08/26/2024 City Council Agenda 348

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
B-3
Oak Tree Design Guidelines. During final design the applicant will Future Project Applicant's
During Final Design
City of Yucaipa Planning
provide design guidelines as set forth in the Oak Tree Conservation Qualified Biologist and/or
Division
Ordinance. Section 89.0501 of the Yucaipa Development Code Arborist
provides design guidelines and evaluation criteria for projects that will impact or potentially impact oak trees. City of Yucaipa enforces the conservation of all healthy oak trees unless reasonable and conforming use of the property justifies removal, cutting, pruning and/or encroachment into the protected zone of an oak tree. To the extent possible, given the constraints of the property, the project must (1) preserve or minimize impacts to existing healthy oak trees; (2) eliminate or minimize encroachment or new construction in areas of oak trees; (3) minimize the percentage of encroachment from construction on oak trees; (4) avoid locating parking facilities and pedestrian walkways in close proximity to hazardous oak trees for safety reasons, unless it can be demonstrated that major surgery and a nutrient feeding program will restore the tree to a safe and vigorous condition, or the trees are located in minimal access areas such as drainages or steep slopes.

B-4
Oak Tree Mitigation. The applicant will mitigate oak tree impacts Future Project Applicant's
Prior to Relocation and/or
City of Yucaipa Planning
through relocation and/or replacement through habitat creation, Arborist and/or
Replacement of Oak Trees
Division
restoration, and enhancement efforts. Requests for relocations can Construction Contract
be processed administratively only when the diameter of the tree does not exceed six inches when measured at a point 4.5 feet above the natural grade of the tree. Requests for relocation of trees with larger diameters must be processed and reviewed by the Yucaipa Planning Commission and the City Council. Any
replacement trees from a nursery must be either coast live oak or valley oak (Quercus lobata). Other oak tree varieties must be approved in advance by the Community Development Department.

All relocated or replaced trees shall be monitored and maintained by a qualified biologist for five years or until the plants have become fully established and can survive without supplemental irrigation.

M,y 2024 Page 17
08/26/2024 City Council Agenda 349

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
B-5
Fuel Management Zone. A plan for the management of the fuel Future Project Applicant's
Prior to Issuance of
City of Yucaipa Planning
management zone shall be developed and submitted to the City of Qualified Biologist
Grading Permit
Division
Yucaipa for review and approval prior to issuance of a grading permit. The management plan shall include access points, signage for trails and restricted uses, and appropriate fencing.

B-6
Focused Special -Status Plant Survey and Avoidance. Outside Future Project Applicant's
Prior to Ground -Disturbing
City of Yucaipa Planning
the focused survey area (see Figure 5.4-1, Biological Resources Qualified Biologist
Activities
Division
Study Area), a focused special -status plant survey shall be conducted prior to ground -disturbing activities. The survey shall be conducted for Nevin's barberry, smooth tarplant, Parry's spineflower, slender -horned spineflower, Santa Ana River woollystar, California satintail, Hall's monardella, salt spring checkerbloom, and San Bernardino aster, or as otherwise required by an updated habitat assessment conducted by a qualified biologist. Surveys shall occur at the appropriate time of year to capture the characteristics necessary to identify the taxon. Surveys shall be conducted consistent with California Native Plant Society, U.S. Fish and Wildlife Service, and California Department of Fish and Wildlife protocols and by a qualified botanist knowledgeable of the local flora. The results of the survey shall be summarized in a report and would be valid for two years. If no special -status plants are found during the survey, no further mitigation would be required.

If special -status plants are observed, the full extent of the occurrence of a special -status plant species within the survey area shall be recorded using GPS. The location of each special -status plant occurrence shall be mapped and number of individuals for each occurrence documented. The outer extent of each occurrence shall be flagged for avoidance (to the extent feasible).

For direct impacts to special -status plant species, one or a combination of the following strategies shall be implemented:
• Avoidance and Minimization. Impacts to special -status plant occurrences shall be avoided to the greatest extent possible and minimized where avoidance is not feasible. Where Project

Page 18 ends

08/26/2024 City Council Agenda 350

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
impacts to special -status plant species cannot be avoided, mitigation is required and is discussed further below.
• Salvage. If impacts to special -status plants cannot be avoided and it is feasible to effectively salvage the plants, a qualified ecologist shall develop a restoration and mitigation plan based on the life history of the species impacted, as necessary, to mitigate Project impacts. The plan shall include, at minimum, (a) collection/salvage measures for plants and/or seed banks to retain intact soil conditions and maximize success likelihood; (b) details regarding storage of plants and/or seed banks; (c) location of the proposed recipient site and detailed site preparation and plant introduction technique details for top soil storage, as applicable; (d) time of year that the salvage and replanting or seeding shall occur and the methodology of the replanting; (e) a description of the irrigation, if used; (f) success criteria; and (g) a detailed monitoring program, commensurate with the plan's goals.

B-7
Construction -Related Indirect Impacts to Biological Resources.

Future Project Applicant's
Prior to Issuance of a
City of Yucaipa Planning
Prior to issuance of a construction permit within 500 feet of Qualified Biologist
Construction Permit within
Division
proposed open space (conserved and non -conserved), suitable 500 feet of Proposed Open
habitat for special -status species with potential to occur in the Space
project site, aquatic resources, or sensitive vegetation communities, construction plans and conditions of approval shall include the following to address indirect impacts:
• Biological Monitoring. A qualified project biologist approved by the City of Yucaipa shall monitor ground -disturbing and vegetation -clearing activities for the duration of the project to ensure that practicable measures are being employed to avoid incidental disturbance of habitat, species of concern, and other sensitive biological resources outside the Project footprint. Once ground -disturbing and vegetation -clearing activities are complete, the project biologist shall conduct weekly checks to inspect construction, staking, or flagging see "Delineation of May 2024 Page 19
08/26/2024 City Council Agenda 351

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitorinq Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
Property Boundaries," below) and ensure that all applicable requirements from the mitigation measures are being upheld. • Worker Environmental Awareness Training. Prior to grading, a pre -construction meeting shall be required that includes a training session for Project personnel by a qualified biologist.

The training shall include (1) a description of the species of concern and its habitats; (2) the general provisions of the applicable regulations pertaining to biological resources, including the Endangered Species Act and the Clean Water Act; (3) the need to adhere to the provisions of the Endangered Species Act, the Clean Water Act, and other applicable
regulations; (4) the penalties associated with violating the provisions of the Endangered Species Act, Clean Water Act, and other applicable regulations; (5) the general measures that are being implemented to conserve the species of concern as they relate to the project; and (6) the access routes to the project site and the boundaries within which the project activities must be accomplished. Additionally, the training shall include the measures and mitigation requirements for the applicable resources. Copies of the mitigation measures and any required permits from the resource agencies will be made available to construction personnel and maintained in the construction site trailer, and be made available in alternate languages, if necessary.
• Delineation of Property Boundaries. Before beginning
activities that would cause impacts, the contractor shall, in consultation with the biological monitor, clearly delineate the boundaries within which the impacts will take place with fencing, stakes, or flags, consistent with the grading plan. All impacts outside the fenced, staked, or flagged areas shall be avoided, and all fencing, stakes, and flags shall be maintained until the completion of impacts in that area. In addition, any avoided environmental resources will be clearly delineated.

Page 20 ends

08/26/2024 City Council Agenda 352

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
• Standard Dust Control Measures. Standard dust control measures as per the South Coast Air Quality Management
District shall be implemented to reduce impacts on nearby plants and wildlife. Measures include controlling speed to 15 mph or less on unpaved roads, replacing ground cover in disturbed areas as quickly as possible, frequently watering active work sites, installing shaker plates, and suspending excavation and grading operations during periods of high winds.
• Stormwater Pollution Prevention Plan. Prior to issuance of a grading permit for construction, the applicant shall submit a Stormwater Pollution Prevention Plan (SWPPP) to the City of Yucaipa that specifies best management practices to prevent all construction pollutants from contacting stormwater, with the intent of keeping sedimentation or any other pollutants from moving off -site and into receiving waters. The requirements of the SWPPP shall be incorporated into design specifications and construction contracts. Best management practices categories employed on -site would include erosion control, sediment control, and non-stormwater (good housekeeping). Best
management practices recommended for the construction phase shall include, but not be limited to:
— Limit grading to the minimum area necessary for
construction, operation, and decommissioning of the Project — Limit vegetation disturbance/removal to the maximum extent practicable
— Implement fiber rolls and sandbags around drainage areas and the site perimeter
— Stockpile and dispose of demolition debris, concrete, and soil properly
— Install a stabilized construction entrance/exit, and stabilize disturbed areas
May 2024 Page 21
08/26/2024 City Council Agenda 353

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitorinq Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
— Ensure proper protections for fueling and maintenance of equipment and vehicles
— Manage waste, aggressively controlling litter, and
implementing sediment controls.
— Stabilize soil in disturbed areas by revegetation.

The following water quality measures will be included in the SWPPP:
— Erodible fill material shall not be deposited into water courses. Brush, loose soils, or other similar debris material shall not be stockpiled within the stream channel or on its banks.
— Projects shall be designed to avoid the placement of
equipment and personnel within the stream channel or on sand and gravel bars, banks, and adjacent upland habitats used by target species of concern, as feasible. Projects that cannot be constructed without placing equipment or
personnel in sensitive habitats shall be timed to avoid the breeding season of riparian species.
— When stream flows must be diverted, the diversions shall be conducted using sandbags or other methods requiring
minimal instream impacts. Silt fencing or other sediment trapping materials shall be installed at the downstream end of construction activity to minimize the transport of sediments off site. Settling ponds where sediment is collected shall be cleaned out in a manner that prevents the sediment from reentering the stream. Care shall be exercised when
removing silt fences, as feasible, to prevent debris or sediment from returning to the stream.
— Water pollution and erosion control plans shall be developed and implemented in accordance with the Regional Water
Quality Control Board.

Page 22 ends

08/26/2024 City Council Agenda 354

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
to ensure that the quantity and quality of runoff discharged is not altered in an adverse way when compared with existing
conditions. In particular, measures shall be put in place to avoid discharge of untreated surface runoff from developed and paved areas into proposed open space or suitable habitat for special - status species. Stormwater systems shall be designed to prevent the release of toxins, chemicals, petroleum products, exotic plant materials, or other elements that might degrade or harm biological resources or ecosystem processes. This can be accomplished using a variety of methods including natural detention basins, grass swales, or mechanical trapping devices.

Runoff control systems shall receive regular maintenance to ensure their effective operations.
• Toxicants. Land uses that use chemicals or generate
bioproducts such as manure, fertilizer, or vineyard waste that are potentially toxic or may adversely affect plant species, wildlife species, habitat, or water quality shall incorporate measures to ensure that application of such chemicals does not result in discharges. Measures such as those employed to address
drainage issues shall be implemented.
• Lighting. Night lighting shall be directed away from proposed open space and/or suitable habitat for special -status species to protect species from direct night lighting. Shielding shall be incorporated in Project designs to ensure ambient lighting is not increased. Any trails that intersect proposed open space will not include night lighting.
• Noise: Proposed noise -generating land uses affecting suitable habitat for special -status species shall incorporate setbacks, berms, or walls to minimize the effects of noise on resources pursuant to applicable rules, regulations, and guidelines related to land use noise standards. For planning purposes, wildlife should not be subject to noise that would exceed residential noise standards.

Page 24 ends

08/26/2024 City Council Agenda 356

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitorinq Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
• Invasive Species. When approving landscape plans for future development, emphasis will be placed on using native species that occur in the region. Invasive, nonnative plant species listed on the most recent California Invasive Plant Council inventory ( https://www.cal-ipc.org/plants/inventory/) with a rating of moderate or high shall not be included in landscaping.
• Barriers. Future.development shall incorporate barriers, where appropriate in individual project designs, to minimize
unauthorized public access, domestic animal predation, illegal trespass, or dumping in proposed open space and/or suitable habitat for special -status wildlife. Such barriers may include native landscaping, rocks/boulders, fencing, walls, signage, and/or other appropriate mechanisms. Any proposed trails through open space will have gates that close at nighttime as well as signage and appropriate barriers to keep people and domestic animals on the trail.
• Restoration of Temporary Impacts. Prior to issuance of a grading or construction permit within the Project, grading and construction plans shall include the following note regarding any temporary impacts to uplands:
— Site construction areas subjected to temporary ground disturbance in undeveloped areas shall be subjected to
revegetation with an application of a native seed mix, if necessary, prior to or during seasonal rains to promote passive restoration of the area to pre -Project conditions (except that no invasive plant species will be restored). An area subjected to "temporary" disturbance means any area that is disturbed but will not be subjected to further
disturbance as part of the Project. If any grading occurred in areas intended to remain undeveloped, the site will be
recontoured to natural grade. This measure does not apply to situations in urban/developed areas that are temporarily impacted and will be returned to an urban/developed land use. Prior to seeding temporary round disturbance areas, May 2024 Page 25
08/26/2024 City Council Agenda 357

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
the Project biologist will review the seeding palette to ensure no seeding of invasive plant species, as identified in the most recent version of the California Invasive Plant Inventory for the region.

B-9
Pre -construction Pond Check for Western Spadefoot. A pre- Future Project Applicant's
Prior to Rainy Season,
City of Yucaipa Planning
construction pond check by a qualified biologist shall occur within Qualified Biologist
Before Stary of
Division
the construction area prior to the rainy season before start of Construction
construction activities. If no potential habitat for western spadefoot is found during the survey, no further mitigation would be required.

If potential habitat for western spadefoot is identified, construction fencing appropriate for amphibian exclusion will be installed around the construction area. A pre -construction pond check and focused survey for western spadefoot will be conducted the winter prior to grading activities in the construction area. The pond check will occur within 24 hours of the winter season's first three rain events and prioritize ponded features that hold water for 45 days or greater.

Ideally, these rain events would produce a minimum of 0.2 inch during a 24-hour period.

If western spadefoot are detected during surveys in the fenced construction footprint, then biologists shall collect western spadefoot adults from areas within 300 feet of known occupied pools. Adults shall be relocated outside of the construction footprint to portions of the conserved open space (see Mitigation Measure B-10, Wildlife Movement) that have suitable breeding habitat and few or no western spadefoot individuals. Relocation of western spadefoot will follow the latest amphibian handling guidelines provided by the U.S.

Geological Survey.

Pgge 26 Placelrlonk.r
08/26/2024 City Council Agenda 358

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
B-10
Wildlife Movement. Future development of the Project outside of Future Project Applicants
Prior to and During
City of Yucaipa Planning
the Pacific Oaks Commerce Center will prioritize the configuration of and City of Ontario
Operation
Division
open space such that Yucaipa Creek (NWW-01), Oak Glen Creek (conservation easement)
(NWW-02), and Yucaipa Creek's tributary (NWW-03) are able to support move -through streambed and upland habitat for wildlife.

Approximately 155 acres will be placed under long-term protection (i.e., conservation easement or other protective mechanism, such as the donation of land to the City for maintaining permanent open space), with configuration generally consistent with the Land Use Plan (Figure 3-7, Proposed Land Use Plan, of this SEIR).

The following conditions will be implemented among the land use categories outlined in Figure 3-7:
• Agricultural Tourism (AT): The existing Live Oak Canyon Farm will not change from existing condition as a part of the Specific Plan. Existing condition includes full avoidance of Yucaipa Creek by farm operations. Live Oak Canyon Farm will continue to avoid Yucaipa Creek.
• Planning Area C 6: Commercial development associated with C-6 will avoid Yucaipa Creek's tributary (NWW-03) and be clustered to leave a sufficient buffer from the existing drainage to allow for wildlife movement.
• Planning Area PA 11: Residential development associated with PA 11 will avoid Yucaipa Creek's tributary (NWW-03) and be clustered to leave a sufficient buffer from the existing drainage to allow for wildlife movement.
• Planning Area BP 4: Business park development in BP 4 will avoid Yucaipa Creek (NWW-01) and be clustered to leave a sufficient buffer from the existing drainage to allow for wildlife movement.

Throughout the conserved open space, the following measures will be implemented:
• Lighting will be directed toward development and shielded away from the open space.

May 2024 Page 27
08/26/2024 City Council Agenda 359

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
• Trails will not be in use from dusk to dawn, pets must be on leashes, and the trails will only be used for hiking.
• Trails may be temporarily closed to control unauthorized access.

Future development must be consistent with the City of Yucaipa General Plan Environmental Impact Report, which includes the following design standards for habitat connectivity:
• Adhere to low density zoning standards
• Encourage clustering of development
• Avoid known sensitive biological resources
• Provide shielded lighting adjacent to sensitive habitat areas • Encourage development plans that maximize wildlife movement • Provide buffers between development and wetland/riparian areas
• Protect wetland/riparian areas through regulatory agency permitting process
• Encourage wildlife -passable fence designs (e.g., three -strand barbless wire fence) on property boundaries
• Encourage preservation of native habitat on the undeveloped remainder of developed parcels
• Minimize road/driveway development to help prevent loss of habitat due to roadkill and habitat loss
• Use native, drought -resistant plant species in landscape design • Encourage participation in localiregional recreational trail design effort
B-11
Pre -construction Nesting Bird Survey. Construction activities Future Project Applicant's
During Construction
City of Yucaipa Planning
shall avoid the migratory bird nesting season (typically January 1 Qualified Biologist
Outside of Bird Nesting
Division
through September 30) to reduce any potential significant impact to Season
birds that may be nesting within the construction area. If construction activities must occur during the migratory bird nesting season, an avian nesting survey of the Protect site and within 500

Page 28 ends

08/26/2024 City Council Agenda 360

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
feet of all impact areas must be conducted to determine the presence/absence of fully protected species (including white-tailed kite), protected migratory birds, and active nests. The avian nesting survey shall be performed by a qualified wildlife biologist within 72 hours prior to the start of construction in accordance with the Migratory Bird Treaty Act and California Fish and Game Code Sections 3503, 3503.5, and 3513. If an active bird nest is found, the nest shall be flagged and mapped on the construction plans along with an appropriate buffer established around the nest, which will be determined by the biologist based on the species' sensitivity to disturbance (typically 300 feet for passerines and 500 feet for raptors and special -status species). The nest area shall be avoided until the nest is vacated and the juveniles have fledged. The nest area shall be demarcated in the field with flagging and stakes or construction fencing. On -site construction monitoring shall also be conducted when an active nest buffer is in place. No Project activities may encroach into established buffers without the consent of a monitoring biologist. The buffer shall remain in place until it is determined the nestlings have fledged and the nest is no longer considered active.

B-12
Pre -construction Burrowing Owl Surveys and Avoidance. One Future Project Applicant's
No More than 14 Days Prior
City of Yucaipa Planning
pre -construction burrowing owl survey shall be completed no more Qualified Biologist
to Site Preparation or
Division
than 14 days before initiation of site preparation or grading activities Grading Activities
and a second survey shall be completed within 24 hours of the start of site preparation or grading activities. If ground -disturbing activities are delayed or suspended for more than 30 days after the pre - construction surveys, the Project site shall be resurveyed. Surveys for burrowing owl shall be conducted in accordance with protocols established in the Staff Report on Burrowing Owl Mitigation, prepared by the California Department of Fish and Game (now California Department of Fish and Wildlife [CDFW]) in 2012 or current version.
• If burrowing owls are detected, a burrowing owl relocation plan shall be prepared and implemented in consultation with the City of Yucaipa. The relocation plan shall discuss the avoidance of May 2024 Page 29
08/26/2024 City Council Agenda 361

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
disturbance to burrows during the nesting season for burrowing owls (February 1 through August 31), as well as the appropriate buffers to be established around occupied burrows as
determined by a qualified biologist. No Project activities shall be allowed to encroach into established buffers without the consent of a monitoring biologist. The buffer shall remain in place until it is determined that occupied burrows have been vacated or the nesting season has completed.
• Outside of the nesting season, passive owl relocation techniques approved by CDFW shall be implemented. Owls shall be
excluded from burrows in the immediate project area, and within a buffer zone if there is a threat to the surface or subterranean burrow structure, by installing one-way doors in burrow entrances. These doors will be placed at least 48 hours prior to ground -disturbing activities. The Project area shall be monitored daily for one week to confirm owl departure from burrows prior to any ground -disturbing activities. Compensatory mitigation for permanent loss of owl habitat will be provided following the guidance in the CDFW 2012 Staff Report on Burrowing Owl Mitigation or current version.
• Where possible, burrows will be excavated using hand tools and refilled to prevent reoccupation. Sections of flexible plastic pipe shall be inserted into the tunnels during excavation to maintain an escape route for any wildlife inside the burrow.

B-13
Pre -construction Clearance Surveys. Pre -construction clearance Future Project Applicant's
Within 14 Days of Initiation
City of Yucaipa Planning
surveys for special -status wildlife shall be conducted by a qualified Qualified Biologist
of Ground Disturbance or
Division
Project biologist within 14 days of the initiation of ground Vegetation Clearing
disturbance or vegetation clearing within and adjacent to construction areas. Surveys shall be appropriate for detecting potentially occurring species, such as Dulzura pocket mouse, northwestern San Diego pocket mouse, Stephens' kangaroo rat, San Diego desert woodrat, Los Angeles pocket mouse, Southern California legless lizard, California glossy snake, coastal tiger whi tail, red diamondback rattlesnake, Blainville's horned lizard,

Page 30 ends

08/26/2024 City Council Agenda 362

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitorinq Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
and coast patch -nosed snake. Surveys need not be conducted in all areas simultaneously, as long as they are conducted within 14 days of the initiation of ground disturbance or vegetation clearing in each area individually. If special -status species are detected, appropriate buffers shall be established, necessary and appropriate for the species, unless it is not feasible to avoid the species. If possible, non -listed special -status wildlife species may be captured and relocated to suitable habitat nearby where they are safe from construction activities. Surveys and relocation of these species may only be conducted by the qualified Project biologist.
• If non -listed special -status reptiles or small mammals are detected, they will be moved out of harm's way.
• The project biologist shall remain available at all times after initiation of ground disturbance or vegetation clearing in case special -status wildlife species enter the construction area. If nonlisted special -status species are detected in the construction area after initiation of ground disturbance or vegetation clearing, the qualified Project biologist shall take measures to move the species, or encourage it to move, to a safe place away from construction activities.

B-14
Pre -construction Bat Survey and Avoidance. The Project Future Project Applicant's
At a Minimum, 1 Month
City of Yucaipa Planning
contains potentially suitable roosting and/or foraging habitat to Qualified Biologist
Prior to State of
Division
support western mastiff bat. Potential impacts to bats by the Project Construction
may occur through direct removal of occupied roosts or indirectly through the removal of suitable foraging habitat. To determine if bats are currently roosting or foraging on the Project site, and to determine the level of impact that may occur by the Project, the following measures shall apply.
• Pre -construction Survey. A pre -construction clearance survey for bats will be conducted at a minimum of one month prior to the start of construction to determine if any bats are currently roosting within buildings on the Project site. The pre -construction survey will consist of a daytime roost assessment by a qualified bat biologist to determine if any bats or signs of active roosting Maj, 2024 EX e 31
08/26/2024 City Council Agenda 363

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
are present. An emergence survey at dusk will be conducted after the roost assessment is completed to observe if any bats are emerging from suitable roost locations on the Project site.

Additionally, active and passive acoustic monitoring will be concurrent with the emergence survey to determine if any bats are echolocating within the Project site, identify the echolocating species, and determine the level of bat activity on site. Passive acoustic detectors will be deployed for a minimum of three nights. Once retrieved, bat echolocation calls will be analyzed off site using Sonobat software and manual vetting to identify calls to the species level. If no bats are observed during the pre - construction survey, the Project may commence without
potential impacts to bats. However, if bats are observed roosting in the Project site, additional measures will be required as follows.
— Maternity Roosting Season Avoidance. All Project -related activities, including bat roost exclusion, shall occur outside the general bat maternity roosting season of March through August. Roost exclusion must only occur during the time when bats are most active (early spring or fall) to increase the potential to exclude all bats from buildings and minimize the potential for a significant impact to occur by avoiding the maternity roosting season.
— Replacement Roost Installation. One month prior to the exclusion of bats from the buildings, the applicant will procure and install one or two bat boxes from a reputable vendor, such as Bat Conservation and Management, to allow bats
sufficient time to acclimate to a new potential roost location.

The bat boxes shall be installed within close proximity to the buildings and in an area that is within close proximity to suitable foraging habitat. The bat boxes will be oriented to the south or southwest, and the area chosen for the bat boxes must receive sufficient sunlight (at least six hours) to allow the bat boxes to reach an optimum internal temperature
(approximately 907E to mimic the existing bat roost. The bat

Page 32 ends

08/26/2024 City Council Agenda 364

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
boxes will be suitable to house crevice -roosting bat species, including Mexican free -tailed bat, and large enough to contain a minimum of 50 bats (e.g., Four Chamber Premium Bat House). The bat boxes shall be installed on a 20-foot pole in an area that will be preserved by the Project.
— Roost Exclusion. Approximately one month after bat boxes have been installed, exclusion of the existing roost within the buildings will occur. The primary exit points for roosting bats will be identified, and all secondary ingress/egress locations on the buildings will be covered with a suitable material (e.g., tarp or wood planks) to prevent bats from leaving from other locations. The primary exit point will remain uncovered to allow exclusion devices to be installed. Exclusion devices will consist of plastic sheeting or a screen (with mesh one -sixth of an inch or smaller) installed at the top and allowing bats to leave but not return. The exclusion devices will be installed at night to increase the potential that bats have already left the roost and are less likely to return. Exclusion devices will be left in place for one week to ensure any remaining bats in the buildings are excluded. A passive acoustic monitoring
detector will also be deployed during the exclusion period to verify excluded species and monitor if bat activity has decreased during the exclusion period. Periodic monitoring during the exclusion period shall also be conducted to
observe if any bats are still emerging from the buildings, and an active monitoring survey shall be conducted on the final night of exclusion to ensure no bats are emerging from the buildings and determine exclusion has been successful. Any continued presence of roosting bats will require an
adjustment to the exclusion devices and schedule.

May 2024 Page 33
08/26/2024 City Council Agenda 365

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitorinq Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
B-15
Pre -construction American Badger Survey and Avoidance.

Future Project Applicant's
During the Colder Months,
City of Yucaipa Planning
Impacts to American badger individuals and wintering and natal Qualified Biologist
No Earlier Than 14 Days
Division
dens shall be avoided and minimized during construction activities Prior to Construction
through the following measures.

Activities
• Pre -construction Surveys (Wintering). During the colder months (generally between November 1 and February 15, when daily temperatures do not exceed 457), pre -construction surveys shall be conducted by the Project biologist in suitable habitat no earlier than 14 days prior to construction activities to determine whether American badger winter dens are present within the construction zone or within 100 feet of the construction zone boundary.
• Avoidance Measures (Wintering). If an American badger winter den is occupied within the construction zone or within 100 feet of the construction zone, the den location shall be clearly marked with fencing or flagging in a manner that does not isolate the badger from intact adjacent habitat or prevent the badger from accessing the den, to avoid inadvertent impacts on the den.

If it is not practicable to avoid the wintering den during construction activities, an attempt will be made to trap or flush the individual and relocate it to suitable open space habitat.

Additionally, badgers can be relocated by slowly excavating the burrow, either by hand or mechanized equipment under the direct supervision of the Project biologist, removing no more than four inches at a time. After necessary trapping, flushing, or burrow excavation is completed, construction may proceed and the vacated winter den may be collapsed. If trapping is required, trapping will be limited to November 16 through the last day of February in accordance with Section 461, Title 14 of the California Code of Regulations (14 CCR 461). A written report documenting the badger removal shall be provided to the California Department of Fish and Wildlife within 30 days of relocation.

Page 34 ends

08/26/2024 City Council Agenda 366

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
• Pre -construction Surveys (Natal Dens). During the late winter and summer (generally from March 15 through July 31), when American badgers may use natal dens for birthing and pup rearing, pre -construction surveys shall be conducted by the Project biologist no earlier than 14 days prior to ground - disturbing construction activities to determine whether American badger natal dens are present within the Project construction zone or within 200 feet of the construction zone.
• Avoidance Measures (Natal Dens). If natal dens are detected during construction, construction activities shall be halted within 200 feet of the natal den. This buffer may be reduced based on the location of the den or type of construction activity, and at the direction of the project biologist. Construction activities shall not preclude the ability of the documented badgers to disperse to on -site open space or off -site habitat when the natal den is vacated (i.e., habitat suitable for dispersal must be maintained until dispersal occurs). Construction will be postponed or halted in these areas until it is determined by the Project biologist that the young are no longer dependent on the natal den. To avoid inadvertent impacts during construction and to ensure that construction activities are at least 200 feet from active natal dens, any active natal dens within the survey area shall be clearly marked with fencing or flagging in a manner that will not inhibit normal behavioral activities (e.g., foraging and dispersing from the site) by the mother and pups.

B-16
Pre -construction Survey for Crotch Bumble Bee. A pre-
Future Project Applicant's
During Primary Flight
City of Yucaipa Planning
construction survey for Crotch bumble bee (Bombus crotchii) shall Qualified Biologist
Period for Workers and
Division
occur within the construction area during the primary flight period for Males (April 1 through
workers and males (April 1 through August 31) and prior to the start August 31) and Prior to
of construction activities. The survey shall ensure that no nests for Construction
Crotch bumble bee are within the construction area. Crotch bumble bee is a habitat generalist, ground -nesting bee. Surveys and other relevant recommendations will be in accordance with the most recent protocol available at the time of the surveys.

May 2024 Page 35
08/26/2024 City Council Agenda 367

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
In the event an Incidental Take Permit is needed, mitigation for direct impacts to Crotch bumble bee will be fulfilled through compensatory mitigation at a minimum 1:1 nesting habitat replacement of equal or better functions and values to those impacted by the Project, or as otherwise determined through the Incidental Take Permit process. Mitigation will be accomplished either through off -site conservation or through a mitigation bank approved by the California Department of Fish and Wildlife. If mitigation is not purchased through a mitigation bank, and lands are conserved separately, a cost estimate will be prepared to estimate the initial start-up costs and ongoing annual costs of management activities for the management of the conservation easement area(s) in perpetuity. The funding source will be in the form of an endowment to help the qualified natural lands management entity that is ultimately selected to hold the conservation easement(s). The endowment amount will be established following the completion of a Project -specific Property Analysis Record to calculate the costs of in -perpetuity land management. The Property Analysis Record will take into account all management activities required in the Incidental Take Permit to fulfill the requirements of the conservation easement(s), which are currently in review and development.

B-17
Burrowing Owl Protocol Survey. A protocol burrowing owl survey Future Project Applicant's
Prior to Ground -Disturbing
City of Yucaipa Planning
shall be conducted by a qualified biologist outside the focused Qualified Biologist
Activities
Division
survey area (see Figure 5.4-1, Biological Resources Study Area) prior to ground -disturbing activities. Surveys shall be conducted in accordance with the California Department of Fish and Game, (now California Department of Fish and Wildlife), 2012 Staff Report on Burrowing Owl Mitigation or current version. The results of the survey shall be summarized in a report and will be valid for a maximum of two years. If no burrowing owl are found during the survey, no further mitigation would be required; however, the Project must comply with Mitigation Measure B-12, Pre -construction Burrowing Owl Surveys and Avoidance.

Page 36 ends

08/26/2024 City Council Agenda 368

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
If burrowing owl are detected, the full extent of the occurrence of occupied burrowing owl habitat in the survey area shall be recorded using GPS. The outer extent of each occurrence shall be flagged for avoidance (to the extent feasible).

Direct impacts to burrowing owl shall be avoided to the greatest extent possible and minimized where avoidance is not feasible.

Where Project impacts to burrowing owl cannot be avoided, a burrowing owl protection plan will be prepared and implemented, as summarized in Mitigation Measure B-12.

B-18
Least Bell's Vireo Protocol Survey. A focused habitat assessment Future Project Applicant's
Prior to Ground -Disturbing
City of Yucaipa Planning
shall be conducted for future development outside of the focused Qualified Biologist
Activities
Division
survey area (see Figure 5.4-1, Biological Resources Study Area). If suitable habitat is present, a protocol least Bell's vireo survey shall be conducted by a qualified biologist within suitable riparian habitat prior to ground -disturbing activities. Surveys shall be conducted in accordance with the U.S. Fish and Wildlife Service (USFWS) 2001 Least Bell's Vireo Survey Guidelines, or current version. The results of the survey shall be summarized in a report and valid for a maximum of two years. If no least Bell's vireo are found during the survey, no further mitigation would be required.

If least Bell's vireo are detected, the Project shall receive authorization for take of least Bell's vireo from USFWS through the 'federal Endangered Species Act Incidental Take Permit process, including the preparation of a Biological Assessment. Any measures determined to be necessary through the Incidental Take Permit process to offset impacts to least Bell's vireo may supersede measures provided in this California Environmental Quality Act document and shall be incorporated into the habitat mitigation and monitoring plan.

Mitigation for direct impacts to least Bell's vireo will be fulfilled through compensatory mitigation at a 2:1 habitat replacement of M ), 2024 Page 37
08/26/2024 City Council Agenda 369

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitorinq Requirements — Specific Plan Miti ation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
equal or better function and value as the habitat impacted by the project, or as otherwise determined through the Incidental Take Permit process. Mitigation will be accomplished either through off - site conservation or through a mitigation bank approved by USFWS.

If mitigation is not purchased through a mitigation bank and lands are conserved separately, a cost estimate will be prepared to estimate the initial start-up costs and ongoing annual costs of management activities for the management of the conservation easement area(s) in perpetuity. The funding source will be in the form of an endowment to help the qualified natural lands management entity that is ultimately selected to hold the conservation easement(s). The endowment amount will be
established following the completion of a Project -specific Property Analysis Record to calculate the costs of in -perpetuity land management. The Property Analysis Record will take into account all management activities required in the Incidental Take Permit to fulfill the requirements of the conservation easement(s), which are currently in review and development.

B-19
Aquatic Resource Avoidance, Permitting, and Protection. The Future Project Applicant's
Prior to Construction
City of Yucaipa Planning
Specific Plan area supports aquatic resources that are considered Qualified Biologist
Division
jurisdictional under the U.S. Army Corps of Engineers (USACE), the Regional Water Quality Control Board (RWQCB), and the California Department of Fish and Wildlife (CDFW). If aquatic resources are fully avoided, no further mitigation would be required; however, the Project must comply with Mitigation Measure B-7 (Construction - Related Indirect Impacts to Biological Resources) and Mitigation Measure B-8 (Long -Term Indirect Impacts to Biological Resources).

If full avoidance is not possible, prior to construction activity, the applicant shall coordinate with USACE and the Santa Ana RWQCB (Region 8) to ensure conformance with the requirements of Section 404 and Section 401 of the Clean Water Act and the Porter — Cologne Water Quality Control Act. Prior to activity within CDFW- jurisdictional streambed or associated riparian habitat, the applicant shall coordinate with CDFW Inland Deserts Region 6 about P"ZW26/2024 City Council Agenda 3,j,'f6Irlorks

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
conformance to the Lake and Streambed Alteration permit requirements.

Future development shall mitigate to ensure no -net -loss of waters at a minimum of 1:1 with establishment or re-establishment credits for impacts on aquatic resources as a part of an overall strategy to ensure no net loss, or at a higher ratio if establishment or re- establishment credits are not available. Mitigation shall be completed through use of a mitigation bank or other applicant - sponsored mitigation. Final mitigation ratios and credits shall be determined in consultation with USACE, RWQCB, and/or CDFW based on agency evaluation of current resource functions and values and through each agency's respective permitting process.

Should applicant -sponsored mitigation be implemented, a habitat mitigation and monitoring plan shall be prepared in accordance with resource agency guidelines and approved by the agencies in accordance with the proposed program permits. The habitat mitigation and monitoring plan will include but is not limited to a conceptual planting plan including planting zones, grading, and irrigation, as applicable; a conceptual planting plant palette; a long- term maintenance and monitoring plan; annual reporting
requirements; and proposed success criteria. Any off -site applicant - sponsored mitigation shall be conserved and managed in
perpetuity.

B-20
Sensitive Upland Vegetation Avoidance and Mitigation. The Future Project Applicant's
Prior to Construction
City of Yucaipa Planning
Specific Plan area supports sensitive vegetation communities, Qualified Biologist
Division
including Menzies's golden bush scrub and Palmer's goldenbush scrub. Future development should avoid these communities. If sensitive upland vegetation communities are fully avoided, no further mitigation will be required.

