BAKERSFIELD CITY COUNCIL
AGENDA
REGULAR MEETING
November 18, 2026, 5:15 p.m.
Council Chambers, City Hall, 1501 Truxtun Avenue
PUBLIC PARTICIPATION GUIDELINES
In accordance with the Ralph M. Brown Act (California Government Code §§ 54950 et seq.), the City has established these guidelines to promote open, accessible, and orderly public participation in our City Council Meetings. Meeting agendas contain the topics to be discussed at a meeting and are posted 72 hours in advance of a regular meeting, or at least 24 hours in advance for special meetings.
Language Access & Americans with Disabilities Act (ADA) Accommodations The City provides reasonable accommodation for language access, including space for personal interpreters upon request. If you require special assistance to participate in the meeting, including reasonable accommodations under the Americans with Disabilities Act, please contact the City Clerk’s office at least three business days in advance during normal business hours at (661) 326- 3767.
In-Person Participation
Meetings are held in the Council Chambers at 1501 Truxtun Avenue. To speak, please complete a Speaker Card at the kiosk and submit it to the City Clerk before the meeting begins or before the item is called.
Remote Participation
The City currently provides an option for remote participation in meetings via audio only (telephonic participation). The remote call-in line is (661) 529-9511 and meeting code is 3952. Once connected, press star (*) for more options, press 1 to listen only and press 3 to request to speak. Remote participants must adhere to the same conduct rules as in-person attendees. For additional instructions, or to pre-register to speak up to 30 minutes prior to the meeting, visit the public participation page https://engage.bakersfield.gov/
Time Limits for Public Comments
Public comments are welcome only during designated portions of the agenda, and are subject to the following time limits:
Non-Agenda Item Public Statements (general City business): 2 minutes per speaker, up to 10 minutes for remote speakers and 10 minutes for in-person speakers (20 minutes total) •
Agenda Item Public Statements (including Consent Calendar, counted as one item): 2 minutes per speaker, up to 10 minutes for remote speakers and 10 minutes for in-person speakers (20 minutes total)
•
Public Hearings: For public hearings, proponents and opponents are each allotted 20 minutes for testimony, plus 10 minutes for rebuttal, to be divided equally between remote and in-person speakers.
•
For maximum impact, submit written comments by 2:00 p.m. on Thursday prior to the hearing for inclusion in the agenda packet. Written comments are also accepted up to and during the hearing.
All speakers who do not specify a topic on their Speaker Card will be scheduled to speak under Non-Agenda Items. If you are not present or available to speak when you are called upon, the City Clerk will move to the next speaker and you may not have another opportunity to speak.
Disruptions
Technical or behavioral disruptions will be addressed according to Council policy. The meeting may recess for up to one hour to restore order or service, if required. Disruptive individuals may be removed or have their participation limited, regardless of attendance format.
We value your voice and engagement—it strengthens our community. Thank you for participating in your City government.
1. ROLL CALL
2. INVOCATION
3. PLEDGE OF ALLEGIANCE
4. PRESENTATIONS
4.a Proclamation presentation to Karina Funez, Policy Supervisor for Blue Zones Project Bakersfield, Gabriel Arellano, Program Manager for Children's First Bakersfield, and Principal LaFleasha Owens of Williams Elementary School, declaring "Ruby Bridges Walk to School Day" on November 18, 2026, in Bakersfield.
5. PUBLIC STATEMENTS
5.a Non-Agenda Item Public Statements
5.b Agenda Item Public Statements
6. CONSENT CALENDAR
6.a Minutes
6.a.1 Approval of minutes of the November 4, 2026, Regular Council Meetings.
Staff recommends approval of the minutes.
6.b Department Payments and Agreements
6.b.1 Receive and file department payments from October 21, 2026 to November 3, 2026 totaling $28,850,196.65
as follows: department payments in the amount of $27,998,925.97, and Self Insurance payments in the amount of $851,270.68.
Staff recommends receiving and filing the report.
6.b.2 Receive and file department agreements over $40,000 and under $100,000 between October 21, 2026,
and November 3, 2026.
Staff recommends receiving and filing the report.
6.c Ordinances
6.d Resolutions
6.d.1 Resolution authorizing the City of Bakersfield to submit a grant application to the Office of Grants
Resolution authorizing the City of Bakersfield to submit a grant application to the Office of Grants and Local Services to support Phase II of the MLK Park Reimagining and Revitalization Project and Local Services to support Phase II of the MLK Park Reimagining and Revitalization Project. (Ward 2) Staff recommends approval of the Resolution.
6.d.2 Resolution setting rates and equipment specifications for tow truck services provided pursuant to contract with the City
Staff recommend adoption of the resolution.
6.d.3 Resolution determining that Adobe software products and subscriptions can most efficiently be obtained through
cooperative procurement bidding procedures from Dell and authorizing the Finance Director to dispense with bidding for the purchase of Adobe software products and subscriptions in an amount not to exceed $200,000 for the Technology Services Department.
Staff recommend adoption of the resolution and approval of the purchase.
6.d.4 Dispense with bidding for the purchase of Dell workstations for the Technology Services Department
cooperative procurement bidding procedures from Dell Marketing L.P. and authorizing the Finance Director to dispense with competitive bidding for the purchase of Dell workstations and equipment in the amount not to exceed $500,000 for the Technology Services Department.
Staff recommend adoption of the resolution and approval of the purchase.
6.d.5 Dispense with bidding for the purchase of building security systems services for the Technology Services Department.
1. Resolution determining that building security installation, maintenance, repair & monitoring services cannot be reasonably obtained through the usual bidding procedures and authorizing the Finance Director to dispense with bidding and negotiate the purchase of building security installation, maintenance. Repair & monitoring services not to exceed $250,000 for the Technology Services Department.
2. Approve contract to Tel-Tec Security Systems, Inc to provide security systems services a one-year term, not to exceed $250,000.
Staff recommend adoption of Resolution and approval of the Agreement.
6.d.6 Resolution determining that EV Chevrolet Silverado crew cab pickup trucks can most efficiently be obtained through
cooperative procurement bidding procedures from Winner Chevrolet/Elk Grove Auto and authorizing the Finance Director to dispense with bidding for the purchase of 16 units in the amount of $767,596.32 for the multiple
Departments and Divisions.
Staff recommend adoption of the resolution and approval of the purchase
6.d.7 Resolution determining that an EV Wheel Loader can most efficiently be obtained through
cooperative procurement bidding procedures from Volvo Construction Equipment & Services and authorizing the Finance Director to dispense with bidding for the purchase of one unit in the amount of $436,086.11 for the Solid Waste Division withing the Public Works Department.
Staff recommend adoption of the resolution and approval of the purchase.
6.d.8 Dispense with bidding for the purchase of a Gas Ford F550 Regular Cab Chassis with outfitting for the Fire Department
Resolution determining that a gas Ford F550 Regular Cab Chassis with CTEC outfitting can most efficiently be obtained through cooperative procurement bidding procedures from Downtown Ford Sacramento and authorizing the Finance Director to dispense with bidding for the purchase of one unit in the amount of $157,734.25 for the Fire Department.
1. Appropriate $45,945 Federal Grant Funds from the USDA Forest Services and the USDI Bureau of Land Management Fund balance to the Fire Department Operating budget.
2. Appropriate $45,944 State Grant Funds from the California Office of Emergency Services Fund balance to the Fire Department
Operating budget.
3. Staff recommend adoption of the resolution and approval of appropriation to complete the purchase
6.d.9 Dispense with bidding for the purchase of elevator modernization services for City Hall North and Dignity Health Arena
Resolution determining that elevator modernization work can most efficiently be procured through cooperative procurement bidding procedures from TK Elevator Corporation and authorizing the Finance Director to dispense with bidding therefore in the amount of $1,675,000.
1. Agreement with TK Elevator Corporation to modernize the elevators at City Hall North and the Dignity Health Arena for a one-year term in an amount of $1,675,000.
2. Authorize staff to approve, as necessary, up to $325,000 in City controlled contingency for unforeseen conditions encountered during the construction of the project for a total budget of $2,000,000. (Ward 2)
3. Staff recommend adoption of the resolution and approval of the agreement and City controlled contingency.
6.d.10 Dispense with bidding for Mt. Vernon Facility soil analysis services and Amendment No. 4 to Agreement PW22-167
Resolution determining that specialized soil and compost laboratory analysis and quality testing services cannot be reasonably obtained through the usual bidding procedures and authorizing the Finance Director to dispense with bidding and negotiate the purchase of the services, not to exceed $100,000 for the Mount Vernon Organics Recycling and Composting Facility.
1. Amendment No. 4 to Agreement No. PW22-167 with Soil Control Lab (increase compensation by $100,000 and extend the term to November 29, 2029) to continue to provide specialized soil and compost laboratory analysis and quality testing services for the Mount Vernon Organics Recycling and Composting Facility. (Ward 1)
2. Staff recommend adoption of resolution and approval of the amendment.
6.e Job Specifications and Salary Updates
6.e.1 Job Specification and Salary Resolution Updates 11.18.26 Revised Job Specification: Construction Inspector I/II #25250 / #25260
1. 2. New Job Specifications: Service Desk Supervisor #57175 Amendment No. 5 to Resolution No. 144-2025 setting salaries and related benefits for the Unrepresented, General Supervisory, and Management Unit, updating unit name.
3. Staff recommends adoption of the new and revised job specifications and Resolution.
6.f Agreements
6.f.1 Agreement with California Interscholastic Federation (not to exceed $342,500)
to host the State High School Wrestling Championships in Bakersfield.
Staff recommends approval of the agreement.
6.f.2 Agreement with Mercy House (not to exceed $639,976.58) in HUD funding in the amount of $469,546.58 in HOME Investment Partnership program (HOME) funds and $170,430 in Community Development Block Grant (CDBG) administration funds to administer the Tenant-Based Rental Assistance program (TBRA).
Staff recommends approval of the agreement.
6.f.3 Right of Way Agreement with Jaime Leal
an individual, to acquire property interests located at 31-33 South Real Road for $400,000 for the Centennial Corridor Southbound SR99 to Westbound SR58 Connector Project (8th Movement). (Ward 2) Staff recommend approval of the agreement.
6.f.4 Possession and Use Agreement with Kaiser Foundation Health Plan, Inc. for property interests located at 3501 Stockdale Highway for $589,000 and additional compensation for construction-impact measures for $1,740,566 for the Centennial Corridor Southbound SR99 to Westbound SR58 Connector Project (8th Movement). (Ward 2)
Staff recommends approval of the agreement.
6.f.5 Possession and Use Agreement with California Water Service Company for property interests located at 3403 Stockdale Highway for $103,000 for the Centennial Corridor Southbound SR99 to Westbound SR58 Connector Project (8th Movement). (Ward 2)
Staff recommends approval of the agreement.
6.f.6 Design Consultant Agreement with Diversified Project Services International, Inc.
(not to exceed $200,334), to provide design and engineering services for the Carrier Spreading Facility Pipeline Rehabilitation Project. (Wards 3 & 6) Staff recommends approval of the agreement.
6.f.7 Construction Management Agreement with NV5
(not to exceed $410,810.70) to provide construction management services for the Wastewater Treatment Plants No. 2 and 3 Septage Receiving Station Improvement Project.
Staff recommend approval of the agreement.
6.f.8 Agreement for Acquisition and Development of Westbridge at Seven Oaks Park
Approve Agreement with Bolthouse Land Company, LLC for the acquisition and development of Westbridge at Seven Oaks Park located within Village “D” of the West Ming Specific Plan.
1. Appropriate $552,992 Park Improvement Fund balance from Southwest Developer Reimbursement – Zone 1 for the
reimbursement to Bolthouse Land Company, LLC for the
acquisition and development of Westbridge at Seven Oaks Park. (Ward 5)
2. Staff recommends approval of the agreement and appropriation.
6.f.9 Encroachment Agreement with Mojave Pipeline, Kern River Gas, LGI Homes-California, and City of Bakersfield for Tract 7471 The City of Bakersfield is requesting to enter into an encroachment agreement with Mojave Pipeline Company, LLC, Kern River Gas Transmission Company, and LGI Homes-California, LLC to allow the construction of street, sewer, and storm drain improvements over an 30” High Pressure Gas Pipeline. (Ward 3)
Staff recommends approval of the encroachment agreement.
6.f.10 Amendment No. 1 to Agreement No. WR26-005 with DXP Enterprise (extend the term by one year and increase compensation by $100,000; revised not to exceed $200,000) to provide On-Call Pump Repair & Maintenance for the Wastewater Division.
Staff recommends approval of the amendment.
6.f.11 Amendment No. 1 to Agreement No. WR26-006 with Surface Pumps (extend the term by one year and increase compensation by $100,000; revised not to exceed $200,000) to provide On-Call Pump Repair & Maintenance for the Wastewater Division.
Staff recommends approval of the amendment.
6.f.12 Amendment No. 1 to Agreement No. CM26-040 with M.D. Atkinson Company, Inc.
($863,573.72), for tenant improvements at the City building located at 1430 and 1440 Truxtun Ave. for the Bakersfield Police Department to move staff and operations from 4550 California Ave. (Ward 2)
Staff recommends Council approve the amendment to the agreement.
6.f.13 Amendment No. 3 to Agreement No. 2023-267 with ImageTrend LLC (increase compensation by $14,005.83; revised not to exceed $940,511.69) for software for the Fire Department.
Staff recommend approval of the agreement
6.f.14 Amendment No. 3 to Agreement No. 2023-294 with The Open Door Network
(increase compensation by $322,400; revised not to exceed $1,233,920 and extend term to December 13, 2027), to continue recycling and sorting materials at the Mt Vernon Organics Recycling & Composting Facility. (Ward 1)
Staff recommends approval of the Amendment.
6.f.15 Amendment No. 4 to Agreement No. 2022-276 Ennis-Flint Inc. (increase compensation by $140,000; revised not to exceed $810,546.25 and extend the term by one year), to continue the supply of Traffic Paint.
Staff recommend approval of amendment.
6.f.16 Amendment No.3 to Agreement No. 2024-245 with Kern Sprinkler Landscaping Inc.
(increase compensation by $400,000; revised not to exceed amount of $2,238,174.98), to continue the supply of On-Call Irrigation & Landscaping Service.
Staff recommend approval of the amendment.
6.f.17 Amendment No 1 to Agreement No 2025-093 with Witcher Electric Inc. (to increase compensation by $1,000,000; revised not to exceed $2,500,000), to provide Electrical Services for the Water Department.
Staff recommends approval of the amendment.
6.f.18 Amendment No. 1 to Agreement No. 2023-274 with South Coast Automation System
(extend the term by one year) to provide On-Call SCADA System Maintenance and Support Services for the Wastewater Division.
Staff recommend approval of amendment.
6.f.19 Amendment No.1 to Agreement No. 2025-241 Silvas Oil Company (increasing by $1,530,000; revised not to exceed amount of $3,030,000 and extending the term by one year) to continue the supply of gasoline and diesel fuels, bobtail/partial loads.
Staff recommend approval of the amendment.
6.f.20 Amendment No. 5 to Agreement No. 2021-242 with Rincon Consultants, Inc.
(extend term to December 31, 2028), related to the General Plan Update.
Staff recommends approval of the amendment.
6.g Bids
6.g.1 Extend bid from Jim Burke Ford for the purchase of 35 four-door police Ford Interceptor Utility vehicles for
the Police Department in the amount of $1,759,619.10 ($50,274.83 per unit).
Staff recommend extension of bid and approval of the purchase.
6.g.2 Wastewater Treatment Plants No. 2 and 3 Septage Receiving Station Improvements
Accept bid and approve contract with GSE Construction Company Inc. (not to exceed $1,107,007), for the Septage Receiving Station Improvement Project.
Staff recommend acceptance of low bid and approval of contract.
6.h Miscellaneous
6.h.1 Appropriate $80,000 in Transient Occupancy Taxes (TOT) fund balance to the Transient Occupancy Taxes Capital Improvement Budget.
Staff recommends approval of the appropriation.
6.h.2 Appropriate $1,864,710 in Community Development Block Grant (CDBG) funds to the HUD CDBG Entitlement Fund
Development Services Operating Budget
Staff recommends approval of the appropriation.
6.i Successor Agency Business
6.j Public Safety/Vital Services Measure
6.j.1 Amendment No. 1 to Agreement No. 2025-082 with St. Vincent de Paul (extend term to June 30, 2027) to allow additional time for completion of the expansion and remodel project at 316 Baker Street. (Ward 2)
Staff recommends approval of the amendment.
7. CONSENT CALENDAR PUBLIC HEARINGS
7.a Public Hearing to consider resolution adopting updated fees pursuant to the cost recovery system and approving the Master Fee Schedule.
Staff recommends adoption of the resolution.
7.b Public Hearing on Behalf of the Housing Authority of the County of Kern and Approval of Loan Agreement
for the Rehabilitation of Village Park Senior Apartments.
Conduct a public hearing as required by Section 147(f) of the Internal Revenue Code of 1986 to receive comments relating to the plan of finance for the issuance by the Housing Authority of the County Kern (“Authority”) of Multifamily Housing Revenue Bonds in the amount not to exceed ($6,000,000) of the Authority’s Revenue Bonds (Bonds) for the purpose of financing rental housing projects.
1. Adopt Resolution approving the plan of finance for the issuance by the Housing Authority of Multifamily Housing Revenue Bonds in an amount not to exceed ($6,000,000) for the rehabilitation of the project known as Village Park Senior Apartments, a 59-unit affordable housing complex located at 2300 R Street in Bakersfield California and certain other matters relating thereto.
2. Approve the Indemnification Agreement between the City of Bakersfield and the Housing Authority of the County of Kern.
3. Approve the Loan Agreement between the City of Bakersfield and GEAHI Village Park LP to fund the rehab of Village Park Senior Apartments with Bakersfield Affordable Housing Trust funds. (Ward 2)
4. Staff recommends that the City Council conduct a public hearing, adopt a Tax Equity and Fiscal Responsibility Act (TEFRA) Resolution, approve the indemnification agreement and approve the loan agreement for the rehabilitation of affordable housing.
7.c Continued Public Appeal Hearing of Planning Commission’s Approval of Vesting Tentative Tract Map 7451 (Phased) and its Mitigated Negative Declaration.
McIntosh & Associates, representing Diamond Farming Company, is proposing to subdivide 40.77 acres into 313 single-family residential lots, 1 multi-use trail lot, and 1 park lot in the R-2 (Small Lot Single-Unit Dwelling) zone located generally southeast of Olive Drive and Santa Fe Way. (Ward 4)
Consideration of a resolution adopting the Mitigated Negative Declaration pursuant to the California Environmental Quality Act and approving Vesting Tentative Tract Map No. 7451 (Phased).
The Sierra Club submitted an appeal to the Planning Commission’s approval of the request. Sierra Club and McIntosh & Associates are requesting additional continuance
City staff recommends continuing the appeal hearing to the regularly scheduled meeting on January 20, 2027.
8. HEARINGS
8.a Public Hearing on Findings and Adoption of Willdan Energy Savings Performance Contract for Fleet Electrification
Resolution making findings and authorizing an Energy Savings Performance Contract for fleet electrification and electric vehicle infrastructure improvements.
1. Agreement with Willdan Energy Solutions for an amount not to exceed $19,922,436 to implement energy efficiency measures, operating cost-saving measures and equipment, and energy generation measures supporting the City’s transition to an electric fleet.
2. Appropriate $4,662,996 from the Equipment Fund, $8,263,243 from the Solid Waste Fund, $4,346,005 from the Wastewater Fund, and $1,650,192 from the Domestic Water Fund, for a total appropriation of $18,922,436 into the Public Works Capital Improvement Program Budget.
3. Staff recommends opening the public hearing, taking public testimony, adoption of the resolution, approval of the contract, and appropriation of funds.
9. REPORTS
9.a Referral Outcome to Recognize Irma Carson
Presentation
Staff recommend approval for naming the new community center at MLK Park the Irma Carson Legacy Center and creating a bust of Irma Carson’s image.
10. DEFERRED BUSINESS
11. NEW BUSINESS
12. COUNCIL AND MAYOR STATEMENTS
13. CLOSED SESSION
14. ADJOURNMENT
BAKERSFIELD CITY COUNCIL
MINUTES
MEETING OF NOVEMBER 4, 2026
Council Chambers, City Hall, 1501 Truxtun Avenue
Regular Meetings –3:30 p.m. and 5:15 p.m.
REGULAR MEETING – 3:30 PM
1. ROLL CALL
Present: Mayor Goh, Vice Mayor Kaur, Councilmembers Smith, Koman and Bashirtash
Absent: Councilmembers Arias, Gonzales and Weir
2. PUBLIC STATEMENTS
2.a. Non-Agenda Item Public Statement
No speakers by phone.
The following spoke in person:
Michael Orloff (written materials provided) made comments regarding Councilmembers absenteeism and cancelled meetings.
2.b. Agenda Item Public Statements
None.
3. APPOINTMENTS
3.a. One appointment to the Youth Commission for Ward 6 Alternate Member for the 2026-27 School Year.
(Staff recommends Council determination.)
City Clerk Drimakis announced that applications for appointment were received from James Roy and Adam Brady.
Councilmember Bashirtash appointed Adam Brady as Ward 6 alternate member.
Motion by Councilmember Bashirtash to appoint Adam Brady, Ward 6 alternate member to the Youth Commission. Motion approved with Councilmembers Arias, Gonzales and Weir absent.
4. REPORTS
None.
5. CLOSED SESSION
5. a. Conference with Legal Counsel - Existing Litigation; Closed Session pursuant to Government Code Section 54956.9(d)(1) for the following two matters:
1. Ruben Rivas Flores v. City of Bakersfield; Jason Gonzalez; Kayla Wainright; Chase Hammons; Jeffrey Martin and Does 1-100, inclusive USDC Eastern District Case No.: 1:24-CV-00229-KES-CDB
2. Mellisa Vazquez v. Bakersfield Police Department; City of Bakersfield; Officer Jay Moore and Does 1-10, individually USDC Eastern District Case No.: 1:25-CV0089-KES-CDB
Bakersfield, California, November 4, 2026 - Page 2
5. CLOSED SESSION continued
item 5.a. continued
Motion by Vice Mayor Kaur to adjourn to Closed Session at 3:38 p.m.
Closed Session meeting was adjourned at 4:15 p.m.
Meeting reconvened at 4:16 p.m.
6. CLOSED SESSION ACTION
5. a. Conference with Legal Counsel - Existing Litigation; Closed Session pursuant to Government Code Section 54956.9(d)(1) for the following two matters:
1. Ruben Rivas Flores v. City of Bakersfield; Jason Gonzalez; Kayla Wainright; Chase Hammons; Jeffrey Martin and Does 1-100, inclusive USDC Eastern District Case No.: 1:24-CV-00229-KES-CDB
City Attorney Gennaro announced staff was given direction by a vote of 4-0 with Councilmembers Arias, Gonzales and Weir absent.
2. Mellisa Vazquez v. Bakersfield Police Department; City of Bakersfield; Officer Jay Moore and Does 1-10, individually USDC Eastern District Case No.: 1:25-CV0089-KES-CDB
City Attorney Gennaro announced staff was given direction by a vote of 4-0 with Councilmembers Arias, Gonzales and Weir absent.
7. Adjournment
Mayor Goh adjourned the 3:30 p.m. meeting at 4:17 p.m.
REGULAR MEETING - 5:15 PM
Bakersfield, California, November 4, 2026 - Page 3
1. ROLL CALL
Present: Mayor Goh, Vice Mayor Kaur, Councilmembers Gonzales, Smith, Koman and Bashirtash
Absent: Councilmembers Arias and Weir
Introduction of students participating in the 70th Teen Government Day.
Anahi Gomez, West High School (Mayor); Manveer Singh, Ridgeview High School (Vice-Mayor Kaur), Javid Snow, Shafter High School (Councilmember Arias); Isaac Ornelas, Bakersfield High School (Councilmember Gonzales); Samantha Romero, Mira Monte High School (Councilmember Weir); Jaritza Frias, Del Oro High School (Councilmember Smith); Lauren Newkirk, East Bakersfield High School (Councilmember Koman), Isabel Reyes, Highland High School (Councilmember Bashirtash); April Gomez, South High School (City Attorney Gennaro); Vincent Rivera, East Bakersfield Memorial High School (City Manager Clegg); Teena Binu, Centennial High School (Assistant to the City Manager); Matthew Lopez, Garces High School (Development Services Director Burns); Hannah Lancaster, North High School (Public Works Director Meyer); Yareli Moreno Perez, Golden Valley High School (City Clerk Drimakis)
2. INVOCATION
by Mary Claire Zimmer, Senior at Bakersfield Christian High School.
3. PLEDGE OF ALLEGIANCE
by Angelo Roman, Senior at Frontier High School.
4. PRESENTATIONS
None.
5. PUBLIC STATEMENTS
5.a. Non-Agenda Item Public Statements
No speakers by phone.
The following spoke in person:
1. Antje Lauer spoke regarding tree survey and opportunities for students to participate. Requested 10 minutes of the Council's time during the next Council meeting on November 18th to provide a report.
2. Albert Rodriguez spoke regarding road conditions in his neighborhood, Oleander Sunset.
5.b. Agenda Item Public Statements
No speakers by phone.
The following spoke in person:
Eddy Laine (written materials provided) spoke in opposition to item 10.a.
Mayor Goh recessed the meeting at 5:45 p.m., meeting reconvened at 5:48 p.m.
6. CONSENT CALENDAR
a. Minutes:
Bakersfield, California, November 4, 2026 - Page 4
6.a.1. Approval of minutes of October 21, 2026, Regular City Council Meetings. (Staff recommends approval of the minutes.)
6.a.2. Review of corrected minutes for May 13, 2026, Regular City Council Meetings. (Staff recommends approval of the minutes.)
b. Payments:
6.b.1. Receive and file department payments from October 7, 2026, to October 20, 2026, totaling $17,375,810.13 as follows: department payments in the amount of $16,985,121.69, and Self Insurance payments in the amount of $390,688.44. (Staff recommends receive and file report.)
6.b.2. Receive and file department agreements over $40,000 and under $100,000 executed between October 7, 2026, to October 20, 2026.
(Staff recommends receive and file report.)
c. Ordinances:
6.c.1. Adoption of an ordinance by amending Bakersfield Municipal Code Section 17.06.020 changing the official prezone classification from OS (Open Space) and A (Agriculture) to RE (Recreation) zone and its proposed mitigated negative declaration, on approximately 9.3 acres generally located northeast of Jenkins Road and Austin Creek Avenue for Zone Change 24-0004. The applicant is Provost and Pritchard, representing North of the River Recreation and Park District (NOR) (property owner). (Ward 4)
(Staff and the Planning Commission recommends adoption of the ordinance.) ORD 5223
d. Resolutions:
6.d.1. Resolutions confirming approval by the City Manager designee of the following Code Enforcement Manager’s reports regarding assessments of certain properties in the City for which structures have been secured against entry or for the abatement of certain weeds, debris and waste matter and the demolishment of dangerous buildings and authorizing collection of the assessments by the Kern County Tax Collector for the following months:
(Staff recommends adoption of the resolutions.)
1. September
RES 131-2026
2. October
RES 132-2026
6.d.2. Resolution determining that Dell storage hardware and equipment can most efficiently be procured through cooperative procurement bidding procedures from The Drala Project, Inc. dba The Redesign Group and authorizing the Finance Director to dispense with competitive bidding for the purchase of Dell storage hardware and equipment in the amount not to exceed $500,000 for the Technology Services Department.
(Staff recommends adoption of the resolution.)
RES 133-2026
6. CONSENT CALENDAR continued
Bakersfield, California, November 4, 2026 - Page 5
6.d.3. Resolution of Intention No. 2285 to order the vacation of a portion of the alley right-of-way located in Block 143 and the PUE located within Inyo Street located between 18th Street and the Alley of Block 143 & 144.
(Staff recommends adoption of the resolution.)
ROI 2285
6.e. Job Specifications and Salary Updates
None.
6.f. Agreements:
6.f.1. Appropriate Homekey+ Grant Funding and Agreement with Community Action Partnership of Kern
(Staff recommends Council appropriate the Homekey+ Grant Funds in accordance with Resolution 140-2025 and approve the Agreement with Community Action Partnership of Kern County (CAPK))
1. Appropriate $14,074,000 Homekey+ California Housing and Community Development Grant Funds to ECD Other Grant Awards Fund in the Development Services Operating Budget; and
2. Approve Agreement with Community Action Partnership (CAPK) to provide Homekey+ and Homeless Housing, Assistance and Prevention Round 5 (HHAP-5) funds for the development and operation of the Ramkabir Permanent Supportive Housing Project at 901 Union Avenue. (Ward 2) AGR 2026-194
6.f.2. Agreement with Clean Energy (not to exceed $200,000) to continue performing inspections, maintenance, and repairs of the Liquefied and Compressed Natural Gas (LCNG) fueling facilities located at the Corporation Yard and South Mt. Vernon Avenue.
(Staff recommends approval of the agreement.)
AGR 2026-195
6.f.3. Environmental Impact Report (EIR) for General Plan Amendment Zone Change No. 24-0514 and Williamson Act Cancelation No. 26-0001:
(Staff recommends approval of the agreements and appropriate the funds.)
1. Applicant/Reimbursement Agreement with BT Development II, LLC, ($332,144) for the preparation of an EIR.
AGR 2026-196
2. Consultant Agreement with FirstCarbon Solutions ($276,787) to prepare EIR.
AGR 2026-197
3. Appropriate $332,144 (BT Development II, LLC contribution) to the Development Services Operating budget in the General Fund.
6.f.4. Amendment No. 1 to Agreement No. 2025-070 with Green Machine Sales, LLC (extend term to November 14, 2027) for the design and build of the Materials Recovery Facility (MRF) sorting line. (Ward 1)
(Staff recommends approval of the amendment.)
AGR 2025-070 (1)
6. CONSENT CALENDAR continued
6.f.5. Amendment No.12 to Agreement No.19-070 with AECOM Technical Services Inc.
Bakersfield, California, November 4, 2026 - Page 6
(AECOM) (increasing compensation $172,938.58; revised not to exceed $26,570,068.32), for Construction Management Services on the Thomas Roads Improvement Program Centennial Corridor Mainline Project. (Wards 2 & 3) (Staff recommends approval of the amendment.)
AGR 19-070 (12)
6.g. Bids:
6.g.1. Median Improvements at Various Locations:
(Staff recommends acceptance of low bid, approval of contract, and approval of City-controlled contingency.)
1. Accept bid and approve contract with Cen-Cal Construction ($1,025,000).
AGR 2026-198
2. Authorize staff to approve, as necessary, up to $50,000 in City-controlled contingency for unforeseen conditions encountered during construction of project. (Wards 6 & 7)
6.h. Miscellaneous:
6.h.1. Appropriate $10,600 from the California Fire Foundation charitable donation to the Fire Department General Fund Operating Budget to purchase wildland packs. (Staff recommends approval of the appropriation.)
6.h.2. Fiscal Year 2025-26 Annual Compliance Report for Park Impact Fees prepared in accordance with California Government Code §66006.
(The Fiscal Year 2025-26 Annual Compliance Report for Park Impact Fees is now available for review.)
6.i. Successor Agency Business:
6.i.1. Receive and file Successor Agency payments from October 7, 2026, to October 20, 2026, in the amount of $4,620.00.
(Staff recommends report be received and filed.)
6.j. Public Safety/Vital Services Measure:
None.
City Clerk Drimakis announced staff memorandums were provided regarding Consent Calendar items 6.c.1. clarifying that first reading of ordinance took place October 21, 2026, and 6.f.1. transmitting the signed agreement.
Motion by Vice Mayor Kaur to adopt Consent Calendar items 6.a. through 6.j. Motion approved with Councilmembers Arias and Weir absent.
7. CONSENT CALENDAR PUBLIC HEARINGS
7.a. Public Hearing for the Prohousing Designation Program Application and Adoption of Resolution authorizing an application to apply and participate in the Department of Housing and Community Development Prohousing Designation Program. (Staff recommends opening the public hearing, receiving comment and adoption of the resolution.)
RES 134-2026
7. CONSENT CALENDAR PUBLIC HEARINGS continued
7.b. Public hearing to consider the Planning Commission’s approval of General Plan Amendment No. 23-0001 and its proposed Environmental Impact Report (EIR).
Bakersfield, California, November 4, 2026 - Page 7
Coffee Road Ventures, LLC is proposing a General Plan Amendment, adoption of California Environmental Quality Act (CEQA) Section 15091 Findings, CEQA Section 15093 Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program, and certification of the Final Environmental Impact Report on approximately
46.16 acres located on the southwest corner of Rosedale Highway and Coffee Road. (Ward 4)
(Staff and the Planning Commission recommend adoption of the resolutions.) The request includes:
1. Resolution certifying the Final Environmental Impact Report (FEIR) pursuant to the California Environmental Quality Act (CEQA) Section 15091 Findings, Section 15093 Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program.
2. Resolution adopting a General Plan Amendment to change the land use designation from P (Public Facilities) to LI (Light Industrial).
REMOVED FOR SEPARATE CONSIDERATION. See page 6.
City Clerk Drimakis announced that a staff memorandum was provided transmitting correspondence.
Consent Calendar Public Hearings items 7.a. and 7.b. opened at 5:50 p.m.
City Clerk Drimakis announced a request was received to remove Consent Calendar Public Hearings item 7.b. for separate discussion.
Consent Calendar Public Hearings item 7.a. closed at 5:51 p.m.
Motion by Vice Mayor Kaur to adopt Consent Calendar Public Hearings item 7.a.
Motion approved with Councilmembers Arias and Weir absent.
8. HEARINGS
7.b. Public hearing to consider the Planning Commission’s approval of General Plan Amendment No. 23-0001 and its proposed Environmental Impact Report (EIR).
Coffee Road Ventures, LLC is proposing a General Plan Amendment, adoption of California Environmental Quality Act (CEQA) Section 15091 Findings, CEQA Section 15093 Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program, and certification of the Final Environmental Impact Report on approximately
46.16 acres located on the southwest corner of Rosedale Highway and Coffee Road. (Ward 4)
(Staff and the Planning Commission recommend adoption of the resolutions.) The request includes:
1. Resolution certifying the Final Environmental Impact Report (FEIR) pursuant to the California Environmental Quality Act (CEQA) Section 15091 Findings, Section 15093 Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program.
RES 135-2026
2. Resolution adopting a General Plan Amendment to change the land use designation from P (Public Facilities) to LI (Light Industrial).
RES 136-2026
8. HEARINGS continued
item 7.b. continued
Development Services Director Burns made staff comments and provided a PowerPoint presentation.
Bakersfield, California, November 4, 2026 - Page 8
The following spoke in opposition: Aiden Marshall
The following spoke in favor: Kristin Hagan, Jessie Barkley, Brett Thorton, Richard Chapman
Rebut in opposition: Aiden Marshall
Rebut in favor: Kristin Hagan, Alexander Powell
Hearings item 7.b. closed at 6:21 p.m.
Motion by Councilmember Smith to support staff recommendations on item 7.b.
Motion approved with Councilmembers Arias and Weir absent.
9. REPORTS
10.a. Accept bid for the purchase of 15-gallon and 24-inch box trees from Zack’s Big Trees & Nursery in the amount of $274,413.75 for the Recreation and Parks Department. (Staff recommends acceptance of the bids.)
City Clerk Drimakis announced that a staff memorandum was provided transmitting correspondence received.
Councilmember Gonzales recused himself due to a campaign contribution.
Mayor Goh called for a recess at 6:27 p.m., meeting reconvened at 6:40 p.m.
Assistant City Manager Anthony made staff comments and provided a PowerPoint presentation. City Manager Clegg made additional staff comments.
Motion by Vice Mayor Kaur to accept bid. Motion approved with Councilmember Gonzales abstaining and Councilmembers Arias and Weir absent.
11. DEFERRED BUSINESS
None.
12. NEW BUSINESS
12.a. Resolution setting dates of the Regular City Council Meetings, Department Budget Presentations and Budget Hearing Calendar for January through December 2027. (Staff recommends Council adopt the resolution.)
RES 137-2026
City Manager Clegg made staff comments.
Motion by Vice Mayor Kaur to adopt the resolution. Motion approved with Councilmembers Arias and Weir absent.
13. COUNCIL AND MAYOR STATEMENTS
Councilmember Gonzales announced his election to Assembly District and announced his resignation as of November 18, 2026.
Bakersfield, California, November 4, 2026 - Page 9
14. ADJOURNMENT
Mayor Goh adjourned the meeting at 7:00 p.m.
______________________________
KAREN GOH
MAYOR of the City of Bakersfield
ATTEST:
___________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
Bakersfield, California, November 4, 2026 - Page 10
***THIS PAGE INTENTIONALLY LEFT BLANK***
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Department Payments and Agreements TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 4, 2026
SUBJECT: Receive and file payments from October 21, 2026, to November 3, 2026, totaling $28,850,196.65 as follows: department payments in the amount of $27,998,925.97, and Self Insurance payments in the amount of $851,270.68.
RECOMMENDATION:
Staff recommends receiving and filing the report.
BACKGROUND:
In accordance with Bakersfield Municipal Code Section 2.08.020 the Finance Director must report the City's disbursements periodically to the City Council.
FISCAL IMPACT:
$28,850,196.65.
COUNCIL GOAL:
Innovative and Efficient City Government
ATTACHMENTS:
1. 1-AP Check Register 11.18.26
2. Oracle AP Check Register 11.18.26
11/4/2026 CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 1
Check Number Vendor Number Vendor Name Check Date Check Amount 775631 10204 ASSOCIATION BKFD POLICE OFFICER FCU Oct 23, 2026 $23,311.86 775632 10200 BAKERSFIELD CITY FIREFIGHTERS Oct 23, 2026 $7,349.10 775633 10211 BAKERSFIELD FIREMEN Oct 23, 2026 $14,301.27 775634 10203 BAKERSFIELD POLICE BENEFIT Oct 23, 2026 $33,899.36 775635 10205 MUTUAL BENEFIT ASSOCIATION Oct 23, 2026 $870.14 775636 26810 RELIASTAR LIFE INSURANCE CO Oct 23, 2026 $4,559.24 775637 22324 SEIU LOCAL 521 Oct 23, 2026 $22,623.04
775638 33184 EYEMED Oct 29, 2026 $5,574.76
775639 26810 RELIASTAR LIFE INSURANCE CO Oct 29, 2026 $4,851.06 775640 10047 MISC RECEIVABLE REFUND VENDOR Oct 29, 2026 $1,903.62 775641 30027 U S BANK - PARS #6746022400 Oct 29, 2026 $1,859.17 775642 30029 UNITED CONCORDIA DENTAL PLANS OF CA Oct 29, 2026 $68,818.01 775643 30020 UNUM Oct 29, 2026 $6,800.79
9997979 30025 STATE DISBURSEMENT UNIT Oct 22, 2026 $18,124.60 9997980 10199 BAKERSFIELD CITY EMPLOYEE Oct 23, 2026 $202,391.00 9997981 30014 EMPLOYMENT DEVELOPMENT DEPT Oct 23, 2026 $354,664.08 9997982 10217 I C M A RETIREMENT TRUST-303749 Oct 23, 2026 $58,696.85 9997983 30010 IRS Oct 23, 2026 $923,192.20
9997984 16863 NATIONWIDE RETIREMENT SOLUTIONS Oct 23, 2026 $170,436.26 9997985 20699 VANTAGEPOINT TRANSFER AGENTS C/O Oct 23, 2026 $69,604.67 9997987 30028 BLUE SHIELD OF CALIFORNIA-P Oct 29, 2026 $804,227.24 9997988 30022 IRS / FDRF Oct 29, 2026 $101.00
9997989 30021 KAISER PERMANENTE Oct 29, 2026 $376,439.07 9997990 10206 STATE OF CALIF - PERS Oct 29, 2026 $1,609,270.24 24 Overall - Count
Overall - Total $4,783,868.63
$4,783,868.63
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 1
Payment
Number Fund Vendor Name Check Date Check Amount
825030 5210 DAVID E DOWDY 10/22/2026 $ 1,440.00
825046 5210 Taylor R Wofford 10/22/2026 $ 122.00
825129 5210 AIMS C/O HANNA BROPHY MACLEAN 10/22/2026 $ 14,253.00 825130 5210 AIMS C/O YRULEGUI & ROBERTS APC 10/22/2026 $ 2,047.24 825135 5210 ALLIANT INSURANCE SERVICES, INC 10/22/2026 $ 156,833.60 825215 5210 FEDEX 10/22/2026 $ 171.87
825239 5210 HANNA BROPHY MACLEAN MCALEER & JENSEN L 10/22/2026 $ 337.50 825323 5210 PRISM 10/22/2026 $ 320.93
825326 5210 PURPOSE BUILT TRADE CO 10/22/2026 $ 626.14
825352 5210 SMITH SYSTEM DRIVER IMPROVEMENT 10/22/2026 $ 7,620.00 825390 5210 Andreina C Cruz 10/29/2026 $ 248.08
825401 5210 CLIFFORD & BROWN 10/29/2026 $ 27,500.00
825405 5210 Jena L Covey 10/29/2026 $ 128.00
825409 5210 MARDEROSIAN & COHEN 10/29/2026 $ 160,000.00 825475 5210 AIMS C/O HANNA BROPHY MACLEAN 10/29/2026 $ 4,446.50 825476 5210 AIMS C/O YRULEGUI & ROBERTS APC 10/29/2026 $ 15,812.92 825477 5210 Albert G Gomez 10/29/2026 $ 160.00
825507 5210 Branden M Rice 10/29/2026 $ 160.00
825513 5210 Carlos I Celio 10/29/2026 $ 160.00
825522 5210 CHRISTINA A ABSHIRE 10/29/2026 $ 5,289.99
825532 5210 CRYSTAL HOFFMANN - REFUND 10/29/2026 $ 3,537.01 825560 5210 FEDEX 10/29/2026 $ 86.66
825584 5210 HANNA BROPHY MACLEAN MCALEER & JENSEN L 10/29/2026 $ 2,470.00 825605 5210 Joseph N Espinoza 10/29/2026 $ 160.00
825647 5210 LUCY BROWN - REFUND 10/29/2026 $ 3,574.77
825649 5210 MARCOS TORRES 10/29/2026 $ 2,353.66
825657 5210 MEMORIAL OCCUPATIONAL MEDICINE 10/29/2026 $ 220.00 825718 5210 SMART & FINAL IRIS COMPANY 10/29/2026 $ 51.91 9998634 5210 WELLS FARGO BANK 10/22/2026 $ 190,167.50
9998636 5210 WELLS FARGO BANK 10/29/2026 $ 250,971.40
825016 4310 A T & T 10/22/2026 $ 199.93
825017 5110 CALIFORNIA DEPARTMENT OF TAX AND FEE AD 10/22/2026 $ 3,993.00 825019 4120 CALIFORNIA WATER SERVICE 10/22/2026 $ 60,861.52 825020 0140 Christi Tenter 10/22/2026 $ 148.00
825028 0110 CITY OF BAKERSFIELD 10/22/2026 $ 56,171.75
825029 5110 COAST COUNTIES TRUCK & EQUIPMENT 10/22/2026 $ 3,025,205.35 825031 0140 DEPARTMENT OF JUSTICE 10/22/2026 $ 277.00
825032 0140 Isabel C Farmer 10/22/2026 $ 148.00
825033 0140 Jordan M Barker 10/22/2026 $ 299.00
825034 0140 Luis Baez Cervantez 10/22/2026 $ 299.00
825035 0140 Maricruz Blowers 10/22/2026 $ 148.00
825036 0140 MERCY HOUSE LIVING CENTERS 10/22/2026 $ 495,609.50 825037 0140 Michael J Williams 10/22/2026 $ 299.00
825041 4210 PACIFIC GAS & ELECTRIC COMPANY 10/22/2026 $ 368,901.18 825043 0140 Shayla N Woods-Collins 10/22/2026 $ 148.00
825044 0110 SOCALGAS 10/22/2026 $ 77.22
825045 0110 SOCALGAS 10/22/2026 $ 347.25
825050 4210 ADVANCED DISTRIBUTION CO 10/22/2026 $ 31,355.51 825054 5110 ALUMINUM CHUCK WAGON 10/22/2026 $ 22,136.83 825057 0110 BOUND TREE MEDICAL LLC 10/22/2026 $ 11,920.08 825061 0110 BRADY INDUSTRIES 10/22/2026 $ 7,232.63
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 2
Payment
Number Fund Vendor Name Check Date Check Amount
825063 1520 CEN-CAL CONSTRUCTION INC 10/22/2026 $ 588,774.93 825067 0110 CLIFFORD & BROWN 10/22/2026 $ 151,263.71
825069 5110 COAST COUNTIES TRUCK & EQUIPMENT 10/22/2026 $ 4,094.56 825071 5110 FAST UNDERCAR LLC 10/22/2026 $ 5,423.08
825073 4120 GRAINGER INC, W W 10/22/2026 $ 4,869.72
825075 1510 GRANITE CONSTRUCTION INC 10/22/2026 $ 1,560,236.15 825079 3120 HOME DEPOT 10/22/2026 $ 6,280.89
825081 5110 JIM BURKE FORD 10/22/2026 $ 17,173.82
825083 0110 KERN TURF SUPPLY 10/22/2026 $ 7,607.61
825085 4120 LOWES HOME IMPROVEMENT 10/22/2026 $ 1,918.49 825089 5110 MICHELIN NORTH AMERICA INC 10/22/2026 $ 31,215.50 825091 0110 O'CONNOR PEST CONTROL 10/22/2026 $ 1,010.00 825093 5110 O'REILLY AUTO PARTS 10/22/2026 $ 1,427.78
825095 5110 QUINN COMPANY INC 10/22/2026 $ 52,319.52
825099 0140 STINSON STATIONERS 10/22/2026 $ 14,362.70
825111 4410 UNIFIED FIELD SERVICES CORPORATION 10/22/2026 $ 350,781.55 825114 4120 VESTIS SERVICES LLC 10/22/2026 $ 2,447.59
825115 5110 A T & T 10/22/2026 $ 1,460.24
825116 0110 A T & T 10/22/2026 $ 875.00
825117 5110 A T & T 10/22/2026 $ 2,562.10
825118 0110 A T & T MOBILITY 10/22/2026 $ 46.81
825119 5110 A-1 ALTERNATIVE FUEL SYSTEMS 10/22/2026 $ 1,281.18 825120 0140 ABC SUPPLY INTERIORS INC 10/22/2026 $ 1,243.88 825121 3160 ABSL CONSTRUCTION 10/22/2026 $ 27,300.00
825122 0110 ACC BUSINESS 10/22/2026 $ 160.00
825123 4110 ACCELERATED ENVIRONMENTAL SERVICES INC 10/22/2026 $ 23,795.00 825124 1210 ACCENTURE INFRASTRUCTURE AND CAPITAL PR 10/22/2026 $ 155,688.74 825125 0110 ADVANCED DATA STORAGE INC 10/22/2026 $ 465.59 825126 4410 AECOM TECHNICAL SERVICES INC 10/22/2026 $ 9,280.00 825127 5110 AEP CALIFORNIA LLC 10/22/2026 $ 757.87
825128 5110 AGILITY FUEL SYSTEMS INC 10/22/2026 $ 1,370.93 825131 4210 ALBERT JOHNSON - REFUND 10/22/2026 $ 51.79
825132 0110 ALEX BERNAL 10/22/2026 $ 225.00
825133 0110 ALEXANDER RODRIGUEZ 10/22/2026 $ 50.00
825134 4110 ALL AMERICAN CARPET 10/22/2026 $ 26,464.00
825136 4310 ALLIED WEED CONTROL INC 10/22/2026 $ 3,400.00 825137 1740 ALLSTAR FIRE EQUIPMENT 10/22/2026 $ 13,199.18 825138 1810 Amanda C Gracia 10/22/2026 $ 132.00
825139 5110 AMAROK LLC 10/22/2026 $ 31,648.89
825140 0110 AMERICAN FABRICATION 10/22/2026 $ 2,706.25
825141 0110 AMERICAN SAFETY SERVICES INC 10/22/2026 $ 226.37 825142 1110 AMERINATIONAL COMMUNITY SERVICES INC 10/22/2026 $ 3,174.48 825143 0110 AMS LEGAL SUPPORT SERVICES INC 10/22/2026 $ 19.90 825144 0110 Andrae Gonzales 10/22/2026 $ 489.88
825145 0110 Andrea Murillo 10/22/2026 $ 2,289.00
825146 0110 Andrew D Burich 10/22/2026 $ 213.00
825147 0110 ANTHONY BACA 10/22/2026 $ 100.00
825148 5110 APPLIED LNG TECHNOLOGIES LLC 10/22/2026 $ 10,348.51 825149 9110 ARMTECH CO INC 10/22/2026 $ 788.94
825150 0110 ASELA ENVIRONMENTAL INC 10/22/2026 $ 2,862.00 825151 5110 AUTOZONE STORES INC 10/22/2026 $ 100.73
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 3
Payment
Number Fund Vendor Name Check Date Check Amount
825152 0110 AWP SAFETY 10/22/2026 $ 1,011.02
825153 5110 B & B SURPLUS 10/22/2026 $ 203.29
825154 4410 B & R TOOL SUPPLY INC 10/22/2026 $ 1,249.52 825155 0110 B S & E COMPANY INC 10/22/2026 $ 190.52
825156 4110 BACSCO 10/22/2026 $ 309.76
825157 0110 BAKER SUPPLIES AND REPAIRS 10/22/2026 $ 1,460.03 825158 4410 BAKERSFIELD CALIFORNIAN 10/22/2026 $ 1,009.78 825159 0110 BAKERSFIELD IRRIGATION 10/22/2026 $ 9,687.94 825160 0110 BAKERSFIELD PLUMBING CO INC 10/22/2026 $ 541.00 825161 5110 BAKERSFIELD TRUCK CENTER 10/22/2026 $ 154,326.06 825162 3120 BARNES WELDING SUPPLY 10/22/2026 $ 146.59
825163 0140 BE FINALLY FREE INC 10/22/2026 $ 69,837.29
825164 5110 BERCHTOLD EQUIPMENT CO 10/22/2026 $ 245.07
825165 5110 BLACKHOLE TECHNOLOGIES INC 10/22/2026 $ 37,353.43 825166 1210 BLUEPRINT SERVICE CO 10/22/2026 $ 916.67
825167 5110 BOBS WHOLESALE AUTO GLASS 10/22/2026 $ 315.01 825168 5110 BORN AGAIN BODYWORKS 10/22/2026 $ 16,425.04 825169 4210 BOWMAN ASPHALT 10/22/2026 $ 21,000.00
825170 4120 BRANDCO 10/22/2026 $ 1,893.23
825171 0110 Brenda De La Garza 10/22/2026 $ 294.00
825172 5110 BROCKS TRAILER 10/22/2026 $ 270.63
825173 4110 BSK ASSOCIATES 10/22/2026 $ 16,037.72
825174 3120 BUDGET BOLT INC 10/22/2026 $ 1,061.39
825175 5110 CAL VALLEY EQUIPMENT INC 10/22/2026 $ 454.38 825176 5110 CALIFORNIA FUELS & LUBRICANTS 10/22/2026 $ 89,239.23 825177 0140 CALIFORNIA PUBLIC POLICY GROUP INC 10/22/2026 $ 13,500.00 825178 0110 Cari Cowling 10/22/2026 $ 300.00
825179 0110 Carina Y Ortiz 10/22/2026 $ 72.46
825180 0110 Carlos Arvizu 10/22/2026 $ 471.00
825181 0110 Carson L Puryear 10/22/2026 $ 1,372.00
825182 3160 CENTENNIAL ASPHALT COMPANY 10/22/2026 $ 9,203.57 825183 3120 CHAMPION HARDWARE 10/22/2026 $ 2,369.11
825184 5110 CHESTER AVENUE BRAKE & SUPPLY 10/22/2026 $ 39.45 825185 0110 Christian T Clegg 10/22/2026 $ 501.94
825186 0140 CITIGUARD INC 10/22/2026 $ 55,650.24
825187 5110 CLEAN ENERGY INC 10/22/2026 $ 561.00
825188 5110 COASTLINE EQUIPMENT 10/22/2026 $ 1,646.47
825189 0110 COLANTUONO HIGHSMITH & WHATLEY PC 10/22/2026 $ 21,232.00 825190 9110 COLLINS ELECTRIC-EUREKA 10/22/2026 $ 1,038.75 825191 0110 CONSOLIDATED ELECTRICAL DISTRIBUTORS IN 10/22/2026 $ 324.75 825192 4110 COOPERS PETROLEUM DISTRIBUTOR INC 10/22/2026 $ 1,941.59 825193 4120 CRIDER CONSTRUCTION INC 10/22/2026 $ 18,453.66 825194 0110 CRITTERS WITHOUT LITTERS 10/22/2026 $ 3,793.00 825195 6150 CROSSING AT HOSKING LLC-REFUND 10/22/2026 $ 87,616.00 825196 0110 CUMMINS SALES AND SERVICE 10/22/2026 $ 2,016.18 825197 0110 CURTIS BLUE LINE 10/22/2026 $ 15,748.26
825198 5110 DAVES FLEET MAINT & TOWING INC 10/22/2026 $ 50.00 825199 4120 DAVID JANES COMPANY 10/22/2026 $ 1,396.81
825200 4110 DC FROST ASSOCIATES INC 10/22/2026 $ 53,860.14 825201 4110 DEAN MELVIN - REFUND 10/22/2026 $ 717.13
825202 4310 DEE JASPAR & ASSOCIATES INC 10/22/2026 $ 5,634.46 S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 4
Payment
Number Fund Vendor Name Check Date Check Amount
825203 5110 DELL MARKETING L P 10/22/2026 $ 1,729.74
825204 0110 Doretha A Wyatt 10/22/2026 $ 132.00
825205 5110 DUNN EDWARDS CORPORATION 10/22/2026 $ 97.74 825206 5110 E J WARD INCORPORATED 10/22/2026 $ 1,052.37 825207 1810 EAN SERVICES LLC 10/22/2026 $ 21,929.79
825208 5110 ELBERT DISTRIBUTING 10/22/2026 $ 1,031.70
825209 0110 Eli D Brown 10/22/2026 $ 1,372.00
825210 9110 ELITE CONSTRUCTION 10/22/2026 $ 171.40
825211 0110 ENTENMANN ROVIN CO 10/22/2026 $ 1,089.14
825212 1740 ENVIRONMENTAL SAFETY SOLUTIONS 10/22/2026 $ 151.55 825213 0110 Eric C Hearn 10/22/2026 $ 471.00
825214 0110 FASTENAL COMPANY 10/22/2026 $ 1,590.99
825216 4110 FERGUSON ENTERPRISES INC 10/22/2026 $ 300.54 825217 0140 FIRST AMERICAN TITLE COMPANY 10/22/2026 $ 682.00 825218 0120 FIRST CHOICE COFFEE SERVICES INC 10/22/2026 $ 827.23 825219 5110 FLEET PRIDE INC 10/22/2026 $ 265.06
825220 5110 FLEET SERVICES TOWING INC 10/22/2026 $ 100.00 825221 0110 FLOOD BAKERSFIELD MINISTRIES 10/22/2026 $ 31,060.34 825222 4210 FLS SUPPLY 10/22/2026 $ 374.55
825223 0110 FORVIS MAZARS LLP 10/22/2026 $ 6,489.00
825224 4120 G S E CONSTRUCTION CO INC 10/22/2026 $ 99,595.00 825225 0110 GARDENERS SUPPLY INC 10/22/2026 $ 759.92
825226 0110 GCI EQUIPMENT RENTAL 10/22/2026 $ 1,884.04
825227 0110 GENERAL CODE LLC 10/22/2026 $ 78.00
825228 0140 GENERAL PRODUCTION SERVICE OF CALIFORNI 10/22/2026 $ 10,388.00 825229 0110 GENERAL TREE SERVICE INC 10/22/2026 $ 7,384.00 825230 5110 GLOBAL CTI GROUP 10/22/2026 $ 2,400.00
825231 0110 GLOBALSTAR USA INC 10/22/2026 $ 107.54
825232 5110 GOLDEN EMPIRE TOWING INC 10/22/2026 $ 2,527.00 825233 4120 GRAYBAR ELECTRIC COMPANY 10/22/2026 $ 1,220.35 825234 5110 GREGS PETROLEUM SERVICES INC 10/22/2026 $ 7,998.35 825235 5110 H & S BODY WORKS & TOWING 10/22/2026 $ 50.00 825236 5110 H&H AUTO PARTS WHOLESALE 10/22/2026 $ 796.55 825237 5110 HADDAD DODGE 10/22/2026 $ 3,107.92
