AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02
1314 Le Borgne Avenue
6 GENERAL PLAN AMENDMENT AND ZONE CHANGE
The proposal requires a change in the Land Use Designation within the General Plan from Open Space to Residential and to change the zoning designation from Open Space (OS) to High-Density Residential (R-3). The following findings must be made to approve the General Plan Amendment and Zone Change requests:
(A) The amendment is consistent with all other goals, policies and objectives of the General Plan. The General Plan calls for a mix of housing options to serve the varied needs of current and future residents (LU Goal 1) and the proposal will introduce townhouse-style residential units as a rental product. Typically, townhomes are developed as condominiums for purchase, so the homes proposed with this development offer an option that is new and different to the community. General Plan Land Use Goal 2.0 calls for the accommodation of new development that is compatible with and compliments existing conforming land uses. The proposed development is for two-story multi-family housing which is consistent with the existing housing on the adjacent property to the northeast. The single-family residential properties in the neighborhood are developed with a mix of one and two-story homes. (B) The amendment will not adversely affect surrounding properties. The proposed use is residential, which is consistent with the surrounding uses. As such, it will not introduce noise, odors, or other more severe adverse impacts of more intense uses that are often restricted to Industrial-zoned properties. The topic of neighborhood impacts was more thoroughly examined in the Initial Study/Mitigated Negative Declaration (IS-MND) for the project. The areas analyzed for impact included: aesthetics; agriculture and forestry resources; air quality, biological resources; cultural resources; energy; geology and soils; greenhouse gas emissions; hazards and hazardous materials; hydrology and water quality; mineral resources; noise; population and housing; public services; recreation; and transportation; Tribal Cultural Resources, Utilities and Service Systems; and Wildfire. The IS-MND identified that there could be construction-related impacts in the areas of Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Noise, and Tribal Cultural Resources, but all of the potential impacts identified were determined to be less than significant with the application of mitigation measures. (see Exhibit 9, Final IS-MND). (C) The amendment promotes public health, safety and general welfare. The proposal is to create 104 new housing units in the City of Baldwin Park, which is roughly equal to the number of new units that are built within the City for a whole calendar year. The new housing would be sited on property that is currently vacant and has no productive use. The housing provided improves the general welfare of the City’s residents by providing new housing opportunities for families at a time when the State of California has declared a housing crisis. In addition to the new homes proposed, the Applicant will build a pocket park at the entrance to the development that will be open to the public but funded and maintained by the Applicant.
This additional park space provides recreational opportunities that promote the health and general welfare of the community. Furthermore, the Project will provide long-term financial benefits for BUSD, which can be applied to educational programs, facilities, and services for students within the school district. (D) The amendment serves the goals and purposes of the zoning code. The purpose of the Zoning Code is to establish development standards that carry out the vision and goals of the General Plan. Per State law, the Zoning Code and the General Plan are required to be consistent. The proposal for this project is to change the land use of the property to residential and to change the zoning to be High-Density residential, so therefore, the land use and zoning for the property will be consistent. With the approval of the Variance and Administrative Adjustment, the proposed project will be consistent with the proposed land use and zoning designation.
AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02
1314 Le Borgne Avenue
7 VARIANCE: PRIVATE OPEN SPACE
Per BPMC Section 153.040.030, a total of 200 square feet of private open space shall be provided per unit. Since this project is proposing 104 units, a sum of 20,800 square feet is required to be provided in the form of private yards, balconies, or a similar type of confined space. The applicant is proposing to provide 10,000 square feet of private open space, which is about half of the requirement. Also, the applicant is seeking flexibility in the configuration of the private open space provided. Per BPMC Section 153.040.040, the minimum length and width of each open space shall be ten feet, whereas the applicant is proposing to provide the following configurations: 21’-2” x 5’-0” and 7’-6 x 8’-0”. Approval of a Variance request require findings to be made that determine that the special circumstances exist that warrant the exception, the strict application of the development standard deprives the property of the privileges enjoyed by other similar properties in the area, and that the granting of the granting of the Variance does not constitute a grant of special privilege (BPMC 153.210.430).
The intent of the private open space requirement is to allow the residents of a development to have outside space for rest, recreation, and outdoor living. Each unit will have sufficient private open space to have either a porch or yard, so even with the granting of Variance, private outdoor space for each unit will be provided and the residents will not be deprived of the amenity that other units in the zone enjoy. The Applicant’s project originally was a three-story design that was easily able to meet the private open space requirement through the use of a large balcony on one of the upper levels. The fact that many of the adjacent neighbors are developed with single-story homes created a special circumstance in which large balconies on the upper floors that are compliant with the Municipal Code may create privacy concerns and may not be what is best for the neighborhood. In consideration of this context, the Applicant revised the design to eliminate private open space on the upper floors. The revision of the plans was in response to a specific context and does not constitute a special privilege for the Applicant or the development’s future residence. To the contrary, the elimination of balconies from the project is a sacrifice done for the benefit of the adjacent neighbors.
The variance is modest and is necessary to support a superior overall site design. It allows for the Project to provide an improved balance of private, common, and publicly accessible space, including the proposed public park and enhanced communal amenities. The variance also facilitates a more functional site layout and allows for the inclusion of larger family-oriented two-and three-bedroom units with private garages, while maintaining compatibility with the surrounding neighborhood and overall project design objectives.
ADMINISTRATIVE ADJUSTMENT: MAXIMUM BUILDING LENGTH
The proposed 104 residential units will be situated within buildings that have between two and six units. The longest buildings that have six units will have a building length that is 127’-10”, which is slightly longer than the maximum permitted building length of 125’-0” that is allowed by the BPMC. For deviations from development standards that are less than 10% of the required amount, the BPMC allows for an Administrative Adjustment to be approved by the City Planner provided the findings are met. The findings for an Administrative Adjustment that apply to this project require that the requested adjustment will not interfere with the purpose and intent of the zone, the conditional approval of the request will not be injurious to adjacent property, the conditional approval of the request will not adversely affect the General Plan, and the development resulting from the request results in superior design.
The purpose of the building length regulation is to prevent developments from becoming monolithic and massive in appearance. Without proper architectural treatment, longer residential buildings can appear imposing and massive. The Applicant’s design addresses that matter by incorporating architectural elements like gables that provide relief in the roof line and with breaks in the wall plane to create variation and visual interest. For the nine
AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02
1314 Le Borgne Avenue
8 (9) buildings within the subject development that exceed the maximum length, three gables are incorporated into the front of the building and two are incorporated into the back. For those same buildings, there are nine breaks in the wall plane on the front and three in the back, all of which contribute towards a superior design, which is better for the residents of the development and the community. It should be noted that none of the buildings that exceed the maximum length are sited immediately adjacent to the neighboring residential properties. While Administrative Adjustments are typically decided at the City Planner level, this application will be decided by the City Council due to a BPMC requirement which states that when a project with multiple entitlements is considered, all applications will be decided by the highest approval body.
Compliance with State Housing Laws
Every eight years the City is required to revise the Housing Element of the General Plan to remain in compliance with State law. To obtain approval of this Housing Element, it must, among other things, incorporate a plan to accommodate the number of housing units identified in the Regional Housing Needs Assessment (RHNA) that is generated by the Southern California Council of Governments (SCAG). For the current housing cycle that started in 2021, it was determined by SCAG that the City must plan for the development of 2,001 units across the spectrum of affordability categories by 2029. To date, the City of Baldwin Park has constructed 448 units. While the Housing Element does not require the City to construct the number of units allocated by RHNA, this is a considerable opportunity for the City to make gains towards the RHNA quota. While the Project is one of many in the City that will occur within this housing cycle, the number of units that would be approved would roughly equal the average number of units that are built within the City within a calendar year and therefore, would greatly assist the City in meeting its RHNA obligation.
The proposed Project is proposed as a market-rate development of two-story homes. If the Project is not approved, BUSD would have the option of re-applying and utilizing AB 2295 to bypass local review and gain approval.
This new law allows school districts to construct housing on their properties provided that the units are offered to BUSD employees, adjacent school district employees, local public agency employees, or the general public if the first three do not rent all the units (as further defined by Government Code Section 65914.7(a)(3)) and the majority of them are rented at an affordable rate, 30% of which is to be rented at a lower income rate. Also, this option would require the developer to construct units at the maximum height of 35’-0”, which is consistent with three-story developments. If this law were to be utilized, no General Plan Amendment or Zone Change would be required, and the Variance and Administrative Adjustment would likely be named as concessions or waivers afforded for providing affordable housing as allowed by California’s Affordable Housing Density Bonus law.
The remaining Design Review entitlement is ministerial and would not be brought to a public hearing for consideration.
Public Outreach and Responsive Project Scope Changes
The Applicant has participated in an open and public engagement process over the past 13 months. During that time, the Applicant held two public engagement sessions to explain the project to the community and received public input. The Applicant performed more engagement via door-to-door canvassing (see Exhibit 6).
Additionally, community members provided public input in the form of correspondence to Staff as well as via public comment at City Council and Planning Commission meetings (See Exhibits 7 and 9. For response to comments, see Exhibits 8 and 9). The topics of the comments received ranged widely, but repeated comments focused on the desire for a park, concerns about traffic, concerns about emergency services access, and
AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02
1314 Le Borgne Avenue
9 preservation of privacy. In response to comments received from the Planning Staff and the community, the Applicant made several revisions to the plans. The first change was to reduce the number of units from 105 to 104 to satisfy the maximum density requirement. Second, part of the Project site was set aside at the entry of the development as a parklet that would be for use by the development residents and the community. While open to the public, this parklet will be on private property and funded and maintained by the Applicant for the life of the lease. Third, the scale of the development was reduced by changing the apartments from three-story units to two-story units. The Applicant stated that the intent of this change was to make the development more compatible with the neighborhood and to better preserve privacy for the immediate neighbors. Fourth, the Applicant increased the points of access to the site from one to two. The Applicant’s stated intent for this change was to provide better access for emergency service access (though LACFD approved the project with one access point) and to disperse traffic. Fifth, the Applicant and BUSD together agreed to allow parking for the development on adjacent BUSD-owned property to prevent any guest parking overflow demand from spilling into the adjacent public streets. A condition of approval has been included with this staff report to require that this parking arrangement is made permanent through an irrevocable parking and access easement to be recorded with the County Recorder. Lastly, the Applicant agreed to fund the installation of a traffic signal at Barrydale Street and Puente Avenue to alleviate existing and anticipated traffic demand for the neighborhood. This is also included as a condition of approval for the project.
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)/NOTICING
The initial study prepared for the Project disclosed that the Project would potentially have a significant impact on the environment if mitigation measures were not adopted. Mitigation measures have been incorporated into the project’s design, as conditions of approval, and as part of a Mitigation Monitoring and Reporting Program to reduce impacts on the environment to a less than significant level. A Mitigated Negative Declaration of Environmental Impact has been prepared pursuant to the requirements of the California Environmental Quality Act (CEQA) of 1970, as amended. The Notice of Intent to Adopt a Mitigated Negative Declaration (NOI) was sent to the State Clearinghouse and County Clerk County of Los Angeles in accordance with CEQA and began a public review period from May 4, 2026 to June 4, 2026. The IS-MND is provided herein as Attachment #9.
The IS-MND reflects the City’s independent judgement and concluded that after mitigation, all of the Project’s impacts would be less than significant.
On May 4, 2026, legal notice was published in the Baldwin Park Press, posted at City Hall and the City of Baldwin Park website. Public Hearing Notices/Notice of Intent were also mailed to the property owners and occupants within a 300-foot radius of the subject property. During the public comment period it was discovered that the link to the environmental document did not function correctly. In light of this discovery, Staff determined that the public comment period should be extended to June 29, 2026 out of an abundance of consideration in favor of public engagement. Accordingly, a revised NOI/Public Hearing Notice was mailed to the owners and occupants within a 300-foot radius of the subject property and also sent to the State Clearinghouse and County Clerk. An additional public hearing notice was provided via mail, posting, and publication on July 9, 2026.
LEGAL REVIEW
This report has been reviewed and approved by the City Attorney as to legal form and content.
EXHIBITS
#1, Resolution of Approval- PC 26-07
#2, Architectural Plans
AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02
1314 Le Borgne Avenue
10 #3, Bassett Unified School District Letter re Public Outreach #4, LA County Public Works Traffic Determination
#5, LA County Fire Department Clearance
#6, Canvassing Information
#7, Public Comments Received Outside the Public Comment Period #8, BUSD Response to Public Comments
#9, Final Initial Study-Mitigated Negative Declaration available at:
#10, Vicinity Map
BASSETT VILLAS PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 APPLICANT: STORM PROPERTIES, INC. 970 W. 190TH STREET, SUITE 995 TORRANCE, CA 90502 CONTACT: STORM BIRD [email protected] (310) 986-2102 SHEET INDEX: T-1 TITLE SHEET A.0.1 SITE PLAN A.0.2 OPEN SPACE EXHIBIT A.0.3 FIRE ACCESS PLAN A.0.4 TRASH EXHIBIT A.0.5 EXISTING SITE PHOTOS A.2.1 FLOOR PLANS - UNITS 1, 1X & 2A A.2.2 FLOOR PLANS - UNITS 2AX & 2B A.3.1 BUILDING 2 - FLOOR & ROOF PLANS A.3.2 BUILDING 2 - ELEVATIONS A.3.3 BUILDING 4 - FLOOR PLANS A.3.4 BUILDING 4 - ELEVATIONS A.3.5 BUILDING 5 - FLOOR PLANS A.3.6 BUILDING 5 - ELEVATIONS A.3.7 BUILDING 6 - FLOOR PLANS A.3.8 BUILDING 6 - ELEVATIONS A.3.9 BUILDING 4L - FLOOR PLANS A.3.10 BUILDING 4L - ELEVATIONS A.3.11 BUILDING 5L - FLOOR PLANS A.3.12 BUILDING 5L - ELEVATIONS A.3.13 BUILDING 6L - FLOOR PLANS A.3.14 BUILDING 6L- ELEVATIONS A.3.15 BUILDING 5D - FLOOR PLANS A.3.16 BUILDING 5D - ELEVATIONS A.4.1 COLOR AND MATERIALS A.5.1 REC BUILDING A.5.2 MAINTENANCE BUILDING LANDSCAPE : SUMMERS/MURPHY & PARTNERS, INC. 34197 COAST HWY SUITE 200 DANA POINT, CA 92629 CONTACT: MIKE MANN [email protected] (949) 443-1446 X 235 TITLE SHEET ARCHITECTURE T-1 LANDSCAPE: L-1 PRELIMINARY LANDSCAPE PLAN L-2 PRELIMINARY ENTRY PLAN ENLARGEMENT L-3 PRELIMINARY PARK PLAN ENLARGEMENT L-4 PRELIMINARY PASEO ENLARGEMENT L-5 PRELIMINARY PASEO ENLARGEMENT L-6 PRELIMINARY WALL AND FENCE PLAN L-7 PRELIMINARY WALL AND FENCE DETAILS L-8 PRELIMINARY WALL AND FENCE DETAILS L-9 PRELIMINARY WALL AND FENCE PLAN-ELEMENTARY SCHOOL L-10 PRELIMINARY WALL AND FENCE PLAN-ELEMENTARY SCHOOL L-11 EXISTING TREES PLAN CIVIL: SHT 1 OF 4 CONCEPTUAL CIVIL GRADING PLAN STT 2 OF 4 CONCEPTUAL UTILITY PLAN SHT 3 OF 4 MILLBURY AVENUE STREET PLAN SHT 4 OF 4 GARBAGE TRUCK ACCESS TURNING STUDY ARCHITECT : ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA, CA 92705 CONTACT: CHRISTINE LY [email protected] (714) 285-1888 CIVIL : PSOMAS 865 S. FIGUEROA STREET SUITE 3200 LOS ANGELES, CA 90017 CONTACT: DAVID CURTIS [email protected] (213) 223-1524 BARRYDALE ST. MILLBURY AVE. WALNUT CREEK STITCHMAN AVE. VICINITY MAP
26'-0"
24'-0"
24'-0"
24'-0"
R17'-0" 27'-6" 26'-0" 26'-0" 24'-0" 26'-0" 26'-0"
R17'-0"
R17'-0"
R17'-0"
R17'-0"
R17'-0"
127'-10"
127'-10"
12'-1"
30'-0"
10'-0"
18'-0" 24'-0" 24'-0"
24'-0"
10'-0"
18'-0"
24'-0" 10'-0" 17'-0" 11'-0"
5'-0"
7'-0"
5'-0"
5'-0"
7'-0"
5'-0"
5'-0"
20'-1
3 4
" 5'-0" 16'-0"
5'-0"
6'-0"
5'-0"
6'-0"
12'-1"
12'-1"
10'-0"
24'-0" 26'-0"
34'-0"
R32'-0" TURNING
RADIUS
34'-6" 12'-7"
10'-0"
12'-0"
12'-1"
23 TOT LOT
MAIN. BLDG
12 2
COMMON OPEN SPACE
17 EVA W/
VEHICULAR
GATE- TENANT
EXIT ONLY
16 MAIL BOXES
POOL
PARK
26'W.
VEHICULAR
GATE CALL BOX
16'-0"
2'-0" 1ST FLOOR TO 1ST FLOOR 28'-9"
3'-4"
16'-0" 2'-0" GAR. TO GAR. 26'-6" 1ST FLOOR TO 1ST FLOOR 27'-9" GAR. TO GAR. 25'-7 1 2
" 25'-0" GAR. TO CURB 1ST FLR. TO CURB
3'-2"
28 MILLBURY AV
WALNUT CREEK
BARRYDALE ST WHITESELL ST
10'-0"
SETBACK 20'-0" SETBACK
10'-0"
SETBACK
10'-0" SETBACK
32 22'-0" 23'-6"
BLDG 2
BLDG 5
BLDG 5
BLDG 5
BLDG 6L BLDG 6L
BLDG 6L BLDG 5L
BLDG 6L BLDG 6L
BLDG 5L
BLDG 4
BLDG 6L
BLDG 6
BLDG 4L BLDG 5D BLDG 5D
BLDG 6 BLDG 6
BLDG 5L
B #1
B # 2
B # 3
B # 4
B # 5 B # 7
B # 9 B # 11
B # 6 B # 8
B # 10
B # 12
B # 13
B # 14
B # 18 B # 19 B # 20
B # 15 B # 16
B # 17
1 3 4 5 6 7 8 9 10
11 13
14 15
18 19
20 21
22 24
25 26 27 29 30 31
33 34
35 9'-0" 8'-0" 9'-0"
9'-0" 9'-0"
18'-0"
ADA
ADA ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA 5'-0" 7'-0" 5'-0" 5'-0" 5'-0"7'-0"
18'-0"
RECREATION
BUILDING
PHONE: PHONE: JOB:
BASSETT VILLAS BALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
04.10.26 2310
CONCEPTUAL SITE PLAN
SCHEME 15
ADDRESS: 1314 E. LE BORGNE AVENUE
BALDWIN PARK, CA
ZONE-PROPOSED RESIDENTIAL- R3
SITE AREA-GROSS5.22 ACRES (227,291 SF)
YIELD 104 UNITS
DENSITY 19.9DU/AC
OPEN SPACE REQUIRED :
COMMON OPEN SPACE : 250 X 104= 26,000 SF
PRIVATE OPEN SPACE : 200 X 104= 20,800 SF
TOTAL OPEN SPACE : 46,800 SF
PARKING:
REQUIRED:
104 UNITS 2 & 3 BED x 2.0 SPACES = 208.0 SPACES
104 UNITS x .33 GUEST SPACES= 35.0 SPACES
TOTAL REQUIRED = 243.0 SPACES
PROVIDED:
104 UNITS x 2 CAR GARAGE = 208 SPACES
PARALLEL PARKING - 10' x 23' = 11 SPACES
90 DEGREE PARKING - 8.5' x 18' = 24 SPACES
243 SPACES
PARKING RATIO: 243/104= 2.34
PRODUCT:
RENTAL TOWNHOUSES - 104 UNITS:
39 PLAN 1&1X - 1,060 SF, 2 BED, 2.5 BA, 2 CAR GAR.
36 PLAN 2A - 1,260 SF, 3 BED, 2.5 BA, 2 CAR GAR.
19 PLAN 2AX - 1,270 SF, 3 BED, 2.5 BA, 2 CAR GAR.
10 PLAN 2B - 1,300 SF, 3 BED, 2 BA, 2 CAR GAR.
104 TOTAL- TWO STORY
LOT COVERAGE: +/-92,388 / 227,291 = +/-40.6%
(60% MAX ALLOWED)
SITE PLAN A.0.1
0 20'
40'
80'
160'
OPEN SPACE PROVIDED :
COMMON OPEN SPACE : (20'x20' min.)
PRIVATE OPEN SPACE : 10,000 SF (94 units x100 sf
+10 units x60 sf )
TOTAL OPEN SPACE : 37,693 SF
PHONE: PHONE: JOB:
BASSETT VILLAS BALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
04.10.26 2310
OPEN SPACE EXHIBIT A.0.2
0 20'
40'
80'
160'
PRODUCT:
RENTAL TOWNHOUSES - 104 UNITS:
OPEN SPACE REQUIRED :
COMMON OPEN SPACE : 250 X 104= 26,000 SF
PRIVATE OPEN SPACE : 200 X 104= 20,800 SF
TOTAL OPEN SPACE : 46,800 SF
COMMON OPEN SPACE PROVIDED : (20',20' MIN.)
PRIVATE SPACE PROVIDED: 10,000 SF (94 units @100 sf )
+ (10 unit @60 sf )
TOTAL OPEN SPACE : 37,693 SF
150'
81'-7" 48'-0" 150'-0" 150'-0"
29'-3"
28'-0"
26'-8"
GAR. TO GAR.
1ST FLOOR TO 1ST FLOOR
2ND FLOOR TO 2ND FLOOR 127'-10"
29'-3"
28'-0"
26'-8"
GAR. TO GAR.
1ST FLOOR TO 1ST FLOOR
2ND FLOOR TO 2ND FLOOR 127'-10"
147' 52'
60'
50'
150' 50'
150' 150'
150'
150' 150'
55' 150'
55' 150' 150'
150' 120' 150' 150'150'
150' 150' 150'
139' 150' 52'
147'
150'
150' 150'
55'
26'-0"
24'-0"
24'-0"
24'-0"
R17'-0" 27'-6" 26'-0" 26'-0" 24'-0" 26'-0" 26'-0"
R17'-0"
R17'-0"
R17'-0"
R17'-0"
R17'-0"
127'-10"
127'-10"
12'-1"
30'-0"
10'-0"
18'-0" 24'-0" 24'-0"
24'-0"
10'-0"
18'-0"
24'-0" 10'-0" 17'-0" 11'-0"
5'-0"
7'-0"
5'-0"
5'-0"
7'-0"
5'-0"
5'-0"
20'-1
3 4
" 5'-0" 16'-0"
5'-0"
6'-0"
5'-0"
6'-0"
12'-1"
12'-1"
10'-0"
24'-0" 26'-0"
34'-0"
R32'-0" TURNING
RADIUS
34'-6" 12'-7"
10'-0"
12'-0"
12'-1"
23 TOT LOT
MAIN. BLDG
12 2
COMMON OPEN SPACE
17 EVA W/
VEHICULAR
GATE- TENANT
EXIT ONLY
16 MAIL BOXES
POOL
PARK
26'W.
VEHICULAR
GATE CALL BOX
16'-0"
2'-0" 1ST FLOOR TO 1ST FLOOR 28'-9"
3'-4"
16'-0" 2'-0" GAR. TO GAR. 26'-6" 1ST FLOOR TO 1ST FLOOR 27'-9" GAR. TO GAR. 25'-7 1 2
" 25'-0" GAR. TO CURB 1ST FLR. TO CURB 150'
3'-2"
28 MILLBURY AV
WALNUT CREEK
BARRYDALE ST WHITESELL ST
R300'-0"
R300'-0"
R300'-0"
R300'-0"
R300'-0" GARAGE TO CURB 25'-7
1 2
"
106'-6" 26'-6" 27'-9" GAR. TO GAR. 2ND FLOOR TO 2ND FLOOR 1ST FLOOR TO 1ST FLOOR 25'-2" 42'-6" 27'-6" 28'-9" GAR. TO GAR. 2ND FLOOR TO 2ND FLOOR 1ST FLOOR TO 1ST FLOOR 26'-2" 32 22'-0" 23'-6"
1 3 4 5 6 7 8 9 10
11 13
14 15
18 19
20 21
22 24
25 26 27 29 30 31
33 34
35 9'-0" 8'-0" 9'-0"
9'-0" 9'-0"
18'-0" 5'-0" 7'-0" 5'-0" 5'-0" 5'-0"7'-0"
18'-0"
RECREATION
BUILDING
PHONE: PHONE: JOB:
BASSETT VILLAS BALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
04.10.26 2310
FIRE ACCESS PLAN A.0.3
0 20'
40'
80'
160'
R=17' min.
R=43' FIRE LANE TURNING RADIUS
FIRE HOSE PULL & LENGTH
17' MIN. @ INSIDE CORNER
FRONT DOOR LOCATION OF BUILDING
LEGEND:
43' @ OUTSIDE CORNER
BUILDING TYPE CONSTRUCTION
TYPE
NO. OF
STORY OCCUPANCY SPRINKLER
TOWNHOUSES VB 2 R3-U2 13R
LEASING
BUILDING
VB 1 B1 FULL 13
26'-0" MIN. FIRE ACCESS LANE 26'-0" MIN.
150'
ADDITIONAL ALTERNATE ACCESS LANE
FIRE ACCESS PLAN
ADDRESS: 1314 E. LE BORGNE AVENUE
BALDWIN PARK, CA
ZONE-PROPOSED RESIDENTIAL- R3
SITE AREA-GROSS5.22 ACRES (227,291 SF)
YIELD 104 UNITS
DENSITY 19.9DU/AC
FIRE HYDRANTS WITHIN 300 FT
GARAGE TO CURB 25'-7
1 2
"
106'-6" 26'-6" 27'-9" GAR. TO GAR. 2ND FLOOR TO 2ND FLOOR 1ST FLOOR TO 1ST FLOOR 25'-2" 42'-6" 27'-6" 28'-9" GAR. TO GAR. 2ND FLOOR TO 2ND FLOOR 1ST FLOOR TO 1ST FLOOR 26'-2" BLDG 2
BLDG 5
BLDG 5
BLDG 5 BLDG 6L BLDG 6L BLDG 6L BLDG 5L
BLDG 6L BLDG 6L BLDG 5L
BLDG 4 BLDG 6L BLDG 6
BLDG 4L BLDG 5D BLDG 5D
BLDG 6 BLDG 6 BLDG 5L
B #1
B # 2
B # 3
B # 4 B # 5 B # 7 B # 9 B # 11
B # 6 B # 8 B # 10
B # 12 B # 13 B # 14
B # 18 B # 19 B # 20
B # 15 B # 16 B # 17
PHONE: PHONE: JOB:
BASSETT VILLAS BALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
04.10.26 2310
SITE PLAN A.0.4
TRASH EXHIBIT
TRASH EXHIBIT
ADDRESS: 1314 E. LE BORGNE AVENUE
BALDWIN PARK, CA
ZONE-PROPOSED RESIDENTIAL- R3
SITE AREA-GROSS5.22 ACRES (227,291 SF)
YIELD 104 UNITS
DENSITY 19.9DU/AC
0 8 16 32
SCALE: 1/16" = 1'-0"
PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 A.0.4 EXISITING SITE PHOTOS
C 100 B 103 102 101
LAVATORY VITREOUS CHINA MEMOIRS LAVATORY VITREOUS CHINA LAVATORY VITREOUS CHINA MEMOIRS LAVATORY VITREOUS CHINA B C B C 201 201 200 203 202 201 201 2-CAR GARAGE 20'-2" x 20'-2" P BA. 2 DN UP LIVING 12'-10" x 13'-9" KITCHEN 7'-10" x 9'-5" P. BEDRM 2 12'-11" x 13'-3" P. BEDRM 1 11'-10" x 14'-10" P BA. 1 PWD LAU PATIO TECH/LINEN FIRST FLOOR 2 BEDROOM UNIT - 1,060 SF SECOND FLOOR 21'-2" 39'-0" 21'-2"
35'-2" 103 102 100 101 C B
MEMOIRS LAVATORY VITREOUS CHINA
LAVATORY VITREOUS CHINA
MEMOIRS LAVATORY VITREOUS CHINA LAVATORY VITREOUS CHINA C C BA 2 BEDRM 3 10'-0" x 10'-4" DN 2-CAR GARAGE 20'-2" x 20'-2" UP LIVING 12'-10" x 16'-9" KITCHEN 7'-10" x 9'-5" P BA P. BEDRM 12'-11" x 13'-3" BEDRM 2 10'-3" x 11'-1" PWD P. CLT LAU PATIO LAVATORY VITREOUS CHINA 104 100 D105 LIVING 12'-7" x 16'-9" KITCHEN 8'-0" x 12'-4" PWD UP TECH/LINEN FIRST FLOOR 3 BEDROOM UNIT - 1,260 SF SECOND FLOOR FIRST FLOOR - ADA 21'-2" 42'-0" 21'-2"
40'-6" 100 NO. 200 2' - 2" 6' - 8" 202 2' - 6" 6' - 8" 206 2' - 8" 205 5' - 0" 201 2' - 4" 6' - 8" 6' - 8" 6' - 8" 204 5' - 0" 6' - 8" 203 2' - 10" 6' - 8" 101 16' - 0" 7' - 0" 102 2' - 8" 6' - 8" 103 2' - 6" 6' - 8" 104 3' - 0" 6' - 8" 105 2' - 10" 6' - 8" 106 2' - 4" 6' - 8" WOOD METAL WIDTH HEIGHT SIZE NO. ABCDE 2' - 0" 4' - 0" 3' - 0" 4' - 0" 5' - 0" 5' - 0" 1' - 6" 4' - 0" 5' - 0" 4' - 0" OPERATION SLIDING SINGLE HUNG SLIDING SINGLE HUNG SLIDING WIDTH HEIGHT 3' - 0" 8' - 0" SIZE TYPE SIZE TYPE NO. WIDTH HEIGHT WOOD METAL P BA. 2 P. BEDRM 2 12'-11" x 13'-3" PARTIAL SECOND FLOOR MEMOIRS LAVATORY VITREOUS CHINA B C 201 P. BEDRM 1 11'-10" x 14'-10" P BA. 1LAVATORY VITREOUS CHINA MEMOIRS LAVATORY VITREOUS CHINA B C 201 PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 0 1'2' 4' 8' UNITS 1 & 2A A.2.1 FLOOR PLANS PLAN 2A PLAN 1 DOOR SCHEDULE WINDOW SCHEDULE PLAN 1X
102 101 103
LAVATORY VITREOUS CHINA
MEMOIRS LAVATORY VITREOUS CHINA 8"
42'-9" 4'-3" 100 C 106 A C 202 202
LAVATORY VITREOUS CHINA C
42'-0" 5'-0"
8" C 201 201 206 E FIRST FLOOR 3 BEDROOM UNIT - 1,300 SF SECOND FLOOR 21'-2" 47'-0" 21'-2" 2-CAR GARAGE 20'-2" x 20'-2" P. BEDRM 2 12'-6" x 13'-0" P BA. 1 LAU BA. 2 BEDRM 3 10'-2" x 10'-9" BEDRM 2 10'-1" x 11'-8" LIVING 11'-2" x 21'-9" KITCHEN 10'-2" x 12'-4" 100 NO. 200 2' - 2" 6' - 8" 202 2' - 6" 6' - 8" 206 2' - 8" 205 5' - 0" 201 2' - 4" 6' - 8" 6' - 8" 6' - 8" 204 5' - 0" 6' - 8" 203 2' - 10" 6' - 8" 101 16' - 0" 7' - 0" 102 2' - 8" 6' - 8" 103 2' - 6" 6' - 8" 104 3' - 0" 6' - 8" 105 2' - 10" 6' - 8" 106 2' - 4" 6' - 8" WOOD METAL WIDTH HEIGHT SIZE NO. ABCDE 2' - 0" 4' - 0" 3' - 0" 4' - 0" 5' - 0" 5' - 0" 1' - 6" 4' - 0" 5' - 0" 4' - 0" OPERATION SLIDING SINGLE HUNG SLIDING SINGLE HUNG SLIDING WIDTH HEIGHT 3' - 0" 8' - 0" SIZE TYPE SIZE TYPE NO. WIDTH HEIGHT WOOD METAL 103 102 100 101 C B
MEMOIRS LAVATORY VITREOUS CHINA
LAVATORY VITREOUS CHINA
MEMOIRS LAVATORY VITREOUS CHINA LAVATORY VITREOUS CHINA C C BA 2 BEDRM 3 10'-0" x 10'-10" DN P BA P. BEDRM 12'-11" x 13'-3" BEDRM 2 10'-3" x 11'-7" P. CLT LAUTECH/LINEN SECOND FLOOR 21'-2" 41'-0" FIRST FLOOR 3 BEDROOM UNIT - 1,270 SF 2-CAR GARAGE 20'-2" x 20'-2" UP LIVING 12'-10" x 16'-9" KITCHEN 7'-10" x 9'-5" PWD PATIO 21'-2" 42'-0" PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 0 1'2' 4' 8' UNIT 2AX & 2B A.2.2 FLOOR PLANS PLAN 2B DOOR SCHEDULE WINDOW SCHEDULE PLAN 2AX
42'-6"
39'-0" UNIT 1X UNIT 1R
VITREOUS CHINA VITREOUS CHINA
VITREOUS CHINA VITREOUS CHINA
42'-6"
34'-6" UNIT 1X UNIT 1R
8"
VITREOUS CHINA VITREOUS CHINA
4:12 4:12
4:12 4:12
4:12 PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING 2 A.3.1 FLOOR PLANS BUILDING 2 - SECOND FLOOR BUILDING 2 - FIRST FLOOR 01'2' 4' 8' 16' BUILDING 2 - ROOF PLAN
T.O.SHTG
+/- 26'-2" T.O.PL.
