CITY COUNCIL
SPECIAL MEETING
Agenda
May 07, 2025, 5:00 PM
Mayor
Mayor Pro Tem
Councilmember
Councilmember
Councilmember
Alejandra Avila
Daniel Damian
Jean M. Ayala
Emmanuel J. Estrada
Manuel Lozano
Welcome to your City Council Meeting
We welcome your interest and involvement in the City’s legislative process. This agenda includes information about topics coming before the City Council and the action recommended by city staff. You can read about each topic in the staff reports, which are available on the city’s website and in the Office of the City Clerk.
Please note that, in the event of a technical issue causing a disruption in the call-in option or internet-based option, the meeting will continue unless otherwise required by law, such as when a Board Member is attending the meeting virtually pursuant to certain provisions of the Brown Act. Electronic devices are to be turned off while meetings are in session.
How to watch
The City of Baldwin Park provides two ways to watch a City Council meeting:
In Person
Most City Council meetings take
place at City Hall, 14403 E. Pacific
Ave., Baldwin Park, CA 91706
Online
Audio streaming will be available at
https://www.youtube.com/channel/UCFLZ0_dDFRjy59rhiDZ13Fg/featured?view_as=subscriber http://baldwinpark.granicus.com/ViewPublisher.php?view_id=10 Reasonable Accommodations
Individuals with disabilities may request an agenda packet in appropriate alternative formats as required by the Americans with Disability Act of 1990. Reasonable accommodations and auxiliary aids will be provided to effectively allow participation in the meeting. Please contact the City Clerk’s Office at (626) 960-4011.
Public Comments
The public is encouraged to address the City Council or any of its Agencies listed on this agenda on any matter posted on the agenda. In accordance with Chapter 39 of the Baldwin Park Municipal Code, Speakers must address the Council as a whole and refrain from making impertinent, slanderous, or profane remarks or disrupt the peace of the meeting.
Speaker cards are available at the podium and by request with the City Clerk.
Public Communication
There is a three-minute speaking time limit. This is the time set aside to address the City Council. Please notify the City Clerk if you require the services of an interpreter. No Action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The legislative body or its staff may: 1) Briefly respond to statements made or questions asked by persons; or 2) Direct staff to investigate and/or schedule matters for consideration at a future meeting. [Government Code §54954.2] If you wish to comment on agenda items and are unable to physically appear in person, please email your name, place of residence, item number or topic and a phone number where you will be available between the hours of 7:00 PM during City Council Meetings to [email protected]
CALL TO ORDER
ROLL CALL
PUBLIC COMMUNICATIONS
OPEN SESSION/STUDY SESSION
RECESS CLOSED SESSION
1. Conference with Legal Counsel – Existing Litigation
Pursuant to paragraph (1) of subdivision (d) of Government Code Section 54956.9:
A. Case: Carolina Ibarra v. City of Baldwin Park
Los Angeles County Superior Court Case No. 24PSCV03015
B. Case: Zendejas, William v. City of Baldwin Park WCAB Case No. ADJ16742681 Worker’s Compensation Claim No.: 22-166598 (DOI: CT 05/30/2007-08/08/2022)
2. Public Employee Appointment § 54957(b)(1)
Title: City Attorney
3. Public Employee Appointment § 54957(b)(1)
Position: Chief Executive Officer
ADJOURNMENT
CERTIFICATION
I, Christopher Saenz, City Clerk of the City of Baldwin Park hereby certify that, under penalty of perjury under the laws of the State of California that the foregoing agenda was posted on the City Hall bulletin board not less than 72 hours prior to the meeting. Dated this 1st day of May, 2025
Christopher Saenz
City Clerk
For further information regarding agenda items, please contact the office of the City Clerk at (626) 960-4011 ext. 466 or via e-mail at [email protected]. In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the Public Works Department or Risk Management at (626) 960-4011. Notification 48 hours prior to the meeting will enable staff to make reasonable arrangements to ensure accessibility to this meeting. (28 CFR 34.102.104 ADA TITLE II)
CITY COUNCIL
REGULAR MEETING
Agenda
May 07, 2025, 7:00 PM
Mayor
Mayor Pro Tem
Councilmember
Councilmember
Councilmember
Alejandra Avila
Daniel Damian
Jean M. Ayala
Emmanuel J. Estrada
Manuel Lozano
Welcome to your City Council Meeting
We welcome your interest and involvement in the City’s legislative process. This agenda includes information about topics coming before the City Council and the action recommended by city staff. You can read about each topic in the staff reports, which are available on the city’s website and in the Office of the City Clerk.
Please note that, in the event of a technical issue causing a disruption in the call-in option or internet-based option, the meeting will continue unless otherwise required by law, such as when a Board Member is attending the meeting virtually pursuant to certain provisions of the Brown Act. Electronic devices are to be turned off while meetings are in session.
How to watch
The City of Baldwin Park provides two ways to watch a City Council meeting:
In Person
Most City Council meetings take
place at City Hall, 14403 E. Pacific
Ave., Baldwin Park, CA 91706
Online
Audio streaming will be available at
https://www.youtube.com/channel/UCFLZ0_dDFRjy59rhiDZ13Fg/featured?view_as=subscriber http://baldwinpark.granicus.com/ViewPublisher.php?view_id=10 Reasonable Accommodations
Individuals with disabilities may request an agenda packet in appropriate alternative formats as required by the Americans with Disability Act of 1990. Reasonable accommodations and auxiliary aids will be provided to effectively allow participation in the meeting. Please contact the City Clerk’s Office at (626) 960-4011.
Public Comments
The public is encouraged to address the City Council or any of its Agencies listed on this agenda on any matter posted on the agenda or on any other matter within its jurisdiction. In accordance with Chapter 39 of the Baldwin Park Municipal Code, Speakers must address the Council as a whole and refrain from making impertinent, slanderous, or profane remarks or disrupt the peace of the meeting. Speaker cards are available at the podium and by request with the City Clerk.
Public Communication
There is a three-minute speaking time limit. This is the time set aside to address the City Council. Please notify the City Clerk if you require the services of an interpreter. No Action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The legislative body or its staff may: 1) Briefly respond to statements made or questions asked by persons; or 2) Direct staff to investigate and/or schedule matters for consideration at a future meeting. [Government Code §54954.2] If you wish to comment on agenda items and are unable to physically appear in person, please email your name, place of residence, item number or topic and a phone number where you will be available between the hours of 7:00 PM during City Council Meetings to [email protected]
Notice Regarding California Environmental Quality Act (CEQA) Determinations Pursuant to CEQA, a "project" is defined as a "whole action" subject to a public agency's discretionary funding or approval that has the potential to either (1) cause a direct physical change in the environment or (2) cause a reasonably foreseeable indirect physical change in the environment. "Projects" include discretionary activity by a public agency, a private activity that receives any public funding, or activities that involve the public agency's issuance of a discretionary approval and is not
statutorily or categorically exempt from CEQA. (Pub. Res. Code § 21065.) To the extent that matters listed in this Agenda are considered "projects" under CEQA, their appropriate CEQA determination will be listed below each recommendation. If no CEQA determination is listed, it has been determined that the action does not constitute a "project" under CEQA.
CALL TO ORDER
INVOCATION
PLEDGE OF ALLEGIANCE
ROLL CALL
REPORT FROM CLOSED SESSION
ANNOUNCEMENTS
PROCLAMATIONS, COMMENDATIONS & PRESENTATIONS
Proclamation – Declaring May 2025 as Older Americans Month presented to Rosalinda Sally G Ong, a 2025 Older American Citizen of the Year Honoree.
Presentation – 2025 Senior of the Year Plaque presented to Rosalinda Sally G Ong
Presentation - California Parks and Recreation Society (CPRS) -Creating Community Award of Excellence Economic Vitality – Summer Concerts & Downtown Street Market, presented by CPRS former President Kyla Brown, CPRE
Presentation – California Parks and Recreation Society District 13 “Best of the Best” Awards – Community Hero Award presented to Sensei Tony Mojica
Proclamation – Declaring May 4 – 10, 2025 as Professional Municipal Clerks Week presented to Shirley Quinones, CMC, Chief Deputy City Clerk
PUBLIC COMMUNICATIONS
CONSENT CALENDAR
All items listed are considered to be routine business by the City Council and will be approved with one motion. There will be no separate discussion of these items unless a City Councilmember so requests, in which case, the item will be removed from the general order of business and considered in its normal sequence on the agenda.
1. City of Baldwin Park’s Warrants and Demands
Staff recommends that the City Council ratify the attached Warrants and Demands Register.
2. Meeting Minutes of April 16, 2025
It is recommended that the City Council approve the following meetings minutes of the Special City Council Meeting, Regular City Council Meeting, Finance Authority Meeting and the Housing Authority Meeting held on April 16, 2025.
3. Resolution No. 2025-006 Initiating the Proceedings and Ordering Preparation of the Engineer’s Report for the Parks Maintenance Assessment District for FY2025-2026 Staff recommends that Council adopt Resolution No. 2025-006entitled, “A Resolution of the City Council of the City of Baldwin Park, California, authorizing the initiation of the proceedings and ordering the preparation of the Engineer’s Report for the FY 2025 -2026 levy of annual assessments for the Parks Maintenance Assessment District pursuant to the provisions of Division 15, Part 2 of the State of California Streets and Highways Code.”
4. Resolution No. 2025-007 Initiating the Proceedings and Ordering Preparation of the Engineer’s Report for the Citywide Landscape and Lighting Maintenance Assessment District for FY2025- 2026
Staff recommends that Council adopt Resolution No. 2025 -007 entitled, “A Resolution of the City Council of the City of Baldwin Park, California, authorizing the initiation of the proceedings and ordering the preparation of the Engineer’s Report for the FY2025-2026 levy of annual assessments for the City of Baldwin Park Landscaping and Lighting Maintenance District pursuant to the provisions of Division 15, Part 2 of the State of California Streets and Highway Code.”
5. Request for Appropriation of Funds for Underground Waste Oil Tank Abandonment and Concrete Deck Repair at Clarifier City Yard Facility
It is recommended that the City Council:
1. Authorize the Director of Finance to reappropriate $23,830.00 within Fund #402 – Fleet Services and appropriate $21,780.00 to Fund #245 – Proposition C for FY 2024/2025 to cover a total of $45,610.00 in repair costs; and
2. Authorize the Director of Finance to make necessary budget adjustments to allow payments; and
3. Authorize the Acting Director of Public Works, or his designee, to complete all the proper documentation to process purchase requisition for selected vendors, Premiere Fueling Services Inc. for underground waste oil tank removal in an amount -not-to exceed $23,830.00 and Sager Construction Inc. for surrounding concrete repairs in an amount-not-to exceed $21,780.00.
6. Approve and Adopt Resolution No. 2025 -009 Approving the Industrial Disability Retirement (IDR) for William Zendejas a Local Safety Member
It is recommended that the City Council adopt and approve Resolution No. 2025 -009 entitled, “A
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK, APPROVING
THE INDUSTRIAL DISABILITY RETIREMENT (IDR) FOR WILLIAM ZENDEJAS A LOCAL SAFETY MEMBER”.
REPORTS OF OFFICERS
7. Final Feasibility Report for Grade Separation at Ramona Blvd and Metrolink Railroad It is recommended that the City Council
1. Receive and file the Technical Feasibility Report for the Ramona Blvd/Metrolink Railroad Grade Separation, also known as Project Study Report Equivalent (PSRE), attached herein.
2. Acknowledge that the grade separation is technically feasible at an estimate cost of $167.9 million over an eight-year period with 2025 as the base year.
3. Direct Staff to pursue project development partnerships with LA Metro, Metrolink, Caltrans, SGV Council of Governments and others.
4. Direct Staff to pursue funding grants with the county, state, and federal agencies enlisting the support of our elected officials.
5. Thank LA Metro and its project team for undertaking the preparation of the feasibility analysis.
8. Status and update on the Apex Officer – Pro Training Simulator It is recommended that the City Council receive and file this report.
PUBLIC HEARING
9. First Reading and Introduction of an Ordinance No. 1513 to Amend Sections 153.040.070, 153.070.020, 153.120.350, 153.120.360 and 153.120.370 of the Baldwin Park Municipal Code Relating to Accessory Dwelling Units and Junior Accessory Dwelling Units and Finding the Action to be Statutorily Exempt from CEQA
It is recommended to continue this item to a date uncertain.
10. Appeal of the Planning Commission’s Decision to approve a Conditional Use Permit to allow a recreational facility (indoor/outdoor soccer facility) use, and a Design Review Application , and finding that the proposed project is categorically exempt from the California En vironmental Quality Act (CEQA) per State CEQA Guidelines section 15332, Class 32 – Infill Development. (Location: 14412 & 14424 Joanbridge Street; Applicant: Trinidad Campbell; Case Number: CP 23-05, PR 23-21).
It is recommended that the City Council:
1. Conduct a public hearing.
2. Adopt Resolution No. 2025 -008 DENYING THE APPEAL AND UPHOLDING THE
DECISION OF THE PLANNING COMMISSION OF THE CITY OF BALDWIN
PARK AND APPROVE A CONDITIONAL USE PERMIT TO ALLOW
RECREATIONAL FACILITY (INDOOR/OUTDOOR SOCCER FACILITY) USE, AND A DESIGN REVIEW APPLICATION. (LOCATION: 14412 & 14424 JOANBRIDGE STREET; APPLICANT: TRINIDAD CAMPBELL; CASE NUMBER:
CP 23 -05, PR 23 -21), AND FINDING THE PROPOSED PROJECT IS
CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL
QUALITY ACT (CEQA) PURSUANT TO STATE CEQA GUIDELINES SECTION 15332.”
CITY COUNCIL ACTING AS SUCCESSOR AGENCY OF THE DISSOLVED COMMUNITY
DEVELOPMENT COMMISSION
CITY COUNCIL / CITY CLERK / CITY TREASURER / STAFF REQUESTS & COMMUNICATION
ADJOURNMENT
CERTIFICATION
I, Christopher Saenz, City Clerk of the City of Baldwin Park hereby certify that, under penalty of perjury under the laws of the State of California that the foregoing agenda was posted on the City Hall bulletin board not less than 72 hours prior to the meeting. Dated this 1st day of May 205..
Christopher Saenz
City Clerk
For further information regarding agenda items, please contact the office of the City Clerk at (626) 960-4011 ext. 466 or via e-mail at [email protected]. In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the Public Works Department or Risk Management at (626) 960-4011. Notification 48 hours prior to the meeting will enable staff to make reasonable arrangements to ensure accessibility to this meeting. (28 CFR 34.102.104 ADA TITLE II)
STAFF REPORT
ITEM NO. _____1_____
TO: Honorable Mayor and Members of the City Council
FROM: Rose Tam, Director of Finance
PREPARED BY: Ana Zhang, Senior Finance Clerk
DATE: May 7, 2025
SUBJECT: City of Baldwin Park’s Warrants and Demands
SUMMARY
Attached is the Warrants and Demands Register for the City of Baldwin Park to be ratified by the City Council.
RECOMMENDATION
Staff recommends that the City Council ratify the attached Warrants and Demands Register.
FISCAL IMPACT
The payroll for the last period was $610,063.35 and the attached General Warrants Register was $4,516,517.26 for a total amount of $5,126,580.61.
BACKGROUND
The attached Claims and Demands report format meet the required information as set out in the California Government Code. Staff has reviewed the requests for expenditures for the appropriate budgetary approval and for the authorization from the department head or its designee. Pursuant to Section 37208 of the California Government Code, the Chief Executive Officer or his/her designee does hereby certify to the accuracy of the demands hereinafter referred. Payments released since the previous City Council m eeting and the following is a summary of the payment released:
1.The last payroll of the City of Baldwin Park consists of check numbers 202874 to 202890 Additionally, Automated Clearing House (ACH) Payroll deposits were made on behalf of City Employees from control number 54156 to 54448 for the period March 30, 2025, through April 12, 2025 inclusive; these are presented and hereby ratified in the amount of $610,063.35.
2.General Warrants, with the electronic fund transfer (EFT) bank drafts in the amount of $2,606,780.67 and checks from 250707 to 250990 in the amount of $1,909,736.59 for the period of April 8, 2025 to April 28, 2025, inclusive; in the total amount of $4,5 16,517.26 constituting of claims and demands against the City of Baldwin Park, are herewith presented to the City Council as required by law, and the same hereby ratified.
LEGAL REVIEW
Not Applicable
ATTACHMENTS
1. Check Register
Amount
250720 04/10/2025 CITY OF EL MONTE FEB 2025-FUEL FOR TRANSIT SERVICES 244-50-580-51100-15525 188.58$ 250721 04/10/2025 CORY SILVA DEPOSIT REFUND JULIA MCNEILL SENIOR CENTER 4/04/25 501-60-000-22333-00000 500.00$ 250718 04/10/2025 CHICAS GRAPHICS AND DESIGN NO PARKING SIGN 240-50-551-53100-15705 413.44$ 250718 04/10/2025 CHICAS GRAPHICS AND DESIGN NO PARKING SIGN 240-50-551-53100-15705 332.55$ 250719 04/10/2025 CITIES DIGITAL INC RENEWAL OF WORM BACKUP ADD-ON FOR LASERFICHE 401-10-140-53379-00000 12,000.00$ 250717 04/10/2025 CARLOS VALLE MAR 2025-CITYWIDE JANITORIAL SERVICES 100-60-620-53371-00000 5,500.00$ 250717 04/10/2025 CARLOS VALLE MAR 2025-CITYWIDE JANITORIAL SERVICES 245-60-620-53371-15882 1,300.00$ 250717 04/10/2025 CARLOS VALLE MAR 2025-CITYWIDE JANITORIAL SERVICES 252-60-620-53371-00000 6,968.00$ 250715 04/10/2025 BMO BANK N.A. AUTOMATION PERMIT EXEMPT 402-50-590-53370-00000 95.98$ 250715 04/10/2025 BMO BANK N.A. SUPPLIES FOR PUBLIC WORK 402-50-590-53371-00000 501.92$ 250716 04/10/2025 CALIFORNIA PALMS FLAME RETARDANT MESH FOOD WALLS-DOWNTOWN ST.MARKET 100-60-610-53100-16101 4,707.79$ 250715 04/10/2025 BMO BANK N.A. AUTOMATION PERMIT EXEMPT 402-50-590-53370-00000 100.06$ 250715 04/10/2025 BMO BANK N.A. AUTOMATION PERMIT EXEMPT 402-50-590-53370-00000 92.92$ 250715 04/10/2025 BMO BANK N.A. AUTOMATION PERMIT EXEMPT 402-50-590-53370-00000 100.06$ 250715 04/10/2025 BMO BANK N.A. MONTHLY SUBSCRIPTION FOR PUBLIC WORK 240-50-510-53330-00000 29.99$ 250715 04/10/2025 BMO BANK N.A. GROUNDBREAKING GIFTS 245-50-520-58100-15093 4,380.48$ 250715 04/10/2025 BMO BANK N.A. PARTS FOR YARD-PUBLIC WORK 402-50-590-53100-00000 146.37$ 250715 04/10/2025 BMO BANK N.A. MANAGEMENT DUE 100-20-210-53330-00000 150.00$ 250715 04/10/2025 BMO BANK N.A. CERTIFICATE OF ACHIEVEMENT REVIEW FY24 100-20-210-53330-00000 610.00$ 250715 04/10/2025 BMO BANK N.A. ACT#923225-INTERNET-S. HOMES-1/19-3/18/2025 100-60-620-53403-55003 297.62$ 250714 04/10/2025 BMO BANK N.A. SPLIT KEYBOARD 401-10-140-53390-00000 110.24$ 250714 04/10/2025 BMO BANK N.A. ASUS ROUTER 401-10-140-53390-00000 186.14$ 250714 04/10/2025 BMO BANK N.A. CRUCIAL MEMORY FOR LAPTOP 401-10-140-53390-00000 164.00$ 250714 04/10/2025 BMO BANK N.A. RETURN OF ASUS ROUTER 401-10-140-53390-00000 (186.14)$ 250714 04/10/2025 BMO BANK N.A. PLANTRONICS ELECTRONIC HOOK 401-10-140-53390-00000 33.06$ 250714 04/10/2025 BMO BANK N.A. CRUCIAL MEMORY FOR LAPTOP 401-10-140-53390-00000 213.21$ 250714 04/10/2025 BMO BANK N.A. DUO ESSENTIALS 2/23-3/23/25 401-10-140-53370-11602 210.00$ 250714 04/10/2025 BMO BANK N.A. WEBINAR 500-3/16-4/15/2025 401-10-140-53370-11602 49.44$ 250714 04/10/2025 BMO BANK N.A. MISC. SERVER PARTS 401-10-140-53390-00000 459.74$ 250713 04/10/2025 BMO BANK N.A. SWAT EQUIPMENT 100-30-340-53100-13040 290.00$ 250714 04/10/2025 BMO BANK N.A. ICOULD STORAGE-RENEWS 4/14/2025 401-10-140-53330-00000 0.99$ 250714 04/10/2025 BMO BANK N.A. DUO ESSENTIALS 3/23-4/23/2025 401-10-140-53370-11602 210.00$ 250713 04/10/2025 BMO BANK N.A. REPLENISHMENT FOR TRANSPONDERS 100-30-340-51101-00000 45.00$ 250713 04/10/2025 BMO BANK N.A. REPLENISHMENT FOR TRANSPONDERS 100-30-340-51101-00000 45.00$ 250713 04/10/2025 BMO BANK N.A. REPLENISHMENT FOR TRANSPONDERS 100-30-340-51101-00000 45.00$ 250713 04/10/2025 BMO BANK N.A. REDACTION REFRESH SERIES-REFUND 100-30-310-53200-00000 (1,000.00)$ 250713 04/10/2025 BMO BANK N.A. SUBSCRIPTION FOR SOCIAL MEDIA-RENEWS 4/25/2025 100-30-310-53330-00000 2.99$ 250713 04/10/2025 BMO BANK N.A. REPLENISHMENT FOR TRANSPONDERS 100-30-340-51101-00000 45.00$ 250713 04/10/2025 BMO BANK N.A. REDACTION REFRESH SERIES - AGENCY REG. 100-30-310-53200-00000 1,000.00$ 250713 04/10/2025 BMO BANK N.A. CHEMICAL AGENT INSTRUCTOR COURSE 100-30-310-53200-00000 1,440.00$ 250713 04/10/2025 BMO BANK N.A. HOTEL BOOKING FEE 100-30-310-53200-00000 17.99$ 250713 04/10/2025 BMO BANK N.A. 30 PIECES POLICE MOURNING BAND STRIPE 100-30-310-53100-00000 19.82$ 250713 04/10/2025 BMO BANK N.A. HOTEL BOOKING FEE 100-30-310-53200-00000 217.13$ 250713 04/10/2025 BMO BANK N.A. FLASHBAND LESS LETHAL INS. COURSE 4/2/2025 100-30-310-53200-00000 350.00$ 250712 04/10/2025 BALDWIN PARK FLOWERS & GIFTS LINEN&FLORAL FOR GREENWAY GROUNDBREAKING CEREMONY 100-25-299-53370-00000 369.34$ 250712 04/10/2025 BALDWIN PARK FLOWERS & GIFTS LINEN&FLORAL FOR GREENWAY GROUNDBREAKING CEREMONY 100-25-299-53370-00000 150.00$ 250713 04/10/2025 BMO BANK N.A. SPIT HOOD FOR PATROL 100-30-310-53100-00000 211.65$ 250709 04/10/2025 ALFREDO ROMERO DJ ENTERTAINMENT FOR ZOCALO PARK 4/11/2025 110-60-685-51101-00000 250.00$ 250710 04/10/2025 AUTOMATION SOLUTIONS, INC. ELECTRICAL REPAIRS MORGAN PARK 04/01/2025&3/17/25 100-60-620-53371-00000 1,881.03$ 250711 04/10/2025 AXON ENTERPRISE, INC CIP22-012 PD MOBILE COMMAND UPGRADES: 275-30-765-58110-53005 35,442.16$ Check Register
City of Baldwin Park, CA By (None)
Payment Dates 4/8/2025 - 4/28/2025
Payment Number Payment Date Vendor Name Description (Item) Account Number 250707 04/10/2025 ABSOLUTE SECURITY INTERNATIONAL CORP FEB 2025-SECURITY SRVC AT SENIOR CENTER&ARC 501-60-000-22328-00000 1,584.00$ 250708 04/10/2025 ALBERT MORRELL DEPOSIT REFUND WALNUT CREEK NATURE PARK 3/29/25 501-60-000-22333-00000 150.00$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250747 04/10/2025 KRIS GONZALEZ DEPOSIT REFUND SR. CENTER CELEBRATION HALL 3/29/25 501-60-000-22333-00000 500.00$ 250748 04/10/2025 LESLIE'S POOLMART INC SUPPLIES FOR AQUATIC CENTER POOL 252-60-620-53100-00000 15.17$ 250749 04/10/2025 LEWIS ENGRAVING INC BULLETIN BOARD SIGNS 100-30-310-53100-00000 140.02$ 250745 04/10/2025 JC'S PLUMBING & BACKFLOW SVC BACKFLOW SRVC-8/21/2024 251-50-562-51101-00000 3,089.81$ 250745 04/10/2025 JC'S PLUMBING & BACKFLOW SVC CAP WATER LINE ON RAMONA BLVD - 8/28/2024 251-50-562-51101-00000 360.00$ 250746 04/10/2025 KINGDOM CAUSES, INC. JAN 2025-OPERATIONAL COST-S. HOMES-LAHSA 270-60-691-53370-66024 67,681.86$ 250742 04/10/2025 IMAGEN, INC. CANVAS TOTE BAGS FOR DOWNTOWN ST MARKET 100-60-610-53100-16101 1,756.91$ 250743 04/10/2025 INTERMEX INC BUS TRANSPORTATION TO RIVER ST MARKETPLACE 6/12/25 275-60-726-51101-16074 1,800.00$ 250744 04/10/2025 JAMES IZZO FOOD FOR BOOTCAMP 029 STUDENTS-3/29/2025 220-30-340-53360-14880 67.73$ 250739 04/10/2025 HOME DEPOT A#23270-MATERIALS&SUPPLIES FOR RECREATION 110-60-685-53100-00000 129.52$ 250740 04/10/2025 HONEYWELL INTERNATIONAL INC. MAY 2025-MAINTENANCE CONTRACT FOR HVAC SYSTEM 100-60-620-53371-16100 7,993.25$ 250741 04/10/2025 HORTENCIA SALDANA GUERRERO DEPOSIT REFUND JULIA MCNEILL SENIOR CENTER 4/05/25 501-60-000-22333-00000 300.00$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR PARK LANDSCAPE 251-50-571-53100-00000 629.88$ 250739 04/10/2025 HOME DEPOT A#23270-MATERIALS&SUPPLIES FOR RECREATION 110-60-685-53100-00000 119.90$ 250739 04/10/2025 HOME DEPOT A#23270-MATERIALS&SUPPLIES FOR RECREATION 110-60-685-53100-00000 8.75$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 52.61$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 96.79$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 24.23$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 11.54$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR PARK LANDSCAPE 251-50-571-53100-00000 119.29$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TREE DIVISION 240-50-561-53100-00000 24.87$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR PARK LANDSCAPE 251-50-571-53100-00000 38.57$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR PARK LANDSCAPE 251-50-571-53100-00000 25.34$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR STREET MAINTENANCE 240-50-551-53100-15705 157.17$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 77.89$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR STREET LANDSCAPE 245-50-560-53100-00000 39.52$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 98.12$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TREE DIVISION 240-50-561-53100-00000 22.44$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR PARK LANDSCAPE 251-50-571-53100-00000 116.30$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 48.29$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 18.68$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TREE DIVISION 240-50-561-53100-00000 5.44$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 71.55$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR PARK LANDSCAPE 251-50-571-53100-00000 19.46$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR PARK LANDSCAPE 251-50-571-53100-00000 205.99$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR PARK LANDSCAPE 251-50-571-53100-00000 2,261.80$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TREE DIVISION 240-50-561-53100-00000 131.12$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR TREE DIVISION 240-50-561-53100-00000 196.99$ 250737 04/10/2025 HOME DEPOT A#23247-SUPPLIES FOR STREET LANDSCAPE 245-50-560-53100-00000 68.12$ 250736 04/10/2025 HLR MEDIA, LLC CITY&DEPOSIT PROJECTS-AZC25-02-03-01 100-40-440-53330-00000 792.00$ 250736 04/10/2025 HLR MEDIA, LLC CITY&DEPOSIT PROJECTS-DA24-01 501-40-000-22335-00000 248.00$ 250736 04/10/2025 HLR MEDIA, LLC DEPOSIT PROJECT-CITY NOTICE-CP 25-01 501-40-000-22335-00000 232.00$ 250733 04/10/2025 GOODWILL INDUSTRIES OF SOUTHERN CALIFORNIA NEXTGEN YOUTH EMPLOYMENT W BP CITY-OCT 2024 275-25-719-51101-17518 6,179.64$ 250734 04/10/2025 GUARDIAN ALLIANCE TECHNOLOGIES, INC. ONLINE SCREENING FOR PD APPLICANTS 100-30-310-51100-00000 92.00$ 250735 04/10/2025 HIPOLITO REYES LOPEZ MUSIC ENTERTAINMENT-BIRTHDAY CELEBRATION 04/16/25 501-60-000-22327-00000 350.00$ 250733 04/10/2025 GOODWILL INDUSTRIES OF SOUTHERN CALIFORNIA FEB 2025-NEXT GEN YOUTH EMPLOYMENT W BP CITY 275-25-719-51101-17518 6,776.75$ 250733 04/10/2025 GOODWILL INDUSTRIES OF SOUTHERN CALIFORNIA NEXTGEN YOUTH EMPLOYMENT W BP CITY-DEC 2024 275-25-719-51101-17518 5,831.92$ 250733 04/10/2025 GOODWILL INDUSTRIES OF SOUTHERN CALIFORNIA NEXTGEN YOUTH EMPLOYMENT W BP CITY-NOV 2024 275-25-719-51101-17518 6,230.73$ 250730 04/10/2025 FEDEX OFFICE PRESENTATION BOARDS FOR GREENWAY CEREMONY 04/02/25 100-25-299-53370-00000 74.52$ 250731 04/10/2025 FRONTIER COMMUNICATIONS ACT#923225-INTERNET-S. HOMES-3/23-4/22/2025 100-60-620-53403-55003 243.48$ 250732 04/10/2025 FRONTIER COMMUNICATIONS ACCT#0421945-CITY PHONE-3/28-4/27/2025 401-10-141-53403-11506 1,767.51$ 250728 04/10/2025 EDWIN CARL SMITH TILE PLAQUE FOR CITY COUNCIL 4/1/2025 100-10-100-53320-00000 18.23$ 250729 04/10/2025 ELVIA RAMOS 2 HRS RESIDENT RENTAL FEES 100-60-000-45601-00000 70.00$ 250729 04/10/2025 ELVIA RAMOS DEPOSIT REFUND ESTHER SNYDER 3/29/2025 501-60-000-22333-00000 150.00$ 250725 04/10/2025 DANIELLE BELMONTEZ DEPOSIT REFUND CANCELED EVENT-WALNUT CREEK 5/10/25 501-60-000-22333-00000 150.00$ 250726 04/10/2025 DEPORTES JALISCO INC. UNIFORMS FOR YOUTH SOCCER PARTICIPANTS 501-60-000-22326-00000 2,118.72$ 250727 04/10/2025 EASYBADGES LLC ACCESS CARDS FOR DEPARTMENT PERSONNEL 100-30-370-53100-00000 417.85$ 250723 04/10/2025 CROSSCONNECT ENGINEERING INC ASA TO ASA SOFTWARE& ASDM SOFTWARE. VPN LOGIN 401-10-140-51100-00000 2,640.00$ 250724 04/10/2025 CUIFANG DONG 4439 PARK AVE. UNIT A.BLDG-0424-3660/0724-4099 100-40-000-43400-00000 349.60$ 250722 04/10/2025 COUNTY OF LOS ANGELES DEPARTMENT OF ANIMAL CARE & CONTROL.FEB 2025-ANIMAL CONTROL SERVICES 275-30-712-51100-13250 66,506.79$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250780 04/10/2025 TRI-SIGNAL INC. REPAIR CITY HALL FIRE ALARM SYSTEM 3/30-9/29/2025 100-60-620-53371-00000 1,410.00$ 250781 04/10/2025 U.S. BANK FISCAL AGENT ANNUAL TRUSTEE FEE 3/1/25-2/28/26 660-00-000-55750-15550 1,350.00$ 250779 04/10/2025 TRIPEPI,SMITH AND ASSOCIATES, INC COMMUNICATION AND SOCIAL MEDIA SERVICES FEB. 2025 230-10-110-51100-11402 1,502.75$ 250779 04/10/2025 TRIPEPI,SMITH AND ASSOCIATES, INC REMAIING BALANCE FOR SOCIAL MEDIA SERVICES FEB 25 230-10-110-51100-11402 756.00$ 250779 04/10/2025 TRIPEPI,SMITH AND ASSOCIATES, INC COMMUNICATION AND SOCIAL MEDIA SERVICES FEB. 2025 230-10-110-51100-11402 183.75$ 250776 04/10/2025 SPARKLETTS WATER & COFFEE SUPPLIES FOR CITY YARD 100-60-620-53100-00000 265.44$ 250777 04/10/2025 SUSANA HERNANDEZ RENTAL DEPOSIT JULIA MCNEILL SENIOR CENTER 5/3/25 100-60-000-45601-00000 300.00$ 250778 04/10/2025 THE SHREDDERS PD-DESTUCTION OF PD CONFIDENTIAL DOCUMENTS 100-30-330-51101-00000 234.00$ 250775 04/10/2025 SOUTHERN CALIFORNIA GAS CO GAS-41005-CITY PARKS-14255 RAMONA 2/26-3/27/25 252-60-620-53400-00000 728.47$ 250776 04/10/2025 SPARKLETTS WATER & COFFEE SUPPLIES FOR CITY FACILITIES 100-60-620-53100-00000 844.59$ 250776 04/10/2025 SPARKLETTS WATER & COFFEE SUPPLIES FOR CITY FACILITIES 252-60-620-53100-00000 844.58$ 250774 04/10/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 133.80$ 250775 04/10/2025 SOUTHERN CALIFORNIA GAS CO GAS-31292-CITY PARKS-1209 VINELAND 2/24-3/25/25 252-60-620-53400-00000 21.78$ 250775 04/10/2025 SOUTHERN CALIFORNIA GAS CO GAS-41005-CITY PARKS-14255 RAMONA 2/26-3/27/25 252-60-620-53400-00000 2,812.60$ 250774 04/10/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 49.57$ 250774 04/10/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 143.43$ 250774 04/10/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 48.17$ 250774 04/10/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 40.78$ 250774 04/10/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 18.56$ 250774 04/10/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 224.75$ 250771 04/10/2025 PHILLIP WENER FOOD FOR BOOTCAMP 029 STUDENTS FOR 4/5/2025 220-30-340-53360-14880 111.15$ 250772 04/10/2025 SAN GABRIEL VALLEY EXAMINER ORDINANCE 1516 PUBLICATION 3/13/2025 100-10-120-53330-00000 432.00$ 250773 04/10/2025 SECTRAN SECURITY INC. SECTRAN SERVICE CASH TRANSFER TO LOOMIS APR. 2025 100-25-299-53370-12404 473.98$ 250769 04/10/2025 OSWALDO FLORES MARTINEZ RENTAL DEPOSIT-JULIA MCNEILL SENIOR CENTER 4/5/25 501-60-000-22333-00000 500.00$ 250770 04/10/2025 PALICON GROUP BACKGROUND FOR PST APPLICANT 100-30-310-51100-00000 2,250.00$ 250771 04/10/2025 PHILLIP WENER FOOD FOR BOOTCAMP 029 STUDENTS FOR 4/5/2025 220-30-340-53360-14880 25.46$ 250767 04/10/2025 JUAN E. RAMIREZ ENG-SPA INTERPRETER AND TRANSLATOR-MAR 2025 100-10-110-51101-00000 5,320.00$ 250768 04/10/2025 NICHOLS LUMBER & HARDWARE SUPPLIES FOR YOUTH SPORTS & COMMUNITY CENTER 100-60-610-53100-00000 17.60$ 250768 04/10/2025 NICHOLS LUMBER & HARDWARE SUPPLIES FOR YOUTH SPORTS & COMMUNITY CENTER 501-60-000-22326-00000 145.40$ 250765 04/10/2025 BMO BANK N.A. EQUIPMENT FOR PATROL AND/OR SWAT TEAM 100-30-340-53100-13040 290.00$ 250765 04/10/2025 BMO BANK N.A. MAT FOR DISPATCH 100-30-370-53100-00000 208.37$ 250766 04/10/2025 INTER AMERICA-RED DEVILS MEASURE BP-COMMUNITY EMPOWERMENT GRANT AWARDEE 110-10-110-53370-11610 3,393.93$ 250765 04/10/2025 BMO BANK N.A. HOTEL STAY CAPE TRAINING 5/2-5/7/2025 100-30-310-53200-00000 1,014.28$ 250765 04/10/2025 BMO BANK N.A. TRAINING REGISTRATION FOR OFFICER NUNO 100-30-310-53200-00000 375.00$ 250765 04/10/2025 BMO BANK N.A. TRAINING REGISTRATION FOR OFFICER LEAL 100-30-310-53200-00000 250.00$ 250764 04/10/2025 BMO BANK N.A. TREAT BAGS&STRESS BALLS FOR MLB EVENT 100-10-150-53370-11123 63.55$ 250764 04/10/2025 BMO BANK N.A. BUDGET RETREAT-LUNCH FOR ATTENDEES 100-10-150-53370-11123 423.00$ 250764 04/10/2025 BMO BANK N.A. TABLE COVERS,CORNUTS GUM FOR MLB EVENT 100-10-150-53370-11123 178.01$ 250761 04/10/2025 U.S. CHEMICAL STORAGE, LLC EXPLOSIVE STORAGE MAGAZINE FOR STORAGE OF 100-30-340-53100-13040 3,639.51$ 250762 04/10/2025 US BANK VOYAGER FLEET SYS GAS CARD ACCOUNT#869356121 FOR POLICE DEPT. 402-50-591-53110-16140 696.18$ 250763 04/10/2025 VISIONS RECYCLING INC RECYCLED/SPECIALIZED SPRAY PAINTS 240-50-570-53100-15705 780.57$ 250759 04/10/2025 TARGET SPECIALTY PRODUCTS HERBICIDES AND FERTILIZERS (LIQUID & GRANULAR) 251-50-560-53100-00000 599.37$ 250760 04/10/2025 THE PUN GROUP LLP FY2023-24 ANNUAL AUDIT END 6/30/2024 BILLING#5 255-20-210-51101-12420 4,367.00$ 250760 04/10/2025 THE PUN GROUP LLP FY2023-24 ANNUAL AUDIT END 6/30/2024 BILLING#5 256-20-210-51101-12420 4,428.00$ 250757 04/10/2025 SOUTHERN CALIFORNIA EDISON ELEC-PARK MAINTENANCE-14403 PACIFIC 2/24-3/24/25 252-60-620-53401-00000 1,029.56$ 250757 04/10/2025 SOUTHERN CALIFORNIA EDISON ELEC-ZOCALO-14349 PACIFIC 2/21-3/23/25 252-60-620-53401-00000 1,172.54$ 250758 04/10/2025 SOUTHERN CALIFORNIA GAS CO GAS-36006-CITY BLDG-14305 MORGAN 2/26-3/247/25 100-60-620-53400-00000 222.19$ 250756 04/10/2025 RKA CONSULTING GROUP ENGINEERING SERVICES: 11/1/2024-11/30/2024 100-40-450-51100-00000 1,365.00$ 250756 04/10/2025 RKA CONSULTING GROUP ENGINEERING SERVICES: 2/1/2025-2/28/2025 100-40-450-51100-00000 5,186.25$ 250756 04/10/2025 RKA CONSULTING GROUP ENGINEERING SERVICES: 2/1-2/28/2025 100-50-510-51100-00000 3,115.00$ 250755 04/10/2025 RICOH USA INC MAINTENANCE,OVERAGES 3 RICOH COPIERS 3/25-4/24/25 401-10-141-53371-11504 123.62$ 250755 04/10/2025 RICOH USA INC LEASE PAYMENTS FOR 3 RICOH COPIERS :3/25-4/24/25 401-10-141-58140-11504 710.12$ 250756 04/10/2025 RKA CONSULTING GROUP ENGINEERING SERVICES: 9/1/2024-9/30/2024 100-40-450-51100-00000 4,793.75$ 250752 04/10/2025 MANUEL CARRILLO, JR PRINTING SERVICES SPRING FEST 100-60-610-53320-16152 385.44$ 250753 04/10/2025 MILLER'S & ISHAMS FIRE EXTINGUISHERS FIRE EXTINGUISHER & ARROW SIGNS, ZOCALO PARK 110-60-685-53100-00000 320.83$ 250754 04/10/2025 RAILPROS, INC. CONSTRUCTION MANAGEMENT & INSPECTION 2/1-2/28/2025 255-50-520-58100-15550 26,011.83$ 250752 04/10/2025 MANUEL CARRILLO, JR PRINTING GREENWAY GROUNDBREAKING 100-25-299-53370-00000 271.99$ 250752 04/10/2025 MANUEL CARRILLO, JR PRINTING SERVICES-PRIDE 5K RUN 100-60-610-53320-16146 351.50$ 250750 04/10/2025 LILAS INC CLEANING SRVC FOR JAIL 3/26/2025 100-30-370-51101-00000 70.00$ 250751 04/10/2025 LORENZO R SALLAS REPLACEMENT PA SYSTEM FOR RECREATION 100-60-610-58110-00000 11,328.49$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250815 04/17/2025 MERRIMAC ENERGY GROUP REGULAR UNLEADED GASOLINE 8198 GALLONS 402-50-590-53110-16140 17,796.99$ 250815 04/17/2025 MERRIMAC ENERGY GROUP REGULAR UNLEADED GASOLINE 8198 GALLONS 402-50-591-53110-16140 11,857.41$ 250815 04/17/2025 MERRIMAC ENERGY GROUP REGULAR UNLEADED GASOLINE 8202 GALLONS, 402-50-590-53110-16140 17,796.98$ 250812 04/17/2025 MANUEL SAENZ PER DIEM- DUI DETECTION COURSE 4/7-4/10/2025 100-30-310-53200-00000 32.00$ 250813 04/17/2025 MARIAH TORRES REFUND-RENTAL DEPOSIT#2-3 MORGAN PARK PICNIC 4/12 501-60-000-22333-00000 100.00$ 250814 04/17/2025 MARIPOSA LANDSCAPES INC. MAR 2025-LANDSCAPE MAINTENANCE 251-50-560-51100-00000 8,968.00$ 250810 04/17/2025 LIGHTNING OIL CO., INC. & VACUUM SERVICE REMOVE AND DISPOSE OF HOUSEHOLD HAZARDOUS 258-50-551-51101-00000 6,785.50$ 250811 04/17/2025 LORRAINE MENDEZ MAR 2025-PREPARATION AND SUBMISSION OF HUD REPORTS 220-40-420-51101-14700 903.00$ 250811 04/17/2025 LORRAINE MENDEZ MAR 2025-PREPARATION AND SUBMISSION OF HUD REPORTS 221-40-420-51101-14705 462.00$ 250808 04/17/2025 KINGDOM CAUSES, INC. FEB 2024-OPERATIONAL COST-S. HOMES-LAHSA 270-60-691-53370-66024 64,116.64$ 250809 04/17/2025 LA CANADA DESIGN GROUP INC JAN&FEB 2025-CONSTRUCTION ADMIN SRVC-ZOCALO PARK 256-50-520-58100-55022 7,371.30$ 250809 04/17/2025 LA CANADA DESIGN GROUP INC MAR 2025-CONSTRUCTION ADMIN SRVC-ZOCALO PARK 256-50-520-58100-55022 2,206.40$ 250805 04/17/2025 J & S STRIPING CO INC RE-PAINT AND/OR INSTALL TRAFFIC MARKINGS 245-50-550-51100-15705 27,659.00$ 250806 04/17/2025 JOHN L HUNTER & ASSOCIATES INC JAN 2025-COMMERCIAL&INDUSTRIAL INSPECTIONS 249-50-510-51100-15400 13,630.00$ 250807 04/17/2025 JONATHAN MONTENEGRO PER DIEM-STREET GANGS TRAINING-4/25/2025 100-30-310-53200-00000 8.00$ 250802 04/17/2025 EWING IRRIGATION, INC. IRRIGATION SUPPLIES FOR LANDSCAPED AREAS 251-50-562-53100-00000 197.77$ 250803 04/17/2025 HOME DEPOT SPECIALIZED SPRAY PAINTS AND COLORED PAINTS 254-50-570-53100-14885 245.26$ 250804 04/17/2025 INTERSTATE BATTERIES BATTERIES FOR CITY VEHICLES & EQUIPMENT 402-50-590-53100-00000 448.88$ 250800 04/17/2025 EAST SAN GABRIEL VALLEY ASSISTANCE TO THE HOMELESS 220-40-420-53360-14830 533.71$ 250800 04/17/2025 EAST SAN GABRIEL VALLEY MAR 2025-ASSISTANCE TO THE HOMELESS 220-40-420-53360-14830 1,469.71$ 250801 04/17/2025 EHS INTERNATIONAL, INC. SAFETY CLASSES FOR PUBLIC WORKS DEPT.-4/2/2025 254-50-551-53200-15705 1,320.00$ 250797 04/17/2025 COMMERCE HOSE & INDUSTRIAL PRODUCTS MATERIAL&SUPPLIES-HOSES&CABLES FOR CNG STATION 402-50-590-53100-00000 134.82$ 250798 04/17/2025 CORRAL CONSTRUCTION & DEVELOPMENT INC. PYMT#4-CONSTRUCTION CONTRACT FOR MORGAN PARK 275-60-706-58100-55027 57,475.00$ 250799 04/17/2025 DAVID LAM RENTAL DEPOSIT REFUND-4/13/2025-SENIOR CENTER 501-60-000-22333-00000 150.00$ 250796 04/17/2025 CARLOS HERMOSILLO CRV/FA/AED SAFETY TRAINING FOR STAFF 03/19/25 100-60-630-53200-00000 190.00$ 250796 04/17/2025 CARLOS HERMOSILLO CRV/FA/AED SAFETY TRAINING FOR STAFF 03/19/25 100-60-680-53200-00000 190.00$ 250797 04/17/2025 COMMERCE HOSE & INDUSTRIAL PRODUCTS MATERIAL&SUPPLIES-HOSES&CABLES FOR CNG STATION 402-50-590-53100-00000 1,111.87$ 250796 04/17/2025 CARLOS HERMOSILLO CPR/FA/AED SAFETY TRAINING FOR STAFF 03/18/2025 100-60-680-53200-00000 95.00$ 250796 04/17/2025 CARLOS HERMOSILLO CPR/FA/AED SAFETY TRAINING FOR STAFF 03/18/2025 501-60-000-22328-00000 180.00$ 250796 04/17/2025 CARLOS HERMOSILLO CRV/FA/AED SAFETY TRAINING FOR STAFF 03/19/25 100-60-610-53200-00000 665.00$ 250796 04/17/2025 CARLOS HERMOSILLO CPR/FA/AED SAFETY TRAINING FOR STAFF 03/18/2025 100-60-630-53200-00000 95.00$ 250796 04/17/2025 CARLOS HERMOSILLO CPR/FA/AED SAFETY TRAINING FOR STAFF 03/18/2025 100-60-660-53200-00000 95.00$ 250796 04/17/2025 CARLOS HERMOSILLO CPR/FA/AED SAFETY TRAINING FOR STAFF 03/18/2025 100-60-670-53200-15100 190.00$ 250796 04/17/2025 CARLOS HERMOSILLO CRV/FA/AED SAFETY TRAINING FOR STAFF 03/15/25 100-60-680-53200-00000 95.00$ 250796 04/17/2025 CARLOS HERMOSILLO CRV/FA/AED SAFETY TRAINING FOR STAFF 03/15/25 501-60-000-22328-00000 955.00$ 250796 04/17/2025 CARLOS HERMOSILLO CPR/FA/AED SAFETY TRAINING FOR STAFF 03/18/2025 100-60-610-53200-00000 865.00$ 250796 04/17/2025 CARLOS HERMOSILLO CRV/FA/AED SAFETY TRAINING FOR STAFF 03/15/25 100-60-610-53200-00000 90.00$ 250796 04/17/2025 CARLOS HERMOSILLO CRV/FA/AED SAFETY TRAINING FOR STAFF 03/15/25 100-60-620-53200-00000 190.00$ 250796 04/17/2025 CARLOS HERMOSILLO CRV/FA/AED SAFETY TRAINING FOR STAFF 03/15/25 100-60-640-53200-00000 95.00$ 250793 04/17/2025 AT&T MAR 2025-MOBILE DATA COMPUTERS-ACT#082046 100-30-310-53403-00000 1,581.59$ 250794 04/17/2025 BASIC BACKFLOW TESTING OF BACKFLOW DEVICES THROUGHOUT BP 251-50-562-51101-00000 600.00$ 250795 04/17/2025 BILL WRIGHT'S PAINT SPECIALIZED SPRAY PAINTS AND COLORED PAINTS 254-50-570-53100-14885 285.99$ 250792 04/17/2025 ALL CITY MANAGEMENT SERVICES, INC CROSSING GUARD SERVICES-2/16-3/1/2025 100-30-390-51100-13200 15,055.56$ 250792 04/17/2025 ALL CITY MANAGEMENT SERVICES, INC CROSSING GUARD SERVICES-3/2-3/15/2025 100-30-390-51100-13200 16,728.40$ 250793 04/17/2025 AT&T JAN 2025-MOBILE DATA COMPUTERS-ACT#082046 100-30-310-53403-00000 3,163.18$ 250790 04/17/2025 ALEGANDRO BOLANOS REFUND-RENTAL CANCELLED FOR SENIOR CEN.-8/9-8/10 100-60-000-45601-00000 500.00$ 250791 04/17/2025 ALFREDO LEAL PER DIEM-CERTIFIED GANG ENFORCEMENT 4/25/2025 100-30-310-53200-00000 8.00$ 250792 04/17/2025 ALL CITY MANAGEMENT SERVICES, INC CROSSING GUARD SERVICES-3/16-3/29/2025 100-30-390-51100-13200 15,055.56$ 250788 04/10/2025 VIRGINIA OLVERA MUSICAL PERFORMANCE AT ZOCALO PARK 3/28/2025 110-60-685-51101-00000 600.00$ 250789 04/10/2025 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 94.02$ 250789 04/10/2025 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 94.01$ 250785 04/10/2025 VALLEY COUNTY WATER DIST WATER-MULTI-SPRINKLERS 2/18-3/20/25 251-50-560-53402-00000 9,231.81$ 250786 04/10/2025 VERIZON WIRELESS PHONE-870914792-00017-CITY CLERK 2/22-3/21/25 100-10-120-53403-00000 41.57$ 250787 04/10/2025 VERONICA ROONEY RENTAL DEPOSIT-WALNUT CREEK NATURE PARK 4/5/2025 501-60-000-22333-00000 150.00$ 250783 04/10/2025 USA ALARM SYSTEMS, INC. FIRE ALARM MONITORING SERVICE 4/1-4/30/2025 252-60-620-51101-00000 1,132.33$ 250784 04/10/2025 V & V MANUFACTURING BADGE REPAIR FOR POLICE OFFICER 3/18/2025 100-30-310-53371-00000 356.99$ 250785 04/10/2025 VALLEY COUNTY WATER DIST WATER-8010300-E. VILLA-14173 GARVEY 6/21-7/23/24 100-60-620-53402-55003 186.56$ 250783 04/10/2025 USA ALARM SYSTEMS, INC. FIRE ALARM MONITORING SERVICE 4/1-4/30/2025 100-60-620-51101-00000 973.34$ 250783 04/10/2025 USA ALARM SYSTEMS, INC. FIRE ALARM MONITORING SERVICE 4/1-4/30/2025 100-60-620-51101-15100 245.00$ 250782 04/10/2025 ULINE, INC. GLOVES FOR DEPARTMENT 100-30-370-53100-00000 677.87$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES FEB.2025 251-50-571-53100-13401 89.12$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES FEB.2025 245-50-562-53100-13401 57.96$ 250837 04/17/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 2/22-3/21/25 252-60-620-53403-00000 62.35$ 250838 04/17/2025 VERIZON WIRELESS PHONE-870914792-00001-PUBLIC WORKS 2/22-3/21/25 251-50-562-53403-00000 605.06$ 250838 04/17/2025 VERIZON WIRELESS PHONE-870914792-00001-PUBLIC WORKS 2/22-3/21/25 254-50-570-53403-14885 1,462.19$ 250837 04/17/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 2/22-3/21/25 100-60-640-53403-00000 121.15$ 250837 04/17/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 2/22-3/21/25 100-60-660-53403-00000 41.57$ 250837 04/17/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 2/22-3/21/25 100-60-680-53403-00000 79.58$ 250837 04/17/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 2/22-3/21/25 100-60-610-53403-00000 201.92$ 250837 04/17/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 2/22-3/21/25 100-60-620-53403-00000 62.36$ 250837 04/17/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 2/22-3/21/25 100-60-630-53403-00000 83.14$ 250835 04/17/2025 VALLEY COUNTY WATER DIST WATER-2898400-TRANS CTR-3875 BOGART 2/18-3/20/25 254-60-620-53402-15882 134.29$ 250835 04/17/2025 VALLEY COUNTY WATER DIST WATER-MULTI-TRANSIT CENTER 2/20-3/24/25 254-60-620-53402-15882 423.39$ 250836 04/17/2025 VERIZON WIRELESS PHONE-870914792-00003-RECREATION 2/22-3/21/25 100-60-650-53403-00000 287.43$ 250835 04/17/2025 VALLEY COUNTY WATER DIST WATER-MULTI-CITY BUILDINGS 2/20-3/24/25 100-60-620-53402-00000 452.70$ 250835 04/17/2025 VALLEY COUNTY WATER DIST WATER-MULTI-CITY PARKS 2/18-3/20/25 252-60-620-53402-00000 1,985.59$ 250835 04/17/2025 VALLEY COUNTY WATER DIST WATER-8011500-CITY PARK 14349 PACIFIC 2/20-3/24/25 252-60-620-53402-00000 54.49$ 250833 04/17/2025 TPX COMMUNICATIONS CO LOCAL, LONG DISTANCE TELEPHONE AND DATA 401-10-141-53403-11506 7,804.45$ 250834 04/17/2025 TRIPEPI,SMITH AND ASSOCIATES, INC PROGRAMMING AND COMMUNITY OUTREACH FOR MAR 2025 270-50-520-58100-15093 818.75$ 250835 04/17/2025 VALLEY COUNTY WATER DIST WATER-MULTI-CITY BUILDINGS 2/18-3/20/25 100-60-620-53402-00000 4,020.50$ 250830 04/17/2025 SOUTHERN CALIFORNIA GAS CO GAS-69161-E. VILLA-13167 GARVEY 2/27-3/28/25 100-60-620-53400-55003 134.88$ 250831 04/17/2025 SUNBELT RENTALS MISCELLANEOUS RENTAL EQUIPMENT 4/1-4/2/2025 240-50-551-53391-15705 1,277.16$ 250832 04/17/2025 T-MOBILE PHONE-37340-GPS TRACKING 2/21-3/20/25 402-50-590-51101-00000 1,236.50$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-CB-PUBLIC BLDGS-14403 PACIFIC 2/6-3/24/25 100-60-620-53401-00000 20,421.63$ 250830 04/17/2025 SOUTHERN CALIFORNIA GAS CO GAS-69003-CITY BLDG-13135 GARVEY 2/27-3/28/25 100-60-620-53400-00000 236.39$ 250830 04/17/2025 SOUTHERN CALIFORNIA GAS CO GAS-MULTI-CITY BUILDINGS 2/28-3/31/25 100-60-620-53400-00000 5,587.17$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON 3/10-4/7/2025 251-50-560-53401-00000 96.10$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-ST LIGHT-14006 1/2 LOS ANGELES 3/11-4/8/25 251-50-560-53401-00000 76.82$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-CB-PUBLIC BLDGS-14403 PACIFIC 12/6-3/26/25 100-60-620-53401-00000 20,375.19$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-TRANSIT CENTER-3821 BOGART A 3/11-4/8/25 254-60-620-53401-15882 4,412.28$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-CNG-14747 1/2 RAMONA 3/11-4/8/25 100-60-620-53401-00000 5,456.46$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-CB-AUDITORIUM-14403 PACIFIC 3/10-4/7/25 100-60-620-53401-00000 1,742.91$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-ST LIGHT-14352 1/2 OHIO 3/10-4/7/25 251-50-560-53401-00000 74.62$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-ST LIGHT-13911 1/2 LOS ANGELES 3/11-4/8/25 251-50-560-53401-00000 72.68$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-TRAF SIGNALS-14104 LOS ANGELES 3/11-4/8/25 251-50-560-53401-00000 88.04$ 250828 04/17/2025 SECURITAS TECHNOLOGY CORPORATION PARKING STRUCTURE SURVEILLANCE SERVICE 4/1-6/30/25 245-60-620-53371-00000 2,126.84$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-ST LIGHT-14403 PACIFIC 3/1-3/31/25 251-50-530-53401-00000 12,561.46$ 250829 04/17/2025 SOUTHERN CALIFORNIA EDISON ELEC-ST LIGHT-14403 PACIFIC 3/1-3/31/25 251-50-530-53401-00000 36,858.76$ 250827 04/17/2025 SAN GABRIEL VALLEY WATER COMPANY WATER-100636-PATRITTI/BESS 2/27-3/28/2025 252-60-620-53402-00000 726.86$ 250827 04/17/2025 SAN GABRIEL VALLEY WATER COMPANY WATER-121578-S. HOMES-13165 GARVEY 3/5-4/7/2025 100-60-620-53402-55003 267.20$ 250827 04/17/2025 SAN GABRIEL VALLEY WATER COMPANY WATER-MULTI-SPRINKLERS 3/5-4/7/25 251-50-560-53402-00000 1,563.97$ 250827 04/17/2025 SAN GABRIEL VALLEY WATER COMPANY WATER-MULTI-CITY BLDGS 3/5-4/7/25 100-60-620-53402-00000 1,048.17$ 250827 04/17/2025 SAN GABRIEL VALLEY WATER COMPANY WATER-117217-1209 VINELAND-CITY PARKS 3/4-4/3/25 252-60-620-53402-00000 354.12$ 250827 04/17/2025 SAN GABRIEL VALLEY WATER COMPANY WATER-MULTI-CITY PARKS 3/5-4/7/25 252-60-620-53402-00000 1,526.96$ 250824 04/17/2025 RAILPROS, INC. CONSTRUCTION MANAGEMENT & INSPECTION 3/1-3/31/2025 255-50-520-58100-15550 24,763.54$ 250825 04/17/2025 RIGHT OF WAY INC REPLACEMENT ROADWAY SIGNS 3/6/2025 254-50-550-53100-15622 5,251.62$ 250826 04/17/2025 RKA CONSULTING GROUP ENGINEERING SERVICES 3/1-3/31/2025 100-50-510-51100-00000 1,750.00$ 250821 04/17/2025 PRIME POWER EQUIPMENT INC MATERIALS & SUPPLIES FOR STREET LANDSCAPE CREW 245-50-560-53100-15536 49.35$ 250822 04/17/2025 PROFORCE LAW ENFORCEMENT 50/EA BUSCH PROTECTIVE HELMENT/MID-CUT/BLACK 100-30-340-53100-00000 44,789.46$ 250823 04/17/2025 PYRO SPECTACULARS INC. INITIAL PRODUCTION FEE FOR PYROTECHNIC 100-00-000-13000-16145 11,500.00$ 250820 04/17/2025 PREMIERE FUELING SERVICES INC STATE TESTING REQUIREMENTS, INSPECTIONS 3/19/2025 402-50-590-51101-00000 975.00$ 250820 04/17/2025 PREMIERE FUELING SERVICES INC STATE TESTING REQUIREMENTS, INSPECTIONS 3/24/2025 402-50-590-51101-00000 150.00$ 250820 04/17/2025 PREMIERE FUELING SERVICES INC STATE TESTING REQUIREMENTS, INSPECTIONS 3/24/2025 402-50-591-51101-00000 150.00$ 250818 04/17/2025 PACIFIC PRODUCTS & SERVICES LLC MATERIALS & SUPPLIES FOR TRAFFIC SIGNS 245-50-550-53100-15622 897.77$ 250818 04/17/2025 PACIFIC PRODUCTS & SERVICES LLC MATERIALS & SUPPLIES FOR TRAFFIC SIGNS 245-50-550-53100-15622 318.94$ 250819 04/17/2025 PEDROZA CONCRETE SYSTEMS, INC LANDSCAPE RENOVATION TO THE FRONT ENTRANCE 3/18/25 234-50-520-58100-55042 5,940.00$ 250816 04/17/2025 MIDWEST MOTOR SUPPLY MISCELLANEOUS SUPPLIES FOR FLEET SERVICES 402-50-591-53100-00000 186.55$ 250817 04/17/2025 MOON VALLEY NURSERY OF CA, INC LARGE TREES FOR CIP24-031-55402 MORGAN PARK 234-50-520-58100-55042 5,769.00$ 250815 04/17/2025 MERRIMAC ENERGY GROUP REGULAR UNLEADED GASOLINE 8202 GALLONS, 402-50-591-53110-16140 11,871.90$ 250816 04/17/2025 MIDWEST MOTOR SUPPLY MISCELLANEOUS SUPPLIES FOR FLEET SERVICES 402-50-590-53100-00000 186.54$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250859 04/17/2025 DISCOUNT SCHOOL SUPPLY ARTS&CRAFTS SUPPLIES FOR BASIC 100-60-650-53100-00000 1,535.33$ 250860 04/17/2025 ELVIS SHOW SOCAL PA DIAGNOSIS&TRAINING AT ZOCALO PARK 110-60-685-51101-00000 300.00$ 250861 04/17/2025 FEDEX OFFICE FLYERS FOR BLACK HISTORY MONTH CELEBRATION 100-60-610-53100-16165 307.51$ 250857 