INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 17 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Conflict with or obstruct implementation of the
applicable air quality plan?
b) Violate any air quality standard or contribute
substantially to an existing or projected air quality
violation?
c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state
ambient air quality standard (including releasing
emissions which exceed quantitative thresholds for
ozone precursors)?
d) Expose sensitive receptors to substantial pollutant
concentrations?
e) Create objectionable odors affecting a substantial
number of people?
Discussion
a: No impacts.
b-c: The San Luis Obispo County Air Pollution Control District (APCD) has developed the CEQA Air Quality Handbook to evaluate project specific impacts and determine if air quality mitigation measures are needed, or if potentially significant impacts could result. The City refers to this Handbook for all projects subject to CEQA. Although the construction phase of the project is below the thresholds for significance, some mitigation is recommended. Construction for this project includes grading to expand the wetland area and to create the sedimentation basin. The “operation” phase of this project would include periodic maintenance of the sedimentation basin and is considered insignificant. It is anticipated that sedimentation removal might occur every five (5) to ten (10) years, and would largely depend on the severity of storm conditions.

According to the general operational screening criteria in the APCD Handbook, the grading associated with the proposed project is not expected to generate potentially significant air quality impacts.

However, emissions associated with project construction could affect adjacent properties and would add to the cumulatively significant effect that results in basin-wide exceedance of air quality standards.

These temporary fugitive dust and combustion emissions can impact local air quality. Implementation of the following mitigation measures will reduce air quality impacts to a less than significant level:

MM 3.1: The following conditions shall be included on all project plans and adhered to for all grading-related permits:

Reduce the amount of disturbed area where possible.

Use water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increase watering frequency when wind speeds exceed 15 MPH.

Reclaimed (non-potable) water shall be used whenever possible.

All dirt stockpile areas should be sprayed daily or as needed using reclaimed (nonpotable) water when feasible.

Page 351 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 18 of 43 ends

Exposed ground areas that are planned to be reworked more than one (1) month after initial grading should be sown with a fast-germinating native grass seed and watered until vegetation is established.

All areas to be paved (i.e. access road to the sediment basin) should be completed as soon as possible.

All trucks hauling dirt, sand, soil or other loose materials are to be covered or shall maintain at least two (2) feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with CVC Section 23114.

Streets shall be swept at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed (non-potable) water should be used where feasible.

Diesel idling shall not be permitted.

Signs that specify the no idling requirement shall be posted and enforced at the construction site.

Use of alternative-fueled equipment is recommended whenever possible.

The contractor shall designate a person or persons to monitor and implement these measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity and to prevent the transport of dust off-site. The name and telephone number of such persons shall be provided to the Air Pollution Control District (APCD) prior to the start of any grading-related activities. (See MM 9.1 for erosion control measures).

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 3.2: All portable equipment (50 horsepower or greater) used during grading operations must be issued a permit by either the California Air Resources Board (CARB) or the APCD. (Contact the APCD Engineering Division at (805) 781-5912 for specific information regarding permitting requirements prior to start of the project).

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction d-e: No impacts.

4. Biological Resources
Environmental Setting
The project area includes the confluence of Corbett Creek and Carpenter Canyon Creek as well as the confluence of Corbett Creek and Arroyo Grande Creek. Corbett Creek is a perennial creek that carries flow except in drought years. The property has a long history of livestock grazing, and there has been some modification of natural hydrology by re-alignment of the creeks and construction of a berm.

To determine the extent and quality of wetland habitat on the project site, and whether portions of the project area were eligible for wetland protection and restoration through the Wetland Reserve Program

Page 352 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 19 of 43 ends

(WRP), a report was conducted by the Natural Resources Conservation Service (NRCS) in December 2006. According to the report, the Clark Property does not contain any land that would be eligible for the Wetland Reserve Program. The site contains small areas of natural wetlands in four (4) delineations and the remaining land subject to the conservation easement is considered non-wetland.

The project site contains a variety of non-native and native plant species, with willows being the dominant native tree species. The prevailing understory species present include German ivy, poison hemlock, California blackberry, hoary nettle, poison oak, and morning glories (Denise Duffy and Associates, 2003). According to the Tally Ho Creek Planning Project Technical Memo Appendices prepared by Waterways Consulting, Inc. (June 2010), there are several identified special status plant and wildlife species that are likely present, although were not observed during the site inventory. These include Hoover’s bent grass (Agrostis hooveri), black-flowered figwort (Scrophularia atrata), San Bernardino aster (Symphyotricham defoliatum), California red-legged frog (Rana aurora draytonii), Southwestern pond turtle (Actinemys marmorata pallid), and the Yellow Warbler (Dendroica petechia).

The U.S. Fish and Wildlife Service (USFWS) and California Department of Fish and Wildlife (CDFW) have regulatory responsibility for the protection of special status plant and wildlife species. “Special status” species are selected for protection because they are rare and/or subject to population and habitat declines. Special status is a general term for species that are afforded varying levels of regulatory protection.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Have a substantial adverse effect, either directly or through habitat modification, on any species identified as a sensitive, candidate, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or the
U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any riparian
habitat or other sensitive natural community identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or the
U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on federally
protected wetlands, as defined by §404 of the Clean
Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling,
hydrological interruption, or other means?
d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species or with established native resident or migratory wildlife
corridors, or impede the use of native wildlife nursery sites?
e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?

Page 353 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 20 of 43 ends

f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state habitat conservation plan?
Discussion
a-d: With the mitigation measures identified below, it is not anticipated that the project will have a significant impact on biological resources due to the historic equestrian use of the site and the short duration of construction/grading activities. The site is dominated by non-native plants except for willows. The purpose of creating the sedimentation basin and enhancing the floodplain area is to first impede flooding downstream, and second to enhance the native habitat. It is expected that the long term benefits of restoring the floodplain and riparian habitat will outweigh short term impacts.

Although the project will incorporate requirements for any necessary permits from the California Department of Fish and Wildlife (CDFW) and United States Fish and Wildlife Service (USFWS), several mitigation measures are included to offset any potential short term impacts. The following measures are primarily designed to promote habitat avoidance.

MM 4.1: Construction/grading shall take place after the breeding season for the Yellow Warbler (April – July) to limit noise impacts. If construction/grading must start during this time period, surveys of nesting birds within the project vicinity shall be completed by a qualified wildlife biologist. If the surveys identify active nests of the Yellow Warbler within the project vicinity, all earthmoving activities shall cease until the chicks have fledged. The biologist shall provide the lead agency and responsible agencies with a written report of survey findings, and shall specify when the project work may safely commence.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager (in consultation with the U.S. Fish and Wildlife Service (USFWS) prior to proceeding with work) Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 4.2: A qualified wildlife biologist shall complete and submit to the lead agency and responsible agencies a pre-construction survey for California red-legged frogs and Southwestern pond turtles. The survey shall be conducted during the time period when these species are known to be active. If no individuals are found, construction may proceed. If individuals are found during the initial investigation, the biologist shall conduct clearance surveys for these species approximately one (1) week prior to construction. Individuals found within the construction area will either be relocated to similar, adjacent habitats at least fifty (50) yards outside of the project area, or held in captivity until construction is complete. The project area shall be monitored during construction and appropriate measures taken to ensure that the individuals of relocated species do not move into the construction area. The decision of whether to relocate the animals shall be made by the biologist, although all mitigation activities would have to occur within the framework of any permits issued by the USFWS and CDFG.

Page 354 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 21 of 43 ends

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager (in consultation with the U.S. Fish and Wildlife Service (USFWS) prior to proceeding with work) Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 4.3: A qualified botanist shall conduct an initial site survey to map occurrence of Hoover’s bent grass, San Bernardino aster and black-flowered figwort. If sensitive plant species are found on site and determined to be potentially impacted, the botanist shall prepare procedures that ensure no net loss of plants. These include, but are not limited to, designating avoidance areas, transplanting the plant populations to an equivalent location on site, or replaced in-kind with new plants at a ratio of two (2) plants replaced for each one (1) lost or at a ratio acceptable to the botanist. The transplanted or replaced plants shall be monitored over a five (5) year period.

Any plants lost during this time period shall be replaced. The botanist shall prepare a planting, irrigation and maintenance plan that includes these provisions. If the botanist concludes that avoidance is a viable option, locations determined to be potentially impacted will be flagged against inadvertent or unintentional damage.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager (in consultation with the U.S. Fish and Wildlife Service (USFWS) prior to proceeding with work) Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 4.4: The applicant shall acquire appropriate resource agency permits and undertake protection measures as required by those agencies.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
e-f: No impacts.

5. Cultural Resources
Environmental Setting
Creeks are a focal area of concern for the purposes of cultural resource sensitivity due to the pre-history and historical activity that occurred along and extending from creeks. The Central Coastal Information Center under contract to the State Office of Historic Preservation (OHP) helps implement the California Historical Resources Information System (CHRIS). It integrates information on new resources and known resources into CHRIS, supplies information on resources and surveys to governments and supplies lists of consultants qualified to conduct historic preservation fieldwork within the area. The California Archaeological Site Inventory is the collection of Site Records, which has been acquired and managed by the Information Centers and the OHP since 1975. According to these records, no known cultural site is located in the immediate project vicinity. Of the nineteen (19) site investigations conducted within a half mile radius of the project site, four (4) of which were on adjoining properties, there was only one (1)

Page 355 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 22 of 43 ends

site that revealed any positive results for archaeological resources, which was located about 0.4 mile south of the project site near Paulding Middle School.

By virtue of the project area including the confluence of two (2) creeks, there may be a likelihood of prehistoric or early historic occupation or use of the site even though there are no known sites in the vicinity. Additionally, the proposed project requires a limited amount of surface excavation for the purposes of collection of fine sediment and floodplain restoration.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Cause a substantial adverse change in the
significance of a historical resource, as defined in
§15064.5?
b) Cause a substantial adverse change in the
significance of an archaeological resource, pursuant to §15064.5?
c) Disturb any human remains, including those interred
outside of formal cemeteries?
Discussion
a-c: Although it is not anticipated that there are any impacts to archaeological/cultural resources, implementation of the mitigation measures below will ensure that no impacts will occur.

MM 5.1: In the event that prehistoric cultural materials or historic cultural materials are encountered, work in the immediate vicinity of the finds shall be suspended until reviewed by an archaeologist, and the City shall be notified immediately should such resources be discovered. The archaeologist shall work as quickly as possible to permit resumption of construction activities. It is preferred that location data of finds be recorded using a hand-held global positioning system (GPS) receiver.

If human remains are encountered and determined to be Native American in origin, the San Luis Obispo County coroner will notify the Native American Heritage Commission (NAHC) within 24 hours of the find. The NAHC shall identify the person or persons it believes to be the most likely descendent of the deceased Native American. The most likely descendent may make recommendations for means of treating or disposing of the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 5.2: The note below shall be placed on the grading and improvement plans for the project:
“If human remains (burials) are encountered, the County Coroner shall be contacted immediately (805-781-4513). In the event that previously unidentified potentially significant cultural resources are discovered, an archaeologist shall have the authority to

Page 356 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 23 of 43 ends

divert or temporarily halt ground disturbance operations in the area of discovery to allow evaluation of potentially significant cultural resources in consultation with Northern Chumash Tribal Council. For significant cultural resources, a Research Design and Data Recovery Program to mitigate impacts shall be prepared by the consulting archaeologist and approved by the City, then carried out using professional archaeological methods. If it can be demonstrated that a project will cause damage to a unique archaeological resource, the City may require reasonable efforts to be made to permit any or all of these resources to be preserved in place or left in an undisturbed state.” Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit

6. Geology and Soils
Environmental Setting
The site has varying topographical gradients but generally consist of a 2-5% northeasterly slope. The soils on the Corbett Creek watershed are derived from soft, highly erodible sandstones. High levels of sediment in the creek have come from several locations of erosion and flooding events. The highest profile erosion sources came from the clearing and grading of an upslope property on James Way for a housing development. In 2001, a combination of heavy rains and soils with a high to very high hazard rating for water erosion led to the sedimentation of the James Way stormwater ditch and Corbett Creek, in turn causing flooding to adjacent homes. Homes along Corbett Creek in some cases are as little as twenty feet (20’) from the creek and are not elevated. The sediment was deposited in Corbett Creek, raising the streambed. Sediment accumulation has created marsh-like wetland areas that alter the form and function of the creek, diminishing the in-stream habitat and the conveyance of water and sediment.

In addition to erosion, expansion of the urban fringe, road development and increases in impervious surfaces have resulted in changes in the timing and magnitude of peak flows in the creek. There are small berms in some localized areas along the north side of the active channel built by landowners.

Another factor affecting stream function is a four foot (4’) high head-cut in the creek (as of 2007). If the head-cut was to progress upstream 2,700 feet, approximately 7,000 cubic yards of sediment would mobilize (Swanson Hydrology & Geomorphology, 2008) and be transported downstream to Arroyo Grande Creek, impacting steelhead habitat and increasing flooding challenges in the Zone 1/1A flood control channel.

No active faulting is known to exist on or close to the subject property. The project is not within a known area containing serpentine or ultramafic rock or soils (i.e. low risk of naturally occurring asbestos).

Page 357 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 24 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving:
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map, issued by the State
Geologist for the area, or based on other
substantial evidence of a known fault? (Refer to
Division of Mines and Geology Special Publication

42.)
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including
liquefaction?
iv) Landslides?
b) Result in substantial soil erosion or the loss of
topsoil?
c) Be located on a geologic unit or soil that is unstable, or that would become unstable, as a result of the
project and potentially result in on- or off-site
landslide, lateral spreading, subsidence, liquefaction, or collapse?
d) Be located on expansive soil, as defined in Table 18- 1-B of the Uniform Building Code (1994), creating
substantial risks to life or property?
e) Have soils incapable of adequately supporting the
use of septic tanks or alternative waste disposal
systems, where sewers are not available for the
disposal of waste water?
Discussion
a: No impacts.
b: The project is intended to alleviate risks from increasing head-cuts and deposition of sediment. The project does not alter geotechnical requirements or permit additional construction in geologically sensitive or hazardous areas. The project description integrates development and implementation of both short and long term Best Management Practices (BMPs) to address construction and long term maintenance of the sedimentation basins on the Clark Property, design of the head-cut remediation and BMPs for landowners on the project area.
c-e: No impacts.

Page 358 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 25 of 43 ends

7. Greenhouse Gas (GHG) Emissions
Environmental Setting
The project area includes residential development adjacent to Corbett Creek except at the Village Core where there are four parcels zoned Village Core/Village Mixed Use. The Clark Property is mostly undeveloped and contains a barn, equestrian trails and corals. Project construction is limited to creation of a sedimentation basin and expansion of the floodplain within defined areas. Short term greenhouse gas (GHG) emissions would be generated from equipment used for grading operations and are considered less than significant. There is not an operational phase to this project except for periodic (every 5-10 years) maintenance of the sedimentation basin. Therefore, GHG emissions cease once the initial construction is complete.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Generate greenhouse gas emissions, either directly
or indirectly, that may have a significant effect on the environment?
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of
greenhouse gases?
Discussion
a: The amount of GHG emissions from construction activities do not exceed the cumulative impact thresholds established by the San Luis Obispo County Air Pollution Control District (APCD). It should be noted that Mitigation Measures 3.1 and 3.2 address equipment and idling requirements that have the dual benefit of reducing GHG emissions.
b: No impacts.

8. Hazards and Hazardous Materials
Environmental Setting
There are no known hazards or hazardous materials associated with the project site.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset
and/or accident conditions involving the release of
hazardous materials, substances, or waste into the
environment?

Page 359 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 26 of 43 ends

c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
d) Be located on a site which is included on a list of
hazardous materials sites, compiled pursuant to
Government Code §65962.5, and, as a result, create a
significant hazard to the public or environment?
e) Be located within an airport land use plan or, where such a plan has not been adopted, within two miles of
a public airport or public use airport? If so, would the project result in a safety hazard for people residing or working in the project area?
f) Be located in the vicinity of a private airstrip? If so, would the project result in a safety hazard for people
residing or working in the project area?
g) Impair implementation of or physically interfere
with an adopted emergency response plan or
emergency evacuation plan?
h) Expose people or structures to a significant risk of loss, injury, or death from wildland fires, including
areas where wildlands are adjacent to urbanized areas
or where residences are intermixed with wildlands?
Discussion
b: The project as proposed does not pose a significant hazard to the public or the environment.

However, in the unlikely event that there is an equipment malfunction producing an oil or gas spill, procedures shall be followed as outlined under MM 9.1 (preparation of a Storm Water Pollution Prevention Plan).
a, c- h: No impacts.

9. Hydrology and Water Quality
Environmental Setting
The project area includes the confluence of Corbett and Carpenter Canyon Creeks as well as the confluence of Corbett and Arroyo Grande Creeks. Except for drought years, Corbett Creek maintains perennial flow and meanders from the City limits near Highway 227 to Arroyo Grande Creek in the commercial core of the City’s Village area. It has an active low flow channel/bank full morphology that narrows to approximately two-four feet (2’-4’) wide near Arroyo Grande Creek. The creek travels through the backyards of residences on Tally Ho Road where there is persistent flooding. There is a four foot (4’) high head-cut in the creek that was initially observed by field crews in 2007. If the head-cut were to progress upstream 2,700 feet, approximately 7,000 cubic yards of sediment would mobilize (Swanson Hydrology & Geomorphology, 2008) and be transported downstream to Arroyo Grande Creek, impacting steelhead habitat and increasing flooding challenges in the Zone 1/1A flood control channel.

The project is intended to restore the riparian habitat and provide flood protection.

Construction/grading activities and exposed soil could cause temporary erosion; however, implementation of Best Management Practices (BMPs) that are integrated into the project description and the mitigation measures below will mitigate the impacts to less that significant.

Page 360 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 27 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Violate any water quality standards or waste
discharge requirements?
b) Substantially deplete groundwater supplies or
interfere substantially with groundwater recharge,
such that there would be a net deficit in aquifer
volume or a lowering of the local groundwater table
level (e.g., the production rate of pre-existing nearby wells would drop to a level that would not support
existing land uses or planned uses for which permits
have been granted)?
c) Substantially alter the existing drainage pattern of the site or area, including through alteration of the
course of a stream or river, in a manner which would
result in substantial on- or off-site erosion or siltation? d) Substantially alter the existing drainage pattern of the site or area, including through alteration of the
course of a stream or river, or substantially increase
the rate or amount of surface runoff in a manner
which would result in on- or off-site flooding?
e) Create or contribute runoff water which would
exceed the capacity of existing or planned stormwater
drainage systems or provide substantial additional
sources of polluted runoff?
f) Substantially degrade water quality?
g) Place housing within a 100-year flood hazard area,
as mapped on a federal Flood Hazard Boundary or
Flood Insurance Rate Map, or other flood hazard
delineation map?
h) Place structures that would impede or redirect flood flows within a 100-year flood hazard area?
i) Expose people or structures to a significant risk of loss, injury, or death from flooding, including flooding resulting from the failure of a levee or dam?
j) Result in inundation by seiche, tsunami, or mudflow? Discussion
a, c-f, h-i: Potentially significant impacts from soil erosion and an increase in sediment and turbidity to Arroyo Grande Creek could result from project grading and construction. Potentially significant impacts on hydrology and water quality from construction related activities can be reduced to a less-thansignificant level with implementation of the mitigation measures listed below.

The project site is within a floodway where waters flood onto horse pastures and therefore water quality impacts from equestrian use and manure accumulation may also be a concern. The project may bring surface water more frequently in contact with pastures and manure. However, the project would

Page 361 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 28 of 43 ends

not worsen the water quality situation since no more horses would be added to the site, and some of the area currently used for horse corrals and pasture would be allocated to floodwater detention and riparian habitat enhancement. It is unknown at this time what the water quality impacts from nitrogen or bacteria will be from the project. Water quality monitoring will be carried out as required by the Storm Water Pollution Prevention Plan. The property owner is interested in BMPs to manage manure through composting. These BMPs would reduce potential bacteria pollutant loading, and would be implemented separately from this project. The continued equestrian use is not considered a potentially significant impact.

There is a potential for berm failure that could impact downstream properties. This potential will be addressed through the design process, and applicable design standards will be used.

MM 9.1: The applicant shall prepare a Storm Water Pollution Prevention Plan (SWPPP) and Erosion Control Plan that specifies the implementation of Best Management Practices (BMPs) to avoid and minimize water quality impacts as required by the Regional Water Quality Control Board (RWQCB). At a minimum, the SWPPP and Erosion Control Plan shall include:

Designation of equipment and supply staging and storage areas at least 100 feet from the outside edge of the creek 25-foot setback area. All vehicle parking, routine equipment maintenance, fueling, minor repair, etc., and soil and material stockpile, shall be done only in the designated staging area.

Major vehicle/equipment maintenance, repair, and equipment washing shall be performed off site.

A wet and dry spill cleanup plan that specifies reporting requirements and immediate clean up to ensure no residual soil, surface water or groundwater contamination would remain after clean up.

Designating concrete mixer washout areas at least 100 feet from outside edge of the creek 25-foot setback with the use of appropriate containment or reuse practices.

A temporary and excess fill stockpile and disposal plan that ensures that no detrimental affects to receiving waters would result.

Required site preparation and erosion control BMPs for any work that may need to be completed after October 15.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 9.2: To reduce erosion hazards due to construction activities, grading shall be minimized, and project contractors shall use runoff and sediment control structures, and/or establish a permanent plant cover on side slopes following construction.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Page 362 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 29 of 43 ends

Timing: Prior to issuance of grading permit and during construction MM 9.3: Erosion control and bank stabilization measures shall be implemented for any work that requires access to the creek, subject to CDFW approval through a Streambed Alteration Permit. These measures shall be clearly indicated on the grading plan.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 9.4: All temporary fill placed during project construction shall be removed at project completion and the area restored to approximate pre-project contours and topography.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to final inspection
MM 9.5: The project is located within a regulatory floodway. The applicant shall obtain all required permits from regulatory agencies (City of Arroyo Grande, Regional Water Quality Control Board, US Army Corps of Engineers, Ca. Dept. of Fish and Wildlife, etc.) and meet any relevant FEMA requirements associated with a regulatory floodway as necessary.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
b, g, j: No impacts.

10. Land Use and Planning
Environmental Setting
Surrounding uses are identified on Page 10 of the Initial Study. The proposed project was reviewed for consistency with policy and/or regulatory documents and appropriate land use (Land Use Element, Development Code, and Zoning Map). Outside the channel of Corbett Creek, the Clark Property is zoned for low density residential development at a density of 0.67 dwelling units/acre (a total of up to ten units). This project includes a conservation easement in perpetuity for 12.5 acres leaving a potential residential density of up to two (2) dwelling units. There are several antiquated lots in the project area that have been developed over time and the built density along Corbett Creek exceeds that of the low density residential designation. City policy C/OS 2 states that the City is to “safeguard important environmental and sensitive biological resources contribution to healthy, functioning ecosystems”.

Conserving land for the purposes of localized and downstream flood protection and habitat restoration is consistent with the City’s General Plan.

Page 363 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 30 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Physically divide an established community?
b) Conflict with the applicable land use plan, policy, or regulation of any agency with jurisdiction over the
project (including, but not limited to, a general plan, specific plan, local coastal program, or zoning
ordinance) adopted for the purpose of avoiding or
mitigating an environmental effect?
c) Conflict with any applicable habitat conservation
plan or natural community conservation plan?
Discussion
a-c: No impacts.

11. Mineral Resources
Environmental Setting
The project site is not located within an area known to contain mineral resources. The site is not designated in the 2001 General Plan or identified in the Integrated Program EIR prepared for the General Plan as having locally-important mineral resources. There are no permitted mining operations located within the City limits of Arroyo Grande.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Result in the loss of availability of a known mineral resource that is or would be of value to the region and the residents of the state?
b) Result in the loss of availability of a locally
important mineral resource recovery site delineated
on a local general plan, specific plan, or other land use plan?
Discussion
a-b: No impacts.

12. Noise
Environmental Setting
The project site is primarily located within a low to medium density residential area. Existing ambient noise in the vicinity of the project is primarily generated by vehicular traffic. The Noise Element of the 2001 General Plan includes goals and implementation measures designed to reduce noise impacts on new development, and the City’s Noise Ordinance is the primary implementing tool of the Noise Element through specific noise standards.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact

Page 364 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 31 of 43 ends

a) Generate or expose people to noise levels in excess
of standards established in a local general plan or
noise ordinance, or in other applicable local, state, or federal standards?
b) Generate or expose people to excessive
groundborne vibrations or groundborne noise levels?
c) Create a substantial permanent increase in ambient
noise levels in the vicinity of the project (above levels without the project)?
d) Create a substantial temporary or periodic increase
in ambient noise levels in the vicinity of the project, in excess of noise levels existing without the project?
e) Be located within an airport land use plan or, where such a plan has not been adopted, within two miles of
a public airport or public use airport? If so, would the project expose people residing or working in the
project area to excessive noise levels?
f) Be in the vicinity of a private airstrip? If so, would the project expose people residing or working in the
project area to excessive noise levels?
Discussion
a, d: Noise impacts associated with short term construction are expected to be minimal due to the need for limited surface excavation. Existing ambient noise in the vicinity of the project site is generated by vehicular traffic on Highway 227. The average sound levels during construction could exceed the threshold criteria when equipment is operating. This is considered a potentially significant impact that can be mitigated to a less-than-significant level with implementation of the below mitigation measures. There are no longterm or operational increases to ambient noise levels.

MM 12.1: Construction activities shall be restricted to the hours of 8:00 AM to 5:00 PM Monday through Friday. On-site equipment maintenance and servicing shall be confined to the same hours.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 12.2: All construction equipment utilizing internal combustion engines shall be required to have mufflers that are in good condition. Stationary noise sources shall utilize noise reducing engine housing enclosures or noise screens.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction

Page 365 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 32 of 43 ends

MM 12.3: A note shall be placed on the construction plans that no more than two (2) pieces of major earth moving equipment shall be allowed to operate simultaneously.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 12.4: All residential units located within five hundred feet (500’) of the construction site shall be sent a notice regarding the construction schedule of the project. A clearly legible sign shall also be posted at the project site. All notices and the signs shall indicate the expected dates and duration of construction activities, as well as provide a telephone number that residents can call to resolve any concerns about construction noise.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction b-c, e-f: No impacts.

13. Population and Housing
Environmental Setting
The project site is located within an established low and medium density residential area. Placing 12.5 acres of the roughly 16-acre Clark Property into a conservation easement would appear to reduce the residential development potential. However, because the 12.5-acre property is located within a floodplain area, it is unlikely that housing opportunities are lost. With 3.5 acres remaining of the 16 acre site, two (2) homes could be constructed at a density of 0.67 dwelling units per acre under the Residential Hillside (RH) zoning district. Downstream along the Corbett Creel reach, the only properties with development potential (i.e. vacant) are zoned Village Mixed Use (VMU) and Village Core (VC).

These zoning designations allow commercial and residential development. The proposed project would not impede development of these properties.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Induce substantial population growth in an area,
either directly (for example, by proposing new homes
and businesses) or indirectly (for example, through
extension of roads or other infrastructure)?
b) Displace substantial numbers of existing housing,
necessitating the construction of replacement housing
elsewhere?
c) Displace substantial numbers of people,
necessitating the construction of replacement housing
elsewhere?

Page 366 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 33 of 43 ends

Discussion
a-c: No impacts.

14. Public Services
Environmental Setting
Public services to the project site are readily provided by the City of Arroyo Grande.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Result in significant environmental impacts from
construction associated with the provision of new or
physically altered governmental facilities, or the need for new or physically altered governmental facilities, to maintain acceptable service ratios, response times, or
other performance objectives for any of the public
services:

Fire protection?
Police protection?
Schools?
Parks?
Other public facilities?
Discussion
a: No impacts.

15. Recreation
Environmental Setting
The project site is a private facility with recreational uses and is not a public facility. The property owner utilizes the site primarily for corralling and grazing horses, with most of the site left in vacant open space. The project will not affect any existing private or public parks within the area, either by creating more demand for parks or diminishing the use of parks.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Increase the use of existing neighborhood and
regional parks or other recreational facilities, such that substantial physical deterioration of the facility would occur or be accelerated?
b) Include recreational facilities or require the
construction or expansion of recreational facilities that might have an adverse physical effect on the
environment?

Page 367 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 34 of 43 ends

Discussion
a: No impacts.
b: The site will continue to serve as an equestrian recreational use. The existing facilities will remain, with some reduction in corral and grazing areas (see Exhibit B above under Background and Need for Project).

16. Transportation/Traffic
Environmental Setting
The project site is located within an established low and medium density residential area with access from Highway 227/Carpenter Canyon Road, Corbett Canyon Road, and Tally Ho Road where street parking is available and level of service is acceptable (LOS C or better). The project does not generate any trips that would impact the surrounding street network LOS or the backbone circulation system of the City.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Cause a substantial increase in traffic, in relation to existing traffic and the capacity of the street system
(i.e., a substantial increase in either the number of
vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)?
b) Exceed, individually or cumulatively, the level of
service standards established by the county congestion
management agency for designated roads or
highways?
c) Cause a change in air traffic patterns, including
either an increase in traffic levels or a change in
location, that results in substantial safety risks?
d) Contain a design feature (e.g., sharp curves or a
dangerous intersection) or incompatible uses (e.g.,
farm equipment) that would substantially increase
hazards?
e) Result in inadequate emergency access?
f) Result in inadequate parking capacity?
g) Conflict with adopted policies, plans, or programs
supporting alternative transportation (e.g., bus
turnouts, bicycle racks)?
Discussion
a-g: No impacts.

17. Utilities and Service Systems
Environmental Setting
The project site is located within the incorporated City Limits of Arroyo Grande. Utilities are available from both the City and other regional entities.

Page 368 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 35 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Exceed wastewater treatment restrictions or
standards of the applicable Regional Water Quality
Control Board?
b) Require or result in the construction of new water
or wastewater treatment facilities or expansion of
existing facilities?
Would the construction of these facilities cause
significant environmental effects?
c) Require or result in the construction of new storm
water drainage facilities or expansion of existing
facilities?
d) Have sufficient water supplies available to serve the project from existing entitlements and resources or
are new or expanded entitlements needed?
e) Result in a determination, by the wastewater
treatment provider that serves or may serve the
project, that it has adequate capacity to service the
project’s anticipated demand, in addition to the
provider’s existing commitments?
f) Be served by a landfill with sufficient permitted
capacity to accommodate the project’s solid waste
disposal needs?
g) Comply with federal, state, and local statutes and
regulations as they relate to solid waste?
Discussion
a-g: No impacts.

Page 369 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 36 of 43 ends

Mandatory Findings of Significance
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Substantially degrade the quality of the
environment, substantially reduce the habitat of a fish or wildlife species; cause a fish or wildlife population to drop below self-sustaining levels; threaten to
eliminate a plant or animal community; substantially
reduce the number or restrict the range of an
endangered, rare or threatened species; or eliminate
examples of the major periods of California history or
prehistory?
b) Have the potential to achieve short-term
environmental goals to the disadvantage of long-term
environmental goals?
c) Have possible environmental effects that are
individually limited but cumulatively considerable?
“Cumulatively considerable” means that the
incremental effects of an individual project are
significant when viewed in connection with the effects
of past projects, the effects of other current projects, and the effects of possible future projects.
d) Cause substantial adverse effects on human beings,
either directly or indirectly?
Discussion
a, c-d: The project is located within an established low and medium density residential area. The purpose of the project is to reduce flooding downstream and will enhance a wetland habitat area.

Isolated prehistoric materials may be present on the project site; however, the site does not serve as an example of a major period of California history or prehistory. The project will not cumulatively increase traffic or the demand for public services and utilities. With implementation of the proposed mitigation measures, the project will not cause substantial adverse effects on human beings or special status plant or animal species, either directly or indirectly.
b: No impacts.

Page 370 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 37 of 43 ends

Summary of Mitigation Measures
MM 3.1: The following conditions shall be included on all project plans and adhered to for all grading-related permits:

Reduce the amount of disturbed area where possible.

Use water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increase watering frequency when wind speeds exceed 15 MPH.

Reclaimed (non-potable) water shall be used whenever possible.

All dirt stockpile areas should be sprayed daily or as needed using reclaimed (nonpotable) water when feasible.

Exposed ground areas that are planned to be reworked more than one (1) month after initial grading should be sown with a fast-germinating native grass seed and watered until vegetation is established.

All areas to be paved (i.e. access road to the sediment basin) should be completed as soon as possible.

All trucks hauling dirt, sand, soil or other loose materials are to be covered or shall maintain at least two (2) feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with CVC Section 23114.

Streets shall be swept at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed (non-potable) water should be used where feasible.

Diesel idling shall not be permitted.

Signs that specify the no idling requirement shall be posted and enforced at the construction site.

Use of alternative-fueled equipment is recommended whenever possible.

The contractor shall designate a person or persons to monitor and implement these measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity and to prevent the transport of dust off-site. The name and telephone number of such persons shall be provided to the Air Pollution Control District (APCD) prior to the start of any grading-related activities. (See MM 9.1 for erosion control measures).

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 3.2: All portable equipment (50 horsepower or greater) used during grading operations must be issued a permit by either the California Air Resources Board (CARB) or the APCD. (Contact the APCD Engineering Division at (805) 781-5912 for specific information regarding permitting requirements prior to start of the project).

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction

Page 371 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 38 of 43 ends

MM 4.1: Construction/grading shall take place after the breeding season for the Yellow Warbler (April – July) to limit noise impacts. If construction/grading must start during this time period, surveys of nesting birds within the project vicinity shall be completed by a qualified wildlife biologist. If the surveys identify active nests of the Yellow Warbler within the project vicinity, all earthmoving activities shall cease until the chicks have fledged. The biologist shall provide the lead agency and responsible agencies with a written report of survey findings, and shall specify when the project work may safely commence.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 4.2: A qualified wildlife biologist shall complete and submit to the lead agency and responsible agencies a pre-construction survey for California red-legged frogs and Southwestern pond turtles. The survey shall be conducted during the time period when these species are known to be active. If no individuals are found, construction may proceed. If individuals are found during the initial investigation, the biologist shall conduct clearance surveys for these species approximately one (1) week prior to construction. Individuals found within the construction area will either be relocated to similar, adjacent habitats at least fifty (50) yards outside of the project area, or held in captivity until construction is complete. The project area shall be monitored during construction and appropriate measures taken to ensure that the individuals of relocated species do not move into the construction area. The decision of whether to relocate the animals shall be made by the biologist, although all mitigation activities would have to occur within the framework of any permits issued by the USFWS and CDFG.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 4.3: A qualified botanist shall conduct an initial site survey to map occurrence of Hoover’s bent grass, San Bernardino aster and black-flowered figwort. If sensitive plant species are found on site and determined to be potentially impacted, the botanist shall prepare procedures that ensure no net loss of plants. These include, but are not limited to, designating avoidance areas, transplanting the plant populations to an equivalent location on site, or replaced in-kind with new plants at a ratio of two (2) plants replaced for each one (1) lost or at a ratio acceptable to the botanist. The transplanted or replaced plants shall be monitored over a five (5) year period.

Any plants lost during this time period shall be replaced. The botanist shall prepare a planting, irrigation and maintenance plan that includes these provisions. If the botanist concludes that avoidance is a viable option, locations determined to be potentially impacted will be flagged against inadvertent or unintentional damage.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit

Page 372 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 39 of 43 ends

MM 4.4: The applicant shall acquire appropriate resource agency permits and undertake protection measures as required by those agencies.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 5.1: In the event that prehistoric cultural materials or historic cultural materials are encountered, work in the immediate vicinity of the finds shall be suspended until reviewed by an archaeologist, and the City shall be notified immediately should such resources be discovered. The archaeologist shall work as quickly as possible to permit resumption of construction activities. It is preferred that location data of finds be recorded using a hand-held global positioning system (GPS) receiver.

If human remains are encountered and determined to be Native American in origin, the San Luis Obispo County coroner will notify the Native American Heritage Commission (NAHC) within 24 hours of the find. The NAHC shall identify the person or persons it believes to be the most likely descendent of the deceased Native American. The most likely descendent may make recommendations for means of treating or disposing of the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 5.2: The note below shall be placed on the grading and improvement plans for the project:
“If human remains (burials) are encountered, the County Coroner shall be contacted immediately (805-781-4513). In the event that previously unidentified potentially significant cultural resources are discovered, an archaeologist shall have the authority to divert or temporarily halt ground disturbance operations in the area of discovery to allow evaluation of potentially significant cultural resources in consultation with Northern Chumash Tribal Council. For significant cultural resources, a Research Design and Data Recovery Program to mitigate impacts shall be prepared by the consulting archaeologist and approved by the City, then carried out using professional archaeological methods. If it can be demonstrated that a project will cause damage to a unique archaeological resource, the City may require reasonable efforts to be made to permit any or all of these resources to be preserved in place or left in an undisturbed state.” Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit

Page 373 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 40 of 43 ends

MM 9.1: The applicant shall prepare a Storm Water Pollution Prevention Plan (SWPPP) and Erosion Control Plan that specifies the implementation of Best Management Practices (BMPs) to avoid and minimize water quality impacts as required by the Regional Water Quality Control Board (RWQCB). At a minimum, the SWPP and Erosion Control Plan shall include:

Designation of equipment and supply staging and storage areas at least 100 feet from the outside edge of the creek 25-foot setback area. All vehicle parking, routine equipment maintenance, fueling, minor repair, etc., and soil and material stockpile, shall be done only in the designated staging area.

Major vehicle/equipment maintenance, repair, and equipment washing shall be performed off site.

A wet and dry spill cleanup plan that specifies reporting requirements and immediate clean up to ensure no residual soil, surface water or groundwater contamination would remain after clean up.

Designating concrete mixer washout areas at least 100 feet from outside edge of the creek 25-foot setback with the use of appropriate containment or reuse practices.

A temporary and excess fill stockpile and disposal plan that ensures that no detrimental affects to receiving waters would result.

Required site preparation and erosion control BMPs for any work that may need to be completed after October 15.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 9.2: To reduce erosion hazards due to construction activities, grading shall be minimized, and project contractors shall use runoff and sediment control structures, and/or establish a permanent plant cover on side slopes following construction.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 9.3: Erosion control and bank stabilization measures shall be implemented for any work that requires access to the creek, subject to CDFW approval through a Streambed Alteration Permit. These measures shall be clearly indicated on the grading plan.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction

Page 374 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 41 of 43 ends

MM 9.4: All temporary fill placed during project construction shall be removed at project completion and the area restored to approximate pre-project contours and topography.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to final inspection
MM 9.5: The project is located within a regulatory floodway. The applicant shall obtain all required permits from regulatory agencies (City of Arroyo Grande, Regional Water Quality Control Board, US Army Corps of Engineers, Ca. Dept. of Fish and Wildlife, etc.) and meet any relevant FEMA requirements associated with a regulatory floodway as necessary.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 12.1: Construction activities shall be restricted to the hours of 8:00 AM to 5:00 PM Monday through Friday. On-site equipment maintenance and servicing shall be confined to the same hours.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 12.2: All construction equipment utilizing internal combustion engines shall be required to have mufflers that are in good condition. Stationary noise sources shall utilize noise reducing engine housing enclosures or noise screens.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 12.3: A note shall be placed on the construction plans that no more than two (2) pieces of major earth moving equipment shall be allowed to operate simultaneously.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction

Page 375 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 42 of 43 ends

MM 12.4: All residential units located within five hundred feet (500’) of the construction site shall be sent a notice regarding the construction schedule of the project. A clearly legible sign shall also be posted at the project site. All notices and the signs shall indicate the expected dates and duration of construction activities, as well as provide a telephone number that residents can call to resolve any concerns about construction noise.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction

Page 376 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 43 of 43 ends

References
Documents & Maps

1. Arroyo Grande General Plan

2. Arroyo Grande Municipal Code

3. Arroyo Grande Zoning Map

4. Arroyo Grande Existing Settings Report & Draft Arroyo Grande Existing Settings Report (2010)

5. Arroyo Grande Urban Water Management Plan

6. Arroyo Grande Stormwater Management Plan

7. San Luis Obispo Important Farmland Map (California Department of Conservation, 2006)

8. CEQA & Climate Change White Paper (CAPCOA, 2008)

9. Air Quality Handbook (SLO APCD, 2009)

10. Project Plans – Swanson Hydrology & Geomorphology

11. Site Inspection

12. Arroyo Grande Creek Erosion, Sedimentation and Flooding Alternatives Study, Swanson Hydrology & Geomorphology, January 4, 2006

13. Letter from the Natural Resources Conservation Service regarding land eligibility report for Clark WRO Offering, dated December 19, 2006

Page 377 of 1114 ends

MITIGATION MONITORING

AND REPORTING PROGRAM (MMRP)
______________________________________________
Staff Project No. 13-001
Corbett Creek Floodplain and Stream Restoration Project ADOPTED BY:

CITY OF ARROYO GRANDE

PLANNING COMMISSION
DATE:

APRIL 16, 2013

EXHIBIT D

Page 378 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013
2 Introduction
A Mitigated Negative Declaration (MND) was prepared to comply with the California Environmental Quality Act (CEQA) for the Corbett Creek Floodplain and Stream Restoration Project (the “Project”). The MND identified potential environmental impacts as well as mitigation measures to reduce the impacts, where feasible.

CEQA requires that mitigation measures identified in environmental review documents are implemented after a project is approved. Therefore, this Mitigation Monitoring and Reporting Program (MMRP) has been prepared to ensure compliance with the adopted mitigation measures during the pre-construction, construction, and post-construction phases of the Project. The mitigation measures listed herein will be adopted by the Arroyo Grande Planning Commission as part of the overall project approval.

Per Public Resources Code Section 21081.6 the measures listed in the table below constitute the mitigation monitoring and/or reporting program that will reduce potentially significant impacts to less than significant levels. These measures will become conditions of approval (COAs) should the project be approved. The Lead Agency (City of Arroyo Grande) or other Responsible Agencies, as specified in the following measures, are responsible to verify compliance with these COAs.

Mitigation is defined by the California Environmental Quality Act (CEQA) as a measure which:
 Avoids the impact altogether by not taking a certain action or parts of an action.  Minimizes impacts by limiting the degree or magnitude of the action and its implementation.
 Rectifies the impact by repairing, rehabilitating, or restoring the impacted environment.
 Reduces or eliminates the impact over time by preservation and maintenance operations during the life of the Project.
 Compensates for the impact by replacing or providing substitute resources or environments.

The mitigation measures discussed in the table below have been identified as feasible and effective in mitigating Project-related environmental impacts.

Project Location
The project reach begins at the Highway 227 Bridge over Tally Ho Creek and extends upstream to the east end of the Clark property (APN 007-791-032).

Project Description
The proposed project involves the acquisition by the Coastal San Luis Resource Conservation District (RCD) of a conservation easement over the 12.5-acre Clark Property located between Highway 227 (Carpenter Canyon Road) and Corbett Canyon Road and the design, permitting and construction of a floodplain/sediment detention basin on the easement property. The project also includes channel restoration of approximately nine hundred feet (900’) of Corbett Creek located downstream of the

Page 379 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013
3 Clark Property. Currently there are no identified implementation funds for the channel restoration component of the project. The City will be directly involved in the project through permitting of the floodplain/sediment detention basin design and implementation activities.

The Project goals are:

1. Increase sediment capture on floodplain easement

2. Increase flood attenuation on floodplain easement

3. Enhance floodplain wetland for flood attenuation and habitat The Project will construct a sediment basin and enhance a floodplain wetland resulting in an estimated 524 tons of sediment per year settled into a basin, reduced peak flows in storms with recurrence intervals of ten (10) years or greater, and three (3) acres of floodplain wetland enhanced.

Program Implementation and Monitoring
Each mitigation measure is described in the following format:

Requirements of
Measure
The description of the mitigation measures.

Mitigation Level The level to which the impact is anticipated to be mitigated.

Implementing
Responsibility
The agency or individual that has the responsibility for implementing or performing the measure.

Monitoring
Responsibility
The public agency that has the responsibility for monitoring to ensure that the mitigation measure is effective in mitigating the impact.

Compliance
Standards
The method used to verify compliance.

Timing The appropriate points in time at which the mitigation measure is to be initiated and completed.

Page 380 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 4 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
Air Quality3.1 The following conditions shall be
included on all project plans and
adhered to for all grading‐related
permits:
 Reduce the amount of disturbed
area where possible.
 Use water trucks or sprinkler
systems in sufficient quantities to
prevent airborne dust from leaving
the site. Increase wateringfrequency when wind speeds
exceed 15 MPH. Reclaimed (non‐
potable) water shall be usedwhenever possible.
 All dirt stockpile areas should be
sprayed daily or as needed using
reclaimed (non‐potable) water
when feasible.
 Exposed ground areas that are
planned to be reworked more
than one (1) month after initial
grading should be sown with a
fast‐germinating native grass seed
and watered until vegetation isestablished.
 All areas to be paved (i.e. access
road to the sediment basin) shouldbe completed as soon as possible.

Less thansignificantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Initial site check to
ensure measures are in
place. Bi‐weekly site
checks to ensure
construction area isswept or wateredregularly.

Prior to
issuance ofgrading
permit and
duringconstruction.