825238 0110 HALL LETTER SHOP 10/22/2026 $ 1,667.01
825240 3110 HPS MECHANICAL INC 10/22/2026 $ 6,691.00
825241 5110 HYDRAULIC CONTROLS INC 10/22/2026 $ 46.74
825242 4120 INDUSTRIAL ELECTRIC CONSTRUCTION & MAIN 10/22/2026 $ 28,354.44 825243 0120 INFRASTRUCTURE ENGINEERS A BOWMAN COMPA 10/22/2026 $ 8,424.00 825244 1910 INNOVATIVE CONCERT LIGHTING INC 10/22/2026 $ 9,178.50 825245 3120 J & E RESTAURANT SUPPLY INC 10/22/2026 $ 180.24 825246 4210 JACK DAVENPORT SWEEPING SERVICE INC 10/22/2026 $ 91,667.00 825247 0110 Jacob C Heinsohn 10/22/2026 $ 471.00
825248 9110 JAI DRYWALL 10/22/2026 $ 1,474.95
825249 0110 Jason C Kingsley 10/22/2026 $ 153.02
825250 0110 Jeffery S Cecil 10/22/2026 $ 242.44
825251 5110 JERRY & KEITHS INC 10/22/2026 $ 2,939.37
825252 6110 JIMMY TAMSI-REFUND 10/22/2026 $ 0.68
825253 3120 JIMS STEEL SUPPLY 10/22/2026 $ 197.83
825254 0110 Jonathan E Van Dyke 10/22/2026 $ 127.00
825255 0110 Jordan A Lee 10/22/2026 $ 127.00
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 5
Payment
Number Fund Vendor Name Check Date Check Amount
825256 4210 JORGENSEN & CO 10/22/2026 $ 348.62
825257 0140 Juan M Heredia 10/22/2026 $ 1,265.09
825258 4210 K & I SERVICES INC 10/22/2026 $ 819.00
825259 5110 K & R TOWING 10/22/2026 $ 50.00
825260 5110 KELLAR EQUIPMENT HOSE AND REPAIR INC 10/22/2026 $ 10,901.74 825261 3160 KERN ASPHALT PAVING & SEALING 10/22/2026 $ 46,276.10 825262 0140 KERN BEHAVIORAL HEALTH AND RECOVERY 10/22/2026 $ 88,035.97 825263 3120 KERN BUILDING MATERIALS 10/22/2026 $ 74.91
825264 9110 KERN BUILDING MATERIALS CO 10/22/2026 $ 1,068.70 825265 1170 KERN COUNTY BLACK CHAMBER OF COMMERCE 10/22/2026 $ 249.59 825266 0110 KERN COUNTY FORENSIC SERVICES LLC 10/22/2026 $ 1,500.00 825267 0140 KERN ECONOMIC DEVELOPMENT CORPORATION 10/22/2026 $ 5,000.00 825268 4110 KERN ELECTRIC DISTRIBUTORS 10/22/2026 $ 4,685.93 825269 5110 KERN MACHINERY INC 10/22/2026 $ 1,873.85
825270 0110 KERN MEDICAL 10/22/2026 $ 3,303.10
825271 0110 KERN PRINT SERVICES INC 10/22/2026 $ 71.45
825272 4210 KERN REFUSE DISPOSAL, INC 10/22/2026 $ 12,101.10 825273 0110 KERN RIVER POWER EQUIPMENT 10/22/2026 $ 80.70 825274 0120 KIMLEY HORN & ASSOCIATES INC 10/22/2026 $ 16,657.50 825275 4210 KVPRINT 10/22/2026 $ 35.92
825276 9110 KYLE WATTS 10/22/2026 $ 956.50
825277 0110 L N CURTIS & SONS 10/22/2026 $ 16,531.18
825278 0110 Larry Koman 10/22/2026 $ 611.38
825279 0110 Laura L Hannah 10/22/2026 $ 294.00
825280 0110 LEXISNEXIS RISK SOLUTIONS INC 10/22/2026 $ 3,302.40 825281 0140 LIBERA INC 10/22/2026 $ 1,090.90
825282 5110 LIGHTNING X PRODUCTS INC 10/22/2026 $ 1,287.58 825283 4310 LIVE OAK ASSOCIATES INC 10/22/2026 $ 112.50 825284 5110 LONG BEACH BMW MOTORCYCLES 10/22/2026 $ 2,332.13 825285 4110 LOOP ELECTRIC INC 10/22/2026 $ 7,497.05
825286 0110 LSL LLP 10/22/2026 $ 68,490.00
825287 5110 LUCKY SPOT AUTO BODY & PAINT 10/22/2026 $ 1,946.85 825288 5110 MAR-CO EQUIPMENT CORP 10/22/2026 $ 1,359.08 825289 0110 Marlin Kidd 10/22/2026 $ 127.00
825290 0140 MARY VALENTI PHD PSYCHOLOGIST INC 10/22/2026 $ 600.00 825291 5110 MCLELLAN INDUSTRIES INC 10/22/2026 $ 1,012.19 825292 0110 MEDIWASTE DISPOSAL LLC 10/22/2026 $ 40.50
825293 4110 MEYER CIVIL ENGINEERING INC 10/22/2026 $ 1,365.00 825294 0110 MINUTEMAN PRESS 10/22/2026 $ 252.33
825295 1170 MISSION COMMUNITY SERVICES CORP 10/22/2026 $ 9,012.25 825296 0140 MJS SOLUTIONS LLC 10/22/2026 $ 775.00
825297 4120 MOTION INDUSTRIES INC 10/22/2026 $ 866.91
825298 5110 MOTOR CITY SALES & SERVICE 10/22/2026 $ 102.08 825299 0110 MOUNTAIN TEK 10/22/2026 $ 3,023.60
825300 5110 MUNICIPAL MAINTENANCE EQUIP INC 10/22/2026 $ 83.59 825301 5110 MURRAY TRAILER 10/22/2026 $ 178.76
825302 9110 MYNT SYSTEMS 10/22/2026 $ 949.66
825303 5110 NAPA TRUCK & TRAILER 10/22/2026 $ 658.98
825304 4110 NATIONAL OILWELL VARCO LP 10/22/2026 $ 489.65 825305 0140 NOOR PHOTO STUDIOS 10/22/2026 $ 22,050.00
825306 4310 NORTH KERN WATER STORAGE DISTRICT 10/22/2026 $ 3,670.18 S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 6
Payment
Number Fund Vendor Name Check Date Check Amount
825307 0110 OAKLEAF GENERAL ENGINEERING CONSTRUCTIO 10/22/2026 $ 2,727.99 825308 5110 ONE SOURCE PARTS LLC 10/22/2026 $ 4,868.12
825309 0110 OPEN & SHUT ENTERPRISES 10/22/2026 $ 1,058.10 825310 6110 P & A ADMINISTRATION SERVICES INC 10/22/2026 $ 11,244.45 825311 5110 PACIFIC POWER INC 10/22/2026 $ 863.97
825312 0110 PACIFIC RIVER SUPPLY CO INC 10/22/2026 $ 1,589.25 825313 3120 PARSONS TRANSPORTATION GROUP INC 10/22/2026 $ 807,244.52 825314 5110 PARTS AUTHORITY LLC 10/22/2026 $ 66.56
825315 5110 PAYLESS TOWING 10/22/2026 $ 250.00
825316 0110 PAYMENTUS 10/22/2026 $ 147.35
825317 0110 PENSINGER TRAILER RENTALS 10/22/2026 $ 92.43 825318 0110 PEOPLE FACTS LLC 10/22/2026 $ 16.67
825319 4110 PIONEER PAINT 10/22/2026 $ 2,357.91
825320 5110 POWERSTRIDE BATTERY CO INC 10/22/2026 $ 3,882.38 825321 0110 PREMIER OVERHEAD DOOR & GATES 10/22/2026 $ 1,126.84 825322 4210 PRIMO BRANDS 10/22/2026 $ 1,187.29
825324 4610 PRO CLEANER UPPERS 10/22/2026 $ 1,000.00
825325 4310 PROVOST & PRITCHARD CONSULTING INC 10/22/2026 $ 21,949.93 825327 0140 PURVEYOR BRANDING CO 10/22/2026 $ 7,500.00
825328 4210 QCS QUICK CUSTOM SIGNS 10/22/2026 $ 2,754.37 825329 3120 QK 10/22/2026 $ 7,392.00
825330 0110 RANCHO TREE SERVICE 10/22/2026 $ 67,482.75
825331 5110 RANDYS TOWING LLC 10/22/2026 $ 100.00
825332 0110 RAYMONDS TROPHY AND AWARDS INC 10/22/2026 $ 232.20 825333 3110 REFRIGERATION SUPPLIES DIST. INC 10/22/2026 $ 3,945.90 825334 4110 RELEVANT SOLUTIONS LLC 10/22/2026 $ 4,606.32 825335 0110 Renee S Garcia 10/22/2026 $ 471.00
825336 3110 RLH FIRE PROTECTION 10/22/2026 $ 5,789.25
825337 1510 ROADLINE PRODUCTS INC 10/22/2026 $ 4,996.25 825338 0110 ROBERT FOX 10/22/2026 $ 475.00
825339 6110 ROSA ESQUIVEL-REFUND 10/22/2026 $ 269.10
825340 0110 S3 CONSULTING SOLUTION 10/22/2026 $ 4,200.00 825341 0110 SALCIDO, DANIEL 10/22/2026 $ 275.00
825342 5110 SAN JOAQUIN TIRES & WHEELS 10/22/2026 $ 299.85 825343 0110 Savannah D Alvarez 10/22/2026 $ 47.00
825344 3120 SCP DISTRIBUTORS LLC 10/22/2026 $ 4,972.40
825345 5110 SEHI COMPUTER PRODUCTS INC 10/22/2026 $ 295.03 825346 3120 SEQUOIA PAINT ENTERPRISE 10/22/2026 $ 399.26 825347 0110 SHERWIN WILLIAMS COMPANY 10/22/2026 $ 120.37 825348 1910 SHRPA INC 10/22/2026 $ 5,775.00
825349 5110 SILVAS OIL CO INC 10/22/2026 $ 10,464.62
825350 0110 SMART & FINAL IRIS COMPANY 10/22/2026 $ 180.50 825351 5110 SMITH & SON TIRE INC 10/22/2026 $ 6,981.39
825353 9110 SOILS ENGINEERING INC 10/22/2026 $ 1,430.95 825354 1520 SOILS ENGINEERING INC 10/22/2026 $ 81,372.00 825355 9110 SOLEX CONTRACTING, INC 10/22/2026 $ 3,447.38 825356 9110 SWEANEY CUSTOM HOMES INC 10/22/2026 $ 630.20 825357 0110 T-MOBILE USA 10/22/2026 $ 315.00
825358 5110 TALLEY COMMUNICATIONS CO INC 10/22/2026 $ 950.64 825359 0110 Taniya Wright 10/22/2026 $ 90.44
825360 0110 TEL TEC SECURITY SYSTEM INC 10/22/2026 $ 50.00 S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 7
Payment
Number Fund Vendor Name Check Date Check Amount
825361 4210 TELSTAR INSTRUMENTS 10/22/2026 $ 23,070.00
825362 5110 TEN EIGHT TOW INC 10/22/2026 $ 50.00
825363 9110 THE HAZMAT TEAM LLC 10/22/2026 $ 1,439.34
825364 4310 THE OPEN DOOR NETWORK 10/22/2026 $ 80,474.50 825365 4120 Theresa L Ng 10/22/2026 $ 522.97
825366 5110 THREE-WAY CHEVROLET 10/22/2026 $ 296.52
825367 6180 TODD GROUNDWATER 10/22/2026 $ 4,883.75
825368 0110 TOTAL LANDSCAPE MAINTENANCE 10/22/2026 $ 950.00 825369 4210 TOTER LLC 10/22/2026 $ 13,130.41
825370 0110 TPX COMMUNICATIONS 10/22/2026 $ 2,912.56
825371 0110 TURF TANK USA INC 10/22/2026 $ 457.26
825372 5110 TYACK TIRES INC 10/22/2026 $ 330.83
825373 0110 U.S. BEHAVIORAL HEALTH PLAN 10/22/2026 $ 1,533.68 825374 4120 UNITED RENTALS NORTH AMERICA INC 10/22/2026 $ 2,278.71 825375 4120 USP TECHNOLOGIES 10/22/2026 $ 11,764.60
825376 0140 VALLEY PRESSURE PROS INC 10/22/2026 $ 25,420.00 825377 0110 VERITEXT 10/22/2026 $ 1,625.00
825378 0110 VERIZON WIRELESS 10/22/2026 $ 9,459.57
825379 1810 VOLTVERIFIED 10/22/2026 $ 1,590.00
825380 0110 WHITE CAP CONSTRUCTION SUPPLY 10/22/2026 $ 3,947.85 825381 1810 William H Vining 10/22/2026 $ 250.00
825382 5110 WILLIAMS CLEANING SYSTEMS INC 10/22/2026 $ 1,802.62 825383 4410 WITCHER ELECTRIC INC 10/22/2026 $ 18,598.94 825384 9110 WM-TMS CONSTRUCTION 10/22/2026 $ 2,047.28
825385 5110 XEROX BUSINESS SOLUTIONS 10/22/2026 $ 19.75 825386 0110 Zachary J Priest 10/22/2026 $ 278.00
825387 9110 ZTERS-PANAMA 10/22/2026 $ 2,044.47
825388 0110 US POSTAL SERVICE (QUADIENT-POC) 10/23/2026 $ 25,000.00 825389 0110 Amanda L Jackson 10/29/2026 $ 147.44
825391 0110 BAKERSFIELD CITY EMPLOYEE FEDERAL CREDI 10/29/2026 $ 2,852.50 825392 0140 BE FINALLY FREE INC 10/29/2026 $ 16,871.09
825393 4120 C W E A 10/29/2026 $ 259.00
825394 0110 CALIFORNIA DEPARTMENT OF TAX AND FEE AD 10/29/2026 $ 2,762.00 825397 5110 CALIFORNIA WATER SERVICE 10/29/2026 $ 174,405.54 825398 0110 CEN-CAL CONSTRUCTION INC 10/29/2026 $ 2,858,830.69 825399 0140 CHARTER UP LLC 10/29/2026 $ 1,789.16
825400 0110 CITY OF BAKERSFIELD 10/29/2026 $ 2,796.60
825402 0140 Derek M Sanchez 10/29/2026 $ 471.00
825403 0140 EAST HIGH DESIGN CLUB 10/29/2026 $ 7,565.90 825404 0110 INTERNATIONAL INSTITUTE OF MUNICIPAL CL 10/29/2026 $ 450.00 825406 3150 KERN COUNTY RECORDER 10/29/2026 $ 248.00
825407 4410 KERN COUNTY WATER AGENCY 10/29/2026 $ 53,691.76 825408 0110 MARDEROSIAN & COHEN 10/29/2026 $ 115,004.95 825410 4120 PACIFIC GAS & ELECTRIC CFM/PPC 10/29/2026 $ 49.81 825411 4310 PACIFIC GAS & ELECTRIC COMPANY 10/29/2026 $ 793,676.39 825412 6130 SEMITROPIC WATER STORAGE DISTRICT 10/29/2026 $ 21.00 825413 0140 Shayla N Woods-Collins 10/29/2026 $ 252.99
825414 0110 SOUTHERN CALIFORNIA EDISON CO. 10/29/2026 $ 662.16 825415 0110 Taylor E Johnson 10/29/2026 $ 471.00
825416 0110 Travis S Keller 10/29/2026 $ 471.00
825417 4120 U S BANK 10/29/2026 $ 1,595.00
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 8
Payment
Number Fund Vendor Name Check Date Check Amount
825419 0110 BACSCO 10/29/2026 $ 2,499.96
825421 0110 BAKER SUPPLIES AND REPAIRS 10/29/2026 $ 10,700.37 825423 0110 BUDGET BOLT INC 10/29/2026 $ 1,731.84
825426 0110 CONSOLIDATED ELECTRICAL DISTRIBUTORS IN 10/29/2026 $ 17,358.20 825428 5110 FAST UNDERCAR LLC 10/29/2026 $ 4,603.65
825432 3110 GRAINGER INC, W W 10/29/2026 $ 9,441.81
825434 3160 GRANITE CONSTRUCTION INC 10/29/2026 $ 377,090.04 825445 4120 HOME DEPOT 10/29/2026 $ 13,509.89
825448 5110 JIM BURKE FORD 10/29/2026 $ 8,063.19
825451 0110 KERN TURF SUPPLY 10/29/2026 $ 7,001.31
825454 4110 LOWES HOME IMPROVEMENT 10/29/2026 $ 3,207.61 825456 5110 O'REILLY AUTO PARTS 10/29/2026 $ 1,274.37
825458 5110 OFFICE1 10/29/2026 $ 1,125.85
825460 4510 STANDARD PLUMBING SUPPLY DBA FLOYDS 10/29/2026 $ 802.75 825462 0110 STINSON STATIONERS 10/29/2026 $ 2,902.50
825464 5110 TYACK TIRES INC 10/29/2026 $ 6,819.04
825467 0140 VESTIS SERVICES LLC 10/29/2026 $ 3,826.98
825468 5110 A T & T 10/29/2026 $ 8,891.64
825469 0110 A T & T 10/29/2026 $ 3,235.00
825470 0110 A T & T 10/29/2026 $ 806.08
825471 0140 A T & T MOBILITY 10/29/2026 $ 5,501.47
825472 0110 ACC BUSINESS 10/29/2026 $ 3,104.98
825473 5110 ADVANCED DISTRIBUTION CO 10/29/2026 $ 422.20 825474 4110 AECOM TECHNICAL SERVICES INC 10/29/2026 $ 53,541.25 825478 0110 ALEJANDRO ESPARZA MARQUEZ - RETIREE 10/29/2026 $ 42.50 825479 0140 ALL AMERICAN UNIFORMS LLC 10/29/2026 $ 3,434.28 825480 0110 ANDREW ESQUIVEL 10/29/2026 $ 175.00
825481 0110 ANITA J ROWE - REFUND 10/29/2026 $ 42.50
825482 1810 Anthony D Kidwell 10/29/2026 $ 471.00
825483 0110 ARGO CHEMICAL INC 10/29/2026 $ 6,332.23
825484 0110 ARLENE PAYAN - REFUND 10/29/2026 $ 42.50
825485 0110 AWP SAFETY 10/29/2026 $ 513.99
825486 5110 AXELLIANT LLC 10/29/2026 $ 18,090.48
825487 4310 B & B SURPLUS 10/29/2026 $ 1,510.09
825488 0140 BAKER TILLY ADVISORY GROUP LP 10/29/2026 $ 10,568.75 825489 3160 BAKERSFIELD CALIFORNIAN 10/29/2026 $ 2,712.44 825490 5110 BAKERSFIELD HARLEY DAVIDSON INC 10/29/2026 $ 100.32 825491 0110 BAKERSFIELD IRRIGATION 10/29/2026 $ 9,335.38 825492 1170 BAKERSFIELD SENIOR CENTER 10/29/2026 $ 1,011.15 825493 5110 BARBER AUTOMOTIVE GROUP 10/29/2026 $ 402.64 825494 0140 BARNES WELDING SUPPLY 10/29/2026 $ 1,211.61 825495 0110 BELINDA ROWLAND - REFUND 10/29/2026 $ 42.50 825496 5110 BERCHTOLD EQUIPMENT CO 10/29/2026 $ 1,558.01 825497 4210 BEST WEIGH SCALE CO INC 10/29/2026 $ 578.00 825498 0110 BILL OFFENBURGER - REFUND 10/29/2026 $ 42.50 825499 6110 BLACK INFANT MATERNAL HEALTH INITIATIVE 10/29/2026 $ 500.00 825500 5110 BLACKHOLE TECHNOLOGIES INC 10/29/2026 $ 415.49 825501 6110 BLUE SHIELD OF CALIFORNIA 10/29/2026 $ 648,720.22 825502 4410 BLUEPRINT SERVICE CO 10/29/2026 $ 528.10
825503 0110 BOBBIE LEDOUX - REFUND 10/29/2026 $ 10.50
825504 0110 BOLLES NURSERY LANDSCAPE 10/29/2026 $ 227.32 S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 9
Payment
Number Fund Vendor Name Check Date Check Amount
825505 3160 BOWMAN ASPHALT 10/29/2026 $ 73,100.00
825506 0110 BRADY INDUSTRIES 10/29/2026 $ 3,738.92
825508 5110 BROCKS TRAILER 10/29/2026 $ 597.30
825509 0110 BRUCE FRITZ - REFUND 10/29/2026 $ 42.50
825510 0110 Bryce D Patterson 10/29/2026 $ 222.00
825511 0120 BUREAU VERTIAS NORTH AMERICA INC 10/29/2026 $ 585.00 825512 3120 CAN/AM TECHNOLOGIES INC 10/29/2026 $ 93,847.32 825514 0110 CAROLYN HALL - REFUND 10/29/2026 $ 17.45
825515 0110 CECIL BOWEN - REFUND 10/29/2026 $ 42.50
825516 1510 CEN-CAL CONSTRUCTION INC 10/29/2026 $ 31,054.51 825517 1510 CENTENNIAL ASPHALT COMPANY 10/29/2026 $ 8,537.57 825518 0110 Chad W Garrett 10/29/2026 $ 344.00
825519 0110 CHAMPION HARDWARE 10/29/2026 $ 663.09
825520 5110 CHARTER COMMUNICATIONS 10/29/2026 $ 292.74
825521 0110 CHERYL CLAYBORN - REFUND 10/29/2026 $ 42.50 825523 0110 CHRISTOPHER ROBERTSON 10/29/2026 $ 350.00
825524 0110 Christopher S Bowles 10/29/2026 $ 213.00
825525 1910 CIMCO REFRIGERATION INC 10/29/2026 $ 910,356.69 825526 0110 CLARISSE JOHNSON - REFUND 10/29/2026 $ 25.86 825527 0110 CLEO BLACKBURN - REFUND 10/29/2026 $ 25.86
825528 5110 COASTLINE EQUIPMENT 10/29/2026 $ 1,529.85
825529 1120 COMMUNITY ACTION PARTNERSHIP OF KERN 10/29/2026 $ 23,478.20 825530 0110 CONNIE HUDDLESTON - RETIREE 10/29/2026 $ 42.50 825531 0110 COUNTY OF KERN INFORMATION TECHNOLOGY S 10/29/2026 $ 12,000.00 825533 5110 CUMMINS SALES AND SERVICE 10/29/2026 $ 127.31 825534 0110 CURTIS ELECTRICAL CONSTRUCTION 10/29/2026 $ 33,083.00 825535 0110 DAN KULLRICH - REFUND 10/29/2026 $ 42.50
825536 0140 DATA TICKET INC 10/29/2026 $ 39.00
825537 4120 DAVID JANES COMPANY 10/29/2026 $ 1,963.34
825538 0110 DAVID JUDSON - REFUND 10/29/2026 $ 42.50
825539 0110 DAVID OJEDA - REFUND 10/29/2026 $ 25.86
825540 0110 DEBORAH HUEY - REFUND 10/29/2026 $ 10.50
825541 4310 DELANEY MANUFACTURING INC 10/29/2026 $ 82,992.84 825542 4120 DELL MARKETING L P 10/29/2026 $ 4,018.30
825543 0110 Denise E Perez-Fernandez 10/29/2026 $ 503.00 825544 0110 DENNIS FIDLER - REFUND 10/29/2026 $ 12.21
825545 0110 DENNIS HALL - REFUND 10/29/2026 $ 25.86
825546 0110 DON ESTRADA - REFUND 10/29/2026 $ 25.86
825547 0110 DONALD TEUTIMEZ - REFUND 10/29/2026 $ 42.50 825548 0110 DREW SHARPLES - PART B 10/29/2026 $ 25.86
825549 0110 DUANE MORRIS LLP 10/29/2026 $ 16,111.42
825550 0110 DWAYNE LEVINGSTON - REFUND 10/29/2026 $ 42.50 825551 5110 EASYDRIFT TECHNOLOGY LLC 10/29/2026 $ 5,450.87 825552 4120 ELECTRIC MOTOR WORKS INC 10/29/2026 $ 15,578.44 825553 1910 EMBROIDERY PLUS LLC 10/29/2026 $ 358.31
825554 0110 EMILIO TARANGO - REFUND 10/29/2026 $ 25.86
825555 4120 Emily R Winther 10/29/2026 $ 259.00
825556 0110 EMMA ROBERTS - REFUND 10/29/2026 $ 42.50
825557 0110 ENVIROTEK CORPORATION 10/29/2026 $ 5,538.78 825558 0110 EWING IRRIGATION PRODUCTS 10/29/2026 $ 209.92 825559 0110 EZEQUIEL RENE VARGAS 10/29/2026 $ 250.00
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 10
Payment
Number Fund Vendor Name Check Date Check Amount
825561 0110 FERGUSON ENTERPRISES INC 10/29/2026 $ 2,463.47 825562 0110 FINQUERY LLC 10/29/2026 $ 13,410.00
825563 0140 FIRST AMERICAN TITLE COMPANY 10/29/2026 $ 682.00 825564 4110 FIRST CHOICE COFFEE SERVICES INC 10/29/2026 $ 651.73 825565 0140 FLOOD BAKERSFIELD MINISTRIES 10/29/2026 $ 33,211.26 825566 4210 FLS SUPPLY 10/29/2026 $ 81.19
825567 0110 FRANK LOPEZ - REFUND 10/29/2026 $ 25.86
825568 0110 FRANK R HERRERA - REFUND 10/29/2026 $ 25.86 825569 4510 GARDENERS SUPPLY INC 10/29/2026 $ 876.83
825570 3120 GCI EQUIPMENT RENTAL 10/29/2026 $ 2,478.92
825571 0110 GENERAL TREE SERVICE INC 10/29/2026 $ 6,067.00 825572 0110 GEORGE GILLBURG - REFUND 10/29/2026 $ 25.86 825573 5110 GOLDEN EMPIRE TOWING INC 10/29/2026 $ 50.00 825574 0110 GRACE MORIN - PART B 10/29/2026 $ 33.56
825575 0110 GREEN RUBBER - KENNEDY AG 10/29/2026 $ 754.61 825576 6110 GREGORY JACKSON III-REFUND 10/29/2026 $ 116.00 825577 5110 GREGS PETROLEUM SERVICES INC 10/29/2026 $ 6,230.20 825578 1860 GRIFFIN STRUCTURES INC 10/29/2026 $ 439,468.79 825579 0110 GRIFFITH COMPANY INC 10/29/2026 $ 745,912.29 825580 0110 GUADALUPE TINOCO - REFUND 10/29/2026 $ 25.86 825581 5110 H & S BODY WORKS & TOWING 10/29/2026 $ 50.00 825582 1170 HABITAT FOR HUMANITY GOLDEN EMPIRE 10/29/2026 $ 31,502.51 825583 0110 HALL LETTER SHOP 10/29/2026 $ 637.10
825585 6110 HEARTS CONNECTION-REFUND 10/29/2026 $ 500.00 825586 6110 HECTOR HERNANDEZ - REFUND 10/29/2026 $ 78.00 825587 0110 HENRY SHIPES - REFUND 10/29/2026 $ 25.86
825588 0110 HLP, INC 10/29/2026 $ 10.85
825589 6110 INNERLINE ENGINEERING-REFUND 10/29/2026 $ 400.00 825590 0110 ISAAC O MONSIBAIS - REFUND 10/29/2026 $ 25.86 825591 0110 ISABEL WILLIAMS - REFUND 10/29/2026 $ 25.86 825592 4310 J & E RESTAURANT SUPPLY INC 10/29/2026 $ 30.31 825593 0110 JAKE CADENA - REFUND 10/29/2026 $ 25.86
825594 0110 JAN-PRO CLEANING SYSTEMS 10/29/2026 $ 1,558.30 825595 0120 JAS PACIFIC INC 10/29/2026 $ 312.50
825596 0110 JERALD ASHLEY–REFUND 10/29/2026 $ 3.55
825597 5110 JERRY & KEITHS INC 10/29/2026 $ 1,282.43
825598 5110 JIMS TOWING INC 10/29/2026 $ 50.00
825599 0110 JOAN RICHARDSON–REFUND 10/29/2026 $ 17.45
825600 0110 JOE MONTELONGO 10/29/2026 $ 600.00
825601 0110 JOHN LEON - REFUND 10/29/2026 $ 42.50
825602 0110 JOHN P HOWLETT - REFUND 10/29/2026 $ 25.86
825603 0110 JOHNNY LOPEZ JR - REFUND 10/29/2026 $ 34.09 825604 0110 Jose G Gonzalez 10/29/2026 $ 78.59
825606 0110 JOSES ORNAMENTAL SUPPLY INC 10/29/2026 $ 135.31 825607 1810 Joshua J Patty 10/29/2026 $ 373.00
825608 0110 Joshua M Finney 10/29/2026 $ 1,405.00
825609 1810 Joshua Sanchez 10/29/2026 $ 471.00
825610 0110 JULENE EMBREY - REFUND 10/29/2026 $ 42.50
825611 1810 JULIE PARKER COMMUNICATIONS 10/29/2026 $ 2,500.00 825612 6110 K C S O S 10/29/2026 $ 1,572,905.53
825613 0110 KAISER PERMANENTE 10/29/2026 $ 33,415.67
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 11
Payment
Number Fund Vendor Name Check Date Check Amount
825614 0120 KAREN ALVAREZ - REFUND 10/29/2026 $ 195.00
825615 0110 KAREN CRAWFORD - REFUND 10/29/2026 $ 25.86
825616 0110 KAREN KISBEY - REFUND 10/29/2026 $ 12.21
825617 0110 Katie E Reed 10/29/2026 $ 100.85
825618 3160 KERN ASPHALT PAVING & SEALING 10/29/2026 $ 91,477.10 825619 6110 KERN COUNTY CLERKS 10/29/2026 $ 50.00
825620 6110 KERN COUNTY CLERKS 10/29/2026 $ 50.00
825621 6110 KERN COUNTY CLERKS 10/29/2026 $ 50.00
825622 6110 KERN COUNTY CLERKS 10/29/2026 $ 3,093.75
825623 6110 KERN COUNTY CLERKS 10/29/2026 $ 50.00
825624 6110 KERN COUNTY CLERKS 10/29/2026 $ 50.00
825625 6110 KERN COUNTY CLERKS 10/29/2026 $ 50.00
825626 6110 KERN COUNTY CLERKS 10/29/2026 $ 50.00
825627 4210 KERN COUNTY PUBLIC WORKS 10/29/2026 $ 295,320.18 825628 4210 KERN COUNTY WASTE MANAGEMENT 10/29/2026 $ 180,774.18 825629 1910 KERN ELECTRIC DISTRIBUTORS 10/29/2026 $ 3,727.16 825630 5110 KERN MACHINERY INC 10/29/2026 $ 2,335.09
825631 4210 KERN REFUSE DISPOSAL, INC 10/29/2026 $ 2,389,986.86 825632 0110 Kevin Albertson 10/29/2026 $ 322.00
825633 0110 KILLIAN PEST CONTROL 10/29/2026 $ 440.00
825634 0110 LARRY STURTEVANT - REFUND 10/29/2026 $ 12.21 825635 0110 LAUREN DIMBERG - REFUND 10/29/2026 $ 42.50
825636 0110 LAWMENS & SHOOTERS SUPPLY INC 10/29/2026 $ 1,830.72 825637 0110 LAWSON PRODUCTS INC 10/29/2026 $ 342.21
825638 0110 LEANDRO OLIVAREZ 10/29/2026 $ 200.00
825639 0110 LEROY ZINK - REFUND 10/29/2026 $ 42.50
825640 0110 LEVEL 3 COMMUNICATIONS LLC 10/29/2026 $ 3,836.88 825641 0110 LINDA ALONSO - REFUND 10/29/2026 $ 42.50
825642 1510 LINDE GAS & EQUIPMENT DBA PRAXAIR 10/29/2026 $ 231.62 825643 0110 Lisa L Moore 10/29/2026 $ 63.00
825644 5110 LONG BEACH BMW MOTORCYCLES 10/29/2026 $ 3,379.10 825645 4210 LOS DOS HERMANOS TRASH CREW LLC 10/29/2026 $ 2,540.00 825646 0110 LSL LLP 10/29/2026 $ 630.00
825648 0110 M ROSE OWEN - REFUND 10/29/2026 $ 42.50
825650 0110 MARGARET URSIN - REFUND 10/29/2026 $ 42.50
825651 4110 MARIA BECERRA - REFUND 10/29/2026 $ 717.13
825652 0110 MARIANNE LUDWICK-RICHARDSON–REFUND 10/29/2026 $ 6.29 825653 0110 MARK W AUSTIN - REFUND 10/29/2026 $ 42.50
825654 0110 MARY ANNE MCLAY - REFUND 10/29/2026 $ 25.86 825655 4510 MEAD & HUNT INC 10/29/2026 $ 21,091.64
825656 0110 MEDIWASTE DISPOSAL LLC 10/29/2026 $ 92.00
825658 3120 MEYER CIVIL ENGINEERING INC 10/29/2026 $ 2,497.00 825659 0110 MICHAEL F QUON - REFUND 10/29/2026 $ 42.50
825660 0110 MICKEY D MOYER - REFUND 10/29/2026 $ 42.50
825661 0110 MIKE DORKIN - REFUND 10/29/2026 $ 25.86
825662 0110 MIKE DOYLE - REFUND 10/29/2026 $ 42.50
825663 0140 MINUTEMAN PRESS 10/29/2026 $ 1,483.31
825664 0110 MITCHELL WILLOUGHBY - REFUND 10/29/2026 $ 42.50 825665 0140 MJS SOLUTIONS LLC 10/29/2026 $ 700.00
825666 3110 MOTION INDUSTRIES INC 10/29/2026 $ 155.39
825667 5110 MOTOR CITY SALES & SERVICE 10/29/2026 $ 102.38 S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 12
Payment
Number Fund Vendor Name Check Date Check Amount
825668 6110 NAMI KERN COUNTY CHAPTER 10/29/2026 $ 500.00 825669 0110 NANCY SIMS - REFUND 10/29/2026 $ 25.86
825670 0110 NEXT PLAY COLLECTIVE - REFUND 10/29/2026 $ 1,020.00 825671 4120 NICHOLAS CONSTRUCTION INC 10/29/2026 $ 4,206.68 825672 6110 NOEL ALEXANDRIA FOUNDATION - REFUND 10/29/2026 $ 500.00 825673 4310 NORTH KERN WATER STORAGE DISTRICT 10/29/2026 $ 1,428.56 825674 4120 NV5 INC 10/29/2026 $ 34,921.39
825675 0110 O'CONNOR PEST CONTROL 10/29/2026 $ 275.00
825676 0110 ORDIZ MELBY INC 10/29/2026 $ 7,500.00
825677 6310 P & A ADMINISTRATION SERVICES INC 10/29/2026 $ 13,852.63 825678 5110 PACIFIC POWER INC 10/29/2026 $ 343.92
825679 0120 PACIFICUS IV COMPANY - REFUND 10/29/2026 $ 1,475.32 825680 5110 PAPE KENWORTH 10/29/2026 $ 27.78
825681 5110 PAPE MATERIAL HANDLING 10/29/2026 $ 872.17
825682 0110 PATRICIA DARBEE - REFUND 10/29/2026 $ 25.86 825683 0110 Patrick P Harrelson 10/29/2026 $ 503.00
825684 0110 PAULA ROMINES - REFUND 10/29/2026 $ 25.86
825685 5110 PAYLESS TOWING 10/29/2026 $ 50.00
825686 5110 PB LOADER MANUFACTURING CO 10/29/2026 $ 1,251.81 825687 5110 PERFORMANCE TRUCK REPAIR 10/29/2026 $ 3,915.50 825688 3110 PIONEER PAINT 10/29/2026 $ 853.81
825689 5110 POWERSTRIDE BATTERY CO INC 10/29/2026 $ 252.88 825690 0110 PREMIER OVERHEAD DOOR & GATES 10/29/2026 $ 4,209.70 825691 0110 PRESTON GEORGE - REFUND 10/29/2026 $ 25.86
825692 4120 PRIMO BRANDS 10/29/2026 $ 2,393.20
825693 4410 PROVOST & PRITCHARD CONSULTING INC 10/29/2026 $ 3,585.20 825694 5110 QUESTIVITY 10/29/2026 $ 70,187.51
825695 5110 QUINN COMPANY INC 10/29/2026 $ 3,703.42
825696 4310 RANCHO TREE SERVICE 10/29/2026 $ 31,950.00
825697 5110 RAY GASKIN SERVICE INC 10/29/2026 $ 473.19
825698 5110 RCN TECHNOLOGIES 10/29/2026 $ 145.00
825699 0110 REFRIGERATION SUPPLIES DIST. INC 10/29/2026 $ 2,298.03 825700 6150 RGF LAND COMPANY, LLC - REFUND 10/29/2026 $ 125,532.00 825701 0110 RICHARD MCCORKLE - REFUND 10/29/2026 $ 42.50 825702 0110 RICHARD WATKINS - REFUND 10/29/2026 $ 25.86 825703 4210 RLH FIRE PROTECTION 10/29/2026 $ 892.00
825704 0110 ROBERT D MELTON - REFUND 10/29/2026 $ 12.21 825705 0110 ROBERT MEARS - REFUND 10/29/2026 $ 6.29
825706 0110 ROBERT TABLIT - REFUND 10/29/2026 $ 12.21
825707 0110 RODNEY KNIGHT - RETIREE 10/29/2026 $ 34.09
825708 0110 RONALD SHORT - REFUND 10/29/2026 $ 42.50
825709 0110 ROSA MARIA RUBIO - REFUND 10/29/2026 $ 20.93 825710 1810 Ruben Guerrero 10/29/2026 $ 213.00
825711 4310 SAN JOAQUIN FENCE & SUPPLY 10/29/2026 $ 19,361.75 825712 1810 Scott E Lasater 10/29/2026 $ 213.00
825713 3120 SCP DISTRIBUTORS LLC 10/29/2026 $ 2,527.23
825714 3120 SEQUOIA PAINT ENTERPRISE 10/29/2026 $ 289.79 825715 0110 SHIRLEY A PHILLIPS - REFUND 10/29/2026 $ 42.50 825716 0110 SHIRLEY TORRES - REFUND 10/29/2026 $ 25.86
825717 5110 SILVAS OIL CO INC 10/29/2026 $ 24,019.77
825719 5110 SMITH & SON TIRE INC 10/29/2026 $ 3,969.28
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\ 11/4/2026 ORACLE CHECK REGISTER
FROM 10/21/2026 TO 11/03/2026
PAGE 13
Payment
Number Fund Vendor Name Check Date Check Amount
825720 0110 STEVEN P KINNEY 10/29/2026 $ 2,299.00
825721 0110 Steven R Pace 10/29/2026 $ 540.92
825722 0110 SUSAN ALEXANDER - REFUND 10/29/2026 $ 25.86 825723 0110 SUSAN CARROLL - REFUND 10/29/2026 $ 25.86
825724 0110 T-MOBILE USA 10/29/2026 $ 395.00
825725 5110 TALLEY COMMUNICATIONS CO INC 10/29/2026 $ 766.80 825726 0110 TARGET SPECIALTY PRODUCTS 10/29/2026 $ 4,769.88 825727 0110 TATES JANITORIAL SERVICE 10/29/2026 $ 5,000.00 825728 5110 TEL TEC SECURITY SYSTEM INC 10/29/2026 $ 1,574.81 825729 0110 THE OPEN DOOR NETWORK 10/29/2026 $ 63,556.41 825730 0140 TREK DIGITAL PRODUCTS INC 10/29/2026 $ 6,970.83 825731 5110 TRINITY SAFETY COMPANY 10/29/2026 $ 30.00
825732 0110 TRUDY SLATER - REFUND 10/29/2026 $ 25.86
825733 0140 TRUSTEES OF THE UNIVERSITY OF PENNSYLVA 10/29/2026 $ 12,500.00 825734 5110 TULARE POLARIS 10/29/2026 $ 499.25
825735 0110 TURF TANK USA INC 10/29/2026 $ 2,772.95
825736 1810 Tyler J Schleicher 10/29/2026 $ 373.00
825737 3110 UNITED REFRIGERATION INC 10/29/2026 $ 1,363.88 825738 0110 UNITED RENTALS NORTH AMERICA INC 10/29/2026 $ 6,174.69 825739 4120 USABLUEBOOK 10/29/2026 $ 6,411.88
825740 4120 USP TECHNOLOGIES 10/29/2026 $ 52,528.65
825741 4120 VALLEY PRESSURE PROS INC 10/29/2026 $ 3,000.00 825742 1740 VERIZON WIRELESS 10/29/2026 $ 45.88
825743 1710 VERRA MOBILITY DBA AMERICAN TRAFFIC SO 10/29/2026 $ 56,802.40 825744 0110 VICTORIA DAVIS - REFUND 10/29/2026 $ 37.57
825745 0110 WESCO 10/29/2026 $ 34,273.13
825746 4410 WESTAIR GASES & EQUIPMENT INC 10/29/2026 $ 270.08 825747 5110 WESTCOAST HYDRAULICS 10/29/2026 $ 1,052.12
825748 0110 WHITE CAP CONSTRUCTION SUPPLY 10/29/2026 $ 731.86 825749 5110 WILCOX SUPPLY INC 10/29/2026 $ 432.39
825750 0140 WINSUPPLY BAKERSFIELD 10/29/2026 $ 11,000.00 9998633 0140 DP CAL CORPORATE PLAZA LP 10/22/2026 $ 65,666.16 9998635 0140 DP CAL CORPORATE PLAZA LP 10/29/2026 $ 4,389.58 $ 24,066,328.02
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - ADMIN\11.18.26\
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Department Payments and Agreements TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 5, 2026
SUBJECT: Receive and file department agreements over $40,000 and under $100,000 between October 21, 2026 and November 3, 2026.
RECOMMENDATION:
Staff recommends receiving and filing the report.
BACKGROUND:
In accordance with Bakersfield Municipal Code Chapter 3.20 the Finance Director must report other financial reports required to indicate the financial condition of the city periodically to the City Council. In conjunction with changes to Bakersfield Municipal Code Section 3.20, an informational report was requested to provide documentation of contracts between $40,000 and $100,000 to increase transparency and measure the effectiveness of the changes in contract authority threshold amounts.
FISCAL IMPACT:
$621,000.00
COUNCIL GOAL:
Innovative and Efficient City Government
ATTACHMENTS:
Department Agreement Report 11.18
Document
Number Name Subject Amount Date Miscellaneous Information PW22-157(4) Turner Trans Lift Crane services performing various tasks $40,000.00 10/21/2026 PW26-061 Alliance Technical Group
Landfill gas analysis & analytical results for the
sanitary landfill/lab analysis to be used on an as
needed basis
$40,000.00 10/30/2026
PW25-094(1) Provost & Pritchard Engineering
Group Inc
Amendment to scope of work for the Friant Kern
Canal Path Project $50,000.00 10/21/2026
PD25-032(1) Julie Parker Communications
Amendment to compensation and extend term to
continue communication training for law
enforcement
$95,000.00 10/21/2026
TS26-041 Clariti Cloud Inc Replace their expiring construction inspection appointment software $96,000.00 10/22/2026
PW26-060 Cimco Refrigeration Inc Dignity Health Arena Ice Plant Maintenance $100,000.00 10/21/2026 WR26-042 Granite Const Inc Supplying sand rock and gravel material $100,000.00 10/22/2026 CA26-013 Marderosian & Cohen General Miscellaneous Issues $100,000.00 10/30/2026 $621,000.00
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Christian Clegg, City Manager
DATE: November 6, 2026
SUBJECT: Resolution authorizing the City of Bakersfield to submit a grant application to the Office of Grants and Local Services to support Phase II of the MLK Park Reimagining and Revitalization Project. (Ward 2
RECOMMENDATION:
Staff recommends approval of the Resolution.
BACKGROUND:
The Office of Grants and Local Services has opened the second round for grant application submissions, due December 17th, to help fund outdoor recreation projects. The City of Bakersfield (“City”) is currently working towards acquiring funding to support the overall cost of the MLK Park Reimagining and Revitalization Project (MLK Park project) and the Statewide Parks and Community Revitalization Grant Program will provide significant support towards project funding efforts.
The Statewide Parks and Community Revitalization Grant Program provides funding up to 8.5 million dollars. While the grant does not require a match of funds, it does require the City have sufficient funds to complete the project. If awarded, the grant also requires a deed restriction on the MLK Park project property. The grant will be utilized to fund phase II of the MLK Park project, which includes sports courts, a new parking lot, and the demolition of the current community center.
FISCAL IMPACT:
The Statewide Parks and Community Revitalization Grant Program does not require a match of the funds for the project.
COUNCIL GOAL:
Innovative and Efficient City Government
ATTACHMENTS:
Resolution
Resolution Approving the Application for the Land and Water Conservation Fund Grant for MLK Park Reimaging and Revitalization Project
RESOLUTION NO. ____________
A RESOLUTION OF THE COUNCIL OF THE CITY OF
BAKERSFIELD APPROVING THE APPLICATION FOR
THE STATEWIDE PARK AND COMMUNITY
REVITALIZATION GRANT PROGRAM FOR PHASE II
OF THE MARTIN LUTHER KING PARK
REIMAGINING AND REVITALIZATION PROJECT.
WHEREAS, the State Department of Parks and Recreation has been delegated the responsibility by the Legislature of the State of California for the administration of the Statewide Park and Community Revitalization Grant Program, setting up necessary procedures governing the application; and
WHEREAS, procedures established by the State Department of Parks and Recreation require the Applicant to certify by resolution the approval of the application before submission of said application to the State; and WHEREAS, successful Applicants will enter into an agreement with the State of California to complete the Grant Scope project; and
WHEREAS, the application requires City of Bakersfield (“City”) to authorize the State to encumber Phase II of the Martin Luther King Park Reimaging and Revitalization Project, which is a portion of the real property located at 1000 S. Owens Street, Bakersfield, CA 93307 (“Project Property”), as more particularly described in the program requirements, by recording a Declaration of Restrictions, as required for the release of program grant funds to City, pursuant to the program requirements; and WHEREAS, the City certifies by resolution the approval of the submission of the application to the State.
NOW THEREFORE, be it resolved by the City Council of the City of Bakersfield as follows:
1. The above recitals are true and correct and incorporated herein by reference; and
2. Approves the filing of an application for the Statewide Park and Community Revitalization Grant Program assistance for the proposed: Phase III of the Martin Luther King Park Reimagining and Revitalization Project; and
3. Certifies that said Applicant has or will have available, prior to commencement of any work on the Project included in this application, the sufficient funds to complete the Project; and
4. Certifies that if the project is awarded, the Applicant has or will have sufficient funds to operate and maintain the Project, and Resolution Approving the Application for the Land and Water Conservation Fund Grant for MLK Park Reimaging and Revitalization Project
5. Certifies that the Applicant has reviewed, understands, and agrees to the General Provisions contained in the agreement shown in the Grant Administration Guide; and
6. Agrees to comply with all applicable federal, state and local laws, ordinances, rules, regulations and guidelines.
7. Certifies that the Mayor is authorized to execute the Declaration of Restrictions to be recorded against the Project Property in the official records where the Project Property is located prior to the State disbursing grant funds to City.
8. Delegates the authority to the City Manager or designee to conduct all negotiations, sign and submit all documents, including, but not limited to, applications, agreements, amendments, payment requests, and compliance with all applicable current state and federal laws which may be necessary for the completion of the aforementioned project.
---------------oooOooo--------------
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ___________________ by the following vote:
AYES: COUNCILMEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER
ABSTAIN: COUNCILMEMBER
ABSENT: COUNCILMEMBER
JULIE DRIMAKIS, CPMC, MMC
CITY CLERK and EX OFFICIO CLERK of the Council of the
City of Bakersfield
APPROVED: _________________
By
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By
Resolution Approving the Application for the Land and Water Conservation Fund Grant for MLK Park Reimaging and Revitalization Project
VIRIDIANA GALLARDO-KING
Deputy City Attorney II
VGK/vlg
S:\COUNCIL\Resos\26-27\MLK-Statewide Parks Grant App.Reso.docx
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 4, 2026
SUBJECT: Resolution setting rates and equipment specifications for tow truck services provided pursuant to contract with the City.
RECOMMENDATION:
Staff recommend adoption of the resolution.
BACKGROUND:
The City currently contracts with 10 local tow truck companies currently participating in a rotational call list to provide towing services as needed by the Police Department and City Fleet operations.
The City traditionally controls the rates that the participating tow companies can charge vehicle owners when the City initiates the request for service. Current rates were adopted by the City Council on November 2, 2022, via Resolution #175-2022.
Recently, participating tow companies have begun to request a review of the rate structure for adjustment. Consumer Price Index indicates that an increase of 15% would be appropriate. Further discussion with representatives from participating towing companies demonstrated that current rates do not meet operating costs incurred by participating towing companies, nor are they comparable to the rates paid by other local government entities. This has caused several towing companies involved to reject some calls, due to loss of revenue.
Representatives from the towing companies provided information on the cost of labor, fuel, and equipment incurred on an hourly and monthly basis, allowing staff to conclude that a 15% increase would be appropriate at this time.
FISCAL IMPACT:
Funds are budgeted in the 2026-27 Fiscal Year General Fund COUNCIL GOAL:
Economic Opportunity for All
ATTACHMENTS:
1. Resolution
2. Exhibits A & B
S:\Purchasing\PURCH\Olimpia - Main\Tow Admin, Reso and Exhibits\Reso for tow truck rate increase November 2026.doc -- Page 1 of 3 Pages --
RESOLUTION NO. ______________
A RESOLUTION OF THE BAKERSFIELD CITY
COUNCIL SETTING RATES AND EQUIPMENT
SPECIFICATIONS FOR TOW TRUCK SERVICES
PROVIDED PURSUANT TO CONTRACT WITH
THE CITY.
WHEREAS, it is necessary for the City of Bakersfield (herein “City”) to contract for heavy, medium, and light towing services for its own need and the need of its citizens; and
WHEREAS, City currently contracts with a number of tow truck companies to provide heavy, medium, and light towing services to meet its needs; and WHEREAS, the City adopted Resolution No. 175-2022 on November 2, 2022, which addressed tow truck services and rates; and
WHEREAS, it is City’s intent to regulate City and non-City tow services through this Resolution and future agreements; and
WHEREAS, it is City’s intent to allow departmental agreements for towing services, for City and non-City tows, in accordance with this Resolution; and WHEREAS, tow truck companies which execute said agreements shall be capable and willing to tow both City and non-City vehicles; and WHEREAS, it is City’s intent to allow only tow truck companies that have a primary location (as defined by contract), within City limits to enter into agreements for towing services with City; and
WHEREAS, it is City’s intent to limit the number of tow truck companies City contracts with for heavy, medium, and light towing services to ten (10) tow truck companies; and
WHEREAS, it is City’s intent that these ten (10) tow truck companies shall, at a minimum, be on the most current California Highway Patrol (“CHP”) Bakersfield Area Tow List (Northwest Tow District, Central Tow District, or Southwest Tow District) in good standing and meet tow truck classifications, equipment specifications, and auxiliary equipment specifications according to S:\Purchasing\PURCH\Olimpia - Main\Tow Admin, Reso and Exhibits\Reso for tow truck rate increase November 2026.doc -- Page 2 of 3 Pages --
the most current CHP Bakersfield Area Tow Services Agreement standards and certification requirements, as all are amended from time to time; and WHEREAS, the City received a request from the tow truck companies for consideration of a rate increase; and
WHEREAS, the City last approved a rate increase in November 2022; and WHEREAS, the City has conducted a technical analysis determining that a rate increase of approximately 15% would be appropriate based on relevant criteria and costs associated with tow truck operations which includes the increases in the Consumer Price Index for the Los Angeles-Long Beach-Anaheim, CA area.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
1. The foregoing recitals are true and correct and incorporated in their entirety herein by reference.
2. Resolution No. 175-2022 is hereby repealed in its entirety, and this Resolution supersedes all rates for fees and services previously adopted by Resolution No. 175-2022.
3. Rates to be charged for tow truck services pursuant to an agreement with City shall be at the rates set forth in Exhibits “A” and “B” attached hereto and incorporated by reference herein.
--oo0oo--
S:\Purchasing\PURCH\Olimpia - Main\Tow Admin, Reso and Exhibits\Reso for tow truck rate increase November 2026.doc -- Page 3 of 3 Pages --
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ___________, by the following vote:
AYES: COUNCILMEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER _________________________________________________________________ ABSTAIN : COUNCILMEMBER _________________________________________________________________ ABSENT: COUNCILMEMBER _________________________________________________________________ ____________________________________________
JULIE DRIMAKIS
City Clerk and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED _________________
By _________________________
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By _________________________
ASHLEY E. ZAMBRANO
Chief Assistant City Attorney
Attachments: Exhibits A and B
JHR/vlg
EXHIBIT A
LOCAL TOW RATE STRUCTURE
MAXIMUM RATES
Tow Truck Services. Rates to be charged for tow truck services by any business providing tow services to the City pursuant to contract between the City and the business shall be set forth as follows:
A. Light-Duty Tow Services. Use of a tow truck which has a manufacturer’s Gross Vehicle Weight Rating (“GVWR”) of at least 14,000 pounds and meets current CHP specifications for a Class A Tow Truck.
All light-duty towing
Per hour……………………………………………..$252.00
Inside Storage per day………………………………………..$50.00
Outside Storage per day……………………………………...$43.00
Service call charge…………………………………………...$70.00
After hours release…………………………………...………$84.00
B. Medium-Duty Tow Services. Use of a tow truck with a manufacturer’s GVWR of at least 26,001 pounds and meets current CHP specifications for a Class B Tow Truck.
. All medium-duty towing
Per hour……………………………………………..$300.00
Inside Storage per day………………………………………..$64.00
Outside Storage per day……………………………………...$50.00
Service call charge…………………………………………...$84.00
After hours release…………………………………...………$84.00
C. Heavy-Duty Tow Services. Use of a three-axle tow truck with a manufacturer’s GVWR of at least 48,000 pounds and meets current CHP specifications for a Class C Tow Truck.
All heavy-duty towing
Per hour……………………………………………..$490.00
Inside Storage per day………………………………………..$84.00
Outside Storage per day……………………………………...$70.00
Service call charge……………………………………….....$127.00
After hours release…………………………………...………$84.00
EXHIBIT B
LOCAL TOW RATE STRUCTURE FOR CITY VEHICLES
MAXIMUM RATES
Tow Truck Services For City Vehicles. Rates to be charged for tow truck services of City vehicles by any business providing tow services to the City pursuant to contract between the City and the business shall be set forth as follows.
All rates for the Greater Bakersfield area are defined by the following boundaries:
• 7th Standard Road to the north Taft Hwy. to the south • Heath Road to the west General Beale Road to the east The rates listed are per tow. There is no fuel surcharge. *Note: Outside the defined area, add $5 per mile from point of pick-up to boundary.
As detailed below, in all cases where additional fees are applied, the invoice must include justification and be approved upon review by the City’s Fleet Services Division.
A. Light-Duty Tow Services. Use of a tow truck which has a manufacturer's Gross Vehicle Weight Rating ("GVWR") of at least 14,000 pounds and meets current CHP specifications for a Class A tow truck.
All light-duty towing Per Tow .......................................................... $58.00 B. Medium-Duty Tow Services. Use of a tow truck with a manufacturer's GVWR of at least 26,001 pounds and meets current CHP specifications for a Class B tow truck.
All medium-duty towing Per Tow .................................................... $115.00 Dropping of driveline and supplying air to unit (as needed)..............$55.00 Installing driveline and disconnecting air to unit (as needed)............$55.00 C. Heavy-Duty Tow Services. Use of a three-axle tow truck with a manufacturer's GVWR of at least 48,000 pounds and meets current CHP specifications for a Class C tow truck.
All heavy-duty towing – Tow rate is Per Hour ............................ $201.00/hr Dropping of driveline and supplying air to unit (as needed).............$55.00 Installing driveline and disconnecting air to unit (as needed)...........$55.00 Vehicle involved in an accident (additional charge per hour) ……..$35.00/hr D. Low-Bed Trailer Services.
All low-bed trailer towing – Tow rate is Per Hour......................... $132.00/hr Winching on.......................................................................................$87.00 Winching off......................................................................................$87.00 E. Medium-Duty Trailer or Slide Bed.
All medium-duty trailer or slide bed towing Per Tow....................$140.00 Winching on......................................................................................$87.00 Winching off.....................................................................................$87.00
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 6, 2026
SUBJECT: Resolution determining that Adobe software products and subscriptions can most efficiently be obtained through cooperative procurement bidding procedures from Dell and authorizing the Finance Director to dispense with bidding for the purchase of Adobe software products and subscriptions in an amount not to exceed $200,000 for the Technology Services Department.
RECOMMENDATION:
Staff recommend adoption of the resolution and approval of the purchase.
BACKGROUND:
The Technology Services Department has standardized Adobe software and products for many years. Staff rely on Adobe software and subscriptions to produce documents in the normal course of business. Adobe software and subscriptions allow staff to modernize workflow, improve communication with the public, and to increase operational efficiency. Dell uses numerous cooperative procurement contracts to provide competitive pricing for this software.
The City municipal code section 3.20.060(D)(6) allows the City to dispense with bidding when it is determined that the equipment is not available from local vendors and that it is in the best interests of the City, and to the City’s economic advantage that such equipment be obtained at the lowest possible cost by entering into a cooperative procurement contract that was competitively bid within the last thirty-six months or is one that is still active and valid.
Dell has entered into a competitive procurement contract with Midwestern Higher Education Compact (MHEC) to offer discount pricing for adobe software products and subscriptions. Staff recommend adoption of the Resolution to dispense with bidding for the purchase of Adobe software products and subscriptions from Dell in an amount not to exceed $200,000 for the Technology Services Department.
FISCAL IMPACT:
Sufficient funds are budgeted in Fiscal Year 2026-27 Equipment Fund for this purchase, no additional funds are anticipated for this project.
COUNCIL GOAL:
Safety and Resilience
Innovative and Efficient City Government
ATTACHMENTS:
Resolution
Quote
RESOLUTION NO. _________________
A RESOLUTION OF THE BAKERSFIELD CITY
COUNCIL DISPENSING WITH FORMAL
BIDDING PROCEDURES IN THE PURCHASE OF
ADOBE SOFTWARE PRODUCTS AND
SUBSCRIPTIONS FROM DELL AND
AUTHORIZING THE USE OF COOPERATIVE
PROCUREMENT CONTRACTS FOR THE
PURCHASE OF ADOBE SOFTWARE PRODUCTS
AND SUBSCRIPTIONS IN ACCORDANCE WITH
SECTION 3.20.060(D)(6) OF THE BAKERSFIELD
MUNICIPA CODE.
WHEREAS, the City may enter into cooperative procurement contracts for work, supplies, equipment or materials without competitive bidding pursuant to Bakersfield Municipal Code Section 3.20.060(D)(6); and
WHEREAS, prices offered through national cooperative procurement contracts are generally less expensive than the prices for work, supplies, the City is currently paying; and
WHEREAS, purchasing work, supplies, equipment, or materials for the City through national cooperative procurement contracts is to the City’s economic advantage and in the City’s best interest; and
WHEREAS, Bakersfield Municipal Code Section 3.20.060(D)(6) allows the City to dispense with bidding procedures when it is determined that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active; and
WHEREAS, the process used to determine the vendors for the cooperative procurement contracts referenced herein substantially comply with the City’s procurement process, including public advertisement for sealed bids and awards determined on the basis of best value.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
1. The above recitals are true and correct and are incorporated herein by reference.
2. The Council finds that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active.
3. The Finance Director or his designee is authorized to dispense with bidding in accordance with section 3.20.060(D)(6) of the Bakersfield Municipal Code and to negotiate the purchase of same.
4. The Finance Director or his designee is authorized to purchase Adobe Software Products and Subscriptions from Dell through Midwestern Higher Education Compact pursuant to the terms and conditions of Contract No. MHEC-04152022 and may be amended from time to time and including any options to renew that may be exercised by Midwestern Highter Education Compact.
5. That the Finance Director or designee is authorized to negotiate and execute any documents that may be necessary to register with, and purchase work, supplies, equipment, or materials from, the vendors herein. --oo0oo--
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ____________________________, by the following vote:
YES: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCIL MEMBER ______________________________________________________________ ABSTAIN: COUNCIL MEMBER ______________________________________________________________ ABSENT: COUNCIL MEMBER _______________________________________________________________
________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED _________________
By _________________________
KAREN GOH Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By ______________________________
ASHLEY E. ZAMBRANO
Chief Assistant City Attorney
Your Quote is ready.
Your personalized Quote is now available for purchase.
Complete your order through our secure online checkout before your Quote expires.
Order Now
Quote No. 3000207970348.1
Total $69,325.94
Customer # 98597336
Quoted On Oct. 28, 2026
Expires by Nov. 03, 2026
Contract Name
Dell Midwestern Higher
Education Compact
(MHEC) Master Agreement
Contract Code C000000979569
Customer Agreement # MHEC-04152022
Sales Rep Lisa Velez
Phone 512-720-4826
Email [email protected]
Billing To FINANCE DEPT
CA-L CITY OF BAKERSFIELD
1600 TRUXTUN AVE
STE 401
BAKERSFIELD, CA 93301-5139
Message from your Sales Rep
Please use the Order button to securely place the order with your preferred payment method online. You may contact your Dell sales team if you have any questions. Thank you for shopping with Dell.
Regards, Lisa Velez
Shipping Group
Shipping To
ACCOUNTS PAYABLE
CA-L CITY OF BAKERSFIELD
FINANCE DEPT
1501 TRUXTON AVE
BAKERSFIELD, CA 93301-5201
(661) 326-3767
Shipping Method
Standard Delivery
Quantity Unit Price Subtotal
ADOBE VIP MARKETPLACE - 1005558445
1. VLA MP ACROBAT PRO FOR ENT MLP MNA LANG
SUBSCRIPTION NEW LGA
313 $96.25 $30,126.25
2. VLA MP PREMIERE PRO EDITION 4 FOR ENT MLP MNA
LANG SUBS NEW
5 $389.32 $1,946.60
3. VLA MP PHOTOSHOP EDITION 4 FOR ENT MLP MNA
LANG SUBS NEW
11 $389.32 $4,282.52
4. VLA MP CREATIVE CLOUD ALL APPS - EDITION 4 FOR
ENT MLP MNA LANG SUBS LGA
33 $936.99 $30,920.67
5. VLA MP ADOBE EXPRESS FOR ENT MLP MNA LANG
SUBS NEW
1 $103.30 $103.30
6. VLA MP ILLUSTRATOR EDITION 4 FOR ENT MLP MNA
LANG SUBS NEW
3 $389.32 $1,167.96
7. VLA MP INDESIGN EDITION 4 FOR ENT MLP MNA LANG
SUBS NEW
2 $389.32 $778.64
Subtotal:
Shipping:
Non-Taxable Amount:
Taxable Amount:
Estimated Tax:
Total:
$69,325.94
$0.00
$69,325.94
$0.00
$0.00
$69,325.94
Important Notes
Terms of Sale
This Quote will, if Customer issues a purchase order for the quoted items that is accepted by Supplier, constitute a contract between the entity issuing this Quote (“Supplier”) and the entity to whom this Quote was issued (“Customer”). Unless otherwise stated herein, pricing is valid for Thirty (30) days from the date of this Quote. All products, pricing, and other information are based on the latest information available and are subject to change for any reason. Taxes and/or freight charges listed on this Quote are only estimates. The final amounts shall be stated on the relevant invoice. Additional freight charges will be applied if Customer requests expedited shipping. Please indicate any tax exemption status on your purchase order and send your tax exemption certificate to [email protected] or [email protected], as applicable.