9'-1" T.O.SLAB T.O.PL. T.O.ROOF9'-1" 4:12 4:12 4:12 LEGEND A - 'S' TILE CONCRETE ROOF B - 7" FOAM EAVE D - STUCCO E - VINYL WINDOW F - COMPOSITE ENTRY DOOR G - COMPOSITE SHUTTERS H - PANELED SECTIONAL GAR. DOOR I - STUCCO WRAPPED FOAM TRIM J - STUCCO WRAPPED FOAM CORBEL K - DECORATIVE GABLE VENT L - STUCCO WRAPPED FOAM HOOD M - STUCCO WRAPPED POT SHELF N - LOUVERED DOOR S - DECORATIVE STUCCO GRILL Y - METAL GUTTER & DOWNSPOUT PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING B2 REAR ELEVATION FRONT ELEVATION 01'2' 4' 8' 16' BUILDING 2 A.3.2 ELEVATIONS H M I F L K M A Y G I D E ROOF PLAN S G N I
85'-2"
39'-0" UNIT 1X UNIT 1R UNIT 1 UNIT 1XR
VITREOUS CHINA VITREOUS CHINA
VITREOUS CHINA VITREOUS CHINA
VITREOUS CHINA VITREOUS CHINA
VITREOUS CHINA VITREOUS CHINA 85'-2"
34'-6" UNIT 1X UNIT 1R UNIT 1 UNIT 1XR PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING 4 A.3.3 FLOOR PLANS BUILDING 4 - FIRST FLOOR BUILDING 4 - SECOND FLOOR 01'2' 4' 8' 16'
T.O.SHTG
+/- 26'-2" T.O.PL.
9'-1" T.O.SLAB T.O.PL. T.O.ROOF9'-1" 4:12 4:12 4:12 4:12 LEGEND A - 'S' TILE CONCRETE ROOF B - 7" FOAM EAVE D - STUCCO E - VINYL WINDOW F - COMPOSITE ENTRY DOOR G - COMPOSITE SHUTTERS H - PANELED SECTIONAL GAR. DOOR I - STUCCO WRAPPED FOAM TRIM J - STUCCO WRAPPED FOAM CORBEL K - DECORATIVE GABLE VENT L - STUCCO WRAPPED FOAM HOOD M - STUCCO WRAPPED POT SHELF N - LOUVERED DOOR S - DECORATIVE STUCCO GRILL Y - METAL GUTTER & DOWNSPOUT PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING B4 REAR ELEVATION FRONT ELEVATION LEFT ELEVATION RIGHT ELEVATION BUILDING 4 A.3.4 ELEVATIONS Y A E D M K L F I N G F M S I ROOF PLAN 01'2' 4' 8' 16' J
106'-6"
39'-0" UNIT 1X UNIT 1R UNIT 1 UNIT 1 UNIT 1XR
VITREOUS CHINA VITREOUS CHINA
VITREOUS CHINA VITREOUS CHINA
VITREOUS CHINA VITREOUS CHINA
VITREOUS CHINA VITREOUS CHINA
VITREOUS CHINA VITREOUS CHINA 106'-6"
34'-6" UNIT 1X UNIT 1R UNIT 1 UNIT 1 UNIT 1XR PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING 5 A.3.5 FLOOR PLANS BUILDING 5 - FIRST FLOOR BUILDING 5 - SECOND FLOOR 01'2' 4' 8' 16'
T.O.SHTG
+/- 26'-2" T.O.PL.
9'-1" T.O.SLAB T.O.PL. T.O.ROOF9'-1" 4:12 4:12 4:12 4:12 LEGEND A - 'S' TILE CONCRETE ROOF B - 7" FOAM EAVE D - STUCCO E - VINYL WINDOW F - COMPOSITE ENTRY DOOR G - COMPOSITE SHUTTERS H - PANELED SECTIONAL GAR. DOOR I - STUCCO WRAPPED FOAM TRIM J - STUCCO WRAPPED FOAM CORBEL K - DECORATIVE GABLE VENT L - STUCCO WRAPPED FOAM HOOD M - STUCCO WRAPPED POT SHELF N - LOUVERED DOOR S - DECORATIVE STUCCO GRILL Y - METAL GUTTER & DOWNSPOUT PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING B5 REAR ELEVATION FRONT ELEVATION LEFT ELEVATION RIGHT ELEVATION BUILDING 5 A.3.6 ELEVATIONS Y A E D M K L F IS N G F M L I ROOF PLAN 01'2' 4' 8' 16' J
127'-10"
39'-0" UNIT 1X UNIT 1R UNIT 1 UNIT 1R UNIT 1 UNIT 1XR 127'-10" 34'-6" UNIT 1X UNIT 1R UNIT 1 UNIT 1R UNIT 1 UNIT 1XR
VITREOUS CHINA VITREOUS CHINA
C B C B 201 201 200 202 203 201 201
VITREOUS CHINA VITREOUS CHINA B C B C 201 201 200 203 202 201 201 B C B C 201 201 200 203 202 201 201
VITREOUS CHINA VITREOUS CHINA
C B C B 201 201 200 202 203 201 201
VITREOUS CHINA VITREOUS CHINA B C B C 201 201 200 203 202 201 201
VITREOUS CHINA VITREOUS CHINA
C B C B 201 201 200 202 203 201 201 PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING 6 A.3.7 FLOOR PLANS BUILDING 6 - FIRST FLOOR BUILDING 6 - SECOND FLOOR 01'2' 4' 8' 16'
T.O.SHTG
+/- 26'-2" T.O.PL.
9'-1" T.O.SLAB T.O.PL. T.O.ROOF9'-1" 4:12 4:12 LEGEND A - 'S' TILE CONCRETE ROOF B - 7" FOAM EAVE D - STUCCO E - VINYL WINDOW F - COMPOSITE ENTRY DOOR G - COMPOSITE SHUTTERS H - PANELED SECTIONAL GAR. DOOR I - STUCCO WRAPPED FOAM TRIM J - STUCCO WRAPPED FOAM CORBEL K - DECORATIVE GABLE VENT L - STUCCO WRAPPED FOAM HOOD M - STUCCO WRAPPED POT SHELF N - LOUVERED DOOR S - DECORATIVE STUCCO GRILL Y - METAL GUTTER & DOWNSPOUT PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING B6 REAR ELEVATION FRONT ELEVATION LEFT ELEVATION RIGHT ELEVATION BUILDING 6 A.3.8 ELEVATIONS L Y A E D M K L F I F M S N G I ROOF PLAN 01'2' 4' 8' 16' J
85'-2"
42'-0" UNIT 2A UNIT 2AXR UNIT 2A UNIT 2AR
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
85'-2"
40'-6" UNIT 2A UNIT 2AXR UNIT 2A UNIT 2AR PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING 4L A.3.9 FLOOR PLANS BUILDING 4L - FIRST FLOOR BUILDING 4L - SECOND FLOOR 01'2' 4' 8' 16'
T.O.SHTG
+/- 27'-4" T.O.PL.
9'-1" T.O.SLAB T.O.PL. T.O.ROOF9'-1" 4:12 4:12 LEGEND A - 'S' TILE CONCRETE ROOF B - 7" FOAM EAVE D - STUCCO E - VINYL WINDOW F - COMPOSITE ENTRY DOOR G - COMPOSITE SHUTTERS H - PANELED SECTIONAL GAR. DOOR I - STUCCO WRAPPED FOAM TRIM J - STUCCO WRAPPED FOAM CORBEL K - DECORATIVE GABLE VENT L - STUCCO WRAPPED FOAM HOOD M - STUCCO WRAPPED POT SHELF N - LOUVERED DOOR Y - METAL GUTTER & DOWNSPOUT PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING B4L REAR ELEVATION FRONT ELEVATION LEFT ELEVATION RIGHT ELEVATION BUILDING 4L A.3.10 ELEVATIONS Y A E D K I F L I I F M L G N E F J I ROOF PLAN 01'2' 4' 8' 16' J
106'-6"
42'-0" UNIT 2A UNIT 2AXR UNIT 2A UNIT 2AX UNIT 2AR
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
C 106'-6"
40'-6" UNIT 2A UNIT 2AXR UNIT 2A UNIT 2AX UNIT 2AR PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING 5L A.3.11 FLOOR PLANS BUILDING 5L - FIRST FLOOR BUILDING 5L - SECOND FLOOR 01'2' 4' 8' 16'
T.O.SHTG
+/- 27'-4" T.O.PL.
9'-1" T.O.SLAB T.O.PL. T.O.ROOF9'-1" 4:12 4:12 LEGEND A - 'S' TILE CONCRETE ROOF B - 7" FOAM EAVE D - STUCCO E - VINYL WINDOW F - COMPOSITE ENTRY DOOR G - COMPOSITE SHUTTERS H - PANELED SECTIONAL GAR. DOOR I - STUCCO WRAPPED FOAM TRIM J - STUCCO WRAPPED FOAM CORBEL K - DECORATIVE GABLE VENT L - STUCCO WRAPPED FOAM HOOD M - STUCCO WRAPPED POT SHELF N - LOUVERED DOOR Y - METAL GUTTER & DOWNSPOUT PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING B5L REAR ELEVATION FRONT ELEVATION LEFT ELEVATION BUILDING 5L A.3.12 ELEVATIONS ROOF PLAN 01'2' 4' 8' 16' M L I J F I Y A E F E D K I F L I G N J
127'-10"
42'-0" UNIT 2A UNIT 2AXR UNIT 2A UNIT 2AR UNIT 2AX UNIT 2AR
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA C C
VITREOUS CHINA
VITREOUS CHINA
C C
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA 127'-10"
40'-6" UNIT 2A UNIT 2AXR UNIT 2A UNIT 2AR UNIT 2AX UNIT 2AR PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING 6L A.3.13 FLOOR PLANS BUILDING 6L - FIRST FLOOR BUILDING 6L - SECOND FLOOR 01'2' 4' 8' 16'
T.O.SHTG
+/- 27'-4" T.O.PL.
9'-1" T.O.SLAB T.O.PL. T.O.ROOF9'-1" LEGEND A - 'S' TILE CONCRETE ROOF B - 7" FOAM EAVE D - STUCCO E - VINYL WINDOW F - COMPOSITE ENTRY DOOR G - COMPOSITE SHUTTERS H - PANELED SECTIONAL GAR. DOOR I - STUCCO WRAPPED FOAM TRIM J - STUCCO WRAPPED FOAM CORBEL K - DECORATIVE GABLE VENT L - STUCCO WRAPPED FOAM HOOD M - STUCCO WRAPPED POT SHELF N - LOUVERED DOOR Y - METAL GUTTER & DOWNSPOUT 4:12 4:12 PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING B6L REAR ELEVATION FRONT ELEVATION LEFT ELEVATION RIGHT ELEVATION BUILDING 6L A.3.14 ELEVATIONS ROOF PLAN 01'2' 4' 8' 16' Y A E F E D K I F L I I J F I G N M L B J
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA 106'-6"
42'-0" UNIT 2B UNIT 2B UNIT 2B UNIT 2B UNIT 2BR
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
VITREOUS CHINA
44'-2" 106'-6" UNIT 2B UNIT 2B UNIT 2B UNIT 2B UNIT 2BR PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING 5D A.3.15 BUILDING 5D - FIRST FLOOR FLOOR PLANS BUILDING 5D - SECOND FLOOR 01'2' 4' 8' 16'
T.O.SHTG
+/- 27'-4" T.O.PL.
9'-1" T.O.SLAB T.O.PL. T.O.ROOF9'-1" 4:12 4:12 LEGEND A - 'S' TILE CONCRETE ROOF B - 7" FOAM EAVE D - STUCCO E - VINYL WINDOW F - COMPOSITE ENTRY DOOR G - COMPOSITE SHUTTERS H - PANELED SECTIONAL GAR. DOOR I - STUCCO WRAPPED FOAM TRIM J - STUCCO WRAPPED FOAM CORBEL K - DECORATIVE GABLE VENT L - STUCCO WRAPPED FOAM HOOD M - STUCCO WRAPPED POT SHELF N - LOUVERED DOOR S - DECORATIVE STUCCO GRILL Y - METAL GUTTER & DOWNSPOUT PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING B5D REAR ELEVATION FRONT ELEVATION LEFT ELEVATION RIGHT ELEVATION BUILDING 5D A.3.16 ELEVATIONS ROOF PLAN 01'2' 4' 8' 16' E A Y F K D O J I H S Y B N
PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 BUILDING 6L FRONT ELEVATION (PARTIAL) BUILDING 6 FRONT ELEVATION (PARTIAL) 1 5 2 7 1 4 6 2 5 7 3 2 4 9 BUILDING 6L REAR ELEVATION (PARTIAL) BUILDING 6 REAR ELEVATION (PARTIAL) 3 8 10 10 6 6 1 4 6 2 5 7 8 9 3 2 3 10 6 1 2 2 4 5 2 8 7 8 99 2 COLOR AND MATERIALS A.4.1 GABLE VENT (PAINTED TERRA COTTA) 11 11 2 TRIM: 2" THICK X 4 1/2" WIDE 10
30" 48"
60" MIN 56" MIN
30" 48"
60" MIN 56" MIN 30"
48" 60" MIN
56" MIN
44'-0" 46'-0" 1,292 SF CONDITIONED + 639 SFUNCONDITIONED WOMEN CHEMICALS 12'-0" x 11'-5" MEN SHWR STOR RESTROOM POOL EQUIP OPEN OFFICE LOUNGE GYM PATIO ELEC OFFICE 12'-9" x 11'-8" 12'-9" x 11'-8" 13'-6" +6'-2" x 24'-5" 16'-0" x 13'-2" LEGEND A - 'S' TILE CONCRETE ROOF B - 12" FOAM EAVE C - STUCCO R- METAL FENCING AND GATE T- DECORATIVE W I GRILL G - DECORATIVE GABLE VENT U- METAL GUTTER & DOWNSPOUT H - CERAMIC TILE OR SIMILAR I - PANELED SECTIONAL GAR. DOOR O- STUCCO WRAPPED FOAM CORBEL P- STUCCO WRAPPED FOAM TRIM J- STUCCO WRAPPED FOAM HOOD K- DECORATIVE STUCCO GRILL PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 01'2' 4' 8' 16' RECREATION BUILDING A.5.1 PLAN & ELEVATIONS ROOF PLAN FLOOR PLAN G C LEFT ELEVATION REAR ELEVATION FRONT/ENTRY ELEVATION RIGHT ELEVATION H O B A T R J R
434 SQ. FT.
34'-6" 12'-7" CART STOR. ELEC ENTRY MAINTENANCE WORK AREA 434 SF LEGEND A - 'S' TILE CONCRETE ROOF B - 12" FOAM EAVE C - STUCCO D - COMPOSITE LOUVER DOOR E - G - DECORATIVE GABLE VENT COMPOSITE ENTRY DOOR U- METAL GUTTER & DOWNSPOUT J- STUCCO WRAPPED FOAM HOOD K- DECORATIVE STUCCO GRILL L- TERRA COTTA PAVER PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 04.10.26 2310 ROOF PLAN 01'2' 4' 8' 16' MAINTENANCE BUILDING A.5.2 PLAN & ELEVATIONS LEFT ELEVATION J K FLOOR PLAN FRONT ELEVATION RIGHT ELEVATION REAR ELEVATION S D U G C A B
T
T
T
T
Xref xframe1-R.dwg
E RISR
333.20 EP
333.13 EP
332.94 EP
332.45 EP
331.33 EP
328.12 EP
328.68 EP
328.30 EP
328.71 EP
329.12 EP
329.01 EP
332.83 EP
331.99 EP
331.89 EP
329.82 EP
AD 1 STORY BRICK 1 STORY BRICK
332.94 BW
328.11 BW
328.03 BW
327.97 BW
327.89 BW
327.84 BW
327.64 BW 327.62 BW
327.44 BW
327.43 BW
327.45 BW
327.95 BW
328.05 BW
328.07 BW
328.12 BW
328.30 BW
328.49 BW
328.51 BW
329.87 BW
329.94 BW
329.92 BW
331.91 BW
331.99 BW
332.04 BW
332.08 BW
332.17 BW
332.24 BW
332.31 BW
332.36 BW
332.35 BW
332.35 BW
332.18 BW332.01 BW
332.01 BW
332.00 BW
332.04 BW
332.03 BW
332.03 BW
331.96 BW
332.05 BW
332.03 BW 332.05 BW
332.04 BW
332.01 BW
331.99 BW
331.70 BW
331.97 BW
332.17 BW
332.25 BW
332.35 BW
332.36 BW
332.31 BW
332.24 BW
332.25 BW
332.23 BW
332.26 BW
332.29 BW
332.17 BW
332.20 BW
332.09 BW
332.19 BW
331.67 BW
331.31 BW
331.67 BW
331.55 BW
331.64 BW
331.48 BW
331.53 BW
331.47 BW 331.45 BW
331.44 BW
33 332.17 BW
328.15 BW
328.07 BW
328.04 BW
327.70 BW
327.72 BW
327.77 BW
328.05 BW
328.18 BW
328.33 BW
328.39 BW
328.50 BW
328.61 BW
328.32 BW
331.87 BW
331.88 BW
331.83 BW
MH
329.70 EC
329.66 EC
329.75 EC
329.57 EC 329.60 EC
329.59 EC
CD
CD
331.67 Inv
330.65 Inv
331.89E
331.95 EC
331.95 EC
328.00 EC
327.99 EC
328.43 EC 329.84 EC
329.66 EC
328.50 EC
331.14 EC
331.54 EC
331.55 EC
331.60 EC
331.65 EC
331.75 EC
331.75 EC
331.60 EC
333.29 EC
331.45 EC
331.57 EC
331.50 EC
331.78 EC
332.01 EC
332.04 EC 332.02 EC
331.97 EC
331.92 EC
331.96 EC
331.97 EC
331.92 EC
332.09 EC
331.98 EC
331.91 EC
331.83 EC
331.79 EC
331.74 EC
331.71 EC
331.65 EC
331.59 EC
331.55 EC
331.50 EC
331.61 EC
331.62 EC
331.62 EC
331.66 EC
331.64 EC
331.96 EC
332.12 EC
332.08 EC
332.04 EC331.98 EC
331.97 EC
331.91 EC
332.03 EC
331.99 EC
332.08 EC
332.11 EC
332.08 EC
332.07 EC
332.16 EC
332.20 EC
332.16 EC
332.20 EC
331.89E
332.01 EC
331.96 EC
331.93 EC
332.04 EC
331.71 EC
331.65 EC
331.61 EC
331.65 EC
331.80 EC
331.83 EC
331.93 EC
331.94 EC
330.72 EC
330.81 EC
330.72 EC
330.71 EC
333.94 EC
331.82 EC
332.00 EC 332.01 EC
331.45 TG
330.72 TG
330.76 TG
331.60 TG
328.88 Inv
8INCH OUT 330.06 Inv
2INCH
331.00 Inv
2INCH
327.50 Inv 327.42 Inv
8INCH IN
327.34 Inv
12INCH OUT
328.27 TG
328.17 TG
329.72 Rim
D
D D
D
327.24 EG
327.16 EG
327.04 EG
326.93 EG
326.94 EG
326.88 EG
326.95 EG
327.02 EG
327.09 EG 327.05 EG
327.16 EG
327.22 EG
327.11 EG
327.05 EG
327.06 EG
327.02 EG 327.11 EG
327.28 EG
327.38 EG
327.50 EG
327.72 EG
327.79 EG
329.15 EG 329.12 EG
328.87 EG
329.19 EG
330.88 EG
330.78 EG
330.68 EG
330.56 EG
330.93 EG
330.84 EG
330.75 EG
330.65 EG
327.26 EG
327.42 EG
327.65 EG
327.74 EG
327.80 EG
4'
4' 8' 331.96 FL
331.93 FL
331
332.45 FL
328.14 FL
328.76 FL
328.89 FL
329.18 FL 329.29 FL
329.15 FL
329.83 FL
330.36 FL
331.08 FL
331.20 FL
331.22 FL
331.26 FL
331.33 FL
331.32 FL
331.28 FL
331.29 FL
331.38 FL
331.47 FL
331.50 FL
331.60 FL
331.60 FL
331.62 FL
331.70 FL
331.86 FL
331.87 FL
331.81 FL
331.80 FL
331.75 FL
331.75 FL
331.80 FL
331.76 FL
331.66 FL 331.63 FL 331.71 FL
331.54 FL 331.46 FL
331
332.19 FL
332.13 FL 332.06 FL
33 328.38 FL
328.66 FL
329.03 FL
328.87 FL
329.19 FL
329.57 FL
329.70 FL
330.30 FL
330.95 FL
331.04 FL
331.19 FL
331.26 FL
331.34 FL
331.40 FL
331.50 FL
331.48 FL
331.45 FL
331.65 FL
331.72 FL
331.80 FL
331.79 FL
331.86 FL
331.92 FL
332.09 FL
332.12 FL
332.07 FL
332.01 FL
332.11 FL
332.13 FL
329.31 FL
329.19 FL
329.25 FL 329.39 FL
329.84 FL
330.35 FL
330.82 FL
330.71 FL
330.50 FL
329.96 FL
327.09 FL
327.03 FL
326.95 FL
326.85 FL
326.85 FL
326.78 FL
326.82 FL
326.88 FL
327.05 FL
327.12 FL
327.23 FL
327.23 FL
327.34 FL
327.56 FL
327.72 FL
329.06 FL
330.69 FL
330.50 FL
330.72 FL
330.48 FL
330.42 FL
330.74 FL
330.68 FL 330.76 FL
330.61 FL
330.58 FL
330.44 FL
327.14 FL
327.16 FL
327.33 FL
327.20 FL
327.27 FL
327.35 FL
327.47 FL
327.58 FL
327.65 FL
327.69 FL
326.91 FL
326.96 FL
326.98 FL
326.99 FL
327.13 FL
331.54 FL
331.78 FL
331.80 FL
FLAG
4FT W.I.
330.01 GB
329.83 GB
327.81 GB
327.68 GB 327.10 GB
327.11 GB
328.78 GB
329.50 GB
331.88 GB
331.92 GB
331.68 GB
332.49 GB
GPGP
GPGPGP
GP GP
GP GP
GP
GP GP
GATE
GATE
GATE
GATE
GATE
GATE
332.3 332.7
332.7
331.6
331.8 331.8
331.8
332.0
332.0
332.1 332.1
332.2
332.3 332.2
332.3
332.0 331.9
331.8
331.6
331.8
331.8
331.8
331.9 332.0 331.7 331.8
331.8
331.5 331.7 GV HOSE BIB HOSE BIB HOSE
331.28
331.75 Lid 331.88 Lid
331.89 Lid
331.75 Lid
332.22 Lid
332.10 Lid
332.10 Lid
331.61 TC
331.25 TC
332.18 TC
332.17 TC
332.25 TC
332.31 TC
332.30 TC
332.27 TC
332.22 TC
332.14 TC
331.96 TC
331.96 TC
332.04 TC
331.99 TC 332.03 TC
332.06 TC 332.08 TC
332.3
327.55 GB
327.39 GB
327.07 GB 327.06 GB
327.43 GB
327.64 GB
327.33 GB
327.32 GB
327.68 GB
332.09 GB331.76 GB
331.66 GB
331.63 GB
331.75 GB
SS CO
SS CO SS CO
SS CO SS CO
S
SS
S
S
SMH
SMH
SMH
327.54 Rim
328.32 Rim
331.11 Rim
331.83 Rim
331.63 331.82
327.77
327.74
327.65
327.64
327.63
327.56
327.52
327.69 327.84
328.75
328.00
328.13
328.04
328.70
329.17
329.49 329.67
330.46
328.95
329.36
328.40 331.03
330.30 331.32
330.89 331.28 331.33
331.40
331.40
331.35
331.49
331.41
331.49
331.54 331.60
331.64
331.78
331.99
332.01
331.96
331.92
332.01
331.88 331.79 331.69 331.68 331.64
331.02
331.15
331.24 331.32
33 332.1
331.99
327.98
327.92 328.11
328.18
328.21 329.04
328.87
328.24
329.69
329.90
329.93
329.85
329.90
329.97
329.90
331.90
331.91
331.88 331.91
331.87
331.88
331.90
331.82
331.87 331.94
331.95
331.49
331.93 331.93331.97
331.96
331.94
332.16
331.83
331.94
331.85
331.85 332.00
331.85
331.97
332.19
332.1 332.6 332.6 332.6
332. 332.5
332.0 33
328.2
327.9
328.4
328.1
328.0
327.9
328.3
327.8
328.0
328.2
328.0
328.0
327.9
328.4
327.8
328.1
327.9
328.6
328.2
328.5328.4
328.1 328.3
328.6
328.2328.6
329.4 330.6 331.4 331.1
330.4330.7 330.7
330.1 329.5
331.7
331.5 331.4 331.6
331.7
330.9 330.7
330.3
329.6
329.5
331.3
331.2 331.2
331.3
331.4
331.6
331.5
331.4
331.8 331.9
332.0
332.1 332.1
331.7 332.0
331.6
331.6
331.7
331.7 331.7
331.7
331.9 332.1
332.0 331.8
331.8
331.7
331.9
331.9
331.9
332.2
332.1 332.4
332.3
332.4
332.4
332.4 332.5
332.7 332.6 332.7
.6
330.9
331.5 331.3
331.5
331.4
331.9
332.0
331.7
330.6 330.7
330.6 333.1
332.2
332.3
331.7
331.4
331.1 332.1
332.0
332.0 332.0
331.9
331.9 331.8331.9 331.9331.9 331.9
331.9331.8331.7 331.6
331.7
331.9 331.8 331.9
331.6
331.4331.5
331.5
331.7
331.8
332.1 331.6
331.95 FF
LINO
332.03 FF
CARPET
332.46 TC
332.45 TC
332.97 TC
327.77 TC
327.71 TC
327.59 TC
327.51 TC
326.95 TC
326.94 TC
326.92 TC
327.44 TC
327.52 TC
327.55 TC
327.07 TC
327.05 TC
327.06 TC
327.75 TC
327.79 TC
327.86 TC
327.88 TC
327.33 TC
327.39 TC
327.90 TC
328.15 TC
328.27 TC
328.55 TC
328.21 TC
328.60 TC
329.31 TC
329.55 TC
329.69 TC 329.73 TC
329.75 TC
329.71 TC
329.66 TC
329.72 TC
330.27 TC
330.86 TC
331.68 TC
331.67 TC
331.65 TC
331.66 TC
331.68 TC
331.75 TC
331.75 TC
331.75 TC
331.76 TC
331.80 TC
331.87 TC
331.94 TC
332.00 TC
332.08 TC
332.17 TC
332.27 TC
332.28 TC
332.20 TC
332.17 TC
332.15 TC
332.17 TC
332.19 TC
332.18 TC
332.09 TC
331.66 TC
331.63 TC
332.09 TC 332.10 TC
332.07 TC 331.93 TC
330.74 TC
331.34 TC
331.31 TC
330.74 TC
330.59 TC
330.63 TC
331.14 TC
331.07 TC
330.83 TC
331.26 TC
331.29 TC
331.17 TC
331.17 TC 330.60 TC
330.55 TC
331.01 TC
331
332.65 TC
332.61 TC
332.60 TC
332.53 TC
332
327.81 TC
327.82 TC
327.80 TC
327.33 TC
327.33 TC
327.32 TC
327.79 TC
327.78 TC
327.78 TC
327.93 TC
327.94 TC
327.48 TC
327.52 TC
327.60 TC
328.21 TC
328.28 TC
328.30 TC
328.32 TC
328.82 TC
328.98 TC
329.53 TC
329.60 TC
329.60 TC
329.76 TC
329.81 TC
330.08 TC
329.82 TC
330.76 TC
331.56 TC
331.63 TC
331.65 TC
331.70 TC
331.73 TC
331.79 TC
331.90 TC
331.92 TC
331.92 TC
332.05 TC
332.11 TC
332.20 TC
332.23 TC
332.31 TC
332.37 TC
332.43 TC
332.56 TC
332.52 TC
332.43 TC
332.60 TC
332.65 TC
332.18 TC
332.20 TC
332.19 TC
329.73 TC
329.62 TC
329.65 TC 329.72 TC
330.25 TC
330.80 TC
331.29 TC
331.20 TC
330.95 TC
330.47 TC
327.62 TC
327.89 TC
327.93 TC
327.85 TC
327.95 TC
328.03 TC
328.00 TC
327.98 TC
328.00 TC
328.03 TC
UPC 1060192E
UPC 1313090E
UP UP
UP
328.29 EC
329.23 EC
329.11 EC
330.71 EC
330.74 EC
330.61 EC
331.96 EG
331.95 EG
331.76 EG
331.71 EG
331.65 EG
331.89 EG
331.97 FL
331.71 FL
331.85 FL
331.97 FL
330.55 TW
330.79 TW
329.89 TW
329.82 TW
329.71 TW
329.73 TW
333.69 TW
333.74 TW
336.44 TW
336.39 TW
336.44 TW
332.57 TW 332.82 TW
332.74 TW
332.43 TW
331.41 TW
330.85 TW
330.00 TW
335.07 TW
328.01 BW
327.99 BW
327.92 BW
327.81 BW
327.68 BW
327.63 BW
327.64 BW
327.57 BW
327.75 BW
327.96 BW
328.00 BW
328.06 BW
328.17 BW
328.25 BW
328.42 BW
328.47 BW
328.27 BW
331.54 BW
331.42 BW
331.29 BW
331.25 BW
331.54 BW
331.38 BW
331.21 BW
331.17 BW
331.37 BW
331.42 BW331.42 BW
331.41 BW
331.38 BW
331.20 BW
327.99 BW
327.94 BW 327.82 BW
327.78 BW
327.91 BW
327.97 BW
328.10 BW
328.19 BW
328.25 BW
328.29 BW
328.40 BW
328.46 BW
328.30 BW
WM
WV RESIDENTAL
WALK
WALK
CONC SIDEWALK
WALK
CONC SIDEWALK WALK
CONC SIDEWALK
WALK
CANOPY
LID
CB
CB
GRATE GRATE
SD PMRK
APPROACH
APPROACH
APPROACH
CONC GUTTER
CHLK FENCE
NCE
CHLK FENCE
CHLK FENCE
CHLK FENCE
CLF
CHLK FENCE CLF CHLK FENCE CHLK FENCE CLF
CLF CHLK FENCE
CHLK FENCE
CLF
CHLK FENCE
WDN FENCE
WDN FENCE
GATE
GATE
GATE
GATEGATE GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE GATE
GATE G PMRK
U LID
U LID
MOW STRIP
MOW STRIP
UPB WPB
GPB
PILASTER HC PARKING
STD PARKING
RAMP
RAMP
RAMP
SS PMRK CONC CURB
CONC CURB
CONC CURB
CONC CURB
CONC CURB
CONC CURB
CONC CURB CONC CURB
T.P.
T.P.
U VLT
U VLT
U VLT
V-GUTTER
WALK
WALK
WALK
WALK
WM
WM
RET WALL
RET WALL
RET WALL
RET WALL
RET WALL
RET WALL
RET WALL
RET WALL
W STRU
CHLK FENCE HC PARKING
APPROACH
D D
STD PARKING
STD PARKING
D D D D D GRASS GRASS CONC SIDEWALK CONC SIDEWALK CONC SIDEWALK D D D BIB 331.8
331.8
332.3
CONC SIDEWALK
CONC SIDEWALK
D D D
APPROACH
GATE APPROACH
CD CD CD
345.79
BLDG HP
343.62
BLDG HP
354.06
BLDG HP
342.39
BLDG HP
CONC CURB
CONC CURB
CONC
CURB CONC
CURB
18"
1"
1"
4"
6"
20" 20"
20"
20"
28"
8"
8" DN 7.5' SS PMRK
DN 10' SS PMRK
E/F CLF 0.45' W
W/F CLF 0.82' E
W/F CLF 0.78' E N/F Ret Wall 0.10' S N/F CLF 0.32' S S/F CLF 0.87' N N/F Ret Wall 0.28' S S/F CLF 1.11' N N/F Ret Wall 0.31' S S/F CLF 0.76' N
N/F Ret Wall 0.82' S S/F CLF 0.89' N
N/F WDF 0.21' S S/F CLF 0.92' N
N/F WDF 0.23' S S/F CLF 0.97' N
N/F Ret Wall 0.14' S S/F CLF 0.98' N W/F Ret Wall Crosses PL W/F WDF 0.26' E
N/F Ret Wall 0.28' S
N/F Ret Wall 0.28' S
N/F CLF 0.45' S
N/F CLF Crosses PL
S/F CLF 1.47' N
S/F CLF 0.90' N N/F CLF Crosses PL
N/FCLF0.24
E/F CLF 1.06' W
1 STORY BRICK 1 STORY BRICK
1 STORY BRICK
STD PARKING
OVERHANG
CHLK FENCE CHLK FENCE
CHLK FENCE CHLK FENCE GATE GATE GATE GATE
GATE GATE UPB
331.80 EP 331.73 EP 331.64 EP
331.63 EP
331.28 EP
331.13 EP
331.01 EP
330.91 EP
330.83 EP
330.79 EP
330.83 EP 330.78 EP
330.90 EP
331.01 EP 331.44 EP 331.92 EP
330.76 EP
330.74 EP 330.48 EP
330.43 EP
330.44 EP
330.48 EP
330.79 EP
331.00 EP
331.32 EP
331.61 EP
331.72 EP
330.98 EP
330.80 EP330.99 EP331.04 EP
330.61 EP
MH
SDMH
332.04 EC
331.94 EC
332.04 EC 332.02 EC 332.02 EC 331.99 EC
332.06 EC
332.01 EC
331.81 EC
331.74 EC
331.63 EC
331.44 EC
331.42 EC
331.61 EC
331.59 EC 331.46 EC
331.46 EC
331.62 EC
331.76 EC
331.84 EC
331.90 EC
331.79 EC
331.30 EC
330.68 EC
330.91 EC
331.29 EC
331.50 EC
331.43 EC
331.36 EC
331.19 EC
330.89 EC
330.27 EC
330.13 EC
330.05 EC
329.84 EC
329.84 EC
328.25 EC
330.61 EC
330.64 EC
329.00 EC
330.49 EC
331.64 EC 331.79 EC
328.13 Rim
328.94 Rim
331.62 FL
331.59 FL 331.41 FL 331.30 FL
331.09 FL
330.77 FL
330.25 FL
330.11 FL
330.08 FL
329.72 FL
331.87 FL
331.79 FL
328.34 FL
331.59 Lid 331.45 Lid
331.45 Lid
331.57 Lid
331.61 Lid
331.38 Lid
331.43 Lid
331.59 Lid
331.79
330.48 330.69
330.68 330.90
331.09
331.30 331.69
332.03 332.04
331.76
331.37
331.13
330.95
330.69
330.48
330.76 331.07
331.44
331.67 332.00
331.87 331.76 331.77
331.29
331.41 331.19 330.87
331.35 331.45
331.32 331.17
330.87
330.08
330.45330.90 331.46
331.39
330.3
331.7 331.5
331.2
330.7
330.4
330.6
330.4
330.1 330.0
330.0 329.8
330.8
331.0 331.1
330.7
330.3 330.3
330.4
331.4 331.4
331.5
331.4
331.3
331.3 331.4 331.5
331.4 331.3 331.4
331.5 331.5 331.4
330.6
329.6
329.4
329.3 329.1
328.8 329.4
329.5
329.9 330.0
330.4
330.8 331.0
330.9
330.7
331.5 331.7
331.1 331.3 331.1 331.4 330.6
331.99 TC
332.08 TC 331.87 TC
331.65 TC331.79 TC
331.49 TC
331.37 TC
330.08 Toe
328.74 Toe 328.21 Toe
328.24 Toe
329.00 Toe
329.27 Toe
329.75 Toe
328.05 Toe
328.28 Toe
328.66 Toe 328.58 Toe
328.82 Toe
330.08 Top
330.15 Top
329.60 Top 329.39 Top
329.39 Top
329.52 Top
329.70 Top
329.75 Top
330.07 Top
330.09 Top
330.24 Top
329.82 Top
330.15 Top
24"
36"
24"
330.61 TW
330.65 TW
330.68 TW
330.65 TW
331.87 FF
3' Door
329.19 Toe 330.70 Top
329.87 Toe 330.27 EP
331.36 EC
HOSE BIB
331.40 EC 331.88 FF
3' Door
330.22 EC
329.91 EC
329.89 FL
LE BORGNE AV
BARRYDALE ST.
