Cities Index.
Agenda

Bakersfield City Council
November 18, 2026

Document
Agenda
Meeting
November 18, 2026
Body
Bakersfield City Council
Pages
70
Original file
66.6 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

Staff recommend approval of amendment.

BACKGROUND:

The Wastewater Division operates and maintains a variety of pumps throughout Wastewater Treatment Plants No. 2 and No. 3 that are essential to daily treatment operations. These pumps require routine maintenance, repairs, and occasional emergency services to ensure reliable operation and minimize equipment downtime. This on-call pump repair and maintenance services agreement allows the Division to address equipment failures in a timely manner, maintain operational efficiency, and reduce the risk of disruptions to wastewater treatment processes.

On February 5, 2026, the City entered into Agreement No. WR26-006 with Surface Pumps, Inc. to provide on-call pump repair and maintenance services for the Wastewater Division. Surface Pumps, Inc. was selected through a formal Request for Qualifications process and awarded an initial one-year agreement.

Since the agreement's execution, Surface Pumps has performed various maintenance and repair services at Wastewater Treatment Plants No. 2 and No. 3, including rebuilding a booster blower compressor and multiple pumps, performing laser alignment of aeration basin blower motors, procuring new sump pumps for digester and primary clarifier pits, and assisting with the disassembly of a centrifuge feed pump at Wastewater Treatment Plant No. 3.

At this time, due to the continued need for on-call pump repair and maintenance services to support proper facility operations, staff recommend extending the term by one year and increasing compensation by $100,000, for a revised total not to exceed $200,000. This adjustment is in accordance with the original Agreement and will allow the Wastewater Division to continue addressing routine on-call services without interruption to service.

FISCAL IMPACT:

Sufficient funds are budgeted in the Sewer Enterprise Fund for this amendment, therefore, there is no impact to the City General Fund associated with this amendment.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

1. Amendment No. 1

2. Exhibit B

Corporate Office
3301 Unicorn Road
Bakersfield, CA 93308
P.O. Box 5757
Bakersfield, CA 93388
661-393-1545
[email protected]
Branch Office
2270 Mahoney Road
Santa Maria, CA 93455
805-928-3681
Bakersfield Public Works Labor Rates Per Hour
Role Standard Rate Overtime Rate Double Time Rate Effective Date Field Lead Mechanic $175 $248 $321 April 1, 2026
Pump Shop Labor $140 $210 $280 April 1, 2026
Machine Shop Labor $165 $247.50 $330 April 1, 2026
Compressor Mechanic $175 $248 $321 April 1, 2026
Additional Services
Service Rate Unit of Measure Effective Date
Laser Alignment $200 Per Unit April 1, 2026
Transportation Charge $90 Per Hour April 1, 2026
Fuel Surcharge $1 Per Mile April 1, 2026
Subsistence Charge $255 Per Day April 1, 2026
Hazardous Waste Disposal Fee $18 Per Unit April 1, 2026 Prep & Clean Unit $30 Per Hour April 1, 2026
Consumables $40 PerJob April 1, 2026
Service Truck $30 Per Hour April 1, 2026
Terms and Conditions
• Standard labor rates apply Monday through Friday, 7:00 a.m. to 3:30 p.m. Overtime rates apply to work performed outside of these hours.

Double-time rates apply after twelve (12) continuous hours of work and on recognized holidays. • Field labor, mobilization, and equipment transportation (pickup or delivery) are subject to a minimum charge of two (2) hours. • Machine shop overtime and double-time work require a minimum staffing level of two (2) qualified employees and will be billed accordingly. • Special tooling, rental equipment, or safety equipment supplied by Surface Pumps, Inc. at the request of the customer will be billed at the prevailing rates in effect at the time of use.
• All rates are subject to change with thirty (30) days written notice to the customer.

Travel and Standby Time
• Travel time, mobilization, and standby time will be billed at the applicable labor rate unless otherwise agreed to in writing. 10/30/2026

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Gary Hallen, Assistant City Manager
DATE: November 10, 2026
SUBJECT: Amendment No. 1 to Agreement No. CM26-040 ($863,573.72) for tenant improvements at the City building located at 1430 and 1440 Truxtun Ave. for the Bakersfield Police Department to move staff and operations from 4550 California Ave. (Ward 2) RECOMMENDATION:

Staff recommends Council approve the amendment to the agreement.

BACKGROUND:

On March 11, 2026, City Council approved the lease and option to purchase the Real Property located at 1430 and 1440 Truxtun Avenue (Truxtun Tower). The property consists of a 10-story office building with approximately 127,504 square feet of office space with a parking garage located on 2.3 acres of land on a prime corner in downtown Bakersfield in near proximity to City Hall.

On August 26, 2026, City Council approved the appropriation of the funds necessary for the purchase of the building along with an additional $1,100,000 for tenant improvementsto prepare modify vacant areas for the Bakersfield Police Department. On September 8, 2026, the City closed escrow on the building and became the owner.

The building was purchased to provide additional office space, in the downtown core, for City Departments as space is needed due to growth. There is an immediate need for the Police Department to vacate their current leased office space at 4550 California Avenue by the end of January 2027 when their lease expires. In order to accomplish this transition, in the very tight time frame and to have continuity of service, the City entered into Department Agreement CM26-040 with MD Atkinson (MDA). MDA is the long-standing property management company of the building who has also served as the general contractor for tenant improvements in the building for years. The scope of work for this agreement is to work as a project manager and general contractor to tailor the vacant areas of Truxtun Tower to fit the needs of the Police Department. We have now completed the designs for the modifications and MDA has provided us with the cost to complete the necessary improvements to accommodate the initial needs for the Police Department to move.

Therefore, we are requesting Amendment 1 to Agreement CM26-040 to increase compensation from $100,000 to $863,573.72 for the completion of the necessary improvements. The amendment also changes the mutual hold harmless language to a mutual indemnity as requested by MDA and reviewed by City Legal staff. These improvements are necessary to facility the police department moving to the Truxtun Towers property prior to the end of their lease at California Ave.

FISCAL IMPACT:

The funds for the improvements were appropriated on August 26, 2026, and were included in the interdepartmental loan for the property. This agreement is within the budget and allocation originally contemplated. In the event, these Truxtun Tower improvements are not completed timely, and the BPD is unable to move out of the leased property at 4550 California Ave., by the end of January 2027, the monthly expense to the City will be in excess of the current budget. However, with the approval of this agreement its anticipated to keep this project on track for BPD to move into Truxtun Towers in time for moving out.

COUNCIL GOAL:

Safety and Resilience
Innovative and Efficient City Government
ATTACHMENTS:

1. Agreement CM26-040

2. Amendment No. 1

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Gregory Pronovost
DATE: November 4, 2026
SUBJECT: Amendment No. 3 to Agreement No. 2323-267 with ImageTrend, LLC) (increase compensation by $14,005.83; revised not to exceed $940,511.69) for software for the Fire Department
RECOMMENDATION:

Staff recommend approval of this agreement
BACKGROUND:

On November 29, 2023, the city entered into Agreement 2023-267 with lmageTrend, LLC to acquire ImageTrend software and training resources. This software enables the integration of existing Emergency Medical Services (EMS) systems, streamlining the preparation of reports required by the state of California for the Bakersfield Fire Department.

The city is putting Agreement No. 3 2023-267 before the Council to request an amendment to Agreement No. 2023-267 to include an additional module and align it to the other software term dates for the three-year term, increasing the compensation by $14,005.83 and a NEW total not to exceed of $94,511.69.

FISCAL IMPACT:

The action to amend this agreement will be funded in the Fiscal Year 2026-27 Fire Department budget, it will only use the CUPA Operating Budget which are fee’s collected not through the City’s General Fund.

COUNCIL GOAL:

Safety and Resilience
ATTACHMENTS:

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent – Agreements TO: Honorable Mayor and City Council
FROM: Zachary Meyer, Public Works Director
DATE: October 27, 2026
SUBJECT: Amendment No. 3 to Agreement No. 2023-294 with The Open Door Network (increase compensation by $322,400 and extend term to December 13, 2027) to continue recycling and sorting materials at the Mt Vernon Organics Recycling & Composting Facility. (Ward 1)
RECOMMENDATION:

Staff recommends approval of this Amendment.

BACKGROUND:

Organic materials collected through the City's residential curbside and commercial green waste programs are transported to the Mount Vernon Organics Recycling and Composting Facility (Facility), located at 2601 Mount Vernon Avenue, for processing. As part of the processing operations, commingled organic materials must be sorted to remove nonorganic contaminants. The Facility utilizes a sorting crew to manually separate these materials, ensuring the efficient processing of organic waste and supporting the City's recycling and waste diversion efforts.

In October 2023, the City issued a Request for Proposals (RFP) for recycling and sorting services at the Facility and received two proposals. Following an evaluation of the submissions, The Open Door Network was selected based on its relevant experience and competitive pricing.  On December 13, 2023, Council approved Agreement No. 2023-294 with The Open Door Network for recycling and sorting services, in an amount not to exceed $300,000, for an initial one-year term with the option of four additional one-year extensions, contingent upon satisfactory performance.
 On January 8, 2025, Council approved Amendment No. 1 to Agreement No. 2023-294, increasing the total compensation to an amount not to exceed $605,760 and extending the agreement for one year, with the option of three additional one-year extensions, contingent upon satisfactory performance.
 On November 19, 2025, Council approved Amendment No. 2 to Agreement No. 2023-294, extending the agreement through December 13, 2026, with the option of two additional one-year extensions, and increasing compensation by $305,760, for a revised total not-to-exceed amount of $911,520.

To ensure the continued availability of essential recycling and sorting services at the Facility, staff recommends approval of Amendment No. 3 to Agreement No. 2023-294 with The Open Door Network.

The proposed amendment would extend the agreement term through December 13, 2027, and increase compensation by $322,400, for a revised total not-to-exceed amount of $1,233,920. This amendment would allow the City to maintain uninterrupted sorting operations, support the efficient processing of organic materials, and continue its efforts to reduce contamination and divert organic waste from landfills.

FISCAL IMPACT:

Payments to The Open Door Network will come from the Solid Waste Operations Budget, which is funded by the Refuse Enterprise. There is no impact to the General Fund associated with agreement. In addition, approximately 60 percent of the cost will be reimbursed by Kern County per the City and County Green waste cost sharing agreement.

COUNCIL GOAL:

Community Character & Quality of Life
Innovative and Efficient City Government
ATTACHMENTS:

Amendment
THE OPEN DOOR NETWORK 2023-294 (3) Page 1
Updated – October 2026
AGREEMENT NO. 2023-294 (3)
AMENDMENT NO. 3 TO
AGREEMENT NO. 2023-294
This AMENDMENT NO. 3 TO AGREEMENT NO. 2023-294 is made and entered into on ________________, by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and THE OPEN DOOR NETWORK, a Corporation authorized to do business in California (referred to herein as “CONTRACTOR”). CITY and CONTRACTOR may be referred to individually as a “Party” and collectively as “Parties”.

R E C I T A L S
WHEREAS, on December 13, 2023, CITY and CONTRACTOR entered into Agreement No. 2023-294 for the amount not to exceed $300,000 for a one-year term for recycling and sorting services at the CITY’s Mount Vernon Green Waste Facility; and WHEREAS, on January 8, 2025, CITY and CONTRACTOR amended Agreement No. 2023-294 to increase compensation by an additional $305,760 for a total compensation amount not to exceed $605,760 and to extend the term for one additional year; and WHEREAS, on November 19, 2025, CITY and CONTRACTOR amended Agreement No. 2023-294 to increase compensation by $305,760 for a total compensation amount not to exceed $911,520 and to extend the term for one additional year; and WHEREAS, CITY and CONTRACTOR desire to amend Agreement No. 2023-294 to increase compensation by Three Hundred Thousand Dollars ($322,400) for a total compensation amount not to exceed One Million Two Hundred Thirty-Three Thousand Nine Hundred Twenty Dollars ($1,233,920) and to extend the term of the Agreement to December 13, 2027 to continue recycling and sorting services at the CITY’s Mount Vernon Green Waste Facility.

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree as follows:

1. Section 2 of Agreement No. 2023-294 entitled “COMPENSATION/PAYMENT PROCEDURE” is hereby amended to read as follows:

2. COMPENSATION/PAYMENT PROCEDURE. Subject to the conditions of this section, CITY will pay CONTRACTOR as follows for performing the Scope of Work (“Compensation”):

On an hourly basis in accordance with the hourly rates as shown on Exhibit “A.” In the event that the applicable minimum wage rate under federal, state, or local law increases during the term of this Agreement, the CONTRACTOR’S invoicing rate shall Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 THE OPEN DOOR NETWORK 2023-294 (3) Page 2
Updated – October 2026
automatically increase by an amount equal to the dollar amount of the minimum wage increase.

CITY will pay CONTRACTOR within thirty (30) days after CONTRACTOR submits an itemized invoice for the portions of the Scope of Work completed and that invoice is approved by CITY. The Compensation will be the total amount paid to CONTRACTOR for performing the Scope of Work and includes, but is not limited to, all out-of-pocket costs and taxes. CITY will pay no other compensation to CONTRACTOR. In no case will CITY compensate CONTRACTOR more than One Million Two Hundred Thirty-Three Thousand Nine Hundred Twenty Dollars ($1,233,920) for performing the Scope of Work.

2. Section 3 of Agreement No. 2023-294 entitled “TERM” is hereby amended to read as follows:

3. TERM. Unless terminated sooner as set forth herein, this Agreement shall terminate on December 13, 2027.

3. Except as amended herein, all provisions of Agreement No. 2023-294 shall remain in full force and effect.

IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 3 to Agreement No. 2023-294 to be executed the day and year first above written. “CITY” “CONTRACTOR”

CITY OF BAKERSFIELD THE OPEN DOOR NETWORK
By:____________________________ By: ________________________________ KAREN GOH Print Name: ________________________
Mayor Title: _______________________________
APPROVED AS TO CONTENT:

PUBLIC WORKS DEPARTMENT
By:____________________________

ZACHARY MEYER
Public Works Director
APPROVED AS TO FORM: COUNTERSIGNED:

Chief Assistant City Attorney:_______________________ Finance Director: _____________________ ASHLEY E. ZAMBRANO RANDY MCKEEGAN
Insurance:____________
AEZ/pt
S:\Public Works\Agrs\26-27\Amend 3 to Agr 2023-294_The Open Door Network.docx Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 CEO

LAUREN SKIDMORE

EXHIBIT A
Recycling and Organics Facility Rates – Page 1
Recycling and Organics Facility Sorting Line – 2027 Rates Regular Fee Schedule:

Hourly Rate Per Crew Member – Straight Time: $31.00.

Hourly Rate Per Crew Member – Overtime: $46.50.

Number of Crews: One (1).

Number of Crew Members: Five (5)
Equipment/PPE: Included in hourly rates.

Transportation: Included in hourly rates.

Administration: Included in hourly rates.

Scope of work for fee schedule: The Open Door Network (TODN) will provide a material sorting crew that will provide staffing for up to five (5) crew members and is available for work up to forty (40) hours per week between the hours of 5 a.m. and 4 p.m. Monday through Sunday (excluding holidays when the facility is closed) to sort materials such as metals, glass, wood, paper or plastics, organics materials, and general debris into appropriate containers for recycling or processing. The crew will complete other manual labor duties, such as cleaning, sweeping, and raking debris away from the equipment or from the facility locations, and other manual labor duties as assigned at the City of Bakersfield's Recycling and Organics Facility located at 2601 South Mount Vernon Ave, under the direction of the Facility Supervisor.

TODN will provide personal protective equipment for all crew members, and all crew members will follow all safety and environmental regulations. TODN will perform weekly or bi-weekly safety meetings with the crew members and provide a copy of these safety meetings to the City to file. All crews will abide by the City's rules regarding safety, health, and general code of conduct. If a crew member fails to comply with these standards, TODN will remove the crew member at the request of the Facility Supervisor.

The crew will manually sort through materials for contamination, place collected items in appropriately segregated areas, and perform light labor duties, including end-of-shift clean-up. Crew members will follow the instructions of the Facility Supervisor or Lead, who is knowledgeable about common household hazardous waste and its proper disposal. Crews will be punctual and have dependable attendance.

The crew will perform other duties as assigned and as necessary, consistent with the facility's mission.

Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Recycling and Organics Facility Rates – Page 2
Recycling and Organics Facility Sorting Line – 2027 Rates Crew members can endure long periods of standing, walking, bending, kneeling, carrying, climbing, pushing with arms and legs, lifting 50 pounds, reaching above the shoulder, and balancing. The crew will work in all weather conditions in an outdoor environment exposed to heavy equipment and large truck noises, fumes, and constant vibrations.

Fee Schedule: Five (5) Crew Members:

Hourly Rate Per
Team
Daily Rate Per
Team
Weekly Rate Per
Team
Monthly Rate Per
Team
Annual Do Not
Exceed
Daily Clean Up
Team $155 $1,240 $6,200 $26,866.67 $322,400
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 



 




 
 
 














 




 
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 


 



 






             
         
 





 


Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
X PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
Downtown Street Ambassadors Program, Agreement No. 2020-006 The City of Bakersfield, its mayor, council, officers, agents, employees and volunteers is an Additional Insured with respect to general liability policy if required or agreed to in a written contract subject to all provisions and limitations of the policy per form# PI-GLD-HS (10/01) . The General Liability policy is primary and non-contributory per form CG 01 00 04 13.

City of Bakersfield Risk Management
1600 Truxtun Ave
Bakersfield, CA 93301-5141
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
X PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
Clean City Initiative, Agreement No. 2021-009
City of Bakersfield, it's Mayer, Council, Agents, and Employees are an Additional Insured with respect to the general liability coverage if required or agreed to in a written contract subject to all provisions and limitations of the policy per form# PI-GLD-HS (10/01) . The general liability coverage is primary and non-contributory per form CG 00 01 04 13.

City of Bakersfield
Office of Risk Management
1600 Truxtun Ave
Bakersfield, CA 93309
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
X PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
Encroachment Permits - Regarding 1420 Union Ave in Bakersfield, CA.

The City of Bakersfield, its mayor, council, officers and agents are an Additional Insured with respect to the general liability policy if required or agreed to in a written contract subject to all provisions and limitations of the policy per form# PI-GLD-HS (10/01).

City of Bakersfield
1600 Truxtun Ave
Bakersfield, CA 93301
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
X PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
RE: ESG Monitoring Contract #2017 - 2018
The City of Bakersfield, its mayor, council, officers, agents, employees and volunteers are an Additional Insured with respect to general liability policy if required or agreed to in a written contract subject to all provisions and limitations of the policy per form# PI-GLD-HS (10/01).

City of Bakersfield
Community Development Dept
1600 Truxtun Ave
Bakersfield, CA 93301
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
X PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
Green Waste Facility, Agreement No. 2023-294
The City of Bakersfield, its mayor, council, officers, agents, employees and volunteers are an Additional Insured with respect to general liability policy if required or agreed to in a written contract subject to all provisions and limitations of the policy per form# PI-GLD-HS (10/01).

City of Bakersfield
Solid Waste Division
1600 Truxtun Ave
Bakersfield, CA 93301
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
X PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
The City of Bakersfield, its mayor, council, officers, agents, employees & volunteers are an Additional Insured with respect to the general liability coverage if required or agreed to in a written contract subject to all provisions and limitations of the policy per form# PI-GLD-HS (10/01).

City of Bakersfield
1600 Truxtun Ave Ste 300
Bakersfield, CA 93301
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
Encroachment Permits - Regarding 1420 Union Ave in Bakersfield, CA.

City of Bakersfield
1600 Truxtun Ave
Bakersfield, CA 93301
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
X PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
Located in the common area ground around The Marketplace Bakersfield located at 9000 Ming Ave., Bakersfield, CA 93311.

Regarding Holiday 5K Toy Run/Walk event. The City of Bakersfield, its mayor, council, officers, agents, employees and volunteers are an Additional Insured with respect to general liability coverage if required or agreed to in a written contract subject to all provisions and limitations of the policy per form# PI-GLD-HS (10/01). The general liability is primary and non-contributory per form CG 00 01 04 13.

City of Bakersfield
Treasury Division
1600 Truxtun Ave
Bakersfield, CA 93301
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
X PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
RE: Water Contract
The City of Bakersfield, its mayor, council, officers, agents, employees and volunteers is an Additional Insured with respect to general liability policy if required or agreed to in a written contract subject to all provisions and limitations of the policy per form# PI-GLD-HS (10/01) .

City of Bakersfield
1600 Truxtun Ave., Ste. 300
Bakersfield, CA 93301
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
6/25/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
X PHPK2573552003 7/1/2025 7/1/2026 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552003 7/1/2025 7/1/2026
A 5,000,000
PHUB871349003 7/1/2025 7/1/2026 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
Re: Encroachment Permit at 529 Dolores Street Bakersfield Ca City of Bakersfield, mayor, council, officers, agents, employees and designated volunteers are as an additional insured with respect to the general liability policy if required or agreed to in a written contract subject to all provisions and limitations of the policy per form# PI-GLD-HS (10/11) attached.

City of Bakersfield
1600 Truxtun Ave
Bakersfield, CA 93301
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Please Note:

Umbrella Policy PHUM871349003 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1

Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 :

Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD
PRODUCER CONTACT NAME: PHONE FAX
(A/C, No, Ext): (A/C, No): E-MAIL ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $ DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ PRO- POLICY JECT LOC PRODUCTS - COMP/OP AGG OTHER: $ COMBINED SINGLE LIMIT
(Ea accident) $ ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY (Per accident) $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY (Per accident) $
$ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $
If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
7/1/2026
License # 6011031
(661) 316-5126 (661) 281-4992
18058
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027 100,000
5,000
1,000,000
3,000,000
3,000,000
A 1,000,000
PHPK2573552004 7/1/2026 7/1/2027
A 5,000,000
PHUB871349004 7/1/2026 7/1/2027 5,000,000
10,000
B
NPUWCG00145130231 1/1/2026 1/1/2027 1,000,000
1,000,000
1,000,000
Fiscal year annual monitoring of facility. CDBG Program agreement # 20-055.

City of Bakersfield Economic & Community Development
Tricia Richter
1600 Truxtun Ave #300
Bakersfield, CA 93301
THEOPEN01C HSCHWARTZLER

INSURICA
8500 Stockdale Highway, Suite 200
Bakersfield, CA 93311
Hilary Schwartzler
[email protected]
Philadelphia Indemnity Insurance Company
NonProfits United WC Group
X
X
X
X
X
X
X
X
Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

INSURICA
THEOPEN01C
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
License # 6011031
1 SEE P 1
The Open Door Network
1921 19th St.

Bakersfield, CA 93301
SEE PAGE 1

HSCHWARTZLER
1 Note
Umbrella Policy PHUM871349004 does not extend over Workers Compensation Policy NPUWCG00145130231 Docusign Envelope ID: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Certificate Of Completion
Envelope Id: C6F51D36-96D5-8EA1-8090-8AD539A58FE1 Status: Completed Subject: Complete with Docusign: The Open Door Network 2023-294 (3).pdf Source Envelope:

Document Pages: 40 Signatures: 1 Envelope Originator:

Certificate Pages: 4 Initials: 0 City Clerk's Office
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
[email protected]
IP Address: 174.46.226.5
Record Tracking
Status: Original
11/2/2026 11:10:35 AM
Holder: City Clerk's Office
[email protected]
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Signer Events Signature Timestamp

LAUREN SKIDMORE
[email protected]
CEO
The Open Door Network
Security Level: Email, Account Authentication
(None)
Signature Adoption: Uploaded Signature Image
Using IP Address: 68.233.205.58
Sent: 11/2/2026 11:14:08 AM
Viewed: 11/6/2026 9:00:28 AM
Signed: 11/6/2026 9:02:50 AM
Electronic Record and Signature Disclosure:

Accepted: 11/6/2026 9:00:28 AM
ID: 4eafc142-5dd1-4ebf-97c1-11a59247ceae
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 11/2/2026 11:14:08 AM
Certified Delivered Security Checked 11/6/2026 9:00:28 AM Signing Complete Security Checked 11/6/2026 9:02:50 AM
Completed Security Checked 11/6/2026 9:02:50 AM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure

ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Bakersfield (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system.

Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below.

Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below.

Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us.

All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/28/2022 10:51:05 AM Parties agreed to: LAUREN SKIDMORE
Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us.

How to contact City of Bakersfield:

You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows:

To contact us by email send messages to: [email protected] To advise City of Bakersfield of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at [email protected] and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address.

If you created a DocuSign account, you may update it with your new email address through your account preferences.

To request paper copies from City of Bakersfield
To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to [email protected] and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any.

To withdraw your consent with City of Bakersfield
To inform us that you no longer wish to receive future notices and disclosures in electronic format you may:
i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to [email protected] and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process..

Required hardware and software
The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide-signing-system-requirements.

Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:
 You can access and read this Electronic Record and Signature Disclosure; and  You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and
 Until or unless you notify City of Bakersfield as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Bakersfield during the course of your relationship with City of Bakersfield.

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent – Agreements TO: Honorable Mayor and City Council
FROM: Randy McKeegan
DATE: November 3, 2026
SUBJECT: Amendment No. 4 to Agreement No. 2022-276 with Ennis-Flint Inc. (increase compensation by $140,000; revised not to exceed $810,546.25 and extend the term by one year) to continue the supply of Traffic Paint.

RECOMMENDATION:

Staff recommend approval of amendment.

BACKGROUND:

On December 14, 2022, the City Council approved the annual contract for the supply of traffic paint to Ennis-Flint, Inc., in the amount of $210,546.25; renewable annually thereafter for four consecutive one-year periods. The City may exercise the option to allow contract price adjustments due to increases in the U.S Department of Labor, Producer Price Index for the related industry.

Per the terms of the contract, amendments increasing the contract and/or extending the contract have been approved as follows:
• Amendment 1 approved December 13, 2023; increase of $230,000 for a revised not-to-exceed amount of $440,546.25 and extended the term by one year to December 14, 2024. • Amendment 2 approved November 20,2024; increase of $200,000 for a revised not-to-exceed amount of $640,546.25 and extended the term by one year to December 14, 2025. • Amendment 3 approved November 19, 2025; increase of $30,000 for a revised not-to-exceed amount of $670,546.25 and extended the term by one year to December 14, 2026 Ennis-Flint. Inc. has agreed to extend its bid pricing with a five (5%) increase in the contract price consistent with the increases reflected in the U.S. Department of Labor Producer Price Index Series No.

