CITY COUNCIL
REGULAR MEETING
Agenda
November 4, 2026, 7:00 PM
Mayor
Mayor Pro Tem
Councilmember
Councilmember
Councilmember
Daniel Damian
Jean M. Ayala
Alejandra Avila
Emmanuel J. Estrada
Manuel Lozano
Welcome to your City Council Meeting
We welcome your interest and involvement in the City’s legislative process. This agenda includes information about topics coming before the City Council and the action recommended by city staff. You can read about each topic in the staff reports, which are available on the city’s website and in the Office of the City Clerk.
Please note that, if a disruption prevents public participation through the audiovisual platform, the legislative or governing body shall recess the open session and make good faith efforts to restore public access and participation.
If public access cannot be restored after good faith efforts, the body may resume the meeting only after adopting, by roll call vote on the formal findings.
How to watch and participate
In Person - LOCATION
CHANGE
Most City Council meetings take place at
Baldwin Park Performing Art Center,
4640 Maine Ave., Baldwin Park, CA
91706
Online
Audio streaming will be available at:
Baldwin Park You Tube Channel
CivicClerk Meeting Portal
Zoom
Zoom Link:
Join Zoom Meeting
Zoom Link:
https://baldwinparkca.zoomgov.com/j/1654054143
Public Comments
The public is encouraged to address the City Council or any of its Agencies listed on this agenda on any matter posted on the agenda or on any other matter within its jurisdiction. In accordance with Chapter 39 of the Baldwin Park Municipal Code, Speakers must address the City Council as a whole and refrain from making impertinent, slanderous, or profane remarks or disrupt the peace of the meeting. Speaker cards are available at the podium and by request with the City Clerk.
Public Communication
There is a three-minute speaking time limit. In accordance with Chapter 39 of the Baldwin Park Municipal Code Section 39.03(C) Time limitation. Every member of the public addressing the Council shall limit his or her remarks to a maximum of three minutes during all speaking opportunities; provided, that during oral communications just prior to adjournment comment shall not exceed two minutes per speaker. When large numbers of persons wish to speak, the presiding officer of the meeting may announce a reduction of the speaking time allotted to each person so all persons wishing to speak may do so.
Please notify the City Clerk if you require the services of an interpreter. No Action may be taken on a matter unless it is listed on the agenda, or unless certain emergency or special circumstances exist. The legislative body or its staff may: 1) Briefly respond to statements made or questions asked by persons; or 2) Direct staff to investigate and/or schedule matters for consideration at a future meeting.
Comments in writing
You can provide your comments for City Council in writing by sending it to the City Clerk Department in advance.
Your written comments will be distributed and will be made part of the written record but will NOT be read verbally at the meeting. Written comments to the City Council may be submitted by email:
[email protected] or mailed to: City Clerk Department, 14403 E Pacific Ave., Baldwin Park, CA 91706
Communications to the City Council are public record and will become part of the City’s electronic records.
Please note: e-mail addresses, names, addresses, and other contact information are not required, but if included in any communication to the City Council, will become part of the public record.
Reasonable Accommodations
Individuals with disabilities may request an agenda packet in appropriate alternative formats as required by the Americans with Disability Act of 1990. Reasonable accommodations and auxiliary aids will be provided to effectively allow participation in the meeting. Please contact the City Clerk’s Office at (626) 960-401, ext. 466.
Notice Regarding California Environmental Quality Act (CEQA) Determinations Pursuant to CEQA, a "project" is defined as a "whole action" subject to a public agency's discretionary funding or approval that has the potential to either (1) cause a direct physical change in the environment or (2) cause a reasonably foreseeable indirect physical change in the environment. "Projects" include discretionary activity by a public agency, a private activity that receives any public funding, or activities that involve the public agency's issuance of a discretionary approval and is not statutorily or categorically exempt from CEQA. (Pub. Res. Code § 21065.) To the extent that matters listed in this Agenda are considered "projects" under CEQA, their appropriate CEQA determination will be listed below each recommendation. If no CEQA determination is listed, it has been determined that the action does not constitute a "project" under CEQA.
CALL TO ORDER
INVOCATION
PLEDGE OF ALLEGIANCE
ROLL CALL
REPORT FROM CLOSED SESSION
ANNOUNCEMENTS
PROCLAMATIONS, COMMENDATIONS & PRESENTATIONS
PUBLIC COMMUNICATIONS
CONSENT CALENDAR
All items listed are considered to be routine business by the City Council and will be approved with one motion.
There will be no separate discussion of these items unless a City Councilmember so requests, in which case, the item will be removed from the general order of business and considered in its normal sequence on the agenda.
1. City of Baldwin Park's Warrants and Demands
It is recommended that the City Council ratify the attached Warrants and Demands Register.
2. Meeting Minutes of October 21, 2026
It is recommended that the City Council approve the following meeting minutes of the Special City Council Meeting, Regular City Council Meeting, Finance Authority Meeting and Housing Authority Meeting.
3. Claim Rejection
It is recommended that the City Council reject the following claim and direct staff to send the appropriate notice of rejection to claimant:
• Miguel Angel Guerrero Claimant alleges bodily injury and property damage. • Jaime Marquez Claimant alleges past and future economic and non-economic losses.
This government claim, and all government claims, should be considered as potential lawsuits in the future. Thus, it is requested that all City Staff, the Mayor and all Council Members refrain from making any statements, whether public or private in nature. It is important that no statements be made so as to not prejudice this claim in any way which can happen if public or private comments are made about this claim by City staff or Council Members.
4. Authorize Award of Contract to Act 1 Construction, Inc. to Construct Ana Montenegro Park It is recommended that the City Council:
1. Approve and award the construction contract to construct Ana Montenegro Park to Act 1 Construction, Inc. in the amount of $3,790,000.00; and
2. Approve a 10% construction contingency in the amount of $379,000.00 for the project; and
3. Authorize the Mayor and City Clerk to execute the contract with Act 1 Construction, Inc.; and
4. Authorize the Director of Finance to make appropriations and budget adjustments to cover the awarded contract amount plus the contingency, and set up necessary account numbers.
PUBLIC HEARING
5. Appeal from Planning Commission denial of a project for development of a 5.22-acre property for a multi-family residential project comprised of 20 two-story buildings and totaling 104 townhome apartment units. The project, if approved, would require a General Plan Amendment, Zone Change, Design Review, and Administrative Adjustment as well as the adoption of the IS-MND prepared for the project in compliance with the California Environmental Quality Act (CEQA) if approved (Location: 1314 LeBorgne Avenue, APNs 8558-023-905, 8558-023-910, and 8558-015-900: Applicant: Storm Properties; Case Numbers: AGP 25-01, Z 25-01, PR 25-17, and AA 25-02).
It is recommended that the City Council:
1. Conduct a public hearing.
2. Grant the appeal and
A. Find that the Mitigated Negative Declaration and the Initial Study-Mitigated Negative Declaration (IS-MND) as well as the associated Mitigation Monitoring and Reporting Plan (MMRP) was prepared in accordance with the California Environmental Quality Act (Pub.
Resources Code, §§ 21000 et seq.) ("CEQA") and the State CEQA Guidelines (Cal. Code Regs, tit. 14, §§ 15000 et seq.) and adopt the IS-MND and MMRP for this Project.
B. Adopt Resolution No. 2026-030 APPROVING THE PROJECT FOR THE CONSTRUCTION OF 104 TOWNHOME APARTMENT UNITS, GENERAL PLAN AMENDMENT TO CHANGE
THE LAND USE DESIGNATION FROM OPEN SPACE TO RESIDENTIAL, A ZONE
CHANGE TO CHANGE THE ZONING FROM OPEN SPACE (OS) TO HIGH-DENSITY RESIDENTIAL (R-3), AN ADMINISTRATIVE ADJUSTMENT TO ALLOW FOR A MINOR
DEVIATION FROM THE BUILDING LENGTH STANDARDS, AND A DESIGN REVIEW APPLICATION.
C. Adopt Resolution No. 2026-031 AMENDING THE LAND USE DESIGNATION IN THE
GENERAL PLAN FROM OPEN SPACE TO MULTI-FAMILY RESIDENTIAL FOR THE PROPERTY LOCATED AT 1314 LEBORGNE AVENUE, ASSESSOR PARCEL NOS. 8558-
023-905, 8558-023-910, AND 8558-015-900.
D. Adopt Ordinance No. 1531 AMENDING THE ZONING MAP FOR THE PROPERTY LOCATED AT 1314 LEBORGNE AVENUE, ASSESSOR PARCEL NOS. 8558-023-905, 8558- 023-910, AND 8558-015-900 FROM OPEN SPACE (OS) TO HIGH-DENSITY RESIDENTIAL (R-3).
OR
3. Deny the appeal and adopt Resolution No. 2026-032 DENYING THE PROJECT FOR THE CONSTRUCTION OF 104 TOWNHOME APARTMENT UNITS, A GENERAL PLAN
AMENDMENT TO CHANGE THE LAND USE DESIGNATION FROM OPEN SPACE TO
MULTI-FAMILY RESIDENTIAL, A ZONE CHANGE TO CHANGE THE ZONING FROM OPEN SPACE (OS) TO HIGH-DENSITY RESIDENTIAL (R-3), AN ADMINISTRATIVE ADJUSTMENT
TO ALLOW FOR A MINOR DEVIATION FROM THE BUILDING LENGTH STANDARDS, AND A DESIGN REVIEW APPLICATION FOR THE PROPERTY LOCATED AT 1314 LEBORGNE AVENUE, ASSESSOR PARCEL NOS. 8558-023-905, 8558-023-910, AND 8558-015-900.
REPORTS OF OFFICERS
CITY COUNCIL ACTING AS SUCCESSOR AGENCY OF THE DISSOLVED COMMUNITY
DEVELOPMENT COMMISSION
CITY COUNCIL / CITY CLERK / CITY TREASURER / STAFF REQUESTS & COMMUNICATION
ADJOURNMENT
CERTIFICATION
I, Christopher Saenz, City Clerk of the City of Baldwin Park hereby certify that, under penalty of perjury under the laws of the State of California that the foregoing agenda was posted on the City Hall bulletin board not less than 72 hours prior to the meeting. Dated this 29th day of October 2026.
Christopher Saenz
City Clerk
For further information regarding agenda items, please contact the office of the City Clerk at (626) 960-4011 ext. 466 or via e-mail at [email protected].
ITEM NO: 1.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
Rose Tam, Finance Director
PREPARED BY: Ana Zhang, Senior Finance Clerk
DATE: November 4, 2026
SUBJECT: City of Baldwin Park's Warrants and Demands
SUMMARY:
Attached is the Warrants and Demands Register for the City of Baldwin Park to be ratified by the City Council.
RECOMMENDED ACTION:
It is recommended that the City Council ratify the attached Warrants and Demands Register.
FISCAL IMPACT:
The payroll for the last period was $671,454.54 and the attached General Warrants Register was $1,868,886.97 for a total amount of $2,540,341.51.
BACKGROUND:
The attached Claims and Demands report format meet the required information as set out in the California Government Code. Staff has reviewed the requests for expenditures for the appropriate budgetary approval and for the authorization from the department head or its designee. Pursuant to Section 37208 of the California Government Code, the Chief Executive Officer or his/her designee does hereby certify to the accuracy of the demands hereinafter referred. Payments released since the previous City Council meeting and the following is a summary of the payment released:
1.The last payroll of the City of Baldwin Park consists of check numbers 257323 to 257334. Additionally, Automated Clearing House (ACH) Payroll deposits were made on behalf of City Employees from control number 66632 to 66955 for the period September 27, 2026 through October 10, 2026 inclusive; these are presented and hereby ratified in the amount of $671,454.54.
2.General Warrants, with the electronic fund transfer (EFT) bank drafts in the amount of $470,421.99 and checks from 257253 to 257411 in the amount of $1,398,464.98 for the period of October 13, 2026, to October 26, 2026, inclusive; in the total amount of $1,868,886.97 constituting of claims and demands against the City of Baldwin Park, are herewith presented to the City Council as required by law, and the same hereby ratified.
DISCUSSION:
None
ALTERNATIVES:
None
CEQA REVIEW:
None
LEGAL REVIEW:
This report does not require legal review.
ATTACHMENTS:
1. Check Register-11-4-2026
Amount
257275 10/15/2026 US BANK ITEMS FOR 2026 ANNUAL HEALTH & WELLNESS FAIR 100-10-150-53370-11123 $ 322.94 257275 10/15/2026 US BANK DEGREE VERIFICATION FROM HR FOR ALICIA CHAVEZ 100-10-150-51101-11124 $ 19.95 257275 10/15/2026 US BANK HR LUNCH FOR EXTERNAL PANELIST 100-10-150-51101-11124 $ 109.85 257275 10/15/2026 US BANK ITEMS FOR INTERVIEW PANEL 100-10-150-51101-11124 $ 66.47 257275 10/15/2026 US BANK BOOTCAMP GRADUATION 220-30-340-53360-14880 $ 56.42 257275 10/15/2026 US BANK BOOTCAMP FOOD 220-30-340-53360-14880 $ 21.45 257275 10/15/2026 US BANK ANNUAL SGV AWARD CEREMONY 9/17/26 100-10-100-53350-11013 $ 161.90 257275 10/15/2026 US BANK REPLACEMENT AC ADAPTER FOR OWL WEBCAM 401-10-140-53390-00000 $ 30.32 257275 10/15/2026 US BANK BOOTCAMP GRADUATION 220-30-340-53360-14880 $ 68.42 257275 10/15/2026 US BANK BOOTCAMP FOOD 220-30-340-53360-14880 $ 66.97 257275 10/15/2026 US BANK DSAM SOFTWARE FOR COUNCIL CHAMBERS 275-50-765-58100-55018 $ 238.09 257275 10/15/2026 US BANK MEMBERSHIP DUES 401-10-140-53330-00000 $ 130.00 257275 10/15/2026 US BANK SUPPLIES FOR THE FLEET DIVISION 402-50-590-53100-00000 $ 892.50 257275 10/15/2026 US BANK SUPPLIES FOR THE FLEET DIVISION 402-50-591-53100-00000 $ 892.50 257275 10/15/2026 US BANK PERIXX ERGONOMIC KEYBOARD FOR FINANCE 100-20-210-53390-00000 $ 154.68 257275 10/15/2026 US BANK SUPPLIES FOR THE STREET MAINTENANCE 240-50-551-53100-00000 $ 67.47 257275 10/15/2026 US BANK REFUND-WHITE CAP#064 AZUSA CA 240-50-551-53100-00000 $ (43.12) 257275 10/15/2026 US BANK SCAN TREE INVENTORY MAP/INSTALLED IN FLASH DRIVE 240-50-561-53100-00000 $ 22.95 257273 10/15/2026 TRI-SIGNAL INC. HALON&FIRE ALARM SERVICE AGREEMENT 9/30/26-3/29/27 100-60-620-53371-00000 $ 1,410.00 257273 10/15/2026 TRI-SIGNAL INC. MONITOR FIRE ALARM SYSTEM 10/1/26-9/30/27 110-60-685-53371-00000 $ 660.00 257274 10/15/2026 UNITED ROTARY BRUSH CORP BRUSH BROOM REPLACEMENT FOR STREET SWEEPER 246-50-552-53100-15005 $ 1,015.58 257271 10/15/2026 T-MOBILE SEARCH WARRANT 26-20150 TDOAS:9/23-10/22/26 100-30-360-51101-00000 $ 50.00 257271 10/15/2026 T-MOBILE SEARCH WARRANT26-20150 RECURRING PINGS:9/23-10/22 100-30-360-51101-00000 $ 115.00 257272 10/15/2026 TPX COMMUNICATIONS CO LOCAL, LONG DISTANCE TELEPHONE AND DATA 401-10-141-53403-11506 $ 8,540.76 257269 10/15/2026 TIMAX ELECTRIC DUPLICATE PAYMENT:BUSINESS LICENSE:10/2/25&4/16/26 230-20-000-42423-00000 $ 37.50 257269 10/15/2026 TIMAX ELECTRIC DUPLICATE PAYMENT:BUSINESS LICENSE:10/2/25&4/16/26 235-40-000-42417-00000 $ 7.00 257270 10/15/2026 T-MOBILE PHONE-37340-GPS TRACKING 8/21-9/20/26 402-50-590-51101-00000 $ 1,320.90 257268 10/15/2026 THE HUMANE SOCIETY OF POMONA VALLEY, INC. AUG 2026-ANIMAL LICENSING & SERVICE REVENUE 100-30-000-42330-13250 $ (7,956.50) 257269 10/15/2026 TIMAX ELECTRIC DUPLICATE PAYMENT:BUSINESS LICENSE:10/2/25&4/16/26 100-20-000-40231-00000 $ 4.00 257269 10/15/2026 TIMAX ELECTRIC DUPLICATE PAYMENT:BUSINESS LICENSE:10/2/25&4/16/26 100-20-000-42230-00000 $ 71.00 257267 10/15/2026 SUPERTINT NU-CAR TRIM INSTALL CONTROL WINDOW FILM ZOCALO PARK 10/1/26 110-60-685-53371-00000 $ 1,880.00 257268 10/15/2026 THE HUMANE SOCIETY OF POMONA VALLEY, INC. FY26-27 ANIMAL CONTROL SERVICES 100-30-390-51100-13250 $ 7,956.50 257268 10/15/2026 THE HUMANE SOCIETY OF POMONA VALLEY, INC. FY26-27 ANIMAL CONTROL SERVICES 275-30-712-51100-13250 $ 92,876.83 257266 10/15/2026 SOUTHERN CALIFORNIA GAS CO GAS-65704-CITY BLDG-15010 BADILLO 9/2-10/1/26 100-60-620-53400-00000 $ 103.24 257266 10/15/2026 SOUTHERN CALIFORNIA GAS CO GAS-69003-CITY BLDG-13135 GARVEY 9/1-9/30/26 100-60-620-53400-00000 $ 29.39 257266 10/15/2026 SOUTHERN CALIFORNIA GAS CO GAS-69161-S.HOMES-13167 GARVEY 9/1-9/30/26 225-60-691-53400-66027 $ 120.48 257266 10/15/2026 SOUTHERN CALIFORNIA GAS CO GAS-36006-CITY BLDG-14305 MORGAN 8/29-9/29/26 100-60-620-53400-00000 $ 59.62 257266 10/15/2026 SOUTHERN CALIFORNIA GAS CO GAS-41005-CITY PARKS-14255 RAMONA 8/28-9/29/26 252-60-620-53400-00000 $ 1,755.92 257266 10/15/2026 SOUTHERN CALIFORNIA GAS CO GAS-42004-CITY BLDG-14403 PACIFIC 9/2-10/1/26 100-60-620-53400-00000 $ 310.71 257265 10/15/2026 SOLUTIONS-II INC SOFTWARE MAINTENANCE RENEWAL 9/25/26-9/24/27 100-30-310-53379-00000 $ 529.95 257266 10/15/2026 SOUTHERN CALIFORNIA GAS CO GAS-31292-CITY PARKS-1209 VINELAND 8/27-9/25/26 252-60-620-53400-00000 $ 15.23 257266 10/15/2026 SOUTHERN CALIFORNIA GAS CO GAS-34832-CITY BLDG-14403 PACIFIC 9/2-10/1/26 100-60-620-53400-00000 $ 116.11 257262 10/15/2026 SCHINDLER ELEVATOR CORPORATION MAINTENANCE OF ELEVATORS 9/1-11/30/26 245-60-620-53371-15882 $ 8,065.44 257263 10/15/2026 SHI INTERNATIONAL CORP SENTINEL ONE RENEWAL 401-10-140-53379-00000 $ 3,580.00 257264 10/15/2026 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 $ 142.67 257261 10/15/2026 SAN GABRIEL VALLEY WATER COMPANY WATER-157732-SP-1901 PUENTE 8/13-9/15/26 251-50-560-53402-00000 $ 750.96 257261 10/15/2026 SAN GABRIEL VALLEY WATER COMPANY WATER-203976--SP-921 1/4 BALDWIN PARK 8/13-9/15/26 251-50-560-53402-00000 $ 961.04 257261 10/15/2026 SAN GABRIEL VALLEY WATER COMPANY WATER-203978--SP-12748 1/4 FARNELL 8/13-9/15/26 251-50-560-53402-00000 $ 1,709.23 257261 10/15/2026 SAN GABRIEL VALLEY WATER COMPANY WATER-121115-SP-13105 HALINOR 8/13-9/15/26 251-50-560-53402-00000 $ 78.07 257261 10/15/2026 SAN GABRIEL VALLEY WATER COMPANY WATER-121135-SP-13062 AMAR 8/13-9/15/26 251-50-560-53402-00000 $ 259.93 257261 10/15/2026 SAN GABRIEL VALLEY WATER COMPANY WATER-157719--SP-1900 PUENTE 8/13-9/15/26 251-50-560-53402-00000 $ 1,750.16 257259 10/15/2026 RIGHT OF WAY INC MATERIALS & SUPPLIES FOR TRAFFIC DIVISION 251-50-550-53100-00000 $ 482.90 257260 10/15/2026 ROSA CABALLERO RENTAL DEPOSIT JULIA NCNEIL SENIOR CENTER 10/3/26 501-60-000-22333-00000 $ 250.00 257261 10/15/2026 SAN GABRIEL VALLEY WATER COMPANY WATER-120078-SP-12728 RAMONA 8/13-9/15/26 251-50-560-53402-00000 $ 844.13 257257 10/15/2026 PEDROZA CONCRETE SYSTEMS, INC REFURBISH APPROXIMATELEY 2,250 SQ FT OF 245-50-551-51101-15705 $ 9,100.00 257258 10/15/2026 RICOH USA INC MAINTENANCE&OVERAGE-3 RICOH COPIERS 9/25-10/24/26 401-10-141-53371-11504 $ 119.54 257258 10/15/2026 RICOH USA INC LEASE FOR THREE (3) RICOH COPIERS 9/25-10/24/26 401-10-141-58140-11504 $ 788.24 257256 10/15/2026 OKINA DOR REIM MEALS-EL TACO RICO-9/15/26 100-40-400-53350-00000 $ 29.35 257256 10/15/2026 OKINA DOR REIM MEALS-CHEESECAKE FACTORY-SD-9/15/26 100-40-400-53350-00000 $ 139.03 257256 10/15/2026 OKINA DOR REIM MEALS-TRIEU CHAU 9/14/26 100-40-400-53350-00000 $ 38.26 257253 10/15/2026 NEOGOV GOVERTMENTJOBS.COM&INSIGHT SUB 12/7/26-12/6/27 100-10-150-53379-00000 $ 11,758.32 257254 10/15/2026 NEW PIG CORPORATION MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 935.43 257255 10/15/2026 NORBERTO OLAGUE HERNANDEZ YOUTH BASKETBALL OFFICIALS FOR 10/5-11/12/26 100-60-610-51101-16120 $ 1,843.00 Check Register
City of Baldwin Park, CA By (None)
Payment Dates 10/13/2026 - 10/26/2026
Payment Number Payment Date Vendor Name Description (Item) Account Number 1190 10/16/2026 BALDWIN PARK POA POLICE SWORN DUES 100-00-000-21219-00000 $ 7,651.62 1190 10/16/2026 BALDWIN PARK POA POLICE NON-SWORN DUES 100-00-000-21219-00000 $ 1,351.67
Payment Number Payment Date Vendor Name Description (Item) Account Number Amount 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR FAMILY RESOURCE FAIR 501-60-000-22328-00000 $ 160.00 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 85.59 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 39.71 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 28.99 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR FAMILY RESOURCE FAIR 501-60-000-22328-00000 $ 21.97 257275 10/15/2026 US BANK MATERIALS & SUPPLIES-WALNUT CREEK PARK CLEAN UP 501-60-000-22328-00000 $ 753.09 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR FAMILY RESOURCE FAIR 501-60-000-22328-00000 $ 462.94 257275 10/15/2026 US BANK SUPPLIES FOR LITTLE LIBRARY PROGRAM 501-60-000-22328-00000 $ 451.88 257275 10/15/2026 US BANK SUPPLIES FOR LITTLE LIBRARY PROGRAM 501-60-000-22328-00000 $ 396.73 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 12.16 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 28.35 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 658.66 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 23.35 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 18.31 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 17.67 257275 10/15/2026 US BANK FOOD ITEMS FOR SENIOR CENTER TRIP TO LAGUNA BEACH 501-60-000-22327-00000 $ 201.66 257275 10/15/2026 US BANK REIM DEPOSIT-SENIOR CTR TRIP TO HARRAH'S CASINO 501-60-000-22327-00000 $ (600.00) 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 69.99 257275 10/15/2026 US BANK KEYS FOR OUTDOOR MESSAGE BOARD WALNUT CREEK PARK 252-60-620-53100-00000 $ 84.00 257275 10/15/2026 US BANK ADMISSION TICKET FOR SENIOR TRIP TO AQUARIUM 501-60-000-22327-00000 $ 49.95 257275 10/15/2026 US BANK REIM DEPOSIT SENIOR CENTER TRIP TO HARRAH'S CASINO 501-60-000-22327-00000 $ 600.00 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 87.37 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 63.40 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR SENIOR PROM 110-60-630-53100-00000 $ 131.21 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR SENIOR PROM 110-60-630-53100-00000 $ 265.31 257275 10/15/2026 US BANK NETFLIX MONTHLY FEE FOR USAGE AT ARC 100-60-680-53330-00000 $ 5.40 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR TREE LIGHTING CEREMONY 110-60-610-53100-16105 $ 34.23 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR TREE LIGHTING CEREMONY 110-60-610-53100-16105 $ 56.16 257275 10/15/2026 US BANK NETFLIX MONTHLY FEE FOR USAGE AT TEEN CENTER 100-60-660-53330-00000 $ 10.79 257275 10/15/2026 US BANK NETFLIX MONTHLY FEE FOR USAGE AT BARNES PARK 100-60-670-53330-15100 $ 5.40 257275 10/15/2026 US BANK FLYER & POSTCARD FOR DIA DE LOS MUERTOS EVENT 100-60-680-53320-00000 $ 489.95 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR TEEN CENTER 100-60-660-53100-00000 $ 6.40 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR TEEN CENTER 100-60-660-53100-00000 $ 6.60 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR TEEN CENTER 100-60-660-53100-00000 $ 62.10 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR TEEN CENTER 100-60-660-53100-00000 $ 147.25 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR TEEN CENTER 100-60-660-53100-00000 $ 153.77 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR TEEN CENTER 100-60-660-53100-00000 $ 33.12 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 $ 256.17 257275 10/15/2026 US BANK NETFLIX MONTHLY FEE FOR USAGE AT SENIOR CENTER 100-60-630-53330-00000 $ 5.40 257275 10/15/2026 US BANK ICE PACKS FOR BASIC 100-60-650-53100-00000 $ 65.22 257275 10/15/2026 US BANK DRY CLEANING SERVICES FOR GOWNS FOR SENIOR PROM 100-60-630-51100-00000 $ 35.00 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 $ 69.96 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 $ 247.66 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 732.25 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 22.81 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 1,590.02 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 136.15 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 211.47 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 222.61 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 18.74 257275 10/15/2026 US BANK RETURNED ITEMS FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ (604.61) 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 36.51 257275 10/15/2026 US BANK MONTHLY FEE FOR CREATIVE CLOUD ALL APPS 100-60-610-53330-00000 $ 99.99 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 23.51 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 23.51 257275 10/15/2026 US BANK MONTHLY FEE FOR DROPBOX SUBSCRIPTION BP NOW LIVE 100-60-610-53330-00000 $ 11.99 257275 10/15/2026 US BANK AMAZON PRIME MEMBERSHIP FEE 100-60-610-53330-00000 $ 2.20 257275 10/15/2026 US BANK REG FEE SGV CONSORTIUM HOMELESSNESS 2026 FALL 100-60-610-53330-00000 $ 23.18 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR BOXING PROGRAM 100-60-610-53100-16130 $ 207.20 257275 10/15/2026 US BANK LIFEGUARD CERIFICATION CLASS FOR JOSHUA LING 100-60-610-53200-00000 $ 263.82 257275 10/15/2026 US BANK RENEW SG VALLEY NEWS ONLINE SUBSCRIPTION 10/17/26 100-60-610-53330-00000 $ 26.00 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR COMMUNITY CENTER 100-60-610-53100-00000 $ 184.61 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR COMMUNITY CENTER 100-60-610-53100-00000 $ 138.12 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR COMMUNITY CENTER 100-60-610-53100-00000 $ 43.05 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR PUBLIC INPUT MEETING 100-60-610-53100-00000 $ 82.95 257275 10/15/2026 US BANK MATERIALS&SUPPLIES-MARIO KART EVENT COMMUNITY CTR 100-60-610-53100-00000 $ 19.16 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR MARIO KART EVENT 100-60-610-53100-00000 $ 18.76 257275 10/15/2026 US BANK PROFESSIONAL SIDEWALLS FOR EZ-UP'S 100-60-610-53100-00000 $ 440.06 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR COMMUNITY CENTER 100-60-610-53100-00000 $ 28.72 257275 10/15/2026 US BANK CLIPBOARDS FOR SPECIAL EVENTS 100-60-610-53100-00000 $ 68.30 257275 10/15/2026 US BANK HR ANNUAL SUBSCRIPTION FOR EVENTS & ALL NEW HIRES 100-10-150-53379-00000 $ 119.99 257275 10/15/2026 US BANK MEASURE CR INFORMATIONAL MAILER 100-10-120-53370-00000 $ 787.57
Payment Number Payment Date Vendor Name Description (Item) Account Number Amount 257287 10/15/2026 AZUSA WHOLESALE PLUMBING INC PLUMBING SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 7.64 257287 10/15/2026 AZUSA WHOLESALE PLUMBING INC PLUMBING SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 265.47 257287 10/15/2026 AZUSA WHOLESALE PLUMBING INC PLUMBING SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 265.46 257287 10/15/2026 AZUSA WHOLESALE PLUMBING INC PLUMBING SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 7.65 257286 10/15/2026 AXON ENTERPRISE, INC FY26-27-BODY WORN CAMERAS & IN-CAR VIDEO PROGRAM 275-50-765-58110-13026 $ 180,929.17 257287 10/15/2026 AZUSA WHOLESALE PLUMBING INC PLUMBING SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 75.25 257287 10/15/2026 AZUSA WHOLESALE PLUMBING INC PLUMBING SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 75.25 257286 10/15/2026 AXON ENTERPRISE, INC FY26-27-BODY WORN CAMERAS & IN-CAR VIDEO PROGRAM 100-30-310-51100-00000 $ 0.01 257286 10/15/2026 AXON ENTERPRISE, INC FY26-27-BODY WORN CAMERAS & IN-CAR VIDEO PROGRAM 110-30-340-53379-13026 $ 38,979.50 257286 10/15/2026 AXON ENTERPRISE, INC FY26-27-BODY WORN CAMERAS & IN-CAR VIDEO PROGRAM 275-30-765-53379-13026 $ 27,842.50 257283 10/15/2026 APMFG FABRICATORS INC. REPAIRS TO BUS SHELTER ON FRANCISQUITO & FRAZIER 403-10-160-54100-00000 $ 24,323.21 257284 10/15/2026 AT&T AUG 2026-MOBILE DATA COMPUTERS-ACT#082046 100-30-310-53403-00000 $ 1,574.12 257285 10/15/2026 ATAK GRAPHICS REM BAL-PRIDE OF THE VALLEY 5K RUN WINNER CANOPY 501-60-000-22328-16146 $ 513.38 257282 10/15/2026 ALL CITY MANAGEMENT SERVICES, INC CROSSING GUARD SERVICES-8/2-8/15/26 275-30-725-51100-13200 $ 3,669.12 257282 10/15/2026 ALL CITY MANAGEMENT SERVICES, INC CROSSING GUARD SERVICES-8/16-8/29/26 275-30-725-51100-13200 $ 18,078.17 257282 10/15/2026 ALL CITY MANAGEMENT SERVICES, INC CROSSING GUARD SERVICES-8/30-9/12/26 275-30-725-51100-13200 $ 16,511.04 257279 10/15/2026 WEBCO LB LLC SWEEP VARIOUS CITY PARKING LOT&STRUCTURES-SEP 2026 254-50-560-51101-15734 $ 4,800.00 257280 10/15/2026 WEST COAST ARBORISTS, INC PROFESSIONAL SERVICES-ARBORIST SERVICES 8/3-8/6/26 254-50-561-51100-00000 $ 4,182.60 257281 10/15/2026 ALFREDO ROMERO DJ ENTERTAINMENT AT ZOCALO PARK-10/16/26 110-60-685-51101-00000 $ 400.00 257277 10/15/2026 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 245.83 257278 10/15/2026 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 100-60-620-53100-00000 $ 161.69 257278 10/15/2026 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 252-60-620-53100-00000 $ 161.69 257277 10/15/2026 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 19.40 257277 10/15/2026 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 19.40 257277 10/15/2026 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 245.83 257277 10/15/2026 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 2.76 257277 10/15/2026 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 3.86 257277 10/15/2026 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 3.87 257275 10/15/2026 US BANK DRY GAS CYLINDERS-PRELIMINARY ALCOHOL EQUIPMENT 271-30-350-53100-17224 $ 954.54 257276 10/15/2026 US BANK VOYAGER FLEET SYS GAS CARD ACCT#869356121 FOR POLICE DEPARTMENT 402-50-591-53110-16140 $ 462.33 257277 10/15/2026 WALTERS WHOLESALE ELECTRIC CO. MATERIALS & SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 2.77 257275 10/15/2026 US BANK TRAINING FOR CSO ANDREW F. 100-30-310-53200-00000 $ 334.72 257275 10/15/2026 US BANK PORTABLE LAPTOP EXTENDER FOR DISPATCH 100-30-320-53100-00000 $ 102.35 257275 10/15/2026 US BANK ON-CALL ROOM FOR PD PERSONNEL 100-30-340-53100-00000 $ 987.26 257275 10/15/2026 US BANK TRAINING FOR DISPATCHER VANESSA L 100-30-310-53200-00000 $ 199.00 257275 10/15/2026 US BANK REFUND FOR MEMBER REGISTRATION 100-30-310-53200-00000 $ (270.00) 257275 10/15/2026 US BANK THUMB DRIVES FOR PATROL 100-30-310-53100-00000 $ 79.28 257275 10/15/2026 US BANK DOG FOOD FOR K9'S KYRA AND DELMI 100-30-310-53100-17110 $ 155.58 257275 10/15/2026 US BANK REG. FOR DETECTIVES JESSICA S. & SUMMER A. 100-30-310-53200-00000 $ 20.00 257275 10/15/2026 US BANK MATERIALS & SUPPLIES -USE FOR INK & OTHER ITEMS 401-10-150-53100-00000 $ 715.57 257275 10/15/2026 US BANK REPLENISH TOLL ROAD ACCOUNT 100-30-310-51101-00000 $ 295.00 257275 10/15/2026 US BANK PEACE OFFICER TABS FOR APPLICANTS BACKGROUND CHECK 100-30-310-53100-00000 $ 266.03 257275 10/15/2026 US BANK CLIPBOARDS OF ADMIN/CC DEPT-CITY COUNCIL EVENTS 100-10-100-53100-00000 $ 16.58 257275 10/15/2026 US BANK TRIPOD FOR VALLEY WATER MEETINGS 100-10-100-53100-00000 $ 359.79 257275 10/15/2026 US BANK SGV CHAPTER MEETING 9/23/26 100-20-210-53350-00000 $ 60.00 257275 10/15/2026 US BANK HOTEL STAY:WOMEN IN POLICING CONF 2026 9/7-9/11/26 100-30-310-53200-00000 $ 1,072.44 257275 10/15/2026 US BANK RESERVATION BOOKING FEE (DEPOSIT) 9/13-9/18/26 100-30-310-53200-00000 $ 118.65 257275 10/15/2026 US BANK ICLOUD STORAGE FOR LILY RUBIO 100-30-310-53330-00000 $ 2.99 257275 10/15/2026 US BANK HOTEL STAY FOR SART SUMMIT 2026-9/8-9/11/26 100-30-310-53200-00000 $ 894.87 257275 10/15/2026 US BANK REG.LVMPD MAJOR VOILATOR SCHOOL-DETECTIVE GARCIA 100-30-310-53200-00000 $ 1,030.00 257275 10/15/2026 US BANK HEARING EXAMINER TRAINIG FOR LT MARTIIN 11/2/26 100-30-310-53200-00000 $ 150.00 257275 10/15/2026 US BANK INTERVIEWING-FIRST RESPONDERS COURSE LUNA 10/14/26 100-30-310-53200-00000 $ 150.00 257275 10/15/2026 US BANK CREDIT FROM CANCELLED RESERVATION 100-30-310-53200-00000 $ (118.65) 257275 10/15/2026 US BANK HOTEL STAY FOR BEHIND THE BLUE-9/13-9/18/26 100-30-310-53200-00000 $ 504.00 257275 10/15/2026 US BANK CMPA COURSE FOR LT. MARTIN 100-30-310-53200-00000 $ 135.00 257275 10/15/2026 US BANK HOTEL STAY FOR PD OFFICERS 9/17-9/18/26 100-30-310-53200-00000 $ 220.55 257275 10/15/2026 US BANK RESERVATION BOOKING FEE 9/13-9/18/26 100-30-310-53200-00000 $ 118.65 257275 10/15/2026 US BANK FOOD AND DRINKS FRODUI LANE 100-30-310-51101-00000 $ 293.07 257275 10/15/2026 US BANK FOOD AND DRINKS FOR DUI LANE 100-30-310-51101-00000 $ 81.08 257275 10/15/2026 US BANK ON-CALL ROOM FOR PD PERSONNEL 100-30-310-53100-00000 $ 353.47 257275 10/15/2026 US BANK PUBLIC NOTICE POSTING SUPPLIES-PLANNING COMMISSION 100-40-440-53100-00000 $ 56.38 257275 10/15/2026 US BANK REFUND-STANDING DESK 100-40-440-53390-00000 $ (226.73) 257275 10/15/2026 US BANK INCLOUD STORAGE FOR CHIEF LOPEZ 100-30-300-53330-00000 $ 2.99 257275 10/15/2026 US BANK ICSC LODGING SAN DIEGO-9/14/26 100-40-405-53350-00000 $ 323.48 257275 10/15/2026 US BANK ICSC LODGING SAN DIEGO-9/14/26 100-40-405-53350-00000 $ 368.52 257275 10/15/2026 US BANK ICSC LODGING SAN DIEGO-9/15/26 100-40-405-53350-00000 $ 368.52 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 54.42 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR FAMILY RESOURCE FAIR 501-60-000-22328-00000 $ 120.31 257275 10/15/2026 US BANK ICSC LODGING SAN DIEGO-9/15/26 100-40-405-53350-00000 $ 323.48 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 46.02 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 46.40 257275 10/15/2026 US BANK MATERIALS & SUPPLIES FOR HALLOWEEN HAUNTED HOUSE 501-60-000-22328-00000 $ 49.77
Payment Number Payment Date Vendor Name Description (Item) Account Number Amount 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 85.51 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 85.50 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 32.32 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 105.54 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 197.24 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 197.25 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 56.06 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 56.06 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 105.55 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 22.00 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 188.92 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 188.92 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 27.88 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 27.87 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 22.01 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 82.33 257329 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 1.63 257329 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 1.62 257327 10/22/2026 EZEQUIEL CONTRERAS INSTRUCTOR-TAE KWON DO-8/17-9/10/26 501-60-000-22328-00000 $ 1,059.50 257328 10/22/2026 FUN EXPRESS, LLC SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 58.55 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 82.32 257325 10/22/2026 CITY OF BALDWIN PARK PLUMBING PERMIT-COUNCIL CHAMBER-BLDG-1026-8533 275-50-765-58100-55018 $ 582.90 257326 10/22/2026 CWS SYSTEMS INC. 5%RET-PMT01-CC CHAMBERS RENOVATION-AUG&SEP-PO03784 100-50-520-58100-55018 $ 21,500.00 257326 10/22/2026 CWS SYSTEMS INC. PMT01-CC CHAMBERS RENOVATION-AUG&SEP-PO03784 275-50-765-58100-55018 $ 408,500.00 257325 10/22/2026 CITY OF BALDWIN PARK ELECTRICAL PERMIT-COUNCIL CHAMBER-BLDG-1026-8531 275-50-765-58100-55018 $ 1,247.76 257325 10/22/2026 CITY OF BALDWIN PARK BULDING PERMIT FOR COUNCIL CHAMBER-BLDG-1026-8530 275-50-765-58100-55018 $ 23,066.08 257325 10/22/2026 CITY OF BALDWIN PARK MECHANICAL PERMIT-COUNCIL CHAMBER-BLDG-1026-8532 275-50-765-58100-55018 $ 1,312.96 257323 10/22/2026 CALIFORNIA CLEANING MAINTENANCE SEP 2026-JANITORIAL SRVC FOR CITY FACILITIES 252-60-620-53371-00000 $ 13,960.00 257324 10/22/2026 CINTAS FIRST AID & SAFETY SUPPLIES FOR FIRST AID KIT @ MECHANIC SHOP 246-50-540-53100-15705 $ 186.60 257324 10/22/2026 CINTAS FIRST AID & SAFETY SUPPLIES FOR FIRST AID KIT @ CITY YARD 402-50-590-53100-00000 $ 186.60 257322 10/22/2026 CAL BLEND SOILS INC BULK LANDSCAPE PRODUCTS-TOPSOIL-CITY HALL 251-50-560-53100-00000 $ 1,772.00 257323 10/22/2026 CALIFORNIA CLEANING MAINTENANCE SEP 2026-JANITORIAL SRVC FOR CITY FACILITIES 100-60-620-53371-00000 $ 6,150.00 257323 10/22/2026 CALIFORNIA CLEANING MAINTENANCE SEP 2026-JANITORIAL SRVC FOR CITY FACILITIES 245-60-620-53371-15882 $ 1,600.00 257320 10/22/2026 BLACK & WHITE EMERGENCY VEHICLES, LLC AFTERMARKET EQUIPMENT FOR 2 TRUCKS FOR POLICE 110-30-340-58110-59003 $ 9,246.74 257320 10/22/2026 BLACK & WHITE EMERGENCY VEHICLES, LLC AFTERMARKET EQUIPMENT FOR 2 TRUCKS FOR POLICE 110-30-340-58110-59003 $ 10,366.48 257321 10/22/2026 BLANCA GARCIA MADERA CLEANING SERVICES FOR THE JAIL 100-30-370-51101-00000 $ 70.00 257317 10/22/2026 AT&T ACT#082045-SEP 2026-MOBILE DATA COMPUTERS 100-30-310-53403-00000 $ 1,567.29 257318 10/22/2026 AT&T MOBILITY ACT#928172-MOBILE DATA COMPUTERS-DUE 10/25/26 100-30-310-53403-00000 $ 620.53 257319 10/22/2026 BEE REMOVERS REMOVAL OF BEE COLONY-4230 MAINE-9/17/26 240-50-562-51101-00000 $ 155.00 257314 10/22/2026 ABEL'S AUTO REPAIR & TIRES REPLACEMENT OF ENGINE IN CITY UNIT 5065 402-50-590-53371-00000 $ 7,999.85 257315 10/22/2026 ALL CITY MANAGEMENT SERVICES, INC CROSSING GUARD SERVICES-9/13-9/26/26 275-30-725-51100-13200 $ 17,781.12 257316 10/22/2026 APN LANDSCAPING INC IRRIGATION REPAIR-MAINE AVE-8/3/26 245-50-562-53371-15537 $ 3,950.00 257311 10/15/2026 MELISSA LEPE REFUND RENTAL DEPOSIT-SENIOR CENTER-10/2/26 501-60-000-22333-00000 $ 500.00 257312 10/15/2026 MV CHENG & ASSOCIATES INC. SEP 2026-CONSULTING SRVC-HR MANAGER LEVEL 100-10-150-51101-00000 $ 3,570.00 257313 10/15/2026 RAQUEL M. CERVANTES CASE# RID 1202591-PP#21 PE 10/10/26 100-00-000-21225-00000 $ 115.39 257309 10/15/2026 LOS ANGELES COUNTY SHERIFFS DEPARTMENT LEVY OFFICER FILE#3302501060096-PP#21 PE 10/10/26 100-00-000-21225-00000 $ 142.40 257310 10/15/2026 LUIS FREGOSO INSTRUCTOR-MARIACHI CLASSES-9/14-9/28/26 501-60-000-22328-00000 $ 109.69 257307 10/15/2026 INSIGHT PUBLIC SECTOR FLASHDRIVES FOR DB CASES 100-30-360-53100-00000 $ 744.78 257308 10/15/2026 JESUS CORNEJO REFELT & BALANCE POOL TABLES AT COM CENTER 100-60-610-51101-00000 $ 2,620.00 257305 10/15/2026 HONEYWELL INTERNATIONAL INC. NOV 2026-HVAC MAINTENANCE-PO03762 100-60-620-53371-16100 $ 8,482.23 257306 10/15/2026 INLAND EMPIRE STAGES, LTD TRANSPORTATION FEE TO AQUARIUM-10/5/26 110-60-630-51101-15540 $ 1,833.72 257307 10/15/2026 INSIGHT PUBLIC SECTOR FLASHDRIVES FOR ADMIN CASES 100-30-310-53100-00000 $ 200.00 257302 10/15/2026 GUSTAVO VASQUEZ SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 92.92 257303 10/15/2026 HINDERLITER, DE LLAMAS & ASSOCIATES BP-SALES TAX & AUDIT-JUL-SEP 2026 100-25-299-51100-12410 $ 1,159.20 257304 10/15/2026 HIPOLITO REYES LOPEZ MUSIC ENTER.-SENIOR CENTER BIRTHDAY-10/21/26 501-60-000-22327-00000 $ 350.00 257300 10/15/2026 FRANCHISE TAX BOARD ACT#35425-PP#21 PE 10/10/26 100-00-000-21225-00000 $ 70.00 257301 10/15/2026 FRONTIER COMMUNICATIONS ACT#0421945-CITY PHONE-9/28-10/27/26 401-10-141-53403-11506 $ 3,481.78 257302 10/15/2026 GUSTAVO VASQUEZ SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 163.50 257297 10/15/2026 FORD PRO PD-ANNUAL FEES-FLEETIO FLEET ASSET MANAMGEMENT 402-50-591-53379-55040 $ 5,388.00 257298 10/15/2026 FRANCHISE TAX BOARD ACT#13496-PP#21 PE 10/10/26 100-00-000-21225-00000 $ 347.78 257299 10/15/2026 FRANCHISE TAX BOARD ACT#05913-PP#21 PE 10/10/26 100-00-000-21225-00000 $ 186.79 257295 10/15/2026 EMPLOYMENT DEVELOPMENT DEPT GARNISHMENT ID#48960-PP#21 PE 10/10/26 100-00-000-21225-00000 $ 100.00 257296 10/15/2026 EZEQUIEL CONTRERAS INSTRUCTOR-TAE KNOWN DO-9/14-10/8/26 501-60-000-22328-00000 $ 1,020.50 257297 10/15/2026 FORD PRO GEN-ANNUAL FEES-FLEETIO FLEET ASSET MANAMGEMENT 402-50-590-53379-55040 $ 5,388.00 257292 10/15/2026 DUNN-EDWARDS CORP PAINTING SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 51.19 257293 10/15/2026 ELAINE LUERAS INSTRUCTOR-ZUMBA CLASSES-9/2-9/30/26 501-60-000-22328-00000 $ 299.65 257294 10/15/2026 ELIZABETH DE LOS ANGELES REFUND RENTAL DEPOSIT-ARC-10/3/26 501-60-000-22333-00000 $ 500.00 257290 10/15/2026 COMPSYCH CORPORATION HEALTH FAIR EVENT-9/24/26-ATTENDANCE FEE 100-10-150-53370-11123 $ 150.00 257291 10/15/2026 COURT-ORDERED DEBT COLLECTIONS ACT#72038-PP#21 PE 10/10/26 100-00-000-21225-00000 $ 447.53 257292 10/15/2026 DUNN-EDWARDS CORP PAINTING SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 409.50 257288 10/15/2026 BLANCA GARCIA MADERA CLEANING SRVC FOR THE JAIL 100-30-370-51101-00000 $ 70.00 257289 10/15/2026 CHRISTOPHER SAENZ REIM-HOTEL STAY-CMC SERIES 200-10/27-10/30/26 100-10-120-53200-00000 $ 532.56
Payment Number Payment Date Vendor Name Description (Item) Account Number Amount 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 76.87 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 59.76 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 59.75 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR FAMILY RESOURCE FAIR 501-60-000-22328-00000 $ 32.88 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 18.15 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 11.63 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 11.63 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 65.73 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 65.74 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 18.15 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 9.12 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 17.35 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 17.35 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 35.31 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 35.31 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 9.12 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 3.28 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 9.99 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 9.99 257331 10/22/2026 HOME DEPOT CR-ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ (14.90) 257331 10/22/2026 HOME DEPOT CR-ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ (14.89) 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 3.28 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 28.94 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 34.43 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 34.43 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 33.04 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 33.04 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 28.94 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR YOUTH SPORTS PROGRAM 501-60-000-22326-00000 $ 24.30 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 13.90 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 13.90 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 16.53 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 57.00 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 56.99 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 78.00 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 77.99 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 16.52 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 49.72 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 86.12 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 86.13 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 46.81 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 46.81 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 49.71 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 32.90 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 24.98 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 24.98 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 16.56 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 16.56 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 32.90 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 33.60 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 26.32 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 26.32 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 54.42 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 54.43 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 33.61 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 191.87 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 169.88 257331 10/22/2026 HOME DEPOT CR-ACT#23270-SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ (30.83) 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 10.22 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 30.83 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 24.55 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 24.55 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 10.22 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 38.64 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 4.39 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 4.38 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 17.33 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 17.34 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 38.63 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 32.32 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 4.72 257329 10/22/2026 HOME DEPOT ACT#23262-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 4.72
Payment Number Payment Date Vendor Name Description (Item) Account Number Amount 257376 10/22/2026 B&M SUPPLIERS LLC GLOVES FOR JAIL 100-30-370-53100-00000 $ 130.00 257373 10/22/2026 ARROWHEAD FORENSICS SUPPLIES FOR EVIDENCE 100-30-360-53100-00000 $ 403.07 257374 10/22/2026 AT&T ACT#34644-PHONE&WIRELESS SRVC-10/7-11/6/26 100-30-310-53403-00000 $ 48.78 257375 10/22/2026 AT&T MOBILITY ACT#71137-MOBILE DATA COMPUTERS-9/5-10/4/26 100-30-310-53403-00000 $ 1,018.16 257370 10/22/2026 ADMIN SURE INC. NOV 2026-GEN&AUTO LIABILITY,WORKERS COMP:ADMIN SRV 403-10-160-51100-00000 $ 10,223.00 257371 10/22/2026 ANDERSON'S CROWN FOR SENIOR CENTER PROM 110-60-630-53100-00000 $ 70.86 257372 10/22/2026 ANTHONY VAZQUEZ QAL PESTICIDE LICENSE 251-50-560-53330-00000 $ 410.00 257367 10/22/2026 WINNER PARTY INC MATERIAL & SUPPLIES FOR SENIOR PROM 110-60-630-53100-00000 $ 648.01 257368 10/22/2026 ZACHARY GOBLE PER DIEM ICI CORE COURSE 10/26-11/6/26 100-30-310-53200-00000 $ 80.00 257369 10/22/2026 ACTIVE IMPRESSIONS LLC POLO SHIRTS FOR BUILDING & SAFETY INSPECTOR 100-40-405-53100-00000 $ 127.98 257365 10/22/2026 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 252-60-620-53100-00000 $ 3,128.86 257366 10/22/2026 WICHHICA NHIM REIM-RENTAL DEPOSIT-WALNUT CREEK PARK 10/11/26 501-60-000-22333-00000 $ 150.00 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 252-60-620-53100-00000 $ 15.05 257364 10/22/2026 WASTE MANAGEMENT COLLECTION AND RECYCLING, INC CNG FUEL FOR CNG VEHICLES AND SWEEPERS 402-50-590-53110-16140 $ 4,585.18 257365 10/22/2026 WAXIE SANITARY SUPPLY JANITORIAL SUPPLIES FOR CITY FACILITIES 100-60-620-53100-00000 $ 3,128.86 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 100-60-620-53100-00000 $ 14.91 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 252-60-620-53100-00000 $ 14.92 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 100-60-620-53100-00000 $ 15.06 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 252-60-620-53100-00000 $ 14.91 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 100-60-620-53100-00000 $ 20.91 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 252-60-620-53100-00000 $ 20.91 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 100-60-620-53100-00000 $ 14.91 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 252-60-620-53100-00000 $ 14.92 257363 10/22/2026 VESTIS GROUP, INC UNIFORM SERVICES FOR BUILDING MAINTENANCE STAFF 100-60-620-53100-00000 $ 14.92 257360 10/22/2026 U.S. ARMOR CORPORATION SAFETY VEST FOR OFFICER MOBIN ALI 100-30-340-53100-00000 $ 939.06 257361 10/22/2026 U.S. POSTAL SERVICE MEASURE CR INFO MAILER-CANNABIS REFORM-FY26/27 100-10-120-53370-11435 $ 4,566.10 257362 10/22/2026 V & V MANUFACTURING OFFICER RIVEROS BADGE IN LUCITE 100-30-310-53100-00000 $ 408.85 257357 10/22/2026 THE SHREDDERS PD-DESTRUCTION CONFIDENTAL DOCUMENTS-SEP 2026 100-30-330-51101-00000 $ 246.00 257358 10/22/2026 T-MOBILE PHONE-55455-POLICE DEPARTMENT 8/21-9/20/26 100-30-310-53403-00000 $ 2,643.06 257359 10/22/2026 TUFF KIDZ W. C. INC CONTRACT SVC TUFF KIDZ WRESTLING CLASS 9/1-9/30/26 501-60-000-22328-00000 $ 890.50 257354 10/22/2026 STERICYCLE, INC. OCT 2026-COLLECTION OF BIOHAZARD MATERIALS 100-30-360-53100-00000 $ 85.83 257355 10/22/2026 SVA ARCHITECTS, INC. CONCEPTUAL DESIGN SERVICES FOR TERI G MUSE 275-60-726-58100-54001 $ 55,770.25 257356 10/22/2026 THE COUNSELING TEAM INTERNATIONAL PSYCHOLOGICAL SCREENINGS ORAL INTERVIEWS 9/22/26 100-10-150-51101-11122 $ 800.00 257353 10/22/2026 STAPLES OFFICE SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 $ 91.79 257353 10/22/2026 STAPLES OFFICE SUPPLIES FOR FAMILY SERVICE CENTER 100-60-640-53100-00000 $ 555.03 257353 10/22/2026 STAPLES OFFICE SUPPLIES FOR FAMILY SERVICE CENTER 100-60-640-53100-00000 $ 71.62 257352 10/22/2026 ST. GEORGE'S MEDICAL CLINIC 1 CITY OF BALDWIN PARK-HEP B VACCINE-EVAN MARTIN 100-10-150-51101-11122 $ 150.00 257353 10/22/2026 STAPLES CR-OFFICE SUPPLIES FOR FAMILY SERVICE CENTER 100-60-640-53100-00000 $ (71.62) 257353 10/22/2026 STAPLES OFFICE SUPPLIES FOR FAMILY SERVICE CENTER 100-60-640-53100-00000 $ 10.48 257350 10/22/2026 SIRONA HEALTH NURSING CORPORATION DR26-11799 EXAM 6/13/26 100-30-310-51100-00000 $ 1,942.92 257350 10/22/2026 SIRONA HEALTH NURSING CORPORATION DR26-16076 EXAM 9/23/26 100-30-310-51100-00000 $ 2,001.21 257351 10/22/2026 SMART & FINAL MATERIALS & SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 $ 162.33 257347 10/22/2026 S&S WORLDWIDE, INC MATERIALS & SUPPLIES FOR BARNES PARK 100-60-670-53100-15100 $ 79.01 257348 10/22/2026 SECTRAN SECURITY INC. OCT 2026 SECTRAN SERVICE CASH TRANSFER TO LOOMIS 100-25-299-53370-12404 $ 548.17 257349 10/22/2026 SERVICE FIRST CONTRACTORS POOL CHEMICALS FOR AQUATIC CENTER 252-60-620-53100-00000 $ 1,634.90 257345 10/22/2026 RIO HONDO COMM. COLLEGE AAIC COURSE FOR DET ERNEST BARRIOS 8/3/26 100-30-310-53200-00000 $ 89.00 257345 10/22/2026 RIO HONDO COMM. COLLEGE PC832 ARREST COURSE FOR ANDREW FRANCO 8/10-8/14/26 100-30-310-53200-00000 $ 118.55 257346 10/22/2026 ROSANNA MEJIA CONTRACT SVC HAWAIIAN DANCE CLASS 8/31-10/12/26 501-60-000-22328-00000 $ 409.50 257343 10/22/2026 PPW INMATE TECHNOLOGY SEP 2026-TELEPHONE USAGE FOR INMATES IN JAIL 100-30-370-53403-00000 $ 250.00 257344 10/22/2026 QUENCH USA, INC. QUARTERLY SVC FEE-COFFEE & WATER FILTRATION SYSTEM 100-60-620-51101-00000 $ 167.86 257344 10/22/2026 QUENCH USA, INC. QURTERLY SVC FEE -COFFEE & WATER FILTRATION SYSTEM 252-60-620-51101-00000 $ 167.86 257341 10/22/2026 PALICON GROUP NON-POST BACKGROUND DQ FOR POLICE APPLICANT 100-30-310-51100-00000 $ 340.00 257341 10/22/2026 PALICON GROUP NON-POST BACKGROUND DQ FOR POLICE APPLICANT 100-30-310-51100-00000 $ 1,750.00 257342 10/22/2026 PLANETBIDS, INC. PB SYSTEM 2025-2026 SUBSCRIPTION FEES 240-50-510-51101-00000 $ 6,446.84 257339 10/22/2026 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR POLICE DEPARTMENT 100-30-370-53100-00000 $ 201.97 257339 10/22/2026 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR POLICE DEPARTMENT 100-30-370-53100-00000 $ 411.04 257340 10/22/2026 OMEGA POLYGRAPH, LLC POLYGRAPH EXAMS FOR PD APPLICANTS 100-30-310-51100-00000 $ 3,300.00 257338 10/22/2026 OCCUPATIONAL HEALTH CENTERS OF CALIFORNIA, A MEDICAL CORPORATION PHYSICAL EXAM FOR EMPLOYEES-9/30/26 &10/5/26 100-10-150-51101-11122 $ 175.00 257338 10/22/2026 OCCUPATIONAL HEALTH CENTERS OF CALIFORNIA, A MEDICAL CORPORATION 1 CLASS I PHYSICAL FOR EMPLOYEE - 10/9/26 100-10-150-51101-11122 $ 125.00 257339 10/22/2026 ODP BUSINESS SOLUTIONS, LLC MATERIALS & SUPPLIES FOR POLICE DEPARTMENT 100-30-370-53100-00000 $ 388.74 257335 10/22/2026 LIGHTNING OIL CO., INC. & VACUUM SERVICE PUMP USED OIL-9/23/26 402-50-591-51101-00000 $ 125.00 257336 10/22/2026 MARIPOSA LANDSCAPES INC. AUG 2026-IRRIGATION SRVC AT BARNES PARK 251-50-562-53100-00000 $ 790.00 257337 10/22/2026 NAVIDAD EN EL BARRIO INC FOOD BASKETS FOR CHRISTMAS BASKET PROGRAM 2026 100-60-640-53100-16106 $ 2,000.00 257331 10/22/2026 HOME DEPOT CR-ACT#23270-SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ (50.81) 257334 10/22/2026 JUST REWARDS GIFT CARDS FOR EMPLOYEE TRANSPORTATION 231-50-540-53120-00000 $ 111.50 257335 10/22/2026 LIGHTNING OIL CO., INC. & VACUUM SERVICE PUMP USED OIL-9/23/26 402-50-590-51101-00000 $ 125.00 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 11.07 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 11.07 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 99.13 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 42.62 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 42.61 257331 10/22/2026 HOME DEPOT ACT#23270-SUPPLIES FOR BUILDING MAINTENANCE 252-60-620-53100-00000 $ 76.87
Payment Number Payment Date Vendor Name Description (Item) Account Number Amount DFT0015625 10/15/2026 EMPOWER RETIREMENT EMPOWER 100-00-000-21213-00000 $ 14,314.00 DFT0015626 10/15/2026 EMPOWER RETIREMENT EMPOWER RETIREMENT 100-00-000-21213-00000 $ 2,705.53 DFT0015627 10/15/2026 EMPOWER RETIREMENT EMPOWER 100-00-000-21232-00000 $ 4,120.00 DFT0015599 10/22/2026 PERS-RETIREMENT PT PERS MISC CITY PAID 100-00-000-21256-00000 $ 483.91 DFT0015600 10/22/2026 PERS-RETIREMENT PERS MISC CITY PAID 100-00-000-21256-00000 $ 23,128.61 DFT0015601 10/22/2026 PERS-RETIREMENT PERS MISC CITY PAID - PEPRA 100-00-000-21256-00000 $ 22,665.63 DFT0015592 10/22/2026 PERS-RETIREMENT PERS ADD'L SERVICE CREDIT 100-00-000-21206-00000 $ 1,087.40 DFT0015597 10/22/2026 PERS-RETIREMENT PERS SWORN CITY PAID - PEPRA 100-00-000-21256-00000 $ 32,053.46 DFT0015598 10/22/2026 PERS-RETIREMENT PERS SWORN ER REG PAY 100-00-000-21256-00000 $ 28,719.63 DFT0015577 10/22/2026 PERS-RETIREMENT PERS MISC 350 100-00-000-21206-00000 $ 16,426.13 DFT0015578 10/22/2026 PERS-RETIREMENT PERS SWORN 351 100-00-000-21206-00000 $ 9,426.58 DFT0015579 10/22/2026 PERS-RETIREMENT PERS MISC 352 100-00-000-21206-00000 $ 14,778.82 DFT0015574 10/22/2026 PERS-RETIREMENT PERS SURVIVOR RETIREMENT 100-00-000-21207-00000 $ 199.02 DFT0015575 10/22/2026 PERS-RETIREMENT PERS REDEPOSIT 100-00-000-21206-00000 $ 21.78 DFT0015576 10/22/2026 PERS-RETIREMENT PERS SWORN- 344 100-00-000-21206-00000 $ 31,684.14 257409 10/22/2026 MELANIE NIELSON REFUND RENTAL DEPOSIT-SENIOR CENTER-10/9/26 501-60-000-22333-00000 $ 500.00 257410 10/22/2026 MERCURY FENCE CO., INC FENCE REPAIRS AT GREENWAY PARK-10/8/26 252-60-620-53371-00000 $ 385.00 257411 10/22/2026 MOSLEY WEALTH MANAGEMENT REFUND RENTAL DEPOSIT-COM. CENTER ROOM-10/8/26 501-60-000-22333-00000 $ 150.00 257407 10/22/2026 LIEBERT CASSIDY WHITMORE SEP 2026-LEGAL SRVC-BA020-00001 403-10-150-51102-11106 $ 1,699.00 257407 10/22/2026 LIEBERT CASSIDY WHITMORE SEP 2026-LEGAL SRVC-BA020-00179 403-10-150-51102-11106 $ 518.00 257408 10/22/2026 LOS ANGELES COUNTY SHERIFFS DEPARTMENT AUG 2026-INMATE MEAL SERVICES 100-30-340-51101-00000 $ 528.00 257406 10/22/2026 LEONIECE ALLEN REFUND RENTAL DEPOSIT-SENIOR CENTER-10/16/26 501-60-000-22333-00000 $ 250.00 257407 10/22/2026 LIEBERT CASSIDY WHITMORE SEP 2026-LEGAL SRVC-BA020-00146 403-10-150-51102-11106 $ 664.30 257405 10/22/2026 KINGDOM CAUSES, INC. AUG 2026-DE MINIMIS 10%-ESPERANZA-HILDA SOLIS 270-60-690-53370-66028 $ 7,819.03 257405 10/22/2026 KINGDOM CAUSES, INC. AUG 2026-DE MINIMIS 10%-ESPERANZA-PLHA 270-60-690-53370-66028 $ 387.43 257405 10/22/2026 KINGDOM CAUSES, INC. AUG 2026-DE MINIMIS 10%-S. HOMES-MA 270-60-691-53370-66028 $ 362.82 257405 10/22/2026 KINGDOM CAUSES, INC. AUG 2026-OPERATIONAL COST-S. HOMES-MEASURE A 270-60-691-53370-66020 $ 3,628.18 257405 10/22/2026 KINGDOM CAUSES, INC. AUG 2026-OPERATIONAL COSTS-ESPERANZA-HILDA SOLIS 270-60-690-53370-66028 $ 78,190.42 257405 10/22/2026 KINGDOM CAUSES, INC. AUG 2026-DE MINIMIS 10%-S. HOMES-PLHA 270-60-691-53370-66028 $ 513.24 257405 10/22/2026 KINGDOM CAUSES, INC. AUG 2026-DE MINIMIS 10%-S. HOMES-HILDA SOLIS 270-60-691-53370-66028 $ 6,933.35 257405 10/22/2026 KINGDOM CAUSES, INC. AUG 2026-OPERATIONAL COSTS-S. HOMES-HILDA SOLIS 270-60-691-53370-66028 $ 69,333.55 257402 10/22/2026 JOSE ALEXSANDER RAMOS REFUND DEPOSIT-LEVEL 3 SWIM CLASS 100-60-000-42600-00000 $ 45.00 257403 10/22/2026 JUSTIN REISZ REIM-SUPPLIES FOR SENIOR CENTER 100-60-630-53100-00000 $ 185.96 257404 10/22/2026 KEYSTONE UNIFORMS UNIFROMS FOR CADET 100-30-310-53100-00000 $ 395.37 257399 10/22/2026 INTERACTIVE DATA, LLC ONLINE SEARCH SITE FOR DB CASES 100-30-360-51100-00000 $ 85.00 257400 10/22/2026 JOCELYN BADILLO REIM-SUPPLIES FOR SENIOR FASHION SHOW & PROM 110-60-630-53100-00000 $ 127.87 257401 10/22/2026 JORGE MEDINA REIM-SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 16.60 257397 10/22/2026 HELEN HERNANDEZ REIM-SUPPLIES FOR WINTER FEST 110-60-610-53100-16148 $ 42.40 257397 10/22/2026 HELEN HERNANDEZ REIM-SUPPLIES FOR ZOCALO PARK 110-60-685-53100-00000 $ 172.22 257398 10/22/2026 HUMBERTO RIVAS MUSIC ENTERTAINMENT-ZOCALO PARK-10/23/26 110-60-685-51101-00000 $ 1,038.00 257394 10/22/2026 FRONTIER COMMUNICATIONS ACT#0317985-PD PHONE-9/28-10/27/26 100-30-310-53403-00000 $ 355.09 257395 10/22/2026 GANAHL LUMBER COMPANY SUPPLIES FOR STREET LANDSCAPE 251-50-560-53100-00000 $ 11.04 257396 10/22/2026 GRAINGER, INC. SUPPLIES FOR BUILDING MAINTENANCE 100-60-620-53100-00000 $ 180.14 257392 10/22/2026 ENTERPRISE FM TRUST OCT 2026-LEASING EXPENSE FOR CITY VEHICLES 246-50-590-58140-15727 $ 4,158.43 257392 10/22/2026 ENTERPRISE FM TRUST OCT 2026-LEASING EXPENSE FOR CITY VEHICLES 254-50-590-58140-15727 $ 1,475.68 257393 10/22/2026 FRONTIER COMMUNICATIONS ACT#0507995-PD PHONE-10/7-11/6/26 100-30-310-53403-00000 $ 107.38 257392 10/22/2026 ENTERPRISE FM TRUST SEP 2026-LEASING EXPENSE FOR CITY VEHICLES 246-50-590-58140-15727 $ 4,139.71 257392 10/22/2026 ENTERPRISE FM TRUST SEP 2026-LEASING EXPENSE FOR CITY VEHICLES 254-50-590-58140-15727 $ 1,469.03 257392 10/22/2026 ENTERPRISE FM TRUST OCT 2026-TOLL FEE FOR POLICE DEPARTMENT 100-30-360-51101-00000 $ 44.55 257391 10/22/2026 EL RINCON DEL SABOR POBLANO LLC CATERING SRVC-INDEPENDENCE DAY CELEBRATION-7/1/26 501-60-000-22327-00000 $ 1,214.40 257391 10/22/2026 EL RINCON DEL SABOR POBLANO LLC CATERING SRVC-MEXICAN INDEPENDENCE DAY-9/15/26 501-60-000-22327-00000 $ 1,269.48 257392 10/22/2026 ENTERPRISE FM TRUST SEP 2026-TOLL FEE FOR POLICE DEPARTMENT 100-30-360-51101-00000 $ 14.50 257388 10/22/2026 CORODATA RECORDS MANAGEMENT, INC. SEP 2026-STORAGE OF FILES-CITY CLERK 100-10-120-51101-11431 $ 68.58 257389 10/22/2026 DATA TICKET, INC. SEP 2026-CITATION PROCESSING-ENT.#:0359 0704 100-30-392-51101-13104 $ 4,164.45 257390 10/22/2026 DOOLEY ENTERPRISES, INC. AMMO FOR PATROL 100-30-310-53100-00000 $ 4,186.09 257385 10/22/2026 CINTAS FIRST AID & SAFETY 1 ZOLL PLUS AED SEMI-AUTO AGREEMENT 403-10-160-51101-11350 $ 114.92 257386 10/22/2026 CIVIC NEWS GROUP INC PUBLIC NOTICE-PLANNING COMMISSION MEETING-9/3/26 501-40-000-22335-00000 $ 309.76 257387 10/22/2026 CLAUDIA URBINA REFUND RENTAL DEPOSIT-SENIOR CENTER-10/10/26 501-60-000-22333-00000 $ 250.00 257385 10/22/2026 CINTAS FIRST AID & SAFETY 9 ZOLL PLUS AED AUTOMATIC AGREEMENT 403-10-160-51101-11350 $ 1,034.28 257385 10/22/2026 CINTAS FIRST AID & SAFETY 1 ZOLL PLUS AED AUTOMATIC AGREEMENT 403-10-160-51101-11350 $ 114.92 257385 10/22/2026 CINTAS FIRST AID & SAFETY 3 ZOLL PLUS AED AUTOMATIC AGREEMENT 403-10-160-51101-11350 $ 344.76 257382 10/22/2026 CHARM-TEX INC SUPPLIES FOR INMATES 100-30-370-53100-00000 $ 414.46 257383 10/22/2026 CHARTER COMMUNICATIONS DATA CONNECTION FOR RADIO SYSTEMS 10/11-11/10/26 100-30-310-53403-00000 $ 399.16 257384 10/22/2026 CHICAS GRAPHICS AND DESIGN BUSINESS CARDS FOR ENGINEERING ASSISTANT 240-50-510-53100-00000 $ 60.78 257380 10/22/2026 BPS TACTICAL, INC. TACTICAL VEST COVER FOR DETECTIVE 100-30-310-53100-00000 $ 791.96 257381 10/22/2026 CALIFORNIA BUILDING OFFICIALS 2026 CALBO EDUCATION WEEK-L. HUANG-10/26-10/29/26 100-40-450-53200-00000 $ 500.00 257381 10/22/2026 CALIFORNIA BUILDING OFFICIALS 2026 CALBO EDUCATION WEEK-L. HUANG-10/26-10/29/26 100-40-450-53200-00000 $ 175.00 257378 10/22/2026 BALDWIN PARK WOMAN'S CLUB YEARBOOK AD FOR 2026-2027 100-30-310-51101-00000 $ 35.00 257379 10/22/2026 BLACK & WHITE EMERGENCY VEHICLES, LLC REMOVE & INSTALL EXPANSION MODULE-UNIT #27-9/28/26 402-50-591-51101-00000 $ 833.73 257380 10/22/2026 BPS TACTICAL, INC. TACTICAL VEST COVER FOR DETECTIVE 100-30-310-53100-00000 $ 813.51 257377 10/22/2026 BALDWIN PARK FLOWERS & GIFTS FLOWERS-SENIOR CENTER PROM-10/2/26 110-60-630-53100-00000 $ 979.03 257377 10/22/2026 BALDWIN PARK FLOWERS & GIFTS TABLE OVERLAYS-SENIOR CENTER PROM-10/2/26 110-60-630-53100-00000 $ 80.00
Payment Number Payment Date Vendor Name Description (Item) Account Number Amount DFT0015680 10/15/2026 S.E.I.U. LOCAL 721 DUES: OCTOBER PP#21 100-00-000-21220-00000 $ 1.50 Grand Total: $ 1,868,886.97
DFT0015679 10/16/2026 AUL HEALTH BENEFIT TRUST NOV 2026 - RETIREE MIDAMERICA HRA ACH PAYMENT 100-25-299-50223-00000 $ 80,584.25 DFT0015680 10/15/2026 S.E.I.U. LOCAL 721 DUES: OCTOBER PP#21 100-00-000-21220-00000 $ 810.87 DFT0015680 10/15/2026 S.E.I.U. LOCAL 721 DUES: OCTOBER PP#21 100-00-000-21220-00000 $ 30.00 DFT0015665 10/15/2026 INTERNAL REVENUE SERVICE SOCIAL SECURITY PAYMENT 100-00-000-21200-00000 $ 8,800.68 DFT0015666 10/15/2026 INTERNAL REVENUE SERVICE MEDICARE PAYMENT 100-00-000-21201-00000 $ 27,318.20 DFT0015667 10/15/2026 STATE OF CALIFORNIA EMPLOYMENT STATE INCOME TAX PAYMENT 100-00-000-21202-00000 $ 38,681.17 DFT0015651 10/15/2026 EMPOWER RETIREMENT EMPOWER CITY PAID 100-00-000-21257-00000 $ 1,150.97 DFT0015652 10/15/2026 EMPOWER RETIREMENT EMPOWER CITY PAID 100-00-000-21257-00000 $ 2,550.00 DFT0015664 10/15/2026 INTERNAL REVENUE SERVICE FEDERAL INCOME TAX PAYMENT 100-00-000-21203-00000 $ 88,187.53 DFT0015647 10/15/2026 EMPOWER RETIREMENT DEFERRED COMP LOAN REPAYMENT 100-00-000-21231-00000 $ 162.77 DFT0015649 10/15/2026 EMPOWER RETIREMENT DEFERRED COMP LOAN REPAYMENT 100-00-000-21231-00000 $ 18.81 DFT0015650 10/15/2026 EMPOWER RETIREMENT EMPOWER CITY PAID 100-00-000-21257-00000 $ 3,550.00 DFT0015628 10/15/2026 EMPOWER RETIREMENT EMPOWER 100-00-000-21232-00000 $ 2,730.45 DFT0015629 10/15/2026 AMERICAN FIDELITY ASSURANCE COMPANY FSA - AMERICAN FIDELITY ASSURANCE COMPANY 100-00-000-21216-00000 $ 1,522.48 DFT0015646 10/15/2026 STATE DISBURSEMENT SDU - CHILD SUPPORT 100-00-000-21225-00000 $ 3,504.38
ITEM NO: 2.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
PREPARED BY: Shirley Quinones, Chief Deputy City Clerk
DATE: November 4, 2026
SUBJECT: Meeting Minutes of October 21, 2026
SUMMARY:
The City Council held the following meetings on October 21, 2026; Regular City Council Meeting, Finance Authority Meeting and the Housing Authority Meeting.
RECOMMENDED ACTION:
It is recommended that the City Council approve the following meeting minutes of the Special City Council Meeting, Regular City Council Meeting, Finance Authority Meeting and Housing Authority Meeting.
FISCAL IMPACT:
There is no fiscal impact associated with this item.
BACKGROUND:
None
DISCUSSION:
None
ALTERNATIVES:
None
CEQA REVIEW:
None
LEGAL REVIEW:
This report does not require legal review.
ATTACHMENTS:
1. Meeting Minutes of October 21, 2026
CITY COUNCIL
SPECIAL MEETING
Minutes
October 21, 2026, 5:00 PM
Mayor
Mayor Pro Tem
Councilmember
Councilmember
Councilmember
Daniel Damian
Jean M. Ayala
Alejandra Avila
Emmanuel J. Estrada
Manuel Lozano
These minutes are presented in Agenda order.
CALL TO ORDER
The meeting was called to order at approximately 5:07 p.m. by Mayor Damian.
ROLL CALL
Mayor Damian announced that he is out sick with a cold and will be participating remotely from home under the Just Cause exemption in California Government Code § 54953.8.3(c)(2). He also reported there was no one in the room with him.
City Clerk Saenz performed roll call:
MEMBERS:
Councilmember Emmanuel Estrada (present)
Councilmember Manuel Lozano (present)
Mayor Pro Tem Jean M. Ayala (present)
Mayor Daniel Damian (present via teleconference)
Motion by Emmanuel Estrada, seconded by Manuel Lozano to excuse Alejandra Avila from the meeting.
Motion Passed [4-0] AYES: ESTRADA, LOZANO, AYALA, DAMIAN
PUBLIC COMMUNICATIONS
Mayor Damian opened Public Communications at approximately 5:09 p.m., seeing no one wishing to speak, public communications was closed.
OPEN SESSION/STUDY SESSION
RECESS CLOSED SESSION – CITY COUNCIL RECESSED TO CLOSED SESSION AT APPROXIMATELY 5:10 P.M.
1. Conference with Legal Counsel – Anticipated Litigation Pursuant to paragraph (2) of subdivision (d) of Government Code Section 54956.9:
Potential Case(s): Two (2)
No Reportable Action.
2. Conference with Real Property Negotiators
Pursuant to California Government Code, Section 54956.8 Property:
1. 13701 Olive Street, Baldwin Park, CA 91706
2. 13010 Wasco Street, Baldwin Park, CA 91706
No Reportable Action.
ADJOURNMENT
Mayor Damian adjourned the meeting at approximately 7:04 p.m.
APPROVED: November 4, 2026
Daniel Damian, Mayor
ATTEST:
Christopher Saenz, City Clerk
CITY COUNCIL
FINANCE AUTHORITY
HOUSING AUTHORITY
REGULAR MEETING
Minutes
October 21, 2026, 7:00 PM
Mayor
Mayor Pro Tem
Councilmember
Councilmember
Councilmember
Daniel Damian
Jean M. Ayala
Alejandra Avila
Emmanuel J. Estrada
Manuel Lozano
These minutes are presented in Agenda order.
CALL TO ORDER
The meeting was called to order at approximately 7:01 p.m. by Mayor Damian.
INVOCATION
The Invocation was given by Mayor Pro Tem Ayala.
PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Mayor Pro Tem Ayala.
ROLL CALL
Mayor Damian announced that he is out sick with a cold and will be participating remotely from home under the Just Cause exemption in California Government Code § 54953.8.3(c)(2). He also reported there was no one in the room with him.
City Clerk Saenz performed roll call:
MEMBERS:
Councilmember Alejandra Avila (present)
Councilmember Emmanuel Estrada (present)
Councilmember Manuel Lozano (present)
Mayor Pro Tem Jean M. Ayala (present)
Mayor Daniel Damian (present via teleconference)
REPORT FROM CLOSED SESSION
City Attorney Bettenhausen announced that the City Council met in closed session on the items listed on the Special Meeting Agenda, all Councilmembers were present except Councilmember Avila. He reported direction was given and there is no reportable action.
ANNOUNCEMENTS
The Mayor announced that the City Council are also members of the Board of Directors of the Housing Authority and Finance Authority which are concurrently convening with the City Council this evening and each Council Member is paid an additional stipend of $30 for attending the Housing Authority meeting and $50 for attending the Finance Authority meeting.
PROCLAMATIONS, COMMENDATIONS & PRESENTATIONS
Captain Hendricks presented a detailed review of the Flock Safety Review Program.
PUBLIC COMMUNICATIONS
Mayor Damian opened Public Communications at approximately 8:10 p.m., the following spoke:
1) Maribel Lopez 2) Jeanette Cardoza 3) Esthela Herrera 4) Amee Hnin 5) Josh Goldman 6) John Rios
7) Jay T (via zoom) 8) Joanne (via zoom)
Seeing no one else wishing to speak, public communications was closed.
CONSENT CALENDAR
1. City of Baldwin Park’s Warrants and Demands
Motion to ratify the attached Warrants and Demands Register.
MOTION: It was moved by Manuel Lozano, seconded by Jean M. Ayala to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
2. Treasurer's Report CC - August 2026
Motion to receive and file the Treasurer’s Report for August 2026.
MOTION: It was moved by Manuel Lozano, seconded by Jean M. Ayala to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
3. Meeting Minutes of October 7, 2026
Motion to approve the meeting minutes of the Special City Council and the Regular City Council, meetings held on October 7, 2026.
MOTION: It was moved by Manuel Lozano, seconded by Jean M. Ayala to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
4. Second Reading and Adoption of Ordinance No. 1530 to Amend Section 30.03 of the Baldwin Park Municipal Code Relating to Councilmember Salaries
Item #4 Pulled for further discussion
Motion to:
1. Adopt Ordinance No. 1530 entitled, “AN ORDINANCE OF THE CITY COUNCIL OF
THE CITY OF BALDWIN PARK, CALIFORNIA, AMENDING IN ITS ENTIRETY SECTION 30.03 (“COUNCILMEMBER SALARIES”) OF CHAPTER 30 (“CITY COUNCIL”) OF TITLE III (“ADMINISTRATION”) OF THE BALDWIN PARK
MUNICIPAL CODE TO INCREASE THE MONTHLY SALARY OF THE MAYOR AND
MEMBERS OF THE CITY COUNCIL PURSUANT TO GOVERNMENT CODE SECTION 36516”; and
2. Authorize the Director of Finance to make the appropriation and necessary budget adjustments.
MOTION: It was moved by Emmanuel Estrada, seconded by Manuel Lozano to adopt.
Motion Passed [3–2]. AYES: ESTRADA, LOZANO, AYALA; NOES: AVILA, DAMIAN
5. Request Consideration and Approval for Measure BP Funding for Barnes Park Surveillance System
Motion to:
1. Consider approving $259,000 from Measure BP funding for the Barnes Park Surveillance System; and
2. Authorize the Director of Finance to make the necessary appropriation and budget adjustments.
MOTION: It was moved by Daniel Damian, seconded by Alejandra Avila to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
CITY COUNCIL ACTING AS SUCCESSOR AGENCY OF THE DISSOLVED COMMUNITY
DEVELOPMENT COMMISSION CONSENT CALENDAR
6. Successor Agency to The Dissolved Community Development Commission of The City of Baldwin Park Warrants and Demands
Motion to ratify the attached Warrants and Demands Register.
MOTION: It was moved by Manuel Lozano, seconded by Jean M. Ayala to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
7. Treasurer's Report SA - August 2026
Motion to receive and file the Treasurer’s Report for August 2026.
MOTION: It was moved by Manuel Lozano, seconded by Jean M. Ayala to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
FINANCE AUTHORITY CONSENT CALENDAR
8. Treasurer's Report FA - August 2026
Motion to receive and file the Treasurer’s Report for August 2026.
MOTION: It was moved by Manuel Lozano, seconded by Jean M. Ayala to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
HOUSING AUTHORITY CONSENT CALENDAR
9. Treasurer's Report HA - August 2026
Motion to receive and file the Treasurer’s Report for August 2026.
MOTION: It was moved by Manuel Lozano, seconded by Jean M. Ayala to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
10. Baldwin Park Housing Authority’s Warrants and Demands Motion to ratify the attached Warrants and Demands Register.
MOTION: It was moved by Manuel Lozano, seconded by Jean M. Ayala to adopt.
Motion Passed [4–0-1]. AYES: AVILA, ESTRADA, LOZANO, AYALA; ABSTAIN: DAMIAN
REPORTS OF OFFICERS
11. Approval of Revised Conceptual Design for the Teri G. Muse Family Service Center Motion to continue to a date not certain.
MOTION: It was moved by Manuel Lozano, seconded by Jean M. Ayala to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
12. Consideration of First Amendment to the Employment Agreement of the Chief Executive Officer – Manuel Carrillo Jr.
Motion to:
1. Approve the First Amendment to the Employment Agreement of the Chief Executive Officer, Manuel Carrillo Jr.
2. Authorize the Director of Finance to make the appropriation and necessary budget adjustments.
MOTION: It was moved by Jean M. Ayala, seconded by Emmanuel Estrada to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
13. Consideration of Appointments to Fill the Scheduled Vacancy for Measure BP Stakeholders Oversight Committee (SOC) - Lottery Selection Process
Motion to certify the selection of the two (2) SOC members upon competition of the lottery.
MEASURE BP STAKEHOLDERS OVERSIGHT COMMITTEE (SOC)
Two (2) Measure BP Stakeholder Oversight Committee Baldwin Park Resident Seats are open.
Applications received from:
1. Annaimee Cox
2. Teresa Renteria
3. Ruth Ginette Rocha
4. Gustavo Trujillo Jr
A lottery selection process was conducted by a virtual pinwheel listing the names of the applicants.
The selected are as follows:
1) Gustavo Trujillo Jr.
2) Teresa Renteria
MOTION: It was moved by Alejandra Avila, seconded by Manuel Lozano to adopt.
Motion Passed [5–0]. AYES: AVILA, ESTRADA, LOZANO, AYALA, DAMIAN
CITY COUNCIL / CITY CLERK / CITY TREASURER / STAFF REQUESTS & COMMUNICATION Councilmember Estrada sought consensus of the City Council to direct staff to bring back staff report for discussion on adding a Youth Board seat to the Measure BP Stakeholders Committee.
Councilmember Avila sought consensus of the City Council to get an update regarding the ban on the Data Centers.
ADJOURNMENT
Mayor Damian adjourned the meeting at approximately 9:46 p.m.
APPROVED: November 4, 2026
Daniel Damian, Mayor
ATTEST:
Christopher Saenz, City Clerk
ITEM NO: 3.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
PREPARED BY: Diana Sanapanya, Human Resources Analyst II DATE: November 4, 2026
SUBJECT: Claim Rejection
SUMMARY:
This report seeks City Council consideration and direction to reject the Claim for Damages to person or property received for filing against the City of Baldwin Park.
RECOMMENDED ACTION:
It is recommended that the City Council reject the following claim and direct staff to send the appropriate notice of rejection to claimant:
• Miguel Angel Guerrero Claimant alleges bodily injury and property damage. • Jaime Marquez Claimant alleges past and future economic and non-economic losses.
This government claim, and all government claims, should be considered as potential lawsuits in the future. Thus, it is requested that all City Staff, the Mayor and all Council Members refrain from making any statements, whether public or private in nature. It is important that no statements be made so as to not prejudice this claim in any way which can happen if public or private comments are made about this claim by City staff or Council Members.
FISCAL IMPACT:
Fiscal impact is unknown at this time.
BACKGROUND:
In order for the statute of limitations to begin on the claim received, it is necessary for the City Council to reject the claim by order of motion and that the claimant is sent written notification of said action.
DISCUSSION:
None
ALTERNATIVES:
There are no other alternatives for the Council to consider since rejection of the claim is necessary for the Statute of Limitations to begin on the claim received.
CEQA REVIEW:
These actions are exempt from review under the California Environmental Quality Act (California Public Resources Code §§ 2100, et seq., “CEQA”) and CEQA regulations (14 California Code of Regulations §§ 15000, et seq.)
LEGAL REVIEW:
This report does not require legal review.
ATTACHMENTS:
None
ITEM NO: 4.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
PREPARED BY: Daniel Padilla, Director of Public Works
DATE: November 4, 2026
SUBJECT: Authorize Award of Contract to Act 1 Construction, Inc. to Construct Ana Montenegro Park
SUMMARY:
This item will authorize the award of a contract to construct Ana Montenegro Park to Act 1 Construction, Inc. in the amount of $3,790,000.00. Including a 10% contingency in the amount of $379,000.00, the total project cost is $4,169,000.00.
RECOMMENDED ACTION:
It is recommended that the City Council:
1. Approve and award the construction contract to construct Ana Montenegro Park to Act 1 Construction, Inc. in the amount of $3,790,000.00; and
2. Approve a 10% construction contingency in the amount of $379,000.00 for the project; and
3. Authorize the Mayor and City Clerk to execute the contract with Act 1 Construction, Inc.; and
4. Authorize the Director of Finance to make appropriations and budget adjustments to cover the awarded contract amount plus the contingency, and set up necessary account numbers.
FISCAL IMPACT:
There is no impact to the General Fund. The total project cost of $4,169,000.00 will be funded as follows:
Fund 270 Grant C9801280-01 State of CA Prop 68 – Per Capita $ 177,952.00 Fund 270 Grant C9802081-01 State of CA Prop 68 – Per Capita $ 46,336.00 Fund 270
Grant NTP NO. A0727001 Los Angeles County Regional
Open Space Measure A $ 3,300,000.00
Fund 110 City Measure BP $ 644,712.00
Total $ 4,169,000.00
BACKGROUND:
In late 2022, the City acquired the 8,342-square-foot parcel for the purpose of building a mini-park or pocket park and addressing issues of equity and environmental justice in the northern quadrant of the City. The park was named after former Baldwin Park City Treasurer Ana Montenegro, one of the first Latinas elected to public office in California and a dedicated local teacher. The City previously (Spring 2026) hired FS Contractors, Inc. to construct perimeter block walls and the sewer lateral to serve the restroom building. The City also had two water meters installed in preparation of the park construction.
DISCUSSION:
On October 27, 2026, a total of twelve (12) bids were received. The lowest responsive and responsible bid was from Act 1 Construction, Inc. of Norco, California. Staff recommends that the City Council move forward with the award of the construction contract for this project.
At their November 1, 2023, City Council Meeting, the City Council awarded an agreement to David Volz & Associates for professional design services for the Ana Montenegro Park CIP24-035-56012. This decision marked the official launch of the design phase for the park, which aims to reflect community priorities and honor the legacy of Mrs. Ana Montenegro.
To gather input on the park's amenities and design, staff conducted several community engagement meetings that were actively promoted on all city social media platforms, including a press release and the city’s website.
Additionally, Active San Gabriel Valley supported these efforts by canvassing in the immediate project area to encourage residents to participate in the meetings. As a result of these outreach efforts, two (2) conceptual renderings were developed based on feedback from the community design meetings. Mrs. Ana Montenegro’s family attended several of these meetings, offering crucial insights that inspired key elements of the park’s design.
Once the two conceptual designs were completed, shared through community engagement meetings and at various events to ensure continued engagement and gather additional input.
Community members actively participated in prioritizing their preferred designs, playing a vital role in shaping the final concept. Active San Gabriel Valley's collaboration was instrumental in conducting outreach and engaging project area residents to review the two (2) concepts and share their insights.
This comprehensive outreach effort provided multiple platforms for stakeholders to express their perspectives and contribute to the park’s development. The conceptual design being presented integrates the majority of community suggestions while adhering to best practices. These collective efforts have culminated in a design that reflects the community’s vision and honors the legacy of Mrs. Ana Montenegro. The design draws profound inspiration from Mrs. Montenegro's illustrious career as a dedicated Public Educator and her unwavering passion for the arts. It intricately weaves elements that celebrate her admiration for the rich heritage of Pre-Columbian artistry and the vibrant, intricate patterns of Talavera pottery, creating a harmonious blend of history, culture, and education.
These influences shine through in the park's vibrant color palette and intricate aesthetics, fostering a cohesive and culturally enriched atmosphere that infuses every space. Main features of the park include vibrant public art papel picado shade structures, alebrije serpentine tower playground with Talevera-inspired pour-in-place rubberized flooring, an iconic monumental park sign, cloud-based surveillance system, bike repair station, hydration fountain, seat walls adorned with colorful mosaic tiles and energy-efficient LED security lighting. Additional amenities enhance accessibility and appeal, such as a welcoming entry gate, perimeter fencing, drought-tolerant landscaping, and restrooms designed in Spanish-style architecture. The proposed design is fully compliant with the Americans with Disabilities Act (ADA), ensuring inclusivity for all visitors. The design thoughtfully integrates extensive community feedback, ensuring the park reflects the needs and aspirations of its residents. Together, these elements celebrate heritage, community, and the arts, creating a vibrant and dynamic space for everyone to enjoy.
ALTERNATIVES:
1. The City Council may choose not to award a construction contract, reject all bids and re-bid the project.
2. Provide Staff with alternate direction.
CEQA REVIEW:
The Project is being implemented by the City to address the City’s environmental efforts and expand recreational facilities. This Project aims to install three bio-infiltration systems that have the ability to capture the first 85th percentile stormwater volume produced on the site and infiltrate flows into the ground within 72 hours. The City
is committed to maximizing community benefits through the Project. Amenities are expected to include a pre-Columbian and Spanish-designed playground, shade structure, shade sails, benches, a drinking fountain, native landscaping, a restroom facility, walkways, solar lighting, and perimeter fences, walls, and gates. The park will also include approximately five new large shade trees. The conceptual Site Plan is included as Attachment 6.
The Project goals are summarized as follows:
• Increase recreational park space
• Maximize community benefits
• Minimize disruption to residents and local businesses • Incorporate community-based input
Pursuant to the California Environmental Quality Act (CEQA), the City of Baldwin Park (“City”) prepared a Draft Initial Study/Mitigated Negative Declaration (IS/MND) to identify potential site-specific environmental constraints associated with the Baldwin Park Ana Montenegro Park Project (Project) (APN 8536-016-902). The Draft Initial Study determined that the project could result in potentially significant impacts to the following environmental topics: biological resources, cultural resources, energy, geology/soils, noise, and tribal cultural resources. Since all potentially significant impacts could be fully mitigated, the project qualifies for a Mitigated Native Declaration (MND) and therefore would not require the preparation of an Environmental Impact Report (EIR) pursuant to CEQA.
On August 20, 2025, the city released for public review the Draft IS/MND for the project pursuant to Section 15105 of the State CEQA Guidelines. The public review and comment period for the Draft IS/MND began on August 21, 2025 and closed on September 20, 2025. The Draft IS/MND for the project was recorded with the Office of Planning and Research, and the Los Angeles County Recorder’s office, circulated to interested parties, and posted on the City’s website. As required by CEQA, a Notice of Completion form along with copies of the Draft IS/MND were sent to the State Clearinghouse soliciting review and comment on the report by the relevant State agencies. The State Clearinghouse subsequently assigned the following State Clearinghouse Number for the Draft IS/MND: 2025080925. It should be noted that the site plan included with the published IS/MND has been revised with minor edits and the current version of the site plan is attached as Attachment 6 to the October 15, 2025 staff report presented to the City Council.
The CEQA Appendix G Environmental (Initial Study) Checklist is included in Section 3. The checklist identifies potential environmental impacts by section and provides a brief discussion of each impact resulting from project implementation, with responses supported by sufficient data and analysis. During the public review period, comments were received from:
• Hereditary Chief Andrew Salas, Gabrieleño Band of Mission Indians - Kizh Nation • Patricia Horseley, Environmental Planner, Los Angeles County Sanitation District A Final IS/MND was prepared prior to the decision for this project being made by the City Council and this document formally addressed the comments from Hereditary Chief Andrew Salas, Gabrieleño Band of Mission Indians - Kizh Nation and Patricia Horseley, Environmental Planner, Los Angeles County Sanitation District.
Mitigation measures have been included with the Draft IS/MND that grants the Gabrieleño Band of Mission Indians - Kizh Nation paid monitoring during grading for the project. In response to the comment from the Los Angeles County Sanitation District, a condition of approval was included for this project to require payment of a connection fee to the Sanitation District to offset the impact of this project on the regional sewer system. An Environmental Impact Report (EIR) pursuant to CEQA is not required for the proposed project. The Final
IS/MND did not describe the project as having any new or substantially more severe impacts than those identified and analyzed in the Draft IS/MND. Therefore, in accordance with State CEQA Guidelines Section 15073.5, recirculation of a Draft IS/MND was not required.
The Final IS/MND is an informational document that (1) was considered by the City’s decisionmakers prior to approving the project, and (2) was required to reflect the Lead Agency’s independent judgment and analysis (CEQA Guidelines, Section 15090). The City adopted the IS/MND and approve the MMRP on October 15, 2025.
A copy of the Notice of Determination was filed by the County Clerk was sent to the State Clearinghouse.
LEGAL REVIEW:
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS:
1. Ana Montenegro Park Bid Summary 26-10-28
2. 01 Act 1 Construction, Inc.
3. Contract_Ana Montenegro Park
City of Baldwin Park
Public Works Engineering DivisionAna Montenegro Park ProjectCity Project No.24-035 Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 Mobilization (Not to Exceed 5%) LS 1 180,000.00$ 180,000.00$ 203,895.00$ 203,895.00 $ 250,000.00$ 250,000.00$ 116,000.00$ 116,000.00$ 200,000.00$ 200,000.00$ 150,057.00$ 150,057.00$ 220,000.00$ 220,000.00$ 19,687.35 $ 19,687.35$ 192,500.00$ 192,500.00$ 270,000.00$ 270,000.00$ 122,452.00$ 122,452.00$ 193,000.00$ 193,000.00$ 2 Temporary Construction Fencing LS 1 5,000.00$ 5,000.00$ 9,200.00$ 9,200.00$ 21,000.00$ 21,000.00$ 10,000.00$ 10,000.00$ 4,800.00$ 4,800.00$ 10,000.00$ 10,000.00$ 2,600.00 $ 2,600.00$ 13,800.64$ 13,800.64$ 2,200.00$ 2,200.00$ 15,000.00$ 15,000.00$ 2,364.00$ 2,364.00$ 25,000.00$ 25,000.00$ 3 Clearing and Grubbing LS 1 12,000.00$ 12,000.00$ 5,750.00$ 5,750.00$ 30,000.00$ 30,000.00$ 12,500.00$ 12,500.00$ 6,000.00$ 6,000.00$ 50,000.00$ 50,000.00$ 15,000.00$ 15,000.00$ 15,520.30$ 15,520.30$ 28,600.00$ 28,600.00$ 15,000.00$ 15,000.00$ 22,501.00$ 22,501.00$ 110,000.00$ 110,000.00$ 4 Remove Chain Link Fence and Gates LF 226 15.00$ 3,390.00$ 9.20$ 2,079.20$ 15.00$ 3,390.00$ 20.00$ 4,520.00$ 13.00$ 2,938.00$ 25.00$ 5,650.00$ 26.00$ 5,876.00$ 18.38$ 4,153.88$ 8.80$ 1,988.80$ 50.00 $ 11,300.00$ 13.00$ 2,938.00$ 40.00$ 9,040.00$ 5 Remove Existing Sidewalk SF 1,000 4.00$ 4,000.00$ 4.83$ 4,830.00$ 8.00$ 8,000.00$ 9.00$ 9,000.00$ 5.50$ 5,500.00$ 10.00$ 10,000.00$ 3.00$ 3,000.00$ 6.29$ 6,290.00$ 6.05$ 6,050.00$ 50.00$ 50,000.00$ 3.00$ 3,000.00$ 5.00$ 5,000.00$ 6 Erosion Control Implementation LS 1 4,500.00$ 4,500.00$ 6,836.75$ 6,836.75$ 12,000.00$ 12,000.00$ 12,500.00$ 12,500.00$ 28,000.00$ 28,000.00$ 5,000.00$ 5,000.00$ 6,500.00$ 6,500.00$ 13,407.78$ 13,407.78$ 15,400.00$ 15,400.00$ 75,000.00$ 75,000.00$ 8,064.00$ 8,064.00$ 28,000.00$ 28,000.00$ 7 Construction Surveying LS 1 20,000.00$ 20,000.00$ 28,750.00$ 28,750.00$ 42,000.00$ 42,000.00$ 40,000.00$ 40,000.00$ 25,000.00$ 25,000.00$ 15,000.00$ 15,000.00$ 30,000.00$ 30,000.00$ 29,347.25$ 29,347.25$ 38,500.00$ 38,500.00$ 30,000.00$ 30,000.00$ 32,304.00$ 32,304.00$ 30,000.00$ 30,000.00$ 8 Imported Material/Earthwork LS 1 75,000.00$ 75,000.00$ 131,570.93$ 131,570.93$ 142,400.00$ 142,400.00$ 89,000.00$ 89,000.00$ 60,000.00$ 60,000.00$ 50,000.00$ 50,000.00 $ 88,000.00$ 88,000.00$ 60,209.90$ 60,209.90$ 27,500.00$ 27,500.00$ 175,000.00$ 175,000.00$ 40,258.00$ 40,258.00$ 48,000.00$ 48,000.00$ 9 NDS 12" Black Grid Square Atrium Grate with U.V. Inhibitor EA 5 1,440.00$ 7,200.00$ 2,875.00$ 14,375.00$ 1,600.00$ 8,000.00$ 1,400.00$ 7,000.00$ 400.00$ 2,000.00$ 1,000.00$ 5,000.00$ 1,000.00$ 5,000.00$ 260.30$ 1,301.50$ 1,375.00$ 6,875.00$ 1,500.00$ 7,500.00$ 476.00$ 2,380.00$ 1,000.00$ 5,000.00$ 10 NDS Square Grate with PVC Collar, 5" Satin Brass EA 5 1,200.00$ 6,000.00$ 2,300.00$ 11,500.00$ 1,000.00$ 5,000.00$ 2,500.00$ 12,500.00$ 1,150.00$ 5,750.00$ 2,000.00$ 10,000.00$ 765.00$ 3,825.00$ 195.23$ 976.15$ 1,650.00$ 8,250.00$ 3,000.00$ 15,000.00$ 389.00$ 1,945.00$ 1,000.00$ 5,000.00$ 11 Bioretention (including Grading, Unclassified Excavation, and Soil Layer) SF 460 27.00$ 12,420.00$ 16.10$ 7,406.00$ 90.00$ 41,400.00$ 85.00$ 39,100.00$ 32.00$ 14,720.00$ 50.00$ 23,000.00$ 41.00$ 18,860.00$ 24.95$ 11,477.00$ 33.00$ 15,180.00$ 250.00$ 115,000.00$ 31.00$ 14,260.00$ 110.00$ 50,600.00$ 12 4" SDR-35 Pipe LF 30 67.50$ 2,025.00 $ 149.50$ 4,485.00$ 120.00$ 3,600.00$ 299.00$ 8,970.00$ 50.00$ 1,500.00$ 100.00$ 3,000.00$ 80.00$ 2,400.00 $ 39.05$ 1,171.50$ 93.50$ 2,805.00$ 350.00$ 10,500.00$ 49.00$ 1,470.00$ 85.00$ 2,550.00$ 13 6" SDR-35 Pipe LF 190 60.00$ 11,400.00$ 161.00$ $30,570.00** 130.00$ 24,700.00$ 71.00$ 13,490.00$ 55.00$ 10,450.00$ 120.00$ 22,800.00 $ 78.00$ 14,820.00$ 43.66$ 8,295.40$ 99.00 $ 18,810.00$ 400.00$ 76,000.00$ 48.00$ 9,120.00$ 110.00$ 20,900.00$ 14 8" SDR-35 Pipe LF 70 64.00$ 4,480.00 $ 161.00$ 11,270.00$ 150.00$ 10,500.00$ 180.00$ 12,600.00$ 90.00$ 6,300.00$ 150.00$ 10,500.00$ 95.00$ 6,650.00$ 78.09$ 5,466.30$ 121.00$ 8,470.00$ 450.00$ 31,500.00$ 146.00$ 10,220.00$ 150.00$ 10,500.00$ 15 12" x 12" Drop Inlet per Jensen Model 121224 or Approved Equal EA 6 2,000.00$ 12,000.00$ 5,750.00$ 34,500.00$ 2,400.00$ 14,400.00$ 3,800.00$ 22,800.00$ 1,850.00$ 11,100.00$ 5,000.00$ 30,000.00$ 1,900.00 $ 11,400.00$ 780.91$ 4,685.46$ 4,950.00$ 29,700.00$ 5,000.00$ 30,000.00$ 1,391.00$ $5,564.00** 2,000.00$ 12,000.00$ 16 Curb Drain per SPPWC Std. Plan 150-4 EA 2 6,000.00$ 12,000.00$ 1,725.00$ 3,450.00$ 1,200.00$ 2,400.00$ 4,100.00$ 8,200.00$ 7,500.00$ 15,000.00$ 5,000.00$ 10,000.00$ 1,500.00$ 3,000.00$ 2,603.04$ 5,206.08$ 4,400.00$ 8,800.00$ 2,500.00$ 5,000.00 $ 953.00$ 1,906.00$ 5,000.00$ 10,000.00$ 17 8" Steel Sleeve LF 10 483.00$ 4,830.00 $ 575.00$ 5,750.00$ 100.00$ 1,000.00$ 450.00$ 4,500.00$ 180.00$ 1,800.00$ 200.00$ 2,000.00$ 170.00$ 1,700.00$ 97.61$ 976.10$ 385.00$ 3,850.00$ 500.00$ 5,000.00$ 150.00$ 1,500.00$ 350.00$ 3,500.00$ 18 1" PVC (Domestic) Water Line Service LS 1 12,500.00$ 12,500.00$ 41,400.00$ 41,400.00$ 16,200.00$ 16,200.00$ 13,500.00$ 13,500.00$ 12,350.00$ 12,350.00$ 10,000.00$ 10,000.00$ 8,500.00$ 8,500.00$ 9,356.66$ 9,356.66$ 22,000.00$ 22,000.00$ 90,000.00$ 90,000.00$ 55.00$ $4,950.00** 18,000.00$ 18,000.00$ 19 Sewer Line (6” to 4”) LS 1 11,500.00$ 11,500.00$ 17,250.00$ 17,250.00$ 14,400.00$ 14,400.00$ 7,900.00$ 7,900.00$ 3,500.00$ 3,500.00$ 10,000.00$ 10,000.00$ 3,000.00$ 3,000.00$ 9,356.66$ 9,356.66$ 11,000.00$ 11,000.00$ 90,000.00$ 90,000.00$ 53.00$ $2,120.00** 24,000.00$ 24,000.00$ 20 PCC Pedestrian Pavement (4" THK.) SF 1,550 22.00$ 34,100.00$ 14.38$ $22,281.25** 24.00$ 37,200.00$ 30.50$ 47,275.00$ 14.00$ 21,700.00$ 30.00$ 46,500.00$ 10.00$ 15,500.00$ 28.29$ 43,849.50$ 22.00$ 34,100.00$ 35.00$ 54,250.00$ 13.00$ 20,150.00$ 18.00$ 27,900.00$ 21 4" Thick Sidewalk over Native Per SPPWC Std. Plan No. 112-2 SF 1,300 15.00$ 19,500.00$ 12.94$ $16,818.75** 21.00$ 27,300.00$ 29.00$ 37,700.00$ 14.00$ 18,200.00$ 30.00$ 39,000.00$ 10.00$ 13,000.00$ 21.64$ 28,132.00$ 22.00$ 28,600.00$ 35.00$ 45,500.00$ 12.00$ 15,600.00$ 18.00$ 23,400.00$ 22 Ceramic Tile Paving SF 1,150 82.00$ 94,300.00$ 35.65$ 40,997.50$ 60.00$ 69,000.00$ 170.00$ 195,500.00$ 84.00 $ 96,600.00$ 100.00$ 115,000.00$ 120.00$ 138,000.00$ 76.39$ 87,848.50$ 159.50$ 183,425.00$ 175.00$ 201,250.00$ 146.00$ 167,900.00$ 35.00$ 40,250.00$ 23 Resilient Rubber Play Surface SF 3,400 44.00$ 149,600.00$ 43.69$ $148,540.90** 43.00$ 146,200.00$ 60.00$ 204,000.00$ 58.00$ 197,200.00$ 39.00$ 132,600.00$ 55.00$ 187,000.00$ 45.77$ 155,618.00$ 56.49$ $192,049.00** 50.00 $ 170,000.00$ 47.00$ 159,800.00$ 33.00$ 112,200.00$ 24 Flagstone LS 1 5,800.00$ 5,800.00$ 4,140.00$ 4,140.00$ 35,000.00$ 35,000.00$ 4,100.00$ 4,100.00$ 2,850.00$ 2,850.00$ 10,000.00$ 10,000.00$ 1,125.00$ 1,125.00$ 4,451.20$ 4,451.20$ 3,300.00$ 3,300.00$ 6,000.00$ 6,000.00$ 2,584.00$ 2,584.00$ 18,000.00$ 18,000.00$ 25 Rock Mulch SF 700 32.00$ 22,400.00$ 78,085.00$ $78,085.00** 30.00$ 21,000.00$ 59.00$ 41,300.00$ 53.00$ 37,100.00$ 50.00$ 35,000.00$ 45.00$ 31,500.00$ 29.70$ 20,790.00$ 132.00$ 92,400.00$ 15.00$ 10,500.00$ 12.00$ 8,400.00$ 45.00$ 31,500.00$ 26 12" Playground Concrete Band LF 75 110.00$ 8,250.00$ 71.88$ $5,390.00** 150.00$ 11,250.00$ 200.00$ 15,000.00$ 100.00$ 7,500.00$ 50.00$ 3,750.00$ 50.00$ 3,750.00$ 109.11$ 8,183.25$ 110.00$ 8,250.00$ 200.00$ 15,000.00$ 61.00$ 4,575.00$ 80.00$ 6,000.00$ 27 Stairs LS 1 29,400.00$ 29,400.00$ 8,564.05$ 8,564.05$ 29,000.00$ 29,000.00$ 35,500.00$ 35,500.00$ 28,000.00$ 28,000.00$ 30,000.00$ 30,000.00$ 20,000.00$ 20,000.00$ 20,653.37$ 20,653.37$ 40,147.80$ 40,147.80$ 75,000.00$ 75,000.00$ 14,398.00$ 14,398.00$ 22,000.00$ 22,000.00$ 28 11.5' Tall Masonry Retaining Wall (W-101) Stucco Finish LF 75 209.00$ 15,675.00$ 717.60$ 53,820.00$ 1,150.00$ 86,250.00$ 415.00$ 31,125.00$ 410.00$ 30,750.00$ 400.00$ 30,000.00$ 500.00$ 37,500.00$ 293.77$ 22,032.75$ 397.65$ 29,823.75$ 1,500.00$ 112,500.00$ 354.00$ 26,550.00$ 575.00$ 43,125.00$ 29 11.5' Tall Masonry Retaining Wall (W-102) Stucco Finish LF 140 209.00$ 29,260.00$ 690.00$ 96,600.00$ 1,150.00$ 161,000.00$ 360.00$ 50,400.00$ 410.00$ 57,400.00$ 400.00$ 56,000.00$ 500.00$ 70,000.00$ 281.06$ 39,348.40$ 397.65$ 55,671.00$ 1,500.00$ 210,000.00$ 354.00$ 49,560.00$ 120.00$ 16,800.00$ 30 Poured-In-Place Concrete Wall (W-103) LF 110 400.00$ 44,000.00$ 230.00$ 25,300.00$ 1,200.00$ 132,000.00$ 950.00$ 104,500.00$ 720.00$ 79,200.00$ 300.00$ 33,000.00$ 615.00$ 67,650.00$ 588.06$ 64,686.60$ 638.00$ 70,180.00$ 600.00$ 66,000.00$ 715.00$ 78,650.00$ 600.00$ 66,000.00$ 31 Poured-In-Place Concrete Wall (W-105) LF 65 425.00$ 27,625.00$ 230.00$ 14,950.00$ 1,000.00$ 65,000.00$ 1,200.00$ 78,000.00$ 750.00$ 48,750.00$ 300.00$ 19,500.00$ 700.00$ 45,500.00$ 596.04$ 38,742.60$ 638.00$ 41,470.00$ 600.00$ 39,000.00$ 594.00$ 38,610.00$ 500.00$ 32,500.00$ 32 CMU Block Wall w/ Stucco Finish & Breeze Block w/ Precast Cap (W-106) LF 15 1,500.00$ 22,500.00$ 460.00$ 6,900.00$ 2,100.00$ 31,500.00$ 2,500.00$ 37,500.00$ 1,450.00$ 21,750.00$ 500.00$ 7,500.00$ 1,995.00$ 29,925.00$ 1,350.13$ 20,251.95$ 1,743.43$ $26,151.40** 1,500.00$ 22,500.00$ 2,306.00$ 34,590.00$ 350.00$ 5,250.00$ 33 Poured-In-Place Concrete Wall (W-107) LF 105 400.00$ 42,000.00$ 460.00$ $43,800.00** 1,000.00$ 105,000.00$ 898.00$ 94,290.00$ 720.00$ 75,600.00$ 300.00$ 31,500.00$ 785.00$ 82,425.00$ 566.05$ 59,435.25$ 524.86$ 55,110.30$ 600.00$ 63,000.00$ 486.00$ 51,030.00$ 600.00$ 63,000.00$ 34 Poured-In-Place Concrete Planter Wall (W-108) LF 90 300.00$ 27,000.00$ 277.15$ 24,943.50$ 1,000.00$ 90,000.00$ 398.00$ 35,820.00$ 600.00$ 54,000.00$ 300.00$ 27,000.00$ 340.00$ 30,600.00$ 304.65$ 27,418.50$ 230.39$ 20,735.10$ 350.00$ 31,500.00$ 167.00$ 15,030.00$ 640.00$ 57,600.00$ 35 Raised Concrete Planter LS 1 31,069.00$ 31,069.00$ 69,000.00$ 69,000.00$ 87,000.00$ 87,000.00$ 48,500.00$ 48,500.00$ 75,000.00$ 75,000.00$ 30,000.00$ 30,000.00$ 45,000.00$ 45,000.00$ 29,534.22$ 29,534.22$ 54,450.00$ 54,450.00$ 3,000.00$ $30,000.00** 34,621.00$ 34,621.00$ 34,000.00$ 34,000.00$ 36 Restroom Building LS 1 352,419.00$ 352,419.00$ 181,125.00$ 181,125.00$ 920,000.00$ 920,000.00$ 498,000.00$ 498,000.00$ 439,000.00$ 439,000.00 $ 250,000.00$ 250,000.00$ 424,000.00$ 424,000.00$ 410,407.98$ 410,407.98$ 569,313.13$ 569,313.13$ 685,043.00$ 685,043.00$ 616,041.00$ 616,041.00$ 250,000.00$ 250,000.00$ 37 18' x 18' Butterfly Shade EA 2 64,983.00$ 129,966.00$ 55,200.00$ 110,400.00$ 85,000.00$ 170,000.00$ 77,000.00$ 154,000.00$ 83,000.00$ 166,000.00$ 75,000.00$ 150,000.00$ 75,000.00$ 150,000.00$ 71,533.43$ 143,066.86$ 64,391.53$ 128,783.06$ 65,000.00$ 130,000.00$ 78,510.00$ 157,020.00$ 85,000.00$ 170,000.00$ 38 18' x 18' Butterfly Shade (Installation Only) EA 1 13,250.00$ 13,250.00$ 126,500.00$ 126,500.00$ 45,000.00$ 45,000.00$ 21,500.00$ 21,500.00$ 18,000.00$ 18,000.00$ 30,000.00$ 30,000.00$ 14,000.00$ 14,000.00$ 9,894.48$ 9,894.48$ 14,300.00$ 14,300.00$ 15,000.00$ 15,000.00$ 12,178.00$ 12,178.00$ 30,000.00$ 30,000.00$ 39 20' x 20' Butterfly Shade EA 2 72,635.00$ 145,270.00$ 64,400.00$ 128,800.00$ 85,000.00$ 170,000.00$ 78,000.00$ 156,000.00$ 97,850.00$ 195,700.00$ 90,000.00$ 180,000.00 $ 85,000.00$ 170,000.00$ 82,733.77$ 165,467.54$ 86,369.53$ $172,739.05** 70,000.00$ 140,000.00$ 90,050.00$ 180,100.00$ 92,000.00$ 184,000.00$ 40 Cantilevered Shade Canopy w/ Decorative Roof Panels EA 4 59,125.00$ 236,500.00$ 57,356.25$ 229,425.00$ 70,000.00$ 280,000.00$ 83,000.00$ 332,000.00$ 68,750.00$ 275,000.00$ 50,000.00$ 200,000.00$ 70,000.00$ 280,000.00$ 57,665.32$ 230,661.28$ 74,592.10$ 298,368.40$ 70,000.00$ 280,000.00$ 61,835.00$ 247,340.00$ 75,000.00$ 300,000.00$ 41 Handrail @ Stairs LF 20 700.00$ 14,000.00$ 402.50$ 8,050.00$ 200.00$ 4,000.00$ 3,100.00$ 62,000.00$ 230.00$ 4,600.00$ 500.00$ 10,000.00$ 1,600.00$ 32,000.00$ 503.18$ 10,063.60$ 594.00$ 11,880.00$ 250.00 $ 5,000.00$ 413.00$ 8,260.00$ 150.00$ 3,000.00$ 42 Tube Steel Fence - 7' Tall LF 195 600.00$ 117,000.00$ 460.00$ 89,700.00$ 290.00$ 56,550.00$ 298.00$ 58,110.00$ 320.00$ 62,400.00$ 300.00$ 58,500.00$ 450.00$ 87,750.00$ 483.12$ 94,208.40$ 341.00$ 66,495.00$ 350.00$ 68,250.00$ 461.00$ 89,895.00$ 320.00$ 62,400.00$ 43 Tube Steel Fence - 42" Tall LF 45 425.00$ 19,125.00$ 51.75$ 2,328.75$ 250.00$ 11,250.00$ 1,250.00$ 56,250.00$ 210.00$ 9,450.00$ 250.00$ 11,250.00$ 810.00$ 36,450.00$ 398.03$ 17,911.35$ 330.00$ 14,850.00$ 250.00$ 11,250.00$ 454.00$ 20,430.00$ 180.00$ 8,100.00$ 44 Entry Gate LS 1 49,000.00$ 49,000.00$ 17,250.00$ 17,250.00$ 4,500.00$ 4,500.00$ 9,800.00$ 98,000.00$ 63,000.00$ 63,000.00$ 50,000.00$ 50,000.00$ 55,000.00$ 55,000.00$ 87,834.31$ 87,834.31$ 24,200.00$ 24,200.00$ 10,000.00$ 10,000.00 $ 67,062.00$ 67,062.00$ 38,000.00$ 38,000.00$ 45 Play Equipment LS 1 1,428,329.00$ 1,428,329.00$ 1,917,050.00$ 1,917,050.00$ 1,720,000.00$ 1,720,000.00$ 1,889,000.00$ 1,889,000.00$ 1,581,130.00$ 1,581,130.00$ 1,450,000.00$ 1,450,000.00$ 1,620,000.00$ 1,620,000.00$ 1,500,655.98$ 1,500,655.98$ 1,562,000.00$ 1,562,000.00$ 1,500,000.00$ 1,500,000.00$ 1,667,235.00$ 1,667,235.00$ 1,300,000.00$ 1,300,000.00$ 46 Litter Receptacle EA 4 4,532.00$ 18,128.00$ 4,370.00$ 17,480.00$ 2,600.00$ 10,400.00$ 4,250.00$ 17,000.00$ 3,000.00$ 12,000.00$ 3,500.00$ 14,000.00$ 2,525.00$ 10,100.00$ 3,198.07$ 12,792.28$ 3,520.00$ 14,080.00$ 1,000.00$ 4,000.00$ 2,832.00$ 11,328.00$ 1,000.00$ 4,000.00$ 47 Large Seating Boulders EA 2 8,500.00$ 17,000.00$ 4,945.00$ 9,890.00$ 3,500.00$ 7,000.00$ 4,900.00$ 9,800.00$ 6,000.00$ 12,000.00$ 5,000.00$ 10,000.00$ 5,900.00$ 11,800.00$ 4,997.35$ 9,994.70$ 4,626.60$ 9,253.20$ 1,500.00$ 3,000.00$ 5,821.00$ 11,642.00$ 2,000.00$ 4,000.00$ 48 Precast Concrete Moon Bench with Mosaic Tile Inlay EA 4 12,000.00$ 48,000.00$ 18,400.00$ 73,600.00$ 6,000.00$ 24,000.00$ 18,500.00$ 74,000.00 $ 20,800.00$ 83,200.00$ 20,000.00$ 80,000.00$ 12,000.00$ 48,000.00$ 11,985.41$ 47,941.64$ 19,800.00$ 79,200.00$ 15,000.00$ 60,000.00$ 13,887.00$ 55,548.00$ 4,500.00$ 18,000.00$ 49 Bike Repair Stand and Outdoor Pump and Wheel Chock LS 1 2,000.00$ 2,000.00$ 5,060.00$ 5,060.00$ 4,800.00$ 4,800.00$ 5,250.00$ 5,250.00$ 6,750.00$ 6,750.00$ 10,000.00$ 10,000.00$ 3,730.00$ 3,730.00$ 5,365.27$ 5,365.27$ 3,850.00$ 3,850.00$ 10,000.00$ 10,000.00$ 4,908.00$ 4,908.00$ 6,800.00$ 6,800.00$ 50 Park Sign @ Wall W-107 LS 1 5,000.00$ 5,000.00$ 10,810.00$ 10,810.00$ 9,500.00$ 9,500.00$ 9,000.00$ 9,000.00$ 9,400.00$ 9,400.00$ 15,000.00$ 15,000.00$ 12,000.00$ 12,000.00$ 7,656.88$ 7,656.88$ 11,000.00$ 11,000.00$ 10,000.00$ 10,000.00$ 28,088.00$ 28,088.00$ 22,000.00$ 22,000.00$ 51 Entry Park Sign @ Wall W-103 LS 1 18,000.00$ 18,000.00$ 4,485.00$ 4,485.00 $ 10,500.00$ 10,500.00$ 19,800.00$ 19,800.00$ 4,000.00 $ 4,000.00$ 10,000.00$ 10,000.00$ 4,900.00$ 4,900.00$ 7,656.88$ 7,656.88$ 3,850.00$ 3,850.00$ 5,000.00$ 5,000.00$ 11,235.00$ 11,235.00$ 12,000.00$ 12,000.00$ 52 Soil Prep and Fine Grading SF 2,300 1.00$ 2,300.00$ 2.42$ $5,554.50** 2.00$ 4,600.00$ 10.25$ 23,575.00$ 1.80$ 4,140.00$ 1.00$ 2,300.00$ 2.00$ 4,600.00$ 2.17$ 4,991.00$ 2.75$ 6,325.00$ 1.00$ 2,300.00$ 0.75$ 1,725.00$ 2.00$ 4,600.00$ 53 Weed Abatement SF 2,300 1.00$ 2,300.00$ 0.12$ $264.50** 2.00$ 4,600.00$ 5.25$ 12,075.00$ 0.10$ 230.00$ 1.00$ 2,300.00$ 0.50$ 1,150.00$ 5.94$ 13,662.00$ 0.94$ $2,150.50** 1.00$ 2,300.00$ 0.82$ 1,886.00$ 1.00$ 2,300.00$ 54 Tree- 36" Box EA 1 1,213.00$ 1,213.00$ 2,530.00$ 2,530.00$ 4,000.00$ 4,000.00$ 4,500.00$ 4,500.00$ 1,475.00$ 1,475.00$ 1,500.00$ 1,500.00$ 2,500.00$ 2,500.00$ 1,983.27$ 1,983.27$ 1,716.00$ 1,716.00$ 1,500.00$ 1,500.00$ 3,203.00$ 3,203.00$ 2,000.00$ 2,000.00$ 55 Palm Tree - 8' BTH EA 3 4,545.00$ 13,635.00$ 18,728.90$ 18,728.90$ 6,000.00$ 18,000.00$ 19,800.00$ 59,400.00$ 13,000.00$ 39,000.00$ 5,000.00$ 15,000.00$ 10,000.00$ 30,000.00$ 17,369.56$ 52,108.68$ 7,584.50$ 22,753.50$ 10,000.00$ 30,000.00$ 11,131.00$ 33,393.00 $ 1,800.00$ 5,400.00$ 56 Shrub - 15 Gal EA 5 110.00$ 550.00$ 154.10$ 770.50$ 120.00$ 600.00$ 230.00$ 1,150.00$ 350.00$ 1,750.00$ 150.00$ 750.00$ 200.00$ 1,000.00 $ 340.87$ 1,704.35$ 209.00$ 1,045.00$ 150.00$ 750.00$ 163.00$ 815.00$ 350.00$ 1,750.00$ 57 Shrub - 7 Gal EA 9 57.00$ 513.00$ 189.75$ 1,707.75$ 65.00$ 585.00$ 250.00$ 2,250.00$ 78.00$ 702.00$ 120.00$ 1,080.00$ 185.00$ 1,665.00$ 185.93$ 1,673.37$ 187.00$ 1,683.00$ 100.00$ 900.00$ 105.00$ 945.00$ 200.00$ 1,800.00$ 58 Shrub - 5 Gal EA 141 46.00$ 6,486.00 $ 64.40$ 9,080.40$ 45.00$ 6,345.00$ 88.00$ 12,408.00$ 44.00$ 6,204.00$ 80.00$ 11,280.00$ 30.00$ 4,230.00$ 106.93$ 15,077.13$ 104.50$ 14,734.50$ 50.00$ 7,050.00$ 63.00$ 8,883.00$ 100.00$ 14,100.00$ 59 Shrub - 3 Gal EA 2 79.00$ 158.00$ 110.40$ 220.80$ 30.00$ 60.00$ 1,150.00$ 2,300.00$ 78.00$ 156.00$ 50.00$ 100.00$ 75.00$ 150.00$ 92.97$ 185.94$ 93.50$ 187.00$ 25.00$ 50.00$ 80.00$ 160.00$ 90.00$ 180.00$ 60 Shrub - 1 Gal EA 37 31.00$ 1,147.00$ 42.55$ 1,574.35$ 20.00$ 740.00$ 69.00$ 2,553.00$ 30.00$ 1,110.00$ 50.00$ 1,850.00$ 28.00$ 1,036.00$ 37.19$ 1,376.03$ 66.00$ 2,442.00$ 10.00$ 370.00$ 24.00$ 888.00$ 70.00$ 2,590.00$ 61 Shrub - 8" Pot EA 26 17.00$ 442.00$ 35.65$ 926.90$ 12.00$ 312.00$ 78.00$ 2,028.00$ 27.00$ 702.00$ 10.00$ 260.00$ 21.00$ 546.00$ 61.98$ 1,611.48$ 13.20$ 343.20$ 10.00$ 260.00$ 97.00$ 2,522.00$ 75.00$ 1,950.00$ 62 Wood Mulch (3" Layer) SF 1,650 1.00$ 1,650.00$ 1.73$ $2,846.25** 6.00$ 9,900.00$ 2.50$ 4,125.00$ 2.00 $ 3,300.00$ 5.00$ 8,250.00$ 2.50$ 4,125.00$ 1.18$ 1,947.00$ 0.99$ 1,633.50$ 2.00$ 3,300.00$ 0.36$ 594.00$ 2.00$ 3,300.00$ 63 90-Day Maintenance LS 1 1,200.00$ 1,200.00$ 5,520.00$ 5,520.00$ 2,000.00$ 2,000.00$ 6,000.00$ 6,000.00$ 7,500.00$ 7,500.00$ 5,000.00$ 5,000.00$ 7,500.00$ 7,500.00$ 10,693.33$ 10,693.33$ 5,280.00$ 5,280.00$ 10,000.00$ 10,000.00$ 10,985.00$ 10,985.00$ 2,500.00$ 2,500.00$ 64 Automatic Irrigation System LS 1 62,095.00$ 62,095.00$ 74,750.00$ 74,750.00 $ 65,000.00$ 65,000.00$ 82,000.00$ 82,000.00$ 53,800.00$ 53,800.00$ 50,000.00$ 50,000.00$ 75,000.00$ 75,000.00$ 73,775.15$ 73,775.15$ 69,632.20$ 69,632.20$ 75,000.00$ 75,000.00$ 52,549.00$ 52,549.00$ 45,000.00$ 45,000.00$ 65 Security Camera System Conduit (Data Connection, Cameras and Control Panel by Others) LS 1 16,000.00$ 16,000.00$ 57,552.90$ 57,552.90$ 45,000.00$ 45,000.00$ 18,900.00$ 18,900.00$ 18,100.00$ 18,100.00$ 20,000.00$ 20,000.00$ 25,000.00$ 25,000.00$ 21,208.95$ 21,208.95$ 18,700.00$ 18,700.00$ 30,000.00$ 30,000.00$ 19,661.00$ 19,661.00$ 42,000.00$ 42,000.00$ 66 Exterior Lighting LS 1 52,600.00$ 52,600.00 $ 110,937.05$ 110,937.05$ 65,000.00$ 65,000.00$ 48,500.00$ 48,500.00$ 33,000.00$ 33,000.00$ 20,000.00$ 20,000.00$ 38,000.00$ 38,000.00$ 19,966.71$ 19,966.71$ 31,900.00$ 31,900.00$ 25,000.00$ 25,000.00$ 21,229.00$ 21,229.00$ 140,000.00$ 140,000.00$ 67 Solar Lights (Installation Only) LS 1 12,000.00$ 12,000.00$ 46,000.00$ 46,000.00$ 56,000.00$ 56,000.00$ 17,980.00$ 17,980.00$ 31,000.00$ 31,000.00$ 100,000.00$ 100,000.00$ 27,000.00$ 27,000.00$ 62,265.92$ 62,265.92$ 62,700.00$ 62,700.00$ 50,000.00$ 50,000.00$ 23,843.00$ 23,843.00$ 58,000.00$ 58,000.00$ Mobilization (Not to
Exceed 5%) 4.75% Mobilization (Not to Exceed 5%) 4.48% Mobilization (Not to Exceed 5%) 4.53% Mobilization (Not to Exceed 5%) 2.20% Mobilization (Not to Exceed 5%) 4.53% Mobilization (Not to Exceed 5%) 3.90% Mobilization (Not to Exceed 5%) 4.94% Mobilization (Not to Exceed 5%) 0.50% Mobilization (Not to Exceed 5%) 4.17% Mobilization (Not to Exceed 5%) 4.96% Mobilization (Not to Exceed 5%) 2.79% Mobilization (Not to Exceed 5%) 4.89% 11 Urban Habitat
73-555 Alessandro Drive
Palm Desert, CA 92260
$4,382,955.00
12 Leonida Builders, Inc
32023 Crown Valley Road
Acton, CA 93510
$3,949,385.00
10 The Nazerian Group
17514 Ventura Blvd #204
Encino, CA 91316
$5,444,123.00
9 Monet Construction, Inc
7610 Day St.
Tujunga, CA 91042
$4,611,728.98**
Bid Results 1
* The bid package does not provide wording for the bid item unit prices. ** The bid item total amount contains a discrepancy. If necessary, the contractor shall confirm the correct total amount based on the bid unit price and quantity.
ITEM
NO. Work Description
Act 1 Construction, Inc.
444 Sixth St.
Norco, CA 92860
Estimated
Quantity
$3,790,000.00
City Project No. 24-035 Ana Montenegro Park
Project
Unit
Total
Western State Builders, Inc.
445 N Twin Oaks Valley Rd
San Marcos, CA 92069
$3,937,471.74
86 Golden Sun Enterprise, Inc.
6732 White Oak Ave
Van Nuys, CA 91406
$3,846,777.00
7 KASA Construction, Inc.
15148 Sierra Bonita Lane
Chino, CA 91710
$4,451,838.00
42 $4,547,895.80**
PUB Construction, Inc.*
23545 Palomino Dr. #104
Diamond Bar, CA 91765
$4,412,107.00
5 Three Peaks Corp.
P.O. Box 101
Calimesa, CA 92320
Aguilar & Calderon Corp.
PO BOX 1511
Whittier, CA 90609
$5,264,044.00
3 Bedrock Group, Inc.
2222 Foothill Blvd., Suite E531
La Canada, CA 91011
$5,514,332.00
D-1
CONTRACT SERVICE AGREEMENT FOR
City Project No. CIP 24-035
Ana Montenegro Park Project
THIS CONTRACT SERVICES AGREEMENT (herein "Agreement"), is made and entered into this 4th day of November, 2026 by and between the CITY OF BALDWIN PARK, a municipal corporation, (herein "City") and ACT 1 CONSTRUCTION, INC. (herein "Contractor"). The parties hereto agree as follows:
R E C I T A L S
A. City requires the Ana Montenegro Park Project improvements to be constructed in accordance with the Project Specifications, approved plans, applicable codes and regulations, and generally accepted industry standards. Contractor has represented to City that Contractor is qualified and experienced to perform the required work and has submitted a proposal to City for the same.
B. City desires to have Contractor perform said services on the terms and conditions set forth herein.
NOW, THEREFORE, based on the foregoing Recitals and for good and valuable consideration, the receipt and sufficiency of which is acknowledged by both parties, City and Contractor hereby agree as follows:
1. SERVICES OF CONTRACTOR
1.1 Scope of Services – In compliance with all terms and conditions of this Agreement, the Contractor shall provide those services specified in the Special and Technical Provisions, which services may be referred to herein as the "services" or "work" hereunder. As a material inducement to the City entering into this Agreement, Contractor represents and warrants that Contractor is a provider of first class work and services and Contractor is experienced in performing the work and services contemplated herein and, in light of such status and experience, Contractor covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be of good quality, fit for the purpose intended.
1.2 Documents Included in Contract – This contract consists of the Bid Documents, Proposal or quote dated October 27, 2026, Tax Identification Form, Workers’ Compensation Certification, and any and all schedules and attachments to it which are incorporated as if fully set forth herein.
In the event of an inconsistency, this Agreement shall govern.
1.3 Compliance with Law – All services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental agency having jurisdiction in effect at the time service is rendered.
D-2
1.4 Licenses, Permits, Fees, and Assessments – Contractor shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Contractor's performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City against any such fees, assessments, taxes penalties or interest levied, assessed or imposed against City hereunder.
Contractor shall be responsible for all sub-contractors' compliance with this Section.
1.5 Familiarity with Work – By executing this Contract, Contractor warrants that Contractor (a) has thoroughly investigated and considered the scope of services to be performed, (b) has carefully considered how the services should be performed, and (c) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement.
If the services involve work upon any site, Contractor warrants that Contractor has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder. Should the Contractor discover any latent or unknown conditions, which will materially affect the performance of the services hereunder, Contractor shall immediately inform the City of such fact and shall not proceed except at Contractor's risk until written instructions are received from the Contract Officer.
1.6 Care of Work – The Contractor shall adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as may be caused by City's own negligence.
1.7 Further Responsibilities of Parties – Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified, neither party shall be responsible for the service of the other. Contractor shall require all sub-contractors to comply with the provisions of this agreement.
1.8 Additional Services – City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Services or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written change order is first given by the Contract Officer to the Contractor, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Contractor. Any increase in compensation of twenty-five percent (25%) or less of the Contract Sum, or in the time to perform of one hundred eighty (180) days or less may be approved by the Contract Officer. Any greater increases, taken either separately or cumulatively must be approved by the City Council. It is expressly understood by Contractor that the provisions of this Section shall not apply to services specifically set forth in the Scope of Services or reasonably contemplated therein. Contractor hereby acknowledges that it accepts the risk that the services
D-3
to be provided pursuant to the Scope of Services may be more costly or time consuming than Contractor anticipates and that Contractor shall not be entitled to additional compensation therefore.
1.10 Prevailing Wages Laws – In accordance with Labor Code Section 1770 et seq., the director of the Department of Industrial Relations of the State of California has ascertained a general prevailing rate of wages, which is the minimum amount, which shall be paid to all workers employed to perform the work pursuant to this Agreement. A copy of the general prevailing wage rate determination is on file in the office of the City Clerk and is hereby incorporated in this Agreement. In accordance with the provisions of Labor Code Section 1810 et seq., eight (8) hours is the legal working day. Contractor must forfeit to the City Twenty Five Dollars ($25.00) a day for each worker who works in excess of the minimum working hours when Contractor does not pay overtime. Contractor is required to post a copy of such wage rates at all times at the contract site. The statutory penalties for failure to pay prevailing wage or to comply with State wage and hour laws will be enforced. Contractor also shall comply with State law requirements to maintain payroll records and shall provide for certified records and inspection of records as required by California Labor Code Section 1770 et seq., including Section 1776. Contractor shall comply with all statutory requirements relating to the employment of apprentices.
2. COMPENSATION
2.1 Contract Sum – For the services rendered pursuant to this Agreement, the Contractor shall be compensated a not to exceed amount of three million, seven hundred, ninety thousand dollars ($3,790,000.00) (herein "Contract Sum"), except as provided in Section 1.8. The Contract Sum shall include the attendance of Contractor at all project meetings reasonably deemed necessary by the City; Contractor shall not be entitled to any additional compensation for attending said meetings.
2.2 Progress Payments - Prior to the first day of the month, during the progress of the work, commencing on the day and month specified in the Agreement, Contractor shall submit to the Contract Officer a complete itemized statement of all labor and materials incorporated into the work during the preceding month and the portion of the contract sum applicable thereto. Upon approval in writing by the Contract Officer, payment shall be made in thirty (30) days. City shall pay Contractor a sum based upon ninety five percent (95%) of the contract price apportionment of the labor and materials incorporated into the work under the contract during the month covered by said statement. The remaining five percent (5%) thereof shall be retained as performance security. Refer to Section 7.3 of this Agreement for retention of funds.
3. PERFORMANCE SCHEDULE
3.1 Time of Essence – Time is of the essence in the performance of this Agreement. Contractor shall complete work within 90 Working Days, and shall begin work on February 22, 2027, or as soon as feasible after contract execution.
D-4
3.2 Schedule of Performance – Contractor shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the "Schedule of Performance" attached hereto as Exhibit "A", if any, and incorporated herein by this reference. When requested by the Contractor, the Contract Officer may approve extensions to the time period(s) specified in the Schedule of Performance in writing.
3.3 Force Majeure – The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Contractor shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes for the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer's determination shall be final and conclusive upon the parties to this Agreement.
3.4 Term – Unless earlier terminated in accordance with Section 7.8 of this Agreement, this Agreement shall continue in full force and effect until final approval and acceptance of the project by the Contract Officer.
4. COORDINATION OF WORK
4.1 Representative of Contractor – The following principals of Contractor are hereby designated as being the principals and representatives of Contractor authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith:
Don Trenholm
Act 1 Construction, Inc.
444 Sixth St
Norco, CA 92860
It is expressly understood that the experience, knowledge, capability and reputation of the foregoing principals were a substantial inducement for City to enter into this Agreement.
Therefore, the foregoing principals shall be responsible during the term of this Agreement for directing all activities of Contractor and devoting sufficient time to personally supervise the services hereunder. For purposes of this Agreement, the foregoing principals may not be replaced nor may their responsibilities be substantially reduced by Contractor without the express written approval of City.
D-5
4.2 Contract Officer – The Contract Officer shall be such person as may be designated by the City Manager or City Engineer. It shall be the Contractor's responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and the Contractor shall refer any decisions, which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.
4.3 Prohibition Against Assignment – The experience, knowledge, capability and reputation of Contractor, its principals and employees were a substantial inducement for the City to enter into this Agreement. Neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City.
4.4 Independent Contractor – Neither the City nor any of its employees shall have any control over the manner, mode or means by which Contractor, its sub-contractors, agents or employees, performs the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Contractor's employees, sub-contractors, servants, representatives or agents, or in fixing their number, compensation or hours of service. Contractor shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Contractor shall not at any time or in any manner represent that it or any of its sub-contractors, agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Contractor in its business or otherwise or a joint venture or a member of any joint enterprise with Contractor.
4.5 Identity of Persons Performing Work – Contractor represents that it employs or will employ at its own expense all personnel required for the satisfactory performance of any and all tasks and services set forth herein. Contractor represents that the tasks and services required herein will be performed by Contractor or under its direct supervision, and that all personnel engaged in such work shall be fully qualified and shall be authorized and permitted under applicable State and local law to perform such tasks and services.
4.6 Utility Relocation – City is responsible for removal, relocation, or protection of existing main or trunk line utilities to the extent such utilities were not identified in the invitation for bids or specifications. City shall reimburse contractor for any costs incurred in locating, repairing damage not caused by contractor and removing or relocating such unidentified utility facilities,
D-6
including equipment idled during such work. Contractor shall not be assessed liquidated damages for delay arising from the removal or relocation of such unidentified utility facilities.
4.7 Trenches or Excavations – Pursuant to California Public Contract Code Section 7104, in the event the work included in this Agreement requires excavations more than four (4) feet in depth, the following shall apply.
a) Contractor shall promptly, and before the following conditions are disturbed, notify City, in writing, of any: (1) material that Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; (2) Subsurface or latent physical conditions at the site different from those indicated; or (3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. b) City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the work shall issue a change order per Section 1.8 of this Agreement. c) That, in the event that a dispute arises between City and Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in Contractor’s cost of, or time required for, performance of any part of the work, Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract.
Contractor shall retain any and all rights provided either by contract or by law, which pertain to the resolution of disputes and protests between the contracting parties.
5. INSURANCE, INDEMNIFICATION AND BONDS
5.1 Insurance – The Contractor shall procure and maintain, at its sole cost and expense, in a form and content satisfactory to City, during the entire term of this Agreement including any extension thereof, the following policies of insurance:
Coverage (Check if applicable)
Minimum Limits
(X)
Comprehensive General Liability Insurance
(including premises and operations)
$2,000,000 per occurrence combined single limit
( )
Contractual Liability Insurance Products
Liability Insurance
$1,000,000 limit
D-7
(X)
Comprehensive Automobile Liability
Insurance (includes owned, non-owned,
and hired automobile hazard
$2,000,000 per occurrence combined single limit
( )
Professional Liability Insurance (providing
for a one year discovery period)
$1,000,000 limit
(X)
Workers' Compensation/Employers'
Liability Insurance
Statutory $2,000,000 per occurrence
CONDITIONS:
In accordance with Public Code Section 20170, the insurance of surety companies who provide or issue the policy shall have been admitted to do business in the State of California with a credit rating of “A” minus or better. This insurance shall not be canceled, limited in scope or coverage or non-renewed until after thirty (30) days prior written notice has been given to the City Engineer, City of Baldwin Park, 14403 East Pacific Avenue, Baldwin Park, California 91706.
Any insurance maintained by the City of Baldwin Park shall apply in excess of and not combined with insurance provided by this policy.
The City of Baldwin Park, its officers, employees, representatives, attorneys, and volunteers shall be named as additional named insureds.
Prior to commencement of any work under this contract, Contractor shall deliver to the City insurance endorsements confirming the existence of the insurance required by this contract, and including the applicable clauses referenced above. Such endorsements shall be signed by an authorized representative of the insurance company and shall include the signatory’s company affiliation and title. Should it be deemed necessary by the City, it shall be Contractor's responsibility to see that the City receives documentation, acceptable to the City, which sustains that the individual signing said endorsements, is indeed authorized to do so by the insurance company.
If the Contractor fails to maintain the aforementioned insurance, or secure and maintain the aforementioned endorsement, the City may obtain such insurance, and deduct and retain the amount of the premiums for such insurance from any sums due under the agreement. However, procuring of said insurance by the City is an alternative to other remedies the City may have, and is not the exclusive remedy for failure of Contractor to maintain said insurance or secure said endorsement. In addition to any other remedies the City may have upon Contractor's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to order Contractor to stop work hereunder, and/or withhold any payment(s) which became due to Contractor hereunder until Contractor demonstrates compliance with the requirements hereof.
Nothing herein contained shall be construed as limiting in any way the extent to which Contractor may be held responsible for payments of damages to persons or property resulting from Contractor's or its sub-contractor's performance of the work covered under this agreement.
D-8
Each contract between the Contractor and any sub-contractor shall require the sub-contractor to maintain the same policies of insurance that the Contractor is required to maintain pursuant to this Section 5.1.
5.2 Indemnification – Contractor shall indemnify the City, its officers, agents and employees against, and will hold and save them and each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities, (herein "claims or liabilities") that may be asserted or claimed by any person, firm or entity arising or alleged to arise out of or in connection with the negligent performance of the work, operations or activities of Contractor, its agents, employees, sub-contractors, or invitees, provided for herein, or arising or alleged to arise from the negligent acts or omissions of Contractor hereunder, or arising or alleged to arise from Contractor's negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, but excluding such claims or liabilities or portion of such claims or liabilities arising or alleged to arise from the negligence or willful misconduct of the City, its officers, agents or employees, and in connection therewith:
a) Contractor will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys' fees incurred in connection therewith;
b) Contractor will promptly pay any judgment rendered against the City, its officers, agents or employees for any such claims or liabilities arising or alleged to arise out of or in connection with Contractor’s (or its agents’, employees’, sub-contractors’, or invitees’) negligent performance of or failure to perform such work, operations or activities hereunder; and Contractor agrees to save and hold the City, its officers, agents, and employees harmless therefrom;
c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Contractor for such damages or other claims arising or alleged to arise out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Contractor hereunder, Contractor shall pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys' fees for counsel acceptable to City.
d) Contractor's duty to defend and indemnify as set out in this Section 5.2 shall include any claims, liabilities, obligations, losses, demands, actions, penalties, suits, costs, expenses or damages or injury to persons or property arising or alleged to arise from, in connection with, as a consequence of or pursuant to any state or federal law or regulation regarding hazardous substances, including but not limited to the Federal Insecticide, Fungicide and Rodenticide Act ("FIFRA"), Comprehensive Environmental Response, Compensation and Liability Act of 1980 ("CERCLA"), Resource
D-9
Conservation and Recovery Act of 1976 ("RCRA"), the Hazardous and Solid Waste Amendments of 1984, the Hazardous Material Transportation Act, the Toxic Substances control Act, the Clean Air Act, the Clean Water Act, the California Hazardous Substance Account Act, the California Hazardous Waste Control Law or the Porter-Cologne Water Quality Control Act, as any of those statutes may be amended from time to time.
The Contractor's indemnification obligations pursuant to this Section 5.2 shall survive the termination of this Agreement. Contractor shall require the same indemnification from all sub-contractors.
5.4 Sufficiency of Insurer or Surety – Insurance or bonds required by this Agreement shall be satisfactory only if issued by companies qualified to do business in California, rated "A" or better in the most recent edition of Best Rating Guide, The Key Rating Guide or in the Federal Register, and only if they are of a financial category Class VII or better, unless such requirements are waived by the Risk Manager of the City due to unique circumstances. In the event the Risk Manager of City ("Risk Manager") determines that the work or services to be performed under this Agreement creates an increased risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies and the performance bond required by this Section 5 may be changed accordingly upon receipt of written notice from the Risk Manager; provided that the Contractor shall have the right to appeal a determination of increased coverage by the Risk Manager to the City Council of City within ten (10) days of receipt of notice from the Risk Manager.
5.5 Substitution of Securities – Pursuant to California Public Contract Code Section 22300, substitution of eligible equivalent securities for any moneys withheld to ensure performance under the contract for the work to be performed will be permitted at the request and expense of the successful bidder.
6. RECORDS AND REPORTS
6.1 Reports – Contractor shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require. Contractor hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Contractor agrees that if Contractor becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein or, if Contractor is providing design services, the cost of the project being designed, Contractor shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto and, if Contractor is providing design services, the estimated increased or decreased cost estimate for the project being designed.
6.2 Records – Contractor shall keep, and require sub-contractors to keep, such books and records (including but not limited to payroll records as required herein) as shall be necessary to
D-10
perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of three (3) years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required.
6.3 Ownership of Documents – All drawings, specifications, reports, records, documents and other materials prepared by Contractor, its employees, sub-contractors and agents in the performance of this Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Contractor shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership of the documents and materials hereunder. Contractor may retain copies of such documents for its own use. Contractor shall have an unrestricted right to use the concepts embodied therein. All sub-contractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Contractor fails to secure such assignment, Contractor shall indemnify City for all damages resulting therefrom.
7. ENFORCEMENT OF AGREEMENT
7.1 California Law – This Agreement shall be construed and interpreted both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other appropriate court in such county, and Contractor covenants and agrees to submit to the personal jurisdiction of such court in the event of such action.
7.2 Disputes – In the event either party fails to perform its obligations hereunder, the non-defaulting party shall provide the defaulting party written notice of such default. The defaulting party shall have ten (10) days to cure the default; provided that, if the default is not reasonably susceptible to being cured within said ten (10) day period, the defaulting party shall have a reasonable time to cure the default, not to exceed a maximum of thirty (30) days, so long as the defaulting party commences to cure such default within ten (10) days of service of such notice and diligently prosecutes the cure to completion; provided further that if the default is an immediate danger to the health, safety and general welfare, the defaulting party shall take such immediate action as may be necessary. Notwithstanding the foregoing, the non-defaulting party may, in its sole and absolute discretion, grant a longer cure period. Should the defaulting party fail to cure the default within the time period provided in this Section, the non-defaulting party shall have the right, in addition to any other rights the non-defaulting party may have at law or in equity, to terminate this Agreement. Compliance with the provisions of this Section 7.2 shall be a condition precedent to bringing any legal action, and such compliance shall not be a waiver of any party's right to take legal action in the event that the dispute is not cured.
7.3 Retention of Funds – Progress payments shall be made in accordance with the provisions of Section 2.2 of this agreement. In accordance with said section, City shall pay Contractor a sum
D-11
based upon ninety five percent (95%) of the contract price apportionment of the labor and materials incorporated into the work under the contract during the month covered by said statement. The remaining five percent (5%) thereof shall be retained as performance security to be paid to the Contractor within sixty (60) days after final acceptance of the work by the City Council, after Contractor shall have furnished City with a release of all undisputed contract amounts if required by City. In the event there are any claims specifically excluded by Contractor from the operation of the release, the City may retain proceeds (per Public Contract Code 7107) of up to 150% of the amount in dispute. City’s failure to deduct or withhold shall not affect Contractor’s obligations hereunder.
7.4 Waiver – No delay or omission in the exercise of any right or remedy by a nondefaulting party on any default shall impair such right or remedy or be construed as a waiver. A party's consent to or approval of any act by the other party requiring the party's consent or approval shall not be deemed to waive or render unnecessary the other party's consent to or approval of any subsequent act. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement.
7.5 Rights and Remedies are Cumulative – Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party.
7.6 Legal Action – In addition to any other rights or remedies, either party may take legal action, law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement.
7.7 Liquidated Damages – Since the determination of actual damages for any delay in performance of this Agreement would be extremely difficult or impractical to determine in the event of a breach of this Agreement, the Contractor and its sureties shall be liable for and shall pay to the City liquidated damages for each working day of delay in the performance of any service required hereunder, as specified in subsection 6-9 of the Standard Specifications and the provisions of the Contract Specifications. In addition, liquidated damages may be assessed for failure to comply with the emergency call out requirements described in the scope of services.
The City may withhold from any moneys payable on account of services performed by the Contractor any accrued liquidated damages.
7.8 Termination for Default of Contractor – If termination is due to the failure of the Contractor to fulfill its obligations under this Agreement, Contractor shall vacate any City owned property which Contractor is permitted to occupy hereunder and City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Contractor shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments
D-12
to the Contractor for the purpose of setoff or partial payment of the amounts owed the City as previously stated.
7.9 Attorneys' Fees – If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney's fees. Attorney's fees shall include attorney's fees on any appeal, and in addition a party entitled to attorney's fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment.
8. CITY OFFICERS AND EMPLOYEES, NONDISCRIMINATION
8.1 Non-liability of City Officers and Employees – No officer or employee of the City shall be personally liable to the Contractor, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms of this Agreement.
8.2 Conflict of Interest – The Contractor warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement.
8.3 Covenant Against Discrimination – Contractor covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, marital status, national origin, or ancestry in the performance of this Agreement. To the extent required by law, contractor shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, marital status, national origin, or ancestry.
9. MISCELLANEOUS PROVISIONS
9.1 Notice - Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and shall be deemed to be given when served personally or deposited in the US Mail, prepaid, first-class mail, return receipt requested, addressed as follows:
To City: City of Baldwin Park
14403 East Pacific Avenue
Baldwin Park, California 91706
Attention: Public Works Department
To Contractor: Don Trenholm
Act 1 Construction, Inc.
D-13
444 Sixth St
Norco, CA 92860
9.2 Interpretation – The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply.
9.3 Integration; Amendment – It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in writing.
9.4 Severability – In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless.
9.5 Hiring of Illegal Aliens Prohibited – Contractor shall not hire or employ any person to perform work within the City of Baldwin Park or allow any person to perform work required under this Agreement unless such person is properly documented and legally entitled to be employed within the United States.
9.6 Unfair Business Practices Claims – In entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the contractor or sub-contractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.
Section 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body renders final payment to the contractor without further acknowledgment by the parties. (Section 7103.5, California Public Contract Code.)
9.7 Corporate Authority – The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound.
D-14
9.8 Legal Responsibilities – The Contractor shall keep itself informed of City, State, and Federal laws, ordinances and regulations, which may in any manner affect the performance of its services pursuant to this Agreement. The Contractor shall at all times observe and comply with all such laws, ordinances and regulations. Neither the City, nor their officers, agents, or employees shall be liable at law or in equity as a result of the Contractor’s failure to comply with this section.
9.9 Termination for Convenience – The City may terminate this Agreement without cause for convenience of the City upon giving contractor 30 days prior written notice of termination of the Agreement. Upon receipt of the notice of termination the Contractor shall cease all further work pursuant to the Agreement. Upon such termination by the City the Contractor shall not be entitled to any other remedies, claims, actions, profits, or damages except as provided in this paragraph. Upon the receipt of such notice of termination Contractor shall be entitled to the following compensation:
1. The contract value of the work completed to and including the date of receipt of the notice of termination, less the amount of progress payments received by contractor.
2. Actual move-off costs including labor, rental fees, equipment transportation costs, the costs of maintaining on-site construction office for supervising the mover-off.
3. The cost of materials custom made for this Agreement which cannot be used by the Contractor in the normal course of his business, and which have not been paid for by City in progress payments.
4. All costs shall not include any markups as might otherwise be allowed by any plans or specifications, which were a part of the Agreement.
The provisions of this paragraph shall supersede any other provision of the Agreement or any provision of any plans, specification, addendums or other documents, which are or may become a part of this Agreement. City and Contractor agree that the provisions of this paragraph are a substantive part of the consideration for this Agreement.
D-15
IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above.
CONTRACTOR: Act 1 Construction, Inc.
By: By:
(Print Name) (Print Name)
Signature: Signature:
Title: Title:
Address: 444 Sixth St. Address:
Norco, CA 92860
CITY OF BALDWIN PARK, a municipal corporation
By:
Daniel Damian, MAYOR
ATTEST: APPROVED AS TO FORM:
By: _______________________________________ __________________________________________ City Clerk City Attorney
ITEM NO: 5.
STAFF REPORT
TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
Okina Dor, Director of Community Development
PREPARED BY: Nick Baldwin, City Planner
DATE: November 4, 2026
SUBJECT: Appeal from Planning Commission denial of a project for development of a 5.22-acre property for a multi-family
residential project comprised of 20 two-story buildings and totaling 104 townhome apartment units. The project, if
approved, would require a General Plan Amendment, Zone
Change, Design Review, and Administrative Adjustment as well as the adoption of the IS-MND prepared for the project in compliance with the California Environmental Quality Act (CEQA) if approved (Location: 1314 LeBorgne Avenue, APNs 8558-023-905, 8558-023-910, and 8558-015-900:
Applicant: Storm Properties; Case Numbers: AGP 25-01, Z 25-01, PR 25-17, and AA 25-02).
SUMMARY:
The Applicant (Storm Properties) is appealing proposing to develop a 5.22-acre vacant property owned by Bassett Unified School District (BUSD) and adjacent to the former Florence Flanner elementary school buildings (Project). The Project development would consist of 20 two-story buildings for a total of 104 units. In order to proceed, the Applicant is seeking a General Plan Amendment, to change the land use designation from Open Space to Multi-Family Residential, a Zone change to change the zoning from Open Space (OS) to High-density Residential (R-3), an Administrative Adjustment to allow for a minor deviation from the building length standards, and a Design Review application. This Project was presented to the Planning Commission on July 22, 2026, and August 12, 2026, and it was their decision to recommend denial for the Project. The decision was appealed by the Applicant, and the Project is now before the City Council for a decision.
RECOMMENDED ACTION:
It is recommended that the City Council:
1. Conduct a public hearing.
2. Grant the appeal and
A. Find that the Mitigated Negative Declaration and the Initial Study-Mitigated Negative Declaration (IS-MND) as well as the associated Mitigation Monitoring and Reporting Plan (MMRP) was prepared in accordance with the California Environmental Quality Act (Pub. Resources Code, §§ 21000 et seq.) ("CEQA") and the State CEQA Guidelines (Cal. Code Regs, tit. 14, §§ 15000 et seq.) and adopt the IS-MND and MMRP for this Project.
B. Adopt Resolution No. 2026-030 APPROVING THE PROJECT FOR THE CONSTRUCTION OF 104
TOWNHOME APARTMENT UNITS, GENERAL PLAN AMENDMENT TO CHANGE THE LAND USE
DESIGNATION FROM OPEN SPACE TO RESIDENTIAL, A ZONE CHANGE TO CHANGE THE ZONING FROM OPEN SPACE (OS) TO HIGH-DENSITY RESIDENTIAL (R-3), AN ADMINISTRATIVE
ADJUSTMENT TO ALLOW FOR A MINOR DEVIATION FROM THE BUILDING LENGTH
STANDARDS, AND A DESIGN REVIEW APPLICATION.
C. Adopt Resolution No. 2026-031 AMENDING THE LAND USE DESIGNATION IN THE GENERAL
PLAN FROM OPEN SPACE TO MULTI-FAMILY RESIDENTIAL FOR THE PROPERTY LOCATED AT 1314 LEBORGNE AVENUE, ASSESSOR PARCEL NOS. 8558-023-905, 8558-023-910, AND 8558-015-900.
D. Adopt Ordinance No. 1531 AMENDING THE ZONING MAP FOR THE PROPERTY LOCATED AT 1314 LEBORGNE AVENUE, ASSESSOR PARCEL NOS. 8558-023-905, 8558-023-910, AND 8558-015-900 FROM OPEN SPACE (OS) TO HIGH-DENSITY RESIDENTIAL (R-3).
OR
3. Deny the appeal and adopt Resolution No. 2026-032 DENYING THE PROJECT FOR THE CONSTRUCTION OF 104 TOWNHOME APARTMENT UNITS, A GENERAL PLAN AMENDMENT TO CHANGE THE LAND
USE DESIGNATION FROM OPEN SPACE TO MULTI-FAMILY RESIDENTIAL, A ZONE CHANGE TO CHANGE THE ZONING FROM OPEN SPACE (OS) TO HIGH-DENSITY RESIDENTIAL (R-3), AN
ADMINISTRATIVE ADJUSTMENT TO ALLOW FOR A MINOR DEVIATION FROM THE BUILDING
LENGTH STANDARDS, AND A DESIGN REVIEW APPLICATION FOR THE PROPERTY LOCATED AT 1314 LEBORGNE AVENUE, ASSESSOR PARCEL NOS. 8558-023-905, 8558-023-910, AND 8558-015-900.
FISCAL IMPACT:
Should the Project be approved, the Project would require the payment of a number of fees to the City.
Development Impact Fees for parkland , flood control, Police Department, traffic congestion relief, public art, and General Plan/Technology as well as Building Permit fees would be paid in the estimated amount of $2,002,003. In addition, a sum of $457,997 would be paid to Bassett Unified School District for school fees. City property tax revenues would also increase. The site currently generates no property taxes because it is a school district parcel. If the appeal is denied, the City would not receive any of these fees or property taxes.
BACKGROUND:
The Florence Flanner Elementary School operated at the Project site from 1980 to 1989 (Dept. of Education website). Per the BUSD, the school was closed due to declining enrollment. During that time, the undeveloped portion of the campus that is the location of the proposed housing development was not developed and was not open to the public. Starting in 2022, the BUSD went through a lengthy public process to determine the best use for the site and in 2023, the Project applicant, Storm Properties, entered into an agreement with the BUSD to entitle the Project, construct the townhome apartments, and manage the property for the life of the lease agreement. After being selected as the developer, the Applicant in May 2025 performed additional public outreach until the Project was formally submitted in May 2025 (see Exhibit 2 re BUSD outreach and project selection). On July 22, 2026, the Planning Commission held a public hearing to consider the Project, the facts in the record and public testimony. At the conclusion of the hearing the Planning Commission voted to recommend to the City Council denial of the Project, and directed Staff to return with a resolution documenting their decision and findings. On August 12, 2026, the Planning Commission adopted Resolution PC 26-07 recommending denial of the Project based on the findings contained in the Resolution. The Applicant subsequently submitted a letter of appeal on August 19, 2026 (Exhibit 3).
PROJECT LAND USE AND ZONING
The Bassett Villas Project (Project) is located at 1314 Le Borgne and involves parcels with Assessor Parcel Numbers (APNs) of 8558-023-905, 8558-023-910, and 8558-015-900. The entire lot area of parcel APN 8558- 023-910 will be used for the Project, as well as a portion of parcel APN 8558-023-905. The remaining portion of parcel APN 8558-023-905 will retain its current use, which is BUSD administrative offices, a pre-school and the Bassett Child Development Center. Parcel APN 8558-015-900 is associated with the Project in connection with an easement ,to be recorded against it, ensuring continued access and parking to the Project site. The Project is located at the southern boundary of the City of Baldwin Park (City) and immediately adjacent to the unincorporated community of Bassett. The Project site has an existing land use designation and zoning designation of Open Space. The surrounding uses are described in the table below.
Table #1
Adjacent Land Use AND ZONING
Adjacent Property Location Zoning Property Use
North Open Space (OS),
Industrial (I)
Walnut Creek Flood Channel, Industrial Complex
East Multi-Family Residential
(R-3)
Condominiums, Mobile Homes
South Single Family Residential Single Family Residences (LA County) West Open Space (OS), Single
Family Residential
School for Early Child Development, Single-Family
Residences (LA County)
DISCUSSION:
The Applicant is requesting to develop the vacant portion of a school site with 104 two-story, townhouse apartments on land owned by BUSD. BUSD would remain the owner of the land and would lease it for a term of 99 years to the Applicant. In order to move forward with the Project, the Applicant must first obtain approval of a General Plan Amendment to change the land use designation from Open Space to Multi-Family Residential, a Zone change to change from Open Space (OS) to High-density Residential (R-3), an Administrative Adjustment to allow for a minor deviation from the building length standards, and a Design Review Application. In accordance with the Baldwin Park Municipal Code (BPMC) when multiple entitlements are requested as part of a project all of them will be considered concurrently by the highest applicable approval body, which in this case is the Planning Commission for recommendation and the City Council for final approval.
Project Summary Data
• Address: 1314 Le Borgne Avenue
• Zone Proposed: R-3
• Site Area: 5.22 Acres
• Units Proposed: 104 two-story townhome apartments
• Density: 19.9 DU/acre (20% max allowed)
• Unit Size: 39 units at 2 Bd/2.5Ba 1,060 SF
36 units at 3 Bd/2.5Ba 1,260 SF
19 units at 3 Bd/2.5Ba 1,270 SF
10 units at 2 Bd/2Ba 1,300 SF
• Lot Coverage: 40.6% (60% max allowed)
• Parking: 243 (243 required. 2 spaces per unit and 0.33 guest spaces per unit) • Common Open Space: 27,693 SF (26,000 SF required. 250 SF per unit) • Private Open Space: 10,570 SF (10,400 SF required. 100 SF per unit) Zoning
The Project site is proposed to be developed with 104 apartment units within a 5.22-acre area. Since R-3 High Density Residential zoning is proposed, the Project was designed to meet the standards for that zoning designation.
At 104 units, the density for the project is 19.9 units per acre, which is below the maximum of 20 unit per acre. In the R-3 zone building height is permitted to be 35’-0” and three stories tall, which makes the proposed height of 26’-2” and two stories well below the maximum permitted. The Project covers the lot with approximately 40.6% with building footprint, whereas a maximum of 60% is permitted by the R-3 zone. Parking has been provided at the rate of two garage parking spaces per unit, plus 35 guest parking spaces, which equals the minimum parking requirement. Furthermore, the parking spaces on LeBorgne Avenue that are on BUSD property will be available for use by guests of the development. The Project is required to provide 250 square feet of common open space and 100 square feet of private open per unit. The project meets the requirement of common open space by providing a total of 27,693 square feet of area and now meets the requirement for private open space by providing 10,570 square feet, where 10,400 square feet are required. The proposed units are clustered into buildings with two, four, five and six units. All these types of buildings meet the requirement in the BPMC for maximum building length except for the buildings with six units, which are slightly over the maximum permitted (127’-10” proposed, whereas 125’ is permitted). Further discussion of this matter can be found in the Administrative Adjustment section of this report. The Project follows all other development standards of the BPMC. Lastly, this project will require a Lot Line Adjustment to shift the shared property line between the Project and the BUSD campus, and that has been added as a condition of approval that must be completed prior to permit issuance.
Architectural and Site Design
The 104 units proposed for the project will be dispersed throughout the Project site within 20, two-story buildings.
The buildings will have two to six units per building with four and five-unit buildings sited next to the adjacent residential properties to the south and east (See Exhibit 4). The architecture of the development is in the Spanish Colonial Revival style, complete with tile roofs, earth-toned stucco walls, brown doors and windows, decorative gable vents, and brown corbels beneath building projections. The recreational building will have additional Spanish-style adornments of a decorative wrought iron window grill and decorative Spanish wall tile. In addition to the residential units, the site will be developed with amenities including a recreation building, pool, dog park, and pocket park. The pocket park that is proposed to be 11,080 square feet in size and developed with enhanced paving, picnic area, and lawn, will be available for the residents of the development and the community as a whole. Circulation within the development will be facilitated by a central 26’-0”-wide driveway designed to accommodate two-way traffic as well as 24’-0”-wide driveways that tier off the central drive aisle As part of this request, the Applicant/BUSD has offered to provide an irrevocable ingress, egress, and parking easement for this property and this offer has been added as a condition of approval. The proposed multi-family residential project is
subject to the City’s development standards including the objective design standards and has been designed to meet those standards. With incorporation of the conditions of approval and with approval of the proposed entitlements the project would be in compliance with the City’s development standards for the proposed R-3 zoning.
Traffic, and Circulation
Circulation within the Project site will be via a central drive aisle with driveways that tier off the main drive aisle.
Vehicle access to the units will either be off the main drive aisle or via one of the driveways. Vehicle access to the development from the street will be secured with a pair of new vehicle gates within the Project site (see Exhibit 4, page A.0.1). The pocket park and the recreational building components of the Project will be located in front of the gates. Visitor access for persons with disabilities will be accommodated through the provision of a handicap parking space in front of the recreation building. Pedestrian access within the site is facilitated by the landscape-lined walkways and paseos distributed throughout the development. Walkways connect each unit with the dog park, pocket park, and recreation building, as well as to Le Borgne Avenue and into the neighborhood beyond.
Access from the Project to public streets will be through Le Borgne Avenue, which connects to Millbury Avenue to the southeast and Barrydale Street to the southwest. The segment of Le Borgne Avenue between the project site and Millbury Avenue (APN 8558-015-900) and the segment of Le Borgne Avenue between the project and Barrydale Street (8558-023-905) are private portions of the street that are on parcels owned by BUSD. To ensure that access is maintained indefinitely to the project, a condition of approval has been included for the Applicant to obtain an irrevocable parking and access easement from the BUSD for both parcels. The existing vehicle gates at the entrances to BUSD property entrances at the intersection of Le Borgne Avenue and Millbury Avenue as well as the intersection of Le Borgne Avenue and Barrydale Street will be removed to ensure open access from the Project to the public right-of-way.
The original project design provided a single point of access to the Project site off of Millbury Street. Several comments were received from members of the Bassett community proximate to the project site during the Applicant’s public outreach events and at City public meetings which suggested that the existing traffic conditions in the area are poor—particularly on Millbury Street—due to the narrow street width. The common sentiment among the comments received was that the Project could exacerbate the already poor conditions. In response to comments received, the Applicant revised the project design to increase the number of access points to the Project from one to two, with the intent to disperse traffic to and from the Project site. A traffic study that analyzed Vehicle Miles Traveled and the Traffic Impact Analysis was prepared by Fehr and Peers as part of the IS-MND to evaluate the existing traffic conditions and the Project’s anticipated traffic impacts (IS-MND Exhibits J and K).
The traffic study determined that the existing traffic flow was at an acceptable level and that the flow would not significantly change with the additional vehicle trips introduced by the Project. In regard to the VMT screening tool used, the Project’s VMT would be more than 30% below the VMT baseline for the Project’s baseline area and therefore mitigation measures are not required (IS-MND Exhibit J). In regard to the Traffic Impact Analysis, it was determined that with the Project, all study intersections are projected to operate at acceptable levels of service during both AM and PM peak hours. “A queuing analysis was conducted for all study intersections, and no movements were projected to experience queuing that would result in operational deficiencies” (IS-MND Exhibit K).
Los Angeles County Department of Public Works (County DPW) was a partner in the process in evaluating the traffic study and recommending edits to the report. Over the course of several meetings and many months of collaboration, the City and the County DPW determined that the traffic study and its proposed mitigation measures were acceptable (Exhibit 2). Furthermore, the City Engineer (with the support of County DPW) determined that the installation of a new traffic signal would be beneficial due to current conditions and the Applicant was agreeable to adding it as a condition of approval for this Project, so a condition of approval has been added for the Applicant to install at their cost a traffic signal at the intersection of Barrydale Street and Puente Avenue to ease
current and anticipated traffic pressures in the Project vicinity.
Reviewed for Safety
The Project has been reviewed for compliance with safety standards by the City’s Planning Division, Building and Safety Division, Public Works Department as well as the Los Angeles County Fire (LAFCD) and Public Works (County DPW) Departments and all these entities determine that it would not have a significant impact on the community and environment, provided the conditions of approval are adopted. LACFD reviewed the plans and approved the plans for appropriate access, provided conditions of approval, and required that the construction drawings be sent to LACFD for approval prior to issuance of a building permit (Exhibit 2).
Conditions of approval have been included with this proposal that require the Applicant to also submit plans for plan check review to the City of Baldwin Park City Engineer and the LACFD to confirm that the Project would provide adequate on-site access to emergency services and must incorporate all applicable design and safety standards and regulations outlined in Chapter 33 of the 2022 California Building Code, and Chapter 11 (Construction Requirements for Existing Buildings) of the California Fire Code.
The project construction will also occur above grade and there is no expectation that any below grade trunk lines would be impacted by the Project. If any utility lines need to be altered in any way, such activity would be subject to review and approval with the City’s Department of Public Works.
Events Occurring Post Planning Commission Decision
Ordinance No. 1527 was approved on July 15 and went into effect on August 14. This Ordinance, among other things, revised the requirement for private open space in the High-Density Residential (R-3) zone from 200 square-feet per unit to 100 square feet per unit. The Project did not comply with the private open space requirement even when the new standards within Ordinance No. 1527 were applied; however, the project was close to complying.
On September 14, the Applicant submitted revised plans (Exhibit 4) for the Project that enlarged the private open space area for 10 units from 60 to 117 square feet. Now each unit will now meet the requirement of 100 square feet of private open space per unit and the total private open space to be provided for the development will be 10,570 square feet, which exceeds the minimum requirement of 10,400 square feet. As a result of the revisions to the plans, the Variance request for a reduced amount of open space is no longer applicable, which is why it is not included as one of the entitlement requests.
The public comments made during and after the Planning Commission hearing on July 22, are included as Exhibit
5. GENERAL PLAN AMENDMENT AND ZONE CHANGE
The Project would require a change in the Land Use Designation within the General Plan from Open Space to Multi-Family Residential and to change the zoning designation from Open Space (OS) to High-Density Residential (R-3). The following findings must be made to approve the General Plan Amendment and Zone Change requests. If Council cannot make all the findings, then Council has the discretion to deny the Project. The following findings must be made to and the specific facts supporting the findings can be found in the resolutions and ordinance accompanying the staff report (Exhibits 1-4) A. The amendment is consistent with the goals, policies and objectives of the General Plan.
B. The amendment will not adversely affect surrounding properties.
C. The amendment promotes public health, safety and general welfare.
D. The amendment serves the goals and purposes of the zoning code.
ADMINISTRATIVE ADJUSTMENT: MAXIMUM BUILDING LENGTH
The proposed 104 residential units will be situated within buildings that have between two and six units. The longest buildings that have six units will have a building length that is 127’-10”, which is slightly longer than the maximum permitted building length of 125’-0” that is allowed by the BPMC. For deviations from development standards that are less than 10% of the required amount, the BPMC allows for an Administrative Adjustment to be approved by the City Planner provided the findings are met. The findings for an Administrative Adjustment that apply to this Project require that the requested adjustment will not interfere with the purpose and intent of the zone, the conditional approval of the request will not be injurious to adjacent property, the conditional approval of the request will not adversely affect the General Plan, and the development resulting from the request results in superior design.
The purpose of the building length regulation is to prevent developments from becoming monolithic and massive in appearance. Without proper architectural treatment, longer residential buildings can appear imposing and massive. The Applicant’s design addresses that matter by incorporating architectural elements like gables that provide relief in the roof line and with breaks in the wall plane to create variation and visual interest. For the nine (9) buildings within the subject development that exceed the maximum length, three gables are incorporated into the front of the building and two are incorporated into the back. For those same buildings, there are nine breaks in the wall plane on the front and three in the back, all of which contribute towards a superior design, which is better for the residents of the development and the community. It should be noted that none of the buildings that exceed the maximum length are sited immediately adjacent to the neighboring residential properties. While Administrative Adjustments are typically decided at the City Planner level, this application will be decided by the City Council due to a BPMC requirement which states that when a project with multiple entitlements is considered, all applications will be decided by the highest approval body.
Public Outreach and Responsive Project Scope Changes Made Prior to the Planning Commission Meeting The Applicant has participated in an open and public engagement process over the past 13 months. During that time, the Applicant held two public engagement sessions to explain the project to the community and received public input. The Applicant performed more engagement via door-to-door canvassing (see Exhibit 2).
Additionally, community members provided public input in the form of correspondence to Staff as well as via public comment at City Council and Planning Commission meetings (See Exhibit 2). For response to comments, see Exhibit 2). The topics of the comments received ranged widely, but repeated comments focused on the desire for a park, concerns about traffic, concerns about emergency services access, and preservation of privacy. In response to comments received from the Planning Staff and the community, the Applicant made several revisions to the plans. The first change was to reduce the number of units from 105 to 104 to satisfy the maximum density requirement. Second, part of the Project site at the entry of the development was set aside as a parklet that would be for use by the development residents and the community. While open to the public, this parklet will be on private property and funded and maintained by the Applicant for the life of the lease. Third, the scale of the development was reduced by changing the apartments from three-story units to two-story units. The Applicant stated that the intent of this change was to make the development more compatible with the neighborhood and to better preserve privacy for the immediate neighbors. Fourth, the Applicant increased the points of access to the site from one to two. The Applicant’s stated intent for this change was to provide better access for emergency service access (though LACFD approved the project with one access point) and to disperse traffic. Fifth, the Applicant and BUSD together agreed to allow parking for the development on adjacent BUSD-owned property to prevent any
guest parking overflow demand from spilling into the adjacent public streets. A condition of approval has been included with this staff report to require that this parking arrangement is made permanent through an irrevocable parking and access easement to be recorded with the County Recorder. Lastly, the Applicant agreed to fund the installation of a traffic signal at Barrydale Street and Puente Avenue to alleviate existing and anticipated traffic demand for the neighborhood. This is also included as a condition of approval for the project.
Public Comments from the Planning Commission Meeting
An extensive amount of public comments were received at the Planning Commission meeting from individuals in opposition and in support of the Project. The full record is available for review on YouTube, but the repeated themes are summarized in the table below:
Oppose because a park is the desired development project.
Oppose because the Project does not provide affordable units.
Oppose because the Project will cause traffic congestion and parking impacts in the area immediately adjacent to the project. There is common sentiment that existing traffic and parking conditions are bad.
Oppose because of concern regarding contaminated soil, which stems from a letter received during the CEQA comment period from the California Department of Toxic Substance Control.
Oppose because a lease forecloses on the opportunity for future open space.
Oppose because an EIR was not prepared.
Support due to the increase of housing options in the City of Baldwin Park.
Support due to pocket park proposal.
Support for the increased funding for BUSD, which benefits BUSD students.
Dissatisfaction with BUSD’s decision-making process regarding the site prior to award of project to Applicant.
Planning Commission Discussion
The Planning Commission found that the Variance for reduction of private open space to about half of the requirement is too great. Also, they determined that the findings could not be made that special circumstances apply or that the granting of the Variance did not constitute the granting of a special privilege. The Planning Commission also found that the General Plan finding, “The amendment will not adversely affect surrounding properties”, could not be made. They explained that the project was too dense as proposed since it is 20 units per acre, which is the maximum allowed in the R-3 zone. They also shared concerns that the parking provided was not enough, which could impact street parking in the neighborhood.
Government Code Section 65914.7
The proposed Project is proposed as a market-rate development of two-story homes. Under Government Code Section 65914.7, BUSD has the option of bypassing local review and develop a project consistent with that section. This section allows a school district to construct housing on their properties provided that the units are offered to their employees, adjacent school district employees, local public agency employees, or the general public if the first three do not rent all the units (as further defined by Government Code Section 65914.7(a)(3)).
Further, the majority of the units are to be rented at an affordable rate, 30% of which is to be rented at a lower income rate. Further, under this option to the project could be constructed at the maximum height of 35’-0”, which is consistent with three-story developments. If BUSD utilized this section, no General Plan Amendment or Zone Change would be required, and the Administrative Adjustment would likely be named as a concession or waiver that is afforded for providing affordable housing as allowed by California’s Affordable Housing Density Bonus
law. The remaining Design Review entitlement is ministerial and would not be brought to a public hearing for consideration.
ALTERNATIVES:
None
CEQA REVIEW:
The initial study prepared for the Project disclosed that the Project would potentially have a significant impact on the environment if mitigation measures were not adopted. Mitigation measures have been incorporated into the project’s design, as conditions of approval, and as part of a Mitigation Monitoring and Reporting Program to reduce impacts on the environment to a less than significant level. A Mitigated Negative Declaration of Environmental Impact has been prepared pursuant to the requirements of the California Environmental Quality Act (CEQA) of 1970, as amended. The Notice of Intent to Adopt a Mitigated Negative Declaration (NOI) was sent to the State Clearinghouse and County Clerk County of Los Angeles in accordance with CEQA and began a public review period from May 4, 2026 to June 4, 2026. The IS-MND is provided herein as Attachment #9. The IS-MND reflects the City’s independent judgement and concluded that after mitigation, all of the Project’s impacts would be less than significant.
On May 4, 2026, legal notice was published in the Baldwin Park Press, posted at City Hall and the City of Baldwin Park website. Public Hearing Notices/Notice of Intent were also mailed to the property owners and occupants within a 300-foot radius of the subject property. During the public comment period it was discovered that the link to the environmental document did not function correctly. In light of this discovery, Staff determined that the public comment period should be extended to June 29, 2026, out of an abundance of consideration in favor of public engagement. Accordingly, a revised NOI/Public Hearing Notice was mailed to the owners and occupants within a 300-foot radius of the subject property and also sent to the State Clearinghouse and County Clerk. An additional public hearing notice was provided via mail, posting, and publication on July 9, 2026.
The IS-MND was prepared by Rincon Consultants and was peer-reviewed by EcoTierra Consulting, Inc. Both consultants are included on the City’s pre-vetted list of qualified and reputable environmental consultants. While these consultants were selected off the City’s list by the Applicant, they are the City’s consultants tasked with environmental document preparation and review
LEGAL REVIEW:
This report has been reviewed and approved by the City Attorney as to legal form and content.
ATTACHMENTS:
1. Resolution 2026-030, for Project Approval
2. Resolution 2026-031, for Amendment of the Land Use Designation
3. Ordinance 1531, for Amendment of the Zoning Map
4. Resolution 2026-032, for Denial of the Project
5. Planning Commission Staff Report and its Exhibits
6. Appeal Letter
7. Revised Architectural Plans
8. Public Comments Received After the Planning Commission Meeting
9. References to General Plan Goals, Policies, and Action items
RESOLUTION 2026-030
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BALDWIN PARK ADOPTING THE FINDINGS OF FACT
AND APPROVING THE DEVELOPMENT OF A 5.22-ACRE
PROPERTY FOR A MULTI-FAMILY RESIDENTIAL
PROJECT COMPRISED OF 20 TWO-STORY BUILDINGS
AND TOTALING 104 TOWNHOME APARTMENT UNITS.
THE PROJECT REQUIRES A GENERAL PLAN
AMENDMENT, ZONE CHANGE, DESIGN REVIEW, AND
ADMINISTRATIVE ADJUSTMENT, AS WELL AS THE
ADOPTION OF THE IS-MND PREPARED FOR THE
PROJECT IN COMPLIANCE WITH THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT (CEQA) (LOCATION:
1314 LEBORGNE AVENUE, APNS 8558-023-905, 8558-
023-910, AND 8558-015-900: APPLICANT: STORM
PROPERTIES; CASE NUMBERS: AGP 25-01, Z 25-01, PR
25-17, AND AA 25-02).
SECTION 1. The City Council of the City of Baldwin Park does hereby find, determine, and declare as follows:
(a) An application for a General Plan Amendment was submitted by the developer of certain real property, located at 1314 LeBorgne Avenue in the City of Baldwin Park (“Property”), described more particularly in the Application on file with the City Planner; and
(b) The General Plan Amendment application is for the change of the Land Use from Open Space to Multi-Family Residential; and (c) An application for a Zone Change was submitted by the developer of the Property, described more particularly in the Application on file with the City Planner; and
(d) The Zone Change application is for the change of the zoning of the property from Open Space to High-Density Residential; and (e) An application for a Zone Variance, which is no longer necessary, was submitted by the developer of the Property, described more particularly in the Application on file with the City Planner; and (f) The Zone Variance application is to allow for a reduced amount of private open space to be provided that is less than the minimum amount required; and
Resolution 2026-030
November 4, 2026
(g) An application for a Design Review was submitted by the developer of the Property, described more particularly in the Application on file with the City Planner; and
(h) The Design Review application is to confirm that the Project architecture and site design complies with City development standards; and (i) An application for an Administrative Adjustment was submitted by the developer of the Property, described more particularly in the Application on file with the City Planner; and
(j) The Administrative Adjustment application is to allow for a minor deviation of the building length standards; and
(k) Collectively the application submittals listed in (a) through (j) above are referred to as “Project Applications” and/or “Project.” (l) A duly noticed public hearing was held on July 22, 2026, for said Project Applications by the Planning Commission, and based upon evidence presented in the staff report and each member of the Commission being familiar with the property, the Planning Commission determined that the facts as required by the Baldwin Park Municipal Code for the granting of the General Plan Amendment, Zone Change, Variance, Administrative Adjustment, and Design review associated with the Project were not present and that the said Project Applications should not be granted; and (m) A resolution recommending denial of the Project was prepared at the direction of the Planning Commission and the Planning Commission adopted Resolution No. PC 26-07 at the August 12, 2026, Planning Commission meeting; and
(n) On August 19, 2026, the Applicant submitted a letter of appeal so that the Project can be heard by the City Council for a decision; and (o) The applications before the City Council for consideration are the General Plan Amendment, Zone Change, Design Review, and Administrative Adjustment which shall collectively be known as “Project Applications”; and
(p) A duly noticed public hearing was held on November 4, 2026, for said Project Applications by the City Council, and based upon evidence presented in the staff report and each member of the City Council being familiar with the property, it was determined that the facts as required by the Baldwin Park Municipal Code for the granting of the General Plan Amendment, Zone Change, Administrative Adjustment, and Design review
Resolution 2026-030
November 4, 2026
associated with the Project are present and that the said Project Applications should be granted subject to the terms of the Resolution.
SECTION 2. The City Council does hereby adopt the following Findings of Fact applicable to the Project Applications:
General Plan Amendment and Zone Change
(a) The amendment is consistent with the goals, policies and objectives of the General Plan. The General Plan calls for a mix of housing options to serve the varied needs of current and future residents (LU Goal 1, Environmental Justice Policy 3.03, Housing Policy H3.0, Housing Policy H3.1) and the proposal will introduce townhouse-style residential units as a rental product. Typically, townhomes are developed as condominiums for purchase, so the homes proposed with this development offer an option that is new and different to the community. General Plan Land Use Goal 2.0 calls for the accommodation of new development that is compatible with and compliments existing conforming land uses. The proposed development is for two-story multi-family housing which is consistent with the existing housing on the adjacent property to the northeast. The single-family residential properties in the neighborhood are developed with a mix of one and two-story homes. The proposed Project meets many General Plan goals, policies, and requirements by proposing a superior design.
Adequate onsite parking is provided (Circulation Goal 5), walls abut the perimeter to reduce noise for neighbors (Land Use Policy 2.5), drought tolerant plants and trees will be planted to conserve water (Parks and Open Space Policy 2.5, Environmental Justice Action HS-9.3, Land Use Policy
5.2), energy efficient building materials will be used to conserve energy (Housing Policy H1.7, Safety Policy 4.01, Parks and Open Space Policy
6.2), and new buildings will built to withstand earthquakes (Safety Policy
4.01). As supported by the traffic study prepared for the Project, the Project will not significantly impact traffic in the area, which is in compliance with Circulation Policy 1.4. Furthermore, the Project Applicant is willing to fund the construction of a new traffic signal nearby to address existing traffic demands (Circulation Policy 1.2). The Project proposes to utilize vacant land for a new productive use, which will have a positive impact on the community by generating new revenue in the form of City fees, development impact fees, and property taxes, which is encouraged by Economic Development Goal 1.0, Parks and Open Space 4.1, and Housing Policy H3.6. Another feature of the Project proposal that is supported by the General Plan is the creation of the pocket park located at the entrance to the development. This park will be constructed and maintained by the Applicant, but open to the general public. The creation of this park space is supported by Parks and Open Space Policy 1.3, Parks and Open Space Policy 2.3, Parks and Open Space Goal 4.0, Parks and Open Space Policy
Resolution 2026-030
November 4, 2026
4.1, and Environmental Justice Policy 14.02. The proposed Project will incorporate several design features to capture stormwater and percolate it onsite, which is supported by Environmental Justice Action HS-5.4 and Environmental Justice Action HS-5.9.
(b) The amendment will not adversely affect surrounding properties. The proposed use is residential, which is consistent with the surrounding uses. As such, it will not introduce noise, odors, or other more severe adverse impacts of more intense uses that are often restricted to Industrial-zoned properties. The topic of neighborhood impacts was more thoroughly examined in the Initial Study/Mitigated Negative Declaration (IS-MND) for the Project. The areas analyzed for impact included: aesthetics; agriculture and forestry resources; air quality, biological resources; cultural resources; energy; geology and soils; greenhouse gas emissions; hazards and hazardous materials; hydrology and water quality; mineral resources; noise; population and housing; public services; recreation; and transportation; Tribal Cultural Resources, Utilities and Service Systems; and Wildfire. The IS-MND identified that there could be construction-related impacts in the areas of Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Noise, and Tribal Cultural Resources, but all of the potential impacts identified were determined to be less than significant with the application of mitigation measures. ( Public comment was received that the site may not be safe for residential development without soil testing and remediation due to the possibility of soil contamination mentioned in the letter received from the California Department of Toxic Substance Control during the CEQA public comment period. However, evidence provided by the environmental consultant for the Project clarified that the use of the site as an orchard from 1928 to 1937 predated the widespread use of pesticides and organochlorine pesticides and the dry farming done from 1938 to 1958 that is not associated with pesticide use.
(c) The amendment promotes public health, safety and general welfare. The proposal is to create 104 new housing units in the City of Baldwin Park, which is roughly equal to the number of new units that are built within the City for a whole calendar year. The new housing would be sited on property that is currently vacant and has no productive use. The housing provided improves the general welfare of the City’s residents by providing new housing opportunities for families at a time when the State of California has declared a housing crisis. Every eight years the City is required to revise the Housing Element of the General Plan to remain in compliance with State law. To obtain approval of this Housing Element, it must, among other things, incorporate a plan to accommodate the number of housing units identified in the Regional Housing Needs Assessment (RHNA) that is generated by the Southern California Council of Governments (SCAG). For the current housing cycle that started in 2021,
Resolution 2026-030
November 4, 2026
it was determined by SCAG that the City must plan for the development of 2,001 units across the spectrum of affordability categories by 2029. To date, the City has constructed 448 units. While the Housing Element does not require the City to construct the number of units allocated by RHNA, the development of the Project helps the City to make gains towards the RHNA quota. While the Project is one of many in the City that will occur within this housing cycle, the number of units that would be approved would roughly equal the average number of units that are built within the City within a calendar year and therefore, would greatly assist the City in meeting its RHNA obligation. In addition to the new homes proposed, the Applicant will build a pocket park at the entrance to the development that will be open to the public but funded and maintained by the Applicant. This additional park space provides recreational opportunities that promote the health and general welfare of the community. Furthermore, the Project will provide long-term financial benefits for BUSD, which can be applied to educational programs, facilities, and services for students within the school district. (d) The amendment serves the goals and purposes of the zoning code. The purpose of the Zoning Code is to establish development standards that carry out the vision and goals of the General Plan. Per State law, the Zoning Code and the General Plan are required to be consistent.
The proposal for this Project is to change the land use of the property to residential and to change the zoning to be High-Density residential, so therefore, the land use and zoning for the property will be consistent. With the approval of the Variance and Administrative Adjustment, the proposed Project will be consistent with the proposed land use and zoning designation.
Administrative Adjustment: Maximum Building Length
The requested adjustment will not interfere with the purpose and intent of the zone, the conditional approval of the request will not be injurious to adjacent property, the conditional approval of the request will not adversely affect the General Plan, and the development resulting from the request results in superior design. The purpose of the building length
regulation is to prevent developments from becoming
monolithic and massive in appearance. Without proper
architectural treatment, longer residential buildings can appear imposing and massive. The Applicant’s design
addresses that matter by incorporating architectural elements like gables that provide relief in the roof line and with breaks in the wall plane to create variation and visual interest. For the buildings within the subject development that exceed the maximum length, three gables are incorporated into the front of the building and two are incorporated into the back. For those same buildings, there are nine breaks in the wall plane
Resolution 2026-030
November 4, 2026
on the front and three in the back, all of which contribute towards a superior design, which is better for the residents of the development and the community Further, none of the
buildings that exceed the maximum length are sited
immediately adjacent to the neighboring residential
properties.
Design Review
The proposed use, development or structure shall comply with all applicable provisions of the Design Guidelines are compatible with the design of adjacent land uses, and possess acceptable architectural design and aesthetic quality. The 104 units proposed for the Project will be dispersed throughout the Project site within 20, two-story buildings. The buildings will have two to six units per building with four and five-unit buildings sited next to the adjacent residential properties to the south and east . The architecture of the development is in the Spanish Colonial Revival style, complete with tile roofs, earth-toned stucco walls, brown doors and windows, decorative gable vents, and brown corbels beneath building projections. The recreational building will have additional Spanish-style adornments of a decorative wrought iron window grill and decorative Spanish wall tile. The two-story massing of the units within the development is consistent with the neighborhood, which is generally characterized by a mix of one- and two-story single-family homes and two-story multi-family units. Multiple breaks in the wall planes of the residences and lush landscaping at the Project perimeter will provide further relief of building massing for the nearby neighbors. In addition to the residential units, the site will be developed with amenities including a recreation building, pool, dog park, and pocket park. The Project is subject to the City’s objective design standards, and with the approval of the proposed Administrative Adjustment, the Project is in compliance with these standards.
CEQA
The City Council has reviewed the Initial Study/Mitigated Negative Declaration (IS-MND) as well as the associated Mitigation Monitoring and Reporting Plan (MMRP) for the Project, and in its independent judgment, finds and declares that all of the potential environmental impacts from the Project Applications and development and operation of the Project will be less than significant after the imposition of recommended mitigation measures, that the IS-MND complies with the California Environmental Quality Act (“CEQA”) in all respects, and approves the IS-MND along with the Project Applications. The City Council hereby adopts the IS-MND and MMRP for the Project.
Resolution 2026-030
November 4, 2026
SECTION 3. The Application, as herein above described below, and the same is hereby approved subject to the following conditions:
Planning
(a) That the property shall be developed and maintained in substantial accordance with the architectural plans (Exhibit 2) to the staff report for AGP 25-01, Z 25-01, PR 25-17, and AA 25-02, dated July 22, 2026; and
(b) That the proposed development shall with the development standards of “High Density Multi-Family Residential” (R-3) Zone, and all applicable provisions of the Baldwin Park Municipal Code; and (c) Applicant shall be responsible for all CEQA filing fees; and (d) An irrevocable parking and access easement between
parcels APN# 8558-015-900 (County) and APN# 8558-023-910, 905 (Baldwin Park) is required and shall be reviewed and approved by the City and recorded with the Los Angeles County Recorder prior to the issuance of any certificates of occupancy for the Project; and
(e) Signs shall be installed on parcel APN#8558-015-900 to reserve parking spaces for the sole use by guests of the Project. The wording, appearance, and placement of the signs shall be to the satisfaction of the City Engineer, and the signs shall be installed prior to the issuance of any certificates of occupancy for the Project; and
(f) Project residents shall be prohibited from parking spaces within the development that are reserved for guest parking; and (g) Garages shall be regularly inspected by the property manager to ensure that garage parking spaces are kept clear for vehicle parking; and (h) A park at the entrance of the development shall be
constructed and maintained at the expense of the Applicant for the duration of the land lease and any extension of thereof. The park shall be developed in the manner shown on the approved set of plans and shall not be altered without the written consent of the City of Baldwin Park Community Development Director. The park shall remain open to the public every day of the year during the hours specified in BPMC Sec.96.02 (K). A covenant shall be recorded against the property to ensure these requirements run with the land and this covenant shall be recorded prior to the issuance of a certificate of occupancy for any of the Projects’ residential units. (i) Decorative paving shall be used in compliance with Baldwin
Resolution 2026-030
November 4, 2026
Park Municipal Code Section 153.135.050 (B) and details showing compliance shall be included in the construction documents to be submitted for Building Plan Check; and
(j) All proposed landscaping shall comply with the City’s drought tolerant water standards found in Baldwin Park Municipal Code Section 153.160; and
(k) The window trim width for all proposed buildings shall comply with the City’s objective design standards and details showing compliance shall be included in the construction documents to be submitted for Building Plan Check; and
(l) A permit shall be obtained from the Tree Officer prior to the removal of any mature trees, as defined by the Baldwin Park Municipal Code, prior to the issuance of a building permit; and
(m) A trash management plan that has received official approval from the waste hauler shall be submitted to and approved by the City Planner prior to the issuance of a building permit; and (n) The proposed drainage system inside the Project site, from property line to property line shall be privately maintained. The existing inlet in Project site shall be maintained privately all the way to the existing outlet/headwall in Walnut Creek; and
(o) That any proposed changes to the approved plan shall be considered by the Planning Division, Building Division, and Los Angeles County Fire, and shall require written authorization of the City Planner prior to implementation; and
(p) The applicant shall, as a condition of project approval, at its sole expense, defend, indemnify and hold harmless the City, its officials, officers, employees, and agents from any claim, action, proceeding, liability or judgment against the City, its officials, officers, employees, and/or agents, which action seeks to set aside, void, annul or otherwise challenge any approval or CEQA determination by the City Council, Planning Commission, or other City decision-making body or City staff concerning applicants project. The applicant shall pay the City’s defense costs, including attorney fees and all other litigation related expenses, and shall reimburse the City for any and all costs, which the City may be required to pay as a result of such defense. The applicant shall further pay any adverse financial award which may issue against the City including but not limited to any award of attorney fees to a party challenging such project approval. The City shall retain the right to select its counsel of choice in any action referred to herein. The City agrees to promptly notify the applicant of any such action
Resolution 2026-030
November 4, 2026
filed against the City and to fully cooperate in the defense of any such action; and
(q) That the application shall sign a notarized affidavit within ten (10) days after the date of this resolution stating that the applicant has read and accepts all of the conditions of approval.
(r) The Applicant shall comply with the Mitigation Monitoring and Reporting Program (MMRP) associated with the Initial Study-Mitigated Negative Declaration (IS-MND) for the Project.
Building
(s) Compliance with the State of California Accessibility regulations is required, including the regulations listed below. Show on the plans how these regulations will be addressed:
a. Accessible parking:
i. 5% of the total guest parking space shall be
sized, marked, and reserved for accessible
parking.
ii. Shall be located at each main entrance.
Where multiple major entrances occur,
accessible parking shall be equally
distributed among the entrances.
iii. Shall be 9 feet wide by 18 feet deep and be
provided with a loading and unloading
passenger access aisle of 8 feet wide for
Van space and 5 feet wide for regular
accessible spaces.
b. Comply with CBC § 1102A.3 requirements for
multistory, multifamily development.
Notes for Plan Check: The issuance of any building permit is subject to the plan check of a complete submittal, which may result in subsequent corrections:
(t) All Conditions of Approval as approved by the Planning Division shall appear as notes on the plans submitted for building plan check and permits.
(u) Building design shall comply with the Current Edition of the California Building Code (CBC) and the California
Residential Code for single family occupancy.
(v) Submit complete construction plans and calculations to the Building Division for formal plans review and building permit.
Resolution 2026-030
November 4, 2026
(w)Separate application(s), plan check(s), and permit(s) is/are required for:
a. Grading (see Engineering Division for
requirements).
b. Site retaining walls (see Engineering Division for
requirements).
c. Block walls exceeding 6 feet in height.
d. Fire sprinkler/Alarm systems (contact LA County
Fire Department Prevention Bureau for
requirements).
e. Each separate structure/building
f. Plumbing
g. Mechanical
h. Electrical
(x) Complete architectural plans prepared a by State licensed architect will be required. Submit design for review at formal plans review.
(y) Complete structural plans with calculations by State licensed engineer or architect will be required. Submit design for review at formal plans review.
(z) Compliance with the California T-24 Energy regulations will be required. Submit design for review at formal plans review.
(aa) Compliance with the California Green Building Standards Code will be required. Submit design for review at formal plans review.
(bb) Separate plumbing, mechanical and electrical plan
check will be required. Submit design for review at formal plans review.
(cc) A soil and geology report is required to address the potential for and the mitigation measures of any seismic induced landslide/liquefaction. Soils report shall address foundation design and site preparation requirements.
(dd) Los Angeles County Fire Prevention plan review and approval is required for the proposed occupancy. Contact (323) 890-4125 for plans submittal requirements.
(ee) Sanitation District Industrial Waste approval or waiver is required. Please contact (562) 699-7411, Ext 2900 for
Resolution 2026-030
November 4, 2026
additional information.
(ff) All new on-site utility service lines shall be placed underground. BPMC Section 153.140.050.
(gg) A complete code analysis is required. Address type of construction, occupancy, exiting, allowable areas,
allowable heights, etc. Provide a summary table on the
drawing.
Public Works
A. GENERAL
1. A Lot Line Adjustment (LLA) establishing the new property lines shall be recorded with LA County prior to the issuance of a grading permit. A recent title report obtained within 6 months of the submittal date shall be provided along with all other LLA requirements established by the City.
2. A pre-development traffic impact study with mitigation recommendations has been submitted to the City of Baldwin Park Public Works Engineering Division and to the Los Angeles County Department of Public Works for approval consideration. The study addresses on-site circulation, parking requirements and shall include a traffic signal warrant analysis for the intersection at Francisquito Ave and Van Wig Ave, and the intersection of Puente Ave and Barrydale St. The recommendations of the traffic study shall be followed by the Applicant.
3. The applicant has prepared and submitted a Vehicle Miles Traveled (VMT) assessment prepared by a qualified traffic professional for review and approval by the City. The VMT assessment evaluates the Project’s transportation impacts. The assessment determined that the Project screened out and would not have a significant impact on the environment, and no mitigation measures are required.
4. Approval by the Los Angeles County Fire Dept. for access and fire protection of the site has already been provided.
5. Review and approval of the site plan from the trash service provider Waste Management has already been provided.
6. The Applicant shall submit a complete LID Plan in conformance with the LA County DPW LID Manual dated February, 2014 which addresses all requirements for this Project. The grading plans shall include all required storm water quality control measures to retain and infiltrate the required amount of rain water based on the required calculations. The LID plan shall also include a maintenance covenant for the proper maintenance of the LID
Resolution 2026-030
November 4, 2026
improvements. Percolation tests must be completed and an infiltration rate must be provided for calculating the design infiltration rate.
7. A construction traffic management and haul route plan shall be submitted and approved by the City Engineer prior to the start of construction. The Applicant shall repair any damage to public infrastructure caused by construction activities.
8. The applicant shall replace and record any centerline ties and monuments that are removed as part of this construction with the Los Angeles County Public Works Survey Division.
9. The applicant shall comply with all Federal, State and local laws relative to the approved use including the requirements of Community Development, Building and Safety, Engineering, County of Los Angeles Fire, and County of Los Angeles Health Departments.
10. The applicant shall pay all applicable plan check, permit, inspection, development impact, and related fees required by the City and any applicable reviewing agency prior to issuance of permits, approval of final plans, or final occupancy, as applicable. No permits or approvals shall be issued until all required fees have been paid in full.
B. GRADING / DRAINAGE / HYDROLOGY
1. A licensed land surveyor shall prepare a detailed boundary and topographic survey of the subject property. The survey shall include, at a minimum, all existing on-site and adjacent off-site features within a minimum of 300 feet from the property boundaries, including but not limited to structures, walls, utilities, trees, drainage features, and spot elevations/contours at appropriate intervals.
The survey shall clearly delineate all property lines, right-of-way lines, easements, and boundary dimensions based on record and/or field survey.
The location of all improvements relative to the property lines shall be shown.
The topographic and boundary survey shall be submitted with the grading plans and shall serve as the basis for all design work. All grading plans shall be consistent with the approved survey.
2. Submit a site Demolition Plan showing disposition of existing improvements, existing utilities, and all easements.
Resolution 2026-030
November 4, 2026
3. A soil/geotechnical report prepared by a Geotechnical Engineer, licensed by the State of California, shall be submitted by the applicant for approval by the City. The soil/geotechnical report shall address any soil preparation, R value testing for asphalt pavement design, foundation design criteria and identify any other hazards pertaining to seismic activity or drainage issues.
This Project is located within a liquefaction zone as identified by the State of California which shall be addressed in the report and must include mitigation measures, if required.
4. Upon approval of the soil/geotechnical report, the applicant shall submit drainage and grading plans prepared by a Civil Engineer, licensed by the State of California, prepared in accordance with the City’s requirements, the California Building Code, and acceptable grading practices for the City’s review and approval. A list of requirements for grading plan check is available from the Public Works Department. All grading (cut, fill and over excavation) calculations shall be submitted to the City concurrently with the grading plan. The post-development runoff can’t exceed the pre-development runoff into the LA County Flood District facilities.
5. Minimum slope for landscaped areas shall be 1.5%, asphalt shall be 1% and concrete shall be 0.5%.
6. The grading plan shall show the location of any retaining walls and the elevations of the top of wall/footing/retaining and the finished grade on both sides of the retaining wall. Construction details for retaining walls and footings shall be shown on the grading plan. Calculations and details of retaining walls shall be submitted to the Building and Safety Division for review and approval.
7. An Erosion Control Plan shall be submitted concurrently with the grading plan clearly detailing erosion control measures. These measures shall be implemented during construction. The erosion control plan shall conform to national Pollutant Discharge Elimination System (NPDES) standards and incorporate the appropriate Best Management Practices (BMP’s) as specified in the Storm Water BMP Certification. For construction activity which disturbs one acre or more of soil, a Storm Water Pollution Prevention Plan (SWPPP) will be required at the time of submitting for a grading permit review.
8. All easements shall be clearly identified on the grading plan.
9. Submit a stockpile plan showing the proposed location for stockpile for grading export materials, and the route of transport.
10. A detailed drainage study shall be submitted. All drainage/runoff from the development shall be conveyed from the site to the natural drainage course.
Resolution 2026-030
November 4, 2026
No on-site drainage shall be conveyed to adjacent parcels unless that is the natural drainage course. The post-development runoff can’t exceed the pre-development runoff into the LA County Flood District facilities.
11. Prior to the issuance of a grading permit, a complete hydrology and hydraulic study shall be prepared by a Civil Engineer registered in the State of California to the satisfaction of the City Engineer and Los Angeles Public Works Department.
12. All slopes shall be seeded with native grasses or planted with ground cover, shrubs, and trees for erosion control upon completion of grading or some other alternative method of erosion control shall be completed to the satisfaction of the City Engineer.
13. Rough grade certification by Project soils and CA licensed civil engineers shall be submitted prior to issuance of building permits.
14. Final grade & pad certifications by Project soils and CA licensed civil engineers shall be submitted to the Public Works Department prior to the issuance of any Project final inspections/certificate of occupancy respectively.
15. The Applicant shall coordinate with the Los Angeles County Department of Public Works, Design Division, Hydraulic Analysis Unit, to determine the allowable discharge rate into the existing culvert located west of the Project site, which conveys flows to Walnut Creek.
16. The proposed stormwater detention pipe and drywell system shall be designed and sized to detain all runoff in excess of the allowable discharge rate as determined by the County of Los Angeles, including runoff generated by the applicable design storm in accordance with County Low Impact Development (LID) requirements. The system shall release flows at or below the approved discharge rate. Storm water discharge overflow onto Millbury Ave is not allowed.
Final plans will require LA County Public Works’ approval prior to the issuance of the grading permit.
17. A pre-construction meeting shall be held at the Project site with the grading contractor, applicant, and city grading inspector at least 48 hours prior to commencing grading operations.
18. The developer shall work with and submit water improvement plans to the San Gabriel Valley Water Company and LA County Fire Department for their approval. Enough fire flow must be available for the proposed improvements.
Resolution 2026-030
November 4, 2026
19. The applicant shall provide a cost estimate prepared by and stamped by a licensed Civil Engineer for all proposed grading improvements including any cut, fill, import or transportation. Permit will not be issued until the applicant provides all required grading bonds. Bond amount for on-site grading improvements shall be for 50% of the cost estimate. Cost estimates shall be submitted with the grading application and shall be approved by the City prior to obtaining the bonds.
C. OFF-SITE STREET IMPROVEMENTS
1. The applicant shall submit a street improvement plan stamped and signed by a licensed civil engineer for approval by the City Engineer of proposed public improvements.
2. All public improvements shall be approved by the City Engineer, constructed with an encroachment permit, and completed prior to final inspection/certificate of occupancy issuance for areas within the jurisdiction of the City of Baldwin Park. Improvements within the jurisdiction of Los Angeles County shall be approved by the Los Angeles County Department of Public Works.
3. Remove and replace damaged and/or uplifted concrete sidewalk/curb & gutter within subject property’s fronting site on Millbury Avenue.
4. The applicant shall replace all pavement markers and striping removed as part of the street paving operation within the Project frontage and affected limits to the satisfaction of City Engineer.
5. All existing and proposed manholes, utility vaults, and utility meters within paving limits shall be adjusted to grade and shown on street plan.
6. The applicant shall replace and record any centerline ties and monuments that are removed as part of this construction with the Los Angeles County Public Works Survey Division.
7. Prior to the issuance of any permits, the applicant shall provide written permission to the satisfaction of the City from any property owners which will be affected by offsite grading.
8. Obtain and address comments from Los Angeles County Department of Public Works for affected streets surrounding the Project.
9. Provide alternative or temporary access to the parking lot for the existing Bassett Flanner campus buildings.
Resolution 2026-030
November 4, 2026
10. The Applicant shall design and install a new complete traffic signal at the intersection of Puente Ave and Barrydale St to the satisfaction of the City Engineer. All signal work and off-site improvements shall be completed prior to issuance of the first certificate of occupancy.
11. The applicant shall provide a cost estimate prepared by and stamped by a licensed Civil Engineer for all proposed off-site improvement. Bond amount for off-site improvements shall be for 100% of the cost estimate. Cost estimates shall be submitted for City approval prior to obtaining the bonds.
D. UTILITIES
1. Applicant shall provide a utility plan for all wet and dry utilities servicing the proposed development. The utility plan shall be prepared by a Licensed Civil Engineer, in the State of California, and included as part of the improvement plans. The plan shall indicate all existing and proposed utilities and the location of all public and private utilities to the satisfaction of the City Engineer.
2. Easements, satisfactory to the City Engineer and the utility companies, for public utility and public services purpose shall be offered and shown on the detailed site plan for dedication to the City or affected utility company.
3. Will Serve Letters shall be submitted to the City stating that adequate facilities are or will be available to serve the proposed Project from all utilities such as, but not limited to, phone, trash, gas, water, electric, and communication companies including cable.
4. Applicant shall relocate and underground any existing on-site utilities to the satisfaction of the City Engineer and the respective utility owner.
5. The Applicant shall demonstrate adequate water supply and fire flow in coordination with the water purveyor San Gabriel Valley Water Company and Los Angeles County Fire Department. Required system upgrades shall be completed prior to occupancy.
E. SEWERS
1. Applicant to provide a sewer area study prepared by a Licensed Civil Engineer, in the State of California, demonstrating that the existing sewer mains have sufficient capacity to support the proposed improvements. If existing facilities are determined to be inadequate, the Applicant shall fund and construct all necessary improvements. The sewer study shall be submitted to LA County Sanitation District, including impacts to the existing 42-inch trunk sewer line owned by LACSD that runs through the Project site.
Resolution 2026-030
November 4, 2026
The developer’s plans indicate the existing10-foot easement. The developer shall comply with LACSD easement and build-over requirements, given the size and importance of the existing trunk line.
2. Applicant shall obtain connection permit(s) from the City and County Sanitation District prior to issuance of building permits and pay the associated connection fees. Sewer plans shall be submitted for review and approval by the City.
3. For new sewer laterals, the existing sewer lateral shall be replaced and/or removed if no longer used.
4. Show the sewer lateral size and locations for each unit and how they will connect to the sewer main. Show the size and location of the back-flow preventer if applicable.
5. The Project site is subject to an existing 10-foot easement granted to the County Sanitation District for sewer purposes. If allowed by the County Sanitation District, the applicant may encroach into the easement area with the building footprint; however, no portion of the structure shall be constructed directly over the sewer facilities in a manner that would impede or restrict access for maintenance and operations
LA County Fire Department
1. All fire hydrants shall measure 6”x4”x2-1/2” brass or bronze, conforming with current AWWA standard C503 or approved equal, and shall be installed in accordance with the County of Los Angeles Fire Code. Fire Code 501.4.
2. Fire hydrant improvement plans for the new required public fire hydrant shall be submitted to the Land Development Unit for review and approval prior to building permit approval.
3. Review and approval by the County of Los Angeles Fire Department, Fire Prevention Engineering Section Building Plan Check Unit may be required for this Project prior to building permit issuance.
SECTION 4. Pursuant to the foregoing recitations and findings, the City Council approves the appeal and overturns the Planning Commission decision recommending denial of the Project and APPROVES the Project Applications for a new apartment development and adopts the IS-MND and MMRP prepared for the Project.
SECTION 5. The City Clerk shall Certify to the passage of the adoption of this resolution and enter it into the book of original resolutions.
Resolution 2026-030
November 4, 2026
SECTION 6. This resolution shall become effective immediately upon its adoption.
SECTION 7. The City Clerk shall certify to the adoption of this resolution and hereafter the same shall be in full force and effect.
PASSED AND APPROVED this 4th day of November, 2026.
_____________________________________
DANIEL DAMIAN, MAYOR
BALDWIN PARK PLANNING CITY COUNCIL
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES ss.
CITY OF BALDWIN PARK
I, CHRISTOPHER SAENZ, City Clerk of the Baldwin Park City Council, do hereby certify that the foregoing Resolution No. 2026-030 was duly and regularly approved and adopted by the City Council at a regular meeting thereof, held on the 4th day of November, 2026 by the following to wit:
AYES:
NOES:
ABSTAIN:
ABSENT:
________________________________________
CHRISTOPHER SAENZ
BALDWIN PARK CITY CLERK
RESOLUTION 2026-031
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BALDWIN PARK AMENDING THE GENERAL PLAN FROM
OPEN SPACE TO MULTI-FAMILY RESIDENTIAL FOR THE
PROPERTY LOCATED AT 1314 LEBORGNE AVENUE,
APNS 8558-023-905, 8558-023-910, AND 8558-015-
900: APPLICANT: STORM PROPERTIES; CASE
NUMBER: AGP 25-01.
SECTION 1. The City Council of the City of Baldwin Park does hereby find, determine, and declare as follows:
(a) An application for a General Plan Amendment was submitted by the developer of certain real property, located at 1314 LeBorgne Avenue in the City of Baldwin Park, described more particularly in the Application on file with the City Planner for the development of a multifamily residential project comprised of 20 two-story buildings and totaling 104 townhome apartment units (“Project”); and
(b) The General Plan Amendment is to change of the Land Use from Open Space to Multi-Family Residential; and
(c) A duly noticed public hearing was held on July 22, 2026, before the Planning Commission, and based upon evidence presented in the staff report and each member of the Commission being familiar with the property, the Planning Commission determined that the facts as required by the Baldwin Park Municipal Code for the granting of the General Plan Amendment for the project were not present and that the recommended denial; and
(d) A resolution recommending denial of the project was prepared at the direction of the Planning Commission and the Planning Commission adopted Resolution No. PC 26-07 at the August 12, 2026, Planning Commission meeting; and
(e) On August 19, 2026, the Applicant submitted a letter of appeal to the City Council; and
(f) A duly noticed public hearing was held on November 4, 2026, by the City Council, and based upon evidence presented in the staff report and each member of the City Council being familiar with the property, it was determined that the facts as required by the Baldwin Park Municipal Code for the granting of the General Plan Amendment.
Resolution 2026-031
November 4, 2026
SECTION 2. The City Council does hereby adopt the following Findings of Fact applicable to the Project Applications:
General Plan Amendment Findings
(a) The amendment is consistent with the goals, policies and objectives of the General Plan. The General Plan calls for a mix of housing options to serve the varied needs of current and future residents (LU Goal 1, Environmental Justice Policy 3.03, Housing Policy H3.0, Housing Policy H3.1) and the Project will introduce townhouse-style residential units as a rental product. Typically, townhomes are developed as condominiums for purchase, so the homes proposed with this development offer an option that is new and different to the community. General Plan Land Use Goal 2.0 calls for the accommodation of new development that is compatible with and compliments existing conforming land uses. The proposed Project is for two-story multi-family housing which is consistent with the existing housing on the adjacent property to the northeast. The single-family residential properties in the neighborhood are developed with a mix of one and two-story homes. The proposed Project meets many General Plan goals, policies, and requirements by proposing a superior design. Adequate onsite parking is provided (Circulation Goal 5), walls abut the perimeter to reduce noise for neighbors (Land Use Policy 2.5), drought tolerant plants and trees will be planted to conserve water (Parks and Open Space Policy
2.5, Environmental Justice Action HS-9.3, Land Use Policy 5.2), energy efficient building materials will be used to conserve energy (Housing Policy H1.7, Safety Policy 4.01, Parks and Open Space Policy 6.2), and new buildings will built to withstand earthquakes (Safety Policy 4.01). As supported by the traffic study prepared for the Project, the Project will not significantly impact traffic in the area, which is in compliance with Circulation Policy 1.4. Furthermore, the Project Applicant is willing to fund the construction of a new traffic signal nearby to address existing traffic demands (Circulation Policy 1.2). The Project proposes to utilize vacant land for a new productive use, which will have a positive impact on the community by generating new revenue in the form of City fees, development impact fees, and property taxes, which is encouraged by Economic Development Goal 1.0, Parks and Open Space 4.1, and Housing Policy H3.6. Another feature of the Project proposal that is supported by the General Plan is the creation of the pocket park located at the entrance to the development. This park will be constructed and maintained by the Applicant, but open to the general public. The creation of this park space is supported by Parks and Open Space Policy 1.3, Parks and Open Space Policy 2.3, Parks and Open Space Goal 4.0, Parks and Open Space Policy
4.1, and Environmental Justice Policy 14.02. The proposed Project will incorporate several design features to capture stormwater and percolate it onsite, which is supported by Environmental Justice Action HS-5.4 and
Resolution 2026-031
November 4, 2026
Environmental Justice Action HS-5.9.
(b) The amendment will not adversely affect surrounding properties. The proposed use is residential, which is consistent with the surrounding uses. As such, it will not introduce noise, odors, or other more severe adverse impacts of more intense uses that are often restricted to Industrial-zoned properties. The topic of neighborhood impacts was more thoroughly examined in the Initial Study/Mitigated Negative Declaration (IS-MND) for the project. The areas analyzed for impact included: aesthetics; agriculture and forestry resources; air quality, biological resources; cultural resources; energy; geology and soils; greenhouse gas emissions; hazards and hazardous materials; hydrology and water quality; mineral resources; noise; population and housing; public services; recreation; and transportation; Tribal Cultural Resources, Utilities and Service Systems; and Wildfire. The IS-MND identified that there could be construction-related impacts in the areas of Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Noise, and Tribal Cultural Resources, but all of the potential impacts identified were determined to be less than significant with the application of mitigation measures Public comment was received that the site may not be safe for residential development without soil testing and remediation due to the possibility of soil contamination mentioned in the letter received from the California Department of Toxic Substance Control during the CEQA public comment period. However, evidence provided by environmental consultant for the project clarified that use of the site as an orchard from 1928 to 1937 predated the widespread use of pesticides and organochlorine pesticides and the dry farming done from 1938 to 1958 that is not associated with pesticide use. (c) The amendment promotes public health, safety and general welfare. The proposal is to create 104 new housing units in the City of Baldwin Park, which is roughly equal to the number of new units that are built within the City for a whole calendar year. The new housing would be sited on property that is currently vacant and has no productive use. The housing provided improves the general welfare of the City’s residents by providing new housing opportunities for families at a time when the State of California has declared a housing crisis. Every eight years the City is required to revise the Housing Element of the General Plan to remain in compliance with State law. To obtain approval of this Housing Element, it must, among other things, incorporate a plan to accommodate the number of housing units identified in the Regional Housing Needs Assessment (RHNA) that is generated by the Southern California Council of Governments (SCAG). For the current housing cycle that started in 2021, it was determined by SCAG that the City must plan for the development of 2,001 units across the spectrum of affordability categories by 2029. To date, the City has constructed 448 units. While the Housing Element does not require the City to construct the number of units allocated by RHNA, the
Resolution 2026-031
November 4, 2026
development of the Project helps the City to make gains towards the RHNA quota. While the Project is one of many in the City that will occur within this housing cycle, the number of units that would be approved would roughly equal the average number of units that are built within the City within a calendar year and therefore, would greatly assist the City in meeting its RHNA obligation. In addition to the new homes proposed, the Applicant will build a pocket park at the entrance to the development that will be open to the public but funded and maintained by the Applicant. This additional park space provides recreational opportunities that promote the health and general welfare of the community. Furthermore, the Project will provide long-term financial benefits for BUSD, which can be applied to educational programs, facilities, and services for students within the school district. (d) The amendment serves the goals and purposes of the zoning code. The purpose of the Zoning Code is to establish development standards that carry out the vision and goals of the General Plan. Per State law, the Zoning Code and the General Plan are required to be consistent.
The proposal for this project is to change the land use of the property to residential and to change the zoning to be High-Density residential, so therefore, the land use and zoning for the property will be consistent.
CEQA
The City Council has reviewed the Initial Study/Mitigated Negative Declaration (IS-MND) as well as the associated Mitigation Monitoring and Reporting Plan (MMRP) for the project, and in its independent judgment, finds and declares that all of the potential environmental impacts from the Project Applications and development and operation of the Project will be less than significant after the imposition of recommended mitigation measures, that the IS-MND complies with the California Environmental Quality Act (“CEQA”) in all respects, and approves the IS-MND along with the Project Applications. The IS-MND and MMRP was adopted concurrently with the approval of the Project.
SECTION 3. Based upon the above Findings, the Land Use for the Property located at 1314 LeBorgne Avenue, APNS 8558-023-905, 8558-023-910, and 8558-015-900 is hereby changed from Open Space to Multi-Family Residential.
SECTION 4. The City Clerk shall Certify to the passage of the adoption of this resolution and enter it into the book of original resolutions.
SECTION 5. This resolution shall become effective immediately upon its adoption.
SECTION 6. The City Clerk shall certify to the adoption of this resolution and hereafter the same shall be in full force and effect.
Resolution 2026-031
November 4, 2026
PASSED AND APPROVED this 4th day of November 2026.
_____________________________________
DANIEL DAMIAN, MAYOR
BALDWIN PARK PLANNING CITY COUNCIL
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES ss.
CITY OF BALDWIN PARK
I, CHRISTOPHER SAENZ, City Clerk of the Baldwin Park City Council, do hereby certify that the foregoing Resolution No. 2026-031 was duly and regularly approved and adopted by the City Council at a regular meeting thereof, held on the 4th day of November, 2026 by the following to wit:
AYES:
NOES:
ABSTAIN:
ABSENT:
________________________________________
CHRISTOPHER SAENZ
BALDWIN PARK CITY CLERK
ORDINANCE NO. 1531
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BALDWIN PARK,
CALIFORNIA AMENDING THE ZONING MAP OF THE BALDWIN PARK MUNICIPAL CODE, TITLE XV, LAND USAGE, FOR THE PROPERTY LOCATED AT 1314 LEBORGNE AVENUE, APNS 8558-023-905, 8558-023-910, AND 8558-015-900 FROM OPEN SPACE (OS) TO HIGH DENSITY RESIDENTIAL (R-3)
WHEREAS, an application for a Zoning Code Amendment was submitted by the developer of certain real property, located at 1314 LeBorgne Avenue in the City of Baldwin Park (“Property”), described more particularly in the Application on file with the City Planner for the development of a multifamily residential project comprised of 20 two-story buildings and totaling 104 townhome apartment units (“Project”); and WHEREAS, the Zoning Code Amendment is to change the zoning for the Property from Open Space (OS) to High Density Residential (R-3); and WHEREAS, a duly noticed public hearing was held on July 22, 2026, before the Planning Commission, and based upon evidence presented in the staff report and each member of the Commission being familiar with the Property, the Planning Commission determined that the facts as required by the Baldwin Park Municipal Code for the granting of the Zoning Code Amendment for the Project were not present and that the recommended denial; and
WHEREAS, a resolution recommending denial of the Project was prepared at the direction of the Planning Commission and the Planning Commission adopted Resolution No. PC 26-07 at the August 12, 2026, Planning Commission meeting; and WHEREAS, on August 19, 2026, the Applicant submitted a letter of appeal to the City Council; and
WHEREAS, a duly noticed public hearing was held on November 4, 2026, by the City Council, and based upon evidence presented in the staff report and each member of the City Council being familiar with the Property, it was determined that the facts as required by the Baldwin Park Municipal Code for the granting of the Zoning Code Amendment.
NOW, THEREFORE, the City Council of the City of Baldwin Park does hereby ordain as follows:
SECTION 1. The above recitals are true and correct and are incorporated herein as if set forth in full.
Page | 2
SECTION 2. The City Council does hereby adopt the following Findings of Fact applicable to the Project Applications:
Zoning Code Amendment Findings
(a) The amendment is consistent with the goals, policies and objectives of the General Plan. The General Plan calls for a mix of housing options to serve the varied needs of current and future residents (LU Goal 1, Environmental Justice Policy 3.03, Housing Policy H3.0, Housing Policy H3.1) and the proposal will introduce townhouse-style residential units as a rental product. Typically, townhomes are developed as condominiums for purchase, so the homes proposed with this development offer an option that is new and different to the community.
General Plan Land Use Goal 2.0 calls for the accommodation of new development that is compatible with and compliments existing conforming land uses. The proposed development is for two-story multi-family housing which is consistent with the existing housing on the adjacent property to the northeast. The single-family residential properties in the neighborhood are developed with a mix of one and two-story homes. The proposed Project meets many General Plan goals, policies, and requirements by proposing a superior design. Adequate onsite parking is provided (Circulation Goal 5), walls abut the perimeter to reduce noise for neighbors (Land Use Policy 2.5), drought tolerant plants and trees will be planted to conserve water (Parks and Open Space Policy 2.5, Environmental Justice Action HS-9.3, Land Use Policy 5.2), energy efficient building materials will be used to conserve energy (Housing Policy H1.7, Safety Policy 4.01, Parks and Open Space Policy 6.2), and new buildings will built to withstand earthquakes (Safety Policy 4.01). In connection with the Project a traffic study was prepared and determined that the Project will not significantly impact traffic in the area, which is in compliance with Circulation Policy 1.4. Furthermore, the Project Applicant is willing to fund the construction of a new traffic signal nearby to address existing traffic demands (Circulation Policy 1.2). The Project proposes to utilize vacant land for a new productive use, which will have a positive impact on the community by generating new revenue in the form of City fees, development impact fees, and property taxes, which is encouraged by Economic Development Goal 1.0, Parks and Open Space 4.1, and Housing Policy H3.6. Another feature of the Project proposal that is supported by the General Plan is the creation of the pocket park located at the entrance to the development. This park will be constructed and maintained by the Applicant, but open to the general public. The creation of this park space is supported by Parks and Open Space Policy 1.3, Parks and Open Space Policy 2.3, Parks and Open Space Goal 4.0, Parks and Open Space Policy
4.1, and Environmental Justice Policy 14.02. The proposed Project will incorporate several design features to capture stormwater and percolate it onsite, which is supported by Environmental Justice Action HS-5.4 and Environmental Justice Action HS-5.9.
(b) The amendment will not adversely affect surrounding properties. The proposed use is residential, which is consistent with the surrounding uses. As
Page | 3
such, it will not introduce noise, odors, or other more severe adverse impacts of more intense uses that are often restricted to Industrial-zoned properties. The topic of neighborhood impacts was more thoroughly examined in the Initial Study/Mitigated Negative Declaration (IS-MND) for the project. The areas analyzed for impact included: aesthetics; agriculture and forestry resources; air quality, biological resources; cultural resources; energy; geology and soils; greenhouse gas emissions; hazards and hazardous materials; hydrology and water quality; mineral resources; noise; population and housing; public services; recreation; and transportation; Tribal Cultural Resources, Utilities and Service Systems; and Wildfire. The IS-MND identified that there could be construction-related impacts in the areas of Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Noise, and Tribal Cultural Resources, but all of the potential impacts identified were determined to be less than significant with the application of mitigation measures. Public comment was received that the site may not be safe for residential development without soil testing and remediation due to the possibility of soil contamination mentioned in the letter received from the California Department of Toxic Substance Control during the CEQA public comment period. However, evidence provided by the environmental consultant for the project clarified that use of the site as an orchard from 1928 to 1937 predated the widespread use of pesticides and organochlorine pesticides and the dry farming done from 1938 to 1958 that is not associated with pesticide use. (c) The amendment promotes public health, safety and general welfare. The proposal is to create 104 new housing units in the City of Baldwin Park, which is roughly equal to the number of new units that are built within the City for a whole calendar year. The new housing would be sited on property that is currently vacant and has no productive use. The housing provided improves the general welfare of the City’s residents by providing new housing opportunities for families at a time when the State of California has declared a housing crisis. Every eight years the City is required to revise the Housing Element of the General Plan to remain in compliance with State law. To obtain approval of this Housing Element, it must, among other things, incorporate a plan to accommodate the number of housing units identified in the Regional Housing Needs Assessment (RHNA) that is generated by the Southern California Council of Governments (SCAG). For the current housing cycle that started in 2021, it was determined by SCAG that the City must plan for the development of 2,001 units across the spectrum of affordability categories by 2029. To date, the City has constructed 448 units.
While the Housing Element does not require the City to construct the number of units allocated by RHNA, the development of this Project helps the City to make gains towards the RHNA quota. While the Project is one of many in the City that will occur within this housing cycle, the number of units that would be approved would roughly equal the average number of units that are built within the City within a calendar year and therefore, would greatly assist the City in meeting its RHNA obligation. In addition to the new homes proposed, the Applicant will build a pocket park at the entrance to the development that will be open to the public but funded and maintained by the Applicant. This additional park space provides recreational
Page | 4
opportunities that promote the health and general welfare of the community.
Furthermore, the Project will provide long-term financial benefits for BUSD, which can be applied to educational programs, facilities, and services for students within the school district.
(d) The amendment serves the goals and purposes of the zoning code. The purpose of the Zoning Code is to establish development standards that carry out the vision and goals of the General Plan. Per State law, the Zoning Code and the General Plan are required to be consistent. The proposal for this project is to change the land use of the property to residential and to change the zoning to be High-Density residential, so therefore, the land use and zoning for the property will be consistent.
CEQA
The City Council has reviewed the Initial Study/Mitigated Negative Declaration (IS-MND) as well as the associated Mitigation Monitoring and Reporting Plan (MMRP) for the project, and in its independent judgment, finds and declares that all of the potential environmental impacts from the Project Applications and development and operation of the Project will be less than significant after the imposition of recommended mitigation measures, that the IS-MND complies with the California Environmental Quality Act (“CEQA”) in all respects, and approves the IS-MND along with the Project Applications.
SECTION 3. Based on the foregoing findings and determinations, Baldwin Park Municipal Code Title XV (“Land Usage”), Chapter 153 (“Zoning Code”), Zoning Map, the zone for the Property located at 1314 Leborgne Avenue, APNS 8558-023-905, 8558-023- 910, and 8558-015-900 is hereby changed from Open Space to High Density Residential.
SECTION 4. The City Council hereby finds that the adoption of the Ordinance is consistent with the General Plan as a matter of law under Government Code section 66314(c).
SECTION 5. If any section, subsection, subdivision, sentence, clause, phrase or portion of this Ordinance, is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have adopted this Ordinance and each section, subsection, subdivision, sentence, clause, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, or portions thereof be declared invalid or unconstitutional.
SECTION 6. To the extent the provisions of the Baldwin Park Municipal Code as amended by this Ordinance are substantially the same as the provisions of that Code as they read immediately prior to the adoption of this Ordinance, then those provisions shall be construed as continuations of the earlier provisions and not as new enactments.
Page | 5
SECTION 7. The City Clerk is directed to certify the adoption of this Ordinance and post or publish this Ordinance as required by law.
SECTION 8. This Ordinance takes effect 30 days after its adoption. .
PASSED AND APPROVED ON THE ______ DAY OF ___________, 2026 _________________________________
DANIEL DAMIAN, MAYOR
ATTEST:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss:
CITY OF BALDWIN PARK )
I, Christopher Saenz, City Clerk of the City of Baldwin Park, do hereby certify that the foregoing Ordinance No. 1531 was duly approved and adopted at a regular meeting of the City Council on _________________, 2026 by the following vote:
AYES: COUNCILMEMBER:
NOES: COUNCILMEMBER:
ABSENT: COUNCILMEMBER:
ABSTAIN: COUNCILMEMBER:
_________________________________________
Christopher Saenz
CITY CLERK
RESOLUTION 2026-032
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BALDWIN PARK DENYING THE APPEAL AND ADOPTING
THE FINDINGS OF FACT, DENYING THE PROJECT FOR
THE CONSTRUCTION OF 104 TOWNHOME APARTMENT
UNITS, A GENERAL PLAN AMENDMENT TO CHANGE
THE LAND USE DESIGNATION FROM OPEN SPACE TO
MULTI-FAMILY RESIDENTIAL, A ZONE CHANGE TO
CHANGE THE ZONING FROM OPEN SPACE (OS) TO
HIGH-DENSITY RESIDENTIAL (R-3), AN
ADMINISTRATIVE ADJUSTMENT TO ALLOW FOR A
MINOR DEVIATION FROM THE BUILDING LENGTH
STANDARDS, AND A DESIGN REVIEW APPLICATION
FOR THE PROPERTY LOCATED AT 1314 LEBORGNE
AVENUE, ASSESSOR PARCEL NOS. 8558-023-905, 8558-
023-910, AND 8558-015-900..
SECTION 1. The City Council of the City of Baldwin Park does hereby find, determine, and declare as follows:
(a) An application for a General Plan Amendment was submitted by the developer of certain real property, located at 1314 LeBorgne Avenue in the City of Baldwin Park (“Property”), described more particularly in the Application on file with the City Planner; and
(b) The General Plan Amendment application is for the change of the Land Use from Open Space to Multi-Family Residential; and (c) An application for a Zone Change was submitted by the developer of the Property, described more particularly in the Application on file with the City Planner; and
(d) The Zone Change application is for the change of the zoning of the property from Open Space to High-Density Residential; and (e) An application for a Design Review was submitted by the developer of the Property, described more particularly in the Application on file with the City Planner; and
(f) The Design Review application is to confirm that the project architecture and site design complies with City development standards; and
Resolution 2026-032
November 4, 2026
(g) An application for an Administrative Adjustment was submitted by the developer of Property, described more particularly in the Application on file with the City Planner; and
(h) The Administrative Adjustment application is to allow for a minor deviation of the building length standards; and
(i) Collectively the applications set forth in (a) through (h) above are referred to “Project Applications” or “Project.”
(j) A duly noticed public hearing was held on July 22, 2026, for said Project Applications by the Planning Commission, and based upon evidence presented in the staff report and each member of the Commission being familiar with the Property, the Planning Commission determined that the facts as required by the Baldwin Park Municipal Code for the granting of the General Plan Amendment, Zone Change, Variance, Administrative Adjustment, and Design review associated with the Project were not present and that the said Project Applications should not be granted; and (k) A resolution recommending denial of the Project was prepared at the direction of the Planning Commission and the Planning Commission adopted Resolution No. PC 26-07 at the August 12, 2026, Planning Commission meeting; and
(l) On August 19, 2026, the Applicant submitted a letter of appeal so that the Project can be heard by the City Council for a decision; and (m) The Project Applications before the City Council for consideration are the General Plan Amendment, Zone Change, Design Review, and Administrative Adjustment which shall collectively be known as “Project Applications”; and
(n) A duly noticed public hearing was held on November 4, 2026, for said Project Applications by the City Council, and based upon evidence presented in the staff report and each member of the City Council being familiar with the property, it was determined that the facts as required by the Baldwin Park Municipal Code for the granting of the General Plan Amendment, Zone Change, Administrative Adjustment, and Design review associated with the Project are not present and that the said Applications should be denied.
SECTION 2. The City Council does hereby adopt the following Findings of Fact applicable to the Project Applications:
Resolution 2026-032
November 4, 2026
General Plan Amendment and Zone Change
(a) The amendment is consistent with the goals, policies and objectives of the General Plan. The General Plan calls for a mix of housing options to serve the varied needs of current and future residents (LU Goal 1, Environmental Justice Policy 3.03, Housing Policy H3.0, Housing Policy H3.1) and the proposal will introduce townhouse-style residential units as a rental product. Typically, townhomes are developed as condominiums for purchase, so the homes proposed with this development offer an option that is new and different to the community. General Plan Land Use Goal 2.0 calls for the accommodation of new development that is compatible with and compliments existing conforming land uses. The proposed development is for two-story multi-family housing which is consistent with the existing housing on the adjacent property to the northeast. The single-family residential properties in the neighborhood are developed with a mix of one and two-story homes. The proposed project meets many General Plan goals, policies, and requirements by proposing a superior design.
Adequate onsite parking is provided (Circulation Goal 5), walls abut the perimeter to reduce noise for neighbors (Land Use Policy 2.5), drought tolerant plants and trees will be planted to conserve water (Parks and Open Space Policy 2.5, Environmental Justice Action HS-9.3, Land Use Policy
5.2), energy efficient building materials will be used to conserve energy (Housing Policy H1.7, Safety Policy 4.01, Parks and Open Space Policy
6.2), and new buildings will built to withstand earthquakes (Safety Policy
4.01). In regard to traffic, the Project prepared a traffic study that determined that the Project will not significantly impact traffic in the area, which is in compliance with Circulation Policy 1.4. The Project Applicant is willing to fund the construction of a new traffic signal nearby to address existing traffic demands (Circulation Policy 1.2). The Project proposes to utilize vacant land for a new productive use, which will have a positive impact on the community by generating new revenue in the form of City fees, development impact fees, and property taxes, which is encouraged by Economic Development Goal 1.0, Parks and Open Space 4.1, and Housing Policy H3.6. Another feature of the Project proposal that is supported by the General Plan is the creation of the pocket park located at the entrance to the development. This park will be constructed and maintained by the Applicant, but open to the general public. The creation of this park space is supported by Parks and Open Space Policy 1.3, Parks and Open Space Policy 2.3, Parks and Open Space Goal 4.0, Parks and Open Space Policy
4.1, and Environmental Justice Policy 14.02. The proposed Project will incorporate several design features to capture stormwater and percolate it onsite, which is supported by Environmental Justice Action HS-5.4 and Environmental Justice Action HS-5.9.
While the Project may support many of the General Plan Goals and Policies
Resolution 2026-032
November 4, 2026
as set forth above, approval of the Project would allow land that is currently open space to be developed primarily with housing. Doing so would foreclose on the future possibility of the land being developed as public open space, which is needed in the City. Health and Open Space Goal HS-09 calls for the protection of natural spaces and Health and Open Space Goal HS-13 calls for providing residents of all ages with a range of safe and accessible opportunities for recreation and physical activities. Health and Open Space Goal HS-14 calls for public open spaces to be convenient to improve the health and well-being of vulnerable populations. Development of the Project would not achieve those Goals.
Also, Land Use Goal 2.0 seeks to accommodate new developments that are compatible with and complements existing conforming land uses. While there is one adjacent property that is R-3 multi-family residential, the majority of the adjacent uses are single-family residential uses that are far less dense than the proposed development.
In sum, there are General Plan Goals, Policies, and Objectives that support and do not support the proposed development.
(b) The amendment will not adversely affect surrounding properties. The Planning Commission found that the project would have an adverse impact on the surrounding properties in the categories of noise, traffic, parking, and density and recommended denial of the project for these reasons. The Project would introduce the maximum amount of density allowed in the proposed High-Density Residential zone, which is inconsistent with the low density Single-Family Residential zoned properties that predominantly surround the project site. The addition of 104 new multi-family units into the predominately single-family area would have an impact on the surrounding neighborhood by creating more traffic, more noise and greater density that is not compatible with the surrounding neighborhood.
Further, public comment was received that the site may not be safe for residential development without soil testing and remediation due to the possibility of soil contamination mentioned in the letter received from the California Department of Toxic Substance Control during the CEQA public comment period. If substantiated, then there is the potential for adverse impacts to the future residents of the Project and adjacent neighbors since soil testing and remediation is not included as mitigation measure in the Mitigation Monitoring and Reporting Program prepared in conjunction with the Final IS-MND.
(c) The amendment promotes public health, safety and general welfare. The proposal is to create 104 new housing units in the City of Baldwin Park, which is roughly equal to the number of new units that are built within the City for a whole calendar year. The new housing would be sited on property that is currently vacant and has no active use. However,
Resolution 2026-032
November 4, 2026
this area is open space and serves a purpose in the area. By placing additional, high-density housing, in a predominately single-family residential neighborhood, would not promote the public health, safety or general welfare. Specifically, the proposed density is the maximum allowed under the proposed R-3 zoning, and would create more traffic into the neighborhood, which would impact the single-family residences. (d) The amendment serves the goals and purposes of the zoning code. As stated above, the change does not serve the goals and purposes of the zoning code.
Administrative Adjustment, Design Review and CEQA
In that the City Council has made findings recommending denial of the General Plan Amendment and Zoning Code change, the remainder of the Project Applications are recommended for denial. Under Public Resources Section 21080(b)(5) CEQA does not apply to projects that have been disapproved or denied.
SECTION 3. Pursuant to the foregoing recitations and findings, the City Council denies the appeal and concurs with the Planning Commission decision recommending denial of the project and DENIES the Project Applications for a new apartment development.
SECTION 4. The City Clerk shall Certify to the passage of the adoption of this resolution and enter it into the book of original resolutions.
SECTION 5. This resolution shall become effective immediately upon its adoption.
SECTION 6. The City Clerk shall certify to the adoption of this resolution and hereafter the same shall be in full force and effect.
PASSED AND APPROVED this 4th day of November, 2026.
Resolution 2026-032
November 4, 2026
_____________________________________
DANIEL DAMIAN, MAYOR
BALDWIN PARK PLANNING CITY COUNCIL
ATTEST:
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES ss.
CITY OF BALDWIN PARK
I, CHRISTOPHER SAENZ, City Clerk of the Baldwin Park City Council, do hereby certify that the foregoing Resolution No. 2026-032 was duly and regularly approved and adopted by the City Council at a regular meeting thereof, held on the 4th day of November, 2026 by the following to wit:
AYES:
NOES:
ABSTAIN:
ABSENT:
________________________________________
CHRISTOPHER SAENZ
BALDWIN PARK CITY CLERK
STAFF REPORT
ITEM NO. _________________
TO: Honorable Chair and Planning Commissioners
FROM: Nick Baldwin, City Planner
DATE: July 22, 2026
SUBJECT: A request for development of a 5.22-acre property for a multi-family residential project comprised of 20 two-story buildings and totaling 104 townhome apartment units. The project
requires a General Plan Amendment, Zone Change, Zone
Variance, Design Review, and Administrative Adjustment as well as the adoption of the IS-MND prepared for the project in compliance with the California Environmental Quality Act (CEQA) (Location: 1314 LeBorgne Avenue, APNs 8558-023-
905, 8558-023-910, and 8558-015-900: Applicant: Storm
Properties; Case Numbers: AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02).
SUMMARY
The applicant, Storm Properties(Applicant), is proposing to develop a 5.22-acre vacant property owned by Bassett Unified School District (BUSD) and adjacent to the former Florence Flanner elementary school buildings. The development would consist of 20 two-story buildings for a total of 104 units. To gain approval for this project, the applicant is requesting a General Plan Amendment, to change the land use designation from Open Space to Residential, a Zone change to change the zoning from Open Space (OS) to High-density Residential (R-3), a Zone Variance to allow a reduced amount of private open space, an Administrative Adjustment to allow for a minor deviation from the building length standards, and a Design Review application. This project is before the Planning Commission for consideration and for a recommendation to the City Council for a decision.
RECOMMENDATION
Staff recommends that the Planning Commission:
1. Conduct a public hearing.
2. Find that the Mitigated Negative Declaration and the Initial Study-Mitigated Negative Declaration (IS-MND) as well as the associated Mitigation Monitoring and Reporting Plan (MMRP) was prepared in accordance with the California Environmental Quality Act (Pub. Resources Code, §§ 21000 et seq.) ("CEQA") and the State CEQA Guidelines (Cal. Code Regs, tit. 14, §§ 15000 et seq.) and recommend to the City Council the adoption of the IS-MND and MMRP for this project.
3. Adopt Resolution PC 26-07 RECOMMENDING THAT THE CITY COUNCIL APPROVE THE PROJECT FOR THE CONSTRUCTION OF 104 TOWNHOME APARTMENT
UNITS, WHICH REQUIRES GENERAL PLAN AMENDMENT TO CHANGE THE
LAND USE DESIGNATION FROM OPEN SPACE TO RESIDENTIAL, A ZONE
CHANGE TO CHANGE THE ZONING FROM OPEN SPACE (OS) TO HIGH-DENSITY RESIDENTIAL (R-3), A ZONE VARIANCE TO ALLOW A REDUCED AMOUNT OF
PRIVATE OPEN SPACE, AN ADMINISTRATIVE ADJUSTMENT TO ALLOW FOR A
MINOR DEVIATION FROM THE BUILDING LENGTH STANDARDS, AND A
AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02
1314 Le Borgne Avenue
2 DESIGN REVIEW APPLICATION.
FISCAL IMPACT
The subject project would have a significant positive impact for the City in the form of fees collected.
Development Impact Fees for parkland in-lieu, flood control, Police Department, traffic congestion relief, public art, and General Plan/Technology would be provided in the estimated amount of $2.46 million. An additional estimated sum of $389,406 would be provided for building permit fees and approximately $457,997 would be collected for school fees. Property tax revenue to the City would increase, as the site currently generates no property tax revenue because it is a publicly owned school district parcel.
BACKGROUND
The Florence Flanner Elementary School operated at the project site from 1980 to 1989 (Dept. of Education website). Per the BUSD, the school was closed due to declining enrollment. During that time, the undeveloped portion of the campus that is the location of the proposed housing development was not developed and was not open to the public. Starting in 2022, the BUSD went through a lengthy public process to determine the best use for the site and in 2023, the project applicant, Storm Properties, entered into an agreement with the BUSD to entitle the project, construct the townhome apartments, and manage the property for the life of the lease agreement. After being selected as the developer, the Applicant in May 2025 performed additional public outreach until the project was formally submitted in May 2025 (see Exhibit 3 re BUSD outreach and project selection).
PROJECT LAND USE AND ZONING
The Bassett Villas Project (Project) is located at 1314 Le Borgne and involves parcels with Assessor Parcel Numbers (APNs) of 8558-023-905, 8558-023-910, and 8558-015-900. The entire lot area of parcel APN 8558- 023-910 will be used for the project as well as a portion of parcel APN 8558-023-905. The remaining portion of parcel APN 8558-023-905 will retain its current use, which is BUSD administrative offices, a pre-school and the Bassett Child Development Center. Parcel APN 8558-015-900 relates to the project because an easement will be recorded against it to ensure sustained access and parking will be available to the Project site. The Project is located at the southern boundary of the City of Baldwin Park (City) and immediately adjacent to the unincorporated community of Bassett. The Project site has an existing land use designation and zoning designation of Open Space. The surrounding uses are described in the table below.
TABLE #1
ADJACENT LAND USE AND ZONING
ADJACENT PROPERTY
LOCATION ZONING PROPERTY USE
North Open Space (OS),
Industrial (I)
Walnut Creek Flood Channel, Industrial
Complex
East Multi-Family
Residential (R-3) Condominiums, Mobile Homes
South Single Family
Residential Single Family Residences (LA County)
West
Open Space (OS),
Single Family
Residential
School for Early Child Development, Single-Family Residences (LA County)
AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02
1314 Le Borgne Avenue
3 DISCUSSION
The Applicant is requesting to develop the vacant portion of a school site with 104 two-story, townhouse apartments on land owned by BUSD. BUSD would remain the owner of the land and would lease it for a term of 99 years to the Applicant. To move forward with the Project, the Applicant must first obtain approval of a General Plan Amendment, to change the land use designation from Open Space to Residential, a Zone change to change the zoning from Open Space (OS) to High-density Residential (R-3), a Zone Variance to allow a reduced amount of private open space, an Administrative Adjustment to allow for a minor deviation from the building length standards, and a Design Review Application (hereafter referred to as “Project” for development with entitlements). Per the process outlined in the Baldwin Park Municipal Code (BPMC), when multiple entitlements are requested of a project, all will be considered concurrently by the highest applicable approval body, which in the case project is the Planning Commission for recommendation and the City Council for approval. The recommendation of approval or denial by the Planning Commission to the City Council is to be based on whether the entitlement requests meet the required findings of the BPMC.
Project Summary Data
• Address: 1314 Le Borgne Avenue
• Zone Proposed: R-3
• Site Area: 5.22 Acres
• Units Proposed: 104 two-story townhome apartments
• Density: 19.9 DU/acre (20% max allowed)
• Unit Size: 39 units at 2 Bd/2.5Ba 1,060 SF
36 units at 3 Bd/2.5Ba 1,260 SF
19 nits at 3 Bd/2.5Ba 1,270 SF
10 units at 2 Bd/2Ba 1,300 SF
• Lot Coverage: 40.6% (60% max allowed)
• Parking: 243 (243 required. 2 spaces per unit and 0.33 guest spaces per unit) • Common Open Space: 27,693 SF (26,000 SF required. 250 SF per unit) • Private Open Space: 10,000 SF (20,800 SF required. 200 SF per unit) Zoning
The Project site is proposed to be developed with 104 apartment units within a 5.22-acre area. Since R-3 High Density Residential zoning is proposed, the Project was designed to meet the standards for that zoning designation. At 104 units, the density for the project is 19.9 units per acre, which is below the maximum of 20 unit per acre. In the R-3 zone, building height is permitted to be 35’-0” and three stories tall, which makes the proposed height of 26’-2” and two stories well below the maximum permitted. The Project covers the lot with approximately 40.6% with building footprint, whereas a maximum of 60% is permitted by the R-3 zone. Parking has been provided at the rate of two garage parking spaces per unit, plus 35 guest parking spaces, which equals the minimum parking requirement. Furthermore, the parking spaces on LeBorgne Avenue that are on BUSD property will be available for use by guests of the development. The Project is required to provide 250 square feet of common open space and 200 square feet of private open per unit. While the project meets the requirement of common open space by providing a total of 27,693 square feet of area, it falls short of the private open space requirement, which is why the Applicant has requested a Variance. Further discussion on this matter can be found
AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02
1314 Le Borgne Avenue
4 in the Variance section of this report. The proposed units are clustered into buildings with two, four, five and six units. All these types of buildings meet the requirement in the BPMC for maximum building length except for the buildings with six units, which are slightly over the maximum permitted (127’-10” proposed, whereas 125’ is permitted). Further discussion of this matter can be found in the Administrative Adjustment section of this report.
The Project follows all other development standards of the BPMC. Lastly, this project will require a Lot Line Adjustment to shift the shared property line between the Project and the BUSD campus and that has been added as a condition of approval that must be completed prior to permit issuance.
Architectural and Site Design
The 104 units proposed for the project will be dispersed throughout the Project site within 20, two-story buildings.
The buildings will have two to six units per building with four and five-unit buildings sited next to the adjacent residential properties to the south and east (See Exhibit 2). The architecture of the development is in the Spanish Colonial Revival style, complete with tile roofs, earth-toned stucco walls, brown doors and windows, decorative gable vents, and brown corbels beneath building projections. The recreational building will have additional Spanish-style adornments of a decorative wrought iron window grill and decorative Spanish wall tile. In addition to the residential units, the site will be developed with amenities including a recreation building, pool, dog park, and pocket park. The pocket park that is proposed to be 11,080 square feet in size and developed with enhanced paving, picnic area, and lawn, will be available for the residents of the development and the community as a whole. Circulation within the development will be facilitated by a central 26’-0”-wide driveway designed to accommodate two-way traffic as well as 24’-0”-wide driveways that tier off the central drive aisle. Each unit will have two garage parking spaces and there will be a total of 35 guest parking spaces comprised of 31 onsite and another four on the adjacent BUSD-owned property to the south (APN #8558-015-900). As part of this request, the Applicant/BUSD has offered to provide an irrevocable ingress, egress, and parking easement for this property and this offer has been added as a condition of approval. The proposed multi-family residential project is subject to the City’s development standards including the objective design standards. With incorporation of the conditions of approval and with approval of the proposed Variance and Administrative Adjustment, the project is in compliance with the City’s development standards.
Traffic, and Circulation
Circulation within the Project site will be via a central drive aisle with driveways that tier off the main drive aisle.
Vehicle access to the units will either be off the main drive aisle or via one of the driveways. Vehicle access to the development from the street will be secured with a pair of new vehicle gates within the Project site (see Exhibit 2, page A.0.1). The pocket park and the recreational building components of the Project will be located in front of the gates. Visitor access for persons with disabilities will be accommodated through the provision of a handicap parking space in front of the recreation building. Pedestrian access within the site is facilitated by the landscape-lined walkways and paseos distributed throughout the development. Walkways connect each unit with the dog park, pocket park, and recreation building, as well as to Le Borgne Avenue and into the neighborhood beyond.
Access from the Project to public streets will be through Le Borgne Avenue, which connects to Millbury Avenue to the southeast and Barrydale Street to the southwest. The segment of Le Borgne Avenue between the project site and Millbury Avenue (APN 8558-015-900) and the segment of Le Borgne Avenue between the project and Barrydale Street (8558-023-905) are private portions of the street that are on parcels owned by BUSD. To ensure that access is maintained indefinitely to the project, a condition of approval has been included for the Applicant to obtain an irrevocable parking and access easement from the BUSD for both parcels. The existing vehicle gates
AGP 25-01, Z 25-01, ZV 25-02, PR 25-17, AA 25-02
1314 Le Borgne Avenue
5 at the entrances to BUSD property entrances at the intersection of Le Borgne Avenue and Millbury Avenue as well as the intersection of Le Borgne Avenue and Barrydale Street will be removed to ensure open access from the Project to the public right-of-way.
The original project design provided a single point of access to the Project site off of Millbury Street. Several comments were received from members of the Bassett community proximate to the project site during the Applicant’s public outreach events and at City public meetings which suggest that the existing traffic conditions in the area are poor—particularly on Millbury Street—due to the narrow street width. The common sentiment among the comments received was that the Project could exacerbate the already poor conditions. In response to comments received, the Applicant revised the project design to increase the number of access points to the Project from one to two, with the intent to disperse traffic to and from the Project site. A traffic study that analyzed Vehicle Miles Traveled and the Traffic Impact Analysis was prepared by Fehr and Peers as part of the IS-MND to evaluate the existing traffic conditions and the Project’s anticipated traffic impacts (IS-MND Exhibits J and K). The traffic study determined that the existing traffic flow was at an acceptable level and that the flow would not significantly change with the additional vehicle trips introduced by the Project. In regard to the VMT screening tool used, the Project’s VMT would be more than 30% below the VMT baseline for the Project’s baseline area and therefore mitigation measures are not required (IS-MND Exhibit J). In regard to the Traffic Impact Analysis, it was determined that with the Project, all study intersections are projected to operate at acceptable levels of service during both AM and PM peak hours. “A queuing analysis was conducted for all study intersections, and no movements were projected to experience queuing that would result in operational deficiencies” (IS-MND Exhibit K).
Los Angeles County Department of Public Works (County DPW) was a partner in the process in evaluating the traffic study and recommending edits to the report. Over the course of several meetings and many months of collaboration, the City, the County DPW determined that the traffic study and its proposed mitigation measures were acceptable (Exhibit 4). Furthermore, the City Engineer (with the support of County DPW) determined that the installation of a new traffic signal was warranted and should be included as a condition for this project, so a condition of approval has been added for the Applicant to install at their cost a traffic signal at the intersection of Barrydale Street and Puente Avenue to ease current and anticipated traffic pressures in the Project vicinity.
Reviewed for Safety
The Project has been reviewed for compliance with safety standards by the City’s Planning Division, Building and Safety Division, Public Works Department as well as the Los Angeles County Fire (LAFCD) and Public Works (County DPW) Departments and all these entities determine that it would not have a significant impact on the community and environment, provided the conditions of approval are adopted. LACFD reviewed the plans and approved the plans for appropriate access, provided conditions of approval, and required that the construction drawings be sent to LACFD for approval prior to issuance of a building permit (Exhibit 5).
Conditions of approval have been included with this proposal that require the Applicant to also submit plans for plan check review to the City of Baldwin Park City Engineer and the LACFD to confirm that the Project would provide adequate on-site access to emergency services and must incorporate all applicable design and safety standards and regulations outlined in Chapter 33 of the 2022 California Building Code, and Chapter 11 (Construction Requirements for Existing Buildings) of the California Fire Code.
The project construction will also occur above grade and there is no expectation that any below grade trunk lines would be impacted by the Project. If any utility lines need to be altered in any way, such activity would be subject to review and approval with the City’s Department of Public Works.