Page 381 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 5 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
 All trucks hauling dirt, sand, soil or
other loose materials are to be
covered or shall maintain at least
two (2) feet of freeboard
(minimum vertical distance
between top of load and top of
trailer) in accordance with CVC
Section 23114.
 Streets shall be swept at the end
of each day if visible soil material
is carried onto adjacent pavedroads. Water sweepers with reclaimed (non‐potable) water
should be used where feasible.
 Diesel idling shall not be
permitted.
 Signs that specify the no idling
requirement shall be posted and
enforced at the construction site.
 Use of alternative‐fueled
equipment is recommended
whenever possible.
 The contractor shall designate a
person or persons to monitor and
implement these measures as
necessary to minimize dustcomplaints, reduce visibleemissions below 20% opacity andto prevent the transport of dust

Page 382 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 6 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
off‐site. The name and telephone
number of such persons shall beprovided to the Air Pollution Control District (APCD) prior to the
start of any grading‐relatedactivities. (See MM 9.1 for erosion control measures).

3.2 All portable equipment (50
horsepower or greater) used during
grading operations must be issued a
permit by either the California Air
Resources Board (CARB) or the APCD.
(Contact the APCD Engineering
Division at (805) 781‐5912 for specific
information regarding permitting
requirements prior to start of theproject).

Less than
significant
impact
ConstructionManager
City of A.G.,CommunityDevelopmentDept.

Project plans shall
indicate type and
horsepower of proposed
equipment used during
grading operations.

Follow up with APCD if
necessary.

Prior to
issuance ofgradingpermit and
duringconstruction.

Biological Resources4.1 Construction/grading shall take place after the breeding season for the
Yellow Warbler (April – July) to limit
noise impacts. If onstruction/grading
must start during this time period,
surveys of nesting birds within the
project vicinity shall be completed by
a qualified wildlife biologist. If the
surveys identify active nests of the
Less thansignificantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
The Construction
Manager shall inform the
Community Development
Dept. when grading
activities are expected to
commence. If gradingmust occur between
April and July, pre‐
construction biological
Prior to
issuance ofgradingpermit.

Page 383 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 7 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
Yellow Warbler within the project
vicinity, all earthmoving activities
shall cease until the chicks have
fledged. The biologist shall provide
the lead agency and responsibleagencies with a written report ofsurvey findings, and shall specifywhen the project work may safely commence.
surveys shall be
submitted to the City,
CSRCD, CDFW and FWS
prior to issuance of
grading permit.

4.2 A qualified wildlife biologist shall
complete and submit to the lead
agency and responsible agencies a
pre‐construction survey for California
red‐legged frogs and Southwestern
pond turtles. The survey shall be
conducted during the time periodwhen these species are known to be active. If no individuals are found,
construction may proceed. If
individuals are found during the
initial investigation, the biologist shall
conduct clearance surveys for thesespecies approximately one (1) week prior to construction. Individuals
found within the construction area
will either be relocated to similar,
adjacent habitats at least fifty (50)yards outside of the project area, or Less thansignificant
impact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Pre‐constructionbiological surveys shall
be conducted accordingto the mitigation
language and submitted
to the City, CSRCD, CDFW
and FWS prior to
issuance of grading
permit. If individuals ofspecial status species arefound, a biologist shall be retained to prepare
recommendations and
monitor the project area
during construction.

Prior to
issuance ofgradingpermit and
duringconstruction.

Page 384 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 8 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
held in captivity until construction is
complete. The project area shall bemonitored during construction and appropriate measures taken to
ensure that the individuals of
relocated species do not move into
the construction area. The decision
of whether to relocate the animals
shall be made by the biologist,although all mitigation activities would have to occur within the
framework of any permits issued bythe USFWS and CDFG.

4.3 A qualified botanist shall conduct an
initial site survey to map occurrence
of Hoover’s bent grass, San
Bernardino aster and black‐floweredfigwort. If sensitive plant species are found on site and determined to be
potentially impacted, the botanist
shall prepare procedures that ensureno net loss of plants. These include, but are not limited to, designating
avoidance areas, transplanting theplant populations to an equivalent location on site, or replaced in‐kind
with new plants at a ratio of two (2)
plants replaced for each one (1) lost
Less thansignificantimpact
ConstructionManager
City of A.G.,
CommunityDevelopment
Department
Pre‐constructionbotanical surveys shall be
conducted according to
the mitigation languageand submitted to theCity, CSRCD, CDFW and FWS prior to issuance of
grading permit. Ifindividuals of special
status plant species are
found, a botanist shall be
retained to prepare
recommendations.

Prior to
issuance of
gradingpermit.

Page 385 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 9 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
or at a ratio acceptable to the
botanist. The transplanted or
replaced plants shall be monitored
over a five (5) year period. Anyplants lost during this time period shall be replaced. The botanist shallprepare a planting, irrigation andmaintenance plan that includes these provisions. If the botanist concludes
that avoidance is a viable option,
locations determined to be
potentially impacted will be flagged
against inadvertent or unintentional
damage.

4.4 The applicant shall acquire
appropriate resource agency permits
and undertake protection measuresas required by those agencies.

Less thansignificantimpact
Coastal SanLuis ResourceConservationDistrict(CSRCD)
City of A.G.,
CommunityDevelopmentDepartment
CSRCD shall provide the
City with applicable
resource agency permits.

Prior to
issuance of
grading
permit.

Cultural Resources5.1 In the event that prehistoric cultural materials or historic cultural
materials are encountered, work in
the immediate vicinity of the finds
shall be suspended until reviewed by
an archaeologist, and the City shall
be notified immediately should such
Less than
significantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
The mitigation measure
language shall beincluded on theconstructionspecifications.

Duringconstruction.

Page 386 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 10 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
resources be discovered. Thearchaeologist shall work as quickly aspossible to permit resumption of construction activities. It is preferred
that location data of finds be
recorded using a hand‐held global
positioning system (GPS) receiver.

If human remains are encountered
and determined to be Native
American in origin, the San Luis
Obispo County coroner will notify the
Native American Heritage
Commission (NAHC) within 24 hours
of the find. The NAHC shall identifythe person or persons it believes to be the most likely descendent of the
deceased Native American. The most
likely descendent may make
recommendations for means of
treating or disposing of the human
remains and any associated gravegoods as provided in Public Resources Code Section 5097.98.

5.2 The note below shall be placed on
the grading and improvement plans
for the project:

Less than
significantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Mitigation measure shall
be included on the
constructionspecifications.

Prior to
issuance of
gradingpermit.

Page 387 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 11 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
“If human remains (burials) are
encountered, the County Coroner
shall be contacted immediately (805‐
781‐4513). In the event that
previously unidentified potentially
significant cultural resources are
discovered, an archaeologist shall
have the authority to divert or
temporarily halt ground disturbanceoperations in the area of discovery to allow evaluation of potentially
significant cultural resources inconsultation with Northern ChumashTribal Council. For significant cultural resources, a Research Design and
Data Recovery Program to mitigateimpacts shall be prepared by the consulting archaeologist and
approved by the City, then carried out
using professional archaeologicalmethods. If it can be demonstrated that a project will cause damage to a
unique archaeological resource, theCity may require reasonable efforts tobe made to permit any or all of these resources to be preserved in place or
left in an undisturbed state.”

Page 388 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 12 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
Hydrology and Water Quality9.1 The applicant shall prepare a Storm Water Pollution Prevention Plan
(SWPPP) and Erosion Control Plan
that specifies the implementation of
Best Management Practices (BMPs)
to avoid and minimize water qualityimpacts as required by the Regional Water Quality Control Board(RWQCB). At a minimum, the SWPPP and Erosion Control Plan shall
include: Designation of equipment and
supply staging and storage areasat least 100 feet from the outside edge of the creek 25‐foot setbackarea. All vehicle parking, routineequipment maintenance, fueling,minor repair, etc., and soil and material stockpile, shall be done
only in the designated staging
area.
 Major vehicle/equipment
maintenance, repair, and
equipment washing shall be
performed off site.
 A wet and dry spill cleanup plan
that specifies reportingrequirements and immediate
Less thansignificantimpact
ConstructionManager
City of A.G.,CommunityDevelopment
Department
Prepare SWPPP as
indicated and implement
BMPs as required.

Prior to
issuance of
gradingpermit and
duringconstruction.

Page 389 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 13 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
clean up to ensure no residual soil,surface water or groundwater contamination would remain afterclean up.
 Designating concrete mixer
washout areas at least 100 feet
from outside edge of the creek 25‐foot setback with the use of appropriate containment or reuse
practices.
 A temporary and excess fill
stockpile and disposal plan that
ensures that no detrimental
affects to receiving waters would
result.
 Required site preparation and
erosion control BMPs for any work
that may need to be completed
after October 15.

9.2 To reduce erosion hazards due to
construction activities, grading shall
be minimized, and project
contractors shall use runoff and
sediment control structures, and/or
establish a permanent plant cover on
side slopes following construction.

Less than
significantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Ensure runoff andsediment control
measures are on thegrading plan and in place
prior to grading activities.

Prior to
issuance ofgradingpermit and
during
construction.

Page 390 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 14 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)

9.3 Erosion control and bank stabilization
measures shall be implemented for
any work that requires access to the
creek, subject to CDFW approval
through a Streambed Alteration
Permit. These measures shall be
clearly indicated on the grading plan.

Less than
significantimpact
Coastal SanLuis ResourceConservationDistrict(CSRCD)
City of A.G.,
CommunityDevelopmentDepartment
Ensure erosion control
and bank stabilization
measures are on thegrading plan and in place
prior to grading activities.If required by CDFW, aStreambed AlterationPermit shall be approved and a copy of the permitshall be submitted to the
City.

Prior to
issuance of
gradingpermit and
duringconstruction.

9.4 All temporary fill placed during
project construction shall be removed
at project completion and the area
restored to approximate pre‐project
contours and topography.

Less than
significantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
The grading plan shall
indicate all proposed
temporary fill areas.Removal of temporary fill
areas shall be verified
prior to final inspection.

Prior to final
inspection.

9.5 The project is located within a
regulatory floodway. The applicant
shall obtain all required permits fromregulatory agencies (City of ArroyoGrande, Regional Water Quality Control Board, US Army Corps of
Engineers, Ca. Dept. of Fish and
Wildlife, etc.) and meet any relevantFEMA requirements associated with a regulatory floodway as necessary.

Less thansignificant
impact
Coastal San
Luis ResourceConservation
District(CSRCD)
City of A.G.,
CommunityDevelopmentDepartment
A copy of all necessary
resource agency permits
shall be submitted to the
City.

Prior to
issuance of
gradingpermit.

Page 391 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 15 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
Noise12.1 Construction activities shall be
restricted to the hours of 8:00 AM to
5:00 PM Monday through Friday.

On‐site equipment maintenance and
servicing shall be confined to the
same hours.

Less than
significantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Ensure adherence to
construction hours.

Duringconstruction.

12.2 All construction equipment utilizing
internal combustion engines shall berequired to have mufflers that are in good condition. Stationary noise
sources shall utilize noise reducingengine housing enclosures or noise screens.

Less thansignificantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Ensure use of mufflers
and other attenuation
devices.

Duringconstruction.

12.3 A note shall be placed on the
construction plans that no more than
two (2) pieces of major earth moving
equipment shall be allowed to
operate simultaneously.

Less than
significantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Ensure note is on the
plans and measure isadhered to during site
inspections.

Prior to
issuance ofgrading
permit and
duringconstruction.

12.4 All residential units located within
five hundred feet (500’) of the
construction site shall be sent a
notice regarding the construction
schedule of the project. A clearly
legible sign shall also be posted at the
project site. All notices and the signs
Less than
significantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Send notices, post sign
and designate a City staffperson to respond to anynoise concerns.

Prior to
issuance ofgradingpermit and
duringconstruction.

Page 392 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 16 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
shall indicate the expected dates and
duration of construction activities, aswell as provide a telephone numberthat residents can call to resolve anyconcerns about construction noise.

Page 393 of 1114 ends

Corbett Creek Floodplain and Stream Restoration
Project
Addendum to the
2013 Initial Study / Mitigated Negative Declaration
SCH# 2013031045
Prepared by
Coastal San Luis Resource Conservation District
1203 Main St, Ste B, Morro Bay CA, 93442
April 2023

EXHIBIT E

Page 394 of 1114 ends

Table of Contents
Table of Contents 2
Introduction 2
Previous Environmental Review 4
Corbett Creek Floodplain and Stream Restoration Project 6

1. Project Title 6

2. Lead Agency Name and Address 6

3. Contact Person and Phone Number 6

4. Project Location 6

5. Project sponsor's name and address 7

6. General Plan Designation 7

7. Zoning Designation 7

8. Description of Project 7

9. Surrounding Land Uses and Setting 9

10. Required Approvals 11

11. California Native American Tribal Consultation (AB 52) 11 Potential Impacts of Revised Project 11
Determination 14
References 14
Appendix A: 50% designs for Sediment Basin and Wetland Creation Project Appendix B: 65% designs for Stream Channel Restoration
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 395 of 1114 ends

Introduction
This document is an Addendum to the 2013 Corbett Creek Floodplain and Stream Restoration Project Initial Study and Mitigated Negative Declaration (MND) prepared in compliance with the California Environmental Quality Act (CEQA) of 1970, Public Resources Code §21000, et seq., as amended, and implementing CEQA Guidelines, Title 14, Chapter 3 of the California Code of Regulations. The 2013 Corbett Creek Floodplain and Stream Restoration Project MND evaluated the acquisition of a floodplain easement on Corbett Creek as well as the restoration of approximately 900 feet of stream channel downstream of the floodplain easement.

The purpose of this Addendum is to analyze the environmental impacts of the Corbett Creek Floodplain and Stream Restoration Project, herein referred to as the “updated project.” The updated project includes more detailed engineered design plans that more accurately define project impacts. The approved project, evaluated in the 2013 MND, included 50% conceptual engineered design plans with approximate impacts. The updated project location and technical approach does not differ from the approved project. Item 7, Description of Project, of this addendum defines the revised project and describes the proposed changes in detail.

The City of Arroyo Grande assumed the role of Lead Agency for the development of the 2013 MND. Due to changes in project roles, the Coastal San Luis Resource Conservation District (CSLRCD) took over the role of Lead Agency for this project in 2023.

This Addendum has been prepared in accordance with the relevant provisions of CEQA and the CEQA Guidelines. According to Section 15164(b) of the CEQA Guidelines, an addendum to a Negative Deceleration is the appropriate environmental document in instances when “only minor technical changes or additions are necessary or none of the conditions described in Section 15261 calling for the preparation of a subsequent Negative Deceleration have occurred.” Section 15162(a) of the CEQA Guidelines states no subsequent Negative Deceleration shall be prepared for a project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following:

1. Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;

2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or Negative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 396 of 1114 ends

3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the Negative Declaration was adopted, shows any of the following:

A. The project will have one or more significant effects not discussed in the previous MND, B. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
C. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or D. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

The increased detail included in the updated project are minor in the sense they would not create potentially significant environmental impacts in addition to those already identified in the 2013 MND for the approved Corbett Creek Floodplain and Stream Restoration Project. The updated project would also not substantially increase the magnitude or severity of impacts that were previously identified. This addendum includes a description of the updated project, and a discussion of the environmental impacts of the proposed project change, focusing on Air Quality, Biological Resources, Tribal Cultural Resources, Energy, Hydrology and Water Quality, and Noise.

CSLRCD Board of Directors shall consider this addendum with the 2013 Corbett Creek Floodplain and Creek Restoration Project MND prior to making a CEQA decision on the updated project. The 2013 Corbett Creek Floodplain and Creek Restoration Project MND is available for review at the CSLRCD offices, located at 1203 Main Street, suite B, in Morro Bay, 93442.

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 397 of 1114 ends

Previous Environmental Review
This section provides an overview of the 2013 Corbett Creek Floodplain and Creek Restoration Project MND, to provide context for this addendum
2013 Corbett Creek Floodplain and Creek Restoration Project MND The 2013 Corbett Creek Floodplain and Creek Restoration Project MND evaluates the potential environmental effects of the acquisition of a 12.5-acre conservation easement, the design and construction of a sedimentation and flood reduction basin on the easement property, as well as an analysis of a proposed sediment removal and creek restoration project downstream along Corbett Creek intended to reduce flooding in that area. The project begins at the East Branch Street culvert and extends upstream approximately one (1) mile to the north end of the Clark Property (APN 007-791-032).

A conservation easement and sedimentation reduction project is being sought on the subject property as a strategic location to carry out inter-related goals of the California Department of Water Resources Flood Protection Corridor Program and the City of Arroyo Grande’s goals stated in the Conservation/Open Space and Agricultural Element of the 2001 General Plan and 2007 Creek Resources Protection Study.

The 2013 MND found that the following factors would be potentially affected by the project:

Air Quality: Analysis of project impacts determined that emissions associated with project construction could affect adjacent properties and would add to the cumulatively significant effect that results in basin-wide exceedance of air quality standards. These temporary fugitive dust and combustion emissions can impact local air quality. Adopted mitigation measures MM3.1 and MM3.2 prescribe several actions to reduce emissions to less than significant.

Biological Resources: Analysis of biological resources present in the project area determined that adverse effects on sensitive species, including California red-legged frog, and riparian habitats would be less than significant with mitigation. Adopted measures include avoiding nesting and mating seasons for present sensitive species, pre-construction surveys, and appropriate regulatory permitting.

Cultural Resources: Analysis of project impacts determined that adverse change in the significance of an archaeological resource could be less than significant with mitigation. Adopted measures include suspending work and contacting appropriate authorities if resources are encountered.

Hydrology/Water Quality: Analysis of hydrology and water resources within the project area determined that project activities, including grading and filling could degrade or violate water quality and waste discharge requirements, or alter existing drainage patterns resulting in erosion or flooding. Analysis also determined that the project had the potential to impede or redirect flood flows within a 100-year flood hazard area and expose people or structures to a significant risk of loss, Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 398 of 1114 ends

injury, or death from flooding. Potentially significant impacts on hydrology and water quality from construction related activities can be reduced to a less-than-significant level with implementation of the several mitigation measures, including adoption of a project-specific Stormwater Pollution Prevention Plan, establishment of permanent vegetation cover after project completion, installation of erosion control practices during and following construction, and compliance with any and all applicable regulation associated with floodway management.

Noise: Analysis of project impacts determined that the residents adjacent to the project area may be exposed to noise levels in excess of established standards and that the project may generate periodic or temporary increases in ambient noise levels. Noise impacts associated with short term construction are expected to be minimal, and adopted mitigation measures, including restricted work windows and engine mufflers will reduce impacts to less than significant.

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 399 of 1114 ends

Corbett Creek Floodplain and Stream
Restoration Project

1. Project Title
Corbett Creek Floodplain and Stream Restoration Project

2. Lead Agency Name and Address
Coastal San Luis Resource Conservation District
1203 Main St. Suite B Morro Bay, CA 93442
(805)772-4391

3. Contact Person and Phone Number
Hallie Richard, Conservation Programs Manager
805-772-4391, [email protected]

4. Project Location

1. Floodplain Easement: APN 007-791-032 (Clark Property)

2. Stream Restoration (APNs: 007-211-013, 007-211-007, 007-211-038, 007-211-030, 007-211-029, 007-252-013) See figure 1 below.

5. Project sponsor's name and address
Coastal San Luis resource Conservation District
1203 Main St, Ste B
Morro Bay, CA 93442

6. General Plan Designation

1. Low Density Residential (LD); Conservation Open Space (C/OS)

2. Low-Medium Density Residential (LM); Conservation Open Space (C/OS)

7. Zoning Designation

1. Residential Hillside (RH); Public Facility (PF) (combining designation for the portion of the property containing the creek channel)

2. Residential Suburban (RS); Single Family (SF); Village Mixed Use (VMU); Village Core Downtown (VCD); Public Facility (PF) (combining designations for portions of properties containing the creek channel)
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 400 of 1114 ends

8. Description of Project
The project scope includes the acquisition of a conservation easement and design and implementation of a sediment reduction project for the purpose of floodplain restoration, sediment capture and peak flow attenuation along specific reaches of Corbett Creek. The sediment reduction project includes two distinct components:

1. CSLRCD has acquired a conservation easement in perpetuity over 12.50 acres of the 15.79 acre Clark Property at the confluence of Carpenter Creek and Corbett Creek to act as a floodplain and thereby attenuate peak flows. The conservation easement area will be used to construct a sediment basin, a floodwater detention area and a riparian habitat enhancement area (Appendix A). These easement acquisition and construction components of the project are identified in a technical study (Swanson Hydrology and Geomorphology, 2006) as critical to alleviating flooding on Corbett Creek and reducing stress on lower Arroyo Grande Creek through the reduction of peak flows and fine sediment. These project components have also been identified as providing an important location upon which to restore riparian and floodplain habitat within an urban wildlife corridor. Final engineering design, permitting, implementation and monitoring are anticipated to be completed using grant funds obtained from the Department of Water Resources (DWR) through the Urban Streams Restoration Program or State Coastal Conservancy. Secured funding is contingent upon commitment from project beneficiaries (City of Arroyo Grande, SLO Co Flood Control Zones 3 and 1/1A) for long-term maintenance of the sediment basins. The estimated sediment delivery reduction provided by the site is approximately nine hundred (900) tons per year. Specific elements of the project include the following: (1) Conservation easement acquisition. (2) Sedimentation reduction through construction of active and passive sedimentation basins. (3) Long-term and regular maintenance of basins and removal of accumulated sediments.

2. Planning, design and implementation of a channel restoration project to re-establish the channel geometry of approximately two-hundred seventy feet (270’) of Corbett Creek (aka Tally Ho Creek) (Reach 3), thereby increasing flow volumes and reducing storm flow water surfaces. Beginning at the 4’ headcut at station 18+60, a rock weir will be installed, armoring the headcut and lessening the steep grade. Following upstream from the rock weir, a low flow channel would be excavated through sediment that has built up over the years along Reach 3. According to the Tally Ho Tech Memo, developed in tandem with the engineered design plans (Appendix B), a low flow channel would be cut between stations 18+60 and 20+50 (Figure 1). The thalweg will be lowered approximately 3 feet at station 18+60 and slightly less elsewhere, removing a total of approximately 120 cubic yards of material. After sediment has been removed, engineered streambed material will be placed, creating a defined and roughened channel bed along approximately 100 linear feet of stream channel.

Parallel Encapsulated Soil Lifts will be installed along approximately 75 linear feet of steam channel, creating a defined thalweg and increased storm flow capacity. The project has more Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 401 of 1114 ends

benefit at lower flows with less benefit at higher flows and is expected to reduce 5‐year water surfaces by 1.7 feet at Cross Section 18+60 and 10‐year water surfaces by 1.1 feet.

Implementation of the project would involve temporary dewatering of the creek channel and diversion of flows around the site, direct removal of sediment from the channel using an excavator and manual removal of riparian vegetation. Access to the work area would be through the vacant parcel at 210 Tally Ho Road. The planning and design phase is occurring between 2021 and 2023. Construction of the stream restoration is planned for September 2023 with funding from the Department of Water Resources (DWR) through the Urban Streams Restoration Program.