MILLBURY AV
WALNUT CREEK
WALNUT CREEK
> >
> > > > > > > >
> >
> > > >
> > >
> > > > > > > > > >
> > > > > >
> > > > > >
> > > > >
> > > >
> > > > > > > > > > >
> >
0.50% 0.50%
332.90GL
0.50% HP
333.71TC
61.90'
OLMOS, RODOLFO
SOLIS, OLGA
VELASQUEZ, NORMA JEAN
RODRIGUEZ, ALONZO
CASILLAS, CLAUDIA
MENDIAS, SILVANO
LOPEZ, CARMEN
MORENO, REGINALDO
TRAC, QUY
LECHUGA, ANA B
HUANG, YANHONG
GAIMES, ADAN GOMEZ BARRIOS, MICHAEL J CHAVEZ, VENTURA
MENOR, WILSUN OMNAS
FRIZZELLE, PATRICK A ARENAS, FRANCISCO M ZAYAS, MARIANO M CASTRO, NOE A MAGANA, ABEL G RUELAS BELONGIE, AMELIA
VALENZUELA, JOSE MANUEL CONDOMINIUMS MULTIPLE OWNERS MOBILE HOMES MULTIPLE OWNERS 1% MIN.
0.50% 0.50%
0.50% 0.50% 0.50% 0.50%
0.50% 0.50% 0.50%
0.70% 0.50% 10% 1.01% 0.97%
0.50%
0.50%
3.6% 0.55%
0.50%
HP
POOL EDGE
=333.0 0.55%
1.25%
0.50% 0.50%
0.50%
10'
332.60FL
332.66GL
332.84FL
332.90GL
PE=333.1
FS
332.94
PE=333.1
TG
332.43
PE=332.9
333.21FS 332.80FS
333.30TC
333.10FS
333.60TC
332.62FS
333.12TC 331.84 TG
332.49FL
332.55GL
PE=332.6 PE=332.4
PE=332.6 PE=332.4 11'
TG
331.43
S=0.0100
331.60FG
1.7' RET.
PE=332.0
331.86FS
332.36TC
TG
330.99
TG
331.26 331.91 TG 332.58TC 332.08FS
PE=332.4
PE=332.2
PE=332.2
PE=332.0
PE=332.2
PE=332.0 333.23TC 332.73FL
PE=332.9
PE=332.7
PE=332.8
PE=332.6
PE=333.4
PE=333.2 332.56 TG 333.77TC 333.27FL 334.16TC 333.66FS 332.20FG 1.96'CF PE=333.4
PE=333.2
PE=331.8 PE=331.7 PE=331.9 PE=332.4 PE=332.6
PE=333.2
PE=333.2
PE=333.4
PE=333.3 PE=333.5
PE=332.8 PE=333.0
PE=332.1 PE=332.4 PE=332.7 PE=332.9
PE=332.1 PE=332.4
2.0%
(0.2%)
2.0%
(0.2%) 2.0%
X
X
X
X
X
X
X
X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
PROPOSED RETAINING
CURB AT PL (24" MAX.)
(331.5)
FG
332.40TC
(330.60) FG
1.8' CF
(331.60)
FG
333.40TC
(331.40)FG
2.0' CF
332.40TC
332.30FG
0.1' CF
332.40TC
(330.70) FG
1.7' CF
332.40TC
(332.00) FG
0.4' CF
(328.13)RIM
(324.2)±
APPROX. INV.
PROPOSED RETAINING
CURB AT PL (24" MAX.)
332.60TC
(331.8) FG
0.8' CF
(332.1)
FG
PROPOSED RETAINING
CURB AT PL (24" MAX.)
332.50TC
332.50FG
(331.8)FG
PROPOSED RETAINING 0.7' CF
CURB AT PL (24" MAX.)
(331.6)
FG
333.70TC
(331.7)FG
2.0' CF
333.80TC
(332.0)FG
1.8' CF
PROPOSED RETAINING
CURB AT PL (24" MAX.)
332.70TC
(332.2)FG
0.5' CF
332.10TC
(331.8)FG
0.3' CF
332.20TC
(331.8)FG
0.4' CF
PROPOSED RETAINING
CURB AT PL (24" MAX.)
PROPOSED RETAINING
CURB AT PL (24" MAX.)
332.70TC
(332.0)FG
0.7' CF
(332.6)
FG
332.50TC
332.50FG
(332.0)FG
0.5' CF
(332.45)TC
(332.02)FS
(331.07)TC
(330.42)FS
(331.36)TC
(330.70)FS
330.76
HP/FL
(331.57)TC
(331.53)FL
330.52
HP/FL
331.40
FS
331.64
FS
331.73TC
331.61FL
332.95TC
332.45FL
EX. INLET TO REMAIN 332.53TC
332.03FS 332.43TC 331.93FS
333.46TC
332.96FS
332.70TC
(332.5)FG
0.2'CF
333.50TC
(333.2)FG
0.3'CF 333.36TC 332.86FS
(331.89)TC
(331.46)FS
331.74TC
331.24FL
PROPOSED RETAINING
CURB AT PL (24" MAX.)
333.1TRW
(332.1)FG
1.0'RET.
332.14TC
331.64FL
332.97TC
332.37FS
331.54
FL
333.05TC
332.55FS
333.1TRW
(332.0)FG
1.1'RET.
332.80TRW
(332.0)FG
1.8'RET.
332.00TC
331.30FG
(332.0)FG
0.7' CF
333.75TC
332.97 333.25FL
FL
333.11
HP/FL
331.49
TG
331.65FL
331.71GL
332.17TC
331.77FL
332.60
FS
333.05TC
332.55FS
332.02TC
331.52FL
(332.9)
FG
334.20TC
(334.2)FG
332.5FG
1.7'CF
PROPOSED RETAINING
CURB AT PL (24" MAX.)
(334.1)FG
334.20TC
(334.2)FG
332.8FG
1.4'CF
334.20TC
(334.2)FG
332.8FG
1.4'CF
334.10TC
(334.1)FG
332.6FG
1.4'CF
333.80TC
(333.8)FG
332.2FG
1.6'CF
333.80TC
(333.8)FG
332.0FG
1.8'CF
333.90TC
(333.9)FG
331.9FG
2.0'CF
333.30TC
(333.3)FG
331.3FG
2.0'CF
(333.6)
FG
PROPOSED RETAINING
CURB AT PL (24" MAX.)
333.90TC
(331.40) FG
0.5' CF
(331.82)BW
332.36BW
332.26TC
331.76FS
0.5'CF
332.46TC
331.96FS
0.5'CF
332.10TC
331.60FS
0.5'CF
332.46TC
331.96FS
0.5'CF
332.10TC
331.60FS
0.5'CF
332.73TC
332.23FS
0.5'CF
332.37TC
331.87FS
0.5'CF
332.90BW
332.43BW
332.70BW
332.67TC
332.17FS
0.5'CF
332.31TC
331.81FS
0.5'CF
332.64TC
332.14FS
0.5'CF
332.28TC 332.70BW
331.78FS
0.5'CF
EXISTING GATE TO BE REMOVED
PROPOSED RECIPROCAL EASEMENT
FOR INGRESS/EGRESS, UTILITIES
PROPOSED
RECIPROCAL
EASEMENT FOR
INGRESS/EGRESS,
UTILITIES
PROPOSED RECIPROCAL
EASEMENT FOR
INGRESS/EGRESS,
UTILITIES Plotted - 12/11/2025 10:27:15 AM :: Saved - 12/11/2025 10:26:18 AM :: J:\LA\1STO031000\CADD\Design\Exhibits\BP-EXH-03-CONCEPTGRAD.dwg :: ismael.pablo 865 SOUTH FIGUEROA STREET, SUITE 3200
LOS ANGELES, CA 90017
213.223.1400
DATE:
SCALE:
PROJECT
NUMBER:
DESIGNED:
DRAFTED:
CHECKED:
REV DATE DESCRIPTION BY APP'D
SEAL SHEET:
OF:
STORM PROPERTIES
CONCEPTUAL CIVIL GRADING PLAN
BALDWIN PARK, CA
12/11/25
1"=40'
1STO031000
1 1
DZ
DZ
DC
EARTHWORK QUANTITY:
CUT 2,000 CY
FILL 4,550 CY
NET IMPORT 2,550 CY
PLAN
40'
GRAPHIC SCALE: 1"=40'
20' 0 40' 80'
4
T S M
S M
L S M
L
S M
L
SM
L SM
L
S M
L
S M
L
SM
L M
T
T
T
T
T
Xref xframe1-R.dwg
61.90'
9 4
30'
30' 27' 27'
990.49'
150' 102.80' L=216.52' 8.45'
Δ=32°28'22"
R=382.03' 111.25'
S80°59'33"E 856.87'
272.36'
272.36'
N09°00'27"E 135.20'
301.44'
CL CL
LC
CL
CL
CL
60' 54'
S80°59'33"E 856.87' 171.81'
277.26'
N41°30'29"E
PROPOSED FIRE
HYDRANT
10' EASEMENT
SOUTHERN PARCEL
LINE OF LOT 129
LOT 129
CENTER OF PIPE IS 5' FROM 10' EASEMENT
30'
30' 27' 27'
990.49'
150' 102.80' L=216.52' 8.45'
Δ=32°28'22"
R=382.03' 111.25'
S80°59'33"E 856.87'
272.36'
272.36'
N09°00'27"E 135.20'
301.44'
CL CL
LC
CL
CL
CL
60' 54'
LACSD 42" TRUNK
SEWER LINE
60" SS MANHOLE
60" SS MANHOLE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
10' UTILITY
EASEMENT
LE BORGNE AV
BARRYDALE ST.
MILLBURY AV
WALNUT CREEK
WALNUT CREEK
S80°59'33"E 856.87' 171.81'
277.26'
N41°30'29"E
10' EASEMENT
SOUTHERN PARCEL
LINE OF LOT 129
LOT 129
CENTER OF PIPE IS 5' FROM 10' EASEMENT
DISCHARGE OVERFLOW
TO STREET GUTTER
LACSD 42" TRUNK
SEWER LINE
60" SS MANHOLE
60" SS MANHOLE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
10' UTILITY
EASEMENT
APPROX. LOCATION LID DRYWELL SYSTEM
PROPOSED STORM DETENTION PIPE
PROPOSED STORM DETENTION PIPE
PROPOSED STORM DETENTION PIPE
865 SOUTH FIGUEROA STREET,
SUITE 3200
LOS ANGELES, CA 90017
213.223.1400
DATE:
SCALE:
PROJECT
NUMBER:
DESIGNED:
DRAFTED:
CHECKED:
REV DATE DESCRIPTION BY APP'D
SEAL SHEET:
OF:
STORM PROPERTIES
CONCEPTUAL UTILITY PLAN
BALDWIN PARK, CA
12/11/25
1"=40'
1STO031000
2 2
DZ
DZ
DC
STORM DRAIN LINE
DOMESTIC WATER LINE
FIRE WATER LINE
SANITARY SEWER LINE
LACSD 42" TRUNK SEWER LINE
EXISTING 8" WATER LINE
PROPOSED FIRE HYDRANT
LEGEND
PLAN
40'
GRAPHIC SCALE: 1"=40'
20' 0 40' 80' Plotted - 12/11/2025 10:32:29 AM :: Saved - 12/11/2025 10:32:20 AM :: J:\LA\1STO031000\CADD\Design\Exhibits\BP-EXH-02-CONCEPTUTIL.dwg :: ismael.pablo 4
332.45 EP
331.33 EP
332.83 EP
331.99 EP 331.39 BW
332.19 BW
331.67 BW
331.67 BW
331.41 BW
331.31 BW
331.55 BW
331.64 BW
331.48 BW
331.53 BW
331.47 BW 331.45 BW
331.44 BW
CD 330.65 Inv
331.71 EC
331.57 EC
331.60 EC
333.29 EC
331.45 EC
331.57 EC
331.50 EC
331.78 EC SD CO
330.88 EG
330.78 EG
330.68 EG
330.56 EG
330.93 EG
330.84 EG
330.75 EG
330.65 EG
331.84 FL
331.71 FL
331.53 FL
331.46 FL
330.69 FL
330.50 FL
330.72 FL
330.48 FL
330.42 FL
330.74 FL
330.68 FL
330.76 FL
330.61 FL
330.58 FL
330.44 FL
SMH SMH
331.11 Rim
331.83 Rim
328.02
331.93
331.38 331.45
331.63
332.10
332.27
331.02 331.15
331.24
331.32
332.39
331.83
331.94
332.6
331.6
333.1
330.9
331.5
331.3 331.5
331.4 331.9 332.0
332.27 TC
332.15 TC
331.46 TC
330.74 TC
331.34 TC
331.31 TC
330.74 TC
330.59 TC
330.63 TC
331.14 TC
331.07 TC
330.83 TC
331.26 TC
331.29 TC
331.17 TC
331.17 TC 330.60 TC
330.55 TC
331.01 TC
333.69 TW
333.74 TW
331.54 BW
331.42 BW
331.29 BW
331.25 BW
331.54 BW
331.38 BW
331.21 BW
331.17 BW
331.37 BW
331.42 BW331.42 BW
331.41 BW
331.38 BW
331.20 BW
WALK
APPROACH
X
X
X
X CHLK FENCE
X
X
X
GATE G PMRK
PILASTER
SS PMRK U PMRK CONC CURB U PMRK
WALK
WM
RET WALL APPROACH
GATE APPROACH
CONC
CURB
CONC
CURB
DN 7.5' SS PMRK
DN 10' SS PMRK
CL
MILLBURY AVENUE
(331.32)
BW
(331.21)
SW
(331.08)TC
(330.43)FL
(332.45)
EP
0.70%
330.60FS
(330.52)FL
0.88%
331.39 BW (2.8%)
(331.36)TC
(330.70)FL
(331.46)BW
(331.60)
BW
(0.59%)
EDGE OF
EXIST. D/W
(0.24%)
(331.49)
SW
331.32SW 1.8%
331.37SW 10%7.4%
(0.54%)
(331.02)
FS
(331.15)
FS
(331.24)
(0.31%) FS
(331.32)
FS
(0.40%)
331.15TC
(331.53)FL
(332.27)TC
(331.84)FL 0.83%
331.15TC
(331.57)FL 1.0%
1.5%
0.70%
330.84FS
330.76FL
0.50%
> >
> > > > > > > > > HP
332.43TC
331.93FS
332.53TC
332.03FS
1.0%
331.40BW 6.0%
332.12TC
331.62FS
0.94% 27' 27' 54'
CL
12+00 13+00 14+00 12+78.44 BCR JOIN EX. CURB 12+38.47 BCR JOIN EX. CURB 13+08.48 CL
30' D/W
1 3 3
4 5
2 6
30' DRIVEWAY 30' Plotted - 12/11/2025 10:31:52 AM :: Saved - 12/11/2025 10:31:43 AM :: J:\LA\1STO031000\CADD\Design\Exhibits\BP-EXH-04-MILLBURY-RD.dwg :: ismael.pablo 865 SOUTH FIGUEROA STREET, SUITE 3200
LOS ANGELES, CA 90017
213.223.1400
DATE:
SCALE:
PROJECT
NUMBER:
DESIGNED:
DRAFTED:
CHECKED:
REV DATE DESCRIPTION BY APP'D
SEAL SHEET:
OF:
STORM PROPERTIES
MILLBURY AVENUE STREET PLAN
BALDWIN PARK, CA
12/11/25
1"=10'
1STO031000
3 3
DZ
DZ
DC
PLAN
10'
GRAPHIC SCALE: 1"=10'
5' 0 10' 20'
1 30' DRIVEWAY APPROACH
2 CONCRETE CURB
3 CONCRETE SIDEWALK
4 2' SAWCUT EXISTING PAVEMENT
5 5' OVERLAY
6 CONCRETE CURB AND GUTTER
STREET IMPROVEMENT
CONSTRUCTION NOTES
4
OLMOS, RODOLFO
SOLIS, OLGA
VELASQUEZ, NORMA JEAN
RODRIGUEZ, ALONZO
CASILLAS, CLAUDIA
MENDIAS, SILVANO
LOPEZ, CARMEN
MORENO, REGINALDO
TRAC, QUY
LECHUGA, ANA B
HUANG, YANHONG
GAIMES, ADAN GOMEZ BARRIOS, MICHAEL J CHAVEZ, VENTURA
MENOR, WILSUN OMNAS
FRIZZELLE, PATRICK A ARENAS, FRANCISCO M ZAYAS, MARIANO M CASTRO, NOE A MAGANA, ABEL G RUELAS BELONGIE, AMELIA
VALENZUELA, JOSE MANUEL CONDOMINIUMS MULTIPLE OWNERS
E RISR MOBILE HOMES MULTIPLE OWNERS
MH
D
D D
D
4'
4' 8'
FLAG
32.49GB
GPGP
GPGPGP
GP GP
GP GP
GP
GP GP GV
327.55 GB
327.39 GB
327.07 GB 327.06 GB
327.43 GB
327.64 GB
327.33 GB
327.32 GB
327.68 GB
332.09 GB331.76 GB
331.66 GB
331.63 GB
331.75 GB
S
SS
S
S
SMH
SMH
SMH
UPC 1060192E
UPC 1313090E
UP UP
UP
331.97 FL
331.71 FL
331.85 FL
331.97 FL
WM
WV
WALK
WALK
CONC SIDEWALK
WALK
CONC SIDEWALK WALK
CONC SIDEWALK
WALK
CANOPY
LID
CB
CB
APPROACH
APPROACH
APPROACH
CONC GUTTER
CHLK FENCE
X
X
X
X
X
X
NCE
CHLK FENCE
CHLK FENCE
X
X
X
CHLK FENCE
X
X
X
X
X
X
X
X
X
X
CLF X
X X
CHLK FENCE CLF X CHLK FENCE CHLK FENCE CLF
CLF CHLK FENCE
X
X
X
X
X
X
X
CHLK FENCE
CLF
CHLK FENCE X
WDN FENCE
WDN FENCE
o o o o o o o o o o o o o o o o G PMRK
U LID
U LID
PILASTER
RAMP
RAMP
RAMP
SS PMRK
T.P.
T.P.
U VLT
U VLT
U VLT
V-GUTTER
WALK
WALK
WALK
WALK
WM
WM
RET WALL
RET WALL
RET WALL
RET WALL
RET WALL
RET WALL
RET WALL
RET WALL
X X X
CHLK FENCE
APPROACH
D D
D D D D D
D D D CONC SIDEWALK
CONC SIDEWALK
D D D
APPROACH
APPROACH
X
DN 7.5' SS PMRK
DN 10' SS PMRK GATE GATE GATE GATE
GATE GATE UPB
MH
SDMH
T
T
T
T
Xref xframe1-R.dwg
> >
> > > > > > > >
> >
> > > >
> > >
> > > > > > > > > >
> > > > > >
> > > > > >
> > > > >
> > > >
> > > > > > > > > > >
> >
X
X
X
X
X
X
X
X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
MILLBURY AV
BARRYDALE ST.
LE BORGNE AV
WALNUT CREEK
WALNUT CREEK
Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck 24.0'
24.0'
18.3'
30.1'
12.8' 26.0' 26.0'
26.0' 22.0'
Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck Rear-Load Garbage Truck
Rear-Load Garbage Truck
Rear-Load Garbage Truck Plotted - 12/11/2025 10:28:21 AM :: Saved - 12/11/2025 10:26:09 AM :: J:\LA\1STO031000\CADD\Design\Exhibits\BP-EXH-11-GARBAGE TRUCK TURNING STUDY.dwg :: ismael.pablo 865 SOUTH FIGUEROA STREET, SUITE 3200
LOS ANGELES, CA 90017
213.223.1400
DATE:
SCALE:
PROJECT
NUMBER:
DESIGNED:
DRAFTED:
CHECKED:
REV DATE DESCRIPTION BY APP'D
SEAL SHEET:
OF:
STORM PROPERTIES
GARBAGE TRUCK ACCESS
TURNING STUDY
BALDWIN PARK, CA
12/11/2025
1"=40'
1STO031000
AN
AN
SL
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
40' 0 40' 80'
40'
20' 160'
GARBAGE TRUCK WHEEL TRACK (S ENTRY)
GARBAGE TRUCK BODY TRACK (S ENTRY)
LEGEND
GARBAGE TRUCK WHEEL TRACK (NW ENTRY)
GARBAGE TRUCK BODY TRACK (NW ENTRY)
35'
4.5' 20'
Rear-Load Garbage Truck
Overall Length Overall Width
Overall Body Height Min
Body Ground Clearance
Track Width Lock-to-lock
time Curb to Curb Turning
Radius
35.000ft
8.375ft
10.546ft
1.000ft
8.375ft
6.00s
29.300ft
4 4 4
Writer's E-Mail: [email protected]
Writer's Direct Dial: (310) 228-2082
File Number
4752.002
December 12, 2025
VIA E-MAIL ONLY
City of Baldwin Park
Attn: Nick Baldwin, City Planner
14403 E Pacific Av
Baldwin Park, CA 91706
Telephone: (626) 960-4011, ext. 475
Email: [email protected]
Re: Bassett Unified School District Response to City of Baldwin Park Regarding General Plan Amendment 25-01; Zone Change Z 25-01; Zone Variance 25-02; Design Review PR 25-17; Administrative Adjustment AA 25-02; and Lot Line Adjustment; APN: 8558-023-910 Baldwin Park, CA 91706
Dear Mr. Baldwin,
On behalf of the Bassett Unified School District (“District”), our firm submits these responses to the City of Baldwin Park’s (“City”) November 5, 2025, correspondence to Storm Properties, Inc. (“Storm”) regarding the Bassett Villas at Baldwin Park Project (“Joint Occupancy Project” or “Project”).
1. Outreach and Project Selection
The District conducted a multi-year procurement process for the Joint Occupancy Project at the Florence Flanner property (“Property” or “School”), beginning in 2022. a. Procedures and Outreach
The District complied with all necessary procedures and engaged in thorough outreach activities to ensure the Project is planned and implemented to provide the greatest possible benefit to all parties involved and affected. Some of those activities included the following:
Attorneys at Law
www.ohhlegal.com
1901 Avenue of the Stars, Suite 575
Los Angeles, CA 90067
6200 Stoneridge Mall Road, Suite 225
Pleasanton, CA 94588
2877 Historic Decatur Road, Suite 200
San Diego, CA 92106
13181 Crossroads Parkway N., Suite 170
City of Industry, CA 91746
650 Lighthouse Avenue, Suite 240
Pacific Grove, CA 93950
333 City Blvd. West, Suite 1700
Orange, CA 92868
3600 Lime Street., Building 2 Office #218
Riverside, CA 92507
December 12, 2025
April 2022 - June 2024 – The District conducted five closed and two open sessions. During open session presentations, the Joint Occupancy statutes and procedures were reviewed with the Board and for the community’s benefit. (Link to May 24, 2022, open session presentation:
https://simbli.eboardsolutions.com/Meetings/Attachment.aspx?S=36030837&AID=269956&MI D=10684; link to October 25, 2022, open session presentation:
https://www.dropbox.com/scl/fi/v431zhp5buzm6q0etau68/2022-10-25-Joint-Occupancy-Presentation-TG-rev.pptx?rlkey=d66pavwy3ds1d5yq3gm148vnr&st=1pap2evd&dl=0) October 25, 2022 – The Board approved a resolution of intention to issue a Request for Qualifications/Proposals (“RFQ/P”) for joint occupancy development of the Property. (Link to resolution:
https://simbli.eboardsolutions.com/Meetings/Attachment.aspx?S=36030837&AID=365703&MI D=16007)
March 13, 2023 – The District issued the RFQ/P.
September 12, 2023 – The Board adopted a resolution authorizing negotiation of an exclusive negotiating agreement with Storm Properties and declaring the Property exempt surplus land. (Link to resolution:
https://simbli.eboardsolutions.com/Meetings/Attachment.aspx?S=36030837&AID=596050&MI D=23571)
After the Storm proposal was selected, the District and Storm complied with all necessary procedures and engaged in thorough outreach activities to ensure the Project is planned and implemented to provide the greatest possible benefit to all parties involved and affected.
February 15, 2024 – Storm presented the Project to the Mayor, City Manager, and Community Development Director.
February 23, 2024 – The District and Storm entered into the Exclusive Negotiating Agreement.
March 21, 2024 – Storm submitted the pre-application to the City to confirm the Project’s alignment with the City’s and community’s goals.
April 3, 2024 – Storm made an informational presentation to the City Council.
December 18, 2024 – Storm held a community outreach/informational presentation meeting to receive feedback and discuss potential concerns. Adjustments to the preliminary site plan were subsequently made in response to community feedback.
December 12, 2025
January 17, 2025 – Storm presented the Project to the Office of Los Angeles County Supervisor Hilda Solis and her staff. Review of the Project by the Fire Department and incorporation of requested safety measures. The County Public Works Department submitted comments regarding circulation and access.
March 18, 2025 – Storm held a second community outreach meeting/informational presentation to the community. More adjustments were made to the site plan that was being developed based on feedback received.
May 29, 2025 – Storm submitted the entitlement application, which is currently under review.
Based on these steps and the scope of the outreach conducted, the Project appropriately reflects and incorporates the community’s needs.
b. Project Selection
The Board selected the current Project for several reasons, primarily including, but not limited to:
• Long-term, stable revenue: The ground lease and joint occupancy structure will provide the District with long-term, stable revenue to support and improve educational programs and facilities needs without the type of restrictions that accompany funds derived from other types of dispositions of school district property (e.g., sale of surplus property). • Enrollment and under-utilization: The District, like many in California, has experienced ongoing declining enrollment, resulting in excess and under-utilized sites and site capacity.
Repurposing under-utilized sites for residential uses benefits the District, surrounding neighborhood, and broader community.
• Multifamily housing as best use: The proposed size and style of the Project (104 market rate multifamily units) provide the City with necessary family-oriented housing, which may also lead to increased District enrollment and further support for District programs.
Further, this use constitutes the highest and best use of the Property. • District ownership and control: Lastly, through the joint occupancy framework, the District:
◦ Retains ownership (and some control) of the Property, ◦ Continues beneficial community recreational opportunities (pocket park), and ◦ Increases local economic activity from new residents.
All meetings may be cross-referenced through the District’s YouTube channel here:
https://www.youtube.com/@superintendentsoffice3126/streams.
2. Building numbers will be provided on a Site Plan to assist with building identification.
December 12, 2025
3. Campus Fencing and Security
The District acknowledges that the driveway connecting the Project to Millbury Avenue and Le Borne Avenue is within the School’s existing perimeter, and that the existing fences and gates that now secure the School will be modified or removed to create the necessary driveway connection.
The District consents to any reconfiguration necessary and reasonable to accommodate the Project’s connection to Millbury Avenue and Le Borne Avenue.
4. Public Park
The District has no legal obligation to provide a public park alongside the Project. However, in response to community input, the District and Storm are working together to incorporate a publicly accessible “pocket park” as part of the Project. The park will include such features as a trellis, sitting area, open play/sitting area, and walking path.
Very truly yours,
ORBACH HUFF & HENDERSON LLP
Sarine A. Abrahamian
SAA:OHH
COUNTY OF LOS ANGELES
DEPARTMENT OF PUBLIC WORKS
“To Enrich Lives Through Effective and Caring Service”
900 SOUTH FREMONT AVENUE
ALHAMBRA, CALIFORNIA 91803-1331
Telephone: (626) 458-5100
http://dpw.lacounty.gov
July 15, 2026
MARK PESTRELLA, Director
ADDRESS ALL CORRESPONDENCE TO:
P.O. BOX 1460
ALHAMBRA, CALIFORNIA 91802-1460
IN REPLY PLEASE
REFER TO FILE: T-4
Ms. Storm Bird
Storm Properties
970 West 190th Street, Suite 995
Torrance, CA 90502
Dear Ms. Bird:
LE BORGNE RESIDENTIAL PROJECT
TRANSPORTATION IMPACT ANALYSIS (JULY 2026)
CITY OF BALDWIN PARK
Public Works has reviewed the Transportation Impact Analysis (TIA) dated July 2026 for the Le Borgne Residential Project. The project proposes 104 multi-family dwelling units.
The project site is located within the City of Baldwin Park.
Recommended Improvements
Based on the TIA, the installation of a traffic signal is recommended at the following intersection below. We generally agree with the findings of the TIA.
Barrydale Street and Puente Avenue
Public Works generally agrees with the improvement recommended above. Detailed traffic signal plans and signing and striping plans for the improvements shall be approved by Public Works prior to first certificate of occupancy.
The project shall install the traffic signal and associated signing and striping in accordance with County standards. Prior to the issuance of the first certificate of occupancy, the project shall complete the improvements to the satisfaction of Public Works.
Ms. Storm Bird
July 15, 2026
If you have any questions regarding the review of this document, please contact Mr. James Harris of Traffic Safety and Mobility Division, at (626) 300-4646 or [email protected].
Very truly yours,
MARK PESTRELLA, PE
Director of Public Works
BRIAN SMITH, PE
Principal Engineer
Traffic Safety and Mobility Division
JH:jta
SP:\TSM\DOC\STU\LTRSMEMS\2026716ESTU2025000511LeBorgneResidentialTIA bc: Land Development (Su, Lasso)
LE BORGNE
RESIDENTIAL
PROJECT
Transportation Impact Analysis
Prepared for:
Los Angeles County Public Works
July 2026
LA25-3620
P
TABLE OF CONTENTS
Introduction........................................................................................................................................1 Project Description........................................................................................................................................................1 Study Scope ....................................................................................................................................................................3 Traffic Operations Analysis and Scenarios ....................................................................................................3 Existing Conditions ..........................................................................................................................6 Data Collection...............................................................................................................................................................6 Existing Roadway System...........................................................................................................................................6 Analysis Methodology..................................................................................................................................................6 Los Angeles County LOS Criteria .....................................................................................................................6 Los Angeles County Operational Deficiencies.............................................................................................7 Intersection Operational Analysis.............................................................................................................................7 Existing Traffic Volumes......................................................................................................................................7 Existing Conditions Level of Service...............................................................................................................9 Existing Conditions Queues ...............................................................................................................................9 Project Conditions ...........................................................................................................................11 Project Trip Generation...............................................................................................................................................11 Project Traffic Distribution....................................................................................................................................... 12 Project Traffic Assignment....................................................................................................................................... 12 Future Year (2028) Plus Project Conditions ...............................................................................15 Ambient Growth Rate................................................................................................................................................. 15 Related Projects........................................................................................................................................................... 15 Future Year (2028) Conditions Traffic Conditions.......................................................................................... 15 Future Plus Project Queues.......................................................................................................................................17 Traffic Signal Warrant Analysis................................................................................................................................ 19 CA MUTCD Warrants and Guidance............................................................................................................. 19 Signal Warrant Analysis.....................................................................................................................................20 Proposed Traffic Signal.....................................................................................................................................23 Site Plan Review..........................................................................................................................................................23 Site Access Study Screenings ........................................................................................................................23 Summary and Conclusions ............................................................................................................25
P
APPENDICES
Appendix A - VMT Analysis and Findings
Appendix B- Traffic Count Sheets
Appendix C - Traffic Operations Synchro Reports: LOS, Delay, and Queues Appendix D - Signal Warrant Analysis Worksheets
P
LIST OF FIGURES
Figure 1. Project Site Plan ...................................................................................................................................................2 Figure 2. Study Intersections and Location................................................................................................................. 4 Figure 3. Existing Conditions AM and PM Peak Hour Traffic Volumes.............................................................. 8 Figure 4. Proposed Daily Project Trip Distribution.................................................................................................. 13 Figure 5. Project Only Trip Assignment Volumes – AM (PM) Peak Hour........................................................14 Figure 6. Future Year (2028) Plus Project Traffic Projections ............................................................................16
LIST OF TABLES
Table 1 – LOS Criteria for Unsignalized Intersections ...............................................................................................7 Table 2 – Existing Conditions LOS and Delay Results..............................................................................................9 Table 3 – Existing Conditions Queue Lengths..........................................................................................................10 Table 4 – Project Vehicle Trip Generation Estimates - Weekday....................................................................... 11 Table 5 – Future (2028) Plus Project LOS and Delay Results.............................................................................. 17 Table 6 – Future (2028) Plus Project Queues ..........................................................................................................18 Table 7: Signal Warrant Analysis Summary – Barrydale Street & Puente Avenue........................................20 Table 8: Signal Warrant Analysis Summary – Van Wig Avenue & Francisquito Avenue............................. 21
Draft Transportation Impact Analysis | 1
Introduction
Fehr & Peers conducted a study to evaluate the potential transportation impacts of the proposed Le Borgne multi-family residential project (Project) located in the City of Baldwin Park. This report documents the parameters, methodologies, and findings, per the requirements from Los Angeles County Public Works Transportation Impact Analysis Guidelines (County’s TIA Guidelines), July 2020.
