Yucaipa City Council
Pages
5
Original file
27 KB
Text extracted from the city's file for reading and search. Open the original on coydocs.yucaipa.gov. That file is the official record.

Agenda Item No. 10

CITY OF YUCAIPA

AGENDA REPORT
TO: Honorable Mayor and City Council
FROM: Fermin Preciado, Director of Development Services/City Engineer Landon Kern, Assistant City Engineer
Katrina Kunkel, Associate Engineerval—
FOR: City Council Meeting of January 9, 2023
SUBJECT: Award of Construction Contract — County Line Road Mobile Source Air Pollution Reduction Review Committee (MSRC) Grant Funded Project
RECOMMENDATION:

That City Council:

Award and authorize the Mayor to execute a contract in the amount of $451,691 with Three Peaks Corp. of Calimesa, CA for the County Line Road Mobile Source Air Pollution Reduction Review Committee (MSRC) Grant Funded Project — Project No. 11118; and

2. Approve the amount of $50,000 for construction contract contingency and the amount of $45,000 for construction contract administration, survey, testing and inspection for a total project construction budget in the amount of $546,691; and

3. Authorize the City Manager, or his designee, to administer the terms of the contract; and

4. Approve the Plans and Specifications prepared for the Project.

BACKGROUND/DISCUSSION:

County Line Road is a major arterial road which borders both the City of Yucaipa and the City of Calimesa. The existing interchange at the Interstate 10 Freeway and County Line Road provides access to and from the freeway for the citizens and business community from both cities.

Existing development along County Line Road includes both residential and commercial land uses. County Line Road is utilized not only by vehicular traffic but is also used by pedestrians and cyclists as well.

Vehicular traffic on County Line Road has continuously increased over the years and currently, the intersections between Calimesa Boulevard and Bryant Street are impacted during peak morning and evening commuting hours. Proposed commercial and residential developments currently being planned in both cities will further impact traffic along County Line Road. 457

City Council Meeting of January 9, 2023
Award of Contract - County Line Road MSRC Project, Project No. 11118

Page 2 of 5 ends

At the July 8, 2013 City Council Meeting, City Council approved the Citywide Miscellaneous Intersection Roundabout Study (Study) prepared by RBF Consulting. The Study identified strategic intersections along arterial streets including Yucaipa Boulevard, Avenue E, and County Line Road, in the City where vehicular traffic circulation would be improved and operate more efficiently in the long term with the construction of roundabouts. The Study also showed that potential single -lane roundabout intersections would improve operation and traffic flow along street segments between intersections along the arterial streets. As a result of the implementation of roundabout intersections into the City's General Plan Transportation Element, certain segments of the City's arterials would not require widening from two (2) lanes to four (4) lanes.

These intersection improvements reduced the need for street widening and significantly reduced the amount of right-of-way (and associated costs) and street improvements required to accommodate future traffic conditions along these corridors. Additionally, roundabout intersections introduce significant intersection safety enhancements for both pedestrians and vehicles and represents a cost savings to the City when considering the long-term maintenance costs associated with traffic signal equipment and utility costs.

In early 2017, discussions were held with the City of Calimesa regarding joint participation for the improvements on County Line Road in order to improve operation and traffic flow through the intersections and improve safety for pedestrians and bicyclists. Since both cities would mutually benefit from these improvements, an agreement was prepared in order to identify the responsibility and funding commitment of both cities for the various improvements along County Line Road. These improvements along County Line Road between Bryant Street and Calimesa Boulevard make up the County Line Road Transportation Corridor Project (Project). City Council approved a Fair Share Funding Agreement with the City of Calimesa for the Active Transportation Program (ATP) and Air Quality Management District - Mobile Source Reduction Committee (MSRC) grant funding at the March 12, 2018 City Council Meeting. City Council approved the SB 1 Local Partnership Program (LPP) Grant Funding Agreement with the City of Calimesa at the City Council Meeting of October 26, 2020.

The agreement identifies the City of Yucaipa's share of the grant funding in the amount of $1,986,000 and the local match contribution in the amount of $4,530,000 for the Project. The City of Calimesa's share of the grant funding is in the amount of $1,761,000 and their local match contribution is in the amount of $1,892,750.