Figure 1. Existing conditions at Reach 3

9. Surrounding Land Uses and Setting
The City of Arroyo Grande is located in the southwestern portion of San Luis Obispo County, and the project site is located within the northeast section of the City of Arroyo Grande. The City is

5.45 square miles in size and is bounded by the Cities of Grover Beach and Pismo Beach to the southwest and west, and to the unincorporated County to the north, east and south. U.S. 101 extends northwest and southeast through the middle of the City, and Highway 227 runs east from U.S. 101 through the Village Area. Residential Rural and Suburban development characterize unincorporated areas to the north and southeast, and Agricultural uses dominate the Arroyo Grande Valley that extends northeast and south of the City.

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 402 of 1114 ends

Figure 2. Location Map
The project area is the reach of Corbett Creek from the northern City border to the village Commercial area in the center of the City at the confluence of Arroyo Grande Creek. The Corbett Creek reach is one of three (3) main tributaries within the City limits. The creek flows are generally perennial in the project reach with higher flows in the winter and very low flow in the summer. The area experiences a Mediterranean climate with most precipitation occurring Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 403 of 1114 ends

from November to March. Corbett Creek stream flows remain elevated in the spring as groundwater and subsurface flows contribute to the stream. The subwatershed is dominated by agriculture and rural residential land uses. At the project reach the channel is not formally channelized; however, encroachment activities by residents over the years have effectively channelized portions of the creek. Vegetation within the project area includes native and exotic grasses, native and exotic brush including blackberry and Willow trees, and ornamental landscaping on the residential properties.

10. Required Approvals
California Department of Fish and Wildlife
Regional Water Quality Control Board
US Fish and Wildlife Service
US Army Corps of Engineers

11. California Native American Tribal Consultation (AB 52) The 2013 MND was adopted prior to the incorporation of AB 52, which assesses a project's impacts to Tribal cultural resources, into the CEQA Guidelines checklist. In the process of developing this addendum, CSLRCD has integrated an assessment of tribal cultural resources into the review process. Pursuant to AB52, CSLRCD contacted local Native American Tribes to notify them of the project. In response to notification, several Tribal representatives responded requesting formal consultation on the project. CSLRCD initiated formal consultation on April 14th, 2023. The outcomes of that consultation are detailed below in the Potential Impacts of Revised Project section.

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 404 of 1114 ends

Potential Impacts of Revised Project
This addendum evaluates potential environmental impacts that could result from the updated project.

Appendix G of the CEQA Guidelines provides a checklist of environmental issues areas that are suggested as the issue areas that should be assessed in CEQA analyses. The 2013 MND for the approved project addressed 5 of the listed 24 environmental issue areas, including Biological resources, Cultural Resources, Air Quality, Hydrology and Water quality, and Noise. The City of Arroyo Grande determined that the approved project would not significantly impact the other issue areas, including Aesthetics, Agricultural Resources, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Land use and Planning, Mineral resources, Population and Housing, Public Services, Recreation, Transportation and Traffic, or Utilities. This addendum tiers off the 2013 MND, addresses the environmental consequences of the updated project, focusing on Air Quality, Biological Resources, Tribal Cultural Resources, Energy, Hydrology and Water Quality, and Noise, and updates the analysis for these environmental issue areas based on current conditions, as listed below.

The potential environmental impacts of the updated project are considered in comparison with the approved project, to determine whether impacts associated with the updated project are consistent with the impact analysis provided in the 2013 MND for the approved Project, and whether additional mitigation measures are required to minimize or avoid potential impacts.

Air Quality: The 2013 MND determined that emissions associated with project construction were less than significant with mitigation. The scope of the updated project has not been modified to the extent that emissions would increase. Therefore, the updated project would not result in new or substantially more severe impacts associated with construction-related emissions when compared to the analysis of the approved Project in the 2013 MND. Prescribed mitigation measures will be implemented.

Biological Resources: The 2013 MND determined that impacts to biological resources were less than significant with mitigation due to the historical land used and modification as well as prevalence of invasive species present. It is still expected that the long term benefits of restoring the floodplain and riparian habitat will outweigh short term impacts. The increased detail in the 65% engineered design plans described construction activities more acutely, including the extent of grading, fill volumes, and number of trees removed. This increased detail indicates that the updated project will not result in new or substantially more impacts to sensitive species and habitats. Prescribed mitigation measures will be implemented, and additional opportunities for on-site habitat enhancement will be explored.

Tribal and Cultural Resources: As described above, additional Tribal Cultural Resource assessment was completed in the development of this addendum to ensure the project's potential impacts to Tribal resources was thoroughly assessed. Local Tribes were provided with a project description of Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 405 of 1114 ends

ground disturbing activities, engineered design plans, and a list of the avoidance and mitigation measures incorporated into the 2013 MND for the protection of archaeological resources. During formal the consultation process the following terms and conditions were agreed to:
- An approved archaeologist will conduct a California Historic Records Search for the project area and provide a memo report presenting their assessment of potential project impacts and recommendations for additional measures to protect Tribal resources - A pedestrian survey of the project area will be conducted by an approved archaeologist and Tribal representative prior to initiating any project activities. - A Tribal monitor or approved archaeologist may choose to be present during ground disturbing activities to monitor for the presence of Tribal resources. - All previously adopted measures for the protection of cultural resources will be implemented.

With the inclusion of these additional measures, the updated project will not result in new or substantially more impacts to Tribal and Cultural Resources when compared to the analysis of the approved Project in the 2013 MND.

Energy: Energy as a resource issue was not analyzed in the 2013 MND. The project occupies a relatively small footprint, utilizing an adjacent staging area and access route. Gas-powered equipment will be used to execute the construction activities, and language will be included in contracts that equipment must be maintained in good working order. Renewable energy will be utilized as available for equipment. Due to the small footprint of the project and short construction timeline, and requirements for equipment functionality, the updated project will not result in potentially significant environmental impact or conflict with or obstruct a state or local plan for renewable energy or energy efficiency when compared to the analysis of the approved Project in the 2013 MND.

Hydrology/Water Quality: The 2013 MND determined that project activities, including grading and filling, could degrade or violate water quality and waste discharge requirements, or alter existing drainage patterns resulting in erosion or flooding. Analysis also determined that the project had the potential to impede or redirect flood flows within a 100-year flood hazard area and expose people or structures to a significant risk of loss, injury, or death from flooding. The increased detail in the 2022 65% engineered design plans describe construction activities more specifically, including the extent of grading, fill volumes, and number of trees removed. Additionally, project proponents have incorporated regulatory responses on required and recommended measures and modifications to ensure the project activities are protective of water quality and will not increase flood elevations.

Approvals and permits include 401 Water Quality Certification for Small Habitat Restoration Projects from the State Water Resources Control Board and a Flood Hazard Review from the City of Arroyo Grande. Additional modeling of flood elevations via HEC-RAS modeling, indicating increased channel capacity for storm flows and increased surface water elevations has been completed and is incorporated in the 65% design plans and Tally Ho Technical Memo. Therefore, the updated project would not result in new or substantially more severe impacts associated with water quality or Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 406 of 1114 ends
Page 407 of 1114 ends

References
Arroyo Grande Creek Erosion, Sedimentation and Flooding Alternatives Study, Swanson Hydrology & Geomorphology, January 4, 2006
Tally Ho Tech Memo, Waterways Consulting, Inc, 2012
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 408 of 1114 ends

Appendix A: 50% designs for Sediment Basin
and Wetland Creation Project
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 409 of 1114 ends

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project 17

Page 410 of 1114 ends

Appendix B: 65% designs for Stream Channel
Restoration
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 411 of 1114 ends
Page 412 of 1114 ends
Page 413 of 1114 ends
Page 414 of 1114 ends
Page 415 of 1114 ends
Page 416 of 1114 ends
Page 417 of 1114 ends

Corbett Creek Floodplain and Stream Restoration
Project
Addendum to the
2013 Initial Study / Mitigated Negative Declaration
SCH# 2013031045
Prepared by
Coastal San Luis Resource Conservation District
1203 Main St, Ste B, Morro Bay CA, 93442
April 2023

Page 418 of 1114 ends

Table of Contents
Table of Contents 2
Introduction 2
Previous Environmental Review 4
Corbett Creek Floodplain and Stream Restoration Project 6

1. Project Title 6

2. Lead Agency Name and Address 6

3. Contact Person and Phone Number 6

4. Project Location 6

5. Project sponsor's name and address 7

6. General Plan Designation 7

7. Zoning Designation 7

8. Description of Project 7

9. Surrounding Land Uses and Setting 9

10. Required Approvals 11

11. California Native American Tribal Consultation (AB 52) 11 Potential Impacts of Revised Project 11
Determination 14
References 14
Appendix A: 50% designs for Sediment Basin and Wetland Creation Project Appendix B: 65% designs for Stream Channel Restoration
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 419 of 1114 ends

Introduction
This document is an Addendum to the 2013 Corbett Creek Floodplain and Stream Restoration Project Initial Study and Mitigated Negative Declaration (MND) prepared in compliance with the California Environmental Quality Act (CEQA) of 1970, Public Resources Code §21000, et seq., as amended, and implementing CEQA Guidelines, Title 14, Chapter 3 of the California Code of Regulations. The 2013 Corbett Creek Floodplain and Stream Restoration Project MND evaluated the acquisition of a floodplain easement on Corbett Creek as well as the restoration of approximately 900 feet of stream channel downstream of the floodplain easement.

The purpose of this Addendum is to analyze the environmental impacts of the Corbett Creek Floodplain and Stream Restoration Project, herein referred to as the “updated project.” The updated project includes more detailed engineered design plans that more accurately define project impacts. The approved project, evaluated in the 2013 MND, included 50% conceptual engineered design plans with approximate impacts. The updated project location and technical approach does not differ from the approved project. Item 7, Description of Project, of this addendum defines the revised project and describes the proposed changes in detail.

The City of Arroyo Grande assumed the role of Lead Agency for the development of the 2013 MND. Due to changes in project roles, the Coastal San Luis Resource Conservation District (CSLRCD) took over the role of Lead Agency for this project in 2023.

This Addendum has been prepared in accordance with the relevant provisions of CEQA and the CEQA Guidelines. According to Section 15164(b) of the CEQA Guidelines, an addendum to a Negative Deceleration is the appropriate environmental document in instances when “only minor technical changes or additions are necessary or none of the conditions described in Section 15261 calling for the preparation of a subsequent Negative Deceleration have occurred.” Section 15162(a) of the CEQA Guidelines states no subsequent Negative Deceleration shall be prepared for a project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following:

1. Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;

2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or Negative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 420 of 1114 ends

3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the Negative Declaration was adopted, shows any of the following:

A. The project will have one or more significant effects not discussed in the previous MND, B. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
C. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or D. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

The increased detail included in the updated project are minor in the sense they would not create potentially significant environmental impacts in addition to those already identified in the 2013 MND for the approved Corbett Creek Floodplain and Stream Restoration Project. The updated project would also not substantially increase the magnitude or severity of impacts that were previously identified. This addendum includes a description of the updated project, and a discussion of the environmental impacts of the proposed project change, focusing on Air Quality, Biological Resources, Tribal Cultural Resources, Energy, Hydrology and Water Quality, and Noise.

CSLRCD Board of Directors shall consider this addendum with the 2013 Corbett Creek Floodplain and Creek Restoration Project MND prior to making a CEQA decision on the updated project. The 2013 Corbett Creek Floodplain and Creek Restoration Project MND is available for review at the CSLRCD offices, located at 1203 Main Street, suite B, in Morro Bay, 93442.

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 421 of 1114 ends

Previous Environmental Review
This section provides an overview of the 2013 Corbett Creek Floodplain and Creek Restoration Project MND, to provide context for this addendum
2013 Corbett Creek Floodplain and Creek Restoration Project MND The 2013 Corbett Creek Floodplain and Creek Restoration Project MND evaluates the potential environmental effects of the acquisition of a 12.5-acre conservation easement, the design and construction of a sedimentation and flood reduction basin on the easement property, as well as an analysis of a proposed sediment removal and creek restoration project downstream along Corbett Creek intended to reduce flooding in that area. The project begins at the East Branch Street culvert and extends upstream approximately one (1) mile to the north end of the Clark Property (APN 007-791-032).

A conservation easement and sedimentation reduction project is being sought on the subject property as a strategic location to carry out inter-related goals of the California Department of Water Resources Flood Protection Corridor Program and the City of Arroyo Grande’s goals stated in the Conservation/Open Space and Agricultural Element of the 2001 General Plan and 2007 Creek Resources Protection Study.

The 2013 MND found that the following factors would be potentially affected by the project:

Air Quality: Analysis of project impacts determined that emissions associated with project construction could affect adjacent properties and would add to the cumulatively significant effect that results in basin-wide exceedance of air quality standards. These temporary fugitive dust and combustion emissions can impact local air quality. Adopted mitigation measures MM3.1 and MM3.2 prescribe several actions to reduce emissions to less than significant.

Biological Resources: Analysis of biological resources present in the project area determined that adverse effects on sensitive species, including California red-legged frog, and riparian habitats would be less than significant with mitigation. Adopted measures include avoiding nesting and mating seasons for present sensitive species, pre-construction surveys, and appropriate regulatory permitting.

Cultural Resources: Analysis of project impacts determined that adverse change in the significance of an archaeological resource could be less than significant with mitigation. Adopted measures include suspending work and contacting appropriate authorities if resources are encountered.

Hydrology/Water Quality: Analysis of hydrology and water resources within the project area determined that project activities, including grading and filling could degrade or violate water quality and waste discharge requirements, or alter existing drainage patterns resulting in erosion or flooding. Analysis also determined that the project had the potential to impede or redirect flood flows within a 100-year flood hazard area and expose people or structures to a significant risk of loss, Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 422 of 1114 ends

injury, or death from flooding. Potentially significant impacts on hydrology and water quality from construction related activities can be reduced to a less-than-significant level with implementation of the several mitigation measures, including adoption of a project-specific Stormwater Pollution Prevention Plan, establishment of permanent vegetation cover after project completion, installation of erosion control practices during and following construction, and compliance with any and all applicable regulation associated with floodway management.

Noise: Analysis of project impacts determined that the residents adjacent to the project area may be exposed to noise levels in excess of established standards and that the project may generate periodic or temporary increases in ambient noise levels. Noise impacts associated with short term construction are expected to be minimal, and adopted mitigation measures, including restricted work windows and engine mufflers will reduce impacts to less than significant.

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 423 of 1114 ends

Corbett Creek Floodplain and Stream
Restoration Project

1. Project Title
Corbett Creek Floodplain and Stream Restoration Project

2. Lead Agency Name and Address
Coastal San Luis Resource Conservation District
1203 Main St. Suite B Morro Bay, CA 93442
(805)772-4391

3. Contact Person and Phone Number
Hallie Richard, Conservation Programs Manager
805-772-4391, [email protected]

4. Project Location

1. Floodplain Easement: APN 007-791-032 (Clark Property)

2. Stream Restoration (APNs: 007-211-013, 007-211-007, 007-211-038, 007-211-030, 007-211-029, 007-252-013) See figure 1 below.

5. Project sponsor's name and address
Coastal San Luis resource Conservation District
1203 Main St, Ste B
Morro Bay, CA 93442

6. General Plan Designation

1. Low Density Residential (LD); Conservation Open Space (C/OS)

2. Low-Medium Density Residential (LM); Conservation Open Space (C/OS)

7. Zoning Designation

1. Residential Hillside (RH); Public Facility (PF) (combining designation for the portion of the property containing the creek channel)

2. Residential Suburban (RS); Single Family (SF); Village Mixed Use (VMU); Village Core Downtown (VCD); Public Facility (PF) (combining designations for portions of properties containing the creek channel)
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 424 of 1114 ends

8. Description of Project
The project scope includes the acquisition of a conservation easement and design and implementation of a sediment reduction project for the purpose of floodplain restoration, sediment capture and peak flow attenuation along specific reaches of Corbett Creek. The sediment reduction project includes two distinct components:

1. CSLRCD has acquired a conservation easement in perpetuity over 12.50 acres of the 15.79 acre Clark Property at the confluence of Carpenter Creek and Corbett Creek to act as a floodplain and thereby attenuate peak flows. The conservation easement area will be used to construct a sediment basin, a floodwater detention area and a riparian habitat enhancement area (Appendix A). These easement acquisition and construction components of the project are identified in a technical study (Swanson Hydrology and Geomorphology, 2006) as critical to alleviating flooding on Corbett Creek and reducing stress on lower Arroyo Grande Creek through the reduction of peak flows and fine sediment. These project components have also been identified as providing an important location upon which to restore riparian and floodplain habitat within an urban wildlife corridor. Final engineering design, permitting, implementation and monitoring are anticipated to be completed using grant funds obtained from the Department of Water Resources (DWR) through the Urban Streams Restoration Program or State Coastal Conservancy. Secured funding is contingent upon commitment from project beneficiaries (City of Arroyo Grande, SLO Co Flood Control Zones 3 and 1/1A) for long-term maintenance of the sediment basins. The estimated sediment delivery reduction provided by the site is approximately nine hundred (900) tons per year. Specific elements of the project include the following: (1) Conservation easement acquisition. (2) Sedimentation reduction through construction of active and passive sedimentation basins. (3) Long-term and regular maintenance of basins and removal of accumulated sediments.

2. Planning, design and implementation of a channel restoration project to re-establish the channel geometry of approximately two-hundred seventy feet (270’) of Corbett Creek (aka Tally Ho Creek) (Reach 3), thereby increasing flow volumes and reducing storm flow water surfaces. Beginning at the 4’ headcut at station 18+60, a rock weir will be installed, armoring the headcut and lessening the steep grade. Following upstream from the rock weir, a low flow channel would be excavated through sediment that has built up over the years along Reach 3. According to the Tally Ho Tech Memo, developed in tandem with the engineered design plans (Appendix B), a low flow channel would be cut between stations 18+60 and 20+50 (Figure 1). The thalweg will be lowered approximately 3 feet at station 18+60 and slightly less elsewhere, removing a total of approximately 120 cubic yards of material. After sediment has been removed, engineered streambed material will be placed, creating a defined and roughened channel bed along approximately 100 linear feet of stream channel.

Parallel Encapsulated Soil Lifts will be installed along approximately 75 linear feet of steam channel, creating a defined thalweg and increased storm flow capacity. The project has more Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 425 of 1114 ends

benefit at lower flows with less benefit at higher flows and is expected to reduce 5‐year water surfaces by 1.7 feet at Cross Section 18+60 and 10‐year water surfaces by 1.1 feet.

Implementation of the project would involve temporary dewatering of the creek channel and diversion of flows around the site, direct removal of sediment from the channel using an excavator and manual removal of riparian vegetation. Access to the work area would be through the vacant parcel at 210 Tally Ho Road. The planning and design phase is occurring between 2021 and 2023. Construction of the stream restoration is planned for September 2023 with funding from the Department of Water Resources (DWR) through the Urban Streams Restoration Program.

Figure 1. Existing conditions at Reach 3

9. Surrounding Land Uses and Setting
The City of Arroyo Grande is located in the southwestern portion of San Luis Obispo County, and the project site is located within the northeast section of the City of Arroyo Grande. The City is

5.45 square miles in size and is bounded by the Cities of Grover Beach and Pismo Beach to the southwest and west, and to the unincorporated County to the north, east and south. U.S. 101 extends northwest and southeast through the middle of the City, and Highway 227 runs east from U.S. 101 through the Village Area. Residential Rural and Suburban development characterize unincorporated areas to the north and southeast, and Agricultural uses dominate the Arroyo Grande Valley that extends northeast and south of the City.

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 426 of 1114 ends

Figure 2. Location Map
The project area is the reach of Corbett Creek from the northern City border to the village Commercial area in the center of the City at the confluence of Arroyo Grande Creek. The Corbett Creek reach is one of three (3) main tributaries within the City limits. The creek flows are generally perennial in the project reach with higher flows in the winter and very low flow in the summer. The area experiences a Mediterranean climate with most precipitation occurring Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 427 of 1114 ends

from November to March. Corbett Creek stream flows remain elevated in the spring as groundwater and subsurface flows contribute to the stream. The subwatershed is dominated by agriculture and rural residential land uses. At the project reach the channel is not formally channelized; however, encroachment activities by residents over the years have effectively channelized portions of the creek. Vegetation within the project area includes native and exotic grasses, native and exotic brush including blackberry and Willow trees, and ornamental landscaping on the residential properties.

10. Required Approvals
California Department of Fish and Wildlife
Regional Water Quality Control Board
US Fish and Wildlife Service
US Army Corps of Engineers

11. California Native American Tribal Consultation (AB 52) The 2013 MND was adopted prior to the incorporation of AB 52, which assesses a project's impacts to Tribal cultural resources, into the CEQA Guidelines checklist. In the process of developing this addendum, CSLRCD has integrated an assessment of tribal cultural resources into the review process. Pursuant to AB52, CSLRCD contacted local Native American Tribes to notify them of the project. In response to notification, several Tribal representatives responded requesting formal consultation on the project. CSLRCD initiated formal consultation on April 14th, 2023. The outcomes of that consultation are detailed below in the Potential Impacts of Revised Project section.

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 428 of 1114 ends

Potential Impacts of Revised Project
This addendum evaluates potential environmental impacts that could result from the updated project.

Appendix G of the CEQA Guidelines provides a checklist of environmental issues areas that are suggested as the issue areas that should be assessed in CEQA analyses. The 2013 MND for the approved project addressed 5 of the listed 24 environmental issue areas, including Biological resources, Cultural Resources, Air Quality, Hydrology and Water quality, and Noise. The City of Arroyo Grande determined that the approved project would not significantly impact the other issue areas, including Aesthetics, Agricultural Resources, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Land use and Planning, Mineral resources, Population and Housing, Public Services, Recreation, Transportation and Traffic, or Utilities. This addendum tiers off the 2013 MND, addresses the environmental consequences of the updated project, focusing on Air Quality, Biological Resources, Tribal Cultural Resources, Energy, Hydrology and Water Quality, and Noise, and updates the analysis for these environmental issue areas based on current conditions, as listed below.

The potential environmental impacts of the updated project are considered in comparison with the approved project, to determine whether impacts associated with the updated project are consistent with the impact analysis provided in the 2013 MND for the approved Project, and whether additional mitigation measures are required to minimize or avoid potential impacts.

Air Quality: The 2013 MND determined that emissions associated with project construction were less than significant with mitigation. The scope of the updated project has not been modified to the extent that emissions would increase. Therefore, the updated project would not result in new or substantially more severe impacts associated with construction-related emissions when compared to the analysis of the approved Project in the 2013 MND. Prescribed mitigation measures will be implemented.

Biological Resources: The 2013 MND determined that impacts to biological resources were less than significant with mitigation due to the historical land used and modification as well as prevalence of invasive species present. It is still expected that the long term benefits of restoring the floodplain and riparian habitat will outweigh short term impacts. The increased detail in the 65% engineered design plans described construction activities more acutely, including the extent of grading, fill volumes, and number of trees removed. This increased detail indicates that the updated project will not result in new or substantially more impacts to sensitive species and habitats. Prescribed mitigation measures will be implemented, and additional opportunities for on-site habitat enhancement will be explored.

