the critical components at each of the 112 services a minimum of once every two years. The City would like to eventually install gravity sewer lines to replace the septic tank pumps system infrastructure.
System maps, include gravity mains, manholes, lift stations, other collection system features are available to all staff through the iWorQ database. The City continues to make efforts to accurately represent lateral information. Refer to Section 4.1- Updated Map of Sanitary Sewer System for more detail.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Are asset statistics periodically reviewed and updated as necessary? • Are omissions or errors addressed in a timely manner? • Are developments being added to the GIS maps each year? Are system maps up to date? Table 2 - City sewer connection flow classifications and connections data
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 12 of 69
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW Maint
Supt Eng Collex Super
Env
Comp
1.3.1 Review City-owned asset
statistics and element
description; update as
necessary
At the beginning of the
audit cycle and when
significant changes have
been made.
X X X
1.3.2 Update Maps Annual effort to reduce
backlog and bring mapping
up to date.
X
1.3.3 Use calendar reminders to
ensure compliance
deadlines are met
Second half 2025
X X X
RESILIENCE
Resilience is addressed in Element 1 by:
• Adhering to an SOP for collecting and managing asset data. • Redundancy: More than one member of staff is trained and able to retrieve and manage the data. • Implementing a QA/QC process to help ensure information is accurate. • Using Calendar Reminders to ensure compliance deadlines are met.
APPENDIX 1 INCLUSIONS:
• 1.1 Gravity Main Details
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 13 of 69 Specifications 5.2 – SSMP Development and Implementation
WDR REQUIREMENTS
Specification. 5.2 (pg. 18)
“To facilitate adequate local funding and management of its sanitary sewer system(s), the Enrollee shall develop and implement an updated Sewer System Management Plan. The scale and complexity of the Sewer System Management Plan, and specific elements of the Plan, must match the size, scale, and complexity of the Enrollee’s sanitary sewer system(s). The Sewer System Management Plan must address, at minimum, the required Plan elements in Attachment D (Sewer System Management Plan – Required Elements) of this General Order. To be effective, the Sewer System Management Plan must include procedures for the management, operation, and maintenance of the sanitary sewer system(s).
The procedures must: (1) incorporate the prioritization of system repairs and maintenance to proactively prevent spills, and (2) address the implementation of current standard industry practices through available equipment, technologies, and strategies.”
COMPLIANCE
The City's current Sewer System Management Plan (SSMP) has been updated to meet the requirements of Order WQ 2022-0103-DWQ and addresses the required Elements. The SSMP addresses management, operations and maintenance procedures specific to the City’s collection system. The City maintains a proactive O&M program to operate its system and identify defects, which are then prioritized for repair, replacement, rehabilitation, or placed on modified maintenance schedules. (See Elements 4 and 8 and Specifications 5.19 of this SSMP for more detail.)
The City keeps up with current industry standards, technology and best practices by reviewing industry periodicals, networking and attending industry conferences and workshops. The City continuously evaluates emerging practices, equipment and technologies for possible implementation to enhance sewer operations.
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 14 of 69 Specifications 5.7 – Allocation of Resources
WDR REQUIREMENTS
Specification. 5.7 (pg. 22)
“The Enrollee shall comply with the following requirements:
• Establish and maintain a means to manage all necessary revenues and expenditures related to the sanitary sewer system; and
• Allocate the necessary resources to its sewer system management program for:
• Compliance with this General Order,
• Full implementation of its updated Sewer System Management Plan, • System operation, maintenance, and repair, and
• spill responses.”
COMPLIANCE
The City maintains various revenue sources to maintain financial stability, meet its operational needs and manage all necessary expenditures for its sewer system operation. The primary source of revenue is the annual Sewer Service Rate Charge, which is collected from customers and used for:
a. The City’s operation and maintenance of the Yuba City Wastewater Facility b. Maintenance and operation of City wastewater collection and conveyance system c. General administrative services
The City is considering a Proposition 218 water and wastewater rate increase election for the fall of 2025.
The City Development Services Department collects a Connection Fee that funds the installation of facilities to areas not yet served and to upsize pipes to ensure adequate capacity.
While the City is generally adequately staffed and owns and operates the necessary equipment to effectively maintain its collection system, the 2020 Wastewater Master Plan contains a list of improvements recommended for near-term development and at buildout. Information regarding the City’s current wastewater utility rates is found at Wastewater Utility Rates.
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 15 of 69 Provisions 6.1 - Enforcement Provisions
WDR REQUIREMENTS
Provisions 6.1 (pg. 27)
“The following enforcement provisions are based on existing federal and state regulations, laws and policies, including the federal Clean Water Act, the state Water Code and the State Water Board Enforcement Policy.”
COMPLIANCE
The City is aware of the consequences for noncompliance including associated penalties for violations. The City maintains a proactive stance with full implementation of its SSMP.
Noncompliance with requirements of this General Order or discharging sewage without enrolling in this General Order constitutes a violation of the Water Code and a potential violation of the Clean Water Act and is grounds for an enforcement action by the State Water Board or the applicable Regional Water Board.
Failure to comply with the notification, monitoring, inspection, entry, reporting, and recordkeeping requirements may subject the City to administrative civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement. Discharging waste not in compliance with the requirements of this General Order or the Clean Water Act may subject the City to administrative civil liabilities up to $10,000 a day per violation and additional liability up to $10 per gallon of discharge not cleaned up after the first 1,000 gallons of discharge; up to $5,000 a day per violation pursuant to Water Code section 13350 or up to $20 per gallon of waste discharged; or referral to the Attorney General for judicial civil enforcement.
GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 16 of 69 Provisions 6.3 Sewer System Management Plan Availability
WDR REQUIREMENTS
Provisions 6.3 (pg. 31)
“The Enrollee’s updated Sewer System Management Plan must be maintained for public inspection at the Enrollee’s offices and facilities and must be available to the public through CIWQS and/or on the Enrollee’s website, in accordance with section 3.8 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.”
COMPLIANCE
The City publishes its SSMP, available for public review, on its website at the Wastewater Planning Page and also maintains a paper copy in its offices which can be made available for inspection during regular business hours.
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 17 of 69
2. Organization
WDR REQUIREMENTS
Att. D-2 (pg. D-3)
“The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of this General Order;
• The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan Element;
• Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county health officer, county environmental health agency, and State Office of emergency Services.)
COMPLIANCE
The above items are addressed in the order below:
The City’s Legally Responsible Official is Tim Bybee, the Public Works Maintenance Supervisor. The City intends to add Phil Marler, the Deputy Public Works Director-Utilities as a second LRO. Both people meet the requirements set forth in Specifications 5.1 of the WDR.
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 18 of 69
IMPLEMENTATION RESPONSIBILITIES
Sewer System Management Plan Elements Responsible Position
1. SSMP Plan, Goal and Introduction
1.1. Regulatory Context Environmental Compliance Manager
1.2. SSMP Update Schedule Environmental Compliance Manager
1.3. Sewer System Asset Overview Engineering
2. Organization PW Maintenance Superintendent
3. Legal Authority PW Maintenance Superintendent
4. Operations and Maintenance Program
4.1. Updated maps of Sanitary Sewer System Engineering
4.2. Preventive Operation & Maintenance Wastewater Collections Supervisor
4.3. Training PW Maintenance Superintendent, Wastewater Collections Supervisor
4.4. Equipment Inventory Wastewater Collections Supervisor
5. Design/Performance
5.1. Updated Design Criteria & Construction
Standards Engineering
5.2. Procedures and Standards Engineering
6. Spill Emergency Response Plan PW Maintenance Superintendent, Environmental Compliance Manager, Wastewater Collections Supervisor
7. Sewer Pipe Blockage Program PW Maintenance Superintendent, Environmental Compliance Manager, Wastewater Collections Supervisor
8. System Eval, Capacity Assurance, Capital Imp. Engineering
8.1. System Evaluation and Condition
Assessment Engineering
8.2. Capacity Assessment and Design Criteria Engineering
8.3. Prioritization of Corrective Action Engineering
8.4. Capital Improvement Plan Engineering
9. Monitoring, Measurement & Program
Modifications
PW Maintenance Superintendent, Environmental Compliance Manager, Wastewater Collections Supervisor, Engineering
10. Internal Audits Engineering, Wastewater Collections Supervisor, Environmental Compliance Manager
11. Communication Program PW Maintenance Superintendent Table 3 - Implementation Responsibilities
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 19 of 69 Responsible Position Contact Information
Responsible Position Responsible
Person Phone Email
PW Maintenance Superintendent/
Legally Responsible Official Tim Bybee (530) 822-3241 [email protected] Wastewater Collections
Supervisor/CIWQS Data Submitter Eduardo Ramirez (530) 822-4834 [email protected] Environmental Compliance
Manager/CIWQS Data Submitter Katherine Willis (530) 822-7572 [email protected] Interim City Manager Robert Bendorf (530) 822-4792 [email protected] Deputy Public Works DirectorEngineering Kevin Bradford (530) 822-4632 [email protected] Deputy Public Works Director –
Utilities/Legally Responsible Official (LRO
application pending)
Phil Marler (530) 822-3264 [email protected]
Table 4 - Responsible Position Contact Information
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 20 of 69
2.1. Organizational Chart
Figure 5 - Organization Chart
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 21 of 69
2.2. Organizational Staffing Responsibilities
The City’s organizational lines of authority and staffing are as follows:
City Council: Funds City Budget and approves SSMP and major changes.
City Attorney: Interprets and enforces Municipal Code.
City Manager: Manages all City departments.
Public Works and Development Services Director:
• Legally Responsible Official for ensuring the City complies with the 2023 Sewer System Management Plan.
• Directs, plans, organizes, and supervises the public works activities of the City. • Advises the City Manager and City Council on engineering and public works matters including those involving collection system improvements, maintenance, and operation. • Prepares and controls department budget.
Public Works Maintenance Superintendent:
• Plans, organizes, and supervises the maintenance, operations, and repair of public works infrastructure, including the sanitary sewer collection system. • Controls budget expenditures within the Sewer Collections Division.
Deputy Public Works Director - Utilities:
• Plans, organizes, and supervises the maintenance, operations and repair of Water and Wastewater Treatment Facilities.
• Controls budget expenditure within the Utilities division.
Maintenance Administrative Clerk:
• Assists with data entry and report development using the City's maintenance management system. • Keeps track of training requirements and employee training histories.
Wastewater Collections Supervisor:
• Recommends and assists in the implementation of goals and objectives. • Oversees the daily activities of sewer collections crews. • Prepares various reports on operations and activities, including reporting sanitary sewer spills and other regulated issues.
• Recommends improvements and modifications.
• Supervises work in areas such as installation, repair, and cleaning of the wastewater collection system. • Trains crew members in specific tasks, as needed, including collection system preventive maintenance and SSS response.
• Ensures the collection system is being maintained in accordance with the City's SSMP.
Wastewater Collections Maintenance Worker I/II/III:
• Cleans sewer pipelines, conducts preventative maintenance, and repairs collection system sewer mains. Conduct Closed Circuit Television (CCTV) inspections. • Enters data regarding work completed into the City's maintenance management system.
Electrical and Instrumentation Technicians, Maintenance Mechanics and Workers:
• Maintains the lift stations.
• Responds to lift station failures and lift station spills.
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 22 of 69 Wastewater Treatment Facility (WWTF) Supervisor:
• Manages WWTF operations under the direction of the Deputy Public Works Director - Utilities. • Coordinates with the other team members for the planning, design and construction of facilities identified by the Wastewater Master Plan.
• Controls budget expenditures within the maintenance and operations of the WWTF and sanitary sewer lift stations.
WWTF Plant Maintenance Supervisor:
• Manages day-to-day operation of the plant maintenance mechanics. • Schedules work assignments associated with lift station maintenance and repairs. • Estimates needed equipment and equipment maintenance.
WWTF Plant Maintenance Mechanics:
• Repairs and replaces lift station pumps and valves.
• Conducts preventive maintenance at lift stations. Respond to lift station emergency calls.
Environmental Compliance Manager:
• Monitors legislative process and regulatory rulemaking to prepare for future regulatory compliance and reporting requirements.
• Assists in the development of procedures, documents, and practices to facilitate regulatory compliance.
• Develops recommendations for capital expenditures and long-term planning to improve the resiliency of the City's operations and maintenance of the collections system. • Supervises the Wastewater Pretreatment and the FOG program.
Environmental Compliance Coordinator:
• Responsible for the Pretreatment and FOG Control Program.
Environmental Compliance Inspector:
• Responsible for inspecting Food Service Establishments and other facilities with grease interceptors. • Works with business owners and operators to ensure compliance with City regulations regarding FOG handling.
WWTF Operators:
• Monitors daily operation of lift stations using System Control and Data Acquisition (SCADA). • Responds to lift station alarms, SmartCover alarms, and other lift station operational issues.
Lab Supervisor:
• Manages Laboratory and laboratory staff.
Deputy Public Works Director - Engineering:
• Works under the policy guidance and direction of the Public Works Director. • Assists the Public Works Director in development of department plans and programs, including the Capital Improvement Program (CIP).
• Maintains and updates the Design and Construction Standards. • Develops and implements the Capital Improvement Program Updates of the Wastewater Master Plan.
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 23 of 69 Senior/Associate/Assistant Civil Engineer:
• Acts as project engineer/manager on wastewater infrastructure projects. • Prepares and/or coordinates with engineering consultants to prepare plans, specifications, and preliminary cost estimates.
• Coordinates with other sanitary sewer management team members on wastewater infrastructure issues.
• Confers with contractors and consultants on engineering and construction matters. • Prepares reports on wastewater infrastructure projects.
Engineering Technician GIS:
• Produces maps with sewer lines, manhole locations, and pumping facilities as needed by the collections management and crews.
Construction Inspector:
• Reviews plans and specifications for proposed construction projects. • Inspects sewer line installations along with associated facilities to ensure construction is in conformance with approved plans and specifications.
WWTF Chief Operator:
• Oversees the WWTF operational staff.
• Ensures plant operators effectively monitor lift station operations and respond as needed to Lift Station and SmartCover alarms.
WWTF Operators:
• Responsible for daily monitoring of lift stations using SCADA. • Respond to lift station alarms, SmartCover alarms, and other lift station operational issues.
Data Submitter:
• The Wastewater Collections Supervisor is authorized to certify electronic spill reports reported to the SWRCB through the California Integrated Water Quality System (CIWQS).
Data Submitter:
• The Environmental Compliance Manager is authorized to certify electronic spill reports submitted to CIWQS.
Legally Responsible Official:
• The Public Works Maintenance Superintendent is LRO regarding implementation and maintaining this SSMP.
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 24 of 69
2.3. Chain of Communication for Reporting Spills
TheWastewaterCollections Supervisor and the Public Works Maintenance Superintendent are the lead response coordinators in the event of a spill. The table below lists contact phone numbers for the partiesincluded inthe chain of communication. The figure below shows a flowchart depicting the chain of communication for responding to and reporting spills, starting with observation of a spill through reporting the spill to the appropriate regulatory agencies.
Contact Telephone Number
Public Works Department (530) 822-4626
Police Department Dispatch Center (530) 822-4660
Wastewater Collections Supervisor (530) 822-4834
Public Works Maintenance Superintendent (530) 822-3241
WWTF Supervisor (530) 822-3264
WWTF Operations Center (530) 822-3264
WWTF Ops 1 (24-hr mobile) (530) 713-8732
Table 5 - Spill Communication Contact Numbers
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 25 of 69 Figure 6 - Chain of Communication Flowchart for Responding to and Reporting SSSs
ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 26 of 69
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Have there been any changes requiring updates to the Organizational Chart? • Have there been instances when a service call for a spill was not properly routed to response personnel?
• Were all spill response activities documented and forwarded to the LRO? • Have there been any changes in assigned responsibilities for implementing the SSMP? • Is there a process in place to ensure all contact information remains up to date?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
2.1 Review names, contact information and
position responsibilities. Update as
necessary.
Semi-Annually
X X
2.2 Review Chain of Communication
outcomes for all spill responses
Each Spill Event
X X
2.3 Review Organizational Chart for any
changes. Update as necessary.
Semi-Annually
X X
2.4 Add second LRO Second half 2025
X
RESILIENCE
Resilience is addressed in Element 2 by:
• Ensuring that more than one person is capable and responsible for specific duties for SSMP implementation, e.g., back-up personnel.
• Designation of more than one LRO to help ensure full and continuous coverage of duties. • Testing the phone notification system to ensure calls are received and routed to appropriate personnel.
APPENDIX 2 INCLUSIONS:
• None
LEGAL AUTHORITY
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 27 of 69
3. Legal Authority
WDR REQUIREMENTS
Att. D-3 (pg. D-4)
“The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages; • Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure; • Require that sewer system components and connections be properly designed and constructed;
• Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and
• Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.
COMPLIANCE
The above items are addressed in order below:
a. Authority to prevent illicit discharges into the City’s wastewater collection system.
Title 6, Chapter 5, Article 2 of the City’s Ordinance Code regulates the disposal of sanitary sewage into the City’s sanitary sewer system to protect the proper functioning of the collection system as well as the treatment plant. Chapter 5 includes, but is not limited to the following key provisions:
• §6-5.208: General and specific prohibited discharge standards (includes, but is not limited to, prohibitions for storm water, obstructing or injurious substances, flammable or explosive substances, hot substances, FOG, solid or viscous matter, corrosive matter, toxic gases, vapors, or fumes, interfering substances, prohibition on use of diluting waters, suspended solids; dissolved matter, noxious or malodorous matter, radioactive matter, colored matter, garbage, and non-flushable wipes).
• §6-5.209: Pretreatment local limits.
b. The City’s pre-planned collaboration and coordination with storm drain agencies.
The City owns and operates most of the storm drains within its boundaries and has a de facto legal authority to ensure access to these storm drains in the event of a wastewater spill. In addition, both Sutter County and Caltrans own and operate some storm drains and/or storm water retention basins within the City. The City will coordinate with Caltrans and Sutter County to prepare mutual aid agreements to allow the City to respond to any wastewater spills which enter a Caltrans or Sutter County storm drain or retention basin. The City does not currently possess a reliable mapping system for storm drains.
LEGAL AUTHORITY
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 28 of 69 c. Require that sewer system components and connections be properly designed and constructed.
Title 6, Chapter 5, Article 3, Section 6-5.301(b) of the City’s Ordinance Code states that “the design and construction of building sewers and service laterals, including the connections, shall be in accordance with the requirements of the City, latest edition of the International Building Code and California Plumbing Code, and in accordance with the City's standard specifications.” Article 3 includes provisions related to testing, maintenance and repair, requirements for plans, specifications, persons authorized to perform work, and design standards for sanitary sewers, construction inspections.
The City’s standard specifications are found on the City’s website on the Engineering’s Technical Documents page.
d. Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee.
Title 6, Chapter 5, Article 2, Section 6-5.206 of the City’s Ordinance Code states that all service laterals are installed, properly maintained, and repaired by the owner of the property that the lateral serves.
However, Title 6, Chapter 5, Article 3, Section 6-5.301(h) states, in part, “The City shall have the right to conduct maintenance inspection, and/or repair to the service lateral if needed, and it shall be the property owner's obligation to reimburse the City for the actual cost of such repair and inspection.” e. Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures.
The authority to enforce the sewer ordinance is found in Chapter 5, Article 1 of the City’s Ordinance Code. Section 6-5.103 describes the City Manager’s authority to coordinate enforcement actions of the Public Works Director, the Finance Director, and any other necessary department. Primary enforcement authority is assigned to the Public Works Director. The overall enforcement policy and penalty provisions for violations of the City’s Ordinance Code is found in Chapter 2. f. Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.
Title 6, Chapter 5, Article 2, Section 6-5.223 of the City’s Ordinance Code, states “The City shall have the right to operate, inspect, maintain, and repair sewer system assets located within the sewer easements.” Title 6, Chapter 5, Article 3, Section 6-5.302(e) states that “in the event an easement is required for the extension of the public sewer or the making of connections, the applicant shall procure and have accepted by the City a proper easement or grant of right-of-way having a minimum width sufficient by law to allow the laying and maintenance of such extension or connection.” Some manholes are in backyards in the older part of town; however, the City has easements allowing for access. The City has exposed about 85% of these areas and has completed CCTV inspections. The City maintains a binder containing information for each backyard where work has been performed (i.e., manhole brought to grade, cleaned). The City will continue this work for the remainder of the backyard manholes.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Are the City ordinances and standards adequate for fulfilling the SSMP legal requirements? • Does the City have a process in place for periodic review and evaluation of ordinances? • Have there been instances when the code or ordinance did not address a need or circumstance?
LEGAL AUTHORITY
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 29 of 69
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW Maint
Supt Eng Collex Super Env Comp
3.1 Review Ordinance(s) to
confirm all documents
provide necessary required
legal authority.
Once per 6-year
SSMP Update
Cycle X X X X
3.2 Confer with storm drain
owners to ensure current
practices and contact
information are up to date.
Annually
X
3.3 Monitor and document
occasions when
Ordinance(s) failed to
address issues as intended.
Continuously
X X X
3.4 Coordinate with Caltrans
and Sutter County to
prepare mutual aid
agreements to allow the
City to respond to any
wastewater spills which
enter a Caltrans or Sutter
County storm drain or
retention basin.
By 7/1/2026
X X X
3.5 Review and update storm
drain maps.
Beginning 2/1/26 X X X
RESILIENCE
Resilience is addressed in Element 3 by:
• Keeping abreast of industry trends and local ordinances that may affect operations.
APPENDIX 3 INCLUSIONS:
• None
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 30 of 69
4. Operation and Maintenance Program
WDR REQUIREMENTS
Att. D-4 (pg. D-4)
“The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.”
4.1. Updated Map of Sewer System
WDR REQUIREMENTS
Att. D-4.1 (pg. D-4)
“An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.”
COMPLIANCE
The City GIS system and associated databases, including iWorQ, show locations and list attributes of gravity pipelines, maintenance structures (manholes), pressure lines and valves, pumping facilities, and applicable stormwater conveyance systems.
The mapping system includes a sanitary sewer collection system grid map for preventative maintenance activities. There are a total of 144 grids covering the entire sewer collection system. Gilsizer Slough and Live Oak Canal, which are located close to major collection trunk lines, are also shown on the GIS maps.
The mapping system allows City staff to locate the collection system components and relevant features electronically (e.g., city streets, highways, critical structures, local waterways, city limits, addresses, and property tax roll data).
The GIS maps are available to the sewer maintenance field staff at the Corporation Yard electronically. The GIS data and maps are also accessible on the computers used for the high-pressure hydraulic jet cleaning and combination vacuum trucks and the CCTV truck. The maps serve as an aid to engineers in planning improvements and for the maintenance crews in locating various items in the field.
The last comprehensive update to the GIS maps was completed in approximately 2009. The City's Information Technology Division maintains the City GIS system including sanitary sewer collection system maps. As-built elements of the collection system are periodically added to the GIS system. A consulting firm is currently updating some GIS layers as part of a long-term project to update the maps for the entire City’s wastewater, water, and stormwater systems. Sewer mains were moved out of backyards and replaced in the downtown area from 2012-2014. The as-built drawings from this project are anticipated to be incorporated into the City’s GIS system by the end of 2025.
City staff intend to implement a process to keep maps up to date, including (1) Contracting for professional services to update map layers for wastewater, water, and stormwater soon after as-built drawings are completed for new subdivisions and other developments, and 2) Developing staff capacity or contracting for professional services to correct maps when staff identifies errors or omissions.
Upon request, the City will provide State and Regional Water Board staff a link to system maps.
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 31 of 69
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Were map updates completed in a timely manner?
• Are all staff trained in the procedure for providing map update information? • Are newly installed sewer assets incorporated into the system maps? • Are there terrain features or assets that should be incorporated in future map updates (e.g. exposed pipe, siphons, ARVs, surface water, etc.)
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
4.1.1 Review map update procedures with all
affected staff.
Annually X X X X
4.1.2 Review/ensure all newly installed facilities
have been updated and included in the
system maps.
Annually
X X X
4.1.3 Implement process to updated maps after
new development or when staff finds
errors/omissions
Beginning second half
2025 X X X
4.1.4 Ensure maps are updated to reflect current
sewer system and includes storm drains.
2/1/27 X X X X
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 32 of 69
4.2. Preventive Operation and Maintenance Activities
WDR REQUIREMENTS
Att. D-4.2 (pgs. D-4/D-5)
”A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors. The scheduling system must include:
• Inspection and maintenance activities;
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.
The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure.”
COMPLIANCE
The purpose of a work order system is to program and track all required inspection and maintenance activities within the collection system to help proactively prevent blockages/operational problems or spills.
The City utilizes the iWorQ software which is geared toward community development and public works departments. This web-based software allows City staff to access data from a tablet or smart phone while in the field. The City’s GIS system is integrated into iWorQ.
The City’s software program maintains historical data for all maintenance activities and provides a basis for critical analysis and data-driven planning and decision-making today and into the future. This allows for prioritizing and planning routine activities such as CCTV inspections, pipe cleaning, and chemical root control.
The City does not use iWorQ to create work orders. Instead, City staff use the maps found within iWorQ to visually show when a section of the collection system was last cleaned or CCTV inspected. City staff start at the “top” of the collection system and clean/inspect their way to the “bottom”. After work is completed each day, staff document their work by entering the results in iWorQ. This changes the colors of the asset on the map and allows staff to visually see where to begin work the next day.
The City maintains a list of Hot Spots which are cleaned quarterly. This information is entered into iWorQ, as well as emergency and other reactive activities. Work orders for other activities are generated by supervisory personnel on an as-needed basis.
The City’s preventative maintenance work order tracking has improved significantly in the last few years by using facility identification numbers for work orders and by checking the consistency of documentation of preventative maintenance activities.
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 33 of 69
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Are the City’s maintenance, operations, engineering work orders periodically audited for accuracy and completeness?
• Does the City monitor “open,” “overdue,” or “not yet completed” work orders to ensure completion of tasks?
• Are inspection and maintenance activities reducing the number and volume of spills? • Is maintenance work being completed as scheduled?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng
Collex
Super
Env
Comp
4.2.1 Review work completed to date to ensure critical
work is being completed Quarterly X X
4.2.2 Review scheduled Preventative Maintenance to
ensure the prescribed schedule remains appropriate. Annually X
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 34 of 69
4.3. Training
WDR REQUIREMENTS
Att. D-4.3 (pg. D-5)
“In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:
• The requirements of this General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and practice drills; • Skilled estimation of spill volume for field operators; and • Electronic CIWQS reporting procedures for staff submitting data.”
COMPLIANCE
The City’s training program covers several areas associated with wastewater collection systems and serves to develop and maintain highly qualified, knowledgeable, and capable staff. This training is provided through a variety of modes and begins with the first day on the job and continues regularly thereafter.
Most of the on-the-job training and skill related training occurs when new employees work closely with more experienced staff to become familiar with the City facilities and their mechanical, electrical, and control systems.
Operational training occurs when the Wastewater Collections Supervisor directs the O&M activities for the sewer collection system (excluding lift stations) during normal and high-flow events and the WWTF Plant Maintenance Supervisor directs O&M activities for lift stations during normal and high-flow events. Current operational training for supervisors occurs through one-on-one mentoring at the supervisory level.
The City provides safety training to the O&M staff that meets California Occupational Health and Safety Administration (CalOSHA) personnel safety and awareness requirements (e.g., confined space entries, lockout/tagout, etc.) on a continuous basis. Training sessions for Health and Safety items are documented using a training matrix and records are maintained using a training software program. The Training materials are stored at the WWTF and at the Corporation Yard depending on the type of equipment/facility.
In addition, O&M staff receive training provided by equipment suppliers and vendors when new facilities are constructed.
However, training sessions that are more applicable to the collection system, such as implementing the Spill Emergency Response Plan (SERP) and CIWQS data submittal, have not been offered on a regular basis and have not been documented. Moving forward, the City is committed to investing in a regular, documented training program. A sample training record is included in Appendix 4.
The City typically has the resources and staff available to operate and maintain the collection system and does not employ private contractors. However, the City uses private contractor’s help as needed for backup support in case of equipment failure. Contractors are always accompanied by trained City staff who are responsible for coordinating and directing the contractors during a spill event, and for following all appropriate procedures. The City does not allow private contractors to work on a spill without the presence of City staff. However, if contractors will work by themselves and therefore need training, the City will use the “Spill Response Requirements for Contracted Services” form found in Appendix 4.
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 35 of 69 Staff involved in responding to sewage spills have previously received training on the City’s SERP and the requirements of the WDR. However, because there have been very few spills City staff have not implemented their training. The City intends to offer more frequent training related to the SERP, including both classroom and hands-on exercises and drills. The training is intended to cover containment, restoring flow, estimating spill volume and volume recovered, spill start time estimations, clean up and completing the spill event data collection forms.
Staff designated as Data Submitters have been trained on the City’s procedures for reporting spills from receipt of call to draft report submittals and certification. Data Submitters and other City staff would benefit from additional spill response training.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Has all training been completed as scheduled?
• Have records of training and attendance been documented and maintained? • Have all staff demonstrated ability and knowledge after each training event? • Have contractors received, at a minimum, direction for reporting and responding to spills?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
4.3.1 Review training documentation to ensure all staff have received required training Quarterly X X
4.3.2 Review agreements with contractors and/or prejob meeting minutes to ensure contract personnel have received instruction for responding to sewage
spills
Each Contract X X X
4.3.3 Implement a consistent training program for SERP
and other collections-related activities and
document all trainings using the Appendix 4
Training Record or similar document.
Beginning in
2025
X X
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 36 of 69
4.4. Equipment Inventory
WDR REQUIREMENTS
Att. D-4.4 (pg. D-5)
“An inventory of sewer system equipment, including the identification of critical replacement and spare parts.”
COMPLIANCE
The City maintains a host of equipment for both routine maintenance and for contingency or emergency operations. The required sewer line repair parts (such as manhole covers, pipe repair parts etc.). are stored at the Corporation Yard and lift station parts (such as pumps, electrical parts, etc.) are stored at the WWTF.
The inventory of replacement parts is controlled by the assigned criticality of the part. The parts with high criticality have a higher stocking priority and inventory backlog to appropriately respond to an emergency.
Three lift stations, Lift Stations #1, #2, and #10, have permanent on-site generators. The onsite permanent generators supply power to these lift stations during a power outage. Two more permanent onsite generators have been purchased and installed for Lift Stations #3 and #14. Portable generators are stored at both the Corporation Yard and the WWTF to be available to provide temporary power at all other lift stations.
The City purchases replacement and spare parts in advance and tracks these items in its inventory. The Wastewater Collections Supervisor and WWTF Plant Maintenance Supervisor determine which parts need to be stored at their respective facilities. As these items are used, replacement parts are ordered. The following paragraphs describe where different major items like pumps and generators are located or stored.
It also discusses where replacement and repair parts are located and how inventories are maintained. An example inventory list for the sewer mains, Stonegate, spill response, and lift stations is found in Appendix
4. Corporation Yard: Sewer Mains and Stonegate System
Pipe and fittings for sewer line repairs and all replacement and repair parts associated with the Stonegate STEP systems are stored at the Corporation Yard. Sewer crews maintain sewer mains and respond to emergencies throughout the City as scheduled and as needed. At Stonegate, sewer crews replace the pumps, valves, bio baskets, and inspect the associated electrical and mechanical equipment for each home on a two-year rotation and respond to emergencies as needed. The Sewer System Supervisor tracks the inventory and ensures equipment and supplies are ordered as needed to maintain adequate inventories.
Spill Response Equipment
Most equipment needed for responding to Sanitary Sewer Spills is stored at the Corporation Yard.
Additional equipment is stored at the WWTF.
Lift Stations
Lift station equipment and parts are stored at the WWTF Maintenance shop and warehouse. At least one spare pump is on hand for emergency replacement of any Flygt pump in the 16 lift stations running on Flygt pumps. Rebuild kits are also kept on hand for these pumps. Normal practice is to rebuild or replace any pump immediately when a pump is taken out of service for repair. Rebuild kits are also ordered whenever a kit is used for a pump rebuild. Pump and parts inventories are updated and reported to Finance every year. The Maintenance Supervisor and Lead Mechanic are responsible for tracking inventory over the course of the year and making sure the spare pumps, rebuild kits, and various repair parts are replaced as needed.
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 37 of 69 Three new 35 HP Flygt pumps were installed at Lift Station #2 in January 2024.
Lift Station #10 has three 30 HP pumps installed and is never allowed to run more than two at any time.
There isn’t a 30 HP Flygt pump in storage for this lift station. If one pump needs to be taken out of service, normal practice is to run on the remaining two. A spare 10 HP pump is available for temporary operation if needed.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Have inventory lists been audited as scheduled?
• Have any inventory deficiencies or omissions been discovered and rectified? • Has the City experienced any equipment failure that inhibited a spill response?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
4.4.1 Audit inventory lists to ensure stock is
adequate Annually X
4.4.2 Check with vendors to ensure lead times for
critical parts are as expected. Annually X
4.4.3 Ensure contracts with emergency support
services are current. Annually X X
4.4.4 Document manhole inspections using a
standard form.
Beginning second half
2025
X
4.4.5 Develop Emergency Response Procedures
for each lift station.
Beginning second half
2025
X
RESILIENCE
Resilience is addressed in Element 4 by:
• Developing an SOP for updating maps when errors are discovered. • Developing and using forms (paper and/or electronic) for data collection to help ensure all pertinent information is consistently collected.
• Periodically evaluating inspection cycle intervals to help ensure they are optimized. • Requiring staff to demonstrate ability and/or knowledge for all training activities. • Monitoring equipment and critical spare parts usage for and trends. • Performing periodic audits of the vehicle and equipment inventory list.
APPENDIX 4 INCLUSIONS:
• 4.1 Training Record
• 4.2 Spill Response Requirements for Contracted Services • 4.3 Example Equipment Inventory
• 4.4 Example Manhole Inspection Form
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 38 of 69 Specifications 5.19 - Operations and Maintenance
WDR REQUIREMENTS
Specification. 5.19 (pg. 27)
“To prevent discharges to the environment, the Enrollee shall maintain in good working order, and operate as designed, any facility or treatment and control system designed to contain sewage and convey it to a treatment plant.”
COMPLIANCE
The City’s sanitary sewer collection system consists of approximately 173 miles of gravity sewer lines ranging from 4 inches to 54 inches in diameter, approximately 3.3 miles of force-main ranging from 4 inches to 20 inches in diameter and 17 lift stations. Approximately 70 percent of the collection system gravity mains are 6-inch and 8-inch diameter lines. This has a direct impact on the sewer pipeline maintenance activities and the equipment needed to maintain the collection system.
Regular Maintenance and Cleaning
Routine preventive O&M activities are performed by a sewer maintenance staff consisting of five journey level (greater than two years of experience) people and one entry level person under the direction of the Wastewater Collections Supervisor. The major equipment for routine preventive O&M activities includes:
two combination jet-vacuum trucks, an easement jetter, one CCTV truck, a mini-excavator, and a dump trailer.
Pipeline cleaning of the sanitary sewer system is routinely accomplished on a grid basis. A grid is selected and cleaned by one of the sewer maintenance crews with the city-owned combination jet cleaning and vacuum truck. The work is documented using the iWorQ computerized maintenance management system (CMMS) sewer software.
The cleaning is performed from top to bottom of a grid, moving downstream from the upper reaches of the grid down to the collector sewers and trunk pipelines. Once a crew is assigned a grid, they continue working in the assigned grid until all the pipelines are cleaned. Progress slows down when the crews get into the older areas of the community which require much more work. The goal is to clean the whole collection system once every four years; the collections crew have been averaging between 2,500 and 5,500 linear feet per day for the past several years.
The CCTV crew follows behind the cleaning trucks, inspecting the pipelines that have been recently cleaned.
Thus, all the pipeline cleaning work is inspected. Through this approach, if the CCTV crew encounters a pipeline where additional cleaning is needed, the CCTV crew calls the cleaning crew and has them complete the pipeline cleaning before they move on. In cases where there may be a need for pipe repair or replacement, the CCTV footage is referred to the Engineering Division for further assessment.
Computer based software (GraniteNet/GNET) is utilized by the crews through laptop computers used by combination cleaning truck and through the onboard computer in the CCTV inspection truck. The videos from the CCTV truck computer are stored on a dedicated computer drive for record-keeping purposes and for evaluations of rehabilitation work.
All crew members are National Association of Sewer Service Companies (NASSCO) Pipeline Assessment Certification Program (PACP) trained and certified operators. The pipeline cleaning, inspection, and maintenance crews also serve as first responders to collection system blockages and/or spills.
The cleaning crews do not routinely document their inspection of manholes. However, the City intends to do so in the future, using a form such as the example “Manhole Inspection Form” found in Appendix 4.
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 39 of 69 High Frequency Cleaning
In addition to the routine preventative maintenance activities, higher frequency cleaning and inspection is scheduled for pre-selected pipelines where history has shown that grease or debris will cause sewer backups or spills unless these pipelines are cleaned more frequently. A list of these pipelines is shown in the table below. These pipelines are scheduled to be cleaned quarterly and inspected once every year. Most of the problems with these pipelines are believed to be related to sags or "flat bellies" that can be scheduled for repair or replacement in the relatively near term.
Num Suff Pipe ID Location Address Reason on List
1 C12167 Rickey Dr @ Railroad 1160 Rickey Dr Residential 2 04100 Forestwood Dr@ E Onstott Rd 1299 Forestwood Dr Apartments 3 05122 Peachtree Ln @ W Onstott Rd 1331 Peachtree Ln Residential 4 C9153 University Ave @ B St 807 B St
5 C9137 Park Ave @ B St 505 Park Ave
6 E11120 Richland Dr @ Walton Ave 633 Walton Ave Residential 7 A C7124 The Mall (Front & Back) 1215 Colusa Ave FSE
8 B D7138 The Mall (Front & Back) 1215 Colusa Ave FSE
9 C D7139 The Mall (Front & Back) 1215 Colusa Ave FSE
10 D D7140 The Mall (Front & Back) 1215 Colusa Ave FSE
11 E D6121 The Mall (Front & Back) 1215 Colusa Ave FSE
12 F D6123 The Mall (Front & Back) 1215 Colusa Ave FSE
13 A C4123 Gray Ave From Casita Dr to Melton Dr 1630 Gray Ave Residential & FSE 14 B C4137 Gray Ave From Casita Dr to Melton Dr 1630 Gray Ave Residential& FSE 15 C4174 Gray Ave From Kenny Drto Casita Dr 1579 Gray Ave Residential& FSE 16 A8111 B St@ Boyd St 311 B St FSE
17 A C5234 Gray Ave - Washington Ave to Charlotte Ave 1339 Gray Ave FSE 18 B C6156 Gray Ave - Washington Ave to Charlotte Ave 1339 Gray Ave FSE 19 A E4129 Stabler Dr,Nadean Dr to Coats Dr 1591 Nadean Dr Storm Drain Crowns 20 B E4194 Stabler Dr,Nadean Dr to Coats Dr 1591 Nadean Dr Storm Drain Crowns 21 89208 Rowe Ave @ Percy Ave 301 Percy Ave Apartments
22 C10106 Park Ave @ Orchard St 143 Orchard St Poor Pipe Connect 23 D8127 Joy @ Bridge St 1483 Bridge St Apartments
24 86160 Plumas St, Bird St to 1200 Palms Apts 1105 Plumas St Apartments 25 86159 Ainsley Ave to Bird St 401 Aimsley Ave Flat slope Table 6 - High-Frequency Cleaning Pipelines
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 40 of 69 Closed Circuit Television Inspection
The Sewer Collections team's goal is to conduct CCTV inspections of the entire system over a six-year period.
The City conducts its CCTV inspections using a truck outfitted with GraniteNet/GNET software. The system is NASSCO Pipeline Assessment Certification Program compliant. A pipe condition rating system is included with GraniteNet/GNET. The Engineering Division has a version of GraniteNet/GNET as well.
When the CCTV truck comes into the Corporation Yard at the end of the shift, the data is uploaded as the truck drives into its parking bay. The data is then transferred to the Engineering Division where the data is reviewed.
If a significant defect or possible sewer failure is found during an inspection, the crew will either contact the Wastewater Collections Supervisor and have him or her review the data in the truck or download an electronic copy onto a flash drive for viewing.
Root Control
Root control is contracted out to Duke’s, a firm that specializes in root control in sanitary sewer systems.
This is another key piece of the City's efforts to minimize or eliminate problems that could lead to a sewer blockage or spill. The City has been contracting out about three miles per year of sewer pipeline to Duke's, focusing on the old town backyard sewers. Duke's applies Razorooter II, diquat-based herbicide, using a foam that covers roots with the herbicide.
Duke's has over 40 years of experience with root-control in sanitary sewer systems and guarantees that their treatment will remove the roots in the pipelines where the herbicide is applied for one year after application. The City has Duke's crews apply the herbicide between April and May. After the application, the City will use the CCTV inspection truck and equipment to inspect the treated line multiple times to confirm that the herbicide was effective in killing the roots.
In Yuba City, most root problems are in backyard easements. The City tries to avoid jetting the lines that have been foamed to minimize damage to pipes but will do so on occasion if needed. The City's experience has been that the worst root intrusion conditions will occur after a wet winter followed by a hot summer.
The City crews use RootX for isolated root intrusion problems.
Lift Stations
In addition to the gravity pipeline network, the City owns, operates, and maintains 17 sewer lift stations.
These pumping stations lift the wastewater flowing in deeper sewers to higher pipelines so that the sewers do not get excessively deep. Deep sewers are more costly to construct and harder to maintain. The table at the end of this section summarizes the available information regarding the location, construction history, and operating characteristics of each station.
Thirteen of the lift stations (#1, #2, #3, #4, #5, #7, #9, #10, #11, #12, #13, and #15) have full SCADA control from the WWTF through 5G cellular communications. Four lift stations (#6, #14, #16, and #17) use radio signals for monitoring and control on SCADA. The remaining lift station, #8, is solely monitored indirectly, using a SmartCover sensor installed at manhole upstream of the lift station.
The SCADA system at the WWTF is monitored 24/7 and operational adjustments can be made from the WWTF for each lift station. SCADA communications provide information on wet well levels, pump run status, and operational setpoints. The City is currently working to install cellular communications at all lift stations, then plans to incorporate the SCADA system into the cellular communications system.
Five of the City's six stormwater detention basins are also connected to the WWTF's SCADA system which is monitored during storm events.
A key component of the City's efforts to minimize or eliminate sewer blockage or spill problems is the use of SmartCover Monitoring and Alarm Systems. SmartCovers provide real-time satellite manhole monitoring
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 41 of 69 and alerts of rising water levels which allows managers and operators to dispatch sewer crews to address problems before spills occur.
Following a large sanitary sewer spill occurred in 2014, the City installed SmartCovers upstream of all the lift stations which were not monitored by the SCADA system at that time. The City now has SCADA monitoring at most lift stations and has continued to increase the number of SmartCover monitoring sites as a backup alarm system and for flow monitoring at some sites.
Eighteen SmartCover monitoring units have been installed at strategic locations throughout the collections system. Most of the SmartCovers are in manholes immediately upstream of a lift station. In addition to level monitoring, SmartCovers at Lift Stations #2, #3, and #11 had flow monitoring capability as of June 2025. The SmartCovers have allowed sewer crews to identify and clear many sewer blockages before they resulted in spills.
The two main lift stations, Lift Stations #2 and #10, had historical issues with odors and problems with FOG building up in the wet wells. Therefore, the City installed ozone units that spray a mist on top of the scum and FOG blanket at Lift #10, and spray directly into the sewage solution at Lift #2. This helps keep FOG from building up in the wet wells, minimizes odor problems, and lowers chemical costs at the WWTF.
City wastewater maintenance staff conducts an on-site physical inspection of each lift station every week.
City staff also undertake an assessment of lift station maintenance needs once/month. Approximately quarterly, the crew removes grease ring buildup and vacuum up debris. Six or seven of the lift stations have occasional grease ring buildup of 5 to 6 inches per month. The crews remove grease off walls with high pressure jet spray and clean the remaining wet wells to remove grease rings once per month. Two lift stations (#2 and #10) are on a higher frequency for cleaning.
Permanent emergency generators are currently installed at Lift Stations #1, #2 and #10. Two new standby permanent generators have been purchased and are now functional at Lift Stations #3 and #14. Generator hookups have been installed at all 17 lift stations and portable emergency generators are available for power failures. Bypass fittings and valves have been installed at Lift #2 to make bypass pumping easier to set up.
The City has a binder titled “S.O.P. for Lift Station Failures, 2017” which specifies the procedures needed to set up a bypass for each lift station. This binder also contains standard procedures for cleaning and maintenance of each lift station, as well as specific things to be aware of (i.e., be aware of overhead lines, avoid during school traffic hours). Operations staff plan to update this binder to include Emergency Response Plans for each lift station.
OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 42 of 69 Station Name Location Pump
Manufacturer
Year
Installed
No. of
Pumps
Firm
Capacity
(gpm)
Total
Dynamic
Head
Power
(HP)
Variable
Frequency
Drive
LS I Del Monte Avenue and
Woodbridge Avenue Flygt 1994 3 1,450 18 5 No
LS 2 Market St. and Bird St. Flygt 2024 3 4,500 40 35
Yes (two
of three
pumps)
LS 3 Lassen Blvd. and Harter
Parkway Flygt 2004 3 1,960 30.6 IO No
LS4 Butte House and Blevin Road Flygt 2023,
2024 2 702 16.4 5 No
LS 5 Palora Avenue and Wyler
Road Flygt 2025 2 325 25 5 No
LS 6 Queens Avenue and Hwv 99 Flygt 1998 2 450 25 5 No
LS 7 Richland Road and
Glenwood Drive Flygt 1989 2 350 32.5 5 No
LS 8 Louise Avenue and Rocca
Way Flygt 1995 2 275 22.5 3 No
LS 9 Walton Avenue and Smith
Road Flygt 1995 2 300 22.5 3 No
LS IO Lincoln Avenue and Hwy 99 Flygt 2002 3 4,200 24 30 Yes LS II Garden Hwy. and Shanghai
Bend Flygt 1991 2 1,000 18 10 No
LS 12 Bogue Road and Falls Drive Flygt 1992 2 180 16 3 No LS 13 Bogue Road and Wild River
Drive Flygt 2024 2 300 22 3 No
LS l4 Parc West Drive and Stabler
Lane Flygt 2000, 2024 2 700 20 5 No
LS I5
George Washington Blvd.
and South Colusa Frontage
Road
Flygt 2006 2 1,008 35.5 12 No
LS 16 East Onstott Frontage Road
and Manchester Way Flygt 2005 2 324 25.1 5 No
LS 17 3301 East Onstott Frontage
Road Flygt 2011 2 Unknown Unknown
5 No
Stonegate Village
Maintenance crews conduct routine maintenance and replace critical components at each of the 112 services at Stonegate Village. Replacement was previously on a three-year cycle but has recently been revised to a two-year cycle. Each homeowner has a high alarm/sensor in their septic tank and have been educated to call the City if an alarm sounds. City staff responds quickly to these calls. The City would like to install gravity sewer lines to replace the STEP system infrastructure.
Table 7 - Wastewater Collection System Lift Station Summary
DESIGN AND PERFORMANCE PROVISIONS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 43 of 69
5. Design and Performance Provisions
5.1. Updated Design Criteria/Construction Standards/Specifications
WDR REQUIREMENTS
Attachment D-5.1 (pg. D-5)
“Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include component-specific evaluation of the design criteria.”
COMPLIANCE
The City manages the installation, rehabilitation, and repair of its sanitary sewer systems using the Yuba City Code of Ordinances, Title 6, Article 3 (Sewer Construction), and any Special Provisions specific to an individual project.
Article 3’s Standard Specifications include the design requirements for public sewers:
• 6-5.301 Building sewers, service laterals, and connections • 6-5.302 Public sewer construction
• 6-5.303 Sanitary sewer design requirements
These Standard Specifications and Special Provisions are used to define the project requirements to bid on a construction project. Together these documents function as guidelines and are used by City staff and consultants who perform design and construction services for the sanitary sewer system. In addition, the City uses the Standard Specifications of the California Department of Transportation as the City's Standard Specifications for the Construction Projects.
The City requires that work related to sanitary sewer system design and construction must follow the City's standard specifications, details, and special provisions. In addition, the City requires design plans, profiles, and specifications to be prepared by a California Registered Civil Engineer. The City's Public Works Department staff check the design plans, profiles, and specifications to ensure their compliance with the City's design standards before approving the plans, profiles, and specifications for construction.
The City staff modifies and/or adds additional requirements to the design and specifications based on the project needs and site conditions.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Are plan checking QA/QC processes helping to ensure adherence to the standards?
DESIGN AND PERFORMANCE PROVISIONS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 44 of 69
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
5.1.1 Ensure all project plans are approved in
accordance with the City’s Standard Specifications
and Details.
Each Project X
5.1.2 Verify design standards and hydraulic model
previously completed are adequate and
consistent with current standards of practice.
2025 X
DESIGN AND PERFORMANCE PROVISIONS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 45 of 69
5.2. Procedures and Standards
WDR REQUIREMENTS
Attachment D-5.2 (pg. D-5)
“Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.”
COMPLIANCE
Article 3 Section 6-5.304 of the City's sewer ordinance describes inspection requirements. The City's Construction Inspector conducts the inspections for all the sewer system construction work to ensure compliance with City requirements. The City will not accept any construction work which is covered/buried before inspection and approval has occurred. Typically, the City assigns a Construction Inspector to specific construction project(s). The Construction Inspector coordinates with the City's Resident Engineer and Construction Manager to resolve issues related to the construction during the construction period.
Generally, the testing includes a water pressure test, an airtest, and CCTV inspection. The City accepts the completed work only if all the required testing is completed to the satisfaction of the Resident Engineer and in conformance with the industry standards. Pump stations are also tested before final acceptance. The City requires a 1-year warranty to correct any defective construction work.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Were any design or installation deficiencies found during warranty inspections? • Are deviations from standard procedures and/or specs, testing, etc., justified and documented? • Does the City stay abreast of industry design standards and technical advances in the industry?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
5.2.1 Verify inspection procedures are
adequate and consistent with current
standards of practice
Annually X
5.2.2 Verify design standards and hydraulic
model previously completed are adequate
and consistent with current standards of
practice.
Annually X
DESIGN AND PERFORMANCE PROVISIONS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 46 of 69
RESILIENCE
Resilience is addressed in Element 5 by:
• Staying abreast of industry trends and standards.
• Performing warranty inspections of newly installed or repaired assets to evaluate design and installation practices.
• Evaluating as-built changes for trends and areas for design and performance improvements.
APPENDIX 5 INCLUSIONS:
• None
SPILL EMERGENCY RESPONSE PLAN
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 47 of 69
6. Spill Emergency Response Plan
WDR REQUIREMENTS
Attachment D-6 (pg. D-6)
“The Plan must include an up-to-date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; • Comply with the notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities;
• Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; • Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in this General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.”
COMPLIANCE
The City’s Spill Emergency Response Plan (SERP) is a stand-alone document that contains all the key elements necessary for an appropriate spill response: notification, emergency incident response, reporting, and impact mitigation. The current plan, prepared by DKF and Yuba City and dated June 2024, meets the requirements of the WDR, which became effective on June 5, 2023. Initial training was provided to affected staff, and the City would like to start conducting an annual refresher training.
A copy of the SERP is available for viewing at the City office upon request and is found on the City’s Wastewater Planning page.
SPILL EMERGENCY RESPONSE PLAN
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 48 of 69
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Have staff’s spill response efforts helped to prevent the discharge of sewage to surface waters? • Do post-spill assessments indicate staff are following the procedures outlined in the SERP? • Is SERP training effective and are trainees demonstrating adequate knowledge and abilities?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
6.1 Perform SERP training including practice
drills.
Annually, beginning
second half 2025 X
6.2 Review Post Spill Assessments to ensure
adherence with the SERP and to identify
any trends that should be addressed.
Annually X
RESILIENCE
Resilience is addressed in Element 6 by:
• Multiple staff are trained to respond to spill events. • Post-spill assessments are conducted to evaluate staff’s adherence to the SERP and to identify areas for improvement.
• Data collection forms are used to direct staff to collect all the required data to be submitted to CIWQS and are designed as a guide to a proper spill event response. • The City employees several different spill volume estimation methods to account for different circumstances.
APPENDIX 6 INCLUSIONS:
• None
SEWER PIPE BLOCKAGE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 49 of 69
7. Sewer Pipe Blockage Program
WDR REQUIREMENTS
Attachment D-7 (pg. D-7)
“The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed.
The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances;
• A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area;
• The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages.
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements; • Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance; • An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and • Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.”
COMPLIANCE
During 2008, the City experienced 15 sanitary sewer overflows. Ten of these resulted from grease blockages, five times more than from any other single source. Since FOG is a significant component of the wastewater generated by food service establishments (FSEs), they are an obvious target for source control measures to reduce spills. The City implemented a FOG control program in 2008 and since then has encouraged FSEs to install and properly maintain grease removal devices.
The requirements above are addressed in order below:
a. Public Outreach. The Public Works Department participates in various public outreach events each year, including posting videos on social media and attending the Yuba Sutter County Fair where Department staff hand out various educational brochures and promotional items. FOG educational materials which are distributed include literature aimed at residential customers on the proper disposal of fats, oils and grease. Pan scrapers are distributed to remove food, oils, and grease from cooking pans and dishes before cleansing and washing. Lid covers are distributed to encourage residents to pour their oil and grease into a can to cool it before disposing of it in the trash.
The Public Works Department outreach program also includes developing new educational brochures. The Department has several brochures that target FSEs and commercial businesses. The Department also intends to create educational door hangers for the City's residents. Department staff
SEWER PIPE BLOCKAGE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 50 of 69 will target providing these door hangers to residential neighborhoods where there are known FOG high-frequency cleaning pipelines in the collection system.
The City’s website includes a page titled Fats Oils and Grease which includes examples of FOG, describes why it is a problem, and provides tips for disposal. In addition, the City’s utility trucks have large magnet stickers on the side, showing pictures of what not to flush into the sewer system. b. Disposal. FOG which is generated by FSEs is collected in grease interceptors or grease traps which are maintained by the FSEs. The FOG that is accumulated is pumped out by licensed grease haulers hired by the FSEs and taken to a location that accepts inedible kitchen grease. The licensed grease haulers provide monthly pump-out records to the City. The City's Environmental Compliance Coordinator monitors the frequency of pump-outs by using the ACP FOG web-based software.
The Sewer Collections crew removes FOG that is generated in the collection system during their routine maintenance of pipes and lift stations. The grease removed from the collection system is disposed of at the City's WWTF.
c. Legal authority to prohibit discharges. The City’s legal authority is found in Title 6, Chapter 5, Article 12 of the City’s Municipal Code. Section 6-5.1202.b states "No FSE shall discharge FOG or cause FOG to be discharged into the public sewer that causes an SSS, exceeds a concentration level set forth in Section 6-5.208, or that may accumulate and/or cause or contribute to blockages in the public sewer."
In addition, Title 6, Chapter 5, Article 2, 6-5.208 of the City’s Ordinance Code regulates the disposal of sanitary sewage into the City’s sanitary sewer system to protect the proper functioning of the collection system.
d. Requirement to install grease interceptors, design standards, etc. Sections 6-5.1201 through 6-
5.1209 of Title 6, Chapter 5, Article 12 of the City’s Municipal Code require the installation of grease interceptors or grease traps. These sections also set forth design standards that conform with the most recent California Plumbing Code, as well as maintenance requirements, best management practices requirements, record keeping, and reporting requirements. e. Authority to inspect and enforce. Section 6-5.1206(a) of Title 6, Chapter 5, Article 12 of the City’s Municipal Code provides the authority for the Public Works Director or designee to inspect or order the inspection and sample of the wastewater discharges of any FSE to ascertain whether the FSE is complying with all requirements. The Ordinance states that the FSE shall allow the City access to the FSE premises during normal business hours for purposes of inspecting the FSE's grease removal devices and reviewing the manifests, receipts, and invoices relating to the cleaning, maintenance, and inspection of the grease removal device.
Section 6-5.1204 of Title 6, Chapter 5, Article 12 of the City’s Municipal Code Sewer pertains to system spills, public nuisance, abatement orders, and cleanup cost and notes that any excessive sewer maintenance expenses can be charged to the offending discharger by the City and any refusal to pay can constitute a violation of the ordinance.
Enforcement authority is found in Sec. 6-5.1209 of Title 6, Chapter 5, Article 12 of the City’s Municipal Code, and states "Failure on the part of any FSE to maintain continued compliance with any of the requirements set forth in Sections 6-5.1201 through Sections 6-5.1208 may result in the initiation of enforcement action, as outlined in Sections 6-5.1001- Sections 6-5.1003. Such enforcement action may include, but is not limited to, the issuance of a verbal warning, written warning, notice of violation (NOV), administrative order, administrative civil liability, and/or imposition of administrative fines and/or penalties."
SEWER PIPE BLOCKAGE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 51 of 69 With respect to staffing, the City’s Environmental Compliance Coordinator reviews the development plans for all new construction and remodeling of FSE’s prior to issuance of a building permit. This ensures that the installation of a grease removal device is incorporated into the construction of the facility and that the City's requirements and design standards are being met. Until recently, the City assigned one full time staff person to inspect and enforce the FOG program, but that position is currently vacant. The City is working toward filling the position. f. FOG-related problem areas. Higher-frequency cleaning and inspection is scheduled for pipelines where history has shown that grease or debris will cause sewer backups or spills under the normal cleaning schedule (i.e., “hot spot list”). These pipelines are scheduled to be cleaned quarterly and are also scheduled for a CCTV inspection once every year. Some of the pipelines are on the highfrequency cleaning cycle due to sags or bellies in the pipelines. These pipelines must be rodded or cleaned using chain flails attached to the rotating high-pressure jet nozzles on the cleaning machines.
The majority of the pipelines on the high-frequency cleaning list are in residential areas that do not have any restaurants located in the same area. In these areas, the City has conducted outreach focused on FOG disposal practices in apartment complexes, multiplexes and single-family homes. g. Source control measures. The City uses its business database to develop and maintain a list of all FSEs. As of 2025, a total of 234 FSEs are included in the FOG control program, with 89% of those FSEs known to have grease removal devices in operation. The City utilizes the ACP FOG management software whichhas streamlined management of the FOG control program. The ACP FOG software is web-based, which enables staff to complete inspection reports while onsite. The City strives to inspect each FSE once per year. Through increased outreach, inspection, and enforcement, it is the City's goal to minimize discharges of FOG to the sanitary sewer system through the implementation of best management practices by FSEs and cooperation from the City residents. The City’s efforts have resulted in no spills or only one spill each year since 2015.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Have there been any blockages/spills from any identified problem area? • Is the City receiving feedback on public outreach efforts? • Are the debris and other sewage solids collected during cleaning activities being disposed of appropriately?
• Have there been spills due to excessive fats, oil, grease, roots, or non-dispersible wipes discovered in the sewer system during the audit period?
• Are there repeat offenders among FSEs?
• Are enforcement trends decreasing?
• Are Source Control and Collection staff included in the plan check process?
SEWER PIPE BLOCKAGE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 52 of 69
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
7.1 Review/evaluate enforcement and
inspection findings and implement
changes as necessary.
Annually X X
7.2 Review spill rates and causes and make
changes to maintenance programs, as
necessary.
Annually X X
7.3 Create and distribute educational door
hangars
Beginning second half
2025 X
7.4 Fill vacant inspector position By January 2026 X
RESILIENCE
Resilience is addressed in Element 7 by:
• Inspection of select assets directly downstream of grease producing businesses to ensure source control is effective.
• Residential FOG outreach and education program.
• Performance of regular assessments of system assets to monitor performance. • QA/QA process for evaluating pipe cleaning effectiveness. • Daily disposal of pipe blocking materials retrieved during maintenance activities.
APPENDIX 7 INCLUSIONS:
• None
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 53 of 69
8. System Evaluation, Capacity Assurance, Capital Improvements
WDR REQUIREMENTS
Attachment D-8 (pg. D-)
“The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• A capital improvement plan.”
8.1. System Evaluation and Condition Assessment
WDR REQUIREMENTS
Attachment D-8.1 (pgs. D-7/D-8)
“The Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available;
• Identify and justify the amount (percentage) of its system for its condition to be assessed each year;
• Prioritize the condition assessment of system areas that:
• Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies;
• Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas;
• Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List.
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection method;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State; • Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
• Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.”
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 54 of 69
COMPLIANCE
The above requirements are addressed below:
a. The City’s collection system evaluation involves every component of the City collection system, including pipelines, manholes, and pump stations. The assessment of pipeline condition is the most significant condition assessment responsibility the City has. It is of key importance to regularly perform pipeline condition assessments to initially establish a baseline condition and to monitor changes over time. City staff assess the condition of laterals using push cameras and pole cameras which can be dropped into manholes. In addition, the City has 18 smart covers on manholes within the sewer line, most of which are upstream of a lift station. b. The City has historically cleaned the entire collection system on a four-year interval CCTV inspects the system on a five-year interval. The City believes the six-year inspection interval to be appropriate because most of the pipes are in good condition, with only 27 locations that receive quarterly cleaning (those locations on the hot spot list), the city cleans each line every three years, and the City has maintained a low spill rate. The City periodically reviews and evaluates its pipe performance and inspection/cleaning intervals and may adjust the schedule to a less-frequent interval. c. Several of the City’s lift stations are near surface waters. Both Lift Station #2 and #10 have spilled into Gilsizer Slough. Lift Station #10 is immediately adjacent to Gilsizer Slough and is not fenced. The City will evaluate security at all its lift stations and the need to prevent potential vandalism with a resulting environmental impact. The entire collection system is at least 3,000 feet from the City’s drinking water intake.
d. The City assesses system conditions using visual observation, video surveillance, smart covers on manholes, pole cameras, and CCTV camera service. The City’s collection system includes pipes which run through private backyards in the older part of town. This portion of the collection system is more susceptible to root intrusion and therefore the City prioritizes root control activities (herbicide application followed by inspection) in this area.
e. The City is currently not aware of any exiting of sewage from the collection system. The City actively inspects and maintains its collection system to prevent sewage from exiting and impacting the environment.
f. The City documents all inspections, maintenance, and evaluations of the sewer system. When the CCTV truck comes into the Corporation Yard at the end of the shift, the data is uploaded as the truck drives into its parking bay. The data is then transferred to the Engineering Division where the data is reviewed and used to prioritize future work. All documents are maintained at the City office or in the iWorQ program.
g. The City is immediately adjacent to the Feather River and downstream of the Oroville Dam.
Stormwater flows to large retention basins and is then pumped over the levee and into the Feather River or flows into one of several sloughs running through town. The City’s collection system is vulnerable to flooding in the event of a levee break, dam failure, or severe rain. The City participated in and will implement the 2021 Sutter County Local Hazard Mitigation Plan Update. In addition, the City will continuously monitor for change and review the potential impacts of climate change during each audit. If potential impacts are identified, appropriate action will be taken and the SSMP will be updated.
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 55 of 69
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Has the City maintained its schedule for inspecting the sewer assets listed below and is data being reviewed in a timely manner?
o CCTV Gravity Mains
o Laterals
o Manholes
o Pump Stations
• Are inspection efforts discovering deficiencies in a timely manner? • Are maintenance and inspection activities being properly documented?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
8.1.1 Review/evaluate enforcement and
inspection findings and implement
changes as necessary.
Annually X X X
8.1.2 Review spill rates and causes and make
changes to maintenance programs, as
necessary.
Annually X X X
8.1.3 Hold meetings to discuss any issues that
may result from climate changes. Annually X X X
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 56 of 69
8.2. Capacity Assessment and Design Criteria
WDR REQUIREMENTS
Attachment D-8.2 (pgs. D-8/D-9)
“The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow conditions that cause or contributes to spill events; • The appropriate design storm(s) or wet weather events that causes or contributes to spill events.
• The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.
The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information;
• Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higherintensity storm events as a result of climate change; • Increases of erosive forces in canyons and streams near underground and above-ground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and
• Necessary redundancy in pumping and storage capacities.”
COMPLIANCE
The City hired West Yost Associates to develop the 2020 Wastewater Master Plan for both the collection system and the WWTF. The Master Plan projected dry and wet weather scenarios with a hydraulic model using lnnovyze® lnfoSewer™ software that allows for a time-varying flow analysis of dry weather and peak wet weather conditions.
While the 2006 hydraulic model analyzed trunk sewer lines that were 12" in diameter or larger, small diameter gravity mains that were not previously included in the hydraulic model were added to the new model as part of the 2020 model update. The City’s GIS database was used to populate the model with the previously unmodeled lines.
The gravity line analysis found that 44 modeled manhole-to-manhole segments totaling approximately 11,000 lineal feet of pipe ranging from 8- inches to 36-inches in diameter exceeded the performance criteria developed for existing peak hourly wet weather flow conditions design conditions. However, the model results indicate the exceedances in question all produced minimal surcharging (<1 foot). It was therefore concluded that no capacity improvements to existing gravity mains were required and that no sanitary sewer spills were expected in the near future.
The hydraulic model also determined that of the existing collection system lift stations, only lift station #9 and lift station #10 have insufficient firm capacity to convey existing modeled peak flows. Due to the different options being considered for expanding the capacity of the collection system, it was recommended
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 57 of 69 that any capacity improvements to these lift stations be evaluated within the context of future development.
While not included as part of the Wastewater Master Plan, the numerous extreme storms that pummeled Northern California during the 2022 - 2023 wet season did not result in any wet weather sewer spills in Yuba City. This seemed to confirm the results of the existing conditions modeling.
Modeling for the future first considered buildout capacity needs, as these needs influence what is required for near-term development. While different scenarios were analyzed, the hydraulic evaluation of four different buildout flow scenarios concluded that there were no significant differences among the collection system modeling results.
The Master Plan includes the typical design criteria for new sanitary sewer system design. The capacity analysis of the existing system was conducted using typical design criteria. The flow assumptions in the design criteria include an allowance for development density, flow per unit, and I&I contributions. The design criteria and the flow assumptions will be refined through future flow monitoring as needed.
In FY 2024 -2025, the City contracted with West Yost to update the hydraulic model upon which the Master Plan was developed.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Number of capacity-related spills or surcharge condition during the audit period. • Has the system responded to rain events as indicated by the hydraulic model? • Has there been any changes to zoning designations (residential, commercial, industrial)?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
8.2.1 Monitor/evaluate significant rain events
to see if they exceed the design storm in
the hydraulic model.
Each significant rain
evet X X X
8.2.2 Identify and monitor flood-prone areas
susceptible to erosion from rain events
After each significant
rain event X X
8.2.3 Monitor flows in each basin and update
the hydraulic model
Per Engineering
Depart schedule X
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 58 of 69
8.3. Prioritization of Corrective Action
WDR REQUIREMENTS
Attachment D-8.3 (pg. D-9)
“The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.”
COMPLIANCE
The CIP projects are prioritized based on the latest master plan, hydraulic modeling results, and operational maintenance issues. The CIP projects are evaluated on an annual basis, and the evaluation process considers the latest issues, needs, and risks. Inflow and infiltration reduction measures are also implemented through the CIP projects.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Has the City adhered to its system evaluation/condition assessment schedule? • Has the City adhered to its prioritization/corrective procedures for sewer repair and capacity improvement projects?
• Have projects been completed before deficiencies caused failures?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
8.3.1 Utilize all available data for prioritizing
corrective actions considering severity
and consequences of potential spills.
Each CIP Update
X
8.3.2 Maintain documents and recordkeeping
of system evaluation and condition
assessment inspections and activities.
Continuously
X
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 59 of 69
8.4. Capital Improvement Plan
WDR REQUIREMENTS
Attachment D-8.4 (pg. D-9)
“The capital improvement plan must include the following items:
• Project schedules include completion dates for all portions of the capital improvement program;
• Internal and external project funding sources for each project; and • Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.”
COMPLIANCE
The 2020 Wastewater Master Plan includes a Capital Improvement Program (CIP) which recommends projects to address system improvements regardless of an increase in service area population. With respect to the collection system, (a) gravity main and manhole condition-related improvements (non-capacity related) total $49.7 million over a 20-year period and (b) lift station condition and capacity-related improvements total $32.5 million over a 20-year period.
The Master Plan also includes a CIP to address future growth. For the near-term improvements, the total estimated capital cost is approximately $115 million. For buildout conditions, the total estimated capital cost ranges from approximately $174 million to $209 million.
The City relies on itsMaster Plan to plan for future growth, to secure needed funding, and to prioritize projects based on the City's development needs. The Master Plan identified alternatives to expand the City's sewer collection system (including lift stations) to accommodate the new growth. The City updates the Hydraulic Model as needed. As stated previously, the City has not identified any portions of the sewer collection system that are currently experiencing or contributing to a sanitary sewer discharge caused by hydraulic deficiency.
Capacity enhancement projects are completed through the short term (5 year) CIP and use the Master Plan as a road map for longer term planning for intervals up to 20 years. As part of the Capital Improvement Program, projections are prepared to determine the future funding requirements.
The City’s Adopted CIP Budget for FY2022-2027 includes numerous categories of projects, including for wastewater (starting at page 90). The CIP list shows the project start and completion dates by fiscal year. Typically, the projects are funded using the City's CIP project reserves, existing rates, SRF loans and bond financing. New customers pay for CIP projects through the current connection fee. The GIP project list splits the cost of each individual project among existing and new customers based on the project benefitsto existing and new customers.
Technical evaluations were prepared to ensure that the projects meet the design standards, the City's needs and other related requirements. The GIP projects were finalized based on the technical evaluations and are scheduled for design and construction.
The table below includes collection-system related capital improvement projects completed in the last five years and those planned for the next five years.
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 60 of 69 Summary of Capital Improvement Program Projects: Current Wastewater Projects Account Project Name
Current
Funding
Adopted
2022-23 2023-24 2024-25 2025-26 2026-27
Projected
Funding
1103 Recurring Plant Projects 560,000 575,000 200,000 200,000 200,000 200,000 1,935,000 1104 Recurring Collection or Rehabilitation System 183,000 850,000 750,000 250,000 250,000 250,000 2,533,000 1105 Lift Station Improvements 1,154,000 100,000 100,000 100,000 100,000 100,000 1,654,000 1116 Secondary Clarifier Improvements 316,000 300,000 300,000 300,000 150,000 150,000 1,516,000 1155 Stonegate Treatment Works Demolition 424,000 50,000 50,000 50,000 50,000 50,000 674,000 1156 New Outfall and River Levee Crossing 675,000 300,000 40,000,000 40,975,000 1179 Oxygen Generation System Improvements 209,000 150,000 6,000,000 6,359,000 1196 Rehabilitation of the West Chlorine Contact Basin 1,500,000 1,500,000 1219 Secondary Clarifier No.4 122,000 9,000,000 9,122,000 1229 Capitalization Fund 3,367,000 500,000 500,000 500,000 500,000 500,000 5,867,000 1252 Wastewater Treatment Facility Improvements 538,000 538,000 1277 Harter-Bridge Sewer Trunk Connection 2,400,000 2,400,000 1290 Third Anaerobic Digester 350,000 10,000,000 10,350,000 1291 Primary Clarifier Rotary Drum Thickener 250,000 250,000 250,000 750,000 1295 Bogue Road Sewer Extension 2,000,000 1,500,000 3,500,000 1303 Regional Septic System Conversion 100,000 100,000
1304 Temporary Discharge Point 003 450,000 450,000
$13,698,000 $5,475,000 $48,150,000 $11,400,000 $10,250,000 $1,250,000 $90,223,000 Current Adopted Projected
Sources of Funds Funding 2022-23 2023-24 2024-25 2025-26 2026-27 Funding General
Transportation Development Act
Streets and Roads
DIF
Federal Grant 4,000,000 4,000,000
SRF 6,000,000 9,000,000 15,000,000
CDBG 100,000 100,000
Water
Wastewater 9,160,000 5,375,000 2,150,000 1,400,000 1,250,000 1,250,000 20,585,000 Other 538,000 40,000,000 10,000,000 50,538,000
$13,698,000 $5,475,000 $48,150,000 $11,400,000 $10,250,000 $1,250,000 $90,223,000 Table 8 - Summary of Capital Improvement Program Projects: Current Wastewater Projects
SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 61 of 69
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Has the City’s capital improvement plan schedule been adhered to?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
8.4.1 Hold regular coordination meetings, with
all parties, to help keep the projects on
track and resolve issues that may arise in
a timely manner.
Annually
X X X X
8.4.2 For schedules that are not followed,
justify and document the reason.
Each Delayed Project
X X
RESILIENCE
Resilience is addressed in Element 8 by:
• Is there an annual review of the Capital Improvement Plan by all appropriate individualsincluding both Engineering and Operations?
APPENDIX 8 INCLUSIONS
• None
MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 63 of 69
9. Monitoring, Measurement, and Program Modifications
WDR REQUIREMENTS
Attachment D-9 (pg. D-9)
“The Plan must include an Adaptive Management section that addresses Plan-implementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
• Monitoring the implementation and measuring the effectiveness of each Plan element; • Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
• Identifying and illustrating spill trends, including spill frequency, locations, and estimated volumes.”
COMPLIANCE
The above requirements are addressed below:
a. The City maintains accurate and relevant inspection and maintenance records for the collection system, including field data such as pipe cleaning and inspection frequencies, FSE inspections, and information regarding spills. Much of the documentation is maintained electronically, which allows for ease of access and analysis. This helps City staff to make sound decisions and prioritize activities when dealing with the routine and the unexpected. Monitoring of the City’s SSMP focuses on each element in terms of its implementation and effectiveness. The SSMP has been designed to include key performance indicators for each element, which are used to measure effectiveness. In addition, implementation responsibilities are included for each element to help ensure the SSMP is being implemented as intended.
b. The City assesses the success of maintenance and operation activities by analyzing the monitoring data and trends to measure the effectiveness of each element of the SSMP. Changes can and are readily made to the planned work as needed to address higher priorities in the collection system.
c. The City is committed to continuous improvement and monitors and evaluates performance of work programs and SSMP elements to ensure intended outcomes are achieved while looking for areas for improvement. Although the SWRCB requires that the SSMP be updated every six years, the SSMP is considered as a dynamic document and may require updating on a more frequent basis. Routine changes to administrative information, notwithstanding, minor changes will likely be required to address improvements identified through the SSMP Audit or through modifications required as conditions change.
d. The City monitors spill trends, at a minimum every three years during required audits, utilizing the CMMS database, inspection records and CIWQS data. These resources are helpful in planning and programing work, and adjusting as needed, enabling the City to be adaptive and capitalize on lessons learned.
MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 64 of 69
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Are SSMP Elements being periodically evaluated for effectiveness? • Are work activities and spill events being documented? • Has a plan and schedule been established to address audit findings/deficiencies from the last audit? • Is Trend Analysis being performed on spill causes?
• Have work programs been assessed and updated as necessary?
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
9.1 Assess work programs to ensure
outcomes are as intended.
Annually
X X
9.2 Ensure work programs and the SSMP are
updated based on assessments.
As Needed
X X
9.3 Monitor and evaluate spill trends.
Document efforts.
Annually
X X
RESILIENCE
Resilience is addressed in Element 9 by:
• Development of key performance indicators to measure effectiveness of the SSMP. • Performing periodic reviews of the SSMP to help ensure it is being properly implemented. • Developing and adhering to a timeline to correct deficiencies found during the audit process. • Periodically evaluating work programs to help ensure effectiveness.
APPENDIX 9 INCLUSIONS:
• None
INTERNAL AUDITS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 65 of 69
10. Internal Audits
WDR REQUIREMENTS
Attachment D-10 (pg. D-10)
“The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of this General Order.”
COMPLIANCE
The City submitted its most recent audit in compliance with the February 2, 2025, deadline and will complete audits every three years moving forward. The objective of the audit is to evaluate compliance, implementation and effectiveness of the SSMP. Additionally, the SSMP includes a description of how the City will comply with the requirements of each Element. The audit review includes an evaluation to determine if compliance has been met. A list of priority improvement opportunities will be prepared and updated as part of the audit program. Improvement opportunities will be used to prioritize and develop program modifications and will be initiated based on the priority and the available funding. An overview of SSMP related work completed between audits will be included in the program audits.