Prices and/or discounts, as applicable, are subject to change: (i) in the event of industry-wide shortages in materials or resources, increases in the cost of manufacturing, currency fluctuations, changes to government charges or tariffs, or other factors outside Supplier’s control; (ii) in the event of structural or significant changes in the way Supplier develops its pricing and/or discounting strategy; (iii) if Customer requests changes to Supplier’s planned delivery date; or (iv) if Customer materially breaches its commitments under this Quote. If such changes occur, pricing may be adjusted and/or purchase orders may be cancelled by Supplier until the date of shipment, even after an order has been placed. Supplier will give Customer as much notice of these changes as is reasonably practicable under the circumstances. Supplier also reserves the right to cancel this Quote and Customer purchase orders arising from pricing errors and/or Customer changes to Supplier’s planned delivery date.
Entire Agreement – This Quote, including the Governing Terms, Schedules, any Offering Specific Terms incorporated by reference and each Order, comprises the complete statement of the agreement of the Parties regarding the subject matter thereof, and may be amended only by written agreement. Terms on any Order or any term or condition on a Customer form have no legal effect and do not modify or supplement these Terms of Sale. Governing Terms: This Quote is subject to: (a) a separate written agreement between Customer or Customer’s affiliate and Supplier or a Supplier´s affiliate to the extent that it expressly applies to the products and/or services in this Quote or, to the extent there is no such agreement, to the applicable set of Dell’s Terms of Sale (available at www.dell.com/terms or www.dell.com/oemterms), or for cloud/as-a- Service offerings, the applicable cloud terms of service (identified on the Offer Specific Terms referenced below); and (b) the terms referenced herein (collectively, the “Governing Terms”). Different Governing Terms may apply to different products and services on this Quote. The Governing Terms apply to the exclusion of all terms and conditions incorporated in or referred to in any documentation submitted by Customer to Supplier.
Supplier Software Licenses and Services Descriptions: Customer’s use of any Supplier software is subject to the license terms accompanying the software, or in the absence of accompanying terms, the applicable terms posted on www.Dell.com/eula. Descriptions and terms for Supplier-branded standard services are stated at www.dell.com/servicecontracts/global or for certain infrastructure products at www.dellemc.com/en-us/customer-services/product-warranty-and-service-descriptions.htm. Offer-Specific, Third Party and Program Specific Terms: Customer’s use of third-party software is subject to the license terms that accompany the software. Certain Supplier-branded and third-party products and services listed on this Quote are subject to additional, specific terms stated on www.dell.com/offeringspecificterms (“Offer Specific Terms”).
In case of Resale only: Should Customer procure any products or services for resale, whether on standalone basis or as part of a solution, Customer shall include the applicable software license terms, services terms, and/or offer-specific terms in a written agreement with the end- user and provide written evidence of doing so upon receipt of request from Supplier.
In case of Financing only: If Customer intends to enter into a financing arrangement (“Financing Agreement”) for the products and/or services on this Quote with Dell Financial Services LLC or other funding source pre-approved by Supplier (“FS”), Customer may issue its purchase order to Supplier or to FS. If issued to FS, Supplier will fulfill and invoice FS upon confirmation that: (a) FS intends to enter into a Financing Agreement with Customer for this order; and (b) FS agrees to procure these items from Supplier. Notwithstanding the Financing Agreement, Customer’s use (and Customer’s resale of and the end-user’s use) of these items in the order is subject to the applicable governing agreement between Customer and Supplier, except that title shall transfer from Supplier to FS instead of to Customer. If FS notifies Supplier after shipment that Customer is no longer pursuing a Financing Agreement for these items, or if Customer fails to enter into such Financing Agreement within 120 days after shipment by Supplier, Customer shall promptly pay the Supplier invoice amounts directly to Supplier.
Customer represents that this transaction does not involve: (a) use of U.S. Government funds; (b) use by or resale to the U.S. Government; or (c) maintenance and support of the product(s) listed in this document within classified spaces. Customer further represents that this transaction does not require Supplier’s compliance with any statute, regulation or information technology standard applicable to a U.S. Government procurement.
For certain products shipped to end users in California, a State Environmental Fee will be applied to Customer’s invoice. Supplier encourages customers to dispose of electronic equipment properly.
Electronically linked terms and descriptions are available in hard copy upon request.
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 6, 2026
SUBJECT: Resolution determining that Dell Workstations and equipment can most efficiently be procured through cooperative procurement bidding procedures from Dell Marketing L.P. and authorizing the Finance Director to dispense with competitive bidding for the purchase of Dell workstations and equipment in the amount not to exceed $500,000 for the Technology Services Department.
RECOMMENDATION:
Staff recommend adoption of the resolution and approval of the purchase.
BACKGROUND:
The Technology Services Department (TSD) has standardized on Dell workstations and equipment for many years. This has allowed the City to maintain consistent hardware configurations, operating environments, and performance standards across Departments. The continued use of Dell workstations and equipment supports the City’s existing technology infrastructure, system compatibility, reliability, and ongoing Department needs.
Historically, the City has procured Dell workstations and equipment through its standard competitive bidding process, with Dell consistently submitting the lowest bid. However, this process has added time to the procurement process and delayed the delivery of equipment needed to support City departments.
Utilizing the cooperative procurement contract awarded to Dell Marketing L.P. will streamline the purchasing process, reduce procurement delays, and allow TSD to obtain the necessary equipment more efficiently to support ongoing operations and department needs.
The City municipal code section 3.20.060(D)(6) allows the City to dispense with bidding when it is determined that the equipment is not available from local vendors and that it is in the best interests of the City, and to the City’s economic advantage that such equipment be obtained at the lowest possible cost by entering into a cooperative procurement contract that was competitively bid within the last thirty-six months or is one that is still active and valid.
Dell, Marketing L.P. has an existing procurement contract with the National Association of State Procurement Officials (NASPO) to offer discounted pricing for its workstation products and equipment.
The Technology Services Department recommend utilizing the existing cooperative procurement contract to purchase Dell workstation and equipment from Dell Marketing L.P. in an amount not to exceed $500,000.
FISCAL IMPACT:
Sufficient funds are budgeted in the 2026-27 Fiscal Year Equipment Fund for this purchase.
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
1. Resolution
2. NASPO price schedule
RESOLUTION NO. _________________
A RESOLUTION OF THE BAKERSFIELD CITY
COUNCIL DISPENSING WITH FORMAL
BIDDING PROCEDURES IN THE PURCHASE OF
DELL WORKSTATIONS AND EQUIPMENT FROM
DELL MARKETING L.P. AND AUTHORIZING THE
USE OF COOPERATIVE PROCUREMENT
CONTRACTS FOR THE PURCHASE OF DELL
WORKSTATIONS AND EQUIPMENT IN
ACCORDANCE WITH SECTION 3.20.060(D)(6)
OF THE BAKERSFIELD MUNICIPA CODE.
WHEREAS, the City may enter into cooperative procurement contracts for work, supplies, equipment or materials without competitive bidding pursuant to Bakersfield Municipal Code Section 3.20.060(D)(6); and
WHEREAS, prices offered through national cooperative procurement contracts are generally less expensive than the prices for work, supplies, the City is currently paying; and
WHEREAS, purchasing work, supplies, equipment, or materials for the City through national cooperative procurement contracts is to the City’s economic advantage and in the City’s best interest; and
WHEREAS, Bakersfield Municipal Code Section 3.20.060(D)(6) allows the City to dispense with bidding procedures when it is determined that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active; and
WHEREAS, the process used to determine the vendors for the cooperative procurement contracts referenced herein substantially comply with the City’s procurement process, including public advertisement for sealed bids and awards determined on the basis of best value.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
1. The above recitals are true and correct and are incorporated herein by reference.
2. The Council finds that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active.
3. The Finance Director or his designee is authorized to dispense with bidding in accordance with section 3.20.060(D)(6) of the Bakersfield Municipal Code and to negotiate the purchase of same.
4. The Finance Director or his designee is authorized to purchase Dell workstations and equipment from Dell Marketing L.P. through National Association of State Procurement Officials (NASPO) pursuant to the terms and conditions of Contract No. 23004 and may be amended from time to time and including any options to renew that may be exercised by NASPO.
5. That the Finance Director or designee is authorized to negotiate and execute any documents that may be necessary to register with, and purchase work, supplies, equipment, or materials from, the vendors herein. --oo0oo--
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ____________________________, by the following vote:
YES: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCIL MEMBER ______________________________________________________________ ABSTAIN: COUNCIL MEMBER ______________________________________________________________ ABSENT: COUNCIL MEMBER _______________________________________________________________
________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED _________________
By _________________________
KAREN GOH Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By ______________________________
ASHLEY E. ZAMBRANO
Chief Assistant City Attorney
Exhibit D: Price Schedule
NASPO ValuePoint Computer Equipment (2023-2028)
CONTROL SET
Master Agreement: 23004
Contractor Name: Dell Marketing, LP
Awarded Bands:
x Band 1: Personal Computing Devices (Windows)
x Band 2: Personal Computing Devices (Non-Windows)
x Band 3: Servers and Storage
Band Category Code Category Description Discount off
Baseline List
1 1B Band 1 - Minimum Discount 18.0%
1 1T Band 1 - Third Party Product Minimum Discount 5.5% 2 2B Band 2 - Minimum Discount 18.0%
2 2T Band 2 - Third Party Product Minimum Discount 5.5% 3 3B Band 3 - Minimum Discount 18.0%
3 3T Band 3 - Third Party Product Minimum Discount 5.5% S-1 Standalone Services 4.0%
S-2 Warranty Services 4.0%
S-3 Training and Other Professional Services 4.0%
Exhibit D: Price Schedule Discount Structure
Master Agreement: 23004
Contractor Name: Dell Marketing, LP
Baseline Price List: Posted on Contractor's dedicated NASPO ValuePoint website Band 1: Personal Computer Equipment (Windows OS)
Band Category Code Category Description Discount off
Baseline List
1 1B Band 1 - Minimum Discount 18.0%
1 1B-1 Desktops - Alienware, Inspiron, Vostro, XPS 0.5% 1 1B-2 Notebooks - Alienware, Inspiron, Vostro, XPS 2.5% 1 1B-3 Projectors/Monitors/Other Electronics 2.5%
1 1B-4 Displays 2.5%
1 1B-5 Imaging 2.5%
1 1B-6 Dell Branded - Printer accessories, parts, and toner 1.5% 1 1B-7 Spare Parts related to Band 1 0.5%
1 1B-8 Customer Kits 15.0%
1 1B-9 Ready to Ship configurations 4.0%
1 1T Band 1 - Third Party Product Minimum Discount 5.5% 1 1T-1 Selected Third Party - Software and Peripherals 0.5% Band 2: Personal Computer Equipment (Non-Windows OS)
Band Category Code Category Description Discount off
Baseline List
2 2B Band 2 - Minimum Discount 18.0%
2 2B-1 Commercial Chromebooks 15.0%
2 2B-2 Consumer Chromebooks 15.0%
2 2B-3 Projectors/Monitors/Other Electronics 2.5%
2 2B-4 Displays 2.5%
2 2B-5 Imaging 2.5%
2 2B-6 Dell Branded - Printer accessories, parts, and toner 1.5% 2 2B-7 Spare Parts related to Band 2 0.5%
2 2B-8 Customer Kits 15.0%
2 2B-9 Ready to Ship configurations 4.0%
2 2T Band 2 - Third Party Product Minimum Discount 5.5% 2 2T-1 Selected Third Party - Software and Peripherals (Non-discountable) 0.5% Band 3: Servers and Storage
Band Category Code Category Description Discount off
Baseline List
3 3B Band 3 - Minimum Discount 18.0%
3 3B-1 Spare Parts related to Band 3 0.5%
3 3B-2 Customer Kits 15.0%
3 3T Band 3 - Third Party Product Minimum Discount 5.5% 3 3T-1 Selected Third Party - Software and Peripherals 0.5% Exhibit D: Price Schedule Volume-Based Discounts
Master Agreement: 23004
Contractor Name: Dell Marketing, LP
Bands 1 & 2
1. Per Transaction Multiple Unit Discount(s)
Min $ Single Transaction Max $ Single Transaction Per Transaction Multiple Unit Discount
$100,000.00 $199,999.99 1.0%
$200,000.00 $399,999.99 2.0%
$400,000.00 $599,999.99 4.0%
$600,000.00 $999,999.99 6.0%
$1,000,000.00 No Maximum 8.0%
2. Cumulative Discount(s)
Threshold Discount Level
Up to 2B 0.0%
$2B to $4B 1.0%
$4B to $6B 2.0%
$6B to $8B 3.0%
$8B to $10B 4.0%
Greater than $10B 5.0%
3. Other Discount(s)
Band 3
1. Per Transaction Multiple Unit Discount(s)
Min $ Single Transaction Max $ Single Transaction Per Transaction Multiple Unit Discount
$250,000.00 $499,999.99 1.0%
$500,000.00 $999,999.99 2.0%
$1,000,000.00 $1,499,999.99 4.0%
$1,500,000.00 $1,999,999.99 6.0%
$2,000,000.00 No Maximum 8.0%
none
Contractor provides a contractual volume discount program as follows based on dollars in a single purchase order or combination of purchase orders submitted at one time by a Purchasing Entity, or multiple entities conducting a cooperative purchase.
Contractor provides a cumulative volume discount as follows based on dollars resulting from the cumulative purchases by all purchases made by Purchasing Entities for the duration of the Master Agreement.
Note: Cumulative Discount does not apply to Category Exceptions, 3rd party products, services, and special promotional offers
Note: Per Transaction Multiple Unit Discount does not apply to Category Exceptions, 3rd party products, services, and special promotional offers
Note: Per Transaction Multiple Unit Discount does not apply to Category Exceptions, 3rd party products, services, and special promotional offers.
Contractor provides a contractual volume discount program as follows based on dollars in a single purchase order or combination of purchase orders submitted at one time by a Purchasing Entity, or multiple entities conducting a cooperative purchase.
Exhibit D: Price Schedule Volume-Based Discounts
2. Cumulative Discount(s)
Column1 Discount Level
Up to 2B 0.0%
$2B to $4B 1.0%
$4B to $6B 2.0%
$6B to $8B 3.0%
$8B to $10B 4.0%
Greater than $10B 5.0%
3. Other Discount(s)
Additional discount(s) available.
Contractor provides a cumulative volume discount as follows based on dollars resulting from the cumulative purchases by all purchases made by Purchasing Entities for the duration of the Master Agreement. none
Note: Cumulative Discount does not apply to Category Exceptions, 3rd party products, services, and special promotional offers.
Exhibit D: Price Schedule Services
Master Agreement: 23004
Contractor Name: Dell Marketing, LP
Travel for Services will be negotiated with each Participating Entity in the Participating Addendum.
All Awarded Bands
Category Code Description of Service Percent Discount
S-1 Standalone Services 4.0%
S-2 Warranty Services 4.0%
S-3 Training and Other Professional Services 4.0%
Each Purchasing Entity will determine if and how services will be offered in the Participating Exhibit D: Price Schedule Lease Rates
Master Agreement: 23004
Contractor Name: Dell Marketing, LP
All Awarded Bands
Optional: Lease Rates
Dell Financial Services (DFS’) payment solutions offer flexible end-of term options designed to suit each entity’s unique needs. Payment terms are generally from 24 through 60 months and are tailored to match the essential useful life of the equipment to the payment term. Payments can be billed monthly, quarterly, semi-annually or annually.
DFS payment solution rates are adjusted quarterly in accordance with a formula based on fluctuations in treasury notes. Our rates are a function of several factors including estimates of future residual values, prevailing interest rates, borrowing costs, general and administrative expenses, and solution structure. Once a payment schedule has commenced, the rate remains constant for the term of the schedule.
Exhibit D: Price Schedule Prompt Payment Discount
Master Agreement: 23004
Contractor Name: Dell Marketing, LP
in 30
in 15, Net 30
in 10, Net 30
X Net 30
All Awarded Bands
Other (specify):
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 10, 2026
SUBJECT: Dispense with bidding for security systems services and approve Agreement for a one-year term for the Technology Services Department.
1. Resolution determining that building security installation, maintenance, repair & monitoring services cannot be reasonably obtained through the usual bidding procedures and authorizing the Finance Director to dispense with bidding and negotiate the purchase of building security installation, maintenance. Repair & monitoring services not to exceed $250,000 for the Technology Services Department.
2. Approve contract to Tel-Tec Security Systems, Inc to provide security systems services a one-year term, not to exceed $250,000.
RECOMMENDATION:
Staff recommend adoption of Resolution and approval of the Agreement.
BACKGROUND:
Tel-Tec Security Systems, Inc. is a local security installation, maintenance, monitoring, and repair company that the City of Bakersfield uses for installation and monitoring of burglar alarms and electronic door and gate access control. The security systems and monitoring services provided by Tel-Tec assist in the City’s efforts to secure City facilities and buildings, prevent damage, theft, vandalism, unauthorized use by others, and provide City employees’ safety and security. Tel-Tec has provided these services to the City for over eight years and has developed extensive familiarity of the City’s existing security infrastructure and operational needs. Tel-Tec’s knowledge and familiarity of the City’s existing system will allow for the continued integration of security equipment, access controls, and monitoring services across City facilities and buildings, providing consistency in security system operations, maintenance, and troubleshooting.
City Municipal Code Section 3.20.060(D)(2) permits the City to dispense with competitive bidding when work, supplies, equipment, or materials can reasonably be obtained from only one vendor due to restricted availability of such work, supplies, equipment or material, or because of the necessity to successfully integrate such work, supplies, equipment or materials into an existing City project or system.
Staff recommend adoption of the resolution to dispense with bidding and approval of the Agreement in the amount of $250,000 for a one-year term for security systems services. Approval of both actions would allow the City to continue obtaining necessary security systems services from Tel-Tec Security Systems, Inc.
FISCAL IMPACT:
Sufficient funds are available in the 2026-27 Fiscal Year budget allocations.
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
1. Resolution
2. Agreement
-- Page 1 of 3 Pages --
RESOLUTION NO. ______________
A RESOLUTION OF THE BAKERSFIELD CITY
COUNCIL DISPENSING WITH FORMAL BIDDING
PROCEDURES IN THE PURCHASE OF SECURITY
SYSTEMS SERVICES FROM TEL-TEC SECURITY
SYSTEMS, INC. AND AUTHORIZING THE
PURCHASE OF THE SERVICES IN
ACCORDANCE WITH SECTION 3.20.060(D)(2)
OF THE BAKERSFIELD MUNICIPAL CODE.
WHEREAS, The City’s utilizes burglar alarm systems and electronic door and gate access control systems at City facilities and buildings to help protect City property, prevent damage, theft, vandalism, and unauthorized access, as well as provide city employees’ safety and security; and
WHEREAS, Installation, maintenance, monitoring, and repairservices for these security systems are necessary to support the continued security and operations of City facilities and buildings; and
WHEREAS, Tel-Tec Security Systems, Inc. is a local provider of security systems installation, maintenance, monitoring, and repair services; and WHEREAS, Tel-Tec has provided these services to the City for over eight years and has developed extensive familiarity with the City’s facilities, existing security infrastructure, and operational needs; and
WHEREAS, Tel-Tec’s knowledge of the City’s existing systems supports the continued integration of security equipment, access controls, and monitoring services across city facilities and buildings; and
WHEREAS, Continuing to use Tel-Tec will allow the City to maintain the existing security systems across City facilities and buildings, providing consistency in security system operations, maintenance, and troubleshooting; and WHEREAS, The Finance Director has determined that Tel-Tec’s security systems services are necessary to meet the City’s ongoing operational needs and maintain the integration of security equipment, access controls, and monitoring services into the City’s existing security system and has recommended that this Council authorize dispensing with formal bidding requirements in accordance with Section
3.20.060(D)(2) of the Bakersfield Municipal Code.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
-- Page 2 of 3 Pages --
1. The above recitals are true and correct and incorporated herein by this reference.
2. The Council hereby finds that the purchase of security systemsservices can only be reasonably obtained from one vendor, Tel-Tec Security Systems, Inc., because of the necessity to maintain the integration of such work, supplies, equipment or materials into the City’s existing project or system.
3. The Finance Director is authorized to dispense with bidding in accordance with Section 3.20.060(D)(2) of the Bakersfield Municipal Code, and to negotiate the purchase of security systems services. ---------------oooOooo--------------
-- Page 3 of 3 Pages --
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ______________________, by the following vote:
YES: COUNCILMEMBER: ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER: _______________________________________________________________ ABSTAIN: COUNCILMEMBER: ________________________________________________________________ ABSENT: COUNCILMEMBER: ________________________________________________________________
_______________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio of the
Council of the City of Bakersfield
APPROVED __________________
By: ___________________________
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By: ___________________________
ASHLEY E. ZAMBRANO
Chief Assistant City Attorney
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 6, 2026
SUBJECT: Resolution determining that EV Chevrolet Silverado crew cab pickup trucks can most efficiently be obtained through cooperative procurement bidding procedures from Winner Chevrolet/Elk Grove Auto and authorizing the Finance Director to dispense with bidding for the purchase of 16 units in the amount of $767,596.32 for the multiple Departments and Divisions
RECOMMENDATION:
Staff recommend adoption of the resolution and approval of the purchase BACKGROUND:
This purchase of sixteen (16) Electric Vehicle (EV) Chevrolet Silverado crew cab pickup trucks will replace units that are more than eleven years old and have become worn out and unreliable. The Fleet Division has determined that the units meet the criteria for replacement. The existing units will be replaced with new EV units providing more efficiency and improved performance. Additionally, the EV batteries are covered by an eight-year or 100,000-mile manufacture warranty, providing the City with added assurance regarding battery reliability and coverage during much of its anticipated vehicle replacement cycle.
The City municipal code section 3.20.060(D)(6) allows the City to dispense with bidding when it is determined that the equipment is not available from local vendors and that it is in the best interests of the City, and to the City’s economic advantage that such equipment be obtained at the lowest possible cost by entering into a cooperative procurement contract that was competitively bid within the last thirty-six months or is one that is still active and valid.
Winner Chevrolet/Elk Grove Auto has entered into a competitive procurement contract with State of California to offer discount pricing for their equipment. Staff recommend adoption of the Resolution to dispense with bidding for the purchase of sixteen (16) EV Chevrolet Silverado crew cab pickup trucks from Winner Chevrolet/Elk Grove Auto in the amount of $767,596.32 ($47,97477 per unit) for multiple Departments and Divisions.
FISCAL IMPACT:
Sufficient funds were previously budgeted in Fiscal Year 2026-27 Equipment Management Fund for this purchase. No Additional funds are needed for this project.
COUNCIL GOAL:
Innovative and Efficient City Government
ATTACHMENTS:
1. Resolution
2. Quote
- Page 1 of 3 Pages -
RESOLUTION NO. _________________
A RESOLUTION OF THE BAKERSFIELD CITY
COUNCIL DISPENSING WITH FORMAL
BIDDING PROCEDURES IN THE PURCHASE OF
ELECTRIC VEHCILE (EV) CHEVROLET
SILVERADO CREW CAB PICKUP TRUCKS
FROM WINNER CHEVROLET/ELK GROVE
AUTO AND AUTHORIZING THE USE OF
COOPERATIVE PROCUREMENT CONTRACTS
FOR THE PURCHASE OF 16 UNITS IN
ACCORDANCE WITH SECTION 3.20.060(D)(6)
OF THE BAKERSFIELD MUNICIPAL CODE.
WHEREAS, the City may enter into cooperative procurement contracts for work, supplies, equipment or materials without competitive bidding pursuant to Bakersfield Municipal Code Section 3.20.060(D)(6); and
WHEREAS, prices offered through national cooperative procurement contracts are generally less expensive than the prices for work, supplies, equipment or materials the City is currently paying; and WHEREAS, purchasing work, supplies, equipment, or materials for the City through national cooperative procurement contracts is to the City’s economic advantage and in the City’s best interests; and
WHEREAS, Bakersfield Municipal Code Section 3.20.060(D)(6) allows the City to dispense with bidding procedures when it is determined that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active; and
WHEREAS, the process used to determine the vendors for the cooperative procurement contracts herein substantially comply with the City’s procurement process, including public advertisement for sealed bids and awards determined on the basis of best value.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
- Page 2 of 3 Pages -
1. The above recitals are true and correct and are incorporated herein by reference.
2. The Council finds that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active.
3. The Finance Director or his designee is authorized to dispense with bidding in accordance with section 3.20.060(D)(6) of the Bakersfield Municipal Code and to negotiate the purchase of same.
4. The Finance Director or his designee is authorized to purchase 16 EV Chevrolet Silverado crew cab pickup trucks through the State of California pursuant to the terms and conditions of Contract No. 1-22-23-20D with Winner Chevrolet/Elk Grove Auto and may be amended from time to time and including any options to renew that may be exercised by the State of California.
5. That the Finance Director or designee is authorized to negotiate and execute any documents that may be necessary to register with, and purchase work, supplies, equipment, or materials from the vendors herein. --oo0oo--
- Page 3 of 3 Pages -
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ____________________________, by the following vote:
YES: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCIL MEMBER ______________________________________________________________ ABSTAIN: COUNCIL MEMBER ______________________________________________________________ ABSENT: COUNCIL MEMBER _______________________________________________________________
________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED _________________
By _________________________
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By ______________________________
ASHLEY E. ZAMBRANO
Chief Assistant City Attorney
Winner Chevrolet DATE November 3, 2026
Quotation # 10685-A
TO: CITY OF BAKERSFIELD FAN # 802786
(530) 981-5164 1600 Truxtun Ave
Bakersfield, CA 93301
Adan Cuevas Prepared by: Aidan Barnhart
661-362-3887
[email protected]
Comments or special instructions: Vehicle build and options are in additional pages.
AMOUNT
$ 49,997.00
$ 5,962.00
$ 438.00
$ 900.00
$ 57,297.00
DOC Fee $ 85.00
Taxable Subtotal: $ 57,382.00
8.250% $ 4,734.02
Tire Fee: $ 8.75
Fuel: $ -
$ 850.00
Total: $ 62,974.77
$ (15,000.00)
$ 47,974.77
QTY 1 $ 47,974.77
If you have any questions concerning this quotation, contact Aidan Barnhart at (530) 981-5164 or email at [email protected]
CA Clean Fuel Reward:
Grand Total:
Subtotal with CA Clean Fuel Reward:
**** Please review, sign, and return a copy of the quote and **** **** specs with the PO or the vehicle will not be ordered. **** ****Shipping charge added for deliveries beyond Sacramento. No charge for will call.**** Subtotal
___________________________________________________
(Order Acknowledgment Signature) (Date)
Tax Rate (subject to change):
CA Tire Fee: $1.75 / Per Tire
Delivery Charge:
$15,000.00 will be credited after tax on Invoice. Subject to approvall by CCFR. 7220 Fawn Way,
Sacramento, CA 95823
State Contract # 1-22-23-20D
CLIN 42A - Chevrolet Silveado EV
upgrade to 2LT Standard Range
Options (refer to window sticker):
2x additional key/fobs
Vehicle meets the CA Clean Fuel Reward Class 3 requirement. If funds are available at time of delivery THANK YOU FOR YOUR BUSINESS!!
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT *** Photo may not represent exact vehicle or selected equipment *** Prepared by
Aidan Barnhart
Winner Chevrolet / Elk Grove Auto
530-981-5164
[email protected]
[email protected]
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 2
Table of Contents
• Dealership Information
• Window Sticker
• Standard Equipment
• Technical Specifications
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 3
Dealership Information
***** IMPORTANT *****
Please review the Quote, "Window Sticker," and all included information and specifications for accuracy. If a purchase order is issued, please include a signed copy of this quote with the Window Sticker. By this quote being signed and returned by the purchasing agency, the purchasing agency acknowledges that the vehicle configuration and price are accurate.
The "Window Sticker" MSRP is for reference only and may not represent the final quoted price of the vehicle or optional equipment. Actual pricing may vary, see the Quote on page 1 for pricing.
Tax may not be included in the quote price. Purchasing agency is responsible for calculating tax. The tax rate is based on the registration address and cannot be a PO Box.
If the vehicle is going to be delivered beyond Sacramento, an additional delivery charge will be required.
Thanks!
Prepared By:
Aidan Barnhart
Winner Chevrolet / Elk Grove Auto
530-981-5164
[email protected]
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 4
Window Sticker
SUMMARY
[Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT Interior:Black, Evotex seat trim
Exterior 1:Summit White
Exterior 2:No color has been selected.
Engine, none
Transmission, none
OPTIONS
CODE MODEL MSRP
CT35843 [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT
OPTIONS
2LT LT Preferred Equipment Group $0.00
AR9 Seats, front bucket $0.00
CKU GVWR, 10,005 lbs. (4538 kg) $0.00
EN0 Engine, none $0.00
EWX Battery Pack, Standard Range $0.00
GAZ Summit White $0.00
HCN Black, Evotex seat trim $0.00
MF1 Transmission, none $0.00
PEB LPO, Level 2 and Fast Charging Adapter Package $398.00 PSC Dual Level Charge Cord, dual-mode $0.00
QWJ Tires, LT265/70R18, all-season blackwall $0.00
RIP Wheels, 18" X 8.5" (45.7 cm x 21.6 cm), high gloss Black painted aluminum
$0.00
RYK LPO, GM J1772 AC Adapter Inc.
RYW LPO, GM CCS1 DC Adapter Inc.
VK3 License plate bracket, front, front mounting package $40.00 VQ2 Fleet Processing Option $0.00
XRJ Dual Motor 4WD $0.00
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 5
YF5 Emissions, California state requirements $0.00
FUEL ECONOMY
Est City:N/A
Est Highway:N/A
Est Highway Cruising Range:N/A
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 6
Standard Equipment
Package
Assisted Driving Package includes (UGN) Enhanced Automatic Emergency Braking, (UVZ) Reverse Automatic Braking, (UFB) Rear Cross Traffic Braking, (CTB) Intersection Automatic Emergency Braking, (UKK) Rear Pedestrian Alert, (HS1) Safety Alert Seat, (UOW) Side Bicyclist Alert, (UVX) Traffic Sign Recognition, (UV2) HD Surround Vision and (KSG) Adaptive Cruise Control (Also includes (UD5) Front and Rear Parking Assist, (UKI) Blind Zone Steering Assist and (UKM) Lane Keep Assist with Lane Departure Warning.) Mechanical
Engine, none (STD)
Battery Pack, Standard Range (Up to 605 hp and 605 lb-ft of torque in Tow/Haul Mode.) (STD) Transmission, none (STD)
Dual Motor 4WD Performance Torque Vectoring Dual Motor 4WD (Electronic), 2 motors (1 front & 1 rear electric drive unit) (STD)
Dual Level Charge Cord, dual-mode portable, 120-volt (1.4 kW) and 240-volt (7.7 kW) capability, swappable NEMA 5-15 and NEMA 14-50 plugs with SAE J3400 (NACS) vehicle connection GVWR, 10,005 lbs. (4538 kg)
Pickup bed, 5 ft 11 inches
Electronic Precision Shift electronic transmission range selector with Low selection for throttle off regenerative braking and one-pedal driving capability
Emission system zero emission vehicle (ZEV)
Chassis, Dual Motor 4WD
Front Drive Unit 1-motor, Integrated Inverter, Park System Rear Drive Unit 1-motor, Integrated Inverter
DC fast charging (14MOD is 475V, up to 220kW)
Charging module, 11.5 kW high-voltage
Vehicle-to-home all V2H-capable GM EV's can provide power to your properly equipped home in a blackout to all equipment groups (The GM Energy PowerShift Charger and GM Energy V2H Enablement Kit requires an adequately charged and properly equipped GM EV having bidirectional charging capabilities, a properly equipped home, and proper grid interconnection. Weather conditions, life of the battery, vehicle variation and usage, and other external factors may impact the duration of power supply. Power supply may be interrupted. It is not recommended that the following devices be powered with the GM Energy PowerShift Charger and V2H Enablement Kit: Medical Devices.)
Suspension, 4-wheel independent suspension with premium ride and handling Brakes, front and rear sliding caliper disc with DURALIFE rotors, with Variable Regen on Demand capability Braking, regenerative, variable
Brake rotor, FNC
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 7
Mechanical
Trailer brake controller, integrated
Jack, mechanical, with tools located in the eTrunk
Exterior
Wheels, 18" X 8.5" (45.7 cm x 21.6 cm), high gloss Black painted aluminum (STD) Tires, LT265/70R18, all-season blackwall (STD)
Wheel, spare, 18" X 8.0" (45.7 cm x 20.3 cm), steel
Tire, spare LT225/65R18, all-season blackwall
Assist steps, Black, wheel to wheel
Power outlet, bed mounted, 120-volt and 400 watt inverter (Removed when (SW3) Plus Package or (SW4) Premium Package is ordered.)
Shutters, front upper and lower grille, active
IntelliBeam, automatic high beam on/off
Headlamps, LED, uplevel with LED Daytime Running Lamps
Tail lamps, LED with animation
LED Cargo Area Lighting located in cargo bed activated with switch on instrument panel Mirrors, outside heated power-adjustable, power-folding and driver-side auto-dimming, side perimeter lighting and memory
Mirror caps, painted Black
Window, front side, solar absorbing
Window, rear side, solar absorbing, privacy tinting
Glass, deep-tinted, rear door and rear cab
Wipers, front rain-sensing
Tailgate, standard
Tailgate, gate function manual with EZ Lift
Tailgate, locking
Door handles, body-color
Entertainment
SiriusXM with 360L Trial Subscription. SiriusXM with 360L transforms your customers' ride with our most extensive and personalized radio experience on the road. (IMPORTANT: The SiriusXM trial subscription is not provided on vehicles that are ordered for Fleet Daily Rental ("FDR") use. Trial subscription is subject to the SiriusXM Customer Agreement and privacy policy, visit siriusxm.com which includes full terms and how to cancel. All fees, content, features, and availability are subject to change.) Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 8
Entertainment
Audio System, 17.7" diagonal advanced color LCD display with Google built-in compatibility (select service plan required, terms and limitations apply), including navigation capability, connected apps, personalized profiles for each driver's settings, Natural Voice Recognition
Audio system feature, 6-speaker system
Wi-Fi Hotspot capable (Terms and limitations apply. See onstar.com or dealer for details.) 5G vehicle connectivity
Interior
Seats, front bucket (STD)
Evotex seat trim
Seat adjuster, front passenger 4-way manual
Seat adjuster, driver 2-way power lumbar
Seat adjuster, driver 8-way power
Seats, heated front driver and passenger cushion and back with dual mode switches Seat, rear 60/40 folding bench
Console, floor-mounted with lid 4 cup holders, front 2 are sliding, type-C USB ports, Auxiliary and 120V Power Outlets
Floor Covering, Black Carpeting
Floor mats, front, carpeted
Floor mats, rear, carpeted
Steering Wheel, 3-spoke, Sport
Steering wheel, heated
Steering column, manual tilt and telescoping
Steering wheel audio controls
Driver Information Center 11" diagonal display with fully digital color Windows, driver express up/down and front passenger and rear windows express down only Door locks, power
Power Hood, Hands free, eTrunk release with power up and power down Remote vehicle starter system pre-conditioning
Keyless Open and Power On includes 2 remote transmitters that enable automatic door unlock and open by touching door switch
Universal Home Remote, Virtual, accessible through infotainment Adaptive Cruise Control (Included with (AS2) Assisted Driving Package.) Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 9
Interior
Theft-deterrent system, unauthorized entry
Alarm, remote panic
Wireless Phone Charging
USB Ports, 2, Type-C Charge/Data ports located on floor console USB port, type-C, located within the center console armrest bin USB Ports, rear, dual, Type-C charge-only
Power outlet, front console, 12-volt
Power outlet, 120-volt, on back of floor console
Power outlet, 120-volt, located in the eTrunk
Air conditioning, dual-zone automatic climate control
Air vents, rear, heating/cooling
Air filter, pollutant
Defogger, rear-window electric
Sensor, cabin humidity and windshield temperature
Map pocket, front passenger seatback
Mirror, inside rearview auto-dimming
Ambient lighting
eTrunk, lockable weather-proof and lit compartment with 120 volt outlet, cargo tie-downs and drain holes Safety-Mechanical
Enhanced Automatic Emergency Braking (Included with (AS2) Assisted Driving Package.) Reverse Automatic Braking (Included with (AS2) Assisted Driving Package.) Rear Cross Traffic Braking (Included with (AS2) Assisted Driving Package.) Front Pedestrian and Bicyclist Braking
Intersection Automatic Emergency Braking intersection alert, braking (Included with (AS2) Assisted Driving Package.)
StabiliTrak, Stability Control System with Proactive Roll Avoidance and traction control includes electronic trailer sway control and hill start assist
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 10
Safety-Interior
Airbags, Frontal airbags for driver and front passenger; Seat-mounted side-impact airbags for driver and front outboard passenger; Head-curtain airbags for front and rear outboard seating positions; Includes front outboard Passenger Sensing System for frontal passenger airbag (Always use seat belts and child restraints. Children are safer when properly secured in a rear seat in the appropriate child restraint. See the Owner's Manual for more information.)
OnStar Services capable (See onstar.com for details and limitations. Services vary by model. Service plan required.)
Interior Camera enables Cabin Glance and Security Recording Virtualized Ride Mode Interface
Side Bicyclist Alert (Included with (AS2) Assisted Driving Package.) LED Reflective Windshield Collision Alert
Traffic Sign Recognition (Included with (AS2) Assisted Driving Package.) HD Surround Vision with Trailer View Camera Provision (Included with (AS2) Assisted Driving Package.) Blind Zone Steering Assist (Included with (AS2) Assisted Driving Package. Replaced with (UKW) Blind Zone Steering Assist with Trailering when (ZL6) Trailer Integration Package is ordered.) Lane Keep Assist with Lane Departure Warning, enhanced (Included with (AS2) Assisted Driving Package.) Front and Rear Parking Assist
Hitch View
Hitch Guidance
Following Distance Indicator
Forward Collision alert
Rear Pedestrian Alert (Included with (AS2) Assisted Driving Package.) Rear Seat Reminder
Seat Belt adjustable Guide Loops, front row
Seat Belt, front passenger presence detector
Seat belt, rear passenger presence detector
Buckle to Drive prevents vehicle from being shifted out of Park until driver seat belt is fastened; times out after 20 seconds and encourages seat belt use, can be turned on and off in Settings or Teen Driver menu LATCH system (Lower Anchors and Tethers for CHildren) for child restraints seats Safety Alert Seat (Included with (AS2) Assisted Driving Package.) Door locks, rear child security lock manual child lock system (rear door latch) Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 11
Safety-Interior
Teen Driver configurable feature that lets you activate customizable vehicle settings associated with a key fob, to help encourage safe driving behavior. It can limit certain available vehicle features, and it prevents certain safety systems from being turned off. An in-vehicle report card gives you information on driving habits and helps you to continue to coach your new driver
Tire Pressure Monitoring System auto learn, includes Tire Fill Alert OnStar Basics (OnStar Fleet Basics for Fleet) Drive with confidence and convenience using core OnStar services, featuring built-in voice assistance, realtime navigation, and access to audio streaming apps. With your vehicle mobile app, you can seamlessly manage your vehicle by sending commands and enjoy peace of mind knowing Automatic Crash Response can connect you to help if you're in need. (Requires (UE1) OnStar. OnStar Basics is standard for 8 years; working electrical system, cell reception and GPS signal required. OnStar links to emergency services. Service coverage varies with conditions and location. Service availability, features and functionality vary by model year, vehicle, device and software version. Includes available audio apps only. Third-party services may require separate subscription. Subject to user terms. See onstar.com for details and limitations. Removed with a ship-to of Guam, Puerto Rico or the Virgin Islands.) Processing-Other
Trailering Information Label
WARRANTY
Warranty Note: <<< Preliminary 2027 Warranty >>>
Basic Years: 3
Basic Miles/km: 36,000
Corrosion Years (Rust-Through): 6
Corrosion Years: 3
Corrosion Miles/km (Rust-Through): 100,000
Corrosion Miles/km: 36,000
Hybrid/Electric Components Years: 8
Hybrid/Electric Components Miles/km: 100,000
Roadside Assistance Years: 5
Roadside Assistance Miles/km: 60,000
Roadside Assistance Note: Towing: 8 Years/100,000 Miles Maintenance Note: First Visit: 12 Months/12,000 Miles
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 12
Technical Specifications
Powertrain
Transmission
Drivetrain Four Wheel Drive Trans Order Code MF1
Trans Type 1 Trans Description Cont. N/A
Trans Description Cont. Again N/A First Gear Ratio (:1) N/A Reverse Ratio (:1) N/A Clutch Size N/A
Trans Power Take Off N/A Final Drive Axle Ratio (:1) N/A Transfer Case Model N/A Transfer Case Gear Ratio (:1), High N/A Transfer Case Gear Ratio (:1), Low N/A Transfer Case Power Take Off N/A Mileage
EPA Fuel Economy Est - Hwy N/A Cruising Range - City N/A EPA Fuel Economy Est - City N/A Fuel Economy Est-Combined N/A Cruising Range - Hwy N/A Estimated Battery Range 286 mi Engine
Engine Order Code EN0 Engine Type Electric
Displacement N/A Fuel System Electric
SAE Net Horsepower @ RPM N/A SAE Net Torque @ RPM N/A
Engine Oil Cooler N/A
Electrical
Cold Cranking Amps @ 0° F (Primary) N/A Cold Cranking Amps @ 0° F (2nd) N/A Cold Cranking Amps @ 0° F (3rd) N/A Maximum Alternator Capacity (amps) N/A Cooling System
Total Cooling System Capacity N/A
Traction Battery
Usable/net Traction Battery Capacity
(kWh)
N/A Gross Traction Battery Capacity (kWh) N/A
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 13
Vehicle
Emissions
Tons/yr of CO2 Emissions @ 15K mi/year N/A EPA Greenhouse Gas Score N/A Chassis
Weight Information
Standard Weight - Front 0.00 lbs Standard Weight - Rear 0.00 lbs Base Curb Weight N/A Gross Axle Wt Rating - Front N/A
Gross Axle Wt Rating - Rear N/A Curb Weight - Front N/A Curb Weight - Rear N/A Option Weight - Front 0.00 lbs
Option Weight - Rear 0.00 lbs Reserve Axle Capacity - Front N/A Reserve Axle Capacity - Rear N/A As Spec'd Curb Weight N/A As Spec'd Payload N/A Maximum Payload Capacity N/A
Gross Combined Wt Rating 16600 lbs Gross Axle Weight Rating N/A Curb Weight N/A Reserve Axle Capacity N/A
Total Option Weight 0.00 lbs Payload Weight Front 0 lbs Payload Weight Rear 0 lbs Gross Vehicle Weight Rating 10005.00 lbs Trailering
Dead Weight Hitch - Max Trailer Wt. 5000 lbs Dead Weight Hitch - Max Tongue Wt. 500 lbs Wt Distributing Hitch - Max Trailer Wt. 8500 lbs Wt Distributing Hitch - Max Tongue Wt. 850 lbs Fifth Wheel Hitch - Max Trailer Wt. N/A Fifth Wheel Hitch - Max Tongue Wt. N/A Maximum Trailering Capacity 8500 lbs
Frame
Frame Type N/A Sect Modulus Rails Only N/A
Frame RBM N/A Frame Strength N/A
Frame Thickness N/A
Suspension
Suspension Type - Front Independent Suspension Type - Rear Independent Spring Capacity - Front N/A Spring Capacity - Rear N/A
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 14
Chassis
Suspension
Axle Type - Front N/A Axle Type - Rear N/A
Axle Capacity - Front N/A Axle Capacity - Rear N/A
Axle Ratio (:1) - Front N/A Axle Ratio (:1) - Rear N/A
Shock Absorber Diameter - Front N/A Shock Absorber Diameter - Rear N/A Stabilizer Bar Diameter - Front N/A Stabilizer Bar Diameter - Rear N/A Tires
Front Tire Order Code QWJ Rear Tire Order Code QWJ
Spare Tire Order Code ZBD Front Tire Size LT265/70R18
Rear Tire Size LT265/70R18 Spare Tire Size LT225/65R18
Front Tire Capacity N/A Rear Tire Capacity N/A
Spare Tire Capacity N/A Revolutions/Mile @ 45 mph - Front N/A Revolutions/Mile @ 45 mph - Rear N/A Revolutions/Mile @ 45 mph - Spare N/A Wheels
Front Wheel Size 18 x 8.5 in Rear Wheel Size 18 x 8.5 in Spare Wheel Size 18 x 8 in Front Wheel Material Aluminum Rear Wheel Material Aluminum Spare Wheel Material Steel Steering
Steering Type N/A Steering Ratio (:1), Overall N/A
Steering Ratio (:1), On Center N/A Steering Ratio (:1), At Lock N/A Turning Diameter - Curb to Curb 44.0 ft Turning Diameter - Wall to Wall N/A Brakes
Brake Type Pwr Brake ABS System N/A
Brake ABS System (Second Line) N/A Disc - Front (Yes or ) Yes Disc - Rear (Yes or ) Yes Front Brake Rotor Diam x Thickness N/A Rear Brake Rotor Diam x Thickness N/A Drum - Rear (Yes or ) N/A Rear Drum Diam x Width N/A
Winner Chevrolet / Elk Grove Auto
Aidan Barnhart | 530-981-5164 | [email protected] Vehicle: [Fleet] 2027 Chevrolet Silverado EV (CT35843) e4WD Crew Cab Standard Range LT ( Complete )
This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.
Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.
Data Version: 30116. Data Updated: Nov 2, 2026 6:58:00 PM UTC.
Nov 4, 2026 Page 15
Chassis
Fuel Tank
Fuel Tank Capacity, Approx N/A Aux Fuel Tank Capacity, Approx N/A Fuel Tank Location N/A Aux Fuel Tank Location N/A
Dimensions
Interior Dimensions
Passenger Capacity 5 Front Head Room 41.87 in
Front Leg Room 44.85 in Front Shoulder Room 64.92 in
Front Hip Room 61.95 in Second Head Room 39.71 in
Second Leg Room 44.35 in Second Shoulder Room 63.8 in
Second Hip Room 61.43 in
Exterior Dimensions
Wheelbase 145.68 in Length, Overall w/o rear bumper N/A Length, Overall w/rear bumper N/A Length, Overall 233.07 in Width, Max w/o mirrors 85.27 in Height, Overall 78.15 in Overhang, Front 36.2 in Overhang, Rear w/o bumper 51.23 in Front Bumper to Back of Cab N/A Cab to Axle N/A
Cab to End of Frame N/A Ground to Top of Load Floor N/A Ground to Top of Frame N/A Frame Width, Rear N/A
Ground Clearance, Front 8.23 in Ground Clearance, Rear 8.23 in Body Length 0.00 ft Cab to Body N/A
Cargo Area Dimensions
Cargo Box Length @ Floor N/A Cargo Box Width @ Top, Rear N/A Cargo Box Width @ Floor N/A Cargo Box Width @ Wheelhousings N/A Cargo Box (Area) Height N/A Tailgate Width N/A
Cargo Volume 10.8 ft³ Ext'd Cab Cargo Volume N/A
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 6, 2026
SUBJECT: Resolution determining that an EV Wheel Loader can most efficiently be obtained through cooperative procurement bidding procedures from Volvo Construction Equipment & Services and authorizing the Finance Director to dispense with bidding for the purchase of one unit in the amount of $436,086.11 for the Solid Waste Division withing the Public Works Department.
RECOMMENDATION:
Staff recommend adoption of the resolution and approval of the purchase.
BACKGROUND:
The purchase of one Electronic Vehicle (EV) wheel loader for the Solid Waste Division within the Public Works Department will replace a unit that is worn out, unreliable, and meets the criteria for replacement as determined by the Fleet Division within the Public Works Department. The unit will be replaced with a new EV unit providing more efficiency and improved performance. Additionally, the EV battery is covered by a 5-year manufacture warranty, providing the City with added assurance regarding battery reliability and coverage during much of its anticipated replacement cycle. This coverage extends beyond the standard one-year warranty typically provided on conventional diesel-powered wheel loaders.
The City municipal code section 3.20.060(D)(6) allows the City to dispense with bidding when it is determined that the equipment is not available from local vendors and that it is in the best interests of the City, and to the City’s economic advantage that such equipment be obtained at the lowest possible cost by entering into a cooperative procurement contract that was competitively bid within the last thirty-six months or is one that is still active and valid.
Volvo Construction Equipment & Services has entered into a competitive procurement contract with Soucewell to offer discount pricing for their equipment. Staff recommend adoption of the Resolution to dispense with bidding for the purchase of one EV wheel loader, in the amount of $436,086.11 for the Solid Waste Division within the Public Works Department.
FISCAL IMPACT:
Sufficient funds have been budgeted in the 2026-27 Fiscal Year Equipment Management Fund for this purchase.
COUNCIL GOAL:
Innovative and Efficient City Government
ATTACHMENTS:
1. Resolution
2. Quote
- Page 1 of 3 Pages -
RESOLUTION NO. _________________
A RESOLUTION OF THE BAKERSFIELD CITY
COUNCIL DISPENSING WITH FORMAL
BIDDING PROCEDURES IN THE PURCHASE OF
AN ELECTRIC VEHICLE (EV) WHEEL LOADER
FROM VOLVO CONSTRUCTION EQUIPMENT &
SERVICES AND AUTHORIZING THE USE OF
COOPERATIVE PROCUREMENT CONTRACTS
FOR THE PURCHASE OF ONE UNIT IN
ACCORDANCE WITH SECTION 3.20.060(D)(6)
OF THE BAKERSFIELD MUNICIPAL CODE.
WHEREAS, the City may enter into cooperative procurement contracts for work, supplies, equipment or materials without competitive bidding pursuant to Bakersfield Municipal Code Section 3.20.060(D)(6); and
WHEREAS, prices offered through national cooperative procurement contracts are generally less expensive than the prices for work, supplies, equipment or materials the City is currently paying; and WHEREAS, purchasing work, supplies, equipment, or materials for the City through national cooperative procurement contracts is to the City’s economic advantage and in the City’s best interests; and
WHEREAS, Bakersfield Municipal Code Section 3.20.060(D)(6) allows the City to dispense with bidding procedures when it is determined that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active; and
WHEREAS, the process used to determine the vendors for the cooperative procurement contracts herein substantially comply with the City’s procurement process, including public advertisement for sealed bids and awards determined on the basis of best value.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
- Page 2 of 3 Pages -
1. The above recitals are true and correct and are incorporated herein by reference.
2. The Council finds that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active.
3. The Finance Director or his designee is authorized to dispense with bidding in accordance with section 3.20.060(D)(6) of the Bakersfield Municipal Code and to negotiate the purchase of same.
4. The Finance Director or his designee is authorized to purchase one electric vehicle (EV) wheel loader through Sourcewell pursuant to the terms and conditions of Contract No. 011723-VCE with Volvo Construction Equipment & Services and may be amended from time to time and including any options to renew that may be exercised by Sourcewell.
5. That the Finance Director or designee is authorized to negotiate and execute any documents that may be necessary to register with, and purchase work, supplies, equipment, or materials from the vendors herein. --oo0oo--
- Page 3 of 3 Pages -
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ____________________________, by the following vote:
YES: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCIL MEMBER ______________________________________________________________ ABSTAIN: COUNCIL MEMBER ______________________________________________________________ ABSENT: COUNCIL MEMBER _______________________________________________________________
________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED _________________
By _________________________
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By ______________________________
ASHLEY E. ZAMBRANO
Chief Assistant City Attorney
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 6, 2026
SUBJECT: Dispense with bidding for the purchase of a Gas Ford F550 Regular Cab Chassis with outfitting for the Fire Department.
1. Resolution determining that a gas Ford F550 Regular Cab Chassis with CTEC outfitting can most efficiently be obtained through cooperative procurement bidding procedures from Downtown Ford Sacramento and authorizing the Finance Director to dispense with bidding for the purchase of one unit in the amount of $157,734.25 for the Fire Department.
2. Appropriate $45,945 Federal Grant Funds from the USDA Forest Services and the USDI Bureau of Land Management Fund balance to the Fire Department Operating budget.
3. Appropriate $45,944 State Grant Funds from the California Office of Emergency Services Fund balance to the Fire Department Operating budget.
RECOMMENDATION:
Staff recommend adoption of the resolution and approval of appropriation to complete the purchase BACKGROUND:
The purchase of one 2027 Ford F550 Regular Cab Chassis outfitted with a California Truck Equipment Company (CTEC) Fire Patrol Unit, a highly maneuverable custom-engineered vehicle build, with a type 6 engine designed will enhance the City’s Fire Department’s capability to respond to grass fires and wildland – urban interface (WUI) incidents. The growing frequency of wildland and grass fires in our region has increased the demand for smaller, more agile fire apparatus that can access areas unreachable by traditional Type 1 structural engines. A type 6 engine can operate effectively on narrow roads, rural properties, utility corridors, and uneven terrain, allowing crews to reach ignition points quickly and prevent fires from escalating into larger incidents. The availability of this type of apparatus is critical to the Fire Department’s ability to protect lives, property, and essential infrastructure in WUI zones by providing rapid access to areas where conventional fire apparatus may be limited or unable to respond effectively.
The City municipal code section 3.20.060(D)(6) allows the City to dispense with bidding when it is determined that the equipment is not available from local vendors and that it is in the best interests of the City, and to the City’s economic advantage that such equipment be obtained at the lowest possible cost by entering into a cooperative procurement contract that was competitively bid within the last thirty-six months or is one that is still active and valid.
Downtown Ford Sacramento has entered into a competitive procurement contract with the State of California to offer discount pricing for their equipment. Staff recommend adoption of the Resolution to dispense with bidding for the purchase of one 2027 Ford F550 Regular Cab Chassis outfitted with a CTEC Fire Patrol Unit, 2027 model year, in the amount of $157,734.25 for the Fire Department.
FISCAL IMPACT:
On December 17, 2025, staff received Council approval to appropriate grant funds to be used towards the purchase a unit in the amount of $65,845.37. However, the quote subsequently changed to include outfitting with a CTEC Fire Patrol unit bringing the new purchase price to $157,734.25. To complete the purchase, an additional appropriation of $45,945 in Federal Grant Funds from the USDA Forest Service and USDI Bureau of Land Management Fund balance and $45,944 in State Grant Funds from the California Office of Emergency Services Fund balance to the Fire Department Operating Budget is necessary.
COUNCIL GOAL:
Safety and Resilience
Innovative and Efficient City Government
ATTACHMENTS:
1. Resolution
2. Quote
- Page 1 of 3 Pages -
RESOLUTION NO. _________________
A RESOLUTION OF THE BAKERSFIELD CITY
COUNCIL DISPENSING WITH FORMAL
BIDDING PROCEDURES IN THE PURCHASE OF
A GAS FORD F550 REGULAR CAB CHASSSIS
WITH CALIFORNIA TRUCK EQUIPMENT
COMPANY (CTEC) FIRE PATROL OUTFITTING
FROM DOWNTOWN FORD SACRAMENTO
AND AUTHORIZING THE USE OF
COOPERATIVE PROCUREMENT CONTRACTS
FOR THE PURCHASE OF ONE UNIT IN
ACCORDANCE WITH SECTION 3.20.060(D)(6)
OF THE BAKERSFIELD MUNICIPAL CODE.
WHEREAS, the City may enter into cooperative procurement contracts for work, supplies, equipment or materials without competitive bidding pursuant to Bakersfield Municipal Code Section 3.20.060(D)(6); and
WHEREAS, prices offered through national cooperative procurement contracts are generally less expensive than the prices for work, supplies, equipment or materials the City is currently paying; and WHEREAS, purchasing work, supplies, equipment, or materials for the City through national cooperative procurement contracts is to the City’s economic advantage and in the City’s best interests; and
WHEREAS, Bakersfield Municipal Code Section 3.20.060(D)(6) allows the City to dispense with bidding procedures when it is determined that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active; and
WHEREAS, the process used to determine the vendors for the cooperative procurement contracts herein substantially comply with the City’s procurement process, including public advertisement for sealed bids and awards determined on the basis of best value.
- Page 2 of 3 Pages -
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
1. The above recitals are true and correct and are incorporated herein by reference.
2. The Council finds that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active.
3. The Finance Director or his designee is authorized to dispense with bidding in accordance with section 3.20.060(D)(6) of the Bakersfield Municipal Code and to negotiate the purchase of same.
4. The Finance Director or his designee is authorized to purchase one Gas Ford F550 Regular Cab Chassis with CTEC fire patrol outfitting through the State of California pursuant to the terms and conditions of Contract No. 1-22-23- 20F with Downtown Ford Sacramento and may be amended from time to time and including any options to renew that may be exercised by the State of California.
5. That the Finance Director or designee is authorized to negotiate and execute any documents that may be necessary to register with, and purchase work, supplies, equipment, or materials from the vendors herein. --oo0oo--
- Page 3 of 3 Pages -
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ____________________________, by the following vote:
YES: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCIL MEMBER ______________________________________________________________ ABSTAIN: COUNCIL MEMBER ______________________________________________________________ ABSENT: COUNCIL MEMBER _______________________________________________________________
________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED _________________
By _________________________
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By ______________________________
ASHLEY E. ZAMBRANO
Chief Assistant City Attorney
B 8 1 1 2 6
Name DATE 10/27/2026
Address SALES REP BETHANY
City BAKERSFIELD State CA Zip 93301 PHONE 916-848-3177
Phone FOB BAKERSFIELD
Qty Unit Price TOTAL
1 $53,398.00 $53,398.00
CLIN: 52
OPTIONS
1 $3,030.50 $3,030.50
1 $1,395.90 $1,395.90
-1 $166.00 ($166.00)
1 $395.00 $395.00
1 $215.00 $215.00
1 $225.00 $225.00
1 $445.00 $445.00
1 $150.00 $150.00
1 $190.00 $190.00
1 $515.00 $515.00
1 $0.00
1 $200.00 $200.00
1 $85,624.83 $85,624.83
1 $85.00 $85.00
SubTotal $145,703.23
DELIVERY $0.00
Cash SALES TAX $12,020.52
Check CA Tire Tax $10.50
Credit Card TOTAL $157,734.25
Name
CC #
Expires
F5H - CHANGE TO 4X4
X5G - CHANGE TO SUPER CAB
145/60 - CHANGE TO 168" WB / 60" CA
X8L - 4.88 LIMITED SLIP AXLE
67B - HD ALTERNATOR
43C - 110AV/400W OUTLET
41P - SKID PLATES
86M - DUAL BATTERY - INCLUDED
CTEC - FIRE PATROL UNIT - 16546
SIGNATURE________________________________DATE_________
$500 DISCOUNT WITH PAYMENT IN 20 DAYS
Office Use Only
SALES TAX CALCULATED AT:
EXTERIOR COLOR:
BASED ON REGISTRATION ADDRESS
PRICING BELOW SUBJECT TO CHANGE
DOC FEE
18B - RUNNING BOARDS
TGM - TRACTION TIRES LT225/70RX 19.5G BSW TRAC (4) A/S (2) 872 - REAR VIEW CAMERA AND PREP KIT
VSO PAINT
CITY OF BAKERSFIELD
1600 TRUXTUN AVE
ATTN: JAIME FLORES 661-326-3496
8.250%
RACE RED
STATE OF CALIFORNIA CONTRACT:
X5H / 68H
2027 FORD F550 REGULAR CAB CHASSIS GAS
1-22-23-20F
525 N16TH STREET, SACRAMENTO, CA 95811
PHONE: 916-299-3529
QUOTE
Payment Details
Customer
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 5, 2026
SUBJECT: Dispense with bidding for the purchase of elevator modernization services for City Hall North and Dignity Health Arena.
