Section 8323 of the SHC requires the legislative body to post notices of street vacation along the line of the street at least two weeks before the public hearing. The notices shall be posted not more than 300 feet apart, but at least three (3) notices shall be posted.
• City staff posted (3) notices along Euclid Avenue and (3) notices along Third Street on October 9, 2024. Refer to Attachment E and Attachment F for copies of notices and pictures of postings along Euclid Avenue and Third Street, respectively.

Section 8324 of the SHC requires the legislative body to hear evidence from persons interested in the proposed street vacation.
• City staff published a Notice of Hearing in the Press -Enterprise on October 18, 2024. Refer to Attachment C for proof of publication.

Section 8341 of the SHC requires that the resolution to vacate the street include a recital for the reservation of existing easements such as existing utility easements and existing emergency access easements, if required by the public agency. • City staff has determined that existing public utility easements shall be reserved.

Refer to Attachment A for Resolution of the City Council of the City of Beaumont, California, Vacating a portion of Euclid Avenue between Third Street and 560 feet south of Third Street and a portion of Third Street between Euclid Avenue and 300 feet east of Euclid Avenue.

Section 8324 of the SHC allows the legislative body to adopt a resolution to vacate the proposed street, if the City Council finds, from all the evidence submitted, that the street described in the notice of hearing is unnecessary for present or prospective public use. • City staff recommends City Council adopt a Resolution of the City Council of the City of Beaumont, California, Vacating a portion of Euclid Avenue between Third Street and 560 feet south of Third Street and a portion of Third Street between Euclid Avenue and 300 feet east of Euclid Avenue.

Fiscal Impact:

The cost of preparing the staff report and posting the notices is estimated to be $1,200.

There is no fiscal impact associated with the recommended action.

Page 903 of 1100 ends

Recommended Action:

Waive the full reading and adopt by title only, "A Resolution of the City of Beaumont, Vacating a portion of Euclid Avenue between Third Street and 560 feet south of Third Street and a portion of Third Street between Euclid Avenue and 300 feet east of Euclid Avenue."
Attachments:

A. Euclid Avenue and Third Street Vacation Resolution
B. Legal Description and Plat for Euclid Avenue and Third Street C. Notice of Hearing — Proof of Publication
D. California Streets and Highway Code for Street Vacation E. Third Street Vacation Posting
F. Euclid Avenue Vacation Posting

Page 904 of 1100 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY OF BEAUMONT VACATING A

PORTION OF EUCLID AVENUE BETWEEN THIRD STREET AND
560 FEET SOUTH THIRD STREET AND A PORTION OF THIRD
STREET BETWEEN EUCLID AVENUE AND 300 FEET EAST
EUCLID AVENUE.

WHEREAS the City Council initiated a proceeding to vacate a portion of Euclid Avenue between E 3rd Street and 560 feet south E 3rd Street and a portion of E 3rd Street between Euclid Ave and 300 feet east Euclid Avenue on October 1, 2024, and at least fifteen days has elapsed since the initiation of such proceedings; and
WHEREAS, the City Clerk has set a hearing on this date by fixing the date, hour, and place of the hearing and causing the publishing and posting of the notices required by the California Streets and Highway Code (SHC) 8340 et. seq.;
WHEREAS, City wishes to vacate the street right-of-way only if the street vacation conforms to the provisions of the (SHC); and
WHEREAS notice of the hearing on the proposed street vacation was published for at least two successive weeks prior to the hearing in a daily, semiweekly, or weekly newspaper published and circulated in the City;
WHEREAS, at least two weeks before the day set for the hearing, the City posted three conspicuous notices of vacation along the line of Euclid Avenue and Third Street not more than 300 feet apart;
WHEREAS SHC Section 8340 requires that the legislative body determine if reservation of existing utility easements are required in the right of way that is to be vacated and in this case reservation of such existing utility easement is required; and WHEREAS, SHC Section 8320 requires the legislative body to schedule and hold a public hearing on the street is to be vacated and to hear evidence presented by anyone who has opposition to the street vacation; and

Page 905 of 1100 ends

WHEREAS, SHC Section 8324 allows the legislative body to determine based on the evidence whether the street is unnecessary for present or prospective public use and if such a finding is made the street may be vacated by adopting a resolution to vacate the street; and WHEREAS Staff recommend the street vacation of Euclid Avenue and Third Street to proceed if the City Council makes the required findings.

NOW, THEREFORE, BE IT RESOLVED, that the City of Beaumont does authorize the vacation of Euclid Avenue and Third Street per the following provisions:

Provision 1. All existing public utility easements are hereby reserved within the area of Euclid Avenue and Third Street being vacated.

Provision 2. This resolution along with the legal description and plat for the vacation of Euclid Avenue and Third Street, in the form attached hereto as Exhibit "A" and made a part hereof by this reference, shall be recorded with the Riverside County Clerk Recorder's Office by the City Clerk.

MOVED, PASSED AND ADOPTED this 5th day of November 2024.

AYES:

NOES:

ABSTAIN:

ABSENT:

By:

David Fenn, Mayor, City of Beaumont
ATTEST:

Elaine Morgan

CITY CLERK
By:

Page 906 of 1100 ends

EXHIBIT "A'
(attach legal description and plat)

Page 907 of 1100 ends

Recording Requested By:

City of Beaumont
When Recorded Mail To:

City of Beaumont Planning Dept.
550 E. Sixth Street
Beaumont, CA 92223
NOTICE OF STREET VACATION NO. 2023-SV-002

RECORDED OWNER(S)
Pierce Hardy Limited Partnership,

AFFECTED ASSESSOR PARCEL NUMBER(S)
418-210-019

LEGAL DESCRIPTION OF ADJUSTED PARCEL
SEE EXHIBIT "A" AND EXHIBIT "B" ATTACHED HERETO AND BY THIS REFERENCE MADE A PART HEREOF.

SIGNATURE OF RECORD OWNER(S) (MUST BE NOTARIZED)

DEPARTMENT USE OLNY
Print Name
Signature
Title : (4 y if appli.. ble) Awl
Date: II1ItG
Illl
L . L
MAIL TAX STATEMENTS TO:

Pierce Hardy Limited Partnership
1019 Route 519
Eighty Four, PA 15330
VicZ, Restdc t -
This Notice of Street Vacation No. 2023-SV-002 is approved By: Jay S. Fahrion, P.L.S. No. 8207
Title: City Surveyor, City of Beaumont
Signed:
4/a

SURVEY DEPARTMENT APPROVAL
Date:

Page 908 of 1100 ends

ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of
On 'l . ate before me, �i rte, 1,.7/ ; r
(l re insert name and title of the%officer)
personally appeared
i r► -_/ --- - - - �_
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is subscribed to the within instrument and acknowledged _to me that executed the same in (his/ er/#h-etr authorized capacity(ies), and that by hi er eir signature(- on the instrument the person(s)-, or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature
MARY J. BURNS
Notary Public - California
=1 Riverside County
° Commission # 2378529
�:t o•"'� My Comm. Expires Nov 11, 2025
(Seal)

ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.

State of Cali#srnia i?
County of ,\J Qbin\,n
on =JU.‘At 15, x©0_ 3 before me, 1014 QtrQ �� _ ;4�� 6 lE�r-r (i
nsert name and itle of the officer)
personally appeared—kh(Lvt L—• eyor\P• V ?.
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature`
(Seal)
Commonwealth of Pennsylvania - Notary Seal
Tamara R. DeMarino, Notary Public
Washington County
My commission expires November 3, 2026
Commission number 1225445
Member, Pennsylvania Association of Notaries

Page 910 of 1100 ends

EXHIBIT "A" - LEGAL DESCRIPTION
STREET RIGHT-OF-WAY VACATION No. 2023-SV-002

PARCEL 'A'

IN THE CITY OF BEAUMONT, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, THAT

PORTION OF THE SOUTH HALF OF THIRD STREET, AND ALL THAT CERTAIN PORTION OF BLOCK 144 OF THE AMENDED MAP FOR THE TOWN OF BEAUMONT AS SHOWN BY MAP ON FILE IN BOOK 6, PAGES 16 AND 17 OF MAPS, RECORDS OF SAN BERNARDINO COUNTY, LYING WITHIN SECTION 10, TOWNSHIP 3 SOUTH, RANGE 1 WEST OF THE SAN BERNARDINO MERIDIAN, MORE PARTICULARLY DESCRIBED AS FOLLOWS;

COMMENCING AT THE CENTERLINE INTERSECTION OF THIRD STREET AND EUCLID AVENUE AS SHOWN BY RECORD OF SURVEY FILED IN BOOK 158, PAGE 89 OF RECORDS OF SURVEY;
THENCE NORTH 89°43'42" EAST ALONG THE CENTERLINE OF SAID THIRD STREET, 45.00 FEET;
THENCE SOUTH 00°16'18" EAST, PERPENDICULAR TO SAID CENTERLINE, 30.00 FEET TO A PARALLEL LINE, 30.00 FEET SOUTH OF SAID CENTERLINE OF THIRD STREET AND THE TRUE POINT OF BEGINNING;
THENCE SOUTH 44°43'43" WEST, 14.14 FEET TO A POINT ON THE WESTERLY

PROLONGATION OF THE SOUTH LINE OF SAID THIRD STREET, SAID SOUTH LINE BEING PARALLEL WITH AND 40.00 FEET SOUTH OF SAID CENTERLINE OF THIRD STREET, AS SHOWN ON SAID RECORD OF SURVEY;
THENCE NORTH 89°43'42" EAST ALONG SAID PARALLEL LINE, 91.44 FEET TO THE WESTERLY CORNER OF PARCEL 6643-1.3 PER GRANT DEED TO THE STATE OF CALIFORNIA RECORDED JUNE 13, 1989 AS INSTRUMENT NUMBER 193499 OF OFFICIAL RECORDS OF SAID COUNTY;

THENCE CONTINUING ALONG SAID LAND GRANTED TO THE STATE OF CALIFORNIA THE FOLLOWING TWO (2) COURSES AS SHOWN BY SAID RECORD OF SURVEY; SOUTH 77°26'27" EAST, 135.09 FEET
NORTH 89°43'42" EAST, 66.83 FEET TO AN ANGLE POINT ON THE BOUNDARY OF

SAID LAND GRANTED TO THE STATE OF CALIFORNIA, SAID POINT BEING ON THE WEST LINE OF BEAUMONT AVENUE (STATE HIGHWAY 79) AS SHOWN ON SAID RECORD OF SURVEY;
PAGE 1 OF 4 PAGES

Page 911 of 1100 ends

EXHIBIT "A" - LEGAL DESCRIPTION
STREET RIGHT-OF-WAY VACATION No. 2023-SV-002

PARCEL 'A' (CONTINUED)
THENCE NORTH 00°17'23" WEST ALONG SAID WEST LINE, 70.00 FEET TO SAID

CENTERLINE OF THIRD STREET, BEING ALSO A POINT ON A NON -TANGENT CURVE, CONCAVE NORTHWESTERLY, HAVING A RADIUS OF 48.00 FEET, A RADIAL LINE TO SAID POINT BEARS NORTH 89°43'42" EAST;

THENCE SOUTHWESTERLY ALONG SAID NON -TANGENT CURVE, AN ARC LENGTH OF

87.97 FEET THROUGH A CENTRAL ANGLE OF 105°00'34" TO THE BEGINNING OF A TANGENT LINE;
THENCE NORTH 75°15'44" WEST, 50.01 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE SOUTHERLY, HAVING A RADIUS OF 100.00 FEET;
THENCE WESTERLY ALONG SAID TANGENT CURVE, AN ARC LENGTH OF 26.20 FEET THROUGH A CENTRAL ANGLE OF 15°00'33" TO A LINE PARALLEL WITH AND 30.00 FEET

SOUTH OF (AS MEASURED AT RIGHT ANGLES) SAID CENTERLINE OF THIRD STREET, THENCE SOUTH 89°43'42" WEST ALONG SAID PARALLEL LINE,
145.33 FEET TO THE TRUE POINT OF BEGINNING.

CONTAINS 5,737 SQUARE FEET, MORE OR LESS.

SUBJECT TO ALL COVENANTS, RESERVATIONS, RIGHTS, RIGHT-OFWAYS AND EASEMENTS OF RECORD, IF ANY.

SEE EXHIBIT "B" ATTACHED HERETO AND BY THIS REFERENCED MADE A PART HEREOF.

PAGE 2 OF 4 PAGES

Page 912 of 1100 ends

EXHIBIT "A" - LEGAL DESCRIPTION
STREET RIGHT-OF-WAY VACATION No. 2023-SV-002

PARCEL 'B'

IN THE CITY OF BEAUMONT, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA, THAT

PORTION OF THE EAST HALF OF EUCLID AVENUE, AND ALL THAT CERTAIN PORTION OF BLOCK 144 OF THE AMENDED MAP FOR THE TOWN OF BEAUMONT AS SHOWN BY MAP ON FILE IN BOOK 6, PAGES 16 AND 17 OF MAPS, RECORDS OF SAN BERNARDINO COUNTY, LYING WITHIN SECTION 10, TOWNSHIP 3 SOUTH, RANGE 1 WEST OF THE SAN BERNARDINO MERIDIAN, MORE PARTICULARLY DESCRIBED AS FOLLOWS;

COMMENCING AT THE CENTERLINE INTERSECTION OF THIRD STREET AND EUCLID AVENUE AS SHOWN BY RECORD OF SURVEY FILED IN BOOK 158, PAGE 89 OF RECORDS OF SURVEY;
THENCE NORTH 89°43'42" EAST ALONG THE CENTERLINE OF SAID THIRD STREET,

45.00 FEET;
THENCE SOUTH 00°16'18" EAST, PERPENDICULAR TO SAID CENTERLINE, 30.00 FEET TO A PARALLEL LINE, 30.00 FEET SOUTH OF SAID CENTERLINE OF THIRD STREET; THENCE SOUTH 44°43'43" WEST, 14.14 FEET TO A POINT ON THE WESTERLY

PROLONGATION OF THE SOUTH LINE OF SAID THIRD STREET, SAID SOUTH LINE BEING PARALLEL WITH AND 40.00 FEET SOUTH OF SAID CENTERLINE OF THIRD

STREET, AS SHOWN ON SAID RECORD OF SURVEY, AND THE TRUE POINT OF BEGINNING;
THENCE NORTH 89°43'42" EAST ALONG SAID WESTERLY PROLONGATION, 5.00 FEET

TO THE EAST LINE OF SAID EUCLID AVENUE AS SHOWN ON SAID RECORD OF

SURVEY, BEING ALSO THE EAST LINE OF THAT PARCEL OF LAND GRANTED TO THE STATE OF CALIFORNIA BY GRANT DEED RECORDED JUNE 13, 1989 AS INSTRUMENT NUMBER 193499 OF OFFICIAL RECORDS OF SAID COUNTY,
PAGE 3 OF 4 PAGES

Page 913 of 1100 ends

EXHIBIT "A" - LEGAL DESCRIPTION
STREET RIGHT-OF-WAY VACATION No. 2023-SV-002

PARCEL 'B' (CONTINUED)
THENCE SOUTH 00°16'16" EAST ALONG SAID EAST LINE, 520.24 FEET TO THE

CENTERLINE OF SECOND STREET (VACATED), AS SHOWN ON SAID RECORD OF SURVEY MAP;
THENCE SOUTH 89°42'45" WEST ALONG SAID CENTERLINE, 10.00 FEET TO A PARALLEL LINE, 30.00 FEET EAST OF SAID CENTERLINE OF EUCLID AVENUE; THENCE NORTH 00°16'16" WEST ALONG SAID PARALLEL LINE, 515.24 FEET; THENCE NORTH 44°43'43" EAST, 7.07 FEET TO THE TRUE POINT OF BEGINNING.

CONTAINS 5,190 SQUARE FEET, MORE OR LESS.

SUBJECT TO ALL COVENANTS, RESERVATIONS, RIGHTS, RIGHT-OFWAYS AND EASEMENTS OF RECORD, IF ANY.

SEE EXHIBIT "B" ATTACHED HERTO AND BY THIS REFERENCED MADE A PART HEREOF.

PAGE 4 OF 4 PAGES

Page 914 of 1100 ends

EXHIBIT "B" - MAP
STREET RIGHT-OF-WAY VACATION No. 2023-SV-002

EUCLID AVENUE
r
NORTH
0 60
120
1"=60'
SEC. 10, T.3S., R.1W., S.B.M.
—4
(o
0 C
z
SEE PAGE 2

SURVEYOR'S NOTES
- INDICATES STATE OF CALIFORNIA

RIGHT-OF-WAY PER GRANT DEED
RECORDED JUNE 13, 1989 AS INSTRUMENT
No. 193499, O.R.
- INDICATES AREA OF VACATION AS
DESCRIBED IN ATTACHED EXHIBIT "A"
P.O.C. - INDICATES POINT OF COMMENCEMENT
T.P.O.B. -- INDICATES TRUE POINT OF BEGINNING
( ) - INDICATES RECORD DATA PER RS 158/89.

T.P.O.B. THIRD STREET
(N 89°43'42" E 324.96')
? S 89°43'42" W 145.33' — _i Cl
L6 I —
6 iS 6'27" E 135.099
�
RS 158/89 RIV. CO.
5 4
POR. BLOCK 144
MB 6/16&17 S.B.CO.

CURVE DATA
CURVE
RADIUS
LENGTH
DELTA

TANGENT
C1
100.00'

26.20'
15°00'33"

13.17'
C2

48.00'

87.97'
105°00'34"

62.57'

LINE DATA
LINE

BEARING

DISTANCE
L1
N 89°43'42" E

45.00'
L2
S 00°16'18" E

30.00'
L3
N 75°15'44" W

50.01'
L4
(N 00°17'23" W)
(70.00')
L5
(N 89°43'42" E)
(66.83')
L6
N 89°43'42" E

91.44'
L7
S 44°43'43" W

14.14'
L5

PARCEL 'A'
5,737 SQ. FT.
3 I 2
`.L
J
BEAUMONT AVENUE (HWY 79)
PAGE 1 OF 2 PAGES

Page 915 of 1100 ends

EXHIBIT "B" - MAP
STREET RIGHT-OF-WAY VACATION No. 2023-SV-002

SURVEYOR'S NOTES
- INDICATES STATE OF CALIFORNIA

RIGHT-OF-WAY PER GRANT DEED
RECORDED JUNE 13, 1989 AS INSTRUMENT
No. 193499, O.R.
-- INDICATES AREA OF VACATION AS
DESCRIBED IN ATTACHED EXHIBIT "A"
P.O.C. INDICATES POINT OF COMMENCEMENT
T.P.O.B.
- INDICATES TRUE POINT OF BEGINNING
( ) - INDICATES RECORD DATA PER RS 158/89.

P.O.C.

T.P.O.B L1 --1T
L8
L11-,
� I
3 40'

THIRD STREET
_ N 89°43'42" E
b • SEE PAGE 1
L9
W
z I N
Lu
Q �
0 J
U
D
o
0 z
w
0 O
6 5 1 4 1 3

PARCEL 'B'
5,190 SQ. FT.

F

LINE DATA
LINE

BEARING

DISTANCE
L1
N 89°43'42" E

45.00'
L2
N 00°16'18" W

30.00'
L8
S 44°43'43" W

14.14'
L9
N 89°43'42" E

5.00'
L10
S 89°42'45" W

10.00'
L11
N 44°43'43" E

7.07'
I 2 I
I
I I
I I
L _I
8 II 7
-RS 158/89 RIV. CO. -
10 I I 9
- POR. BLOCK 144- -
12 11
-MB 6/16&17 S.B.CO.-
14 I I 13
I I
16 I I 15

SECOND STREET
(VACATED)
L10
BEAUMONT AVENUE (HWY 79)
0 oN
NORTH
100
200
1"=100'
SEC. 10, T.3S., R.1W., S.B.M.

PAGE 2 OF 2 PAGES

Page 916 of 1100 ends

THE PRESS -ENTERPRISE

KEEP YOUR EYES ON THE 'PRISE
pe.com
3512 14 Street
Riverside, California 92501
(951) 368-9229
[email protected]
City of Beaumont
550 E. 6th Street
Beaumont, California 92223
Account Number:

Ad Order Number:

Customer's Reference/PO Number:

Publication:

Publication Dates:

Total Amount:

Payment Amount:

Amount Due:

Notice ID:

Invoice Text:
5209298
0011697867
The Press -Enterprise
10/18/2024
$243.07
$0.00
$243.07
J1ufdSdRVkM51r5YvOKo
LEGAL ADVERTISEMENT NOTICE IS HEREBY GIVEN, that the City of Beaumont will conduct a public hearing to consider the matter described below. The City of Beaumont's public hearing will be held at 6:00 p.m. on Tuesday, November 5, 2024, at 550 East Sixth Street, Beaumont, California. The public street, E 3rd Street, is to be vacated by the City of Beaumont, between Euclid Avenue and 300 feet east of Euclid Avenue. The vacation of E 3rd Street shall be in accordance with California Streets and Highway Code Chapter 3, Section 8320-8325. The public street, Euclid Avenue, is to be vacated by the City of Beaumont, between E 3rd Street and 560 feet south of E 3rd Street. The vacation of Euclid Avenue shall be in accordance with California Streets and Highway Code Chapter 3, Section 8320-8325. This meeting will be open to the public and will be recorded for live streaming. Please use the following link during the meeting for live stream access: BeaumontCa.gov/Livestream Public comments will be accepted using the following options: 1. Emailed comments will be read aloud during the corresponding item of the meeting. Please submit your comments to [email protected] 2. In person public comments. 3. Call -in comments using a teleconference phone line (951) 922-4845. City Council will conduct a public hearing to receive testimony and comments from all interested persons. Public comments shall not exceed three minutes unless otherwise authorized by City Council. Comments can be submitted any time prior to the meeting as well as during the meeting until the end of the corresponding item. Dated: October 15, 2024

Page 917 of 1100 ends

Euclid 3rd Street Vacation - Page 1 of 1

THE PRESS -ENTERPRISE

KEEP YOUR EYES ON THE 'PRISE
The Press -Enterprise
3512 14 Street
Riverside, California 92501
(951) 368-9229
City of Beaumont
550 E. 6th Street
Beaumont, California 92223
Publication: The Press -Enterprise

PROOF OF PUBLICATION OF
Ad Desc: 0011697867
FILE NO. 0011697867

PROOF OF PUBLICATION
I am a citizen of the United States. I
am over the age of eighteen years and
not party to or interested in the above -
entitled matter. I am an authorized
representative of THE PRESS -
ENTERPRISE, a newspaper of general
circulation, printed and published daily
in the County of Riverside, and which
newspaper has been adjudicated a
newspaper of general circulation by the
Superior Court of the County of
Riverside, State of California, under
date of April 25, 1952, Case Number
54446, under date of March 29, 1957,
Case Number 65673, under date of
August 25, 1995, Case Number
267864, and under date of September
16, 2013, Case Number RIC 1309013;
that the notice, of which the annexed is
a printed copy, has been published in
said newspaper in accordance with the
instructions of the person(s) requesting
publication, and not in any supplement
thereof on the following dates, to wit:
10118/2024
I certify (or declare) under the penalty
of perjury that the foregoing is true and
correct.

Date: October 18, 2024.

At: Riverside, California
Signature

LEGAL ADVERTISEMENT
NOTICE IS HEREBY GIVEN, that the City of Beaumont will conduct a public hearing to consider the matter described below. The City of Beaumont's public hearing will be held at 6:00 p.m. on Tuesday, November 5, 2024, at 550 East Sixth Street, Beaumont, California.

The public street, E 3rd Street, is to be vacated by the City of Beaumont, between Euclid Avenue and 300 feet east of Euclid Avenue. The vacation of E 3rd Street shall be in accordance with California Streets and Highway Code Chapter 3, Section 8320-8325.

The public street, Euclid Avenue, is to be vacated by the City of Beaumont, between E 3rd Street and 560 feet south of E 3rd Street.

The vacation of Euclid Avenue shall be in accordance with California Streets and Highway Code Chapter 3, Section 8320-8325.

This meeting will be open to the public and will be recorded far live streaming. Please use the following link during the meeting far live stream access:

BeaumontCa.gov/Livestream
Public comments will be accepted using the following options:

1. Emalled comments will be read aloud during the corresponding Item of the meeting. Please submit your comments to NieoleW@ BeaumontCa.gav

2. In person public comments.

3. Call -in comments using a teleconference phone line (951) 922-4845.

City Council will conduct a public hearing to receive testimony and comments from all Interested persons. Public comments shall not exceed three minutes unless otherwise authorized by City Council.

Comments can be submitted any time prior to the meeting as well as during the meeting until the end of the corresponding Item.

Dated: October 15, 2024
The Press -Enterprise
Published: 10/18/24

Page 918 of 1100 ends

Euclid 3rd Street Vacation - Page 1 of 1

LEGISLATIVE INFORMATION
Home Bill Information
California Law
Publications Other Resources My Subscriptions My Favorites Code: Select Code v Section: 1 or 2 or 1001
Search
Up^ Add To My Favorites

STREETS AND HIGHWAYS CODE - SHC
DIVISION 9. CHANGE OF GRADE AND VACATION [8000 - 8363] (Division 9 added by Stats. 1941, Ch. 79. ) PART 3. PUBLIC STREETS, HIGHWAYS, AND SERVICE EASEMENTS VACATION LAW [8300 - 8363] (Part 3 repealed and added by Stats. 1980, Ch. 1050, Sec. 29. )
CHAPTER 3. General Vacation Procedure [8320 - 8325] ( Chapter 3 added by Stats. 1980, Ch. 1050, Sec. 29. ) 8320. (a) The legislative body of a local agency may initiate a proceeding under this chapter in either of the following ways:
(1) On its own initiative, where the clerk of the legislative body shall administratively set a hearing by fixing the date, hour, and place of the hearing and cause the publishing and posting of the notices required by this chapter. (2) Upon a petition or request of an interested person, at the discretion of the legislative body, except as provided in subdivision (e) of Section 8321, where the clerk of the legislative body shall administratively set a hearing by fixing the date, hour, and place of the hearing and cause the publishing and posting of the notices required by this chapter.
(b) The notices required by this chapter shall contain both of the following:
(1) A description of the street, highway, or public service easement proposed to be vacated and a reference to a map or plan, that shows the portion or area to be vacated and includes a statement that the vacation proceeding is conducted under this chapter. In the case of a street or highway, the description shall include its general location, its lawful or official name or the name by which it is commonly known, and the extent to which it is to be vacated.

In the case of a public service easement, the description shall identify it with common certainty. The map or plan showing the location of the street, highway, or public easement proposed to be vacated is sufficient compliance with this paragraph.
(2) The date, hour, and place for hearing all persons interested in the proposed vacation. The date shall not be less than 15 days after the initiation of proceedings.
(Amended by Stats. 1998, Ch. 876, Sec. 20. Effective January 1, 1999.) 8321. (a) Ten or more freeholders may petition the board of supervisors to vacate a street or highway under this chapter. At least two of the petitioners shall be residents of the road district in which some part of the street or highway proposed to be vacated is situated and shall be taxable therein for street or highway purposes. (b) Five or more freeholders may petition the board of supervisors to vacate a public service easement under this chapter. At least one of the petitioners shall be a resident of the township in which the public service easement proposed to be vacated is situated.
(c) The residence address of each petitioner shall be set forth in the petition. (d) The board of supervisors may require the payment of a fee for filing a petition to defray the expenses of investigations, mailings, publications, and postings under this chapter. (e) Upon the filing of a petition and the making of the deposit, if any, required under this section, the board of supervisors, by order, shall fix the date, hour, and place of the hearing on the petition. At least two weeks before the day set for the hearing, the clerk of the board shall mail a notice of the date, hour, and place of the hearing to each of the petitioners at the address set forth in the petition. (f) Nothing in this section shall affect the right ff a lle6ilItiv ibboix to initiate a proceeding under this chapter upon its own initiative, or upon petition or request o interested p rUUs n, or prevent the board of supervisors from

vacating a street, highway, or public service easement without charging costs if the board determines it is in the public interest to do so.
(Amended by Stats. 1981, Ch. 64, Sec. 1.)
8322. (a) Except as provided in subdivisions (b) and (c), notice of the hearing on the proposed vacation shall be published for at least two successive weeks prior to the hearing in a daily, semiweekly, or weekly newspaper published and circulated in the local agency conducting the proceeding and which is selected by the legislative body for that purpose or by the clerk or other officer responsible for the publication where the legislative body has not selected any newspaper for that purpose.
(b) If the proceeding is conducted by a city and there is no daily, semiweekly, or weekly newspaper published and circulated in the city, the notice shall be published in some newspaper published in the county in which the city is located.
(c) Notice need not be published under this section where there is no daily, semiweekly, or weekly newspaper published and circulating in the county in which the local agency conducting the proceeding is located. (Amended by Stats. 1998, Ch. 876, Sec. 21. Effective January 1, 1999.) 8323. At least two weeks before the day set for the hearing, the legislative body shall post conspicuously notices of vacation along the line of the street, highway, or public service easement proposed to be vacated. The notices shall be posted not more than 300 feet apart, but at least three notices shall be posted. If the line of the street, highway, or public service easement proposed to be vacated exceeds one mile in length, the legislative body may, in lieu of posting not more than 300 feet apart, post notices at each intersection of another street or highway with the street, highway, or public service easement to be vacated and at one point approximately midway between each intersection, but at least three notices shall be posted. (Amended by Stats. 1998, Ch. 876, Sec. 22. Effective January 1, 1999.) 8324. (a) At the hearing, the legislative body shall hear the evidence offered by persons interested. (b) If the legislative body finds, from all the evidence submitted, that the street, highway, or public service easement described in the notice of hearing or petition is unnecessary for present or prospective public use, the legislative body may adopt a resolution vacating the street, highway, or public service easement. The resolution of vacation may provide that the vacation occurs only after conditions required by the legislative body have been satisfied and may instruct the clerk that the resolution of vacation not be recorded until the conditions have been satisfied.
(Amended by Stats. 1998, Ch. 876, Sec. 23. Effective January 1, 1999.) 8325. (a) The clerk shall cause a certified copy of the resolution of vacation, attested by the clerk under seal, to be recorded without acknowledgment, certificate of acknowledgment, or further proof in the office of the recorder of the county in which the property is located. No fee shall be charged for recordation. (b) Upon such recordation, the vacation is complete.
(Added by Stats. 1980, Ch. 1050, Sec. 29.)