The Sewer Collections Division will perform periodic internal audits to determine the effectiveness of each element of the SSMP and will generate system metrics on an annual basis for the purpose of tracking, monitoring and adjusting the performance of the SSMP activities. The primary focus in the evaluation of system metrics will be the elimination of preventable spills and reduction of the impact of those spills that do occur.
Implementation is evaluated by determining if the City is executing the SSMP as stated.
Effectiveness is evaluated by using key performance indicators, which have been developed specifically for each element. An additional evaluation is performed to comply with Specifications 5.6 addressing resilience.
Resilience indicators have been developed for each element. These indicators serve to demonstrate how resilience is built into the SSMP and inspection, maintenance and spill response activities (see Appendix 12).
Any deficiencies discovered through the audit process are noted and a plan and schedule to implement corrective measures are established.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Have audits been performed as required?
• Have the audits assessed compliance, implementation, and effectiveness? • Have deficiencies been identified?
• Has a plan and schedule to rectify the deficiencies been established?
INTERNAL AUDITS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 66 of 69
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
10.1 Schedule audits in advance of due dates
to ensure adequate time to complete. City
has 6 months to complete the audit from
the end of the audit period.
Beginning at end of
audit period X X X X
10.2 Ensure a plan and schedule is developed
to address deficiencies.
Once the Audit is
completed X X X X
RESILIENCE
Resilience is addressed in Element 10 by:
• Periodically evaluating key performance indicators during the audit period to assess effectiveness and make corrections, if necessary, prior to the audit.
• Evaluating previous audits to ensure deficiencies have been rectified. • Scheduling the audit due dates and completing the audit on time.
APPENDIX 10 INCLUSIONS:
• 10.1 2021-2024 SSMP Audit
COMMUNICATION PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 67 of 69
11. Communication Program
WDR REQUIREMENTS
Attachment D-11 (pg. D-10)
“The Plan must include procedures for the Enrollee to communicate with:
• The public for:
• Spills and discharges resulting in closures of public areas, or that enter a source of drinking water; and
• The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
• System operation, maintenance, and capital improvement-related activities.”
COMPLIANCE
a. When the City experiences a spill, it is standard procedure to secure the affected area and keep the public away. This is generally done using barricades, cones and caution tape. Should the City experience a spill that may require closure of public areas or enter a source drinking of water, signs will be immediately placed indicating the issue and providing contact information. Staff will remain on site to provide an additional safety factor until appropriate authorities respond and direct otherwise. In all cases, the City will follow the advice of higher authorities, such as the local environmental health department and other regulatory authorities. b. There are several opportunities for stakeholders and the public to participate and provide input into the development and update of the City’s SSMP. During its initial development stage, as with each SSMP Audit and update of the SSMP, the SSMP and related documents are presented to the City Council for review and acceptance. With the adoption of the new WDR, SSMP Audits are now performed every three years and re-certification and acceptance of updated SSMPs are required every six years. Prior to each City Council Meeting, these documents are included in Agenda packet which are readily available for review on the City’s website.
The City’s website includes the Wastewater Planning page which has links to the City’s 2020 Wastewater Master Plan, this SSMP, and the 2007 Yuba-Sutter Regional Recycled Water Maste Plan.
The City’s Public Works page provides the public with several ways to contact the City. c. This section does not apply.
EFFECTIVENESS
The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element:
• Does the City place all SSMP action items on the agenda for regular counsel/board meetings? • Does the City have signage, or other means, readily available to notify the public of environmental or public risk factors related to a sewage spill?
• Does the City perform outreach to residential customers?
COMMUNICATION PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 68 of 69
IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PW
Maint
Supt
Eng Collex
Super
Env
Comp
11.1 Ensure the City Council approves the
SSMP per schedule. Every 6 years X X
11.2 Ensure the SSMP is posted on the City
website and the link functions properly. Annually X X
11.3 Ensure Sewage Spill Warning signs are
readily available to communicate with the
public when necessary
Annually X
RESILIENCE
Resilience is addressed in Element 11 by:
• Use the SSMP as a tool to communicate to the public how the City is managing the system. • Maintain a consistent presence in the service area by attending community events or issuing periodic newsletters or other communications to the public.
• Make it clear and easy for the public to contact the City.
APPENDIX 11 INCLUSIONS
• None
APPENDICES
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 69 of 69
LIST OF APPENDICES
APPENDIX 1 • 1.1 Gravity Main Details
APPENDIX 2 • None
APPENDIX 3 • None
APPENDIX 4
• 4.1 Example Training Record
• 4.2 Spill Response Training Requirements for Contracted Services • 4.3 Example Equipment Inventory
• 4.4 Example Manole Inspection Form
APPENDIX 5 • None
APPENDIX 6 • None
APPENDIX 7 • None
APPENDIX 8 • None
APPENDIX 9 • None
APPENDIX 10 • 10.1 2021-2024 SSMP Audit
APPENDIX 11 • None
DETAILED INFORMATION FOR THE YUBA CITY COLLECTION SYSTEM © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 1 of 10 Appendix 1.1: Detailed Information For The Yuba City Collection System Gravity Mains by Diameter (Source 2023 SSMP)
Diameter (inches) Length (feet) Length (miles) Percent of System (%) 4 1,960 0.37 0.21
6 249,899 47.33 27.4
8 405,352 76.77 44.44
10 57,922 10.97 6.35
12 80,881 15.32 8.87
14 5,223 0.99 0.57
15 20,611 3.9 2.26
16 3,041 0.58 0.33
18 34,634 6.56 3.8
20 295 0.06 0.03
21 5,749 1.09 0.63
24 13,562 2.57 1.49
27 8,925 1.69 0.98
30 1,892 0.36 0.21
33 7,525 1.43 0.82
36 11,613 2.2 1.27
42 3,089 0.59 0.34
Total 912,174 172.76 100.0
All existing GIS information is subject to confirmation, per City staff Gravity Mains by Material (Source 2023 SSMP)
Pipe Material Length (feet) Length (miles) Percent of System (%) Asbestos Cement (AC) 92,150 17.45 10.1
Cast Iron Pipe (CI) 1,464 0.28 0.16
Concrete (CONC) 38,998 7.39 4.28
Ductile Iron Pipe (DIP) 12,444 2.36 1.36
High-Density Polyethylene (HDPE) 291 0.06 0.03
Heavy-Walled Centrifugal Pipe (HWCP) 1,192 0.23 0.13
Polyvinyl Chloride (PVC) 3,77 0.07 0.04
Reinforced Concrete Pipe (RCP) 1,354 0.26 0.15
Reinforced Plastic Mortar (RPM) 9,454 1.79 1.04
Vitrified Clay Pipe (VCP) 754,449 142.89 82.71
Total 912,174 172.76 100.0
Approximate Age of Gravity Mains
Installation Decade Approx Age (Yrs) Length (feet) Length (miles) Percent of System (%) Pre-1950s 80+ 51,371 9.73 5.63
1950s 70 20,812 3.94 2.28
1960s 60 14,445 2.74 1.58
1970s 50 71,294 13.5 7.82
1980s 40 142,410 26.97 15.61
1990s 30 216,549 41.01 23.74
2000s and later 20 or Less 208,202 39.43 22.82
Unknown Unknown 187,089 35.43 20.51
Total - 912,174 172.76 100.0
SPILL RESPONSE REQUIREMENTS FOR CONTRACTED SERVICES
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 2 of 10 Appendix 4.1: Spill Response Requirements for Contracted Services Contracted services personnel performing work on the Agency sewer system who cause or otherwise discover a sewage blockage or spill are required, at a minimum, to respond as detailed below.
1. Immediately notify the Agency of any sewer problem encountered. During business hours, call (503) 822-4626 or after-hours call (530) 822-4661.
Spill
Surcharging pipe
Obstruction
2. Make attempts to contain the spill or prevent sewage from reaching surface water or drainage system.
Absorbent
Dirt
Sandbags
3. Cordon off the area to keep the public safe.
Traffic cones
Barricades
Caution Tape
4. Provide photo/video documentation.
Take Photo(s) of the spill appearance point.
Take 10 second video of the active spill (from approximately 10 feet away) Take photo of the affected area.
5. Remain onsite until Agency staff arrives and provide:
The time problem was discovered.
The time the spill was discovered (if different from time problem was discovered) This was discussed/reviewed with: Date: MM/DD/YYYY
Contractor Representative:
Print Name Signature
Agency Representative:
Print Name Signature
EXAMPLE TRAINING RECORD
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 3 of 10 Appendix 4.2 Example Training Record
Topic: Training Date: MM/DD/YYYY
Trainer: Trainer Position/Company:
Training Location/Environment:
Basis for Training & Materials Used:
1. 2.
3. 4.
5. 6.
Comments:
(Basis Examples: SOP, Power Point, Manufacturer’s Recommendations, on-the-job-training. Reference Title when applicable) Attachments ☐
TRAINING DESCRIPTION:
(Describe in detail what training entailed)
TRAINING METHOD
(Check all that apply)
☐ Classroom/Instructor ☐ Breakout Sessions ☐ Tabletop Exercise ☐ Coaching/Mentoring ☐ Hands-on ☐ Drill ☐ Role Playing ☐ Computerized/on-line Training ☐ Other:
Attachments ☐
EXAMPLE TRAINING RECORD
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 4 of 10
METHOD TO QUALIFY TRAINEES
(Check all that apply)
☐ Exam/Quiz ☐ Assessment of Ability ☐ Attendance/Participation ☐ Other:
(Maintain Qualifying Records with Training Records)
Trainer Signature: Date: MM/DD/YYYY
Length of Training (Time) hours
EXAMPLE TRAINING RECORD
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 5 of 10
SIGNATURE SHEET
Trainee Name (Print) Signature Qualified Qualified By (initials) ☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
EXAMPLE EQUIPMENT INVENTORY LIST
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 6 of 10 Appendix 4.3 Yuba City Collection System: Example Equipment Inventory List CORPORATION YARD: SEWER MAINS AND STONEGATE SYSTEM
Pipe and fittings for sewer line repairs and all replacement and repair parts associated with the Stonegate STEP systems are stored at the Corporation Yard. Sewer crews maintain sewer mains and respond to emergencies throughout the City as scheduled and as needed. Sewer crews replace the pumps, valves, bio baskets, and inspect the associated electrical and mechanical equipment for each home in the Stonegate area on a threeyear rotation and respond to emergencies as needed. The following are the minimum quantities of pipe, fittings and supplies stored at the Corporation Yard. The Sewer System Supervisor tracks the inventory and ensures equipment and supplies are ordered as needed to maintain adequate inventories.
Corporation Yard: General Inventory List
• 8-inch SDR 26 pipe • 4-inch ABS couplings
• 6-inch SDR 26 pipe • 4-inch plastic-to-plastic Fernco • 4-inch SDR pipe • 6-inch Fernco sheer band couplings clay-to-clay • 4-inch ABS pipe • 6-inch Fernco sheer band couplings concrete-to-clay • 4-inch 90's ABS fittings • 8-inch Fernco sheer band couplings clay-to-clay • 4-inch 90's ABS fittings • 8-inch Fernco sheer band couplings concrete-to-clay Corporation Yard: Stonegate Supplies
• 12 pumps • 8 lids/ bolt kits
• 20 check valves • 12 valves on/off
• 35 float trees • 6 alarm switches
• 12 bio baskets • 2 panel boxes
• 2 bio containers
SPILL RESPONSE EQUIPMENT
Most equipment for responding to Sanitary Sewer Spills is stored at the Corporation Yard. Additional equipment is stored at the WWTF. The following table lists the minimum quantities of stored equipment.
Spill response equipment stored at the Corporation Yard • Two 25 kW portable generators • 150 kW portable generator • One 6-inch portable trash pump • Two Combination Vactor/Hydro-Jet trucks • Off Roader Hydro-Jet • One 3-inch portable submersible pump • One CCTV Truck • One mini-excavator
Spill response equipment stored at the WWTF
• Two 25 kW generators • One 180 kW generator
• One 180 kW generator
EXAMPLE EQUIPMENT INVENTORY LIST
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 7 of 10
LIFT STATIONS
The following table describes the lift stations and example equipment inventory.
LS Location Pumps Model Volts Generator Inventory notes 1 Del Monte Ave &
Woodbridge Ave 3 each 5 HP Flygt 3102 460 Has a Standby 1 spare for all Flygt 3102 pumps 2 Market St. &
Ainsley Ave 3 each 30 HP Flygt 3102 460 Has a Standby 1 spare for all Flygt 3102 pumps 3 Lassen Ave &
Harter Rd 3 each 10 HP Flygt 3127 460 Has a Standby 1 spare for all Flygt 3127 pumps 4 Blevin Rd & Butte
House Rd 3 each 5 HP Flygt 3102 230 No Generator/
25 kVA 1 spare for all Flygt 3102 pumps
5 Palora Ave &
Whyler Rd 2 each 5 HP Flygt 3102 230 No Generator/
25 kVA 1 spare for all Flygt 3102 pumps
6 Queens Rd & HWY
99 2 each 7.5 HP Flygt 3127 230 No Generator/ 25 kVA 1 spare for all Flygt 3127 pumps 7 Richland Rd &
Glenwood Dr 2 each 5 HP Flygt 3102 230 No Generator/ 25 kVA 1 spare for all Flygt 3102 pumps 8 Louise Ave &
Rocca Way 2 each 5 HP Flygt 3102 230 No Generator/ 25 kVA 1 spare for all Flygt 3102 pumps 9 Smith Rd & Walton
Ave 2 each 5 HP Flygt 3102 230 No Generator/
25 kVA 1 spare for all Flygt 3102 pumps
10 Lincoln Rd Gilisizer
& Hwy 99 3 each 30 HP Flygt 3102 460 Has a Standby
Station normally operates on two of the three
pumps. One spare on the shelf. Also, can use spare
Flygt 3085 (10 HP) if needed.
11 Garden Hwy &
Shanghai Bend Rd 2 each 10 HP Flygt 3127 230 No Generator/ 25 kVA 1 spare for all Flygt 3127 pumps
12 Bogue Rd & Falls
Dr 2 each 5 HP Flygt 3102 230 No Generator/
25 kVA 1 spare for all Flygt 3102 pumps
13 Bogue Rd & Wild
River Dr 2 each 3 HP Flygt 3102 230 No Generator/
25 kVA 1 spare for all Flygt 3102 pumps
14 Stabler Ln & Parc
West Dr 2 each 5 HP Flygt 3127 230 Has a Standby 1 spare for all Flygt 3127 pumps 15 George Wash Blvd
& Hwy 20 2 each 12 HP Flygt 3085 460 No Generator/ 25 kVA No spares on the shelf. Can use spare Flygt 3085 (10
HP) if needed. Rebuild kit in stock in warehouse.
16 E Onstott Rd &
Manchester Ave 2 each 5 HP Flygt 3102 230 No Generator/ 25 kVA 1 spare for all Flygt 3102 pumps 17 3301 E Onstott Rd 2 each 5 HP Flygt 3102 460 No Generator/ 25 kVA 1 spare for all Flygt 3102 pumps
EXAMPLE MANHOLE INSPECTION FORM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 8 of 10 Appendix 4.4 Example Manhole Inspection Form
Manhole # Depth Inspection Date By
(Rim to Invert)
Lid Type: Bolt down Standard 26” Standard 36” Other: Needs Manhole Marker Access: Accessible Restricted Seasonal
Access Notes:
Comments:
Evidence of: High Water Vermin
Frame & Cover OK
Broken/Cracked Offset Wrong Lid Type Improper Grade Bolts Missing Damaged Threads Other Problem:
Comments:
Action Taken:
Grade Rings OK
Broken/Cracked Offset I & I / Rate H2S Damage / Rate Roots / Rate Other Problem:
Comments:
Action Taken:
Cone OK
Broken/Cracked Offset I & I / Rate _____ H2S Damage / Rate _____ Roots / Rate _____ Other Problem:
Comments:
Action Taken:
EXAMPLE MANHOLE INSPECTION FORM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 9 of 10 Barrel OK
Broken/Cracked Offset I & I / Rate H2S Damage / Rate Roots / Rate Other Problem:
Comments:
Action Taken:
Bench OK
Broken/Cracked Offset I & I / Rate H2S Damage / Rate Roots / Rate Other Problem:
Comments:
Action Taken:
Channel OK
Broken/Cracked Offset I & I / Rate H2S Damage / Rate Roots / Rate Other Problem:
Comments:
Action Taken:
EXAMPLE MANHOLE INSPECTION FORM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Yuba City use only. Page 10 of 10 Indicate Problem, Rating and Location by drawing on Diagram(s) below.
1 City of Yuba City
Sewer System Management Plan (SSMP)
Audit Period August 3, 2021 – August 2, 2024
Report Date: January 30, 2025
SSMP Audit Committee:
Katherine Willis, Environmental Compliance Manager
Eduardo Ramirez, Wastewater Collections Supervisor
Mandy Barker, Administrative Assistant
Julian Singh, Wastewater Collections Maintenance Worker II Lain Asher, Wastewater Collections Maintenance Worker I Edgar Ramirez, Wastewater Collections Maintenance Worker II Report Prepared by:
Katherine Willis, Environmental Compliance Manager
2 Overview
The City operates the City of Yuba City collection system and its satellite, the Stonegate Village collection system.
System Name Waste
Discharger
Identification
Number
Audit Period Audit
Due Date
Yuba City CS 5SSO11100 8/3/2021 – 8/2/2024 2/2/2025
Stonegate Village CS 5SSO11060 8/3/2021 – 8/2/2024 2/2/2025 The Yuba City sewer system includes 173 miles of gravity pipeline, ranging from 4 inches to 42 inches in diameter. Stonegate Village is served by a septic tank effluent pumping (STEP) system, with 1.85 miles of pressurized sewer lines.
Audit Purpose and Background
The purpose of the SSMP audit is to evaluate the effectiveness of the City’s efforts to manage, design, operate, and maintain the sanitary sewer system. The audit includes an assessment of the SSMP’s compliance with mandated requirements, an evaluation of the effectiveness of the City’s current program, identification of elements needing to be updated, and recommended improvements.
This report summarizes the results of the 2025 audit of the Sewer System Management Plan by the City of Yuba City SSMP Audit Committee. The audit covers the period August 3, 2021 through August 2, 2024, and was completed with assistance from the Maintenance, Utilities, and Engineering Divisions of the City’s Public Works and Development Services Divisions.
The City has been actively upgrading the sanitary sewer system since 2012 through capital improvement projects and its operations and maintenance activities. Over time, the City has succeeded in significantly reducing the number and volume of wastewater spills.
This reflects a combination of operational practices, equipment acquisition, and improvements to the collection system.
3 In the years leading up to this audit period, the City conducted the following activities:
• DowntownAreaCollection System Rehab/Replacement
Over $10 million was invested to replace and rehabilitate sewer mains in the Yuba City downtown core district from 2012 through 2014. Many segments of the City’s collection system dated back to the early 1900s.
Most of the sewer pipelines in this project area were constructed in 1926.
• SmartCoverMonitoring
The City started installing SmartCover System sensors in manholes beginning in 2014 to detect potential lift station problems, and provide alarms if lift stations were not keeping up with the necessary pumping rates.
• Generators
Permanent standby generators were installed at three lift station sites.
Generator hookups were installed at all 17 lift station sites. • Lift Station Odor Control
Ozone odor control systems were installed at Lift Station #2 and Lift Station #10.
During the audit period, the following project was completed:
• Sewer Main Lining Project
In 2021, the City relined approximately 2,590 linear feet of 42-inch Techite pipe trunk line from Lincoln Road and the Garden Highway to the WWTF. The 2020 Wastewater Master Plan recommended the removal or rehabilitation of 9,420 feet of Techite reinforced plastic mortar pipe in the City’s wastewater collection system due to its high failure rate.
4 Operations and Maintenance Projects and Initiatives
As outlined in the first column of the following table, the City is focusing on the following elements of its collections system operations and maintenance program. The second column provides an assessment of the activities that occurred during the audit period.
May 2023 SSMP Update Guidance August 2021 – August 2024 Performance Sewer jetting work with a goal to clean the
collection system on a 3-year cycle.
A review of sewer jetting records over the
audit period indicates the Collections crew is
close to meeting this target.
Sewer CCTV work with a goal to inspect the
collection system on a 5-year cycle.
A review of TV inspection records indicates
the Collections crew is close to meeting this
target.
Contracted chemical root control
using an herbicide to kill roots that
have grown into the sewer system.
Roots are particularly problematic
where sewer mains are located in
backyard easements.
The City contracts for a company
to treat about 3 miles a year. Due
to a sanitary sewer spill (SSS) in
May 2023, an additional line
segment was added to this
program to prevent future spills at
this location.
High-frequency cleaning of pre-selected
pipeline segments where history has shown
that grease or debris will cause sewer
backups or SSSs unless cleaned on a high
frequency
The City replaced sewer mains on
two segments of historically
problematic pipelines. These were
removed from the high-frequency
cleaning list.
The City replaced sewer mains on two
segments of historically problematic
pipelines. These were removed from the
high-frequency cleaning list.
The City replaced sewer mains on two
segments of historically problematic
pipelines. These were removed from the
high-frequency cleaning list.
Reducing Fats, Oils, and Grease (FOG)
backups and spills.
Increasing inspection frequency for food
service establishments
Conducting preventative maintenance at
each sewer lift station on an annual basis.
Annual preventative lift station maintenance
was conducted consistent with the
scheduled frequency.
Replacing critical septic system
components at 112 Stonegate Village
services every three years.
The replacement frequency was changed to
every two years to improve reliability of the
pumping systems.
5 Sanitary Sewer Spills
During the 3-year audit period, the City had two Sanitary Sewer Spills on City-operated sewer lines.
Yuba City CS Stonegate CS
Date 5/28/23 9/23/21
Spill Category 1 3
Estimated Total Spill Volume
to Reach Surface Water (gal)
285 0
Estimated Spill Volume to
Reach Land (gal)
0 10
Estimated Spill Volume
Recovered (gal)
150 0
Estimated Total Spill Volume
(gal)
435 10
Cause Root intrusion into main Pump station failure
Following the May 2023 spill caused by root intrusion, the line segment serving the affected service was added to the chemical root intrusion program.
SSMP Audit Checklist
A list of audit requirements, an assessment of City compliance, and recommendations for improvement are included in the following SSMP Audit Checklist.
City of Yuba City
SSMP Audit Checklist
1 City of Yuba City
Sewer System Management Plan
May 2023
Audit Date: January 28, 2025
Audit Period: August 3, 2021 – August 2, 2024
Audit Team Members: Katherine Willis, Eduardo Ramirez, Mandy Barker, Julian Singh, Lain Asher, Edgar Ramirez
Note: The General Order requires that audits be conducted every three years, at minimum Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
1 Goals
The goal of the SSMP is to provide a plan and schedule to properly manage, operate, and maintain all parts of the sanitary sewer system.
2 Organization
The SSMP must identify:
(a) The name of the responsible or
authorized representative
Yes/N
o
Current LRO is
Benjamin Moody
and Data
Submitters are
Eduardo Ramirez
and Katherine
Willis.
Update in August 2025
SSMP Update.
(b) The names and telephone numbers
for management, administrative, and
maintenance positions responsible for
implementing specific measures in
the SSMP program. The SSMP must
identify lines of authority through an
organization chart or similar
document with a narrative explanation
Yes/N
o
Need to update
tables and
organizational
chart.
Update in August 2025
SSMP Update.
City of Yuba City
SSMP Audit Checklist
2 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(c) The chain of communication for
reporting SSSs, from receipt of a
complaint or other information,
including the person responsible for
reporting SSSs to the State and
Regional Water Board and other
agencies if applicable
Yes Chart is still
current
3 Legal Authority
Each Enrollee must demonstrate, through sanitary sewer system use ordinances, service agreements, or other legally binding procedures, that it possesses the necessary legal authority to:
(a) Prevent illicit discharges into its
sanitary sewer system
Yes Municipal Code
references
reviewed by City
Staff and
determined to
meet
requirements.
(b) Require that sewers and connections
be properly designed and constructed
Yes Municipal Code
references
reviewed by City
Staff and
determined to
meet
requirements.
(c) Ensure access for maintenance,
inspection, or repairs for portions of
the lateral owned or maintained by
the Public Agency
Yes Municipal Code
references
reviewed by City
Staff and
determined to
meet
requirements.
City of Yuba City
SSMP Audit Checklist
3 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(d) Limit the discharge of fats, oils, and
grease and other debris that may
cause blockages
Yes Municipal Code
references
reviewed by City
Staff and
determined to
meet
requirements.
(e) Enforce any violation of its sewer
ordinances
Yes Municipal Code
references
reviewed by City
Staff and
determined to
meet
requirements.
4 O&M Program
The SSMP must include those elements listed below that are appropriate and applicable to the Enrollee’s system:
(a) Maintain an up-to-date map of the
sanitary sewer system, showing all
gravity line segments and manholes,
pumping facilities, pressure pipes and
valves, and applicable stormwater
conveyance facilities
No - Update sanitary
sewer system
maps.
- Develop system
for recording
unmapped line
segments
- City hired a consultant to
begin updating GIS maps in
FY 2024/25.
- Recommending continuing
updating maps over time.
(b) Describe routine preventive operation
and maintenance activities by staff
and contractors, including a system
for scheduling regular maintenance
and cleaning of the sanitary sewer
system with more frequent cleaning
and maintenance targeted at known
problem areas. The Preventative
Maintenance (PM) program should
have a system to document
scheduled and conducted activities,
such as work orders
Yes PM work order
tracking has
improved
significantly over
3-year audit
period by using
facility
identification
numbers for work
orders and
checking
consistency of
documentation of
PM activities.
Standard Operating
Procedures (SOPs) and
Emergency Response
Plans (ERPs) should be
created for the City’s lift
stations.
City of Yuba City
SSMP Audit Checklist
4 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(c) Develop a rehabilitation and
replacement plan to identify and
prioritize system deficiencies and
implement short-term and long-term
rehabilitation actions to address each
deficiency. The program should
include regular visual and TV
inspections of manholes and sewer
pipes, and a system for ranking the
condition of sewer pipes and
scheduling rehabilitation.
Rehabilitation and replacement
should focus on sewer pipes that are
at risk of collapse or prone to more
frequent blockages due to pipe
defects.
Yes The Wastewater
Master Plan
provides the
foundation for
prioritizing
funding needed
to repair and
maintain the
City’s
infrastructure.
Results of regular
visual and TV
inspections are
used to refine
prioritization.
Continue efforts to achieve
SSMP goals of sewer jetting
collection system sewer on
a 3-year cycle and
conducting TV inspections
on a 5-year cycle.
The rehabilitation and replacement
plan should include a capital
improvement plan that addresses
proper management and protection of
the infrastructure assets. The plan
shall include a time schedule for
implementing the short- and longterm plans plus a schedule for developing the funds needed for the
capital improvement plan
Yes The capital
improvement
plan in the
Wastewater
Master Plan
includes timelines
and funding
plans for longterm protection of
infrastructure
assets.
Update the priorities
identified Wastewater
Master Plan based system
conditions and anticipated
development.
(d) Provide training on a regular basis for
staff in sanitary sewer system
operations and maintenance, and
require contractors to be
appropriately trained
Yes Staff training
program is in
place, and
training occurs
on a regular
schedule.
Increase training related to
Sanitary Sewer Spill
response plan.
City of Yuba City
SSMP Audit Checklist
5 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(e) Provide equipment and replacement
part inventories, including
identification of critical replacement
parts
Yes Equipment and
replacement part
inventories are
maintained and
critical
replacement
parts inventories
have been
maintained at or
above minimum
desired levels.
5 Design and Performance Provisions
(a) Design and construction standards
and specifications for the installation
of new sanitary sewer systems, pump
stations and other appurtenances;
and for the rehabilitation and repair of
existing sanitary sewer systems
Yes Design and
construction
standards and
specifications
verified by
Engineering
Department as
meeting WDR
requirements.
(b) Procedures and standards for
inspecting and testing the installation
of new sewers, pumps, and other
appurtenances and for rehabilitation
and repair projects
Yes Design and
construction
standards and
specifications
verified by
Engineering
Department as
meeting WDR
requirements.
6 Spill Emergency Response Plan (SERP)
Each Enrollee shall develop and implement an overflow emergency response plan that identifies measures to protect public health and the environment. At a minimum, this plan must include the following:
City of Yuba City
SSMP Audit Checklist
6 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(a) Proper notification procedures so that
the primary responders and
regulatory agencies are informed of
all SSSs in a timely manner
Yes A consultant
assisted City staff
in development
of the SERP to
meet the 2022
General Order
guidelines for
developing
SSMPs and
SERPs. These
plans include the
appropriate spill
response and
notification
procedures.
(b) A program to ensure an appropriate
response to all overflows
Yes A consultant
assisted City staff
in development
of the SERP to
meet the 2022
General Order
guidelines for
developing
SSMPs and
SERPs. These
plans include the
appropriate spill
response and
notification
procedures.
City of Yuba City
SSMP Audit Checklist
7 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(c) Procedures to ensure prompt
notification to appropriate regulatory
agencies and other potentially
affected entities (e.g., health
agencies, Regional Water Boards,
water suppliers, etc.) of all SSSs that
potentially affect public health or
reach the waters of the State in
accordance with the MRP. All SSSs
shall be reported in accordance with
this MRP, the California Water Code,
other State Law, and other applicable
Regional Water Board WDRs or
NPDES permit requirements. The
SSMP should identify the officials
who will receive immediate
notification
Yes A consultant
assisted City staff
in development
of the SERP to
meet the 2022
General Order
guidelines for
developing
SSMPs and
SERPs. These
plans include the
appropriate spill
response and
notification
procedures.
(d) Procedure to ensure City staff are
aware of, are trained, and follow
SERP
Yes Collections staff
are aware and
trained to follow
the SERP.
Since there have been very
few actual spills, additional
training in spill volume
assessment and spill
response is recommended.
(e) Procedures to ensure that appropriate
staff and contractor personnel are
aware of and follow the SERP and
are appropriately trained
Yes Collections staff
are aware of and
trained to follow
the SERP.
Additional training is
recommended.
(f) Procedures to address emergency
operations, such as traffic and crowd
control and other necessary response
activities
Yes City staff are
trained in
procedures to
address
emergency
operations.
City of Yuba City
SSMP Audit Checklist
8 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(g) A program to ensure that all
reasonable steps are taken to contain
and prevent the discharge of
untreated and partially treated
wastewater to waters of the United
States and to minimize or correct any
adverse impact on the environment
resulting from the SSSs, including
such accelerated or additional
monitoring as may be necessary to
determine the nature and impact of
the discharge
Yes A consultant
assisted City staff
in development
of the SERP to
meet the 2022
General Order
guidelines for
developing
SSMPs and
SERPs. These
plans include the
appropriate spill
response and
notification
procedures.
7 FOG Control Program
Each Enrollee shall evaluate its service area to determine whether a FOG control program is needed. If an Enrollee determines that a FOG program is not needed, the Enrollee must provide justification for why it is not needed. If FOG is found to be a problem, the Enrollee must prepare and implement a FOG source control program to reduce the amount of these substances discharged to the sanitary sewer system. This plan shall include the following as appropriate:
(a) An implementation plan and schedule
for a public education outreach
program that promotes proper
disposal of FOG
Yes Public education
and outreach
includes posting
videos on social
media and
attending the
Yuba Sutter
County Fair,
where staff hand
out educational
brochures and
promotional
items.
City of Yuba City
SSMP Audit Checklist
9 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(b) A plan and schedule for the disposal
of FOG generated within the sanitary
sewer system service area. This may
include a list of acceptable disposal
facilities and/or additional facilities
needed to adequately dispose of
FOG generated within a sanitary
sewer system service area
Yes Grease removed
from the
collection system
is disposed of at
the City’s
wastewater
treatment facility.
FOG generated
by FSEs is
collected in
grease
interceptors or
grease traps and
is maintained by
the FSEs.
(c) The legal authority to prohibit
discharges to the system and identify
measures to prevent SSSs and
blockages caused by FOG
Yes The City’s Sewer
Use Ordinance
gives the City the
legal authority to
enforce the City’s
FOG program.
Section 6-
5.1202.b states:
“No FSE shall
discharge FOG
or cause FOG to
be discharged
into the public
sewer that
causes an SSO,
exceeds a
concentration
level set forth in
Section 6-5.208,
or that may
accumulate
and/or cause or
contribute to
blockages in the
public sewer.”
City of Yuba City
SSMP Audit Checklist
10 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(d) Requirements to install grease
removal devices (such as traps or
interceptors), design standards for the
removal devices, maintenance
requirements, BMP requirements,
record keeping and reporting
requirements
Yes The City’s most
recent Sewer
Use Ordinance
adopted by the
City Council on
January 18,
2022, requires
the installation of
grease
interceptors or
grease traps,
design standards
as set forth in the
most recent
California
Plumbing Code,
maintenance
requirements,
best
management
requirements,
and reporting
requirements.
(e) Authority to inspect grease producing
facilities, enforcement authorities, and
whether the Enrollee has sufficient
staff to inspect and enforce the FOG
ordinance
Yes The City’s Sewer
Use Ordinance
gives the City the
legal authority to
enforce the City’s
FOG program.
City of Yuba City
SSMP Audit Checklist
11 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(f) An identification of sanitary sewer
system sections subject to FOG
blockages and establishment of a
cleaning maintenance schedule for
each section
Yes The Sewer
Collections staff
has identified
sections of the
system subject to
FOG blockages
and conducts
maintenance on
a schedule
adjusted to
prevent SSSs.
(g) Development and implementation of
source control measures for all
sources of FOG discharged to the
sanitary sewer system for each
section identified in (f) above
Yes The City FOG
inspector works
with commercial
establishments to
minimize the
entry of FOG into
the collection
system, and City
staff conduct
outreach to
residents to
minimize the
entry of FOG into
the system from
residential
customers.
8 System Evaluation and Capacity Assurance Plan
The Enrollee shall prepare and implement a capital improvement plan (CIP) that will provide hydraulic capacity of key sanitary sewer system elements for dry weather peak flow conditions, as well as the appropriate design storm or wet weather event. At a minimum, the plan must include:
City of Yuba City
SSMP Audit Checklist
12 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(a) Evaluation: Actions needed to
evaluate those portions of the
sanitary sewer system that are
experiencing or contributing to an
SSS discharge caused by hydraulic
deficiency. The evaluation must
provide estimates of peak flows
(including flows from SSSs that
escape from the system) associated
with conditions similar to those
causing overflow events, estimates of
the capacity of key system
components, hydraulic deficiencies
(including components of the system
with limiting capacity) and the major
sources that contribute to the peak
flows associated with overflow events
Yes The City’s 2020
Wastewater
Master Plan
modeled trunk
sewer lines that
were 12” in
diameter or
larger, and some
small diameter
gravity mains as
well.
In FY 24/25, City
contracted with
the consulting
firm that
developed the
master plan to
update the
hydraulic model
upon which the
Wastewater
Master Plan was
developed.
The hydraulic model update
is anticipated to be
complete in 2025.
(b) Design Criteria: Where design criteria
do not exist or are deficient,
undertake the evaluation identified in
(a) above to establish appropriate
design criteria
Yes Results of the
hydraulic
modeling will be
used to
determine the
need for updating
design criteria.
City of Yuba City
SSMP Audit Checklist
13 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(c) Capacity Enhancement Measures:
The steps needed to establish a
short- and long-term CIP to address
identified hydraulic deficiencies,
including prioritization, alternatives
analysis, and schedules. The CIP
may include increases in pipe size, I/I
reduction programs, increases and
redundancy in pumping capacity, and
storage facilities. The CIP shall
include an implementation schedule
and shall identify sources of funding.
Yes Results of the
hydraulic
modeling will be
used to
determine the
need for updating
design criteria.
Results of
condition
assessments will
be used to inform
recommended
CIP priorities.
(d) Schedule: The Enrollee shall develop
a schedule of completion dates for all
portions of the capital improvement
program developed in (a)-(c) above.
This schedule shall be reviewed and
updated consistent with the SSMP
review and update requirements as
described in Section D. 14.
Yes The Wastewater
Master Plan
includes lists of
projects for nearterm and buildout
CIP projects for
trunk main and
lift station
projects. These
projects were
prioritized in 1-5
year, 6-10 year,
and 11-20 year.
City staff reviews the
projects recommended in
the Wastewater Master
Plan each year as part of
the budget planning
process.
9 Monitoring, Measurement, and Program Modifications
The Enrollee shall:
(a) Maintain relevant information that can
be used to establish and prioritize
appropriate SSMP activities
Yes The City’s work
order tracking
system is used to
document and
prioritize SSMP
activities.
City of Yuba City
SSMP Audit Checklist
14 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
(b) Monitor the implementation and,
where appropriate, measure the
effectiveness of each element of the
SSMP
Yes
(c) Assess the success of the
preventative maintenance program
Yes A key measure of
success of the
preventative
maintenance
program is the
occurrence of
only two SSS
events in the
three-year period
of this audit.
(d) Update program elements, as
appropriate, based on monitoring or
performance evaluations; and
Yes
(e) Identify and illustrate SSS trends,
including: frequency, location, and
volume
Yes
10 SSMP Program Audits
As part of the SSMP, the Enrollee shall conduct periodic internal audits, appropriate to the size of the system and the number of SSSs. At a minimum, these audits must occur every two years and a report must be prepared and kept on file. This audit shall focus on evaluating the effectiveness of the SSMP and the Enrollee’s compliance with the SSMP requirements including identification of any deficiencies in the SSMP and steps to correct them 11 Communications Program
The Enrollee shall communicate on a
regular basis with the public on the
development, implementation, and
performance of its SSMP. The
communication system shall provide
the public the opportunity to provide
input to the Enrollee as the program
is developed and implemented
Yes The City Council
adopted the 2023
SSMP Update at
a public meeting
held on May 16,
2023.
The City Council will be
scheduled to adopt a 2025
SSMP Update in July 2025
City of Yuba City
SSMP Audit Checklist
15 City of Yuba City
Sewer System Management Plan
May 2023
Section Title Requirement
Compl
iant
with
Order
(Yes /
No)
Audit Compliance
Notes
Follow-Through
Implementations
Scheduled Improvement Date
The Enrollee shall also create a plan
of communication with systems that
are tributary and/or satellite to the
Enrollee’s sanitary sewer system
NA
Agenda Item 7
CITY OF YUBA CITY
STAFF REPORT
Date: July 1, 2025
To: Honorable Mayor & Members of the City Council;
From: Public Works
Presentation By: Joshua Wolffe, Senior Engineer
Summary
Subject: Yuba City Landscape District No. 1 - Resolution of Intent Recommendation: A. Adopt the following Resolutions to continue the Maintenance Districts pursuant to the Landscaping and Lighting Act of 1972:
• Resolution Approving Engineer's Reports Yuba City Landscape Maintenance District No.1
• Resolution of Intention to Levy and Collect Assessments, Yuba City Landscape Maintenance District No.1
B. Set a Public Hearing for July 15, 2025 at 6:00PM to establish assessments for Fiscal Year (FY) 2025-26
Fiscal Impact: Receipt of assessments and expenditure of funds for lighting and landscape maintenance districts throughout the City.
Purpose:
To continue to provide lighting and landscape maintenance throughout the City pursuant to the provisions of the Landscaping and Lighting Act of 1972 and Article XIIID of the California Constitution.
Council Strategic Goal:
Levying Yuba City Landscape Maintenance District No. 1 (LLMD 1) addresses the City Council's Strategic Goal of maintaining infrastructure, as levying LLMD No. 1 will ensure that landscaping, and other items included in the District are maintained and in operation.
Background:
The City annually levies and collects special assessments in order to maintain and service landscaping and lighting improvements that provide special benefit to the parcels identified in LLMD 1. The assessments were approved by the property owners of record through a protest-ballot proceeding at the time the Districts were formed.
LLMD 1 includes the Stabler Lane area (Zone of Benefit A) and Garden Highway Area (Zones of Benefit B, B_1, and B_2). Zones of Benefit A and B do not have provisions for a cost of living
adjustment (COLA) and have historically been charged the maximum levy allowed in order to cover their annual expenses. Zones B_1 and B_2 are recently formed zones of benefit and do have provisions for a COLA which is based on the Consumer Price Index from January to January.
Analysis:
The Engineer's Annual Report has been prepared and is on file in the City Clerk's office. It describes each District, the improvements therein, the method of assessment and the proposed assessment for each parcel. The Resolution of Intention to levy and collect assessment is required by state law for existing districts. The proposed action in this report sets a public hearing for the Council meeting to be held on July 15, 2025 to establish assessments for the coming year.
District No. 1, Zones of Benefit B_1 and B_2 will see increases in their annual levies. The levies were raised in response to inflation. District No. 1 Zones of Benefit A and B will continue to be levied at the maximum amount, and will not be increased further due to their lack of COLAs.
Fiscal Impact:
The proposed assessments for FY 2025-26 are shown in Attachment 3.
The projected revenue, expenditures, and cash balance, which include capital reserve for the Districts, are as follows:
District Revenue Expenditures Projected Reserve Fund Balance as of 07/01/2026*
1A $22,007.36 $22,022.90 ($4,138.83)
1B** $65,802.70 $66,385.20 ($5,205.80)
*The Projected Reserve Fund Balance is the total of the Capital Replacement Reserve plus the Operating Reserve.
**Dollar amounts for Zones of Benefit B, B_1 and B_2 are included within the "1B" row of the table.
District 1 was formed in 1990 with no COLA, therefore the District's funding is annually based on 1990 dollars. This means that in District 1, Zone of Benefit A, each parcel pays $56.72 annually; and in Zone of Benefit B, each parcel pays $29.50 annually. Staff has reduced maintenance in District 1 to minimal levels in attempts to keep the District's balance positive. With increases in maintenance, water, and electrical costs, it has become increasingly difficult to provide minimally acceptable maintenance. If the Zones of Benefits' rates were inflated to 2025 dollars, the annual amounts per parcel would be $141.33 and $73.50, respectively. The current average annual per-parcel rate among all other residential LLMDs in the City is approximately $200.
Moving forward, staff will need to continue with reducing services in these Zones of Benefit due to lack of funding. In order to correct the funding issues, and re-establish great aesthetics through higher levels of maintenance, staff may conduct a Proposition 218 hearing to modify the District for inclusion of COLAs.
Alternatives:
1. Council may direct City staff to follow legal procedures in order to modify District No. 1, increasing assessment amounts to a level appropriate for maintenance, and including a Cost of Living Adjustment.
2. Council may cancel the district and find alternative funding sources to maintain the landscaping and related items in this area.
Recommendation:
A. Adopt the following Resolutions to continue the Maintenance Districts pursuant to the Landscaping and Lighting Act of 1972:
• Resolution Approving Engineer's Reports Yuba City Landscape Maintenance District No.1 • Resolution of Intention to Levy and Collect Assessments, Yuba City Landscape Maintenance District No.1
B. Set a Public Hearing for July 15, 2025 at 6:00PM to establish assessments for Fiscal Year (FY) 2025-26
Attachments:
1. Attachment 1 - Resolution LLMD 1 Approve Engineer's Report
2. Attachment 2 - Resolution LLMD 1 Set Public Hearing Date
3. Exhibit A - District Maps LLMD 1
4. Attachment 3 - Proposed Assessments
5. Attachment 4 - Engineer's Reports
Prepared By: Submitted By:
Josh Wolffe
Senior Civil Engineer
Robert Bendorf
Interim City Manager
ATTACHMENT 1
RESOLUTION NO. _________
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF YUBA CITY APPROVING THE ENGINEER’S REPORT FOR THE YUBA CITY
LANDSCAPE MAINTENANCE DISTRICT NO. 1 (STABLER LANE/GARDEN
HIGHWAY AREA)
WHEREAS, the City Council of the City of Yuba City previously formed Landscape Maintenance District No. 1, (“District”), pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code (commencing with Section 22500) (the “Act”); and
WHEREAS, on June 17, 2025, pursuant to the provisions of the Act, the City Council initiated proceedings by adopting a Resolution describing improvements and ordering the City Engineer to file a report with regard to the District for the 2025-26 Fiscal Year; and WHEREAS, the City Engineer has prepared and filed the written report with the City Clerk entitled “City of Yuba City, Landscape Maintenance District No. 1, Zone of Benefit A, Zone of Benefit B, Zone of Benefit B_1, Zone of Benefit B_2, 2025/2026 Engineer’s Annual Levy Report” (the “Engineer's Report”) as called for in said Resolution and under and pursuant to said Act, which report has been presented to this City Council for consideration; and WHEREAS, said City Council has duly considered said Engineer’s Report and each and every part thereof, and finds that each and every part of said reports are sufficient, and that no portion of the reports require or should be modified in any respect.
WHEREAS, the City Council desires to formally approve the Engineer’s Report, as filed, pursuant to Section 22623 of the Act.
NOW, THEREFORE, be it resolved by the City Council of the City of Yuba City as follows:
1. The above recitals are true and correct, and are hereby incorporated herein by this reference.
2. The City Council finds that the Engineer’s estimates prepared by the City Engineer of the itemized costs and expenses of said work and of the incidental expenses in connection therewith, contained in said Engineer’s Report be, and each of them are hereby, preliminarily approved and confirmed.
3. The City Council finds that the diagram showing the District referred to and described in said Engineer’s Report, the boundaries of the subdivisions of the land within said District, is the same as existed at the time of passage of said Resolution and is hereby preliminarily approved and confirmed.
4. The City Council finds that the proposed assessments upon the subdivisions of land in said Districts are in proportion to the estimated benefit to be received by said subdivisions, respectively, from the work and incidental expenses as contained and detailed in the Engineer’s Report, which is hereby preliminarily approved and confirmed.
5. The City Council hereby approves the “City of Yuba City, Landscape Maintenance District No. 1, Zone of Benefit A, Zone of Benefit B, Zone of Benefit B_1, Zone of Benefit B_2, 2025/2026 Engineer’s Annual Levy Report.” Said report shall serve as the Engineer’s Report for the purposes of subsequent proceedings for Landscape Maintenance District No. 1.
6. This Resolution shall take effect immediately.
The foregoing Resolution was duly and regularly introduced, passed, and adopted by the City Council of the City of Yuba City at a regular meeting thereof held on the 1st day of July, 2025.
AYES:
NOES:
ABSENT:
Dave Shaw, Mayor
ATTEST:
Ciara Wakefield, City Clerk
APPROVED AS TO FORM
COUNSEL FOR YUBA CITY
Shannon L. Chaffin, City Attorney
Aleshire & Wynder, LLP
ATTACHMENT 2
RESOLUTION NO. _________
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF YUBA CITY
DECLARING ITS INTENTION TO LEVY AND COLLECT ASSESSMENTS WITHIN YUBA CITY LANDSCAPE MAINTENANCE DISTRICT NO. 1
(STABLER LANE/GARDEN HIGHWAY AREA) PURSUANT TO THE
LANDSCAPING AND LIGHTING ACT OF 1972, PART 2 OF DIVISION 15 OF
THE CALIFORNIA STREETS AND HIGHWAYS CODE, AND APPOINTING A
TIME AND PLACE FOR HEARING OBJECTIONS THERETO
WHEREAS, the City of Yuba City is a municipal corporation duly created and existing pursuant to the Constitution and laws of the State of California; and WHEREAS, the Landscaping and Lighting Act of 1972 (“Act”) requires the review of annual assessment of existing Districts; and
WHEREAS, the City Council of the City of Yuba City previously formed Yuba City Landscape Maintenance District No. 1 (“District”), pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code (commencing with Section 22500) (the “Act”); and
WHEREAS, assessments levied within the District provide revenue for the purposes of the servicing, operation, maintenance, repair, and replacement of designated turf, ground cover, shrubs, trees, plants, irrigation and drainage systems, ornamental lighting structures, masonry walls or other fencing, entryway monuments, and associated appurtenant facilities located within the streetscape (perimeter landscaping) surrounding the developments; and WHEREAS, on June 17, 2025, pursuant to the provisions of the Act, the City Council initiated proceedings by adopting a Resolution describing improvements and ordering the City Engineer to file a report with regard to the Districts for the 2025-2026 Fiscal Year; and WHEREAS, in accordance with Article 4 of Chapter 1 of the Act, the Engineer prepared and filed such report (the “Engineer’s Report”) with the City Clerk, and the City Clerk has presented the Engineer’s Reports to the City Council; and
WHEREAS, on July 1, 2025, the City Council adopted a Resolution approving the Engineer’s Reports as filed, pursuant to Section 22623 of the Act; and WHEREAS, in accordance with Section 22624 of the Act, the City Council now desires to declare its intention to levy and collect the assessments within the Districts for Fiscal Year 2025-26, and to call a public hearing thereto.
NOW, THEREFORE, be it resolved by the City Council of Yuba City as follows:
1. The above recitals are true and correct, and are hereby incorporated herein by this reference.
2. The City Council hereby (1) finds that the public interest and convenience requires, and (2) declares its intention to order, the levy of and collection of assessments against the assessable lots and parcels of property within an existing assessment district designated Yuba City Landscape Maintenance District No. 1 (“District”), pursuant to the provisions of the Act, for the fiscal year commencing July 1, 2025 and ending June 30, 2026, to pay for the costs and expenses of the improvements described below in Section 4 of this Resolution.
3. The boundaries of the District are generally located and depicted in “Exhibit A” attached hereto.
4. The proposed improvements are briefly described as follows: the servicing, operation, maintenance, repair, and replacement of, designated turf, ground cover, shrubs, trees, plants, irrigation and drainage systems, ornamental lighting structures, masonry walls or other fencing, entryway monuments, and associated appurtenant facilities located within the streetscape (perimeter landscaping) surrounding the developments.
5. The assessments to be levied and collected against the assessable lots and parcels of property within the District for Fiscal Year 2025-26 are proposed to be modified as follows: Assessments for District No.1 Zones of benefit B_1 and B_2, for Fiscal Year 2025-26 are proposed to increase from the previous year as described in the Engineer’s Report, but are still within or less than the amount approved for said District at the time of the Districts’ respective formations. The assessments for District No. 1 Zones of Benefit A and B are proposed to stay the same as the previous Fiscal Year.
6. By previous resolution, the City Council directed the City Engineer to prepare and to file the Engineer’s Report pursuant to the provisions of the Act. The Engineer has prepared and filed the written report with the City Clerk that is titled “City of Yuba City, Landscape Maintenance District No. 1, Zone of Benefit A, Zone of Benefit B, Zone of Benefit B_1, Zone of Benefit B_2, 2025/2026 Engineer’s Annual Levy Report,” and by previous resolution the City Council approved the Engineer’s Report as filed. Reference is made to the Engineer’s Report on file in the Office of the City Clerk and open to public inspection for a full and detailed description of the improvements, the boundaries of the District, and the proposed assessments upon assessable lots and parcels of land within the District. The Office of the City Clerk is located at 1201 Civic Center Boulevard, Yuba City, CA 95993.
7. Notice is hereby given that the City Council designates July 15, 2025 at 6:00 p.m., in the City Council Chambers, City Hall, 1201 Civic Center Boulevard, Yuba City, CA, as the date, time, and place for the hearing of protests or objections to the levy of the proposed assessments in connection with the Districts. All interested persons shall be afforded the opportunity to hear and be heard. The City Council shall consider all oral statements and all written protests or communications made or filed by any interested person. Prior to the conclusion of the hearing, any interested person may file a written protest with the City Clerk or, having previously
filed a protest, may file a written withdrawal of that protest. A written protest shall state all grounds of objection. A protest by a property owner shall contain a description sufficient to identify the property owned by the signer. Written protests may be delivered in person to the City Clerk or may be mailed to the City Clerk at City Hall, 1201 Civic Center Boulevard, Yuba City, CA 95993. Any written protest that is mailed must be received at City Hall at or prior to 4:30 p.m. on July 15, 2025
8. The City Clerk shall give notice of the aforesaid date, time, and place of the hearing in accordance with law.
The foregoing Resolution was duly and regularly introduced, passed, and adopted by the City Council of the City of Yuba City at a regular meeting thereof held on the 1st day of July 2025.
AYES:
NOES:
ABSENT:
Dave Shaw, Mayor
ATTEST:
Ciara Wakefield, City Clerk
APPROVED AS TO FORM
COUNSEL FOR YUBA CITY
Shannon L. Chaffin, City Attorney
Aleshire & Wynder, LLP
Attachment(s):
Exhibit A – District Maps
EXHIBIT A
QUEENS AVE
FLORAIN DR
GA RD ENS ID E WAY
DOROTHY LN
BUTTE VISTA LN
SARATOGA CT
SPRIG CT
HAWK CT
MYKONOS CT
STABLER PARK DR
OAKBROOK CT
ROBIN CT
TUMBER WAY
MONTCLAIR DR
EL VERANO WAY
PORTOFINO DR
ELVERANDACT
JAMIE DR
ELSOBRANTECT
TRES PICOS DR
SANTA BARBARA WAY
MANCHESTER WAY
LANCASTER WAY
OSPREY CT
VINTAGE CT
PINTAIL CT
SANTORINI CT
CORSICA DR
TORTOSA CT
DOVE CT
ELDORADOLN
QUAIL CT
RACHEL CT
NORTHF ELD CT I
SYLVIA WAY
OAKBROOK DR
QUEENS AVE SB 99 ON
HWY 99
MALAGA CT
LORA WAY
99 NB QUEENS AVE OFF
DEBBIE LN
ESPLANADE WAY
BR SI TOL CT
ELIZABETH LN
EDEN WAY
PHEASANT DR
SEVILLA CT
JENNIFER LN
DANA WAY
PEACH TREE LN
EMILY LN
PATTY DR
GROUSE WAY
BR ADLEY ESTATES DR
NADEAN DR
LA PALMA
EL CERRITO CT
JENNIFER CT
YORK DR
NANCY CT
LA CRESENTA CT
RICH LN
MICHAEL WAY
PROVENCE DR
VALLEY VIEW DR
BROOKFIELD CT CUMMINGS CT
MALTA DR
COLIN CT
CHRISTIFER LN
CANDACE CT
KENDALL CT
BAL CT
DIJON CT
MC MULLEN AVE
KENNY DR
SHAY WAY
CASA LOMA WAY
CASITA DR
LA COLINA LN
MELTON DR
LORRAINE WAY
MICH CT
NORTHWOODS DR
FORESTWOOD DR
CLAIRE CT
WOODLAND DR
NORTH RIDGE DR
CAMDEN WAY
NORTHGATEDR
WARD CT
CLYDE WAY
ROLLING ROCK CT
GENOA CT
CHLOE CT
CALAIS DR
TURIN DR
MEHAR CT
RAVI CT
SUKH DR
PABLA CT
VALLEY CT
COATS DR
GRANADA WAY
PARC EAST DR
BUTTE BEND LN
PAULA DR
HUNTER WAY
PAM DR
SPENCER LN
SHARON DR
REBECCA DR
99 SB QUEENS AVE OFF
QUEENS AVE 99 NB ON
STABLER LN
MESSINA DR
E ONSTOTT FRTG RD
CARTAGENA DR
PARC WEST DR
MESSINA CT
REGENCY WAY
CAPRI DR
GR EENWOOD WAY
MANN DR
SOMERSET WAY
NORTHFIELD DR
HERBERT CT
W ONSTOTT FRTG RD
MAJORCA DR
MEADOWLARK WAY
1A
Lighting & Landscape
Maintenance District No. 1
Zones of Benefit
QUEENS AVE
S WALTON AVE
THARPRD
BUTTE HOUSE RD
FRANKLIN AVE
SUNSWEET BLVD
PLUMAS ST
RICHLAND RD
LINCOLN RD
HARTER PKWY
HOOPER RD
STEWART RD
L VI E OAKBLVD
RAILROAD AVE
BRIDGE ST
S GEORGE WASH NI GTON BLVD
LINCOLN RD
FRANKLIN RD
BOGUE RD
BUNCE RD
OHLEYER RD
TIERRA BUENA RD
GRAY AVE
CLARK AVE
GARDEN HWY
Highway 20
Highway 99
8 Legend
Maintenance Districts μ City Limits
1B
1B
1B_1
1B_1
1B_2
BUNCE RD
GARDEN HWY
JONES RD
S BARRETT RD
RAILROAD AVE
RANDOLPH DR
LINCOLN RD
BOGUE RD
RICHLAND RD
WINSHIP RD
CRESTMONT AVE
SINGH'S WAY
WHISTLEW OO D CT
B RENTW OOD DR
KILLINGTON CT
CORNWELL AVE
M E A DO W A V E
WALLACE DR
MILL CREEK WAY
TEESDALE RD
GR OV E CT
GOLD RIVER DR
HASTINGS WAY
ALMOND GROVE DR
STONYB ROOK DR
MARINER LOOP
SHANGHAI BEND RD
DEL LAGO
CAR ISSA C T
MAIN ST
MA RG AR ET C T
PAYNECT
SOUTHLAND DR
ASH WO OD CT
PH LI LIPS RD
W NI S H PI C T
ALDE RWO O D C T
TA RA CT
JILL CT
STEWART RD
JAN C T
ATLANT IC CT
WILD RIVER DR
EUREKA DR
S TO NYB RO OK CT
CR ESWE LLD R
DORCAS CT
MAGNOLIA DR
SOUTH PARK DR LA GRANDE AVE
RIVER OAKS DR
REO DR
MILLFRONT AVE
MARINER W AY
VILLAGE CT
BLA CK CT
BUCK RIVERTS
WAVERLY CT
DEE BEERSCT
COLONY CT
HAVE N CT
TRINITY AVE
SM ITH RD
CAMBRIDG ECT
DIAMOND POINTE WAY
WINDSOR DR
TULSA C T
BU RL CT
MARIPOSA DR
WOODHAVEN DR
ROCKY CT
KATHERINE CT
RHINE CT
WIND RIVE R CT
GEE BEE WAY
ALBATROSS AVE
SO UTHWIND DR
COLD WATER ST
STILLWATER DR
STONEWATER DR
TIMBER CT
ROYAL RIVER DR
MARIAH DR
ARBOR WAY
RAPID WATE R WAY
BUNCE CT
DAKOTACT
GER ALD CT
NEBRASKA DR
TRUCKEE CT
FRANQUETTE DR
ME AD OW W ALK D R
JEFFREY DR
ARIZONA WAY
STARLITE LN
CANTERBURY DR
M ONTA NA C T
ANDREW DR
LASK DR
BLUE OAK DR
HOMEWOOD DR
CRES CENT CT
LOIS LN
ARI CT
CARMELO WAY
OREGON WAY
CIRCASSIAN DR
TWINS WAY
GILL LI AND DR
PECAN DR
KELSEY C T
LONELY OAK DR
AURORA DR
COTTON ROSSER WAY
DELONE DR
STEPHEN WAY
DRUMMOND DR
OLEANDER DR
BARON CT
SCIROCCO DR
SHADY CT
TWIN RIVERS DR
PEORIA DR
BRA NDON ST
ATLANT SI WAY NEPTUNE DR CRYSTAL CRE EK LN
TRADEWIND DR
SOUTHPOINTE DR
SH ER MAN CT
CORBY CT
GALAXY DR
CALAVERAS CT
TULSA DR
DOLPHIN CT
MARLIN CT
PACIF CI A DR
NAUTILUS CT
RADDISON DR
VOBORIL AVE
ASHLEY WAY
DENNIS WAY
COLUMB AI DR
GLE N W O OD DR
RICKEY DR
SW IFT CREEK CT
OAK CT
NAURA CT
WHITE ROCK DR
SECOND ST
CLARO CT
W HISPE RING O AK S CT
FALLING ROC K CT
SUNWESTD R
MAYETTE CT
CECILY CT
BIG OAKS CT
MORRISON BEND
TEAL CT
HAMSTEADLN
EMERALD DR
CARR DR
TIFFANY WAY
MURRAY CT
SHELBY CT ZEPHYR DR
CRESTMONTCT
WISCONSIN CT
SPRING CREEK CT
EL VALLAS CIR
QUEENSBURY WAY
MUIR RD
CAM NI ITO AVE
WHITE OAK DR
SHADY LN
HIGHLAND AVE
NOTTINGHAM WAY
LOS BRAVOSDR
RAPID FALLS DR
HARTLEY WAY
SLEEPY DR
TEESDALE CT
SAM RIDER WAY
JOHN WAYNE DR
MICHIGAN CT
UTAH CT
SCOTTEN CT
EASTCREST CT
GRAYSTONE CT
MC CALL AVE
MALICK AVE
JESSIE AVE
CAROLINA AVE
DEER CREEK DR
MACKENZIE DR
BRANDSTATT AVE
EDGEWATER WAY
VITTORIA GROVE CT
IDAHO WAY
KELLI DR
SAVANNAH DR
EPLEY DR
MOSBURG LP
WINDWA RD W AY
CLAREMONT WAY
WHITE WATER WAY
WHISPERING OAKS DR
CO U RTYARD WAY
MISSISSIPPI DR
BIG OAKS DR
KAREN DR
STAPLE DR
BURNS DR
HASSETT AVE
GENEVA AVE
PUTMAN AVE
EASTWIND DR
CELEST AI L WAY
HILLCREST AVE
TUSCAN RD
Lighting & Landscape
Maintenance District No. 1
Zones of Benefit
QUEENS AVE
S WALTON AVE
CLARK AVE
GRAY AVE
BUTTE HOUSE RD
FRANKLIN AVE
WESTERN PKWY
SUNSWEET BLVD
N WALTON AVE
PLUMAS ST
ROYO RANCHERO RD
RICHLAND RD
LINCOLN RD
GEORGE WASHINGTON BLVD
OHLEYER RD
SHANGHAI BEND RD
HARTER PKWY
THARP RD
HOOPER RD
TIERRA BUENA RD
STABLER LN
RAILROAD AVE
LIVE OAK BLVD
BRIDGE ST
S GEORGE WASHINGTON BLVD
GRAY AVE
LINCOLN RD
CLARK AVE
FRANKLIN RD
PEASE RD
GARDEN HWY
BOGUE RD
Highway 20
Highway 99 Highway 99
Legend
Maintenance Districts
City Limits
ATTACHMENT 3
DISTRICT 1 AND 2 PROPOSED ASSESSMENTS
District Zone of Benefit
FY 2024-25
Proposed Levy
Rate ($)
Change From
Previous Year
($)
Maximum
Levy Rate
Allowed ($)
A $56.72 $0.00 $56.72
B $29.50 $0.00 $29.50
B_1 $41.34 $1.22 $41.34
1 B_2 $378.30 $11.02 $378.30
ATTACHMENT 4
2025/2026 Lighting and Landscape Maintenance District No. 1 Page 1 of 16
City of Yuba City
Landscape Maintenance
District No. 1
Zone of Benefit A
Zone of Benefit B
Zone of Benefit B_1
Zone of Benefit B_2
2025/2026 ENGINEER’S ANNUAL LEVY REPORT
Initiation Meeting: June 17, 2025
Intent Meeting: July 1, 2025
Public Hearing: July 15, 2025 27368 Via Industria
Suite 200
Temecula, CA 92590
T 951.587.3500 | 800.755.6864
F 951.587.3510
www.willdan.com
ENGINEER'S REPORT AFFIDAVIT
City of Yuba City
Sutter County, State of California
Yuba City Landscape Maintenance District No. 1
This Report describes the District including the improvements, budgets, parcels and assessments to be levied for Fiscal Year 2025/2026, as they existed at the time of the passage of the Resolution of Intention. Reference is hereby made to the Sutter County Assessor’s maps for a detailed description of the lines and dimensions of parcels within the District.
The undersigned respectfully submits the enclosed Report as directed by the City Council.
Dated this ____________ day of ______________, 2025.
Willdan Financial Services
Assessment Engineer
By: ________________________________
Tony Thrasher
Principal Consultant
District Administration Services
By: ________________________________
Tyrone Peter
PE # C 81888
TABLE OF CONTENTS
I. OVERVIEW 2
A. INTRODUCTION 2
B. COMPLIANCE WITH CURRENT LEGISLATION 3
II. PLANS AND SPECIFICATIONS 4
A. DESCRIPTION OF THE DISTRICT 4
B. DESCRIPTION OF THE IMPROVEMENTS 4
III. METHOD OF APPORTIONMENT 5
A. GENERAL 5
B. BENEFIT ANALYSIS 5
C. ASSESSMENT METHODOLOGY 8
D. ASSESSMENT RANGE FORMULA 8
IV. DISTRICT BUDGET FY 2025/2026 11
APPENDIX A - DISTRICT BOUNDARY MAPS 13
APPENDIX B – 2025/2026 ASSESSMENT ROLL 16
2025/2026 Lighting and Landscape Maintenance District No. 1 Page 2 of 16 I. OVERVIEW
A. INTRODUCTION
The City of Yuba City (“City”) annually levies and collects special assessments to maintain and service landscape improvements that provide special benefit to the Yuba City Lighting and Landscape Maintenance District (“District”). The District is annually levied pursuant to the Landscape and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (“1972 Act”). The District assessments were approved by the property owners of record through a protest ballot proceeding at the time the District was formed in compliance with the substantive and procedural requirements of the California Constitution Article XIIID (“Article XIIID”).
This Engineer’s Annual Levy Report (“Report”) has been prepared in accordance with the provisions of Chapter 3, Section 22622 of the 1972 Act. This Report describes the District, the improvements therein, any annexations or other modifications to the District including any substantial changes to the improvements, the method of apportionment, the boundaries of the District, and financial information including the district budgets and proposed annual assessments for Fiscal Year 2025/2026. The proposed assessments are based on the historic and estimated costs to maintain the improvements that provide a direct and special benefit to properties within the District. The costs of improvements and the annual levy including all expenditures, deficits, surpluses, revenues, and reserves are assessed to each parcel within the District proportionate to the parcel’s special benefits.
For the purposes of this Report, the word “parcel” refers to an individual property assigned its own Assessor Parcel Number (“APN”) by the County of Sutter (“County”) Assessor’s Office. The County Auditor/Controller uses APNs and specific fund numbers to identify properties assessed for special district benefit assessments on the tax roll.
Pursuant to Chapter 3, beginning with Section 22620 of the 1972 Act, the City Council shall conduct a noticed annual public hearing to consider all public comments and written protests regarding the District. Following the annual public hearing and review of the Report, the City Council may order amendments to the Report or confirm the Report as submitted. Following final approval of the Report and confirmation of the assessments contained therein, the City Council will by resolution: order the improvements to be made and confirm the levy and collection of assessments pursuant to Chapter 4, Article 1, beginning with Section 22640 of the 1972 Act. The assessment rates and method of apportionment described in this Report define the assessments to be applied to each parcel within the District for Fiscal Year 2025/2026.
2025/2026 Lighting and Landscape Maintenance District No. 1 Page 3 of 16 The assessments as approved will be submitted to the County Auditor/Controller to be included on the property tax roll for each parcel within the District. If any parcel submitted for collection is identified by the County Auditor/Controller to be an invalid APN for the current fiscal year, a corrected parcel number and/or new parcel numbers will be identified and resubmitted to the County. The assessment amount to be levied and collected for the resubmitted parcel or parcels shall be based on the method of apportionment and assessment rate contained in this Report as approved by the City Council.
B. COMPLIANCE WITH CURRENT LEGISLATION
On November 6, 1996, California voters approved Proposition 218 by a margin of
56.5% to 43.5%. All assessments described in this Report and approved by the City Council are prepared in accordance with the 1972 Act and are in compliance with the provisions of the California Constitution Article XIIID (Proposition 218).
Pursuant to the California Constitution Article XIIID Section 5, certain existing assessments are exempt from the substantive and procedural requirements of Article XIIID Section 4 and property owner balloting for the assessments is not required until such time that the assessments are increased. Specifically, the City determined that all improvements and the annual assessments originally established for the District were part of the conditions of property development and approved by the original property owner (developer). As such, pursuant to Article XIIID Section 5(b), all the property owners approved the existing District assessments at the time the assessments were created (originally imposed pursuant to a 100% landowner petition). Therefore, the pre-existing assessment amounts are exempt from the procedural requirements Article XIIID Section 4.
The District has been formed pursuant to the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code.
Pursuant to the 1972 Act, an annual Public Hearing is conducted by the City Council to accept property owner and public comments, to review the Engineer’s Annual Levy Report prior to approving the annual assessments to be levied on the County tax rolls. The assessments described in this Report have been prepared in accordance with the Act.
The City affirms that the assessments contained in this report for Zones A and B, were imposed in accordance with a consent and waiver by 100% of the property owners as part of the original development approval for the properties within the District. Therefore, the City has determined that pursuant to Article XIIID Section 5(b) the maximum assessment previously approved and levied for these Zones prior to the passage of Proposition 218 are considered exempt, provided the assessments are not increased above these previously approved maximum assessment rates.
2025/2026 Lighting and Landscape Maintenance District No. 1 Page 4 of 16 The proposed annual levy of assessments for fiscal year commencing July 1, 2025 and ending June 30, 2026 (Fiscal Year 2025/2026) as described in this Report have been prepared and made pursuant to the provisions of the 1972 Act and are consistent with the assessments previously approved and adopted by the City Council. The assessments described herein for Fiscal Year 2025/2026 do not exceed the maximum assessment rates authorized and are therefore in compliance with the provisions of the California Constitution Article XIIID.
II. PLANS AND SPECIFICATIONS
A. DESCRIPTION OF THE DISTRICT
The District is comprised of four benefit areas: Zone of Benefit A (North Stabler Lane Area), Zone of Benefit B (South Yuba City Area), Zone of Benefit B-1 (Clark Pest Control and 1441 Garden Highway) and Zone of Benefit B-2 (Dollar General).
The Zone of Benefit A (“Zone A”) benefits parcels consisting of 79 residential lots in the Greenwood Acres Unit 1 and Unit 4 subdivisions, 66 residential lots in Oak Tree Estates, 172 residential lots in the Pheasant Pointe Subdivision and 71 residential lots in the Greenwood Estates Unit 7 subdivision.
The Zone of Benefit B (“Zone B”) benefits parcels consisting of 319 residential lots in the Southwind and Southland Village Subdivisions, 101 lots in the River Bend Subdivision, 31 present and future residential lots in River Pointe Subdivision, 757 present and future equivalent dwelling units in the River Run Subdivisions, 618 present residential lots in the River Oaks subdivisions, 420 present and future residential lots in the Walnut Glen Subdivisions, 75 lots in Diamond Point Subdivision and 64 present and future residential lots in the Southpointe Subdivision. The River Run Subdivision has 194 equivalent dwelling units of R-3 and 276 equivalent units of Commercial based on 20 equivalent dwelling units per acre.
The Zone of Benefit B-1 (“Zone B-1”) benefits four commercial parcels located at 1288 Garden Highway and 1441 Garden Highway.
The Zone of Benefit B-2 (“Zone B-2”) benefits two commercial parcels located at 1500 and 1510 Garden Highway.
B. DESCRIPTION OF THE IMPROVEMENTS
The District improvements provide for the ongoing maintenance and servicing of landscaping improvement areas adjacent to Zone A, Zone B, Zone B-1 and Zone B-2 as shown on the Assessment Diagrams on file with the City Clerk.
Maintenance improvements may include but are not limited to: turf, ground cover, shrubs, trees, plants, irrigation and drainage systems, ornamental lighting structures, masonry walls or other fencing, entryway monuments, and associated appurtenant facilities located within the streetscape (perimeter landscaping)
2025/2026 Lighting and Landscape Maintenance District No. 1 Page 5 of 16 surrounding the developments. Servicing improvements may include, but are not limited to: electricity, water for irrigation of any landscaping, and the operation of fountains.
The annual cost and expenses of providing the landscape maintenance and servicing in Zone A, Zone B, Zone B-1 and Zone B-2 are estimated separately and are apportioned equally to all lots, developed or undeveloped, within each Zone.
III. METHOD OF APPORTIONMENT
A. GENERAL
The 1972 Act permits the establishment of assessment districts by agencies for the purpose of providing certain public improvements which include the construction, maintenance and servicing of public lights, landscaping and appurtenant facilities. The 1972 Act further requires that the cost of these improvements be levied according to benefit rather than assessed value:
“The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.”
The formula used for calculating assessments in the District therefore reflects the composition of the parcels, and the improvements and services provided, to fairly apportion the costs based on estimated benefit to each parcel.
In addition, pursuant to the Article XIIID Section 4, a parcel’s assessment may not exceed the reasonable cost of the proportional special benefit conferred on that parcel and provides that only special benefits are assessable and the District must separate the general benefits from the special benefits.
B. BENEFIT ANALYSIS
Each of the improvements and the associated costs has been carefully reviewed and the corresponding assessments have been proportionately spread to each parcel based on special benefits received from the improvements. The installation of the improvements was part of the conditions of property development. The property owners approved the corresponding assessments for the ongoing maintenance and servicing of the improvements through a property owner protest ballot.
Special Benefits — the method of apportionment (assessment methodology) is based on the premise that each of the assessed parcels within the District
2025/2026 Lighting and Landscape Maintenance District No. 1 Page 6 of 16 receives benefit from the improvements maintained and financed by annual assessments. Specifically, the assessments are for the maintenance of landscaped improvements installed as part of the original development. The desirability of properties within the District is enhanced by the presence of wellmaintained landscaping in close proximity to those properties.
The special benefits associated with the local landscaping improvements are specifically:
Enhanced desirability of properties through association with the improvements.
Improved aesthetic appeal of properties within the Zones providing a positive representation of the area.
Enhanced adaptation of the urban environment within the natural environment from adequate green space and landscaping.
Environmental enhancement through improved erosion resistance, and dust and debris control.
Increased sense of pride in ownership of property within the District resulting from well-maintained improvements associated with the properties.
Reduced criminal activity and property-related crimes (especially vandalism) against properties in the District through well-maintained surroundings and amenities including abatement of graffiti. Enhanced environmental quality of the parcels within the Zones by moderating temperatures, providing oxygenation and attenuating noise.
General Benefits - the improvements to be provided and maintained by the District are a direct result of property development within the District and would otherwise not be required or necessary. Developers typically install local improvements to enhance the marketability and value of properties within the development and/or as conditions of development. In either case, the improvements are clearly installed for the benefit of the properties being developed and not for the benefit of surrounding properties outside the District boundaries. Although local development improvements (by virtue of their location) may be visible to surrounding properties, any benefit to surrounding properties is incidental and cannot be considered a direct and special benefit.
Furthermore, most developments within the City typically have various landscaping and lighting improvements specifically associated with their development and these improvements are funded by properties within those developments.
At the time of formation of the Assessment District, the majority of the benefit was special, and there was a small general benefit. The engineer of record between Fiscal Year 2012/2013 and Fiscal Year 2015/2016, further quantified this small general benefit.
2025/2026 Lighting and Landscape Maintenance District No. 1 Page 7 of 16 The specific language from the most recent Engineer’s Report used to describe General Benefit is as follows:
The maintenance and servicing of these improvements is also partially refunded, directly and indirectly from other sources including Yuba City, Sutter County and the State of California. This funding comes in the form of grants, development fees, special programs, and general funds, as well as direct maintenance and servicing of facilities (e.g. curbs, gutters, streets, drainage systems, etc.) This funding from other sources more than compensates for general benefits, if any, received by the properties within the Assessment District.
The General Benefits from this assessment may be quantified as illustrated in the following table.
Benefit Factor Relative
Weight
General Benefit
Contribution
Relative
General
Benefit
Creation of parcels 90 0% 0
Extention of recreation area 2 10% 0.2
Proximity to improved parks and recreation facilities 2 10% 0.2 Access to improved parks, open space and rec areas 2 10% 0.2 Improved views 2 10% 0.2
Improved nighttime visibility and safety from streetlights 2 20% 0.4 Totals 100 1.2
Total Calculated General Benefit 1.2%
As a result, Yuba City will contribute at least 1.2% of the total budget from sources other than the assessment. This contribution offsets any general benefits from the Assessment Services.
This general benefit contribution is the sum of the following components:
Yuba City owns, maintains, rehabilitates and replaces curb and gutter along the border of the Assessment District improvements. This curb and gutter serves to support, contain, retain, manage irrigation flow and growth, and provide a boundary for the improvements. The contribution from the City towards general benefit from the maintenance, rehabilitation and replacement of the curb and gutter is conservatively estimated to be 1%.
Yuba City owns and maintains a storm drainage system along the border of the Assessment District improvements. This system serves to prevent flooding and associated damage to the improvements, and manage urban runoff including local pollutants loading from the improvements. The