WPU06210301 for Chemicals and allied products-Special purpose coatings, incl. marine, industrial & construction coatings. Staff have reviewed and approved the requested adjustment, which is permissible pursuant to the terms and conditions of the original bid specifications.

If approved, Amendment No. 4 will increase compensation by $140,000 for a revised not to exceed amount of $810,546.25 and extend the term of the contract by one year. This will allow the City to continue to meet the demand for traffic paint for the City’s pavement marking needs to the term date of December 14, 2027.

FISCAL IMPACT:

Funds are budgeted in the Fiscal Year 2026-27 General Fund for this contract.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

1. Amendment No. 4 to Agreement No. 2022-276

2. EXHIBIT A
________________________________________________
Amendment No. 4 to Agreement 2022-276

Page 1 ends

AGREEMENT NO. 2022-276(4)
AMENDMENT NO. 4 TO
AGREEMENT NO. 2022-276
THIS AMENDMENT NO. 4 TO AGREEMENT NO. 2022-276 is made and entered into on _____________________, by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and ENNIS-FLINT, INC. a Corporation authorized to do business in California (referred to herein as “CONTRACTOR”).

R E C I T A L S
WHEREAS, on December 14, 2022, the CITY and CONTRACTOR entered into Agreement No. 2022-276 in the amount of $210,546.25 for the supply of traffic paint; and
WHEREAS, on December 13, 2023, Council approved Amendment No. 1 to Agreement No. 2022-276 to extend the term of the Agreement by one year and increase compensation by $230,000 for a total compensation not to exceed $440,546.25 to continue the supply of traffic paint; and WHEREAS, on November 20, 2024, Council approved Amendment No. 2 to Agreement No. 2022-276 to extend the term of the Agreement by one year and increase compensation by $200,000 for a total compensation not to exceed $640,546.25 to continue the supply of traffic paint; and WHEREAS, on November 19, 2025, Council approved Amendment No. 3 to Agreement No. 2022-276 to extend the term of the Agreement by one year and increase compensation by $30,000 for a total compensation not to exceed $670,546.25 to continue the supply of traffic paint; and WHEREAS, the parties desire to enter into Amendment No. 4 to Agreement No. 2022-276 to extend the term of the agreement by one year and increase compensation by $140,000 for a total compensation not to exceed $810,546.25 to continue the supply of traffic paint; and
WHEREAS, the original specifications and Agreement No. 2022-276 provide for an adjustment to the contract prices based on increases in the U.S.

Department of Labor Producer Price Index (PPI); and
________________________________________________
Amendment No. 4 to Agreement 2022-276

Page 2 ends

WHEREAS, in accordance with the terms and conditions of the original bid specifications, CONTRACTOR has requested an adjustment to the contract price based on the current applicable PPI, subject to the CITY’S review and approval; and
WHEREAS, in accordance with the terms and conditions of the original bid specifications, the parties have determined that a five percent (5%) increase in the contract price is applicable based on the increases reported by the U.S Department of Labor Producer Price Index, Series no. WPU06210301 for Chemicals and allied products-Special purpose coatings, incl. marine, industrial & construction coatings, which increase is included in and accounted for within the $140,000 increase.

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree as follows:

1. Section 2 of Agreement No. 2022-276 entitled “COMPENSATION” is hereby amended to read as follows:

2. COMPENSATION/PAYMENT PROCEDURE. Subject to the
conditions of this section, CITY will pay CONTRACTOR as follows for performing the Scope of Works (“Compensation”):

A total, aggregate payment NOT TO EXCEED EIGHT HUNDRED

TEN THOUSAND FIVE HUNDRED FOURTY-SIX DOLLARS AND
TWENTY-FIVE CENTS ($810,546.25) based on a quantity/unit of measure basis in accordance with the bid documents.

CITY will pay CONTRACTOR within 30 days after CONTRACTOR submits an itemized invoice for the portions of the Scope of Work completed and that invoice is approved by CITY. The compensation will be the total amount paid to CONTRACTOR for performing the Scope of Work and included, but is not limited to, all out-of-pocket costs and taxes. CITY will pay no other compensation to CONTRACTOR. In no case with CITY
compensate CONTRACTOR more than EIGHT HUNDRED TEN
THOUSAND FIVE HUNDRED FOURTY-SIX DOLLARS AND TWENTY-FIVE CENTS ($810,546.25)

2. Section 3 of Agreement No. 2022-276 entitled “TERM” is hereby amended to read as follows:

3. TERM. Unless terminated sooner, as set forth herein, this Agreement shall terminate on December 13, 2027.

ITEM DESCRIPTION QTY UOM
UNIT
PRICE
5%

INCREASE
1 Traffic Paint, White Rapid Dry in 250-
Gallon Totes 6,000 GAL 12.50 0.63
2 Traffic Paint, Yellow Rapid Dry in 250-
Gallon Totes 5,500 GAL 13.00 0.65
3 Traffic Paint, White Rapid Dry in 5-Gallon
Pails 2,000 GAL 13.50 0.68
4 Traffic Paint, Yellow Rapid Dry in 5-Gallons
Pails 1,500 GAL 14.00 0.70
5% increase approved
by Purchasing
(5th year term)
Effective
12-14-26 to12-13-27
Original Bid Price Price Adjustment
Ennis-Flint
Greensboro, NC

EXHIBIT A
Annual Contract for Traffic Paint - Rate Sheet
Bid No. 22-23-37
NEW
UNIT
PRICE

13.13 13.65

14.18 14.70

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Randy McKeegan
DATE: November 3, 2026
SUBJECT: Amendment No. 3 to Agreement No. 2024-245 with Kern Sprinkler Landscaping, Inc. (increase compensation by $400,000; revised not to exceed amount of $2,238,174.98) to continue the supply of On-Call Irrigation & Landscaping Service.

RECOMMENDATION:

Staff recommend approval of the amendment.

BACKGROUND:

On September 11, 2024, the City Council approved the annual contract for the supply of On-Call Irrigation & Landscaping Service to Kern Sprinkler Landscaping, in the amount of $1,418,174.98; renewable annually thereafter for four consecutive one-year periods.

This on-call as-needed contract provides routine irrigation & landscape maintenance and anticipated capital projects to be completed by the Recreation and Parks Department, Water Resources Department, and divisions within the Public Works Department. Currently, the Water Department is facilitating the removal of all non-functional turf from well sites and its replacement with decorative gravel. This on-going work has significantly increased contract service levels. An increase to the compensation will allow the Water Resources Department to continue and complete this work as needed.

Per the terms of the contract, amendments extending and/or increasing the compensation for the contract have been approved as follows:
• Amendment 1 approved August 27, 2025; extended the term by one year to September 10, 2026. • Amendment 2 approved August 26, 2026; increased compensation by $420,000 for revised not-to-exceed amount of $1,838,174.98 and extended the term by one year to September 10 ,2027.

FISCAL IMPACT:

If approved, Amendment No. 3 will increase compensation by $400,000 for a revised not to exceed amount of $2,238,174.98 to allow the continuance of the supply of On-Call Irrigation & Landscaping Service. Several departments utilize these contracted services, however Water Department has enterprise funds and the majority of this contract increases will be funded from the Water Dept.

Enterprise funds and less General Funds.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

Amendment No. 3 to Agreement No. 2024-245

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Daniel Maldonado, Water Director
DATE: October 23, 2026
SUBJECT: Amendment No. 1 to Agreement No. 2025-093 with Witcher Electric Inc. (to increase compensation by $1,000,000; revised not to exceed $2,500,000) to provide Electrical Services for the Water Department.

RECOMMENDATION:

Staff recommends approval of the amendment.

BACKGROUND:

The Water Department is responsible for the City’s Domestic Water system and the Kern River System, including several canals. Periodically, the Department requires electrical services, either planned or under emergency conditions, to maintain and improve these systems. Typical services include installation, repair, modification, and/or replacement of electrical equipment related to water system infrastructure.

Such equipment and work may include generators, variable frequency drives, electrical control systems, power delivery systems, and other general electrical work.

On June 11th, 2025, City entered into Agreement 2025-093 with Witcher Electric Inc. to provide electrical services for the Water Department.

Amendment No. 1 will increase the not-to-exceed compensation amount by $1,000,000 to $2,500,000.

The additional $1,000,000 will be used to fund on-going planned and unplanned emergency electrical work as well as replacing an aged-out emergency generator with a newer generator with specifications that will be in compliance with the San Joaquin Valley Air Pollution Control District’s updated requirements. The additional $1,000,000 has been programmed into the Department’s 5-year Financial Plan and funding is captured in the approved water rates.

FISCAL IMPACT:

Sufficient funds are available in the Water Department’s Operations and Capital Improvement Budgets; therefor, there is no General Fund impact associated with this agreement.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

Amendment No. 1 to Agreement 2025-093

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreement TO: Honorable Mayor and City Council
FROM: Daniel R. Maldonado, Water Director
DATE: November 3, 2026
SUBJECT: Amendment No. 1 to Agreement No. 2023-274 with South Coast Automation System (extend the term by one year) to provide On-Call SCADA System Maintenance and Support Services for the Wastewater Division.

RECOMMENDATION:

Staff recommend approval of amendment.

BACKGROUND:

The Wastewater Division requires routine hardware and software maintenance and support services for its Supervisory Control and Data Acquisition (SCADA) systems. The services provided through the on-call SCADA system maintenance and support services agreement are an important part of ensuring that the plants operate efficiently, capture the necessary data to remain in compliance with wastewater discharge requirements, and meet the needs of sewer customers.

On November 29, 2023, the City entered into Agreement No. 2023-274 with South Coast Automation Systems, Inc. (South Coast) to provide on-call SCADA system maintenance and support services for the Wastewater Division. South Coast was selected through a formal Request for Qualifications process and awarded an initial three-year agreement. Since the agreement's execution, South Coast has provided various SCADA system maintenance, upgrades, and technical support services at Wastewater Treatment Plants No. 2 and No. 3, including implementing a Win-911 alarm notification system at both plants, upgrading the iFIX software and associated servers at Wastewater Treatment Plant No. 2, configuring Meraki firewalls to enable secure remote access through a virtual private network, rebuilding the historian server at Wastewater Treatment Plant No. 2, and providing ongoing technical assistance to plant personnel.

At this time, due to the continued need for on-call SCADA system maintenance and support services to support proper facility operations, staff recommend extending the term by one year. This adjustment is in accordance with the original Agreement and will allow the Wastewater Division to continue addressing routine on-call services without interruption to service.

FISCAL IMPACT:

Sufficient funds are budgeted in the Sewer Enterprise Fund for this amendment, therefore, there is no impact to the City General Fund associated with this amendment.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

1. Amendment No. 1

2. Exhibit B
Amendment No. 1 to Agreement No. 2023-274 – South Coast Automation System Inc. Page 1 Updated – October 2026
AGREEMENT NO. 2023-274 (1)
AMENDMENT NO. 1 TO
AGREEMENT NO. 2023-274
This AMENDMENT NO. 1 TO AGREEMENT NO. 2023-274 is made and entered into on ________________, by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and SOUTH COAST AUTOMATION SYSTEM, INC., a corporation authorized to do business in California (referred to herein as “CONTRACTOR”). CITY and CONTRACTOR may be referred to individually as a “Party” and collectively as “Parties”.

R E C I T A L S
WHEREAS, CITY and CONTRACTOR entered into Agreement No. 2023-274 on November 29, 2023 for Supervisory Control and Data Acquisition (SCADA) system maintenance and support services ; and
WHEREAS, the parties desire to amend Agreement No. 2023-274 to replace the attached compensation rate sheet with an updated rate sheet and to extend the term to November 30, 2027.

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree as follows:

1. Section 2 of Agreement No. 2023-274 entitled
“COMPENSATION/PAYMENT PROCEDURE” is hereby amended to read as follows:

2. COMPENSATION/PAYMENT PROCEDURE. Subject to the
conditions of this section, CITY will pay CONTRACTOR as follows for performing the Scope of Work (“Compensation”):

On an hourly basis at the rates specified in the updated rate sheet dated October 26 2026, attached hereto as Exhibit B and incorporated herein by reference, in an amount not to exceed TWO HUNDRED THOUSAND DOLLARS ($200,000).

CITY will pay CONTRACTOR within thirty (30) days after
CONTRACTOR submits an itemized invoice for the portions of the Scope of Work completed and that invoice is approved by CITY. The Compensation will be the total amount paid to CONTRACTOR for performing the Scope of Work and
Amendment No. 1 to Agreement No. 2023-274 – South Coast Automation System Inc. Page 2 Updated – October 2026
includes, but is not limited to, all out-of-pocket costs and taxes. CITY will pay no other compensation to CONTRACTOR.

In no case will CITY compensate CONTRACTOR more than
$200,000 for performing the Scope of Work.

2. Section 3 of Agreement No. 2023-274 entitled “TERM” is hereby amended to read as follows:

3. TERM. Unless terminated sooner, as set forth herein, this Agreement shall terminate on November 30, 2027.

3. Except as amended herein, all provisions of Agreement No. 2023- 274 shall remain in full force and effect.

IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to Agreement No. 2023-274 to be executed the day and year first above written.
“CITY” “CONTRACTOR”

CITY OF BAKERSFIELD SOUTH COAST AUTOMATION SYSTEM,
INC.

By: ____________________________ By: ________________________________ KAREN GOH Print Name: ________________________
Mayor Title: _______________________________
APPROVED AS TO CONTENT:

WATER DEPARTMENT
By: ____________________________
DANIEL R. MALDONADO
Water Director
APPROVED AS TO FORM: COUNTERSIGNED:

Deputy City Attorney: _______________________ Finance Director: _____________________

MATTHEW COLLOM RANDY MCKEEGAN
Insurance: ____________
MSC/pt
S:\WATER\Agrs\26-27\AmendmentToAgreement 2023-274 Draft - MSC Edits.doc Matt Barone President

SOUTH COAST AUTOMATION SYSTEMS, INC
238 W Chapman Ave, Suite 201 • Orange, CA 92866
Phone: (714) 874-4728

CONFIDENTIAL
The information contained in this document is proprietary to South Coast Automation Systems, Inc. (SCAS) and is intended for the exclusive use of the parties to whom it has been delivered. The document or the information contained herein is not to be delivered in any form to third parties without prior written authorization from SCAS.

CONTROL SYSTEMS INTEGRATION SERVICES FEE SCHEDULE
Senior Engineer…………......$236/Hour
Project Engineer………………$208/Hour
This schedule supersedes all previous fee schedules and will be in effect for work quoted after January 1, 2026; unless, and until superseded by subsequent rate adjustments. 10/26/26

STANDARD COMMERCIAL TERMS AND CONDITIONS
FIXED FEE CONTRACTS:

For fixed fee contracts for engineering services work, the client will be billed periodically based upon demonstrable completion of the work on the project against the scope of work for the project. The amount and frequency of these periodic billings are set by mutual agreement between the SCAS and the Client authorized representative at the time of the issuance on the order to proceed with the work.

TIME AND MATERIAL CONTRACTS:

For time and material contracts, billings for services will be generated either monthly or semi-monthly dependent upon the level of effort being expended on the project. SCAS semi-monthly accounting intervals end on the 15th and the last day of each month.

EQUIPMENT:

When equipment is provided for the client, SCAS will generate an invoice to the client upon initial purchase order to the equipment supplier. SCAS applies a 20% material handling charge to all purchased equipment. Shipping and handling charges from the supplier/distributor are invoiced at cost. SCAS maintains adequate premises insurance to cover damage to equipment while in SCAS custody.

MINIMUM SERVICE CALL:

SCAS will respond as quickly as possible to all client requests for technical support. If a field service call is required, SCAS will apply the typical 4-hour minimum service charge plus Travel Time and Expenses as identified below.

TRAVEL TIME, MILEAGE, AND EXPENSES:

Travel time is invoiced for all Out-of-Office engagements (meetings, start-ups, service calls, etc.). Travel time is calculated door-to-door and is invoiced at the rates as defined in the current SCAS rate schedule.

SCAS invoices mileage according to the IRS business mileage travel rate. All travel, transportation, and field expenses are billed to the client at cost.

PAYMENT TERMS:

All invoices are due and payable within 30 days of the date of the invoice. Past due invoices will be assessed with a finance charge of 1.5% per month. If invoices remain unpaid for 45 days, SCAS will notify the client that work on the project has been suspended until the account is brought current.

WARRANTY:

Programs written by SCAS are covered for one year from acceptance, for any programming errors which are demonstrable and repeatable. Any warranty consideration will be based on the system accepted at the time of completion. Any failures resulting from tampering or modification by others will void the warranty unless prior written permission is given. During the warranty period repair work will only be performed if the client’s account is current.

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent – Agreements TO: Honorable Mayor and City Council
FROM: Randy McKeegan
DATE: November 3, 2026
SUBJECT: Amendment No. 1 to Agreement No. 2025-241 with Silvas Oil Company, Inc. (increasing by $1,530,000; revised not to exceed amount of $3,030,000 and extending the term by one year) to continue the supply of gasoline and diesel fuels, bobtail/partial loads.

RECOMMENDATION:

Staff recommend approval of the amendment.

BACKGROUND:

On December 13, 2023, the City Council approved the annual contract for the supply of gasoline and diesel fuels, bobtail/partial loads only with Silvas Oil Company, Inc., in the amount of $1,500,000; renewable annually thereafter for four (4) consecutive one-year periods upon mutually agreeable terms. The agreement was mutually extended by the parties over the following years; however, it inadvertently expired on December 12, 2025. To avoid any interruption in services, the City Council approved Agreement No. 2025-214 with Silvas Oil Company, Inc., on December 17, 2025, with services effective as of December 13, 2025. The new agreement was entered into under the City’s existing properly procured agreement allowing the services to continue as though the prior agreement had not expired. This provided for uninterrupted supply of gasoline and diesel fuels, bobtail/partial loads to the city. The City may exercise the option to allow contract price adjustments due to increases in the U.S. Department of Labor Producer Price Index for the related industry.

Silvas Oil Company has agreed to extend its bid pricing with an 8.76% increase in the contract price consistent with the increases reflected in the U.S. Department of Labor Producer Price Index Series no.

PCU4842 for specialized freight trucking. Staff have reviewed and approved the requested adjustment, which is permissible pursuant to the terms and conditions of the original bid specifications.

If approved, Amendment No. 1 to Agreement No. 2025-241 will increase the contract by $1,530,000 for a revised not-to-exceed amount of $3,030,000 allowing the continuance of the supply of gasoline and diesel fuels, bobtail/partial loads services.

FISCAL IMPACT:

Funds are budgeted in the Equipment Management Fund for this contract.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

1. Amendment No. 1 to Agreement No. 2025-241

2. Exhibit A

EXHIBIT A Original Bid Price

ANNUAL CONTRACT FOR FUEL-BOBTAIL/PARTIAL LOADS
BID NO. 23-24-42
DIFFERENTIAL PRICING - Rate Sheet

PRODUCT DESCRIPTION
Annual Estimate
Differential - OPIS
Bobtail 1-2500 Gals

8.76%
increase
New
Differential - OPIS
Bobtail 1-2500 GALS
UNLEADED 87 26,000 +.0325 +0.002847 +.0353
UNLEADED 89 130,000 +.0325 +0.002847 +.0353
DIESEL, CLEAR 189,800 +.0325 +0.002847 +.0353
DIESEL, RED 4,000 +.0325 +0.002847 +.0353
Standby and Emergency Deliveries per Quarter Hour $20.00 $1.75 $21.75 Price Adjustment

8.76% Increase Approved by
Purchasing (4th year term)
Effective
12-13-2026 to 12-12-2027
Silvas Oil Company,
Inc
Fresno, CA

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Phillip Burns, Development Services Director
DATE: November 2, 2026
SUBJECT: Amendment No. 5 to Agreement No. 2021-242 with Rincon Consultants, Inc. (extend term to December 31, 2028) related to the General Plan Update.

RECOMMENDATION:

Staff recommends approval of the amendment.

BACKGROUND:

On October 20, 2021, the City entered into Agreement No. 2021-242 with Rincon Consultants, Inc. for professional services related to the General Plan Update, with a not-to-exceed amount of $2,766,189.00. Since that time, four amendments have been executed.

Amendment No. 1, approved on November 2, 2022, expanded the Scope of Work to include a zoning ordinance update and increased compensation by $296,798.00, bringing the total to $3,062,987.00.

Amendment No. 2, approved on August 9, 2023, decreased compensation by $24,428.00, adjusting the total to $3,038,559.00. Amendment No. 3, approved on March 26, 2025, extended the contract term through December 31, 2026, to allow sufficient time to complete the General Plan Update.

Amendment No. 4, approved October 22, 2025, expanded the Scope of Work and increased compensation by $290,691.00, bringing the total to $3,329,250.00.

The proposed Amendment No. 5 is proposed to extend the amended term, set to expire on December 31, 2026. Rincon requests and extension through December 31, 2028, to complete the General Plan Update as planned. All other provisions of Agreement No. 2021-242 remain unchanged.

FISCAL IMPACT:

The action to approve the amended agreement is budgeted by the department in the Fiscal Year General Plan Maintenance Trust fund; therefore, will not draw on any General Funds for this contracted services.

COUNCIL GOAL:

Community Character & Quality of Life
Reliable Infrastructure
Economic Opportunity for All
Safety and Resilience
ATTACHMENTS:

Amendment No. 5 to Agreement No. 2021-242
S:\SHARED\08_Planner Folders\06_Business Manager_Support Staff PLACEHOLDER\Secretary\Ana\Agreements\Rincon Consultants Inc\General Plan\Amendment No 5 to Agreement No 2021-242.doc AGREEMENT NO. 2021-242 (5)
AMENDMENT NO. 5 TO
AGREEMENT NO. 2021-242
This AMENDMENT NO. 5 TO AGREEMENT NO. 2021-242 is made and entered into on , by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and RINCON CONSULTANTS, INC. a Corporation; authorized to do business in California (referred to herein as “CONTRACTOR”).

R E C I T A L S
WHEREAS, on October 20, 2021, CITY and CONTRACTOR entered into Agreement No. 2021-242, wherein CONTRACTOR agreed to perform the tasks outlined therein preparation of the General Plan Update, for a total not to exceed the amount of $2,766,189.00; and
WHEREAS, on November 2, 2022, CITY and CONTRACTOR entered into Amendment No. 1 to Agreement No. 2021-242, to expand the Scope of Work and increase compensation by $296,798.00 for purposes of completing a zoning ordinance update to accompany the General Plan Update, for a new not to exceed the amount of $3,062,987.00; and
WHEREAS, on August 9, 2023, CITY and CONTRACTOR entered into Amendment No. 2 to Agreement No. 2021-242, to decrease the total compensation by $24,428.00 for a revised amount not to exceed of $3,038,559.00; and
WHEREAS, on March 26, 2025, CITY and CONTRACTOR entered into Amendment No. 3 to Agreement No. 2021-242, to extend the term of the Agreement to December 31, 2026 in order to complete the General Plan Update; and
WHEREAS, on October 22, 2025, CITY and CONTRACTOR entered into Amendment No. 4 to Agreement No. 2021-242, to expand the Scope of Work and increase compensation by $290,691.00 for a revised amount not to exceed of $3,329,250.00; and
WHEREAS, CITY and CONTRACTOR would like to extend the term of the Agreement by 24 months in order to complete the General Plan Update.

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree as follows:

Docusign Envelope ID: 4CE58EB0-3012-8623-82E6-77C840A31AB1 S:\SHARED\08_Planner Folders\06_Business Manager_Support Staff PLACEHOLDER\Secretary\Ana\Agreements\Rincon Consultants Inc\General Plan\Amendment No 5 to Agreement No 2021-242.doc

1. Section 3 of Agreement No. 2021-242 entitled “TERM” is hereby amended to read as follows:

3. TERM. Unless terminated sooner, as set forth herein, this Agreement shall terminate on December 31, 2028.

2. Except as amended herein, all provisions of Agreement No. 2021- 242 shall remain in full force and effect.

IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 5 to Agreement No. 2021-242 to be executed the day and year first above written.
“CITY” “CONTRACTOR”
CITY OF BAKERSFIELD RINCON CONSULTANTS, INC.

By:____________________________ By:_________________________________

KAREN GOH
Mayor Print Name: ____________________________________
Title:_______________________________
APPROVED AS TO CONTENT:

DEVELOPMENT SERVICES DEPARTMENT
By:_______________________________

PHILLIP BURNS
Development Services Director
APPROVED AS TO FORM: COUNTERSIGNED:

Deputy City Attorney:____________________________ Finance Director: _____________________

VIRIDIANA GALLARDO-KING RANDY MCKEEGAN
Insurance:____________
Docusign Envelope ID: 4CE58EB0-3012-8623-82E6-77C840A31AB1 Kimiko Lizardi
Senior Principal

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Bids TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 6, 2026
SUBJECT: Extend bid from Jim Burke Ford for the purchase of 35 four-door police Ford Interceptor Utility vehicles for the Police Department in the amount of $1,759,619.10 ($50,274.83 per unit).

RECOMMENDATION:

Staff recommend extension of bid and approval of the purchase.

BACKGROUND:

On February 25, 2026, Council accepted the bid from Jim Burke Ford for the purchase of 29 four-door police Ford Interceptor Utility vehicles for the Police Department. The specifications included a provision whereby, with the written approval of both the bidder and the City, the City may purchase additional units at the same per unit cost for a period of 12 months after acceptance of bid. Jim Burke Ford has agreed to extend their per unit bid price of $50,274.83 for 35 additional units.

This purchase of thirty-five (35) four-door police Ford Interceptor Utility vehicles will replace units that are more than seven years old and meet the criteria for replacement as determined by the Fleet Division.

The units will be replaced with newer units providing improved performance and efficiency.

Staff recommend extension of bid for the purchase of thirty-five (35) four-door police Ford Interceptor Utility vehicles from Jim Burke Ford in Bakersfield, CA for an overall purchase amount of $1,759,619.10 ($50,274.83 per unit).

FISCAL IMPACT:

Funds in the amount of $1,724,000 have been budgeted in the Fiscal Year 2026-27 FY Equipment Fund for this purchase. Staff will use pre-approved contingency funds to cover the shortfall of $35,619.05.