Page 920 of 1100 ends

LEGISLATIVE INFORMATION
Home Bill Information
California Law
Publications Other Resources My Subscriptions My Favorites Code: Select Code v Section: 1 or 2 or 1001
Search
Up^ Add To My Favorites

STREETS AND HIGHWAYS CODE - SHC
DIVISION 9. CHANGE OF GRADE AND VACATION [8000 - 8363] (Division 9 added by Stats. 1941, Ch. 79. ) PART 3. PUBLIC STREETS, HIGHWAYS, AND SERVICE EASEMENTS VACATION LAW [8300 - 8363] (Part 3 repealed and added by Stats. 1980, Ch. 1050, Sec. 29. )
CHAPTER 5. Reservation and Preservation of Easements [8340 - 8349] ( Chapter 5 added by Stats. 1980, Ch. 1050, Sec. 29. )
ARTICLE 1. Reservation of Easements [8340 - 8341] (Article 1 added by Stats. 1980, Ch. 1050, Sec. 29. ) 8340. In a proceeding to vacate a street or highway:
(a) A public entity may reserve and except from the vacation the easement and right at any time, or from time to time, to construct, maintain, operate, replace, remove, and renew sanitary sewers and storm drains and appurtenant structures in, upon, over, and across a street or highway proposed to be vacated and, pursuant to any existing franchise or renewals thereof, or otherwise, to construct, maintain, operate, replace, remove, renew, and enlarge lines of pipe, conduits, cables, wires, poles, and other convenient structures, equipment, and fixtures for the operation of gas pipelines, telegraphic and telephone lines, railroad lines, and for the transportation or distribution of electric energy, petroleum and its products, ammonia, and water, and for incidental purposes, including access to protect these works from all hazards in, upon, and over the street or highway proposed to be vacated.
(b) A local agency may reserve and except from vacation an easement for a future street or highway, unless the local agency finds that the street or highway is unnecessary for prospective public use. (c) If there are in -place public utility facilities that are in use, a public entity shall, unless the legislative body determines the public convenience and necessity otherwise require, reserve, and except from the vacation any easement and right necessary to maintain, operate, replace, remove, or renew the public utility facilities. (d) A public entity may reserve and except from the vacation, or may grant to another state or local public agency, an easement and right, at any time or from time to time, to construct, maintain, operate, replace, remove, and renew vehicular or nonvehicular trails for use by the public in, upon, over, and across a street or highway proposed to be vacated.
(Amended by Stats. 1990, Ch. 248, Sec. 1.)
8341. (a) In a proceeding to vacate a street or highway, if the legislative body determines that the public convenience and necessity require the reservation and exception of easements and rights -of -way for works enumerated in Section 8340, such reservations and exceptions shall be recited in the resolution of vacation, in addition to any other matter required to be recited therein. The recital may describe the reservations and exceptions by reference to a precise map which is recorded or to which reference is made in the resolution and which is permanently maintained by the public entity.
(b) Subsequent proceedings of the public entity in relation to the vacation, including a deed or conveyance of title to or an interest in the property, are subject to, and governed by, the reservations and exceptions recited in the resolution of vacation and the deed or conveyance shall contain a recital to that effect. (Added by Stats. 1980, Ch. 1050, Sec. 29.)

Page 921 of 1100 ends

The public street, E. 3rd St, is to
be vacated by the City of Beaumont,
between Euclid Ave. and 300 Feet East Euclid Ave.

The vacation of E. 3rd St. shall be
in accordance with California
Streets and Highway Code Chapter
3, Section 8320-8325.

The public hearing for the proposed
vacation is scheduled on November 5, 2024
at the Beaumont City Hall
starting at 6:00 PM.

BEAUMONT
—CALIFORNIA—

Page 922 of 1100 ends

Picture 1 of Third Street Posting (Looking East)
Picture 2 of Third Street Posting
T The public street, E. 3rd St,
is I I vacated bythe City
ofBeaumont,behveen
EuclidAve. and
vacation300 Feet East Euclid Ave.

The of
in accordance
SectionStreets and Highway Code Chapter 3,
8320-8325.

The public hearing for
proposed vacation scheduled
on November
Beaumont I 6:00 pm.
r

EAUMONT

Page 923 of 1100 ends

The public street, Euclid Ave, is to
be vacated by the City of Beaumont,
between E. 3rd St. and 560 feet South E. 3rd St.

The vacation of Euclid shall be
in accordance with California
Streets and Highway Code Chapter
3, Section 8320-8325.

The public hearing for the proposed
vacation is scheduled on November 5, 2024
at the Beaumont City Hall
starting at 6:00 PM.

BEAUMONT
—CALIFORNIA—

Page 924 of 1100 ends

Picture 1 of Euclid Avenue Posting (Looking North)
Picture 2 of Euclid Avenue Posting
The public skeet. Euclid Are,
is to be vacated ty
the City 111 Beaumont, between
E. 3rd St. and
biBfeet South E.3rd5t.
;he vacation el Euclid shall be
in accordance with Caliiarnia
Streets and Highway Code Chapter 3,
Section B32D-8325.

The pudic tearing IT the
proposed uacatinn is scheduled
an NO+rember 5, Hatti slatting 9 at4 at 6:00 Beaumont tit! 6a pm.

OPEN
ENCH

Page 925 of 1100 ends

BAUME ONTA -c A L I F O R N I
Staff Report
TO: City Council
FROM: Doug Story, Community Services Director
DATE November 5, 2024
SUBJECT: Approve a Second Amendment to the Professional Services Agreement with PlaceWorks to Provide Additional Environmental Services for Capital Improvement Project P-10 in the Amount of $28,765 and Authorize the City Manager to Approve any Necessary Change Ord
Description Second Amendment to the Professional Services Agreement to include National Environmental Policy Act (NEPA) compliance services for the Stewart Park Improvement Project (CIP P-10).

Background and Analysis:

On April 5, 2022, the City Council awarded a Professional Services Agreement to PlaceWorks in an amount not to exceed $647,971 for landscaping and architectural services for Capital Improvement Project P-10 Stewart Park Improvements. In March of 2024 PlaceWorks submitted the complete design plans and documents for the project.

The firm also assisted in the development of the Request for Bids (RFB). On June 18, 2024, the City Council approved a First Amendment to the Professional Services Agreement with PlaceWorks in an amount not to exceed $154,235 to provide construction administration services, as well as authorizing the City Manager to sign any contingencies up to $15,424.

The scope of work for the Professional Services Agreement included environmental services to specifically comply with State requirements under the California Environmental Quality Act (CEQA). Due to the potential use of Federal funds, the City will also need to follow Federal environmental requirements under the National Environmental Policy Act (NEPA) for the successful completion of the project.

Staff requested a proposal from PlaceWorks Inc. to provide the additional services necessary to ensure NEPA compliance. In response, PlaceWorks submitted a proposal (Attachment B) in the amount of $28,765 to perform the required services.

Due to PlaceWorks expertise and as the primary consultant on the project, staff recommends that the City Council approve the second amendment to the Professional Services Agreement between PlaceWorks Inc. and the City of Beaumont.

Page 926 of 1100 ends

Fiscal Impact:

Expenditures associated with the additional services are included in the budget for Capital Improvement Project (CIP) P-10. There is no further impact on the general fund.

CIP P-10 Stewart Park Project Funding Summary
Estimated Project Cost= $13,576,008
CIP P-10 Stewart Park Project Budget Summary
Project
Com•onent
Budget Encumbered Paid to Date Remaining
Bud • et
Project Management
Preliminary Services
$6,415 $(4,515) $(4,515) $1,900
Design
$697,886 $(697,886) $(669,152)
$13,680 I $(13,680)
Right -of -Way
Construction $12,610,562 $(11,369,148) $(1,567,564)
Construction Management
$210,234 $(154,235) $(9,233) $55,999
Total
$13,576,008
$(12,245,053)
$(2,269,733)
$1,330,955
The cost to prepare this staff report is estimated to be $280.

Recommended Action:

Approve a Second Amendment to the Professional Services Agreement with PlaceWorks to Provide Additional Environmental Services for Capital Improvement

Page 927 of 1100 ends

Project P-10 in the amount of $28,765 and Authorize the City Manager to Approve any Necessary Change Orders in an Amount Not to Exceed $2,876.

Attachments:

A. Second Amendment to Professional Services Agreement.

B. PlaceWorks Proposal
C. Original PSA
D. Levine Act Statement

Page 928 of 1100 ends

City of Beaumont Contract Number:

C22-19.2

SECOND AMENDMENT TO AGREEMENT FOR INDEPENDENT CONTRACTOR

THIS SECOND AMENDMENT TO AGREEMENT OF SERVICES BY INDEPENDENT CONTRACTOR ("Amendment") is made and effective upon signature by and between the CITY OF BEAUMONT ("CITY"), a general law city, and PLACEWORKS, INC., A California Corporation (hereinafter called "CONTRACTOR") in consideration of the mutual promises and purpose contained herein, the parties agree as follow:

RECITALS
This Amendment is made with respect to the following facts and purpose that the parties agree are true and correct:

A. On April 5, 2022, CITY and CONTRACTOR entered into that certain agreement entitled "Agreement for Professional Services by Independent Contractor ("Agreement") to provide landscape, architecture, and engineering design services and construction documents for the Stewart Park Improvement Project.

B. On June 18, 2024, CITY and CONTRACTOR executed the first amendment to the agreement entitled "FIRST AMENDMENT TO AGREEMENT FOR
INDEPENDENT CONTRACTOR" to provide construction administration services for the Stewart Park Improvement Project.

C. City has requested a further change in scope of work under the Agreement regarding NEPA Compliance and CONTRACTOR has requested that the Compensation should be increased as provided in the Proposal, copy of which is attached hereto as Exhibit "A" and incorporated herein by this reference.

AMENDMENT
Section 1 of the Agreement is hereby amended to add "CONTRACTOR agrees to provide the services ("Services") as follows: NEPA Services ("Services") per Exhibit "A" dated May 23, 2024, and any other services which the City may request in writing.

All Services shall be performed in the manner and according to the timeframe set forth in the Proposal. CONTRACTOR designates Kara Kosel as CONTRACTOR's professional responsible for overseeing the Services provided by CONTRACTOR." Section 4.01 of the Agreement is hereby amended to increase the maximum compensation under the Agreement as follows: Under the original agreement, compensation was set at Six Hundred Forty -Seven Thousand, Nine Hundred Seventy - One Dollars and Zero Cents ($647,971). Per this First Amendment, compensation was increased by the maximum amount of One Hundred and Fifty -Four Thousand, Two Hundred Thirty -Five Dollars ($154,235). Per this Second Amendment, compensation is increased to the maximum amount of Twenty -Eight Thousand Seven Hundred Sixty Five dollars ($28,765), to be billed in accordance with the Proposal attached hereto as Exhibit

Page 929 of 1100 ends

City of Beaumont Contract Number:

C22-19.2
"A", resulting in total compensation under the Agreement not to exceed Eight Hundred Thirty Thousand and Nine Hundred and Seventy One dollars. ($830,971).

Page 930 of 1100 ends

City of Beaumont Contract Number:

C22-19.2
IN WITNESS WHEREOF, the parties hereby have made and executed this Amendment to be effective as of the day and year first above written.

SIGNATURE PAGE TO SECOND AMENDMENT TO AGREEMENT FOR

SERVICES BY INDEPENDENT CONTRACTOR

CITY OF BEAUMONT
CITY:

CITY OF BEAUMONT
CONTRACTOR:

PlaceWorks, Inc.

By: O `' ) . 4)15-" Q_
By: Print Name: Kara Kosel
David Fenn, Mayor
Title: Vice President
ATTEST:

By:

Nicole Wheelright, Deputy City Clerk
APPROVED AS TO FORM:

By:

John O. Pinkney, City Attorney

Page 931 of 1100 ends

City of Beaumont Contract Number:

C22-19.2
EXHIBIT "A"

PROPOSAL

Page 932 of 1100 ends

PLACEWORKS
October 2, 2024
Doug Story
Community Services Director

CITY OF BEAUMONT
550 E. 6th Street
Beaumont, CA 92223
Subject: Stewart Park Renovation Project NEPA Services Amendment No. 1 (Project Number:

BEAU -02.0)
Dear Doug,
PlaceWorks' recommends the following amendment to our original scope of work for the Stewart Park Renovation Project (project), in order for the City of Beaumont (City) to obtain the required environmental clearance pursuant to the National Environmental Policy Act (NEPA), and federal grant requirements of the National Park Services (NPS) Land and Water Conservation Fund (LWCF).

Understanding of NEPA Requirements
Under the direction of the City, PlaceWorks has prepared the Notice of Exemption (NOE) for the project pursuant to requirement of the California Environment Quality Act (CEQA). PlaceWorks understands that the City is seeking additional funding opportunities through the NPS LWCF for the park, which requires preparation of environmental documentation pursuant to NEPA. PlaceWorks believes that based on the location, size, land use, and programming anticipated for the project, and as analyzed under the NOE, and to be approved by the City in February 2024, the project would qualify for a Categorical Exclusion (CE), as outlined in the NPS NEPA Handbook (2015), 3.3 (F)(5) and Department of the Interior (DOI), Categorical Exclusions 43 CFR Part § 46.205. These requirements are summarized below and form the basis for our assumptions in this scope of work.

Part 516, Chapter 12: Managing the NEPA Process, 12.5 Categorical Exclusions Part F. Action Related to Grant Programs:
a. Grants for the construction of new facilities within an existing park or recreation area, provided that the facilities will not:
b. Conflict with adjacent ownerships or land use, or cause a nuisance to adjacent owners or occupants, e.g., extend use beyond daylight hours;
c. Introduce motorized recreation vehicles;
d. Introduce active recreation pursuits into a passive recreation area; e. Increase public use or introduce noncompatible uses to the extent of compromising the nature and character of the property or causing physical damage to it; or e. add or alter access to the park from the surrounding area.
700 S. Flower Street, Suite 600 1 Los Angeles, California 90017 1 213.623.1443 1 PlaceWorks.com

Page 933 of 1100 ends

PLACEWORKS
Scope of Work
PlaceWorks assumes that the environmental analysis will largely reference and incorporate the results of the NOE that will be approved by the City in February 2024, with the exception of Section 106 compliance regarding historic -era structures and archeological resources. PlaceWorks believes any additional analysis required to adhere to requirements pursuant to NEPA would be limited in scope and not require further technical, quantitative analysis (i.e., Air Quality or Noise assessment modeling).

In accordance with the original scope of work for CEQA services for the Project, PlaceWorks environmental team has completed Tasks 6.1 through 6.3 of the scope and is currently completing Task 6.4 (filing the NOE). As such, PlaceWorks recommends the following new Tasks to meet NEPA requirements:

TASK 6.5. PROJECT INITIATION
Virtual Meeting. PlaceWorks' Principal in Charge (PIC) Addie Farrell and Project Manager (PM) Jennifer Kelley will coordinate a virtual meeting with the City to further PlaceWorks' understanding of the NPS expectations for the NEPA process, the existing condition of the project site, and to discuss the environmental clearance schedule.

Project Description. PlaceWorks understands that minor adjustments to the Project Description, as presented in the NOE, may be necessary to describe the components of the project that would utilize NPS funding. Prior to conducting the environmental analyses, PlaceWorks will first prepare a Project Description to comply with the NPS funding requirements. The Project Description will summarize the project information, project location, description of the project, and define the Area of Potential Effect (APE) (Project Site). The Project Description will be submitted to the City for review and comment. This scope of work assumes one round of review for this task.

TASK 6.6. ENVIRONMENTAL ANALYSIS
Extraordinary Circumstances. Pursuant to DOI 43 CFR Part §46.215 (Extraordinary Circumstances), PlaceWorks will prepare the appropriate documentation and analyses to address topics (a) through (I) to determine if any extraordinary circumstances exist, which would prohibit the use of a CE for environmental clearance. For each topic identified, PlaceWorks will provide a full description of the determination and a synopsis of the information that it was based on, such as:
• Map panel numbers and dates
• Names of all consulted parties and relevant consultation dates • Names of plans or reports and relevant page numbers
• Any additional requirements specific to the program or region PlaceWorks will then submit the report to the City for review and address one round of consolidated comments and edits from the City.

Section 106 Cultural Resources Assessment Report. PlaceWorks understands the project is subject Section 106 pursuant to NEPA. Cogstone (serving as a subconsultant to PlaceWorks), will conduct a cultural resources assessment in compliance with Section 106 of the National Historic October 2, 2024 1 Page 2

Page 934 of 1100 ends

PLACEWORKS
Preservation Act (NHPA) under NEPA. Cogstone's scope includes a records search for known cultural resources, a Sacred Lands File search, an intensive pedestrian survey, assistance with section 106 consultation, including Tribal consultation and correspondence with the State Historic Preservation Office (SHPO), as well as the preparation of a Cultural Resources Assessment Report (Cultural Report). The Cultural Report will characterize the results of the records search, consultation efforts to determine baseline conditions, assess potential impacts to cultural resources resulting from the project, and make appropriate recommendations to avoid or minimize any potentially significant impacts. DPR 523 forms will be appended to the report. Cogstone will respond to two rounds of comments and prepare the final report.

TASK 6.7. PROJECT MANAGEMENT
Throughout the NEPA process, internal team management and coordination with the City will be necessary to ensure timely and consistent delivery of high -quality services. Project management responsibilities include task scheduling and assignment; management of resources; monitoring of costs and schedule adherence; consultation and coordination with local, state, and federal entities relative to the environmental review process; and coordination and communications with the City to ensure compliance with policies, procedures, and any applicable codes.

Assumptions. Though unanticipated, if our research finds impacts that prohibit the use of an CE pursuant to NEPA PlaceWorks will discuss options with the City, such as making changes to the project, preparing an Environmental Assessment (EA) Environmental Impact Statement (EIS), or supplementing our research with additional technical studies or reports. These other options, if required, would trigger a change in our scope and cost. This Amendment also assumes that attendance at in -person meetings and/or hearings is not required.

Proposed Schedule
The following schedule assumes a four -month timeline from project initiation to the end Table 1. Proposed Schedule
Task
Duration
Task 6.5 Project Initiation
Virtual Meeting
Project Description
Two Weeks
Task 6.6 Environmental Analysis
Extraordinary Circumstances Documentation (PlaceWorks)
Section 106 Cultural Resources Assessment Report (Cogstone) Four Weeks*
Three Months
Task 6.7 Management and Coordination
Duration of Project
(total estimate four months)
* PlaceWorks will prepare the environmental analysis concurrently with the Section 106 Cultural Resources Assessment Report.

October 2, 2024 Page 3

Page 935 of 1100 ends

PLACEWORKS
Cost Estimate
Our cost estimate is provided below in Table 2. Costs are billed on a time and materials basis with monthly invoices. The balance required to complete tasks associated with the Addendum is $38,765. This would bring the total contract value from $647,971 to $676,736 for an amendment of $28,765.

Table 2. Cost Estimate
Task
Cost
Task 6.5 Project Initiation
$3,249
Task 6.6 Environmental Analysis
Extraordinary Circumstances Documentation (PlaceWorks)
7,905
Section 106 Cultural Resources Assessment Report (Cogstone) 21,373
Task 6.7 Project Management
6,140
Reimbursable Expenses
98 AMENDMENT SUBTOTAL
38,765
Task 6 Environmental Review (Approximate Budget Remaining to be Applied) 10,000

AMENDMENT GRAND TOTAL
28,765
Authorization
This Amendment shall remain valid for a period of 90 days from the time of submittal. As a Principal, I am authorized to bind the team to the contents of this submittal and to negotiate contracts on behalf of PlaceWorks. If you have any questions regarding the contents of this proposal, please feel free to contact me at 213.623.1443 x2119 or via email at [email protected].

Respectfully submitted,

PLACEWORKS
.4:44e€1
Addie Farrell
Principal, Environmental Services

Page 936 of 1100 ends

October 2, 2024 Page 4

EXHIBIT "B"

CERTIFICATES OF INSURANCE

Page 937 of 1100 ends

A� D® CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DDIYYYY)
07/01/2024
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER
Marsh Risk & Insurance Services
17901 Von Karman Avenue, Suite 1100
(949) 399-5800; License #0437153
Irvine, CA 92614
Attn: [email protected]/F: 212-948-4323 CN115158923--XS-24-25

CONTACT
NAME:

PHONE FAX
(AIC, No, Ext): (AIC, No):

E-MAIL
ADDRESS:

INSURER(S) AFFORDING COVERAGE
NAIC #
INSURER A : Crum & Forster Specialty Insurance Co
44520

INSURED
PlaceWorks, Inc
3 MacArthur Place, Suite 1100
Santa Ana, CA 92707
INSURER B : Travelers Property Casualty Co. Of America
25674
INSURER C : N/A
N/A
INSURER D :

INSURER E :

INSURER F :

COVERAGES
CERTIFICATE NUMBER:

LOS -002592320-07
REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

INSR
LTR

TYPE OF INSURANCE
ADDL
INSD
SUBR
WVD

POLICY NUMBER

POLICY EFF
(MM/DDIYYYY)

POLICY EXP
(MM/DDIYYYY)
LIMITS
A
X

COMMERCIAL GENERAL LIABILITY
X
X
EPK148300
07/01/2024
07/01/2025

EACH OCCURRENCE
$ 5,000,000

CLAIMS -MADE
X
OCCUR

DAMAGE RETED
PREMISESO( a occurrence)
$ 100,000
MED EXP (Any one person)
$ 10,000
X
BI & PD Ded. $5,000

PERSONAL & ADV INJURY
$ 5,000,000
GEN'L
X

AGGREGATE
POLICY
OTHER:

LIMIT APPLIES
PRO-
JECT
PER:

LOC

GENERAL AGGREGATE
$ 5,000,000

PRODUCTS - COMP/OP AGG
$ 5,000,000
Contractors Pollution
$ 5,000,000
B

AUTOMOBILE
X

LIABILITY

ANY AUTO
OWNED

SCHEDULED
AUTOS

NON -OWNED

AUTOS ONLY
X
X
BA-1N96406A-24-43-G
07/01/2024
07/01/2025

COMBINED SINGLE LIMIT
(Ea accident)
$ 1,000,000
BODILY INJURY (Per person)
$
BODILY INJURY (Per accident)
$

PROPERTY DAMAGE
(Per accident)
$
Comp/Coll Deductibles
$ 1,000
B
X

UMBRELLA LIAB

EXCESS LIAB
X
OCCUR

CLAIMS -MADE
EX -6J328756-24-43
07/01/2024
07/01/2025

EACH OCCURRENCE
$ 4,000,000

AGGREGATE
$ 4,000,000
DED
RETENTION $
$
B

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY

ANYPROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBEREXCLUDED?
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
YIN
N
N /A
X
UB-7K728676-24-43-G
07/01/2024
07/01/2025
X

STATUTE
OTH

E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE - EA EMPLOYEE
$ 1,000,000
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
Errors & Omissions -Claims Made
EPK148300
07/01/2024
07/01/2025
Each Claim/Aggregate
$ 5,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) City, its official's employees and agent are included as additional insured where required by written contract with respect to General and Auto Liability. This insurance is primary and non-contributory over any existing insurance and limited to liability arising out of the operations of the named insured and where required by written contract. Waiver of subrogation is applicable where required by written contract and subject to policy terms and conditions.

CERTIFICATE HOLDER

CANCELLATION
City of Beaumont
550 E. 6th Street
Beaumont, CA 92223

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

AUTHORIZED REPRESENTATIVE
7/1.4144Red Seweeed
ACORD 25 (2016/03)
© 1988-2016 ACORD CORPORATION. All rights reserved.

The ACORD namep eg§31?) coltAtiziNI marks of ACORD

AGENCY CUSTOMER ID: CN115158923
LOC #: Irvine
ACORD®

ADDITIONAL REMARKS SCHEDULE

Page 2 of 2 ends

AGENCY
Marsh Risk & Insurance Services

POLICY NUMBER

CARRIER

NAIC CODE

NAMED INSURED
PlaceWorks, Inc
3 MacArthur Place, Suite 1100
Santa Ana, CA 92707
EFFECTIVE DATE:

ADDITIONAL REMARKS

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance Subject to policy terms, conditions, limitations and exclusions.

ACORD 101 (2008/01)
© 2008 ACORD CORPORATION. All rights reserved.

The ACORD name aptIggPQe,geLgist'§IIENnarks of ACORD

Policy Number: BA -1 N96406A-24-43-G
Effective Date: 07/01/2024

COMMERCIAL AUTO
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

BUSINESS AUTO EXTENSION ENDORSEMENT
This endorsement modifies insurance provided under the following:

BUSINESS AUTO COVERAGE FORM
GENERAL DESCRIPTION OF COVERAGE — This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered.

A. BROAD FORM NAMED INSURED
B. BLANKET ADDITIONAL INSURED
C. EMPLOYEE HIRED AUTO
D. EMPLOYEES AS INSURED
E. SUPPLEMENTARY PAYMENTS — INCREASED
LIMITS
F. HIRED AUTO — LIMITED WORLDWIDE COV-
ERAGE — INDEMNITY BASIS
G. WAIVER OF DEDUCTIBLE — GLASS

PROVISIONS
A. BROAD FORM NAMED INSURED
The following is added to Paragraph A.1., Who Is
An Insured, of SECTION II — COVERED AUTOS
LIABILITY COVERAGE:

Any organization you newly acquire or form dur-
ing the policy period over which you maintain
50% or more ownership interest and that is not
separately insured for Business Auto Coverage.

Coverage under this provision is afforded only un-
til the 180th day after you acquire or form the or-
ganization or the end of the policy period, which-
ever is earlier.

B. BLANKET ADDITIONAL INSURED
The following is added to Paragraph c. in A.1.,
Who Is An Insured, of SECTION II — COVERED
AUTOS LIABILITY COVERAGE:

Any person or organization who is required under
a written contract or agreement between you and
that person or organization, that is signed and
executed by you before the "bodily injury" or
"property damage" occurs and that is in effect
during the policy period, to be named as an addi-
tional insured is an "insured" for Covered Autos
Liability Coverage, but only for damages to which
CAT3530215
H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF
USE — INCREASED LIMIT
I. PHYSICAL DAMAGE — TRANSPORTATION
EXPENSES — INCREASED LIMIT
J. PERSONAL PROPERTY
K. AIRBAGS
L. NOTICE AND KNOWLEDGE OF ACCIDENT OR
LOSS
M. BLANKET WAIVER OF SUBROGATION
N. UNINTENTIONAL ERRORS OR OMISSIONS
this insurance applies and only to the extent that
person or organization qualifies as an "insured"
under the Who Is An Insured provision contained
in Section II.

C. EMPLOYEE HIRED AUTO

1. The following is added to Paragraph A.1.,
Who Is An Insured, of SECTION II — COV-
ERED AUTOS LIABILITY COVERAGE:

An "employee" of yours is an "insured" while
operating an "auto" hired or rented under a
contract or agreement in an "employee's"
name, with your permission, while performing
duties related to the conduct of your busi-
ness.

2. The following replaces Paragraph b. in B.5.,
Other Insurance, of SECTION IV — BUSI-
NESS AUTO CONDITIONS:
b. For Hired Auto Physical Damage Cover-
age, the following are deemed to be cov-
ered "autos" you own:
(1) Any covered "auto" you lease, hire,
rent or borrow; and
(2) Any covered "auto" hired or rented by
your "employee" under a contract in
an "employee's" name, with your
© 2015 The Travelers Indemnity Company. All rights reserved. Page 1 of 4 Includes copyrighted material of Insurance Services Office, Inc. with its permission.

Page 940 of 1100 ends

Policy Number: BA -1 N96406A-24-43-G
Effective Date: 07/01/2024

COMMERCIAL AUTO
permission, while performing duties
related to the conduct of your busi-
ness.

However, any "auto" that is leased, hired,
rented or borrowed with a driver is not a
covered "auto".

D. EMPLOYEES AS INSURED
The following is added to Paragraph A.1., Who Is
An Insured, of SECTION II — COVERED AUTOS
LIABILITY COVERAGE:

Any "employee" of yours is an "insured" while us-
ing a covered "auto" you don't own, hire or borrow
in your business or your personal affairs.

E. SUPPLEMENTARY PAYMENTS — INCREASED
LIMITS

1. The following replaces Paragraph A.2.a.(2),
of SECTION II — COVERED AUTOS LIABIL-
ITY COVERAGE:
(2) Up to $3,000 for cost of bail bonds (in-
cluding bonds for related traffic law viola-
tions) required because of an "accident"
we cover. We do not have to furnish
these bonds.

2. The following replaces Paragraph A.2.a.(4),
of SECTION II — COVERED AUTOS LIABIL-
ITY COVERAGE:
(4) All reasonable expenses incurred by the
"insured" at our request, including actual
loss of earnings up to $500 a day be-
cause of time off from work.

F. HIRED AUTO — LIMITED WORLDWIDE COV-
ERAGE — INDEMNITY BASIS
The following replaces Subparagraph (5) in Para-
graph B.7., Policy Period, Coverage Territory,
of SECTION IV — BUSINESS AUTO CONDI-
TIONS:
(5) Anywhere in the world, except any country or
jurisdiction while any trade sanction, em-
bargo, or similar regulation imposed by the
United States of America applies to and pro-
hibits the transaction of business with or
within such country or jurisdiction, for Cov-
ered Autos Liability Coverage for any covered
"auto" that you lease, hire, rent or borrow
without a driver for a period of 30 days or less
and that is not an "auto" you lease, hire, rent
or borrow from any of your "employees",
partners (if you are a partnership), members
(if you are a limited liability company) or
members of their households.

Page 2 ends

(a) With respect to any claim made or "suit"
brought outside the United States of
America, the territories and possessions
of the United States of America, Puerto
Rico and Canada:
(i) You must arrange to defend the "in-
sured" against, and investigate or set-
tle any such claim or "suit" and keep
us advised of all proceedings and ac-
tions.
(ii) Neither you nor any other involved
"insured" will make any settlement
without our consent.
(iii) We may, at our discretion, participate
in defending the "insured" against, or
in the settlement of, any claim or
"suit".
(iv) We will reimburse the "insured" for
sums that the "insured" legally must
pay as damages because of "bodily
injury" or "property damage" to which
this insurance applies, that the "in-
sured" pays with our consent, but
only up to the limit described in Para-
graph C., Limits Of Insurance, of
SECTION II — COVERED AUTOS
LIABILITY COVERAGE.
(v) We will reimburse the "insured" for
the reasonable expenses incurred
with our consent for your investiga-
tion of such claims and your defense
of the "insured" against any such
"suit", but only up to and included
within the limit described in Para-
graph C., Limits Of Insurance, of
SECTION II — COVERED AUTOS
LIABILITY COVERAGE, and not in
addition to such limit. Our duty to
make such payments ends when we
have used up the applicable limit of
insurance in payments for damages,
settlements or defense expenses.
(b) This insurance is excess over any valid
and collectible other insurance available
to the "insured" whether primary, excess,
contingent or on any other basis.
(c) This insurance is not a substitute for re-
quired or compulsory insurance in any
country outside the United States, its ter-
ritories and possessions, Puerto Rico and
Canada.
© 2015 The Travelers Indemnity Company. All rights reserved.

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

Page 941 of 1100 ends

CA T3 53 02 15

Policy Number: BA -1 N96406A-24-43-G
Effective Date: 07/01/2024

COMMERCIAL AUTO
You agree to maintain all required or
compulsory insurance in any such coun-
try up to the minimum limits required by
local law. Your failure to comply with
compulsory insurance requirements will
not invalidate the coverage afforded by
this policy, but we will only be liable to the
same extent we would have been liable
had you complied with the compulsory in-
surance requirements.
(d) It is understood that we are not an admit-
ted or authorized insurer outside the
United States of America, its territories
and possessions, Puerto Rico and Can-
ada. We assume no responsibility for the
furnishing of certificates of insurance, or
for compliance in any way with the laws
of other countries relating to insurance.

G. WAIVER OF DEDUCTIBLE — GLASS
The following is added to Paragraph D., Deducti-
ble, of SECTION III — PHYSICAL DAMAGE
COVERAGE:

No deductible for a covered "auto" will apply to
glass damage if the glass is repaired rather than
replaced.

H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF
USE — INCREASED LIMIT
The following replaces the last sentence of Para-
graph A.4.b., Loss Of Use Expenses, of SEC-
TION III — PHYSICAL DAMAGE COVERAGE:

However, the most we will pay for any expenses
for loss of use is $65 per day, to a maximum of
$750 for any one "accident".

I. PHYSICAL DAMAGE — TRANSPORTATION
EXPENSES — INCREASED LIMIT
The following replaces the first sentence in Para-
graph A.4.a., Transportation Expenses, of
SECTION III — PHYSICAL DAMAGE COVER-
AGE:

We will pay up to $50 per day to a maximum of
$1,500 for temporary transportation expense in-
curred by you because of the total theft of a cov-
ered "auto" of the private passenger type.

