Cities Index.
Minutes, regular meeting, second session

Bakersfield City Council
July 23, 2025

Document
Minutes, regular meeting, second session
Meeting
July 23, 2025
Body
Bakersfield City Council
Pages
24
Original file
115.4 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

GENERAL LIABILITY DELUXE ENDORSEMENT:

HUMAN SERVICES
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE
It is understood and agreed that the following extensions only apply in the event that no other specific coverage for the indicated loss exposure is provided under this policy. If such specific coverage applies, the terms, conditions and limits of that coverage are the sole and exclusive coverage applicable under this policy, unless otherwise noted on this endorsement. The following is a summary of the Limits of Insurance and additional coverages provided by this endorsement. For complete details on specific coverages, consult the policy contract wording.

Coverage Applicable Limit of Insurance Page #
Extended Property Damage Included 2
Limited Rental Lease Agreement Contractual Liability $50,000 limit 2 Non-Owned Watercraft Less than 58 feet 2
Damage to Property You Own, Rent, or Occupy $30,000 limit 2 Damage to Premises Rented to You $1,000,000 3
HIPAA Clarification 4
Medical Payments $20,000 5
Medical Payments Extended Reporting Period 3 years 5
Athletic Activities Amended 5
Supplementary Payments Bail Bonds $5,000 5
Supplementary Payment Loss of Earnings $1,000 per day 5 Employee Indemnification Defense Coverage $25,000 5
Key and Lock Replacement Janitorial Services Client Coverage $10,000 limit 6 Additional Insured Newly Acquired Time Period Amended 6 Additional Insured Medical Directors and Administrators Included 7 Additional Insured Managers and Supervisors (with Fellow Employee Coverage)
Included 7
Additional Insured Broadened Named Insured Included 7
Additional Insured Funding Source Included 7
Additional Insured Home Care Providers Included 7
Additional Insured Managers, Landlords, or Lessors of Premises Included 7 Additional Insured Lessor of Leased Equipment Included 7 Additional Insured Grantor of Permits Included 8
Additional Insured Vendor Included 8
Additional Insured Franchisor Included 9
Additional Insured When Required by Contract Included 9 Additional Insured Owners, Lessees, or Contractors Included 9 Additional Insured State or Political Subdivisions Included 10 Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 2 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
Duties in the Event of Occurrence, Claim or Suit Included 10 Unintentional Failure to Disclose Hazards Included 10
Transfer of Rights of Recovery Against Others To Us Clarification 10 Liberalization Included 11
Bodily Injury includes Mental Anguish Included 11
Personal and Advertising Injury includes Abuse of Process, Discrimination
Included 11
A. Extended Property Damage

SECTION I COVERAGES, COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY, Subsection 2. Exclusions, Paragraph a. is deleted in its entirety and replaced by the following:
a. Expected or Intended Injury
This exclusion does not apply t
reasonable force to protect persons or property.

B. Limited Rental Lease Agreement Contractual Liability SECTION I COVERAGES, COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE LIABILITY, Subsection 2. Exclusions, Paragraph b. Contractual Liability is amended to include the following:
(3)
named insured for their liability assumed in a contract or agreement regarding the rental or lease of a premises on behalf of their client, up to $50,000. This coverage extension only applies to rental lease agreements.
liability insurance of the client.

C. Non-Owned Watercraft

SECTION I COVERAGES, COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY, Subsection 2. Exclusions, Paragraph g. (2) is deleted in its entirety and replaced by the following:
(2) A watercraft you do not own that is:
(a) Less than 58 feet long; and
(b) Not being used to carry persons or property for a charge; This provision applies to any person, who with your consent, either uses or is responsible for the use of a watercraft. This insurance is excess over any other valid and collectible insurance available to the insured whether primary, excess or contingent.

D. Damage to Property You Own, Rent or Occupy

SECTION I COVERAGES, COVERAGE A BODILY INJURY AND PROPERTY DAMAGE Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 3 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
LIABILITY, Subsection 2. Exclusions, Paragraph j. Damage to Property, Item (1) is deleted in its entirety and replaced with the following:
(1) Property you own, rent, or occupy, including any costs or expenses incurred by you, or any other person, organization or entity, for repair, replacement, enhancement, restoration or maintenance of such property for any reason, including prevention of injury your client, up to a $30,000 limit. A client is defined as a person under your direct care and supervision.

E. Damage to Premises Rented to You

1. If damage by fire to premises rented to you is not otherwise excluded from this Coverage Part, the w
a. The last paragraph of SECTION I COVERAGES, COVERAGE A BODILY INJURY AND PROPERTY DAMAGE LIABILITY, Subsection 2. Exclusions; is deleted in its entirety and replaced by the following:

Exclusions c. through n. do not apply to damage by fire, lightning, explosion, smoke, or leakage from automatic fire protective systems to premises while rented to you or temporarily occupied by you with permission of the owner. A separate limit of insurance applies to this coverage as described in SECTION III LIMITS OF INSURANCE. b. SECTION III LIMITS OF INSURANCE, Paragraph 6. is deleted in its entirety and replaced by the following:

Subject to Paragraph 5. above, the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of "property damage" to any one premises, while rented to you, or in the case of damage by fire, lightning, explosion, smoke, or leakage from automatic fire protective systems while rented to you or temporarily occupied by you with permission of the owner. c. SECTION V DEFINITIONS, Paragraph 9.a., is deleted in its entirety and replaced by the following:

A contract for a lease of premises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire, lightning, explosion, smoke, or leakage from automatic fire protective systems to premises while rented to you or temporarily occupied by you with permission of the owner is not an "insured contract";

2. SECTION IV COMMERCIAL GENERAL LIABILITY CONDITIONS, Subsection 4. Other Insurance, Paragraph b. Excess Insurance, (1) (a) (ii) is deleted in its entirety and replaced by the following:

That is insurance for fire, lightning, explosion, smoke, or leakage from automatic fire protective systems for premises rented to you or temporarily occupied by you with permission of the owner;

3. The Damage To Premises Rented To You Limit section of the Declarations is amended to the greater of:

Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 4 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
a. $1,000,000; or
b. The amount shown in the Declarations as the Damage to Premises Rented to You Limit.

This is the most we will pay for all damage proximately caused by the same event, whether such damage results from fire, lightning, explosion, smoke, or leaks from automatic fire protective systems or any combination thereof.

F. HIPAA

SECTION I COVERAGES, COVERAGE B PERSONAL AND ADVERTISING INJURY LIABILITY, is amended as follows:

1. Paragraph 1. Insuring Agreement is amended to include the following:

We will pay those sums that the insured becomes legally obligated to pay as damages because ity and Accountability Act (HIPAA). We have

2. Paragraph 2. Exclusions is amended to include the following additional exclusions:

This insurance does not apply to:
a. Intentional, Willful, or Deliberate Violations
b. Criminal Acts
riminal penalties under the HIPAA.
c. Other Remedies
Any remedy other than monetary damages for penalties assessed. d. Compliance Reviews or Audits
Any compliance reviews by the Department of Health and Human Services.

3. SECTION V DEFINITIONS is amended to include the following additional definitions:
a.
b.
c. regulations included in the
HIPAA.

Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 5 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
G. Medical Payments Limit Increased to $20,000, Extended Reporting Period If COVERAGE C MEDICAL PAYMENTS is not otherwise excluded from this Coverage Part:

1. The Medical Expense Limit is changed subject to all of the terms of SECTION III - LIMITS OF INSURANCE to the greater of:
a. $20,000; or
b. The Medical Expense Limit shown in the Declarations of this Coverage Part.

2. SECTION I COVERAGE, COVERAGE C MEDICAL PAYMENTS, Subsection 1. Insuring Agreement, a. (3) (b) is deleted in its entirety and replaced by the following:
(b) The expenses are incurred and reported to us within three years of the date of the accident.

H. Athletic Activities
SECTION I COVERAGES, COVERAGE C MEDICAL PAYMENTS, Subsection 2. Exclusions, Paragraph e. Athletic Activities is deleted in its entirety and replaced with the following:
e. Athletic Activities
To a person injured while taking part in athletics.

I. Supplementary Payments
SECTION I COVERAGES, SUPPLEMENTARY PAYMENTS - COVERAGE A AND B are amended as follows:

1. b. is deleted in its entirety and replaced by the following:

1. b. Up to $5000 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these.

1.d. is deleted in its entirety and replaced by the following:

1. d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or defense of the claim or "suit", including actual loss of earnings up to $1,000 a day because of time off from work.

J. Employee Indemnification Defense Coverage
SECTION I COVERAGES, SUPPLEMENTARY PAYMENTS COVERAGES A AND B the following is added:

We will pay
occurring in the course of employment.
proceeding is $25,000 regardl
.

Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 6 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
K. Key and Lock Replacement Janitorial Services Client Coverage SECTION I COVERAGES, SUPPLEMENTARY PAYMENTS COVERAGES A AND B is amended to include the following:

W
, up to a $10,000 limit per occurrence and $10,000
policy aggregate.

We will not pay for loss or damage resulting from theft or any other dishonest or criminal act that authorized representatives or any one to
purpose commit, whether acting alone or in collusion with other persons.

The following, when used on this coverage, are defined as follows:
a. "Client" means an individual, company or organization with whom you have a written contract or work order for your services for a described premises and have billed for your services. b. "Employee" means:
(1) Any natural person:
(a) While in your service or for 30 days after termination of service; (b) Who you compensate directly by salary, wages or commissions; and (c) Who you have the right to direct and control while performing services for you; or (2) Any natural person who is furnished temporarily to you:
(a) To substitute for a permanent "employee" as defined in Paragraph (1) above, who is on leave; or
(b) To meet seasonal or short-term workload conditions; while that person is subject to your direction and control and performing services for you. (3) "Employee" does not mean:
(a) Any agent, broker, person leased to you by a labor leasing firm, factor, commission merchant, consignee, independent contractor or representative of the same general character; or
(b) Any "manager," director or trustee except while performing acts coming within the scope of the usual duties of an "employee."
c. "Manager" means a person serving in a directorial capacity for a limited liability company.

L. Additional Insureds
SECTION II WHO IS AN INSURED is amended as follows:

1. If coverage for newly acquired or formed organizations is not otherwise excluded from this Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 7 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
Coverage Part, Paragraph 3.a. is deleted in its entirely and replaced by the following:
a. Coverage under this provision is afforded until the end of the policy period.

2. Each of the following is also an insured:
a. Medical Directors and Administrators Your medical directors and administrators, but only while acting within the scope of and during the course of their duties as such. Such duties do not include the furnishing or failure to furnish professional services of any physician or psychiatrist in the treatment of a patient.
b. Managers and Supervisors Your managers and supervisors are also insureds, but only with respect to their duties as your managers and supervisors. Managers and -
employment by you or performing duties
related to the conduct of your business.

This provision does not change Item 2.a.(1)(a) as it applies to managers of a limited liability company.
c. Broadened Named Insured Any organization and subsidiary thereof which you control and actively manage on the effective date of this Coverage Part. However, coverage does not apply to any organization or subsidiary not named in the Declarations as Named Insured, if they are also insured under another similar policy, but for its termination or the exhaustion of its limits of insurance.
d. Funding Source Any person or organization with respect to their liability arising out of:
(1) Their financial control of you; or
(2) Premises they own, maintain or control while you lease or occupy these premises.

This insurance does not apply to structural alterations, new construction and demolition operations performed by or for that person or organization. e. Home Care Providers At the first Named Insured's option, any person or organization under your direct supervision and control while providing for you private home respite or foster home care for the developmentally disabled.
f. Managers, Landlords, or Lessors of Premises Any person or organization with respect to their liability arising out of the ownership, maintenance or use of that part of the premises leased or rented to you subject to the following additional exclusions:

This insurance does not apply to:
(1) e a tenant in that premises; or
(2) Structural alterations, new construction or demolition operations performed by or on behalf of that person or organization.
g. Lessor of Leased Equipment Automatic Status When Required in Lease Agreement With You Any person or organization from whom you lease equipment when you and such person or organization have agreed in writing in a contract or agreement that such person or organization is to be added as an additional insured on your policy. Such person or Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 8 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
or
aused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person or organization.

A
when their contract or agreement with you for such leased equipment ends.

With respect to the insurance afforded to these additional insureds, this insurance does not h. Grantors of Permits Any state or political subdivision granting you a permit in connection with your premises subject to the following additional provision:
(1) This insurance applies only with respect to the following hazards for which the state or political subdivision has issued a permit in connection with the premises you own, rent or control and to which this insurance applies:
(a) The existence, maintenance, repair, construction, erection, or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoist away openings, sidewalk vaults, street banners or decorations and similar exposures;
(b) The construction, erection, or removal of elevators; or (c) The ownership, maintenance, or use of any elevators covered by this insurance. i. Vendors
which are distributed or sold in the regular course of the vendor's business, subject to the following additional exclusions:
(1) The insurance afforded the vendor does not apply to:
(a) "Bodily injury" or "property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in the absence of the contract or agreement;
(b) Any express warranty unauthorized by you;
(c) Any physical or chemical change in the product made intentionally by the vendor; (d) Repackaging, except when unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container; (e) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products; (f) Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product; Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 9 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
(g) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor; or
(h) "Bodily injury" or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to:
(i) The exceptions contained in Sub-paragraphs (d) or (f); or (ii) Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. (2) This insurance does not apply to any insured person or organization, from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing.
j. Franchisor Any person or organization with respect to their liability as the grantor of a franchise to you.
k. As Required by Contract Any person or organization where required by a written contract executed prior to the occurrence of a loss. Such person or organization is an additional insured for "bodily injury," "property damage" or "personal and advertising injury" but only for liability arising out of the negligence of the named insured. The limits of insurance applicable to these additional insureds are the lesser of the policy limits or those limits specified in a contract or agreement. These limits are included within and not in addition to the limits of insurance shown in the Declarations
l. Owners, Lessees or Contractors Any person or organization, but only with respect to liability for "bodily injury," "property damage" or "personal and advertising injury" caused, in whole or in part, by:
(1) Your acts or omissions; or
(2) The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured when required by a contract.

With respect to the insurance afforded to these additional insureds, the following additional exclusions apply:

This insurance does not apply to "bodily injury" or "property damage" occurring after:
(a) All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or
(b) That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project.

Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 10 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
m. State or Political Subdivisions Any state or political subdivision as required, subject to the following provisions:
(1) This insurance applies only with respect to operations performed by you or on your behalf for which the state or political subdivision has issued a permit, and is required by contract.
(2) This insurance does not apply to:
(a) "Bodily injury," "property damage" or "personal and advertising injury" arising out of operations performed for the state or municipality; or
(b) "Bodily injury" or "property damage" included within the "products-completed operations hazard."
M. Duties in the Event of Occurrence, Claim or Suit
SECTION IV COMMERCIAL GENERAL LIABILITY CONDITIONS, Paragraph 2. is amended as follows:
a. is amended to include:

This condition
(1) You, if you are an individual;
(2) A partner, if you are a partnership; or
(3) An executive officer or insurance manager, if you are a corporation. b. is amended to include:

This condition
is known to:
(1) You, if you are an individual;
(2) A partner, if you are a partnership; or
(3) An executive officer or insurance manager, if you are a corporation.

N. Unintentional Failure To Disclose Hazards
SECTION IV COMMERCIAL GENERAL LIABILITY CONDITIONS, 6. Representations is amended to include the following:

It is agreed that, based on our reliance on your representations as to existing hazards, if you should unintentionally fail to disclose all such hazards prior to the beginning of the policy period of this Coverage Part, we shall not deny coverage under this Coverage Part because of such failure.

O. Transfer of Rights of Recovery Against Others To Us
SECTION IV COMMERCIAL GENERAL LIABILITY CONDITIONS, 8. Transfer of Rights of Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 11 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
Recovery Against Others To Us is deleted in its entirety and replaced by the following:

If the insured has rights to recover all or part of any payment we have made under this Coverage Part, those rights are transferred to us. The insured must do nothing after loss to impair them. At our request, the insured will bring "suit" or transfer those rights to us and help us enforce them.

Therefore, the i ecovery prior to the occurrence of a
loss, provided the waiver is made in a written contract.

P. Liberalization
SECTION IV COMMERCIAL GENERAL LIABILITY CONDITIONS, is amended to include the following:

If we revise this endorsement to provide more coverage without additional premium charge, we will automatically provide the additional coverage to all endorsement holders as of the day the revision is effective in your state.

Q. Bodily Injury Mental Anguish
SECTION V DEFINITIONS, Paragraph 3. Is deleted in its entirety and replaced by the following:
njury means:
a. Bodily injury, sickness or disease sustained by a person, and includes mental anguish resulting from any of these; and
b. Except for mental anguish, includes death resulting from the foregoing (Item a. above) at any time.

R. Personal and Advertising Injury Abuse of Process, Discrimination If COVERAGE B PERSONAL AND ADVERTISING INJURY LIABILITY COVERAGE is not otherwise excluded from this Coverage Part, the definition of amended as follows:

1. SECTION V DEFINITIONS, Paragraph 14.b. is deleted in its entirety and replaced by the following:
b. Malicious prosecution or abuse of process;

2. SECTION V DEFINITIONS, Paragraph 14. is amended by adding the following:

Discrimination based on race, color, religion, sex, age or national origin, except when:
a. Done intentionally by or at the direction of, or with the knowledge or consent of:
(1) Any insured; or
(2) Any executive officer, director, stockholder, partner or member of the insured; b. Directly or indirectly related to the employment, former or prospective employment, termination of employment, or application for employment of any person or persons by an insured;
Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 12 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
c. Directly or indirectly related to the sale, rental, lease or sublease or prospective sales, rental, lease or sub-lease of any room, dwelling or premises by or at the direction of any insured; or d. Insurance for such discrimination is prohibited by or held in violation of law, public policy, legislation, court decision or administrative ruling.

The above does not apply to fines or penalties imposed because of discrimination.

Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
2/28/2025
License # 0D44424
(661) 316-5184 (661) 281-4992
18058
Community Action Partnership of Kern
1300 18th St. # 200
Bakersfield, CA 93301
10855
A 1,000,000
X X PHPK2662179008 3/1/2025 3/1/2026 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2662179008 3/1/2025 3/1/2026
B
X COWC563393 7/31/2024 7/31/2025 1,000,000
1,000,000
1,000,000
The City Bakersfield, its mayor, council, officers, agents, employees and volunteers are additional insureds applies with respect to General Liability if required or agreed to in a written contract subject to all provisions and limitations of the policy per form#PIGLDHS1011 attached. General liability coverage is primary and noncontributory per form#PIGL0050712 attached. A Waiver of Subrogation in favor of The City Bakersfield, its mayor, council, officers, agents, employees and volunteers applies to the Workers Comp and General Liability if required or agreed to in a written contract subject to all provisions and limitations of the policy per form #WC990410C0119 attached.

City of Bakersfield
Office of Risk Management
1600 Truxtun Ave.

Bakersfield, CA 93301
COMMACT03C TRAMIREZ

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Josh Wall, CIC
[email protected]
Philadelphia Indemnity Insurance Company
Cypress Insurance Company
X
X
X
X
Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 6 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
K. Key and Lock Replacement Janitorial Services Client Coverage SECTION I COVERAGES, SUPPLEMENTARY PAYMENTS COVERAGES A AND B is amended to include the following:

W
, up to a $10,000 limit per occurrence and $10,000
policy aggregate.

We will not pay for loss or damage resulting from theft or any other dishonest or criminal act that

authorized representatives or any one to
purpose commit, whether acting alone or in collusion with other persons.

The following, when used on this coverage, are defined as follows:
a. "Client" means an individual, company or organization with whom you have a written contract or work order for your services for a described premises and have billed for your services. b. "Employee" means:
(1) Any natural person:
(a) While in your service or for 30 days after termination of service; (b) Who you compensate directly by salary, wages or commissions; and (c) Who you have the right to direct and control while performing services for you; or (2) Any natural person who is furnished temporarily to you:
(a) To substitute for a permanent "employee" as defined in Paragraph (1) above, who is on leave; or
(b) To meet seasonal or short-term workload conditions; while that person is subject to your direction and control and performing services for you. (3) "Employee" does not mean:
(a) Any agent, broker, person leased to you by a labor leasing firm, factor, commission merchant, consignee, independent contractor or representative of the same general character; or
(b) Any "manager," director or trustee except while performing acts coming within the scope of the usual duties of an "employee."
c. "Manager" means a person serving in a directorial capacity for a limited liability company.

L. Additional Insureds
SECTION II WHO IS AN INSURED is amended as follows:

1. If coverage for newly acquired or formed organizations is not otherwise excluded from this Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 7 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
Coverage Part, Paragraph 3.a. is deleted in its entirely and replaced by the following:
a. Coverage under this provision is afforded until the end of the policy period.

2. Each of the following is also an insured:
a. Medical Directors and Administrators Your medical directors and administrators, but only while acting within the scope of and during the course of their duties as such. Such duties do not include the furnishing or failure to furnish professional services of any physician or psychiatrist in the treatment of a patient.
b. Managers and Supervisors Your managers and supervisors are also insureds, but only with respect to their duties as your managers and supervisors. Managers and -
employment by you or performing duties
related to the conduct of your business.

This provision does not change Item 2.a.(1)(a) as it applies to managers of a limited liability company.
c. Broadened Named Insured Any organization and subsidiary thereof which you control and actively manage on the effective date of this Coverage Part. However, coverage does not apply to any organization or subsidiary not named in the Declarations as Named Insured, if they are also insured under another similar policy, but for its termination or the exhaustion of its limits of insurance.
d. Funding Source Any person or organization with respect to their liability arising out of:
(1) Their financial control of you; or
(2) Premises they own, maintain or control while you lease or occupy these premises.

This insurance does not apply to structural alterations, new construction and demolition operations performed by or for that person or organization. e. Home Care Providers At the first Named Insured's option, any person or organization under your direct supervision and control while providing for you private home respite or foster home care for the developmentally disabled.
f. Managers, Landlords, or Lessors of Premises Any person or organization with respect to their liability arising out of the ownership, maintenance or use of that part of the premises leased or rented to you subject to the following additional exclusions:

This insurance does not apply to:
(1) e a tenant in that premises; or
(2) Structural alterations, new construction or demolition operations performed by or on behalf of that person or organization.
g. Lessor of Leased Equipment Automatic Status When Required in Lease Agreement With You Any person or organization from whom you lease equipment when you and such person or organization have agreed in writing in a contract or agreement that such person or organization is to be added as an additional insured on your policy. Such person or Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 8 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
or
aused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person or organization.

A
when their contract or agreement with you for such leased equipment ends.

With respect to the insurance afforded to these additional insureds, this insurance does not

h. Grantors of Permits Any state or political subdivision granting you a permit in connection with your premises subject to the following additional provision:
(1) This insurance applies only with respect to the following hazards for which the state or political subdivision has issued a permit in connection with the premises you own, rent or control and to which this insurance applies:
(a) The existence, maintenance, repair, construction, erection, or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoist away openings, sidewalk vaults, street banners or decorations and similar exposures;
(b) The construction, erection, or removal of elevators; or (c) The ownership, maintenance, or use of any elevators covered by this insurance. i. Vendors
which are distributed or sold in the regular course of the vendor's business, subject to the following additional exclusions:
(1) The insurance afforded the vendor does not apply to:
(a) "Bodily injury" or "property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in the absence of the contract or agreement;
(b) Any express warranty unauthorized by you;

(c) Any physical or chemical change in the product made intentionally by the vendor; (d) Repackaging, except when unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container; (e) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products; (f) Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product; Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GLD-HS (10/11)

Page 9 of 12 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission. © 2011 Philadelphia Indemnity Insurance Company
(g) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor; or
(h) "Bodily injury" or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to:
(i) The exceptions contained in Sub-paragraphs (d) or (f); or (ii) Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. (2) This insurance does not apply to any insured person or organization, from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing.

j. Franchisor Any person or organization with respect to their liability as the grantor of a franchise to you.
k. As Required by Contract Any person or organization where required by a written contract executed prior to the occurrence of a loss. Such person or organization is an additional insured for "bodily injury," "property damage" or "personal and advertising injury" but only for liability arising out of the negligence of the named insured. The limits of insurance applicable to these additional insureds are the lesser of the policy limits or those limits specified in a contract or agreement. These limits are included within and not in addition to the limits of insurance shown in the Declarations
l. Owners, Lessees or Contractors Any person or organization, but only with respect to liability for "bodily injury," "property damage" or "personal and advertising injury" caused, in whole or in part, by:
(1) Your acts or omissions; or
(2) The acts or omissions of those acting on your behalf;

in the performance of your ongoing operations for the additional insured when required by a contract.

With respect to the insurance afforded to these additional insureds, the following additional exclusions apply:

This insurance does not apply to "bodily injury" or "property damage" occurring after:
(a) All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or
(b) That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project.

Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 PI-GL-005 (07/12)
Page of
Includes copyrighted material of Insurance Services Office, Inc., with its permission.

THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

ADDITIONAL INSURED

PRIMARY AND NON-CONTRIBUTORY INSURANCE
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART

SCHEDULE
Effective Date:

Name of Person or Organization (Additional Insured):

SECTION II – WHO IS AN INSURED is amended to include as an additional insured the person(s) or organization(s) shown in the endorsement Schedule, but only with respect to liability for “bodily injury,” “property damage” or “personal and advertising injury” arising out of or relating to your negligence in the performance of “your work” for such person(s) or organization(s) that occurs on or after the effective date shown in the endorsement Schedule.

This insurance is primary to and non-contributory with any other insurance maintained by the person or organization (Additional Insured), except for loss resulting from the sole negligence of that person or organization.

This condition applies even if other valid and collectible insurance is available to the Additional Insured for a loss or ”occurrence” we cover for this Additional Insured.

The Additional Insured’s limits of insurance do not increase our limits of insurance, as described in SECTION III – LIMITS OF INSURANCE. All other terms, conditions, and exclusions under the policy are applicable to this endorsement and remain unchanged.

Blanket As Required by Written Contract
03/01/2024
1 1
Docusign Envelope ID: 8203EBD5-6574-4814-90DD-E434FC087111 Certificate Of Completion
Envelope Id: 8203EBD5-6574-4814-90DD-E434FC087111 Status: Completed Subject: Complete with Docusign: Amendment 1 To Agreement 2022-199 CAPK.pdf Source Envelope:

Document Pages: 23 Signatures: 2 Envelope Originator:

Certificate Pages: 5 Initials: 1 City Clerk's Office
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
[email protected]
IP Address: 174.46.226.5
Record Tracking
Status: Original
7/3/2025 12:15:30 PM
Holder: City Clerk's Office
[email protected]
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Bakersfield Location: Docusign Signer Events Signature Timestamp
Jeremy Tobias
[email protected]
CEO
Community Action Partnership of Kern
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 12.76.40.22
Sent: 7/3/2025 12:17:35 PM
Viewed: 7/7/2025 8:23:07 AM
Signed: 7/9/2025 1:58:24 PM
Electronic Record and Signature Disclosure:

Accepted: 7/7/2025 8:23:07 AM
ID: eefac491-e1b5-4e1b-932b-66a6410ace95
Christian Clegg
[email protected]
City Manager
City of Bakersfield
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 174.46.226.5
Sent: 7/9/2025 1:58:25 PM
Viewed: 7/9/2025 3:01:08 PM
Signed: 7/9/2025 3:01:20 PM
Electronic Record and Signature Disclosure:

Accepted: 7/9/2025 3:01:08 PM
ID: b9f7c0bd-14e6-4c10-ae79-cf47947f77e9
Jena Covey
[email protected]

RISK MANAGER
Security Level: Email, Account Authentication
(None) Signature Adoption: Pre-selected Style
Using IP Address: 174.46.226.5
Sent: 7/9/2025 3:01:21 PM
Viewed: 7/9/2025 3:37:08 PM
Signed: 7/9/2025 3:39:03 PM
Electronic Record and Signature Disclosure:

Accepted: 7/9/2025 3:37:08 PM
ID: 0e8c2277-e349-46f3-91ed-14f8c34c3f52
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 7/3/2025 12:17:36 PM
Certified Delivered Security Checked 7/9/2025 3:37:08 PM Signing Complete Security Checked 7/9/2025 3:39:03 PM
Completed Security Checked 7/9/2025 3:39:03 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure

ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Bakersfield (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system.

Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below.

Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below.

Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us.

All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/28/2022 10:51:05 AM Parties agreed to: Jeremy Tobias, Christian Clegg, Jena Covey Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us.

How to contact City of Bakersfield:

You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows:

To contact us by email send messages to: [email protected] To advise City of Bakersfield of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at [email protected] and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address.

If you created a DocuSign account, you may update it with your new email address through your account preferences.

To request paper copies from City of Bakersfield
To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to [email protected] and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any.

To withdraw your consent with City of Bakersfield
To inform us that you no longer wish to receive future notices and disclosures in electronic format you may:
i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to [email protected] and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process..

Required hardware and software
The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guidesigning-system-requirements.

Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:
 You can access and read this Electronic Record and Signature Disclosure; and  You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and
 Until or unless you notify City of Bakersfield as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Bakersfield during the course of your relationship with City of Bakersfield.

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Zachary Meyer, Public Works Director
DATE: June 27, 2025
SUBJECT: Amendment No. 2 to Agreement No. 2023-010 with Harker Striping dba Harker Striping and Signage (increase compensation by $1,000,000 and extend the term to July 31, 2026) to provide on-call pavement striping and marking services for Public Works Street Maintenance Division.

RECOMMENDATION:

Staff recommends approval of the amendment.

BACKGROUND:

The Public Works Department’s Street Maintenance Division is responsible for pavement striping and marking on City-owned and maintained streets. Due to the increase in the number of street resurfacing projects, there is a need to supplement pavement striping and marking work performed by City staff.

Examples of pavement striping and marking services include, but are not limited to, various pavement markings, striping, and crosswalks.

Harker Striping, Inc., dba Harker Striping and Signage, will focus on newly resurfaced streets or applying thermoplastic striping and markings. Thermoplastic pavement markings don’t crack, chip, or shatter from impact, allowing for quicker striping and long-lasting results. The Streets Division does not have the equipment to install thermoplastic striping.

On July 24, 2024, Council approved Amendment No. 1 to Agreement No. 2023-010, increasing compensation by $500,000 with a new not to exceed amount of $1,000,000 and extending the term to July 31, 2025.

Harker Striping has continued to provide reliable and satisfactory pavement striping and marking services for the City of Bakersfield. Staff recommends approval of Amendment No. 2 to Agreement No. 2023-010 to increase the compensation by $1,000,000. The City has elected not to renew its agreement with the second striping vendor. As a result, Harker Striping will assume the additional workload previously performed by the other vendor, and the increased compensation reflects the expanded scope of services needed to meet the City’s ongoing striping demands.

FISCAL IMPACT:

The agreement will be funded with varying funding sources, including one-time Capital Improvement Funds, State Gas Tax Capital Improvement Funds, and the Street Division Street Maintenance General Fund Operating account.

COUNCIL GOAL:

Reliable Infrastructure
Safety and Resilience
ATTACHMENTS:

1. Harker ON CALL STRIPING - AMMENDMENT 2 signed

2. On Call Street Striping and Marking Services 2025 Exhibit B -- Page 1 of 3 Pages --
AGREEMENT NO. __________________
AMENDMENT NO. [2] TO
AGREEMENT NO. 2023-010
This AMENDMENT NO. 2 TO AGREEMENT NO. 2023-010 is made and entered into on ________________, by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and HARKER INC., dba HARKER STRIPING AND SIGNAGE, a Corporation authorized to do business in California (referred to herein as “CONTRACTOR”).

R E C I T A L S
WHEREAS, on January 11, 2023, CITY and CONTRACTOR entered into Agreement No. 2023-010 for pavement striping and marking services throughout the City of Bakersfield; and
WHEREAS, on July 2, 2024, Amendment No. 1 to Agreement No. 2023-010 amended the agreement to extend the term by one year and increase the compensation by Five Hundred Thousand dollars ($500,000) for a total not to exceed compensation of One Million Dollars ($1,000,000); and WHEREAS, CITY and CONTRACTOR desire to amend Agreement No. 2023- 010 to extend the Term of Agreement No. 2023-010 to July 31, 2026 and add additional compensation; and
WHEREAS, the CONTRACTOR has provided satisfactory service to the CITY and both parties desire to extend the Term for an additional year and increase compensation by One Million Dollars ($100,000,000) for a total not to exceed compensation of Two Million Dollars ($2,000,000).

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree as follows:

1. Section 2 of Agreement No. 2023-010 entitled
“COMPENSATION/PAYMENT PROCEDURE” is hereby amended to read as follows:

2. COMPENSATION/PAYMENT PROCEDURE. Subject to the
conditions of this section, CITY will pay CONTRACTOR as follows for performing the Scope of Work (“Compensation”):

An aggregate sum not to exceed TWO MILLION DOLLARS
($2,000,000) to be paid based on an hourly or
6/30/2025
-- Page 2 of 3 Pages --
time/material basis in accordance with the rates which are incorporated by reference herein and attached hereto as Exhibit “B”.

CITY will pay CONTRACTOR within 30 days after CONTRACTOR submits an itemized invoice for the portions of the Scope of Work completed and that invoice is approved by CITY. The Compensation will be the total amount paid to CONTRACTOR for performing the Scope of Work and includes, but is not limited to, all out-of-pocket costs and taxes. CITY will pay no other compensation to CONTRACTOR. In no case will CITY
compensate CONTRACTOR more than $2,000,000 for
performing the Scope of Work.

2. Section 3 of Agreement No. 2023-010 entitled “TERM” is hereby amended to read as follows:

3. TERM. Unless terminated sooner as set forth herein this Agreement shall terminate on July 31, 2026.

3. Except as amended herein, all provisions of Agreement No. 2023- 010 shall remain in full force and effect.

IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 2 to Agreement No. 2023-010 to be executed the day and year first above written.
“CITY” “CONTRACTOR”
CITY OF BAKERSFIELD HARKER INC., dba HARKER

STRIPING AND SIGNAGE
By:____________________________ By:_________________________________

KAREN GOH
Mayor Print Name: ________________________
Title: _______________________________
APPROVED AS TO CONTENT:

PUBLIC WORKS DEPARTMENT
By:____________________________

ZACHARY MEYER
Public Works Director
[Additional Signatures on Following Page]

TAMMI HARKER
OWNER
-- Page 3 of 3 Pages --
APPROVED AS TO FORM:

VIRGINIA GENNARO
City Attorney
By:____________________________

ASHLEY ZAMBRANO
Deputy City Attorney
COUNTERSIGNED:

By:____________________________

RANDY MCKEEGAN
Finance Director
JHR/em
Attachment: Exhibit “B”
S:\Public Works\Agrs\23-24\Harkerstripingsignageamendno.1toagrmtno.2023-010.Doc Proposal For: City of Bakersfield
Job Site: City of Bakersfield_On Call Street Striping and Marking Services (Updated 2025 Pricing) Submitted to: Kevin Peoples ([email protected]) City Roads Manager
C 661-510-4946
Date: 6-27-2025
__________________________________________________________________________________________________________________________________________ Scope of Work

ITEM ITEM DESCRIPTION UNIT OF ITEM UNIT UNIT
NO. MEASURE QUANTITY

PRICE PRICE
City of Bakersfield - On-Call Street Striping and Marking Services 2024 2025 PAINT TRAFFIC STRIPE (2-COAT) 1.05 1.05
DETAIL 1 STRIPE 1-5,000 $ 0.32 $ 0.33

1.00 (6" SINGLE YELLOW BROKEN LINE) LF 5,001-9000 $ 0.25 $ 0.26 CENTERLINE OVER 9,000 $ 0.19 $ 0.20
DETAIL 2 STRIPE 1-5,000 $ 0.37 $ 0.39

2.00 (6" SINGLE YELLOW BROKEN LINE) LF 5,001-9000 $ 0.30 $ 0.32 CENTERLINE OVER 9,000 $ 0.24 $ 0.25
DETAIL 8 STRIPE 1-5,000 $ 0.32 $ 0.33

3.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001-9000 $ 0.25 $ 0.26 LANE LINE OVER 9,000 $ 0.19 $ 0.20
DETAIL 9 STRIPE 1-5,000 $ 0.37 $ 0.39

4.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001-9,000 $ 0.30 $ 0.32 LANE LINE WITH MARKER OVER 9,000 $ 0.24 $ 0.25
DETAIL 12 STRIPE 1-5,000 $ 0.42 $ 0.44

5.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001-9,000 $ 0.34 $ 0.35 LANE LINE OVER 9,000 $ 0.26 $ 0.28
Exhibit "B" 1 of 7
DETAIL 12A STRIPE
1-5,000 $ 0.47 $ 0.50

6.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001
-9,000 $ 0.39 $ 0.41
LANE LINE WITH MARKER OVER 9,000 $ 0.32 $ 0.33
DETAIL 21 STRIPE
1-5,000 $ 0.58 $ 0.61

7.00 (6" DOUBLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 0.44 $ 0.46
NO PASSING ZONE OVER 9,000 $ 0.35 $ 0.36
DETAIL 22 STRIPE
1-5,000 $ 0.68 $ 0.72

8.00 (6" DOUBLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 0.55 $ 0.57
NO PASSING ZONE WITH MARKER OVER 9,000 $ 0.45 $ 0.47
DETAIL 24 STRIPE
1-5,000 $ 0.42 $ 0.44

9.00 (6" SINGLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 0.32 $ 0.33
LEFT EDGE LINE OVER 9,000 $ 0.26 $ 0.28
DETAIL 25A STRIPE
1-5,000 $ 0.47 $ 0.50

10.00 (6" SINGLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 0.37 $ 0.39
LEFT EDGE LINE WITH MARKER OVER 9,000 $ 0.32 $ 0.33
DETAIL 27B STRIPE
1-5,000 $ 0.42 $ 0.44

11.00 (6" SINGLE WHITE SOLID LINE) LF 5,001
-9,000 $ 0.32 $ 0.33
RIGHT EDGE LINE OVER 9,000 $ 0.26 $ 0.28
DETAIL 27C STRIPE
1-5,000 $ 0.26 $ 0.28

12.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001
-9,000 $ 0.23 $ 0.24
EXTENSION THRU INTERSECTION OVER 9,000 $ 0.19 $ 0.20
DETAIL 28 STRIPE
1-5,000 $ 0.84 $ 0.88

13.00 (6" DOUBLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 0.74 $ 0.77
MEDIAN ISLAND OVER 9,000 $ 0.68 $ 0.72
DETAIL 29 STRIPE
1-5,000 $ 0.95 $ 0.99

14.00 (6" DOUBLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 0.84 $ 0.88
MEDIAN ISLAND WITH MARKER OVER 9,000 $ 0.79 $ 0.83
DETAIL 31 STRIPE
1-5,000 $ 0.79 $ 0.83

15.00 (6" DOUBLE YELLOW SOLID AND LF 5,001
-9,000 $ 0.69 $ 0.73
BROKEN LINE) OVER 9,000 $ 0.57 $ 0.60
DETAIL 32 STRIPE
1-5,000 $ 0.89 $ 0.94

16.00 (6" DOUBLE YELLOW SOLID AND LF 5,001
-9,000 $ 0.79 $ 0.83
BROKEN LINE) WITH MARKER OVER 9,000 $ 0.68 $ 0.72
DETAIL 37B STRIPE
1-5,000 $ 0.63 $ 0.66
Exhibit "B" 2 of 7

17.00 (8" SINGLE WHITE BROKEN LINE WITH MARKER)
LF
5,001-9,000 $ 0.58 $ 0.61
LANE DROP AT INTERSECTION OVER 9,000 $ 0.53 $ 0.55
DETAIL 38 STRIPE
1-5,000 $ 0.63 $ 0.66

18.00 (8" SINGLE WHITE SOLID LINE) LF 5,001
-9,000 $ 0.58 $ 0.61
CHANNELIZING LINE WITH MARKER OVER 9,000 $ 0.53 $ 0.55
DETAIL 38A STRIPE
1-5,000 $ 0.53 $ 0.55

19.00 (8" SINGLE WHITE SOLID LINE) LF 5,001
-9,000 $ 0.47 $ 0.50
CHANNELIZING LINE OVER 9,000 $ 0.42 $ 0.44
DETAIL 38B STRIPE
1-5,000 $ 0.79 $ 0.83

20.00 (8" SINGLE WHITE SOLID LINE) LF 5,001
-9,000 $ 0.69 $ 0.73
CHANNELIZING LINE WITH DOUBLE MARKER OVER 9,000 $ 0.64 $ 0.67 DETAIL 39 STRIPE
1-5,000 $ 0.42 $ 0.44

21.00 (6" SINGLE WHITE SOLID LINE) LF 5,001
-9,000 $ 0.32 $ 0.33
BIKE LANE LINE OVER 9,000 $ 0.26 $ 0.28
DETAIL 39A STRIPE
1-5,000 $ 0.26 $ 0.28

22.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001
-9,000 $ 0.21 $ 0.22
INTERSECTION LIKE BAKE LANE OVER 9,000 $ 0.19 $ 0.20
DETAIL 40 STRIPE
1-5,000 $ 0.53 $ 0.55

23.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001
-9,000 $ 0.36 $ 0.37
LANE LINE EXTENSION THRU INTERSECTION OVER 9,000 $ 0.26 $ 0.28 DETAIL 41 STRIPE
1-5,000 $ 0.53 $ 0.55

24.00 (6" SINGLE YELLOW BROKEN LINE) LF 5,001
-9,000 $ 0.36 $ 0.37
CENTERLINE EXTENSION THRU INTERSECTION OVER 9,000 $ 0.26 $ 0.28

THERMOPLASTIC TRAFFIC STRIPE
DETAIL 1 STRIPE
1-5,000 $ 0.53 $ 0.55

25.00 (6" SINGLE YELLOW BROKEN LINE) LF 5,001-9000 $ 0.42 $ 0.44 CENTERLINE OVER 9,000 $ 0.37 $ 0.39
DETAIL 2 STRIPE
1-5,000 $ 0.58 $ 0.61

26.00 (6" SINGLE YELLOW BROKEN LINE) LF 5,001-9000 $ 0.53 $ 0.55 CENTERLINE OVER 9,000 $ 0.42 $ 0.44
DETAIL 8 STRIPE
1-5,000 $ 0.53 $ 0.55

27.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001-9000 $ 0.42 $ 0.44 LANE LINE OVER 9,000 $ 0.37 $ 0.39
DETAIL 9 STRIPE
1-5,000 $ 0.58 $ 0.61
Exhibit "B" 3 of 7

28.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001
-9,000 $ 0.53 $ 0.55
LANE LINE WITH MARKER OVER 9,000 $ 0.42 $ 0.44
DETAIL 12 STRIPE
1-5,000 $ 0.53 $ 0.55

29.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001
-9,000 $ 0.42 $ 0.44
LANE LINE OVER 9,000 $ 0.37 $ 0.39
DETAIL 12A STRIPE
1-5,000 $ 0.58 $ 0.61

30.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001
-9,000 $ 0.53 $ 0.55
LANE LINE WITH MARKER OVER 9,000 $ 0.42 $ 0.44
DETAIL 21 STRIPE
1-5,000 $ 1.37 $ 1.43

31.00 (6" DOUBLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 1.31 $ 1.38
NO PASSING ZONE OVER 9,000 $ 1.26 $ 1.32
DETAIL 22 STRIPE
1-5,000 $ 1.52 $ 1.60

32.00 (6" DOUBLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 1.42 $ 1.49
NO PASSING ZONE WITH MARKER OVER 9,000 $ 1.37 $ 1.43
DETAIL 24 STRIPE
1-5,000 $ 0.95 $ 0.99

33.00 (6" SINGLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 0.82 $ 0.86
LEFT EDGE LINE OVER 9,000 $ 0.68 $ 0.72
DETAIL 25A STRIPE
1-5,000 $ 1.00 $ 1.05

34.00 (6" SINGLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 0.87 $ 0.92
LEFT EDGE LINE WITH MARKER OVER 9,000 $ 0.74 $ 0.77
DETAIL 27B STRIPE
1-5,000 $ 0.95 $ 0.99

35.00 (6" SINGLE WHITE SOLID LINE) LF 5,001
-9,000 $ 0.82 $ 0.86
RIGHT EDGE LINE OVER 9,000 $ 0.68 $ 0.72
DETAIL 27C STRIPE
1-5,000 $ 0.84 $ 0.88

36.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001
-9,000 $ 0.68 $ 0.72
EXTENSION THRU INTERSECTION OVER 9,000 $ 0.58 $ 0.61
DETAIL 28 STRIPE
1-5,000 $ 2.47 $ 2.59

37.00 (6" DOUBLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 2.36 $ 2.48
MEDIAN ISLAND OVER 9,000 $ 2.26 $ 2.37
DETAIL 29 STRIPE
1-5,000 $ 2.78 $ 2.92

38.00 (6" DOUBLE YELLOW SOLID LINE) LF 5,001
-9,000 $ 2.68 $ 2.81
MEDIAN ISLAND WITH MARKER OVER 9,000 $ 2.57 $ 2.70
DETAIL 31 STRIPE
1-5,000 $ 2.15 $ 2.26

39.00 (6" DOUBLE YELLOW SOLID AND LF 5,001
-9,000 $ 2.05 $ 2.15
BROKEN LINE) OVER 9,000 $ 1.89 $ 1.98
Exhibit "B" 4 of 7
DETAIL 32 STRIPE 1-5,000 $ 2.36 $ 2.48

40.00 (6" DOUBLE YELLOW SOLID AND LF 5,001-9,000 $ 2.26 $ 2.37 BROKEN LINE) WITH MARKER OVER 9,000 $ 2.15 $ 2.26
DETAIL 37B STRIPE 1-5,000 $ 1.10 $ 1.16

41.00 (8" SINGLE WHITE BROKEN LINE WITH MARKER)
LF
5,001-9,000 $ 1.00 $ 1.05
LANE DROP AT INTERSECTION OVER 9,000 $ 0.95 $ 0.99
DETAIL 38 STRIPE 1-5,000 $ 1.47 $ 1.54

42.00 (8" SINGLE WHITE SOLID LINE) LF 5,001-9,000 $ 1.31 $ 1.38 CHANNELIZING LINE WITH MARKER OVER 9,000 $ 1.19 $ 1.25
DETAIL 38A STRIPE 1-5,000 $ 1.37 $ 1.43

43.00 (8" SINGLE WHITE SOLID LINE) LF 5,001-9,000 $ 1.16 $ 1.21 CHANNELIZING LINE OVER 9,000 $ 1.00 $ 1.05
DETAIL 38B STRIPE 1-5,000 $ 1.58 $ 1.65

44.00 (8" SINGLE WHITE SOLID LINE) LF 5,001-9,000 $ 1.42 $ 1.49 CHANNELIZING LINE WITH DOUBLE MARKER OVER 9,000 $ 1.31 $ 1.38 DETAIL 39 STRIPE 1-5,000 $ 0.97 $ 1.01

45.00 (6" SINGLE WHITE SOLID LINE) LF 5,001-9,000 $ 0.84 $ 0.88 BIKE LANE LINE OVER 9,000 $ 0.74 $ 0.77
DETAIL 39A STRIPE 1-5,000 $ 0.84 $ 0.88

46.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001-9,000 $ 0.74 $ 0.77 INTERSECTION LIKE BAKE LANE OVER 9,000 $ 0.61 $ 0.64
DETAIL 40 STRIPE 1-5,000 $ 0.88 $ 0.93

47.00 (6" SINGLE WHITE BROKEN LINE) LF 5,001-9,000 $ 0.64 $ 0.67 LANE LINE EXTENSION THRU INTERSECTION OVER 9,000 $ 0.57 $ 0.60 DETAIL 41 STRIPE 1-5,000 $ 0.88 $ 0.93

48.00 (6" SINGLE YELLOW BROKEN LINE) LF 5,001-9,000 $ 0.64 $ 0.67 CENTERLINE EXTENSION THRU INTERSECTION OVER 9,000 $ 0.57 $ 0.60 PAINT PAVEMENT MARKING (2-COAT)
1-5,000 $ 3.15 $ 3.31

49.00 PAVEMENT MARKING: TRANSVERSE MARKING SUCH AS (1) LIMIT LINE, STOP LINE, AND YIELD LINES, (2) CROSSWALK, (3) WORD,

ARROW, LEGEND OR SYMBOL, NUMERAL, SHOULDER, PARKING

STALL, OR RAILROAD-GRADE-CROSSING MARKING
SQFT 5,001-9,000
$ 2.94 $ 3.09
Exhibit "B" 5 of 7
OVER 9,000 $ 2.89 $ 3.03

THERMOPLASTIC PAVEMENT MARKING
1-5,000 $ 5.78 $ 6.06

50.00 PAVEMENT MARKING: TRANSVERSE MARKING SUCH AS (1) LIMIT LINE, STOP LINE, AND YIELD LINES, (2) CROSSWALK, (3) WORD,

ARROW, LEGEND OR SYMBOL, NUMERAL, SHOULDER, PARKING

STALL, OR RAILROAD-GRADE-CROSSING MARKING
SQFT 5,001-9,000
$ 5.25 $ 5.51
OVER 9,000 $ 4.99 $ 5.24

MISCELLANEOUS
PAINT PARKING STALL STRIPE 1-5,000 $ 1.05 $ 1.10

51.00 (3" DOUBLE WHITE SOLID) LF 5,001-9,000 $ 0.95 $ 0.99

PER CITY PARKING REGULATIONS AND STANDARDS
OVER 9,000 $ 0.84 $ 0.88
PAINT HANDICAPPED BLUE LINE 1-5,000 $ 1.31 $ 1.38

52.00 BORDER LF 5,001-9,000 $ 1.16 $ 1.21
(4" SOLID BLUE LINE) OVER 9,000 $ 1.00 $ 1.05
INSTALL ADA SYMBOL (ISA) 1-5,000 $ 63.00 $ 66.15

53.00 PAVEMENT MARKING EA 5,001-9,000 $ 57.75 $ 60.64
OVER 9,000 $ 42.00 $ 44.10
CURB PAINT 1-5,000 $ 1.84 $ 1.93

54.00 (RED, BLUE, GREEN, YELLOW, GRAY, LF 5,001-9,000 $ 1.68 $ 1.76 OR WHITE) OVER 9,000 $ 1.58 $ 1.65
RAISED PAVEMENT MARKER 1-5,000 $ 4.20 $ 4.41

55.00 (RETRO-REFLECTIVE) EA 5,001-9,000 $ 3.78 $ 3.97
OVER 9,000 $ 3.41 $ 3.58
RAISED PAVEMENT MARKER 1-5,000 $ 3.15 $ 3.31

56.00 (NON-REFLECTIVE) EA 5,001-9,000 $ 2.89 $ 3.03
OVER 9,000 $ 2.73 $ 2.87
1-5,000 $ 1.84 $ 1.93

57.00 REMOVE PAVEMENT MARKER EA 5,001-9,000 $ 1.26 $ 1.32 OVER 9,000 $ 1.05 $ 1.10
1-5,000 $ 2.36 $ 2.48

58.00 REMOVE TRAFFIC STRIPE (GRIND) LF 5,001-9,000 $ 1.97 $ 2.07 OVER 9,000 $ 1.50 $ 1.58
Exhibit "B" 6 of 7
1-5,000 $ 3.83 $ 4.02

59.00 REMOVE PAVEMENT MARKING (GRIND) SQFT 5,001-9,000 $ 3.41 $ 3.58 OVER 9,000 $ 2.78 $ 2.92
REMOVE AND DISPOSE YELLOW 1-5,000 $ 4.20 $ 4.41

60.00 THERMOPLASTIC PAVEMENT LF 5,001-9,000 $ 3.68 $ 3.86 STRIPE OVER 9,000 $ 3.15 $ 3.31
REMOVE AND DISPOSE YELLOW 1-5,000 $ 5.25 $ 5.51

61.00 THERMOPLASTIC PAVEMENT SQFT 5,001-9,000 $ 4.83 $ 5.07 MARKING OVER 9,000 $ 4.20 $ 4.41
GREEN COLORED 1-5,000 $ 11.03 $ 11.58

62.00 PAVEMENT THERMOPLASTIC SQFT 5,001-9,000 $ 9.98 $ 10.47 MARKING OVER 9,000 $ 9.45 $ 9.92
GREEN COLORED 1-5,000 $ 5.25 $ 5.51

63.00 PAVEMENT PAINT SQFT 5,001-9,000 $ 4.73 $ 4.96
MARKING OVER 9,000 $ 4.20 $ 4.41

64.00 MOBILIZATION
EA 1.00 $
1,575.00 $ 1,653.75
Company: Contractor:
____________________________ HS&S
By:_________________________ _Nick Harker_________________ Date:_______________________ _____________________________ Exhibit "B" 7 of 7

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Jennifer M. Byers, Economic & Community Development Director DATE: July 9, 2025
SUBJECT: Amendment No. 1 to Agreement No. 2025-073 with Niles RAD, LP (removing non-applicable federal regulatory language from the loan agreement) for loan agreement to assist developer with the cost of construction new affordable housing units within the Niles Street Apartments multifamily housing development located at 7410 Niles Street. (Ward 3)
RECOMMENDATION:

Staff recommends approval of the amendment.

BACKGROUND:

On May 28, 2025, the City of Bakersfield and Niles RAD, LP (“Developer”) entered into Agreement No. 2025-073 to assist the Developer with the cost of construction of 51 new affordable housing units located at 7410 Niles Street, Bakersfield, California 93306 (“Project”).

Pursuant to the terms of Agreement No. 2025-073, the City agreed to loan the Developer a total of $1,399,260 in FY 2024-25 HOME Investment Partnership grant funding for the construction of new affordable rental housing.

This amendment is requesting the following updates:

1.) Removal of non-applicable language regarding Build America, Buy America provisions from the Developer’s Obligations section.

2.) Removal of language regarding Investor Tax Credit equity and compliance periods from the Assignment of the Agreement.

3.) Revision of the construction schedule in Exhibit B.

FISCAL IMPACT:

No fiscal impact. HOME Investment Partnerships grant funding was allocated to Niles RAD, LP on January 22, 2025, as part of the FY 2024-25 Substantial Action Plan No. 3. The Amendment is not requesting additional resources than previously approved.

COUNCIL GOAL:

Safety and Resilience
WARD: 3
ATTACHMENT:

Amendment

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Jennifer M. Byers, Economic & Community Development Director DATE: July 9, 2025
SUBJECT: Amendment No. 1 to Agreement No. 2024-121 with Renaissance at Baker LP (to include language requested by California Department of Housing & Community Development (HCD)) for grant funding to be used for the development of extremely low to low-income affordable housing rental projects. (Ward 2) RECOMMENDATION:

Staff recommends approval of the amendment.

BACKGROUND:

On May 22, 2024, the City of Bakersfield and Renaissance at Baker LP (Developer) entered into Agreement No. 2024-121 to assist with the cost of construction of 85 new affordable housing units located at 1001 Baker Street, Bakersfield, California 93301.

Pursuant to the terms of Agreement No. 2024-121, the City agreed to loan the Developer a total award of $2,056,205 from California Department of Housing and Community Development Local Housing Trust Fund (LHTF), with the required match from local Public Safety Vital Services (PSVS) funding as part of the City’s Affordable Housing Trust Fund (AHTF), as shown below:
 LHTF $1,028,102.50
 PSVS $1,028,102.50
On March 19, 2025, HCD requested the Agreement clearly identify the LHTF funding source and the required City matching funds source. At this time, staff is requesting an amendment to Agreement No. 2024-121 to clarify the two (2) distinct funding sources between LHTF and the City’s PSVS matching funds. The Scope of Project (Exhibit B) has been updated as requested by HCD with the specific sources of funds.

FISCAL IMPACT:

No fiscal impact. PSVS resources were allocated as part of the FY 2021-22 budget and included in the City’s Affordable Housing Trust Fund 2022 Notice of Funding Availability. The Amendment is not requesting additional resources than previously approved.

COUNCIL GOAL:

Safety and Resilience
WARD: 2
ATTACHMENT:

Amendment

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: July 11, 2025
SUBJECT: Amendment No. 2 to Agreement No. 2023-192 with Centennial Asphalt Company (extend term by one year) to continue the supply of asphaltic emulsions and sealant for the Streets Division.

RECOMMENDATION:

Staff recommend approval of the amendment.

BACKGROUND:

On August 9, 2023, the City Council approved the annual contract for the asphaltic emulsions and sealants for the Streets Division to Centennial Asphalt Company, in the amount of $563,982.50; renewable annually thereafter for four consecutive one-year periods.

Per the terms of the contract, one amendment increasing the contract and/or extending the contract has been approved as follows:
 Amendment 1 approved July 24, 2024; extended term date by one year.

The Streets Division uses asphalt emulsions (tack oil) when paving and patching City streets. This bonding agent is sprayed on asphalt surfaces prior to application of new material to adhere the new asphalt to the original surface. Topein C emulsion mixture is used to allow slow setting of asphalt emulsions to seal pavement and inhibit raveling. Asphalt sealants are used for preventative maintenance to provide protection from the environment, such as ultraviolet rays and moisture intrusion.

If approved, Amendment No. 2 will extend the contract by one year, allowing the continued supply of asphaltic emulsions and sealant for the Streets Division. No additional funding is required.

FISCAL IMPACT:

The funding source for this contract 90% Grant and 10% City match. The Grant is from Transportation Development Act Article 4 Public Transportation funds which are administered by the Kern Council of Governments, the remain City fund is General Fund grant match funds.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

Partially signed Amendment No. 2

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: July 11, 2025
SUBJECT: Amendment No. 3 to Agreement No. 2023-194 with Kern Masonry Structures, Inc. (increase compensation by $200,000; revised not to exceed $1,400,000 and extend the term by one year) to continue block wall repair.

RECOMMENDATION:

Staff recommend approval of the amendment.

BACKGROUND:

On August 9, 2023, the City Council approved the Annual Contract for block wall repair. with Kern Masonry Structures, Inc., in the amount of $400,000; renewable annually thereafter for four consecutive one-year periods.

Per the terms of the contract, two amendments increasing the contract and/or extending the contract has been approved as follows:
• Amendment 1 approved May 8, 2024; increased compensation by $200,000 for a revised not to exceed amount of $600,000.
• Amendment 2 approved July 24, 2024; increased compensation by $600,00 for a revised not to exceed amount of $1,200,000 and extended the term by one year to August 9, 2025.

This on-call as-needed contract provides for block wall repair of City owned masonry walls within landscape streetscapes throughout the City. The Recreation and Parks Department is responsible for maintenance and repair of block walls typically damaged by traffic accidents.

If approved, Amendment No. 3 will increase compensation by $200,000 for a revised not to exceed amount of $1,400,000 to allow the continuance of block wall repair services to the term date of August 9, 2026.

FISCAL IMPACT:

Funds are budgeted in the Recreation and Parks operating budget for the work performed under this contract.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

Amendment No.3

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Consent -Agreements TO: Honorable Mayor and City Council
FROM: Zachary Meyer, Public Works Director
DATE: June 27, 2025
SUBJECT: Contract Change Order No. 2 to Agreement No. 2024-188 with Total Western Inc. ($241,270.00 revised not to exceed $1,749,865.00) for the Strom Drain Improvements: Within Existing Tract 5416 (Sundance Way. Bold Venture Court, and Mohican Drive) (Ward 4)
RECOMMENDATION:

Staff recommends approval of the change order.

BACKGROUND:

The work to be performed consists, in general, of installing approximately 122 linear feet (LF) of 30 inch diameter reinforced concrete pipe (RCP), approximately 82 LF of 24 inch diameter RCP, and approximately 1,190 LF of 18 inch diameter RCP; demolishing and reconstructing one catch basin and one outlet structure; constructing two junction boxes and five 48 inch manholes; and reshaping the existing drainage basin; and installing rock slope protection.

To construct the project according to the plans and specifications, several contract item quantities had to be either increased or decreased. This is the final contract change order for this project to adjust and balance all quantities according to the final measurements. This change order resultsin a net cost increase of $241,270.00.

FISCAL IMPACT:

Project E2K310 is funded through Sewer Enterprise Funds. Therefore, there is no impact to the General Fund.

The Total cost increase for Contract Change Order No. 2 is $241,270.00. This is the second and final change order on the project and reflects a total project cost increase of $259,876.00 (17.4 percent increase of the original contract amount) as illustrated below.

Original Contract Amount = $ 1,489,989.00
Total of Previous Change order
approved by council
= $ 18,606.00
Current Contract change order = $ 241,270.00
Amended Contract Amount
after Change Orders
= $ 1,749,865.00
Net Increase to Date = $ 259,876.00
COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

Contract Change Order No 2 for Storm Drain Improvements within tract 5416

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Consent - Miscellaneous TO: Honorable Mayor and City Council
FROM: Darin Budak, Recreation and Parks Director
DATE: July 7, 2025
SUBJECT: Appropriate $25,140 Park Improvement Fund balance from Southwest Developer Reimbursement – Zone 1
for the reimbursement to Sierra Oak Partners, LLC for their completion of Belcourt Park (Ward 5)
RECOMMENDATION:

Staff recommends approval of the appropriation.

BACKGROUND:

Belcourt Park (Park) is located at 3801 Windermere Street. On March 25, 2015, City Council approved Agreement 15-070 between City and Sierra Oaks Partners, LLC. (Subdivider), outlining the development of an 8.2-acre park. On March 30, 2016, the City and Subdivider agreed to amend the original agreement with Agreement 15-070(1). The Amendment provided the Subdivider with more time to construct, as well as establish Subdivider’s Park development deposits. The Park was completed and opened to the public on November 1, 2019.

The Subdivider submitted information outlining the total cost that was incurred for the design, engineering, and construction of Belcourt Park in the amount of $2,181,907.71. The City refunded the Subdivider in September 25, 2019 the initial deposit of $392,000.00 plus the park development deposits totaling $571,480.00 through August 30, 2019. Since the initial reimbursement, the City has made the following installments per the Agreement:
• Second installment in the amount of $189,800.00 was paid on June 11,2020. • Third installment in the amount of $89,930.00 was paid on November 19, 2020. • Fourth installment in the amount of $60,755.00 was paid on October 28, 2021.  Fifth installment in the amount of $73,325.00 was paid on June 30, 2022.  Sixth installment in the amount of $175,980.00 was paid on November 16, 2023.  Seventh installment in the amount of $77,515.00 was paid on May 8, 2024.  Eight installment in the amount of $167,595.00 was paid on March 26, 2025.

The City has a contractual obligation remaining of $775,527.71 or the actual amount collected of park development deposits from the Zone of Benefits as listed in the Agreements, not greater than the actual cost to construct the park. From March 1, 2025 through June 30, 2025, $25,140 in park development deposits have been collected in the Zone of Benefit. The Subdivider has requested reimbursement for the stated period. Once this ninth request has been paid, the maximum future obligation that remains is $750,387.71 or the actual amount collected in the Zone of Benefit.

FISCAL IMPACT:

The Belcourt Park developer reimbursement obligation is funded through Park Improvement Fees Southwest Developer Reimbursement – Zone 1, there is no impact to the General Fund COUNCIL GOAL:

Community Character & Quality of Life
ATTACHMENTS:

1. AGRMT NO 15-070

2. AGRMT NO 15-070()

3. Park Fees Paid Report Tract 7376_06.30.2025
RECORDING REQUESTED BY:

City of Bakersfield
When recorded, mail to:

VIRGINIA GENNARO
City Attorney

CITY ATTORNEY' S OFFICE
1600 Truxtun Avenue, 4th Floor
Bakersfield, California 93301
No Fee for Recording in Accordance
With Section 27383 of the
California Government Code
Recorded For The Benefit of the Above Party

DOCUMENT

ELECTRONICALLY

RECORDED IN THE

OFFICIAL RECORDS
Space above this line for Recorder' s use
15 - 070

AGREEMENT FOR ACQUISITION AND DEVELOPMENT

OF BELCOURT AT SEVEN OAKS PARK LOACTED AT

CAMPUS PARK DRIVE AND WINDEMERE STREET
T,
ORIGINAli
RECORDING REQUESTED BY:

City of Bakersfield
When recorded, mail to:

VIRGINIA GENNARO
City Attorney

CITY ATTORNEY' S OFFICE
1600 Truxtun Avenue, 4th Floor
Bakersfield, California 93301
No Fee for Recording in Accordance
With Section 27383 of the
California Government Code
Recorded For The Benefit of the Above Party
Jon Lifquist, Assessor - Recorder sM
Kern County Official Records 3/ 3112015
02: 00 PM
Recorded Electronically by:
017 City of Bakersfield City Clerk
Doc #: 000215037457 Stat Types: 1 Pages: 29
FEES 00
TAXES 00
OTHER 00
000215037457 PAID 00
Space above this line for Recorder' s use
15 - 070

AGREEMENT FOR ACQUISITION AND DEVELOPMENT

OF BELCOURT AT SEVEN OAKS PARK LOACTED AT

CAMPUS PARK DRIVE AND WINDEMERE STREET
Acquisition, Dedication &Development Agreement
WoodbridgeAcgDevW Ming- F. Iger.20141 118.05
o`` gAKF9
90 AGREEMENT NO. 1 5 - 0 7 0

AGREEMENT FOR ACQUISITION AND DEVELOPMENT

OF BELCOURT AT SEVEN OAKS PARK LOCATED AT

CAMPUS PARK DRIVE AND WINDERMERE STREET
THIS AGREEMENT is made and entered into on MAR 2 5 2015 , by and between the CITY OF BAKERSFIELD, a municipal corporation ( "CITY" herein), and SIERRA OAKS PARTNERS LLC, a Delaware limited liability company, ( "SUBDIVIDER" herein).

RECITALS
WHEREAS, on August 15, 2007, the City Council adopted Resolution Numbers 161 -07, 162 -07, 163 -07, and 164 -07 thereby approving a 2, 182 acre project generally bounded by Buena Vista Road, White Lane, Allen Road, and the Union Pacific Railroad commonly referred to as the West Ming Project ( "West Ming "); and
WHEREAS, by Resolution Number 163 -07 referenced above, the City Council approved the West Ming Specific Plan (the " Specific Plan "); and WHEREAS, the current Specific Plan for West Ming includes six separate residential villages identified as Villages " A" through " F," a Village Center District and a Special Use District, and provides for various parks to be located within the Villages and Village Center District; and
WHEREAS, SUBDIVIDER is first developing Village " F" in West Ming, which has a requirement to develop and dedicate a public park; and WHEREAS, it is the intent of parties to set forth all covenants and conditions for SUBDIVIDER' s development and dedication to CITY of an 8.20 gross acre public park within Village " F" and referred to in this Agreement as " Park." See Exhibit "A" legal description of Park) and Exhibit " B" ( map of Park) attached hereto; and WHEREAS, pursuant to the terms and conditions of this Agreement, SUBDIVIDER will construct Park in substantial compliance with the plans and specifications described in Exhibit " C" attached hereto, dedicate said Park to CITY as a public park, and provide for the private maintenance of Park by the applicable homeowners association; and
Acquisition, Dedication &Development Agreement
WoodbridgeAcgDevW Ming- F. Iger.20141 118.05

Page 1 of 17 ends

o``
0 AKF9cr>
m
1RIt', INAL
WHEREAS, performance under this Agreement will satisfy all of SUBDIVIDER' s parkland dedication requirements and park development and improvement requirements for Village F, including all requirements under chapters 15. 80 and

15.82 of the Bakersfield Municipal Code and Section 9. 1 of the Specific Plan, including implementation measures P - 1 through P -6, inclusive as identified in the Specific Plan; and
WHEREAS, the City of Bakersfield Planning Director has made a finding that this Agreement and the acquisition contemplated in this Agreement are consistent with the Specific Plan and the Metropolitan Bakersfield General Plan; and
WHEREAS, the transfer of the ownership interests of Park for park purposes is categorically exempt from CEQA under CEQA Guidelines Section 15325, Class 25, and the development of Park site is categorically exempt from CEQA under Sections 15303, Class 3 and 15304, Class 4.

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and SUBDIVIDER mutually agree to dedicate, develop, and provide for the maintenance of a public park as follows:

I.

DEVELOPMENT

1. PARK IMPROVEMENTS. SUBDIVIDER shall construct Park in the time and manner specified herein.

2. MANNER OF CONSTRUCTION. All improvements for Park shall be installed and constructed in conformity with all legal requirements and industry standards observed by a competent practitioner of the profession in California and in accordance with all of the following (the " Park Improvements "):

2. 1 Consistent with the quality of amenities used in City parks;

2.2 The CITY - approved Park Improvement plans and specifications described in Exhibit " C ", which the parties acknowledge comply with all adopted CITY standards; and

2.3 Good engineering practices and workmanlike manner.

3. TIME OF CONSTRUCTION. SUBDIVIDER shall begin construction of Park prior to the issuance of any building permit for Village F except for permits required for the construction of Park and /or permits issued for the construction of model homes. SUBDIVIDER shall complete construction of Park by March 1, 2106, unless Acquisition, Dedication & Development Agreement
Woodb6dgeAcgDevWMing- F. Iger.20141118.05

Page 2 of 17 ends

m
g Al4
an extension of time is granted by CITY in writing and approved by City Council.

If Park is not completed by March 1, 2016, no further building permits will be issued for Village F until Park is completed.

4. INSPECTION AND APPROVAL OF IMPROVEMENTS. CITY shall cause to be recorded a Notice of Completion and Acceptance for Park upon the occurrence of all of the following:

4. 1 Completion of Park Improvements. When the Park
Improvements have been satisfactorily completed, and upon written application of the SUBDIVIDER, the City Engineer shall inspect and approve the same within a reasonable time and shall file a certificate showing the date of inspection and approval and shall make an order accepting or approving the Park Improvements.

5. WARRANTY AGAINST DEFECTS. SUBDIVIDER shall, for a period of one 1) year following acceptance by CITY, warrant all features of the Park Improvements, including plant material, against defective work or labor done, or defective material furnished, in the performance of this Agreement; and SUBDIVIDER agrees to correct, repair or replace promptly when demanded by CITY, all such defective work or labor done, or defective materials furnished.

II.

REFUND OF DEPOSIT / NO PARK DEVELOPMENT FEES COLLECTED /

SATISFACTION OF PARK REQUIREMENTS / NO CITY LIABILITY

6. Refund to Subdivider. The only monies SUBDIVIDER will receive from the CITY for the development of Park shall be the refund of the sum of Three Hundred Ninety -Two Thousand Two Hundred Twenty Four Dollars ($ 392, 224.00) which SUBDIVIDER previously deposited with the CITY as security for park land development in connection with the Park Square at Seven Oaks apartment project. CITY will refund said monies to SUBDIVIDER upon satisfactory completion of construction of the Park Improvements.

7. No Park Development Fees Collected From Zone of Benefit. No park development fees as called for in chapters 15. 80 and 15.82 of the Bakersfield Municipal Code will be due, owing, or collected from the Zone of Benefit of the Park, as shown on Exhibit " D" attached hereto and incorporated by reference herein.

8. Satisfaction of Park Development and Improvement Reauirements.

SUBDIVIDER' s completion of the Park Improvements, and dedication of the Park, as contemplated in this Agreement, shall satisfy all park development and Acquisition, Dedication & Development Agreement
Woodbr dgeAcgDevWMing- F. Iger.20141 118. 05

Page 3 of 17 ends

gAK r
U

ORIGINAL
improvement requirements for the full build -out of Village F as contemplated in the Specific Plan, including all requirements under chapter 15.82 of the Bakersfield Municipal Code, all requirements under Section 9. 1 of the Specific Plan, including implementation measures P - 1 through P -6, inclusive, thereof, and any conditions of approval requiring park development and /or payment of park development fees.

9. No City Liability. CITY shall have no liability for failure to collect any park development fees specified herein, and CITY does not pledge itself that any such monies will be collected. SUBDIVIDER acknowledges and agrees that CITY will not collect park development fees from the Zone of Benefit, and accordingly no such fees will be available to reimburse SUBDIVIDER for or in connection with the development of the Park.

III.

MAINTENANCE

10. MAINTENANCE RESPONSIBILITY. The Seven Oaks West Master Homeowners Association, a California non - profit mutual benefit corporation SOWMHA "), under a separate license agreement entered into between SOWMHA and CITY of even date herewith, has agreed to maintain and repair, or provide for the maintenance and repair, at no cost to the CITY, of all walls, streetscape and median landscaping, roundabout landscaping, irrigation, park amenities and playground equipment in certain public areas of Village " F" including the Park at a level at least consistent with the standard of maintenance within the City' s Consolidated Maintenance District, and has agreed to observe and comply with all applicable safety measures as required by CITY, all as more particularly set forth in the aforementioned license agreement.

10. 1 Remedies and Repairs. SUBDIVIDER shall repair all problems brought to its attention in writing by CITY, within thirty ( 30) days if such problems can reasonably be repaired within such time, or if such problems cannot reasonably be repaired within such time, SUBDIVIDER shall commence such repair within thirty ( 30) days, and shall diligently continue in efforts to complete such repair, without cessation, until such repair is completed. If SUBDIVIDER fails to make appropriate repairs within the time frames specified above, CITY retains the right to make such repairs and submit an invoice to SUBDIVIDER for the cost of such repairs or seek other appropriate remedies.

10.2 Assignment to Homeowners Association or Maintenance District. SUBDIVIDER shall have the right to assign some or all of its rights and /or obligations under this Agreement, including its obligations under Section 10. 1 above to SOWMHA, a sub - homeowners association or maintenance district, as Acquisition, Dedication &Development Agreement
WoodbridgeAcgDevW Ming- F. Iger.20141 118. 05

Page 4 of 17 ends

O
0AK,6
9J'
o

ORIGINAL
contemplated in Section 9. 1, including Implementation Measure P -5, of the Specific Plan. Any such assignment shall be by a written agreement signed by SUBDIVIDER and the applicable homeowners association or maintenance district by which SUBDIVIDER assigns to the assignee, and the assignee accepts and assumes the assigned rights and /or obligations. Effective upon SUBDIVIDER' s delivery to the CITY of a true and correct copy of such assignment and assumption agreement, SUBDIVIDER shall be released from the obligations assigned thereunder, and the assignee shall be substituted as the obligor therefor in place and stead of SUBDIVIDER.

IV.

CONVEYANCE

11. AGREEMENT TO DEDICATE.

11. 1 Dedication of Park Property. SUBDIVIDER shall dedicate or cause to be dedicated, the Park property to CITY in accordance with the covenants and conditions set forth in this Agreement.

11. 2 Satisfaction of Parkland Dedication Requirements. Dedication of the Park by SUBDIVIDER, as contemplated in this Agreement, shall satisfy all parkland dedication requirements for the full build -out of Village F as contemplated in the Specific Plan, including all requirements under chapter 15.80 of the Bakersfield Municipal Code, all requirements under Section 9. 1 of the Specific Plan, including implementation measures P - 1 through P -6, inclusive, thereof, and any conditions of approval requiring parkland dedication.

11. 3 Dedication to Occur Followina Notice of Completion.

Dedication of Park by SUBDIVIDER to CITY under this Agreement shall occur no earlier than the recordation of the Notice of Completion for the Park Improvements.

12. CONVEYANCE OF TITLE. SUBDIVIDER agrees to convey to CITY fee simple marketable title to Park free and clear of all recorded and unrecorded liens, encumbrances, assessments, easements, leases, contracts and taxes, excepting those agreed to in writing by CITY. Any and all water rights accruing to Park real property shall also be transferred to CITY without reservation, provided that the grantor(s) shall have the right to reserve any water rights reserved to Bolthouse Properties, LLC ( " BOLTHOUSE "), its successors or assigns, under that certain Land Exchange and Water Development Agreement dated June 7, 2006 by and between BOLTHOUSE, Castle & Cooke California, Inc., the Kern County Water Agency and CITY, including the right to pump or take groundwater from the Park property for development purposes or amenities pursuant to Section 3.4 Acquisition, Dedication &Development Agreement
WoodbidgeAcgDevWMing- F. Iger.20141118.05

Page 5 of 17 ends

v
ORIGINAL.
of said agreement. SUBDIVIDER also agrees to provide evidence to CITY that waivers of surface entry have been recorded with respect to the fee oil, gas and mineral estate owned by third parties in and to the Park property. Within thirty (30) days of recordation of the Notice of Completion, SUBDIVIDER shall execute a Grant Deed which conveys fee simple title to the property to CITY and shall deliver same to Escrow Holder.

13. ESCROW.

13. 1 Escrow Holder. The conveyance of the Park property shall be consummated by means of an escrow to be opened at the office of Ticor Title Company, located at 10000 Stockdale Highway, Suite 101, Bakersfield, CA 93311 herein " Escrow Holder ").

13.2 Real Property. SUBDIVIDER shall grant Park to CITY, in fee simple, and in the manner set forth herein.

13.3 Escrow Instructions. Within twenty ( 20) working days of the recordation of the Notice of Completion, each party shall deliver to Escrow Holder appropriately executed escrow instructions or file a written protest detailing what instructions are not acceptable. This Agreement shall serve as the parties' instructions to the Escrow Holder and shall become part of the escrow instructions for consummation of the conveyance of the property. SUBDIVIDER and CITY agree to execute such additional and supplementary instructions as may be appropriate or required by Escrow Holder to comply with the terms of this Agreement; provided, however, that in the event of any conflict between this Agreement and any additional or supplementary escrow instructions, the terms of this Agreement shall control, unless the parties jointly agree to the contrary.

Said escrow instructions are incorporated herein by this reference.

13.4 Closing Costs. SUBDIVIDER shall be responsible for normal escrow fees, including the cost of title insurance which vests title to Park real property in the CITY. SUBDIVIDER shall be responsible for all other closing costs, including, but not limited to, all real property taxes and assessments accruing up to the close of escrow. SUBDIVIDER shall fully pay the full amount of any bond or assessment which is a lien upon the property.

14. PRELIMINARY TITLE REPORT AND DOCUMENTS. Within ten ( 10) working days following the execution of this Agreement, the following shall occur:

14. 1 Preliminary Title Report. SUBDIVIDER shall obtain a preliminary title report ( herein " PTR ") concerning the property, together with copies of reproducible documents referred to in such PTR, if any.

Acquisition, Dedication &Development Agreement
WoodbddgeAcgDevWMing- F. Iger.20141118.05

Page 6 of 17 ends

o
AK
9s
ORIGIN4;

14.2 Title Documents. SUBDIVIDER shall provide CITY copies of all currently effective unrecorded tenant leases, licenses or other agreements relating to the property.

14.3 City Approval /Disapproval of Title Exceptions. CITY shall deliver to Escrow Holder its written approval or disapproval of any exceptions to the title referred to above within ten ( 10) working days after CITY' s receipt thereof. If, after receipt of disapproval of any exceptions to the title, SUBDIVIDER does not elect to cure all of said exceptions, then CITY shall have the right either to accept title to the property subject to said exceptions, thereby waiving any and all claims against SUBDIVIDER by reason thereof, or to terminate this Agreement. CITY shall give SUBDIVIDER such written notice of CITY' s election within the ten ( 10) working days after receipt of SUBDIVIDER' s election not to cure. If CITY elects to terminate this Agreement, thereafter neither SUBDIVIDER nor CITY shall have any further liability hereunder, except that CITY shall be entitled to the prompt return of all funds deposited by CITY with Escrow Holder, less reasonable escrow cancellation fees and costs and title company charges which CITY hereby agrees to pay.

15. CLOSING DATE. Escrow shall close within 60 calendar days after the recordation of the Notice of Completion for the Park Improvements.

16. CONTINGENCIES. The closing of this transaction is contingent upon the satisfaction or waiver of the following contingencies:

16. 1 Site Assessment. A favorable environmental site assessment to be performed by CITY.

16.2 Condition of Title. CITY' s written approval of a current PTR concerning the property issued by the Title Company, as well as all documents referred to in the PTR or this Agreement (the " Underlying Documents "), and the issuance by the Title Company of the title policy. SUBDIVIDER shall cause the PTR and all Underlying Documents to be delivered to CITY promptly after the date of Agreement. CITY' s approval is to be given within ten ( 10) days after receipt of said PTR and legible copies of all Underlying Documents. The disapproval by CITY of any monetary encumbrance, which by the terms of the Agreement is not to remain against the property after the Closing, shall not be considered a failure of this condition, as SUBDIVIDER shall have the obligation, at SUBDIVIDER' s expense, to satisfy and remove such disapproved monetary encumbrance at or before the Closing.

16.3 Existina Leases and Tenancy Statements. CITY' s written approval, within ten ( 10) days after receipt of legible copies of all leases, Acquisition, Dedication & Development Agreement
Woodbr dgeAcgDevWMing- F. Iger.20141118.05

Page 7 of 17 ends

gAKF$
P
r

ORIGINN,
subleases or rental arrangements (collectively the " Existing Leases ") affecting the property.

16.4 Other Agreements. CITY' s written approval, within ten ( 10) days after receipt, of a copy of any other agreements ( "Other Agreements ") known to SUBDIVIDER that will affect the property beyond the Closing. CITY shall cause said copies to be delivered to SUBDIVIDER promptly after the Date of Agreement.

These agreements shall be part of the Underlying Documents.

16. 5 Material Chance. No material change shall have occurred with respect to the property that has not been approved in writing by CITY, which shall have twenty (20) days following receipt of written notice from any source of any such Material Change within which to approve or disapprove same. Unless otherwise notified in writing by either party, Escrow Holder shall assume that no Material Change has occurred prior to close of escrow.

16. 6 All above contingencies are for the benefit of, and may be waived in writing by, CITY and may be elsewhere herein referred to as " CITY Contingencies."
V.

MISCELLANEOUS

17. IMPROVEMENT SECURITY.

17. 1 This Agreement shall be secured by good and sufficient security, which shall be filed with the CITY prior to commencement of construction. Such improvement security shall consist of security set forth in Bakersfield Municipal Code Chapter 16.32. Any corporate surety bond issued pursuant to Bakersfield Municipal Code Section 16.32.020 -3 shall substantially conform to the form set forth in Section 66499. 1 of the Map Act or any successor statute. The estimated cost of the various features of the Park Improvements, as shown on attached Engineer' s Bond estimate, Exhibit " E" attached hereto and incorporated as though fully set forth herein, shall be used, if applicable, as the basis for the reduction of security in connection with the CITY acceptance of Park Improvements.

17.2 Said improvement security shall be in the amount of one hundred percent ( 100 %) of the total estimated cost of construction of the Park Improvements as outlined on the Engineer' s Bond estimate conditioned upon the faithful performance of the agreement for the full and timely completion of the Park Improvements in accordance with this Agreement.

Acquisition, Dedication &Development Agreement
WoodbddgeAcgDevWMing- F. Iger.20141118.05
gAKF9 Page 8 of 17 Pages -- p
s
r
J

ORPINAL

17.3 Additional improvement security shall also be provided in an amount of fifty percent (50 %) of the total estimated cost of construction of the Park Improvements, securing payment to the contractor, its subcontractors, and to persons renting equipment or furnishing labor or materials to it for the work.

17.4 Additional improvement security shall also be provided in an amount of ten percent ( 10 %) of the total estimated cost of the construction of the Park Improvements, to be provided prior to CITY acceptance of the Park Improvements, to secure SUBDIVIDER' s obligation to warrant the Park Improvements, for a period of one ( 1) year following recordation of the Notice of Completion for the Park Improvements, against any defective work or labor done or defective materials furnished.

18. REDUCTION AND RELEASE OF SECURITY.

18. 1
Improvement security may be reduced on order of the City Engineer upon completion of a phase of work which is operational and usable as a public improvement as set forth above.

18.2 Improvement security for payment to the contractor, or any of its subcontractors or any person renting equipment or furnishing labor or materials to it for the Park Improvements may, sixty ( 60) days after recordation of a Notice of Completion, be reduced to an amount not less than the total of all claims on which an action or stop notice has been filed and notice thereof given in writing to CITY, and if no such action or stop notice is filed, such improvement security may be released in full.

18.3 The security identified in paragraph 17.4 shall be finally released to the SUBDIVIDER one ( 1) year following the recordation of a Notice of Completion and Acceptance by CITY, provided that no defective work or labor done or defective materials furnished in the performance of the work has been discovered within such one ( 1) year period and reported in writing to CITY, and further provided that no damage has been done to the Park Improvements after its approval by any other work undertaken by the SUBDIVIDER.

18.4 In the event defective work, labor or materials has been discovered or damage to the Park Improvements has resulted from SUBDIVIDER' s other work, the security shall be released upon satisfactory repair or replacement of the defective or damaged Park Improvements, as determined by CITY, or after expiration of the one ( 1) year specified above, whichever occurs later.

19. COMPLETION BY SURETY OR CITY.

Acquisition, Dedication & Development Agreement
WoodbddgeAcgDevWMing- F. Iger.20141 118.05
0 g AKF9

Page 9 of 17 ends

r
ORICAINAL.

19. 1
If the City Engineer, in the exercise of reasonable discretion, determines that:

19. 1. 1 The SUBDIVIDER has failed to properly and fully complete all of the work of improvement in accordance with this Agreement, and within the time, or any extension of time, provided herein; or

19. 1. 2 The SUBDIVIDER has failed or neglected to begin the work, or any feature of the work, within a time which will reasonably allow its completion within the time, or any extension of time, provided in this Agreement; or

19. 1. 3 The SUBDIVIDER has abandoned any of the work; or

19. 1. 4The SUBDIVIDER, if an individual, has been declared incompetent or placed under the care of a guardian or conservator, or has disappeared; or

19. 1. 5 The SUBDIVIDER has filed a petition in bankruptcy or has been declared bankrupt;
then the City Engineer may give the SUBDIVIDER and its surety fourteen ( 14) days' written notice to proceed with the work, without prejudice to any other remedy CITY may have in law or equity.

19.2 If the surety proceeds with the work, the surety shall be subject to all of the provisions of this Agreement.

19.3 If the SUBDIVIDER or its surety shall fail or neglect to proceed with the work diligently and in good faith in accordance with this Agreement after such notice has been given, CITY may thereafter, at its sole option and without prejudice to any other remedy, provide the necessary supervision, equipment, materials and labor as it may determine necessary to undertake and complete the work of improvement or any part thereof in the manner required by this Agreement, by independent contract or by CITY forces, all for the account and at the expense of the SUBDIVIDER, and the SUBDIVIDER and its surety shall be liable to CITY and shall pay CITY, on demand, any expenses, costs, fees or other expenditures incurred by CITY in the course thereof.

20. SUBDIVIDER' S WARRANTIES. SUBDIVIDER warrants and represents it is the sole owner of, or has the right to acquire, in fee simple, the Park property and has or shall have the right and legal ability to transfer or cause to be transferred said Park as set forth in this Agreement to CITY.

Acquisition, Dedication & Development Agreement
WoodbridgeAcgDevWMing- F. Iger.20141 118.05

Page 10 of 17 ends

AKF
f— in
U

ORIGINAL

21. INSURANCE. In addition to any other insurance or bond required under this Agreement, SUBDIVIDER shall procure and maintain for the duration of this Agreement the following types and limits of insurance ( "basic insurance requirements" herein):

21. 1 Automobile liability insurance, providing coverage on an occurrence basis for bodily injury, including death, of one or more persons, property damage and personal injury, with limits of not less than One Million Dollars ($ 1, 000,000) per occurrence; and the policy shall:

21. 1. 1 Provide coverage for owned, non -owned and hired autos.

21. 2 Broad form commercial aeneral liability insurance, unless otherwise approved by the CITY' s Risk Manager, providing coverage on an occurrence basis for bodily injury, including death, of one or more persons, property damage and personal injury, with limits of not less than One Million Dollars ($ 1, 000,000) per occurrence; and the policy shall:

21. 2. 1 Provide contractual liability coverage for the terms of this Agreement.

21. 2.2 Provide products and completed operations
coverage.

21. 2.3 Contain an additional insured endorsement in favor of CITY, its mayor, council, officers, agents,
employees and volunteers.

21. 2.4 All policies shall be written on a first - dollar coverage basis, or contain a deductible provision. Subject to
advance approval by the CITY, SUBDIVIDER may
utilize a Self- Insured Retention provided that the
policy shall not contain language, whether added by
endorsement or contained in the Policy Conditions,
that prohibits satisfaction of any Self- Insured provision or requirement by anyone other than the Named
Insured, or by any means including other insurance or
which is intended to defeat the intent or protection
of an Additional Insured.

Acquisition, Dedication & Development Agreement
WoodbddgeAcgDevWMing- F. Iger.20141118.05

Page 1 ends

4gAK Cy
O R
r
r'-
ORIGINAi.

21. 3 Workers' compensation insurance with statutory limits and employer's liability insurance with limits of not less than One Million Dollars 1, 000,000) per occurrence; and the policy shall contain a waiver of subrogation in favor of the CITY, its mayor, council, officers, agents, employees and designated volunteers.

21. 4 All policies required of the SUBDIVIDER shall be primary insurance as to the CITY, its mayor, council, officers, agents, employees, or designated volunteers and any insurance or self- insurance maintained by the CITY, its mayor, council, officers, agents, employees, and designated volunteers shall be excess of SUBDIVIDER' s insurance and shall not contribute with it.

21. 5 Except for workers' compensation, insurance is to be placed with insurers with a Best' s rating as approved by CITY' s Risk Manager, but in no event less than A -:VII. Any deductibles, self- insured retentions or insurance in lesser amounts, or lack of certain types of insurance otherwise required by this Agreement, or insurance rated below Best' s A -:VII, must be declared prior to execution of this Agreement and approved by the CITY in writing.

21. 6 Unless otherwise approved by CITY' s Risk Manager, all policies shall contain an endorsement providing the CITY with thirty ( 30) day' s written notice of cancellation or material change in policy language or terms. All policies shall provide that there shall be continuing liability thereon, notwithstanding any recovery on any policy. Copies of policies shall be delivered to CITY on demand.

21. 7 The insurance required hereunder shall be maintained until all work required to be performed by this Agreement is satisfactorily completed as evidenced by written acceptance by the CITY.

21. 8 SUBDIVIDER shall furnish the City Risk Manager with a certificate of insurance and required endorsements evidencing the insurance required. The CITY may withdraw its offer of contract or cancel this contract if certificates of insurance and endorsements required have not been provided prior to the execution of this Agreement.

21. 9 Full compensation for all premiums which SUBDIVIDER is required to pay on all the insurance described herein shall be considered as included in the prices paid for the various items of work to be performed under the Agreement, and no additional allowance will be made therefore or for additional premiums which may be required by extensions of the policies of insurance.

Acquisition, Dedication & Development Agreement
WoodbridgeAcgDevWMing- F. Iger.20141 118.05

Page 12 of 17 ends

m
r
U 4
ORK3INAL
111i4w * 0

21. 10 It is further understood and agreed by SUBDIVIDER that its liability to the CITY shall not in any way be limited to or affected by the amount of insurance obtained and carried by SUBDIVIDER in connection with this Agreement.

21. 11 Unless otherwise approved by the CITY, if any part of the work under this Agreement is subcontracted, the " basic insurance requirements" set forth above shall be provided by, or on behalf of, all subcontractors even if the CITY has approved lesser insurance requirements for SUBDIVIDER.

22. INDEPENDENT CONTRACTOR. This Agreement calls for the performance of the services of SUBDIVIDER as an independent contractor.

SUBDIVIDER is not an agent or employee of the CITY for any purpose and is not entitled to any of the benefits provided by CITY to its employees. This Agreement shall not be construed as forming a partnership or any other association with SUBDIVIDER other than that of an independent contractor.

23. INDEMNITY. SUBDIVIDER shall indemnify, defend, and hold harmless CITY, its officers, agents and employees against any and all liability, claims, actions, causes of action or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, arising out of, connected with, or caused by SUBDIVIDER, SUBDIVIDER' s employees, agents, independent contractors, companies, or subcontractors in the performance of, or in any way arising from, the terms and provisions of this Agreement whether or not caused in part by a party indemnified hereunder, except for CITY' s sole active negligence or willful misconduct.

24. MERGER AND MODIFICATION. This Agreement sets forth the entire Agreement between the parties and supersedes all other oral or written representations. This Agreement may be modified only in a writing approved by the City Council and signed by all the parties.

25. EXHIBITS. In the event of a conflict between the terms, conditions or specifications set forth in this Agreement and those in exhibits attached hereto, the terms, conditions, or specifications set forth in this Agreement shall prevail. All exhibits to which reference is made in this Agreement are deemed incorporated in this Agreement, whether or not actually attached.

26. GOVERNING LAW. The laws of the State of California will govern the validity of this Agreement, its interpretation and performance. Any litigation arising in any way from this Agreement shall be brought in Kern County, California.

Acquisition, Dedication &Development Agreement
Woodb6dgeAcgDevWMing- F. Iger.20141 118. 05

Page 13 of 17 ends

S
m
L)
81'GINAL

27. SEVERABILITY. If any provision of this Agreement may prove to be invalid, void or illegal, it is the intent of the parties that all other provisions of this Agreement shall remain fully valid, enforceable and binding on the parties hereto.

28. NO WAIVER OF DEFAULT. The failure of any party to enforce against another a provision of this Agreement shall not constitute a waiver of that party's right to enforce such a provision at a later time and shall not serve to vary the terms of this Agreement.

29. COUNTERPARTS. This Agreement may be executed simultaneously or in one or more counterparts, each of which shall be deemed an original but all of which together constitute one and the same instrument.

30. EXECUTION. This Agreement is effective upon execution. It is the product of negotiation and all parties are equally responsible for authorship of this Agreement. Section 1654 of the California Civil Code shall not apply to the interpretation of this Agreement.

31. CORPORATE AUTHORITY. Each individual signing this Agreement on behalf of entities represents and warrants that they are, respectively, duly authorized to sign on behalf of the entities and to bind the entities fully to each and all of the obligations set forth in this Agreement.

32. NON - INTEREST. No officer or employee of the CITY shall hold any interest in this Agreement (California Government Code Section 1090).

33. ACCEPTANCE. The acceptance of work or services, or payment for work or services, by CITY shall not constitute a waiver of any provisions of this Agreement.

34. ASSIGNMENT. This Agreement shall not be assigned by any party, or any party substituted, without prior written consent of all parties.

35. COMPLIANCE WITH ALL LAWS. SUBDIVIDER shall, at no cost to the CITY, comply with all of the requirements of Municipal, State, and Federal authorities now in force, or which may hereafter be in force, pertaining to this Agreement, and shall faithfully observe in all activities relating to or growing out of this Agreement all Municipal ordinances and State and Federal statutes, rules or regulations, and permitting requirements now in force or which may hereafter be in force including, without limitation, obtaining a City of Bakersfield business tax certificate (Bakersfield Municipal Code Chapter 5.02) where required.

Acquisition, Dedication &Development Agreement
WoodbddgeAcgDevW Ming- F. Iger.20141118.05
0 A KF9

Page 14 of 17 ends

t_ m
U C3

ORIGINAL
M36. COVENANTS RUN WITH THE LAND. All provisions of this Agreement shall run with the land and be binding upon the parties, their respective heirs, administrators, executors, successors, assigns, devisees, representatives and all other persons or entities acquiring the property (or any portion thereof or interest therein) which is the subject of this Agreement.

37. RECORDATION. This agreement shall be recorded at the Kern County Hall of Records.

38. NOTICES. All notices relative to this Agreement shall be given in writing and shall be personally served or sent by certified or registered mail and be effective upon actual personal service or depositing in the United States mail.

The parties shall be addressed as follows, or at any other address designated by notice:

CITY: CITY OF BAKERSFIELD

RECREATION AND PARKS DEPARTMENT
1600 Truxtun Avenue
Bakersfield, Calffornia 93301
Telephone: ( 661) 326 -3866
SUBDIVIDER: SIERRA OAKS PARTNERS LLC
ATTENTION: TODD CUNNINGHAM
27285 Las Ramblas, Suite 239
Mission Viejo, CA 92691
Telephone: ( 949) 348 -8162
With a copy to: BOLTHOUSE PROPFERTIES, LLC
ATTENTION: STEPHAN J. DEBRANCH
2000 Oak Street, Suite 200
Bakersfield, CA 93301
Telephone: ( 661) 323 -4005

39. TAX NUMBERS.

SUBDIVIDER' s Federal Tax Identification Number: L46- 30744-3S3S Is SUBDIVIDER a corporation? Yes No X
Please check one.)

40. FURTHER ASSURANCES. Each party shall execute and deliver such papers, documents and instruments, and perform such acts as are necessary or appropriate, to implement the terms of this Agreement and the intent of the parties to this Agreement.

Acquisition, Dedication & Development Agreement
WoodbridgeAcq DevWMi ng- F. Iger.201411 18. 05

Page 15 of 17 ends

gAKF9
v o

ORIGINAL

41. HAZARDOUS MATERIALS. SUBDIVIDER knows of no hazardous material stored, dumped or in any way placed in, on, over or about Park. SUBDIVIDER knows of no activities, either public or private, wherein SUBDIVIDER or a third party has placed or dumped any hazardous material of any nature in, on, over or about Park. SUBDIVIDER takes full responsibility for cleaning up any hazardous material placed in, on or about Park at any time prior to CITY taking title and hereby fully indemnifies CITY, and CITY' s successors and assigns, from any and all liability, claims, actions, causes of action or demands whatsoever for clean up of hazardous materials found in, on, over or about Park placed prior to CITY taking title.

42. NEGATION OF PARTNERSHIP. CITY shall not become or be deemed a partner or joint venturer with SUBDIVIDER or associate in any such relationship with SUBDIVIDER by reason of the provisions of this Agreement. SUBDIVIDER shall not for any purpose be considered an agent, officer or employee of CITY.

43. APPLICABILITY OF CERTAIN LAWS. SUBDIVIDER acknowledges that it is represented by its own separate legal counsel in regard to this Agreement.

SUBDIVIDER accepts responsibility for and shall be responsible for identification of and for compliance with all applicable laws pertaining to constructing those improvements referenced above and the contract or contracts pertaining thereto, including but not limited to the Labor Code, the Public Contract Code, and the Government Code of the State of California. CITY makes no representation as to the applicability or inapplicability of any laws regarding contracts, including contracts related to the construction of the Park Improvements, and especially the matters of competitive bidding and the payment of prevailing wages. SUBDIVIDER will neither seek to hold nor hold the CITY liable, and shall hold harmless and indemnify CITY, each of its officers, officials and employees for any consequence of any failure by SUBDIVIDER to correctly determine applicability of any such requirements to any contract it enters into, irrespective of whether CITY knew or should have known about applicability of any such requirement. This paragraph shall apply with respect to any enforcement action, whether public or private, and whether brought by a public enforcement agency or by private civil litigation, against SUBDIVIDER or CITY or both with respect to the matters addressed by this paragraph.

Acquisition, Dedication &Development Agreement
WoodbridgeAcgDevW Ming- F. Iger.20141 118.05

Page 16 of 17 ends

v

ORIGINAL
n
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed, the day and year first -above written.

CITY"

CITY OF BAK
HARVEY L. HALL
Mayor
APPROVED AS TO FORM:

VIRGINIA GENNARO
City Attorney
By:

RICHARD IGER
Associate City Attorney
Insurance: CU ,
APPROVED AS TO CONTENT:

RECREATION AND PARKS DEPARTMENT
By: L Z _

DIANNE HOOVER
Recreation and Parks Director
COUNTERSIGNED:

By:

NELSON K. SMITH
Finance Director
SUBDIVIDER"

SIERRA OAKS PARTNERS LLC
B
Print Name: SaS r` 4±rc; ry
Title: Senior P(`d; ccj' /AatnG1r.P!-
Rl: lsc
Attachments: Exhibit "A" - Legal Description of Park Dedication Exhibit " B" - Park Map
Exhibit " C" - Description of Plans and Specifications for Park Improvements Exhibit " D" - Zone of Benefit
Exhibit " E" - Engineer' s Bond Estimate
Certificates of Insurance
Acquisition, Dedication & Development Agreement
WoodbridgeAcgDevWMing- F. Iger.20141118.05

Page 17 of 17 ends

v

ORIGINAL
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL •.

A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California )
County of 1 , fjry` )
r
n
A.

On IMO*rCk 25 t
2015 before me, JWINAL - N- Qbk" N RA10Jl L ,
Date Here Insert Name and Title of the Officer
personally appeared U11
of Signer(s)
who proved to me on the basis of satisfactory evidence to be the personas) whose name( is /arw subscribed to the within instrument and acknowledged to me that he /shefthey executed the same in his /herkheir authorized capacity(ies'), and that by his /herftheir signature(g) on the instrument the person(; or the entity upon behalf of which the person(4 acted, executed the instrument. rLOA JENNIFER N. OdERT
ComaNt Ion # 2073517
Nowt' Pume - call tnll
KIM County
MV Comm. ith Jul 31 2018
I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature 141#
Signature of Notary Public
Place Notary Seal Above

OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document- --- Description of Attached Document
Title or Type of Document:

Number of Pages: Signer(s) Other Than
Capacity(ies) Claimed by Signer(s)
Signer's Name:

Corporate Officer — Title(s):

Partner — Limited eneral
Individual orney in Fact
El Trustee Guardian or Conservator
Other:

Signer Is epresenting:

Date:

Above:

Signer' s Name:

Corporate Officer — Title(s):

Partner — Limited General
Individual Attorney in Fact
Trustee Guardian or Conservator
Other:

Signer Is Representing:
02014 National Notary Association • www.NationalNotary.org • 1- 800 -US NOTARY ( 1- 800 - 876 -6827) Item # 5907 AKF9s
F- T
U
rORIGINAL,
EXHIBIT " A"

PARK SITE

LEGAL DESCRIPTION
ALL THAT PORTION OF PARCELS 10 AND 11 OF PARCEL MAP 12100 RECORDED DECEMBER 30, 2014, 2014 IN BOOK 59 OF PARCEL MAPS, AT PAGE 178 IN THE

OFFICE OF THE KERN COUNTY RECORDER, LYING WITHIN THE NORTH HALF OF SECTION 13, TOWNSHIP 30 SOUTH, RANGE 26 EAST, MOUNT DIABLO BASE AND

MERIDIAN, IN THE CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA, MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHEAST CORNER OF SAID PARCEL 10, SAID POINT LYING ON A 2404.00

FEET RADIUS CURVE CONCAVE NORTHEASTERLY WHOSE RADIAL BEARS NORTH 59 °26'37" EAST, SAID POINT ALSO BEING ON THE SOUTHWESTERLY RIGHT -OFWAY OF WINDERMERE STREET; THENCE ( 1) ALONG SAID RIGHT -OF -WAY, SOUTHEASTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 07 030'49 ", AN ARC DISTANCE OF 315.25 FEET TO

THE BEGINNING OF A TANGENT REVERSE CURVE CONCAVE WESTERLY, HAVING A RADIUS OF 49.00 FEET WHOSE RADIAL BEARS NORTH 51 055'48" EAST; THENCE (2) CONTINUING ALONG SAID RIGHT -OF -WAY, SOUTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 87 035'37 ", AN ARC DISTANCE OF 74.91 FEET;
THENCE ( 3) CONTINUING ALONG SAID RIGHT -OF -WAY, SOUTH 49 °31' 25" WEST A DISTANCE OF 575.57 FEET TO THE BEGINNING OF A TANGENT CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 946.00 FEET;
THENCE (4) CONTINUING ALONG SAID RIGHT -OF -WAY, SOUTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 03 °36' 51 ", AN ARC DISTANCE OF 59.67

FEET TO THE BEGINNING OF A COMPOUND CURVE CONCAVE NORTHERLY HAVING A RADIUS OF 35.00 FEET, WHOSE RADIAL BEARS NORTH 36 °51' 44" WEST; THENCE ( 5) CONTINUING ALONG SAID RIGHT -OF -WAY, WESTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 49042'22 ", AN ARC DISTANCE OF 30.36

FEET TO THE BEGINNING OF A REVERSE CURVE CONCAVE SOUTHERLY HAVING A RADIUS OF 95.00 FEET, WHOSE RADIAL BEARS SOUTH 12050'38" WEST; THENCE (6) CONTINUING SOUTH ALONG SAID RIGHT -OF -WAY, WESTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 44 °21' 37 ", AN ARC DISTANCE OF

73. 55 FEET TO THE BEGINNING OF A REVERSE CURVE CONCAVE NORTHERLY HAVING A RADIUS OF 35.00 FEET, WHOSE RADIAL BEARS NORTH 31030' 59" WEST; THENCE ( 7) WESTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 48043' 44 ", AN ARC DISTANCE OF 29. 77 FEET TO THE BEGINNING OF A COMPOUND CURVE CONCAVE NORTHEASTERLY HAVING A RADIUS OF 946. 00 FEET, WHOSE RADIAL BEARS NORTH 17 °12'45" EAST, SAID POINT BEING ON THE NORTHERLY RIGHT -OF -WAY OF ARBOR REAL DRIVE;
PAGE 1 OF 2
0 0AKF9
T
rn
v

ORIGINAL
THENCE (8) ALONG SAID NORTHERLY RIGHT -OF -WAY, NORTHWESTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 11 " 05' 15 ", AN ARC DISTANCE OF 183.06 FEET;
THENCE (9) NORTH 35 °26'38" EAST, A DISTANCE OF 637. 85 FEET; THENCE ( 10) NORTH 29 °31' 54" WEST, A DISTANCE OF 289.52 FEET; THENCE ( 11) NORTH 60 °58' 51" EAST, A DISTANCE OF 302.05 FEET TO A POINT LYING ON A 2404.00 FEET RADIUS NON - TANGENT CURVE CONCAVE NORTHEASTERLY WHOSE RADIAL BEARS NORTH 65 035'40" EAST, SAID POINT ALSO BEING A POINT ON THE SOUTH RIGHT -OF -WAY OF WINDERMERE STREET; THENCE ( 12) SOUTHEASTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 06 009' 02 ", AN ARC DISTANCE OF 258.07, TO THE POINT OF BEGINNING.

CONTAINING 8. 20 GROSS ACRES, MORE OR LESS.

W. PZ
1 f 4G JJTTO
I
CALIT
s4 -/ T
PAGE 2 OF 2
o 0AKF9sT
r
v Cr
ORIGINA1
PARCEL 11
P. M. No. 12100
P. M. BK. 59., PG. 178.

EXHIBIT ' B'
5 PARCEL
LINER o
N89' 19'
yam ` 338.

PARCEL 10
P. M. No. 12100
P. M. BK. 59., PG. 178.
1w
STREAM ENERGY, INC. ` b i
GOSFORD 4 44U - 13" cal
Z
ABANDONED PLUGGED) .
h
Pq qti
4 ENERGY, INC.

RD 4 44X - 13"
DATE: 01113/2015
1 I
JOB No. 0H
ENGINEER: FP52
OF 1 SHEETS III DRAFTSMEN: NMS

CURVE TABLE

CURVE RADIUS LENGTH DELTA TANGENT
C1 2404. 00' 258.07' 6'09' 02' 129.16'
C2 2404.00' 315, 25' 7' 30' 49" 157. 85'
C3 49. 00' 74.91' 8735' 37" 46. 98'
C4 946.00' 59. 67' 336' 51" 29. 85'
C5 35,00' 30.36' 1 49' 42' 22" 16. 21'
C6 95.00' 73.55' 44'21' 37" 38. 73'
C7 35.00' 29.77' 48'43'44" 15.85'
C8 946.00' 183. 06' 11' 05' 15" 1 91. 82'
48 "W
79 ' A\
POINT OF \

BEGINNING

PARK SITE

DEDICATION

8. 20 GROSS ACRES
6 "

CURVE TABLE

RADIAL BEARING
R1 S1 2' 50' 38 "W
R2 N31' 30' 59 "W
R3 N1712' 45 "E
R4 N36'51' 44 "W
R5 I N2817'60 "E
v
A
9,Q\
o
STREAM ENERGY, INC. ` V
GOSFORD 4 54 - 13" \
w (

ABANDONED, PLUGGED)
A. PARCEL 9
P. M. No. 12100
N P. M. BK. 59., PG. 178.
o
N CENTER SECTION 13,
T30S, R26E, MDBM

MID - SECTION LINE
THIS MAP IS FOR ILLUSTRATIVE PURPOSES ONLY"
WMSP VILLAGE " F"

PARK SITE

CITY OF BAKERSFIELD
NSCALE: 1"= 200'
0 50 100 200
PORTER & ASSOCIATES, INC.

ENGINEERING & SURVEYI j c
1200 21st St, Bakersfield, 01 $ 30f
661. 327.0362 FAX 661927.1065
rrr

ORIGINAL

Exhibit "C Continued
1'
SUMMERS/MURPHY 6 PARTNERS, INC.

LANDSCAPE ARCHITECTS
34191 COAST HIGHWAY SUITE 200, DANA POINT, CALIFORNIA 92629 ( 949) 443 -1446 • FAX ( 949) 443 -1631 PARK

FACILITY REQUIREMENTS
Dedication of Land Yes
Design & Development Yes
Grading and Leveling Yes
Curb /Gutter /Sidewalks /street Improvements Yes
Utilities — Electric /Water /Sewer /Phone Line Yes
Security Lighting 8 Poles
Automatic Irrigation System Yes
Maxicom Computer Controlled
Restroom & Storage Building Fixtures 2 — Male / 2 — Female Playground Areas (3) Elementary & Tot Yes
Playground Shelters and Shade Structures Yes
Turf and Landscaping Soil Amendments Yes
Tree (48" Box) 25
Tree (36" Box) 40
Tree (24" Box) 100
Shrubs (5 Gallon Size) 2000
Shrubs (15 Gallon Size) 1000
Concrete Walkways Yes
Meandering D. G. Trail 6' Wide Yes
g AKF9
F-- m
J
r
r)RIGINAL
MIS
Aluminum Benches 28
Aluminum Tables 16
Barbeques 4
Drinking Fountains 5
Trash Containers 40
Bike Rack 4
Open Field Area Yes
Soccer Field 200' x 300'
Tennis Court 2
Amphitheater with Overhead Trellis and D. G Stage 1
Tubular Steel Fence with Access Openings Yes
Parking Lot w/ ( 2) H. C. Parking Stalls Yes
Monument Wall with Park Name Yes
City Standards & Specs Yes
Masonry Block Wall along Western Border of Park Yes
Adjacent to Future Residential

EXHIBIT C
o``
0AKF9
r.- m
r
U p

ORIGINAL
Z
w Exhibit "D"
yS * REGISrF
F
0 oM
V
0 z
0 Cr1
y
1 I
11 I!
1 f
f -'
v
L
I1
1 1
II
N (
1 I
1 1
I W i
1 (
11 1
I
I;
1 M
rl
1 I, ( X
1 1
zd 1
o
LOT 1 LLA
No. 13 - 0179 J — L BUENA
1 (- -- - - - --- - - -- - -- - °- - - - - - -- ROAD _.,----------------- r--
aAx a
v o

ORIGINAL
Exhibit "E"
JIMIM12
SUMMERS /MURPHY & PARTNERS INC.

LANDSCAPE ARCHITECTS
reri...,. e.. nrre -wa <, e •. us. r... y. v. o va,
BELCOURT AT SEVEN OAKS 8. 2 ACRE PARK
Sierra Oaks Partners, LLC
Note: • This is a bond estimate only and not to be used for pay any other purposes.

Preliminary Ooinion of Cost Estimate

HARDSCAPE
Parking Lot Paving 15177 s. f. 151, 770.00
Concrete Walk Paving inside 39010 s. f. 175, 545.00
Concrete Parkway outside 15759 s. f. 70,915. 50
Park Trail 9270 s. f. 23, 175.00
Tennis Courts ( 2)
25 150,000.00
Restroom 750 s. f. 75,000.00
Shade Structures ( 2) 1200 s. f. 102,000.00
Tension Shade at Amphitheater 1350 s. f. 60,750.00
Drinking Fountains (4)
2000
48,000.00
Bike Racks ( 3)
1000
9, 000,00
Safety Fencing along roadways 1200 I. f. 54,000.00
Park Signage and Kiosk
8000
50,000.00
Park Lighting (parking lot, walkway)
60 75,000.00
Tot Lot (age group play equip, rubber surface)
61640 s. f.
100,000.00
Mansonry Block Wall ( Western Border to the Park) 877 Lf 57,005.00 SUB TOTAL $ 1, 202, 160.50

SOFTSCAPE
Soil Prep & Fine Grade 270500 s. f. 94,675.00
Automatic Irrigation 270500 s. f. 405,750.00
Hydro seeded Turf 230744 s.f. 80,760.40
Trees
48 inch box 25 32,500.00
36 inch box 40 20,400.00
24 inch box 100 25,000.00
Shrubs
5 gallon 2000 30,000.00
15 gallon 1000 85,000.00
Ground Covers
1 gallon 8000 52, 000.00
Vines 15 gallon 60 5, 100.00
Mulch 3 inches in shrub areas 61640 s. f. 40,066.00
SUB TOTAL $ 871,251. 40
TOTAL $ 2, 073,411.90
CONTINGENCY 15% $ 2. 384.423. 69
p
0AKF9
F m
r
v a
C?R104INAL
1111111r v
POLICY NUMBER: COMMERCIAL GENERAL LIABILITY
CG 20 12 05 09
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

ADDITIONAL INSURED - STATE OR GOVERNMENTAL AGENCY

OR SUBDIVISION OR POLITICAL SUBDIVISION - PERMITS OR

AUTHORIZATIONS
This endorsement modifies insurance provided under the following:

State Or Governmental Agency Or Subdivision Or Political Subdivision:

Per Written Contract
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.

COMMERCIAL GENERAL LIABILITY COVERAGE PART

SCHEDULE
Section II — Who Is An Insured is amended to include
as an insured any state or governmental agency or
subdivision or political subdivision shown in the
Schedule, subject to the following provisions:

1. This insurance applies only with respect to operations performed by you or on your behalf for which the state or governmental agency or subdivision or
political subdivision has issued a permit or authorization.

2. This insurance does not apply to:
a. " Bodily injury", "property damage" or "personal and advertising injury" arising out of operations performed for the federal government, state or municipality; or
b. "Bodily injury" or "property damage" included within the " products- completed operations hazard ".

CG 20 12 05 09 Insurance Services Office, Inc., 2008
0AK
9

Page 1 of 1 ends

ORIGINAI
n SIERR05 OP ID: EM

ACORO CERTIFICATE OF LIABILITY INSURANCE

DATE ( MM /DDIYYYY)
03/02/2015
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER( S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER
Clifford & Bradford Ins Agency
1515 20th Street
Bakersfield,
Michael W. CooperCooper er

CONTACT
Courtney Cole
PHONE FAX A/ No E1, 11: 661 - 283 -8100 ( AIC No): 661- 283 -8111 nlDRESS: [email protected]

X COMMERCIAL GENERAL LIABILITY
INSURER(S) AFFORDING COVERAGE NAIC #
INSURER A: United Specialty Ins. Co.

EACH OCCURRENCE
INSURED Sierra Oaks Partners LLC
Woodbridge Pacific Group, Inc.
27285 Las Ramblas Ste 230
INSURER B:

INSURER C:

X
INSURER D'.

BT01416699
Mission Viejo, CA 92691
INSURER E:

PREMISES Ea occurrence EXCLUDE
INSURER F:

MED EXP ( Any one person) EXCLUDE
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

INSR LTR TYPE OF INSURANCE I
ACCORDANCE WITH THE POLICY PROVISIONS.

POLICY NUMBER

POLICY EFF MMIDDIYYW MMIDDIYYYY POLICY EXP LIMITS
A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE 2, 000, 000 CLAIMS -MADE Al OCCUR X BT01416699 03115/2014 03/ 15/2017 PREMISES Ea occurrence EXCLUDE MED EXP ( Any one person) EXCLUDE
PERSONAL & ADV INJURY 2,000,00
GEN' L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE 2,000,000 X POLICY F] PRO
JECT LOC PRODUCTS - COMP /OP AGG 2,000, 000
OTHER:

AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT
Ea accident
BODILY INJURY (Per person) ANY AUTO

ALL OWNED SCHEDULED

AUTOS AUTOS
BODILY INJURY (Per accident)

PROPERTY DAMAGE
HIRED AUTOS Per accident

NON -OWNED
AUTOS

UMBRELLA LIAR OCCUR EACH OCCURRENCE

EXCESS LIAB CLAIMS -MADE AGGREGATE
DED I I RETENTION $

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY Y / N

ANY PROPRIETOR/ PARTNER /EXECUTIVE
PER -

STATUTE ER
E. L. EACH ACCIDENT
OFFICER/ MEMBER EXCLUDED? N I A
Mandatory In NH) E. L. DISEASE - EA EMPLOYEE
If yes, describe under
DESCRIPTION OF OPERATIONS below E. L. DISEASE - POLICY LIMIT DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES ( ACORD 101, Additional Remarks Schedule, may be attached If more space is required)

CITY OF BAKERSFIELD ITS MAYOR, COUNCIL OFFICERS, AGENTS EMPLOYEES AND VOLUNTEERS ARE AD61TIONAL INSURED TO fHE GENERAL LIABILITY PER FORM CG2012 05/09.

CERTIFICATE HOLDER CANCELLATION

CITYBAK

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

CITY OF BAKERSFIELD

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

RISK MANAGEMENT OFFICE
1501 TRUXTUN AVE

AUTHORIZED REPRESENTATIVE
BAKERSFIELD, CA 93301
1988 -2014 ACORD CORPORATION.

ACORD 25 ( 2014/01) The ACORD name and logo are registered marks of ACORD All rights re r
9 d.
m F-- r—
v °
ORIG" AL
III :, WOODPAC -01 HEPE
ACOR" CERTIFICATE OF LIABILITY INSU NCE
DATE (MMIDDlYYM
9/ 3012014
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s).

PRODUCER
Automatic Data Processing Insurance Agency, Inc
1 ADP Boulevard
Roseland, NJ 07068
NAME:

PHONE FAX AIC No
ADDRESS: EMAIL
INSURERS) AFFORDING COVERAGE NAIC i
INSURER A: AIG Property Casualty Co
INSURED Woodbridge Pacific Group
27285 Las Ramblas Ste 230
Mission Viejo, CA 92691-
INSURERB:

INSURERC:

EACH OCCURRENCE
INSURER D:

PREMISES Ea occurrence
INSURER E :

MED EXP ( Any one person)
INSURER F :

PERSONAL & ADV INJURY
CAVFRAGFS CERTIFICATE NUMBER: REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

IN SR

TYPE OF INSURANCE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Bakersfield

POLICY NUMBER MMIDD EFF MM, EXP
LIMITS

AUTHORIZED REPRESENTATIVE

GENERAL LIABILITY

COMMERCIAL GENERAL LIABILITY

CLAIMS -MADE F OCCUR

EACH OCCURRENCE
PREMISES Ea occurrence
MED EXP ( Any one person)

PERSONAL & ADV INJURY

GENERAL AGGREGATE

GEN' L AGGREGATE LIMIT APPLIES PER

POLICY PIE LOC

PRODUCTS - COMP /OP AGG

AUTOMOBILE LIABILITY

ANY AUTO

ALL OWNED SCHEDULED
AUTOS

N N -OWNED

HIRED AUTOS AUTOS

COMBINED SINGLE LIMIT
Ea accident
BODILY INJURY ( Per person)
BODILY INJURY ( Per accident)
PPROaERdYDAMAGE

UMBRELLALIAB

EXCESS LIAB
OCCUR

CLAIMS- MADE

EACH OCCURRENCE

AGGREGATE

DED RETENTION
A

WORKERS COMPENSATION
AND EMPLOYERS' LIABILnY YIN

ANY PROPRIETORIPARTNERIEXECUTIVE
OFFICER/MEMBER F—] EXCLUDED?
Mandatory in NH)
If yes. desonbe under
DESCRIPTION OF OPERATIONS below
NIA
X WC065256310 5/ 28/ 2014 5/ 28/2015
W STATU- 0THY LIMITS ER
E L. EACH ACCIDENT 1, 000,00
E. L. DISEASE - EA EMPLOYEE 1, 000,00
E . DISEASE - POLICY LIMIT 1 $ 1, 000,00
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES ( Attach ACORD 101, Additional Remarks Schedule, If more space is required)

CERTIFICATE HOLDER CANCELLATION
U 18BS - ZU1U AGUKU GUKF' UKA I l
ACORD 25 ( 2010/ 05) The All name and logo are registered marks of ACORD All ngnis ress ervel I
i=rn
v o

ORIGINAL

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Bakersfield ACCORDANCE WITH THE POLICY PROVISIONS.

Public Works Department
1600 Truxton Ave AUTHORIZED REPRESENTATIVE
Bakersfield, CA 93301-
U 18BS - ZU1U AGUKU GUKF' UKA I l
ACORD 25 ( 2010/ 05) The All name and logo are registered marks of ACORD All ngnis ress ervel I
i=rn
v o

ORIGINAL
J

WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT -- CALIFORNIA This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below.

The following " attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy).

This endorsement, effective 12:01 AM 05/ 28/ 2014 forms a part of Policy No. WC 065 -25 -6310 Issued to WOODBRIDGE PACIFIC GROUP INC
By GRANITE STATE INSURANCE COMPANY
Premium 2655
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. ( This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us).

You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule.

The additional premium for this endorsement shall be 5. 0 % of the California workers' compensation premium otherwise due on such remuneration.

Schedule
Person or Organization
C7ALIFFORNIA COASTAL COMMUNITIES, INC.

MiSSlAVIEJO, CA 92691
JOB NUMBER: NONE PROVIDED
JOB LOCATION: NEAR BOLSACHEEKA & WARNER AVENUE IN

HUNTINGTON BEACH, CA

WHISPERING HILLS, LLC
19800 MACARTHUR BLVD # 700
IRVINE, CA 92612
JOB NUMBER: NONE PROVIDED
JOB LOCATION: NEAR HIGHWAY 74 & LA PATA IN

SAN JUAN CAPISTRANO, CA
THE PREMIUM WILL BE 5% OF THE UNMODIFIED PREMIUM

ARISING OUT OF THE WORK FOR WHICH THE WAIVER IS
GRANTED. MINIMUM PREMIUM IS $ 250.

CITY OF BAKERSFIELD
1600 TRUXTON AVE.

BAKERSFIELD, CA 93301
THE PREMIUM WILL BE 5% OF THE UNMODIFIED PREMIUM

ARISING OUT OF THE WORK FOR WHICH THE WAIVER IS
GRANTED. MINIMUM PREMIUM IS $ 250.

Job Description

DEVELOP, BUILD, SELL
HOMES

DEVELOP, BUILD, SELL
HOMES
RE: PROJECT MGMT

FOR MASTERPLANNED

COMMUNITY
WC 04 03 06 Countersigned by _ _ _ _ _ _ t3AKF
Ed. 04184) 8- 9U
Authorized Representati ,
U C7

ORDINAL
AGREEMENT NO. 15 -070 ( 1)
AMENDMENT NO. 1 TO AGREEMENT NO. 15 -070
THIS AMENDMENT NO. ONE ( 1) TO AGREEMENT NO. 15 -070 is made and entered into on MAR 3 0 1016 ( the " First Amendment Date "), by and between the CITY OF BAKERSFIELD, a municipal corporation ( "CITY" herein), and SIERRA OAKS PARTNERS LLC, a Delaware limited liability company SUBDIVIDER" herein).

RECITALS
WHEREAS, on March 25, 2015, CITY and SUBDIVIDER entered into Agreement No. 15 -070 for the acquisition and development of Belcourt at Seven Oaks Park ( "Park "); and
WHEREAS, Agreement No. 15 -070 called for SUBDIVIDER to begin construction of Park prior to the issuance of any building permit and complete construction by March 1, 2016; and
WHEREAS, on September 2, 2015, SUBDIVIDER requested to delay the deadline to begin construction of Park due to a slowing of SUBDIVIDER' s home development forecast; and
WHEREAS, CITY agrees to amend Agreement No. 15 -070 in order to allow developer to build Park at a more appropriate time.

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and SUBDIVIDER mutually agree to amend Agreement No. 15 -070 as follows:

Section 1. Part I, Section 3 of Agreement No. 15 -070 is hereby amended to read as follows:

3. TIME OF CONSTRUCTION. SUBDIVIDER shall commence
construction of the Park by no later than the date that the City issues a building permit for the 300th residential dwelling unit within the Zone of Benefit, in addition to the building permits previously issued for the Park Square
apartments ( the " Park Commencement Date') and shall
complete construction within two years following the Park Commencement Date ( the " Park Completion Date "),
unless an extension of time is granted by CITY in writing and approved by the City Council. If construction of the Amendment No. I to Agreement No. 15 -070 0AKF9
Belcoutl70oksAckDevAgrAmend .20151206. 07 O

Page 1 of 7 ends

Z5ORIGINAL
Park has not commenced by the Park Commencement
Date, then no further building permits will be issued for residential dwelling units within the Zone of Benefit until SUBDIVIDER commences construction of the Park. If a
Notice of Completion of the Park is not recorded by the Park Completion Date, no further Building Permits will be issued for residential dwelling units within the Zone of Benefit until a Notice of Completion of the Park is
recorded.

Section 2. Part II of Agreement No. 15 -070 is hereby amended to read as follows:

REFUND TO SUBDIVIDER / SUBDIVIDER' S PARK DEVELOPMENT DEPOSITS /

DEDICATION UPON DEFAULT / SATISFACTION OF PARK DEVELOPMENT

REQUIREMENTS / NO CITY LIABILITY

6. Refund to SUBDIVIDER / SUBDIVIDER' s Park Development Deposits.

6. 1 Refund to SUBDIVIDER. Upon SUBDIVIDER' s
satisfactory completion of construction of the Park
Improvements, CITY shall refund to SUBDIVIDER the sum of Three Hundred Ninety -Two Thousand Two Hundred Twenty - Four Dollars ($ 392, 224.00) which SUBDIVIDER previously deposited with the CITY as security for parkland development in connection with the Park Square at Seven Oaks apartment project ( "SUBDIVIDER' s Park Square Deposit ").

6.2 SUBDIVIDER' s Park Development Deposits. In
order to provide further assurances to the CITY to secure SUBDIVIDER' s obligations under this Agreement, SUBDIVIDER and CITY agree as follows.

6. 2. 1 Upon the issuance of each building permit
for a residential dwelling unit within the Zone of Benefit SUBDIVIDER shall deposit with CITY an amount equal to the park development, improvement and enhancement fee
payable to the CITY for a similar residential dwelling pursuant to the provisions of Bakersfield Municipal Code Section 15. 82 effective as of the earlier of, ( i) the date of issuance of such gAKF9
Amendment No. I to Agreement No. 15 -070 U
s„
Belcoud70aksAckDevAgrAmend .2015120607 fn

Page 2 of 7 ends

OR NAI.
building permit, or ( ii) the date of approval or conditional approval of SUBDIVIDER' S vesting tentative map ( or other applicable vesting method), if any, which is applicable to the lot for which such building permit is issued ( each, a " Park Development Deposit," and collectively, " Park Development Deposits ").

6. 2.2 With respect to the Park Development
Deposits:

6. 2. 2. 1 In the event of SUBDIVIDER' s
material default of its obligations under this Agreement, CITY shall have and retain all such Park Development Deposits, and shall have the right to use the some for the development, improvement and /or enhancement of park facilities
benefiting the Zone of Benefit. The provisions of this Section

6. 2. 2. 1 shall not diminish or otherwise affect the CITY' s right to call upon or enforce the CITY' S improvement security as referenced in Sections 17 through 19 below.

6. 2.2.2 Upon SUBDIVIDER' s completion
of the Park Improvements in accordance with Article I and SUBDIVIDER' s conveyance of the Park to the CITY in
accordance with Article IV below, CITY shall refund to
SUBDIVIDER all Park Development Deposits theretofore
collected by the CITY, and thereafter CITY shall on a quarterly basis refund to SUBDIVIDER all additional Park Development Deposits collected by the CITY up to a total reimbursement to SUBDIVIDER equal to the lesser of the following, ( i) the total amount of the Park Development Deposits collected by the CITY upon the issuance of building permits for residential dwelling units within the Zone of Benefit, (ii) an amount equal to SUBDIVIDER' s actual verified costs incurred in the design, engineering and construction of the Park Improvements
including any subsequent park improvements constructed
for the Park as contemplated in Section 17. 1 below), or (iii) an amount equal to the Engineer' s Bond Estimate as referenced in Section 17. 1 below ( together with any subsequent
Engineer' s Bond Estimate relating to subsequent park
improvements constructed for the Park). Any unrefunded
balance of the Park Development Deposits, including any interest earned thereon, shall be retained by CITY.

Amendment No. I to Agreement No. 15 -070
Belcourt7OaksAckl) evAgrAmend .20151206.07
m

Page 3 of 7 ends

7. City' s Rights and Remedies Upon SUBDIVIDER' s Default. If SUBDIVIDER defaults on its obligations under this Agreement, CITY shall have all rights and remedies available to CITY at law or in equity on account of such default, including the right to retain SUBDIVIDER' s Park Square Deposit and the Park Development Deposits, and the right to require the payment of park
development, improvement and /or enhancement fees as called for in chapter 15. 82 of the Bakersfield Municipal Code as a condition to the further issuance of building permits for residential dwelling units within the Zone of Benefit. In addition to the foregoing, if SUBDIVIDER defaults on its obligation to commence construction of the Park by the Park Commencement Date or to complete construction of the Park by the Park Completion Date, then, in addition to CITY' s other rights and remedies under this Agreement, SUBDIVIDER shall, upon SUBDIVIDER' s receipt of CITY' s written notice of such default and demand for dedication, dedicate the Park property to the CITY for use as a public park site.

8. Satisfaction of Park Dedication and Park Development.

Improvement and Enhancement Requirements. SUBDIVIDER' s completion of the Park Improvements and dedication of the Park, as contemplated in this Agreement shall satisfy all park dedication, development, improvement and enhancement requirements for the full build -out of the Zone of Benefit, including all requirements under chapters 15. 80 and 15. 82 of the Bakersfield Municipal Code, all requirements under section 9. 1 of the Specific Plan, including implementation measures P - 1 through P - 6, inclusive, thereof, and any conditions of approval requiring park dedication,
development, improvement and /or enhancement. Accordingly, except as specified to the contrary in Section 7 above, development within the Zone of Benefit shall be exempt from the provisions of chapter 15. 80 of the Bakersfield Municipal Code pursuant to the provisions of Section 15. 8O. 19O. D thereof, and shall be exempt from the provisions of chapter 15. 82 of the Bakersfield Municipal Code pursuant to the provisions of Section 15.82.O7O. B thereof.

9. No CITY Liability. CITY shall have no liability for failure to collect any park development, improvement and /or enhancement fees specified herein and cannot and does not pledge itself that such moneys will be collected. SUBDIVIDER acknowledges and agrees that except as specified to the contrary in Section 7 above, CITY will not collect park development, improvement and /or Amendment No. I to Agreement No, 15 -070 0AKF9
Belcou07OaksAckDevAgrAmenCJ. 20151206.07

Page 4 of 7 ends

m
0 o

ORIGINAL
enhancement fees from the Zone of Benefit, and accordingly no such fees will be available to reimburse SUBDIVIDER for or in connection with the development of the Park. SUBDIVIDER shall deposit with the CITY Park Development Deposits, and CITY shall refund to SUBDIVIDER SUBDIVIDER' s Park Square Deposit and the Park Development Deposits, as more particularly set forth in Part II, Section 6 above.

Section 3. Part V, Section 17. 1 of Agreement No. 15 -070 is hereby amended to read as follows:

17. 1 This Agreement shall be secured by good and sufficient security, which shall be filed with the CITY prior to commencement of construction. Such improvement security shall consist of security set forth in Bakersfield Municipal Code Chapter 16.32. Any corporate surety bond issued pursuant to Bakersfield Municipal Code Section 16. 32.020 -3 shall substantially conform to the form set forth in Section 66499. 1 of the Map Act or any successor statute.

The Engineer' s Bond Estimate which is attached hereto as Exhibit " E" and incorporated as though fully set forth herein reflects the estimated cost of the various features of the Park Improvements as of March 25, 2015. At or before SUBDIVIDER' s commencement of construction of the Park, SUBDIVIDER shall deliver to CITY, for CITY' s approval, an updated Engineer' s Bond Estimate which reflects the estimated cost of the various features of the Park Improvements as of such time, and such updated Engineer' s Bond Estimate approved by the CITY shall be used, if applicable, as the basis for the reduction of security in connection with the CITY acceptance of Park Improvements, and, if applicable, for the refund of Park Development Deposits to SUBDIVIDER as contemplated in clause (iii) of Section 6. 2. 2. 2 above. In the event SUBDIVIDER elects to construct subsequent improvements for the Park then, following CITY' s approval of such subsequent improvements, and at or before SUBDIVIDER' s commencement of construction of such subsequent improvements, SUBDIVIDER shall deliver to CITY, for CITY' s approval, an Engineer' s Bond Estimate for such subsequent improvements which shall be used, if applicable, as the basis for the reduction of security in connection with the CITY acceptance of such supplemental improvements, and, if applicable, for the refund of Park Development Deposits to SUBDIVIDER as contemplated in clause (iii) of Section 6. 2. 2 above.
o``
AKF9s+.

Amendment No. 1 to Agreement No. 15070
Belcouft70aksAckDevAgrAmend .20151206. 07

Page 5 of 7 ends

Section 4. Part V, Section 34 of Agreement No. 15 -070 is hereby amended to read as follows:

34. ASSIGNMENT. This Agreement shall not be assigned by any party, or any party substituted, without prior written consent of all parties, provided, however, that SUBDIVIDER shall have the right to assign SUBDIVIDER' s rights and delegate SUBDIVIDER' s obligations under this Agreement to Bolthouse Properties, LLC, a California limited liability company or Bolthouse Development Company, LLC, a California limited liability company (in either case, " BOLTHOUSE"), effective upon SUBDIVIDER' s or BOLTHOUSE' s delivery to CITY of written notice of such assignment and delegation, together with a fully executed original of an assignment and assumption agreement duly signed by both SUBDIVIDER and BOLTHOUSE by which SUBDIVIDER assigns to BOLTHOUSE its rights and delegates its obligations under this Agreement, and BOLTHOUSE accepts and assumes such rights and obligations.

Section 4. Except as amended herein, all other provisions of Agreement No. 15 -070 shall remain in full force and effect.

THE REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK.
g PNF9
o s
Amendment No. I to Agreement No. I5-070 .

Belcourt70aksAckDevAgrAmend .20151206. 07
rt'

Page 6 of 7 ends

aRlalrvAl
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. One ( 1) to Agreement No. 15 -070 to be executed the day and year first above written.

CITY"

CITY OF BAKERSFIELD
By:

HARVEY L. HALL
Mayor
APPROVED AS TO CONTENT:

RECREATION AND PARKS DEPARTMENT
REn
By: N+ QVr- t mfiV 0---

DIANNE HOOVER
Recreation and Parks Director
APPROVED AS TO FORM:

VIRGINIA GENNARO
City Attorney
By: C/ ti

RICHARD IGER
Deputy City Attorney
COUNTERSIGNED:

By:

NELSON SMITH
Finance Director
Rl: lsc
Amendment No. 1 to Agreement No. 15 -070
Belcourt7oaksAckDevAgrAmend .20151206.07
SUBDIVIDER"

SIERRA OAKS PARTNERS LLC,
Senior Projects Manager

Page 7 of 7 ends

g AKF9
m
pnIOINAL
Park Fees Paid Report W/Address Data
As of 2025-07-02 13:26:28 Pacific Standard Time/PST • Generated by Rajan Mistry Filtered By
Show: All fees
Date Field: Fee Paid Date equals Custom (3/1/2025 to 6/30/2025) AR Ledger Account Name contains Park
Type Fee Template Name AR Ledger Account Name Permit: Number Total Applicant Name Fee Paid Date Permit: Address Permit: Unit Permit: TRACT NUMBERPermit: TRACT LOT Permit: TRACT PHASE Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0259 $2,095.00 Brianne Brown 3/3/2025 12807 KINNICK COURT 7376 16 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0272 $2,095.00 Brianne Brown 3/3/2025 12719 KINNICK COURT 7376 18 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0273 $2,095.00 Brianne Brown 3/3/2025 12818 KINNICK COURT 7376 13 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0274 $2,095.00 Brianne Brown 3/3/2025 12812 KINNICK COURT 7376 12 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0420 $2,095.00 Brianne Brown 4/9/2025 12815 GRAHAM COURT 7376 30 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0417 $2,095.00 Brianne Brown 4/9/2025 12718 KINNICK COURT 7376 9 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0418 $2,095.00 Brianne Brown 4/9/2025 12809 GRAHAM COURT 7376 31 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0419 $2,095.00 Brianne Brown 4/9/2025 12800 KINNICK COURT 7376 10 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0593 $2,095.00 Brianne Brown 5/6/2025 12820 GRAHAM COURT 7376 29 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0594 $2,095.00 Brianne Brown 5/6/2025 12803 GRAHAM COURT 7376 32 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0595 $2,095.00 Brianne Brown 5/6/2025 12814 GRAHAM COURT 7376 28 3 Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) BLD-RPSP-25-0596 $2,095.00 Brianne Brown 5/6/2025 12808 GRAHAM COURT 7376 27 3 Confidential Information - Do Not Distribute $ 25,140.00 Copyright © 2000-2025 salesforce.com, inc. All rights reserved.

Fee: Number
1997537
1997848
1997866
1997886
2004024
2003965
2003986
2004006
2015473
2015491
2015509
2015527

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Consent- Miscellaneous TO: Honorable Mayor and City Council
FROM: Kevin Albertson, Fire Chief
DATE: July 10, 2025
SUBJECT: Appropriate $20,000 Fire Trust-Hazmat Penalty Funds to the Certified Unified Program Agency (CUPA) Fund Operating Budget for the purchase of new 3-ton package unit and shower upgrade at Fire Station 1.

RECOMMENDATION:

Staff recommends approval of the appropriation.

BACKGROUND:

The Bakersfield Fire Department Fire Prevention Division administers the Certified Unified Program Agency (CUPA), which oversees the regulation of hazardous materials and hazardous wastes within the City of Bakersfield. A special CUPA Trust Fund exists for administering this State-mandated program.

To maintain a safe and functional workspace for our Fire Prevention Division, essential upgrades are planned at Fire Station 1. The current heating and air conditioning unit serving the second floor—where prevention staff operate—has reached the end of its useful life and is no longer repairable. In addition, the current shower facility used by Fire Prevention personnel after emergency responses for decontamination is outdated and requires significant repairs.

Pursuant to Health and Safety Code 25404.1.1(I), funds collected through CUPA enforcement actions and deposited into a designated special account may be expended by the Unified Program Agency for related functions that directly support the Certified Unified Program Agency (CUPA) program.

Staff requests the appropriation of $20,000 Fire Trust Hazmat Penalty Funds to the CUPA Fund operating budget to fund the cost of these improvements.

FISCAL IMPACT:

This project will be provided from the Fire Trust-Hazmat Penalty Account. Penalty account is used for functions in support of the CUPA program.

COUNCIL GOAL:

Innovative and Efficient City Government
ATTACHMENTS:

None

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Consent - PSVS TO: Honorable Mayor and City Council
FROM: Darin Budak, Director of Recreation and Parks
DATE: July 8, 2025
SUBJECT: Amendment No. 4 to Design Build Construction Projects Agreement No. 2021-183 with Playcore Wisconsin DBA Gametime
($1,500,000; revised not to exceed $13,020,182.00 and extend term to August 9, 2026), to provide playground equipment, outdoor fitness equipment, site accessories, surfacing and other related products and services for City parks.

RECOMMENDATION:

Staff recommends approval of the amendment.

BACKGROUND:

On August 4, 2021, Council approved Construction Projects Agreement 2021-183 with Playcore Wisconsin, Inc. DBA Gametime to provide and install playground equipment, outdoor fitness equipment, site accessories, surfacing and other related products and services for a not to exceed amount of $6,235,182.00.

On August 17, 2022, Council approved Amendment No. 1 to Design/Build Constructions Projects Agreement No. 2021-183 increasing the compensation by $1,935,000.00 for total compensation amount not to exceed $8,170,182.00.

On August 09, 2023, Council approved Amendment No. 2 to Construction Projects Agreement 2021-183, adding additional Council approved projects and funds by $1,550,000.00 for a total compensation amount not to exceed $9,720,182.00 and to extend the term of the Agreement by one year.

On April 10, 2024, Council approved Amendment No. 3 to Construction Projects Agreement 2021-183, increasing the compensation by $1,800,0000 for a total compensation amount not to exceed $11,520,182.00 and extending the term of the Agreement through August 9, 2025.

The parties now desire to extend the agreement for one final year through August 9, 2026 and increase the total compensation by $1,500,000.00 with a new not to exceed amount of $13,020,182.00.

FISCAL IMPACT: Funding has been approved by the City Council through the Recreation and Parks Department CIP budget process within the Public Safety and Vital Services Fund and the Capital Outlay Fund.

COUNCIL GOAL:

Community Character & Quality of Life
ATTACHMENTS:

1. Playcore Wisconsin Amend No. 4_Final

2. DocuSign Summary
____________________________________________________
AMENDMENT NO. 4 TO AGREEMENT NO. 2021-183
S:\ADMINISTRATION DIVISION\Agreements\2025\Playcore Gametime Amendment No. 4\Playcore Wisconsin Amend No. 4.doc -- Page 1 of 3 Pages --
AGREEMENT NO.

AMENDMENT NO. FOUR [4] TO

DESIGN/BUILD CONSTRUCTION PROJECTS
AGREEMENT NO. 2021-183
This AMENDMENT NO. 4 TO AGREEMENT NO. 2021-183 is made and entered into on ____________________, by and between the CITY OF BAKERSFIELD, a charter city and a municipal corporation (referred to herein as “CITY”), and PLAYCORE WISCONSIN, INC., DBA GAMETIME, a Wisconsin corporation (referred to herein as “DESIGN/BUILDER”).

R E C I T A L S
WHEREAS, on August 04, 2021, the CITY and DESIGN/BUILDER entered into Construction Projects Agreement No. 2021-183, wherein DESIGN/BUILDER would provide playground equipment, outdoor fitness equipment, site accessories, surfacing and other related products and services in exchange for $6,235,182.00; and WHEREAS, on August 17, 2022, Council approved Amendment No. 1 to Construction Projects Agreement 2021-183 increasing the compensation by $1,935,000.00 for a total compensation amount not to exceed $8,170,182.00; and WHEREAS, on August 09, 2023, Council approved Amendment No. 2 to Construction Projects Agreement 2021-183, adding additional Council approved projects and funds by $1,550,000.00 for a total compensation amount not to exceed $9,720,182.00 and to extend the term of the Agreement by one year; and WHEREAS, on April 10, 2024, Council approved Amendment No. 3 to Construction Projects Agreement 2021-183 increasing the compensation by $1,800,000.00 for a total compensation amount not to exceed $11,520,182.00 and extending the term through August 9, 2025; and
WHEREAS, the parties now desire to enter into Amendment No. 4 to Construction Projects Agreement No. 2021-183, adding additional funds by $1,500,000.00 for a total compensation amount not to exceed $13,020,182.00 and extending the term through August 9, 2026.

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree to amend Construction Projects Agreement No. 2021- 183 as follows:

Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 ____________________________________________________
AMENDMENT NO. 4 TO AGREEMENT NO. 2021-183
S:\ADMINISTRATION DIVISION\Agreements\2025\Playcore Gametime Amendment No. 4\Playcore Wisconsin Amend No. 4.doc -- Page 2 of 3 Pages --

1. Section 2 of Construction Projects Agreement No. 2021-183 entitled “COMPENSATION” is hereby amended to read as follows:

2. COMPENSATION. Compensation for all work, services or products called for under this Agreement shall consist of a total payment not to exceed $13,020,182.00 which shall be paid as follows:

2.1. Upon substantial completion of each individual assigned project as listed in Exhibit C, Exhibit D, and Exhibit E of the agreement, contractor shall invoice each project
individually.

2.2. The compensation set forth in this section shall be the maximum compensation which DESIGN/BUILDER may
receive under this Agreement including, but not limited to, all out-of-pocket costs and taxes. CITY shall pay nothing above the compensation listed unless otherwise agreed to in writing by the parties. Unless otherwise required by State law, a ten percent (10%) retention shall be withheld from payments to DESIGN/BUILDER by CITY. The ten percent
(10%) retention required by the Bakersfield Municipal Code shall be released after the appropriate statutes have
expired and all liens and stop payment notices have been released or otherwise cleared to the satisfaction of the CITY.

2. Section 6 of Construction Projects Agreement No. 2021-183 entitled “TERM” is hereby amended to read as follows:

6. TERM. Unless terminated sooner, as set forth herein, this Agreement shall terminate on August 9, 2026. There are no additional renewal options available.

3. Except as amended herein, all other provisions of Construction Projects Agreement No. 2021-183 shall remain in full force and effect.

IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 4 to Construction Projects Agreement No. 2021-183 to be executed the day and year first above written.
[Signatures on Following Page]
Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 ____________________________________________________
AMENDMENT NO. 4 TO AGREEMENT NO. 2021-183
S:\ADMINISTRATION DIVISION\Agreements\2025\Playcore Gametime Amendment No. 4\Playcore Wisconsin Amend No. 4.doc -- Page 3 of 3 Pages --
“CITY” “DESIGN/BUILDER”
CITY OF BAKERSFIELD PLAYCORE WISCONSIN, INC.,

DBA GAMETIME
By:____________________________ By:_____________________________

KAREN GOH CLINT WHITESIDE
Mayor Manger of Sales Operations
APPROVED AS TO CONTENT:

RECREATION AND PARKS DEPARTMENT
By:____________________________

RICK ANTHONY
Assistant City Manager
Insurance: ____________
APPROVED AS TO FORM:

VIRGINIA GENNARO
City Attorney
By:____________________________

VIRIDIANA GALLARDO-KING
Deputy City Attorney II
COUNTERSIGNED:

By:____________________________

RANDY MCKEEGAN
Finance Director
Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Docusign Envelope ID: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Certificate Of Completion
Envelope Id: 39AAC6D4-DD57-4E5F-93AC-F47E40DE1683 Status: Completed Subject: Complete with Docusign: Playcore Wisconsin Amend No. 4_Final.pdf Source Envelope:

Document Pages: 15 Signatures: 2 Envelope Originator:

Certificate Pages: 5 Initials: 1 City Clerk's Office
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
[email protected]
IP Address: 174.46.226.5
Record Tracking
Status: Original
7/7/2025 12:19:10 PM
Holder: City Clerk's Office
[email protected]
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Bakersfield Location: Docusign Signer Events Signature Timestamp
Clint Whiteside
[email protected]
Director of Sales Administration
PlayCore Wisconsin, Inc., DBA GameTime
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 170.85.56.254
Sent: 7/7/2025 12:21:59 PM
Viewed: 7/7/2025 12:22:48 PM
Signed: 7/7/2025 12:23:17 PM
Electronic Record and Signature Disclosure:

Accepted: 7/21/2022 1:11:01 PM
ID: aa64c428-c086-40cc-b657-257347059262
Rick Anthony
[email protected]
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 174.46.226.5
Sent: 7/7/2025 12:23:18 PM
Viewed: 7/7/2025 12:34:15 PM
Signed: 7/7/2025 12:35:18 PM
Electronic Record and Signature Disclosure:

Accepted: 7/7/2025 12:34:15 PM
ID: 720440cf-a12e-4fd4-93e5-f4475adf931f
Jena Covey
[email protected]

RISK MANAGER
Security Level: Email, Account Authentication
(None) Signature Adoption: Pre-selected Style
Using IP Address: 174.46.226.5
Sent: 7/7/2025 12:35:19 PM
Viewed: 7/7/2025 1:42:37 PM
Signed: 7/7/2025 1:42:47 PM
Electronic Record and Signature Disclosure:

Accepted: 7/7/2025 1:42:37 PM
ID: 8b1f6fe2-2cc5-4ca9-9d63-5396c2731902
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 7/7/2025 12:21:59 PM
Certified Delivered Security Checked 7/7/2025 1:42:37 PM Signing Complete Security Checked 7/7/2025 1:42:47 PM
Completed Security Checked 7/7/2025 1:42:47 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure

ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Bakersfield (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system.

Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below.

Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below.

Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us.

All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/28/2022 10:51:05 AM Parties agreed to: Clint Whiteside, Rick Anthony, Jena Covey Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us.

How to contact City of Bakersfield:

You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows:

To contact us by email send messages to: [email protected] To advise City of Bakersfield of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at [email protected] and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address.

If you created a DocuSign account, you may update it with your new email address through your account preferences.

To request paper copies from City of Bakersfield
To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to [email protected] and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any.

To withdraw your consent with City of Bakersfield
To inform us that you no longer wish to receive future notices and disclosures in electronic format you may:
i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to [email protected] and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process..

Required hardware and software
The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guidesigning-system-requirements.

Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:
 You can access and read this Electronic Record and Signature Disclosure; and  You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and
 Until or unless you notify City of Bakersfield as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Bakersfield during the course of your relationship with City of Bakersfield.

ADMINISTRATIVE REPORT
MEETING DATE: July 23, 2025 AGENDA CATEGORY: Public Hearings TO: Honorable Mayor and City Council
FROM: Matthew S. Collom, Deputy City Attorney
DATE: July 9, 2025
SUBJECT: Mitigated Negative Declaration (MND) pertaining to the consolidation of South Kern and Old River Mutual Water Companies (MWC) into the City of Bakersfield Water System.

RECOMMENDATION:

City Staff, and the Planning Commission, recommend approval of the Mitigated Negative Declaration (“MND”).

BACKGROUND:

This MND is submitted to the City Council for its review and approval in connection to the mandatory consolidation of the Old River Mutual Water Company (“ORMWC”) and the South Kern Mutual Water Company (“SKMWC”). In November 2016, the State Water Resources Control Board (“SWRCB”) order the City of Bakersfield (“City”) to “negotiate consolidation” with ORMWC and SKMWC. In September 2018, SWRCB issued two consolidation orders requiring the City to consolidate both ORMWC and SKMWC into City’s municipal water system (the “Project”). The State of California has collaborated with the City as this Project has progressed. Moreover, the State of California has borne all financial costs associated with this Project
No public comments were received during the designated comment period from April 09, 2025 to May 09, 2025.

ENVIRONMENTAL REVIEW AND PUBLIC NOTIFICATION:

Pursuant to the California Environmental Quality Act (“CEQA”), the City is this Project’s Lead Agency. It determined that preparation of a MND was required for the Project to adequately analyze the potential impacts of the of the Project to the existing environment.

In accord with CEQA section 15082, City, as Lead Agency, filed a Notice of Preparation (“NOP”) with the California Office of Planning and Research (State Clearinghouse) and the Kern County Clerk, to indicate that a MND would be prepared to evaluate the Project’s potential to impact the environment. The NOP was also distributed to potential responsible and trustee agencies and other interested parties for a 30- day public revie period that commenced on April 09, 2025. The purpose of distributing the NOP was to solicit responses to assist the Lead Agency in identifying the full scope and range or potential environmental concerns associated with the Project, so that the issues could be fully examined in the MND.

Effects Found to Have No Impact. Based on the findings of the Initial Study/Notice of Preparation and the results of the scoping process, the Project was determined to have no impact to several subject areas.

The following subject areas were therefore not analyzed by the MND:
 Aesthetics
 Agricultural and Forestry Resources
 Air Quality
 Energy
 Greenhouse Gas Emissions
 Land Use and Planning
 Mineral resources
 Noise
 Population and Housing
 Public Services
 Recreation
 Transportation
 Wildfire
Less Than Significant Impacts (Including Significant Impacts That Can be Mitigated, Avoided, or Substantially Lessened). The MND addresses the Project’s potentially significant environmental impacts identified by the Lead Agency during the Notice of Preparation and scoping process. After further study and environmental review in the MND, it was determined that threshold impacts to the following subject areas would have no impact, be less than significant, and/or could be reduced to a less than significant level with the incorporation of mitigation measures:
 Biological Resources (Mitigation Measure)
 Cultural Resources (Mitigation Measure)
 Geology and Soils (Mitigation Measure)
 Hazards and Hazardous Materials (Mitigation Measure)
 Hydrology and Water Quality (Mitigation Measure)
 Tribal Cultural Resources (Mitigation Measure)
 Utilities and Service Systems
 Mandatory Findings of Significance
Mitigation Monitoring and Reporting Program. The MND contains six (6) mitigation measures that reduce significant impacts from the Project to less than significant levels. Further, a Mitigation Monitoring and Reporting Program (MMRP) has been included within the MND.

Findings.

1. All required public notices have been given. Hearing notices regarding the Project were published in the Bakersfield Californian, a local newspaper of general circulation, 10 days prior to the hearing.

2. The proposed Mitigated Negative Declaration for the Project was submitted to the State Clearinghouse (SCH # 2025040525)and advertised for a 30-day public review period from April 9, 2025 to May 9, 2025.

3. The provisions of CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures have been followed. Staff determined that the proposal is a project under CEQA, and an initial study was completed. A Mitigated Negative Declaration was prepared and properly noticed for public review.

4. A Mitigated Negative Declaration for the Project is the appropriate environmental document to accompany its approval. In accordance with CEQA, staff prepared an initial study and indicated that because mitigation measures relating to those impacts identified in the initial study have been incorporated into the Project, the Project will not significantly impact the physical environment.

Project Objectives. CEQA Guidelines Section 15124(b) requires a statement of Project objectives.

ORMWC and SKMWC currently provide water service to residential and commercial customers located in the community of Old River in unincorporated Kern County. Each MWC operates using a single well located within its respective service area providing water to adjacent parcels and nearby customers.

ORMWC provides water to 46 residents via 14 connections in its 10.7-acre service area. Water is provided by a single well, located within the service area. ORMWC’s well was constructed in 1962 and has a teninch diameter steel casing perforated from 189 to 291 feet below ground surface (bgs). Water delivered by the ORMWC system contained uranium levels exceeding the maximum contaminant level (“MCL”) of 30 micrograms per liter (μg/L) established by State and Federal regulations. Water from this well also exceeds the 1, 2, 3-trichloropropane (TCP) MCL of 0.005 μg/L. ORMWC’s single well lacks source reliability and storage capacity to serve the customers; ORMWC lacks technical, managerial, and financial capacity.

SKMWC provides water to 32 residents via 15 service connections in its 9.7-acre service area. Water is provided by a single well in the northeast corner of its service area. The SKMWC well was constructed in 1959 and has a ten-inch diameter steel casing perforated from 230 to 337 feet bgs. The well currently produces water exceeding the uranium MCL of 30 μg/L. Water from this well also exceeds the 1, 2, 3- TCP MCL of 0.005 μg/L. SKMWC’s single well also lacks source reliability and storage capacity to serve the customers; SKMWC also lacks technical, managerial, and financial capacity.

The proposed Project would abandon the ORMWC well and the SKMWC well and extend the City of Bakersfield’s water system to serve the areas previously served by these two MWCs, thereby consolidating both MWCs into the City of Bakersfield’s water system. Based on water supply information provided by the City and predicted MWC demands, the City has sufficient capacity to service the MWCs.

PLANNING COMMISSION ACTION:

On June 05, 2025, this Project was considered by City’s Planning Commission. No public comments were received at the meeting; no individuals or agencies were present at the hearing that opposed the Project nor its MND.

PUBLIC NOTIFICATION:

Public notice for the proposed Project and environmental determination was advertised in The Bakersfield Californian and posted on the bulletin board in the City of Bakersfield Development Services Building, 1715 Chester Avenue, Bakersfield, California.

Comments Received. No public comments concerning the Project were received from any individual or agency.

Tribal Consultation. On August 01, 2024, in accordance with Senate Bill (SB) 18, the Lead Agency mailed nineteen (19) letters to the below listed tribal entities. City received responses from two (2) tribes listed below; neither tribe requested consultation with City.
• Jairo F. Avila, Tribal Historic Preservation Officer; Fernandeño Tataviam Band of Mission Indians • Jessica Mauck, Director – CRM Department for the San Manuel Band of Mission Indians CONCLUSIONS:

The MND has been finalized, no public comments have been submitted regarding this Project, nor have any groups or individuals voiced their opposition to the MND. City Staff recommend that the City Council approve the MND.

FISCAL IMPACT:

The MND itself is not anticipated to result in any financial costs to the City.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

1. Mitigated Negative Declaration

2. Resolution w/Exhibits

3. Exhibit A. Mitigation Monitoring and Reporting Program

4. Exhibit B. Location Map
- Page 1 of 2 Pages –
RESOLUTION NO. _____________

A RESOLUTION OF THE COUNCIL OF THE CITY OF BAKERSFIELD

ADOPTING A MITIGATED NEGATIVE DECLARATION

PERTAINING TO THE CONSOLIDATION OF OLD RIVER MUTUAL

WATER COMPANY (ORMWC) & SOUTH KERN MUTUAL WATER
COMPANY (SKMWC) INTO CITY OF BAKERSFIELD’S

MUNICIPAL WATER SYSTEM
WHEREAS, pursuant to certain State issued mandatory consolidation orders, the City of Bakersfield intends to consolidate the South Kern and Old River Mutual Water Companies (“MWC”) into the City of Bakersfield Water System AR 6060 Prop l (“Project”) that would allow construction extending the City of Bakersfield's water system to the areas served by the MWCs; and
WHEREAS, an initial study was conducted, and it was determined the Project would not, with implementation of mitigation, have a significant effect on the environment: therefore, a Mitigated Negative Declaration (“MND”) was prepared in accordance with the California Environmental Quality Act (“CEQA”); and
WHEREAS, on June 05, 2025, the Planning Commission recommended adoption of a MND for the Project; and
WHEREAS, the Clerk of the City Council set Wednesday, July 23, 2025 at 5:15 p.m. in the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time and place before the City Council to consider the proposed MND; and
WHEREAS, during the hearing, the City Council considered all facts, testimony, and evidence concerning the staff report, MND and the Planning Commission’s deliberation, and action.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Bakersfield as follows:

1. The above recitals and findings are true and correct and are incorporated herein by reference.

2. The Planning Commission's findings as contained in its Resolution No. 28- 25 are hereby adopted.

3. The MND for the Project is hereby adopted subject to the mitigation measures in Exhibit “A” for the Project located on the map as shown in Exhibit B, both of which are incorporated herein.
---------o0o--------
- Page 2 of 2 Pages -
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by the Council of the City of Bakersfield at a regular meeting thereof held on ______________________________ by the following vote:

AYES: COUNCILMEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER ______________________________________________________________ ABSTAIN: COUNCILMEMBER ______________________________________________________________ ABSENT: COUNCILMEMBER ______________________________________________________________ ________________________________

JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED: _________________
By __________________________
KAREN GOH, Mayor
City of Bakersfield
APPROVED AS TO FORM:

VIRGINIA GENNARO

CITY ATTORNEY
By: ____________________________

MATTHEW COLLOM
Deputy City Attorney
MSC\pt
Attachment: Exhibit A - Mitigation Measures
Exhibit B - Location Map
S:\COUNCIL\Resos\25-26\2025.07.23 - MND Reso.docx
Mitigation Monitoring and Reporting Program for the South Kern and Old River Project

MITIGATION MONITORING AND REPORTING PROGRAM
810-1: Pre~Construction Surveys and Worker Environmental Awareness Training To avoid irppacts to nesting birds, all ground disturbing activity and all vegetation clearing, including f,emoval of trees and shrubs, shall be completed between September 1 and January 3:il, iffeasible.
' If vegetati~n removal and grading activities begin during the nesting season (February 1 to August 31), a qualified biologist shall conduct a pre-construction survey of the project footprint ~or active nests. Additionally, the surrounding 500 feet should be surveyed for active rapior nests, where accessible. A windshield survey for potential Swainson's hawk I nests shall! be conducted within 0.25 mile of the footprint as part of the survey. The preconstructi~n survey shall be conducted within 14 days before the commencement of ground-dis,turbing activities. If the pre-construction survey shows that there is no evidence of active n¢sts, a letter report shall be prepared to document the survey, and no additional measures ~re recommended. If construction does not commence within 14 days of the pre-constr~ction survey, or halts for more than 14 days, an additional survey is required before st~rting work. If active nests are identified, the following measure shall be implemenied:
• A species-specific buffer shall be established by a qualified biologist around active nJsts and no construction activities within the buffer shall be allowed until a I qu:alified biologist has determined that the nest is no longer active (i.e., the n~stlings have fledged and are no longer reliant on the nest, or the nest has failed).

En~roachment into the buffer may occur at the discretion of a qualified biologist.

A~y encroachment into the buffer shall be monitored by a qualified biologist to de~ermine whether nesting birds are being impacted.

A qualified! biologist shall conduct environmental awareness training to all project-related personnel ~efore the initiation of work within the nesting season (February 1-August 31).

CULTURA~RESPURCES
CUL-1: Accidental Discovery of Cultural Resources
In the ev~nt that cultural resources are exposed during ground-disturbing activities, constructi~n activities should be halted within 100 feet of the discovery. Cultural HELIX!
Environmental P'(inning
No more than 14
days prior to the
initiation of project
activities.

Immediately upon
discovery of cultural
resources.

Qualified
Biologist, City of
Bakersfield
Qualified
Archaeologist,
City of
1-3
resources :could consist of but are not limited to stone, bone, wood, or shell artifacts, or features i~cluding hearths, structural remains, or historic dumpsites. If the resources cannot be! avoided during the remainder of construction, an archaeologist who meets the Secretary of the Interior's Professional Qualifications Standards should then be retained, l,n coordination with the City to assess the resource and provide appropriate managem¢nt recommendations. If the discovery proves to be CRHR- or NRHP-eligible, additional! work, such as data recovery excavation, may be warranted and should be discussed }n consultation with the City
CUL-2: Acqidental Discovery of Human Remains
Although ~onsidered highly unlikely, there is always the possibility that ground disturbing activities quring construction may uncover previously unknown human remains. In the event of ~n accidental discovery or recognition of any human remains, PRC Section 5097.98 ~ust be followed. Once project-related earthmoving begins and if there is a discovery pr recognition of human remains, the following steps shall be taken:

1. Th'ere shall be no further excavation or disturbance of the specific location or any n~arby area reasonably suspected to overlie adjacent human remains until the cdunty Coroner is contacted to determine if the remains are Native American and if ~n investigation of the cause of death is required. If the coroner determines the retnains are Native American, the coroner shall contact the NAHC within 24 hours, l ari,d the NAHC shall identify the person or persons it believes to be the "most likely d~scendant" of the deceased Native American. The most likely descendant may m~ke recommendations to the landowner or the person responsible for the ex~avation work, for means of treating or disposing of, with appropriate dignity, th~ human remains, and any associated grave goods as provided in PRC Section 5097.98, or

2. W~ere the following conditions occur, the landowner or their authorized representative shall rebury the Native American human remains and associated gr~ve goods with appropriate dignity either in accordance with the rebommendations of the most likely descendent or on the project area in a I Iodation not subject to further subsurface disturbance: I a. The NAHC is unable to identify a most likely descendent or the most likely descendent failed to make a recommendation within 48 hours HELIX
Environmental ~annlng
Mitigation Monitoring and Reporting Program for the South Kern and Old River Project Immediately upon
discovery of human
remains.

Bakersfield
Qualified
Archaeologist,
Kern County
Coroner, City of
Bakersfield
1-4
after being notified by the commission;
b. The descendent identified fails to make a recommendation; or T~e landowner or his authorized representative rejects the recommendation of th~ descendent, and the mediation by the NAHC fails to provide measures acf~table to the landowner.

GEOLOGYfAND SOILS
GE0-1: Avpid and Minimize Impacts to Paleontological Resources In the eveht paleontological or other geologically sensitive resources {such as fossils or fossil for~ations) are identified during any phase of project construction, all excavations within 100 feet of the find shall be temporarily halted until the find is examined by a qualified paleontologist, in accordance with Society of Vertebrate Paleontology standards.! The paleontologist shall notify the appropriate representative at the City who shall coor~inate with the paleontologist as to any necessary investigation of the find. If the find is determined to be significant under CEQA, the City shall implement those measures !which may include avoidance, preservation in place, or other appropriate measures,i as outlined in Public Resources Code Section 21083.2.

HAZARDS !AND H~A"bOU$ IVIA'F~~l~LS
HAZ-1: Tr~ffic Management Plan
If lane clo~ures or speed restrictions are necessary to allow adequate space for project constructi~>n, a Traffic Management Plan shall be developed for the proposed project to manage tr~ffic during temporary lane closures along Old River Road, SR-119, and Beam Street. The Traffic Management Plan shall be prepared by the applicant and shall be reviewed ~nd approved by the City before the commencement of construction activities.

HYD"OLOGY AND WATER·q.~~l:i'.'fY •
HYD-1: Pr~pare and Implement Dewatering and Shoring Plans In the eve~t that dewatering activities are implemented for any construction activities, a dewaterin~ plan shall be submitted to the City for approval before the issuance of a grading p~rmit. At a minimum, the dewatering plan shall include dewatering methods, location df dewatering activities, equipment, groundwater sampling, disposal, and discharge eoint in accordance with the applicable waste discharge requirements of the Central va;lley Regional Water Quality Control Board. In the event that shoring methods are implemented for any excava!ions, shoring plans shall be prepared and submitted to HELIX
Environmental Planning
Mitigation Monitoring and Reporting Program for the South Kern and Old River Project Prior to the start of
construction.

Prior to
commencement of
construction
activities
Prior to issuance of a
grading permit.

Qualified
Paleontologist,
City of
Bakersfield
Project
Applicant, City
of Bakersfield
City of Union
City Engineering
Division
1-5
the City fd,r approval before the issuance of a grading permit. Shoring activities required for the jack and bore operations to connect utility lines under the Stine Canal shall be I prepared in accordance with the City engineering standards. Additionally, the project applicant ~hall coordinate with the Kern Delta Water District regarding boring under Stine Canal, and any applicable recommendations shall be in,_i:>_lemented.

HELIX
Environmental P(annlng
Mitigation Monitoring and Reporting Program for the South Kern and Old River Project 1-6
HELIX
Environmental Planning
i
Mitigation Monitoring and Reporting Program for the South Kern and Old River Project This page intentionally left blank.
1-7

EXHIBIT B
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System Kern
\;;.;;;;;.;
Barbaro Los_Angeles
~
§-
~ ::;
~
is
!
-E
!
i
-;;:
~
~
~ :~
~
"O
er:
!!!
V)
>
i ( E
,Ii
-E
.,
~ ,
i / ~ 2:
~' l USGS 7.5 Min. Gosford Quad 1 i Township 31S, Range 27E, Section 5 e I a Approximate Location:
~ -119.1086875 35.2652880 l NAO 1983 State Plane CA Zone ~ (US Feet) "O
er:
'-
QJ
>
a:
"O
0 District Blvd
Berkshire Rd
Mccutchen Rd
"O
)
I
Houghton Rd (
~
I hafter Rd
- Approximate Acreage: ±20.35 Acres
;::~-----------~~------------------~--------------~ 0 1 Miles , Source: Base Map Layers (Esri, USGS, NGA, NASA) E--3 E--3 A.

HELIX
Environmental Planning
Site and Vicinity Map
Figure 1
Consolidation of South Kern
and Old River Mutual Water
Companies into the City of
Bakersfield Water System
AR 6060 Prop 1 Project
Final
Initial Study/Mitigated Negative Declaration
May 2025 | Project No. 02632.00014.001
Prepared for:

City of Bakersfield
1715 Chester Ave
Bakersfield, CA 93301
Prepared by:

HELIX Environmental Planning, Inc.
1180 Iron Point Road, Suite 130
Folsom, CA 95630
On behalf of:

Carollo Engineers
1401 Fulton St, Suite 802
Fresno, CA 93721
HELIX Environmental Planning
This page intentionally left blank
i

TABLE OF CONTENTS
Section Page

1.0 INTRODUCTION ..................................................................................................................... 1

1.1 Initial Study Information Sheet........................................................................................... 1

2.0 PROJECT DESCRIPTION........................................................................................................... 3

2.1 Project Location .................................................................................................................. 3

2.2 Project Background............................................................................................................. 3

2.3 Project Components........................................................................................................... 3

2.4 Construction Equipment and Schedule .............................................................................. 4

2.5 Required permits and approvals......................................................................................... 4

3.0 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED.............................................................. 6

3.1 Determination..................................................................................................................... 7

4.0 ENVIRONMENTAL INITIAL STUDY CHECKLIST........................................................................... 8 I. AESTHETICS......................................................................................................................... 9 II. AGRICULTURE AND FORESTRY RESOURCES...................................................................... 11 III. AIR QUALITY...................................................................................................................... 13 IV. BIOLOGICAL RESOURCES .................................................................................................. 24 V. CULTURAL RESOURCES ..................................................................................................... 32 VI. ENERGY ............................................................................................................................. 39 VII. GEOLOGY AND SOILS ........................................................................................................ 41 VIII. GREENHOUSE GAS EMISSIONS ......................................................................................... 46 IX. HAZARDS AND HAZARDOUS MATERIALS.......................................................................... 53 X. HYDROLOGY AND WATER QUALITY.................................................................................. 57 XI. LAND USE AND PLANNING................................................................................................ 63 XII. MINERAL RESOURCES ....................................................................................................... 65 XIII. NOISE ................................................................................................................................ 67 XIV. POPULATION AND HOUSING............................................................................................ 72 XV. PUBLIC SERVICES............................................................................................................... 74 XVI. RECREATION...................................................................................................................... 77 XVII. TRANSPORTATION ............................................................................................................ 79 XVIII. TRIBAL CULTURAL RESOURCES ......................................................................................... 82 XIX. UTILITIES AND SERVICE SYSTEMS ..................................................................................... 86 ii
TABLE OF CONTENTS (cont.)
Section Page
XX. WILDFIRE........................................................................................................................... 89 XXI. MANDATORY FINDINGS OF SIGNIFICANCE....................................................................... 91

5.0 REFERENCES ........................................................................................................................93

6.0 PREPARERS..........................................................................................................................99

LIST OF FIGURES
No. Title Follows Page
1 Regional Location............................................................................................................................. 3 2 Project Location ............................................................................................................................... 3 3 Site Plan ........................................................................................................................................... 5

LIST OF TABLES
No. Title Page
1 San Joaquin Valley Air Basin – Attainment Status.........................................................................15 2 Project Construction Schedule.......................................................................................................18 3 Project Construction Equipment ...................................................................................................18 4 SJVAPCD Air Quality Significance Thresholds ................................................................................20 5 Annual Construction Criteria Pollutant and Precursor Emissions .................................................22 6 California Electricity Sources 2020.................................................................................................39 7 Construction GHG Emissions .........................................................................................................51

LIST OF APPENDICES
A Air Quality and Greenhouse Gas Emissions Letter Report B Biological Resources Technical Letter Report
C Cultural Resources Technical Letter Report
D Roadway Construction Noise Model Outputs
E Mitigation Monitoring and Reporting Plan
iii

ACRONYMS AND ABBREVIATIONS
AB Assembly Bill
APE Area of Potential Effect
bcf billion cubic feet
BMP best management practices
BPS best performance standards
bgs below ground surface
CAA Clean Air Act
CAAQS California Ambient Air Quality Standards
CalEEMod California Emissions Estimator Model
Caltrans California Department of Transportation
CAP Climate Action Plan
CAPCOA California Air Pollution Control Officers Association CARB California Air Resources Board
CBC California Building Code
CDFW California Department of Fish and Wildlife
CEQA California Environmental Quality Act
CH4 methane
CGP Construction General Permit
CO carbon monoxide
CO2 carbon dioxide
CO2e carbon dioxide equivalent
CRHR California Register of Historic Places
CVRWQCB Central Valley Regional Water Quality Control Board dB decibel
dBA A-weighted decibel
DOC California Department of Conservation
DPM diesel particulate matter
DTSC Department of Toxic Substances Control
EO executive order
F Fahrenheit
FEMA Federal Emergency Management Agency
FGC Fish and Game Code
GHG greenhouse gas
GWP global warming potential
HFC hydrofluorocarbons
Hz hertz
iv
ACRONYMS AND ABBREVIATIONS (cont.)
IPCC Intergovernmental Panel on Climate Change
KCFD Kern County Fire Department
KCSO Kern County Sheriff’s Office
KDWD Kern Delta Water District
KRGSA Kern River Groundwater Sustainability Agency
LEQ hourly sound level
LMAX maximum noise level
MBTA Migratory Bird Treaty Act
MCL maximum contaminant level
µg/L micrograms per liter
MLD most likely descendant
MT metric tons
MWC Mutual Water Company
NAHC Native American Heritage Commission
NAAQS National Ambient Air Quality Standards
NOX nitrogen oxides
N2O nitrous oxide
NRCS National Resources Conservation Service
NRHP National Register of Historic Places
NPDES National Pollutant Discharge Elimination System
NSLU Noise-sensitive land use
OEHHA Office of Environmental Health Hazard Assessment
OPR Governor’s Office of Planning and Research
OSHA Occupational Safety and Health Administration
PFC perfluorocarbons
PM10 particulate matter 10 microns or less in diameter
PM2.5 particulate matter 2.5 microns or less in diameter PPV peak particle velocity
PRC Public Resources Code
RCNM roadway construction noise model
ROG reactive organic gas
ROW right-of-way
SF6 sulfur hexafluoride
SHPO State Historic Preservation Officer
SJVAB San Joaquin Valley Air Basin
SJVAPCD San Joaquin Valley Air Pollution Control District v
ACRONYMS AND ABBREVIATIONS (cont.)
SLF Sacred Lands File
SO2 sulfur dioxide
SR State Route
SWPPP Storm Water Pollution Prevention Plan
SWRCB State Water Resources Control Board
TAC toxic air contaminant
TCP trichloropropane
USEPA U.S. Environmental Protection Agency
USFWS U.S. Fish and Wildlife Service
VMT vehicle miles traveled
VOC volatile organic compound
vi
This page intentionally left blank
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 1 1.0 INTRODUCTION

1.1 INITIAL STUDY INFORMATION SHEET

1. Project title: Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water
System Project

2. Lead agency name and address: City of Bakersfield
1000 Buena Vista Rd.

Bakersfield, CA 93311

3. Contact person and phone number: Kristina Budak, P.E.

Water Director
City of Bakersfield
(661) 326-3715

4. Project location: Along Old River Road between McCutchen Road and State Route (SR)-119, as well as in the community of
Old River located southeast of the intersection of
SR-119 and Old River Road

5. General plan designation: Low-density residential; resource-intensive agricultural; general commercial; estate residential;
heavy commercial

6. Zoning: Residential (R-1); Planned Unit Development
(P.U.D.); Exclusive Agriculture (A); Highway
Commercial (CH); General Commercial (C-2);
Medium Density Residential (R-2)

7. Description of project:

Old River Mutual Water Company (MWC) and South Kern MWC provide water service to residential and commercial customers located in the community of Old River in unincorporated Kern County. Each MWC operates using a single well, and both wells produce water that exceeds allowable levels of uranium. Therefore, the proposed project includes the abandonment of the two wells and the extension of the City of Bakersfield’s water system to consolidate both MWCs into the City of Bakersfield’s water system.

The proposed project would involve the construction of approximately 6,000 linear feet of a new 10- inch water main, 1,600 linear feet of 8-inch lateral pipelines, and 29 household connections. Three fire hydrants would also be installed, and two wells would be abandoned as part of the project. The new 16- inch water main would be located within the disturbed portions of Old River Road and SR-119. The proposed 8-inch lateral pipelines and household connections would be located within disturbed portions of Par Street, Beam Street, and front yards of existing residences.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 2 8. Surrounding land uses and setting:

The proposed project is located partially within the City of Bakersfield city limits and partially within unincorporated Kern County. The land adjacent to the proposed project to the west of Old River Road is within the Bakersfield city limits. The land uses in this area are primarily agricultural and residential, with some commercial uses near the intersection of Old River Road and SR-119. The land to the east of Old River Road and to the south of SR-119, including the community of Old River, is located in unincorporated Kern County, and the land uses are primarily agricultural, with some commercial uses near the intersection of SR-119 and Old River Road. Land uses in the community of Old River are primarily residential, with some commercial uses along SR-119. Land surrounding the community of Old River to the north, west, south, and east is primarily used for agricultural purposes, with some commercial uses to the north directly across SR-119. The character of the community and surrounding areas is rural.

9. Other public agencies whose approval is required (e.g., permits, financing approval, or participation agreement):
• State Water Resource Control Board (SWRCB)
• California Air Resources Board (CARB)
• California Department of Fish and Wildlife (CDFW)
• California Department of Public Health
• Native American Heritage Commission (NAHC)
• Office of Historic Preservation
• Kern County
• Kern River Groundwater Sustainability Agency (KRGSA)
• Kern Delta Water District

10. Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code Section 21080.3.1? If so, is there a plan for consultation that includes, for example, the determination of significance of impacts to tribal cultural resources, procedures regarding confidentiality, etc.? On August 1, 2024, letters inviting tribes to consult under Assembly Bill (AB) 52 were sent to the following 15tribes: Big Pine Paiute Tribe of Owens Valley, Chumash Council of Bakersfield, Coastal Band of the Chumash Nation, Fernandeño Tataviam Band of Mission Indians, Kern Valley Indian Community, Kitanemuk & Yowlumne Teion Indians, San Fernando Band of Mission Indians, San Manuel, Band of Mission Indians, Santa Rosa Rancheria Tachi Yokut Tribe, Teion Indian Tribe, Tubatulabals of Kern County, Tule River Indian Tribe, Wuksache Indian Tribe/Eshom Valley Band, and the yak tityu tityu yak tiłhini Northern Chumash Tribe. As of the date of this report, two responses from tribes have been received, neither of which requested consultation. No additional responses or requests for consultation have been received.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 3 2.0 PROJECT DESCRIPTION

2.1 PROJECT LOCATION
The proposed project is located in Kern County southwest of the City of Bakersfield (Figure 1, Regional Location). Old River MWC currently serves an approximately 10.7-acre area at the southeast corner of Old River Road and SR-119 (Taft Highway). South Kern MWC serves an approximately 9.7-acre area east of Old River Road and immediately south of the Old River MWC service area (Figure 2, Mutual Water Company Site Locations). Both service areas are located in unincorporated Kern County, just outside of Bakersfield city limits.

2.2 PROJECT BACKGROUND
Old River MWC and South Kern MWC currently provide water service to residential and commercial customers located in the community of Old River in unincorporated Kern County. Each MWC operates using a single well located within their respective service areas, which provides water to adjacent parcels and nearby customers.

Old River MWC provides water to 46 residents via 14 connections in its 10.7-acre service area. Water is provided by a single well, located within the service area. The Old River MWC well was constructed in 1962 and has a ten-inch diameter steel casing perforated from 189 to 291 feet below ground surface (bgs). Water delivered by the Old River MWC system contains uranium levels that exceed the maximum contaminant level (MCL) of 30 micrograms per liter (µg/L) established by State and federal regulations.

Water from this well also exceeds the 1, 2, 3-trichloropropane (TCP) MCL of 0.005 µg/L. The Old River MWC well lacks source reliability and storage capacity to serve the customers. The MWC also lacks technical, managerial, and financial capacity.

South Kern MWC provides water to 32 residents via 15 service connections in its 9.7-acre service area.

Water is provided by a single well in the northeast corner of the service area. The South Kern MWC well was constructed in 1959 and has a ten-inch diameter steel casing perforated from 230 to 337 feet bgs.

The well currently produces water that exceeds the uranium MCL of 30 µg/L. Water from this well also exceeds the 1, 2, 3- TCP MCL of 0.005 µg/L. The South Kern MWC well also lacks source reliability and storage capacity to serve the customers. The MWC also lacks technical, managerial, and financial capacity.

The proposed project would abandon the Old River MWC well and the South Kern MWC well and extend the City of Bakersfield’s water system to serve the areas previously served by these two MWCs, thereby consolidating both MWCs into the City of Bakersfield’s water system. Based on water supply information provided by the City and predicted MWC demands, the City has sufficient capacity to service the MWCs.

2.3 PROJECT COMPONENTS
Old River MWC and South Kern MWC provide water service to residential and commercial customers.

Each MWC operates using a single well, and both wells produce water that exceeds allowable levels of uranium and 1, 2, 3-TCP. Therefore, the proposed project would abandon the two wells and extend the City of Bakersfield’s water system to consolidate both MWCs into the City of Bakersfield’s water system.

Bakersfield
District Blvd
S Allen Rd
Berkshire Rd
Shafter Rd
Old River Rd Old River Rd
McCutchen Rd
Harris Rd
Houghton Rd
Buena Vista Rd
Panama Ln
Ashe Rd
Gosford Rd
Stine Rd
Figure 1
Site and Vicinity Map
T:\PROJECTS\C\CarolloEngineers_02632\00014_SouthKernOldRiverMunicipalISMND\Map\Map\South Kern Old River MWC.aprx 4/3/2024 Source: Base Map Layers (Esri, USGS, NGA, NASA)
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System Los Angeles
San
Luis
Obispo
Santa
Barbara Ventura
Kern
USGS 7.5 Min. Gosford Quad
Township 31S, Range 27E, Section 5
Approximate Location:
-119.1086875 35.2652880
NAD 1983 State Plane CA Zone V (US Feet)
Approximate Acreage: ±20.35 Acres
0 1 Miles
Old River MWC
South Kern MWC
Project Location
10" Water Main
N
A
H Env,~ Eo Lnme'n!anning
(
I
I
Old River Rd
0 800 Feet
Figure 2
Project Location and Mutual
Water Company Site Locations
T:\PROJECTS\C\CarolloEngineers_02632\00014_SouthKernOldRiverMunicipalISMND\Map\Map\South Kern Old River MWC.aprx 8x11P 4/4/2024 Source: Aerial (Maxar, 2022)
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System Old River Mutual Water Company
South Kern Mutual Water Company
10" Water Main
8" Water Main
CJ
E---3 E---3
HELIX
Environmenta/Planning -------------------------------------------------- Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 4 To extend service from the City of Bakersfield’s water system to the areas currently served by Old River MWC and South Kern MWC, the proposed project would construct approximately 6,000 linear feet of new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines with connections to 29 households.

Three fire hydrants would also be installed for use in case of emergency. The point of connection to the City of Bakersfield’s water system would be the existing 16-inch diameter water main at McCutchen Road and Old River Road (Figure 3, Site Plan). Once the connection to the City of Bakersfield water system is complete, the Old River MWC and the South Kern MWC wells would be abandoned and no longer provide water to the community.

2.4 CONSTRUCTION EQUIPMENT AND SCHEDULE
Project construction is anticipated to begin as early as April 2026 and continue for approximately nine months. Construction of the pipeline would take place within disturbed portions of Old River Road, SR119, Par Street, and Beam Street. Pipeline trench depth is expected to be between four and ten feet, with a total excavation width of five feet. It is anticipated that construction of the pipeline would proceed at a rate of approximately 200 linear feet per day.

During construction, approximately 4,000 cubic yards of soil would be excavated and backfilled once the pipe has been installed. An excavator, trencher, and pipe layer would be used to create a trench and lay pipe within it, as well as trench shoring equipment to keep the trench open while work is being performed. A steel auger would be used to cut through soil as pipe is advanced using trenchless installation for portions of the pipe that would be installed under roads and culverts. Once pipe installation is completed, soil would be backfilled, and a compactor would be used to compact the soil above the pipe. A short portion of the 10-inch pipeline would be installed underneath an existing irrigation canal/culvert using trenchless tunneling and installation of pipe commonly known as “jack and bore”.

In accordance with the City of Bakersfield and Kern County noise ordinances and to minimize disruptions to the local community, construction and equipment maintenance would be limited to between 6:00 a.m. and 9:00 p.m. on weekdays and between 8:00 a.m. and 9:00 p.m. for any work taking place on weekends.

2.5 REQUIRED PERMITS AND APPROVALS
A listing and brief description of the permits and approvals required to implement the proposed project are provided below.

City of Bakersfield
• Consideration of the Environmental Document: The City of Bakersfield will act as the Lead Agency as defined by California Environmental Quality Act (CEQA) and will have authority to determine if the environmental document is adequate under CEQA and State CEQA Guidelines. • Project Approval: The City of Bakersfield will consider approval of the project and entitlements described above.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 5 Agencies
• Kern County: The CEQA environmental document will be posted with Kern County Clerk and State Clearinghouse.
• Central Valley Regional Water Quality Control Board (CVRWQCB): The State Water Resources Control Board, Division of Water Quality, requires that a Construction General Permit be obtained for projects that disturb more than 1 acre of soil. Typical conditions issued with such a permit include the submittal of and adherence to a Stormwater Pollution Prevention Plan (SWPPP), as well as prohibitions on the release of oils, grease, or other hazardous materials during construction. The project applicant and/or construction contractor would be required to file a Notice of Intent with the CVRWQCB.
• California Department of Transportation (Caltrans): An encroachment permit will be required for work performed within the Caltrans rights-of-way.
• Kern Delta Water District (KDWD): An encroachment permit or easement may be required to have the 10-inch line under their canal/within their rights-of-way. • Kern River Groundwater Sustainability Agency (KRGSA): Coordination may be needed with KRGSA as the project is located within KRGSA’s boundaries.

Old River Rd
0 1,200 Feet
Figure 3
Site Plan
T:\PROJECTS\C\CarolloEngineers_02632\00014_SouthKernOldRiverMunicipalISMND\Map\Map\South Kern Old River MWC.aprx Fig3_Site Plan 4/4/2024 Source: Aerial (Maxar, 2022)
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System Fire Hydrant Location
1" Water Main
8" Water Main
Prop. 10" Water Line (Extends up to
McCutchen Rd and Ties-In to Existing 10"
Water Line, approx 1.0 Mile North)
Prop. Trenchless Installations Under Old
River Road, Stine Canal 3-48" Diameter
Culvert, and Taft Hwy 119
Prop. 8" Water Line
Extends in to Old River
MWC Streets
O
dl River Rd
HELIX
Environmental Planning----------------------------------------------------- Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 6 3.0 ENVIRONMENTAL FACTORS POTENTIALLY

AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a “Potentially Significant Impact” or “Less than Significant with Mitigation Incorporated” as indicated by the checklist on the following pages. ☐ Aesthetics ☐ Agriculture and Forestry
Resources
☐ Air Quality
☒ Biological Resources ☒ Cultural Resources ☐ Energy
☒ Geology and Soils ☐ Greenhouse Gas Emissions ☒ Hazards and Hazardous Materials
☒ Hydrology and Water
Quality
☐ Land Use and Planning ☐ Mineral Resources
☐ Noise ☐ Population and Housing ☐ Public Services
☐ Recreation ☐ Transportation ☒ Tribal Cultural Resources ☒ Utilities and Service
Systems
☐ Wildfire ☒ Mandatory Findings of
Significance
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 7 3.1 DETERMINATION
On the basis of this initial evaluation:
☐ I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
☒ I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
☐ I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
☐ I find that the proposed project MAY have a “potentially significant impact” or “potentially significant unless mitigated” impact on the environment, but at least one effect I) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.
☐ I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required.

Signature Date
Printed Name For
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 8 4.0 ENVIRONMENTAL INITIAL STUDY CHECKLIST
The lead agency has defined the column headings in the environmental checklist as follows:

A. “Potentially Significant Impact” is appropriate if there is substantial evidence that an effect may be significant. If there are one or more “Potentially Significant Impact” entries when the determination is made, an EIR is required.

B. “Less Than Significant with Mitigation Incorporated” applies where the inclusion of mitigation measures has reduced an effect from “Potentially Significant Impact” to a “Less Than Significant Impact.” All mitigation measures are described, including a brief explanation of how the measures reduce the effect to a less than significant level. Mitigation measures from earlier analyses may be cross-referenced.

C. “Less Than Significant Impact” applies where the project does not create an impact that exceeds a stated significance threshold.

D. “No Impact” applies where a project does not create an impact in that category. “No Impact” answers do not require an explanation if they are adequately supported by the information sources cited by the lead agency which show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A “No Impact” answer should be explained where it is based on project-specific factors as well as general standards (e.g., the project would not expose sensitive receptors to pollutants, based on a project specific screening analysis).

The explanation of each issue identifies the significance criteria or threshold used to evaluate each question; and the mitigation measure identified, if any, to reduce the impact to less than significance.

Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration [CEQA Guidelines Section 15063(c)(3)(D)]. Where appropriate, the discussion identifies the following:
a) Earlier Analyses Used. Identifies where earlier analyses are available for review. b) Impacts Adequately Addressed. Identifies which effects from the checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and states whether such effects were addressed by mitigation measures based on the earlier analysis.
c) Mitigation Measures. For effects that are “Less Than Significant with Mitigation Incorporated,” describes the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 9 I. AESTHETICS
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Except as provided in Public Resources Code Section 21099, would the project:
a) Have a substantial adverse effect on a scenic vista? ☐ ☐ ☐ ☒ b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
☐ ☐ ☐ ☒
c) Substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
☐ ☐ ☒ ☐
d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the
area?
☐ ☐ ☒ ☐
Environmental Setting
The proposed project is located in unincorporated Kern County immediately south of the city limits of Bakersfield. There are no designated scenic vistas within the City of Bakersfield or in the vicinity of the proposed project. Kern County has three designated scenic highways within the County, but these scenic highways are not located in the vicinity of the project (County 2009). The closest scenic routes in the County are located approximately 70 miles southeast of the project site. The region surrounding the project site is visually characterized by agricultural and rural residential land as well as SR-119. The landform in the area is naturally flat, but parts of it have been leveled for agricultural production.

Impact Analysis
a) Have a substantial adverse effect on a scenic vista? No Impact. The proposed project is located immediately south of the Bakersfield city limits along Old River Road and SR-119. The existing visual environment in the area adjacent to the proposed project is single family residences and agricultural land. The area is not regarded or designated within the Metropolitan Bakersfield General Plan or the Kern County General Plan as visually important or “scenic.” During construction, equipment would be visible in the project area but would be located there temporarily and removed upon completion of construction. The proposed project would install water infrastructure, which would be located entirely underground after construction activities are complete.

Therefore, no permanent changes to scenic vistas would occur due to the proposed project. No impact would occur.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 10 b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
No Impact. The only state designated scenic highway in Kern County is from SR-58 near Mojave to SR395 near Little Lake (Caltrans 2024). The Kern County General Plan describes three scenic highways, which includes SR-14 and SR-395, SR-58 between Mojave and Boron, and five miles of SR-41 in northwestern Kern County. All scenic highways are over 70 miles from the proposed project, and the proposed project would not be visible from any of these highways. As discussed above under question a), permanent project components would be located underground and construction activities that would occur above ground would be temporary in nature. Thus, the proposed project would not result in damage to scenic resources in a state scenic highway, and no impact would occur. c) In non-urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less Than Significant Impact. Public Resources Code 21071 defines the term “urbanized area” for the purposes of CEQA to mean an incorporated city that has a population of at least 100,000 persons or has a population of less than 100,000 persons if the population of that city and not more than two contiguous incorporated cities combined equals at least 100,000 persons. U.S. Census Bureau data from 2020 indicates that the City of Bakersfield has a population of 403,455 persons (U.S. Census Bureau 2024). The project site is located immediately south of the Bakersfield city limits (an urbanized area) and therefore, is evaluated relative to applicable zoning and other regulations governing scenic quality.

Following construction, the proposed project would operate entirely underground and would not be visible to the public nor subject to regulations that govern visual character. The only visible aspect of the proposed project during operation would be three fire hydrants along Par Street, which would be consistent with the residential character of the neighborhood. While installation equipment may be visible during construction, any disruption to the visual character of the area would be temporary in nature. Impacts would be less than significant.
d) Create a new source of substantial light or glare that would adversely affect day or nighttime views in the area?
Less Than Significant Impact. In accordance with the City of Bakersfield and Kern County noise ordinances, construction and maintenance activities for the proposed project will be limited to between the hours of 6:00 a.m. and 9:00 p.m. on weekdays and between 8:00 a.m. and 9:00 p.m. for any work taking place on weekends. Since construction would primarily occur during daylight hours and no major light sources would be required for project operation, no permanent new sources of light would be introduced by the proposed project. Once operational, project components would be located underground and would not be a source of light or glare. Impacts would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 11 II. AGRICULTURE AND FORESTRY RESOURCES
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the
maps prepared pursuant to the Farmland Mapping and
Monitoring Program of the California Resources Agency,
to non-agricultural use?
☐ ☐ ☐ ☒
b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? ☐ ☐ ☐ ☒
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code
Section 12220(g)), timberland (as defined by Public
Resources Code Section 4526), or timberland zoned
Timberland Production (as defined by Government Code
Section 51104(g))?
☐ ☐ ☐ ☒
d) Result in the loss of forest land or conversion of forest land to non-forest use? ☐ ☐ ☐ ☒
e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of
forest land to non- forest use?
☐ ☐ ☐ ☒
Environmental Setting
According to the California Department of Conservation (DOC) Important Farmland Mapper, the project site is mapped as Urban and Built-Up Land (DOC 2024a). The proposed project consists of the installation of a water pipe along Old River Road and into the community of Old River. While there is agricultural land on both sides of Old River Road, installation of the proposed project would take place within the existing road right-of-way (ROW) and would not disturb the adjacent agricultural areas. None of the land adjacent to the project site is under a Williamson Act contract.

Impact Analysis
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use?
b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? No Impact. The project site consists of existing road ROW and land developed for residential and commercial uses. According to the California Important Farmland Finder, land surrounding the proposed project site is designated as Urban and Built-up Land (DOC 2024). While land to the east of Old River Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 12 Road is zoned for agricultural use, none of the areas adjacent to the project site are under Williamson Act contracts. The proposed project would be constructed in existing road ROW and would not disturb adjacent agricultural areas. The proposed project would not convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to a non-agricultural use. No impact would occur for questions a) and b).
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))? No Impact. The project site consists of developed roadways and residential and commercial properties, which are not zoned for or used as forest land, timberland, or timberland zoned Timberland Production.

These uses are not present, and no rezoning would be required. Therefore, no impact would occur. d) Result in the loss of forest land or conversion of forest land to non-forest use? No Impact. The project site consists of developed roadways and properties, which are not used as forest land, timberland, or timberland zoned Timberland Production. Therefore, the proposed project would not result in the conversion of forest land to a non-forest use. No impact would occur. e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
No Impact. As discussed under questions a) through d) above, the project site does not contain agricultural or forest land uses. The proposed project would not result in conversion of these uses, and no impact would occur.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 13 III. AIR QUALITY
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project:
a) Conflict with or obstruct implementation of the applicable air quality plan? ☐ ☐ ☒ ☐
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or state ambient air quality standard?
☐ ☐ ☒ ☐
c) Expose sensitive receptors to substantial pollutant
concentrations? ☐ ☐ ☒ ☐
d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people? ☐ ☐ ☒ ☐ The discussion below is based on an Air Quality and Greenhouse Gas (GHG) Emissions Letter Report prepared by HELIX Environmental Planning, Inc. and attached to this Initial Study as Appendix A.

Environmental Setting
The proposed project is located in unincorporated Kern County, which lies within the San Joaquin Valley Air Basin (SJVAB). Air quality in the SJVAB is regulated by the U.S. Environmental Protection Agency (USEPA) at the federal level, by the California Air Resources Board (CARB) at the State level, and by the San Joaquin Valley Air Pollution Control District (SJVAPCD) at the regional level.

The SJVAB comprises all or part of eight counties: San Joaquin, Stanislaus, Fresno, Merced, Madera, Kings, Tulare, and Kern. The distinctive climate of the SJVAB is determined by its terrain and geographic location. The SJVAB is in the southern half of California’s Central Valley and is 250 miles long and averages 35 miles wide. The SJVAB is bounded by the Sierra Nevada Mountains to the east, the Coast Ranges to the west, the Tehachapi Mountains to the south, and is open to the Sacramento Valley and San Francisco Bay Area to the north.

The SJVAB is in a Mediterranean climate zone which is characterized by typically hot and dry summers and sparse rainfall mainly during the winter. Especially in summer, winds in the SJVAB most frequently blow from the northwesterly direction. The region’s topographic features restrict air movement and channel the air mass towards the southeastern end of the basin. A secondary but significant summer wind pattern is from the southeasterly direction and can be associated with nighttime drainage winds from the Sierra Nevada Mountains, and prefrontal conditions. Many days in the winter are marked by stagnation events where winds are very weak. Transport of pollutants during winter can be very limited.

The vertical dispersion of air pollutants in the SJVAB can be limited by persistent temperature inversions. Temperature inversions that occur on the summer days are usually encountered 2,000 to Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 14 2,500 feet above the valley floor. In winter months, overnight inversions occur 500 to 1,500 feet above the valley floor. The mountains surrounding the basin are mostly above the typical summer height of inversion layers, restricting dispersion of pollutants (SJVAPCD 2015).

Solar radiation and temperature are particularly important in the chemistry of ozone formation. The SJVAB averages over 260 sunny days per year. Generally, the higher the temperature, the more ozone formed, since reaction rates increase with temperature. From 1937 through 2016 annual average maximum daily temperature as measured at the Bakersfield Airport climatic station, approximately 7 miles northeast of the project site, was 77.8 degrees Fahrenheit (°F). The highest monthly average maximum daily temperature (98.6°F) occurs in July, and the lowest monthly average minimum daily temperature (38.5°F) occurs in December and January. The average annual precipitation is approximately 6.2 inches (Western Regional Climate Center 2016).

Regulatory Setting
Criteria Pollutants
Criteria pollutants are defined and regulated by State and federal law as a risk to the health and welfare of the public and are categorized into primary and secondary pollutants. Primary air pollutants are those that are emitted directly from sources, including carbon monoxide (CO); reactive organic gases ([ROGs] also known as volatile organic compounds [VOCs]); 1 nitrogen oxides (NOX); sulfur dioxide (SO2); coarse particulate matter (PM10); fine particulate matter (PM2.5); and lead. Of these primary pollutants, CO, SO2, PM10, PM2.5, and lead are criteria pollutants. ROGs and NOX are criteria pollutant precursors and go on to form secondary criteria pollutants through chemical and photochemical reactions in the atmosphere.

The principal secondary criteria pollutants are ozone and nitrogen dioxide (NO2). In addition to being primary pollutants, PM10 and PM2.5 can be secondary pollutants formed by chemical reactions in the atmosphere.

Ambient air quality is described in terms of compliance with State and national standards, and the levels of air pollutant concentrations considered safe, to protect the public health and welfare. These standards are designed to protect people most sensitive to respiratory distress, such as asthmatics, the elderly, very young children, people already weakened by other disease or illness, and people engaged in strenuous work or exercise. The USEPA has established national ambient air quality standards (NAAQS) for criteria pollutants. As permitted by the Clean Air Act (CAA), California has adopted the more stringent California ambient air quality standards (CAAQS) and expanded the number of regulated air pollutant constituents.

CARB is required to designate areas of the State as in attainment, nonattainment, or unclassified for any State standard. An “attainment” designation for an area signifies that pollutant concentrations do not violate the standard for that pollutant in that area. A “nonattainment” designation indicates that a pollutant concentration violated the standard at least once.

The project site is located in unincorporated Kern County that lies within the SJVAB and, as such, is in an area designated as “nonattainment” for certain pollutants that are regulated under the CAA. Table 1, San Joaquin Valley Air Basin – Attainment Status, lists the federal and State attainment status of the 1 CARB defines and uses the term ROGs while the USEPA defines and uses the term VOCs. The compounds included in the lists of ROGs and VOCs and the methods of calculation are slightly different. However, for the purposes of estimating criteria pollutant precursor emissions, the two terms are often used interchangeably.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 15 SJVAB (including Kern County and the project site) for the NAAQS and CAAQS. As shown in Table 1, the SJVAB is designated as attainment for PM10; attainment/unclassified for CO, NO2, SO2; extreme nonattainment for 8-hour ozone; and nonattainment for PM2.5 with respect to the NAAQS. The SJVAB is designated as attainment for CO, NO2, SO2, and lead; severe nonattainment for 1-hour ozone; and as nonattainment for 8-hour ozone, PM2.5, and PM10 with respect to the CAAQS (SJVAPCD 2024a).

Table 1
SAN JOAQUIN VALLEY AIR BASIN – ATTAINMENT STATUS
Pollutant Federal Standards State Standards
Ozone – One hour No Federal Standard Nonattainment/Severe Ozone – Eight hour Nonattainment/Extreme Nonattainment
PM10 Attainment Nonattainment
PM2.5 Nonattainment Nonattainment
CO Attainment/Unclassified Attainment/Unclassified
NO2 Attainment/Unclassified Attainment
SO2 Attainment/Unclassified Attainment
Lead (Particulate) No Designation/Unclassified Attainment Hydrogen Sulfide No Federal Standard Unclassified
Sulfates No Federal Standard Attainment
Visibility Reducing Particles No Federal Standard Unclassified Vinyl Chloride No Federal Standard Attainment
Source: SJVAPCD 2024a
Toxic Air Contaminants
The Health and Safety Code (§39655, subd. (a).) defines a toxic air contaminant (TAC) as “an air pollutant which may cause or contribute to an increase in mortality or in serious illness, or which may pose a present or potential hazard to human health.” A substance that is listed as a hazardous air pollutant pursuant to subsection (b) of Section 112 of the Federal CAA (42 United States Code Section 7412[b]) is a TAC. Under State law, the California Environmental Protection Agency, acting through CARB, is authorized to identify a substance as a TAC if it determines the substance is an air pollutant that may cause or contribute to an increase in mortality or an increase in serious illness, or that may pose a present or potential hazard to human health.

Diesel engines emit a complex mixture of air pollutants, including both gaseous and solid material. The solid material in diesel exhaust is referred to as diesel particulate matter (DPM). Almost all DPM is 10 microns or less in diameter, and 90 percent of DPM is less than 2.5 microns in diameter (CARB 2024).

Because of their extremely small size, these particles can be inhaled and eventually trapped in the bronchial and alveolar regions of the lung. In 1998, CARB identified DPM as a TAC based on published evidence of a relationship between diesel exhaust exposure and lung cancer and other adverse health effects. DPM has a notable effect on California’s population—it is estimated that about 70 percent of total known cancer risk related to air toxins in California is attributable to DPM (CARB 2024).

San Joaquin Valley Air Pollution Control District
The proposed project is located in unincorporated Kern County, which lies within the SJVAB. Air quality in the SJVAB is regulated by the USEPA at the federal level, by the CARB at the state level, and by SJVAPCD at the regional level. As a regional agency, the SJVAPCD works directly with local governments I I
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 16 and cooperates actively with all federal and State government agencies. The SJVAPCD develops rules and regulations; establishes permitting requirements for stationary sources; inspects emissions sources; and enforces such measures through educational programs or fines, when necessary.

Air Quality Plans
The SJVAPCD has developed plans to attain State and federal standards for ozone and particulate matter. The SJVAPCD’s air quality plans include emissions inventories to measure the sources of air pollutants, to evaluate how well different control methods have worked, and to show how air pollution will be reduced. The plans also use computer modeling to estimate future levels of pollution and make sure that the San Joaquin Valley will meet air quality goals. 1-Hour Ozone Plan – Although the USEPA revoked its 1979 1-hour ozone standard in June 2005, many planning requirements remain in place, and the SJVAB must still attain this standard before it can rescind CAA Section 185 fees. The SJVAPCD’s 2013 Plan for the Revoked 1-hour Ozone Standard demonstrated attainment of the 1-hour ozone standard by 2017 (SJVAPCD 2015). On July 18, 2016, the USEPA published in the Federal Register the final action to determine that the SJVAB has attained the 1- hour ozone standard (USEPA 2016). On June 15, 2023, the SJVAPCD adopted the 2023 Maintenance Plan and Redesignation Request for the Revoked 1-hour Ozone Standard that includes provisions for a maintenance plan and requirements for meeting all five criteria of Section 107(d)(3)(E) of the CAA (SJVAPCD 2023).
8-Hour Ozone Plan – The SJVAPCD’s 2007 Ozone Plan demonstrates attainment of the 1997 NAAQS 8- hour ozone standard by 2023. The USEPA approved the 2007 Ozone Plan effective April 30, 2012. (SJVAPCD 2015). In June 2016, the SJVAPCD adopted the 2016 Plan for the 2008 8-Hour Ozone Standard to map strategies for attainment of the updated NAAQS 8-hour ozone standard (SJVAPCD 2016a). The SJVAPCD adopted the 2022 Plan for the 2015 8-Hour Ozone Standard in December 2022. This Plan satisfies Clean Air Act requirements and ensures expeditious attainment of the 70 parts per billion 8- hour ozone standard (SJVAPCD 2022). On April 24, 2024, the SJVAPCD adopted the Ozone Contingency State Implementation Plan Revision for the 2008 and 2015 8-Hour Ozone Standards to address the contingency provisions for the 2008 and 2015 8-hour ozone standards (SJVAPCD 2024b).

PM10 Plan – Based on PM10 measurements from 2003-2006, USEPA found that the SJVAB has reached Federal PM10 standards. On September 21, 2007, the SJVAPCD adopted the 2007 PM10 Maintenance Plan and Request for Redesignation. On September 25, 2008, the SJVAB was redesignated to attainment/maintenance (SJVAPCD 2015).

PM2.5 Plan – The SJVAPCD’s 2008 PM2.5 Plan demonstrated 2014 attainment of USEPA’s first PM2.5 standard, set in 1997. The USEPA lowered the PM2.5 standard in 2006, and the SJVAPCD’s 2012 PM2.5 Plan showed attainment of this standard by 2019, with the majority of the SJVAB seeing attainment much sooner (SJVAPCD 2015). The SJVAPCD adopted the 2016 Moderate Area Plan for the 2012 PM2.5 Standard on September 15, 2016. This plan addresses the updated NAAQS 2012 annual PM2.5 standard and includes an attainment impracticability demonstration and request for reclassification of the SJVAB from moderate nonattainment to serious nonattainment (SJVAPCD 2016b). These plans came together when the SJVAPCD adopted the 2018 Plan for the 1997, 2006, and 2012 PM2.5 Standards on November 15, 2018. This plan addresses the federal standards for each of those years (SJVAPCD 2018).

The SJVAPCD adopted the 2024 Plan for the 2012 Annual PM2.5 Standard on June 20, 2024, to fulfill the remaining CAA requirements, including the final modeling analysis, attainment strategy and emission Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 17 reduction commitments, reasonable further progress/quantitative milestones, and contingency measures. This Plan demonstrates expeditious attainment of the 2012 PM2.5 standard by 2030 (SJVAPCD 2024c).

Rules and Regulations
The following rules promulgated by the SJVAPCD would be applicable to construction of the proposed project (SJVAPCD 2024d):

Rule 4101 Visible Emissions: prohibit the emissions of visible air contaminants to the atmosphere.

Rule 4102 Nuisance: protect the health and safety of the public.

Rule 8021 Construction, Demolition, Excavation, Extraction, and other Earth Moving Activities: limit fugitive dust emissions from construction, demolition, excavation, extraction, and other earthmoving activities.

Sensitive Receptors
CARB and the Office of Environmental Health Hazard Assessment (OEHHA) have identified the following groups of individuals as the most likely to be affected by air pollution: adults over 65, children under 14, infants (including in utero in the third trimester of pregnancy), and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis (CARB 2005; OEHHA 2015).

Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved and are referred to as sensitive receptors. Examples of these sensitive receptors are residences, schools, hospitals, and daycare centers.

The closest existing sensitive receptors to the project site are single-family residential homes located 50- feet from the proposed water mains. The closest school is Independence High School located approximately 350 feet northwest of the northern terminus of the proposed 10-inch water main along Old River Road.

Methodology and Assumptions
Criteria pollutant and precursor emissions, and GHG emissions for the proposed project construction activities were calculated using the California Emissions Estimator Model (CalEEMod), Version 2022.1.

CalEEMod is a Statewide land use emissions computer model designed to provide a uniform platform for government agencies, land use planners, and environmental professionals to quantify potential criteria pollutant emissions associated with both construction and operations from a variety of land use projects. The model was developed for the California Air Pollution Control Officers Association (CAPCOA) in collaboration with the California air districts. CalEEMod allows for the use of default data (e.g., emission factors, trip lengths, meteorology, source inventory) provided by the various California air districts to account for local requirements and conditions, and/or user-defined inputs. The model calculates emissions of criteria pollutants, ozone precursors, and GHGs, including PM10, PM2.5, ROGs, NOX, and CO2e. The calculation methodology and input data used in CalEEMod can be found in the CalEEMod User’s Guide Appendices C, D, and G (CAPCOA 2022). The input data and subsequent construction emission estimates for the proposed project are discussed below. The CalEEMod output files are included in Attachment B to Appendix A.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 18 Construction Assumptions
As described above, construction emissions were estimated using CalEEMod. Construction input data for CalEEMod include, but are not limited to, (1) the anticipated start and finish dates of construction activity; (2) inventories of construction equipment to be used; (3) areas to be excavated and graded; and (4) volumes of materials to be exported from and imported to the project area.

Construction of the proposed project is anticipated to begin April 1, 2026, and be completed on December 31, 2026. Most of the pipeline would be installed using convention trenching, commonly known as “cut-and-cover”. A short portion of the 10-inch pipeline would be installed underneath an existing irrigation canal/culvert using trenchless tunneling and installation of pipe commonly known as “jack and bore”. The total 1.4-acre disturbed area was estimated based on information provided by the project engineer, and it was assumed that the total paved area would be 100 percent asphalt. The construction activity schedule was provided by the project engineer and is outlined in Table 2, Project Construction Schedule, below. It was assumed that all construction activities would occur concurrently.

Table 2

PROJECT CONSTRUCTION SCHEDULE
Construction Activity Construction Start Date Construction End Date Number of Working Days Pavement Demolition 4/1/2026 12/31/2026 197
Trenching-Cut 4/1/2026 12/31/2026 197
Trenching-Cover 4/1/2026 12/31/2026 197
Pipeline Installation 4/1/2026 12/31/2026 197
Pavement Repair 4/1/2026 12/31/2026 197
Jack and Bore Preparation 7/1/2026 7/2/2026 2
Jack and Bore 7/3/2026 7/9/2026 5
Jack and Bore Cleanup 7/10/2026 7/13/2026 2
Restriping 12/1/2026 12/5/2026 4
Source: CalEEMod Output (Attachment B to Appendix A)
Construction equipment for each construction activity was provided by the project engineer and was based on CalEEMod defaults. Table 3, Project Construction Equipment, below, presents a summary of the assumed equipment that would be involved in each activity of construction. For this project, a crawler tractor is a Caterpillar PL61 Pipelayer and an off-highway truck is a water truck.

Table 3

PROJECT CONSTRUCTION EQUIPMENT
Construction Activity Equipment Number
Pavement Demolition Tractors/Loaders/Backhoes 2
Concrete/Industrial Saws 2
Off-Highway Trucks 1
Trenching-Cut Excavators 2
Trenching-Cover Tractors/Loaders/Backhoes 2
Rollers 2
Pipeline Installation Crawler Tractors 2
Pavement Repair Tractors/Loaders/Backhoes 2
Pavers 2
Rollers 2
I I
I I
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 19 Construction Activity Equipment Number
Jack and Bore Preparation Excavators 1
Skid Steer Loaders 1
Tractors/Loaders/Backhoes 1
Jack and Bore Bore/Drill Rigs 1
Excavators 1
Pumps 1
Jack and Bore Cleanup Skid Steer Loaders 1
Tractors/Loaders/Backhoes 1
Restriping Air Compressors 2
Source: CalEEMod Output (Attachment B to Appendix A)
Per the project engineer, 210 tons of old asphalt would be exported during pavement demolition.

Emissions calculations assume application of water during pavement demolition and a 15 miles per hour (mph) speed limit on unpaved surfaces in compliance with SJVAPCD Rule 8021, Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities.

Construction trips were estimated based on information provided by the project engineer and CalEEMod defaults. It was assumed that the proposed project would require five, one-way worker trips per day and one, one-way vendor trip per day for installation of the pipeline. It was also assumed that the proposed project would require one, one-way truckload per day for pavement imports and two, one-way worker trips per day for restriping.

Operational Assumptions
Operation of the proposed project would not result in a population increase and would not generate new vehicle trips beyond occasional maintenance activities. Operation of the proposed project would not require new backup pumps or backup generators. Therefore, changes in project operational emissions would be negligible compared to operational emissions from the existing water systems.

Therefore, project operational emissions were not quantified.

Standards of Significance
According to Appendix G of the State CEQA Guidelines, a project would have a significant air quality environmental impact if it would:

1. Conflict with or obstruct implementation of the applicable air quality plan; or

2. Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or State ambient air quality standard; or

3. Expose sensitive receptors to substantial pollutant concentrations; or

4. Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.

Appendix G of the State CEQA Guidelines states that the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the above determinations. The SJVAPCD has established significant thresholds to assess the impacts of projectrelated air pollutant emissions. The significance thresholds are updated, as needed, to appropriately I I
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 20 represent the most current technical information and attainment status in the SJVAB. Table 4, SJVAPCD Air Quality Significance Thresholds, presents the most current significance thresholds, including thresholds for construction and operational emissions and maximum incremental cancer risk and hazard indices for TACs. A project with emission rates and risk values below these thresholds is generally considered to have a less than significant impact on air quality.

Table 4

SJVAPCD AIR QUALITY SIGNIFICANCE THRESHOLDS
Mass Daily Thresholds (tons per year)
Pollutant Construction Operation
ROG 10 10
NOX 10 10
CO 100 100
PM10 15 15
PM2.5 15 15
SOX 27 27
Toxic Air Contaminants
TACs Maximum Incremental Cancer Risk ≥ 10 in 1 million
Chronic & Acute Hazard Index ≥ 1.0 (project increment)
Source: SJVAPCD 2015
ROG: reactive organic gas; NOx: nitrogen oxides; CO: carbon monoxide; PM10: coarse particulate matter with a diameter of 10 microns or less; PM2.5: fine particulate matter with a diameter of 2.5 microns or less; SOX: sulfur oxides; TACs: toxic air contaminants; NO2: nitrogen dioxide; ppm: parts per million; µg/m3: micrograms per cubic meter.

As set forth in the SJVAPCD Guidance for Assessing and Mitigating Air Quality Impacts, any proposed project that would individually have a significant air quality impact would also be considered to have a significant cumulative air quality impact. Impacts of local pollutants (CO, TACs) are cumulatively significant when modeling shows that the combined emissions from the project and other existing and planned projects would exceed air quality standards.

Impact Analysis
a) Conflict with or obstruct implementation of the applicable air quality plan? Less Than Significant Impact. The SJVAPCD has established thresholds of significance for a project’s criteria pollutant and precursor emissions for both temporary construction-related emissions and longterm operational-related emissions, which are shown above in Table 4. According to the SJVAPCD, these significant thresholds have been established to assist lead agencies in determining whether a project may have a significant air quality impact. A project with emissions lower than the thresholds would not conflict with or obstruct implementation of the district’s air quality plans for attainment of the applicable NAAQS and CAAQS (SJVAPCD 2015). As discussed below, the proposed project would not exceed the temporary construction-related thresholds of significance for criteria pollutants and precursor emissions. Additionally, the proposed project would not result in a population increase and would not generate new vehicle trips, and occasional project maintenance activities would be similar to maintenance activated for the exiting water systems. Operation of the proposed project would not require new pumps or backup generators. Therefore, operational emissions would be negligible.

I I
I I
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 21 In addition, control measures in the air quality plans adopted by the SJVAPCD are based in part on growth projections in local planning documents such as the County and City General Plans. The proposed project would not require a change of General Plan land use designation, and the proposed project would not result in population or employment growth in the County or City. Therefore, the proposed project would not conflict with or obstruct implementation of the applicable air quality plans, and the impact would be less than significant.
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non- attainment under an applicable federal or state ambient air quality standard? Less Than Significant Impact. The SJVAB is designated as attainment for PM10; attainment/unclassified for CO, NO2, SO2; extreme nonattainment for 8-hour ozone; and in nonattainment for PM2.5 with respect to federal air quality standards. The SJVAB is designated as attainment for CO, NO2, SO2, and lead; severe nonattainment for 1-hour ozone; and as nonattainment for 8-hour ozone, PM2.5, and PM10 with respect to State air quality standards. The proposed project’s emissions of these criteria pollutants and precursors during construction and operation are evaluated below.

Construction Emissions
CalEEMod was used to quantify project-generated construction emissions, as discussed in Methodology and Assumptions, above. The model output sheets are included in Attachment B of Appendix A.

Construction of the proposed project is anticipated to start April 1, 2026, and be completed on December 31, 2026. The quantity, duration, and intensity of construction activity influence the amount of construction emissions and related pollutant concentrations that occur at any one time. As such, the emission forecasts provided herein reflect a specific set of conservative assumptions based on the expected construction scenario wherein a relatively large amount of construction activity is occurring in a relatively intensive manner. Because of this conservative assumption, actual emissions could be less than those forecasted. If construction is delayed or occurs over a longer time period, emissions could be reduced because of: (1) a more modern and cleaner-burning construction equipment fleet mix than assumed in CalEEMod; and/or (2) a less intensive buildout schedule (i.e., fewer daily emissions occurring over a longer time interval).

The proposed project’s construction period emissions of ROG, NOX, CO, SOX, PM10, and PM2.5 were compared to the SJVAPCD construction thresholds in Table 5, Annual Construction Criteria Pollutant and Precursor Emissions. Table 4 presents the most current significance thresholds, including thresholds for construction and operational emissions and maximum incremental cancer risk and hazard indices for TACs. As shown in Table 5, the proposed project’s construction period emissions of ROG, NOX, CO, SOX, PM10, and PM2.5 would not exceed the SJVAPCD thresholds. Therefore, impacts related to constructiongenerated emissions of ROG, NOX, CO, SOX, PM10, and PM2.5 would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 22 Table 5

ANNUAL CONSTRUCTION CRITERIA POLLUTANT AND PRECURSOR EMISSIONS Construction Activities Pollutant Emissions (tons per year) ROG NOX CO SOX PM10 PM2.5
Pavement Demolition, Trenching-Cut,
Trenching-Cover, Pipeline Installation,
Pavement Repair, Jack and Bore
Preparation, Jack and Bore, Jack and
Bore Cleanup, Restriping

0.30 2.37 3.55 0.01 0.23 0.11
SJVAPCD Threshold 10 10 100 27 15 15
Significant Impact? No No No No No No
Source: CalEEMod (output data is provided in Attachment B to Appendix A).

Operational Emissions
As discussed in Methodology and Assumptions, operational emissions were not quantified. Operation of the proposed project would not result in a population increase and would not generate new vehicle trips, and occasional project maintenance activities would be similar to maintenance activated for the exiting water systems. Operation of the proposed project would not require new pumps or backup generators. Therefore, operational emissions would be negligible, and the impact would be less than significant.

Impact Conclusion
Construction and operation of the proposed project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment, and the impact would be less than significant.
c) Expose sensitive receptors to substantial pollutant concentrations? Less Than Significant Impact. As discussed in Sensitive Receptors, the closest existing sensitive receptors to the project site are single-family residential homes located 50-feet from the proposed water laterals in the Old River community. The closest school is Independence High School, which is located approximately 350 feet northwest of the northern terminus of the proposed 10-inch water main along Old River Road.

The dose (of TAC) to which receptors are exposed is the primary factor used to determine health risk.

Dose is a function of the concentration of a substance in the environment and the extent of exposure a person has to the substance; a longer exposure period to a fixed quantity of emissions would result in higher health risks. Current models and methodologies for conducting cancer health risk assessments are associated with longer-term exposure periods (typically 30 years for individual residents based on guidance from OEHHA) and are best suited for evaluation of long-duration TAC emissions with predictable schedules and locations. These assessment models and methodologies do not correlate well with the temporary and highly variable nature of construction activities. Cancer potency factors are based on animal lifetime studies or worker studies where there is long-term exposure to the carcinogenic agent. There is considerable uncertainty in trying to evaluate the cancer risk from projects that will only last a small fraction of a lifetime (OEHHA 2015). Concentrations of mobile source DPM emissions disperse rapidly and are typically reduced by 70 percent at approximately 500 feet (CARB I I I
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 23 2005). Considering the highly dispersive nature of DPM and the fact that construction activities would occur for short durations at various locations in the project area, it is not anticipated that construction of the proposed project would expose sensitive receptors to substantial DPM concentrations.

The use of diesel-powered equipment for occasional project operational maintenance would be similar maintenance equipment use for the existing water system. Operation of the proposed project would not require the use of new stationary sources of TACs, such as backup generators. Therefore, construction and operation of the proposed project would not expose sensitive receptors to substantial pollutant concentrations, and the impact would be less than significant. d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Less Than Significant Impact. The proposed project could produce odors during construction activities as a result of heavy diesel equipment exhaust and VOC released during application of asphalt. The odor of these emissions is objectionable to some; however, emissions would disperse rapidly from the project site and therefore should not be at a level that would affect a substantial number of people. Any odors emitted during construction activities would be temporary, short-term, and intermittent in nature, and would cease at the end of project construction. As a result, impacts associated with temporary odors during construction are not considered significant.

The SJVAPCD has developed screening distances for common sources of operational odors, including Wastewater Treatment Facility; Sanitary Landfill; Transfer Station; Composting Facility; Petroleum Refinery; Asphalt Batch Plant; Chemical Manufacturing; Fiberglass Manufacturing; Painting/Coating Operations (e.g., auto body shops); Food Processing Facility; Feed Lot/Dairy; and Rendering Plant (SJVAPCD 2015a). As the proposed project would install water pipelines and fire hydrants, operation of the proposed project would not result in odors affecting a substantial number of people.

Neither construction nor operation of the proposed project would result in other emissions (such as those leading to odors) adversely affecting a substantial number of people, and the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 24 IV. BIOLOGICAL RESOURCES
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the
California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
☐ ☒ ☐ ☐
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the California Department of Fish and Wildlife or US Fish and Wildlife Service?
☐ ☐ ☐ ☒
c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
☐ ☐ ☐ ☒
d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with
established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
☐ ☐ ☐ ☒
e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
☐ ☐ ☐ ☒
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation
Plan, or other approved local, regional, or state habitat conservation plan?
☐ ☐ ☒ ☐
The discussion below is based on a Biological Resources Technical Letter Report prepared by HELIX Environmental Planning, Inc. and attached to this Initial Study as Appendix B.

Environmental Setting
The approximately 27-acre project site is comprised of a developed agricultural road corridor and a small rural community. Several houses and paved roads are found throughout the project site as well as barren areas. Agricultural uses along the road corridor support orchards, annual crops, and some fallowed lands. Based on historical aerial imagery, the project site has been primarily an agricultural community since at least 1952 with the current neighborhood complex served by both water districts having been built between 1956 and 1968 (NETR 2024).

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 25 Soils
The Natural Resources Conservation Service (NRCS) has mapped three soil units within the project site:

Granoso sandy loam, 0 to 2 percent slopes, overwash; Kimberlina fine sandy loam, 0 to 2 percent slopes MLRA 17; and Bakersfield fine sandy loam, drained, 0 to 1 percent slopes (NRCS 2024). These soil types are briefly discussed below.

Granoso sandy loam, 0 to 2 percent slopes, overwash has a parent material of alluvium derived from mixed rock sources. A typical soil profile is sandy loam (0 - 10 inches), loamy sand (10 - 20 inches) then sand (20 - 62 inches). This soil is somewhat excessively drained, has a very low runoff class, a rare frequency of flooding, and no frequency of ponding.

Kimberlina fine sandy loam, 0 to 2 percent slopes MLRA 17 has a parent material of alluvium derived from igneous and sedimentary rock. A typical soil profile is fine sandy loam (0 - 45 inches) and silt loam (45 - 71 inches). This soil is well drained, has a very low runoff class, a rare frequency of flooding, and no frequency of ponding.

Bakersfield fine sandy loam, drained, 0 to 1 percent slopes has a parent material of alluvium derived from granitoid rock. A typical soil profile is fine sandy loam (0 - 16 inches), stratified sand to loam (19 - 45 inches), loam (45 - 51 inches), stratified sandy loam to silt loam (51 – 58 inches), and stratified sand to loam (58 - 66 inches). This soil is somewhat poorly drained, has a negligible class, a rare frequency of flooding, and no frequency of ponding.

Habitat Types
Vegetation communities within the project site include ruderal, barren, and urban. These communities are described in more detail below.

Ruderal. Ruderal habitat is land that retains a soil substrate but is subject to recent or on-going disturbance that prevents the formation of natural vegetation communities. Vegetation in ruderal areas is dominated by naturalized and/or invasive non-native species and ruderal native annuals. The species composition is determined by local colonization potential or past introductions. Ruderal habitat on the project site is dominated by a variety of non-native herbs and forbs, including black mustard (Brassica nigra), puncturevine (Tribulus terrestris), and medusa head (Elymus caput-medusae) as well as nonnative shrubs such as big saltbush (Atriplex lentiformis). Approximately 0.54 acre of the project site is composed of ruderal habitat and is present along the borders of fallowed farmlands.

Barren. Barren habitat is defined by its absence of vegetation. Approximately 1.94 acres of the project site is barren and has been stripped of vegetation along roadsides and the margins of agricultural operations. The barren areas found within the project site did not show signs of mammal burrows that may serve as suitable habitat for special-status wildlife and nesting birds.

Urban. Urban habitat is land that has been modified for human use and vegetation communities are those planted for aesthetic purposes, unmaintained areas will be colonized by similar vegetation as found in ruderal habitats. Urban habitat found within the project site includes the roads within the project site and the communities served by the Old River MWC and South Kern MWC. Ornamental trees found throughout this habitat include fruitless mulberry (Morus alba), Italian cypress (Cupressus sempervirens), and California black walnut (Juglans californica). Approximately 24.61 acres of the project Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 26 site was classified as Urban. Ornamental trees found within the neighborhood complex may serve as suitable habitat for nesting birds.

Methodology
The section below outlines the survey objectives and methodology for determining potential impacts to biological resources associated with the proposed project.

Analysis Objectives
• Identify and describe the vegetation communities in the project site; • Evaluate and identify sensitive biological resources and special-status plant and animal species that could occur on the project site or be affected by any project-related activities, and; • Provide conclusions and recommendations for surveys or permits that may be required before site development.

Database Queries
HELIX conducted a review of special-status species records for the Lamontolor, Gosford, Oil Center, Oildale, Rosedale, Stevens, Weed Patch, Conner, and Millux, California, U.S. Geological Survey (USGS)

7.5-minute quadrangles (quad) from the following databases:
• U.S. Fish and Wildlife Service IPaC (USFWS 2024);
• CDFW California Natural Diversity Database (CNDDB) (CDFW 2024); • California Native Plant Society (CNPS) Inventory of Rare and Endangered Plants (CNPS 2024); • National Wetlands Inventory (NWI); and
• NRCS.

Species listed were analyzed for their potential to occur in the project site based on habitat affinities, elevation range, and geographic range. For the purposes of this assessment, special-status species and other protected biological resources are those that fall into one or more of the following categories:
• Species listed as rare, threatened, or endangered under the federal Endangered Species Act (FESA) or California Endangered Species Act (CESA), including candidates and species proposed for listing;
• Species designated as rare, protected, or fully protected pursuant to the California Fish and Game Code (FGC);
• Species considered a Species of Special Concern (SSC) by the CDFW; • Species meeting the definition of rare or endangered under Section 15380 of CEQA; Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 27 • Plants having a California Rare Plant Rank (CRPR) of 1, 2, or 3; • Nesting bird species protected by FGC; and
• Aquatic resources or other sensitive habitats potentially regulated by federal, state, and/or local agencies,
Field Reconnaissance
A biological reconnaissance survey was conducted by HELIX biologist Dave Pfuhler on June 19, 2024. The project site was assessed for plant communities, habitat types, aquatic resources, and wildlife present at the time of the survey, as well as for the potential for the project site to support special-status species.

To classify the habitat types occurring on the project site, HELIX consulted the generalized plant community classification schemes of CDFW’s California Wildlife Habitat Relationship Habitat Classification Scheme (Mayer and Laudenslayer 1988). Our final classification and characterization of the habitat types within the project site were based on field observations.

Preliminary wetland boundaries within the project site were mapped as part of the reconnaissance surveys. While a formal aquatic resources delineation was not performed, the extent of aquatic resources mapped are believed to be reflective of wetland conditions at the project site in an average rainfall year.

Species Observations
There were no special-status plant or wildlife species observed in the project site during the field reconnaissance on June 19, 2024. The field reconnaissance was conducted outside of the bloom period when some annual plants would be identifiable, but due to the frequent disturbance activities along Old River Road by vehicular and agricultural operations, special-status plants are not anticipated to be found within the project site. Other wildlife species observed on the project site and in the vicinity of the project site include red winged blackbird (Agelaius phoeniceus), house finch (Haemorhous mexicanus), house sparrow (Passer domesticus), northern mockingbird (Mimus polyglottos), black chinned hummingbird (Archilochus alexandri), Anna’s hummingbird (Calypte anna), and mourning dove (Zenaida macroura).

Special-Status Plant Species
According to the database query, 22 listed and/or special-status plants have the potential to occur in the vicinity of the project site (CDFW 2024; CNPS 2024; USFWS 2024). Based on field observations, published information, and literature review, no special-status plants have potential to occur within the project site. The frequent disturbance and herbicide application implemented by agricultural activities, and the continued maintenance of urbanized areas do not present suitable habitat for special statusplants.

Special-Status Wildlife Species
According to the database query, 41 listed and/or special-status wildlife have the potential to occur in the vicinity of the project site (CDFW 2024; USFWS 2024). Based on field observations, published information, and literature review, one special-status animal has potential to occur within the project site: Swainson’s hawk (Buteo swainsoni). This species has the potential to utilize ornamental trees found Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 28 within the margins of the urbanized habitat for nesting due to their proximity to suitable foraging habitat. In addition to this special-status wildlife species, other migratory birds and raptors protected under federal, State, and local laws/policies also have the potential to occur within the project site. No other critical, or sensitive habitats that would host special-status species were identified within the project site.

Sensitive Habitats
Sensitive habitats include those that are of special concern to resource agencies or those that are protected under CEQA, Section 1600 of the FGC (i.e., riparian areas) and/or Sections 401 and 404 of the Clean Water Act, which include wetlands and other waters of the U.S. Additionally, sensitive habitats, including native trees and oak woodland habitat, are protected under the specific policies outlined in the Kern County General Plan. Sensitive habitats were not identified within the project site.

Impact Analysis
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Less Than Significant with Mitigation Incorporated.

Special-Status Plants
Based on field observations, published information, and literature review, no special-status plants have potential to occur within the project site. The frequent disturbance and herbicide application implemented by agricultural activities, and the continued maintenance of urbanized areas do not present suitable habitat for special status-plants. Therefore, the proposed project would have a less than significant impact on special-status plants.

Special-Status Wildlife Species
Based on field observations, published information, and literature review, one special-status animal has potential to occur within the project site: Swainson’s hawk (Buteo swainsoni). This species has the potential to utilize ornamental trees found within the margins of the urbanized habitat for nesting due to their proximity to suitable foraging habitat. In addition to this special-status wildlife species, other migratory birds and raptors protected under federal, State, and local laws/policies also have the potential to occur within the project site.

Project construction activities have the potential to affect Swainson’s hawk if it were to nest within the project site. If Swainson’s hawk were to nest within or adjacent to the site, impacts to nesting could occur through noise, vibration, and the presence of construction equipment and personnel. Eggs and young still dependent on the nest would be susceptible to injury or mortality through physical contact or through nest abandonment caused by displacement of adults. Needless destruction of eggs or young would be a violation of the Fish and Game Code. Mitigation Measure BIO-1 would be implemented to reduce potential impacts to Swainson’s hawk. With implementation of Mitigation Measure BIO-1, the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 29 Migratory birds are protected under the Migratory Bird Treaty Act (MBTA) of 1918 (16 U.S.C. 703-711).

The MBTA makes it unlawful to take, possess, buy, sell, purchase, or barter any migratory bird listed under 50 Code of Federal Regulations (CFR) 10; this also includes feathers or other parts, nests, eggs, or products, except as allowed by implementing regulations (50 CFR 21). Additionally, Section 3503 of the California Fish and Game Code states that it is unlawful to take, possess, or needlessly destroy the nest or eggs of any bird. Section 3503.5 specifically states that it is unlawful to take, possess, or destroy any raptors (i.e., hawks, owls, eagles, and falcons), including their nests or eggs; Section 3513 specifically states that it is unlawful to take or possess any migratory nongame bird as designated in the MBTA or any part of such migratory nongame bird except as provided by rules and regulations adopted by the Secretary of the Interior under provisions of the MBTA.

A number of migratory birds and raptors have the potential to nest in or adjacent to the project site.

Suitable nest locations within and adjacent to the project site include trees, housing eaves, other artificial structures, and bare ground. There is potential for direct and indirect impacts to nesting birds if they were to nest within or adjacent to the project site. Eggs and young still dependent on the nest would be susceptible to injury or mortality through physical contact or through nest abandonment caused by the displacement of adults. Needless destruction of eggs or young would be a violation of the Fish and Game Code. Mitigation Measure BIO-1 would be implemented to reduce potential impacts to nesting and migratory birds and raptors. With implementation of Mitigation Measure BIO-1, the impact would be less than significant.

Impact Conclusion
No special-status plants have potential to occur within the project site, and the impact would be less than significant. One special-status animal has potential to occur within the project site: Swainson’s hawk. Mitigation Measure BIO-1 would be implemented to reduce potential impacts to Swainson’s hawk. Additionally, a number of migratory birds and raptors have the potential to nest in or adjacent to the project site. Mitigation Measure BIO-1 would be implemented to reduce potential impacts to nesting and migratory birds and raptors. With implementation of Mitigation Measure BIO-1, the impact would be less than significant.

BIO-1 Pre-Construction Surveys and Worker Environmental Awareness Training. To avoid impacts to nesting birds, all ground disturbing activity and all vegetation clearing, including removal of trees and shrubs, shall be completed between September 1 and January 31, if feasible.

If vegetation removal and grading activities begin during the nesting season (February 1 to August 31), a qualified biologist shall conduct a pre-construction survey of the project footprint for active nests. Additionally, the surrounding 500 feet should be surveyed for active raptor nests, where accessible. A windshield survey for potential Swainson’s hawk nests shall be conducted within 0.25 mile of the footprint as part of the survey. The pre-construction survey shall be conducted within 14 days before the commencement of ground-disturbing activities. If the pre-construction survey shows that there is no evidence of active nests, a letter report shall be prepared to document the survey, and no additional measures are recommended. If construction does not commence within 14 days of the pre-construction survey, or halts for more than 14 days, an additional survey is required before starting work. If active nests are identified, the following measure shall be implemented:

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 30 • A species-specific buffer shall be established by a qualified biologist around active nests and no construction activities within the buffer shall be allowed until a qualified biologist has determined that the nest is no longer active (i.e., the nestlings have fledged and are no longer reliant on the nest, or the nest has failed). Encroachment into the buffer may occur at the discretion of a qualified biologist. Any encroachment into the buffer shall be monitored by a qualified biologist to determine whether nesting birds are being impacted.

A qualified biologist shall conduct environmental awareness training to all project-related personnel before the initiation of work within the nesting season (February 1-August 31). b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
No Impact. No riparian habitats, sensitive natural communities, or other protected habitats are located on or adjacent to the project site. Therefore, no impact would occur. c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
No Impact. There are no potential waters of the U.S. or state on the site. Therefore, there would be no impact to potential waters of the U.S. or state.
d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
No Impact. The project site is comprised of a developed agricultural road corridor and a small rural community. Several houses and paved roads are found throughout the project site as well as barren areas. Agricultural uses along the road corridor support orchards, annual crops, and some fallowed lands. Although birds may use trees on-site, the project site does not function as a wildlife corridor or nursery site. In addition, the proposed project’s aboveground impacts would be limited to the construction period and would not result in permanent aboveground changes impeding wildlife movement. The proposed project would not substantially interfere with wildlife movement or nursery sites, and no impact would occur.
e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
No Impact. The proposed project would not conflict with any local policies or ordinances protecting biological resources. No trees would be removed and therefore there would be no impact. f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? Less Than Significant Impact. The project site is within the area for the Metropolitan Bakersfield Habitat Conservation Plan (MBHCP; City 1994). However, the proposed project would not conflict with the provisions of the MBHCP because the project-specific Mitigation Measure BIO-1 outlined in the Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 31 discussion of impact a) would address impacts to special-status wildlife species with potential to occur in the project area. Therefore, as the proposed project does not conflict with the provisions of the MBHCP, the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 32 V. CULTURAL RESOURCES
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Cause a substantial adverse change in the significance of a historical resource pursuant to Section 15064.5? ☐ ☒ ☐ ☐ b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5? ☐ ☒ ☐ ☐ c) Disturb any human remains, including those interred
outside of dedicated cemeteries? ☐ ☒ ☐ ☐
The discussion below is based on a Cultural Resources Letter Report prepared by HELIX Environmental Planning, Inc. (HELIX 2024) and attached to this Initial Study as Appendix C.

Methodology
Records Searches
HELIX Archaeologists conducted a records search at the Southern San Joaquin Valley Information Center on May 15, 2024, which revealed that 26 cultural resource surveys have been conducted within a 0.5- mile radius of the project’s Area of Potential Effect (APE), and that 11 of these studies included the APE as part of their survey area. One cultural resource had been previously recorded within the proposed project’s APE, and 17 cultural resources have been previously recorded within a 0.5-mile radius of the APE. None of the resources are anticipated to be affected by the proposed project.

On May 15, 2024, HELIX requested that the Native American Heritage Commission (NAHC) conduct a search of their Sacred Lands File (SLF) for the presence of Native American sacred sites or human remains in the vicinity of the proposed project area. A written response received from the NAHC on May 30, 2024, stated that the results of the SLF search were negative. Subsequently, on June 17, 2024, HELIX sent letters to eight (8) Native American contacts that were recommended by the NAHC as potential sources of information related to cultural resources in the vicinity of the project area. The letters described the proposed project, provided location maps, and requested information regarding cultural resources in the immediate area, as well as any feedback or concerns they may have related to the proposed project, for informational purposes only. On July 2, 2024, HELIX received a written response from Robert Pennell, the Cultural Resource Director for the Table Mountain Rancheria. The letter stated that the proposed project was beyond the Table Mountain Rancheria’s area of interest. As of the date of this report, no other responses have been received from the Native American contacts.

For information about tribal consultation under the CEQA (AB 52 consultation) between the tribes and the Lead Agency, see Section 7.XVIII, Tribal Cultural Resources.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 33 Regulatory Framework
Federal Laws, Regulations, and Policies
National Historic Preservation Act of 1966 (16 USC 470) The National Historic Preservation Act of 1966 (16 USC 470), enacted in 1966, declared a national policy of historic preservation, and instituted a multifaceted program, administered by the Secretary of the Interior, to encourage the achievement of preservation goals at the federal, state, and local levels. The NHPA authorized the expansion and maintenance of the NRHP, established the position of State Historic Preservation Officer (SHPO) and provided for the designation of State Review Boards, set up a mechanism to certify local governments to carry out the purposes of the NHPA, assisted Native American tribes in preserving their cultural heritage, and created the Advisory Council on Historic Preservation (ACHP).

National Register of Historic Places
The National Register of Historic Places (NRHP) was established by the National Historic Preservation Act (HPA) of 1966 as “an authoritative guide to be used by federal, state, and local governments, private groups, and citizens to identify the Nation’s cultural resources and to indicate what properties should be considered for protection from destruction or impairment” (36 CFR Part 60.2).

The NRHP recognizes properties that are significant at the national, state, and local levels. To be eligible for listing in the NRHP, a resource must be significant in American history, architecture, archaeology, engineering, or culture. Districts, sites, buildings, structures, and objects of potential significance must also possess integrity of location, design, setting, materials, workmanship, feeling, and association. A property is eligible for the NRHP if it is significant under one or more of the following criteria:
• Criterion A: It is associated with events that have made a significant contribution to the broad patterns of our history.
• Criterion B: It is associated with the lives of persons who are significant in our past. • Criterion C: It embodies the distinctive characteristics of a type, period, or method of construction; represents the work of a master; possesses high artistic values; or represents a significant and distinguishable entity whose components may lack individual distinction. • Criterion D: It has yielded, or may be likely to yield, information important in prehistory or history (36 CFR 60.4).

Cemeteries, birthplaces, graves of historic figures, properties owned by religious institutions or used for religious purposes, structures that have been moved from their original locations, reconstructed historic buildings, and properties that are primarily commemorative in nature are not considered eligible for the NRHP unless they satisfy certain conditions. In general, a resource must be at least 50 years old to be considered for the NRHP, unless it satisfies a standard of exceptional importance.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 34 State Laws, Regulations, and Policies
California Environmental Quality Act
Pursuant to CEQA, a historical resource is a resource listed in, or eligible for listing in, the California Register of Historical Resources (CRHR). In addition, resources included in a local register of historic resources or identified as significant in a local survey conducted in accordance with State guidelines, are also considered historic resources under CEQA, unless a preponderance of the facts demonstrates otherwise. According to CEQA, the fact that a resource is not listed in, or determined eligible for listing in, the CRHR, or is not included in a local register or survey, shall not preclude a Lead Agency, as defined by CEQA, from determining that the resource may be a historic resource as defined in California Public Resources Code (PRC) Section 5024.1.7.

CEQA applies to archaeological resources when (1) the historic or prehistoric archaeological resource satisfies the definition of a historical resource, or (2) the historic or prehistoric archaeological resource satisfies the definition of a “unique archaeological resource.” A unique archaeological resource is an archaeological artifact, object, or site that has a high probability of meeting any of the following criteria (PRC Section 21083.2(g)):

1. The archaeological resource contains information needed to answer important scientific research questions, and there is a demonstrable public interest in that information.

2. The archaeological resource has a special and particular quality, such as being the oldest of its type or the best available example of its type.

3. The archaeological resource is directly associated with a scientifically-recognized important prehistoric or historic event or person.

California Register of Historical Resources
Created in 1992 and implemented in 1998, the CRHR is “an authoritative guide in California to be used by state and local agencies, private groups, and citizens to identify the state’s historical resources and to indicate what properties are to be protected, to the extent prudent and feasible, from substantial adverse change” (PRC Section 5024.1(a)). Certain properties, including those listed in or formally determined eligible for listing in the NRHP and California Historical Landmarks, numbered 770 and higher, are automatically included in the CRHR. Other properties recognized under the California Points of Historical Interest program, identified as significant in historic resources surveys, or designated by local landmarks programs may be nominated for inclusion in the CRHR.

A resource, either an individual property or a contributor to a historic district, may be listed in the CRHR if the State Historical Resources Commission determines that it meets one or more of the following criteria, which are modeled on NRHP criteria (PRC Section 5024.1(c)):

Criterion 1: It is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage.

Criterion 2: It is associated with the lives of persons important in our past.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 35 Criterion 3: It embodies the distinctive characteristics of a type, period, region, or method of construction; represents the work of an important creative individual; or possesses high artistic values.

Criterion 4: It has yielded, or may be likely to yield, information important in history or prehistory.

Resources nominated to the CRHR must retain enough of their historic character or appearance to be recognizable as historic resources and to convey the reasons for their significance. It is possible that a resource whose integrity does not satisfy NRHP criteria may still be eligible for listing in the CRHR. A resource that has lost its historic character or appearance may still have sufficient integrity for the CRHR if, under Criterion 4, it maintains the potential to yield significant scientific or historical information or specific data. Resources that have achieved significance within the past 50 years also may be eligible for inclusion in the CRHR, provided that enough time has lapsed to obtain a scholarly perspective on the events or individuals associated with the resource.

California Health and Safety Code 7050.5
Section 7050.5 of the California Health and Safety Code states that in the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent remains until the coroner of the county in which the remains are discovered has determined if the remains are subject to the coroner’s authority. If the human remains are of Native American origin, the coroner must notify the NAHC within 24 hours of this identification.

Native American Heritage Commission
PRC Section 5097.91 established the NAHC, whose duties include the inventory of places of religious or social significance to Native Americans and the identification of known graves and cemeteries of Native Americans on private lands (PRC Section 5097.94). The NAHC is responsible for bring forth actions regarding the prohibition or mitigation of severe or irreparable damage to Native American sanctified cemeteries, places of worship, religious or ceremonial sites, or sacred shrines located on public property. PRC Section 5097.94 and Section 5097.98 specify steps to be followed when the NAHC receives notification of a discovery of Native American human remains from a county coroner, including repatriation under the Native American Graves and Repatriation Act of 2001 and assisting landowners with developing agreements with appropriate Native American groups for the dignified treatment of Native American burials and associated cultural material.

California Public Resources Code Section 5097.98
Section 5097.98 of the California Public Resources Code states that the NAHC, upon notification of the discovery of Native American human remains pursuant to Health and Safety Code Part 7050.5, shall immediately notify those persons (i.e., the Most Likely Descendant or “MLD”) it believes to be descended from the deceased. With permission of the landowner or a designated representative, the MLD may inspect the remains and any associated cultural materials and make recommendations for treatment or disposition of the remains and associated grave goods. The MLD shall provide recommendations or preferences for treatment of the remains and associated cultural materials within 48 hours of being granted access to the site.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 36 Impact Analysis
a) Cause a substantial adverse change in the significance of a historical resource pursuant to Section 15064.5?
b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 15064.5?
Less Than Significant with Mitigation Incorporated. The records search conducted by HELIX on May 15, 2024, determined that 17 previously recorded cultural resources are located within 0.5 mile of the current APE, but outside of the APE itself, and that one additional cultural resource was located within the APE. According to SSJCIV records, the Stine Canal was recommended as ineligible for inclusion in the NRHP on May 7, 1996, by Bryan Apper, AICP, of the California Department of Transportation office in Fresno, California. In a response letter dated May 24, 1996, Ms. Cherilyn Widell, California SHPO, concurred with the recommendation that the Stine Canal was not eligible for inclusion on the NRHP under any of the criteria established by 36 CFR 60.4, and that the canal does not have strong association with historic events or persons, nor does it possess significance as an architectural or engineering structure. As this was the only potential historical resource identified within the APE and has been deemed ineligible for inclusion on the NRHP, the proposed project is not anticipated to cause a substantial change in the significance of a historic resource. No archaeological resources within the APE or in the project vicinity have been previously documented and listed within the SSJCIV records system.

On May 15, 2024, HELIX requested that the NAHC conduct a search of their Sacred Lands File for the presence of Native American sacred sites or human remains in the vicinity of the proposed project site.

A written response received from the NAHC on May 30, 2024, stated that the results of the Sacred Lands File search were negative. On June 17, 2024, HELIX sent letters to 8 Native American contacts that were recommended by the NAHC as potential sources of information related to cultural resources in the vicinity of the project site. The letters advised the tribes and specific individuals of the proposed project and requested information regarding cultural resources in the immediate area, as well as any feedback or concerns related to the proposed project. The letters were sent to the following individuals:
• Delia Dominguez, Chairperson, Kitanemuk & Yowlumne Tejon Indians • Violet Walker, Chairperson, Northern Chuman Tribal Council • Bob Pennell, Cultural Resource Director, Table Mountain Rancheria • Michelle Heredia-Cordova, Chairperson, Table Mountain Rancheria • Candice Garza, CRM Scheduler, Tejon Indian Tribe
• Kerri Vera, Environmental Department, Tule River Indian Tribe • Joey Garfield, Tribal Archaeologist, Tule River Indian Tribe • Neil Peyron, Chairperson, Tule River Indian Tribe
On July 2, 2024, HELIX received a written response from Robert Pennell, the Cultural Resource Director for the Table Mountain Rancheria. The letter stated that the proposed project was beyond the Table Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 37 Mountain Rancheria’s area of interest. No other responses have been received from these Native American points of contact. For information about tribal consultation under CEQA (AB 52 consultation) between tribes and the Lead Agency, see Section 7.XVIII, Tribal Cultural Resources.

The results of records searches have led HELIX to recommend that there would be no effect on historical resources or historic properties, including archaeological and built-environment resources, as a result of project implementation. No additional studies or archaeological work are recommended at this time.

However, HELIX recommends that the Accidental Discovery of Cultural Resources protocol (Mitigation Measure CUL-1) be implemented to prepare the project team for the unlikely event that cultural resources are encountered during excavation and construction activities. Without mitigation, the impact is potentially significant. Implementation of Mitigation Measures CUL-1 would reduce the impact to less than significant. Therefore, the impact on historical and archaeological resources pursuant to PRC Section 15064.5 would be less than significant with mitigation incorporated for questions a) and b).

CUL-1 Accidental Discovery of Cultural Resources. In the event that cultural resources are exposed during ground-disturbing activities, construction activities should be halted within 100 feet of the discovery. Cultural resources could consist of but are not limited to stone, bone, wood, or shell artifacts, or features including hearths, structural remains, or historic dumpsites. If the resources cannot be avoided during the remainder of construction, an archaeologist who meets the Secretary of the Interior’s Professional Qualifications Standards should then be retained, in coordination with the City to assess the resource and provide appropriate management recommendations. If the discovery proves to be CRHR- or NRHP-eligible, additional work, such as data recovery excavation, may be warranted and should be discussed in consultation with the City.
c) Disturb any human remains, including those interred outside of dedicated cemeteries? Less Than Significant Impact with Mitigation Incorporated. Records searches conducted by HELIX staff did not find indications of precontact cultural resources within the APE. However, the possibility exists that ground-disturbing activities during construction may inadvertently uncover previously unknown buried human remains or cultural resources. Although it is highly unlikely that there would be an impact to human remains from construction or operation of the proposed project, there is always the possibility that ground-disturbing activities during construction may uncover previously unknown buried human remains. Therefore, implementation of Mitigation Measure CUL-2, Accidental Discovery of Human Remains, would ensure that impacts related to the inadvertent discovery of human remains remain less than significant. Impacts would be less than significant with mitigation incorporated.

CUL-2 Accidental Discovery of Human Remains. Although considered highly unlikely, there is always the possibility that ground disturbing activities during construction may uncover previously unknown human remains. In the event of an accidental discovery or recognition of any human remains, PRC Section 5097.98 must be followed. Once project-related earthmoving begins and if there is a discovery or recognition of human remains, the following steps shall be taken:

1. There shall be no further excavation or disturbance of the specific location or any nearby area reasonably suspected to overlie adjacent human remains until the County Coroner is contacted to determine if the remains are Native American and if an investigation of the cause of death is required. If the coroner determines the remains are Native American, the coroner shall contact the NAHC within 24 hours, and the NAHC Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 38 shall identify the person or persons it believes to be the “most likely descendant” of the deceased Native American. The most likely descendant may make recommendations to the landowner or the person responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains, and any associated grave goods as provided in PRC Section 5097.98, or

2. Where the following conditions occur, the landowner or their authorized representative shall rebury the Native American human remains and associated grave goods with appropriate dignity either in accordance with the recommendations of the most likely descendent or on the project area in a location not subject to further subsurface disturbance:
a. The NAHC is unable to identify a most likely descendent or the most likely descendent failed to make a recommendation within 48 hours after being notified by the commission;
b. The descendent identified fails to make a recommendation; or The landowner or his authorized representative rejects the recommendation of the descendent, and the mediation by the NAHC fails to provide measures acceptable to the landowner.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 39 VI. ENERGY
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Result in potentially significant environmental
impact due to wasteful, inefficient, or unnecessary
consumption of energy resources, during project
construction or operation?
☐ ☐ ☒ ☐
b) Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?
☐ ☐ ☒ ☐
The discussion below is based on an Air Quality and Greenhouse Gas Emissions Letter Report prepared by HELIX Environmental Planning, Inc. and attached to this Initial Study as Appendix A.

Environmental Setting
California’s electricity needs are satisfied by a variety of entities, including investor-owned utilities, publicly owned utilities, electric service providers and community choice aggregators. In 2020, the California power mix totaled 272,576 gigawatt hours. In-state generation accounted for 51 percent of the state’s power mix. The remaining electricity came from out-of-state imports (CEC 2021a). Table 6, California Electricity Sources 2020, provides a summary of California’s electricity sources as of 2020.

Table 1
CALIFORNIA ELECTRICITY SOURCES 2020
Fuel Type Percent of California Power
Coal 2.74
Large Hydro 12.21
Natural Gas 37.06
Nuclear 9.33
Oil 0.01
Other (Petroleum Coke/Waste Heat) 0.19
Renewables (Excluding Large Hydro) 33.09
Unspecified 5.36
Source: CEC 2021a
Natural gas provides the largest portion of the total in-state capacity and electricity generation in California, with nearly 45 percent of the natural gas burned in California used for electricity generation in a typical year. Much of the remainder is consumed in the residential, industrial, and commercial sectors for uses such as cooking, space heating, and as an alternative transportation fuel. In 2012, total natural gas demand in California for industrial, residential, commercial, and electric power generation was 2,313 billion cubic feet per year (bcf/year), up from 2,196 bcf/year in 2010 (CEC 2021b).

I I
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 40 Transportation accounts for a major portion of California’s energy budget. Automobiles and trucks consume gasoline and diesel fuel, which are nonrenewable energy products derived from crude oil.

Gasoline is the most used transportation fuel in California, with 97 percent of all gasoline being consumed by light-duty cars, pickup trucks, and sport utility vehicles (SUVs). In 2015, 15.1 billion gallons of gasoline were sold in California (CEC 2021c). Diesel fuel is the second most consumed fuel in California, used by heavy-duty trucks, delivery vehicles, buses, trains, ships, boats, and farm and construction equipment. In 2015, 4.2-billion gallons of diesel were sold in California (CEC 2021d).

The project site is serviced by Pacific Gas & Electric (PG&E) for electricity and is serviced by Southern California Gas for gas.

Impact Analysis
a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation? Less than Significant Impact. Construction of the proposed project would consume energy, primarily in the form of petroleum-based fuels (i.e., gasoline and diesel). Heavy-duty off-road construction equipment, on-road trucks, vendor trips, and worker maintenance trips would consume these fuels.

Project-related consumption of such energy resources for construction would be temporary, typical for this type of construction, and cease upon the completion of construction. No inefficient or unnecessary construction methods are proposed such that excessive energy resources would be consumed during project construction. During project operation, no energy resources would be required since the proposed project would not require new backup pumps or generators. Therefore, the project would not result in wasteful, inefficient, or unnecessary consumption of energy resources, and impacts would be less than significant.
b) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency? Less than Significant Impact. See discussion under question a) above. The proposed project would not conflict with or obstruct a State or local plan for renewable energy efficiency. The project would conform to all applicable State, federal, and local laws, and codes. Therefore, impacts would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 41 VII. GEOLOGY AND SOILS
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death
involving:
i. Rupture of a known earthquake fault, as delineated
on the most recent Alquist-Priolo Earthquake Fault
Zoning Map issued by the State Geologist for the area
or based on other substantial evidence of a known
fault? Refer to Division of Mines and Geology Special
Publication 42.
☐ ☐ ☒ ☐
ii. Strong seismic ground shaking? ☐ ☐ ☒ ☐
iii. Seismic-related ground failure, including
liquefaction? ☐ ☐ ☒ ☐
iv. Landslides? ☐ ☐ ☒ ☐
b) Result in substantial soil erosion or the loss of topsoil? ☐ ☐ ☒ ☐ c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project,
and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
☐ ☐ ☒ ☐
d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial
direct or indirect risks to life or property?
☐ ☐ ☒ ☐
e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water?
☐ ☐ ☐ ☒
f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? ☐ ☒ ☐ ☐
Environmental Setting
The project site is located within the Great Valley Geomorphic Province of California, which is an alluvial plain about 50 miles wide and 400 miles long between the Coast Ranges and the Sierra Nevada. The Great Valley is drained by the Sacramento and San Joaquin rivers, which join and enter San Francisco Bay (County 2004). The major faults and faulting systems in the County include the San Andreas Fault, Garlock Fault, White Wolf Fault, Pond-Poso Creek Fault, Kern Front Fault, Owens Valley Fault, and Buena Vista Fault.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 42 The mapped soil types within the project site are described below (NRCS 2024):
• Granoso sandy loam, 0 to 2 percent slopes, overwash. This soil has a parent material of alluvium derived from mixed rock sources. A typical soil profile is sandy loam (0 - 10 inches), loamy sand (10 - 20 inches) then sand (20 - 62 inches). This soil is somewhat excessively drained, has a very low runoff class, a rare frequency of flooding, and no frequency of ponding. • Kimberlina fine sandy loam, 0 to 2 percent slopes MLRA 17. This soil has a parent material of alluvium derived from igneous and sedimentary rock. A typical soil profile is fine sandy loam (0 - 45 inches) and silt loam (45 - 71 inches). This soil is well drained, has a very low runoff class, a rare frequency of flooding, and no frequency of ponding. • Bakersfield fine sandy loam, drained, 0 to 1 percent slopes. This soil has a parent material of alluvium derived from granitoid rock. A typical soil profile is fine sandy loam (0 - 16 inches), stratified sand to loam (19 - 45 inches), loam (45 - 51 inches), stratified sandy loam to silt loam (51 – 58 inches), and stratified sand to loam (58 - 66 inches). This soil is somewhat poorly drained, has a negligible class, a rare frequency of flooding, and no frequency of ponding.

Impact Analysis
a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving:
i. Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42?
Less Than Significant Impact. The project site is not located on or near an Alquist-Priolo Earthquake Fault Zone (DOC 2024b). The nearest active fault to the project site is the White Wolf Fault located approximately 20 miles southeast of the project site (DOC 2024c). As there are no faults mapped within or near the project site, ground rupture as a result of the proposed project would be unlikely. Therefore, the impact would be less than significant.
ii. Strong seismic ground shaking?
Less Than Significant Impact. The proposed project would install approximately 6,000 linear feet of a new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines, and 29 household connections.

Three fire hydrants would also be installed, and two wells would be abandoned as part of the proposed project. There is always potential in California for seismic ground shaking; however, the proposed project would not construct new buildings, residences, or other aboveground structures that have the potential to be inhabitable or hazardous to humans or other structures in a ground-shaking event.

The proposed pipeline alignments and fire hydrants would be constructed in compliance with current codes and standards, including California Building Code (CBC) requirements to reduce potential hazards resulting from strong seismic ground shaking. Therefore, the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 43 iii. Seismic-related ground failure, including liquefaction? Less Than Significant Impact. Seismic ground shaking of relatively loose, granular soils that are saturated or submerged can cause the soil to liquefy and temporarily behave as a dense fluid.

Liquefaction is caused by a sudden temporary increase in pore water pressure due to seismic densification or other displacement of submerged granular soils. Liquefaction most often occurs in areas underlain by young alluvium where the groundwater table is higher than 50 feet below the ground surface (County 2004).

The project site is not located on or near the Alquist-Priolo Earthquake Fault Zone and is not located within a liquefaction zone (DOC 2024b). As the proposed project would not construct habitable structures, it is not expected that implementation of the proposed project would expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving liquefaction. The proposed pipeline alignments and fire hydrants would be constructed in compliance with current codes and standards, including CBC requirements to reduce potential hazards resulting from liquefaction. Therefore, the impact would be less than significant. iv. Landslides?
Less Than Significant Impact. Areas in Kern County subject to landslides are primarily located in the Coast Range, San Emidio Mountains, and in the vicinity of Bear Mountain (County 2004). The proposed project would be located within the ROW of Old River Road, SR-119, Par Street, Beam Street, and front yards of existing residences. The project area is generally flat with elevations that range from 338 feet to 346 feet above mean sea level (amsl). Additionally, the project site is not located within a landslide zone (DOC 2024b).

Due to the natural topography of the proposed project area and the small scale of required construction activities, it is not expected that implementation of the proposed project would expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving landslides. Therefore, the impact would be less than significant. b) Result in substantial soil erosion or the loss of topsoil? Less Than Significant Impact. The proposed project would install approximately 6,000 linear feet of a new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines, and 29 household connections.

Three fire hydrants would also be installed, and two wells would be abandoned as part of the proposed project. The new 10-inch water main would be located within the disturbed portions of Old River Road and SR-119, and the proposed 8-inch lateral pipelines and household connections would be located within disturbed portions of Par Street, Beam Street, and front yards of existing residences.

Construction of the proposed project would require surface disturbance, which may include the removal of stabilizing surfaces, excavation, and backfill. However, after completion of construction activities, these surfaces would be restabilized, and there would be no change of erosion potential in the project area. Potential short-term impacts from construction would be addressed through conformance with applicable elements of the National Pollutant Discharge Elimination System (NPDES) Construction General Permit, including implementation of a SWPPP. The SWPPP would implement Best Management Practices (BMPs) during construction to reduce on-site erosion of disturbed soil. Therefore, with implementation of the SWPPP and BMPs, the project would not result in substantial soil erosion or the loss of topsoil, and the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 44 c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
Less Than Significant Impact. The proposed project site includes the following soil types: Granoso sandy loam, 0 to 2 percent slopes, overwash; Kimberlina fine sandy loam, 0 to 2 percent slopes MLRA 17; and Bakersfield fine sandy loam, drained, 0 to 1 percent slopes (NRCS 2024). As described above in the impact analysis for question a.iv) above, the proposed project would not result in adverse effects related to landslides. The potential for lateral spreading and subsidence is related to a site’s potential for liquefaction. As described in question a.iii), the project site is not located within a liquefaction zone and the potential adverse effects related to liquefaction would be less than significant. Therefore, it is not anticipated that lateral spreading or subsidence would occur at the project site.

Additionally, the proposed pipeline and fire hydrants would be constructed in compliance with current codes and standards, including CBC requirements to reduce potential hazards resulting from landslides, lateral spreading, subsidence, liquefaction, or collapse. Therefore, the impact would be less than significant.
d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property? Less Than Significant Impact. Expansive soils are fine-grained soils (generally high plasticity clays) that can undergo a significant increase in volume with an increase in water content, and a significant decrease in volume with a decrease in water content. Changes in the water content of a highly expansive soil can result in severe distress to structures constructed on or against the soil. The shrink swell behavior of expansive soils can lead to damage of project improvements over time if not addressed appropriately before construction. Expansive soils generally consist of clay type soils such as smectite, bentonite, montmorillonite, beidellite, vermiculite, and others are known to expand with changes in moisture content.

The project site is comprised of sandy loam soils, including Granoso sandy loam, 0 to 2 percent slopes, overwash; Kimberlina fine sandy loam, 0 to 2 percent slopes MLRA 17; and Bakersfield fine sandy loam, drained, 0 to 1 percent slopes (NRCS 2024). Granoso sandy loam and Kimberline fine sandy loam are well drained soils that have very low runoff classes, while Bakersfield fine sandy loam is somewhat poorly drained. All soil types present on the project site have a rare frequency of flooding and no frequency of ponding, and are not considered to be expansive. The project would not construct habitable structures and would thereby not create risks to life or property. Therefore, the impact would be less than significant.
e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? No Impact. The proposed project does not propose septic tanks or alternative wastewater disposal systems. Therefore, no impact would occur.
f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? Less Than Significant Impact with Mitigation Incorporated. No previous surveys conducted in the proposed project area have identified the proposed project site as sensitive for paleontological Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 45 resources or other geologically sensitive resources, nor have testing or ground disturbing activities performed to date uncovered any paleontological resources or geologically sensitive resources. The new 10-inch water main would be located within the disturbed portions of Old River Road and SR-119, and the proposed 8-inch lateral pipelines and household connections would be located within disturbed portions of Par Street, Beam Street, and front yards of existing residences. While the likelihood of encountering paleontological resources and other geologically sensitive resources is considered low, project-related ground disturbing activities could affect the integrity of a previously unknown paleontological or other geologically sensitive resource. Implementation of Mitigation Measure GEO-1 would reduce potentially significant impacts to a level of less than significant.

GEO-1 Avoid and Minimize Impacts to Paleontological Resources. In the event paleontological or other geologically sensitive resources (such as fossils or fossil formations) are identified during any phase of project construction, all excavations within 100 feet of the find shall be temporarily halted until the find is examined by a qualified paleontologist, in accordance with Society of Vertebrate Paleontology standards. The paleontologist shall notify the appropriate representative at the City who shall coordinate with the paleontologist as to any necessary investigation of the find. If the find is determined to be significant under CEQA, the City shall implement those measures which may include avoidance, preservation in place, or other appropriate measures, as outlined in Public Resources Code Section 21083.2.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 46 VIII. GREENHOUSE GAS EMISSIONS
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the
environment?
☐ ☐ ☒ ☐
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of
greenhouse gases?
☐ ☐ ☒ ☐
The discussion below is based on an Air Quality and Greenhouse Gas Emissions Letter Report prepared by HELIX Environmental Planning, Inc. and attached to this Initial Study as Appendix A.

Environmental Analysis
The proposed project is located in unincorporated Kern County, which lies within the SJVAB. Air quality in the SJVAB is regulated by the USEPA at the federal level, by CARB at the state level, and by the SJVAPCD at the regional level.

The SJVAB comprises all or part of eight counties: San Joaquin, Stanislaus, Fresno, Merced, Madera, Kings, Tulare, and Kern. The distinctive climate of the SJVAB is determined by its terrain and geographic location. The SJVAB is in the southern half of California’s Central Valley and is 250 miles long and averages 35 miles wide. The SJVAB is bounded by the Sierra Nevada Mountains to the east, the Coast Ranges to the west, the Tehachapi Mountains to the south, and is open to the Sacramento Valley and San Francisco Bay Area to the north.

The SJVAB is in a Mediterranean climate zone which is characterized by typically hot and dry summers and sparse rainfall mainly during the winter. Especially in summer, winds in the SJVAB most frequently blow from the northwesterly direction. The region’s topographic features restrict air movement and channel the air mass towards the southeastern end of the basin. A secondary but significant summer wind pattern is from the southeasterly direction and can be associated with nighttime drainage winds from the Sierra Nevada Mountains, and prefrontal conditions. Many days in the winter are marked by stagnation events where winds are very weak. Transport of pollutants during winter can be very limited.

The vertical dispersion of air pollutants in the SJVAB can be limited by persistent temperature inversions. Temperature inversions that occur on the summer days are usually encountered 2,000 to 2,500 feet above the valley floor. In winter months, overnight inversions occur 500 to 1,500 feet above the valley floor. The mountains surrounding the basin are mostly above the typical summer height of inversion layers, restricting dispersion of pollutants (SJVAPCD 2015).

Solar radiation and temperature are particularly important in the chemistry of ozone formation. The SJVAB averages over 260 sunny days per year. Generally, the higher the temperature, the more ozone formed, since reaction rates increase with temperature. The 1937 through 2016 annual average maximum daily temperature as measured at the Bakersfield Airport climatic station, Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 47 approximately 7 miles northeast of the project site, is 77.8 degrees °F. The highest monthly average maximum daily temperature (98.6°F) occurs in July, and the lowest monthly average minimum daily temperature (38.5°F) occurs in December and January. The average annual precipitation is approximately 6.2 inches (Western Regional Climate Center 2016).

Regulatory Setting
Global climate change refers to changes in average climatic conditions on Earth including temperature, wind patterns, precipitation, and storms. Global temperatures are moderated by atmospheric gases.

These gases are commonly referred to as GHGs because they function like a greenhouse by letting sunlight in but preventing heat from escaping, thus warming the Earth’s atmosphere.

GHGs are emitted by natural processes and human (anthropogenic) activities. Anthropogenic GHG emissions are primarily associated with: (1) the burning of fossil fuels during motorized transport, electricity generation, natural gas consumption, industrial activity, manufacturing, and other activities; (2) deforestation; (3) agricultural activity; and (4) solid waste decomposition.

The GHGs defined under California’s AB 32, described below, include carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). Each GHG differs in its ability to absorb heat in the atmosphere based on the lifetime, or persistence, of the gas molecule in the atmosphere. Estimates of GHG emissions are commonly presented in carbon dioxide equivalents (CO2e), which weigh each gas by its global warming potential (GWP). Expressing GHG emissions in CO2e takes the contribution of all GHG emissions to the greenhouse effect and converts them to a single unit equivalent to the effect that would occur if only CO2 were being emitted. GHG emissions quantities in this analysis are presented in metric tons (MT) of CO2e. For consistency with United Nations Standards, modeling, and reporting of GHGs in California and the U.S. use the GWPs defined in the Intergovernmental Panel on Climate Change’s (IPCC) Fourth Assessment Report (IPCC 2007): CO2 – 1; CH4 – 25; N2O – 298.

GHG Reduction Regulations and Plans
The primary GHG reduction regulatory legislation and plans (applicable to the project) at the State and levels are described below. Implementation of California’s GHG reduction mandates are primarily under the authority of CARB at the State level, and under the authority of the SJVAPCD at the regional level.

Executive Order S-3-05: On June 1, 2005, Executive Order (EO) S-3-05 proclaimed that California is vulnerable to climate change impacts. It declared that increased temperatures could reduce snowpack in the Sierra Nevada, further exacerbate California’s air quality problems, and potentially cause a rise in sea levels. To avoid or reduce climate change impacts, EO S-3-05 calls for a reduction in GHG emissions to the year 2000 level by 2010, to year 1990 levels by 2020, and to 80 percent below 1990 levels by 2050. Executive Orders are not laws and can only provide the governor’s direction to State agencies to act within their authority to reinforce existing laws.

Assembly Bill 32 – Global Warming Solution Act of 2006: The California Global Warming Solutions Act of 2006, widely known as AB 32, requires that CARB develop and enforce regulations for the reporting and verification of Statewide GHG emissions. CARB is directed by AB 32 to set a GHG emission limit, based on 1990 levels, to be achieved by 2020. The bill requires CARB to adopt rules and regulations in an open public process to achieve the maximum technologically feasible and cost-effective GHG emission reductions.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 48 Executive Order B-30-15: On April 29, 2015, EO B-30-15 established a California GHG emission reduction target of 40 percent below 1990 levels by 2030. The EO aligns California’s GHG emission reduction targets with those of leading international governments, including the 28-nation European Union.

California is on track to meet or exceed the target of reducing GHGs emissions to 1990 levels by 2020, as established in AB 32. California’s new emission reduction target of 40 percent below 1990 levels by 2030 will make it possible to reach the goal established by EO S-3-05 of reducing emissions to 80 percent under 1990 levels by 2050.

Senate Bill 32: Signed into law by Governor Brown on September 8, 2016, Senate Bill (SB) 32 (Amendments to the California Global Warming Solutions Action of 2006) extends California’s GHG reduction programs beyond 2020. SB 32 amended the Health and Safety Code to include Section 38566, which contains language to authorize CARB to achieve a Statewide GHG emission reduction of at least 40 percent below 1990 levels by no later than December 31, 2030. SB 32 codified the targets established by EO B-30-15 for 2030, which set the next interim step in the State’s continuing efforts to pursue the long-term target expressed in EO B-30-15 of 80 percent below 1990 emissions levels by 2050.

Executive Order S-01-07: This EO, signed by Governor Schwarzenegger on January 18, 2007, directs that a Statewide goal be established to reduce the carbon intensity of California’s transportation fuels by at least 10 percent by the year 2020. It orders that a Low Carbon Fuel Standard (LCFS) for transportation fuels be established for California and directs CARB to determine whether a LCFS can be adopted as a discrete early action measure pursuant to AB 32. CARB approved the LCFS as a discrete early action item with a regulation adopted and implemented in April 2010.

Although challenged in 2011, the Ninth Circuit reversed the District Court’s opinion and rejected arguments that implementing LCFS violates the interstate commerce clause in September 2013. CARB is therefore continuing to implement the LCFS Statewide.

Senate Bill 100: Approved by Governor Brown on September 10, 2018, SB 100 requires that all retail sales of electricity to California end-use customers be procured from 100 percent eligible renewable energy resources and zero-carbon resources by the end of 2045.

Executive Order N-79-20: EO N-79-20, signed by Governor Newsom on September 23, 2020, establishes three goals for the implementation of zero emissions vehicles in California: first, 100 percent of in-State sales of new passenger cars and trucks will be zero-emissions by 2035; second, 100 percent of mediumand heavy-duty vehicles in the State will be zero-emissions vehicles by 2045 for all operations where feasible, and by 2035 for drayage trucks; and third, 100 percent of off-road vehicles and equipment will be zero emissions by 2035 where feasible.

Assembly Bill 1279: Approved by Governor Newsom on September 16, 2022, AB 1279, the California Climate Crisis Act, declares the policy of the State to achieve net zero GHG emissions as soon as possible, but no later than 2045, and achieve and maintain net negative GHG emissions thereafter, and to ensure that by 2045, statewide anthropogenic GHG emissions are reduced to at least 85 percent below the 1990 levels. AB 1279 anticipates achieving these policies through direct GHG emissions reductions, removal of CO2 from the atmosphere (carbon capture), and an almost complete transition away from fossil fuels.

California Air Resources Board Scoping Plan: The Scoping Plan is a strategy CARB develops and updates at least once every five years, as required by AB 32. It lays out the transformations needed across our society and economy to reduce emissions and reach our climate targets. The current 2022 Scoping Plan Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 49 is the third update to the original plan that was adopted in 2008. The initial 2008 Scoping Plan laid out a path to achieve the AB 32 mandate of returning to 1990 levels of GHG emissions by 2020, a reduction of approximately 15 percent below business as usual. The 2008 Scoping Plan included a mix of incentives, regulations, and carbon pricing, laying out the portfolio approach to addressing climate change and clearly making the case for using multiple tools to meet California’s GHG targets. The 2013 Scoping Plan assessed progress toward achieving the 2020 mandate and made the case for addressing short-lived climate pollutants (SLCPs). The 2017 Scoping Plan also assessed the progress toward achieving the 2020 limit and provided a technologically feasible and cost-effective path to achieving the SB 32 mandate of reducing GHGs by at least 40 percent below 1990 levels by 2030. On December 15, 2022, CARB approved the 2022 Scoping Plan for Achieving Carbon Neutrality (2022 Scoping Plan). The 2022 Scoping Plan lays out a path to achieve targets for carbon neutrality and reduce anthropogenic GHG emissions by 85 percent below 1990 levels no later than 2045, as directed by AB 1279. The actions and outcomes in the plan will achieve significant reductions in fossil fuel combustion by deploying clean technologies and fuels; further reductions in SLCPs; support for sustainable development; increased action on natural and working lands to reduce emissions and sequester carbon; and the capture and storage of carbon (CARB 2022).

San Joaquin Valley Air Pollution Control District: In December 2009, the SJVAPCD adopted the following guidance documents applicable to the project:
• Guidance for Valley Land-use Agencies in Addressing GHG Emission Impacts for New Projects under CEQA (SJVAPCD 2009a), and
• District Policy: Addressing GHG Emission Impacts for Stationary Source Projects Under CEQA When Serving as the Lead Agency (SJVAPCD 2009b).

This guidance and policy are the documents referenced in the SJVAPCD’s Guidance for Assessing and Mitigating Air Quality Impacts, adopted in March 2015 (SJVAPCD 2015). Consistent with the District Guidance and District Policy above, SJVAPCD acknowledges the current absence of numerical thresholds, and recommends a tiered approach to establish the significance of the GHG impacts on the environment:

1. If a project complies with an approved GHG emission reduction plan or GHG mitigation program which avoids or substantially reduces GHG emissions within the geographic area in which the project is located, then the project would be determined to have a less than significant individual and cumulative impact for GHG emissions;

2. If a project does not comply with an approved GHG emission reduction plan or mitigation program, then it would be required to implement best performance standards (BPS); and

3. If a project is not implementing BPS, then it should demonstrate that its GHG emissions would be reduced or mitigated by at least 29 percent, compared to business-as-usual.

The SJVAPCD adopted a Climate Change Action Plan (CCAP) in 2008 and issued guidance for development project compliance with the plan in 2009. The guidance adopted an approach that relies on the use of BPS to reduce GHG emissions. Projects implementing BPS would be determined to have a less than cumulatively significant impact. For projects not implementing BPS, demonstration of a 29 percent reduction in project-specific (i.e., operational) GHG emissions from business-as-usual conditions is required to determine that a project would have a less than cumulatively significant impact (SJVAPCD Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 50 2009a). Both the SJVAPCD CCAP and the guidance for development project compliance are limited to achieving the State 2020 GHG reduction goals mandated by AB 32. The SJVAPCD CCAP and the guidance for development project compliance do not address California’s post-2020 GHG reduction goals. Kern County currently does not have a CAP or other GHG reduction plan which addresses post-2020 GHG reductions mandated by SB 32 and AB 1279.The City of Bakersfield is currently in the process of preparing its first Climate Action Plan (CAP), and released a draft CAP for public comment in 2023; however, at the time of this analysis, the City has not adopted the CAP (City 2024a).

Sensitive Receptors
CARB and the OEHHA have identified the following groups of individuals as the most likely to be affected by air pollution: adults over 65, children under 14, infants (including in utero in the third trimester of pregnancy), and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis (CARB 2005; OEHHA 2015). Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved and are referred to as sensitive receptors. Examples of these sensitive receptors are residences, schools, hospitals, and daycare centers.

The closest existing sensitive receptors to the project site are single-family residential homes located 50- feet from the proposed water laterals. The closest school is Independence High School located approximately 350 feet northwest of the northern terminus of the proposed 10-inch water main along Old River Road.

Methodology and Assumptions
For the methodology and assumptions for GHG emissions, please see Section 4.III, Air Quality.

Standards of Significance
Given the relatively small levels of emissions generated by a project in relationship to the total amount of GHG emissions generated on a national or global basis, individual projects are not expected to result in significant, direct impacts with respect to climate change. However, given the magnitude of the impact of GHG emissions on the global climate, GHG emissions from new development could result in significant, cumulative impacts with respect to climate change. Thus, the potential for a significant GHG impact is limited to cumulative impacts. According to Appendix G of the State CEQA Guidelines, the following criteria may be considered in establishing the significance of GHG emissions:

Would the project:

1. Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment?

2. Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs?
The SJVAPCD has adopted the guidance in Guidance for Valley Land-use Agencies in Addressing GHG Emission Impacts for New Projects under CEQA and the policy, Addressing GHG Emission Impacts for Stationary Source Projects Under CEQA When Serving as the Lead Agency. The guidance and policy rely on the use of BPS to assess the significance of project-specific GHG emissions on global climate change Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 51 during the environmental review process. However, SJVAPCD’s adopted BPS are specifically directed at reducing GHG emissions from stationary sources; therefore, the adopted BPS would not generally be applicable to the proposed project as construction of the pipelines would not be a stationary source of emissions. The SJVAPCD guidance does not limit a lead agency’s authority in establishing its own process and guidance for determining significance of project-related impacts on global climate change.

Neither the County, City, nor the SJVAPCD has adopted a GHG emissions threshold for construction and operational emissions. In the event that a local air district’s guidance for addressing GHG impacts does not use numerical GHG emissions thresholds, at the lead agency’s discretion, GHG thresholds adopted by neighboring California air districts may be used to determine impacts. The Sacramento Metropolitan Air Quality Management District (SMAQMD) has adopted a GHG construction threshold of 1,100 MT CO2e per year for a project’s construction emissions (SMAQMD 2021). A project with an emission rate below this threshold is generally considered to have a less than significant impact on GHG emissions.

Impact Analysis
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment?
Less Than Significant Impact.

Construction Emissions
GHG emissions would be generated by the proposed project during construction from vehicle engine exhaust from construction equipment, on-road trucks, vendor trips, and worker maintenance trips.

Construction GHG emissions were calculated using CalEEMod, as described in Methodology and Assumptions. The results of the construction GHG emissions calculations were compared to the SMAQMD threshold in Table 7, Construction GHG Emissions. As shown in Table 7, the construction GHG emissions would not exceed the SMAQMD construction GHG threshold, and the impact would be less than significant.

Table 7

CONSTRUCTION GHG EMISSIONS
Year of Emissions Emissions
(MT CO2e)
2026 567
SMAQMD Construction Threshold (per year) 1,100
Exceed Threshold? No
Source: CalEEMod (output data is provided in Attachment B to Appendix A).

Operational Emissions
As discussed in Methodology and Assumptions, operational emissions were not quantified. Operation of the proposed project would not result in a population increase and would not generate new vehicle trips, and occasional project maintenance activities would be similar to maintenance activated for the exiting water systems. Operation of the proposed project would not require new pumps or backup generators. The proposed project would not result in changes in water use, and the electricity used by the proposed project to treat and divide water to customers would be similar to the electricity used by Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 52 the existing water systems. Therefore, operational GHG emissions would be negligible, and the impact would be less than significant.

Impact Conclusion
Construction and operation of the proposed project would not generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment. The impact would be less than significant.
b) Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Less Than Significant Impact. There are numerous State plans, policies, and regulations adopted for the purpose of reducing GHG emissions. The principal overall State plan and policy is AB 32, the California Global Warming Solutions Act of 2006. The quantitative goal of AB 32 is to reduce GHG emissions to 1990 levels by 2020. SB 32 requires further reductions of 40 percent below 1990 levels by 2030. AB 1279 requires the State to achieve net zero GHG emissions no later than 2045. The mandates of AB 32, SB 32, and AB 1279 are implemented at the State level by the CARB’s Scoping Plan. Because the proposed project’s operational year is post-2020, the project aims to reach the quantitative goals set by SB 32 and AB 1279. Statewide plans and regulations such as GHG emissions standards for vehicles and transportation fuels, and regulations requiring an increasing fraction of electricity to be generated from renewable sources are being implemented at the Statewide level; as such, compliance at the project level is not addressed. Therefore, the proposed project would not conflict with those plans and regulations.

As noted in impact question a) above, construction GHG emissions would not exceed the GHG thresholds, and would be less than significant. In addition, operation of the proposed project would not result in a population increase and would not result in substantial changes in GHG emissions compared to operation of the existing water systems. As a result, the proposed project would not conflict with the GHG reduction objectives of the State’s Scoping Plan, including net zero GHG emissions by 2045, mandated by AB 1279, or the SJVAPCD’s CCAP. The impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 53 IX. HAZARDS AND HAZARDOUS MATERIALS
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Create a significant hazard to the public or the
environment through the routine transport, use, or
disposal of hazardous materials?
☐ ☐ ☒ ☐
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset and
accident conditions involving the release of hazardous
materials into the environment?
☐ ☐ ☒ ☐
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within onequarter mile of an existing or proposed school? ☐ ☐ ☒ ☐
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the
environment?
☐ ☐ ☐ ☒
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two
miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area?
☐ ☐ ☐ ☒
f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency
evacuation plan?
☐ ☒ ☐ ☐
g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
☐ ☐ ☒ ☐
Environmental Setting
The proposed project is located in Kern County southwest of the City of Bakersfield. The nearest school to the project site is Independence High School, located approximately 350 feet northwest of the project site. The nearest public airport is the Bakersfield Municipal Airport located approximately 7 miles east of the project site.

The following databases were reviewed for the project site and surrounding area to identify potential hazardous contamination sites: the State Water Resources Control Board’s GeoTracker tool (SWRCB 2024), California Department of Toxic Substance Control’s (DTSC) EnviroStor online tool (DTSC 2024); and the USEPA’s Superfund National Priorities List (USEPA 2024). Based on the results of the databases reviewed, no hazardous waste sites are on the proposed project site.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 54 Federal and State laws include provisions for the safe handling of hazardous substances. The federal Occupational Safety and Health Administration (OSHA) administers requirements to ensure worker safety. Construction activity must also be in compliance with the California OSHA regulations (Occupational Safety and Health Act of 1970).

Impact Analysis
a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
Less Than Significant Impact. Construction activities may involve the limited transport, storage, use, and/or disposal of hazardous materials, such as for the fueling and servicing of construction equipment on-site. These activities would be short-term or one-time in nature and would be subject to federal, State, and local health and safety regulations, which would minimize hazards related to the use of these materials.

Long-term operation of the proposed project would involve little or no hazardous materials since the proposed project would be mainly subterranean and would not emit hazardous materials. The proposed project would not result in a significant hazard related to the transport, use, or disposal of hazardous materials, and impacts would be less than significant.
b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Less Than Significant Impact. Old River MWC provides water to 46 residents via 14 connections in its

10.7-acre service area. Water is provided by a single well, located within the service area. Water delivered by the Old River MWC system contains uranium levels that exceed the MCL of 30 µg/L established by State and federal regulations. Water from this well also exceeds the 1, 2, 3-TCP MCL of

0.005 µg/L. South Kern MWC provides water to 32 residents via 15 service connections in its 9.7-acre service area. Water is provided by a single well in the northeast corner of the service area. The well currently produces water that exceeds the uranium MCL of 30 µg/L. Water from this well also exceeds the 1, 2, 3-TCP MCL of 0.005 µg/L. The proposed project would abandon the Old River MWC well and the South Kern MWC well and extend the City of Bakersfield’s water system to serve the areas previously served by these two MWCs, thereby consolidating both MWCs into the City of Bakersfield’s water system. Operation of the proposed project would replace the contaminated wells, thereby reducing the community residents’ potential exposure to hazardous materials.

As discussed in the analysis of impact a), limited amounts of hazardous materials would be used during construction; however, these materials would be used and stored in accordance with applicable regulations that would limit the potential for their accidental release. As the proposed pipeline would be mainly subterranean and would not involve the use of hazardous materials, there are no reasonably foreseeable upset or accident conditions that would result in the release of hazardous materials into the environment. Therefore, the impact would be less than significant. c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Less Than Significant Impact. The nearest school to the project site is Independence High School, located approximately 350 feet northwest of the northern terminus of the water main to be installed Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 55 along Old River Road. As discussed under question a), construction activities may involve the limited transport, storage, use, and/or disposal of hazardous materials, such as for the fueling and servicing of construction equipment on-site. These activities would be short-term or one-time in nature and would be subject to federal, State, and local health and safety regulations, which would minimize hazards related to the use of these materials. Long-term operation of the proposed project would involve little or no hazardous materials since the proposed project would be mainly subterranean and would not emit hazardous materials. Therefore, the impact would be less than significant. d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
No Impact. As noted above, the following databases were reviewed for the project site and surrounding area to identify potential hazardous contamination sites: the SWRCB GeoTracker tool (SWRCB 2024), DTSC EnviroStor online tool (DTSC 2024); and the USEPA’s Superfund National Priorities List (USEPA 2024). Based on the results of the databases reviewed, no hazardous waste sites are on the proposed project site. Therefore, the proposed project would not create a significant hazard to the public or the environment and no impact would occur.
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? No Impact. The proposed project is not located within an airport land use plan and is not located within two miles of a public airport or public use airport. The nearest public airport is the Bakersfield Municipal Airport located approximately 7 miles east of the project site. Therefore, the proposed project would not result in a safety hazard or excessive noise for people residing or working in the project area and no impact would occur.
f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
Less Than Significant Impact with Mitigation Incorporated. The proposed project would construct approximately 6,000 linear feet of new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines with connections to 29 households. Three fire hydrants would also be installed for use in case of emergency. The majority of the proposed project would be subterranean, and the proposed pipelines would run underneath Old River Road, SR-119, Par Street, and Beam Street.

Project construction is anticipated to begin as early as April 2026 and continue for approximately nine months. Construction of the pipeline would take place within the ROW of Old River Road, SR-119, Par Street, and Beam Street. Old River Road is categorized as an arterial roadway, while SR-119 is a highway.

Both roads would likely be used by local residents in the event of an evacuation or emergency. The proposed construction along Old River Road, SR-119, Par Street, and Beam Street may result in temporary disturbance to traffic or lane closures along these roads. Full closure of these roads is not anticipated, but individual lanes may be temporarily closed during construction. Mitigation Measure HAZ-1 would require the preparation of Traffic Management Plan before construction to address potential disruption to or re-routing of traffic that might be needed during project construction. With implementation of Mitigation Measure HAZ-1, the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 56 HAZ-1 Traffic Management Plan. If lane closures or speed restrictions are necessary to allow adequate space for project construction, a Traffic Management Plan shall be developed for the proposed project to manage traffic during temporary lane closures along Old River Road, SR-119, and Beam Street. The Traffic Management Plan shall be prepared by the applicant and shall be reviewed and approved by the City before the commencement of construction activities. g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
Less Than Significant Impact. The proposed project would construct approximately 6,000 linear feet of new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines with connections to 29 households.

Three fire hydrants would also be installed for use in case of emergency. As the majority of the proposed project would be subterranean, impacts associated with wildland fires would not be anticipated.

Additionally, according to California Department Forestry and Fire Protection (CAL FIRE) Fire Hazard Severity Zone Map, the project site is located within a Local Responsibility Area (LRA; CAL FIRE 2024).

The project site is not located on or near the Fire Hazard Severity Zone (FHSZ; CAL FIRE 2024). Therefore, the proposed project would not expose people or structures to people or structures to significant risk, and the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 57 X. HYDROLOGY AND WATER QUALITY
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?
☐ ☐ ☒ ☐
b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the
project may impede sustainable groundwater
management of the basin?
☐ ☐ ☒ ☐
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i. Result in substantial erosion or siltation on- or offsite? ☐ ☐ ☒ ☐ ii. Substantially increase the rate or amount of surface runoff in a manner which would result in flooding onor off-site? ☐ ☐ ☒ ☐
iii. Create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide substantial
additional resources of polluted runoff?
☐ ☐ ☒ ☐
iv. Impede or redirect flood flows? ☐ ☐ ☒ ☐
d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? ☐ ☐ ☒ ☐
e) Conflict with or obstruct implementation of a water
quality control plan or sustainable groundwater
management plan?
☐ ☐ ☒ ☐
Environmental Setting
Surface Water
The project area is within the South Valley Floor Watershed with Region 5 – Tulare Lake Hydrologic Basin (CVRWQCB 2018). The SWRCB publishes updates to the Water Quality Control Plan for the Tulare Lake Basin (Basin Plan) to improve water quality and maintain beneficial uses in the drainage area of the San Joaquin Valley south of the San Joaquin River. The Basin Plan describes water quality concerns for the area that include agriculture, forestry, urban land uses, and stormwater runoff (CVRWQCB 2018).

The proposed project is located adjacent to the Stine Canal, which crosses underneath SR-119 just east of its intersection with Old River Road.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 58 Groundwater
Old River MWC and South Kern MWC currently provide water service to residential and commercial customers in the project area. Each MWC operates using a single well, located within their respective service areas, which provides water to adjacent parcels and nearby customers.

Old River MWC provides water to 46 residents via 14 connections in its 10.7-acre service area. Water is provided by a single well, located within the service area. The Old River MWC well was constructed in 1962 and has a ten-inch diameter steel casing perforated from 189 to 291 feet bgs. Water delivered by the Old River MWC system contains uranium levels that exceed the MCL of 30 µg/L established by State and federal regulations. Water from this well also exceeds the 1, 2, 3-TCP MCL of 0.005 µg/L. The Old River MWC well lacks source reliability and storage capacity to serve the customers. The MWC also lacks technical, managerial, and financial capacity.

South Kern MWC provides water to 32 residents via 15 service connections in its 9.7-acre service area.

Water is provided by a single well in the northeast corner of the service area. The South Kern MWC well was constructed in 1959 and has a ten-inch diameter steel casing perforated from 230 to 337 feet bgs.

The well currently produces water that exceeds the uranium MCL of 30 µg/L. Water from this well also exceeds the 1, 2, 3-TCP MCL of 0.005 µg/L. The South Kern MWC well also lacks source reliability and storage capacity to serve the customers. The MWC also lacks technical, managerial, and financial capacity.

Floodplain
The proposed project is located on Federal Emergency Management Agency (FEMA) panel 06029C2300E effective September 26, 2008 (FEMA 2024). The proposed project is not located within a 100-year floodplain.

Impact Analysis
a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?
Less Than Significant Impact with Mitigation Incorporated. The proposed project would abandon the Old River MWC well and South Kern MWC well and extend the City of Bakersfield’s water system to serve the areas previously served by these two MWCs. To extend service from the City of Bakersfield’s water system to the areas currently served by Old River MWC and South Kern MWC, the proposed project would construct approximately 6,000 linear feet of new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines with connections to 29 households. Three fire hydrants would also be installed, and two wells would be abandoned as part of the proposed project. Construction of the proposed project would require surface disturbance, which may include the removal of stabilizing surfaces, excavation, and backfill. Potential water quality impacts associated with the proposed project could include short-term construction-related discharge of pollutants in the Stine Canal.

Projects that disturb one acre of soil or more are required to obtain NPDES coverage under the NPDES Construction General Permit (CGP). Construction activities subject to the CGP include clearing, grading, and other ground disturbances such as stockpiling or excavation. The CGP requires the development and implementation of a SWPPP, which would include construction and operational BMPs to reduce on-site soil erosion and subsequent pollution of stormwater runoff, ultimately protecting California’s surface Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 59 water resources. As the proposed project would disturb greater than one acre, a SWPPP would be prepared and BMPs would be implemented. Development and implementation of a site-specific SWPPP, as well as construction and operational BMPs, would reduce the proposed project’s potential to violate any water quality standards, waste discharge requirements, or otherwise substantially degrade surface or ground water quality. Where the proposed project would cross the Stine Canal, jack and bore construction would be used to install the pipeline underneath the canal. Project construction would take place primarily during agricultural season, during which it is anticipated that the canal could have flow.

The Stine Canal is an earthen canal, and there is potential for groundwater intrusion during jack and bore construction. Implementation of Mitigation Measure HYD-1 would require detailed dewatering methods and coordination with the Kern Delta Water District. Any potential shoring activities required for the jack and bore operation to connect the pipeline under the Stine Canal would be prepared in accordance with local engineering standards.

Upon completion of construction, project components would be located underground and would not result in runoff that could degrade water quality. With implementation of construction BMPs required by the project-specific SWPPP, and implementation of Mitigation Measure HYD-1, impacts related to water quality would be less than significant with mitigation incorporated.

HYD-1 Prepare and Implement Dewatering and Shoring Plans. In the event that dewatering activities are implemented for any construction activities, a dewatering plan shall be submitted to the City for approval before the issuance of a grading permit. At a minimum, the dewatering plan shall include dewatering methods, location of dewatering activities, equipment, groundwater sampling, disposal, and discharge point in accordance with the applicable waste discharge requirements of the Central Valley Regional Water Quality Control Board. In the event that shoring methods are implemented for any excavations, shoring plans shall be prepared and submitted to the City for approval before the issuance of a grading permit. Shoring activities required for the jack and bore operations to connect utility lines under the Stine Canal shall be prepared in accordance with the City engineering standards. Additionally, the project applicant shall coordinate with the Kern Delta Water District regarding boring under Stine Canal, and any applicable recommendations shall be implemented.
b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin? Less Than Significant Impact. Old River MWC and South Kern MWC currently provide water service to residential and commercial customers in the project area. Each MWC operates using a single well, located within their respective service areas, which provides water to adjacent parcels and nearby customers. The proposed project would extend water service from the City of Bakersfield to this area and the South Kern and Old River wells would be abandoned.

Construction of the pipelines would be mainly subterranean and would take place within the ROW of Old River Road, SR-119, Par Street, and Beam Street. The pipeline trench depth is expected to be between four and ten feet, with a total excavation width of five feet. The proposed project would require a trenchless crossing underneath Old River Road, the Stine Canal, SR-119, and an existing culvert.

After completion of the proposed construction, the roadways would return to their existing condition.

As the proposed pipelines would be constructed within existing road ROW, there would be minimal Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 60 increase in the amount of impervious surface at the project site. Additionally, the proposed project would not require the withdrawal of groundwater. Once the project is implemented, operation of the South Kern and Old River MWC wells will cease and they will no longer draw from local groundwater.

Therefore, the proposed project would not decrease groundwater supplies or interfere with groundwater recharge, and the impact would be less than significant. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i. Result in substantial erosion or siltation on- or off-site? Less Than Significant Impact. The proposed project would install approximately 6,000 linear feet of a new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines, and 29 household connections.

Three fire hydrants would also be installed, and two wells would be abandoned as part of the proposed project. The new 10-inch water main would be located within the disturbed portions of Old River Road and Taft Highway, and the proposed 8-inch lateral pipelines and household connections would be located within disturbed portions of Par Street, Beam Street, and front yards of existing residences. The proposed project would require a jack and bore crossing underneath Old River Road, the Stine Canal, SR119, and an existing culvert.

Construction of the proposed project would require surface disturbance, which may include the removal of stabilizing surfaces, excavation, and backfill. However, after completion of construction activities, these surfaces would be restabilized, and there would be no change of erosion potential in the project area. Additionally, as the majority of the proposed project would be subterranean and within existing road ROW, the potential for erosion would be minimized. As outlined in question a), potential shortterm impacts from construction would be addressed through conformance with applicable elements of the NPDES CGP, including preparation and implementation of a SWPPP. The SWPPP would implement BMPs during construction to reduce on-site erosion of disturbed soil. Therefore, with implementation of the SWPPP and BMPs, the proposed project would not result in substantial soil erosion or the loss of topsoil, and impacts would be less than significant.
ii. Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site?
Less Than Significant Impact. As described in question b), construction of the pipelines would be mainly subterranean and would take place within the ROW of Old River Road, SR-119, Par Street, and Beam Street. The pipeline trench depth is expected to be between four and ten feet, with a total excavation width of five feet. The proposed project would require a trenchless crossing underneath Old River Road, the Stine Canal, SR-119, and an existing culvert.

After completion of the proposed construction, the roadways would return to their existing condition.

As the proposed pipelines would be constructed within existing road ROW and roads would remain the same width, there would be no increase in the amount of impervious surface at the project site.

Therefore, the proposed project would not substantially increase the rate or amount of surface runoff that would result in flooding on- or off-site and the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 61 iii. Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional resources of polluted runoff? Less Than Significant Impact. As described in question b), construction of the pipelines would be mainly subterranean and would take place within the ROW of Old River Road, SR-119, Par Street, and Beam Street. The pipeline trench depth is expected to be between four and ten feet, with a total excavation width of five feet. The proposed project would require a trenchless crossing underneath Old River Road, the Stine Canal, SR-119, and an existing culvert. As the proposed pipelines would be constructed within existing roadways and roadways would return to their existing conditions after construction, there would be no increase in the amount of impervious surface at the project site.

Additionally, as described in question a), potential short-term impacts from construction would be addressed through conformance with applicable elements of the NPDES CGP, including preparation and implementation of a SWPPP. The SWPPP would implement BMPs during construction to reduce on-site erosion of disturbed soil and to prevent substantial polluted runoff from entering the stormwater drainage system. Therefore, the proposed project would not create or contribute runoff water which would exceed the capacity of stormwater drainage systems and the impact would be less than significant.
iv. Impede or redirect flood flows?
Less Than Significant Impact. As described in question b), construction of the pipelines would be mainly subterranean and would take place within the ROW of Old River Road, SR-119, Par Street, and Beam Street. The pipeline trench depth is expected to be between four and ten feet, with a total excavation width of five feet. The proposed project would require a trenchless crossing underneath Old River Road, the Stine Canal, SR-119, and an existing culvert. After completion of the proposed construction, the roadways would return to their existing condition. As the proposed pipelines would be constructed within existing road ROW, there would be minimal increase in the amount of impervious surface at the project site.

Additionally, the proposed project is located on FEMA panel 06029C2300E effective September 26, 2008 (FEMA 2024). The proposed project is not located within a 100-year floodplain. Therefore, the proposed project would not impede or redirect potential flood flows and the impact would be less than significant. d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? Less Than Significant Impact. As described in question c.iv), the proposed project is not located within a 100-year floodplain. The proposed project site is not at risk of inundation due to a tsunami as it is located approximately 70 miles east of the Pacific Ocean. Additionally, the proposed project site is not subject to seiche as the nearest lake or reservoir, Lake Webb, is located approximately 8 miles southwest of the project site. Therefore, the impact would be less than significant. e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
Less Than Significant Impact. The proposed project would comply with the Water Quality Control Plan for the Tulare Lake Basin and NPDES Stormwater Program by implementing a SWPPP and BMPs to prevent construction pollutants from violating any water quality standards or waste discharge requirements. Additionally, the proposed project is within the Kern County Subbasin of the San Joaquin Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 62 Valley Groundwater Basin Groundwater Sustainability Plan (GSP; County 2024a). The proposed project does not involve pumping or extraction of groundwater, and following construction of the pipeline, the roadways would return to their existing condition. Therefore, the proposed project would comply with the Kern County Subbasin GSP, and the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 63 XI. LAND USE AND PLANNING
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Physically divide an established community? ☐ ☐ ☐ ☒
b) Cause significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental
effect?
☐ ☐ ☒ ☐
Environmental Setting
The proposed project is located partially within the City of Bakersfield city limits and partially within unincorporated Kern County. The proposed project consists of the construction of a water main and laterals which would connect the City of Bakersfield water system to the unincorporated community of Old River in Kern County. The proposed water main would connect to an existing water main located at the intersection of McCutcheon Road and Old River Road within the City limits. The new pipeline would then run approximately one mile south along Old River Road to its intersection with SR-119, where the proposed pipeline would run east and connect to the Old River community. The land adjacent to the proposed project to the west of Old River Road is within the Bakersfield city limits. The land to the east of Old River Road and to the south of SR-119, including the community of Old River, is located in unincorporated Kern County.

General Plan Land Use Designation
The proposed pipeline extension would begin at the intersection of McCutchen Road and Old River Road and would run approximately one mile south along Old River Road to the Old River community. Land along the western side of Old River Road falls within the city limits and is designated primarily as low density residential and resource-intensive agricultural, with some parcels designated as general commercial and estate residential near the intersection with SR-119 (City 2024b). Land to the east of Old River Road lies within County jurisdiction and is designated primarily as resource-intensive agricultural, with a few parcels designated as heavy commercial and general commercial near the intersection with SR-119. Land in the community of Old River lies in the County jurisdiction and is designated as low density residential and consists mainly of single-family residential units and some commercial development (County 2024b).

Zoning Classification
Land to the west of Old River Road in the City of Bakersfield is primarily zoned for residential development (R-1 One Family Dwelling and P.U.D. Planned Unit Development), with an area zoned for commercial activities at the northwest corner of SR-119 and Old River Road. Land to the east of Old River Road in unincorporated Kern County is primarily zoned for agricultural activities (A, Exclusive Agriculture), with a small area at the northeast corner of the intersection of SR-119 and Old River Road zoned for commercial activities (CH, Highway Commercial, and C-2, General Commercial). In the Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 64 community of Old River, the parcels bordering SR-119 are zoned for commercial use (CH, Highway Commercial, and C-2, General Commercial). The rest of the community is zoned for residential use (R-2, Medium Density Residential). South of SR-119, the areas surrounding the community of Old River to the west, south, and east are zoned for agricultural use (County 2024b).

Impact Analysis
a) Physically divide an established community?
No Impact. The proposed project would provide new water service connections from the Bakersfield water system to the existing residential and commercial users within the unincorporated Old River community. The proposed project would involve the construction of a 10-inch water main within the disturbed portions of Old River Road and SR-119, three fire hydrants, 8-inch lateral pipelines within the residential portion of the site, and 29 household connections. The proposed fire hydrants, 8-inch lateral pipelines, and household connections would be located within disturbed portions of Par Street, Beam Street, and front yards of existing residences. The pipelines would operate passively underground and would not physically divide an existing community. No impact would occur. b) Cause significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Less Than Significant Impact. As mentioned above in question a), the proposed project would be installed underground within the road ROW and front yards of existing residences and would not result in changes to land use types in the project area. During construction, staging would occur along the road ROW and would not result in changes to land uses. Therefore, the proposed project would not result in changes to land use and would not result in other land use policy conflicts, and impacts would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 65 XII. MINERAL RESOURCES
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Result in the loss of availability of a known mineral resource that would be of value to the region and the
residents of the state?
☐ ☐ ☐ ☒
b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local
general plan, specific plan or other land use plan?
☐ ☐ ☐ ☒
Environmental Setting
Mineral resources in Kern County include borax, cement production, petroleum, and construction aggregates (County 2004). The Kern County General Plan Land Use, Open Space, and Conservation Element (General Plan) outlines policies to protect the current and future extraction of mineral resources that provide value to Kern County (County 2009). The Surface Mining and Reclamation Act of 1975 (SMARA) was enacted in response to land use conflicts between urban growth and essential mineral production. It requires the California Geological Survey to classify California lands into mineral resource zones (MRZs), defined as follows:
• MRZ-1: areas where adequate information indicates that no significant mineral deposits are present or where it is judged that little likelihood exists for their presence. • MRZ-2: areas where adequate information indicates that significant mineral deposits are present or where it is judged that a high likelihood for their presence exists. • MRZ-3: areas containing mineral deposits, the significance of which cannot be evaluated from available data.
• MRZ-4: areas where available information is inadequate for assignment into any other MRZ.

Kern County contains MRZs designated as MRZ-1 and MRZ-2. Policy 17 of The General Plan Land Use, Conservation, and Open Space Element states that lands classified as MRZ-2 should be protected from encroachment of incompatible land uses. The project site is located approximately four miles north of a designated MRZ-1 and approximately six miles southwest of a designated MRZ-2. Policy 25 aims to discourage incompatible land use adjacent to map code 8.4 (Mineral and Petroleum areas). The proposed project site is located approximately eight miles east of a Mineral and Petroleum area. No mining activity occurs on the project site, and the nearest mine is located approximately 15 miles from the project site (County 2024c).

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 66 Impact Analysis
a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? No Impact. The proposed project site is not located within the immediate vicinity of a designated mineral resource zone and would not encroach upon Mineral and Petroleum land use designations. The construction and operation of the proposed project would occur primarily within the disturbed areas of existing roadways. Therefore, there is little to no potential for mineral resource recovery to occur within the project site. The proposed project would not result in the loss of availability of mineral resources or a delineated mineral resource recovery site. No impact to mineral resources would occur.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 67 XIII. NOISE
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project result in:
a) Generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
☐ ☐ ☒ ☐
b) Generation of excessive groundborne vibration or
groundborne noise levels? ☐ ☐ ☒ ☐
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people
residing or working in the project area to excessive noise levels?
☐ ☐ ☐ ☒
HELIX conducted quantitative modeling related to noise generated by the proposed project using the Roadway Construction Noise Model (RCNM). The RCNM output files are attached to this Initial Study as Appendix D.

Noise Metrics
All noise-level and sound-level values presented herein are expressed in terms of decibels (dB), with A weighting, abbreviated “dBA,” to approximate the hearing sensitivity of humans. Time averaged noise levels of one hour are expressed by the symbol “LEQ” unless a different time period is specified.

Maximum noise levels are expressed by the symbol “LMAX.” Because decibels are logarithmic units, SPL cannot be added or subtracted through standard arithmetic.

Under the decibel scale, a doubling of sound energy corresponds to a 3 dBA increase. In other words, when two identical sources are each producing sound of the same loudness, the resulting sound level at a given distance would be 3 dBA higher than from one source under the same conditions. For example, if one automobile produces an SPL of 70 dBA when it passes an observer, two cars passing simultaneously would not produce 140 dBA—rather, they would combine to produce 73 dBA. Under the decibel scale, three sources of equal loudness together produce a sound level 5 dBA louder than one source.

Under controlled conditions in an acoustical laboratory, the trained, healthy human ear is able to discern 1 dBA changes in sound levels, when exposed to steady, single-frequency (“pure-tone”) signals in the mid-frequency (1,000 Hertz [Hz]–8,000 Hz) range. In typical noisy environments, changes in noise of 1 to 2 dBA are generally not perceptible. It is widely accepted, however, that people begin to detect sound level increases of 3 dB in typical noisy environments. Further, a 5 dBA increase is generally Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 68 perceived as a distinctly noticeable increase, and a 10 dBA increase is generally perceived as a doubling of loudness.

Vibration Metrics
Groundborne vibration consists of rapidly fluctuating motions or waves transmitted through the ground with an average motion of zero. Sources of groundborne vibrations include natural phenomena and anthropogenic causes (e.g., explosions, machinery, traffic, trains, construction equipment). Vibration sources may be continuous (e.g., factory machinery) or transient (e.g., explosions). Peak particle velocity (PPV) is commonly used to quantify vibration amplitude. The PPV, with units of inches per second (in/sec), is defined as the maximum instantaneous positive or negative peak of the vibration wave.

Noise and Vibration Sensitive Land Uses
Noise-sensitive land uses (NSLU) are land uses that may be subject to stress and/or interference from excessive noise, such as residential dwellings, schools, transient lodgings (hotels), hospitals, educational facilities, and libraries. Industrial and commercial land uses are generally not considered sensitive to noise. Noise receptors are individual locations within an NSLU that may be affected by noise. The nearest existing NSLU to the proposed project are single-family residential homes located 50-feet from the proposed water mains. The closest school is Independence High School located approximately 350 feet northwest of the northern terminus of the proposed 10-inch water main along Old River Road.

Land uses in which ground-borne vibration could potentially interfere with operations or equipment, such as research, hospitals, and university research operations are considered “vibration-sensitive.” The degree of sensitivity depends on the specific equipment that would be affected by the ground-borne vibration. In addition, excessive levels of ground-borne vibration of either a regular or an intermittent nature can result in annoyance to residential uses, schools, or transient lodging. Land uses in the project area that are subject to annoyance from vibration include the residences described above. Groundborne vibration can also cause structural damage or architectural damage (e.g., cracking plaster) to buildings.

Regulatory Framework
Kern County Code of Ordinances
The Kern County code of ordinances contains the following section applicable to project construction noise:

8.36.020 Prohibited sounds.

It is unlawful for any person to do, or cause to be done, any of the following acts within the unincorporated areas of the county:

H. Create noise from construction, between the hours of nine (9:00) p.m. and six (6:00) a.m. on weekdays and nine (9:00) p.m. and eight (8:00) a.m. on weekends, which is audible to a person with average hearing faculties or capacity at a distance of one hundred fifty (150) feet from the construction site, if the construction site is within one thousand (1,000) feet of an occupied residential dwelling except as provided below:

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 69 1. The development services agency director or his designated representative may for good cause exempt some construction work for a limited time.

2. Emergency work is exempt from this section.

City of Bakersfield Municipal Code
The City of Bakersfield municipal code contains the following section applicable to project construction noise:

9.22.050 Noise during construction.

A. Except as provided herein or in subsection B, C or D of this section, it is unlawful for any person, firm or corporation to erect, demolish, alter or repair any building, or to grade or excavate land, streets or highways, other than between the hours of six a.m. and nine p.m. on weekdays, and between eight a.m. and nine p.m. on weekends; provided, however, that city crews and those of the city’s contractors performing street work between nine p.m. and six a.m. are exempt here from if the city engineer has directed that work be performed between such hours to alleviate potential traffic congestion.

B. Notwithstanding any other provisions of this chapter, if the city manager determines that the public health and safety will not be impaired by the erection, demolition, alteration or repair of any building or the excavating and grading of land, streets or highways between the hours of nine p.m. and six a.m., and if he or she further determines that loss or inconvenience would result to any party in interest by virtue of the requirements provided in subsection A of this section, he or she may grant a permit for such work to be done between the hours of nine p.m. and six a.m., upon application being made at the time the permit for the work is awarded or during the progress of the work. Such permit may be granted for a period not to exceed three days, and may be extended by the city manager for a period not to exceed three days.

C. The provisions of this section shall not apply to any work of construction performed one thousand feet or more from the nearest residential dwelling.

D. The provisions of this section shall not apply to performance of emergency work as defined in this chapter.

Impact Analysis
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Less Than Significant Impact. Proposed project construction work would occur outside the City limits, however, some noise sensitive land uses along the pipeline alignments are within the City limits.

Therefore, both the Kern County code of ordinances and the City municipal code are considered in evaluation of project construction noise impacts.

Construction of the proposed project is anticipated to begin April 1, 2026, and be completed on December 31, 2026. Most of the pipeline would be installed using convention trenching, commonly Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 70 known as “cut-and-cover”. A short portion of the 10-inch pipeline would be installed underneath an existing irrigation canal/culvert using trenchless tunneling and installation of pipe commonly known as “jack-and-bore”. Construction equipment would include backhoes, concrete saws, excavators, pipelayers, trenchless tunneling machines, pavers, vibratory rollers, and water trucks. Construction equipment would not all operate at the same time or location and would not be in constant use during the 8-hour operating day. Noise produced by the construction equipment was calculated using the RCNM Version 1.1 (US Department of Transportation [USDOT] 2008). The loudest anticipated construction equipment would be a concrete saw which could be used 50 feet from single-family residences during pavement demolition. The calculated noise from a concrete saw at a distance of 50 feet would be 82.6 dBA LEQ. The RCNM results are attached to this Initial Study as Appendix D. Per the both the County ordinance Section 8.36.020 and City ordinance section 9.22.050, there are no standards for allowable construction noise levels, however construction work is unlawful except between the hours of 6:00 a.m. and 9:00 p.m. on weekdays, and between 8:00 a.m. and 9:00 p.m. on weekends. Both ordinance sections provided that, if the Kern County development services agency or City manager have determined that, for good cause, construction work may be exempted from the above construction hours limitation for a limited time. Compliance with the Kern County and City ordinances for construction noise hours would ensure that disturbance of nearby NSLUs would be minimized and less than significant.

The proposed project would not install any new operational noise generating equipment such as new pumps or new emergency backup generators. Project periodic maintenance activities would be similar to activities currently conducted for the existing water systems and would not result in any new operational noise.

Therefore, the construction and operation of the proposed project would not result in the generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the proposed project in excess of standards established in the local general plan or noise ordinance. The impact would be less than significant.
b) Generation of excessive groundborne vibration or groundborne noise levels? Less Than Significant Impact. Construction activities would result in groundborne vibration from the use of heavy construction equipment, but it is not anticipated that project construction would require blasting or pile drivers. The largest potential source of vibration during project construction would be a vibratory roller primarily used to achieve soil compaction and pavement compaction, which could be used as close as 50 feet from the nearest vibration sensitive land uses (single-family residences). Per the Federal Transit Administration’s Transit Noise and Vibration Impact Assessment Manual, a large vibratory roller could create approximately 0.210 in/sec PPV at a distance of 25 feet (FTA 2018). A vibratory roller producing a 0.210 in/sec PPV vibration level could result in vibrations as high as 0.10 in/sec PPV at a distance of 50 feet2
, below the FTA’s building damage threshold for groundborne vibration of 0.2 in/sec PPV for non-engineered timber and masonry buildings (FTA 2018). Therefore, project construction activities would not result in groundborne vibration exceeding the FTA standards at the closest vibration sensitive land uses. Once operational, the proposed project would not be a source of ground-borne vibration or ground-borne noise. Therefore, construction and operation of the 2 Equipment PPV = Reference PPV * (25/D)n (in/sec), where Reference PPV is PPV at 25 feet, D is distance from equipment to the receiver in feet, and n = 1.1 (the value related to the attenuation rate through the ground); formula from FTA 2018.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 71 proposed project would not result in excessive ground-borne vibration or ground-borne noise levels.

The impact would be less than significant.
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? No Impact. The nearest airport or private airstrip to the project site is the Bakersfield Municipal Airport located approximately 7 miles to the east. The project site is not with the Bakersfield Municipal Airport influence area or any of the airport noise contours (County 2012). Therefore, the proposed project would not expose people residing or working in the project area to excessive noise levels from aircraft or airport operations. There would be no impact.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 72 XIV. POPULATION AND HOUSING
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new
homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
☐ ☐ ☒ ☐
b) Displace substantial numbers of existing people or
housing, necessitating the construction of replacement
housing elsewhere?
☐ ☐ ☐ ☒
Environmental Setting
The proposed project is in unincorporated Kern County immediately adjacent to the City of Bakersfield.

The proposed project would provide the unincorporated Old River community with water supply from the City of Bakersfield water system.

In 2021, the population of Kern County as a whole was 905,644, with 398,756 of those residents living in the City of Bakersfield (County 2024d). The current population of the Old River community is approximately 78. The County of Kern Draft 2024-2031 Housing Element Update and Kern Council of Government’s 2022 Regional Transportation Plan anticipates a projected County population of 1,025,700 in 2030, which is a 13.2 percent increase from the U.S. Census Bureau population count of 905,644 in 2021 (County 2022; County 2024b).

Impact Analysis
a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
Less Than Significant Impact. Construction of the proposed project is expected to continue for approximately nine months and would likely draw from the existing labor pool in Kern County. The presence of construction workers at the project site would be temporary and would not require workers to relocate their households. Therefore, short-term increased employment of construction workers at the project site would not result in a substantial increase in population in the vicinity of the proposed project. Upon completion of construction, the extension of the Bakersfield water system and associated operational and maintenance would be handled by existing City staff. Construction and operation of the proposed project is not expected to generate an increase in employment that would increase the City or County population.

The Old River community is comprised of mostly single-family residences and some commercial uses, which would be served by the Bakersfield water system under the proposed project. The proposed project would consolidate the existing MWCs into the Bakersfield water system to provide the residents Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 73 in the Old River community area with a reliable, uncontaminated water supply. The proposed project would install 29 household connections in the unincorporated community of Old River and would not extend infrastructure beyond the existing households. As discussed above, the County of Kern Draft 2024-2031 Housing Element anticipates a countywide population increase of approximately 13.2 percent by 2030. The Old River area is a small community bordered by land zoned for agricultural use, and therefore it is unlikely that the extension of City water service to this area would induce substantial population growth beyond what has been anticipated in the General Plan. The proposed project would not induce substantial unplanned population growth in the Old River community or surrounding areas, and the impact would be less than significant.
b) Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
No Impact. The proposed project would install approximately 6,000 linear feet of 10-inch water main and 1,600 linear feet of 8-inch lateral pipelines with connections to 29 households underground within disturbed areas of Old River Road, SR-119, Par Street, Beam Street, and the front yards of existing residences. Construction staging would occur within the road ROW and would not displace existing people or housing or necessitate the construction replacement housing. No impact would occur.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 74 XV. PUBLIC SERVICES
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
a) Fire protection? ☐ ☐ ☒ ☐
b) Police protection? ☐ ☐ ☒ ☐
c) Schools? ☐ ☐ ☒ ☐
d) Parks? ☐ ☐ ☒ ☐
e) Other public facilities? ☐ ☐ ☒ ☐
Environmental Setting
The proposed project would install a water main along the border of the Bakersfield city limits which would provide water service to the community of Old River in unincorporated Kern County. This community receives public services provided by both Kern County and the City of Bakersfield, discussed in greater detail below.

The project site falls within the fire protection authority of Kern County Fire Department (KCFD). KCFD has 47 full-time fire stations. The nearest KCFD fire station to the project site is Kern County Fire Station 53, located in the Old River community (County 2024e).

The Kern County Sheriff’s Office (KCSO) provides police protection services to the unincorporated areas of the County. KCSO headquarters are in the City of Bakersfield and include 15 substations. The nearest KCSO station to the project site is the Lamont Substation, located approximately 11 miles to the east (County 2024f).

Kern County is served by 46 K-12 school districts, and the project site is within the Kern High School District and Lakeside Union School District boundaries. The nearest schools to the project site in these districts are Independence High School, located approximately 350 feet northwest of the northern terminus of the proposed water main, and Donald E. Suburu Elementary School, located approximately 3 miles northeast (County 2024g).

Kern County Parks and Recreation manages eight regional parks and 40 neighborhood parks (County 2024h). The City of Bakersfield Recreation and Parks Department manages 63 public parks (City 2024c).

Existing parks within the vicinity of the project site include Greystone Park, located approximately 2.5 miles northwest of the site; Wilderness Park and Tradewinds Park, each located approximately 2.7 miles northeast of the site; Silver Creek Park, located approximately 3 miles northeast of the site; Coral Keys Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 75 Park, located approximately 3.3 miles northeast of the site; Stone Creek Park, located approximately 3.4 miles east of the site; Seasons Park, located approximately 3.5 miles northeast of the site; and Tevis Park, located approximately 3.8 miles north of the site.

Impact Analysis
Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
a) Fire protection?
b) Police protection?
c) Schools?
d) Parks?
e) Other public facilities?
Less Than Significant Impact. The project site receives fire and police protection services from the Kern County Fire Department and Kern County Sheriff’s Office. As discussed in Section 4.XIV, Population and Housing, the proposed extension of the Bakersfield water system services to the Old River community may result in indirect, less than significant impacts to population growth in the community due to the provision of reliable, uncontaminated water services. The proposed project would operate passively underground and would not require the installation of aboveground structures that would require fire or police protection during operation. However, there may be potential for a minimal increase in fire or police protection during the nine-month construction period due to increased construction personnel and risk for accidents on-site. These potential public service demands would be minimal and could be served by the existing staff of the KCFD and KCSO.

The project site is served by the Kern High School District and Lakeside Union School District. As discussed in Section 4.XIV, Population and Housing, the proposed extension of Bakersfield water system services to the Old River community area may result in indirect, less than significant impacts to population growth in the community due to the provision of reliable, uncontaminated water services.

However, the potential for population growth would be minimal and would not overburden the surrounding school districts or schools.

The project site is located within four miles of eight public parks managed by the City of Bakersfield Recreation and Parks Department which are all located roughly north and east of the site within Bakersfield city limits. As discussed in Section 4.XIV, Population and Housing, the proposed extension of Bakersfield water system services to the Old River community area may result in indirect, less than significant impacts to population growth in the community due to the provision of reliable, uncontaminated water services. However, the potential for population growth would be minimal and would not overburden the existing park facilities.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 76 As detailed above and in Section 4.XIV, Population and Housing, the proposed project may indirectly induce less than significant impacts to population growth in the Old River community area due to the provision of reliable, uncontaminated water services from the proposed extension to the Bakersfield water system. This potential for less than significant increases in the population of the Old River community area may result in minor demand increases for the aforementioned public services, but not beyond their existing capacity. Therefore, impacts to public services would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 77 XVI. RECREATION
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
☐ ☐ ☐ ☒
b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the
environment?
☐ ☐ ☐ ☒
Environmental Setting
Kern County Parks and Recreation and the City of Bakersfield Recreation and Parks Department manage regional and community parks in the vicinity of the proposed project. According to the 2010 Kern County Parks and Recreation Master Plan, Kern County contains 4,726 acres of park land with 4,282 acres of regional parks and 389 acres of local neighborhood parks, both leased and owned by the County (County 2010). As described in Section 4.XV, Public Services, the project site is located within four miles of eight neighborhood parks, including: Greystone Park, located approximately 2.5 miles northwest of the site; Wilderness Park and Tradewinds Park, each located approximately 2.7 miles northeast of the site; Silver Creek Park, located approximately 3 miles northeast of the site; Coral Keys Park, located approximately 3.3 miles northeast of the site; Stone Creek Park, located approximately 3.4 miles east of the site; Seasons Park, located approximately 3.5 miles northeast of the site; and Tevis Park, located approximately 3.8 miles north of the site.

Impact Analysis
a) Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? Less Than Significant Impact. As discussed in Section 4.XIV, Population and Housing, proposed project construction would be temporary and is not expected to require the relocation of construction workers to the project site area. Once constructed, the proposed project would provide residents in the Old River community with a reliable, uncontaminated water supply. The project area is adequately served by parks in the vicinity, and construction of the proposed project would not result in a substantial increase in the use of the existing parks such that deterioration would occur. The impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 78 b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? No Impact. The proposed project would include the extension of a water main from the Old River community to the existing water main in the City of Bakersfield and would not construct any recreational facilities. Additionally, the proposed project would not substantially induce population growth that would require the construction or expansion of park or recreational facilities, as discussed above, such that an adverse physical effect on the environment would occur. No impact would occur.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 79 XVII. TRANSPORTATION
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Conflict with a program plan, ordinance or policy
addressing the circulation system, including transit,
roadway, bicycle and pedestrian facilities?
☐ ☒ ☐ ☐
b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)? ☐ ☐ ☒ ☐
c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?
☐ ☐ ☐ ☒
d) Result in inadequate emergency access? ☐ ☐ ☒ ☐
Environmental Setting
The following roadways provide primary circulation within the vicinity of the proposed project:
• Old River Road is a major north-south 2-lane arterial roadway that traverses unincorporated Kern County and the City of Bakersfield from SR-38 (Stockdale Highway) in the City of Bakersfield to Highway 166 (Maricopa Highway).
• SR-119 (Taft Highway) is an east-west 2-lane arterial highway that traverses unincorporated Kern County and the City of Bakersfield from SR-33 in the City of Taft to SR-99 in the City of Bakersfield.
• Par Street is a local north-south residential roadway that traverses the unincorporated Old River community from SR-119 to Beam Street.
• Beam Street is a local east-west residential roadway that traverses the unincorporated Old River community from Old River Road to Par Street.

According to the current transit routes and schedules posted by Kern Regional Transit, the proposed project would not be located along an existing bus route and the roadways discussed above that are expected to be used during construction and operation of the proposed project do not have bus stops (County 2024i). Passenger rail service in Kern County is provided from Bakersfield north to Sacramento via Amtrak’s San Joaquin Train Service; however, a direct route from the project site or immediate vicinity is not available (Amtrak 2024).

The Kern Council of Governments 2022 Regional Transportation Plan defines the following bikeway and pedestrian facilities in the Kern County (County 2022):

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 80 • Class I facilities are paved right-of-way for exclusive use by bicyclists, pedestrians, and those using non-motorized modes of travel.
• Class II bike lanes are defined by pavement striping and signage used to allocate a portion of a roadway for bicycle travel. Several jurisdictions have variations on Class II facilities, which provide optional striping scenarios to allow on-street parking. • Class III facilities include sign markings for bicycle routes. There are no pavement markings. The County also has a Class III variation that provides a 4-foot delineated shoulder and bicycle route signage in rural areas.

The Kern County Interactive County Map identifies existing and future bikeways within and in the vicinity of the project site (County 2024b). No existing Class I, II, or III bikeways are identified within the project site; however, a series of future Class II bikeways are identified along SR-119, Old River Road, and other roadways in the vicinity of the project site. According to the Kern County Public Works “Walk Kern” project, no existing pedestrian facilities are identified or proposed for improvement in the vicinity of the project site (County 2024j).

Impact Analysis
a) Conflict with a program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities?
Less Than Significant Impact with Mitigation Incorporated. The proposed 10-inch water main would run approximately one mile along Old River Road from the intersection at Old River Road and McCutchen Road in the City of Bakersfield to the intersection of Old River Road and SR-119 in the unincorporated Old River community. From there, the water main would run approximately 500 feet east along SR-119 to the intersection of SR-119 and Par Street and would then run approximately 800 feet south along Par Street to the intersection at Par Street and Beam Street. Sixteen household connections would branch off from Par Street to the east and west to the existing residences. The proposed water main would run approximately 450 feet west along Beam Street from the intersection at Beam Street and Old River Road. Thirteen household connections would branch off from Beam Street to the north and south to the existing residences. Construction of the pipeline would take place within the front yards of existing residences and within disturbed portions of Old River Road, SR-119, Par Street, and Beam Street, which may result in temporary disturbance to traffic or lane closures along these roads due to interference from construction vehicles.

The proposed project is not located in the immediate vicinity of existing public transit, bikeways, or pedestrian facilities. Construction of the proposed project would not interfere with local circulation patterns because construction would be taking place along the shoulder of the roads. Any roadway interference during construction would be short-term and temporary. Full closure of these roads is not anticipated, but individual lanes may be temporarily closed during construction. Mitigation Measure HAZ-1 would require the development and implementation of a Traffic Management Plan which would manage any changes to traffic patterns during construction activities. After construction, the roads would be returned to their pre-project conditions. Operations of the proposed project would not affect the local street network because all infrastructure related to the proposed project would be underground, with the exception of the three fire hydrants which would not interfere with local roads.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 81 Therefore, the proposed project would not interfere with local policies or plans addressing circulation, and the impact would be less than significant with mitigation incorporated. b) Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)? Less Than Significant Impact. According to the Governor’s Office of Planning and Research (OPR) Technical Advisory on Evaluating Transportation Impacts in CEQA, small land use projects that would generate or attract fewer than 110 trips per day generally may be assumed to cause a less than significant impact related to vehicle miles traveled (VMT) (OPR 2018). Operation of the proposed project would occur passively underground and may require occasional trips by City employees for maintenance activities; however, these trips are expected to occur on an as-needed-basis and would not generate substantial VMT. Installation of the pipeline would require the excavation and backfill of approximately 4,000 cubic yards of soil, and no soil or other construction waste is expected to be transported off-site.

Proposed project construction would require heavy construction equipment that would be transported to the project site, and it is expected that the majority of this equipment would remain on-site until construction is completed. Total project construction time is estimated to be nine months. Because the trips generated by the proposed project during construction and operation of the proposed project would be less than the 110 trips per day threshold established by OPR, the impact related to VMT would be less than significant.
c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? No Impact. The proposed project would include the installation of water mains and household connections underground and does not propose the construction of new roadways or reconfiguration of existing roadways. Therefore, the project would not increase hazards due to a geometric design feature or incompatible use. No impact would occur.
d) Result in inadequate emergency access?
Less Than Significant Impact. Proposed project construction is anticipated to continue for approximately nine months and would require the use of heavy construction vehicle equipment including excavators, trenchers, compactors, and pipe layers. As discussed in question a), construction of the pipeline would take place within disturbed portions of Old River Road, SR-119, Par Street, and Beam Street, which may result in less than significant impacts due to temporary disturbance to traffic or lane closures along these roads from construction vehicle interference. At the conclusion of construction, the roads would return to their pre-project conditions and would accommodate emergency vehicle access. Operation of the project would not interfere with the local street network because all infrastructure would be located underground, with the exception of the three proposed fire hydrants, which would be located in the road shoulders and would not interfere with circulation. Impacts would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 82 XVIII. TRIBAL CULTURAL RESOURCES
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of
historical resources as defined in Public Resources
Code Section 5020.1(k), or
☐ ☒ ☐ ☐
ii. A resource determined by the lead agency, in its
discretion and supported by substantial evidence, to
be significant pursuant to criteria set forth in
subdivision (c) of Public Resources Code Section
5024.1. In applying the criteria set forth in
subdivision (c) of Public Resources Code Section
5024.1, the lead agency shall consider the
significance of the resource to a California Native
American tribe.
☐ ☒ ☐ ☐
Environmental Setting
According to PRC Section 21074, a resource is a tribal cultural resource if it is either:
1) Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following:
a. Included or determined to be eligible for inclusion in the California Register of Historical Resources; or
b. Included in a local register of historical resources as defined in PRC Section 5020.1(k). 2) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in PRC Section 5024.1(c). In applying the criteria set forth in PRC Section 5024.1(c), the lead agency shall consider the significance of the resource to a California Native American tribe.
3) A cultural landscape that meets the criteria of PRC Section 21074(a) to the extent that the landscape is geographically defined in terms of the size and scope of the landscape.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 83 4) A historical resource described in PRC Section 21084.1, a unique archaeological resource as defined in PRC Section 21083.2(g), or a “non-unique archaeological resource”, as defined in PRC Section 21083.2(h), if it conforms with the criteria of PRC Section 21074(a).

In accordance with PRC Section 21084.2, lead agencies are required to consider Tribal Cultural Resources (TCR) including a site feature, place, cultural landscape, sacred place or object, of cultural value to the tribe and is listed on the California Register of Historic Resources (CRHR) or a local register, or the Lead agency, at its discretion, chooses to treat resources as such.

In accordance with PRC Section 21080.3.1(b)(1), the following tribal contacts were informed by the City of the proposed project through formal notification on August 1, 2024:
• James Rambeau, Senior Chairperson; Big Pine Paiute Tribe of the Owens Valley • Sally Manning, Environmental Director; Big Pine Paiute Tribe of the Owens Valley • Danelle Gutierrez, Tribal Historic Preservation Officer; Big Pine Paiute Tribe of the Owens Valley • Julio Quair, Chairperson; Chumash Council of Bakersfield • Mariza Sullivan, Chairperson; Coastal Band of the Chumash Nation • Jairo F. Avila, Tribal Historic Preservation Officer; Fernandeño Tataviam Band of Mission Indians • Julie Turner, Secretary; Kern Valley Indian Community • Robert Robinson, Chairperson; Kern Valley Indian Community • Brandy Kendricks, Kern Valley Indian Community
• Delia Dominguez, Chairperson; Kitanemuk & Yowlumne Teion Indians • Donna Yocum, Chairperson; San Fernando Band of Mission Indians • Jessica Mauck, Director – CRM Department for the San Manuel Band of Mission Indians • Leo Sisco, Chairperson; Santa Rosa Rancheria Tachi Yokut Tribe • Octavio Escobedo III, Chairperson; Teion Indian Tribe • Colin Rambo, CRM Tech; Teion Indian Tribe
• Robert L. Gomez, Jr., Tribal Chairperson; Tubatulabals of Kern Valley • Neil Pevron, Chairperson; Tule River Indian Tribe
• Kenneth Woodrow, Chairperson; Wuksache Indian Tribe/ Eshom Valley Band • Mona Olivas Tucker, Chairwoman; yak tityu tityu yak tiłhini – Northern Chumash Tribe Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 84 As of the date of this report, the City has received responses from two tribes, neither of which requested consultation. No additional responses or requests for additional tribal coordination have been received.

Regulatory Framework
Federal Laws, Regulations, and Policies
No federal laws, regulations, or policies apply to Tribal Cultural Resources.

State Laws, Regulations, and Policies
Assembly Bill 52
AB 52, which was approved in September 2014 and effective on July 1, 2015, requires that CEQA lead agencies consult with California Native American tribes that are traditionally and culturally affiliated with the geographic area of a proposed project, if so requested by the tribe. The bill, chaptered in CEQA Section 21084.2, also specifies that a project with an effect that may cause a substantial adverse change in the significance of a TCR is a project that may have a significant effect on the environment.

Defined in Section 21074(a) of the Public Resources Code, TCRs are:

1. Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following:
a. Included or determined to be eligible for inclusion in the California Register of Historical Resources; or
b. Included in a local register of historical resources as defined in subdivision (k) of Section 5020.1.

2. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Section 5024.1. In applying the criteria set forth in subdivision (c) of Section 5024.1 for the purposes of this paragraph, the lead agency shall consider the significance of the resource to a California Native American tribe.

TCRs are further defined under Section 21074 as follows:
• A cultural landscape that meets the criteria of subdivision (a) is a TCR to the extent that the landscape is geographically defined in terms of the size and scope of the landscape; and • A historical resource described in Section 21084.1, a unique archaeological resource as defined in subdivision (g) of Section 21083.2, or a “nonunique archaeological resource” as defined in subdivision (h) of Section 21083.2 may also be a TCR if it conforms with the criteria of subdivision (a).

Mitigation measures for TCRs must be developed in consultation with the affected California Native American tribe pursuant to newly chaptered Section 21080.3.2, or according to Section 21084.3. Section 21084.3 identifies mitigation measures that include avoidance and preservation of TCRs and treating Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 85 TRCs with culturally appropriate dignity, considering the tribal cultural values and meaning of the resource.

Impact Analysis
a) Cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k)? ii. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1. In applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?
Less Than Significant with Mitigation Incorporated. The City of Bakersfield sent letters inviting tribes to consultation under AB 52 on August 1, 2024. As of the date of this report there has been no response.

While there is no record of tribal cultural resources in the vicinity of or on the project site, there is still potential for discovery as there would be ground -disturbing activities. With the implementation of Mitigation Measures CUL-1, Accidental Discovery of Cultural Resources, and CUL-2, Accidental Discovery of Human Remains, impacts would be less than significant for impacts ai) and aii).

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 86 XIX. UTILITIES AND SERVICE SYSTEMS
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm
water drainage, electric power, natural gas, or
telecommunications facilities, the construction or
relocation of which could cause significant environmental effects?
☐ ☒ ☐ ☐
b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development
during normal, dry and multiple dry years?
☐ ☐ ☒ ☐
c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected
demand in addition to the provider’s existing
commitments?
☐ ☐ ☐ ☒
d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
☐ ☐ ☒ ☐
e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste? ☐ ☐ ☒ ☐ Environmental Setting
Water
The project area is within the South Valley Floor Watershed with Region 5 – Tulare Lake Hydrologic Basin (CVRWQCB 2018). The SWRCB publishes updates to the Water Quality Control Plan for the Tulare Lake Basin (Basin Plan) to improve water quality and maintain beneficial uses in the drainage area of the San Joaquin Valley south of the San Joaquin River. The Basin Plan describes water quality concerns for the area that include agriculture, forestry, urban land uses, and stormwater runoff (CVRWQCB 2018).

Old River MWC and South Kern MWC currently provide water service to residential and commercial customers in the project area. Each MWC operates using a single well, located within their respective service areas, which provides water to adjacent parcels and nearby customers.

Old River MWC provides water to 46 residents via 14 connections in its 10.7-acre service area. Water is provided by a single well, located within the service area. The Old River MWC well was constructed in 1962 and has a ten-inch diameter steel casing perforated from 189 to 291 feet bgs. Water delivered by the Old River MWC system contains uranium levels that exceed the MCL of 30 µg/L established by State and federal regulations. Water from this well also exceeds the 1, 2, 3-TCP MCL of 0.005 µg/L. The Old Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 87 River MWC well lacks source reliability and storage capacity to serve the customers. The MWC also lacks technical, managerial, and financial capacity.

South Kern MWC provides water to 32 residents via 15 service connections in its 9.7-acre service area.

Water is provided by a single well in the northeast corner of the service area. The South Kern MWC well was constructed in 1959 and has a ten-inch diameter steel casing perforated from 230 to 337 feet bgs.

The well currently produces water that exceeds the uranium MCL of 30 µg/L. Water from this well also exceeds the 1, 2, 3-TCP MCL of 0.005 µg/L. The South Kern Old River MWC well also lacks source reliability and storage capacity to serve the customers. The MWC also lacks technical, managerial, and financial capacity.

Wastewater or Stormwater
Sewage disposal is handled by both public and private agencies and by private individual systems.

Disposal of waste by public agencies is through County Service Areas, Community Services Districts and Public Utility Districts. Individual private disposal generally occurs through a septic tank and leach line or cesspool system (County 2004).

The County also typically requires developing sites to provide for their own on-site retention or show that existing facilities have sufficient capacity to carry the additional runoff (County 2004).

Electrical and Natural Gas
The project site is serviced by PG&E for electricity and is serviced by Southern California Gas for gas.

Impact Analysis
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Less Than Significant Impact with Mitigation Incorporated. The proposed project would install approximately 6,000linear feet of a new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines, and 29 household connections. Three fire hydrants would also be installed, and two wells would be abandoned as part of the proposed project. The proposed project would not require or result in the relocation or construction of new or expanded wastewater treatment or storm water drainage, electric power, natural gas, or telecommunication facilities. However, the project does consist of the construction of new water facilities. The potential environmental effects of the proposed water main pipelines were evaluated in this Initial Study, and it was found that there would be potential impacts related to biological resources, cultural resources, geology and soils, hazards, tribal cultural resources which would be mitigated to a less than significant level with the implementation of mitigation measures BIO-1, CUL-1, CUL-2, GEO-1, and HAZ-1. No expansion of water facilities would be required beyond what has been evaluated in this Initial Study. Therefore, the impact would be less than significant with mitigation incorporated.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 88 b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
Less Than Significant Impact. The proposed project would install approximately 6,000 linear feet of a new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines, and 29 household connections.

Three fire hydrants would also be installed, and two wells would be abandoned as part of the proposed project. Based on water supply information provided by the City and predicted MWC demands, the City has sufficient capacity to service the MWCs. Therefore, sufficient water supplies would be available to serve the proposed project during normal, dry, and multiple dry years. The impact would be less than significant.
c) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
No Impact. The proposed project would install approximately 6,000 linear feet of a new 10-inch water main, 1,600 linear feet of 8-inch lateral pipelines, and 29 household connections. Three fire hydrants would also be installed, and two wells would be abandoned as part of the proposed project. The project site is not served by a wastewater treatment provider and the proposed project would not generate wastewater that requires treatment. Therefore, no impact would occur. d) Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
Less Than Significant Impact. The proposed project would not create substantial amounts of solid waste, and as such would not exceed the capacity of local infrastructure. Minimal waste would be generated during construction and would likely be disposed of at the Bena Landfill. The Bena Landfill is permitted through 2046 and can receive 4,500 tons/day (CalRecycle 2024). Additionally, the proposed project would comply with federal, State, and local management and reduction statues and regulations related to solid waste. Therefore, the impact would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 89 XX. WILDFIRE
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project:
a) Substantially impair an adopted emergency response plan or emergency evacuation plan? ☐ ☒ ☐ ☐
b) Due to slope, prevailing winds, and other factors,
exacerbate wildfire risks, and thereby expose project
occupants to, pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
☐ ☐ ☒ ☐
c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency
water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
☐ ☐ ☒ ☐
d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a
result of runoff, post-fire slope instability, or drainage changes?
☐ ☐ ☒ ☐
Environmental Setting
To extend service from the City of Bakersfield’s water system to the areas currently served by Old River MWC and South Kern MWC, the proposed project would construct approximately 6,000 linear feet of new 10-inch water main and 1,600 linear feet of 8-inch lateral pipelines. The water service area of the proposed project is the unincorporated community of Old River, located at the southeast corner of the intersection of Old River Road and SR-119. The community is surrounded by agricultural land uses to the west, south, and east, with some commercial land uses to the north along SR-119. According to California Department Forestry and Fire Protection (CAL FIRE) Fire Hazard Severity Zone Map, the project site is located within a Local Responsibility Area (LRA; CAL FIRE 2024). The project site is not located on or near the Fire Hazard Severity Zone (FHSZ; CAL FIRE 2024). The nearest fire department to the project site is the Kern County Fire Station 53, located within the community of Old River.

Impact Analysis
a) Substantially impair an adopted emergency response plan or emergency evacuation plan? Less Than Significant Impact with Mitigation Incorporated. Operation of the proposed project would occur passively underground and would not have the potential to interfere with emergency response or evacuation. Construction of the proposed project may temporarily interfere with roadway traffic, which may have the potential to affect emergency response or evacuation plans. Adherence to conditions of Mitigation Measure HAZ-1, which would require the preparation and adoption of a traffic demand Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 90 management plan, would ensure the proposed project would not interfere with emergency response or evacuation plans. Therefore, impacts would be less than significant with mitigation incorporated. b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
Less Than Significant Impact. As described above, the proposed project site is not located in a FHSZ or CAL FIRE State Responsibility Area. Operation of the proposed project would not result in an exacerbation of wildfire risk as it would operate passively underground. Construction of the proposed project would take place along the existing shoulders of Old River Road and SR-119, which are generally barren and pose a minimal risk of wildfire. Therefore, impacts would be less than significant. c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? Less Than Significant Impact. The proposed project would include the installation of water infrastructure that would operate passively underground and would not require maintenance that would exacerbate fire risk. Temporary and ongoing impacts to the environment related that would occur as a result of this infrastructure installation are analyzed throughout this Initial Study. Impacts would be less than significant.
d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? Less Than Significant Impact. The proposed project would not create habitable or aboveground structures that could be exposed to significant wildfire risks and would not alter drainage patterns on the project site. The project site is generally flat and the proposed project is not anticipated to result in risks to nearby people or structures, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes. Impacts would be less than significant.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 91 XXI. MANDATORY FINDINGS OF SIGNIFICANCE
Potentially
Significant
Impact
Less Than
Significant
with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a) Does the project have the potential to substantially degrade the quality of the environment, substantially
reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community,
substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate
important examples of the major periods of California
history or prehistory?
☐ ☒ ☐ ☐
b) Does the project have impacts that are individually
limited, but cumulatively considerable? (“Cumulatively
considerable” means that the incremental effects of a
project are significant when viewed in connection with
the effects of past projects, the effects of other current projects, and the effects of past, present and probable future projects)?
☐ ☒ ☐ ☐
c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
☐ ☒ ☐ ☐
a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Less Than Significant with Mitigation Incorporated. The proposed project has the potential to result in impacts to Swainson’s hawk; however, implementation of Mitigation Measure BIO-1 would reduce these impacts to a less than significant level. No special status plant species would be impacted by project implementation. The proposed project also has the potential to impact cultural and tribal cultural resources during construction. Implementation of Mitigation Measures CUL-1 and CUL-2 would ensure these impacts are reduced to a less than significant level. Therefore, the proposed project would not substantially degrade the environment, decrease the number or habitat of special status plant or animal species, or eliminate major periods of California history. Impacts would be less than significant with mitigation incorporated.
b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are significant when Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 92 viewed in connection with the effects of past projects, the effects of other current projects, and the effects of past, present and probable future projects)? Less Than Significant with Mitigation Incorporated. CEQA Guidelines Section 15130 requires a discussion of the cumulative impacts of a project when the project’s incremental effect is “cumulatively considerable,” meaning that the project’s incremental effects are considerable when viewed in connection with the effects of past, current, and probable future projects.

The majority of the potential impacts related to the proposed project could occur during construction.

However, all impacts related to construction are temporary and short-term and would not cause a significant impact, as detailed in this Initial Study. Key areas of concern addressed in this Initial Study include biological resources, cultural resources, geology and soils, hydrology and water quality, hazards and hazardous materials, tribal cultural resources, and utilities and service systems. However, impacts relating to these key areas of concern would be mitigated to a less than significant level. Therefore, the proposed project would not have a cumulatively considerable impact, and no additional mitigation is required.
c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
Less Than Significant with Mitigation Incorporated. The proposed project would not include any construction activities or operational components that would negatively affect any persons in the vicinity. In addition, all resource topics have been analyzed in accordance with the State CEQA Guidelines or associated thresholds and found to pose no impact, a less than significant impact, or a less than significant impact with mitigation incorporated. As discussed in Section 4.III, Air Quality, no violations of air quality thresholds would occur and no significant impacts to sensitive receptors related to pollutants would occur. As discussed in Section 4.IX, Hazards and Hazardous Materials, of this Initial Study, there are no concerns from past activities at the project site and no hazardous materials and/or wastes would be generated by the proposed project. As detailed in Section 4.XIII, Noise, the proposed project would not generate excessive noise that would conflict with local noise ordinances and cause disturbances to local residents. During construction, temporarily altered traffic conditions may occur; however, implementation of a TMP as described in mitigation measure HAZ-1 would ensure emergency access and evacuation routes are maintained. Consequently, the proposed project would not result in any environmental effects that would cause substantial adverse effects on human beings directly or indirectly.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 93 5.0 REFERENCES
Amtrak. 2024. California Train Routes. San Joaquins. Available at: https://www.amtrak.com/californiatrain-routes. Accessed July 12, 2024.

Bakersfield, City of (City). 2024a. The City of Bakersfield's Draft Climate Action Plan is now available for public review. Available at: https://www.bakersfieldcity.us/1088/Climate-Action-Plan-CAP.

Accessed July 15, 2024.
2024b. The City of Bakersfield Land Use and Planning Viewer. GIS Map. Available at:
https://bakersfielddatalibrarycob.opendata.arcgis.com/apps/9fbb25e825e3425a84e7dea631e42f7b/explore. Accessed July 17, 2024.
2024c. The City of Bakersfield Recreation and Parks Department. Available at:
https://www.bakersfieldcity.us/297/Recreation-Parks. Accessed July 17, 2024. 1994. Metropolitan Bakersfield Habitat Conservation Plan. Available at:
https://docs.bakersfieldcity.us/weblink/0/edoc/625001/Metropolitan%20Bakersfield%20Habita t%20Conservation%20Plan.pdf
California Air Pollution Control Officers Association (CAPCOA). 2022. User’s Guide for CalEEMod Version 2022.1. Available at: http://www.caleemod.com/.

California Air Resources Board (CARB). 2024. Overview: Diesel Exhaust and Health. Available at:
https://ww2.arb.ca.gov/resources/overview-diesel-exhaust-and-health. 2022. Scoping Plan for Achieving Carbon Neutrality. Accessed July 9, 2024 and available at:
https://ww2.arb.ca.gov/our-work/programs/ab-32-climate-change-scoping-plan/2022-scopingplan-documents. 2005. Air Quality and Land Use Handbook: A Community Health Perspective. Available at:
https://www.aqmd.gov/docs/default-source/ceqa/handbook/california-air-resources-board-airquality-and-land-use-handbook-a-community-health-perspective.pdf.

California Department of Conservation (DOC). 2024a. California Important Farmland Finder. Available at:
https://maps.conservation.ca.gov/DLRP/CIFF/. Accessed July 19, 2024. 2024b. Earthquake Zones of Required Investigation. Available at:
https://maps.conservation.ca.gov/cgs/EQZApp/app/. Accessed May 30, 2024 2024c. Fault Activity Map of California. Available at: https://maps.conservation.ca.gov/cgs/fam/.

Accessed May 30, 2024.

California Department of Forestry and Fire Protection (CAL FIRE). 2024. Fire Hazard Severity Zone Map.

Available at: https://calfireforestry.maps.arcgis.com/apps/webappviewer/index.html?id=988d431a42b242b29d89597ab69 3d008. Accessed June 20, 2024.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 94 California Department of Fish and Wildlife (CDFW). 2024. California Natural Diversity Database (CNDDB) RareFind 5. July 16, 2024.

California Department of Resources Recycling and Recovery (CalRecycle). 2024. SWIS Facility/ Site Activity Details. Available at:
https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/3931?siteID=742. Accessed July 15, 2024.

California Department of Toxic Substances Control (DTSC). 2024. Envirostor. Available at:
https://www.envirostor.dtsc.ca.gov/public/. Accessed June 20, 2024.

California Department of Transportation (Caltrans). 2024. Scenic Highways. Available at:
https://dot.ca.gov/programs/design/lap-landscape-architecture-and-community-livability/lapliv-i-scenic-highways. Accessed June 3, 2024.

California Energy Commission (CEC). 2021a. 2020 Total System Electric Generation. Available at:
https://www.energy.ca.gov/data-reports/energy-almanac/california-electricity-data/2019-totalsystem-electric-generation. 2021b. Supply and Demand of Natural Gas in California. Available at:
https://www.energy.ca.gov/data-reports/energy-almanac/californias-natural-gasmarket/supply-and-demand-natural-gas-california. 2021c. California Gasoline Data, Facts, and Statistics. Available at:
https://www.energy.ca.gov/data-reports/energy-almanac/transportation-energy/californiagasoline-data-facts-and-statistics. 2021d. Diesel Fuel Data, Facts, and Statistics. Available at: https://www.energy.ca.gov/datareports/energy-almanac/transportation-energy/diesel-fuel-data-facts-and-statistics.

California Native Plant Society (CNPS). 2024. Inventory of Rare and Endangered Plants (online edition, v8-03 0.39). Website http://www.rareplants.cnps.org. Dated July 16, 2024.

Central Valley Regional Water Quality Control Board (CVRWQCB). 2018. Water Quality Control Plan for the Tulare Lake Basin Third Edition. Available at:
https://www.waterboards.ca.gov/centralvalley/water_issues/basin_plans/tularelakebp_201805 .pdf. Accessed July 2, 2024.

Federal Emergency Management Agency (FEMA). 2024. FEMA’s National Flood Hazard Layer (NFHL) Viewer. Available at: https://hazardsfema.maps.arcgis.com/apps/webappviewer/index.html?id=8b0adb51996444d4879338b5529aa 9cd. Accessed July 10, 2024.

Federal Transit Administration (FTA). 2018. Transit Noise and Vibration Impact Assessment Manual.

Available at: https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/researchinnovation/118131/transit-noise-and-vibration-impact-assessment-manual-fta-report-no0123_0.pdf.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 95 Governor’s Office of Planning and Research (OPR). 2013. Transportation Impacts (SB 743). Available at:

CEQA: Transportation Impacts (SB 743) - Office of Planning and Research (ca.gov). Accessed July 17, 2024.

Intergovernmental Panel on Climate Change (IPCC). Intergovernmental Panel on Climate Change (IPCC). 2007. Climate Change 2007: The Physical Science Basis. Summary for Policymakers. Contribution of Working Group I to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change. February. Available at: https://www.ipcc.ch/report/ar4/wg1/.

Kern County (County). 2024a. Kern County Subbasin of the San Joaquin Valley Groundwater Basin Groundwater Sustainability Plan. Available at: http://www.kernrivergsa.org/?page_id=966#.

Accessed July 2, 2024.
2024b. Kern County Interactive GIS Map. Available at:
https://maps.kerncounty.com/H5/index.html?viewer=KCPublic. Accessed July 17, 2024 2024c. Kern County Gateway. Interactive Data Map. Available at: Maps | Kern County Gateway (databasin.org). Accessed July 17, 2024.
2024d. Kern County 2024-2031 Housing Element Draft. Volume I Revised. Available at:
https://psbweb.kerncounty.com/planning/pdfs/he/KCHE_2024-2031_vol1_redline_draft.pdf Accessed July 6, 2024
2024e. Kern County Fire Department. Department Profile. Available at: About KCFD – Kern County Fire Department. Accessed July 17, 2024.
2024f. Kern County Sheriff’s Department. Substations. Available at: Substations | KCSO (kernsheriff.org). Accessed July 17, 2024.
2024g. Kern County Board of Education. Interactive District Map. Available at: Kern County Board of Ed 2021/2022 Redistricting (arcgis.com). Accessed July 17, 2024. 2024h. Kern County Parks and Recreation. Available at:
https://www.visitbakersfield.com/directory/kern-county-parks-andrecreation/#:~:text=The%20Kern%20County%20Parks%20and,and%20landscapes%2076%20cou nty%20buildings. Accessed July 17, 2024.
2024i. Kern Transit. Routes & Schedules. Available at: https://kerntransit.org/routes-andschedules/. Accessed July 12, 2024. 2024j. Kern County Public Works – Transportation Division. “Walk Kern” Project. Interactive GIS Map. Available at: WALK KERN - A Kern County Public Works Project (arcgis.com). Accessed July 17, 2024.
2022. Kern County Regional Transportation Plan/Sustainable Communities Strategy. Available at: https://www.kerncog.org/wp-content/uploads/2022/12/2022_RTP.pdf. Accessed July 6, 2024.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 96 Kern County (County) (cont.)
2012. Airport Land Use Compatibility Plan. November 13. Available at:
https://content.civicplus.com/api/assets/80f886a4-6789-4248-a3cb-1e267dd7c634. Accessed July 6, 2024.
2010. Kern County. Parks and Recreation Master Plan. Available at:
https://www.kerncounty.com/home/showpublisheddocument/2148/637127126894370000.

Accessed July 18, 2024.
2009. Kern County Land Use, Open Space, and Conservation Element. Available at:
https://psbweb.kerncounty.com/planning/pdfs/kcgp/KCGPChp1LandUse.pdf. Accessed June 26, 2024.
2004. Revised Update of the Kern County General Plan. Volume I Recirculated Draft Program Environmental Impact Report. Available at:
https://psbweb.kerncounty.com/planning/pdfs/kcgp/KCGP_RPEIR_vol1.pdf. Accessed May 30, 2024
Mayer, K.E. and W.F. Laudenslayer. 1988. A Guide to Wildlife Habitats of California. State of California, Resources Agency, Department of Fish and Game, Sacramento, CA 166pp.

National Resources Conservation Service (NRCS). 2024. Web Soil Survey. Available at:
https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx. Accessed May 31, 2024 NETR Online. 2024. Aerial Imagery 1947-2020. Accessed July 2024 at https://www.historicaerials.com/viewer.

Office of Environmental Health Hazard Assessment (OEHHA). 2015. Air Toxics Hot Spots Program Guidance Manual for Preparation of Health Risk Assessments. Available at:
https://oehha.ca.gov/air/crnr/notice-adoption-air-toxics-hot-spots-program-guidance-manualpreparation-health-risk-0.

San Joaquin Valley Air Pollution Control District (SJVAPCD). 2024a. Ambient Air Quality Standards & Valley Attainment Status. Available at: https://www.valleyair.org/aqinfo/attainment.htm. 2024b. Ozone Contingency State Implementation Plan Revision for the 2008 and 2015 8-Hour Ozone Standards. Available at: https://ww2.valleyair.org/media/ovgo2gku/2_-ozonecontingency-sip-update_final-adopted.pdf 2024c. 2024 Plan for the 2012 Annual PM2.5 Standard. Available at:
https://ww2.valleyair.org/media/gw5bacvj/2024-pm25-plan.pdf 2024d. Current District Rules and Regulations. Available at: https://ww2.valleyair.org/rules-andplanning/current-district-rules-and-regulations/.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 97 San Joaquin Valley Air Pollution Control District (SJVAPCD) (cont.) 2023. 2023 Maintenance Plan and Redesignation Request for the Revoked 1-hour Ozone Standard. Available at: https://ww2.valleyair.org/media/itoegkch/03-adopted-2023- maintenance-plan-and-redesignation-request-for-the-revoked-1-hour-ozone-standard.pdf 2022. 2022 Plan for the 2015 8-Hour Ozone Standard. Available at:
https://ww2.valleyair.org/rules-and-planning/air-quality-plans/ozone-plans/2022-ozone-planfor-the-san-joaquin-valley/ 2018. 2018 Plan for 1997, 2006, and 2012 PM2.5 Standards. Available at:
http://www.valleyair.org/pmplans/documents/2018/pm-plan-adopted/2018-Plan-for-the-1997- 2006-and-2012-PM2.5-Standards.pdf.
2016a. 2016 Ozone Plane. June 16. Available at: http://valleyair.org/Air_Quality_Plans/OzonePlan-2016/Adopted-Plan.pdf. 2016b. 2016 Moderate Area Plan for the 2012 PM2.5 Standard. September 15. Available at:
http://www.valleyair.org/Air_Quality_Plans/docs/PM25-2016/2016-Plan.pdf. 2015. Guidance for Assessing and Mitigating Air Quality Impacts. Available at:
https://www.valleyair.org/transportation/GAMAQI-2015/FINAL-DRAFT-GAMAQI.PDF. 2009a. Guidance for Valley Land-use Agencies in Addressing GHG Emission Impacts for New Projects under CEQA. Available at: https://www.valleyair.org/Programs/CCAP/12-17- 09/3%20CCAP%20-%20FINAL%20LU%20Guidance%20-%20Dec%2017%202009.pdf. 2009b. District Policy: Addressing GHG Emission Impacts for Stationary Source Projects Under CEQA When Serving as the Lead Agency. Available at:
https://www.valleyair.org/Programs/CCAP/12-17-09/2%20CCAP%20- %20FINAL%20District%20Policy%20CEQA%20GHG%20-%20Dec%2017%202009.pdf.

Sacramento Metropolitan Air Quality Management District (SMAQMD). 2021. CEQA Guide Chapter 6:

Greenhouse Gas Emissions. Revised February. Available at:
https://www.airquality.org/LandUseTransportation/Documents/Ch6GHG2-26-2021.pdf.

State Water Resources Control Board. 2024. Geotracker. Available at:
https://geotracker.waterboards.ca.gov/map/. Accessed June 20, 2024.

U.S. Census Bureau. 2024. QuickFacts, Bakersfield city, California. Available at:
https://www.census.gov/quickfacts/fact/table/bakersfieldcitycalifornia/PST045223#PST045223.

Accessed June 3, 2024.

U.S. Department of Transportation (USDOT). 2008. Roadway Construction Noise Model Version 1.1.

Available at: https://www.fhwa.dot.gov/environment/noise/construction_noise/rcnm/.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 98 U.S. Environmental Protection Agency (USEPA). 2024. Superfund National Priorities List. Available at:
https://www.arcgis.com/apps/webappviewer/index.html?id=33cebcdfdd1b4c3a8b51d416956c 41f1. Accessed June 20, 2024
2016. Determination of Attainment of the 1-Hour Ozone National Ambient Air Quality Standard in the San Joaquin Valley Nonattainment Area in California. July. Available at:
https://www.federalregister.gov/documents/2016/07/18/2016-16792/determination-ofattainment-of-the-1-hour-ozone-national-ambient-air-quality-standard-in-the-san.

U.S. Fish and Wildlife Service (USFWS). 2024. Information for Planning and Consultation (IPaC) Trust Resource Report. Generated January 12, 2024 at https://ecos.fws.gov/ipac/.

Western Regional Climate Center (WRCC). 2019. 1937-2016 Monthly Climate Summary, Bakersfield Airport, California (040442). Accessed July 15, 2024 and available at: https://wrcc.dri.edu/cgibin/cliMAIN.pl?ca0442.

Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System 99 6.0 PREPARERS
City of Bakersfield
Kristina Budak, Water Director
Paul Johnson, Planning Director
Matthew Collom, Deputy City Attorney
Solomon Sackett, Water Planner
Carollo Engineers
Sri Varadaraj, Project Manager/Associate Vice President HELIX Environmental Planning, Inc.

Erin Gustafson, AICP, Project Manager
Lesley Owning, Principal Planner
Martin Rolph, Noise Specialist
Julia Pano, Environmental Planner
Anviti Singh, Environmental Planner
Emmaline deBecker, Environmental Planner
Appendix A
Air Quality and Greenhouse Gas
Emissions Letter Report
HELIX Environmental Planning, Inc.
1180 Iron Point Road, Suite 130
Folsom, CA 95630
916.435.1205 tel
619.462.0552 fax
www.helixepi.com
July 22, 2024 02632.00014.001
Sri Varadaraj, P.E.

Carollo Engineers
1401 Fulton Street, Suite 802
Fresno, CA 93721
Subject: Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System Project Air Quality And Greenhouse Gas Emissions Analysis Dear Mr. Varadaraj:

HELIX Environmental Planning, Inc. (HELIX) has assessed the air quality and greenhouse gas (GHG) emissions impacts associated with the construction and operation of the proposed Consolidation of South Kern and Old River Municipal Water Companies into Bakersfield Water System Project (project) located in Kern County (County), southwest of the City of Bakersfield. Analysis within this report was prepared to support impact analysis pursuant to the California Environmental Quality Act (CEQA; Public Resources Code Sections 21000 et seq.), CEQA Guidelines (Title 14, Section 15000 et seq. of the California Code of Regulations).

PROJECT LOCATION
The project is located in Kern County (County) southwest of the City of Bakersfield (City). Old River Mutual Water Company (MWC) currently serves an approximately 10.7-acre area at the southeast corner of Old River Road and State Route (SR) -119. South Kern MWC serves an approximately 9.7-acre area east of Old River Road and immediately south of the Old River MWC service area. Both service areas are located in unincorporated Kern County, just outside of City limits. See Figure 1 for a regional location map and see Figure 2 for the Mutual Water Company site locations (Note: All Figures are located in Attachment A).

PROJECT BACKGROUND
Old River MWC and South Kern MWC currently provide water service to residential and commercial customers in the project area. Each MWC operates using a single well, located within their respective service areas, which provides water to adjacent parcels and nearby customers. Old River MWC provides water to 46 residents via 14 connections in its 10.7-acre service area. Water is provided by a single well, located within the service area. The Old River MWC well was constructed in 1962 and has a 10-inch diameter steel casing perforated from 189 to 291 feet below ground surface (bgs). Water delivered HELIX
Environmental Planning
Letter to Sri Varadaraj Page 2 of 21
July 22, 2024
by the Old River MWC system contains uranium levels that exceed the maximum contaminant level (MCL) of 30 micrograms per liter (µg/L) established by state and federal regulations. Water from this well also exceeds the 1, 2, 3-trichloropropane (TCP) MCL of 0.005 µg/L. The Old River MWC well lacks source reliability and storage capacity to serve the customers. The MWC also lacks technical, managerial, and financial capacity.

South Kern MWC provides water to 32 residents via 15 service connections in its 9.7-acre service area.

Water is provided by a single well in the northeast corner of the service area. The South Kern MWC well was constructed in 1959 and has a ten-inch diameter steel casing perforated from 230 to 337 feet bgs.

The well currently produces water that exceeds the uranium MCL of 30 µg/L. Water from this well also exceeds the 1, 2, 3-TCP MCL of 0.005 µg/L. The South Kern MWC well also lacks source reliability and storage capacity to serve the customers. The MWC also lacks technical, managerial, and financial capacity.

The proposed project would abandon the Old River MWC well and the South Kern MWC well and extend the City of Bakersfield’s water system to serve the areas previously served by these two MWCs, thereby consolidating both MWCs into the City of Bakersfield’s water system. Based on water supply information provided by the City and predicted MWC demands, the City has sufficient capacity to service the MWCs.

As the MWCs would be consolidated into the City’s water system, the City of Bakersfield would be the Lead Agency, even though the project site is located just outside the City limits.

PROJECT DESCRIPTION
Old River MWC and South Kern MWC provide water service to residential and commercial customers.

Each MWC operates using a single well, and both wells produce water that exceeds allowable levels of uranium and 1, 2, 3-TCP. Therefore, the proposed project would abandon the two wells and extend the City of Bakersfield’s water system to consolidate both MWCs into the City of Bakersfield’s water system.

In order to extend service from the City of Bakersfield’s water system to the areas currently served by Old River MWC and South Kern MWC, the project would construct approximately 6,000 linear feet of new 10-inch water main, and 1,600 linear feet of 8-inch lateral pipelines with connections to 29 households. Three fire hydrants would also be installed for use in case of emergency. The point of connection to the City of Bakersfield’s water system would be the existing 16-inch diameter water main at McCutchen Road and Old River Road. See Figure 3 for the site plan (Attachment A). Once the connection to the City of Bakersfield water system is complete, the Old River MWC and the South Kern MWC wells would be abandoned and no longer provide water to the community.

AIR QUALITY/GREENHOUSE GAS EMISSIONS ANALYSIS
The proposed project is located in unincorporated Kern County, which lies within the San Joaquin Valley Air Basin (SJVAB). Air quality in the SJVAB is regulated by the U.S. Environmental Protection Agency (USEPA) at the federal level, by the California Air Resources Board (CARB) at the state level, and by the San Joaquin Valley Air Pollution Control District (SJVAPCD) at the regional level.

The SJVAB comprises all or part of eight counties: San Joaquin, Stanislaus, Fresno, Merced, Madera, Kings, Tulare, and Kern. The distinctive climate of the SJVAB is determined by its terrain and geographic location. The SJVAB is the southern half California’s Central Valley and is 250 miles long and averages 35 miles wide. The SJVAB is bounded by the Sierra Nevada Mountains to the east, the Coast Ranges -----------
HELIX Environmental Planning
Letter to Sri Varadaraj Page 3 of 21
July 22, 2024
to the west, the Tehachapi Mountains to the south, and is open to the Sacramento Valley and San Francisco Bay Area to the north.

The SJVAB is in a Mediterranean climate zone which is characterized by typically hot and dry summers and sparse rainfall mainly during the winter. Especially in summer, winds in the SJVAB most frequently blow from the northwesterly direction. The region’s topographic features restrict air movement and channel the air mass towards the southeastern end of the basin. A secondary but significant summer wind pattern is from the southeasterly direction and can be associated with nighttime drainage winds from the Sierra Nevada Mountains, and prefrontal conditions. Many days in the winter are marked by stagnation events where winds are very weak. Transport of pollutants during winter can be very limited.

The vertical dispersion of air pollutants in the SJVAB can be limited by persistent temperature inversions. Temperature inversions that occur on the summer days are usually encountered 2,000 to 2,500 feet above the valley floor. In winter months, overnight inversions occur 500 to 1,500 feet above the valley floor. The mountains surrounding the basin are mostly above the typical summer height of inversion layers, restricting dispersion of pollutants (SJVAPCD 2015).

Solar radiation and temperature are particularly important in the chemistry of ozone formation. The SJVAB averages over 260 sunny days per year. Generally, the higher the temperature, the more ozone formed, since reaction rates increase with temperature. The 1937 through 2016 annual average maximum daily temperature as measured at the Bakersfield Airport climatic station, approximately 7 miles northeast of the project site, is 77.8 degrees Fahrenheit (°F). The highest monthly average maximum daily temperature (98.6°F) occurs in July, and the lowest monthly average minimum daily temperature (38.5°F) occurs in December and January. The average annual precipitation is approximately 6.2 inches (Western Regional Climate Center 2016).

REGULATORY SETTING
Air Quality
Criteria Pollutants
Criteria pollutants are defined and regulated by State and federal law as a risk to the health and welfare of the public and are categorized into primary and secondary pollutants. Primary air pollutants are those that are emitted directly from sources, including carbon monoxide (CO); reactive organic gases ([ROGs] also known as volatile organic compounds [VOCs]); 1 nitrogen oxides (NOX); sulfur dioxide (SO2); coarse particulate matter (PM10); fine particulate matter (PM2.5); and lead. Of these primary pollutants, CO, SO2, PM10, PM2.5, and lead are criteria pollutants. ROGs and NOX are criteria pollutant precursors and go on to form secondary criteria pollutants through chemical and photochemical reactions in the atmosphere.

The principal secondary criteria pollutants are ozone and nitrogen dioxide (NO2). In addition to being primary pollutants, PM10 and PM2.5 can be secondary pollutants formed by chemical reactions in the atmosphere.
1 CARB defines and uses the term ROGs while the USEPA defines and uses the term VOCs. The compounds included in the lists of ROGs and VOCs and the methods of calculation are slightly different. However, for the purposes of estimating criteria pollutant precursor emissions, the two terms are often used interchangeably.

HELIX
Environmental Planning
Letter to Sri Varadaraj Page 4 of 21
July 22, 2024
Ambient air quality is described in terms of compliance with State and national standards, and the levels of air pollutant concentrations considered safe, to protect the public health and welfare. These standards are designed to protect people most sensitive to respiratory distress, such as asthmatics, the elderly, very young children, people already weakened by other disease or illness, and people engaged in strenuous work or exercise. The USEPA has established national ambient air quality standards (NAAQS) for criteria pollutants. As permitted by the Clean Air Act (CAA), California has adopted the more stringent California ambient air quality standards (CAAQS) and expanded the number of regulated air pollutant constituents.

CARB is required to designate areas of the State as attainment, nonattainment, or unclassified for any State standard. An “attainment” designation for an area signifies that pollutant concentrations do not violate the standard for that pollutant in that area. A “nonattainment” designation indicates that a pollutant concentration violated the standard at least once.

The project site is located in unincorporated Kern County that lies within the SJVAB and, as such, is in an area designated as “nonattainment” for certain pollutants that are regulated under the CAA. Table 1, San Joaquin Valley Air Basin – Attainment Status, lists the federal and State attainment status of the SJVAB (including Kern County and the project site) for the NAAQS and CAAQS. As shown in Table 1, the SJVAB is designated as attainment for PM10; attainment/unclassified for CO, NO2, SO2; extreme nonattainment for 8-hour ozone; and nonattainment for PM2.5 with respect to the NAAQS. The SJVAB is designated as attainment for CO, NO2, SO2, and lead; severe nonattainment for 1-hour ozone; and as nonattainment for 8-hour ozone, PM2.5, and PM10 with respect to the CAAQS (SJVAPCD 2024a).

Table 1
SAN JOAQUIN VALLEY AIR BASIN – ATTAINMENT STATUS
Pollutant Federal Standards State Standards
Ozone – One hour No Federal Standard Nonattainment/Severe Ozone – Eight hour Nonattainment/Extreme Nonattainment
PM10 Attainment Nonattainment
PM2.5 Nonattainment Nonattainment
CO Attainment/Unclassified Attainment/Unclassified
NO2 Attainment/Unclassified Attainment
SO2 Attainment/Unclassified Attainment
Lead (Particulate) No Designation/Unclassified Attainment Hydrogen Sulfide No Federal Standard Unclassified
Sulfates No Federal Standard Attainment
Visibility Reducing Particles No Federal Standard Unclassified Vinyl Chloride No Federal Standard Attainment
Source: SJVAPCD 2024a
Toxic Air Contaminants
The Health and Safety Code (§39655, subd. (a).) defines a toxic air contaminant (TAC) as “an air pollutant which may cause or contribute to an increase in mortality or in serious illness, or which may pose a present or potential hazard to human health.” A substance that is listed as a hazardous air pollutant pursuant to subsection (b) of Section 112 of the Federal CAA (42 United States Code Section 7412[b]) is a TAC.

I I
HELIX
Environmental Planning
Letter to Sri Varadaraj Page 5 of 21
July 22, 2024
Under State law, the California Environmental Protection Agency (CalEPA), acting through CARB, is authorized to identify a substance as a TAC if it determines the substance is an air pollutant that may cause or contribute to an increase in mortality or an increase in serious illness, or that may pose a present or potential hazard to human health.

Diesel engines emit a complex mixture of air pollutants, including both gaseous and solid material. The solid material in diesel exhaust is referred to as diesel particulate matter (DPM). Almost all DPM is 10 microns or less in diameter, and 90 percent of DPM is less than 2.5 microns in diameter (CARB 2024).

Because of their extremely small size, these particles can be inhaled and eventually trapped in the bronchial and alveolar regions of the lung. In 1998, CARB identified DPM as a TAC based on published evidence of a relationship between diesel exhaust exposure and lung cancer and other adverse health effects. DPM has a notable effect on California’s population—it is estimated that about 70 percent of total known cancer risk related to air toxins in California is attributable to DPM (CARB 2024).

San Joaquin Valley Air Pollution Control District
The proposed project is located in unincorporated Kern County, which lies within the SJVAB. Air quality in the SJVAB is regulated by the USEPA at the federal level, by the CARB at the state level, and by SJVAPCD at the regional level. As a regional agency, the SJVAPCD works directly with local governments and cooperates actively with all federal and State government agencies. The SJVAPCD develops rules and regulations; establishes permitting requirements for stationary sources; inspects emissions sources; and enforces such measures through educational programs or fines, when necessary.

Air Quality Plans
The SJVAPCD has developed plans to attain State and federal standards for ozone and particulate matter. The SJVAPCD’s air quality plans include emissions inventories to measure the sources of air pollutants, to evaluate how well different control methods have worked, and to show how air pollution will be reduced. The plans also use computer modeling to estimate future levels of pollution and make sure that the San Joaquin Valley will meet air quality goals. 1-Hour Ozone Plan – Although the USEPA revoked its 1979 1-hour ozone standard in June 2005, many planning requirements remain in place, and the SJVAB must still attain this standard before it can rescind CAA Section 185 fees. The SJVAPCD’s 2013 Plan for the Revoked 1-hour Ozone Standard demonstrated attainment of the 1-hour ozone standard by 2017 (SJVAPCD 2015). On July 18, 2016, the USEPA published in the Federal Register the final action to determine that the SJVAB has attained the 1-hour ozone standard (USEPA 2016).On June 15, 2023, the SJVAPCD adopted the 2023 Maintenance Plan and Redesignation Request for the Revoked 1-hour Ozone Standard that includes provisions for a maintenance plan and requirements for meeting all five criteria of Section 107(d)(3)(E) of the CAA (SJVAPCD 2023).
8-Hour Ozone Plan – The SJVAPCD’s 2007 Ozone Plan demonstrates attainment of the 1997 NAAQS 8-hour ozone standard by 2023. The USEPA approved the 2007 Ozone Plan effective April 30, 2012. (SJVAPCD 2015). In June 2016, the SJVAPCD adopted the 2016 Plan for the 2008 8-Hour Ozone Standard to map strategies for attainment of the updated NAAQS 8-hour ozone standard (SJVAPCD 2016a). The SJVAPCD adopted the 2022 Plan for the 2015 8-Hour Ozone Standard in December 2022. This Plan satisfies Clean Air Act requirements and ensures expeditious attainment of the 70 parts per billion HELIX
Environmental Planning
Letter to Sri Varadaraj Page 6 of 21
July 22, 2024
8-hour ozone standard (SJVAPCD 2022). On April 24, 2024, the SJVAPCD adopted the Ozone Contingency State Implementation Plan Revision for the 2008 and 2015 8-Hour Ozone Standards to address the contingency provisions for the 2008 and 2015 8-hour ozone standards (SJVAPCD 2024b).

PM10 Plan – Based on PM10 measurements from 2003-2006, USEPA found that the SJVAB has reached Federal PM10 standards. On September 21, 2007, the SJVAPCD adopted the 2007 PM10 Maintenance Plan and Request for Redesignation. On September 25, 2008, the SJVAB was redesignated to attainment/maintenance (SJVAPCD 2015).

PM2.5 Plan – The SJVAPCD’s 2008 PM2.5 Plan demonstrated 2014 attainment of USEPA’s first PM2.5 standard, set in 1997. The USEPA lowered the PM2.5 standard in 2006, and the SJVAPCD’s 2012 PM2.5 Plan showed attainment of this standard by 2019, with the majority of the SJVAB seeing attainment much sooner (SJVAPCD 2015). The SJVAPCD adopted the 2016 Moderate Area Plan for the 2012 PM2.5 Standard on September 15, 2016. This plan addresses the updated NAAQS 2012 annual PM2.5 standard and includes an attainment impracticability demonstration and request for reclassification of the SJVAB from moderate nonattainment to serious nonattainment (SJVAPCD 2016b). These plans came together when the SJVAPCD adopted the 2018 Plan for the 1997, 2006, and 2012 PM2.5 Standards on November 15, 2018. This plan addresses the federal standards for each of those years (SJVAPCD 2018).

The SJVAPCD adopted the 2024 Plan for the 2012 Annual PM2.5 Standard on June 20, 2024, to fulfill the remaining CAA requirements, including the final modeling analysis, attainment strategy and emission reduction commitments, reasonable further progress/quantitative milestones, and contingency measures. This Plan demonstrates expeditious attainment of the 2012 PM2.5 standard by 2030 (SJVAPCD 2024c).

Rules and Regulations
The following rules promulgated by the SJVAPCD would be applicable to construction of the proposed project (SJVAPCD 2024d):

Rule 4101 Visible Emissions: prohibit the emissions of visible air contaminants to the atmosphere.

Rule 4102 Nuisance: protect the health and safety of the public.

Rule 8021 Construction, Demolition, Excavation, Extraction, and other Earth Moving Activities: limit fugitive dust emissions from construction, demolition, excavation, extraction, and other earthmoving activities.

Greenhouse Gases
Global climate change refers to changes in average climatic conditions on Earth including temperature, wind patterns, precipitation, and storms. Global temperatures are moderated by atmospheric gases.

These gases are commonly referred to as GHGs because they function like a greenhouse by letting sunlight in but preventing heat from escaping, thus warming the Earth’s atmosphere.

GHGs are emitted by natural processes and human (anthropogenic) activities. Anthropogenic GHG emissions are primarily associated with: (1) the burning of fossil fuels during motorized transport, electricity generation, natural gas consumption, industrial activity, manufacturing, and other activities; (2) deforestation; (3) agricultural activity; and (4) solid waste decomposition.

HELIX
Environmental Planning
Letter to Sri Varadaraj Page 7 of 21
July 22, 2024
The GHGs defined under California’s Assembly Bill (AB) 32, described below, include carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). Each GHG differs in its ability to absorb heat in the atmosphere based on the lifetime, or persistence, of the gas molecule in the atmosphere. Estimates of GHG emissions are commonly presented in carbon dioxide equivalents (CO2e), which weigh each gas by its global warming potential (GWP). Expressing GHG emissions in CO2e takes the contribution of all GHG emissions to the greenhouse effect and converts them to a single unit equivalent to the effect that would occur if only CO2 were being emitted. GHG emissions quantities in this analysis are presented in metric tons (MT) of CO2e. For consistency with United Nations Standards, modeling, and reporting of GHGs in California and the U.S. use the GWPs defined in the Intergovernmental Panel on Climate Change’s (IPCC) Fourth Assessment Report (IPCC 2007): CO2 – 1; CH4 – 25; N2O – 298.

Greenhouse Gas Reduction Regulations and Plans
The primary GHG reduction regulatory legislation and plans (applicable to the project) at the State and levels are described below. Implementation of California’s GHG reduction mandates are primarily under the authority of CARB at the State level, and under the authority of the SJVAPCD at the regional level.

Executive Order S-3-05: On June 1, 2005, Executive Order (EO) S-3-05 proclaimed that California is vulnerable to climate change impacts. It declared that increased temperatures could reduce snowpack in the Sierra Nevada, further exacerbate California’s air quality problems, and potentially cause a rise in sea levels. To avoid or reduce climate change impacts, EO S-3-05 calls for a reduction in GHG emissions to the year 2000 level by 2010, to year 1990 levels by 2020, and to 80 percent below 1990 levels by 2050. Executive Orders are not laws and can only provide the governor’s direction to State agencies to act within their authority to reinforce existing laws.

Assembly Bill 32 – Global Warming Solution Act of 2006: The California Global Warming Solutions Act of 2006, widely known as AB 32, requires that CARB develop and enforce regulations for the reporting and verification of Statewide GHG emissions. CARB is directed by AB 32 to set a GHG emission limit, based on 1990 levels, to be achieved by 2020. The bill requires CARB to adopt rules and regulations in an open public process to achieve the maximum technologically feasible and cost-effective GHG emission reductions.

Executive Order B-30-15: On April 29, 2015, EO B-30-15 established a California GHG emission reduction target of 40 percent below 1990 levels by 2030. The EO aligns California’s GHG emission reduction targets with those of leading international governments, including the 28-nation European Union.

California is on track to meet or exceed the target of reducing GHGs emissions to 1990 levels by 2020, as established in AB 32. California’s new emission reduction target of 40 percent below 1990 levels by 2030 will make it possible to reach the goal established by EO S-3-05 of reducing emissions to 80 percent under 1990 levels by 2050.

Senate Bill 32: Signed into law by Governor Brown on September 8, 2016, Senate Bill (SB) 32 (Amendments to the California Global Warming Solutions Action of 2006) extends California’s GHG reduction programs beyond 2020. SB 32 amended the Health and Safety Code to include Section 38566, which contains language to authorize CARB to achieve a Statewide GHG emission reduction of at least 40 percent below 1990 levels by no later than December 31, 2030. SB 32 codified the targets established by EO B-30-15 for 2030, which set the next interim step in the State’s continuing efforts to pursue the long-term target expressed in EO B-30-15 of 80 percent below 1990 emissions levels by 2050. -----------
HELIX Environmental Planning
Letter to Sri Varadaraj Page 8 of 21
July 22, 2024
Executive Order S-01-07: This EO, signed by Governor Schwarzenegger on January 18, 2007, directs that a Statewide goal be established to reduce the carbon intensity of California’s transportation fuels by at least 10 percent by the year 2020. It orders that a Low Carbon Fuel Standard (LCFS) for transportation fuels be established for California and directs CARB to determine whether a LCFS can be adopted as a discrete early action measure pursuant to AB 32. CARB approved the LCFS as a discrete early action item with a regulation adopted and implemented in April 2010. Although challenged in 2011, the Ninth Circuit reversed the District Court’s opinion and rejected arguments that implementing LCFS violates the interstate commerce clause in September 2013. CARB is therefore continuing to implement the LCFS Statewide.

Senate Bill 100: Approved by Governor Brown on September 10, 2018, SB 100 requires that all retail sales of electricity to California end-use customers be procured from 100 percent eligible renewable energy resources and zero-carbon resources by the end of 2045.

Executive Order N-79-20: EO N-79-20, signed by Governor Newsom on September 23, 2020, establishes three goals for the implementation of zero emissions vehicles in California: first, 100 percent of in-State sales of new passenger cars and trucks will be zero-emissions by 2035; second, 100 percent of mediumand heavy-duty vehicles in the State will be zero-emissions vehicles by 2045 for all operations where feasible, and by 2035 for drayage trucks; and third, 100 percent of off-road vehicles and equipment will be zero emissions by 2035 where feasible.

Assembly Bill 1279: Approved by Governor Newsom on September 16, 2022, AB 1279, the California Climate Crisis Act, declares the policy of the State to achieve net zero GHG emissions as soon as possible, but no later than 2045, and achieve and maintain net negative GHG emissions thereafter, and to ensure that by 2045, statewide anthropogenic GHG emissions are reduced to at least 85 percent below the 1990 levels. AB 1279 anticipates achieving these policies through direct GHG emissions reductions, removal of CO2 from the atmosphere (carbon capture), and an almost complete transition away from fossil fuels.

California Air Resources Board Scoping Plan: The Scoping Plan is a strategy CARB develops and updates at least once every five years, as required by AB 32. It lays out the transformations needed across our society and economy to reduce emissions and reach our climate targets. The current 2022 Scoping Plan is the third update to the original plan that was adopted in 2008. The initial 2008 Scoping Plan laid out a path to achieve the AB 32 mandate of returning to 1990 levels of GHG emissions by 2020, a reduction of approximately 15 percent below business as usual. The 2008 Scoping Plan included a mix of incentives, regulations, and carbon pricing, laying out the portfolio approach to addressing climate change and clearly making the case for using multiple tools to meet California’s GHG targets. The 2013 Scoping Plan assessed progress toward achieving the 2020 mandate and made the case for addressing short-lived climate pollutants (SLCPs). The 2017 Scoping Plan also assessed the progress toward achieving the 2020 limit and provided a technologically feasible and cost-effective path to achieving the SB 32 mandate of reducing GHGs by at least 40 percent below 1990 levels by 2030. On December 15, 2022, CARB approved the 2022 Scoping Plan for Achieving Carbon Neutrality (2022 Scoping Plan). The 2022 Scoping Plan lays out a path to achieve targets for carbon neutrality and reduce anthropogenic GHG emissions by 85 percent below 1990 levels no later than 2045, as directed by AB 1279. The actions and outcomes in the plan will achieve significant reductions in fossil fuel combustion by deploying clean technologies and fuels; further reductions in SLCPs; support for sustainable development; increased action on natural and working lands to reduce emissions and sequester carbon; and the capture and storage of carbon (CARB 2022).
-----------
HELIX Environmental Planning
Letter to Sri Varadaraj Page 9 of 21
July 22, 2024
San Joaquin Valley Air Pollution Control District: In December 2009, the SJVAPCD adopted the following guidance documents applicable to the project:
• Guidance for Valley Land-use Agencies in Addressing GHG Emission Impacts for New Projects under CEQA (SJVAPCD 2009a), and
• District Policy: Addressing GHG Emission Impacts for Stationary Source Projects Under CEQA When Serving as the Lead Agency (SJVAPCD 2009b).

This guidance and policy are the documents referenced in the SJVAPCD’s Guidance for Assessing and Mitigating Air Quality Impacts, adopted in March 2015 (SJVAPCD 2015). Consistent with the District Guidance and District Policy above, SJVAPCD acknowledges the current absence of numerical thresholds, and recommends a tiered approach to establish the significance of the GHG impacts on the environment:

1. If a project complies with an approved GHG emission reduction plan or GHG mitigation program which avoids or substantially reduces GHG emissions within the geographic area in which the project is located, then the project would be determined to have a less than significant individual and cumulative impact for GHG emissions;

2. If a project does not comply with an approved GHG emission reduction plan or mitigation program, then it would be required to implement best performance standards (BPS); and

3. If a project is not implementing BPS, then it should demonstrate that its GHG emissions would be reduced or mitigated by at least 29 percent, compared to business-as-usual.

The SJVAPCD adopted a Climate Change Action Plan (CCAP) in 2008 and issued guidance for development project compliance with the plan in 2009. The guidance adopted an approach that relies on the use of BPS to reduce GHG emissions. Projects implementing BPS would be determined to have a less than cumulatively significant impact. For projects not implementing BPS, demonstration of a 29 percent reduction in project-specific (i.e., operational) GHG emissions from business-as-usual conditions is required to determine that a project would have a less than cumulatively significant impact (SJVAPCD 2009a). Both the SJVAPCD CCAP and the guidance for development project compliance are limited to achieving the State 2020 GHG reduction goals mandated by AB 32. The SJVAPCD CCAP and the guidance for development project compliance do not address California’s post-2020 GHG reduction goals. Kern County currently does not have a CAP or other GHG reduction plan which addresses post2020 GHG reductions mandated by SB 32 and AB 1279. The City of Bakersfield is currently in the process of preparing its first Climate Action Plan (CAP), and released a draft CAP for public comment in 2023; however, at the time of this analysis, the City had not adopted the CAP (City 2024).

SENSITIVE RECEPTORS
CARB and the Office of Environmental Health Hazard Assessment (OEHHA) have identified the following groups of individuals as the most likely to be affected by air pollution: adults over 65, children under 14, infants (including in utero in the third trimester of pregnancy), and persons with cardiovascular and chronic respiratory diseases such as asthma, emphysema, and bronchitis (CARB 2005; OEHHA 2015). -----------
HELIX Environmental Planning
Letter to Sri Varadaraj Page 10 of 21
July 22, 2024
Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved and are referred to as sensitive receptors. Examples of these sensitive receptors are residences, schools, hospitals, and daycare centers. The closest existing sensitive receptor to the project site is single-family residential homes located 50 feet from the proposed water mains. The closest school is Independence High School located approximately 350 feet northwest of the proposed 10-inch water main along Old River Road.

METHODOLOGY AND ASSUMPTIONS
Criteria pollutant and precursor emissions, and GHG emissions for the project construction activities were calculated using the California Emissions Estimator Model (CalEEMod), Version 2022.1. CalEEMod is a Statewide land use emissions computer model designed to provide a uniform platform for government agencies, land use planners, and environmental professionals to quantify potential criteria pollutant emissions associated with both construction and operations from a variety of land use projects. The model was developed for the California Air Pollution Control Officers Association (CAPCOA) in collaboration with the California air districts. CalEEMod allows for the use of default data (e.g., emission factors, trip lengths, meteorology, source inventory) provided by the various California air districts to account for local requirements and conditions, and/or user-defined inputs. The model calculates emissions of criteria pollutants, ozone precursors, and GHGs, including PM10, PM2.5, ROGs, NOX, and CO2e. The calculation methodology and input data used in CalEEMod can be found in the CalEEMod User’s Guide Appendices C, D, and G (CAPCOA 2022). The input data and subsequent construction emission estimates for the proposed project are discussed below. The CalEEMod output files are included in Attachment B to this report.

Construction Assumptions
As described above, construction emissions were estimated using CalEEMod. Construction input data for CalEEMod include, but are not limited to, (1) the anticipated start and finish dates of construction activity; (2) inventories of construction equipment to be used; (3) areas to be excavated and graded; and (4) volumes of materials to be exported from and imported to the project area.

Construction of the project is anticipated to begin April 1, 2026, and be completed on December 31, 2026. Most of the pipeline would be installed using convention trenching, commonly known as “cutand-cover”. A short portion of the 10-inch pipeline would be installed underneath an existing irrigation canal/culvert using trenchless tunneling and installation of pipe commonly known as “jack-and-bore”.

The total 1.4-acre disturbed area was estimated based on information provided by the project engineer and it was assumed that the total paved area would be 100 percent asphalt. The construction activity schedule was provided by the project engineer and is outlined in Table 2, Project Construction Schedule, below. It was assumed that all construction activities would occur concurrently. All activities except for jack-and-bore include both the 10-inch pipeline and 8-inch pipeline. -----------
HELIX Environmental Planning
Letter to Sri Varadaraj Page 11 of 21
July 22, 2024
Table 2

PROJECT CONSTRUCTION SCHEDULE
Construction Activity Construction
Start Date
Construction
End Date
Number of
Working Days
Pavement Demolition 4/1/2026 12/31/2026 197
Trenching-Cut 4/1/2026 12/31/2026 197
Trenching-Cover 4/1/2026 12/31/2026 197
Pipeline Installation 4/1/2026 12/31/2026 197
Pavement Repair 4/1/2026 12/31/2026 197
Jack and Bore Preparation 7/1/2026 7/2/2026 2
Jack and Bore 7/3/2026 7/9/2026 5
Jack and Bore Cleanup 7/10/2026 7/13/2026 2
Restriping 12/1/2026 12/5/2026 4
Source: CalEEMod Output (Attachment B)
Construction equipment for each construction activity was provided by the project engineer and was based on CalEEMod defaults. Table 3, Project Construction Equipment, below, presents a summary of the assumed equipment that would be involved in each activity of construction. For this project, a crawler tractor is a Caterpillar PL61 Pipelayer and an off-highway truck is a water truck.

Table 3

PROJECT CONSTRUCTION EQUIPMENT
Construction Activity Equipment Number
Pavement Demolition Tractors/Loaders/Backhoes 2
Concrete/Industrial Saws 2
Off-Highway Trucks 1
Trenching-Cut Excavators 2
Trenching-Cover Tractors/Loaders/Backhoes 2
Rollers 2
Pipeline Installation Crawler Tractors 2
Pavement Repair Tractors/Loaders/Backhoes 2
Pavers 2
Rollers 2
Jack and Bore Preparation Excavators 1
Skid Steer Loaders 1
Tractors/Loaders/Backhoes 1
Jack and Bore Bore/Drill Rigs 1
Excavators 1
Pumps 1
Jack and Bore Cleanup Skid Steer Loaders 1
Tractors/Loaders/Backhoes 1
Restriping Air Compressors 2
Source: CalEEMod Output (Attachment B)
Per the project engineer, 210 tons of old asphalt would be exported during pavement demolition.

Emissions calculations assume application of water during pavement demolition and a 15-mph speed limit on unpaved surfaces in compliance with SJVAPCD Rule 8021, Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities.

I I
I I
HELIX
Environmental Planning
Letter to Sri Varadaraj Page 12 of 21
July 22, 2024
Construction trips were estimated based on information provided by the project engineer and CalEEMod defaults. It was assumed that the project would require five, one-way worker trips per day and one, one-way vendor trip per day for installation of the pipeline. It was also assumed that the project would require one, one-way truckload per day for pavement imports and two, one-way worker trips per day for restriping.

Operational Assumptions
Operation of the proposed project would not result in a population increase and would not generate new vehicle trips beyond occasional maintenance activities. Operation of the project would not require new backup pumps or backup generators. Therefore, changes in project operational emissions would be negligible compared to operational emissions from the existing water systems. Therefore, project operational emissions were not quantified.

STANDARDS OF SIGNIFICANCE
Air Quality
According to Appendix G of the State CEQA Guidelines, a project would have a significant air quality environmental impact if it would:

1. Conflict with or obstruct implementation of the applicable air quality plan; or

2. Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or State ambient air quality standard; or

3. Expose sensitive receptors to substantial pollutant concentrations; or

4. Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.

Appendix G of the State CEQA Guidelines states that the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the above determinations. The SJVAPCD has established significant thresholds to assess the impacts of projectrelated air pollutant emissions. The significance thresholds are updated, as needed, to appropriately represent the most current technical information and attainment status in the SJVAB. Table 4, SJVAPCD Air Quality Significance Thresholds, presents the most current significance thresholds, including thresholds for construction and operational emissions and maximum incremental cancer risk and hazard indices for TACs. A project with emission rates and risk values below these thresholds is generally considered to have a less than significant impact on air quality. -----------
HELIX Environmental Planning
Letter to Sri Varadaraj Page 13 of 21
July 22, 2024
Table 4

SJVAPCD AIR QUALITY SIGNIFICANCE THRESHOLDS
Mass Daily Thresholds (tons per year)
Pollutant Construction Operation
ROG 10 10
NOX 10 10
CO 100 100
PM10 15 15
PM2.5 15 15
SOX 27 27
Toxic Air Contaminants
TACs Maximum Incremental Cancer Risk ≥ 10 in 1 million
Chronic & Acute Hazard Index ≥ 1.0 (project increment)
Source: SJVAPCD 2015
ROG = reactive organic gas; NOX = nitrogen oxides; CO = carbon monoxide; PM10 = coarse particulate matter with a diameter of 10 microns or less; PM2.5 = fine particulate matter with a diameter of

2.5 microns or less; SOX = sulfur oxides; TACs = toxic air contaminants; NO2 = nitrogen dioxide; ppm = parts per million; µg/m3 = micrograms per cubic meter As set forth in the SJVAPCD Guidance for Assessing and Mitigating Air Quality Impacts, any proposed project that would individually have a significant air quality impact would also be considered to have a significant cumulative air quality impact. Impacts of local pollutants (CO, TACs) are cumulatively significant when modeling shows that the combined emissions from the project and other existing and planned projects would exceed air quality standards.

Greenhouse Gas Emissions
Given the relatively small levels of emissions generated by a project in relationship to the total amount of GHG emissions generated on a national or global basis, individual projects are not expected to result in significant, direct impacts with respect to climate change. However, given the magnitude of the impact of GHG emissions on the global climate, GHG emissions from new development could result in significant, cumulative impacts with respect to climate change. Thus, the potential for a significant GHG impact is limited to cumulative impacts. According to Appendix G of the State CEQA Guidelines, the following criteria may be considered in establishing the significance of GHG emissions:

Would the project:

1. Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment?

2. Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs?
The SJVAPCD has adopted the guidance in Guidance for Valley Land-use Agencies in Addressing GHG Emission Impacts for New Projects under CEQA and the policy, Addressing GHG Emission Impacts for Stationary Source Projects Under CEQA When Serving as the Lead Agency. The guidance and policy rely on the use of Best Performance Standards (BPS) to assess the significance of project-specific GHG emissions on global climate change during the environmental review process.

I I
HELIX
Environmental Planning
Letter to Sri Varadaraj Page 14 of 21
July 22, 2024
However, SJVAPCD’s adopted BPS are specifically directed at reducing GHG emissions from stationary sources; therefore, the adopted BPS would not generally be applicable to the proposed project as construction of the pipelines would not be a stationary source of emissions. The SJVAPCD guidance does not limit a lead agency’s authority in establishing its own process and guidance for determining significance of project-related impacts on global climate change.

Neither the County, City, nor the SJVAPCD has adopted a GHG emissions threshold for construction and operational emissions. In the event that a local air district’s guidance for addressing GHG impacts does not use numerical GHG emissions thresholds, at the lead agency’s discretion, GHG thresholds adopted by neighboring California air districts may be used to determine impacts. The Sacramento Metropolitan Air Quality Management District (SMAQMD) has adopted a GHG construction threshold of 1,100 MT CO2e per year for a project’s construction emissions (SMAQMD 2021). A project with an emission rate below this threshold is generally considered to have a less than significant impact on GHG emissions.

AIR QUALITY IMPACT ANALYSIS
(1) Conflict with or obstruct implementation of the applicable air quality plan? Less than Significant Impact. As discussed in Table 4, the SJVAPCD has established thresholds of significance for a project’s criteria pollutant and precursor emissions for both temporary constructionrelated emissions and long-term operational-related emissions. According to the SJVAPCD, these significant thresholds have been established to assist lead agencies in determining whether a project may have a significant air quality impact. A project with emissions lower than the thresholds would not conflict with or obstruct implementation of the district’s air quality plans for attainment of the applicable NAAQS and CAAQS (SJVAPCD 2015). As discussed below, the project would not exceed the temporary construction-related thresholds of significance for criteria pollutants and precursor emissions. Additionally, the project would not result in a population increase and would not generate new vehicle trips, and occasional project maintenance activities would be similar to maintenance activated for the exiting water systems. Operation of the project would not require new pumps or backup generators. Therefore, operational emissions would be negligible.

In addition, control measures in the air quality plans adopted by the SJVAPCD are based in part on growth projections in local planning documents such as the County and City General Plans. The project would not require a change of General Plan land use designation and the project would not result in population or employment growth in the County or City. Therefore, the project would not conflict with or obstruct implementation of the applicable air quality plans and the impact would be less than significant.
(2) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or State ambient air quality standard? Less than Significant Impact. The SJVAB is designated as attainment for PM10; attainment/unclassified for CO, NO2, SO2; extreme nonattainment for 8-hour ozone; and in nonattainment for PM2.5 with respect to federal air quality standards. The SJVAB is designated as attainment for CO, NO2, SO2, and lead; severe nonattainment for 1-hour ozone; and as nonattainment for 8-hour ozone, PM2.5, and PM10 with respect to State air quality standards. The project’s emissions of these criteria pollutants and precursors during construction and operation are evaluated below.
-----------
HELIX Environmental Planning
Letter to Sri Varadaraj Page 15 of 21
July 22, 2024
Construction Emissions
CalEEMod was used to quantify project-generated construction emissions, as discussed in Methodology and Assumptions, above. The model output sheets are included in Attachment B. Construction of the project is anticipated to start April 1, 2026, and be completed on December 31, 2026. The quantity, duration, and intensity of construction activity influence the amount of construction emissions and related pollutant concentrations that occur at any one time. As such, the emission forecasts provided herein reflect a specific set of conservative assumptions based on the expected construction scenario wherein a relatively large amount of construction activity is occurring in a relatively intensive manner.

Because of this conservative assumption, actual emissions could be less than those forecasted. If construction is delayed or occurs over a longer time period, emissions could be reduced because of:
(1) a more modern and cleaner-burning construction equipment fleet mix than assumed in CalEEMod; and/or (2) a less intensive buildout schedule (i.e., fewer daily emissions occurring over a longer time interval).

The project’s construction period emissions of ROG, NOX, CO, SOX, PM10, and PM2.5 were compared to the SJVAPCD construction thresholds in Table 5, Annual Construction Criteria Pollutant and Precursor Emissions. Table 4 presents the most current significance thresholds, including thresholds for construction and operational emissions and maximum incremental cancer risk and hazard indices for TACs. As shown in Table 5, the proposed project’s construction period emissions of ROG, NOX, CO, SOX, PM10, and PM2.5 would not exceed the SJVAPCD thresholds. Therefore, impacts related to constructiongenerated emissions of ROG, NOX, CO, SOX, PM10, and PM2.5 would be less than significant.

Table 5

ANNUAL CONSTRUCTION CRITERIA POLLUTANT AND PRECURSOR EMISSIONS Pollutant Emissions (tons per year)
Construction Activities ROG NOX CO SOX PM10 PM2.5
Pavement Demolition, Trenching-Cut, TrenchingCover, Pipeline Installation, Pavement Repair, Jack and Bore Preparation, Jack and Bore, Jack
and Bore Cleanup, Restriping

0.30 2.37 3.55 0.01 0.23 0.11
SJVAPCD Threshold 10 10 100 27 15 15
Significant Impact? No No No No No No
Source: CalEEMod (output data is provided in Attachment B).

ROG = reactive organic gas; NOX = nitrogen oxides; CO = carbon monoxide; SOX = sulfur oxides; PM10 = coarse particulate matter with a diameter of 10 microns or less; PM2.5 = fine particulate matter with a diameter of 2.5 microns or less; Operational Emissions
As discussed in Methodology and Assumptions, operational emissions were not quantified. Operation of the proposed project would not result in a population increase and would not generate new vehicle trips, and occasional project maintenance activities would be similar to maintenance activated for the exiting water systems. Operation of the project would not require new pumps or backup generators.

Therefore, operational emissions would be negligible, and the impact would be less than significant.

I
I
I
HELIX
Environmental Planning
Letter to Sri Varadaraj Page 16 of 21
July 22, 2024
Impact Conclusion
Construction and operation of the project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment, and the impact would be less than significant.
(3) Expose sensitive receptors to substantial pollutant concentrations? Less than Significant Impact. As discussed in Sensitive Receptors, the closest existing sensitive receptor to the project site is single-family residential homes located 50-feet from the proposed water mains. The closest school is Independence High School located approximately 350 feet northwest of the proposed 10-inch water main along Old River Road.

The dose (of TAC) to which receptors are exposed is the primary factor used to determine health risk.

Dose is a function of the concentration of a substance in the environment and the extent of exposure a person has to the substance; a longer exposure period to a fixed quantity of emissions would result in higher health risks. Current models and methodologies for conducting cancer health risk assessments are associated with longer-term exposure periods (typically 30 years for individual residents based on guidance from OEHHA) and are best suited for evaluation of long-duration TAC emissions with predictable schedules and locations. These assessment models and methodologies do not correlate well with the temporary and highly variable nature of construction activities. Cancer potency factors are based on animal lifetime studies or worker studies where there is long-term exposure to the carcinogenic agent. There is considerable uncertainty in trying to evaluate the cancer risk from projects that will only last a small fraction of a lifetime (OEHHA 2015). Concentrations of mobile source DPM emissions disperse rapidly and are typically reduced by 70 percent at approximately 500 feet (CARB 2005). Considering the highly dispersive nature of DPM and the fact that construction activities would occur for short durations at various locations in the project area, it is not anticipated that construction of the project would expose sensitive receptors to substantial DPM concentrations.

The use of diesel-powered equipment for occasional project operational maintenance would be similar maintenance equipment use for the existing water system. Operation of the project would not require the use of new stationary sources of TACs, such as backup generators. Therefore, construction and operation of the project would not expose sensitive receptors to substantial pollutant concentrations, and the impact would be less than significant.
(4) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
Less than Significant Impact. The project could produce odors during construction activities resulting from heavy diesel equipment exhaust and VOC released during application of asphalt. The odor of these emissions is objectionable to some; however, emissions would disperse rapidly from the project site and therefore should not be at a level that would affect a substantial number of people. Any odors emitted during construction activities would be temporary, short-term, and intermittent in nature, and would cease upon the facility maintenance. As a result, impacts associated with temporary odors during construction are not considered significant.
-----------
HELIX Environmental Planning
Letter to Sri Varadaraj Page 17 of 21
July 22, 2024
The SJVAPCD has developed screening distances for common sources of operational odors, including Wastewater Treatment Facility; Sanitary Landfill; Transfer Station; Composting Facility; Petroleum Refinery; Asphalt Batch Plant; Chemical Manufacturing; Fiberglass Manufacturing; Painting/Coating Operations (e.g., auto body shops); Food Processing Facility; Feed Lot/Dairy; and Rendering Plant (SJVAPCD 2015a). As the project would install water pipelines and fire hydrants, operation of the project would not result in odors affecting a substantial number of people.

Neither construction nor operation of the project would result in other emissions (such as those leading to odors) adversely affecting a substantial number of people, and the impact would be less than significant.

GREENHOUSE GAS EMISSIONS IMPACT ANALYSIS
(1) Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment?
Less than Significant Impact.

Construction Emissions
GHG emissions would be generated by the project during construction from vehicle engine exhaust from construction equipment, on-road trucks, vendor trips, and worker maintenance trips. Construction GHG emissions were calculated using CalEEMod, as described in Methodology and Assumptions. The results of the construction GHG emissions calculations were compared to the SMAQMD threshold in Table 6, Construction GHG Emissions. As shown in Table 6, the construction GHG emissions would not exceed the SMAQMD construction GHG threshold and the impact would be less than significant.

Table 6

CONSTRUCTION GHG EMISSIONS
Year of Emissions Emissions
(MT CO2e)
2026 567
SMAQMD Construction Threshold (per year) 1,100
Exceed Threshold? No
Source: CalEEMod (output data is provided in Attachment B).

MT = metric tons; CO2e = carbon dioxide equivalent
Operational Emissions
As discussed in Methodology and Assumptions, operational emissions were not quantified. Operation of the proposed project would not result in a population increase and would not generate new vehicle trips, and occasional project maintenance activities would be similar to maintenance activated for the exiting water systems. Operation of the project would not require new pumps or backup generators.

The project would not result in changes in water use, and the electricity used by the project to treat and divide water to customers would be similar to the electricity used by the existing water systems.

Therefore, operational GHG emissions would be negligible, and the impact would be less than significant.

HELIX
Environmental Planning
Letter to Sri Varadaraj Page 18 of 21
July 22, 2024
Impact Conclusion
Construction and operation of the project would not generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment. The impact would be less than significant.
(2) Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs?
Less than Significant Impact. There are numerous State plans, policies, and regulations adopted for the purpose of reducing GHG emissions. The principal overall State plan and policy is AB 32, the California Global Warming Solutions Act of 2006. The quantitative goal of AB 32 is to reduce GHG emissions to 1990 levels by 2020. SB 32 requires further reductions of 40 percent below 1990 levels by 2030. AB 1279 requires the State to achieve net zero GHG emissions no later than 2045. The mandates of AB 32, SB 32, and AB 1279 are implemented at the State level by the CARB’s Scoping Plan. Because the project’s operational year is post-2020, the project aims to reach the quantitative goals set by SB 32 and AB 1279.

Statewide plans and regulations such as GHG emissions standards for vehicles and transportation fuels, and regulations requiring an increasing fraction of electricity to be generated from renewable sources are being implemented at the Statewide level; as such, compliance at the project level is not addressed.

Therefore, the proposed project would not conflict with those plans and regulations.

As noted in impact question (1) above, construction GHG emissions would not exceed the GHG thresholds, and would be less than significant. In addition, operation of the proposed project would not result in a population increase and would not result in substantial changes in GHG emissions compared to operation of the existing water systems. As a result, the project would not conflict with the GHG reduction objectives of the State’s Scoping Plan, including net zero GHG emissions by 2045, mandated by AB 1279, or the SJVAPCD’s CCAP. The impact would be less than significant.

CONCLUSION
As described above, the project would not conflict with the SJVAPCD’s air quality attainment and maintenance plans. Project construction emissions of criteria pollutants would be below SJVAPCD construction thresholds. Operation of the proposed project would not result in a population increase, would not require new pumps or backup generators, and would not result in substantial changes in operation criteria pollutant emissions compared to operation of the existing water systems.

Additionally, sensitive receptors would not be exposed to substantial concentrations of TACs or odors.

Therefore, air quality impacts would be less than significant, and no mitigation measures would be required.
-----------
HELIX Environmental Planning
Letter to Sri Varadaraj Page 19 of 21
July 22, 2024
As also described above, construction emissions of GHGs would be below SMAQMD construction threshold. Operation of the proposed project would not result in a population increase and would not result in substantial changes in GHG emissions compared to operation of the existing water systems.

Therefore, GHG emission impacts would be less than significant, and no mitigation measures would be required.

Sincerely,
Martin Rolph Julia Pano
Air Quality Specialist Environmental Planner
Attachments:

Attachment A: Figures
Attachment B: CalEEMod Output

REFERENCES
Bakersfield, City of. 2024. The City of Bakersfield's Draft Climate Action Plan is now available for public review. Available at: https://www.bakersfieldcity.us/1088/Climate-Action-Plan-CAP. Accessed July 15, 2024.

California Air Pollution Control Officers Association (CAPCOA). 2022. User’s Guide for CalEEMod Version 2022.1. Available at: http://www.caleemod.com/.

California Air Resources Board (CARB). 2024. Overview: Diesel Exhaust and Health. Available at:
https://ww2.arb.ca.gov/resources/overview-diesel-exhaust-and-health. 2022. Scoping Plan for Achieving Carbon Neutrality. Accessed July 9, 2024 and available at:
https://ww2.arb.ca.gov/our-work/programs/ab-32-climate-change-scoping-plan/2022-scopingplan-documents. 2005. Air Quality and Land Use Handbook: A Community Health Perspective. Available at:
https://www.arb.ca.gov/ch/handbook.pdf.

Intergovernmental Panel on Climate Change (IPCC). Intergovernmental Panel on Climate Change (IPCC). 2007. Climate Change 2007: The Physical Science Basis. Summary for Policymakers. Contribution of Working Group I to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change. February. Available at: https://www.ipcc.ch/report/ar4/wg1/.

Office of Environmental Health Hazard Assessment (OEHHA). 2015. Air Toxics Hot Spots Program Guidance Manual for Preparation of Health Risk Assessments. Available at:
https://oehha.ca.gov/air/crnr/notice-adoption-air-toxics-hot-spots-program-guidance-manualpreparation-health-risk-0.

HELIX
Environmenral Planning
Letter to Sri Varadaraj Page 20 of 21
July 22, 2024
San Joaquin Valley Air Pollution Control District (SJVAPCD). 2024a. Ambient Air Quality Standards & Valley Attainment Status. Available at: https://www.valleyair.org/aqinfo/attainment.htm. 2024b. Ozone Contingency State Implementation Plan Revision for the 2008 and 2015 8-Hour Ozone Standards. Available at: https://ww2.valleyair.org/media/ovgo2gku/2_-ozonecontingency-sip-update_final-adopted.pdf. 2024c. 2024 Plan for the 2012 Annual PM2.5 Standard. Available at:
https://ww2.valleyair.org/media/gw5bacvj/2024-pm25-plan.pdf. 2024d. Current District Rules and Regulations. Available at: https://ww2.valleyair.org/rules-andplanning/current-district-rules-and-regulations/. 2023. 2023 Maintenance Plan and Redesignation Request for the Revoked 1-hour Ozone Standard. Available at: https://ww2.valleyair.org/media/itoegkch/03-adopted-2023- maintenance-plan-and-redesignation-request-for-the-revoked-1-hour-ozone-standard.pdf. 2022. 2022 Plan for the 2015 8-Hour Ozone Standard. Available at:
https://ww2.valleyair.org/rules-and-planning/air-quality-plans/ozone-plans/2022-ozone-planfor-the-san-joaquin-valley/. 2018. 2018 Plan for 1997, 2006, and 2012 PM2.5 Standards. Available at:
http://www.valleyair.org/pmplans/documents/2018/pm-plan-adopted/2018-Plan-for-the-1997- 2006-and-2012-PM2.5-Standards.pdf.
2016a. 2016 Ozone Plane. June 16. Available at: http://valleyair.org/Air_Quality_Plans/OzonePlan-2016/Adopted-Plan.pdf. 2016b. 2016 Moderate Area Plan for the 2012 PM2.5 Standard. September 15. Available at:
http://www.valleyair.org/Air_Quality_Plans/docs/PM25-2016/2016-Plan.pdf. 2015. Guidance for Assessing and Mitigating Air Quality Impacts. Available at:
https://www.valleyair.org/transportation/GAMAQI-2015/FINAL-DRAFT-GAMAQI.PDF. 2009a. Guidance for Valley Land-use Agencies in Addressing GHG Emission Impacts for New Projects under CEQA. Available at: https://www.valleyair.org/Programs/CCAP/12-17- 09/3%20CCAP%20-%20FINAL%20LU%20Guidance%20-%20Dec%2017%202009.pdf. 2009b. District Policy: Addressing GHG Emission Impacts for Stationary Source Projects Under CEQA When Serving as the Lead Agency. Available at:
https://www.valleyair.org/Programs/CCAP/12-17-
09/2%20CCAP%20-%20FINAL%20District%20Policy%20CEQA%20GHG%20-%20Dec%2017%2020

09.pdf.

Sacramento Metropolitan Air Quality Management District (SMAQMD). 2021. CEQA Guide Chapter 6:

Greenhouse Gas Emissions. Revised February. Available at:
https://www.airquality.org/LandUseTransportation/Documents/Ch6GHG2-26-2021.pdf.

HELIX
Environmental Planning
Letter to Sri Varadaraj Page 21 of 21
July 22, 2024
U.S. Environmental Protection Agency (USEPA). 2016. Determination of Attainment of the 1-Hour Ozone National Ambient Air Quality Standard in the San Joaquin Valley Nonattainment Area in California. July. Available at: https://www.federalregister.gov/documents/2016/07/18/2016- 16792/determination-of-attainment-of-the-1-hour-ozone-national-ambient-air-qualitystandard-in-the-san.

Western Regional Climate Center (WRCC). 2019. 1937-2016 Monthly Climate Summary, Bakersfield Airport, California (040442). Accessed July 15, 2024 and available at: https://wrcc.dri.edu/cgibin/cliMAIN.pl?ca0442.

HELIX
Environmental Planning
Attachment A
Figures
Bakersfield
District Blvd
S Allen Rd
Berkshire Rd
Shafter Rd
Old
River Rd Old River Rd
McCutchen Rd
Harris Rd
Houghton Rd
Buena Vista Rd
Panama Ln
Ashe Rd
Gosford Rd
Stine Rd
Figure 1
Site and Vicinity Map
T:\PROJECTS\C\CarolloEngineers_02632\00014_SouthKernOldRiverMunicipalISMND\Map\Map\South Kern Old River MWC.aprx 4/3/2024 Source: Base Map Layers (Esri, USGS, NGA, NASA)
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System Los Angeles
San
Luis
Obispo
Santa
Barbara Ventura
Kern
USGS 7.5 Min. Gosford Quad
Township 31S, Range 27E, Section 5
Approximate Location:
-119.1086875 35.2652880
NAD 1983 State Plane CA Zone V (US Feet)
Approximate Acreage: ±20.35 Acres
0 1 Miles
Old River MWC
South Kern MWC
Project Location
10" Water Main
N
A
H Env,~ Eo Lnme'n!anning
(
I
I
Old River Rd
0 800 Feet
Figure 2
Project Location and Mutual
Water Company Site Locations
T:\PROJECTS\C\CarolloEngineers_02632\00014_SouthKernOldRiverMunicipalISMND\Map\Map\South Kern Old River MWC.aprx 8x11P 4/4/2024 Source: Aerial (Maxar, 2022)
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System Old River Mutual Water Company
South Kern Mutual Water Company
10" Water Main
8" Water Main
CJ
E---3 E---3
HELIX
Environmenta/Planning ----------------------------------- Old River Rd
0 1,200 Feet
Figure 3
Site Plan
T:\PROJECTS\C\CarolloEngineers_02632\00014_SouthKernOldRiverMunicipalISMND\Map\Map\South Kern Old River MWC.aprx Fig3_Site Plan 4/4/2024 Source: Aerial (Maxar, 2022)
Consolidation of South Kern and Old River Mutual Water Companies into the City of Bakersfield Water System Fire Hydrant Location
1" Water Main
8" Water Main
Prop. 10" Water Line (Extends up to
McCutchen Rd and Ties-In to Existing 10"
Water Line, approx 1.0 Mile North)
Prop. Trenchless Installations Under Old
River Road, Stine Canal 3-48" Diameter
Culvert, and Taft Hwy 119
Prop. 8" Water Line
Extends in to Old River
MWC Streets
O
dl River Rd
HELIX
Environmental Planning----------------------------------------------------- Attachment B
CalEEMod Output
South Kern Detailed Report, 7/11/2024
South Kern Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year, Unmitigated

3. Construction Emissions Details

3.1. Pavement Demolition (2026) - Unmitigated

3.3. Pipe Installation (2026) - Unmitigated

3.5. Pavement Repair (2026) - Unmitigated

3.7. Restriping (2026) - Unmitigated

3.9. Trenching-Cut (2026) - Unmitigated

3.11. Trenching-Cover (2026) - Unmitigated

3.13. Jack and Bore Prep (2026) - Unmitigated
1 / 33
South Kern Detailed Report, 7/11/2024

3.15. Jack and Bore (2026) - Unmitigated

3.17. Jack and Bore Cleanup (2026) - Unmitigated

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

5. Activity Data

5.1. Construction Schedule

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
2 / 33
South Kern Detailed Report, 7/11/2024

5.6.2. Construction Earthmoving Control Strategies

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores
3 / 33
South Kern Detailed Report, 7/11/2024

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data
4 / 33
South Kern Detailed Report, 7/11/2024

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name South Kern
Construction Start Date 4/1/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70
Precipitation (days) 18.0
Location 8227 Old River Rd, Bakersfield, CA 93311, USA
County Kern-San Joaquin
City Bakersfield
Air District San Joaquin Valley APCD
Air Basin San Joaquin Valley
TAZ 2811
EDFZ 5
Electric Utility Pacific Gas & Electric Company
Gas Utility Southern California Gas
App Version 2022.1.1.26

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Other Asphalt
Surfaces

1.40 Acre 1.40 0.00 0.00 — — —
5 / 33
South Kern Detailed Report, 7/11/2024

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Daily,
Summer
(Max)
— — — — — — — — — — — —
Unmit. 3.89 3.28 26.6 41.7 0.06 1.03 1.54 2.58 0.95 0.26 1.21 7,150 Daily, Winter
(Max)
— — — — — — — — — — — —
Unmit. 8.05 7.45 25.7 38.0 0.06 0.99 1.50 2.50 0.92 0.25 1.17 6,598 Average
Daily (Max)
— — — — — — — — — — — —
Unmit. 1.95 1.65 13.0 19.5 0.03 0.51 0.76 1.28 0.47 0.13 0.60 3,425 Annual (Max) — — — — — — — — — — — —
Unmit. 0.36 0.30 2.37 3.55 0.01 0.09 0.14 0.23 0.09 0.02 0.11 567

2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 6 / 33
Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Daily -
Summer
(Max)
— — — — — — — — — — — —
2026 3.89 3.28 26.6 41.7 0.06 1.03 1.54 2.58 0.95 0.26 1.21 7,150 Daily -
Winter (Max)
— — — — — — — — — — — —
2026 8.05 7.45 25.7 38.0 0.06 0.99 1.50 2.50 0.92 0.25 1.17 6,598 -------------
-------------
South Kern Detailed Report, 7/11/2024
Average
Daily
— — — — — — — — — — — —
2026 1.95 1.65 13.0 19.5 0.03 0.51 0.76 1.28 0.47 0.13 0.60 3,425 Annual — — — — — — — — — — — —
2026 0.36 0.30 2.37 3.55 0.01 0.09 0.14 0.23 0.09 0.02 0.11 567

3. Construction Emissions Details

3.1. Pavement Demolition (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Onsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.93 0.77 6.34 8.97 0.02 0.19 — 0.19 0.17 — 0.17 1,741
Demolition — — — — — — 0.01 0.01 — < 0.005 < 0.005 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.93 0.77 6.34 8.97 0.02 0.19 — 0.19 0.17 — 0.17 1,741
Demolition — — — — — — 0.01 0.01 — < 0.005 < 0.005 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — —
Off-Road
Equipment

0.50 0.42 3.42 4.84 0.01 0.10 — 0.10 0.09 — 0.09 940
Demolition — — — — — — 0.01 0.01 — < 0.005 < 0.005 —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 / 33
-------------
South Kern Detailed Report, 7/11/2024
Annual — — — — — — — — — — — —
Off-Road
Equipment

0.09 0.08 0.62 0.88 < 0.005 0.02 — 0.02 0.02 — 0.02 156 Demolition — — — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Worker 0.06 0.05 0.05 0.87 0.00 0.00 0.15 0.15 0.00 0.04 0.04 167 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.02 < 0.005 < 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 19.1 Daily, Winter
(Max)
— — — — — — — — — — — —
Worker 0.05 0.05 0.06 0.59 0.00 0.00 0.15 0.15 0.00 0.04 0.04 147 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.02 < 0.005 < 0.005 < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 19.1 Average
Daily
— — — — — — — — — — — —
Worker 0.03 0.03 0.03 0.35 0.00 0.00 0.08 0.08 0.00 0.02 0.02 82.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 10.3 Annual — — — — — — — — — — — —
Worker 0.01 < 0.005 0.01 0.06 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 13.6 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 1.71

3.3. Pipe Installation (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e -------------
8 / 33
South Kern Detailed Report, 7/11/2024
Onsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.65 0.55 4.82 6.32 0.01 0.27 — 0.27 0.25 — 0.25 1,043
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.65 0.55 4.82 6.32 0.01 0.27 — 0.27 0.25 — 0.25 1,043
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — —
Off-Road
Equipment

0.35 0.30 2.60 3.41 0.01 0.14 — 0.14 0.13 — 0.13 563
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Off-Road
Equipment

0.06 0.05 0.47 0.62 < 0.005 0.03 — 0.03 0.02 — 0.02 93.2 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Worker 0.05 0.04 0.04 0.69 0.00 0.00 0.12 0.12 0.00 0.03 0.03 134 Vendor < 0.005 < 0.005 0.07 0.02 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 0.01 67.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Worker 0.04 0.04 0.05 0.47 0.00 0.00 0.12 0.12 0.00 0.03 0.03 117 Vendor < 0.005 < 0.005 0.08 0.02 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 0.01 67.2 9 / 33
South Kern Detailed Report, 7/11/2024
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — —
Worker 0.02 0.02 0.02 0.28 0.00 0.00 0.07 0.07 0.00 0.02 0.02 65.8 Vendor < 0.005 < 0.005 0.04 0.01 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 36.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 10.9 Vendor < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 6.01 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.5. Pavement Repair (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Onsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.89 0.75 6.85 9.91 0.01 0.30 — 0.30 0.27 — 0.27 1,500
Paving 0.02 0.02 — — — — — — — — — —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.89 0.75 6.85 9.91 0.01 0.30 — 0.30 0.27 — 0.27 1,500
Paving 0.02 0.02 — — — — — — — — — —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — —
10 / 33
-------------
South Kern Detailed Report, 7/11/2024
Off-Road
Equipment

0.48 0.40 3.70 5.35 0.01 0.16 — 0.16 0.15 — 0.15 810
Paving 0.01 0.01 — — — — — — — — — —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Off-Road
Equipment

0.09 0.07 0.67 0.98 < 0.005 0.03 — 0.03 0.03 — 0.03 134 Paving < 0.005 < 0.005 — — — — — — — — — —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Worker 0.07 0.07 0.06 1.04 0.00 0.00 0.18 0.18 0.00 0.04 0.04 201 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.16 0.03 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 142 Daily, Winter
(Max)
— — — — — — — — — — — —
Worker 0.06 0.06 0.07 0.71 0.00 0.00 0.18 0.18 0.00 0.04 0.04 176 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.17 0.04 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 142 Average
Daily
— — — — — — — — — — — —
Worker 0.04 0.03 0.03 0.42 0.00 0.00 0.10 0.10 0.00 0.02 0.02 98.7 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.09 0.02 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 76.7 Annual — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.08 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 16.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 < 0.005 0.02 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 12.7 11 / 33
South Kern Detailed Report, 7/11/2024

3.7. Restriping (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 12 / 33
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Onsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Daily, Winter
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.29 0.24 1.71 2.27 < 0.005 0.05 — 0.05 0.04 — 0.04 268 Architectural
Coatings

4.24 4.24 — — — — — — — — — —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 2.94 Architectural
Coatings

0.05 0.05 — — — — — — — — — —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.49 Architectural
Coatings

0.01 0.01 — — — — — — — — — —
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Daily, Winter
(Max)
— — — — — — — — — — — —
-------------
South Kern Detailed Report, 7/11/2024
Worker 0.02 0.02 0.02 0.19 0.00 0.00 0.05 0.05 0.00 0.01 0.01 46.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.53 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.09 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.9. Trenching-Cut (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Onsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.23 0.19 1.64 2.04 < 0.005 0.05 — 0.05 0.04 — 0.04 284 Onsite truck < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 0.74 0.74 < 0.005 0.07 0.07 3.61 Daily, Winter
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.23 0.19 1.64 2.04 < 0.005 0.05 — 0.05 0.04 — 0.04 284 Onsite truck < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 0.74 0.74 < 0.005 0.07 0.07 3.66 Average
Daily
— — — — — — — — — — — —
13 / 33
-------------
South Kern Detailed Report, 7/11/2024
Off-Road
Equipment

0.12 0.10 0.89 1.10 < 0.005 0.03 — 0.03 0.02 — 0.02 153 Onsite truck < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 0.38 0.38 < 0.005 0.04 0.04 1.96 Annual — — — — — — — — — — — —
Off-Road
Equipment

0.02 0.02 0.16 0.20 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 25.4 Onsite truck < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.07 0.07 < 0.005 0.01 0.01 0.32 Offsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Worker 0.02 0.02 0.02 0.35 0.00 0.00 0.06 0.06 0.00 0.01 0.01 66.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Worker 0.02 0.02 0.02 0.24 0.00 0.00 0.06 0.06 0.00 0.01 0.01 58.6 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.14 0.00 0.00 0.03 0.03 0.00 0.01 0.01 32.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 5.45 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.11. Trenching-Cover (2026) - Unmitigated
14 / 33
South Kern Detailed Report, 7/11/2024
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 15 / 33
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Onsite — — — — — — — — — — — —
Daily, — — — — — — — — — — — —
Summer
(Max)
Off-Road 0.55 0.46 3.81 5.79 0.01 0.14 — 0.14 0.13 — 0.13 867 Equipment
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter — — — — — — — — — — — —
(Max)
Off-Road 0.55 0.46 3.81 5.79 0.01 0.14 — 0.14 0.13 — 0.13 867 Equipment
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average — — — — — — — — — — — —
Daily
Off-Road 0.30 0.25 2.06 3.13 < 0.005 0.08 — 0.08 0.07 — 0.07 468 Equipment
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Off-Road 0.05 0.05 0.38 0.57 < 0.005 0.01 — 0.01 0.01 — 0.01 77.5 Equipment
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — —
Daily, — — — — — — — — — — — —
Summer
(Max)
Worker 0.05 0.04 0.04 0.69 0.00 0.00 0.12 0.12 0.00 0.03 0.03 134 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter — — — — — — — — — — — —
(Max)
Worker 0.04 0.04 0.05 0.47 0.00 0.00 0.12 0.12 0.00 0.03 0.03 117 -------------
South Kern Detailed Report, 7/11/2024
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — —
Worker 0.02 0.02 0.02 0.28 0.00 0.00 0.07 0.07 0.00 0.02 0.02 65.8 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.05 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 10.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.13. Jack and Bore Prep (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Onsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.31 0.26 2.69 4.43 0.01 0.08 — 0.08 0.08 — 0.08 679
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.01 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 3.72 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
16 / 33
-------------
South Kern Detailed Report, 7/11/2024
Off-Road
Equipment
< 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.62 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Worker 0.04 0.03 0.03 0.52 0.00 0.00 0.09 0.09 0.00 0.02 0.02 100 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.50 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.08 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.15. Jack and Bore (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Onsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.32 0.27 2.64 3.83 0.01 0.08 — 0.08 0.07 — 0.07 610
17 / 33
-------------
South Kern Detailed Report, 7/11/2024
Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.04 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 8.35 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 1.38 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Worker 0.04 0.03 0.03 0.52 0.00 0.00 0.09 0.09 0.00 0.02 0.02 100 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 1.25 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.21 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 / 33
South Kern Detailed Report, 7/11/2024

3.17. Jack and Bore Cleanup (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Onsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Off-Road
Equipment

0.19 0.16 1.87 3.41 < 0.005 0.06 — 0.06 0.05 — 0.05 537 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.01 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 2.94 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.49 Onsite truck 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — —
Worker 0.02 0.02 0.02 0.35 0.00 0.00 0.06 0.06 0.00 0.01 0.01 66.9 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Daily, Winter
(Max)
— — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — —
19 / 33
-------------
South Kern Detailed Report, 7/11/2024
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.33 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 0.06 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetation TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Daily,
Summer
(Max)
— — — — — — — — — — — —
Total — — — — — — — — — — — —
Daily, Winter
(Max)
— — — — — — — — — — — —
Total — — — — — — — — — — — —
Annual — — — — — — — — — — — —
Total — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e 20 / 33
-------------
-------------
South Kern Detailed Report, 7/11/2024
Daily,
Summer
(Max)
— — — — — — — — — — — —
Total — — — — — — — — — — — —
Daily, Winter
(Max)
— — — — — — — — — — — —
Total — — — — — — — — — — — —
Annual — — — — — — — — — — — —
Total — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T CO2e Daily,
Summer
(Max)
— — — — — — — — — — — —
Avoided — — — — — — — — — — — —
Subtotal — — — — — — — — — — — —
Sequestered — — — — — — — — — — — —
Subtotal — — — — — — — — — — — —
Removed — — — — — — — — — — — —
Subtotal — — — — — — — — — — — —
— — — — — — — — — — — — —
Daily, Winter
(Max)
— — — — — — — — — — — —
Avoided — — — — — — — — — — — —
Subtotal — — — — — — — — — — — —
Sequestered — — — — — — — — — — — —
Subtotal — — — — — — — — — — — —
Removed — — — — — — — — — — — —
21 / 33
-------------
South Kern Detailed Report, 7/11/2024
Subtotal — — — — — — — — — — — —
— — — — — — — — — — — — —
Annual — — — — — — — — — — — —
Avoided — — — — — — — — — — — —
Subtotal — — — — — — — — — — — —
Sequestered — — — — — — — — — — — —
Subtotal — — — — — — — — — — — —
Removed — — — — — — — — — — — —
Subtotal — — — — — — — — — — — —
— — — — — — — — — — — — —

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Pavement Demolition Demolition 4/1/2026 12/31/2026 5.00 197 — Pipe Installation Building Construction 4/1/2026 12/31/2026 5.00 197 — Pavement Repair Paving 4/1/2026 12/31/2026 5.00 197 —
Restriping Architectural Coating 12/1/2026 12/5/2026 5.00 4.00 — Trenching-Cut Trenching 4/1/2026 12/31/2026 5.00 197 —
Trenching-Cover Trenching 4/1/2026 12/31/2026 5.00 197 — Jack and Bore Prep Trenching 7/1/2026 7/2/2026 5.00 2.00 — Jack and Bore Trenching 7/3/2026 7/9/2026 5.00 5.00 —
Jack and Bore Cleanup Trenching 7/10/2026 7/13/2026 5.00 2.00 —

5.2. Off-Road Equipment

5.2.1. Unmitigated
22 / 33
South Kern Detailed Report, 7/11/2024
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Pavement Demolition Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Pavement Demolition Concrete/Industrial
Saws
Diesel Average 2.00 8.00 33.0 0.73
Pavement Demolition Off-Highway Trucks Diesel Average 1.00 4.00 376 0.38 Pipe Installation Crawler Tractors Diesel Average 2.00 8.00 130 0.43 Pavement Repair Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Pavement Repair Pavers Diesel Average 2.00 8.00 81.0 0.42 Pavement Repair Rollers Diesel Average 2.00 8.00 36.0 0.38 Restriping Air Compressors Diesel Average 2.00 6.00 37.0 0.48 Trenching-Cut Excavators Diesel Average 2.00 8.00 36.0 0.38 Trenching-Cover Tractors/Loaders/Back
hoes
Diesel Average 2.00 8.00 84.0 0.37
Trenching-Cover Rollers Diesel Average 2.00 8.00 36.0 0.38 Jack and Bore Prep Excavators Diesel Average 1.00 8.00 36.0 0.38 Jack and Bore Prep Skid Steer Loaders Diesel Average 1.00 8.00 71.0 0.37 Jack and Bore Prep Tractors/Loaders/Back
hoes
Diesel Average 1.00 8.00 84.0 0.37
Jack and Bore Bore/Drill Rigs Diesel Average 1.00 8.00 83.0 0.50 Jack and Bore Excavators Diesel Average 1.00 8.00 36.0 0.38 Jack and Bore Pumps Diesel Average 1.00 8.00 11.0 0.74
Jack and Bore
Cleanup
Skid Steer Loaders Diesel Average 1.00 8.00 71.0 0.37
Jack and Bore
Cleanup
Tractors/Loaders/Back
hoes
Diesel Average 1.00 8.00 84.0 0.37

5.3. Construction Vehicles

5.3.1. Unmitigated
23 / 33
South Kern Detailed Report, 7/11/2024
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Pavement Demolition — — — —
Pavement Demolition Worker 12.5 17.3 LDA,LDT1,LDT2
Pavement Demolition Vendor — 10.6 HHDT,MHDT
Pavement Demolition Hauling 0.27 20.0 HHDT
Pavement Demolition Onsite truck — — HHDT
Pipe Installation — — — —
Pipe Installation Worker 10.0 17.3 LDA,LDT1,LDT2
Pipe Installation Vendor 2.00 10.6 HHDT,MHDT
Pipe Installation Hauling 0.00 20.0 HHDT
Pipe Installation Onsite truck — — HHDT
Pavement Repair — — — —
Pavement Repair Worker 15.0 17.3 LDA,LDT1,LDT2
Pavement Repair Vendor — 10.6 HHDT,MHDT
Pavement Repair Hauling 2.00 20.0 HHDT
Pavement Repair Onsite truck — — HHDT
Restriping — — — —
Restriping Worker 4.00 17.3 LDA,LDT1,LDT2
Restriping Vendor — 10.6 HHDT,MHDT
Restriping Hauling 0.00 20.0 HHDT
Restriping Onsite truck — — HHDT
Trenching-Cut — — — —
Trenching-Cut Worker 5.00 17.3 LDA,LDT1,LDT2
Trenching-Cut Vendor — 10.6 HHDT,MHDT
Trenching-Cut Hauling 0.00 20.0 HHDT
Trenching-Cut Onsite truck 1.00 0.50 HHDT
Trenching-Cover — — — —
Trenching-Cover Worker 10.0 17.3 LDA,LDT1,LDT2
24 / 33
South Kern Detailed Report, 7/11/2024
Trenching-Cover Vendor — 10.6 HHDT,MHDT
Trenching-Cover Hauling 0.00 20.0 HHDT
Trenching-Cover Onsite truck — — HHDT
Jack and Bore Prep — — — —
Jack and Bore Prep Worker 7.50 17.3 LDA,LDT1,LDT2
Jack and Bore Prep Vendor — 10.6 HHDT,MHDT
Jack and Bore Prep Hauling 0.00 20.0 HHDT
Jack and Bore Prep Onsite truck — — HHDT
Jack and Bore — — — —
Jack and Bore Worker 7.50 17.3 LDA,LDT1,LDT2
Jack and Bore Vendor — 10.6 HHDT,MHDT
Jack and Bore Hauling 0.00 20.0 HHDT
Jack and Bore Onsite truck — — HHDT
Jack and Bore Cleanup — — — —
Jack and Bore Cleanup Worker 5.00 17.3 LDA,LDT1,LDT2
Jack and Bore Cleanup Vendor — 10.6 HHDT,MHDT
Jack and Bore Cleanup Hauling 0.00 20.0 HHDT
Jack and Bore Cleanup Onsite truck — — HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.

5.5. Architectural Coatings
Phase Name Residential Interior Area Residential Exterior Area Non-Residential Interior Area Non-Residential Exterior Area Parking Area Coated (sq ft) Coated (sq ft) Coated (sq ft) Coated (sq ft) Coated (sq ft) Restriping 0.00 0.00 0.00 0.00 3,659
25 / 33
South Kern Detailed Report, 7/11/2024

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (Ton of Debris)
Acres Paved (acres)
Pavement Demolition 0.00 0.00 0.00 210 —
Pavement Repair 0.00 0.00 0.00 0.00 1.40

5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
Water Demolished Area 2 36% 36%

5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Other Asphalt Surfaces 1.40 100%

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00 204 0.03 < 0.005

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
26 / 33
South Kern Detailed Report, 7/11/2024
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 22.0 annual days of extreme heat Extreme Precipitation 0.00 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.00 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

← All documents from this meeting