04/17/2025 CONCENTRA HEALTH SERVICES, INC PHYSICAL EXAM FOR EMPLOYEES-03/19/2025 100-10-150-51101-11122 119.00$ 250857 04/17/2025 CONCENTRA HEALTH SERVICES, INC PHYSICAL EXAM FOR EMPLOYEES-03/19/2025 100-10-150-51101-11122 119.00$ 250858 04/17/2025 CORODATA RECORDS MANAGEMENT, INC. STORAGE OF FILES FOR 3/1-3/31/2025 100-10-120-51101-11431 64.61$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY ZOLL PLUS AED SEMI-AUTOMATIC AGREEMENT 403-10-160-51101-11350 101.43$ 250856 04/17/2025 CLARISSA I. ZAMORA MAR 2025-BALLET FOLKORICO INSTRUCTOR 501-60-000-22328-00000 724.50$ 250857 04/17/2025 CONCENTRA HEALTH SERVICES, INC PHYSICAL EXAM FOR EMPLOYEES-03/21/2025 100-10-150-51101-11122 99.00$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY ZOLL PLUS AUTO AGREEMENT 403-10-160-51101-11350 912.87$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY ZOLL PLUS AUTO AGREEMENT 403-10-160-51101-11350 912.87$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY ZOLL PLUS AUTO AGREEMENT 403-10-160-51101-11350 304.29$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR REC. DEPARTMENT ARC 110-60-685-53100-00000 49.27$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY SUPPLIES FOR FIRST AID KIT IN CITY YARD&MECH SHOP 254-50-550-53100-15705 190.96$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY SUPPLIES FOR FIRST AID KIT IN CITY YARD&MECH SHOP 402-50-590-53100-00000 190.97$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR REC. DEPARTMENT 100-60-610-53100-00000 98.60$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR REC. DEPARTMENT SR. CENTER 100-60-630-53100-00000 35.75$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR REC. DEPARTMENT FAMILY CENT 100-60-640-53100-00000 68.21$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR REC. DEPARTMENT FAMILY SRV. 100-60-640-53100-00000 46.90$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR REC. DEPARTMENT TEEN CENTER 100-60-660-53100-00000 44.84$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR REC. DEPARTMENT ARC 110-60-685-53100-00000 66.68$ 250854 04/17/2025 CHICAS GRAPHICS AND DESIGN TROPHIES FOR YOUTH FLAG FOOTBALL PARTICIPANTS 501-60-000-22326-00000 449.82$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR REC. DEPARTMENT 100-60-610-53100-00000 160.82$ 250855 04/17/2025 CINTAS FIRST AID & SAFETY FIRST AID SUPPLIES FOR REC. DEPARTMENT SR CENTER 100-60-630-53100-00000 26.61$ 250851 04/17/2025 AUTOMATION SOLUTIONS, INC. ELECTRICAL REPAIRS AT CITY HALL-4/4/2025 100-60-620-53371-00000 1,536.00$ 250852 04/17/2025 BALDWIN PARK FLOWERS & GIFTS BIG RED BOW FOR MEXICAN CONSOLUTE PRESS CONFERENCE 501-60-000-22328-00000 45.00$ 250853 04/17/2025 CARLA GUTIERREZ BALLOON INSTALLATION FEE FOR 2025 YOUTH SOCCER 501-60-000-22326-00000 300.00$ 250849 04/17/2025 ANASTASIA MARKOVA SPRING FEST 2025 CHARACTERS 100-60-610-51101-16152 1,600.00$ 250850 04/17/2025 APRIL M. ROJO REIM-PAPER BAGS FOR SPRING FEST & EGG HUNT 501-60-000-22328-00000 259.68$ 250850 04/17/2025 APRIL M. ROJO REIM-BASKETS FOR SPRING FEST & EGG HUNT 100-60-610-53100-16152 618.81$ 250847 04/17/2025 AIR EFFICIENCY SERVICES ANDREW DIAZ MAINTENANCE&REPAIRS TO ICE MACHINE 100-60-620-53371-00000 1,822.56$ 250847 04/17/2025 AIR EFFICIENCY SERVICES ANDREW DIAZ MAINTENANCE&REPAIRS TO ICE MACHINE 100-60-620-53371-00000 975.00$ 250848 04/17/2025 ALAN VELASCO TWO REGISTRAION TICKETS TO CA GOLDEN GOVES BOXING 100-60-610-53350-16130 41.00$ 250845 04/17/2025 SOUTHLAND TRANSIT, INC. FAREBOX REVENUE BP FEB.2025 244-50-000-42151-00000 (2,640.50)$ 250845 04/17/2025 SOUTHLAND TRANSIT, INC. FAREBOX REVENUE BP FEB.2025 244-50-000-42151-00000 (195.00)$ 250846 04/17/2025 ABSOLUTE SECURITY INTERNATIONAL CORP JAN 2025-SECURITY SRVC AT SENIOR CENTER&ARC 501-60-000-22328-00000 957.00$ 250845 04/17/2025 SOUTHLAND TRANSIT, INC. FIXED ROUTE SERVICES BP FEB. 2025 244-50-580-51100-15525 107,685.96$ 250845 04/17/2025 SOUTHLAND TRANSIT, INC. FUEL COST BP FEB. 2025 244-50-580-51100-15525 3,412.15$ 250845 04/17/2025 SOUTHLAND TRANSIT, INC. DIAL-A-RIDE SERVICES BP FEB.2025 244-50-580-51100-15520 26,423.95$ 250843 04/17/2025 WEST COAST ARBORISTS, INC CITY WIDE TREE MAINTENANCE CONTRACT 2/16-2/28/2025 251-50-561-51100-00000 1,329.00$ 250843 04/17/2025 WEST COAST ARBORISTS, INC CITY WIDE TREE MAINTENANCE CONTRACT 3/16-3/31/2025 251-50-561-51100-00000 2,584.30$ 250844 04/17/2025 YUNEX LLC CITY TRAFFIC SIGNALS AND STREET LIGHTS MARCH 2025 240-50-530-51100-00000 2,290.56$ 250841 04/17/2025 WASTE MANAGEMENT COLLECTION AND RECYCLING, INC CNG FUEL FOR CITY AND POLICE VEHICLES 3/20/2025 402-50-590-53110-16140 337.38$ 250842 04/17/2025 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 100-60-620-53100-00000 2,169.54$ 250842 04/17/2025 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 252-60-620-53100-00000 2,169.53$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES MARCH 2025 251-50-571-53100-13401 276.05$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES MARCH 2025 251-50-571-53100-13401 96.20$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES MARCH 2025 251-50-571-53100-13401 280.31$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES MARCH 2025 251-50-571-53100-13401 96.20$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES MARCH 2025 251-50-571-53100-13401 309.05$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES MARCH 2025 251-50-571-53100-13401 96.20$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES FEB.2025 251-50-571-53100-13401 284.13$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES MARCH 2025 251-50-571-53100-13401 99.20$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES MARCH 2025 251-50-571-53100-13401 371.51$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES FEB.2025 251-50-571-53100-13401 96.20$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES FEB.2025 251-50-571-53100-13401 314.13$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES FEB.2025 251-50-571-53100-13401 112.20$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES FEB.2025 251-50-571-53100-13401 301.42$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES FEB.2025 251-50-571-53100-13401 475.61$ 250839 04/17/2025 VESTIS GROUP, INC UNIFORMS FOR SEIU EMPLOYEES FEB.2025 251-50-571-53100-13401 288.09$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250893 04/17/2025 O'REILLY AUTO PARTS MATERIALS & SUPPLIES FOR PD 402-50-591-53100-00000 12.23$ 250893 04/17/2025 O'REILLY AUTO PARTS MATERIALS & SUPPLIES FOR PD 402-50-591-53100-00000 20.88$ 250893 04/17/2025 O'REILLY AUTO PARTS MATERIALS & SUPPLIES FOR PD 402-50-591-53100-00000 42.74$ 250893 04/17/2025 O'REILLY AUTO PARTS MATERIALS & SUPPLIES FOR PD 402-50-591-53100-00000 135.80$ 250893 04/17/2025 O'REILLY AUTO PARTS MATERIALS & SUPPLIES FOR THE FLEET DEPT. 402-50-591-53100-00000 (12.50)$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC CITY WIDE PAPER 401-10-141-53100-11504 1,855.94$ 250892 04/17/2025 OMEGA POLYGRAPH, LLC POLYGRAPH EXAMS FOR PD APPLICANTS-1/3-3/11/2025 100-30-310-51100-00000 2,400.00$ 250893 04/17/2025 O'REILLY AUTO PARTS MATERIALS & SUPPLIES FOR FLEET 402-50-590-53100-00000 42.73$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-370-53100-00000 95.99$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-370-53100-00000 44.95$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-370-53100-00000 16.09$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-370-53100-00000 729.13$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-370-53100-00000 69.05$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR PD 100-30-370-53100-00000 82.47$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR ENGINEERING DIVISION 240-50-510-53100-00000 54.46$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR ENGINEERING DIVISION 240-50-510-53100-00000 27.72$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR ENGINEERING DIVISION 240-50-510-53100-00000 47.50$ 250889 04/17/2025 NICHOLS LUMBER & HARDWARE MATERIALS & SUPPLIES FOR TREE MAINTENANCE 240-50-561-53100-00000 91.95$ 250890 04/17/2025 OCEAN BLUE ENVIRONMENTAL SERVICES, INC WASTE PICK UP AT 13135 GARVEY CITY YARD 7/2/2024 258-50-551-51101-00000 2,100.00$ 250891 04/17/2025 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR ENGINEERING DIVISION 240-50-510-53100-00000 35.38$ 250886 04/17/2025 LUIS FREGOSO INSTRUCTOR-MARIACHI CLASSES-2/10-3/17/2025 501-60-000-22328-00000 202.50$ 250887 04/17/2025 MICHAEL KELLY MAR 2025-JAIL INMATE PHONE SYSTEM SUPPLY&MAINTENAN 100-30-370-53403-00000 200.00$ 250888 04/17/2025 NATURE'S TREE SERVICE TRIMMED TREES AT METROLINK STATION-3/29/2025 245-50-561-51101-15536 4,950.00$ 250883 04/17/2025 LOS ANGELES COUNTY PUBLIC WORKS ADMINISTR SUPPORT&ENVIRONEMNTAL DETERMINATION 245-50-520-58100-15093 1,128.69$ 250884 04/17/2025 LOS ANGELES COUNTY SHERIFFS DEPARTMENT LEVYING OFFICER FILE#3302501060096-W.GARNISHMENT 100-00-000-21225-00000 142.40$ 250885 04/17/2025 LOS ANGELES COUNTY SHERIFFS DEPARTMENT HELICOPTER SRVC 12/1-12/31/2024 100-30-340-51100-00000 382.48$ 250880 04/17/2025 LEWIS ENGRAVING INC FIRE ALARM SIGN FOR CITY HALL 100-60-620-53100-00000 58.57$ 250881 04/17/2025 LILAS INC CLEANING SRVC FOR JAIL 4/5/2025 100-30-370-51101-00000 70.00$ 250882 04/17/2025 LONG TANG REIM-2 WIRELESS BLUETOOTH EARBUDS 100-40-450-53100-00000 198.42$ 250877 04/17/2025 JIMMY WONG REIM-CLOTH FABRIC BACKDROP FOR THE REC. TEAM 501-60-000-22328-00000 224.80$ 250878 04/17/2025 KIEFER AQUATICS THE LIFEGUARD STORE MATERIALS&SUPPLIES FOR AQUATIC CENTER 100-60-610-53100-00000 4,139.51$ 250879 04/17/2025 LAW OFFICES OF JULIA SYLVA, A LAW CORPORATION MAR 2025-COMMERCIAL CANNABIS MATTER 237-40-131-51102-14070 164.80$ 250874 04/17/2025 INTERACTIVE DATA, LLC ONLINE SEARCH SITE FOR DB CASES 100-30-360-51100-00000 79.00$ 250875 04/17/2025 INTERNATIONAL INSTITUTE OF MUNICIPAL CLERKS CITY CLERK MEMBERSHIP DUES-ID 42238 100-10-120-53330-00000 235.00$ 250876 04/17/2025 JAMES IZZO REIM-FOOD FOR BOOTCAMP 20 STUDENTS-4/12/2025 220-30-340-53360-14880 93.00$ 250872 04/17/2025 HOME DEPOT A#23247-SUPPLIES FOR STREET LANDSCAPE 245-50-560-53100-00000 57.82$ 250872 04/17/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 22.54$ 250873 04/17/2025 HONEYCOTT., INC REMOVAL OF HONEYBEES FROM A TREE-S.HOMES 100-60-620-53371-55003 150.00$ 250872 04/17/2025 HOME DEPOT A#23247-SUPPLIES FOR TRAFFIC MAINTENANCE 240-50-550-53100-15705 13.14$ 250872 04/17/2025 HOME DEPOT A#23247-SUPPLIES FOR STREET LANDSCAPE 245-50-560-53100-00000 323.04$ 250872 04/17/2025 HOME DEPOT A#23247-SUPPLIES FOR STREET LANDSCAPE 245-50-560-53100-00000 199.80$ 250872 04/17/2025 HOME DEPOT A#23247-SUPPLIES FOR TREE DIVISION 240-50-561-53100-00000 264.68$ 250872 04/17/2025 HOME DEPOT A#23247-SUPPLIES FOR STREET MAINTENANCE 240-50-551-53100-15705 (157.17)$ 250872 04/17/2025 HOME DEPOT A#23247-SUPPLIES FOR STREET MAINTENANCE 240-50-551-53100-15705 111.83$ 250871 04/17/2025 HLR MEDIA, LLC PUBLIC NOTICE FOR PLANNING-3/13/2025 100-40-440-53330-00000 699.96$ 250871 04/17/2025 HLR MEDIA, LLC PUBLIC NOTICE FOR PLANNING-3/13/2025 501-40-000-22335-00000 256.00$ 250871 04/17/2025 HLR MEDIA, LLC PUBLIC NOTICE FOR PLANNING-3/27/2025 501-40-000-22335-00000 652.00$ 250868 04/17/2025 GRAINGER, INC. MATERIAL AND SUPPLIES-STOCK FOR FLEET AND POLICE 402-50-591-53100-00000 212.12$ 250869 04/17/2025 GREG RUVOLO MAINTENANCE & RPAIRS-LOCK BOX ON STORAGE 4/3/2025 254-50-551-53371-15705 750.00$ 250870 04/17/2025 HELEN HERNANDEZ MATERIALS&SUPPLIERS FOR ZOCALO PARK 110-60-685-53100-00000 131.88$ 250868 04/17/2025 GRAINGER, INC. MATERIAL AND SUPPLIES-LASER LABEL 246-50-540-53100-15005 71.34$ 250868 04/17/2025 GRAINGER, INC. MATERIAL AND SUPPLIES-CARD STOCK PAPER 246-50-540-53100-15005 86.66$ 250868 04/17/2025 GRAINGER, INC. MATERIAL AND SUPPLIES-STOCK FOR FLEET AND POLICE 402-50-590-53100-00000 212.11$ 250866 04/17/2025 FRANCISCO J. CARVENTE DEPOSIT-MUSIC ENTER. AT ZOCALO PARK-5/2/2025 110-60-685-51101-00000 200.00$ 250867 04/17/2025 FRONTIER COMMUNICATIONS ACT#0317985-PD PHONE-3/28-4/27/2025 100-30-340-53403-00000 202.50$ 250868 04/17/2025 GRAINGER, INC. MATERIAL AND SUPPLIES-DRY ERASE BOARD 246-50-540-53100-15005 273.79$ 250864 04/17/2025 FEDEX OFFICE POSTER CHECKS&FLYERS FOR HOLIDAY PARADE 210-60-610-53100-16148 150.31$ 250865 04/17/2025 FRANCHISE TAX BOARD PAYROLL DEDUCTION-ACT#31222 100-00-000-21225-00000 33.96$ 250862 04/17/2025 FEDEX OFFICE POSTER CHECKS&FLYERS FOR HOLIDAY PARADE 210-60-610-53100-16148 1,163.14$ 250863 04/17/2025 FEDEX OFFICE POSTER CHECKS&FLYERS FOR HOLIDAY PARADE 210-60-610-53100-16148 150.31$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/19/2025 100-60-620-53371-00000 158.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/24/2025 100-60-620-53371-00000 100.00$ 250913 04/17/2025 THE HAPPY KEY MATERIALS & SUPPLIES -KEYS FOR UNIT#5099 402-50-590-53100-00000 30.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/13/2025 100-60-620-53371-00000 81.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/13/2025 100-60-620-53371-00000 158.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/13/2025 100-60-620-53371-00000 60.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/6/2025 100-60-620-53371-00000 59.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/13/2025 100-60-620-53371-00000 96.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/13/2025 100-60-620-53371-00000 69.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/4/2025 100-60-620-53371-00000 83.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/6/2025 100-60-620-53371-00000 169.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/6/2025 100-60-620-53371-00000 118.10$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/4/2025 100-60-620-53371-00000 157.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/4/2025 100-60-620-53371-00000 158.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/4/2025 100-60-620-53371-00000 219.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 2/5/2025 100-60-620-53371-00000 151.20$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/4/2025 100-60-620-53371-00000 141.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/4/2025 100-60-620-53371-00000 65.42$ 250910 04/17/2025 SYN-TECH SYSTEMS INC FUELMASTER SUPER MAINTENANCE 4/4/2025-4/3/2026 402-50-590-51101-00000 1,325.00$ 250910 04/17/2025 SYN-TECH SYSTEMS INC FUELMASTER SUPER MAINTENANCE 4/4/2025-4/3/2026 402-50-591-51101-00000 1,325.00$ 250911 04/17/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 2/28/2025 100-60-620-53371-00000 158.00$ 250908 04/17/2025 SUNBELT RENTALS MAINTENANCE & SUPPLIES-REFILL PROPANE TANKS 240-50-551-53391-15705 126.80$ 250909 04/17/2025 SWRCB ANNUAL PERMIT:WASTE-ZOCALO& CIVIC 4/1/25-3/31/26 249-50-510-51100-15400 673.00$ 250909 04/17/2025 SWRCB ANNUAL PERMIT:WASTE-BARNES PARK 4/1/25-3/31/26 249-50-510-51100-15400 781.00$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 100-60-650-53100-00000 119.65$ 250906 04/17/2025 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION ROUTINE MAINTENANCE SINGALS, LIGHTING OCT-DEC 2024 251-50-530-51100-00000 5,171.16$ 250907 04/17/2025 STERICYCLE, INC. COLLECTION OF BIOHAZARD MATERIALS 4/1-4/30/2025 100-30-360-53100-00000 85.83$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 501-60-000-22328-00000 256.22$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 501-60-000-22328-00000 69.34$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 100-60-610-53100-16152 45.63$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 501-60-000-22328-00000 27.54$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 501-60-000-22328-00000 35.36$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 501-60-000-22328-00000 223.85$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 100-60-610-53100-17505 87.10$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 100-60-610-53100-17505 148.71$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 501-60-000-22328-00000 14.65$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 501-60-000-22327-00000 128.95$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 501-60-000-22328-16146 788.49$ 250905 04/17/2025 STAPLES OFFICE SUPPLIES-RECREATION FACILITIES & PROGRAMS 501-60-000-22328-00000 88.60$ 250902 04/17/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 501-60-000-22327-00000 226.96$ 250903 04/17/2025 SOUTHEAST CONSTRUCTION PRODUCTS, INC MATERIALS & SUPPLIES FOR STREET MAINTENANCE CREW 240-50-551-53100-15705 535.76$ 250904 04/17/2025 ST. GEORGE'S MEDICAL CLINIC ATTEND FBI ACADEMY 2/12/2025 & 3/18/2025 100-30-310-53200-00000 1,410.00$ 250902 04/17/2025 SMART & FINAL MATERIAL&SUPPLIES FOR EGG PLUNGE AND REC. OUTREACH 501-60-000-22328-00000 226.18$ 250902 04/17/2025 SMART & FINAL MATERIALS &SUPPLIES FOR THE TEEN CENTER 100-60-660-53100-00000 215.12$ 250902 04/17/2025 SMART & FINAL MATERIAL&SUPPLIES FOR EGG PLUNGE&REC. OUTREACH 501-60-000-22328-00000 68.44$ 250900 04/17/2025 SECURITAS TECHNOLOGY CORPORATION REPAIRS MADE TO VANDALIZED CAMERAS 3/26/25 100-60-620-53371-00000 285.00$ 250901 04/17/2025 SERVICE FIRST CONTRACTORS MAINTENANCE FOR SPLASH PAD IN MORGAN PARK 4/2/25 100-60-620-53371-00000 2,379.40$ 250902 04/17/2025 SMART & FINAL MATERIAL AND SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 181.76$ 250897 04/17/2025 QUALITY CONSERVATION SERVICES PERMIT REFUND: 13234 WACO ST-BLDG 0125-5076 100-40-000-43400-00000 101.60$ 250898 04/17/2025 RAQUEL M. CERVANTES CASE# RID 1202591- NOE CERVANTES 100-00-000-21225-00000 115.39$ 250899 04/17/2025 ROSANNA MEJIA CONTRACT SVCS HAWAIIAN DANCE CLASS 2//10-3/24/25 501-60-000-22328-00000 218.40$ 250895 04/17/2025 PRIME POWER EQUIPMENT INC MINOR EQUIPMENT -CHAINSAW 7 HANDLE SAW 254-50-550-53390-15705 1,927.17$ 250895 04/17/2025 PRIME POWER EQUIPMENT INC MAERIALS & SUPPLIES FOR STREET MAINTENANCE 240-50-551-53100-00000 28.44$ 250896 04/17/2025 PUENTE HILLS FORD LLC MATERIAL & SUPPLIES UNIT 5023 402-50-590-53100-00000 3,300.23$ 250894 04/17/2025 PEDROZA CONCRETE SYSTEMS, INC REMOVE & REPLACE CURB & GUTTER 13525 TRACY 3/11/25 245-50-551-51101-15705 4,650.00$ 250894 04/17/2025 PEDROZA CONCRETE SYSTEMS, INC REMOVE & PLACE ADA PANEL BOGART AVE. 3/24/2025 245-50-551-51101-15510 1,000.00$ 250894 04/17/2025 PEDROZA CONCRETE SYSTEMS, INC REMOVE & PLACE ADA PANEL BOGART AVE. 3/24/2025 251-50-551-51101-15510 682.00$ 250893 04/17/2025 O'REILLY AUTO PARTS MATERIALS & SUPPLIES FOR FLEET & PD 402-50-590-53100-00000 10.44$ 250893 04/17/2025 O'REILLY AUTO PARTS MATERIALS & SUPPLIES FOR FLEET & PD 402-50-591-53100-00000 10.44$ 250893 04/17/2025 O'REILLY AUTO PARTS RETURN ORIGINAL INVOICE :3052-154394, 3/17/2025 402-50-590-53100-00000 (11.05)$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250928 04/23/2025 ENTERPRISE FM TRUST APR 2025-EQUIPMENT LEASING 254-50-590-58140-15727 1,465.70$ 250928 04/23/2025 ENTERPRISE FM TRUST APR 2025-EQUIPMENT LEASING 402-50-590-58140-15727 1,167.14$ 250928 04/23/2025 ENTERPRISE FM TRUST APR 2024 FLEET LEASING PROGRAM 275-50-765-58140-53001 10,107.77$ 250928 04/23/2025 ENTERPRISE FM TRUST APR 2025 FLEET LEASING PROGRAM 402-50-591-58140-15727 4,531.96$ 250928 04/23/2025 ENTERPRISE FM TRUST APR 2025-EQUIPMENT LEASING 246-50-590-58140-15727 1,193.12$ 250928 04/23/2025 ENTERPRISE FM TRUST APR 2025-EQUIPMENT LEASING (10 PD VEHICLES) 110-50-591-58140-15727 14,712.11$ 250928 04/23/2025 ENTERPRISE FM TRUST APR 2025 FLEET LEASING PROGRAM 231-50-590-58140-15727 7,697.93$ 250928 04/23/2025 ENTERPRISE FM TRUST APR 2025 FLEET LEASING PROGRAM 246-50-590-58140-15727 4,103.67$ 250928 04/23/2025 ENTERPRISE FM TRUST APR 2025-CODE ENHANCEMENT VEHICLE-2020 FORD F-15 220-40-460-58140-14715 409.15$ 250928 04/23/2025 ENTERPRISE FM TRUST APR 2025-EQUIPMENT LEASING-DODGE CHARGER 27HSKW 402-50-591-58140-15727 1,076.78$ 250928 04/23/2025 ENTERPRISE FM TRUST AFTERMARKET EQUIPMENT 110-50-591-58110-59003 235,586.19$ 250928 04/23/2025 ENTERPRISE FM TRUST AFTERMARKET EQUIPMENT-FORD F-250 246-50-590-58140-15727 14,831.45$ 250928 04/23/2025 ENTERPRISE FM TRUST MAR 2025-EQUIPMENT LEASING 254-50-590-58140-15727 1,465.71$ 250928 04/23/2025 ENTERPRISE FM TRUST MAR 2025-EQUIPMENT LEASING 402-50-590-58140-15727 1,224.60$ 250928 04/23/2025 ENTERPRISE FM TRUST MAR 2025 FLEET LEASING PROGRAM 246-50-590-58140-15727 4,102.62$ 250928 04/23/2025 ENTERPRISE FM TRUST MAR 2025 FLEET LEASING PROGRAM 275-50-765-58140-53001 10,091.11$ 250928 04/23/2025 ENTERPRISE FM TRUST MAR 2025 FLEET LEASING PROGRAM 402-50-591-58140-15727 3,045.00$ 250928 04/23/2025 ENTERPRISE FM TRUST AFTERMARKET EQUIPMENT 110-50-591-58110-59003 28,414.48$ 250928 04/23/2025 ENTERPRISE FM TRUST MAR 2025-EQUIPMENT LEASING (10 PD VEHICLES) 110-50-591-58140-15727 6,974.78$ 250928 04/23/2025 ENTERPRISE FM TRUST MAR 2025 FLEET LEASING PROGRAM 231-50-590-58140-15727 7,691.64$ 250928 04/23/2025 ENTERPRISE FM TRUST FEB 2025-EQUIPMENT LEASING 402-50-590-58140-15727 1,647.30$ 250928 04/23/2025 ENTERPRISE FM TRUST MAR 2025-CODE ENHANCEMENT VEHICLE-2020 FORD F-15 220-40-460-58140-14715 457.14$ 250928 04/23/2025 ENTERPRISE FM TRUST MAR 2025-EQUIP.LEASING-DODGE CHARGER 27HSKW 402-50-591-58140-15727 1,083.10$ 250928 04/23/2025 ENTERPRISE FM TRUST FEB 2025 FLEET LEASING PROGRAM 402-50-591-58140-15727 4,537.60$ 250928 04/23/2025 ENTERPRISE FM TRUST FEB 2025-EQUIPMENT LEASING 254-50-590-58140-15727 1,474.46$ 250928 04/23/2025 ENTERPRISE FM TRUST AFTERMARKET EQUIPMENT-FORD F-250 402-50-590-58110-59003 15,231.73$ 250928 04/23/2025 ENTERPRISE FM TRUST FEB 2025 FLEET LEASING PROGRAM 231-50-590-58140-15727 9,245.68$ 250928 04/23/2025 ENTERPRISE FM TRUST FEB 2025 FLEET LEASING PROGRAM 246-50-590-58140-15727 4,102.62$ 250928 04/23/2025 ENTERPRISE FM TRUST FEB 2025 FLEET LEASING PROGRAM 275-50-765-58140-53001 10,085.06$ 250928 04/23/2025 ENTERPRISE FM TRUST FEB 2025-EQUIP. LEASING-DODGE CHARGER 27HSKW 402-50-591-58140-15727 2,183.36$ 250928 04/23/2025 ENTERPRISE FM TRUST AFTERMAKET EQUIPMENT 110-50-591-58110-59003 34,086.09$ 250928 04/23/2025 ENTERPRISE FM TRUST FEB 2025-EQUIPMENT LEASING (10 PD VEHICLES) 110-50-591-58140-15727 6,300.70$ 250927 04/17/2025 WINNER PARTY INC. MATERIALS & SUPPLIES FOR EGG PLUNGE EVENT 4/11/25 501-60-000-22328-00000 76.26$ 250928 04/23/2025 ENTERPRISE FM TRUST FEB 2025-CODE ENHANCEMENT VEHICLE-2020 FORD F-15 220-40-460-58140-14715 457.14$ 250928 04/23/2025 ENTERPRISE FM TRUST AFTERMARKET EQUIPMENT-DOGE CHARGER 27HSKW 402-50-591-58110-59003 13,382.55$ 250924 04/17/2025 WEST COAST ARBORISTS, INC WALNUT CREEK-162 TREE INSPECTION 251-50-561-51100-00000 1,551.00$ 250925 04/17/2025 WEX BANK FUEL CARDS FOR CITY VEHICLES 402-50-590-53110-16140 34.00$ 250926 04/17/2025 WILLDAN FINANCIAL SERVICES FOR PROFESIONAL SERVICES THROUGH 4/4/2025 100-25-299-51100-00000 1,510.00$ 250922 04/17/2025 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 343.38$ 250923 04/17/2025 WENDY HERNANDEZ CLEAR BAGS FOR SENIOR CENTER VALENTINES GRAMS 100-60-630-53100-00000 2.76$ 250923 04/17/2025 WENDY HERNANDEZ HDMI CABLE FOR BINGO MACHINE AT SENIOR CENTER 110-60-630-58110-00000 12.98$ 250922 04/17/2025 WALTERS WHOLESALE ELECTRIC CO. MATERIAL&SUPPLIES FOR BILDING MAINTENANCE 4/04/25 100-60-620-53100-00000 343.38$ 250922 04/17/2025 WALTERS WHOLESALE ELECTRIC CO. MATERIAL&SUPPLIES FOR BILDING MAINTENANCE 4/04/25 252-60-620-53100-00000 343.38$ 250922 04/17/2025 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 343.38$ 250920 04/17/2025 VICTORIA LOPEZ REIM-PLASTIC BOWLS FOR MLB CENTERPIECES 100-10-150-53370-11123 12.50$ 250920 04/17/2025 VICTORIA LOPEZ REIM-SPRAY BOTTLE FOR MLB BALLOON DECOR SHINE 100-10-150-53370-11123 9.91$ 250921 04/17/2025 VILLA LANDSCAPE PRODUCTS MATERIALS & SUPPLIES FOR TREE SECTION 240-50-561-53100-00000 1,801.15$ 250919 04/17/2025 VESTIS GROUP, INC UNIFORM SERVICE:BUILDING MAINTENANCE STAFF MAR 25 252-60-620-53100-00000 9.45$ 250919 04/17/2025 VESTIS GROUP, INC UNIFORM SERVICE:BUILDING MAINTENANCE STAFF MAR 25 100-60-620-53100-00000 29.76$ 250919 04/17/2025 VESTIS GROUP, INC UNIFORM SERVICE:BUILDING MAINTENANCE STAFF MAR 25 252-60-620-53100-00000 29.76$ 250919 04/17/2025 VESTIS GROUP, INC UNIFORM SERVICE:BUILDING MAINTENANCE STAFF MAR 25 100-60-620-53100-00000 9.45$ 250919 04/17/2025 VESTIS GROUP, INC MATERIALS & SUPPLIES FOR PD 252-60-620-53100-00000 9.45$ 250919 04/17/2025 VESTIS GROUP, INC UNIFORM SERVICE:BUILDING MAINTENANCE STAFF MAR 25 100-60-620-53100-00000 9.45$ 250918 04/17/2025 VERONICA FLORES CANCELLATION REIM RENTAL JULIA SR. CTR 9/13/2025 100-60-000-45601-00000 500.00$ 250919 04/17/2025 VESTIS GROUP, INC UNIFORM SERVICE:BUILDING MAINTENANCE STAFF MAR 25 100-60-620-53100-00000 9.45$ 250919 04/17/2025 VESTIS GROUP, INC UNIFORM SERVICE:BUILDING MAINTENANCE STAFF MAR 25 252-60-620-53100-00000 9.45$ 250916 04/17/2025 U.S. POSTAL SERVICE ANNUAL USPS MARKENG MAIL PERMIT#374 FOR BP 230-60-610-51100-11400 350.00$ 250917 04/17/2025 ULTIMATE ATTRACTIONS LLC BOUNCE HOUSE RENTAL FOR YOUTH SOCCER PRO.3/29/2025 501-60-000-22326-00000 375.00$ 250914 04/17/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY EAP FEES FOR 1/1/2025-3/31/2025 100-10-150-51101-00000 675.84$ 250915 04/17/2025 TRANSOURCE SERVICES CORP. 1 YEAR CISCO SYSTEM MANAGER ENTERPRISE LICENSE 401-10-140-53379-00000 252.40$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250962 04/24/2025 MUNICIPAL DENTAL POOL DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21211-00000 3,416.02$ 250962 04/24/2025 MUNICIPAL DENTAL POOL RETRO DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21211-00000 314.02$ 250962 04/24/2025 MUNICIPAL DENTAL POOL DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21253-00000 522.00$ 250962 04/24/2025 MUNICIPAL DENTAL POOL DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21211-00000 3,454.53$ 250962 04/24/2025 MUNICIPAL DENTAL POOL RETRO DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21211-00000 235.02$ 250962 04/24/2025 MUNICIPAL DENTAL POOL DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21253-00000 522.00$ 250962 04/24/2025 MUNICIPAL DENTAL POOL DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21253-00000 (39.50)$ 250962 04/24/2025 MUNICIPAL DENTAL POOL DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21211-00000 (38.51)$ 250962 04/24/2025 MUNICIPAL DENTAL POOL DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21211-00000 195.52$ 250961 04/24/2025 LIBERTY DENTAL PLAN DENTAL HMO - LIBERTY DENTAL 100-00-000-21211-00000 244.66$ 250961 04/24/2025 LIBERTY DENTAL PLAN DENTAL HMO - LIBERTY DENTAL 100-00-000-21253-00000 73.72$ 250962 04/24/2025 MUNICIPAL DENTAL POOL DENTAL PPO - MUNICIPAL SERVICES AUTHORITY 100-00-000-21211-00000 (77.02)$ 250961 04/24/2025 LIBERTY DENTAL PLAN DENTAL HMO - LIBERTY DENTAL 100-00-000-21211-00000 14.74$ 250961 04/24/2025 LIBERTY DENTAL PLAN DENTAL HMO - LIBERTY DENTAL 100-00-000-21211-00000 244.76$ 250961 04/24/2025 LIBERTY DENTAL PLAN DENTAL HMO - LIBERTY DENTAL 100-00-000-21253-00000 73.72$ 250960 04/24/2025 SOUTHLAND TRANSIT, INC. DIAL-A-RIDE SERVICES-BP MARCH 2025 244-50-580-51100-15520 30,813.60$ 250960 04/24/2025 SOUTHLAND TRANSIT, INC. FAREBOX REVENUE BP MARCH 2025 244-50-000-42151-00000 (3,054.50)$ 250960 04/24/2025 SOUTHLAND TRANSIT, INC. FAREBOX REVENUE BP MARCH 2025 244-50-000-42151-00000 (228.70)$ 250959 04/24/2025 WILLDAN ENGINEERING PERMIT TECHNICAN SERVICES DUE TO VACANCY - AUG.24 100-40-450-51100-00000 7,350.00$ 250960 04/24/2025 SOUTHLAND TRANSIT, INC. FIXED ROUTE SERVICES-BP MARCH 2025 244-50-580-51100-15525 120,356.93$ 250960 04/24/2025 SOUTHLAND TRANSIT, INC. FUEL COST BP MARCH 2025 244-50-580-51100-15525 4,211.95$ 250957 04/24/2025 MATTHEW BALZANO PER DIEM-BACKGROUND INVESTIGATION-5/6-5/9/2025 100-30-310-53200-00000 32.00$ 250958 04/24/2025 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 100-60-620-53100-00000 308.02$ 250958 04/24/2025 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 252-60-620-53100-00000 308.01$ 250954 04/24/2025 JOAN GASCA PER DIEM-MOTOROLA SUMMIT 2025 PUBLIC-5/12-5/15/25 100-30-310-53200-00000 280.00$ 250955 04/24/2025 LEWIS ENGRAVING INC MAILBOX NAME PLATE FOR NEW OFFICERS 100-30-310-53100-00000 96.14$ 250956 04/24/2025 MARIO ALCAZAR PER DIEM-POST SUPERVISORY-5/5-5/16/2025 100-30-310-53200-00000 80.00$ 250952 04/24/2025 HARRELL & COMPANY ADVISORS, LLC FY23-24 ANNUAL REPORT FOR POB 2019 651-00-000-51101-00000 1,750.00$ 250952 04/24/2025 HARRELL & COMPANY ADVISORS, LLC FY23-24 ANNUAL REPORT FOR REVENUE BONDS 2019 660-00-000-51101-15550 1,750.00$ 250953 04/24/2025 HINDERLITER, DE LLAMAS & ASSOCIATES SALES TAX-JAN-MAR 2025 100-25-299-51100-12410 1,141.83$ 250949 04/24/2025 FRANCISCO J. CARVENTE REMAINING BALANCE-MUSIC ENTER.-ZOCALO-5/2/2025 110-60-685-51101-00000 1,000.00$ 250950 04/24/2025 FRONTIER COMMUNICATIONS ACT#507995-PD PHONE-4/7-5/6/2025 100-30-340-53403-00000 106.64$ 250951 04/24/2025 GLENDA FLORES RENTAL DEPOSIT REFUND-4/12/2025-ARC 501-60-000-22333-00000 500.00$ 250947 04/24/2025 EAGLE PORTABLES INC PORTABLE RENTAL AT MORGAN PARK 100-60-620-53391-00000 1,167.56$ 250947 04/24/2025 EAGLE PORTABLES INC PORTABLE RESTROOM RENTALS FOR SPRING FEST-4/18/25 100-60-610-53391-16152 687.63$ 250948 04/24/2025 ESTEBAN MANJARREZ PER DIEM-INNOVATIVE PEER SUPPORT-5/5/-5/7/2025 100-30-310-53200-00000 24.00$ 250946 04/24/2025 DUNN-EDWARDS CORP PAINTING SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 166.98$ 250946 04/24/2025 DUNN-EDWARDS CORP PAINTING SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 (39.46)$ 250947 04/24/2025 EAGLE PORTABLES INC PORTABLE RESTROOM RENTALS-MORGAN PARK 100-60-620-53391-00000 1,317.56$ 250943 04/24/2025 DAVID LEON PER DIEM EXECUTIVE DEVELOPMENT COURSE 5/4-5/9/2025 100-30-310-53200-00000 473.00$ 250944 04/24/2025 DEPARTMENT OF JUSTICE MAR 2025-FINGERPRINTING SRVC 100-30-310-51100-00000 98.00$ 250945 04/24/2025 DISCOUNT SCHOOL SUPPLY ARTS&CRAFTS SUPPLIES FOR BASIC 100-60-650-53100-00000 251.87$ 250941 04/24/2025 CHARTER COMMUNICATIONS DATA CONNECTION FOR RADIO SYSTEMS 4/11-5/10/2025 100-30-340-53403-00000 395.60$ 250942 04/24/2025 DATA TICKET, INC. CITATION PROCESSING-FEB 2025-ENTITY 0365 0705 100-40-460-51101-00000 100.00$ 250943 04/24/2025 DAVID LEON PER DIEM-SUMMIT 2025 PUBLIC SAFETY-5/12-5/15/2025 100-30-310-53200-00000 280.00$ 250938 04/24/2025 BURRO CANYON SHOOTING PARK RANGE FEES FOR SWAT 100-30-340-53100-13040 90.00$ 250939 04/24/2025 CACEO WEBINAR-MASTERING THE WITNESS STAND 4/9/2025 100-40-460-53200-00000 60.00$ 250940 04/24/2025 CAROLINA RUIZ WILLS AGENT COMMISION-1837 PUENTE AVE 234-60-610-58150-56021 43,700.00$ 250937 04/24/2025 BALDWIN PARK YOUTH ATHLETIC ASSOCIATION MEASURE BP-COMMUNITY EMPOWERMENT GRANT AWARDEE 110-10-110-53370-11610 4,450.00$ 250938 04/24/2025 BURRO CANYON SHOOTING PARK RANGE FEES FOR PATROL 100-30-340-53100-00000 170.00$ 250938 04/24/2025 BURRO CANYON SHOOTING PARK RANGE FEES FOR TRAINEES 100-30-340-53100-00000 90.00$ 250935 04/24/2025 AXON ENTERPRISE, INC ANTENNA FOR POLICE UNITS 100-30-340-53100-00000 97.88$ 250935 04/24/2025 AXON ENTERPRISE, INC MOUNT AND BELT CLIP 100-30-340-53100-00000 187.85$ 250936 04/24/2025 BALDWIN PARK EASTSIDE LITTLE LEAGUE MEASURE BP-COMMUNITY EMPOWERMENT GRANT AWARDEE 110-10-110-53370-11610 4,310.00$ 250933 04/24/2025 AT&T JAN 2025-MOBILE DATA COMPUTERS-ACT#082045 100-30-310-53403-00000 3,163.18$ 250933 04/24/2025 AT&T MAR 2025-MOBILE DATA COMPUTERS-ACT#082045 100-30-310-53403-00000 1,581.59$ 250934 04/24/2025 AT&T MOBILITY ACT#928172-MOBILE DATA COMPUTERS-DUE 4/25/2025 100-30-310-53403-00000 1,744.31$ 250931 04/24/2025 ANA GOMEZ RENTAL DEPOSIT REFUND-SENIOR CENTER-5/24/2025 100-60-000-45601-00000 300.00$ 250932 04/24/2025 AT&T AC#34644-PHONE&WIRELESS SRVC-4/7-5/6/2025 100-30-340-53403-00000 48.22$ 250930 04/24/2025 ALEXA RAMIREZ REFUND-SPRING DAY CAMP REGIS.-FAM. EMER.-4/21-4/25 100-60-000-42602-00000 90.00$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number 250983 04/24/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SPRING FEST & EGG HUNT 100-60-610-53100-16152 1,537.45$ 250983 04/24/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SPRING FEST & EGG HUNT 100-60-610-53100-16152 109.93$ 250983 04/24/2025 SMART & FINAL MATERIALS & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 18.77$ 250983 04/24/2025 SMART & FINAL MATERIALS & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 13.25$ 250983 04/24/2025 SMART & FINAL MATERIALS & SUPPLIES FOR SPRING FEST & EGG HUNT 100-60-610-53100-16152 68.05$ 250980 04/24/2025 ROBERT LOPEZ PER DIEM LACPCA TRI-COUNTY SPRING CONF.4/8-4/11/25 100-30-310-53200-00000 301.00$ 250981 04/24/2025 SERGIO GARCIA SUPPLIES FOR THE DAY ACTIVITY BOOTCAMP 029 220-30-340-53360-14880 49.73$ 250982 04/24/2025 SERVICE FIRST CONTRACTORS MAINTENANCE TO AQUATIC CENTER POOL 4/9/2025 100-60-620-53371-00000 3,292.93$ 250978 04/24/2025 RIO HONDO COMM. COLLEGE TUITION SUPERVISORY COURSE 5/5-5/16/2025 100-30-310-53200-00000 228.00$ 250979 04/24/2025 RIVERSIDE COUNTY SHERIFF / BEN CLARK TRAINING CENTER TUITION FOR DRUG INFLUENCE COURSE 5/28/2025 100-30-310-53200-00000 95.00$ 250979 04/24/2025 RIVERSIDE COUNTY SHERIFF / BEN CLARK TRAINING CENTER BACKGROUND INVESTIGATION TRAINING 5/6-5/9/2025 100-30-310-53200-00000 330.00$ 250976 04/24/2025 QUINN COMPANY MAINTENANCE & REPAIRS CITY YARD GENERATOR 3/27/25 100-60-620-53371-00000 1,929.44$ 250977 04/24/2025 RICHARD SOONG BUSINESS CARD FOR NEW OFFICER, REPRINT NAME CHANGE 100-40-460-53320-00000 62.50$ 250977 04/24/2025 RICHARD SOONG BUSINESS CARD FOR NEW OFFICER, REPRINT NAME CHANGE 100-40-460-53320-00000 62.50$ 250976 04/24/2025 QUINN COMPANY MAINTENANCE & REPAIRS CITY YARD GENERATOR 3/27/25 100-60-620-53371-00000 1,340.77$ 250976 04/24/2025 QUINN COMPANY MAINTENANCE & REPAIRS CITY YARD GENERATOR 3/27/25 100-60-620-53371-00000 1,351.79$ 250976 04/24/2025 QUINN COMPANY MAINTENANCE & REPAIRS CITY YARD GENERATOR 3/27/25 100-60-620-53371-00000 1,878.47$ 250974 04/24/2025 PORSCHE RUNGROTEVNICH PER DIEM 2025 PUBLIC SAFETY CONFERENCE 5/12-15/25 100-30-310-53200-00000 280.00$ 250975 04/24/2025 PUBLIC SAFETY DEVELOPMENT GROUP TUITION-INNOVATIVE PEER SUPPORT 5/5-5/7/2025 100-30-310-53200-00000 300.00$ 250976 04/24/2025 QUINN COMPANY RENTAL OF GENERATOR CITY YARD 3/10/2025 100-60-620-53391-00000 4,866.72$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY LIFE INS C/100,000 100-00-000-21254-00000 33.00$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY LIFE INS D/60,000 100-00-000-21254-00000 24.75$ 250973 04/24/2025 NICHOLS LUMBER & HARDWARE SUPPLIES FOR YOUTH SPORTS PROGRAM 501-60-000-22326-00000 72.70$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY LIFE INS D/60,000 100-00-000-21254-00000 24.75$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY SUPP. LIFE - LINCOLN NATIONAL 100-00-000-21212-00000 624.78$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY LIFE INS B/50,000 100-00-000-21254-00000 680.03$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY SUPP. LIFE - LINCOLN NATIONAL 100-00-000-21212-00000 530.97$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY LIFE INS B/50,000 100-00-000-21254-00000 715.44$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY LIFE INS C/100,000 100-00-000-21254-00000 33.00$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY LIFE INS B/50,000 100-00-000-21254-00000 (8.24)$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY LIFE INS B/50,000 100-00-000-21254-00000 (4.12)$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY LIFE INS C/100,000 100-00-000-21254-00000 115.50$ 250971 04/24/2025 PRE-PAID LEGAL SERVICES, INC. PRE-PAID LEGAL SERVICES 100-00-000-21230-00000 55.80$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY MAY 2025 PREMIUM-BASIC LIFE;AD&D;STD;LTD INSURANCE 403-10-160-54130-00000 (6,400.83)$ 250972 04/24/2025 THE LINCOLN NATIONAL LIFE INSURANCE COMPANY MAY 2025 PREMIUM-BASIC LIFE;AD&D;STD;LTD INSURANCE 403-10-160-54130-00000 4,786.72$ 250970 04/24/2025 CITY EMPLOYEES ASSOCIATES DUES CMEA 100-00-000-21226-00000 46.00$ 250970 04/24/2025 CITY EMPLOYEES ASSOCIATES DUES CMEA 100-00-000-21226-00000 46.00$ 250971 04/24/2025 PRE-PAID LEGAL SERVICES, INC. PRE-PAID LEGAL SERVICES 100-00-000-21230-00000 55.80$ 250968 04/24/2025 BALDWIN PARK MNGMT ASSOC. MANAGEMENT DUES 100-00-000-21218-00000 10.00$ 250969 04/24/2025 C.L.E.A. CLEA DISABILITY POLICE SWORN 403-10-000-47130-13404 976.00$ 250969 04/24/2025 C.L.E.A. CLEA DISABILITY POLICE SWORN 403-10-000-47130-13404 752.00$ 250966 04/24/2025 AMERICAN FIDELITY ASSURANCE COMPANY AMERICAN FIDELITY ASSURANCE COMPANY 100-00-000-21216-00000 935.81$ 250966 04/24/2025 AMERICAN FIDELITY ASSURANCE COMPANY AMERICAN FIDELITY ASSURANCE COMPANY 100-00-000-21216-00000 2,850.73$ 250967 04/24/2025 BALDWIN PARK MNGMT ASSOC. MANAGEMENT DUES 100-00-000-21218-00000 10.00$ 250966 04/24/2025 AMERICAN FIDELITY ASSURANCE COMPANY AMERICAN FIDELITY ASSURANCE COMPANY 100-00-000-21216-00000 74.76$ 250966 04/24/2025 AMERICAN FIDELITY ASSURANCE COMPANY AMERICAN FIDELITY ASSURANCE COMPANY 100-00-000-21216-00000 935.81$ 250966 04/24/2025 AMERICAN FIDELITY ASSURANCE COMPANY AMERICAN FIDELITY ASSURANCE COMPANY 100-00-000-21216-00000 2,850.71$ 250965 04/24/2025 ALLSTATE WORKPLACE DIVISION CANCER INSURANCE 100-00-000-21221-00000 51.80$ 250965 04/24/2025 ALLSTATE WORKPLACE DIVISION CANCER INSURANCE 100-00-000-21221-00000 51.81$ 250966 04/24/2025 AMERICAN FIDELITY ASSURANCE COMPANY AMERICAN FIDELITY ASSURANCE COMPANY 100-00-000-21216-00000 31.12$ 250964 04/24/2025 AFLAC AFLAC 100-00-000-21216-00000 55.55$ 250964 04/24/2025 AFLAC AFLAC 100-00-000-21216-00000 672.39$ 250964 04/24/2025 AFLAC AFLAC 100-00-000-21216-00000 55.44$ 250963 04/24/2025 STANDARD INSURANCE COMPANY VISION - STANDARD INSURANCE COMPANY 100-00-000-21258-00000 1,008.51$ 250963 04/24/2025 STANDARD INSURANCE COMPANY VISION - STANDARD INSURANCE COMPANY 100-00-000-21258-00000 78.24$ 250964 04/24/2025 AFLAC AFLAC 100-00-000-21216-00000 672.39$ 250963 04/24/2025 STANDARD INSURANCE COMPANY VISION - STANDARD INSURANCE COMPANY 100-00-000-21258-00000 53.94$ 250963 04/24/2025 STANDARD INSURANCE COMPANY VISION - STANDARD INSURANCE COMPANY 100-00-000-21258-00000 1,008.00$ 250963 04/24/2025 STANDARD INSURANCE COMPANY VISION - STANDARD INSURANCE COMPANY 100-00-000-21258-00000 (14.70)$ 250963 04/24/2025 STANDARD INSURANCE COMPANY VISION - STANDARD INSURANCE COMPANY 100-00-000-21258-00000 (7.35)$
AmountPayment Number Payment Date Vendor Name Description (Item) Account Number DFT0010974 04/24/2025 S.E.I.U. LOCAL 721 DUES: APRIL 2025 PP#07-08 100-00-000-21220-00000 90.00$ DFT0010974 04/24/2025 S.E.I.U. LOCAL 721 DUES: APRIL 2025 PP#07-08 100-00-000-21220-00000 3.00$ Grand Total: 4,516,517.26$
DFT0010960 04/16/2025 COVINA ESCROW COMPANY INC. ESCROW NO:28014 FOR PROPERTY LOCATED 1837 PUENTE 234-60-610-58150-56021 297,293.00$ DFT0010960 04/16/2025 COVINA ESCROW COMPANY INC. ESCROW NO:28014 FOR PROPERTY LOCATED 1837 PUENTE 270-60-610-58150-56021 2,000,000.00$ DFT0010974 04/24/2025 S.E.I.U. LOCAL 721 DUES: APRIL 2025 PP#07-08 100-00-000-21220-00000 1,646.51$ DFT0010874 04/24/2025 PERS-RETIREMENT PERS MISC CITY PAID 100-00-000-21256-00000 21,631.03$ DFT0010875 04/24/2025 PERS-RETIREMENT PERS MISC CITY PAID - PEPRA 100-00-000-21256-00000 21,482.14$ DFT0010886 04/24/2025 PERS-RETIREMENT ROUNDING DIFFERENCE 100-25-299-53370-00000 (0.21)$ DFT0010871 04/24/2025 PERS-RETIREMENT PERS SWORN CITY PAID - PEPRA 100-00-000-21256-00000 25,675.64$ DFT0010872 04/24/2025 PERS-RETIREMENT PERS SWORN ER REG PAY 100-00-000-21256-00000 24,288.94$ DFT0010873 04/24/2025 PERS-RETIREMENT PT PERS MISC CITY PAID 100-00-000-21256-00000 517.04$ DFT0010849 04/24/2025 PERS-RETIREMENT PERS MISC 350 100-00-000-21206-00000 14,864.43$ DFT0010850 04/24/2025 PERS-RETIREMENT PERS SWORN 351 100-00-000-21206-00000 8,001.47$ DFT0010851 04/24/2025 PERS-RETIREMENT PERS MISC 352 100-00-000-21206-00000 13,514.99$ DFT0010846 04/24/2025 PERS-RETIREMENT PERS SURVIVOR RETIREMENT 100-00-000-21207-00000 191.58$ DFT0010847 04/24/2025 PERS-RETIREMENT PERS REDEPOSIT 100-00-000-21206-00000 21.78$ DFT0010848 04/24/2025 PERS-RETIREMENT PERS SWORN- 344 100-00-000-21206-00000 25,656.96$ DFT0010812 04/28/2025 PERS-RETIREMENT PERS MISC 352 100-00-000-21206-00000 120.00$ DFT0010816 04/28/2025 PERS-RETIREMENT PERS MISC CITY PAID 100-00-000-21256-00000 143.04$ DFT0010817 04/28/2025 PERS-RETIREMENT PERS MISC CITY PAID - PEPRA 100-00-000-21256-00000 190.72$ DFT0010784 04/10/2025 PERS-RETIREMENT ROUNDING DIFFERENCE 100-25-299-53370-00000 (0.18)$ DFT0010810 04/28/2025 PERS-RETIREMENT PERS SURVIVOR RETIREMENT 100-00-000-21207-00000 12.00$ DFT0010811 04/28/2025 PERS-RETIREMENT PERS MISC 350 100-00-000-21206-00000 96.00$ DFT0010771 04/10/2025 PERS-RETIREMENT PT PERS MISC CITY PAID 100-00-000-21256-00000 554.66$ DFT0010772 04/10/2025 PERS-RETIREMENT PERS MISC CITY PAID 100-00-000-21256-00000 21,613.62$ DFT0010773 04/10/2025 PERS-RETIREMENT PERS MISC CITY PAID - PEPRA 100-00-000-21256-00000 20,239.34$ DFT0010748 04/10/2025 PERS-RETIREMENT PERS MISC 352 100-00-000-21206-00000 12,734.48$ DFT0010769 04/10/2025 PERS-RETIREMENT PERS SWORN CITY PAID - PEPRA 100-00-000-21256-00000 24,293.12$ DFT0010770 04/10/2025 PERS-RETIREMENT PERS SWORN ER REG PAY 100-00-000-21256-00000 24,478.53$ DFT0010745 04/10/2025 PERS-RETIREMENT PERS SWORN- 344 100-00-000-21206-00000 24,275.44$ DFT0010746 04/10/2025 PERS-RETIREMENT PERS MISC 350 100-00-000-21206-00000 14,878.03$ DFT0010747 04/10/2025 PERS-RETIREMENT PERS SWORN 351 100-00-000-21206-00000 8,063.93$ 250990 04/24/2025 ZACHARY GOBLE PER DIEM FOR DRUG INFLUENCE COURSE 5/28/2025 100-30-310-53200-00000 8.00$ DFT0010743 04/10/2025 PERS-RETIREMENT PERS SURVIVOR RETIREMENT 100-00-000-21207-00000 187.86$ DFT0010744 04/10/2025 PERS-RETIREMENT PERS REDEPOSIT 100-00-000-21206-00000 21.78$ 250987 04/24/2025 THE SHREDDERS FIN-DESTRUCTION OF CONFIDENTIAL DOC. MAR 2025 100-20-210-51101-00000 60.50$ 250988 04/24/2025 T-MOBILE PHONE-55455-POLICE DEPARTMENT 2/21-3/20/25 100-30-310-53403-00000 2,163.29$ 250989 04/24/2025 YESIKA TAMAYO REFUND -RENTAL DEPOSIT EVENT HELD AT ARC 4/5/2025 501-60-000-22333-00000 500.00$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 4/3/2025 100-60-620-53371-00000 59.00$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 4/3/2025 100-60-620-53371-00000 169.00$ 250986 04/24/2025 TERRA REALTY ADVISORS INC BILLBOARD CONSULTING 2/5-3/16/2025 100-40-405-51100-00000 1,342.23$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 4/2/2025 100-60-620-53371-00000 83.00$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 4/2/2025 100-60-620-53371-00000 158.00$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 4/3/2025 100-60-620-53371-00000 124.76$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 4/2/2025 100-60-620-53371-00000 65.42$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 4/2/2025 100-60-620-53371-00000 141.00$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 4/2/2025 100-60-620-53371-00000 219.00$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 3/4/2025 100-60-620-53371-00000 151.20$ 250985 04/24/2025 TERMINIX EXTERMINATOR SERVICES AT CITY FACILITIES 4/2/2025 100-60-620-53371-00000 157.00$ 250984 04/24/2025 STEPHAN HOLGUIN PER DIEM FIREARMS DETECTION COURSE 5/26-7/4/2025 100-30-310-53200-00000 240.00$
STAFF REPORT
ITEM NO. _____2_____
TO: Honorable Mayor and Members of the City Council
FROM: Shirley Quinones, Chief Deputy City Clerk
DATE: May 7, 2025
SUBJECT: Meeting Minutes of April 16, 2025
SUMMARY
The City Council held the following meetings on April 16, 2025; Special City Council Meeting, Regular City Council Meeting, Finance Authority Meeting and Housing Authority Meeting.
RECOMMENDATION
It is recommended that the City Council approve the following meetings minutes of the Special City Council Meeting, Regular City Council Meeting, Finance Authority Meeting and the Housing Authority Meeting held on April 16, 2025.
FISCAL IMPACT
There is no fiscal impact associated with this item.
ALTERNATIVES
None
LEGAL REVIEW
This report does not require legal review.
ATTACHMENTS
1. Meeting Minutes of April 16, 2025
CITY COUNCIL
SPECIAL MEETING
Minutes
April 16, 2025, 5:00 PM
Mayor
Mayor Pro Tem
Councilmember
Councilmember
Councilmember
Alejandra Avila
Daniel Damian
Jean M. Ayala
Emmanuel J. Estrada
Manuel Lozano
These minutes are presented in Agenda order.
CALL TO ORDER
The meeting was called to order at approximately 5:07 p.m. by Mayor Avila.
ROLL CALL
City Clerk Saenz performed roll call:
MEMBERS:
City Council Member Jean M. Ayala (present)
City Council Member Emmanuel J. Estrada (present)
City Council Member Manuel Lozano (present)
Mayor Pro Tem Daniel Damian (present)
Mayor Alejandra Avila (present)
PUBLIC COMMUNICATIONS
Mayor Avila opened Public Communication at approximately 5:08 p.m. Seeing no one wishing to speak, public communications was closed.
OPEN SESSION/STUDY SESSION
Nick Baldwin, Acting Director for Community Development and Habitat for Humanity presented updates on Stewart and Torch Projects
RECESS CLOSED SESSION – City Council recessed at approximately 6:09 p.m.
1. Conference with Legal Counsel – Anticipated Litigation Pursuant to paragraph (2) of subdivision (d) of Government Code Section 54956.9:
Potential Case(s): One (1)
Updates given, no reportable action
2. Public Employee Appointment § 54957(b)(1)
Title: City Attorney
Updates given, no reportable action
ADJOURNMENT
The meeting was adjourned at approximately 7:26 p.m. by Mayor Avila.
APPROVED: May 7, 2025
ATTEST:
________________________
Christopher Saenz, City Clerk
Alejandra Avila, Mayor
4-16-2025 Regular_Finance Authority_Housing Authority Meeting Minutes
CITY COUNCIL
REGULAR MEETING
Minutes
April 16, 2025, 7:00 PM
Mayor
Mayor Pro Tem
Councilmember
Councilmember
Councilmember
Alejandra Avila
Daniel Damian
Jean M. Ayala
Emmanuel J. Estrada
Manuel Lozano
These minutes are presented in Agenda order.
CALL TO ORDER
The meeting was called to order at approximately 7:08 p.m. by Mayor Avila.
INVOCATION
The invocation was give by Pastor Flores and Pastor Jackson.
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Council Member Emmanuel J. Estrada.
ROLL CALL
Chief Deputy City Clerk Quinones performed roll call:
MEMBERS:
City Council Member Jean M. Ayala (present)
City Council Member Emmanuel J. Estrada (present)
City Council Member Manuel Lozano (present)
Mayor Pro Tem Daniel Damian (present)
Mayor Alejandra Avila (present)
REPORT FROM CLOSED SESSION
Assistant City Attorney Ornelas Lopez announced that the City Council met in closed session on the item listed on the Special meeting Agenda, all the members were present and there is no reportable action.
ANNOUNCEMENTS
Councilmember Lozano requested to recognize two individuals into the records that made an impact to the Baldwin Park Community that has recently passed away: Alma Belin Viegas and Nicholas Romo Flores.
The Mayor announced that t he City Council are also members of the Board of Directors of the Housing Authority and Finance Authority which are concurrently convening with the City Council this evening and each Council Member is paid an additional stipend of $30 for attending the Housing Authority meeting and $50 for attending the Finance Authority meeting.
PROCLAMATIONS, COMMENDATIONS & PRESENTATIONS
PUBLIC COMMUNICATIONS
Mayor Avila opened Public Communications at approximately 7:15 p.m., the following spoke:
1) Julie 2) Susan Cole 3) Teresa Tapia Seeing no one else wishing to speak public communications was closed.
4-16-2025 Regular_Finance Authority_Housing Authority Meeting Minutes
CONSENT CALENDAR
All items listed are considered to be routine business by the City Council and will be approved with one motion. There will be no separate discussion of these items unless a City Councilmember so requests, in which case, the item will be removed from the general order of business and considered in its normal sequence on the agenda.
1. City of Baldwin Park’s Warrants and Demands
Motion to ratify the attached Warrants and Demands Register.
MOTION: It was moved by Alejandra Avila, seconded by Manuel Lozano to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
2. Treasurer’s Report City (CC) – February 2025
Motion to receive and file the Treasurer’s Report for February 2025.
MOTION: It was moved by Alejandra Avila, seconded by Manuel Lozano to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
3. Meeting Minutes of April 2, 2025
Motion to approve the following meeting minutes of the Special City Council Meeting and the Regular City Council Meeting held on April 2, 2025.
MOTION: It was moved by Alejandra Avila, seconded by Manuel Lozano to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
4. Proposal to Consider Adoption of the Los Angeles County “Good Neighbor Pledge” to Support Regional Homelessness Solutions
Motion to:
1. Approve joining the Los Angeles County Homeless Initiative “Good Neighbor Pledge” for coordinated regional solutions to homelessness; and
2. Authorize Mayor and City Council to execute the Los Angeles County Homeless Initiative “Good Neighbor Pledge” on behalf of the City of Baldwin Park.
MOTION: It was moved by Alejandra Avila, seconded by Manuel Lozano to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
5. Approve Second Amendments to the Professional Service Agreements (PSAs) with David Volz Design, Evan Brooks and Associates (EBA), Infrastructure Engineers a Bowman Company, John L. Hunter and Associates, Onward Engineering, RKA Consulting Group, TAIT and Associates and Willdan Engineering to Extend Term for One-Year.
Motion to approve the Second Amendments to the current Professional Services Agreements for a one-year term extension with the Consulting Firms and Authorize the Mayor to execute the Second Amendments to the PSAs.
MOTION: It was moved by Alejandra Avila, seconded by Manuel Lozano to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
4-16-2025 Regular_Finance Authority_Housing Authority Meeting Minutes
6. Claim Rejection
It is recommended that the City Council reject the following claim and direct staff to send the appropriate notice of rejection to claimant:
• Martin Herrera The claimant alleges whistleblower retaliation.