Tribal and Cultural Resources: As described above, additional Tribal Cultural Resource assessment was completed in the development of this addendum to ensure the project's potential impacts to Tribal resources was thoroughly assessed. Local Tribes were provided with a project description of Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 429 of 1114 ends

ground disturbing activities, engineered design plans, and a list of the avoidance and mitigation measures incorporated into the 2013 MND for the protection of archaeological resources. During formal the consultation process the following terms and conditions were agreed to:
- An approved archaeologist will conduct a California Historic Records Search for the project area and provide a memo report presenting their assessment of potential project impacts and recommendations for additional measures to protect Tribal resources - A pedestrian survey of the project area will be conducted by an approved archaeologist and Tribal representative prior to initiating any project activities. - A Tribal monitor or approved archaeologist may choose to be present during ground disturbing activities to monitor for the presence of Tribal resources. - All previously adopted measures for the protection of cultural resources will be implemented.

With the inclusion of these additional measures, the updated project will not result in new or substantially more impacts to Tribal and Cultural Resources when compared to the analysis of the approved Project in the 2013 MND.

Energy: Energy as a resource issue was not analyzed in the 2013 MND. The project occupies a relatively small footprint, utilizing an adjacent staging area and access route. Gas-powered equipment will be used to execute the construction activities, and language will be included in contracts that equipment must be maintained in good working order. Renewable energy will be utilized as available for equipment. Due to the small footprint of the project and short construction timeline, and requirements for equipment functionality, the updated project will not result in potentially significant environmental impact or conflict with or obstruct a state or local plan for renewable energy or energy efficiency when compared to the analysis of the approved Project in the 2013 MND.

Hydrology/Water Quality: The 2013 MND determined that project activities, including grading and filling, could degrade or violate water quality and waste discharge requirements, or alter existing drainage patterns resulting in erosion or flooding. Analysis also determined that the project had the potential to impede or redirect flood flows within a 100-year flood hazard area and expose people or structures to a significant risk of loss, injury, or death from flooding. The increased detail in the 2022 65% engineered design plans describe construction activities more specifically, including the extent of grading, fill volumes, and number of trees removed. Additionally, project proponents have incorporated regulatory responses on required and recommended measures and modifications to ensure the project activities are protective of water quality and will not increase flood elevations.

Approvals and permits include 401 Water Quality Certification for Small Habitat Restoration Projects from the State Water Resources Control Board and a Flood Hazard Review from the City of Arroyo Grande. Additional modeling of flood elevations via HEC-RAS modeling, indicating increased channel capacity for storm flows and increased surface water elevations has been completed and is incorporated in the 65% design plans and Tally Ho Technical Memo. Therefore, the updated project would not result in new or substantially more severe impacts associated with water quality or Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 430 of 1114 ends
Page 431 of 1114 ends

References
Arroyo Grande Creek Erosion, Sedimentation and Flooding Alternatives Study, Swanson Hydrology & Geomorphology, January 4, 2006
Tally Ho Tech Memo, Waterways Consulting, Inc, 2012
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 432 of 1114 ends

Appendix A: 50% designs for Sediment Basin
and Wetland Creation Project
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 433 of 1114 ends

Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project 17

Page 434 of 1114 ends

Appendix B: 65% designs for Stream Channel
Restoration
Addendum to the MND
Corbett Creek Floodplain and Stream Restoration Project

Page 435 of 1114 ends
Page 436 of 1114 ends
Page 437 of 1114 ends
Page 438 of 1114 ends
Page 439 of 1114 ends
Page 440 of 1114 ends
Page 441 of 1114 ends

MEMORANDUM OF UNDERSTANDING

BY AND BETWEEN THE COASTAL SAN LUIS RESOURCE CONSERVATION DISTRICT

AND THE CITY OF ARROYO GRANDE REGARDING THE CORBETT CREEK

FLOODPLAIN AND STREAM RESTORATION PROJECT
This Memorandum of Understanding ("MOU") is entered into by and between the Coastal San Luis Resource Conservation District ("RCD"), a special district of the State of California and the City of Arroyo Grande ("CITY"), a California municipal corporation, (collectively the "Parties") with reference to the following Recitals:

RECITALS
A. In 2007, CITY received a civil liability complaint from the California Regional Water Quality Control Board relating to a sewage spill that occurred in or near Arroyo Grande Creek. The CITY was required to make restitution by expending $60,000 on supplemental environmental projects (SEP) within the CITY.

B. In response to the civil liability complaint, the CITY funded two separate SEPs: (a) an SEP to retrofit the City Hall parking lot to include a landscaped bioswale and drainage filtration (approximately $41,000) and (b) an SEP to combat increased runoff and sedimentation in Corbett Canyon Creek (approximately $19,000).

C. The CITY subsequently expended an additional $42,000 (over and above the restitution obligation) to perform a preliminary field survey, biological surveys and design for an expanded Corbett Canyon Creek project ("Corbett Creek Floodplain and Stream Restoration Project" or "Project").

D. Recently, the CITY participated with the RCD in a grant application to the Department of Water Resources ("DWR") for the Urban Streams Restoration Program, which would provide funds for implementation of the Corbett Creek Floodplain and Stream Restoration Project.

E. The CITY has agreed to provide $70,000 cash and $14,000 of in-kind staff time toward the Project.

F. The DWR recently conditionally awarded a grant to the RCD in an amount not to exceed $831,420 to fund the Corbett Creek Floodplain and Stream Restoration Project. The grant is conditioned on, among other things, the DWR and RCD entering into a grant agreement. The DWR and RCD are in the process of finalizing that certain Grant Agreement No. 4600009865.

The Grant Agreement identifies the RCD as the project sponsor and the CITY as a program partner. Other programs partners are creek-side landowners, Central Coast Salmon Enhancement, the State Coastal Conservancy and the Natural Resource Conservation Service.

G. As the Grant Agreement only generally sets forth the respective obligations of the RCD and CITY, the purpose of this MOU is to more clearly defme the tasks and roles of each Party as to the other consistent with the Grant Agreement.

Page 1 of 5 ends

ATTACHMENT 2

Page 442 of 1114 ends

H. The Parties agree that performance of the Corbett Creek Floodplain and Stream Restoration Project in the City of Arroyo Grande provides a public benefit. Specifically, implementation of the Proj ect will alleviate flooding on Corbett Canyon Creek and reduce stress on the lower portion of Arroyo Grande Creek. The Project will also restore riparian and floodplain habitat.

NOW, THEREFORE, the Parties agree as follows:

1. CITY Contribution:

CITY agrees to provide $70,000 cash and $14,000 of in-kind stafftime toward the Corbett Creek Floodplain and Stream Restoration Project in the manner set forth in this MOU.

2. Project Administration:

RCD will perform all Project administration such as invoicing, expense and travel reporting, tracking overhead, quarterly and final progress reports throughout the grant contract. RCD's obligation shall specifically include grant management to revise the scope of work as needed and administration of additional contractual documents, including contracts with the DWR and subcontractors.

3. Easement Acquisition for Clark Property:
a) RCD will use its best efforts to obtain a conservation/flood easement for the approximately 12.5 acres of property specifically identified in the Grant Agreement as the Clark Property ("Conservation Easement Property"), with stream access restored to 10 acres of historic floodplain to attenuate peak storm flows and thereby increase flood protection to urban and agricultural areas downstream ("Conservation Easement"). b) CITY will reimburse RCD, in an amount not to exceed $12,000, for the costs RCD incurs in obtaining an appraisal, purchasing title reports and preparing, processing and recording the Conservation Easement in accordance with the requirements set forth in the Grant Agreement.
c) CITY will provide in-kind staff time to work with RCD to develop a Maintenance Trust to manage the removal of increased sediment within the Conservation Easement Property and other maintenance tasks associated with the Conservation Easement.

4. Design Floodplain/Sediment Detention and Long-term Management Plan:
a) CITY will provide in-kind staff time to attend two (2) meetings to review the engineering designs with necessary permitting agencies and partners and receive comment. b) CITY will work with RCD to develop a long-term management plan to support periodic sediment removal in order to maintain the Project's usefulness for sediment capture and revegetation of grassland areas.

Page 443 of 1114 ends

5. Design Stream Restoration Plan:
a) CITY will provide funds necessary, not to exceed $25,000, to RCD for the preparation of 50% design plans for a channel restoration project along 4,200 feet of stream (immediately downstream of the Conservation Easement Property) to restore the channel geometry, thereby increasing flow volumes. CITY engineering staff will attend two (2) meetings to review the designs with necessary permitting agencies and partners and receive comment.
b) RCD will coordinate access agreements and outreach to multiple landowners on the Project trajectory.

6. Permitting and Environmental Compliance:
a) Permitting for Floodplain/Sediment Detention Basin.
(1) CITY will provide staff time necessary, not to exceed a $7,000 value, to review permit applications and prepare California Environmental Quality Act ("CEQA") documents. Permits include those required by the Department of Fish and Game, Regional Water Quality Control Board, U.S. Army of Corps of Engineers, and the CITY. The CITY will prepare a Negative Declaration or a Mitigated Negative Declaration based on the existing initial study and 100% designs of the floodplain project.
b) Permitting for Stream Restoration.
(1) CITY will provide the staff time necessary, not to exceed a $7,000 value, to prepare an initial study to determine what CEQA documents may be required for the stream restoration project.
(2) CITY will provide up to $33,000 in cash to cover the costs to write and submit permits and environmental compliance documents beyond the initial study subject to the option set forth below. RCD will complete permit applications and lead the permit conversations with the various responsible agencies. RCD will complete the CEQA documents after the initial study is performed. The CITY may, at its option, decide to prepare the needed CEQA documents as an in-kind match and advise RCD in writing ifit intends to do so.

7. General Provisions of this MOD:
a) The Parties recognize that grant disbursement is subject to fund availability and potential withholding by the State. In the event that the grant is not disbursed, the Parties are excused from the performance of this MOU except as set forth herein. b) CITY agrees to provide any information necessary for RCD to establish compliance with the terms set forth in the Grant Agreement.

Page 3 ends

c) CITY agrees to perform all work set forth in this MOU in accordance with the requirements and standards set forth in the Grant Agreement and applicable provisions of the law.
d) All coordination, assistance, and services rendered under this MOU will be carried out in compliance with the objectives, roles and responsibilities of the Parties. e) The Parties will exchange information and consult with each other before implementing the provisions hereof that may affect the ability of the other party to perform under this MOU.
f) The Parties acknowledge that this MOU must be implemented through a complex series of steps that include several governmental approvals requiring compliance with the CEQA. Notwithstanding the obligations of CITY set forth in Paragraph 6 above, RCD shall be identified as the Lead Agency with respect to CEQA for all environmental issues related to all actions described in this MOU.

8. Roles and Responsibilities:

The Parties shall each designate in wntmg a single point of contact to ensure their respective responsibilities are satisfied. All future correspondence regarding this MOU and the rights and responsibilities hereunder shall be directed to the designated single points of contact.

9. Effective Date, Termination and Modification:

This MOU will become effective when executed by the Parties. This MOU may terminate by the mutual written consent of the Parties or by operation of law. This MOU may be amended by written instrument executed by the Parties.

10. Mutual Indemnification:

Each party shall, to the fullest extent permitted by law, indemnify, defend and hold the other party harmless against any and all costs, expenses, losses, claims, suits, damages, and liabilities (including reasonable attorney's fees) for acts or omissions arising out of or in connection with their respective acts or omissions performed under this MOU. 111111111111/NOTffiNGFURTHER BEYOND THIS POINT EXCEPT SIGNATURESIIIIIIIIIII

Page 4 of 5 ends

IN WITNESS WHEREOF, the parties hereto have executed this MOU effective upon the date of last signature below.

COASTAL SAN LUIS RESOURCE
CONSERVATION DISTRICT:

By:~JH~
Neil Havlik, President
CITY OF ARROYO GRANDE:

BY'ionYl~/
Date: 1/- L /-/2- Date: //-{3-lrh
ATTEST:
-
~ 'e-st-&..-- 2-: A-tA~

APPROVED AS TO FORM AND
LEGAL EFFECT: APPROVED AS TO FORM:
~~~orney
Date: ,11 J J 311~
Erica A. Stuckey, Deputy County Counsel
Date:
----------------------
APPROVED AS TO CONTENT:

Stg~Manager

Page 446 of 1114 ends

RESOLUTION NO. 23-2383

A RESOLUTION OF THE PLANNING COMMISSION OF THE

CITY OF ARROYO GRANDE APPROVING CONDITIONAL
USE PERMIT 23-001 AND CERTIFYING AN ADDENDUM TO

A PREVIOUSLY CERTIFIED MITIGATED NEGATIVE
DECLARATION; LOCATION – AN APPROXIMATELY ONEMILE STRETCH OF CORBETT CREEK BETWEEN EAST BRANCH STREET AND 379 CORBETT CANYON ROAD;
APPLICANT – HALLIE RICHARDS, COASTAL SAN LUIS

RESOURCE CONSERVATION DISTRICT
WHEREAS, the project site is an approximately one-mile stretch of Corbett Creek located between East Branch Street and 379 Corbett Canyon Road, and WHEREAS, the applicant has filed Conditional Use Permit 23-001 to complete a comprehensive restoration project; and
WHEREAS, the Staff Advisory Committee considered the project on September 8, 2022 and February 2, 2023 and recommended approval of the project; and WHEREAS, in accordance with the California Environmental Quality Act (CEQA) Guidelines, staff conducted an Initial Study (IS) and prepared a Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP). The IS/MND was certified by the Planning Commission on April 16, 2013. Due to the age of the environmental document, the applicant prepared an addendum to the IS/MND. The previously certified IS/MND, the MMRP and the addendum are included as Exhibits “B” and “C” and “D,” respectively, in this attached Resolution; and WHEREAS, the Planning Commission of the City of Arroyo Grande has reviewed the project at a duly noticed public hearing on June 6, 2023; and
WHEREAS, the Planning Commission finds, after due study, deliberation, and public hearing, the following circumstances exist:

Conditional Use Permit Findings:

1. The proposed use is permitted within the subject district pursuant to the provisions of this section and complies with all the applicable provisions of this title, the goals, and objectives of the Arroyo Grande General Plan, and the development policies and standards of the City.

The proposed use of the site for a restoration project is permitted with approval of a conditional use permit by the City Council after receiving a recommendation from the Planning Commission and the project complies with all applicable provisions of the Arroyo Grande General Plan and Municipal Code.

2. The proposed use would not impair the integrity and character of the district ATTACHMENT 3

Page 447 of 1114 ends

RESOLUTION NO. 23-2383
PAGE 2
in which it is to be established or located.

The proposed use of the site for a creek restoration project will not impair the integrity of the project site due to the intent of the project to return the site to its natural condition.

3. The site is suitable for the type and intensity of use or development that is proposed.

The site is an approximately one-mile stretch of Corbett Creek, which is suitable for a creek restoration project and meets the development standards of the Arroyo Grande Municipal Code.

4. There are adequate provisions for water, sanitation, and public utilities and services to ensure public health and safety.

The project involves restoring a one-mile section of creek to a natural state.

Based on the project description, no utilities will be required at the site. No aspect of the proposed project is anticipated to be overly impactful to the existing services. Conditions of approval developed for the project will additionally ensure public services are minimally impacted.

5. The proposed use will not be detrimental to the public health, safety or welfare or materially injurious to properties and improvements in the vicinity.

The proposed use will not be detrimental to the public health, safety or welfare, nor materially injurious to properties or improvements in the vicinity, as it will comply conditions of approval specifically developed for the project.

NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Arroyo Grande hereby approves Conditional Use Permit 23-001 as set forth in Exhibit “B”, attached hereto and incorporated herein by this reference, with the above findings and subject to the conditions as set forth in Exhibit "A", attached hereto and incorporated herein by this reference.

On motion by Commissioner Sackrison, seconded by Vice Chair Berlin, and by the following roll call vote, to wit:

AYES: Sackrison, Berlin, Buchanan and Maraviglia
NOES: None
ABSENT: Roof
the foregoing Resolution was adopted this 6th day of June, 2023

Page 448 of 1114 ends

RESOLUTION NO. 23-2383
PAGE 3
_______________________________

JAMIE MARAVIGLIA
CHAIR
ATTEST:
_______________________________

PATRICK HOLUB

SECRETARY TO THE COMMISSION
AS TO CONTENT:
_______________________________

BRIAN PEDROTTI

COMMUNITY DEVELOPMENT DIRECTOR

Page 449 of 1114 ends

RESOLUTION NO. 23-2383
PAGE 4
EXHIBIT ‘A’

CONDITIONS OF APPROVAL
CONDITIONAL USE PERMIT 23-001

CORBETT CREEK RESTORATION PROJECT

COMMUNITY DEVELOPMENT DEPARTMENT

PLANNING DIVISION

GENERAL CONDITIONS

1. The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project.

2. The applicant shall comply with all conditions of approval for Conditional Use Permit 23-001.

3. This application shall automatically expire on June 6, 2025 unless a Lake and Streambed Alteration permit is issued by the California Department of Fish and Wildlife (CDFW). Thirty (30) days prior to the expiration of the approval, the applicant may apply for an extension of one (1) year from the original date of expiration.

4. Development shall occur in substantial conformance with the plans presented to the Planning Commission at the meeting of June 6, 2022 and marked Exhibit B.

5. The applicant shall agree to indemnify and defend at his/her sole expense any action brought against the City, its present or former agents, officers, or employees because of the issuance of said approval, or in any way relating to the implementation thereof, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any court costs and attorney's fees which the City, its agents, officers or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his/her obligations under this condition.

6. A copy of these conditions shall be incorporated into all construction documents.

7. At the time of application for construction permits, plans submitted shall show all development consistent with the approved site plan, floor plan, architectural elevations and landscape plan.

8. All conditions of this approval run with the land and shall be strictly adhered to, within the time frames specified, and in an on-going manner for the life of the project. Failure to comply with these conditions of approval may result in an immediate enforcement action. If it is determined that violation(s) of these conditions of approval have occurred, or are occurring, this approval may be revoked pursuant to Development

Page 450 of 1114 ends

RESOLUTION NO. 23-2383
PAGE 5
Code Section 16.08.100.

GENERAL CONDITIONS

9. All project improvements shall be designed and constructed in accordance with the most recent version of the City of Arroyo Grande Standard Specifications and Engineering Standards.

10. Preserve existing survey monuments and vertical control benchmarks in compliance with Standard Specifications Section 5-1.26A.

11. The applicant shall be responsible for obtaining an encroachment permit for all work within a public right-of-way (City, County and/or Caltrans).

Page 451 of 1114 ends

EXHIBIT B

Page 452 of 1114 ends
Page 453 of 1114 ends
Page 454 of 1114 ends
Page 455 of 1114 ends
Page 456 of 1114 ends
Page 457 of 1114 ends
Page 458 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 1 of 43 ends

INITIAL STUDY/

MITIGATED NEGATIVE

DECLARATION
Map of Clark Property (APN 007-791-032)
Staff Project No. 13-001
Corbett Creek Floodplain and Stream Restoration Project March 2013

EXHIBIT C

Page 459 of 1114 ends
Page 460 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 3 of 43 ends

Table of Contents:

Introduction .................................................................................................................................................. 5 Introduction and Regulatory Guidance..................................................................................................... 5 Lead Agency .............................................................................................................................................. 5 Purpose and Document Organization ....................................................................................................... 6 Summary of Findings................................................................................................................................. 6 Project Description........................................................................................................................................ 7 Introduction .............................................................................................................................................. 7 Background and Need for Project ............................................................................................................. 9 Other Required Public Agency Approvals ...............................................................................................10 Related Projects ......................................................................................................................................10 Environmental Checklist .............................................................................................................................11 Project Information ................................................................................................................................. 11 Environmental Factors Potentially Affected ...........................................................................................13 Determination .........................................................................................................................................13 Evaluation of Environmental Impacts .....................................................................................................14 Environmental Issues ..................................................................................................................................15

1. Aesthetics ............................................................................................................................................15

2. Agriculture and Forestry Resources ....................................................................................................16

3. Air Quality ...........................................................................................................................................16

4. Biological Resources ............................................................................................................................18

5. Cultural Resources ..............................................................................................................................21

6. Geology and Soils ................................................................................................................................23

7. Greenhouse Gas Emissions .................................................................................................................25

8. Hazards and Hazardous Materials ......................................................................................................25

9. Hydrology and Water Quality .............................................................................................................26

10. Land Use and Planning ......................................................................................................................29

11. Mineral Resources ............................................................................................................................30

12. Noise .................................................................................................................................................30

13. Population and Housing ....................................................................................................................32

14. Public Services ...................................................................................................................................33

15. Recreation .........................................................................................................................................33

16. Transportation/Traffic.......................................................................................................................34

17. Utilities and Service Systems ............................................................................................................34

Page 461 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 4 of 43 ends

Mandatory Findings of Significance ............................................................................................................36 Summary of Mitigation Measures ..............................................................................................................37 References ..................................................................................................................................................43

Page 462 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 5 of 43 ends

Introduction
Introduction and Regulatory Guidance
The Initial Study/Mitigated Negative Declaration (IS/MND) has been prepared by the City of Arroyo Grande (the City) to evaluate the potential environmental effects of the proposed project. This document has been prepared in accordance with the California Environmental Quality Act (CEQA), Public Resources Code §21000 et seq., and the State CEQA Guidelines, California Code of Regulations (CCR) §15000 et seq.

An Initial Study is conducted by a lead agency to determine if a project may have a significant effect on the environment [CEQA Guidelines §15063(a)]. If there is substantial evidence that a project may have a significant effect on the environment, an Environmental Impact Report (EIR) must be prepared, in accordance with CEQA Guidelines §15064(a). However, if the lead agency determines that revisions in the project plans or proposals made by or agreed to by the applicant avoid, reduce or mitigate the potentially significant effects to a less-than-significant level, a Mitigated Negative Declaration may be prepared instead of an EIR [CEQA Guidelines §15070(b)]. The lead agency prepares a written statement describing the reasons a proposed project would not have a significant effect on the environment and, therefore, why an EIR need not be prepared. This IS/MND conforms to the content requirements under CEQA Guidelines §15071.

Trustee and Responsible Agencies
The following public agencies have legal responsibilities for carrying out or approving portions of the project. A responsible agency must actively participate in the lead agency’s CEQA process, review the lead agency’s CEQA document, and use that document when making a decision on the project. The responsible agency must rely on the lead agency’s environmental document to prepare and issue its own findings regarding the project.

California Department of Fish and Wildlife (CDFW) – Regulatory agency Regional Water Quality Control Board (RWQCB) – Regulatory agency US Fish and Wildlife Service (FWS) – Regulatory agency
US Army Corps of Engineers (USACE) – Regulatory agency
California Coastal Conservancy (CCC) – Funder, grant contractor California Department of Water Resources (DWR) – Funder, grant contractor Coastal San Luis Resource Conservation District (RCD) – Project Manager Lead Agency
The lead agency is the public agency with primary approval authority over the proposed project. In accordance with CEQA Guidelines §15051(b)(1), "the lead agency will normally be an agency with general governmental powers, such as a city or county, rather than an agency with a single or limited purpose." The lead agency for the proposed project is the City of Arroyo Grande. The contact person for the lead agency is:

Kelly Heffernon, AICP
Associate Planner
City of Arroyo Grande
Arroyo Grande, CA 93420
(805) 473-5420

Page 463 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 6 of 43 ends

Purpose and Document Organization
The purpose of this document is to evaluate the potential environmental effects of the proposed project. Mitigation measures have been identified and incorporated into the project to eliminate any potentially significant impacts or reduce them to a less-than-significant level.

This document is organized as follows:

Introduction
This chapter provides an introduction to the project and describes the purpose and organization of this document.

Project Description
This chapter describes the reasons for the project, scope of the project, and project objectives.

Environmental Setting, Potential Impacts and Mitigation Measures This chapter identifies the significance of potential environmental impacts, explains the environmental setting for each environmental issue, and evaluates the potential impacts identified in the CEQA Environmental (Initial Study) Checklist. Mitigation measures are incorporated, where appropriate, to reduce potentially significant impacts to a less-thansignificant level.

Mandatory Findings of Significance
This chapter identifies and summarizes the overall significance of any potential impacts to natural and cultural resources, cumulative impacts, and impact to humans, as identified in the Initial Study.

Summary of Mitigation Measures
This chapter summarizes the mitigation measures incorporated into the project as a result of the Initial Study.

References
This chapter identifies the references and sources used in the preparation of this IS/MND. It also provides a list of those involved in the preparation of this document.

Summary of Findings
Section 3 of this document contains the Environmental (Initial Study) Checklist that identifies the potential environmental impacts (by environmental issue) and a brief discussion of each impact resulting from implementation of the proposed project.

In accordance with §15064(f) of the CEQA Guidelines, a Mitigated Negative Declaration shall be prepared if the proposed project will not have a significant effect on the environment after the inclusion of mitigation measures in the project. Based on the available project information and the environmental analysis presented in this document, there is no substantial evidence that, after the incorporation of mitigation measures, the proposed project would have a significant effect on the environment. It is proposed that a Mitigated Negative Declaration be adopted in accordance with the CEQA Guidelines.

Page 464 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 7 of 43 ends

Project Description
Introduction
The City of Arroyo Grande (the City) has prepared this Initial Study/Mitigated Negative Declaration (IS/MND) to evaluate the potential environmental effects of the Corbett Creek Floodplain and Stream Restoration Project (the “Project”). The Project specifically involves RCD’s acquisition of a 12.5 acre conservation easement, and the design and construction of a sedimentation and flood reduction basin on the easement property. This Initial Study also includes an analysis of a proposed sediment removal and creek restoration project downstream along Corbett Creek intended to reduce flooding in that area.

Project Scope and Location
The project reach begins at the East Branch Street culvert and extends upstream approximately one (1) mile to the north end of the Clark Property (APN 007-791-032). As indicated in Exhibit A below, the focus of the Project area is identified as Reach 6. Additional environmental review will be performed for Reaches 1 through 5 once a scope of work is better defined. This IS/MND addresses impacts for Reaches 1 through 5 where they are foreseeable.

Page 465 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 8 of 43 ends

Exhibit A

Page 466 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 9 of 43 ends

Background and Need for Project
A conservation easement and sedimentation reduction project is being sought on the subject property as a strategic location to carry out inter-related goals of the California Department of Water Resources Flood Protection Corridor Program and the City of Arroyo Grande’s goals stated in the Conservation/Open Space and Agricultural Element of the 2001 General Plan and 2007 Creek Resources Protection Study (see Exhibit B below for delineation of easement area).

Exhibit B
(yellow line)

Page 467 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 10 of 43 ends

The project consists of two components as follows:

1. The acquisition by RCD of a conservation easement in perpetuity over 12.50 acres of the 15.79- acre Clark Property at the confluence of Carpenter Creek and Corbett Creek to act as a floodplain and thereby attenuate peak flows. The conservation easement area will be used to construct a sediment basin, a floodwater detention area and a riparian habitat enhancement area. These easement acquisition and construction components of the project are identified in a technical study (Swanson Hydrology and Geomorphology, 2006) as critical to alleviating flooding on Corbett Creek and reducing stress on lower Arroyo Grande Creek through the reduction of peak flows and fine sediment. These project components have also been identified as providing an important location upon which to restore riparian and floodplain habitat within an urban wildlife corridor. Most of the engineering design, permitting, implementation and monitoring will be completed using grant funds obtained from the Department of Water Resources (DWR) through the Urban Streams Restoration Program. The estimated sediment delivery reduction provided by the site is approximately nine hundred (900) tons per year.

Specific elements of the project include the following:

Conservation easement acquisition.

Sedimentation reduction through construction of active and passive sedimentation basins.

Restoration of floodplain and riparian habitat.

2. Design and permitting for a channel restoration project to re-establish the channel geometry of approximately nine hundred feet (900’) of Corbett Creek (Reach 4) and thereby increasing flow volumes. Issues that will be considered in the design process include a four-foot (4’) high head cut that is migrating upstream, sediment from uplands and developments that are clogging stormwater ditches and Corbett Creek, the increase in wetlands and marsh plants in the creek resulting in reduced creek flow volumes, and individual landowner’s activities in the floodplain that cause or encourage erosion. Currently there are no identified implementation funds for this component of the project.

Other Required Public Agency Approvals
California Department of Fish and Wildlife
Regional Water Quality Control Board
US Fish and Wildlife Service
US Army Corps of Engineers
Related Projects
None.

Page 468 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 11 of 43 ends

Environmental Checklist
Project Information
Project Title: Corbett Creek Floodplain and Stream Restoration Project (Staff Project No. 13-001)
Lead Agency Name & Address: City of Arroyo Grande
300 East Brach Street
Arroyo Grande, CA 93420
Contact Person & Telephone
Number:

Kelly Heffernon, Associate Planner
(805) 473-5420
Project Location: 1. APN 007-791-032 (Clark Property)

2. Corbett Creek reach (multiple properties)
Project Sponsor Name & Address: City of Arroyo Grande
300 East Brach Street
Arroyo Grande, CA 93420
General Plan Designation: 1. Low Density Residential (LD); Conservation Open Space (C/OS)

2. Low-Medium Density Residential (LM); Conservation
Open Space (C/OS)
Zoning: 1. Residential Hillside (RH); Public Facility (PF) (combining designation for the portion of the property containing the creek channel)

2. Residential Suburban (RS); Single Family (SF); Village Mixed Use (VMU); Village Core Downtown (VCD); Public Facility (PF) (combining designations for portions of properties containing the creek channel)
Description of Project: Acquisition of a conservation easement and design and implementation of a sediment reduction project for the purpose of floodplain restoration, sediment capture and peak flow attenuation along specific reaches of Corbett Creek.

Surrounding Land Uses: The Clark Property contains a barn, equestrian trails, corals and vacant open space. Properties located downstream along the creek channel are primarily developed with single family residences with some commercially developed properties existing closer to the Village Core area. Several of the properties along this stretch are vacant.

Page 469 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 12 of 43 ends

Project Setting: The City of Arroyo Grande is located in the southwestern portion of San Luis Obispo County, and the project site is located within the northeast section of the City of Arroyo Grande. The City is 5.45 square miles in size and is bounded by the Cities of Grover Beach and Pismo Beach to the southwest and west, and to the unincorporated County to the north, east and south. U.S. 101 extents northwest and southeast through the middle of the City, and Highway 227 runs east from U.S. 101 through the Village Area. Residential Rural and Suburban development characterize unincorporated areas to the north and southeast, and Agricultural uses dominate the Arroyo Grande Valley that extends northeast and south of the City. The project area is the reach of Corbett Creek from the northern City border to the village Commercial area in the center of the City at the confluence of Arroyo Grande Creek. The project area includes residential development adjacent to Corbett Creek except at the Village Core where there are four parcels zoned Village Core/Village Mixed Use upon which there is an existing unoccupied structure.

Plans have been approved to develop a grocery store.

The topography of the City ranges from moderate and steep hillsides to the north of U.S. 101 to relatively flat parcels toward the center of town, to moderate slopes further south. The project area has varying topographical gradients with an approximate 2-5% slope northeast.

Corbett Creek runs north/south to Arroyo Grande Creek. The Wilmar Avenue fault is a potentially active fault adjacent to the City, and the Pismo fault underlies portions of Arroyo Grande but is inactive and poses very low potential fault rupture hazard to the City. No known active faults underlie the project area.

The Corbett Creek reach is one of three (3) main tributaries within the City limits. The creek flows are generally perennial in the project reach with higher flows in the winter and very low flow in the summer. The area enjoys a Mediterranean climate with most precipitation occurring from November to March. Corbett Creek stream flows remain elevated in the spring as groundwater and subsurface flows contribute to the stream. The subwatershed is dominated by agriculture and rural residential land uses. At the project reach the channel is not formally channelized; however, encroachment activities by residents over the years have effectively channelized portions of the creek. Vegetation within the project area includes native and exotic grasses, native and exotic brush including blackberry and Willow trees, and ornamental landscaping on the residential properties.

Page 470 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 13 of 43 ends

Environmental Factors Potentially Affected
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact", as indicated by the checklist on the following pages:

Aesthetics Agricultural Resources Air Quality
Biological Resources Cultural Resources Geology/Soils
Greenhouse Gas Emissions Hazards & Hazardous Materials Hydrology/Water Quality Land Use/Planning Mineral Resources Noise
Population/Housing Public Services Recreation
Transportation/Traffic Utilities/Service Systems Mandatory Findings of Significance Determination
On the basis of this initial evaluation:

I find that the proposed project COULD NOT have a significant effect on the environment and a NEGATIVE DECLARATION will be prepared.

I find that, although the original scope of the proposed project COULD have had a significant effect on the environment, there WILL NOT be a significant effect because revisions/mitigations to the project have been made by or agreed to by the applicant. A MITIGATED NEGATIVE DECLARATION will be prepared.

I find that the proposed project MAY have a significant effect on the environment and an ENVIRONMENTAL IMPACT REPORT or its functional equivalent will be prepared.

I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated impact" on the environment. However, at least one impact has been adequately analyzed in an earlier document, pursuant to applicable legal standards, and has been addressed by mitigation measures based on the earlier analysis, as described in the report's attachments. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the impacts not sufficiently addressed in previous documents.

I find that, although the proposed project could have had a significant effect on the environment, because all potentially significant effects have been adequately analyzed in an earlier EIR or Negative Declaration, pursuant to applicable standards, and have been avoided or mitigated, pursuant to an earlier EIR, including revisions or mitigation measures that are imposed upon the proposed project, all impacts have been avoided or mitigated to a less-thansignificant level and no further action is required. _________________________________ ________________________________ Kelly Heffernon, AICP Date
Associate Planner

Page 471 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 14 of 43 ends

Evaluation of Environmental Impacts

1. A brief explanation is required for all answers, except "No Impact", that are adequately supported by the information sources cited. A "No Impact" answer is adequately supported if the referenced information sources show that the impact does not apply to the project being evaluated (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on general or project-specific factors (e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis).

2. All answers must consider the whole of the project-related effects, both direct and indirect, including off-site, cumulative, construction, and operational impacts.

3. Once the lead agency has determined that a particular physical impact may occur, the checklist answers must indicate whether that impact is potentially significant, less than significant with mitigation, or less than significant. "Potentially Significant Impact" is appropriate when there is sufficient evidence that a substantial or potentially substantial adverse change may occur in any of the physical conditions within the area affected by the project that cannot be mitigated below a level of significance. If there are one or more "Potentially Significant Impact" entries, an Environmental Impact Report (EIR) is required.

4. A "Mitigated Negative Declaration" (Negative Declaration: Less Than Significant with Mitigation Incorporated) applies where the incorporation of mitigation measures, prior to declaration of project approval, has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact with Mitigation." The lead agency must describe the mitigation measures and briefly explain how they reduce the effect to a less than significant level.

5. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR (including a General Plan) or Negative Declaration [CCR, Guidelines for the Implementation of CEQA, § 15063(c)(3)(D)].

References to an earlier analysis should:
a) Identify the earlier analysis and state where it is available for review. b) Indicate which effects from the environmental checklist were adequately analyzed in the earlier document, pursuant to applicable legal standards, and whether these effects were adequately addressed by mitigation measures included in that analysis. c) Describe the mitigation measures in this document that were incorporated or refined from the earlier document and indicate to what extent they address site-specific conditions for this project.

6. Lead agencies are encouraged to incorporate references to information sources for potential impacts into the checklist or appendix (e.g., general plans, zoning ordinances, biological assessments). Reference to a previously prepared or outside document should include an indication of the page or pages where the statement is substantiated.

7. A source list should be appended to this document. Sources used or individuals contacted should be listed in the source list and cited in the discussion.

8. Explanation(s) of each issue should identify:
a) the criteria or threshold, if any, used to evaluate the significance of the impact addressed by each question and
b) the mitigation measures, if any, prescribed to reduce the impact below the level of significance.

Page 472 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 15 of 43 ends

Environmental Issues

1. Aesthetics
Environmental Setting
The Clark Property is about 16 acres in size and is located adjacent to Corbett Creek, a tributary to Arroyo Grande Creek near the confluence of Carpenter and Corbett Creeks. The portion of the property to be encumbered with the proposed conservation easement consists primarily of open space, the creek and riparian corridor, and several small isolated wetlands. An outbuilding and a series of fenced pastures currently occupy most of the property, with approximately six (6) acres of land in seasonal pasture. The conservation easement will encompass a portion of the fenced pasture area, but does not include any structures. The project would utilize approximately 12.5 acres for a conservation easement for the purpose of restoring a historic floodplain. The project would create a sedimentation basin, expand a wetland area, construct an earthen berm around the detention area to impound additional runoff, and install control structures. These improvements would help to attenuate peak storm flows, thereby increasing flood protection to urban and agricultural areas downstream. The proposed project would enhance the rural setting by placing existing open space in a perpetual conservation easement and by adding riparian vegetation. There are no visual impacts anticipated.

Project improvements downstream along the Corbett Creek reach include channel restoration at strategic locations. Improvements include removing a four foot (4’) high head-cut that is migrating upstream, removal of sediment, and strategic removal of vegetation to increase conveyance capacity.

These improvements have not yet been designed, but there are no expected visual impacts associated with this component of the project.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Have a substantial adverse affect on a scenic vista? b) Substantially damage scenic resources, including,
but not limited to, trees, rock outcroppings, and
historic buildings within a state scenic highway?
c) Substantially degrade the existing visual character or quality of the site and its surroundings?
d) Create a new source of substantial light or glare
which would adversely affect day or nighttime views in
the area?
Discussion
a-d: No impacts.

Page 473 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 16 of 43 ends

2. Agriculture and Forestry Resources
Environmental Setting
The project area is not “Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency”, nor is it located near any Farmland.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
California Resources Agency, to non-agricultural use?
b) Conflict with existing zoning for agricultural use or a Williamson Act contract?
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code
section 12220)g)), timberland (as defined by Public
Resources Code section 4526), or timberland zoned
Timberland Production (as defined by Government
Code section 51104(g))?
d) Result in the loss of forest land or conversion of
forest land to non-forest use?
e) Involve other changes in the existing environment
which, due to their location or nature, could result in conversion of Farmland to non-agricultural use?
* In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997), prepared by the California Department of Conservation as an optional model for use in assessing impacts on agricultural and farmland.

Discussion
a-e: No impacts.

3. Air Quality
Environmental Setting
San Luis Obispo County is in non-attainment status for ozone (O3), respireable particulate matter (PM10) and vinyl chloride under the California Air Resource Board (CARB) standards. The County is in attainment status for all other applicable CARB standards.

Page 474 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 17 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Conflict with or obstruct implementation of the
applicable air quality plan?
b) Violate any air quality standard or contribute
substantially to an existing or projected air quality
violation?
c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state
ambient air quality standard (including releasing
emissions which exceed quantitative thresholds for
ozone precursors)?
d) Expose sensitive receptors to substantial pollutant
concentrations?
e) Create objectionable odors affecting a substantial
number of people?
Discussion
a: No impacts.
b-c: The San Luis Obispo County Air Pollution Control District (APCD) has developed the CEQA Air Quality Handbook to evaluate project specific impacts and determine if air quality mitigation measures are needed, or if potentially significant impacts could result. The City refers to this Handbook for all projects subject to CEQA. Although the construction phase of the project is below the thresholds for significance, some mitigation is recommended. Construction for this project includes grading to expand the wetland area and to create the sedimentation basin. The “operation” phase of this project would include periodic maintenance of the sedimentation basin and is considered insignificant. It is anticipated that sedimentation removal might occur every five (5) to ten (10) years, and would largely depend on the severity of storm conditions.

According to the general operational screening criteria in the APCD Handbook, the grading associated with the proposed project is not expected to generate potentially significant air quality impacts.

However, emissions associated with project construction could affect adjacent properties and would add to the cumulatively significant effect that results in basin-wide exceedance of air quality standards.

These temporary fugitive dust and combustion emissions can impact local air quality. Implementation of the following mitigation measures will reduce air quality impacts to a less than significant level:

MM 3.1: The following conditions shall be included on all project plans and adhered to for all grading-related permits:

Reduce the amount of disturbed area where possible.

Use water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increase watering frequency when wind speeds exceed 15 MPH.

Reclaimed (non-potable) water shall be used whenever possible.

All dirt stockpile areas should be sprayed daily or as needed using reclaimed (nonpotable) water when feasible.

Page 475 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 18 of 43 ends

Exposed ground areas that are planned to be reworked more than one (1) month after initial grading should be sown with a fast-germinating native grass seed and watered until vegetation is established.

All areas to be paved (i.e. access road to the sediment basin) should be completed as soon as possible.

All trucks hauling dirt, sand, soil or other loose materials are to be covered or shall maintain at least two (2) feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with CVC Section 23114.

Streets shall be swept at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed (non-potable) water should be used where feasible.

Diesel idling shall not be permitted.

Signs that specify the no idling requirement shall be posted and enforced at the construction site.

Use of alternative-fueled equipment is recommended whenever possible.

The contractor shall designate a person or persons to monitor and implement these measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity and to prevent the transport of dust off-site. The name and telephone number of such persons shall be provided to the Air Pollution Control District (APCD) prior to the start of any grading-related activities. (See MM 9.1 for erosion control measures).

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 3.2: All portable equipment (50 horsepower or greater) used during grading operations must be issued a permit by either the California Air Resources Board (CARB) or the APCD. (Contact the APCD Engineering Division at (805) 781-5912 for specific information regarding permitting requirements prior to start of the project).

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction d-e: No impacts.

4. Biological Resources
Environmental Setting
The project area includes the confluence of Corbett Creek and Carpenter Canyon Creek as well as the confluence of Corbett Creek and Arroyo Grande Creek. Corbett Creek is a perennial creek that carries flow except in drought years. The property has a long history of livestock grazing, and there has been some modification of natural hydrology by re-alignment of the creeks and construction of a berm.

To determine the extent and quality of wetland habitat on the project site, and whether portions of the project area were eligible for wetland protection and restoration through the Wetland Reserve Program

Page 476 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 19 of 43 ends

(WRP), a report was conducted by the Natural Resources Conservation Service (NRCS) in December 2006. According to the report, the Clark Property does not contain any land that would be eligible for the Wetland Reserve Program. The site contains small areas of natural wetlands in four (4) delineations and the remaining land subject to the conservation easement is considered non-wetland.

The project site contains a variety of non-native and native plant species, with willows being the dominant native tree species. The prevailing understory species present include German ivy, poison hemlock, California blackberry, hoary nettle, poison oak, and morning glories (Denise Duffy and Associates, 2003). According to the Tally Ho Creek Planning Project Technical Memo Appendices prepared by Waterways Consulting, Inc. (June 2010), there are several identified special status plant and wildlife species that are likely present, although were not observed during the site inventory. These include Hoover’s bent grass (Agrostis hooveri), black-flowered figwort (Scrophularia atrata), San Bernardino aster (Symphyotricham defoliatum), California red-legged frog (Rana aurora draytonii), Southwestern pond turtle (Actinemys marmorata pallid), and the Yellow Warbler (Dendroica petechia).

The U.S. Fish and Wildlife Service (USFWS) and California Department of Fish and Wildlife (CDFW) have regulatory responsibility for the protection of special status plant and wildlife species. “Special status” species are selected for protection because they are rare and/or subject to population and habitat declines. Special status is a general term for species that are afforded varying levels of regulatory protection.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Have a substantial adverse effect, either directly or through habitat modification, on any species identified as a sensitive, candidate, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or the
U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any riparian
habitat or other sensitive natural community identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or the
U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on federally
protected wetlands, as defined by §404 of the Clean
Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling,
hydrological interruption, or other means?
d) Interfere substantially with the movement of any
native resident or migratory fish or wildlife species or with established native resident or migratory wildlife
corridors, or impede the use of native wildlife nursery sites?
e) Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance?

Page 477 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 20 of 43 ends

f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state habitat conservation plan?
Discussion
a-d: With the mitigation measures identified below, it is not anticipated that the project will have a significant impact on biological resources due to the historic equestrian use of the site and the short duration of construction/grading activities. The site is dominated by non-native plants except for willows. The purpose of creating the sedimentation basin and enhancing the floodplain area is to first impede flooding downstream, and second to enhance the native habitat. It is expected that the long term benefits of restoring the floodplain and riparian habitat will outweigh short term impacts.

Although the project will incorporate requirements for any necessary permits from the California Department of Fish and Wildlife (CDFW) and United States Fish and Wildlife Service (USFWS), several mitigation measures are included to offset any potential short term impacts. The following measures are primarily designed to promote habitat avoidance.

MM 4.1: Construction/grading shall take place after the breeding season for the Yellow Warbler (April – July) to limit noise impacts. If construction/grading must start during this time period, surveys of nesting birds within the project vicinity shall be completed by a qualified wildlife biologist. If the surveys identify active nests of the Yellow Warbler within the project vicinity, all earthmoving activities shall cease until the chicks have fledged. The biologist shall provide the lead agency and responsible agencies with a written report of survey findings, and shall specify when the project work may safely commence.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager (in consultation with the U.S. Fish and Wildlife Service (USFWS) prior to proceeding with work) Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 4.2: A qualified wildlife biologist shall complete and submit to the lead agency and responsible agencies a pre-construction survey for California red-legged frogs and Southwestern pond turtles. The survey shall be conducted during the time period when these species are known to be active. If no individuals are found, construction may proceed. If individuals are found during the initial investigation, the biologist shall conduct clearance surveys for these species approximately one (1) week prior to construction. Individuals found within the construction area will either be relocated to similar, adjacent habitats at least fifty (50) yards outside of the project area, or held in captivity until construction is complete. The project area shall be monitored during construction and appropriate measures taken to ensure that the individuals of relocated species do not move into the construction area. The decision of whether to relocate the animals shall be made by the biologist, although all mitigation activities would have to occur within the framework of any permits issued by the USFWS and CDFG.

Page 478 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 21 of 43 ends

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager (in consultation with the U.S. Fish and Wildlife Service (USFWS) prior to proceeding with work) Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 4.3: A qualified botanist shall conduct an initial site survey to map occurrence of Hoover’s bent grass, San Bernardino aster and black-flowered figwort. If sensitive plant species are found on site and determined to be potentially impacted, the botanist shall prepare procedures that ensure no net loss of plants. These include, but are not limited to, designating avoidance areas, transplanting the plant populations to an equivalent location on site, or replaced in-kind with new plants at a ratio of two (2) plants replaced for each one (1) lost or at a ratio acceptable to the botanist. The transplanted or replaced plants shall be monitored over a five (5) year period.

Any plants lost during this time period shall be replaced. The botanist shall prepare a planting, irrigation and maintenance plan that includes these provisions. If the botanist concludes that avoidance is a viable option, locations determined to be potentially impacted will be flagged against inadvertent or unintentional damage.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager (in consultation with the U.S. Fish and Wildlife Service (USFWS) prior to proceeding with work) Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 4.4: The applicant shall acquire appropriate resource agency permits and undertake protection measures as required by those agencies.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
e-f: No impacts.

5. Cultural Resources
Environmental Setting
Creeks are a focal area of concern for the purposes of cultural resource sensitivity due to the pre-history and historical activity that occurred along and extending from creeks. The Central Coastal Information Center under contract to the State Office of Historic Preservation (OHP) helps implement the California Historical Resources Information System (CHRIS). It integrates information on new resources and known resources into CHRIS, supplies information on resources and surveys to governments and supplies lists of consultants qualified to conduct historic preservation fieldwork within the area. The California Archaeological Site Inventory is the collection of Site Records, which has been acquired and managed by the Information Centers and the OHP since 1975. According to these records, no known cultural site is located in the immediate project vicinity. Of the nineteen (19) site investigations conducted within a half mile radius of the project site, four (4) of which were on adjoining properties, there was only one (1)

Page 479 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 22 of 43 ends

site that revealed any positive results for archaeological resources, which was located about 0.4 mile south of the project site near Paulding Middle School.

By virtue of the project area including the confluence of two (2) creeks, there may be a likelihood of prehistoric or early historic occupation or use of the site even though there are no known sites in the vicinity. Additionally, the proposed project requires a limited amount of surface excavation for the purposes of collection of fine sediment and floodplain restoration.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Cause a substantial adverse change in the
significance of a historical resource, as defined in
§15064.5?
b) Cause a substantial adverse change in the
significance of an archaeological resource, pursuant to §15064.5?
c) Disturb any human remains, including those interred
outside of formal cemeteries?
Discussion
a-c: Although it is not anticipated that there are any impacts to archaeological/cultural resources, implementation of the mitigation measures below will ensure that no impacts will occur.

MM 5.1: In the event that prehistoric cultural materials or historic cultural materials are encountered, work in the immediate vicinity of the finds shall be suspended until reviewed by an archaeologist, and the City shall be notified immediately should such resources be discovered. The archaeologist shall work as quickly as possible to permit resumption of construction activities. It is preferred that location data of finds be recorded using a hand-held global positioning system (GPS) receiver.

If human remains are encountered and determined to be Native American in origin, the San Luis Obispo County coroner will notify the Native American Heritage Commission (NAHC) within 24 hours of the find. The NAHC shall identify the person or persons it believes to be the most likely descendent of the deceased Native American. The most likely descendent may make recommendations for means of treating or disposing of the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 5.2: The note below shall be placed on the grading and improvement plans for the project:
“If human remains (burials) are encountered, the County Coroner shall be contacted immediately (805-781-4513). In the event that previously unidentified potentially significant cultural resources are discovered, an archaeologist shall have the authority to

Page 480 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 23 of 43 ends

divert or temporarily halt ground disturbance operations in the area of discovery to allow evaluation of potentially significant cultural resources in consultation with Northern Chumash Tribal Council. For significant cultural resources, a Research Design and Data Recovery Program to mitigate impacts shall be prepared by the consulting archaeologist and approved by the City, then carried out using professional archaeological methods. If it can be demonstrated that a project will cause damage to a unique archaeological resource, the City may require reasonable efforts to be made to permit any or all of these resources to be preserved in place or left in an undisturbed state.” Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit

6. Geology and Soils
Environmental Setting
The site has varying topographical gradients but generally consist of a 2-5% northeasterly slope. The soils on the Corbett Creek watershed are derived from soft, highly erodible sandstones. High levels of sediment in the creek have come from several locations of erosion and flooding events. The highest profile erosion sources came from the clearing and grading of an upslope property on James Way for a housing development. In 2001, a combination of heavy rains and soils with a high to very high hazard rating for water erosion led to the sedimentation of the James Way stormwater ditch and Corbett Creek, in turn causing flooding to adjacent homes. Homes along Corbett Creek in some cases are as little as twenty feet (20’) from the creek and are not elevated. The sediment was deposited in Corbett Creek, raising the streambed. Sediment accumulation has created marsh-like wetland areas that alter the form and function of the creek, diminishing the in-stream habitat and the conveyance of water and sediment.

In addition to erosion, expansion of the urban fringe, road development and increases in impervious surfaces have resulted in changes in the timing and magnitude of peak flows in the creek. There are small berms in some localized areas along the north side of the active channel built by landowners.

Another factor affecting stream function is a four foot (4’) high head-cut in the creek (as of 2007). If the head-cut was to progress upstream 2,700 feet, approximately 7,000 cubic yards of sediment would mobilize (Swanson Hydrology & Geomorphology, 2008) and be transported downstream to Arroyo Grande Creek, impacting steelhead habitat and increasing flooding challenges in the Zone 1/1A flood control channel.

No active faulting is known to exist on or close to the subject property. The project is not within a known area containing serpentine or ultramafic rock or soils (i.e. low risk of naturally occurring asbestos).

Page 481 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 24 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving:
i) Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map, issued by the State
Geologist for the area, or based on other
substantial evidence of a known fault? (Refer to
Division of Mines and Geology Special Publication

42.)
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including
liquefaction?
iv) Landslides?
b) Result in substantial soil erosion or the loss of
topsoil?
c) Be located on a geologic unit or soil that is unstable, or that would become unstable, as a result of the
project and potentially result in on- or off-site
landslide, lateral spreading, subsidence, liquefaction, or collapse?
d) Be located on expansive soil, as defined in Table 18- 1-B of the Uniform Building Code (1994), creating
substantial risks to life or property?
e) Have soils incapable of adequately supporting the
use of septic tanks or alternative waste disposal
systems, where sewers are not available for the
disposal of waste water?
Discussion
a: No impacts.
b: The project is intended to alleviate risks from increasing head-cuts and deposition of sediment. The project does not alter geotechnical requirements or permit additional construction in geologically sensitive or hazardous areas. The project description integrates development and implementation of both short and long term Best Management Practices (BMPs) to address construction and long term maintenance of the sedimentation basins on the Clark Property, design of the head-cut remediation and BMPs for landowners on the project area.
c-e: No impacts.

Page 482 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 25 of 43 ends

7. Greenhouse Gas (GHG) Emissions
Environmental Setting
The project area includes residential development adjacent to Corbett Creek except at the Village Core where there are four parcels zoned Village Core/Village Mixed Use. The Clark Property is mostly undeveloped and contains a barn, equestrian trails and corals. Project construction is limited to creation of a sedimentation basin and expansion of the floodplain within defined areas. Short term greenhouse gas (GHG) emissions would be generated from equipment used for grading operations and are considered less than significant. There is not an operational phase to this project except for periodic (every 5-10 years) maintenance of the sedimentation basin. Therefore, GHG emissions cease once the initial construction is complete.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Generate greenhouse gas emissions, either directly
or indirectly, that may have a significant effect on the environment?
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of
greenhouse gases?
Discussion
a: The amount of GHG emissions from construction activities do not exceed the cumulative impact thresholds established by the San Luis Obispo County Air Pollution Control District (APCD). It should be noted that Mitigation Measures 3.1 and 3.2 address equipment and idling requirements that have the dual benefit of reducing GHG emissions.
b: No impacts.

8. Hazards and Hazardous Materials
Environmental Setting
There are no known hazards or hazardous materials associated with the project site.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset
and/or accident conditions involving the release of
hazardous materials, substances, or waste into the
environment?

Page 483 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 26 of 43 ends

c) Emit hazardous emissions or handle hazardous or
acutely hazardous materials, substances, or waste
within one-quarter mile of an existing or proposed
school?
d) Be located on a site which is included on a list of
hazardous materials sites, compiled pursuant to
Government Code §65962.5, and, as a result, create a
significant hazard to the public or environment?
e) Be located within an airport land use plan or, where such a plan has not been adopted, within two miles of
a public airport or public use airport? If so, would the project result in a safety hazard for people residing or working in the project area?
f) Be located in the vicinity of a private airstrip? If so, would the project result in a safety hazard for people
residing or working in the project area?
g) Impair implementation of or physically interfere
with an adopted emergency response plan or
emergency evacuation plan?
h) Expose people or structures to a significant risk of loss, injury, or death from wildland fires, including
areas where wildlands are adjacent to urbanized areas
or where residences are intermixed with wildlands?
Discussion
b: The project as proposed does not pose a significant hazard to the public or the environment.

However, in the unlikely event that there is an equipment malfunction producing an oil or gas spill, procedures shall be followed as outlined under MM 9.1 (preparation of a Storm Water Pollution Prevention Plan).
a, c- h: No impacts.

9. Hydrology and Water Quality
Environmental Setting
The project area includes the confluence of Corbett and Carpenter Canyon Creeks as well as the confluence of Corbett and Arroyo Grande Creeks. Except for drought years, Corbett Creek maintains perennial flow and meanders from the City limits near Highway 227 to Arroyo Grande Creek in the commercial core of the City’s Village area. It has an active low flow channel/bank full morphology that narrows to approximately two-four feet (2’-4’) wide near Arroyo Grande Creek. The creek travels through the backyards of residences on Tally Ho Road where there is persistent flooding. There is a four foot (4’) high head-cut in the creek that was initially observed by field crews in 2007. If the head-cut were to progress upstream 2,700 feet, approximately 7,000 cubic yards of sediment would mobilize (Swanson Hydrology & Geomorphology, 2008) and be transported downstream to Arroyo Grande Creek, impacting steelhead habitat and increasing flooding challenges in the Zone 1/1A flood control channel.

The project is intended to restore the riparian habitat and provide flood protection.

Construction/grading activities and exposed soil could cause temporary erosion; however, implementation of Best Management Practices (BMPs) that are integrated into the project description and the mitigation measures below will mitigate the impacts to less that significant.

Page 484 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 27 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Violate any water quality standards or waste
discharge requirements?
b) Substantially deplete groundwater supplies or
interfere substantially with groundwater recharge,
such that there would be a net deficit in aquifer
volume or a lowering of the local groundwater table
level (e.g., the production rate of pre-existing nearby wells would drop to a level that would not support
existing land uses or planned uses for which permits
have been granted)?
c) Substantially alter the existing drainage pattern of the site or area, including through alteration of the
course of a stream or river, in a manner which would
result in substantial on- or off-site erosion or siltation? d) Substantially alter the existing drainage pattern of the site or area, including through alteration of the
course of a stream or river, or substantially increase
the rate or amount of surface runoff in a manner
which would result in on- or off-site flooding?
e) Create or contribute runoff water which would
exceed the capacity of existing or planned stormwater
drainage systems or provide substantial additional
sources of polluted runoff?
f) Substantially degrade water quality?
g) Place housing within a 100-year flood hazard area,
as mapped on a federal Flood Hazard Boundary or
Flood Insurance Rate Map, or other flood hazard
delineation map?
h) Place structures that would impede or redirect flood flows within a 100-year flood hazard area?
i) Expose people or structures to a significant risk of loss, injury, or death from flooding, including flooding resulting from the failure of a levee or dam?
j) Result in inundation by seiche, tsunami, or mudflow? Discussion
a, c-f, h-i: Potentially significant impacts from soil erosion and an increase in sediment and turbidity to Arroyo Grande Creek could result from project grading and construction. Potentially significant impacts on hydrology and water quality from construction related activities can be reduced to a less-thansignificant level with implementation of the mitigation measures listed below.

The project site is within a floodway where waters flood onto horse pastures and therefore water quality impacts from equestrian use and manure accumulation may also be a concern. The project may bring surface water more frequently in contact with pastures and manure. However, the project would

Page 485 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 28 of 43 ends

not worsen the water quality situation since no more horses would be added to the site, and some of the area currently used for horse corrals and pasture would be allocated to floodwater detention and riparian habitat enhancement. It is unknown at this time what the water quality impacts from nitrogen or bacteria will be from the project. Water quality monitoring will be carried out as required by the Storm Water Pollution Prevention Plan. The property owner is interested in BMPs to manage manure through composting. These BMPs would reduce potential bacteria pollutant loading, and would be implemented separately from this project. The continued equestrian use is not considered a potentially significant impact.

There is a potential for berm failure that could impact downstream properties. This potential will be addressed through the design process, and applicable design standards will be used.

MM 9.1: The applicant shall prepare a Storm Water Pollution Prevention Plan (SWPPP) and Erosion Control Plan that specifies the implementation of Best Management Practices (BMPs) to avoid and minimize water quality impacts as required by the Regional Water Quality Control Board (RWQCB). At a minimum, the SWPPP and Erosion Control Plan shall include:

Designation of equipment and supply staging and storage areas at least 100 feet from the outside edge of the creek 25-foot setback area. All vehicle parking, routine equipment maintenance, fueling, minor repair, etc., and soil and material stockpile, shall be done only in the designated staging area.

Major vehicle/equipment maintenance, repair, and equipment washing shall be performed off site.

A wet and dry spill cleanup plan that specifies reporting requirements and immediate clean up to ensure no residual soil, surface water or groundwater contamination would remain after clean up.

Designating concrete mixer washout areas at least 100 feet from outside edge of the creek 25-foot setback with the use of appropriate containment or reuse practices.

A temporary and excess fill stockpile and disposal plan that ensures that no detrimental affects to receiving waters would result.

Required site preparation and erosion control BMPs for any work that may need to be completed after October 15.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 9.2: To reduce erosion hazards due to construction activities, grading shall be minimized, and project contractors shall use runoff and sediment control structures, and/or establish a permanent plant cover on side slopes following construction.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Page 486 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 29 of 43 ends

Timing: Prior to issuance of grading permit and during construction MM 9.3: Erosion control and bank stabilization measures shall be implemented for any work that requires access to the creek, subject to CDFW approval through a Streambed Alteration Permit. These measures shall be clearly indicated on the grading plan.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 9.4: All temporary fill placed during project construction shall be removed at project completion and the area restored to approximate pre-project contours and topography.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to final inspection
MM 9.5: The project is located within a regulatory floodway. The applicant shall obtain all required permits from regulatory agencies (City of Arroyo Grande, Regional Water Quality Control Board, US Army Corps of Engineers, Ca. Dept. of Fish and Wildlife, etc.) and meet any relevant FEMA requirements associated with a regulatory floodway as necessary.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
b, g, j: No impacts.

10. Land Use and Planning
Environmental Setting
Surrounding uses are identified on Page 10 of the Initial Study. The proposed project was reviewed for consistency with policy and/or regulatory documents and appropriate land use (Land Use Element, Development Code, and Zoning Map). Outside the channel of Corbett Creek, the Clark Property is zoned for low density residential development at a density of 0.67 dwelling units/acre (a total of up to ten units). This project includes a conservation easement in perpetuity for 12.5 acres leaving a potential residential density of up to two (2) dwelling units. There are several antiquated lots in the project area that have been developed over time and the built density along Corbett Creek exceeds that of the low density residential designation. City policy C/OS 2 states that the City is to “safeguard important environmental and sensitive biological resources contribution to healthy, functioning ecosystems”.

Conserving land for the purposes of localized and downstream flood protection and habitat restoration is consistent with the City’s General Plan.

Page 487 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 30 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Physically divide an established community?
b) Conflict with the applicable land use plan, policy, or regulation of any agency with jurisdiction over the
project (including, but not limited to, a general plan, specific plan, local coastal program, or zoning
ordinance) adopted for the purpose of avoiding or
mitigating an environmental effect?
c) Conflict with any applicable habitat conservation
plan or natural community conservation plan?
Discussion
a-c: No impacts.

11. Mineral Resources
Environmental Setting
The project site is not located within an area known to contain mineral resources. The site is not designated in the 2001 General Plan or identified in the Integrated Program EIR prepared for the General Plan as having locally-important mineral resources. There are no permitted mining operations located within the City limits of Arroyo Grande.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Result in the loss of availability of a known mineral resource that is or would be of value to the region and the residents of the state?
b) Result in the loss of availability of a locally
important mineral resource recovery site delineated
on a local general plan, specific plan, or other land use plan?
Discussion
a-b: No impacts.

12. Noise
Environmental Setting
The project site is primarily located within a low to medium density residential area. Existing ambient noise in the vicinity of the project is primarily generated by vehicular traffic. The Noise Element of the 2001 General Plan includes goals and implementation measures designed to reduce noise impacts on new development, and the City’s Noise Ordinance is the primary implementing tool of the Noise Element through specific noise standards.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact

Page 488 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 31 of 43 ends

a) Generate or expose people to noise levels in excess
of standards established in a local general plan or
noise ordinance, or in other applicable local, state, or federal standards?
b) Generate or expose people to excessive
groundborne vibrations or groundborne noise levels?
c) Create a substantial permanent increase in ambient
noise levels in the vicinity of the project (above levels without the project)?
d) Create a substantial temporary or periodic increase
in ambient noise levels in the vicinity of the project, in excess of noise levels existing without the project?
e) Be located within an airport land use plan or, where such a plan has not been adopted, within two miles of
a public airport or public use airport? If so, would the project expose people residing or working in the
project area to excessive noise levels?
f) Be in the vicinity of a private airstrip? If so, would the project expose people residing or working in the
project area to excessive noise levels?
Discussion
a, d: Noise impacts associated with short term construction are expected to be minimal due to the need for limited surface excavation. Existing ambient noise in the vicinity of the project site is generated by vehicular traffic on Highway 227. The average sound levels during construction could exceed the threshold criteria when equipment is operating. This is considered a potentially significant impact that can be mitigated to a less-than-significant level with implementation of the below mitigation measures. There are no longterm or operational increases to ambient noise levels.

