CITY OF
DATE:
'1'O:

FROM:

PREPARED BY:

Item No. 11

AGENDA REPORT
June 8, 2026
Honorable Mayor and City Council
Dr. Sean M. Moore, City Manager
Fermin Preciado, Director ofDevelbpment Services/City Engineerle F,* Landon Kern, Assistant City Engineer V
SUBJECT: Wildwood Canyon Road
(Project) —Amendment t
Engineering Inc.

RECOMMENDATION:

That the City Council:
and Interstate 10 Freeway Interchange Project
Professional Services Agreement with HDR

1. Approve the reallocation of the approved project budget of $3,365,217 as follows:
a. Professional services agreement - $3,297,864
b. Estimated project management and agreement administration - $67,353; and

2. Approve and authorize the City Manager to execute a contract amendment to the professional services agreement with HDR Engineering, Inc., in the amount of $29,024 for additional required services associated with the preparation of the Project Approval and Environmental Document (PA/ED) phase, bringing the total contact amount to $3,297,864; and

3. Authorize the City Manager or his designee to administer the terms of the professional services agreement; or
4, Provide further direction to staff.

BACKGROUND/DISCUSSION:

The following represents a brief summary of the development of the Wildwood Canyon Road and Interstate 10 Freeway Interchange Project (Project):

The Freeway Corridor Specific Plan (FCSP) was adopted in 2008, and included the Project as a key transportation infrastructure element. The County of San Bernardino's "Yucaipa Valley General Plan" also identified the need for this interchange as early as 1965. • In 2016, the Project was adopted into SBCTA's "SBCTA Valley freeway Interchange 06/08/2026 City Council Agenda 283

Phasing Program."
+ The initial phase of the Project development was the Project Study Report (PSR) completed in 2021, The City's project team was led by HDR Engineering, Inc., and was completed through coordination with City staff, SBCTA and Caltrans.

As a result of the PSR phase, three 3 interchange alternatives were recommended to be studied further. Since the Project will be a new connection to the 1-10 Freeway, Federal Highway Administration (FHWA) approval was required in this Phase, resulting in FHWA's "Finding of Acceptability" which is a required step in the approval process for new interchanges.

Completion of the PSR phase allowed the Project to move into the next required Caltrans Phase the Project Approval and Environmental Document (PA/ED). The PANED phase began in the summer of2020, through the approval of new professional services agreement with HDR and an updated funding agreement with SBCTA.

Several approved funding agreements with SBCTA have identified their total funding contribution toward the Project in the amount of $1.5 million for the PSR and PANED phases.

Since the Project was adopted into SBCTA's 'Valley Freeway Interchange Program with a maximum total cost in the amount of $10 million, SBCTA's total contribution is currently limited to a maximum of $5 million.

Other funding sources for the PSR and PANED phases have included Development Impact Fees (DIF), Measure I funds, and SB 1 funds, Additionally, the City has secured $4 million in Community Project Funding Congressional Directed (CPFCD) funding through support from Congressman Obernolte's office, and anticipates additional CPFCD funding through the City's most recent funding application currently under review.

The Project will provide additional freeway access to Yucaipa residents and to the Freeway Corridor Specific Plan area as well as providing operational benefits to the mainline freeway by improving travel times and decreasing congestion. The PANED phase has further analyzed the recommendations provided in the PSR, and identified the following interchange design alternatives for further consideration:
,Alternative 2 , Diamond Interchange Overcrossing with a perpendicular bridge crossing Alternative 3 — Diamond Interchange Overcrossing with a skewed bridge crossing Alternative 4 -- Diverging Diamond Interchange (DDI) Overcrossing Schematic drawings of the alternatives are attached for reference, The scope of work provided by HDR to complete the PA/ED phase has included the preparation of numerous engineering analysis and studies, traffic modeling studies, drainage analyses, and environmental review studies. The information from this analysis has been incorporated into a Draft Project Report (DPR) and Draft Environmental Document (DED), which are currently being reviewed by Caltrans. Once the Caltrans review process is complete, the DPR and DED are then required to be circulated to the public as a part of a 45 day public review process. This provides an opportunity for public comments to be submitted for consideration in the final versions of the DPR and DED. 06/08/2026 City Council Agenda 284

In January of 2026, Caltrans updated requirements related to the construction air quality analysis efforts, requiring a new methodology be used to supplement studies already completed for Project.