COUNCIL GOAL:

Innovative and Efficient City Government
Safety and Resilience
ATTACHMENTS:

N/A

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Bids TO: Honorable Mayor and City Council
FROM: Daniel R. Maldonado, Water Director
DATE: November 3, 2026
SUBJECT: Wastewater Treatment Plants No. 2 and 3 Septage Receiving Station Improvements Accept bid and approve contract with GSE Construction Company Inc. ($1,107,007) for the Septage Receiving Station Improvement Project.

RECOMMENDATION:

Staff recommend acceptance of low bid and approval of contract.

BACKGROUND:

The Wastewater Division operates four septage receiving stations, with two septage receiving stations at Wastewater Treatment Plant No. 2 (WWTP2) and two septage receiving stations at Wastewater Treatment Plant No. 3 (WWTP3). These stations receive septage from permitted haulers and are equipped with processing units that remove rocks, gravel, rags, and coarse solids from the septage, which reduces the potential for damage to downstream equipment.

In Fiscal Year 2024-25, City completed construction of Project E3K304, which upgraded one of the septage receiving stations at WWTP3. The upgraded station has demonstrated consistent performance and confirmed the effectiveness of the new technology in meeting the operational requirements of the Wastewater Division.

At this time, both septage receiving stations at WWTP2 and one of the septage receiving stations at WWTP3 are nonfunctional and damaged beyond repair. With only one operational station in service, the Wastewater Division is unable to reliably accommodate the septage deliveries.

The work to be performed consists, in general, of replacing the two existing septage receiving units, including piping and valves at WWTP 2 and one existing septage receiving unit, including piping and valves at WWTP 3. The work also includes the installation of electrical and instrumentation equipment. Septage receiving units shall be provided by the City of Bakersfield.

The Engineer’s Estimate for this construction contract was $1,903,200. On October 29, 2026, five bids were received. The acceptable bids are as follows:

GSE Construction Company Inc. in the amount of $1,107,007.00 7633 Southfront Road, Suite 160
Livermore, CA 94551
Syblon Reid in the amount of $1,251,000.00
1130 Sibley Street
Folsom, CA 95630
Eclipse Construction Services, Inc. in the amount of $1,367,000.00 5401 Woodmere Drive
Bakersfield, CA 93313
HPS Mechanical, Inc. in the amount of $1,390,000.00
3100 E Belle Terrace
Bakersfield, CA 93307
Metro Builders & Engineering Group, Ltd in the amount of $1,750,570.00 2610 Avon Street, Suite A
Newport Beach, CA 92663
Staff recommend acceptance of the bids and approval of the construction contract to the lowest responsive and responsible bidder, GSE Construction Company Inc.

FISCAL IMPACT:

Sufficient funds are budgeted in the Sewer Enterprise Fund capital improvement program for this agreement. Therefore, there is no impact to the General Fund with award of this agreement.

COUNCIL GOAL:

Reliable Infrastructure
ATTACHMENTS:

Agreement

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Miscellaneous TO: Honorable Mayor and City Council
FROM: Christian Clegg, City Manager
DATE: October 27, 2026
SUBJECT: Appropriate $80,000 in Transient Occupancy Taxes (TOT) fund balance to the Transient Occupancy Taxes Capital Improvement Budget RECOMMENDATION:

Staff recommends approval of the appropriation.

BACKGROUND:

The Dignity Health Arena is a cornerstone of the Downtown Bakersfield area, hosting premier global artists and events. To elevate the live event experience, this project introduces the procurement, installation and ongoing maintenance of state-of-the-art Vizrt Tricaster Vizion Tower equipment.

Under Agreement No. CM26-044, VMI Inc. will deliver a comprehensive, turnkey integration of the new system. Their scope of work includes equipment procurement and full-scale installation; system design, project management, and scheduling; rigorous testing, verification and operational set-up; and staff training to ensure seamless functionality.

This initiative is funded by the Transient Occupancy Tax (TOT). Staff recommends the appropriation of TOT funds to the Community Facilities Capital Improvement budget to facilitate invoice processing and successful project completion.

FISCAL IMPACT:

There is no impact to the general fund. The project would be funded with Transient Occupancy Tax (TOT) fund balance.

COUNCIL GOAL:

Community Character & Quality of Life
Reliable Infrastructure
Innovative and Efficient City Government

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Miscellaneous TO: Honorable Mayor and City Council
FROM: Phillip Burns, Development Services Director
DATE: November 6, 2026
SUBJECT: Appropriate $1,864,710 in Community Development Block Grant (CDBG) funds to the HUD CDBG Entitlement Fund Development Services Operating Budget RECOMMENDATION:

Staff recommends approval of the appropriation.

BACKGROUND:

The City of Bakersfield is an entitlement jurisdiction, and a recipient of funds from the United States Department of Housing and Urban Development (HUD) under Title I of the Housing and Community Development Act of 1974.

CDBG funds are provided annually by HUD, as authorized by Congress. The City’s Community Development Division administers these grant funds for eligible activities as defined in 24 C.F.R. Part 570, Subpart I, and in accordance with the Consolidated Plan and Annual Action Plan.

At the end of each fiscal year, staff perform a calculation of unexpended CDBG funds, referred to as “contingency.” Those contingency funds are then reallocated to currently approved projects that require additional funding. Due to recent changes in the City’s financial management system, there were delays in creating a new Standard Operating Procedure (SOP) for calculating the annual contingency funds. This resulted in an accumulation of unexpended administrative and project funds.

On April 22, 2026, City Council approved the Fiscal Year 2026-20267 Action Plan. Once funds are appropriated to the budget, these savings will be allocated to the approved project list identified in the Action Plan.

FISCAL IMPACT:

There is no impact to the City’s general fund. Entitlement CDBG grant funds will be allocated to current Action Plan projects.

COUNCIL GOAL:

Community Character & Quality of Life
ATTACHMENTS: None

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent – PSVS TO: Honorable Mayor and City Council
FROM: Phillip Burns, Development Services Director
DATE: October 6, 2026
SUBJECT: Amendment No. 1 to Agreement No. 2025-082 with St. Vincent De Paul (extend term to June 30, 2027) to allow additional time for completion of the expansion and remodel project at 316 Baker Street (Ward 2)
RECOMMENDATION:

Staff recommends approval of the amendment.

BACKGROUND:

On May 28, 2025, the City of Bakersfield and St. Vincent de Paul entered into Agreement No. 2025-082 to expand and remodel the kitchen and restroom facilities at the St. Vincent de Paul Homeless Center, located at 316 Baker Street. The project includes upgrades to four existing restrooms and two showers to create nine combined restroom and shower units. The project also expands the existing cooking and serving areas, upgrades the commercial oven and dishwasher, increases refrigeration and freezer capacity, installs a non-bearing wall and energy-efficient lighting, and replaces two aging HVAC units that require frequent repairs.

The purpose of the project is to enhance the capacity, accessibility, and efficiency of the St. Vincent de Paul Homeless Center to better meet the needs of individuals experiencing homelessness in Bakersfield.

During a project walkthrough with City staff, additional Americans with Disabilities Act (ADA) accessibility improvements were identified that were not anticipated in the original project scope.

Additional time is necessary to incorporate and complete these required improvements.

The amendment before Council extends the term of Agreement No. 2025-082 from December 31, 2026, to June 30, 2027, to provide sufficient time to complete the required ADA improvements and the remaining project work. All other terms and conditions of the Agreement remain unchanged.

FISCAL IMPACT:

The approval of the amended agreement for the project was budgeted with the department’s Fiscal Year 2024-25 Public Safety and Vital Services funds and has been carried forward. This amendment only allows for additional time to complete the project and doesn’t add any additional funds.

COUNCIL GOAL:

Safety and Resilience
Reliable Infrastructure
Economic Opportunity for All
ATTACHMENT:

Amendment
________________________________________________________ AMENDMENT No. 1 to AGREEMENT No. 2025-082 Page 1
AGREEMENT NO. 2025-082(1)
AMENDMENT NO. 1 TO
AGREEMENT NO. 2025-082
This AMENDMENT NO. 1 TO AGREEMENT NO. 2025-082 is made and entered into on _______________________, by and between the CITY OF BAKERSFIELD, a municipal corporation, ("CITY" herein) and ST. VINCENT DE PAUL, a California Non-Profit Public Benefit Corporation authorized to do business in California ("CORPORATION" herein). CITY and CORPORATION are collectively referred to herein as “Parties” and individually as a “Party”.

R E C I T A L S
WHEREAS, on May 28, 2025, CITY and CORPORATION entered into Agreement No. 2025-082 to provide Fiscal Year 2024-2025 Public Safety and Vital Services (PSVS) funds to assist CORPORATION with the expansion and remodeling of the facilities (“Project”) located at 316 Baker Street, Bakersfield, California 93301, to accommodate the growing homeless population; and
WHEREAS, completion of the Project was delayed due to additional Americans with Disabilities Act (ADA) compliance updates, which required code clearance before the original plans could proceed; and
WHEREAS, CITY and CORPORATION desire to amend Agreement No. 2025-082 to extend the term from December 31, 2026, to June 30, 2027, to allow CORPORATION additional time to complete Project.

NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CORPORATION mutually agree as follows:

1. Section 9 of Agreement No. 2025-082 entitled “Term” is hereby amended to read as follows:

9. TERM. Unless terminated sooner, as set forth herein, this Agreement shall terminate on June 30, 2027.
///
///
Docusign Envelope ID: A3898AFE-8696-85B5-8166-F39D9F05D276 ________________________________________________________ AMENDMENT No. 1 to AGREEMENT No. 2025-082 Page 2

2. Except as amended herein, all other provisions of Agreement No. 2025-082 shall remain in full force and effect.

IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to Agreement No. 2025-082 to be executed on the day, and year first above written.
"CITY" "CORPORATION"
CITY OF BAKERSFIELD ST. VINCENT DE PAUL
By: _________________________ By: _________________________

KAREN GOH DARRYL EBEL
Mayor President
APPROVED AS TO CONTENT:

DEVELOPMENT SERVICES DEPARTMENT
By:_______________________________

PHILLIP BURNS
Director
APPROVED AS TO FORM: COUNTERSIGNED:

City Attorney: _______________________________ Finance Director: _______________________________

VIRGINIA GENNARO RANDY MCKEEGAN
Insurance:____________
Docusign Envelope ID: A3898AFE-8696-85B5-8166-F39D9F05D276

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent Calendar Public Hearings TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 6, 2026
SUBJECT: Public Hearing to Consider Resolution adopting updated fees pursuant to the cost recovery system and approving the Master Fee Schedule.

RECOMMENDATION:

Staff recommends adoption of the resolution.

BACKGROUND:

State law requires new fees, charges, and increases in existing fees and charges to be adopted by ordinance or resolution following a public hearing on said fees and charges. Chapter 3.70 of the Bakersfield Municipal Code (BMC) authorizes the establishment and increase of fees and charges by resolution for the City. In accordance with Chapter 3.70 of the BMC, the adoption of new and increased fees and charges is necessary for the City to recover the reasonable estimated cost of providing the services for which the fees are charged.

City staff completed a full review of the master fee schedule in May 2021. Supplementary updates of fees and language to the last fee schedule were approved in April 2023, April 2024, and April 2025 based on increases to the Consumer Price Index (CPI) those respective years.

In April 2026, each department completed a full review of fees that included a thorough examination of the related time spent and materials used by staff. The majority of the fees increased based on changes in the consumer price index for the Los Angeles, Long Beach, & Anaheim region, which resulted in increases between 3% and 4%.

Subsequent to the standard update to the fee schedule, on June 10, 2026 the City Council approved a change to the Municipal Code (Chapter 17.74) that would allow for the operation of Short-Term Rentals (STRs) within the City limits. The Development Services and Finance Departments have established an STR implementation plan that would require a permit process and inspection for local STR operators and a monitoring and revenue collection system. These fees have been established to cover the cost of these new services and the overall oversight of short-term rentals in the City of Bakersfield.

Section A-16 has been added to the master fee schedule establishing an inspection fee (A-16-1), a renewal fee (A-16-2) and a reinspection fee (A-16-3).

FISCAL IMPACT:

Approval of the resolution and the Master Fee Schedule will allow the departments that provide services for the city to recover costs for those various services. Significant Impact to the General Fund if the Fee Schedule is not updated to recover the costs.

COUNCIL GOAL:

Innovative and Efficient City Government
ATTACHMENTS:

1. Resolution

2. Master Fee Schedule
RESOLUTION NO. .

A RESOLUTION ADOPTING

FEES PURSUANT TO THE

COST RECOVERY SYSTEM
WHEREAS, state law requires new fees and charges and increases in existing fees and charges be adopted by resolution following a public hearing on said fees and charges; and
WHEREAS, Chapter 3.70 of the Bakersfield Municipal Code authorizes the establishment and increase of fees under the cost recovery system; and WHEREAS, a public hearing before the City Council was advertised twice in the Bakersfield Californian, a newspaper of general circulation, and held on November 18, 2026; and
WHEREAS, the fees and charges set forth in Exhibit “A” including attached hereto and incorporated by reference as though fully set forth herein, do not exceed the reasonable estimated cost of providing the services for which the fees are charged.

NOW THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:

1. The above recitals and findings are true and correct.

2. The fees set forth in Exhibit “A” of the Master Fee Schedule are hereby, Adopted and shall become effective according to the following schedule:
a. Fee changes will be effective January 1, 2027
--------------oOo--------------
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by the Council of the City of Bakersfield at a regular meeting thereof held on ______________________________ by the following vote:

AYES: COUNCILMEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER _______________________________________________________________ ABSTAIN: COUNCILMEMBER _______________________________________________________________ ABSENT: COUNCILMEMBER ______________________________________________________________ _ ________________________________

JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED: _________________
By __________________________

KAREN GOH
Mayor
APPROVED AS TO FORM:

VIRGINIA GENNARO, CITY ATTORNEY
By _________________________
Ashley Zambrano
Deputy City Attorney II
Attachment
Exhibit “A”

A - INSPECTION FEES & SERVICES
A-1 NEW RESIDENTIAL AND COMMERCIAL CONSTRUCTION …………………………………………………………………… 3 A-2 RESIDENTIAL ADDITION, ALTERATION, REMODEL OR REPAIR …………………………………………………………………… 4 A-3 COMMERCIAL ADDITION, ALTERATION, REMODEL OR REPAIR …………………………………………………………………… 4 A-4 SPECIAL RESIDENTIAL AND COMMERCIAL CONSTRUCTION …………………………………………………………………… 5 A-5 STREET CUT INSPECTION …………………………………………………………………… 7
A-6 PUBLIC IMPROVEMENT INSPECTION …………………………………………………………………… 7 A-7 STREET ENCROACHMENT INSPECTION …………………………………………………………………… 8 A-8 STATE-MANDATED FIRE INSPECTION …………………………………………………………………… 8 A-9 OIL WELL INSPECTION (ANNUAL) …………………………………………………………………… 8 A-10 FIRE SAFETY REVIEW/INSPECTION …………………………………………………………………… 9 A-12 REINSPECTION OF MUNICIPAL CODE VIOLATIONS …………………………………………………………………… 10 A-14 SIGNS - PERMIT PROCESSING AND INSPECTION FEES …………………………………………………………………… 10 A-15 WIRELESS FACILITIES RIGHT-OF-WAY PERMIT …………………………………………………………………… 10 A-16 SHORT-TERM RENTALS …………………………………………………………………… 10

B - LAND USE REVIEW / PERMITS
B-20 CONDITIONS OF APPROVAL/COMPLIANCE FEE …………………………………………………………………… 11 B-21 CONDITIONAL USE PERMIT …………………………………………………………………… 11 B-22 HOME OCCUPATION REVIEW …………………………………………………………………… 11 B-23 FIRE SPRINKLER AND ALARM …………………………………………………………………… 11 B-25 TENTATIVE SUBDIVISION MAP REVIEW …………………………………………………………………… 13 B-26 MINOR LAND DIVISION REVIEW …………………………………………………………………… 14 B-27 PRELIMINARY PROJECT REVIEW …………………………………………………………………… 14 B-28 SITE PLAN REVIEW …………………………………………………………………… 15
B-29 SPECIFIC PLAN REVIEW …………………………………………………………………… 15 B-30 PUD OR PCD ZONE CHANGE …………………………………………………………………… 16 B-31 ZONE CHANGE REVIEW …………………………………………………………………… 16
B-32 APPEAL PROCESSING …………………………………………………………………… 16
B-33 GENERAL PLAN AMENDMENT REVIEW …………………………………………………………………… 16 B-34 CONCURRENT APPLICATION GPA/ZONE CHANGE …………………………………………………………………… 16 B-35 ZONE MODIFICATION REVIEW - MODIFICATIONS …………………………………………………………………… 16 B-36 SIGN REVIEW …………………………………………………………………… 16
B-37 MAP & IMPROVEMENT PLAN CHECKING …………………………………………………………………… 17 B-38 DEVELOPMENT TIME EXTENSION REVIEW …………………………………………………………………… 18 B-39 TRAFFIC MARKING REQUEST REVIEW …………………………………………………………………… 18 B-40 CERTIFIED UNIFIED PROGRAM AGENCY (CUPA) FEES …………………………………………………………………… 18 B-41 CULTURAL RESOURCE REVIEW …………………………………………………………………… 21 B-42 ENVIRONMENTAL REVIEW …………………………………………………………………… 21 B-43 HISTORIC DISTRICT REVIEW …………………………………………………………………… 21 B-44 WIDE/OVERLOAD REVIEW …………………………………………………………………… 21 B-45 PUBLIC HEARING NOTICE REQUIREMENTS …………………………………………………………………… 21

C - PUBLIC INFORMATION SERVICES
C-51 FIRE REPORT COPY …………………………………………………………………… 22
C-52 POLICE RECORDING DUPLICATION SERVICE …………………………………………………………………… 22 C-53 POLICE PHOTOGRAPH COPY …………………………………………………………………… 22 C-54 DOCUMENT PRINTING AND COPYING …………………………………………………………………… 22 C-55 REQUEST FOR PUBLIC RECORDS …………………………………………………………………… 22 C-56 RESEARCH AND CERTIFICATIONS …………………………………………………………………… 23 C-57 AGENDA/MINUTE MAILING SERVICE …………………………………………………………………… 23 C-58 MUNICIPAL CODE SUPPLEMENT …………………………………………………………………… 23

CITY OF BAKERSFIELD
PROPOSED MASTER FEE SCHEDULE FOR 2026-27

EXHIBIT "A"
1 of 42 11/4/2026

CITY OF BAKERSFIELD
PROPOSED MASTER FEE SCHEDULE FOR 2026-27

EXHIBIT "A"

D - PUBLIC SAFETY
D-61 BUSINESS REGULATION …………………………………………………………………… 23
D-62 CONCEALED WEAPON PERMIT PROCESSING …………………………………………………………………… 24 D-63 LIMOUSINE/TAXI/TOWING REGULATION …………………………………………………………………… 25 D-64 WEED ABATEMENT OR FIRE HAZARD ABATEMENT …………………………………………………………………… 25 D-65 HAZARDOUS MATERIAL RESPONSE …………………………………………………………………… 25 D-66 FIRE FALSE ALARM RESPONSE …………………………………………………………………… 25 D-67 POLICE FALSE ALARM RESPONSE …………………………………………………………………… 25 D-68 SPECIAL EVENT SAFETY SERVICES …………………………………………………………………… 25 D-69 AUTOMOTIVE ACCIDENT INVESTIGATION …………………………………………………………………… 26 D-70 FINGERPRINT SERVICE …………………………………………………………………… 26
D-71 VEHICLE CODE ENFORCEMENT …………………………………………………………………… 26 D-72 SCHOOL CROSSING GUARD SERVICE …………………………………………………………………… 26 D-73 PARKING ORDINANCE ENFORCEMENT …………………………………………………………………… 26 D-74 BOARD UP OF STRUCTURES …………………………………………………………………… 26 D-75 FIRE SERVICE FEES …………………………………………………………………… 27
D-76 ANIMAL CONTROL FEES …………………………………………………………………… 28

E - RECREATION / CULTURAL
E-82 PARK FACILITY RENTAL …………………………………………………………………… 28 E-83 RECREATION CENTER RENTAL …………………………………………………………………… 32 E-84 CITY ADULT PROGRAMS AND ACTIVITIES …………………………………………………………………… 34 E-85 CITY YOUTH PROGRAMS AND ACTIVITIES …………………………………………………………………… 35 E-86 AQUATIC PROGRAMS - RECREATIONAL SWIMMING …………………………………………………………………… 37 E-87 LEISURE CLASSES …………………………………………………………………… 39
E-88 AMPHITHEATRE FEES - THE PARK AT RIVER WALK …………………………………………………………………… 39

F - MISCELLANEOUS FEES
F-90 HEARINGS AND APPEALS …………………………………………………………………… 39 F-91 FIRE HYDRANT DISTRIBUTION AND INSTALLATION INSPECTION …………………………………………………………………… 39 F-92 DOCUMENT IMAGING …………………………………………………………………… 40
F-93 PROCESSING SCHOOL FACILITY FEES …………………………………………………………………… 40 F-94 COMPUTER DATA …………………………………………………………………… 40
F-95 ECONOMIC DEVELOPMENT FEES …………………………………………………………………… 41 F-97 RETURN CHECK CHARGE …………………………………………………………………… 41
F-98 CITY COUNCIL CHAMBER RENTAL …………………………………………………………………… 41 F-99 BROADCAST CHARGES FOR CITY COUNCIL CHAMBERS …………………………………………………………………… 41 F-100 BUSINESS LICENSE PROCESSING FEES …………………………………………………………………… 41 F-101 FOOD VENDING VEHICLE FEES …………………………………………………………………… 41 F-102 BLUE STAR MILITARY BANNER PROGRAM …………………………………………………………………… 41 F-103 DEVELOPMENT SERVICES …………………………………………………………………… 42 2 of 42 11/4/2026
2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Building Permits 54%
All construction (including: new, additional, alteration, remodel, repair, and other construction) for both
residential and commercial construction permit
processing, services, and inspection fees are calculated as follows: Two general methods are used to calculate
fees in service centers A1, A2, A3, and A4. The use of a flat fee and the use of the estimated regional market
value of the proposed construction multiplied by a "fee factor." These methods represent the estimated cost of
providing all plan review and various inspection fees
required for the project. Valuation data is based upon the February 2026 building valuation data (BVD). Alterations & Remodels will be valued at $82 per square foot or by an official contract approved by the Building Director. The revenue generated from this is then spread to the various costs center as follows: 54% N/A 0.00%
Plan Check Fees 46% 46% N/A 0.00%
A-1 Residential Construction - New, Additions, Alterations, Remodel or Repair Fees in cost center are cumulative based on the
construction value of the proposed permitted work and
include related plan review and inspections
1 Residential Construction - Permit Processing
and Inspection Fees
Valuation $1 to $40,000 $ 291 Each $ 291 $ - 0.00%
Valuation $40,001 to $100,000
$ 0.0039 x Valuation To mitigate fee increases driven by higher Building Valuation Data (BVD), the fee will be held flat.
$ 0.0039
$ - 0.00%
Valuation $100,001 and Greater
$ 0.0039 x Valuation To mitigate fee increases driven by higher Building Valuation Data (BVD), the fee will be held flat.
$ 0.0039
$ - 0.00%
Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
2 Residential Individual Trade Permit -
Electrical, Mechanical or Plumbing - Requiring
Multiple Inspections or Plan Check
Valuation $1 to $40,000 $ 236 Each
To mitigate fee increases driven by higher Building
Valuation Data (BVD), the fee will be held flat. $ 236 $ - 0.00% Valuation $40,001 and Greater
$ 0.0039 x Valuation To mitigate fee increases driven by higher Building Valuation Data (BVD), the fee will be reduced. $ 0.0039 $ - 0.00% Center
Number
A - Inspection Fees & Services
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers

Page 3 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
3 General Plan Maintenance $ 211 Each $ 211 $ - 0.00%
A-2 Commercial Construction - New, Additions, Alterations, Remodel or Repair Fees in cost center are cumulative based on the
construction value of the proposed permitted work and
include related plan review and inspections
1 Commercial Construction - Permit Processing
and Inspection Fees
Valuation $1 to $40,000 $ 450 Each $ 450 $ - 0.00%
Valuation $40,001 to $100,000,000 $ 0.0060 x Valuation
To mitigate fee increases driven by higher Building
Valuation Data (BVD), the fee will be reduced. $ 0.0060 $ - 0.00% Valuation $100,000,001 and $5,000,000 $ 0.0054 x Valuation To mitigate fee increases driven by higher Building
Valuation Data (BVD), the fee will be reduced. $ 0.0054 $ - 0.00% Valuation $5,000,001 and Greater $ 0.0049 x Valuation
To mitigate fee increases driven by higher Building
Valuation Data (BVD), the fee will be reduced. $ 0.0049 $ - 0.00% Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
2 Commercial Individual Trade Permit -
Electrical, Mechanical or Plumbing - Requiring
Multiple Inspections or Plan Check
Valuation $1 to $40,000 $ 246 Each $ 246 $ - 0.00%
Valuation $40,001 and Greater $ 0.0059 x Valuation
To mitigate fee increases driven by higher Building
Valuation Data (BVD), the fee will be reduced. $ 0.0059 $ - 0.00% A-3 Miscellaneous Commercial and Residential Construction Other than flat fee is calculated under service center A-1 or A-2
1 Residential or Commercial Individual Trade
Permit - Electrical, Mechanical or Plumbing -
Not Requiring Multiple Inspections or Plan
Check (complete list on file at Building
Division)
Permit Processing and Inspection Fees (each
permit) $ 140 Each $ 140 $ - 0.00%
2 Residential or Commercial Common Flat Fee
Permit - Electrical Mechanical and/or
Plumbing - Requiring Multiple Inspections and
Plan Check. Applies Only to Types of Work
Below:

Page 4 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Residential Solar System - Any Size $ 304 Each $ 304 $ - 0.00% Mobile Home with Permanent Foundation $ 353 Each $ 353 $ - 0.00% Pre-Manufactured Housing $ 353 Each $ 353 $ - 0.00%
Commercial Coach (Permanent) $ 353 Each $ 353 $ - 0.00% Commercial Pre-Manufactured (Permanent) $ 353 Each $ 353 $ - 0.00% Grease Interceptors $ 167 Each $ 167 $ - 0.00%
3 Residential Re-Roof - Permit Processing and
Inspection Fees
Valuation $1 to $30,000 $ 221 Each $ 221 $ - 0.00%
Valuation $30,001 and Greater $ 0.0038 x Valuation
To mitigate fee increases driven by higher Building
Valuation Data (BVD), the fee will be reduced. $ 0.0038 $ - 0.00% 4 Commercial Re-Roof - Permit Processing and
Inspection Fees
Valuation $1 to $30,000 $ 246 Each $ 246 $ - 0.00%
Valuation $30,001 and Greater $ 0.0059 x Valuation
To mitigate fee increases driven by higher Building
Valuation Data (BVD), the fee will be reduced. $ 0.0059 $ - 0.00% 5 Pools and Spas - Permit Processing and
Inspection Fees
Swimming Pools $ 280 Each $ 280 $ - 0.00%
Pool & Spa $ 353 Each $ 353 $ - 0.00%
Spa in Ground $ 187 Each $ 187 $ - 0.00%
6 Patio Addition (each permit - regardless of
size) $ 273 Each $ 273 $ - 0.00%
7 Oil Well Permit Fee $ - Each
This fee is recommended for removal as it is no longer
functional. $ - $ - NA
8 Retaining Wall or Fencing
Minimum Fee $ 140 Each $ 140 $ - 0.00%
Other (length greater than 80 linear feet) $ 0.85 x Foot $ 0.85 $ - 0.00% 9 Storage Racks/Shelves (each permit) $ 202 Each $ 202 $ - 0.00% A-4 Special Building Services
1 Requested Plan Review Fees - Commercial
Expedite Plan Review (10 hour minimum) $ 127 x Hour $ 127 $ - 0.00%

Page 5 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Additional Plan Review (required by changes,
additions or revisions to approved plans) $ 135
x Hour
$ 135 $ - 0.00%
2 Requested Plan Review Fees - Residential
Expedite Plan Review (8 hour minimum) $ 103 x Hour $ 103 $ - 0.00% Additional Plan Review (required by changes,
additions or revisions to approved plans) $ 108
x Hour
$ 108 $ - 0.00%
3 Special Inspections - Requested Building Inspection Fees Normal Business Hours (2 hour minimum) $ 99 x Hour $ 99 $ - 0.00% Outside Normal Business Hours (2 hour
minimum) Actual Cost x Hour Based on salary schedule Actual Cost N/A N/A 4 Re-Inspections - Requested Building Inspection Fees
Normal Business Hours (2 hour minimum) $ 99 x Hour $ 99 $ - 0.00% Outside Normal Business Hours (2 hour
minimum) Actual Cost x Hour Based on salary schedule Actual Cost N/A N/A 5 Temporary Sales Lots - Permit Processing and Inspection Fees Temporary Sales Lots (includes Christmas
tree & pumpkin lots, fireworks booths, parking
lot, tent sales, etc.) $ 140 Each
The proposed increase is necessary to align with rising operational costs, including salary adjustments per the current salary schedule and increased expenditures for
program and service delivery. $ 140 $ - 0.00%
6 Government Structures - Permit Processing and Inspection Fees Government Structures (includes structures
and property owned by a Federal, State,
County or City agency) $ - Each Exempt $ - N/A N/A
7 Request for Code Modification
Per Modification $ 302 Each $ 302 $ - 0.00%
Additional Review and Analysis $ 193 Each $ 193 $ - 0.00% 8 Request for Alternate Material & Method
Per Alternate Material / Method $ 302 Each $ 302 $ - 0.00% Additional Review and Analysis (2 hour
minimum) $ 121 x Hour $ 121 $ - 0.00%
9 Unreasonable Hardship Review (2 hour
minimum) $ 135 x Hour $ 135 $ - 0.00%

Page 6 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
10 Permit Extension $ 81 Each $ 81 $ - 0.00%
11 Special Inspector Registration $ 39 Each $ 39 $ - 0.00% 12 Temporary Certificate of Occupancy
Initial Certificate $ 362 Each $ 362 $ - 0.00%
Additional Extension $ 180 Each $ 180 $ - 0.00%
13 Grading Inspection
Grading Inspection (base fee) $ 373 Each $ 373 $ - 0.00% Re-Inspection Fee $ 90 x Hour $ 90 $ - 0.00%
14 OSHPD 3 Inspections (Office of Statewide
Health Plan & Development) Actual Cost Each Actual Cost N/A N/A A-5 Street Cut Inspection
1 Street Cut Permit (base fee) $ 404 Each $ 404 $ - 0.00% 2 Extra Inspection Fee (for each inspection over
the 2 inspections included in the base fee) $ 122 Each $ 122 $ - 0.00% 3 Cancellation Fee (no refund available if
inspection services have commenced) $ 119 Each $ 119 $ - 0.00% 4 Rider / Amendment Fee $ 39 Each $ 39 $ - 0.00%
A-6 Public Improvement Inspection

Page 7 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
1 Public Improvement Inspection $ 410 + 1.96% of
Valuation
1) Applicant will also be charged for the incremental costs of using outside consultants whenever applicant requests the use of outside consultants for inspection services
within normal working hours. Applicant will be charged full costs of using outside consultants when inspection
services are performed as overtime hours. Applicant will be charged full cost of using outside inspection services in cases where applicant requests expedited services
outside normal rotation.
2) Playground inspections will be charged to the applicant based upon actual costs incurred. This fee will only be charged in cases where an outside consultant inspects
the playground equipment for new parks.
$ 410 $ - 0.00%
2 Overtime Rate Actual Cost Each
1) Actual overtime costs will be charged for inspection requests outside standard workday of 7AM - 4PM Monday
- Friday
Actual Cost N/A N/A
A-7 Street
1 Street Encroachment Permit $ 676 Each $ 676 $ - 0.00% 2 Review of Easements $ 747 Each $ 747 $ - 0.00%
A-8 State-Mandated Fire Inspection
1 Consultation Requests for in Home Care
Facilities
$ 279 Each Fee increase is required to cover salary/operating expenses within the Fire Prevention Services Division. $ 279 $ - 0.00% 2 Fire Inspection
1-25 Units $ 279 Each $ 279 $ - 0.00%
26-50 Units $ 367 Each $ 367 $ - 0.00%
51-100 Units $ 455 Each $ 455 $ - 0.00%
A-9 Oil Well Inspection
1 Oil Well Inspection (annual) $ 279 Each
Fee increase is required to cover salary/operating
expenses within the Fire Prevention Services Division. $ 279 $ - 0.00%

Page 8 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
2 Re-Inspection (if required) $ 279 Each
Fee increase is required to cover salary/operating
expenses within the Fire Prevention Services Division. $ 279 $ - 0.00% 3 Oil Well Installation $ 144
Each Fee increase is required to cover salary/operating expenses within the Fire Prevention Services Division. $ 144 $ - 0.00% A-10 Fire Safety Review / Inspection
1 Safety Inspections
Private Party / Insurance Requests $ 279
x Hour Fee increase is required to cover salary/ operating expenses within the Fire Prevention Services Division. $ 279 $ - 0.00% Re-Inspection Fee $ 279
x Hour Fee increase is required to cover salary/ operating expenses within the Fire Prevention Services Division. $ 279 $ - 0.00% 2 Tent Installation
Tent Installation $ 375
x Hour Fee increase is required to cover salary/ operating expenses within the Fire Prevention Services Division. $ 375 $ - 0.00% Re-Inspection Fee
$ 144 x Hour Fee increase is required to cover salary/ operating expenses within the Fire Prevention Services Division. $ 144 $ - 0.00% After Hours Tent Installation $ 151 x Hour $ 151 $ - 0.00% After Hours Re-Inspection Fee $ 151 x Hour $ 151 $ - 0.00% 3 Explosives Purchase, Sales & Storage
Inspection and Permit Fee
First Inspection $ 297 Each $ 297 $ - 0.00%
Explosives Storage Permit $ 38 Each $ 38 $ - 0.00%
Re-Inspection Fee $ 119 x Hour $ 119 $ - 0.00%
4 Pyrotechnics Inspection Permit
Pyrotechnics Inspection Permit $ 119 Each One-Time Fee per Event $ 119 $ - 0.00% Normal Business Hours $ 119 x Hour $ 119 $ - 0.00%
After Hours Rate $ 151 x Hour $ 151 $ - 0.00%
5 Fireworks Booth Permit Fees
Application Fee - Fireworks Permit $ 48 Each Non-Refundable $ 48 $ - 0.00% Administrative & Inspection Services $ 258 Each $ 258 $ - 0.00%

Page 9 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Code Enforcement $ 383 Each Police and Fire $ 383 $ - 0.00% A-12 Re-Inspection of Municipal Code Violations
1 Dangerous Building Investigations
Initial Contact and Inspection $ - Each $ - $ - N/A
Follow-Up Inspections Required (each
occurrence) $ 363 Each $ 363 $ - 0.00%
Legal Action Required Actual Cost Each Actual Cost N/A N/A 2 Complaints and Enforcement
Initial Contact and Inspection $ - Each $ - $ - N/A
Follow-Up Inspections Required (each
occurrence) $ 195 Each $ 195 $ - 0.00%
Abatement Hearing Processing Fee $ 361 Each $ 361 $ - 0.00% Assessment Hearing Process Fee $ 604 Each $ 604 $ - 0.00% Abatement Warrant Processing $ 1,138 Each $ 1,138 $ - 0.00% Property Abatement Actual Cost Each Actual Cost N/A N/A Legal Action Required Actual Cost Each Actual Cost N/A N/A 3 Weed Abatement Appeals
Minimum Fee (no notice required) $ 783 Each $ 783 $ - 0.00% A-14 Sign - Permit Processing and Inspection Fees
1 Sign - Banner $ 103 Each $ 103 $ - 0.00%
2 Sign - Temporary $ 103 Each $ 103 $ - 0.00%
3 Sign - Permanent $ 234 Each $ 234 $ - 0.00%
4 Sign - Permanent - Face Change $ 103 Each $ 103 $ - 0.00% A-15 Wireless Facilities Right-of-Way Permit
1 Director Review - Co-Location on Existing
Pole $ 897 Each $ 897 $ - 0.00%
2 Consultant Permit Application Review
Services Actual Cost Each Actual Cost N/A N/A
A-16 Short-term Rentals (STRs)

Page 10 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
1 Application Fee - STR $ 431 Each NEW FEE $ - $ 431 NEW 2 STR Renewal $ 219 Each NEW FEE $ - $ 219 NEW
3 STR Reinspection fee $ 98 Each NEW FEE $ - $ 98 NEW
B-20 Conditions of Approval / Compliance Fee
1 Phase 2 - Building Permit Process $ 89 Each $ 89 $ - 0.00% B-21 Conditional Use Permit
1 General Review (all zones) - No Negative
Declaration $ 2,842 Each $ 2,842 $ - 0.00%
2 General Review (all zones) - With Negative
Declaration $ 2,842 Each $ 2,842 $ - 0.00%
B-22 Home Occupation Review
1 Home Occupation Permit $ 188 Each $ 188 $ - 0.00%
B-23 Fire Sprinkler and Alarm
1 Paint Booth Plan Review
Paint Booth Plan Review (P.I. = Plan
Inspection) $ 297 Each $ 297 $ - 0.00%
Re-Inspection Fee $ 119 x Hour $ 119 $ - 0.00%
2 Non-Flammable Medical Gas System Plan
Review $ 119 x Hour $ 119 $ - 0.00%
3 Existing Sprinkler System Addition Plan
Review (commercial)
B - Land Use Review / Permits

Page 11 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Minimum Fee $ 455 Each
Increase of fee to cover cost of all inspections including plan review time frame and office staff time to process permits.
$ 455 $ - 0.00%
Other Than Minimum (if over 10,000 Square
Footage) $ 0.0183 x Square
Footage $ 0.0183 $ - 0.00%
Re-Inspection Fee $ 119 x Hour $ 119 $ - 0.00%
4 Sprinkler System Plan Review (commercial)
Minimum Fee $ 183 Each $ 183 $ - 0.00%
Other Than Minimum (if over 10,000 Square
Footage) $ 0.0183 x Square
Footage $ 0.0183 $ - 0.00%
Re-Inspection Fee
$ 279 x Hour
This fee increase is to cover cost for office staff and inspector to conduct reinspections for permits that
contractors have called in for inspection; however, were not ready or failed.
$ 279 $ - 0.00%
5 Sprinkler System Plan Review (residential)
Minimum Fee $ 183 Each $ 183 $ - 0.00%
Other Than Minimum (if over 10,000 Square
Footage) $ 0.0183 x Square
Footage $ 0.0183 $ - 0.00%

Page 12 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Re-Inspection Fee $ 119 x Hour $ 119 $ - 0.00%
6 Fire Alarm System Plan Review
Minimum Fee $ 183 Each $ 183 $ - 0.00%
Other Than Minimum (if over 10,000 Square
Footage) $ 0.0183 x Square
Footage $ 0.0183 $ - 0.00%
Re-Inspection Fee $ 119 x Hour $ 119 $ - 0.00%
7 Commercial Vent Hood Plan Review
Minimum Fee $ 297 Each $ 297 $ - 0.00%
Inspection of Each Additional Vent Hood $ 71 Each $ 71 $ - 0.00% Re-Inspection Fee $ 119 x Hour $ 119 $ - 0.00%
8 Standpipe System Plan Review
Inspection of Standpipes $ 119 x Hour $ 119 $ - 0.00%
Re-Inspection Fee $ 119 x Hour $ 119 $ - 0.00%
9 Portable LPG Storage / Distribution (one-time
Fee for businesses with portable propane) $ 119 Each $ 119 $ - 0.00% 10 Mail Out Inspection $ 38 Each $ 38 $ - 0.00%
11 Fire Prevention Oversight
$ 471 Each
Fee increase necessary to recover costs associated with Fire Sprinkler and alarm permits throughout the City of Bakersfield. These inspections involve multiple inspection to the site to complete both the Fire Sprinkler and Fire Alarm permits
$ 471 $ - 0.00%
B-25 Tentative Subdivision Map Review
1 Parcel Map Review
Tentative Parcel Map Review $ 4,765 Each $ 4,765 $ - 0.00%

Page 13 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
2 Revised Parcel Map Review
Revised Tentative Parcel Map Review $ 3,944 Each $ 3,944 $ - 0.00% Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
3 Small Land Divisions Tentative Tract $ 4,187 Each $ 4,187 $ - 0.00% 4 Tract Map Review
Tentative Tract Map Review $ 5,656 Each $ 5,656 $ - 0.00% Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
5 Revised Tentative Tract Map Review $ 5,059 Each $ 5,059 $ - 0.00% 6 Wall and Landscape Review $ 1,699 Each $ 1,699 $ - 0.00% 7 Substantial Conformity Review $ 783 Each $ 783 $ - 0.00% 8 Street Naming $ 1,198 Each $ 1,198 $ - 0.00%
B-26 Minor Land Division Review
1 Lot Line Adjustment, Certificates of
Compliance, Owner Initiated Parcel Merger,
and Parcel Map Waiver $ 2,978 Each $ 2,978 $ - 0.00%
2 Parcel Map Waivers $ - Each $ - $ - N/A
3 Right of Way Vacations
Summary Vacation (map and legal description
provided) $ 695 Each $ 695 $ - 0.00%
Summary Vacation (no map and legal
description provided) $ 1,168 Each $ 1,168 $ - 0.00%
Non-Summary Vacation (map and legal
description provided) $ 1,168 Each $ 1,168 $ - 0.00%
Non-Summary Vacation (no map and legal
description provided) $ 1,639 Each $ 1,639 $ - 0.00%
B-27 Preliminary Project Review
1 Requested Land Use & Zoning Review $ 112 x Hour $ 112 $ - 0.00%

Page 14 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
2 Administrative Approvals
Advertised $ 1,209 Each $ 1,209 $ - 0.00%
Posted $ 760 Each $ 760 $ - 0.00%
3 Completeness Review $ 248 Each $ 248 $ - 0.00%
4 Development Review
Planned Development Review $ 3,238 Each $ 3,238 $ - 0.00% Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
5 Planned Development Review
Planned Development Review Revised $ 2,522 Each $ 2,522 $ - 0.00% Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
6 Sound Equipment Registration - Zoning
Check $ 10 Each $ 10 $ - 0.00%
B-28 Site Plan Review
1 Minimum Fee
Minimum Fee - No Hearing Required
(includes 3 reviews) $ 954 Each $ 954 $ - 0.00%
Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
2 Maximum Fee
Maximum Fee - No Hearing Required
(includes 3 reviews) $ 12,001 Each $ 12,001 $ - 0.00%
Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
3 Other than Minimum Fee Up to Maximum $ 0.002124 x Valuation $ 0.002124 $ - 0.00% 4 Additional Site Plan Review Fee (4th and
subsequent reviews) $ 161 Each $ 161 $ - 0.00%
5 Accessory Dwelling Unit (ADU) application fee $ 547 Each $ 547 $ - 0.00% B-29 Specific Plan Review
1 Review Fee $ 7,508 Each $ 7,508 $ - 0.00%

Page 15 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
2 Development Agreement $ 3,453 Each $ 3,453 $ - 0.00%
B-30 PUD or PCD Zone Change
1 Review Fee $ 5,959 Each $ 5,959 $ - 0.00%
2 Agriculture Preserve & Contract Formation or
Cancellation $ 1,185 Each $ 1,185 $ - 0.00%
B-31 Zone Change Review
1 Review Fee $ 4,707 Each $ 4,707 $ - 0.00%
2 Director Review $ 2,238 Each New Fee $ 2,238 $ - 0.00% B-32 Appeal Processing
1 Applicant or Property Owner Outside Notice
Area - Base Fee $ 1,149 Each $ 1,149 $ - 0.00%
2 Land Divisions $ 1,149 Each $ 1,149 $ - 0.00%
B-33 General Plan Amendment Review
1 Single Element $ 6,760 Each $ 6,760 $ - 0.00%
B-34 Concurrent Application GPA / Zone Change
1 Concurrent Application GPA / Zone Change
Fee $ 11,378 Each $ 11,378 $ - 0.00%
B-35 Zone Modification Review - Modifications
1 Zone Modification Review - Modifications $ 2,259 Each $ 2,259 $ - 0.00% 2 Density Bonus $ 1,892 Each $ 1,892 $ - 0.00%
B-36 Sign Review
1 Comprehensive Sign Review $ 1,685 Each $ 1,685 $ - 0.00%

Page 16 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
2 Comprehensive Sign Review - Revised $ 736 Each $ 736 $ - 0.00% B-37 Map & Improvement Plan Checking
1 Final Tract Maps / Final Parcel Maps
Base Fee $ 1,768 + 65.00 /
Lot $ 1,768 $ - 0.00%
Additional Fee After Two Checks 10% of Original
Fee 10% N/A N/A
Fire Department Growth Fee $ 200 Each $ 200 $ - 0.00%
2 Grading Plan Check Fee Fees for any grading plans not covered by the categories below will be computed on an actual cost basis
Subdivision Tracts, Commercial Projects,
Other Multi-Family Plans, Parcel Maps, and
Parcel Map Waivers $ 650
+ $25.00 /
Acre $ 650 $ - 0.00%
3 Street / Sewer Improvements
1) For projects that are not of the typical land
development or public works projects, the city engineer may authorize time and materials for plan check &
inspection fees.
2) Applicant will also be charged for the incremental costs of using outside consultants whenever applicant requests the use of outside consultants for plan check services
within normal working hours. Applicant will be charged full cost of using outside consultants when plan check
services are performed as overtime hours. Applicant will be charged full costs of using outside plan check services in cases where applicant requests expedited services
outside normal rotation.
3) Actual overtime costs will be charged whenever
overtime services are requested by applicant.
4) Applicants who do not pick-up their plans from the
counter will be charged actual shipping costs incurred by the city in the mailing of plans.

Original Plan Submittal $ 608 + 1.28% of
Valuation $ 608 $ - 0.00%
Additional Plan Submittal After Second Check 10% of Original Fee 10% N/A N/A

Page 17 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Minor Revision to Plan After Plan Approved $ 608 Each $ 608 $ - 0.00% Major Revision to Plan After Plan Approved $ 608 + 1.28% of Valuation Based on current improvements $ 608 $ - 0.00% Major Revision to Plan During Checking
Process $ 608 + 1.28% of Valuation Based on revised portion $ 608 $ - 0.00% 4 Maintenance District Formation and
Assessment District Apportionment Fees
Maintenance District Formation Fee $ 1,166 Each $ 1,166 $ - 0.00% Apportionment Fee for Assessment Districts Actual Costs Each Name change only Actual Costs N/A N/A 5 Administrative Review
Map Phasing $ 780 Each $ 780 $ - 0.00%
Formation of Planned Drainage Area, Planned
Sewer Area, or Major Thoroughfare Districts $ 931 Each $ 931 $ - 0.00% B-38 Development Time Extension Review
1 Development Time Extension Review Fee $ 978 Each $ 978 $ - 0.00% 2 Request for Continuance $ 248 Each $ 248 $ - 0.00%
3 Requested Plan Review Expedite $ 167 Each $ 167 $ - 0.00% B-39 Traffic Marking Request Review
1 Traffic Marking Request Review Fee $ 294 Each $ 294 $ - 0.00% B-40 Certified Unified Program Agency (CUPA) Fees
1 Hazardous Materials Handler Fees
Material Type 1 $ 144
Each Fee increase is required to cover salary/ operating expenses within the Fire Prevention Services Division. $ 144 $ - 0.00% Material Type 2 $ 286 Each $ 286 $ - 0.00%
Material Type 3 $ 356 Each $ 356 $ - 0.00%
Material Type 4 $ 526 Each $ 526 $ - 0.00%
Material Type 5 $ 393 Each $ 393 $ - 0.00%
Material Type 6 $ 393 Each $ 393 $ - 0.00%

Page 18 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Material Type 7 $ 593 Each $ 593 $ - 0.00%
Material Type 8 $ 683 Each $ 683 $ - 0.00%
Material Type 9 $ 286 Each $ 286 $ - 0.00%
Material Type 10 $ 526 Each $ 526 $ - 0.00%
Material Type 11 $ 683 Each $ 683 $ - 0.00%
Material Type 12 $ 729 Each $ 729 $ - 0.00%
Material Type 13 $ 393 Each $ 393 $ - 0.00%
Material Type 14 $ 683 Each $ 683 $ - 0.00%
Material Type 15 $ 729 Each $ 729 $ - 0.00%
Material Type 16 $ 767 Each $ 767 $ - 0.00%
Material Type 17 Inspection Fee
$ 279 x Hour Fee increase is required to cover salary/ operating expenses within the Fire Prevention Services Division. $ 279 $ - 0.00% Material Type 18 Small Quantity Generator $ 88 Each $ 88 $ - 0.00% 2 Hazardous Waste Permits
Conditionally Exempt $ 147 Each $ 147 $ - 0.00%
Permit by Rule $ 316 Each $ 316 $ - 0.00%
Conditionally Authorized $ 236 Each $ 236 $ - 0.00%
Large Quantity Generator (LQG) $ 367 Each
Fee increase is required to come in line with the actual time fire inspectors spend on site to do inspections of these large sites. $ 367 $ - 0.00%
3 Oversight for Environmental Services
Follow-Up on Hazardous Waste Violation Fee $ 141 x Hour $ 141 $ - 0.00% Risk Management Prevention Plan Fee -
Lower Risk Sites $ 419 Each $ 419 $ - 0.00%
Risk Management Prevention Plan Fee -
Moderate Risk Sites $ 578 Each $ 578 $ - 0.00%
Risk Management Prevention Plan Fee -
Medium Risk Sites $ 838 Each $ 838 $ - 0.00%
Risk Management Prevention Plan Fee - High
Risk Sites $ 1,324 Each $ 1,324 $ - 0.00%
Risk Management Prevention Plan Fee -
Extreme Risk Sites $ 2,651 Each $ 2,651 $ - 0.00%
Site Assessment & Cleanup Oversight $ 141 x Hour $ 141 $ - 0.00% Underground Storage Tank Oversight $ 141 x Hour $ 141 $ - 0.00% Spill Prevention Control & Countermeasure
Plan $ 141 x Hour $ 141 $ - 0.00%

Page 19 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
4 Underground Storage Tank Permits
New Tank Installation $ 1,122 Each $ 1,122 $ - 0.00%
Re-Inspection Fee $ 119 x Hour $ 119 $ - 0.00%
Annual Operating Permit $ 361 Each $ 361 $ - 0.00%
Mandated Leak Detection Testing $ 144
x Hour Fee increase is required to cover salary/ operating expenses within the Fire Prevention Services Division. $ 144 $ - 0.00% Tank Modification $ 1,122 Each $ 1,122 $ - 0.00%
Minor Tank Modification $ 226 Each $ 226 $ - 0.00%
Tank Removal $ 761 Each $ 761 $ - 0.00%
5 State Surcharge
Hazardous Materials Handler Set by State Each Fee is established by State of California Set by State N/A N/A Hazardous Waste Permits Set by State Each Fee is established by State of California Set by State N/A N/A Oversight for Risk Management Prevention
Plan Set by State Each Fee is established by State of California Set by State N/A N/A Underground Storage Tank Permits Set by State Each Fee is established by State of California Set by State N/A N/A Above Ground Petroleum Storage Tanks Set by State Each Fee is established by State of California Set by State N/A N/A 6 File Research Fee $ 59 x Hour $ 59 $ - 0.00%
7 Above Ground Flammable Liquid Storage
Tank Installation Inspection
Installation Inspection of One Tank $ 254 Each $ 254 $ - 0.00% Charge for Each Additional Tank $ 119 x Hour $ 119 $ - 0.00%

Page 20 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Tank Removal
$ 157 Each $ 157 $ - 0.00%
Re-Inspection Fee $ 119 x Hour $ 119 $ - 0.00%
B-41 Cultural Resource Review
1 Cultural Resource Review Fee $ 3,888 Each Revive of Cultural Resource Designation Application $ 3,888 $ - B-42 Environmental Review
1 Environmental Impact Report Actual Costs Each $2,500 minimum deposit Actual Costs N/A N/A 2 County Clerk
County Clerk Filing Fee $ 50 Each County charges a flate rate of $50 $ 50 $ - 0.00% County Clerk Filing Fee - Admin
$ 49 Each
This proposed fee is necessary to recoup the cost incured by staff to process all fees associated with the County Clerk filing.
$ 49 $ - N/A
3 Environmental Review for Negative
Declarations $ 2,418 Each $ 2,418 $ - 0.00%
B-43 Historic District Review
1 Historic District Review Fee $ 3,339 Each $ 3,339 $ - 0.00% B-44 Wide / Overload Review
1 Single Trip $ 16 Each Fee Set by State of California $ 16 $ - 0.00% 2 Annual Trip $ 90 Each Fee Set by State of California $ 90 $ - 0.00% 3 Special Service Charge $ 50 Each Fee Set by State of California $ 50 $ - 0.00% B-45 Public Hearing Notice Requirements
1 Public Hearing Notice Fee $ 623 Each $ 623 $ - 0.00%
2 Project Site Sign Posting Inspection $ 55 Each $ 55 $ - 0.00%