If full avoidance is not possible, prior to construction activities, the applicant shall mitigate for direct impacts to sensitive vegetation communities at a 1:1 ratio through either a mitigation bank or applicant -responsible mitigation. If applicant -responsible mitigation is performed, a mitigation plan must be prepared. The mitigation May 2024 Page 39
08/26/2024 City Council Agenda 371

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitorinq Requirements — Specific Plan Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
plan shall include: (1) the mitigation type (e.g., preservation, creation); (2) location of mitigation; (3) evaluation of how the functions and values of the impacted vegetation communities will be mitigated; (4) an implementation plan; (5) maintenance
requirements; (6) monitoring requirements; (7) reporting requirements; (8) contingency measures; (9) long-term
management; and (10) funding assurances
B-21
Culvert Undercrossing. A wildlife undercrossing shall be Future Project Applicant's
During Construction
City of Yucaipa Planning
constructed where proposed improvements to Live Oak Canyon Qualified Biologist,
Division
Road and the future Wildwood Canyon Road interchange cross Construction Contractor
over Yucaipa Creek. The undercrossing will be designed sufficient to convey large, medium, and smaller -sized wildlife. The wildlife undercrossing shall utilize existing or manufactured topography.

The crossing shall be designed to provide an openness ratio (calculated as width times height divided by length in meters) equal to or greater than 0.6 with direct line of sight at both ends. The crossing shall have a raised floor and/or side platform to allow dry passage for wildlife when water is flowing. The design should consider the use of berms to protect the undercrossing from light and noise.

B-22
Tree Removal Permit. Prior to the issuance of grading permits, it Future Project Applicants
Prior to Issuance of
City of Yucaipa Planning
will be the responsibility of the Project applicant to obtain the Grading Permit
Division
necessary permits for removal of trees, including oak trees, as well as the removal of plants within 200 feet of a streambank. The Project applicant will provide the appropriate plot plan or other documentation required by the City of Yucaipa.

CULTURAL RESOURCES

AND TRIBAL CULTURAL RESOURCES
CR-1
Prior to the issuance of any grading permits in planning areas BP4 Future Project Applicant's
Prior to Issuance of Any
City of Yucaipa Planning
and development within the OS, the project proponent shall retain a (in BP4 or OS) Qualified
Grading Permits in
Division
qualified architectural historian, defined as meeting Secretary of the Architectural Historian
Planning Areas BP4 and
Interior Standards to carry out all mitigation measures related to Development Within OS
historical resources. A historic resources technical evaluation for resources P36-12607 and P36-12608 shall be prepared by the qualified architectural historian. The study shall evaluate the

Page 40 ends

08/26/2024 City Council Agenda 372

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
significance and data potential of the resources in accordance with these standards. Resources present on the proposed project site shall be evaluated for eligibility for the California Register of Historical Resources (CRHR); including buildings and structures. If the resource meets the criteria for listing on the CRHR (Pub. Res.

Code Section 5024.1, Title 14 CCR, Section 4852), a program detailing how such long-term avoidance or preservation is assured shall be developed and approved prior to conditional approval.

CR-2
Prior to the issuance of any permits allowing ground -disturbing Future Project Applicant's
Prior to Issuance of Any
City of Yucaipa Planning
activities, the project proponent/operator shall retain a Qualified Qualified Archaeologist
Permits Allowing Ground-
Division
Archaeologist, defined as an archaeologist meeting the Secretary of Disturbing Activities
the Interior's Standards for professional archaeology (U.S.

Department of the Interior, 2011), to carry out all mitigation measures related to archaeological resources. The contact information for this Qualified Archaeologist shall be provided to the City of Yucaipa's Planning Department prior to the commencement of any construction activities on -site. Further, the Qualified Archaeologist shall be responsible for ensuring employee training provisions are implemented during implementation of the Project:
• Prior to any ground disturbance, the Qualified Archaeologist, or their qualified designee, shall provide worker environmental awareness protection training to construction personnel for the protection of cultural (prehistoric and historic) resources. As part of this training, construction personnel shall be briefed on proper procedures to follow should unanticipated cultural resources be made during construction. New construction personnel shall also receive the worker environmental awareness protection training. • In the event that unanticipated cultural resources are encountered during any phase of project construction, all construction work within 50 feet of the find shall cease and the Qualified Archaeologist, in coordination with the City's Planning Department, shall assess the find for importance. Construction activities may continue in other areas. If the discovery is May 2024 Pine 41
08/26/2024 City Council Agenda 373

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
determined to not be significant by the Qualified Archaeologist, work will be permitted to continue in the area.
• If a find is determined to be important by the Qualified Archaeologist, they shall immediately notify the City's Planning Department. The City's Planning Department shall determine whether the resource is eligible for inclusion in the California Register of Historical Resources (CRHR). If the City determines the resource is eligible for inclusion on the CRHR, project redesign and preservation in place shall be the preferred means to avoid impacts to significant historical resources.
• Consistent with CEQA Guidelines Section 15126.4(b)(3)(C), if it is demonstrated that known resources (P36-000915, P36-
0012602, P36-0012604, and P36-0012605) and unanticipated finds cannot be avoided, the Lead Archaeologist, shall develop additional treatment measures in consultation with the City, which may include placement within conservation easements, preservation -in -place (e.g. capping sites with sterile, chemically neutral soil, geofabric, and some form of shallow -rooted landscaping), Phase II testing, Phase III data recovery or other appropriate measures. The City shall consult with appropriate Native American representatives in determining appropriate treatment for unearthed cultural resources if the resources are prehistoric or Native American in nature. Diagnostic
archaeological materials with research potential recovered during any investigation shall be curated at an accredited curation facility. The Lead Archaeologist shall prepare a report documenting evaluation and/or additional treatment of the resource. A copy of the report shall be provided to the City and to the South Central Coastal Information Center at California State University, Fullerton.
• If the cultural resource is identified as being potentially eligible for listing on either the NRHP or CRHR, and project designs cannot be altered to avoid impacting the site, a Phase III Data Recovery Program to mitigate project effects shall be initiated. A

Page 42 ends

08/26/2024 City Council Agenda 374

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
Data Recovery Treatment Plan detailing the objectives of the Phase III Program shall be developed and contain specific testable hypotheses pertinent to the Research Design and relative to the site(s) under study. The Phase II I Data Recovery Treatment Plan shall be submitted to the City's Planning Department, the appropriate Native American Band or Tribe, if applicable for review and comment prior to implementation of the Data Recovery Program. After Approval of the Treatment Plan, the Phase III Data Recovery Program for affected, eligible site(s) shall be completed. Typically, a Phase III Data Recovery Program involves the excavation of a statistically representative sample of the site(s) to preserve those resource values that qualify the site(s) as being eligible for listing on the NRHP/CRHR. The Phase III Data Recovery Report shall be
submitted to the City's Planning Department, the appropriate Native American Band or Tribe, if applicable, and the SHPO for review and comment prior to the issuance of a grading permit.

CR-3
Prior to the issuance of a grading permit and before any brush Future Project Applicant's
Prior to Issuance of a
City of Yucaipa Planning
clearance, grading, excavation and/or ground disturbing activities on Qualified Archaeologist
Grading Permit and Before
Division
the site take place, the project proponent shall retain a Secretary of Any Brush Clearance,
Interior Standards qualified archaeological monitor to monitor all Grading, Excavation, and/or
ground -disturbing activities in native soils in an effort to identify any Ground -Disturbing Activities
unknown archaeological resources.

The project archaeologist, in consultation with interested tribes, the developer and the City of Yucaipa, shall develop an Archaeological Monitoring Plan (AMP) to address the details, timing and responsibility of all archaeological and cultural activities that will occur on the project site. Details in the AMP shall include:
• Project -related ground disturbance (including, but not limited to, brush clearing, grading, trenching, etc.) and development scheduling;
• The development of a rotating or simultaneous schedule in coordination with the developer and the project archeologist for May 2024 Page 43
08/26/2024 City Council Agenda 375

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
designated Native American Tribal Monitors from the consulting tribes during grading, excavation and ground disturbing activities on the site: including the scheduling, safety requirements, duties, scope of work, and Native American Tribal Monitors' authority to stop and redirect grading activities in coordination with all project archaeologists. Tribes shall coordinate as to Tribal Monitoring concurrent with development;
• The protocols and stipulations that the developer, City, Tribes and project archaeologist will follow in the event of inadvertent cultural resources discoveries, including any newly discovered cultural resource deposits that shall be subject to a cultural resources evaluation.
• Pursuant to the AMP, a tribal monitor from the consulting tribe (e.g., Morongo Band of Mission Indians, San Manuel Band of Mission Indians, and/or Soboba Band of Luiseno Indians) shall be present during the initial grading activities. If tribal resources are found during grubbing activities, the tribal monitoring shall be present during site grading activities
• During construction activities, the project proponent shall ensure that Native American monitors have access to the project site to monitor grading and excavation activities. If cultural resources are discovered during ground -disturbing activities, the Native American monitor shall have authority to halt all grading activities within a predetermined radius of the find until its significance can be evaluated.

GEOLOGY AND
SOILS
GS-1
Prior to issuance of a building permit, as per existing City policies, Future Project Applicant's
Prior to Issuance of
City of Yucaipa Planning
geotechnical studies shall be prepared at the time specific Qualified Geologist
Building Permit, and Prior
Division
development projects are proposed to address site specific to Design and Construction
geotechnical considerations. The scope of each geotechnical study is based on the underlying geotechnical conditions of the individual site.

Page 444 ends

U/26/2024 City Council Agenda 376

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
Prior to design and construction of any future developments within the project area, a comprehensive geotechnical evaluation, including development -specific subsurface exploration and laboratory testing, shall be conducted. The purpose of the subsurface evaluation is to:

1. Further evaluate the subsurface conditions in the area of proposed structures.

2. Provide specific data on potential geologic and geotechnical hazards.

3. Provide information pertaining to the engineering characteristics of earth materials in the project area.

From this data, recommendations for gradinglearthwork, surface, and subsurface drainage, temporary and/or permanent dewatering, foundations, pavement structural sections, and other pertinent geotechnical design considerations will be formulated and shall be included in the grading and building plans for individual developments. General recommendations are as follows.

1. Seismic Ground Shaking — Measures to prevent risk of loss, injury or death involving seismic ground shaking include constructing new development to the latest adopted building codes. In addition, new development should not be located near active earthquake faults.

2. Erosion or Loss of Topsoil — Erosion and sediment control measures shall be implemented as required by the City's Grading and Water Quality ordinances.

3. Where Expansive Soils Exist— Measures for the design of foundations, slabs, flatwork, and other improvements subject to damage from expansive soils.

4. For Potential Areas of Soil Subsidence or Lateral Spreading — measures to prevent subsidence due to dewatering or other groundwater withdrawals, and measures to prevent lateral spreading by appropriate load distribution, foundation
Maj, 2024 Page 45
08/26/2024 City Council Agenda 377

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
construction, pilings, retaining walls or other engineering controls.

Compliance with this measure shall be verified by the Community Development Department.

GS-2
Detailed geotechnical and hydrology reports shall be prepared prior Future Project Applicant's
Prior to Any Development
City of Yucaipa Planning
to any development approval or grading activities. These reports Qualified Geologist
or Ground -Disturbing
Division
shall specifically address erosion control and surface runoff for both Activities
construction and long-term operations on the site.

Recommendations contained in these reports to prevent soil erosion, siltation, and debris influx into the drainage system shall be implemented. Compliance with this measure shall be verified with the Community Development Department.

GS-3
All excavation activities in any and all areas identified as likely to Future Project Applicant's
During Ground -Disturbing
City of Yucaipa Planning
contain paleontological resources will be monitored by a qualified Qualified Paleontologist
Activities
Division
paleontological monitor. Paleontological monitors must be equipped to salvage fossils as they are unearthed and to remove samples of sediments that are likely to contain the remains of small fossil invertebrates and vertebrates. Monitors shall be empowered to temporarily halt all construction activity to allow removal of abundant or large specimens.

GS-4
All recovered paleontological specimens will be prepared to a point Future Project Applicant's
If Paleontological
City of Yucaipa Planning
of identification and permanent preservation, including washing of Future Project Applicant's
Resources are Discovered
Division
sediments to recover small specimens shall be conducted.

Qualified Paleontologist
Identification and full curation of all specimens into an established, accredited museum repository with permanent retrievable paleontological storage is required.

GREENHOUSE

GAS EMISSIONS
GHG-1
The City of Yucaipa shall require applicants of development projects Future Project Applicants,
Prior to Issuance of
City of Yucaipa Planning
to install electric vehicle (EV) spaces in compliance with the Tier 2 Construction Contractor
Certificate of Occupancy
Division
standards under Section A5.106.5.3.2 of the Non -Residential Voluntary Measures or Section A4.106.8.2.1 of the Residential Voluntary Measures, whichever is applicable, in the 2022 California Green Building Standards Code CALGreen . All site plans ]'age 46 PlaceWorks
08/26/2024 City Council Agenda 378

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
submitted to the City of Yucaipa Building and Safety Division shall illustrate compliance to either Section A5.106.5.3.2 or A4.106.8.2.1, whichever is applicable. In addition, the City of Yucaipa shall require applicants of development projects to include car/vanpool program with preferred parking and provide reserved preferential parking spaces for car -share, carpool, and ultra -low or zero emission vehicles.

Prior to issuance of the certificate of occupancy, the project applicant shall provide documentation to the City of Yucaipa Planning Division that verifies compliance with this measure.

GHG-2
The City of Yucaipa shall require applicants to design and construct Future Project Applicants,
Prior to Issuance of
City of Yucaipa Planning
all buildings to be all electric with electricity to be the only Construction Contractor
Building Permits (electric
Division
permanent source of energy for water -heating, mechanical and buildings) and Prior to
heating, ventilation, and air conditioning (HVAC) (i.e., space -heating Issuance of Certificate of
and space cooling), cooking, and clothes -drying. All major Occupancy (Energy Star
appliances (e.g., dishwashers, refrigerators, clothes washers and Appliances)
dryers, and water heaters) provided/installed are electric powered Energy Star certified or of equivalent energy efficiency where applicable. Prior to issuance of building permits, applicants shall provide plans that show the aforementioned requirements to the City of Yucaipa Planning Division. Prior to issuance of the certificate of occupancy, the City of Yucaipa Building & Safety Division shall verify installation of the electric -powered Energy Star or equivalent appliances.

See Mitigation Measures AQ-2 through and AQ-5, under Air Quality.

HYDROLOGY AND WATER QUALITY
HWQ-1
Grading shall be phased so that prompt revegetation or construction Future Project Applicant's
During Construction
City of Yucaipa Planning
will control erosion. Where possible, only those areas which will be Construction Contractor
Activities
Division
built on, resurfaced, or landscaped shall be disturbed.

HWQ-2
Spill containment systems shall consist of a system of dikes, walls, Future Project Applicants
Prior to issuance of
City of Yucaipa Planning
barriers, berms and/or other devices designed to contain the and Construction
Occupancy Permits
Division
spillage of the liquid contents of the containers stored in them and to Contractor
minimize the buildup of stormwater from precipitation, and run-on from roof drainage and outside areas. If the spill containment May 2024 Page 47
08/26/2024 City Council Agenda 379

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 5 Mitigation Monitoring Requirements — Specific Plan Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
system does not have a roof which covers the entire contained area, the spill containment system shall have the capacity to contain precipitation from at least a twenty-four (24), twenty-five (25) year rainfall event plus ten percent of the total volume of the material stored there or the volume of the largest container, whichever is greater. Spill containment systems shall also be constructed of impermeable and non -reactive materials to the liquids and/or wastes being contained.

HWQ-3
Spilled and/or leaked materials and/or wastes and any accumulated Future Project
During Operation
City of Yucaipa Planning
precipitation shall be removed from the spill containment system in Applicants/Tenants
Division and Future
as timely a manner as is necessary to prevent the overflow of the Building Owner/Operator
spill containment system. Unless otherwise approved in writing by the City Engineer, all chemicals or wastes discharged within the spill containment system shall be disposed of in accordance with all applicable federal, state, and local rules, regulations, and laws, and shall not be discharged into the public sanitary sewer system, stormwater drainage system or onto the ground.

TRIBAL CULTURAL RESOURCES
See Mitigation Measures CR-2 and CR-3, under Cultural Resources.

Page 48 ends

08/26/2024 City Council Agenda 380

Table 6

AESTHETICS

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Mitiqation Monitorinq Requirements — Pacific Oaks Commerce Center Monitor
Responsibility for Responsibility for (Signature Required) Mitigation Measure I Implementation I Timing Monitoring (Date of Compliance) AES-1
Prior to issuance of grading permits, lighting plans and signage Project Applicant
Prior to Issuance of
City of Yucaipa Planning
plans for new development shall be reviewed by the Community Grading Permits, Lighting
Division
Development Department to ensure that minimal light intrusion and Plans, and Signage Plans
spill over into adjacent residential areas occurs.

AES-2
Prior to issuance of grading permits, and during the Specific Plan Project Applicant
Prior to Issuance of
City of Yucaipa Planning
review process for future development in the Specific Plan site, the Grading Permits and During
Division
Director of Community Development shall ensure that mirrored and Review Process for Future
highly reflective surfaces are discouraged or, where proposed, shall Development
be accompanied by a design -level glare impact analysis that demonstrates no adverse visual impairment to motorists or other visual nuisance occurs.

AIR QUALITY
AQ-1
In accordance with South Coast Air Quality Management District Project Applicant's
During Construction
City of Yucaipa Planning
(AQMD) Rule 403, the City will require the following measures to be Construction Contractor
Division
taken during the construction of all future development projects on the Specific Plan Site associated with the proposed Specific Plan to reduce the amount of dust and other sources of PM10:
• Water exposed soils at least twice three times daily and maintain equipment and vehicle engines in good condition and in proper tune;
• Wash off trucks leaving development sites and water down all construction areas;
• Replace ground cover on construction sites if it is determined that the site will be undisturbed for lengthy periods;
• Reduce speeds on unpaved roads to less than 15 miles per hour;
• Halt all grading and excavation operations when wind speeds exceed 25 miles per hour;
• Properly maintain diesel -powered on -site mobile equipment; • Install particulate filters on off -road construction equipment; May 2024 Page 49
08/26/2024 City Council Agenda 381

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
• Sweep streets at the end of the day if substantial visible soil material is carried over to the adjacent streets;
• Cover all trucks hauling dirt, sand, soil or other loose material to and from the site;
• Limit truck construction traffic to non -peak times of the morning or afternoon;
• Use surfactants and other chemical stabilizers to suppress dust at construction sites; and
• Use wheel washers for construction equipment.

AQ-2
All appliances installed as part of future development projects shall Project Applicant,
Prior to Building Occupation
City of Yucaipa Planning
be energy efficient appliances (i.e., washers/dryers, refrigerators, Construction Contractor
Division
stoves, etc.).

AQ-4
Future development projects on the Specific Plan site shall install Project Applicant,
During Construction
City of Yucaipa Planning
Energy Star labeled roof materials.