(Ward 2)
1. Resolution determining that elevator modernization work can most efficiently be procured through cooperative procurement bidding procedures from TK Elevator Corporation and authorizing the Finance Director to dispense with bidding therefore in the amount of $1,675,000.
2. Agreement with TK Elevator Corporation to modernize the elevators at City Hall North and the Dignity Health Arena for a one-year term in an amount of $1,675,000.
3. Authorize staff to approve, as necessary, up to $325,000 in City controlled contingency for unforeseen conditions encountered during the construction of the project for a total budget of $2,000,000.
RECOMMENDATION:
Staff recommend adoption of the resolution and approval of the agreement and City controlled contingency.
BACKGROUND:
City Hall North, located at 1600 Truxtun Avenue, is a five-story building with one underground parking level and was constructed in approximately 1995. The building's two existing elevators are original to the building and are now more than 30 years old, exceeding their anticipated useful life and operating with diminished energy efficiency. Due to their age, the elevators require increasingly frequent repairs, and replacement parts for certain components have become obsolete. Component failures and multiple instances of passenger entrapment have also occurred, creating safety concerns for City employees and members of the public visiting the building. In 2025, both elevators were simultaneously out of service for more than two weeks, resulting in thousands of dollars in repair costs to the City. Staff recommend modernizing both elevators to improve reliability, operational efficiency, and passenger safety.
The Dignity Health Arena, located at 1001 Truxtun Avenue, has one indoor passenger elevator and one freight elevator, both of which are outdated and have experienced frequent failures over the past six years, resulting in thousands of dollars in repair costs to the City. The passenger elevator serves all four levels of the facility and has experienced multiple instances of passenger entrapment, creating safety concerns for City staff and members of the public. Due to the age of the elevators, replacement parts have also become increasingly obsolete, making ongoing maintenance and repairs more difficult. Reliable passenger elevator service is essential to accommodate daily facility operations and special events, which can involve hundreds of passengers in a single evening. The freight elevator is used by maintenance staff and event rigging crews to transport equipment necessary for daily operations and special events. Its continued reliability is equally important to maintaining safe and efficient facility operations. Staff recommend modernizing both elevators to improve reliability, operational efficiency, and passenger safety.
The City municipal code section 3.20.060(D)(6) allows the City to dispense with bidding when it is determined that work, supplies, equipment or materials is not available from local vendors and that it is in the best interests of the City, and to the City’s economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost by entering into a cooperative procurement contract that was competitively bid within the last thirty-six months or is one that is still active and valid.
TK Elevator Corporation has entered into a competitive procurement contract with Sourcewell to offer discount pricing for their work. Staff recommend adoption of the Resolution to dispense with bidding to procure elevator modernization services in the amount of $1,675,000 for the elevator modernization services at City Hall North building and the Dignity Health Arena.
The City of Bakersfield Municipal Code section 3.20.105(E) authorizes Public Works Contract Amendments to be executed via Change Order, provided that Change Orders which exceed $25,000 must be approved by the City Council. Staff is requesting pre-approval of up to $325,000 for City-controlled contingency for unforeseen conditions encountered during construction of this project, to be executed via authorized Change Order(s). Any costs which exceed the City Council approved contingency, cumulative or otherwise, will require action and approval from the City Council. The City-controlled contingency will save staff time by eliminating the need to prepare separate Council reports for each routine change order that may arise during the project. Any unused contingency funds will be returned to the fund balance upon project completion.
FISCAL IMPACT:
Sufficient funds are budgeted in the Fiscal Year 2026-27 Capital Outlay Fund for this project, no additional funds are anticipated for this project.
COUNCIL GOAL:
Reliable Infrastructure
Safety and Resilience
ATTACHMENTS:
1. Resolution
2. Agreement
3. Cooperative Quote
- Page 1 of 3 Pages -
RESOLUTION NO. _________________
A RESOLUTION OF THE BAKERSFIELD CITY
COUNCIL DISPENSING WITH FORMAL
BIDDING PROCEDURES IN THE PURCHASE OF
ELEVATOR MODERNIZATION SERVICE FOR
THE CITY HALL NORTH AND THE DIGNITY
HEALTH ARENA FROM TK ELEVATOR
CORPORATION AND AUTHORIZING THE USE
OF COOPERATIVE PROCUREMENT
CONTRACTS FOR THE PURCHASE OF THE
SERVICE IN ACCORDANCE WITH SECTION
3.20.060(D)(6) OF THE BAKERSFIELD
MUNICIPAL CODE.
WHEREAS, the City may enter into cooperative procurement contracts for work, supplies, equipment or materials without competitive bidding pursuant to Bakersfield Municipal Code Section 3.20.060(D)(6); and
WHEREAS, prices offered through national cooperative procurement contracts are generally less expensive than the prices for work, supplies, equipment or materials the City is currently paying; and WHEREAS, purchasing work, supplies, equipment, or materials for the City through national cooperative procurement contracts is to the City’s economic advantage and in the City’s best interests; and
WHEREAS, Bakersfield Municipal Code Section 3.20.060(D)(6) allows the City to dispense with bidding procedures when it is determined that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active; and
WHEREAS, the process used to determine the vendors for the cooperative procurement contracts herein substantially comply with the City’s procurement process, including public advertisement for sealed bids and awards determined on the basis of best value.
- Page 2 of 3 Pages -
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
1. The above recitals are true and correct and are incorporated herein by reference.
2. The Council finds that work, supplies, equipment or materials are not available from local vendors and that it is in the best interests of the city, and to the city's economic advantage that such work, supplies, equipment or materials be obtained at the lowest possible cost for the quality needed by entering into a city, county, state or federal government cooperative procurement contract that was competitively awarded by another governmental agency within the last 36 months or is one that is still current and active.
3. The Finance Director or his designee is authorized to dispense with bidding in accordance with section 3.20.060(D)(6) of the Bakersfield Municipal Code and to negotiate the purchase of same.
4. The Finance Director or his designee is authorized to purchase Elevator Modernization service through Sourcewell pursuant to the terms and conditions of Contract No. 050224-TKE with TK Elevator Corporation and may be amended from time to time and including any options to renew that may be exercised by Sourcewell.
5. That in the event certain work, supplies, equipment or materials needed by the City are available through more than one of these cooperative procurement contracts and within the timeframe required by the City, the Finance Director or his designee shall purchase such work, supplies, equipment or materials from the vendor offering the lowest price.
6. That the Finance Director or designee is authorized to negotiate and execute any documents that may be necessary to register with, and purchase work, supplies, equipment, or materials from the vendors herein. --oo0oo--
- Page 3 of 3 Pages -
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ____________________________, by the following vote:
YES: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCIL MEMBER ______________________________________________________________ ABSTAIN: COUNCIL MEMBER ______________________________________________________________ ABSENT: COUNCIL MEMBER _______________________________________________________________
________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED _________________
By _________________________
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By ______________________________
ASHLEY E. ZAMBRANO
Chief Assistant City Attorney
INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 1 of 11 AGREEMENT NO. ___________________
INDEPENDENT CONTRACTOR'S AGREEMENT
[Over $100,000]
This INDEPENDENT CONTRACTOR’S AGREEMENT (“Agreement”) is made and entered into on _______________________, by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and TK ELEVATOR CORPORATION, a Corporation authorized to do business in California (referred to herein as “CONTRACTOR”).
R E C I T A L S
WHEREAS, CONTRACTOR represents that CONTRACTOR is experienced, well qualified, and a specialist in the field of elevator modernization; and WHEREAS, CITY desires to modernize the elevator at City Hall North and the Dignity Health Arena to improve the reliability, functionality, and overall condition of the elevator systems; and
WHEREAS, CONTRACTOR has submitted a cooperative quote and fee schedule (collectively referred to as “Contractor’s Modernization Proposal”) for the elevator modernization work, which CITY has reviewed, approved, and accepted, and CITY desires to obtain CONTRACTOR to perform the work in accordance with the terms and conditions of this Agreement and Contractor’s Modernization Proposal incorporated herein as Exhibit A.
NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree as follows:
1. SCOPE OF WORK. In exchange for the Compensation (defined below), CONTRACTOR shall perform the following: Elevator modernization at City Hall North and the Dignity Health Arena as described in Contractor’s Modernization Proposal dated August 11, 2026, labeled as Exhibit A attached hereto and incorporated herein (“Scope of Work”). The Scope of Work shall include all items and procedures necessary to properly complete the task CONTRACTOR has been hired to perform, whether specifically included in the Scope of Work or not.
2. COMPENSATION/PAYMENT PROCEDURE. Subject to the conditions of this section, CITY will pay CONTRACTOR as follows for performing the Scope of INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 2 of 11 Work (“Compensation”):
A total, lump sum payment of ONE MILLION SIX HUNDRED SEVENTY-FIVE THOUSAND DOLLARS ($1,675,000) after the Scope of Work is completed to CITY’s satisfaction in accordance with the costs and fees set forth in EXHIBIT A. In no case will the CITY compensate CONTRACTOR more than TWO MILLION DOLLARS ($2,000,000) for performing the Scope of Work.
2.1 City shall pay Contractor Fifty percent (50%) of the contract prior to material being released for fabrication. This initial progress payment will be applied to project management, permits, engineering and shop drawings, submittals and drilling mobilization (if required).
Twenty-Five percent (25%) shall be due and payable when the material has been furnished. Material is considered furnished when received at the job site or Contractor’s warehouse. Receipt of payment is required prior to mobilization of labor. Final payment shall be made within 30 days from City’s final acceptance of Contractor’s work. In no event shall either party be liable to the other for any special, liquidated or consequential damages.
2.2 All taxes, tariffs, duties, permit and/or license fees imposed upon Contractor as of the date of the execution of this Agreement are included in the price of the Agreement. After the execution of this Agreement and in addition to the Agreement price, Purchaser is also responsible to pay Contractor for any new (or any increase in): (1) applicable taxes, tariffs, duties, permit and/or license fees; (2) charges from its suppliers for any of the applicable materials and/or components: (A) due to supply chain issues, the imposition of new or increased taxes, tariffs, or other charges imposed by applicable governmental authorities; (B) if the release of materials called for in this Agreement occurs after the milestone mentioned earlier in this Agreement; and/or (C) if the completion of the work called for in this Agreement occurs after the milestone mentioned earlier in this Agreement; and/or (3) charges from Contractor’s shippers and/or freight forwarders.
2.3 CITY will pay CONTRACTOR as set forth herein within 30 days after CONTRACTOR submits an itemized invoice for the portions of the Scope of Work completed and that invoice is approved by CITY. The Compensation will be the total amount paid to CONTRACTOR for performing the Scope of Work. To the extent additional fees and costs are incurred which are not incorporated in the Proposal attached in Exhibit A, such fees and costs shall only be due and INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 3 of 11 payable by CITY if permitted by this Agreement upon timely delivery of an invoice detailing such charges and fees.
3. TERM. Unless terminated sooner, as set forth herein, this Agreement shall terminate on October 7, 2027.
4. TERMINATION. Either party may terminate this Agreement after giving the other party written notice, as provided herein, ten days before the termination is effective. In the event of termination for any reason, City agrees to pay Contractor the proportional contract value of work performed including contract value of materials in process of fabrication, in transit, stored at jobsite or in Contractor’s possession. City agrees to limit possession to work, and materials previously paid for by City to Contractor.
5. ACCOUNTING RECORDS. CONTRACTOR shall maintain accurate accounting records and other written documentation pertaining to all costs incurred in performance of this Agreement. Such records and documentation shall be kept at CONTRACTOR's office during the term of this Agreement, and for a period of three (3) years from the date of the final payment hereunder, and made available to CITY representatives upon request at any time during regular business hours.
6. ASSIGNMENT. Neither this Agreement nor any rights, interests, duties, liabilities, obligations or responsibilities arising out of, concerning or related in any way to this Agreement (including, but not limited to, accounts, actions, causes of action, claims, damages, demands, liabilities, losses, obligations, or reckonings of any kind or nature whatsoever, for compensatory or exemplary and punitive damages, or declaratory, equitable or injunctive relief, whether based on contract, equity, tort or other theories of recovery provided for by the common or statutory law) may be assigned or transferred by any party. Any such assignment is prohibited, and shall be unenforceable and otherwise null and void without the need for further action by the non-assigning party or parties.
7. BINDING EFFECT. The rights and obligations of this Agreement shall inure to the benefit of, and be binding upon, the parties to the Agreement and their heirs, administrators, executors, personal representatives, successors and assigns.
8. COMPLIANCE WITH ALL LAWS. CONTRACTOR shall, at CONTRACTOR’s sole cost, comply with all of the requirements of Municipal, State, and Federal authorities now in force, or which may hereafter be in force, pertaining to this Agreement, and shall faithfully observe in all activities relating to or growing out of this Agreement all Municipal ordinances and State and INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 4 of 11 Federal statutes, rules or regulations, and permitting requirements now in force or which may hereafter be in force including, without limitation, obtaining a City of Bakersfield business tax certificate (Bakersfield Municipal Code Chapter 5.02) where required.
9. CORPORATE AUTHORITY. Each individual signing this Agreement on behalf of entities represents and warrants that they are, respectively, duly authorized to sign on behalf of the entities and to bind the entities fully to each and all of the obligations set forth in this Agreement.
10. COUNTERPARTS. This Agreement may be executed in any number of counterparts, each of which shall be considered as an original and be effective as such.
11. DIRECTION. CONTRACTOR retains the right to control or direct the way the services described herein are performed.
12. EQUIPMENT. CONTRACTOR will supply all equipment, tools, materials and supplies necessary to perform the services under this Agreement.
13. EXECUTION. This Agreement is effective upon execution. It is the product of negotiation, and all parties are equally responsible for authorship of this Agreement. Section 1654 of the California Civil Code shall not apply to the interpretation of this Agreement.
14. EXHIBITS. In the event of a conflict between the terms, conditions or specifications set forth in this Agreement and those in exhibits attached hereto, the terms, conditions, or specifications set forth in this Agreement shall prevail. All exhibits to which reference is made in this Agreement are deemed incorporated in this Agreement, whether attached.
15. FURTHER ASSURANCES. Each party shall execute and deliver such papers, documents, and instruments, and perform such acts as are necessary or appropriate, to implement the terms of this Agreement and the intent of the parties to this Agreement.
16. GOVERNING LAW. The laws of the State of California will govern the validity of this Agreement and its interpretation and performance. Any litigation arising in any way from this Agreement shall be brought in Kern County, California.
17. INCLUDED DOCUMENTS. Any bid documents, including, without limitation, special provisions and standard specifications and any Request for Proposals, Request for Qualifications and responses thereto relating to this INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 5 of 11 Agreement are incorporated by reference as though fully set forth herein.
18. INDEPENDENT CONTRACTOR. This Agreement calls for CONTRACTOR’s performance of the Scope of Work as an independent contractor.
CONTRACTOR is not an agent or employee of the CITY for any purpose and is not entitled to any of the benefits provided by CITY to its employees. This Agreement shall not be construed as forming a partnership or any other association with CONTRACTOR other than that of an independent contractor.
19. INSURANCE.
19.1 Types and Limits of Insurance. In addition to any other insurance or security required under this Agreement, CONTRACTOR must procure and maintain, for the duration of this Agreement, the types, and limits of insurance below ("Basic Insurance Requirements").
19.1.1 Automobile liability insurance, providing coverage for owned, non-owned, and hired autos on an occurrence
basis for bodily injury, including death, of one or more persons, property damage, and personal injury, with limits of not less than $1,000,000 per occurrence.
19.1.2 Commercial general liability insurance, unless otherwise approved by CITY’s Risk Manager, providing coverage on
an occurrence basis for bodily injury, including death, of one or more persons, property damage, and personal
injury, with limits of not less than $1,000,000 per occurrence.
The policy must:
19.1.2.1 Provide contractual liability coverage for the terms of this Agreement.
19.1.2.2 Provide products and completed operations
coverage.
19.1.2.3 Provide premises, operations, and mobile
equipment coverage; and
19.1.2.4 Contain an additional insured endorsement in
favor of CITY and its mayor, council, officers,
agents, employees, and designated volunteers.
19.1.3 Workers' compensation insurance with limits of not less than INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 6 of 11 $1,000,000 per occurrence. In accordance with the
provisions of Labor Code Section 3700, every contractor will be required to secure the payment of compensation to his employees. Pursuant to Labor Code Section 1861,
CONTRACTOR must submit to CITY the following
certification before beginning any work on the
Improvements:
I am aware of the provisions of Section 3700 of the
Labor Code which require every employer to be
insured against liability for worker’s compensation or
to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such
provisions before commencing the performance of
the work of this contract.
By executing this Agreement, CONTRACTOR is submitting the certification required above.
The policy must contain a waiver of subrogation in favor of CITY and its mayor, council, officers, agents, employees, and designated volunteers.
19.2 General Provisions Applying to All Insurance Types.
19.2.1 All policies required of CONTRACTOR must be written on a first-dollar coverage basis or contain a deductible provision.
Subject to CITY’s advance approval, CONTRACTOR may
utilize a self-insured retention in any or all of the policies provided, but the policy or policies may not contain
language, whether added by endorsement or contained
in the policy conditions, that prohibits satisfaction of any self-insured provision or requirement by anyone other than the named insured or by any means including other
insurance or which is intended to defeat the intent or
protection of an additional insured.
19.2.2 All policies required of CONTRACTOR must be primary insurance as to CITY and its mayor, council, officers, agents, employees, or designated volunteers and any insurance or self-insurance maintained by CITY and its mayor, council, officers, agents, employees, and designated volunteers
must be excess of CONTRACTOR’s insurance and must not
contribute with it.
INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 7 of 11
19.2.3 The insurance required above, except for workers’ compensation insurance, must be placed with insurers with a Best’s rating as approved by CITY’s Risk Manager, but in no event less than A-:VII. Any deductibles, self-insured retentions, or insurance in lesser amounts, or lack of certain types of insurance otherwise required by this Agreement, or insurance rated below Best’s A-:VII, must be declared prior to execution of this Agreement and approved by CITY in
writing.
19.2.4 The insurance required in this section must be maintained until the Scope of Work is satisfactorily completed as
evidenced by CITY’s written acceptance. All policies must provide that there will be continuing liability thereon, notwithstanding any recovery on any policy.
19.2.5 Full compensation for all premiums which the CONTRACTOR is required to pay to satisfy the Basic Insurance
Requirements shall be considered as included in the prices paid for the performance of the Scope of Work, and no
additional allowance will be made therefor or for additional premiums which may be required by extensions of the
policies of insurance.
19.2.6 It is further understood and agreed by CONTRACTOR that its liability to CITY will not in any way be limited to or affected by the amount of insurance obtained and carried by
CONTRACTOR in connection with this Agreement.
19.2.7 Unless otherwise approved by CITY, if any part of the Scope of Work is subcontracted, the Basic Insurance Requirements must be provided by, or on behalf of, all subcontractors even if CITY has approved lesser insurance requirements for CONTRACTOR, and all subcontractors must agree in writing to be bound by the provisions of this section.
19.2.8 Additional insured coverage shall only apply to the extent any damages covered by the policy are determined to be
caused by Contractor’s acts, actions, omissions or neglects and not to the extent caused by the additional insured’s own acts, actions, omissions, or neglects or for bare
allegations. Waiver of subrogation shall be limited to the extent any claim is caused by Contractor. Any self-insured INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 8 of 11 retention does not require approval. Deductibles or self-insured retentions shall not be disclosed nor limited in any way.
20. INTERPRETATION. Whenever the context so requires, the masculine gender includes the feminine and neuter, and the singular number includes the plural.
21. KEY PERSONNEL. CONTRACTOR shall name all key personnel to be assigned to perform the Scope of Work. All key personnel shall be properly licensed and have the experience to perform the work called for under this Agreement. CONTRACTOR shall provide background for each of the key personnel including, without limitation, resumes and work experience performing work like the Scope of Work. CITY reserves the right to approve key personnel. Once the key personnel are approved, CONTRACTOR shall not change such personnel without CITY’s written approval.
22. LICENSES. CONTRACTOR shall, at its sole cost and expense, keep in effect or always obtain during the term of this Agreement any licenses, permits and approvals which are legally required for CONTRACTOR to practice its profession and perform the Scope of Work. If CONTRACTOR is a corporation, at least one officer or key employee shall hold the required licenses or professional degrees. If CONTRACTOR is a partnership, at least one partner shall hold the required licenses or professional degrees.
23. MERGER AND MODIFICATION. This Agreement sets forth the entire agreement between the parties and supersedes all other oral or written representations. This Agreement may be modified only in a writing approved by the City Council and signed by all the parties.
24. MUTUAL HOLD HARMLESS. The parties shall hold each other harmless from any and all actual or alleged claims, demands, causes of action, liability, loss, damage and/or injury (to property or persons, including without limitation wrongful death), whether brought by either party, an individual or other entity, or imposed by a court of law or by administrative action of any federal, state, or local governmental body or agency, arising out of or incident to any acts, omissions, negligence, or willful misconduct of either party, its personnel, employees, agents, contractors, or volunteers in connection with or arising out of this Agreement.
25. NO WAIVER OF DEFAULT. The failure of any party to enforce against another party any provision of this Agreement shall not constitute a waiver of that party's right to enforce such a provision later and shall not serve to vary the terms of this Agreement.
INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 9 of 11
26. NON-INTEREST. No CITY officer or employee shall hold any interest in this Agreement (California Government Code section 1090).
27. NOTICES. All notices relative to this Agreement shall be given in writing and shall be personally served or sent by certified or registered mail and be effective upon actual personal service or depositing in the United States mail. The parties shall be addressed as follows, or at any other address designated by notice:
CITY: CITY OF BAKERSFIELD
CITY HALL
1600 Truxtun Avenue
Bakersfield, California 93301
CONTRACTOR: TK ELEVATOR CORPORATION
PO Box 3796
Carol Stream, IL 60132
Phone: 916-813-9668
28. RESOURCE ALLOCATION. All CITY obligations under the terms of this Agreement are subject to the appropriation and allocation of resources by the City Council.
28.1 CITY agrees to supply CONTRACTOR with suitable onsite storage for the tools and equipment required pursuant to this Agreement. A charge may be assessed to CITY at CONTRACTOR’S current rates for any additional handling or re-transportation of the equipment required pursuant to this Agreement. Further, in the event CITY is unable to provide onsite storage, CONTRACTOR will assess CITY a per-unit, per-month charge at CONTRACTOR’S current rates for offsite storage. CONTRACTOR is solely responsible for the safe handling and use of tools and equipment under this Agreement, whether stored onsite or offsite, and CITY shall not be liable for any damages, injuries, losses or claims arising out of CONTRACTOR'S storage of tools and equipment.
29. SB 854 COMPLIANCE. To the extent Labor Code Section 1771.1 applies to this Agreement, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, be subject to the requirements of Section 4104 of the Public Contract Code or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5.
INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 10 of 11 It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. The prime contractor is required to post job site notices in compliance with Title 8 California Code of Regulations Section 16451. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
30. STANDARD OF PERFORMANCE. The Scope of Work shall be performed in conformity with all legal requirements and industry standards observed by a specialist of CONTRACTOR’s profession in California.
31. STARTING WORK. CONTRACTOR shall not begin work until authorized to do so in writing by CITY. No work will be authorized before the date first written above. Schedule and all future changes thereto shall be agreed to in writing by both parties before becoming effective. Contractor shall automatically receive an extension of time commensurate with any delay not solely caused by Contractor. If schedule modifications, not solely caused by Contractor, shall result in overtime work, City agrees to pay in accordance with Contractor’s standard charges for premium time.
32. TAX NUMBERS.
CONTRACTOR’s Federal Tax ID Number 62-1211267
CONTRACTOR is a corporation? Yes X No
(Please check one.)
33. THIRD PARTY CLAIMS. In the case of public works contracts, CITY will timely notify CONTRACTOR of third-party claims relating to this Agreement. CITY shall be allowed to recover from CONTRACTOR, and CONTRACTOR shall pay on demand, all costs of notification.
34. TITLE TO DOCUMENTS. All documents, plans, and drawings, maps, photographs, and other papers, or copies thereof prepared by CONTRACTOR pursuant to the terms of this Agreement, shall, upon preparation, become CITY property.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the date first written above.
INDEPENDENT CONTRACTOR'S AGREEMENT – Over $100,000 Page 11 of 11 "CITY" “CONTRACTOR”
CITY OF BAKERSFIELD TK ELEVATOR CORPORATION
By:________________________________ By:_________________________________ KAREN GOH Print Name:
Mayor Title: __
APPROVED AS TO CONTENT:
PUBLIC WORKS DEPARTMENT
By:_______________________________
ZACHARY MEYER
Public Works Director
APPROVED AS TO FORM: COUNTERSIGNED:
(Deputy) City Attorney:_______________________ Finance Director: _____________________
ASHLEY ZAMBRANO RANDY MCKEEGAN
Insurance:____________
Attachment(s): Exhibit A
Natalie Marquina
Contract Analyst
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 1
City Hall North & Dignity Health Arena -Aug2026 August 11, 2026 Purchaser: City Of Bakersfield Projects
Location:
City Hall North Dignity Health Arena
Address: 1601 Truxtun Ave Address: 1601 Truxtun Ave 1001 Truxtun Ave Bakersfield, CA 93309 Bakersfield, CA Bakersfield, CA
TK Elevator Corporation (hereinafter "TK Elevator") is dedicated to delivering City Of Bakersfield (hereinafter “Purchaser”) the safest, highest quality vertical transportation solutions. I am pleased to present this customized Proposal (the “Proposal”) in the amount of $1,675,000.00 inclusive of all applicable sales and use taxes to modernize the elevator equipment described in the pages that follow at the above-referenced location.
Our modernization package is engineered specifically for your elevator system and will include the elevator mechanical and electrical components being replaced, refurbished or retained.
The price above includes those value added taxes, tariffs, duties, and/or similar charges that are in effect as of the date of this proposal. The price of this Proposal is subject to escalation - even after Purchaser’s acceptance of this Proposal - under certain circumstances including any new or increase in taxes, tariffs, or other charges imposed by applicable governmental authorities and/or TK Elevator being subjected to increased charges by its suppliers, shippers and/or freight forwarders as set forth in the terms and conditions in this Proposal.
Furthermore, all preparatory work by other trades must be completed and elevator equipment shipped by 10-23- 2026 and the installation must be completed by 05-13-2027, otherwise, the price is also subject to increase.
If not accepted within twenty-one (21) calendar days of the date of this Proposal or the date presented to Purchaser, this Proposal shall automatically be revoked and shall be null and void.
In the event you have any questions regarding the content of this Proposal please contact me at +1 916 813-9668 We appreciate your consideration.
Regards,
Steve Boisvert
Steve Boisvert, [email protected] | +1 916 813-9668 TK Elevator Corporation, 940 Riverside Pkwy Ste 20, W. Sacramento, CA 95605 Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 2
SCOPE OF WORK
Building : City Hall North
1600 Truxtun Ave
Groups Included
Group Name # of units Equipment Type
Group 1 Passenger 2x units - Traction – 6 Stop
Building : Arena
1600 Truxtun Ave
Groups Included
Group Name # of units Equipment Type
Group 1 Passenger 1x Unit - Hydraulic – 3 Stops
Group 2 Freight 1x Unit - Hydraulic – 3 Stops
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 3
Description of Work - City Hall North
Controller
Item Description Option Installed On
TAC 32T Controller (Includes Options listed below)
• 24 VDC Signal Voltage
• Electronic Door Detector Interface
New Car 1,Car 2
eMax Monitoring Device Provisions New Group 1
Machine Room Wiring Package New Car 1,Car 2
tkE Green Drive 400E (2109CD006) VVVF AC Drive / Regenerative 60R New Car 1,Car 2 Emergency Power (10-D-4A) New Car 1,Car 2
Seismic Operation / Counterweight Derailment New Car 1,Car 2 Tenant Security 3-1 (Card Reader) New Car 1,Car 2
Encoder Board for Motors by Others (part no. 546AV11) New Car 1,Car 2 Shaker Box (For Group) New Group 1
Auto Fan Light Shutdown (Sleep Mode) New Car 1,Car 2
Fire Service New Car 1,Car 2
Hall Lanterns New Car 1,Car 2
Hoistway Access New Car 1,Car 2
Door Operator Controls New Car 1,Car 2
Group Operation New Car 1,Car 2
Loadweigher Controls New Car 1,Car 2
User Interface Tool New Car 1,Car 2
Hoistway Enable/Inspection Operation New Car 1,Car 2
Independent Service New Car 1,Car 2
Governor
Item Description Option Installed On
Retain Governor Retain Car 1,Car 2
Car
Item Description Option Installed On
Retain Safeties Retain Car 1,Car 2
Crosshead data tag (for existing car slings) New Car 1,Car 2 tkE Cable Strain Loadweigher (for 5 ropes) New Car 1,Car 2 Fan: Two Speed New Car 1,Car 2
Fan Grill Standard New Car 1,Car 2
Toe Guard for 2000 code (48") New Car 1,Car 2
Car Guides Wheels Replacement New Car 1,Car 2
Cab Wiring Material (200MK1) New Car 1,Car 2
5 Pin Lock with electric contact for Car Top Exit New Car 1,Car 2 Car Top Railing New Car 1,Car 2
Hoistway Door Equipment
Item Description Option Installed On
Retain Hoistway Doors Retain Car 1,Car 2
Hanger Rollers New Car 1,Car 2
Interlock / Pick up Assemblies for existing Dover Operators. Includes closers. (Front) New Car 1,Car 2 Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 4
Machine
Item Description Option Installed On
Deflector/Secondary Sheave New Car 1,Car 2
New Machine New Car 1,Car 2
Ascending Motion (Rope Gripper or other) New Car 1,Car 2 Rope Retainers New Car 1,Car 2
Hoist Cables, traction steel, preformed New Car 1,Car 2 Car/Cwt shackles w/springs (pairs per 1/2" or 5/8" rope) New Car 1,Car 2 Cab
Item Description Option Installed On
Cab Interior via Allowance of $35,000 per Elevator (Total $70,000) Allowance Car 1,Car 2 Retain Cab Flooring Retain Car 1,Car 2
Car Door (SSCO, #4 Muntz) New Car 1,Car 2
Pit Equipment
Item Description Option Installed On
Buffer Oil New Car 1,Car 2
Counterweight Derailment detector (ring and string) New Car 1,Car 2 Pit Stop Switch New Car 1,Car 2
Counterweight Guides Wheels Replacement New Car 1,Car 2 Hoistway Equipment
Item Description Option Installed On
TAC 32T Field Friendly Wiring Package:
• Includes single flat traveling cable with coax
• hoistway wiring
• interlock wiring
• interlock connectors
• discrete wiring
• FIBER OPTIC CABLE, HOISTWAY PIPING & DUCT ARE NOT INCLUDED.
New Car 1,Car 2
APS (Absolute Positioning System) for TAC32T with Final Limit Switches New Car 1,Car 2 Screening New Group 1
Car Door Equipment
Item Description Option Installed On
Micro Light (Front) New Car 1,Car 2
LD-16 Plus Door Operator with Complete carside equipment (FRONT) • includes Adapter kit (Tracks & Hangars), Clutch (w/ Car Door Lock latch & contact), & Car Top Inspection station (w/ alarm signal and Flooded Pit Jewel) New Car 1,Car 2
Car Fixtures
Item Description Option Installed On
Main Car Station Includes Options Below New Car 1,Car 2 • Column Type Swing Return for New/Existing Dover/tkE Cabs) New Car 1,Car 2 Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 5
Item Description Option Installed On
Vandal Resistant Floor Buttons New Car 1,Car 2
Cast Braille Plates for Car Features New Car 1,Car 2
Standard Key Switch Package
• Fan
• Light
• Independent
• Stop
• Inspection/Hoistway Enable)
New Car 1,Car 2
Emergency Light mounted in COP New Car 1,Car 2
2004 and later Fire Service Phase II Features (includes instructions signage) New Car 1,Car 2 Handicap Signal (Passing signal) New Car 1,Car 2
Position Indicator (2" CE Segmented) New Car 1,Car 2
ADA Phone System integral with COP (Rath) New Car 1,Car 2 Speaker Pattern for Intercom System/ADA Phone New Car 1,Car 2 Locked Service Cabinet New Car 1,Car 2
Certificate Window New Car 1,Car 2
#4 Muntz Bronze Finish New Car 1,Car 2
Bar Style Button New Car 1,Car 2
Seismic Operation Jewel New Car 1,Car 2
Card Reader Provisions (Space only) New Car 1,Car 2
Voice Annunciator (mounted in COP)
• Standard features only
• additional costs apply for custom features
New Car 1,Car 2
Smart Rescue Phone 5 Standalone New City Hall North
Hall Fixtures
Item Description Option Installed On
Terminal Hall Stations (Surface Mounted) with
• Appendix O (Polycarbonate insert flame)
• Fusion (#4 Muntz)
New Group 1
Fire Service Phase I Key Switch and Signage (Plastic) New Group 1 Car Identification Plate (Pair) New Car 1,Car 2
Hoistway Jamb Braille (Pair of Standard) (# of Floors) New Car 1,Car 2 Hall Lantern and Chime (#4 Muntz) New Car 1,Car 2
Horizontal Combination Hall Lantern and 2" Digital Hall Position Indicator (#4 Muntz) New Car 1,Car 2 Standalone Hoistway Access Station #4 Muntz New Car 1,Car 2 Standalone Emergency Power Keyswitch with Jewel #4 S/S (441) New Group 1 Hall Call Lockout Keyswitch New Group 1
Clarifications to Architectural Plans and Specifications:
• For the Update Electrical and Fire Life Safety, this proposal includes Update to Electrical and Fire Life Safety. See Appendix #1 for details of Scope of Work provided. Any deviation will be handled via Change Order. • Logistical Plan:TK Elevator will remove existing equipment and bring new equipment to the roof by using a total of two crane picks. This proposal includes an allowance of $16,000 ($8,000per elevator) for craning. Some equipment will also be delivered via the loading dock. Purchaser is responsible to shall ensure that clear, unobstructed access by and between the machine room, elevators, storage areas, work areas, etc. for the duration of the project. Any required deviation from the stated logistical plan will be submitted as a change order to the project agreement.
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 6
• TK Elevator's proposal pricing includes regenerative drive technology. In the event that the building electrical systems, including generator, are not capable of receiving the power, any required modification to the elevator design it will be provided through the Change Order process.
• For elevator modernization projects, each elevator cab will be weighed prior to the start of the modernization process of each individual unit. If the existing cabs are over 5% of the allowable weight and contracted capacity as noted on the original crosshead data tag and/or the elevators are out of balance, any additional scope of work to make code compliant will be determined on an elevator by elevator case basis and a change order for this work will be proposed accordingly. In addition, TK Elevator will not be responsible for any building structural items due to elevator exceeding the 5% allowable weight nor the under-sizing of the equipment proposed using the crosshead data tag information. Should additional or higher-rated equipment be required due to a discrepancy in the actual vs. car top crosshead data tag, additional cost may apply and will be provided via change order.
The rails, shall be retained. If any work is required on retained equipment, a change order will be provided detailing additional required scope and pricing.
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 7
Appendix #1 – Electrical City Hall North
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 8
Appendix #1 – Fire Life Safety City Hall North
Description of Work - Dignity Health Arena
Controller
Item Description Option Installed On
TAC 32H Controller (Includes Options listed below)
• 24 VDC Signal Voltage
• Electronic Door Detector Interface
New Pass #1,Freight 1
eMax Monitoring Device Provisions New Group 1,Group 2
Solid State Starters (6 or 12 leads) 460 / 575 VAC New Freight 1,Pass #1 Emergency Power (10-D-4A) New Pass #1,Freight 1
Power Freight Doors (TAC32):
• Peele (2775, 2776, 2742)
New Freight 1
Rear Door Operation New Freight 1
SAPB New Freight 1
Seismic Features New Pass #1,Freight 1
Viscosity Control (Required over 150 FPM) New Pass #1,Freight 1 THY Board / CE Driver Board New Pass #1,Freight 1
Position Indicator New Pass #1,Freight 1
Auto Fan Light Shutdown (Sleep Mode) New Pass #1,Freight 1 Fire Service New Pass #1,Freight 1
Hall Lanterns New Pass #1
Hoistway Access New Pass #1,Freight 1
Door Operator Controls New Pass #1,Freight 1
User Interface Tool New Pass #1,Freight 1
Hoistway Enable/Inspection Operation New Pass #1,Freight 1 Independent Service New Pass #1,Freight 1
Jack
Item Description Option Installed On
Retain Jack Retain Pass #1,Freight 1
Pipe Stands New Pass #1,Freight 1
Packing New Pass #1,Freight 1
Hoistway Door Equipment
Item Description Option Installed On
Retain Hoistway Doors & Bi-Parting Doors Retain Pass #1,Freight 1 Interlock / Pick Up Rollers / Closer / Gibs New Pass #1 Hanger Rollers New Pass #1,Freight 1
New Motors and Hardware for retained Hoistway doors New Freight 1 Cab
Item Description Option Installed On
Retain Cab Interior Retain Freight 1
Retain Cab Flooring Retain Pass #1,Freight 1
SnapCab Modern I Wall Panels - 3 Walls & & Frame Ceiling, Translucent Diffusers and LED Tube, Handrail
New Pass #1
Car Door (SSSS, #4 S/S (441)) New Pass #1
Power Freight Gates, New Motors & Hardware & Door Detector New Freight 1 Power Unit
Item Description Option Installed On
Power Unit New Pass #1, Freight 1
Viscosity Control (Required over 150 FPM) New Pass #1
Seismic Requirements for AP units New Pass #1
Overspeed Valve Kits for 3" (over 150 GPM) New Pass #1,Freight 1 Oil New Pass #1,Freight 1
3" Shutoff Valve Kit (Pump) New Pass #1,Freight 1
Pit Equipment
Item Description Option Installed On
3" Shutoff Valve Kit (Pit) New Pass #1,Freight 1
Pit Stop Switch New Pass #1,Freight 1
Hoistway Equipment
Item Description Option Installed On
TAC 32 Field Friendly Wiring Package:
• Includes single traveling cable
• hoistway wiring
• interlock wiring
• interlock connectors
• serial wiring
• FIBER OPTIC CABLE, HOISTWAY PIPING & DUCT ARE NOT INCLUDED.
New Pass #1,Freight 1
Steel Tape with Mounting hardware, Selector and magnets (terminal limits included) New Pass #1,Freight 1 HN Boxes (per each 2 cars, grouped) New Pass #1,Freight 1 Car
Item Description Option Installed On
Car Top Inspection Station (Stand Alone) New Freight 1
Fan: Two Speed New Pass #1
Fan Grill Standard New Pass #1
21" Toe guard New Pass #1,Freight 1
Car Guides New Pass #1,Freight 1
Cab Wiring Material New Pass #1,Freight 1
5 Pin Lock with electric contact for Car Top Exit New Pass #1,Freight 1 Car Door Equipment
Item Description Option Installed On
Micro Light (Front) New Pass #1
LD-16 Plus Door Operator with Complete carside equipment (FRONT) • includes Adapter kit (Tracks & Hangars), Clutch (w/ Car Door Lock latch & contact), & Car Top Inspection station (w/ alarm signal and Flooded Pit Jewel) New Pass #1
Door Controller New Freight 1
Retiring Cam New Freight 1
Car Fixtures
Item Description Option Installed On
Main Car Station (COP) New Pass #1,Freight 1
Car Lantern New Pass #1
Hall Fixtures
Item Description Option Installed On
Hall Stations Terminal New Group 1,Group 2
Hall Stations Intermediate New Group 1,Group 2
Hoistway Access New Pass #1,Freight 1
Car Identification Plate (Pair) New Pass #1,Freight 1
Jamb Braille (Pairs) New Pass #1,Freight 1
Combo Hall Lantern/PI New Pass #1
Emergency Power Jewel New Group 1,Group 2
Fire Service Plastic Signage and Keyswitch New Group 1
Clarifications to Architectural Plans and Specifications:
• For the Update Electrical and Fire Life Safety, this proposal includes Update to Electrical and Fire Life Safety. See Appendix #2 for details of Scope of Work provided. Any deviation will be handled via Change Order. • For the elevator that is far from the equipment room, TKE assumes that the existing conduits (oil and electrical) can be reused. It is also assumed the existing junction boxes in the ceiling are accessible without removing part of the ceiling. Any work need on the ceiling is the responsibility of the purchaser. • For elevator modernization projects, each elevator cab will be weighed (pressure reading) prior to the start of the modernization process of each individual unit. If the existing cabs are over 5% of the allowable weight and contracted capacity as noted on the original crosshead data tag and/or the elevators are out of balance, any additional scope of work to make code compliant will be determined on an elevator by elevator case basis and a change order for this work will be proposed accordingly. In addition, TK Elevator will not be responsible for any building structural items due to elevator exceeding the 5% allowable weight nor the under-sizing of the equipment proposed using the crosshead data tag information. Should additional or higher-rated equipment be required due to a discrepancy in the actual vs. car top crosshead data tag, additional cost may apply and will be provided via change order. • The rails, shall be retained. If any work is required on retained equipment, a change order will be provided detailing additional required scope and pricing.
Appendix #2 – Electrical Dignity Health Arena
Appendix #2 – Fire Life Safety Dignity Health Arena
01 Key Tasks and Approximate Lead Times
Approximate Durations/Lead Times – City Hall North
Contract execution
(can run concurrently with layout drawing package preparation and approval) TBD by Purchaser
Survey and Order of Materials
(additional time required for cab, signal, entrance preparation and approval, if applicable) 10 Weeks
Fabrication time
(from receipt of all approvals, fully executed contract, Material Release Form* and initial progress payment) 15 Weeks
Shipping:
(Tennessee to local distribution center)
2 Weeks
Crew Scheduling: Varies
Modernization of elevator system (Per Unit):
(Upon completion of all required preparatory work by others and the signed pre-installation checklist) 13 - 15 Weeks
.
Approximate Durations/Lead Times – Dignity Health Arena Contract execution
(can run concurrently with layout drawing package preparation and approval) TBD by Purchaser
Survey and Order of Materials
(additional time required for cab, signal, entrance preparation and approval, if applicable) 2 - 6 Weeks
Fabrication time
(from receipt of all approvals, fully executed contract, Material Release Form* and initial progress payment) 11 Weeks
Shipping:
(Tennessee to local distribution center)
2 Weeks
Crew Scheduling: Varies
Modernization of elevator system (Per Unit):
(Upon completion of all required preparatory work by others and the signed pre-installation checklist) 6 - 10 Weeks
*If equipment is delivered to TKE’s staging facility in accordance with the date shown on the TKE Material Release Form, and the preparatory work required by other trades is not completed, all storage charges as a result of site delays are to be paid by the Purchaser based on the storage rates noted below in this proposal.
The durations or lead times listed above are strictly approximations that can vary due to factors both within and outside of TK Elevator's control, are subject to change without notice to Purchaser and shall not be binding on TK Elevator.
02 Payment of Work
50% of the price set forth in this Proposal as modified by options selected from the section entitled “Value Engineering Opportunities & Alternates” (if applicable) will be due and payable as an initial progress payment within 30 days from TK Elevator's receipt of a fully executed copy of this Proposal. This initial progress payment will be applied to project management, permits, engineering and shop drawings, submittals, drilling mobilizations (if required) and raw material procurement. Material will be ordered once this payment is received and the parties have both executed this Proposal and the Material Release Form. 25% of the price set forth in this Proposal as modified by options selected from the section entitled “Value Engineering Opportunities & Alternates” (if applicable) shall be due and payable when the material described above has been furnished. Material is considered furnished when it has been received at the jobsite or TK Elevator staging facility. Supporting documentation of materials stored shall be limited to stored materials certificates of insurance and bills of lading. Pictures will not be provided. Receipt of this payment is required prior to mobilization of labor. 25% of the price set forth in this Proposal shall be made as progress payments throughout the life of the project. In the event TK Elevator fails to receive payment within thirty (30) days of the date of a corresponding invoice, TK Elevator reserves the right to demobilize until such a time that the payments have been brought up to date, and TK Elevator has the available manpower.
It is agreed that there will be no withholding of retainage from any billing and by the customer from any payment.
The payment terms breakdown above shall be considered the Schedule of Values for the project as written. Billing shall be submitted on or before the 25th day of the month according to the payment schedule above and accompanied by a form of G702-703 pay application/schedule of values and a conditional waiver, the format of which is hereby acknowledged and accepted.
The use of online Portals for the submission of billing shall follow the terms of the Proposal and Purchaser agrees to permit billing in accordance with the executed contract terms. Portal access and usage is to be provided free of additional charge to TK Elevator and any additional cost for such use is to be reimbursed to TK Elevator via a reimbursable change order immediately upon acceptance.
Purchaser agrees that TK Elevator shall have no obligation to complete any steps necessary to provide Purchaser with full use and operation of the installed equipment until such time as TK Elevator has been paid 100% both of the price reflected in this Proposal and for any other work performed by TK Elevator or its subcontractors in furtherance of this Proposal. Purchaser agrees to waive any and all claims to the turnover and/or use of that equipment until such time as those amounts are paid in full.
Proposal price: $1,666,000.00
Initial progress payment: (50%) $833,000.00
Material furnished: (25%) $416,500.00
Total of remaining progress
payments:
(25%) $416,500.00
Bonds: $9,000.00
Estimated contract price: $1,675,000.00
Purchaser may elect to finance all or a portion of the purchase price for the work described in this Agreement through TK Elevator’s financing partner (“Financing Partner”), subject to the Financing Partner’s approval and the terms of a separate financing agreement (“Financing Agreement”) between Purchaser and Financing Partner. Purchaser acknowledges and agrees that [(i) Financing Partner is in no way affiliated with TK Elevator, (ii) Financing Partner will make any decision to offer financing to Purchaser independently and in accordance with its internal lending policies, (iii) TK Elevator cannot guaranty that Financing Partner will agree to provide financing to Purchaser on acceptable terms or at all, (iv) TK Elevator may be compensated by the Financing Partner in the event Purchaser enters into a Financing Agreement, and TK Elevator will not be a party to the Financing Agreement and shall have no responsibility for, and hereby expressly disclaims any liability arising out of or relating to, any decision on the part of Financing Partner to provide or decline to provide financing to Purchaser, and the negotiation, execution, performance, enforcement, or termination of any Financing Agreement. Purchaser acknowledges and agrees that Purchaser shall remain unconditionally and irrevocably liable to TK Elevator for any unpaid balance owing hereunder and TK Elevator’s acceptance of the Financing Partner as a payment source shall not constitute a novation, satisfaction, waiver, or release of Purchaser’s payment obligations under this Agreement.
Notwithstanding the foregoing, in the event Purchaser enters into a Financing Agreement with the Financing Partner and the Financing Partner fails or refuses to disburse any portion of the purchase price to TK Elevator for any reason, including without limitation default by either party under the Financing Agreement, bankruptcy or insolvency of either party, or termination of the Financing Agreement for any reason any unpaid purchase price then owing by Purchaser which shall be payable immediately by Purchaser upon demand by TK Elevator in accordance with this Agreement.
Purchaser hereby waives any right of setoff, counterclaim, defense, or deduction against TK Elevator based on any act or omission of the Financing Partner. Purchaser further agrees that any assignment by TK Elevator to the Financing Partner of the right to receive payment hereunder shall not impair TK Elevator’s rights or remedies in the event of nonpayment. The obligations of Purchaser under this paragraph shall survive any termination, cancellation, or expiration of this Agreement.
Any work that Purchaser may require prior to turnover of the equipment that is outside of the scope described in this Proposal - other than Temporary Use as described below - will be performed only after the full execution of a mutually agreeable change order and only at the following rates:
Mechanic (Standard) per hour $450.06
Mechanic (OT) per hour $742.50
Team (Standard) per hour $810.10
Team (OT) per hour $1,335.66
Rates are not inclusive of any per diem, mileage or other expenses which may be dependent on jobsite location and are valid until 05-13-2027 .
03 Warranty
TK Elevator warrants any equipment it installs as described in this Proposal against defects in material and workmanship for a period of one (1) year from the date of Purchaser’s execution of TK Elevator's “Final Acceptance Form” on the express conditions that all payments made under this Proposal and any mutually agreed-to change orders have been made in full and that such equipment is currently being serviced by TK Elevator. In the event that TK Elevator's work is delayed for a period greater than six (6) months, the warranty shall be reduced by the amount of the delay. This warranty is in lieu of any other warranty or liability for defects. TK Elevator makes no warranty of merchantability and no warranties which extend beyond the description in this Proposal, nor are there any other warranties, expressed or implied, by operation of law or otherwise. Like any piece of fine machinery, the equipment described in this Proposal should be periodically inspected, lubricated, and adjusted by competent personnel. This warranty is not intended to supplant normal maintenance service and shall not be construed to mean that TK Elevator will provide free service for periodic examination, lubrication, or adjustment, nor will TK Elevator correct, without a charge, breakage, maladjustments, or other trouble arising from normal wear and tear or abuse, misuse, improper or inadequate maintenance, or any other causes other than defective material or workmanship. In order to make a warranty claim, Purchaser must give TK Elevator prompt written notice at the address listed on the cover page of this Proposal and provided all payments due under the terms of this Proposal and any mutually agreed to written change orders have been made in full, TK Elevator shall, at its own expense, correct any proven defect by repair or replacement. TK Elevator will not, under any circumstances, reimburse Purchaser for cost of work done by others, nor shall TK Elevator be responsible for the performance of any equipment that has been the subject of service, repair, replacement, revisions or alterations by others. The Purchaser agrees to provide us access to the elevator equipment at any reasonable time for the purpose of making good this warranty. Purchaser and/or Owner agree to maintain the confidentiality of the TK Elevator’s software that is licensed for the Owner’s use. The software will not be copied, modified, distributed, or reverse engineered. The software is licensed to the Purchaser and/or Owner exclusively for the location of installation, and the license will not transfer except as part of a transfer, assumption, or succession of ownership. If there is more than one (1) unit which is the subject of work described in this Proposal, this section shall apply separately to each unit as accepted.
04 Preventative Maintenance Program
This Proposal does not include any maintenance, service, repair or replacement of the equipment or any other work not expressly described herein. TK Elevator may submit a separate proposal to Purchaser covering the maintenance and repair of this equipment to be supplied to Purchaser at an additional cost. In the event the Purchaser and TK Elevator have a new or existing maintenance Agreement in effect at the time of the acceptance of this proposal and/or during the scope of this work, the terms of the Agreement shall remain in full force and effect throughout the performance of this scope of work and continue throughout the duration of the stated term in that Agreement.
05 TKE Digital
The cost of TK Elevator digital hardware is included in the price of this Proposal. Activation of the digital service package(s) listed below is contingent upon Purchaser's (or Owner's, as applicable) signed acceptance of a separate elevator maintenance agreement with TK Elevator which includes both pricing and scope for such digital service(s).
MAX
MAX is a cloud based Internet of Things (IoT) platform that we, at our election, may connect to your elevators by means of installing a remote-monitoring device or modem (each a “device”). MAX will analyze the unique signal output of your equipment 24/7 and when existing or potential outages are identified, MAX will automatically communicate with our dispatch centers. With an eligible MAX digital service, our dispatch center will alert our technicians through a generated service ticket during normal working hours. These MAX alerts provide the technician with precise diagnostics detail, which greatly enhances our ability to fix your equipment right the first time, MAXimizing the equipment uptime.
a. Purchaser authorizes TK Elevator and its employees to access purchaser’s premises to install, maintain and/or repair the devices and, upon termination of the service agreement, to remove the same from the premises if we elect to remove.
b. TK Elevator is and shall remain the sole owner of the devices and the data communicated to us by the devices. The devices shall not become fixtures and are intended to reside where they are installed. TK Elevator may remove the devices and cease all data collection and analysis at any time. c. If the service agreement between TK Elevator and Purchaser is terminated for any reason, TK Elevator will automatically deactivate the data collection, terminate the device software and all raw data previously received from the device will be removed and/or expunged or destroyed. d. Purchaser consents to the installation of the devices in your elevators and to the collection, maintenance, use, expungement and destruction of the daily elevator data as set forth in this agreement. e. The devices installed by TK Elevator contain trade secrets belonging to us and are installed for the use and benefit of our personnel only.
f. Purchaser agrees not to permit purchaser personnel or any third parties to use, access, tamper with, relocate, copy, disclose, alter, destroy, disassemble or reverse engineer the device while it is located on purchaser’s premises.
g. The installation of this equipment shall not confer any rights or operate as an assignment or license to you of any patents, copyrights or trade secrets with respect to the equipment and/or any software contained or imbedded therein or utilized in connection with the collection, monitoring and/or analysis of data.
06 Work Not Included
There are certain items that are not included in this Proposal, many of which must be completed by Purchaser prior to and as a condition precedent to TK Elevator's performance of its work as described in this Proposal. In order to ensure a successful completion of this project, it shall be solely Purchaser’s responsibility to coordinate its own completion of those items with TK Elevator. The following is a list of those items that are not included in this Proposal:
A. Hoistways and Equipment Rooms
• Purchaser shall provide the following
• A dry legal hoistway, properly framed and enclosed, and including a pit of proper depth and overhead. This is to include steel hoist beam, inspection or access platforms, access doors, sump pump, lights, waterproofing and venting as required; dewatering of pit(s) and required permanent screening. • A dry legal machine/control room, with clear rollable access adequate for the elevator equipment, including floors, trap doors, properly sized legal machine room doors, gratings, machine room or roof access platforms, roof/loading protection, ladders, railings, foundations, all hoist beams, lighting, ventilation sized per the TK Elevator shop drawings and/or code requirements. Purchaser must maintain machine/control room (or machine/control space within the shaft for MRL equipment) temperature between 55 and 90 degrees Fahrenheit, with relative humidity less than 95% non-condensing at all times. • Adequate bracing of entrance frames to prevent distortion during wall construction. • All grouting, fire caulking, cutting, x-ray and removal of walls and floors, patching, coring, setting of sleeves/knockouts, penetrations and painting (except as specified) and removal of obstructions required for elevator work; along with all proper trenching and backfilling for any underground piping and/or conduit. • All labor and materials necessary to support the full width of the hoistway at each landing for anchoring or welding TK Elevator sill supports, steel angles, sill recesses; • The furnishing, installing and maintaining of the required fire rating of elevator hoistway walls, including the penetration of firewall by elevator fixture boxes;
• Ensuring that the elevator hoistways and pits are dewatered, cleaned and properly waterproofed; • TK Elevator is not responsible for verifying field dimensions or related work by others. Purchaser must verify all dimensions on the submittal drawings prior to equipment fabrication.
B. Electrical and Life Safety:
• Purchaser shall provide a dedicated, analog telephone or data line to the elevator telephone or communication device; one additional data line per group of elevators for diagnostic capability wired to designated controller; • Purchaser shall provide:
• permanent 3-phase power with suitable connections from the power main to each controller and signal equipment feeders as required, including necessary circuit breakers and fused mainline disconnect switches per N.E.C. prior to installation. Permanent 3-phase power supply capable of operating the new elevator equipment under all conditions, no generator power, or manufactured power, will be acceptable; • piping and wiring to controller for mainline power, car lighting, and any other building systems that interface with the elevator controls per N.E.C. Articles 620-22 and 620-51; • any required hoistway / wellway, machine room, pit lighting and/or 110v GFCI service outlets; • conduit and wiring for remote panels to the Unit machine room(s) and between panels. Remote panels required by local jurisdictions are not included in this proposal;
• a bonded ground wire, properly sized, from the Unit controller(s) to the primary building ground; and all remote wiring to the outside alarm bell as requested by all applicable code provisions; • installed sprinklers, smoke/heat detectors on each floor, machine room and hoistways / wellways, shunt trip devices (not self-resetting) and access panels as may be required as well as normally open dry contacts for smoke/heat sensors, which shall be terminated by Purchaser at a properly marked terminal in the Unit controller; • a means to automatically disconnect the main line and the emergency power supply to the unit prior to the application of water in the Unit machine room that shall not be self-resetting; • emergency power supply including automatic time delay transfer switch and auxiliary contacts with wiring to the designated Unit controller and along with electrical cross connections between elevator machine rooms for emergency power purposes;
• the following emergency power provisions are not included: interface in controller, pre-testing and testing, emergency power keyswitches;
• emergency power operation is included as part of the design of the Unit control system and based on each car in the group only, to properly sequence, one at a time to the programmed landing, and park. The design requires that the generator, transfer switch, and related circuitry are sufficient to run this function or any other function for any building other system that is associated with this project. In the event that the generator, transfer switch, and related circuitry are not sufficient, TK Elevator will provide Purchaser with a written change order for Purchaser’s execution.
• a dry set of contacts which close 20 seconds prior to the transfer from normal power to emergency power or from emergency power to normal power whether in test mode or normal operating conditions in the event that an emergency power supply will be provided for the Unit;
• confirmation that the emergency standby power generator and/or building can accept the power generated to and from the Unit during both Hi-Speed and Deceleration. In cases where the generator and/or building load is not electrically sized to handle the power return from the regen drive, additional separate chopper and resistor units are available for purchase but not included in this proposal. The additional chopper and resistor units allow regenerated power to be dissipated in the resistor bank and not sent back into the building grid.
C. Miscellaneous:
• Purchaser shall provide all work relating to the finished flooring including, but not limited to, the provision of materials and its installation to comply with all applicable codes; • Purchaser is responsible for drilling of the mirror if required to install the new Hall Station in the lobby and 5th Floor Landing • Hydraulic jack replacement:
• the excavation of the elevator cylinder well hole in the event drilling is necessary through soil that is not free from rock, sand, water, building construction members and obstructions. Should obstructions be encountered, TK Elevator will proceed only after written authorization has been received from the Purchaser. The contract price shall be increased by the amount of additional labor at TK Elevator's standard labor rates as per the local office along with any additional expenses and materials required; • adequate ingress and egress, including ramping, for rail-mounted or truck-mounted drill rig; • Purchaser is responsible for pumping truck contractor to remove and dispose of spoils from the site. In the event that unforeseen and unfavorable below ground conditions are encountered, including but not limited to concrete around the cylinder, construction debris, adverse water and/or soil conditions, erosion, cavitations, oil contamination, or circumstances necessitating increased hole depth, etc., which require the employment of specialized contractors, TK Elevator shall immediately advise the Purchaser and costs will be extra to the contract; • in ground protection systems other than TK Elevator's standard HDPE or PVC protection system with bottomless corrugated steel casing;
• any required trenching and backfilling for underground piping or casings, and conduit as well as any compaction, grouting, and waterproofing of block-out;
• engineering, provision and installation of methane barriers or coordination/access; • access to 2" pressurized water supply within 100'-0" of the jack hole location; • a safe, accessible storage area for placement of D.O.T. 55 gallon containers for the purpose of spoils containment; obtaining of local environmental or disposal permits
• any spoils or water testing;
07 Working Hours, Logistics and Mobilization
• All work described in this Proposal shall be performed during TK Elevator's regular working days – defined as Monday thru Friday and excluding IUEC recognized holidays – and regular working hours – defined as those hours regularly worked by TK Elevator mechanics at the TK Elevator branch office that will provide labor associated with the performance of the work described in this Proposal - unless otherwise specified and agreed to in writing by both TK Elevator and Purchaser (hereinafter TK Elevator's regular working days and regular working hours shall be collectively defined as “normal working hours”). TK Elevator shall be provided with uninterrupted access to the Unit hoistway and machine room areas to perform work during normal working hours. • Purchaser shall provide on-site parking to all TK Elevator personnel at no additional cost to TK Elevator. • Purchaser shall provide traffic control, lane closures, permits and flagmen to allow suitable access/unload of tractor trailer(s).