Page 21 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
C-51 Fire Report Copy
1 Fire Report Copy $ 0.02 x Page No charge for documents that are less than 250 pages - per copy charge is a minimum collection amount of $5.00 $ 0.02 $ - 0.00% C-52 Police Recording Duplication Service
1 Police Recording Duplication Service Fee $ 11.00 x QTR Hour $ 11.00 $ - 0.00% C-53 Police Photograph Copy
1 Digital Imaging Sale $ 11.00 Each $ 11.00 $ - 0.00%
C-54 Document Printing and Copying
1 Photocopying Charges No charge for documents that are less than 250 pages - per copy charge is a minimum collection amount of $5.00 Standard & Legal Sized Documents $ 0.02 x Page $ 0.02 $ - 0.00% Copy of Microfilmed Documents $ 0.02 x Page $ 0.02 $ - 0.00% Special Maps & Oversized Documents Actual Cost Each Actual cost based on labor & materials Actual Cost N/A N/A 2 Printed Documents (IE budget) Actual Cost Each Actual cost based on labor & materials Actual Cost N/A N/A 3 Police Crime Reports $ 0.02 x Page
No charge to the filer; No charge for documents that are less than 250 pages - per copy charge is a minimum
collection amount of $5.00
$ 0.02 $ - 0.00%
C-55 Request for Public Records
1 Requests for Public Records
Photocopying Charges No charge for documents that are less than 250 pages - per copy charge is a minimum collection amount of $5.00 Standard & Legal Size $ 0.02 x Page $ 0.02 $ - 0.00%
Copies from Microfilm $ 0.02 x Page $ 0.02 $ - 0.00%
Other Direct & Indirect Charges Actual Cost Each Actual Cost N/A N/A C - Public Information Services

Page 22 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
2 Requests by Subpoena
Copy Service Fee (to locate & compile
records) $ 15 Each Fee set by legislation $ 15 $ - 0.00% Direct Labor Costs (to locate, compile & copy
records $ 24 x Hour Fee set by legislation $ 24 $ - 0.00% Photocopying Charges
Standard & Legal Size $ 0.10 Each Fee set by legislation $ 0.10 $ - 0.00% Copies from Microfilm $ 0.20 Each Fee set by legislation $ 0.20 $ - 0.00% Other Direct Charges Actual Cost Each Fee set by legislation Actual Cost N/A N/A C-56 Research and Certification
1 Certification $ 5 Each Fee is charged per document $ 5 $ - 0.00% C-57 Agenda / Minutes Mailing Service
1 Agenda / Minutes Mailing Service - (charge
per year) $ 88 per Year $ 88 $ - 0.00%
2 Council Agenda Packet - (charge per packet
per meeting) Actual Cost Each Actual Cost N/A N/A
C-58 Municipal Code Supplement
1 Municipal Code Supplement Fee $ 97 Each $ 97 $ - 0.00% D-61 Business Regulation
1 Adult Entertainment
New Application $ 954 Each $ 954 $ - 0.00%
Annual Permit Renewal $ 3,442 Each $ 3,442 $ - 0.00%
Employee Permit $ 38 Each $ 38 $ - 0.00%
2 Massage Establishments
Massage Establishments Fee $ 353 Each New & renewal $ 353 $ - 0.00% Massage Technician $ 105 Each New & renewal $ 105 $ - 0.00% 3 Escort / Dating Services
New Application $ 636 Each $ 636 $ - 0.00%
D - Public Safety

Page 23 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Renewal Application $ 303 Each $ 303 $ - 0.00%
Employee - New $ 161 Each $ 161 $ - 0.00%
Employee - Renewal $ 100 Each $ 100 $ - 0.00%
4 Retail Sales of Firearms Permits $ 28 Each $ 28 $ - 0.00% 5 Liquidation (closeout) Sale-Permit $ 64 Each $ 64 $ - 0.00% 6 Bingo
New Permit $ 77 Each $ 77 $ - 0.00%
Renewal Permit $ 77 Each $ 77 $ - 0.00%
Remote Caller Application Fee $ 101 Each $ 101 $ - 0.00% 7 Second Hand Dealers, Itinerant, Merchants,
Public Dance Halls, Outdoor Festivals,
Cabarets, Temporary Promotional Activities,
House Address Curb Painting, Jewelry
Auctions, Special Events, Hotels & Lodging
Houses
$ 105 Each Includes new house address curb painting $ 105 $ - 0.00% 8 Bail Bond Owner / Agents / Solicitors $ 35 Each $ 35 $ - 0.00% 9 Pushcart Food Vendors $ 64 Each $ 64 $ - 0.00%
10 Motion Picture Permit $ 115 Each $ 115 $ - 0.00%
11 Resident Solicitation
For-Profit $ 23 Each $ 23 $ - 0.00%
Non-Profit $ - Each $ - $ - N/A
12 Public Convenience and / or Necessity
Approval (alcohol permit) $ 401 Each $ 401 $ - 0.00%
13 Transient Outdoor Permit $ 100 Each $ 100 $ - 0.00%
D-62 Concealed Weapon Permit Processing
1 Concealed Weapon Permit
Concealed Weapon Permit $ 103 Each $ 103 $ - 0.00%
Renewal $ 11 Each $ 11 $ - 0.00%

Page 24 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
D-63 Limousine / Taxi / Towing / Ambulance Regulation
1 Limousine
Limousine Driver Permit $ 65 Each $ 65 $ - 0.00%
Limousine Vehicle Inspection $ 52 Each $ 52 $ - 0.00%
2 Taxi
Taxi Driver Permit $ 55 Each Set by ordinance $ 55 $ - 0.00% Taxi Driver Permit Renewal $ 34 Each Set by ordinance $ 34 $ - 0.00% Taxi Driver Permit Transfer $ 7 Each Set by ordinance $ 7 $ - 0.00% Taxi Driver Permit Duplicate $ 7 Each Set by ordinance $ 7 $ - 0.00% Taxi Vehicle Inspection $ 52 Each $ 52 $ - 0.00%
3 Towing
Towing Vehicle Inspection $ 52 Each $ 52 $ - 0.00%
4 Ambulance
Ambulance Vehicle Inspection $ 52 Each Inspections currently done by CHP $ 52 $ - 0.00% D-64 Weed Abatement or Fire Hazard Abatement
1 Weed Abatement or Fire Hazard Abatement
Fee $ 245 Each $ 245 $ - 0.00%
D-65 Hazardous Material Response
1 Hazardous Material Response Fee Actual Cost Each Billed with labor & equipment rental fee Actual Cost N/A N/A D-66 Fire False Alarm Response
1 Fire False Alarm Response Fee $ 438 Each Billed upon 3rd alarm within 12 months $ 438 $ - 0.00% D-67 Police Alarm Permit
1 Police Alarm Permit
Initial Alarm Permit $ 38 Each $ 38 $ - 0.00%
Alarm Permit Renewal $ 15 Each $ 15 $ - 0.00%
D-68 Special Event Safety Services

Page 25 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
1 Police - Special Event Security (labor and / or
Equipment Actual Cost Each Actual Cost N/A N/A
2 Police - 2nd Response to Loud & Unruly
Complaint
Actual Cost or
$1,000 Each Fee is whichever is less Actual Cost or $1,000 N/A N/A 3 Fire - Special Event Services (labor and / or
Equipment) Actual Cost Each Actual Cost N/A N/A
D-69 Automotive Accident Investigation
1 Standard Report & Short Form $ 7 Each
Report $ 7 $ - 0.00%
D-70 Fingerprint Service
1 Charge per Applicant per Function $ 12 Each $ 12 $ - 0.00% D-71 Vehicle Code Enforcement
1 Unlicensed Driver Fee (includes towing
charge) $ 157 Each $ 157 $ - 0.00%
2 DUI Towing Charge $ 353 Each $ 353 $ - 0.00%
D-72 School Crossing Guard Service
1 School Crossing Guard Service $ - Each $ - N/A N/A
D-73 Parking Ordinance Enforcement
1 Vehicle Towing $ 107 Each $ 107 $ - 0.00%
2 Parking Violation Set by
Resolution Each Fee set by resolution 118-94 Set by Resolution N/A N/A D-74 Board-Up of Structures
1 Labor Costs per Inspector per Hour Actual Cost x Hour Based on latest salary schedule Actual Cost N/A N/A 2 Cost of Materials Actual Cost Each Actual Cost N/A N/A

Page 26 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
D-75 Fire Service Fees
1 Motor Vehicle Incidents
Level 1 - Traffic Accident / Traffic Collision $ 621 Each Provide hazardous materials assessment and scene stabilization $ 621 $ - 0.00% Level 2 - Traffic Accident / Traffic Collision
with mitigation of fluids $ 709 Each
Incident with mitigation of fluids Includes Level 1 services as well as clean up and material used (sorbents) for hazardous fluid clean up and disposal.
$ 709 $ - 0.00%
Level 3 - Vehicle Fire $ 865 Each
Incident requiring fire suppression, breathing air, hand tools, hose, foam, exposure protection, and clean up gasoline or other automotive fluids that are spilled.
$ 865 $ - 0.00%
Level 4 - Vehicle Fire Reinforced $ 709 Each
Incident involving train, semi or recreational vehicle requiring fire suppression, breathing air, hand tools, hose, foam, exposure protection, and clean up gasoline or other automotive fluids that are spilled.
$ 709 $ - 0.00%
Add on Services: Rescue/Extraction $ 1,870 Each This charge will be added if the fire department must free/remove anyone from the vehicle(s) using any equipment. $ 1,870 $ - 0.00% Create a landing zone $ 571 Each The department will bill at this level any time a helicopter landing zone is created and/or is utilized to transport the patient(s). $ 571 $ - 0.00% 2 Hazmat Incident
Level 1 - 1 Engine and Haz-Mat team consult $ 1,004 Each Release or threatened release of harmful materials in limited or isolated amounts with no immediate danger to life or health. $ 1,004 $ - 0.00% Level 2 - Inc. 2 Engines, Haz-Mat Team, PIO,
Prevention & Safety Officer. $ 3,587 Each Release or threatened release of harmful materials, in moderate amounts, that may be immediately dangerous to life or health. $ 3,587 $ - 0.00% Level 3 - Inc. 2 Engines, 1 Truck, Haz-Mat
Team, PIO, Prevention, Safety Officer &
Deputy Chief.
$ 8,469 Each
Release or threatened release of hazardous materials in significant amounts and/or materials that may be immediately dangerous to life or health. Includes 3 hours of on-scene time
$ 8,469 $ - 0.00%
- each additional hour @ $381.00 per
HAZMAT team. $ 404 Hour $ 404 $ - 0.00%
3 Fires
Fire Engine Callouts $ 572 Each Includes: Scene Safety, investigation & Fire / Hazard Control $ 572 $ - 0.00% Hourly charge per Engine $ 715 Hour Includes: Scene Safety, investigation & Fire / Hazard Control $ 715 $ - 0.00% 4 Water Rescue Incidents
Rescue team (per person) $ 70 Hour $ 70 $ - 0.00%
Haz Mat Team (per person) $ 142 Hour $ 142 $ - 0.00%
Level 1 - Basic Response $ 572 Each
Include engine response, first responder assignment, perimeter establishment, evacuations, first responder set-up and command, scene safety, and investigation.
$ 572 $ - 0.00%

Page 27 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Level 2 - Intermediate Response $ 1,146 Each
Includes Level 1 services as well as clean up and material used, minor hazardous clean up, and disposal. The department will bill at this level if the fire department must clean up small amounts of gasoline or other fluids that are spilled as a result of the incident $ 1,146 $ - 0.00%
Level 3 - Advance Response $ 2,837 Each
Includes Level 1 and Level 2 services as well as USAR activation, donning of breathing apparatus, and the use of detection equipment.

Potential Haz Mat Response.
$ 2,837 $ - 0.00%
Level 4- Itemized Response $ 572 Each
The City has the option to bill each incident as an independent event with custom mitigation rates for each incident using itemized rates deemed usual, customary, and reasonable (UCR). These incidents will be billed, itemized, per trained rescue person, plus rescue products used
$ 572 $ - 0.00%
- Additional rates $ 572 Hour
Each incident will be billed with custom mitigation rates deemed usual, customary, and reasonable (UCR). These incidents will be billed, itemized per apparatus per hour, per trained rescue person per hour, plus rescue products used.
$ 572 $ - 0.00%
5 Lift Assist Fee $ 500 $ 500 $ - 0.00%
D-76 Animal Control Fees
1 Boarding Costs $ 25 Per day Cost to house an animal per day $ 25 $ - 0.00% 2 Impound Costs
1st Impound $ 79 Each Cost charged to resident to redeem animal from shelter $ 79 $ - 0.00% 2nd Impound $ 159 Each $ 159 $ - 0.00%
3rd Impound $ 319 Each $ 319 $ - 0.00%
3 License Fees
Breeder License $ 106 Each $ 106 $ - 0.00%
Kennel Lincense $ 106 Each $ 106 $ - 0.00%
E-82 Park Facility Rental
*Facility Rental Fees are subject to the following
adjustments:

E - Recreation / Cultural

Page 28 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers

1. Non-Profit Rate (Pre-approval required): 25% discount on the base reservation fee is available to qualifying non-profit organizations. Eligibility must be verified with proof of 501(c) (3) status and a Tax ID number, along with
Recreation and Parks department approval. Field rentals, Program fees, Miscellaneous and Amenity Fees are
exempt from this rate.

2. Commercial Rate: Commercial or for-profit events are subject to a surcharge fee of 25% above the base rental fee, and an additional fee of up to 10% of gross event
revenue. An event is subject to the commercial rate when they meet one or more of the following criteria (qualifying non-profits exempt): the group is charging admission to the event or is selling a product or a service at the event. 1 Non-Resident Fee $ 26 Each
Added to all resident fees below (excludes alcohol permit & rescheduling / cancellation fees). Rates have not been increased based on the CPI per Parks program needs.
$ 26 $ - 0.00%
2 Park Area Rental - One Area - Resident
(excludes the park at the riverwalk,
Bakersfield sports village park and mesa
marin park)
Half-Day Rental (7AM - 2PM or 3PM - 10PM) $ 101 Each Excludes alcohol permit. $ 101 $ - 0.00% Full Day Rental $ 204 Each Excludes alcohol permit. $ 204 $ - 0.00% Park Serving Shelter Rental - Half-Day $ 31 Each $ 31 $ - 0.00% $ 64 Each $ 64 $ - 0.00%
3 The Park at River Walk - One Area - Resident
Half-Day Rental (7AM - 2PM or 3PM - 10PM) $ 176 Each Excludes alcohol permit. $ 176 $ - 0.00% Full-Day Rental $ 353 Each Excludes alcohol permit. $ 353 $ - 0.00% 4 Bakersfield Sports Village Park - One Area -
Resident
Half-Day Rental (7AM - 2PM or 3PM - 10PM) $ 176 Each Excludes alcohol permit. $ 176 $ - 0.00%

Page 29 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Full-Day Rental $ 353 Each Excludes alcohol permit. $ 353 $ - 0.00% 5 Mesa Marin Park - One Area - Resident
Half-Day Rental (7AM - 2PM or 3PM - 10PM) $ 176 Each Excludes alcohol permit. $ 176 $ - 0.00% Full-Day Rental $ 353 Each Excludes alcohol permit. . $ 353 $ - 0.00% 6 Exclusive Use of Park Facilities
Half-Day Rental (excludes the park at the
riverwalk, Bakersfield sports village park and
mesa marin park)
$ 573 Each Excludes alcohol permit $ 573 $ - 0.00%
Full-Day Rental (excludes the park at the
riverwalk, Bakersfield sports village park and
mesa marin park)
$ 1,150 Each Excludes alcohol permit $ 1,150 $ - 0.00%
Half-Day Rental - Park at Riverwalk $ 1,150 Each Excludes alcohol permit $ 1,150 $ - 0.00% Full-Day Rental - Park at Riverwalk $ 2,305 Each Excludes alcohol permit $ 2,305 $ - 0.00% Half-Day Rental - Bakersfield Sports Village
Park $ 1,150 Each Excludes alcohol permit $ 1,150 $ - 0.00% Full-Day Rental - Bakersfield Sports Village
Park $ 2,305 Each Excludes alcohol permit $ 2,305 $ - 0.00% Half-Day Rental - Mesa Marin Park $ 1,150 Each Excludes alcohol permit $ 1,150 $ - 0.00% Full-Day Rental - Mesa Marin Park $ 2,305 Each Excludes alcohol permit $ 2,305 $ - 0.00% City Staff Charges - Supervision Actual Costs x Hour 2 hour minimum Actual Costs N/A N/A City Staff Charges - Custodial Actual Costs x Hour 2 hour minimum Actual Costs N/A N/A 7 Sports Field Rental
Sports Field Rental $ 28 x Hour 2 hour minimum $ 28 $ - 0.00% Sports Field Lighting $ 38 x Hour 2 hour minimum $ 38 $ - 0.00% Field Prep $ 48 Each $ 48 $ - 0.00%
Field Prep - Partial with Chalk Only $ 23 Each $ 23 $ - 0.00% Field Prep - Partial with Chalk and Water Only $ 37 Each $ 37 $ - 0.00% 8 Sports Field Rental - Tournament (per field
per day)
Sports Field Rental - Tournament $98 per Day
per Field +
10% of
Gross
Receipts
Non-profits excluded from 10% of gross receipts fee $98 per Day per Field $ - 0.00%
Field Prep $ 48 Each 1st game prep included in rental fee $ 48 $ - 0.00% Field Prep - Partial with Chalk Only $ 23 Each $ 23 $ - 0.00%

Page 30 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Field Prep - Partial with Chalk and Water Only $ 37 Each $ 37 $ - 0.00% Sports Field Lighting $ 38 x Hour 2 hour minimum $ 38 $ - 0.00% 9 Mesa Marin Sports Field Rental - Tournament
(per Field per Day)
Mesa Marin Sports Field Rental - Tournament $ 132 x per Day per Field Excludes alcohol permit $ 132 $ - 0.00%
Sports Field Lighting $ 38 x Hour 2 hour minimum $ 38 $ - 0.00% 10 Park Amenities - Tournaments (per day)
Horseshoe Pits $ 63 x Day $ 63 $ - 0.00%
Tennis Courts $ 63 x Day $ 63 $ - 0.00%
Basketball Courts (outdoor) $ 63 x Day $ 63 $ - 0.00%
Sand Volleyball $ 63 x Day $ 63 $ - 0.00%
Pickleball Courts - Formerly Pickleball Courts
(4 hours or less)
$ 15 x Hour
2 hour minimum. Includes 1 Court. Based on a
comprehensive fee survey of similar facilities in
surrounding municipalities, the proposed rates are
reflective of current industry standards.
$ 15 $ - 0.00%
Pickleball Courts $ - x Day Includes 2 Courts $ - $ - 0.00% Jastro Park - Pickleball Tournament $1200 per Day +
Up to10%
of Gross
Receipts
Includes 10 Courts. Non-profits excluded from 10% of
gross receipts fee. $1200 per Day $ - 0.00%
Beale Park - Pickleball Tournament $480 per Day +
Up to10%
of Gross
Receipts
Includes 4 Courts. Non-profits excluded from 10% of
gross receipts fee. $480 per Day $ - 0.00%
11 Alcohol Permit
Alcohol Permit - with Facility Reservation (non-refundable) $ 25 Each $ 25 $ - 0.00% Alcohol Permit - without Facility Reservation
(non-refundable) $ 37 Each $ 37 $ - 0.00%
12 Special Event Reservation Fee $ 164 Each
Minimum Fee - depending on size of event , additional
charges will be incurred based on actual costs (non-refundable) $ 164 $ - 0.00%
13 Late Fee $ 38 Each Fee to encourage timely submission of applications $ 38 $ - 0.00% 14 Cancellation Fee $ 37 Each $ 37 $ - 0.00%

Page 31 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
15 Sound Permit $ 37 Each $ 37 $ - 0.00%
16 Rescheduling Fee on Facility Rentals $ 24 Each $ 24 $ - 0.00% 17 Cancellation Fee on Facility Rentals $ 37 Each $ 37 $ - 0.00% 18 Mobile Stage Rental (per day) $ 1,300 x Day $ 1,300 $ - 0.00% 19 Vendor Display Booth at Events (no sales)
Private $ 37 Each $ 37 $ - 0.00%
Non-Profit $ 23 Each $ 23 $ - 0.00%
20 Portable Bleachers Rental $ 792 x
per Day
per
Bleacher
Minimum 1 day rental # $ 792 $ - 0.00%
21 Adopt-a-Bench
Plaque Only Actual Cost Each Fee changes each year setting it at actual cost will ensure that all expenses are recouped. Actual Cost N/A N/A
Bench (with section for plaque) Actual Cost Each Fee changes each year setting it at actual cost will ensure that all expenses are recouped. Actual Cost N/A N/A
22 Ticketed Event Fee
Ticket Surcharge Fee $ 1 x per Ticket
/ Attendee
Applicable at all City owned Recreation and Park
facilities. Ticket surcharge fee is to be applied to all tickets sold for attendance at events. Non-profit
organizations not applicable.
$ 1 $ - 0.00%
Parking Fee 10% of Collected
Fees
To be used when renter blocks off an entire or part of a parking lot. 10% of parking spot sales, based on spots
provided by City
$ 0 - N/A
E-83 Recreation Center Rental
*Facility Rental Fees are subject to the following
adjustments:

Page 32 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers

1. Non-Profit Rate (Pre-approval required): 25% discount on the base reservation fee is available to qualifying non-profit organizations. Eligibility must be verified with proof of 501(c) (3) status and a Tax ID number, along with
Recreation and Parks department approval. Field rentals, Program fees, Miscellaneous and Amenity Fees are
exempt from this rate.

2. Commercial Rate: Commercial or for-profit events are subject to a surcharge fee of 25% above the base rental fee, and an additional fee of up to 10% of gross event
revenue. An event is subject to the commercial rate when they meet one or more of the following criteria (qualifying non-profits exempt): the group is charging admission to the event or is selling a product or a service at the event. 1 Dr. Martin Luther King Junior (MLK) Park
Small Room Rental $ 52 x Hour 2 hour minimum $ 52 $ - 0.00% Large Room Rental $ 62 x Hour 2 hour minimum $ 62 $ - 0.00% Williams Multi-Purpose Room (gym) $ 79 x Hour 2 hour minimum - includes bleachers $ 79 $ - 0.00% Kitchen (with room rental) $ 18 x Hour 2 hour minimum $ 18 $ - 0.00% Table and Chair Set-Up Actual Cost Each Actual Cost N/A N/A Surcharge After 10 PM $ 64 x Hour $ 64 $ - 0.00%
City Staff Charges - Supervision Actual Cost x Hour 2 hour minimum Actual Cost N/A N/A City Staff Charges - Custodial Actual Cost x Hour 2 hour minimum Actual Cost N/A N/A 2 Silver Creek Community Center
Room Rental $ 121 x Hour 2 hour minimum - combined 2 rooms $ 121 $ - 0.00% Covered Pavilion $ 54 x Hour 2 hour minimum $ 54 $ - 0.00% Kitchen (with room rental) $ 44 x Hour 2 hour minimum $ 44 $ - 0.00% Table and Chair Set-Up Actual Cost Each Actual Cost N/A N/A Surcharge After 10 PM $ 64 x Hour $ 64 $ - 0.00%
City Staff Charges - Supervision Actual Cost x Hour 2 hour minimum Actual Cost N/A N/A City Staff Charges - Custodial Actual Cost x Hour 2 hour minimum Actual Cost N/A N/A 3 Saunder's Multi-Use Facility
Covered Pavilion $ 79 x Hour 2 hour minimum - includes lighting $ 79 $ - 0.00% 4 Mill House
Facility Rental $ 121 x Hour 2 hour minimum $ 121 $ - 0.00% 5 Community House

Page 33 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Room Rental $ 121 x Hour 2 hour minimum - combined 2 rooms $ 121 $ - N/A Kitchen (with room rental) $ 88 x Hour 2 hour minimum $ 88 $ - N/A Table and Chair Set-Up Actual Cost Each Actual Cost Actual Cost N/A Surcharge After 10 PM $ 64 x Hour $ 64 $ - N/A
City Staff Charges - Supervision Actual Cost x Hour 2 hour minimum Actual Cost Actual Cost N/A City Staff Charges - Custodial Actual Cost x Hour 2 hour minimum Actual Cost Actual Cost N/A E-84 City Adult Programs and Activities
1 Non-Resident Fee $ 10 Each Added to all resident fees below $ 10 $ - 0.00% 2 City Adult Volleyball Program - Resident
With Officials - Indoors $ 371 Each $ 371 $ - 0.00%
With Officials - Outdoors $ 309 Each $ 309 $ - 0.00%
Without Officials $ 126 Each $ 126 $ - 0.00%
Private Leagues Actual Cost Each Actual Cost N/A N/A
3 City Adult Softball Program - Resident
League Entry Fee per Team with Officials $ 504 Each $ 504 $ - 0.00% Rescheduling Fee $ 43 per Game $ 43 $ - 0.00%
Private Leagues Actual Cost Each Actual Cost N/A N/A
4 City Adult Basketball Program - Resident
Men's Program - City League $ 615 per Team Plus $39 per each additional game $ 615 $ - 0.00% Men's Program - Private Leagues Actual Cost Each Actual Cost N/A N/A 5 Adult Flag Football (per team) - Resident $ 347 per Team $ 347 $ - 0.00% 6 Adult Sports Tournaments - Resident 85% of Costs To recover 85% of tournament costs 85% $ - 0.00% 7 Adult Public Courts Team Tennis - Resident
Per Team $ 126 per Team $ 126 $ - 0.00%
Per Player $ 17 Each $ 17 $ - 0.00%
8 Corporate Team Challenge (per team) -
Resident $ 386 Each $ 386 $ - 0.00%
9 Sports Village Stadium Field Rental -
Resident
Resident 6 hours or Less $ 292 x ≤ 6 Hours $ 292 $ - 0.00%