Project Description
The Project site is located on a 5.26-acre parcel south of Walnut Creek and north of Le Borgne Avenue in the City of Baldwin Park and Los Angeles County Supervisorial District 1, shown in Figure 1.
The Assessor’s Identification Number (AIN) for the parcel on which the Project is located is 8558- 023-910.
1 The project site is located at the southern edge of Baldwin Park, adjacent to unincorporated Los Angeles County. County roads will provide primary access from Le Borgne Avenue just north of Millbury Avenue. Therefore, the transportation study is in alignment with the County’s TIA Guidelines. Construction on the Project is anticipated to begin in the second quarter of 2026 with a buildout year of 2028.
The Project would entitle 104 multi-family dwelling units and would provide 239 parking spaces, with 208 spaces in two-car garages attached to the proposed dwelling units, and 31 on-street parking spaces. The Project will redevelop a former school site, which operated as an elementary school until 1989. There is currently a preschool/daycare with 38 students operating out of the western building, and 10 school district staff operating out of the eastern building. The School Board has confirmed there is no intention of increasing the use of the property beyond current operations. 1 The Assessor’s Identification Number (AIN) is a ten-digit number assigned by the Office of the Assessor to each piece of real property in Los Angeles County.
Figure 1
PROJECT SITE PLAN
Draft Transportation Impact Analysis | 3
Study Scope
The scope of work for this study was determined in consultation with the County of Los Angeles Department of Public Works staff, and in accordance with the County’s TIA Guidelines.
Traffic Operations Analysis and Scenarios
This study includes intersection-level operational analysis under both the existing and future-year traffic conditions with expected Project completion in 2028. The following traffic scenarios have been developed and analyzed as part of this study:
• Existing (Year 2025) Conditions – The existing conditions analysis includes 2025 traffic turning movement counts collected at study intersections.
• Future (Year 2028) Conditions – 2025 traffic turning movement counts grown to buildout year 2028 using an ambient growth rate of 1% per year, plus vehicle-trips generated by the proposed Project and related projects within one-half mile of the study intersections located furthest from the Project site.
Study Area and Intersections
The study area selected for analysis extends to Walnut Creek, forming the northern boundary of the project site and separating the adjacent neighborhood from the roadway network to the north.
Francisquito Avenue forms the eastern boundary, Puente Avenue forms the southern boundary, and Barrydale Street forms the western boundary of the study area.
As a result of consultation with the County, the analysis includes four side-street stop-controlled intersections, as shown in Figure 2. These intersections were selected for data collection and analysis because they provide access to the project site and are most likely to experience increases in travel demand from the proposed housing development. The four study intersections are located in unincorporated Los Angeles County and listed below:
• Le Borgne Avenue & Millbury Avenue (County)
• Le Borgne Avenue & Barrydale Street (County)
• Barrydale Street & Puente Avenue (County)
• Van Wig Avenue & Francisquito Avenue (County)
Figure 2
STUDY INTERSECTIONS AND LOCATION
Draft Transportation Impact Analysis | 5
VMT Analysis
On September 27, 2013, Governor Jerry Brown signed Senate Bill (SB) 743 into law and started a process that will fundamentally change transportation impact analysis conducted as part of California Environmental Quality Act (CEQA) compliance. The Governor’s Office of Planning and Research (OPR) was charged with developing new guidelines for evaluating transportation impacts under CEQA using methods that no longer focus on measuring automobile delay and level of service (LOS).
In July 2020, Los Angeles County adopted specific VMT methods and thresholds of significance for transportation studies. In addition, the County still requires a traffic operations analysis for nearby intersections to determine if improvements are required to accommodate additional travel demand generated by a new development.
Since the Project is located in Baldwin Park, the VMT analysis followed the City of Baldwin Park VMT requirements. The City has adopted the San Gabriel Valley Council of Governments Regional Model VMT baselines and thresholds of significance for purposes of analyzing a project’s transportation impacts under CEQA. The VMT analysis and associated findings are included in Appendix A of this report.
Draft Transportation Impact Analysis | 6
Existing Conditions
Data Collection
Traffic counts were collected at the study intersections during the AM peak period (7:00–9:00 AM) and PM peak period (4:00–6:00 PM) on May 20, 2025. Counts were collected while school was in session, and during a typical weekday (Tuesday, Wednesday, or Thursday). A site visit was also conducted to observe existing lane configurations and intersection operations.
Existing Roadway System
The project site is located in an established, residential area with the surrounding roadway network consisting primarily of residential streets providing connections to the regional transportation system. • Interstate 10 (I-10): A freeway that provides regional access to and from the study area, with on-and off-ramps located within approximately half a mile of the project site. I-10 serves as a major east–west freeway connecting Los Angeles to the Inland Empire and beyond. • Francisquito Avenue: A four-lane arterial located approximately one-half mile south of the project site. According to the Los Angeles County Master Plan of Highways, Puente Avenue is classified as a Major Highway. Puente Avenue provides local and regional connectivity between La Puente and Baldwin Park and serves as a primary route to I-10. • Puente Avenue: A four-lane arterial located approximately one-quarter mile east of the project site. Based on the Los Angeles County Master Plan of Highways, Francisquito Avenue is classified as a Secondary Highway. Francisquito Avenue connects the surrounding area to regional destinations and provides access to I-10.
• Barrydale Street: A two-lane residential street just south of the project site. It provides a north-south connection between Le Borgne Avenue and Puente Avenue, serving local traffic and neighborhood circulation. Barrydale Street is proposed as a Bicycle Boulevard in the Bicycle Master Plan (County of Los Angeles Public Works, March 2012). • Millbury Avenue: A two-lane residential street that connects Le Borgne Avenue and the project site to the surrounding neighborhood. It facilitates local circulation between Barrydale Street to Van Wig Avenue and serves as a local connector for school and residential traffic. • Van Wig Avenue: A two-lane minor collector southeast of the project site, connecting the project site and local neighborhood streets to Francisquito Avenue. • Le Borgne Avenue: A two-lane residential street that functions primarily as access to the existing school facility located on the project site and connects to Barrydale Street and Millbury Avenue.
The street primarily provides school access, accommodating pick-up/drop-off activity and parking.
Analysis Methodology
Methodologies and parameters used to complete the analysis for the traffic study are consistent with the methodologies described in the County’s TIA Guidelines as provided below.
Los Angeles County LOS Criteria
The study intersections are currently unsignalized with side-street stop-control. Methodologies consistent with the Highway Capacity Manual (HCM) 7th Edition (Transportation Research Board,
Draft Transportation Impact Analysis | 7
2017) were used to evaluate intersection operations. The HCM 7th Edition methodology for unsignalized intersections estimates the worst-case movement delay for side-street stop-controlled intersections. The LOS definitions for unsignalized intersections are presented in Table 1.
Table 1 – LOS Criteria for Unsignalized Intersections
LOS (v/c < 1.0) Description Average Control Delay
Per Vehicle (Seconds)
A Little or no delay. < 10.0
B Short traffic delay. > 10.0 to 15.0
C Average traffic delays. > 15.0 to 25.0
D Long traffic delays. > 25.0 to 35.0
E Very long traffic delays. > 35.0 to 50.0
F Extreme traffic delays with intersection's capacity
exceeded. > 50.0
Source: Highway Capacity Manual 7th Edition, Transportation Research Board, 2022.
Intersections operating at LOS D or better are considered acceptable. When an intersection is operating unacceptably, intersection improvements will be identified to achieve an acceptable LOS.
Los Angeles County Operational Deficiencies
The County’s TIA Guidelines state that project access is considered constrained if the project’s traffic would contribute to unacceptable queuing at nearby signalized intersections. The study intersections requested by the County for analysis are all unsignalized, and therefore, a queuing analysis is not required per the TIA Guidelines. However, a queueing analysis was conducted to determine if any vehicle queues exceeded the storage provided. Unacceptable queuing is defined as when the 95th percentile queue begins to spill over from the turn pockets into through lanes or into adjacent intersections.
Intersection Operational Analysis
This section presents existing peak hour traffic volumes and the results of the intersection operations analysis, indicating the levels of service, delay (in seconds), and vehicle queues.
Existing Traffic Volumes
The existing weekday morning and afternoon peak hour traffic volumes at the study intersections are provided in Figure 3. Traffic count sheets are contained in Appendix B.
FIGURE 3
EXISTING CONDITIONS
AM AND PM PEAK HOUR TRAFFIC VOLUMES
AND LANE CONFIGURATIONS 2 (0) 4 (7)6 (4)
14 (3)2 (0) 6 (12)
1. Millbury Ave/Le Borgne Ave* 11 (2)
19 (22)4 (1) 6 (1) 32 (4)
18 (24)
2. Le Borgne Ave/Barrydale St 1 (2) 35 (27) 837 (1,072) 6 (12) 5 (5)
4 (0)
45 (27) 18 (39) 936 (566) 54 (64) 15 (18) 97 (54)
5 (5)
2 (4)
3. Puente Ave/Barrydale St 30 (25) 0 (0) 70 (52)
1 (0)
714 (907)
45 (50) 1 (4) 0 (0) 1 (1)2 (0)
1,087 (736)
28 (44)
4. Van Wig Ave/Francisquito Ave** Le Borgne Ave Millbury Ave Barrydale St Puente Ave
Francisquito Ave Commercial Driveway Van Wig Ave Barrydale St Le Borgne Ave STOP STOP STOP
STOP
g
b
e
b g
e
d
ice
ice
d be
d
d be
Lane Configuration acf
AM (PM) Peak Hour Traffic Volume STOP Stop Sign
Signalized
Notes:
* The Le Borgne Avenue approach to
Intersection 1 is designed as a
drvieway. While a Stop Sign is not
installed at the driveway, vehicles on
Millbury Avenue have the right-of-way,
and therefore, the intersection was
analyzed as side-street-stop controlled.
** Two-way-left-turn lane on
Francisquito Ave is included in
Synchro model. STOP STOP STOP
Draft Transportation Impact Analysis | 9
Existing Conditions Level of Service
Existing (May 2025) vehicle turning movement counts were analyzed in Synchro Version 12 (v12) with HCM 7th Edition. Table 2 summarizes the results of the existing conditions analysis for weekday morning and afternoon peak hour delay and LOS at the study intersections. At Intersection 1, Le Borgne Avenue & Millbury Avenue, the Le Borgne Avenue approach is currently designed as a driveway. While a Stop Sign is not installed on the driveway portion of Le Bourge Avenue, vehicles on Millbury Avenue have the right-of-way; and therefore, the intersection was analyzed as side-street-stop controlled. As shown below, the four study intersections analyzed operate at LOS A based on overall vehicle delay during the AM and PM peak hours and the intersections of Barrydale Street & Puente Avenue and Van Wig Avenue & Francisquito Avenue have worst-case movements that operate at LOS E during the AM and PM peak hours. The Synchro v12 HCM 7th Edition detailed results are shown in Appendix C.
Table 2 – Existing Conditions LOS and Delay Results
# Intersection Traffic
Control
Report
Type
Peak
Hour
Overall
Intersection
Delay - LOS
Worst Movement
Delay - LOS
1 Le Borgne Avenue &
Millbury Avenue SSSC HCM 7th
AM 5.5 - A 8.6 - A (EB)
PM 2.3 - A 8.6 - A (EB)
2 Le Borgne Avenue &
Barrydale Street AWSC HCM 7th
AM 7.2 - A 7.4 – A (EB)
PM 7.0 - A 7.1 - A (EB)
3 Barrydale Street & Puente
Avenue SSSC HCM 7th
AM 2.8 - A 37.3 - E (EB)
PM 2.4 - A 36.6 - E (WB)
4 Van Wig Avenue &
Francisquito Avenue SSSC HCM 7th
AM 2.1 - A 38.2 – E (SB)
PM 2.1 - A 35.4 – E (NB)
For the study intersections that have a worst-case movement delay resulting in LOS E or worse, a traffic signal warrant analysis was conducted. The results are presented in the Future (Year 2028) Conditions section of this report.
Existing Conditions Queues
Table 3 summarizes the results of the queueing analysis conducted for the weekday AM and PM peak hours under existing (2025) conditions. Queue lengths were evaluated using the 95th percentile values from Synchro v12, with a standard storage length of 25 feet per vehicle.
Under existing conditions, all study intersections operate with minimal queuing. The majority of movements experience 95th percentile queues of fewer than two vehicles. The longest observed queues occur at Van Wig Avenue & Francisquito Avenue, with 95th percentile queues of 2.1 vehicles (55 feet) in the AM peak and 1.8 vehicles (45 feet) in the PM peak hour. These queues remain within available storage and do not result in operational issues. The full queueing analysis results are in Appendix C.
Draft Transportation Impact Analysis | 10
Table 3 – Existing Conditions Queue Lengths
# Intersection Movement
Available
Storage
(Ft)
AM PM
95th
Percentile
Queue
(Veh)
95th
Percentile
Queue
(ft)
95th
Percentile
Queue
(Veh)
95th
Percentile
Queue
(ft)
1 Le Borgne
Avenue &
Millbury
Avenue
EBL Le Borgne 120 < 1 < 25 < 1 < 25
EBR Le Borgne 120 < 1 < 25 < 1 < 25
NBL Millbury 250 < 1 < 25 < 1 < 25
NBT Millbury 250 N/A N/A
SBT Millbury 650 N/A N/A
SBR Millbury 650 N/A N/A
2 Le Borgne
Avenue &
Barrydale
Street
EBL Barrydale 170 < 1 < 25 < 1 < 25
EBT Barrydale 170 < 1 < 25 < 1 < 25
WBT Barrydale 170 < 1 < 25 < 1 < 25
WBR Barrydale 170 < 1 < 25 < 1 < 25
SBL Le Borgne 150 < 1 < 25 < 1 < 25
SBR Le Borgne 150 < 1 < 25 < 1 < 25
3 Barrydale
Street &
Puente
Avenue
EBL Barrydale 500 1.4 35 < 1 < 25
EBT Barrydale 500 1.4 35 < 1 < 25
EBR Barrydale 500 1.4 35 < 1 < 25
WBL Barrydale 500 1.6 40 1.7 45
WBT Barrydale 500 1.6 40 1.7 45
WBR Barrydale 500 1.6 40 1.7 45
NBL Puente 100 < 1 < 25 < 1 < 25
NBT Puente >500 N/A N/A
NBR Puente >500 N/A N/A
SBL Puente 100 < 1 < 25 < 1 < 25
SBT Puente >500 N/A N/A
SBR Puente >500 N/A N/A
4 Van Wig
Avenue &
Francisquito
Avenue
EBL Francisquito 350 < 1 < 25 < 1 < 25
EBT 350 N/A N/A
EBR 350 N/A N/A
WBL Francisquito 325 < 1 < 25 < 1 < 25
WBT Francisquito 500 N/A N/A
WBR Francisquito 500 N/A N/A
NBL Van Wig 110 2.1 55 1.8 45
NBT Van Wig 110 2.1 55 1.8 45
NBR Van Wig 110 2.1 55 1.8 45
Note: N/A is noted when no queues were reported.
Draft Transportation Impact Analysis | 11
Project Conditions
The development of project-related traffic operations for the proposed Project involves the use of a 3-step process: trip generation, trip distribution, and trip assignment.
Project Trip Generation
The analysis estimated the number of daily trips associated with the Project using trip generation rates from the Institute of Transportation Engineers’ (ITE) Trip Generation Manual, 11th Edition (“TripGen11”). The Project meets the ITE definitions for Land Use 220—Multifamily Housing (Low-Rise) Not Close to Rail Transit, in a General Urban/Suburban setting. The corresponding sub-categories were used accordingly for the trip generation analysis. Table 4 presents the estimated vehicle trip generation of the Project during a weekday. The Project is estimated to generate a total of 702 daily vehicle trips, with 42 vehicle trips occurring in the AM peak hour and 53 vehicle trips occurring in the PM peak hour.
Table 4 – Project Vehicle Trip Generation Estimates - Weekday Variables
Daily AM Peak PM Peak
In Out Total In Out Total In Out Total
Trip generation
rate (per dwelling
unit)
- - 6.74 - - 0.40 - - 0.51
Directional
distribution 50% 50% - 24% 76% - 63% 37% -
Estimated vehicle
trips 351 351 702 10 32 42 33 20 53
Source: ITE Trip Generation Manual, 11th Edition, 2021.
Note: As a residential project, the Project was not eligible for internal capture trip credits.
Draft Transportation Impact Analysis | 12
Project Traffic Distribution
Project trip distribution refers to the directions of approach and departure that vehicles would use to travel to and from the Project site. The surrounding land uses, existing roadway network characteristics, local knowledge of the study area, and professional judgement were used to estimate the trip distribution. Regional access to the project site will be provided by the I-10 freeway, with access provided at Puente Avenue and Francisquito Avenue. Given that Walnut Creek forms the northern boundary of the project site and separates the adjacent neighborhood from the roadway network to the north, project trips will enter/exit the site utilizing the roadway network to the south, east, and west, as illustrated in Figure 4.
2 Based on travel patterns in the study area as observed through existing turning movement volumes at the study intersections, approximately 60% of vehicle-trips are expected to travel to/from the east and 40% are expected to travel to/from the west when entering/exiting the neighborhood.
Project Traffic Assignment
The traffic generated by the proposed Project was assigned to the street network using the distribution patterns shown in Figure 4. Figure 5 provides the assignment of the proposed Project-generated peak hour traffic volumes at the analyzed intersections during the AM and PM peak hours. 2 Attachment B in the Final Scoping Memorandum (August 20, 2025) shows the trip distribution by individual turning movements. In some cases, the percentages shown for each turning movement in Attachment B vary slightly from the daily trip distribution shown in Figure 4 because peak hour volumes are rounded to the nearest vehicle trip.
Figure 4
PROJECT TRIP DISTRIBUTION
FIGURE 5
PROJECT ONLY
AM AND PM PEAK HOUR TRAFFIC VOLUMES
AND LANE CONFIGURATIONS 4 (12) 0 (0)14 (9)
6 (4)5 (17) 0 (0)
1. Millbury Ave/Le Borgne Ave* 1 (5)
0 (0)5 (3) 7 (4) 0 (0)
0 (0)
2. Le Borgne Ave/Barrydale St 3 (8) 0 (0) 0 (0)
4 (2)
0 (0)
8 (5)
0 (0) 0 (0)0 (0)
0 (0)
0 (0)
3. Puente Ave/Barrydale St 5 (3) 0 (0) 10 (7)
0 (0)
0 (0)
1 (5) 0 (0) 0 (0) 0 (0)0 (0)
0 (0)
4 (12)
4. Van Wig Ave/Francisquito Ave** Le Borgne Ave Millbury Ave Barrydale St Puente Ave
Francisquito Ave Commercial Driveway Van Wig Ave Barrydale St Le Borgne Ave STOP STOP STOP
STOP
g
b
e
b g
e
d
ace
ace
d be
d
d be
Lane Configuration acf
AM (PM) Peak Hour Traffic Volume STOP Stop Sign
Signalized STOP STOP STOP 1 (3)
Notes:
* The Le Borgne Avenue approach to
Intersection 1 is designed as a
driveway and the driveway apron will
remain in place with the Project.
Similar to existing conditions, vehicles
on Millbury Avenue will have the
right-of-way, and therefore, the
intersection will continue to operate
as side-street-stop controlled. As
requested by the County, a stop sign
will be installed on the Le Borgne
Avenue approach to the intersection.
** Two-way-left-turn lane on
Francisquito Ave is included in
Synchro model.STOP
Draft Transportation Impact Analysis | 15
Future Year (2028) Plus
Project Conditions
To evaluate the potential effects of the proposed Project on future conditions, future traffic forecasts were developed for the study intersections. The forecasts included traffic volume growth from regional background traffic and traffic generated by new developments within the vicinity of the study area (related projects). The traffic generated by the proposed Project was then estimated and assigned to the surrounding street system.
Ambient Growth Rate
An ambient growth rate of 1% per year was applied to the existing conditions traffic volumes, to reflect the effects of regional growth and development by the Year 2028. 3 An ambient growth rate
represents a general growth in traffic volumes due to regional growth and development outside the study area.
Related Projects
Future (2028) Conditions traffic forecasts include the effects of known development projects, also known as “Related Projects.” These are pending and approved developments within one-half mile from the farthest outlying study intersection, that are expected to be completed by the buildout horizon (2028). Based on a review of Related Projects within the City of Baldwin Park and Los Angeles County, no projects were identified within one-half mile from the farthest outlying study intersection.
Future Year (2028) Conditions Traffic Conditions
The Future Base traffic conditions represent an estimate of future conditions, inclusive of the ambient background growth, but without the proposed Project. Future Year Plus Project conditions represent a combination of Future Base conditions, adding in forecasts for the Project. Future Year Plus Project (Future Plus Project) weekday AM and PM peak hour traffic volumes and lane geometries for the study intersections are included in Figure 6.
The results of the Future Plus Project analysis are presented in Table 5 with analysis sheets provided in Appendix C. With the Project, Intersection 1, Le Borgne Avenue & Millbury Avenue, would continue to operate as it does under existing conditions with a driveway apron on Le Borgne Avenue and free flow on Millbury Avenue. As requested by Los Angeles County Public Works, a stop sign will be installed on the Le Borgne Avenue approach to the intersection to formalize the side-street stop control operations. All study intersections analyzed are projected to operate at LOS A based on the overall average vehicle delay during the AM and the PM peak hours. The intersection of Barrydale Street & Puente Avenue would have a worst-case movement of LOS F during the AM peak hour and LOS E during the PM peak hour, and the Van Wig Avenue & Francisquito Avenue intersection would have a worst-case movement of LOS E during the AM and PM peak hours. 3 Ambient growth rate was applied by using the exponential growth formula: (base volume) * (1 + r/100)t where r is equal to the ambient growth rate, and t is equal to the change over time in number of years.
FIGURE 6
FUTURE PLUS PROJECT (2028)
AM AND PM PEAK HOUR TRAFFIC VOLUMES
AND LANE CONFIGURATIONS 6 (12) 4 (7)21 (13)
21 (7)7 (17) 6 (12)
1. Millbury Ave/Le Borgne Ave* 12 (7)
20 (23)9 (4) 13 (5) 33 (4)
19 (25)
2. Le Borgne Ave/Barrydale St 1 (2) 39 (36) 862 (1,104) 6 (12) 9 (7)
4 (0)
55 (33) 19 (40) 965 (586) 56 (66) 15 (19) 100 (56)
5 (5)
2 (4)
3. Puente Ave/Barrydale St 36 (29) 0 (0) 82 (61)
1 (0)
736 (934)
47 (57) 1 (4) 0 (0) 1 (1)2 (0)
1,120 (758)
33 (58)
4. Van Wig Ave/Francisquito Ave** Le Borgne Ave Millbury Ave Barrydale St Puente Ave
Francisquito Ave Commercial Driveway Van Wig Ave Barrydale St Le Borgne Ave STOP STOP STOP STOP
STOP
g
b
e
b g
e
d
ice
ice
d be
d
d be
Lane Configuration acf
AM (PM) Peak Hour Traffic Volume STOP Stop Sign
Signalized STOP STOP
Notes:
* The Le Borgne Avenue approach to
Intersection 1 is designed as a
driveway and the driveway apron will
remain in place with the Project.
Similar to existing conditions, vehicles
on Millbury Avenue will have the
right-of-way, and therefore, the
intersection will continue to operate
as side-street-stop controlled. As
requested by the County, a stop sign
will be installed on the Le Borgne
Avenue approach to the intersection.
** Two-way-left-turn lane on
Francisquito Ave is included in
Synchro model.STOP
Draft Transportation Impact Analysis | 17
Table 5 – Future (2028) Plus Project LOS and Delay Results # Intersection Traffic
Control
Report
Type
Peak
Hour
Overall
Intersection
Delay - LOS
Worst Movement
Delay - LOS
1 Le Borgne Avenue & Millbury
Avenue SSSC HCM 7th
AM 6.4 - A 8.8 – A (EB)
PM 3.9 - A 9.0 - A (EB)
2 Le Borgne Avenue &
Barrydale Street AWSC HCM 7th
AM 7.3 - A 7.5 - A (EB)
PM 7.1 - A 7.2 – A (EB)
3 Barrydale Street & Puente
Avenue SSSC HCM 7th
AM 3.8 - A 58.7 - F (EB)
PM 2.9 - A 42.9 - E (WB)
4 Van Wig Avenue &
Francisquito Avenue SSSC HCM 7th
AM 3.0 - A 42.9 - E (NB)
PM 3.1 - A 48.9 – E (NB)
For the study intersections that have a worst-case movement delay resulting in LOS E or worse, a traffic signal warrant analysis was conducted. The results are presented following the queueing analysis below.
Future Plus Project Queues
Table 6 summarizes the results of the queueing analysis of the Future Plus Project weekday AM and PM peak hours. Queue lengths were evaluated using the 95th percentile, with a standard assumption of 25 feet of storage per vehicle.
Under Future Plus Project conditions, all study intersections are projected to operate with minimal queuing. At most locations, 95th percentile queues are less than three vehicles in length, and no movements are expected to experience queues that exceed available storage. The highest projected queue occurs at the Van Wig Avenue approach to the Van Wig Avenue & Francisquito Avenue intersection during the AM peak hour, with an estimated 95th percentile queue of approximately 3.2 vehicles (80 feet) and available storage of 110 feet.
Overall, queueing conditions remain well within capacity across the study area and are not expected to result in operational constraints due to the addition of Project traffic.
Draft Transportation Impact Analysis | 18
Table 6 – Future (2028) Plus Project Queues
# Intersection Movement Available
Storage
AM PM Change
in
Storage
with
Project
(ft)
95th
Percentile
Queue
(Veh)
95th
Percentile
Queue
(ft)
95th
Percentile
Queue
(Veh)
95th
Percentile
Queue
(ft)
1 Le Borgne
Avenue &
Millbury
Avenue
EBL Le Borgne 120 < 1 < 25 < 1 < 25 0
EBR Le Borgne 120 < 1 < 25 < 1 < 25 0
NBL Millbury 250 < 1 < 25 < 1 < 25 0
NBT Millbury 250 N/A N/A 0
SBT Millbury 650 N/A N/A 0
SBR Millbury 650 N/A N/A 0
2 Le Borgne
Avenue &
Barrydale
Street
EBL Barrydale 170 < 1 < 25 < 1 < 25 0
EBT Barrydale 170 < 1 < 25 < 1 < 25 0
WBT Barrydale 170 < 1 < 25 < 1 < 25 0
WBR Barrydale 170 < 1 < 25 < 1 < 25 0
SBL Le Borgne 150 < 1 < 25 < 1 < 25 0
SBR Le Borgne 150 < 1 < 25 < 1 < 25 0
3 Barrydale
Street &
Puente
Avenue
EBL Barrydale 500 2.6 65 < 1 < 25 0
EBT Barrydale 500 2.6 65 < 1 < 25 0
EBR Barrydale 500 2.6 65 < 1 < 25 0
WBL Barrydale 500 1.8 45 2.0 50 0
WBT Barrydale 500 1.8 45 2.0 50 0
WBR Barrydale 500 1.8 45 2.0 50 0
NBL Puente 100 < 1 < 25 < 1 < 25 0
NBT Puente >500 N/A N/A 0
NBR Puente >500 N/A N/A 0
SBL Puente 100 < 1 < 25 < 1 < 25 0
SBT Puente >500 N/A N/A 0
SBR Puente >500 N/A N/A 0
4 Van Wig
Avenue &
Francisquito
Avenue
EBL Francisquito 350 < 1 < 25 < 1 < 25 0
EBT 350 N/A N/A 0
EBR 350 N/A N/A 0
WBL Francisquito 325 < 1 < 25 < 1 < 25 0
WBT Francisquito 500 N/A N/A 0
WBR Francisquito 500 N/A N/A 0
NBL Van Wig 110 3.2 80 2.8 70 0
NBT Van Wig 110 3.2 80 2.8 70 0
NBR Van Wig 110 3.2 80 2.8 70 0
Note: N/A is noted when no queues were reported.
Draft Transportation Impact Analysis | 19
Traffic Signal Warrant Analysis
A traffic signal warrant analysis was completed for the Barrydale Street & Puente Avenue and Van Wig Avenue & Francisquito Avenue study intersections per guidelines set forth in the California Manual on Uniform Traffic Control Devices4 (CA MUTCD). In addition to the May 2025 traffic count data utilized for the warrant analysis, additional traffic count data was collected in March 2026 to record midday traffic volumes and pedestrian crossings at both locations.
CA MUTCD Warrants and Guidance
To conduct the signal warrant analyses, CA MUTCD has nine signal warrants that should be considered. The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal. A brief overview of each signal warrant is provided below and the findings are presented in the next section.
• Warrant 1, Eight Hour Vehicular Volume determines if the major and minor street traffic volumes are high enough and consistent enough throughout the day to meet the minimum thresholds to consider a traffic signal. Since daily traffic volumes were not available, this warrant was not considered.
• Warrant 2, Four Hour Vehicular Volume determines if the major and minor street traffic volumes are high enough over a shorter period to meet the minimum thresholds to consider a traffic signal.
• Warrant 3, Peak Hour should be applied only in unusual cases where proximate land uses attract or discharge large numbers of vehicles over a short time. This warrant determines if the delay of the minor street and the traffic volumes are high enough for the peak hour to meet the minimum thresholds to consider a traffic signal. • Warrant 4, Pedestrian Volume determines if major street volumes and pedestrian presence are high enough that pedestrians may experience excessive delay in crossing the street to meet minimum thresholds to consider a traffic signal.
• Warrant 5, School Crossing determines if major street volumes and schoolchildren crossing counts are high enough to meet the minimum thresholds to consider a traffic signal. • Warrant 6, Coordinated Signal System evaluates the surrounding coordinated signal system (if one is present) to determine whether a traffic signal would support maintaining proper vehicular platooning.
• Warrant 7, Crash Experience determines if the one-year crash history at the intersection meets the minimum threshold to consider a traffic signal. • Warrant 8, Roadway Network evaluates the intersection roadways’ significance to the larger surrounding roadway network, determining the need for a signal to increase coordination and organization of traffic in the network.
• Warrant 9, Intersection Near a Grade Crossing evaluates whether a stop or yield-controlled grade crossing may require a traffic signal.
4 The California Manual on Uniform Traffic Control Devices (CA MUTCD) is published by the California Department of Transportation (Caltrans). The latest edition of the 2014 CA MUTCD was effective on April 1, 2025, and is referred to as Revision 9. The CA MUTCD provides uniform standards and specifications for all official traffic control devices in California.
Draft Transportation Impact Analysis | 20
The signal warrant analysis worksheets, additional traffic count data collection, and collision data are contained in Appendix D.
Signal Warrant Analysis
Per the CA MUTCD, signal warrant analyses were completed for the study intersections at Barrydale Street & Puente Avenue and Van Wig Avenue & Francisquito Avenue under Existing and Future Plus Project conditions.
At Barrydale Street & Puente Avenue, Puente Avenue is the major roadway and Barrydale Street is the minor roadway. Puente Avenue has approaches with two through lanes and a left-turn lane in each direction. Barrydale street has approaches with one shared left/through/right-turn lane in each direction. The intersection is a four-leg intersection. No geometric or operational changes are proposed at this intersection with the Project.
At Van Wig Avenue & Francisquito Avenue, Francisquito Avenue is the major roadway and Van Wig Avenue is the minor roadway. Francisquito Avenue has approaches with two travel lanes in each direction and a center turn lane. Van Wig Avenue has an approach with one lane in each direction.
The two roadways form a three-leg intersection with a low volume driveway that forms the fourth approach. No geometric or operational changes are proposed at this intersection with the Project.
The results of each warrant analysis are displayed in Table 7 and Table 8 and described in detail below. As shown, the Barrydale Street & Puente Avenue intersection only meets the peak hour signal warrant under both Existing and Future Plus Project conditions. The Van Wig Avenue & Francisquito Avenue intersection meets the four hour vehicular volume warrant and the peak hour warrant under both Existing and Future Plus Project conditions. The remaining warrants are not met at either intersection under Existing or Future Plus Project conditions. The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Table 7: Signal Warrant Analysis Summary – Barrydale Street & Puente Avenue
WARRANT
SATISFIED
Existing
Conditions
Plus Project
Conditions
Warrant 2 – Four Hour Vehicular Volume No No
Warrant 3 – Peak Hour Yes Yes
Warrant 4 – Pedestrian Volume No No
Warrant 5 – School Crossing No No
Warrant 6 – Coordinated Signal System No No
Warrant 7 – Crash Experience Warrant No No
Warrant 8 – Roadway Network No No
Warrant 9 – Intersection Near Grade Crossing No No
Draft Transportation Impact Analysis | 21
Table 8: Signal Warrant Analysis Summary – Van Wig Avenue & Francisquito Avenue
WARRANT
SATISFIED
Existing
Conditions
Plus Project
Conditions
Warrant 2 – Four Hour Vehicular Volume Yes Yes
Warrant 3 – Peak Hour Yes Yes
Warrant 4 – Pedestrian Volume No No
Warrant 5 – School Crossing No No
Warrant 6 – Coordinated Signal System No No
Warrant 7 – Crash Experience Warrant No No
Warrant 8 – Roadway Network No No
Warrant 9 – Intersection Near Grade Crossing No No
Warrant 2, Four-Hour Vehicular Volume
At Barrydale Street & Puente Avenue, the traffic volumes on the side-street approach do not meet the minimum volume threshold required by the four hour vehicular volume warrant. The Project does not add any vehicles to the westbound Barrydale Street approach to the intersection which is the highest volume minor street approach. Therefore, this warrant is not met under Existing or Future Plus Project conditions.
At Van Wig Avenue & Francisquito Avenue, the traffic volumes on the side-street approach meet the 100% minimum volume threshold required by the four hour vehicular volume warrant under Existing conditions; and therefore, the warrant is also met under Future Plus Project conditions.