Item #6 was pulled for further discussion
Motion to reject recommendation by Jean M Ayala, seconded by Manuel Lozano – Motion failed – AYES: AYALA, LOZANO – NOES: ESTRADA, DAMIAN, AVILA
MOTION to reject the following claim and direct staff to send the appropriate notice of rejection to claimant, Martin Herrera. It was moved by Emmanuel Estrada, seconded by Daniel Damian to adopt Motion Passed [3 – 2]. AYES: ESTRADA, DAMIAN, AVILA - NOES: AYALA, LOZANO
7. Second Reading and Adoption of Ordinance 1517, entitled, “ An Ordinance Of The City Council Of The City Of Baldwin Park To Amend Section 153.220.240 Of The Municipal Code Relating To Warehouses And Wholesale Sales And Revise Table 153.050.020 In The City’s Municipal Code As It Relates To Permitted And Conditionall y Permitted Uses In The Industrial “I” And Industrial Commercial “I -C” Zones And Finding The Action Exempt From CEQA Pursuant To Section 15060(B)(3) Of The CEQA Guidelines”.
Motion to waive further reading and adopt, Ordinance 1517, entitled: “ AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK TO AMEND SECTION 153.220.240
OF THE MUNICIPAL CODE RELATING TO WAREHOUSES AND WHOLESALE SALES AND REVISE TABLE 153.050.020 IN THE CITY’S MUNICIPAL CODE AS IT RELATES TO PERMITTED AND CONDITIONALL Y PERMITTED USES IN THE INDUSTRIAL “I” AND INDUSTRIAL COMMERCIAL “I-C” ZONES AND FINDING THE ACTION EXEMPT FROM CEQA PURSUANT TO SECTION 15060(b)(3) OF THE CEQA GUIDELINES.
MOTION: It was moved by Alejandra Avila, seconded by Manuel Lozano to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
PUBLIC HEARING
8. Conduct Public Hearing to receive public input on housing and community development needs concerning the five -year 2025-2029 Consolidated Plan and FY 2025 -2026 Annual Action Plan for the Community Development Block Grant (CDBG) and Home Investment Partnership Program (HOME) programs.
Mayor Avila opened Public Hearing to receive public input on the Five-Year 2025-2029 Consolidated Plan and FY 2025-2026 Annual Action Plan. at approximately 7:29 p.m., a brief summary was given by Avant Garde.
Seeing no one wishing to speak public hearing was closed.
4-16-2025 Regular_Finance Authority_Housing Authority Meeting Minutes
REPORTS OF OFFICERS
9. Approval of Employment Agreement with Daniel Padilla for the position of Director of Public Works
Motion to:
1. Approve the Employment Agreement with Daniel Padilla for the position of Director of Public Works, subject to any non-substantive changes made by Chief Executive Officer and the City Attorney, and subject to conditions precedent reflected in the agreement; and
2. Authorize the Mayor and City Clerk to execute the Employment Agreement with Daniel Padilla.
MOTION: It was moved by Manuel Lozano, seconded by Jean M Ayala to close public hearing Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
CITY COUNCIL ACTING AS SUCCESSOR AGENCY OF THE DISSOLVED COMMUNITY
DEVELOPMENT COMMISSION
SA 1. Treasurer’s Report SA – February 2025
Motion to receive and file the Treasurer’s Report for February 2025.
MOTION: It was moved by Manuel Lozano, seconded by Jean M Ayala to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
FINANCE AUTHORITY CONSENT CALENDAR
1. Treasurer’s Report FA – February 2025
Motion to receive and file the Treasurer’s Report for February 2025.
MOTION: It was moved by Daniel Damian , seconded by Manuel Lozano to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
HOUSING AUTHORITY CONSENT CALENDAR
1. Baldwin Park Housing Authority’s Warrants and Demands Motion to ratify the attached Warrants and Demands Register.
MOTION: It was moved by Manuel Lozano, seconded by Jean M Ayala to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
2. Treasurer’s Report HA – February 2025
Staff recommends that the Board receive and file the Treasurer’s Report for February 2025.
MOTION: It was moved by Manuel Lozano, seconded by Jean M Ayala to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
4-16-2025 Regular_Finance Authority_Housing Authority Meeting Minutes
3. Consideration to adopt Resolution No. HA 2025-002, Authorizing the Housing Authority of the City of Baldwin Park to execute the Declaration of Trust (DOT) for McNeill Manor and authorizing a signatory to execute and bind the Authority to the terms of the DOT It is recommended that the Housing Authority Board:
1. Approve Resolution No HA 2025-002 as required by the U.S. Department of Housing and Urban Development (HUD).
MOTION: It was moved by Manuel Lozano, seconded by Jean M Ayala to adopt Motion Passed [5 – 0]. AYES: ESTRADA, DAMIAN, AVILA, AYALA, LOZANO
CITY COUNCIL / CITY CLERK / CITY TREASURER / STAFF REQUESTS & COMMUNICATION
Councilmember Ayala congratulated St. John the Baptist cheerleaders wining the SHARP State Championship again and sought consensus of the City Council to have them return to acknowledge the team.
Mayor Pro Tem Daniel Damian sought consensus of the City Council to change the name of Community Enhancement to Code Enforcement Department and to bring back a staff report.
Councilmember Estrada sought consensus of the City Council to bring back update of the Hometown Heros Banners.
ADJOURNMENT
The meeting was adjourned at approximately 7:50 p.m. by Mayor Avila.
APPROVED: May 7, 2025
ATTEST:
________________________
Christopher Saenz, City Clerk
Alejandra Avila, Mayor
STAFF REPORT
ITEM NO. _____3_____
TO: Honorable Mayor and Members of the City Council
FROM: Enrique C. Zaldivar, Chief Executive Officer
PREPARED BY: Lena Abdullah, Management Analyst
DATE: May 7, 2025
SUBJECT: Resolution No. 202 5-006 Initiating the Proceedings and Ordering Preparation of the Engineer’s Report for the Parks Maintenance Assessment District for FY2025-2026
SUMMARY
This report requests that the City Council consider the adoption of Resolution No. 2025 -006, which would authorize the initiation of the FY2025 -2026 Parks Maintenance Assessment District (PMAD) and order the preparation of the Engineers report.
RECOMMENDATION
Staff recommends that Council adopt Resolution No. 2025-006entitled, “A Resolution of the City Council of the City of Baldwin Park, California, authorizing the initiation of the proceedings and ordering the preparation of the Engineer’s Report for the FY 2025 -2026 levy of annual assessments for the Parks Maintenance Assessment District pursuant to the provisions of Division 15, Part 2 of the State of California Streets and Highways Code.”
FISCAL IMPACT
The Park Maintenance Assessment District Fund 252 for FY2025 -2026 will be estimated in the Engineer’s Report. It will provide detailed fiscal analysis including any anticipated subsidy participation by the General Fund. The cost of the Engineer’s Report wi ll be $3,000 and it has already been included in the approved FY24 - 25 budget from fund 252.
BACKGROUND
The City has an annual program for the maintenance of City parks. Financial support for this program is provided through the PMAD. The PMAD, formed in FY1996-1997, was established in conformance with Proposition 218.
The provisions of the Landscape and Lighting Act of 1972, Part 2 of Division 15 of the State of California Streets and Highways Code directs the preparation of the annual engineer’s report for each fiscal year for which assessments are to be levied and collected as necessary for the continual maintenance of im provements. The adoption of the resolution is required to initiate the annual proceedings and order the preparation of the Engineers Report.
ALTERNATIVES
There are no alternatives.
CEQA REVIEW
The action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it is not a “project” under Section 15378(b)(5) of CEQA Guidelines. The action involves an organizational or administrative activity of government that will not result in the direct or indirect physical change in the environment.
LEGAL REVIEW
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS
1. Resolution No 2025-006
RESOLUTION NO. 2025-006
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK,
CALIFORNIA, AUTHORIZING THE INITIATION OF THE PROCEEDINGS AND ORDERING THE PREPARATION OF THE ENGINEER’S REPORT FOR THE FY 202 5-2026 LEVY OF
ANNUAL ASSESSMENTS FOR THE PARKS MAINTENANCE ASSESSMENT DISTRICT PURSUANT TO THE PROVISIONS OF DIVISION 15, PART 2 OF THE STATE OF CALIFORNIA STREETS AND HIGHWAYS CODE.
WHEREAS, the City Council of the City of Baldwin Park has previously formed a Parks Maintenance Assessment District (hereinafter referred to as the District) pursuant to the terms and provisions of the "Landscaping and Lighting Act of 1972", Division 15, Part 2 of the Streets and Highways Code of the State of California; and
WHEREAS, the City Council desires to conduct proceedings to provide for the annual levy of assessments for the next ensuing fiscal year, to provide for the costs and expenses necessary for continual maintenance of improvements within said District; and
WHEREAS, the provisions of said Division 15, Part 2, require a n annual written report in accordance with Chapter 3 (commencing with Section 22620).
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES RESOLVE AS FOLLOWS:
SECTION 1. That the above recitals are all true, correct, and are hereby incorporated.
SECTION 2. The Director of Public Works is hereby ordered to prepare and file a report relating to the FY 2025-26 levy of annual assessments for said District in accordance with the Provisions of Chapter 3 (commencing with Section 22620) of Division 15, Part 2 of the State of California Streets and Highways Code.
SECTION 3. Upon completion, said Report shall be filed with the City Clerk for submission to the City Council for its consideration pursuant to Section 22623 of said Streets and Highways Code.
PASSED, APPROVED, AND ADOPTED this 7th day of May 2025.
__________________
Alejandra Avila
Mayor
ATTEST:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS:
CITY OF BALDWIN PARK )
I, Christopher Saenz, City Clerk of the City of Baldwin Park do hereby certify that the foregoing Resolution No. 2025-006 was duly adopted by the City Council of the City of Baldwin Park at a regular meeting thereof held on May 7, 2025, and that the same was adopted by the following vote to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
_________________________
Christopher Saenz
City Clerk
STAFF REPORT
ITEM NO. _____4_____
TO: Honorable Mayor and Members of the City Council
FROM: Enrique C. Zaldivar, Chief Executive Officer
PREPARED BY: Lena Abdullah, Management Analyst
DATE: May 7, 2025
SUBJECT: Resolution No. 2025 -007 Initiating the Proceedings and Ordering Preparation of the Engineer’s Report for the
Citywide Landscape and Lighting Maintenance Assessment
District for FY2025-2026
SUMMARY
This report requests that the City Council adopt Resolution No. 2025-007 authorizing the initiation of the FY2025- 2026 Citywide Landscaping and Lighting Maintenance Assessment District (LLMD) and order the preparation of the Engineers Report.
RECOMMENDATION
Staff recommends that Council adopt Resolution No. 2025-007 entitled, “A Resolution of the City Council of the City of Baldwin Park, California, authorizing the initiation of the proceedings and ordering the preparation of the Engineer’s Report for the FY2025 -2026 levy of annual assessments for the City of Baldwin Park Landscaping and Lighting Mainte nance District pursuant to the provisions of Division 15, Part 2 of the State of California Streets and Highway Code.”
FISCAL IMPACT
The Engineer’s Report will include an in -depth analysis of anticipated revenues and expenditures. The cost to operate and maintain the landscaping and lighting improvements is planned to be in balance with the revenue.
The revenues and cost for FY2025 -2026 are expected to be in -line with the FY2024 -2025 LLMD budget. The cost to prepare the Engineer’s Report is $4,500 and is included in FY 24-25 approved budget for fund 251.
BACKGROUND
The City has an annual program for the maintenance landscaping and lighting improvements, as well as open space improvements, including the maintenance and operation of traffic signals, street lights, median landscaping, and street trees. For the past 31 years this program has been funded through the annual special assessments of the LLMD. The provisions of the Landscape and Lighting Act of 1972, Part 2 of Division 15 of the State of California Streets and Highway Codes directs the preparation of the annual Engineer’s Report for each fiscal year for which assessments are to be levied and collected as necessary for the continual maintenance of improvements. The adoption of a resolution is required to initiate the proceedings and order the preparation of an Engineers Report.
ALTERNATIVES
There are no alternatives.
CEQA REVIEW
The action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it is not a “project” under Section 15378(b)(5) of CEQA Guidelines. The action involves an organizational or administrative activity of government that will not result in the direct or indirect physical change in the environment.
LEGAL REVIEW
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS
1. Resolution No. 2025-007
RESOLUTION NO. 2025-007
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK,
CALIFORNIA, AUTHORIZING THE INITIATION OF THE PROCEEDINGS AND ORDERING THE PREPARATION OF THE ENGINEER’S REPORT FOR THE FY 202 5-2026 LEVY OF
ANNUAL ASSESSMENTS FOR THE CITY OF BALDWIN PARK LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT PURSUANT TO THE PROVISIONS OF DIVISION 15, PART 2 OF THE STATE OF CALIFORNIA STREETS AND HIGHWAYS CODE.
WHEREAS, the City Council of the City of Baldwin Park has previously formed a Landscaping and Lighting Maintenance District (hereinafter referred to as the District) pursuant to the terms and provisions of the "Landscaping and Lighting Act of 1972", Division 15, Part 2 of the Streets and Highways Code of the State of California; and
WHEREAS, the City Council desires to conduct proceedings to provide for the annual levy of assessments for the next ensuing fiscal year, to provide for the costs and expenses necessary for continual maintenance of improvements within said District; and
WHEREAS, the provisions of said Division 15, Part 2, require a n annual written report in accordance with Chapter 3 (commencing with Section 22620).
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES RESOLVE AS FOLLOWS:
SECTION 1. That the above recitals are all true, correct, and are hereby incorporated.
SECTION 2. The Director of Public Works is hereby ordered to prepare and file a report relating to the FY 2025-26 levy of annual assessments for said District in accordance with the Provisions of Chapter 3 (commencing with Section 22620) of Division 15, Part 2 of the State of California Streets and Highways Code.
SECTION 3. Upon completion, said Report shall be filed with the City Clerk for submission to the City Council for its consideration pursuant to Section 22623 of said Streets and Highways Code.
PASSED, APPROVED, AND ADOPTED this 7th day of May 2025.
__________________
Alejandra Avila
Mayor
ATTEST:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS:
CITY OF BALDWIN PARK )
I, Christopher Saenz, City Clerk of the City of Baldwin Park do hereby certify that the foregoing Resolution No. 2025-007 was duly adopted by the City Council of the City of Baldwin Park at a regular meeting thereof held on May 7, 2025, and that the same was adopted by the following vote to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
_________________________
Christopher Saenz
City Clerk
STAFF REPORT
ITEM NO. _____5_____
TO: Honorable Mayor and Members of the City Council
FROM: Anthony Vazquez, Public Works Manager
PREPARED BY: David Lopez, Associate Engineer
DATE: May 7, 2025
SUBJECT: Request for Appropriation of Funds for Underground Waste Oil Tank Abandonment and Concrete Deck Repair at Clarifier City Yard Facility
SUMMARY
This item seeks City Council consideration for the approval of an appropriation of additional funds in the amount of $45,610.00 for extraordinary repairs to Fleet Service Facility located at Baldwin Park City Yard, 13135 E.
Garvey Ave. and approve all related requisitions in order to initiate repairs. The repairs will include removal of a non-complaint underground waste oil tank and repair to concrete deck of one of the clarifiers at the maintenance facilities.
RECOMMENDATION
It is recommended that the City Council:
1. Authorize the Director of Finance to reappropriate $23,830.00 within Fund #402 – Fleet Services and appropriate $21,780.00 to Fund #245 – Proposition C for FY 2024/2025 to cover a total of $45,610.00 in repair costs; and
2. Authorize the Director of Finance to make necessary budget adjustments to allow payments; and
3. Authorize the Acting Director of Public Works, or his designee, to complete all the proper documentation to process purchase requisition for selected vendors, Premiere Fueling Services Inc. for underground waste oil tank removal in an amount -not-to exceed $23,830.00 and Sager Construction Inc. for surrounding concrete repairs in an amount-not-to exceed $21,780.00.
FISCAL IMPACT
There is no impact on the General Fund. The following table lists the fund(s) available for tank removal services and the concrete repair to deck of clarifier.
* Total amount requested includes 10% contingency for any unforeseen conditions that may arise
BACKGROUND
The City’s Public Works City Yard, located at 13135 Garvey Avenue, was originally constructed as a California Highway Patrol facility in 1962. The City of Baldwin Park occupied the site and added warehouse buildings and a garage in 1978. The Fleet Services Department is located in this garage. Fleet services are comprised of three (3) full-time employees, and they are responsible for the maintenance and repair of over 100 vehicles and pieces of equipment critical to the operations of Public Works, Police, Recreation, and other vital City Departments.
Part of their operations require waste oil storage and a clarifier for maintenance and operations on various pieces of equipment. The waste oil storage tank is underground and has a capacity of 500 gallons. The clarifier is comprised of three (3) separat e settling tanks made from concrete that allow for the separation of solids from a liquid, leaving a clear, clarified liquid.
DISCUSSION
While routine maintenance has been performed regularly, recent inspections by LA County Public Works have identified significant deficiencies requiring immediate attention on both equally important systems. The underground waste oil tank is used to store 500 gallons of used oil when Fleet services perform maintenance on vehicles and equipment. Due to recent requirements by the State and County, the underground facility no longer meets the criteria to remain in service. While preparing for the project to remove the waste oil tank, it was discovered that the portion of the concrete deck that sits ov er the clarifier was breaking apart and creating an unsafe area for vehicles to drive over.
Both projects require immediate action and cannot be delayed any further. Staff began meeting with LA County representatives for recommendations of the next steps. Public Works staff obtained a permit and solicited various qualified vendors to perform the services for removal of underground tank and repair of concrete deck. Based on their experience and cost proposal, We are recommending Premier Fueling Services and Sager Construction Inc. as the two (2) ideal vendors. Below are the additional companies that have submitted proposals for the proposed work:
Removal of Underground Tank Proposal Amount
Premier Fueling Services Inc. $21,663.50
Ocean Blue Environmental $22,503.30
NV-5 $36,572.63
Removal and Replacement of Concrete Deck to Clarifier
Proposal Amount
GM SAGER Construction Co.
$19,800.00
Pedroza Concrete Co.
$24,860.00
EC Concrete Co.
$32,354.00
ALTERNATIVES
1. The City Council may choose not to appropriate the additional funding for the two (2) maintenance projects and instruct staff to seek other quotes. This action is not recommended as soliciting other proposals for this service and purchase may result in increased costs, safety risk, and potential citation for non -compliance by the county
2. Provide Staff with alternate direction.
CEQA REVIEW
PURSUANT TO CEQA, A "PROJECT" IS DEFINED AS A "WHOLE ACTION" SUBJECT TO A PUBLIC AGENCY'S DISCRETIONARY FUNDING OR APPROVAL THAT HAS THE POTENTIAL TO EITHER (1) CAUSE A DIRECT PHYSICAL CHANGE IN THE ENVIRONMENT OR (2) CAUSE A REASONABLY FORESEEABLE INDIREC T PHYSICAL CHANGE IN THE ENVIRONMENT. "PROJECTS" INCLUDE
DISCRETIONARY ACTIVITY BY A PUBLIC AGENCY, A PRIVATE ACTIVITY THAT RECEIVES ANY
PUBLIC FUNDING, OR ACTIVITIES THAT INVOLVE THE PUBLIC AGENCY'S ISSUANCE OF A
DISCRETIONARY APPROVAL AND IS NOT STATUTOR ILY OR CATEGORICALLY EXEMPT FROM CEQA. (PUB. RES. CODE § 21065.) TO THE EXTENT THAT MATTERS, IT HAS BEEN DETERMINED THAT THE ACTION DOES NOT CONSTITUTE A “PROJECT” UNDER CEQA.
LEGAL REVIEW
This report does not require legal review.
ATTACHMENTS
1. Site Plan for Underground Waste Oil Storage Tank
2. Proposals from Selected Vendor for Tank Abandonment: Premiere Fueling Services Inc.
3. Proposals from Selected Vendor for Concrete Deck Repair to Clarifier: G. M. Sager Construction Co.
4. Requisitions for Premiere Fueling Services Inc.
5. Requisitions for G.M. Sager Construction Co.
Vicinity Map
13135 Garvey Ave.
Baldwin Park, CA 91706
Tank Location on
Property
City of Baldwin Park
Department of Public Works
Maintenance Corporation Yard
13135 Garvey Ave.
Baldwin Park, CA 91706
Underground Service Tank
Closure -Site Plan
Rev. Date 2/6/2025 V1098378
25 Feet
APN: 8556-022-904
Top of Tank PCC Slab-
Condition Rate: Good
PREMIERE FUEI.ING SERUICE
262eFoothillBlvd. #302 | T: (81e) 681-81s2
INC'
La Crescenta, CA912j4 | f: (St S) 951_3846
License #929066
January 6,2025
Equipment Rentals:
Backhoe with breaker
Rott off
Materiat:
Pea Gravel up to 6 yards
Concrete
TotaI MateriaI costs:
Labor, permits, soiI samptes, chemist
Sales tax on Materiatg.5%
TotaI Cost:
Terms:
100/o due upon acceptance of quote:
40o/o due upon tank remova[ & soit samples:
Balance due upon comptetion:
City of Batdwin Park
13135 Garvey Ave.
Batdwin Park, CA 91706
Scope of work:
Put[ permit for waste oit tank removat. Breakout tank area; remove waste oit tank and breakout.
Tripte rinse and have chemist certify tank is ok to remove and dispose. Geotogists witt take soitsampte from under tank and provide ctosure report. Backfitt with pea gravet. compact area and concrete.
3,500.00
1,450.00
1 ,150.00
1,550.00
2,700.00
13,757.00
256.50
21,663.50
2,166.35
7,799.96
11,699.29
Accepted by Date
Proposal/Contract
G. M. SAGER CONSTRUCTION CO., INC.
A GENERAL ENGINEERING CONTRACTOR
1380 SOUTH EAST END AVENUE, POMONA CA 91766
(909) 620-9987 ◆ (626) 335-7429 ◆ FAX (909) 620-5288
State Lic. #607796 DIR# 1000010280
No. COBP040925-6
PROPOSAL SUBMITTED TO CONTACT PHONE DATE
CITY OF BALDWIN PARK ANTHONY VASQUEZ (626) 960-3993 04/09/2025
STREET JOB NAME THOMAS GUIDE
13135 GARVEY AVE GARVEY AVE – CATCH BASIN
CITY, STATE ZIP JOB LOCATION
BALDWIN PARK, CA 91706 13135 E. GARVEY AVE, BALDWIN PARK, CA DATE OF PLANS FAX # EMAIL
[email protected]
We propose hereby to furnish material and labor complete in accordance with specifications below for the sum of:
NINETEEN THOUSAND EIGHT HUNDRED DOLLARS AND 00/100. $19,800.00 PAYMENT TO BE AS FOLLOWS: UPON COMPLETION
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from specifications below involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workers' Compensation Insurance.
Authorized Signature
Note: This Proposal may be withdrawn by us if not accepted within
60 Days.
We hereby submit specifications and estimates for:
SCOPE OF WORK
1. SAWCUT AND REMOVE 40 SF OF CONCRETE AT 8” THICK WITH REBAR ON TOP OF CATCH BASIN.
2. FORM AND POUR 40 SF OF CONCRETE AT 8” THICK WITH REBAR AND RECESS (3) 2x2 METAL PLATES ON TOP OF CATCH BASIN.
TOTAL: $19,800.00
Note: Prevailing Wage.
Pricing valid for 60 days.
Exclusions: Petromat Removal, Steel Plates, Permit Fees, Soil Testing, Compaction Testing, Inspection Fees, Irrigation Lines, Surveying, RPM’S, Traffic Loops.
Prices subject to change according to job or special conditions (i.e. unusual traffic conditions, size of job, change in city or county building Code Inspectors requirements, special material, night work.
"NOTICE TO OWNERS"
(section 7018,7019 - Contractors License Law)
Under the Mechanic's Lien Law, any contractor, subcontractor, laborer, material man or other person who helps to improve your property and is not paid for his labor, services or material, has the right to enforce his claim against your property. This means that, after a court hearing, your property could be sold by a court officer and the proceeds of the sale used to satisfy the indebtedness. This can happen even if you have paid your contractor in full, if the subcontractor, laborer or supplier remains unpaid.
Under the law, you may protect yourself against such claims by filing, before commencing such work of improvement, an original contract for the work of improvement or a modification thereof, in the office of the county recorder of the county where the property is situated and requiring that a contractor's payment bond be recorded in such office. Said bond shall be in an amount not less than fifty percent (50%) of the contract price and shall, in addition to any conditions for the performance of the contract, be conditioned for the payment in full of the claims of all persons furnishing labor, services, equipment or materials for the work described in said contract.
Acceptance of Proposal - The above prices,
specifications and conditions are satisfactory and are
hereby accepted. You are authorized to do the work as
specified. Payment will be made as outlined above.
Date of Acceptance Signature
Fax #:
ONE-TIME PROJECT FY 24/25
If yes, please attach proof that the vendor is in good standing and free of suspension and debarment on SAM.gov. x Telephone
X Email
Internet
Other (Please provide explanation):
Name of em
ployee who obtained / received quotes:
Department Head Name (Printed)
Division Head Approval Division Head Name (Printed)
Department Head Approval
Tax:
0.00 Are you using federal funds for this purchase? Yes No
0.00 top of three (3) catch basins.
21,780.00Subtotal:
Replace 40 sf of concrete at 8" thick with rebar and re-install three (3) recess metal plates on x
City Yard Facility. Surrounding concrete is falling apart, creating a safety hazard.
0.00 Selected vendor, G.M. Sager Construction, to perform repair to concrete deck of clarifier at 245-50-551-51101-15510 21,780.00 Total: 21,780.00
Shipping:
0.00 0.00
Project to include:
CITY OF BALDWIN PARK
PURCHASE REQUISITION
Date:
Requisition #:
P.O. #:G.M. Sager Construction Co., Inc.Vendor:05/07/25 Date Required: Order Date:
Vendor #:
Phone #:
1380 South East End Avenue
Pomona, CA 91766
909) 620-9987
Address:
Total AmountUnit PriceItem Qty Unit Account No.Catalog/Item No./Description Anthony Vazquez
(626) 620-9987
(909) 644-1916
(951) 213-5451
Anthony Vazquez
$ 24,860.00
Method:
Francisco
Ricky Pedroza
[email protected]
Purchases of $5,000 or more require three quotes. Please provide the information requested below. Justification required for Sole Source.
Phone # or Web Address:
EC Concrete Co
$ 19,800.00
$ 32,354.00
Quotes:Vendors: Contact Person or Email:
Please provide justification for purchase below:
Concrete deck to clarifier is failing and creating possible emergency repair.
GM Sager Construction Co
Pedroza Concrete Co
Fax #:
ONE-TIME PROJECT _ FY 24-25
If yes, please attach proof that the vendor is in good standing and free of suspension and debarment on SAM.gov. x Telephone
X Email
Internet
Other (Please provide explanation):
Name of em
ployee who obtained / received quotes:
Department Head Name (Printed)
Division Head Approval Division Head Name (Printed)
Department Head Approval
Tax:
0.00 Are you using federal funds for this purchase? Yes No
0.00 soil sampling tocheck for contamination
23,830.00Subtotal:
break out concrete
x
tank from our City Yard facilities. 402.50.590.51101.00000 tank removal 0.00
Selected vendor, Premier Fueling Services, to remove non-compliant underground waste oil 402.50.591.51101.00000 11,915.00 Total: 23,830.00
Shipping:
0.00 11,915.00
0.00 Project will include the following:
CITY OF BALDWIN PARK
PURCHASE REQUISITION
Date:
Requisition #:
P.O. #:Premiere Fueling ServiceVendor:04/28/25
Date Required: Order Date:
Vendor #:
Phone #:
2629 Foothill Blvd, #302
La Crescenta CA. 91214
(818) 681-8192
Address:
Total AmountUnit PriceItem Qty Unit Account No.Catalog/Item No./Description backfill and restore
Anthony Vazquez
(818) 581-8192
(562) 624-4120
(562) 495-5877
Anthony Vazquez
$ 22,503.30
Method:
Gary Crumb
Brandon
Eric Fraske
Purchases of $5,000 or more require three quotes. Please provide the information requested below. Justification required for Sole Source.
Phone # or Web Address:
NV-5
$ 21,663.50
$ 36,572.63
Quotes:Vendors: Contact Person or Email:
Please provide justification for purchase below:
Due to recent requirements by the State and County, the underground facility no longer meets the criteria to remain in service. Tank has been red- tagged and will need to be removed.
Premiere Fueling system
Ocean Blue Environmental
STAFF REPORT
ITEM NO. _____6_____
TO: Honorable Mayor and Members of the City Council
FROM: Enrique C. Zaldivar, Chief Executive Officer
PREPARED BY: Karina Rueda, Human Resources Manager
DATE: May 7, 2025
SUBJECT: Approve and Adopt Resolution No. 2025 -009 Approving the Industrial Disability Retirement (IDR) for William Zendejas a Local Safety Member
SUMMARY
This report requests City Council’s approval and adoption of Resolution No. 2025-009 for an Industrial Disability Retirement for William Zendejas, a Local Safety Member.
RECOMMENDATION
It is recommended that the City Council adopt and approve Resolution No. 2025 -009 entitled , “A
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK, APPROVING THE
INDUSTRIAL DISABILITY RETIREMENT (IDR) FOR WILLIAM ZENDEJAS A LOCAL SAFETY MEMBER”.
FISCAL IMPACT
No fiscal impact.
BACKGROUND
An industrial disability retirement (IDR) is retirement resulting from an employee’s mental or physical incapacity to perform his/her usual job duties as the result of a job-related injury or illness. For local safety employees (e.g. sworn Police Officers) enrolled in the California Public Employees’ Retirement System (CalPERS), state law requires the employer to make a determination on a member’s eligibility for IDR.
In accordance with the California Public Employees Retirement Law (PERL), a local safety employee qualifies for an IDR if he/she 1) is determined, on the basis of competent medical opinion, to be substantially incapacitated from performing the usual and custo mary duties of his/her position, 2) the disability is permanent or of an extended and uncertain duration, and 3) the cause of the injury or illness is industrial, arising out of and in the course of employment.
Mr. Zendejas was hired in April 2004 and held the positions of Police Cadet, Parking Enforcement Officer, Public Safety Trainee, Police Officer, and Police Sergeant. He submitted a request for an Industrial Disability Retirement with CalPERS for a cumulative trauma claim dated May 31, 2007 – August 18, 2022, for orthopedic injuries to the right wrist, left leg, lumbar and cervical, where the Agreed Medical Examiners (AME) found industrial causation. Mr. Zendejas is now permanent and stationary with permanent work restrictions due to the orthopedic industrial injuries.
ALTERNATIVES
The alternative is to deny Mr. Zendejas’ Industrial Disability Retirement.
LEGAL REVIEW
There is no legal review required for this item.
ATTACHMENTS
1. Resolution No. 2025-009
RESOLUTION NO. 2025-009
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN
PARK, APPROVING THE INDUSTRIAL DISABILITY RETIREMENT (IDR)
FOR WILLIAM ZENDEJAS A LOCAL SAFETY MEMBER
WHEREAS, the City of Baldwin Park, (hereinafter, referred to as “Agency”) is a contracting agency of the California Public Employees’ Retirement System (CalPERS); and
WHEREAS, the California Public Employees’ Retirement Law requires that a contracting agency determine whether an employee of such agency, in employment in which he is classified as a local safety member, is disabled for purposes of the California Public Employees’ Retirement Law and whether such disability is “industrial” within the meaning of such law; and
WHEREAS, an application for industrial disability retirement of William Zendejas , employed by the City in the position of Police Sergeant, for orthopedic injuries, has been filed with CalPERS; and
WHEREAS, the City has reviewed the medical and other evidence relevant to such alleged disability; and
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF BALDWIN PARK HEREBY RESOLVES AS FOLLOWS:
(1) Pursuant to the authority delegated to me by action of the City Council of the City of Baldwin Park (hereinafter referred to as Agency) and pursuant to the authority under Government Code section 21173, after review of medical and other evidence relevant thereto, I hereby determine that William Zendejas, a local safety member of the California Public Employees’ Retirement System (CalPERS) employed by the Agency, is incapacitated within the meaning of the California Public Employees’ Retirement Law for performance of his duties in the position of Police Sergeant.
I hereby certify under penalty of perjury that this determination was made on the basis of competent medical opinion and was not used as a substitute for the disciplinary process in accordance with Government Code section 21156(a)(2).
PASSED, APPROVED, and ADOPTED this 7th day of May 2025.
_______________________________
ALEJANDRA AVILA
MAYOR
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES SS:
CITY OF BALDWIN PARK
I, Christopher Saenz , City Clerk of the City of Baldwin Park do hereby certify that the foregoing Resolution No. 2025-009 was duly adopted by the City Council of the City of Baldwin Park at a regular meeting thereof held on May 7, 2025, and that the same was adopted by the following vote to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
CHRISTOPHER SAENZ
CITY CLERK
STAFF REPORT
ITEM NO. _____7_____
TO: Honorable Mayor and Members of the City Council
FROM: Enrique C. Zaldivar, Chief Executive Officer
DATE: May 7, 2025
SUBJECT: Final Feasibility Report for Grade Separation at Ramona Blvd and Metrolink Railroad
SUMMARY
In early 2023, LA Metro pledged a grant of $500,000 to the City of Baldwin Park to conduct a technical feasibility study for a grade separation at Ramona Blvd and the Metrolink railroad. LA Metro has completed the feasibility study and found the grade separation to be technically feasible as a roadway under rail grade separation.
RECOMMENDATION
It is recommended that the City Council
1. Receive and file the Technical Feasibility Report for the Ramona Blvd/Metrolink Railroad Grade Separation, also known as Project Study Report Equivalent (PSRE), attached herein.
2. Acknowledge that the grade separation is technically feasible at an estimate cost of $167.9 million over an eight-year period with 2025 as the base year.
3. Direct Staff to pursue project development partnerships with LA Metro, Metrolink, Caltrans, SGV Council of Governments and others.
4. Direct Staff to pursue funding grants with the county, state, and federal agencies enlisting the support of our elected officials.
5. Thank LA Metro and its project team for undertaking the preparation of the feasibility analysis.
FISCAL IMPACT
LA Metro was the underwriter of the $500,000 used to conduct the feasibility analysis. The development and construction cost of $167.9 million is yet to be determined on how it will be funded.
BACKGROUND/DISCUSSION
In discussions held with LA Metro Chief Executive Officer and her executive team, and facilitated by Councilmember Estrada in early 2023, LA Metro made a commitment to support the City in its efforts to capitalize on the benefits that mass transit offers by the existence of our Cruz Baca Mass Transit Center, with Metrolink and regional bus service already integrated into it.
LA Metro’s support included their pledge of $500,000 to commission the preparation of a technical feasibility study for a grade separation structure at the crossing of Ramona Boulevard and the Metrolink railroad to relieve traffic congestion, safety concerns, and enable unimpeded emergency response. There are six (6) vehicular railroad crossings in the City. None of them have a grade s eparation, and as such traffic and pedestrians stop at all crossings when the train goes by.
Ramona Boulevard is a major east-west corridor for city residents as well as the region. It is also a crucial pathway for our students attending Baldwin Park High School. With the increased commuter train service provided by Metrolink and the freight trains, the railroad crossings are very frequently being activated, causing traffic backups
and pedestrian safety concerns.
LA Metro and their team of consultants determined that the construction of a grade separation is technically feasible, with the roadway under rail as the recommended alternative. In other words, Ramona Boulevard would be lowered to run below the railroad t racks. This is a significant and important finding given the location challenges in both geometry and space availability at the crossing.
There are many subsequent next step that will need to be undertaken, including public engagement, environmental review, securing funding, design, and others. The completion of the feasibility report is a critical first step that will enable the City to pursue partnerships and grant funding with other government agencies.
ALTERNATIVES
None being recommended.
LEGAL REVIEW
Legal review is not required.
ATTACHMENTS
1. Technical Feasibility Report of Grade Separation at Ramona Blvd. Presented by LA Metro
Ramona Boulevard Grade Separation –
Project Study Report Equivalent (PSRE)
Ramona Blvd Grade Separation Feasibility Technical Analysis 2 Project Development Team
3 Other Stakeholders
4 5
LEGEND
Metro ROW
City Redevelopment Project
Prop Class II Bike Lane
Ramona Blvd. Project Study Report Equivalent (PSRE)
Background
6 San Bernardino Line (SBL) is the busiest
in the Metrolink system
44 Metrolink revenue trains (increased
from 38 last year)
4 Union Pacific Railroad (UP) trains
traveled through the corridor every
weekday
Ramona Blvd. is one of the major east-
west highway corridor through the City
Goal / Scope of Work
7 To prepare a Project Study Report Equivalent (PSRE) to grade separate Ramona Blvd. at Metrolink San
Bernardino Line (San Gabriel Subdivision).
Recommend a viable grade separating option to the City. City can use this study to pursuit funding opportunities and materialize this project to environmental clearance,
preliminary and final engineering, and eventual construction phases.
Objectives
8 Improve Safety, Accessibility & Quality of Life
Enhance safety
Improve traffic flow along Ramona Blvd. by
eliminating delays due to train traffic
Prevent pedestrians, cars, trucks, and train
collisions
Key Project Concerns
9 Public Safety
Align with City’s future development plans for the area. Minimize impacts to the community
Minimize right-of-way takes
Minimize displacement of residents/businesses
Maintain Metrolink Service to the community
Maintain access to nearby properties/businesses
Effective Engineering
Grade Separation Alternatives
10 Alternative 1 – Rail over Roadway
Alternative 2 – Rail under Roadway
Alternative 3 – Roadway over Rail
Alternative 4 – Roadway under Rail
Limits of Work for various alternatives
11 Scoring of all 4 alternatives
12 Design Team’s Recommendation
13 Alternative 4 – Roadway under track
Least amount of ROW impacts
No Displacement of residents/businesses
No interruption to the existing railroad and parking lot operation
Access impact to adjacent residences and businesses
kept to minimal.
General Layout Plan
14 General Layout - Profile Concept
15 General Plan of the Future Railroad Bridge
16 Typical Cross Section of the Future Railroad Bridge
17 Typical Cross Section of the Future Ramona Blvd. Underpass 18 Shoofly track & mainline railroad bridge cross section 19 Parcels potentially impacted under Alternative 4
20 Engineer’s rough order of magnitude estimate
21 Engineer’s Projection of Construction Cost Escalation Comparison
22 Project Schedule
23 Step 1
Phase 2
Step 3
ONGOING PUBLIC PARTICIPATION
May 2025
Final PSRE
complete.
March 2025
Final Draft for
City’s review
March 2024
Notice to
proceed
Step 2
Ready for next phase?
Next Phase
24 ONGOING PUBLIC PARTICIPATION
EIR/ Preliminary
Engineering
Advertising/Bid/
Construction
Environmental Clearance/
Preliminary Engineering
Final Engineering
(PS&E)
Advertising/Bidding
Construction
Next Phase
25 EIR/ Preliminary
Engineering
Advertising/Bid/
Construction
26 Questions?
27 Thank you
STAFF REPORT
ITEM NO. _____8_____
TO: Honorable Mayor and Members of the City Council
FROM: Robert Lopez, Chief of Police
DATE: May 7, 2025
SUBJECT: Status and Update on the Apex Officer – Pro Training Simulator
SUMMARY
This report provides an update regarding the status and implementation of the Apex Officer -Pro Training Simulator.
RECOMMENDATION
It is recommended that the City Council receive and file this report.
FISCAL IMPACT
There is no fiscal impact related to this report.
BACKGROUND
In 2021, the City of Baldwin Park entered into a recipient agreement with the Department of Justice, Office of Community Oriented Policing Services (COPS Office) and was awarded $198,817.00 as part of the Community Policing Development (CPD) De -Escalation Training Solicitation grant (15JCOPS -21-GG-02455-SPPS). The Apex Officer Pro Training Simulator was purchased in November 2023, through the DOJ COPS Office grant and there was no cost to the city.
This De -Escalation Training Project authorized the purch ase of the Apex Virtual Reality Training (VRT) simulator for use by the Department to help officers build new de -escalation skills, enhance tactical awareness during incidents, improve officer and citizen safety, and increase community trust and legitimacy surrounding incidents involving high-risk critical incidents.
The Apex CRT Simulator is a comprehensive product designed to allow law enforcement trainers to give presentations and classes, conduct interactive testing and assessment, and provide immersive, hands-on scenario- based exercises with detailed debriefing and after -action reviews. The VRT simulator is designed to increase trainee de -escalation knowledge, skills, and confidence in a safe, yet challenging environment that is highly interactive and engaging. Apex products utilize a state-of-the-art virtual reality head-mounted display that creates the most realistic and immersive judgmental training simulator.
DISCUSSION
The initial implementation of the VRT training was strategically delayed in order to prioritize mandatory California Peace Officer Standards Training (POST) Perishable Skills Program (PSP) training, which was required to be completed by December 31, 2024. The PSP training included five mandatory categories; Tactical Firearms (Category I): four-hour minimum, Driver Training/Awareness (Category II): four-hour minimum, Arrest & Control (Category III): four -hour minimum, Strategic Communications (Category IV): two-hour minimum, and Use of Force (Category V): four-hour minimum.
Upon completion of the required PSP training, the Department implemented supplemental training through PerformaLabs, a mobile application that provided POST - certified perishable skills training consisting of four,
four-hour sessions of De -escalation training (POST ID 1487 -20185) to improve officers' ability to keep themselves and the public safe, four -hours of Mental Illness and Health training (POST ID 1487 -20908) addressing requirements in California Penal Code Se ctions 13515.27, 13515.28, and 13519.2. This strategic approach ensured all officers met the mandatory POST training requirements while receiving additional specialized training before beginning the Apex VRT simulator program.
As previously stated in this report, due to the mandated Peace Officer Standards Training required to be completed by December 31, 2024, coupled with the onboarding of new hires, the completion of mental health and de - escalation training, the utilization of the VRT simulator was del ayed. Due to the unexpected restructuring of Apex Officer, it reinforces the Department’s decision and supports the implementation of PerformaLabs training as a supplemental resource for our officers. The combined POST PSP and PerformaLabs training the Department provided exceeded the minimum requirements required for POST PSP Training.
The VRT simulator is designed to increase an officer’s de-escalation knowledge, skills, and confidence in a safe environment. The Department has the necessary infrastructure to continue to support this training. The grant funding provided for the purchase of all required equipment which included:
o Pro Trainer Simulation Suite with VR training using a simulated handgun and Laser; o High-Performance VR-Ready Workstation;
o Virtual Reality Head Mounted Display;
o Virtual Training Accessories;
o After Action Debriefing capability for real-time monitoring and playback.
The Apex Officer Content Library contains thousands of scenarios that are designed to provide immersive, scenario-based exercises that are realistic and engaging. The scenarios can be edited and modified to address current training trends in addition to a llowing the Department to utilize the variety of pre -established environments and situations our officers might encounter in Baldwin Park or any location. In addition, the VRT simulator is equipped with a Dynamic Scenario Generator which allows our traini ng staff the ability to create additional training situations that mirror real-time situations.
As of April 2025, the VRT simulator was utilized with our seven (7) recently hired officers. Officers Pimentel, Nevels, Larios, Luna, Soto, Eaves, and Cabrera received approximately four hours of training during their Administrative training week (week of April 7, 2025). It should be noted, prior to implementing the use of the VRT, Officers Izzo and Barrios, who are responsible for training our officers, attended training regarding the use of the VRT with the Los Angeles Police Department (LAPD), who also uses the same training simulator.
In regard to the status and support from the Apex Officer company, on January 29, 2025, Apex Officer notified all of their customers that they would be restructuring their company and limiting their offerings and support. The VRT simulator has been update d with the latest software version (2024.5.1) and will continue to function as designed without additional updates.
The original grant funding of $198,817.00, included provisions for Apex Officer to provide hardware setup, software updates, and technical/troubleshooting support. Pending the restructuring of Apex Officer, the company has committed to providing minimal suppo rt, however post -warranty, the Department may face challenges obtaining repairs should major issues arise. To this end, the Department has established contact with GOVRED Technology, Inc., the manufacturer of the VRT simulator for any technical issues or additional support. Given that the LAPD and Rio Hondo Regional Training Center are also users of the VRT simulator, it is anticipated that Apex Officer and GOVRED Technology will continue to provide support for their product.
Beginning with our next shift deployment change, (week of April 27, 2025), Training Bureau will provide all our officers and supervisors with the following:
o Briefing training on the Apex VRT simulator;
o Scenario-based training using the simulator.
Each officer will complete one to two scenarios per shift deployment. Training will continue throughout the remaining three quarters of this year; our consistent training approach will ensure all officers maintain proficiency in de-escalation techniques.
ALTERNATIVES
None.
CEQA REVIEW
None
LEGAL REVIEW
This report does not require review.
ATTACHMENTS
None
STAFF REPORT
ITEM NO. _____10_____
TO: Honorable Mayor and Members of the City Council
FROM: Nick Baldwin, Acting Director of Community Development DATE: May 7, 2025
SUBJECT: Appeal of the Planning Commission’s Decision to approve a Conditional Use Permit to allow a recreational facility (indoor/outdoor soccer facility) use, and a Design Review Application, and finding that the proposed project is
categorically exempt from the California Environmental
Quality Act (CEQA) per State CEQA Guidelines section
15332, Class 32 – Infill Development. (Location: 14412 & 14424 Joanbridge Street; Applicant: Trinidad Campbell; Case
Number: CP 23-05, PR 23-21).
SUMMARY
The applicant, Trinidad Campbell for Fit7 Soccer Facility, applied for an approval of a Conditional Use Permit to allow for the construction of an indoor and outdoor soccer training facility within the Industrial (I) Zone. This request was approved by the Planning Commission on the condition that Planning Staff add several conditions of approval to address neighboring residents’ concerns. The project was appealed by Mrs. Susan Cole, an adjacent property owner, within the appeal period.
RECOMMENDATION
Staff recommends that the City Council:
1. Conduct a public hearing.
2. Adopt Resolution No. 2025-008 DENYING THE APPEAL AND UPHOLDING THE
DECISION OF THE PLANNING COMMISSION OF THE CITY OF BALDWIN
PARK AND APPROVE A CONDITIONAL USE PERMIT TO ALLOW
RECREATIONAL FACILITY (INDOOR/OUTDOOR SOCCER FACILITY) USE, AND A DESIGN REVIEW APPLICATION. (LOCATION: 14412 & 14424 JOANBRIDGE STREET; APPLICANT: TRINIDAD CAMPBELL; CASE
NUMBER: CP 23 -05, PR 23 -21), AND FINDING THE PROPOSED PROJECT IS
CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL
QUALITY ACT (CEQA) PURSUANT TO STATE CEQA GUIDELINES S ECTION 15332.”
FISCAL IMPACT
There is no fiscal impact associated with this action.
APPEAL OVERVIEW
This appeal is submitted to the City Council to challenge the March 26, 2025, approval of Conditional Use Permit CP 23-05 and Design Review PR 23 -21, along with the CEQA Class 32 Categorical Exemption for the proposed 22,800 square-foot recreational soccer facility at 14412 & 14424 Joanbridge Street. The appeal raises the following points:
• Conditional Use Permit Compliance : The proposed project does not comply with key CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
2 zoning requirements, including parking (153.150.040), lot coverage (153.050.030), noise (153.140.070), light/glare (153.140.040), residential privacy (153.210.160), and visual compatibility (153.210.160).
• Site Suitability: The 26,244 square -foot site is too small for the proposed 22,800 square - foot facility.
• Compatibility with Surrounding Land Uses: The proposed soccer facility is incompatible with neighboring residential and industrial properties due to excessive noise, traffic, parking concerns, and light spillover.
• Impact on Utilities and Safety: The project will negatively affect public services, including police and fire, and presents safety risks from errant soccer balls impacting adjacent residential and industrial properties.
• Parking and Access: The facility’s inadequate parking would force overflow parking onto prohibited areas and nearby residential streets.
• General Plan Consistency : The project is inconsistent with the City’s General Plan, including Land Use Policies related to commercial components, land use intensity, lighting, and parking.
• Design Review Non-Compliance: The design does not meet required standards, including noise, parking, light/glare, setbacks, and residential privacy protections. • CEQA Compliance: The CEQA Class 32 Categorical Exemption is inappropriate due to the project's inconsistency with the General Plan and Municipal Code, resulting in significant environmental impacts, particularly in traffic, parking, and noise.
APPEAL STANDARD OF REVIEW
In accordance with Baldwin Park Municipal Code ( BPMC) Section 153.210.150, the City Council will review the appeal de novo, meaning it will consider the matter anew, without deferring to the Planning Commission’s prior decision. The Council may reverse, modify, or affirm the decision based on the evidence presented during the hearing. Additionally, the City Council has the discretion to add, delete, or modify conditions as necessary, or refer the matter back to the Planning Commission for further consideration.
SUBJECT PROPERTY & SURROUNDING LAND USES
The project site consists of two separate legal lots of record, Parcel 1 – (14412 Joanbridge Street) and Parcel 2- (14424 Joanbridge Street) that are each approximately 13,122-square feet for a combined total of 26,244 square feet. Parcel 1 is currently equipped with an existing approximately 6,813-square foot commercial building, while Parcel 2 is developed with a 5,000-square foot commercial building.
The s ubject property ’s General Plan land use designation is General Industrial , which is consistent with the property’s I, Industrial Zone. The subject sites total approximately 26, 244 -square feet and are both rectangular in shape.
The sites are bounded by the uses as detailed in Table #1 below.
TABLE #1
ADJACENT ZONING & LAND USE
ADJACENT PROPERTY
LOCATION ZONING PROPERTY USE
North Industrial (I) Industrial Complex
East Industrial (I) Auto/Industrial Complex
South R-1 Single Family Residences
West Industrial (I) Headstone Manufacturing
CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
3 DISCUSSION
On March 26, 2025, the Planning Commission considered and approved the Conditional Use Permit and Design Review at a duly noticed public hearing during their regular meeting and at which time they considered the staff report and attachments presented by Planning Staff as well as written documentation and verbal testimony from the applicant, appellant, and other commenting parties. The Planning Commission added or modified proposed conditions to address concerns and issues raised at the public hearing, whic h have been included in staff’s recommendation and are further described below.
An appeal application of the Planning Commission’s decision was submitted by Appellant to the City within the appeal period.
PROJECT DESCRIPTION
The applicant is requested approval of a Conditional Use Permit to allow for a recreational facility (indoor/outdoor soccer facility) within an existing commercial complex. Recreational facilities are permitted in the Industrial zone by way of a reviewed and approved Conditional Use Permit by the Planning Commission.
The proposal includes a complete interior remodel of the existing unit on Parcel 1 and the demolition of the existing building on Parcel 2. The proposed ground floor layout will consist of one (1) new indoor ground level soccer field of 3,825-square feet in size, a meeting room, men and women restrooms, and a gym room within the remodeled building. A 39-stall parking structure will be built surrounding the building which will include a trash enclosure, additional men and women restrooms, and staircases and an elevator to access the second floor. The second floor of the remodeled building will include a meeting room, four (4) offices, a kitchen, restroom, and one (1) practice area of 1,707 square feet in size. The second floor above the parking area will have three (3) outdoor soccer fields on the second floor ranging from 3,410-square feet to 3,770-square feet.
Zoning
The existing industrial commercial building is currently 25 -feet in height measured from finished grade to the highest point of the roof. The proposed parking area and outdoor soccer fields will measure the same height as the existing building, a total of 25 feet measured from finished grade to the highest point of the protective mesh wiring on the second floor. The allowed maximum height in the Industrial (I) zone is 25 feet, making the building height compliant with code standards.
The proposed project is in compliance with all other development standards pursuant to 153.220.130 - including Lot Coverage: The percentage of the total lot area covered by enclosed structures and/or carports, but excluding uncovered steps, driveways, walks, covered patios, terraces and swimming po ols. The subject project does not propose any new enclosed structures on the first floor. The maximum Floor Area Ratio ( FAR) for Industrial properties is 1.0. Since FAR only applies to enclosed structures, only the existing building is counted and the project has an FAR of .52, which is below the maximum permitted.
Design Review
Pursuant to Section 153.210.160, the design review process is intended to improve the general standards and orderly development of the city through review of the design, layout and other features of proposed developments and their environs prior to submission of plans to the Building Division for plan check. The primary objective of the Design Guidelines is to provide for functional site planning, integrate architectural elements within a project and within streetscapes, protect privacy and ensure the provision of high-quality projects.
CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
4 Staff has determined that the project comports with the primary objective of the Design Guidelines. Exterior improvements shall include a combination of Ash wood siding and decorative black wire mesh screening along the primary building façade. Pedestrian scale architectural light fixtures will be provided along with a wall sign that will be considered under a separate permit. The west elevation will be finished with subdued earth tone stucco and the other side and rear elevations will be painted to matc h. The decorative wire mesh screening featured at the top of the primary level will continue along the other three elevations to conceal the soccer fields.
Netting will be used in between the soccer courts, but the netting will not be visible from the public right-of-way or adjacent properties, ensuring privacy for residential neighbors . As a condition of approval, the applicant will also be required to install mature trees and plants to soften the south elevation and created an additional barrier between current residential properties abutting the soccer facility.
Business Operations Plan and Hours of Operation
The applicant has indicated that the soccer training facility will be open to students aged 5 to 17 and will operate seven (7) days a week, with a total of 3 classes per field held throughout a given day. The training schedule will be Monday-Friday from 4PM -9:30 PM. Class times will be broken up from 4PM -6PM, 6PM-8PM, and 8PM - 9:30PM on fields 1-5. Saturday from 8AM-6PM. Class times will be divided from 9AM -11:30AM, 1PM-3PM, 4PM-6PM on fields 1-5. Sunday from 8AM-2PM. Class times will be divided from 8AM-10AM, 10AM-12PM, 12PM-2PM on fields 1-5. All class sizes will range from 2-8 players per field with 2-3 staff per class.
Conditions have been included in the Planning Commission Resolution (Attachment # 2) to address issues that could have an impact on surrounding businesses and residents . These include restrictions on the maximum number of students present for instruction during any given time and property maintenance standards to limit and deter graffiti on exterior walls.
Parking and Traffic
BPMC Section 153.150.040 provides that t he number of parking spaces required for land uses not specifically listed in Table 153.150.040 is to be determined by the City Planner based on common functional, product or compatibility characteristics and activities. The proposed hybrid educational-commercial use on the facility is not identified in Table 153.150.040. As such, staff determined that the proposed use’s parking requirements are most comparable to the parking requirements of a school. Staff points to precedent in this interpretation of the Zoning Code, such as in Case No. CP 23-06, where a recreational facility used as a swim school was also required to provide the same parking spaces as a school, as opposed to the amount of parking spaces required by a commercial recreation fitness club.
The required parking for a recreational facility is one parking space for every employee present at the facility and one additional parking space for every classroom. In this instance, the proposed use requires a total of thirteen (13) parking spaces, as there are always a total of eight (8) instructors during all hours of operation and one combined classroom in the form of the proposed soccer field (5 field). Therefore, the required number of on-site parking spaces required for the proposed soccer facility is thirteen (13) parking spaces per BPMC Section 153.150.040. The project is proposing approximately thirty-nine (39) parking spaces within its parcel boundaries.
Although the minimum parking required is thirteen (13) parking spaces for the proposed use, based on the applicants proposed practice schedule there will be approximately 26-29 possible vehicles based on students/parents, and staff on duty on the site at any one time making the thirty-nine (39) parking spaces sufficient for the proposed use. The soccer training facility will not allow walk-ins and all players will be required to register for classes. Given the age of the participants of the program, Staff anticipates that nearly all will be picked up and dropped off by parents rather than driving themselves to the facility. It is Staff’s assessment that the proposed CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
5 application meets the minimum required off -street parking requirements as required in Section 153.150.040 of the City’s Municipal Code.
A traffic analysis was prepared by Kittleson & Associates—a professional traffic engineering firm—to determine if this project would result in traffic impacts. (See Appendix C of Attachment #11.) After an analysis of site and project characteristics, it was determined that the project would result in 85 net new vehicle trips, which is below the screening threshold of 110 trips, and therefore the project would not have a significant impact on traffic. Out of an abundance of caution, a condition of approval has been added to require the applicant to prepare a circulation and access plan to prevent queuing and idling on Joanbridge Street proximate to the Project. Conditions have been included in the Planning Commission Resolution (Attachment #2) to address potential parking issues.
Noise
The Project includes four outdoor soccer fields on the rooftop of the proposed parking garage (second level). The soccer fields would introduce new sources of noise from people playing soccer, people talking/coaching/cheering, and other related activities. The Applicant has confirmed no whistles, buzzers, or horns will be used to reg ulate activities and no amplified music or public address systems will be operated. The primary soccer activities would include training young kids in small groups and would consist of practice, skill-related drills, endurance training, and soccer fundamentals.
In order to assess the Project’s noise compatibility with the Project area, a noise survey and measurement were conducted at SOFIVE Soccer Center located at 699 S. Barranca Avenue in Covina, which is approximately 5 miles southeast of the Project Site. (See Appendix B of Attachment # 11.) This location was selected as a representative noise source because of its urban location and its operational characteristics are similar to the Project. This facility includes 10 soccer fields of similar size as proposed b y the Project. The noise meter was placed near three fields that were being used during the survey. Activities observed during the survey included a six-player scrimmage with cheering and instructing at the nearest field (approximately 10 feet from noise meter), a five-player practice with cheering and instructing at an adjacent field (approximately 30 feet from the noise meter), and one-on-one drills with cheering and instructing on a third field (approximately 50 feet from the noise meter). These activiti es are representative of the proposed conditions at the Project Site and also reflect comparable setback distances from the properties to the south of the Project Site. Amplified music and whistles were also observed during the measurement. It is noted that because the Project does not include amplified music or whistles, this reference noise level is conservative and is likely an overestimate of the noise anticipated for the Project. The measured noise level during these activities was recorded at 59.1 dBA Leq (see Appendix B.2 for noise monitoring data). It is noted that the noise meter was placed adjacent to the nearest field, and only a chain- link fence was between the meter and noise sources. Thus, no substantive noise -attenuating barriers affected the reference measurement. Based on a review of the Project’s plan set and confirmation with the Project Applicant, all off-site properties, including the residential uses to the south of the Project Site, would be shielded from Project soccer activities by a 6-foot-high padded wall proposed for the entire perimeter of the second level soccer fields.
According to the Project Applicant, the padding would be a minimum of three inches thick and would be insulated with Rockwool AFB which is specifically designed for sound absorption. This material can achieve a sound transmission class (STC) rating of approximately 44 to 56, which means the material has the potential to reduce noise transmission by approximately 44-56 decibels. According to the FHWA Noise Barrier Design Handbook, the design feasibility of a sound barrier that reduces noise by 10 dBA is considered “attainable.” Therefore, while the data suggests that noise attenuation from this barrier may be greater than 10 dBA, it is reasonable to conservatively assume the padded wall would reduce soccer related noise by 10 decibels at all off-site locations, including the prop erties to the south of the Project Site. With this reduction, soccer related noise levels at the properties to the south of the Project Site would be approximately 49.1 dBA Leq, which is below the allowable CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
6 exterior daytime (7 AM -7 PM) and evening (7 PM -9:30 PM) noise standards for residential zones. The Project would not be operational during nighttime hours (10 PM – 7 AM) and would have no potential to conflict with nighttime standards. As such, the Project would be consistent with the City’s exterior noise standards and impacts would be less than significant. Below are Noise limits from the Baldwin Park Municipal code section 153.140.070.
Light and Glare
The applicant has provided a photometric plan as part of the architectural plan set that is compliant with the Baldwin Park Municipal Code light and glare standards. The applicant is proposing twenty (20) sets of exterior light fixtures at the second-floor soccer fields that will be installed at a maximum height of 12 feet above the first- floor roof line. The proposed lighting will be sufficient to light the fields at night, but will result in no spill over into the adjacent residential properties due to the low light fixture height and the padding of the perimeter fencing (see photometric sheets of the architectural plans, pages 11-17).
The primary light sources associated with the Project would include vehicle headlights emitted from the ground floor, soccer field lighting, and general lighting for common areas, pedestrian access, parking, and security. There is an existing six -foot-high masonry concrete wall between the proposed facility and adjacent residential uses south of the site. The proposed existing masonry wall would shield the adjacent residential uses from direct exposure to vehicle headlights. However, due to the height of the proposed existing masonry wall and its location on the ground floor, exterior light emitted from the second floor of the soccer training facility could spillover and affect existing sensitive receptors (i.e., residential uses) that are adjacent to the Project Site if not addressed. The Project would comply with Section 153.140.040 (Light and Glare) (a) of the City’s Municipal Code, which limits the height of all lighting support structures to the maximum permitted building height for the zone in which they are located. Additionally, Section 153.140.040(f) requires all outdoor lighting to be directed, oriented, and shielded to prevent light from spilling over into adjacent properties. The Project Applicant would also adhere to City to Baldwin Park Design Guidelines Manual (April 2012) and submit a Schematic Lighting Plan of the Project Site as part of the Applicant’s Design Review Submittal package to the City of Baldwin Park Planning Division for review and approval. As required, the schematic lighting plan would indicate the location of all proposed
CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
7 exterior light fixtures (i.e., lighting poles and mounted lighting fixtures). The 6’-0’-tall padding attached to the perimeter fencing would also serve to block light from spilling over to adjacent properties. Per the City’s Guidelines, all exterior lighting fixtures would be energy -efficient ENERGY STAR and have photosensitive off/on switches. Furthermore, a condition of approval has been added to require the Project Applicant to demonstrate that the proposed lighting conditions would not result in exces sive spillage into the adjacent residential uses. Thus, adherence to local lighting regulations, implementation of the City’s Design Guidelines, and implementation of the lighting condition of approval would reduce the Project’s impacts involving substantial light and glare to less than significant levels.
Reviewed for Safety
The proposed project has been reviewed by the City’s Planning, Building and Safety, Public Works, and Los Angeles County Fire departments (LACFD) and note that the Project would not substantially increase hazards due to an incompatible use with the implementation of this project. The project construction will also occur above grade and there is no expectation that any below grade trunk lines would be impacted by the Project. If any utility lines need to be altered in any way, such activity would be subject to review and approval with the City’s Department of Public Works.
The project applicant must also submit plans for plan check review to the City of Baldwin Park City Engineer and the LACFD to confirm that the Project would provide adequate on -site access to emergency services and must incorporate all applicable design an d safety standards and regulations outlined in Chapter 33 of the 2022 California Building Code, and Chapter 11 (Construction Requirements for Existing Buildings) of the California Fire Code.
Community Benefit
The Project will be a private facility and while it would not be open to the public for free, the Project would nonetheless provide a new recreational facility that is available to residents so that they do not need to travel outside of the City. The City encourages a variety of recreational uses to support the wide variety and interest of residents. The facility would provide an opportunity for young children to play and learn sports, and therefore would serve the community as a recreational use. In addit ion, it would attract families from neighboring communities to the City, which could generate support for local businesses and help boost economic activity locally.
Future Lot Merger Required
Since the project site consists of two separate lots, the applicant will be required to submit a Lot Merger application through the Public Works Department to consolidate the two lots to allow for the construction of the development and this requirement has been added as a condition of approval.
Lot Coverage
The proposed Project incorporates an innovative layout in which open -air soccer fields are located on a raised platform above ground -floor parking, rather than enclosed or roofed. Because these fields do not meet the Municipal Code’s definition of a “structure”, which requires a roo f supported by walls or columns, and are not used to shelter, house, or enclose persons or property, they are not treated as “enclosed” for purposes of calculating lot coverage or considered a second story for setback purposes. T his distinction aligns with the Municipal Code requirements that only enclosed structures or carports be counted toward lot coverage; in this instance, the Project’s carports, buildings, or other enclosed spaces are limited to the existing industrial building, which results CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
8 in a total lot coverage of approximately 26 percent, well below the 50 percent maximum allowed by the Industrial Zone. In addition, the Floor Area Ratio (FAR) of the existing enclosed spaces is 0.52, also below the maximum
0.75 permitted for industrial properties.
Similarly, although BPMC section 153.050.030(A)(2) requires an increased rear yard setback where a commercially or industrially zoned lot shares a property line with a residential zone and a proposed building exceeds one story, the open-air fields above the parking platform do not qualify as a building or structure because they have no roof and do not enclose space. Therefore, the requirement to double the rear yard setback for a two- story building does not apply . The proposed Project proposes a 10 -foot rear setback that complies with the standard one -story setback requirement in the I -Zone. Notably, several properties on Joanbridge Street share similar rear setbacks, including one at zero feet to residential to the south, which supports that a 10 -foot rear setback is consistent with existing development patterns in the area.
Public Comments
Public comments submitted by the appellant and the applicant have been received and were taken into account during the preparation of this report. Comments are attached to this staff report. See Attachment 13.
GENERAL PLAN CONSISTENCY
The project site is designated as “General Commercial” in the City of Baldwin Park General Plan. The proposed project is consistent with the following General Plan goals and policies.
Land Use Goal 1.0 Balanced Development in Baldwin Park. Maintain a balanced mix and distribution of land uses throughout Baldwin Park.
Land Use Policy 1.4 Create opportunities for two different levels of commercial development: (1) commercial uses that meet the retail and service needs of the local residents and employee populations, and (2) regional - serving retail commercial businesses that capture revenues from a broader population base.
FINDINGS OF FACT— CONDITIONAL USE PERMIT
1. Conditionally permitted: The use is conditionally permitted within the subject zone and complies with the intent of all applicable provisions of this chapter
The use is conditionally permitted within the subject zone and complies with the intent of all applicable provisions of the Municipal Code. The Project is located in the Industrial (“I”) Zone. The I Zone provides areas for the development of industries engaged in general assembly, manufacturing and processing, and support commercial uses. Section 153.050.020 of the Municipal Code conditionally permits recreational facilities (soccer facility) in the I Zone with an approval by the City’s Planning Commission. The Project complies with the intent of all applicable provisions of the Municipal Code because the I Zone was established to meet the commerce and service needs of the resident and business communities in the City, as stated in Section 153.050.0100 of the Municipal Code. The Project will provide service-oriented uses that serve both local residents and businesses, because it will offer recreation opportunities to residents and nearby employees. Furthermore, the Project will occupy a large tenant space that is currently vacant, further promoting commercial activity in the I Zone, as intended by the Municipal Code.
2. Zone integrity and character: The use will not impair the integrity and character of the zone in which it is to be located
The use will not impair the integrity and character of the zone in which it is to be located. The Project CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
9 is located within the I Zone, which allows for uses that provide a broad range of retail, office, and service-oriented commercial uses designed to meet the needs of both the local and residential and business communities. The Project is substantially comp arable to existing uses in the I Zone. The Project promotes the integrity and character of the I Zone because the Project will occupy a large tenant space that is currently vacant, which will activate a long-vacant tenant space with a low-impact recreational use that draws visitors primarily on evenings and weekends, complementing the industrial uses during off -peak hours.. Therefore, an indoor/outdoor soccer training facility at the subject location compliments the integrity and character of the zone.
3. Site Suitability: The subject site is physically suitable for the type of land use being proposed
The subject site is physically suitable for the type of land use being proposed. The onsite circulation has been reviewed and approved by the Los Angeles County Fire Department, confirming that it meets applicable functionality and safety standards. Traffic and circulation associated with the Project were also analyzed by a qualified traffic engineer as part of the Categorical Exemption Report, which concluded that the project would not result in any significant impacts. The Project provides 39 on-site parking spaces, which exceeds both the minimum required by the Municipal Code and the anticipated demand, as determined through review of the Applicant’s business plan. To further address parking and circulation concerns, a condition of approval has been inc luded requiring the applicant to submit a plan to manage onsite queuing and vehicle idling, in order to prevent offsite impacts. With respect to neighborhood compatibility, the proposed fields and parking area incorporate architectural and site planning f eatures that promote visual integration with the surrounding area. Decorative black screening and fencing will wrap the fields and parking area. While consistent with other industrial properties on the block that also employ fencing, the proposed fencing is enhanced through higher - quality materials and improved design. Decorative wood siding will be installed on the building’s front elevation, consistent with newer industrial developments that aim to exceed the utilitarian appearance typical of the older i ndustrial buildings in the area, most of which were constructed more than five decades ago. The proposed soccer fields are located 10 feet from the rear property line, consistent with the setback requirement for one-story structures in the I Zone. Notably, four other properties on the south side of the block also maintain setbacks at or near this distance. Finally, the Project includes new tree plantings along the southern property line to soften the visual transition between the recreational use and adjacent residential properties.
4. Existing compatibility: The use is compatible with any land uses presently on the subject property
The use is compatible with any land uses presently on the subject property. The subject site’s buildings are currently vacant and not being utilized by tenants. The subject property neighbors a headstone manufacturer, three auto body shops, and an aircraft parts manufacturer to the east and west; a community service office, a fleet services office, a construction office to the north; and single -family residences that front on California Avenue to the south. The neighboring facilities operate mostly on week-days and peak business hours. The proposed recreational facility is anticipated to generate business outside of peak business hours and on the weekends. The Project is compatible with land use on the subject property because it provides a complementary service to customers that are visiting the existing neighboring facilities. The use is also compatible with the industrial land uses adjacent and in proximity to the subject site.
5. Future compatibility: The use will be compatible with existing and future land uses within the zone and the general area in which the proposed use is to be located
CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
10 The use will be compatible with existing and future land uses within the zone and the general area in which the proposed use is to be located. Because this recreational use is low -impact, primarily occurs during non-business hours, and will not generate noise or traffic incompatible with industrial operations, it will not preclude future development of surrounding properties consistent with the General Plan.
Further, future uses with potential impacts typically require approval of a Conditional Use Permit and therefore would be before the Planning Commission for consideration of the cumulative impacts for the area.
6. Utilities and services: Adequate provisions for water, sewer and public utilities and services are available to ensure that the use will not be detrimental to public health and safety
Adequate provisions for water, sewer and public utilities and services are available to ensure that the use will not be detrimental to public health and safety. The existing industrial building provides all utilities and services connected and therefore the proposed recreational facility will not be detrimental to public health and safety. Further, the Public Works Conditions of Approval require the submission of a utility plan for City review of existing and proposed future utilities .
7. Public Access: Adequate provisions for public access are available to serve the use
Adequate provisions for public access are available to serve the use. The site has direct vehicular and pedestrian access to Joanbridge Street which is designated as a local street in the City’s General Plan; however, the facility is proximate to Maine Street, which is the predominate way residents will access the facility and this is a collector street with a large traffic volume capacity. The site’s access to streets and highways are adequate in width and pavement type to carry the quantity of traffic ge nerated by the proposed recreational facility. The site includes adequate internal circulation and pedestrian safety features as shown through the approval of the plan by the stamp of approval from Los Angeles County Fire and by condition of approval (ff) for construction plan review through Building Plan Check.
8. General Plan consistency: The use is consistent with the General Plan
The use is consistent with the General Plan. The Project is consistent with Land Use Goal 1.0 Balanced Development in Baldwin Park, which proposes a balanced mix and distribution of land uses throughout Baldwin Park. The Project brings to the I Zone a unique but compatible type of commercial activity with recreational soccer activity. The Project also complies with Land Use Policy 1.4, which is to create opportunities for two different levels of commercial development: (1) commercial uses that meet the retail and service needs of the local residents and employee populations, and (2) regional -serving retail commercial businesses that capture revenues from a broader population base. The Project will serve the needs of local youth, drawing from the surrounding residential areas and businesses.
9. Safety and welfare: The use will not be detrimental to the public interest, health, safety, convenience or welfare
The use will not be detrimental to the public interest, health, safety, convenience or welfare. Parking is adequate for the proposed use. The facility will operate in accordance with all applicable health and safety regulations, including occupancy limits , noise restrictions, and security measures, which aree conditions of approval. Further, the active recreational use promotes healthy lifestyles for the City’s youth, which supports the general welfare.
CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
11 PLANNING COMMISSION DECISION
As noted above, on March 26, 2025, the Planning Commission considered this application at public hearing during their regular meeting and at which time they considered the staff report and attachments presented by Planning Staff as well as written documentation and verbal testimony from the applicant, appellant, and other commenting parties.
During the course of the meeting the Planning Commission focused on some key points of the project related to hours of operation, lighting, use limitation, and parking and ultimately directed Planning Staff to amend the conditions of approval of the resolution to incorporate changes intended to prevent adverse impacts to the neighborhood. The edits have been incorporated into the resolution before the City Council and are as follows:
Condition No. New or Revised Language Explanation
(d) Condition added to specify age restriction. The condition reads, “Training shall be limited to individuals between the ages of 5 to 17 years; and”
(e) Condition added to clarify that the onsite parking is for the soccer use only. It reads, “The business shall erect signage that restricts parking to patrons, their parents/guardians, and employees; and”
(i) Condition added to address concerns that the use could expand or deviate from the stated business plan. The condition reads, “The facility purposes will remain for training only and will limit uses to what is stated in the Business Plan; and” (l) Condition revised to clarify the relationship between a lighting restriction and business operations. The condition reads, “All exterior field lights for the business must be off by 10:00 PM, and training programs must stop by 9:30 PM and operations must stop by 10:00 PM.
In addition to the topics of hours of operation, lighting, use limitation, and parking, the Planning Commission inquired whether an environmental analysis had been performed to evaluate the impact the environment from the proposed use. Staff indicated that that type of analysis had not been performed as it is not required per CEQA , as explained below.
After considering all the information presented, the Planning Commission voted to approve the project with three votes to approve, one vote to deny, and one vote to abstain.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)/NOTICING
This project was previously presented at Planning Commission on December 13, 2023 and February 14, 2024 and at those meetings the project entitlements (including a Variance request) were accompanied by an Initial Study/Mitigated Negative Declaration. The project has been revised since that time to increase the rear setback and as a result, the Variance request has been eliminated. Without a Variance request, this project now is categorically exempt from further CEQA review under the State CEQA Guidelines section 15332, Class 32, In- Fill Development Projects. A memorandum supporting the City’s reliance on the Class 32 exemption, along with technical studies analyzing air quality, no ise, transportation, and water quality, has been reviewed and accepted by the City, a copy of which is attached to this report as Attachment #11.
The proposed Project is categorically exempt from CEQA per the Class 32 (In-Fill Development Projects) set forth in State CEQA Guidelines section 15332 for the following reasons:
1. The Project constitutes in-fill development;
CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
12 2. The Project is consistent with the applicable general plan designation and all applicable general plan policies as well as with all applicable zoning designations and regulations; the Project is consistent with the General Industrial land use designation set forth in the City’s General Plan and the Industrial zoning designation set forth in the City’s Zoning Ordinance. Indoor and outdoor recreational facilities are an acceptable use under both the General Industrial land use designation and Industrial zoning designation.
3. The Project occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. The Project is located entirely within the City of Baldwin Park, consists of approximately 0.60 acres, and is located in an urban se tting bounded by industrial uses to the west and east, single -family residential uses to the south, and industrial uses to the north.
4. The Project site is fully developed and located in a developed, urban area, surrounded by commercial, industrial, and residential uses. Because of these conditions, the Project site does not provide any suitable habitat for endangered, rare, or threatened species.
5. Approval of the Project would not result in any significant effects relating to traffic, noise, air quality, or water quality; analysis has been conducted to ensure the Project does not result in any significant effects relating to traffic, noise, air qual ity, and water quality, including the following: Air Quality Impact Analysis, Noise Impact Analysis, Transportation Vehicle Miles Traveled Screening Memorandum, and Water Quality Technical Report, all of which were reviewed and accepted by the City. (See Attachment 14.)
6. The site can be adequately served by all required utilities and public services; the Project site is currently serviced by all required utilities, including but not limited to electricity, natural gas, water, wastewater, solid waste generation, fire protection, police protection, schools, recreation and parks, and libraries and therefore will remain adequately serviced.
In addition, none of the exceptions to the categorical exemption as set forth in State CEQA Guidelines section 15300.2 applies:
1. There is no possibility of a cumulative impact of the same type of project in the same place over time. The Project proposes to develop a recreational facility. There is no foreseeable successive project at this site and there is no possibility of a cumula tive impact from this same type of project in this area over time. There are no planned development project areas located within a 0.5 -mile radius of the Project site. The Project is also consistent with planning and zoning designations for the site and will be consistent with local and regional planning documents. Thus, for these reasons, the Project will not have the potential to contribute to a local or regional significant cumulative impact.
CP 23-05 and PR 23-21
14412 & 14424 Joanbridge St
13 2. The Project is not marked by unusual circumstances that would create a reasonable possibility of significant effects on the environment. There is nothing unusual about the development of a recreational facility that is zoned for this type of use with a conditional use permit. The site is surrounded by industrial, commercial and residential uses and the Project will serve as a recreational facility for residents within the Project area.
3. The Project site is not located within, or visible from, a State Scenic Highway, and the Project will thus not result in damage to scenic resources, within a state scenic highway.
4. The Project site is not located on a site that is included on any list compiled pursuant to Government Code section 65962.5.
5. Finally, the Project would not cause a substantial adverse change in the significance of a historical resource.
Based on the performed studies and analysis contained within Attachment 14, the Project is categorically exempt from CEQA pursuant to the Class 32 exemption, and no further environmental review is required. If the Project is approved, a Notice of Exemption will be filed with the County Clerk’s Office and State Clearinghouse with in 5 working days of such approval.
NOTICE OF APPEAL
On April 24, 2025, legal notice for the appeal of the project to the City Council was published in the Baldwin Park Press and mailed to the property owners and occupants within a 300-foot radius of the subject property. The appeal notice was posted at City Hall on April 25, 2025.
LEGAL REVIEW
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS
1. City Council Appeal Resolution Upholding Decision – Resolution No. 2025-008
2. Planning Commission Resolution of Approval- PC 23-28
3. Architectural Plans
4. Business Plan Narrative
5. Parking Ratios
6. Letter of Concern 12/12/23 and 02/01/24
7. Public Comments Received from Susan Cole on March 20, 2025
8. Public Comments and Exhibits received on March 26, 2025
9. Public Comment Summary Received from Susan Cole on March 27, 2024
10. Additional Documents received from Susan Cole received April 29, 2025
11. Public Comments received from Sheima Berenji received April 30, 2025
12. Correspondence from Applicant’s Legal Counsel
13. Vicinity Map
14. Class 32 Categorical Exemption Report (including Appendices A through D)
15. Appeal Application and Statement
RESOLUTION NO. 2025-008
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BALDWIN
PARK DENYING THE APPEAL AND UPHOLDING THE DECISION OF
THE PLANNING COMMISSION OF THE CITY OF BALDWIN PARK
APPROVING A CONDITIONAL USE PERMIT TO ALLOW
RECREATIONAL FACILITY (INDOOR/OUTDOOR SOCCER FACILITY)
USE, AND A DESIGN REVIEW APPLICATION. (LOCATION: 14412 & 14424 JOANBRIDGE STREET; APPLICANT: TRINIDAD CAMPBELL; CASE NUMBER: CP 23 -05, PR 23 -21), AND FINDING THE
PROPOSED PROJECT IS CATEGORICALLY EXEMPT FROM THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT
TO STATE CEQA GUIDELINES SECTION 15332.
THE CITY COUNCIL OF THE CITY OF BALDWIN PARK DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The City Council of the City of Baldwin Park does hereby find, determine, and declare as follows:
(a) An application for a conditional use permit (“Application”) was submitted on behalf of the owner of cert ain real properties, located at 14412 & 14424 Joanbridge Street in the City of Baldwin Park, described more particularly in the Application s on file with the City Planner; and
(b) The Application sought to approve a Conditional Use Permit to allow a recreational facility (the “Project”) according to pursuant to the City’s Industrial Zone and Municipal Code; and
(c) Pursuant to Section 21067 of the Public Resources Code, and Section 15367 of the California Environmental Quality Act (“CEQA”) Guidelines (Cal. Code Regs., tit. 14, § 15000 et seq.), the City of Baldwin Park is the lead agency for the proposed Project; and
(d) The City of Baldwin Park has determined that the Project is categorically exempt from CEQA pursuant to State CEQA Guidelines, section 15332 – In-Fill Development Projects (Class 32); and
(e) A duly noticed public hearing was held on March 26, 2025 , to consider said Application by the Planning Commission, and based upon evidence presented including applicable staff reports and each member of the Commission being familiar with the property, it was determined that the facts as required by the Baldwin Park Municipal Code for the granting of such Application are present and that the Conditional Use Permit should be approved subject to the terms of this Resolution with certain edits and additions made to the conditions of approval as specified during the public hearing and approved the project; and
(f) Each fact set forth in the staff report dated March 26, 2025 , from Nick Baldwin, Acting Community Development Director/City Planner to the Chair and Planning Commissioners (“Staff Report”) is true and correct.
May 7, 2025
(g) On April 3, 2025, a member of the public submitted a complete and timely appeal of the Planning Commission’s decision to the City Clerk of the City of Baldwin Park; and
(h) A duly noticed public hearing was held on said appeal by the City Council on May 7, 2025 . The City Council, after reviewing the Staff Report, Administrative Record, Appeal, and considering oral and written testimony during said public hearing, found that there are requisite findings to uphold the decision by the Planning Commission, and approve the conditional use permit and design review applications.
SECTION 2. Based upon the evidence presented, the City Council hereby finds and determines as follows:
1. Each fact set forth in the recitals above is true and correct.
2. Each fact set forth in the Staff Report for Agenda Item Number [X], for the City Council Meeting dated May 7, 2025, from planning staff, presented to the City Council on said date, is true and correct
SECTION 3. The City Council does hereby find that the proposed Project is categorically exempt from CEQA per the Class 32 (In -Fill Development Projects) set forth in State CEQA Guidelines section 15332 for the following reasons:
1. The Project constitutes in-fill development;
2. The Project is consistent with the applicable General Plan designation and applicable general plan policies as well as with all applicable zoning designations and regulations . Designated as General Industrial land use , the Project is consistent with the General Plan in that it furthers the various policies identified in General Plan LU -1 and LU -1.4. Further, the Project is consistent with its Industrial zoning designation set forth in the City’s Zoning Ordinance because indoor and outdoor recreational facilities are an acceptable use under both the General Industrial land use designation and Industrial zoning designation . (City of Baldwin Park Municipal Code Section 153.050.020).
3. The Project occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. The Project is located entirely with in the City of Baldwin Park, consists of approximately 0.60 acres, and is located in an urban setting bounded by industrial uses to the west and east, single -family residential uses to the south, and industrial uses to the north.
4. The Project site is fully developed and located in a developed, urban area, surrounded by commercial, industrial, and residential uses.
Because of these conditions, the Project site does not provide any suitable habitat for endangered, rare, or threatened species.
5. Approval of the Project would not result in any significant effects relating to traffic, noise, air quality, or water quality; analysis has been conducted to ensure the Project does not result in any significant effects relating to May 7, 2025
traffic, noise, air quality, and water quality, including the following: Air Quality Impact Analysis, Noise Impact Analysis, Transportation Vehicle Miles Traveled Screening Memorandum, and Water Quality Technical Report, all of which were reviewed and accepted by the City.
6. The site can be adequately served by all required utilities and public services; the Project site is currently serviced by all required utilities, including but not limited to electricity, natural gas , water, wastewater, solid waste generation, fire protection, police protection, schools, recreation and parks, and libraries a nd therefore will remain adequately serviced.
In addition, none of the exceptions to the categorical exemption as set forth in State CEQA Guidelines section 15300.2 applies:
1. There is no possibility of a cumulative impact of the same type of project in the same place over time. The Project proposes to develop a recreational facility. There is no foreseeable successive project at this site and there is no possibility of a cumulative impact from this same type of project in this area over time. There are no planned development project areas located within a 0.5 -mile radius of the Project site. The Project is also consistent with planning and zoning designations for the site and will be consistent with local and regional planning documents. Thus, for these reasons, the Project will not have the potential to contribute to a local or regional significant cumulative impact.
2. The Project is not marked by unusual circums tances that would create a reasonable possibility of significant effects on the environment There is nothing unusual about the development of a recreational facility that is zoned for this type of use with a conditional use permit . The site is surrounded by industrial, commercial and residential uses and the Project will serve as a recreational facility for residents within the Project area.
3. The Project site is not located within, or visible from, a State Scenic Highway, and the Project will thus not result in damage to scenic resources, within a state scenic highway.
4. The Project site is not located on a site that is included on any list compiled pursuant to Government Code section 65962.5.
5. Finally, the Project would not cause a substantial adverse change in the significance of a historical resource.
The City Council hereby directs Staff to cause a Notice of Exemption be filed with the County Clerk and State Clearinghouse within five (5) working days of the Project approval and adoption of this Resolution.
SECTION 4. The City Council does hereby adopt the following Findings of Fact applicable to all conditional use permits:
CONDITIONAL USE PERMIT
May 7, 2025
(a) Conditionally permitted. The use is conditionally permitted within the subject zone and complies with the intent of all applicable provisions of the Municipal Code. The Project is located in the Industrial (“I”) Zone. The I Zone provides areas for the development of industries engaged in general assembly, manufacturing and processing, and support commercial uses. Section 153.050.020 of the Municipal Code conditionally permits recreational facilities (soccer facility) in the I Zone with an approval by the City’s Planning Commission . The Project complies with the intent of all applicable provisions of the Municipal Co de because the I Zone was established to meet the commerce and service needs of the resident and business communities in the City, as stated in Section 153.050.0100 of the Municipal Code. The Project will provide service-oriented uses that serve both local residents and businesses, because it will offer recreation opportunities to residents and nearby employees . Furthermore, the Project will occupy a large tenant space that is currently vacant, further promoting commercial activity in the I Zone, as intended by the Municipal Code ; and
(b) Zone integrity and character. The use will not impair the integrity and character of the zone in which it is to be located. The Project is located within the I Zone, which allows for uses that provide a broad range of retail, office, and service - oriented commercial uses designed to meet the needs of both the local and residential and business communities. The Project is substantially comparable to existing uses in the I Zone. The Project promotes the integrity and character of the I Zone because the Project will occupy a large tenant space that is currently vacant, which will activate a long-vacant tenant space with a low-impact recreational use that draws visitors primarily on evenings and weekends, complementing the industrial uses during off -peak hours..
Therefore, an indoor/outdoor soccer training facility at the subject location compliments the integrity and character of the zone; and
(c) Site suitability. The subject site is physically suitable for the type of land use being proposed. The onsite circulation has been reviewed and approved by the Los Angeles County Fire Department, confirming that it meets applicable functionality and safety standards. Traffic and c irculation associated with the P roject were also analyzed by a qualified traffic engineer as part of the Categorical Exemption Report, which concluded that the project would not result i n any significant impacts. The Project provides 39 on -site parking spaces, which exceeds both the minimum required by the Municipal Code and the anticipated demand, as de termined through review of the Applicant’s business plan. To further address parking and circulation concerns, a condition of approval has been included requiring the applicant to submit a plan to manage onsite queuing and vehicle idling, in order to prevent offsite impacts. With respect to neighborhood compatibility, the proposed fields and parking area incorporate architectural and site planning features that promote visual integration with the surrounding area. Decorative black screening and fencing will wrap the fields and parking area. While consistent with other industrial properties on the block that also employ fencing, the proposed fencing is enhanced through higher -quality materials and improved design. Decorative wood siding will be installed on the building’s front elevation, consistent with newer industrial developments that aim to exceed the utilitarian appearance typical of the older industrial buildings in the area, most of which were constructed more than five decades ago. The proposed soccer fields are located 10 feet from the rear property line, consistent with the setback requirement for one-story structures in the I Zone. Notably, four other properties on the south side of the block also maintain setbacks at or near this dista nce. Finally, the P roject includes new tree plantings along the southern property line to soften the visual transition between the recreational use and adjacent residential properties; and May 7, 2025
(d) Existing compatibility. The use is compatible with any land uses presently on the subject property. The subject site’s buildings are currently vacant and not being utilized by tenants . The subject property neighbors a headstone manufacturer, three auto body shops, and an aircraft parts manufacturer to the east and west; a community service office, a fleet services office, a construction office to the north; and single -family residences that front on California Avenue to the south . The neighboring facilities operate mostly on week -days and peak business hours. The proposed recreational facility is anticipated to generate business outside of peak business hours and on the weekends. The Project is compatible with land use on the subject property because it provides a compl ementary service to customers that are visiting the existing neighboring facilities. The use is also compatible with the industrial land uses adjacent and in proximity to the subject site; and
(e) Future compatibility. The use will be compatible with existing and future land uses within the zone and the general area in which the proposed use is to be located. Because this recreational use is low -impact, primarily occurs during non - business hours, and will not generate noise or traffic incompatible with industrial operations, it will not preclude future development of surrounding properties consistent with the General Plan .. Further, f uture uses with potential impacts typically require approval of a Conditional Use Permit and therefore would be before the Planning Commission for consideration of the cumulative impacts for the area; and
(f) Utilities and services. Adequate provisions for water, sewer and public utilities and services are available to ensure that the use will not be detrimental to public health and safety. The existing industrial building provides all utilities and services connected and therefore the proposed recreational facility will not be detrimental to public health and safety . Further, the Public Works Conditions of Approval require the submission of a utility plan for City review of existing and proposed future utilities (Public Works Condition of Approval E.3); and
(g) Public Access. Adequate provisions for public access are available to serve the use. The site has direct vehicular and pedestrian access to Joanbridge Street which is designated as an local street in the City’s General Pla n; however, the facility is proximate to Maine Street, which is the predominate way residents will access the facility and this is a collector street with a large traffic volume capacity . The site’s access to streets and highways are adequate in width and pavement type to carry the quantity of traffic generated by the proposed recreational facility . The site includes adequate internal circulation and pedestrian safety features as shown through the approval of the plan by the stamp of approval from Los Angeles County Fire and by condition of approval (ff) for construction plan review through Building Plan Check; and
(h) General Plan consistency. The use is consistent with the General Plan.
The Project is consistent with Land Use Goal 1.0 Balanced Development in Baldwin Park, which proposes a balanced mix and distribution of land uses throughout Baldwin Park. The Project brings to the I Zone a unique but compatible type of commercial activity with recreational soccer activity . The Project also complies with Land Use Policy 1.4 , which is to c reate opportunities for two different levels of commercial development: (1) commercial uses that meet the retail and service needs of the local residents and employee populations, and (2) regional -serving retail commercial businesses that capture revenues from a broader population base . The Project will serve both local youth and adult recreation needs, drawing from the surrounding May 7, 2025
residential areas and businesses; and
(i) Safety and welfare. The use will not be detrimental to the public interest, health, safety, convenience or welfare. Parking is adequate for the proposed use.. The facility will operate in accordance with all applicable health and safety regulations, including occupancy limits, noise restrictions, and security measures, which will be ensured in conditions of approval. . Further, the active recreational use promotes healthy lifestyles for the City’s youth, which supports the general welfare.
SECTION 5. The Application, as herein above described below, and the same is hereby approved subject to the following conditions:
PLANNING CONDITIONS OF APPROVAL
(a) That the property shall be developed and maintained in substantial accordance with the Business Plan Narrative, included as Attachment 3 to the Staff Report, dated March 26, 2025 and minor amendments to the business operations shall be subject to the discretion of the Community Development Director; and
(b) A Lot Merger for the consolidation of the two lots into one is necessary for this project. The Lot Merger application shall be submitted to Public Works and approved prior to submission of this project into Plan Check.
(c) That the soccer training facility shall be staffed with at least two (2) employee at all times. Any reduction/modification to the staffed hours of operation shall require the review and written approval from the Community Development Director prior to implementing; and
(d) Training shall be limited to individuals between the ages of 5 to 17 years; and
(e) That the business shall erect signage that restricts parking to patrons, their parents/guardians, and employees.; and
(f) That all soccer and workout activities shall be held within the subject site.
Programs and activities that involve leaving the property, including but not limited to warm-up runs, shall be prohibited; and
(g) That no ‘walk-ins’ will be permitted, all participants must be enrolled into a training program with a specified time; and
(h) That tournaments are prohibited at this facility.; and
(i) The facility purposes will remain for training only and will limit uses to what is stated on the Business Plan; and
(j) That any products sold within the facility will be pre-packaged and limited to non-alcoholic beverages, snacks and small gym equipment and accessories; and
(k) That the business shall be subject to the noise limits defined in the Baldwin Park Municipal Code. Music and microphone use shall be used indoors only; May 7, 2025
and whistles and horns are prohibited; and
(l) All exterior field lights for the business must be off by 10 PM, and training programs must stop by 9:30 PM and all operations must stop by 10 PM.
(m) That any additional rooftop mechanical equipment needed to operate the business shall be adequately screened from the public right -of-way to the satisfaction of the Community Development Director; and
(n) That the permitted occupancy or total number of patrons to enter the building shall be restricted per applicable Building and Fire Codes whichever is less; and
(o) That the use shall be operated and the subject property be maintained in a neat and orderly manner; and the site shall be kept free of litter and that all graffiti (throughout the property) shall be removed within twenty -four (24) hours at the expense of the applicant and/or owner; and
(p) That all rear and side walls must be painted to match the front elevation of the building. Any proposed exterior painting shall be subject to review by the City’s Planning Division in accordance with the ‘Exterior Colors’ subchapter of the City’s Municipal Code; and
(q) Loitering shall not be permitted on the property; and
(r) The final landscape design shall be submitted during Plan Check. The number, variety and size of the trees proposed on the south side of the development intended for screening use shall be selected appropriately to achieve this objective.
Final approval of the tree and plant variety and size shall be subject to the discretion of the Community Development Department Director; and
(s) The proposed landscaping is subject to the City’s MWELO requirements and shall be subject to review by a consultant landscape architect approved by the City.
Additional fees will apply; and
(t) The proposed landscaping shall served by permanent irrigation; and
(u) That there shall be no outside storage. All storage of materials and/or merchandise shall be completely stored within the confines of the building. Permanent storage of maritime or cargo storage containers are not permitted; and
(v) That the applicant and or property manager shall submit plans for building plan check review for the legalization of any tenant improvements; and
(w) That any proposed changes to the approved floor plan shall be considered by the Planning Division, Building Division, and Los Angeles County Fire, and shall require written authorization of the City Planner prior to implementation; and
(x) That any permanent or temporary signage shall require a sign permit and shall be made in accordance with the City’s sign regulations within thirty (30) days of Planning Commission approval of this conditional use permit; and
(y) That the Applicant shall comply with and maintain compliance with the May 7, 2025
city’s National Pollutant Discharge Elimination System (NPDES) requirements; and
(z) That all existing trash enclosures must be brought up to compliance with the requirements noted in Section 153.130.070 of the City’s Municipal Code. This includes compliance with the city’s NPDES standards that require trash enclosures have a solid roof covering. The design of the enclosure shall be fully enclosed, lockable, and free of barbed wire. The design of the trash enclosure will be subject to a Design Review with the Planning Division prior to construction; and
(aa) That the Applicant is prohibited from causing or allowing the deposit or disposal hazardous substances at the property. The Applicant shall be responsible for any clean -up and decontamination on or off the property necessitated by the introduction of hazardous substances. The phrase “hazardous substance”, as used herein, has the same meaning as the phrase used under Section 25359.7 of the California Health and Safety Code; and
(bb) That a copy of this resolution shall be kept at the front counter at all times and available for review by public safety personnel and other authorized City staff; and
(cc) The business owner and manager of the establishment shall be strictly accountable for compliance with all conditions imposed as part of this conditional use permit, whether or not the owner or manager are personally present at the location; and
(dd) That the applicant shall obtain any all applicable State and Federal Licenses prior to obtaining a business license from the City of Baldwin Park; and
(ee) That except for all ongoing conditions of approval, the Applicant shall comply with all conditions of approval within one (1) year of the effective date of this Resolution PC 23-28 or CP 23-05 shall become null and void; and
(ff) That the application shall sign a notarized affidavit within ten (10) days after the date of this resolution stating that the applicant has read and accepts all of the conditions of approval.
BUILDING CONDITIONS OF APPROVAL
(gg) All Conditions of Approval as approved by the Planning Commission shall appear as notes on the plans submitted for building plan check and permits.
(hh) Building design shall comply with the Current Edition of the California Building Code (CBC).
(ii) Submit complete c onstruction plans to the Building Division for formal plans review and building permit.
(jj) Separate application(s) plan check(s), and permit(s) is/are required for:
a. Grading (see Engineering Division for requirements)
b. Demolition work
c. Retaining walls (see Engineering Division for requirements) d. Block walls exceeding 6 feet in height
e. Signs
May 7, 2025
f. Fire sprinkler/Alarm systems (see LA County Fire Department Prevention Division for requirements)
g. Plumbing
h. Mechanical
i. Electrical
(kk) Complete architectural plans prepared a by State licensed architect will be required. Submit design for review at formal plans review.
(ll) Complete structural plans with calculations by State licensed engineer or architect will be required. Submit design for review at formal plans review.
(mm) Compliance to California T -24 Energy regulations will be required.
Submit design for review at formal plans review.
(nn) Compliance to California Green Building Standards Code will be required. Submit design for review at formal plans review.
(oo) Separate plumbing, mechanical and electrical plan check will be required. Submit design for review at formal plans review.
(pp) Separate soils and geology report is required to address the potential for and the mitigation measures of any seismic induced landslide/liquefaction. Soils report shall address foundation design and site preparation requirements.
(qq) Los Angeles County Fire Prevention plans review and approval is required for the proposed occupancy. Contact (323) 890 -4125 for plans submittal requirements.
(rr) Sanitation District Industrial Waste approval or waiver is required.
Please contact (562) 699-7411, Ext 2900 for additional information.
(ss) All new on -site utility service lines shall be placed underground. BPMC Section 153.140.050.
(tt) A complete code analysis is required. Address type of construction, occupancy, exiting, allowable areas, allowable heights, etc. Provide a summary on the drawing.
(uu) Provide Fire Alarms and Detection systems complying with CBC § 907 for the following projects:
A. Group A occupancy with occupant load > 300. See CBS Sections 907.2.1.1, 907.2.1.2, and 907.2.1.3 for additional requirements.
(vv) Provide fire sprinklers complying with CBC § 903.3.1 for the following projects:
A. Group A1, A1, and A3 occupancies having fire area located on a floor other than the level of exist discharge. CBC CBC § 903.2.1.1, 903.2.1.2, and 903.2.1.3.
(ww) Compliance with the State of California Accessibility regulations is May 7, 2025
required, including:
A. Building entrances shall be provided with an accessible path of travel connecting the building entrances from the public sidewalk, accessible parking, and other buildings or essential facilities on the site.
B. Accessible parking:
C. Shall be located at each main entrance. Where multiple major loading and unloading passenger access aisle of 8 feet wide for Van space and 5 feet wide for regular accessible spaces.
D. Parking garages containing accessibly parking stalls shall be provided with a vertical clearance of 8’2” or more.
E. All restrooms servicing the building shall be accessible.
F. Aisles and seating shall be accessible.
G. Drinking fountains (high/low) are required to be accessible.
(xx) Total plumbing fixtures required shall be determined by California Plumbing Code (CPC).
(yy) A lot tie is required to be recorded prior to the issuance of any permits.
(zz) The final map shall be recorded prior to the issuance of any building permit.
PUBLIC WORKS CONDITIONS OF APPROVAL
A. GENERAL
1. An Erosion Control Plan shall be submitted concurrently with the grading plan clearly detailing erosion control measures. These measures shall be implemented during construction. The erosion control plan shall conform to national Pollutant Discharge Elimination System (NPDES) standards and incorporate the appropriate Best Management Practices (BMP’s) as specified in the Storm Water BMP Certification. For construction activity which disturbs one acre or greater soil a Storm Water Pollution Prevention Plan (SWPPP) will be needed.
2. The applicant shall comply with Low Impact Development (LID) requirements to the satisfaction of the City Engineer. Please refer to City handouts.
3. Applicant shall submit a Lot-Line Adjustment application to Engineering Division to combine all proposed lots being merged.
4. Provide a title report (less than 1 year old) that shows all existing easements within the lot boundary.
5. Provide an engineering cost estimate for all onsite and offsite improvements, signed, and stamped by licensed engineer.
6. Applicant shall prepare a covenant agreement for LID Measures to be approved by City Engineer. Applicant shall file with County recorder’s Office.
May 7, 2025
B. GRADING / DRAINAGE / HYDROLOGY
1. The Owner shall execute and record a covenant agreement to maintain and hold the City harmless for all existing improvements in the public right-of-way.
2. Submit a Demolition Plan showing disposition of existing improvements, existing utilities, and all easements.
3. State of California report prepared by a Geotechnical Engineer, licensed by the State of California, shall be submitted by the applicant for approval by the City. The soil/geotechnical report shall address any soil preparation, foundation design criteria and to identify any other hazards pertaining to seismic activity or drainage issues.
4. Upon approval of the soil/geotechnical report, the applicant shall submit drainage and grading plans prepared by a Civil Engineer, licensed by the State of California, prepared in accordance with the City’s requirements, the California Building Code, and acceptable grading practices for the City’s review and approval. A list of requirements for grading plan check is available from the Public Works Department. All grading (cut, fill and over excavation) calculations shall be submitted to the City concurrently with the grading plan.
5. The grading plan shall show the location of any retaining walls and the elevations of the top of wall/footing/retaining and the finished grade on both sides of the retaining wall. Construction details for retaining walls shall be shown on the grading plan.
Calculations and details of retaining walls shall be submitted to the Building and Safety Division for review and approval.
6. All easements shall be clearly identified on the grading plan.
7. Submit a stockpile plan showing the proposed location for stockpile for grading export materials, and the route of transport.
8. Detailed drainage system information of the lot with careful attention to any flood hazard area shall be submitted. All drainage/runoff from the development shall be conveyed from the site to the natural drainage course. No on-site drainage shall be conveyed to adjacent parcels unless that is the natural drainage course.
9. Submit a photometric plan as part of grading submittal, including but not limited to the illumination levels at driveway entries, passenger loading zones and collector driveways.
10. All slopes shall be seeded with native grasses or planted with ground cover, shrubs, and trees for erosion control upon completion of grading or some other alternative method of erosion control shall be completed to the satisfaction of the City Engineer.
11. Rough grade certification by project soils and CA licensed civil engineers shall be submitted prior to issuance of building permits.
12. Final grade & pad certifications by project soils and CA licensed civil engineers shall be submitted to the Public Works Department prior to the issuance of any project final inspections/certificate of occupancy respectively.
May 7, 2025
13. Prior to the issuance of a grading permit, a complete hydrology and hydraulic study shall be prepared by a Civil Engineer registered in the State of California to the satisfaction of the City Engineer and Los Angeles Public Works Department.
14. A pre-construction meeting shall be held at the project site with the grading contractor, applicant, and city grading inspector at least 48 hours prior to commencing grading operations.
C. OFF-SITE STREET IMPROVEMENTS
1. All public improvement shall be approved by the City Engineer, constructed with an encroachment permit and completed prior to final inspection/certificate of occupancy issuance.
2. Applicant shall construct a 10 -foot-wide concrete parkway/sidewalk (the length of the subject property’s frontage) behind the existing concrete gutter.
3. 2” Coldmill and Overlay from edge of gutter to street centerline for Joanbridge St. fronting the project site.
4. The applicant shall replace and record any centerline ties and monuments that are removed as part of this construction with the Los Angeles County Public Works Survey Division.
5. Applicant shall remove existing improvements within the public right of way including bollards fronting project site.
6. Prior to the issuance of any permits, the applicant shall provide written permission to the satisfaction of the City from any property owners which will be affected by offsite grading.
7. Prior to building occupancy, applicant shall construct base and pavement for all streets in accordance with soils report prepared by a California registered geotechnical engineer and approved by the City Engineer or as otherwise directed by the City Engineer.
E. UTILITIES
1. Applicant shall provide a utility plan for all wet and dry utilities servicing the proposed development. Utility plan shall be prepared by a Licensed Civil Engineer, in the State of California, and included as part of the improvement plans. The plan shall indicate all existing and proposed utilities and the location of all public and private utilities to the satisfaction of the City Engineer.
2. Easements, satisfactory to the City Engineer and the utility companies, for public utility and public services purpose shall be offered and shown on the detailed site plan for dedication to the City or affected utility company.
3. Will Serve Letters shall be submitted stating that adequate facilities are or will be available to serve the proposed project shall be submitted to the City from all utilities such as, but not limited to, phone, gas, water, electric, and cable.
4. Applicant shall relocate and underground any existing on -site utilities to the satisfaction of the City Engineer and the respective utility owner.
May 7, 2025
5. Underground utilities shall not be constructed within the drip line of any mature tree except as approved by a registered arborist.
F. SEWERS
1. Applicant shall construct individual sewer services for each unit and obtain connection permit(s) from the City and County Sanitation District prior to issuance of building permits. Sewer plans shall be submitted for review and approval by the City.
2. For new sewer laterals, the existing sewer lateral shall be replaced and/or removed if no longer used.
3. Show the sewer lateral size and locations for each unit and how they will connect to the sewer main. Show the size and location of the back-flow preventer if applicable.
4. Applicant to provide a sewer study prepared by a Licensed Civil Engineer, in the State of California, demonstrating that the existing sewer mains have sufficient capacity to support the proposed improvements. The study should include results of an inspection of the condition of the existing sewer line servicing the subject property.
LOS ANGELES COUNTY FIRE
1. Applicant is required to submit plans to Los Angeles County Fire prior to Building permit issuance, addressing drafting error indicating a 3 -foot front yard setback.
2. Applicant is responsible for addressing any and all conditions issued by the Los Angeles County Fire Land Use Development Department.
3. Applicant must provide status, conditions, and approvals issued by Los Angeles County Fire to City Planning Staff.
SECTION 6. The City Council does hereby adopt the following Findings of Fact applicable to the Design Review application:
1. The primary objective of the Design Guidelines is to provide for functional site planning, integrate architectural elements within a project and within streetscapes, protect privacy and ensure the provision of high-quality projects.
2. The proposed design improvements comply with the Design Guidelines by integrating functional site planning with architectural elements that enhance the streetscape, while also protecting residential privacy through the use of concealed netting and landscaping.
3. The inclusion of high -quality materials, such as Ash wood siding, decorative black wire mesh, and the installation of mature trees along the south elevation, ensures a visually appealing and contextually sensitive project that aligns with the intent to maintain privacy and high-quality design standards.
SECTION 7. Pursuant to the foregoing recitations and findings, the City Council denies the appeal and upholds the Planning Commission decision to approve a conditional use permit and design review application for a new soccer training use and to May 7, 2025
find the proposed project categorically exempt from CEQA pursuant to CEQA guidelines Section 15332..
SECTION 8. The City Clerk shall Certify to the passage of the adoption of this resolution and enter it into the book of original resolutions.
SECTION 9. This resolution shall become effective immediately upon its adoption.
SECTION 10. The City Clerk shall certify to the adoption of this resolution and hereafter the same shall be in full force and effect.
PASSED AND APPROVED this 7th day of May, 2025.
_____________________________________
ALEJANDRA AVILA
MAYOR
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES ss.
CITY OF BALDWIN PARK
I, Christopher Saenz, City Clerk of the Baldwin Park City Council, do hereby certify that the foregoing Resolution No. 2025-008 was duly and regularly approved and adopted by the City Council at a regular meeting thereof, held on May 7, 2025 and that the same was adopted by the following to wit:
AYES:
NOES:
ABSTAIN:
ABSENT:
________________________________________
CHRISTOPHER SAENZ
CITY CLERK
RESOLUTION PC 23-28
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
BALDWIN PARK APPROVING A CONDITIONAL USE PERMIT TO
ALLOW RECREATIONAL FACILITY (INDOOR/OUTDOOR SOCCER
FACILITY) USE, AND A DESIGN REVIEW TO REVIEW THE BUILDING ARCHITECTURE AND SITE DESIGN. (LOCATION: 14412 & 14424
JOANBRIDGE STREET; APPLICANT: TRINIDAD CAMPBELL; CASE
NUMBER: CP 23-05, PR 23-21), AND FINDING THE PROPOSED
PROJECT IS CATEGORICALLY EXEMPT FROM THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO STATE
CEQA GUIDELINES SECTION 15332.
THE PLANNING COMMISSION OF THE CITY OF BALDWIN PARK DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The Planning Commission of the City of Baldwin Park does hereby find, determine, and declare as follows:
(a) An application for a conditional use permit ("Application") was submitted on behalf of the owner of certain real properties, located at 14412 & 14424 Joanbridge Street in the City of Baldwin Park, described more particularly in the Applications on file with the City Planner; and
(b) The Application sought to approve a Conditional Use Permit to allow a recreational facility (the "Project") according to pursuant to the City's Industrial Zone and Municipal Code; and
(c) Pursuant to Section 21067 of the Public Resources Code, and Section 15367 of the California Environmental Quality Act ("CEQA") Guidelines (Cal. Code Regs., tit. 14, § 15000 et seq.), the City of Baldwin Park is the lead agency for the proposed Project; and
( d) The City of Baldwin Park has determined that the Project is categorically exempt from CEQA pursuant to State CEQA Guidelines, section 15332 - In-Fill Development Projects (Class 32); and
( e) A duly noticed public hearing was held on March 26, 2025, and said Application by the Planning Commission, and based upon evidence presented including applicable staff reports and each member of the Commission being familiar with the property, it was determined that the facts as required by the Baldwin Park Municipal Code for the granting of such Application are present and that the Conditional Use Permit should be approved subject to the terms of this Resolution; and (f) Each fact set forth in the staff report dated March 26, 2025, from Nick Baldwin, Acting Community Development Director/City Planner to the Chair and Planning Commissioners ("Staff Report") is true and correct.
SECTION 2. The Planning Commission does hereby find that the proposed Project is categorically exempt from CEQA per the Class 32 (In-Fill Development Projects) set forth in State CEQA Guidelines section 15332 for the following reasons:
1. The Project constitutes in-fill development;
REVISED ATTACHMENT 5/4/25
Training Session
Players Age Group
Grassroots (4:00-6:00 pm)
Ages 5-12
Field #1 (Training ONLY) 2 11-12
Field #2 (Warm Up ONLY) 2 8-10
Field #3 6 5-7
Field #4 6 8-10
Field #5 8 11-12
Total Players 24
Sports Performance (6:00-8:00 pm)
Ages 13-17
Field #1 (Training ONLY) 4 15-17
Field #2 (Warm Up ONLY) 4 13-14
Field #3 6 13-14
Field #4 6 14-15
Field #5 6 16-17
Total Players 26
Recreational Use (8:00- 10:00 pm)
Ages 5-17
Field #1 (Training ONLY) 2 8-10
Field #2 (Warm Up ONLY) 2 5-7
Field #3 6 11-13
Field #4 6 14-15
Field #5 8 16-17
Total Players 24
Training Session
Players Age Group
Grassroots (9:00-11:30 am)
Ages 5-12
Field #1 (Training ONLY) 2 11-12
Field #2 (Warm Up ONLY) 2 8-10
Field #3 8 5-7
Field #4 8 8-10
Field #5 8 11-12
Total Players 26
Sports Performance (1:00-3:00 pm)
Ages 13-17
Field #1 (Training ONLY) 4 15-17
Field #2 4 13-14
Oper
Field #3 6 13-14
Field #4 6 14-15
Field #5 6 16-17
Total Players 26
Recreational Use (4:00- 6:00 pm)
Ages 5-17
Field #1 2 8-10
Field #2 2 5-7
Field #3 8 11-13
Field #4 8 14-15
Field #5 8 16-17
Total Players 24
Training Session ours 8:00 am- 2:00 pm: Sunday Schedule Players Age Group
Grassroots (8:00-10:00 am)
Ages 5-12
Field #1 2 11-12
Field #2 2 8-10
Field #3 6 5-7
Field #4 6 8-10
Field #5 8 11-12
Total Players 22
Sports Performance (10:00am-
12:00 pm) Ages 13-17
Field #1 (Training ONLY) 4 15-17
Field #2 4 13-14
Field #3 6 13-14
Field #4 6 14-15
Field #5 6 16-17
Total Players 26
Recreational Use (12:00- 2:00 pm)
Ages 5-17
Field #1 2 8-10
Field #2 2 5-7
Field #3 6 11-13
Field #4 6 14-15
Field #5 8 16-17
Total Players 20
Grade Level Staff On Duty Drop Off Player Percentage
2 40%
Elementary/Jr High
Elementary
Elementary
Elementary
Elementary/Jr High
24 x 40% =10 players
3 60%
High School
Jr. High
Jr. High
High School
High School
26 x 60% = 16 players
3 30%
Jr. High
Elementary
Jr. High
High School
High School
24 x 30% = 8 players
Grade Level Staff On Duty Drop Off Percentage
2 40%
Elementary/Jr High
Elementary
Elementary
Elementary
Elementary/Jr High
24 x 40% =10 players
3 60%
High School
Jr. High
rating Hours 4:00 pm- 10:00 pm: Monday -Friday Schedule Operating Hours 9:00- 6:00 pm: Saturday Schedule
Jr. High
High School
High School
26 x 60% = 16 players
3 30%
Jr. High
Elementary
Jr. High
High School
High School
24 x 30% = 8 players
Grade Level Staff On Duty Drop Off Percentage
2 40%
Elementary/Jr High
Elementary
Elementary
Elementary
Elementary/Jr High
24 x 40% =10 players
3 60%
High School
Jr. High
High School
High School
High School
26 x 60% = 16 players
3 30%
Jr. High
Elementary
High School
High School
High School
24 x 30% = 8 players
Parking Spaces Required
16 14 players +2 staff = 16
13 10 players + 3 staff =13
19 16 players + 3 staff= 19
Parking Spaces Required
16 14 players +2 staff = 16
13 Players must register for sessions i
maxed out and only the number of
There are NO WALK INS permit
DISCLAIMER
10 players + 3 staff =13
19 16 players + 3 staff= 19
Parking Spaces Required
16 14 players +2 staff = 16
13 10 players + 3 staff =13
19 16 players + 3 staff= 19
including recreational use. All Sessions and recreational use are booked 24 hours f players noted will be permitted into the sessions.
tted only those players registered for the session will be allowed into the lab. NO
1 12/12/23 Comments
Public Comment Synopsis
Project Description: Two Level, 23,259 square foot soccer complex facility, covering 84% of the lot; with four (4) soccer fields outdoor on the second level of a 25’ tall square monolithic structure, 167- feet deep by 150- feet wide; producing noise above allowed levels; intrusive nighttime light/glare above allowed levels; insufficient parking per code; increased traffic congestion and personal privacy and safety intrusions Description of
issue
Public
Comments
Law
BP General
Plan
Municipal
Code
PC 12/13/23
Staff Report
Initial study
Att. #6
Initial study
12/13/2023
Planning
Commission
Staff Report
PC 12/12/23
Staff
Report
Architectural
Plans Att.# 3
Not Consistent
with General
Plan (pg.4 of
comment
document)
All proposals
must be
consistent with
BP General
Plan
Opinion: Yes
NO
Proposed Use
(pg. 7 of
comment
document))
General Plan
(LU Policy 2.5)
BP MuniCode:
153.050.020
Recreational
Facility /
outdoor use
allowed
School use not
allowed
2-story soccer
training facility
Recreational
facility (indoor
/outdoor
soccer facility)
(pg.1) and
School use
Parking
requirement
(pg3)
Soccer Sports
Complex
(pg.T-1.0)
Not enough
on-site Parking
(pg.8 - 9 of
comment
document)
General Plan
(LU Policy 2.5)
BP MuniCode
153.150.040
Commercial
Recreation
Use
152 Parking
spaces
required
Traffic
Mitigation
Measure TRA1
required
Not included in
Conditions of
Approval
(Exhibit MM)
Elementary
school (private)
use
13 required
Proposed Per
submitted
architectural
plans
(pg. T-1.1)
39 parking
spaces
provided
No available
street parking
on Joanbridge
Street (pg. 22
of comment
document)
General Plan
(LU Policy 2.5)
BP MuniCode
153.150.010
Mitigation
Measure TRA1
required
Not included in
Conditions of
Approval
Not addressed
Not addressed
2 Requires
adequate off-
street parking
(Exhibit MM)
Description of
issue
Public
Comments
Law
BP General
Plan
Municipal
Code
Initial study Application
Staff Report
As shown on
submitted
Plans
Soccer
Complex is too
large for
project site
Lot Coverage
(pg.10 of
com
ment
document)
General Plan
(LU Policy 2.5)
BP MuniCode
150.050.030
Lot Coverage:
50% of the lot
can be
covered.
(13,122 sq.ft.
allowed )
Not addressed
Not addressed
per applicant
site Plan (pgs.
T-1.0 & T-1.1)
Proposed
84%
(22,0607 sq.ft)
Soccer
Complex is too
large for
project site
Floor Area
Ratio (FAR)
(pg.11 of
com
ment
document)
General Plan
(LU Policy 2.5)
BP MuniCode
153.050.030
Floor Area
Ratio (FAR)
no more than
.75 FAR
allowed
Not addressed
Not addressed
Per applicant
site Plan (pgs.
T-1.0 & T-1.1)
(Floor Area
Ratio)
.88 FAR
proposed
Soccer
Complex is too
large for
project site
Set
backs
(pg. 12 of
comment
document)
General Plan
(LU Policy 2.5)
BP MuniCode
153.050.030
Required
Setbacks
Front: 5’
Sides: 10’
Rear: 20’
Not addressed
Zone Variance
Request:
Setbacks
Front: none
requested
Side: 5’
Rear: 5’
Per submitted
plans
(pg. A-1.1 & A-
1.2)
Setbacks
Front: 3’ – 8’
Side: 0 feet
Rear: 5’
Noise will
exceed City
Standards for
allowable
Noise Level in
Residential
Areas
General Plan
(LU Policy 2.5)
BP MuniCode
(153.140.070)
Allowable
noise levels:
55 dbA (day)
Initial Study
Noise
Monitoring
Study
91.8 dbA (day)
Not addressed
Not addressed
3 (pg.12 - 16 of
comment
document)
50 dbA
(evening)
78.3 dbA
(evening)
Description of
issue
Public
Comments
Law
BP General
Plan
Municipal
Code
Initial study Application
Staff Report
As shown on
submitted
Plans
Glare and Light
will exceed City
allowable Light
and Glare
Standards
(pg.16 of
comment
document)
General Plan
(LU policy 2.5)
BP MuniCode
(153.140.020)
No spillover
light/glare
allowed.
Buffers are
required.
Mitigation
Measure AES-
1# Schematic
Lighting Plan
required for
Planning
Commission
review; no
lighting plan
submitted
Not addressed
Soccer field
flood lights not
shown on
elevations or
site plans
Pg.2
Fire Dept
Submittal
shows location
of proposed
lights. No
height details.
Residential
Privacy will be
compromised
(pg. 19 of
com
ment
document)
General Plan
(LU policy 2.5)
“Require that
… commercial
and industrial
development
provide
adequate
buffers
and to
provide visual
compatibility.”
BP MuniCode
(153.140.020)
Privacy of
residential
homes must be
protected with
buffers.
Not addressed
Not addressed
Proposed re-
use of existing
6’ tall wall to
shield adjacent
residential
back yards
from 25’ tall
soccer
complex facility
building
privacy issues
(pg.
A-1.4 rear
elevation)
Proposed
Soccer
Complex
Facility Design
Not Visually
Compatible
with
surrounding
General Plan
(LU policy 2.5)
“Require that
… commercial
and industrial
development
provide
adequate
Not Addressed
Not addressed
Proposed re-
use of existing
6’ tall wall to
provide visual
compatibility
25’ tall soccer
complex facility
with adjacent
4 area (pg.19 of
comment
document)
buffers and to
provide visual
compatibility.”
BP MuniCode
(153.140.020)
residential
homes
(pg. A-1.4 rear
elevation)
California Environmental Quality Act (CEQA)
The proposed project is not in compliance with California Environmental Quality Act (CEQA) as shown on Pg. 52 of the Public Comments /Administrative Record The Planning Commission cannot make Finding #1, Finding #2, Finding #3 or Finding of Fact #4. Therefore, the application for the construction of the proposed two Level, 23,259 square foot soccer complex facility, covering 84% of the lot; with four (4) soccer fields outdoor on the second level of a 25’ tall square monolithic structure, 167- feet deep by 150- feet wide; producing noise above allowed levels; intrusive nighttime light/glare above allowed levels; insufficient parking per code; increased traffic congestion and personal privacy and safety intrusions must be denied due to non- compliance with CEQA.
In the case of the Finding of Facts for the granting of the proposed CP 23-05, none of the Finding of Facts can be made, therefore, the Planning Commission can not approve Conditional Use Permit CP 23-05.
Baldwin Park Municipal Code 153.210.480 (Determination) “The Planning Commission may impose conditions and/or require guarantees for the conditional use permit to ensure compliance and to prevent adverse or detrimental impacts to the surrounding neighborhood. Conditional use permits shall be granted when the Planning Commission determines that the proposed use or activity complies with all of the following findings.”
In the case of the Finding of Facts for the granting of the proposed CP 23-05, none of the Finding of Facts can be made, therefore, the Planning Commission can not approve Conditional Use Permit CP 23-05.(pg. 6)
Baldwin Park Municipal Code 153.210.430 (Determination) The Planning Commission may impose conditions and/or require guarantees for the variance to ensure compliance and to prevent adverse or detrimental impacts to the surrounding neighborhood. Variances shall be granted only when the Planning Commission determines that the proposed development or activity complies with all of the following findings.
In the case of the Finding of Facts for the granting of the proposed Zone Variance ZV 23-01, none of the Finding of Facts can be made, therefore, the Planning Commission can not approve Zone Variance ZV 23-01. (pg. 41)
5 February 1, 2024 Comments
February 1, 2024
Arguments against the adoption of Resolution PC 23-28 which would grant approval of the proposed Conditional Use Permit CP 23-05, Zoning Variance ZV 23-01, and PR 23- 21, as was discussed in the December 13, 2023, City of Baldwin Park Planning Commission meeting Staff Report, to be submitted as part of the Public Administrative Record of the Resolutions action mentioned above.
Planning Commission staff report: Discussion (pg. 2)
Request: Conditional Use Permit “to allow for a recreational facility (indoor/outdoor soccer facility) within an existing commercial complex.”
Public Comment: the proposed location are two industrial lots on Joanbridge Street in an industrial zone. The lots are not zoned commercial nor are they in any type of a complex.
(see Baldwin Park General Plan Land Use Map exhibit A this document)
Staff Report (pg. 2): Zone Variance request for deviation from the minimum ten-foot (10’) side and rear yard setback requirement in the I zone to allow for “larger soccer fields on the second floor” and to “improve the practicality” of the project.
Public Comment: the minimum required rear yard setback for new construction in the Industrial zone and situated next to an existing residential zone is twenty- feet (20’). (see Baldwin Park Municipal Code 153.05.030) A zone variance is not the vehicle to ensure the profitability or practicality of a business.
Staff Report (pg. 2): “The proposal includes a complete remodel of the existing unit on Parcel 1 and the demolition of the building on Parcel 2. The proposed ground floor layout will consist of one (1) new indoor ground level soccer field of 3,825-square feet in size, a meeting room, men and women restrooms, and a gym room within the remodeled building. A 39-stall parking structure will be built surrounding the building which will include a trash enclosure, additional mem and women restrooms, and staircases and an elevator to access the second floor.”
“The second floor of the remodeled building will include a meeting room, four (4) offices, a kitchen, restroom, one soccer field of 2,314-square feet in size.
The second floor above the parking area will have three (3) outdoor soccer fields on the second floor ranging from 3,410-square feet to 3,770 square feet.”
Public comment:
6 • No discussion of the fact that the twenty-five foot (25’) tall and one hundred fifty foot (150’) wide structure is proposed to cover all of the 150’ width of the lot. This is a proposed Lot Coverage of 84% when the Municipal Code Lot Coverage requirement is for 50% Lot Coverage (see Baldwin Park Municipal Code 153.05.030)
• No discussion of the fact that the proposed Floor Area Ratio of the project is .88 when the maximum allowable Floor Area Ratio .75 (see Baldwin Park General Plan Land Use FAR Exhibit D this document ) • no discussion of the fact that 152 parking stalls are required, but only 39 parking stalls are proposed (see Baldwin Park Municipal Code 153.150.040)
Staff Report: “As a condition of approval, the applicant will also be required to install mature trees and plants to soften the south elevation and created (sic) an additional barrier between current residential properties abutting the soccer facility.” Pg.3
Public Comment: no discussion or explanation as to how mature trees and plants will fit into, and be able to grow in, the requested narrow five-foot (5’) south rear yard setback.
Staff Report (Pg.3): Business Operations Plan and Hours of Operation “Conditions have been included in the Planning Commission Resolution (Attachment #1) to address issues that could have an impact on surrounding businesses and residents. These include restrictions on the maximum number of students present for instruction during any given time, property maintenance standards to limit and deter graffiti on exterior walls.”
Public Comment: As you have probably already noticed, Planning Commission Resolution, Attachment #1. is the Resolution of the Mitigation Negative Declaration Resolution PC 23-29. This Resolution has only THREE (3) Conditions of approval.
TCR-1 Retain a Native American Monitor prior to ground disturbing activities TCR-2 Unanticipated Discovery of Tribal Cultural Resources Objects TCR-3 Unanticipated Discovery of Human Remains
None of which address restrictions on the maximum number of students present for instruction during any given time, property maintenance standards to limit and deter graffiti on exterior walls.
Attachment #2 Resolution of Approval – PC 23-28 would be the place to look for restrictions to “address issues that could have an impact on surrounding businesses and residents”, such as: maximum number of students present for instruction during any given time, hours of operation, operating standards like noise, traffic, parking.
Unfortunately, none of those conditions exist there either.
7 The conditions that somewhat pertain to “issues that could have an impact on surrounding businesses and residents” and that are listed and say:
(c) 2 staff at all times;
(d) activities must be held on site;
(e) No walk-ins, members only;
(f) no tournaments;
(g) no alcohol sold (I guess it can be consumed but not sold); (h) Music indoors only, noise study at later date, subject to noise limit; (i) light study at later date;
(j) field lights off by 10 PM.
If approved as written and presented, Resolution of Approval – P C 23-28 would allow the developers to construct whatever kind of Recreational Facility (indoor/outdoor soccer facility) they want within 5 feet of a residential neighborhood, regardless of what is discussed at the review hearing. Even though the site plans and elevations may be discussed, there are no Conditions of Approval requiring that the applicant shall be required to build a soccer complex facility according to those plans; no Conditions of Approval that the constructed soccer complex facility will resemble the submitted site or elevation plans what-so-ever.
• There are no Conditions of Approval limiting the soccer complex to a so-called soccer training school; no Condition of Approval that would prohibit soccer games for all ages except that the facility Is for members only: “all participants shall be enrolled in a training program (Condition #e).
• There are no Condition of Approval to limit the hours of operation to those stated in the staff report, which means that all-day and all-night play would be available, as long as the “exterior field lights go off at 10 pm” (Condition #j). Play can continue without “exterior field lights” without restrictions.
• There are no Conditions of Approval limiting the ages of the soccer players to students aged 5 – 17; no Conditions of Approval that will limit the size of the soccer teams or the frequency of the games, except that there can be “no tournaments.”
• There are no Conditions of Approval requiring a specific number of parking spaces. The applicant is proposing 39 parking spaces while the Baldwin Park Municipal Code requires 152 spaces for a commercial recreational use. The size of the site plan will not accommodate the size of the proposed soccer complex with 152 parking spaces included.
• There are no Conditions of Approval from the City Departments, listed below, because they have not been requested by staff to review the submitted proposal, even though Municipal Code Section 153.210.090 states: Application materials 8 shall be circulated to other city departments and agencies for review and comment as determined necessary or appropriate by the City Planner. Planning Division staff shall be responsible for requesting and incorporating comments into project modifications or conditions of approval to ensure conformance with all provisions of this code and other adopted policies and plans. • All Conditions of Approval included in the Resolution of Approval PC 23-28, regarding the following Divisions are “place holder” conditions to postpone the project review by these Departments until after the Planning Commission has already approved the project, leaving no Planning Commission or public oversight.
• No Building Division review of photometric plans (for light and glare); • No Engineering Division Review (for retaining wall grading, undergrounding utilities)
• No Fire Department Review regarding increased fire and paramedic calls for service
• No Police Department Review (for increased disturbance, noise and light glare nuisance calls)
• No Public Works Department Review (for traffic circulation issues) • No Landscaping Review
The Planning Commission is being asked to be responsible for approving a project that is not consistent with Baldwin Park General Plan, the spirit of the law, and in direct conflict with the City of Baldwin Park Municipal Code, which is the direct rules of law.
The following sections of the Staff Report apply to the legal requirements of any project requiring approval by the Planning Commission. I apologize that the comments are so very detailed, but that is because, as I said in my letter to you on December 12, 2023 before the first scheduled Public Hearing for this Project on December 13, 2023, it is required that any issue I would need to bring up the Baldwin Park City Council to appeal any Planning Commission decision or any issue that I would want to address in a court of law in lawsuit, would need to be detailed in my comments to you. Also, the Planning Commission should have all the facts and details so they can make an informed decision
Planning Commission staff report (pg.3): General Plan Consistency 153.200.200 CONSISTENCY WITH GENERAL PLAN
REQUIRED. (A) Notwithstanding anything else contained in this code or any rule or regulation of the city, but subject to the non-conforming use provisions of this subchapter, no permit of any kind shall be issued by or on behalf of the city for any use, building, structure, or business which is not consistent with the city’s General Plan, as adopted on November 20, 2002.
Planning Commission staff report states:
9 “The project site is designated as “General Commercial” in the City of Baldwin Park General Plan The proposed project is consistent with the following General Plan goals and policies.”
Comment: The project site is not designated General Commercial in the City of Baldwin Park General Plan; it is designated General Industrial. (Exhibit A)
Land Use Goal1.0 Bal anced Development in Baldwin Park. Maintain a balanced mix and distribution of land uses throughout Baldwin Park.
Land Use Policy 1.4 Creat e opportunities for two different levels of commercial development: (1) commercial uses that meet the retail and service needs of the local residents and employee populations, and (2) regional-serving retail commercial businesses that capture revenues from a broader population base.
Comment: Simply listing the definition of a Land Use Goal or Policy does not support the contention that the particular goal or policy is being met.
Re
garding Land Use Goal1.0, the staff report doesn’t clarify how constructing a 5- soccer field soccer complex project, with 4 elevated outdoor soccer fields, creating new increased noise levels, creating new light/glare, creating new increased trash, creating increased traffic and parking problems, all next to an existing residential use, is a “Balanced Development.” The intention of Land Use Goal 1.0, that is, to “maintain a balanced mix and distribution of land uses throughout Baldwin Park” is not to locate a nuisance-generating, commercial use directly next to an existing residential use. If that was the intention of the Baldwin Park General Plan, then the Baldwin Park Municipal Code would allow a commercial recreational facility in a residential zone, which it does not.
Regarding Land Use Policy 1.4, “C
reate opportunities for two different levels of
commercial development”; the subject site is located in an Industrial zone, not in a zone created for commercial uses or commercial development. Further, the Industrial zone properties are zoned ‘Industrial’, so as to provide the City of Baldwin Park with manufacturing uses to generate a manufacturing tax base of income for the City. The proposed soccer complex facility use will not generate any commercial sales tax revenue for the City and will actually be fiscally detriment to the City by removing two (2) tax-generating industrial properties from the City’s tax rolls and replacing them with one commercial use which will actually increase the calls for Police, Fire and Code Enforcement service through complaints, injuries, and nuisance disturbances to the residential homes. Therefore, the proposed use is not consistent with the Baldwin Park General Plan Land Use Policy 1.4.
Re
garding Land Use Policy 1.4 (2) regional-serving retail commercial businesses that capture revenues from a broader population base”: the proposed commercial recreation, 5 soccer field soccer complex project is not an industrial or retail use, and therefore would not generate any tax dollars for the City, but it probably would “draw from a broader population base” such as soccer players from the Los Angeles area, who would be willing and able to drive all the way out to Baldwin Park to play at a 10 boutique 5x5 – soccer style complex facility, which would not be allowed to operate in their own west side Cities, because of the negative impacts
Therefore, based on the above statements, the proposed project is not consistent with the City of Baldwin Park General Plan. See Conditional Use Permit Finding of Fact 7. in this document for further discussion on General Plan Inconsistency.
153.200.200 CONSISTENCY WITH GENERAL PLAN
REQUIRED. (A) Notwithstanding anything else contained in this code or any rule or regulation of the city, but subject to the non-conforming use provisions of this subchapter, no permit of any kind shall be issued by or on behalf of the city for any use, building, structure, or business which is not consistent with the city’s General Plan, as adopted on November 20, 2002.
FINDINGS OF FACT - Conditional Use Permit CP 23-05 (pg. 4)
The applicant is requesting that the City of Baldwin Park approved a Conditional Use Permit to allow the construction and operation of an indoor and outdoor soccer facility complex in the Industrial (I) zone.
Baldwin Park Municipal Code 153.210.450
“The city recognizes that certain uses, due to the nature of the use, intensity or size, require special review to determine if the use proposed, or the location of that use, is compatible with surrounding uses, or through the imposition of development and use conditions, can be made compatible with surrounding uses. The conditional use permit is provided for this purpose and to ensure compatibility with zoning regulations and surrounding properties. “
Baldwin Park Municipal 153.210.090 (B)
“All applications for land use and development permits and actions shall be submitted to City Planner on a city application form, together with all fees, plans, maps, data, diagrams, photographs and any other required information to provide the Approving Authorities with adequate information on which to base decisions.”
Baldwin Park Municipal Code 153.210.090 (D)
“The Recommending or Approving Authority, as designated in Table 153.210.020, shall prepare a written report that includes recommendation on the approval, conditional approval or disapproval of the application, taking into account all supplemental application information, provisions of this chapter, other applicable provisions of this code, the General Plan and applicable state law
Baldwin Park Municipal Code 153.210.480 (Determination) “The Planning Commission may impose conditions and/or require guarantees for the conditional use permit to ensure compliance and to prevent adverse or detrimental impacts to the surrounding neighborhood. Conditional use permits shall be granted 11 when the Planning Commission determines that the proposed use or activity complies with all of the following findings.”
CP-23-05 Findings of Facts (pg.4)
Finding of Fact (1) Conditionally permitted. The use is conditionally permitted within the subject zone and complies with the intent of all applicable provisions of this chapter.
Planning Commission staff report states:
“The use is conditionally permitted within the subject zone and complies with the intent of all applicable provisions of the Municipal Code. Section 153.050.020 of the Commercial Zoning code conditionally permits recreational facilities (soccer facility) with an approval by the City’s Planning Commission”
This Finding of Fact (1) has not been made with this statement.
This Finding of Fact applies to compliance of the proposed soccer complex use with the entire City of Baldwin Park Zoning Code Chapter 153, not just section 153.050.020 (Use Regulations). This means that there are requirements in the Zoning Code Chapter that this application for a soccer complex facility is required to meet. However, this particular application does not meet some of these requirements and it entirely ignores other requirements. These unaddressed requirements pertain to the Land Uses Standards and Developmental Standards, such as: Parking requirements, Traffic/Circulation requirements, Noise Restrictions, Light/glare restrictions. Lot coverage restrictions and Setback Requirements.
A.Type of Proposed Use
There seems to be some confusion regarding the actual proposed use classification.
The project Initial Study (Exhibit IS) identifies the project as a “Soccer Training Facility with gym”. In the application letter, the project applicant calls the project “a soccer complex.” (Exhibit B)
The staff report calls the project a “recreational facility (indoor-outdoor soccer facility)”, however, staff has set the number of required parking spaces for the project at 39 spaces, based on an “Educational Institutions (b) elementary and secondary -private” use.”
The category of “Recreational facilities / Outdoor Facilities” would be the most appropriate designation as it would identify the unique, primary issue before the Planning Commission. This primary issue is, of course, the incompatibility and 12 intrusiveness of the proposed soccer complex’s 4 elevated, 25-foot-tall outdoor soccer fields, directly adjacent residential homes use.
Baldwin Park Municipal Code 153.010.020 (Purpose): “This Zoning Code is established to regulate the use of land within the city in an orderly manner consistent with the goals, objectives and policies of the Baldwin Park General Plan and to protect the public health, safety, comfort, welfare and general prosperity of the city and its residents through classifying, designating, regulating and restricting the use of land, buildings and structures.”
Per Table 153.050.020 Permitted Uses: Recreational Facilities such as “Health Clubs/gymnasiums”, or “Indoor facilities”, or “Outdoor facilities” may be permitted with a Conditional Use Permit in the Industrial zone. However, schools or “Educational Institutions, elementary and secondary (private) are not permitted in the Industrial Land Use zone under any circumstances. Therefore, the required number of Parking Spaces must be based on the allowed “Recreational Use” not on the illegal school use.
Table 153.050.020 Permitted Uses in the Commercial and Industrial Z0nes Permitted and Conditionally Permitted
Uses within Commercial and Industrial
Zones
P
CUP
A
–
Permitted use
Conditional use permit required
Accessory use
Use not allowed
Land Use C-1 C-2 F-C I-C I Additional
Regulations
Educational institutions
a. College, university, professional
b. Elementary and secondary (private)
c. Elementary and secondary (public)
d. Vocational and trade schools
--
--
P
--
CUP
CUP
P
--
--
--
P
--
CUP
CUP
P
CUP
CUP
--
P
CUP
153.040.030
153.040.030
153.040.030
Recreational facilities
a. Dance or martial arts studios
b. Health clubs and gymnasiums
c. Indoor facilities (billiards, bowling
alleys, etc.)
d. Outdoor facilities (batting cages, golf
courses, etc.)
P
--
--
--
P
CUP
CUP
--
--
CUP
CUP
--
--
CUP
CUP
CUP
--
CUP
CUP
CUP
153.120 part 5
Therefore, the question is: Is this an application for an “Educational Institution /elementary and secondary (private) use” requiring 13 parking spaces with applicant proposing 39 parking spaces; or is the application for a commercial Recreation facilities Health club and gymnasium/Outdoor Facilities use, which is allowed in the Industrial zone, but requires 152 parking spaces?
13 Without this clarification, the application before the Planning Commission does not comply with the intent of this applicable provision of the Baldwin Park Municipal Code chapter. The application needs to be clarified as to what the applicant is exactly proposing before the Planning Commission can even review the proposed project.
Therefore, since the proposed type proposed to operate on the industrial-zoned site is unknown (Recreation facilities Health club and gymnasium/Outdoor Facilities use vs Educational Institution), Finding of Fact 1 cannot be made that the proposed use complies with the intent of all applicable provisions of this chapter.
B. Required Number of Parking Spaces
Baldwin Park Municipal Code Chapter 153.150.040 Number of Parking Spaces. The minimum number of required parking spaces for a “Commercial Recreation Health / Fitness Club” designated use is based on the square footage of the entire building area, in this case: 22,888 square feet per the submitted site plan (Exhibit C). For each 150 square feet of building, one parking space is required, which in this case equals one hundred and fifty-two (152) parking spaces (see Table 153.150.040 below).
The submitted soccer complex application is proposing an insufficient thirty-nine (39) parking spaces (Exhibit C). This is erroneously based on an “Educational Institution /elementary and secondary (private) use”. An “Educational Institution /elementary and secondary (private) use” is not allowed in the industrial zone and therefore, the proposed number of parking spaces is based on a Use which is not even allowed in the Industrial zone.
Table 153.150.040 Required Number of Parking Spaces
Number of Required Parking Spaces
Land Use Minimum Number of Spaces Required
Commercial Recreation
a. Health/Fitness Club
b. Billiard / bowling alley
c. Arcade/internet cafe
a. 1 space/150 square feet of building
area (152 spaces required)
b. 3 spaces /100 square feet of building
area
c. 1 space/150 square feet of building
area
School
a. Elementary or secondary (private)
b. High School (private)
c. Specialized and vocational
a. 1 space/employee plus 1 space
classroom (13 spaces required)
b. 1 space/employee, plus 1 space/2
students in 11
th and 12th grades
c. 1 space/35 square feet devoted to
instructional services plus 1 space per
classroom (468 spaces required)
14 Therefore, since the proposed project will require 152 parking spaces and the applicant is only providing 39 parking spaces, Finding of Fact 1 cannot be made because proposed project will not comply with the intent of all applicable provisions of this chapter.
The Development Standards have two separate and distinct requirements regarding the size of a proposed structure to be constructed in the Industrial zone: a Lot Coverage requirement and Floor Area Ratio (FAR) requirement. Baldwin Park Municipal Code Chapter 153
C. Lot Coverage
Baldwin Park Municipal Code Chapter 153.040.030 deals with Site Development Standards requirements. The maximum amount of lot coverage in the Industrial zone allowed is 50%. The submitted soccer complex application is proposing a maximum lot coverage of 84%.
Table 153.050.030 Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I
Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I Additional
Regulations
Rear yard setback - minimum
lot adjacent to a residentially zoned lot
10 ft
10 ft
10 ft
10 ft
10 ft
153.130.030
153.050.030 (A) (2) Wherever a commercially or industrially zoned lot shares a property line with an exclusively residential or a mixed-use zoned lot, any exterior new structure, or addition to an existing structure, that exceeds one story in height and that faces any rear or side lot line shall be set back twice the required setback.
Lot coverage - maximum 50% 50% 50% 50% 50%
The existing building is to remain with a footprint of 6,813 square foot building, per page. T-1.0 of the submitted architectural plans (Exhibit C). The remaining area of the site will be almost completely covered by the 15,254 square foot second level supporting the four (4) elevated outdoor soccer fields, per page T-1.1 of the submitted site plans (Exhibit C).
Only a minimal 5-foot setback from the side and rear property lines and the area above the required “Fire Lane Parking” are planned to be left uncovered resulting in a proposed 84% lot coverage.
Per page T-1.0 of the submitted site plan (Exhibit C):
Combined Lot size = 26,244 sq. ft.
Proposed structure square footage is
6813 sq. ft existing building + 15,254 sq.ft. second level concrete slab structure for soccer fields and covered parking = 22,067 sq.ft.
15 22,067 sqft.total structure / 26,244 sq. ft. lot size = 0.84 or 84% lot coverage
• Note. The submitted site plans (Exhibit C). erroneously identifies the Lot Coverage as 25%. This 25% lot coverage calculation is based on the demolition of the existing building on 14424 Joanbridge Street, leaving the square footage of only the remaining 6813 square foot. building on 14412 Joanbridge Street.
6813 sq.ft. existing building / 26,244 sq.ft. total lot size = .259 or 25% Lot coverage is calculated on the proposed entire structure proposed to be built.
Therefore, since the allowable Lot Coverage in the Industrial zone is 50% and the proposed soccer complex facility Lot Coverage is 84%, Finding of Fact 1 cannot be made because the proposed project will not comply with the intent of all applicable provisions of this chapter, specifically Lot Coverage.
D. Floor Area Ratio (FAR)
The Floor Area Ratio (FAR) of the proposed soccer complex facility is larger than the allowable FAR for projects in the General Industrial land use designation area.
The project site is designated General Industrial per the City of Baldwin Park General Plan Land Use Map (Exhibit A). Therefore, the maximum allowable Floor Area Ratio (FAR) for the project site is 0.75 FAR per the City of Baldwin Park General Plan Land Use Table LU-1 Land Use Designations, below.
General Plan Land Use Policy 2.5: Land Use Intensity/Density (LU-23) “Table LU-1 lists each of the land use designations for the City and provides a corresponding indication of the maximum intensity / density of development on that parcel. Maximum allowable development on individual parcels of land is to be governed by these measures of intensity or density.” (Exhibit D)
Table LU-1 Land Use Designations
Land Use Designation Maximum Permitted
Density or Intensity Floor
Area Ratio ( FAR)
Average Density or
Intensity in FAR
(Floor Area Ratio)
Commercial-Industrial 1.00 FAR 0.30 FAR
General Industrial 0.75 FAR 0.45 FAR
Per Baldwin Park General Plan Land Use Designations, page LU-23: “State General Plan law requires a limit on the maximum permitted intensity of land use. For non- residential uses the floor-area ratio or FAR is used. The FAR describes the relationship between the total building area on a property and the size of the property. For example, a 10,000 square foot building on a 20,000 square foot lot yields an FAR of 0.5. Or given a FAR limit of 1.0 and a 20,000-square-foot lot, the maximum permitted building square footage would be 20,000 square feet.” (Exhibit D)
The subject property is 26,244 sq.ft. and using the 0.75 FAR, the maximum permitted building square footage would be 19,683 sqft
The total proposed building square footage being proposed is 23,529 sq.ft. 16 (6,625 sq.ft. [building first floor] + 1,650 sq.ft [building second floor] + 15,254 sq.ft. [concrete building slab for elevated soccer fields] = 23,529 sq.ft.)
The maximum permitted building square footage for the proposed project site with a .75 FAR is 9,683 sq.ft. of total building area.
The applicant is proposing a larger building of 23,259 sq.ft., which is a 0.88 FAR.
Since the Floor Area Ratio (FAR) of the proposed soccer complex facility is larger than the allowable FAR for projects in the General Industrial land use designation area and since the proposed size of the soccer complex facility is not consistent with the City of Baldwin Park, the proposed soccer complex facility is not allowed and therefore, Finding of Fact 1 cannot be made because the proposed project will not comply with the intent of all applicable provisions of this chapter, specifically Floor Area Ratio (FAR).
E. Setbacks
Baldwin Park Municipal Code Chapter Sections 153.050.030(A)2 and Table 153.050.030 of the Municipal Code, require a twenty-foot (20’) rear yard setback for new construction in the Industrial zone, when the rear yard setback abuts an existing residential use as it does in the proposed soccer complex facility. This is “to protect the adjacent residential homes from detrimental health and safety risks.”
Table 153.050.030 Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I
Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I Additional
Regulations
Rear yard setback - minimum
lot adjacent to a residentially zoned lot
10 ft
10 ft
10 ft
10 ft
10 ft
153.130.030
153.050.030 (A) (2) Wherever a commercially or industrially zoned lot shares a property line with an exclusively residential or a mixed-use zoned lot, any exterior new structure, or addition to an existing structure, that exceeds one story in height and that faces any rear or side lot line shall be set back twice the required setback.
Lot coverage - maximum 50% 50% 50% 50% 50%
The submitted soccer complex application is proposing a five-foot (5’) rear yard setback, for the four (4) new 25-foot tall, elevated outdoor soccer fields. Therefore, the proposed soccer complex facility does not meet Zoning Code Chapter Sections 153.050.030(A)(2) and Table 153.050.030 (of the Municipal Code Section and may not be constructed in the Industrial zone.
Therefore, since the required rear yard setback is twenty feet (20’) and the applicant is proposing a rear yard setback of five feet (5’) Finding of Fact 1 cannot be made because the proposed project will not comply with the intent of all applicable provisions of this chapter.
17 F. Noise
General Plan Land Use Policy 2.5: “Requi re that multi-family, commercial and industrial development provide adequate buffers (such as decorative walls and landscaped setbacks) at the designated boundaries with adjacent uses to prevent impacts on residences due to noise, traffic, parking, light and glare, and differences in scale; to ensure privacy; and to provide visual compatibility.”
Per
page A-1.3 of the submitted site plan, the applicant is proposing to use the existing six-foot-high concrete masonry wall along the southern perimeter of the Project Site and a meager, skinny, 5-foot landscape strip behind the wall. as a buffer. However, since the project wall at that location is 25’ tall and 150’ wide, with the four (4) soccer fields located on top of the second level, all the noise generated will not be stopped in the least by that short wall and will just pour down into the adjacent residential backyards, therefore rendering the buffer ineffective.
Baldwin Park Municipal Code 153.140.020 Performance Standards The performance standards in this subchapter shall apply to all new construction, renovation and alteration of existing uses or structures in all zone districts. Buildings and land uses shall not be used or constructed if they create a dangerous, noxious, fire, explosive or other hazard; noise or vibration; smoke, dust, odor, air pollution or glare; or liquid or solid wastes in amounts that adversely affect surrounding areas. These standards shall be applied in addition to the development standards required for each zone.
Baldwin Park Municipal Code 153.140.070 (A) “The regulations in this section aim to prohibit unnecessary, excessive and annoying noises from all sources, as certain noise levels are detrimental to the health and welfare of individuals. The standards apply to all land uses in all zones unless otherwise specified.”
Baldwin Park Municipal 153.140.070 NOISE (B) “Noise shall be measured with a sound level meter that meets the standards of the American National Standards Institute (ANSI Section S1.4-1979, Type 1 or Type 2). The unit of measure shall be designated as a decibel (dBA). Noise levels shall be measured in dBA at the property line of the receptor property and at least four feet above the ground and five feet from the nearest structure or wall. Where a boundary or wall exists, the measurement shall be made on the receptor property. A calibration check shall be made of the instrument at the time any noise measurement is made and at least four feet above the ground and five feet from the nearest structure or wall.”
In the case of the proposed soccer complex facility, any valid residential noise levels are therefore required to be taken on the receptor properties, which are the rear yards of those residential properties directly south and adjacent to the subject Industrial property’s rear lot line.” (Exhibit N)
18 Baldwin Park Municipal 153.140.070 NOISE (C).”Exterior noise standards.(1) No person shall create or allow the creation of noise that causes the exterior noise level to exceed the noise standards set forth in Table 153.140.070 (C).” See Table below.
TABLE 153.140.070 (C)
City of Baldwin Park Noise Standards
Zone Time Allowable Noise Level (dbA)
Noise Standards
Zone Time Allowable Noise Level (dbA)
Residential 7 a.m. - 7 p.m. (Day) 55
Residential 7 p.m. - 10 p.m. (Evening) 50
Residential 10 p.m. - 7 a.m. (Night) 45
Commercial 7 a.m. - 10 p.m. (Day and evening) 65
Commercial 7 p.m. - 7 a.m. (Night) 55
Industrial Anytime 65
As shown in Table 153.140.070 (C), above, the loudest allowable noise levels to be received by and recorded in a residential zone are:
55 dbA decibels during the Day (7 am – 7 pm)
50 dbA decibels during the Evening (7pm – 10 pm)
45 dbA decibels during the Night (10 pm – 7 am).
General Plan Noise Element NE12: “A n Acoustical Analysis will be required for projects that will generate noise potentially effecting sensitive receptors.”
An acoustical analysis Noise Monitoring Field Report, (Exhibit N) as shown below w as commissioned and submitted by the applicant as a requirement of the CEQA review for the proposed elevated soccer fields complex and included in the Initial Study attached to this proposal (Exhibit IS). However, although the Noise Monitoring Field Report was submitted to the Planning Commission as part of the Initial Study for their review , the Noise Monitoring Field Report was not provided to the Planning Commission and was not discussed in the staff report to the Planning Commission. The Resolution of Approval for the proposed project does not contain any Conditions of Approval specifically requiring the applicant to meet the Noise standards of the residential areas adjacent to the proposed soccer complex facility site.
19 Initial Study Noise Monitoring Field Report
Location Time Maximum
Recorded Noise
Level (dbA)
Average Recorded
Noise Level (dbA
Lab 5 soccer complex
facility
9740 Telfair Ave
Pacoima CA
6:00 pm (day) 91.8 dbA 60.5 dbA
Lab 5 soccer complex
facility
9740 Telfair Ave
Pacoima CA
7:00 pm (Evening) 78.3 dbA 60.5 dbA
The soccer complex noise levels were measured at Lab5 Pacoima, www.Lab5.com which was provided by the applicant as an example of an existing soccer complex facility similar to the proposed soccer complex facility. The Lab5 Soccer facility was identified by the applicant, as a good example of the noise levels generated by a soccer facility complex similar to the one they are proposing.
The noise levels measured at the Lab5 soccer complex location were taken on a Wednesday night in January (1/25/23). The noise recorded was:
an average noise level of 64.3 dBA (day), maximum noise level of 91.8 dBA (day) and an average noise level of 60.5 dBA (evening), maximum 78.3 dBA (evening).
The table below comparing the City of Baldwin Park Residential Noise Standards and the applicant’s Noise Study clearly shows that the average noise levels generated by the soccer complex facility exceed the allowable noise levels in a residential zone by 9.3 – 10.5 decibels. The maximum noise generated by Lab5 facility exceeded the allowable noise levels in a Baldwin Park residential zone by 28.3 - 36.8 decibels. Remembering that In the case of the proposed soccer complex facility, the Noise levels generated by the soccer complex facility are to be compared to the allowable of noise that may be received by the residential property, per Baldwin Park Municipal 153.140.070 NOISE (B. cited above.
Noise Comparison
City of Baldwin Park (Sec. 153.140.070) Existing Soccer Complex Residential
7am – 7 pm (day) 55 dBA
1/25/23 6:10 pm
41.9 - 91.8 dBA average 64.2 dBA
Residential
7 pm – 10 pm (evening) 50 dBA
1/25/23 7:00 pm
46.4 – 78.3 dBA average 60.5 dBA
The proposed soccer complex facility will therefore generate noise during both day and the evening hours of operation substantially above the allowed levels for a new use in an Industrial zone abutting an existing residential Zone thus making the proposed soccer complex facility not allowed to be constructed at the proposed location, per 20 Baldwin Park Municipal Code 153.140.020 Performance Standards, noted above, which states: “Buildings and land uses shall not be used or constructed if they create a dangerous, noxious, fire, explosive or other hazard; noise an illegal use at the proposed location.”
In addition, the generated noise was measured on a cold winter night when attendance is low at the soccer complex facility. No noise measurements were taken on a sunny spring or summer weekend day, when the attendance at a soccer complex facility would be very much higher and the noise generated also very much higher.
Per the applicant’s Noise Monitoring Field Report, there were no noise level measurements taken on the receptor properties, which are the rear yards of those residential properties directly south and adjacent to the subject Industrial property’s rear lot line, as required by Baldwin Park Municipal 153.140.070 NOISE (B). However, a noise reading was taken in the street on California Avenue in front of affected residences. (Exhibit N)
• Note: The Noise Monitoring Field Report was prepared as support for the Initial Study Environmental Checklist and draft Mitigated Negative Declaration submitted for this project. Although the Initial Study Noise Monitoring Field Report clearly shows that the proposed soccer complex facility will generate noise during both day and the evening hours of operation substantially above the allowed levels for a new use in an Industrial zone abutting an existing residential zone, on page 80 the Initial Study states; “As demonstrated in Table 14, the proposed exterior soccer noise levels would not exceed the daytime or evening exterior noise standards established in the City’s Noise Element or Section 153.140.017 of the Municipal Code.” There is no “Table 14” included in the Noise section of the Initial Study and this statement is false as clearly shown above.
Therefore, since the noise generated by the proposed soccer complex facility will exceed the allowable noise levels to be received by a residential property in a residential zone located adjacent to an Industrial zone, as shown on the Noise Monitoring Field Report which was submitted as part of the Initial Study for the project, Finding of Fact 1 cannot be made because the proposed project will not comply with the intent of all applicable provisions of this chapter.
G. Light and Glare
Baldwin Park Municipal Code 153.140.020 Performance Standards “The performance standards in this subchapter shall apply to all new construction, renovation and alteration of existing uses or structures in all zone districts. Buildings and land uses shall not be used or constructed if they create a dangerous, noxious, fire, explosive or other hazard; noise or vibration; smoke, dust, odor, air pollution or glare; or liquid or solid wastes in amounts that adversely affect surrounding areas. These standards shall be applied in addition to the development standards required for each zone.”
21 General Plan Land Use Policy 2.5: “Requi re that multi-family, commercial and industrial development provide adequate buffers (such as decorative walls and landscaped setbacks) at the designated boundaries with adjacent uses to prevent impacts on residences due to noise, traffic, parking, light and glare, and differences in scale; to ensure privacy; and to provide visual compatibility.”
Per
page A-1.3 of the submitted site plan, the applicant is proposing to use the existing six-foot-high concrete masonry wall along the southern perimeter of the Project Site and a meager and skinny, 5-foot landscape strip behind the wall. as a buffer. However, since the project wall at that location is 25’ tall and 150’ wide, any external field flood lights will be located above the 6-foot-tall wall, therefore rendering the buffer ineffective. In addition, the project site is directly adjacent to a residential homes neighborhood, which has a lower grade than the industrial properties, making these homes considerably lower than the project site. The 6-foot-tall existing block wall and the skinny, 5-foot landscape strip behind the wall are insufficient to protect the residents in the adjacent homes from the light and glare that the proposed soccer complex facility will generate. Also, one of the residences directly abutting the project site is the home a 30-year special needs son of the property owners (a son who has seizures triggered by loud noise and light glare) making the proposed 6’ tall wall an inadequate and ineffective buffer.
In addition, photos of
existing outdoor soccer complex facility lights were taken at the Lab5 Gardena soccer complex, which was used by the applicant as an example of a similar existing soccer complex facility for the noise study. similar to the proposed soccer complex facility (Exhibit L, Lab5 Pacoima and Gardena site photos). These photos show the type of lighting generally used to provide outdoor light bright enough to play nighttime outdoor sports safely. These over-sized, existing light standards extend far beyond the existing Gardena Lab 5 soccer complex fences and are very large. The submitted site plans do not show any outdoor field lighting on any of the exterior elevations as seen on pages A-1.3, A-1.4,and P-1.1 of the submitted site plans.
• Note. The location of 17 proposed second level flood lights were shown on pages E-2 of the plans for this project which were submitted to the Fire Department for their review. The height, size, wattage, light spread, glare level of the flood lights were not shown on these site plans. These site plans were not a part of the Design Review plans provided to the Planning Commission n or was the height, size, wattage, light spread, glare level of the flood light lighting fixtures discussed in the staff report, as they should have been in order to give the Planning Commission all the information needed to sufficiently review this project.
General Plan Land Use Policy 2.6: “Require that the external lighting of commercial and industrial properties be confined to the site to avoid adverse impacts on adjacent land uses due to light spillover or glare.”
22 In the required and submitted Initial Study, Mitigation Measure AES 1 (Exhibit MM), requires that “The Project Applicant shall submit additional documentation as part of the required Schematic Lighting Plan and the Applicant’s Design Review Submittal package to the City of Baldwin Park Design Review Committee for review and approval. Additional documentation shall demonstrate that the proposed lighting conditions under the Project shall not result in excessive spillage. Additional documentation may include, but is not limited to, photometric site plans and or written statements of approval by the City Engineer.”
The applicant has not submitted a Schemic Lighting Plan as part of the Design Review submittal to the City of Baldwin Park There is no plan to show that the lighting at the proposed commercial soccer complex will be confined to the site as required by General Plan Land Use Policy 2.6, possibly because any lighting plan that could provide enough external lighting to illuminate the 4 elevated soccer fields for night play, would not be able to meet this policy requirement.
Ins
tead of requiring the applicant to submit a Schemic Lighting Plan, as required by Mitigation Measure AES 1., the Planning Department has instead provided Planning Design Review Condition of Approval (i), Attachment #2 Resolution of Approval – PC 23-
28. This substitute condition postpones the submittal and review of any Schemic Lighting Plan until after the Planning Commission has already rendered it s decision on the project’s Design Review; after the Planning Commission has already deliberated and determined that the proposed soccer complex facility will or will not comply with General Plan Land Use Policies 2.5, 2.6 and Municipal Code 153.140.020 cited above.
This postponement, besides being in direct conflict with Mitigation Measure AES 1, is also in direct conflict with Baldwin Park Municipal 153.020.030 RESPONSIBILITIES OF THE PLANNING COMMISSION:
“The Planning Commission shall have the following responsibilities: (C) Conditional use permits and variances. Hear and act upon applications for conditional use permits and variances.” The Planning Commission cannot “act upon” this application unless they have all the pertinent facts. Condition of Approval (i) also denies the Planning Commission and the Public the opportunity to determine if the proposed exterior flood- lights needed for night play can even meet the requirements of the Initial Study.
In
addition, the Initial Study noted that “implementation of Mitigation Measure AES -1 would reduce the Project’s impacts involving substantial light and glare to less than significant levels”, based on the specific provision that the project applic ant shall submit additional documentation as part of the required Schematic Lighting Plan and the Applicant’s Design Review submittal package”.
Without the Planning Commission being allowed to review the required Schemic Lighting Plan and without the Planning Commission’s determination that “the proposed lighting conditions under the Project shall not result in excessive spillage”, the project cannot be approved with a Mitigated Negative Declaration of Environmental Impact.
23 Since the light and glare that would be generated by the proposed soccer complex facility cannot be shown to be buffered or that “the proposed lighting conditions under the Project shall not result in excessive spillage”, Finding of Fact 1 cannot be made because the proposed project will not comply with the intent of all applicable provisions of this chapter.
Additionally, the CEQA required Schemic Lighting Plan has not been provided to the Planning Commission for review and approval, as required by Mitigation Measure AES-1, therefor the proposed project cannot be approved with a Mitigated Negative Declaration of Environmental Impact. Therefore, the project will not comply with the intent of all applicable provisions of this chapter or CEQA..
H. Privacy
General Plan Land Use Policy 2.5: “Requi re that multi-family, commercial and industrial development provide adequate buffers (such as decorative walls and landscaped setbacks) at the designated boundaries with adjacent uses to prevent impacts on residences due to noise, traffic, parking, light and glare, and differences in scale; to ensure privacy; and to provide visual compatibility.”
Per
page A-1.3 of the submitted site plan, the applicant is proposing to use the existing six-foot-high concrete masonry wall along the southern perimeter of the Project Site and a meager and skinny, 5- foot landscape strip behind the wall . as a buffer. However, the project site is directly adjacent to a residential homes neighborhood, which has a lower grade than the industrial properties, making these homes considerably lower than the project site.
The existing 6-foot-tall block wall and a skinny, 5-foot strip of landscaping are insufficient to protect the privacy of the residents in the adjacent homes as shown in the attached photos of the affected residential rear yards. (Exhibit E). The existing 6-foot-tall wall will not prevent intrusions of trash, noise and most importantly, will not prevent intrusions into every resident’s expectation of personal privacy when in their own back yard.
Not only can everyone and anyone in the parking areas easily look down into the adjacent, supposedly private, residential rear yards, but anyone and everyone standing on the 25 foot tall, elevated soccer fields can, even easier, look through the mesh screening which is proposed for the rear wall of the elevated structure, directly down into the supposedly private back yard of the adjacent residents.
It has been shown that the privacy of the adjacent residential rear yards would not be protected by the existing, ineffectual, 6 foot-tall block wall or by the proposed trees to be planted in the 5 foot meager landscape strip behind the wall, and the lack of privacy caused by the proposed soccer complex facility cannot be buffered. Therefore, Finding of Fact 1 cannot be made, because the proposed project will not comply with the intent of all applicable provisions of this chapter.
I.
Visual Compatibility
24 General Plan Land Use Policy 2.5: “Require that multi-family, commercial and industrial development provide adequate buffers (such as decorative walls and landscaped setbacks) at the designated boundaries with adjacent uses to prevent impacts on residences due to noise, traffic, parking, light and glare, and differences in scale; to ensure privacy; and to provide visual compatibility.” The proposed buffer wall would also be woefully entirely inadequate to protect all the residents from the 7 days-a-week noise, light and glare, or to protect their privacy or provide visual compatibility
Per
page A-1.3 and A-1.4 of the submitted site plan, the applicant is proposing to use the existing six-foot-high concrete masonry wall along the southern perimeter of the Project Site and a meager and skinny, 5-foot landscape strip behind the wall, to hide the fact that the proposed urban design of the prison- like proposed structure is in no way visually compatible with the residential neighborhood and homes located directly adjacent to the project site.
These submitted rear elevation drawings appear with deceptively large trees added to camouflage the fact that the flat, 25- foot-tall rear wall of the proposed soccer complex facility structure will be tremendously intrusive. Since the applicant is proposing only a meager and skinny, 5- foot-wide landscape buffer, the fact that the applicant is showing huge, mature 20 to 25-foot-tall trees to be planted in that small size planter strip is ludicrous and deceptive. The 5-gallon saplings, which would be the largest size tree to be able to fit in the area of a 5 foot wide landscape strip, couldn’t even be seen over the existing 6-tall block wall.
Planning Conditions of Approval (p) requires that:
“The number, variety and size of the
trees proposed on the south side of the development” (the rear property line elevation as shown on page A-1.3 and A-1.4 of the submitted site plans) “intended for screening use shall be selected appropriately to achieve this objective.” Which begs the question:
Appropriately to screen or appropriate for the miniscule size of the planting area? Unfortunately, that decision is not to be made in consultation with the Planning Commission, although the Planning Commission would be held responsible for approving a deceptive site plan rear elevation.
The
huge difference in scale and design between the proposed blocky, monolithic, prison–like, two-story soccer complex facility building, situated a mere 5 feet from the rear property line of the adjacent small, single story residential homes it is l ooming over, is unsurmountable and unacceptable.
It has been shown that the exceeding differences in scale and the visual in- compatibility of the proposed soccer complex facility with the adjacent residential homes would not be buffered by the existing, ineffectual, 6 foot-tall block wall or any plantings in the skinny landscape strip behind the wall. Therefore, Finding of Fact 1 cannot be made, because the proposed project will not comply with the intent of all applicable provisions of this chapter.
25 Therefore, the Finding of Fact (1) Conditionally Permitted: “The use is conditionally permitted within the subject zone and complies with the intent of all applicable provisions of this chapter” has not been and cannot be made because:
a. The Conditional Use requested (Recreational facility / Outdoor Facility) is not the use being used to calculate the required number of parking spaces resulting in too little parking being provided, i.e. a parking deficit, for the proposed soccer complex facility use, which does not comply with the intent of the applicable provision of Chapter 153 Baldwin Park Municipal Code; and b. The proposed number of parking spaces, 39, is less than the required number of parking spaces, which is 152; and
c. The proposed soccer complex facility does not meet the City of Baldwin Park Table 153.050.030 Development Standards for Commercial and Industrial Zones, proposing a 81% lot coverage when only a 50% lot coverage is allowed.
Therefore, the size of the proposed soccer complex structure will cover more than the allowed lot coverage and the size is not allowed; and d. The proposed Floor Area Ratio (FAR) of .88 is greater than the allowed .75 FAR. in the General Industrial designation of the General Plan. e. The submitted soccer complex application is proposing a 5-foot (5’) rear yard setback for the four (4) new 25-foot tall, elevated outdoor soccer fields when a 20-foot (20”) rear yard setback is required for new construction in the Industrial zone when the rear property line abuts an existing residential zone and neighborhood. Therefore, the proposed soccer complex facility does not meet Zoning Code Chapter Sections 153.050.030 and 153.050.030 (A)(2) of the Municipal Code Section and is not permitted to be constructed in the Industrial zone; and
f. That the noise that will be generated by the requested conditionally approved Recreational facility / Outdoor use is not in compliance with the General Plan Noise Element NE12 requiring an Acoustical analysis for proposed projects that will generate noise potentially effecting sensitive receptors. There was no Acoustical Analysis presented to the Planning Commission for their review and approval; and
g. That the noise that will be generated by the requested conditionally approved Recreational facility / Outdoor use is not in compliance with the intent of all applicable provisions of this chapter, specifically the Zoning Code Section 153.140.070 NOISE, and is in fact prohibited; and
h. That the light and glare created by the proposed twenty-five (25’) foot tall exterior flood lights of the proposed soccer complex facility cannot be shown, without a Schemic Lighting Plan as required by Mitigation Measure AES 1, to be confined to the site and will cause adverse impacts on adjacent residential land uses due to light spillover and glare; and
i. That the privacy of the adjacent residential rear yards would not be buffered or protected by the existing, ineffectual, 6 foot-tall block wall or the proposed 5 foot meager landscape strip behind the wall; and
26 j. That the differences in scale and the visual in-compatibility of the proposed soccer complex facility with the adjacent residential homes would not be buffered or protected by the existing, ineffectual, 6 foot-tall block wall or any plantings in the skinny landscape strip behind the wall. The lack of visual compatibility and exceeding differences in scale between the proposed soccer complex facility and the adjacent residential, small, single-story homes cannot be buffered.
Finding of Fact (2) Zone integrity and character. The use will not impair the integrity and character of the zone in which it is to be located. (pg.4)
Planning Commission staff report (pg4):
“The use will not impair the integrity and character of the zone in which it is to be located. The property is located within the Industrial Zone which allows for uses that provide a broad range of retail, office, and service-oriented commercial uses designed to meet the needs of both the local and residential and business communities.
Furthermore, the use will occupy a large tenant space that is currently vacant.
Therefore, an indoor/outdoor soccer training facility at the subject location compliments the integrity and character of the zone;”
The Finding of Fact has not been met that the use will not impair the integrity and character of the zone in which it is to be located.
The proposed use will negatively impair the integrity and Industrial character of the industrial zone in which it is to be located in that it is neither a retail or office use. It also is not a “service-oriented commercial use designed to meet the needs of both the local and residential and business communities”, such as a FedEx Copy Store or Office Depot which would offer a commercial service to the local communities. Customer of the adjacent Tombstone manufacturing and sales will not be utilizing the “members only” boutique 5x5-style soccer-style complex .
The proposed recreational soccer complex is a commercial business which would be primarily used by persons willing to pay the very high membership fees of a commercial, boutique 5x5 soccer-style soccer complex facility. The proposed business not proposed to be a free or low-fee City recreational facility for residents. The soccer complex facility would not service the local Industrial business, but rather be a destination point for out- of-town soccer players who are interested in playing the 5x5 soccer style games.
Also, the proposed use will negatively impair the integrity and character of the industrial zone through increased traffic and inadequate parking, noise, trash generated and light glare. Joanbridge Street is designed to accommodate low amounts of industrial business truck and car traffic and to provide minimal on-site parking for the existing industrial use only.
27 There is no on-street parking allowed on Joanbridge Street and minimal parking is provided for each individual industrial business only. There are “no parking” and “employee only parking” signs posted at almost every business on Joanbridge Street.
The proposed soccer complex would generate a large influx of cars and people searching for on-site parking and since it is not provided on-site, the demand for on- street parking will overwhelm the already limited on-street parking areas, eliminating available parking for the existing Industrial uses and their employees and customers.
The existing industrial businesses will also be subject to increased street trash left by the patrons of the soccer complex (Exhibit L Gardena Lab5 trash photo), as well as increased noise and increased traffic generated by the proposed soccer complex.
All of these negative impacts support the fact that there are reasons that the proposed use will negatively impair the integrity and character of the zone in which it is to be located.
Therefore, the Finding of Fact (2): “The use will not impair the integrity and character of the zone in which it is to be located” has not been and cannot be met.
Finding of Fact (3) Site suitability. The subject site is physically suitable for the type of land use being proposed.(pg.4)
Planning Commission staff report (pg.4)
“The subject site is physically suitable for the type of land use being proposed. The subject site will maintain two driveway approaches from (sic) ingress and egress from the soccer training facility, therefore the site is suitable for a recreational facility.”
The Finding of Fact cannot be met that the subject site is physically suitable for the type of land use being proposed.
The fact that the site will re-use the existing two driveways to the subject property does not make the site suitable for a soccer complex facility, primarily catering to 5x5 soccer play fans and out of town supporters.
The site is too small for the proposed soccer complex to be designed with adequate on- site circulation. The architect has been forced to use only one-way traffic circulation, which is confusing and dangerous. The site is so small that the applicant has resorted to locating the required Fire Department access route and parking area directly in the exit lane. This design will lead to confusion and blocked routes of exit for anyone on the site in the case of an emergency.
Second, the proposed over-sized soccer complex facility with 81% lot coverage also exceeds the 50% maximum lot coverage allowed by the City of Baldwin Park Municipal 28 Code Section 153.050.030 in the Industrial zone, see previous Table 153.050.030 on page 4 this document, above.
Third, the subject site is physically not suitable for the type of land use being proposed because while the existing Industrial buildings were built with the required 20-foot rear yard setbacks to protect the adjacent residential homes from detrimental health and safety risks (see 153.050.030(A)(2) and Table 153.050.030 on page 4 of this document), as required by the Municipal Code, the applicant is requesting a five foot (5’) rear yard setback because the subject site is not large enough to build the proposed soccer complex without it. This is a major setback variance of fifteen (15’) feet or 75% setback reduction. In addition, this major Variance is not explained, clarified, or presented in the applicant’s proposal.
The proposal to construct the 4 huge, 25-foot-tall elevated soccer complex facility playing fields on the second floor, to within 5 feet of the homes of Baldwin Park residents, is too big and too unsuitable for the site.
Therefore, the Finding of Fact (3): “The subject site is physically suitable for the type of land use being proposed” has not been and cannot be met.
Finding of Fact (4) Existing compatibility. (pg.4)The use is compatible with any land uses presently on the subject property.
Planning Commission staff report (pg.4)
“The use is compatible with any land uses presently on the subject property. The proposed recreational facility provides a complimentary service to customers that are visiting the existing Industrial area. The use is also compatible with the Industrial land uses adjacent and in proximity to the subject site given that the surrounding businesses are approved for indoor manufacturing and service uses.”
With the demolition of one of the existing buildings on the subject property, there will be no other land uses on the site with which to be compatible. However, regarding the staff report comments that the proposed recreational facility provides a complimentary service to customers that are visiting the existing Industrial area, a soccer complex facility has nothing to offer the customers of the adjacent tombstone manufacturer /sales business on the west side and nothing in common with the adjacent and existing auto body repair and light manufacturing businesses on the east side. The proposed soccer complex facility will only negatively affect the surrounding businesses with the increased traffic, noise and generated trash. There is no evidence that the adjacent land uses on the site are compatible of the proposed soccer complex just because adjacent uses are “approved for indoor manufacturing”.
29 The Finding of Fact has not been met that the project use, a 5 soccer field soccer complex project, with 4 elevated outdoor soccer fields and one inside soccer field, is compatible with any land use presently on the subject property.
In addition, the applicant is proposing to re-use the remaining existing 2-story building in a manner which is incompatible with its originally designed industrial use. The increased hours of operation, the increased traffic congestion, the increased noise, new light glare and additional trash which will be generated by the proposed soccer facility complex, will not be compatible with the existing Industrial business uses listed above.
The industrial businesses on Joanbridge Street have done a good job of maintaining their own properties and work too hard to conduct their own companies profitably, to have to be subjected to the nuisances of the proposed use. Nuisances such as increased traffic, unlawful on-street parking, and increased trash left in the area by patrons of the soccer complex facility, as exampled the photos taken outside the Lab5 Gardena (Exhibit L Lab5 Gardena photos) along with increased traffic congestion.
In addition, the adjacent residential neighborhood homes will also be subject to the detrimental effects of the proposed soccer complex’s long hours of operation, the extreme noise generated, the tremendous light glare into their yards and windows, the trash left in the neighborhoods by the soccer complex’s clients, as well as the increased traffic congestion and strangers in their neighborhood, which will all be generated by the proposed soccer facility complex.
Therefore, the Finding of Fact (4): “The use is compatible with any land uses presently on the subject property” has not been and cannot be met.
Finding of Fact (5) Future compatibility. The use will be compatible with existing and future land uses within the zone and the general area in which the proposed use is to be located. (pg.4)
Planning Commission staff report (pg.4)
“The use will be compatible with existing and future land uses within the zone and the general area in which the proposed use is to be located. The use of the property as a recreational facility is compatible with existing and future land uses within the Industrial zone, and the general area in which the use is located. Future uses with potential impacts typically require approval of a Conditional Use Permit and therefore would be before the Planning Commission for consideration of the cumulative impacts for the area.”
The Finding of Fact has not been met that the use will be compatible with existing and future land uses within the zone and the general area in which the proposed use is to be located.
30 The proposed soccer complex facility use is not compatible with the existing industrial uses in the Industrial zone because of the noise issue noted previously document; because of trash problems as documented in the Exhibit L - Lab5 Gardena; because of the light / glare problems as discussed in Section “Finding 1a – 1j” of this document and as shown in the Lab5 Gardena soccer complex (Exhibit L), and primarily because of the traffic /parking problems it will generate.
As part of the applicant’s Initial Study data for the proposed project, the applicant submitted a Traffic Study of a similar soccer complex (www.Lab5.com Pacoima) which was not included in the staff report or in the CUP discussion.
Per this Traffic Study (Exhibit T), the proposed new soccer complex facility would generate 107 trips (or 21.375 trips per field) during a 4 pm – 10pm time period on a weekday. It can be extrapolated that the traffic generated by the soccer complex facility would be even higher during the day on a weekend.
This high traffic volume generated by the proposed soccer complex use would clog and aggravate the already difficult turn lanes onto Joanbridge St. from Maine Avenue, and the right / left turn lanes from Joanbridge Street onto Maine Avenue. This new, extra heavy traffic would impede the customer and delivery truck accessibility to the existing industrial and commercial uses, negatively affect their ability to conduct business
More importantly, the proposed Commercial Recreation soccer complex is not compatible currently with the existing and future land uses in the general area because the general area encompasses existing adjacent residential homes.
The negative impacts of the noise, light glare, trash and traffic/parking problems associated with the proposed soccer complex will be even more detrimental to residential homes.
Furthermore, the proposed Commercial members-only, soccer complex facility will never be considered compatible even in the future, based on the fact that a Commercial Recreational Facility soccer complex facility is not allowed in a residential zone, per the City of Baldwin Park General Plan and Municipal Code.
Therefore, the Finding of Fact (5): “The use will be compatible with existing and future land uses within the zone and the general area in which the proposed use is to be located has not been and cannot be met.
Finding of Fact (6) Utilities and services. Adequate provisions for water, sewer and public utilities and services are available to ensure that the use will not be detrimental to public health and safety. (pg.5)
Planning Commission staff report (pg.5)
31 “Adequate provisions for water, sewer and public utilities and services are available to ensure that the use will not be detrimental to public health and safety. The existing industrial building provides all utilities and services connected and therefore the proposed recreational facility will not be detrimental to public health and safety.”
The Finding of Fact has not been met that adequate provisions for water, sewer and public utilities and services are available to ensure that the use will not be detrimental to public health and safety.
The subject property of the proposed soccer complex is bisected by multiple large power lines with transformers as well as other utility lines. These utility structures are located directly where the applicant is proposing to construct the elevated concrete structure as a foundation for the four (4) outdoor, raised soccer complex facility fields.
There are is no discussion in the staff report that the applicant has submitted any plans to the appropriate Utilities or the Baldwin Park Engineering Department regarding the feasible relocation and undergrounding as per Baldwin Park Municipal Code 153.140.050 (B) Underground utilities. “To protect public safety and improve the appearance of the community, all new development shall be required to install all electrical distribution lines of 16 kilovolts or less, telephone, cable television and similar wires that provide customer services underground.”There are no specific Conditions of Approval included within Conditional Use Permit Resolution which have been submitted regarding the relocation or required undergrounding of theses existing utilities.
In addition, the public services of the Police Department, Fire Department and the Code Enforcement Department will be negatively impacted by the operation of the proposed soccer complex facility. Increased service calls to the Police and Fire and Code Enforcement Departments from the proposed soccer complex would increase the response time of these necessary health and safety services.
There are no specific Conditions of Approval submitted by the Police Department included within the draft Conditional Use Permit Resolution because they have not had the opportunity to review and comment on the proposed soccer complex facility.
Therefore, these entities have not been able to submit conditions of approval to ensure that the proposed soccer complex will not be detrimental to public health and safety.
Therefore, the Finding of Fact (6): “Adequate provisions for water, sewer and public utilities and services are available to ensure that the use will not be detrimental to public health and safety” has not been and cannot be met.
Finding of Fact (7): Public access. Adequate provisions for public access are available to serve the use (pg.5)
32 Planning Commission staff report (pg.5):
“Adequate provisions for public access are available to serve the use. The site has direct vehicular and pedestrian access to Joanbridge Street, which is a local road, but is also proximate to Main Avenue which is designated as an collector street in the City’s General Plan. Additionally, the rolled curb in the public right-of-way provide both pedestrians and persons with disabilities with convenient access to the site and provide access for motor vehicles. The site’s access to streets and highways are adequate in width and pavement type to carry the quantity of traffic generated by the proposes recreational facility, and”
The Finding of Fact has not been made tha t the project would provide adequate public access for the proposed 5 soccer field soccer complex project, with 4 elevated outdoor soccer fields and one inside soccer field.
The proposed soccer complex facility does not meet the requirements of the Baldwin Park Municipal Code 153.150.010 which is to “ensure that all land uses in the city provide adequate off-street parking facilities, loading areas and vehicle movement areas; that the use of land does not adversely interfere with the circulation on public rights-of-way; that private on-site circulation does not pose potential safety issues; and that surrounding uses are insulated from noise and traffic impacts associated with off- street parking and loading activities.”
1. The applicant is proposing to use a single ingress drive aisle and a single exit drive aisle, with only one-way traffic circulation, which is confusing and dangerous. The proposed public access ingress and egress are inadequate and dangerously designed, due to the small size of the subject property and due to the fact that the project is proposing to reducing the required twenty-foot (20’) rear yard setback to a five-foot rear yard setback (a 75% reduction) (see Setback discussion of this document) and the project is proposing to cover 84% of the industrial instead of being below the required 50% lot coverage (see Lot Coverage discussion of this document). This will lead to the over-development of the existing Industrial parcel by the proposed soccer complex facility.
2. In addition, again due to the small lot size and proposed over-development, the applicant is proposing to place the required Fire Department parking lane and access route directly within the exit lane. This would lead to great confusion and blocked routes of exit for anyone on the site in the case of an emergency.
3. T he application for the proposed 5 soccer field soccer complex project, with 4 elevated outdoor soccer fields and one inside soccer field has not been submitted to the Engineering Department for their review or approval.
4. The amount of proposed parking spaces does not meet the Baldwin Park M unicipal
Code requirements for a Commercial Recreational Use per Table 153.150.040 Required Number of Parking Spaces, as shown on page 3 of this document. The applicant is proposing to provide 39 parking spaces for the proposed new soccer complex, however 152 parking spaces are required per code (see Parking discussion of this document).
33 Also, as part of the applicant’s Initial Study data for the proposed project, the applicant submitted a Traffic Study (Exhibit T) of a similar soccer complex (www.Lab5.com Pacoima) which was not included in the staff report or in the CUP discussion. Per this Traffic Study, Exhibit T, the proposed new soccer complex facility would generate 107 trips (or 21.375 trips per field) during a 4 pm – 10pm time period on a weekday.
Considering the low amount of on-site parking proposed by the applicant, all soccer complex facility customers seeking parking spaces at the proposed new soccer complex would spill onto Joanbridge St. and the adjacent residential streets of Maine Avenue and California Avenue seeking non-existent street parking, causing traffic blockage on Maine Avenue, on Joanbridge St. and California Avenue, and reducing public access to the residences and reducing public access to the businesses on Maine Avenue . (Exhibit MM Mitigation Measure TRA-1).
The additional high traffic volume generated by the proposed soccer complex use would also clog and aggravate the already difficult turn lanes onto Joanbridge St. and California Avenue from Maine Avenue, and the right / left turn lanes from Joanbridge Street, California Avenue and even Baldwin Avenue, onto Maine Avenue.
The residential areas on Maine Avenue, California Avenue and Baldwin Avenue would be especially negatively impacted. The fact that California Avenue and Baldwin Avenue are dead-end streets would only add to the traffic congestion and confusion as soccer players and spectators and family all try to find off-site parking.
In addition, in their application letter (Exhibit B), the applicant is proposing to operate (3) 2-hour classes per day, seven (7) days a week, on each of the 5 soccer fields. The soccer fields are designed for 5x5 soccer play or a maximum of 10 students/team members on each field with an instructor/referee. That is a total of 55 people per field every 2 hours, 3 times a day, 7 days a week, not including spectators, family members and those waiting for their time on the field. That is a minimum of 165 people per day trying to park in the proposed 39 parking spaces. This huge amount of cars/soccer players seeking parking is confusing and dangerous to anyone who would want to park at the soccer complex facility and would reduce public access to the businesses on Joanbridge Street.
The traffic generated by a similar type of soccer complex facility in Covina is the SOFIVE commercial soccer complex located at 699 S. Barranca Avenue, Covina (www.sofivecovina.com) is a clear example of the negative effects a soccer complex will have on existing businesses and residential areas. Existing businesses and residential next to the SOFIVE commercial soccer complex facility in Covina have resorted to blocking their residential streets and blocking their commercial business parking lot entrances with “no SOFIVE soccer parking” in order to preserve their own residential and commercial parking spaces. Complaints to the Covina Police and Code enforcement have increased at this Covina location.
34 Therefore, the Finding of Fact (7): “Adequate provisions for public access are available to serve the use” has not been and cannot be met.
Finding of Fact (8) General Plan consistency. The use is consistent with the General Plan.(pg.5)
Planning Commission staff report (pg.5):
“The use is consistent with the General Pla. Land Use Goal1.0 Balanced Development in Baldwin Park. Maintain a balanced mix and distribution of land uses throughout Baldwin Park. Land Use Policy 1.4 Create opportunities for two different levels of commercial development: (1) commercial uses that meet the retail and service needs of the local residents and employee populations, and (2) regional-serving retail commercial businesses that capture revenues from a broader population base; and
The Finding of Fact has not been made that the project is consistent with the General Plan.
The
staff report doesn’t clarify how constructing a 5-soccer field soccer complex project, with 4 elevated outdoor soccer fields, increased noise, light glare, increased trash, increased traffic and parking problems next to an existing residential use is a “Balanced Development.” The intention of Land Use Goal 1.0, to “maintain a balanced mix and distribution of land uses throughout Baldwin Park” is not to locate a nuisance- generating, 5-soccer field soccer complex facility project next to an existing residential use. If that was the intention of the Baldwin Park General Plan, then the Baldwin Park Municipal Code would allow a commercial recreational facility in a residential zone, which it does not.
Regarding Land Use Policy 1.4, “Create opportunities for two different levels of commercial development”; the subject site is located in an Industrial zone, not in a zone for commercial uses or commercial development. The Industrial zone properties are zoned such so as to provide the City of Baldwin Park with manufacturing uses to generate a manufacturing tax base of income for the City.
Additionally, regarding Land Use Policy 1.4 (2) “regional-serving retail commercial businesses that capture revenues from a broader population base”: the proposed commercial recreation, 5 soccer field soccer complex facility project is not a retail use, but it probably would “draw from a broader population base” such as soccer players from the Los Angeles area, who would be willing and able to drive all the way out to Baldwin Park to play at a boutique 5x5 – soccer style complex facility, which would probably not be allowed in their own Cities, because of the negative impacts.
Therefore, the Finding of Fact (8): “The use is consistent with the General Plan” cannot be made.
However, there are many General Plan Goals and Policies which require the denial of the proposed project:
35 1.General Plan Land Use Goal 2.0: “Accommodate new development that is compatible with and complements existing conforming land uses.”
The proposed soccer complex would be constructed directly adjacent to an e xisting residential land use, the homes of actual Baldwin Park residents. The homeowners and residents would be very negatively affected, financially and aesthetically, by the proposed over-development of the adjacent Industrial property with the construction of the proposed commercial soccer complex, with 4 outdoor, elevated soccer fields along with the noise, light glare, traffic / parking problems and trash such a project would generate. The proposed soccer complex project is neither compatible with or complementary to the existing conforming residential land use adjacent to the property. Therefore, the proposal is directly in conflict with General Plan Goal 2.0.
2.General Plan Land Use Policy 2.5: “Require that multi -family, commercial and industrial development provide adequate buffers (such as decorative walls and landscaped setbacks) at the designated boundaries with adjacent uses to prevent impacts on residences due to noise, traffic, parking, light and glare, and differences in scale; to ensure privacy; and to provide visual compatibility.”
The proposed commercial soccer complex facility, with 4 outdoor, elevated soccer fields and one indoor soccer field is not consistent with General Plan Land Use Policy 2.5 as shown below
a. The Conditional Use requested (Recreational facility / Outdoor Facility) is not the use being used to calculate the required number of parking spaces resulting in too little parking being provided, i.e. a parking deficit, for the proposed soccer complex facility use, which does not comply with the intent of the applicable provision of Chapter 153 Baldwin Park Municipal Code; and b. The proposed number of parking spaces, 39, is less than the required number of parking spaces, which is 152; and
c. The proposed soccer complex facility does not meet the City of Baldwin Park Table 153.050.030 Development Standards for Commercial and Industrial Zones, proposing a 84% lot coverage when only a 50% lot coverage is allowed.
Therefore, the size of the proposed soccer complex structure will cover more than the allowed lot coverage and the size is not allowed; and d. The proposed Floor Area Ratio (FAR) of .88 is greater than the allowed .75 FAR. in the General Industrial designation of the General Plan. e. The submitted soccer complex application is proposing a 5-foot (5’) rear yard setback for the four (4) new 25-foot tall, elevated outdoor soccer fields when a 20-foot (20”) rear yard setback is required for new construction in the Industrial zone when the rear property line abuts an existing residential zone and neighborhood. Therefore, the proposed soccer complex facility does not meet Zoning Code Chapter Sections 153.050.030 and 153.050.030 (A)(2) of the Municipal Code Section and is not permitted to be constructed in the Industrial zone; and
36 f. That the noise that will be generated by the requested conditionally approved Recreational facility / Outdoor use is not in compliance with the General Plan Noise Element NE12 requiring an Acoustical analysis for proposed projects that will generate noise potentially effecting sensitive receptors. There was no Acoustical Analysis presented to the Planning Commission for their review and approval; and
g. That the noise that will be generated by the requested conditionally approved Recreational facility / Outdoor use is not in compliance with the intent of all applicable provisions of this chapter, specifically the Zoning Code Section 153.140.070 NOISE, and is in fact prohibited; and
h. That the light and glare created by the proposed twenty-five (25’) foot tall exterior flood lights of the proposed soccer complex facility cannot be shown, without a Schemic Lighting Plan as required by Mitigation Measure AES 1, to be confined to the site and will cause adverse impacts on adjacent residential land uses due to light spillover and glare; and
i. That the privacy of the adjacent residential rear yards would not be buffered or protected by the existing, ineffectual, 6 foot-tall block wall or the proposed 5 foot meager landscape strip behind the wall; and
j. That the differences in scale and the visual in-compatibility of the proposed soccer complex facility with the adjacent residential homes would not be buffered or protected by the existing, ineffectual, 6 foot-tall block wall or any plantings in the skinny landscape strip behind the wall. The lack of visual compatibility and exceeding differences in scale between the proposed soccer complex facility and the adjacent residential, small, single-story homes cannot be buffered.
The applicant is proposing to use the existing six-foot-high concrete masonry wall and a 5 foot narrow strip of landscape area along the southern perimeter of the Project Site to buffer the adjacent residential homes. However, these homes have a lower grade than the industrial properties, making these homes considerably lower than the project site.
The existing 6 foot tall proposed block wall and the 5 foot narrow strip of landscape area behind it are woefully insufficient buffers which would fail to protect the residents in the adjacent homes. As one of the residences directly abutting the project site is the home a 30-year special needs son of the property owners (a son who has seizures triggered by loud noise and light glare) this is completely unacceptable. The existing wall and minimal landscaping would also be inadequate to protect all the residents from the 7 days-a-week noise, light and glare, or to protect their privacy or provide visual compatibility , see previous discussions in Section Finding of Fact 1. in this document.
In addition, the applicant is requesting approval of a City Variance to allow all structures to encroach into the rear yard setback to within 5 feet of the rear property line, adjacent to the residential home properties, even though the Baldwin Park Munici pal Code
53.050.030 specifically requires a 20- foot setback for all new structures built in the Industrial zone which abut existing residential homes. The application lacks a legal, sufficient, and adequate buffer to protect the adjacent residences.
Therefore, the proposed project is inconsistent with the Baldwin Park General Plan Policy
2.5. 37
3.General Plan Land Use Policy 2.6: “Require that the external lighting of commercial and industrial properties be confined to the site to avoid adverse impacts on adjacent land uses due to light spillover or glare.”
Per page A-1.3 of the submitted site plan, the applicant is proposing to use the existing six-foot-high concrete masonry wall along the southern perimeter of the Project Site and a meager and skinny, 5-foot landscape strip behind the wall. as a buffer. However, since the project wall at that location is 25’ tall and 150’ wide, any external field flood lights will be located above the 6-foot-tall wall, therefore rendering the buffer ineffective. In addition, the project site is directly adjacent to a residential homes neighborhood, which has a lower grade than the industrial properties, making these homes considerably lower than the project site. The 6-foot-tall existing block wall and the skinny, 5-foot landscape strip behind the wall are insufficient to protect the residents in the adjacent homes from the light and glare that the proposed soccer complex facility will generate.
In addition, photos of existing outdoor soccer complex facility lights were taken at the Lab5
Gardena soccer complex, which was used by the applicant as an example of a similar existing soccer complex facility for the noise study. similar to the proposed soccer complex facility (Exhibit L, Lab5 Pacoima and Gardena site photos). These photos show the type of lighting generally used to provide outdoor light bright enough to play nighttime outdoor sports safely. These over -sized, existing light standards extend far beyond the existing Gardena Lab 5 soccer complex fences and are very large. The submitted site plans do not show any outdoor field lighting on any of the exterior elevations as seen on pages A-1.3, A-1.4,and P-1.1 of the submitted site plans.
In the required and submitted Initial Study, Mitigation Measure AES 1 (Exhibit MM), requires that “The Project Applicant shall submit additional documentation as part of the required Schematic Lighting Plan and the Applicant’s Design Review Submittal package to the City of Baldwin Park Design Review Committee for review and approval. Additional documentation shall demonstrate that the proposed lighting conditions under the Project shall not result in excessive spillage. Additional documentation may include, but is not limited to, photometric site plans and or written statements of approval by the City Engineer.”
The applicant has not submitted a Schemic Lighting Plan as part of the Design Review submittal to the City of Baldwin Park There is no plan to show that the lighting at the proposed commercial soccer complex will be confined to the site as required by General Plan Land Use Policy 2.6, possibly because any lighting plan that could provide enough external lighting to illuminate the 4 elevated soccer fields for night play, would not be able to meet this policy requirement.
Ins
tead of requiring the applicant to submit a Schemic Lighting Plan, as required by Mitigation Measure AES 1., the Planning Department has instead provided Planning Design Review Condition of Approval (i), Attachment #2 Resolution of Approval – PC 23-
28. This substitute condition postpones the submittal and review of any Schemic Lighting 38 Plan until after the Planning Commission has already rendered its decision on the project’s Design Review; after the Planning Commission has already deliberated and determined that the proposed soccer complex facility will or will not comply with General Plan Land Use Policies 2.5, 2.6 and Municipal Code 153.140.020 cited above.
This postponement, besides being in direct conflict with Mitigation Measure AES 1, is also in direct conflict with Baldwin Park Municipal 153.020.030 RESPONSIBILITIES OF THE PLANNING COMMISSION:
“The Planning Commission shall have the following responsibilities: (C) Conditional use permits and variances. Hear and act upon applications for conditional use permits and variances.” The Planning Commission cannot “act upon” this application unless they have all the pertinent facts. Condition of Approval (i) also denies the Planning Commission and the Public the opportunity to determine if the proposed exterior flood- lights needed for night play can even meet the requirements of the Initial Study.
In
addition, the Initial Study noted that “implementation of Mitigation Measure AES -1 would reduce the Project’s impacts involving substantial light and glare to less than significant levels”, based on the specific provision that the project applicant shal l submit additional documentation as part of the required Schematic Lighting Plan and the Applicant’s Design Review submittal package”.
Without the Planning Commission being allowed to review the required Schemic Lighting Plan and without the Planning Commission’s determination that “the proposed lighting conditions under the Project shall not result in excessive spillage”, the project cannot be approved with a Mitigated Negative Declaration of Environmental Impact.
Since the light and glare that would be generated by the proposed soccer complex f
acility cannot be shown to be buffered or that “the proposed lighting conditions under the Project shall not result in excessive spillage”, Finding of Fact 1 cannot be made because the proposed project will not comply with the intent of all applicable provisions of this chapter.
Therefore, the proposed project is inconsistent with the Baldwin Park General Plan Policy
2.6. 4.General Plan Land Use Policy 2.7: Require that automobile and truck access to commercial and industrial properties adjacent to residential parcels be located the maximum practical distance from the residential parcel.
The driveways of the proposed soccer complex facility enter and exit on to Joanbridge Street, but the drive aisle providing access to the onsite parking will parallel the rear , adjacent residential properties thereby producing noise and fuel fumes which will spill over the property line, especially since the project is asking for a variance to reduce the required rear lot line setback to build the 2-story elevated soccer fields to within only 5 feet of the adjacent residential properties, which is 75% less than the required 20 foot 39 setback that a new Industrial use/construction is required to provide, per Section 153.050.030 Development Standards for Industrial and Commercial zones regarding Shared property lines with a lot zoned for residential use.
Therefore, the proposed project is inconsistent with the Baldwin Park General Plan Policy
2.7. 5.General Plan Land Use Policy 7.4: Require adequate on-site parking and circulation of developments so that roadways serving these projects can better serve traffic demands. Site review requirements should discourage on-street parking.
The proposed parking and circulation are inc
onsistent with this General Plan Policy.
There is no existing on-street parking on Joanbridge St. nor does the existing rolled-curb street design allow any on-street parking. Industrial property owners on Joanbridge Street have minimal parking in their front yard setbacks, which are all posted with “Employee Parking Only” or “No Parking” signs. (see Exhibit D Joanbridge St. Parking) In addition, the proposed project is insufficiently parked as designed. As previously st
ated, the applicant is proposing 39 parking spaces for the commercial recreational soccer complex facility. The Baldwin Park Municipal Code requires 152 parking spaces for a commercial recreational facility. See Parking discussion in section Finding of Fact 1 in this document.
Therefore, the proposed project is inconsistent with the Baldwin Park General Plan Policy 7.4.
6.General Plan Land Use Goal 17.0: Encourage development of low-scale, low-intensity commercial and industrial uses that do not require easy freeway access and that are oriented primarily toward serving the local resident and business populations.
The proposed over -s
caled soccer complex is inconsistent with this General Plan Goal.
The proposed project is also a high intensity commercial use. The proposed commercial recreational soccer complex facility will utilize one existing building and construct a huge 2-level concrete structure with 4 elevated soccer fields located on top of the structure. In addition, the soccer complex facility will cover 84% of the site.
The proposed 5x5 soccer-style commercial soccer complex facility is for members only; not open for the general public and local business populations to just pop in. The commercial soccer business is not designed for regular, affordable, accessible, recreational soccer, with full-sized soccer teams.
The applicant is proposing multiple, small soccer fields wh ich are designed for 5 x 5 or 8
x 8 play. The proposed smaller fields, while they may be used for training, are primarily designed for playing soccer matches with 5 or 8 person teams and one referee. These boutique 5 x 5 soccer fields, such as www.lab-five.com and www.SOFivecovina.com are increasingly popular social destinations for families and adults, with video games, snack bars, large screen televisions and sometimes alcoholic beverage bars. Good examples 40 of these boutique soccer field complex facilities can be found at the two Lab Five Soccer facilities located at 9740 Telfar Ave., Pacoima, CA (www.soccerfieldpacoima.com )and at 14000 Halldale Ave. Gardena, CA. ( www.gardenasoccerfield.com ) These two soccer complexes were identified for the CEQA Initial Study required Noise Study and the CEQA Initial Study required Traffic Study by the applicant as a soccer complex design similar to the proposed development on Joanbridge Street in Baldwin Park. Since most customers of this boutique type of soccer complex would be from out of town and traveling from the 605 Freeway, through Irwindale, the proposed soccer complex facility will only generate traffic, noise and trash for the local businesses, not revenue.
Therefore, the proposed project is inconsistent with the Baldwin Park General Plan Policy
17.0. 7.General Plan Noise Element Goal 1.0: Integrate noise considerations into land use planning decisions.
General Plan Noise Element NE12: Acoustical analysis will be required for projects that will generate noise potentially effecting sensitive receptors.
The negative effect of the illegal noise to be generated by the proposed soccer complex were not identified or even discussed in the staff report.
The Initial Study for the proposed Mitigated Negative Declaration for the proposed soccer com
plex showed that the noise generated by the soccer complex would exceed the noise levels allowed by any use adjacent to a residential property. The soccer complex noise levels were measured at Lab5 Pacoima, which was accepted by the applicant as a similar soccer complex use in the Los Angeles area. (see Exhibit N) The noise levels measured at that soccer complex location were a maximum noise level of:
91.8 dBA (day) and 78.3 dBA (evening). These exceed the noise levels allowed by the City of Baldwin Park Noise Ordinance in a residential zone which are 55 dBA (day) and 50 dBA (evening).
Noise Comparison
City of Baldwin Park (Sec. 153.140.070) Existing Soccer Complex Residential
7am – 7 pm (day) 55 dBA
1/25/23 6:10 pm
41.9 - 91.8 dBA average 64.2 dBA
Residential
7 pm – 10 pm (evening) 50 dBA
1/25/23 7:00 pm
46.4 – 78.3 dBA average 60.5 dBA
In addition, Baldwin Park Municipal Code 153.140.070 requires that “Noise levels shall be measured in dBA at the property line of the receptor property, (in this case the residential property directly south and adjacent of the proposed soccer complex) and at least four feet above the ground and five feet from the nearest structure or wall. Where a boundary or wall exists, the measurement shall be made on the receptor property. ” However, there were no noise levels measured on the residential properties what so ever.
41 General Plan Noise Element NE12 requires that an Acoustical analysis will be required for projects that will generate noise potentially effecting sensitive receptors.
The staff report did not contain any acoustical analysis or discussion or generate any specific Conditions of Approval to meet this requirement.
Therefore, the proposed project is inconsistent with the Baldwin Park General Plan Noise Element Goal 1.0, Policy 2.1 and page NE 12 of the City of Baldwin Park Noise Element.
Therefore, the Finding of Fact (8): “The use is consistent with the General Plan” has not been and cannot be made.
Finding of Fact (9): Safety and welfare. The use will not be detrimental to the public interest, health, safety, convenience or welfare.(pg.5)
Planning Commission staff report (pg.5):
“The use will not be detrimental to the public interest, health, safety convenience or welfare in that the gymnasium will be developed in accordance with all the development standards of the zone and will operate in substantial conformance to all conditions of approval as identified in the resolution of approval. The active recreational use promotes healthy lifestyles for the City’s youth, which is support of their general welfare.”
The Finding of Fact cannot be made that the use will not be detrimental to the public interest, health, safety, convenience or welfare.
Simply stating that the project will not be detrimental to the public interest, health, safety, convenience or welfare, without substantiating evidence, does not make it so.
The proposed soccer facility as presented will not to meet all of the development standards of the zone nor will it meet all of the operational standards of the zone, as shown in the table below.
• The Development Standard for the rear yard setback is a 20-foot setback; the applicant wants to build a 5-foot setback.
• The Development Standard is for a 50% maximum lot coverage; the applicant wants to cover 84% of the with four (4) outdoor elevated soccer fields lot. • The amount of parking required by the Development Standards is 152 parking spaces; the applicant is proposing 39 parking spaces.
• There is no on-street parking available on Joanbridge Street. Any area between the rolled curb on Joanbridge Street and the existing industrial buildings belong to the individual properties and are not available for public parking.
The proposed soccer facility as presented will not to meet all of the Operational Development Standards of the zone:
• The Operational Standard for allowed any Noise in a residential zone is that it must be measured in dBA at the property line of the receptor property and where a boundary or wall exists, the measurement shall be made on the receptor 42 property. In this case, the receptor properties are those residential properties located directly south of the proposed project site’s rear property line. The allowed decibel amount for a residential zone is 55 dBA day and 50 dBA evening; the proposed soccer complex project would produce 64.2 dBA day and
60.5 dBA evening.
• The proposed soccer complex facility does not meet the requirements of the Baldwin Park Municipal Code 153.150.010 which are to provide adequate off- street parking facilities, loading areas and vehicle movement areas; that the use of land does not adversely interfere with the circulation on public rights-of-way.
BP Required Development Standard Proposed Soccer Complex Setbacks 20 ft. rear yard Proposed Setback 5 ft.
Lot coverage allowed 50% Proposed Lot coverage 84% Parking required 152 parking spaces Proposed Parking Spaces 39 No Street Parking available Increased Street Parking not addressed BP Required Operational Standards
Noise 55 dBA (day)
50 dBA (evening)
64.2 dBA (day)
60.5 dBA (evening)
Traffic Increased Traffic not addressed
Light and Glare none allowed Not addressed
Fire/Paramedic Services Increased Fire/Paramedic Calls not addressed
Police Services Increased Police Calls not addressed
In addition, the staff report states in the finding of facts above, the gymnasium will operat
e in substantial conformance to all conditions of approval as identified in the resolution of approval.
Regarding the Conditions of Approval, the Mitigated Negative Declaration Resolution PC 23-29, which is required by CEQA to include all the Mitigation Measures of the Initial Study, only includes the requirements of how to handle Native American remains or artifacts. Therefore, Conditions of Approval PC 23-29 is incomplete and the Mitigated Negative Declaration invalid and not legally adoptable.
Further, if the proposal will “operate in substantial conformance to all conditions of approval as identified in the resolution of approval”, as stated in the staff report above, then because of the ambiguous and minimal number of Conditions of Approval in Resolution PC23-28, Planning Commission approval of the proposed project will grant the applicant of the proposed soccer complex virtually unlimited leeway in what they can construct and operate.
Planning Condition of Approval (a) requires “that the property shall be developed and maintained in substantial accordance with Exhibit A to the staff report dated December 43 13, 2023”. When questioned, Melissa Chipres, Associate Planner, stated that Exhibit “A” is the Attachment #2, the Resolution of Approval – PC 23-28. The submitted site plan and elevation plan, which the Planning Commission is being asked to review and approved, are not included in the Conditions of Approval. There is no Condition of Approval requiring that the constructed soccer complex facility be constructed per the site plans or per the elevation plans which were presented to the Planning Commission for their review and approval.
If approved as presented, Resolution of Approval – PC 23-28 would allow the developers to construct whatever kind of Recreational Facility (indoor/outdoor soccer facility) they want within 5 feet of a residential neighborhood, regardless of what is discussed at the review hearing. Even though the site plans and elevations may be discussed, there are no Conditions of Approval requiring that the complex resemble the submitted site or elevation plans what so ever.
• There are no Conditions of Approval limiting the soccer complex to a so-called soccer training school; no Condition of Approval that would prohibit soccer games for all ages except that “all participants shall be enrolled in a training program (Condition #e).
• There are no Condition of Approval to limit the hours of operation to those stated in the staff report, which means that all-day and all-night play would be available, as long as the “exterior field lights go off at 10 pm” (Condition #j). Play can continue without “exterior field lights” without restrictions.
• There are no Conditions of Approval limiting the ages of the soccer players to students aged 5 – 17; no Conditions of Approval that will limit the size of the soccer teams or the frequency of the games, except that there can be “no tournaments.”
• There are no Conditions of Approval requiring a specific number of parking spaces. The applicant is proposing 39 parking spaces while the Baldwin Park Municipal Code requires 152 spaces for a commercial recreational use. The size of the site plan will not accommodate the size of the proposed soccer complex with 152 parking spaces included.
• There are no Conditions of Approval from the City Departments, listed below, because they have not been requested by staff to review the submitted proposal, even though Municipal Code Section 153.210.090 states: Application materials shall be circulated to other city departments and agencies for review and comment as determined necessary or appropriate by the City Planner. Planning Division staff shall be responsible for requesting and incorporating comments into project modifications or conditions of approval to ensure conformance with all provisions of this code and other adopted policies and plans. 44 • No Building Division review (for light and glare); • No Engineering Division Review (for retaining wall grading, undergrounding utilities)
• No Fire Department Review regarding increased fire and paramedic calls for service
• NO Police Department Review (for increased disturbance, noise and light glare nuisance calls)
• NO Public Works Department Review (for traffic circulation issues) • NO Landscaping Review
Therefore, the Finding of Fact (9): “The use will not be detrimental to the public interest, health, safety, convenience or welfare” has not been and cannot be made.
Conclusion
Baldwin Park Municipal Code 153.210.480 (Determination) “The Planning Commission may impose conditions and/or require guarantees for the conditional use permit to ensure compliance and to prevent adverse or detrimental impacts to the surrounding neighborhood. Conditional use permits shall be granted when the Planning Commission determines that the proposed use or activity complies with all of the following findings.”
As Baldwin Park Municipal Code 153.210.480 (Determination) above states:
“Conditional use permits shall be granted when the Planning Commission determines that the proposed use or activity complies with all of the following findings.”
In the case of the Finding of Facts for the granting of the proposed CP 23-05, none of the Finding of Facts can be made, therefore, the Planning Commission can not approve Conditional Use Permit CP 23-05.
45 Finding of Fact – Zone Variance ZV-23-01
Planning Commission Staff Report (pg.5):
“The applicant is requesting approval of a Zone Variance to allow deviation from the minimum rear and side yard setback requirements. The I zone requires a minimum ten (10) foot rear and side yard and the applicant is requesting a five (5) foot deviation from the standard. Approving the deviation would allow for larger soccer fields on the second floor. The size of the soccer fields on the second floor as shown on the plans is the minimum size that the applicant deems practical for use as a training field. Therefore, without the approval of the reduced setback, this project becomes impractical.”
Public Comments:
• The Industrial zone requires a twenty-foot (20’) rear yard setback, double the regular ten-foo (10’) setback, for new construction on an industrial property when the industrial property shares a rear property line with an adjacent residential zone, neighbor hood or area, which is the case with the proposed Commercial soccer complex facility. (BP Municipal Code 153.050.030 (A) (2) “Wherever a commercially or industrially zoned lot shares a property line with an exclusively residential or a mixed-use zoned lot, any exterior new structure, or addition to an existing structure, that exceeds one story in height and that faces any rear or side lot line shall be set back twice the required setback.”
• The deviation being requested would therefore be a significant fifteen-foot (15’) deviation, not a small five-foot (5’) deviation. That is a 75% special deviation instead of a 50% deviation, a 75% deviation that no other property on Joanbridge Street has been granted.
• The fact that the requested deviation is “more practical” for the applicant giving the more room to generate revenue, that is ‘more profitable’, is not a valid reason for the Planning Commission to approve the requested deviation from the norm. If the proposed, outsized soccer complex facility need a larger area for more, larger soccer fields, perhaps the proposed location is not a good location for their proposal.
153.210.400 INTENT AND PURPOSE.
“California Gov’t Code § 65906 establishes the authority of the city to grant exception to development standards and provisions of this chapter in cases where, because of 46 special circumstances applicable to a particular property, the strict application of this code deprives such property of privileges enjoyed by other property in the vicinity and under identical land use zoning districts.”
153.210.430 DETERMINATION.
The Planning Commission may impose conditions and/or require guarantees for the variance to ensure compliance and to prevent adverse or detrimental impacts to the surrounding neighborhood. Variances shall be granted only when the Planning Commission determines that the proposed development or activity complies with all of the following findings.
1.Special circumstances. There are special circumstances applicable to the property, including size, shape, topography, location or surroundings, that do not generally apply to other properties in the same district. (pg. 5)
Planning Commission Staff Report (pg.5):
“The side and rear yard setback development standard for properties located within the Industrial Zone is ten (10) feet. There is wall for the proposed parking area and soccer fields that encroaches 5’ into the code-required 10’0” side and rear yard setback. The encroachment into the required yard areas is needed to increase the width of the proposed soccer fields located on the second floor to practical dimensions.”
This Finding of Fact has not been made that there are special circumstance unique the subject property, that the other properties on Joanbridge Street do not have.
There is nothing special about the size, the shape, or the topography at 14412 and 14424 Joanbridge. The lots on Joanbridge Street are all primarily rectangular, flat and generally the same size, except where lots have been merged to form larger lots. This is especially true of the industrial lots on the south side of Joanbridge Street, which is the same side of Joanbridge Street where the subject property is located.
The fact that “the encroachment into the required yard areas is needed to increase the width of the proposed soccer fields located on the second floor to practical dimensions” does not pertain to or reflect any special circumstances applicable to the project site.
Increasing the area of a business to “practical dimensions” is not a special circumstance. All business owners would like that special consideration of more business space. The profitability of a business is not a consideration of the Planning Commission when reviewing a Variance application.
The question is, Is there something special about the site property, such as size, shape, topography, location or surroundings.
The answer is: There are no special circumstances about the site property.
Except that the subject property shares a rear property line with an existing residential zone which does require special treatment. Special treatment such as a twenty-foot (20’) rear setback ( Baldwin Park Municipal Code 153.050.030 Development Standards for 47 Commercial and Industrial zones) “to prevent impacts on residences due to noise, traffic, parking, light and glare, and differences in scale; to ensure privacy; and to provide visual compatibility.” noise, traffic, parking, light and glare, and differences in scale; to ensure privacy; and to provide visual compatibility, as called for in the City of Baldwin Park General Plan Land Use Policy 2.5:
.
Table 153.050.030 Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I Additional
Regulations
Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I Additional Regulations Rear yard setback -
minimum
lot adjacent to a residentially
zoned lot
10 ft
10 ft
10 ft
10 ft
10 ft
153.130.030
153.050.030 (A) (2) Wherever a commercially or industrially zoned lot shares a property line with an exclusively residential or a mixed-use zoned lot, any exterior new structure, or addition to an existing structure, that exceeds one story in height and that faces any rear or side lot line shall be set back twice the required setback.
Lot coverage - maximum 50% 50% 50% 50% 50%
Therefore, the Variance Finding of Fact (1): Special circumstances. There are special circumstances applicable to the property, including size, shape, topography, location or surroundings, that do not generally apply to other properties in the same district has not been made.
2.Similar privileges. The strict application of this chapter deprives such property of privileges enjoyed by other properties in the vicinity and other identical zoning classification. (pg.6)
Planning Commission staff report (pg.6):
“The subject sites were both developed with industrial commercial use buildings that have been in Baldwin Park since 1960 and over the past 63 years, the existing buildings have maintained a zero-side yard setback. The applicant has approached the City for consideration of variances due to the uniqueness, size and use of the facility. Staff agrees that the original building/project were reviewed and approved in favor of the betterment of the community, and to serve the health and wellness of the residents in the surrounding region and believes granting of the variances will not cause any adverse impacts on the adjacent properties.”
48 Public Comments:
1. Both of the subject sites were not built in the 1960’s as stated in the Planning Commission staff report, but were built on the dates shown on the attached Los Angeles County Assessor’s Parcel Detail printout. (Exhibit G) The building at 14412 Joanbridge Street (APN 8414-023-011) was originally built in 1960, then demolished and rebuilt in 2014, with the complying twenty-foot (20’) rear yard setback.
The building at 14424 Joanbridge Street (8414-012-010) was built in 1960, also with the complying rear yard, and is still existing.
2. T he buildings have not maintained zero-side yard setbacks, as asserted in the Planning Commission staff report, but were both built with only one side yard having a zero-side yard setback, as shown on the aerial photos from Google Earth Exhibit G, attached, not a zero-side yard on both sides.
Both 14412 and 14424 Joanbridge Street have an existing zero-side yard setback on the west side property line. The east side of both properties are used for driveways access.
3. In addition, and most importantly, neither 14412 or 14424 Joanbridge currently have existing zero setbacks at their rear property lines, where the existing industrial properties abut the existing residential properties to the south.
4. Both the 14412 and 14424 Joanbridge Street structures were originally constructed with at least a twenty-foot (20’) rear yard setback in accordance with the Baldwin Park General Plan Land Use Policy 2.5 and the Baldwin Park Municipal Code 153.050.030(A)(2), as previously reference in the document above. The existing buildings and their existing setback areas are clearly seen, as shown on the aerial photos from Google earth attached. (Exhibit G) This is why the applicant is required to continue to maintain the original twenty-foot (20’) rear yard setbacks
5. The granting of the variance being requested, (which is to reduce all setbacks; that is to reduce both east and west side yard setbacks and the crucial rear yard setback), to five feet (5’), will most definitely cause an adverse impact on all the adjacent properties, both industrial and residential, but most especially the residential properties to the rear of the proposed project.
6. It has already been established the uniqueness, use and size of the proposed soccer complex facility project is not a consideration of the Planning Commission when reviewing a Variance application; only uniqueness of the physical lot.
7. In addition, the variance to allow construction of the soccer complex facility to within five-feet of a residential area and zone, would be very detrimental to “the health and wellness of the residents in the surrounding region” and granting the variances will definitely cause adverse impacts on the adjacent properties, such as increased noise, light/glare, trash/soccer balls thrown onto the residential properties and a very negative aesthetic view.
49 8. The required twenty-foot (20’) rear yard setback has been enshrined in the City of Baldwin Park’s General Plan and Municipal Code to ensure that the existing adjacent residential properties are not affected by any new construction or uses in the Industrial zone.
The Finding of Fact 2. Similar Privileges has not been made that the strict application of this chapter deprives such property of privileges enjoyed by other properties in the vicinity and other identical zoning classification.
The proposed project, if approved, would cover 84% of the subject property while the legal limit is 50%. No other properties on Joanbridge have been constructed to cover that much of their properties with structure. These other properties would surely also be as interested in over-building their properties, if also illegally allowed.
In addition, the variance to allow construction of the soccer complex facility to within five-feet of a residential area and zone, would be very detrimental to “the health and wellness of the residents in the surrounding region” and granting the variances will definitely cause adverse impacts on the adjacent properties, such as increased noise, light/glare, trash/soccer balls thrown onto the residential properties and a very negative aesthetic view.
The required twenty-foot (20’) rear yard setback has been enshrined in the City of Baldwin Park’s General Plan and Municipal Code to ensure that the existing adjacent residential properties are not affected by any new construction or uses in the Industrial zone.
3. Consistent privileges. The granting of the variance does not constitute a grant of special privileges inconsistent with the limitations upon other properties in the vicinity and zone in which the property is situated. (pg.6)
Planning Commission staff report (pg.6):
“The granting of the zone variance would not be materially detrimental to the public welfare or injurious to adjacent property. The project will provide a five (5) foot side and rear yard setback and will further enhance side and rear yard elevations with mature landscaping to deter any visual impact to the adjacent properties.”
Public comments:
The granting of the zone variance would be materially detrimental to the public welfare and injurious to adjacent property.
Per
page A-1.3 of the submitted site plan, the applicant is proposing to use the existing six-foot-high concrete masonry wall, not provide a new five- foot (5’) new wall, along the southern perimeter of the Project Site and a meager and skinny, 5- foot landscape strip behind the wall. as a buffer. However, the project site is directly adjacent to a residential 50 homes neighborhood, which has a lower grade than the industrial properties, making these homes considerably lower than the project site.
The existing 6-foot-tall block wall and a the proposed skinny, 5-foot strip of landscaping are insufficient to plant or grow mature landscaping or to “deter any visual impact to the adjacent properties”. The proposed twenty-five foot (25’) tall and one hundred fifty -foot (150’) wide soccer complex facility structure will be seen above the six-foot (6’) wall.
It is has already been thoroughly established that the granting of the zone variance would be materially detrimental to the public welfare and injurious to adjacent property.
Based on the requirements of the Baldwin Park General Plan Land Use Policy 2.5 and the Baldwin Park Municipal Code 153.050.030(A)(2), as previously reference in the document above, the minimum twenty-foot (20’) rear yard setback is required to ensure that any new construction in the Industrial zone, on a lot that abuts an existing residential zone, in order to prevent impacts on the public welfare and residences due to noise, traffic, parking, light and glare, and differences in scale; to ensure privacy; and to provide visual compatibility.”
Regar
ding the assertion that the proposed project will not be “injurious to adjacent properties”, the project would clearly be injurious to the adjacent residential properties in that the construction of a twenty-five foot (25’) tall, one hundred fifty foot (150’) wide, two- story, elevated 4 soccer field soccer complex facility with the generated illegal noise, light/glare, trash, increased traffic and parking problems, along with the lack of privacy and negative visual impact of a prison- like monolith structure looming over the private homes, would indeed be injurious to the adjacent residential property values, as verified by a licensed property appraiser .(Exhibit H) Also, the minimal amount of landscaping which could be packed into the very narrow five-foot (5’) setback area would not meet the definition of “mature landscaping” nor would it in any way deter any visual impact.
In addition, neighboring commercial and industrial businesses would also be injured by the increase in traffic and parking problems, trash, noise, and light/glare as previously noted in this document. These nuisances would be inconvenient for both the bus iness owners and their customers to deal with, leading to decrease productivity in workers and a decrease of customers and revenue.
The Finding of Fact of “Consistent Privileges” has not been made in that the granting of the variance does constitute a grant of special privileges to the applicant, inconsistent with the limitations upon other properties in the vicinity and zone in which the property is situated.
The granting of the variance being requested will grant the applicant a special privilege that is not enjoyed by other properties in the vicinity and Industrial zone which is to be able to build a larger structure than would legally be allowed. As shown on google earth satellite view (Exhibit G), there are no other properties on Joanbridge Street which have built permitted structures with a 5’ side yard setbacks on both east and west property lines, such as the applicant is requesting.
51 Neither have any other properties along Joanbridge Street been allowed to encroach into the required twenty-foot (20’) rear yard setback, next to the residential area and zone. Also, the proposed project, if approved, would cover 84% of the subject property while the legal limit is 50%. No other properties on Joanbridge have been constructed to cover that much of their properties with structure. These other properties would surely also be as interested in over-building their properties, if also illegally allowed.
The granting of the variance being requested will also grant the applicant a special privilege that is not enjoyed by other properties in the vicinity and Industrial zone which is to be able to build a larger structure than would legally be allowed. As shown on google earth satellite view (Exhibit G), there are no other properties on Joanbridge Street which have built permitted structures with a 5’ side yard setbacks on both east and west property lines, such as the applicant is requesting. Neither have any other properties along Joanbridge Street been allowed to encroach into the specially required twenty-foot (20’) rear yard setback, next to the residential area and zone.
In fact, the granting of the requested variance would indeed grant special privileges to the proposed soccer complex facility by not requiring them to adhere to the development standards and the General Plan Land Use requirements that the other existing industrial uses have been and currently are required to abide by. No other use in the area is allowed to be closer than 20’ to the rear property line next to residential homes; no other industrial structures have been allowed to reduce their side yard lots to a very narrow five (5’) feet in depth.
Also, a special privilege would be granted to the soccer complex facility application if the soccer complex facility would be allowed to provide only 39 parking spaces for the facility when 152 parking spaces are required. All other existing industrial business are required to provide sufficient on-site parking per the development code.
4. The granting of the variance will not adversely affect the General Plan of the City of Baldwin Park. (pg.6)
Planning Commission staff report (pg.6)
“The variance will not adversely or negatively affect the General Plan or its goals beca
use the property will be utilized for commercial purposes in accordance with the site’s General Plan designation of General Commercial that allows recreational facilities uses with the approval of a conditional use permit.”
Publ
ic Comments:
The site’s General Plan designation is “General Industrial” not “General Commercial”.
Per General Plan Land Use Element LU-27:
“This category provides for areas where a
broad range of assembly, manufacturing and material production businesses can operate without adversely affecting surrounding land uses. A limited range of commercial businesses is also permitted to support the businesses and work force; for 52 example: eating establishments, service stations and hardware stores.” The General Plan does not allow recreational facilities in the General Industrial zone, but rather recommends primarily manufacturing type uses in the zone with “a limited range of commercial businesses to support the businesses” such as restaurants, service stations and hardware stores. The commercial “members only” soccer complex facility does not support the existing industrial manufacturing, body shop and recycling uses in the General Plan General Industrial category.
The Finding of Fact of 4. The granting of the variance will not adversely affect the General Plan of the City of Baldwin Park has not been made in that:
As
shown below and previously discussed in this document, the granting of a variance to allow a reduced side and rear yard setbacks is not consistent with the General Plan and policies.
1.General Plan Land Use Goal 2.0: “Accommodate new development that is compatible with and complements existing conforming land uses.”
The proposed new development is not compatible with and complement ing to existing conforming land uses.” The proposed 25’ tall and 150’ wide soccer complex, with 4 elevated outdoor soccer fields on the second level is not compatible with the existing , primarily single story, conforming Industrial uses, nor is the proposed 25’ tall and 150’ wide soccer complex , with 4 elevated outdoor soccer fields on the second level compatible with or c omplementary to the existing, primarily single story homes in the adjacent residential uses.
2.Gen
eral Plan Land Use Policy 2.5: “Require that industrial development provide adequate buffers at the designated boundaries with adjacent uses to prevent impacts on residences due to noise, traffic, parking, light and glare, and differences in scale; to ensure privacy; and to provide visual compatibility.”
Adequate buffers are not provided. The proposed 25’ tall and 150’ wide soccer complex, with 4 outdoor soccer fields on the second level will generate illegal levels of noise, traffic and parking problems, light glare and trash, lack of privacy, and be visually incompatible with adjacent residential homes and is not compatible with the existing conforming Industrial or adjacent residential uses.
As one of the residences directly abutting the project site is the home a 30-year special needs son of the property owners (a son who has seizures triggered by loud noise and light glare) this is completely unacceptable.
A zone Variance to allow all structures to encroach into the rear yard setback to within 5 feet of the rear property line, adjacent to the residential home properties, even though the Baldwin Park Municipal Code 53.050.030 specifically requires a 20- foot setback for all new structures built in the Industrial zone which abut existing residential homes , is not “buffering”. The application lacks a legal, sufficient, and adequate buffer to protect the adjacent residences.
53 3.General Plan Land Use Policy 2.6 : “Require that the external lighting of commercial and industrial properties be confined to the site to avoid adverse impacts on adjacent land uses due to light spillover or glare.”
The applicant has not submitted any Photometric or Light Plans that show that the lighting at the proposed commercial soccer complex will be confined to the site
5.General Plan Land Use Policy 7.4: Require adequate on-site parking and circulation of developments so that roadways serving these projects can better serve traffic demands. Site review requirements should discourage on-street parking.
One hundred and fifty-two (152) parking spaces are required but only 39 parking spaces are provided. There is no existing on- street parking on Joanbridge St reet nor does the existing rolled-curb street design allow any on-street parking.
7.G
eneral Plan Noise Element Goal 1.0: Integrate noise considerations into land use planning decisions.
General Plan Noise Element NE12: Acoustical analysis will be required for projects that will generate noise potentially effecting sensitive receptors.
The Planning Commission staff report did not discuss the noise that would be generated by
the proposed project. The negative effect of the illegal noise to be generated by the proposed soccer complex were not identified or even discussed in the staff report. An acoustical analysis Noise Monitoring Field Report, (Exhibit N) as shown below was commissioned and submitted by the applicant as a requirement of the CEQA review for the proposed elevated soccer fields complex and included in the Initial Study attached to this proposal (Exhibit IS). However, although the Noise Monitoring Field Report was submitted to the Planning Commission as part of the Initial Study for their review, the Noise Monitoring Field Report was not provided to the Planning Commission and was not discussed in the staff report to the Planning Commission. The Resolution of Approval for the proposed project does not contain any Conditions of Approval specifically requiring the applicant to meet the Noise standards of the residential areas adjacent to the proposed soccer complex facility site.
Initial Study Noise Monitoring Field Report
Location Time Maximum
Recorded Noise
Level (dbA)
Average Recorded
Noise Level (dbA
Lab 5 soccer complex
facility
9740 Telfair Ave
Pacoima CA
7 p.m. - 10 p.m.
(Evening)
91.8 dbA 60.5 dbA
Lab 5 soccer complex
facility
7 p.m. - 10 p.m.
(Evening)
78.3 dbA 60.5 dbA
54 9740 Telfair Ave
Pacoima CA
The soccer complex noise levels were measured at Lab5 Pacoima, www.Lab5.com which was provided by the applicant as an example of an existing soccer complex facility similar to the proposed soccer complex facility. The Lab5 Soccer facility was identified by the applicant, as a good example of the noise levels generated by a soccer facility complex similar to the one they are proposing.
The noise levels measured at the Lab5 soccer complex location were taken on a Wednesday night in January (1/25/23). The noise recorded was:
an average noise level of 64.3 dBA (day), maximum noise level of 91.8 dBA (day) and an average noise level of 60.5 dBA (evening), maximum 78.3 dBA (evening).
The table below comparing the City of Baldwin Park Residential Noise Standards and the applicant’s Noise Study clearly shows that the average noise levels generated by the soccer complex facility exceed the allowable noise levels in a residential zone by 9.3 – 10.5 decibels. The maximum noise generated by Lab5 facility exceeded the allowable noise levels in a Baldwin Park residential zone by 28.3 - 36.8 decibels. Remembering that In the case of the proposed soccer complex facility, the Noise levels generated by the soccer complex facility are to be compared to the allowable of noise that may be received by the residential property, per Baldwin Park Municipal 153.140.070 NOISE (B. cited above.
Noise Comparison
City of Baldwin Park (Sec. 153.140.070) Existing Soccer Complex Residential
7am – 7 pm (day) 55 dBA
1/25/23 6:10 pm
41.9 - 91.8 dBA average 64.2 dBA
Residential
7 pm – 10 pm (evening) 50 dBA
1/25/23 7:00 pm
46.4 – 78.3 dBA average 60.5 dBA
The proposed soccer complex facility will therefore generate noise during both day and the evening hours of operation substantially above the allowed levels for a new use in an Industrial zone abutting an existing residential Zone thus making the proposed soccer complex facility not allowed to be constructed at the proposed location, per Baldwin Park Municipal Code 153.140.020 Performance Standards, noted above, which states: “Buildings and land uses shall not be used or constructed if they create a dangerous, noxious, fire, explosive or other hazard; noise an illegal use at the proposed location.”
153.210.430 DETERMINATION.
The Planning Commission may impose conditions and/or require guarantees for the variance to ensure compliance and to prevent adverse or detrimental impacts to the surrounding neighborhood. Variances shall be granted only when the Planning Commission determines that the proposed development or activity complies with all of the following findings.
55 In the case of the Finding of Facts for the granting of the proposed Zone Variance ZV 23-01, none of the Finding of Facts can be made, therefore, per City of Baldwin Park Municipal Code 153.210.430 DETERMINATION, the Planning Commission can not approve Zone Variance ZV 23-01.
California Environmental Quality Act (CEQA)/ Noticing (pg.6)
Planning Commission Staff Report: (pg. 6)
“The initial study prepared for the Project disclosed that the Project will have A significant impact on the environment. Mitigation measures have been incorporated into the project’s design and as conditions of approval to reduce impacts on the environment to a less than significant level.”
Public Comment:
Mitigation Measures (Exhibit MM) have not been incorporated into the project’s design. • Mitigation Measure AES-1 requires the applicant to submit additional documentation as part of the required Schematic Lighting Plan, such as photometric site plans. The applicant has not submitted a Schematic Lighting Plan.
Mitigation Measures that have not been included in the Conditions of Approval:
• Mitigation Measure CUL -1 regarding cultural resources discovered during groundbreaking.
• GEO-1: Paleontologist required if necessary.
• HAZ-1 & HAZ-2: regarding the presence of asbestos.
• TRA-1: In the case of a full parking lot, the applicant shall pass out flyers to the people trying to find parking spaces, telling them where else they can park on the surrounding residential neighborhood streets.
The Mitigated Negative Declaration Resolution PC 23-29, which is required by CEQA to include all the Mitigation Measures of the Initial Study, only includes the requirements of how to handle Native American remains or artifacts, which renders the Mitigated Negative Declaration invalid.
Per the Mitigated Negative Declaration, Resolution PC 23-29 , Attachment #1, Section 2:
As the decision making body for the Project, the Planning Commission has reviewed and considered the information contained in the Initial Study /MND and administrative record including all oral and written comments received during the public review period…… (1) finds the initial Study/MND contains a complete and accurate reporting of the environmental impacts associated with the Project…….. (2) find the Initial Study /MND and administrative record have been completed in compliance with CEQA.”
56 Section 3. Based on the Initial Study /MND and the administrative record including all written and oral evidence presented to the Planning Commission, the Planning Commission (3) finds that all environmental impacts…are either insignificant or can be mitigated to a level of insignificance pursuant to the Mitigation Measures outlined in the MND. [but not included in the Conditions of Approval, so non-binding to the applicant] The Planning Commission further finds that there is (4) no substantial evidence in the administrative record supporting a fair argument the project may result insignificant environmental impacts….”
The Planning Commission cannot make Finding #1, Finding #2, Finding #3 or Finding of Fac
t #4. Therefore, the application for the construction of the proposed two Level, 23,259 square foot soccer complex facility, covering 84% of the lot; with four (4) soccer fields outdoor on the second level of a 25’ tall square monolithic structure, 167- feet deep by 150- feet wide; producing noise above allowed levels; intrusive nighttime light/glare above allowed levels; insufficient parking per code; increased traffic congestion and personal privacy and safety intrusions should be denied due to non- compliance with CEQA.
57 ...
Designer
Date
01/08/2024
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min
_
SOCCER 1-3 22 .8 fc 52.7 fc 12.3 fc 4.3:1 1.9:1
_SOCCER 4 23.7 fc 52.2 fc 5.1 fc 10.2:1 4.6:1
PL1-3 EAST 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL1-3 SOUTH 0.0 fc 0.1 fc 0.0 fc N/A N/A
PL1-3 WEST 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL4 NORTH 0.0 fc 0.1 fc 0.0 fc N/A N/A
PL4 WEST 0.0 fc 0.1 fc 0.0 fc N/A N/A
Current View
...
Designer
Date
01/08/2024
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Current View
...
Designer
Date
01/08/2024
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Current View
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min
_S
OCCER 1-3 21.8 fc 43.1 fc 10.9 fc 4.0:1 2.0:1
_S
OCCER 4 21.5 fc 44.7 fc 5.8 fc 7.7:1 3.7:1
PL1-3 EAST 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL1-3 SOUTH 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL1-3 WEST 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL4 NORTH 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL4 WEST 0.0 fc 0.1 fc 0.0 fc N/A N/A
...
Designer
Date
01/08/2024
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Current View
Exhibit A
Petition and letters against the project
Heltro,
My narne is .Toana Fang, and tr grew up otl Califomia Ave, in Baldwin Park. I am writing to yori to strongly oppose the addition of the soccer complex being proposed for 14412 & 14424 Joanbridge Street in tsaldwin Fark. This proposed complex'wouid be right next to my childhood home.
This neighborhood is not the right place for this complex. We are sun-ounded by the one-lane street of Maine Ave, which is not set up to handle the traffic influx that this place will bring.
Further, rnany people unfainiliar with the area get lost here. Potential customers wouid frequentiy get trost and tum onto California Ave (not a through street), causing a disfurbance to our neighborhood.
In adclition to traffic, parking will be a major issue. The proposed parking structure is not enough, and thus, customers would park onto sunounding streets, including ours, which are typically already full on a day-to-day basis. By allowing this business to build here, yori will be preventing community members from parkingnear their homes. We will have no place to park.
Furtheq when looking at the other locations of Lab Five, I see that their hours are 8am-midnight &!_ipq;liqlv*!!_Ab-j$v,e.qqtE,iE-q_ntaq!1) . Further, they have the option for clients to schedule events outside of these hours. This means that there is a 2417 period of noise. That is not okay. Soccer tournaments, games, and events are inlerently loud and should not be built within neighborhoods, such as ours.
Community members have dogs, children, and adults who are sensitive to noise. This will disrupt their living. The large sporting lights that will be built upon a roof will glare into our homes, once again 2417 . Thris will also deprive us of our privacy as event-goers can see into our homes. This is not okay. Once again, I skongly oppose this project because it wiltr tremendously negatively affect communify members of Baldwin Park. Please think about the residents that have lived here for decades, and reject this proposal. Thank you for your time.
Sincerely,
Joana Fang
December 13,2023
12/3,2/2023
We have supplied you a drawing of a side view of the pnoposed soecen field and the exisfing honne dlreetly behimd the ffeld at 3.44i-g California.
This drawing shows the signifieant height diffenenee of the two pnoperfies and amplifies the effeets of light pollution into the California stneet properties. This light pollulfion is nrot aceeptable and should never be allowed by the planning commission" The developer does not indicate where on how high the light poles will be, but it is assumed that they wiNl be 2CI to 25 feet above the playing surnfaee so the players wilX not have light directly in their eyes.
Noise pollution from ongoing garnes will disnupt the wel! being of the nesidents adjaeent to the proposed ffelds as well as linniting those residents use of their own back yands due to light and noise pollultion fronn this facillty"
Acconding to the Centers for Disease Control and Prevention, L7 percent of adults have perrnanent damage to their hearing due to nolse.
Any sound above 85 dB can cause hearing loss, and the loss is related both to the power of the sound as well as the length of exposure. you know you are listening to an 85-dB sound if you have to raise your voice to be heard by somebody else.
ln the applicants own noise monitoring field report, noise tevels of 91.8 db were recorded in Pacoima between 6;10 and 6:25 PM. On 1,/ZS/ZOZ3.
Residents should not have to accept what planning is proposing.
How would you like to have this in your back yard?
lf you can honestly say that you wouldn't mind this in your back yard, go ahead and vote for it...if not then turn this project down"..this is not the place for it.
ilr^,Aaee
-ts.(t-$$
Gfr
pffi
f
Trrf,15
,d
/
f
^g
V
1I$..!{s **ii#|,,,
i4islllV
liar+r**t:{
1X**i3* Ki\r*t li$,Hrni*{
t t$.*ti0 Ar4rl$ S{irdir*q
liln*tr8 tt*in *aw
9fr=I&0 FarYBr 1$,$rl
tg*St S!4y r4+q${rptd
?S-8& f,ily:itr**t
?$-?E lrltld r,.&*i6
5{i *Sg !'I$ri:}nt (r}r1!*${ti&li
tl r*
ij 6, ruu,^d
r {tt1
& 9t 9 "^t:
Gr, . \o yt r rJ\
r00 dsi't,
:::
9$ ds
8e d8
6Sdt ""
3S d8
: r: _,.::: . , {$-t! et}iet *fiit$
4ft dB :: -- ':':.:::
r::::.1 ::ti:i I, i::r,. i
:r:r,1.:).r,::::'i 3{*lt6 &n*! bqrdld}Q*n
S**er1l.=llji::::!::i;:::
li:i':'r':::ii
ri:n ::.:lltjir :
a:ili::'iJji:
?BdE,:ri,i;
::::':;t::t'i:N
-l '' ..: ,
1..'..,Ii'..:.i:l-
1s d8;-i.r-:
i l, i:,IE-r-:sl{,i{
tqw,4; itJ
la+e;fi
O dBltffil 0 lhrethotd ol hearmg
,4*.{f& [.]pp*r t*ireri"r*1d of gr*:.ir"r
Nffig!
I DO NCIT WANT A i.I[,'GE 2 STCRY SOCCER COMPTEX
IN MY NEIGHBORHOOD
L44LV &14424 Joanbridge St", Baldwin Park
OPERATING HOURS: 4 PM - PAST L0 PM EVtrRYDAY CIF THf
WEEK
8 AM _ PAST 6 PM SATURDAY
8 AM * PAST 2 PM SUNDAYS
CAUSIruG INCREASED
. NOISE
TRAFFIC
I.{UGE LIGI{TS ON THE SECOND FLOOR
TRASH
IN MY NEIGHBORHCIOD
Na rne Address
"/;tir, L*,, ?{ o
it*+{ | L*.1'Jr;lrL: c1 Av'(.
)
I': f r.ri: \ . (n f,r vl.rn ?
i.t,1 I t, L$ \' \cr ni *., P'u:<-
-I'{.r;i.\'.ir , vr -?->r.v [1 r' h rlltrr.r {-
y$I_>\^l extz t*t$,S\xPH'n *E,.u,o
NO!!
I DO NOT WANT A HUGE 2 STORY SOCCER COMPLEX
IN MY NEIGHBORHOOD
1,4412 &1.4424 Joanbridge St., Baldwin Park
OPERATING HOURS: 4 PM - PAST 10 PM EVERYDAY OF THE
WEEK
8 AM _ PAST 6 PM SATURDAY
8 AM - PAST 2 PM SUNDAYS
CAUSING INCREASED
NOISE
TRAFFIC
HUGE LTGHTS ON THE SECONp ftAOR
TRASH
IN MY NEIGHBORHOOD
n ^ Name Add ress
{//bW lW / fAaqh44.a/ Aa/"^-
Exhibit B
Futbl Game Changer in Baldwin Park
California
EIN 8S3619345 - Futbl Game Changer, Baldvvin PE*' Calif( 1,5:36 PM
w#
Futbl Game Changer in Baldwin Park, California
Home (//eintaxid.com/) ;, Companies with'P (//eintaxid.com/companles/f/) t FutblGame Changer Organizafon Bofile
.-,0' nr*. -;;;r*;t", *-*.--*0, "*r-,rrtion ,*rr*i
in Balrdwin Park, California. The Employer ldentification Number (ElN) for Futh'lGame Changer is 8536193{5' EIN
is also referred to as FEIN (Federal Employer ldentification Number) or FTIN (FederalTax ldentification Number).
The organization type for Futbl Game Changer is
CSmggfigg and its contribution deductibility status is
Contrrihutions arB dedyctihle. FutblGame Changer is
exempted by IHS under the category of charitable
Organization. The organization is an independent
organization or an independant auxiliary. The latest return for the tax period was filed in December,l0?Z.
Basic Profile
FutblGame Changer
85-361 9345
Orparization Name
Hil $axpayer Id)
GorSeCt Addrepp:
Address Lins
city
$tete
zip
1M24 Joanbridge St
Baldwin Park
California
9170e1746
Tar EXem
683 a ffi@
arlaaa!tl I
Posts
fiIIfifiHil
FUTBL GameChangers
37 followens . 0 following
$ ruessage P rollow Q. Search
About Mentions Reviews Reels Photos More v
lntro
Mentoring youth female soccer athletes to hecome confident and skillful. Head Coach Sheima Berenji
@ Page' Nonprofit organization
Baldwin Park, CA, United States, California
I [email protected]
futblgamechanger.crg
Not vet rated (0 g*uis\ils1 W
&
ffi
-*.
ffi
HffirtEI
$OEEER
Our Development
Our Sessions Our Clinics
Our Consults FGC Progrom
Our Lob Our Steff
Our Testimoniols
*t*trN th* W*!t{ist
THE TGC IAB
$occer Performonce fcciliry
equipped with highest quolity equipment to drive
the success of eqch othlete.
Fnf[ttEc
SOEEEH
ffi
Our Development
Our Sessions Our Clinics
Our Consults FGC Progrom
Our Lob Our Stqff
Our Testimoniols
".'0lN the kVcltlist
r,1
ti
Shooting Clinic
Concellotion Policy: No Refundr for concellotions mode ofter the 48 hour requiremett Molreup ot discretion of Cosch.
Low ottendonce clinics moy be rescheduled or concelled.
FUTBTTEE
SOEEEH
Our Development
Our Sessions Our Clinics
Our Consults FGC Progrom
Our Lob Our Stoff
Our Testimoniols
lnterested in renting the focility?
Send us o message snd we will be touch with pricing ond ovoilobility.
NOme {required)
First Nome
.
i
1|i--".--. "-*---* **.*
Em0il (required)
Last Nome
,-.-*_-'*.,_
I
I
i
t
I
!
t
FUTEtKEE
$OEEEB
hiday, Mare[ 28th, 2025
I:00 PM
. C0HBlIl0illll8/SIRtt{GIH AilD fHISHI}{G Cllllrc nith Shdma : Berenii
, t hour 15 minutes @ $60.00
.
, This clinir style session will include circuit rotatisn for mnditioning and , fitness exercises for the first and tonslude with finithing exercises. .
, Age: Born 2011 and older
, Leuel: lntermediate/Aduanced
i
cHtct( coDE BAtAllcE
Powered by
Our Development
Our Sessions Our Clinics
Our Consults FGC Progrom ,.:{iir'* tf':+r ",,r'fr:ititr*t Our Lob Our Stoff
0ur Testimoniols
I{EXI SEEI(
a
:
1': r* iS aJ I
+i_! iii,i"i
:
3 spots left l
Nrsc rrmss )
acuity ! scheduling
Exhibit C
Other Soccer Facilities
e
\
\
(}
l-i5
\
\L
c
\n
:*; it. r
i,;1:.
iE'
,l
UD
\
\
\
$
II
E
i
S 0rffe Co*na
. .{a..:,..:'......:.:t. :
. :.5,;::,.:,.1.1,.:,,, . ]i"hrSr'N"'si
-sS'
;,:,trir.,.:r..rri:r:.,:r{r\,
':.,''. a.trt',:.:it.:,.,'..'. t{}. .t :tt;t::..::,.r;ir_r.:t r \jY.. :.::.::.:1:t-:,: ::-:i:!t . \, '
"':t)
'':"":: "' I=. : :. ::, ':.. :: :a': .L)
:\5
RJ+
' ,;;;,.;,,r, 'q
-)\l(.: : ,. a:: .,: a )>...: .,...,,t..:....: ..,......... \: .:. .\\ \lxvtoF
. . . .:; ..,: . .,.. ,., .., \,
!,,
$s-
*.l*-:
Qr\di
i
$).</
r)u
A-:
\-,
--rBr
d\S
'-(
aU,e?
NP
B
'=!1S
,:t-E
*,
a+.
taz.
r_19:
.:f,..
€'+#:.
_:ffi|-w
-.__=
. .!.-.'
),;\& :
fi
'-F--|
)*"t
\.i
J
r*-J
**r*
.d.:5
"..:
;"
(-,1
(.\
J/*s::\i .-.i*-
r
\
\:
.,.€
',;*rN*$
s
-$
N
.,::,];€',
'+ a a ::a-
i.'
t ;i+.r=-3 .-"'' - r. :
;4.
i
:
:* .,
{
I
..\-
{-"i.
-J\-
r\*.4
**),1,,.
-,X J*"!!-) :. :: t
;'al !*
lil-/ -..'r
1r,.1, l-'
i:'{, *+-
1.r +..-
'-".--i u
-,
/\r{/fit/lr! trrl5 wfil "w
^wwwn g qwl
.-.i.,1
.i.
i$:=1i:93?+a'
Exhibit D Noise Studies
lrd
erk*7
I,;!
l,
ilIOISE MONITONING IIELD REPORT
Site Map
Proiect ilama: Fit 7 Sports Lab Development Project
"g;trf{tx,# u- "*'c' t1 &o,
Date:;lrtLq Site Number: e
Measured By: Annalie Sarrieddine
MeasurementStartTime: f, Ba 1,.,
Measurement €nd Time: t, q s- e n'
Total Measurernent Time: 15 mln.
Noise Meter Model: Larson Davis Soundtrack LxT Calibration: 94.0 {dBA} Meter Settin8: A-Weighted Sound Level (StOw)
Session File Name: L *b r?^*x. R rt s
Primary Noise Sources, lr/r*nto et;j ara,/r<, ,/ /l* *t
1. 2.
3. 4.
5. Other Noise Sources During Monitoring
Time:
IMPACT re
Data Summary
Noise
Scale
Noise level
{dBAI
L.c {zt
L.r* 61-?
Lrxn ?e. z
Time:
Time:
Time:
fime:
Additional Note$;
/tl
SCIE}ICES
,'}
LUt *'
{"
@ ff*e*e: I.d ? 5p6r1s L*b *srereq**rrlt Project
HSfSg [,t0illT0RlilG fIELD REPORT
1. 2.
3. 4.
5. t \'',
$ileMap
t:t
Tirne:
Time:
Time:
IJZ tr< z t, *t --1
Time:
Time:
rtc//
lf'lPACf
'71,/t,n*t.L A'. /'/ /rrel 6 7/VQr-s
dfr-, 4/;rrt ''^'44'{14/ iL-,:, rca*L^7 ,at *il&
{r-u^*j }.
'c1-J
t/L,r* (ilr,ll, ffut,, lr,^7 ff,&*
0"
7 r, a7 f*a tsoel<-S
i",.la::r -.€ Ls.a: cn: !-^r"_i. I*.._< 3;t'5
;z;;C;L-,s ctA'*1'< =*'t' F*
5*t* il*ex*$*r: /i?. =-+ I l-.f
$6em,st* fu **r*rd* Sarmedd{+l*
. &i*see'mrst S,qprt Tilme: ti i 1 5k,
, x*smslerqt{*dy*rlt*: {, {q f*. *
r+qa ildexs**#'slent Tiine: 15 rnin.
W*$* as*trs *itdei: La.son Oavis Soundtrack !x? Calibraticn:94.0 {dBA} &ffi*r Srttirry: *-l{eigbted Sound Level {SLOW}
5***mnfxk H*ne: 4*, A *A^.Za€ 5
*nm**?l*ai:escurcer,
lur, , *e-n, lt h'-/*, ft*., l*ourr.. , , da<c-{
; &b summary Otherf{olse Sstffeg Oudng Monitortng
f*si5e
!c*f*
Noise Level
{dsA,
L.c f?. t
L* V't. v
L*t" s*+. 7
AdditionalNoks:
$cttilcts r/4- i-r;u t*4e:
NOISI MONITORING FIELD REPORT
Project Name: Fit 7 Sports Lab Developrnent Projeet
Monitoring Location: Soo"-. C-. \,t-a
J
Date: I lzs-lzrzl Site Number: 3 (^,1r'V)
Measured By: Annalie Sarrieddine
Measurement Start Time; ?: o o J511
Measurement End Time: ?l f f ? n
Total Measurement Time: 15 min.
Noise Meter Medeh Larson DavisSoundtrack LxT
Meter Setting: A-Weighted Sound Level {StolAr}
Session,FileName: L*+ - D-X*- ?ol
Calibration: 94.0 {dBA}
Data Surntnary
Noise
Scale
Noise Level
(dBA)
L.q (o. s-
L," 'rb.q
Additionat
HT'5:
Site Map (Lab Five Soccer Facility - Pacoima)
PrimaryNoisesources: 7*h^, L. I d"1,,^h, ft"tt.,, ?*.1r* &.r-"ip Other Noise Soufces During Monitoring
1.-fl, -€L^-- rimet-V:o qt
rime:-3: Q *
Time:{g
4. 5.
lime:
Time:
l, *fir, ? /r?
IMPACTT
sclEltcEs
NOISE MONITORING FIELD REPORT
Project Name: Fit 7 Sports Lab Development Project
S'o"<-t Tl.l f: t1
Site Number: 3 ( o.1n ^)
Measured By: Annalie Sarrieddine
Measurement Start Time: L' .' t a ? t'1
Measurement End rime: 6 : t s' fr'l
Total MeasurementTime: 15 min.
Noise Meter Model; Larson Davis Soundtrack LxT
Meter Setting: A-Weighted Sound Level {SLOW}
Session File Name: Lx F - D*L ?oP
Primary Noise Sources , fo, k; ^ n l" l- Ae /';r. /',1
')t
Calibration: 94.0 (dBA)
Monitoring Location:
Date: I lzf I zoz 3
Data Summary
; Noise i Noise Leveli1
I Scale : {dBA}
Site Map (Lab Five Soccer Facility - Pacoima)
, G, f-L",,-s, il,s;", Sor.., C''
/.1:": v.J'
Other Noise Sources During Monitoring
f : r{
Time:
Time:
Time;
Time:
\/t
1. {:*' /./o ^ R;^ "i Time:
--2.
3. A
5. Additional Notes:
(7^n .5 t./ L/ 1- o. lr r- /n l*ar.*',^.r De o D 1,2 a[.'^rl ni:--J--f,-t.Tl- Qr.
IMPACT
SCIENCES
NOISE MONITORING FIELD REPORT
Project Name: Fit 7 Sports Lab Development Project
9'oc.--r Tl.l t t1
Site Number: 3 ( o.1r, ^)
Measured By: Annalie Sarrieddine
MeasurementStartTime: 6.' t a 7 4
Measurement End rime: 6 : t s' fA
Total Measurement Time: 15 min.
Noise Meter Model: Larson Davis Soundtrack LxT
Meter Setting: A-Weighted Sound Level {SLOW)
Session File Name: Lx b - D*L 2o&
Primary Noise Sources , f^, k; ^, l" k fre /;r. /_7
')d
Calibration: 94.0 (dBA)
Monitoring Location:
Date: I lzf / zoz 3
Data Summary
i Noise i Noise Level
, Scale (dBA)
I
L"o i G q.L
Site Map (Lab Five Soccer Facility - Pacoima)
, G, /}"'ns, il";", So"u' C*
/"t-:"i l1 ,
Other Noise Sources During Monitoring
e: tS-
Time:
Time:
Time:
Time:
\/
1. d*' /4oak;^1 Time:
-
2. 3.
4. 5.