Construction Contractor
Division
AQ-6
The City of Yucaipa shall require that applicants for new Project Applicant,
During Construction
City of Yucaipa Planning
development projects incorporate the following to reduce air Construction Contractor
Division
pollutant emissions during construction activities:
• Use construction equipment rated by the United States Environmental Protection Agency as having Tier 4 (model year 2008 or newer) Final or stricter emission limits, for engines between 50 and 750 horsepower. If Tier 4 Final equipment is not available, the applicant shall provide documentation or demonstrate its unavailability to the City of Yucaipa Building & Safety Division prior to the issuance of any construction permits. • Limit nonessential idling of heavy equipment for more than three minutes.
• Prohibit off -road diesel -powered equipment from being in the "on" position for more than 10 hours per day.
• Use electric -powered hand tools, forklifts, and pressure washers, and provide electrical hookups to the power grid rather than use of diesel -fueled generators to supply their power, as feasible.

Page 5008 ends

382

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
• Plans submitted for grading permit issuance and building permit issuance once grid power to the site is available, shall designate an area in the construction site where electric -powered construction vehicles and equipment can charge. The provision of temporary electric infrastructure for such purpose shall be approved by the utility provider, Southern California Edison (SCE). If SCE will not approve the installation of temporary power for this purpose, the establishment of a temporary electric charging area will not be required. If electric equipment will not be used on the construction site because the construction contractor(s) does not have such equipment in its fleet, the establishment of a temporary electric charging area also will not be required. If electric powered equipment is in the contractor(s) equipment fleet, and SCE approval is secured, the temporary charging location is required to be established upon issuance of grading permits and building permits.
• Outside of site preparation, limit the amount of daily grading disturbance area, as feasible.
• During construction, the construction contractor shall maintain a list of all operating equipment in use on the construction site for verification by the City of Yucaipa. The construction equipment list shall state the makes, models, Equipment Identification Numbers, Engine Family Numbers, and number of construction equipment on -site.
• Use paints with a VOC content that meets the South Coast Air Quality Management District Super Compliant architectural coatings standard of 10 grams per liter (g/L) or less for coating building architectural surfaces.
• Use paints with a VOC content of 50 g/L or less for parking areas and surfaces.
• Provide information on transit and ridesharing programs and services to construction employees.

May 2024 Page 51
08/26/2024 City Council Agenda 383

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitorinq Requirements — Pacific Oaks Commerce Center Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
• Provide meal options onsite or shuttles between the facility and nearby meal destinations for construction employees, as feasible.

These identified measures shall be incorporated into all appropriate construction documents (e.g., construction management plans) submitted to the City and shall be verified by the City's Planning Division
AQ-7
The City of Yucaipa shall require that project developer/facility Project Applicant,
During Construction
City of Yucaipa Planning
owner for new development projects that would use off -road Construction Contractor
Division
equipment (e.g., forklifts and yard trucks) in daily business operations only utilize zero -emissions off -road equipment. The project developer/facility owner shall disclose this requirement to all tenants/business entities prior to the signing of any lease agreement. In addition, the limitation to use only electric -powered off -road equipment shall be included all leasing agreements.

Prior to issuance of a Business License for a new tenant/business entity, the project developer/facility owner and tenant/business entity shall provide to the City of Yucaipa Planning Division and Business License Division, a signed document (verification document) noting that the project development/facility owner has disclosed to the tenant/business entity the requirement to use only electric -powered equipment for daily operations. This verification document shall be signed by authorized agents for the project developer/facility owner and tenant/business entities and the agreement shall be retained by the facility owner onsite. In addition, if applicable, the tenant/business entity shall provide documentation (e.g., purchase or rental agreement) to the City of Yucaipa Planning Division and Business License Division to verify, to the City's satisfaction, that any off -road equipment utilized will be electric - powered.

AQ-8
Only electric standby and/or hybrid electric transport refrigeration Project
During Operation
City of Yucaipa Planning
units (E/S TRUs) shall be utilized onsite for daily warehouse and Applicants/Tenants
Division and Building
business operations. All E/S TRUs shall comply with the California Owner/Operator
Air Resources Board's "Alternative Technology" requirements under Section 2477 e 1 A 3 of the California Code of Regulations, Title

Page 52 ends

08/26/2024 City Council Agenda 384

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
13, Article 8, Chapter 9, Division 3. The project developer/facility owner shall disclose this requirement to all tenants/business entities prior to the signing of any lease agreement. In addition, the limitation to use only E/S TRUs shall be included all leasing agreements.

AQ-9
All truck/dock bays that serve cold storage facilities within the Project Applicant,
Prior to Issuance of a
City of Yucaipa Planning
proposed buildings shall be electrified to facilitate plug-in capability Construction Contractor
Certificate of Occupancy
Division
and support use of electric standby and/or hybrid electric transport refrigeration units. All site and architectural plans submitted to the City of Yucaipa Planning Division shall note all the truck/dock bays designated for electrification. Prior to the issuance of a Certificate of Occupancy, the City of Yucaipa Building & Safety Division shall verify electrification of the designated truck/dock bays.

AQ-10
To reduce idling emissions from transport trucks, signage shall be Project Applicant,
During Construction
City of Yucaipa Planning
placed at truck access gates, loading docks, and truck parking Construction Contractor
Division
areas that identify applicable California Air Resources Board (CARB) anti -idling regulations (e.g., Rule 2485) and directional information to the nearest freeway on -ramps. At minimum, each sign shall include:1) instructions for truck drivers to shut off engines when not in use; 2) instructions for drivers of diesel trucks to restrict non -essential idling to no more than two consecutive minutes (compared to five minutes currently allowed under Rule 2485); and 3) telephone numbers of the building facilities manager and CARB to report violations. Directional text on the sign shall read "To Truck Route" with a directional arrow. All signage shall be made of weather-proof materials. Truck check -in points shall be inside the project site to ensure no trucks are queuing on local roadway. All site and architectural plans submitted to the City of Yucaipa Planning Division shall note the locations of these signs. Prior to issuance of the Certificate of Occupancy, the City of Yucaipa Building & Safety Division shall verify the installation of these signs.

In addition, the building owner shall implement the following measures:

MaUW2024 City Council Agenda 385Page 53

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitorina Reauirements — Pacific Oaks Commerce Center Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
• Occupants/tenants shall be provided documentation on the United States Environmental Protection Agency's SmartWay program.
• Occupants/tenants shall be provided documentation on funding opportunities, such as the Carl Moyer Program, that provide incentives for using cleaner -than -required engines and equipment.
• Occupants/tenants shall be provided information on efficient scheduling and load management to reduce unnecessary
queuing and idling of trucks.

AQ-11
The property manager/owner shall specify in all property Project Applicant,
During Operation
City of Yucaipa Planning
maintenance bids that the landscape maintenance contractor shall Construction Contractor
Division
only use electric -powered landscaping equipment in line with new requirements from the California Air Resources Board for small off - road engines. Prior to the issuance of a Certificate of Occupancy, the property manager/facility owner shall provide documentation (e.g., purchase, rental, and/or services agreement) to the City of Yucaipa Building and Safety Division that all landscaping equipment utilized will be electric -powered. The property manager/facility owner shall also provide the property landscaping maintenance schedule as part of this documentation. Prior to the issuance of a Certificate of Occupancy, the City of Yucaipa Building & Safety Division shall verify, to the City's satisfaction, that any landscaping equipment utilized will be electric powered.

AQ-12
The City of Yucaipa shall require the following measures for Future Project Applicants,
During plan check
City of Yucaipa Planning
warehouse facilities:

Construction Contractors
Division
• The buildings' electrical room shall be sufficiently sized to hold additional panels that may be needed to supply power for the future installation of electric vehicle (EV) truck charging stations on the site.
• Conduit shall be installed from the electrical room to tractor trailer parking spaces in logical location(s) on the site determined by the project applicant during construction

Page 54 ends

08/26/2024 City Council Agenda 386

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
document plan check, for the purpose of accommodating the future installation of EV truck charging stations at such time this technology becomes commercially available and the buildings are being served by trucks with electric -powered engines. • If there are domiciled heavy-duty trucks (Class 7 and 8), the tenant/operator of the facility shall be required to provide EV truck charging facilities on site sufficient to charge the electric trucks domiciled on the site, and such facilities shall be made available for all electric trucks that use the facility, to the extent the applicable utility authorizes and has capacity to support.

All site and architectural plans submitted to the City of Yucaipa Planning Division shall note the electric charging requirements identified above.

BIOLOGICAL RESOURCES
B-1
Oak Tree Survey. Prior to grading the applicant will conduct an oak Project Applicant's
Prior to Grading
City of Yucaipa Planning
tree survey to identify oak trees to be encroached upon, removed Qualified Biologist and/or
Division
and/or relocated, and those within 100 feet of the project site or Arborist
construction area. Oak trees will be identified, located, and tagged during the survey. An oak tree report may be required depending on the scope and the nature of the project impact on the surrounding trees, as determined during the pre -application conference. In general, the requirements for an oak tree report may be waived in situations involving the removal of dead or hazardous trees and/or potential impacts to less than four trees. In situations requiring the submission of an oak tree report, the document shall be certified by the oak tree consultant to be true and correct and must be acceptable to the Community Development Director (Yucaipa Development Code Section 89.0501). The oak tree report will include information on the oak trees proposed for impacts, including location, diameter of trunk, diameter of canopy, height, and the health and condition of the subject oak trees. In addition, a site plan map must be submitted during the application process. The site plan map is required to show proposed grading and construction areas, oak tree locations, and the exact location of the dripline of an oak tree.

May 2024 Page SS
08/26/2024 City Council Agenda 387

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
B-2
Oak Tree Permit. Prior to the removal of, or the encroachment into, Project Applicant's
Prior to Removal of, or
City of Yucaipa Planning
the "protected zone' of oak trees, the applicant will first obtain an Qualified Biologist and/or
Encroachment Into, the
Division
oak tree permit as stated in section 89.0515 (b) (1) of the Yucaipa Arborist
Protected Zone of Oak
Development Code. Specifically, the protected zone for oak trees is Trees
defined as the area within a circumference measured five feet outside of the dripline of the tree and extending inwards to the trunk of the tree, with the condition that the protected zone must always be at least 15 feet from the trunk of an oak tree (Yucaipa Development Code Section 89.0501). The applicant will obtain oak tree permits to allow encroachments within the dripline as needed.

Requests for encroachments that do not exceed 50 percent of the dripline would qualify for administrative processing, whereas, requests for encroachments that exceeds 50 percent of the dripline would require Yucaipa Planning Commission review. (The
guidelines of the Oak Tree Conservation Ordinance explain the processing steps involved in obtaining an oak tree permit, the information necessary to apply for an oak tree permit, the standard conditions for an oak tree permit, oak tree survey and reporting requirements, oak tree removal requirements, oak tree planting and replacement requirements, and the enforcement of the Oak Tree Conservation Ordinance).

B-3
Oak Tree Design Guidelines. During final design the applicant will Project Applicant's
During Final Design
City of Yucaipa Planning
provide design guidelines as set forth in the Oak Tree Conservation Qualified Biologist and/or
Division
Ordinance. Section 89.0501 of the Yucaipa Development Code Arborist
provides design guidelines and evaluation criteria for projects that will impact or potentially impact oak trees. City of Yucaipa enforces the conservation of all healthy oak trees unless reasonable and conforming use of the property justifies removal, cutting, pruning and/or encroachment into the protected zone of an oak tree. To the extent possible, given the constraints of the property, the project must (1) preserve or minimize impacts to existing healthy oak trees; (2) eliminate or minimize encroachment or new construction in areas of oak trees; (3) minimize the percentage of encroachment from construction on oak trees; (4) avoid locating parking facilities and pedestrian walkways in close proximity to hazardous oak trees for safety reasons, unless it can be demonstrated that major surgery

Page 56 ends

08/26/2024 City Council Agenda 388

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
and a nutrient feeding program will restore the tree to a safe and vigorous condition, or the trees are located in minimal access areas such as drainages or steep slopes.

B-4
Oak Tree Mitigation. The applicant will mitigate oak tree impacts Project Applicant's
Prior to Relocation and/or
City of Yucaipa Planning
through relocation and/or replacement through habitat creation, Arborist and/or
Replacement of Oak Trees
Division
restoration, and enhancement efforts. Requests for relocations can Construction Contractor
be processed administratively only when the diameter of the tree does not exceed six inches when measured at a point 4.5 feet above the natural grade of the tree. Requests for relocation of trees with larger diameters must be processed and reviewed by the Yucaipa Planning Commission and the City Council. Any
replacement trees from a nursery must be either coast live oak or valley oak (Quercus lobata). Other oak tree varieties must be approved in advance by the Community Development Department.

All relocated or replaced trees shall be monitored and maintained by a qualified biologist for five years or until the plants have become fully established and can survive without supplemental irrigation.

B-5
Fuel Management Zone. A plan for the management of the fuel Project Applicant's
Prior to Issuance of
City of Yucaipa Planning
management zone shall be developed and submitted to the City of Qualified Biologist
Grading Permit
Division
Yucaipa for review and approval prior to issuance of a grading permit. The management plan shall include access points, signage for trails and restricted uses, and appropriate fencing.

B-7
Construction -Related Indirect Impacts to Biological Resources.

Project Applicant's
Prior to Issuance of a
City of Yucaipa Planning
Prior to issuance of a construction permit within 500 feet of Qualified Biologist
Construction Permit within
Division
proposed open space (conserved and non -conserved), suitable 500 feet of Proposed Open
habitat for special -status species with potential to occur in the Space
Project site, aquatic resources, or sensitive vegetation communities, construction plans and conditions of approval shall include the following to address indirect impacts:
• Biological Monitoring. A qualified project biologist approved by the City of Yucaipa shall monitor ground -disturbing and vegetation -clearing activities for the duration of the Project to ensure that practicable measures are being employed to avoid incidental disturbance of habitat, species of concern, and other sensitive biological resources outside the Project footprint. Once May 2024 Page 57
08/26/2024 City Council Agenda 389

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
ground -disturbing and vegetation -clearing activities are complete, the project biologist shall conduct weekly checks to inspect construction, staking, or flagging (see "Delineation of Property Boundaries," below) and ensure that all applicable requirements from the mitigation measures are being upheld. • Worker Environmental Awareness Training. Prior to grading, a pre -construction meeting shall be required that includes a training session for project personnel by a qualified biologist.

The training shall include (1) a description of the species of concern and its habitats; (2) the general provisions of the applicable regulations pertaining to biological resources, including the Endangered Species Act and the Clean Water Act; (3) the need to adhere to the provisions of the Endangered Species Act, the Clean Water Act, and other applicable
regulations; (4) the penalties associated with violating the provisions of the Endangered Species Act, Clean Water Act, and other applicable regulations; (5) the general measures that are being implemented to conserve the species of concern as they relate to the project; and (6) the access routes to the project site and the boundaries within which the project activities must be accomplished. Additionally, the training shall include the measures and mitigation requirements for the applicable resources. Copies of the mitigation measures and any required permits from the resource agencies will be made available to construction personnel and maintained in the construction site trailer, and be made available in alternate languages, if necessary.
• Delineation of Property Boundaries. Before beginning
activities that would cause impacts, the contractor shall, in consultation with the biological monitor, clearly delineate the boundaries within which the impacts will take place with fencing, stakes, or flags, consistent with the grading plan. All impacts outside the fenced, staked, or flagged areas shall be avoided, and all fencing, stakes, and flags shall be maintained until the

Page 58 ends

08/26/2024 City Council Agenda 390

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
completion of impacts in that area. In addition, any avoided environmental resources will be clearly delineated.
• Standard Dust Control Measures. Standard dust control measures as per the South Coast Air Quality Management
District shall be implemented to reduce impacts on nearby plants and wildlife. Measures include controlling speed to 15 mph or less on unpaved roads, replacing ground cover in disturbed areas as quickly as possible, frequently watering active work sites, installing shaker plates, and suspending excavation and grading operations during periods of high winds.
• Stormwater Pollution Prevention Plan. Prior to issuance of a grading permit for construction, the applicant shall submit a Stormwater Pollution Prevention Plan (SWPPP) to the City of Yucaipa that specifies best management practices to prevent all construction pollutants from contacting stormwater, with the intent of keeping sedimentation or any other pollutants from moving off site and into receiving waters. The requirements of the SWPPP shall be incorporated into design specifications and construction contracts. Best management practices categories employed on site would include erosion control, sediment control, and non-stormwater (good housekeeping). Best
management practices recommended for the construction phase shall include, but not be limited to:
— Limit grading to the minimum area necessary for
construction, operation, and decommissioning of the Project — Limit vegetation disturbance/removal to the maximum extent practicable
— Implement fiber rolls and sandbags around drainage areas and the site perimeter
— Stockpile and dispose of demolition debris, concrete, and soil properly
— Install a stabilized construction entrance/exit, and stabilize disturbed areas
May 2024 Page 59
08/26/2024 City Council Agenda 391

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
— Ensure proper protections for fueling and maintenance of equipment and vehicles
— Manage waste, aggressively controlling litter, and
implementing sediment controls.
— Stabilize soil in disturbed areas by revegetation.

The following water quality measures will be included in the SWPPP:
— Erodible fill material shall not be deposited into water courses. Brush, loose soils, or other similar debris material shall not be stockpiled within the stream channel or on its banks.
— Projects shall be designed to avoid the placement of
equipment and personnel within the stream channel or on sand and gravel bars, banks, and adjacent upland habitats used by target species of concern, as feasible. Projects that cannot be constructed without placing equipment or
personnel in sensitive habitats shall be timed to avoid the breeding season of riparian species.
— When stream flows must be diverted, the diversions shall be conducted using sandbags or other methods requiring
minimal instream impacts. Silt fencing or other sediment trapping materials shall be installed at the downstream end of construction activity to minimize the transport of sediments off site. Settling ponds where sediment is collected shall be cleaned out in a manner that prevents the sediment from reentering the stream. Care shall be exercised when
removing silt fences, as feasible, to prevent debris or sediment from returning to the stream.
— Water pollution and erosion control plans shall be developed and implemented in accordance with the Regional Water
Quality Control Board.

Page 60 ends

08/26/2024 City Council Agenda 392

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
• Minimize Spills of Hazardous Materials. All vehicles and equipment shall be maintained in proper condition to minimize the potential for fugitive emissions of motor oil, antifreeze, hydraulic fluid, grease, or other hazardous materials. Hazardous spills shall be immediately cleaned up, the contaminated soil shall be immediately cleaned up, and the contaminated soil shall be properly handled or disposed of at a licensed facility.

Servicing of construction equipment shall take place only at a designated staging area.
• Invasive Weeds. To reduce the spread of invasive plant species, landscape plants shall not be on the most recent version of the California Invasive Plant Council's California Invasive Plant Inventory (hUp:// www.cal-
ipc.org/ip/inventory/index.php).
• Night Work. All construction activities will be conducted during the daytime, and lights will not be kept on overnight in the construction area, as practicable. If night lighting is required during construction activities, all exterior lighting along undeveloped land shall be fully shielded and directed downward in a manner that will prevent light spillage or glare into the adjacent open space.

B-8
Long -Term Indirect Impacts to Biological Resources. Prior to Project Applicant's
Prior to Issuance of a
City of Yucaipa Planning
issuance of a construction permit within 500 feet of proposed open Qualified Biologist
Construction Permit within
Division
space (conserved and nonconserved), suitable habitat for special- 500 feet of Proposed Open
status species with potential to occur in the Project site, aquatic Space
resources, or sensitive vegetation communities, construction plans and conditions of approval shall include the following to address indirect impacts to special -status species:
• Runoff: Future development within 500 feet of proposed open space (conserved and non -conserved), suitable habitat for special -status species with potential to occur in the Project site, aquatic resources, or sensitive vegetation communities shall incorporate measures, including measures required through the National Pollutant Discharge Elimination System requirements, to ensure that the quantity and quality of runoff discharged is not M,y 2024 Pgge 69
08/26/2024 City Council Agenda 393

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
altered in an adverse way when compared with existing
conditions. In particular, measures shall be put in place to avoid discharge of untreated surface runoff from developed and paved areas into proposed open space or suitable habitat for special - status species. Stormwater systems shall be designed to prevent the release of toxins, chemicals, petroleum products, exotic plant materials, or other elements that might degrade or harm biological resources or ecosystem processes. This can be accomplished using a variety of methods including natural detention basins, grass swales, or mechanical trapping devices.

Runoff control systems shall receive regular maintenance to ensure their effective operations.
• Toxicants: Land uses that use chemicals or generate
bioproducts such as manure, fertilizer, or vineyard waste that are potentially toxic or may adversely affect plant species, wildlife species, habitat, or water quality shall incorporate measures to ensure that application of such chemicals does not result in discharges. Measures such as those employed to address
drainage issues shall be implemented.
• Lighting: Night lighting shall be directed away from proposed open space and/or suitable habitat for special -status species to protect species from direct night lighting. Shielding shall be incorporated in Project designs to ensure ambient lighting is not increased. Any trails that intersect proposed open space will not include night lighting.
• Noise: Proposed noise -generating land uses affecting suitable habitat for special -status species shall incorporate setbacks, berms, or walls to minimize the effects of noise on resources pursuant to applicable rules, regulations, and guidelines related to land use noise standards. For planning purposes, wildlife should not be subject to noise that would exceed residential noise standards.
• Invasive Species: When approving landscape plans for future development, emphasis will be placed on using native species that occur in the region. Invasive, nonnative plant species listed Page U/26/2024 City Council Agenda PlaceWorks
394

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
on the most recent California Invasive Plant Council inventory ( https://www.cal-ipc.org/plants/inventory/) with a rating of moderate or high shall not be included in landscaping.
• Barriers: Future development shall incorporate barriers, where appropriate in individual project designs, to minimize
unauthorized public access, domestic animal predation, illegal trespass, or dumping in proposed open space and/or suitable habitat for special -status wildlife. Such barriers may include native landscaping, rocks/boulders, fencing, walls, signage, and/or other appropriate mechanisms. Any proposed trails through open space will have gates that close at nighttime as well as signage and appropriate barriers to keep people and domestic animals on the trail.
• Restoration of Temporary Impacts: Prior to issuance of a grading or construction permit within the Project, grading and construction plans shall include the following note regarding any temporary impacts to uplands:
— Site construction areas subjected to temporary ground disturbance in undeveloped areas shall be subjected to
revegetation with an application of a native seed mix, if necessary, prior to or during seasonal rains to promote passive restoration of the area to pre -Project conditions (except that no invasive plant species will be restored). An area subjected to "temporary" disturbance means any area that is disturbed but will not be subjected to further
disturbance as part of the Project. If any grading occurred in areas intended to remain undeveloped, the site will be
recontoured to natural grade. This measure does not apply to situations in urban/developed areas that are temporarily impacted and will be returned to an urban/developed land use. Prior to seeding temporary ground disturbance areas, the Project biologist will review the seeding palette to ensure no seeding of invasive plant species, as identified in the most recent version of the California Invasive Plant Inventory for the region.

May 2024 Page 63
08/26/2024 City Council Agenda 395

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
B-9
Pre -construction Pond Check for Western Spadefoot. A pre- Project Applicant's
Prior to and During Rainy
City of Yucaipa Planning
construction pond check by a qualified biologist shall occur within Qualified Biologist
Season, Before Stary of
Division
the construction area prior to the rainy season before start of Construction
construction activities. If no potential habitat for western spadefoot is found during the survey, no further mitigation would be required.

If potential habitat for western spadefoot is identified, construction fencing appropriate for amphibian exclusion will be installed around the construction area. A pre -construction pond check and focused survey for western spadefoot will be conducted the winter prior to grading activities in the construction area. The pond check will occur within 24 hours of the winter season's first three rain events and prioritize ponded features that hold water for 45 days or greater.

Ideally, these rain events would produce a minimum of 0.2 inch during a 24-hour period.

If western spadefoot are detected during surveys in the fenced construction footprint, then biologists shall collect western spadefoot adults from areas within 300 feet of known occupied pools. Adults shall be relocated outside of the construction footprint to portions of the conserved open space (see Mitigation Measure B-10, Wildlife Movement) that have suitable breeding habitat and few or no western spadefoot individuals. Relocation of western spadefoot will follow the latest amphibian handling guidelines provided by the U.S.

Geological Survey.

B-11
Pre -construction Nesting Bird Survey. Construction activities Project Applicant's
During Construction
City of Yucaipa Planning
shall avoid the migratory bird nesting season (typically January 1 Qualified Biologist
Outside of Bird Nesting
Division
through September 30) to reduce any potential significant impact to Season
birds that may be nesting within the construction area. If construction activities must occur during the migratory bird nesting season, an avian nesting survey of the Project site and within 500 feet of all impact areas must be conducted to determine the presence/absence of fully protected species (including white-tailed kite), protected migratory birds, and active nests. The avian nesting survey shall be performed by a qualified wildlife biologist within 72 hours prior to the start of construction in accordance with the Migratory Bird Treaty Act and California Fish and Game Code Sections 3503, 3503.5, and 3513. If an active bird nest is found, the

Page 64 ends

08/26/2024 City Council Agenda 396

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
nest shall be flagged and mapped on the construction plans along with an appropriate buffer established around the nest, which will be determined by the biologist based on the species' sensitivity to disturbance (typically 300 feet for passerines and 500 feet for raptors and special -status species). The nest area shall be avoided until the nest is vacated and the juveniles have fledged. The nest area shall be demarcated in the field with flagging and stakes or construction fencing. On -site construction monitoring shall also be conducted when an active nest buffer is in place. No Project activities may encroach into established buffers without the consent of a monitoring biologist. The buffer shall remain in place until it is determined the nestlings have fledged and the nest is no longer considered active.

B-12
Pre -construction Burrowing Owl Surveys and Avoidance. One Project Applicant's
No More than 14 Days Prior
City of Yucaipa Planning
pre -construction burrowing owl survey shall be completed no more Qualified Biologist
to Site Preparation or
Division
than 14 days before initiation of site preparation or grading activities Grading Activities
and a second survey shall be completed within 24 hours of the start of site preparation or grading activities. If ground -disturbing activities are delayed or suspended for more than 30 days after the pre - construction surveys, the Project site shall be resurveyed. Surveys for burrowing owl shall be conducted in accordance with protocols established in the Staff Report on Burrowing Owl Mitigation, prepared by the California Department of Fish and Game (now California Department of Fish and Wildlife [CDFW]) in 2012 or current version.
• If burrowing owls are detected, a burrowing owl relocation plan shall be prepared and implemented in consultation with the City of Yucaipa. The relocation plan shall discuss the avoidance of disturbance to burrows during the nesting season for burrowing awls (February 1 through August 31), as well as the appropriate buffers to be established around occupied burrows as
determined by a qualified biologist. No Project activities shall be allowed to encroach into established buffers without the consent of a monitoring biologist. The buffer shall remain in place until it is determined that occupied burrows have been vacated or the nesting season has completed.

May W16/2024 City Council Agenda nP 65

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
• Outside of the nesting season, passive owl relocation techniques approved by CDFW shall be implemented. Owls shall be
excluded from burrows in the immediate project area, and within a buffer zone if there is a threat to the surface or subterranean burrow structure, by installing one-way doors in burrow entrances. These doors will be placed at least 48 hours prior to ground -disturbing activities. The Project area shall be monitored daily for one week to confirm owl departure from burrows prior to any ground -disturbing activities. Compensatory mitigation for permanent loss of owl habitat will be provided following the guidance in the CDFW 2012 Staff Report on Burrowing Owl Mitigation or current version.
• Where possible, burrows will be excavated using hand tools and refilled to prevent reoccupation. Sections of flexible plastic pipe shall be inserted into the tunnels during excavation to maintain an escape route for any wildlife inside the burrow.

B-13
Pre -construction Clearance Surveys. Pre -construction clearance Project Applicant's
Within 14 Days of Initiation
City of Yucaipa Planning
surveys for special -status wildlife shall be conducted by a qualified Qualified Biologist
of Ground Disturbance or
Division
Project biologist within 14 days of the initiation of ground Vegetation Clearing
disturbance or vegetation clearing within and adjacent to construction areas. Surveys shall be appropriate for detecting potentially occurring species, such as Dulzura pocket mouse, northwestern San Diego pocket mouse, Stephens' kangaroo rat, San Diego desert woodrat, Los Angeles pocket mouse, Southern California legless lizard, California glossy snake, coastal tiger whiptail, red diamondback rattlesnake, Blainville's horned lizard, and coast patch -nosed snake. Surveys need not be conducted in all areas simultaneously as long as they are conducted within 14 days of the initiation of ground disturbance or vegetation clearing in each area individually. If special -status species are detected, appropriate buffers shall be established, necessary and appropriate for the species, unless it is not feasible to avoid the species. If possible, non -listed special -status wildlife species may be captured and relocated to suitable habitat nearby where they are safe from

Page 66 ends

08/26/2024 City Council Agenda 398

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
construction activities. Surveys and relocation of these species may only be conducted by the qualified Project biologist.
• If non -listed special -status reptiles or small mammals are detected, they will be moved out of harm's way.
• The project biologist shall remain available at all times after initiation of ground disturbance or vegetation clearing in case special -status wildlife species enter the construction area. If nonlisted special -status species are detected in the construction area after initiation of ground disturbance or vegetation clearing, the qualified Project biologist shall take measures to move the species, or encourage it to move, to a safe place away from construction activities.

B-14
Pre -construction Bat Survey and Avoidance. The Project Project Applicant's
At a Minimum, 1 Month
City of Yucaipa Planning
contains potentially suitable roosting and/or foraging habitat to Qualified Biologist
Prior to State of
Division
support western mastiff bat. Potential impacts to bats by the Project Construction
may occur through direct removal of occupied roosts or indirectly through the removal of suitable foraging habitat. To determine if bats are currently roosting or foraging on the Project site, and to determine the level of impact that may occur by the Project, the following measures shall apply.
• Pre -construction Survey. A pre -construction clearance survey for bats will be conducted at a minimum of one month prior to the start of construction to determine if any bats are currently roosting within buildings on the Project site. The pre -construction survey will consist of a daytime roost assessment by a qualified bat biologist to determine if any bats or signs of active roosting are present. An emergence survey at dusk will be conducted after the roost assessment is completed to observe if any bats are emerging from suitable roost locations on the Project site.

Additionally, active and passive acoustic monitoring will be concurrent with the emergence survey to determine if any bats are echolocating within the Project site, identify the echolocating species, and determine the level of bat activity on site. Passive acoustic detectors will be deployed for a minimum of three nights. Once retrieved, bat echolocation calls will be analyzed off May 2024 Page 67
08/26/2024 City Council Agenda 399

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitorinq Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
site using Sonobat software and manual vetting to identify calls to the species level. If no bats are observed during the pre - construction survey, the Project may commence without
potential impacts to bats. However, if bats are observed roosting in the Project site, additional measures will be required as follows.
— Maternity Roosting Season Avoidance. All Project -related activities, including bat roost exclusion, shall occur outside the general bat maternity roosting season of March through August. Roost exclusion must only occur during the time when bats are most active (early spring or fall) to increase the potential to exclude all bats from buildings and minimize the potential for a significant impact to occur by avoiding the maternity roosting season.
— Replacement Roost Installation. One month prior to the exclusion of bats from the buildings, the applicant will procure and install one or two bat boxes from a reputable vendor, such as Bat Conservation and Management, to allow bats
sufficient time to acclimate to a new potential roost location.

The bat boxes shall be installed within close proximity to the buildings and in an area that is within close proximity to suitable foraging habitat. The bat boxes will be oriented to the south or southwest, and the area chosen for the bat boxes must receive sufficient sunlight (at least six hours) to allow the bat boxes to reach an optimum internal temperature
(approximately 90°F) to mimic the existing bat roost. The bat boxes will be suitable to house crevice -roosting bat species, including Mexican free -tailed bat, and large enough to contain a minimum of 50 bats (e.g., Four Chamber Premium Bat House). The bat boxes shall be installed on a 20-foot pole in an area that will be preserved by the Project.
— Roost Exclusion. Approximately one month after bat boxes have been installed, exclusion of the existing roost within the buildings will occur. The primary exit points for roosting bats will be identified, and all secondary ingress/egress locations

Page 608 ends

0 FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
on the buildings will be covered with a suitable material (e.g., tarp or wood planks) to prevent bats from leaving from other locations. The primary exit point will remain uncovered to allow exclusion devices to be installed. Exclusion devices will consist of plastic sheeting or a screen (with mesh one -sixth of an inch or smaller) installed at the top and allowing bats to leave but not return. The exclusion devices will be installed at night to increase the potential that bats have already left the roost and are less likely to return. Exclusion devices will be left in place for one week to ensure any remaining bats in the buildings are excluded. A passive acoustic monitoring
detector will also be deployed during the exclusion period to verify excluded species and monitor if bat activity has decreased during the exclusion period. Periodic monitoring during the exclusion period shall.also be conducted to
observe if any bats are still emerging from the buildings, and an active monitoring survey shall be conducted on the final night of exclusion to ensure no bats are emerging from the buildings and determine exclusion has been successful. Any continued presence of roosting bats will require an
adjustment to the exclusion devices and schedule.

B-15
Pre -construction American Badger Survey and Avoidance.

Project Applicant's
During the Colder Months,
City of Yucaipa Planning
Impacts to American badger individuals and wintering and natal Qualified Biologist
No Earlier Than 14 Days
Division
dens shall be avoided and minimized during construction activities Prior to Construction
through the following measures.

Activities
• Pre -construction Surveys (Wintering). During the colder months (generally between November 1 and February 15, when daily temperatures do not exceed 45°F), pre -construction surveys shall be conducted by the Project biologist in suitable habitat no earlier than 14 days prior to construction activities to determine whether American badger winter dens are present within the construction zone or within 100 feet of the construction zone boundary.
• Avoidance Measures (Wintering). If an American badger winter den is occupied within the construction zone or within 100 May 2024 Page 69
08/26/2024 City Council Agenda 401

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
feet of the construction zone, the den location shall be clearly marked with fencing or flagging in a manner that does not isolate the badger from intact adjacent habitat or prevent the badger from accessing the den, to avoid inadvertent impacts on the den.

If it is not practicable to avoid the wintering den during construction activities, an attempt will be made to trap or flush the individual and relocate it to suitable open space habitat.

Additionally, badgers can be relocated by slowly excavating the burrow, either by hand or mechanized equipment under the direct supervision of the Project biologist, removing no more than four inches at a time. After necessary trapping, flushing, or burrow excavation is completed, construction may proceed and the vacated winter den may be collapsed. If trapping is required, trapping will be limited to November 16 through the last day of February in accordance with Section 461, Title 14 of the California Code of Regulations (14 CCR 461). A written report documenting the badger removal shall be provided to the California Department of Fish and Wildlife within 30 days of relocation.
• Pre -construction Surveys (Natal Dens). During the late winter and summer (generally from March 15 through July 31), when American badgers may use natal dens for birthing and pup rearing, pre -construction surveys shall be conducted by the Project biologist no earlier than 14 days prior to ground - disturbing construction activities to determine whether American badger natal dens are present within the Project construction zone or within 200 feet of the construction zone.
• Avoidance Measures (Natal Dens). If natal dens are detected during construction, construction activities shall be halted within 200 feet of the natal den. This buffer may be reduced based on the location of the den or type of construction activity, and at the direction of the project biologist. Construction activities shall not preclude the ability of the documented badgers to disperse to on -site open space or off -site habitat when the natal den is vacated (i.e., habitat suitable for dispersal must be maintained until dispersal occurs). Construction will be postponed or halted

Page 70 ends

08/26/2024 City Council Agenda 402

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
in these areas until it is determined by the Project biologist that the young are no longer dependent on the natal den. To avoid inadvertent impacts during construction and to ensure that construction activities are at least 200 feet from active natal dens, any active natal dens within the survey area shall be clearly marked with fencing or flagging in a manner that will not inhibit normal behavioral activities (e.g., foraging and dispersing from the site) by the mother and pups.

B-16
Pre -construction Survey for Crotch Bumble Bee. A pre-
Project Applicant's
During Primary Flight
City of Yucaipa Planning
construction survey for Crotch bumble bee (Bombus crotchii) shall Qualified Biologist
Period for Workers and
Division
occur within the construction area during the primary flight period for Males (April 1 through
workers and males (April 1 through August 31) and prior to the start August 31) and Prior to
of construction activities. The survey shall ensure that no nests for Construction
Crotch bumble bee are within the construction area. Crotch bumble bee is a habitat generalist, ground -nesting bee. Surveys and other relevant recommendations will be in accordance with the most recent protocol available at the time of the surveys.

In the event an Incidental Take Permit is needed, mitigation for direct impacts to Crotch bumble bee will be fulfilled through compensatory mitigation at a minimum 1:1 nesting habitat replacement of equal or better functions and values to those impacted by the Project, or as otherwise determined through the Incidental Take Permit process. Mitigation will be accomplished either through off -site conservation or through a mitigation bank approved by the California Department of Fish and Wildlife. If mitigation is not purchased through a mitigation bank, and lands are conserved separately, a cost estimate will be prepared to estimate the initial start-up costs and ongoing annual costs of management activities for the management of the conservation easement area(s) in perpetuity. The funding source will be in the form of an endowment to help the qualified natural lands management entity that is ultimately selected to hold the conservation easement(s). The endowment amount will be established following the completion of a Project -specific Property Analysis Record to calculate the costs of in -perpetuity land management. The Property Analysis Record will take into account all management activities required in the May 2024 Rage 79
08/26/2024 City Council Agenda 403g

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Miqation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
Incidental Take Permit to fulfill the requirements of the conservation easement(s), which are currently in review and development.

B-22
Tree Removal Permit. Prior to the issuance of grading permits, it Project Applicant
Prior to Issuance of
City of Yucaipa Planning
will be the responsibility of the Project applicant to obtain the Grading Permit
Division
necessary permits for removal of trees, including oak trees, as well as the removal of plants within 200 feet of a streambank. The Project applicant will provide the appropriate plot plan or other documentation required by the City of Yucaipa.

CULTURAL RESOURCES
CR-2
Prior to the issuance of any permits allowing ground -disturbing Project Applicant's
Prior to Issuance of Any
City of Yucaipa Planning
activities, the project proponent/operator shall retain a Qualified Qualified Archaeologist
Permits Allowing Ground-
Division
Archaeologist, defined as an archaeologist meeting the Secretary of Disturbing Activities
the Interior's Standards for professional archaeology (U.S.

Department of the Interior, 2011), to carry out all mitigation measures related to archaeological resources. The contact information for this Qualified Archaeologist shall be provided to the City of Yucaipa's Planning Department prior to the commencement of any construction activities on -site. Further, the Qualified Archaeologist shall be responsible for ensuring employee training provisions are implemented during implementation of the Project:
• Prior to any ground disturbance, the Qualified Archaeologist, or their qualified designee, shall provide worker environmental awareness protection training to construction personnel for the protection of cultural (prehistoric and historic) resources. As part of this training, construction personnel shall be briefed on proper procedures to follow should unanticipated cultural resources be made during construction. New construction personnel shall also receive the worker environmental awareness protection training. • In the event that unanticipated cultural resources are encountered during any phase of project construction, all construction work within 50 feet of the find shall cease and the Qualified Archaeologist, in coordination with the City's Planning Department, shall assess the find for importance. Construction activities may continue in other areas. If the discovery is

Page 72 ends

08/26/2024 City Council Agenda 404

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitorinq Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
determined to not be significant by the Qualified Archaeologist, work will be permitted to continue in the area.
• If a find is determined to be important by the Qualified Archaeologist, they shall immediately notify the City's Planning Department. The City's Planning Department shall determine whether the resource is eligible for inclusion in the California Register of Historical Resources (CRHR). If the City determines the resource is eligible for inclusion on the CRHR, project redesign and preservation in place shall be the preferred means to avoid impacts to significant historical resources.
• Consistent with CEQA Guidelines Section 15126.4(b)(3)(C), if it is demonstrated that known resources (P36-000915, P36-
0012602, P36-0012604, and P36-0012605) and unanticipated finds cannot be avoided, the Lead Archaeologist, shall develop additional treatment measures in consultation with the City, which may include placement within conservation easements, preservation -in -place (e.g. capping sites with sterile, chemically neutral soil, geofabric, and some form of shallow -rooted landscaping), Phase II testing, Phase III data recovery or other appropriate measures. The City shall consult with appropriate Native American representatives in determining appropriate treatment for unearthed cultural resources if the resources are prehistoric or Native American in nature. Diagnostic
archaeological materials with research potential recovered during any investigation shall be curated at an accredited curation facility. The Lead Archaeologist shall prepare a report documenting evaluation and/or additional treatment of the resource. A copy of the report shall be provided to the City and to the South Central Coastal Information Center at California State University, Fullerton.
• If the cultural resource is identified as being potentially eligible for listing on either the NRHP or CRHR, and project designs cannot be altered to avoid impacting the site, a Phase III Data Recovery Program to mitigate project effects shall be initiated. A Data Recovery Treatment Plan detailing the objectives of the May 2024 Page 73
08/26/2024 City Council Agenda 405

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Mitigation Measure
Responsibility for
Implementation
Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
Date of Compliance)
Phase III Program shall be developed and contain specific testable hypotheses pertinent to the Research Design and relative to the site(s) under study. The Phase III Data Recovery Treatment Plan shall be submitted to the City's Planning Department, the appropriate Native American Band or Tribe, if applicable for review and comment prior to implementation of the Data Recovery Program. After Approval of the Treatment Plan, the Phase III Data Recovery Program for affected, eligible site(s) shall be completed. Typically, a Phase III Data Recovery Program involves the excavation of a statistically representative sample of the site(s) to preserve those resource values that qualify the site(s) as being eligible for listing on the NRHP/CRHR. The Phase III Data Recovery Report shall be
submitted to the City's Planning Department, the appropriate Native American Band or Tribe, if applicable, and the SHPO for review and comment prior to the issuance of a grading permit.

CR-3
Prior to the issuance of a grading permit and before any brush Project Applicant's
Prior to Issuance of a
City of Yucaipa Planning
clearance, grading, excavation and/or ground disturbing activities on Qualified Archaeologist
Grading Permit and Before
Division
the site take place, the project proponent shall retain a Secretary of Any Brush Clearance,
Interior Standards qualified archaeological monitor to monitor all Grading, Excavation, and/or
ground -disturbing activities in native soils in an effort to identify any Ground -Disturbing Activities
unknown archaeological resources.

The project archaeologist, in consultation with interested tribes, the developer and the City of Yucaipa, shall develop an Archaeological Monitoring Plan (AMP) to address the details, timing and responsibility of all archaeological and cultural activities that will occur on the project site. Details in the AMP shall include:
• Project -related ground disturbance (including, but not limited to, brush clearing, grading, trenching, etc.) and development scheduling;
• The development of a rotating or simultaneous schedule in coordination with the developer and the project archeologist for designated Native American Tribal Monitors from the consulting tribes during grading, excavation and ground disturbing activities

Page 74 ends

08/26/2024 City Council Agenda 406

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
on the site: including the scheduling, safety requirements, duties, scope of work, and Native American Tribal Monitors' authority to stop and redirect grading activities in coordination with all project archaeologists. Tribes shall coordinate as to Tribal Monitoring concurrent with development;
• The protocols and stipulations that the developer, City, Tribes and project archaeologist will follow in the event of inadvertent cultural resources discoveries, including any newly discovered cultural resource deposits that shall be subject to a cultural resources evaluation.
• Pursuant to the AMP, a tribal monitor from the consulting tribe (e.g., Morongo Band of Mission Indians, San Manuel Band of Mission Indians, and/or Soboba Band of Luiseno Indians) shall be present during the initial grading activities. If tribal resources are found during grubbing activities, the tribal monitoring shall be present during site grading activities.
• During construction activities, the project proponent shall ensure that Native American monitors have access to the project site to monitor grading and excavation activities. If cultural resources are discovered during ground -disturbing activities, the Native American monitor shall have authority to halt all grading activities within a predetermined radius of the find until its significance can be evaluated.

GEOLOGY AND
SOILS
GS-3
All excavation activities in any and all areas identified as likely to Project Applicant's
During Ground -Disturbing
City of Yucaipa Planning
contain paleontological resources will be monitored by a qualified Qualified Paleontologist
Activities
Division
paleontological monitor. Paleontological monitors must be equipped to salvage fossils as they are unearthed and to remove samples of sediments that are likely to contain the remains of small fossil invertebrates and vertebrates. Monitors shall be empowered to temporarily halt all construction activity to allow removal of abundant or large specimens.

May 2024 Pa e 75
08/26/2024 City Council Agenda 407

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
GS-4
All recovered paleontological specimens will be prepared to a point Project Applicant's
If Paleontological
City of Yucaipa Planning
of identification and permanent preservation, including washing of Qualified Paleontologist
Resources are Discovered
Division
sediments to recover small specimens shall be conducted.

Identification and full curation of all specimens into an established, accredited museum repository with permanent retrievable paleontological storage is required.

GREENHOUSE

GAS EMISSIONS
GHG-1
The City of Yucaipa shall require applicants of development projects Project Architect and
Prior to Issuance of
City of Yucaipa Planning
to install electric vehicle (EV) spaces in compliance with the Tier 2 Construction Contractor
Certificate of Occupancy
Division
standards under Section A5.106.5.3.2 of the Non -Residential Voluntary Measures or Section A4.106.8.2.1 of the Residential Voluntary Measures, whichever is applicable, in the 2022 California Green Building Standards Code (CALGreen). All site plans submitted to the City of Yucaipa Building and Safety Division shall illustrate compliance to either Section A5.106.5.3.2 or A4.106.8.2.1, whichever is applicable. In addition, the City of Yucaipa shall require applicants of development projects to include car/vanpool program with preferred parking and provide reserved preferential parking spaces for car -share, carpool, and ultra -low or zero emission vehicles.

Prior to issuance of the certificate of occupancy, the project applicant shall provide documentation to the City of Yucaipa Planning Division that verifies compliance with this measure.

GHG-2
The City of Yucaipa shall require applicants to design and construct Project Applicant and
Prior to Issuance of
City of Yucaipa Planning
all buildings to be all electric with electricity to be the only Construction Contractor
Building Permits (electric
Division
permanent source of energy for water -heating, mechanical and buildings) and prior to the
heating, ventilation, and air conditioning (HVAC) (i.e., space -heating Certificate of Occupancy
and space cooling), cooking, and clothes -drying. All major (Energy Star appliances)
appliances (e.g., dishwashers, refrigerators, clothes washers and dryers, and water heaters) provided/installed are electric powered Energy Star certified or of equivalent energy efficiency where applicable. Prior to issuance of building permits, applicants shall provide plans that show the aforementioned requirements to the City of Yucaipa Planning Division. Prior to issuance of the certificate of occupancy, the City of Yucaipa Building & Safety Division shall

Page 76 ends

08/26/2024 City Council Agenda 408

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Table 6 Mitigation Monitoring Requirements — Pacific Oaks Commerce Center Monitor
Responsibility for
Responsibility for
(Signature Required)
Mitigation Measure
Implementation
Timing
Monitoring
Date of Compliance)
verify installation of the electric -powered Energy Star or equivalent appliances.

See Mitigation Measures AQ-2 and AQ-4, under Air Quality.

HYDROLOGY AND WATER QUALITY
HWQ-1
Grading shall be phased so that prompt revegetation or construction will control erosion. Where possible, only those areas which will be built on, resurfaced, or landscaped shall be disturbed.

Construction Contractor
During Construction
Activities
City of Yucaipa Planning
Division
HWQ-2
Spill containment systems shall consist of a system of dikes, walls, Project Applicant and
Prior to Issuance of
City of Yucaipa Planning
barriers, berms and/or other devices designed to contain the Construction Contractor
Occupancy Permits
Division
spillage of the liquid contents of the containers stored in them and to minimize the buildup of stormwater from precipitation, and run-on from roof drainage and outside areas. If the spill containment system does not have a roof which covers the entire contained area, the spill containment system shall have the capacity to contain precipitation from at least a twenty-four (24), twenty-five (25) year rainfall event plus ten percent of the total volume of the material stored there or the volume of the largest container, whichever is greater. Spill containment systems shall also be constructed of impermeable and non -reactive materials to the liquids and/or wastes being contained.

HWQ-3
Spilled and/or leaked materials and/or wastes and any accumulated Project ApplicantlTenants
During Operation
City of Yucaipa Planning
precipitation shall be removed from the spill containment system in Division and Building
as timely a manner as is necessary to prevent the overflow of the Owner/Operator
spill containment system. Unless otherwise approved in writing by the City Engineer, all chemicals or wastes discharged within the spill containment system shall be disposed of in accordance with all applicable federal, state, and local rules, regulations, and laws, and shall not be discharged into the public sanitary sewer system, stormwater drainage system or onto the ground.

TRIBAL CULTURAL RESOURCES
See Mitigation Measures CR-2 and CR-3, under Cultural Resources.

May 2024 Page 77
08/26/2024 City Council Agenda 409�

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

2. Mitigation Monitoring Requirements
Tbis page intentionally left blank.

Page 78 ends

08/26/2024 City Council Agenda 410

3. Report Preparation

3.1 LIST OF PREPARERS
City of Yucaipa
Benjamin Matlock, Deputy Director of Community Development PlaceWorks
Nicole Vermilion, Principal
Jasmine Osman, Associate II
Ma 12024 Page 79
08/6/2024 City Council Agenda 411

FREEWAY CORRIDOR SPECIFIC PLAN MITIGATION MONITORING AND REPORTING PROGRAM

CITY OF YUCAIPA

3. Report Preparation
This page intenfionalyleft blank.
a e 80 PlaceIrlorks
0 8 2�/2024 City Council Agenda 412

ATTACHMENT 4
08/26/2024 City Council Agenda 413

ORDINANCE NO.448

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF YUCAIPA, CALIFORNIA, AMENDING ORDINANCE NO. 343, AMENDING THE

OFFICIAL LAND USE PLAN AND ZONING ORDINANCE OF THE CITY

OF YUCAIPA

THE CITY COUNCIL OF THE CITY OF YUCAIPA DOES HEREBY ORDAIN AS FOLLOWS:

Section 1. A public hearing has been held before the City Council of the City of Yucaipa (the "City"), duly noticed and conducted pursuant to the Planning and Zoning Laws of the State of California and applicable provisions of Division 3 of the Development Code as adopted by Ordinance No. 124; and the Official Land Use Plan of the City, as adopted by Ordinance No. 343, is hereby amended as provided in Section 2 herein below.

Section 2. The proposed land use designation contained on the "Official Land Use Districts Map" on file with the City, and bearing the file number Case No. 24-044/GPA/SPA, changes the Land Use District designation of the area encompassed by the boundaries of the Freeway Corridor Specific Plan, as reflected in Figure CDL-3, Land Use Modifications to the City's Planned Development (PD) district, omitting the Freeway Corridor Specific Plan unique districts from the map, and also changing the not -a -part, Yucaipa Valley Water District parcel to Institutional (In).

The Not -A -Part areas from the Freeway Corridor Specific Plan update shall also be omitted from Figure CDL-3.

Section 3. The City Clerk is hereby directed to cause the following summary of this ordinance to be published by two (2) insertions in the Yucaipa News Mirror, a newspaper of general circulation that is printed, published, and circulated in the City of Yucaipa, and hereby designated for that purpose by said Council of the City of Yucaipa: "Ordinance No. 448 changes the Land Use Designation reflected for the Freeway Corridor Specific Plan within the City's General Plan Figure CDL-2 to Planned Development (PD) and Institutional (IN) as part of Case No 24-044/GPA/SPA, and omits the not -a -part elements from Figure CDL-3." PASSED, APPROVED and ADOPTED this day of , 2024.

Justin Beaver, Mayor
ATTEST:

Ana V. Sauseda, MMC
Director of General Services/City Clerk
08/26/2024 City Council Agenda 414

ATTACHMENT 5
08/26/2024 City Council Agenda 415

dta
www.FinanceDTA.com

SUMMARY MEMORANDUM
October 13, 2023
To: Ashley Olson, EPD Solutions, Inc.

From: Kuda Wekwete, Jerry Wen, and Graeme Fraser, DTA
Subject: Economic Impact Study for the Proposed Pacific Oaks Commerce Center Project
The objective of this Economic Impact Study (the "Study") is to analyze the economic impacts of the proposed Pacific Oaks Commerce Center (the "Project") in the City of Yucaipa (the "City") in the County of San Bernardino (the "County").

Overall, the Project is anticipated to add 1,599 permanent new jobs within the City. The Project would also provide 1,686 temporary jobs associated with its construction.

Notably, the Project would deliver a substantial boost to the City's economy, with the production of goods and services increasing by $198.4 million annually. This growth in jobs and economic output would have a positive impact on the City as it would significantly expand its economic base, thereby providing a strong foundation for the City's continued economic growth and fiscal health.

A Description of the Project
The Project sits on 113 acres located on the east side of Live Oak Canyon Road and south of Interstate 10 in Yucaipa and comprises planning areas BP and BP 3 of the proposed Pacific Oaks Commerce Center Tract Map (the "POCC Tract Map"), as depicted in Figure 1 below.

Figure 1: Aerial Map for the POCC Tract Map
I i �
08/26/2024 City Council Agenda 416
Newport Beach I San Jose I San Francisco I Riverside I Dallas I Houston I Raleigh I Tampa

As illustrated in Figure 2 below, the Project will result in the development of up to 2,054,000 total square feet consisting of two (2) Class A, industrial buildings. Building 1 is 1,052,500 total square feet of warehouse inclusive of 20,000 square feet of office space.

Building 2 is 1,001,500 square feet of warehouse inclusive of 20,000 square feet of office space.

Figure 2: Proposed Project Site Plan
The buildings will be used as high cube distribution and warehousing facilities and are designed to attract top -tier tenants looking to serve the Southern California marketplace.

Green building concepts and sustainable design principles will be employed to provide buildings that operate efficiently and reduce demand on resources.

The overall land area of the POCC Tract Map exceeds 313 acres, with 200 acres to remain undeveloped and predominantly zoned as open space with limited zoning of 60 acres for residential use. The buildings are set back behind a ridgeline separating the 1-10 and the project to protect the City's view corridor. The building elevations are designed to blend with the surrounding environment and rely on wood, metal and natural materials to evoke a modern farmhouse aesthetic.

The project will be phased over a three-year period and includes infrastructure improvements to southern Yucaipa that include constructing a new project roadway connecting Live Oak Canyon Road to the eastern edge of the property, the southern extension of Wildwood Canyon Road, along with drainage improvements and extending utility services to the south side of the 1-10 Freeway to provide infrastructure to support the Pacific Oaks Commerce Center aswell as future growth within the Freeway Corridor Specific Plan.

B Overview of Economic Impact Analysis
This Study identifies the general economic impacts of the Project on the City. Economic impact studies operate under the basic assumption that any increase in spending resulting from a development project has direct, indirect, and induced effects as illustrated in Figure 3 below. First, there is a direct effect caused by the additional output of goods or services EPD Solutions, Inc. October 13, 2023
Economic Impact Si`udy for the Proposed Pacific Oaks Commerce Center 08/26/2024 City Council Agenda 417 2

on -site. Second, there is a ripple of indirect effects on all the industries whose outputs are used by firms located within the Project and various firms' supply chains. Third, there are induced effects that arise when employment increases in the region and stimulates greater household spending.