Warrant 3, Peak Hour
Per CA MUTCD guidance, Warrant 3 “shall only be applied in unusual cases, such as office complexes, manufacturing plants, industrial complexes, or high-occupancy vehicle facilities that attract or discharge large numbers of vehicles over a short time.” Therefore, Warrant 3 is not directly applicable for this intersection but was included as additional information for the County’s consideration.
At Barrydale Street & Puente Avenue, the peak hour volumes that occur in the AM peak hour when the side-street approach volumes are highest meet the peak hour signal warrant under Existing conditions and would continue to meet it with the Project. However, the amount of delay experienced by vehicles on northbound Barrydale Street does not exceed the delay threshold for the warrant under Existing or Future Plus Project conditions. Nevertheless, the peak hour warrant only requires one of these conditions to be met. Therefore, the peak hour warrant is met at this intersection under both Existing and Future Plus Project conditions.
At Van Wig Avenue & Francisquito Avenue, the peak hour volumes that occur in the AM peak hour when the side-street approach volumes are highest meet the peak hour signal warrant under Existing conditions and would continue to meet it with the Project. However, the amount of delay experienced by vehicles on northbound Van Wig Avenue does not exceed the delay threshold for the
Draft Transportation Impact Analysis | 22
warrant under Existing or Future Plus Project conditions. Nevertheless, the peak hour warrant only requires one of these conditions to be met. Therefore, the peak hour warrant is met at this intersection under Existing and Future Plus Project conditions.
Warrant 4, Pedestrian Volume
Minimal pedestrian volumes were observed at both intersections based on counts collected from 12:00 PM to 4:00 PM. The minimum pedestrian volume required to satisfy this signal warrant is 107 pedestrians per hour.
During the four hour period at Barrydale Street & Puente Avenue, 14 total pedestrians walked through the intersection with only four pedestrians crossing Puente Avenue. At Van Wig Avenue & Francisquito Avenue, 29 total pedestrians walked through the intersection during the four hour data collection period with only one pedestrians crossing Francisquito Avenue. Both intersections have pedestrian volumes far below that required to meet the pedestrian volume warrant; and therefore, the warrant is not met.
Warrant 5, School Crossing
Per CA MUTCD guidance, Warrant 5 “is intended for application where the fact that schoolchildren cross the major street is the principal reason to consider installing a traffic control signal.” The minimum volume required to satisfy this signal warrant is 20 schoolchildren crossing the major street during the highest crossing hour. Given the low pedestrian volumes observed at both locations as summarized under Warrant 4, neither intersection is being used as a primary school crossing and this warrant is not met.
Warrant 6, Coordinated Signal System
This warrant applies along roadways that have adjacent traffic signals that are part of a coordinated system, and a new signal would assist in maintaining proper platooning and progressive vehicle movement. Since these conditions do not exist at either study location, the warrant is not met.
Warrant 7, Crash Experience:
Transportation Injury Mapping System (TIMS) crash data from January 1, 2022 to December 31, 2024 was used to inform this warrant analysis. To satisfy this warrant, a minimum of five collisions within a 12-month period that are susceptible to correction by a traffic signal need to have occurred at the intersection. At Barrydale Street & Puente Avenue, three collisions occurred between October 2023 and November 2024. At the Van Wig Avenue & Francisquito Avenue intersection, no collisions occurred during this period. Therefore, this warrant is not met.
Warrant 8, Roadway Network:
The intersections do not satisfy Warrant 8 because they do not consist of two or more major routes.
Each intersection has one roadway serving as a major route, Puente Avenue and Francisquito Avenue, with intersecting roadways serving as residential roadways, Barrydale Street and Van Wig Avenue.
Therefore, this warrant is not met.
Warrant 9, Intersection Near a Grade Crossing:
These intersections do not satisfy Warrant 9 because they are not near a grade crossing.
Draft Transportation Impact Analysis | 23
Proposed Traffic Signal
Based on the findings of the signal warrant analysis and discussions with City of Baldwin Park Public Works, the Project applicant will install a traffic signal at the Barrydale Street & Puente Avenue intersection. While the Van Wig Avenue & Francisquito Avenue intersection meets two of the eight warrants under both Existing and Future Plus Project conditions, installing a traffic signal has the potential to disrupt traffic flows on Francisquito Avenue. The installation of a traffic signal at the Barrydale Street & Puente Avenue intersection will improve access for the neighborhoods on both the northwest and southeast sides of Puente Avenue and provide a protected pedestrian crossing. As requested by the City of Baldwin Park, the Project applicant will conduct the following:
• The Applicant shall design and install a new complete traffic signal at the intersection of Barrydale Street & Puente Avenue.
Site Plan Review
As shown in Figure 1, access to the project site will be provided by two driveways and an internal roadway network will provide access to the new multi-family residential units. The operations of the two driveways are as follows:
• Driveway A: This driveway is located at the southern edge of the project site and will provide inbound and outbound access for vehicles entering/exiting the site. Driveway A connects to Le Borgne Avenue which provides access to Millbury Avenue. The Le Borgne Avenue and Millbury Avenue intersection is expected to operate at LOS A with the addition of project-generated vehicles. Driveway A is located on the outside of the horizontal curve on Le Borgne Avenue which provides adequate site distance for vehicles entering and exiting the project site. • Driveway B: This driveway is located at the northern edge of the project site and will provide access only for vehicles exiting the project site. The majority of vehicles exiting the project site at Driveway B will utilize the Le Borgne Avenue and Barrydale Street intersection to travel towards the west on Barrydale Avenue or towards the southeast to exit the neighborhood at the Barrydale Street and Puente Avenue intersection. The Le Borgne Avenue and Barrydale Street intersection is expected to operate at LOS A with the addition of project-generated vehicles.
Site Access Study Screenings
The Project was also assessed for the following additional site access studies included in the County’s TIA Guidelines, Sections 4.2-4.4. The screening results for these studies are described in the following sections.
Draft Transportation Impact Analysis | 24
Construction Phase Analysis
The Project would not require construction activities to take place within the right-of-way of a County road, and the Project would not require the closure of any lanes, alleys, or streets in the County. Additionally, the construction would not result in the loss of any vehicle, bicycle, pedestrian, or transit access, and would not impact accessibility of these modes in the adjoining areas.
Construction activity would not result in the loss of any ADA access to existing transit stations, stops, or facilities, and would not restrict access to a bus stop or require the rerouting of a bus route. Since the construction activities for the Project meet all the screening requirements, a construction phase analysis is not required.
Local Residential Street Cut-Through Analysis
Based on the County’s TIA Guidelines, cut-through trips are defined as trips along a street classified as a local street in the County’s General Plan as an alternative to trips along a highway designated as Secondary, Major, etc., for purposes of accessing a destination that is not within the neighborhood.
The Project site is located within a residential neighborhood and will generate additional residential vehicle trips. While the Project’s residential trips will utilize the adjacent local streets to travel to/from the site, these trips do not meet the definition of cut-through trips because the vehicles are traveling to a destination within the neighborhood, and other Secondary or Major roadways are not available to access the Project site. Therefore, the Project does not require a local residential street cut-through analysis. In addition, the Project does not involve a discretionary action that would be reviewed by the Department of Regional Planning, and therefore, does not meet the screening criteria for requiring a local residential cut-through analysis.
Traffic Access Management, On-Site Traffic Queuing, and Event Management The Project would not provide a driveway on a rural two-lane highway, and therefore, does not require a traffic access management study. Two driveways will provide access to the Project site and on-site queueing will not occur on County roadways, and therefore, does not require an on-site traffic queuing analysis. Finally, the Project would not include any intermittent events that would exceed the supply of on-site parking, and therefore, does not require an event management plan.
Based on the County’s TIA Guidelines, the Project does not require a traffic access management study, an on-site traffic queuing analysis, or an event management plan.
Draft Transportation Impact Analysis | 25
Summary and Conclusions
This study was undertaken to analyze the potential transportation impacts of the proposed Le Borgne Residential Project. The following summarizes the results of this analysis:
• The Project proposes 104 multi-family residential units on a 5.26-acre site located south of Walnut Creek and north of Le Borgne Avenue in Baldwin Park. The Project includes a mix of attached units with 208 garage parking spaces and 31 on-street spaces, totaling 239 parking spaces.
• The Project is projected to generate 702 daily vehicle trips, including 42 trips (10 inbound / 32 outbound) during the AM peak hour and 53 trips (33 inbound / 20 outbound) during the PM peak hour.
• Intersection operations were evaluated using Synchro v12 with HCM 7th Edition methodology, consistent with the County’s TIA Guidelines (July 2020). When considering overall intersection operations, all study intersections are projected to operate at acceptable levels of service (LOS A) during both the AM and PM peak hours under Existing and Future Plus Project conditions. For intersections with worst-case movements operating at LOS E or worse, a traffic signal warrant analysis was conducted. The intersections of Barrydale Street & Puente Avenue and Van Wig Avenue & Francisquito Avenue have worst-case movements that operate at LOS E during the AM and PM peak hours under Existing conditions. Under Future Plus Project conditions, the intersection of Barrydale Street & Puente Avenue would have a worst-case movement of LOS F during the AM peak hour and LOS E during the PM peak hour, and the Van Wig Avenue & Francisquito Avenue intersection would continue to have a worst-case movement of LOS E during the AM and PM peak hours.
• A queuing analysis was conducted for all four study intersections. No movements are projected to experience queuing that would result in operational deficiencies. At most locations, 95th percentile queues are less than three vehicles in length, and no movements are expected to experience queues that exceed available storage.
• A traffic signal warrant analysis was completed for the Barrydale Street & Puente Avenue and Van Wig Avenue & Francisquito Avenue study intersections per guidelines set forth in the CA MUTCD and eight signal warrants were considered. The Barrydale Street & Puente Avenue intersection meets one of the eight warrants analyzed, the peak hour signal warrant, under both Existing and Future Plus Project conditions. The Van Wig Avenue & Francisquito Avenue intersection meets two of the eight warrants, the four hour vehicular volume warrant and the peak hour warrant, under both Existing and Future Plus Project conditions. • Based on the findings of the signal warrant analysis and discussions with City of Baldwin Park Public Works, the Project applicant will conduct the following: The Applicant shall design and install a new complete traffic signal at the intersection of Barrydale Street & Puente Avenue.
P
Appendix A - VMT Analysis and Findings
600 Wilshire Boulevard | Suite 1050 | Los Angeles, CA 90017 | (213) 261-3050 | Fax (310) 394-7663 www.fehrandpeers.com
Memorandum
Date: May 6, 2025
To: Storm Bird, Storm Properties, Inc.
From: Sarah Brandenberg and Gavin Derleth, Fehr & Peers Subject: VMT Assessment for 1314 Le Borgne Avenue Project LA25-3620
This technical memorandum documents a vehicle miles traveled (VMT) assessment conducted by Fehr & Peers for the proposed housing development at 1314 Le Borgne Avenue in Baldwin Park, California (“Project”). The VMT assessment completed for the Project is based on the guidance for assessing transportation impacts provided by the City of Baldwin Park (“City”) in the Transportation Impact Assessment (TIA) Guidelines for Vehicle Miles Traveled and Level of Service Assessment (“TIA Guidelines”) (November 2024). This memorandum provides a trip generation estimate for the Project and describes the results of the VMT assessment.
Project Description
The Project site is located on a 5.26-acre parcel south of Walnut Creek and north of Le Borgne Avenue, shown on the site plan in Attachment A. The Project will redevelop a former school site and entitle 104 multi-family dwelling units in the City of Baldwin Park. The Project would provide 239 parking spaces, with 208 spaces in two-car garages attached to the proposed dwelling units and 31 on-street parking spaces. The project site is located at the southern edge of Baldwin Park, adjacent to unincorporated Los Angeles County. Therefore, County roads will provide primary access from Le Borgne Avenue just north of Millbury Avenue.
Trip Generation
Trip generation rates for Multifamily Housing (Low-Rise), Land Use 220, in the Institute of Transportation Engineers’ (ITE) Trip Generation Manual 11th Edition (“TripGen11”) were used to estimate the number of daily trips associated with the Project. The Project meets the ITE definitions for Multifamily Housing (Low-Rise) that is Not Close to Rail Transit and located in a General Urban/Suburban setting, so these sub-categories were used to estimate trip generation. Table 1 presents the estimated vehicle trip generation of the Project during a weekday. The Project is
Storm Properties, Inc.
May 6, 2025
estimated to generate a total of 701 daily vehicle trips, with 42 vehicle trips occurring in the AM peak hour and 53 vehicle trips occurring in the PM peak hour.
Table 1: Project Vehicle Trip Generation Estimates - Weekday Variables Daily AM Peak PM Peak
In Out Total In Out Total In Out Total
Trip generation rate
(per dwelling unit) - - 6.74 - - 0.40 - - 0.51
Directional
distribution 50% 50% - 24% 76% - 63% 37% -
Estimated vehicle
trips 351 350 701 10 32 42 33 20 53
Source: ITE Trip Generation Manual, 11th Edition, 2021.
Note: As a residential project, the Project was not eligible for internal capture trip credits.
VMT Assessment
The following sections describe relevant considerations for conducting a California Environmental Quality Act (CEQA) Transportation Impact Analysis, including an initial screening of the Project to conclude whether a determination of less than significant VMT impact can be readily made, or if a more extensive evaluation of VMT-related transportation impacts is necessary to determine the potential for significant VMT-related transportation impacts.
Regulatory Context
On September 27, 2013, Governor Jerry Brown signed SB 743 into law, which initiated a process to change transportation impact analyses completed in support of CEQA documentation. SB 743 eliminates the vehicular level of service (LOS) as a basis for determining significant transportation impacts under CEQA and provides a new performance metric, VMT. As a result, the State has shifted from measuring a project’s impact to drivers (LOS) to measuring the impact of driving (VMT) as it relates to achieving State goals of reducing greenhouse gas (GHG) emissions, encouraging infill development, and improving public health by promoting active transportation. To help lead agencies with SB 743 implementation, the Governor’s Office of Planning and Research (OPR) produced a Technical Advisory (Technical Advisory on Evaluating Transportation Impacts in CEQA, 2018), and Baldwin Park updated its current TIA Guidelines in November 2024.
SGVCOG VMT Screening Tool and Results
The Baldwin Park TIA Guidelines instruct applicants to use the SGVCOG VMT Screening Tool (“Screening Tool”) to determine if a proposed project would have a significant VMT impact. The TIA Guidelines include criteria for screening projects from conducting a CEQA Transportation Impact Analysis based on project type or location within Transit Priority Areas (TPAs) or low VMT areas. If
Storm Properties, Inc.
May 6, 2025
the VMT Screening Tool indicates that a project meets any of the three screening criteria described in the transportation impact thresholds, further analysis is not required, and a less-than-significant determination can be made. The following sections outline the inputs, parameters, and results of the Screening Tool.
VMT Screening Tool Inputs and VMT Reduction Factors
The SGVCOG VMT Screening Tool requires applicants to select their project’s city, parcel number, land use type, VMT metric, and baseline year to conduct an initial VMT screening for the project.
Applicants also have the option to select additional VMT Reduction Factors relevant to their project land uses and site characteristics. The 1314 Le Borgne Avenue Project proposes a significant increase in residential density compared to current single family parcels in the surrounding neighborhood. The higher density of the Project would provide 19.8 dwelling units per acre. VMT Reduction Factor T-01, Increase Residential Density, in the Screening Tool accounts for VMT reductions associated with high density residential projects. Therefore, the proposed number of multi-family residential units (104 units) and the density (19.8 units per acre) were applied to the Screening Tool to determine the VMT of the proposed Project.
Transportation Priority Area Results
If the project is located within a one-half-mile radius of a major transit stop or high-quality transit corridor and meets all four criteria listed below, further analysis is not required, and a less-than-significant determination can be made. • The project has a Floor Area Ratio (FAR) of at least 0.75. • The project does not provide more parking than required by the City. • The project is consistent with the SCAG RTP/SCS.
• The project does not replace affordable residential units with a smaller number of moderate- or high-income residential units.
The Screening Tool indicated that the Project is located within a TPA. However, the Project does not have a FAR of at least 0.75 and provides five more parking spaces than the City code requires.
As such, the Project does not meet the TPA screening requirement.
VMT Screening Results
Based on the City’s TIA Guidelines, residential projects that generate VMT that is 15% below the Baseline VMT metrics would have a less-than-significant impact. The results from the Screening Tool, shown in Table 2, indicate that the Project would have a less-than-significant VMT impact for both Home-Based VMT per Capita and Total VMT per Service Population. To meet the City’s thresholds, the VMT with the Project must generate fewer than 18.59 Home-Based VMT per Capita and 26.64 Total VMT per Service Population. The Screening Tool calculated the VMT with the Project’s residential units and density significantly below these thresholds, with 15.22 Home-Based
Storm Properties, Inc.
May 6, 2025
VMT per Capita and 19.75 Total VMT per Service Population. Therefore, the Project would not have a significant impact on VMT, and mitigation measures are not required. The full output of the VMT Screening Tool is shown in Attachment B.
Table 2: Project VMT Results
VMT Metric VMT Baseline (2025) VMT Threshold VMT with Project1 Home-Based VMT
per Capita 21.87 18.59 15.22
Total VMT per
Service Population 31.17 26.64 19.75
Source: SGVCOG Screening Tool.
1. Includes VMT Reduction Measure T-01 for projects that increase residential density.
Conclusion
The proposed Project is expected to generate approximately 700 daily vehicle trips on a weekday.
The results of the VMT assessment indicate that the Project is not expected to have a significant impact on VMT based on the results of the SGVCOG’s VMT Tool. The Screening Tool estimates that the Project’s Home-Based VMT per Capita and Total VMT per Service Population would both be more than 30% below the SGVCOG VMT Baseline for the Project’s Baseline Area. Therefore, the Project is not expected to have a significant impact on VMT, and additional mitigation measures are not required.
Attachment A: Site Plan
81'-711
16"
1 26'-0"
24'-0"
48'-0"
1 TOT LOT
24'-0" 150'-0" 150'-0"
24'-0"
R17'-0"
BBQ
3 COMMON
OPEN
SPACE
DOG PARK
10 25'-0" 22'-0" 26'-0"
COMMON OPEN SPACE 26'-0" 24'-0" 26'-0" 26'-0" 22'-0"
R17'-0"
3 R17'-0"
4 1
R17'-0"
R17'-0"
R17'-0"
127'-10"
127'-10"
12'-1" 12'-0"
12'-1"
30'-0"
18 10'-0"
8 29'-3"
28'-0"
26'-8"
GAR. TO GAR.
1ST FLOOR TO 1ST FLOOR
2ND FLOOR TO 2ND FLOOR 127'-10"
29'-3"
28'-0"
26'-8"
GAR. TO GAR.
1ST FLOOR TO 1ST FLOOR
2ND FLOOR TO 2ND FLOOR 127'-10"
18'-0"
8 PLANTER MODIFIED
FOR 2-WAY
STREET 24'-0" 2-WAY 24'-0" STREET
EX. CURB TO REMAIN
24'-0"
EX. DIAGONAL PARKING TO BE CONVERTED TO PARALLEL PARKING - FOR 2-WAY STREET 6 9
EX. DIAGONAL PARKING TO BE CONVERTED TO PARALLEL PARKING - FOR 2-WAY STREET EX. CURB TO REMAIN
EX. PARKING
AREA TO REMAIN
APPROX. DRIVEWAY
LOCATION- VERIFY
ALL EX. CONDITION
10'-0"
18'-0"
2-WAY STREET 24'-0"
LE BORGNE AVE.
2-WAY STREET
NEW PARKING AREA
NEW PARKING AREA
NEW PARKING AREA
EX. PLANTER
TO REMAIN
EX. CURB TO REMAIN
EX. CURB TO REMAIN 10'-0"
EGRESS ONLY W/
22' W. VEHICULAR
GATE
R32'-0"
4 EX. PERPEND. PARKING TO BE CONVERTED TO
PARALLEL PARKING
R32'-0" TURNING RADIUS
R32'-0" TURNING RADIUS
EX. CURB TO REMAIN
LACOFD APPROVED
SPEED CUSHION
LACOFD APPROVED
SPEED CUSHION 17'-0" 11'-1
1 2
"
5'-0"
7'-0"
5'-0"
5'-0"
7'-0"
5'-0"
5'-0"
20'-1
3 4
" 5'-0" 20'-0"
5'-0"
6'-0"
5'-0"
6'-0" 5'-0" 7'-0" 5'-0" 5'-0" 7'-0" 5'-0"
12'-1"
12'-1" 44'-0"
35'-0" 20'-0"
10'-3"
6 EVA W/
VEHICULAR
GATE- TENANT
EXIT ONLY
24'-0" 26'-0"
PLANTER MODIFIED
FOR 2-WAY
STREET
34'-0"
R32'-0" TURNING
RADIUS
PARK
2 BBQ
44'-6" 12'-0" 11'-8"
GYM 30"
48" 60" MIN
56" MIN 30"
48" 60" MIN
56" MIN
PATIO
LOUNGE
OPEN OFFICE
OFFICE
POOL EQUIPMENT
RESTRM
CHEMICAL
WOMEN
MEN
SHWR
ELEC
STOR
KIT.
MAINTENANCE
34'-6" 12'-7"
PHONE: PHONE: JOB:
BALDWIN PARK DEVELOPMENTBALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
04.22.25 2310
CONCEPTUAL SITE PLAN
SCHEME 14
ADDRESS: 1314 E. LE BORGNE AVENUE
BALDWIN PARK, CA
ZONE-PROPOSED RESIDENTIAL- R3
SITE AREA-GROSS5.26 ACRES (+/- 229,167 SF)
YIELD 104 UNITS
DENSITY 19.8DU/AC
OPEN SPACE REQUIRED :
COMMON OPEN SPACE : 250 X 104= 26,000 SF
PRIVATE OPEN SPACE : 200 X 104= 20,800 SF
TOTAL OPEN SPACE : 46,800 SF
PARKING:
REQUIRED:
104 UNITS 2 & 3 BED x 2.0 SPACES = 208.0 SPACES
104 UNITS x .25 GUEST SPACES= 26.0 SPACES
TOTAL REQUIRED = 234.0 SPACES
PROVIDED:
104 UNITS x 2 CAR GARAGE = 208 SPACES
PARALLEL PARKING - 10' x 23' = 7 SPACES
90 DEGREE PARKING - 8.5' x 18' = 24 SPACES
239 SPACES
PARKING RATIO: 239/104= 2.3
PRODUCT:
RENTAL TOWNHOUSES - 104 UNITS:
39 PLAN 1 - 1,050 SF, 2 BED, 2.5 BA, 2 CAR GAR.
65 PLAN 2 - 1,250 SF, 3 BED, 2.5 BA, 2 CAR GAR.
104 TOTAL- TWO STORY
LOT COVERAGE: +/-89,110 / 226,200 = +/-39.4%
(60% MAX ALLOWED)
SITE PLAN A.1.0
APPLICANT:
STORM PROPERTIES, INC.
23223 NORMANDIE AVE.
TORRANCE, CA 90501
CONTACT: STORM BIRD
[email protected]
(310) 962-2439
ARCHITECT:
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR.
SANTA ANA, CA 92705
CONTACT: CHRISTINE LY
[email protected]
(714) 285-1888
0 20'
40'
80'
160'
OPEN SPACE PROVIDED :
COMMON OPEN SPACE : (20'x20' min.)
REC AREA: : 6,151 SF
FRONT PARK : 11,080 SF
MAIN PASEO/BBQ: 9,925 SF
MISC AREAS: : 1,904 SF
449 SF
722 SF
629 SF
1,263 SF
32,123 SF
PRIVATE OPEN SPACE : 10,400 SF (104 sf avg x100)
TOTAL OPEN SPACE : 43,527 SF
Attachment B: SGVCOG VMT
Screening Tool Outputs
SGVCOG VMT Evaluation Tool Report
Project Details
Timestamp of
Analysis
April 24, 2025, 02:05:36 PM
Project Name 1314 Le Borgne Ave
Project Description 104 unit residential
development
Project Location Map
jurisdiction:
Baldwin Park
APN TAZ
8558023910 22271200
Analysis Details
Data Version SCAG Regional Travel Demand
Model 2024
Analysis
Methodology
TAZ
Target Baseline
Year
2025
Project Land Use
Residential:
Single Family DU: 0
Multifamily DU: 104
Total DUs: 104
Non-Residential:
Office KSF: 0
Industrial KSF: 0
Local Serving Retail KSF: 0
Residential Affordability (percent of all
units):
Low Income: 0 %
Parking:
Motor Vehicle Parking: 239
Bicycle Parking: 0
Proximity Transit Screening
Inside a transit priority area? Yes
SGVCOG VMT Evaluation Tool Report
Residential Vehicle Miles Traveled (VMT) Screening Results Land Use Type Residential
VMT Metric Home-Based VMT per Capita
VMT Baseline Description SGVCOG
VMT Baseline Value 21.87
VMT Threshold Description /
Threshold Value
-15% / 18.59
Summary Project Without TDM Reduction Project With TDM Reduction Project Generated Vehicle Miles
Traveled (VMT) Rate
20.53 15.22
Screening Results Yes (Pass) Yes (Pass)
SGVCOG VMT Evaluation Tool Report
INDIVIDUAL MEASURE REDUCTION RESULTS VMT REDUCTION
LAND USE
T-01 Increase Residential Density (P/S) 25.87%
Residential density of project development (du/acre) 19.8 T-02 Increase Job Density (P/S) Not Selected
Job density of project development (jobs/acre) -
T-03 Provide Transit-Oriented Development (P/S) Not Selected T-04 Integrate Affordable and Below Market Rate Housing (P/S) Not Selected Percent of multifamily units permanently dedicated as affordable (%) - T-17 Improve Street Connectivity (P/C) Not Selected
Intersection density in project site with measure (int/sq mile) -
SGVCOG VMT Evaluation Tool Report
Project Details
Timestamp of
Analysis
April 24, 2025, 02:06:12 PM
Project Name 1314 Le Borgne Ave
Project Description 104 unit residential
development
Project Location Map
jurisdiction:
Baldwin Park
APN TAZ
8558023910 22271200
Analysis Details
Data Version SCAG Regional Travel Demand
Model 2024
Analysis
Methodology
TAZ
Target Baseline
Year
2025
Project Land Use
Residential:
Single Family DU: 0
Multifamily DU: 104
Total DUs: 104
Non-Residential:
Office KSF: 0
Industrial KSF: 0
Local Serving Retail KSF: 0
Residential Affordability (percent of all
units):
Low Income: 0 %
Parking:
Motor Vehicle Parking: 239
Bicycle Parking: 0
Proximity Transit Screening
Inside a transit priority area? Yes
SGVCOG VMT Evaluation Tool Report
Residential Vehicle Miles Traveled (VMT) Screening Results Land Use Type Residential
VMT Metric Total VMT per Service Population
VMT Baseline Description SGVCOG
VMT Baseline Value 31.17
VMT Threshold Description /
Threshold Value
-15% / 26.50
Summary Project Without TDM Reduction Project With TDM Reduction Project Generated Vehicle Miles
Traveled (VMT) Rate
26.64 19.75
Screening Results Yes (Pass) Yes (Pass)
SGVCOG VMT Evaluation Tool Report
INDIVIDUAL MEASURE REDUCTION RESULTS VMT REDUCTION
LAND USE
T-01 Increase Residential Density (P/S) 25.87%
Residential density of project development (du/acre) 19.8 T-02 Increase Job Density (P/S) Not Selected
Job density of project development (jobs/acre) -
T-03 Provide Transit-Oriented Development (P/S) Not Selected T-04 Integrate Affordable and Below Market Rate Housing (P/S) Not Selected Percent of multifamily units permanently dedicated as affordable (%) - T-17 Improve Street Connectivity (P/C) Not Selected
Intersection density in project site with measure (int/sq mile) -
P
Appendix B- Traffic Count Sheets
T112224
DATE: LOCATION: PROJECT #: SC5413
Tue, May 20, 25 NORTH & SOUTH: LOCATION #: 1
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 0 X 0 0 1 X X 1 0 0 0 0 0
7:00 AM 0 0 0 0 0 0 0 1 0 0 2 0 3 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 1 1 2 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 2 0 0 2 0 4 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 1 0 0 0 2 1 4 0 0 0 0 0
8:00 AM 0 0 0 4 0 7 0 1 0 0 2 0 14 0 0 0 0 0
8:15 AM 0 0 0 2 0 4 1 1 0 0 1 1 10 0 0 0 0 0
8:30 AM 0 0 0 0 0 1 1 0 0 0 1 1 4 0 0 0 0 0
8:45 AM 0 0 0 0 0 2 0 2 0 0 2 0 6 0 0 0 0 0
VOLUMES 0 0 0 6 0 14 3 7 0 0 13 4 47 0 0 0 0 0
APPROACH % 0% 0% 0% 30% 0% 70% 30% 70% 0% 0% 76% 24%
APP/DEPART 0 / 7 20 / 0 10 / 13 17 / 27 0
BEGIN PEAK HR
VOLUMES 0 0 0 6 0 14 2 4 0 0 6 2 34 0 0 0 0
APPROACH % 0% 0% 0% 30% 0% 70% 33% 67% 0% 0% 75% 25%
PEAK HR FACTOR 0.000 0.455 0.750 1.000 0.607
APP/DEPART 0 / 4 20 / 0 6 / 10 8 / 20 0
4:00 PM 0 0 0 1 0 0 0 2 0 0 1 1 5 0 0 0 0 0
4:15 PM 0 0 0 1 0 0 0 2 0 0 2 0 5 0 0 0 0 0
4:30 PM 0 0 0 2 0 3 0 2 0 0 4 0 11 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 1 0 0 4 0 5 0 0 0 0 0
5:00 PM 0 0 0 1 0 0 0 2 0 0 2 0 5 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 1 0 0 3 0 4 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 1 0 0 3 0 4 0 0 1 0 1
5:45 PM 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0
VOLUMES 0 0 0 5 0 3 0 11 0 0 21 1 42 0 0 1 0 1
APPROACH % 0% 0% 0% 63% 0% 38% 0% 92% 0% 0% 95% 5%
APP/DEPART 0 / 1 8 / 0 12 / 16 22 / 25 0
BEGIN PEAK HR
VOLUMES 0 0 0 4 0 3 0 7 0 0 12 0 26 0 0 0 0
APPROACH % 0% 0% 0% 57% 0% 43% 0% 100% 0% 0% 100% 0%
PEAK HR FACTOR 0.000 0.350 0.875 0.750 0.591
APP/DEPART 0 / 0 7 / 0 7 / 11 12 / 15 0
Le Borgne Ave
NORTH LEG
Millbury Ave WEST LEG EAST LEG Millbury Ave
SOUTH LEG
Le Borgne Ave
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Baldwin Park
Le Borgne Ave
Millbury Ave
U-TURNS
Le Borgne Ave Le Borgne Ave Millbury Ave Millbury Ave AM 8:00 AM PM
4:15 PM
28 17 0 11 TOTAL 8
8 3 0 5 PM 1
20 14 0 6 AM 7 17 22 39 52 25 27 4 1 5 13 21 34 TOTAL PMAM0 0 0 3 0 3 AMPM TOTAL 18 11 7 0 0 0 13 16 29 22 12 10 0 AM 0 0 0 0
0 PM 0 0 0 0
0 TOTAL 0 0 0 0
27 17 0 10 TOTAL 4
7 3 0 4 PM 0
20 14 0 6 AM 4 8 12 20 35 15 20 2 0 2 6 12 18 TOTAL PMAMAM 8:00 AM 8:45 AM 0 0 0 2 0 2
#N/A AMPM TOTAL 11 7 4 PM 4:15 PM
5:45 PM 0 0 0 10 11 21 13 7 6
0 AM 0 0 0 0
0 PM 0 0 0 0
0 Total 0 0 0 0
AimTD LLC
TURNING MOVEMENT COUNTS
Le Borgne Ave Millbury AveMillbury AveALL HOURS
Baldwin Park
SC5413
Le Borgne Ave
Le Borgne Ave
Le Borgne Ave Millbury AveMillbury Ave
PEAK HOUR
T102424
DATE: LOCATION: PROJECT #: SC5413
Tue, May 20, 25 NORTH & SOUTH: LOCATION #: 2
EAST & WEST: CONTROL: STOP ALL
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 0 X 0 0 1 X X 1 0 0 0 0 0
7:00 AM 0 0 0 3 0 0 0 4 0 0 2 3 12 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 5 0 0 0 1 6 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 4 0 0 6 2 12 0 0 0 0 0
7:45 AM 0 0 0 1 0 0 5 3 0 0 3 9 21 0 0 0 1 1
8:00 AM 0 0 0 4 0 3 6 8 0 0 7 16 44 0 0 0 0 0
8:15 AM 0 0 0 1 0 1 0 4 0 0 1 5 12 0 0 0 0 0
8:30 AM 0 0 0 2 0 0 0 2 0 0 2 0 6 0 0 0 0 0
8:45 AM 0 0 0 1 0 0 0 6 0 0 4 0 11 0 0 0 0 0
VOLUMES 0 0 0 12 0 4 11 36 0 0 25 36 125 0 0 0 1 1
APPROACH % 0% 0% 0% 75% 0% 25% 23% 77% 0% 0% 40% 58%
APP/DEPART 0 / 47 16 / 0 47 / 49 62 / 29 0
BEGIN PEAK HR
VOLUMES 0 0 0 6 0 4 11 19 0 0 17 32 90 0 0 0 1
APPROACH % 0% 0% 0% 60% 0% 40% 37% 63% 0% 0% 34% 64%
PEAK HR FACTOR 0.000 0.357 0.536 0.543 0.511
APP/DEPART 0 / 43 10 / 0 30 / 26 50 / 21 0
4:00 PM 0 0 0 1 0 0 0 7 0 0 2 0 10 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 3 0 0 2 0 5 0 0 0 0 0
4:30 PM 0 0 0 0 0 1 1 6 0 0 7 1 16 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 4 0 0 6 1 11 0 0 0 0 0
5:00 PM 0 0 0 1 0 0 0 10 0 0 4 0 15 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 1 2 0 0 7 2 12 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 5 0 0 7 1 13 0 0 0 0 0
5:45 PM 0 0 0 4 0 0 0 2 0 0 2 2 10 0 0 0 0 0
VOLUMES 0 0 0 6 0 1 2 39 0 0 37 7 92 0 0 0 0 0
APPROACH % 0% 0% 0% 86% 0% 14% 5% 95% 0% 0% 84% 16%
APP/DEPART 0 / 9 7 / 0 41 / 45 44 / 38 0
BEGIN PEAK HR
VOLUMES 0 0 0 1 0 1 2 22 0 0 24 4 54 0 0 0 0
APPROACH % 0% 0% 0% 50% 0% 50% 8% 92% 0% 0% 86% 14%
PEAK HR FACTOR 0.000 0.500 0.600 0.778 0.844
APP/DEPART 0 / 6 2 / 0 24 / 23 28 / 25 0
Le Borgne Ave
NORTH LEG
Barrydale St WEST LEG EAST LEG Barrydale St
SOUTH LEG
Le Borgne Ave
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Baldwin Park
Le Borgne Ave
Barrydale St
U-TURNS
Le Borgne Ave Le Borgne Ave Barrydale St Barrydale St AM 7:30 AM PM
4:30 PM
23 5 0 18 TOTAL 56
7 1 0 6 PM 9
16 4 0 12 AM 47 62 44 106 67 38 29 36 7 43 25 37 62 TOTAL PMAM0 0 0 13 2 11 AMPM TOTAL 75 39 36 0 0 0 49 45 94 88 41 47 0 AM 0 0 0 0
0 PM 0 0 0 0
0 TOTAL 0 0 0 0
12 5 0 7 TOTAL 49
2 1 0 1 PM 6
10 4 0 6 AM 43 50 28 78 46 25 21 32 4 36 17 24 41 TOTAL PMAMAM 7:30 AM 8:45 AM 0 0 0 13 2 11
#N/A AMPM TOTAL 41 22 19 PM 4:30 PM
5:45 PM 0 0 0 26 23 49 54 24 30
0 AM 0 0 0 0
0 PM 0 0 0 0
0 Total 0 0 0 0
AimTD LLC
TURNING MOVEMENT COUNTS
Le Borgne Ave Barrydale StBarrydale St ALL HOURS
Baldwin Park
SC5413
Le Borgne Ave
Le Borgne Ave
Le Borgne Ave Barrydale StBarrydale St
PEAK HOUR
T112224
DATE: LOCATION: PROJECT #: SC5413
Tue, May 20, 25 NORTH & SOUTH: LOCATION #: 3
EAST & WEST: CONTROL: STOP N/S
NOTES: AM ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 2 0 1 2 0 0 0 0 0
7:00 AM 1 0 20 1 0 7 4 117 1 6 200 2 359 0 0 0 4 4
7:15 AM 2 0 26 1 0 4 3 131 1 10 225 2 405 0 0 0 9 9
7:30 AM 1 1 23 4 1 8 2 146 0 8 256 4 454 0 0 0 7 7
7:45 AM 1 1 30 0 3 12 8 215 2 15 253 6 546 0 0 1 2 3
8:00 AM 0 1 32 2 1 13 9 221 1 18 241 4 543 0 0 0 7 7
8:15 AM 0 2 20 2 0 16 14 204 1 12 223 3 497 0 0 0 3 3
8:30 AM 1 1 15 1 0 4 4 197 2 9 219 5 458 0 0 0 3 3
8:45 AM 1 0 13 3 1 11 4 184 0 6 174 4 401 0 0 1 2 3
VOLUMES 7 6 179 14 6 75 48 1,415 8 84 1,791 30 3,702 0 0 2 37 39 APPROACH % 4% 3% 93% 15% 6% 79% 3% 96% 1% 4% 92% 2%
APP/DEPART 192 / 84 95 / 98 1,473 / 1,645 1,942 / 1,875 0
BEGIN PEAK HR
VOLUMES 2 5 97 5 4 45 35 837 6 54 936 18 2,060 0 0 1 15 APPROACH % 2% 5% 93% 9% 7% 83% 4% 95% 1% 5% 91% 2%
PEAK HR FACTOR 0.788 0.750 0.951 0.927 0.936
APP/DEPART 104 / 58 54 / 64 879 / 954 1,023 / 984 0
4:00 PM 0 2 18 1 0 8 3 264 1 17 148 11 473 0 0 1 5 6
4:15 PM 1 1 14 1 0 3 5 281 5 22 171 9 513 0 0 0 5 5
4:30 PM 1 2 11 0 0 8 11 256 4 10 129 10 442 0 0 1 4 5
4:45 PM 2 0 11 3 0 8 8 271 2 15 118 9 447 0 0 0 4 4
5:00 PM 1 2 14 5 0 5 5 255 6 22 139 6 460 0 0 0 3 3
5:15 PM 0 0 12 1 1 13 11 254 4 16 157 3 472 0 0 0 2 2
5:30 PM 0 2 10 4 0 4 3 240 6 12 146 5 432 0 0 0 4 4
5:45 PM 0 1 8 1 0 9 8 222 6 19 152 9 435 0 0 0 3 3
VOLUMES 5 10 98 16 1 58 54 2,043 34 133 1,160 62 3,706 0 0 2 30 32 APPROACH % 4% 9% 87% 21% 1% 77% 3% 96% 2% 10% 84% 4%
APP/DEPART 113 / 126 75 / 168 2,133 / 2,187 1,385 / 1,225 0
BEGIN PEAK HR
VOLUMES 4 5 54 5 0 27 27 1,072 12 64 566 39 1,895 0 0 2 18 APPROACH % 6% 8% 86% 16% 0% 84% 2% 96% 1% 9% 82% 6%
PEAK HR FACTOR 0.788 0.727 0.956 0.830 0.915
APP/DEPART 63 / 71 32 / 76 1,113 / 1,149 687 / 599 0
Barrydale St
NORTH LEG
Puente Ave WEST LEG EAST LEG Puente Ave
SOUTH LEG
Barrydale St AM
7:45 AM PM
4:00 PM
U-TURNS
Barrydale St Barrydale St Puente Ave Puente Ave
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Baldwin Park
Barrydale St
Puente Ave
170 133 7 30 TOTAL 210
75 58 1 16 PM 126
95 75 6 14 AM 84 1,942 1,385 3,327 3,100 1,225 1,875 30 62 92 1,791 1,160 2,951 TOTAL PMAM84 133 217 102 54 48 AMPM TOTAL 3,458 2,043 1,415 42 34 8 1,645 2,187 3,832 3,606 2,133 1,473 98 AM 7 6 179 192
168 PM 5 10 98 113
266 TOTAL 12 16 277 305
86 72 4 10 TOTAL 129
32 27 0 5 PM 71
54 45 4 5 AM 58 1,023 687 1,710 1,583 599 984 18 39 57 936 566 1,502 TOTAL PMAMAM 7:45 AM 8:45 AM 54 64 118 62 27 35
#N/A AMPM TOTAL 1,909 1,072 837 PM 4:00 PM
5:45 PM 18 12 6 954 1,149 2,103 1,992 1,113 879
64 AM 2 5 97 104
76 PM 4 5 54 63
140 Total 6 10 151 167
Barrydale St
Barrydale St
Barrydale St Puente AvePuente Ave
PEAK HOUR
AimTD LLC
TURNING MOVEMENT COUNTS
Barrydale St Puente AvePuente AveALL HOURS
Baldwin Park
SC5413
T112224
DATE: LOCATION: PROJECT #: SC5413
Tue, May 20, 25 NORTH & SOUTH: LOCATION #: 4
EAST & WEST: CONTROL: STOP E
NOTES: q ▲
PM N
MD ◄ W E ►
OTHER S
OTHER ▼
NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND
NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 2 0 0 2 0 0 1 0 0 1 0 0 0 0 0
7:00 AM 1 263 1 0 112 7 10 0 13 0 0 0 407 0 0 0 0 0
7:15 AM 4 273 0 0 132 10 20 0 13 0 0 0 452 0 0 0 0 0
7:30 AM 6 283 0 0 192 6 12 0 14 0 0 1 514 0 0 0 0 0
7:45 AM 10 288 2 1 164 15 5 0 16 0 0 0 501 0 0 0 0 0
8:00 AM 3 254 0 0 183 9 5 0 22 1 0 0 477 0 0 0 0 0
8:15 AM 9 262 0 0 175 15 8 0 18 0 0 0 487 0 0 0 0 0
8:30 AM 5 217 0 1 183 4 6 0 13 0 0 1 430 0 0 0 0 0
8:45 AM 2 194 5 0 141 13 9 0 10 2 0 0 376 0 0 0 0 0
VOLUMES 40 2,034 8 2 1,282 79 75 0 119 3 0 2 3,644 0 0 0 0 0 APPROACH % 2% 98% 0% 0% 94% 6% 39% 0% 61% 60% 0% 40%
APP/DEPART 2,082 / 2,111 1,363 / 1,404 194 / 10 5 / 119 0
BEGIN PEAK HR
VOLUMES 28 1,087 2 1 714 45 30 0 70 1 0 1 1,979 0 0 0 0 APPROACH % 3% 97% 0% 0% 94% 6% 30% 0% 70% 50% 0% 50%
PEAK HR FACTOR 0.931 0.960 0.926 0.500 0.963
APP/DEPART 1,117 / 1,118 760 / 785 100 / 3 2 / 73 0
4:00 PM 5 147 0 0 239 23 8 0 19 0 0 0 441 0 0 0 0 0
4:15 PM 6 166 2 1 236 15 8 0 16 0 0 1 451 0 0 0 0 0
4:30 PM 10 162 1 0 227 12 17 0 12 0 0 0 441 0 0 0 0 0
4:45 PM 11 197 0 0 209 16 5 0 14 0 0 2 454 0 0 0 0 0
5:00 PM 8 175 0 0 263 8 2 0 15 0 0 1 472 0 0 0 0 0
5:15 PM 8 180 0 0 194 12 9 0 14 1 0 1 419 0 0 0 0 0
5:30 PM 17 184 0 0 241 14 9 0 9 0 0 0 474 0 0 0 0 0
5:45 PM 9 147 0 1 215 13 16 0 13 3 0 0 417 0 0 0 0 0
VOLUMES 74 1,358 3 2 1,824 113 74 0 112 4 0 5 3,569 0 0 0 0 0 APPROACH % 5% 95% 0% 0% 94% 6% 40% 0% 60% 44% 0% 56%
APP/DEPART 1,435 / 1,437 1,939 / 1,940 186 / 5 9 / 187 0
BEGIN PEAK HR
VOLUMES 44 736 0 0 907 50 25 0 52 1 0 4 1,819 0 0 0 0
APPROACH % 6% 94% 0% 0% 95% 5% 32% 0% 68% 20% 0% 80%
PEAK HR FACTOR 0.938 0.883 0.837 0.625 0.959
APP/DEPART 780 / 765 957 / 960 77 / 0 5 / 94 0
Francisquito Ave
NORTH LEG
Van Wig Ave WEST LEG EAST LEG Driveway
SOUTH LEG
Francisquito Ave
INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Baldwin Park
Francisquito Ave
Van Wig Ave
U-TURNS
Francisquito Ave
Queue NB AM/PM; Queue SB PM
Francisquito Ave Van Wig Ave Driveway AM
7:30 AM PM
4:45 PM
3,302 192 3,106 4 TOTAL 3,548
1,939 113 1,824 2 PM 1,437
1,363 79 1,282 2 AM 2,111 5 9 14 306 187 119 2 5 7 0 0 0 TOTAL PMAM3 4 7 149 74 75 AMPM TOTAL 0 0 0 231 112 119 10 5 15 380 186 194 1,404 AM 40 2,034 8 2,082
1,940 PM 74 1,358 3 1,435
3,344 TOTAL 114 3,392 11 3,517
1,717 95 1,621 1 TOTAL 1,883
957 50 907 0 PM 765
760 45 714 1 AM 1,118 2 5 7 167 94 73 1 4 5 0 0 0 TOTAL PMAMAM 7:30 AM 8:45 AM 1 1 2 55 25 30
#N/A AMPM TOTAL 0 0 0 PM 4:45 PM
5:45 PM 122 52 70 3 0 3 177 77 100
785 AM 28 1,087 2 1,117
960 PM 44 736 0 780
1,745 Total 72 1,823 2 1,897
AimTD LLC
TURNING MOVEMENT COUNTS
Francisquito Ave Van Wig AveDrivewayALL HOURS
Baldwin Park
SC5413
Francisquito Ave
Francisquito Ave
Francisquito Ave Van Wig AveDriveway
PEAK HOUR
P
Appendix C - Traffic Operations Synchro Reports:
LOS, Delay, and Queues
HCM 7th TWSC Existing Conditions
1: Millbury Ave & Le Borgne Ave AM Peak Hour
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 1
Intersection
Int Delay, s/veh 5.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 6 14 2 4 6 2
Future Vol, veh/h 6 14 2 4 6 2
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 61 61 61 61 61 61
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 10 23 3 7 10 3
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 25 11 13 0 - 0
Stage 1 11 - - - - -
Stage 2 13 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 991 1069 1605 - - -
Stage 1 1011 - - - - -
Stage 2 1010 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 989 1069 1605 - - -
Mov Cap-2 Maneuver 989 - - - - -
Stage 1 1009 - - - - -
Stage 2 1010 - - - - -
Approach EB NB SB
HCM Control Delay, s/v 8.56 2.42 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 600 - 1044 - -
HCM Lane V/C Ratio 0.002 - 0.031 - -
HCM Control Delay (s/veh) 7.2 0 8.6 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
HCM 7th AWSC Existing Conditions
2: Barrydale St & Le Borgne Ave AM Peak Hour
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 2
Intersection
Intersection Delay, s/veh 7.2
Intersection LOS A
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 11 19 18 32 6 4
Future Vol, veh/h 11 19 18 32 6 4
Peak Hour Factor 0.51 0.51 0.51 0.51 0.51 0.51
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 22 37 35 63 12 8
Number of Lanes 0 1 1 0 1 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay, s/veh 7.4 7 7.2
HCM LOS A A A
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 37% 0% 60%
Vol Thru, % 63% 36% 0%
Vol Right, % 0% 64% 40%
Sign Control Stop Stop Stop
Traffic Vol by Lane 30 50 10
LT Vol 11 0 6
Through Vol 19 18 0
RT Vol 0 32 4
Lane Flow Rate 59 98 20
Geometry Grp 1 1 1
Degree of Util (X) 0.067 0.099 0.022
Departure Headway (Hd) 4.114 3.627 4.082
Convergence, Y/N Yes Yes Yes
Cap 872 988 871
Service Time 2.134 1.649 2.133
HCM Lane V/C Ratio 0.068 0.099 0.023
HCM Control Delay, s/veh 7.4 7 7.2
HCM Lane LOS A A A
HCM 95th-tile Q 0.2 0.3 0.1
HCM 7th TWSC Existing Conditions
3: Puente Ave & Barrydale St AM Peak Hour
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 1
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 5 4 45 2 5 97 1 35 837 6 15 54 936 18 Future Vol, veh/h 5 4 45 2 5 97 1 35 837 6 15 54 936 18 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None
Storage Length - - - - - - - 100 - - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 -
Grade, % - 0 - - 0 - - - 0 - - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 4 48 2 5 103 1 37 890 6 16 57 996 19
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1677 2126 507 1617 2132 448 1015 1015 0 0 897 897 0 0 Stage 1 1152 1152 - 970 970 ---------
Stage 2 524 973 - 647 1162 ---------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 6.44 4.14 - - 6.44 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.52 2.22 - - 2.52 2.22 - - Pot Cap-1 Maneuver 62 49 510 69 49 558 325 679 - - 387 753 - - Stage 1 210 270 - 272 330 ---------
Stage 2 504 328 - 426 268 ---------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 37 41 510 47 40 558 655 655 - - 578 578 - - Mov Cap-2 Maneuver 37 41 - 47 40 ---------
Stage 1 184 236 - 256 310 ---------
Stage 2 380 309 - 331 234 ---------
Approach EB WB NB SB
HCM Control Delay, s/v37.27 23.39 0.44 0.82
HCM LOS E C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 655 - - 168 305 578 - -
HCM Lane V/C Ratio 0.058 - - 0.343 0.363 0.127 - -
HCM Control Delay (s/veh) 10.8 - - 37.3 23.4 12.1 - -
HCM Lane LOS B - - E C B - -
HCM 95th %tile Q(veh) 0.2 - - 1.4 1.6 0.4 - -
HCM 7th TWSC Existing Conditions
4: Van Wig Ave/Commercial Driveway & Francisquito Ave AM Peak Hour LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 4
Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 1 714 45 28 1087 2 30 0 70 1 0 1
Future Vol, veh/h 1 714 45 28 1087 2 30 0 70 1 0 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 744 47 29 1132 2 31 0 73 1 0 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 1134 0 0 791 0 0 1394 1962 395 1566 1984 567 Stage 1 - - - - - - 769 769 - 1192 1192 -
Stage 2 - - - - - - 624 1193 - 374 793 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 612 - - 825 - - 101 63 604 75 61 467 Stage 1 - - - - - - 360 409 - 199 259 -
Stage 2 - - - - - - 439 259 - 619 398 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 612 - - 825 - - 95 59 604 63 57 467
Mov Cap-2 Maneuver - - - - - - 95 59 - 63 57 -
Stage 1 - - - - - - 359 408 - 188 245 -
Stage 2 - - - - - - 416 245 - 543 398 -
Approach EB WB NB SB
HCM Control Delay, s/v 0.04 0.69 32.48 38.23
HCM LOS D E
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 232 4 - - 90 - - 110
HCM Lane V/C Ratio 0.448 0.002 - - 0.035 - - 0.019
HCM Control Delay (s/veh) 32.5 10.9 0 - 9.5 0.5 - 38.2
HCM Lane LOS D B A - A A - E
HCM 95th %tile Q(veh) 2.1 0 - - 0.1 - - 0.1
HCM 7th TWSC Existing Conditions
1: Millbury Ave & Le Borgne Ave PM Peak Hour
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 1
Intersection
Int Delay, s/veh 2.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 3 0 7 12 0
Future Vol, veh/h 4 3 0 7 12 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 59 59 59 59 59 59
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 7 5 0 12 20 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 32 20 20 0 - 0
Stage 1 20 - - - - -
Stage 2 12 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 981 1057 1596 - - -
Stage 1 1002 - - - - -
Stage 2 1011 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 981 1057 1596 - - -
Mov Cap-2 Maneuver 981 - - - - -
Stage 1 1002 - - - - -
Stage 2 1011 - - - - -
Approach EB NB SB
HCM Control Delay, s/v 8.6 0 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1596 - 1013 - -
HCM Lane V/C Ratio - - 0.012 - -
HCM Control Delay (s/veh) 0 - 8.6 - -
HCM Lane LOS A - A - -
HCM 95th %tile Q(veh) 0 - 0 - -
HCM 7th AWSC Existing Conditions
2: Barrydale St & Le Borgne Ave PM Peak Hour
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 2
Intersection
Intersection Delay, s/veh 7
Intersection LOS A
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 2 22 24 4 1 1
Future Vol, veh/h 2 22 24 4 1 1
Peak Hour Factor 0.84 0.84 0.84 0.84 0.84 0.84
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 26 29 5 1 1
Number of Lanes 0 1 1 0 1 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay, s/veh 7.1 7 6.9
HCM LOS A A A
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 8% 0% 50%
Vol Thru, % 92% 86% 0%
Vol Right, % 0% 14% 50%
Sign Control Stop Stop Stop
Traffic Vol by Lane 24 28 2
LT Vol 2 0 1
Through Vol 22 24 0
RT Vol 0 4 1
Lane Flow Rate 29 33 2
Geometry Grp 1 1 1
Degree of Util (X) 0.032 0.036 0.003
Departure Headway (Hd) 3.98 3.873 3.841
Convergence, Y/N Yes Yes Yes
Cap 903 928 931
Service Time 1.987 1.881 1.866
HCM Lane V/C Ratio 0.032 0.036 0.002
HCM Control Delay, s/veh 7.1 7 6.9
HCM Lane LOS A A A
HCM 95th-tile Q 0.1 0.1 0
HCM 7th TWSC Existing Conditions
3: Puente Ave & Barrydale St PM Peak Hour
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 1
Intersection
Int Delay, s/veh 2.4
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 5 0 27 4 5 54 2 27 1072 12 18 64 566 39 Future Vol, veh/h 5 0 27 4 5 54 2 27 1072 12 18 64 566 39 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None
Storage Length - - - - - - - 100 - - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 -
Grade, % - 0 - - 0 - - - 0 - - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91 91 91 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 0 30 4 5 59 2 30 1178 13 20 70 622 43
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1479 2079 332 1740 2093 596 665 665 0 0 1191 1191 0 0 Stage 1 824 824 - 1248 1248 ---------
Stage 2 655 1255 - 491 845 ---------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 6.44 4.14 - - 6.44 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.52 2.22 - - 2.52 2.22 - - Pot Cap-1 Maneuver 87 53 663 56 52 447 544 920 - - 250 582 - - Stage 1 334 386 - 183 243 ---------
Stage 2 421 241 - 528 377 ---------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 51 40 663 40 39 447 874 874 - - 425 425 - - Mov Cap-2 Maneuver 51 40 - 40 39 ---------
Stage 1 263 304 - 177 234 ---------
Stage 2 344 233 - 397 297 ---------
Approach EB WB NB SB
HCM Control Delay, s/v23.34 36.6 0.24 1.88
HCM LOS C E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 874 - - 231 181 425 - -
HCM Lane V/C Ratio 0.036 - - 0.152 0.382 0.212 - -
HCM Control Delay (s/veh) 9.3 - - 23.3 36.6 15.7 - -
HCM Lane LOS A - - C E C - -
HCM 95th %tile Q(veh) 0.1 - - 0.5 1.7 0.8 - -
HCM 7th TWSC Existing Conditions
4: Van Wig Ave/Commercial Driveway & Francisquito Ave PM Peak Hour LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 4
Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 0 907 50 44 736 0 25 0 52 1 0 4
Future Vol, veh/h 0 907 50 44 736 0 25 0 52 1 0 4
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - 400 - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 945 52 46 767 0 26 0 54 1 0 4
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 767 0 0 997 0 0 1446 1829 498 1331 1855 383 Stage 1 - - - - - - 971 971 - 858 858 -
Stage 2 - - - - - - 475 858 - 472 997 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 843 - - 690 - - 92 76 517 113 73 615 Stage 1 - - - - - - 271 329 - 318 372 -
Stage 2 - - - - - - 539 372 - 541 320 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 843 - - 690 - - 86 71 517 94 68 615
Mov Cap-2 Maneuver - - - - - - 86 71 - 94 68 -
Stage 1 - - - - - - 271 329 - 297 347 -
Stage 2 - - - - - - 500 347 - 485 320 -
Approach EB WB NB SB
HCM Control Delay, s/v 0 1.19 35.43 17.56
HCM LOS E C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 196 843 - - 203 - - 292
HCM Lane V/C Ratio 0.408 - - - 0.066 - - 0.018
HCM Control Delay (s/veh) 35.4 0 - - 10.6 0.6 - 17.6
HCM Lane LOS E A - - B A - C
HCM 95th %tile Q(veh) 1.8 0 - - 0.2 - - 0.1
HCM 7th TWSC Plus Project
1: Millbury Ave & Le Borgne Ave AM Peak Hour PP
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 1
Intersection
Int Delay, s/veh 6.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 21 21 6 4 6 7
Future Vol, veh/h 21 21 6 4 6 7
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 61 61 61 61 61 61
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 34 34 10 7 10 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 42 16 21 0 - 0
Stage 1 16 - - - - -
Stage 2 26 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 969 1064 1594 - - -
Stage 1 1007 - - - - -
Stage 2 996 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 963 1064 1594 - - -
Mov Cap-2 Maneuver 963 - - - - -
Stage 1 1001 - - - - -
Stage 2 996 - - - - -
Approach EB NB SB
HCM Control Delay, s/v 8.82 4.36 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1080 - 1011 - -
HCM Lane V/C Ratio 0.006 - 0.068 - -
HCM Control Delay (s/veh) 7.3 0 8.8 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0.2 - -
HCM 7th AWSC Plus Project
2: Barrydale St & Le Borgne Ave AM Peak Hour PP
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 2
Intersection
Intersection Delay, s/veh 7.3
Intersection LOS A
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 12 20 19 33 13 9
Future Vol, veh/h 12 20 19 33 13 9
Peak Hour Factor 0.51 0.51 0.51 0.51 0.51 0.51
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 24 39 37 65 25 18
Number of Lanes 0 1 1 0 1 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay, s/veh 7.5 7.1 7.4
HCM LOS A A A
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 38% 0% 59%
Vol Thru, % 63% 37% 0%
Vol Right, % 0% 63% 41%
Sign Control Stop Stop Stop
Traffic Vol by Lane 32 52 22
LT Vol 12 0 13
Through Vol 20 19 0
RT Vol 0 33 9
Lane Flow Rate 63 102 43
Geometry Grp 1 1 1
Degree of Util (X) 0.073 0.104 0.049
Departure Headway (Hd) 4.161 3.675 4.09
Convergence, Y/N Yes Yes Yes
Cap 859 972 869
Service Time 2.195 1.712 2.147
HCM Lane V/C Ratio 0.073 0.105 0.049
HCM Control Delay, s/veh 7.5 7.1 7.4
HCM Lane LOS A A A
HCM 95th-tile Q 0.2 0.3 0.2
HCM 7th TWSC Plus Project
3: Puente Ave & Barrydale St AM Peak Hour PP
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 1
Intersection
Int Delay, s/veh 3.8
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 9 4 55 2 5 100 1 39 862 6 15 56 965 19 Future Vol, veh/h 9 4 55 2 5 100 1 39 862 6 15 56 965 19 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None
Storage Length - - - - - - - 100 - - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 -
Grade, % - 0 - - 0 - - - 0 - - - 0 -
Peak Hour Factor 94 94 94 94 94 94 94 94 94 94 94 94 94 94 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 10 4 59 2 5 106 1 41 917 6 16 60 1027 20
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1734 2196 523 1672 2203 462 1047 1047 0 0 923 923 0 0 Stage 1 1188 1188 - 1005 1005 ---------
Stage 2 546 1009 - 666 1198 ---------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 6.44 4.14 - - 6.44 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.52 2.22 - - 2.52 2.22 - - Pot Cap-1 Maneuver 56 44 498 63 44 547 310 660 - - 372 735 - - Stage 1 200 260 - 259 317 ---------
Stage 2 489 316 - 415 257 ---------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 32 36 498 40 36 547 638 638 - - 562 562 - - Mov Cap-2 Maneuver 32 36 - 40 36 ---------
Stage 1 173 225 - 241 296 ---------
Stage 2 361 295 - 311 223 ---------
Approach EB WB NB SB
HCM Control Delay, s/v58.71 25.58 0.49 0.83
HCM LOS F D
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 638 - - 135 287 562 - -
HCM Lane V/C Ratio 0.067 - - 0.535 0.397 0.134 - -
HCM Control Delay (s/veh) 11 - - 58.7 25.6 12.4 - -
HCM Lane LOS B - - F D B - -
HCM 95th %tile Q(veh) 0.2 - - 2.6 1.8 0.5 - -
HCM 7th TWSC Plus Project
4: Van Wig Ave/Commercial Driveway & Francisquito Ave AM Peak Hour PP LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 4
Intersection
Int Delay, s/veh 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 1 736 47 33 1120 2 36 0 82 1 0 1
Future Vol, veh/h 1 736 47 33 1120 2 36 0 82 1 0 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 1 767 49 34 1167 2 38 0 85 1 0 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 1169 0 0 816 0 0 1445 2031 408 1622 2054 584 Stage 1 - - - - - - 793 793 - 1236 1236 -
Stage 2 - - - - - - 652 1238 - 385 818 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 593 - - 808 - - 93 57 593 68 55 455
Stage 1 - - - - - - 348 398 - 186 246 -
Stage 2 - - - - - - 423 246 - 609 388 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 593 - - 808 - - 86 53 593 55 51 455
Mov Cap-2 Maneuver - - - - - - 86 53 - 55 51 -
Stage 1 - - - - - - 347 397 - 175 231 -
Stage 2 - - - - - - 395 231 - 520 387 -
Approach EB WB NB SB
HCM Control Delay, s/v 0.04 0.83 42.89 42.71
HCM LOS E E
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 212 4 - - 103 - - 98
HCM Lane V/C Ratio 0.579 0.002 - - 0.043 - - 0.021
HCM Control Delay (s/veh) 42.9 11.1 0 - 9.7 0.6 - 42.7
HCM Lane LOS E B A - A A - E
HCM 95th %tile Q(veh) 3.2 0 - - 0.1 - - 0.1
HCM 7th TWSC Plus Project
1: Millbury Ave & Le Borgne Ave PM Peak Hour PP
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 13 7 12 7 12 17
Future Vol, veh/h 13 7 12 7 12 17
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 59 59 59 59 59 59
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 22 12 20 12 20 29
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 87 35 49 0 - 0
Stage 1 35 -----
Stage 2 53 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 914 1038 1558 - - -
Stage 1 988 -----
Stage 2 970 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 902 1038 1558 - - -
Mov Cap-2 Maneuver 902 -----
Stage 1 975 -----
Stage 2 970 -----
Approach EB NB SB
HCM Ctrl Dly, s/v 8.95 4.64 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1137 - 945 - -
HCM Lane V/C Ratio 0.013 - 0.036 - -
HCM Ctrl Dly (s/v) 7.3 0 9 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
HCM 7th AWSC Plus Project
2: Barrydale St & Le Borgne Ave PM Peak Hour PP
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 2
Intersection
Intersection Delay, s/veh 7.1
Intersection LOS A
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 7 23 25 4 5 4
Future Vol, veh/h 7 23 25 4 5 4
Peak Hour Factor 0.84 0.84 0.84 0.84 0.84 0.84
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 8 27 30 5 6 5
Number of Lanes 011010
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay, s/veh 7.2 7.1 7
HCM LOS A A A
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 23% 0% 56%
Vol Thru, % 77% 86% 0%
Vol Right, % 0% 14% 44%
Sign Control Stop Stop Stop
Traffic Vol by Lane 30 29 9
LT Vol 7 0 5
Through Vol 23 25 0
RT Vol 0 4 4
Lane Flow Rate 36 35 11
Geometry Grp 1 1 1
Degree of Util (X) 0.04 0.037 0.012
Departure Headway (Hd) 4.026 3.898 3.901
Convergence, Y/N Yes Yes Yes
Cap 893 922 917
Service Time 2.035 1.908 1.928
HCM Lane V/C Ratio 0.04 0.038 0.012
HCM Control Delay, s/veh 7.2 7.1 7
HCM Lane LOS A A A
HCM 95th-tile Q 0.1 0.1 0
HCM 7th TWSC Plus Project
3: Puente Ave & Barrydale St PM Peak Hour PP
LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 3
Intersection
Int Delay, s/veh 2.9
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 7 0 33 4 5 56 2 36 1104 12 19 66 586 40 Future Vol, veh/h 7 0 33 4 5 56 2 36 1104 12 19 66 586 40 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None
Storage Length - - - - - - - 100 - - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 -
Grade, % - 0 - - 0 - - - 0 - - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91 91 91 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 8 0 36 4 5 62 2 40 1213 13 21 73 644 44
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 1546 2163 344 1812 2178 613 688 688 0 0 1226 1226 0 0 Stage 1 853 853 - 1303 1303 ---------
Stage 2 693 1310 - 509 875 ---------
Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 6.44 4.14 - - 6.44 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 - - - - - - - - - Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.52 2.22 - - 2.52 2.22 - - Pot Cap-1 Maneuver 78 47 652 49 46 435 526 902 - - 237 564 - - Stage 1 320 374 - 170 229 ---------
Stage 2 400 227 - 515 365 ---------
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 43 34 652 34 33 435 865 865 - - 404 404 - - Mov Cap-2 Maneuver 43 34 - 34 33 ---------
Stage 1 246 287 - 161 218 ---------
Stage 2 319 216 - 374 281 ---------
Approach EB WB NB SB
HCM Control Delay, s/v30.12 42.86 0.31 1.98
HCM LOS D E
Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 865 - - 187 164 404 - -
HCM Lane V/C Ratio 0.048 - - 0.235 0.435 0.231 - -
HCM Control Delay (s/veh) 9.4 - - 30.1 42.9 16.6 - -
HCM Lane LOS A - - D E C - -
HCM 95th %tile Q(veh) 0.2 - - 0.9 2 0.9 - -
HCM 7th TWSC Plus Project
4: Van Wig Ave/Commercial Driveway & Francisquito Ave PM Peak Hour PP LeBorgne Ave VMT & Transportation Study Synchro 12 Report Fehr & Peers Page 4
Intersection
Int Delay, s/veh 3.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 0 934 57 58 758 0 29 0 61 1 0 4
Future Vol, veh/h 0 934 57 58 758 0 29 0 61 1 0 4
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 973 59 60 790 0 30 0 64 1 0 4
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 790 0 0 1032 0 0 1518 1913 516 1397 1943 395 Stage 1 - ----- 1003 1003 - 910 910 -
Stage 2 - - - - - - 516 910 - 486 1032 -
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94 Critical Hdwy Stg 1 - - - - - - 6.54 5.54 - 6.54 5.54 - Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - 6.54 5.54 - Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32 Pot Cap-1 Maneuver 826 - - 669 - - 82 67 504 101 64 604 Stage 1 - - - - - - 260 318 - 295 351 -
Stage 2 - - - - - - 510 351 - 531 308 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 826 - - 669 - - 72 59 504 78 57 604
Mov Cap-2 Maneuver - - - - - - 72 59 - 78 57 -
Stage 1 - - - - - - 260 318 - 261 311 -
Stage 2 - - - - - - 448 311 - 464 308 -
Approach EB WB NB SB
HCM Control Delay, s/v 0 1.79 48.88 19.32
HCM LOS E C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 171 826 - - 256 - - 257
HCM Lane V/C Ratio 0.547 - - - 0.09 - - 0.02
HCM Control Delay (s/veh) 48.9 0 - - 10.9 1.1 - 19.3
HCM Lane LOS E A - - B A - C
HCM 95th %tile Q(veh) 2.8 0 - - 0.3 - - 0.1
P
Appendix D - Signal Warrant Analysis Worksheets
California MUTCD 2014 Edition
(FHW A's MUTCD 2009 Edition, including Revisions 1,2, &3, as amended for use in California) Existing Conditions
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet (Sheet 1 of 5) COUNT DATE Mav 2025 and March 2026
DIST co RTE
Major st: Francisquito Avenue
Minor St: Van Wig Avenue
PM
CALC JEB DATE 3/20/2026
CHK SEB DATE 3/21/2026
Critical Approach Speed
Critical Approach Speed
Speed limit or critical speed on major street traffic> 40 mph ......................... □ or }
In built up area of isolated community of< 10,000 population ..................... . D
RURAL(R)
0 URBAN (U)
mph
mph
Chapter 4C - Traffic Control Signal Needs Studies
Part 4 - Highway Traffic Signals
November 7, 2014
California MUTCD 2014 Edition
(FHW A's MUTCD 2009 Edition, including Revisions 1,2, &3, as amended for use in California) Future Plus Project Conditions
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet (Sheet 1 of 5) COUNT DATE Mav 2025 and March 2026
DIST co RTE
Major st: Francisquito Avenue
Minor St: Van Wig Avenue
PM
CALC JEB DATE 3/20/2026
CHK SEB DATE 3/21/2026
Critical Approach Speed
Critical Approach Speed
Speed limit or critical speed on major street traffic> 40 mph ......................... □ or }
In built up area of isolated community of< 10,000 population ..................... . D
RURAL(R)
0 URBAN (U)
mph
mph
Chapter 4C - Traffic Control Signal Needs Studies
Part 4 - Highway Traffic Signals
November 7, 2014
California MUTCD 2014 Edition
(FHW A's MUTCD 2009 Edition, including Revisions 1,2, &3, as amended for use in California) Existing Conditions
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet (Sheet 1 of 5) COUNT DATE Mav 2025 and March 2026
DIST CO RTE
Major St: Puente Avenue
Minor St: Barrydale Street
PM
CALC JEB DATE 3/20/2026
CHK SEB DATE 3/21/2026
Critical Approach Speed
Critical Approach Speed
Speed limit or critical speed on major street traffic> 40 mph ......................... □ or }
In built up area of isolated community of< 10,000 population ..................... . D
RURAL(R)
0 URBAN (U)
mph
mph
Chapter 4C - Traffic Control Signal Needs Studies
Part 4 - Highway Traffic Signals
November 7, 2014
California MUTCD 2014 Edition
(FHW A's MUTCD 2009 Edition, including Revisions 1,2, &3, as amended for use in California) Future Plus Project Conditions
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet (Sheet 1 of 5) COUNT DATE Mav 2025 and March 2026
DIST CO RTE
Major St: Puente Avenue
Minor St: Barrydale Street
PM
CALC JEB DATE 3/20/2026
CHK SEB DATE 3/21/2026
Critical Approach Speed
Critical Approach Speed
Speed limit or critical speed on major street traffic> 40 mph ......................... □ or }
In built up area of isolated community of< 10,000 population ..................... . D
RURAL(R)
0 URBAN (U)
mph
mph
Chapter 4C - Traffic Control Signal Needs Studies
Part 4 - Highway Traffic Signals
November 7, 2014
Canvass Report - BALDWIN PARK - April 2025 Canvass Report - BASSETT - March 2025Page 299 of 1459 Comments received during public comment period:
Individual/Agency: Comments: Date Received:
1 Samuel Brown In Opposition 8/17/2025
2 Orbach Huff & Henderson Response to Staff Questions in Support
12/12/2025
3 Californians for
Homeownership
Comments on Application in
Support
4/27/26
4 Ynetta Whitley Public Comment made at PC
Meeting in Opposition
2/25/26
5 Yolanda Pompa Public Comment made at PC
Meeting in Opposition
2/25/26
Comments received outside public comment period:
Individual: Comments: Date Received:
1 Robert Schweppe In Support 7/13/26
2 Laura Jara In Support 7/13/26
3 Anastacia Barajas In Support 7/13/26
4 Jose Calderon In Support 7/13/26
5 Salvador Hernandez In Support 7/13/26
6 Rudy Carmona In Support 7/13/26
7 Ruby Gamboa In Support 7/13/26
8 Juan Ramon Alvarez In Support 7/13/26
9 Brenda Lopez In Support 7/13/26
10 Ivan Gonzalez In Support 7/13/26
11 Adrian Juarez In Support 7/13/26
12 Ivonne Garcia In Support 7/13/26
13 Maricela Lopez-Harvin In Support 7/13/26
14 Maria Jaramillo In Support 7/13/26
15 Adrian Otero In Support 7/13/26
16 Ruben Razo In Support 7/13/26
17 Isidro Valles In Support 7/13/26
From: S B
To: [email protected]; [email protected]; Aaron Simental; [email protected]; [email protected]; Alejandro Alvarez; Alexandra Zuniga; Daniel "Danny" Damian; Alejandra Avila; Emmanuel J. Estrada; Manuel Lozano; Manuel Carrillo; Jean M. Ayala; [email protected]; Nick Baldwin; [email protected]; [email protected]; [email protected]; Duardo_Debra; [email protected]; LA County Board of Supervisors Cc: Joseph Carrillo; Arellano, Gustavo; [email protected]; [email protected]; [email protected]; [email protected]; [email protected] Subject: Legal Demand to Cease and Withdraw from Storm Properties Ground Lease — Notice of Impending Litigation Date: Sunday, August 17, 2025 1:06:58 AM
Attachments: Final order of condemnation page 2.pdf
Final order of condemnation page 1.pdf
Some people who received this message don't often get email from [email protected]. Learn why this is important
CAUTION: This email originated from outside of the organization. DO NOT click links or open attachments unless you recognize the sender and know the content is safe. If you are unsure about an attachment or have questions, please contact IT Support.
Complaint Packet: Florence Flanner /
Bassett USD – Storm Properties
Development
Complainant:
Samuel Brown
Phone: 213-973-7285
Email: [email protected]
Cover Letter – Submission of Complaints and Notice of
Intent
Date: August 17, 2025
To:
Superintendent Alejandro Alvarez
Bassett Unified School District
904 N. Willow Avenue
La Puente, CA 91746
CC:
Bassett USD Governing Board
Los Angeles County Office of Education (LACOE)
California Department of Education (CDE)
City of Baldwin Park, Mayor & Council
Los Angeles County District Attorney, Public Integrity Division Re: Complaint Packet — Florence Flanner Property / Storm Properties Ground Lease Dear Superintendent Alvarez and Members of the Governing Board, Enclosed please find multiple complaints and legal demands concerning Bassett USD’s unlawful lease negotiations with Storm Properties regarding the Florence Flanner property and its contiguous lot:
1. Uniform Complaint Procedure (UCP) Complaint — violations of the Naylor Act, CEQA, Brown Act, and language access requirements.
2. Williams Complaint — unsafe and unsanitary conditions at the Florence Flanner site due to illegal dumping of green waste.
3. Naylor Act / CEQA Pre-Litigation Demand — notice that the District has failed to comply with statutory first-offer obligations to the City of Baldwin Park, rendering the ground lease unlawful and voidable.
4. Letter to the City of Baldwin Park — urging the City to assert its statutory first right of refusal under the Naylor Act.
5. Timeline of Events — documenting Bassett USD and Storm Properties actions concerning Florence Flanner.
6. Exhibit E: Final Order of Condemnation — confirming public acquisition and public-purpose status of Florence Flanner property, including contiguous APN lot.
7. Exhibit F: Public Records Act (PRA) Request — for all correspondence and documents related to Storm Properties and Florence Flanner since the last PRA request.
I request that Bassett USD immediately cease further action on the Storm Properties lease, issue proper Naylor Act offers to the City of Baldwin Park, remediate the Florence Flanner site, and comply with all statutory obligations.
Failure to do so will result in litigation seeking writ relief, injunctive relief, and attorneys’ fees under Code of Civil Procedure § 1021.5.
Sincerely,
Samuel Brown
Exhibit A – Uniform Complaint Procedure (UCP)
Complaint
Respondent: Bassett Unified School District
Complainant: Samuel Brown
Allegations
1. Violation of the Naylor Act (Ed. Code §§ 17485–17500):
Bassett USD failed to first offer the Florence Flanner property, including its contiguous APN lot, to the City of Baldwin Park as required by law.
The District’s claim that the lot is separate does not excuse compliance; it remains part of the Florence Flanner site and was acquired and condemned for public school purposes.
2. Violation of CEQA (Pub. Res. Code § 21000 et seq.):
No Environmental Impact Report or equivalent environmental review was conducted prior to lease negotiations with Storm Properties.
3. Violation of the Brown Act (Gov. Code § 54950 et seq.):
The District failed to provide meaningful public notice, withheld lease materials, and selectively restricted public comment.
4. Violation of Education Code § 48985 (Language Access):
Notices, agendas, and documents were not translated into languages spoken by more than 15% of Bassett USD families, particularly Spanish.
Relief Requested
Rescind the Storm Properties lease.
Comply with the Naylor Act by offering the property to Baldwin Park.
Conduct full CEQA review with community input.
Remedy Brown Act violations through properly re-noticed hearings with interpretation/translation.
Exhibit B – Williams Complaint (Facilities)
Complainant: Samuel Brown
Site: Florence Flanner Property, Bassett USD
Allegations
The District has permitted illegal dumping of green waste and debris on school property.
This creates unsafe, unsanitary, and hazardous conditions for students in the early childhood program, staff, and community.
Bassett USD has failed to secure the site, compounding health and safety risks.
Relief Requested
Immediate cleanup and remediation of the Florence Flanner site.
Secure fencing and monitoring to prevent future dumping.
Compliance report submitted to LACOE and CDE.
Exhibit C – Naylor Act / CEQA Pre-Litigation Demand
To: Bassett Unified School District
From: Samuel Brown
Date: August 17, 2025
Allegations
Bassett USD violated the Naylor Act (Ed. Code §§ 17485–17500) by failing to first offer the Florence Flanner property, including the contiguous lot under a separate APN, to the City of Baldwin Park.
Any ground lease with Storm Properties is voidable until full compliance is achieved.
Bassett USD violated CEQA by entering lease negotiations before environmental review and entitlement approvals.
Demand
Rescind or suspend the lease pending statutory compliance.
Issue a first-offer notice to the City of Baldwin Park.
Prepare and circulate a full Environmental Impact Report (EIR).
Re-notice hearings and public engagement with translated materials.
Failure to comply will result in litigation seeking writ relief, injunction, and attorneys’ fees under CCP § 1021.5.
Exhibit D – Enforcement Letter to City of Baldwin Park
Date: August 17, 2025
To: Mayor and Council, City of Baldwin Park
From: Samuel Brown
Re: Enforcement of Naylor Act Rights — Florence Flanner Property
Dear Mayor and Council,
The Florence Flanner property lies within your jurisdiction. Under the Naylor Act (Ed. Code §§ 17485–17500), Bassett USD is required to first offer surplus school property for park and recreational purposes to the city in which the property is located.
Bassett USD has instead pursued a ground lease with Storm Properties, bypassing Baldwin Park’s statutory right of first refusal. This failure renders the lease unlawful and voidable.
We request that Baldwin Park immediately assert its rights under the Naylor Act and demand formal offer of the Florence Flanner property, including the contiguous APN lot.
Sincerely,
Samuel Brown
Exhibit E – Timeline of Events
1960s–1970s: Florence Flanner property acquired and condemned for public school use. 1970s–2000s: Site operated as a Bassett USD school.
2010s: Transitioned to early childhood development programs. 2023: Bassett USD identifies surplus property, including the contiguous APN lot. 2024: Bassett USD enters lease negotiations with Storm Properties.
Sept. 12, 2024: Bassett USD meeting restricts public comment; community raises Brown Act objections.
Jan. 14, 2025: Selective enforcement of speaker rules at board meeting.
Spring 2025: Illegal dumping reported at Florence Flanner property.
Summer 2025: Draft ground lease with Storm Properties surfaces.
Aug. 17, 2025: Complaint Packet submitted to Bassett USD, CDE, LACOE, DA, and City of Baldwin Park.
Exhibit F – Final Order of Condemnation
(Attached: Final Order of Condemnation, confirming public-purpose acquisition of Florence Flanner property, including contiguous APN lot.)
Exhibit G – Public Records Act (PRA) Request
To: Bassett Unified School District
From: Samuel Brown
Date: August 17, 2025
Pursuant to the California Public Records Act (Gov. Code §§ 7920.000–7931.000), I request the following records:
1. All correspondence, letters, emails, and documents exchanged between Bassett USD, Storm Properties, and any consultants, regarding the Florence Flanner property (including contiguous APN lot), from the date of the last PRA request to the present.
2. Copies of all drafts of the ground lease agreement with Storm Properties.
3. Any CEQA-related studies, staff reports, or environmental assessments regarding the Florence Flanner property.
4. All communications with the City of Baldwin Park concerning the Florence Flanner property and/or Naylor Act obligations.
Please provide these records electronically. If you withhold any records, please provide a privilege log identifying the legal justification for each withholding.
Sincerely,
Samuel Brown
Proof of Service
I, Samuel Brown, declare as follows:
On August 17, 2025, I served the foregoing Complaint Packet: Florence Flanner / Bassett USD – Storm Properties Development by the following method(s):
Email to: Superintendent Alejandro Alvarez; Bassett USD Governing Board; LACOE; CDE; Baldwin Park Mayor & Council; Los Angeles County District Attorney Public Integrity Division.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Executed on August 17, 2025 at Bassett, California.
Signature: /s/
Name: Samuel Brown
TREEL W
INAGIBINE DIMINT
008117,
Palat118, ??. 700104
4926
2 "NO CERTIPICO) GOPY IS GIVEN FREE DE CHARGE
L'UANT TO LIW SOLELY UPON THE CUINDI.
AVE ENENS HENRITO DETERMINE EUGILIUTY FOR
7 THE DOCUMENT TO WHICH TIS CERTIFICATE I$ AT,
TACHED IS A FULI, TRUE AND COF PECT COPY ON IH?
OFIGINAL ON FILE AND OF RECCHIO IN MY OFFICE.
SAME HAVING BEEN FILED... ???. 6957
AND ENTERED ...... 209. 4455y
ATTESTA BOOT PAGE... In...
ATTEST ..... 19.457
HAROLD L. OSILY
Court of tho Siate ol Califormo, in and
Senty of Lie legales.
.... DEPUTY
IN THE SUMINICO CO 08I THI STATT CALIFORNIA
10 11
12 13
14 16
16 17
18 19
20 21
22 23
24 25
28 27
28 29
30 31
32 (?????? ?)
la Intoriloratary foderani binste boos baratoloro solo ela "strand ti tain set100, onodennias Parool 1, as descritod la tho Complitat lorois, anl aijuigias anl deoroodng tha anomat to la pasa to tan entiondent ost:l821d thoporo, on 11180 10158 100 Ita boratly. a16 1'901 lAViAR bool Mula to tho Instataation os tho sonet thai natal unorni has boos pald la tho masanr proviand asd chet plasmiati In linaroforo entitlol to lavo a filial arbor al sondoanation barilla 1n ancordanno vita tho tonna and mortasons al nala juulgant. u162 any and all lapromento Sherson, bo and lão sano la hepoligr ANnIDaDOR la prAyod fOP, and thas tha pla1atAlI RADBUT! DOlORE.
DISTRICT CI LOS ANARLES COUITY Cora CaDo Del angusTo sho son alliplo Eiltlo la and to sala Mriparty sso sabllo perporoo, nanoly, lor libe BIN ApPArtINARONO tRAPITO, anA 801' MÁy aklin uno anthortand by Int,
RECORDED IN
OFFICIAL RECORDS
LOS ANGELES CCUNTY. CALIF.
RAY E LEE. RECORDER
1959 OCT 9 PM 4: 15
???? property inlag locatod in the Chanty el los angolos, Ninto ne 2 8
5 6.
7 8
10 Tant fortion el lote 18 lnd D8 of 81 Monto Valuat 12n010, la sho county of los Angelos, state ol dalifollo, do saron 110 000 resardiod la bood 0, posa 208 o8 1191, In tha o18200 al the aranty revarder of sald cornty, Coperlim as tollara:
Bogluming at a polnt in the sonthsasterly 1100 al anid
lot 1, bolsa a polat: lu tho nestlmsarenly 1176 l 19808 No, 19388, ?? ??? ??? ???????? 1n ???? ?3?, 1????? 8?, ?0 ??? ?? 0? ???? ????,
1.2 13
1%
15 16.
17 18
19 20
21 22
22 24
2:5
25 27
28 29
30 31
82 1500 DOLas the vontinatarly ¿lno 11 Prasalagulto Avenue, 80 1not "110, an neon on sald InDi Charos parallal "181 an18 seethan tarly
11.00 North 68*00°380 Vent 81 B.18 8108, «880 08 BOD0, 80 500 s0181. 1886, 25 ?? MI. 9378, In book 4817%, sORo 138 oll Midas101 Basepós of suld countillo sale norilmatarly llas boles a surro Bentlentarly alone undil eurmed rantennaderly lizo 1182,50:110081 theres contimilng southIestarly alas uslA southanararly dare me Renant to s91d surro 17.11 leot, naso or 1031, tO the 1108k302 dr ?E TRAI MAD OR NALA NPINS AS SATANI A PARTINE ANd LONETA Of HOPI:A Do 18' son Vent 886.17 14081 thanan sinns nald northarly 1120 (nal loot nare or loan, to the southontarly line of nald loll 18, thisco alone sald southorotarly 11500 01 Sato 10 and 80, Herth 61098-461 Inat 118.08 root to sha prant of loglandas.
Tho clank su ped in antor this final order.
DAXED! 4.355 1954.
HE sat thart
????
18: 1
9-28-5
Writer's E-Mail: [email protected]
Writer's Direct Dial: (310) 228-2082
File Number
4752.002
December 12, 2025
VIA E-MAIL ONLY
City of Baldwin Park
Attn: Nick Baldwin, City Planner
14403 E Pacific Av
Baldwin Park, CA 91706
Telephone: (626) 960-4011, ext. 475
Email: [email protected]
Re: Bassett Unified School District Response to City of Baldwin Park Regarding General Plan Amendment 25-01; Zone Change Z 25-01; Zone Variance 25-02; Design Review PR 25-17; Administrative Adjustment AA 25-02; and Lot Line Adjustment; APN: 8558-023-910 Baldwin Park, CA 91706
Dear Mr. Baldwin,
On behalf of the Bassett Unified School District (“District”), our firm submits these responses to the City of Baldwin Park’s (“City”) November 5, 2025, correspondence to Storm Properties, Inc. (“Storm”) regarding the Bassett Villas at Baldwin Park Project (“Joint Occupancy Project” or “Project”).
1. Outreach and Project Selection
The District conducted a multi-year procurement process for the Joint Occupancy Project at the Florence Flanner property (“Property” or “School”), beginning in 2022. a. Procedures and Outreach
The District complied with all necessary procedures and engaged in thorough outreach activities to ensure the Project is planned and implemented to provide the greatest possible benefit to all parties involved and affected. Some of those activities included the following:
Attorneys at Law
www.ohhlegal.com
1901 Avenue of the Stars, Suite 575
Los Angeles, CA 90067
6200 Stoneridge Mall Road, Suite 225
Pleasanton, CA 94588
2877 Historic Decatur Road, Suite 200
San Diego, CA 92106
13181 Crossroads Parkway N., Suite 170
City of Industry, CA 91746
650 Lighthouse Avenue, Suite 240
Pacific Grove, CA 93950
333 City Blvd. West, Suite 1700
Orange, CA 92868
3600 Lime Street., Building 2 Office #218
Riverside, CA 92507
December 12, 2025
April 2022 - June 2024 – The District conducted five closed and two open sessions. During open session presentations, the Joint Occupancy statutes and procedures were reviewed with the Board and for the community’s benefit. (Link to May 24, 2022, open session presentation:
https://simbli.eboardsolutions.com/Meetings/Attachment.aspx?S=36030837&AID=269956&MI D=10684; link to October 25, 2022, open session presentation:
https://www.dropbox.com/scl/fi/v431zhp5buzm6q0etau68/2022-10-25-Joint-Occupancy-Presentation-TG-rev.pptx?rlkey=d66pavwy3ds1d5yq3gm148vnr&st=1pap2evd&dl=0) October 25, 2022 – The Board approved a resolution of intention to issue a Request for Qualifications/Proposals (“RFQ/P”) for joint occupancy development of the Property. (Link to resolution:
https://simbli.eboardsolutions.com/Meetings/Attachment.aspx?S=36030837&AID=365703&MI D=16007)
March 13, 2023 – The District issued the RFQ/P.
September 12, 2023 – The Board adopted a resolution authorizing negotiation of an exclusive negotiating agreement with Storm Properties and declaring the Property exempt surplus land. (Link to resolution:
https://simbli.eboardsolutions.com/Meetings/Attachment.aspx?S=36030837&AID=596050&MI D=23571)
After the Storm proposal was selected, the District and Storm complied with all necessary procedures and engaged in thorough outreach activities to ensure the Project is planned and implemented to provide the greatest possible benefit to all parties involved and affected.
February 15, 2024 – Storm presented the Project to the Mayor, City Manager, and Community Development Director.
February 23, 2024 – The District and Storm entered into the Exclusive Negotiating Agreement.
March 21, 2024 – Storm submitted the pre-application to the City to confirm the Project’s alignment with the City’s and community’s goals.
April 3, 2024 – Storm made an informational presentation to the City Council.
December 18, 2024 – Storm held a community outreach/informational presentation meeting to receive feedback and discuss potential concerns. Adjustments to the preliminary site plan were subsequently made in response to community feedback.
December 12, 2025
January 17, 2025 – Storm presented the Project to the Office of Los Angeles County Supervisor Hilda Solis and her staff. Review of the Project by the Fire Department and incorporation of requested safety measures. The County Public Works Department submitted comments regarding circulation and access.
March 18, 2025 – Storm held a second community outreach meeting/informational presentation to the community. More adjustments were made to the site plan that was being developed based on feedback received.
May 29, 2025 – Storm submitted the entitlement application, which is currently under review.
Based on these steps and the scope of the outreach conducted, the Project appropriately reflects and incorporates the community’s needs.
b. Project Selection
The Board selected the current Project for several reasons, primarily including, but not limited to:
• Long-term, stable revenue: The ground lease and joint occupancy structure will provide the District with long-term, stable revenue to support and improve educational programs and facilities needs without the type of restrictions that accompany funds derived from other types of dispositions of school district property (e.g., sale of surplus property). • Enrollment and under-utilization: The District, like many in California, has experienced ongoing declining enrollment, resulting in excess and under-utilized sites and site capacity.
Repurposing under-utilized sites for residential uses benefits the District, surrounding neighborhood, and broader community.
• Multifamily housing as best use: The proposed size and style of the Project (104 market rate multifamily units) provide the City with necessary family-oriented housing, which may also lead to increased District enrollment and further support for District programs.
Further, this use constitutes the highest and best use of the Property. • District ownership and control: Lastly, through the joint occupancy framework, the District:
◦ Retains ownership (and some control) of the Property, ◦ Continues beneficial community recreational opportunities (pocket park), and ◦ Increases local economic activity from new residents.
All meetings may be cross-referenced through the District’s YouTube channel here:
https://www.youtube.com/@superintendentsoffice3126/streams.
2. Building numbers will be provided on a Site Plan to assist with building identification.
December 12, 2025
3. Campus Fencing and Security
The District acknowledges that the driveway connecting the Project to Millbury Avenue and Le Borne Avenue is within the School’s existing perimeter, and that the existing fences and gates that now secure the School will be modified or removed to create the necessary driveway connection.
The District consents to any reconfiguration necessary and reasonable to accommodate the Project’s connection to Millbury Avenue and Le Borne Avenue.
4. Public Park
The District has no legal obligation to provide a public park alongside the Project. However, in response to community input, the District and Storm are working together to incorporate a publicly accessible “pocket park” as part of the Project. The park will include such features as a trellis, sitting area, open play/sitting area, and walking path.
Very truly yours,
ORBACH HUFF & HENDERSON LLP
Sarine A. Abrahamian
SAA:OHH
MATTHEW GELFAND
SUPERVISING COUNSEL
[email protected]
TEL: (213) 739-8206
FOR REVIEW AND PLACEMENT IN APPLICATION FILE
To Local Agency Staff:
Californians for Homeownership is a 501(c)(3) organization devoted to using legal tools to address California’s housing crisis. We request that the letter included below be considered in connection with an Application1 that appears to be governed by the Housing Accountability Act, Government Code Section 65589.5. The address or application number associated with the Application is identified in the cover email or letter you received with this letter. For the purposes of Government Code Section 65589.5(k)(2), this letter constitutes our written comments on the application. We specifically request that you take the following actions with respect to this letter:
1. Place the letter in your agency’s official file for the Application.
2. Provide the letter to any official, hearing officer, public body, or other public agency charged with reviewing or making any determination regarding the Application or the development to which it relates.
3. Publish the letter in the same manner you would publish other public correspondence received in advance of a public hearing regarding the Application or the development to which it relates.
4. Provide notice at [email protected] regarding the Application or the development to which it relates, as required by Government Code section 65092.
5. Ensure that this letter is included in the administrative record in any litigation concerning the Application or the development to which it relates. * * *
To the Reviewing Official, Hearing Officer, or Public Body:
We are writing regarding an application to develop a residential or mixed-use project that includes two or more residential units. Your approval of this project is governed by the Housing Accountability Act (HAA).
1 All references to the “Application” in this letter include any subsequent formal application if the Application is a preliminary application, any subsequent, amended, or related application, and any application for an ancillary or related permit concerning the development to which the Application relates.
The HAA generally requires you to approve a housing development project unless the project fails to comply with “applicable, objective general plan, zoning, and subdivision standards and criteria, including design review standards, in effect at the time that the application was deemed complete.” Gov. Code § 65589.5(j)(1). To count as “objective,” a standard must “involve[e] no personal or subjective judgment by a public official and be[] uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official.” Gov. Code § 65589.5(h)(9). In making this determination, you must approve the project if the evidence “would allow a reasonable person to conclude” that the project met the relevant standard. Gov. Code § 65589.5(f)(4).
Projects subject to modified standards pursuant to a density bonus are judged against the standards as modified. Gov. Code § 65589.5(j)(3). The courts interpret these provisions broadly to mandate approval. California Renters Legal Advocacy & Education Fund v. City of San Mateo (2021) 68 Cal.App.5th 820, 830.
A “disapproval” under the HAA includes not only the failure to approve an application or a necessary land use approval for the project, but also the failure to comply with specified time periods, the failure to comply with SB 330’s five hearing limit (Gov. Code § 65905.5), the failure to cease conduct “undertaken for an improper purpose” that “effectively disapproves” the project, and the failure to make a CEQA exemption determination or to adopt or approve a CEQA document. Gov. Code §§ 65589.5(h)(6), 65589.5.1, 65589.5.2. The inclusion of an improper item in an incompleteness determination under the Permit Streamlining Act also constitutes a denial.
Gov. Code § 65589.5(h)(6)(G). And for most purposes, the HAA treats the imposition of a “condition that the project be developed at a lower density” or a condition that renders the project infeasible as the equivalent of a disapproval. Gov. Code §§ 65589.5(d), (j).
Your agency is subject to strict timing requirements under the HAA. If it desires to find that a project is inconsistent with any of its land use standards, it must issue written findings to that effect within 30 to 60 days after a legally complete application is received from the applicant; the ultimate date of your agency’s completeness determination is irrelevant. Gov. Code §§ 65589.5(j)(2)(A), (h)(1). If the applicant has not been timely notified of a purported inconsistency with a local standard, the project is deemed consistent with that standard, and you are permanently foreclosed from determining otherwise. Gov. Code § 65589.5(j)(2)(B).
If your agency has determined that a project is consistent with its objective standards, or the project is deemed consistent with such standards, but you nevertheless propose to reject it, you must make written findings, supported by a preponderance of the evidence, that the project would have a “specific, adverse impact upon the public health or safety,” meaning that the project would have “a significant, quantifiable, direct, and unavoidable impact, based on objective, identified written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete.” Gov. Code § 65589.5(j)(1)(A); see Gov. Code § 65589.5(k)(1)(A)(i)(II). Once again, “objective” means “involving no personal or subjective judgment by a public official and being uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official.” Gov. Code § 65589.5(h)(9).
Even if you are able to identify legally sufficient health and safety concerns about a project, you may only reject the project if “[t]here is no feasible method to satisfactorily mitigate or avoid the adverse impact . . . other than the disapproval of the housing development project or the approval of the project upon the condition that it be developed at a lower density.” Gov. Code § 65589.5(j)(1)(B). Thus, before rejecting a project, you must consider every conceivable, reasonable measure that could be used to mitigate the impact at issue. At a minimum, you must direct staff to prepare an exhaustive list of potential mitigations based on their professional expertise, and you must review each of these for feasibility. Because your agency must affirmatively prove that no feasible mitigation exists in order to lawfully reject a project, you may not reject a project merely because the applicant has failed to come forward an acceptable mitigation measure; that is your job, not theirs.
The HAA applies to the full range of housing types, including a project to build two or more single-family homes, a project to build a single-family home with an accessory dwelling unit, multifamily projects (both market-rate and income-limited), and mixed-use developments. Gov.
Code § 65589.5(h)(2); see Honchariw v. Cty. of Stanislaus, 200 Cal. App. 4th 1066, 1074-76 (2011). And the Legislature has directed that the HAA be “interpreted and implemented in a manner to afford the fullest possible weight to the interest of, and the approval and provision of, housing.” Gov. Code § 65589.5(a)(2)(L).
If your agency is out of compliance with the law governing general plan housing elements, it is subject to the “builder’s remedy” provisions in the HAA, which further restrict its ability to disapprove qualifying developments. Gov. Code § 65589.5(f)(6). Your agency may be subject to the builder’s remedy even if its compliance has been certified by the California Department of Housing and Community Development (HCD), if a court later determines that it was actually out of substantial compliance during the period it received a preliminary application or complete application for a qualifying project. For example, your agency may be out of compliance for failing to follow state law provisions restricting lower-income housing site zoning, notwithstanding certification by HCD. New Commune DTLA LLC v. City of Redondo Beach (2025) 115 Cal.App.5th 111, review denied.
When a locality rejects or downsizes a housing development without complying with the rules described above, the action may be challenged in a writ of mandate action. Gov. Code § 65589.5(m). The legislature has significantly reformed this process over the last decade in an effort to increase compliance. Today, a non-profit organization like Californians for Homeownership can sue without the consent of the project applicant, to protect the public’s interest in the development of new housing. A local agency that is sued to enforce the HAA must prepare the administrative record itself, at its own expense, within 30 days after service of the petition.
Gov. Code § 65589.5(m). And if an enforcement lawsuit brought by a non-profit organization is successful, the locality must pay the organization’s attorneys’ fees. Gov. Code § 65589.5(k)(2).
In certain cases, the court will also impose fines that start at $10,000 per proposed housing unit.
Gov. Code § 65589.5(k)(1)(B). If a locality has previously been notified by the Attorney General or HCD that an action or inaction would violate a housing reform law, a court must impose at least the minimum fine amount, and if it is a repeating violation, the fine will be quintupled. Gov. Code
§ 65914.2. An applicant cannot be required to indemnify a locality for costs related to litigation under the HAA. Gov. Code § 65914.2(c)(1).
An action brought by an applicant challenging a denial is subject to an expedited judicial review process, with shorter time given to certify the administrative record, and calendar preference in both the trial court and on appeal. C.C.P. § 1094.9.
In recent years, there have been a number of successful lawsuits to enforce the HAA:
• In Eden Housing, Inc. v. Town of Los Gatos, Santa Clara County Superior Court Case No. 16CV300733, the court determined that Los Gatos had improperly denied a subdivision application based on subjective factors. The court found that the factors cited by the town, such as the quality of the site design, the unit mix, and the anticipated cost of the units, were not objective because they did not refer to specific, mandatory criteria to which the applicant could conform. • San Francisco Bay Area Renters Federation v. Berkeley City Council, Alameda County Superior Court Case No. RG16834448, was the final in a series of cases relating to Berkeley’s denial of an application to build three single family homes and its pretextual denial of a demolition permit to enable the project. The Court ordered the city to approve the project and to pay $44,000 in attorneys’ fees. • In 40 Main Street Offices v. City of Los Altos, Santa Clara County Superior Court Consolidated Case Nos. 19CV349845 & 19CV350422, the court determined that Los Altos violated the HAA, among other state housing laws, by failing to identify objective land use criteria to justify denying a mixed-use residential and commercial project. After the City was ordered to pay a $7 million bond, it dropped its appeal in the case. The City was ultimately forced to pay approximately $1 million in delay compensation and attorneys’ fees.
• In Ruegg & Ellsworth v. City of Berkeley, Alameda County Superior Court Case No. RG18930003, after the Court of Appeal held that Berkeley had violated state law by denying a 135-unit mixed-use project, the trial court determined that the denial constituted a violation of the HAA. As a result of the HAA violation, the City was responsible for approximately $4 in attorneys’ fees and penalties. • In California Renters Legal Advocacy & Education Fund v. City of San Mateo (2021) 68 Cal.App.5th 820, the Court of Appeal held that San Mateo had improperly applied subjective criteria in denying a housing development project.
The City ultimately agreed to pay $450,000 in the petitioner’s attorneys’ fees. • In Californians for Homeownership v. City of Huntington Beach, Orange County Superior Court Case No. 30-2019-01107760-CU-WM-CJC, the court ruled that Huntington Beach violated the HAA when it rejected a 48-unit condominium
project based on vague concerns about health and safety. Following the decision, the City agreed to pay a total of $600,000 in attorneys’ fees to our organization and two other plaintiffs.
• In Yes In My Back Yard, et al. v. City of Los Angeles, L.A.S.C. Case No. 21STCP03883, the court ruled that Los Angeles violated the HAA in denying a housing development, and ordered the city to pay approximately $240,000 in attorneys’ fees.
• In Janet Jha v. City of Los Angeles, L.A.S.C. Case No. 23STCP03499, the court held that Los Angeles violated the HAA by refusing to process a housing development application based on its erroneous interpretation of state law. After the Court ordered the city to pay a $7.4 million bond, the city abandoned its appeal.