Page 34 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
Resident all day $ 585 x Day $ 585 $ - 0.00%
Scoreboard Operator Actual Cost Each To capture Staff time Actual Cost N/A N/A Sports Field Lighting $ 38 x Hour 2 hour minimum $ 38 $ - 0.00% 10 Pickleball Lessons
Private Lessons $ 69 x Each $ 69 $ - 0.00%
Semi Private Lessons $ 45 x Each $ 45 $ - 0.00%
Private Group Lessons $ 33 x Each $ 33 $ - 0.00%
11 Pickleball Instruction Drills $ 21 x Each $ 21 $ - 0.00% 12 Pickleball League $ 39 x Each $ 39 $ - 0.00%
13 Pickleball Clinic Instructions
Clinic One-Day $ 33 x Each $ 33 $ - 0.00%
Clinics $ 118 x Each $ 118 $ - 0.00%
14 Pickleball Tournament Round Robin
Individual $ 55 x Each $ 55 $ - 0.00%
Team $ 33 x Each $ 33 $ - 0.00%
E-85 City Youth Programs and Activities
1 Non-Resident Fee $ 10 Each Added to all resident fees below $ 10 $ - 0.00% 2 City Youth Flag Football Program - Resident $ 56 Each $ 56 $ - 0.00% 3 City Youth Softball Program - Resident $ 56 Each $ 56 $ - 0.00% 4 City Youth Basketball Program - Resident $ 56 Each $ 56 $ - 0.00% 5 City Youth Volleyball Program - Resident $ 56 Each $ 56 $ - 0.00% 6 Youth Sports Tournament - Resident 50% of Costs To recover 50% of tournament costs 50% $ - 0.00% 7 Cross Country Event - Resident
Pre-Registration $ 3 Each $ 3 $ - 0.00%
Late Registration $ 4 Each $ 4 $ - 0.00%

Page 35 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
8 Youth Sports Clinics - Resident $ 24 x per Player
per Clinic $ 24 $ - 0.00%
9 Various Youth Excursions - Resident 50% of Costs
To recover 50% of excursion costs - a $1 per minute late fee will be charged (up to 15 minutes) will be added if a child is not picked up by closing time
50% $ - 0.00%
10 MLK Youth Day Camp - 7 Week Program -
Resident $ 58 Each $ 58 $ - 0.00%
11 Youth Day Camp - 7 Week Program -
Resident $ 142 Each $ 142 $ - 0.00%
12 Youth Day Camp Cancellation Fee $ 8 Each $ 8 $ - 0.00% 13 High School Summer Leagues - Resident $ 10 x per Player per Activity $ 10 $ - 0.00%
14 In-Line Hockey - Resident $ 78 x per Player $ 78 $ - 0.00% 15 Youth Tee Ball - Resident $ 58 x per Player $ 58 $ - 0.00% 16 Special Event Fee - Resident $ 3 x per Player $ 3 $ - 0.00% 17 Pee Wee Sports - Resident $ 45 x per Player $ 45 $ - 0.00% 18 Party Mobile - Resident $ 103 x per Player Program services to community $ 103 $ - 0.00% 19 Silver Creek After School Program (until 5PM)
- Resident $ 31 x Week $ 31 $ - 0.00%
20 Silver Creek After School Program (until 6PM)
- Resident $ 48 x Week $ 48 $ - 0.00%

Page 36 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
21 Silver Creek Youth Camp - Full Day -
Resident $ 146 x Week $ 146 $ - 0.00%
22 Silver Creek Youth Camp - Half Day -
Resident $ 90 x Week $ 90 $ - 0.00%
E-86 Aquatic Programs - Recreational Swimming
1 Non-Resident Fee $ 10 Each Added to all resident fees below $ 10 $ - 0.00% 2 Recreational Swim - Daily - Resident
Silvercreek, MLK and Jefferson (daily) $ 1 x Day $ 1 $ - 0.00% McMurtrey Facility (daily) $ 4 x Day $ 4 $ - 0.00%
3 Recreational Swim - McMurtrey Facility -
Season Pass - Resident $ 55 x per Season $ 55 $ - 0.00% 4 Family Passes - McMurtrey Facility - Resident
Family Day Pass $ 13 x Day For family of 4 $ 13 $ - 0.00% Family Season Pass $ 197 x per
Season For family of 4 $ 197 $ - 0.00%
5 Lap Swim - Resident
Lap Swim Daily - All Pools $ 5 x Day $ 5 $ - 0.00%
Lap Swim - Punch Pass $ 136 Each For 30 pool admissions. Rates have not been increased based on the CPI per Parks program needs. $ 136 $ - 0.00% Lap Swim - Annual Pass $ 459 x Year $ 459 $ - 0.00%
6 Special Aquatic Events - Resident $ 5 x
per
Participant
per Day
$ 5 $ - 0.00%
7 Swim Instructor Training (community rate) Actual Cost Each Actual Cost N/A N/A 8 New Lifeguard Training (community rate) Actual Cost Each Actual Cost N/A N/A 9 Swim Instructor Training (for city workers) $ 88 Each Rates have not been increased based on the CPI per Parks program needs. $ 88 $ - 0.00%

Page 37 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
10 New Lifeguard Training (for city workers) $ 88 Each Rates have not been increased based on the CPI per Parks program needs. $ 88 $ - 0.00%
11 Blended Swim Instructor Training (for city
workers) $ 56 Each $ 56 $ - 0.00%
12 Blended New Lifeguard Training (for city
workers) $ 56 Each $ 56 $ - 0.00%
13 Swim Clinic - Resident $ 126 Each $ 126 $ - 0.00%
14 Swimming Lessons - Resident
Swim Lessons $ 58 Each $ 58 $ - 0.00%
Discounted Swim Lessons $ 5 Each $ 5 $ - 0.00%
Competitive Swimming - All pools $ 95 Each $ 95 $ - 0.00% 15 Pool Party Rental - All Pools (except
McMurtrey) - Resident
Pool Party Rental - All Pools (except
McMurtrey) - Resident
$ 145 x Hour
Minimum 2.5 hours. Fee for up to 200 guests. Max
Capacity at pool parties (except McMurtrey is not to
exceed 200
$ 145 $ - 0.00%
Additional Fee When Guests Exceed 100 or
Toddler Pool $ 16 x Hour $ 16 $ - 0.00%
16 Pool Party Rental - Recreational Pool -
McMurtrey Facility - Resident
Pool Party Rental - McMurtrey Facility $ 318 x Hour Minimum 2.5 hours. Fee for up to 300 guests. Max capacity at this pool is not to exceed 300. $ 318 $ - 0.00% Additional Fee When Guests Exceed 200 $ 16 x Hour $ 16 $ - 0.00% 17 Pool Party Rental - 1/3 of Competitive Pool -
McMurtrey Facility- Resident $ 147 x Hour Minimum 2.5 hours. Rental must be in conjunction with McMurtrey Recreational Pool $ 147 $ - 0.00% 18 Certified Users (except McMurtrey) - Resident
Certified Users (except McMurtrey) $ 86 x Hour $ 86 $ - 0.00% Heating Costs (when pools are heated by
request) Actual Cost Each Actual Cost N/A N/A
19 Certified Users - McMurtrey - Resident $ 172 x Hour Competitive pool - no lifeguards provided $ 172 $ - 0.00%

Page 38 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
20 Onsite Merchandise Sales Actual Cost Each Actual Cost N/A N/A 21 Parent & Me Pool Time at McMurtrey Facility $ 6 Each $ 6 $ - 0.00% E-87 Leisure Classes
1 MLK Leisure Classes - Residents $ 5 Each $ 5 $ - 0.00% 2 MLK Leisure Classes - Non-Residents $ 7 Each $ 7 $ - 0.00% E-88 Amphitheatre Fees - The Park at River Walk
*Facility Rental Fees are subject to the following
adjustments:

1. Non-Profit Rate (Pre-approval required): 25% discount on the base reservation fee is available to qualifying non-profit organizations. Eligibility must be verified with proof of 501(c) (3) status and a Tax ID number, along with
Recreation and Parks department approval. Field rentals, Program fees, Miscellaneous and Amenity Fees are
exempt from this rate.

2. Commercial Rate: Commercial or for-profit events are subject to a surcharge fee of 25% above the base rental fee, and an additional fee of up to 10% of gross event
revenue. An event is subject to the commercial rate when they meet one or more of the following criteria (qualifying non-profits exempt): the group is charging admission to the event or is selling a product or a service at the event. 1 Ticketed Events - Base Rent $ 2,662 Each $ 2,662 $ - 0.00% 2 Non-Ticketed Events - Base Rent $ 1,597 Each $ 1,597 $ - 0.00% F-90 Hearings and Appeals
1 Appeal (other than planning) $ 518 Each i.e., cabaret, taxi, fireworks, etc. $ 518 $ - 0.00% 2 Appeal with Mailed Notice & Publication $ - Each $ - $ - N/A F-91 Water Resources Fees
F - Miscellaneous Fees

Page 39 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
1 Fire Hydrant Distribution and Installation
Inspection
Operating, Maintenance and Replacement
Fee
$ 3,099 Each
Fee has not had a full cost recalculation since 2017, the cost of labor and materials has drastically changed during this time.
$ 3,099 $ - 0.00%
Hydrant Flow and Testing (CalWater service
area)
$ 151 Each
Fee has not had a full cost recalculation since 2017, the cost of labor and materials has drastically changed during this time.
$ 151 $ - 0.00%
Hydrant Flow and Testing (Oustide CalWater
service area)
$ 386 Each
Fee has not had a full cost recalculation since 2017, the cost of labor and materials has drastically changed during this time.
$ 386 $ - 0.00%
After Hours Testing (CalWater service area) $ 139 Each $ 139 $ - 0.00% After Hours Testing (Oustide CalWater
service area) $ 428 Each $ 428 $ - 0.00%
2 Fire Service Inspection $ 674 Each $ 674 $ - 0.00%
3 Domestic Water System and Fire Service
Plan Check $ 872 Each $ 872 $ - 0.00%
F-92 Document Imaging
1 Document Imaging Fee - Maps and Specs -
Public Works $ - x Page This fee is recommended for removal as it is no longer functional. $ - $ - NA 2 Large Document Imaging Fee - Planning
0 - 50 Pages No Charge Each No Charge N/A N/A
51 - 100 Pages $ 15 Each $ 15 $ - 0.00%
101 - 200 Pages $ 37 Each $ 37 $ - 0.00%
201 - 300 Pages $ 53 Each $ 53 $ - 0.00%
301 and Greater Pages $ 75 Each $ 75 $ - 0.00%
F-93 Processing School Facility Fees
1 Processing School Facility Fees $ 10 Each $ 10 $ - 0.00% F-94 Computer Data
1 Computer Data Actual Cost Each Actual Cost N/A N/A

Page 40 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
F-95 Economic Development Fees
1 Fair Housing Workshop Fee $ 426 Each $ 426 $ - 0.00%
F-97 Return Check Charge
1 Return Check Charge $ 15 Each $ 15 $ - 0.00%
F-98 City Council Chamber Rental
1 City Council Chamber Rental $ 397 Each $ 397 $ - 0.00% F-99 Broadcast Charges for City Council Chambers
1 Equipment Charges
Video Presentation System $ 63 x Hour $ 63 $ - 0.00%
Broadcasting Equipment $ 162 x Hour $ 162 $ - 0.00%
2 Staff Charges Actual Cost Each Actual Cost N/A N/A
3 Tape Duplication Actual Cost Each Actual Cost N/A N/A F-100 Business License Processing Fees
1 Initial Business License Processing
City of Bakersfield Fee $ 10 Each $ 10 $ - 0.00%
State Surcharge $ 4 Each Fee set by State of California, 10% remitted to State quarterly $ 4 $ - 0.00%
2 Renewal Business License Processing
City of Bakersfield Fee $ 5 Each $ 5 $ - 0.00%
State Surcharge $ 4 Each Fee set by State of California, 10% remitted to State quarterly $ 4 $ - 0.00%
F-101 Food Vending Vehicle Fees
1 Vehicle on Public Right-of-Way $ 53 per Year $ 53 $ - 0.00% 2 Vehicle on Private Property $ 321 per Year $ 321 $ - 0.00% F-102 Blue Star Military Banner Program

Page 41 of 42 ends

2/1/2027 Unit / 7/1/2026 Proposed Proposed
Proposed Additional Adopted $ Increase %Increase
Fees Fee Notes/Comments Fees (Decrease) (Decrease)
Center
Number
City of Bakersfield
Proposed Master Fee Schedule for 2026-27
For City Service Centers
1 Blue Star Military Banner Program $ 233 Each $ 233 $ - 0.00% F-103 Development Services
1 Document Processing and Maintenance Fee $ 7 Each Gradual increase to reach the full cost recovery amount over time. $ 7 $ - 0.00%
* Refund for Fee is Limited to 3 Years per Resolution

Page 42 of 42 ends

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent Calendar - Public Hearings TO: Honorable Mayor and City Council
FROM: Phillip Burns, Development Services Director
DATE: November 6, 2026
SUBJECT: Public Hearing on Behalf of the Housing Authority of the County of Kern and Approval of Loan Agreement
for the Rehabilitation of Village Park Senior Apartments.

1. Conduct a public hearing as required by Section 147(f) of the Internal Revenue Code of 1986 to receive comments relating to the plan of finance for the issuance by the Housing Authority of the County Kern (“Authority”) of Multifamily Housing Revenue Bonds in the amount not to exceed ($6,000,000) of the Authority’s Revenue Bonds (Bonds) for the purpose of financing rental housing projects.

2. Adopt Resolution approving the plan of finance for the issuance by the Housing Authority of Multifamily Housing Revenue Bonds in an amount not to exceed ($6,000,000) for the rehabilitation of the project known as Village Park Senior Apartments, a 59-unit affordable housing complex located at 2300 R Street in Bakersfield California and certain other matters relating thereto.

3. Approve the Indemnification Agreement between the City of Bakersfield and the Housing Authority of the County of Kern

4. Approve the Loan Agreement between the City of Bakersfield and GEAHI Village Park LP to fund the rehab of Village Park Senior Apartments with Bakersfield Affordable Housing Trust funds.
(Ward 2)
RECOMMENDATION:

Staff recommends that the City Council conduct a public hearing, adopt a Tax Equity and Fiscal Responsibility Act (TEFRA) Resolution, approve the indemnification agreement and approve the loan agreement for the rehabilitation of affordable housing.

BACKGROUND:

Village Park Senior Apartments, located at 2300 R Street in Bakersfield, is an existing affordable housing development originally constructed in 2009 with financial assistance from the City of Bakersfield. The development consists of 59 affordable housing units reserved for low-income seniors earning between 30% and 60% of the Area Median Income (AMI). As a condition of the City’s original funding assistance, the development was subject to a 20-year Regulatory Agreement requiring units to remain affordable through 2029.

TEFRA Hearing
The City of Bakersfield (City) has received a request from the Housing Authority of the County of Kern (Authority) to conduct a public hearing, as required by the Internal Revenue Code, in order to issue, pursuant to a plan of finance, one or more series of its tax-exempt bonds, notes or other evidence of indebtedness in an amount not to exceed $6,000,000 (the “Bonds”) for the benefit of the Borrower pursuant to Chapter 5 of Division 7 of Title 1 of the Government Code of the State (commencing with Section 6500) (the “Act”), the proceeds of which will be used to provide a loan to finance the acquisition and rehabilitation of Village Park Senior Apartments (the “Project”) located at 2300 R Street.

The Bonds will be tax-exempt private activity bonds for the purposes of the Internal Revenue Code and as such, require the approval of the elected body of the governmental entity having jurisdiction over the location where the project to be financed is located. The city will not be under any obligation to repay the bond indebtedness.

For the Authority to issue such Bonds, the City must: 1) conduct a public hearing allowing members of the public to comment on the proposed Project, and 2) approve the Authority's issuance of Bonds via Resolution. Although the Authority (not the City) will be the issuer of the Bonds for the Project, the financing cannot proceed without the City holding a Public Hearing and approving the issuance of the Bonds.

The Authority will issue the Bonds for the benefit of the Project. No financial obligations are placed on the City for project financing costs or repayment of the Bonds.

Affordable Housing Rehabilitation Project
Golden Empire Affordable Housing, Inc., through GEAHI Village Park LP, has requested financial assistance from the City’s Affordable Housing Trust Fund (AHTF) to rehabilitate the existing development. The proposed rehabilitation project has an estimated total cost of $3,744,000 and includes replacement of the existing heating, ventilation, and air conditioning (HVAC) systems, installation of new flooring throughout all units, interior repainting, and landscaping improvements.

These improvements are intended to enhance resident comfort and safety while preserving the quality of the existing affordable housing development.

To support the proposed rehabilitation, the City proposes to provide a low-interest loan in the amount not to exceed $1,500,000 from the AHTF. The loan will carry a 3% annual interest rate with a 55-year repayment term, with annual repayments based on the City’s 50% share of residual receipts. As part of the Loan Agreement, all 59 units will remain subject to affordability restrictions for an additional 20 years following project completion, ensuring the continued availability of affordable housing for low-income seniors.

FISCAL IMPACT: The tax-exempt revenue bonds are payable solely out of the revenues derived by the Housing Authority from the applicable Project. No financial obligations are placed on the City for project financing costs or debt repayment. The loan for the rehab is from PSVS funds invested in the Bakersfield Affordable Housing Trust Fund for affordable housing.

COUNCIL GOAL:

Economic Opportunity for All
ATTACHMENTS:

1. TEFRA Resolution

2. TEFRA Indemnification Agreement

3. Loan Agreement

Page 1 of 3 ends

RESOLUTION NO. ____________

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BAKERSFIELD

APPROVING A PLAN OF FINANCE FOR THE ISSUANCE BY THE HOUSING

AUTHORITY OF THE COUNTY OF KERN OF MULTIFAMILY HOUSING
REVENUE BONDS (NOT TO EXCEED $6 MILLION) FOR THE ACQUISITION AND REHABILITATION OF A 60-UNIT AFFORDABLE SENIOR HOUSING

PROJECT KNOWN AS VILLAGE PARK SENIOR APARTMENTS LOCATED AT 2300 R STREET IN THE CITY OF BAKERSFIELD.

WHEREAS, the Housing Authority of the County of Kern (the “Authority”) is authorized pursuant to the provisions of Chapter 1 of Part 2 of Division 24 of the California Health and Safety Code to issue revenue bonds for the purpose of financing rental housing projects; and
WHEREAS, the Authority proposes to undertake a plan of finance to issue its multifamily housing revenue bonds in one or more series from time to time in an aggregate principal amount not to exceed $6,000,000 outstanding at any one time (the “Housing Authority Bonds”) for the purpose of financing the acquisition and rehabilitation of 60 units of affordable multi-family senior rental housing known as Village Park Senior Apartments, located at 2300 R Street, on the corner of R Street and 24th Street between Q Street and Golden State Highway within the City of Bakersfield, California (the “Project”); and
WHEREAS, proceeds from the Housing Authority Bonds are expected to be used to make a loan to Golden Empire Affordable Housing, Inc. (“GEAHI”) Village Park LP, a California limited partnership, the proposed owner and operator of the Project (the “Owner”), the general partner of which includes GEAHI Village Park LLC (controlled by GEAHI), as the managing general partner of the Owner of the Project; and
WHEREAS, the Housing Authority Bonds will be qualified “private activity bonds” for purposes of the Internal Revenue Code of 1986, as amended (the “Code”); and
WHEREAS, pursuant to Section 147(f) of the Code, the proposed plan for the issuance of private activity bonds to finance the Project is required to be approved by the “applicable elected representative” of the governmental unit having jurisdiction over the area in which the facility financed by such bonds is to be located, after a public hearing held following reasonable public notice (collectively, the Tax Equity and Fiscal Responsibility Act “TEFRA Actions”); and WHEREAS, the Project is located in the City of Bakersfield (“City”) and the members of the Bakersfield City Council (“City Council”) are the applicable elected representatives of the City; and

Page 2 of 3 ends

WHEREAS, Pursuant to Internal Revenue Code Section 147f, there has been published, at least 7 days prior to the date hereof, on the City website, a notice that a public hearing regarding the plan for the proposed issuance of the Bonds would be held on the date hereof; and
WHEREAS, such public hearing was conducted on the date hereof by this City Council, at which time an opportunity was provided to interested parties to be heard with respect to the proposed plan for the issuance of the Housing Authority Bonds and financing of the Project; and
WHEREAS, the City shall not have any liability for the repayment of the Housing Authority Bonds or any responsibility for the Project; and WHEREAS, it is intended that this resolution shall constitute the approval of the proposed plan for the issuance of the Housing Authority Bonds required by Section 147(f) of the Code.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Bakersfield as follows:

1. The City Council finds and declares that the foregoing recitals are true and correct and are incorporated herein by reference.

2. Approval of Plan of Finance for the Issuance of Housing Authority Bonds.

This City Council hereby approves the proposed plan for the issuance of the Housing Authority Bonds by the Authority for the purposes of financing the Project. It is the purpose and intent of this City Council that this resolution constitutes approval of the proposed plan for the issuance of the Housing Authority Bonds for the purposes of Section 147(f) of the Code.

3. No City Liability for Housing Authority Bonds. The issuance of the Housing Authority Bonds shall be subject to the approval by the Authority of all financing documents relating thereto to which the Authority is a party. The City shall have no responsibility or liability whatsoever with respect to the Housing Authority Bonds.

4. No City Responsibility for Project. The adoption of this resolution shall not obligate the City or any department thereof to:
i. Provide any financing to acquire, rehabilitate, or otherwise finance the Project or any refinancing of the Project, as a result of the TEFRA Actions;

Page 3 of 3 ends

ii. Approve any application or request for or take any other action in connection with any planning approval, permit, or other action necessary for the acquisition, construction, or operation of the Project;
iii. Make any contribution or advance any funds whatsoever to the Authority; or
iv. Take any further action with respect to the Authority, its issuance of the Housing Authority Bonds, or its acquisition, rehabilitation, or operation of the Project.

5. Effective Date. This resolution shall take effect immediately upon its passage.

I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on _________________________ by the following vote:

AYES: COUNCILMEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER _______________________________________________________________ ABSTAIN: COUNCILMEMBER _______________________________________________________________ ABSENT: COUNCILMEMBER _______________________________________________________________ ______________________________________

JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED ______________
By: _________________________________________

KAREN GOH
Mayor
APPROVED AS TO FORM:

By: _________________________________________

VIRGINIA GENNARO
City Attorney

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent -Hearings TO: Honorable Mayor and City Council
FROM: Phillips Burns, Development Services Director
DATE: November 6, 2026
SUBJECT: Continued Public Appeal Hearing of Planning Commission’s Approval of Vesting Tentative Tract Map No. 7451 (Phased) and its Mitigated Negative Declaration.

McIntosh & Associates, representing Diamond Farming Company, is proposing to subdivide 40.77 acres into 313 single-family residential lots, 1 multi-use trail lot, and 1 park lot in the R-2 (Small Lot Single-Unit Dwelling) zone located generally southeast of Olive Drive and Santa Fe Way. (Ward 4) Consideration of a Resolution adopting the Mitigated Negative Declaration pursuant to the California Environmental Quality Act and approving Vesting Tentative Tract Map No. 7451 (Phased).

The Sierra Club submitted an appeal to the Planning Commission’s approval of the request. Sierra Club and McIntosh & Associates are requesting additional continuance RECOMMENDATION:

City staff recommends continuing the appeal hearing to the regularly scheduled meeting on January 20, 2027.

BACKGROUND:

Project Description. Vesting Tentative Tract Map (VTTM) No. 7451 consists of 313 single-family residential lots, 1 multi-use trail lot, and 1 park lot on 40.77 acres. Residential lots range in size from 3,440 square feet to 3,600 square feet, with the typical lot size 40 feet wide x 86 feet deep (3,440 square feet). The density is 8.65 units per net acre, which is consistent with the LR designation of the project of less than or equal to 7.26 dwelling units per net acre.

Access to this subdivision would be from Firridge Way (local) on the east boundary and Poplar Spring Avenue (local) on the subdivision's south boundary. As such, the applicant has requested 8 deviations from City standards to allow a storm drain that collects runoff from Olive Drive through Lot 116, a 300- foot radius on a local street where 500 feet is required, reduction of lot frontage, reduction of lot width, reduction of lot depth, double frontage lots, allow clear sight view, and allow traffic calming measures installed on block lengths for local streets. Staff has reviewed deviation requests and recommends approval.

City Council Continuance. The project was scheduled to be heard at the regularly scheduled City Council meeting on August 26, September 16, October 21, and November 18, 20265. The item was opened on August 26th and continued to the September 16, 2026 City Council meeting. The applicant/developer requested that these hearings be continued because they stated they may be settling the matter with the appellant, the Sierra Club, which would result in the withdrawal of the appeal. The appellant agreed to continuance to the January 20, 2027 hearing.

Planning Commission Decision. On June 4, 2026, the Planning Commission considered VTTM No. 7451 (Phased). Three comment letters were received related to the proposed Mitigated Negative Declaration (MND). At the meeting, there were five speakers in favor and no speakers in opposition to the map. The Planning Commission unanimously approved the request with Vice Chair Martin and Commissioner Kaur absent. The Planning Commission’s findings are contained in Resolution No. 55-26 (attached).

Appeal to Planning Commission’s Decision. On June 9, 2026, the Sierra Club filed an appeal to the Planning Commission’s decision to approve VTTM No. 7451 (Phased). A copy of the appeal letter is attached. The appeal letter dated June 9, 2026 references the Sierra Club letter dated March 9, 2026 submitted to the Planning Commission that states the City does not adequately address concerns regarding cumulative climate change and air pollution impacts, habitat loss, and affordable housing requirements.

The applicant’s consultants submitted responses to the Sierra Club letter of March 9, 2026 (attached) and responded to the Sierra Club’s comments. Based on the information provided, no additional environmental review is required.

Environmental Review. Based upon an initial study, Staff determined the proposed project, with mitigation, would not have a significant effect on the environment. Therefore, a Mitigated Negative Declaration (“MND”) was prepared for this project in accordance with the California Environmental Quality Act (“CEQA”). The MND was circulated for public and agency review from February 5, 2026, to March 9, 2026. The following special studies were submitted: biological resources, cultural resources and air quality analysis.

Public Notification. All required public notices have been given for both the Planning Commission public hearing held on June 4, 2026, and the City Council public hearing of August 26, 2026.