• Purchaser agrees to provide unobstructed tractor-trailer access and roll-able access from the unloading area to the Unit hoistways or wellways (as applicable).
• Purchaser will be required to sign off on the Material Release Form, which will indicate the requested delivery date of equipment to the site. If Purchaser is not ready to accept delivery of the equipment within ten (10) business days of the agreed upon date, Purchaser will immediately make payments due for equipment and designate an area adjacent to the elevator shaft where Purchaser will accept delivery. If Purchaser fails to provide this location or a mutually agreeable alternative, TK Elevator is authorized to warehouse the equipment at the TK Elevator warehouse or designated distribution facility at Purchaser's risk and expense. Purchaser shall reimburse TK Elevator for all costs due to extra handling and warehousing. Storage beyond ten (10) business days will be assessed at a rate of $125.00 per calendar day for each unit listed in this Proposal, which covers storage and insurance of the elevator equipment and is payable every (30) calendar days.
• Purchaser agrees to provide a dry and secure area adjacent to the hoistway(s) at the ground level for storage of the Unit equipment and tools within ten (10) business days from receipt at the local TK Elevator warehouse. Any warranties provided by TK Elevator for vertical transportation equipment will become null and void if equipment is stored in any manner other than a dry, climate controlled enclosed building structure. Any relocation of the equipment as directed by Purchaser after initial delivery will be at Purchaser's expense. • You agree that if you are not ready to permit us to begin the installation of the equipment when we notify you when all or part of it is ready for shipment, you will immediately pay us a sum equal to the amount which would be payable to us if the elevator equipment or such part of it had actually been shipped and delivered. Unless you promptly provide to us a secure and convenient storage area, we are authorized to warehouse the elevator(s) at your risk and in any event, you shall reimburse us for all costs due to extra handling and warehousing. • TK Elevator includes one mobilization to the jobsite. A mobilization fee of $5,000.00 (minimum) per crew per occurrence will be charged for pulling off the job or for any delays caused by others once material has been delivered and TK Elevator's work has commenced.
• Access for this project shall be free and clear of any obstructions. A forklift for unloading and staging material shall also be provided by Purchaser at no additional cost.
• Purchaser shall provide an on-site dumpster. TK Elevator will be responsible for cleanup of Unit packaging material; however, composite cleanup participation is not included in this Proposal. • The hiring of a disposal company which MUST be discussed prior to any material being ordered or work being scheduled. TK Elevator will provide environmental services ONLY if this is specifically included under the "Scope of Work" section above. TK Elevator assumes no responsibility and/or liability in any way whatsoever for spoils or other contamination that may be present as a result of the cylinder breach and/or other conditions present on the work site.
• One or more of the units described in this Proposal will be out of service and unavailable to move passengers and/or property during entire duration of the performance of the work described in this Proposal until re-certified by the applicable authority(ies) having jurisdiction and in good standing with payment schedules. • If site specific rules and regulations classify the elevator pit as confined space, elevator pits will need to reclassify a permit-required space to a non-permit required space prior to mobilization.
08 Temporary Use, Inspection and Turnover
• Unless required by specification, TK Elevator will not provide for “temporary use” of the Unit(s) described in this Proposal prior to completion and acceptance of the complete installation. Temporary use shall be agreed to via a change order to this Proposal which shall require Purchaser’s execution of TK Elevator's standard Temporary Use Agreement. All labor, parts, repairs, adjustments, and/or refurbishment including callbacks required during the temporary use period will be billed at TK Elevator's billing rates listed in this proposal or TK Elevator's local service billing rates.
• Cost for temporary use of a Unit shall be $200.00 per calendar day per hydraulic elevator and $250.00 per calendar day for each traction elevator for rental use only (minimum rental period is 30 calendar days), excluding personnel to operate.
• In the event that a Unit must be provided for temporary use, TK Elevator will require 30 days to perform final adjustments and re-inspection after the elevator has been returned to TK Elevator with all protection, intercoms and temporary signage removed. This duration does not include any provisions for finish work or for repairs of same, which shall be addressed on a project-by-project basis. • Cost for preparation of controls for temporary use, refurbishment due to normal wear and tear, readjustment and re-inspection is $5,000.00 per Unit up to 10 floors in addition to costs for replacement or refurbishment of equipment based on special circumstances. For projects above 10 stops, an additional cost of $1,500.00 / 10 floors shall apply.
• These costs are based on work performed during normal working hours. Temporary use excludes vandalism or misuse. Any required signage, communication devices, elevator operators, and protection are not included while temporary use is being provided. All overtime premiums for repairs during the temporary use period will be billed at the billing rates listed in this proposal or TK Elevator's local service billing rates. • The Proposal price set forth above includes one (1) inspection per Unit by the applicable authority having jurisdiction and/or third party inspectors where the equipment is located. In the event the equipment fails that inspection due to no fault of TK Elevator, TK Elevator will charge Purchaser for both the entire cost of each re-inspection which shall be $1,500.00 per Unit and a remobilization fee which shall be $5,000.00 per Unit, plus any additional costs that may apply, via change order prior to scheduling a re-inspection. In the event the inspection fails due to items caused by both parties, the aforementioned fees will be prorated based on the number of items by each party. • Upon notice from TK Elevator that the installation and/or modernization of the equipment is complete, Purchaser will arrange to have present at the jobsite a person authorized to make the final inspection and to execute TK Elevator's “Final Acceptance Form“ prior to turnover of each Unit. The date and time that such person will be present at the site shall be mutually agreed upon but shall not be more than ten (10) business days after the date of TK Elevator's notice of completion to Purchaser unless both TK Elevator and Purchaser agree to an extension of that ten (10) day period in writing. Such final inspection and execution of TK Elevator's “Final Acceptance Form” shall not be unreasonably delayed or withheld.
• Should the Purchaser or the local authority having jurisdiction require TK Elevator's presence at the inspection of equipment installed by others in conjunction with the work described in this Proposal, Purchaser agrees to compensate TK Elevator for its time at TK Elevator's billing rates as shown in this proposal. • At the conclusion of its work, TK Elevator will remove all equipment and unused or removed materials from the project site and leave its work area in a condition that, in TK Elevator's sole opinion, is neat and clean. • Purchaser agrees to accept a live demonstration of equipment’s owner-controlled features on the same day as the turnover of each unit in lieu of any maintenance training required in the bid specifications. • Purchaser agrees to accept TK Elevator's standard owner’s manual in lieu of any maintenance, or any other, manual(s) required in the bid specifications. Any additional electronic copies or hard copies required will be subject to an additional charge of $275.00. No program source coding, printed circuit board schematics, diagnostic hardware or codes will be provided.
• Should use of equipment be required prior to substantial completion, the Purchaser agrees to the signing of an interim maintenance agreement as outlined in Section 04. Any repairs, re-balancing, and cleaning as a result of interim use to restore equipment to as new condition will be extra to the Proposal.
09 Additional Terms and Conditions
a. In no event shall TK Elevator be responsible for liquidated, consequential, indirect, incidental, exemplary, and special damages associated with the work described in this Proposal. b. This Proposal is made without regard to compliance with any special purchasing, manufacturing or construction/installation requirements including, but not limited to, any socio-economic programs, such as small business programs, minority or woman owned business enterprise programs, or local preferences, any restrictive sourcing programs, such as Buy American Act, or any other similar local, state or federal procurement regulations or laws that would affect the cost of performance. Should any such requirements be applicable to the work described in this Proposal, TK Elevator reserves the right to modify this Proposal or rescind it altogether. c. TK Elevator is an equal opportunity employer.
d. TK Elevator's performance of the work described in this Proposal is contingent upon Purchaser furnishing TK Elevator with any and all necessary permission or priority required under the terms and conditions of government regulations affecting the acceptance of this Proposal or the manufacture, delivery or installation of the equipment. All applicable sales and use taxes, permit fees and licenses imposed upon TK Elevator as of the date of the Proposal are included in the price of the Proposal. Purchaser is responsible for any additional applicable sales and use taxes, permit fees and licenses imposed upon TK Elevator after the date of the Proposal or as a result of any law enacted after the date of the Proposal. e. The price of this Proposal includes value added taxes, tariffs, duties, and/or similar charges that are in effect as of the date of this Proposal. Purchaser is responsible to pay TK Elevator any and all additional amounts for the materials and/or components described in this Proposal above and beyond the pricing set forth in this Proposal for the reasons set forth in any of the following three (3) categories along with profit and overhead: (1) value added taxes, tariffs, duties, and/or other charges imposed by applicable governmental authorities that are in effect when such materials and/or components are ready to ship; (2) additional or increased charges to TK Elevator from any of the material and/or component suppliers after the date of this Proposal; and/or (3) additional or increased charges to TK Elevator from its shippers and/or freight forwarders of such materials and/or components after the date of this Proposal. When the materials and/or components called for in this Proposal are ready to ship, if required TK Elevator will provide Purchaser with a change order(s) covering all additional amounts mentioned in the preceding sentence which must be executed and fully paid for prior to and as a condition precedent to delivery of those materials and/or components to the jobsite or to the provision of any labor on the project.
f. Purchaser agrees to provide TK Elevator's personnel with a safe place in which to work and TK Elevator reserves the right to discontinue work at the jobsite whenever, in TK Elevator's sole opinion, this provision is being violated.
g. The pricing set forth in this Proposal assumes that the elevator pits will not be classified as a confined space.
TK Elevator will follow its standard safety policy and procedures. Any job specific safety requirements over and above TK Elevator's standard practices and policies may require additional costs. h. TK Elevator will furnish and install all equipment in accordance with the terms, conditions, scope and equipment nomenclature as noted herein. Requested changes or modifications to such provisions will require a written change order issued on the Purchaser’s letterhead and accepted by TK Elevator in writing prior to the execution of such work. This change order shall detail the current Proposal price, the amount of the change, and new Proposal value.
i. This Proposal does not include a schedule for the work described and any such schedule shall be mutually agreed upon by an authorized representative of both TK Elevator and Purchaser in writing before becoming effective.
j. In the event asbestos material is knowingly or unknowingly removed or disturbed in any manner at the jobsite, Purchaser shall monitor TK Elevator's work place and prior to and during TK Elevator's manning of the job, Purchaser shall certify that asbestos in the environment does not exceed .01 fibers per cc as tested by NIOSH 7400. In the event TK Elevator's employees or those of TK Elevator's subcontractors are exposed to an asbestos hazard, PCP’s, lead or other hazardous substances, Purchaser agrees, to the fullest extent permitted by law, to indemnify, defend, and hold TK Elevator harmless from all damages, claims, suits, expenses, and payments resulting from such exposure. Identification, notification, removal and disposal of asbestos containing material, PCP’s lead or other hazardous substances are the responsibility of the Purchaser. k. TK Elevator retains title to and a security interest in all equipment it supplies – which TK Elevator and Purchaser agree can be removed without material injury to the real property – until all payments including deferred payments and any extensions thereof, are made. In the event of any default by Purchaser on any payment, or any other provision of this Proposal, TK Elevator may take immediate possession of the equipment and enter upon the premises where it is located – without legal process – and remove such equipment or portions thereof, irrespective of the matter of its attachment to the real estate or the sale, mortgage or lease of the real estate. Pursuant to the Uniform Commercial Code, and at TK Elevator's request, Purchaser agrees to execute any financial or continuation statements which may be necessary for TK Elevator to file in public offices in order to perfect TK Elevator's security interest in such equipment. l. TK Elevator reserves the right to assign payments owed to TK Elevator under this Proposal. m. TK Elevator shall not be liable for any loss, damage or delay caused by acts of government, labor troubles, strikes, lockouts, fire, explosion, theft, floods, riot, civil commotion, war, malicious mischief, acts of God or any cause beyond its control.
n. The rights of TK Elevator under this Proposal shall be cumulative and the failure on the part of the TK Elevator to exercise any rights hereunder shall not operate to forfeit or waive any of said rights. Any extension, indulgence or change by TK Elevator in the method, mode or manner or payment or any of its other rights shall not be construed as a waiver of any of its rights under this Proposal. o. In the event TK Elevator engages a third party to enforce the terms of this Proposal, and/or to collect payment due hereunder, either with or without suit, Purchaser agrees to pay all costs thereof together with reasonable attorney’s fees. Purchaser does hereby waive trial by jury and does hereby consent to the venue of any proceeding or lawsuit under this Proposal to be in the county where the work covered by this Proposal is located. p. TK Elevator can furnish Certificate of Workers’ Compensation, Bodily Injury and Property Damage Liability Insurance coverage to Purchaser upon written request.
q. Should loss of or damage to TK Elevator's material, tools or work occur at the project site, Purchaser shall compensate TK Elevator for such loss, unless such loss or damage results from TK Elevator's own acts or omissions.
r. Purchaser, in consideration of TK Elevator performing the services set forth in this Proposal, to the fullest extent permitted by law expressly agrees to indemnify, defend, save harmless, discharge, release and forever acquit TK Elevator Corporation, TK Elevator Manufacturing, Inc., their respective employees, officers, agents, insurers, affiliates, and subsidiaries (hereinafter singularly a “TK Elevator party“ and collectively the “TK Elevator parties“) from and against any and all claims, demands, suits, and proceedings for loss, property damage (including damage to the equipment which is the subject matter of this Proposal), personal injury or death that are alleged to either have arisen out of or be connected with the sale, marketing, presence, use, misuse, maintenance, installation, removal, modernization, manufacture, design, operation or condition of the equipment that is the subject matter of this Proposal or the labor and materials furnished in connection with this Proposal. Purchaser’s duty to indemnify a TK Elevator party does not apply to the extent that the loss, property damage (including damage to the equipment which is the subject matter of this Proposal), personal injury or death is determined to be caused by or resulting from the negligence of that TK Elevator party. Purchaser recognizes that its obligation to defend the TK Elevator parties under this clause, which is separate and apart from its duty to indemnify the TK Elevator parties, includes payment of all attorneys’ fees, court costs, judgments, settlements, interest and any other expenses of litigation arising out of such claims, demands, suits or proceedings.
s. Purchaser further expressly agrees to name TK Elevator parties along with their respective officers, agents, affiliates and subsidiaries as additional insureds in Purchaser’s liability and any excess (umbrella) liability insurance policy(ies). Such insurance must insure TK Elevator parties for those claims and/or losses referenced in the above paragraph and those claims and/or or losses arising from the negligence of TK Elevator parties. Such insurance must specify that its coverage is primary and non-contributory. Purchaser hereby waives its right of subrogation.
t. TK Elevator's participation in any controlled insurance program is expressly conditioned upon review and approval of all controlled insurance program information and documentation prior to enrollment. Any insurance credits if applicable, will be provided at that time.
u. Unless so mutually agreed upon in a separate signed agreement, TK Elevator shall not be required to interact or correspond with any third party with whom Subcontractor is not in privity of contract concerning matters pertinent to this Agreement.
v. The Purchaser must inform TK Elevator if Purchaser is, or becomes, an individual or entity that is - or that is majority owned or controlled by a party that is - included on any list of restricted parties maintained by (i) the United States of America; (ii) Canada; (iii) the European Union or any EU member state; (iv) the UK; (v) the United Nations; or (vi) any other national authority binding the parties of this contract.
In case the Purchaser, or any other beneficiary of this transaction, e.g. the end-user, is or becomes an individual or entity that is - or that is majority owned or controlled by a party that is - included on any list of restricted parties, TK Elevator reserves the right to cancel this Proposal immediately.
If the goods subject to this Proposal would be exported, re-exported, resold, used, transferred or otherwise disposed of in violation of any sanctions applicable to TK Elevator, TK Elevator also reserves the right to cancel this Proposal immediately. In this respect, the Purchaser shall be obliged to disclose the final delivery address, end-user and end-use of the goods upon request - insofar as legally permissible - and to notify TK Elevator of all circumstances that indicate an aforementioned infringement. "Sanctions" means here any economic, trade or financial sanctions, laws, regulations, embargoes or restrictive measures imposed, enacted, administered or enforced by any Sanctions Authority. "Sanctions Authority" means (i) the United States of America; (ii) Canada; (iii) the European Union or any EU member state; (iv) the UK; (v) the UN Security Council; or(vi) any governmental institutions of any of the foregoing which administer Sanctions, including HM Treasury, OFAC, Global Affairs Canada and The Department of Treasury Board and Finance, the US State Department and the US Department of the Treasury.
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 1
City Hall North & Dignity Health Arena -Aug2026 August 11, 2026 Purchaser: City Of Bakersfield Projects
Location:
City Hall North Dignity Health Arena
Address: 1601 Truxtun Ave Address: 1601 Truxtun Ave 1001 Truxtun Ave Bakersfield, CA 93309 Bakersfield, CA Bakersfield, CA
TK Elevator Corporation (hereinafter "TK Elevator") is dedicated to delivering City Of Bakersfield (hereinafter “Purchaser”) the safest, highest quality vertical transportation solutions. I am pleased to present this customized Proposal (the “Proposal”) in the amount of $1,675,000.00 inclusive of all applicable sales and use taxes to modernize the elevator equipment described in the pages that follow at the above-referenced location.
Our modernization package is engineered specifically for your elevator system and will include the elevator mechanical and electrical components being replaced, refurbished or retained.
The price above includes those value added taxes, tariffs, duties, and/or similar charges that are in effect as of the date of this proposal. The price of this Proposal is subject to escalation - even after Purchaser’s acceptance of this Proposal - under certain circumstances including any new or increase in taxes, tariffs, or other charges imposed by applicable governmental authorities and/or TK Elevator being subjected to increased charges by its suppliers, shippers and/or freight forwarders as set forth in the terms and conditions in this Proposal.
Furthermore, all preparatory work by other trades must be completed and elevator equipment shipped by 10-23- 2026 and the installation must be completed by 05-13-2027, otherwise, the price is also subject to increase.
If not accepted within twenty-one (21) calendar days of the date of this Proposal or the date presented to Purchaser, this Proposal shall automatically be revoked and shall be null and void.
In the event you have any questions regarding the content of this Proposal please contact me at +1 916 813-9668 We appreciate your consideration.
Regards,
Steve Boisvert
Steve Boisvert, [email protected] | +1 916 813-9668 TK Elevator Corporation, 940 Riverside Pkwy Ste 20, W. Sacramento, CA 95605
EXHIBIT A
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 2
SCOPE OF WORK
Building : City Hall North
1600 Truxtun Ave
Groups Included
Group Name # of units Equipment Type
Group 1 Passenger 2x units - Traction – 6 Stop
Building : Arena
1600 Truxtun Ave
Groups Included
Group Name # of units Equipment Type
Group 1 Passenger 1x Unit - Hydraulic – 3 Stops
Group 2 Freight 1x Unit - Hydraulic – 3 Stops
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 3
Description of Work - City Hall North
Controller
Item Description Option Installed On
TAC 32T Controller (Includes Options listed below)
• 24 VDC Signal Voltage
• Electronic Door Detector Interface
New Car 1,Car 2
eMax Monitoring Device Provisions New Group 1
Machine Room Wiring Package New Car 1,Car 2
tkE Green Drive 400E (2109CD006) VVVF AC Drive / Regenerative 60R New Car 1,Car 2 Emergency Power (10-D-4A) New Car 1,Car 2
Seismic Operation / Counterweight Derailment New Car 1,Car 2 Tenant Security 3-1 (Card Reader) New Car 1,Car 2
Encoder Board for Motors by Others (part no. 546AV11) New Car 1,Car 2 Shaker Box (For Group) New Group 1
Auto Fan Light Shutdown (Sleep Mode) New Car 1,Car 2
Fire Service New Car 1,Car 2
Hall Lanterns New Car 1,Car 2
Hoistway Access New Car 1,Car 2
Door Operator Controls New Car 1,Car 2
Group Operation New Car 1,Car 2
Loadweigher Controls New Car 1,Car 2
User Interface Tool New Car 1,Car 2
Hoistway Enable/Inspection Operation New Car 1,Car 2
Independent Service New Car 1,Car 2
Governor
Item Description Option Installed On
Retain Governor Retain Car 1,Car 2
Car
Item Description Option Installed On
Retain Safeties Retain Car 1,Car 2
Crosshead data tag (for existing car slings) New Car 1,Car 2 tkE Cable Strain Loadweigher (for 5 ropes) New Car 1,Car 2 Fan: Two Speed New Car 1,Car 2
Fan Grill Standard New Car 1,Car 2
Toe Guard for 2000 code (48") New Car 1,Car 2
Car Guides Wheels Replacement New Car 1,Car 2
Cab Wiring Material (200MK1) New Car 1,Car 2
5 Pin Lock with electric contact for Car Top Exit New Car 1,Car 2 Car Top Railing New Car 1,Car 2
Hoistway Door Equipment
Item Description Option Installed On
Retain Hoistway Doors Retain Car 1,Car 2
Hanger Rollers New Car 1,Car 2
Interlock / Pick up Assemblies for existing Dover Operators. Includes closers. (Front) New Car 1,Car 2 Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 4
Machine
Item Description Option Installed On
Deflector/Secondary Sheave New Car 1,Car 2
New Machine New Car 1,Car 2
Ascending Motion (Rope Gripper or other) New Car 1,Car 2 Rope Retainers New Car 1,Car 2
Hoist Cables, traction steel, preformed New Car 1,Car 2 Car/Cwt shackles w/springs (pairs per 1/2" or 5/8" rope) New Car 1,Car 2 Cab
Item Description Option Installed On
Cab Interior via Allowance of $35,000 per Elevator (Total $70,000) Allowance Car 1,Car 2 Retain Cab Flooring Retain Car 1,Car 2
Car Door (SSCO, #4 Muntz) New Car 1,Car 2
Pit Equipment
Item Description Option Installed On
Buffer Oil New Car 1,Car 2
Counterweight Derailment detector (ring and string) New Car 1,Car 2 Pit Stop Switch New Car 1,Car 2
Counterweight Guides Wheels Replacement New Car 1,Car 2 Hoistway Equipment
Item Description Option Installed On
TAC 32T Field Friendly Wiring Package:
• Includes single flat traveling cable with coax
• hoistway wiring
• interlock wiring
• interlock connectors
• discrete wiring
• FIBER OPTIC CABLE, HOISTWAY PIPING & DUCT ARE NOT INCLUDED.
New Car 1,Car 2
APS (Absolute Positioning System) for TAC32T with Final Limit Switches New Car 1,Car 2 Screening New Group 1
Car Door Equipment
Item Description Option Installed On
Micro Light (Front) New Car 1,Car 2
LD-16 Plus Door Operator with Complete carside equipment (FRONT) • includes Adapter kit (Tracks & Hangars), Clutch (w/ Car Door Lock latch & contact), & Car Top Inspection station (w/ alarm signal and Flooded Pit Jewel) New Car 1,Car 2
Car Fixtures
Item Description Option Installed On
Main Car Station Includes Options Below New Car 1,Car 2 • Column Type Swing Return for New/Existing Dover/tkE Cabs) New Car 1,Car 2 Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 5
Item Description Option Installed On
Vandal Resistant Floor Buttons New Car 1,Car 2
Cast Braille Plates for Car Features New Car 1,Car 2
Standard Key Switch Package
• Fan
• Light
• Independent
• Stop
• Inspection/Hoistway Enable)
New Car 1,Car 2
Emergency Light mounted in COP New Car 1,Car 2
2004 and later Fire Service Phase II Features (includes instructions signage) New Car 1,Car 2 Handicap Signal (Passing signal) New Car 1,Car 2
Position Indicator (2" CE Segmented) New Car 1,Car 2
ADA Phone System integral with COP (Rath) New Car 1,Car 2 Speaker Pattern for Intercom System/ADA Phone New Car 1,Car 2 Locked Service Cabinet New Car 1,Car 2
Certificate Window New Car 1,Car 2
#4 Muntz Bronze Finish New Car 1,Car 2
Bar Style Button New Car 1,Car 2
Seismic Operation Jewel New Car 1,Car 2
Card Reader Provisions (Space only) New Car 1,Car 2
Voice Annunciator (mounted in COP)
• Standard features only
• additional costs apply for custom features
New Car 1,Car 2
Smart Rescue Phone 5 Standalone New City Hall North
Hall Fixtures
Item Description Option Installed On
Terminal Hall Stations (Surface Mounted) with
• Appendix O (Polycarbonate insert flame)
• Fusion (#4 Muntz)
New Group 1
Fire Service Phase I Key Switch and Signage (Plastic) New Group 1 Car Identification Plate (Pair) New Car 1,Car 2
Hoistway Jamb Braille (Pair of Standard) (# of Floors) New Car 1,Car 2 Hall Lantern and Chime (#4 Muntz) New Car 1,Car 2
Horizontal Combination Hall Lantern and 2" Digital Hall Position Indicator (#4 Muntz) New Car 1,Car 2 Standalone Hoistway Access Station #4 Muntz New Car 1,Car 2 Standalone Emergency Power Keyswitch with Jewel #4 S/S (441) New Group 1 Hall Call Lockout Keyswitch New Group 1
Clarifications to Architectural Plans and Specifications:
• For the Update Electrical and Fire Life Safety, this proposal includes Update to Electrical and Fire Life Safety. See Appendix #1 for details of Scope of Work provided. Any deviation will be handled via Change Order. • Logistical Plan:TK Elevator will remove existing equipment and bring new equipment to the roof by using a total of two crane picks. This proposal includes an allowance of $16,000 ($8,000per elevator) for craning. Some equipment will also be delivered via the loading dock. Purchaser is responsible to shall ensure that clear, unobstructed access by and between the machine room, elevators, storage areas, work areas, etc. for the duration of the project. Any required deviation from the stated logistical plan will be submitted as a change order to the project agreement.
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 6
• TK Elevator's proposal pricing includes regenerative drive technology. In the event that the building electrical systems, including generator, are not capable of receiving the power, any required modification to the elevator design it will be provided through the Change Order process.
• For elevator modernization projects, each elevator cab will be weighed prior to the start of the modernization process of each individual unit. If the existing cabs are over 5% of the allowable weight and contracted capacity as noted on the original crosshead data tag and/or the elevators are out of balance, any additional scope of work to make code compliant will be determined on an elevator by elevator case basis and a change order for this work will be proposed accordingly. In addition, TK Elevator will not be responsible for any building structural items due to elevator exceeding the 5% allowable weight nor the under-sizing of the equipment proposed using the crosshead data tag information. Should additional or higher-rated equipment be required due to a discrepancy in the actual vs. car top crosshead data tag, additional cost may apply and will be provided via change order.
The rails, shall be retained. If any work is required on retained equipment, a change order will be provided detailing additional required scope and pricing.
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 7
Appendix #1 – Electrical City Hall North
Modernization Proposal
2026-4-59881 | ACIA-2ECR4GH | August 11, 2026 8
Appendix #1 – Fire Life Safety City Hall North
Description of Work - Dignity Health Arena
Controller
Item Description Option Installed On
TAC 32H Controller (Includes Options listed below)
• 24 VDC Signal Voltage
• Electronic Door Detector Interface
New Pass #1,Freight 1
eMax Monitoring Device Provisions New Group 1,Group 2
Solid State Starters (6 or 12 leads) 460 / 575 VAC New Freight 1,Pass #1 Emergency Power (10-D-4A) New Pass #1,Freight 1
Power Freight Doors (TAC32):
• Peele (2775, 2776, 2742)
New Freight 1
Rear Door Operation New Freight 1
SAPB New Freight 1
Seismic Features New Pass #1,Freight 1
Viscosity Control (Required over 150 FPM) New Pass #1,Freight 1 THY Board / CE Driver Board New Pass #1,Freight 1
Position Indicator New Pass #1,Freight 1
Auto Fan Light Shutdown (Sleep Mode) New Pass #1,Freight 1 Fire Service New Pass #1,Freight 1
Hall Lanterns New Pass #1
Hoistway Access New Pass #1,Freight 1
Door Operator Controls New Pass #1,Freight 1
User Interface Tool New Pass #1,Freight 1
Hoistway Enable/Inspection Operation New Pass #1,Freight 1 Independent Service New Pass #1,Freight 1
Jack
Item Description Option Installed On
Retain Jack Retain Pass #1,Freight 1
Pipe Stands New Pass #1,Freight 1
Packing New Pass #1,Freight 1
Hoistway Door Equipment
Item Description Option Installed On
Retain Hoistway Doors & Bi-Parting Doors Retain Pass #1,Freight 1 Interlock / Pick Up Rollers / Closer / Gibs New Pass #1 Hanger Rollers New Pass #1,Freight 1
New Motors and Hardware for retained Hoistway doors New Freight 1 Cab
Item Description Option Installed On
Retain Cab Interior Retain Freight 1
Retain Cab Flooring Retain Pass #1,Freight 1
SnapCab Modern I Wall Panels - 3 Walls & & Frame Ceiling, Translucent Diffusers and LED Tube, Handrail
New Pass #1
Car Door (SSSS, #4 S/S (441)) New Pass #1
Power Freight Gates, New Motors & Hardware & Door Detector New Freight 1 Power Unit
Item Description Option Installed On
Power Unit New Pass #1, Freight 1
Viscosity Control (Required over 150 FPM) New Pass #1
Seismic Requirements for AP units New Pass #1
Overspeed Valve Kits for 3" (over 150 GPM) New Pass #1,Freight 1 Oil New Pass #1,Freight 1
3" Shutoff Valve Kit (Pump) New Pass #1,Freight 1
Pit Equipment
Item Description Option Installed On
3" Shutoff Valve Kit (Pit) New Pass #1,Freight 1
Pit Stop Switch New Pass #1,Freight 1
Hoistway Equipment
Item Description Option Installed On
TAC 32 Field Friendly Wiring Package:
• Includes single traveling cable
• hoistway wiring
• interlock wiring
• interlock connectors
• serial wiring
• FIBER OPTIC CABLE, HOISTWAY PIPING & DUCT ARE NOT INCLUDED.
New Pass #1,Freight 1
Steel Tape with Mounting hardware, Selector and magnets (terminal limits included) New Pass #1,Freight 1 HN Boxes (per each 2 cars, grouped) New Pass #1,Freight 1 Car
Item Description Option Installed On
Car Top Inspection Station (Stand Alone) New Freight 1
Fan: Two Speed New Pass #1
Fan Grill Standard New Pass #1
21" Toe guard New Pass #1,Freight 1
Car Guides New Pass #1,Freight 1
Cab Wiring Material New Pass #1,Freight 1
5 Pin Lock with electric contact for Car Top Exit New Pass #1,Freight 1 Car Door Equipment
Item Description Option Installed On
Micro Light (Front) New Pass #1
LD-16 Plus Door Operator with Complete carside equipment (FRONT) • includes Adapter kit (Tracks & Hangars), Clutch (w/ Car Door Lock latch & contact), & Car Top Inspection station (w/ alarm signal and Flooded Pit Jewel) New Pass #1
Door Controller New Freight 1
Retiring Cam New Freight 1
Car Fixtures
Item Description Option Installed On
Main Car Station (COP) New Pass #1,Freight 1
Car Lantern New Pass #1
Hall Fixtures
Item Description Option Installed On
Hall Stations Terminal New Group 1,Group 2
Hall Stations Intermediate New Group 1,Group 2
Hoistway Access New Pass #1,Freight 1
Car Identification Plate (Pair) New Pass #1,Freight 1
Jamb Braille (Pairs) New Pass #1,Freight 1
Combo Hall Lantern/PI New Pass #1
Emergency Power Jewel New Group 1,Group 2
Fire Service Plastic Signage and Keyswitch New Group 1
Clarifications to Architectural Plans and Specifications:
• For the Update Electrical and Fire Life Safety, this proposal includes Update to Electrical and Fire Life Safety. See Appendix #2 for details of Scope of Work provided. Any deviation will be handled via Change Order. • For the elevator that is far from the equipment room, TKE assumes that the existing conduits (oil and electrical) can be reused. It is also assumed the existing junction boxes in the ceiling are accessible without removing part of the ceiling. Any work need on the ceiling is the responsibility of the purchaser. • For elevator modernization projects, each elevator cab will be weighed (pressure reading) prior to the start of the modernization process of each individual unit. If the existing cabs are over 5% of the allowable weight and contracted capacity as noted on the original crosshead data tag and/or the elevators are out of balance, any additional scope of work to make code compliant will be determined on an elevator by elevator case basis and a change order for this work will be proposed accordingly. In addition, TK Elevator will not be responsible for any building structural items due to elevator exceeding the 5% allowable weight nor the under-sizing of the equipment proposed using the crosshead data tag information. Should additional or higher-rated equipment be required due to a discrepancy in the actual vs. car top crosshead data tag, additional cost may apply and will be provided via change order. • The rails, shall be retained. If any work is required on retained equipment, a change order will be provided detailing additional required scope and pricing.
Appendix #2 – Electrical Dignity Health Arena
Appendix #2 – Fire Life Safety Dignity Health Arena
01 Key Tasks and Approximate Lead Times
Approximate Durations/Lead Times – City Hall North
Contract execution
(can run concurrently with layout drawing package preparation and approval) TBD by Purchaser
Survey and Order of Materials
(additional time required for cab, signal, entrance preparation and approval, if applicable) 10 Weeks
Fabrication time
(from receipt of all approvals, fully executed contract, Material Release Form* and initial progress payment) 15 Weeks
Shipping:
(Tennessee to local distribution center)
2 Weeks
Crew Scheduling: Varies
Modernization of elevator system (Per Unit):
(Upon completion of all required preparatory work by others and the signed pre-installation checklist) 13 - 15 Weeks
.
Approximate Durations/Lead Times – Dignity Health Arena Contract execution
(can run concurrently with layout drawing package preparation and approval) TBD by Purchaser
Survey and Order of Materials
(additional time required for cab, signal, entrance preparation and approval, if applicable) 2 - 6 Weeks
Fabrication time
(from receipt of all approvals, fully executed contract, Material Release Form* and initial progress payment) 11 Weeks
Shipping:
(Tennessee to local distribution center)
2 Weeks
Crew Scheduling: Varies
Modernization of elevator system (Per Unit):
(Upon completion of all required preparatory work by others and the signed pre-installation checklist) 6 - 10 Weeks
*If equipment is delivered to TKE’s staging facility in accordance with the date shown on the TKE Material Release Form, and the preparatory work required by other trades is not completed, all storage charges as a result of site delays are to be paid by the Purchaser based on the storage rates noted below in this proposal.
The durations or lead times listed above are strictly approximations that can vary due to factors both within and outside of TK Elevator's control, are subject to change without notice to Purchaser and shall not be binding on TK Elevator.
02 Payment of Work
50% of the price set forth in this Proposal as modified by options selected from the section entitled “Value Engineering Opportunities & Alternates” (if applicable) will be due and payable as an initial progress payment within 30 days from TK Elevator's receipt of a fully executed copy of this Proposal. This initial progress payment will be applied to project management, permits, engineering and shop drawings, submittals, drilling mobilizations (if required) and raw material procurement. Material will be ordered once this payment is received and the parties have both executed this Proposal and the Material Release Form. 25% of the price set forth in this Proposal as modified by options selected from the section entitled “Value Engineering Opportunities & Alternates” (if applicable) shall be due and payable when the material described above has been furnished. Material is considered furnished when it has been received at the jobsite or TK Elevator staging facility. Supporting documentation of materials stored shall be limited to stored materials certificates of insurance and bills of lading. Pictures will not be provided. Receipt of this payment is required prior to mobilization of labor. 25% of the price set forth in this Proposal shall be made as progress payments throughout the life of the project. In the event TK Elevator fails to receive payment within thirty (30) days of the date of a corresponding invoice, TK Elevator reserves the right to demobilize until such a time that the payments have been brought up to date, and TK Elevator has the available manpower.
It is agreed that there will be no withholding of retainage from any billing and by the customer from any payment.
The payment terms breakdown above shall be considered the Schedule of Values for the project as written. Billing shall be submitted on or before the 25th day of the month according to the payment schedule above and accompanied by a form of G702-703 pay application/schedule of values and a conditional waiver, the format of which is hereby acknowledged and accepted.
The use of online Portals for the submission of billing shall follow the terms of the Proposal and Purchaser agrees to permit billing in accordance with the executed contract terms. Portal access and usage is to be provided free of additional charge to TK Elevator and any additional cost for such use is to be reimbursed to TK Elevator via a reimbursable change order immediately upon acceptance.
Purchaser agrees that TK Elevator shall have no obligation to complete any steps necessary to provide Purchaser with full use and operation of the installed equipment until such time as TK Elevator has been paid 100% both of the price reflected in this Proposal and for any other work performed by TK Elevator or its subcontractors in furtherance of this Proposal. Purchaser agrees to waive any and all claims to the turnover and/or use of that equipment until such time as those amounts are paid in full.
Proposal price: $1,666,000.00
Initial progress payment: (50%) $833,000.00
Material furnished: (25%) $416,500.00
Total of remaining progress
payments:
(25%) $416,500.00
Bonds: $9,000.00
Estimated contract price: $1,675,000.00
Purchaser may elect to finance all or a portion of the purchase price for the work described in this Agreement through TK Elevator’s financing partner (“Financing Partner”), subject to the Financing Partner’s approval and the terms of a separate financing agreement (“Financing Agreement”) between Purchaser and Financing Partner. Purchaser acknowledges and agrees that [(i) Financing Partner is in no way affiliated with TK Elevator, (ii) Financing Partner will make any decision to offer financing to Purchaser independently and in accordance with its internal lending policies, (iii) TK Elevator cannot guaranty that Financing Partner will agree to provide financing to Purchaser on acceptable terms or at all, (iv) TK Elevator may be compensated by the Financing Partner in the event Purchaser enters into a Financing Agreement, and TK Elevator will not be a party to the Financing Agreement and shall have no responsibility for, and hereby expressly disclaims any liability arising out of or relating to, any decision on the part of Financing Partner to provide or decline to provide financing to Purchaser, and the negotiation, execution, performance, enforcement, or termination of any Financing Agreement. Purchaser acknowledges and agrees that Purchaser shall remain unconditionally and irrevocably liable to TK Elevator for any unpaid balance owing hereunder and TK Elevator’s acceptance of the Financing Partner as a payment source shall not constitute a novation, satisfaction, waiver, or release of Purchaser’s payment obligations under this Agreement.
Notwithstanding the foregoing, in the event Purchaser enters into a Financing Agreement with the Financing Partner and the Financing Partner fails or refuses to disburse any portion of the purchase price to TK Elevator for any reason, including without limitation default by either party under the Financing Agreement, bankruptcy or insolvency of either party, or termination of the Financing Agreement for any reason any unpaid purchase price then owing by Purchaser which shall be payable immediately by Purchaser upon demand by TK Elevator in accordance with this Agreement.
Purchaser hereby waives any right of setoff, counterclaim, defense, or deduction against TK Elevator based on any act or omission of the Financing Partner. Purchaser further agrees that any assignment by TK Elevator to the Financing Partner of the right to receive payment hereunder shall not impair TK Elevator’s rights or remedies in the event of nonpayment. The obligations of Purchaser under this paragraph shall survive any termination, cancellation, or expiration of this Agreement.
Any work that Purchaser may require prior to turnover of the equipment that is outside of the scope described in this Proposal - other than Temporary Use as described below - will be performed only after the full execution of a mutually agreeable change order and only at the following rates:
Mechanic (Standard) per hour $450.06
Mechanic (OT) per hour $742.50
Team (Standard) per hour $810.10
Team (OT) per hour $1,335.66
Rates are not inclusive of any per diem, mileage or other expenses which may be dependent on jobsite location and are valid until 05-13-2027 .
03 Warranty
TK Elevator warrants any equipment it installs as described in this Proposal against defects in material and workmanship for a period of one (1) year from the date of Purchaser’s execution of TK Elevator's “Final Acceptance Form” on the express conditions that all payments made under this Proposal and any mutually agreed-to change orders have been made in full and that such equipment is currently being serviced by TK Elevator. In the event that TK Elevator's work is delayed for a period greater than six (6) months, the warranty shall be reduced by the amount of the delay. This warranty is in lieu of any other warranty or liability for defects. TK Elevator makes no warranty of merchantability and no warranties which extend beyond the description in this Proposal, nor are there any other warranties, expressed or implied, by operation of law or otherwise. Like any piece of fine machinery, the equipment described in this Proposal should be periodically inspected, lubricated, and adjusted by competent personnel. This warranty is not intended to supplant normal maintenance service and shall not be construed to mean that TK Elevator will provide free service for periodic examination, lubrication, or adjustment, nor will TK Elevator correct, without a charge, breakage, maladjustments, or other trouble arising from normal wear and tear or abuse, misuse, improper or inadequate maintenance, or any other causes other than defective material or workmanship. In order to make a warranty claim, Purchaser must give TK Elevator prompt written notice at the address listed on the cover page of this Proposal and provided all payments due under the terms of this Proposal and any mutually agreed to written change orders have been made in full, TK Elevator shall, at its own expense, correct any proven defect by repair or replacement. TK Elevator will not, under any circumstances, reimburse Purchaser for cost of work done by others, nor shall TK Elevator be responsible for the performance of any equipment that has been the subject of service, repair, replacement, revisions or alterations by others. The Purchaser agrees to provide us access to the elevator equipment at any reasonable time for the purpose of making good this warranty. Purchaser and/or Owner agree to maintain the confidentiality of the TK Elevator’s software that is licensed for the Owner’s use. The software will not be copied, modified, distributed, or reverse engineered. The software is licensed to the Purchaser and/or Owner exclusively for the location of installation, and the license will not transfer except as part of a transfer, assumption, or succession of ownership. If there is more than one (1) unit which is the subject of work described in this Proposal, this section shall apply separately to each unit as accepted.
04 Preventative Maintenance Program
This Proposal does not include any maintenance, service, repair or replacement of the equipment or any other work not expressly described herein. TK Elevator may submit a separate proposal to Purchaser covering the maintenance and repair of this equipment to be supplied to Purchaser at an additional cost. In the event the Purchaser and TK Elevator have a new or existing maintenance Agreement in effect at the time of the acceptance of this proposal and/or during the scope of this work, the terms of the Agreement shall remain in full force and effect throughout the performance of this scope of work and continue throughout the duration of the stated term in that Agreement.
05 TKE Digital
The cost of TK Elevator digital hardware is included in the price of this Proposal. Activation of the digital service package(s) listed below is contingent upon Purchaser's (or Owner's, as applicable) signed acceptance of a separate elevator maintenance agreement with TK Elevator which includes both pricing and scope for such digital service(s).
MAX
MAX is a cloud based Internet of Things (IoT) platform that we, at our election, may connect to your elevators by means of installing a remote-monitoring device or modem (each a “device”). MAX will analyze the unique signal output of your equipment 24/7 and when existing or potential outages are identified, MAX will automatically communicate with our dispatch centers. With an eligible MAX digital service, our dispatch center will alert our technicians through a generated service ticket during normal working hours. These MAX alerts provide the technician with precise diagnostics detail, which greatly enhances our ability to fix your equipment right the first time, MAXimizing the equipment uptime.
a. Purchaser authorizes TK Elevator and its employees to access purchaser’s premises to install, maintain and/or repair the devices and, upon termination of the service agreement, to remove the same from the premises if we elect to remove.
b. TK Elevator is and shall remain the sole owner of the devices and the data communicated to us by the devices. The devices shall not become fixtures and are intended to reside where they are installed. TK Elevator may remove the devices and cease all data collection and analysis at any time. c. If the service agreement between TK Elevator and Purchaser is terminated for any reason, TK Elevator will automatically deactivate the data collection, terminate the device software and all raw data previously received from the device will be removed and/or expunged or destroyed. d. Purchaser consents to the installation of the devices in your elevators and to the collection, maintenance, use, expungement and destruction of the daily elevator data as set forth in this agreement. e. The devices installed by TK Elevator contain trade secrets belonging to us and are installed for the use and benefit of our personnel only.
f. Purchaser agrees not to permit purchaser personnel or any third parties to use, access, tamper with, relocate, copy, disclose, alter, destroy, disassemble or reverse engineer the device while it is located on purchaser’s premises.
g. The installation of this equipment shall not confer any rights or operate as an assignment or license to you of any patents, copyrights or trade secrets with respect to the equipment and/or any software contained or imbedded therein or utilized in connection with the collection, monitoring and/or analysis of data.
06 Work Not Included
There are certain items that are not included in this Proposal, many of which must be completed by Purchaser prior to and as a condition precedent to TK Elevator's performance of its work as described in this Proposal. In order to ensure a successful completion of this project, it shall be solely Purchaser’s responsibility to coordinate its own completion of those items with TK Elevator. The following is a list of those items that are not included in this Proposal:
A. Hoistways and Equipment Rooms
• Purchaser shall provide the following
• A dry legal hoistway, properly framed and enclosed, and including a pit of proper depth and overhead. This is to include steel hoist beam, inspection or access platforms, access doors, sump pump, lights, waterproofing and venting as required; dewatering of pit(s) and required permanent screening. • A dry legal machine/control room, with clear rollable access adequate for the elevator equipment, including floors, trap doors, properly sized legal machine room doors, gratings, machine room or roof access platforms, roof/loading protection, ladders, railings, foundations, all hoist beams, lighting, ventilation sized per the TK Elevator shop drawings and/or code requirements. Purchaser must maintain machine/control room (or machine/control space within the shaft for MRL equipment) temperature between 55 and 90 degrees Fahrenheit, with relative humidity less than 95% non-condensing at all times. • Adequate bracing of entrance frames to prevent distortion during wall construction. • All grouting, fire caulking, cutting, x-ray and removal of walls and floors, patching, coring, setting of sleeves/knockouts, penetrations and painting (except as specified) and removal of obstructions required for elevator work; along with all proper trenching and backfilling for any underground piping and/or conduit. • All labor and materials necessary to support the full width of the hoistway at each landing for anchoring or welding TK Elevator sill supports, steel angles, sill recesses; • The furnishing, installing and maintaining of the required fire rating of elevator hoistway walls, including the penetration of firewall by elevator fixture boxes;
• Ensuring that the elevator hoistways and pits are dewatered, cleaned and properly waterproofed; • TK Elevator is not responsible for verifying field dimensions or related work by others. Purchaser must verify all dimensions on the submittal drawings prior to equipment fabrication.
B. Electrical and Life Safety:
• Purchaser shall provide a dedicated, analog telephone or data line to the elevator telephone or communication device; one additional data line per group of elevators for diagnostic capability wired to designated controller; • Purchaser shall provide:
• permanent 3-phase power with suitable connections from the power main to each controller and signal equipment feeders as required, including necessary circuit breakers and fused mainline disconnect switches per N.E.C. prior to installation. Permanent 3-phase power supply capable of operating the new elevator equipment under all conditions, no generator power, or manufactured power, will be acceptable; • piping and wiring to controller for mainline power, car lighting, and any other building systems that interface with the elevator controls per N.E.C. Articles 620-22 and 620-51; • any required hoistway / wellway, machine room, pit lighting and/or 110v GFCI service outlets; • conduit and wiring for remote panels to the Unit machine room(s) and between panels. Remote panels required by local jurisdictions are not included in this proposal;
• a bonded ground wire, properly sized, from the Unit controller(s) to the primary building ground; and all remote wiring to the outside alarm bell as requested by all applicable code provisions; • installed sprinklers, smoke/heat detectors on each floor, machine room and hoistways / wellways, shunt trip devices (not self-resetting) and access panels as may be required as well as normally open dry contacts for smoke/heat sensors, which shall be terminated by Purchaser at a properly marked terminal in the Unit controller; • a means to automatically disconnect the main line and the emergency power supply to the unit prior to the application of water in the Unit machine room that shall not be self-resetting; • emergency power supply including automatic time delay transfer switch and auxiliary contacts with wiring to the designated Unit controller and along with electrical cross connections between elevator machine rooms for emergency power purposes;
• the following emergency power provisions are not included: interface in controller, pre-testing and testing, emergency power keyswitches;
• emergency power operation is included as part of the design of the Unit control system and based on each car in the group only, to properly sequence, one at a time to the programmed landing, and park. The design requires that the generator, transfer switch, and related circuitry are sufficient to run this function or any other function for any building other system that is associated with this project. In the event that the generator, transfer switch, and related circuitry are not sufficient, TK Elevator will provide Purchaser with a written change order for Purchaser’s execution.
• a dry set of contacts which close 20 seconds prior to the transfer from normal power to emergency power or from emergency power to normal power whether in test mode or normal operating conditions in the event that an emergency power supply will be provided for the Unit;
• confirmation that the emergency standby power generator and/or building can accept the power generated to and from the Unit during both Hi-Speed and Deceleration. In cases where the generator and/or building load is not electrically sized to handle the power return from the regen drive, additional separate chopper and resistor units are available for purchase but not included in this proposal. The additional chopper and resistor units allow regenerated power to be dissipated in the resistor bank and not sent back into the building grid.
C. Miscellaneous:
• Purchaser shall provide all work relating to the finished flooring including, but not limited to, the provision of materials and its installation to comply with all applicable codes; • Hydraulic jack replacement:
• the excavation of the elevator cylinder well hole in the event drilling is necessary through soil that is not free from rock, sand, water, building construction members and obstructions. Should obstructions be encountered, TK Elevator will proceed only after written authorization has been received from the Purchaser. The contract price shall be increased by the amount of additional labor at TK Elevator's standard labor rates as per the local office along with any additional expenses and materials required; • adequate ingress and egress, including ramping, for rail-mounted or truck-mounted drill rig; • Purchaser is responsible for pumping truck contractor to remove and dispose of spoils from the site. In the event that unforeseen and unfavorable below ground conditions are encountered, including but not limited to concrete around the cylinder, construction debris, adverse water and/or soil conditions, erosion, cavitations, oil contamination, or circumstances necessitating increased hole depth, etc., which require the employment of specialized contractors, TK Elevator shall immediately advise the Purchaser and costs will be extra to the contract; • in ground protection systems other than TK Elevator's standard HDPE or PVC protection system with bottomless corrugated steel casing;
• any required trenching and backfilling for underground piping or casings, and conduit as well as any compaction, grouting, and waterproofing of block-out;
• engineering, provision and installation of methane barriers or coordination/access; • access to 2" pressurized water supply within 100'-0" of the jack hole location; • a safe, accessible storage area for placement of D.O.T. 55 gallon containers for the purpose of spoils containment; obtaining of local environmental or disposal permits
• any spoils or water testing;
07 Working Hours, Logistics and Mobilization
• All work described in this Proposal shall be performed during TK Elevator's regular working days – defined as Monday thru Friday and excluding IUEC recognized holidays – and regular working hours – defined as those hours regularly worked by TK Elevator mechanics at the TK Elevator branch office that will provide labor associated with the performance of the work described in this Proposal - unless otherwise specified and agreed to in writing by both TK Elevator and Purchaser (hereinafter TK Elevator's regular working days and regular working hours shall be collectively defined as “normal working hours”). TK Elevator shall be provided with uninterrupted access to the Unit hoistway and machine room areas to perform work during normal working hours. • Purchaser shall provide on-site parking to all TK Elevator personnel at no additional cost to TK Elevator. • Purchaser shall provide traffic control, lane closures, permits and flagmen to allow suitable access/unload of tractor trailer(s).
• Purchaser agrees to provide unobstructed tractor-trailer access and roll-able access from the unloading area to the Unit hoistways or wellways (as applicable).
• Purchaser will be required to sign off on the Material Release Form, which will indicate the requested delivery date of equipment to the site. If Purchaser is not ready to accept delivery of the equipment within ten (10) business days of the agreed upon date, Purchaser will immediately make payments due for equipment and designate an area adjacent to the elevator shaft where Purchaser will accept delivery. If Purchaser fails to provide this location or a mutually agreeable alternative, TK Elevator is authorized to warehouse the equipment at the TK Elevator warehouse or designated distribution facility at Purchaser's risk and expense. Purchaser shall reimburse TK Elevator for all costs due to extra handling and warehousing. Storage beyond ten (10) business days will be assessed at a rate of $125.00 per calendar day for each unit listed in this Proposal, which covers storage and insurance of the elevator equipment and is payable every (30) calendar days.
• Purchaser agrees to provide a dry and secure area adjacent to the hoistway(s) at the ground level for storage of the Unit equipment and tools within ten (10) business days from receipt at the local TK Elevator warehouse. Any warranties provided by TK Elevator for vertical transportation equipment will become null and void if equipment is stored in any manner other than a dry, climate controlled enclosed building structure. Any relocation of the equipment as directed by Purchaser after initial delivery will be at Purchaser's expense. • You agree that if you are not ready to permit us to begin the installation of the equipment when we notify you when all or part of it is ready for shipment, you will immediately pay us a sum equal to the amount which would be payable to us if the elevator equipment or such part of it had actually been shipped and delivered. Unless you promptly provide to us a secure and convenient storage area, we are authorized to warehouse the elevator(s) at your risk and in any event, you shall reimburse us for all costs due to extra handling and warehousing. • TK Elevator includes one mobilization to the jobsite. A mobilization fee of $5,000.00 (minimum) per crew per occurrence will be charged for pulling off the job or for any delays caused by others once material has been delivered and TK Elevator's work has commenced.
• Access for this project shall be free and clear of any obstructions. A forklift for unloading and staging material shall also be provided by Purchaser at no additional cost.
• Purchaser shall provide an on-site dumpster. TK Elevator will be responsible for cleanup of Unit packaging material; however, composite cleanup participation is not included in this Proposal. • The hiring of a disposal company which MUST be discussed prior to any material being ordered or work being scheduled. TK Elevator will provide environmental services ONLY if this is specifically included under the "Scope of Work" section above. TK Elevator assumes no responsibility and/or liability in any way whatsoever for spoils or other contamination that may be present as a result of the cylinder breach and/or other conditions present on the work site.
• One or more of the units described in this Proposal will be out of service and unavailable to move passengers and/or property during entire duration of the performance of the work described in this Proposal until re-certified by the applicable authority(ies) having jurisdiction and in good standing with payment schedules. • If site specific rules and regulations classify the elevator pit as confined space, elevator pits will need to reclassify a permit-required space to a non-permit required space prior to mobilization.
08 Temporary Use, Inspection and Turnover
• Unless required by specification, TK Elevator will not provide for “temporary use” of the Unit(s) described in this Proposal prior to completion and acceptance of the complete installation. Temporary use shall be agreed to via a change order to this Proposal which shall require Purchaser’s execution of TK Elevator's standard Temporary Use Agreement. All labor, parts, repairs, adjustments, and/or refurbishment including callbacks required during the temporary use period will be billed at TK Elevator's billing rates listed in this proposal or TK Elevator's local service billing rates.
• Cost for temporary use of a Unit shall be $200.00 per calendar day per hydraulic elevator and $250.00 per calendar day for each traction elevator for rental use only (minimum rental period is 30 calendar days), excluding personnel to operate.
• In the event that a Unit must be provided for temporary use, TK Elevator will require 30 days to perform final adjustments and re-inspection after the elevator has been returned to TK Elevator with all protection, intercoms and temporary signage removed. This duration does not include any provisions for finish work or for repairs of same, which shall be addressed on a project-by-project basis. • Cost for preparation of controls for temporary use, refurbishment due to normal wear and tear, readjustment and re-inspection is $5,000.00 per Unit up to 10 floors in addition to costs for replacement or refurbishment of equipment based on special circumstances. For projects above 10 stops, an additional cost of $1,500.00 / 10 floors shall apply.
• These costs are based on work performed during normal working hours. Temporary use excludes vandalism or misuse. Any required signage, communication devices, elevator operators, and protection are not included while temporary use is being provided. All overtime premiums for repairs during the temporary use period will be billed at the billing rates listed in this proposal or TK Elevator's local service billing rates. • The Proposal price set forth above includes one (1) inspection per Unit by the applicable authority having jurisdiction and/or third party inspectors where the equipment is located. In the event the equipment fails that inspection due to no fault of TK Elevator, TK Elevator will charge Purchaser for both the entire cost of each re-inspection which shall be $1,500.00 per Unit and a remobilization fee which shall be $5,000.00 per Unit, plus any additional costs that may apply, via change order prior to scheduling a re-inspection. In the event the inspection fails due to items caused by both parties, the aforementioned fees will be prorated based on the number of items by each party. • Upon notice from TK Elevator that the installation and/or modernization of the equipment is complete, Purchaser will arrange to have present at the jobsite a person authorized to make the final inspection and to execute TK Elevator's “Final Acceptance Form“ prior to turnover of each Unit. The date and time that such person will be present at the site shall be mutually agreed upon but shall not be more than ten (10) business days after the date of TK Elevator's notice of completion to Purchaser unless both TK Elevator and Purchaser agree to an extension of that ten (10) day period in writing. Such final inspection and execution of TK Elevator's “Final Acceptance Form” shall not be unreasonably delayed or withheld.
• Should the Purchaser or the local authority having jurisdiction require TK Elevator's presence at the inspection of equipment installed by others in conjunction with the work described in this Proposal, Purchaser agrees to compensate TK Elevator for its time at TK Elevator's billing rates as shown in this proposal. • At the conclusion of its work, TK Elevator will remove all equipment and unused or removed materials from the project site and leave its work area in a condition that, in TK Elevator's sole opinion, is neat and clean. • Purchaser agrees to accept a live demonstration of equipment’s owner-controlled features on the same day as the turnover of each unit in lieu of any maintenance training required in the bid specifications. • Purchaser agrees to accept TK Elevator's standard owner’s manual in lieu of any maintenance, or any other, manual(s) required in the bid specifications. Any additional electronic copies or hard copies required will be subject to an additional charge of $275.00. No program source coding, printed circuit board schematics, diagnostic hardware or codes will be provided.
• Should use of equipment be required prior to substantial completion, the Purchaser agrees to the signing of an interim maintenance agreement as outlined in Section 04. Any repairs, re-balancing, and cleaning as a result of interim use to restore equipment to as new condition will be extra to the Proposal.
09 Additional Terms and Conditions
a. In no event shall TK Elevator be responsible for liquidated, consequential, indirect, incidental, exemplary, and special damages associated with the work described in this Proposal. b. This Proposal is made without regard to compliance with any special purchasing, manufacturing or construction/installation requirements including, but not limited to, any socio-economic programs, such as small business programs, minority or woman owned business enterprise programs, or local preferences, any restrictive sourcing programs, such as Buy American Act, or any other similar local, state or federal procurement regulations or laws that would affect the cost of performance. Should any such requirements be applicable to the work described in this Proposal, TK Elevator reserves the right to modify this Proposal or rescind it altogether. c. TK Elevator is an equal opportunity employer.
d. TK Elevator's performance of the work described in this Proposal is contingent upon Purchaser furnishing TK Elevator with any and all necessary permission or priority required under the terms and conditions of government regulations affecting the acceptance of this Proposal or the manufacture, delivery or installation of the equipment. All applicable sales and use taxes, permit fees and licenses imposed upon TK Elevator as of the date of the Proposal are included in the price of the Proposal. Purchaser is responsible for any additional applicable sales and use taxes, permit fees and licenses imposed upon TK Elevator after the date of the Proposal or as a result of any law enacted after the date of the Proposal. e. The price of this Proposal includes value added taxes, tariffs, duties, and/or similar charges that are in effect as of the date of this Proposal. Purchaser is responsible to pay TK Elevator any and all additional amounts for the materials and/or components described in this Proposal above and beyond the pricing set forth in this Proposal for the reasons set forth in any of the following three (3) categories along with profit and overhead: (1) value added taxes, tariffs, duties, and/or other charges imposed by applicable governmental authorities that are in effect when such materials and/or components are ready to ship; (2) additional or increased charges to TK Elevator from any of the material and/or component suppliers after the date of this Proposal; and/or (3) additional or increased charges to TK Elevator from its shippers and/or freight forwarders of such materials and/or components after the date of this Proposal. When the materials and/or components called for in this Proposal are ready to ship, if required TK Elevator will provide Purchaser with a change order(s) covering all additional amounts mentioned in the preceding sentence which must be executed and fully paid for prior to and as a condition precedent to delivery of those materials and/or components to the jobsite or to the provision of any labor on the project.
f. Purchaser agrees to provide TK Elevator's personnel with a safe place in which to work and TK Elevator reserves the right to discontinue work at the jobsite whenever, in TK Elevator's sole opinion, this provision is being violated.
g. The pricing set forth in this Proposal assumes that the elevator pits will not be classified as a confined space.
TK Elevator will follow its standard safety policy and procedures. Any job specific safety requirements over and above TK Elevator's standard practices and policies may require additional costs. h. TK Elevator will furnish and install all equipment in accordance with the terms, conditions, scope and equipment nomenclature as noted herein. Requested changes or modifications to such provisions will require a written change order issued on the Purchaser’s letterhead and accepted by TK Elevator in writing prior to the execution of such work. This change order shall detail the current Proposal price, the amount of the change, and new Proposal value.
i. This Proposal does not include a schedule for the work described and any such schedule shall be mutually agreed upon by an authorized representative of both TK Elevator and Purchaser in writing before becoming effective.
j. In the event asbestos material is knowingly or unknowingly removed or disturbed in any manner at the jobsite, Purchaser shall monitor TK Elevator's work place and prior to and during TK Elevator's manning of the job, Purchaser shall certify that asbestos in the environment does not exceed .01 fibers per cc as tested by NIOSH 7400. In the event TK Elevator's employees or those of TK Elevator's subcontractors are exposed to an asbestos hazard, PCP’s, lead or other hazardous substances, Purchaser agrees, to the fullest extent permitted by law, to indemnify, defend, and hold TK Elevator harmless from all damages, claims, suits, expenses, and payments resulting from such exposure. Identification, notification, removal and disposal of asbestos containing material, PCP’s lead or other hazardous substances are the responsibility of the Purchaser. k. TK Elevator retains title to and a security interest in all equipment it supplies – which TK Elevator and Purchaser agree can be removed without material injury to the real property – until all payments including deferred payments and any extensions thereof, are made. In the event of any default by Purchaser on any payment, or any other provision of this Proposal, TK Elevator may take immediate possession of the equipment and enter upon the premises where it is located – without legal process – and remove such equipment or portions thereof, irrespective of the matter of its attachment to the real estate or the sale, mortgage or lease of the real estate. Pursuant to the Uniform Commercial Code, and at TK Elevator's request, Purchaser agrees to execute any financial or continuation statements which may be necessary for TK Elevator to file in public offices in order to perfect TK Elevator's security interest in such equipment. l. TK Elevator reserves the right to assign payments owed to TK Elevator under this Proposal. m. TK Elevator shall not be liable for any loss, damage or delay caused by acts of government, labor troubles, strikes, lockouts, fire, explosion, theft, floods, riot, civil commotion, war, malicious mischief, acts of God or any cause beyond its control.
n. The rights of TK Elevator under this Proposal shall be cumulative and the failure on the part of the TK Elevator to exercise any rights hereunder shall not operate to forfeit or waive any of said rights. Any extension, indulgence or change by TK Elevator in the method, mode or manner or payment or any of its other rights shall not be construed as a waiver of any of its rights under this Proposal. o. In the event TK Elevator engages a third party to enforce the terms of this Proposal, and/or to collect payment due hereunder, either with or without suit, Purchaser agrees to pay all costs thereof together with reasonable attorney’s fees. Purchaser does hereby waive trial by jury and does hereby consent to the venue of any proceeding or lawsuit under this Proposal to be in the county where the work covered by this Proposal is located. p. TK Elevator can furnish Certificate of Workers’ Compensation, Bodily Injury and Property Damage Liability Insurance coverage to Purchaser upon written request.
q. Should loss of or damage to TK Elevator's material, tools or work occur at the project site, Purchaser shall compensate TK Elevator for such loss, unless such loss or damage results from TK Elevator's own acts or omissions.
r. Purchaser, in consideration of TK Elevator performing the services set forth in this Proposal, to the fullest extent permitted by law expressly agrees to indemnify, defend, save harmless, discharge, release and forever acquit TK Elevator Corporation, TK Elevator Manufacturing, Inc., their respective employees, officers, agents, insurers, affiliates, and subsidiaries (hereinafter singularly a “TK Elevator party“ and collectively the “TK Elevator parties“) from and against any and all claims, demands, suits, and proceedings for loss, property damage (including damage to the equipment which is the subject matter of this Proposal), personal injury or death that are alleged to either have arisen out of or be connected with the sale, marketing, presence, use, misuse, maintenance, installation, removal, modernization, manufacture, design, operation or condition of the equipment that is the subject matter of this Proposal or the labor and materials furnished in connection with this Proposal. Purchaser’s duty to indemnify a TK Elevator party does not apply to the extent that the loss, property damage (including damage to the equipment which is the subject matter of this Proposal), personal injury or death is determined to be caused by or resulting from the negligence of that TK Elevator party. Purchaser recognizes that its obligation to defend the TK Elevator parties under this clause, which is separate and apart from its duty to indemnify the TK Elevator parties, includes payment of all attorneys’ fees, court costs, judgments, settlements, interest and any other expenses of litigation arising out of such claims, demands, suits or proceedings.
s. Purchaser further expressly agrees to name TK Elevator parties along with their respective officers, agents, affiliates and subsidiaries as additional insureds in Purchaser’s liability and any excess (umbrella) liability insurance policy(ies). Such insurance must insure TK Elevator parties for those claims and/or losses referenced in the above paragraph and those claims and/or or losses arising from the negligence of TK Elevator parties. Such insurance must specify that its coverage is primary and non-contributory. Purchaser hereby waives its right of subrogation.
t. TK Elevator's participation in any controlled insurance program is expressly conditioned upon review and approval of all controlled insurance program information and documentation prior to enrollment. Any insurance credits if applicable, will be provided at that time.
u. Unless so mutually agreed upon in a separate signed agreement, TK Elevator shall not be required to interact or correspond with any third party with whom Subcontractor is not in privity of contract concerning matters pertinent to this Agreement.
v. The Purchaser must inform TK Elevator if Purchaser is, or becomes, an individual or entity that is - or that is majority owned or controlled by a party that is - included on any list of restricted parties maintained by (i) the United States of America; (ii) Canada; (iii) the European Union or any EU member state; (iv) the UK; (v) the United Nations; or (vi) any other national authority binding the parties of this contract.
In case the Purchaser, or any other beneficiary of this transaction, e.g. the end-user, is or becomes an individual or entity that is - or that is majority owned or controlled by a party that is - included on any list of restricted parties, TK Elevator reserves the right to cancel this Proposal immediately.
If the goods subject to this Proposal would be exported, re-exported, resold, used, transferred or otherwise disposed of in violation of any sanctions applicable to TK Elevator, TK Elevator also reserves the right to cancel this Proposal immediately. In this respect, the Purchaser shall be obliged to disclose the final delivery address, end-user and end-use of the goods upon request - insofar as legally permissible - and to notify TK Elevator of all circumstances that indicate an aforementioned infringement. "Sanctions" means here any economic, trade or financial sanctions, laws, regulations, embargoes or restrictive measures imposed, enacted, administered or enforced by any Sanctions Authority. "Sanctions Authority" means (i) the United States of America; (ii) Canada; (iii) the European Union or any EU member state; (iv) the UK; (v) the UN Security Council; or(vi) any governmental institutions of any of the foregoing which administer Sanctions, including HM Treasury, OFAC, Global Affairs Canada and The Department of Treasury Board and Finance, the US State Department and the US Department of the Treasury.
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Resolutions TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: November 5, 2026
SUBJECT: Dispense with bidding for Mt. Vernon Facility soil analysis services and Amendment No. 4 to Agreement PW22-167.
1. Resolution determining that specialized soil and compost laboratory analysis and quality testing services cannot be reasonably obtained through the usual bidding procedures and authorizing the Finance Director to dispense with bidding and negotiate the purchase of the services, not to exceed $100,000 for the Mount Vernon Organics Recycling and Composting Facility.
2. Amendment No. 4 to Agreement No. PW22-167 with Soil Control Lab (increase compensation by $100,000 and extend the term to November 29, 2029) to continue to provide specialized soil and compost laboratory analysis and quality testing services for the Mount Vernon Organics Recycling and Composting Facility. (Ward 1)
RECOMMENDATION:
Staff recommend adoption of Resolution and approval of the Amendment.
BACKGROUND:
The City of Bakersfield’s Public Works Department operates the Mount Vernon Organics Recycling and Composting Facility, which processes organic materials for beneficial reuse. Specialized laboratory analysis and quality testing of soil and compost are necessary to support ongoing facility operations and evaluate processed materials. This testing verifies that finished products comply with state and federal regulatory thresholds for heavy metals, chemical contaminants, and pathogens such as fecal coliform and Salmonella. Rigorous analytical screening ensures municipal compliance, mitigates environmental liability, and guarantees that recycled organic materials are safe for distribution to the public.
On November 29, 2022, the City entered into Agreement No. PW22-167 with Soil Control Lab to provide soil and compost laboratory analysis and quality testing services. Staff recommend amending the agreement to address the City’s continued operational needs. The agreement, including all previous amendments, has reached the $100,000 department-level compensation limit and is scheduled to expire on November 29, 2026.
Public Works continues to require these specialized laboratory analysis and quality testing services for soil and compost generated and processed at the facility. Soil Control Lab provides the specialized testing and analytical services required by the City and has provided these services for over 18 years. Through this longstanding relationship, Soil Control Lab’s testing methods, analytical services, and operational knowledge have become integrated into the City’s facility operations. Retaining Soil Control Lab will allow the City to maintain the established integration, consistency in testing and analysis, and provide continuity of essential laboratory services without interruption. Given the specialized and proprietary nature of these services, staff recommend continuing with Soil Control Lab to support ongoing operations.
City Municipal Code Section 3.20.060(D)(2) permits the City to dispense with competitive bidding when work, supplies, equipment, or materials can reasonably be obtained from only one vendor due to restricted availability of such work, supplies, equipment or material, or because of the necessity to successfully integrate such work, supplies, equipment or materials into an existing City project or system.
Staff recommend adoption of the resolution to dispense with bidding and approval of Amendment No. 4 to Agreement No. PW22-167, extending the Agreement by an additional three years and increase compensation by $100,000 for a revised not-to-exceed amount of $200,000. The existing scope of services will remain unchanged. Approval of both actions would allow the City to continue obtaining necessary laboratory services without interruption.
FISCAL IMPACT:
Sufficient funds are available in the 2027-26 Fiscal Year Refuse Enterprise Fund. There is no fiscal impact to the General Fund.
COUNCIL GOAL:
Community Character & Quality of Life
ATTACHMENTS:
1. Resolution
2. Amendment No. 4 to Agreement No. PW22-167
-- Page 1 of 3 Pages --
RESOLUTION NO. ______________
A RESOLUTION OF THE BAKERSFIELD CITY
COUNCIL DISPENSING WITH FORMAL BIDDING
PROCEDURES IN THE PURCHASE OF
SPECIALIZED SOIL AND COMPOST
LABORATORY ANALYSIS SERVICES FROM SOIL
CONTROL LAB AND AUTHORIZING THE
PURCHASE OF THE SERVICE IN ACCORDANCE
WITH SECTION 3.20.060(D)(2) OF THE
BAKERSFIELD MUNICIPAL CODE.
WHEREAS, The City’s Public Works Department’s Mount Vernon Organics Recycling and Composting Facility processes organic materials to produce soil and compost for beneficial reuse; and
WHEREAS, Specialized soil and compost laboratory analysis and quality testing services are necessary to evaluate processed materials and support ongoing facility operations;
WHEREAS, Soil Control Lab has over 60 years of experience in the field of soil and compost laboratory analysis and quality testing; and WHEREAS, Soil Control Lab has provided specialized soil and compost laboratory analysis and quality testing services to the City for over 18 years; and WHEREAS, Soil Control Lab’s testing methods, analytical services, and operational knowledge have become integrated into the City’s facility operations; and
WHEREAS, The City continues to require specialized soil and compost laboratory analysis and quality testing of processed soil and compost materials, and Soil Control Lab’s proprietary testing methods, established analytical processes, and integration with the City’s facility operations support the continued use of its services to ensure consistency of laboratory testing; and WHEREAS, The Finance Director has determined that Soil Control Lab’s proprietary and specialized laboratory analysis and quality testing services are necessary to meet the City’s ongoing operational needs and that continuing with Soil Control Lab will preserve the integration of its established testing methods, analytical processes, and operational knowledge into the City’s facility operations and has recommended that this Council authorize dispensing with formal bidding requirements in accordance with Section 3.20.060(D)(2) of the Bakersfield Municipal Code.
-- Page 2 of 3 Pages --
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows:
1. The above recitals are true and correct and incorporated herein by this reference.
2. The Council hereby finds that the purchase of specialized soil and compost laboratory analysis and quality testing services can only be reasonably obtained from one vendor, Soil Control Lab, because of the necessity to maintain the integration of such work, supplies, equipment or materials into the City’s existing project or system.
3. The Finance Director is authorized to dispense with bidding in accordance with Section 3.20.060(D)(2) of the Bakersfield Municipal Code, and to negotiate the purchase of business license software and support services.
---------------oooOooo--------------
-- Page 3 of 3 Pages --
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ______________________, by the following vote:
YES: COUNCILMEMBER: ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER: _______________________________________________________________ ABSTAIN: COUNCILMEMBER: ________________________________________________________________ ABSENT: COUNCILMEMBER: ________________________________________________________________
_______________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio of the
Council of the City of Bakersfield
APPROVED __________________
By: ___________________________
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By: ___________________________
ASHLEY E. ZAMBRANO
Chief Assistant City Attorney
SOIL CONTROL LAB PW22-167 (4) Page 1
Updated – September 2026
AGREEMENT NO. PW22-167 (4)
AMENDMENT NO. 4 TO
AGREEMENT NO. PW22-167
This AMENDMENT NO. 4 TO AGREEMENT NO. PW22-167 is made and entered into on ________________, by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and SOIL CONTROL LAB, a sole proprietorship authorized to do business in California (referred to herein as “CONTRACTOR”). CITY and CONTRACTOR may be referred to individually as a “Party” and collectively as “Parties”.
R E C I T A L S
WHEREAS, on November 29, 2022, CITY and CONTRACTOR entered into Agreement No. PW22-167 in the amount of Forty Thousand Dollars ($40,000) to perform lab analysis on soil and compost for the Mount Vernon Organics Recycling and Composting Facility; and
WHEREAS, on November 28, 2023, CITY and CONTRACTOR amended Agreement No. PW22-167 to extend the term to November 29, 2024; and WHEREAS, on December 17, 2024, CITY and CONTRACTOR amended Agreement No. PW22-167 to extend the term to November 29, 2025; and WHEREAS, on November 26, 2025, CITY and CONTRACTOR amended Agreement No. PW22-167 to increase compensation by Sixty Thousand Dollars ($60,000) for a total compensation amount not to exceed One Hundred Thousand Dollars ($100,000) and to extend the term of the Agreement to November 29, 2026 to continue to perform lab analysis on soil and compost for the Mount Vernon Organics Recycling and Composting Facility; and WHEREAS, CITY continues to require laboratory analysis of soil and compost for the Mount Vernon Organics Recycling and Composting Facility; and WHEREAS, the parties desire to amend Agreement No. PW22-167 to extend the term for an additional three (3) years and increase compensation by One Hundred Thousand Dollars ($100,000) for a total compensation amount not to exceed Two Hundred Thousand Dollars ($200,000).
NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree as follows:
Docusign Envelope ID: 94BCFFDA-A6D5-8F97-822B-BC59CC89D9F7 SOIL CONTROL LAB PW22-167 (4) Page 2
Updated – September 2026
1. Section 2 of Agreement No. PW22-167 entitled
“COMPENSATION/PAYMENT PROCEDURE” is hereby amended to read as follows:
2. COMPENSATION/PAYMENT PROCEDURE. Compensation for
all works, services, or products called for under this Agreement shall consist of a total payment not to exceed TWO HUNDRED THOUSAND DOLLARS ($200,000) which shall be paid as set forth in Exhibit “A” attached hereto and incorporated by reference herein.
2. Section 3 of Agreement No. PW22-167 entitled “TERM” is hereby amended to read as follows:
3. TERM. Unless terminated sooner, as set forth herein, this Agreement shall terminate on November 29, 2029.
3. Except as amended herein, all provisions of Agreement No. PW22- 167 shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 4 to Agreement No. PW22-167 to be executed the day and year first above written.
"CITY" “CONTRACTOR”
CITY OF BAKERSFIELD SOIL CONTROL LAB
By: _______________________________ By: ________________________________ KAREN GOH Print Name: ________________________
Mayor Title: _______________________________
APPROVED AS TO CONTENT:
PUBLIC WORKS DEPARTMENT
By: ____________________________
ZACHARY MEYER
Public Works Director
APPROVED AS TO FORM: COUNTERSIGNED:
Chief Assistant City Attorney: ______________________ Finance Director: _____________________
ASHLEY ZAMBRANO RANDY MCKEEGAN
Insurance: ____________
Attachment: Exhibit A
S:\Public Works\Agrs\26-27\Soil Control Lab PW22-167 (4).docx Docusign Envelope ID: 94BCFFDA-A6D5-8F97-822B-BC59CC89D9F7 Compost Analyst
ASSAF SADEH
Certificate Of Completion
Envelope Id: 94BCFFDA-A6D5-8F97-822B-BC59CC89D9F7 Status: Completed Subject: Complete with Docusign: Soil Control Lab PW22-167 (4).pdf Source Envelope:
Document Pages: 2 Signatures: 1 Envelope Originator:
Certificate Pages: 4 Initials: 0 City Clerk's Office
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
[email protected]
IP Address: 174.46.226.5
Record Tracking
Status: Original
10/15/2026 4:12:17 PM
Holder: City Clerk's Office
[email protected]
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Signer Events Signature Timestamp
ASSAF SADEH
[email protected]
Compost Analyst
Security Level: Email, Account Authentication
(None) Signature Adoption: Pre-selected Style
Using IP Address: 216.173.139.60
Sent: 10/15/2026 4:13:50 PM
Viewed: 10/15/2026 4:16:46 PM
Signed: 10/15/2026 4:18:21 PM
Electronic Record and Signature Disclosure:
Accepted: 10/15/2026 4:16:46 PM
ID: 4dcae010-c319-4590-9e8e-265611a36502
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 10/15/2026 4:13:50 PM
Certified Delivered Security Checked 10/15/2026 4:16:46 PM Signing Complete Security Checked 10/15/2026 4:18:21 PM Completed Security Checked 10/15/2026 4:18:21 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Bakersfield (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system.
Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/28/2022 10:51:05 AM Parties agreed to: ASSAF SADEH
Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us.
How to contact City of Bakersfield:
You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows:
To contact us by email send messages to: [email protected] To advise City of Bakersfield of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at [email protected] and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address.
If you created a DocuSign account, you may update it with your new email address through your account preferences.
To request paper copies from City of Bakersfield
To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to [email protected] and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with City of Bakersfield
To inform us that you no longer wish to receive future notices and disclosures in electronic format you may:
i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to [email protected] and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process..
Required hardware and software
The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide-signing-system-requirements.
Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.
By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:
You can access and read this Electronic Record and Signature Disclosure; and You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and
Until or unless you notify City of Bakersfield as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Bakersfield during the course of your relationship with City of Bakersfield.
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent – Job Specifications and Salary Updates
TO: Honorable Mayor and City Council
FROM: Christi Tenter, Human Resources Director
DATE: November 4, 2026
SUBJECT: Job Specification and Salary Resolution Updates 11.18.26
1. Revised Job Specification: Construction Inspector I/II #25250 / #25260
2. New Job Specifications: Service Desk Supervisor #57175
3. Amendment No. 5 to Resolution No. 144-2025 setting salaries and related benefits for the Unrepresented, General Supervisory, and Management Unit, updating unit name.
RECOMMENDATION:
Staff recommends adoption of the new and revised job specifications and Resolution.
BACKGROUND:
Human Resources oversees the administration of citywide class specifications. Periodically class specifications require updates to reflect changes and/or modernization to reflect current duties and required minimum qualifications. These updates provide an accurate description of the job duties, which is essential in providing candidates with a comprehensive overview of positions during recruitment efforts. New classifications may also be created to support organizational growth and skills required to meet work requirements. A summary of position updates to support current operational goals is summarized below:
1. Construction Inspector I/II –The classification has been historically staffed in the Public Works Department to perform detailed inspection of public works construction projects; interprets plans and specifications to ensure contract compliance; and prepares and recommends change orders and cost estimates.
The Water department is preparing for a significant increase in its workload due to a series of capital improvement projects (CIPs) planned over the next 10 years. These projects include essential infrastructure improvements, such as PFOS treatment for wells, H2S vessel replacement, and interface improvements. To ensure the efficient, high-quality completion of these projects, it is crucial to have a dedicated Construction Inspector on staff. During the last two fiscal years, the Water Department has expended over $1,000,000 in construction inspection services for CIPs that are similar in scope and size with future planned projects. The update to the specification adds assignments in the Water Department and essential functions. The position was approved, for addition, in the fiscal year 2026-27 budget.
2. Service Desk Supervisor #57175 – Elimination of one (1) Technology Systems (TS) Supervisor was part of the fiscal year 2026-27 department budget. The position was vacated when the incumbent was promoted to a Technology Services Manager in June 2025. Since that time the manager has balanced duties in both roles, continuing responsibilities as a direct supervisor over daily operations of the Service Desk unit. The new classification, Service Desk Supervisor, is part of a staff reduction, eliminating a TS Supervisor and reclassifying a Project Coordinator into the new role. This reorganization of supervisory staff will provide effective supervision of the service desk operations and create budget efficiencies.
Both specifications were presented and approved at the October 20, 2026, meeting of the Miscellaneous Civil Service Board
FISCAL IMPACT:
No additional budget requests, amounts are inclusive of FY 26-27 allocations.
COUNCIL GOAL:
Innovative and Efficient City Government
ATTACHMENTS:
1. Construction Inspector I II 25250 - 25260
2. Service Desk Supervisor 57175
3. Reso 145-2025 Amend 5 11.18.26
CITY OF BAKERSFIELD CLASS SPECIFICATION: 25250/25260
UNIT: WHITE COLLAR
EEO4: TECHNICIAN
CLASS TITLE: CONSTRUCTION INSPECTOR I/11 (FLEX)
CLASS SUMMARY:
This is a multi-divisional classification for use in Public Works and Water, or other related departments.
Under general supervision, performs detailed inspection of public works construction projects; interprets plans and specifications to ensure contract compliance; prepares and recommends change orders and cost estimates.
REPRESENTATIVE DUTIES:
The following typical tasks and responsibilities are representative of all positions in the class. They are descriptive, not limiting.
Essential Duties:
Interprets construction plans and specifications;
Prepares and makes recommendations on change orders;
Prepares cost estimates;
Maintains necessary records of daily operations including man-hours, equipment hours, and materials on site;
May inspect major architectural and engineering projects; Meets and confers with representatives of utility companies, contractors, engineers and other public agencies regarding construction plans and specifications.
When assigned to Public Works (in addition to general duties) duties may include but are not limited to:
Inspects a variety of Public Works construction and street maintenance projects, such as, sidewalks, structures, driveways, sewer mains;
Lateral installations, curbs, and gutters, retaining walls, earthwork, street excavation and patchwork, and drainage facilities to determine compliance with contract standards and specifications, State laws, and local ordinances;
May inspect major architectural and engineering projects; Answers citizen complaints and requests for information; Makes on-site safety and accident investigations, and posts locations scheduled for repair;
May perform duties on a survey party for construction survey projects.
When Assigned to Water (in addition to general duties) duties may include but are not limited to:
Inspects a variety of water-related construction and maintenance projects, such as wastewater treatment plant rehabilitation and improvements, hydraulic structures, water wells, potable water treatment and distribution, and drainage facilities; Determines compliance with contract standards and specifications, State laws and regulations, and local ordinances.
DISTINGUISHING CHARACTERISTICS:
Construction Inspector I
Is the entry-level class in this series. Initially under close supervision, incumbents learn proper inspection techniques and perform a variety of duties involving the inspection of construction projects. This class is alternately staffed with Construction Inspector II and incumbents may advance to the higher level after gaining experience and demonstrating proficiency, which meet the qualifications for the higher-level class.
Construction Inspector II
Is the skilled, working level class in this series. Under general supervision, incumbents perform the full range of assigned duties and assist in the orientation and training of the lower-level class.
QUALIFICATIONS GUIDE:
The level and scope of the knowledge and abilities listed below vary according to the I versus II levels distinguished in the previous section.
Knowledge of:
Laws, statutes, and ordinances governing engineering construction project; Common engineering construction methods;
Surveying principles and practices;
Proper usage of construction materials and equipment; safe work practices; mathematics. Public Works – Proper use of transits and levels.
Ability to:
Analyze and interpret complex engineering construction plans and specifications; Make quantity calculations and prepare estimates;
Inspect common engineering construction;
Enforce and interpret regulations with firmness, tact, and impartiality; Establish and maintain effective working relationships with contractors, property owners, and the public;
Perform accurate mathematical calculations;
Maintain construction inspection records and reports of work performed; Work independently in the field.
Training and Experience:
Construction Inspector I:
Graduation from high school or GED equivalent; AND
Two (2) years of experience in sub-professional engineering work including construction inspection, design drafting, design, engineering calculations, surveying, soils lab testing, or related area; OR
Two (2) years of college including engineering-related courses; AND One (1) year experience as an Engineering Technician or an Engineering Aide II.
Construction Inspector II:
In addition to the above, two (2) years of experience at a level equivalent to the City’s Construction Inspector I class.
Licenses, Certificates, Special Requirements:
Possession of a valid California Driver’s License, class “C.” Water - Possession of a Grade II Water Distribution certificate issued by the California State Water Resources Control Board (CSWRCB) is highly desirable.
Physical Conditions or Special Working Conditions:
Must be willing to work outdoors in all weather conditions.
Promotions to Construction Inspector II:
Promotion to Construction Inspector II from Construction Inspector I is made on a merit basis without examination subject to recommendation by the Department Head and approval of the City Manager.
Approved by the Miscellaneous Civil Service Board: August 18, 1992 Approved by the City Council: August 26, 1992
Updated to Form: March 9, 2022
Approved by the Miscellaneous Civil Service Board: October 20, 2026 Approved by the City Council: November 18, 2026
CITY OF BAKERSFIELD CLASS SPECIFICATION: 57175
UNIT: GENERAL SUPERVISORY
EEO4: PROFESSIONALS
CLASS TITLE: SERVICE DESK SUPERVISOR
CLASS SUMMARY:
Under general direction, supervises assigned staff in the Technology Services Service Desk and Desktop Support. This position assists in coordinating, assigning, organizing and collaborating to ensure proper application of Service Desk operations with other Supervisors and staff within Technology Services and/or City-wide; and performs other related work as required.
REPRESENTATIVE DUTIES:
The following typical tasks and responsibilities are representative of the position’s essential duties. They are descriptive, not limiting.
Essential Duties:
Plans, organizes, and supervises the daily activities of the TS Service Desk and desktop support teams;;
Coordinate schedules and ticket workflows to ensure optimal coverage and service levels; Establishes schedules and resource requirements for installation and maintenance of computer hardware and software, including all types of networking and storage equipment;
Participates in the development and implementation of policies and work standards; Maintains and monitors inventory of materials, systems, applications, and replacement parts;
Conducts quality assurance checks;
Develops and/or uses existing methodologies, processes, and standards for continual process improvement for the development of high-performance teams; Apply the continual process improvement processes to the Service Desk team as well as work with other TSD Supervisors on a regular or as-needed basis to assist in their team's development;
Evaluates employee performance, coordinates, and provides staff training; Coordinates work with other departments and other groups or divisions in Technology Services;
Maintains detailed statistical records and related reports; Develops processes and procedures relating to system operations and services; Evaluates work techniques and methods for conformance with desired standards; Acts as City representative to external agencies and vendors; consults with department heads or designated staff from all City departments;
Acts as project manager for multiple team projects; Supports TS special projects.
DISTINGUISHING CHARACTERISTICS:
This class is distinguished from Technology Systems Supervisor in that the position requires less technical expertise and more focus on customer service excellence and process workflows.
CLASS TITLE: SERVICE DESK SUPERVISOR #57175 (continued) MINIMUM QUALIFICATIONS:
Knowledge of:
Strong customer service principles and practices;
Employee supervision, evaluation, and training;
Project management principles and practices;
Public administration principles and methods including goal setting, procedure development, budget development, training, and evaluation; Principles and practices related to Helpdesk management; Principles and practices of process review and improvement; Principles and practices of proper knowledge base development; Strong understanding of meaningful metrics to gauge the health of the team and services, specifically those used in a customer service environment; General safety practices, safe work methods and safety regulations related to duties; Strong understanding of the organization’s goals and objectives; Maintains familiarity with laws, rules, and regulations governing maintenance and operation of communications equipment in City-wide government applications.
Ability to:
Plan, coordinate, direct, assign and evaluate the work of staff; Utilize strong documentation skills;
Utilize strong interpersonal skills;
Conduct research into issues, standards, and products as required; Present ideas in user-friendly language;
Be highly self-motivated and directed;
Pay keen attention to detail;
Apply strong analytical and problem-solving abilities; Effectively prioritize and execute tasks in a high-pressure environment; Incorporate strong customer service orientation;
Work in a team-oriented, collaborative environment;
Effectively supervise staff in handling system support; Make timely and accurate decisions regarding prioritization of trouble calls; Establish and maintain effective working relationships with co-workers and representatives of user departments;
Exercise independent judgment and initiative within established guidelines; Communicate clearly and concisely both orally and in writing; Make recommendations to the Technology Services Manager; Prepare and present reports to Technology Services and City management staff; Maintain accurate records;
Stay current with emerging technologies and best practices in the industry; Create and maintain standardized technical documentation, Standard Operating Procedures (SOPs);
Identify issues proactively and implement practical, timely solutions with sound judgment and minimal supervision;
Apply policies and procedures consistently and fairly; CLASS TITLE: SERVICE DESK SUPERVISOR #57175 (continued) Provide a high level of customer service while maintaining professionalism and responsiveness;
Lead the daily operations of a high-volume service desk while prioritizing and managing multiple complex tasks in a fast-paced environment.
Training and Experience:
Graduation from an accredited college or university with a bachelor’s degree in Information Technology, , Computer Science, Business or Public Administration, or related field; AND
Three (3) years of progressively responsible experience in a Customer Service-related field and one (1) year of lead or supervisory experience; OR
An equivalent combination of training, certification, and experience, which provides the capabilities to perform the described duties.
Licenses, Certificates and Special Requirements:
Possession of a valid California Class “C” driver’s license; Must be able to pass an extensive police background check.
Physical Conditions or Special Working Conditions:
Standard office environment and working conditions including lifting and placement of computer equipment weighing up to 50 pounds;
Must be willing to work varied hours including, holiday, evening, and weekends as assigned.
Approved by the Miscellaneous Civil Service Board: October 20, 2026 Approved by the City Council: November 18, 2026
RESOLUTION NO. _______
AMENDMENT NO. 5 TO RESOLUTION NO. 145-2025
SETTING SALARIES AND RELATED BENEFITS FOR
OFFICERS AND EMPLOYEES OF THE
UNREPRESENTED, GENERAL SUPERVISORY, AND
MANAGEMENT UNITS
WHEREAS, Resolution No. 145-2025 sets salaries and related benefits for employees of the Unrepresented, General Supervisory, and Management Units, NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield that effective immediately following Council action, the Salary Schedule, a part of the Resolution No. 145-2025 is hereby amended as follows:
1. Resolution No. 145-2025 is hereby amended by including and revising the salaries of the following class titles in the Unrepresented, General Supervisory, and Management Units:
57175 C Service Desk Supervisor
Step1 Step 2 Step 3 Step 4 Step 5
$ 47.823 $50.214 $52.729 $55.365 $58.137
2. Except as amended herein, all other provisions of Resolution No. 145- 2025, together with amendatory resolutions, remain in full force and effect. ----------oOo----------
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by the Council of the City of Bakersfield at a regular meeting thereof held on ______________________________ by the following vote:
AYES: COUNCILMEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER _______________________________________________________________ ABSTAIN: COUNCILMEMBER _______________________________________________________________ ABSENT: COUNCILMEMBER ______________________________________________________________ _ ________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED: _________________
By __________________________
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO, CITY ATTORNEY
By _________________________
VIRGINIA A. GENNARO
CITY ATTORNEY of the City of Bakersfield
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Megan Simpson, Communications Manager
DATE: October 28, 2026
SUBJECT: Agreement with California Interscholastic Federation (not to exceed $342,500) to host the State High School Wrestling Championships in Bakersfield RECOMMENDATION:
Staff recommends approval of the agreement
BACKGROUND:
In April of 2026, the Bakersfield Convention and Visitors Bureau (CVB) and AEG Management Bakersfield, LLC (AEG) won the proposal bid to host the California Interscholastic Federation (“CIF”) State High School Wrestling Championship in Bakersfield over the next five (5) years, in consideration of an annual contribution stipend from years 2027 through 2031.
The CIF State High School Wrestling Championship has been held at Dignity Health Arena, Theater and Convention Center since 2004 and annually draws an estimated 17,000 participants, spectators, and officials to Bakersfield. Event attendees occupy city hotel rooms, dine at local restaurants, and purchase other incidentals during their stay, generating an estimated economic impact (EEI) of $1.8 million per year.
The EEI includes the generation of new sales tax and Transient Occupancy Tax (TOT) that is primarily utilized for city services unrelated to travel and tourism. The total EEI of the five-year tournaments is $9 million.
For the past twenty-three (23) years, the CVB has provided a stipend to CIF in return for holding its annual State High School Wrestling Championship in Bakersfield. During the past five years, both the City of Bakersfield and AEG have contributed to CIF based on the approved reimbursement plan as follows:
2022: $87,500 (CVB $65,000 + AEG $22,500)
2023: $87,500 (CVB $65,000 + AEG $22,500)
2024: $87,500 (CVB $65,000 + AEG $22,500)
2025: $87,500 (CVB $65,000 + AEG $22,500)
2026: $87,500 (CVB $65,500 + AEG $22,500)
The proposal submitted to CIF for the following five-year period reimbursement plan is as follows:
2027: $90,000 (CVB $67,500 + AEG $22,500)
2028: $90,000 (CVB $67,500 + AEG $22,500)
2029: $90,000 (CVB $67,500 + AEG $22,500)
2030: $92,500 (CVB $70,000 + AEG $22,500)
2031: $92,500 (CVB $70,000 + AEG $22,500)
The total City contribution for this five-year period will be $342,500. This contribution is in addition to a total contribution from AEG for this five-year period of $112,500. As has been past practice, CIF will invoice both the City and AEG upon the completion of each year’s championship. For the 2027-2031 agreement, both the City and AEG will enter into separate agreements with CIF. Upon approval of this proposed agreement by Council, AEG will execute its separate agreement with CIF.
FISCAL IMPACT:
Transient Occupancy Tax (TOT) revenues are utilized for this agreement; General Funds will not be impacted by the action to approval of this agreement.
COUNCIL GOAL:
Economic Opportunity for All
Community Character & Quality of Life
Innovative and Efficient City Government
ATTACHMENTS:
Agreement
CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 1
AGREEMENT NO. ___________________
REIMBURSMENT AGREEMENT
BETWEEN THE CITY OF BAKERSFIELD
AND CALIFORNIA INTERSCHOLASTIC FEDERATION
This REIMBURSEMENT AGREEMENT (“Agreement”) is made and entered into on _______________________, by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and CALIFORNIA INTERSCHOLASTIC FEDERATION, a California Non-profit Corporation authorized to do business in California (referred to herein as “CONTRACTOR”).
R E C I T A L S
WHEREAS, on November 16, 2016, CITY and the Greater Bakersfield Convention and Visitors Bureau (“CVB”) entered into Agreement No. 16-251 regarding the management of the CVB and the marketing of Bakersfield as a destination center for conventions, sporting and other events and individual/group travel and tourism; and
WHEREAS, CITY and CVB have a common goal to increase CITY sales and Transient Occupancy Tax revenues; and
WHEREAS, CITY and CVB wish to publicize the benefits and advantages of CITY as a destination center for holding conventions; and WHEREAS, CITY has provided incentives to various organizations to hold events in the CITY; and
WHEREAS, CITY owns Dignity Health Arena, Theater, and Convention Center (“Arena”) which is available for organizations and groups wishing to hold conventions and said Arena is managed by AEG; and
WHEREAS, CONTRACTOR has held its annual California Interscholastic Federation (CIF) State High School Wrestling Championships and received an annual stipend toward facility rental costs at Arena for the past 22 years; and WHEREAS, CITY desires to provide future financial stipends for CONTRACTOR in return for CONTRACTOR hosting the 2027-2031 CIF State High School Wrestling Championships in Bakersfield; and
WHEREAS, CONTRACTOR will enter into a separate agreement with AEG for an additional annual financial stipend.
NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree as follows:
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 2
1. SCOPE OF WORK. In exchange for the Compensation (defined below), CONTRACTOR shall perform the following:
Host the 2027-2031 CIF State High School Wrestling Championships in accordance with CONTRACTOR’s objectives and practices (referred to herein as “events”) at Arena on the dates listed attached hereto as Exhibit “A” and incorporated by reference herein. The purpose of these events is to attract High School athletes and their families to Bakersfield from throughout the state (“Scope of Work”). The Scope of Work shall include all items and procedures necessary to properly complete the task CONTRACTOR has been hired to perform, whether specifically included in the Scope of Work or not.
2. COMPENSATION/PAYMENT PROCEDURE. Subject to the conditions of this section, CITY will pay CONTRACTOR as follows for performing the Scope of Work (“Compensation”):
2.1 From 2027 through 2029, Sixty-Seven Thousand Five Hundred Dollars ($67,500) for one annual event each year not to exceed Two Hundred Two Thousand Five Hundred Dollars
($202,500).
2.2 From 2030 through 2031, Seventy Thousand Dollars ($70,000) for one annual event in each year not to exceed One Hundred Forty Thousand Dollars ($140,000).
CITY will pay CONTRACTOR within thirty (30) days after CONTRACTOR submits an itemized invoice for the portions of the Scope of Work completed and that invoice is approved by CITY. The Compensation will be the total amount paid to CONTRACTOR for performing the Scope of Work and includes, but is not limited to, all out-of-pocket costs and taxes.
CITY will pay no other compensation to CONTRACTOR. In no case will CITY compensate CONTRACTOR more than an aggregated amount of Three Hundred Forty-Two Thousand, Five Hundred Dollars ($342,500) for performing the Scope of Work.
3. TERM. Unless terminated sooner, as set forth herein, this Agreement shall terminate on March 31, 2031.
4. TERMINATION. Either party may terminate this Agreement after giving the other party written notice, as provided herein, ten (10) days before the termination is effective.
5. ACCOUNTING RECORDS. CONTRACTOR shall maintain accurate accounting records and other written documentation pertaining to all costs incurred in performance of this Agreement. Such records and Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 3
documentation shall be kept at CONTRACTOR's office during the term of this Agreement, and for a period of three (3) years from the date of the final payment hereunder, and made available to CITY representatives upon request at any time during regular business hours.
6. ASSIGNMENT. Neither this Agreement nor any rights, interests, duties, liabilities, obligations or responsibilities arising out of, concerning or related in any way to this Agreement (including, but not limited to, accounts, actions, causes of action, claims, damages, demands, liabilities, losses, obligations, or reckonings of any kind or nature whatsoever, for compensatory or exemplary and punitive damages, or declaratory, equitable or injunctive relief, whether based on contract, equity, tort or other theories of recovery provided for by the common or statutory law) may be assigned or transferred by any party. Any such assignment is prohibited, and shall be unenforceable and otherwise null and void without the need for further action by the non-assigning party or parties.
7. BINDING EFFECT. The rights and obligations of this Agreement shall inure to the benefit of, and be binding upon, the parties to the Agreement and their heirs, administrators, executors, personal representatives, successors and assigns.
8. COMPLIANCE WITH ALL LAWS. CONTRACTOR shall, at CONTRACTOR’s sole cost, comply with all of the requirements of municipal, state, and federal authorities now in force, or which may hereafter be in force, pertaining to this Agreement, and shall faithfully observe in all activities relating to or growing out of this Agreement all municipal ordinances and state and federal statutes, rules or regulations, and permitting requirements now in force or which may hereafter be in force including, without limitation, obtaining a City of Bakersfield business tax certificate (Bakersfield Municipal Code Chapter 5.02) where required.
9. CORPORATE AUTHORITY. Each individual signing this Agreement on behalf of entities represents and warrants that they are, respectively, duly authorized to sign on behalf of the entities and to bind the entities fully to each and all of the obligations set forth in this Agreement.
10. COUNTERPARTS. This Agreement may be executed in any number of counterparts, each of which shall be considered as an original and be effective as such.
11. DIRECTION. CONTRACTOR retains the right to control or direct the manner in which the services described herein are performed.
12. EQUIPMENT. CONTRACTOR will supply all equipment, tools, materials and supplies necessary to perform the services under this Agreement.
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 4
13. EXECUTION. This Agreement is effective upon the date first written above and is the product of negotiation and all parties are equally responsible for authorship of this Agreement. Section 1654 of the California Civil Code shall not apply to the interpretation of this Agreement.
14. EXHIBITS. In the event of a conflict between the terms, conditions or specifications set forth in this Agreement and those in exhibits attached hereto, the terms, conditions, or specifications set forth in this Agreement shall prevail. All exhibits to which reference is made in this Agreement are deemed incorporated in this Agreement, whether or not actually attached.
15. FURTHER ASSURANCES. Each party shall execute and deliver such papers, documents, and instruments, and perform such acts as are necessary or appropriate, to implement the terms of this Agreement and the intent of the parties to this Agreement.
16. GOVERNING LAW. The laws of the State of California will govern the validity of this Agreement and its interpretation and performance. Any litigation arising in any way from this Agreement shall be brought in Kern County, California.
17. INCLUDED DOCUMENTS. Any bid documents, including, without limitation, special provisions and standard specifications and any Request for Proposals, Request for Qualifications and responses thereto relating to this Agreement are incorporated by reference as though fully set forth herein.
18. MUTUAL HOLD HARMLESS. The parties shall hold each other harmless from any and all actual or alleged claims, demands, causes of action, liability, loss, damage and/or injury (to property or persons, including without limitation wrongful death), whether brought by either party, an individual or other entity, or imposed by a court of law or by administrative action of any federal, state, or local governmental body or agency, arising out of or incident to any acts, omissions, negligence, or willful misconduct of either party, its personnel, employees, agents, contractors, or volunteers in connection with or arising out of this Agreement.
19. INDEPENDENT CONTRACTOR. This Agreement calls for CONTRACTOR’s performance of the Scope of Work as an independent contractor.
CONTRACTOR is not an agent or employee of CITY for any purpose and is not entitled to any of the benefits provided by CITY to its employees. This Agreement shall not be construed as forming a partnership or any other association with CONTRACTOR other than that of an independent contractor.
///
///
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 5
20. INSURANCE.
20.1 Types and Limits of Insurance. In addition to any other insurance or security required under this Agreement, CONTRACTOR must procure and maintain, for the duration of this Agreement, the types and limits of insurance below ("Basic Insurance Requirements").
20.1.1 Automobile liability insurance, providing coverage for owned, non-owned, and hired autos on an occurrence
basis for bodily injury, including death, of one or more persons, property damage, and personal injury, with limits of not less than $1,000,000 per occurrence.
20.1.2 Commercial general liability insurance, unless otherwise approved by CITY’s Risk Manager, providing coverage on
an occurrence basis for bodily injury, including death, of one or more persons, property damage, and personal
injury, with limits of not less than $1,000,000 per occurrence.
The policy must:
20.1.2.1 Provide contractual liability coverage for the terms of this Agreement;
20.1.2.2 Provide products and completed operations
coverage;
20.1.2.3 Provide premises, operations, and mobile
equipment coverage; and
20.1.2.4 Contain an additional insured endorsement in
favor of CITY and its mayor, council, officers,
agents, employees, and designated volunteers.
20.1.3 Workers' compensation insurance with limits of not less than $1,000,000 per occurrence. In accordance with the
provisions of Labor Code Section 3700, every contractor will be required to secure the payment of compensation to his employees. Pursuant to Labor Code Section 1861,
CONTRACTOR must submit to CITY the following
certification before beginning any work on the
Improvements:
I am aware of the provisions of Section 3700 of the
Labor Code which require every employer to be
insured against liability for worker’s compensation or
to undertake self-insurance in accordance with the
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 6
provisions of that code, and I will comply with such
provisions before commencing the performance of
the work of this contract.
By executing this Agreement, CONTRACTOR is submitting the certification required above.
The policy must contain a waiver of subrogation in favor of CITY and its mayor, council, officers, agents, employees, and designated volunteers.
20.2 General Provisions Applying to All Insurance Types.
20.2.1 All policies required of CONTRACTOR must be written on a first-dollar coverage basis, or contain a deductible
provision. Subject to CITY’s advance approval,
CONTRACTOR may utilize a self-insured retention in any or all of the policies provided, but the policy or policies may not contain language, whether added by endorsement or
contained in the policy conditions, that prohibits
satisfaction of any self-insured provision or requirement by anyone other than the named insured or by any means
including other insurance or which is intended to defeat the intent or protection of an additional insured.
20.2.2 All policies required of CONTRACTOR must be primary insurance as to CITY and its mayor, council, officers, agents, employees, or designated volunteers and any insurance or self-insurance maintained by CITY and its mayor, council, officers, agents, employees, and designated volunteers
must be excess of CONTRACTOR’s insurance and must not
contribute with it.
20.2.3 The insurance required above, except for workers’ compensation insurance, must be placed with insurers with a Best’s rating as approved by CITY’s Risk Manager, but in no event less than A-:VII. Any deductibles, self-insured retentions, or insurance in lesser amounts, or lack of certain types of insurance otherwise required by this Agreement, or insurance rated below Best’s A-:VII, must be declared prior to execution of this Agreement and approved by CITY in
writing.
20.2.4 The insurance required in this section must be maintained until the Scope of Work is satisfactorily completed as
evidenced by CITY’s written acceptance. All policies must Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 7
provide that there will be continuing liability thereon, notwithstanding any recovery on any policy.
20.2.5 Full compensation for all premiums which CONTRACTOR is required to pay to satisfy the Basic Insurance Requirements shall be considered as included in the prices paid for the performance of the Scope of Work, and no additional
allowance will be made therefor or for additional premiums which may be required by extensions of the policies of
insurance.
20.2.6 It is further understood and agreed by CONTRACTOR that its liability to CITY will not in any way be limited to or affected by the amount of insurance obtained and carried by
CONTRACTOR in connection with this Agreement.
20.2.7 Unless otherwise approved by CITY, if any part of the Scope of Work is subcontracted, the Basic Insurance Requirements must be provided by, or on behalf of, all subcontractors even if CITY has approved lesser insurance requirements for CONTRACTOR, and all subcontractors must agree in writing to be bound by the provisions of this section.
21. INTERPRETATION. Whenever the context so requires, the masculine gender includes the feminine and neuter, and the singular number includes the plural.
22. KEY PERSONNEL. At request of CITY, CONTRACTOR shall name all key personnel to be assigned to the work set forth herein. CITY reserves the right to approve key personnel, which approval shall not be unreasonably withheld. Once the key personnel are approved CONTRACTOR shall not change such personnel without the approval of CITY.
23. LICENSES. CONTRACTOR shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement any licenses, permits and approvals which are legally required for CONTRACTOR to practice its profession and perform the Scope of Work. If CONTRACTOR is a corporation, at least one (1) officer or key employee shall hold the required licenses or professional degrees. If CONTRACTOR is a partnership, at least one (1) partner shall hold the required licensees or professional degrees.
24. MERGER AND MODIFICATION. This Agreement sets forth the entire agreement between the parties and supersedes all other oral or written representations. This Agreement may be modified only in a writing approved by the City Council and signed by all the parties.
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 8
25. NO WAIVER OF DEFAULT. The failure of any party to enforce against another party any provision of this Agreement shall not constitute a waiver of that party's right to enforce such a provision at a later time and shall not serve to vary the terms of this Agreement.
26. NON-INTEREST. No CITY officer or employee shall hold any interest in this Agreement (California Government Code section 1090).
27. NOTICES. All notices relative to this Agreement shall be given in writing and shall be personally served or sent by certified or registered mail and be effective upon actual personal service or depositing in the United States mail. The parties shall be addressed as follows, or at any other address designated by notice:
CITY: CITY OF BAKERSFIELD
CITY HALL
1600 Truxtun Avenue
Bakersfield, California 93301
CONTRACTOR: CALIFORNIA INTERSCHOLASTIC FEDERATION
ATTN: BRIAN SEYMOUR
4658 Duckhorn Drive
Sacramento, California 95834
28. RESOURCE ALLOCATION. All CITY obligations under the terms of this Agreement are subject to the appropriation and allocation of resources by the City Council.
29. SB 854 COMPLIANCE. To the extent Labor Code Section 1771.1 applies to this Agreement, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, be subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5. It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Labor Code Section 1725.5 at the time the contract is awarded. The prime contractor is required to post job site notices in compliance with California Code of Regulations, Title 8, Section 16451. This project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations.
///
///
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 9
30. STANDARD OF PERFORMANCE. The Scope of Work shall be performed in conformity with all legal requirements and industry standards observed by a specialist of CONTRACTOR’s profession in California.
31. STARTING WORK. CONTRACTOR shall not begin work until authorized to do so in writing by CITY. No work will be authorized before the date first written above.
32. TAX NUMBERS.
CONTRACTOR’s Federal Tax ID Number 51-0204405
CONTRACTOR is a corporation? Yes X No
33. THIRD-PARTY CLAIMS. In the case of public works contracts, CITY will timely notify CONTRACTOR of third-party claims relating to this Agreement. CITY shall be allowed to recover from CONTRACTOR, and CONTRACTOR shall pay on demand, all costs of notification.
34. TITLE TO DOCUMENTS. All documents, plans, and drawings, maps, photographs, and other papers, or copies thereof prepared by CONTRACTOR pursuant to the terms of this Agreement, shall, upon preparation, become CITY property.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the date first written above.
"CITY" “CONTRACTOR”
CITY OF BAKERSFIELD CALIFORNIA INTERSCHOLASTIC FEDERATION By:________________________________ By:_________________________________
KAREN GOH RON NOCETTI
Mayor Executive Director
APPROVED AS TO CONTENT:
CITY MANAGER’S OFFICE
By:_______________________________
CHRISTIAN CLEGG
City Manager
APPROVED AS TO FORM: COUNTERSIGNED:
City Attorney:_______________________ Finance Director: _____________________
VIRGINIA GENNARO RANDY MCKEEGAN
Insurance:____________
Attachment(s): Exhibit ”A”: 2027-2031 Tentative Dates
VG/js
S:\Manager\Agrs\26-27\CIF2027 -2031WrestlingChampionshipAgrmt.docx Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CIF 2027-2031 WRESTLING CHAMPIONSHIP AGREEMENT Page 10
EXHIBIT “A”
2027 – 2031 Tentative Dates
Year 2027: February 25 through February 27
Year 2028: February 24 through February 26
Year 2029: February 22 through February 24
Year 2030: February 21 through February 23
Year 2031: February 27 through March 1
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A : NAIC #
NAME: CONTACT
(A/C, No): FAX
E-MAIL ADDRESS:
PRODUCER
(A/C, No, Ext): PHONE
INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR WVDADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.
NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE
ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. *LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LIMITS SHOWN ARE INCLUSIVE OF AMOUNTS REQUESTED BY THE CERTIFICATE HOLDER AND MAY NOT REFLECT POLICY LIMIT AMOUNTS IN EXCESS OF THOSE REQUESTED. *Not Applicable in WY $
$
$
$ PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person) COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS NON-OWNED OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?
(Mandatory in NH) DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEEE.L. EACH ACCIDENT EROTH- STATUTE PER
(MM/DD/YYYY) LIMITS POLICY EXP(MM/DD/YYYY) POLICY EFFLTR TYPE OF INSURANCE POLICY NUMBER INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $ AGGREGATE $
$
OCCUR
CLAIMS-MADE DED RETENTION $
PRODUCTS - COMP/OP AGG $ GENERAL AGGREGATE $ PERSONAL & ADV INJURY $ MED EXP (Any one person) $
EACH OCCURRENCE $ DAMAGE TO RENTED
PREMISES (Ea occurrence) $ COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO- JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE ACORD 25 (2025/12) © 1988-2025 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
9/29/2026
HUB International Midwest Limited
9200 Ward Parkway Suite 500
Kansas City MO 64114
Certificate Department 913-491-6385 816-203-4425 [email protected] State Compensation Insurance Fund of California 35076 CALIINT-03 Arch Insurance Company 11150 California Interscholastic Federation
4658 Duckhorn Drive
Sacramento CA 95834
1852932413
B X 1,000,000 X 1,000,000 5,000 1,000,000 5,000,000 X
Y SBCGL0310209 8/1/2026 8/1/2027
5,000,000
B 1,000,000 X X
SBAUT0039009 8/1/2026 8/1/2027
B X 10,000,000 X
SBFXS0047909 8/1/2026 8/1/2027
10,000,000
A X
N
Y 1935885-26/27 8/1/2026 8/1/2027
1,000,000 1,000,000 1,000,000
City of Bakersfield, its mayor, council, officers, agents, employees and volunteers are Additional Insured as respects the General Liability. Waiver of Subrogation applies in favor of City of Bakersfield, its mayor, council, officers, agents, employees and volunteers as respects Workers Compensation when required by written contract, per policy provisions as allowed by law. City of Bakersfield, CA 1600 Truxtun Ave
Bakersfield CA 93301
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 POLICY NUMBER: SBCGL0310209 COMMERCIAL GENERAL LIABILITY CG 20 261219
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED - DESIGNATED
PERSON OR ORGANIZATION
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
Name Of Additional Insured Person(s) Or Organization(s):
Any person or organization you are required to add as an additional insured to this policy by written contract or written agreement which is currently in effect or coming into effect during the term of this policy; and executed prior to the occurrence of any "property damage", "bodily injury", or "personal and advertising injury''. but only with respect to post-season or play off games conducted by the California Interscholastic Federation ("CIF") and CIF Sections, and their office premises, conducted meetings, conferences, or other nonathletic activities.
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
A. Section II - Who Is An Insured is amended to
include as an additional insured the person(s) or
organization(s) shown in the Schedule, but only
with respect to liability for "bodily injury", "property damage" or "personal and advertising injury"
caused, in whole or in part, by your acts or
omissions or the acts or omissions of those acting
on your behalf:
1. In the performance of your ongoing operations;
or
2. In connection with your premises owned by or
rented to you.
However:
1. The insurance afforded to such additional
insured only applies to the extent permitted by
law; and
2. If coverage provided to the additional insured is
required by a contract or agreement, the
insurance afforded to such additional insured
will not be broader than that which you are
required by the contract or agreement to
provide for such additional insured.
B. With respect to the insurance afforded to these
additional insureds, the following is added to
Section Ill - Limits Of Insurance:
If coverage provided to the additional insured is
required by a contract or agreement, the most we
will pay on behalf of the additional insured is the
amount of insurance:
1. Required by the contract or agreement; or
2. Available under the applicable limits of
insurance;
whichever is less.
This endorsement shall not increase the
applicable limits of insurance.
CG 20 261219 © Insurance Services Office, Inc., 2018 Page 1 of 1 Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A : NAIC #
NAME: CONTACT
(A/C, No): FAX
E-MAIL ADDRESS:
PRODUCER
(A/C, No, Ext): PHONE
INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR WVDADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$ PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person) COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS NON-OWNED OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?
(Mandatory in NH) DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEEE.L. EACH ACCIDENT EROTH- STATUTE PER
(MM/DD/YYYY) LIMITS POLICY EXP(MM/DD/YYYY) POLICY EFFLTR TYPE OF INSURANCE POLICY NUMBER INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $ AGGREGATE $
$
OCCUR
CLAIMS-MADE DED RETENTION $
PRODUCTS - COMP/OP AGG $ GENERAL AGGREGATE $ PERSONAL & ADV INJURY $ MED EXP (Any one person) $
EACH OCCURRENCE $ DAMAGE TO RENTED
PREMISES (Ea occurrence) $ COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO- JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
09/29/2026 American Specialty Insurance & Risk Services, Inc. dba A.S.I.R.S.I. Insurance Agency (CA License #0E72661) 7609 W. Jefferson Blvd., Suite 100 Fort Wayne IN 46804 California Interscholastic Federation 4658 Duckhorn Drive Sacramento CA 95834 Arch Insurance Company 11150 1002527081 A Y Y SBCGL0310209 08/01/2026 08/01/2027 1,000,000 1,000,000 5,000 1,000,000 5,000,000 5,000,000 A SBAUT0039009 08/01/2026 08/01/2027 NON-OWNED/HIRED AUTO 1,000,000 - Coverage applies to the following Insured: CALIFORNIA INTERSCHOLASTIC FEDERATION, 4658 DUCKHORN DRIVE, SACRAMENTO, CA 95834. City of Bakersfield Office of Risk Mangement 1600 Truxtun Ave Bakersfield CA 93301 - The General Liability policy includes Form CG 2135 Exclusion - Coverage C - Medical Payments. Medical Payments coverage applies only to the office locations listed on the policy.
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 EFFECTIVE DATE:
NAMED INSURED
POLICY NUMBER
CARRIER NAIC CODE
AGENCY
LOC #:
AGENCY CUSTOMER ID:
ADDITIONAL REMARKS SCHEDULE Page of
ADDITIONAL REMARKS
FORM NUMBER: FORM TITLE:
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, © 2008 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
ACORD 101 (2008/01)
1 1
American Specialty Insurance & Risk Services, Inc. SBCGL0310209 California Interscholastic Federation 4658 Duckhorn Drive Arch Insurance Company 11150 Sacramento, CA 95834 08/01/2026 ACORD 25 CERTIFICATE OF LIABILITY INSURANCE - Certificate #1002527081 - As per Form CG 2144 Limitation of Coverage to Designated Premises or Project, coverage is applicable only to tournaments conducted by the California Interscholastic Federation ("CIF") and CIF and CIF sections office premises, conducted meetings, conferences or other nonathletic activities. - City of Bakersfield, its mayor, council, officers, agents, employees and volunteers shall be an Additional Insured, but only with respect to the operations of the Named Insured, and subject to the provisions and limitations of Form CG 2026 Additional Insured - Designated Person or Organization, but only with respect to STATE WRESTLING CHAMPIONSHIP FINALS from February 25, 2027 through February 27, 2027. - Additional insured per CG 2026 applies to any person or organization you are required to add as an additional insured to this policy by written contract or written agreement which is currently in effect or coming into effect during the term of this policy; and Executed prior to the occurrence of any "property damage", "bodily injury", or "personal and advertising injury".