The city was ordered to pay approximately $120,000 in attorneys’ fees. • In a series of three cases against the City of Los Angeles, L.A.S.C. Case Nos. 24STCP00524, 24STCP00070, and 24STCP00385, three different trial court judges determined that Los Angeles had violated the HAA by refusing to comply with the terms of its own affordable housing streamlining policy. Between the three cases, the city was ordered to pay over $350,000 in attorneys’ fees. • In Yes in My Back Yard v. City of Los Angeles, Los Angeles County Superior Court Case No. 24STCP00524, the court ruled that the City’s finding that an application was incomplete constituted a disapproval under the HAA. The City was ordered to pay over $90,000 in attorneys’ fees.
• In District Square LLC v. City of Los Angeles, L.A.S.C. Case No. 20STCP00654, and Cesar Chavez 888, LLC v. City of Los Angeles et al., L.A.S.C. Case No. 24STCP01880, the court determined that the city’s purported “health and safety findings” for denying two housing development projects did not meet the requirements in the HAA, determined that the City had acted deliberately and in bad faith, and ordered the projects approved. In the Cesar Chavez 888 matter, the court ordered the city to pay approximately $170,000 in attorneys’ fees. • In 600 Foothill Owner, LP v. City of La Cañada Flintridge, et al. and California Housing Defense Fund v. City of La Cañada Flintridge, et al., Los Angeles Superior Court Case Nos. 23STCP02575 and 23STCP02614, the trial court determined that the City of La Cañada Flintridge had unlawfully rejected a project subject to the HAA. After the City was ordered to pay a $14 million bond, it abandoned its appeal and agreed to pay California Housing Defense Fund nearly $1.3 million in attorneys’ fees. A further fee settlement in the millions of dollars is expected with the applicant, and the city has paid its own attorneys over $2 million to litigate the case.
We urge you to comply with the HAA as you review this project.
Sincerely,
Matthew Gelfand
Writer's Email: [email protected]
Writer's Direct Dial: (626) 696-0075
File Number
4752.002
July 15, 2026
VIA ELECTRONIC MAIL
City of Baldwin Park
Attn: Nick Baldwin, City Planner
14403 E Pacific Avenue
Baldwin Park, CA 91706
Telephone: (626) 960-4011, ext. 475
Email: [email protected]
Re: Bassett Unified School District’s Responses to City’s Request for Information Regarding the Bassett Villas at Baldwin Park Project
Dear Mr. Baldwin:
We write on behalf of the Bassett Unified School District (“District”) to provide the City with information in response to the City’s July 14, 2026, inquiry regarding the Bassett Villas at Baldwin Park Project (“Project”) at the former Florence Flanner Elementary School site, located at 1314 Leborgne Street, La Puente, California 91746 (“Site”). Specifically, this letter responds to the City’s request for supplemental information regarding the District’s and Project’s compliance with, or applicability of, certain statutes.
I. Response 7.7 – The District May Jointly Develop the Site for Residential Use The District procured the Project under the Joint Occupancy Statutes (Ed. Code, § 17515 et seq.), as reflected in the Board action taken on October 25, 2022. These sections authorize the District to ground lease the Site for residential development while retaining ownership and a continued interest in the Site. Consistent with this authority, the District is not selling or relinquishing ownership of the Site. Instead, the Project would generate long-term lease revenue that may be used without restriction to support District goals and operations, including, for example, educational programs, facilities maintenance, and the hiring and retaining teachers and staff.
Whether the Site was originally acquired or previously used for educational purposes does not prevent the District from pursuing a legal joint occupancy use that continues to support the District’s educational mission in compliance with the Education Code.
Consistent with the Education Code, the District initiated evaluation of the Site to assess potential uses and recommend options to the District’s governing board (“Board”). After the Board Attorneys at Law
www.ohhlegal.com
1901 Avenue of the Stars, Suite 575
Los Angeles, CA 90067
6200 Stoneridge Mall Road, Suite 225
Pleasanton, CA 94588
2877 Historic Decatur Road, Suite 200
San Diego, CA 92106
13181 Crossroads Parkway N., Suite 170
City of Industry, CA 91746
650 Lighthouse Avenue, Suite 240
Pacific Grove, CA 93950
333 City Blvd. West, Suite 1700
Orange, CA 92868
3600 Lime Street., Building 2 Office #218
Riverside, CA 92507
July 15, 2026
deliberated and decided on the path forward, it authorized issuance of a request for proposals to evaluate joint occupancy development opportunities on March 13, 2023. The Board accepted Storm Properties, Inc.’s (“Storm”) proposal because it most closely aligned with the District’s and community’s needs. Since then, the District has been working with Storm, City staff, and the community to develop the Project in a manner that provides the greatest possible benefit to the District, surrounding residents, and the broader community, including the inclusion of a public park facility.
Public school districts across the nation, the state, and locally are experiencing a drastic decline in student enrollment. This decline is attributable to several factors, including declining birth rates, reductions in kindergarten class sizes, and families leaving California. The District has not been immune, having experienced its peak average daily attendance in the 2000-2001 school year, with enrollment consistently declining since that time. It is because of this, and the associated reduction in state funds, that the District has had to explore alternative revenue-generating uses for the Site to serve the District’s educational mission.
II. Response 18.3 – The Naylor Act Does Not Apply
The Naylor Act applies where a school district disposes of surplus real property pursuant to a specific statutory framework in which all or a portion of a property, over the last eight (8) years or more from when the District determined to sell or lease, consists of land used for a school playground, playing field, other outdoor recreational purposes, or qualifying open space. Further, there must not be any other publicly owned land available in the vicinity that is adequate to meet the community’s recreational and open-space needs. (Ed. Code, § 17486.) Such is not the case here, as the Site has not been used as a school playground, playing field, for other outdoor recreational purposes, or open space for the previous eight (8) years—it has been sitting vacant for quite some time - and there are recreational facilities available for the community’s use. Further, Storm is building a park on the site that would offer additional recreational opportunities for the community and students of the District.
III. Response 18.4 – The District Complied With the Surplus Land Act (“SLA”) Although the SLA generally governs local agency property dispositions, projects undertaken pursuant to the Joint Occupancy Statutes are expressly exempt pursuant to Government Code section 54221. The Board determined that the Property constitutes exempt surplus land because it is being developed pursuant to Education Code section 17515 et seq. It then adopted the SLA exemption resolution on September 12, 2023, attached hereto as Exhibit A. On December 1, 2023, the California Department of Housing and Community Development (“HCD”) confirmed that the Site is exempt surplus land, as reflected in the correspondence attached hereto as Exhibit B. The District has therefore completed the applicable SLA review and confirmation process.
IV. Response 18.11 – Naylor and the SLA Do Not Intersect with CEQA and No EIR
July 15, 2026
Is Required
As previously addressed, the Naylor Act does not apply because the statutory prerequisites set forth by Education Code section 17486 are not satisfied. Further, the District determined via Board Resolution No. 012-24, that the Site constitutes exempt surplus land because it is being developed pursuant to the Joint Occupancy Statutes. HCD confirmed the same on December 1, 2023.
Accordingly, the District complied with all applicable statutory schemes in its pursuit of the Project. As such, neither the Naylor Act nor the SLA intersects with the requirements of CEQA in this context.
V. Conclusion
The District has continued to follow all applicable legal and administrative procedures, including applicable provisions of the Education Code, SLA, CEQA, Naylor Act, and the City’s Municipal Code. Consistent with these frameworks, the District would like to reiterate that the Site is being developed for the ultimate benefit of District students, which includes the District’s continued joint occupancy use of the Site. Therefore, neither the SLA nor the Naylor Act are implicated.
Very truly yours,
ORBACH HUFF & HENDERSON LLP
___________________________________
SAA:OHH Reza Mohamadzadeh
July 15, 2026
ExhibitA
July 15, 2026
Exhibit B
SLA000195
STATE OF CALIFORNIA - BUSINESS, CONSUMER SERVICES AND HOUSING AGENCY GAVIN NEWSOM., Governor
DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT
DIVISION OF HOUSING POLICY DEVELOPMENT
2020 W. El Camino Avenue, Suite 500
Sacramento, CA 95833
(916) 263-2911 / FAX (916) 263-7453
www.hcd.ca.gov
December 1, 2023
Alejandro Alvarez
Bassett Unified School District
904 Willow Avenue
La Puente, CA 91746
Dear Alejandro Alvarez:
RE: HCD’s Review of the Bassett Unified School District’s Resolution No.012-24 Declaring 1314 N. Leborgne Street, La Puente, CA 91746 as “Exempt Surplus Land”
Thank you for notifying the California Department of Housing and Community Development (HCD) of the Bassett Unified School District’s (District) determination of 1314 N. Leborgne Street, La Puente, California 91746 (Property) as “exempt surplus land.” HCD reviewed Resolution No. 012-24 (Resolution) pursuant to Section 400 of the Surplus Land Act Guidelines. As explained below, HCD finds that the Property qualifies as “exempt surplus land” under Government Code section 54221, subdivision (f)(1)(I).
Analysis
According to the Resolution, the Property is surplus to the District’s needs, and is “excess real property” pursuant to Education Code section 17515.
Conclusion
HCD finds that the District’s Property qualifies as “exempt surplus land” under Government Code section 54221, subdivision (f)(1)(I). The District is permitted to proceed with the disposition of the District’s Property as described in the Resolution.
If you have any questions or need additional technical assistance, please contact Helen Morales, Housing Policy Specialist, at [email protected].
Sincerely,
Laura Nunn
Senior Manager, Housing Accountability Unit
Housing Policy Development
Exhibit 9
Final - Initial Study-Mitigated Negative Declaration available at: https://www.baldwinpark.com/ DocumentCenter/View/5102/2026-7-16-Bassett-Villas_1314-LeBorgne-Ave_Final-IS-MND
Vicinity Map
BASSETT VILLAS
PHONE: PHONE: JOB:
BASSETT VILLAS BALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
10.12.26 2310
APPLICANT:
STORM PROPERTIES, INC.
970 W. 190TH STREET, SUITE 995
TORRANCE, CA 90502
CONTACT: STORM BIRD
[email protected]
(310) 986-2102
SHEET INDEX:
T-1 TITLE SHEET
A.0.1 SITE PLAN
A.0.2 OPEN SPACE EXHIBIT
A.0.3 FIRE ACCESS PLAN
A.0.4 TRASH EXHIBIT
A.0.5 EXISTING SITE PHOTOS
A.2.1 FLOOR PLANS - UNITS 1, 1X & 2A
A.2.2 FLOOR PLANS - UNITS 2AX & 2B
A.3.1 BUILDING 2 - FLOOR & ROOF PLANS
A.3.2 BUILDING 2 - ELEVATIONS
A.3.3 BUILDING 4 - FLOOR PLANS
A.3.4 BUILDING 4 - ELEVATIONS
A.3.5 BUILDING 5 - FLOOR PLANS
A.3.6 BUILDING 5 - ELEVATIONS
A.3.7 BUILDING 6 - FLOOR PLANS
A.3.8 BUILDING 6 - ELEVATIONS
A.3.9 BUILDING 4L - FLOOR PLANS
A.3.10 BUILDING 4L - ELEVATIONS
A.3.11 BUILDING 5L - FLOOR PLANS
A.3.12 BUILDING 5L - ELEVATIONS
A.3.13 BUILDING 6L - FLOOR PLANS
A.3.14 BUILDING 6L- ELEVATIONS
A.3.15 BUILDING 5D - FLOOR PLANS
A.3.16 BUILDING 5D - ELEVATIONS
A.4.1 COLOR AND MATERIALS
A.5.1 REC BUILDING
A.5.2 MAINTENANCE BUILDING
LANDSCAPE :
SUMMERS/MURPHY & PARTNERS, INC.
34197 COAST HWY SUITE 200
DANA POINT, CA 92629
CONTACT: MIKE MANN
[email protected]
(949) 443-1446 X 235
TITLE SHEET
ARCHITECTURE T-1
LANDSCAPE:
L-1 PRELIMINARY LANDSCAPE PLAN
L-2 PRELIMINARY ENTRY PLAN ENLARGEMENT
L-3 PRELIMINARY PARK PLAN ENLARGEMENT
L-4 PRELIMINARY PASEO ENLARGEMENT
L-5 PRELIMINARY PASEO ENLARGEMENT
L-6 PRELIMINARY WALL AND FENCE PLAN
L-7 PRELIMINARY WALL AND FENCE DETAILS
L-8 PRELIMINARY WALL AND FENCE DETAILS
L-9 PRELIMINARY WALL AND FENCE PLAN-ELEMENTARY
SCHOOL
L-10 PRELIMINARY WALL AND FENCE PLAN-ELEMENTARY
SCHOOL
L-11 EXISTING TREES PLAN
CIVIL:
SHT 1 OF 5 CONCEPTUAL CIVIL GRADING PLAN
STT 2 OF 5 CONCEPTUAL UTILITY PLAN
SHT 3 OF 5 MILLBURY AVENUE STREET PLAN
SHT 4 OF 5 FIRE TRUCK ACCESS TURNING STUDY
SHT 5 OF 5 GARBAGE TRUCK ACCESS TURNING STUDY
ARCHITECT :
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR.
SANTA ANA, CA 92705
CONTACT: CHRISTINE LY
[email protected]
(714) 285-1888
CIVIL :
PSOMAS
865 S. FIGUEROA STREET SUITE 3200
LOS ANGELES, CA 90017
CONTACT: DAVID CURTIS
[email protected]
(213) 223-1524
BARRYDALE ST.
MILLBURY AVE.
WALNUT CREEK
STITCHMAN AVE.
VICINITY MAP
26'-0"
24'-0"
24'-0"
24'-0"
R17'-0" 27'-6" 26'-0" 26'-0" 24'-0" 26'-0" 26'-0"
R17'-0"
R17'-0"
R17'-0"
R17'-0"
R17'-0"
127'-10" 12'-1" 127'-10"
30'-0"
10'-0"
18'-0" 24'-0" 24'-0"
24'-0"
10'-0"
18'-0"
24'-0" 10'-0" 17'-0" 11'-0"
5'-0" 5'-0"
5'-0"
7'-0"
5'-0"
5'-0"
20'-2"
5'-0" 16'-0"
5'-0"
6'-0"
6'-0"
12'-1"
12'-1"
10'-0"
24'-0" 26'-0"
34'-0"
R32'-0" TURNING
RADIUS
34'-6" 12'-7"
10'-0"
12'-1"
23 TOT LOT
MAIN. BLDG
12 2
COMMON OPEN SPACE
17 EVA W/
VEHICULAR
GATE- TENANT
EXIT ONLY
16 MAIL BOXES
POOL
PARK
26'W.
VEHICULAR
GATE CALL BOX
16'-0"
2'-0" 1ST FLOOR TO 1ST FLOOR 28'-9"
3'-4"
16'-0" 2'-0" GAR. TO GAR. 26'-6" 1ST FLOOR TO 1ST FLOOR 27'-9" GAR. TO GAR. 25'-7 1 2
" 25'-0" GAR. TO CURB 1ST FLR. TO CURB
3'-2"
28 MILLBURY AV
WALNUT CREEK
BARRYDALE ST WHITESELL ST
32 22'-0" 23'-6"
BLDG 2
BLDG 6L BLDG 6L
BLDG 6L BLDG 5L
BLDG 6L BLDG 6L
BLDG 5L
BLDG 4
BLDG 6L
BLDG 6
BLDG 4L
BLDG 6 BLDG 6
BLDG 5L
B #1
B # 5 B # 7
B # 9 B # 11
B # 6 B # 8
B # 10
B # 12
B # 13
B # 14
B # 18
B # 15 B # 16
B # 17
1 3 4 5 6 7 8 9 10
11 13
14 15
18 19
20 21
22 24
25 26 27 29 30 31
33 34
35 9'-0" 8'-0" 9'-0"
9'-0" 9'-0"
18'-0"
ADA
ADA ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA 5'-0" 7'-0" 5'-0" 5'-0" 5'-0"7'-0"
18'-0"
RECREATION
BUILDING
BLDG 5D BLDG 5D
B # 19 B # 20
BLDG 2
BLDG 5
BLDG 5
BLDG 5
BLDG 6L BLDG 6L
BLDG 6L BLDG 5L
BLDG 6L BLDG 6L
BLDG 5L
BLDG 4 BLDG 6L
BLDG 6
BLDG 4L
BLDG 6 BLDG 6
BLDG 5L
B #1
B # 2
B # 3
B # 4
B # 5 B # 7
B # 9 B # 11
B # 6 B # 8
B # 10
B # 12 B # 13
B # 14
B # 18
B # 15 B # 16
B # 17
ADA
ADA ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA
BLDG 5D BLDG 5D
B # 19 B # 20
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X
X X X X X X X X X X X X X X X X X
X X
X
X
X
X X X
X X X X X X X X X X X X X X X
X X X X
X X
X X X
X
X
X
X X X X X X X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X
X X X X X X X X X X X X X
14.0243
BLDG 5
B # 4
BLDG 5
B # 2
B # 3
BLDG 5
11'-0"
10'-0"
5'-0"
PHONE: PHONE: JOB:
BASSETT VILLAS BALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
10.12.26 2310
CONCEPTUAL SITE PLAN
SCHEME 15
ADDRESS: 1314 E. LE BORGNE AVENUE
BALDWIN PARK, CA
ZONE-PROPOSED RESIDENTIAL- R3
SITE AREA-GROSS5.22 ACRES (227,291 SF)
YIELD 104 UNITS
DENSITY 19.9DU/AC
OPEN SPACE REQUIRED :
COMMON OPEN SPACE : 250 X 104= 26,000 SF
PRIVATE OPEN SPACE : 100 X 104= 10,400 SF
TOTAL OPEN SPACE : 36,400 SF
PARKING:
REQUIRED:
104 UNITS 2 & 3 BED x 2.0 SPACES = 208.0 SPACES
104 UNITS x .33 GUEST SPACES= 35.0 SPACES
TOTAL REQUIRED = 243.0 SPACES
PROVIDED:
104 UNITS x 2 CAR GARAGE = 208 SPACES
PARALLEL PARKING - 10' x 23' = 11 SPACES
90 DEGREE PARKING - 8.5' x 18' = 24 SPACES
243 SPACES
PARKING RATIO: 243/104= 2.34
PRODUCT:
RENTAL TOWNHOUSES - 104 UNITS:
39 PLAN 1&1X - 1,060 SF, 2 BED, 2.5 BA, 2 CAR GAR.
36 PLAN 2A - 1,260 SF, 3 BED, 2.5 BA, 2 CAR GAR.
19 PLAN 2AX - 1,270 SF, 3 BED, 2.5 BA, 2 CAR GAR.
10 PLAN 2B - 1,275 SF, 3 BED, 2 BA, 2 CAR GAR.
104 TOTAL- TWO STORY
LOT COVERAGE: +/-92,742 / 227,291 = +/-40.8%
(60% MAX ALLOWED)
SITE PLAN A.0.1
0 20'
40'
80'
160'
OPEN SPACE PROVIDED :
COMMON OPEN SPACE : (20'x20' min.)
PRIVATE OPEN SPACE : 10,570 SF (94 units x100 sf
+10 units x117 sf )
TOTAL OPEN SPACE : 38,263 SF
BLDG 2
BLDG 6L BLDG 6L
BLDG 6L BLDG 5L
BLDG 6L BLDG 6L
BLDG 5L
BLDG 4
BLDG 6L
BLDG 6
BLDG 4L
BLDG 6 BLDG 6
BLDG 5L
B #1
B # 5 B # 7
B # 9 B # 11
B # 6 B # 8
B # 10
B # 12
B # 13
B # 14
B # 18
B # 15 B # 16
B # 17
BLDG 5D BLDG 5D
B # 19 B # 20
BLDG 2
BLDG 5
BLDG 5
BLDG 5
BLDG 6L BLDG 6L
BLDG 6L BLDG 5L
BLDG 6L BLDG 6L
BLDG 5L
BLDG 4 BLDG 6L
BLDG 6
BLDG 4L
BLDG 6 BLDG 6
BLDG 5L
B #1
B # 2
B # 3
B # 4
B # 5 B # 7
B # 9 B # 11
B # 6 B # 8
B # 10
B # 12 B # 13
B # 14
B # 18
B # 15 B # 16
B # 17
ADA
ADA ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA
BLDG 5D BLDG 5D
B # 19 B # 20
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X
X X X X X X X X X X X X X X X X X
X X
X
X
X
X X X
X X X X X X X X X X X X X X X
X X X X
X X
X X X
X
X
X
X X X X X X X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X
X X X X X X X X X X X X X
14.0243
BLDG 5
B # 4
BLDG 5
B # 2
B # 3
BLDG 5
PHONE: PHONE: JOB:
BASSETT VILLAS BALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
10.12.26 2310
OPEN SPACE EXHIBIT A.0.2
0 20'
40'
80'
160'
PRODUCT:
RENTAL TOWNHOUSES - 104 UNITS:
OPEN SPACE REQUIRED :
COMMON OPEN SPACE : 250 X 104= 26,000 SF
PRIVATE OPEN SPACE : 100 X 104= 10,400 SF
TOTAL OPEN SPACE : 36,400 SF
COMMON OPEN SPACE PROVIDED : (20',20' MIN.)
PRIVATE SPACE PROVIDED: 10,570 SF (94 units @100 sf )
+ (10 unit @117 sf )
TOTAL OPEN SPACE : 38,263 SF
150'
81'-7" 48'-0" 150'-0" 150'-0"
29'-3"
28'-0"
26'-8"
GAR. TO GAR.
1ST FLOOR TO 1ST FLOOR
2ND FLOOR TO 2ND FLOOR 127'-10"
29'-3"
28'-0"
26'-8"
GAR. TO GAR.
1ST FLOOR TO 1ST FLOOR
2ND FLOOR TO 2ND FLOOR 127'-10"
147' 52'
60'
50'
150'
150'
150'
150' 150'
55' 150'
55' 150' 150'
150' 120' 150' 150'150'
150' 150' 150'
139' 150' 52'
147'
150'
150' 150'
55'
23 TOT LOT
MAIN. BLDG
12 2
COMMON OPEN SPACE
17 EVA W/
VEHICULAR
GATE- TENANT
EXIT ONLY
16 MAIL BOXES
POOL
PARK
26'W.
VEHICULAR
GATE CALL BOX 150'
28 MILLBURY AV
WALNUT CREEK
BARRYDALE ST WHITESELL ST
R300'-0"
R300'-0"
R300'-0"
R300'-0"
R300'-0" GARAGE TO CURB 25'-7
1 2
"
106'-6" 26'-6" 27'-9" GAR. TO GAR. 2ND FLOOR TO 2ND FLOOR 1ST FLOOR TO 1ST FLOOR 25'-2" 42'-6" 27'-6" 28'-9" GAR. TO GAR. 2ND FLOOR TO 2ND FLOOR 1ST FLOOR TO 1ST FLOOR 26'-2" 32 BLDG 2
BLDG 6L BLDG 6L
BLDG 6L BLDG 5L
BLDG 6L BLDG 6L
BLDG 5L
BLDG 4
BLDG 6L
BLDG 6
BLDG 4L
BLDG 6 BLDG 6
BLDG 5L
B #1
B # 5 B # 7
B # 9 B # 11
B # 6 B # 8
B # 10
B # 12
B # 13
B # 14
B # 18
B # 15 B # 16
B # 17
1 3 4 5 6 7 8 9 10
11 13
14 15
18 19
20 21
22 24
25 26 27 29 30 31
33 34
35 RECREATION
BUILDING
BLDG 5D BLDG 5D
B # 19 B # 20
BLDG 2
BLDG 5
BLDG 5
BLDG 5
BLDG 6L BLDG 6L
BLDG 6L BLDG 5L
BLDG 6L BLDG 6L
BLDG 5L
BLDG 4 BLDG 6L
BLDG 6
BLDG 4L
BLDG 6 BLDG 6
BLDG 5L
B #1
B # 2
B # 3
B # 4
B # 5 B # 7
B # 9 B # 11
B # 6 B # 8
B # 10
B # 12 B # 13
B # 14
B # 18
B # 15 B # 16
B # 17
ADA
ADA ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA
ADA
BLDG 5D BLDG 5D
B # 19 B # 20
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X
X
X X X X X
X
X X
X
X
X X X X X
X X X X X X X
X X X
X X X X
X
X
X X
X
X X
X
X
X X X X X X X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X
X X X X X X X X X X X X X
14.0243 50'
BLDG 5
B # 4 150'
BLDG 5
B # 2
B # 3
BLDG 5
PHONE: PHONE: JOB:
BASSETT VILLAS BALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
10.12.26 2310
FIRE ACCESS PLAN A.0.3
0 20'
40'
80'
160'
R=17' min.
R=43' FIRE LANE TURNING RADIUS
FIRE HOSE PULL & LENGTH
17' MIN. @ INSIDE CORNER
FRONT DOOR LOCATION OF BUILDING
LEGEND:
43' @ OUTSIDE CORNER
BUILDING TYPE CONSTRUCTION
TYPE
NO. OF
STORY OCCUPANCY SPRINKLER
TOWNHOUSES VB 2 R3-U2 13R
LEASING
BUILDING
VB 1 B1 FULL 13
26'-0" MIN. FIRE ACCESS LANE 26'-0" MIN.
150'
ADDITIONAL ALTERNATE ACCESS LANE
FIRE ACCESS PLAN
ADDRESS: 1314 E. LE BORGNE AVENUE
BALDWIN PARK, CA
ZONE-PROPOSED RESIDENTIAL- R3
SITE AREA-GROSS5.22 ACRES (227,291 SF)
YIELD 104 UNITS
DENSITY 19.9DU/AC
FIRE HYDRANTS WITHIN 300 FT
GARAGE TO CURB 25'-7
1 2
"
106'-6" 26'-6" 27'-9" GAR. TO GAR. 2ND FLOOR TO 2ND FLOOR 1ST FLOOR TO 1ST FLOOR 25'-2" 42'-6" 27'-6" 28'-9" GAR. TO GAR. 2ND FLOOR TO 2ND FLOOR 1ST FLOOR TO 1ST FLOOR 26'-2" BLDG 2
BLDG 5
BLDG 5
BLDG 5 BLDG 6L BLDG 6L BLDG 6L BLDG 5L
BLDG 6L BLDG 6L BLDG 5L
BLDG 4 BLDG 6L BLDG 6
BLDG 4L BLDG 5D BLDG 5D
BLDG 6 BLDG 6 BLDG 5L
B #1
B # 2
B # 3
B # 4 B # 5 B # 7 B # 9 B # 11
B # 6 B # 8 B # 10
B # 12 B # 13 B # 14
B # 18 B # 19 B # 20
B # 15 B # 16 B # 17
PHONE: PHONE: JOB:
BASSETT VILLAS BALDWIN PARK, CA
STORM PROPERTIES, INC.
970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502
(310) 986-2102
ANGELENO ASSOCIATES, INC.
147 E. CITY PLACE DR. SANTA ANA CA 92705
(714) 285-1888
04.10.26 2310
SITE PLAN A.0.4
TRASH EXHIBIT
TRASH EXHIBIT
ADDRESS: 1314 E. LE BORGNE AVENUE
BALDWIN PARK, CA
ZONE-PROPOSED RESIDENTIAL- R3
SITE AREA-GROSS5.22 ACRES (227,291 SF)
YIELD 104 UNITS
DENSITY 19.9DU/AC
0 8 16 32
SCALE: 1/16" = 1'-0"
10.12.26
PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 10.12.26 2310 A.0.4 EXISITING SITE PHOTOS
C 100 B 103 102 101
LAVATORY VITREOUS CHINA MEMOIRS LAVATORY VITREOUS CHINA LAVATORY VITREOUS CHINA MEMOIRS LAVATORY VITREOUS CHINA B C B C 201 201 200 203 202 201 201 2-CAR GARAGE 20'-2" x 20'-2" P BA. 2 DN UP LIVING 12'-10" x 13'-9" KITCHEN 7'-10" x 9'-5" P. BEDRM 2 12'-11" x 13'-3" P. BEDRM 1 11'-10" x 14'-10" P BA. 1 PWD LAU PATIO TECH/LINEN FIRST FLOOR 2 BEDROOM UNIT - 1,060 SF SECOND FLOOR 21'-2" 39'-0" 21'-2"
35'-2" 103 102 100 101 C B
MEMOIRS LAVATORY VITREOUS CHINA
LAVATORY VITREOUS CHINA
MEMOIRS LAVATORY VITREOUS CHINA LAVATORY VITREOUS CHINA C C BA 2 BEDRM 3 10'-0" x 10'-4" DN 2-CAR GARAGE 20'-2" x 20'-2" UP LIVING 10'-1" x 16'-9" KITCHEN 10'-6" x 13'-5" P BA P. BEDRM 12'-11" x 13'-3" BEDRM 2 10'-3" x 11'-1" PWD P. CLT LAU PATIO LAVATORY VITREOUS CHINA 104 100 E105 LIVING 10'-7" x 16'-9" KITCHEN 10'-0" x 12'-4" PWD UP TECH/LINEN FIRST FLOOR 3 BEDROOM UNIT - 1,260 SF SECOND FLOOR FIRST FLOOR - ADA 21'-2" 42'-0" 21'-2"
40'-6" 100 NO. 200 2' - 2" 6' - 8" 202 2' - 6" 6' - 8" 206 2' - 8" 205 5' - 0" 201 2' - 4" 6' - 8" 6' - 8" 6' - 8" 204 5' - 0" 6' - 8" 203 2' - 10" 6' - 8" 101 16' - 0" 7' - 0" 102 2' - 8" 6' - 8" 103 2' - 6" 6' - 8" 104 3' - 0" 6' - 8" 105 2' - 10" 6' - 8" 106 2' - 4" 6' - 8" WOOD METAL WIDTH HEIGHT SIZE NO. ABCED 2' - 0" 4' - 0" 3' - 0" 4' - 0" 5' - 0" 5' - 0" 1' - 6" 5' - 6" 4' - 0" 5' - 0" OPERATION SLIDING SINGLE HUNG SLIDING SINGLE HUNG SLIDING WIDTH HEIGHT 3' - 0" 8' - 0" SIZE TYPE SIZE TYPE NO. WIDTH HEIGHT WOOD METAL P BA. 2 P. BEDRM 2 12'-11" x 13'-3" PARTIAL SECOND FLOOR MEMOIRS LAVATORY VITREOUS CHINA B C 201 P. BEDRM 1 11'-10" x 14'-10" P BA. 1LAVATORY VITREOUS CHINA MEMOIRS LAVATORY VITREOUS CHINA B C 201 PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 10.12.26 2310 0 1'2' 4' 8' UNITS 1 & 2A A.2.1 FLOOR PLANS PLAN 2A PLAN 1 DOOR SCHEDULE WINDOW SCHEDULE PLAN 1X
102 101 103
MEMOIRS LAVATORY VITREOUS CHINA 100 A 106LAVATORY VITREOUS CHINA C 107 C 202 202
LAVATORY VITREOUS CHINA
MEMOIRS LAVATORY VITREOUS CHINA C C 201 201 206 E FIRST FLOOR 3 BEDROOM UNIT - 1,275 SF SECOND FLOOR 21'-2" 47'-0" 21'-2" 2-CAR GARAGE 20'-2" x 20'-2" P. BEDRM 2 12'-10" x 11'-6" P BA.1 LAU BA. 2 BEDRM 3 10'-2" x 10'-9" BEDRM 2 10'-1" x 11'-8" LIVING 11'-2" x 21'-9" KITCHEN 10'-2" x 12'-4" 100 NO. 200 2' - 2" 6' - 8" 202 2' - 6" 6' - 8" 206 2' - 8" 205 5' - 0" 201 2' - 4" 6' - 8" 6' - 8" 6' - 8" 204 5' - 0" 6' - 8" 203 2' - 10" 6' - 8" 101 16' - 0" 7' - 0" 102 2' - 8" 6' - 8" 103 2' - 6" 6' - 8" 104 3' - 0" 6' - 8" 107 6' - 0" 8' - 0" 105 2' - 10" 6' - 8" 106 2' - 4" 6' - 8" WOOD METAL OTHER WIDTH HEIGHT SIZE NO. ABCED 2' - 0" 4' - 0" 3' - 0" 4' - 0" 5' - 0" 5' - 0" 1' - 6" 5' - 6" 4' - 0" 5' - 0" OPERATION SLIDING SINGLE HUNG SLIDING SINGLE HUNG SLIDING WIDTH HEIGHT 3' - 0" 8' - 0" SIZE TYPE SIZE TYPE NO. WIDTH HEIGHT WOOD METAL 103 102 100 101 C B
MEMOIRS LAVATORY VITREOUS CHINA
LAVATORY VITREOUS CHINA
MEMOIRS LAVATORY VITREOUS CHINA LAVATORY VITREOUS CHINA C C BA 2 BEDRM 3 10'-0" x 10'-10" DN P BA P. BEDRM 12'-11" x 13'-3" BEDRM 2 10'-3" x 11'-7" P. CLT LAUTECH/LINEN SECOND FLOOR 21'-2" 41'-0" FIRST FLOOR 3 BEDROOM UNIT - 1,270 SF 2-CAR GARAGE 20'-2" x 20'-2" UP LIVING 12'-10" x 16'-9" KITCHEN 7'-10" x 9'-5" PWD PATIO 21'-2" 42'-0" PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 10.12.26 2310 0 1'2' 4' 8' UNIT 2AX & 2B A.2.2 FLOOR PLANS PLAN 2B DOOR SCHEDULE WINDOW SCHEDULE PLAN 2AX
42'-6"
39'-0" UNIT 1X UNIT 1R
VITREOUS CHINA VITREOUS CHINA
VITREOUS CHINA VITREOUS CHINA
42'-6"
34'-6" UNIT 1X UNIT 1R
8"
VITREOUS CHINA VITREOUS CHINA
4:12 4:12
4:12 4:12
4:12 PHONE: PHONE: JOB: BASSETT VILLAS BALDWIN PARK, CA STORM PROPERTIES, INC. 970 W. 190 TH STREET, SUITE 995, TORRANCE, CA 90502 (310) 986-2102 ANGELENO ASSOCIATES, INC. 147 E. CITY PLACE DR. SANTA ANA CA 92705 (714) 285-1888 10.12.26 2310 BUILDING 2 A.3.1 FLOOR PLANS BUILDING 2 - SECOND FLOOR BUILDING 2 - FIRST FLOOR 01'2' 4' 8' 16' BUILDING 2 - ROOF PLAN