Additional Notes;^""
--:-
*Gan <s tt o,c
"oJ,!:J-L*p^*t1\ --p"
o p ta c\,^r:1 ,
--t-+l--(/JJ
IMPACT
SCIENCES
1 To: The City of Baldwin Park Planning Commission
From: Susan Cole, 14419 E. California Ave, Baldwin Park:
Subject: CP 23-05 & PR 23-21
Submitted via email to Nick Baldwin ([email protected]) 3:30 pm 3/20/25
Regarding the application CP 23-05 & PR 23-21 before you for review on March 26, 2025, to over-build an Industrial property located at 14412 & 14424 Joanbridge St., Baldwin Park, my neighbors and I live right behind the subject properties on residentially zoned properties on California Avenue. We are absolutely opposed to this project. I have attached signed petitions and letters that were signed when this application first went before the Planning Commission before the project was continued to a date uncertain, and we are definitely still opposed to the proposed project. (Exhibit A) I’m sorry this document is so long, but with only 5 minutes to address all the neighborhood concerns at the public hearing, and with the requirement that any decision appeal or legal dispute requires the documentation of disputed facts, I need to be as clear as possible.
The applicant for CP 23-05 & PR 23-21 is still wanting to build a new, twenty-five foot (25’) tall, 14,518 square foot, two story concrete structure to wrap around the existing 6,781 square foot building on 14412 Joanbridge St., resulting in a 21,299 square foot soccer complex. The massive concrete structure is required in order to support four (4) new elevated soccer fields, with the biggest footprint possible and the least amount of on-site parking possible. The existing 6,781 square foot industrial building at 14412 Joanbridge St. is currently being used to house one large soccer field (Exhibit B) but the property owner wants to expand the Futbl Game Changers business located there to add 4 new boutique, smaller soccer fields to maximize revenue and accommodate more paying customers.
These smaller type soccer fields, such as SOFIVE soccer, located at 699 S. Barranca Street, Covina and LAB 5 Soccer Complex in Pacoima and Gardena, have become a popular trend to allow what is called “5x5 soccer play”, whereby small, usually adult, teams of 5 players each team can train and play intense, competitive soccer. (Exhibit C). The SOFIVE soccer facility in Covina and LAB 5 Soccer Complex locations were referenced in the applicant’s noise studies, a part of the administrative record, as examples of similar noise generation uses. (Exhibit D) 2 The business description provided by the applicant, not the business owner, states their initial intention is to offer only small group training sessions within the huge 21,299 sqft. soccer complex facility. However, with the investment costs associated with the purchase of the industrial property, design fees, and the grading/excavation/construction costs required for the completion of the soccer complex facility, other more lucrative and intense uses can also be offered and utilized at the completed facility. There are no Conditions included in the draft Conditions of Approval for this project that would limit the use of the soccer facility to just small training groups. This lack of constraints leaves the door open to allow other unexpected uses at the completed soccer complex facility for large functions. Functions such as 5x5 soccer games, multiple-team competitions, multiple-team scrimmages, soccer birthday party rentals, and other noise/trash/ traffic generating uses would be occurring on 5 soccer fields, simultaneously! The draft Conditions of Approval also don’t specifically state hours and days of operations, allowing a 24/7 day and hour operation.
The object of any business is to be as successful as possible and to grow the business as much as possible. I believe this commercial soccer complex facility would be the same, as the property owner would want recoup the millions of dollars invested just the purchase and development of this property. Any and all entitlements granted by the Planning Commission are attached to the property, so the property owner can sell the rights to construct a soccer facility complex at this location, along with the property, only constrained by what is included in the Conditions of Approval. At this time, having only access to the 12/13/23 draft Conditions of Approval, the project as proposed would allow the construction and use of a 21,299 sqft. structure; 25’ tall; located within 10’ of residential homes; covering 84% of the lot in a zone where only 50% lot coverage is allowed; providing insufficient parking; generating noise, light and traffic levels that exceed the required standards of the Baldwin Park General Plan and Baldwin Park Municipal Code; with a use that is inconsistent with the Baldwin Park General Plan.
Per the 3/17/25 meeting with Nick Baldwin, Baldwin Park City Planner/Acting Community Development Director:
3 • The CEQA review for the revised CP 23-05 & PR 23-21 application was changed from the originally submitted Mitigated Negative Declaration to a Class 32 categorical exemption review. This change favors the applicant because the Class 32 Categorical Exemption requires an even lower lever of project review than did the originally submitted Mitigated Negative Declaration. The draft Mitigated Negative Declaration clearly showed that the prosed project would have a negative environmental impact, which is probably why the applicant chose to use another, easier and looser type of environmental review.
The Class 32 Categorical Exemption was initially created by the State of California to expedite housing in-fill development. This CEQA exemption can only be used to shield a project from an in-depth environment review if the proposed project can be shown to be consistent with the Baldwin Park General Plan and the Baldwin Park Municipal Code. This project is not consistent with either the Baldwin Park General Plan or the Baldwin Park Municipal Code, as illustrated below.
Therefore, the Class 32 Categorical Exemption cannot be used for CEQA review for this particular soccer complex facility project. An Environmental Impact Report (EIR) is required.
• Per N
ick Baldwin, Baldwin Park City Planner/Acting Community Development Director, the Design Review PR 23-21 application, site plan, and elevations have only been revised to remove the original reduced rear yard setback Zoning Variance application, but the proposed 10’ rear yard setback now requested still does not meet the requirements of BP Municipal Zoning Code Sections 153.050.030 & 153.050.030.A2, which clearly requires a minimum 20’ rear yard rear setback.
Table 153.050.030 Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I
Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I Additional
Regulations
Rear yard setback - minimum
lot adjacent to a residentially zoned lot
10 ft
10 ft
10 ft
10 ft
10 ft
153.130.030
4 153.050.030 (A) (2) Wherever a commercially or industrially zoned lot shares a property line with an exclusively residential or a mixed-use zoned lot, any exterior new structure, or addition to an existing structure, that exceeds one story in height and that faces any rear or side lot line shall be set back twice the required setback.
In addition, the original, existing buildings on the proposed project Industrial site have an existing 40’ rear setback (14412 Joanbridge St.) and an existing 50’ rear yard setback (14424 Joanbridge St.) as shown on the submitted site plans There is no precedent to approve such a drastically reduced rear yard setback. A Zoning Variance is required to be added to this review, for the currently proposed reduced rear yard setback.
• The submitted site plan proposes a front set back of 3’; BP Municipal Zoning Code Section 153.050.030 requires a front yard setback of 5’.
A Zoning Variance for a reduced front yard setback is required. • The submitted site plan proposes a lot coverage of 84%; BP Municipal Zoning Code Section 153.050.030 only allows a lot coverage of 50%.
A Zoning Variance for lot coverage is required.
• The submitted site plan proposes a Floor Area ratio of .88 FAR. BP General Plan Land Use LU policy 2.5 only allows a FAR of .75 in the Industrial land use area. A Zoning Variance for an increase in Floor Area Ratio is required. • The noise studies submitted by the applicant show that the project will create more noise than the BP Municipal Zoning Code Section 153.140.070 and the General Plan Land Use Policy LU2.5 will allow. (Exhibit D) The proposed soccer facility would generate
91.8 d
bA decibels of noise (day time hours)
78.3 dbA decibels of noise (evening hours).
These levels are higher than the Noise Levels Allowed per BP Municipal Zoning Code Table 153.140.070 which are:
55 dbA decibels of noise (day time hours)
50 dbA decibels of noise (evening hours)
• The submitted site plan proposes 39 parking spaces. BP Municipal Zoning Code Section 153.150.040 Parking requires 152 parking spaces for a recreation soccer facility use of the proposed size. A Zoning Variance to the parking requirements is required.
5 • The proposed project is not consistent with BP Municipal Zoning Code Section 153.140.040.F and General Plan Land Use Policy LU 2.5 which both do not allow any light to spill over from the proposed project into the adjacent residential lots. The applicant’s photometric light survey (Exhibit E), submitted as part of the administrative record as Schematic Light Plan for CP 23-05, ZV 23-01, PR 23-21 for 14412 & 14424 Joanbridge St. Baldwin Park, shows the project as generating a maximum light foot candle measurement of 52.7 – 52.2 fc/foot candle unit of light, with the maximum foot candle measurement of .1 units of light spilling over to the adjacent properties on all sides. It clearly shows that the proposed elevated exterior soccer field sports lights will shine onto adjacent residential properties and will have a negative impact on the adjacent residential properties. The proposed exterior soccer field sports flood lighting does not meet the standards of the City and should not be approved.
• The proposed project is not consistent with BP General Plan Land Use Policy LU 2.5 and BP Municipal Zoning Code Section 153.210.160 which require that new construction on Industrial properties that abut residential properties provide visual compatibility with, and preserve the privacy of, the residential homes. The stark urban design of the proposed project is not visually compatible with the existing single-family homes adjacent to the subject property and not compatible with the existing industrial buildings on Joanbridge St. In addition, the location of the 25’ tall elevated soccer fields along the shared property line with the residential uses will compromise the expected privacy of the residential rear yards. • The proposed project is not compatible with the City of Baldwin Park General Plan Goal and Policies as follows:
o Land Use Goal 2.0 – Compatible Development Standards. The proposed size of the new 21,299 square foot soccer facility and the location of the 25’ tall, elevated outdoor soccer fields, located within 10’ of existing residential properties, is not compatible with existing adjacent single-story, single-family residential development directly abutting the project site nor is it compatible with the mostly single- story industrial development
o Land Use Policy 2.5 – Land Use Intensity/Density. The proposed size of the new 21,299 square foot soccer facility and the location of the 6 25’ tall, elevated outdoor soccer fields, located within 10’ of existing residential properties will cause negative impacts on the adjacent residential and industrial properties regarding noise, inadequate parking, light and glare, privacy, differences in scale and visual incompatibility, as detailed above.
o Land Use Policy 2.6 – Lighting on Commercial/Industrial Properties.
The proposed size of the new 21,299 square foot soccer facility and the location of the 25’ tall, elevated outdoor soccer fields, located within 10’ of existing residential properties will cause negative impacts on the adjacent residential properties due to the use of the outdoor soccer sports flood lights for the elevated outdoor soccer fields. The submitted lighting plan (Exhibit E) clearly shows the new soccer fields will generate the prohibited light spillover.
o Land Use Policy 7.4 – Adequate Parking. The design and proposed size of the new 21,299 square foot soccer facility and the location of the 25’ tall, elevated outdoor soccer fields, covering 22,067 square feet of the 26,244 sqft. lot (84% lot coverage) will not leave enough room for the required number of on -site parking spaces and will not provide adequate on -site parking for customers . Inadequate parking will cause patrons of the new soccer facility to park on private property on Joanbridge St., where street parking is prohibited, and to spill over into the adjacent residential neighborhood streets, where street parking is already severely limited.
o Land Use Noise Element NE12 - B ased on the applicants submitted Noise Studies (Exhibit D) the proposed project will produce noise levels above the allowed decibels allowed in residential properties. • As of 3/20/25, there were no Design Review Finding of Fact to review. • As of 3/20/25, the re were no revised Findings of Fact for Conditional Use Permit CP 23-05 to review.
1 To: Planning Commission
From: Su
san Cole, property owner 14419 E. California Avenue, Baldwin Park, CA
3/26/25
Re: Public Comments on 3/26/25 Planning Commission Staff Report CP 23-05 & PR 23-21
Dear Commission: The submitted Staff Report is treating the proposed 21,143 square foot soccer facility complex as if it will be located in the middle of a light industrial business park, surrounded by other Industrial uses.
However, the reality is that the proposed structure and the proposed use are being proposed for a unique location. The unique location is two small industrial lots on Joanbridge Street in north Baldwin Park.
The applicant proposes to merge the two industrial lots, to form one industrial lot which will continue to abut an existing residential neighborhood.
Both the Baldwin Park General Plan and the Baldwin Park Municipal Zoning Code explicitly address any new construction and any new use on industrial property that abuts existing residential properties as being in need of additional scrutiny and special considerations and both guiding documents have specifically applicable policies and particular re
quirements that will apply to this project.
The specifically applicable General Plan Policies are: Land Use Policies LU 2.5 allowed uses, on-site parking, no street parking, lot coverage, adequate setbacks from existing residential development, no noise over the allowable levels, no spill-over light and glare, adequate buffer between new industrial construction and existing residential homes for visual compatibility.
2 The particular requirements of the Municipal Zoning Code are: Section 150.050
.030 lot coverage; Section 153.040.070 noise; Section
153.050.030 larger setbacks; Section 153.140.070 noise; Section 153.140.040 no light/glare; Section 153.150.010 off-street parking; Section 153.050.020 recreational soccer use; Section 153.210.160 privacy and visual compatibility; Section 153.150.040 on-site parking.
The General Plan Policies and Municipal Zoning Code requirements regarding any new uses and all new development on an Industrial property are not suggestions, they are mandates. Unfortunately, the prepared staff report, recommendations and Resolutions regard these mandates as optional and open to unfounded interpretations and capricious changes.
The residents of the California Avenue neighborhood and Maine Street homes request that the Planning Commission deny the Proposed development and use, based on the fact that this application, after being continued for a year in order to allow for revisions to the application’s site plan/elevations and changes to the operation and use, in order to better meet the objectives and Policies of the Baldwin Park General Plan as well as the requirements of the Baldwin Park Municipal Zoning Code, has been re-submitted but the proposed project still fails to meet the objectives and Policies of the Baldwin Park General Plan and has failed to meet the requirements of the Baldwin Park Municipal Zoning Code.
In addition, the presented Staff Report as written, is too full of mis- information, contradictions and outright errors for the Planning Commission to use it as a tool to make an informed decision regarding the proposed 21,143 square foot elevated soccer fields facility complex.
Thus, the residents of the residential neighborhood abutting the proposed, ill-fitting soccer facility complex construction and use, request denial of the project.
3 To further support the request of denial, the following facts illustrate the defi
ciencies and inadequacies of the Planning Staff review and report.
Planning Staff Report Discussion section pg.2
The staff report describes the proposed project as a request to “allow a re
creational facility within an existing commercial complex.” The existing buildings along Joanbridgre Street are individual, freestanding industrial buildings. The proposed site is not “in a commercial complex.” A non-tax generating service use is not consistent with the General Plan Policies and Municipal Zoning Code requirements for the tax-generating industrial zone.
The staff report identifies the proposed construction as a “parking structure” and states that there is a “second floor above the parking area as having 3 outdoor soccer fields”. The proposed site plan shows 4 pl
aying fields.
Zoning Section pg. 2:
The staff report states that “The proposed parking area and outdoor soccer
fields will measure the same height as the existing building, a total of 25’ measured from finished grade to the highest point of the protective mesh wiring on the second floor.” The staff report further states, this is ”making the building height compliant with code standards.”
Response: However, the staff report then states that the project, as prese
nted, is in compliance with the Lot Coverage development standard and doesn’t need a zoning variance at all because per the definition of Lot Coverage. “The percentage of the total lot area covered by enclo
sed structures and/or carports, but excluding
uncovered steps, driveways, walks, covered patios, terraces and 4 swimming pools” doesn’t apply to this project, because “the subject proj
ect does not propose any new enclosed “structures” on the first floor”. Even though the project was described as a “parking structure” and it is obviously has a foundation on the first floor as well as constructed bathrooms, permanent concrete stair wells and an elevator. This statement is incorrect.
The subject project is indeed proposing a structure on the first floor because,
as described in the staff report project descriptions as quoted above, the first floor structure will be the “parking structure”.
Further, the parking structure is constructed and operates as a “carport’ sheltering the customer’s cars. In addition, the definition of a structure in BP Municipal Zoning Code 153.220 is: “Structure. Anything constructed or erected, which requires a fixed position on the ground or is attached to a building or other structure having a fixed location on the ground.” Clearly, the proposed 14,518 square foot concrete slab designed to hold the proposed exterior soccer fields construction with su
pporting concrete pillars and walls, as shown on pg. A-1.3 (sections) is a structure.
Additionally, the staf f report describes the outdoor soccer fields as being on “
the second floor above the parking area” as and the
architectural plans, pg. A1.2, identify the “upper floor” as including the outdoor soccer fields.. Page A1.2 goes onto call out that area of the second floor above the parking area as a 14,518 square foot concrete slab, covering both the 14412 &the 14424 Joanbridge St properties.
By adding the new 14,518 sqft. parking structure area with the 6,625 sq
ft. floor area of the remaining existing building on 14412 Joanbridge Street, you get a total of 21,143 square feet of lot coverage over a 26,244 square foot lot which equals a lot coverage of 81%. Based on this corr
ect information, the lot coverage is 81% which does not meet 5 the requirement of BP Municipal Code, which is 50% allowed, as sho
wn in Table 153.050.030 below.
Table 153.050.030
Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I Additional Regulations Development Standards for Commercial and Industrial Zones Development Standards NC GC FC I-C I Additional
Regulations
Lot area - minimum 5,000
sf
5,000
sf
4 ac 40,000
sf
5,000
sf
Lot depth - minimum -- -- 200 ft 200 ft --
Lot width - minimum
Standard lot
Corner lot
50 ft
55 ft
50 ft
55 ft
300 ft
300 ft
150 ft
150 ft
50 ft
55 ft
See Figure
153.050.030- 1
Lot coverage - maximum 50% 50% 50% 50% 50%
--
--
5 ft
5 ft
5 ft
10 ft
10 ft
15 ft
5 ft
--
Front yard setback - minimum
standard lot
corner lot
lot adjacent to a residentially
zoned lot
Same as front yard requirement of
residentially zoned lot
153.130.030
Side yard setback - minimum
standard lot
lot adjacent to a residentially
zoned lot
--
10 ft
--
10 ft
10 ft
10 ft
10 ft
10 ft
--
10 ft
153.130.030
Rear yard setback - minimum
standard lot
lot adjacent to a residentially
zoned lot
--
10 ft
--
10 ft
10 ft
10 ft
10 ft
10 ft
--
10 ft
153.130.030
Building height - maximum 25 ft 35 ft 6
stories
35 ft 25 ft 153.130.040
6 153.050.030 (A) (2) Wherever a commercially or industrially zoned lot shares a property line with an exclusively residential or a mixed-use zoned lot, any exterior new structure, or addition to an existing structure, that exceeds one story in height and that faces any rear or side lot line s hall be set back twice the required setback.
Therefore, the project is not in compliance with the Lot Coverage requirement and requires a Zoning Variance to proceed, which has not been included with the project application. Therefore, the project application is incomplete and cannot be approved.
Architectural Design Section pg. 2
The submitted elevations show the front walls of the proposed 21,143 sq
uare foot block building with a 12.5 foot tall wood façade with a 12.5 foot tall black wire screening on top. The mesh screen wire will be 77% open per the submitted plans. The sides of the huge building will utilize an existing concrete block wall with 4 feet of wire mesh between block wall and the bottom of the concrete slab that supports the 4 soccer fields to inexpensively cage in the sides of the structure. On the south side of the proposed structure, where the soccer facility will abut the residential homes, they have added additional diagonal sheets of the mesh caging wire. The proposed 12.5’ foot tall “decorative wire mesh screening”, as shown on the submitted elevations and on pg. M-1.1 of the plans is, per the applicant, to screen the soccer fields. However the mesh wire fence will not screen anything. They will not screen the outdoor soccer field from view; nor will the 77% open, black caging wire screen block any noise, lights or trash from exiting the soccer field complex property onto the residential properties directly below the 25- foot tall, towering structure. Instead they will give the impression of a
12.5’ prison fence on top of a 12.5’ prison block wall.
On page 3, the staff report states that “As a condition of approval, the applicant will also be required to install mature trees and plants to 7 soften the south elevation and create an additional barrier between the curre
nt residential properties abutting the soccer facilities.” Response: In fact, the Planning conditions of approval do not contain this condition. Therefore, if the Planning Commission were to approve the submitted draft Resolution PC 23-28 , the applicant would not be required to provide any type of buffering barrier between the existing residential homes and the proposed huge soccer facility complex structure, thus making the project inconsistent with the General Plan and nonconforming with the Municipal Code.
Th
ere is a condition (o) which requires a landscape plan, but it doesn’t include the requirement to install “mature trees and plants to soften the south elevation” either.
In addition, the definition of mature trees, per the BP Municipal Zoning Code 153.220.140 is: “any tree located in the front yard,…..rear yard setback and is greater than 18” in diameter or is greater than 40 feet in height."
The submitted elevations and site plans show on pg. A-1.1 that the 10’ wide rear yard setback is completely paved for parking, except for a skinny 2 foot 3 inches of planting area next to the existing 6’ tall concrete block retaining wall which runs along the rear property line, dividing the existing residential homes from the Industrial properties.
The applicant is proposing, as shown on pg. A-1.3 (sections) to re-use the existing concrete retaining wall and attach the wire caging mesh fencing to the top of the wall and connect the fencing to the roof of the parking structure, at the base of the soccer field platform, caging in the parking area along the southern property line.
Obviously, mature trees more that 18” in diameter and/or 40 feet tall cannot be planted in the proposed skinny 2’3” planting area, let alone 8 “mature plants to soften the southern elevation.” In fact, the existing ol
d block retaining wall, which was first constructed in the 1970’s and was repaired in the 1990’s, is placed right on the property line and leaves no room for the applicant to plant anything that could soften the block wall or hide the wire mesh caging fence to be constructed on top of the wall nor create any additional barrier, as erroneously stated in the staff report.
The submitted elevation pg. A-1.4 and pg. A-1.3 falsely show nineteen (19) 30 foot tall mature trees planted in the 2’3” rear setback and growing through the wire mesh wire fencing to soften the rear elevation, when in reality, this is impossible. Section 1 on pg.A-1.3 shows the same trees planted in the 10’ rear yard setback with the cars parked in the drive aisle while Section 4 shows the same view with the cars parked on top of the same mature trees.
To sum up, the staff report promises a condition of approval to ensure this landscaping buffer requirement. The conditions of approval are missing any such condition. It is an impossibility for the applicant to construct the project according to the submitted plans.
Additionally, the General Plan also calls for a “buffer area between any new construction on an Industrial property that abuts existing residential properties”, which has been demonstrated to also be an impossibility with the proposed huge structure design.
Therefore, the architectural design and landscaping for the proposed project is not consistent with the BP General Plan and does not meet the development requirements of the Municipal Code. However, the Planning staff report is recommending approval of the project, another in
stance of mis-information, contradictions and outright errors in the staff report which will make it impossible for the Planning Commission 9 to use it as a tool to make an informed decision regarding the proposed 21,
143 square foot elevated soccer fields facility complex.
Business Operations Plan and Hours of Operation. Pg. 3
Planning condition of approval (a) of the draft Resolution PC 23-28 do
cument requires “that the property shall be developed and maintained in substantial accordance with the Business Plan Narrative, included as Attachment 3 to the Staff Report, dated March 26,2025 and min
or amendments to the business operations shall be subject to the discretion of the Community Development Director.” There is no Attachment 3 entitled “Business Plan Narrative” attached to the staff report. Therefore, there are no legal limits or boundaries on the times of operation, types of uses allowed, number of persons allowed at one time on
the second-floor elevated soccer fields. In addition, no proposed Hours of Operation listed. Therefore, the condition of approval to enforce the “Attachment #3 Business Plan Narrative” would be unenforceable, if approved.
Although the staff report does not provide the applicant’s Business Operations Plan or Business Plan Narrative, it does include a “Training Session” schedule detailing when and how the applicant would want to use the 21,143 square foot, 25’ tall soccer facility complex with 4 elevated soccer fields and one full-sized indoor soccer field for training, sports performances, and recreational uses which are:
o for at least 7 hours every weekday afternoon, evening and night of the year, from before 4 pm – to after 10 pm; o for at least 11 hours every Saturday of the year from before 8:00 am to after 6 pm;
o for at least 7 hours every Sunday of the year from before 8:00 am to after 2:00 pm.
10 o Th ere is a “disclaimer” attached to the “Training Session” document stating “Players must register for sessions,
including recreational use. All sessions and recreational use are booked 24 hours in advanced. Booking sessions
are maxed out and only the number of players noted will be permitted into the sessions. There are no walk-ins
permitted only those players registered for the session will be allowed into the lab. No Exceptions.” However, this disclaimer only applies to the training sessions at the soccer lab.
There are no conditions in the “Training Sessions” document or in the draft Resolution PC 23-28 that would define or limit general hours of operation for the soccer complex facility pertaining to the use of the proposed gym, the proposed 2 meeting rooms, and the 4 offices or any other more intense uses.
There are no conditions in the “Training Sessions” document that would define, or prohibit any other activities, such as private parties, 5x5 soccer games, scrimmages, etc. in addition to the 4 - 10 pm weekday & 8 – 6 pm Saturday & 8 – 2 Sunday schedules of the training sessions.
There are no conditions in the “Training Sessions” document that would define or limit the number of members, i.e. paying customers at the facility at any given time, or limit any other activities.
There are no conditions in the “Training Sessions” document that limits the applicant/property owner/business operator to only the training sessions, leaving the door wide open to any type of additional uses, which is in conflict with the reason for the Conditional Use Permit approval process.
11 The “Training Sessions” document estimates that there will be up to 11 peop
le on each of the 4 soccer playing fields, including the full-sized interior soccer field, at any given time, not including one or two players on the 1,643 square foot practice soccer field. This estimate would equal 44 members of the private soccer facility complex, playing and parking at the complex at any given time. In addition, you would need to account for the number of staff and additional members who will be using the proposed gym, the proposed 2 meeting rooms, and the 4 offices. Approximating 2 people in each of those facilities at any given time will generate the need for at least 14 more parking spaces added to the needed 44 off-site member and staff parking spaces needed and the proposed soccer facility complex will require at least 54 parking spaces to be available at any given time to avoid negative parking and traffic impacts on the adjacent industrial businesses or on the adjacent residential use.
The staff report erroneously states that ”the required parking for a recreational facility is one parking space for every employee present at the facility and one additional parking space for every class room” equaling only 13 required parking spaces. The fact is that, per Municipal Code per section 153.150.040, that mistakenly stated requirement is for an elementary or secondary school (private), a use which is not even allowed in the Industrial zone at all.
Actually, the Municipal Code per section 153.150.040, see below, requires 1 space/150 square feet of building area for a commercial recre
ational facility, which is what the proposed project really is.
Therefore, based on the proposed 21,143 square footage of the proposed soccer facility application, the required number of parking spaces is 152 spaces, as shown below.
12 Table 153.150.040 Required Number of Parking Spaces
Number of Required Parking Spaces
Land Use Minimum Number of Spaces Required
Commercial Recreation
a. Health/Fitness Club
b. Billiard / bowling alley
c. Arcade/internet cafe
a. 1 space/150 square feet of building
area (152 spaces required)
b. 3 spaces /100 square feet of building
area
c. 1
space/150 square feet of building
area
School
a. Elementary or secondary (private)
b. High School (private)
c. Specialized and vocational
a. 1 space/employee plus 1 space
classroom (13 spaces required)
b. 1 space/employee, plus 1 space/2
students in 11th and 12th grades
c. 1
space/35 square feet devoted to
instructional services plus 1 space per
classroom (468 spaces required)
The applicant is proposing 39 parking spaces. As previously shown abo
ve, based on the information submitted as part of the applicant’s “Training Session” schedule, when the proposed soccer facility complex is used only for training sessions, it will generate a need for at least 54 parking spaces to be available at any given time to avoid negative parking and traffic impacts on the adjacent industrial businesses and on the adjacent residential use.
Therefore, the project is not in compliance with the BP Municipal Zoning Code Parking requirement 153.150.040 and requires a Zoning 13 Variance to proceed, which has not been included with the project application. Therefore, the project application is incomplete and cannot be approved.
Previous facts point to the ability of the applicant/property owner to us
e the facility for other more intense use, as anticipated by the BP Municipal Code section 153.150.040. Since there are no Planning conditions of approval included in the attached PC 23-28 draft Resolution that would preclude the applicant/owner from using the facility for more intensive uses such as 5x5 game play, facility rental for birthday parties and special events or any other use, and there is no Business Operations Plan or Business Plan Narrative document that defines the proposed hours of operation, and there is no separate condition of approval that address the probable more intensive use of the property, there is no reason to believe that the applicant /property owner /business owner will limit the use of the subject commercial soccer facility complex to only training sessions.
The staff report states that conditions of approval have been included in the draft Resolution to address “issues that could have an impact on surrounding businesses and residents.” These impacting issues are:
structure setbacks, lot coverage; parking; traffic; noise; light and glare; trash generation; preservation of the privacy of the adjacent residential properties; differences in scale and visual compatibility.
Response: Unfortunately, the draft Resolution PC 23-28 does not include a condition of approval requiring compliance with the BP Municipal Zoning code regarding lot coverage.
Draft Resolution PC 23-28 does not include any condition of approval requiring compliance with the BP Municipal Zoning Code regarding structure setbacks.
14 Draft Resolution PC 23-28 does not include any condition of approval re
quiring compliance with the BP Municipal Zoning code regarding the required 152 number of parking spaces.
Draft Resolution PC 23-28 does not include any condition of approval requiring the business operator to modify the design and use of the proposed soccer facility complex to definitively show with a revised noise study that the project can meet requirements of the BP Municipal Zoning Code regarding noise.
Draft Resolution PC 23-28 does not include a condition of approval requiring the business operator to modify the design and use of the proposed soccer facility complex to definitively show with a revised light photometric study that the project can meet requirements of the compliance with the BP Municipal Zoning Code regarding light and glare.
Draft Resolution PC 23-28 does not include a condition of approval requiring consistency with the BP General Plan regarding preservation of the privacy of the adjacent residential properties.
Draft Resolution PC 23-28 does not include a condition of approval requiring consistency with the BP General Plan requiring adherence with the BP General Plan regarding differences in scale and visual compatibility.
In fact, draft Resolution PC 23-28 does not even include a condition of approval requiring compliance with the submitted site plan and elevations for the project. So any approval of the draft Resolution for PC 23-28 by the Planning Commission would allow the applicant, or whoever next purchased the entitled property, to build without constraints and to use the soccer facility complex without constraints. 15 Therefore, the statement in the staff report that “conditions of app
roval have been included in the draft Resolution to address issues that could have an impact on surrounding businesses and residents is misleading and incorrect.
Traffic and Parking pg. 3
The Planning staff report states that, based on the “Training Session” do
cument, “staff does not believe that the proposed use will cause any adverse impacts on the surrounding industrial area”. Based on a 2024 environmental impact traffic study which calculated the calculated trip generation associated with a similar soccer facility complex, the Pacoima Fit 5 soccer complex, the traffic study shows on pg. 4, that 141 trips were generated on weekdays, between the hours of 4 – 6 pm.
After a deduction of 56 trips for “credit “ because the proposed project is in an industrial zone, the project was assigned a modified trip generation of 85 trips for 2 hours during 4-6 pm on a weekday evening.
Response: The study did not include the trips that would be generated on a Saturday, which is the longest and busiest day of the week for the proposed soccer facility complex, per the applicant “Training Sessions” estimation of number of players. Therefore, the estimated number of 85 trips generated daily by the proposed soccer facility complex is lower than would be realistic. The un-modified original number of 141 trips generated by the proposed facility in Baldwin Park is more realistic, although still under-counted because it still does not include the busiest Saturday traffic. However, the modified number was used to allow the applicant to avoid additional CEQA review beyond the minimal Categorical Exemption proposed by staff. The surrounding industrial area will indeed be negatively impacted when the arriving soccer players cannot find onsite parking at the proposed soccer facility complex and will try to first park close as close to the facility as 16 possible, even if it is on Joanbridge Street where there is no street parkin
g allowed and most businesses have posted “no parking” signs in front of their buildings. (see Exhibit J)
Unfo
rtunately, the staff report did not even attempt to calculate the negative impact of the soccer facility complex parking space deficit on the adjacent residential properties, as required by the City of Baldwin Park General Plan and Municipal Zoning Code.
The “Training Sessions” document lists the times that training sessions will be offered and the estimated number of soccer players playing at any given time. The Training Session envisions 54 players, aged 5 years old to 17 years old and 8 staff participating in training sessions, sport performance and recreational use, for a total of 62 people using the facility during the weeknight hours, from 4 – 10 pm when industrial zone businesses will be concluding their day shift and starting their night shift. 62 people trying to park in parking facility with only 39 parking spaces. Since the majority of students are projected to be young tender-age minors and under driving age, parking spaces must be allocated for the designated driver of each student which factors into the need for much more than 39 parking spaces at any given time, each weekday during the hours of operation, not including the increased number of soccer players attending the training sessions on Saturdays. This does not even include any additional parking demand generated by other types of unlisted activities that the soccer facility complex is allowed to offer, such gym use, meeting room rental, facility rental..
If there are no available parking spaces, the drivers will try to park on Joanbridge Street illegally (see Exhibit J). Since there is no street parking on Joanbridge Street, the drivers will try to park on the adjacent residential neighborhood streets of Maine Avenue or California Avenue. 17 Since both Maine Avenue and California Avenue have severely re
stricted on-street parking available, the continuous parking-seeking traffic on these two residential streets will cause an adverse impact on and undue problems for the residents on California Avenue and Maine Street. In addition, California Avenue is a very narrow, dead-end street, with on-street parking severely limited. Parking-seeking drivers will be forced to drive down a narrow, single-lane California Avenue and then turn around and drive back, without finding parking, but negatively impacting the normally quiet and safe residential neighborhood .
The staff report envisions parents and guardians, aside from generating the 141 new vehicle trips to the proposed soccer complex facility on Joanbridge Street, to be dropping their children off unsupervised in the Industrial area of north Baldwin Park and leaving them there for two hours before returning to pick them up again, rather than parking and waiting at the facility. This is not a realistic or acceptable assumption and has not been shown to be true in the traffic study, which did not include parking statistics.
The staff report states that “a condition of approval has been added to require the applicant to prepare a circulation and access plan to prevent queuing and idling on Joanbridge Street.”
The draft Resolution PC 23-28 does not include a condition of approval requiring the applicant to prepare a circulation and access plan to prevent queuing and idling on Joanbridge Street.”
The staff report states that “conditions have been included in the Planning Commission Resolution to address potential parking issues.” The draft Resolution PC 23-28 does not include any conditions to address potential parking issues.
18 Therefore, regarding the overwhelming detrimental traffic and parking defi
ciency impact of the proposed soccer facility complex on the surrounding existing industrial and existing residential uses, the project will not only require a CEQA Environmental Impact Report, the project is not consistent with the City of Baldwin Park General Plan nor in compliance with the City of Baldwin Park Municipal Zoning Code and cannot be approve as presented.
Noise pg. 4
The staff report states that that “In order to assess the Project’s noise compati
bility with the Project area, a noise survey and measurement were conducted at SOFIVE Soccer Center located at 699 S. Brarranca Avenue, in Covina….This location was selected as a representative noise source because of its urban location and its operational characteristics are similar to the Project. This facility includes ten soccer fields of similar size as proposed by the project. The noise meter was placed near three fields that were being used…..at approximately 10 feet from the noise meter,… at approximately 30 feet from the noise meter and approximately 50 feet from the noise meter.” These activities are representative of the proposed conditions at the Project Site and also reflect comparable setback distances from the properties to the south of the Project Site.”
Response: This is the third noise study submitted for this project. The first two noise studies took place at the commercial, ground level LabFive soccer fields in Pacoima and Gardena and clearly showed that the similar type of soccer fields, proposed for Joanbridge Street would generate a level of noise that is unacceptable per the Baldwin Park General Plan and Baldwin Park Municipal Zoning Code (Exhibit N Pacoima & Gardena Noise studies ) This is without factoring in the fact 19 that the soccer fields on Joanbridge Street are proposed to be elevated
12.5 fee
t above ground level which allows noise to travel further and without natural barriers.
Monitoring Field Report
Location Time Maximum
Recorded Noise
Level (dbA)
Average Recorded
Noise Level (dbA
Lab 5 soccer
complex facility
9740 Telfair Ave
Pacoima CA
6:00 pm (day) 91.8 dbA 60.5 dbA
Lab 5 soccer
complex facility
9740 Telfair Ave
Pacoima CA
7:00 pm (Evening) 78.3 dbA 60.5 dbA
SOFIVE Covina
soccer complex
facility
699 S. Barranca,
Covina, CA
5:39 pm (Evening) 74.4 dbA 59.1 dbA
SOFIVE Covina
soccer complex
facility
699 S. Barranca,
Covina, CA
8:30 pm (Evening) 64.9 dbA 56.8 dbA
20 In the third noise study, the SOFIVE Covina study performed at SOFIVE in
Covina (see Exhibit N for SOFIVE photos), the noise study once again shows that the soccer field use proposed for Joanbridge Street would generate a level of noise that is unacceptable per the Baldwin Park General Plan and Baldwin Park Municipal Zoning Code. (Exhibit N), see tabl
e above.
In the SOFIVE Covina noise survey, the noise meter was placed 10’, 30’ and 50’ away from the soccer fields. In the case of the project site, the noise will be generated a mere 10’ from the residential property line and elevated 12.5’ above the ground and therefore the noise that will be received on the residential properties abutting the proposed project will be even louder.
The results of the SOFIVE Covina noise study for this project still show that the noise that will be generated by the five (5) new outdoor soccer fields, elevated on the top floor of a new 25’ tall structure, is still louder than the Baldwin Park General Plan and Baldwin Park Municipal Zoning Code will allow. See comparison table above.
TABLE 153.140.070 (C)
City of Baldwin Park Noise Standards
Zone Time Allowable Noise Level (dbA)
Noise Standards
Zone Time Allowable Noise Level (dbA)
Residential 7 a.m. - 7 p.m. (Day) 55
Residential 7 p.m. - 10 p.m. (Evening) 50
Residential 10 p.m. - 7 a.m. (Night) 45
Commercial 7 a.m. - 10 p.m. (Day and evening) 65
Commercial 7 p.m. - 7 a.m. (Night) 55
21 Industrial Anytime 65
As shown in Table 153.140.070 (C), above, the loudest allowable noise levels to be re
ceived by and recorded in the residential zoned homes and yards on California Avenue, behind the proposed soccer field complex is:
55 dbA decibels during the Day (7 am – 7 pm)
50 dbA decibels during the Evening (7pm – 10 pm)
45 dbA decibels during the Night (10 pm – 7 am).
Noise Comparison
City of Baldwin Park (Sec.
153.140.070) Allowed noise level
SOFIVE Covina Soccer Complex actual
noise level
Residential
7 am – 7 pm (day ) 55 dBA
1/3/24 5:39 pm (day)
74.4 dBA maximum
59.1 dBA average
Residential
7 pm – 10 pm (evening) 50 dBA
1/3/24 8:30 pm (evening)
64.9 dBA maximum
56.8 dB Average
It should be noted that the Baldwin Park Municipal Code Noise Stan
dards are measured in straight decibels, but with times designations allowing the noise generated to be compatible with the time of day. The SOFIVE Covina noise study for this project provided the maximum (Lmax) an
d minimum (Lmin) noise generated levels,
which are straight decibel measurements. The Leq noise levels shown in the SOFIVE Covina report is a weighted and averaged noise measurements.
The staff report states “It is noted that the noise meter was placed adjacent to the nearest field and only a chain link fence was between the 22 meter and the noise sources. Thus, no substantive noise-attenuating barrier
s affected the referenced measurements.“
Response: Unfortunately, this is not correct. As you can see from the photos of the SOFIVE Covina photos, Exhibit C - Other Soccer Facilities, the
only chain link fencing on the SOFIVE Soccer, Covina site is around the perimeter of the entire facility. All the individual soccer fields themselves have 4’ – 6’ tall padded wood fences around the playing fields, which do act as noise-attenuating barriers. Therefore, the noise measurement presented in the SOFIVE Soccer Covina report already has the noise-attenuating barrier factored in, i.e. the noise generated by the existing soccer facility will be equivalent to the noise generated by the proposed soccer facility with the proposed 2” thick, vinyl removable padding.
The staff report states that “all off-site properties, including the residential uses to the south of the Project site, would be shielded by a 6-fo
ot-highpadded, would be shielded from soccer activities by a padded wall proposed for the entire perimeter of the second level soccer fields.” Response: Through a discussion with the applicant architect on February 5, 2024, and through research per the attached OSHA regulatory status data(see exhibit R), the “Rockwool” insulation is desi
gned for insulation of industrial piping, roofs and walls. The listed adverse physiochemical hazards are listed as eye, skin and upper respiratory irritation. The attached data also shows that the suggested “Rockwool” insulation is not currently being manufactured into vinyl padding for sports venues.
Per pg. A-1.3 ‘Sections’, of the submitted elevation plans, the 12.5’ tall up
per level of the 25’ tall structure will be wrapped in open metal fencing. The bottom 6’ section of upper-level fences will be lined with removable, 6’ tall vinyl sports fence padding, attached to the open metal 23 fencing with grommets, see Pg. M-1.1 Material Specifications. While any pad
ding may somewhat deflect the noise generated by the proposed elevated soccer fields, the submitted noise measurement from SOFIVE Covina, which is the noise measurement presented in the SOFIVE Soccer Covina report, already has the noise-attenuating barrier factored in, i.e. the noise generated by the existing soccer facility with 4’ – 6’ vinyl- covered wood perimeter barriers, will be equivalent to the noise generated by the proposed soccer facility with the proposed 2” thick, vinyl removable padding.
The 6’ top half of the metal-screened soccer fields will have no noise- attenuating material to impede sound from going through the top halves of the open perimeter fencing and into the adjacent residential and industrial properties. In addition, a hypothetical, unproven solution to the existing noise problem is not a mitigation measure and cannot be used as a pending condition of approval.
Resolution PC 23-28 Planning condition (h) “states : that the business shall be subject to the noise limits defined in the Baldwin Park Municipal Code. Music and microphone use shall be used indoors only; whistles and horns are prohibited.” It has been clearly shown that the project cannot meet the noise limits defined in the Code. This condition should be modified to leave only the restriction regarding whistles, horns, microphones and music.
It has been demonstrated that the predicted noise generation of the proposed soccer facility complex, which has been measured at 74.4 dbA maximum (day), and 64.9 maximum dBA (evening), will exceed the allowable level for noise to be received by the existing residential ho
mes, directly south of the soccer fields, which is, per Table 153.140.070.C of the City of Baldwin Park Municipal Zoning Code: 55 dbA (day) and 50 dbA (evening).
24 Therefore, since the noise generated by the proposed soccer complex faci
lity will exceed the allowable noise levels to be received by a residential property in a residential zone located adjacent to an Industrial zone, the project is not consistent with the City of Baldwin Park General Plan nor in compliance with the City of Baldwin Park Municipal Zoning Code and cannot be approve as presented.
Light and Glare pg. 5
The staff report states that: “the applicant has provided a photometric plan …that is compliant with the Baldwin Park Municipal Code light and glare
standards”.
Response: Unfortunately, this is not true. The applicant has provided a ph
otometric plan which shows the project as generating a maximum light fo
ot candle measurement of 52.7 – 52.2 fc/foot candle units of light, with the maximum foot candle measurement of .1 units of light spilling over to the adjacent properties on all sides. Unfortunately, the applicant has not included a colored photometric survey for the revised rear yard setback. It is much easier to see with the colored diagram.
However, if you expand the photometric survey as presented digitally with the 3/26/25 staff report, you can see that the spillover lighting into the residential and industrial adjacent properties is still there This spillover is also reflected in the accompanying Statistics table, both found on pg.35 (Photometric study) of the staff report and in Exhibit L.
Ac
cording to the Statistics table, on PL1-3 south (the south property line where the Industrial zone subject property abuts the existing residential zone property) there is still a Maximum level of .1 fc of light spilling over the rear property line, even with the increased 10’ rear yard setback.
In addition, it should be noted that the 6’ tall fabric padding, proposed to l
ine the lower half of the soccer metal mesh fencing that surrounds 25 the elevated soccer fields, will only cover the bottom half of the see- throu
gh metal fencing. The top 6.5” top half of the see-through metal fencing will be open and will not prevent any glare from the outdoor sports flood lighting from being seen.
Further, the submitted photometric lighting plan also shows that the li
ght generated by the proposed flood lights for the interior of the Parking structure will also spill over the rear property line, as shown on the lighting schematic for the ground floor lights. The existing, 6’ concrete masonry wall may deflect the headlights of vehicles, but the flood lights are positioned higher than the wall inside the parking structure and the light from these fixtures will spill over the top of the wall for a generation of .1 foot candles.
BP Municipal Zoning Code Section 153.140.040.F and General Plan Land Use
Policy LU 2.5 both prohibit any light to spill over from the proposed project into the adjacent residential or industrial lots.
Contrary to what is stated in the staff report, the draft Resolution PC 23-28 does not include any condition to require the project applicant to demonstrate that the proposed lighting conditions would not result in excessive spillage. However, a condition to require the project applicant to demonstrate that the proposed lighting conditions would not result in excessive spillage is not necessary as the applicant has already shown that the proposed design will clearly result in liht spillover.
It has also been clearly shown that the proposed project cannot meet the requirements of the BP General Plan or the BP Municipal Code.
Therefore, the proposed project is not consistent with BP Municipal Zon
ing Code Section 153.140.040.F and General Plan Land Use Policy LU 2.5. The applicant’s photometric light survey clearly shows that the proposed elevated exterior soccer field sports lights will shine onto 26 adjacent residential and Industrial properties and will have a negative imp
act on the adjacent residential properties. The proposed exterior soccer field sports flood lighting does not meet the Light and Glare standards of the City and therefore the soccer facility complex cannot be approved.
Community Benefit pg.6
The staff report states that the proposed project will have a community benefit because it’s a recreational facility conveniently located in Bald
win Park.
Response: The part of the Baldwin Park Community that lives on the north side of Baldwin Park disagrees. The benefits of an expensive, me
mber’s only soccer facility complex will not outweigh the negative impacts generated by the from the proposed 25’ tall; 21,299 sqft., oversized soccer facility complex. Impacts such as, increased traffic, noise and light glare in the north part of the City. Any community member who needs to drive through the already congested intersection of Maine Avenue and Arrow Highway will feel the negative impact of increased traffic there. The community members who live on California Avenue, Maine Avenue and Baldwin Avenue will be greatly inconvenienced by the parking-seeking traffic on their narrow, parking- poor streets.
Lot Coverage pg.6
The staff report in this section states that the project is in compliance with the Lot Coverage development standard and doesn’t require a zon
ing variance because what the staff report previously labeled a “parking structure on the first floor with soccer fields on the second floor” (pg2 staff report) is not really a structure at all. Therefore, the definition of Lot Coverage, i.e. “The percentage of the total lot area covered by enclo
sed structures and/or carports, but excluding
27 uncovered steps, driveways, walks, covered patios, terraces and swimmi
ng pools” doesn’t apply, because “the subject project does not propose any new enclosed structures on the first floor.
Response: This statement is incorrect.
As previously discussed, the subject project is indeed proposing a structure on th
e first floor because, as described in the staff report project descriptions previously discussed, the first floor structure will be the “parking structure”. Further, the parking structure is constructed and operates as a “carport’ sheltering the customer’s cars.
In addition, the definition of a structure in BP Municipal Zoning Code 153.220 is: “Structure. Anything constructed or erected, which requires a fixed position on the ground or is attached to a building or other structure having a fixed location on the ground.” Clearly, the proposed 14,518 square foot concrete slab designed to uphold the proposed exte
rior soccer fields construction with supporting concrete pillars and walls, as shown on pg. A-1.3 (sections) is a structure.
Additionally, the staf f report describes “the second floor above the parking
area” as the outdoor soccer fields and the architectural plans, pg. A1.2, identify the “upper floor” as including the outdoor soccer fields and call out that area of the second floor above the parking area as a 14,518 square foot concrete slab, covering both the 14412 &the 1442
4 Joanbridge St properties. By adding the new 14,518 sqft. parking structure area with the 6,625 sqft. floor area of the remaining existing building on 14412 Joanbridge Street, you get a total of 21,143 square feet of lot coverage over a 26,244 square foot lot which equals a lot coverage of 81%. Based on this correct information, the lot coverage is 81%
which does not meet the requirement of BP Municipal Code, which is 50% allowed, as shown in Table 153.050.030 above.
28 Therefore, the project is not in compliance with the Lot Coverage requirement and requires a Zoning Variance to proceed, which has not been included with the project application. Therefore, the project application is incomplete and cannot be approved.
Rear yard setback pg 6: The staff report states: “although BPMC section 153.050.030(A)(2) requires an increased rear yard setback wher
e a commercially or industrially zoned lot shares a property line with a residential zone and a proposed building exceeds one story, the open-air fields above the parking platform do no qualify as a building or structure because they have no roof and do not enclose space.
Therefore, the requirement to double the rear yard setback for a two- story building does not apply.”
Response: Section 153.050.030 (A) (2): Wherever a commercially or industrially zoned lot shares a property line with an exclusively residential or a mixed-use zoned lot, any exterior new structure, or addition to an existing structure, that exceeds one story in height and that faces any rear or side lot line shall be set back twice the required setback.
The argument that the soccer fields are not a structure is not factual.
The definition of a structure in BP Municipal Zoning Code 153.220 is:
“S
tructure. Anything constructed or erected, which requires a fixed position on the ground or is attached to a building or other structure having a fixed location on the ground.” Clearly, the 4 proposed exterior soccer fields and the required 12.5’ tall wire mesh fence, to be erected aroun
d the perimeter of the 14,518 ft square foot parking structure which has a fixed location on the ground, as shown on pg. A-1.3 (sections) is an exterior new structure. On page 2 of the staff report the soccer
field areas are described as “the second floor above the parking
area” as the outdoor soccer fields and the architectural plans, 29 pg. A1.2, identify the “upper floor” as including the outdoor soccer fi
elds and as an exterior new structure.
The archi tectural plans, pg. A1.2, propose a 12.5’ tall, elevated soccer fie
lds, new outdoor sitting areas and new elevator to be erected upon the first story of the parking structure. Therefore, the total 25’ height of the entire new soccer facility structure will include the 12.5’ first story parking structure and the 12.5’ second floor elevated soccer fields, new outdoor sitting areas and new elevator. Since the second floor construction will exceed the height of the single story parking structure, the entire new proposed soccer facility complex will exceed one story in height. Therefore, the proposed new soccer facility complex be required to meet the requirements of BP Municipal Zoning Code Section 153.050.030 (A) (2) requiring the proposed new structure to have twice the required rear setback i.e. a twenty foot (20’) setback.
Thus, the project is not in compliance with the rear yard setback requirement and requires a Zoning Variance to proceed, which has not been included with the project application. Therefore, the project application is incomplete and cannot be approved.
General Plan Consistency pg. 7
The staff report states that the proposed 25’ tall, 21,299 sqft. soccer facility complex is consistent with Land Use Goal 1.0 for balanced deve
lopment.
Response: Negatively impacting the existing residential development by i
nserting a new, non-compatible recreation use adjacent to that existing residential development is not balanced. It only benefits the property owner by increasing the value of his property at the expense of the existing residential property owner. A licensed, experienced and independent land assessor has testified that the approval of the 30 proposed soccer facility complex, abutting the existing homes will devalue the re
sidential properties by approximately 10%. Discussions with the LA County Assessor’s Office also support this claim.(ExhibitX) Therefore, the proposed project is not consistent with w Land Use Goal
1.0 fo
r balanced development
The staff report states that the proposed 25’ tall, 21,299 sqft. soccer facility complex is consistent with Land Use Policy 1.4 to create local and
regional retail and service uses.
Response: Unfortunately, the proposed soccer facility complex will not create local and regional retail and service uses. The project site is curre
ntly being operated as a non-profit business soccer training school use, which does not generate any retail revenue and there has been no indication that the business model will change (Exhibit B) In contrast, the proposed 25’ tall, 21,299 sqft. soccer facility complex is not consi
stent with the City of Baldwin Park General Plan Goal and Policies as follows:
Lan d Use Goal 2.0 – Compatible Development Standards. The proposed size of the new 21,299 square foot soccer facility and the lo
cation of the 25’ tall, elevated outdoor soccer fields, located within 10’ of existing residential properties, is not compatible with existing adjacent single-story, single-family residential development directly abutting the project site nor is it compatible with the mostly single-story industrial development in the surrounding Industrial zone.
Lan d Use Policy 2.5 – Land Use Intensity/Density. The proposed size of the new 21,299 square foot soccer facility and the location of th
e 25’ tall, elevated outdoor soccer fields, located within 10’ of existing residential properties will cause negative impacts on the 31 adjacent residential and industrial properties regarding noise, in
adequate parking, light and glare, privacy, differences in scale and visual incompatibility, as detailed above.
Lan d Use Policy 2.6 – Lighting on Commercial/Industrial Properties.
The proposed size of the new 21,299 square foot soccer facility and the
location of the 25’ tall, elevated outdoor soccer fields, located within 10’ of existing residential properties will cause negative impacts on the adjacent residential properties due to the use of the outdoor soccer sports flood lights for the elevated outdoor soccer fields. The submitted lighting plan (Exhibit E) clearly shows the new soccer
fields will generate the prohibited light spillover.
Land Use Policy 7.4 – Adequate Parking. The design and proposed size of the new 21,299 square foot soccer facility and the location of
the 25’ tall, elevated outdoor soccer fields, covering 22,067 square feet of the 26,244 sqft. lot (84% lot coverage) will not leave enough room for the required number of on-site parking spaces and will not provide adequate on-site parking for customers.
Inadequate parking will cause patrons of the new soccer facility to park on private property on Joanbridge St., where street parking is prohibited, (Exhibit J) and to spill over into the adjacent residential neighborhood streets, where street parking is already severely limited.
Land Use Noise Element NE12 - Based on the applicants submitted Noise Studies (Exhibit D) the proposed project will produce noise levels above the allowed decibels allowed in residential properties.
Findings of Fact - Conditional Use Permit. pg.7
Finding of Fact 1 - Conditionally permitted: The use is conditionally permi
tted within the subject zone and complies with the intent of all applicable provisions of this chapter.
32 The staff report states: “The use is conditionally permitted within the subject zone and complies with the intent of all applicable provisions of Mun
icipal Code. Section 153.050.020 of the Municipal Code conditionally permits recreational facilities (soccer facility) in the I zone with an approval by the City’s Planning Commission. The project complies with the intent of the Industrial zone because it will provide service-oriented uses that serve local residents and businesses, consistent with Section 153.050.010 of the Municipal Code.” Response: Th e proposed project is not in compliance with the City of Baldwin Park Municipal Code Section153.050.010 –Intent and Purpose The project does not comply with the intent of the Industrial zone - Intent an
d Purpose. Per Municipal Code Section 153.050.010 INTENT AND PURPOSE, there are five commercial and industrial zones in Baldwin
Park, established to meet the commerce and service needs of the resident and business communities while ensuring compatibility with adjacent land uses. The zones are designed to accommodate different types and intensities of commercial and industrial deve
lopment. The Industrial zone in particular provides areas for the development of industries engaged in general assembly, manufacturing and processing, and support commercial uses.” The Industrial zone is not compatible with the construction and operation of an indoor /outdoor soccer complex facility as proposed, in that it is not a general assembly, manufacturing and processing, or support for commercial uses.
In addition, this Finding of Fact applies to compliance of the proposed soccer
complex use with the entire City of Baldwin Park Zoning Code Chapter 153, not just section 153.050.020 (Use Regulations). This means that there are requirements in the Zoning Code Chapter that this app
lication for a soccer complex facility is required to meet. 33 However, this particular application does not meet some of these re
quirements and it entirely ignores other requirements. These unaddressed requirements pertain to the Land Uses Standards and Developmental Standards, such as: Parking requirements, Noise Restrictions, Light/glare restriction, Lot coverage restrictions and Setback Requirements.
The project, as proposed, does not comply with the Baldwin Park Mun
icipal Code regarding Parking requirements, Noise Restrictions, Light/glare restriction, Lot coverage restrictions and Setback Requirements.
Parking: The proposed project is not in compliance with the City of Baldwin Park Municipal Code Section
153.1
50.040. Parking, therefore Conditional Use Permit
Finding of Fact 1 cannot be made.
The “Training Sessions” document included in the project application, estimates
that there will be up to 11 people on each of the 4 soccer playing fields, including the full-sized interior soccer field, at any given time, not including one or two players on the 1,643 square foot practice soccer field. This estimate would equal 44 members of the private soccer facility complex, playing and parking at the complex at any given time. In addition, you would need to account for the number of staff and additional members who will be using the proposed gym, the proposed 2 meeting rooms, and the 4 offices. Approximating 2 people in each of those facilities at any given time will generate the need for at least 14 more parking spaces added to the needed 44 off-site member and staff parking spaces needed and the proposed soccer facility complex will require at least 54 parking spaces to be available at any given time to avoid negative parking and traffic impacts on the adjacent industrial businesses or on the adjacent residential use. 34 The staff report erroneously states that ”the required parking for a re
creational facility is one parking space for every employee present at the facility and one additional parking space for every class room” equaling only 13 required parking spaces. The fact is that, per Municipal Code per section 153.150.040, that mistakenly stated requirement is for an elementary or secondary school (private), a use which is not allowed in the Industrial zone.
Actually, the Municipal Code per section 153.150.040, see below, requires 1 space/150 square feet of building area for a commercial recre
ational facility, which is what the proposed project really is.
Therefore, based on the proposed 21,143 square footage of the proposed soccer facility application, the required number of parking spaces is 152 spaces, as shown below
Table 153.150.040 Required Number of Parking Spaces
Number of Required Parking Spaces
Land Use Minimum Number of Spaces Required
Commercial Recreation
d. Health/Fitness Club
e. Billiard / bowling alley
f. Arcade/internet cafe
d. 1 space/150 square feet of building
area (152 spaces required)
e. 3 spaces /100 square feet of building
area
f. 1
space/150 square feet of building
area
School
d. Elementary or secondary (private)
e. High School (private)
f. Specialized and vocational
d. 1 space/employee plus 1 space
classroom (13 spaces required)
e. 1 space/employee, plus 1 space/2
students in 11th and 12th grades
f. 1
space/35 square feet devoted to
instructional services plus 1 space per
classroom (468 spaces required)
The applicant is proposing 39 parking spaces. As previously shown abo
ve, based on the information submitted as part of the applicant’s “Training Session” schedule, when the proposed soccer facility complex is used as only for training sessions, it will generate a need for at least 35 54 parking spaces to be available at any given time to avoid negative parkin
g and traffic impacts on the adjacent industrial businesses and on the adjacent residential use.
Previous facts point to the ability of the applicant/property owner to use the facility for other more intense use,(Exhibit B) as anticipated by the BP Municipal Code section 153.150.040. Since there are no Planning conditions of approval included in the attached PC 23-28 draft Resolution that would preclude the applicant/owner from using the facility for more intensive uses such as 5x5 game play, facility rental for birthday parties and special events or any other use, and there is no Business Operations Plan or Business Plan Narrative document that defines the proposed hours of operation, and there is no separate condition of approval that address the probable more intensive use of the property, there is no reason to believe that the applicant /property owner /business owner will limit the use of the subject commercial soccer facility complex to only training sessions, and will require the full compliment of required parking..
The project is not in compliance with the BP Municipal Zoning Code Parking requirement 153.150.040 therefore Conditional Use Permit Finding of Fact 1 cannot be made.
No ise restrictions: The proposed project is not in
compliance with the City of Baldwin Park Municipal Code Section 153.140.070 (Noise)
The staff report states that that “In order to assess the Project’s noise compatibi
lity with the Project area, a noise survey and measurement were conducted at SOFIVE Soccer Center located at 699 S. Brarranca Avenue, in Covina….This location was selected as a representative noise source because of its urban location and its operational characteristics are similar to the Project. This facility includes ten soccer fields of 36 similar size as proposed by the project. The noise meter was placed near three
fields that were being used…..at approximately 10 feet
from the noise meter,… at approximately 30 feet from the noise meter and approximately 50 feet from the noise meter.” These activities are representative of the proposed conditions at the Project Site and also reflect comparable setback distances from the properties to the south of the Project Site.”
This is the third noise study submitted for this project. The first two noise studies took place at the commercial, ground level LabFive soccer fields in Pacoima and Gardena and clearly showed that the similar number of soccer fields proposed for Joanbridge Street would generate a level of noise that is unacceptable per the Baldwin Park General Plan and Baldwin Park Municipal Zoning Code (Exhibit N Pacoima & Gardena Noise studies ) This is without factoring in the fact that the soccer fields on
Joanbridge Street are proposed to be elevated 12.5 feet above ground level which allows noise to travel further and without natural barriers.
Monitoring Field Report
Location Time Maximum
Recorded Noise
Level (dbA)
Average Recorded
Noise Level (dbA
Lab 5 soccer
complex facility
9740 Telfair Ave
Pacoima CA
6:00 pm (day) 91.8 dbA 60.5 dbA
Lab 5 soccer
complex facility
9740 Telfair Ave
Pacoima CA
7:00 pm (Evening) 78.3 dbA 60.5 dbA
37 SOFIVE Covina
soccer complex
facility
699 S. Barranca,
Covina, CA
5:39 pm (Day) 74.4 dbA 59.1 dbA
SOFIVE Covina
soccer complex
facility
699 S. Barranca,
Covina, CA
8:30 pm (Evening) 64.9 dbA 56.8 dbA
In the third noise SOFIVE Covina study, performed at SOFIVE in Covina (see
Exhibit N for SOFIVE photos), the noise study once again shows that the elevated soccer fields proposed for Joanbridge Street would generate a level of noise that is unacceptable per the Baldwin Park General Plan and Baldwin Park Municipal Zoning Code. (Exhibit N) In th
e SOFIVE Covina noise survey, the noise meter was placed 10’, 30’ and 50’ away from the soccer fields. In the case of the project site, the noise will be generated a mere 10’ from the residential property line and elevated 12.5’ above the ground and therefore the noise that will be received on the residential properties abutting the proposed project will be even louder.
The results of the SOFIVE Covina noise study for this project still show that the noise that will be generated by the five (5) new outdoor soccer fields, elevated on the top floor of a new 25’ tall structure, is still louder than the Baldwin Park General Plan and Baldwin Park Municipal Zoning Code will allow. See comparison table above.
TABLE 153.140.070 (C)
City of Baldwin Park Noise Standards
Zone Time Allowable Noise Level (dbA)
38 Noise Standards
Zone Time Allowable Noise Level (dbA)
Residential 7 a.m. - 7 p.m. (Day) 55
Residential 7 p.m. - 10 p.m. (Evening) 50
Residential 10 p.m. - 7 a.m. (Night) 45
Commercial 7 a.m. - 10 p.m. (Day and evening) 65
Commercial 7 p.m. - 7 a.m. (Night) 55
Industrial Anytime 65
As shown in Table 153.140.070 (C), above, the loudest allowable noise levels to be re
ceived by and recorded in the residential zoned homes and yards on California Avenue, behind the proposed soccer field complex is:
55 dbA decibels during the Day (7 am – 7 pm)
50 dbA decibels during the Evening (7pm – 10 pm)
45 dbA decibels during the Night (10 pm – 7 am).
Noise Comparison
City of Baldwin Park (Sec.
153.140.070) Allowed noise level
SOFIVE Covina Soccer Complex actual
noise level
Residential
7 pm – 6 pm (day ) 55 dBA
1/3/24 5:39 pm (day)
74.4 dBA maximum
59.1 dBA average
Residential
7 pm – 10 pm (evening) 50 dBA
1/3/24 8:30 pm (evening)
64.9 dBA maximum
56.8 dB Average
It should be noted that The Baldwin Park Municipal Code Noise Stan
dards are measured in straight decibels, but with times designations allowing the noise generated to be compatible with the time of day. The SOFIVE Covina noise study for this project provided 39 the maximum (Lmax) and minimum (Lmin) noise generated levels, whi
ch are straight decibel measurements. The Leq noise levels shown in the SOFIVE Covina report is a weighted and averaged noise measurements.