CITY COUNCIL OPTIONS:

The City Council may sustain, modify, reject, or overrule any ruling of the Planning Commission for this subdivision of land. The following options have been provided for Council’s consideration regarding the appeal:

1. Continue the public hearing to the regularly scheduled City Council meeting of January 20, 2027.

2. Deny the Appeal and Approve VTTM No. 7451 (Phased). If the City Council were to deny the appeal and uphold the Planning Commission's approval, the Vesting Tentative Tract Map would be conditionally approved and would facilitate construction of 313 single-family residential lots, 1 multi-use trail lot, and 1 park lot on 40.77 acres and adopt the Mitigated Negative Declaration (Resolution attached).

3. Approve the Appeal and Deny VTTM No. 7451 (Phased). If the City Council were to approve the appeal and overturn the Planning Commission's approval, the project site could not be developed as proposed and would retain its current condition. The Mitigated Negative Declaration would not be adopted.

CONCLUSION:

Both the applicant and the appellant have requested an additional continuance to January 20, 2027 in order to conclude discussions and resolve the matter. Staff’s position is that the proposed subdivision of land is consistent with applicable general and specific plans; the site is physically suitable for the type of development; the design of the subdivision is not likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat; the design of the subdivision will not likely cause serious public health problems; and the design of the subdivision will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision.

Overall Recommendation. Staff finds that the applicable provisions of CEQA have been complied with, and the proposal is compatible with the surrounding area, land use designation, and zoning ordinance.

Therefore, staff recommends City Council to consider the whole of the record, to include the appellant’s concerns, and deny the appeal and uphold the Planning Commission's decision to approve Vesting Tentative Tract Map No. 7451 (Phased).

FISCAL IMPACT:

No fiscal impact with the proposed subdivision of land. Development which will occur as a result of Vesting Tentative Tract Map No. 7451 (Phased) will be subject to the appropriate application processing fees that have been determined to be sufficient to cover all operational expenses related to processing projects.

COUNCIL GOAL:

Community Character & Quality of Life
Reliable Infrastructure

ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Hearings TO: Honorable Mayor and City Council
FROM: Zachary Meyer, Public Works Director
DATE: October 19, 2026
SUBJECT: Public Hearing to present Findings and Consider Adoption of Energy Savings Performance Contract with Willdan Energy Solutions for Public Works Fleet Electrical Charging Infrastructure:

1. Resolution making findings and authorizing an Energy Savings Performance Contract for fleet electrification and electric vehicle infrastructure improvements.

2. Agreement with Willdan Energy Solutions for an amount not to exceed $19,922,436 to implement energy efficiency measures, operating cost-saving measures and equipment, and energy generation measures supporting the City’s transition to an electric fleet.

3. Appropriate $4,662,996 from the Equipment Fund, $8,263,243 from the Solid Waste Fund, $4,346,005 from the Wastewater Fund, and $1,650,192 from the Domestic Water Fund, for a total appropriation of $18,922,436 into the Public Works Capital Improvement Program Budget.

RECOMMENDATION:

Staff recommends opening the public hearing, taking public testimony, adoption of the resolution, approval of the contract, and appropriation of funds.

BACKGROUND:

For the last two to three years, the California Air Resources Board (CARB) has begun to implement new fleet equipment requirements as part of its Advanced Clean Fleet (ACF) program. These requirements mandate that equipment, used by public agencies, must transition to Zero Emission Vehicles (ZEV). CARB placed milestones that public agencies must adhere to as shown below:

Percentage of vehicles that must be ZEVs 10% 25% 50% 75% 100% Group 1: Box trucks, vans, buses with two axles, yard
tractors, light-duty package delivery vehicles
2025 2028 2031 2033 2035 and
beyond
Group 2: Work trucks, day cab tractors, pickup trucks,
buses with three axles
2027 2030 2033 2036 2039 and
beyond
Group 3: Sleeper cab tractors and specialty vehicles 2030 2033 2036 2039 2042 and beyond
Additionally, CARB has adopted rules that allow it to penalize agencies up to $10,000 per day for non-compliance and allow the DMV to withhold new vehicle registration for non-compliance. This means if the City ignores these CARB mandates, the City could face excessive penalties and lose the ability to place new equipment into service as the DMV would withhold registrations.

To comply with these requirements, electric charging stations would need to be installed at City facilities to provide fuel for its new zero-emission fleet. With regards for this project (to install charging infrastructure), City staff determined that a traditional planning – design – bid – build project process would not be the best solution for project delivery. The planning phase for the project is critical and time consuming due to: studying the current electrical infrastructure at all City sites that have equipment; analyze City’s equipment and replacement cycle; analyze equipment fuel usage; and investigate incentives and grant opportunities, which are time-sensitive. If staff were to solicit a contractor to focus solely on the planning phase, most qualified professionals would not submit a proposal as they would wait for the construction phase. A contractor who completed the planning phase would be ineligible to bid for the construction phase and the construction phase would yield the most profits for contractors. Staff determined the best project delivery process would be to have one consultant/contractor perform the planning, design, and construction. To accomplish this, staff would procure an energy contractor, complete an investment grade audit (IGA) for electric charging infrastructure, and award a construction contract via public hearing utilizing California Government Code section 4217.10 et seq., which authorizes an alternative method for public agencies to enter into certain “energy service contracts.” On July 31, 2024, the Public Works Department issued a Request for Qualifications (RFQ) seeking qualified Energy Services Companies (ESCOs) to conduct IGAs, identify and develop energy efficiency improvements, and potentially implement capital improvement projects at City facilities using a design-build delivery method. Eight proposals were received. A selection committee evaluated the proposals using the criteria established in the RFQ, including approach, experience, references, qualifications, and overall proposal quality. Three firms: ENGIE Services U.S. Inc., Noresco LLC, and Willdan, were shortlisted and participated in oral appraisal interviews on October 24, 2024. Willdan received the highest score of (91.25) and was selected. Willdan began working on a preliminary evaluation of City facilities, and then City Council awarded a contract (Agreement 2025-106) on June 25, 2025, to complete an IGA of City facilities for the installation of electric vehicle charging stations.

Willdan evaluated 21 City-owned sites to design and build the electrical equipment charging infrastructure. Initially, the goal was to future-proof every site to eventually install enough chargers to allow the City to obtain 100% ACF compliance through all the milestone dates going to year 2042. Due to the excessive costs and the need to finance the project with this approach, Willdan reduced the overall scope of the project and targeted enterprise-funded sites, the corporation yard, and one facility in the downtown area. Electric chargers are being proposed to be installed at the following sites (percentage of fund allocated to each site is also shown):
 1530 Eye Street (City Hall South Annex parking area; 100% General Fund)  4101 Truxtun Avenue (Corporation Yard)
o Parcel A (53% General Fund / 47% Refuse Fund)
o Parcel C (7% General Fund / 93% Refuse Fund)
 6901 McCutchen Road (Wastewater Treatment Plant No. 3; 100% Sewer Enterprise)  1700 East Planz Road (Wastewater Treatment Plant No. 2; 100% Sewer Enterprise)  2601 Mt. Vernon Avenue (Greenwaste Site; 100% Refuse Enterprise)  2260 South Union Avenue (Materials Recovery Facility; 100% Refuse Enterprise)  1000 Beuna Vista Road (Water Department; 100% Domestic Water Enterprise) Collectively, there will be 133 charging ports installed across these sites, and 136 make-ready ports to allow for future growth. With this approach, the City will gain ACF compliance through 2033 for Group 1 and Group 2 equipment, and compliance through 2036 for Group 3 equipment.

Safety equipment, such as emergency equipment used by the Police and Fire Department, is currently exempt from the ACF mandates.

Additionally, Willdan assisted the City with enrolling in PG&E’s Fleet Electric Vehicle Program. This program allows PG&E to upgrade their infrastructure to-the-meter at no cost to the City (similar to the PG&E Rule 20 Program) and comes with rebates, in the amount of $1.572 Million Dollars, for installing the chargers. In order for the City to stay enrolled in the PG&E EV Program, a contract must be awarded prior to December of this year. Consequentially, the City would lose the rebate money if a contract is not awarded prior to December of this year. This is because PG&E wants to ensure the construction can be completed by the end of 2028, and PG&E would enroll another agency into the program if it believes the City cannot meet these construction deadline goals.

Item 1 – Adopting Resolution showing there are energy savings To comply with California Government Code section 4217.12, Willdan must show that by completing this project, there will be energy savings. Willdan has successfully shown this through their IGA and delivered to the City its Summary of Findings. These fundings identify maintenance savings, clean air credits, PG&E rebates, and energy savings from using less unleaded/diesel fuels. The summary of findings is attached to the resolution as Exhibit A.

The Summary of Findings shows overall savings to the City in the amount of just over $26,000,000 over a 20-year period with a return-on-investment (ROI) by year 2039. When the cost to replace the City’s vehicles and equipment is factored in over a 20-year period, the 20-year savings is reduced by 8.8 Million Dollars; but there is still positive cash flow. Other factors included in the 20-year cash flow model:
assumed maintenance savings, forecasting electrical costs and fuel savings, Low Carbon Fuel Standard credits, vehicle/equipment replacement incentives, PG&E rebates, and charger maintenance. The 20-year cashflow model for all eight sites is attached as a support document.

A 20-year period was used in the model as the ACF milestones run through the next 15 years, and the life of the chargers are assumed to be 10 years. The replacement costs of the chargers, after ten years, is factored in the cash flow models. By showing a 20-year window for this program, the capital costs for the new chargers and replacement chargers can realize their useful life and show their entire benefit to the City in reducing fuel costs.

The summary of findings also shows a negative cash flow over the same 20-year period for the Water and Sewer funded sites. This is because there is not as much equipment at these sites, and the fuel usage isn’t as excessive as the equipment that is housed at the corporation yard. The higher the fuel usage, the greater the savings that can be realized. These sites still need chargers to comply with the ACF mandates, and having chargers at these site will geographically benefit other Departments who need to charge their equipment near these sites. Since all sites collectively show a positive cash flow and energy sites, this project does comply with California Code 4217.

In accordance with California Government Code Sections 4217.10–4217.18, the findings of the Investment Grade Audit demonstrate that the anticipated cost to the City to implement the proposed energy-related improvements will be less than the anticipated marginal cost to the City for electrical or other energy that would have been consumed in the absence of the improvements.

Item 2 – Approving agreement with Willdan
This agreement with Willdan will install electric chargers at eight City locations. Willdan expects to have its construction completed prior to the end of calendar year 2027, which will allow PG& E sufficient time to complete their to-the-meter improves prior to the end of calendar year 2028. This contract is for a not-to-exceed amount of $19,922, 436. This contract includes contingencies and this not-to-exceed amount is written as the Guaranteed Maximum Price (GMAX); meaning the total project costs cannot exceed this amount absent a City-authorized increase. Unless the City desires Willdan to complete additional duties outside of the defined scope of work, there will be no future change-orders. This contract also covers the maintenance and networking fees of the electric chargers for 5 years.

The agreement will also include provisions for Measurement and Verification (M&V) to document and verify the energy and energy-related cost savings achieved by the project. During the applicable guarantee period, Willdan and its contractor will be responsible for tracking and monitoring system performance and preparing savings reports in accordance with the contract requirements. This process will allow City staff to compare actual savings against the projected savings and evaluate whether the project is meeting the performance guarantees established in the agreement. Willdan is guaranteeing $331,000 in energy savings to City for year 1 of this program. If the City does not realize these savings, Willdan will compensate the City the shortfall amount, and be required to continue monitoring the system for energy savings.

FISCAL IMPACT:

Item 3 – Appropriation of funds
The project has a capital cost of $19,922,436. Approximately $1,000,000 from the Equipment Fund is currently budgeted in the Public Works Capital Improvement Program in Project 26PWFL01; a project for electric vehicle chargers. An additional appropriation of funds is necessary to award the contract, in the amount of $18,922,436, from multiple funding sources as follows:

1. $4,662,996 from the Equipment Enterprise Fund

2. $8,263,243 from the Refuse Enterprise Fund

3. $4,346,005 from the Sewer Enterprise Fund

4. $1,650,192 from the Domestic Water Enterprise Fund
The costs associated with each funding source is based on the construction costs and quantity of chargers that are being installed for equipment that is funded within each enterprise. For General Fund chargers, the Equipment Fund will purchase those chargers, and the using Departments will pay back the equipment over the life of the charger (approximately 10 years) for the capital costs.

COUNCIL GOAL:

Innovative and Efficient City Government
Reliable Infrastructure
ATTACHMENTS:

1. Resolution (with Exhibit A – Summary of Findings)

2. Agreement

3. 20-Year Cash Flow Model

Page 1 of 3 ends

RESOLUTION NO.

MAKING FINDINGS REQUIRED UNDER
GOVERNMENT CODE SECTION 4217.10 TO
4217.18, AUTHORIZING CITY OF BAKERFIELD

TO ENTER INTO AN ENERGY SAVINGS

PERFORMANCE CONTRACT WITH WILLDAN

ENERGY SOLUTIONS FOR EFFICIENCY AND
INFRASTRUCUTRE IMPROVEMENTS PROJECTS.

WHEREAS, City of Bakersfield (“City”) selected Willdan Energy Solutions (“Willdan”) through a competitive Request for Qualifications (“RFQ”) process to support City with energy conservation design-build services; and WHEREAS, on June 25, 2025, City and Willdan entered Agreement No. 2025- 106 the purpose of which was for Willdan to conduct an Investment Grade Audit (“IGA”) of City’s Public Works Department Fleet and Fleet Infrastructure with aim to facilitate advancement in fleet transition to Zero Emission Vehicles, and WHEREAS, Willdan has completed the IGA, which includes an in-depth analysis of the financial aspects of energy savings and return on investment from changes or upgrades to City facilities that are in alignment with addressing core infrastructure needs and efficiency improvements; and
WHEREAS, the scopes of work identified in the Energy Savings Performance Contract (“ESPC”) are a result of recommendations from the IGA, which prioritizes measures that include time-restricted incentives for equipment and upgrades based to various systems; and
WHEREAS, California Government Code Sections 4217.10 to 4217.18, authorizes City to enter into a ESPC for the implementation of energy-related improvements if the Council finds that is in the best interest of City to enter into such agreement and that the anticipated cost to the City for electrical energy or conservation services provided by Willdan under the contract will be less than the anticipated marginal cost to City of the electrical energy that would have been consumed by City in the absence of the actions contemplated in the ESPC; and WHEREAS, the anticipated cost to City for electrical energy or conservation services provided under the ESPC will be less than the anticipated marginal costs of City of electrical energy that would have been consumed by City in the absence of the implementation of the improvements under the ESPC; and WHEREAS, the total cost of the Project is $19,922,436 and if all measures are

Page 2 of 3 ends

constructed, the anticipated lifetime (20-year) incentives and savings are outlined in Summary of Findings, attached as Exhibit A; and WHEREAS, staff has identified funding within the Equipment Fund, Water Fund, Sewer Fund, and Refuse Fund for the capital costs necessary to complete this infrastructure project; and
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:

1. The above recitals are true and correct and incorporated herein by reference.

2. The Council hereby finds that it is in the best interest of City to enter into the Energy Savings Performance Contract.

Page 3 of 3 ends

I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on , by the following vote:

AYES: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCIL MEMBER
ABSTAIN: COUNCIL MEMBER
ABSENT: COUNCIL MEMBER

JULIE DRIMAKIS, CMC
CITY CLERK AND EX OFFICIO of the
Council of the City of Bakersfield

APPROVED
By:

KAREN GOH
Mayor
APPROVED AS TO FORM:

VIRGINIA GENNARO
City Attorney
By:

ASHLEY ZAMBRANO
Chief Assistant City Attorney
COUNTERSIGNED:

By:

RANDY MCKEEGAN
Finance Director
Exhibits: A – Summary of Findings
City of Bakersfield – EV Infrastructure & Fleet
Transition Investment Grade Audit
2033+ ACF Compliance Plan Project
Investment Grade Audit Summary of Findings
I. Project
Overview
The Investment Grade Audit (IGA) was conducted by Willdan for the City of Bakersfield in coordination with Fleet Services, Public Works, Water Resources, Solid Waste, and Wastewater staff. The 2033+ Advanced Clean Fleets (ACF) Compliance Plan Project is the first construction project delivered under the City's Zero-Emission Vehicle (ZEV) Fleet Transition Master Plan. The project will cover eight (8) sites at seven (7) City facilities:

Site Facility City Funding Source
1530 Eye St. South City Hall – Public Works
Annex General Fund
1000 Buena Vista Rd. Water Resources Office Domestic Water Enterprise 2601 S Mt Vernon Ave. Mt. Vernon Green Waste Organics & Recycling Facility Solid Waste Enterprise
2260 S Union Ave. Materials Recovery Facility Solid Waste Enterprise 6901 Mc Cutchen Rd. Wastewater Treatment Plant No. 3 Sewer Enterprise 1700 E Planz Rd. Wastewater Treatment Plant No. 2 Sewer Enterprise 4101 Truxtun Ave. – Parcel A Corporation Yard General Fund, Solid Waste & Sewer
4101 Truxtun Ave. – Parcel C Corporation Yard General Fund, Solid Waste & Sewer
Scope
Design, procurement, and installation of electric vehicle charging station (EVCS) infrastructure to support 395 City vehicles and equipment, including approximately 320 ACF-regulated vehicles:
 133 installed charging ports (63 Level 2, 69 DC fast charging, 1 forklift).

EXHIBIT A - Summary of Findings
 136 make-ready ports (117 Level 2, 19 DC fast) for future chargers without re-trenching or service upsizing.
 New dedicated PG&E electrical services, switchgear, and make-ready infrastructure.  Site civil and parking improvements at 1000 Buena Vista Rd. and 6901 Mc Cutchen Rd.  Five (5) years of charger networking, maintenance, extended warranty,  Register all EVCS with CARB to generate LCFS credits.

Goals

1. ACF Milestone Compliance: Phase infrastructure ahead of vehicle deliveries to meet ACF milestones through 2033 (Groups 1 and 2) and 2036 (Group 3). Avoid penalties of up to $10,000 per day per non-compliant vehicle.

2. Utility and Operating Cost Savings: Replace gasoline, diesel, CNG, and LNG fuel with off-peak electricity on PG&E's BEV-2 rate. Reduce vehicle maintenance costs. Hedge against fuel price volatility.

3. Future-Proof Infrastructure: Install upsized switchgear and make-ready ports now to support long-term fleet growth and avoid future re-work and cost escalation.

4. Leverage Available Funding Sources: Capture time-limited PG&E EV Fleet Program rebates, SJVAPCD Charge Up! vouchers, and ongoing Low Carbon Fuel Standard (LCFS) credit revenue.

II. Core Financial Findings
Project Financial Data
 Guaranteed Maximum Price (GMAX): $19,922,435 (includes 5 years of networking and maintenance SLA).
 Secured Incentives: $1,572,200 ($1,422,200 PG&E EV Fleet Program + $150,000 SJVAPCD Charge Up!).
 Net Project Cost to City: $18,350,235
 Projected Year 1 Net Operational Savings: $1,169,356 ($709,897 avoided fuel, less $329,952 new electricity, plus $514,176 maintenance savings and estimated $394,209 in LCFS credits, less $118,975 charger O&M).
 Guaranteed Year 1 Net Energy Savings: $331,692 (tied to 97% charger uptime).  Program Term: 20 years
 Total Net Operational Savings Over Program Term: $50,473,679 (discounted 2026 $; avoided fuel costs, maintenance costs, and LCFS credits; less electricity and charger O&M).
 Net Program Benefit: $26,387,752 cumulative net present value (2026 $) over the program term; cumulative cash flow turns positive in 2039. Excluding avoided CNG/LNG fueling station capital, the NPV is $22,072,467.
 Annual GHG Reduction: 1,915 metric tons CO2e (216,395 gallons of gasoline equivalent avoided)
Results by Funding Source
City Funding
Source GMAX Cost Incentives Net Cost Year 1 Net Savings 20-yr
Cumulative NPV
Solid Waste
Enterprise $8,263,243 $606,276 $7,656,967 $685,423 $18,713,814 General Fund $5,662,996 $552,959 $5,110,037 $353,270 $9,178,771 Sewer Enterprise $4,346,005 $354,965 $3,991,040 $96,651 ($694,797) Domestic Water
Enterprise $1,650,192 $58,000 $1,592,192 $34,011 ($810,033) Total $19,922,435 $1,572,200 $18,350,235 $1,169,356 $26,387,752 *Corporation Yard costs and incentives are allocated by each fund's share of annual kWh at full electrification.

Conclusion
The anticipated cost to the City under the proposed contract is less than the anticipated marginal cost to the City for fuel, electrical energy, and vehicle maintenance that would have been incurred without these improvements, on a project-wide basis over the 20-year program term.

III. Statutory Basis & Requirements
Statutory Overview (CA GC § 4217.12)
To authorize the project the following must be adequately met:
 Utility Cost Savings: The anticipated cost to the City for the energy services and improvements will be less than the anticipated marginal cost of thermal, electrical, or other energy that would have been consumed by the agency in the absence of those purchases. Avoided gasoline, diesel, CNG, and LNG fuel are the "other energy" baseline for this project.
 Operational Efficiency: The offered energy conservation services and facility alterations are necessary and appropriate for reducing overall utility or operating costs, and for meeting the City's CARB ACF obligations.
 Funding Sufficiency: The project is paid in cash with no financing obligation. Projected savings over the 20-year term exceed the net project cost on a project-wide basis.

Exemptions & Procurement Exemption
This resolution authorizes the exemption from standard formal bidding procedures as permitted under California Government Code Section 4217.10 et seq., recognizing the specialized design-build and energy-saving nature of the procurement.

Public Hearing & Notice Compliance
Notice: Pursuant to GC Section 4217.18, a public notice was posted for two consecutive weeks prior to the public hearing.

Hearing Date: A duly noticed public hearing will be held during the regularly scheduled City Council meeting on November 18, 2026, to receive public comment regarding the proposed project and energy savings performance contract. Approval on this date is required to retain $1,422,200 in PG&E EV Fleet Program incentives.

IV. Action
Approval of resolution to enter into an energy savings performance contract with Willdan for the 2033+ ACF Compliance Plan EV charging infrastructure upgrades at eight (8) City sites.

Page 1 of 70 ends

AGREEMENT NO. _________

ENERGY SAVINGS PERFORMANCE CONTRACT
This ENERGY SAVINGS PERFORMANCE CONTRACT (together with its attached Schedules and Exhibits, this “AGREEMENT”) is made and entered into as of this _________________________, (the “EFFECTIVE DATE”), by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and WILLDAN ENERGY SOLUTIONS, a California corporation with California state contractor’s license number 1065713, authorized to do business in California (referred to herein as “CONTRACTOR”). Each of CONTRACTOR and CITY may be referred to in this AGREEMENT as a “PARTY” and collectively as the “PARTIES.”

R E C I T A L S
WHEREAS, the purpose of this AGREEMENT is for CONTRACTOR to implement energy-savings and efficiency measures, and other operating-cost savings measures, including electric vehicle charging stations and infrastructure to support the CITY’s fleet transition to EV Vehicles, as described in Schedule “A” (SCOPE OF WORK), with respect to the CITY’s facilities, sites, and infrastructure to support electric vehicle charging (the “PREMISES”). This AGREEMENT also sets forth the terms and conditions under which CONTRACTOR will implement such measures, and provide any other services agreed by CONTRACTOR and CITY, all of which will be designed to save energy and operating costs at the PREMISES in connection with the fleet transition to EV Vehicles; and WHEREAS, CITY owns and operates the PREMISES, and is in need of energy-saving equipment at the PREMISES, including electric vehicle charging stations and infrastructure to support the CITY’s fleet transition to EV Vehicles, along with services designed to reduce fleet operational costs; and WHEREAS, CONTRACTOR was selected through a competitive Request for Qualifications process to provide Design-Build Energy Services to the CITY including the development, design, funding facilitation, and implementation of energy conservation, energy efficiency, and related energy capital improvements at the PREMISES, with the aim to facilitate advancements in areas such as fleet transition, zero emissions infrastructure, EV charging facilities, and associated infrastructure that contribute to the CITY’s goals, pursuant to CITY Agreement No. 2025-106; and
WHEREAS, CONTRACTOR has conducted an Investment Grade Audit and Zero Emission Vehicle Master Plan for the CITY (the “IGA”) that includes vehicles and equipment required by the state to transition to electric or other non-carbon

Page 2 of 70 ends

producing equivalents. The IGA includes a detailed analysis of fleet vehicles’ fuel consumption, maintenance costs, operational characteristics, and other related energy criteria for the CITY’s existing fleet and proposed transition to EV Vehicles and charging infrastructure. CONTRACTOR has presented the IGA, on an arm’s length basis, to personnel of CITY with requisite technical training and experience, for those personnel to make judgments and determinations as to the desired scope of work; and
WHEREAS, in the IGA, CONTRACTOR identified potential energy and operational cost savings opportunities in connection with the City’s fleet at the PREMISES and the estimated program costs to implement electric vehicle charging infrastructure, energy-efficiency and operational cost saving measures associated with the EV Vehicle transition and EV charging infrastructure, and presented the findings and deliverables including a Detailed IGA and Presentation Report (“DETAILED IGA REPORT”), for overall potential net energy cost and consumption savings by implementing the recommended infrastructure; and WHEREAS, CITY has determined that the anticipated cost to CITY to implement the energy-savings and operational-cost saving measures described in the SCOPE OF WORK set forth herein (the “PROJECT”) will be less than the anticipated cost to CITY for thermal, electrical, and other energy, together with anticipated operational, maintenance and other costs, that would have been consumed by CITY in the absence of the PROJECT, in compliance with California Government Code §§4217.10 through 4217.18; and
WHEREAS, CITY has determined that entering into this AGREEMENT to implement the PROJECT is in the best interests of CITY and that California Government Code §4217.10 et seq. allows CITY to enter into this AGREEMENT; and WHEREAS, CITY now desires to retain CONTRACTOR to further develop the electric vehicle charging infrastructure and energy efficiency measures, and in compliance with California Government Code §§4217.10 through 4217.18, to design, engineer, procure, construct, install, and commission such energy efficiency and operational measures as described in Schedule A (SCOPE OF WORK), attached hereto and made a part hereof, as well as to provide other services for the purpose of achieving energy and operational savings for the City’s vehicle fleet and PREMISES to support the vehicle fleet, as more fully set forth herein; and
WHEREAS, CITY is authorized under the laws of the State of California to enter into this AGREEMENT for the purposes set forth herein.