In order to complete this additional work, HDR provided a cost proposal in the amount of $29,024 for the City's consideration. City staff is recommending approval of the proposed contract amendment No. 2, in order to allow HDR to complete the required analysis, and move forward toward completion of the PALED phase. Due to an estimated decrease in the costs for project management and contract administration, the proposed recommendations to not result in a change to the total approved project cost.

FISCAL IMPACT;
The recommendations only reallocate pre-existing project budget, and do not require any increase to the total project budget.

Attachments:

1. HDR professional services agreement amendment no. 1

2. Interchange Build Alternatives 2, 3 and 4
06/08/2026 City Council Agenda 285

ATTACHMENT I
06/08/2026 City Council Agenda 286

( ITY 01
AMENDMENT NO.2 TO "INTERSTATE 10 AT WILDWOOD CANYON ROAD

INTERCHANGE PROJECT APPROVAL AND ENVIRONMENTAL DOCUMNENTS (PANED) PHASE"
THIS AMENDMENT, made and entered into this Sty day of June 2026, by and between HDR Engineering, Inc, hereinafter called "CONSULTANT," and the City of Yucaipa, a municipal corporation, hereinafter called "City,"
NOW, THEREFORE, CONSULTANT and CITY mutually agree as follows:

Subject to the terms and conditions of the original agreement dated May 27, 2020, between the subject CONSULTANT and the City of Yucaipa, shall be as follows for the additional professional services.

Original Agreement Amount $ 3,040,217
Amendment No. 1 $228,622.51
Prol2gsed Ameadment N . 2
Revised Agreement Amount $ 3,297,864
CITY Fee and Payment Thereof
The CITY will pay the CONSULTANT for services rendered in the total amount NOT TO EXCEED $3,297,864 for the work required to complete professional services for the Interstate 10 at Wildwood Canyon Road Interchange Project PANED Phase.

IN WITNESS WHEREOF, the parties hereto have executed this agreement on the $kh day of June, 2026.

ATTEST:

Ana Sauseda, MMC Date
Director of General Services/City Clerk
APPROVED AS TO FORM:

Steven Graham Pacifico, City Attorney

CITY OF YUCAIPA,
a municipal corporation
Dr. Sean M. Moore
City Manager

CONTRACTOR
Datc
HDR Engineering, Inc. Date
06/08/2026 City Council Agenda
287

EXHIBIT A ADDED SCOPE OF WORK AS REQUIRED BY CALTRANS

PROJECT REPORT & ENVIRONMENTAL DOCUMENT
(PA&ED) FOR THE 11-10 WILDWOOD CANYON ROAD

INTERCHANGE

IN THE CITY OF YUCAIPA
Task 1— Proposed Agreement Amendment No. 2
Construction, AQ Calculator & Model Change for DED Completion requested by CT D8 The CONSULTANT will prepare a new construction GHG emissions analysis for the three Build Alternatives using the original inputs from Appendix C of the approved Air Quality Technical Report and the latest CAL-CET2021 v1.0.4 model. Because the previous analysis assumed a 2025 start date, this date will be postponed to January 2027. Other assumptions regarding project parameters, construction duration, equipment use, and vehicle trips will be held consistent with the Air Quality Technical Report unless informed otherwise. Results will be summarized in a memo.

DELIVERABLES:
• Memorandum summarizing the results of the new construction GHG emissions analysis for the three Build Alternatives using the original inputs from Appendix C of the approved Air Quality Technical Report and the latest CAL-CET2021 v1.0.4 model.

Title
Hours
Hourly Rates
Proposed Fee
Environmental Lead
4 $283.33
$1,133
Environmental Generalist
20 $207,97
$4,158
Air Quality Specialist
72 $266.69
$19 202
Quality Control Reviewer-
model/memo
12 $230.83
$2,770
Engineering Lead Input
4 $440.31
$1,761

TOTAL PROPOSED
AMENDMENT NO. 2
$29,024
06/08/2026 City Council Agenda 288

ATTACHMENT 2
06/08/2026 City Council Agenda 289

06/08/2026 City Council Agenda 290

116
/ _ _ _ _ _ _
�W gf11 i�R Mi�wM
C i.L11N �.CIN�Y�YM Hf 1Y0•�� H F1 Ri MIS
06/08/2026 City Council Agenda 291

t• � �� 5 f . . � � r 4 .
1 I
it] III III Pr
-�,'�s-- „ice _ �--��- _�r�_•.^--�.y_ .�. .i iK - __ __-��- a ..ai��ni.-s—._. __ - • � 4 _ __ NMI
dries
.re,.are r. erw�iar ai i.:ii e..�
06/08/2026 City Council Agenda 292

← All documents from this meeting