J. PERSONAL PROPERTY
The following is added to Paragraph A.4., Cover-
age Extensions, of SECTION III — PHYSICAL
DAMAGE COVERAGE:

Personal Property
We will pay up to $400 for "loss" to wearing ap-
parel and other personal property which is:
(1) Owned by an "insured"; and
CA T3 53 02 15
(2) In or on your covered "auto".

This coverage applies only in the event of a total
theft of your covered "auto".

No deductibles apply to this Personal Property
coverage.

K. AIRBAGS
The following is added to Paragraph B.3., Exclu-
sions, of SECTION III — PHYSICAL DAMAGE
COVERAGE:

Exclusion 3.a. does not apply to "loss" to one or
more airbags in a covered "auto" you own that in-
flate due to a cause other than a cause of "loss"
set forth in Paragraphs A.1.b. and A.1.c., but
only:
a. If that "auto" is a covered "auto" for Compre-
hensive Coverage under this policy;
b. The airbags are not covered under any war-
ranty; and
c. The airbags were not intentionally inflated.

We will pay up to a maximum of $1,000 for any
one "loss".

L. NOTICE AND KNOWLEDGE OF ACCIDENT OR
LOSS
The following is added to Paragraph A.2.a., of
SECTION IV — BUSINESS AUTO CONDITIONS:

Your duty to give us or our authorized representa-
tive prompt notice of the "accident" or "loss" ap-
plies only when the "accident" or "loss" is known
to:
(a) You (if you are an individual);
(b) A partner (if you are a partnership);
(c) A member (if you are a limited liability com-
pany);
(d) An executive officer, director or insurance
manager (if you are a corporation or other or-
ganization); or
(e) Any "employee" authorized by you to give no-
tice of the "accident" or "loss".

M. BLANKET WAIVER OF SUBROGATION
The following replaces Paragraph A.5., Transfer
Of Rights Of Recovery Against Others To Us,
of SECTION IV — BUSINESS AUTO CONDI-
TIONS :

5. Transfer Of Rights Of Recovery Against
Others To Us
We waive any right of recovery we may have
against any person or organization to the ex-
tent required of you by a written contract
signed and executed prior to any "accident"
or "loss", provided that the "accident" or "loss"
arises out of operations contemplated by
© 2015 The Travelers Indemnity Company. All rights reserved.

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

Page 3 of 4 ends
Page 942 of 1100 ends

Policy Number: BA -1 N96406A-24-43-G
Effective Date: 07/01/2024

COMMERCIAL AUTO
such contract. The waiver applies only to the
person or organization designated in such
contract.

N. UNINTENTIONAL ERRORS OR OMISSIONS
The following is added to Paragraph B.2., Con-
cealment, Misrepresentation, Or Fraud, of
SECTION IV — BUSINESS AUTO CONDITIONS:

The unintentional omission of, or unintentional
error in, any information given by you shall not
prejudice your rights under this insurance. How-
ever this provision does not affect our right to col-
lect additional premium or exercise our right of
cancellation or non -renewal.

Page 4 of 4 ends

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

Page 943 of 1100 ends

CA T3 53 02 15

Policy Number: EPK148300
Term: 07/01/2024-07/01/2025
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

PRIMARY AND NON-CONTRIBUTORY ADDITIONAL INSURED

WITH WAIVER OF SUBROGATION
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART

CONTRACTORS POLLUTION LIABILITY COVERAGE PART

ERRORS AND OMISSIONS LIABILITY COVERAGE PART

THIRD PARTY POLLUTION LIABILITY COVERAGE PART

SCHEDULE
Name Of Additional Insured Person(s) or Organization(s) Blanket when specifically required in a written contract with the named insured.

A. SECTION III — WHO IS AN INSURED within the Common Provisions is amended to include as an additional insured the person(s) or organization(s) indicated in the Schedule shown above, but solely with respect to "claims" caused in whole or in part, by "your work" for that person or organization performed by you, or by those acting on your behalf.

This insurance shall be primary and non-contributory, but only in the event of a named insured's sole negligence.

B. We waive any right of recovery we may have against the person(s) or organization(s) indicated in the Schedule shown above because of payments we make for "damages" arising out of "your work" performed under a designated project or contract with that person(s) or organization(s).

C. This Endorsement does not reinstate or increase the Limits of Insurance applicable to any "claim" to which the coverage afforded by this Endorsement applies.

ALL OTHER TERMS AND CONDITIONS OF THE POLICY REMAIN UNCHANGED.

E N0118-0211

Page 944 of 1100 ends
Page 1 of 1 ends

TRAVELERS]

ONE TOWER SQUARE
HARTFORD CT 06183

WORKERS COMPENSATION
AND

EMPLOYERS LIABILITY POLICY
ENDORSEMENT WC 99 03 76 ( A) - 001
POLICY UB-7K72867624-43-G

WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS
ENDORSEMENT—CALIFORN
(BLANKET WAIVER)
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule.

The additional premium for this endorsement shall be 2. oo % of the California workers' compensation pre- mium.

Schedule
Person or Organization
ANY PERSON OR oRGANJ: ZATIO FOR

WHICH THE LNSORED RAS AGRHED
BY WRITTEN CONTRACT EXECU'I'Jro
PRIOR TO LOSS TO FURNJ:SH TRIS
WAIVER.

Job Description
This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated.
(The information below is required only when this endorsement is issued subsequent to preparation of the policy.)
Endorsement Effective Policy No. Endorsement No.

Insured Premium
Insurance Company
DATE OF ISSUE:07/01/2024 ST ASSIGN: Pagel oft

Page 945 of 1100 ends

October 2, 2024
Doug Story
Community Services Director

CITY OF BEAUMONT
550 E. 6th Street
Beaumont, CA 92223
Subject: Stewart Park Renovation Project NEPA Services Amendment No. 1 (Project Number:

BEAU -02.0)
Dear Doug,
PlaceWorks' recommends the following amendment to our original scope of work for the Stewart Park Renovation Project (project), in order for the City of Beaumont (City) to obtain the required environmental clearance pursuant to the National Environmental Policy Act (NEPA), and federal grant requirements of the National Park Services (NPS) Land and Water Conservation Fund (LWCF).

Understanding of NEPA Requirements
Under the direction of the City, PlaceWorks has prepared the Notice of Exemption (NOE) for the project pursuant to requirement of the California Environment Quality Act (CEQA). PlaceWorks understands that the City is seeking additional funding opportunities through the NPS LWCF for the park, which requires preparation of environmental documentation pursuant to NEPA. PlaceWorks believes that based on the location, size, land use, and programming anticipated for the project, and as analyzed under the NOE, and to be approved by the City in February 2024, the project would qualify for a Categorical Exclusion (CE), as outlined in the NPS NEPA Handbook (2015), 3.3 (F)(5) and Department of the Interior (DOI), Categorical Exclusions 43 CFR Part § 46.205. These requirements are summarized below and form the basis for our assumptions in this scope of work.

Part 516, Chapter 12: Managing the NEPA Process, 12.5 Categorical Exclusions Part F. Action Related to Grant Programs:
a. Grants for the construction of new facilities within an existing park or recreation area, provided that the facilities will not:
b. Conflict with adjacent ownerships or land use, or cause a nuisance to adjacent owners or occupants, e.g., extend use beyond daylight hours;
c. Introduce motorized recreation vehicles;
d. Introduce active recreation pursuits into a passive recreation area; e. Increase public use or introduce noncompatible uses to the extent of compromising the nature and character of the property or causing physical damage to it; or e. add or alter access to the park from the surrounding area.
700 S. Flower Street, Suite 600 1 Los Angeles, California 90017 1 213.623.1443 1 PlaceWorks.com

Page 946 of 1100 ends

PLACEWORKS
Scope of Work
PlaceWorks assumes that the environmental analysis will largely reference and incorporate the results of the NOE that will be approved by the City in February 2024, with the exception of Section 106 compliance regarding historic -era structures and archeological resources. PlaceWorks believes any additional analysis required to adhere to requirements pursuant to NEPA would be limited in scope and not require further technical, quantitative analysis (i.e., Air Quality or Noise assessment modeling).

In accordance with the original scope of work for CEQA services for the Project, PlaceWorks environmental team has completed Tasks 6.1 through 6.3 of the scope and is currently completing Task 6.4 (filing the NOE). As such, PlaceWorks recommends the following new Tasks to meet NEPA requirements:

TASK 6.5. PROJECT INITIATION
Virtual Meeting. PlaceWorks' Principal in Charge (PIC) Addie Farrell and Project Manager (PM) Jennifer Kelley will coordinate a virtual meeting with the City to further PlaceWorks' understanding of the NPS expectations for the NEPA process, the existing condition of the project site, and to discuss the environmental clearance schedule.

Project Description. PlaceWorks understands that minor adjustments to the Project Description, as presented in the NOE, may be necessary to describe the components of the project that would utilize NPS funding. Prior to conducting the environmental analyses, PlaceWorks will first prepare a Project Description to comply with the NPS funding requirements. The Project Description will summarize the project information, project location, description of the project, and define the Area of Potential Effect (APE) (Project Site). The Project Description will be submitted to the City for review and comment. This scope of work assumes one round of review for this task.

TASK 6.6. ENVIRONMENTAL ANALYSIS
Extraordinary Circumstances. Pursuant to DOI 43 CFR Part §46.215 (Extraordinary Circumstances), PlaceWorks will prepare the appropriate documentation and analyses to address topics (a) through (I) to determine if any extraordinary circumstances exist, which would prohibit the use of a CE for environmental clearance. For each topic identified, PlaceWorks will provide a full description of the determination and a synopsis of the information that it was based on, such as:
• Map panel numbers and dates
• Names of all consulted parties and relevant consultation dates • Names of plans or reports and relevant page numbers
• Any additional requirements specific to the program or region PlaceWorks will then submit the report to the City for review and address one round of consolidated comments and edits from the City.

Section 106 Cultural Resources Assessment Report. PlaceWorks understands the project is subject Section 106 pursuant to NEPA. Cogstone (serving as a subconsultant to PlaceWorks), will conduct a cultural resources assessment in compliance with Section 106 of the National Historic October 2, 2024 1 Page 2

Page 947 of 1100 ends

PLACEWORKS
Preservation Act (NHPA) under NEPA. Cogstone's scope includes a records search for known cultural resources, a Sacred Lands File search, an intensive pedestrian survey, assistance with section 106 consultation, including Tribal consultation and correspondence with the State Historic Preservation Office (SHPO), as well as the preparation of a Cultural Resources Assessment Report (Cultural Report). The Cultural Report will characterize the results of the records search, consultation efforts to determine baseline conditions, assess potential impacts to cultural resources resulting from the project, and make appropriate recommendations to avoid or minimize any potentially significant impacts. DPR 523 forms will be appended to the report. Cogstone will respond to two rounds of comments and prepare the final report.

TASK 6.7. PROJECT MANAGEMENT
Throughout the NEPA process, internal team management and coordination with the City will be necessary to ensure timely and consistent delivery of high -quality services. Project management responsibilities include task scheduling and assignment; management of resources; monitoring of costs and schedule adherence; consultation and coordination with local, state, and federal entities relative to the environmental review process; and coordination and communications with the City to ensure compliance with policies, procedures, and any applicable codes.

Assumptions. Though unanticipated, if our research finds impacts that prohibit the use of an CE pursuant to NEPA PlaceWorks will discuss options with the City, such as making changes to the project, preparing an Environmental Assessment (EA) Environmental Impact Statement (EIS), or supplementing our research with additional technical studies or reports. These other options, if required, would trigger a change in our scope and cost. This Amendment also assumes that attendance at in -person meetings and/or hearings is not required.

Proposed Schedule
The following schedule assumes a four -month timeline from project initiation to the end Table 1. Proposed Schedule
Task
Duration
Task 6.5 Project Initiation
Virtual Meeting
Project Description
Two Weeks
Task 6.6 Environmental Analysis
Extraordinary Circumstances Documentation (PlaceWorks)
Section 106 Cultural Resources Assessment Report (Cogstone) Four Weeks*
Three Months
Task 6.7 Management and Coordination
Duration of Project
(total estimate four months)
* PlaceWorks will prepare the environmental analysis concurrently with the Section 106 Cultural Resources Assessment Report.

October 2, 2024 Page 3

Page 948 of 1100 ends

PLACEWORKS
Cost Estimate
Our cost estimate is provided below in Table 2. Costs are billed on a time and materials basis with monthly invoices. The balance required to complete tasks associated with the Addendum is $38,765. This would bring the total contract value from $647,971 to $676,736 for an amendment of $28,765.

Table 2. Cost Estimate
Task
Cost
Task 6.5 Project Initiation
$3,249
Task 6.6 Environmental Analysis
Extraordinary Circumstances Documentation (PlaceWorks)
7,905
Section 106 Cultural Resources Assessment Report (Cogstone) 21,373
Task 6.7 Project Management
6,140
Reimbursable Expenses
98 AMENDMENT SUBTOTAL
38,765
Task 6 Environmental Review (Approximate Budget Remaining to be Applied) 10,000

AMENDMENT GRAND TOTAL
28,765
Authorization
This Amendment shall remain valid for a period of 90 days from the time of submittal. As a Principal, I am authorized to bind the team to the contents of this submittal and to negotiate contracts on behalf of PlaceWorks. If you have any questions regarding the contents of this proposal, please feel free to contact me at 213.623.1443 x2119 or via email at [email protected].

Respectfully submitted,

PLACEWORKS
.4/44.ee
Addie Farrell
Principal, Environmental Services

Page 949 of 1100 ends

October 2, 2024 1 Page 4

GZZ-I1

AGREEMENT FOR PROFESSIONAL SERVICES BY INDEPENDENT CONTRACTOR

THIS AGREEMENT FOR PROFESSIONAL SERVICES BY INDEPENDENT CONTRACTOR is made and effective as of the 5 day of 6c,e-I , 2022, by and between the CITY OF BEAUMONT ("CITY") whose address is 550 F. 6th Street, Beaumont, California 92223 and Placeworks, a California corporation whose address is 700 South Flower Street Suite 600. Los Angeles. California 90017 ("CONTRACTOR").

RECITALS
This Agreement is entered into on the basis of the following facts, understandings and intentions of the parties to this Agreement:

A. CITY desires to engage CONTRACTOR to provide landscape architecture and engineering services and construction documents for the Stewart Park Improvement Project; and
B. CONTRACTOR has made a proposal ("Proposal") to the CITY to provide such professional services, which Proposal is attached hereto as Exhibit "A"; and C. CONTRACTOR agrees to provide such services pursuant to, and in accordance with, the terms and conditions of this Agreement, and represents and warrants to CITY that CONTRACTOR possesses the necessary skills, licenses, certifications, qualifications, personnel and equipment to provide such services.

AGREEMENT
NOW, THEREFORE, in consideration of the foregoing Recitals and mutual covenants contained herein, CITY and CONTRACTOR agree as follows:

1. Term of Agreement. This Agreement is effective as of the date first above written and shall continue until terminated as provided for herein. Notwithstanding anything in this Agreement to the contrary, this Agreement shall automatically terminate after three (3) years unless extended by the parties with the approval of the City Council of the CITY.

2. Services to be Performed. CONTRACTOR agrees to provide the services ("Services") as follows: landscape architecture and enh!ineerina design services as provided in the Proposal and any related services which the City may request in writing. All Services shall be performed in the manner and according to the timeframe set forth in the Proposal.

CONTRACTOR designates Isabelle Minn as CONTRACTOR'S professional responsible for overseeing the Services provided by CONTRACTOR.

3. Associates and Subcontractors. CONTRACTOR may, at CONTRACTOR's sole cost and expense, employ such competent and qualified independent associates, subcontractors and consultants as CONTRACTOR deems necessary to perform the Services; provided, however, that CONTRACTOR shall not subcontract any of the Services without the written consent of

Page 1 of 10 ends
Page 950 of 1100 ends

CITY.

4. Compensation.

4.01 CONTRACTOR shall be paid at the rates set forth in the Proposal and shall not increase any rate without the prior written consent of the CITY. Notwithstanding anything in this Agreement to the contrary, total fees and charges paid by CITY to CONTRACTOR under this Agreement shall not exceed Six Hundred Forty Seven Thousand Nine Hundred Seven«, One dollars ($647.971).

4.02 CONTRACTOR shall not be compensated for any Services rendered nor reimbursed for any expenses incurred in excess of those authorized unless approved in advance by the CITY, in writing.

4.03 CONTRACTOR shall submit to CITY, on or before the fifteenth (15th) of each month, itemized invoices for the Services rendered in the previous month. The CITY shall not be obligated to pay any invoice that is submitted more than sixty (60) days after the due date of such invoice. CITY shall have the right to review and audit all invoices prior to or after payment to CONTRACTOR. This review and audit may include, but not be limited to CITY's:
a. Determination that any hourly fee charged is consistent with this Agreement's approved hourly rate schedule;
b. Determination that the multiplication of the hours billed times the approved rate schedule dollars is correct;
c. Determination that each item charged is the usual, customary, and reasonable charge for the particular item. If CITY determines an item charged is greater than usual, customary, or reasonable, or is duplicative, ambiguous, excessive, or inappropriate, CITY shall either return the bill to CONTRACTOR with a request for explanation or adjust the payment accordingly, and give notice to CONTRACTOR of the adjustment.

4.04 If the work is satisfactorily completed, CITY shall pay such invoice within thirty (30) days of its receipt. Should CITY dispute any portion of any invoice, CITY shall pay the undisputed portion within the time stated above, and at the same time advise CONTRACTOR in writing of the disputed portion.

5. Oblhzations of CONTRACTOR.

5.01 CONTRACTOR agrees to perform all Services in accordance with the terms and conditions of this Agreement and the Proposal. In the event that the terms of the Proposal shall conflict with the terms of this Agreement, or contain additional terms other than the Services to be rendered and the price for the Services, the terms of this Agreement shall govern and said additional or conflicting terms shall be of no force or effect.

5.02 Except as otherwise agreed by the parties, CONTRACTOR will supply all 2

Page 951 of 1100 ends

personnel, materials and equipment required to perform the Services. CONTRACTOR shall provide its own offices, telephones, vehicles and computers and set its own work hours. CONTRACTOR will determine the method, details, and means of performing the Services under this Agreement.

5.03 CONTRACTOR shall keep CITY informed as to the progress of the Services by means of regular and frequent consultations. Additionally, when requested by CITY, CONTRACTOR shall prepare written status reports.

5.04 CONTRACTOR is responsible for paying, when due, all income and other taxes, fees and withholding, including withholding state and federal taxes, social security, unemployment and worker's compensation, incurred as a result of the compensation paid under this Agreement. CONTRACTOR agrees to indemnify, defend and hold harmless CITY for any claims, costs, losses, fees, penalties, interest, or damages suffered by CITY resulting from CONTRACTOR's failure to comply with this provision.

5.05 In the event CONTRACTOR is required to prepare plans, drawings, specifications and/or estimates, the same shall be furnished in conformance with local, state and federal laws, rules and regulations.

5.06 CONTRACTOR represents that it possesses all required licenses necessary or applicable to the performance of Services under this Agreement and the Proposal and shall obtain and keep in full force and effect all permits and approvals required to perform the Services herein. In the event CITY is required to obtain an approval or permit from another governmental entity, CONTRACTOR shall provide all necessary supporting documents to be filed with such entity.

5.07 CONTRACTOR shall be solely responsible for obtaining Employment Eligibility Verification information from CONTRACTOR's employees, in compliance with the Immigration Reform and Control Act of 1986, Pub. L. 99-603 (8 U.S.C. 1324a), and shall ensure that CONTRACTOR's employees are eligible to work in the United States.

5.08 In the event that CONTRACTOR employs, contracts with, or otherwise utilizes any CalPers retirees in completing any of the Services performed hereunder, such instances shall be disclosed in advance to the CITY and shall be subject to the CITY's advance written approval.

5.09 Drug -free Workplace Certification. By signing this Agreement, the CONTRACTOR hereby certifies under penalty of perjury under the laws of the State of California that the CONTRACTOR will comply with the requirements of the Drug -Free Workplace Act of 1990 (Government Code, Section 8350 et seq.) and will provide a drug - free workplace.

5.10 CONTRACTOR shall comply with all applicable local, state and federal laws, rules, regulations, entitlements and/or permits applicable to, or governing the Services authorized hereunder.
3

Page 952 of 1100 ends

6. Insurance. CONTRACTOR hereby agrees to be solely responsible for the health and safety of its employees and agents in performing the Services under this Agreement and shall comply with all laws applicable to worker safety including but not limited to Cal -OSHA.

Therefore, throughout the duration of this Agreement, CONTRACTOR hereby covenants and agrees to maintain insurance in conformance with the requirements set forth below. If existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so. CONTRACTOR shall provide the following types and amounts of insurance:

6.01 Commercial general liability insurance in an amount of not less than $1,000,000 per occurrence and $2,000,000 in the aggregate; CONTRACTOR agrees to have its insurer endorse the general liability coverage required herein to include as additional insured's CITY, its officials, employees and agents. CONTRACTOR also agrees to require all contractors and subcontractors to provide the same coverage required under this Section 6.

6.02 Business Auto Coverage in an amount no less than $1 million per accident.

If CONTRACTOR or CONTRACTOR's employees will use personal autos in performance of the Services hereunder, CONTRACTOR shall provide evidence of personal auto liability coverage for each such person.

6.03 Workers' Compensation coverage for any of CONTRACTOR's employees that will be providing any Services hereunder. CONTRACTOR will have a state -approved policy form providing statutory benefits as required by California law. The provisions of any workers' compensation will not limit the obligations of CONTRACTOR under this Agreement. CONTRACTOR expressly agrees not to use any statutory immunity defenses under such laws with respect to CITY, its employees, officials and agents.

6.04 Optional Insurance Coverage. Choose and check one: Required _X_ /Not Required ; Errors and omissions insurance in a minimum amount of $2 million per occurrence to cover any negligent acts or omissions committed by CONTRACTOR, its employees and/or agents in the performance of any Services for CITY.

7. General Conditions pertaining to Insurance Coverae

7.01 No liability insurance coverage provided shall prohibit CONTRACTOR from waiving the right of subrogation prior to a loss. CONTRACTOR waives all rights of subrogation against CITY regardless of the applicability of insurance proceeds and shall require all contractors and subcontractors to do likewise.

7.02. Prior to beginning the Services under this Agreement, CONTRACTOR shall furnish CITY with certificates of insurance, endorsements, and upon request, complete copies of all policies, including complete copies of all endorsements. All copies of policies and endorsements shall show the signature of a person authorized by that insurer to bind coverage on its behalf.

7.03. All required policies shall be issued by a highly rated insurer with a minimum A.M. Best rating of "A:VII"). The insurer(s) shall be admitted and licensed to do business 4

Page 953 of 1100 ends

in California. The certificates of insurance hereunder shall state that coverage shall not be suspended, voided, canceled by either party, or reduced in coverage or in limits, except after thirty (30) days' prior written notice has been given to CITY.

7.04 Self-insurance does not comply with these insurance specifications.

CONTRACTOR acknowledges and agrees that that all insurance coverage required to be provided by CONTRACTOR or any subcontractor, shall apply first and on a primary, non- contributing basis in relation to any other insurance, indemnity or self-insurance available to CITY.

7.05 All coverage types and limits required are subject to approval, modification and additional requirements by CITY, as the need arises. CONTRACTOR shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect CITY's protection without CITY's prior written consent.

7.06 CONTRACTOR agrees to provide immediate notice to CITY of any claim or loss against CONTRACTOR or arising out of the Services performed under this Agreement. CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.

8. Indemnification.

8.01 CONTRACTOR and CITY agree that CITY, its employees, agents and officials should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys' fees, litigation costs, defense costs, court costs or any other costs arising out of or in any way related to the performance of this Agreement by CONTRACTOR or any subcontractor or agent of either. Accordingly, the provisions of this indemnity are intended by the parties to be interpreted and construed to provide the fullest protection possible under the law to CITY. CONTRACTOR acknowledges that CITY would not enter into this Agreement in the absence of the commitment of CONTRACTOR to indemnify and protect CITY as set forth herein. a. To the fullest extent permitted by law, CONTRACTOR shall defend, indemnify and hold harmless CITY, its employees, agents and officials, from any liability, claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses, damages or costs of any kind, whether actual, alleged or threatened, actual attorneys' fees incurred by CITY, court costs, interest, defense costs, including expert witness fees and any other costs or expenses of any kind whatsoever without restriction or limitation incurred in relation to, or to the extent arising out of or in any way attributable actually, allegedly or impliedly, in whole or in part to the negligent performance or willful misconduct of CONTRACTOR under this Agreement. CONTRACTOR's obligation to defend, indemnify and hold harmless shall include any and all claims, suits and proceedings in which CONTRACTOR (and/or CONTRACTOR's agents and/or employees) is alleged to be an employee of CITY. All obligations under this provision are to be paid by CONTRACTOR as they are incurred by CITY. 5

Page 954 of 1100 ends

b. Without affecting the rights of CITY under any provision of this Agreement or this Section, CONTRACTOR shall not be required to indemnify and hold harmless CITY as set forth above for liability attributable solely to the fault of CITY, provided such fault is determined by agreement between the parties or the findings of a court of competent jurisdiction.

9. Additional Services. Changes and Deletions.

9.01 In the event CONTRACTOR performs additional or different services than those described herein without the prior written approval of the City Manager and/or City Council of CITY, CON l'ItACTOR shall not be compensated for such services.

CONTRACTOR expressly waives any right to be compensated for services and materials not covered by the scope of this Agreement or authorized by the CITY in writing.

9.02 CONTRACTOR shall promptly advise the City Manager and Finance Director of CITY as soon as reasonably practicable upon gaining knowledge of a condition, event or accumulation of events which may affect the scope and/or cost of Services. All proposed changes, modifications, deletions and/or requests for additional services shall be reduced to writing for review and approval by the CITY and/or City Council.

10. Termination of Agreement.

10.01 Notwithstanding any other provision of this Agreement, CITY, at its sole option, may terminate this Agreement with or without cause, or for no cause, at any time by giving twenty (20) days' written notice to CONTRACTOR.

10.02 In the event of termination, the payment of monies due CONTRACTOR for undisputed Services performed prior to the effective date of such termination shall be paid within thirty (30) business days after receipt of an invoice as provided in this Agreement.

Immediately upon termination, CONTRACTOR agrees to promptly provide and deliver to CITY all original documents, reports, studies, plans, specifications and the like which are in the possession or control of CONTRACTOR and pertain to CITY.

11. Status of CONTRACTOR.

11.01 CONTRACTOR shall perform the Services in CONTRACTOR's own way as an independent contractor, and in pursuit of CONTRACTOR's independent calling, and not as an employee of CITY. However, CONTRACTOR shall regularly confer with CITY's City Manager as provided for in this Agreement.

11.02 CONTRACTOR agrees that it is not entitled to the rights and benefits afforded to CITY's employees, including disability or unemployment insurance, workers' compensation, retirement, CalPers, medical insurance, sick leave, or any other employment benefit. CONTRACTOR is responsible for providing, at its own expense, disability, unemployment, workers' compensation and other insurance, training, permits, and licenses for itself and its employees and subcontractors.
6

Page 955 of 1100 ends

11.03 CONTRACTOR hereby specifically represents and warrants to CITY that it possesses the qualifications and skills necessary to perform the Services under this Agreement in a competent, professional manner, without the advice or direction of CITY and that the Services to be rendered pursuant to this Agreement shall be performed in accordance with the standards customarily applicable to an experienced and competent professional rendering the same or similar services in the same geographic area where the CITY is located. Further, CONTRACTOR represents and warrants that the individual signing this Agreement on behalf of CONTRACTOR has the full authority to bind CONTRACTOR to this Agreement.

12. Ownership of Documents; Audit.

12.01 All draft and final reports, plans, drawings, studies, maps, photographs, specifications, data, notes, manuals, warranties and all other documents of any kind or nature prepared, developed or obtained by CONTRACTOR in connection with the performance of Services performed for the CITY shall become the sole property of CITY, and CON TRACTOR shall promptly deliver all such materials to CITY upon request. At the CITY's sole discretion, CONTRACTOR may be permitted to retain original documents, and furnish reproductions to CITY upon request, at no cost to CITY.

12.02 Subject to applicable federal and state laws, rules and regulations, CITY shall hold all intellectual property rights to any materials developed pursuant to this Agreement. CONTRACTOR shall not such use data or documents for purposes other than the performance of this Agreement, nor shall CONTRACTOR release, reproduce, distribute, publish, adapt for future use or any other purposes, or otherwise use, any data or other materials first produced in the performance of this Agreement, nor authorize others to do so, without the prior written consent of CITY.

12.03 CONTRACTOR shall retain and maintain, for a period not less than four years following termination of this Agreement, all time records, accounting records and vouchers and all other records with respect to all matters concerning Services performed, compensation paid and expenses reimbursed. At any time during normal business hours and as often as CITY may deem necessary, CONTRACTOR shall make available to CITY's agents for examination all of such records and shall permit CITY' s agents to audit, examine and reproduce such records.

13. Miscellaneous Provisions.

13.01 This Agreement, which includes all attached exhibits, supersedes any and all previous agreements, either oral or written, between the parties hereto with respect to the rendering of Services by CONTRACTOR for CITY and contains all of the covenants and agreements between the parties with respect to the rendering of such Services in any manner whatsoever. Any modification of this Agreement will be effective only if it is in writing signed by both parties.

13.02 CONTRACTOR shall not assign or otherwise transfer any rights or interest in this Agreement without the prior written consent of CITY. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or 7

Page 956 of 1100 ends

discharge the assignor from any duty or responsibility under this Agreement.

13.03 CONTRACTOR shall timely file FPPC Form 700 Conflict of Interest Statements with CITY if required by California law and/or the CITY' s conflict of interest policy.

13.04 If any legal action or proceeding, including an action for declaratory relief, is brought to enforce or interpret the provisions of this Agreement, the prevailing party will be entitled to reasonable attorneys' fees and costs, in addition to any other relief to which that party may be entitled.

13.05 This Agreement is made, entered into and shall be performed in the County of Riverside in the State of California and shall in all respects be interpreted, enforced and governed under the laws of the State of California.

13.06 CONTRACTOR covenants that neither it nor any officer or principal of its firm has any interest, nor shall they acquire any interest, either directly or indirectly, which will conflict in any manner or degree with the performance of their Services hereunder.

CONTRACTOR further covenants that in the performance of this Agreement, no person having such interest shall be employed by it as an officer, employee, agent, or subcontractor.

13.07 CONTRACTOR has read and is aware of the provisions of Section 1090 et seq. and Section 87100 et seq. of the Government Code relating to conflicts of interest of public officers and employees. CONTRACTOR agrees that they are unaware of any financial or economic interest of any public officer or employee of the CITY relating to this Agreement. It is further understood and agreed that if such a financial interest does exist at the inception of this Agreement, the CITY may immediately terminate this Agreement by giving notice thereof. CONTRACTOR shall comply with the requirements of Government Code section 87100 et seq. and section 1090 in the performance of and during the term of this Agreement.

13.08 Improper Consideration. CONTRACTOR shall not offer (either directly or through an intermediary) any improper consideration such as, but not limited to, cash, discounts, services, the provision of travel or entertainment, or any items of value to any officer, employee or agent of the CITY in. an attempt to secure favorable treatment regarding this Agreement or any contract awarded by CITY. The CITY, by notice, may immediately terminate this Agreement if it determines that any improper consideration as described in the preceding sentence was offered to any officer, employee or agent of the CITY with respect to the proposal and award process of this Agreement or any CITY contract. This prohibition shall apply to any amendment, extension or evaluation process once this Agreement or any CITY contract has been awarded. CONTRACTOR shall immediately report any attempt by any CITY officer, employee or agent to solicit (either directly or through an intermediary) improper consideration from CONTRACTOR. 8

Page 957 of 1100 ends

IN WITNESS WHEREOF, the parties hereby have made and executed this Agreement to be effective as of the day and year first above -written.

CITY:

CITY OF B
By:
oyd White, Mayor
CONTRACTOR:

Placeworks
By:

Print Name:

Title:
9

Page 958 of 1100 ends

EXHIBIT "A"

PROPOSAL

Page 959 of 1100 ends

Landscape
Architecture and
Engineering Design
Services and Construction
Documents for Stewart Park
Improvement Project

SCI* lki! ill t lfl tia
��lrt4�;l
4 ^F

PLACEWORKS
February 23, 2022
Kristine Day, Assistant City Manager
City of Beaumont
550 E. 6th Street
Beaumont, CA 92223
Re: Stewart Park Improvement Project
Dear Kristine:

Please accept the attached submittal as PlaceWorks' proposal to provide landscape architecture and engineering design services and construction documents for the Stewart Park Improvement Project for the City of Beaumont. The City has put together an exciting vision for the park and our team is enthusiastic about working with you to bring it to reality. This project requires an experienced team in public park renovation, recreational facility design, hydrological assessment, utility coordination, and environmental review to ensure that the project addresses the technical challenges, provides effective construction documents, and prepares the project for construction.

PlaceWorks is a full -service planning and design firm with expertise in park renovation. We have six offices throughout California with landscape architecture teams based in our Los Angeles, Santa Ana, and Berkeley offices. For this project, PlaceWorks will lead the team and serve as the primary designer for the project, as well as receive support from our in-house environmental staff.

As the frequent prime consultant on public park and open space projects, we have extensive experience leading multidisciplinary teams such as the one we have assembled for the Stewart Park project. Our team includes BKF Engineers to provide civil engineering, hydrological assessment, surveying, and property coordination; Ninyo & Moore to conduct the geotechnical assessment; PBS Engineers to develop electrical plans and assist with SCE coordination; Spire Structural to assist in structural engineering; and Sweeney +Associates to provide irrigation design. Our team is supported by two design specialists: PACE to develop the custom splash pad and California Skate Parks to design the skate park upgrade.

PLACEWORKS,COM • Orange County • Bay Area • Sacramento • Central Coast • Los Angeles • Inland Empire

Page 962 of 1100 ends

PLACEWORKS
This project requires an experienced team in park renovation and public project development to ensure that the City gets a project that is well -designed, within budget, and ready for construction. While much of our built work has been in Northern California, members of our core staff have recently relocated to Los Angeles to expand our practice area. This includes Jesse Jones, our proposed project manager for the Stewart Park Improvement Project. Jesse is a registered landscape architect and brings expertise in the design and construction of parks, playground, and streetscape projects.

Please do not hesitate to contact me if you need more information. The PlaceWorks team looks forward to working with you on this interesting and challenging project.

Sincerely,

PLACEWORKS
Isabelle Minn, ASLA, LEED AP
Principal
510.848.3815
[email protected]

Page 963 of 1100 ends

February 23, 2022 I Page 2

February 23, 2022 1 Proposal for Services
Landscape Architecture and
Engineering Design Services and
Construction Documents for
Stewart Park Improvement Project
for the City of Beaumont

PLACEWORKS
Submitted by: PlaceWorks
700 South Flower Street Suite 600
Los Angeles, California 90017
t 213.623.1443
In Association with:

BKF Engineers
Pace
Ninyo & Moore
PBS Engineers
Spire Structural
Sweeney & Associates
California Skate Parks
ORANGE COUNTY • BAY AREA • SACRAMENTO • CENTRAL COAST • LOS ANGELES • INLAND EMPIRE

Page 964 of 1100 ends

www.placeworks.com

Table of Contents
A. INTRODUCTION/INFORMATION 1
B. APPROACH 3
c. FIRM PROFILE 4

LOCATION INCLUDED IN SECTION A
D. ORGANIZATION, KEY PERSONNEL, AND RESUMES 7
Figure 1: Organization Chart 8
E. PROJECT EXPERIENCES 9
F. REFERENCES
G. SCOPE OF SERVICES
11 12
H. PROJECT SCHEDULE 20
Figure 2: Project Schedule 20

COST PROPOSAL UNDER SEPARATE COVER
APPENDIX No. 1: RESUMES
APPENDIX No. 2: PROJECT CUTSHEETS

Page 965 of 1100 ends

TABLE OF CONTENTS

A: Introduction
Renovating Stewart Park offers the opportunity to enhance a community asset. The park serves an important role as recreational destination, festival venue, and play space. Upgrades will ensure that it continues to serve the City of Beaumont's (City's) residents for many years into the future. The PlaceWorks team is excited to work with the City on this project and believes that we can use our talents to bring you an exceptional new open space.

Project Understanding
This project will pave the way for construction of the renovated Stewart Park with design drawings, permitting, and coordination with local utilities and agencies. The design team will expand on the conceptual plan and provide detailed strategies for delivering the proposed improvements, including a splash pad, playground, skate park, bandshell, gaga ball courts, picnic facilities, walking trails, restroom, parking area, park lighting, and planting. Based on our review of the request for proposals (RFP) and our experience on similar park renovation projects, we identified the following key considerations for the design team.

Provide a multi -functional setting that works for community -wide festivals and day-to-day use. Stewart Park is a community park in the heart of Beaumont. It will be used on a day-to-day basis by the general public, including families and kids from neighboring schools, and will host at least two large events annually. The design needs to create space that is comfortable and functional for single users, small groups, and the large crowds, providing easy navigation, durable materials, and an attractive setting. The site design must also consider climatic conditions in Beaumont and ensure that the final design provides adequate shade for hot summer months and uses a plant palette appropriate for the region.

Deliver exciting upgrades in a cost-effective way. The project requires both creativity in design and thoughtful consideration of improvement costs to ensure that the final designs are realistically estimated and buildable within the City's budget. Furthermore, low -maintenance strategies and durable materials will also be important to prioritize in the project design to limit the City's long-term maintenance costs. With current drought conditions, the plan should also prioritize low water use trees and plants to limit irrigation costs. We assume that prefabricated structures will be used for the new restroom and bandshell as a way of saving construction budget while allowing for customization to fit the project needs.

Offer a fun alternative to the swimming pool. The removal of the swimming pool took away a valuable aquatic experience at the park. A new splash pad will offer an opportunity to bring back a different but rich water -play activity space. The splash pad will provide an important space for children to cool off and play during the hottest times of the year and can be an interesting visual component to the park. A well -designed splash pad can be water - efficient and long-lasting.

Integrate with existing facilities and protect existing assets. While the renovation will bring in new facilities and important upgrades, it will be important to consider existing features and develop a plan that works seamlessly with the existing park features to create a cohesive park experience. The plan shall also seek to preserve important park features, such as mature trees around the perimeter of the park that can provide needed shade.

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Page 966 of 1100 ends

A. Introduction Ro ■ 1

Meet jurisdictional requirements and manage utility needs. As an existing park and roadway, the project must consider the needs of the utilities and agencies that pass through the space. In particular, the park must maintain functionality of the flood control basin and the project team must engage in strategic dialogue with Riverside County Flood Control and Water Conservation District (RCFC&WCD) to ensure that the project meets both the City's recreational needs and the District's hydrological ones. The project team must also facilitate water and electrical service for the project and coordinate directly with Beaumont Cherry Valley Water District (BCVWD) and Southem California Edison (SCE).

Scope Objectives
The scope of services for this project includes a full -service design and permitting process, including preliminary design, community engagement, utility coordination, construction documents, and environmental review. Our multi- disciplinary team will work collaboratively to effectively deliver a design that is buildable and well -coordinated with all stakeholders, agencies, and utilities.

Over years of managing complex projects with multiple subconsultants, PlaceWorks has developed effective strategies for guaranteeing that our work products are of the utmost quality, are completed within the agreed -upon time frame, and are aligned with the established budget. We work with our clients to develop complete critical path schedules in the initial project stages and establish meeting and deliverable due dates as early as possible, to allow everyone involved to monitor the project's progress. We schedule dates for deliverables for both our internal products and ones from our subconsultants to allow adequate time for internal review to ensure that each product we give our clients undergoes a thorough quality control assessment.

PlaceWorks maintains constant communication with our clients and subconsultants, and we document decisions in writing to make certain they are clearly understood by all team members.

Project Team
For this project, PlaceWorks will serve as the prime consultant, providing landscape architecture, serving as the primary contact with the City's project manager, presenting materials at meetings and leading community engagement, and producing the environmental document.

PlaceWorks staff will conduct work out of our Los Angeles and Santa Ana offices.

Our team is supported by subconsultants in the fields of civil engineering, structural engineering, electrical engineering, and design specialists for splash pads and skate parks. Together, our team brings over 30 years of expertise in crafting projects similar to the Stewart Park Improvement Project. Greater detail on our project team and our experience is provided in Chapters D and F.

PLACEWORKS
700 FLOWER STREET, SUITE 600
Los ANGELES, CA 90017
PRIMARY CONTACT AND PROJECT MANAGER:

JESSE JONES, RLA #6371
213 1 623.1443
[email protected]
2 ■■ A. Introduction & Location

Page 967 of 1100 ends

STEWART PARK IMPROVEMENT PROJECT

CRY OF BEAUMONT

: Approach
The PlaceWorks team brings the skills needed to successfully complete the Stewart Park Improvement Project and prepare the project to go out to bid. The following summary describes our approach. Our scope of services presented in Chapter I provides greater detail on the tasks presented in the RFP.

Detailed site analysis and evaluation of the existing concept. The project will begin with a detailed assessment of existing conditions with consideration for the proposed improvements. A survey and technical studies will provide a new level of detail and the foundation for a comprehensive site analysis. A qualitative assessment of the park will identify conditions that will impact visitor experience, such as areas with high sun or wind exposure and considerations will be made for protecting existing park assets and incorporating them into the updated site design. As part of this task, the design team will additionally consider the Concept Plan with focused attention on feasibility, costs, and compatibility between adjacent uses.

Integrated design. The PlaceWorks team will work collaboratively to develop a park plan that is functional, aesthetically pleasing, and unique to Beaumont. While PlaceWorks will lead the design efforts, specialists on the team will bring expertise to the splash pad and the skate park, and our team of engineers will ensure that the project functions effectively and site features are durable and up to code. PlaceWorks coordinates directly with all subconsultants and fosters a collaborative workflow to ensure that the project is delivered in a cohesive and integrated way.

Comparative Alternatives and Iterative Plan Review. The Schematic Design process will include developing design alternatives for delivering the proposed park improvements. The alternatives will be prepared to provide an equal experience in terms of park programming but vary in layout and design details.

These alternatives will present the City and the public, through the online survey, with options to consider before moving into design development. Once a preferred approach is determined, the PlaceWorks team will move through the design phases towards Final Construction Documents with regular check -ins with the City to ensure that the plan is progressing in a way that meets the needs of the project.

Focus on implementation. At all stages of the design process, the PlaceWorks team will consider project feasibility. All design products will be accompanied by a construction cost estimate and potential impacts to construction costs will be highlighted for the City. The PlaceWorks team will additionally coordinate with outside agencies and utilities to ensure that all plans are approved before Final Design. The project will include environmental review that will be tailored to the project. The PlaceWorks team will conduct parcel consolidation and utility easement work necessary to prepare for construction.

Communication. PlaceWorks trains effective project managers with the tools to communicate effectively with clients and stakeholders. Weekly progress meetings will be held to keep the project team up to date and involved in the project. Documentation with action items will ensure clear direction and avoid delays. Materials for public review, including the online survey, and meeting presentations will be reviewed by the City's project manager to ensure consistency with the project goals and City messaging. Presentation materials will be graphically rich and easy to understand. They will also be reviewed by internal staff for content and quality.

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Page 968 of 1100 ends

B. Approach I 3

. Firm Profile
PlaceWorks has assembled a highly qualified team to complete the Stewart Park Improvement Project. This chapter describes the firms on our team and areas of expertise.

PlaceWorks
PlaceWorks is one of the west's preeminent planning and design firms, with approximately 120 employees in six offices. Formerly known as The Planning CenterIDC&E, PlaceWorks' history dates back over 45 years. The Planning Center, established in 1975, was created with the intent to integrate individual design disciplines and work efforts into a greater whole. Similarly, Design, Community & Environment (DC&E) was founded over 20 years ago to offer high -quality, personalized, and comprehensive planning, design, and environmental review services. In 2011, these two highly respected planning and design firms merged, forming a company with an expanded set of disciplines and strengths.

PlaceWorks serves both public- and private -sector clients throughout the state in the fields of landscape architecture, urban design, comprehensive planning, environmental review, and community outreach. Our landscape architecture team brings diverse experience in planning and development of parks, playground and field renovations, design guidelines and streetscapes, and trails and open space facilities, as well as graphic design and interpretive signage.

PlaceWorks Strengths
The PlaceWorks team brings this specific expertise relevant to the Stewart Park Improvement Project.

Experience with Park Renovations. PlaceWorks has substantial experience with the evaluation, redesign, construction documentation, and construction administration of public parks in challenging urban environments. As much of our public sector work is retrofitting existing facilities, PlaceWorks is well -prepared to carefully analyze the existing site conditions and infrastructure and anticipate potential conflicts while also improving ADA access and universal design. A key element is a thorough site survey, verified with utility information and on -site analysis, which will ultimately save time and money throughout the life of the project.

From Vision to Reality. PlaceWorks has extensive experience transforming conceptual plans into working drawings for both projects where we lead the master plan process and for clients that bring their own vision. Our creative landscape architects work at all stages of the design process and move seamlessly between phases by understanding a project from initial concept to opening day.

Innovative Outdoor Environments. PlaceWorks works closely with staff, stakeholders, and the surrounding communities when developing park designs to envision and create outdoor environments that are flexible, engaging, unique, and inspiring. We seek opportunities to include interpretive and educational themes and components in our park designs.
4 NE C. Firm Profile

Page 969 of 1100 ends

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Realistic Phasing, Prioritization, and Cost Estimation. The design must be buildable, affordable, and maintainable within the City's established budgets and thresholds. PlaceWorks also has a solid track -record estimating project costs and navigating changes in the volatile bidding climate, particularly during the COVID pandemic. We work with our engineers and industry experts to follow trends in material costs to avoid project delays and necessary redesign to address bids above the project budget.

Sustainability and Water Conservation. PlaceWorks is a leader in the field of sustainable planning and design and has worked closely with many agencies and organizations, including Build it Green, and the California Urban Water Conservation Council to develop guidelines, design templates, and maintenance manuals that address water conservation, stormwater management, and high -efficiency irrigation.

Award -winning Community Engagement. PlaceWorks embraces community -based design and is a leader in public engagement. PlaceWorks has won numerous awards for our outreach practice. We create and carry out a broad range of public engagement strategies that are customized to meet the needs of the client, the budget, and the project, including customized online outreach. Our online surveys are easy to implement and easy to use and can be readily developed for the Stewart Park Improvement Project.

In -House Environmental Review. PlaceWorks is one of the few Califomia firms that completes award -winning designs and plans, as well as comprehensive California Environmental Quality Act (CEQA) documents, in-house.

Our planners and designers are highly familiar with CEQA, permitting, and regulatory processes, which allows us to develop designs that minimize impacts and reduce costs for our clients.

BKF
Since 1915, BKF Engineers earned a reputation for its ability to successfully plan, design, survey, and implement complex projects. BKF's decades of engineering, surveying, and planning experience is evident in our legacy projects throughout the west coast. By leveraging our diverse project portfolio in combination with innovative design solutions, BKF's team of more than 450 experienced staff is dedicated to successfully delivering sustainable and dynamic projects for our communities and partners. BKF Engineers will assist PlaceWorks in providing Civil Engineering & Surveying services. We will conduct a site survey, assist with construction drawings (erosion control, demolition, grading and drainage, and utility plans and details), and do construction administration on civil items.

Ninyo & Moore
Ninyo & Moore, a California Corporation, is a minority -owned, multidisciplinary consulting firm that provides high - quality geotechnical and environmental consulting services. The firm was incorporated in 1986 to provide consulting services in geotechnical engineering, construction inspection and testing, engineering geology, hydrogeology, hazardous waste remediation and environmental assessment. Ninyo & Moore will support the PlaceWorks team in determining the locations of our exploratory borings and infiltration tests based on, the preferred park improvement concept plan, and will provide project oversight during the field work, laboratory testing, geotechnical engineering analysis, and preparation of our geotechnical evaluation report.

STEWART PARK IMPROVEMENT PROJECT

CRY OF MANTECA

Page 970 of 1100 ends

C. Firm Profile NS
5 PBS Engineers
PBS was established in 1982 as a Portland -based professional services firm dedicated to assisting the public and private sectors with health and safety and environmental issues. Since that time, our firm has expanded through multiple offices across the Pacific Northwest offering a wide range of engineering, environmental, health and safety, and surveying services.

PACE
Pacific Advanced Civil Engineering, Inc. (PACE) is a specialized civil engineering firm formed in 1987 offering advanced water resource services. PACE offers a wide range of engineering services related to water, wastewater, stormwater management, and water resource permitting and regulatory compliance to ensure projects are both economically viable and environmentally sustainable. Our engineering approach focuses on maximizing value by creating multi -use infrastructure systems, cost-effective phasing strategies and systems that include environmental, aesthetic, and recreation uses.

Spire Structural
Spire Structural Engineering Inc. was established in 2005 to provide structural engineering analysis and design of many types of new and existing structures using all materials. Spire's staff is determined to provide its clients with designs that consider cost, ease of construction, and cutting -edge construction methods to meet the objectives of each project.

Sweeney & Associates
Sweeney & Associates, Inc. is an irrigation consulting firm specializing in irrigation system design, master planning, and water management. Founded in 1990, in San Diego, California, the company has evolved into an internationally recognized leader in the irrigation industry. Sweeney & Associates provides irrigation design services to a wide variety of clientele, including landscape architects, engineering firms, and municipalities. The company is recognized as a leader in the drip and subsurface irrigation design field.

California Skateparks
California Skateparks (CSP) is a full -service design/build company specializing in the development of public and private environments for skateboarding throughout the United States and around the world. Founded by Joe Ciaglia in 1990, California Skateparks has created a diverse range of public and private skateparks, plazas, skate spots, bowls, and landscape projects. These places have not only increased opportunities for skateboarding and other action sports, but they have contributed to the recreational and social fabric of the communities in which they are located.
6 RN C. Firm Profile

Page 971 of 1100 ends

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

D: Organization, Key Personnel, and Resumes
This chapter describes the key PlaceWorks personnel who will manage the Stewart Park Improvement Project. The full organization of the team is shown graphically in Figure 1. Resumes for all key staff assigned to this project are included Appendix No. 1.

PlaceWorks
Isabelle Minn, ASLA, LEED AP, Principal, will serve as Principal -in -Charge and will ensure that all products are produced on time, on budget, and meet the highest standards of quality. Additionally, she/he will be available to facilitate public workshops and critical meetings throughout the process. Isabelle has more than two decades of experience in community -based design and planning. Her work has focused on landscape architecture and urban design, with an emphasis on the protection of open space and natural resources, as well as on improving and greening our urban areas. She has managed a wide range of projects from large, open space master plans to urban forestry plans and site planning and design. She strives to create a balance between protecting resources and increasing public access.

Isabelle has developed multidisciplinary studies addressing physical, biological, cultural, and policy issues that affect watersheds. She has also managed many trail planning and design projects, from large-scale trail master plans to construction documents, and she is an expert on the development of urban greening projects. Isabelle is currently overseeing PlaceWorks' efforts on the Reimagining Big Basin project, the Folsom Lake SRA Road and Trail Management Plan, and the East Mountain Tampalpais State Park Facilities Management Plan. Isabelle is fluent in Spanish and frequently facilitates in Spanish as part of park planning and design work at PlaceWorks.

Jesse Jones, ASLA, Senior Associate, will serve as the Project Manager and will be responsible for the day-to-day management of the project, as well as for maintaining regular contact with City staff, coordinating with subconsultants, facilitating workshops, and attending all project meetings. Jesse brings to every project a broad range of experience in landscape design and environmental analysis. Her areas of focus include landscape infrastructure, including low -impact design interventions; school gardens and outdoor learning environments; shoreline parks; and trail planning and design. As a landscape architect at PlaceWorks, Jesse provides research and design services, including construction documentation, conceptual design, and graphic production for a variety of project types.

Jesse relocated from our Bay Area office to Los Angeles in 2021 and brings a wealth of experience in park construction to her new home. She continues to manage projects in both Northern and Southern California, including the Richmond Wellness Trail, which is currently under construction, and the Capistrano Beach Park Master Plan. Jesse served as project. manager or key project staff on all of the PlaceWorks projects presented in this proposal. She leads multi -disciplinary teams on nearly every project and strives for that perfect balance of highly functional and exceptionally beautiful.

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Page 972 of 1100 ends

FIGURE 1 ORGANIZATIONAL CHART

CITY OF BEAUMONT
Department of Parks and Recreation
Department of Public Works

PLACEWORKS
Project Management, Landscape Architecture, Public Engagement, Environmental Review Isabelle Minn, RLA #5248, LEED AP, Principal -in -Charge Jesse Jones, RLA #6371, Senior Associate, Project Manager Jenn Chung, Associate Designer, Landscape Architecture
Yue Zhang, Associate Designer, Landscape Architecture
Logan Woodruff, Associate Designer, Landscape Architecture Addle Farrell, Principal, Environmental

BKF ENGINEERS
Civil Engineering
Bruce Kirby, PE, QSD/QSP, Associate
Davis Thresh, PLS

NINYO & MOORE
Geotechnical Engineering
Michael Putt, PG, CEG, Principal Geologist

SPIRE STRUCTURAL
Structural Engineering
Alexandros G. Bletsos, SE, Principal
Jeremy C. Welton, SE Principal
Splash Pad Design
Zirang Song, MS, PE, Vice President / Recreational Water Division Manager

PBS ENGINEERS
Electrical Engineering
Kunal Shah, PE, RCDD, LEED AP, Tariq Hassan, PE,
Louis (Lou) Perez, Gregory Morrison, Ronald (Ron) Martinez

SWEENEY & ASSOCIATES
Irrigation
Daniel L. Zummallen, Vice President

CALIFORNIA SKATE PARKS
Skate Park Design
Zachary Wormhoudt, RLA #4305, Principal
8 Ow E. Project Experience

Page 973 of 1100 ends

STEWART PARK IMPROVEMENT PROJECT

CRY OF BEAUMONT

Project Experiences
This chapter provides a list of projects related to the scope of work that PlaceWorks has completed within the past five years. Please see Appendix No. 2 for images and additional projects from the PlaceWorks team.

PlaceWorks
Snow Park Renovation for the City of Oakland. PlaceWorks worked with the City of Oakland to develop a comprehensive urban greening retrofit along Oakland's iconic Lake Merritt. Snow Park was redesigned to include new features were added to meet the needs of the local community. These include a new state-of-the-art terraced play area and a pedestrian promenade, with a highly visible rain garden featuring a custom art piece by local artists WowHaus. The sculpture represents a mythical water -dwelling creature that connects the site's location near the lake and the rainwater elements in the park. PlaceWorks designed the space to highlight the sculpture and bring people into the heart of the park. The project also included a new pedestrian- and bicycle -friendly multimodal corridor connection along the lake. The project included permeable and high-albedo paving, native and climate adapted plantings, and high recycled content in all purchased materials.

PlaceWorks also provided outreach and coordination with the community and multiple advisory committees to create conceptual plans for the park, streetscape, and lakeside improvements. The plans were developed into construction documents that included specific enhancements for roadways, electrical systems, street lighting, and stormwater infrastructure, including ample rain gardens. PlaceWorks' role on this project included environmental review under CEQA and National Environmental Policy Act (NEPA). PlaceWorks also provided construction administration.

PROJECT HIGHLIGHTS
✓ Multi -level playground
Award winning park
renovation project
✓ Innovative stormwater
management
Jean Sweeney Open Space Park for the City of Alameda.

PlaceWorks prepared design development and construction documents for this unique 27 -acre community park in the heart of Alameda. The design process built upon a masterplan developed by the City with input from residents. PlaceWorks conducted community outreach with residents and stakeholders to ensure that the final project fulfilled their vision for the site. A phasing plan was developed separating construction and bidding of the park into four phases. The

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Page 974 of 1100 ends

E. Project Experience a II
9 first phase of construction includes the Cross -Alameda Trail, a shaded Class I bike trail which runs along the northern edge of the park.

The second phase of construction includes the eastern end of the Park, with a large nature playground, great lawn, picnic pavilion, parking lot and stormwater treatment planting. The park incorporates elements from the site's previous use by the Beltline Railway, including a historic train shelter and interpretive signage about Jean Sweeney's legacy as an open space advocate. The nature play area incorporates natural elements, such as boulders and logs repurposed from City tree maintenance, with playground equipment to create a unique and memorable play experience for both young children and older youth.

The third and fourth phases of the park will expand the park by adding, a large community garden, demonstration orchards, a bicycle skills course, habitat planting areas, and hiking trails with ongoing opportunities for outdoor education and nature -watching.

PROJECT HIGHLIGHTS
Prefabricated gathering
pavilion and rest stops
Large playground with water
features
✓ Integrated trail and bike path
Iris Chang Park for the City of San Jose. PlaceWorks provided master planning, landscape architectural design, and construction documents for a new 2.5 -acre memorial sculpture park in North San Jose.

PlaceWorks' CEQA staff completed the Initial Study/Negative Declaration necessary for the project. The park is named after Iris Chang, a Chinese-American journalist and author, who wrote the bestselling book, The Rape of Nanking, which covered atrocities committed in China by the Japanese army, a forgotten holocaust of the Second World War.

PlaceWorks worked closely with the community as well as with Ms.

Chang's parents in shaping the vision for the park, which includes a series of monumental stone sculptures created by the artist Richard Deutsch.

The site is located adjacent to Coyote Creek Trail and the new path system includes an accessible trail connection from the park and its neighborhoods up to the trail, which runs along the top of a levee.

The grading required to bring users from ground level to the trail provided inspiration for exuberant curves in path layout and in earthform, allowing the landscape to have a sculptural form of its own.

The park design includes a dynamic planting plan made up of grasses of various textures and sizes arranged in concentric and undulating waves. These textures and forms, combined with the stone sculptures, create a contemplative environment for visitors to consider Iris Chang's legacy.

PROJECT HIGHLIGHTS
✓ Collaboration with local artist
Multiuse lawn and Drought
Tolerant Planting
Flood Control District
Coordination
10 lull E. Project Experience

Page 975 of 1100 ends

STEWART PARK IMPROVEMENT PROJECT

CRY OF BEAUMONT

References
PlaceWorks has provided references from clients who can attest to the quality of the work we do. We encourage you to contact them to find out more about our project work.

Clement Lau, Departmental Facilities Planner
County of Los Angeles
1000 S. Fremont Ave, Unit #40, Building A-9 West, 3rd Floor Alhambra, CA 91803 1 626.588.5301
626-588-5301
Dates of work: 2013-2015, 2016-2019, 2020
Description of services: multiple projects including community parks plans, street level renderings for public works improvements, and community engagement
Annie Youngerman, Project Manager
The Trust for Public Land
101 Montgomery Street., Suite 1000
San Francisco, CA 94104
415-800-5201
Dates of work: September 2019 — June 2021
Description of services: conceptual design, construction drawings, and construction administration of Markham Elementary School in Oakland, CA.

Han -Lei Wang, Landscape Architect
City of San Jose
Public Works, CFAS
200 East Santa Clara Street, 6th Floor
San Jose, CA 95113
408-535-8356
Dates of work: June 2018 — May 2019
Description of services: construction drawings and construction administration for Iris Chang Park in San Jose, CA.

Barney Matsumoto, Landscape Architect
California State Parks, Southern Service Center
2797 Truxtun Rd
San Diego, CA 92106
619.221.7070
Dates of work: on -going
Description of services: various projects as on -call park planners for California State Parks

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Page 976 of 1100 ends

F. References O ■ 11

G: Scope of Services
Task I. Project Initiation and Project Management

1.1 City Staff Meeting 1: Kickoff Meeting and Site Visit The PlaceWorks team will attend a kick-off meeting with City staff to discuss expectations and concems, and to review key issues, information needs, work products, and delivery schedule. Overall project schedule and meeting dates will be reviewed. After the kick-off meeting, the PlaceWorks team will visit and photograph Stewart Park, paying particular attention to features and issues identified at the kick-off meeting and areas with proposed improvements in the Concept Plan.

1.2 Ongoing Project Management
PlaceWorks will coordinate with City staff throughout the project and will manage the scope, cost, and schedule to ensure that the project is completed efficiently. PlaceWorks will conduct weekly calls with the City project manager to coordinate. Additional meetings with the City Staff related to project review are called out in the tasks below.

Task 2. Data Gathering and Site Analysis

2.1 Survey
BKF Engineers (BKF) will provide boundary and topographic surveying of the project site. The topographic survey will cover the project area and will extend to include the full width of adjacent rights -of -way. Spot elevations will be sufficient to generate 0.5 foot contours and existing easements, assessor parcel numbers, and existing utilities on or adjacent to the proposed project area will be shown. Potholing will be conducted to confirm existing utilities.

2.2 Preliminary Title Reports, Street ROW Vacation, and Parcel Merger BKF will obtain the preliminary title report on all project parcels. BKF will additionally work with the City to finalize documentation necessary for formally close 9th and 10th Street and to merge the entire project area into one parcel.

BKF will document and record the final boundary survey and provide it to the City.

2.3 Geotechnical Investigation
Ninyo & Moore will develop a geotechnical investigation report for the proposed project. The study will incorporate the existing information from the June 2021 study and will include a geologic reconnaissance of the site to evaluate existing conditions. Ninyo & Moore will also conduct up to five (5) small diameter borings ranging from 20 to 30 feet deep and two additional shallow borings to a depth of approximately 5 feet to perform infiltration tests. Borings will be in areas where new facilities are proposed, including the restroom, bandshell, splash pad, playground, and parking lots. Laboratory tests will be conducted on the subgrade materials, and a letter report will be prepared containing the following: a site plan showing boring locations, logs of the borings, laboratory test data, a description of the geotechnical site conditions, site class and related seismic design parameters per the 2019 California 12 o ■ G. Scope of Services

Page 977 of 1100 ends

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Building Code, earthwork recommendations for subgrade preparation of pavements and structures, and foundation recommendations for a restroom, bandshell, and splash pad slab.

2.4 Hydrological Assessment
BKF will conduct a hydrological assessment of the existing park and area feeding the Riverside County Flood Control and Water Conservation District (RCFC&WCD) flood control basin. The assessment will include current flood capacity and analyze flood events, including the 100 -year storm event. Following the development of the 30% design drawings, BKF will assess the impacts of any proposed improvements to the capacity and function of the flood control basin. These studies will be used in discussion with RCFC&WCD described in Task 5.

2.5 Site Analysis and Concept Review
Based on site visits, review of background information, and the hydrological assessment, PlaceWorks will develop a comprehensive Site Analysis including descriptive maps, diagrams, and graphics to clarify and illustrate existing conditions and identify key opportunities and constraints to be considered. The PlaceWorks team will additionally analyze the City's Concept Plan to determine feasibility and consistency with site opportunities and constraints.

2.6 City Staff Meeting 2: Site Analysis and Design Considerations PlaceWorks will facilitate a meeting with City staff to review and discuss the Site Analysis and considerations for the Concept Plan. The project team will confirm the direction for the preliminary design.

Task 3. Preliminary Design and Community Engagement

3.1 Schematic Design
The PlaceWorks team will develop up to two alternative conceptual site designs for Stewart Park. The alternatives will include graphic plans, material palettes, street level renderings, and other graphics to help convey design intent.

Conceptual site designs will include, but not be limited to:
• Walking trail alignments and public access
• New use areas, including new splash pad, playground, gaga courts, and bandshell ▪ Prefabricated structure styles
▪ Upgraded skate park features
▪ Site fumishings, including benches, picnic pavilions, and BBQs • Plant palette
Traffic circulation and flow
Both alternatives will be accompanied by a high-level cost estimate and both will target the same budget.

3.2 City Staff Meeting 3: Schematic Design
PlaceWorks will facilitate a meeting with City staff to review the Schematic Design Alternatives and potential changes to the options before presenting them in the online forum. The project team will also review the draft online survey tool and discuss strategies for gathering responses.

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Page 978 of 1100 ends

G. Scope of Services • ■ 13

3.3 Online Survey
PlaceWorks will develop and host and online survey to gather feedback on the Schematic Design Alternatives. The survey will target getting feedback about site features rather than directly voting for one alternative, allowing the final design to be a combination of preferred elements. Following the completion of the survey, PlaceWorks will provide a concise summary of responses and recommendations for moving forward.

3.4 City Council Meeting 1: Schematic Design
In partnership with City staff, PlaceWorks will present the Schematic Design Altematives and results from the online survey to City Council. The presentation will include a summary of the preferred approach to move forward for design development but will allow for feedback and recommendations from City Council members.

3.5 Draft Design Development
Based on discussions with City staff, community feedback from the online survey, and comments from City Council, the PlaceWorks team will develop a single preferred design option, including a rendered site plan graphic with callouts identifying the project components with a written description, sections showing relationship between park elements, and street level renderings of site features.

The draft plan will be accompanied by a lighting analysis showing existing illumination in the park and a proposed lighting strategy based on the proposed plan. The draft plan will also include a preliminary planting plan with hydrozones identified and preliminary water use calculations determined. The design will be accompanied by a draft cost estimate.

3.6 City Staff Meeting 4: Design Development
PlaceWorks will facilitate a City staff meeting to discuss the Draft Design Development Plan and solicit review comments and edits. The project team will also prepare for the final presentation to City Council.

3.7 Revised Design Development (30 -Percent Drawing and Cost Estimate) Based on City review comments, the PlaceWorks team will revise the Draft Design Development Plan. This draft will serve as the basis for the CEQA project description and will be used in discussions and for preliminary letters of intent with RCFC&WCD, Southern California Edison (SCE), and Beaumont Cherry Valley Water District (BCVWD).

The revised Design Development package will include preliminary working drawings to 30 percent and will be accompanied by a cost estimate. The package will include the following preliminary plan sheets:
• Title Sheet and Location Map
• Demolition Plan
• Grading, Drainage, and Utility Plan
• Layout Plan
• Materials Plan
• Electrical Plan
• Planting Plan and Hydrozone Irrigation Calculations
14 a ■ G. Scope of Services

Page 979 of 1100 ends

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Specifications will be in CSI format. A table of contents will be provided with the 30% set indicating section to be included in subsequent submittals.

3.8 City Council Meeting 2: Design Development
In partnership with City staff, PlaceWorks will present the Revised Design Development package to City Council.

The presentation will focus on the changes to the project based on feedback from City staff, the public, and City Council.

3.9 City Staff Meeting 5 and Field Review: Preparing for Final Design PlaceWorks will facilitate a City staff meeting to review the 30% drawings and conduct a site walk with to review the drawings in the field and deliberate on areas where there are questions or potential impacts.

Task 4. Construction Documents

4.1 60 -Percent PS+E Submittal
Based on the City's Comments and the Field Walk to review the Design Development plan, the PlaceWorks team will develop the 60 -percent PSE submittal for the project. The preliminary list and count of the construction document sheet set is anticipated to include approximately 48 to 50 sheets and is listed in Table 1. We believe for the purpose of clarity that construction document plans are best prepared at 1:20 scale.

The construction document set is anticipated to include:

TABLE 1 PRELIMINARY CONSTRUCTION DOCUMENT SHEETS (60% 90%, 100%, FINAL SET) Sheet Title
Responsibility
Sheets
Title Sheet and Location Map
PlaceWorks
1 Notes, Legend and Abbreviations
PlaceWorks
1 Existing Conditions /BASE @ 1:20
BKF
4 Water Quality Management Plan (WQMP) BKF
4 Storm Water Pollution Prevention Plan (SWPPP) BKF
4 Storm Drainage Hydrology/Hydraulic Report
BKF 4
Demolition Plans @ 1:20
BKF 4
Civil Construction Details
BKF 3
Grading & Drainage Plans @1:20
BKF 4
Site Improvements/Horizontal Control Plans @1:20
BKF 4
Sewer and Water (wet) Utility Plans
BKF 4
Materials Plan @1:20
PlaceWorks 4
Landscape Details
PlaceWorks 6

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Page 980 of 1100 ends

G. Scope of Services ■ ■ 15

TABLE 1 PRELIMINARY CONSTRUCTION DOCUMENT SHEETS (60% 90%, 100%, FINAL SET) Sheet Title
Responsibility
Sheets
Electrical Plans @1:20
PBS Engineers
4 Electrical Details
PBS Engineers
4 Splash Pad Plans @1:10
Pace
1 Splash Pad Details
Pace
4 Skate Park Plans @1:10
California Skate Parks 1
Skate Park Details
Structural Plans
Structural Calculations
California Skate Parks
Spire Structural
Spire Structural
2 3
1 Irrigation Plans @1:20
WELO Calcs & Submittals
Sweeney + Associates 4
Irrigation Details
Sweeney + Associates 2
Planting Plan @1:20
PlaceWorks 4
Irrigation Details
Sweeney + Associates 2
Planting Details
PlaceWorks 2
The 60 -percent plans will be accompanied by draft specifications in CSI format. The cost estimate will be developed using the City's preferred schedule of values format or other bid form ready template.

4.2 City Staff Meeting 6 and Field Review: 60 -Percent PS+E Following a three-week review period, City staff will provide PlaceWorks with one set of marked up plans and specifications. PlaceWorks will meet with City staff to review comments on the 60% set and clarify any questions that may arise. The project team will conduct a site walk to address any remaining issues.

4.3 90 -Percent PS+E Submittal
Based on City review comments, the PlaceWorks team will revise the 60 -percent submittal and refine it to 90 percent.

4.4 City Staff Meeting 7: 90 -Percent PS+E Submittal
Following a three-week review period and receipt of marked up plans and specifications, PlaceWorks will meet with City staff to review comments on the 60 -percent set and clarify any questions that may arise.

4.5 100 -Percent PS+E Submittal
Based on City review comments, the PlaceWorks team will revise the 90 -percent submittal and refine it to 100 percent.
16 P ■ G. Scope of Services

Page 981 of 1100 ends

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

4.6 City Staff Meeting 8: 100 -percent PS+E Submittal
Following a three-week review period and receipt of marked up plans and specifications, PlaceWorks will meet with City staff to review comments on the 90 -percent set and clarify any questions that may arise.

4.7 Final PS+E (Bid Set)
Based on City's review comments, PlaceWorks will make minor revisions to the 100% submittal and refine it to a Final set for going to bid purposes. The Final plan set will include the electrical plan of service approved by SCE and final plan of service approved by BCVWD.

Task 5. Coordination and Permitting
Throughout the design process, the PlaceWorks team will coordinate with local utilities and jurisdictional agencies.

5.1 Southern California Edison (SCE)
PBS Engineers will coordinate with SCE early in the design process to determine electrical capacity requirements and service needs. In tandem with the 30 -percent submittal, PBS Engineers will submit a Letter of Intent to begin the process for SCE electrical plan of service and all permits. PBS Engineers will update plans as needed to respond to SCE's request and will finalize the plan of service and all associated permits as part of this project. It is assumed that the City will pay an associated permitting fees.

BKF will coordinate with SCE regarding any necessary easements for electrical lines located within the sections of 9th or 10th Streets that will be vacated and consolidated into the park parcel.

5.2 Beaumont Cherry Valley Water District (BCVWD)
BKF will coordinate early in the design process BCVWD to verify available water pressures and volumes and to determine water service needs and capacity requirements. In tandem with the 30 -percent submittal, BKF will provide additional detail about the project including water needs for the splash pad, restroom, and irrigation and initiate the BCVWD service plan process. BKF will finalize the plan of service and include it as part of the final construction documents.

BKF will additionally coordinate with BCVWD regarding any necessary easements for water lines located within the sections of 9th or 10th Streets that will be vacated and consolidated into the park parcel.

5.3 Riverside County Flood Control and Water Conservation District (RCFC&WCD) BKF will coordinate with RCFC&WCD as part of the Hydrological Assessment described in Task 2. In tandem with the 30 -percent submittal, BKF will submit the plans to RCFC&WCD for review and comment. BKF will incorporate any plan edits from RCFC&WCD and will coordinate the application and approval of any required permits. It is assumed that the City will pay an associated permitting fees

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Page 982 of 1100 ends

G. Scope of Services • ■ 17

5.4 Other Utilities (Gas, Telephone, Cable)
In addition to coordinating the easements for SCE and BCVWD, BKF will reach out to other utilities to determine necessary easements for utility lines located within the sections of 9th or 10th Streets that will be vacated and consolidated into the park parcel.

5.5 Riverside County Department of Public Health
Pace will coordinate with Riverside County Department of Public Health to issue a permit for the splash pad.

Task 6. Environmental Review
The following scope outlines the process for completing environmental analysis that will inform the appropriate tiered CEQA document, and the CEQA document.

6.1 Initial Study
PlaceWorks will prepare a detailed Initial Study that will inform the appropriate CEQA document (described below).

The Initial Study will include a project description that includes the project -specific details and information to support all the conclusions stemming from the threshold questions in Appendix G, Environmental Checklist, of the CEQA Guidelines. The Initial Study will determine if any environmental impacts are anticipated due to construction and operation of the project and include mitigation measures if required. The Initial Study will assess environmental impacts that could result from the construction and operation of the proposed project. The Initial Study will document the resulting level of significance for each of the topical areas required under CEQA.

6.2 CEQA Document
Assuming that the Initial Study finds that there are no unavoidable significant environmental impacts as a result of the project, PlaceWorks can prepare one of the following documents as CEQA permits and the City desires. • If all impacts are considered to be less than significant without mitigation, PlaceWorks can prepare a Notice of Exemption.
• If all of the impacts are considered to be less than significant with application of the mitigation measures identified in the recently certified General Plan EIR (2020, State Clearinghouse Number 2018031022), PlaceWorks can prepare an Addendum to the General Plan EIR. • If some of the impacts require new mitigation beyond those included in the General Plan EIR to determine a less -than -significant conclusion, PlaceWorks can prepare a Mitigated Negative Declaration (MND).

However, if it is determined that proposed project could result in a significant and unavoidable impact PlaceWorks can prepare a Focused EIR with the City's approval of a contract amendment.

PlaceWorks will prepare a mitigation monitoring or reporting program (MMRP) to accompany the CEQA document, if mitigation measures are required. If the appropriate and preferred CEQA document is an MND, PlaceWorks will be responsible for posting the documents with the State Clearinghouse for the public review period, as required by CEQA. The City will be responsible for local noticing.
18 • • G. Scope of Services

Page 983 of 1100 ends

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

6.3 Response to Public Comment
PlaceWorks will respond to substantive comments received on the appropriate/preferred CEQA document in a memorandum form.

6.4 Notice of Determination/Notice of Exemption
PlaceWorks will prepare a notice of determination (NOD) or the Notice of Exemption (NOE) for the City to submit to the County Clerk, as required. The City will be responsible for filing the NOD and paying associated fees.

PlaceWorks will prepare three versions of the Initial Study and appropriate/preferred document (Addendum, Exemption, or MND), and MMRP. These include an Administrative Draft, Screencheck Draft, and Final Draft.

PlaceWorks will respond to one round of consolidated comments on the Administrative Draft. PlaceWorks will submit a revised, Screencheck Draft to City staff as an electronic file. PlaceWorks will respond to one round of consolidated comments on the Screencheck Draft and prepare a Final Drafts for the City.

Task 7. Construction Administration (Optional)
As an optional task, the PlaceWorks team is available to assist the City with construction administration, including the following subtasks. The number of hours is approximate based on similar projects and can be evaluated if services are needed.

RD Bidding. To assist the City during the bid process, PlaceWorks will attend one pre -bid meeting to assist City staff in answering contractor questions, prior to the submittal of bids; prepare technical information or changes to include in addenda being prepared by the City, and respond to requests for information. w Construction Site Visits. The PlaceWorks team will attend a pre -construction meeting with City staff and the Contractor to review the drawings and specs. Following this meeting, PlaceWorks will participate in one project coordination meeting per week of the anticipated construction phase and review the required mock- ups and field samples as indicated in the Technical Specifications as part of these meetings. ▪ Submittal Responses. The PlaceWorks team will review submittals for conformance to plans and specifications and prepare a written response for each submittal. • RFIs and Supplemental Information. The PlaceWorks team will respond to questions from the Contractor in the field, as requested by the City. PlaceWorks will respond in a timely and efficient manner to the contractor's requests for additional information.
• Punchlist. The PlaceWorks team will develop a draft punch list for the field inspector and contractors review following a pre -final site visit. PlaceWorks will participate in a final site visit to go over the items in the punch list, once the contractor has indicated the list is complete.

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAUMONT

Page 984 of 1100 ends

G. Scope of Services II ■ 19

H: Project Schedule
FIGURE 2 SCHEDULE
Months
00 II- JO 996 e6ed
Proje ct Tasks
proiect Initiation & Pro lect Menaeemen t
City Star/Meetin g e1: Kickoff M eeting and Site Visit
on - going Protect Management
pea G atiterIrtg and Sit. Analyak
ticarvy
Prelimina ry Title Repo rts, Stree t ROW Vacatio n, and Parcel Merger
Gaotechnial I nrestiptita
Hydrolo gical Assessment
Site An alysise..I:I Concept ReyieW
City Slag Mee ting NT. Site Analysi%and Dowers
Considerations
preliminary De slen & Co mmunity En aement
Sche matic Design
City Stan M eetin g Ilk Schematic Design
ookne Sur rey
CiyCo uncl Meetin g el Scheme rs De sign
Daft Design Development
City Sta ff Meeting et Desig n Development
Revised Design Development (3c%Draw ing .rid
Cog Eatimatel
atycouncll Meeting 42: Design DevNopercnt
City Safi Meeting 115 and Fttid Rev iew: Preparing, for Final Design
nt
PSSE
Oty Sall M eeting PP and Field Rev ere. 60%PS.E
100%PS.E Su bmittal
pry Staff M eeting at 100%PS.E Su bmittal
Fin al PS.E (bid Se t)
Coordination & Permitting
Southern CeUBorN . Edison ISCE)
Beeue nnt Che rry Valley Winer Districtt6CVWD1
Riverside Cou nty Hood Cort in a! and Water Con serv ation District IRCFC&WCD)
Other Utilities (Gas. Telephone. Cable)
Environmen ta l Review
ur inal Stu dy
CEDA Document
Response to Pu blic Com ment
Notice of Determinatio n/Plaice of be rm:Mon
4 5 6
14 15
18 19

11. PlaceWorks Preparation I- Staff Review or 'lfm Online of Pr oject T ask = Work Pr oducts =WA Sorw.y
Project Team -' Ro) ect Team Meetings
Meetings
Field Review/S 40 Wait
City Council
Meetings
Mir
1 C onstruction`
Bidding
MM
"Assumes a 6 month construction period.
20 ■o H. Project Schedule

STEWART PARK IMPROVEMENT PROJECT

CITY OF BEAU MONT

Appendix No. 1: Resumes

Page 986 of 1100 ends

ISABELLE MINN, ASLA, LEED AP
Principal
Isabelle has over twenty years of experience in community -based design and planning. Her work has focused on landscape architecture and urban design, with an emphasis on the protection of open space and natural resources, as well as on improving and greening our urban areas. She has managed a wide range of projects from large, open space master plans to urban forestry plans and site planning and design projects. She strives to create a balance between protecting resources and increasing public access. Isabelle has developed multi -disciplinary studies addressing physical, biological, cultural, and policy issues that affect watersheds. She has also managed many trail planning and design projects, from large-scale trail master plans to construction documents, and she is an expert on the development of urban greening projects. Recently, Isabelle's work has emphasized meeting park and open space needs in park poor communities. She served as the Principal -in -Charge of the Comprehensive Countywide Parks and Recreation Needs Assessment for the County of Los Angeles, the Concord Hills Regional Park Land Use Plan and EIR for East Bay Regional Park District, and the Pigeon Point Light Station State Historic Park General Plan for California State Parks.

HIGHLIGHTS OF EXPERIENCE

OPEN SPACE AND TRAILS
» San Vicente Redwoods Public Access Plan, Santa Cruz County CA » Los Angeles County Trails Assessment and Mapping, LA County CA » Cloverdale Ranches Alternatives Planning, Pescadero CA » La Honda Creek Open Space Preserve Master Plan, La Honda CA » Laguna de Santa Rosa Protected Lands Trail Plan, Sonoma County CA » Wavecrest Concept Plan, Half Moon Bay CA
» Mori Point Trail Planning and Design, Pacifica CA

PARKS AND CIVIC LANDSCAPES
»
Los Angeles Countywide Comprehensive Parks and Recreation Needs Assessment, LA County CA
Master Plan for Sustainable Parks and Recreation, LA County CA Saratoga Quarry Park Master Plan, Saratoga CA
Martial Cottle Park Master Plan, San Jose CA
Trancas Crossing Park and Napa River Trail, Napa CA
Windsor Gateway Mixed -Use Development Project, Windsor CA

HABITAT RESTORATION AND RESOURCE PLANNING
»
Los Angeles River Ranger Establishment Plan, Los Angeles CA Benicia Urban Waterfront Enhancement and Master Plan, Benicia CA WaterTalks: Planning for Water in Underserved Communities, Los Angeles and Ventura Counties
Lake Merritt Bird Island Enhancements, Oakland CA
Comanche Creek Vegetation Management Plan, Chico CA
Trancas Crossing Park and Napa River Trail, Napa CA
Breuner Marsh Restoration EIR, Richmond CA
Lower Peninsula, West Valley, and Guadalupe Watershed Stewardship Plans, Santa Clara County CA

EDUCATION
»
MS, Resource Ecology and
Management, University of
Michigan, Ann Arbor
Master of Landscape Architecture,
University of Michigan, Ann Arbor
BS, Environmental and Resource
Science, University of California,
Davis

REGISTRATIONS
» California Licensed Landscape
Architect No. 5248

CERTIFICATIONS
» Leadership in Energy and
Environmental Design Accredited
Professional

AFFILIATIONS
» American Society of Landscape
Architects
» California Urban Forests Council,
Board Member
» Bay Area Trails Collaborative,
Member
Team member since 2001

PLACEWORKS

Page 987 of 1100 ends

URBAN AGRICULTURE AND URBAN FORESTRY
» Salinas Urban Greening Plan, Salinas CA
» Oroville Urban Area Master Greening Plan, Oroville CA » Urban Farm and Garden Master Plan, Alameda CA
» El Monte Urban and Community Forestry Management Plan, El Monte CA » Agricultural Park Consulting Services, Davis CA
» Urban Farm Design Services, Treasure Island, San Francisco CA

ISABELLE MINN
Principal
[email protected]

SITE PLANNING AND DESIGN
»
San Leandro Boulevard -BART Pedestrian Interface Plan, San Leandro CA Bay Clarke-Weeks-Pulgas Conceptual Plan, East Palo Alto CA North Redwood Boulevard Planning Study, Novato CA
Southwest Chico Neighborhood Plan, Chico CA
Sonoma Plaza Pedestrian Corridor and Land Use Study, Sonoma CA Bolinas Lagoon Preserve Conceptual Site Plan, Bolinas CA North Broadway Neighborhood Plan, Bay Point CA
Riverbank Ammunition Plant Specific Plan and EIR, Riverbank CA Windsor Gateway Mixed -Use Development Project, Windsor CA

PUBLICATIONS
» "Stream Restoration and Channel Daylighting" (co-author), In Landscape Architecture Graphic Standards, 1st ed., Leonard J. Hopper (ed.), John Wiley & Sons, 2006

SPEAKING ENGAGEMENTS AND TEACHING
» "Maximizing the Benefits of Urban Greening", 2010 APA California Chapter Conference, Carlsbad CA
» "Parks as Resource Management Tools", 2009 APA California Chapter Conference, Squaw Valley CA
» "Site Planning for Creeks, Riparian Corridors, and Wetlands", UC Davis Extension course AWARDS
Los Angeles County Comprehensive Parks and Recreation Needs Assessment:
2017 Public Outreach Award, California Chapter APA; 2017 Public Outreach Award, California APA, Los Angeles Section; 2016 Marketing & Communications Award of Excellence, California Park & Recreation Society San Francisco Bay Trail Design Guidelines and Toolkit: 2018 Long Range Plan Award, The Waterfront Center; 2017 Urban Design Award, California APA, Northern Section; 2017 Planning Award of Merit, California Trails & Greenways Los Angeles County Master Plan for Sustainable Parks & Recreation: 2019 Award for Excellence in Sustainability, National APA, Sustainable Communities Division; 2017 Sustainability Award: Green Region Initiative, SCAG; 2016 Exceptional Urban Forestry Program Award, California Urban Forests Council; 2016 Innovation in Green Community Planning Award of Merit, California APA, Los Angeles Section
Quarry Park Master Plan: 2016 Outstanding Planning Document Award, California AEP
Salinas Forest Assessment and Urban Greening Plan: 2016 Astounding Urban Forestry Project Award, California Urban Forests Council Martial Cottle Park, San Jose CA: California Chapter APA Award of Excellence, Innovation in Green Community Planning Award, 2011; Northern Section, California APA, Innovation in Green Community Planning Award, 2011

LEADERSHIP AND COMMUNITY
» Board Member, California Urban Forests Council, 2011- 2016

Page 988 of 1100 ends

JESSE JONES, ASLA
Senior Associate, California Licensed Landscape Architect Jesse brings to every project a broad range of experience in landscape design and environmental analysis. Her areas of focus include landscape infrastructure, including low -impact design interventions; school gardens and outdoor learning environments; shoreline parks; and trail planning and design.

As a landscape architect at PlaceWorks, Jesse provides research and design services, including construction documentation, conceptual design, and graphic production for a variety of project types. Currently, Jesse is serving as the project manager for Tidewater Area of Martin Luther King Jr. Regional Shoreline, a 7 acre open space located on the Oakland Estuary that includes a nature play area, outdoor classroom, expansive lawn, coastal planting, shoreline vista points, and an internal trail network.

Jesse is also the project manager for Cross Alameda Trail in the City of Alameda and the Wavecrest Coastal trail in the City of Half Moon Bay. Prior to joining PlaceWorks, Jesse worked as a landscape designer for environmental restoration, as well as and environmental educator and school garden instructor.

HIGHLIGHTS OF EXPERIENCE

LANDSCAPE ARCHITECTURE AND PARK DESIGN
» Tidewater Use Area of Martin Luther King Jr. Regional Shoreline, East Bay Regional Parks District, Oakland CA
» Snow Park and Lakeside Green Streets, Oakland CA
» Shields -Reid Park, Richmond CA
» Iris Chang Park, San Jose CA
» McKay Avenue Entrance to Crown Memorial State Beach, Alameda, CA » Pacheco Marsh Public Access Plan, Martinez, CA

NATURE PLAY AND PLAYGROUND DESIGN
» Markham Elementary School, Oakland, CA
» Jean Sweeney Open Space Park, Alameda, CA
» Pierce Street Park, Albany, CA
» 95th and Normandie Pocket Park, Westmont, CA

TRAIL/STREETSCAPE DESIGN
» Wavecrest Coastal Trail Project, Half Moon Bay CA
» Cross Alameda Trail, Alameda, CA
» Richmond Wellness Trail, Richmond, CA

OPEN SPACE AND RESOURCE PLANNING
» Pigeon Point Light Station State Historic Park General Plan » Master Plan for Sustainable Parks, Los Angeles County CA » Concord Hills Regional Park Land Use Plan, East Bay Regional Parks District » Reimagining Big Basin Redwood State Park, California State Parks

EDUCATION
» Master of Landscape Architecture,
University of California, Berkeley CA
» BA, Environmental Studies and Urban
and Architectural Studies, New York
University, New York NY

REGISTRATIONS
» California Licensed Landscape
Architect No. 6371

AFFILIATIONS
» American Society of Landscape
Architects (ASLA)
Team member since 2013

Page 989 of 1100 ends

PLACEWORKS

AWARDS
» Master Plan for Sustainable Parks, Los Angeles County CA » California Parks & Recreation Society, Award of Excellence, Marketing & Communications, 2016
» California Chapter APA Award of Merit, Innovation in Green Community Planning Award, 2016
» 2011 University Olmsted Scholar, Landscape Architecture Foundation

JESSE JONES
Senior Associate
[email protected]

Page 990 of 1100 ends

JEN CHUNG, ASLA
Associate Designer
Jen combines creativity with technical dexterity to transform concepts into visual designs and designs into workable plans. She has worked at multiple scales —from smaller site -scale residential designs to regional -scale design guidelines and vision plans —and her projects reflect various degrees of complexity. She pulls from this breadth of experience and her formidable understanding of design principles to find the ideal solution for every project.

Creativity and technique also inform Jen's graphics and visual communications. She knows how to make a strong visual impact that conveys information clearly and is aesthetically pleasing. Her expertise with a variety of graphics and design programs gives her optimal efficiency, even under time and budget constraints. She possesses a high level of dexterity with using Adobe InDesign, Illustrator, Photoshop, and AutoCAD.

Jen's pursuit of landscape architecture was largely fueled by her desire to improve people's quality of life and enhance local and regional communities. This passion drives her to produce her best effort every time, and she continually surpasses herself with each new assignment.

HIGHLIGHTS OF EXPERIENCE

LANDSCAPE ARCHITECTURE, DESIGN & PLANNING
»
»
Capistrano Beach Park Master Plan 1 Dana Point CA
Tesoro Viejo Master Planned Community 1 Madera County CA Measure A Implementation 1 Los Angeles County CA
Los Angeles River Park Ranger Program Establishment Plan 1 Los Angeles CA Santa Ana River Parkway and Open Space Plan 1 San Bernardino, Riverside, and Orange counties CA
East Bay Regional Park District Climate Adaptation Strategy 1 Oakland CA California Adaptation Planning Guide 1 State of California Laguna Beach Landscape and Scenic Highways Element 1 Laguna Beach CA City of San Mateo General Plan Update 1 San Mateo CA
City of San Mateo Climate Action Plan Update 1 San Mateo CA County of Contra Costa General Plan Update 1 Contra Costa County CA Hawk Ridge Community Design 1 Kings County WA
Desert Horizons Community 1 Indian Wells CA
Mt. San Antonio College Educational and Facilities Master Plan 1 Walnut CA City of Corona General Plan Update 1 Corona CA
Southwest Otay Mesa Specific Plan 1 San Diego CA
3roots Specific Plan 1 San Diego CA
City of Hope Specific Plan 1 Duarte CA
West Carson TOD Specific Plan Park Design 1 West Carson CA SB 2 Planning 1 Department of Housing and Community Development 95th & Normandie Pocket Park 1 Los Angeles CA
West Athens -Westmont 10 -Minute Walk to a Park Plan 1 Los Angeles County CA

EDUCATION
» Master of Landscape Architecture,
California Polytechnic University,
Pomona
» BA, East Asian Studies, University of
California, Los Angeles

REGISTRATIONS
» California Licensed Landscape
Architect No. 6549

AFFILIATIONS
» American Society of Landscape
Architects
Team member since 2016
cs2 PLACEWORKS

Page 991 of 1100 ends

CORPORATE MARKETING & GRAPHIC DESIGN
» 2019, 2018, 2017, and 2016 APA California Conference Materials » 2020, 2018, and 2017 AEP California Conference Materials » 2017 ULI Fall Meeting Conference Materials
» PlaceWorks Corporate Marketing Materials
» Design Graphics for PlaceWorks' Los Angeles and San Diego Offices » PlaceWorks Downtown LA Open House Materials
» PlaceViews Newsletters

JEN CHUNG
Associate Designer
[email protected]

PRIOR EXPERIENCE

LANDSCAPE ARCHITECTURE & CONSTRUCTION DOCUMENTATION
» BLVD63 Apartments 1 San Diego CA
» Pacific City 1 Huntington Beach CA
» Playa Vista Apartment Homes 1 Los Angeles CA
» Meridian Apartments 1 Irvine CA
» River Oaks Apartment Homes 1 San Jose CA
» Park Place Apartment Homes 1 Irvine CA
» 3033 Wilshire High Rise Apartment 1 Los Angeles CA
» 1031 Walnut Apartments 1 San Jose CA
» Orchard Hills Community Development 1 Irvine CA
» Bella Vista Model Homes 1 Irvine CA

DEVELOPMENT PLANS
» El Toro 100 -Acre Parcel Design Guidelines 1 Irvine CA » West Alton Parcel Design Guidelines 1 Irvine CA

VISION PLANS
» Re -envisioning Open Space and Connectivity 1 CA State Coastal Conservancy

GRAPHIC DESIGN & MARKETING
» Corporate Graphics Standards and Rebranding 1 EPTDESIGN » Corporate Marketing Materials 1 EPTDESIGN
AWARDS
» 2018 Winner of APA California Conference Logo Design Competition 1 APA California Chapter
» 2015 and 2013 Winner of TREK Award for Design Research 1 EPTDESIGN Internal Design Competition

Page 992 of 1100 ends

YUE ZHANG
Associate
Yue has more than 8 years' experience in site planning and residential design. Her projects range from large-scale city planning to specific site plan and landscape design. Yue is passionate about site planning and how she can help clients and residents create a sustainable living environment. As a designer at PlaceWorks, Yue is involved in site analysis, design, production, coordination, and submittal processes.

She specializes in landscape design, graphics, document design, 3D modeling and rendering, and lighting analyses.

Yue participated in the 2020 ULI Technical Assistance Panels. She was the major research assistant in 2012 Landscape Architecture Foundation Case Study Investigation Program, in which she evaluated the performance benefits of four great street projects. During her master program, she presented a feasibility analysis for using constructed wetland system to treat and reclaim wastewater in City of Mount Pleasant, UT. This study will guide the construction of Mount Pleasant city wastewater treatment facilities.

HIGHLIGHTS OF EXPERIENCE
»
»
Wildomar Objective Design Standards 1 Wildomar CA
Temecula Objective Design Standards 1 Temecula CA
The El Camino Plan 1 Atascadero CA
PA 61 Otay Mesa Landscape Plan 1 San Diego CA
THE GROVES at Loma Linda Specific Plan 1 Loma Linda CA
Solar Array View Simulation 1 Capistrano Unified School District Water Tank Shadow Study 1 Woodside CA
Newhall Ranch Master Plan 1 County of Los Angeles CA
CollegeTown Specific Plan 1 Fullerton CA
Natomas Residential Design 1 Sacramento CA
Skyline Ranch Master Plan 1 Santa Clarita CA
Harbor Boulevard Corridor Plan and Vision 1 Santa Ana CA Harmony Specific Plan EIR 1 Highland CA
Mill Creek Specific Plan 1 Chino CA
Ramona Creek Specific Plan 1 Hemet CA
Renaissance Rialto Specific Plan 1 Rialto CA
Tesoro Viejo Master Plan 1 Madera County CA
Tesoro Del Valle Master Plan 1 Santa Clarita CA
Oxford Place Development 1 Toronto CA
Glenwood Housing Foundation Landscape Design 1 Laguna Beach CA Santa Ana High School Lighting Study 1 Santa Ana CA
Garey High School Lighting Study 1 Pomona CA
Pomona High School Lighting Study 1 Pomona CA
Westlake Village Site Plan 1 Westlake Village CA
Ocean View Hills Site Plan and Landscape Plan 1 San Diego CA Strada Verde Innovation Park Specific Plan 1 Kings County CA Southwest Village Specific Plan 1 San Diego CA
River Street View Simulation 1 San Juan Capistrano CA
Lost Canyon Golf Community Visual Simulation 1 Simi Valley CA

EDUCATION
» MA, Landscape Architecture, Utah
State University
» BEng., Landscape Architecture,
Southwest Jiaotong University

AFFILIATIONS
» American Society of Landscape
Architects
Team member since 2012

PLACEWORKS

Page 993 of 1100 ends

PUBLICATIONS
» "On the Research Front: 2012 Landscape Architecture Foundation Case Study Investigation and the Case of the Streetscape," Conference Notes for Council of Educators in Landscape Architecture, 2012.

YUE ZHANG
Associate
[email protected]

SPEAKING ENGAGEMENTS
» "Design of a Constructed Wetland for Wastewater Treatment and Reuse in Mount Pleasant, Utah" 12012 Spring Runoff Conference I Logan UT

Page 994 of 1100 ends

LOAN WOODRUFF
istai
Associate
Logan Woodruff is a designer working at the intersection of urban planning and design, landscape architecture, and community engagement. He adds value to projects through dynamic visual storytelling, crisp narrative and technical writing, and a steadfast commitment to approaching planning and design processes through a transdisciplinary and multiscalar lens. Logan delivers solutions that are simultaneously based on rigorous quantitative analysis and emerge from an empathetic understanding of community priorities and local expertise.

HIGHLIGHTS OF EXPERIENCE
»
»
Reimagining Big Basin Vision Plan, California State Parks Mckay Avenue Master Plan, East Bay Regional Parks District, Alameda CA East Bay Vegetation Management Wildfire Prevention JPA Formation Project, East Bay CA
Sutter's Fort Interpretation Master Plan Engagement, California State Parks VTATransit Oriented Development Conceptual Design and Engagement, Gilroy CA Downtown San Bernardino Specific Plan, San Bernardino CA Stockton General Plan Update, Stockton CA
Los Alamitos Town Center Strategic Plan, Los Alamitos CA Cloverdale Zoning Code Update, Cloverdale CA

PRIOR EXPERIENCE
»
Justin -Siena High School Campus Redesign Vision Master Plan, Napa CA Trinity River Strategic Master Plan, Fort Worth TX
Downtown Greensboro Streetscape Master Plan, Greensboro NC Downtown Oakland Specific Plan, Oakland CA
Chabot College Facilities Master Plan, Hayward CA
Las Positas College Facilities Master Plan, Livermore CA Middle Density Residential Zoning Analysis, Oakland CA
AWARDS
» 2020 San Francisco Bay Area NAIOP Golden Shovel Real Estate Challenge

SPEAKING ENGAGEMENTS
» "Adaptation Pathways for Sea Level Rise in Marin City," University of California, Berkeley, 2019

EDUCATION
» Master of Landscape Architecture,
University of California, Berkeley
» Master of City and Regional Planning,
University of California, Berkeley
» Bachelor of Arts, Urban Studies,
Vassar College

AFFILIATIONS
» American Planning Association (APA)
» American Society of Landscape
Architects
Team member since 2020

PLACEWORKS

Page 995 of 1100 ends

LOGAN WOODRUFF
Associate
[email protected]

Page 996 of 1100 ends

ADDIE FARRELL
Principal
Addie is a seasoned project manager who navigates the CEQA and NEPA processes for a wide range of project types, from remediation to recreation to entertainment to health care and beyond. She excels at providing her clients with strategic and holistic support, advising on a broad array of technical and strategic issues. Her dedication and professional style have brought her a number of complex and high -profile projects that have earned awards from both AEP and APA.

Addie leads PlaceWorks' CEQA/NEPA practice for the Los Angeles region and oversees environmental staff from our Los Angeles office, managing diverse in-house and subconsultant teams. She oversees all aspects of the environmental process and ensures adherence to budget and scope. She also presents at public and stakeholder meetings and excels at delivering public and staff presentations, even in high-pressure settings. She pays keen attention to quality and detail and maintains that attention in the most challenging situations.

HIGHLIGHTS OF EXPERIENCE
»
»
»
The Mercury Mixed -Use Development Project IS/MND 1 Pico Rivera CA Norwalk Entertainment District -Civic Center Specific Plan EIR 1 Norwalk CA Tapia Ranch Residential EIR 1 Santa Clarita CA
Southwest Valley Community Plans EIR 1 Los Angeles CA
Prologis Vermont and Redondo EIR 1 Los Angeles CA
Multiview Drive Single -Family Residence with Accessory Dwelling Unit IS/MND 1 Los Angeles CA
Medical Office Building at 508 Las Tunas Drive IS/MND Addendum 1 Los Angeles CA Sepulveda Basin Burrowing Owl Surveys 1 Los Angeles CA
EA Form Preparation for 6 -Lot Subdivision 1 Granada Hills CA Brookside Golf Club Expansion IS/MND Pasadena CA
Arroyo Seco Music and Arts Festival EIR Addendum 1 Pasadena CA Anaheim General Plan Update EIR 1 Anaheim CA
Orange County Great Park Phase 2 EIR 1 Irvine CA
Los Alamitos Town Center GPA Addendum 1 Los Alamitos CA Crescenta Valley High School Field Improvement Project EIR 1 Glendale USD Bright Star Schools Rise Kohyang Charter High School IS/MND 1 Los Angeles USD Malibu Middle and High Schools Specific Plan and EIR 1 Santa Monica -Malibu USD McKinley Elementary School EIR for Campus Master Plan Update 1 Santa Monica - Malibu USD
Grant Elementary School EIR for Campus Master Plan Update 1 Santa Monica - Malibu USD

PRIOR EXPERIENCE
»
»
Inglewood Basketball and Entertainment Center EIR 1 Inglewood CA Arroyo Seco Music and Arts Festival EIR 1 Pasadena CA
Rancho Los Amigos EIR 1 Los Angeles County CA
Treeland Homes EIR 1 Los Angeles CA
Pacific Square San Gabriel Mixed -Use Project EIR 1 San Gabriel CA Topock Compressor Station Environmental Review, Multiple EIRs under DTSC contract 1 Needles CA
Santa Susana Field Laboratory Final EIR for DTSC 1 Ventura County CA

EDUCATION
» BA, Natural Resource and
Environmental Geography,
San Diego State University

AFFILIATIONS
» Association of Environmental
Professionals
Team member since 2020

PLACEWORKS

Page 997 of 1100 ends

ADDIE FARRELL
Principal
[email protected]
»
»
»
»
»
Shriners Hospital for Children MND 1 Pasadena CA
Platinum Residential Project MND 1 Pasadena CA
AngelFest Environmental Assessment 1 Los Angeles CA
Hollywood Center EIR 1 Los Angeles CA
Rose Bowl Lighting Replacement Project 1 Pasadena CA
Griffith Park Performing Arts Center MND 1 Los Angeles CA Hansen Dam Skate Park IS/MND and Environmental Assessment 1 Los Angeles CA Sheldon Skate Plaza IS/MND 1 Los Angeles CA
Lake Machado Operation and Long -Term Maintenance Plan 1 Los Angeles CA Point Fermin and Battery Osgood Historic Evaluation 1 Los Angeles CA Exposition Park Rose Garden Historic Evaluation 1 Los Angeles CA Scripps Mesa Joint Occupancy Project EIR 1 San Diego CA Kern County Solar Projects, Multiple EIRs 1 Kern County CA Santa Barbara Courthouse 1 Santa Barbara CA

SCHOOLS
»
»
»
Scripps Mesa Joint Occupancy Project EIR 1 San Diego CA Innovations Academy New Site Acquisition IS/Exemption 1 San Diego CA Sequoia Elementary School Joint -Use Field Project IS/Exemption 1 San Diego CA Pacific Beach Elementary Joint -Use Field Project IS/Exemption 1 San Diego CA La Jolla High School Whole Site Modernization IS/Exemption 1 San Diego CA Muir at Anderson School Whole Site Modernization IS/MND 1 San Diego CA Montgomery Middle School Whole Site Modernization IS/MND 1 San Diego CA Franklin Elementary School Whole Site Modernization IS/MND 1 San Diego CA Marston Middle School Whole Site Modernization IS/MND 1 San Diego CA AWARDS
» 2018 Environmental Planning Award, APA 1 Arroyo Seco Music and Arts Festival EIR » 2017 Merit Award, Outstanding Environmental Analysis Document, AEP 1 Arroyo Seco Music and Arts Festival EIR
» 2016 Merit Award, Outstanding Environmental Analysis Document, AEP 1 Topock Compressor Station Soil Investigation EIR

PROFESSIONAL ACTIVITIES
» Panelist, AEP Annual Conference 2021, "Subsequent Environmental Review Amidst a Sea of Evolving CEQA Law and Regulations"
» Instructor, 2017 AEP CEQA Essentials Workshop, Inland Empire Chapter » Chair, AEP Awards Committee, San Diego Chapter 1 2007-2009

Page 998 of 1100 ends

KEY PERSONNEL RESUME

EDUCATION
B.S., Civil Engineering;
California Polytechnic
University, Pomona

REGISTRATION
Professional Civil Engineer
CA No. 42393

QUALIFICATIONS
Qualified SWPPP
Developer (QSD) &
Practitioner (QSP) CA,
No. 20900
Envision Sustainability
Professional (ENV SP)

TOTAL YEARS

EXPERIENCE
38 years, 4 yrs with BKF

BRUCE KIRBY, PE, QSD/QSP

SENIOR CIVIL PROJECT MANAGER
Bruce has been involved in land development site engineering and is a professional engineer that has directed the design of many recreational, institutional, educational, retail, commercial, industrial, and residential projects throughout southern California. These projects have included providing such services as preliminary engineering and backbone engineering design for the grading, roadway, storm drain, sewer and water infrastructure required for several large master -planned community projects.

SELECT PROJECT EXPERIENCE
Irvine Sweet Shade Park Project, Irvine, CA
- Provided City with civil engineering and land surveying services regarding new playground areas and ADA upgrades to the Sweet Shade Neighborhood Park
- Topographic basemap was developed using conventional survey methods and then supplementing the base with data from the as -built plans to show the existing drainage system
- Efforts included an ADA field analysis to identify areas of the ADA Path of Travel (POT) that are non -compliant and will need to be modified to meet current ADA criteria
Heritage Park Master Plan, Irvine, CA
- Providing civil engineering design services amd land surveying services to develop a Master Plan on this 37 -acre multi -use park
- Topographic base mapping to define project limits and descriptions of existing features
Due diligence package based upon project research to obtain as -built data - Review of site infrastructure to list and define concerns, impacts, and opportunities
- Once the community outreach is completed with the Childcare Committee and Children, Youth and Families Advisory Committee, Irvine Sports Committee, and Green Ribbon Environmental Committee, then a new Park Master Plan will be developed
Irvine Hicks Canyon Park, Improvement Planning, Irvine, CA - Responsible for providing civil engineering design services for improvements within the approximately 16.7 -acre Park located at 3864 Viewpark Avenue
- Proposed project included civil design of the following elements: access to two newly lighted permanent batting cages with concrete pad for storage, upgraded ADA pathways to four new fenced bull pens with pitchers' mounds; two new scorer's tables with shade (one per field) - Grading and drainage design for the renovation of the existing playground and the two soccer fields with natural turf; and one outdoor fitness course

ADDITIONAL PROJECT EXPERIENCE
- City of Norco, Silverlakes Sports Park
- City of Bakersfield, Dr. Martin Luther King, Jr. Park - City of Laguna Niguel, Laguna Niguel Regional Park
- City of Lindsey,Olive Bowl/ Kaku Park
- City of Templeton, Evers Sports Park
City of Beaumont

Page 999 of 1100 ends

Stewart Park Improvement Project BKF ENGINEERS

KEY PERSONNEL RESUME

EDUCATION
Surveying, Diablo Valley
College, Pleasant Hill, CA

REGISTRATION
Professional Land
Surveyor, CA No. 6868

AFFILIATIONS
California Land Surveyors
Association.

Member since 1991.

TOTAL YEARS

EXPERIENCE
38 years, 31 with BKF

DAVIS THRESH, PLS

SURVEY PROJECT MANAGER
Davis is a Survey Principal, overseeing BKF's survey group. His survey experience spans over 38 years. Davis has been the lead surveyor on numerous projects involving districts, cities, counties, and other local municipalities in California.

He is responsible for management of all phases of land surveying including construction, both aerial and conventional topographic and planimetric surveys, boundary analysis and resolutions, right of way engineering, as - built surveys, digital terrain modeling, directing field and office survey efforts, contract document preparation, cost estimation, and contract administration.

SELECT PROJECT EXPERIENCE
Irvine Sweet Shade Park Project, Irvine, CA
- Provided City with civil engineering and land surveying services regarding new playground areas and ADA upgrades to the Sweet Shade Neighborhood Park
- Topographic basemap was developed using conventional survey methods and then supplementing the base with data from the as -built plans to show the existing drainage system
Efforts included an ADA field analysis to identify areas of the ADA Path of Travel (POT) that are non -compliant and will need to be modified to meet current ADA criteria
Heritage Park Master Plan, Irvine, CA
- Providing civil engineering design services amd land surveying services to develop a Master Plan on this 37 -acre multi -use park
- Topographic base mapping to define project limits and descriptions of existing features
- Due diligence package based upon project research to obtain as -built data - Review of site infrastructure to list and define concerns, impacts, and opportunities
- Once the community outreach is completed with the Childcare Committee and Children, Youth and Families Advisory Committee, Irvine Sports Committee, and Green Ribbon Environmental Committee, then a new Park Master Plan will be developed
Irvine Hicks Canyon Park, Improvement Planning, Irvine, CA - Responsible for providing civil engineering design and land surveying services for improvements within the approximately 16.7 -acre Park located at 3864 Viewpark Avenue
- Proposed project included civil design of the following elements: access to two newly lighted permanent batting cages with concrete pad for storage, upgraded ADA pathways to four new fenced bull pens with pitchers' mounds; two new scorer's tables with shade (one per field) - Grading and drainage design for the renovation of the existing playground and the two soccer fields with natural turf; and one outdoor fitness course

ADDITIONAL PROJECT EXPERIENCE
- City of Dana Point, Capistrano Beach Park
- City of Baldwin Park, Baldwin Park, Phase 3
- City of Irvine, Plaza Park Renovation
City of Beaumonw

Page 1000 of 1100 ends

Stewart Park Improvement Project BKF ENGINEERS

PACE t'
team MEMBERS
MS internationalfrrn tructionh�anaaerrirn�.

Nanyang Technological University,
Singapore, 2000
B5 Mechanical Engineering, Harbin Institute of
Technology China, 1983
YEARS OF EXPERIENC€L
32+Years
Joined PACE in 2000

REGISTRATIONS
Professional Engineer - CA 2005 / 69315

VICE PRESIDENT, RECREATIONAL WATER DIVISION
Zirang Song has civil design/engineering experience spanning back to 1990. From concept to final design and specifications, his areas of expertise include all areas of water infrastructure including water feature/splash pad design, swimming pool filtration system design, lake system design, water storage, pump station design, water conveyance, and construction management. He has specific water feature expertise in concept design, site grading, mechanical engineering design of aquatic facilities, electronic controls, telemetry, advanced disinfection systems and hydraulics. Other responsibilities include construction support and coordination. He also has extensive experience on aquatic facility renovations and regularly coordinates with a number of disciplines to integrate a wide range of design elements including structural, electrical, geotechnical, landscape architecture, and architecture. His background also includes large-scale public works water and sewer infrastructure, making him well -versed in the full spectrum of water engineering. Mr. Song is the Vice President, Recreational Water Division and oversees all of the company's recreational water projects ensuring timeliness and high -quality design products.
select relevant aquatic facility experience
♦ Heritage Park Interactive Water Play Area - Irvine, CA ♦ Terranea Resort Splash Pad, Pools, and Spas - Rancho Palos Verdes, CA ♦ Sheraton Wild Horse Pass Water Features, Pools, and Spas - Chandler, AZ ♦ Pelican Hill Recreation Center Pools and Spas - Newport Coast, CA ♦ Canyon Club at Crystal Cove Pools and Spa - Newport Beach, CA ♦ Westin Monache Pool and Spas - Mammoth Lakes, CA
♦ Westin Riverfront Pool and Spas - Avon, CO
♦ Ritz -Carlton, Lake Tahoe - Truckee, CA
4 Grand Residence Marriott Pool and Spa - Keystone, CO
♦ SilverRock Ranch Resort Water Features - La Quinta, CA 4 Cypress Village Pools and Spa - Irvine, CA
♦ Stonegate Park Pools and Spa - Irvine, CA
terranea
resort

RANCHO PALOS VERDES, CA

Page 1001 of 1100 ends

SPLASH PADS & INTERACTIVE FOUNTAINS QUALIFICATIONS I 5
PACE

Mathematics 1 Realgymnasium Junior College,
Sweden (1963)
LS.ICivii Fngineerinu!Tecnnical olleye of Oreor,.

Sweden (1966)
Graduate Studies in Economics & Marketing/
University of Kentucky Louisville (1968/69)
Diploma in Advanced Concrete Construction/
University of Technology, Stockholm, Sweden (1970)
iLAKS OF tXF'U IhN(.L
42+Years
Created PACE in 1984
Created Pacific Aquascape in 1974
Created PERC Water in 1998

EGISTRATIONS
Professional Engineer/ AZ -1974 / 9376
Professional Engineer / CA -1975 / 24489
Professional Engineer / CO -1985 / 23444
Professional Engineer / NV -1985 / 7029

BINH LE, EIT DESIGN ENGINEER
JOHAN A. PERSLOW, PE FOUNDER
Johan Perslow is a leading engineer in the water resources industry, businessman, and inventor. In 30 years Mr. Perslow has started up and established three successful water resource companies - PACE, PERC, and Pacific Aquascape. Clients look to PACE and Mr.

Perslow to develop and implement concepts which are extremely creative and valuable, and they have a reputation in the market for delivering superior solutions to complex challenges. Mr. Perslow has been the principal designer, consultant, and construction manager for more than 800 state-of-the-art water -resource projects including wildly creative and appealing recreational water systems, recycled water systems, natural - based stormwater management and flood control systems, lake and pumping systems, irrigation -optimization systems, and tertiary water reclamation facilities. He has also been involved with the structural design of numerous interstate highway bridges and other complex structures such as a replacement design proposal for the World Trade Center in New York City. As PACE's Senior Consultant, Principal, and Founder, Mr. Perslow has been at the cutting edge of developing and applying new technology to solve unique water resource challenges.
select relevant aquatic facility experience
Sheraton Wild Horse Pass Resort River Water Features & Pool - Chandler, AZ Infinity Wave Pool Technology Development - Worldwide
Waveyard Surf Wave Pool Technology Development - Worldwide Hilton Waikoloa Village Swim Lagoon, Pools & Water Features - Waikoloa, Hawaii Crystal Lagoon at the San Alfonso del Mar Resort - Algarrobo, Chile Confederation Park Wild Waterworks Action River - Ontario, Canada Westin Mission Hills Resort Water Attractions - Rancho Mirage, CA DancingGreen Resort Water Attractions and Water Infrastructure - Tula Oblast, Russia Binh Le has civil engineering experience spanning back to 2014. His hands-on experience includes interactive water features, entry features, fountains, pools, and spas.

In addition to designing complex water feature systems, Mr. Le provides coordination on all levels of plan set development including coordination with Architecture, MEP, Landscape Architecture, Structural Engineering, Geotechnical Engineering and other disciplines. He also provides technical memos, design memos, construction documents, and detailed technical specifications for all water feature projects. select relevant aquatic facility experience
♦ Ivy Station Aquatic Facilities - Culver City, CA
° Gresham Children's Fountain - Gresham, OR
Disney California Adventure World of Color Interactive Fountain - Anaheim, CA A New Century Plaza - Century City, CA
A One Beverly Hills - Beverly Hills, CA
A Four Season Resort and Residences Napa Valley - Calistoga, CA A Rolling Hills Club House - Rancho Palos Verdes, CA
• Parcel L2 Hotel - Washington DC
A Moffett Gateway Hotel - Mountain View, CA
A Irvine Company Orchard Hill Park 1 - Cresta Vista - Irvine, CA Irvine Company Orchard Hill Park 2 - Terrace View - Irvine, CA bachelor of )oi_oce - Civil Engineer
California State University, Fullerton

REGISTRATIONS
EIT
YEARS nF FXPFRIFNCE
8+Years
Joined PACE in 2014

Page 1002 of 1100 ends

SPLASH PADS & INTERACTIVE FOUNTAINS QUALIFICATIONS 1 6
PACE

PACE
team MEMBERS
MS linemational Canirutti)n naca nt
Nanyanglechnologicat University,
Singapore, 2000
B5 Mechanical Engineering, Harbin Institute of
Technology China, 1983

YEARS OF EXPERIENCE
32+Years
Joined PACE in 2000
Professional Engineer - CA 2005 / 69315

ZIRANG SONG, PE VICE PRESIDENT, RECREATIONAL WATER DIVISION Zirang Song has civil design/engineering experience spanning back to 1990. From concept to final design and specifications, his areas of expertise include all areas of water infrastructure including water feature/splash pad design, swimming pool filtration system design, lake system design, water storage, pump station design, water conveyance, and construction management. He has specific water feature expertise in concept design, site grading, mechanical engineering design of aquatic facilities, electronic controls, telemetry, advanced disinfection systems and hydraulics. Other responsibilities include construction support and coordination. He also has extensive experience on aquatic facility renovations and regularly coordinates with a number of disciplines to integrate a wide range of design elements including structural, electrical, geotechnical, landscape architecture, and architecture. His background also includes large-scale public works water and sewer infrastructure, making him well -versed in the full spectrum of water engineering. Mr. Song is the Vice President, Recreational Water Division and oversees all of the company's recreational water projects ensuring timeliness and high -quality design products.
select relevant aquatic facility experience
Heritage Park Interactive Water Play Area- Irvine, CA
♦ Terranea Resort Splash Pad, Pools, and Spas - Rancho Palos Verdes, CA 4 Sheraton Wild Horse Pass Water Features, Pools, and Spas - Chandler, AZ 4 Pelican Hill Recreation Center Pools and Spas - Newport Coast, CA ♦ Canyon Club at Crystal Cove Pools and Spa- Newport Beach, CA • Westin Monache Pool and Spas - Mammoth Lakes, CA
i Westin Riverfront Pool and Spas - Avon, CO
Ritz -Carlton, Lake Tahoe - Truckee, CA
4 Grand Residence Marriott Pool and Spa - Keystone, CO
SilverRock Ranch Resort Water Features - La Quinta, CA
4 Cypress Village Pools and Spa - Irvine, CA
Stonegate Park Pools and Spa - Irvine, CA
terranea
resort

RANCHO PALOS VERDES, CA

Page 1003 of 1100 ends

SPLASH PADS & INTERACTIVE FOUNTAINS QUALIFICATIONS 1 5
PACE

tiStl i illl?J
Mathematics / Realgymnasium Junior College,
Sweden (1963)
B.S./Civir Engineering Technical College o'. ereer..

Sweden (1966)
Graduate Studies in Economics & Marketing/
University of Kentucky Louisville (1968/69)
Diploma in Advanced Concrete Construction/
University ofTechnology, Stockholm, Sweden (1970)

YEARS OF EXPERIENCE
42+Years
Created PACE in 1984
Created Pacific Aquascape in 1974
Created PERC Water in 1998
KW)! MI kb.

Professional Engineer / AZ -1974 / 9376
Professional Engineer / CA -1975 / 24489
Professional Engineer / CO -1985 / 23444
Professional Engineer / NV -1985 / 7029

BINH LE, EIT DESIGN ENGINEER
JOHAN A. PERSLOW, PE FOUNDER
Johan Perslow is a leading engineer in the water resources industry, businessman, and inventor. In 30 years Mr. Perslow has started up and established three successful water resource companies - PACE, PERC, and Pacific Aquascape. Clients look to PACE and Mr.

Perslow to develop and implement concepts which are extremely creative and valuable, and they have a reputation in the market for delivering superior solutions to complex challenges. Mr. Perslow has been the principal designer, consultant, and construction manager for more than 800 state-of-the-art water -resource projects including wildly creative and appealing recreational water systems, recycled water systems, natural - based stormwater management and flood control systems, lake and pumping systems, irrigation -optimization systems, and tertiary water reclamation facilities. He has also been involved with the structural design of numerous interstate highway bridges and other complex structures such as a replacement design proposal for the World Trade Center in New York City. As PACE's Senior Consultant, Principal, and Founder, Mr. Perslow has been at the cutting edge of developing and applying new technology to solve unique water resource challenges.
select relevant aquatic facility experience
Sheraton Wild Horse Pass Resort River Water Features & Pool - Chandler, AZ Infinity Wave Pool Technology Development - Worldwide
Waveyard Surf Wave Pool Technology Development - Worldwide Hilton Waikoloa Village Swim Lagoon, Pools & Water Features - Waikoloa, Hawaii Crystal Lagoon at the San Alfonso del Mar Resort - Algarrobo, Chile Confederation Park Wild Waterworks Action River - Ontario, Canada Westin Mission Hills Resort Water Attractions - Rancho Mirage, CA DancingGreen Resort Water Attractions and Water Infrastructure - Tula Oblast, Russia Binh Le has civil engineering experience spanning back to 2014. His hands-on experience includes interactive water features, entry features, fountains, pools, and spas.

In addition to designing complex water feature systems, Mr. Le provides coordination on all levels of plan set development including coordination with Architecture, MEP, Landscape Architecture, Structural Engineering, Geotechnical Engineering and other disciplines. He also provides technical memos, design memos, construction documents, and detailed technical specifications for all water feature projects. select relevant aquatic facility experience
1 Ivy Station Aquatic Facilities - Culver City, CA
1 Gresham Children's Fountain - Gresham, OR
■ Disney California Adventure World of Color Interactive Fountain - Anaheim, CA ■ New Century Plaza - Century City, CA
1 One Beverly Hills - Beverly Hills, CA
6 Four Season Resort and Residences Napa Valley - Calistoga, CA 1 Rolling Hills Club House - Rancho Palos Verdes, CA
■ Parcel L2 Hotel - Washington DC
+ Moffett Gateway Hotel - Mountain View, CA
1 Irvine Company Orchard Hill Park 1 - Cresta Vista - Irvine, CA ■ Irvine Company Orchard Hill Park 2 - Terrace View - Irvine, CA ,,c.neint or soence - uvii
California State University, Fullerton
YEARcOF FXPFRIFNCF
8+ Years
Joined PACE in 2014

REGISTRATIONS
EIT

Page 1004 of 1100 ends

SPLASH PADS & INTERACTIVE FOUNTAINS QUALIFICATIONS 1 6
PACE

Michael Puff, PG, CEG
Principal Geologist

EDUCATION
B.S., Geology, 1997, California State
University, Fullerton
Applied Rock Slope Engineering Short
Course, 2006, Association of Engineering
Geologists, Califomia

REGISTRATIONS/

CERTIFICATIONS
PG 7581 (California)
CEG 2341 (California)
Radiological Safety and Gauge Use
Certification, 1997

PROFESSIONAL

AFFILIATIONS
South Coast Geological Society
Mr. Putt is a Principal Geologist with Ninyo & Moore and has extensive experience in providing engineering geology consultation in Southem California. Mr. Putt has extensive experience on a variety of project types, including highways, bridges, bore and jack tunneled undercrossings, hillside and flat -land mass grading projects for residential, commercial, and industrial developments, pipelines, and forensic investigations. Mr. Putt performs project administration and management, prepares and reviews geologic and geotechnical reports and provides third party review services for geotechnical reports. He conducts geologic and geotechnical field evaluations, including detailed logging of large- and small -diameter borings and trenches, and geologic evaluation/mapping. Projects have included fault hazard evaluations, landslide studies, slope stability analysis, seismic refraction studies, geologic reconnaissance studies, forensic evaluations, and construction and inspection services.

EXPERIENCE
27 -Acre Park Project, Wildomar, California: As a Principal Geologist, Mr.

Putt performed a geotechnical evaluation for the proposed 27 -Acre Park located to the north-west of the intersection of La Estrella Street and Porras Road in Wildomar, California. The park site consists of undeveloped hillside terrain. The new park will consist of a Natural Park Area and an Active Park Area. Services included review of regional geologic data and historical aerial photographs, photograph-ic documentation and detailed geologic mapping to document surficial geology and the geologic structure of bedrock exposures, drilling of nine exploratory borings, infiltration testing, laboratory testing, and preparation of a geotechnical evaluation report.

Elysian Valley Gateway Park Project located on Knox Avenue in Los Angeles, California. As Principal Geologist, Mr. Putt provided geotechnical consulting services for the Park Project. This park redevelopment project involved the design of a new view deck surfaced with decomposed granite, dual-purpose retaining walls/seat walls along the Los Angeles River Path, new concrete and decomposed granite walking paths, fitness and bike repairstations, picnic areas, a play structure and interpretive signage. Services included review of background geotechnical data and conceptual improvement plans, coordination with Underground Service Alert for utility markout and acquisition of boring permits from the County of Los Angeles, subsurface exploration and performing percolation testing, la-boratory testing, and engineering analysis, which included evaluating the potential for liquefaction at the site.

Helen Keller Community Park Community Building Project, Los Angeles, California: Serving as Principal Geologist providing geotechnical consulting services and oversight for the construction of a new 4,700 square feet, community building located in Los Angeles.. Site improvements include a new reinforced masonry site wall, new underground utility pipelines, concrete walkways, curb and gutters, as well as new asphalt concrete paving. Earthwork for the project included overexcavation and recompaction below the new building and site wall, as well as the exterior concrete and paving areas in order to remove and replace the undocumented fill soils that exist below the ground surface.

Michael Putt, PG, CEG, Principal Geologist 1 Ninyo & Moore 1 datitgfitcal Olfarofi tefIta1 minces Consultants 1 Michael Puff
Principal Geologist
River Wildnerness Park, Azusa, California: Mr. Putt performed a geotechnical evaluation for the proposed River Wildemess Park project located on Old San Gabriel Canyon Road in Azusa, Califomia. The River Wildemess Park project included the construction of a concession building, a pavilion, restroom, a river overlook, a children's play area, and walking paths, as well as the construction of an overnight camping area southwest of Old San Gabriel Canyon Road.

California California Department of Corrections and Rehabilitation 50 Bed Mental Health Crisis Facility, Chino, California:

Principal Geologist providing geotechnical consulting services for the Califomia Department of Corrections and Rehabilitation 50 Bed Mental Health Crisis Facility project located at the Califomia Institute for Men in Chino, Califomia. The project involves the design and construction of a new two-story, 47,550 square -foot building, paved walkways, and paved parking lots. The new Mental Health Crisis building will accommodate housing, administration, treatment, and custody services that will be needed to support 50 inmates/patients. Services included attendance at a project kickoff teleconference meeting, preparation and submittal of a project work plan and schedule, project coordination, background review, acquisition of security clearances for project personnel, a site reconnaissance meeting and markout of boring locations, subsurface evaluation, laboratory testing of collected soil samples, compilation and analysis of the collected data, and preparation of a geotechnical evaluation report.

Univiersity of California Irvine, Business Unit 2 Building, Irvine, California: Principal Geologist retained for a preliminary geotechnical evaluation for the University of Califomia, Irvine, School of Business, Unit 2 Building project located in Irvine, Califomia. The project involved construction of a new five -level building, with the first level being partially below grade. Services included review of available geologic maps, published literature, aerial imagery, and in-house information; review of seismic data, including fault hazard maps, seismic hazards maps, and other readily available data regarding geologic and seismic hazards within the project area; performance of a geotechnical site reconnaissance to observe the general surface conditions on site, and coordinate with Underground Service Alert for underground utility clearance; performance of a subsurface exploration consisting of the drilling, logging, and sampling of seven hollow -stem auger borings; performance of laboratory testing of selected soil samples to evaluate in -situ moisture and dry density, sieve analysis, expansion index, Atterberg limits, direct shear strength and corrosivity; and preparation of a geotechnical data report pre-senting a summary of geologic hazards, our boring logs, and laboratory test data.

Camp Kilpatrick Replacement Project, Malibu, California: Principal Geologist retained during construction of the Camp Kilpatrick Replacement project located in Malibu, California. The design/build project consisted of construction of a new youth camp that included construction of four new cottages totaling approximately 26,700 square feet, an approximately 7,950 -square -foot Support Center building, an approximately 4,000 -square -foot maintenance/warehouse building, and an approximately 3,700 -square -foot gymnasium/chapel building. The new structures and a new 108 -space parking lot were to be constructed within the area of the demolished buildings and the center open space area between the buildings. Geotechnical services included evaluating the soil and geologic conditions of the site in order to develop geotechnical recommendations for design and construction of the project, as well as percolation testing to evaluate the subsurface suitability of the site for stormwater infiltration. The purpose of our environmental services was to perform a Phase I Environmental Site Assessment (ESA) to evaluate potential environmental concems from the past site uses. The Phase I ESA was performed in accordance with the ASTM International (ASTM), Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process Designation E 1527-05 and Practices for All Appropriate Inquiries (AAI) as set forth in the Code of Federal Regulations (CFR), Title 40, Part 312. The Phase I ESA also included a summary of historical environmental contamination, and regulatory agencies database records. A number of these sites had recognized environmental conditions (RECs).

Michael Putt, PG, CEG, Principal Geologist 1 Ninyo & Moore 1 Pegan QQgsvhbhmIrlt8l'Sdences Consultants 2

4..

PBS

ENGINEERS
t
Proiect Role I
Principal Electrical
Engineer
B.S., Electrical
Engineering
University of California,
Irvine, California
Licenses I
Registered Electrical
Engineer in California
#E-17249
Registered
Communication
Distribution Designer
(RCDD)

LEED AP
23 MECHANICAL ELECTRICAL PLUMBING I CONSULTING ENGINEERS

KUNAL SHAH, PE, RCDD, LEED AP
Principal 1 Electrical Engineer
Background:

Kunal Shah has over 23 years of electrical engineering experience for government, commercial, aviation, healthcare, and higher educational facilities, which include major State and Federal funded modernization projects. His responsibilities include construction cost estimating, specification writing, construction administration, bidding and negotiation and all aspects of electrical engineering and design.

Kunal has designed power, lighting, and signal systems for various large-scale facilities and campuses. This includes large airports, hospitals, universities, performance venues, and retail malls.

Kunal is experienced in designing several types of projects from renovations to new construction allows him to bring different perspectives and solutions to every project he engages. Further, Mr. Shah has experience in multiple delivery methods for projects, including design build, CMAR, and Lean Project Delivery.

Project Experience:

Abalone Cove Shoreline Park, Rancho Palos Verdes, California Parking Lot and Restroom Building Renovation
PBS provided design of the Electrical systems for the renovation of the existing Parking Lot and Restroom Building, located at the Abalone Cove Shoreline Park in Rancho Palos Verdes, California. The scope of work included providing electrical power for the parking lot gate control, pay station money, credit card and ticket receiver station. Also provided electrical system for the restroom renovation.

City of Santa Ana - Santa Ana Regional Transportation Center, Santa Ana, California New Bike Station
PBS provided MEP engineering design services for this new bicycle center including indoor bicycle storage, lockers, restrooms with showers, a storage room and a community bicycle workshop.

Los Angeles County Belvedere Park Gymnasium, Los Angeles, California Electrical Grounding System
PBS provided electrical engineering design for rerouting of existing failed 40 amp panel sub -feed with new 40 amp conduit/wire sub -feed.

City of Long Beach - Wardlow Park, Long Beach, California Restroom Renovation
PBS provided MEP Engineering Design Services for the modernization/upgrade of the existing men's/women's park restrooms. The design included new ventilation, plumbing fixtures and LED lighting.

University of California Riverside, Riverside, California Track and Field Renovation
Provided Electrical engineering services including production of construction documents based on the bridging documents. This included infrastructure and provisions for the underground conduit system and stub -outs for the future data systems, press box and elevator.

Riverside County Office of Education, California
ADA Compliance for Restroom Remodel
PBS Engineers provided mechanical, electrical and plumbing engineering service to upgrade one (1) unisex restroom to meet ADA requirements.

Glendora I Houston 1 Los Angeles I San Diego
2100 East Route 66, Suite 210 Glendora, CA 91740 IT 626.650.0350 F 626.650.0352 www.pbsengineers.com

Page 1007 of 1100 ends

E GI` EERS

MECHANICAL ELECTRICAL PLUMBING I CONSULTING ENGINEERS

TARIQ HASSAN, PE
Associate Principal 1 Mechanical Engineer
Project Role 1
Principal Mechanical
Engineer
B.S., Mechanical
Engineering
California State
Polytechnic University
Pomona, California
Registered Mechanical
Engineer in California
#33827
Exp: 6-30-2021
24 Bac round:

Tariq Hassan has more than 24 years of experience of engineering and design for various Mechanical systems, such as HVAC, laboratory and kitchen hood exhaust and ventilation, vehicle garage ventilation, dust collection systems, central plant systems, etc. He has designed these types of mechanical systems for numerous new and existing facilities such as commercial, educational, healthcare, industrial and military facilities, including entertainment centers, computer and data rooms, civil centers, institutional facilities and cogeneration plants.

Tariq has worked as a designer, HVAC engineer, project engineer and project manager during his engineering experience. His primary duties include the design of HVAC, preparation of specifications and cost estimates, performance of mechanical peer review, attendance at project meetings and project coordination.

Additional responsibilities for Tariq consist of initial design development, field investigations, heating and cooling load calculations, preparation of California Administrative Code Title 24 energy compliance documents, specifications, and review of shop drawings and construction project coordination. He is also well - versed in feasibility and comparative energy utilization studies and energy conservation projects such as chilled water, cogeneration and energy audits. He has experience in the field of HVAC and EMS control systems.

Over the years, Tariq has worked for many public agencies within Southern California. His experience lies with the design of various facilities, where the projects are required to be reviewed and approved by various agencies.

Project Experience:

City of Long Beach, Long Beach, California
Colorado Lagoon, Lagoon Playground
PBS designed air distribution system for new Day Care space. (Heat Only). Design exhaust air system for toilet room and designed waste, vent and water plumbing systems for restroom areas, drinking fountain, and sink.

Riverside County Office of Education, California
ADA Compliance for Restroom Remodel
PBS Engineers provided mechanical, electrical and plumbing engineering service to upgrade one (1) unisex restroom to meet ADA requirements.

City of Long Beach - Wardlow Park, Long Beach, California itestroom Renovation
PBS provided MEP Engineering Design Services for the modernization/upgrade of the existing men's/women's park restrooms. The design included new ventilation, plumbing fixtures and LED lighting.

City of Santa Ana - Santa Ana Regional Transportation Center, Santa Ana, California
New Bike Station
PBS provided MEP engineering design services for this new bicycle center including indoor bicycle storage, lockers, restrooms with showers, a storage room and a community bicycle workshop.

Glendora 1 Houston 1 Los Angeles 1 San Diego
2100 East Route 66, Suite 210 Glendora, CA 91740 1 T 626.650.0350 F 626.650.0352 www.pbsengineers.com

Page 1008 of 1100 ends

PBS

ENGINEERS

MECHANICAL ELECTRICAL PLUMBING I CONSULTING ENGINEERS
Louis (Lou) Perez
Associate Principal 1 Senior Electrical Project Engineer Project Role!
Project Manager
Education
Los Angeles City College
Los Angeles Trade Tech
Mount San Antonio
Community College
Background
Lou Perez has over 35 years of diversified experience as an electrical Project Engineer and Project Manager. Hi experience includes the development and design of lighting and power distribution, Title -24 requirements, fire alarm systems, data networking systems, Audio/Video systems, intercom systems and intrusion alarm systems related to educational, institutional, aviation, amusement parks, shopping centers, military, government, health care, commercial facilities and places of worship. His responsibilities include all aspects of electrical design and supervision, as well as many aspects of electrical engineering and construction coordination.

Lou has extensive experience in feasibility studies and utility master planning studies, as well as systems such as communications and signaling, fire alarm and detection, 35+ interior and exterior lighting design and low voltage power distribution. He has designed electrical systems for data centers, Information Technology (IT) for high schools, middle schools and elementary schools. In addition, he is fluent working with all local governing agencies, including the Division of State Architect (DA) planning and local City plan checkers. He communicates with them throughout the development of the contract documents, submission for review and during construction administration, meeting all their requirements.

Project Experience:

Abalone Cove Shoreline Park, Rancho Palos Verdes, California Parking Lot and Restroom Building Renovation
PBS provided design of the Electrical systems for the renovation of the existing Parking Lot and Restroom Building, located at the Abalone Cove Shoreline Park in Rancho Palos Verdes, California. The scope of work included providing electrical power for the parking lot gate control, pay station money, credit card and ticket receiver station. Also provided electrical system for the restroom renovation.

City of Long Beach - Wardlow Park, Long Beach, California Restroom Renovation
PBS provided MEP Engineering Design Services for the modernization/upgrade of the existing men's/women's park restrooms. The design included new ventilation, plumbing fixtures and LED lighting.

University of California Riverside, Riverside, California Track and Field Renovation
Provided Electrical engineering services including production of construction documents based on the bridging documents. This included infrastructure and provisions for the underground conduit system and stub -outs for the future data systems, press box and elevator.

Los Angeles CountyBelvedere Park Gymnasium, Los Angeles, California Electrical Grounding System
PBS provided electrical engineering design for rerouting of existing failed 40 amp panel sub -feed with new 40 amp conduit/wire sub -feed.

Riverside County Office of Education, California
ADA Compliance for Restroom Remodel
PBS Engineers provided mechanical, electrical and plumbing engineering service to upgrade one (1) unisex restroom to meet ADA requirements.

Glendora! Houston 1 Los Angeles 1 San Diego
2100 East Route 66, Suite 210 Glendora, CA 91740 IT 626.650.0350 F 626.650.0352 www.pbsengineers.com

Page 1009 of 1100 ends

P B

NGINEERS

MECHANICAL ELECTRICAL PLUMBING I CONSULTING ENGINEERS
Gregory Morrison
Senior Electrical Design Engineer
zee
Senior Electrical Designer
B.Sc. Electrical Engineering
B.A. Economics California
State University
Los Angeles, California
Affiliations 1
Institute of Electrical &
Electronics Engineers
(IEEE)
BICSI
United States Green
Building Council (USGBC)
Years of Experience 1
38 Background
Mr. Morrison has over 38 years of broad base experience in electrical engineering design. He has had extensive involvement in the analysis, development, and design of numerous electrical systems for government facilities, aerospace, educational (K-12 and higher education), light industrial, retail, military, commercial, healthcare and pharmaceutical laboratories. His responsibilities include existing conditions assessment, evaluation reporting, specification writing, construction observation, construction administration, code compliance review and all aspects of electrical engineering and design.

Mr. Morrison's experience includes design of communication systems, such as audio/video conferencing, intercom, clock, cell sites, wireless, closed-circuit television, security/intrusion, public address, mass notification, fire alarm (manual and automatic), nurse call/code blue, patient tracking, school communications (education technology) and other signal communication systems.

Mr. Morrison has also designed technology systems, horizontal and vertical distribution which includes mission -critical data centers, voice data distribution systems incorporating fiber optic outside plant distribution, vertical data networking with Category 6 copper workstations and telephone systems using both, on -site PBX and Voice -Over IP. These systems have been incorporated into many projects along with the provision for active system components for local area networking. Mr.

Morrison remains current with the latest Cad technologies including AutoCAD MEP and Autodesk including all aspects of Building Information.

Protect Experience:

University of California Riverside, Riverside, California Track and Field Renovation
Provided Electrical engineering services including production of construction documents based on the bridging documents. This included infrastructure and provisions for the underground conduit system and stub -outs for the future data systems, press box and elevator.

Abalone Cove Shoreline Park, Rancho Palos Verdes, California Parking Lot and Restroom Building Renovation
PBS provided design of the Electrical systems for the renovation of the existing Parking Lot and Restroom Building. The scope of work included providing electrical power for the parking lot gate control, pay station money, credit card and ticket receiver station. Also provided electrical system for the restroom renovation.

City of Long Beach - Wardlow Park, Long Beach, California Restroom Renovatir
PBS provided MEP Engineering Design Services for the modernization/upgrade of the existing men's/women's park restrooms. The design included new ventilation, plumbing fixtures and LED lighting.

Los Angeles County Belvedere Park Gymnasium, Los Angeles, California PBS provided electrical engineering design for rerouting of existing failed 40 amp panel sub -feed with new 40 amp conduit/wire sub -feed.

Glendora 1 Houston 1 Los Angeles 1 San Diego
2100 East Route 66, Suite 210 Glendora, CA 91740 1T 626.650.0350 F 626.650.0352 www.pbsengineers.com

Page 1010 of 1100 ends

PBS

ENGINEERS
Ronald (Ron) Martinez
Associate 1 BIM 1 Job Captain
CADD/Revit/Dmfting
Ediochticm
Associates of Science
Degree
Computer Aided Drafting &
Design (CADD)
ITT Technical Institute 1993
Auto Desk Revit Project
Implementation and
Advanced Training Course -
2007
Years of Experience 1
24 MECHANICAL ELECTRICAL PLUMBING
Background
Ron Martinez, a jack of all trades, is responsible for all production management at PBS Engineers. An invaluable part of the PBS team, Ron utilizes over seventeen years of experience managing AutoCAD standard and production as well as quality control of all CADD drawings.

In addition to leading the CADD Department, he is also job captain for key projects, and manages every facet of the project from beginning to end. His expertise also extends into Revit MEP Suite and BIM technology, enabling PBS to be a frontrunner in the utilization of cutting -edge graphic standards.

In addition to his expertise in CADD and Revit, Ron is also an accomplished Electrical Design Engineer with experience in K-12 and high education projects, as well as commercial, aviation, healthcare and municipal projects.

His experience includes communications and signaling systems; protective fire alarm and detection systems, security systems, building automation, fiber optics transmission system, closed circuit television, multiplex transmission, interior/exterior lighting design and low voltage power distribution systems.

Glendora 1 Houston 1 Los Angeles 1 San Diego
2100 East Route 66, Suite 210 Glendora, CA 91740 I T 626.650.0350 F 626.650.0352 www.pbsengineers.com

Page 1011 of 1100 ends

Project Role 1
Clerical
PRS

ENGINEERS

MECHANICAL ELECTRICAL PLUMBING
Stella Diaz
Document Control f Administration
Education 1
Skadron College of
Business
San Bernardino, California
Years of Experience 1
35 Background
Stella Diaz has over 35 years' experience in extensive document control, e.g., preparation of CDBG grants, preparation of resolutions and ordinances, preparation of contracts, preparation of Design Review Committee, Planning Commission and Historic and Scenic Preservation Committee information and legal notices, etc.

Stella has provided document control, both legal and administrative, which involved a high level of security and confidentiality, for the City of Colton and San Bernardino County Sheriff's Department.

Stella maintains a genuine and friendly attitude, effective verbal and communication skills and follows through her assignments with a positive result.

Her professional background is indicative of her skills in the preparation of various types of policy, procedures, highly confidential legal documents, etc.

Stella is experienced in database management, time management and assistance of grant/contract administrative duties. Her proficiency in various software applications is remarkable.

Glendora I Houston 1 Los Angeles 1 San Diego
2100 East Route 66, Suite 210 Glendora, CA 91740 1 T 626.650.0350 F 626.650.0352 www.pbsengineers.com

Page 1012 of 1100 ends

Resume of Experience

STRUCTURAL

ENGINEERING
Alexandros G. Bletsos, SE
Principal
Education:

Master of Science, 2001
California State University, Sacramento
Major: Civil Engineering (Structural)
Bachelor of Science, 2000
University of California, Davis
Major: Civil Engineering (Structural)
Registration:

Registered Structural Engineer, License S5659 (CA)
Registered Professional Engineer in Civil Engineering, License C68288 (CA) Work Experience:

Spire Structural Engineering, Inc 2012 -Present
Lake Forest, CA Principal
Principal of the company responsible for managing a group of engineers and drafters on a wide range of projects. Responsible for the entire project cycle from writing proposal, structural design, getting the project through plan check, and the construction phase. Projects include equipment anchorage for hospitals, tenant improvements, and structural analysis of the structure of specific equipment. The majority of the projects fall under OSHPD jurisdictions.

John A. Martin & Associates 2004- 2012
Los Angeles, CA Senior Project Engineer
Senior project engineer for a wide range of projects that include new design (commercial and public), retrofits, equipment anchorage, and non-linear analysis. The list of projects encompasses a diverse array including office buildings, schools, hospitals, and commercial. Projects covered all types of materials and structural systems. Several of the projects worked on were under DSA and OSHPD jurisdictions.

ABS Consulting (formerly EQE International) 2002-2004
Irvine, CA Design Engineer
Design engineer that designed and detailed seismic retrofits for several concrete tilt up retrofits.

Performed calculations and detailed drawings for several interior remodels. Designed anchorage for electrical, mechanical, and medical equipment. Developed response spectra for several concrete vaults using the soil structure interaction program SASSI. 26461 Rancho Parkway South, Lake Forest, CA
6 .3440 www.soirestructures.com

Resume of Experience
Jeremy C. Welton, SE
Principal
Education:

Master of Science, 2000
University of California, Irvine
Major: Civil Engineering (Structural)
SP

ENGINEERING
Bachelor of Science, Summa Cum Laude, 1996
California Polytechnic State University, San Luis Obispo Major: Architectural Engineering
Registration:

Registered Structural Engineer, License S4614 (CA), 14945 (HI), 48560 (AZ), 20388 (NV) Registered Professional Engineer in Civil Engineering, License C59317 (CA) NCEES Record #36142
Work Experience:

Spire Structural Engineering Inc. 2005 -Present
Lake Forest, CA Principal
Company founder responsible for overall management and engineer of record on various new design and reuse/upgrade projects of all materials and many structural systems. Performed numerous analyses and evaluations of existing structures. Designed equipment anchorage for building and heavy industrial equipment.

Irvine Institute (Dr. Chelapati) 2003-2013
Irvine, CA Instructor
Faculty for Seismic Design review courses for both the professional engineering and structural engineering exams given in the state of California.

Integrated Design Services, Inc. 2004-2005
Irvine, CA Project Manager
Project manager on various retrofits for concrete structures including hospital projects under OSHPD jurisdiction. Designed seismic upgrades for a 12 -story concrete parking garage in San Diego, CA (four levels were subterranean). Performed investigation and designed seismic and gravity retrofits for Palos Verdes Library (four-story split level concrete structure with waffle slabs and two-way flat plates. Plan checked for OSHPD projects.

Cal Poly Pomona 2004-2005
Pomona, CA Instructor
Instructor for Timber Design in Civil Engineering Department. 1-014of110�
26461 Rancho Parkway South, Lake Forest, CA 926'30 949.91 .3440

sweeney + associates
DANIEL L ZUMMALLEND Vice President
Mr. ZumMallen, vice president of the firm, has over 35 years' experience in landscape construction, maintenance, in the United States, he spent a year working and studying horticulture in Scotland. Mr. ZumMallen designs anc irrigation projects from inception to completion using the latest AutoCAD drafting software. He has designed irriga projects all over the world including the United States, the Caribbean, Taiwan, and the Middle East. Over the twe designed the irrigation systems for hundreds of streetscape projects in Southern California.

Mr. ZumMallen's key responsibilities within the organization include coordination and design of irrigati specifications, submittal reviews, as well as construction observations. He is the Principal in Charge of pr production for the entire firm.

Education:

Bachelor of Science - Landscape Architecture, California Polytechnic University, Pomona, CA; Professional Registrations:

Master Gardener Certificate - Royal Horticulture Society, United Kingdom Education with years of graduation: Bachelor of Science Landscape Architecture, 1992 Total years with firm: 25
RELEVANT PROJECTS:

Park projects:

UCLA Mildred E Mathias Botanical Garden, Los Angeles, CA Myriad Botanical Gardens, Oklahoma City, OK
Magic Johnson Park, Los Angeles, CA
Pan Pacific Park, Los Angeles, CA,
Lions Park, Costa Mesa, CA
Los Angeles State Historic Park, Los Angeles, CA
Robertson Recreation Center, Los Angeles, CA

Page 1015 of 1100 ends

CALIFORNIA
skateparks
Zach Wormhoudt
Qualifications
Education: B.S. Landscape
Architecture, California
Polytechnic State University
Certifications: Licensed
Landscape Architect #4305
Selected
Projects
Vans Park Series Paris
Vans Park Series Huntington
Vans Park Series San Paulo
Vans Park Series Bondi
Vans Park Series Montreal
Mosqueda Fresno Bikepark
Skatehalle Berlin
Torun Skatepark
Des Moines Skatepark
Landscape Architect
Experience
Zach had been working as professional Licensed Landscape Architect for over 25 years within the industry. In addition, Zach also has developed expertise in project management, design supervision, budget analysis, schedule development, construction documentation, and construction management.

Venice Beach Skatepark
Lake Cunningham Skatepark
Santa Rosa Skatepark
Woodward Tahoe Skatepark
Louisville Skatepark
Munich Skatepark
Tulsa Regional Pumptrack
Half Moon Bay Skatepark
Zeke M. Pierce Skatepark
Apple Corp Skatepark
Fresno Skatepark

Page 1016 of 1100 ends

Pizzey Park Skatepark
Penwith Skatepark
Las Vegas Skatepark
Macon Skatepark
Watts Skatepark
Cassera Skatepark
Saint Louis Skatepark
Mumbai Skatepark
Bunadoon Skatepark
Peck Park Skatepark
Merced Skatepark

Appendix No. 2: Project Cutsheets

Page 1017 of 1100 ends

Project Type
Location

LAKESIDE GREEN STREETS
Connecting Downtown Oakland to Lake Merritt
Landscape Architecture
Oakland, California
Size 14 acres; 0.5 mile trail
Client
Date Completed
Construction Cost
Services Provided
City of Oakland Community & Economic Development Agency June 2019
$11.7 Million
Landscape Architecture, Urban Design, Community Outreach and Facilitation, Bicycle and Pedestrian Planning, Stormwater Management, Complete Streets Design, Streetscape Design, Green Streets, Waterfront Design, Accessible Design, Park Restoration, CEQA, Construction Administration PlaceWorks worked with the City of Oakland to develop a comprehensive urban greening retrofit along Oakland's iconic Lake Merritt, as outlined in the 2002 Lake Merritt Master Plan. The intersection of Lakeside Drive and Harrison Street was completely reconfigured, and this task served as an opportunity for narrowing and removing paved areas and applying complete streets principles, building roadway rain gardens, and improving the urban character, walkability, and user experience at the lake. The project creates a new pedestrian- and bicycle -friendly multimodal corridor connection along Lakeside Drive and Harrison Street. Adjacent Snow Park was also redesigned, and new features were added to meet the needs of the local community. These include a new state-of-the-art terraced play area and a pedestrian promenade, with a central rain garden featuring a custom art piece by local artists WowHa us. The sculpture represents a mythical water -dwelling creature that connects the site's location near the lake and the rainwater elements in the park. The project was designed to meet Bay -Friendly Landscape standards, including permeable and high-albedo paving, native and climate adapted plantings, and high recycled content in all purchased materials.

PlaceWorks also provided outreach and coordination with the community and multiple advisory committees to create conceptual plans for the park, streetscape, and lakeside improvements. The plans were developed into construction documents that included specific enhancements for roadways, electrical systems, street lighting, and stormwater infrastructure, including ample rain gardens. PlaceWorks' role on this project included environmental review under CEQA and NEPA. PlaceWorks also provided construction administration.

PLACEWORKS

Page 1018 of 1100 ends

Project Type
Location
Size

JEAN SWEENEY OPEN SPACE PARK
Creating Nature in the City
Landscape Architecture
Alameda, CA
27 acres, 1 Mile of Trail
Client
City of Alameda
Date Completed
Phase I and II complete
Construction Cost
$3 Million Phase I Trail, $3.8 Million Phase II Park
Services Provided
Landscape Architecture, Open Space Planning and Design, Construction Documents, Community Garden Design
PlaceWorks prepared design development and construction documents for this unique 27 -acre community park in the heart of Alameda. The design process built upon a masterplan developed by the City with input from residents. PlaceWorks conducted community outreach with residents and stakeholders to ensure that the final project fulfilled their vision for the site. A phasing plan was developed separating construction and bidding of the park into four phases. The first phase of construction includes the Cross -Alameda Trail, a shaded Class I bike trail which runs along the northern edge of Jean Sweeney Open Space Park.

The second phase of construction includes the eastern end of the Park, with a large nature playground, great lawn, picnic pavilion, parking lot and stormwater treatment planting. The park incorporates elements from the site's previous use by the Beltline Railway, including a historic train shelter and interpretive signage about Jean Sweeney's legacy as an open space advocate. The nature play area incorporates natural elements, such as boulders and logs repurposed from City tree maintenance, with playground equipment to create a unique and memorable play experience for both young children and older youth. The third and fourth phases of the park will expand the park by adding, a large community garden, demonstration orchards, a bicycle skills course, habitat planting areas, and hiking trails with ongoing opportunities for outdoor education and nature -watching.

PLACEWORKS

Page 1019 of 1100 ends

Project Type
Location

IRIS CHANG PARK
Memorial and Contemplation Park
Landscape Architecture
San Jose, California
Size 2.5 acres
Client
Date Completed
Construction Cost
City of San Jose
September 2019
$1.8 Million
Services Provided Landscape Architecture, Master Plan, CEC1A, Artistic Design, Construction Documents, Cost Estimating, Construction
Adminstration
PlaceWorks provided master planning, landscape architectural design, and construction documents for a new 2.5 -acre memorial sculpture park in North San Jose. PlaceWorks' CECW staff completed the Initial Study/Negative Declaration necessary for the project. The park is named after Iris Chang, a Chinese-American journalist and author, who wrote the bestselling book, The Rape of Nanking, which covered atrocities committed in China by the Japanese army, a forgotten holocaust of the Second World War. PlaceWorks worked closely with the community as well as with Ms. Chang's parents in shaping the vision for the park, which includes a series of monumental stone sculptures created by the artist Richard Deutsch.

The site is located adjacent to Coyote Creek Trail and the new path system includes an accessible trail connection from the park and its neighborhoods up to the trail, which runs along the top of a levee. The grading required to bring users from ground level to the trail provided inspiration for exuberant curves in path layout and in earthform, allowing the landscape to have a sculptural form of its own.

The park design includes a dynamic planting plan made up of grasses of various textures and sizes arranged in concentric and undulating waves. These textures and forms, combined with the stone sculptures, create a contemplative environment for visitors to consider Iris Chang's legacy.

PLACEWORKS

Page 1020 of 1100 ends

Project Type
Location

MARKHAM ELEMENTARY LIVING SCHOOLYARD
Promoting Outdoor Play in a Sustainable Landscape
Landscape Architecture
Oakland, California
Size

1.15 acres
Client
Date Completed
The Trust for Public Land
Phase 1 Summer 2019; Phase 2 June 2021
Construction Cost
Services
Provided
$500,000
Landscape Architecture, Community Outreach, Environmental Education and Nature Play, Schoolyard Retrofit
The Markham Elementary School project is a collaborative team effort between the Trust for Public Land (TPL), Oakland Unified School District (OUSD) and Markham Elementary community. Located in Oakland's industrial district, the schoolyard and surrounding neighborhood suffer from poor air quality, noise pollution and a general lack of green space. A priority for this project was to create a living schoolyard that promotes outdoor play in a hardy, sustainable and safe landscape.

PlaceWorks worked with TPL to transform underutilized asphalt play courts at the school into a living schoolyard with major features that include an outdoor classroom, numerous nature play areas, an expanded community garden, and an orchard that offers students opportunities for outdoor education and experience working in the garden. Based on design ideas developed in a comprehensive community -outreach process, PlaceWorks developed a site master plan and construction documents.

Phase 1 of the project was completed in the summer of 2019 and included the expanded garden space, the fruit tree orchard, and the shaded seating area.

Phase 2 was significantly influenced by the COVID-19 pandemic with California issuing a statewide shelter -in -place order during the development of construction documents. Oakland Unified School District (OUSD) remained closed during the design phase and the value of outdoor learning spaces became more apparent.

Construction was completed in June 2021, and the site will be ready to welcome students in Fall 2021 with new outdoor classrooms, comfortable spaces for social distancing, and established plant materials. This project will be a celebrated community asset and open space resource to the school and greater neighborhood community for generations to come.

PLACEWORKS

WATSONPARK RENOVATIONS
Dog Park, Playground and Park Entry Improvements
Project Type Landscape Architecture
Location San Jose, California
Size 12.8 acres
Client
Date Completed
Construction Cost
City of San Jose
In Progress
$1.4 Million
Services Provided Landscape Architecture, Community Engagement, Team Coordination, Hazardous Site Development, Construction
Documents, Gateway, Dogpark
Working closely with the City and community members, PlaceWorks identified opportunities to improve the functionality, safety, and aesthetics of this 41 acre park.

Renovations include upgrades to the existing dog park, additional trees and a shade structure, as well as topographical improvements to facilitate better drainage. A welcoming natural stone archway marks the pedestrian entrance to the park. Shade canopies above the play area keep users cool during the summer and new solar - powered lighting extends nighttime visibility from the parking lot into the play area. The park is located over a former landfill that was capped with a protective layer of healthy soil. PlaceWorks worked closely with soil engineers to design park features with minimal impact to the capped site.

PLACEWORKS

Page 1022 of 1100 ends

Project Type

MASTER PLAN FOR SUSTAINABLE PARKS
Promoting Access to Parks and Open Space in LA County
Landscape Architecture
Location
Size
Los Angeles County, California
225,000+ residents
Client
Date Completed
County of Los Angeles, Department of Parks and Recreation February 2016
Construction Cost
N/A
Services Provided
Landscape Architecture, Park Planning, GIS, Urban Greening, Online Engagement, Community Outreach
Awards
2017 Sustainability Award: Green Region Initiative, SCAG; 2016 Exceptional Urban Forestry Program Award, California Urban Forests Council; 2016 Innovation in Green Community Planning Award of Merit, California APA, Los Angeles Section
PlaceWorks prepared a Sustainable Parks and Recreation Master Plan, which consists of Master Plans for six unincorporated communities in Los Angeles County. The six communities include East Los Angeles, East Rancho Dominguez (also known as East Compton), Lennox, Walnut Park, West Athens/Westmont, and Willowbrook, all of which are underserved by parks and open space. Each Master Plan includes components such as a parkland gap analysis, a safety and connectivity analysis, conceptual design plans for potential improvement sites, an urban forestry plan, and a strategic implementation plan.

The planning process incorporated intensive community outreach that included stakeholder meetings, focus groups, community tours and workshops, outreach fairs, surveys, tabling events, and an online youth engagement contest. A number of these activities were conducted in both Spanish and English by staff from PlaceWorks and from the Los Angeles Neighborhood Land Trust, our partner on outreach and public engagement for this project. The Master Plan focuses on implementation through the selection of three high -priority projects for new park and greening concepts in each of the six communities. PlaceWorks developed these design plans and outlined clear steps and strategies for near -term implementation of each project. The Master Plan has been used by the Department of Parks and Recreation as a guide for the implementation of high priority park and greening projects, several of which are currently under development.

The project was awarded the 2016 Exceptional Urban Forestry Program Award from the California Urban Forests Council, and the 2016 Innovation in Green Community Planning Award of Merit from the Los Angeles Section of the California Chapter of the APA, and the 2019 National APA Award for Excellence in Sustainability.

PLACEWORKS

Page 1023 of 1100 ends

PROJECT EXPERIENCE
HERITAGE PARK MASTER PLAN, Irvine, CA
BKF Engineers is working with the City of Irvine to develop a master plan for Heritage Community Park. The plan will focus on enhancing the services and facilities provided within the approximately 44 -acre community park. Heritage Park currently offers a range of activities and supports a range of recreational needs through on -site facilities, which include the Heritage Park Community Center, Fine Arts Center, Child Resource Center, numerous sports fields, play areas, and picnic areas. The Heritage Park will consist of the construction of new playground equipment and an interactive water feature. The City will remove the park's play equipment to make way for new playground amenities including, safer rubber surfacing and added landscaping. The construction will also include a new water feature similar to the one at the Irvine Spectrum, where children's activity will set off jets of water from spray nozzles. The estimated project budget is $1.2 million. BKF's scope of services includes providing conceptual and final engineering for grading, site drainage, on -site conceptual water, sewer and mainline storm drain.

HICKS CANYON COMMUNITY PARK IMPROVEMENTS, Irvine, CA
Hicks Canyon Park consists of a centrally located children's playground and sports field areas on the eastern and western areas of the park. The tot lot/play area includes play equipment for ages 2 to 5 and ages 5 to 12 as well as shade structures, benches, picnic tables, barbeques, and a restroom. The sports field area contains two (2) soccer fields and two (2) baseball diamonds with adjacent bleachers, and a concession area. A walking path surrounds the athletic fields as well as connecting to the playground area.

The Hicks Canyon Trail borders the northern boundary of the park. The proposed project will include development of the following elements: two (2) newly lighted permanent batting cages with concrete pad for storage, ADA pathways, and benches; four (4) new fenced bull pens with pitchers' mounds; two (2) new scorer's tables with shade (one per field); renovation of the existing playground; rehabilitation of the two (2) soccer fields with natural turf; and one outdoor fitness course. BKF is responsible for providing civil engineering design services for improvements within the approximately

16.7 -acre Park located at 3864 Viewpark Ave. The proposed project included Conceptual Civil Design of the following elements: access to two newly lighted permanent batting cages with concrete pad for storage, upgraded ADA pathways to four new fenced bull pens with pitchers' mounds; two new scorer's tables with shade (one per field). Also grading and drainage design for the renovation of the existing playground and the two soccer fields with natural turf; and one outdoor fitness course.

SWEET SHADE PARK, Irvine, CA
BKF Engineers is working to provide the City with civil engineering and land surveying services regarding new playground areas and ADA upgrades to the Sweet Shade Neighborhood Park in Irvine. The project location of the proposed universal playground will be in and around the existing playground, and within the turf areas to the north and/or east of the Ability Center. The City's goal is to develop one playground that is inclusive and universally accessible. The topographic basemap was developed using conventional survey methods and then supplementing the base with data from the as -built plans to show the existing drainage system. Our efforts include an ADA field analysis to identify areas of the ADA Path of Travel (POT) that are non -compliant and will need to be modified to meet current ADA criteria.

City of Beaumont
Stewart Park Improvement Project

Page 1024 of 1100 ends

BKF ENGINEERS arum

SELECT water
features EXPERIENCE

PROJECT NAME DESIGN COMPONENTS
Gresham Children's Fountain
Gresham, OR
Interactive spray ground fountain, two water show fountains with lighting and fountain effects, recirculation and water treatment system for full body contact Terranea Resort
Rancho Palos Verdes, CA
Interactive water play fountain with 25 jets and color changing lights using 17 water nozzles and color changing LED lights, recirculation and water treatment system for full body contact Heritage Park
Irvine, CA
Interactive water play area with 2530 popper jets in 20 ft. diameter fountain area, recirculation and water treatment system for full body contact San Diego Marriott
San Diego, CA
3,400 SF swimming pool, 1,600 SF slide pool, 175 SF spa, 95 sf spa, 2 water walls, waterplay area, and outdoor water feature, recirculation and water treatment system for full body contact The Commons at Downtown Medford
Medford, OR
Ivy Station Aquatic Facilities
Aquarium Plaza Wave Fountain
Culver City, CA
Long Beach, CA
3 fountains, 2 pop jet interactive fountains, and bubbler fountain, recirculation and water treatment system for full body contact
Spray ground, spillway water feature, runnel fountain, cascading fountain, boulder water feature, 600 SF infinity edge pool, 540 SF pool, and 2 spas Redesigned mechanical, structural, electrical, and fountain controls Magic Johnson Park
Los Angeles, CA
SilverRock Ranch Resort Water Features
La Quinta, CA
Entry fountain, reflecting pool, children's water play area, spray ground, recirculation and water treatment system for full body contact
20 acres of lakes, water quality management plan, and manmade rockwall entry water feature City of Champions
Waldorf Astoria
Inglewood, CA
Beverly Hills, CA
Manazel Medical Center Fountains
Rabobank Arena Fountain
Abu Dhabi, UAE
Bakersfield, CA
6 -acre lake featuring multiple elevations and cascading waterfalls Zero edge Myrtha pool, 141 SF spa on 13th floor, 63 SF/13 ft. high waterfeature with light source to enhance effects, recirculation and water treatment system for full body contact 6 entry court fountains, 13,522 SF reflecting pool, 2 MOB fountains,119 SF center fountain, 1,469 SF center reflecting pool
Designed round feature on existing fountain including basin details, water feature components, recirculation, and mechanical system
Centennial Park
Santa Ana, CA
Improved circulation and water quality for existing manmade lake Dali Reignwood Golf Course
Cypress Lawn Lotus Fountain
Dali, China
Colma, CA
750 meter long water feature
Treatment system, fish habitat, fountain structure, and recirculation system for existing koi pond Tesoro del Valle Entry Features
Santa Clarita, CA
Designed recirculation and mechanical systems for two existing fountains Spring Street Park Water Feature
George Page Museum
Natural History Museum
Santa Ana Memorial Pool and Civic Center
Fountain Renovation
Los Angeles, CA
Los Angeles, CA
Los Angeles, CA
Santa Ana, CA
Modern metal water feature with multi -colored tile basin Stream system with filtration to remove tar from surface, UV disinfection 400 SF pond connected by concrete channel to a 1,500 SF table -fountain play area 167'x 65' pool, and renovation design for Fountain #1
Sheraton Wild Horse Pass
Chandler, AZ

1.5 mile long manmade river with rapids, shallow areas, rock outcroppings, and manmade rock formations
Tempe Performing Arts Center
Tempe, AZ
San Bernardino International Airport
San Bernardino, CA
Avenue of the Fountains
Fountain Hills, AZ
16,000 SF reflecting pool basin with 260 FT long negative edge and 7 ft. wall 30 x 10 ft. black granite water wall
6 quarter circular fountains with 5 ft. high walls, cascading steps and 3 fountain jets at base of fountain
Fontana Civic Center
Casino Arizona
Vistancia Community Entry Feature
Fontana, CA
Scottsdale, AZ
Peoria, AZ
Round -a -bout water feature with cascading steps, 2 identical entry water features with 8ft. long glass -like clear water curtains on all four sides of water column 2,300 SF entry waterfeature with 14 glass -like clear water curtains, 8 ft. to 13 ft. long flow lengths
26,000 SF entry feature, naturalized shoreline with blend of natural stone and manmade rock formations
SPLASH PADS 8c INTERACTIVE FOUNTAINS QUALIFICATIONS I

Page 1025 of 1100 ends

PACE

HERITAGE PARK INTERACTIVE PLAY FEATURE

IRVINE, CALIFORNIA
1011.6"..1.111...7

PROJECT SCOPE
II I r MI11r1�111
PACE provided engineering design documents for the
interactive water play area at the Heritage Park project in Irvine, CA. PACE designed one programmed interactive
water play area with 25-30 popper jets in a 20 foot diameter fountain area, located at the children's play area site. PACE provided design services for the water play layout, including the proposed display height and type of fountain nozzle. The design also included the recirculation system piping and pumping requirements and control and show programming
options and concepts for the water jets and colored lights.

PACE also designed the water quality management systems, which included filtration, chemical treatment, overflow and drain systems, automatic water level control systems and electrical demands.

Page 1026 of 1100 ends

PACE

HERITAGE PARK INTERACTIVE PLAY FEATURE

IRVINE, CALIFORNIA
la
41111111111

Page 1027 of 1100 ends

#8906
fir..

PACE

SAN DIEGO MARRIOTT AQUATIC FACILITIES RENOVATION

SAN DIEGO, CALIFORNIA

PROJECT SCOPE
Pools, Spas, Water Play Area and Water Feature: PACE
provided design services for the Marriott Resort Recreation Center in San Diego. PACE provided renovation of a 3,400 sf swimming pool, 1,600 sf slide pool, and a 175 sf spa. PACE also provided engineering and mechanical design of a new 95 sf spa, two water walls, a waterplay area, an outdoor water feature.

Page 1028 of 1100 ends

}
PACE

DISNEYLAND HOTEL COURTYARD RENOVATIONS - AQUATIC FACILITIES

ANAHEIM, CALIFORNIA

PROJECT SCOPE
PACE provided engineering design for all the aquatic
components of the Disneyland Hotel Courtyard Improvements project including the renovation of the Neverland Pool, design of the new North spa (200 sf), South spa (200 sf), Arroyo Pool (approximately 3500 sf), and the addition of a 4,000 square foot water play area called the Magical Springs Pool. The Magical Springs Pool has an 8' deep activity pool with water play components including geysers, pop jets, fountains, water pyrotechnics, four water slides and water slide structure including manmade rockwork that forms the base of the
twenty four foot high water slide. The design involved in-depth coordination with the project design team (architect, landscape architect, MEP, and structural) as well as the Disney project team including facilities, food and beverage, environmental, operations, and Walt Disney Imagineering. There were strict requirements for the operation of this new facility that went above and beyond that of current code requirements. Given extensive existing infrastructure at the hotel, the use of Civil 3D and BIM modeling supported the design process and difficult utility coordination that was needed by identifying and resolving potential conflicts with the renovation design components.

Page 1031 of 1100 ends

i raf
PACE

DISNEYLAND HOTEL COURTYARD RENOVATIONS - AQUATIC FACILITIES

ANAHEIM, CALIFORNIA
Equipment Room Civil 3D Layout

Page 1032 of 1100 ends

#9504
PACE

DISNEYLAND HOTEL COURTYARD RENOVATIONS - AQUATIC FACILITIES

ANAHEIM, CALIFORNIA
Piping and Pools Civil 3D Layout

Page 1033 of 1100 ends

#9504
PACE

GRESHAM CHILDREN'S FOUNTAIN PROJECT AT THE ARTS PLAZA

GRESHAM, OREGON

PROJECT SCOPE
The Gresham Children's Fountain is a public interactive fountain constructed on behalf of the City of Gresham, Oregon.

The fountain operates as a spray ground fountain for interactive play and as a water show for evening entertainment with lights and fountain effects. Fountain #1 is the main fountain with lighting and effects for evening display and Fountain #2 is a smaller fountain intended for small children and does not include lighting.

Fountain #1 consists of a 40 foot diameter concrete surface with 40 smooth bore nozzles producing a thin stream of water that arcs towards the center. Each nozzle location has a pair of nozzles that cross streams at a maximum height of seven feet.

A VFD driven pump drives reduces flow to the outer nozzles and allows the arc to move in and out from the center to the perimeter of the circle and up and down. The fountain water sheet flows to a perimeter trough that is conveyed to a surge tank and the recirculation system ensuring that there is no standing water on the concrete surface. The inner nozzles consists of twenty vertical nozzles that emit a concentrated stream of water at a variety of heights ranging from zero to six and half feet.

There is a center nozzle that can reach a height of 14 feet vertically.

Fountain #2 consists of an 18 foot diameter concrete surface with 12 nozzles that shoot vertically. There is no standing water on the concrete surface. There is an outer circle of vertical nozzles and an inner circle of vertical nozzles. All the vertical nozzles emit a concentrated stream of water at a variety of heights ranging from zero to six and a half feet. These vertical nozzles are flush to the ground and can turn on and off independently from each other.

Both Fountain #1 and Fountain #2 is recirculated and shares a common surge tank and pump station. All the nozzles are located below the surface of each fountain and all the water that comes in contact with the public is recirculated and treated.

Every drop of water prior to it exiting the spray area has been chemically treated with chlorine, filtered, and disinfected with a UV unit.

Page 1034 of 1100 ends

PACE

THE COMMONS WATER FEATURES

MEDFORD, OREGON
NNW`kge 111..' ti .Yid

PROJECT SCOPE
PACE was hired by Lithia Corporation to design of an
interactive fountain for a new park in Medford, Oregon. The design included fountains and an interactive fountain in the Plaza and another at the Stage. New pop jet fountains with a central group of geysers and a linear aligned group of jets with separate controls circuits. PACE coordinated with the local Health Department to comply with strict requirements on the treatment of the water including the use of chlorine and UV disinfection and successfully collaborated with the City of Medford who has several interactive fountains in the area. The City wanted to have the ability to program the PLC's (programmable logic controllers) of the fountains to make any modifications to the show elements. The City of Medford took ownership of the park after construction, so PACE provided an operations -friendly environment in the equipment selection and the pump station building designed for the facility.

Advanced Elements:
• Pop Jet Fountains
• Programmable logic controllers
• Used chlorine and UV disinfection to comply with strict requirements
• Operations -Friendly equipment

Page 1036 of 1100 ends

PACE

THE COMMONS WATER FEATURES

MEDFORD, OREGON

Page 1037 of 1100 ends

#9924
PACE

IVY STATION AQUATIC FACILITIES

CULVER CITY, CALIFORNIA

PROJECT SCOPE
PACE worked with Lowe Enterprises Inc., KFA, Melendrez, and Arup by creating the engineer designs for multiple water features for Ivy Station's landscape architecture located on a 5.2 acre flat bounded by Venice, National and Washington Blvd.'s, and the new expo light rail line to the south. This project in LA includes the development of approximately 200 units of multi -family housing, a select service hotel, approximately 200,000 sf of commercial office space, and between 25,000 and 55,000 sf of retail space.

The water features include one 542 sf pool and one spa
partially flushed and part raised for the residential/apartment area, one 600 sf infinity edge pool for the hotel on the roof level with a stainless steel shell, and four different fountains.

These four natural looking fountains include a boulder water feature � that produces white water sounds, a cascading fountain, a runnel, and a unique spray ground that works in conjunction with a spillway water feature. For the cascading fountain, the landscape architect had a concept that included varying step threads. PACE recommended a specific flow
amount and constructed a full scale model of a section of the fountain to show what that would look like. PACE ran this

Page 1038 of 1100 ends

model with various different flow rates, reviewed the outcome, and selected the flowrate that was best fit for this cascading fountain.

With Ivy Station based in LA county, PACE was challenged by one of the toughest counties in the nation to design when it comes to the health department, safety, and budget allocation.

PACE saw this as an opportunity to use value engineering, resulting in improving functionality, and working within the desired budget.

Advanced Elements:
• One 542 sf pool
• One Partially Flushed and Part Raised Spa
• One 600 sf infinity edge pool
• Stainless Steel Shell
• Boulder Water Feature
• Cascading Fountain
• Runnel Fountain
• Spray Ground
• Spillway Water Feature
PACE

IVY STATION AQUATIC FACILITIES

CULVER CITY, CALIFORNIA

Page 1039 of 1100 ends

#A935
PACE

Project References

CALIFORNIA
skateparks
La Colonia Skatepark
Location:

Size:

Completed:

Contact:

Solana Beach,
California
8,200 SF
May 2019
City of Solana Beach
Kirk Wenger
Parks & Rec Manager
(858) 720-2453
[email protected]
La Colonia Skatepark was designed and built by the
California Skateparks team. The California Skatepark
designers on this project implemented a variety of
small banks, quarter pipes, stairs, rails, china banks, and ledges, that could be used by virtually anyone.

With so many friendly obstacles, La Colonia Skatepark
is a perfect place for beginner and intermediate
skaters to learn the basics and fundamentals of
skating. La Colonia Skatepark also promotes a family
friendly environment that encourages children, teens,
and parents to partake in the action sport community
and culture.

In addition to the beginner friendly terrain, La Colonia Skatepark stands as an aesthetic asset for the City of Solana Beach. California Skateparks artistically crafted the entire park and ensured that every inch of the park was given the proper attention it deserved. A custom mosaic art installation and entrance sign, along with a wavy wall concept was implemented to further elevate the quality of the project. This, along with a bright sky-blue color scheme, help turn this small park into an iconic skate spot.

Project References

CALIFORNIA
a skateparks
El Sereno Skatepark
Location:

Size:

Completed:

Contact:

Los Angeles, California
12,000 SF
August 2018
City of Los Angeles
Craig Raines
Landscape Architect
(213) 928-9052
[email protected]
Designed and built by California Skateparks, the El
Sereno Skatepark offers local skaters and action
sport athletes with a state-of-the-art skate plaza that features street inspired obstacles. These obstacles
include a variety of stair sets, hand rails, ledges,
curbs, and banks. The City of Los Angeles wanted
this park to be a place where individuals of all ages
and skill levels could practice their craft safely and
productively. The skatepark also offers lights, which
allows these athletes to freely skate and ride at their convenience.

El Sereno Skatepark was also designed so that it could host local skate events and jams.

This additional benefit further strengthens the local action sport community by attracting new riders, supporting experienced athletes, and promoting local businesses. Furthermore, skate camps and other after -school activities are held at the park, thus introducing individuals to the benefits of skating and further growing the action sport community.

Cu

PLACEWORKS
700 South Flower Street Suite 600
Los Angeles, California 90017
t 213.623.1443
www.PlaceWorks.com
ORANGE COUNTY • BAY AREA • SACRAMENTO • CENTRAL lAST • LOS ANGELES • INLAND EMPIRE

Page 1043 of 1100 ends

‘k
BEAUMONTA O R N 1
California Levine Act Statement
California Government Code Section 84308, commonly referred to as the "Levine Act," prohibits any Beaumont City Council Member from participating in any action related to a contract or application if he or she receives any political contributions totaling more than $250 within the previous twelve months, and for twelve months following the date a final decision from the business or applicant.

The Levine Act also requires a member of the Beaumont City Council who has received such a contribution to disclose the contribution on the record of the proceeding.

Current Beaumont City Council Members are listed at:
https://www.beaumontca.gov/29/City-Council
Proposers are responsible for accessing this link to review the names prior to answering the following questions.

1. Have you or your company, or any agent on behalf of you or your company, made any political contributions of more than $250 to any Beaumont City Council Member in the 12 months preceding the date of the submission of your proposal or application, or the anticipated date of any Council action?
YES If yes, please identify the Council Member(s):

X NO

2. Do you or your company, or any agency on behalf of you or your company, anticipate or plan to make any political contribution of more than $250 to any Beaumont City Council Member in the 12 months following any Council action related to your proposal or application? YES If yes, please identify the Council Member(s):

X NO
Answering yes to either of the two questions above does not preclude the Beaumont City Council from awarding a contract or approving an application or any subsequent action. It does however, preclude the identified Council Member(s) from participating in any actions related to your proposal or application.
10-21-24
Date Signature of authorized individual
PlaceWorks, Inc.

Company/Applicant Name
City of Beaumont 1 550 E. 6th Street, Beaumont, CA 92223 1 (951) 769-8520 1 BeaumontCA.gov

Page 1044 of 1100 ends

BAUME ONTA -c A L I F O R N I
Staff Report
TO: City Council
FROM: Doug Story, Community Services Director
DATE November 5, 2024
SUBJECT: Award a Professional Services Agreement to The Converse Professional Group for Stewart Park Geotechnical Services in an Amount not to Exceed $39,255 - Capital Improvement Project (CIP) P-10, Stewart Park Improvements
Description Strategic Plan Target #5 Quality of Life/Well-Being, Priority Level #3, Goal #6 Complete Stewart Park Improvements
Background and Analysis:

On June 18, 2024, a Public Works Agreement was awarded to Act 1 Construction Inc. for the construction of Stewart Park Phase 1 Improvements. In order to complete this project efficiently, safely, and in compliance with local and state requirements, staff requested quotes for geotechnical services to support Capital Improvement Project P- 10 - Stewart Park Improvements. Staff requested proposals from several engineering firms. After a review of responses from Sladden Engineering and The Converse Professional Group, it was determined that The Converse Professional Group is the lowest responsible quote.

Submitted Quote Tabulations:

Converse Consultants - $39,255
Sladden Engineering - $22,800
The Converse Professional Group provided a more comprehensive scope of services to ensure the project's compliance and success. Staff requested Sladden Engineering revise their proposal to provide a more comparable scope, however the consultant did not submit a response or an update to their quote. The other contacted firms were not responsive and chose not to submit bids at this time.

Staff recommends the City Council award a professional services agreement with The Converse Professional Group due to their expertise and ability to ensure these projects meet key deadlines including crucial timelines associated with Stewart Park's ORLP grant requirements.

Page 1045 of 1100 ends

The City has executed three agreements with The Converse Professional Group in Fiscal Year 2024/2025 for professional services to support the development of various other upcoming capital improvement projects including WW -11 — Mesa lift Station, CD - 03 — Downtown Revitalization / Real Estate Acquisition, and PS -07 — New Police Station. These projects also require thorough geotechnical investigations to assess soil conditions, analyze subsurface materials, and ensure that design and construction plans meet required safety and performance standards. The services will include site assessments, laboratory testing, and engineering analysis to provide recommendations on foundation design, grading, and other construction -related issues.

Due to the previously awarded agreements, the proposal for Stewart Park will exceed $75,000 for Fiscal Year 2024/2025 and Beaumont Municipal Code Section 3.02.060 states contracts awarded that exceed this aggregate amount shall require City Council approval.

Beaumont Municipal Code Section 3.02.060
City Council approval is required for all contracts for professional services when the cost of the services is $75,000.00 or more. The contract shall clearly state the names of the professionals that will provide services under the contract, along with their hourly rate.

The contract shall also state a "not to exceed" sum. The professional shall not exceed the "not to exceed" sum without the City Council's prior approval. Contracts awarded to any firm shall not exceed an aggregate amount of $75,000.00 in a fiscal year without approval by the City Council.

Fiscal Impact:

Expenditures associated with the additional services are included in the budget for Capital Improvement Project (CIP) P-10. There is no further impact on the general fund.

Page 1046 of 1100 ends

CIP P-10 Stewart Park Project Funding Summary
Estimated Project Cost= $13,576,008
CFD, $3,219,155,
24%
General Fund,
$6,750,000, 50%

DIF - CPARK,
$3,606,853, 26%
CIP P-10 Stewart Park Project Budget Summary
Project
Com•onent
Budget Encumbered Paid to Date Remaining
Bud • et
Projec ,1anagement
Preliminary Services
$6,415 $(4,515) $(4,515) $1,900
.31, 642
$31,642
Design
$697,886 $(697,886) $(669,152)
Perm its
d811113,680 ' $( 0)
Right -of -Way
Cons ruc Ion
$12,610,562 $(11,369,148)I $(1,567,564) $1,241,414
Construction Management $210,234 $(154,235) $(9,233) _ $55,999 Equipment
$5,1.1111m $(5,589)1 $(5,589)
Total
$13,576,008
$(12,245,053)
$(2,269,733)
$1,330,955.,
The cost to prepare this staff report is estimated to be $280.

Recommended Action:

Award a Professional Services Agreement to The Converse Professional Group for Stewart Park Geotechnical Services in an Amount not to Exceed $39,255.

Attachments:

A. Professional Services Agreement
B. Converse Proposal
C. Sladden Proposal

Page 1047 of 1100 ends

D. Converse Levine Act Statement

Page 1048 of 1100 ends

C24-10

AGREEMENT FOR PROFESSIONAL SERVICES BY INDEPENDENT CONTRACTOR

THIS AGREEMENT FOR PROFESSIONAL SERVICES BY INDEPENDENT CONTRACTOR is made and effective upon signature, by and between the CITY OF BEAUMONT ("CITY") whose address is 550 E. 6th Street, Beaumont, California 92223 and Converse Consultants, a Stock corporation formed under the laws of California whose address is 2021 Rancho Dr#1, Redlands, CA 92373 ("CONTRACTOR").

RECITALS
This Agreement is entered into on the basis of the following facts, understandings and intentions of the parties to this Agreement:

A. CITY desires to engage CONTRACTOR to provide the proposal outlining the scope of work and fee estimate to provide as needed geotechnical and material services which will be required during improvements to the Stewart Park in Beaumont, California; and B. CONTRACTOR has made a proposal ("Proposal") to the CITY to provide such professional services, which Proposal is attached hereto and incorporated herein by this reference as Exhibit "A"; and
C. CONTRACTOR agrees to provide such services pursuant to, and in accordance with, the terms and conditions of this Agreement, and represents and warrants to CITY that CONTRACTOR possesses the necessary skills, licenses, certifications, qualifications, personnel and equipment to provide such services.

AGREEMENT
NOW, THEREFORE, in consideration of the foregoing Recitals and mutual covenants contained herein, CITY and CONTRACTOR agree as follows:

1. Term of Agreement. This Agreement is effective as of the date first above written and shall continue until terminated as provided for herein. Notwithstanding anything in this Agreement to the contrary, this Agreement shall automatically terminate after one (1) year unless extended by the parties with the approval of the City Council of the CITY.

2. Services to be Performed. CONTRACTOR agrees to provide the services ("Services") as listed within the Proposal. CONTRACTOR designates Hashmi Quazi as CONTRACTOR'S professional responsible for overseeing the Services provided by CONTRACTOR.

3. Associates and Subcontractors. CONTRACTOR may, at CONTRACTOR's sole cost and expense, employ such competent and qualified independent associates, subcontractors and consultants as CONTRACTOR deems necessary to perform the Services; provided, however, that CONTRACTOR shall not subcontract any of the Services without the written consent of CITY.

4. Compensation.

Page 1049 of 1100 ends

C24-10

4.01 CONTRACTOR shall be paid at the rates set forth in the Proposal and shall not increase any rate without the prior written consent of the CITY. Notwithstanding anything in this Agreement to the contrary, total fees and charges paid by CITY to CONTRACTOR under this Agreement shall not exceed $39,255.00.

4.02 CONTRACTOR shall not be compensated for any Services rendered nor reimbursed for any expenses incurred in excess of those authorized unless approved in advance by the CITY, in writing.

4.03 CONTRACTOR shall submit to CITY, on or before the fifteenth (15th) of each month, itemized invoices for the Services rendered in the previous month. The CITY shall not be obligated to pay any invoice that is submitted more than sixty (60) days after the due date of such invoice. CITY shall have the right to review and audit all invoices prior to or after payment to CONTRACTOR. This review and audit may include, but not be limited to CITY' s:
a. Determination that any hourly fee charged is consistent with this Agreement's approved hourly rate schedule;
b. Determination that the multiplication of the hours billed times the approved rate schedule dollars is correct;
c. Determination that each item charged is the usual, customary, and reasonable charge for the particular item. If CITY determines an item charged is greater than usual, customary, or reasonable, or is duplicative, ambiguous, excessive, or inappropriate, CITY shall either return the bill to CONTRACTOR with a request for explanation or adjust the payment accordingly, and give notice to CONTRACTOR of the adjustment.

4.04 If the work is satisfactorily completed, CITY shall pay such invoice within thirty (30) days of its receipt. Should CITY dispute any portion of any invoice, CITY shall pay the undisputed portion within the time stated above, and at the same time advise CONTRACTOR in writing of the disputed portion.

5. Obligations of CONTRACTOR.

5.01 CONTRACTOR agrees to perform all Services in accordance with the terms and conditions of this Agreement and the Proposal. In the event that the terms of the Proposal shall conflict with the terms of this Agreement, or contain additional terms other than the Services to be rendered and the price for the Services, the terms of this Agreement shall govern and said additional or conflicting terms shall be of no force or effect. Standard of Care; Performance of Employees. CONTRACTOR shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. CONTRACTOR represents and maintains that it is skilled in the professional calling necessary to perform the Services. CONTRACTOR warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Finally, CONTRACTOR represents that it, its employees and

Page 10 ends

C24-10
subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, CONTRACTOR shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the CONTRACTOR's failure to comply with the applicable standard of care. Any employee of the CONTRACTOR or its sub- contractor who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of a Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform Services in a manner acceptable to the City, shall be promptly removed from the Project by the CONTRACTOR and shall not be re assigned to perform any Services to City.

5.02 Except as otherwise agreed by the parties, CONTRACTOR will supply all personnel, materials and equipment required to perform the Services. CONTRACTOR shall provide its own offices, telephones, vehicles and computers and set its own work hours. CONTRACTOR will determine the method, details, and means of performing the Services under this Agreement.

5.03 CONTRACTOR shall keep CITY informed as to the progress of the Services by means of regular and frequent consultations. Additionally, when requested by CITY, CONTRACTOR shall prepare written status reports.

5.04 CONTRACTOR is responsible for paying, when due, all income and other taxes, fees and withholding, including withholding state and federal taxes, social security, unemployment and worker's compensation, incurred as a result of the compensation paid under this Agreement. CONTRACTOR agrees to indemnify, defend and hold harmless CITY for any claims, costs, losses, fees, penalties, interest, or damages suffered by CITY resulting from CONTRACTOR's failure to comply with this provision.

5.05 In the event CONTRACTOR is required to prepare plans, drawings, specifications and/or estimates, the same shall be furnished in conformance with local, state and federal laws, rules and regulations.

5.06 CONTRACTOR represents that it possesses all required licenses necessary or applicable to the performance of Services under this Agreement and the Proposal and shall obtain and keep in full force and affect all permits and approvals required to perform the Services herein. In the event CITY is required to obtain an approval or permit from another governmental entity, CONTRACTOR shall provide all necessary supporting documents to be filed with such entity.

5.07 CONTRACTOR shall be solely responsible for obtaining Employment Eligibility Verification information from CONTRACTOR's employees, in compliance with the Immigration Reform and Control Act of 1986, Pub. L. 99-603 (8 U.S.C. 1324a), and shall ensure that CONTRACTOR's employees are eligible to work in the United States.

5.08 In the event that CONTRACTOR employs, contracts with, or otherwise