The staff report states “It is noted that the noise meter was placed adjacent to the nearest field and only a chain link fence was between the me
ter and the noise sources. Thus, no substantive noise-attenuating barriers affected the referenced measurements.“ Unfortunately, this is not correct. As you can see from the photos of the SOFIVE Covina photos, Exhibit C - Other Soccer Facilities, the only chain link fencing on the SOFIVE Soccer, Covina site is around the perimeter of the entire facility. All the individual soccer fields themselves have 4’ – 6’ tall padded wood fences around the playing fields, which do act as noise-attenuating barriers. Therefore, the noise measurement presented in the SOFIVE Soccer Covina report already has the noise-attenuating barrier factored in, i.e. the noise generated by the existing soccer facility will be equivalent to the noise generated by the proposed soccer facility with the proposed 2” thick, vinyl removable padding.
The staff report states that “all off-site properties, including the residential uses to the south of the Project site by a 6-foot-highpadded, wou
ld be shielded from soccer activities by a padded wall proposed for the entire perimeter of the second level soccer fields.” Response: Through a discussion with the applicant architect on February 5, 2024, and through research (see exhibit R), Per the attached OS
HA regulatory status data, the “Rockwool” insulation is designed for insulation of industrial piping, roofs and walls. The listed adverse physiochemical hazards are listed as eye, skin and upper respiratory irritation. The attached data also shows that the suggested 40 “Rockwool” insulation is not currently being manufactured into vinyl pad
ding for sports venues.
Per pg. A-1.3 ‘Sections’, of the submitted elevation plans, the 12.5’ tall up
per level of the 25’ tall structure will be wrapped in open metal fencing. The bottom 6’ section of upper-level fences will be lined with removable, 6’ tall vinyl sports fence padding, attached to the open metal fencing with grommets, see Pg. M-1.1 Material Specifications. While any padding may somewhat deflect the noise generated by the proposed elevated soccer fields, the submitted noise measurement from SOFIVE Covina the noise measurement presented in the SOFIVE Soccer Covina report already has the noise-attenuating barrier factored in, i.e. the noise generated by the existing soccer facility will be equivalent to the noise generated by the proposed soccer facility with the proposed 2” thick, vinyl removable padding.
The 6’ top half of the metal-screened soccer fields will have no noise- attenuating material to impede sound from going through the top halves of the open perimeter fencing and into the adjacent residential and industrial properties. In addition, a hypothetical, unproven solution to the existing noise problem is not a mitigation measure.
Resolution PC 23-28 Planning condition (h) “states : that the business shall be subject to the noise limits defined in the Baldwin Park Municipal Code. Music and microphone use shall be used indoors only; whistles and horns are prohibited.” It has been clearly shown that the project cannot meet the noise limits defined in the Code. This condition should be modified to leave only the restriction regarding whistles, horns, microphones and music should be retained.
It has been demonstrated that the predicted noise generation of the proposed soccer facility complex, which has been measured at 74.4 dbA maximum (day), and 64.9 maximum dBA( evening) w ill exceed 41 the allowable level for noise to be received by the existing residential ho
mes, directly south of the soccer fields, which is, per Table 153.140.070.C of the City of Baldwin Park Municipal Zoning Code: 55 dbA during the day and 50 dbA during the evening.
Therefore, the noise generated by the proposed soccer complex facility wil
l exceed the allowable noise levels to be received by a residential property in a residential zone located adjacent to an Industrial zone.
The project is not in compliance with the BP Municipal Zoning Code 153.140.070 (Noise), therefore Conditional Use Permit Finding of Fact 1 cannot be made..
Li ght/Glare: The proposed proje ct is not in compliance with the City of Baldwin Park Municipal Code Section
153.1
40.040.F(Light /Glare)
The staff report states that: “the applicant has provided a photometric pl
an …that is compliant with the Baldwin Park Municipal Code light and glare standards”. Unfortunately, is not true. The applicant has provided a photometric plan which clearly shows the project as gen
erating a maximum light foot candle measurement of 52.7 – 52.2 fc/foot candle units of light, with the maximum foot candle measurement of .1 units of light spilling over to the adjacent properties on all sides. This is reflected in the photometric diagram and in the Statistics table, both found on pg.35 (Photometric study) of the staff rep
ort. According to the Statistics table, on PL1-3 south (the south property line where the Industrial zone subject property abuts the existing residential zone property) there is still a Maximum level of .1 fc of light spilling over the rear property line, even with the increased 10’ rear yard setback.
42 In addition, it should be noted that the 6’ tall fabric padding, proposed to l
ine the lower half of the soccer metal mesh fencing that surrounds the elevated soccer fields, will only cover the bottom half of the see- through metal fencing. The top 6.5” top half of the see-through metal fencing will be open and will not prevent any glare from the outdoor sports flood lighting the see-through.
Further, the submitted photometric lighting plan also shows that the li
ght generated by the proposed flood lights for the interior of the Parking structure will also spill over the rear property line, as shown on the lighting schematic for the ground floor lights. The existing, 6’ concrete masonry wall may deflect the headlights of vehicles, but the flood lights are positioned higher than the wall inside the parking structure and the light from these fixtures will spill over the top of the wall for a generation of .1 foot candles.
BP Municipal Zoning Code Section 153.140.040.F and General Plan Land Use
Policy LU 2.5 both prohibit any light to spill over from the proposed project into the adjacent residential or industrial lots.
Contrary to what is stated in the staff report, the draft Resolution PC 23-28 does not include any condition to require the project applicant to demonstrate that the proposed lighting conditions would not result in excessive spillage. It has already been clearly shown that the proposed project cannot meet the requirements of the BP General Plan or the BP Municipal Code.
The proposed project is not consistent with BP Municipal Zoning Code Sectio
n 153.140.040.F and General Plan Land Use Policy LU 2.5. The applicant’s photometric light survey clearly shows that the proposed elevated exterior soccer field sports lights will shine onto adjacent residential and Industrial properties and will have a negative impact on the adjacent residential properties.
43 The project is not in compliance with the BP Municipal Zoning Code 153.140.040.F (Light/Glare) therefore Conditional Use Permit Finding of Fact 1 cannot be made..
Lo t Coverage: The p roposed project is not in compliance with the City of Baldwin Park Municipal Code Section
150.0
50.030F (Lot Coverage)
The staff report in this section states that the project is in compliance with the Lo
t Coverage development standard and doesn’t require a
zoning variance because what the staff report previously labeled a “parking structure on the first floor with soccer fields on the second floor” (pg2 staff report) is not really a structure at all. Therefore, the definition of Lot Coverage, i.e. “The percentage of the total lot area covered by enclo
sed structures and/or carports, but excluding
uncovered steps, driveways, walks, covered patios, terraces and swimming pools” doesn’t apply, because “the subject project does not propose any new enclosed structures on the first floor. This statement is incorrect.
Response: As previously discussed, The subject project is indeed prop
osing a structure on the first floor because, as described in the staff report project descriptions as quoted above, the first floor structure will be the “parking structure”. Further, the parking structure is constructed and operates as a “carport’ sheltering the customer’s cars. In addition, the definition of a structure in BP Municipal Zoning Code 153.220 is: “Structure. Anything constructed or erected, which requires a fixed position on the ground or is attached to a building or other structure having a fixed location on the ground.” Clearly, the proposed 14,518 square foot concrete slab designed to ho
ld the proposed exterior soccer fields construction with supporting 44 concrete pillars and walls, as shown on pg. A-1.3 (sections) is a structu
re.
Additionally, the staf f report describes “the second floor above the parking
area” as the outdoor soccer fields and the architectural plans, pg. A1.2, identify the “upper floor” as including the outdoor soccer fields and call out that area of the second floor above the parking area as a 14,518 square foot concrete slab, covering both the 14412 &the 1442
4 Joanbridge St properties. By adding the new 14,518 sqft. parking structure area with the 6,625 sqft. floor area of the remaining existing building on 14412 Joanbridge Street, you get a total of 21,143 square feet of lot coverage over a 26,244 square foot lot which equals a lot coverage of 81%. Based on this correct information, the lot coverage is 81%
which does not meet the requirement of BP Municipal Code, which is 50% allowed, as shown in Table 153.050.030 above.
Therefore, the project is not in compliance with the BP Municipal Zoning Code 150.050.030 (Lot Coverage) therefore Conditional Use Permit Finding of Fact 1 cannot be made.
Setb acks: The p roposed project is not in compliance with the City of Baldwin Park Municipal Code Section
153.0
50.030 (Setbacks)
The staff report states: “although BPMC section 153.050.030(A)(2) requires an increased rear yard setback where a commercially or in
dustrially zoned lot shares a property line with a residential zone and a proposed building exceeds one story, the open-air fields above the parking platform do no qualify as a building or structure because they have no roof and do not enclose space. Therefore, the requirement to double the rear yard setback for a two-story building does not apply.” 45 Response: Section 153.050.030 (A) (2): Wherever a commercially or industrially zoned lot shares a property line with an exclusively residential or a mixed-use zoned lot, any exterior new structure, or addition to an existing structure, that exceeds one story in height and that faces any rear or side lot line shall be set back twice the required setback.
The argument that the soccer fields are not a structure is not factual.
The definition of a structure in BP Municipal Zoning Code 153.220 is:
“S
tructure. Anything constructed or erected, which requires a fixed position on the ground or is attached to a building or other structure having a fixed location on the ground.”
Clearly, the 4 proposed exterior soccer fields and the required 12.5’ tall wire m
esh fence, to be erected around the perimeter of the 14,518 ft square foot parking structure which has a fixed location on the ground, as shown on pg. A-1.3 (sections) is an exterior new structure. On page 2 of th
e staff report the soccer field areas are described as “the second floor abo
ve the parking area” as the outdoor soccer fields and the architectural plans, pg. A1.2, identify the “upper floor” as including the outdoor soccer fields and as an exterior new structure.
The archi tectural plans, pg. A1.2, proposed 12.5’ tall, elevated soccer fie
lds, new outdoor sitting areas and new elevator are to be erected upon the first story of the parking structure. Therefore, the total 25’ height of the entire new soccer facility structure will include the 12.5’ first story parking structure and the 12.5’ second floor elevated soccer fields, new outdoor sitting areas and new elevator. Since the second floor construction will exceed the height of the single story parking structure, the entire new proposed soccer facility complex will exceed one story in height. Therefore, the proposed new soccer facility complex be required to meet the requirements of BP Municipal Zoning 46 Code Section 153.050.030 (A) (2) requiring the proposed new structure to have twice the required rear setback i.e. a twenty foot (20’) setback.
The project is not in compliance with the BP Municipal Zoning Code 153.050.030 (Setbacks) therefore Conditional Use Permit Finding of Fact 1 cannot be made.
The Finding of Fact that the proposed use is conditionally permitted within the subject zone and complies with the intent of all applicable provisions of this chapter cannot be met in that this Finding of Fact applies to compliance of the proposed soccer complex use with the entire City of
Baldwin Park Zoning Code Chapter 153, not just section
153.050.020 (Use Regulations). This means that there are re
quirements in the Zoning Code Chapter that this application for a soccer complex facility is required to meet. However, this particular application does not meet some of these requirements and it entirely ignores other requirements. These unaddressed requirements pertain to the Land Uses Standards and Developmental Standards, such as:
Parking requirements, Noise Restrictions, Light/glare restriction, Lot coverage restrictions and Setback Requirements. The proposed project does not comply with the Baldwin Park Municipal Code regarding Parking requirements, Noise Restrictions, Light/glare restriction, Lot coverage restrictions and Setback Requirements.
Finding of Fact 2 - Zone integrity and character: T he use will not impair the integrity and character of the zone in which it is to be located.
The staff report states: “The use will not impair the integrity and characte
r of the zone in which it is to be located. The property is located within the Industrial Zone which allows for uses that provide a broad range of retail, office, and service-oriented commercial uses designed to meet the needs of both the local and residential and 47 business communities. Furthermore, the use will occupy an existing large
building to be retained as part of the operations that is currently vacant and will develop the adjacent parcel as parking on the first floor and soccer fields on the second. Therefore, an indoor/outdoor soccer training facility at the subject location compliments the integrity and character of the zone.
Response: Th e Finding of Fact has not been made that the use will not impair the integrity and character of the zone in which it is to be lo
cated in that, per Municipal Code Section 153.050.010, there are five commercial
and industrial zones in Baldwin Park, established to meet the commerce and service needs of the resident and business communities while ensuring compatibility with adjacent land uses. The zones are designed to accommodate different types and intensities of comme
rcial and industrial development. The Industrial zone, in which the project is proposed to be located, in particular provides areas for the development of industries engaged in general assembly, manufacturing and processing, and support commercial uses. The Industrial zone is not compatible with the construction and operation of an indoor /outdoor soccer complex facility as proposed. The proposed use is not a general assembly, manufacturing or processing use. It also is not a “support commercial use” such as a FedEx Copy Store or Office Depot which would offer a commercial service. For example, customers of the adjacent Tombstone manufacturing and sales will not be dropping to use the “members only” soccer facilities complex. The soccer complex facility would not service the local Industrial businesses, but would be a destination point only for soccer players.
Also, the proposed soccer facility complex use will negatively impact the in
tegrity and character of the industrial zone through increased traffic and inadequate parking, noise, trash generated and light glare. 48 Joanbridge Street is designed to accommodate low amounts of in
dustrial business truck and car traffic and to provide minimal on-site parking for the existing industrial use only. There is no on-street parking allowed on Joanbridge Street and minimal parking is provided for each individual industrial business only. There are “no parking” and “employee only parking” signs posted at almost every business on Joanbridge Street. (Exhibit J) The proposed soccer complex would gen
erate a large influx of cars and people searching for on-site parking and since it is not provided on-site, the demand for on-street parking will overwhelm the very few on-street parking areas, eliminating available parking for the existing Industrial uses and their employees and customers.
The existing industrial businesses will also be subject to increased street trash l
eft by the patrons of the soccer complex (Exhibit C), as well as increased noise and increased traffic generated by the proposed soccer complex.
All of these negative impacts support the fact that that the use will imp
air the integrity and character of the zone in which it is to be located.
Therefore, the Finding of Fact 2: “The use will not impair the integrity and
character of the zone in which it is to be located” has not been and cannot be made.
Finding of Fact 3 - Site Suitability: The subject site is p hysically suitable for the type of land use being proposed.
The staff report states: “The subject site is physically suitable for the type of l
and use being proposed. The on-site circulation plan has been reviewed and approved by the Los Angeles County Fire Department, confirming compliance with safety and accessibility standards. A qualified traffic engineer also analyzed site access and circulation in the 49 Categorical Exemption Report and concluded there would be no si
gnificant traffic impact. The project provides 39 on-site parking spaces - exceeding the minimum required by the Municipal Code – which further supports the site’s suitability for the proposed recreational use..
Response: Th e Finding of Fact cannot be made that the subject site is physically suitable for the type of land use being proposed.
The fact that the on-site circulation plan has been reviewed and app
roved by the Los Angeles County Fire Department confirming compliance with safety and accessibility standards does not make the site suitable for the development of a 21,299 square foot soccer facility complex on a 26,244 square foot lot. The project will consist of a 14,518 squ
are foot concrete slab, covering both the 14412 & the 14424 Joanbridge Street properties, in addition to incorporating the existing 6,625 sqft. footprint of the remaining existing building on 14412 Joanbridge Street. This equals a lot coverage of 81%. The City of Baldwin Park Municipal Zoning Code Section 150.050.030 has determined that 50% lot coverage is suitable for an Industrial site.
Therefore, the oversized soccer facility complex is not physically suitable for the proposed project site.
In addition, the site is too small for the proposed soccer complex to be desi
gned with adequate on-site circulation. The architect has been forced to use only one-way traffic circulation, which is confusing and dangerous. The site is so small that the applicant has resorted to locating the required Fire Department access route and parking area directly in the exit lane. This design will lead to confusion and blocked routes of exit for anyone on the site in the case of an emergency.
Also, the subject site is not physically suitable for the proposed soccer faci
lity complex land use because while the existing Industrial buildings 50 on the subject property were built with a 40- foot and a 50 foot rear yar
d setback to protect the adjacent residential homes from detrimental health and safety risks per Municipal Zoning Code section 153.050.030(A)(2) and Table 153.050.030, the proposed structure will only have a 10
-foot rear yard setback because the subject site is not large enough to build the outsized proposed soccer complex without it.
This zoning code deviation from the required 20-foot minimum illustrates why this proposal is not physically suitable for the subject property.
The proposal to construct the 25-foot-tall, 21,299 d=square foot elev
ated soccer complex facility with 4 outdoor soccer playing fields playing fields on the second floor, to within 10 feet of the homes of Baldwin Park residents, is too big and not physically suitable the site.
Therefore, the Finding of Fact 3: “ The subject site is physically suitable for the type of land use being proposed” has not been and cannot be made.
Finding of Fact 4 - Existing Compatibility: The use is compatible with any land uses presently on the subject property.
The staff report states: “The use is compatible with any land uses prese
ntly on the subject property. The buildings on the subject site are currentl
y vacant. Neighboring uses include a headstone manufacturer, auto body shops, and an aircraft parts manufacturer, most of which operate during weekdays and typical business hours. The proposed recreational facility is anticipated to have peak use on evenings and weekends, minimizing any conflict and ensuring compatibility with these existing industrial operations.”
Response: The Finding of Fact has not been made that the project use, a 5-soccer field soccer facility complex project, with 4 elevated outdoor 51 soccer fields and one inside soccer field, is compatible with any land us
e presently on the subject property. Currently, one of the industrial buildings is being used as a soccer training school, without a City of Baldwin Park business license. The finding did not discuss this land use presently on the subject property. The finding discussed the adjacent property use. In addition, the applicant is proposing to re-use the remaining existing 2-story building in a manner which is incompatible with its originally designed industrial use.
However, regarding the staff report comments that the proposed recreational indoor/outdoor soccer facility complex provides a complimentary service to customers that are visiting the existing Industrial area; a soccer complex facility has nothing to offer the customers of the adjacent tombstone manufacturer /sales business on the west side and nothing in common with the adjacent and existing auto body repair and light manufacturing businesses on the east side.
The proposed soccer complex facility will only negatively affect the surrounding businesses with the increased traffic, noise, light/glare and trash generated by the proposed use.
The intensive use of the 5-soccer field soccer facility complex, as illustrated in the applicant’s submitted “Training Session” schedule, estimates at least 82 people attending the soccer facility complex during 4:00 pm – 10:00 pm, every weekday. This is without even considering how many other customers will be in the gym or meeting rooms. This would generate at least an estimated 84 visitors to the site, all competing for the minimal 39 parking spaces the applicant is proposing to provide. The BP Municipal Zoning Code requires 152 parking spaces.
52 Therefore, the Finding of Fact (4): “The use is compatible with any land us
es presently on the subject property” has not been and cannot be made.
Finding of Fact 5 - Future Compatibility: The use will be compatible with existing and future land uses within the zone and the general area in
which the proposed use is to be located.
The staff report states: “The use will be compatible with existing and fu
ture land uses within the zone and the general area in which the proposed use is to be located. The use of the property as a recreational facility is compatible with existing and future land uses within the Industrial zone and the general area in which the proposed use is to be located. Because the recreational use primarily occurs during non- business hours, it will not generate noise or traffic incompatible with existing or future industrial operations. Future uses with potential impacts typically require approval of a Conditional Use Permit and therefore would be before the Planning Commission for consideration of the cumulative impacts for the area.”
Response; the Finding of Fact has not been made that the use will be compati
ble with existing and future land uses within the zone and the general area in which the proposed use is to be located.
The proposed soccer complex facility use is not compatible with the existi
ng industrial uses in the Industrial zone because of the increased negative noise and parking impacts as previously discussed under Findings of Fact 1.
More importantly, the proposed Commercial Recreation soccer compl
ex is not compatible currently with the existing and future land uses in the general area because the general area encompasses existing adjacent residential homes.
53 The negative impacts of the noise, light/ glare, trash and traffic/parking prob
lems associated with the proposed soccer facility complex will be even more detrimental to the adjacent residential homes. Furthermore, the proposed commer
cial, members-only, soccer complex facility will
never be considered compatible with the residential zone general area, even in the future, based on the fact that a Commercial Recreational Facility soccer complex facility is not allowed in a residential zone without a Conditional Use Permit, per the City of Baldwin Park General Plan and Municipal Zoning Code TABLE 153.040.020, Allowable Resid
ential Uses
Therefore, the Finding of Fact (5): “The use will be compatible with existi
ng and future land uses within the zone and the general area in which the proposed use is to be located has not been made and cannot be made.
Finding of Fact 6 - Utilities and Services. Adequate provisions for water, sewer and public utilities and services are available to ensure that th
e use will not be detrimental to public health and safety.
The staff report states: “Adequate provisions for water, sewer and pu
blic utilities and services are available to ensure that the use will not be detrimental to public health and safety. The existing industrial building provides all utilities and services connected and therefore the proposed recreational facility will not be detrimental to public health and safety.”
Response: The Finding of Fact has not been made that adequate provi
sions for water, sewer and public utilities and services are available to ensure that the use will not be detrimental to public health and safety.
54 The subject property of the proposed soccer complex is bisected by mul
tiple large power lines with transformers as well as other utility lines. These utility structures are located directly where the applicant is proposing to construct the elevated concrete structure as a foundation for the four (4) outdoor, raised soccer complex facility fields.
There are is no discussion in the staff report that the applicant has su
bmitted any plans to the appropriate Utilities or the Baldwin Park Engineering Department regarding the feasible relocation and undergrounding as per Baldwin Park Municipal Code
153.140.050 (B) Underground utilities. “T o protect public safety and improve the appearance of the community, all new development shall be required to install all electrical distribution lines of 16 kilovolts or less, telephone, cable television and similar wires that provide customer services underground.” There are no specific Conditions of Approval
included within Conditional Use Permit Resolution which have been submitted regarding the relocation or required undergrounding of theses existing utilities.
In addition, the public services of the Police Department, Fire Departme
nt and the Code Enforcement Department will be negatively impacted by the operation of the proposed soccer complex facility.
Increased service calls to the Police and Fire and Code Enforcement Departments from the proposed soccer complex would increase the response time of these necessary health and safety services.
There are no specific Conditions of Approval submitted by the Police Departme
nt included within the draft Conditional Use Permit
Resolution because they have not had the opportunity to review and comment on the proposed soccer complex facility. Therefore, these entities have not been able to submit conditions of approval to ensure 55 that the proposed soccer complex will not be detrimental to public health
and safety.
Therefore, the Finding of Fact 6: “Adequate provisions for water, sewer and
public utilities and services are available to ensure that the use will not be detrimental to public health and safety” has not been and cannot be made.
Finding of Fact 7 - Public access. Adequate provisions for public access
are available to serve the use.
The staff report states: “Adequate provisions for public access are avail
able to serve the use. The site has direct vehicular and pedestrian access to Joanbridge Street, which is a local road, but is also proximate to Main Avenue which is designated as an collector street in the City’s General Plan. Additionally, the rolled curb in the public right-of-way provide both pedestrians and persons with disabilities with convenient access to the site and provide access for motor vehicles. The site’s access to streets and highways are adequate in width and pavement type to carry the quantity of traffic generated by the proposes recreational facility.”
Response: The Finding of Fact has not been made that the project would provide adequate public access for the proposed 5 soccer field soccer complex project, with 4 elevated outdoor soccer fields and one inside soccer field.
The proposed soccer complex facility does not meet the requirements of the Baldwin Park Municipal Code 153.150.010 which is to “ensure that all land uses in the city provide adequate off-street parking facilities, loading areas and vehicle movement areas; that the use of land does not adversely interfere with the circulation on public rights- of-way; that private on-site circulation does not pose potential safety 56 issues; and that surrounding uses are insulated from noise and traffic impacts associated with off-street parking and loading activities.” The applicant is proposing to use a single ingress drive aisle and a single exit d
rive aisle, with only one-way traffic circulation, which is confusing and dangerous. The proposed public access ingress and egress are inadequate and dangerously designed, due to the small size of the subject property and due to the fact that the project is proposing to reducing the required twenty-foot (20’) rear yard setback to a ten-foot rear yard setback and the project is proposing to cover 84% of the industrial instead of being below the required 50% lot coverage. This will lead to the over-development of the existing Industrial parcel by the proposed soccer complex facility.
In addition, again due to the small lot size and proposed over- deve
lopment, the applicant is proposing to place the required Fire Department parking lane and access route directly within the exit lane.
This would lead to great confusion and blocked routes of exit for anyone on the site in the case of an emergency.
The application for the proposed 5 soccer field soccer complex project, with 4 elevated outdoor soccer fields and one inside soccer field has not been submitted to the Engineering Department for their review or approval.
The amount of proposed parking spaces does not meet the Baldwin Park Municipal Zoning Code requirements for a Commercial Recreational Use per Table 153.150.040 Required Number of Parking Spaces. The applicant is proposing to provide 39 parking spaces for the proposed new soccer complex, however 152 parking spaces are re
quired per code.
57 Considering the low amount of on-site parking proposed by the app
licant, all soccer complex facility customers seeking parking spaces at the proposed new soccer complex would spill onto Joanbridge St. and the adjacent residential streets of Maine Avenue and California Avenue seeking non-existent street parking, causing traffic blockage on Maine Avenue, on Joanbridge St. and California Avenue, and reducing public access to the residences and reducing public access to the businesses on Maine Avenue.
The additional high traffic volume generated by the proposed soccer compl
ex use would also clog and aggravate the already difficult turn lanes onto Joanbridge St. and California Avenue from Maine Avenue, and the right / left turn lanes from Joanbridge Street, California Avenue and even Baldwin Avenue, onto Maine Avenue.
The residential areas on Maine Avenue, California Avenue and Baldwin Av
enue would be especially negatively impacted. The fact that California Avenue and Baldwin Avenue are dead-end streets would only add to the traffic congestion and confusion as soccer players and spectators and family all try to find off-site parking.
In addition, in their Training Sessions document, the applicant is prop
osing to operate (3) 2-hour classes per day, seven (7) days a week, on each of the 5 soccer fields, accommodating an estimated 74 soccer players and 8 staff members per day. Also, the soccer fields are designed for 5x5 soccer play for a maximum of 10 students/team members on each field with an instructor/referee. That would be an additional 55 people per field when pre-booked When you add on- lookers, family members and those waiting for their time on the field to this amount of possible attendees to the proposed soccer facility complex you could get much more than the amount of people at the facility than calculated by the applicant, all trying to park in the 58 proposed 39 parking spaces. This huge amount of cars/soccer players see
king parking is confusing and dangerous to anyone who would want to park at the soccer complex facility and would reduce public access to the businesses on Joanbridge Street.
The traffic generated by a similar type of soccer complex facility in Co
vina is the SOFIVE commercial soccer complex located at 699 S.
Barranca Avenue, Covina (www.sofivecovina.com) is a clear example of the negative effects a soccer complex will have on existing businesses and
residential areas. Existing businesses and residential next to the SOFIVE commercial soccer complex facility in Covina have resorted to blocking their residential streets and blocking their commercial business parking lot entrances with “no SOFIVE soccer parking” in order to preserve their own residential and commercial parking spaces.
Complaints to the Covina Police and Code enforcement have increased at this Covina location.
Therefore, the Finding of Fact (7): “Adequate provisions for public acce
ss are available to serve the use” has not been and cannot be made.
Finding of Fact 8 - General Plan Consistency. The use is consistent with the General Plan.
The staff report states: “The use is consistent with the General Plan.
Lan
d Use Goal1.0 Balanced Development in Baldwin Park. Maintain a balanced mix and distribution of land uses throughout Baldwin Park.
Land Use Policy 1.4 Create opportunities for two different levels of commercial development: (1) commercial uses that meet the retail and service needs of the local residents and employee populations, and (2) 59 regional-serving retail commercial businesses that capture revenues from a b
roader population base.”
Response: The staff report states that the proposed 25’ tall, 21,299 sqft. so
ccer facility complex is consistent with Land Use Goal 1.0 for balanced development. Negatively impacting the existing residential development by inserting a new, non-compatible recreation use adjacent to that existing residential development is not balanced. It only benefits the property owner by increasing the value of his property at the expense of the existing residential property owner. A licensed, experienced and independent land assessor has testified that the approval of the proposed soccer facility complex, abutting the existing homes will devalue the residential properties by approximately 10%.
Discussions with the LA County Assessor’s Office also support this claim.(Exhibit H) Therefore, the proposed project is not consistent with Land Use Goal 1.0 for balanced development
The staff report states that the proposed 25’ tall, 21,299 sqft. soccer facili
ty complex is consistent with Land Use Policy 1.4 to create local and regional retail and service uses. Unfortunately, the proposed soccer facility complex will not create local and regional retail and service uses. The project site is currently being operated as a non- profit business soccer training school which does not generate any retail revenue and there has been no indication that the business model will change.
In contrast, the proposed 25’ tall, 21,299 sqft. soccer facility complex is not consi
stent with the City of Baldwin Park General Plan Goal and Policies as follows:
Land Use Goal 2.0 – Compatible Development Standards. The proposed si
ze of the new 21,299 square foot soccer facility and the location of the 25’ tall, elevated outdoor soccer fields, located within 10’ of existing 60 residential properties, is not compatible with existing adjacent single- story,
single-family residential development directly abutting the project site nor is it compatible with the mostly single-story industrial development
Land Use Policy 2.5 – Land Use Intensity/Density. The proposed size of the
new 21,299 square foot soccer facility and the location of the 25’ tall, elevated outdoor soccer fields, located within 10’ of existing residential properties will cause negative impacts on the adjacent residential and industrial properties regarding noise, inadequate parking, light and glare, privacy, differences in scale and visual incompatibility, as detailed above.
Land Use Policy 2.6 – Lighting on Commercial/Industrial Properties. The prop
osed size of the new 21,299 square foot soccer facility and the location of the 25’ tall, elevated outdoor soccer fields, located within 10’ of existing residential properties will cause negative impacts on the adjacent residential properties due to the use of the outdoor soccer sports flood lights for the elevated outdoor soccer fields. The submitted lighting plan (Exhibit E) clearly shows the new soccer fields will generate the prohibited light spillover.
Land Use Policy 7.4 – Adequate Parking. The design and proposed size of the new 21,299 square foot soccer facility and the location of the 25’ tall, elevated outdoor soccer fields, covering 22,067 square feet of the 26,244 sqft. lot (84% lot coverage) will not leave enough room for the required number of on-site parking spaces and will not provide adequate on-site parking for customers. Inadequate parking will cause patrons of the new soccer facility to park on private property on Joanbridge St., where street parking is prohibited, and to spill over into the adjacent residential neighborhood streets, where street parking is already severely limited.
61 Land Use Noise Element NE12 - Based on the applicants submitted Noise Stu
dies (Exhibit D) the proposed project will produce noise levels above the allowed decibels allowed in residential properties.
Therefore, the Finding of Fact 8: “The use is consistent with the General Plan
have not been and cannot be made.
Finding of Fact 9 – Safety and Welfare. The use will not be detrimental to the public interest, health, safety, convenience or welfare.
The staff report states: “The use will not be detrimental to the public inte
rest, health, safety convenience or welfare in that the recreational facility (indoor/outdoor soccer field) will be developed in accordance with all the development standards of the zone and will operate in substantial conformance to all conditions of approval as identified in the resolution of approval. The active recreational use promotes healthy lifestyles for the City’s youth, which is support of their general welfare.”
Response: The Finding of Fact cannot be made that the use will not be detrime
ntal to the public interest, health, safety, convenience or welfare.
The proposed soccer facility as presented will not to meet all of the development standards of the zone nor will it meet all of the op
erational standards of the zone, as shown in the table below. Th e Development Standard for the rear yard setback is a 20-foot setback; the applicant wants to build a 10-foot setback. Th e Development Standard is for a 50% maximum lot coverage; the applicant wants to cover 84% of the lot with the proposed development.
Th e amount of parking required by the Development Standards is 152 parking spaces; the applicant is proposing 39 parking spaces. 62 Th ere is no on-street parking available on Joanbridge Street. Any area between the rolled curb on Joanbridge Street and the existing industrial buildings belong to the individual properties and are not available for public parking.
The proposed soccer facility as presented will not to meet all of the Operational Development Standards of the zone:
Th e Operational Standard for allowed any Noise in a residential zone is that it must be measured in dBA at the property line of the receptor property and wh ere a boundary or wall exists, the measurement shall be made on the receptor property. In this case, the receptor properties are those residential properties located directly south of the proposed project site’s rear property line. The allowed decibel amount for a residential zone is 55 dBA day and
50 dBA evening; the proposed soccer complex project
would produce 91.8 dBA day and 78.3 dBA evening.
Th e proposed soccer complex facility does not meet the requirements of the Baldwin Park Municipal Code 153.150.010 which are to provide adequate off-street parking facilities, loading areas and vehicle movement areas; that the use of land does not adversely interfere with the circulation on public rights-of-way.
BP Required Development
Standard
Proposed Soccer Complex
Setbacks 20 ft. rear yard Proposed Setback 10 ft. rear yard Lot coverage allowed 50% Proposed Lot coverage 84% Parking required 152 parking
spaces
Proposed Parking Spaces 39
No Street Parking available Increased Street Parking not addressed
BP Required Operational
Standards
63 Noise 55 dBA (day)
50 dBA (evening)
74.4 dBA (evening)
64.9 dBA (evening)
Traffic Increased Traffic not addressed
Light and Glare none allowed Photometric study shows +.1fc spillover into adjacent properties
Fire/Paramedic Services Increased Fire/Paramedic Calls
not addressed
Police Services Increased Police Calls not
addressed
In addition, the staff report states in the finding of facts above, the re
creational facility (indoor /outdoor soccer field) will operate in substantial conformance to all conditions of approval as identified in the resolution of approval. However, regarding the Conditions of Approval, Conditions of Approval PC 23-28 is woefully incomplete.
There are multiple instances illustrated the previous report sections, where the staff report has said that a specific condition of approval is in the conditions of approval, but the condition was left out.
Further, if the proposal will “operate in substantial conformance to all conditi
ons of approval as identified in the resolution of approval”, as stated in the staff report above, then because of the ambiguous and minimal number of Conditions of Approval in Resolution PC 23-28 the finding cannot be made that the use will not be detrimental to the public interest, health, safety, convenience or welfare.
Exhibit A
Petition and letters against the project
Heltro,
My narne is .Toana Fang, and tr grew up otl Califomia Ave, in Baldwin Park. I am writing to yori to strongly oppose the addition of the soccer complex being proposed for 14412 & 14424 Joanbridge Street in tsaldwin Fark. This proposed complex'wouid be right next to my childhood home.
This neighborhood is not the right place for this complex. We are sun-ounded by the one-lane street of Maine Ave, which is not set up to handle the traffic influx that this place will bring.
Further, rnany people unfainiliar with the area get lost here. Potential customers wouid frequentiy get trost and tum onto California Ave (not a through street), causing a disfurbance to our neighborhood.
In adclition to traffic, parking will be a major issue. The proposed parking structure is not enough, and thus, customers would park onto sunounding streets, including ours, which are typically already full on a day-to-day basis. By allowing this business to build here, yori will be preventing community members from parkingnear their homes. We will have no place to park.
Furtheq when looking at the other locations of Lab Five, I see that their hours are 8am-midnight &!_ipq;liqlv*!!_Ab-j$v,e.qqtE,iE-q_ntaq!1) . Further, they have the option for clients to schedule events outside of these hours. This means that there is a 2417 period of noise. That is not okay. Soccer tournaments, games, and events are inlerently loud and should not be built within neighborhoods, such as ours.
Community members have dogs, children, and adults who are sensitive to noise. This will disrupt their living. The large sporting lights that will be built upon a roof will glare into our homes, once again 2417 . Thris will also deprive us of our privacy as event-goers can see into our homes. This is not okay. Once again, I skongly oppose this project because it wiltr tremendously negatively affect communify members of Baldwin Park. Please think about the residents that have lived here for decades, and reject this proposal. Thank you for your time.
Sincerely,
Joana Fang
December 13,2023
12/3,2/2023
We have supplied you a drawing of a side view of the pnoposed soecen field and the exisfing honne dlreetly behimd the ffeld at 3.44i-g California.
This drawing shows the signifieant height diffenenee of the two pnoperfies and amplifies the effeets of light pollution into the California stneet properties. This light pollulfion is nrot aceeptable and should never be allowed by the planning commission" The developer does not indicate where on how high the light poles will be, but it is assumed that they wiNl be 2CI to 25 feet above the playing surnfaee so the players wilX not have light directly in their eyes.
Noise pollution from ongoing garnes will disnupt the wel! being of the nesidents adjaeent to the proposed ffelds as well as linniting those residents use of their own back yands due to light and noise pollultion fronn this facillty"
Acconding to the Centers for Disease Control and Prevention, L7 percent of adults have perrnanent damage to their hearing due to nolse.
Any sound above 85 dB can cause hearing loss, and the loss is related both to the power of the sound as well as the length of exposure. you know you are listening to an 85-dB sound if you have to raise your voice to be heard by somebody else.
ln the applicants own noise monitoring field report, noise tevels of 91.8 db were recorded in Pacoima between 6;10 and 6:25 PM. On 1,/ZS/ZOZ3.
Residents should not have to accept what planning is proposing.
How would you like to have this in your back yard?
lf you can honestly say that you wouldn't mind this in your back yard, go ahead and vote for it...if not then turn this project down"..this is not the place for it.
ilr^,Aaee
-ts.(t-$$
Gfr
pffi
f
Trrf,15
,d
/
f
^g
V
1I$..!{s **ii#|,,,
i4islllV
liar+r**t:{
1X**i3* Ki\r*t li$,Hrni*{
t t$.*ti0 Ar4rl$ S{irdir*q
liln*tr8 tt*in *aw
9fr=I&0 FarYBr 1$,$rl
tg*St S!4y r4+q${rptd
?S-8& f,ily:itr**t
?$-?E lrltld r,.&*i6
5{i *Sg !'I$ri:}nt (r}r1!*${ti&li
tl r*
ij 6, ruu,^d
r {tt1
& 9t 9 "^t:
Gr, . \o yt r rJ\
r00 dsi't,
:::
9$ ds
8e d8
6Sdt ""
3S d8
: r: _,.::: . , {$-t! et}iet *fiit$
4ft dB :: -- ':':.:::
r::::.1 ::ti:i I, i::r,. i
:r:r,1.:).r,::::'i 3{*lt6 &n*! bqrdld}Q*n
S**er1l.=llji::::!::i;:::
li:i':'r':::ii
ri:n ::.:lltjir :
a:ili::'iJji:
?BdE,:ri,i;
::::':;t::t'i:N
-l '' ..: ,
1..'..,Ii'..:.i:l-
1s d8;-i.r-:
i l, i:,IE-r-:sl{,i{
tqw,4; itJ
la+e;fi
O dBltffil 0 lhrethotd ol hearmg
,4*.{f& [.]pp*r t*ireri"r*1d of gr*:.ir"r
Nffig!
I DO NCIT WANT A i.I[,'GE 2 STCRY SOCCER COMPTEX
IN MY NEIGHBORHOOD
L44LV &14424 Joanbridge St", Baldwin Park
OPERATING HOURS: 4 PM - PAST L0 PM EVtrRYDAY CIF THf
WEEK
8 AM _ PAST 6 PM SATURDAY
8 AM * PAST 2 PM SUNDAYS
CAUSIruG INCREASED
. NOISE
TRAFFIC
I.{UGE LIGI{TS ON THE SECOND FLOOR
TRASH
IN MY NEIGHBORHCIOD
Na rne Address
"/;tir, L*,, ?{ o
it*+{ | L*.1'Jr;lrL: c1 Av'(.
)
I': f r.ri: \ . (n f,r vl.rn ?
i.t,1 I t, L$ \' \cr ni *., P'u:<-
-I'{.r;i.\'.ir , vr -?->r.v [1 r' h rlltrr.r {-
y$I_>\^l extz t*t$,S\xPH'n *E,.u,o
NO!!
I DO NOT WANT A HUGE 2 STORY SOCCER COMPLEX
IN MY NEIGHBORHOOD
1,4412 &1.4424 Joanbridge St., Baldwin Park
OPERATING HOURS: 4 PM - PAST 10 PM EVERYDAY OF THE
WEEK
8 AM _ PAST 6 PM SATURDAY
8 AM - PAST 2 PM SUNDAYS
CAUSING INCREASED
NOISE
TRAFFIC
HUGE LTGHTS ON THE SECONp ftAOR
TRASH
IN MY NEIGHBORHOOD
n ^ Name Add ress
{//bW lW / fAaqh44.a/ Aa/"^-
Exhibit B
Futbl Game Changer in Baldwin Park
California
EIN 8S3619345 - Futbl Game Changer, Baldvvin PE*' Calif( 1,5:36 PM
w#
Futbl Game Changer in Baldwin Park, California
Home (//eintaxid.com/) ;, Companies with'P (//eintaxid.com/companles/f/) t FutblGame Changer Organizafon Bofile
.-,0' nr*. -;;;r*;t", *-*.--*0, "*r-,rrtion ,*rr*i
in Balrdwin Park, California. The Employer ldentification Number (ElN) for Futh'lGame Changer is 8536193{5' EIN
is also referred to as FEIN (Federal Employer ldentification Number) or FTIN (FederalTax ldentification Number).
The organization type for Futbl Game Changer is
CSmggfigg and its contribution deductibility status is
Contrrihutions arB dedyctihle. FutblGame Changer is
exempted by IHS under the category of charitable
Organization. The organization is an independent
organization or an independant auxiliary. The latest return for the tax period was filed in December,l0?Z.
Basic Profile
FutblGame Changer
85-361 9345
Orparization Name
Hil $axpayer Id)
GorSeCt Addrepp:
Address Lins
city
$tete
zip
1M24 Joanbridge St
Baldwin Park
California
9170e1746
Tar EXem
683 a ffi@
arlaaa!tl I
Posts
fiIIfifiHil
FUTBL GameChangers
37 followens . 0 following
$ ruessage P rollow Q. Search
About Mentions Reviews Reels Photos More v
lntro
Mentoring youth female soccer athletes to hecome confident and skillful. Head Coach Sheima Berenji
@ Page' Nonprofit organization
Baldwin Park, CA, United States, California
I [email protected]
futblgamechanger.crg
Not vet rated (0 g*uis\ils1 W
&
ffi
-*.
ffi
HffirtEI
$OEEER
Our Development
Our Sessions Our Clinics
Our Consults FGC Progrom
Our Lob Our Steff
Our Testimoniols
*t*trN th* W*!t{ist
THE TGC IAB
$occer Performonce fcciliry
equipped with highest quolity equipment to drive
the success of eqch othlete.
Fnf[ttEc
SOEEEH
ffi
Our Development
Our Sessions Our Clinics
Our Consults FGC Progrom
Our Lob Our Stqff
Our Testimoniols
".'0lN the kVcltlist
r,1
ti
Shooting Clinic
Concellotion Policy: No Refundr for concellotions mode ofter the 48 hour requiremett Molreup ot discretion of Cosch.
Low ottendonce clinics moy be rescheduled or concelled.
FUTBTTEE
SOEEEH
Our Development
Our Sessions Our Clinics
Our Consults FGC Progrom
Our Lob Our Stoff
Our Testimoniols
lnterested in renting the focility?
Send us o message snd we will be touch with pricing ond ovoilobility.
NOme {required)
First Nome
.
i
1|i--".--. "-*---* **.*
Em0il (required)
Last Nome
,-.-*_-'*.,_
I
I
i
t
I
!
t
FUTEtKEE
$OEEEB
hiday, Mare[ 28th, 2025
I:00 PM
. C0HBlIl0illll8/SIRtt{GIH AilD fHISHI}{G Cllllrc nith Shdma : Berenii
, t hour 15 minutes @ $60.00
.
, This clinir style session will include circuit rotatisn for mnditioning and , fitness exercises for the first and tonslude with finithing exercises. .
, Age: Born 2011 and older
, Leuel: lntermediate/Aduanced
i
cHtct( coDE BAtAllcE
Powered by
Our Development
Our Sessions Our Clinics
Our Consults FGC Progrom ,.:{iir'* tf':+r ",,r'fr:ititr*t Our Lob Our Stoff
0ur Testimoniols
I{EXI SEEI(
a
:
1': r* iS aJ I
+i_! iii,i"i
:
3 spots left l
Nrsc rrmss )
acuity ! scheduling
Exhibit C
Other Soccer Facilities
e
\
\
(}
l-i5
\
\L
c
\n
:*; it. r
i,;1:.
iE'
,l
UD
\
\
\
$
II
E
i
S 0rffe Co*na
. .{a..:,..:'......:.:t. :
. :.5,;::,.:,.1.1,.:,,, . ]i"hrSr'N"'si
-sS'
;,:,trir.,.:r..rri:r:.,:r{r\,
':.,''. a.trt',:.:it.:,.,'..'. t{}. .t :tt;t::..::,.r;ir_r.:t r \jY.. :.::.::.:1:t-:,: ::-:i:!t . \, '
"':t)
'':"":: "' I=. : :. ::, ':.. :: :a': .L)
:\5
RJ+
' ,;;;,.;,,r, 'q
-)\l(.: : ,. a:: .,: a )>...: .,...,,t..:....: ..,......... \: .:. .\\ \lxvtoF
. . . .:; ..,: . .,.. ,., .., \,
!,,
$s-
*.l*-:
Qr\di
i
$).</
r)u
A-:
\-,
--rBr
d\S
'-(
aU,e?
NP
B
'=!1S
,:t-E
*,
a+.
taz.
r_19:
.:f,..
€'+#:.
_:ffi|-w
-.__=
. .!.-.'
),;\& :
fi
'-F--|
)*"t
\.i
J
r*-J
**r*
.d.:5
"..:
;"
(-,1
(.\
J/*s::\i .-.i*-
r
\
\:
.,.€
',;*rN*$
s
-$
N
.,::,];€',
'+ a a ::a-
i.'
t ;i+.r=-3 .-"'' - r. :
;4.
i
:
:* .,
{
I
..\-
{-"i.
-J\-
r\*.4
**),1,,.
-,X J*"!!-) :. :: t
;'al !*
lil-/ -..'r
1r,.1, l-'
i:'{, *+-
1.r +..-
'-".--i u
-,
/\r{/fit/lr! trrl5 wfil "w
^wwwn g qwl
.-.i.,1
.i.
i$:=1i:93?+a'
Exhibit D Noise Studies
lrd
erk*7
I,;!
l,
ilIOISE MONITONING IIELD REPORT
Site Map
Proiect ilama: Fit 7 Sports Lab Development Project
"g;trf{tx,# u- "*'c' t1 &o,
Date:;lrtLq Site Number: e
Measured By: Annalie Sarrieddine
MeasurementStartTime: f, Ba 1,.,
Measurement €nd Time: t, q s- e n'
Total Measurernent Time: 15 mln.
Noise Meter Model: Larson Davis Soundtrack LxT Calibration: 94.0 {dBA} Meter Settin8: A-Weighted Sound Level (StOw)
Session File Name: L *b r?^*x. R rt s
Primary Noise Sources, lr/r*nto et;j ara,/r<, ,/ /l* *t
1. 2.
3. 4.
5. Other Noise Sources During Monitoring
Time:
IMPACT re
Data Summary
Noise
Scale
Noise level
{dBAI
L.c {zt
L.r* 61-?
Lrxn ?e. z
Time:
Time:
Time:
fime:
Additional Note$;
/tl
SCIE}ICES
,'}
LUt *'
{"
@ ff*e*e: I.d ? 5p6r1s L*b *srereq**rrlt Project
HSfSg [,t0illT0RlilG fIELD REPORT
1. 2.
3. 4.
5. t \'',
$ileMap
t:t
Tirne:
Time:
Time:
IJZ tr< z t, *t --1
Time:
Time:
rtc//
lf'lPACf
'71,/t,n*t.L A'. /'/ /rrel 6 7/VQr-s
dfr-, 4/;rrt ''^'44'{14/ iL-,:, rca*L^7 ,at *il&
{r-u^*j }.
'c1-J
t/L,r* (ilr,ll, ffut,, lr,^7 ff,&*
0"
7 r, a7 f*a tsoel<-S
i",.la::r -.€ Ls.a: cn: !-^r"_i. I*.._< 3;t'5
;z;;C;L-,s ctA'*1'< =*'t' F*
5*t* il*ex*$*r: /i?. =-+ I l-.f
$6em,st* fu **r*rd* Sarmedd{+l*
. &i*see'mrst S,qprt Tilme: ti i 1 5k,
, x*smslerqt{*dy*rlt*: {, {q f*. *
r+qa ildexs**#'slent Tiine: 15 rnin.
W*$* as*trs *itdei: La.son Oavis Soundtrack !x? Calibraticn:94.0 {dBA} &ffi*r Srttirry: *-l{eigbted Sound Level {SLOW}
5***mnfxk H*ne: 4*, A *A^.Za€ 5
*nm**?l*ai:escurcer,
lur, , *e-n, lt h'-/*, ft*., l*ourr.. , , da<c-{
; &b summary Otherf{olse Sstffeg Oudng Monitortng
f*si5e
!c*f*
Noise Level
{dsA,
L.c f?. t
L* V't. v
L*t" s*+. 7
AdditionalNoks:
$cttilcts r/4- i-r;u t*4e:
NOISI MONITORING FIELD REPORT
Project Name: Fit 7 Sports Lab Developrnent Projeet
Monitoring Location: Soo"-. C-. \,t-a
J
Date: I lzs-lzrzl Site Number: 3 (^,1r'V)
Measured By: Annalie Sarrieddine
Measurement Start Time; ?: o o J511
Measurement End Time: ?l f f ? n
Total Measurement Time: 15 min.
Noise Meter Medeh Larson DavisSoundtrack LxT
Meter Setting: A-Weighted Sound Level {StolAr}
Session,FileName: L*+ - D-X*- ?ol
Calibration: 94.0 {dBA}
Data Surntnary
Noise
Scale
Noise Level
(dBA)
L.q (o. s-
L," 'rb.q
Additionat
HT'5:
Site Map (Lab Five Soccer Facility - Pacoima)
PrimaryNoisesources: 7*h^, L. I d"1,,^h, ft"tt.,, ?*.1r* &.r-"ip Other Noise Soufces During Monitoring
1.-fl, -€L^-- rimet-V:o qt
rime:-3: Q *
Time:{g
4. 5.
lime:
Time:
l, *fir, ? /r?
IMPACTT
sclEltcEs
NOISE MONITORING FIELD REPORT
Project Name: Fit 7 Sports Lab Development Project
S'o"<-t Tl.l f: t1
Site Number: 3 ( o.1n ^)
Measured By: Annalie Sarrieddine
Measurement Start Time: L' .' t a ? t'1
Measurement End rime: 6 : t s' fr'l
Total MeasurementTime: 15 min.
Noise Meter Model; Larson Davis Soundtrack LxT
Meter Setting: A-Weighted Sound Level {SLOW}
Session File Name: Lx F - D*L ?oP
Primary Noise Sources , fo, k; ^ n l" l- Ae /';r. /',1
')t
Calibration: 94.0 (dBA)
Monitoring Location:
Date: I lzf I zoz 3
Data Summary
; Noise i Noise Leveli1
I Scale : {dBA}
Site Map (Lab Five Soccer Facility - Pacoima)
, G, f-L",,-s, il,s;", Sor.., C''
/.1:": v.J'
Other Noise Sources During Monitoring
f : r{
Time:
Time:
Time;
Time:
\/t
1. {:*' /./o ^ R;^ "i Time:
--2.
3. A
5. Additional Notes:
(7^n .5 t./ L/ 1- o. lr r- /n l*ar.*',^.r De o D 1,2 a[.'^rl ni:--J--f,-t.Tl- Qr.
IMPACT
SCIENCES
NOISE MONITORING FIELD REPORT
Project Name: Fit 7 Sports Lab Development Project
9'oc.--r Tl.l t t1
Site Number: 3 ( o.1r, ^)
Measured By: Annalie Sarrieddine
MeasurementStartTime: 6.' t a 7 4
Measurement End rime: 6 : t s' fA
Total Measurement Time: 15 min.
Noise Meter Model: Larson Davis Soundtrack LxT
Meter Setting: A-Weighted Sound Level {SLOW)
Session File Name: Lx b - D*L 2o&
Primary Noise Sources , f^, k; ^, l" k fre /;r. /_7
')d
Calibration: 94.0 (dBA)
Monitoring Location:
Date: I lzf / zoz 3
Data Summary
i Noise i Noise Level
, Scale (dBA)
I
L"o i G q.L
Site Map (Lab Five Soccer Facility - Pacoima)
, G, /}"'ns, il";", So"u' C*
/"t-:"i l1 ,
Other Noise Sources During Monitoring
e: tS-
Time:
Time:
Time:
Time:
\/
1. d*' /4oak;^1 Time:
-
2. 3.
4. 5.
Additional Notes;^""
--:-
*Gan <s tt o,c
"oJ,!:J-L*p^*t1\ --p"
o p ta c\,^r:1 ,
--t-+l--(/JJ
IMPACT
SCIENCES
...
Designer
Date
01/08/2024
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min
_
SOCCER 1-3 22 .8 fc 52.7 fc 12.3 fc 4.3:1 1.9:1
_SOCCER 4 23.7 fc 52.2 fc 5.1 fc 10.2:1 4.6:1
PL1-3 EAST 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL1-3 SOUTH 0.0 fc 0.1 fc 0.0 fc N/A N/A
PL1-3 WEST 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL4 NORTH 0.0 fc 0.1 fc 0.0 fc N/A N/A
PL4 WEST 0.0 fc 0.1 fc 0.0 fc N/A N/A
Current View
...
Designer
Date
01/08/2024
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Current View
...
Designer
Date
01/08/2024
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Current View
Statistics
Description Symbol Avg Max Min Max/Min Avg/Min
_S
OCCER 1-3 21.8 fc 43.1 fc 10.9 fc 4.0:1 2.0:1
_S
OCCER 4 21.5 fc 44.7 fc 5.8 fc 7.7:1 3.7:1
PL1-3 EAST 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL1-3 SOUTH 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL1-3 WEST 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL4 NORTH 0.1 fc 0.1 fc 0.0 fc N/A N/A
PL4 WEST 0.0 fc 0.1 fc 0.0 fc N/A N/A
...
Designer
Date
01/08/2024
Scale
Not to Scale
Drawing No.
Summary
1 of 1
Current View
Exhibit hi
Usnlforffi? Residential Appraisal Report
California Avenue
Baldurin Fark, CA
Uniform Residential Appraisal Report
qu,r.ifiU.fqolof c.g3 4 3 or iz
File# 06010'1
,ralues have recently showF relgtlve sjabilily.
The intenoed user ol lhis-appraisal report is the Lender/Clienr. The jn,tended use's-ro evaluale the prQperty ine1ls rhe suolecr of tfli apprCi-s?Ll-of asjliglIfient. Appraiser has not pedsraned any serr'ices fcr ths subieci Drooertv in the 3 vears immediaielv o.ecedina aecADtanee of ih;s or.j-or Land value is over 307; of ihe toiai prooertv value, this is tvoicai throuohout the area- Land val{re is the trrocr the city.
I4LcompglaUlg-A-eafSh}4tyS€eI9h-pAGrnelelltrygre limited to-L5 mile radius. and GLA differetq_es SI !p t! XOQ_j. AlSIat_91_1_Q qqr!.o_!.__. -_- U/elelAleide&d'Ihj9 llag narJowClLdqql iq the lixtthat urere used in the aporaisal. These were considered the most raliabls closed ncnaJino and listi.Ia__seler.,Ii1qy_le$lgleE lle subject's true m_arket vatue.
All uliliiies maior systems checked an-d in working order Suhic.J is nwncr ^ccrrfiipd NQTE-I& s-!j-Sje,_cj's IqryelnS 11m_e_-19 le!ryeg! Jq-10_ dqys based on vaiue at the time of appraisat.
Exposure time is estimated to be 50 daVS, _
NaIESnptC leESlors_!qgtgqq-c3lqqqmomxjqgllarmsin_place. Water heater srrapped. _.. .. 3)fulcnc]qlyleqgjue.4)t\4qX1Eqly_ plodgqtlY q,- . _,,,__ NarE_AS_pqLU.SFAP app_taqel.q-o._rypllanqqJlt!_ig i[qBplagal r.e-port.
This aoDraisal was oreoared in accordance with the oi i;tl6 Xl of +he Finen.;el Insti+, 1989, as amendecj (12 U.S.C. 331 et seq) and anv impiemenlinq fCS!lq1b[S_ _The corona virus threat mav be imoactinO markqi c-onditions. i-lowever in most. markets it is noi y-a_t clear to what exient, it any, market conditions__ - arg-gffelte!- Egmplrsqtus faqaEingiu4e rllcluqlsltan-ernplsvre$ cN c-bensecrilnrqe{raies. Madigl llelyqls_utllgdes observins market . . . reactions which this analvsis beq.SQeglnQle gonEp!&ated when market participants themselves are facing uncertainfr'.
The subiect was noi ha-!]!ed b.y lgqlEgAtodfn a-SoCqty_!he!]!?q jeqslgted qfedeEl di!q,sie!"arca.
Seller concessions are typical are minimal, no ad,uslment warranted. l$pTE lApSErse! 1he rCbig-c.t plqgrtv-on 06/03/2023 for $608.0!0liri5 epprarsal included.a location ad!usiment that reflqStedlbejlqe_St___ backinq to an inciuslrial cjeveioBment, Q!1lle.n{y-lhele-E ! pIapS:eC SSlcel aqEylqeplqqelGjlqClIq giSpl!94&pfol]!!glftSiq!9!2 _ levels of constructiol-@vm, bqlhqsr!,Ellqgh€lll qq!-qA!d gglralkrns stalls. Atso there will be ftood iishts and sqcgqlEqtllt9t1lS.,PrSpqtqq_ilqqls,St lqC alglpm io 1Opm weekday!;_gCm&€pqlatqdey jlOlemlSzpm Sundav. Thig,plgposal _ . eliSy[lgqt-Sl tb9-9lble!1llqLejy]ltuch l€ss iolerable. Also addqd noise and traffic ciue to SLq[qe in use witt affect th -,,exact dollar amount is not caicuabie without much more inienle scrutinv. This p{gpggqly.di at'ect the subie liqht pol,utieli, traff,c p_g!Uig!,r! w9U is,!rySt1.I]ole trash and debris. D glee!]nS lE$Eql.lyJhe subiect,s value will be€ffected ftggativelv, This is all bas-ed on the exkaordinary assumplrp.r:jiallie:Er{qpro_vjllerE Elq lqmpieied in ihe manner proposecj_ CoST APPR0AcH m VALUE (mi le{ukqd bT Fanrie Mae)
Fovide aoiorate oomat,o' lo r rqe ?noclerient r o r pp i"ali ne Ueio* cos, iqL rrs ,",t "i e I din4s - contrib{toryvaluqo-fllmitartglsintf*aiea.as-aponnnpltrgwegllpr;ppEyfqflC.-.___:' '-._---:=--.' ESflMTET .-.1pEppoolcro\0p _-pi+.lcrrvroncos'fiEur -._ - ["t,rro-rorsrevru -- - -1 _++oss='- !"f'*Ul* -uerolelfaSwltr-reealsorrrceori--- lor,l/EilrNc '- f ,- los.q.'..., J -- 266,10!0ua,rrv,arino'oar0irsefrrr o,,^-^l-tffi.;-#';;;:r' '-'ng11,io>i --- "tIl *roi ' s. : _ -._ ^vs, du ry.rrtr qll1ry.,rh is,*1ryffia calculatjons, depreciarion, eic.) ] -.
-
Jhe cost apolqacn was-d€vetoped wiih tne assis-tre of VarsSlia - -:eamrci.* -- . ";^1 il.ll. @_s
-
75.Qq . - 19,800
-"t . . '...--j-hy"'l .. lrclional
. --- t'ut'l
] DepreciatEd C0st oflmprovemenis =$ 1^2 efrt1
-nys'vare
or site rmprcwminG
rstnreonenainingL"oiurc-rlerruii-ilovqml, l0- vtari-rnorcareovnruieycodinmno,ri[- - - =s -oorsoo Estimated [nonthly lila;ket Rdt $ lndicated Value by lnc0me Apptoach &Cnffi APPF0AaH T0VALilE inotreoukeci by Fannie Mae)
Gross Denl \lu tp ie, - 5
^X
0Summary0l lncome Alpmach (i0ciudino suppoirfor nailct Entand GR0l) Total numbei oJ phases
i-or,,r *i,o.r rGiGir.na -
TotaL n!mberof units
- fo*l nrru".i rnlr. iriiit
li I9 .lt, 9.I1T_'r'elgm,r ory l*lgltion lj,lriti" ::T!l:r,l :Al9 ll9 !!mn9l. :llmtrts lea:ed-to 0. by the u0mmwre6 A$miation? Desc, oq con mo_ eicrrn's'ri o rccm"to-at t,cr,iter.
7 ';u-
Exhibit R
Rockwool Acoustic Material Research
trRoo,(woot
Version No: 2.1
lssued: 10/25/2022
Supersedes: 1 0/05/2A22
Safe Use lnstruction Sheet
This Safe Use lnstruction Sheet (5U15) is provided voluntarily for manufactured articles, which are neither regulated by OSHA Hazard Communication Standard,2g CFR 1910.1200 northe Canada Hazardous Products Regulation SOR/2015-17 [WFlMlS 2015]. ROCKWOOL provides this SUIS to communicate safe handling and use instructions.
Product Name
Synonyms
Manufacturer
Addresses
Phone Number
Email
CompanyWebsite
Resin-bonded stone wool insulation
Mineral wool insulation, mineral fiber insulation, stone wool insulation
ROCKWOOL
8024 Esquesing Line Milton, ON L9T 6W3, Canada
4594 Cayce Rd Byhalia, MS 3861 1, USA
1-877-823-9790 (8:30am to 5:00pm ET)
[email protected]
www. rockwool.com/north-a m erical
AFB@ evo
AFB@, Comfortbatte, Hus MBrM, ROXUL Safe@,
Safe'n'Sound@, Cavityrock@, Comfortboard@,
Curtainrock@. Rockboard@, FrontrockrM
Cavityrocko Black, Curtainrocko RFF,
Rockboard@ RFF
Mcnoboard6, Toprock@ DD
Toprock@ DD Plus, MultifixrM
Conrsckc, Fabrockru. MSB 85
ProRox@ NA. SeaRox@ NA
8024 Esquesing Line, Milton, Ontario, L9T 6W3
1 -877 -8?3-9790 I [email protected] I www.rockwool Formaldehyde-free unfaced interior
insulation batt
Unfaced insulation batts and boards
Faced interior and exterior insulation
boards
Unfaced roofing insulation boards
Faced roofing insulation boards
Unfaced batts and boards for OEM
applications
Unfaced industrial piping and
equipment insulation
rv.
ilt.
vt.
vlt.
com