The agreement identifies the following obligations for the City of Calimesa:
• Serve as the lead agency for the Project soliciting Requests for Proposals and bids, as required, and awarding contract(s).
• Provide the services of their City Engineer for the purpose of certifying plans, providing cost estimates, inspections, maintaining all records and providing all reporting as required by the California Department of Transportation (Caltrans), • Obtain approval from Yucaipa for each bid package prior to bidding a phase of construction.
• Allow Yucaipa to inspect all work within the City of Yucaipa's jurisdiction during construction and as part of the overall final inspection of the work. 458

City Council Meeting of January 9, 2023
Award of Contract - County Line Road MSRC Project, Project No. 11118

Page 3 of 5 ends

• Obtain approval from Yucaipa before issuance of any change orders or stop work orders that could potentially affect Yucaipa's cost.
• Submit to Yucaipa, on a monthly basis, a status of the work completed to date accompanied by a detailed listing of expenditures of the current month and total spent to date. This will also include a fair share project invoice to Yucaipa as appropriate.

The agreement identifies the following obligations for the City of Yucaipa:
• Provide the services of its City Engineer for the purpose of certifying plans and as -built plans, reviewing cost estimates, inspections and records as required. • Prepare plans, specifications and cost estimates; and identify and acquire necessary right- of-way for the segment between Park Avenue and up to and including the 5th Street Intersection. (this segment of the project is all within the City of Yucaipa's jurisdiction) • Yucaipa shall deposit the amount of $653,500 to Calimesa within thirty (30) calendar days from execution of this Agreement by both Cities for Yucaipa's share of the cost of the environmental review, design/engineering, Caltrans Project approval processing and the preparation of construction bid documents.
• Pay invoices submitted by Calimesa for the construction phase of the project within thirty (30) days of receipt. Yucaipa's total share of construction is estimated to be $2,637,250. • Yucaipa's cost shall not exceed $4,410,250 without an amendment to the Agreement.

To fund the Project, the City of Yucaipa and City of Calimesa collaborated on grant funding applications. The Cities successfully acquired grant funding from Caltrans — ATP grant funds in the amount of $512,000 (lead agency - Yucaipa) for street improvements between California Street and 3rd Street; Air Quality Management District — MSRC grant funds in the amount of $380,000 (lead agency - Yucaipa) for street improvements between Calimesa Blvd and 4th Street; and California Transportation Commission LPP grant funds in the amount of $3,747,000 (lead agency - Calimesa) for the remaining segments of the Project. For the City of Yucaipa Development Impact Fee (DIF), Pavement Management Program (PMP), SB 1 and Measure I funds are being used as the local match for the grant funding. The ATP funded portion of the Project has been completed, the LPP funded portion is currently under construction and the MSRC portion is planned to be constructed next. At the August 13, 2018, City Council Meeting, Council approved a Professional Services Agreement with LAN Engineering to complete the engineering, design and construction plans for the MSRC portion.

The MSRC grant includes funding for the construction of pedestrian access improvements, including sidewalk and curb ramps, and bicycle lanes on the north and south side of County Line Road, between Calimesa Boulevard and a point just west of 4th Street where a segment of County Line Road will remain two lanes. This grant funded project does not include the roundabout at County Line Road and 51h Street, which is a component of the LPP funded portion currently under construction.

On November 23, 2022, the Project was advertised for construction bids. On December 13, 2022, number (5) sealed bids were received and opened as follows:
459

City Council Meeting of January 9, 2023
Award of Contract - County Line Road MSRC Project, Project No. 11118

Page 4 of 5 ends

Bidder
Bid Amount
Three Peaks Co
$451,691
DM Contracting Inc
$536,950
Leonida Builders Inc
$672,218
Gentry General Engineering Inc
$815,989
Onyx Paving Company Inc
$927,000
The Engineer's Estimate for the Project is $540,000. Three Peaks Corp is the apparent low bidder for the Project with a bid in the amount of $451,691. Staff has reviewed the bid and compared it with current market bid prices and determined that the bids received are consistent with the current construction market. Staff has also reviewed the apparent low bidder's bid documents and determined that they meet the contract specifications for the Project. Three Peaks Corp. has completed previous similar work for the City of Yucaipa and other public agencies and their work has been deemed satisfactory. As a result, staff recommends that City Council award a contract in the amount of $451,691 to Three Peaks Corp for this Project.

FISCAL IMPACT:

The table below includes available and proposed funding and estimated costs for the Project:

Combined County Line Road Corridor Projects:

Funding Sources
Amount
MSRC Grant
$380,000
Measure I Arterial Funds
2,929,000
Measure I Advanced Expenditure Funds
2,106,000
Pavement Management Program (PMP)
200,000
SB 1
685,000
SB1/LPP Grant
1,986,000
Total Funding Available
$8,286,000
Estimated Costs
Project Design (MSRC & LPP Project)
Design Contract
$663,172
Design Contract Contingency
85,862
Design Contract Administration/Staff Time/Grant Coord./Environ. 301,323
Total Design Costs to Date
$1,050,357
Right -of -Way Acquisition
Right of Way Acquisition
$1,795.959
Right of Way Acquisition Coordination/Staff Time
98,500
Right of Way Legal Fees
101,820
Total Right of Way Costs to Date
$1,998.579
460

City Council Meeting of January 9, 2023
Award of Contract - County Line Road MSRC Project, Project No. 11118

Page 5 of 5 ends

Structure Demolition
Demolition Contract
$37,000
Demolition Contract Contingency
6,000
Demolition Contract Permitting/Inspection
4,500
Phase 1 Assessment/Environmental Review
13,154
Total Estimated Right of Way Costs to Date
$60,654
Construction
LPP Maximum Fair Share Contribution to City of Calimesa $4,581,463
Proposed Construction Contract (2)
$451,691
Proposed Construction Contract Contingency (2)
50,000
Proposed Construction Contract Staff/Admin/Inspection/Survey (2) 45,000
Total Proposed Construction Contract to Date
$546,691
Total Estimated Construction to Date
$5,128,154
Total Estimated Costs to Date
$8,222,044
Balance Remaining
$48,256
�l> Fair Share agreement for ATP and MSRC grant funding approved by City Council on 3/12/2018. Fair Share agreement for LPP grant funding approved by City Council on 10/26/2020. Costs include construction, construction management/inspection, and environmental review. (2) Included as part of this Council Recommendation
With the total available and proposed funding included in the table above, there is sufficient funding available to accommodate staff s recommendations.

Attachments: Bid Summary
Agreement
Project Related Exhibits
Specifications and Plans are available in the office of the City Engineer Approved by: /I L4n'14 Ile
461

COUNTY LINE ROAD PEDESTRIAN IMPROVEMENTS MSRC
Owner:City of Yucaipa
Bid Opening:2022-12-13 marksan all -an-
Engineer's Estimate
Three Peaks Corp.

DM Contracting, Inc.

Leonida Builders Inc
Gentry General Engineering, Inc.

Onyx Paving Co.

PO BOX 101
Calimesa, CA 92320
u5
Bid Status:Valid
1065 Harbor Drive
Colton, CA 92324
US
Bid Status:Valid
15821 Live Oak Springs Canyon Rd
SANTA CLARITA, CA 91387
Bid Status:Valid
9277 Archibald Ave
Rancho Cucamonga, CA 91730
u5
Bid Status:Valid
2890 E LA Cresta Ave
Anaheim, CA 92806
Bid Status:Valid
County Line Road Pedestrian Improvements MSRC Project 11118 Item p
Item Code
Item Description
Quantity
Unit of Measure
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
1 SAWCUT AND REMOVE PCC CURB &
1045
SF
$0.00
$0.00
$5.00
$5,225.00