Figure 3: Direct, Indirect, and Induced Impacts
In evaluating these economic impacts, the Study incorporates two stages of the development process: construction and operations. First, there isa one-timeimpact from the construction of the various types of land uses within the Project. Then, after the construction and tenant improvement phases are complete, the Study determines the magnitude of the permanent annua/recurring impacton the economy through the ongoing operations of the development that has occurred on the Project site.

DTA used the web application of the Impact Analysis for Planning ("IMPLAN") economic modeling system. IMPLAN is a nationally recognized input-output model that can be used to estimate the short -run impacts of changes in the economy through the use of a multiplier analysis. The IMPLAN terms used herein have the following meanings:
■ "Employment" follows the same definition as U.S. Bureau of Economic Analysis' regional economic accounts and U.S. Bureau of Labor Statistics' Census of Employment and Wages data, which represents the full-time/part-time annual average. Thus, one (1) job lasting 12 months is equivalent to two (2) jobs lasting 6 months each or three (3) jobs lasting 4 months each. In terms of a typical IMPLAN analysis, a job that lasts 6 months would be considered 1/2 (0.50)of ajob,while one that lasts3 monthswould be considered 1/4 (0.25) of a job. Notably, IMPLAN's analysis normally includes both FTE jobs and part- time jobs, which overstates the number of FTEjobsgenerated by a development project.

EPD Solutions, Inc. October 13, 2023
Economic Impact Si`udy for the Proposed Pacific Oaks Commerce Center 08/26/2024 City Council Agenda 418 3

In order to compensate for that factor, DTA applies a discounting factor provided by IMPLAN that varies by industry and can be used to reduce the number of direct jobs generated by IMPLAN in our Study so that it represents the equivalent of the number of FTE d i rect jobs.
■ "Total Economic Output" represents the total value of all goods and/or services produced throughout a designated economy during a specified period of time, including Labor Income, Other Value Added, and the cost of Intermediate Inputs. Each of these components are defined below.
"Labor Income" includes employee compensation (wages and benefits) and payments received by self-employed individuals and unincorporated business owners. The Quarterly Census of Employment and Wages ("CEW") published by the Bureau of Labor Statistics is the primary source of employment and income data for IMPLAN.
"Other Value Added" encompasses other property income, such as the consumption of capital investment, profits, royalties, dividends, interest impacts, and taxes on production and imports. The primary sources of Other Value Added are taxes on production and imports net of subsidy and Gross Operating Surplus ("GOS") data at the 3-digit NAICS level released by the Bureau of Economic Analysis.
"Intermediate Inputs" include the purchases of non -durable goods and services that are used for the production of other goods and services within a project, rather than for final consumption. Intermediate Inputs equal the Total Economic Output minus the sum of Labor Income and Other Value Added.

C Recurring Economic Impacts of the Project
As shown in Table 1 below, the annual economic impacts of the Project on the City will be quite substantial. First, the Project is anticipated to create 1,299 permanent jobs on -site. In addition, the Project is expected to generate 300 permanent recurring indirect and induced jobs off -site within the City, for a total of 1,599 jobs. As the City's total current workforce consists of 10,793 employees, FTEemployees holding these additional jobs will constitute up to a 14.82%increase in the size of the City's current workforce. The total Labor Income associated with these new jobs will equal $78.9 million generated directly on -site, plus $16 million off -site Citywide, for a total increase in Labor Income of $94.8 million annually within the City. Finally, adding in $16.5 million in Other Value -Added revenues and $87 million in Intermediate Expenditures yields a total economic Output of $198.4 million per year from the Project, which represents a considerable boost to the City's economy.

Table 1: Recurring Impact Conclusions (City)
Employment
1,299
300
1,599
Overall Output
$152,427,809
$45,943,238
$198,371,048
Labor Income
$78,896,527
$15,950,723
$94,847,249
Other Value Added
$7,125,103
$9,400,996
$16,526,100
Intermediate Expenditures
$66,406,179
$20,591,519
$86,997,699
Note: All numbers are subject to rounding.

EPD Solutions, Inc.

Economic Impact Si`udy for the Proposed Pacific Oaks Commerce Center 08/26/2024 City Council Agenda
October 13, 2023
/19 4

D One -Time Economic Impacts of the Project
Similarly, as reflected in Table 2 below, the one-time economic impacts from the construction of the Project on the City will be quite substantial. First, the Project is anticipated to employ 1,410 construction jobs on -site'. In addition, the Project is expected to generate 276 indirect and induced jobs off -site, for a total of 1,686 temporary jobs within the City. The total Labor Income associated with these new jobs will equal $111 million directly on -site, plus $15.8 million off -site but within the City, for a total increase in Labor Income of $126.7 million Citywide on a one-time basis. Finally, adding in $20.8 million in Other Value -Added revenues and $123 million in Intermediate Expenditures yields a total one-time economic Output of $270.5 million for the Project, which will inject a substantial amount of growth into the City's construction industry. Notably, the one-time construction output represents the aggregate outputs generated during the three-year Project construction period.

Table 2: One-Time/Construction Impact Conclusions (City) Employment
1,410
276
1,686
Overall Output
$222,532,829
$47,985,523
$270,518,352
Labor Income
$110,980,026
$15,760,603
$126,740,630
Other Value Added
$8,497,328
$12,254,470
$20,751,798
Intermediate Expenditures
$103,055,475
$19,970,450
$123,025,924
Note: All numbers are subject to rounding.
'Under IMPLAN's definition, each "one-time job" represents one year of full-time employment for one employee EPD Solutions, Inc. October 13, 2023
Economic Impact Si`udy for the Proposed Pacific Oaks Commerce Center 08/26/2024 City Council Agenda 420 5

The annual and one-time economic impacts of the Project on the City are summarized graphically in Figures and 5 below.
1,800
1,600
1,400
1,200
1,000
800
600
400
200
0 $300
$250
$200
c
$150
$100
$50
$0
Figure 4: Jobs Generated by the Project (City)
276
Permanent One-time (Construction)
■ Direct Indirect/Induced
Figure 5: Total Economic Output (City)
E Jobs -Housing Balance
$48.0
Recurring One-time (Construction)
■ Direct Indirect/Induced
The jobs -housing balance is an indicator of the relative equilibrium between employment and housing opportunities in a given area. A positive balance between jobs and housing has a beneficial impact on a municipality by decreasing costs associated with commuting and traffic congestion. It also reduces commute times, improves local, social, cultural and family involvement, provides a more attractive work/life balance to residents, and generates savings EPD Solutions, Inc. October 13, 2023
Economic Impact Si`udy for the Proposed Pacific Oaks Commerce Center 08/26/2024 City Council Agenda 4216

to local public agencies in terms of the need to construct and maintain new road improvements and other facilities.

As reflected below in Table 3 and illustrated in Figure 6, the City's current ratio of jobs within the City as compared with the number of housing units Citywide is 0.531, as compared with a Statewide average of 1.260. The addition of 1,599 new jobsthrough the construction of the Project would increase this ratio to 0.610.

Table 3: Pre -Project and Post -Project Jobs -Housing Balance CitywideDescription Average
Pre-Project Post -Project
Statewide
Average
Number of Jobs
10,793
12,392
18,537,400
Number of Housing Units
20,310
20,310
14,707,698
Existing2
20,310
20,310
14,707,698
New
N/A
0 N/A
Jobs -Housing Balance
E00.531

0.610

1.260
Figure 6: Pre -Project and Post -Project Jobs -Housing Balance:

1.500

1.000
t6l

0.500 53

0.000
Pre -Project Post -Project Statewide
Citywide Citywide
For the conclusions of the Study, please see Attachments 1 and 2. If you have any further questions regarding this Executive Summary, please feel free to contact usat (800) 969-4DTA.

Enclosures:

1. Attachment 1 —Annual Recurring Economic Impacts

2. Attachment 2 —One-Time Economic Impacts
2 Labor Market Information Division, State of California Employment Development Department EPD Solutions, Inc. October 13, 2023
Economic Impact Si`udy for the Proposed Pacific Oaks Commerce Center 08/26/2024 City Council Agenda 422 7

ATTACHMENT 1
EPD Solutions, Inc.

Pacific Oaks Commerce Center
Economic Impact Study

ANNUAL RECURRING

ECONOMIC IMPACTS
08/26/2024 City Council Agenda 423

dta
WWW. PIN A NC E D7A.0 OM
Attachment 1-A
Pacific Oaks Commerce Center
City of Yucaipa
Recurring Economic Impact (2023$)
W. ..
. • .1
Building 1
County
927.15
$58,320
$54,071,714
$12,646,131
$52,511,610
$119,229,454
Direct
634.00
$60,732
$38,504,152
$3,470,482
$32,416,196
$74,390,830
Indirect
170.08
$53,624
$9,120,323
$3,629,781
$12,649,794
$25,399,899
Induced
123.07
$52,387
$6,447,238
$5,545,867
$7,445,620
$19,438,725
City
780.58
$59,300
$46,287,933
$8,058,307
$42,463,903
$96,810,142
Direct
634.00
$60,732
$38,504,152
$3,470,482
$32,416,196
$74,390,830
Indirect'

85.04 $53,624
$4,560,162
$1,814,890
$6,324,897
$12,699,949
Induced'

61.54 $52,387
$3,223,619
$2,772,934
$3,722,810
$9,719,363
Building 2
County
972.52
$58,329
$56,726,258
$13,280,965
$55,077,608
$125,084,832
Direct
665.00
$60,740
$40,392,374
$3,654,621
$33,989,984
$78,036,979
Indirect
178.42
$53,642
$9,570,888
$3,808,851
$13,277,360
$26,657,099
Induced
129.10
$52,386
$6,762,996
$5,817,494
$7,810,264
$20,390,754
City
818.76
$59,308
$48,559,316
$8,467,793
$44,533,796
$101,560,906
Direct
665.00
$60,740
$40,392,374
$3,654,621
$33,989,984
$78,036,979
Indirect'

89.21 $53,642
$4,785,444
$1,904,425
$6,638,680
$13,328,549
Induced'

64.55 $52,386
$3,381,498
$2,908,747
$3,905,132
$10,195,377
Grand Total - County
1,899.67
$58,325
$110,797,972
$25,927,096
$107,589,218
$244,314,286
Grand Total - City
1,599.34
$59,304
$94,847,249
$16,526,100
$86,997,699
$198,371,048
' Assumes 50% of County's indirect/induced impacts will be created within the City. 08/26/2024 City Council Agenda 424

Page 1 of 2 ends

ATTACHMENT 2
EPD Solutions, Inc.

Pacific Oaks Commerce Center
Economic Impact Study

ONE-TIME ECONOMIC

IMPACTS
08/26/2024 City Council Agenda 425

dta
WWW. F] IJ ANC E DrA_C OM
Attachment 1-B
Pacific Oaks Commerce Center
City of Yucaipa
One-time Economic Impact (2023$)
Impact Employment Per Labor Income —I=ML Employee Aggregate •ther Value Intermediate Total Out
..Expenditures
Vertical Construction
County
1,348.17
$72,197 $97,333,388
$20,909,667
$87,686,283 $205,929,338
Direct
999.00
$77,508
$77,430,986
$5,297,850
$62,318,340
$145,047,176
Indirect
107.26
$67,830
$7,275,247
$4,769,065
$10,771,038
$22,815,350
Induced
241.91
$52,197
$12,627,156
$10,842,751
$14,596,905
$38,066,812
City
1,173.59
$74,457
$87,382,187
$13,103,758
$75,002,312
$175,488,257
Direct
999.00
$77,508
$77,430,986
$5,297,850
$62,318,340
$145,047,176
Indirect'

53.63 $67,830
$3,637,624
$2,384,533
$5,385,519
$11,407,675
Induced'
120.96
$52,197
$6,313,578
$5,421,376
$7,298,453
$19,033,406
Horizontal Construction
County
612.87
$73,699
$45,167,845
$12,096,601
$55,310,091
$112,574,537
Direct
411.00
$81,628
$33,549,041
$3,199,478
$40,737,134
$77,485,653
Indirect

90.54 $64,123
$5,805,648
$3,904,651
$7,853,594
$17,563,894
Induced
111.33
$52,214
$5,813,156
$4,992,472
$6,719,363
$17,524,990
City
511.94
$76,882
$39,358,443
$7,648,039
$48,023,613
$95,030,095
Direct
411.00
$81,628
$33,549,041
$3,199,478
$40,737,134
$77,485,653
Indirect'

45.27 $64,123
$2,902,824
$1,952,326
$3,926,797
$8,781,947
Induced'1

55.67 $52,214
$2,906,578
$2,496,236
$3,359,681
$8,762,495
Grand Total - County
1,961.04
$72,666
$142,501,233
$33,006,268
$142,996,374
$318,503,875
Grand Total - City
1,685.52
$75,194
$126,740,630
$20,751,798
$123,025,924
$270,518,352
'Assumes 50% of County's indirect/induced impacts will be created within the City. 08/26/2024 City Council Agenda 426

Page 2 of 2 ends

ATTACHMENT 6
08/26/2024 City Council Agenda 427

r � �
Draft January 2024
m YUCAIPA

FREEWAY CORRIDOR

SPECIFIC PLAN
08/26/2024 City Council Agenda 428

ACKNOWLEDGMENTS
Prepared for: Prepared by:

CITY OF YUCAIPA PLACEWORKS
3 MacArthur Place, Suite 1100
Development Services Department
Santa Ana, CA
Benjamin Matlock, Deputy Director / City Planner 714.966.9220 34272 Yucaipa Boulevard, Yucaipa CA 92399
909.797.2489 x261 Contact:
[email protected] Karen Gulley, Managing Principal
[email protected]
CITY COUNCIL Suzanne Schwab
[email protected]
Justin Beaver, Mayor
Chris Venable, Mayor Pro Tem In Association with:

Bobby Duncan TRANSLUTIONS
Jon Thorp 16732 Irvine Boulevard, Suite 200
Matt Garner Tustin, CA 92780
949.656.3131
Contact:

Sandipan Bhattacharjee, Principal
[email protected]
//M6/2024 City
City 1*29aipa

TABLE OF CONTENTS
Chapter 1: Introduction

1.1 Project Overview ...................................... 1-3

1.2 Project Vision ......................................... 1-4

1.3 Regional and Local Setting .............................. 1-4

1.4 Ownership / Districts ................................... 1-4

1.5 Planning Objectives ................................... 1-10

1.6 Relationship to General Plan ........................... 1-10

1.7 Environmental Quality Act Compliance ................. 1-11

1.8 Authority and Scope .................................. 1-11 Chapter 2: Baseline Conditions

2.1 Introduction..........................................2-2

2.2 Existing Uses ......................................... 2-4

2.3 Surrounding Land Uses................................2-6

2.4 Topography and Natural Features ....................... 2-6

2.5 Earthquake Faults.....................................2-8

2.6 Landslides and Liquefaction ........................... 2-10

2.7 Hydrology and Drainage .............................. 2-10

2.8 Biological Resources..................................2-12

2.9 Cultural Resources...................................2-12

2.10 Hazardous Materials/Hazardous Wastes ................ 2-15

2.11 Traffic and Circulation ............................... 2-15

2.12 Market Study.......................................2-20 Chapter 3: Project Description

3.1 Introduction..........................................3-3

3.2 Development Goals and Objectives ...................... 3-3

3.3 Public Benefits........................................3-4

3.4 Land Use Plan and Site Plan Concept .................... 3-5

3.5 Circulation Plan.......................................3-9

3.6 Grading Concepts....................................3-15

3.7 Drainage System ..................................... 3-17

3.8 Water and Sewer System ............................... 3-19

3.9 Fire Protection.......................................3-22

3.10 Parks..............................................3-23 Chapter 4: Development Standards

4.1 Introduction..........................................4-2

4.2 General Provisions .................................... 4-2

4.3 Permitted Land Uses ................................... 4-2

4.4 Development Standards ................................ 4-5

4.5 Landscape Standards..................................4-7

4.6 Sign Regulations......................................4-7

4.7 Open Space Standards.................................4-8

4.8 Grading Requirements ................................. 4-9
Chapter 5: Design Guidelines

5.1 Introduction..........................................5-2

5.2 Nonresidential........................................5-2

5.3 Residential...........................................5-5 Chapter 6: Implementation

6.1 Introduction..........................................6-2

6.2 Phasing..............................................6-2 FreeVW§WM�M9N1c.11AfiV* 2024 430

6.3 Financing Mechanisms...................................6-5

6.4 Maintenance Responsibilities..............................6-6

6.5 Methods and Procedures for Implementation ................ 6-7

6.6 Enforcement of The Specific Plan ........................... 6-7

6.7 Interpretations...........................................6-9

6.8 Density/Intensity Transfers ............................... 6-10

6.9 Statement of Severability................................. 6-10

6.10 CEQA Compliance ..................................... 6-11 Appendix A: Definitions
//M6/2024 City
City j*3 jaipa

LIST OF FIGURES
Figure 1-1. Regional Location Map................................1-5 Figure 1-2. Local Vicinity Map ................................... 1-6 Figure 1-3. Site Ownership Map...................................1-7 Figure 1-4. APN Parcel Map ..................................... 1-8 Figure 1-5. Specific Plan Districts ................................ 1-9 Figure 2-1. Aerial Map .......................................... 2-5 Figure 2-2. Topographic Map .................................... 2-7 Figure 2-3. Slope Intensity Map .................................. 2-9 Figure 2-4.Floodplain Map......................................2-11 Figure 2-5. Market Area ........................................ 2-22 Figure 2-6. Estimated Household Growth ........................ 2-23 Figure 2-7. Local and Regional Retail Trade Area Boundaries ....... 2-27 Figure 3-1. Land Use Plan ....................................... 3-8 Figure 3-2. Conceptual Circulation Plan ......................... 3-10 Figure 3-3. Street Sections: Collector Streets ...................... 3-12 Figure 3-4. Street Sections: Local Streets and Trails ................ 3-13 Figure 3-5. Grading Plan........................................3-14 Figure 3-6. Pedestrian Circulation / Trails Plan ................... 3-16 Figure 6-1. Conceptual Phasing Plan .............................. 6-4

LIST OF TABLES
Table 2-1 Property Ownership ...................................... 2-6 Table 2-2 Tribal Consultation 1.................................... 2-12 Table 2-3 Tribal Consultation 2.................................... 2-13 Table 2-4 Tribal Consultation 3.....................................2-14 Table 2-5 Acreage by Planned Land Use Designation .................. 2-22 Table 2-6 Household Growth Forecast .............................. 2-23 Table 2-7 Recommended Housing Capacity .......................... 2-25 Table 2-8 General Shopping Center Types ........................... 2-25 Table 2-9 Retail Market Potential .................................. 2-29 Table 2-10 Retail Market Potential ................................. 2-30 Table 2-11 Potential Market Demand for Non-residential Uses ......... 2-32 Table 3-1 Overall Land Use Distribution Summary .................... 3-7 Table 3-2 City of Yucaipa Street Standards ........................... 3-11 Table 3-3 Fire Station Locations .................................... 3-23 Table 4-1 Permitted Uses ........................................... 4-2 Table 4-2 Permitted Uses ........................................... 4-3 Table 4-3 Residential Development Standards ......................... 4-5 Table 4-4 Nonresidential Development Standards ..................... 4-6 Table 6-1 Phase Plan Allocation ..................................... 6-3 Table 6-2 Maintenance Plan: Responsible Parties ...................... 6-7 Table 6-3 Review Authority ........................................ 6-10 r
2024
r

R�
4p
.
t ti
M. V�i' Ift
-,4;� " -
.�

INTRODUCTION
08/26/2024 City Council Agenda 434

I/Ar6/2024 City
Cite 435aipa

Chapter 1: Introduction

1.1 PROJECT OVERVIEW
Situated along both sides of Interstate 10, the Freeway Corridor Specific Plan (FCSP) area has the potential to serve several vital functions for the City of Yucaipa and the greater region. When completed, the 1,242-acre plan will provide a wide range of housing types to meet Yucaipa's future residential needs as well as locations for new business opportunities that will bring local jobs and economic growth for the community.

The Freeway Corridor Specific Plan was first adopted in November 2008 but remained dormant through the years of the Great Recession and the subsequent economic recovery. This 2022 Specific Plan Amendment was prepared in response to a number of changing conditions. A comprehensive update of the City's General Plan was completed in 2016, and the FCSP document needs to be consistent with the City's current goals and policies as well as implement the General Plan vision for the community. In 2012, the SCAG Regional Transportation Plan / Sustainable Communities Strategy was adopted (amended in 2020), which is also a factor contributing to the necessity of the FCSP update. The COVID-19 pandemic of 2020 again brought changes in land use expectations and goals —the demand for brick -and -mortar shopping centers further declined, and the overall demand for logistics/distribution centers increased to meet consumer needs.

Another recent development in Yucaipa is the establishment of a burgeoning wine industry. This began with the submittal of an application to the US Alcohol and Tobacco Tax and Trade Bureau to request the establishment of the Yucaipa Valley American Viticulture Area (AVA). Along with the development of the Yucaipa Valley Wine Country, opportunities are available in the plan area to support this emerging industry, and part of the vision for the FCSP includes the encouragement of agriculture in open space areas that would have the appropriate growing conditions for vineyards. Additionally, the Pumpkin Patch is a popular community attraction in the project area, and the FCSP maintains this use to support the agricultural operations.

The overarching vision for the FCSP is the creation of a place that reflects the unique character of Yucaipa and ultimately supports the community's needs into the future. Additionally, the FCSP is meant to allow a degree of flexibility that can provide a standard of quality without stifling opportunities or imposing inflexible regulations that would preclude creative development responses. An emphasis on sustainability is also a key part of the plan, with an encouragement of multimodal forms of transportation, ride sharing, and connections to future public transportation routes through appropriate land use densities.

The FCSP offers a mixture of residential, commercial, and business park development. In addition to these land uses, it provides community amenities such as trails and permanent open space areas that will preserve major ridgelines and drainage corridors. A variety of residential uses are provided to help meet the growing demand for housing in the city. The commercial and business park uses provide employment as well as retail and entertainment opportunities for those living in the community. The commercial uses take advantage of the freeway visibility and access to serve both local and regional needs. The residential areas are linked to the commercial and business park areas through an extensive system of multimodal trails.

FreeW126 �iil"SPi� � . January 2024 - DRAFT 436

1.2 PROJECT VISION
This document is intended to provide the overall direction for development to achieve the General Plan's vision for the project area.

The Specific Plan includes these key components:
• Allowable land uses within the 1,242-acre area.
• Development regulations, design standards and design
guidelines to ensure quality development.
• A multimodal trail and circulation system that provides access for vehicles, pedestrians, and bicycles.
• A plan for protecting and managing important natural
resources, including the hillsides and native oak trees. • Required infrastructure facilities, including financing and phasing, to support implementation of the plan.
• Implementation and administrative processes needed to approve specific development projects in the FCSP area.

The 2022 Specific Plan Amendment incorporates revisions to the 2008 plan to meet the changing needs of the market and additional changes that resulted from the adoption of the 2016 General Plan. In addition, the revisions provide more effective infrastructure connections to support future development and add flexibility to remain competitive with changing market conditions.

1.3 REGIONAL & LOCAL SETTING
The 1,242-acre Freeway Corridor Specific Plan area is in the City of Yucaipa in San Bernardino County. The FCSP area is bisected by Interstate 10 (I-10) and abuts the Riverside County boundary to the south. Regional access to the project is provided by I-10 from the east and west. Local access is provided by Live Oak Canyon Road, County Line Road, Oak Glen Road, Wildwood Canyon Road, and Calimesa Boulevard (see Figure 1-1, Regional Location Map, and Figure 1-2, Local Vicinity Map).

The FCSP is currently accessible from two freeway interchanges. The I-10/Live Oak Canyon/Oak Glen Road interchange is at the western edge of the project area, and the 1-10 / County Line Road interchange is at the southeastern edge of the project area. A third interchange is planned from Wildwood Canyon Road and will provide additional connectivity for the later phases of the project.

1.4 OWNERSHIP / DISTRICTS
Ownership of the site includes several entities; however, the Palmer and Robinson families have owned the majority of the project area since the 1950s. (Refer to Figure 1-3, Site Ownership Map, and Figure 1-4, APN Parcel Map, for a listing of the parcels.) Additionally, the project has been divided into districts to better understand the intensity of development in particular areas of the site. These districts are depicted in Figure 1-5, Specific Plan Districts.

I/M6/2024 City
City 437-aipa

Chapter 1: Introduction
Figure 1-1. Regional Location Map
14 LS
�r
Ritter Ranch I
Apple Valley
1sa Victorville 0
18 895
Acton
Santa Clafita Magic Mountain °
Hesperia 19
° Wilderness Area
Pleasant View
Ridge
Wilderness Area ❑2 i Wightwood
Angeles
National ForestSan
San Gabriel I ® 1]3
Q a Fernando Wilderness Area Bernardino
Big Bear City
❑ ! Crestline o aka Arrowhead COUnty1B Big Bear Lake
La Canada 1 ° o
Fllntridge
Burbank ` Los Angeles i
/ County % 3J0 ae
universal City O endale Pasadena Arcadia Glendora
0 0 r 63 Rancho San Bernardino
Cucamonga Fontana Rialto °
j o -
la State � Baldwin Park 0 0
Los Angeles °
uk Beverly Hills oEl Monte O West Covina -"
Ontario
Pom6na o o edlanc
-
O ° 1 Grand Terrace
Santa: Monica �- - -_ / OChino
O `
so A j o ire Loma Riverside
Inglewood L,
0 Downey
Norwalk \ Hills Slat --J °Moreno Valley
11\ ° Park
Card OFullerton \� ''d Cof na
\ 9 °
Torrance " O Anaheim
orange ,s\ Perris
Rancho Palos Long Beach ,.

O SantalAna 241
o erdes III o j
9 Sun city
Orange County
Huntington Irvine N
Beach Costa Mesa '/' o eke Elsinore
Rancho Santa `>
® Newport BeachMargarita
`Wldomar
\ Lake Forest O
o_�� '
\ 4
`\ Laguna Niguel MAurniieta
Los ° ° \
An2Jeles \ I. San Diego
County\ \ © N-Gowffty -, V
24]
Bighorn
Mountain
Wilderness
Y.

C
oYuc
San Gorgonio
..r Wlderness 1611
r-
-------------—--—--—--
--
T E Deaen Hot
Reservation 62 Springs
]9 111
263 Mount San O elm Springs`
Jacinto State
Park Cathedral
Soboba O
Riversideeser—tion
C04MW Idyllvnld Agua Caliente
_l ]4
]9
4 Santa Rosa
Reservation
Cahuilla
ecula Reservation
N
Miles
14 0 2.5 5 10 15 20
r
• January 2024 -DRAFT
43 Figure 1-2. Local Vicinity Map
copal I
n qty of Highland ,
' Port Ave I
I m
;____ rr a
I t. I a
ockton Ave u % Nice Ave
a / a
/ 9
Warner B Crafton 'o n
E Citrul Ave Citrus Ave
I �
iighland Ave I »
I `^
I �
I ,
� I I
Rd
------rafton Hills o heights Rd
College eQFo
G� ..

I i
— I —— — —— =�nnessee St Yucaipa Blvd Yucaipa Blvd
Fsunser Dr N
Redlands Oc
Country Club Palo Alto Dr Pita V/sta
E 5u�set Dr S City of
Redlands
Herngt'Aki'
Preserve
�1a
Dunlap Acres e"
» o
» V�
Oa
Kentucky St
rl
I I
I I
I I
Ivy Ave ;
--I I
I I
I I
1 I Carter St I ---------------I
II ,t El Dorado
o Ranch Park —�
—
Yucaipa
Regional Park-------------
Oaka
-- -- — Glen Rd-
m Oak pen CreeK,'
1 Oak Glen
q pee
I
Date Ave 1
I
Vucaipa Valley I
Golf Club I
Cedar Ave City of ;
w n
Yucaipa a Yucaipa I-- i------,
3 I
» a n — Wildwood I OL
Avenue1. Can State _
T Avenue E » o Park I --_—_,
» I
\ ,., r��=Colorado St
1 I I
r� Wildwood Canyon Rd 1 I
r� Or
,ate„� Avenue
SITE Avenue
` e O Wil yo I �0
` O m
o in a oDt dwoodCa �d I
of
Ot
t �1oe Buttert\�
oc Y
� Co W Avenue L
I l —
____I Myrtlewood Or Selt00%c�o pt I
I Garden Air Golf City of II
Course
Calimesa 1------
I I edit Ave 1
D Co
I P Re I
I �e a^d3Bci___—___J
LEGEND
11mumu- Site Boundary
//��24 City Counci
Cherry Valley
N
Miles
0 0.250.5 1 1.5 2
City 1*39aipa

Chapter 1: Introduction
Figure 1-3. Site Ownership Map
LEGEND

OWNERSHIP MAP
0 Robinson Ownership
0 Palmer Ownership
0 Other Owneship
FreeQ wemiil"SPi� q . January 2024 -DRAFT 440

Figure 1-4. APN Parcel Map
LEGEND

BASE MAP FEATURES
Site Boundary
I/M6/2024 City
City 1*41aipa

Chapter 1: Introduction
Figure 1-5. Specific Plan Districts
LEGEND

BASE MAP FEATURES
Specific Plan Area
City Boundary
County Boundary
Property Lines

DISTRICT
Specific Plan District 1
0 Specific Plan District 2
Specific Plan District 3
Specific Plan District 4
N
US Feet
/4 0 500 1,000 2,000
r
• January 2024 -DRAFT

1.5 PLANNING OBJECTIVES
During the preparation of the 2008 Specific Plan, a set of planning goals and objectives were established. The overall intent of these goals has been carried into the 2022 Specific Plan Amendment, but with minor modifications to better fit market demands. The objectives are:
• Create an integrated addition to the City of Yucaipa containing housing, employment opportunities, retail/commercial areas, recreation areas, and other facilities essential to the daily lives of the residents.
• Ensure that the plan complies with the intent of the City Development Code related to hillside development to preserve key ridgeline features that frame Yucaipa, with allowances to ensure the feasibility of constructing uses that benefit the region. • Expand the range of housing opportunities in the region to meet the needs of a variety of household types, sizes, and income levels.
• Provide an abundance and variety of open space and
multimodal trails for bicycles, and pedestrians throughout the community.
• Design a safe and efficient circulation system that adequately supports the anticipated level of vehicular, pedestrian, and bicycle traffic in and around the project.
• Develop a financing and phasing plan that provides for the efficient and timely provision of infrastructure and services as development occurs.
• Comprehensively plan the FCSP area with consideration of other contiguous areas to ensure compatible and complementary development, circulation patterns, infrastructure, and services.

1.6 RELATIONSHIP TO GENERAL
PLAN
The General Plan for the City of Yucaipa identifies major goals that are intended to preserve the community's "rural atmosphere" and are relevant to the Specific Plan area. The City uses various growth management measures to achieve these goals and to mitigate any adverse impacts associated with the projected growth in population.

These measures include but are not limited to:
• Limit density in most new developments to reflect a relatively low level of land use intensity.
//"6/2024 City
City j*4u3 aipa

Chapter 1: Introduction
• Identify and preserve natural resources.
• Utilize development impact fees to defray infrastructure costs. • Regulate hillside and ridgeline development, preserve natural and undisturbed open space, protect oak trees, and conserve riparian habitat areas to maintain a rural atmosphere and benefit the citizens of Yucaipa.

These efforts are intended to facilitate the retention of "the scenic qualities that enhance the community's unique identity."

1.7 CALIFORNIA

ENVIRONMENTAL QUALITY ACT
(CEQA)
A Program Environmental Impact Report (EIR) in accordance with the provisions of the California Environmental Quality Act (CEQA) was prepared for the 2008 Freeway Corridor Specific Plan. A Subsequent EIR has been prepared for the 2022 Amendment.

1.8 AUTHORITY AND SCOPE
This specific plan is enacted pursuant to Section 65450 et seq. of the California Government Code. A specific plan is a regulatory tool that local governments use to guide development in a local area consistent with the general plan. While the general glan is the primary guide for growth and development in a community, a specific plan is able to focus on the unique characteristics of a special area by customizing the planning process and land use regulations to that area. In accordance with state law, a specific plan shall include text and diagrams that specify:
• The distribution, location, and extent of the uses of land, including open space, within the area covered by the plan. • The proposed distribution, location, and extent and intensity of major components of public and private transportation, sewage, water, drainage, and other essential facilities proposed in the area covered by the plan and needed to support the land uses described in the plan.
• Standards and criteria by which development will proceed, and standards for the conservation, development, and utilization of natural resources, where applicable.
• A program of implementation measures, including regulations, programs, public works projects, and financing measures necessary for implementation.

In the Specific Plan area, no building or structure shall be erected, constructed, or structurally altered, nor shall any building, structure, or land be used, except as authorized by the Specific Plan and by relevant provisions of the Yucaipa Municipal Code (YMC). The Specific Plan is intended to replace City zoning regulations except where noted. Where the Specific Plan is silent, the YMC shall apply. r
• January 2024 -DRAFT

R�
4p
.
t ti
M. V ,: I--, - - - -,4;� " -
Ift. '!

2AL.____;ems•` + '

BASELINE

CONDITIONS
08/26/2024 City Council Agenda 446

2.1 INTRODUCTION
This chapter provides a summary of the baseline conditions of the Freeway Corridor Specific Plan project site. The conditions have remained largely unchanged since 2008 when the Specific Plan was first adopted; however, all maps have been updated as necessary to reflect current conditions. Throughout this chapter, these conditions are referred to as the "baseline conditions." The purpose of defining baseline conditions is to provide a deeper understanding of the issues, constraints, and opportunities guiding the creation of the plan. The issues addressed in this chapter are:
• Historical Context
• Existing Uses
• Surrounding Land Uses
• Topography and Natural
Features
• Earthquake Faults
• Landslides
• Hydrology and Drainage
• Biological Resources
• Cultural Resources
Additional information on these topics can be found in the SEIR.

2.1.1 HISTORICAL CONTEXT
Agriculture in the Yucaipa Valley began during the 1810s and 1820s with grazing for a satellite rancho property of San Gabriel Mission's Rancho San Bernardino. In the 1830s, the Mexican government secularized California's missions, and the title for Rancho Yucaipa and other Rancho San Bernardino lands came into the possession of Antonio Maria Lugo and his sons in 1842. That same year, Lugo's son- in-law, Diego Sepulveda, built an adobe dwelling on Rancho Yucaipa, i
City Council Agenda
City 1*47-aipa

Chapter 2: Baseline Conditions
which stands today northwest of the plan area. He grazed sheep and cattle on the property with the help of Cahuilla Tribe members from nearby areas.

Mormon settlers founded the town of San Bernardino in the late 1840s and ostensibly purchased Rancho San Bernardino in 1851, but returned to Utah in 1857, leaving ownership of the title for the land in the federal courts until 1865, when it was officially granted to the Lugos. In the meantime, however, non -Mormon settler John Brown Sr. had occupied the Yucaipa portion of Rancho San Bernardino, and his friend, trapper James Waters, took over the rancho in 1857 and was the de facto owner when the court case was settled in 1865.

On January 28,1869, Waters sold the Yucaipa Valley portion of the San Bernardino Rancho to John W. Dunlap and William Standefer, two cattlemen from Texas who brought 4,000 head of cattle with them.

Within a few years, the remaining Serrano Indians had been evicted, Standefer had sold his share to Dunlap, and Dunlap had died, leaving the care of the ranch to his wife and his son Franklin Pierce Dunlap, who took up residence in the Yucaipa adobe. During the 1870s, more than 500 acres of the Dunlap Ranch were cultivated in grain and 100 acres in alfalfa, with the rest in hay and pastureland. Franklin Pierce Dunlap built a brick mansion for his family surrounded by grain fields northeast of the original ranch headquarters and established a dairy operation in Live Oak Canyon. This became the "Dairy Ranch" subdivision of the Dunlap Ranch, which roughly corresponds to the project area.

The Southern Pacific Railroad was built in the late 1870s and passed within a few miles of the Dunlap Ranch, allowing the ranch to profitably ship grain to Arizona. In the 1880s, fruit culture became dominant in the San Bernardino / Riverside region and helped spur the great land boom of that decade, though the Dunlap Ranch holdings were not offered for subdivision at that time. A drought from 1896 to 1904 caused the Dunlap Ranch to lose heavily in cattle, and a water company established by the Dunlap family in 1899 suffered from competition with more established holdings in Oak Glen to the northeast.

The bulk of the FCSP area remained largely unsubdivided through the early decades of the twentieth century as a succession of farmers leasing land from the Redlands and Yucaipa Land Company continued to produce dairy, grain (particularly barley), and hay.

Freewwlemiil"SNi� l� . January 2024 -DRAFT 448