- The General Liability policy includes Waiver of Subrogation as per Form 00 SGL0031 00 Commercial General Liability Extension Endorsement. The Waiver of Subrogation applies when required by a written contract executed prior to loss. - The General Liability policy is primary and non-contributory as per Form CG 2001 Primary and Noncontributory - Other Insurance Condition. This applies where required by contract or agreement.
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 CG 20 26 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 POLICY NUMBER:SBCGL0310209 COMMERCIAL GENERAL LIABILITY CG 20 26 12 19
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED – DESIGNATED
PERSON OR ORGANIZATION
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
Name Of Additional Insured Person(s) Or Organization(s):
The City Bakersfield, Its Mayor, Council, Officers, Agents, Employees, and Volunteers Office of Risk Management, 1600 Truxtun Avenue
Bakersfield, CA 93301
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
A. Section II – Who Is An Insured is amended to
include as an additional insured the person(s) or
organization(s) shown in the Schedule, but only
with respect to liability for "bodily injury", "property damage" or "personal and advertising injury"
caused, in whole or in part, by your acts or
omissions or the acts or omissions of those acting
on your behalf:
1. In the performance of your ongoing operations;
or
2. In connection with your premises owned by or
rented to you.
However:
1. The insurance afforded to such additional
insured only applies to the extent permitted by
law; and
2. If coverage provided to the additional insured is
required by a contract or agreement, the
insurance afforded to such additional insured
will not be broader than that which you are
required by the contract or agreement to
provide for such additional insured.
B. With respect to the insurance afforded to these
additional insureds, the following is added to
Section III – Limits Of Insurance:
If coverage provided to the additional insured is
required by a contract or agreement, the most we
will pay on behalf of the additional insured is the
amount of insurance:
1. Required by the contract or agreement; or
2. Available under the applicable limits of
insurance;
whichever is less.
This endorsement shall not increase the
applicable limits of insurance.
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2
BROKER COPY
Endorsement Agreement
Nothing in this endorsement shall be held to vary, alter, waive or extend any of the terms, conditions, agreements, or limitations of this policy other than as above stated.Nothing elsewhere in this policy shall be held to vary, alter, waive or limit the terms, conditions, agreements or limitations in this endorsement.
Countersigned and Issued at San Francisco September 29, 2026 2570 Authorized Representative President and CEO SF – END Rev. 2/2025 OLD DP 217
Waiver of Subrogation
1935885-2026
Home Office Renewal
San Francisco NA
All Effective Dates are 4-22-28-92
at 12:01 AM Pacific Page 1 of 1
Standard Time or the
Time Indicated at Effective September 29, 2026 at 12:01 AM Pacific Standard Time and Expiring August 1, 2027 at 12:01 AM
CALIFORNIA INTERSCHOLASTIC FEDERAT
4658 DUCKHORN DR
SACRAMENTO, CA 95834
Anything in this policy to the contrary notwithstanding, it is agreed that the State Compensation Insurance Fund waives any right of subrogation against, City of Bakersfield
which might arise by reason of any payment under this policy in connection with work performed by,
CALIFORNIA INTERSCHOLASTIC FEDERAT
It is further agreed that the insured shall maintain payroll records accurately segregating the remuneration of employees while engaged in work for the above employer.
It is further agreed that premium on the earning of such employees shall be increased by
3.00%.
Docusign Envelope ID: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 IT’S BIGGER THAN SPORTS. THE CIF PROVIDES STUDENTS WITH THE OPPORTUNITY TO BELONG, CONNECT AND COMPETE IN EDUCATION-BASED EXPERIENCES.
October 26, 2026
CITY OF BAKERSFIELD
OFFICE OF RISK MANAGEMENT
1600 Truxtun Avenue
Bakersfield, CA 93301
To whom it may concern,
The CIF is a recognized 501.C.3 organization located in Sacramento, CA. Pursuant to the Certificate of Insurance and Additional Insured Endorsement requested by the City of Bakersfield, we do not have Automotive Liability Coverage, as we do not own or operate any business motor vehicles.
Respectfully,
Brian Seymour
Associate Executive Director
Certificate Of Completion
Envelope Id: 127FFE27-AD9D-8300-81E1-9FFEE3B46CF2 Status: Completed Subject: Complete with Docusign: CIF2027 -2031 WrestlingChampionshipAgr Final MHH.pdf, City of Bakersfie...
Source Envelope:
Document Pages: 16 Signatures: 1 Envelope Originator:
Certificate Pages: 4 Initials: 0 City Clerk's Office
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
[email protected]
IP Address: 174.46.226.5
Record Tracking
Status: Original
10/27/2026 2:28:35 PM
Holder: City Clerk's Office
[email protected]
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Signer Events Signature Timestamp
Ron Nocetti
[email protected]
Executive Director
Security Level: Email, Account Authentication
(None) Signature Adoption: Drawn on Device
Using IP Address: 96.71.198.221
Sent: 10/27/2026 2:32:51 PM
Viewed: 10/27/2026 7:25:36 PM
Signed: 10/28/2026 7:13:26 AM
Electronic Record and Signature Disclosure:
Accepted: 10/27/2026 7:25:36 PM
ID: 24c071ce-90ee-401b-984d-29813e38e058
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 10/27/2026 2:32:51 PM
Certified Delivered Security Checked 10/27/2026 7:25:36 PM Signing Complete Security Checked 10/28/2026 7:13:26 AM Completed Security Checked 10/28/2026 7:13:26 AM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City of Bakersfield (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system.
Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us.
All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/28/2022 10:51:05 AM Parties agreed to: Ron Nocetti
Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us.
How to contact City of Bakersfield:
You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows:
To contact us by email send messages to: [email protected] To advise City of Bakersfield of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at [email protected] and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address.
If you created a DocuSign account, you may update it with your new email address through your account preferences.
To request paper copies from City of Bakersfield
To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to [email protected] and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any.
To withdraw your consent with City of Bakersfield
To inform us that you no longer wish to receive future notices and disclosures in electronic format you may:
i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to [email protected] and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process..
Required hardware and software
The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide-signing-system-requirements.
Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.
By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:
You can access and read this Electronic Record and Signature Disclosure; and You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and
Until or unless you notify City of Bakersfield as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Bakersfield during the course of your relationship with City of Bakersfield.
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Phillip Burns, Development Services Director
DATE: October 12, 2026
SUBJECT: Agreement with Mercy House (not to exceed $639,976.58 in HUD funding in the amount of $469,546.58 in HOME Investment Partnership program (HOME) funds and $170,430 in Community Development Block Grant (CDBG) administration funds (for a not to exceed $639,976.58) to administer the Tenant-Based Rental Assistance program (TBRA).
RECOMMENDATION:
Staff recommends approval of the agreement.
BACKGROUND:
On June 24, 2026, City Council approved the City of Bakersfield’s Fiscal Year (FY) 2026-2027 U.S.
Department of Housing and Urban Development (HUD) Department Action Plan, which outlines the activities to be funded through the City’s HUD entitlement grant programs. As part of that approval, the City allocated $469,546.58 in HOME Investment Partnership program (HOME) funding to Mercy House to administer the Tenant-Based Rental Assistance (TBRA) Program, along with $170,430 in Community Development Block Grant (CDBG) funding to support program administration.
The TBRA Program provides rental assistance to eligible low-income households, who are at risk of losing their housing or experiencing homelessness. Assistance may include rental payments, security and utility deposits, housing search assistance, and housing stabilization services. The program is anticipated to assist a minimum of 34 eligible households in Bakersfield and will remain in effect through June 30, 2028.
Mercy House specializes in homelessness prevention and has extensive experience administering housing assistance programs. The organization is well-qualified to deliver comprehensive services, including homelessness prevention support for families who are at risk of losing access to permanent housing. Through these efforts, Mercy House works proactively to stabilize households and prevent experiences of homelessness.
This agreement provides $469,546.58 in HOME funding for rental assistance and related eligible services and $170,430 in CDBG funding for program administration, for a total of $639,976.58.
FISCAL IMPACT:
The action to approve this agreement will have no impact on the General Fund. HOME and CDBG funds are Federal Entitlement grant funds that were allocated in FY 2026-2027 budget, those entitlement funds will be used to completely carry out this contract.
COUNCIL GOAL:
Safety and Resilience
Innovative and Efficient City Government
ATTACHMENT:
Agreement
26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 1
AGREEMENT NO. ___________________
AGREEMENT WITH MERCY HOUSE
HOME – TENANT BASED RENTAL ASSISTANCE PROGRAM
This AGREEMENT (“Agreement”) is made and entered into on _______________________, by and between the CITY OF BAKERSFIELD, a municipal corporation (referred to herein as “CITY”), and MERCY HOUSE a California non-profit public-benefit corporation authorized to do business in California (referred to herein as “CONTRACTOR”). CITY and CONTRACTOR are collectively referred to as “Parties” herein.
R E C I T A L S
WHEREAS, CITY is a recipient of funds from the United States Department of Housing and Urban Development (referred to herein as “HUD”) under the Cranston-Gonzalez National Affordable Housing Act, Pub. L. No. 101-625, which by Title II created the HOME Investment Partnerships Program (referred to herein as “HOME Program”), having the Catalog of Federal Domestic Assistance number
14.239; and
WHEREAS, HOME Program is a federal program that provides funding to eligible jurisdictions to be used exclusively to provide affordable housing activities to benefit low-income households. As used herein, the HOME Program includes the HUD Final Rule set forth at 78 FR 142, adopted July 24, 2013, which adopts substantial amendments to the HOME Program regulations set forth at 24 CFR Part 92; and
WHEREAS, the HOME Program provides that CITY will certify and contract with eligible public and private non-profit agencies for projects and programs to develop housing, rehabilitate housing, or otherwise assist in providing affordable housing to meet the needs of lower income households throughout CITY; and WHEREAS, CITY is a recipient of funds from HUD under Title I of the Housing and Community Development Act of 1974, and amendments thereto (referred to herein as “Act”), as administrator of the Community Development Block Grant (referred to herein as “CDBG”) having the Catalog of Federal Domestic Assistance number 14.218; and
WHEREAS, CDBG is a federal program that provides funding to eligible jurisdictions to be used exclusively to provide activities to benefit low-income households pursuant to 24 CFR Part 570; and
WHEREAS, on November 4, 2025, CITY issued a Notice of Funding Availability requesting applications for eligible HOME Program and CDBG projects for the Fiscal Year (“FY”) 2026-27 Action Plan; and
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 2
WHEREAS, CONTRACTOR submitted an application requesting HOME Program funds to implement a Tenant-Based Rental Assistance (“TBRA Program”) serving eligible low-income households within the City of Bakersfield (“Program”) and CITY desires to assist CONTRACTOR with a portion of the costs associated with providing Program within CITY; and
WHEREAS, CONTRACTOR also requested CDBG funding to support eligible administrative and operating costs directly associated with implementation of the Program; and
WHEREAS, as part of CITY’s approved FY 2026-27 HUD Action Plan, four hundred sixty-nine thousand five hundred forty-six dollars and fifty-eight cents ($469,546.58) in HOME Program funds and one hundred seventy thousand four hundred thirty dollars ($170,430.00) in CBDG funds (“GRANT” or “Grant Funding”) was set aside for Program; and
WHEREAS, CONTRACTOR possesses the experience, personnel, and capacity necessary to administer Program activities that serve low- and moderate-income households within CITY; and
WHEREAS, CITY shall not be obligated to disburse, or pay to, CONTRACTOR or any third party, any funds until and after CITY receives Funding from HUD.
NOW, THEREFORE, incorporating the foregoing recitals herein, CITY and CONTRACTOR mutually agree as follows:
1. OBJECTIVE.
1.1 HOME Program Activities. CONTRACTOR certifies that all activities funded with HOME Program funds shall comply with 24 CFR Part 92, including Section 92.209 governing TBRA Program.
1.2 CDBG Activities. CONTRACTOR certifies that CDBG funds provided under this Agreement shall be used only for eligible administrative and operational costs directly associated with implementation of the TBRA Program, as set forth in the Scope of Work and in accordance with applicable CDBG requirements under 24 CFR Part 570.
2. SCOPE OF WORK. In exchange for the Compensation (defined below), CONTRACTOR shall be responsible for administering a TBRA Program as set forth in Exhibit "A" attached hereto and incorporated by reference herein.
3. COMPENSATION/PAYMENT PROCEDURE. Subject to the conditions of this section, and Exhibit B attached hereto and incorporated by reference herein, CITY will reimburse CONTRACTOR as follows for performing the Scope of Work (“Compensation”):
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 3
(1) A total not to exceed FOUR HUNDRED SIXTY-NINE
THOUSAND FIVE HUNDRED FORTY-SIX DOLLARS AND FIFTY-EIGHT CENTS ($469,546.58) in HOME Program funds and
ONE HUNDRED SEVENTY THOUSAND FOUR HUNDRED THIRTY
DOLLARS ($170,430.00) in CDBG funds.
CITY will reimburse CONTRACTOR within thirty (30) days after CONTRACTOR submits an itemized invoice for the portions of the Scope of Work completed and that invoice is approved by CITY. The Compensation will be the total amount paid to CONTRACTOR for performing the Scope of Work and includes, but is not limited to, all out-of-pocket costs and taxes.
CITY will pay no other compensation to CONTRACTOR. In no case will CITY compensate CONTRACTOR more than $639,976.58 for performing the Scope of Work.
4. TERM. Unless terminated sooner as set forth herein, this Agreement shall terminate on June 30, 2028.
5. TERMINATION. Either Party may terminate this Agreement after giving the other Party written notice, as provided herein, ten (10) days before the termination is effective.
6. CONDITIONS OF PROGRAM.
6.1 CONTRACTOR shall, at CONTRACTOR’s sole cost, comply with the regulations set forth in 24 CFR Part 92.
6.2 CONTRACTOR shall, at CONTRACTOR’s sole cost, comply with the requirements set forth in 24 CFR 570, 24.
6.3 CONTRACTOR shall administer the TBRA Program in accordance with applicable HUD requirements and the goals established by CITY.
CONTRACTOR shall use best efforts to provide TBRA assistance and related services to a minimum of thirty-four (34) eligible households during the term of this Agreement. Performance shall be measured by the number of households assisted, maintenance of eligibility documentation, timely delivery of assistance, compliance with applicable federal regulations, and submission of required reports and records to CITY.
6.4 CONTRACTOR is participating in a local Continuum of Care (“CoC”) and covered by a CoC which has implemented a discharge plan preparing policies and protocols for the discharge of persons from publicly funded institutions or systems of care (such as health care facilities, foster care or other youth facilities, or correction programs and institutions) in order to prevent such discharge from immediately resulting in homelessness for such persons.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 4
6.5 CONTRACTOR will collect and evaluate data to be entered into the Homeless Management Information System (“HMIS”). The data will be entered into a local HMIS using HUD’s standards for participation.
6.6 The data which includes the numbers served and amount of funding used per client must be entered into HMIS and provided to CITY on a timely quarterly basis during the 2026-27 FY. The initial performance report is to be received by CITY staff no later than October 31, 2026, and quarterly thereafter, January 31, 2027, April 30, 2027, with a final cumulative report July 31, 2027; or, until funding is fully expended.
6.7 HOME Program funds shall not be used to reimburse CONTRACTOR for administrative expenses except to the extent such costs are eligible TBRA costs under applicable HOME Program requirements.
This provision does not prohibit reimbursement of eligible administrative and operational costs from the CDBG funds provided under this Agreement in accordance with Exhibit “A.”
6.8 CONTRACTOR is required to have errors and omissions insurance, which will protect CITY in the event of professional errors or omissions by CONTRACTOR.
6.9 CONTRACTOR is aware that information may come into
CONTRACTOR’s possession which may impact CITY’s legal position in the event such information was released to outside parties
6.10 CONTRACTOR shall retain all financial records, supporting documents, statistical records, and all other records pertinent to the Agreement for a period of five (5) years after the period of subsidy payments terminates. Notwithstanding the above, if there are litigation matters, claims, audits, negotiations or other actions that involve any of the records cited and that have started before the expiration of the five-year period, then all pertinent records must be retained until completion of the actions and resolution of all issues, or the expiration of the five-year period, whichever occurs later.
6.11 CONTRACTOR shall maintain client data demonstrating client eligibility for services provided. Such information should include, but not be limited to, client name, address, income level, or other basis for determining eligibility, and description of service provided.
CONTRACTOR shall also collect and maintain data regarding race, ethnicity, female head of household, and disability status of clients.
Such information shall be submitted to CITY or its designees for review on a quarterly basis using the activity beneficiary report or alternative form approved by CITY attached hereto as Exhibit “E” and incorporated by reference herein.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 5
6.12 Miscellaneous. CONTRACTOR shall execute Exhibit “C” and Exhibit “D” attached hereto and incorporated by reference herein, demonstrating compliance with certain regulation provisions.
7. ACCOUNTING RECORDS. CONTRACTOR shall maintain accurate accounting records and other written documentation pertaining to all costs incurred in performance of this Agreement. Such records and documentation shall be kept at CONTRACTOR's office during the term of this Agreement, and for a period of three (3) years from the date of the final payment hereunder, and made available to CITY representatives upon request at any time during regular business hours.
8. ASSIGNMENT. Neither this Agreement nor any rights, interests, duties, liabilities, obligations or responsibilities arising out of, concerning or related in any way to this Agreement (including, but not limited to, accounts, actions, causes of action, claims, damages, demands, liabilities, losses, obligations, or reckonings of any kind or nature whatsoever, for compensatory or exemplary and punitive damages, or declaratory, equitable or injunctive relief, whether based on contract, equity, tort or other theories of recovery provided for by the common or statutory law) may be assigned or transferred by any Party. Any such assignment is prohibited, and shall be unenforceable and otherwise null and void without the need for further action by the non-assigning Party or parties.
9. BINDING EFFECT. The rights and obligations of this Agreement shall inure to the benefit of, and be binding upon, the parties to the Agreement and their heirs, administrators, executors, personal representatives, successors and assigns.
10. COMPLIANCE WITH ALL LAWS. CONTRACTOR shall, at CONTRACTOR’s sole cost, comply with all of the requirements of municipal, state, and federal authorities now in force, or which may hereafter be in force, pertaining to this Agreement, and shall faithfully observe in all activities relating to or growing out of this Agreement all municipal ordinances and state and federal statutes, rules or regulations, and permitting requirements now in force or which may hereafter be in force including, without limitation, obtaining a City of Bakersfield business tax certificate (Bakersfield Municipal Code Chapter 5.02) where required.
11. CORPORATE AUTHORITY. Each individual signing this Agreement on behalf of entities represents and warrants that they are, respectively, duly authorized to sign on behalf of the entities and to bind the entities fully to each and all of the obligations set forth in this Agreement. ///
///
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 6
12. COUNTERPARTS. This Agreement may be executed in any number of counterparts, each of which shall be considered as an original and be effective as such.
13. DIRECTION. CONTRACTOR retains the right to control or direct the manner in which the services described herein are performed.
14. EQUIPMENT. CONTRACTOR will supply all equipment, tools, materials and supplies necessary to perform the services under this Agreement.
15. EXECUTION. This Agreement is effective upon the date first written above and is the product of negotiation and all parties are equally responsible for authorship of this Agreement. Section 1654 of the California Civil Code shall not apply to the interpretation of this Agreement.
16. EXHIBITS. In the event of a conflict between the terms, conditions or specifications set forth in this Agreement and those in exhibits attached hereto, the terms, conditions, or specifications set forth in this Agreement shall prevail. All exhibits to which reference is made in this Agreement are deemed incorporated in this Agreement, whether or not actually attached.
17. FURTHER ASSURANCES. Each Party shall execute and deliver such papers, documents, and instruments, and perform such acts as are necessary or appropriate, to implement the terms of this Agreement and the intent of the parties to this Agreement.
18. GOVERNING LAW. The laws of the State of California will govern the validity of this Agreement and its interpretation and performance. Any litigation arising in any way from this Agreement shall be brought in Kern County, California.
19. INCLUDED DOCUMENTS. Any bid documents, including, without limitation, special provisions and standard specifications and any Request for Proposals, Request for Qualifications and responses thereto relating to this Agreement are incorporated by reference as though fully set forth herein.
20. INDEMNITY. CONTRACTOR shall indemnify, defend, and hold harmless CITY and CITY’s officers, agents and employees against any and all liability, claims, actions, causes of action or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, arising out of, connected with, or caused by CONTRACTOR or CONTRACTOR’s employees, agents, independent contractors, companies, or subcontractors in the performance of, or in any way arising from, the terms and provisions of this Agreement whether or not caused in part by a Party indemnified hereunder, except for CITY’s sole active negligence or willful misconduct.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 7
21. INDEPENDENT CONTRACTOR. This Agreement calls for CONTRACTOR’s performance of the Scope of Work as an independent contractor.
CONTRACTOR is not an agent or employee of CITY for any purpose and is not entitled to any of the benefits provided by CITY to its employees. This Agreement shall not be construed as forming a partnership or any other association with CONTRACTOR other than that of an independent contractor.
22. INSURANCE.
22.1 Types and Limits of Insurance. In addition to any other insurance or security required under this Agreement, CONTRACTOR must procure and maintain, for the duration of this Agreement, the types and limits of insurance below ("Basic Insurance Requirements").
22.1.1 Automobile liability insurance, providing coverage for owned, non-owned, and hired autos on an occurrence
basis for bodily injury, including death, of one or more persons, property damage, and personal injury, with limits of not less than $1,000,000 per occurrence.
22.1.2 Commercial general liability insurance, unless otherwise approved by CITY’s Risk Manager, providing coverage on
an occurrence basis for bodily injury, including death, of one or more persons, property damage, and personal
injury, with limits of not less than $1,000,000 per occurrence.
The policy must:
22.1.2.1 Provide contractual liability coverage for the terms of this Agreement;
22.1.2.2 Provide products and completed operations
coverage;
22.1.2.3 Provide premises, operations, and mobile
equipment coverage; and
22.1.2.4 Contain an additional insured endorsement in
favor of CITY and its mayor, council, officers,
agents, employees, and designated volunteers.
22.1.3 Workers' compensation insurance with limits of not less than $1,000,000 per occurrence. In accordance with the
provisions of Labor Code Section 3700, every contractor will be required to secure the payment of compensation to his employees. Pursuant to Labor Code Section 1861,
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 8
CONTRACTOR must submit to CITY the following
certification before beginning any work on the
Improvements:
I am aware of the provisions of Section 3700 of the
Labor Code which require every employer to be
insured against liability for worker’s compensation or
to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such
provisions before commencing the performance of
the work of this contract.
By executing this Agreement, CONTRACTOR is submitting the certification required above.
The policy must contain a waiver of subrogation in favor of CITY and its mayor, council, officers, agents, employees, and designated volunteers.
22.2 General Provisions Applying to All Insurance Types.
22.2.1 All policies required of CONTRACTOR must be written on a first-dollar coverage basis, or contain a deductible
provision. Subject to CITY’s advance approval,
CONTRACTOR may utilize a self-insured retention in any or all of the policies provided, but the policy or policies may not contain language, whether added by endorsement or
contained in the policy conditions, that prohibits
satisfaction of any self-insured provision or requirement by anyone other than the named insured or by any means
including other insurance or which is intended to defeat the intent or protection of an additional insured.
22.2.2 All policies required of CONTRACTOR must be primary insurance as to CITY and its mayor, council, officers, agents, employees, or designated volunteers and any insurance or self-insurance maintained by CITY and its mayor, council, officers, agents, employees, and designated volunteers
must be excess of CONTRACTOR’s insurance and must not
contribute with it.
22.2.3 The insurance required above, except for workers’ compensation insurance, must be placed with insurers with a Best’s rating as approved by CITY’s Risk Manager, but in no event less than A-:VII. Any deductibles, self-insured retentions, or insurance in lesser amounts, or lack of certain types of insurance otherwise required by this Agreement, or Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 9
insurance rated below Best’s A-:VII, must be declared prior to execution of this Agreement and approved by CITY in
writing.
22.2.4 The insurance required in this section must be maintained until the Scope of Work is satisfactorily completed as
evidenced by CITY’s written acceptance. All policies must provide that there will be continuing liability thereon, notwithstanding any recovery on any policy.
22.2.5 Full compensation for all premiums which CONTRACTOR is required to pay to satisfy the Basic Insurance Requirements shall be considered as included in the prices paid for the performance of the Scope of Work, and no additional
allowance will be made therefor or for additional premiums which may be required by extensions of the policies of
insurance.
22.2.6 It is further understood and agreed by CONTRACTOR that its liability to CITY will not in any way be limited to or affected by the amount of insurance obtained and carried by
CONTRACTOR in connection with this Agreement.
22.2.7 Unless otherwise approved by CITY, if any part of the Scope of Work is subcontracted, the Basic Insurance Requirements must be provided by, or on behalf of, all subcontractors even if CITY has approved lesser insurance requirements for CONTRACTOR, and all subcontractors must agree in writing to be bound by the provisions of this section.
23. INTERPRETATION. Whenever the context so requires, the masculine gender includes the feminine and neuter, and the singular number includes the plural.
24. KEY PERSONNEL. At request of CITY, CONTRACTOR shall name all key personnel to be assigned to the work set forth herein. CITY reserves the right to approve key personnel, which approval shall not be unreasonably withheld. Once the key personnel are approved CONTRACTOR shall not change such personnel without the approval of CITY.
25. LICENSES. CONTRACTOR shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement any licenses, permits and approvals which are legally required for CONTRACTOR to practice its profession and perform the Scope of Work. If CONTRACTOR is a corporation, at least one (1) officer or key employee shall hold the required licenses or professional degrees. If CONTRACTOR is a partnership, at least one (1) partner shall hold the required licensees or professional degrees.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 10
26. MERGER AND MODIFICATION. This Agreement sets forth the entire agreement between the parties and supersedes all other oral or written representations. This Agreement may be modified only in a writing approved by the City Council and signed by all the parties.
27. NO WAIVER OF DEFAULT. The failure of any Party to enforce against another Party any provision of this Agreement shall not constitute a waiver of that Party's right to enforce such a provision at a later time and shall not serve to vary the terms of this Agreement.
28. NON-INTEREST. No CITY officer or employee shall hold any interest in this Agreement (California Government Code section 1090).
29. NOTICES. All notices relative to this Agreement shall be given in writing and shall be personally served or sent by certified or registered mail and be effective upon actual personal service or depositing in the United States mail. The parties shall be addressed as follows, or at any other address designated by notice:
CITY: CITY OF BAKERSFIELD
Community Development Division
1600 Truxtun Avenue, Third Floor
Bakersfield, California 93301
CONTRACTOR: MERCY HOUSE
P.O. Box 1905
Santa Ana, CA 92702
30. RESOURCE ALLOCATION. All CITY obligations under the terms of this Agreement are subject to the appropriation and allocation of resources by the City Council.
31. SB 854 COMPLIANCE. To the extent Labor Code Section 1771.1 applies to this Agreement, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, be subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5. It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Labor Code Section 1725.5 at the time the contract is awarded. The prime contractor is required to post job site notices in compliance with California Code of Regulations, Title 8, Section 16451. This project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House Page 11
32. STANDARD OF PERFORMANCE. The Scope of Work shall be performed in conformity with all legal requirements and industry standards observed by a specialist of CONTRACTOR’s profession in California.
33. STARTING WORK. CONTRACTOR shall not begin work until authorized to do so in writing by CITY. No work will be authorized before the date first written above.
34. TAX NUMBERS.
CONTRACTOR’s Federal Tax ID Number 33-0315864
CONTRACTOR is a corporation? Yes X No
(Please check one.)
35. THIRD-PARTY CLAIMS. In the case of public works contracts, CITY will timely notify CONTRACTOR of third-party claims relating to this Agreement. CITY shall be allowed to recover from CONTRACTOR, and CONTRACTOR shall pay on demand, all costs of notification.
36. TITLE TO DOCUMENTS. All documents, plans, and drawings, maps, photographs, and other papers, or copies thereof prepared by CONTRACTOR pursuant to the terms of this Agreement, shall, upon preparation, become CITY property.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the date first written above.
"CITY" “CONTRACTOR”
CITY OF BAKERSFIELD MERCY HOUSE
By:________________________________ By:_________________________________
KAREN GOH LARRY HAYNES
Mayor Chief Executive Officer
APPROVED AS TO CONTENT:
DEVELOPMENT SERVICES DEPARTMENT
By:_______________________________
PHILLIP BURNS
Director
APPROVED AS TO FORM: COUNTERSIGNED:
City Attorney:________________________ Finance Director: ________________________
VIRGINIA GENNARO RANDY MCKEEGAN
Insurance:___________
Attachment(s): Exhibit A Exhibit C Exhibit E
Exhibit B Exhibit D
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House A - 1
EXHIBIT “A”
HOME PROGRAM - INVESTMENT PARTNERSHIPS PROGRAM (HOME-TBRA) AND
COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM ADMINISTRATION SUPPORT
PURPOSE
CONTRACTOR will administer a Tenant-Based Rental Assistance (TBRA) program to prevent and alleviate homelessness by providing financial rental support and related services to low-income households in Bakersfield. The program is designed to promote housing stability and self-sufficiency for individuals and families earning at or below 60% of the Area Median Income (AMI), who are at risk of losing their housing or experiencing homelessness. By addressing the immediate barriers to affordable housing, the program supports long-term improvements in quality of life and community well-being.
PROGRAM DESCRIPTION
A. HOME-TBRA ACTIVITIES
MERCY HOUSE shall administer a HOME-Tenant-Based Rental Assistance Program in accordance with 24 CFR Part 92, including Section 92.209.
Eligible activities may include:
1. Determination of participant eligibility and income verification;
2. Tenant intake, assessment, and program enrollment;
3. Rental assistance payments to participating landlords on behalf of eligible households;
4. Security deposits and utility deposits, where permitted by HOME PROGRAM regulations;
5. Housing stabilization services directly related to participation in the TBRA Program;
6. Housing search and placement assistance;
7. Ongoing participant monitoring and recertification;
8. Housing inspections and habitability determinations as required by HUD regulations;
9. Maintenance of participant files and required program documentation;
10. HMIS participation and reporting, where required; and
11. Other eligible TBRA activities authorized by HUD and approved by CITY.
MERCY HOUSE shall use best efforts to provide assistance to a minimum of thirty-four (34) eligible households during the term of this Agreement.
B. CDBG-FUNDED PROGRAM ADMINISTRATION
CDBG funds provided under this Agreement shall be used solely for eligible administrative and operational costs directly associated with implementation of the HOME-TBRA Program. No CDBG funds shall be used for activities prohibited under federal law or for expenses not directly attributable to administration of the HOME-TBRA Program.
CONTRACTOR shall maintain documentation sufficient to identify costs charged to each funding source. No cost may be charged to both HOME PROGRAM and CDBG funds, and costs shall be charged only to the funding source for which the cost is eligible.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House A - 2
FUNDING
The maximum funding available under this Agreement shall be no more than ($469,546.58) in HOME PROGRAM funds and ($170,430.00) in CDBG funds for a total award not to exceed ($639,976.58).
For reimbursement requests involving more than one funding source, CONTRACTOR shall separately identify costs charged to HOME PROGRAM and CDBG and provide supporting documentation sufficient for CITY to determine the eligibility of each cost under the applicable funding source.
TIME FRAME
Unless terminated sooner as set forth herein, this Agreement shall terminate on June 30, 2028.
All HOME PROGRAM and CDBG funds shall be expended only for eligible costs incurred during the Agreement term and in accordance with HUD regulations and CITY requirements.
PERFORMANCE MEASURES
MERCY HOUSE shall:
1. Maintain compliance with all HOME Program requirements contained in 24 CFR Part 92;
2. Maintain compliance with all applicable CDBG requirements contained in 24 CFR Part 570;
3. Provide TBRA assistance to eligible low-income households residing within the City of Bakersfield;
4. Maintain complete participant files documenting eligibility and services provided;
5. Submit all reports required by CITY, HUD, and other applicable agencies;
6. Cooperate with CITY monitoring and audit activities; and
7. Maintain records demonstrating that CDBG-funded expenditures are directly related to administration of the HOME-TBRA Program.
REPORTING
MERCY HOUSE shall submit reports in a form acceptable to CITY, including but not limited to:
1. Quarterly expenditure performance reports;
2. HMIS reports, where applicable;
3. Activity Beneficiary Reports utilizing Exhibit E or another CITY-approved reporting format;
4. Program income reports, if applicable; and
5. Any additional documentation reasonably required by CITY or HUD.
All records shall be maintained in accordance with the record retention requirements contained in the Agreement and applicable federal regulations.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House B - 1
EXHIBIT “B”
INVOICING AND BUDGET DETAIL
1. INVOICE PACKAGES.
1.1 No disbursement under this Agreement will be made except (a) after CONTRACTOR’s Executive Director and Financial Manager(s) attend a Contract Workshop conducted by CITY, and (b), upon receipt of an acceptable “CONTRACTOR Payment Request” duly executed by or on behalf of the CONTRACTOR. The CONTRACTOR must execute all Payment Request forms. A completed CONTRACTOR Payment Request form must accompany all invoice packages. All invoice packages shall be submitted to the CITY’s Economic and Community Development Department not to exceed one invoice package per month and in the minimum amount of $500.00 except for the final funding draw invoice. Each month’s Payment Request shall be for a one calendar month period of time such as July, August, September, etc. The address for submittal is:
City of Bakersfield
Community Development Division
1600 Truxtun Avenue, Third Floor
Bakersfield, CA 93301
1.2 Payment of any invoice shall be made only after receiving a complete, adequately supported, properly documented, and accurately addressed invoice. Invoices received by CITY that are not consistent with the approved format will be cause for an invoice to be disputed. In the event of an invoice dispute, CITY will notify the CONTRACTOR by initiating an “Invoice Dispute Notification” form.
Payment will not be made until the dispute is resolved and a corrected invoice submitted. Failure to use the address exactly as provided above may result in return of the invoice to the CONTRACTOR. Payment shall be deemed complete upon deposit of the payment, properly addressed, postage prepaid, in the United States mail. All invoices must be approved by CITY.
1.3 Notwithstanding any other provision of this Agreement, no disbursement shall be required at any time or in any manner which is in violation of or in conflict with federal or state laws, rules, or regulations.
1.4 CONTRACTOR shall provide proof of payment to CITY for each invoice submitted for payment under this Grant. If the CONTRACTOR is not able to demonstrate proof of payment, CITY, at its discretion, may not issue a check.
1.5 The invoice shall contain the following information:
1.5.1 The word “INVOICE” and a sequential invoice number should Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House B - 2
appear in a prominent location at the top of the page(s); and,
1.5.2 Printed name of the service provider or contractor, along with business address, including P.O. Box, City, State, and Zip Code and Telephone Number; and,
1.5.3 Printed name of the CONTRACTOR, along with business address, including P.O. Box, City, State, and Zip Code and Telephone Number; and,
1.5.4 The date of the invoice along with the number of the Agreement upon which the invoice is based; and,
1.5.5 All subcontractor invoices must be listed on the invoice; a copy of the subcontractor invoice should be attached to the service provider/contractor’s invoice; and,
1.5.6 A brief description of the work performed, including dates of performance and the name or initials of the person performing the work; and,
1.5.7 The method of computing the amount due. Invoices must be itemized based on the tasks specified in the Agreement; and,
1.5.8 The total amount due; this should be in a prominent location in the lower right-hand portion of the last page and clearly distinguished from other figures or computations appearing on the invoice; the total amount due shall include all costs incurred by the CONTRACTOR under the terms of this
Agreement; and
1.6 The following items will not be allowed:
1.6.1 Late fees, gambling debts, debts of Board Members, invoices for which no dollar amount due on payments shows on the invoice, submissions of payment requests which do not
balance, donations, Bingo game expenses, and expenses
related to raffles and any other game of chance.
1.6.2 Proof of payment must be provided with invoice and CONTRACTOR payment request. Proof of payment may be a
copy of an issued or cancelled check or copy of credit card payment.
1.6.3 Identifying information about CONTRACTOR employees or volunteers other than employee or volunteer names.
Information such as Social Security numbers and addresses of employees or volunteers should not be included.
1.7 Original signature and date (in ink) of CONTRACTOR or its authorized representative on the CONTRACTOR payment request.
1.8 Final invoice shall be clearly marked ‘FINAL INVOICE’ and be submitted along with supporting documentation within the time as designated within the terms of the agreement.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House B - 3
2. BUDGET CLAUSE.
The amount will not exceed the amount as stated in the compensation section of the Agreement.
If funding for any fiscal year is reduced or deleted by HUD for purposes of the program, CITY shall have the option to either cancel this Agreement with no liability occurring to CITY or offer an Agreement amendment to CONTRACTOR to reflect the reduced amount. Updated budget information shall be provided at the request of CITY.
3. PAYMENT OF COSTS.
CONTRACTOR agrees that it will provide for payment of its operating costs and that all costs connected with the facility will be paid by the CONTRACTOR on a timely basis.
4. AUDIT DISALLOWANCES.
CONTRACTOR agrees it shall return any audit disallowances funding to CITY.
Read and Agreed by Executive Director: ______________________________________ CONTRACTOR Name: MERCY HOUSE
Date:_________________________________
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House B - 4
CONTRACTOR INVOICE
Payment Reimbursement Request
Grant Funding
Circle Grant Type
Community Development
Block Grant
(CDBG)
Emergency Solutions Grant
(ESG)
HOME – Tenant Based
Rental Assistance
(HOME - TBRA)
Public Safety Vital
Services
(PSVS)
Agreement No: Purchase Order No: Payment Request No: Invoice No:
To: City of Bakersfield
Community Development Division
Attn: Homelessness Services
Address:
1600 Truxtun Ave, Third Floor
Bakersfield, Ca 93301
From:
Mailing Address:
Grant Award Amount:
Reimbursement Requested:
Program Income: $
I have reviewed and certify the allowable costs associated with this payment request reimbursement submittal were paid for with available funding and any match requirements have been met. In addition, I certify that all financial obligations are met, and services are provided to intended clients.
Contractor Representative Date
Signature
Contractor Representative
Printed Name
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House B - 5
CONTRACTOR PAYMENT REQUEST
DISPUTE NOTIFICATION FORM
Name of CONTRACTOR:
_____________________________________________
Address of CONTRACTOR:
_____________________________________________
_____________________________________________
_____________________________________________
Date Payment Request Received: ________________________________ Date Payment Request Declined: _________________________________ Reason for Decline/Dispute:
__________________________________________________________________ __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ Reviewed By:____________________________________________________ Title:_____________________________________________________________ Dated:___________________________________________________________ Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House C - 1
EXHIBIT “C”
CERTIFICATION REGARDING LOBBYING
The undersigned certifies, to the best of his or her knowledge and belief, that:
(1) No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. (3) The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontractors, sub-grants, and contracts under grants, loans, and cooperative agreements) and that all sub-recipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Executive Director Date
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House D - 1
EXHIBIT “D”
DRUG FREE WORKPLACE CERTIFICATION
The undersigned certifies, to the best of his or her knowledge and belief, that:
CONTRACTOR, representing the facility known as
________________________________ located at _________________________________ will continue to provide a drug-free workplace by meeting all standards and requirements of the Code of Federal Regulations, Part 24, Subpart F as follows:
1. Publishing a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the grantee’s workplace and specifying the actions that will be taken against employees for violation of such prohibition;
2. Establishing an ongoing drug-free awareness program to inform employees about;
(a)The dangers of drug abuse in the workplace;
(b)The grantee’s policy of maintaining a drug-free workplace; (c)Any available drug counseling, rehabilitation, and employee assistance programs; and,
(d)The penalties that may be imposed upon employees for drug abuse violations occurring in the workplace;
3. Making it a requirement that each employee to be engaged in the performance of the grant be given a copy of the statement required by paragraph 1;
4. Notifying the employee in the statement required by paragraph 1 that, as a condition of employment under the grant, the employee will – (a) Abide by the terms of the statement; and
(b) Notify the employer in writing of his or her conviction for a violation of a criminal drug statute occurring in the workplace no later than five calendar days after such conviction;
5. Notifying the agency in writing, within ten calendar days after receiving notice under subparagraph 4 (b) from an employee or otherwise receiving actual notice of such conviction. Employers of convicted employees must provide notice, including position title, to every grant officer or other designee on whose grant activity the convicted employee was working, unless the Federal agency has designated a central point for the receipt of such notices. Notice shall include the identification number(s) of each affected grant;
6. Taking one of the following actions, within 30 calendar days of receiving notice under subparagraph 4(b), with respect to any employee who is so convicted:
(a)Taking appropriate personnel action against such an employee, up to and including termination, consistent with the requirements of the Rehabilitation Act of 1973, as amended; or
(b)Requiring such employee to participate satisfactorily in a drug abuse assistance or rehabilitation program approved for such purposes by a Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House D - 2
Federal, State, or local health, law enforcement, or other appropriate agency;
7. Making a good faith effort to continue to maintain a drug-free workplace through implementation of paragraphs 1, 2, 3, 4, 5, and 6.
8. This certification meets the objectives and requirements of the United States Department of Housing and Urban Development (HUD).
Mercy House
Executive Director
Dated:
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 26-27 HOME – TBRA | CDBG – Admin : Mercy House E - 1
EXHIBIT “E”
ACTIVITY BENEFICIARY REPORT
Facility Name: ____________________________________________ Service Provider Agency: ____________________________________________ Reporting Period: __________________________________________________ Number of Persons Assisted Who Are:
Total
Number
Assisted
1 Extremely
Low
Income
(30% of
Median)
2 Very Low
Income
(50% of
Median)
3 Low
Income
(80% of
Median)
Persons
with
Disability
Female
Head-of-Household
Limited
English
Proficiency
Total
Number of
Individuals
RACE/ETHNICITY
Total Number
Assisted
(unduplicated)
Hispanic or
Latino
(duplicated)
Total Number
Assisted
(unduplicated)
Hispanic or
Latino
(duplicated)
White
American
Indian or
Alaskan Native
AND White
Black or African
American
Asian AND
White
Asian
Black or African
American AND
White
American
Indian or
Alaskan Native
American
Indian or
Alaskan Native
AND Black or
African
American
Native
Hawaiian or
Other Pacific
Islander
Balance of
individuals
reporting more
than one race
Comments:
________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ ________________________________________________________________________________________________________ _______________________________________________________________________________________________________.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A : NAIC #
NAME: CONTACT
(A/C, No): FAX
E-MAIL ADDRESS:
PRODUCER
(A/C, No, Ext): PHONE
INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR WVDADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$ PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person) COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS NON-OWNED OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?
(Mandatory in NH) DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEEE.L. EACH ACCIDENT EROTH- STATUTE PER
(MM/DD/YYYY) LIMITS POLICY EXP(MM/DD/YYYY) POLICY EFFLTR TYPE OF INSURANCE POLICY NUMBER INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $ AGGREGATE $
$
OCCUR
CLAIMS-MADE DED RETENTION $
PRODUCTS - COMP/OP AGG $ GENERAL AGGREGATE $ PERSONAL & ADV INJURY $ MED EXP (Any one person) $
EACH OCCURRENCE $ DAMAGE TO RENTED
PREMISES (Ea occurrence) $ COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO- JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
10/13/2026
IAG Insurance Services
111 Corporate Drive
Suite 100
Ladera Ranch CA 92694
JB Torsy 949-398-2155 949-387-2324 [email protected] License#: 0D78344 Berkshire Hathaway Homestate 20044 MERCHOU-01 James River Insurance Company 12203 Mercy House Living Centers, Inc
PO Box 1905
Santa Ana CA 92702-1905
Certain Underwriter's At Lloyds Of London 15792 2147333188 B X 1,000,000 X 50,000 1,000,000 3,000,000 X
Y Y 00163845-1 5/2/2026 2/8/2027
BI/PD Ded Per Claim 10,000
A
B
1,000,000 X
X X
Y Y 01APM058689-01
00169025-0
5/17/2026
5/2/2026
5/17/2027
2/8/2027
B 3,000,000 X X
00163873-1 5/2/2026 2/8/2027
3,000,000
A X
Y
Y MEWC751716 2/8/2026 2/8/2027
1,000,000 1,000,000 1,000,000
B
C
Professional Liability
Cyber Liability
00163845-1
BXU-CYC00000015-03
5/2/2026
5/2/2026
2/8/2027
2/8/2027
Each Claim/Aggregate
Each Claim/Aggregate
$1M/$3M
$2M/$2M
Excess Liability - 2nd Layer - Policy Number: UX000001048-03; Effective 5/17/2026 - 2/8/2027; Carrier: Admiral Insurance Company; NAIC #24856; Limits:
$4,000,000 per Occurrence/$4,000,000 Aggregate
Abuse/Molestation - Policy Number: 001638450-1; Effective 5/17/2026 - 2/8/2027; Carrier: James River Insurance Company; Limits: Each Claim $1,000,000 Each Claim/$1,000,000 Aggregate
Primary Excess Liability (James River) Schedule of Underlying: General Liability Policy and Professional Liability Re: Agreement #2024-196
See Attached...
City of Bakersfield
Office Of Risk Management
1600 Truxtun Ave
Bakersfield CA 93301
THIS CERTIFICATE SUPERSEDES PREVIOUSLY ISSUED CERTIFICATE Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 ACORD 101 (2008/01)
The ACORD name and logo are registered marks of ACORD
© 2008 ACORD CORPORATION. All rights reserved.
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: FORM TITLE:
ADDITIONAL REMARKS
ADDITIONAL REMARKS SCHEDULE Page of
AGENCY CUSTOMER ID:
LOC #:
AGENCY
CARRIER NAIC CODE
POLICY NUMBER
NAMED INSURED
EFFECTIVE DATE:
MERCHOU-01 1 1
IAG Insurance Services
Mercy House Living Centers, Inc
PO Box 1905
Santa Ana CA 92702-1905
25 CERTIFICATE OF LIABILITY INSURANCE
City of Bakersfield, its mayor, council, officers, agents, employees, and designated volunteers are included as Additional Insureds with respect to the General Liability coverage as per written contract. Coverage is Primary & Non-Contributory and a Waiver of Subrogation applies. Blanket Auto Liability Additional Insured is included. Coverage is a Waiver of Subrogation applies. Blanket Waiver of Subrogation for Workers' Compensation shall apply as required by written contract.
Subject to policy terms, conditions, and exclusions.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 M-5876 (05/2016)
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
BLANKET ADDITIONAL INSURED ENDORSEMENT
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
GARAGE COVERAGE FORM
TRUCKERS COVERAGE FORM
In consideration of payment of the additional premium listed below, LIABILITY COVERAGE is extended to any person or organization you are required to add to this policy as an additional insured in a written agreement between you and the additional insured that is executed prior to the "accident" provided that:
1) such insurance applies only to the ownership, maintenance or use of a covered auto; and 2) such insurance applies only to acts or omissions by you, your agents or your “employees” while such covered auto is being used in your business; and
3) such insurance does not apply to the acts or omissions of the additional insured or any of the additional insured’s agents or "employees" other than you; and
4) such insurance does not apply if the additional insured is subject to motor carrier insurance requirements and is not insured for hired "autos" under an "auto" liability insurance form that insures on a primary basis the owners of the "autos" and their agents and "employees" while the "autos" are being used exclusively in the additional insured’s business and pursuant to operating rights granted to the additional insured by a public authority; and
5) such inclusion of additional insured shall not increase our limit of liability under this policy.
All other terms, conditions and agreements remain unchanged.
M-5876 (05/2016)
Company Name Policy Number
Endorsement Effective
Named Insured Countersigned by
(Authorized Representative)
(The Attaching Clause need be completed only when this endorsement is issued subsequent to preparation of the policy .) Additional Premium: $
01 APM 058689 - 01
Redwood Fire and Casualty Insurance Company
MERCY HOUSE LIVING CENTERS INC
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
AH2312US 07-12 Page 1 of 1
ADDITIONAL INSURED AS REQUIRED BY
WRITTEN CONTRACT
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE
SECTION II – Who Is An Insured is amended to include any person or organization you are required to include as an additional insured on this policy by written contract or written agreement in effect during this policy period and executed prior to the “occurrence” of the “bodily injury” or “property damage.”
The insurance provided to the Additional Insured under this endorsement is limited as follows:
1. The person or organization is only an additional insured with respect to liability arising solely out of “your work” or “your product” which is imputed to the Additional Insured.
2. In the event that the Limits of Insurance provided by this policy exceed the Limits of Insurance required by the written contract or written agreement, the insurance provided by this endorsement shall be limited to the Limits of Insurance required by the written contract or written agreement. This endorsement shall not increase the Limits of Insurance stated in the Declarations.
3. The insurance provided to the Additional Insured does not apply to “bodily injury” or “property damage” arising out of the rendering or failure to render professional services.
4. This insurance does not apply to “bodily injury” or “property damage” arising out of “your work” or “your product” included in the “products – completed operations hazard” unless you are required to provide such coverage by written contract or written agreement but only for the period of time required by the written contract or written agreement. However, in no event, shall coverage extend beyond the expiration date of this policy.
5. Any coverage provided by this endorsement to an Additional Insured shall be excess over any other valid and collectible insurance available to the Additional Insured whether primary, excess, contingent or on any other basis unless a written contract or written agreement specifically requires that this insurance apply on a primary or contributory basis.
6. Where no coverage shall apply herein for the Named Insured, no coverage or defense shall be afforded to the Additional Insured.
7. This insurance does not apply to “bodily injury” or “property damage” arising out of the sole negligence of the Additional Insured.
ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CARFEULLY.
AP5004US 11-06 Page 1 of 1
WAIVER OF SUBROGATION AS REQUIRED BY
CONTRACT
This endorsement modifies insurance provided under the following:
ALL COVERAGE PARTS
The Company agrees to waive any right of recovery against any person or organization, as required by written contract, because of payments we make for injury or damage which is limited to liability directly caused by “your work” which is imputed to such person or organization.
ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702 Endorsement Effective: Policy No.:
Insured:
WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY
WC 99 04 10 C
(Ed. 01-19)
WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT-CALIFORNIA
BLANKET BASIS
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) The additional premium for this endorsement shall be calculated by applying a factor of 2% to the total manual premium, with a minimum initial charge of $350, then applying all other pricing factors for the policy to this calculated charge to derive the final cost of this endorsement.
This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule.
Schedule
Blanket Waiver
Person/Organization Blanket Waiver – Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver.
This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement No.:
Premium $
Insurance Company:
WC 99 04 10 C
Countersigned by ______________________________________ (Ed. 01-19)
Job Description
All CA OperationsRedwood Fire and Casualty Ins Co 02/08/2026 MEWC751716 Mercy House Living Centers, Inc.
Docusign Envelope ID: 05A37B76-EB69-83E9-81CC-6C0F60A4F702
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Zachary Meyer, Public Works Director
DATE: November 3, 2026
SUBJECT: Right of Way Agreement with Jaime G. Leal,
an individual, to acquire property interests located at 31-33 South Real Road for $400,000 for the Centennial Corridor Southbound SR99 to Westbound SR58 Connector Project (8th Movement) (Ward 2).
RECOMMENDATION:
Staff recommend approval of Agreement
BACKGROUND:
As part of the Thomas Road Improvement Program (TRIP), the City of Bakersfield is acquiring property interests to construct the Centennial Corridor Southbound SR99 to Westbound SR58 Connector Project (“Project”). The Project is also generally known as the 8th Movement of the Centennial Corridor. The connector will enable traffic to go from the southbound State Route 99 freeway off-ramp just north of Stockdale Highway, travel along a direct connector on a curved alignment in the northwest quadrant of the interchange and move onto westbound State Route 58 on the new freeway alignment.
The property interests being acquired include a partial fee acquisition, a sewer easement, a permanent easement for construction and maintenance of a retaining wall, and a temporary construction easement for a term of fifty-four (54) months. The acquisition price of $400,000 represents a negotiated settlement agreed upon by the City and Jaime G. Leal and avoids the need to acquire the property interests via eminent domain proceedings. The Right of Way agreement will allow the project to proceed with right of way certification by Caltrans and construction.
FISCAL IMPACT:
Adequate funds have been previously budgeted for this work. State and Federal (TCEP and STIP) funds provide the funding source for the agreements. Therefore, there is no impact to the City General Fund associated with this project.
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
Agreement
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Zachary Meyer, Public Works Director
DATE: November 3, 2026
SUBJECT: Possession and Use Agreement with Kaiser Foundation Health Plan, Inc. for property interests located at 3501 Stockdale Highway for $589,000 and additional compensation for construction-impact measures for $1,740,566 for the Centennial Corridor Southbound SR99 to Westbound SR58 Connector Project (8th Movement) (Ward 2).
RECOMMENDATION:
Staff recommend approval of Agreement
BACKGROUND:
As part of the Thomas Roads Improvement Program (TRIP), the City of Bakersfield is acquiring property interests to construct the Centennial Corridor Southbound SR99 to Westbound SR58 Connector Project (“Project”). The Project is also generally known as the 8th Movement of Centennial Corridor. The connector will enable traffic to go from the southbound State Route 99 freeway off-ramp just north of Stockdale Highway, travel along a direct connector on a curved alignment in the northwest quadrant of the interchange and move onto westbound State Route 58 on the new freeway alignment.
The possession and use agreement will allow the City to acquire the necessary possession rights of the following property interests: a fee acquisition, a permanent aerial easement, a permanent access easement and a temporary construction easement. The acquisition amount of $589,000 is the property interests’ fair market value as established by an appraisal prepared by a third-party consultant. While Kaiser is not in agreement with the acquisition amount, they are in favor of the project and are willing to enter into an irrevocable possession and use agreement, for the project to continue moving forward. The possession and use agreement also allocated additional compensation for temporary-impact measures which will affect the operations of Kaiser Foundation Health during the construction of the project. The additional compensation of $1,740,566 represents the cost of additional services, staffing, equipment and wayfinding signage related to the off-site parking which Kaiser will need to provide to its clients due to the project construction impacts. The possession and use agreement will allow the project to proceed with right of way certification and construction while negotiations regarding just compensation remain ongoing.
This agreement is still being finalized. A blue memo for the finalized agreement will be issued and included the week of November 16th.
FISCAL IMPACT:
Adequate funds have been previously budgeted for this work. State and Federal (TCEP and STIP) funds provide the funding source for the agreements. Therefore, there is no impact to the City General Fund associated with this project.
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
Agreement
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Zachary Meyer, Public Works Director
DATE: November 3, 2026
SUBJECT: Possession and Use Agreement with California Water Service Company . for property interests located at 3403 Stockdale Highway for $103,000 for the Centennial Corridor Southbound SR99 to Westbound SR58 Connector Project (8th Movement) (Ward 2)
RECOMMENDATION:
Staff recommend approval of Agreement
BACKGROUND:
As part of the Thomas Road Improvement Program (TRIP), the City of Bakersfield is acquiring property interests to construct the Centennial Corridor Southbound SR99 to Westbound SR58 Connector Project (“Project”). The Project is also generally known as the 8th Movement of Centennial Corridor. The connector will enable traffic to go from the southbound State Route 99 freeway off-ramp just north of Stockdale Highway, travel along a direct connector on a curved alignment in the northwest quadrant of the interchange and move onto westbound State Route 58 on the new freeway alignment.
The possession and use agreement will allow the City to acquire the necessary possession rights of the following property interests: a permanent aerial easement and a permanent access easement. The acquisition amount of $103,000 is the property interest’s fair market value as established by an appraisal prepared by a third-party consultant. While Calwater is not in agreement with the acquisition amount, they are in favor of the project and are willing to enter into the possession and use agreement, for the project to continue moving forward. The possession and use agreement will allow the project to proceed with right of way certification and construction while negotiations regarding just compensation remain ongoing.
This agreement is still being finalized. A blue memo for the finalized agreement will be issued and included the week of November 16th.
FISCAL IMPACT:
Adequate funds have been previously budgeted for this work. State and Federal (TCEP and STIP) funds provide the funding source for the agreement. Therefore, there is no impact to the City General Fund associated with this project.
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
Agreement
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Daniel Maldonado, Water Director
DATE: October 27, 2026
SUBJECT: Design Consultant Agreement with Diversified Project Services International, Inc. (not to exceed $200,334) to provide design and engineering services for the Carrier Spreading Facility Pipeline Rehabilitation Project (Ward 3, 6) RECOMMENDATION:
Staff recommends approval of the agreement.
BACKGROUND:
The Water Department is responsible for the City’s Domestic Water System and the Kern River System, including several canals and recharge facilities. The Truxtun Lakes Carrier Spreading Facility is a groundwater recharge site located on Truxtun Avenue, between Coffee Road and Mohawk Street.
Pipelines connecting the Truxtun Lakes to the Carrier Canal run beneath Truxtun Avenue and the parking lot of the medical offices on the south side of the street and serve as the primary intake for water to the Truxtun Lakes. The pipeline facilities and inlet and outlet structures are at the end of their useful life and are in need of rehabilitation.
Staff referenced the list of qualified firms that are a part of the City’s Library of Consultants (Resolution 009-2026) and sent a Request for Fee Proposal for design services to Diversified Project Services International, Inc. (DPSI) due to their qualifications and experience in surface water and pipeline infrastructure. DPSI provided a proposal to assess the structural integrity of the pipelines, develop a rehabilitation strategy, and provide design and engineering services. City staff recommend approval of the agreement with DPSI based upon their qualifications and fee proposal being favorable to the City.
FISCAL IMPACT:
Sufficient funds are budgeted in the Water Department’s Capital Improvement Budget within the River and Agriculture Water Fund for FY 2026-2027; therefore, no General Fund dollars will be expended for this project.
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
1. Agreement
2. Exhibit A
3. Exhibit B
Bakersfield San Luis Obispo Long Beach | www.dpsiinc.com October 2, 2026
Silvia Arizaga
City of Bakersfield’s Water Department
1501 Truxtun Avenue
Bakersfield, CA 93301
Subject: Project No. 27WDWR06 Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation Dear Ms. Arizaga:
Thank you for the opportunity to submit our proposal for the Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation project. Our services include CCTV inspection and condition assessment of the intake and return pipelines, diversion planning, rehabilitation recommendations, and preparation of design plans, specifications, and an engineer’s estimate.
Established in 2007, DPSI brings together licensed civil and mechanical engineers, land surveyors, certified inspectors, and construction managers to support public works and infrastructure projects. Our mechanical integrity and engineering teams combine experience in embedded piping assessments and rehabilitation design, providing continuity from field inspection through the completed design package.
For Truxtun Lakes, our approach connects documented pipeline conditions with practical rehabilitation recommendations and coordinated design. Close communication with City staff throughout inspection, engineering, and review will support completion of the final plans, specifications, and engineer’s estimate by May 31, 2027.
We appreciate your consideration and look forward to supporting the City of Bakersfield on this project.
Sincerely,
Espiri Ferreira, PE
Director of Mechanical Engineering
Diversified Project Services International, Inc.
CSLB 973308 | DIR #1000005579 | UEI GNKAG9NG9X76
5351 Olive Drive, Suite 100
Bakersfield, CA 93308
[email protected]
(661) 371-2800
Bakersfield San Luis Obispo Long Beach | www.dpsiinc.com October 2, 2026
Silvia Arizaga
City of Bakersfield
1000 Buena Vista Road
Bakersfield, CA 93311
via email: [email protected]
SUBJECT: PROPOSAL FOR SERVICES | TRUXTUN LAKES CARRIER SPREADING FACILITY PIPELINE REHABILITATION – BAKERSFILED, CALIFORNIA
Dear Ms. Arizaga:
We are pleased to provide you with this proposal for CCTV inspection, pipeline condition assessment, diversion planning, and rehabilitation design for the Truxtun Lakes Carrier Spreading Facility in Bakersfield, California. We understand the City seeks to assess the structural integrity of the existing intake and return pipelines, develop rehabilitation plans and specifications, and obtain an engineer’s estimate by May 31, 2027. DPSI’s experience assessing embedded reinforced concrete piping, supported by our in-house engineering team, will provide continuity from field inspection through rehabilitation design, bidding and construction.