Page 3 of 70 ends

NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, and intending to be legally bound hereby, CITY and CONTRACTOR hereto covenant and agree as follows:

0. DEFINITIONS. For purposes of this Agreement, the following capitalized terms have the meanings set forth below. Each term is defined in the Section, Schedule, or Exhibit referenced.

0.1. “Agreement” is defined in the preamble.

0.2. “Applicable Law(s)” means any statute, law, treaty, building code, rule, regulation, ordinance, code, enactment, injunction, writ, order, decision, authorization, judgment, decree, protocol, procedure or other legal or regulatory determination or restriction by a court or Governmental Authority of competent jurisdiction, as may be in effect at the time the Work is undertaken.

0.3. “Basic Insurance Requirements” is defined in Section 22.1.

0.4. “CARB” means California Air Resources Board.

0.5. “CCS” means combined charging station.

0.6. “Certificate of Acceptance – Final Completion” is defined in Exhibit 1‑B.

0.7. “Certificate of Substantial Completion” is defined in Exhibit 1‑A.

0.8. “City” is defined in the preamble.

0.9. “City Data” is defined in Section 28.1.

0.10. “City Event of Default” is defined in Section 11.4.

0.11. “Compensation Schedule” is defined in Section 3.3.

0.12. “Construction Period” is defined in Schedule A‑7.

0.13. “Construction Phase” is defined in Section 3.1.

0.14. “Contract Bonds” is defined in Section 8.3.

0.15. “Contract Sum” is defined by reference in Schedule B‑1.

0.16. “Contractor” is defined in the preamble.

Page 4 of 70 ends

0.17. “Contractor Event of Default” is defined in Section 11.5.

0.18. “Contractor Warranty” is defined in Schedule A-9.

0.19. “Detailed IGA Report” is defined in the Recitals.

0.20. “DC” means direct current.

0.21. “Differing Site Condition” is defined in Schedule C‑7(a).

0.22. “Effective Date” is defined in the preamble.

0.23. “Energy Savings Guarantee” is defined in Exhibit 2.

0.24. “Equipment” means EVCS and associated infrastructure to support electric vehicle charging.

0.25. “ESPC Documents” is defined in Section 1.

0.26. “EVCS” means Electric Vehicle Charging Stations.

0.27. “EV Vehicles” means battery electric, zero-emissions automobiles, trucks, offroad equipment, and other apparatus owned by the City.

0.28. “Governmental Authority” means any federal, state, regional, town, county, city, municipal or local government agency, department or regulatory body having jurisdiction under Applicable Law over the matter in question.

0.29. “Guarantee Phase” is defined in Section 3.2.

0.30. “Guaranteed Energy Savings” means the sum of the savings described in Exhibit 2‑5.

0.31. “Hazardous Substances” is defined in Schedule C‑8(b).

0.32. “ICE Vehicles” means internal combustion engine automobiles, trucks, offroad equipment, and other apparatus owned by the City and subject to the Advanced Clean Fleet requirements set forth by the California Air Resources Board.

0.33. “IGA” is defined in the Recitals.

0.34. “Incentive Funds” is defined in Section 8.7.

Page 5 of 70 ends

0.35. “Instruments of Service” is defined in Section 9.1.

0.35. “LCFS” means Low Carbon Fuel Standards.

0.36. “Material Change” is defined in Exhibit 2‑4(a).

0.37. “Modification” is defined in Section 1.1.

0.38. “OCPP” means Open Charge Point Protocol.

0.39. “Parties” and “Party” are defined in the preamble.

0.40. “Premises” is defined in the Recitals.

0.41. “Project” is defined in the Recitals.

0.42. “Punch List” is defined in Schedule B‑3(a)(4).

0.43. “Scope of Work” is defined in Section 3.3.

0.44. “Substantial Completion” is the stage in the progress of the WORK when the WORK or designated portion is sufficiently complete in accordance with the ESPC DOCUMENTS so that the CITY can occupy or utilize the WORK for its intended use.

0.45. “Work” is defined in Section 2.

Page 6 of 70 ends

1. ESPC DOCUMENTS. The ESPC documents (hereinafter, “ESPC DOCUMENTS”) consist of this AGREEMENT; other documents listed in this AGREEMENT and MODIFICATIONS issued after execution of this AGREEMENT.

1.1. A “MODIFICATION” is a written amendment to the AGREEMENT, and/or a supplemental Scope of Work and Energy Savings Guarantee subject to this AGREEMENT, signed by both PARTIES. A change order is a MODIFICATION.

1.2. The ESPC DOCUMENTS represent the entire and integrated agreement between the PARTIES and supersede prior negotiations, representations, or agreements, either written or oral. This AGREEMENT may be amended or modified only by a MODIFICATION. The ESPC DOCUMENTS shall not be construed to create a contractual relationship of any kind between any persons or entities other than the CITY and CONTRACTOR.

1.3. In accordance with California Government Code §1097.6(c)(1), CONTRACTOR’s duties and services under this AGREEMENT shall not include preparing or assisting CITY with any portion of CITY’s preparation of a request for proposals, request for qualifications, or any other solicitation regarding a subsequent or additional contract with CITY. CITY shall at all times retain responsibility for public contracting, including with respect to any subsequent phase of this PROJECT. CONTRACTOR’s participation in the planning, discussions, or drawing of project plans or specifications for any subsequent or additional contract shall be limited to conceptual, preliminary, or initial plans or specifications. CONTRACTOR shall cooperate with CITY to ensure that bidders (if CITY elects to utilize a bidding process) for a subsequent contract on any subsequent phase of this PROJECT have access to the same information, including all conceptual, preliminary, or initial plans or specifications prepared by CONTRACTOR pursuant to this AGREEMENT.

1.4. Schedules and Exhibits. CONTRACTOR has prepared, and CITY has approved and accepted, the Schedules and Exhibits set forth below, copies of which are attached hereto and made part of this AGREEMENT by reference.

SCHEDULES
Schedule A: SCOPE OF WORK
Schedule B: Compensation to CONTRACTOR
Schedule C: Additional Responsibilities
Schedule D: Preliminary Construction Schedule

Page 7 of 70 ends

EXHIBITS
Exhibit 1: Completion Form Templates
Exhibit 1-A: Certificate of Substantial Completion
Exhibit 1-B: Certificate of Acceptance - Final
Completion
Exhibit 2: Form of Energy Savings Guarantee, including the following Exhibits (the “ENERGY SAVINGS
GUARANTEE”):

Exhibit 2-A: Baseline Energy Consumption
Exhibit 2-B: Savings Measurement & Calculation
Formulas; Methodology to Adjust
Baseline

2. THE WORK. The term “WORK” means the investigation, design, engineering, construction, installation, commissioning and related services required to fulfill CONTRACTOR’s obligations under the ESPC DOCUMENTS, whether completed or partially completed, and includes all labor, materials, Equipment, and services provided or to be provided by CONTRACTOR.

2.1. CONTRACTOR will fully execute the WORK described in the ESPC DOCUMENTS, except to the extent specifically indicated in the ESPC DOCUMENTS to be the responsibility of others.

2.2. CONTRACTOR will perform all WORK through sub-contractors or through CONTRACTOR’s own forces.

2.3. CONTRACTOR will perform the WORK in accordance with sound engineering and safety practices, in compliance with any and all reasonable rules of CITY relative to the PREMISES, and in compliance with Applicable Laws in effect on the EFFECTIVE DATE or the date of a MODIFICATION, as applicable. If CONTRACTOR performs WORK contrary to Applicable Laws, CONTRACTOR will assume responsibility for such WORK and will bear the costs attributable to correction.

3. PHASES OF WORK. The WORK will be performed in phases, including: the Construction Phase (and construction of any additional phases pursuant to a supplemental Scope of Work or Modification), and the corresponding Guarantee Phase, each as outlined in the applicable Scope of Work or Modification.

3.1. The Construction Phase.

Page 8 of 70 ends

The CITY shall issue a single formal Notice to Proceed (NTP) for all WORK, including design, procurement of long-lead items, and construction at all PREMISES, upon full execution of this AGREEMENT. The Construction Schedule will be developed and administered as set forth in Schedule A-3. Construction at each PREMISES shall proceed upon issuance of the applicable permits, without the need for a separate NTP.

3.2. The Guarantee Phase. Regarding any Scope of Work or Modification, this phase will commence upon the execution of an Energy Savings Guarantee in the form of Exhibit 2, for such Scope of Work or Modification, following the execution of the Certificate of Acceptance - Final Completion in the form of Exhibit 1-B, corresponding to such Scope of Work or Modification.

3.3. Scope & Fee per Phase. The SCOPE OF WORK for each phase of the WORK will be defined in the applicable Schedule A (SCOPE OF WORK) (the “SCOPE OF WORK”). The fee for each phase of the WORK will be defined in the applicable Schedule B (Compensation to CONTRACTOR) (the “COMPENSATION SCHEDULE”).

4. FEES FOR THE WORK; PAYMENT. CITY shall pay CONTRACTOR NINETEEN

MILLION NINE HUNDRED TWENTY-TWO THOUSAND FOUR HUNDRED THIRTY-SIX DOLLARS ($19,922,436) for the performance of the WORK in accordance with the COMPENSATION SCHEDULE.

4.1. Billing Information Procedure. Payments due to CONTRACTOR will be calculated each month and paid in accordance with the COMPENSATION SCHEDULE.

4.2. Payment. CITY shall pay CONTRACTOR within thirty (30) days of receipt of CONTRACTOR’s application for payment.

5. ICE VEHICLE FUEL USAGE RECORDS, OPERATIONAL AND MAINTENANCE DATA. CITY has furnished or will furnish to CONTRACTOR, upon its request, all of CITY’s records and complete data concerning fuel usage and vehicle-related maintenance for existing or future ICE VEHICLES.

6. JOINT REPRESENTATIONS AND WARRANTIES. Each PARTY warrants and represents to the other that:

6.1. It has all requisite power, authority, licenses, permits, and franchises, corporate or otherwise, to execute and deliver this AGREEMENT and perform its obligations hereunder;

Page 9 of 70 ends

6.2. Its execution, delivery, and performance of this AGREEMENT have been duly authorized by, or are in accordance with, its organic instruments, and this AGREEMENT has been duly executed and delivered for it by the signatories so authorized, and constitutes its legal, valid, and binding obligation;

6.3. Its execution, delivery, and performance of this AGREEMENT will not breach or violate, or constitute a default under any contract, lease or instrument to which it is a party or by which it or its properties may be bound or affected; and

6.4. It has not received, nor to the best of its knowledge is there pending or threatened, any notice of any violation of any Applicable Laws which would materially and adversely affect its ability to perform hereunder.

7. ADDITIONAL REPRESENTATIONS OF THE PARTIES.

7.1. CITY’s Representations. CITY hereby warrants, represents and promises that it has provided, or will provide timely, to CONTRACTOR all records relating to energy usage and energy-related maintenance of the PREMISES requested by CONTRACTOR and the information set forth therein is, and all information in other records to be subsequently provided pursuant to this AGREEMENT will be, true and accurate in all material respects.

7.2. CONTRACTOR’s Representations. CONTRACTOR hereby warrants, represents and promises that:
(a) It is properly qualified, licensed and equipped to supply and perform the WORK in the State of California;
(b) It will make available, upon reasonable request, all documents relating to its performance under this AGREEMENT, including all contracts and subcontracts entered into;
(c) It will use qualified subcontractors and delegates, appropriately registered, licensed and bonded in this state, to perform the WORK so subcontracted or delegated pursuant to the terms hereof; (d) It is financially solvent, able to pay its debts as they mature and possesses sufficient working capital to complete the WORK and perform its obligations under this AGREEMENT.

8. PERFORMANCE BY CONTRACTOR.

Page 10 of 70 ends

8.1. CONTRACTOR will perform all tasks/phases under this AGREEMENT, including each Construction Phase, in such a manner so as not to harm the structural integrity of the EVCS, their operating systems, or the PREMISES.

CONTRACTOR will repair and restore to its original condition any area of damage caused by CONTRACTOR’s performance under this AGREEMENT. CITY reserves the right to review the WORK performed by CONTRACTOR and to direct CONTRACTOR to take certain corrective action if, in the reasonable opinion of the CITY, the structural integrity of the PREMISES or its operating system is or will be harmed. All costs associated with such corrective action to damage caused by CONTRACTOR’s performance of the WORK will be borne by CONTRACTOR.

8.2. CONTRACTOR will perform the WORK in conformity with all legal requirements and industry standards observed by a specialist of CONTRACTOR’s profession in California. CONTRACTOR will remain responsible for the professional and technical accuracy of all WORK performed, whether by CONTRACTOR or its subcontractors or others on its behalf, throughout the term of this AGREEMENT.

8.3. Prior to commencing WORK under this AGREEMENT, CONTRACTOR will furnish a performance bond, in an amount equal to one hundred percent (100%) of the Construction Phase Contract Sum, and a payment bond to guarantee payment of all claims for labor and materials furnished, in an amount equal to one hundred percent (100%) of the Construction Phase Contract Sum (collectively, the “CONTRACT BONDS”). The CONTRACT BONDS are not being furnished to cover the performance of any energy guaranty or guaranteed savings under this AGREEMENT, nor to cover any Equipment and/or material manufacturer’s warranty or other third-party warranty being assigned to CITY.

8.4. Compliance With All Laws.
(a) CONTRACTOR and each of its subcontractors will, at
CONTRACTOR’s sole cost, comply with all Applicable Laws now in force, or which may hereafter be in force, pertaining to this AGREEMENT, and will faithfully observe, in all activities relating to or growing out of this AGREEMENT, all applicable CITY ordinances and permitting requirements now in force or which may hereafter be in force including, without limitation, obtaining a City of Bakersfield business tax certificate (Bakersfield Municipal Code Chapter 5.02) where required.
(b) To the extent required by California Labor Code §1771 or other Applicable Laws, all employees of CONTRACTOR and CONTRACTOR’s subcontractors performing WORK at the PREMISES will be paid the per diem prevailing wages for the employee’s job classification in the locality in which the WORK is performed. In accordance with California Labor Code §§1773 and 1773.2, CITY will obtain from the Director of Industrial Relations the general

Page 11 of 70 ends

prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work, in the locality in which the WORK is to be performed, for each craft, classification or type of worker needed to execute the WORK at the PREMISES, and will cause copies of such determinations to be kept on file at its principal office. CONTRACTOR must post a copy at the PREMISES. CITY will promptly notify CONTRACTOR of any changes to any such prevailing wage determination.

8.5. Licensing. CONTRACTOR will, at its sole cost and expense, keep in effect or obtain at all times during the term of this AGREEMENT any licenses, permits and approvals which are legally required for CONTRACTOR to practice its profession and perform the WORK. At least one (1) officer or key employee of CONTRACTOR will hold the required licenses or professional degrees.

8.6. SB 854 Compliance. To the extent Labor Code Section 1771.1 applies to this AGREEMENT, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, be subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in such chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. The prime contractor is required to post job site notices in compliance with Title 8 California Code of Regulations Section 16451. This PROJECT is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

8.7. Incentive Funds. CONTRACTOR will assist CITY in the preparation and submission to the applicable agencies of applications and documentation necessary for mutually agreed energy efficiency rebate, incentive, credits, and other supplemental funding programs, (collectively “INCENTIVE FUNDS”).

The Parties mutually represent that the following is true and are relying thereon:

PG&E EV Fleet Program and INCENTIVE FUNDS for all eight (8) PREMISES have already been awarded to the CITY. The CARB Charge Up! Grant has already been awarded to CITY for four (4) of the PREMISES included in this AGREEMENT.

CONTRACTOR cannot be responsible for PG&E completing their WORK on time to ensure these INCENTIVE FUNDS are realized by the CITY.

The Low Carbon Fuel Standard (LCFS) credits are based on market rates for the credits and actual charging of the VEHICLES by the CITY. CONTRACTOR does not

Page 12 of 70 ends

control the market rates for LCFS credits and is not responsible for credits to CITY.

LCFS credits are not considered INCENTIVE FUNDS for purposes of this Agreement.

CONTRACTOR makes no guarantee that CITY will receive funding from any such INCENTIVE FUNDS, or any portion thereof; CONTRACTOR expressly disclaims any liability for CITY’s failure, through no fault of CONTRACTOR, to receive any portion of the INCENTIVE FUNDS, and CITY acknowledges and agrees that CONTRACTOR will have no liability for any failure to receive all or any portion of the INCENTIVE FUNDS unless such failure is the direct result of CONTRACTOR’s failure to timely complete the WORK. Receipt of the INCENTIVE FUNDS will not alter the Contract Sum of this AGREEMENT or the payment timeline associated with payment of the Contract Sum, unless executed in writing by the Parties as a MODIFICATION. In the event CITY’s failure to realize INCENTIVE FUNDS is a direct result of CONTRACTOR’s failure to timely complete work, CITY shall be entitled to seek such losses as actual and direct damages to the extent caused by such failure, but in no event shall any damages arising out of a failure to realize INCENTIVE FUNDS or otherwise described under this Section 8.7 exceed five percent (5%) of the Contract Sum. Any and all rebate deposits paid by CONTRACTOR will be immediately returned to CONTRACTOR when received by CITY.

9. OWNERSHIP.

9.1. Ownership of Certain Proprietary Property Rights. CITY will not, by virtue of this AGREEMENT, acquire any interest in any formulas, patterns, devices, secret inventions or processes, copyrights, patents, other intellectual or proprietary rights, or similar items of property which are or may be used in connection with the WORK. All data, reports, proposals, plans, specifications, flow sheets, drawings, and other products of the WORK (the “INSTRUMENTS OF SERVICE”) furnished directly or indirectly, in writing or otherwise, to CITY by CONTRACTOR under this AGREEMENT will remain CONTRACTOR’s property and may be used by CITY only for the WORK. CONTRACTOR will be deemed the author and owner of such INSTRUMENTS OF SERVICE and will retain all common law, statutory and other reserved rights, including copyrights. The INSTRUMENTS OF SERVICE may not be used by CITY for future additions or alterations to the PROJECT or for other projects, without the prior written agreement of CONTRACTOR. Any unauthorized use of the INSTRUMENTS OF SERVICE will be at CITY’s sole risk and without liability to CONTRACTOR. If CITY uses the INSTRUMENTS OF SERVICE for implementation purposes, including additions to or completion of the PROJECT, without the written permission of CONTRACTOR, CITY agrees to waive and release, and indemnify and hold harmless, CONTRACTOR, its subcontractors, and their directors, employees, subcontractors, and agents from any and all claims, losses, and other liabilities associated with or resulting from such use.

Page 13 of 70 ends

9.2. Non-Interest. No CITY officer or employee shall hold any interest in this AGREEMENT (California Government Code section 1090). The PARTIES hereto agree that CONTRACTOR, and any agents and employees of CONTRACTOR, is acting in an independent capacity in the performance of this AGREEMENT, and not as a public official, officer, employee, consultant, or agent of CITY for purposes of conflict-of-interest laws or any other Applicable Law.

10. INDEMNIFICATION; LIMITATION OF LIABILITY.

10.1. Indemnification. CONTRACTOR shall indemnify, defend, and hold harmless CITY and CITY’s officers, agents and employees against any and all liability, claims, actions, causes of action or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, arising out of, connected with, or caused by CONTRACTOR or CONTRACTOR’s employees, agents, independent contractors, companies, or subcontractors in the performance of, or in any way arising from, the terms and provisions of this Agreement whether or not caused in part by a party indemnified hereunder, except for CITY’s sole active negligence or willful misconduct.

10.2. Design Professional Services. For all services that include, as defined by California Civil Code §2782.8, design professional services, all provisions, clauses, covenants, and agreements contained in, collateral to, or affecting any such services, and amendments thereto, that purport to indemnify, including the duty and the cost to defend, the indemnitee by a design professional against liability for claims against the indemnitee, are unenforceable, except to the extent that the claims against the indemnitee arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the design professional. In no event shall the cost to defend charged to the design professional exceed the design professional’s proportionate percentage of fault.

10.3. Third Party Claims. CITY shall timely notify CONTRACTOR of third-party claims relating to this AGREEMENT. CITY shall be allowed to recover from CONTRACTOR, and CONTRACTOR shall pay on demand, all costs of notification.

10.4. Limitation on Liability. The liability of a defaulting PARTY, in connection with this AGREEMENT or any analysis, report, recommendations, or other deliverables provided hereunder, shall be limited to direct, actual damages. Neither PARTY shall be liable to the other PARTY for any special, indirect, incidental or consequential damages whatsoever, whether in contract, tort (including negligence) or in strict liability, including, but not limited to, operational losses in the performance of business such as any increase in operating expense.

The foregoing limitation on liability shall not apply to amounts payable pursuant to CONTRACTOR’s indemnification obligations for third-party claims under Section 10.1.

Page 14 of 70 ends

11. CONDITIONS BEYOND CONTROL OF THE PARTIES; EVENTS OF DEFAULT.

11.1. CONTRACTOR will notify CITY in writing immediately of any delay or anticipated delay in CONTRACTOR’s performance of a Project Site’s Scope of Work under this AGREEMENT due to causes or circumstances beyond the reasonable control of CONTRACTOR. Notice will include (i) the reason for the delay, (ii) the delay’s anticipated length, and (iii) the delay’s anticipated financial cost. The date of performance will be extended for a period equal to the time lost by reason of the delay, subject to CITY’s final approval, such approval not to be unreasonably withheld.

11.2. CONTRACTOR may, subject to CITY’s agreement via a MODIFICATION, be entitled to additional compensation due to any such extension of time, or, in certain instances, including the implementation of tariffs, due to increases in material, Equipment, and/or labor costs. Any extension of time or increase in the Contract Sum pursuant to this Section 11 will be documented by a MODIFICATION signed by the PARTIES. Examples of such possibly excusable delays are natural calamities, strikes and boycotts, war or civil unrest, delay or inability to secure products, parts, materials, fuel, supplies, Equipment, or power at reasonable prices or in sufficient amounts through usual sources of supply, or governmental actions, a change in Applicable Law, the implementation or proposed implementation of new tariffs or modification of existing tariffs that increase CONTRACTOR’s cost of materials and Equipment, regional labor escalation or shortages, and other events that are commonly deemed force majeure events.

11.3. Events of Default by CITY. Each of the following events or conditions will constitute a “CITY EVENT OF DEFAULT”:
(a) Any failure by CITY to pay any amount to CONTRACTOR which is not paid within thirty (30) days after written notification by CONTRACTOR that CITY is delinquent in making payment; provided that CONTRACTOR is not then in default in its performance under the terms of this AGREEMENT; or (b) Any other material failure by CITY to perform or comply with the terms and conditions of this AGREEMENT, including breach of any covenant contained herein or repeated failure to diligently prosecute the WORK in accordance with the Construction Schedule, provided that such failure continues for thirty (30) days after notice to CITY demanding that such failures to perform be cured, or if such cure cannot be effected in thirty (30) days, CITY will not be in default if CITY commences a cure within such thirty (30) day period and diligently pursues completion thereof; or

Page 15 of 70 ends

(c) Any representation or warranty furnished by CITY in this AGREEMENT was false or misleading in any material respect when made.

11.4. Events of Default by CONTRACTOR. Each of the following events or conditions will constitute a “CONTRACTOR EVENT OF DEFAULT”:
(a) Any failure by CONTRACTOR to meet the standards of comfort and service set forth in Schedule C-1 due to failure by CONTRACTOR to properly design, install, maintain, repair or adjust the Equipment; provided that such failure continues for thirty (30) days after notice to CONTRACTOR demanding that such standards be met, or if such failure cannot be cured within thirty (30) days, CONTRACTOR will not be in default if CONTRACTOR commences a cure within such thirty (30) day period and diligently pursues completion thereof. (b) Any other material failure by CONTRACTOR to perform or comply with the terms and conditions of this AGREEMENT, including breach of any covenant contained herein, provided that such failure continues for thirty (30) days after notice to CONTRACTOR demanding that such failures to perform be cured, or if such cure cannot be effected in thirty (30) days, CONTRACTOR will not be in default if CONTRACTOR commences a cure within such thirty (30) day period and diligently pursues completion thereof;
(c) Any representation or warranty furnished by CONTRACTOR in this AGREEMENT was false or misleading in any material respect when made; or (d) The filing of a bankruptcy petition, whether by CONTRACTOR or its creditors against CONTRACTOR, which proceeding has not been dismissed within sixty (60) days of its filing, or an involuntary assignment for the benefit of all creditors or the liquidation of CONTRACTOR.

11.5. In the event of a default, the non-defaulting party shall have the right, but not the obligation, and upon seven (7) days' notice, to terminate the Agreement, in whole or in part, and submit a claim to the defaulting party for damages according to the requirements of Section 10. Disputes arising out of claims of default shall be resolved according to the dispute resolution process specified in Section 12.

12. CLAIMS AND DISPUTE RESOLUTION.

12.1. Informal Process. All disputes will first be submitted to the individuals listed in Section 20 for resolution.

Page 16 of 70 ends

12.2. Claims Process Under Public Contract Code. In the event that a remedy acceptable to both CITY and CONTRACTOR cannot be found pursuant to Section 12.1, CONTRACTOR may commence the dispute resolution process set forth in California Public Contract Code §9204 et seq., which can be summarized as follows (the following is a summary only and is not intended to modify in any way the requirements and timeframes set forth in the statute):
(a) A “claim” means a separate demand by a contractor for one or more of the following: (i) a time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project; (ii) payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled; and (iii) payment of an amount that is disputed by the public entity. The claimant will furnish reasonable documentation to support the claim.
(b) Upon receipt of a claim, the public entity will conduct a reasonable review of the claim and will provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed.

If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim within the time prescribed by statute, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute.
(c) Following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity will provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim will be processed and made in accordance with the statute. Any disputed portion of the claim, as identified by the contractor in writing, will be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally.
(d) Notwithstanding the foregoing, upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of binding arbitration, as set forth in Section 12.3 or Section 12.5.

12.3. Arbitration. CITY and CONTRACTOR agree that if the claim or dispute cannot be resolved by the process set forth in Public Contract Code §9204 et seq. and summarized in Section 12.2, the PARTIES may elect to resolve the claim or dispute via arbitration pursuant to Public Contract Code §10240 et seq., and the provisions of Public Contract Code §20104 et seq. will not apply.

Page 17 of 70 ends
← All documents from this meeting