13.00 $13,585.00
510.00
10,450.00
$30.00131,350.00
540.00
$41,800.00
2 SAWCUT AND REMOVE EXISTING PCC
8168
SF
$0.00

0.00 524,504.00

53.00 5 24,504.00
'5 00
$40,840.00

57.50 61,260.00

6.00 49,008.00
3 PULVERIZE EXISTING AC SIDEWALK
3309
SF

50.00 0.00

53.00 $9,927.00

3.00 9,927.00

3.00 $9,927.00
$4.50
514,890.50
$3.00
$9,927.00
4 REMOVE & REPLACE OR RELOCATE
131
LF
SO.00

0.00 $76.00
9,956.00

45.00 5,895.00

75.00 $9,825.00

70.00 9,170.00
300.00
$39,300.00
5 ADJUST EXISTING UTILITY TO GRADE.
5 EA

50.00 0.00
5500.00
$2,500.00
1,000.00
$5,000.00
$1,000.00
5,000.00
$1,954.00
9,770.00
1,200.00
$6,000.00
6 REMOVE AND RELOCATE BEHIND BACK OF
1 EA

50.DD

0.00 56,776.00
6,776.00
2, 500.00
2, 500.00
2,OOO.00
$2, 000.00
$3,037.00
53,037.00
13,000.00
513,000.00
7 COLD PLANE 2-INCHES MIN. OF EXISTING AC
1165
5F
W.00

0.00 $2.60
$3,029.00

6.00 $6,990.00
$2.001
52,330.00

53.20 $3,728.00

57.00 58,155.00
8 REMOVE AND RELOCATE EXISTING MAILBOX
5 EA

50.00 $0.00
$300.00
$1,500.00
$400.00
52,000.00
$500.00
$2,500.00
5590.00
$2,950.00
1,000.00
$5,000.00
9 RELOCATE EXISTING BUSINESS SIGNS.
1 EA
$0.00

0.00 3, 945.00
$3,945.00
52,500.00
2,500.00
51,000.00
1,000.00
$590.00
$590.00
$2,500.00
2,500.00
10 REMOVE AND RELOCATE EXISTING
2 EA
$0.00

0.00 1, 972.50
3,945.00
500.00
1,000.00
6,000.00
12,000.00
52,100.001
54,200.00
3,000.00
6,000.00
11 REMOVE EXISTING TREE
9 EA
$0.00
$0.00
1,7 00.00
15,3 00.00
1,1 00.00
9,900.00
3,000.00
$27,000.00
$3,400.00
30,600.00
3,000.00
27,000.00
12 REMOVE EXISTING SIGN & POST
4 EA

50.00 0.00
250.00
1,000.00
400.00
1,600.00
700.00
2,800.00
590.00
2,3 00.00
1, 500.00
56,000.00
13 REMOVE AND REPLACE EXISTING
1 LS

50.00 0.00
5,959.00
5,959.00
12,000.00
$12,000.00
$25,000.00
25,000.00
29,000.00
29,000.00
$30,000.00
530,000.00
14 REMOVE SECTION OF PARKWAY DRAIN PER
54 SF
SO.00

0.00 11. 00
$594.00

65.00 3,510.00
$100.00
5,400.00

33.00 1,732.00
5350.00
18, 900.00
15 REMOVE AND RECONSTRUCT BACKFLOW
1 EA
50ml)

0.00 -3 500.00
3,500.00
20,000.00
20,000.00
5,000.00
5,000.00
$13,200.00
13,200.00
525,000.00
25, 000.00
16 REMOVE AND RELOCATE BOLLARD PER
3 EA
$O.UU

0.00 500.00
51,500.00
350.00
1,050.00
$500.00
1,500.00
6 11.00
2,043.00
3,000.00
9,000.00
17 REMOVE IRON PIPE AND FOOTING
18 EA
$0.D0

0.00 95.00
1,710.00
150.00
2,700.00
500.00
9,500.00
734.00
13,212.00
5500.00
9,000.00
18 SAWCUT AND REMOVE AC BERM
443
LF
SO.00
$0.00

7.00 3,101.00

7.00 3,101.00

3.00 1,329.00

31.00 $13,733.00
$11.00
4,873.00
19 CONSTRUCT 8” CURB & GUTTER
890
LF
$O.UU

0.00 54.00
48,060.00
$51.00
$45,390.00

50.00 44,5 00.00

78.00 69,420.00
566.00
58,740.00
20 CONSTRUCT TYPE A-8 PCC CURB &
340
LF
$O.UU

0.00 56.50
19,2 00.00

54.00 18, 360.00
$48.00
16,320.00

87.00 29,580.00
$70.00
23,800.00
21 CONSTRUCT PCC SIDEWALK PER CITY OF
6690
SF

50.00 0.00

8.50 56,8 55.00

9.00 $60,210.00
$10.00
66,900.00

9.80 65,562.00

9.00 60,210.00
22 CONSTRUCT PCC SIDEWALK PER RIVERSIDE
2160
SF
SO.00
$0.00
9,00
19,440.00
512.00
525,920.00
$11.00
23,760.00
$10.75
23,220.00

10.00 21,6 00.00
23 CONSTRUCT COMMERCIAL DRIVEWAY PER
2740
SF
$0.00

0.00 12.00
$32,880.00
512.00
$32,880.00
513.00
35,620.00
$24.00
$65,760.00

12. 00
$32,880.00
24 CONSTRUCT RESIDENTIAL DRIVEWAY PER
760
SF

50.00 $0.00
$9.00
$6,84000
$10.00
7,600.00
512.00
$9,120.00

21.00 15,960.00
$15.00
$11,400.00
25 ICONSTRUCT RESIDENTIAL DRIVEWAY PER
1060
SF

50.00 0.00

10.00 10,600.00
$12.00
12,720.00

12. 00
512,720.00
524.00
25,440.00
$15.00
$15,900.00
26 CONSTRUCT CURB RAMP PER SPPWC STD
440
SF

50.00 0.00
$14.00
6,160.00
530.00
13,200.00
100.00
44,000.00

15.00 6,600.00

40.00 17,600.00
27 CONSTRUCT 8” ASPHALT CONCRETE
20 LF

50.00 0.00
288.00
5,760.00
126.00
2,520.00
100.00
2,000.00

43.00 860.00
330.00
$6,600.00
28 CONSTRUCT 4.5” ASPHALT
3400
SF

50.00 0.00
9,42
32,028.00

20.00 68,000.00

9.00 30,600.00

26.00 88,400.00
$11.00
29 CONSTRUCT 2” MINIMUM ASPHALT
3500
SF

50.00 0.00

3.20 11,200.00

8.00 28,000.00

4.00 14,000.00
$7.33
25,655.00

5.50 19,250.00
$19,250.00
30 CONSTRUCT 6” PCC OVER 95%
2 CY
$0.00

0.00 $1,085.00
2,170.00
800.00
$1,600.00
500.00
1,000.00
1,100.00
2,200.00
4,000.00
$8,000.00
31 CONSTRUCT 3” ASPHALT CONCRETE
1600
SF
$0.00
$0.00

5.40 8,640.00
$8.50
$13,600.00

6.00 $9,600.00
$8.75
$14,000.00
$9.90
$15,840.00
32 CONSTRUCT 3 #8221; GRAVEL ON 95%
2 CY

50.00 $0.00
$1,18500
$2,370.00
5800.00
51,600.001
$500.00
1,000.00
798.00
1, 596.00
51,500.00
3,000.00
33 REGRADE BACK OF SIDEWALK TO ROW PER
1 LS
$0.00

0.00 4,899.00
4, 899.00
5,000.00
5,000.00
$33,000.00
33,000.00
21,610.00
21,610.00
49,000.00
49,000.00
34 EXTEND PARKWAY DRAIN PER APWA STD
1 LS
SO.UO

0.00 2,460.00
2,460.00
6,OOO.DD
6,000.00
5,000.00
$5,000.00
4,000.00
4,000.00
8,000.00
8,000.00
35 INSTALL MAILBOX ON NEW POST BEHIND
5 EA
$0.00

0.00 350.00
1,750.00
400.00
2,000.00
700.00
$3,500.00
1,7 00.00
8, 850.00
1, 500.00
7,500.00
36 TRAFFIC CONTROL
1 LS
$0.00

50.00 29,688.00
29,688.00
21,5 88.00
21,588.00
75,000.00
75,000.00
42,600.00
542,600.00
5142,000.00
142,000.00
37 MOBILIZATION NOT MORE THAN 5% OF
1 LS

50.0U
$0.00
20,000.00
00,0 00.00
23,000.00
23,000.00
28,6 77.05
28,677.05
32,800.00
32,800.00
542,000.00
42,0 00.00
38 SIGNING AND STRIPING
1 LS

50.O0

0.00 26,7 00.00
26,7 00.00
20,000.00
$20,000.00
$43,000.00
$43,000.00
$25,000.00
25,0 00.00
35,8 77.00
35,8 77.00
Bid List Total

0.00 451,691.00
$536,950.00
$672,218.05
815,988.50
927,000.00
ADDITIVE ALTERNATE BID #1
Item q
I Item Code
Item Description
1 Quantity
Unit of Measure
Unit Price
Item Total
Unit Price
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
Unit Price
Item Total
6A

REMOVE AND RELOCATE BEHIND BACK OF
1 EA
SD.DD

0.00 $6,776.00
$11,000.00
11,OOO.OD
7,500.00
7,500.00
7,644.00
7,644.00
22,000.00
ZZ,000.00Bid
List Total

0.00 ffi,776.00
11,000.00
7,500.00
7,644.00
22,000.00Total
Bid Amount
$0.00
$4
$547,950.00
$679,718.051
$823,632.50
$949.000.00
Listed Subs
Matich Corporation
1596 E Harry Sheppard Blvd
San Bernardino, CA 92408
Superior Pavement Markings
5312 Cypress Street
Cypress, CA 90630
Chrisp Company
2280 S Lilac Ave
Bloomington, CA 92316
Pavement Recycling Systems
10240 San Sevaine Way
Jurupa Valley, CA 91752
All American Asphalt
400 E 6th St Corona CA 92879
Corona, CA 92878
PCI
975 W 1st St
Azusa, CA 91702
Superior Pavement Markings
5312 Cypress Street
Cypress, CA 90630
V & E Tree Service
P 0 Box 3280
Orange, CA 92857
Cal Stripe Inc.
2040 E Steel Rd
Colton, CA 92324
Logos Engineering
Treesmith Enterprises, Inc.
1551 N Miller
Anaheim, CA 92806
462

AGREEMENT
THIS AGREEMENT is made and entered into this 9th day of January 2023, by and between the City of Yucaipa, a municipal corporation, hereinafter referred to as "City", and Three Peaks Corp located at
Contractor / Company Name
Calimesa
City
P.O. Box 101
Street Address
CA 92320 (909)795-1690 hereinafter referred to as "Contractor".

State Zip Code Phone
PROJECT: County Line Pedestrian Improvements MSRC Project No. 11118 WITNESSETH, in this consideration of their covenants, the parties hereto agree as follows:

The contract documents for the Project shall consist of the Notice Inviting Sealed Bids, Instructions to Bidders, Proposal, General Specifications, Standard Specifications, Special Provisions, Plans, and all referenced specifications and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices, and affidavits; and also including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner (collectively, the "Contract Documents"). The Contract Documents are made a part hereof as though fully set forth herein.

In consideration of such work, City agrees to pay Contractor and Contractor agrees to accept the sum of Four Hundred Fifty -One Thousand, Six Hundred Ninety -One Dollars ($451,691.00) in the manner provided in the Contract Documents and subject to adjustment provided therein.

Concurrently with the execution of this Agreement, Contractor shall file with the City the bonds and certificates of insurance specified in the Contract Documents and subject to adjustment provided therein.

This Contract shall not be assigned without the written permission of the City Council.

IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written.

ATTEST:

Kimberly J. Metzler
City Clerk
FUNDS AVAILABLE:

Phillip White Director of Finance
Fermin G. Preciado, Director of
Development Services/City Engineer
APPROVED AS TO FORM:

David M. Snow, City Attorney

CITY OF YUCAIPA
A Municipal Corporation
Justin Beaver, Mayor
CONTRACTOR:

Date
Date
463

00—
CRU-
MSFac 4F
FUNEMQ:i� an
�:

AREA 2tL4 FUNDWO AREA •
Ap
" fK-
La ?;NIX
IV
IA 0
ATP FUNDWQ AREA A >t LPP FUNDm
-4
Lflp
VU"Ly Lin C
g
Road
lei
....... qPOW.

Corridor
464

Right -of -Way Requirements - Standard Intersection with Four Lanes J

I YUCAIPA
ci I
BEI�f=4R4iN0 `COUNTY
r+

1. _
__
- .. , _ 7+- . I a;_ .•=
15 _�.
..
' COUNTY LINE ROAD_ - CITY BOUNDARY

RIVERSIDE COUNTY -

CITY OF YUWA
SAN BERNARDINO.000N7Y
ll
—
CITY BOUNDARY • — COUNTY LINE RD
— —
- , • - � = x.•=RIVERSIDE COUNTY CITY OF CALBAESA
.

CITY OF YUCAPA ry_,
SAN BERN*MO COUNTY
COUNTY LINE— RD

RIVERSDE COUNTY CITY OF CALYESA
iT
r-
SAN B6iNAPDN0 COUNTY -
COUNTY UNE RD_ CITY BOUNDARY
- - - - - - RI46MDE COUNTY CITY OF CALNESA - - - - - -
CITY OF-YUCAIPI -I + •11
SAN BERf1ARDINO COUNTY'

COUNTY UNE RD
MMMME STY CITY OF , y� _ — — - Standard Intersection ROW Requirements 465

Right -of -Way Requirements - Both Alternatives

CITY OF YUCAIPA
�- SAN BERNARDINO COUNTY
N
�!mom

COUNTY LINE ROAD CITY BOUNDARY
_ - " _ RIVERSIDE COUNTY
aTY OF YUCAIPA
SAN BERNARDINO. COUNTY
ZI --- - ..

CITY BOUNDARY _ _I _ COUNTY LINE RD _

RIVERSIDE COUNTY CITY OF CAIJMESA
CITY OF YUCAIPIk _

SAN BERNARDINO COUNTY-
}

COUNTY LINE RD

RIVERSIDE COUNTY CITY OF CAUMESA
i aTY OF YUCAPA
I SAN BERNARpINO COUNTY —
COUNTY UNE_ RD

RIVERSIDE COUNTY CITY OF CALIMESA
_ zI
o
J
c�i I
SAN BERHAf DINO COUNTY
COUNTY LINE RD_ CITY BOUNDARY

RIVERSIDE COUNTY CITY OF CAUMESA
Roundabout ROW Requirements 13,467 SF
Standard Intersection ROW Requirements _ 53,602 SF
466

Right -of -Way Requirements - Roundabout Alternative with Two Lanes CITY OF YUCAIPA _
v~T SAN ' BERNARDINO COUNTY
M
COUNTY UPC- ROAD _ CITY BOUNDARY _

RIVERSIDE COUNTY
CITY OF 1N6IPA
v~i SAN BERNARDINO, COUNTY
Ad
CITY OF_)UCAIF'I 1 i
SAN Ii*MDINO C�NTY' -j v~i
ZI J
r
COUNTY LINE_ RD 00

RIVERSIDE COUNTY CITY OF CAUMESA
COUNTY UNE_ RD

RIVERSIDE COUNTY CITY OF CALIMESA

SAN BERNARDINO COUNTY

COUNTY UNE RD CITY BOUNDARY

RIVERSIDE COUNTY CITY OF CAUMESA
�I
CERoundabout ROW Requirements
467

Right of Way and Construction Cost Comparison — 2 Lanes vs 4 Lanes Roundabout Alternative
with 2 Lanes on
County Line Road
Standard Intersection Alternative
with 4 Lanes on
County Line Road
Right -of -Way Cost
$829,998
$1,771,506
Construction Costs
1/462/278
2,7671870
Total Estimated Cost
$2,292,276
$4,539,376
Right-of-way and construction costs are based on the unit costs in the City's current Development Impact fee Program 468

u
t4
-74
V7 r
•LPP PJM..,i, r,�,
AREA •-ND— AREA
ATP RMMQ AREA AF"_ AFEA
4-
own 4
1� v,
1w
10 70
p ATP R.W4CW4a AfEA FMCM0 AFEA

I FGENM
EXST. STOX CHAHtE1/CREEK

COUNTY BOUNDARY
two P� L� FUMDr
Cay OF CZL
469

← All documents from this meeting