MM 12.1: Construction activities shall be restricted to the hours of 8:00 AM to 5:00 PM Monday through Friday. On-site equipment maintenance and servicing shall be confined to the same hours.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 12.2: All construction equipment utilizing internal combustion engines shall be required to have mufflers that are in good condition. Stationary noise sources shall utilize noise reducing engine housing enclosures or noise screens.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction

Page 489 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 32 of 43 ends

MM 12.3: A note shall be placed on the construction plans that no more than two (2) pieces of major earth moving equipment shall be allowed to operate simultaneously.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 12.4: All residential units located within five hundred feet (500’) of the construction site shall be sent a notice regarding the construction schedule of the project. A clearly legible sign shall also be posted at the project site. All notices and the signs shall indicate the expected dates and duration of construction activities, as well as provide a telephone number that residents can call to resolve any concerns about construction noise.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction b-c, e-f: No impacts.

13. Population and Housing
Environmental Setting
The project site is located within an established low and medium density residential area. Placing 12.5 acres of the roughly 16-acre Clark Property into a conservation easement would appear to reduce the residential development potential. However, because the 12.5-acre property is located within a floodplain area, it is unlikely that housing opportunities are lost. With 3.5 acres remaining of the 16 acre site, two (2) homes could be constructed at a density of 0.67 dwelling units per acre under the Residential Hillside (RH) zoning district. Downstream along the Corbett Creel reach, the only properties with development potential (i.e. vacant) are zoned Village Mixed Use (VMU) and Village Core (VC).

These zoning designations allow commercial and residential development. The proposed project would not impede development of these properties.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Induce substantial population growth in an area,
either directly (for example, by proposing new homes
and businesses) or indirectly (for example, through
extension of roads or other infrastructure)?
b) Displace substantial numbers of existing housing,
necessitating the construction of replacement housing
elsewhere?
c) Displace substantial numbers of people,
necessitating the construction of replacement housing
elsewhere?

Page 490 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 33 of 43 ends

Discussion
a-c: No impacts.

14. Public Services
Environmental Setting
Public services to the project site are readily provided by the City of Arroyo Grande.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Result in significant environmental impacts from
construction associated with the provision of new or
physically altered governmental facilities, or the need for new or physically altered governmental facilities, to maintain acceptable service ratios, response times, or
other performance objectives for any of the public
services:

Fire protection?
Police protection?
Schools?
Parks?
Other public facilities?
Discussion
a: No impacts.

15. Recreation
Environmental Setting
The project site is a private facility with recreational uses and is not a public facility. The property owner utilizes the site primarily for corralling and grazing horses, with most of the site left in vacant open space. The project will not affect any existing private or public parks within the area, either by creating more demand for parks or diminishing the use of parks.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Increase the use of existing neighborhood and
regional parks or other recreational facilities, such that substantial physical deterioration of the facility would occur or be accelerated?
b) Include recreational facilities or require the
construction or expansion of recreational facilities that might have an adverse physical effect on the
environment?

Page 491 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 34 of 43 ends

Discussion
a: No impacts.
b: The site will continue to serve as an equestrian recreational use. The existing facilities will remain, with some reduction in corral and grazing areas (see Exhibit B above under Background and Need for Project).

16. Transportation/Traffic
Environmental Setting
The project site is located within an established low and medium density residential area with access from Highway 227/Carpenter Canyon Road, Corbett Canyon Road, and Tally Ho Road where street parking is available and level of service is acceptable (LOS C or better). The project does not generate any trips that would impact the surrounding street network LOS or the backbone circulation system of the City.

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Cause a substantial increase in traffic, in relation to existing traffic and the capacity of the street system
(i.e., a substantial increase in either the number of
vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)?
b) Exceed, individually or cumulatively, the level of
service standards established by the county congestion
management agency for designated roads or
highways?
c) Cause a change in air traffic patterns, including
either an increase in traffic levels or a change in
location, that results in substantial safety risks?
d) Contain a design feature (e.g., sharp curves or a
dangerous intersection) or incompatible uses (e.g.,
farm equipment) that would substantially increase
hazards?
e) Result in inadequate emergency access?
f) Result in inadequate parking capacity?
g) Conflict with adopted policies, plans, or programs
supporting alternative transportation (e.g., bus
turnouts, bicycle racks)?
Discussion
a-g: No impacts.

17. Utilities and Service Systems
Environmental Setting
The project site is located within the incorporated City Limits of Arroyo Grande. Utilities are available from both the City and other regional entities.

Page 492 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 35 of 43 ends

Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Exceed wastewater treatment restrictions or
standards of the applicable Regional Water Quality
Control Board?
b) Require or result in the construction of new water
or wastewater treatment facilities or expansion of
existing facilities?
Would the construction of these facilities cause
significant environmental effects?
c) Require or result in the construction of new storm
water drainage facilities or expansion of existing
facilities?
d) Have sufficient water supplies available to serve the project from existing entitlements and resources or
are new or expanded entitlements needed?
e) Result in a determination, by the wastewater
treatment provider that serves or may serve the
project, that it has adequate capacity to service the
project’s anticipated demand, in addition to the
provider’s existing commitments?
f) Be served by a landfill with sufficient permitted
capacity to accommodate the project’s solid waste
disposal needs?
g) Comply with federal, state, and local statutes and
regulations as they relate to solid waste?
Discussion
a-g: No impacts.

Page 493 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 36 of 43 ends

Mandatory Findings of Significance
Would the project:

Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Less Than
Significant
Impact
No Impact
a) Substantially degrade the quality of the
environment, substantially reduce the habitat of a fish or wildlife species; cause a fish or wildlife population to drop below self-sustaining levels; threaten to
eliminate a plant or animal community; substantially
reduce the number or restrict the range of an
endangered, rare or threatened species; or eliminate
examples of the major periods of California history or
prehistory?
b) Have the potential to achieve short-term
environmental goals to the disadvantage of long-term
environmental goals?
c) Have possible environmental effects that are
individually limited but cumulatively considerable?
“Cumulatively considerable” means that the
incremental effects of an individual project are
significant when viewed in connection with the effects
of past projects, the effects of other current projects, and the effects of possible future projects.
d) Cause substantial adverse effects on human beings,
either directly or indirectly?
Discussion
a, c-d: The project is located within an established low and medium density residential area. The purpose of the project is to reduce flooding downstream and will enhance a wetland habitat area.

Isolated prehistoric materials may be present on the project site; however, the site does not serve as an example of a major period of California history or prehistory. The project will not cumulatively increase traffic or the demand for public services and utilities. With implementation of the proposed mitigation measures, the project will not cause substantial adverse effects on human beings or special status plant or animal species, either directly or indirectly.
b: No impacts.

Page 494 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 37 of 43 ends

Summary of Mitigation Measures
MM 3.1: The following conditions shall be included on all project plans and adhered to for all grading-related permits:

Reduce the amount of disturbed area where possible.

Use water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increase watering frequency when wind speeds exceed 15 MPH.

Reclaimed (non-potable) water shall be used whenever possible.

All dirt stockpile areas should be sprayed daily or as needed using reclaimed (nonpotable) water when feasible.

Exposed ground areas that are planned to be reworked more than one (1) month after initial grading should be sown with a fast-germinating native grass seed and watered until vegetation is established.

All areas to be paved (i.e. access road to the sediment basin) should be completed as soon as possible.

All trucks hauling dirt, sand, soil or other loose materials are to be covered or shall maintain at least two (2) feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with CVC Section 23114.

Streets shall be swept at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed (non-potable) water should be used where feasible.

Diesel idling shall not be permitted.

Signs that specify the no idling requirement shall be posted and enforced at the construction site.

Use of alternative-fueled equipment is recommended whenever possible.

The contractor shall designate a person or persons to monitor and implement these measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity and to prevent the transport of dust off-site. The name and telephone number of such persons shall be provided to the Air Pollution Control District (APCD) prior to the start of any grading-related activities. (See MM 9.1 for erosion control measures).

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 3.2: All portable equipment (50 horsepower or greater) used during grading operations must be issued a permit by either the California Air Resources Board (CARB) or the APCD. (Contact the APCD Engineering Division at (805) 781-5912 for specific information regarding permitting requirements prior to start of the project).

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction

Page 495 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 38 of 43 ends

MM 4.1: Construction/grading shall take place after the breeding season for the Yellow Warbler (April – July) to limit noise impacts. If construction/grading must start during this time period, surveys of nesting birds within the project vicinity shall be completed by a qualified wildlife biologist. If the surveys identify active nests of the Yellow Warbler within the project vicinity, all earthmoving activities shall cease until the chicks have fledged. The biologist shall provide the lead agency and responsible agencies with a written report of survey findings, and shall specify when the project work may safely commence.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 4.2: A qualified wildlife biologist shall complete and submit to the lead agency and responsible agencies a pre-construction survey for California red-legged frogs and Southwestern pond turtles. The survey shall be conducted during the time period when these species are known to be active. If no individuals are found, construction may proceed. If individuals are found during the initial investigation, the biologist shall conduct clearance surveys for these species approximately one (1) week prior to construction. Individuals found within the construction area will either be relocated to similar, adjacent habitats at least fifty (50) yards outside of the project area, or held in captivity until construction is complete. The project area shall be monitored during construction and appropriate measures taken to ensure that the individuals of relocated species do not move into the construction area. The decision of whether to relocate the animals shall be made by the biologist, although all mitigation activities would have to occur within the framework of any permits issued by the USFWS and CDFG.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 4.3: A qualified botanist shall conduct an initial site survey to map occurrence of Hoover’s bent grass, San Bernardino aster and black-flowered figwort. If sensitive plant species are found on site and determined to be potentially impacted, the botanist shall prepare procedures that ensure no net loss of plants. These include, but are not limited to, designating avoidance areas, transplanting the plant populations to an equivalent location on site, or replaced in-kind with new plants at a ratio of two (2) plants replaced for each one (1) lost or at a ratio acceptable to the botanist. The transplanted or replaced plants shall be monitored over a five (5) year period.

Any plants lost during this time period shall be replaced. The botanist shall prepare a planting, irrigation and maintenance plan that includes these provisions. If the botanist concludes that avoidance is a viable option, locations determined to be potentially impacted will be flagged against inadvertent or unintentional damage.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit

Page 496 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 39 of 43 ends

MM 4.4: The applicant shall acquire appropriate resource agency permits and undertake protection measures as required by those agencies.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 5.1: In the event that prehistoric cultural materials or historic cultural materials are encountered, work in the immediate vicinity of the finds shall be suspended until reviewed by an archaeologist, and the City shall be notified immediately should such resources be discovered. The archaeologist shall work as quickly as possible to permit resumption of construction activities. It is preferred that location data of finds be recorded using a hand-held global positioning system (GPS) receiver.

If human remains are encountered and determined to be Native American in origin, the San Luis Obispo County coroner will notify the Native American Heritage Commission (NAHC) within 24 hours of the find. The NAHC shall identify the person or persons it believes to be the most likely descendent of the deceased Native American. The most likely descendent may make recommendations for means of treating or disposing of the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 5.2: The note below shall be placed on the grading and improvement plans for the project:
“If human remains (burials) are encountered, the County Coroner shall be contacted immediately (805-781-4513). In the event that previously unidentified potentially significant cultural resources are discovered, an archaeologist shall have the authority to divert or temporarily halt ground disturbance operations in the area of discovery to allow evaluation of potentially significant cultural resources in consultation with Northern Chumash Tribal Council. For significant cultural resources, a Research Design and Data Recovery Program to mitigate impacts shall be prepared by the consulting archaeologist and approved by the City, then carried out using professional archaeological methods. If it can be demonstrated that a project will cause damage to a unique archaeological resource, the City may require reasonable efforts to be made to permit any or all of these resources to be preserved in place or left in an undisturbed state.” Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit

Page 497 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 40 of 43 ends

MM 9.1: The applicant shall prepare a Storm Water Pollution Prevention Plan (SWPPP) and Erosion Control Plan that specifies the implementation of Best Management Practices (BMPs) to avoid and minimize water quality impacts as required by the Regional Water Quality Control Board (RWQCB). At a minimum, the SWPP and Erosion Control Plan shall include:

Designation of equipment and supply staging and storage areas at least 100 feet from the outside edge of the creek 25-foot setback area. All vehicle parking, routine equipment maintenance, fueling, minor repair, etc., and soil and material stockpile, shall be done only in the designated staging area.

Major vehicle/equipment maintenance, repair, and equipment washing shall be performed off site.

A wet and dry spill cleanup plan that specifies reporting requirements and immediate clean up to ensure no residual soil, surface water or groundwater contamination would remain after clean up.

Designating concrete mixer washout areas at least 100 feet from outside edge of the creek 25-foot setback with the use of appropriate containment or reuse practices.

A temporary and excess fill stockpile and disposal plan that ensures that no detrimental affects to receiving waters would result.

Required site preparation and erosion control BMPs for any work that may need to be completed after October 15.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 9.2: To reduce erosion hazards due to construction activities, grading shall be minimized, and project contractors shall use runoff and sediment control structures, and/or establish a permanent plant cover on side slopes following construction.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction MM 9.3: Erosion control and bank stabilization measures shall be implemented for any work that requires access to the creek, subject to CDFW approval through a Streambed Alteration Permit. These measures shall be clearly indicated on the grading plan.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction

Page 498 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 41 of 43 ends

MM 9.4: All temporary fill placed during project construction shall be removed at project completion and the area restored to approximate pre-project contours and topography.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to final inspection
MM 9.5: The project is located within a regulatory floodway. The applicant shall obtain all required permits from regulatory agencies (City of Arroyo Grande, Regional Water Quality Control Board, US Army Corps of Engineers, Ca. Dept. of Fish and Wildlife, etc.) and meet any relevant FEMA requirements associated with a regulatory floodway as necessary.

Level of Significance: Less than significant impact
Implementing Responsibility: Coastal San Luis Resource Conservation District Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit
MM 12.1: Construction activities shall be restricted to the hours of 8:00 AM to 5:00 PM Monday through Friday. On-site equipment maintenance and servicing shall be confined to the same hours.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 12.2: All construction equipment utilizing internal combustion engines shall be required to have mufflers that are in good condition. Stationary noise sources shall utilize noise reducing engine housing enclosures or noise screens.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: During construction
MM 12.3: A note shall be placed on the construction plans that no more than two (2) pieces of major earth moving equipment shall be allowed to operate simultaneously.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction

Page 499 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 42 of 43 ends

MM 12.4: All residential units located within five hundred feet (500’) of the construction site shall be sent a notice regarding the construction schedule of the project. A clearly legible sign shall also be posted at the project site. All notices and the signs shall indicate the expected dates and duration of construction activities, as well as provide a telephone number that residents can call to resolve any concerns about construction noise.

Level of Significance: Less than significant impact
Implementing Responsibility: Construction Manager
Monitoring Agency: City of Arroyo Grande, Community Development Dept.

Timing: Prior to issuance of grading permit and during construction

Page 500 of 1114 ends

INITIAL STUDY / MITIGATED NEGATIVE DECLARATION March 2013 Corbett Creek Floodplain and Stream Restoration Project

Page 43 of 43 ends

References
Documents & Maps

1. Arroyo Grande General Plan

2. Arroyo Grande Municipal Code

3. Arroyo Grande Zoning Map

4. Arroyo Grande Existing Settings Report & Draft Arroyo Grande Existing Settings Report (2010)

5. Arroyo Grande Urban Water Management Plan

6. Arroyo Grande Stormwater Management Plan

7. San Luis Obispo Important Farmland Map (California Department of Conservation, 2006)

8. CEQA & Climate Change White Paper (CAPCOA, 2008)

9. Air Quality Handbook (SLO APCD, 2009)

10. Project Plans – Swanson Hydrology & Geomorphology

11. Site Inspection

12. Arroyo Grande Creek Erosion, Sedimentation and Flooding Alternatives Study, Swanson Hydrology & Geomorphology, January 4, 2006

13. Letter from the Natural Resources Conservation Service regarding land eligibility report for Clark WRO Offering, dated December 19, 2006

Page 501 of 1114 ends

MITIGATION MONITORING

AND REPORTING PROGRAM (MMRP)
______________________________________________
Staff Project No. 13-001
Corbett Creek Floodplain and Stream Restoration Project ADOPTED BY:

CITY OF ARROYO GRANDE

PLANNING COMMISSION
DATE:

APRIL 16, 2013

EXHIBIT D

Page 502 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013
2 Introduction
A Mitigated Negative Declaration (MND) was prepared to comply with the California Environmental Quality Act (CEQA) for the Corbett Creek Floodplain and Stream Restoration Project (the “Project”). The MND identified potential environmental impacts as well as mitigation measures to reduce the impacts, where feasible.

CEQA requires that mitigation measures identified in environmental review documents are implemented after a project is approved. Therefore, this Mitigation Monitoring and Reporting Program (MMRP) has been prepared to ensure compliance with the adopted mitigation measures during the pre-construction, construction, and post-construction phases of the Project. The mitigation measures listed herein will be adopted by the Arroyo Grande Planning Commission as part of the overall project approval.

Per Public Resources Code Section 21081.6 the measures listed in the table below constitute the mitigation monitoring and/or reporting program that will reduce potentially significant impacts to less than significant levels. These measures will become conditions of approval (COAs) should the project be approved. The Lead Agency (City of Arroyo Grande) or other Responsible Agencies, as specified in the following measures, are responsible to verify compliance with these COAs.

Mitigation is defined by the California Environmental Quality Act (CEQA) as a measure which:
 Avoids the impact altogether by not taking a certain action or parts of an action.  Minimizes impacts by limiting the degree or magnitude of the action and its implementation.
 Rectifies the impact by repairing, rehabilitating, or restoring the impacted environment.
 Reduces or eliminates the impact over time by preservation and maintenance operations during the life of the Project.
 Compensates for the impact by replacing or providing substitute resources or environments.

The mitigation measures discussed in the table below have been identified as feasible and effective in mitigating Project-related environmental impacts.

Project Location
The project reach begins at the Highway 227 Bridge over Tally Ho Creek and extends upstream to the east end of the Clark property (APN 007-791-032).

Project Description
The proposed project involves the acquisition by the Coastal San Luis Resource Conservation District (RCD) of a conservation easement over the 12.5-acre Clark Property located between Highway 227 (Carpenter Canyon Road) and Corbett Canyon Road and the design, permitting and construction of a floodplain/sediment detention basin on the easement property. The project also includes channel restoration of approximately nine hundred feet (900’) of Corbett Creek located downstream of the

Page 503 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013
3 Clark Property. Currently there are no identified implementation funds for the channel restoration component of the project. The City will be directly involved in the project through permitting of the floodplain/sediment detention basin design and implementation activities.

The Project goals are:

1. Increase sediment capture on floodplain easement

2. Increase flood attenuation on floodplain easement

3. Enhance floodplain wetland for flood attenuation and habitat The Project will construct a sediment basin and enhance a floodplain wetland resulting in an estimated 524 tons of sediment per year settled into a basin, reduced peak flows in storms with recurrence intervals of ten (10) years or greater, and three (3) acres of floodplain wetland enhanced.

Program Implementation and Monitoring
Each mitigation measure is described in the following format:

Requirements of
Measure
The description of the mitigation measures.

Mitigation Level The level to which the impact is anticipated to be mitigated.

Implementing
Responsibility
The agency or individual that has the responsibility for implementing or performing the measure.

Monitoring
Responsibility
The public agency that has the responsibility for monitoring to ensure that the mitigation measure is effective in mitigating the impact.

Compliance
Standards
The method used to verify compliance.

Timing The appropriate points in time at which the mitigation measure is to be initiated and completed.

Page 504 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 4 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
Air Quality3.1 The following conditions shall be
included on all project plans and
adhered to for all grading‐related
permits:
 Reduce the amount of disturbed
area where possible.
 Use water trucks or sprinkler
systems in sufficient quantities to
prevent airborne dust from leaving
the site. Increase wateringfrequency when wind speeds
exceed 15 MPH. Reclaimed (non‐
potable) water shall be usedwhenever possible.
 All dirt stockpile areas should be
sprayed daily or as needed using
reclaimed (non‐potable) water
when feasible.
 Exposed ground areas that are
planned to be reworked more
than one (1) month after initial
grading should be sown with a
fast‐germinating native grass seed
and watered until vegetation isestablished.
 All areas to be paved (i.e. access
road to the sediment basin) shouldbe completed as soon as possible.

Less thansignificantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Initial site check to
ensure measures are in
place. Bi‐weekly site
checks to ensure
construction area isswept or wateredregularly.

Prior to
issuance ofgrading
permit and
duringconstruction.

Page 505 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 5 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
 All trucks hauling dirt, sand, soil or
other loose materials are to be
covered or shall maintain at least
two (2) feet of freeboard
(minimum vertical distance
between top of load and top of
trailer) in accordance with CVC
Section 23114.
 Streets shall be swept at the end
of each day if visible soil material
is carried onto adjacent pavedroads. Water sweepers with reclaimed (non‐potable) water
should be used where feasible.
 Diesel idling shall not be
permitted.
 Signs that specify the no idling
requirement shall be posted and
enforced at the construction site.
 Use of alternative‐fueled
equipment is recommended
whenever possible.
 The contractor shall designate a
person or persons to monitor and
implement these measures as
necessary to minimize dustcomplaints, reduce visibleemissions below 20% opacity andto prevent the transport of dust

Page 506 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 6 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
off‐site. The name and telephone
number of such persons shall beprovided to the Air Pollution Control District (APCD) prior to the
start of any grading‐relatedactivities. (See MM 9.1 for erosion control measures).

3.2 All portable equipment (50
horsepower or greater) used during
grading operations must be issued a
permit by either the California Air
Resources Board (CARB) or the APCD.
(Contact the APCD Engineering
Division at (805) 781‐5912 for specific
information regarding permitting
requirements prior to start of theproject).

Less than
significant
impact
ConstructionManager
City of A.G.,CommunityDevelopmentDept.

Project plans shall
indicate type and
horsepower of proposed
equipment used during
grading operations.

Follow up with APCD if
necessary.

Prior to
issuance ofgradingpermit and
duringconstruction.

Biological Resources4.1 Construction/grading shall take place after the breeding season for the
Yellow Warbler (April – July) to limit
noise impacts. If onstruction/grading
must start during this time period,
surveys of nesting birds within the
project vicinity shall be completed by
a qualified wildlife biologist. If the
surveys identify active nests of the
Less thansignificantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
The Construction
Manager shall inform the
Community Development
Dept. when grading
activities are expected to
commence. If gradingmust occur between
April and July, pre‐
construction biological
Prior to
issuance ofgradingpermit.

Page 507 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 7 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
Yellow Warbler within the project
vicinity, all earthmoving activities
shall cease until the chicks have
fledged. The biologist shall provide
the lead agency and responsibleagencies with a written report ofsurvey findings, and shall specifywhen the project work may safely commence.
surveys shall be
submitted to the City,
CSRCD, CDFW and FWS
prior to issuance of
grading permit.

4.2 A qualified wildlife biologist shall
complete and submit to the lead
agency and responsible agencies a
pre‐construction survey for California
red‐legged frogs and Southwestern
pond turtles. The survey shall be
conducted during the time periodwhen these species are known to be active. If no individuals are found,
construction may proceed. If
individuals are found during the
initial investigation, the biologist shall
conduct clearance surveys for thesespecies approximately one (1) week prior to construction. Individuals
found within the construction area
will either be relocated to similar,
adjacent habitats at least fifty (50)yards outside of the project area, or Less thansignificant
impact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Pre‐constructionbiological surveys shall
be conducted accordingto the mitigation
language and submitted
to the City, CSRCD, CDFW
and FWS prior to
issuance of grading
permit. If individuals ofspecial status species arefound, a biologist shall be retained to prepare
recommendations and
monitor the project area
during construction.

Prior to
issuance ofgradingpermit and
duringconstruction.

Page 508 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 8 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
held in captivity until construction is
complete. The project area shall bemonitored during construction and appropriate measures taken to
ensure that the individuals of
relocated species do not move into
the construction area. The decision
of whether to relocate the animals
shall be made by the biologist,although all mitigation activities would have to occur within the
framework of any permits issued bythe USFWS and CDFG.

4.3 A qualified botanist shall conduct an
initial site survey to map occurrence
of Hoover’s bent grass, San
Bernardino aster and black‐floweredfigwort. If sensitive plant species are found on site and determined to be
potentially impacted, the botanist
shall prepare procedures that ensureno net loss of plants. These include, but are not limited to, designating
avoidance areas, transplanting theplant populations to an equivalent location on site, or replaced in‐kind
with new plants at a ratio of two (2)
plants replaced for each one (1) lost
Less thansignificantimpact
ConstructionManager
City of A.G.,
CommunityDevelopment
Department
Pre‐constructionbotanical surveys shall be
conducted according to
the mitigation languageand submitted to theCity, CSRCD, CDFW and FWS prior to issuance of
grading permit. Ifindividuals of special
status plant species are
found, a botanist shall be
retained to prepare
recommendations.

Prior to
issuance of
gradingpermit.

Page 509 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 9 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
or at a ratio acceptable to the
botanist. The transplanted or
replaced plants shall be monitored
over a five (5) year period. Anyplants lost during this time period shall be replaced. The botanist shallprepare a planting, irrigation andmaintenance plan that includes these provisions. If the botanist concludes
that avoidance is a viable option,
locations determined to be
potentially impacted will be flagged
against inadvertent or unintentional
damage.

4.4 The applicant shall acquire
appropriate resource agency permits
and undertake protection measuresas required by those agencies.

Less thansignificantimpact
Coastal SanLuis ResourceConservationDistrict(CSRCD)
City of A.G.,
CommunityDevelopmentDepartment
CSRCD shall provide the
City with applicable
resource agency permits.

Prior to
issuance of
grading
permit.

Cultural Resources5.1 In the event that prehistoric cultural materials or historic cultural
materials are encountered, work in
the immediate vicinity of the finds
shall be suspended until reviewed by
an archaeologist, and the City shall
be notified immediately should such
Less than
significantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
The mitigation measure
language shall beincluded on theconstructionspecifications.

Duringconstruction.

Page 510 of 1114 ends

MMRP
Corbett Creek Floodplain and Stream Restoration Project April 2013 10 MM # Requirements of Measure Mitigation
Level
ImplementingResponsibility
MonitoringResponsibility
Compliance Standards(Note: All MitigationMeasures shall beincluded on the projectplans).

Timing Verification of
Compliance(Initials / Date /Remarks)
resources be discovered. Thearchaeologist shall work as quickly aspossible to permit resumption of construction activities. It is preferred
that location data of finds be
recorded using a hand‐held global
positioning system (GPS) receiver.

If human remains are encountered
and determined to be Native
American in origin, the San Luis
Obispo County coroner will notify the
Native American Heritage
Commission (NAHC) within 24 hours
of the find. The NAHC shall identifythe person or persons it believes to be the most likely descendent of the
deceased Native American. The most
likely descendent may make
recommendations for means of
treating or disposing of the human
remains and any associated gravegoods as provided in Public Resources Code Section 5097.98.

5.2 The note below shall be placed on
the grading and improvement plans
for the project:

Less than
significantimpact
ConstructionManager
City of A.G.,
CommunityDevelopmentDepartment
Mitigation measure shall
be included on the
constructionspecifications.

Prior to
issuance of
gradingpermit.

Page 511 of 1114 ends