Diversified Project Services International, Inc. (DPSI) will provide the following services as described below.
SCOPE OF SERVICES
DPSI will assess the existing intake and return pipelines at the Truxtun Lakes Carrier Spreading Facility and use the findings to support rehabilitation recommendations and design. Based on the City’s available records, the return pipe is a 30-inch reinforced concrete pipe (RCP), and the intake pipe is believed to be a 36-inch RCP, its size and configuration will be verified to the extent accessible during the assessment.
CCTV INSPECTION AND CONDITION ASSESSMENT
DPSI will perform closed-circuit television (CCTV) inspections using a remotely operated camera crawler with pan, tilt, and zoom capabilities. PACP-trained personnel will document observed conditions using NASSCO PACP coding, where applicable.
The inspection will identify and record visible defects, obstructions, connections, infiltration, and other conditions relevant to the pipelines’ structural condition and rehabilitation design. DPSI will review the video and inspection records and summarize the findings for each pipeline.
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 2 DPSI will coordinate access and inspection activities with the City and provide a qualified standby rescue team for confined-space entry associated with the CCTV inspection. The camera crawler will inspect the pipelines remotely, with personnel entering access structures as needed to deploy and retrieve the equipment.
SURVEY
A topographic survey is needed to provide the existing condition of a site for design purposes. We will prepare a topographic survey of the site showing the following information:
Elevations based North American Vertical Datum of 1988 (NAVD 88) Horizontal control based on North American Datum of 1983 (NAD 83) Obtain design level topographic sections on 50-foot stations, including all visible features within the 25-foot corridor of the existing pipeline.
Locate and collect all curbs, flowlines, lip of gutters, back of sidewalk, driveways, curb ramps, median curbs, street crown, fences, retaining walls, trees, signs, striping, railroad tracks, monuments, trench scars, and buildings
Locate and collect visible utility features (valves, meters, cleanouts, manholes, inlets, fire hydrants, vaults, poles, streetlights, traffic signals, USA markings, etc.) Obtain rim and invert elevations for all manholes and inlets. Provide pipe sizes, directions and include photos of inside structures with indication of north arrow direction on photo
DIVERSION PLAN
DPSI will create a detailed specification for temporarily diverting flow from the Carrier Canal. DPSI will gather and clearly delineate the information required for bidding and designing a temporary hydraulic system that will accommodate a safe dry-work area for access to the project site while minimizing interruption to canal operations.
The specification will outline additional requirements, including but not limited to noise mitigation, on-site system monitoring/operation, automation of the hydraulic system, local and remote alarms for site conditions, etc.
DPSI will provide engineering support for the temporary diversion system during the contractor bidding, design, installation and operation phases.
AS-BUILT/REHABILITATION RECOMMENDATIONS DESIGN
DPSI will create an as-built of the existing Intake line which routes water from the southern canal to Lake #1 in the south east corner of the lake from the MI and Survey data. As-built plans will consist of a Plan/Elevation View, along with details of both ends of the line. DPSI will review MI Inspection report to determine where failed piping location occurred. Two to three repair options will be investigated and summarized in a report. Detail rehabilitation plans will be developed and will include a Plan/Elevation View, along with details of the repair option. The 100% IFC plans will be stamped and signed and sealed by a California Registered Engineer.
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 3 DPSI will prepare and provide technical specifications for the project work to be incorporated into the construction bid package. Owner will provide their standard contract documentation intended for this project at the 60 percent review phase. The technical specifications will be prepared and provided for Owner’s review at the 90% review phase.
The Engineer’s Estimate will be the engineer’s opinion of the probable cost to construct the project. It will be prepared and based upon available data and the estimated quantities of work to be completed.
Every effort to account for the effect of inflation and oscillating construction costs will be made but the engineer will make no guarantee as to actual costs received at bid opening.
BIDDING AND CONSTRUCTION SUPPORT
DPSI will assist the City of Bakersfield in the bidding process in order to subcontract grading/earthwork and pipeline repairs for the project. Bidding and construction support services will consist of answering RFI’s during the bidding and construction process, along with preparing any necessary plan revisions or addenda, providing submittal reviews, and attending construction site meetings as necessary.
DELIVERABLES
CCTV Assessment
CCTV inspection video of the accessible portions of the intake and return pipelines in .mp4 format.
Inspection records documenting the location and condition of observed defects, obstructions, connections, infiltration, and other relevant findings, with NASSCO PACP coding where applicable.
A condition assessment report for both pipelines, including an executive summary, representative photographs, inspection limitations, and findings relevant to rehabilitation design.
Survey
CAD drawing of as-built of intake pipeline
Diversion Plan
Diversion Plan Specification
As-built/Rehabilitation Recommendations Design
As-built consisting of one Plan/Elevation View, and one detail sheet of both ends of the line Repair options summary report
Detail Rehabilitation consisting of one Plan/Elevation View, and one detail sheet of proposed repair
Technical Specifications document
Engineer’s Estimate of Construction Cost
Bidding and Construction Support
Bid packages for earthwork and pipeline repairs
Plan revisions or addenda (if necessary)
RFI responses (as needed)
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 4
SCHEDULE
Work will begin upon receiving authorization to proceed. The proposed sequence below allows the CCTV findings to inform the rehabilitation design. Final plans, specifications, and the engineer’s estimate will be submitted by May 31, 2027. While every effort will be made to adhere to the schedule provided, unexpected field conditions, design constraints, or other conditions may arise that extend out the estimated schedule. DPSI will keep the client informed on any substantial changes to the scheduling for deliverables.
MILESTONE SCHEDULE
Kickoff, site coordination, and diversion planning Upon Authorization to Proceed CCTV inspection of Lake 1 4 field days, 1 week reporting CCTV inspection of Lake 2 5 field days, 1 week reporting Survey 1 field day, 1 day office
Diversion Plan 1 field day, 2 weeks reporting
As-built Plans of Intake line 2 weeks
Condition assessment & rehabilitation recommendations 2 weeks Submit plans, specifications, and engineer’s estimate 4 months City approval of plans, specs, and estimate 4 weeks
Address City comments and submit final design package Before May 31, 2027
CLARIFICATIONS AND ASSUMPTIONS
The following clarifications and assumptions apply to this proposal and are in addition to those stated in the above scope descriptions:
The City will provide available drawings, site aerials(*.TIFF), operating information, and any required site-specific safety and environmental orientation for DPSI and the rescue team. The City will coordinate the necessary flow restrictions and provide the pipelines isolated, accessible, and sufficiently cleaned for CCTV inspection. The CCTV crawler is submersible but is not intrinsically safe. DPSI and the City will review atmospheric conditions and applicable equipment and permit requirements before inspection. A qualified standby rescue team is included for confined-space entry associated with CCTV equipment deployment and retrieval. Access points must be available and suitable for the planned entry and rescue procedures.
In the event that structural voids, gaps, or discontinuities are encountered that exceed the crawler's safe traversal capability, the inspection will be suspended at that location. This precautionary protocol is strictly observed to mitigate the risk of equipment entrapment and to ensure the crawler can be safely retrieved without damage or loss. Cleaning, debris removal, construction of new access points, and crawler recovery requiring excavation or other construction work are excluded unless expressly included elsewhere in the proposal.
Any site-specific Safety and Environmental training required for DPSI personnel is to be provided by the City’s EH&S department.
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 5 Additional work or delays caused by circumstances beyond DPSI’s reasonable control will be billed on a Time and Material basis.
Invert location at both end of the pipes will be accessible. Require accessibility to the south side of the carrier canal for survey. The diversion plan is included in the proposed engineering scope. Responsibility for installing and operating a temporary diversion must be defined separately. The city will provide information required to formulate the diversion plan specification. Such information includes but is not limited to the following:
o Minimum, maximum, and average flowrates.
o Maximum canal water solids size.
o Allowable suction and discharge locations.
o Site elevation (in ft above sea level) where pumps will be located. o Site elevation (in ft above sea level) where the diversion will discharge. o Any pertinent elevations between the suction and discharge location. o Minimum, maximum suction and discharge site water depths (in ft above sea level) in canal.
o Upstream and downstream retention volumes (allows for a calculation of reaction time available for a backup pump to turn on or a crew to react in the case of a failure) o Invert elevation (in ft above sea level) of canal.
o Allowable water fluctuation depth and fluctuation frequency in canal. o Pressures required at tie-point locations (if applicable) o Sound constraints
o Required local and remote alarms: LAH, LAHH, LAL, LALL, Backup Pump On, Primary Pump Off, low battery, other diagnostic alarms, etc.
o Pump automation vs manual operation preferences.
o Preferred automated pump operation, if applicable: single-speed float on/off, transducer linear throttle control, transducer target level control. Specification of suction-side or discharge-side driven controls. Local and remote-control preferences. o Reverse-flow requirements.
o Hours of operation for temporary system.
o Preferred pipe materials: HDPE, Aluminum IG, HD Tank hose, etc. Costs assume that there will be one round of review and comments per 30%, 60%, 90% submittal by City to capture redlines.
Drawings not clearly specified in this proposal are not included in scope. Drawings will utilize the DPSI standard title block template unless one is provided by the City. Proposal assumes construction permit is not required for this project.
ADDITIONAL SERVICES
The following services can be provided under an Additional Services Agreement:
Permitting services if required
Grading and erosion plans if required
Traffic Control Plan if needed
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 6
FEE SUMMARY
DESCRIPTION ESTIMATED T&M FEE FIXED FEE
Phase 1: Project coordination and mobilization $4,750
Phase 2: CCTV inspection, including standby rescue team $48,264 Phase 3: Condition assessment report and inspection videos $16,680 Phase 4: Survey $5,365
Phase 5: Diversion Plan $6,300
Phase 6: As-built/Rehab Plans, Specs, and Engineers Estimate $88,825 Phase 7: Bidding and Construction Support $30,150
TOTALS $99,844 $100,490
The fees stated above are based on prevailing wage rates. The rates are subject to change to reflect increases to the general prevailing wage determinations made by the Director of Industrial Relations. Reimbursable expenses, including but not limited to reproduction costs, are in addition to the fees quoted above.
SCHEDULE OF VALUES (FOR FIXED FEES)
PROJECT PHASE BILLING AMOUNT
Ph.4 – Costs due upon completion of field work $5,365
Ph.5 – Costs due upon submittal of Diversion plan $6,300 Ph.6 – Costs due upon submittal of as-built plan and Recommendation Report $28,765 Ph.6 – Costs due upon submittal of 30% Rehabilitation Plans $30,030 Ph.6 – Costs due upon submittal of 60% Rehabilitation Plans $15,015 Ph.6 – Costs due upon submittal of 90% Rehabilitation Plans $7,508 Ph.6 – Costs due upon submittal of 1000% Rehabilitation Plans $7,508 Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 7
TERMS AND CONDITIONS
This agreement consists of the scope of services, the following terms, and any exhibits or applicable documents attached. This agreement supersedes any and all prior negotiations, correspondence, or agreements either written or oral. Any changes to this agreement must be mutually agreed to in writing.
DPSI bills weekly for work in progress according to the Schedule of Values above and payment is due no later than 30 days of receipt of the bill. Overdue amounts will be surcharged at 18 percent per annum or
1.5 percent monthly.
If the terms of this proposal are acceptable, please sign the following acceptance and return a copy, which will serve as our notice to proceed. The fees quoted in this proposal are valid for 60 days from this date.
If you have any questions or would like clarification on the scope of services or fees outlined above, please do not hesitate to contact us. We thank you for this opportunity to offer our services.
Respectfully submitted,
DIVERSIFIED PROJECT SERVICES INTERNATIONAL, INC.
Espiri Ferreira, PE
Director of Mechanical Engineering
[email protected]
(661) 371-2800
Enclosures:
Attachment A | Terms for DPSI Services
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 8
ACCEPTANCE OF TERMS AND AUTHORIZATION TO PROCEED
Proposal Date: October 2, 2026
Project Name: Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation Client agrees to accept work described in this proposal letter, including all terms and conditions, to be executed as of the date noted below. Payment is NOT contingent on third-party funds. Each of the signatories below represents that he or she is authorized to enter into this agreement.
City of Bakersfield Diversified Project Services International, Inc.
Signature Date Signature Date
Print Name Print Name
Title Title
Billing Email:
(for electronic invoices)
Billing Address:
(if different than mailing address)
Billing Code:
(i.e. PO, AFE, NWA, etc.)
Tasks Authorized:
(All tasks authorized unless otherwise noted)
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 9 ATTACHMENT A: TERMS FOR DPSI SERVICES
These Standard Terms and Conditions, together with our proposal and any exhibits or attachments noted in the proposal, make up the agreement between Diversified Project Services International (DPSI) and Client. Together these elements will constitute the entire agreement superseding any and all prior negotiations, correspondence, or agreements either written or oral. Any changes to this agreement must be mutually agreed to in writing.
1.0 Standard of Care
1.1 Data, interpretations, and recommendations by DPSI will be based solely on information provided to DPSI. DPSI is responsible for those data, interpretations, and recommendations, but will not be responsible for other parties' interpretations or use of the information developed.
1.2 Services performed by DPSI under this agreement are expected by the Client to be conducted in a manner consistent with the level of care and skill ordinarily exercised by members of this profession practicing contemporaneously under similar conditions in the locality of the project. No other warranty, expressed or implied, is made.
1.3 The Client agrees that DPSI may use and publish the Client's name and a general description of DPSI services with respect to the project in describing DPSI experience and qualifications to other clients and prospective clients. The Client also agrees that any patentable or copyrightable concepts developed by DPSI as a consequence of service hereunder are the sole and exclusive property of DPSI.
1.4 The Client recognizes that it is neither practical nor customary for DPSI to include all construction details in plans and specifications, creating a need for interpretation by DPSI or an individual who is under DPSI supervision. The Client also recognizes that construction review permits require DPSI to identify and correct quickly and at comparatively low cost professional errors or omissions that are revealed through construction, or errors or omissions committed by others due to misinterpretation of design documents, or due to other causes. For the foregoing reasons construction review is generally considered an essential element of a complete design professional service. Accordingly, if the Client directs DPSI not to provide construction monitoring, DPSI shall not be responsible for the consequences of any of DPSI acts, errors or omissions, except for those consequences which it reasonably could be concluded that DPSI review services would not have prevented or mitigated.
1.5 Client acknowledges that DPSI is not responsible for the performance of work by third parties including, but not limited to, engineers, architects, contractors, subcontractors, or suppliers of Client.
2.0 Billing and Payment
2.1 Invoices will be submitted to Client on a weekly basis (no longer than monthly) by DPSI and will be due and payable within 30 days of receipt of invoice. If Client objects to all or any portion of any invoice, Client will so notify DPSI in writing within fourteen (14) of the invoice date, identify the cause of the disagreement, and pay when due that portion of the invoice not in dispute. The parties will immediately make every effort to settle the disputed portion of the invoice. In the absence of written notification described above, the balance as stated on the invoice will be paid.
2.2 Invoices are delinquent if payment has not been received within forty-five (45) days from receipt of invoice. Client will pay an additional charge of 1-1/2 (1.5) percent per month or 18% per year of any delinquent amount, excepting any portion of the invoiced amount in dispute and resolved in favor of Client. All time spent and expenses incurred (including any attorney's fees) in connection with collection of any delinquent amount will be paid by Client to DPSI per DPSI current fee schedule. In the event Client fails to pay DPSI within sixty (60) days after invoices are rendered, Client agrees that DPSI will have the right to consider the failure to pay DPSI invoice as a breach of this agreement.
2.3 Client agrees that if Client requests services not specified herein, Client agrees to timely pay for all such services as extra work. DPSI will notify the Client prior to performance of services which are not specified in this agreement.
2.4 Client agrees that payment to DPSI is in no way contingent on the results of work by DPSI or on the outcome of any litigation.
2.5 Preparation and/or travel time will be charged at the hourly rate.
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 10
3.0 Additional Services
3.1 Additional services include making revisions in drawings, specifications or other documents when such revisions are: Inconsistent with approvals or instructions previously given by the Client, including revisions made necessary by adjustments in the Client's program or project budget; Required by the enactment or revision or codes, laws or regulations subsequent to the preparation of such documents.
3.2 Additional services include providing services required because of significant changes in the project including, but not limited to, size, quality, complexity, the Client's schedule, or the method of bidding or negotiating and contracting for construction.
3.3 Where unexpected developments increase the scope of work as defined herein and/or prove the assumptions of this proposal invalid, we will make a reasonable effort to contact you to discuss the effects and adjustment of cost.
4.0 Site Access and Site Conditions
4.1 Client will grant or obtain free access to the site for all equipment and personnel necessary for DPSI to perform the work set forth in this agreement. Client will notify any and all possessors of the project site that Client has granted DPSI free access to the site. DPSI will take reasonable precautions to minimize damage to the site, but it is understood by Client that, in the normal course of work, some damage may occur and the correction of such damage is not part of this agreement unless so specified in the proposal.
5.0 Ownership of Documents
5.1 All reports, maps, plans, field data, field notes, estimates and other documents, whether in hard copy or machine readable form, which are prepared by DPSI as instruments of professional service, shall remain the property of DPSI. The Client may retain copies, including copies stored on magnetic tape or disk, for information and for reference in connection with the occupancy and use of the project.
5.2 Because of the possibility that information and data delivered in machine readable form may be altered, whether inadvertently or otherwise, DPSI reserves the right to retain the original tapes/disks and to remove from copies provided to the Client all identification reflecting the involvement of DPSI in their preparation. DPSI also reserves the right to retain hard copy originals of all project documentation delivered to the Client in machine readable form, which originals shall be referred to and shall govern in the event of any inconsistency between the two.
5.3 The Client recognizes that changes or modifications to DPSI instruments of professional service introduced by anyone other than DPSI may result in adverse consequences which DPSI can neither predict nor control. Therefore, and in consideration of DPSI ' agreement to deliver its instruments of professional service in machine readable form, the Client agrees, to the fullest extent permitted by law, to hold harmless and indemnify DPSI from and against all claims, liabilities, losses, damages, and costs, including but not limited to attorney's fees, arising out of or in any way connected with the modification, misinterpretation, misuse or reuse by others of the machine readable information and data provided by DPSI under this Agreement. The foregoing indemnification applies, without limitation, to any use of the project documents on other projects, for additions to this project, or for completion of this project by others, excepting only such use as may be authorized, in writing, by DPSI.
5.4 Client agrees that all reports and other work furnished to Client or his agents, which are not paid for, will be returned upon demand and will not be used by Client or others for any purpose whatsoever.
6.0 Client Responsibilities
6.1 The Client shall provide full information including a program setting forth the Client's design objectives, constraints, and construction budget criteria.
6.2 The Client shall furnish a legal description, a certified land survey, and the services of a soil, structural, mechanical, electrical or other engineer or consultant services, and laboratory tests, inspections, or Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 11 reports as required by law or as requested by DPSI to perform the functions and services required of this agreement. The information shall be furnished at the Client's expense and DPSI shall be entitled to rely upon the accuracy and completeness thereof.
6.3 The Client shall furnish all legal, accounting and insurance counseling services as may be necessary at any time for the project, including auditing services the Client may require to verify the Contractor's Applications for Payment or to ascertain how or for what purposes the Contractor uses the moneys paid by the Client. The information above shall be furnished at the Client's expense, and DPSI shall be entitled to rely upon the accuracy and completeness thereof.
6.4 If the Client observes or otherwise becomes aware of any fault or defect in the project or nonconformance with the Contract Documents, prompt written notice shall be given by the Client to DPSI.
6.5 The Client shall furnish information and shall review DPSI work and provide decisions as expeditiously as necessary for the orderly progress of the project and of DPSI services.
7.0 Insurance
7.1 DPSI represents and warrants that it and its agents, staff and consultants employed by it, is and are protected by workman's compensation insurance and that DPSI has such coverage under public liability and property damage insurance policies which DPSI deems to be adequate. Certificates for all such policies of insurance shall be provided to Client upon request in writing. Within the limits and conditions of such insurance, DPSI agrees to indemnify and save Client harmless from and against any loss, damage or liability arising from any negligent acts by DPSI, its agents, staff, and consultants employed by it. DPSI shall not be responsible for any loss, damage or liability beyond the amounts, limits, and conditions of such insurance. DPSI shall not be responsible for any loss, damage, or liability arising from any acts by client, its agents, staff, and other consultants employed by client.
8.0 Termination
8.1 This agreement may be terminated by either party seven (7) days after written notice in the event of any breach of any provision of this agreement or in the event of substantial failure of performance by the other party, or if Client suspends the work for more than three (3) months. In the event of termination, DPSI will be paid for services performed prior to the date of termination plus reasonable termination expenses including the cost of completing analyses, records and reports necessary to document job status at the time of termination.
8.2 Failure of the client to make payments to DPSI when due in accordance with this agreement shall be considered substantial nonperformance and cause for termination. If the Client fails to make payment when due to DPSI for services and expenses, DPSI may, upon seven (7) days written notice to the client, suspend performance of services under this agreement. Unless payment in full is received by DPSI within seven (7) days of the date of the notice, the suspension shall take effect without further notice. In the event of a suspension of services, DPSI shall have no liability to the client for delay, damage, loss of agency approvals, loss of financing, interest expenses, etc. caused the Client because of such suspension of service.
9.0 Disputes Resolution
9.1 All claims, disputes, and other matters in controversy between DPSI and Client arising out of or related to this agreement will be submitted to "alternative dispute resolution" (ADR) such as mediation and/or arbitration, before and as a condition precedent to other remedies provided by law. If and to the extent Client and DPSI have agreed on methods for resolving such disputes, then such methods will be set forth in the "alternative dispute resolution agreement" which, if attached, is incorporated and made a part of this agreement.
9.2 If a dispute at law related to the services provided under this agreement and that dispute requires litigation instead of ADR as provided upon, then:
Truxtun Lakes Carrier Spreading Facility Pipeline Rehabilitation| 260961 Page | 12
9.2.1 The claim will be brought and tried in judicial jurisdiction of the court of the county where DPSI principal place of business is located and client waives the right to remove the action to any other county or judicial jurisdiction, and;
9.2.2 The prevailing party will be entitled to recovery of all reasonable costs incurred, including staff time, court costs, attorney's fees, and other claim related expenses.
10.0 Assigns
10.1 DPSI shall not assign this agreement in whole or in part nor shall it subcontract any portion of the work to be performed hereunder; except that DPSI may use the services of persons of entities not in our employ when it is appropriate and customary to do so. Such persons and entities include, but are not necessarily limited to, specialized consultants and testing laboratories. DPSI use of others for additional services shall not be unreasonably restricted by the client provided DPSI notifies the client in advance.
11.0 Governing Law and Survival
11.1 The law of the State of California will govern the validity of these terms, their interpretation and performance.
11.2 If any of the provisions contained in this agreement are held illegal, invalid or unenforceable, the enforceability of the remaining provisions will not be impaired. Limitations of liability and indemnities will survive termination of this agreement for any cause.
12.0 Indemnification
12.1 To the fullest extent permitted by law, both Parties shall release, protect, indemnify, and hold free and harmless each other from any and all liabilities, judgments, demands, claims, bodily injuries, damages, losses and expenses, including but not limited to reasonable attorneys’ fees and costs arising out of or resulting from or attributable in any way to injury to or death of persons, and direct damages to or loss of real or personal property, to the extent caused directly and solely by their negligent acts or omissions or for any and all direct losses due to any infringement of any proprietary interest which in whole or in part, arise out of, relate to, result from, or are connected with any infringement or violation.
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Daniel R. Maldonado, Water Director
DATE: November 3, 2026
SUBJECT: Construction Management Agreement with NV5, Inc. (Not to Exceed $410,810.70) to provide construction management services for the Wastewater Treatment Plants No. 2 and 3 Septage Receiving Station Improvement Project.
RECOMMENDATION:
Staff recommend approval of the agreement.
BACKGROUND:
The Wastewater Division operates four septage receiving stations, with two septage receiving stations at Wastewater Treatment Plant No. 2 (WWTP2) and two septage receiving stations at Wastewater Treatment Plant No. 3 (WWTP3). These stations receive septage from permitted haulers and are equipped with processing units that remove rocks, gravel, rags, and coarse solids from the septage, which reduces the potential for damage to downstream equipment.
Currently, both septage receiving stations at WWTP2 and one of the septage receiving stations at WWTP3 are nonfunctional and damaged beyond repair. In order to address current conditions, the Wastewater Treatment Plants No. 2 and 3 Septage Receiving Station Improvement Project was included in the FY 2026- 27 capital improvement program. The project will replace the out-of-service septage receiving stations including necessary piping and valves.
On October 21, 2026, NV5, Inc. submitted a proposal to provide construction management and inspection services for the Wastewater Treatment Plants No. 2 and 3 Septage Receiving Station Improvement Project. City staff recommend approval of the agreement with NV5, based on their qualifications being aligned with the scope of work and their proposal being favorable for the City. The proposed agreement is for the full duration of the project construction phase with total compensation not to exceed $410,810.70.
FISCAL IMPACT:
Sufficient funds are budgeted in the Sewer Enterprise Fund capital improvement program for this agreement, therefore, there is no impact to the City General Fund for this consultant agreement.
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
1. Agreement
2. Exhibit A
3. Exhibit B
4. Exhibit C
WASTEWATER TREATMENT PLANT NO 2 & NO. 3 SEPTAGE RECEIVING STATION IMPROVEMENTS PROJECT CM – Scope of Consultant Services 1
SCOPE OF CONSULTANT SERVICES
WASTEWATER TREATMENT PLANT NO. 2 & NO. 3 SEPTAGE RECEIVING STATION
IMPROVEMENTS
PROJECT NO. 25WDWW03 and E3K304
City of Bakersfield – Wastewater Division
DESCRIPTION OF PROJECT
Provide construction management services including construction observation and contract administration for upgrading two septage receiving stations at Wastewater Treatment Plant (WWTP) No. 2 and one septage receiving station at WWTP No. 3 (Plans dated 9/25/26 and Specifications dated 09/24/2026).
NV5 shall furnish a licensed Civil Engineer as Resident Engineer during the contract period.
NV5 will also provide construction inspection services and support staff, as needed, during the construction.
Based on a review of the provided project documents, it appears the project control monuments are provided by The City of Bakersfield – Wastewater Division. The construction Contractor will be required to perform the construction staking for the project.
The NV5 Resident Engineer will oversee the construction observations and major contract items such as construction change orders and claims.
The Resident Engineer shall be responsible for coordination with The City of Bakersfield – Wastewater Division and shall act as the key point of contact with the City. The Resident Engineer shall also be responsible for coordination of the Construction Management staff and will oversee the daily interaction with the Contractor, City of Bakersfield – Wastewater Division staff, and other public agencies.
NV5 shall complete the following contract administrative services.
Task 1: Pre-Construction Services
Task 1.1: Kick-Off Meeting
The NV5 Team will attend a meeting with The City of Bakersfield – Wastewater Division, the Designer, and any other affected agencies or stakeholders to discuss the design and construction schedule, and to coordinate responsibilities of the project management team. Other topics of the meeting will include contract administration procedures, submittal management, review times, WASTEWATER TREATMENT PLANT NO 2 & NO. 3 SEPTAGE RECEIVING STATION IMPROVEMENTS PROJECT CM – Scope of Consultant Services 2
procedures for change order concurrence, and general lines of communication between the parties.
Task 1.2: Pre-Construction Meeting
The NV5 Team will hold a pre-construction conference with the construction contractor, The City of Bakersfield – Wastewater Division, the Designer, and other stakeholders after contract approval and before start of work to review the project and discuss coordination efforts. This meeting will be used to establish managerial and administrative procedures with the contractor to ensure efficient startup and execution of the project. We will prepare and distribute an agenda and will keep and circulate meeting minutes.
Task 1.3: Pre-Construction Photographs
Before construction begins, the existing site conditions will be photographed and recorded by the NV5 Team. This record of existing conditions is essential to enforce the contractor’s responsibility to protect private property, The City of Bakersfield – Wastewater Division facilities, and third-party property/utilities. This inspection is also a key to proactively identifying any discrepancies between the site conditions and the project plans. NV5 will organize these preconstruction photograph records and store them digitally in the project files.
Task 2: Construction Management Services During Construction Task 2.1: Project Coordination and Correspondence
Task 2.1.1: Interaction with The City of Bakersfield – Wastewater Division Staff The NV5 Team will assist as a liaison between stakeholders to provide effective and timely communications and resolutions. We will be the main point of contact to coordinate the work of the contractor with the responsibilities of the construction management team. To assist the project team in serving this role, our key personnel will utilize onsite personal computers networked via the internet to The City of Bakersfield – Wastewater Division project manager, the Designer, construction management field offices, and appropriate agencies via the internet.
Task 2.1.2: Progress Meetings
The NV5 Team will hold weekly progress meetings with the contractor, their appropriate subcontractors, and The City of Bakersfield – Wastewater Division to review construction progress. Monthly meetings, to specifically discuss scheduling, will also be held to identify work completed and activities for the coming month. We will keep and distribute minutes of the meetings that assign action items and responsibilities and document project trends.
Task 2.2: Project Administration and Documentation
Task 2.2.1: Document Control
When performing construction management activities, an area of importance that cannot be overemphasized is Document Control. Effective control of a construction project cannot be maintained without paperwork to inform, change, expedite, and provide a permanent record. The NV5 Team will oversee all document control and assist The City of Bakersfield – Wastewater Division in maintaining all project files. All contract files will be in accordance with Caltrans LAPM and Construction Manual requirements. Contract files will be kept current at all times.
WASTEWATER TREATMENT PLANT NO 2 & NO. 3 SEPTAGE RECEIVING STATION IMPROVEMENTS PROJECT CM – Scope of Consultant Services 3
Task 2.2.2: Schedule Review
The NV5 Team will assist The City of Bakersfield – Wastewater Division in reviewing the contractor schedule for accuracy.
Task 2.2.3: Statement of Working Days
The NV5 Team will prepare a record of weather conditions, controlling item(s), and the status of working days remaining on a weekly basis. A copy will be sent to the contractor to allow them an opportunity to dispute the statement.
Task 2.2.4: Submittal Management
The NV5 Team will help The City of Bakersfield – Wastewater Division manage the contractor’s submittals during construction. The status of submittals will be accounted for in the submittal log. We will review submittals as requested by The City of Bakersfield – Wastewater Division and/or forward them to the Designer. If necessary, the NV5 Team will conduct meetings with the contractor and reviewing parties to discuss and resolve issues. A list of previously authorized submittals was sent by the City of Bakersfield. The time of the already reviewed submittals was not included in the proposal as these items have already been authorized. A short list of expected submittals includes:
▪ Construction schedule
▪ Labor Compliance
▪ SWPPP
▪ Safety program
▪ Shop drawings
▪ Concrete mix designs
▪ Reinforcing Steel shop fabrication & placement drawings ▪ Trenching and Shoring plans
▪ Miscellaneous material submittals
▪ Stainless Steel Pipes and Fittings
▪ Welding WCI Submittal with Qualifications
▪ Shop Drawings and Installation Plan for Shade Structures ▪ Seismic Restraint Equipment
▪ Arc-Flash Study
▪ Miscellaneous Electrical Submittals
▪ Process Control and Instrumentation
▪ Commissioning and Startup
Task 2.2.5: Request for Information Management
The NV5 Team provide guidance on requested design clarifications during construction. The status of Requests for Information (RFIs) will be accounted for in the RFI log. All clarifications are to be presented in writing by the contractor. We will help The City of Bakersfield – Wastewater Division respond when appropriate. RFIs which might impact the design intent will be submitted to the Designer. If necessary, NV5 will attend meetings with the contractor and other parties to discuss and resolve requests for information.
WASTEWATER TREATMENT PLANT NO 2 & NO. 3 SEPTAGE RECEIVING STATION IMPROVEMENTS PROJECT CM – Scope of Consultant Services 4
Task 2.2.6: Change Order Management & Cost Control
Evaluation and negotiation of Contract Change Orders (CCOs) are among the most important functions of the construction management team. A quick and accurate evaluation can help keep the project on schedule and avoid contractor claims. Prior to requesting The City of Bakersfield – Wastewater Division approval, all CCOs will be evaluated by the NV5 Team. The review will include:
▪ Keeping The City of Bakersfield – Wastewater Division’s project manager informed on status of all CCOs.
▪ Maintaining a log of proposed CCOs, indicating action dates and status. ▪ Determining if the condition is a changed condition and documenting rationale. ▪ Coordinating with The City of Bakersfield – Wastewater Division and the Designer regarding impacts on the design.
▪ Evaluating contractor’s CCO cost estimates and schedule impacts, negotiating as required.
▪ Accurately documenting labor, equipment and materials used on force account work. ▪ Preparing CCO documentation for The City of Bakersfield – Wastewater Division and contractor signatures.
▪ Processing and incorporating the CCO into the progress payment breakdown.
Task 2.2.7: Monthly Payment Review
The NV5 Team will review applications for payment with The City of Bakersfield – Wastewater Division and the contractor and assist in negotiating any differences between the amount requested and the engineer’s estimate for work completed. The estimate will include a systematic determination of the quantities of work completed and their values. Information from the construction management team’s field data will include measurements of bid items on the project cost breakdowns. This data will be used to assist with determining the monthly progress payments. Payments will be processed through The City of Bakersfield – Wastewater Division’s project manager.
Task 2.2.8: Claims Management
The NV5 Team will take the lead in the resolution of any contract claims for the project during the construction contract period. We will keep current logs of Potential Claim Records and will prepare documents and supporting evidence regarding claims. Information on each individual Potential Claim Records will be kept separately in the project files. Documentation and recommendations will also be assembled into a report and submitted to The City of Bakersfield – Wastewater Division for review and use. The NV5 Team will be available to provide additional claims resolution support if further action is required and requested by the city. Claims resolution work, if any, is typically managed in the post construction services and will be performed as an extra work item because the amount of work cannot be determined ahead of time.
Task 2.2.9: Labor Compliance
The NV5 Team shall assist The City of Bakersfield – Wastewater Division with labor compliance by receiving and logging certified payrolls and any other labor documentation that is WASTEWATER TREATMENT PLANT NO 2 & NO. 3 SEPTAGE RECEIVING STATION IMPROVEMENTS PROJECT CM – Scope of Consultant Services 5
submitted by the contractor and subcontractors on a weekly basis. Copies of the contractor’s certified payrolls along with copies of our daily diaries showing names of contractor’s or subcontractor’s personnel on the site along with the number of hours worked each day will be provided to The City of Bakersfield – Wastewater Division. Additionally, periodic information provided by the contractor or subcontractors, such as a fringe benefits statement, will also be copied and provided. Weekly listings of companies and individuals furnishing job-site labor on the project will be completed by NV5 and transmitted to the contractor, notifying them of the certified payroll submittal requirements.
Task 2.3: Construction Observation and Inspection Services Several forms of documentation and correspondence will be used during this project. The NV5 Team will use records, such as videotaping and still photographs (in electronic format), to document existing conditions, major features, and construction progress. We will keep and submit daily diaries. The resident engineer will review these diaries and summarize the information in a monthly status report to the City of Bakersfield – Wastewater Division as needed.
Task 2.3.1: Field Inspection and Daily Reporting
The construction management team serves as the front line of quality assurance of the contractor’s work and as the eyes and ears to identify potential problems such as utility conflicts, schedule issues, and design ambiguities, before they occur. Primary inspection services will be provided by NV5 and will include the following:
▪ Provide day-to-day written inspection reports on all activities performed by the contractor.
▪ Determine if work complies with contract documents, The City of Bakersfield – Wastewater Division standards, and project permits and approve/reject work accordingly. ▪ Document work performed, manpower, and extra work through daily diaries. ▪ Verify contractor is implementing safety plan and safe practices in accordance with OSHA regulations.
▪ Coordinate Quality Assurance material testing with The City of Bakersfield – Wastewater Division’s laboratories and coordinate corrective measures as required for failing materials.
▪ Identify any potential flaws in the constructed product and provide feedback on proposed remedial action from the contractor.
▪ Perform quantity calculations based on completed work for Progress Payments. ▪ Take progress photos of the work and field conditions; and ▪ Prepare a punch list and update as-built records as the work progresses.
Task 2.3.2: Storm Water Pollution Prevention Plan (SWPPP) Monitoring While SWPPP compliance is the contractor’s responsibility, the NV5 Team will provide oversight SWPPP monitoring services. Oversight SWPPP monitoring services include:
▪ Reviewing contractor’s SWPPP.
▪ Verifying the contractor has taken responsibility for SWPPP in the SMARTS system.
WASTEWATER TREATMENT PLANT NO 2 & NO. 3 SEPTAGE RECEIVING STATION IMPROVEMENTS PROJECT CM – Scope of Consultant Services 6
▪ Verifying appropriate and effective BMPs are in place. ▪ Documenting ineffective BMPs and recommending changes. ▪ Verifying inspections, documentation and sampling is in accordance with the GCP. ▪ Verifying compliance with approved SWPPP, recommending changes and verifying that amendment is created and logged in the SMARTS system.
▪ Verifying illicit discharges, if any, are reported.
▪ Verifying annual report has been filed on the SMARTS system.
Task 2.4: Project Control and Monument Staking
NV5 may utilize the contractor’s stakes, or other City of Bakersfield – Wastewater Division control points for field verification of work.
Task 3: Post-Construction and Project Closeout Services Task 3.1: Final Inspection & Issue Notice of Completion Items to be corrected or furnished by the construction contractor before project acceptance will be put in the form of a punch list as the work nears completion. With input from The City of Bakersfield – Wastewater Division, the Designer, and other affected agencies, NV5 will prepare the punch list. Upon satisfactory completion of all elements of construction and deliverables, The City of Bakersfield – Wastewater Division will submit a Notice of Final Completion to the contractor, thus relieving them from further maintenance.
Task 3.2: Prepare and Recommend Final Payment Request
After acceptance, the NV5 Team will prepare a Proposed Final Estimate (PFE) to allow the contractor to make exceptions to the final amount of compensation. Prior to submitting the PFE, we will meet with the contractor to attempt to agree on final payment for all contract items and change orders. If the contractor still objects to the PFE, we will assist The City of Bakersfield – Wastewater Division in negotiating final settlement with the contractor and process the final estimate.
Task 3.3: Review and Submit As-Builts
At the Project’s completion, the NV5 Team will receive the contractors’ prepared as-built drawings and perform a final review for completion against our record drawings. Final as-built drawings will be submitted to The City of Bakersfield – Wastewater Division and the Designer for final processing.
Task 3.4: Deliver Project Files
Project files will be maintained in hard copy and electronic formats. The hard copy files will be packaged in accordance with the Caltrans Construction Manual procedures and delivered to The City of Bakersfield – Wastewater Division. A digital copy of the project files will also be provided on a CD or USB flash drive.
COMPLETION SCHEDULE
WASTEWATER TREATMENT PLANT NO 2 & NO. 3 SEPTAGE RECEIVING STATION IMPROVEMENTS PROJECT CM – Scope of Consultant Services 7
NV5 shall be bound by the requirements of the Agreement from the start of construction services commencing in January 2026 until the conclusion of post-construction services. It is understood that this agreement is based on the assumptions that the construction contract will have no more than 120 working days.
In the event that The City of Bakersfield – Wastewater Division’s Project Manager requires additional Construction Management services above the value established in the attached fee estimate; or the Construction Contract duration exceeds the working days listed above, NV5 will remain onsite and provide continuous Construction Management services. However, these services shall be considered as additional services, are above and beyond the scope and fee estimate of this contract and shall be paid on a cost-plus fixed fee basis as set forth by the appropriate hourly wages, mark-up, and profit shown in the attached fee estimate. In addition, should The City of Bakersfield – Wastewater Division request additional services not included in the contract, NV5 can provide those services. They shall also be considered as additional services, to be paid on a cost-plus fixed fee basis.
FEE SCHEDULE
Compensation to provide Construction Management services required for the construction observation and administration for the subject construction project as detailed in this Agreement, for the time periods discussed in the previous section throughout the duration of the contract, shall be on a time and materials basis for the necessary personnel and reimbursables at the rates included herein.
Name Kevin Reisz, PE Gabriel Macias, PE Landon Wright TOTAL COST Classification
Project Manager Resident Engineer Inspector* Office Engineer / Labor Complaince Officer
Hourly Billing Rate (1) $397.62 $279.27 $257.89 $152.25
1.1 Kick-off Meeting 1 2 1
1.2 Pre-Construction Meeting 2 1 1
1.3 Pre-construction Photos 1 4
Man Hour Total 1 5 6 1
Total Fees $397.62 $1,396.35 $1,547.34 $152.25 $3,493.56 Task 2.1 Project Coordination and Correspondence
2.1.1 Interaction with City Staff 4 12
2.1.2 Progress Meetings 4 12 12 12
Task 2.2 Project Administration and Documentation
2.2.1 Document Control 12 4
2.2.2 Schedule Update Review 12
2.2.3 Statement of Working Days 8
2.2.4 Submittal Management 100
2.2.5 Request for Information Management 12
2.2.6 Change Order Management & Cost Control 2 8
2.2.7 Monthly Payment Review & Cost Control 12
2.2.8 Claims Management 1 8
2.2.9 Labor Compliance 0 48
Task 2.3 Construction Observation Services / Inspection Services
2.3.1 Field Inspection and Daily Reporting 24 576
2.3.2 Storm Water Pollution Prevention Plan(SWPPP) Monitoring 8 12 Task 2.4 Project Control Monument Staking
2.4.1 Project Control Monument Staking (Not Included)
Man Hour Total 11 228 600 64
Total Fees $4,373.82 $63,673.56 $154,734.00 $9,744.00 $232,531.38
3.1 Final Inspection & Notice of Completion 4 8
3.2 Prepare & Recommend Final Payment Request 4 1
3.3 Review & Submit As-Builts 4 4
3.4 Deliver Project Files 1 1
Man Hour Total 0 13 12 2
Total Fees $0.00 $3,630.51 $3,094.68 $304.50 $7,029.69
Man Hour Total Tasks 1 - 3 12 246 618 67
Total Fees Tasks 1 - 3 $4,771.44 $68,700.42 $159,376.02 $10,200.75 $243,054.63 Notes and Assumptions: Other Direct Costs
1. NV5 employees hourly rates include project-related overhead, profit, safety equipment, vehicles, laptops, and cell phones.
2. Cost proposal is based on 8-hour shifts according to the Caltrans 5-Day Working Calendar. Overtime hours will be paid in accordance with applicable labor law and prevailing wage rates. Office Expenses $0.00
3. Adjustments to this estimate may be required if the actual schedule requires more or less construction management services than proposed.
5. Time extensions to the project may result in additional Construction Managemnent services & fees. Total Proposal Costs $243,054.63
6. This estimate is based on the specific scope of work described for the Septage Receiving Station Project 24WDWW03, E3K30400 (Plant No. 2)
7. * Classifications requiring prevailing wage are subject to the provisions set forth in the latest DIR determination.
8. This cost estimate includes services for dispute resolution through project acceptance. Services for claims after acceptance will be provided at additional costs.
4. This cost estimate is based on the project being completed within 120 working days with a part time Resident Engineer.
Fee Proposal for CM and Inspection Services - Wastewater Treatment Plant No. 2 Septage - PROJECT NO. 25WDWW03, E3K30400 Prepared for The City of Bakersfield
TASK I: PRECONSTRUCTION SERVICES
TASK 2: CONSTRUCTION MANAGEMENT SERVICES DURING CONSTRUCTION TASK 3: POST CONSTRUCTION & PROJECT CLOSEOUT SERVICES
Name Kevin Reisz, PE Gabriel Macias, PE Landon Wright TOTAL COST Classification
Project Manager Resident Engineer Inspector* Office Engineer / Labor Complaince Officer
Hourly Billing Rate (1) $397.62 $279.27 $257.89 $152.25
1.1 Kick-off Meeting 1 2 1
1.2 Pre-Construction Meeting 2 1 1
1.3 Pre-construction Photos 1 4
Man Hour Total 1 5 6 1
Total Fees $397.62 $1,396.35 $1,547.34 $152.25 $3,493.56 Task 2.1 Project Coordination and Correspondence
2.1.1 Interaction with City Staff 4 12
2.1.2 Progress Meetings 4 12 12 12
Task 2.2 Project Administration and Documentation
2.2.1 Document Control 12 4
2.2.2 Schedule Update Review 8
2.2.3 Statement of Working Days 4
2.2.4 Submittal Management 60
2.2.5 Request for Information Management 12
2.2.6 Change Order Management & Cost Control 2 8
2.2.7 Monthly Payment Review & Cost Control 12
2.2.8 Claims Management 1 8
2.2.9 Labor Compliance 0 48
Task 2.3 Construction Observation Services / Inspection Services
2.3.1 Field Inspection and Daily Reporting 24 336
2.3.2 Storm Water Pollution Prevention Plan(SWPPP) Monitoring 8 12 Task 2.4 Project Control Monument Staking
2.4.1 Project Control Monument Staking (Not Included)
Man Hour Total 11 180 360 64
Total Fees $4,373.82 $50,268.60 $92,840.40 $9,744.00 $157,232.82
3.1 Final Inspection & Notice of Completion 4 8
3.2 Prepare & Recommend Final Payment Request 4 1
3.3 Review & Submit As-Builts 4 4
3.4 Deliver Project Files 1 1
Man Hour Total 0 13 12 2
Total Fees $0.00 $3,630.51 $3,094.68 $304.50 $7,029.69
Man Hour Total Tasks 1 - 3 12 198 378 67
Total Fees Tasks 1 - 3 $4,771.44 $55,295.46 $97,482.42 $10,200.75 $167,756.07 Notes and Assumptions: Other Direct Costs
1. NV5 employees hourly rates include project-related overhead, profit, safety equipment, vehicles, laptops, and cell phones.
2. Cost proposal is based on 8-hour shifts according to the Caltrans 5-Day Working Calendar. Overtime hours will be paid in accordance with applicable labor law and prevailing wage rates. Office Expenses $0.00
3. Adjustments to this estimate may be required if the actual schedule requires more or less construction management services than proposed.
5. Time extensions to the project may result in additional Construction Managemnent services & fees. Total Proposal Costs $167,756.07
6. This estimate is based on the specific scope of work described for the Septage Receiving Station Project 24WDWW03, E3K30400 (Plant No. 3)
7. * Classifications requiring prevailing wage are subject to the provisions set forth in the latest DIR determination.
8. This cost estimate includes services for dispute resolution through project acceptance. Services for claims after acceptance will be provided at additional costs.
4. This cost estimate is based on the project being completed within 120 working days with a part time Resident Engineer Fee Proposal for CM and Inspection Services - Wastewater Treatment Plant No. 3 Septage - PROJECT NO. 25WDWW03, E3K30400 Prepared for The City of Bakersfield
TASK I: PRECONSTRUCTION SERVICES
TASK 2: CONSTRUCTION MANAGEMENT SERVICES DURING CONSTRUCTION TASK 3: POST CONSTRUCTION & PROJECT CLOSEOUT SERVICES
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent – Agreements TO: Honorable Mayor and City Council
FROM: Darin Budak, Recreation and Parks Director
DATE: October 30, 2026
SUBJECT: Agreement for Acquisition and Development of Westbridge at Seven Oaks Park
1. Approve Agreement with Bolthouse Land Company, LLC for the acquisition and development of Westbridge at Seven Oaks Park located within Village “D” of the West Ming Specific Plan.
2. Appropriate $552,992.00 Park Improvement Fund balance from Southwest Developer Reimbursement – Zone 1 for the reimbursement to Bolthouse Land Company, LLC for the acquisition and development of Westbridge at Seven Oaks Park. (Ward 5)
RECOMMENDATION:
Staff recommends approval of the agreement and appropriation.
BACKGROUND:
On August 15, 2007, City Council adopted Resolution Nos. 161-07, 162-07, 163-07, and 164-07, approving a 2,182-acre project generally bounded by Buena Vista Road, White Lane, Allen Road, and the Union Pacific Railroad, commonly referred to as the West Ming Project (“West Ming”). By Resolution No. 163- 07, City Council also approved the West Ming Specific Plan (the “Specific Plan”).
The Specific Plan establishes six residential villages identified as Villages “A” through “F,” along with a Village Center District and a Special Use District. The Specific Plan also provides for the development of various parks within the Villages and the Village Center District.
Bolthouse Land Company, LLC (“Master Planner”) is developing Village “D” within West Ming and is required to develop and dedicate a public park. The intent of the parties is to set forth the covenants and conditions governing Master Planner’s development and dedication to the City of a minimum 6.00-acre public park within Village “D” (the “Park”).
Under the terms and conditions of the Agreement, Master Planner will construct the Park in substantial compliance with the specifications described within the Agreement, dedicate the Park to the City as a public park, and provide for private maintenance of the Park by the applicable homeowners association.
Performance under the Agreement will satisfy Master Planner’s parkland dedication requirements and park development and improvement requirements for Village “D,” including requirements under Chapters
15.80 and 15.82 of the Bakersfield Municipal Code and Section 9.1 of the Specific Plan, including implementation measures P-1 through P-6.
The City of Bakersfield Planning Director has found that the Agreement and the acquisition contemplated by the Agreement are consistent with the Specific Plan and the Metropolitan Bakersfield General Plan.
The transfer of ownership interests in the Park for park purposes is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15325 (Class 25). In addition, development of the Park site is categorically exempt under CEQA Guidelines Sections 15303 (Class 3) and 15304 (Class 4).
The Master Planner, with CITY-approved Park Improvement specifications shall commence construction of the Park prior to the issuance of the 250th single-family residential building for Village D. Master Planner shall complete construction of Park no later than 2 years following the commencement of construction unless extension is granted in writing by the CITY and approved by CITY Council.
The only payment the City will make to Master Planner for development of the Park is a refund of park development fees the City previously collected from the applicable Zone of Benefit. The total refund amount is $1,105,984.00 and includes fees collected from Phase 1 of the Park Center at Seven Oaks apartment project.
The reimbursement schedule is as follows: the City will pay one-half of the refund ($552,992) within forty-five (45) days after the Agreement is executed. The City will pay the remaining one-half ($552,992) within forty-five (45) days after the City issues the building permit approval authorizing construction of the Park.
The CITY and Master Planner agree that no additional park development fees under Chapters 15.80 and
15.82 of the Bakersfield Municipal Code will be charged or collected by the City from the Zone of Benefit for the Park. The City acknowledges that Master Planner intends to recover Park-related property value and improvement costs by collecting funds from merchant builders and/or other developers who purchase land from Master Planner within the Zone of Benefit.
FISCAL IMPACT:
The Westbridge at Seven Oaks Park acquisition and developer obligation is funded through the Park Improvement Fees Southwest Developer Reimbursement – Zone 1, there is no impact to the General Fund.
COUNCIL GOAL:
Community Character & Quality of Life
Reliable Infrastructure
Innovative and Efficient City Government
ATTACHMENTS:
1. Westbridge – Park Development Agmt
2. Park Fees Collected in Zone of Benefit Village D
Park Fees Paid Report W/Address Data
As of 2026-08-18 13:24:02 Pacific Standard Time/PST • Generated by Rajan Mistry Filtered By
Show: All fees
Date Field: Fee Paid Date equals Previous 2 FY (1/1/2024 to 12/31/2025) AR Ledger Account Name contains Park
Type Fee Template Name AR Ledger Account Name Permit: TRACT PHASE Permit: Number Total Fee Paid
Date
Fee:
Created
Date
Permit:
Created
Date
Permit: TRACT
LOT Permit: Address Permit: Unit
Permit: TRACT
NUMBER
Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013950 $75,408.00 11/25/2028/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG P Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013894 $75,408.00 12/19/2028/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG K Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013888 $75,408.00 7/2/2025 8/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG D Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013887 $75,408.00 6/18/20258/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG C Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013949 $37,704.00 10/31/2028/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG M Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013885 $50,272.00 6/4/2025 8/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG A Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013953 $75,408.00 12/5/20258/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG Q Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013952 $37,704.00 12/23/2028/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG R Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013893 $75,408.00 10/17/2028/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG J Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013886 $37,704.00 6/18/20258/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG B Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013891 $75,408.00 9/16/20258/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG G Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013954 $75,408.00 12/12/2028/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG S Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013890 $75,408.00 8/29/20258/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG F Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013947 $37,704.00 10/31/2028/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG L Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013889 $75,408.00 8/4/2025 8/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG E Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 2300013892 $75,408.00 9/30/20258/26/2024 8/25/2024 3510 VILLAGE CENTER PKWY BLDG H Park Fee (South West) Subdivision - Park Fee (South West) Subdivision - Park Fee (South West) 00 2300013951 $75,408.00 11/17/2028/26/2024 8/25/2024 0 3510 VILLAGE CENTER PKWY BLDG N 0 $1,105,984.00
Confidential Information - Do Not Distribute
Copyright © 2000-2026 salesforce.com, inc. All rights reserved. 1649255
Fee: Number
1835463
1706880
1728067
1636854
1125253
1687089
1520061
1560494
1373748
1398907
1291534
1156458
1174694
1186466
1189273
1210858
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Phillip W. Burns, Development Services Director
DATE: November 2, 2026
SUBJECT: Encroachment Agreement with Mojave Pipeline, Kern River Gas, LGI Homes-California, and City of Bakersfield for Tract 7471.
The City of Bakersfield is requesting to enter into an encroachment agreement with Mojave Pipeline Company, LLC, Kern River Gas Transmission Company, and LGI Homes-California, LLC to allow the construction of street, sewer, and storm drain improvements over an 30” High Pressure Gas Pipeline (Ward 3).
RECOMMENDATION:
Staff recommends approval of the Encroachment Agreement.
BACKGROUND:
LGI Homes-California, LLC will be entering into an improvement agreement with the City of Bakersfield for the construction of public improvements associated with Tract 7471. A key part of these improvements is the construction of sewer lines, storm drain lines, and street improvements that will be cross over the existing 30” High Pressure Gas Pipeline. Once completed, the public improvements will be maintained by the City of Bakersfield.
The improvement plans have been reviewed by both the City and Mojave Pipeline Company, LLC. For the plans to be approved by the City, the developer must obtain final permission from Mojave Pipeline Company. To address this, Mojave Pipeline Company, and the City have prepared an encroachment agreement, which must be executed between the City, Mojave Pipeline Company, Kern River Gas Transmission Company, and LGI Homes-California, LLC to allow the improvements to be built across the gas line.
The Development Services Department has reviewed the encroachment agreement and is recommending that the City Council approve the license agreement. This is the final step needed to comply with project requirements and allow the developer to proceed with construction of the improvements.
FISCAL IMPACT:
There will be no financial impact to the City. The proposed improvements will be bonded for by the developer and they will pay all required fees to Mojave Pipeline Company for processing this license agreement.
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
Encroachment Agreement
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Daniel R. Maldonado, Water Director
DATE: November 3, 2026
SUBJECT: Amendment No. 1 to Agreement No. WR26-005 with DXP Enterprise (extend the term by one year and increase compensation by $100,000; revised not to exceed $200,000) to provide On-Call Pump Repair & Maintenance for the Wastewater Division.
RECOMMENDATION:
Staff recommend approval of amendment.
BACKGROUND:
The Wastewater Division operates and maintains a variety of pumps throughout Wastewater Treatment Plants No. 2 and No. 3 that are essential to daily treatment operations. These pumps require routine maintenance, repairs, and occasional emergency services to ensure reliable operation and minimize equipment downtime. This on-call pump repair and maintenance services agreement allows the Division to address equipment failures in a timely manner, maintain operational efficiency, and reduce the risk of disruptions to wastewater treatment processes.
On February 5, 2026, the City entered into Agreement No. WR26-005 with DXP Enterprise, Inc. (DXP) to provide on-call pump repair and maintenance services for the Wastewater Division. DXP was selected through a formal Request for Qualifications process and awarded an initial one-year agreement. Since the agreement's execution, DXP has performed various maintenance and repair services at Wastewater Treatment Plants No. 2 and No. 3, including rebuilding tertiary influent pumps, replacing seals on raw water pumps at Wastewater Treatment Plant No. 2, performing laser alignment of agitation air motors at Wastewater Treatment Plant No. 3, and procuring replacement parts for Vogelsang pump rebuilds.
Additionally, DXP serves as a sole-source supplier for Vogelsang pumps, providing the Wastewater Division with access to specialized equipment and replacement parts.
At this time, due to the continued need for on-call pump repair and maintenance services to support proper facility operations, staff recommend extending the term by one year and increasing compensation by $100,000, for a revised total not to exceed $200,000. This adjustment is in accordance with the original Agreement and will allow the Wastewater Division to continue addressing routine on-call services without interruption to service.
FISCAL IMPACT:
Sufficient funds are budgeted in the Sewer Enterprise Fund for this amendment, therefore, there is no impact to the City General Fund associated with this amendment.
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
1. Amendment No. 1
2. Exhibit B
1122 Carrier Pkwy Ave • Bakersfield • CA 93308
Phone (661) 322-9800
www.CortechDXP.com
P U M P S • M E C H A N I C A L S E A L S • C O M P R E S S O R S • M O T O R S • G E A R R E D U C E R S P A C K A G E D S Y S T E M S • E N G I N E E R E D S K I D S
Standard Rate Sheet 2026
PERSONNEL PER HOUR:
Field Mechanic
S/T
$150.00
O/T
$225.00
D/T
$300.00
Electronic Balancing $150.00 $225.00 $300.00
Machine work $180.00 $270.00 $360.00
S/T= Standard Time ● O/T= Over Time 1.5 ● D/T= Double Time $100.00 per day
Any applicable expenses are charged out at
cost +10% as incurred by serviceman.
Laser Shaft Alignment
Belt Alignment Kit
Pressure Washer Cold- Service Truck
Pressure Washer Hot - Shop
$200.00 per hookup
$50.00 per hookup
$50.00 per service
$60.00 per service
All call outs:
Holidays: D/T:
4 Hour Minimum
8 Hour Minimum
PER DIEM
OVERNIGHT STAY
SUPPLEMENTAL
EQUIPMENT:
CALL OUTS
OVERTIME:
DOUBLETIME:
HOLIDAYS:
FUEL SURCHARGE
& HOT SHOT:
DELAY TIME:
TAXES:
CHANGE:
Will be charged after 12 hours Monday through Saturday and any hours worked on Sunday.
Double-time rates will apply on all holidays recognized by DXP/ Cortech Engineering.
A fee of $2.00 per mile will be charged for the use of service trucks. Freight and hot-shot services will be invoiced when applicable.
Time expended waiting for customer transportation, stand-by, weather, materials, parts, etc., will be invoiced at the respective rate listed above.
All rates and prices provided herein are exclusive of applicable local, or county, state, federal, country taxes. Any applicable taxes will be added to each invoice and are the responsibility of the costumer.
Rates are subject to change without notice.
Will be charged after 8 hours Monday through Friday and the first 12 hours on Saturday.
11/3/2026
ADMINISTRATIVE REPORT
MEETING DATE: November 18, 2026 AGENDA CATEGORY: Consent - Agreements TO: Honorable Mayor and City Council
FROM: Daniel R. Maldonado, Water Director
DATE: November 3, 2026
SUBJECT: Amendment No. 1 to Agreement No. WR26-006 with Surface Pumps (extend the term by one year and increase compensation by $100,000; revised not to exceed $200,000) to provide On-Call Pump Repair & Maintenance for the Wastewater Division.
RECOMMENDATION: