Agenda Item No. 14
CITY OF YUCAIPA
AGENDA REPORT
TO: Honorable Mayor and City Council
FROM: Fermin Preciado, Director of Development Services/City Engineer Todd Gutjahr, Public Works AnalystIV7---
FOR: City Council Meeting of September 23, 224
SUBJECT: Award of Contract - Installation of City Furnished High Bay LED Light Fixtures and Lighting Equipment at the 7t' St. Courts (12385 7t' St.) — Project No. 11213 RECOMMENDATION:
That the City Council:
1) Award and authorize the City Manager to execute a contract, and the City Manager or his designee to administer the terms of the contract to the lowest responsible bidder, LogicLamp Technologies of Fullerton, CA in the amount $46,031.35 for the Installation of City Furnished High Bay LED Light Fixtures and Lighting Equipment at the 7th St.
Courts (12385 7th St.) — Project No. 11213 (Project); and 2) Approve the amount of $4,600 for construction contract contingency and the amount of $2,300 for construction contract administration, staff time, permitting and inspection costs for a total construction budget in the amount of $52,931.35; and 3) Authorize the City Manager or his designee to administer the distribution of the contract contingency; and
4) Approve the plans and specifications prepared for the Project.
BACKGROUND/DISCUSSION:
On September 12, 2022, the City Council approved the revised Conceptual Pickleball Master Plan for the 7th Street Pickleball facility and approved the development of Phase 1 of the facility, which includes the following:
1. Removal of the existing 7th Street Modular Skate Park equipment and construction of four new pickleball exclusive courts.
2. Installation of a steel structure over the four proposed pickleball courts that emulates/expands the existing steel structure cover.
3. Demolition of the existing theatre building located east of the existing basketball courts.
4. Installation of lighting under the new steel structure cover over the four pickleball courts.
Items 1-3 of the Pickleball Master Plan have been completed.
Item No. 4 includes replacing the current high bay lights under the original basketball court cover with LED fixtures, as well as installing the same LED light fixtures for the new pickleball courts. In addition, a lighting control system will be installed to allow staff to remotely control and monitor the entire LED lighting system.
Staff publicly advertised the Project for construction bids and on September 5, five (5) bids were received from contractors as follows:
Contractor
Bid Amount
LogicLamp Technologies, LLC
$46,031.35
MM Energy and Lighting
$148,800.00
CWFC Inc.
$72,800.00
Quality Light and Electrical
$90,246.00
FEC Electric (1)
$53,805.00
(1) FEC Electric submitted a request to withdraw their bid due to a clerical error and their request was granted.
LogicLamp Technologies, LLC (LogicLamp) of Fullerton, CA, is the apparent lowest responsible bidder. The Engineer's Estimate for the installation is $55,000. Staff has reviewed the bid documents and determined that the documents meet the requirements of the contract specifications. LogicLamp has performed similar work for other agencies, and their work has been deemed satisfactory.
FISCAL IMPACT:
The estimated cost of this Project is in the amount of $52,932 and is included in the adopted FY25 Capital Improvement Program as the 7t' Street Pickleball Facility. No other fiscal impact is anticipated as a result of the recommendations.
Attachments:
1. Bid Summary
2. Construction Agreement — LogicLamp
Approved by: �%
ATTACHMENT 1
City of
Project/Bid No:
Staff Present:
Bids Opened by:
Project Name
BID OPENING MEETING
11213
Date: 09/05/24 Time: 2:00 PM
Debbie Shortidige, Kevin Garcia, Todd Gutjahr
Debbie Shortlidge
Installation of City Furnished High Bay LED Light Fixtures& Equip at 7th Street Courts Number of Addendums 0
BIDDER
ADDRESS
ADDENDUM(S)
ADDITIVE
ALTERNATIVES
BONDS
NON -COLLUSION
BID AMOUNT
1 LogicLamp Technologies. LLC
231 E Imperial Highway Ste#104
Fullterton, CA 92833
4( G�
2 MM Energyand Lighting
2601 Hughes Ln
Bakersfield, CA 93304
�<
f
✓
/� ¢ ��
r Ur �00
3 CVVFC Inc
35482 Alexandria Way
Beaumont, CA 92223
✓�
/
v✓✓
-7 2 r p-A �p
0 V
4 Qualityv
Light and Electrical
11055 Alder Ave Bloomington, CA
92316
X
/
/
4�
5 � C. t IeO'��'
`�
6 7
8 9
10 L
Recorder: YC a
All Bids were received by the Bid Due Date and Time listed above.
Date: 2
Engineers Estimate
Vaughan, CC/Bids/ @Bid Opening Sheet
ATTACHMENT 2
AGREEMENT
THIS AGREEMENT is made and entered into this 2311 day of September 2024, by and between the City of Yucaipa, a municipal corporation, hereinafter referred to as "City", and LogicLamp Technologies, LLC located at 231 E. Imperial Highway, #104 Contractor / Company Name Street Address
Fullerton
City
CA 92833 (844) 422-2820 hereinafter referred to as "Contractor".
State Zip Code Phone
PROJECT: Installation of City Furnished High Bay Light Fixtures and Lighting Equipment at the 71h St Courts (12385 7ch St) —Pro* ect No. 11213
WITNESSETH, in this consideration of their covenants, the parties hereto agree as follows:
The contract documents for the Project shall consist of the Notice Inviting Sealed Bids, Instructions to Bidders, Proposal, General Specifications, Standard Specifications, Special Provisions, Plans, and all referenced specifications and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices, and affidavits; and also including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner (collectively, the "Contract Documents"). The Contract Documents are made a part hereof as though fully set forth herein.
In consideration of such work, City agrees to pay Contractor and Contractor agrees to accept the sum of Forty -Six Thousand, Thirty -One Dollars and Thirty -Five cents ($46,031.35) in the manner provided in the Contract Documents and subject to adjustment provided therein.
Concurrently with the execution of this Agreement, Contractor shall file with the City the bonds and certificates of insurance specified in the Contract Documents and subject to adjustment provided therein.
This Contract shall not be assigned without the written permission of the City Council.
IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written.
ATTEST:
Ana Sauseda, MMC
Director of General Services/City
Clerk
FUNDS AVAILABLE/INSURANCE
APPROVED:
Phillip White, Director of Finance
Fermin G. Preciado, Director of
Development Services/City Engineer
APPROVED AS TO FORM:
Steven Graham, City Attorney
CITY OF YUCAIPA
A Municipal Corporation
Chris Mann, City Manager Date
CONTRACTOR: