M thod i g (cont.)
and after the completion of they construction,. Our daily logs will include daily photos showing site and weather conditions; traffic control measures taken by contractors: (labor, equipment and materials used; quantity of work performed; and major incidents / safety violatfions. We will prepare appropriate electronic logs for keeping track of these activities and will! discuss them during our wee_kllyr progress meetings,.

7. Quality 'Control and Materials Testing
Tb control) the quality of work on any construction project, a number of 'provisions must be bullt into the contract documents.

In addition to the requirements by the Standard Specifications for Public Works Construction (Green book), which sets the minimum standards for controlling the quality at the job site, VE will evalu.uate aid determine individual needs of the projects for a robust QA/ QC program.., These provisions will need to be written into the contract documents, so that the contractors provide an adequate testing (program, necessary for meeting the requirements of the project. As part of our monthly reporting, a section will be dedicated to the QA / QC !program, summarizing the testing and +ir* a review of the contractor's performance,. on a regular basis. IE tearer will evaluate the 'contractor's performance and will recommend changes as necessary. lE inspector~ are provided with the latest technology for documenting and reporting daily activities and are dedicated and trained to make sure the construction work is being conducted in a safe and expeditious manner.

8. Submittal / RIFI Review and Processing
IIE will review and process: contractor's submittals by first preparing a suubrnittaV-IIJst for each. contract. All :submittals and deliverables thhat are required by the contract will be logged through the OE's project management system and rotated to the project's architect ,and eng€neers for review and approval., IIE win meet with the city !priorto bidding, to learn more aboutthe city's requirements for purchasing equipment that is compatible with the citys existing infrastructure. We will also ensure that proper warranties are stipulated for certain items per the ciity's needs to ensure that the maintenance and longevity of these systems are secured over the long haul,. We will also add attic: stock to be purchased by the contractors for the city's future use in maintaining the city'; assets and infrastructure, liE wwi!I!I include the city staff in. the submittal reviews to make sure that the city has an opportunity to review these items. We also arrange for any special: ins!pec:tions ,and training, that. may be required„ Si. Change Order Review
Upon receipt of a change order request. lE will promptly investigate the field conditions to determine if a change in condition may exist. in case the site conditions involve a hazard,,. !IE will work with the Contractor to resolve the issue !immediately under a time and materials basis„ However;, as it was mentioned earlier, VE has learned that every change ordershould start with a Fai=l Iby tlhe contractor. Ail changes to the original plan, and specifications will have to be reviewed by the design engineers first, so that a formal response can be attained, and chances are fully documented. FE will keep track of the change orders through the city's electronic project management system and on the :EE"s monthly executive summary reports, IIE will be managing ail change order work starting from field 'inspection to the finial payments, byfirst verifying them with the designers and then the city, Change orders will be reviewed, and a determination will be made on the merit quickly and expeditiously. Change orders come in variety of ways„ and ft is lE'.s responsibility to determine the cause and to provide a direction to the contractor quic:klly, in our exiperience, change order management is one of the key dements !iin establishing.a fora: but fair relationship with the contractor.
infrastructure Engineers, a Bowman company J Municipal En:g€nee!rirng 'Services November 9, 2023 16

Page 411 of 642 ends

Method I ," y (cont.)
1G. Safety
IE. takes safety seriously, We (know that even one incident on the project 'will taint the project,. As a standard practice, at the. beginning &each meeting, we draw attention to a safety moment.This is to ensure that xl parties and the' constructiRork team make safety on: the job .a priority. We Ibeiier'e that safety must be built Aunt° the a_Uitu.ure of the construction team, and iit mush be the uanderlying condition for conducting any type of construction work. 1E 'will make sure that the latest CAL• OSH,r provisions have been incorporated into the contract documents and 'Ana will monitor the job daily to ensure that all safety precautions. have been (placed at the job site every day.. At the pre -construction meetings, IE will ask to see the Contractor's Re, with and Safety plan .and to irnake sure that a Safety Ofric.e has been identified by the contractor at the on.set of the project, and before, construction starts.: fE will ensure to document and report any. incident or deficiencies that may exist on the project and will he;aro-•active on stopping work that is being conducted without regard to safety precautions. '1 t, Progress Payments
l'E team will meet with the. contractor prior to the first day !of the month to (review the progress pa'lr'mnent summary and to conduct a field review of all work performed, Every progress report along with daily lea s and 'correspondences will be reviewed to 'ensure that the progress payments are accurate and represent a true picture ture of the work. that :has been completed. Retention of the funds will be in accordance with the contract and the inspector and the construction manager will sign on the progress paayment request, prior to submission to the city for processing.. Ail approved change order:, will be listed on the payment requests along with a comprelhelnsive progress report, on all pending change orders and claims,

12.. Inspections
Daily construction logs shall be provided for the city's review on lE`s web -based project management systern.The project inspector will review construction progress :s.chedLiles one a regular basis to verify that the (project is on schedule and on track with project milestones.. The project inspector.wiP (provide accurate Irneaswernents of the work completed by contractors i.r accordance'wit:h contract documents, in addition to the; review of the soli compactor and materials testing reports and I II aAR
upuI IIITII u�i� I IIP ^ III
mllmu iuwpllllll 1 1 h Ft0E �1S III II I
I III II I I II IP I ulullll llll uul II II III ° I ' l l II a -„ul r lulu
plllr III (II I ul uu llw
II
II II tlII V I ll s
I � p i II II I II im�ugl �.
rte.
�� �4J�xa ly �I�"a€•r�k,r+wur, �,'I�d Illlllugll l 1"K r � � IlJuuuuu I II II I II II I II II
":"7"""""14 1� gpYtq {afll PP." uuuuuuuum uuu
wpb: ry4V (1..g '^18 ''I Ed '18` 1
Illlllllllllllllllllllllllllllllll vl"W�
uu°I X 1,6
I I I I ................ Il ly I',i
pmuu
I' lIIIIIuml u uu Ili+u�,f fr�'�Y plpNl 'I nl,
uuluiiiiiuuuu uuuw uuw i uuuuuuuw uuuuuuuuuuuw uuuuuuuw 5 uwuu I „ I I ✓,
r 'ri n
piu4,0
porlymM
E If iu mar tKpan
.zWMtlnac teen ! ry
dos+ls wndrrpa
wrrsrrnyrr
us* woe atmnemonic
n AIIIIM wsnr,an aM
Not ,air =7+ encmo
retionce a Oft • colt,
ffl llr49 note gnt lRi sr
WM* pOop, yr,n,VrrrMtn
ru4nr WY VOMIT 9Ssh
biro mn,{ y orYxnn.utter!no
Wm. +ar'r ooP 4e. Draw.
raMitOk Sa }t 4f&: YC'E4 Miit
aitx91mo O,orNeiots prW
..� Rhos' rSisrr7rR4auU f'F
r o a,"fsw;5 s -an Da icYAi'yfi`
W 42', +,nrats,ryy,ta9
roporProrow arms)
'11-ro pour
I k :1.%crrP
i4,qN'-*Virg Ow iv" en
away ormoCCeel
P,Ch'YhGCIN CACoitMRt"jtpt
spool swtd oftc06 watw
claivovegyEM CJ9A:H kotwo
ogtor Cnts 9xr . re
OOS,}hr, dNO C.{
ill��r LiVimd1OI Ilr�!14",'Qlti (I`IiV
Infrastructure Engineers, a Bowman company ( Municipal Engineering Services I November 9, 2023 17

Page 412 of 642 ends

ethod i l g (cont.)
certifications of coirnpiiair ce, IIIE Viral also review tlhe materiaU testing re:,{ arts regarding quality of work completed. Iuaspeclt.ors wiUl ensure that failed tests are reported and direct tlhe contractor to take correction actions to achiieve full compliance. 'We have vast experience with: installing utility work and will) monitor the contractor's excavation work to prevent and minimize utility conflict delays and potential ,conflicts. We will achieve this by conducting potholing,. which will be required by the contract, and by a thorough review of th:e as -build drawings. E. will prepare and submit to contractor a "Weekclyr Statement cif Calendar / Working Days' report to ensure that the contractor is fully a.wrrare of the schedule and the critical path: activities. Our inspectors have been trained to monitor various contract compliance provisions, as required by the city and outside funding agencies. This is to ensure that these provisions are (being foIVnwed by the contractors.. These provisions rrnay include speclall traffic .safety and access Issuues, job site protection .for safety; SWPPP and NPDES monitoring, CA.Sp certification and inspection, labor compliance (postings and any other special requirements of the Contract.

We have found that compliance with the latest codes should be built into the design and carried averto construction. iE inspectors will also make sure that the contractor is following all the traffic coordination and pern nittiinig. We will coordinate with the contractor to make sure proper access to adjacent businesses / residents has been provided during the duration of constru.action..As noted earlier in the proposal, IE prepares a monthly status and progress report for each one of our cilients and each project. These reports will include budgets, costs, schedule, and resource allocation for each project, ,subrraitted each month for the city review and approval:. We found that this method of reporting works well, providing the city with a document that has all of the key 'project data in one place. These reports will include discussion on change orders, claims., :schedules., and airy other key issues that need direction from the city for managing the project. Our project manager Mr.

Sepal -ii will meet with: the city's project manager individually to go overthe report and to point out any issues that might be going cm with tlhe project, which requires city's attention. Key decisions will be made at these meetings, which wil.i provide directions for a successful: project delivery.,

13. Cilcziims
Claaims management starts even before the bid & award prose; s.1Me have !listed a number of ways that we propose to avoid claims as part of the pre -construction: phase services.. We have also mentioned several safeguards for incorporation into the contract documents to eliminate claims as much as possible. (However, our approach to 'managing claims is based on our 30 years of experience (having managed numerous public works Clfa projects.We will encourage and ask the contractor to submit RFV's on every issue encountered on the job site, to document each potential change. We will investigate these claims and respond back to: the Contractor in a timely inraarniraer,. after the engineer of record has provided our team with a f ormai response, We will then document aVll potential claims and notify the city's project manager on the status of these claims and 'potential change orders on as weekly basis. Ail #iFlls, claims and c.haa.rnge orders wilt be hall died through: the city -s. electronic !project management system. Our goail has always been to work with the contractor to inesoive.ali claims and process all change orders expeditiously by talking a pro -active approach. IIn our experience the best way to handle claims is to deal with them quickly and decisively.

14. Prevailing Wage a' Labor Compliance
Prevailing Wages are requ.uired in accordance with the provisions of the Labor Code of the State of California. General ;pirevaiillii!ng rate of wages are applicable to all construction contract and IE will ensure that the Contractor is compliant to this rulle, during the entire contract. duration., We wilt accomplish this goal by taking a proactive approach to receiivirn and documenting certified payrolls monthly We. will also make sure these reports are uploaded to tlhe Department of lindustiriall Relations 18

Page 413 of 642 ends

Infrastructure IE.inguineers,a (Bowman company I Municipal Engineering Services] November 9,2023

Methodology (c
nl4
n re , wuy mu: l u l l .
nnn!ii r l ll l '�
i�E3,tiw iJ �' Pwar�u�r'�9 wo,rcorw ",1-747o4ww,
I L I
ran i id�r^ �
Idii ai � i i
IIII%�uui,�r, l' i
4 rw,'r4iadl°l 'rwParo I 1� 'Pi
Hill
every month. IE team will also be conducting labor interviews to ensure compliance with ail the er ployrnent requirement and wage rates required by the State's vvages and hour laws. tE will also ensure that the Contractor complies with all of the statutory requirements relating to the employment of apprentices and the city's labor requirements. 15„ Project Closeout
The project dose out starts early, before taking SU bstantva€ completion cm any construction Imoject, tE will start working with the Contractor to collect alll the required product data, pamphlets,. owner manuals and will arrange for training on new systems for the staff and employees. IIE has performed many formal commissioning on complex projects and wilt ensure that all new systems have been tested and perform per the intended design and specifications..

IL will review and 'process; contractor's final payment request and release of retention, in addition to assisting the city wvith preparation and filing of Notice of Completion once the project has been accepted. E wilt organize and deliver ail project documents and flies, in addition to the grant funding forms and ledgers to the city for future use,. All reports, daily dogs and other related construction documents will be submitted to the city electronically.. All as-buihc:f plans will be collected, checked for validity, and sent to the Engineer -of -record for incorporating thern into the: fi nai as - built drawings. iE has also GIS capability in-house?, and can provide the city with a GIS database for all work performed by the Contractors,

16. Community ou,nt.neach:

IE understands that a successful project must involve the corrimunity. PI will prepare a the printed outreach materials and project fact -sheets, working with the city's Community Liaisons to inform the public of upcoming construction activities ;and to collect and document ail input and comments received from the public. We have performed similar services rare other projects, and our team is ready to engage with the public on an as needed basis. Our public outreach coordinator wih1 be Cal/ Hildebrand., who brings many years of experience supporting cities with similar €.>utreaclh initiatives.

17. Federal Requirements
Infrastructure Engineers, :? Bovhliii r3 company
u riuunic:.ipall Engineering Services
November 9„ 20.23
19

Page 414 of 642 ends

eth
dology (c nt.)
Having managed a variety of public improvement projects, supported by funding from outside agencies, IE team in conjunction with Acarrt-Garde is fully aware of the requirements posed by the grant funding rules .and regulations. IE team wiii ensure that .all the funding regulations by the city, state and federal (laws are being coordinated and all the forms are frailly executed, OE will also ensure that the contractor and their subcontractors and suppliers and vendors comply with the state and (Federal orders regarding .affirmative actions to ensure equal employment opportunities and fair employment practices.

IINPDES Compliance and Assistance

1. Industrial / Commercial Facilities Program
IE has so.rccu ssfuIlly inspected alll industrial /commercial facilities wiitlhvin the City of BeIII Gardens a tot& of three times. After several rounds of inspections, IE Ihias developed a database for aIIV commercial and industrial facilities that is frequently updated. Our approach to inspections is toforst confirm the facilities°BA/Ws are being effectively implemented In compliance with municipal ordinance. Oui' inspectors verify that the business is implementing effective source control MVPs .for the pollutants generated by the commercial activity. If the l3h`IPs are not 'adequately protective of water quality, we require additional site --specific controls. Each inspectioro is to be documented by an inspection report that includes a summary of the inspection With photographs. In the future,. when the city obtains ArcGIS, we will ser-ad. the SHIP tile for the city's records. The schedule will be provided to the city and the GI5 file is updated automatically each working day as the inspections progress in real: time. We slhhallll ai so supply a link of completed inspection reports that will be updated at the end of the week to make it easy for city's to tiracIk our progress [in confirming schedule deadlines.

As (part of the inspections, our team takes advantage of the opportunity to fulfill the Business Assistance Program. IE implements the requirements of the Business Assistance Program by providing technical information to businesses to facilitate our effort to reduce the discharge of pollutants in stormwater.We accompllish this by providing California Storrnawater Quality Association (CASQ' y Industrial and Commercial E3MIP guidance specific to each business. We aid by explaining the material in the CASQA. handout and by identifying solutions h[ighiighted in the handout to bring the business to compliance. Our team (provides on -site and over the phone technical advice, both of which are logged in our eVectronic database. Many owners and operators contact our team to discuss potential: solutions or if they have any 'questions regarding the. BMVP handout., we provide consultation tothemm and even go back to the site to discuss in person.

The City of Bell Gardens has two businesses with an industri:ai General Permit Within they Stormwater Multiple Application and Report Tracking System (SMARTS) we versify appropriateWUDVI[) number, and if all reporting requirements are fulfilled for storrmnwater discharges associated with industrial activities. As part of the program, our staff also searches through the (business license list provided by the city to identify if any business based on SIC codes are required to obtain an IGP Any business that is not in complliance or resists complying will be issued a violation letter. Our team coordinate with code enforcement to issue violation letters to bring the facility into compliance. 2„ Planning and. Land Development (Program
As part of the Planning and Land Development Program, Jay Shih shall) coordinate wiith the city's Community (Development Department to obtain a: list of agreements with developers for both new developments and redevelopments over the past ten years to review and identify all E MPs and their maintenance requirements. We shall) dedicate a GIS Iayer to map the I3MPs and create a schedule to inspect them a.11l„ there is a total of five AtOotiA.o.uish alid.BaharBiziodarioa
• mnora Rack arrcMAsmai Pad Oeenup
Infrastructure Engineers! a Bowman company I NNkwiicipal Engineering Services I November9, 2023 20

Page 415 of 642 ends

Meth uI ddoIo (c nt.)
QSPs serving the city that are capable of inspecting 1 Y\1Ps and creating reports and log, highlighting their discoveries and recommendations. GIS is the perfect tool: for this; purpose and can be used to alert our staff two years after the inspection has been completed to inform. inspection commencement deadlines.. tl:. will request to be incorporated as .part of the review process prior to issuing approval!.for final occupancy, our function will be to review operation and (maintenance plan., monitoring (plan and to verify ongoing maintenance provisions for LID practices. (Part'f the review will confirm that all priority development projects retain on -site .Storm Water Quality Design Volume (SW0DV}, CE'Q'A,, mitigation requirements will also be reviewed by our team to make sure they abide by all environmental requirements.

3. Development Construction Program
Our construction management department fed by Masoud Sepahi COn'•rpris..es of (many talented oonstruc tion rn•lamagers and inspectors that are intimately familiar with all Construction Program requirements :set forth in the NPDES guidelines.. All erosion control and sediment control plans wail be reviewed and approved by our QS[-.? r QSP personnel and he on site as part of the inspection, team to confirm adherence to all requirements to prevent illicit construction-refated discharges of pollutants into the IVIS4 Ireceiving waters_O i the field our team willl erasure 3lll non-.storrnwat.eir management and waste management housekeeping practices are adhered to.

For construction sites greater than one acre, our GIS specialist will create a separate layer to develop an ele.ctronic system to inventory ti radl.nlg permits, encroachment permits, demolition permits, building permits and construction permits, As part of our inspection program,. our inspectors will confirm that the.project is enrolled in the Construction General Permit with an active WDID number and that the accompanying .SVVPPP .shall be fulfilled, 4, Public Agency Activities Program
Our team understands that the intent of the Public Agency Activities Program is to prevent and minimize the impacts from MS.4 discharges from P'er•rmrrteee:-owned aired operated facilities and activities. Our GIS specialist will have :a designated layer for 'public facilities and activities such as parking lots,: golf courses, SMiromir1g pools,, materials storage yards, roads,, catch basins and much more.. R≥::
will maintain and update the accuracy of the inventory
through collection of new information obtained through
field activities,. All personnel will be equipped with a device accessible. with GiS to he able to update:any information :regarding such facilities in r'e.a:4 time,
5,: lUhacu•t Difsc..har'ge Detection and Elimination Proq ra.m IE will develop a program to where we shall .act as the database hub for collecting and monitoring illicit Discharge report:s from all departments.. Our fi'i.S Specialist: shall create a layer to highlight ail the information collected from the responder and reporter. Latitude and Longitude information c.oIIected from the report will .be utilized to drop pins for all locations and +.agile create a reminder to Wp,}y1 i4,, v �i
Novr.mher 9„ 2023
Infrastructure Engineers,. a Bowman company Municipal Engineering Services

Page 416 of 642 ends

M tIhodo .y (c s nt.)
confirm that the issue has been, resolved. Included in the GI5 will have information pertaining to the source investigation discoveries and discharge elimination methods„Tlhe discharge elimination method wilV comply with the city's spill response pllan that inclludes procedures to prevent, contain,, and respond to all spills that may discharge into the M54,

6. Public Information and Participation Program
As part of our commitment to educate the (public IE will continue to reach the general population: and ,ethnic communities regarding water quality priorities. Call Hilldelbrand,.our publlic outreach specialist has experience in creating story maps rrn: ArcG S .and its ,experienced in creating brochures utilizing Al technology. it is in all our best interests to help the publlic understand the importance of storrrrowater management for environmental quality and local water resiliency„ Brochures will be created in both: English and Spanish and uploaded to i!nterriet-lbaased platforms, provided at commercial points of purchase, schools and community events,. As part of the program Cali will also document and track the measured effectiveness in achievineq our goals in educating the
COMM nity., From the results of the feedback received„ fnre shall continue to evaluate our current materials and enhance them to better suit Ithe city's needs In achieving community participation.

HHHHHHHH
HI'

7. Watershed Management /TIMM, Programs
In .2012, Ai:d,an Mousavi attended the: first Los .Angeles River Upper Reach 2. (LAR UR2) Watershed Management Program
(WMP) meeting on belhallf of i elf Gardens wiith the cities of E3ell,, Commerce„. Cudahy, Huntington Park, Maywood, and Vernon., wince then IE has been involved with developing the Watershed (Management Program for the City' of Bell Gardens and achieving the milestones set forth in the plan, The WMP clearly characterizes water quality challenges and describes implementation actions and activities to demonstrate that MS4 discharges achieve applicable Water Quality -Based
!Effluent Limitations (WQBELs) and do not cause or contribute to exceedances of Receiving Water Limitations (RWL,$)„ The WMP also enables the iterative Adaptive Management Process (.ANT) strategy which IIE will update every two years per MS4 requirements„ The development of 'the WMP took two years and is .a report our team in the watershed are very (proud of, It also Identifies structural and non-structural Watershed Control, Measures (WCiMs) that we stiff use to tlhis day to ,address water qt aafity priorities. The Water Quality Objectives (WQos) were set using the calibrated model Identified in the Reasonable Assurance .Analysis (RAA)„ Due to our history in developing the'WM.R HE is intimately aware of all the requirements the city is responsible for when achieving a successful implementation.,
The relevant Total Maximum Daiily Loads (TMDL) „appliica€ale to the LAR UIR2 Watershed Managem..pnt Area (WMA) are Nitrogen Compounds., Trash, Metalls and Bacteria. Applicable 'target deadlines to address all relevant TMDLs extend to the year 20 F7 and IE has been assisting the group reach their miilest.ones.'-flrae identified method to'achieve the city's goaalls i,sthrough a mix - case of BMN for infiltration, detention,. constructed wetland, treatment facility, low low diversion., site -scale detention, green irnfrastr'ucturre, flow -through BMP and Source Control Treatment EiMIPs„ Infrastructure EE:rngirnrrers, a Bowman company Municipal Engineering Services November 9, 2023

Page 417 of 642 ends

it , i, !'°logy (co
8, Monitoring and Reporting Program
As with the WMP, tE spent two years in the development of the Coordinated Integrated Monitoring Program ;(: IMP)) for the City of Bell Gardens which MR allow implementation of integrated approach to support the AMP as intended in the M$4 Permit. In the ClM R seven st:E rimvv t•er saurtfalii-based monitoring sites are proposed which have water quality collected annually, from over ?,0'T of the IL.AR t.fll?.2 WM.A. The CIIMP proposes both stormwater and non-stormm:water outtfall-based monitoring that wiii support the Cities Illicit Discharge Elimination Program, IE will follow the requirer yentas set forth in the Monitoring ,and Reporting Program (MRP) l') to assess the chemical,. physical„ and biological €rnn!pacts of MS4 discharges on receiving'w'=titers and compliance toTPy Dij.. wet -weather and dry -weather numeric knit liNasi:e Load Allocations 1.4, I..A.sii, lE wilt utilize the CIMP results to identify and characterize pollutant loads and sources to improve the effectiveness of pollutant contr+:ails iirrdpDer:Tneented, Annual Reports and Semi -Annual Reports information will be collected all year and Incorporated into GIS Mc:othat reporting will be readily available for the (Direc'tor's review two months f>rior to the Submittal deadline, We understand the seriousness of providing accurate reporting data whidh is why we will utilize GIIS in organizing all information year-round and not collecting information be.fcre the deadline,

9. Gerneiral! Stormwa' ar Compliance Consultant Assistance It is of vital importance to act as the city's representative when coordina'tiing with all: agencies. such as L.AEtir'WQCIB, UVIRCA, EPA, etc, while also providing bi-weekly updates to the city staff and elected officialls regarding all NPDES-related activities.

Our team is not only aware of the requirements set forth in the permit, Vi/'MP and CiMP but also has the expertise to provide hydrology analysis and to design various storrrl:wate•r quality projects such as infiltration wells, :storage tanks, wetlands, diversion facilities, detention basins, biofultration, permeable pavement and rn:ore.lE can provide reportiing,.ddesi::c Iii, COS1 estimation .arid has relationships with vendors to be frarriili:airwith long lead iterns to propose alternative solution's for quick construction.. IE has also worked Vvlth Measure W'to. obtain funding for various projects such as the Veterans Park Project, Vile are aware cif .all Safe {,lean Water funding requirements and errdwisiioni securing additional fcinding for future pirojects.

Infrastructure Engineers, a Bowman company I MUnic:iprai Engineering Services I November 9,,2023 23

Page 418 of 642 ends

!YJrI,I fff� qii
What `. ``Le Do ll3est
Our Experts
Methodol
gy
(co tm)
Environmental Compliance and Permitting
Preserving the environment Is essential to the health and safety of our society and is an important service to IE. With a focus on minimizing environmental impacts, IIE offers cost-effective solutions to clients in the pubic sector, the private development industry, and within the conservation community on how to deal with issues such as water scarcity, climate change, managing environmental 'liabilities, regulatory obligations, risk management, and good environmental stewardship, iE offers a unique portfolio of e tensive experience in natural resource inventories, wetland delineations, habitat assessments for threatened and endangered species, and surveys for conservation., development and infrastructure improvement projects. We also provide environmental services such as planning, compliance, and permitting, and we have developed, or contributed to, numerous regional habitat conservation plans (IHC.Ps), statewide parks planning assessments, and endangered species research, planning and compliance projects.

I !Jl l riirlrrrrrirriir'"
R History of successfully providirngenvironmental
services, with particular expertise in services related to natural resource identification, management;,
conservation, and planning.
- Finding cost effective solutions to protect the
environment and navigate ever-changing local,. state,
and federal regulatory requirements.
• Keen understanding of market demands and trends.
• We help to deliver' smarter, healthier, and
environmentally sensitive communities.

Bowman is passionate about finding the best solutions
for our clients, and strives to provide innovative
answers to their environmental needs. Our licensed
professional staff includes:

Professional Wetland Delineators
• Qualified Environmental Professionals
• Certified Wildlife Biologists
▪ Certified Arboriists
▪ LEM'..Accredited Professionals
Infrastructure Engineers, a Bowman company iViu.rnic:ipal Engineering Services I November9, 2023 24

Page 419 of 642 ends

'Environmental Compliance
▪ Section •404 /401 Permitting and
Conrtpliiararwe
▪ Wetland and Stream ,Mitigation
Monitoring
• State Based. EEn rironment:at L;oirn.plllance
Documentation (Ex, CEQA)
INE'PA Documentation
▪ Section 7 Endangered Species Act
• Cumulative Effects Assessment

1. Consultation
NP DES Permitting
Stolrrnnr=:a.ter r''onut'ion Prevention Plans
• Phrase F Environmental Site
Assessments
Phase it EnviirortrrienitalSite
.Assessments
• Hazardous Waste Management
Meth Ll'd oI.,y (co
Natural Resource Surveys and
Assessments
Wetland .and Waters of the UJ,S.
laerllrleafions
• Natural !Resources liarelntcrrie
Wildlife and Vegetatic:n Surveys
'Threatened and Endangered
Species Surveys
Habitat Asse sn)enits
• Habitat Conservation Mans
Forrest Stand D't::li!neation.s
Water Quality Assessment
• 5oil:s,, Geological, and
Georr orplhologis:al Assessment
• Chesapeake !Bay Preservation Area
Studies.
t.)
Environmental Planning and
Management
Natural Resources Management
Plans
Endangered Spedes Conservation
and Management
Land and thriid! iiffe Management
Plans
Forest Corasservation Plans
'Wetland 'Creation and
Enhancement it Desicjrn
Stream Restoration and
Enhancement Design
• Native Vegetation Restoration
• Conservation Easement
Reports and Inspections
w Urban Redevelopment
Bowman's project experience reflects: t . btoad ran
departments work in concert to provide the ti g
your project needs in-house. We focus on care
through at every: phase of your project,.

Infrastructure Engineers, a B.ovvrnan company Municipal Engineering Services I November 9,.2023 25

Page 420 of 642 ends

VIII ulllluur ....,
Pa • e 421 of 642

Management 'Id Staffing
MAS'F ER OAG}kNIZA'1ONAE:. STRUCTURE
rxm;mzdLoPI'IVEhic
Maudur SeEdkns, I%' E, C,EED
CiA
As.iociaEcd
Elsaietatrina. 9ne.
.,.,.,. A. 9 aG2
C lty of Bell Gardens
FPlC�,EhtlEE3tS
rikaso-eid Sepahi, IP E, E-EEI) ( -
Aldan 11h(riuunri, M:E(A, PE,
(Q:SP,r Q5C1
C Berm
T
Sid Mmis.M„ Msa,!PE
"I✓Pi�l �i"i"'�il 11"�r Ma�Carar
n.l
Nkiusa ri; A76E'u4, I E
OSb' QV)
.Awn n.0:-Garrd�
;irtrssl:r,ycture Asr,itextS
I II l�x,� � y�pp�a,j,pap
loud Small PE,. LEM
GA.

Douglas &flash, PE, QSP l
QAI)
f�.Ighoi Smash, PE, QSP l
Q.Sti)
Shawn PAraua5dvz, IMSCE . P.

QSP 7 QSO
Td

Page 422 of 642 ends

Management and Staffing (cont.)
airy EPlGIIPIEERI' EukECmbu:ER.1 0Na STRUCTURE
Avaret:-Gerr,IR+
lbsi th.ligaa, Grade 4 & 5'YVater
I l t ihutfgrs fam!rattrr
lna rr aa'
City of Bell Gardens
wqaraurgyu
Douglas liar a s h, PE, MP f ! S&Y
mt
PaySlylh,PE. CIE P 'MD
novas Janda., fcC S
SLIE t @M1muawr, ['ASCE, FS. CISI^ i.GSD
KEY
(YouwIPas Semsh, PE, QSP r (SC,
iYr

1.irxr. t'i�re(
OPly Perotr:.!E RtlatnYle
37

Page 423 of 642 ends

Management and Staffing (amt.)
CONSTRUCTION AFFAIWIFGLMI;.IITl7Fif,N.IYX'-1010NA 51RUCTWI§.E d
ASS dated Soils
Emiineeling
City of I(3e'IU Gardens_
.irrie,aVrulA, ,,ENGIAIEE:RS
ilipiltl�'kWt n9 t;,m>¢'Ju�ywitn l��'uagei"eaNl
4ergl.::

Mlmsdmid SeoN, FT, L EE)CiA
II ' YA9p�d}� S{ I II
Aran 4ci oarsi, IMS(T
Natsea,, Kirby
Caf11411debcand

Page 424 of 642 ends

Management and Staffing (cont.)
1:7!ESMil' IENGINEEFlIiNG17RG'ANICIAT'QC}NALS'ERUCT rllEE HI
i� a�a � ��,
1 111 11 *
Willa Durand
.Rahn. Marrn:ef
C;arnatr�afx kclks>s,,@fl5
IraEractrfarxure Arctoi karts
II � " t Rra�I�r tJ ,T ntrfi�
.Chadle Man, PE
Balt& Paradarace, Eft"
hrf;Je,a,,S r), AN S.rrn
(Below
of Bell Gardens
ar.

Aldan MOusavl, MeA, PE. QZSP I QSD
1'r�rt�!r�st�raa�pye�W ' ll II
Anair Faarahanl, TE, PE
Hamad Habib., MS
Aoodatad Sa#i.s Er gineein5
n f7[wm^tne; n, ,2l2�� i
111 11 1 &n aI"i "l III fy�It�InA'�YI
(hrfistifphku'teey. PE
lllll�„��r�i��'�� �I4x`mfan�Illlllliilli�
'lielraar v€a r:retx,E;li
.lirtnlFar Sartiiian!
Jael'n'r Murray, Eli
Dark .landa, Inc.

Shama Babakhanian
ifickey.Stui'Ssell
r'a rn rt,rit RrAt]nY(eh,Gfli:

SYr rr.S
:S.pechrfiafhc %Mies
9l Ilnu� rllm��lltillil ,
Cahy'Tntirw.. Cowman
w l.ADbr+ � p7ihi; eefl °liu
Jay Shill, PE,'CASp
KEY
tstar!a�.a..w„t
w.[µsl:nx'2.n4.nEr'
I'GI aldstapelp
ion Becker, MLA,AEOP
0 IOry f'.'mn:::er Earle
89

Page 425 of 642 ends

Management and Staffing (cone)
1�83?R71%:s f IUBSS PG€iPMFT CS?rdaIn, tit NC" E CFR41 INFVF1t1.R51FI.AL. SicliiLiCriJIRIE 6 Bu mv,g 4M iiN �t R pl hi I !' '
Cha Pack., MS, PE, QSP f QSI)
I!*xiSSik. ilea iarS.P.s, I m.

Cameron FaekeY5, PAS
..n
City of .bell Ge it d:eris
E::pettoll�YI:.'Fr1 S
i I guuiRfi�"'�S Frogrdirtl hl,Wl�a�illl�ll�l VIII
.aidarr. IVicvs..uri; ME3,m, PE, .Q1F' 1 CyS'(7
I IIIIIIJ �1, ral �rr3aaJ�il,mli '�'�P
Urievgta5 EsenaS!<. PL, OSP
[JS )
�° IssdlJOvrSar coA4�nheticlal I
one r�MR,Rs, dIIIII
u�3� ar poluuul *
Jay Shill, PE, GSA'
KEY
fkrtyYrt.dm7pF��tlar3trc,tl ',fi
tiro�i �nm �u
l:ali l-Iilr,[ebr3isd

Page 426 of 642 ends

Sig M usa C
Education
M3. CLviill Engineering, California State
Pollytechink University., Pomona
B.S. Civil Engineering., California Skate
Polytechnic University, Pomona
t3.:S. Irrigation Engineering., Azerbaijan
University„ Irani
Registrations
Professional Civil IErigine.er::

California (#42545)

1.kperience priori.° joining the firm
Experience
Principal -in -Charge I Citynf.5outh Mant€, CA
Responsible .for contract oversight of capital projects for the city, which included the Safe Route to School Project (Pedestrian Improvement Project), Durfee Avenue Project (Street and IMeedi.aln h-inipr'ovement Firojecf)„TI i:ienes Avenue Project (street improvement Project), and the New 'Temple Park Improvements (Prefabricated Modular Re'stiroom).

City Engineer City ofBell Gardens, CA
Responsible for approving all capital: projects for the city and providing cost estimates and (budgets for new and upcoming projects. Supervised various Infrastructure Engineers projects as the designated IPrincipatt-In..'Charge, Participated iin deve.lopment meetings and provides support for various (land development projects by establishing conditions for approval of project,. Supervised and directed traffic engineering and water engineering cti'v: t es of the city:. Attended City Council meetings and provided reports of engineering projects to the City CounciL Oversaw the city's NPa4:DES program and ,MS4 Permit compliance.

Principal -in -Charge City ,of Brea,. CA
Principal -in -Charge. Responsible for oversight of performance of !professional services to pro'viide (plans, specifications and estimates (PS&IE) for relhabiliitati'on of alleys east of Brea (Boulevard a:rd south of ftnp&Ial Hig Wray to Date Street, Downtown Parking Structure. i Sewer (Line Upgrade, and Sewer Main Repair in ,?Ales west of Brea Boulevard arud south of Imperial Highway,
Principal -in -Charge COO' Lynwood„ C/"!
Provided oversight of design, construction management, and inspection of street iiir provnrnieimts for Linden Street, Vtirginial Avenue. Walnut ,Avenue, (Redwood Avenue, IE.Ilrmwood Avenue,.OlandaAvenue, and (Las Flores Boulevard., The project included. tolpograp.hic ruin eyrfng to address the drainage issues, removal, and replacement of broken or rlis:sing 'gutters and curbs, subsurface investigation of the existing asphalt. structure, replacement menit of existing damaged or substandard driveways, removal and replacement of trees that have caused damage,. design of ADA-compliant ralmps., and repair or placement of sidewaailcs, where nec.essairy, iE allso provided bkt administration:, ,cornstru.rc.tiorn management services., and inspection for these projects. interim City n nagen, Director of Public Works & Manning and City Engineer City ofBaldwin Prark„ C4
Served as interim City Manager during a 1,4 -month vacancy at the City of (Baldwin P'ark., Responsible for the development of the $40M a nnu,all operating and capital budgets, including the identification of new revenue sources for the city. involved in labor negotiation with seven city labor groups. Also responsible for the enhancement of the city"s public information ,and public relations materials, policy Infrastructure Engineers, a Bouvrrnari company IVir.urticilp,d!I Engineering Services November 9, 2023
311

Page 427 of 642 ends

Sid us E"
Principal -in -Charge
development and implementation, and general administrative oversight of the,city's six departments and more than 300 employ5ees., As Executive Director to the city% r_.ornrnuncty Development Commission, directed the city's redevelopment activities.

Also served as Executive Director of the Baldwin Park Housing Authority., which provided housing services for Baldwin Parkas well as the cities of Duarte, EI Monte, .MorrrovPia, and West Covina,
City Engineer City of Pee Gardens, CA
Served as the Cityy Engineer under a general contract to provide City !Engineer services. Responsible for all capital improvement: programs, land development, traffic engineering, water engineering and redevelopment e:nt engineering, City Engineer City of Montebello, CA
Rn•sponslble for all the city's engineering issues and projects,. including overseeing the city's engineering staff:, Also served as secretary to the Traffic Commission, preparing ail reports and projects to the Engineering Division.

City Engineer 1 City of La Puente,, CA
Directed all the city's engineering issues and projects. Responsible for the engineer's budget and all engineering staff who were iinfra.str:uc:ture Engineers employees working in City Hail. in addition, developed capital! irirprove.rent programs., approved designs, and implemented projects.
interim City Manager, Director of Public ',''arks & Planning and City Engineer I City of Ba dwin Pak, CA
Responsible for thiii direction and administration of a staff of 37.3 and budget of over $33M,. (Responsible for such achievements as; reorganization &d partirn nts, employee development program, construction of i tr;:trolirrk station, construction of 9 -acre park facility, pavement: management program, energy manage`. me.nt system, eradication &graffiiti within city; bridge rehabilitation, transit program and signal synchronization,
Director of Public r!liic orlrs and City Engineer I City of Di::rliaondBat, CA Upon the city's incorporation,. Sid was hired to set rip the p:JIDii c:tWorks Department, with responsibility for direction and supervision of all public works functions,'While with the City of (Diamond Bar, interfaced with ofci:aal office's such as City Council, City Commissions„ City Manager':s office, and other city departments and staff. Additional agency coordination included working with Caltrans, Los Angeles. County agencies, Air Quality Management District, Walnut Unified School District, and community citizens and busiiirle ses.

Infrastructure Engineers, a Bowman company I Municipal Engineering Services November9, 2023 32

Page 428 of 642 ends

Mas .ud SePahi, PE, LEER GA
City Engineer and Director of Construction Management Services Education
B.S. Civil Engineering, Loyolla
Marymouun:t University
Structural /Civil IEnginneerinq,,
t::al:ilforrnia State University, Northridge
Registrations
Professional Civil Engineer;
(.aliforrniia (;#52:7&ri
Leadership In Energy and
IEnviirornrerntall Design Green Associate
( LIE IEE.D GA)
*Experience prior talo(ning the firm
Experience
City Engineer City of Placentia, CA*
IMasauc;V"s responsibilities included management and processing of all public works encroachment permits in .addition to all other city engineering and management functions. Ivflasoud was responsible for plan check, design review, and inspections associated wiiIth: private developments throughout the city, He assisted the Director of Public Works with (preparation of the Capital Improvement Program (CIIP) budgets and monitored the expenditures in conformance with the Departments goal ,and objectives.. He managed all design and construction contracts associated with -the public works CVP program to ensure delivery of projects on time wid on budget.

Masoud supervised and .assigned work to in-house engineering, !mnaiinternance staff and consultant staff associated with OP and plan-checicirog actiivltVes.. Hk responsibilities also included negotiatirng and. enforcing design and construction contracts., cooper'atiive.agreerme=.ints, Finteractiing'with other and agencies,, license agreements, lease agreements, schedules, and work plans to en:scure projects were completed wviithin expected tiirvwelliin:es, material specifications,. and buadget He reviewed change order's, evaluated: budgets, costs, and technical feasibility.

Conducted :staff meetings with city personnel; attended meetings with other city departments., government ,agencies„ private developers, contractors, and consultants to coordinate various projects and programs. Prepared schedulles and budgets for various (projects. and assist with: preparation of the CUP and grant applications.

Reviewed and approved tract irmaps, parcel: maps,. lot -line adjustments and (provided a.dviee to the City Administrator, planning and City Council regarding engineering and administrative issues. Prepared Agenda Reports on various actions required by the City C,ouncil•. Attended: ,Ciity Council Planning Commission,Traffic Commission, and ether public meetings and made presentations on various. engineering and construction proposals, 'contracts, engineering reports, :and staff recommendations..

Laws Angeles Metropolitan Transportation Authority City of, Los Angeles, CA* As the Director of Construction Management, Masoud was responsible for the southerly portion of the Crenshaw./ L.AXT•ransit Project. This projectw.as an ti ght; and -a -half •mill u„ iir}ht rail) (lime,, which connects the Expo Line on Exposition Boulevard to the ,Metro's Green Line at the Los. Angeles International Airport. This $2B 'project consisted of eight Stations, eight aerial bridges ,over major streets and the II -40.5 Freeway. Dui ring his tenure with LA, Metro, Masoud was responsible for management of all construction on the southern segment of the project, extending from the Greenliirne :station to the outside, of City of II ngllewood.. His responsibilities included management of the entire conistu•nacti:oMIn staff, reporting to i ecuttve management an construction progress and issues in addition to interfacing with the city officials„ utility agencies,. contrac'toirs,, and designers. Also, working for Metro„ Masoud was responsible for the irrrnarnagemerrt of three major Advanced Utility Relocation Contracts as part of the Purple Lime Corridor Project. This project extended the infrastructure Engineers, a Bowman company Municipal Engineering Services I ,Navenber• 9, 2023 33

Page 429 of 642 ends

Masoud epahL, PEI LEE, •, GA
City Engineer and Director of Construction Management Services terminus 1t Wilshire./ Western westward for about nine rilile.s with seven new stations, He performed Resident Engineering for three major contracts under this $4B transit project. Responsible for all of the utility r'eIOc.at:ions at three major intersections,. La Brea and Fairfax in the City of Los Angeles. and La Ciienega at the City. of Beverly Hills..

Duties included management of construction and design staff, interaction with utility agencies, contractors, designers and city officials. The advance utility contracts paved the av';ay+'for mass e c.. waa'ti.on of the subway stations::.The relocation tion of ovrer 150 major utility lines had to be. designed and constructed; within: a very aggressive schedule to allow for the next phrases of the project to start. As the Director of Construction Manager, Masoud was responsible for delivery and relocation of major storm drain 5, sanitary sewer, electrical power lie e.s, telf'cC?I'1'137111uni4:atli43i"I, water, gas, and many other utilities, which had to be relocated within a very aggressive schedule..

MAR.R.S Services ) Fullerton, Cpl*
Principal As. the (principal for MARRS'facilitie:s, and transit divisions, Miasoud was responsible for irianaging construction management staff and multiple contracts with various public agencies.. His responsibilities included management of multiple. civil! engineering projects„ reporting to executive rmanagernertt and interaction with clients, His other responsibilities included development and irnplernentation of marketing strategies, preparation of staffing plans,, preparation and analysis of company budgets and finances in addition to interaction with existing and potential new clients. Solrrre of the major projects under his management included: LAX Crenshaw 'Transit Corridolr, A,duanced Utility Studies, I AWA Water Systems modeling, LAX 2nd Level Roadway and DEK:k Repair,. Metro On. -call bus Facility construction management, Cesar Chavez R,or.indaabout Project, LAX South Runway #rnpirnvements in addition to (many other infrastructure improvement projects.

GKK Works r th e;, CA*
As Program Director, bil.asoud was responsible for GKK` . Construction Management for various public works facility projects. Soirine of these project:, included: Police Administration Building, San Bernardino international Airport Facility Improvements l'rogram,Thiiir,.l party review kw all new developments for the inland 'Valley Development Agency I lVDA.), runway drainage studies,. conceptual design and modifications for terminal buildings, facility and site a.ssessmenit, demolition of buildings and facilities at the airport, n.i:astelr planning,. and third -party reviewer for construction of large warehouses for the IVDA. On behalf of I: 'DA, he also worked with private developers fcir development of large cargo storage and distribution centers near the airport.

Kellogg Brown and Root MDR) j A'
As the K8R.'s Construction / Design Manager for the western region, he was resporisiblefoir KB.R's projects s in the Southern California region. His duties included contract negotiations with clients and sub -consultants, managing and administering Infrastructure Engineers, a Bowman company fViitnicipaal Engineering Services I November 9, 207..3 34

Page 430 of 642 ends

Maso Sepahil. E, LEE I ,` ,i ; GA
I Is�,l
City EngneeraxedDirector&C'orkstruction ManagementServices projects in addition to managing engineering staff and sub -consultants. As the design manager for the Aair.side improvement Program (AIP) at Bush intercontinental Airport,, he was responsible for the management and supervision of the design staff and up to 100 sub -consultants, His responsibilities also included management of Imultiple design contracts to ensure compliance with the project budget and schedule in addition to the client's. guidelines and r•egullations. Provided routine project status reporting on the work performance and productivity of designers and their sulbconsultants„ File also reviewed and approved designer's invoice for compliance with provisions in the contract including minority participation requirements. He managed the design and construction of many (projects, under the AIP program
Project /Construction Manager I City of Los Angeles, CA* As a City of Los Angelles engineering staff Masoud worked on m:aany infrastructure programs and projects, some of which include the Police (Bond Program:, Los Angelles Convention Center Expansion., Torn Bradley Terminal at LAX and many other small to Ilarge mun"rcipai facility construction and renovations. iViasoud worked at the Departments of Public Works and Building and .Safety, where he was responsible for plan check activities for Public Works improvements in .addition to residential and commercial buildings. He was responsible for rexdewirng and evaluating the work. of professional and technical employees engaged in the preparation of designs, plans, specifications, estimates,, environmental studies, budgeting, schedulling and reports on major engineering projects. Supervised and directed engineering staff and activities in connection with design, construction,. maintenance, inspection, and operation of a wide variety of engineering projects. As part of the Earthquake Recovery Division, Masoud managed the recovery and renovation of buildings after the Northridge earthquake in the San Fernando Valley,
infrastructure Engineers,. a Bowman company Municipal Engineering Services ( November:47. 2023 3

Page 431 of 642 ends

D rfugll s Be ash, PEr QSP .I QS
Development Engineers OOP Manager and wt/'ater Qiic iityrEngoneer Education
B.S.. Civil Engineering, i:Ineerin.cy., Caa:liforin a State University, Pomona
Diploma in (Roads Computer Program,.

California .state to!lytechnic University,:

Pomona
Registrations
Professional Civii Engineer
California l fi39'.k5)))
Quaallified SWPPP Practitioner (9 SP)
J Qualified SWPPP Developer (QS.D);
California (,#53935 i
*Experiences prior tojoining the firm
Experience
City Engineer t (::sty of LC Palrni , CA
Douglas acted as the Cit;v Engineer at tine City of La Ifr:ainrna• for three years, :His tasks inducted reviewing design professional proposals to prepare project construction documents„ coordinating and sclheduiing with staff; managing the Capital Improvement Program, overseeing the staff management through project completion, and providing analysis of requests for information, change orders, time / material verification and project closeouts, Douglas also worked on a variety of projects including, but not limited to, street improvements; with concrete repairs arnd.AD.A improvements on I!ocat residential streets, La Palma :Avenue and. Valley View street improvements,. Community Center flooring, and engineering water welt casing improvements, Douglas coordinated with the City of Cerritos for the bridge (replacement project on La Pal!rn,a Avenue / Del Atr 1,o Avenue Coyote Creek crossing..

This project involved coordination between Orange County and Los Angeles County funding <agencies, (J'CTA., Caltirans,. and Metro.
tie provided development review to establish projects' conditions ofapp'rovat tivhil� working with the Community Development Department an multiple development projects,. inducting but not limited to, a McDonald's restaurant remodel, Center Pointe commercial development parking improvements and industrial :parking and storm water improvements, including filing of environmental documentation per CLQA. Douglas was responsible for preparing and presenting City Council staff reports and Traffic Safety Committee reports. Furthermore, he worked with staff to prepare °t; IA grant funding appli:cations for street and drain improuerrients; and documentation preparation to maintain OC.TA Measure M street improvement funding. Lastly',: Douglas worked with staff to coordinate storm drain Improvements, sewer improvements, traffic engineering services, and regulatory compliance as well as providing direct coordination with the Public Works Department staff.

City Engineer neer 1 cftr of Bell Gardeens„ CA
Responsible. for division-widde, high-level leadership,. management., supervision, and' administration of an engineering; division,. iits staff, and extended resources, Pluir , directs, ,supervises, and reviews activities of the division, including CI!P projects, land development, and databases. Works with all phases and types of municipal infrastructure projects and all (levels of personnel to see those projects through to successful completion.

City Engineer/ Deputy Director of Public Works f::i'ty of Monrovia, CA Doug managed the engineering operations for the i-'L'ty0, inclusive of budget, development, and redevelopment projects„ capital improvements, recgdecry compliance, geraeraal and itraaff c engineering, utilizing the staff to complete the priority projects of the Depaartrment:. I.n addition, he had continued ,and initiated several pr'ogiran-is to impiernuent ienvilronmenPaaal accords focusing on storm water, fk;od infrastructure Engineers,. a Bowman company i Municipal (Engineering Services November „20'23 36

Page 432 of 642 ends

D u Benash, PE, QSP "QSD
Development Engineer, OOP Manager and Wafer Quality En gineer control, I..EED building standards and utility impacts for the cirty. Doug performed general engineering duties s. for the city, including procuring design professionals to prepare 'project 'construction documents, performing pllan clh€dc services, initiating construction contract procurement procedu:res,, managing projects to completk in, providf:rncg, analysis of requests.for information, change orders, tiirrne / material.verification and project closeout., Projects included building construction and renovation„ site designs, integration of private development .mproveirrnents, heavy ,and light rail projects, street construction., street improvements, storm drain improvements, underground water and sewer improvements., including coordinating various.funding sources, regulatory compliance, and mmanag irng the engineering and fielld staffaftUne Public. Works Department. Doug had an integral (part in successful completion of these projects:
• Old Town Theater Streetscaupe improvement Project ... Project management ,and coordination with the developer to corrrplete the. street improvements with the grand ope•uning of the theater
• Skate Park Construction Piroject-- Design over;siicghtthroughu construction management arid completion:

Youth Center Construction Project - Design oversight and review through construction management and completion
• Old Twin 3Vivrtlle Streetscape Improvements - Design 'oversight and review thirough'coinstructi:on: manaagemeint and completion,. Work coordinated with an active Oki Tovvn merchant association
▪ Water and sewer utility projects,. unn,ainline replacement and capital i:Mprov'ements
Storm water regulatory compliance and program implementation Project Manager Cities of Montebello and ,t ell Gardens, CA Douglas was project manager during the. design phase and construction m:ainageir on numerous successfully completed federally and locally funded street iimprovement projects, which: included complete ADA ramp improvements at intersections with associated coordination with private property improvements., Infrastructure Engineers, a Bowman'company J Municipal Engineering Services November 9, 2023

Page 433 of 642 ends

Aid MOUsaVi, MBA, PE, . SP IQSD
Director of Design Services s and NPD&S Program Manager Education.
t; erierai,. California State
Polytechnic University, Pomona
B.S.. Civil Engineering,. Califhrniaa State
Polytechnic University, IPurorna
Registrations
Prokssiona1 civil Engineer:

California (#5111.3r6)
Qualified SWPPP Practitioner (.SP)
/ Qualified :SWPPP Developer (QSO):

California (#911.36)
Experience
Lilite Street and Eve Avenue Storm Drain Improvement 1 Oty of Lynwood CA Project Manager.. Conducted a field :investigation to identify cause of f coding issue.

Drafted a. hydrology and hydraulics report to identify 'issues and provided two s.olutionsto alleviate flooding. !Developed plans to address flooding through use of drywells arnd developed alternative plan: ; to direct connect proposed storm tarnk to existing storm draai:n main Iine,
Connector Pipe Screen (CP.S) ] City of Bell Gardens, CA Project. Vlilaanager, Conducted a field investigation ofriI1 public and private catch basins citywide, Developed a GV5 based log utilizing lw?MS4Front software..1-)eveloped plans and applied for pierrmuitti:ng through LA county to retrofit catch Ibaasins citywide by installing CPS units. Hosted pre -construction meeting with contractor, city staff and LA county,
Gertrude Drive Street improvements 0 CrtyofLynwood. CA
Project Manager. Developed plans, specifications and estimate (PS&E) package for water improvement along Gertrude Drive. Designing &irn DIP Water Main. complete with: ter:s, service lines, water meters,. water boxes, wedge ";gate valves„ transition couplings, thrust blocks, reducers etc.:PIan.s included asphalt and concrete. repairs along with plan and profile for curb anti gutter drainage.

Virginia Avenue Street Improvements I City ofLynwood CA Project Manager; Developed P'S&E package for water improvement ent along Virginia A:venue.. Designing B-un RIP Water Main complete Wcth tees,. service tines, water meters, water boxes, wedge gate valves, transition c.ouplrngs, thirst. blocks„ reducers etc.. Plans included asphalt and concrete repairs along with plan and profile for curb :and gutter drainage.

Asmu s Park Catch Bassin Evaluation and Feasibility Study Cii'.y of Bell Gaarta'ens, CA Project Manager:, Responsible for alleviating severe flooding issue at Asm us Park by identifying issues through a field investigation and a hydrology and hydraulics analysis to identify volume of water needed to divert and treat. Developed conceptual plans of dry vvefis: at parks to recharge groundwater..

Mammon Avenue Congestion Relief improvement Project City of Hu.icrrtingtea:n Park, CA
Project Manager. Responsible for hydrology arid hydraulics analysis to divert and treat runoff from two•-rnile long corridor along Stauson Avenue. Designed 1i:MIPs to treat runoff and make street into ,a green street, Ran Synchro Simulation for ten signalized intersections for LOS anatysis,, coordination and timing. Designed plans arid. specifications for signal system upgrades and street widening.

Infrastructure E.ngiiieers,.a Bowman company I Municipal Engineering Services I November 9„2023 38

Page 434 of 642 ends

Man u . Va, MBA, PE, QSIP / SD
Director of Design .Services and NPDES Program Manager
Sara: Gabriel River Bikeway Environmental Services and Permits 0 City of Bardwin Park, CA
Engineering Supervisor. Responsible for deevellop!iraq and approving SWPPIP so all pollutants and their sources, incIludiing sources of sediment associated with construction site erosion and alll other activities associated With construction activity were controlled. All discharges were identified and either eliminated, controlled or treated, BMPs selected that were effective and resulted in' the reduction or elimination of polIIt tarnits in stoirm:wateer discharges. Post -construction BMPs were identified and installed during construction that were intended to reduce or eliminate pollutants after constrl;rctuon was complete. Developed methods to implement IBMP Inspection, visual monitoring, Rain Even Action Plan (REAP) and Construction Site Monitoring Program (cSMP).,
NPOES Storm aterr Program inspection I C ifiycv&RaIdw'in Park, CA As required under the states !Regional: Water Quality Control (Board regulations and city ordinances permitting inspection 'programs, the City of Baldwin Park enlisted IE to condcrct a routine visual inspection for point -source pollution control. The goal of this inspection: was to'prevent the discharge of polllu.ttant:s associated with business activities from entering the city's storm drain system. Aidarn conducted all necessary inspections for the City of I3a'Idwirn IPair'Ik and provided the appropriate reports.

NPIDESAnnual Report Gdty Mors,tehelip, CA
Project Manager, As rnaimdated by the Trash Total Maximum Dailly Loads ('1FM..DILs) for the Los .Air gehes river waterslhed,, each city 'within the Los. Angeles River watershed is required to sa.a:bmit a compliance report for the Los Angeles F iiverr traash1FM•DL. to the Regional Water Quality Control Board. With the colllaboration of engineering, e::ode enforcev'.mein:t, building, street maintenance, 'planning and relevant contracted services,, Aldan developed the annual report for the city, identifying rinethods used to (meet cor rhpllance as well as providing calculations for scientific jsastific.aticairi,.

IWPDiES Storm Water Program Inspection City of Bapctiwin Park, CA As required under the state's Regional Water Quaallity Control (Board regulations and city ordinances permitting inspection (programs, the City of Baldwin Park enlisted:
infrastructure, Engineers to conduct a routine visual inspection for point -source pollution control. The. goal: of this inspection was to prevent the discharge of pollutants associated with business. . activities from entering tlhe city"s storm drain system. Aldan conducted all necessary inspections for the City of Baldwin Park .and provided the appropriate reports.

City Engineering NiMES Services City of Montebello„ CA
Project Manager. Managed NPDIES saervice:.s for the Cities of Montebello and Bell Gardens. Attended various meetings and coordinate with 30+ c!itiees in. the same watersheds to reach pollution reduction milestones, Responded to ail requests made from the'Waat'er Board to client cities, Handled alll IPiPi. ES--relaated work for the city.

Infrastructure Engineers, .a Bowman company I Municipal Engineering Services 0 November 9,.2023 39

Page 435 of 642 ends

Aldan is i, A,PE, 16 P"/QSD
Direr: torof Design Services and NPD:fi S Program gram Manager Coachella Gr,W:w Engineering Services„ High Hampton City of C aches l,f a, CA Designer Engineer. Designed and designated catchment areas on 1 1I --acre Iot acing g
with sizing :and slope of (pipe to divert water.. Designed retention Ibasln and dry - wells. to intercept runoff from catchment areas with intent to infiltrate the entire site's, runoff. Developed hydrology and hydraulics report to summarize findings and method for grading plans and retention basin size per Riverside County and City of Coachella Design Standards. The main objective for this project was designing :a cannabis cultivation facility with parking and right-of-way improvements.

Upgrade Water Wen No., 1 Pomp Station City ofBell Gardens, CA Engineering Sup'erviso .., Responsible for hydrology and hydraulics alnalysiis to divert and treat runoff from site., (Provided recommendations for pipe size to divert water and I M:P's to treat water: Drafted a report to include al!l analysis and recommendations. Developed a conceptual plan for the water well based on an analysis of reel ulred .storage volluroe.

Traffic Signal Improvement at Olive Street and :Phelan Avenue intersection City ofBaldwin Pork, CA
Engineering Associate, Aldan prepared a signal warrant study for the Intersection of Olive and Phelan per the city"s request. seodwarrant requirements, .AId€an had designed proposed improvements to make the intersection signalized, The improvements included pavement rehabilitation,. upgrading ramps to be ADA compliant, striping crosswalks and camera detect€on,
ATP Cycle 2, Unprotected Crosswalk Safe₹.yi. Enhancement Improvements City of r -f. un t in g tore .Park,, CA
Associate Engineer, The. city requested if to revise and complete the current plans (39 sheets), specifications and estimates which had been prepared lbyTran,sTech:.The scope included 22 intersection improvements for pedestrian accessibility and safety. 'The city also requested IE 10 obtain E76 for construction since it has only obtained Preliminary Environmental: 'Study (PES) certifrratlons from t:aitrans..'To complete the E76 process, the F?i Iht of liraray certifications and request for construction was required :before completion, this process took between 6-8 weeks after completion of the 100% PS&E documents..

Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November9 2023 4O

Page 436 of 642 ends

,; Mai:i aV, MSCE,P,
Public Works Permit Management and Inspection
Education
IVIS. Engineering, California .State
(Polytechnic University, Pomona
B.S. Civil Engineering, California State
Polytechnic University, Pomona
Regis'QtIr tions
(Professional Civil Engineer
California (#9J16%)
QSE' ,1 QSD. California (tt91696)
*'Experience prior to joining the arm
SPPOD
Experience
Slauson Avenue Congestion Relief improvement (Project 0 City of Huntington Pork, CA
(Engineering Associate. Created traffic signal modification plans for six signalized intersections. Placed video detection equipment, updated cabinets and signal equipment, installed new conduits and conductors, new traffic signal poles at the Intersections and prepared specifications and cost estimate.

TlrarflFic Signal' 'arrant Analysis on Olympic Boulevard and Allston Street l Hereford Drive Intersection City ofMon tebeiio CA
Supervising Fin.gineer. Responsible for creating the signal warirarnt report and verifying the warrant conditions satisfied on the CA • MUTCD. IDesigned a. collision diagram, conducted an analysis on the collision history of the intersection and provided a field review of the existing conditions.

Engineering and. Traffic Survey City oafMontebello, CA
Super Vising Engineer. Updated the engineering and traffic survey to determine the posted speed limits throughout the city Conducted a field investigation, analyze SWIITRS data, create spend survey maps, analyze tlhe speed and traffic data in accordance with the CVC code, and prepare a fiinal report.

Pavement Management System (PMS) Update Report City of, Montebello, CA Supervising Engineer,. Responsible for inspecting and creating an inventory of the conditions within the City of Montebello°s roadway network. Work included generating excel inventory, creating a GIS map and database, preparing a five-year budget to raise the overall pavement condition index within the city, and creating a comprehensive report,
Ail"`, ay Stop Warrants at 6th Street. aarndWest Harding Avenue I CityofMc nt.ebeilo, CA
Supervising Engineer. Responsible for creating the ail -way stop warrant report and verifying the warrant conditions satisfied on the CA-M.UTCD. Designed a coilks,iion diagram, conducted an analysis on the collision history of the intersection, and provided a field review of the existing conditions.

Corridor Traaffic. Study Along Lincoln Avenue lletwr en Wilcox Avenue aind Montebello f ullevanrd I City of Montebello, CA
Engineering Associate Prepared a traffic calming report throughout the Lincoln corridor. AirnaIIyze the existing peak hour intersection capacity and parking capacity, review three-year collision history and intersection sight distance, evaluate vehicular speeds and calming measures, prepare future capacity analysis with conceptual roundabout design, and determine the future capar„it:y of on -street parking. infrastructure Engineers, rs, a Bowman company i Municipal Engineering ServicesNommnber 9,.2023 41

Page 437 of 642 ends

Shy i .lsa M E PE, QSP QSD
Public Works Permit Manageftlent and f s ection
All Way Stop Sian liVarrant Analysis 4th Street and Mines Avenue Cray of Montsr_rhello, C
Engineering Assistant, Responsible for creating the Ell: -way stop warrant report and verifying the warrant conditions satisfied on the CA-NVVJTcD:: Designed a collision diagram,:coriduecte.si an analysis on the collision history of the intersection and provided a field review of the existing conditions,
kiSIP Cycle 7 Project -Variocrs intersections Improvements j City of Montebello,. CA Engineering Assistant, Upgrades the signal hardware and improve signal timing for the three intrvrsections..Thi!s included changing the phase diagram to protective - permissive and relocating existing Ik-rails to irnprove traffic flow .and 'safety.

Responsible for the design„ specification,. and cost estimate of the three traffic signal intersections.

Beverly Blvd Street Improvements Project 0'ay of Montebello, o, CA 'Engineering Assistant. Respon.sible for preparing plains, specification, and cost estimates. Specific work included detailed field observations, design of necessary streeet improvements, urriplemen:tirig Ai:: pavement and sidewalk repairs„ updating ramps to become ADA compliant and maximizing use of federal funds..

Arroyo Drive Street improvements IH:':rtyrofMontebello, G4 Engineering Assistant, Responsible for developing street. cross section and base neap; performed field reconnaissance to inspect M1a.rud v'e.rhfy surface indications cif utilities.. infrastructure Engineers provided design, project management,: bidding of co•:ntract:, construction management and inspection, as well as federal fund administration for this project that '€ravo ves removal of existing AC paving and paving of AC pavement and concrete improvement reconstruction, including replacing existing c.u!rh anal gutter, sidewalk, driveway approaches,. access ramps, and adjustment. of utility covers, traffic striping„ markers,'pavement markings end curb painting. The project runs from Arroyo Drive from Astra Drive to Rose Glen Ave.
infrastructure Engineers, a Bowman caarnpa y l Municipals Engineering Services 11vtoeemtaer 9.202.E 42

Page 438 of 642 ends

ike gheri,TExP
As -Needed 'Traffic Engineer
Education
Master of Publlic. Sector Management
Leadership, California State University,
Northridge
B.S. Cavil Engiineeri!ng,, II i wa State
University
Registrations
Professional Traffic Engineer:

California (#.1663)
Professional Civil Engineer;
California (#470.34)
Associations
Past Metro Sust,aiinalbiiity Council
Member
Past 'Metro TDM & Sustainabili!ty.

Committee Chair - 2019
Past Metro Transportation Advisory
Committee Member 2019
instituted Translportation'Engineers
(iT1E) ner€ber
Awards
.2015 APA Outstanding Transportation
P€a!nnii.ng Project, Measuring Mobility
in Pasadena beyond Auto LOS
2009 APA Planning Excellence for
Best !Practice, the Next Downtown, a
Sustainable Vision for ;Downtown !Lens
Angeles
peeri'cnceprio.r:t jcrxrning the firm
Experience
CityIreflic Engineer City of Montebello,, CA
As a member of infrastructure Engineers„ a Bowman company Foulke serves as the CutyTraffk Engineer for the City of Montebello. He managers doe dailly ,activities of the Traffic Engineering Division. In thus capacity, he is responsible for developing and managing the annual traffic division budget, securing federal funding from Caltr'ans for city projects, supervising the design and construction upgrade of the new traffic signals, and managing projects for !major arterials in the city. In addition, he is responsible for reviewing traffic signal operations and new system design projects, overseeing the preparation of PS&E'furr new traffic:: signals and striping plans, developing new signal timing, reviewing traffic impac t studies arid scopes of work prepared by consultants, and plain checking traffic control plans.

Transportation Manager City ofP scdenax, CA'
Transportation Managrnr. Mike planned, organized, and directed th'e activities of the City of Pasadena Transportation Planning and Development aiwisiion in.clluding but not limited to: CiP; €Me°tro Caill for Projects, SAG, and SCAQMDD sustainable transportation grant projects, development review process, and VMT / VT transportation impact aria€yses using city's transportation forecasting model.

Administered c€ty"s Trip Reduction Ordinance (TIRO), and 'Transportation! Demand Management (TDM) plan„ Worked closely wiith the Manning Department and City Attorney's Office in preparing (Draft Environmental impact Reports (DEER.), and formulation of traffic -related "'Response to (DEIIR) commnents"Represernted the department at City Council, public meetings, city commissions / committees such as Planning Cormmissiion, Design r;."onxrnis:sion, and Transportation and Environmental Advisory Commission. Manned and prepared division's budget Department a:rfTransportation, , 't u 1 u of Planning and Land Use Development t 0 City of Los Angeles, C4
'Transportation Engineer. Mike r•naruaged and supervised a tear s ofengineering staff re.slpornsibie for review of traffic studies / Environmental Impact Reports (IEUR;).

Participated and interacted with developers arid city officials in developing creative and practical solutions J!ir•nprovexnents to mitigate project-rellatt:ed traffic impacts,.

As point person, Mike coordinated site access and +ci.rcullration design issues. for 100 LAUSQ's, new schools iii the Central, Southern and Hollywood areas with other department bureaus and other city agencies. He also prepared and submitted MTA.

Ceti for Project applications, and rrnarnaged Call projects for LADOT.

Department of Transportation, Bureau of information Services City of Leas Ange,ie% .CA
Transportation Engineer, Millie managed and supervised a tesam of engineering :staff responsible for review of traffic studies / EUft:s. Headed the Systems Development and Traffic Surveys Sections responsible for develolpmnent of Geographic Information Infrastructure Engineers, a Bowman company I Municipal Engineering Services 0 November 9, 20.3 43

Page 439 of 642 ends

Mike Bagher,'T
As -Needed' Traffic Engineer
Et PE
Systems (GIS- based ,applications to streamline department operations. Issued 1Request. for Proposals (Fir Ps) and managed the: department's Traffic Accident Information System (MIS) project. Secured funds .from the Quaky and Productivity Commission's Productivity IIn:vesrtment. Fund to develop c epaartinernt Work Order Tracking System (\ OT,.S,i.

Department of Transportation, arureau off Transportation Planning City of Los Angeles, G4
Transportation Engineer, Managed and su:pentise•d a team of engineering staff responsible for review of traffic studies /• EIIRs, Managed and directed staff responsible for collecting, analyzing, and disseminating traffic data iin support of the entire department, Planned :and implemented a computer system for direct access to traffic data, Converted Section's business process to arnrnO!'-a'r 90% paperless operation, 'rested .and evaluated n:ewdaataa collection systems for the Section resulting in acquiring more efficient data collection equipment (i:.e,, Nir!nnetric and Jaymar:l..Appoiunted by the Gene!r.ail Manager as the departiment GIS c:oordinatob Trained rnore than 700 DOT staff in using and applying GIS technology in their daily work. In -iuiy 1995, prepared a technical report to plan and implement a department wide GIS-based work (:order:system, Conducted department -wide 1tA.l'� / GIS needs assessment :survey and convened coordination meetings with representatives of all bureaus in the department.

Department off Transportation, -Bureau of Transportation Planning 1 CO of Los Angeles, CA
T-ran.sportation Engineering Associate. Reviewed and analyzed traffic impact studies for rrew development's in the city to ensure compii,ance with adopted transportation ordinances and DrOT. guidelines.. Evaluated adequacy of proposed measures to mitigate traffic impacts on the city's transportation system, Worked closely with Council offices,
Department t tnfTransportation, Office of Transportation Operations s't an Fernando Vaifeyr Offices I City of Los Angeles CA.*
Transportation Engineering A.s:socrate. Reviewed and approved traffic engineering s,l'rudies conducted by staff to install„ remove,. or modify train control devices on city streets, Recommended removal and / or installation of signs including parking signs, Worked cl sely •smith City Council offices, !AFT., ,and other city a€tencies.. Received appreciation p aciue from Council District 12 for outstanding work. infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9, 2023 44

Page 440 of 642 ends

Water Engineer
,education
B.S. Mechanic& l ngineerinq,, California
State University,. Los Arngeies
Certifications
Grade 5, Water Distrilbu:tuori Operator
(State Water Resources Control i Board)
Grade 4, Water Distribution Operator
(State Water Resources Control i Board)
*&nperierrnceprior .to joining the farm
Experience
Infrastructure a ru araa er , a Bowman company I ,Br"ea, CA Water System Consultant. While employed by IIE , Jose has (provided the ser'vices to the City of Bell 111 Gardens,Thus includes oversight on the determination: of PIF;A.S contamination and anally+sis of an existing water well,. WWorkcE d on a water quality improvement engineering study of the city's drinking water systerni. Assisted with the selection of the best; available technology for PFAS treatment of a water well, Assisted with the water blending analysis of an existing water weill and !MWO water for PEAS treatment., oversaw the dynamic: flow and chemistry profiling done drir•niking water wuaellll. Oversaw the static and dynamic video camera survey of one drinking water well Oversaw the rehabilitation .and modification of one drinking water welll.Also,for 'the.

City of Gierndor,a, lose updated the water system cross -connection control program and prepared the city's annual water system report for the State Water Resources Cont:roll (Board.
a na Engineering & Cornrsu itirng I Bermuda Dunes, CA"
Water System Consultant, While: consulting for'Safna Engineering & Consulting, Jose provided many services to t:he Los Angeles County Department of Public Works Satirvz Los Angeles County Water !Diistric:t..Jose served as the State Certified Chief Operator of (Record and managed the dailly operations and maintenance of the water system. IDirected tlhe operation of pumps, chemical dosage rates for wellhead, distribution residual maintenance, related flow, pressure control and storage facilities by using a System Control and Data Acquisition System (SCADA). Coordinated and oversaw the collection and analysis of various types of water samples from the water system ,according to procedures provided by the State Water Resources Control Board. (Reported and communicated both verbally and in writing with the State Water Resources Control Board pertaining to reIporting test results, production data, cross connection control corrective actions, and annual inspection of all facilities.

Prepared and submitted rn•ronthVyr, quarterly, ,and yearly water quality reports to the State Water Resources Control Board,. Ensured compliance witlh federal, state, and county health and safety regulations,. Prepared and oversaw the water system valve exercising program, Prepared and administered the water system flushing program„ Supported they county's team 'with the water system infrastructure design. Supported tlhe (Los Angeles County's team and contractors with the construction of new water. mains and repairs of the existing water syrstern, Oversaw the removal, rehabilitation, reinstallation, disinfecting. and testing of dorne:stic water well:s. Supported the county's team with the construction of new back-up water supplies with adjacent water purveyors. Assisted the county's team with the updating of th.e water systerrr emergency response plan and emergency chlorination plan. Oversaw the updating of the risk management plan for two chlorine gas systems. Oversaw the conversion of two chlorination: gas systems to two :sodium':.hypoc.Ihforite chlorination systenrrs.

Assisted with the preparation of the annual consumer confidence report . Oversaw infrastructure f ngineers., a Bowman company
Municipal Engineering Services November
,4;

Page 441 of 642 ends

jose A. Molina
Water Engineer
the installation of a SCAI[)A. Oversaw the rehabilitation of two h:ydreapn!eumaatic tanks, Assisted with the u.ipdating of the water system map,
'Waterworks 'Tehnology, km. Los Angeles, CA
Water System Consultant. While consulting for Waterworks Technology, ology,'inc., Jose provided many Ser"vtCes to the City of Lynwood Water Department, Jose LISSiSte.d with the operaxidar-r jai pumps, chemical dosage rates for wellhead, distribution residual maintenance, related flow, pressure control and storage facilities by using a `.iCA.DA system. Oversaw the removal, rehabilitation, reinstallation,. disinfecting and testiing of domestic water yells„ Supported the city's team and contractors with the construction of new water mains and repairs of the existing water system.. Assisted with the preparation of plans and specifications for the rehabilitation of three water wells. Worked as project manager and inspector during the rehabilitation of three water wells.. fieviewed pllans and specifications for the construction of a new.water well:,. Reviewed plans and specifications for the construction of a well treatment plunt for the removal of IPCE and TC.E.. Reviewed playas and specifications for the installation of a new SCADA system.

Utility Service's Manager I [:i yofLy nvoor, CA*
During his tenure in this position for the City of Lynwood, Jose Ve5aW the preparation of the Sewer System Master Plan and Sewer System Management Plane.

Planned, organized, and exercised direct supervision overspecialized crews and equipment performing preventive and reactive maintenance to the wastewater collection system. Evaluated and managed maintenance programs to ensure efficiencies and quality standards were maximized, including: dosed circuit tela?'vision piipe inspection program, nigh velocity hydraulic pressure cleaning programs, root removal programs,. construction and repair of wastewater manholes and mainlines, Developed and coordinated ongoing, on the):olb training, vendor and in-house training for ail wastewater work tasks, fleviewed accident hazard reports and recommended corrective action. Oversaw emergency response and cleanup in the event of a sanitary sewer overflow or 1YU11"i't discharge, documenting investigative findings and :reporting to regulatory agencies as required. Evaluated and monitored the status and condition of wastewater infrastructure and equipment, recommending capital replacements and improvements. (Reviewed new development plziiras and specifications for corinpliance with iity s standards., Jose supervised, directed and. assigned duties to production personnel, Oversaw personnel activities, assured proper and adequate training, and managed their peirforrna:nce as needed through regular performance. evaluations and coaching, Coordinated and oversaw the collection and analysis of various types of water samples from the water system according to procedures provided by'the State Water Resources Control (Board, Oversaw the investigation and answering of campliarnts to Customers concerning water qualiity. Reported and communicated both verbally and in writing with the State?, Water (Resources Control Iho.ard pertaining to reporting test results, production Infrastructure Engineers, a (Bowman: company 1 Municipal 'Engineering .Services i November 9.2023 46

Page 442 of 642 ends

Jos A.

Water Engineer
i;"' a
data,, cross connection controll corrective actions and annual inspection of all facilities.

Oversaw cross -connection control program. Inspected production facilities to ensure compliance with sanitary standards. Oversaw the pulling. resetting, rehabiiitation, disinfecting and testing of dormestic water wells, (Directed the operation of'puinnp s, chemical dosage rater for wellhead, distribution residual maintenance, related dines, pressure control and storage facilities manuailly or by using a'y;'C:A[)A system. Oversaw troublleshootine „mainter•rance, and improvements of SCADA system., Prepared specifications and cost estimates for capital improvement projects. Oversaw the design and construction of new water facilities and new treatment facility. Oversaw the preparation of the annual consumer confidence report. Ensured compliance with federal, state, and county health: and safety regulations, Prepared !budget for the operation, maintenance and capital improvement projects, Oversaw the emergency response team. Coordinated the preparation of design and construction pans with engineering staff Insured the proper development and administration of work safety programs. Made recommendations on ionq-range capital improvement projects„ Oversaw the rehabilitation of five water wells and the abandonment of seven water wells. Oversaw the preparation of plans and specifications for the improvement of five water weft sites and the installation: of five electrieat back-up generators. Oversaw the preparation of plans and specifications for tlhe SCADA of the water system.

Oversaw the preparation o f Water Master Pains and Water Management (flans, Oversaw the preparation of the bio•terrorism vu.ulnerabiiVity assessment for the water distribution system..

Assistant Director ofPublic ' !arks / Utility Services ; Criityofty+nwo©d„ CA* .lose admiinisteared departmental activities in the absence of the [Director of Public Works. Represented the Public Works Department with residents and community groups as it related to the city's water, sewer, street lighting and traffic signal systems:, Provided general administrative, budgetary, engineering and management assistance to the Director of Public Works. Attended City Council nneetiruy:s and met with the public as needed. Supervised and conferred wwtth the utility division supervisors concerning the planning, sclhe?:duling, and assigning of operation, maintenance, repair.ar-rd construction functions of the water, sewer; street: lighting and traffic signal! systems. Coordinated the preparation of design and construction plans with engineering staff, Made recommendations on (bong -range capital improvement projects. Oversaw the development,. training and evaluation of unit person.ne€. insured the proper development and administration of work safety programs, infrastructures Engineers:, a Bowman company I Municipal Engineering Services l November .9,.2.023 47

Page 443 of 642 ends

Jay Shih, PE, CASp
Certified Access _Special'istand k"ntit11errmt"nib` Review Education
R.S. Ma}oir, Concentration., University or
Institution Narn•e
Registrations
Professional Engineer Virginia
(#032:887), West Virginia (:#22353)
Structural Engineer:. IL(#032887)
Certifications
Registration Boards (CLARl3)
Certification
LEED AP BD±C
A.ss
cisations
NAlOP Northern theirn Virginal
Urban Land Institute {1„ILU)
Loudoun County Chamber of
Commerce; Board of Directors i :r'EJ''V 1-
2018), Executive COMM ittee (2017--
20'18)
*Experience pr'ccar 1o. joininq the friar
Experience
Certified Access Specialist (C p) Plans Examiner„ Inspector and Instructor N City of Corona, CA
Checks ADA improvement plans for the City of Corona including 36 city parks rest rooms, handicap parking, and playgro:ur ds. Ilnspects various existing city facilities for A.Dr4. compliance and make recommendations on required .imp.rovements Provides inspection and certification for completed improvements, including final walk-through and punch fist creation. Provider design consultation and plan review services, froinr design.through oc:rrastructi')n documents. Prepares and provides appropriate training materials for engineering staff,: including major updates to t=ederai and Caal!ifornia ADA codies. Provides technical expert is s and expert witness testi rrion:y as needed.

Infrastructure c Lure Engineers, a Bowman companyl. ! era', 0 Principal of Building & Safety.. Directs and supervises professional and technical staff; prepares building and. engineering proposals in response to T IFF':s and RE'Qs; makes hiring and disciplinary r:Veicisigns; identifies training needs avr=.rsees plan check, permitting, and inspection; negotiates, administers, and monitors contracts and agreements, Provides effective leadership with the building and engineering departments to achieve project requirements, elnt:s, meets deadlines, satisfies customer and client needs, ensures safe operations.„ and meets profitability targets. Manages all aspect of building and engineering plan check, building and engineering inspection.

Provides building standards cede, stormwater, and low impact development tra€ning to staff Checks complex st.rijctural, architectural,. disabled access, land development„ and public improvement playa's.

City Engineer Cities ofAr'tesi:a and Baldwin Pcrr'k, CA Directed and administered all! activities of the Engineering Department, including planning, designing,. and directing construction and maintenance of streets, bridges, pipelines, waater and sewer systerras. Managed capital improvement projects, reviewed designs completed by consi: ftant:s.'Monlitor satornnxvater discharge M.S4, construction activities, aind industrial activities into the city's storm drain system for compliance with INIP'D!ES Permit requirements. Reviewed and approved publlic improvement and land development plane prepared by private engineers, directed counter technicians to issue encroachment permits and grading permits,. calculated grading bonds, coordinated inspection and acceptance of such work.

Building $ fcda! p Cities of Huntington Park, ilig n tebelio ci.o'r.d Baldwin Park Provicled counter plan check and bull ding code consultations checked resi:cientuai and commercial plans„ including mechanical, electric;al and plumbing) checked grading, drainage, low smpa+ t development, erosion s:antrol andlIVOIVIP pians;; reviews soil., compaction, hydrology analyses ,and SUSMP reports; provided input to Planning:

Dittpartrrrnent'in the drafting of Conditional Use Permits;: coordinated with City infrastructure Engineers,. a Bowman company ltrluanicipal Engineering Services November 9,. 2023 48

Page 444 of 642 ends

jay Shit, PE, CASp
Certified Access Specialist and Entitlement Review
Engineers in the review c:rf tentative and final tract maps, parcel maps for lot spplit, and lot merger in compliance with the Subdivision Map Act.

Building Official and Principal Plain Check Engineer I Cities of Rosemead and La Puente, CA
Provided counter plain check and building code consultation; checlk.ed residerrtiall and commercial plans, including mechanic:,ad, ellectricai and pllu.umbirig, checked grading, drainage, low impact development, erosion control .and WQMF Ipdans; reviewed soil:, compaction, hydrology analyses and SUS.MP reports; (provided input try IPdanning Department in: the drafting of Conditional Use Permits; coordinates with: Ciity Engineers in tyre review of tentative and final tract malps, parcel maps for lot split and lot merger in compliance with the Subdivision Map Act,
Senior Plan Check Engineer I Cities of Baldwin Park and Htrnrangtcw Park, CA Provided counter plain. check and building code consultation for the b uMing departments. Checked residential and commercial plans, incd'udiing mechanical, ekectricaLancl plumbing. checked boundary., topographic„ ALTA surveys, grading, drainage,, low impact development, erosion control: and WQMF (plans.

Community Redevelopment Agency I City of Las Angeles CA', [:director of Engineering Department operations in: revitalizing blighted communities within the city„ Managed the design and construction: of kipper .2nd Street Bridge which connects the old downtown Los Angeles with Grand Ave. Oversaw staff' construction managers and inspectors in managing construction contracts, Checked tenant improvement, (building rehabilitation, and public works improvement plants prepared by staff engineers and consultants prior to advertising and bidding construction projects. Pmaviicted construction management services for a new 8,64E SF Community Center. Project includes a !kitchen, multipurpose rooms, administration offices, reAro ens, game (room, concession room,, landscaping, irrigation, site walls, site righting, and paaving.The building is utilizing a dual plumbed system, and time site is using reclaimed water for irrigation."€'hi project has required cllose coordination with: SCE, IRRWQCIU,: and Los .Angeles County Department of Public Health, Department of Public Wr ks F City afLo.s Angeles, CA*
OW Engineer. Designed seismic retrofits to strengthen the city's e.Irnrei!nforced masonry buildings. Managed construction of public improvements including grade separation, bulkheads, trulnkline s, tilt ups, and vva:stewater treatment plants. Checked subdivision reaps and metes and bounds (legal descriptions. Designed retaining wails and concrete (bulkheads. Prepared public improvement plans including sidewalks, sewers and storm drains. (Performed construction management of public improvements,
Infrastructure Engineers, a Bowman company I Municipal Engineering:Serwrices !November 9 2023 49

Page 445 of 642 ends

Media Durand
CEQA Manager
Education
as. EnvirorimentaaI Science,: San Diego
State :University
Certificati ns
Certified Inspector of Sediment and
Erosion 'Control In -Training f,CISEC•-Jfl
liver te lice prior to jilir .k q the firm'
Experience
Infrastructure Engineers, as Bowman n company} Brea; CA Director cif Environrnaentai and Planning Services. lt,Ralia Is one of tEE.'s rrnurlfi-faceted planners with an Innate ability to effectively. Interact with clients and tlhe public to ar'riv'e at positive results when managing projects and staff. 2023-2031 Housing irna Element Update II Otyof Wr sco, CA Project .Manager, 1E was hired to prepare the 2€t2;3-2031 !Housing Element and associated CEQA Exemption for the City ofWasco., M!aliia is the Project Manager orsn this project..
.2023-2031 Housing Element Updante fi Citycrf Shofiter, CA Project Manager, IIE was hired to prepare the 1023.2(3.31 Housing Element and the associated iCE'QA IS/ MND for the City of S1 -!after. Malin is the Project Manager on this project.
2021-.2029 + Housing Element U date p Ory ofAdeiontq,, C'4 Project Manager. IE Is providing staffing and technical support for land use and environmental planning projects including the preparation of the 2021-2029 Housing Element and associated CEQA IS / MND for the. City of Adelanto. Mxr:Via. is the Project 'Manager on this project..
2fh21-2012'9 Housing EI'emenrt Update I C7ty of .L nvvoat CA Project Manager. IE prepared the 2021-2029 Housing Elenr rt and the Fmociaated CEQA 1S / WIND for tlhe City of Lynwood. Melia Is the Project Manager on tlhi:s pnrrject:. (EDA Consulting sting Services City of Norwalk: CA
Project. Manager, IE was selected to provide CEQA / Pla.nnrira:g Consulting Services to the City of Norwalk by performing peer reviews of various documents pertaining to the Norwalk Entertainment Di!str1ct-C:.ivlc Center Specific Plan Project. Malin utilizes her experience with environmental doclirent development and review to serve as the Project Manager nager anrd Senior Environmental Planner for this pr'o[ect: I.E provided as review of t:he Environmental Impact Report (ER and Specific Plan on behalf of and working closely alongside the city.

County of an Diego Department of Puablk +` orks [ Cnr..rrtyof.5orr Diego,. C/A* Land t.Dse,:and Environmental Planner. Mafia was respo•r>s blefor!nan,ag:4!rsg't:he environmental,processing of public works Capital Improvement Projects 1CIIPI, from concept through construction and final mitigation sigin-•off. Sotne example projects included road improvements, bridge rehabilitation and construction, stood control faag_iiltie s, dump rerrnediati!on and corn piex emergency repair projects, AJlalia ilsras responsible for criticrall negotiations with local, state, and federal: resource agency representatives for all permitting and cornpe nsato.ry mitigation associated with imparts to sensitive habitat, jurisdictional resources and lasted species.. Performed infrastructure IEngine.ers, a Bowman company Mtiniic:Ipall Engineering Services I November 9, .2023 5O

Page 446 of 642 ends

Kalb D'i rand
CEQA Manager
environmental code compliance, violation resolution, environmental r•emediiation and maintained up-to-date knowledge of environmental laws, regulations and policy governing both public and private development. Malta has extensive experience presenting to members of the public, stakeholder groups, community planning groups, and representatives of state and federal regulatory agencies, Melia spearheaded the development of numerous technological advances for essential county -wide programs, resulting in substantial labor and cost savings,.

San Diego Reggionai Water Quality Control Board, Core Regulatory Unit !Son Diego, [A*
Student Assistant. Provided the time management and organizational skills necessary to perform multiple complex tasks independently or when working closely with others. Contributed her extensive knowledge and use of the statewide database, CLINGS,. as well as a general knowledge and understanding of numerous other databases used at the Regional Board. Exhibited resourcefulness and good judgment while evaluating individual projects and reviewing annual municipality submittals.

Technology Associates international Corporation (TAllC) I Son Diego, CA* Biologist. Performed tasks involving environmental, species, (habitat, construction and mitigation compliance monitoring. Gained strong environmental law and policy understanding and application In the field and in technical report write-ups,.

Infrastructure Engineers, a lawman company l IVlunicipai Engineering Services I November 9„ 20023

Page 447 of 642 ends

Arian M. ld ni,
Construction Manager.

Education
KS, Civil Engineering, California State
university, Bran ..lose
£3.S.. Civil Engineering, California State
Polytechnic University, Pomona
*Eir'pea',i,ence prior tojoining the firm
SCE
Arjan Idnani worked on major infrastructure projects and on public works improvement and rehabilitation protects throughout California. His experience includes work or'1 lane) development projects,, capital irnprovearrnent projects, construction management, project management,: and administration. A,rjanrs experience Iliso includes street improvement project's, water main line r'eplacernent's, slurry seal improvements, traffic signal improvements,: and sa.nitary sewer improvements in cities of Dell Gardens, l',/lontelbell!o, Baldwin Park, South Gate,..and South El Molnte,
Experience
Construction of :a5't Street Enhancement Project E City of"Huntington Park Chi Project Manager. project consisted of trenching, pipe lanyout,, bac.kfiilllnq, pipe abandonment pipe lining, demolition of existing improvements, relocation of utrlrtl:esr,, construction of concrete improvements like sidewalks, curb and gutter's, curb ramps,,: driveways., cold mulling, concrete and asphalt paving, and placement and connection of traffc si,gnai equipment.

Construction of Arousal:' treet Rehabilitation Project Phase :E I City ofG rnptcan, CA
Project Manager. This project consisted oof edge milling of existing pavement, 4 in of cold -in -place- recyclin tCiFt),: material testing, 1--3 r';2 in to 2 in asphalt fibber hot niix lA:ftf-l:ltrt'I overlays: removal and reconstruction of damaagcid PCC sidewalks, curbs and gutters, cross gutters., local depressions, ssiolras, driveway approaches, =addled Medians, future irrigation conduit installation, ADA curb ramps; O.rtullity+adjustments,. reconnecting existing curb drains, installation crf new water :riveter, traffic loop replacement, replace. traffic. signing,, thermoplastic stripling and pavement markings; and traffic control and other associate elements of work,
Construction of Urban Bicycle (Project City of Lynwood CA:

Project Manager: This project included the construction of HMA Bike Path, curb and gutters, curb ramps, retaining walls., concrete Poles., concrete box culverts, chain link fence, permeable pavers:, installation of removable bollards, gate's, main waterline, irrigation, install trees and shrubs, mulch, install single and dual ARM Pedestrian, lighting poles and liurninaire, furnish) and instarti way finding and interpretive signs.„ bicycle racks, fountains, and striping.

Construction of Central! Park West City of Baldwin Pork, CA Project Manaceller.. This project included the construction of irrigation System and Landscaping, security lighting system, improvement of park area, construction of Irestroor n / storage are:a, installation of storm drain, sewer and domestic water system, construction of playground area and tot tot areas with playground e„quiprra.ent, construction of volleyball and basketball courts and: installation of bicycle rack, shade structures, I3BQ's, picnic tables and drinking foountain s. infrastructure Engineers,. a Bowman n company I Munic,iipall Engineering Services November 9,.202
52

Page 448 of 642 ends

Arja kin,.

Construction Manager
E
Cdwil Engineer p City ofSouth EiA/fonte. CA
Allan operated ass permitting engineer for the city, issuing building permits and conducting inspections for permits and of -site improvements for buildings. and !tract maps. He wrote and reviewed RFPs and provided 'project management staff reports for City Council meetings. Some projects he was involved with included the pool plaster project (including removal of existing plaster„ tiles„ and railings and installing new piaster and tiles and railings); skate park construction (including removal of existing curb and gutter, sidewalk, and benches, and construction of curb ant gutter, sidewalk, ramp,. drain: and trellis); and Farmer Avenue Patch project,. which included mnn:ovai of existing pavement, compacting existing base rock, and installing 21i -in asphalt.

Santa Mita'Traffic Signal Modification I airy ofSouth El Monte, CA Construction Manager. This project included installation of new traffic signal poles, a new equipment calbirnet,, and a video camera and removiing and replacing accc:ess rauvnp.s and striping.

Construction Manager 11 City of Montebeito, CA
Bluff Road Improvements. This project included cold milling existing 2 -inch - deep ,asphallt a!rnd. iin.st;ralling 2 -in of aslpinatt overlay' along Bluff IRoaef, in addition, construction of new curb arid: gutters, sidewalk and driveways and access ramps were performed as well as installing traffic loops and striping.

Via Cornpo improvements.. This project included cold milling 'existing 3 -in - deep asphalt and installing 3 -in of asphalt overlay. Also removed and replaced damaged curbs and gutters, sidewalks, and driveways, and installed traffic loops and striped,
Beverly Boulevard Ilmlprovemenits.This federally funded project included cold r-nilllliiurg ,ex'i:sti:ng :3 -in -deep asphalt and installing an overlay of 3 -in of asphalt, removing and replacing 'damaged curbs and gutters, ,sidewalk, and driveway, and access rairnnps; pruned trees, installed traffic loops, raised manholes, striped and constructed bus pads.

Flotilla Avenue improvements, This project included :replacement of damaged t2 -in clay sewer pipe ii!n.several locations ;as weill as cold Muting existing 2 -in - deep asphalt and installing an overlay of 2 in of asphalt.. Removed and replaced darnaged curbs and gutters,. sidewalk driveways, and access ramps. Raised manholes, installed traffic loops; and striped.

Garfield Avenue Ilmprcwernents.This project included cold milling existing 3•irn deep asphalt and installing an overlay of 3 in of asphalt, rern.ovirng, and replacing damaged curbs and gutters, sidewalks, ,and drir;Y,eways, and access ramps.

Constructed bas pads, installed traffic loops, and striped. infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9,..2023 53

Page 449 of 642 ends

Adds M Id E
Coast uction Manager
Safe Routes to School. This project included installation of speed signs, lighting crosswalks in pavement, hatched striping of cross. walks,. and construction of speed bumps and access ramps.

Emergency Vehicle Preemption Project V City ofSu l Gardesns,. CA Construction Manager, Provided construction management and inspection .of i:nst.allatio!r, of Opticorrn detectors, Opt'scorn controller equipment, connecting• Opt±com controller equipment to Opticorn: detectors and removal of the existing conduit and replacement with new conc:lui:t:s.'The improvements were conducted at six intersections.

New Traffic:Signal at the Intersection of Garfield a venue and Madison Avenue City of Montebello, CA
Construction Manager. Provided construction management and inspectl!ort for this project that included installation iof a new traffic signal at the intersection of Garfield Avenue and I'"+iadisora Avenue, Work was comprised of alli the associated equipment and electrical components video vehicle detection system,. LED systems, cabinets), painting of curb, traffic striping of the roadway, installation of markers and roadway inarking:s, and all other required equipment to ensure the proper and intended operation,
installation of Bu; Shelters City of: cavvrvii:an Gardens, CA Construction Manager. This project included construction of new bus shelters. along Carson Street. and Pioneer lBoulevard,. i!nsta0ati!can: of solar lights, inst:alilatioii of decorative trash, cans and benches at new and existing bus stops and painting existing bus stops.

Construction of Ramona Boulevard City of Baldwin Park, CA Construction Manager. This project included constr€.action of new bus shelters along Carson Street and Pioneer Boulevard, installation ofsotar.lighits, installation of decorative trash cans and benches at new and existing bus stops and painting existing bus ,toles,
Widening of Kauffman Avenue arid Dorothy Avenue; Construction of Firestone Median I City of SouthGate, CA
Construction Manager.This project included excavation of 10 in of existing street and installing 6 in of aggregate (rase and 4 in of asphalt. Removed and replaced curbs and gutters, sidewalks, and driveways and constructed access ramps. Also installed 4tfeetiigF!ts, a new 12 -in ioate!r !main, water servi:ci. 5 hydrants, and con.stru,rcted new storm drains and catch basins.. Constructed a median island on Firestone Boulevard and installed an irrigation system and landscaping,
Infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9, 2023 54

Page 450 of 642 ends

Miff T'
yp Haffar, EIT
�i n.spe�. d. of
Education
B.S. Civil Engineering, University of
Texas at Arlington
Registt'atJflS
Engineer -in -Training (EFT): CaViifoirrnia
(#XEQ&O.5.:35)
*Experience prior to joining the ,farm
Attif Haffar has over 30 years of diversified experience in the field of construction inspection, construction manaagement, civil) engineering„ water resources, and transportation Attif has worked in the civil design of solar and wind farm projects, master planning for drainage facilities, ;storm drain, reiguonial detention basins, hydroVogy and hydraulic ainallysi.s aired water -quality studies, by utilizing ILA Metro,, Port of (Long (Beach, and OCTA, Metro link, li:CT•C,, S3CTA, SANDAG aind Ilocall municipalities, Attif has designed urban highways .and streets using Cal:t:rarrs:Standa.rd and Specifications. He has ,also performed construction management by establishing the project execution pllari, heallth and: safety (plan,, quality. assurance / quality control Ipiaan, .and construction phase coordination, as weld as overseeing the design aind resolving various issues.

Experience
:Susan Rubio 'local° Park k Baldwin Piark, CA
inspector.. Attif was involved in planning the entire project and documenting all the jobs that must be completed. Located northwest of Baldwin Park City Hall, at the intersection of Pacific and tllaine Avenues to:Sterlirng Way, the Si 1M park project its supported by $i M. from the state budget, secured by state Sen. Susan Rubio, a former city council member in the. city:.
:San Gabriel River Bikeway Project I Baldwin Park, CA
Inspector. IIrfiras.truct.ure Engineers provided engineering design services for 2,5 miles of a Class U bicycle and pedestrian path project to connect: with an existing :lass Ili bicycle rouute. The entire project its built on rights-of-vv,ay either controlled by the City of Baldwin Park, Los Angeles County Department of Publlkc Works,, Los Angeles County Hood Conned District or Calltrans.'The right-of-way was ,acgiuired by the city through a and use agreement with the Los Angeles County Department of Public Works and Permits from Caltrarus District 7Jihe design phase of the project included project management and meetings, data collection and irecord research., utility research and agency coordination, surveying, hydraulic and hydrology analysis„ and final plains„ specifications and cost estimate (PS&IE).

Urban Bicycle Ptoject I Lynwood, CA
This project iinclluded construction of HMA bike path, curb and t.7wtteirs, curb ramps, retaining wallls, concrete s'waie , concrete boar culverts., chain link fence, permeable pavers, installation of removable bollards, gates, main waterline, irrigation, install trees and slh:ruubs,, mulch, instal siingl:e and dual AIM pedestrian, lighting poles and IlurThunaii:re, furnish and install way finding and Interpretive signs„ bicycle racks, fountains and striping.

Annual Street Rehabilitation Project O Compton, CA
lrnspecct:or. IIE performed in accordance with the plans, slm.:iiicaations and other contract documents and provided the following: construction of cold mill, ARNIM pavement, AC.. base course, aggregate base, full depth ACC slot pavement, curb and infrastructure Engineers, a Bowman company I Municipal Engineering Services r November 91, 202.3 55

Page 451 of 642 ends

Attif Fa r,. EIT
inspector
gutters, sidewalks, cross gutter, alley intersection,. driveway ,approach, curb ramps, signing, striping, markings, and pavement legends„ speed hurnp,: traffic signal loop, adjust to (grade existing sewer Ynnair hole,. water valve, water meter, and storm drain manhole. project location was Rosec:raIrs Avenue,. Compton. Avenue,: Slater Avenue and Sarnia Fe Avenue,
Structural Design Pius, proc.1 Sherrncan Oaks,. CA*
Attif was involved in planning the entire project and documenting all jobs that must be completed,. He managed staff and the expenses of the project. efficiently throughout: the process to ensure that adjustments for unexpected issues were resolved. He inspected pavement by utilizing the City of Hcllyvwood.!specifications for slurry, seal and placement of the. asphaltic concrete.. He designed and layout of dry utilities (fiber-optic, gas„ ellectric) sewer, box culvert,. storm drain,. spill:wsr'ay, detention basin, water quality basins, and WQMP; SVVIPPP, I:iCil1P reports for commercial and industrial projects. Utilized Caltrans Standards and Spec[ficatlons to oversee the inspection, of the Lamp bridge and related structures, llkroirl(ed in conjunction wiith construction managers, Vocal officials, and other parties to ensure the project met all safety standards white also accommodating deadlines,: budget qurrdelineS and other considerations.

Chapman Construction Corona:, CA
inspected and re'vie'wed projects to monitor compliance with standard specifications, safety code:,, and other regulations. Scheduled e+rents, programs,. and activities as well as the work of others, Used logic and reasoning to identify the strengths and weaknesses of alternative. solutions. Considered the relative costs and benefits of potential actions to choose the most appropriate one..

UR$ Corporation I Los Angeles, CA*
Preliminary and final hydrology reports, usiing unit hiydreagralph and routing method.

Preparing WQMP and SWPPP reports for Soda Maintain Solar Project 1350 -MW solar electric power generating facility) 29,000 acres.

North Spring Bridge over ILA {Avery providing wafer surface elevations for th .7ropossed and falset ork condition for LA River.

South Wilmington Grade_ Separation (access roads and. approaches to the viaduct) Port of LA, Performed drainage and WQMP report, storm drain:, sewer, water, and SWPPP plan according to C:aitrans standard and specifications..

SR -47 Truck Expressway Study, the project was jointly developed bythe Alsnrned'a Corridor -East 'Ccolrn,strrucitlon Authority and Caltransto replace the Schuyler Heim Lift Bridge with an elevated expressway to link Terminal island Vnrith Alameda Street. Using Calltrans standard and specifications ,Attif was responsible for the. storm drain, water pollution cointrot plan, hydraulics analysis for Cerritos Channel and PSF. F„ Infrastructure Engineers, a Bowman company I Municipal Engineering Services I }rwrorrcrnbe.r: „2023 56

Page 452 of 642 ends

Attif ix l f r, EIT
;inspector
K& A Engineering Corona, CA*
Design., plan checks and construction management for vvater (mainline,. pump station), sewer, box culvert, :storm drain, spillway, detention Ibasiro, water quality basin, and WQMP, SWPPP, i MP reports for residentiall, commercial arid industrial projects. Preliminary and final hydrology reports using rational,, unit hydrograph and routing method. Provide quality control and quality assurance so that the project is constructed in accordance with approved plans, specifications, budget and schedule according to Caltrans standard.

CM Engineering O San Bernardino, CA*
Worked with: the key project and construction contractor individuals to monitor action plans to rectify 'potential construction cost overruns or rdet ays and. accommodate significant changes to the .scope of work. Advised the client and other team members of any such changes. Att.if"s respon.sdbdllutie:s were to coordinate witlh the contracts management and project controls groups and any client subcontractors to maintain current and timely change orders according to Cait.rarn:s standard and specifications.. Participated in negotiations witlh regulatory agencies and: public meetings in support of clients" interests, identified the needs for specialist resources to create project teams capable of completing effective, quality work. Discussed the qualifications required of the key project positions in specific detail with the senior managers. Collaborated with the office facilities .staff to address project space requirements..
tJi dlyzing Caltr.ans standard and specifications., Attif was in charge of daily personal interactions with ciienitS,, designers, owners, contractors,, InspectOrSand authorities having jurisdiction on the projectt,. Attif piss promoted technical and commercial excellence on the project through the application of quality assurance processes.

Monitored and reported on the progress of all project activity Including significant milestorhe.s, and any conditions: which would affect project cost or schedule.

Established weekly meetings to review project :status and foririrw ate action items.

Texas State Highway Department Snyder, TX*
Highway design, pllan, 'profile, drainage facility, pavement, striping, and details, Monitored contractor's work and progress of construction to ernsiure camplldance with. piers, specifications for bridges, infrastructure and highway construction., Measured and recordecl pay quantities and prepared daily reports.. issued notices of non- compliance and step -work" orders,. Conferred with the contractor, designer;, owner, and / or governing authorities to explain the (basis for the issuance of the above - referenced !notices and to discuss a4xeptable corrective actions„ Material testing, measuring .and recorded pay quantities,
Infrastructure Engineers, a Bowman company I Municipal Engineering Services plovember9,.20.23 57

Page 453 of 642 ends

d n ■ at, I
r ; I,
rrrY_5pi''c or.

Education
M.S. Engineering, Moscow Civrit
Engineering Institute
Registrations
Engineer -in -Training (L.I'T'), California
General Building Contractor License
U3)
Certifications
s
Special inspector Certificates:

Commercial Building lnspect.o!r
Structural Masonry
Reinforced Concrete
Prestressed Concrete Special inspector
Associate
AO Field i achnician Grade 1
Division of the State Architect (OSA)
Regulations & Procedures (Part 1, II, ill)
Languages
(English (native / professional
proficiency)
Arabic (native/professional
proficiency)
Russian (elementary proficiency).
ncy)
lmad Z_t reigat has more than 40 years of ex.pe!rience 1!n constr€.rction inspection and resident engineer tasks. He has been responsible for preparation of plans, cross - sections, details, and specifications for various civil and landscape projects.: lrnad has coordinated with other engineering disciplines, responded. to plan check comments, and prepared material, take -off and cost estimates.

Experience
Urban Bicycle :Project I City ofLyr wood, CA
This project included construction of HM:A. bikes path, curb and gutters, curb r:.arnps, retaining walls.,: concrete swales, concrete box culverts, chain link fence, permeable pavers, installation of removable bollards, gates, In:':ain waterline, Irrigation, install trees and shrubs, mulch,: install single and dual ARM IPediestrian, lighting poles and Iluminaire, furnish and install: way finding and interpretive sighs„ bicycle racks, fountains and striping.

Maine Improvement Project l City c fBaldwin Park, CAA
Provided construction inspection of this project:. The purpose of the project was to create neighborhood -friendly pedestrian and bicycle linkages serving the areas surrounding Maine Avenue. The sidewalks were: widened by 2 ft, continuously on each side of the roaad,Aray; parking lane's have curb extensions at intersections and intermittent. locations., Utilities were placed undercjround, and the driveway ramps were reconstructed to provide flat sidewalk paths across driveways. (Lighting was improved and included pedestrian -scale lighting: every 75 ft intersections were improved with: new Crosswalk markings,: signal improvements, ADA. Ramps, and a roundabout at Main Avenue ! Oliive Street with safety islands for pedestrians and bicyclists,.

Long Beach Boulevard City or` Lynwood, CA
Provided compliance with plans, specifications, and the contract; oversaw traffic control, and provided daily kg and inspection report. entries„ including pictures of the project, IRev+iewed and reported contractor claims, aiims, (prepared \weekly update reports,, and reviewed contractor's invoices,. veriified completed work and approved all quantities. Infrastructure Engineers provided coristruct1on mana..gement, inspec:tion„ and labor compliance that: included roadway resurfacing of 192.,779 sq.. ft.. with a section of 2 -in AC top courses and 'I ir7, AC leveling course and 4O,f3OO sq., ft. with a section of 2 -in of asphalt rubber hot mix (ARHM) over 1 / 2 -in SAMl sealant and 1 -inn leveling course:, Concrete improvements included 4 -in sidewalk, driveway approaches, cross gutt..er:s, curb and gutter, curb ramps, installation of 16 detectable warning surfaces on existing curb ramps and construction of six new bus pads.

Pacific Pedestrian &. Traanspr ortarltion 9rri proverr erst Project jJ City of Huntington Park, CA
Provided construction inspection., preparation of daily reports, review of change *.E wpetie:nce prior to joining the firm orders and progress payment !requests,. coordinated soils testing se=rvice and assisted with labor compliance.

Infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9 2023
SCR

Page 454 of 642 ends

a
nail
Inspector
z
ur
� I
iiq t, IT
Mimes Avenue Street Ilnjp rov am:ents City of Mon tebeflo, CA Construction management and inspection services included constru.:tiion: inspection;, preparation ofdaily reports, review of change orders and progress payment requests,. and coordinating soils testing services.The project involved roadway improvements, and pavement rehabilitation with: concrete imp roverrnenhs of Frankel Avenue from Bluff Road to Sth Street and '16tlhl Street from Madison Avenue to Harding Avenue.

Horne 2 Suites City of Montebello,. CA
Provided construction inspection for this 203 -room eight -story hotel. The hotel will be owned by the city and operated by Hilton. The hotel is expected to generate more than :$1 M to tlhe city's general fund each yeaair.

City Sanitaeiry SSi w a r System .20% CCTV Project City of Montebello, CA Responsible far inspection of this project, including preparation of dailly reports, review of change orders and progress payment requests. 'The project involved televising and rating: of the condition of 2'D% of the city's sanitary sewer system, including possible acs -needed cleaning .,and draining.

Bluff Road Street Improvement meet I City of Montebello., CA infrastructure Engineers was retained by the clity to provide design, projr4ct. rnanagement,, (bidding, ,award of contract., construction management and inspection of the Bluff (Road Street. Iirrnpiroarem:ent project from Sycamore Street to Date :Street (.45 smile)..
�tlajk�lk�r Ave Street Improvements City o:f,Moratebetlo;. CA Provided construction inspection of this roadway improvement project. Infrastructure Engineers prepared plans, specifications .and estimates for roadway improvements, pavement rehabilitation, concrete improvements, A.DA Eimproveirmenits and utility adjustments of Maple Avenue from: Washington Boulevard to iN,4ines Avenue, The pavement analysis and alternate rehabilitation strategies included budget analysis to complete as much of the street fm:provemernt.s within the fixed project budget, Bicknell Park Pump Station Project A City ofMontebello, CA infrastructure Engineers provided project rnanagemernt, bidding, award of contract, construction management and inspection for the construction phase of Bicknell IEaairk pump station. Responsible for construction inspection, preparation of dally reports,. review of change orders and progress payment requests,
Citywide Safety Enhancement Active Transportation Pllran (ATP) , City of Bell Garder).r, CA
Responsible for inspection of this project, including preparation of dailly reports, review. of change orders and progress payment irequests.l she project area was comprised of the entire City off3rxll Gardens.. One of the goals of this project was to create a bike -friendly. environment to encourage residents, especially students, to bike to their destinations. The proposed work at various Iloa:ations inck.rded installing Infrastructure Engineers,. a Bowman company I Municipal Engineering Services November 9, 20,2. 59

Page 455 of 642 ends

ad Zur at, EIT
inspector
video cameras at several; intersections,. rn:stcaiilriq Americans with Disabilities abilities Act {.ADA compliant ramps., countdown pedestri:arr, heads,, and bike lane signing .and striping on some city streets that met minimum qualification fora bike lane.

Golden State Water Company( Corso((,, CA*
Prepared fie flew requests, invoices„ plan checks.., ureter service record cards arid. filinc.

West Walley( Investment Group I ThrR=.area, C.4
Supervised construction and safety hi seismic retrofit project in Santa Monk Parkingg Structure S. Monitored etxcav ations, poured concrete for foundations of piers ,at UCLA tower cooling building.

Minco Construction I Hcir•bor City, C,e°l
Followed d up construction and .safety project M1 t Compton College Stadium reno„atiorr, coordinated and managed subcontractors conducted %veckly construction meetings; prepared RFI, PCO, payment progress„ purchase orders, as -built drawings and take -off.

Pence Engineering lna9rl!e, CA*
Prepared plans, cross -sections, Malts, and specifications forVariol.1.5 civil and landscape projects. Coordinated with other 'engineering disciplines, responded to plan check comments. Prepared material,. take -off and cot estimates.

Infrastructure Engineers,. a Bowman company I Municipal Engineering Services 1 November 9, 2023 60

Page 456 of 642 ends

Christ her Ley, P•E
Senior Civil .Engineer
Education
IBS. Civrill Engineering, Oregon State
University
Registrations
Professional Civil Engineer:

California (#8O(2.0)
*Experience prior tojoinfng the firm
Christopher Ley ha:s over 15 years design and engineering experien:c+e. Fills expertise includes CAD and graphic design, civil engineering design Including street iayoiwt., hydrology, drainage,. sewer design and grading for res[dlentiaal and commercial projects.

Experience
Alen and Associates Irvine, CA*
Project Engineer. Christopher was responsible for civil engineering design including street (layout, hydrology, drainage, sewer design and grading for residential and commercial projects. Skiilll+ed inl developing plans .and survey data sets using AutoCAll) Civil 3D 2012 and 2016. Production of reports using Microsoft Word and (Excel, Bentley WaterCAID, and i3llu e.bearm.

WIEI .d IL&S Engineering I Monterey, CA*
Staff Engineer / CA[) Manager. Responsible for civil engineering design including street layout, hydrology, drainage, sewer design and grading for resideentiial and commercial projects,. Skilled in developing plans and survey data sets using AuutoCAI[) Land Desktop .2.006 and AutoCAD Civil 3D 2011.. Responsible for company's migration frornn (Land Desktop .2O06 to Civil ,31[) 21111. Subsequent duties as CAD Manager, responsible for all training in Civil 3D after initial off -site classes, devellopmerrt of comprehensive styles and description key :$ t5, and implementing transitions to Civil 3O standards from (:.and Desktop, Also developed training aids and curriculum: for transition. Re,sp•onsible for conversion ofCivil 3D files for ltevit.

Administrative aassktant duties during slow periods, including accounting, filing ,and ounce development. rr duties when necessary, including rebuilding 'network ork after i:ncompiete implementation by consultant, WWD be c rrue L&S in August 2O12.

Sarroyan [Mastorbuilders I Sand City, CA*
CAD Manager Senior Draftsman, Responsible for residential and commercial design. and drafting while ensuring ADA compliance, egress requirements and coordination of plan; from various disciplines into a single set„ Was responsible for implementation of AuutoCAD 20O :system, training of 2 supervisors, development of CAD standards and overseeing transition from hand drafting..

Greenway Design II Marina; CA"
Drafting and Engineering Manager: Residential design and drafting inducting determination of code compliance for lateral stability and egress. Extensive. experience witlhr. IV cn: sst,ation V8 an:d'rr1ionrmla production drafting of residential structures., including application of engineering notes.

Lindell Cedar Homes„ Inc. II Scathe, ifl+'A
Senior Draftsman. itespons[Ible for residential design and drafting, including determination of code compliance for lateral stalbliity and egress. Instrumental in creating structural designs of posts and beams for a variety of vertical and Ilateral infrastructure Engineers,. an IEiowrntsn company I. Mumic[Ipall IEng[neeriing Services November 9,, 2023 61

Page 457 of 642 ends

Christopher Ley, PE
Senior Civi! Engineer
loads, Pioneered development of various charts .as aids in design of structural elements. Directly involved in the implementation of Microstation Triforma 3D, and developed methods of aligning nor: -planar elements that nrvere subsequently used by Microstation in their official training programs.

Baker Engineers, !Inc, I Lynwood, W
Staff Engineer. Duties included :structural design including wind and seismic analysis., gravity. design, rigid frame foundation design and pin pile foundation design.

Production and structural dletaii drawings and drafting foundation ;plans.

Infrastructure, Engineers, a Bowman company I Municipal Engineering Serv'ice.s E November 9,.2©23 62

Page 458 of 642 ends

A. rFar r,hani,TE,PE
Senior'Drank Engineer
Education
B.S. Civil Engineering, California State
University, Los Angeles
Registrations
Professional Traffic Engineer,
California (#T23Cr3)
Professional Civil !Engineer;
California (#C54235)
"l:xperiefce prior to joining the farm
Amir IFaralhrmii has more than 30 years of experience in: various traffic, transportation and civil engineering disciplines. He has experience with contract administration, design experience and regulatory compliance.. He has worked with infrastructure Engineers., a Bowman company f'orthe past two years as a Principal Engineer, He has been in charge of various traffic and transportation studies; design of traffic signals., high -intensity activated cros3vrrallk (HAWK) signals and liectarngullar Rapid Flashing Beacon (RUB) for pedestrian: crossiings, in working with the City of orange, as an Engineering 'Tech. It and eventually as a City Traffic Engineer and Transportation ,Manager., he has been involved in tafll aspects of the projects the city has designed and constir cted This includes coordinating with local,. county, state, and federal agencies and 'various utilities to ensure successful project completion.

A.t,r it iin:fer:stands the level of detail and problem -solving skills required to complete high -profile projects on time and unri'thin (budget.
(Experience
Slauson Avenue Congestion Relief improvements Project I City of Huntington Park, CA
Project,Manager. Conducting traffic signal left turn !phasing for tone intersections in the project limits and recommending protected permissive left turn phasing wiith flashing yellow left turn .airrow. Designed the sulbject traffic signals accordingly and prepared ME.

ATP Circle V••S.a'fe Routes and Childhood Obesity Project I City of Huntington Park, CA
Project Manager. In charge of various traffic related works such as design of HAWK beacon system: for 'three pedestrian crossings; design of pedestrian scramble crosswalk striping traffic signal modifications to create a separate pedestrian scramble cycle, rest:riping of existing crosswalks with a high -visibility continental design.; realignment of existing crosswalks to align with the proposed conversion of Hood Avenue into .a one-way street and prepared the project If' v&E• Imperials H tf and Ruth ,Avenue Traffic Signal Improvements Project ject u City cif Lynwood,. CA
The work to be done, in general, consists of, but is not limited to the following:
mobilization„ traffic control„ remove existing crosswalks,. warning lights, and streetlights; removal and construction of concrete sidewalks, curb and gutters, curb ramps; furnish and install traffic signal system, battery backup systerm, pull boxes, traffic signal (loop detectors and connect DLC to pull (box, relocate fire hydrant and uuv,atervalve., providing ,con'struct on survey, arid traffic signing, striping and markings as shown on the pllarns and noted in these special provisions.

Infrastructure Engineers, a Elowmrnan company ( .Municipal Engineering ,Services I tuvovember9, 2023 63

Page 459 of 642 ends

ir Fara mr,TE, PE
Senior Traffic Engineer
Senior Traffic Engineer / Ma a ger-Transpor'tation Services. I City T'rrafc Engineer City of Oronge, . �.

Arm!ir utilized his i any years of experienceto mange various traffic and civil engineeringp projects. He also managed traffic and civil construction projects during his employment with the City of Orange,. Amir planned,. managed„ and provided o'vers!ight of the daily functions, operations and activities of traffic and transportation division of the Oty of orange, including Traffic Management Center (TMC),. tra. flfic signal timing:, operation and maairnte'rance, review of residential and commercial developments; and was responsible for leading the traffic operation and transportation planning te:aa!m.:A.rtinir also managed and participated in the development and implementation of goals., objectives,. policies and priorities for the division, He:: also provided recornnnendati:o!rns. within departmental l policy regarding appropriate service .and staffing levels,
Oversaw and participated in the development and administration of the operation and capital improvement division annual budget participated in the forecast: of funds needed for staffing, equipment, materials„ and supplies; monitored and approved expenditures; implemented adjustments. Attended and participated as City Traffic Engineer a:rt city council, commissions, committees, and other agency m eetirigs as required. Prepared and presented technical information, analysis, and recommendations. e!nd.atiotns, Oversaw the development of consuita!nt requests for proposals for professional and construction service's arid the advertising and bid processes; evaluated proposals and recommended project award; administered contracts after award.

Collaborated with other city ddep rrtment..s, polite, fire, Caalltraans, OCTA and crtlheir outside:agencies to pia n:, implement and complete prra,je.ct:s and initiatives to improve traffic safety and mobility around the city; lderiified outside funding source.s for city traffic and transportation programs,. directed and prepared funding applications.

Responded too traffic and triarnsportation related resident and commuters" inquiries and requests.. Oversaw traffic Signal :plains preparation and coordination programs, developed and approved traffic engineering standards and policies for the city.

Reviewed and ;analyzed studies, -environmental impact reports, proposals, and negotiations. vvitlr other agencies to secure pr'ojects and policies favorable to the city., Senniior Civil Engineer J Associate Civil Engineer f Assistant Civil Engineer Engineering Tech. H !City of Orange, CA*
Planned, prioritized, assigned,:sup rvised,reviwedandpaarti:c:ipatedintlhewort<:
of staff responsible for (providing traffic engineering. services within: the assigned section, Developed and prepared construction plans, specifications, and estimates .for vrari!ous iin--hor-ase design projects including traffic-: streets, sewers and storm drains..

Participated in .the selection of engineering staff; provided or coordinated staff training; worked with employees to cor'r'ect deficiencies; implemented infrastructure Engineers, a Bowman company [: Municipal Errl.Jhneering Services I November 9,. 023 6.4•

Page 460 of 642 ends

J nr.ir F aha TEy PE
Senior Traffic Engineer
discipline procedures. Reviewed and prepared transportation and traffic engineering studies; prepared requests for proposals; reviewed environmental impact reports; reviewed transportation models. Performed project management for the design and construction of capital improvement projects for city departments including public works, community services,. economic development and ire„ Ensured conformance with state, federal, and Iloc.:al standards and procedures in carrying out projects.

Prepared and applied for project funding from federal, state, and utility grant programs including Highway Bridges Rehabilitation and Replacement (HBRR), Arterial Highway Rehabilitation (Program (A,HRP), Safe Route to Schools (5R25/ SRTS), Highway Safety Improvement Program NSW), Transportation Enhancement Activities (TEM Orange County Sanitation District Cooperative Projects, State -Local Transportation Partnership Program (SLTPP), Community Development Block Grant (CDf3G) and City Engineers Rood Control Advisory Committee (C.EFCAC).

Interacted and communicated with the public, city management and departments,. contractors, consultants and other governmental agencies to resolve issues.

Prepared and processed various documents including council agenda reports, consulltarnt agreements, hydrology and hydraulic studies, requests for proposals, plan check„ consultant selection, bid evaluation, insurance certificates, environmental compliance, encroachment permits, right-of-way and reimbursement packages.

Revised and maintained city standard plans and specifications., Infrastructure Engineers, a Bowman companyi Municipal Engineering Services l November 9..2023

Page 461 of 642 ends

'Charlie " r arr,
Water Engineer
EdViCatiion
B.S. Civil Engineering (Envffr₹arnental
Ermmphasis), California Polytechnic State
University,. Pomona, 19€3•7
Registrations
s
Professional Ciivil Engineer:.

California (#534351
Associations
Associate Member, American Society
of Civil Engineers 1:ASC.E), Metro LA
Branch
A.mer'ica₹nWater Works Association
f AWWA 1
Orange County Water Association
('D'CCWA), past member
Water Emergency Response of Orange
County, Engineering Advisor, past
member
*Experience prior ro foinrng the firm
Charlie Mari is Principal Civil Engineer with engineering and management experience in water and sewer systems master planning and design, including (hydraulic modeling, and water resources analysis in support of pump station and pipeline design, and creative solutions to sewer service that .may not be conducive with standard coperation:.The master plans for domestic water;. wastewater, and nondomestic water systems performed for cities' large residential, industrial,. and comnneircial dcevellopments; and university campuses agate -wide t,ipic:alty include preparation ofrcapital improvement programs identifying future facilities and sizing to accommodate proposed infill and service area expansion.. Master planning and hydraulic modeling are (key tasks for preliminary design of both water and sewer Piping and pumping systems to determine optimal pipe diameter, and pumpiing / system curves for reliable and efficient operation.

Experience
Avalon Tract 36649 Water and Sewer Calculations Aiwa Valley, CA Prepared waiter and. sewer -Pow estimates and hydraulic analysis. The water and sewer purveyor for the Project:site is Rulbidoux Community Service District who conditioned the analysis in order to confirm the capacity oft heir existing systems to serve the Project. RCSD Water and Sanitary Sewer Systems Design and Construction n•man₹.ral dictating operating parameters to verify with the completion of the proposers project and full occupancy.. The Manua( was used for estimating average and peak water, as well aS procedures for evaluating system operation. For the water system that meant maintaining minimum pressures and maximum. velocities.. For sewer, it was determined that depth ratio increase was ne.gligitbfe.

M.CRV Sewer Service Evaluation ( .Houston, TX
Assisted on a development project for Houston Medical Center RV Resort, Utility service challenges stemmed from a remote iocatic+n for this medical facility designed for recovering hospital patients, and a scheduling misunderstanding for a .sewer main iirne construction_ The se.. wr'er would not be constructed for at least a year following patient move -iris to the Resort. Blue Mountain Development assembled a team of experts to help cc:ordinate approvals for a teinporary bump -to -haul operation, which required compliance with additional regulations associated with hauling medical wastewater. Provided technical guidance for collection systern, w a!s1awa•ter storage, pumping capacity, and service frequency schedule. This allowed Resort operation until the sewer main could be constructed and implemented for permanent service,.

L,:nPelinna Master Plan Update 4 Lea Palma,. CA
Recently completed La P,alma's 20.2{1 WSW' Update. Prior to this, :prepared the City's Sewer Master Plain iand SSMP,. complete with a L ASSCCJ'••c.ertif ed condition asse.ssrnent specialist for identifying and prioritizing all defects found for a major portion of the city's system. The updated sewer reports inc:du.ded hydraulic analysis and focused on: Updating the CEIP and required SECAP of the SSMliP. As a result. of the infrastructure Engineers, a Bowman company f i1A:u.uni<:ipall Engineering Services Novernber9,. 20.23 66

Page 462 of 642 ends

Charlie Flare, PE
Water Engineer
detailed studies, the ciity has been compliant with tlhe WDR :and SSMP requirements, YlyreB No. t :Site ImIlwrovements BeilGa.rde.rr.s, CA
Preparing preliminary design. and final design for the city's well .site improvements project as an applicant for State Water IResx.eurces Control Board funding to improve its water supply system and maximize its use of local water supplfie.s. New facilities include Treatment vessels PFAS contamination,. 1.2 MG steel storage reservoir, .aired booster pump station;. The project team soVicited the expertise of RC Spade and Associates, renowned grouindwate.r and well! planning speciaVists, to provide opinion regarding feasibility of drilling a second well within: the project site.

Appurtenances include (1) on -site piping and valvi ng; (2) booster pumping with variable -speed to control flow for the closed ,system operation; (3) modifications to existing well operation; (4) 1 minion gallons of on -rite storage, (5) new rhiioirirne injection /analyzers; and (6) SCADA oflvr..es.The PDR'plhhase is 'complete and final design was underway until) IPI AS contamination was discovered requiring the addition of pressure vessels i(GAC or Von -Exchange).

Pico Apartment Building Rehabilitation
raro Pico Rivera, CA*
Assisted in resolving a sewer service challenge for a 79 -wit apartment complex which was undergoing a ccoinmplet+e rehabilitation.Tlhe rehab project exposed ,ewer issues that required a complete overhaul of the service concept, including Offfsite collection to, and utilization of, a recently decommissioned LACSIE) trunk sewer.

Assisted in the presentation of these alternatives, and ultimately improved sewer service for the entire project.

Golder! Oaks Senior Living I Whither, CA*
Evaluated the public sewer system: and capacity to serve a new senior living facility„ The review was critical for obtaining city approvals to connect to the existing sewer system that was thought to be at capacity. Key demonstrating existing capacity was the extended flow monitoring operation 'performed by flow monitoring contractor (US Cubed). Determined t.lhaat existing lows were within ,acceptable operating depth ratios, and that the addition of flows frcarra the new residential development would contirnu€e operating at ,acc,eptalble depths,
Tournament Hill Sewer Analysis I Beaumont CA*
Prepared a sewer analysis fora potentially undersized trunk :sewer to be utilized by the proposed 'Tournament I•alills residential project (Project). The trunk sewer system starves hundreds of acres of exiting developimernt and is proposed to serve a separate development within the :same sewerslhed as the TH project. The team coordinated with the sewer purveyor (City of Beaumont) to understand the design" boundaries of the sewwershed, estimate sewer volume artd peak flows, evaluate record drawings of the sewer,. and make rn d.eterimiination of its capacity to serve the Project. The study resulted in: options that could be implemented, including monitoring of flows during Project developrnent rnavve-ins and acceptabie design procedures for a sewer infrastructure Engineers, a Bowman company I Municipal Engineering Services u November .9,2023 .67

Page 463 of 642 ends

Charlie PE
Water Engineer
anticipated to flow full during wet weather, inflow and Infiltration (I&I) can be very unpredictable, Ibut can be reinirni:zed if designed for..

Wastewater Recycling ycling Plant and Recycled Water Use Coronado, CA* Part of a Civil (Engineering team to update a feasibility study prepared for a high profile'wastewater reclamation and reuse facility on the Coronado Golf Course„This high profile project is a result of the conditions caused by .five yrear, of drought and limited watering allowance, and to develop a more reliable water supply for irrigation. city and golf course officials authorized an in-depth study to update their ton'1 feasibility study and prepare bridging documents to pave the way for procuring a design build (D -t3) teann.The study proposed to include (1) feasibility study update; (2) engineering report preparation for the Waste Discharge Requirements; (3) public outreach and workshops;, (4) funding opportunities; (5) CEQA., CA Water Code and N0MA WateReuse compliance, and (6) 1')-B team solicitation and procurement, The Foundry I Redondo Beach, CA*
Teamed with Blue Mountain Development to re --direct sewer flows from an old metal working operation site to a more appropriate sewer system (:onditiooed by the city of Redondo Beach. The site was under re -development from an industrial land use site to a high -end multi residential development. Existing severing from the old metal- working operation included a problematic siphon that required frequent flushing to minimize odor issues.. By converting the sewer system as part of the redevelopment project, the city' was able to remove a"hotspot" maintenance issue horn their O&M program., The recommended sewer system had to be pumped from a central pumping facility on -site to a different location within the public s)rstern, which was accomplished using a private gravity flow system to a low-pressure pumping station and discharge system pre -fabricated by E: -one..

Infrastructure Engineers, a Bowman company i Municipal Engineering Services I November9',.W23

Page 464 of 642 ends

Nat an Kirby
Administrative Support
'Education
Business,Administration„ Cypress
College., Cypress, CA
*E"rr 7orcrnce prior r joining the Perm
Most of Nathan Kirby"s career has been spent in service to municipalities in Los Angeles County. He has (held positions in: which he has been responsible for administrative duties related to public works projects., construction and quality controlt,
Experience
Complete Street Improvements on Maiine Avenue Project I City of 8aldwiru Park, CA Served as project assistant., Scope of work included !removal and replacement of sidewalk, curb and gutter, driveway approach, catch basins, and manholes, rain garden, Ilancl.scape, new pavement, which included manhole adjusting and.st!reetViight system. f esponsihible for preparations and / or organization of all construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, IRIFrs Might of Way Maps„ Daily Reports and Weekly Statements.

Garfield Avenue Improvements Project i a'yage Gardens, CA Served as project assistant, Scope of work included removal ,and replacement of sidewalk, curb and gutter, traffic loops, .regulatory signs, curb ramps,. and new pavement, which included manhole and valve adjusting.. Responsible for preparations .and .I' or organization e,nf,0 construction d' currents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, RFII"s, (Right. of Way Maps, Daily (Reports and Weekly Statements.

ATP Cycle 2' Uncontrolled Crosswalk Pedestrian: Safety Enhancements 'Improvements Project I City of Huntington Park, CA
:Served as project assistant. Scope of work included removal and replacement of traffic signal :systems, vehicle and pedestrian heads, cabinets, controllers,. pedestrian push: buttons, curb and gutter, curb ramps, flashing beacon, HAWK signal, street name signs, traffic striping ,and tree removal. (Responsible for preparations and / or organization alai construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, RR's, Right of Way Maps, Daily Reports and Weekly Statements.

Water Main Replacement Propect. I. City fMrntington 'ark, CA Served as project assistant Scope of work included removal aar,d repllacement of concrete sidewalk, curb and gr.utter;, driveway approaches., curb ramps,. 8 -in and 110 -in water main line., water meters, vvater service lines, tree pruning, and new (pavement, which included manhole and valve adjusting. Responsible for preparations and J or organisation of all con.strurc:tion documents including Contract Change Orders, Meeting Agendas, (Progress Payments, Project Budgets, RIFI's,'Right of Wray Maps, Daily Reports and Weekly Statements.

Infrastructure Engineers, a Bowman company Municipal' Engineering Services 0 ,November' ,.2023 59

Page 465 of 642 ends

Cali Hildebran
Public Outreach Specialist
Education[
€S. Geography, California .State
University, Fullerton
Certifications
Geographic information System (GIS)
*Experience prior to Joining the firm
Cali is a highly rno€::ivated: self -motivated, detail -oriented self-starter with high proficiency in various disciplines and fou.rr years of experience. Cati: has a B.S. in Geography, a certificate in GIS, experience with AIrcGI S, Microsoft Office 'mite, Googte Suite, C nnva, digital and print marketin:y,>,AdelDslte rnanagennent,.quality assurance, research and more. t ali's unique skill -set makes her a valuable member of our team., Exp Irience
t:n.fra stn ctl. re Eiagimem ire Bowman n company I Br ec,. CA Planning Technician. Linder gF ner�rl si.iper'vision of internal senior stiff, provides a variety of essential planning, GAS and marketing functions. Cali provicies technical assista.nce and information to internal staff on projects„ the public, performs technir.tiaf work implying 'customer service,; review of app[icaatfons and plans for completeness and compliance and performs other related work as necessary, Call provides assisG.axrrt:.e to staff planners, .as needed and serves as the projects primary Nanning Technician on-caii, Under the genera€ :supervision of the Planning h/fanager and Gl i, Analyst, Cali also provides technical and support assistance in the deve€oprmn:Lnnt and implementation of Nanning Division activities and GIS Su.pport Servkkes. These activities include but are not limited to providing land use and planning information assistance to various project teams; performs and provides GIS computer application support to the GIS Analyst to various project tea rns;. and is vested iin learning through hand's on training, project tasks and mentorkng by :senior levet staff.. kt;ase ILLS: I Norl,eolk, (:A
.Marketing Coordinator. Call drove the f:reation and maintenance of the company's internal social media calendar. She created and scheduled content for the following social media platforms: instarjr. iir, Fiacebook; Twitter,. TikTok, Liinkedin, iPiniterest, etc. Worked collaboratively with designers in the ideation and execution of visual content, Assisted in communications and developing and impfenrPntrf9'S Ciell cair paaignswith ambassadors and influencers.. Dally interactions wit:€a the:sodaal media community by responding to messages,. comments and drive engagement. x"IrZ Printing, Mc, I An,aheirn, CA*
M.arketiing Assistant Asistedd in the everyday operations of the comppany`s social media .accounts by developing daily social media content and scheduled pasts to coincide with target audience usage. Einnp€emented strategies b expand brand recognition, in the 3D printing industry. Provided outstanding service tc new and existing customers by+focusing on customer concerns and developing ,citation's via phone and ermail. Increased customer base by c:ollabor.ating with content creators, and promoting products through giveaways,. product content and promotional sates.

Researched cn:mpetitor services and trends ifor analysis of marketing strategies.

Infrastructure Engineers, a Bowman company Municipal Engineering Services I November,n,:.2.02.3 70

Page 466 of 642 ends

ShawnShawnt abak
QA ,/ QC, Engineer
Education
AutoC.AD, Glendale College
AutoCAD Civil 3D, Westech Col:legrc
I' icrostation Westeclh College
Larid Development Desktop, Westech
College
*Experience prior to joining the firm
n an
whawrnt Babakhanian has 30 years: of experience in the preparation of contract drawings for a variety of civil e.ngd:nee'riing, transportation engineering and structural engineering projects, IFfe also has exte. nsive knowledge and expertise in: both IT and CA.DD managemerat.

Experience
Bartlett Avenue Rehabilitation Project City ofAdeiarrto, CA CADD Manager. Responsible for overseeing the projects drafting, design, cost estimates,, and specifications for improvements to the asphalt pavement, cross gutter, ADA curb ramps, and water main relplacernernt.The project was in.ot only completed according to the clients requirements but also finished on sche.du.rle and well within the budget, cdget., in: .addition, oversaw drafting quality assurance arnd quality control to meet the standards and requirements set forth by the City, of.Adelanto.

Beillfllower Street Rehabilitation Project I Ciiry of t delcrnto, CA CADD Manager. Improvements to the asplhaf pavement cross gutter, ADA curb ramps, and water main replacement, Responsible for reviewing the project's specifications and cost projections,, as well as the design, and drafting,. In addition, responsible for drafting quality assurance and quality control to meet the ,tandards and requirements set forth by the City of.Adellanto.

Sin Street Enhancement Project l City ofHuraington Pork,. CA Designer 1 !Grafter. Sanitary sewer, water, and street im:provemeint plains,,. including pan and profile, cross -sections, c.onstrirac.tiion details, utility, and traffic striping plains.

Was also involved in preparing specifications .and cost estimate for the project,, which required the replacement of the old sanitary sewer and water system with a nevirer system. that was up to staroclards, in addition,, was responsible for quality a.ss.t rarace I' quality control for drafting of civil pllan;, during the project.

Water ?iai:r'a Replacement Project City ofiiuntington Pork, CA Designer J Drafter, Main water Hine, fiirte hydrants, water meters, and backflow prevention element &the project. Also in dhairge oftheY held investigation, specifications, and oast. estimate. In addition„ was responsible for quality assurance / quality control for project plans and details during the project The project was completed per standard detaiii.s., on thine, and within budget literri:oius Residential Street Improvements (FY 2t 211) City of Hawaiian Gardens, CA Designer { Drafter, Street improvements, signing and striping, and utillity plans„ in addition, was involved in design, specifvcatiion, and cost etitimate.s preparation.

Responsible for quality assurance / quality control for project plans and details to ensure the project was completed while adhering tocity requirements. The project was completed on: time and within budget,
Infrastructure Eingin'eeirs, a Bowman company u.M.uinicipal Engineering Services I November 9, 202.3 71

Page 467 of 642 ends

h- w t Babakhanian
QA/ CK Engineer
Schmidt Road Street Improvement Project I City Monte., CA Designer / Drafter, Street iim.p'rovernents, signing and striping ip:l:ans, In adrtituor1,: arias involved in .specifications and cost estimates preparation.. He was responsible for quality assurance /quality cont:roi for project plans and details to ensure the project was completed while adhering to city requirements The project mv'a•s completed on time and 'within budget.

Ailey trap'Sr^ua+watmenagt,lrrasrious Street Rehabilitations &td Water Main Replacement Project City ofis'rera,
Designer / Drafter / Utility Coordinator.. t.or.. Responsible for designing ,r' drafting alley Pavement, long itudinai gutter,. street improvements,. signing and striping and :utility improvements within the project area. In charge of drafting the main waater line system, fire hydrants, fire services, water meters and backflow prevention for the project, Also, :resporasible for i:rcgr,riirirng.and verifying utility plans by coordinating wiith utility;agencies,. Shiaw.nt oversaw quality control for the project to ensure that ft was completed while observing city requirements.,
Alley and Industrial Street Rehabilitation Project. u City ofBreo, 0 Designer / Drafter, Responsible for the preparation of plans;, profiles, and details, and involved with the field inve.stigatio.r that included field surveys of the asphalt pavemesnt,, sidewalks, curbs and gutter,, driveways,: and curb ramps. Also involved in specifications and cost estimate preparation. Responsible for quality assurance ,1 quality control for the projiect% plans and details to ensure that the project was completed vwhihe ,adhering to city requirements. The project was completed on time .ar..d budget..

Lincoln Park rimprov.e e,rnt city of CA
Daesir ner / Drafter,: Project: inclluded construction of -roadway improvements, including removal of existing improvements l rig AC pavement,, concrete sidewalk, curbs and gutters„ storm drain improvements and lair dsca.ping, and construction of new street and sidewalk improvements, including new concrete curb and gutter concrete :sidewalk, storm drain catch basins„ d:rain::age inlet modifications and AC pavement sections.. in addition, was responsible for quality assurance / quality~ control for drafting of r_ivili plans during the. project.

Safe Routes to School - Pleasaant. View,. Vineland and Tracy Elementary Schools; I City oi.Egohlwr.rr Park, CA
Designer 1 Drafter. Preparation of PS&E for new signing and striping, curb extensions,. new curb and gutter, sidewalks, ADA-compliant ramps, and pavement. r)the.r improvements include the installation of detectable warning surfaces. The project:
consists of work on nine intersections.

Infrastructure Engineers., a Bowman company I Municipal Engineering Services I November 9, W23 72

Page 468 of 642 ends

Jason Wasm
Planner ill
Education
Master of igrban and 11gional
Planning, Ufve!r:s ity of CaEEIfo
Irvine
nd, MUR
Environmental Policy, Analysis and
Planning,: University ofCalifornia, Davis
Affiliations
American Planning A:ssoc:iati!on(AIPA)
member
*Experience prior to joining the firm
Jason Waasrnund has over 20 years of experience in current and advance planning including General Plan Amendments, Housing IEllemeirnt iJlpdat.e:s, architectural design reviews„ historic preservation planning, and extensive high fermi entitlement processing. Having spent nearly his entire career working for cities in Southern Calliforrhfa, Jason Is an expert in urban land use planning. He. has led the development of significant portions of housing elements, processed annexations and code amendments., managed tlhe designation cif numerous landmarks, and managed a variety of commerciall and residential development projects including general plan amendments, zone changes, planned unit developments., and conditional u:se permits. Jason is proficient in :Accessory Dwvetlfng Unit (AI)!1J) application processing and oversees tlhe processing of Commercial Cannabis Program applications.

Experience
Infrastructure Engineers,. a Soloman company U Brea, CA Planner I.III:. Jason provides support services on current and advanced planning projects !including Housing (Element Updates, Environmental Justice Elements, Public Safety (Element Updates,, Specific Plain Amendments and associated CEQA documents.

As a planner, Jason is well -versed in entitlement processing, the preparation of staff reports, !resolutions,, and ordinances; has'extensive planning counter experience, and assists witlh public outreach activities such as scoping meetings,. rivorfslhops, ch.arr€'tees and popup events.,
2023.2031 Housing Element Update I. ,City of Wcasco, CA Senior Planner. III= has been selected to prepare the 2023-2031 Housing: Element for the City of Wasco. Jason its tlhe lead urban planner in the development of the 6th Cyclle Housing Element, under'Malta Durarhd"::s direc'tuon..Jason has contributed: to the research and composition on this project, leading the development of the constraints, previous element review and programs sections.
202.3-2031 Housing Element !Update I City of 5hafter,. CA .Senior Planner. II: has been selected to (prepare the 2023-20'31 Housing Element for the City of'Slh,a'ft:er. Jason is the lead urban planner in the development of the Housing Element, under Maki!a IDurand's direction..Jasorn has contributed to the research and composiition on this project, leading the development of the constraints„ previous element review, and programs sections.

Senior Planner I City of Noco, CA
Jason provided' staff augmentation to the City of Norco. Jason .served the ciity as a part-time Senior Planner on an interim basis, provided on -site support services, completed housing e':lenneir t annual reports and processed an annexation to the city.

Senior Kanner I City of Moreno Valley, CA
Jason recently provided remote planning services to the City of MiorernoValliey on an interim part-time basis. He perform -xi plan checks and reviewed tentative tract map infrastructure Engineers, a Bowman company I'Mu.unic::iipal Engineering Services November '9,.i 023
73

Page 469 of 642 ends

Jason Was
Planner !II
u n
MURP
applications to planned unit development involving a general plan amendment / zone charge for the city.
2021-20:Z9 Housing Element Update l City o Adefunao, CA Senior Planner. Jason is the lead urban planner assisting with the di:.yveEopmer t of the City of Adel,anto's Housing? E:ie!nnertt under Ma [fa Durand`s directioon, Senior Plianneri C.ityofAdkiantc, CA
As part of lE"s Pliaanning Support and Staff Augmentation Services contract with the City of Adeianto, Jason provided on -site support services to the. city on current ,and advance planning projects and CEQA. corn pliance...lason managed time dally planning functions including assigning plan checks,. rn•anaging the current projects list, managing major current planning projects, coordinating reports: to the City Manager and providing direction to /:supporting the j:irof'essiona.V development of planning staff'.

Senior Piann+er 1 C:ityothicirrtinq.ton Pcwk CA
On (behalf of 11;, Jason provided staff augmentation services to the City of Huntington' Park a full-time iinterirm basis on major current pllrarining projects, poky u:levieioopment and CEQ.A: compliance.

Associate pl:ann.er t City of Corona, CA
Jason completed a 12 -month assignment at the City of Corona as the exclusive planner assigned to process over fifty Commercial! Cannabis Program applications packets, developing review processes, identifying and proposing solutions t:o application review issues .and providing strong customer service to initiate a successful commercial cannabis permit program. His processing skills and knowledge resulted in the successful completion of hiis service,.

Design & Historic Preservation Section ( City of Pasadena, }na, CAS Assistant Planner, Extensive background in design and historic: preservation planrnin,g;, including entitlement processing, preparation of staff (reports and public hearings.

Jason participated in the designation of numerous landmarks, Nationaf Register nominations, design review of commercial buildings and multi -family residential development, numerous Certificates of Appropriateness :and implementation of a master development plan,
Department of Planning and Redevelopment' City ofGfr ndorq, r::A* Assistant Planner. Extensive background in current planning, entitlement processing, regular counter assistance, research and preparation Of staff reports, and public hearings before the Planning Commission and City Council. Projects included entitlement proc_e.s:sing for new commercial buildings s and additions; multi -family residentlat developments; new wireless sites and co-Vo•ca'tuons;. second story reviews; code amendment ordinances one changes.; variances; conditional use permits; artd historic landmark designations.

Infrastructure Engineers,. a Bowman (on) i Municipal Engineering Services November 9 2(323 74

Page 470 of 642 ends

hn
r
n
Environ:me:nta! Planner 11
Education
B.A. Urban Studies, California State
university, Northridge
*Experience prior to joining the firm
John is a highly motivated arhd goal -driven professional offering 17 years' experience preparing environmental compliance documents pursuant to the California Environmental Quality Act (C:F CQ,A) and the National! Environmental Policy Act NEPA) .for both 'public. and (private :sector clients. He has prepared Categorical Exemptions, Addenda, Initial Studies (ISs)„ Negative (Declarations (N:Ds) and Mitigated Negative De.clairatiorns (iM:NDs)„ Environmental Impact Reports (EIIRs), (Program El Subsequent E.IIRs as well as tiered documents and combined C1:QA / NEPA. documents„ He has excelled in developing comprehensive arhdFe alVyr c1efens!ibie CIE QA I' INIEPA documents and effective permit applications for complex and challenigh-ng projects.

His documents are precise., clearly written, and well organized. Additionally, his experience also includes preparing Housing Elements and has experience working with cities as an augment staff member primarily reviewing project plans for consistency wiith city development standards .and land use /zoning requirements.

Technically proficient in all Microsoft Office prtiog!rairns and farrniliarwith AutoCAiD:, ArrhiCAIE) and Arch GlS 8. John is also fluent in Span'E::x.lh..

Il acii erieince
2023-;x:031 Housing Element Update j. City of Wasco„ CA Associate Environmental Planner, Serving as an .Associate .rwiirorm!nnikantall (Planner„ .John assisted ninth the preparation of the City of W'asco"=.s Housing Element to ensure time Housing Element was being prepared iin compliance raIIV state requirements.

John took on several roles in the completion off the Housing Element which included: identifying and analyzing existing and (projected housing needs for all economic segments of the community; providing a summary of the population anti housing characteristics that contribute to the present and future housing needs in Wasco; provide goals„ policies, quantified objectives and scheduled programs to (preserve, improve and develop housing:; attended several community meetings and participated i:r' public outreach efforts, prepared a Categorical Exemption in compliance with CEQA and frequuera direct contact with staff of'various state agencies.. Housing Programs., which John helped develop, became the basis for annual progress (reports (:APR). The 4-Vousinrg Programs included:1) Adequate .Sites for Affordable Housing; 2) Home Ownership Assistance Programs; 4 Section 8 illousung Choice Voucher's; .5) City Grants for Special Needs Grouip's; 7) Code Enforcement; 8) Conservation of Existing and Future Affordable Units; 9) Streamline Residential Permit Processing; d 0.) and !Fair Housing Services.
202320:3'!r Housing Elementtdpdae`e City o:f.Shc;fer.,.CA Associate. Environmental IPlanrner„!Servinq as arn.Associate Environmental Planner, John assisted with th>e (preparation of the City of:5 aftees Housing Element: to ensure the Housing Element was being prepared in compliance wiith all .state requirements, John took on several roles in the completion of the Housing Element which Included: identifying and analyzing existing and projected housing needs for ail economic segments of the community; providing a summary of the p00Puul!atiion Infrastructure Engineers,, a (Bowman company
!Municipal EEnu iii:eeriirhg Services u Jfovembe'.r9,20G3 75

Page 471 of 642 ends

J o ° l`,i'{ { o r n'o
Environmental Planner 11
and housing characteristics that contribute to the present and future housing needs in Shatter; provide goals, policies., quantified objectives and scheduled programs to preserve,. in'iProve and develop housing:attended several community meetings and participated in public outreach efforts, Mitigated Negative Declaration (MND) in compliance with CEQA and frequent direct contact: with staff of 'Various state agencies, Housing :Programs, which ion n helped develop, became the basis for annual progress reports (APR), The Hou.nsing Programs included: 1) Adequate Sites for .Affordable IHolrusing.; j Home Ownership Assistance Programs; 4) Section 8 Housing Choice Vc'ur_hers;; 5) City Grants for Special Needs Groups; 7) Code Enforcement; 8) Conservation of Existing and Future Affordable Units) 9) Streamline Residential Permit Processing; and Fair Housing Services..

Associate Environmental Planner u City ofAd h nto, G4
As part of IE"s Planning Support and Staff Augmentation Services contract with the City of A.delanto,: John provided support services to the city on CEQA compliance in preparing Ad.elantoS 6th Cycle Housing Element where it was determined that a Mitigated Negat'iv'e Declaration WIND) Would be the appropriate environmental compliance document for the Housing Element vvh cch analyzed potential environmental impacts associated with inafr4e.mentinq the city's Housing Eiement:,.

John analyzed all environmental topic: areas and where appropriate., developed mitigation u-neasiures to reduce impacts to levels bellow significance, Associiate Planner 1 City of Mrrre,rw Volley,. CA
.As pat of lE'.s Planning Support and Staff Augmentation Ser°vic.cs contract with:
the City of Moreno Valley, John provides .support to the City of Moreno Valley a5 an augment staff member. Duties include reviewing project plans submitted by applicants to determine compliance with city development standards and land use / zoning requirements. Additionally, duties include reviewing CEQA ernuiroim..aental documentation and technical studies in siipport of projects as:. well as direct communications with city staff and project applic&i.

Associates Erwir'ornmerintcai Planner I Project ii'4a¢ra9er City Bakersfield, CA in support of the preparation of an Environmental Impact Report (ER) for the Hiagemaln Industrial (Park General Plain Amendment nt and Zone Change in the City gal`Bakersfield, John has been providing support in all phases of the OKA process, including initial project planning; public notice preparation, distribution, .and filirtr�t; conducting public outreach in.clualding public meetings and hearings (traditional and virtual), Notices. of Determination and other decision documents. John collects, catalogs, anti responds to public comments and coordinates with responsible and trustee agencies, The City of Bakersfield lead agency in the event of a legal challenge, Additional (:itches include project budget and schedule tracking..

Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November. 9,. 2023 76

Page 472 of 642 ends

Ca mer Liitr kos,
GiS Analyst
IEd ucatio n
M.S. Environmental Science Si
'ec.hnoIIogy,, California State University,
Fullerton
EA. Environmental Analysis, IPnt r
College
Certifications
Data Analysis. Cert.ffic:at:h:ran, University
of California, Irvine
Basic Wetland Delineation
Certification, Wetland Training
Institute, W'is::oansin
"Expner'i na:epr'iicr•to joiningthe firm
Cameron is a GIS .Analyst who has seven years of environmental consulting experience including conducting wet and delineations, noise construction monitoring, tree surveys, nesting bird surveys, habitat restoration monitoring, with a concentration on GIS applications thereto. Knowledge also extends arnds to permuting (specifically rega:rdiing. U fSAC.IE 404 IPenmits,, RWQCB 401 Certifications, and CDIFW 1600 Agreements) and CEQA, Cameron is proficient In Wetland D'elline.atidon, CEQA, USAGE 404 Permits, RWQCB 401 Certlfnc:atkons, CDFW 1600 agreements, Arcmap, ArcG!I:S o!rtli!ne, GPS 1frimbles ,and data coUllection, ArcGI5 Collector;, programming skills in Excel, MBA, Python, R,JavaScriipt„ SQL Databases,, Tableau, Big Data, Machine Learning,.

Microsoft Office and A.dcthe IPlhotoshop.

Experience
encie
2023-2031 Housing Elenite n t Upd e II City c'f Wcasco. CA infrastructure Engineers has been hired to prepare the 2023..2031 Housing Element for the City of W ascci. Cameron is the GIS Analyst providing IS services and support for graphics and visuals for the Housing Element. He has conducted geospatEai analysis of the City of Wasco to identify appropriate si't'es for residential development according to the RHINA allocation, He is preparing the site inventory ,AF I: H analysis and corresponding figures. He conducted ADU analysis using the City ofWasco"s APRs and HCD approved methodology as part of the RHNA allocation.. 2023-20•i31 Housing ng Element Update City of,5hafter;, CA infrastructure Engineers has been (hired to prepare the 2023-2..031 Housing Element for the City ,c Shafter. Cameron is the GIS Analyst providing GIS services and support for graphics and visuals for the Housing Element, He has conducted geospatial analysis of the City. of Shatter to identify appropriate sites for residential development according to the RHNA,ailocatiion. He is (preparing the site inventory AFEH analysis and corresponding figures. I -Ile conducted ADU analysis using the City of Shafter's APRs and. HCD approved methodology as part of the REINIA allocation. 2021.2029 Housing Bement I Updette j (.7ty ofAde:Onto,. CA infrastructure ngiir4• ers has been hired to prepare the .2.021-2029 ng Element for the City of Adelanto. Cameron is the GIS Analyst providing GIS services and support for graphics and visuals for the FIcru.r•sing Element. He has conducted sgeospatial ,analysis of the City :of Adelanrto to identify appropriate sites for residential development according to the RE NA allocation, He is preparing the site inventory AFFf I analysts and corresponding figures. He conducted ADU analysis using the. City of Adelar o's APRs. and HCD approved methodology as (part of the R.HNA allocation, 2:02.1•-2..029 Housing Element Update City of Lynwood, CA infrastructure Engineers has been hired to (prepare the 2.02.1...2029 Housing Element for the City cFf Lynwood. Cameron is the GIIS Analyst providing GOS services and support for graphics and visuals for the llouusin p (Element., Hun (has'cornduact.ed geoslpatial analysis of the City of Lynwood to identify. appropriate sites for residential Infrastructure Engineers, a Bowman company ! Municipal Engineering Services November 9, 2023
7,7

Page 473 of 642 ends

Ca :ero
GISAnalyst
n L k si MS
devellopment according to the IRHN.A allocation. He is preparing the site trwentor-y AFF!-1 .analysis and corresponding figures. He conducted AMY analysis using the City of Lynwoods APRs and HC.Dl approved ri e.thodolo ly as part of the RHINA alDocaation.

General Flan and Zoning Code Consistency Project 1 City of t efl Gardens, CA Infrastructure Engineers has been contracted to assist the city in updati:nq the General Plan to ensure consistency with the Zoning Code.. The city is evaluating approximately one hundred parcels for zone change to alVow for'more mixed -use and residential development throughout the city.. Cameron is the GO'S Analyst who conducted geospatial analysis if the C ty of B:'IIl Gardens to identify inc:ex-vsiste.ncier between the General Pan Land Use Map and Zoning Map. He prepared GIS-based :naps of existing land use and zoning designations and updated those land we. and Zoning maps to correct identified inconsistencies.

Environmental Justice Element and Public Safety Elemerit Update 1 City of Lynwood, CA
GIS Analyst, Cameron is providing GIS services and support to assist in the production of tables, figures and exhibits,
Asian Garden Mail Parking Structure City ofWestminster, CA:

GIS Analyst. Cameron is providing GIS services arid support for graphics and visuals in production of project description.

Ruth Villlak bos and ,ft. ssociates 1 Ontario, `A:'
GIS Analyst / Associate Biologist. Cameron supported and assisted in conducting biological surveys and wetland delineations. Prepared maps and Cf7Mplex databases using a variety of digital data source:, incliuding the most current aerial photography,. AutoCAL], GPS field collection data, and geo..transfornnation of historic date for production of various reports,. including ing wet€and delineations and permit applications. ReYMlevved and prepared EAR and C.EQA document sections, 'project descriptions, techniciali documents, and biolioq.ic:aV documents. Utilized software knowledge iincd!uding ArcGIS i O.X, .Ar.cGIS: Online', Arc. Collector, Trimble GPS Receivers, Pathfinder Office Software, Adobe .Phctoshopand Microso'ft' office (Word, (Excel, PowerPoint).

Gil:enn Lukos Associates I Sawa Anc,,rA'
GiS'1'ec.hnician.. Cameron n formulated GiS models for wetland delineations, mitigation plans, biological surveys, environmental planning and I:arid use planning, Conducted GU.S analyses for U.,S, Army Corps of Engineers, Regional! Water Quality Control Board, and Califomia Department of Fish and Wildlife jurisdictional delineations, biological resources and impact and environmental assessments / alternatives analyses.

Prepared reievant, presentable, project -specific exhibits for reports and ulEQA documents that depict aquatic resources, biological resources, monitoring areas, (proposed iimpacts, prooposed restoration and photo documentation, Infrastructure Engineers, a Bowman c:ompaany Municipal Enyinee.dng Services I November 9, 2023

Page 474 of 642 ends

B Mi. h
r Barad , . EIT
Utility Engineer and Engineering A..ss tant
Ed'uc
M.S.. Civil and larnviirornirttnental
Engineering with a focus on: \Water
Resources, California State University,
Fullerton
B.S. Civil Engineering, Univei $iity of
:science and Culture, Iran
Regilsttrati
rig
Engineer er in Training (BIT):

California (#173797)
*Experience prior to joining the firm
bon IEiahar Baradaran has four years of experience in civil engineering that includes roadway infrastructure projects..

IExp T !Hence
B Hower Street Rehabilitation Project City ofAdekrntor CAA Engineering Assistant for desiignirng and 'planning the primary pavement rehabilitation, wateir main and sanitary sewer lines. Also designed the pavement based on the ,geotechrnlcai report and was responsible for coordinating with geotechinic:ai investigators to identify the pavement design: and requirements.

Prepared pllans, profiles, specifications and cost estimate for this piroject. Also sent utility notices and coordinated with Edison., wateir and gas companies, Bartlett. Avenue Rehabilitation Project City ofAdedcrnt'o, CA Engineering Assistant who gathered data from survey and site inspections to design and plain the main water and sewer (lines. Collaborated with client to develop water and sewer improvement (plans and profiles iin compliance wilth city regulations.

Conducted extensive research and analysis off existing infrastructure, topography and environmental tal factors to develop effective solutions., Designed and drafted detailed pan and profiles using Civil 3D. Managed project timelines and prepared cost estimate to erasure it was within budget limits and provided the (hest value, SIB Santa Fe Avenue. arid Miles Avenue I City of Huntington Perk CA Engineering Assistant who was instrumental iin sketching plla!n:s for sanitary sewer, wateir and street enhancements. This included detailed Ipl:an. cross-secti:ounai views and traffic. striiping.'Pllayed .earl essential role in helping with specifications and c:allculaiting the cost estimate for the project, which entailed updating the outdated wateir and sanitary sevweir systems to meet current standards.

CLIP Priority 21B Street Improvement t Pr'-oje+ct I City of Lynwood, od CA Engineering Assistant who created all sheets for improvements and utility relocations for the city's Phase 2 CIP Street Improvement Project. Tasks included coordinating with utility companies and conducting field investigations to obtain measurements of existing site and proposed improvements. Prepared specification package per Greenbo'ok and has developed quantities far removals and improvements for cost estimation.,
ATP Cycle 2 Lynwood Community Linkages to Civic Center and Long Beach Boulevard levard City ofLynwood:, CA
Engineering Assistant resl:?onsilbile for cre.ating the signing and striping s.h:'eet'sfor the projexct, Work involved creating the construction emotes and designing the new striping on AutoCAD.
infrastructure Engineers, a Bowman company Municipal E.ingiineering'Servic.es hiovemf erg, 2112.3 79

Page 475 of 642 ends

attar Bar d ran, EIT
Utility Engineer and Engineering Assistant
Street Rehabilitation Project City ofBen Gardens, CA
Engineering Assistant responsible for developing street cross section and base nrnap; performed field reconnaissance to inspect and verify surface indications of utilities. Infrastructure Engineers is providing design, project management, (bidding of contract, constriction management and inspection, as well as federal fund administration for thiis project that involves rerr-so• aal of existing AC baying and paving of AC pavement and concrete improvement reconstruction, including replacing existing curb and gutter, lr, siidewalk,. driveway approaches,. access ramps, and adjustment of utility covers, traffic striping, markers, pavement rrnarlking:s and curb paint i rig.

Internship at City of Irvine City of Wine, CA*
Intern Who acted as a sustainability manager assistant. Aided in: the ddevelopment of plans on drainage, road, and residential projects and helped with en's'' ron•rnerrtall studies, permitting and 'adter-n•ative analyses. Obs.erved the preparation, function and process of tender and contract documents in action and assisted civil engineers to fulfill these. Also collaborated with research oru other projects as a team member.

Internship at William Simpson and Associates 9 City of L kie Forest; CAM, brt:ern who drafted detail of sections., plans, and elevations with AutoCAD. She handled cost of meter iais; estimations, report and document tracking, project documentation, on -site project visits, and building permit applications. Bah& shadowed senior civil engineer r or-r:t, project to determinate the on -going stability of concrete stabilized footpath around a comnaercial center, infrastructure Engineer's, a Bowman company ! Municipal Engineering Services I November 9, 2023 80

Page 476 of 642 ends

Ha I,,I' e Ha
!!I
Engineering Assistant.

Educe' sin
M.S. Transportation i-' Ian rrirtg,
international University of Qazvxrn., Iran
B.S. Civil Engineering, Slhairif University
of Technology,. Telh ran, Iran
IFleg6,stratii,al •ni s
SCATS Training Course 1 IRTA / New
South Wales -Sydney- .Australia
*Experience prior• to joining the firm
Hamed Hlalbibi has 12 years of ea;perlence in traffic engineering, 'especially in Traffic Signal Planning, Actuated Traffic Signal System, and ITS systems. His experience includes drafting, and designing traffic signal plans, writing traffic signal warrants and stop sign warrant reports, creating cost estimates, generating specifications, designing street overlays, and generating conceptual imagery for exlni:biit:s iin different projects,
Experience
ce
Quiet Zone Preparation ,of P.S& r .for '1 2 Railroad f i' r;; Y Crossings City of Covina, CA Engineering Assistant. Responsible for preparation of proposed Improvement. plans fort 2 highway/ railroad crossings including quadratic gates, medians, pavement, traffic striping, markings arnd signage in accordance with CAMIJTCIL) and Metrrolink Standards.

Left Turin Warrant Studies for Five Intersections at Sdaiusoirn Avenue City of Huntington Park, CA
Engineering Assistant. Responsible for creating the (left turn warrants report and verifying the warrant conditions satisfied on the CA-MUITCD, Designed a collision diagram, conducted an analysis on the collision history of the intersections„ simulated these five intersections in S'yn.lnro for' five different scenarios, conducted pedestrian ;safety analysis and' provided a field review of existing conditions.

All -Way Stop Sign : arrant rnallysis Florence Place and Scout Avenue intersection , City of Bell Gardens, CA.

Engineering As.siistaint. Responsubie for creating the all -way stop warrant report and verifying tLie warrant 'conditions setisfred on the C A-MUTCICD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

All Wray Stop Sign Warrant Analysis ... has w neriia Road and Gotham Street intersection I CA), of,t' ell Gardens, CA
Engineering Assistant„ Responsible for creatl.ng the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCICD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation arid provided a field review of the existing conditions.

Speed Zone Survey and Speed Limit Study for Garfield Avenue CV of Bell Gardens, CA
Engineering .As sistairnL Responsible for creating Speed Survey Anallysis report in accordance wit.lh. CA-MIUT'CD and CVC. Conducted an analysis on the colllliision history of the intersection, (toad Condition Ana d +sis and provided a field review for achieving the efficient speed limit,
infrastructure Engineers, a Bowman company l Municipal Engineering Services November 9, 2023 81

Page 477 of 642 ends

H
e
Ha
i,
Engineering Assiistant
ibi, MS
Transportation Assess.mernt for the Rancho del auto City Center Project I City of Belt C Gardens, CA
Engineering Assista:n:t., Responsible for creating the1`ranspartati:on Assessment report ancludincj Project Trip Generation based on 11i'E-Ti rp Generation Manual (last edition),Project -iria.Ciistributi nRe.TiripAss,.ignrnent,Vehicle:hflilesTrraveled(VCWRT) Asses sme nt., Trafffrc Signal Warrants Study, analysis of other n'aode•s of transportation (morn-a'utoinnobiile facilities) for the project This involved using AutoCAD to create the ConceptuatTraffic Signal Plan and Access improvement .for the proposed intersection, .All_ ay Stop Sign (arrant Analysis, ,.. Bellflower Street and Lawson Avenue intersection. I Lit)t&+ idi'.11Crni'Cl;:.C/
Engineering .F1.s:silstiant. Responsible for creating the alI -way stop warrant report and verifying the warrant conditions satisfied on the CA._MUTC:D. Designed a collision diagram, conducted an an:aOysis on the colli:biun history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

All•Way Stop Sign Warrant Analysis - Stevens ;Street and Bart i tt Avenue Intersection f City ofitldeeonto, CA
Engineering Assistant. Reslaonsibie for creating the alt -way stop warrant report and verifying the warrant conditions satisfied on the CA-•MuTCD Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

All -Ways Stop Sign ttitaar'rennt Analysis --.Stevens Street and Kemper Ave +rxr intersection } City ofAd ekon tq, CA
Engineering Assistant. Responsible for creating the aall•-timay stop warrant report arid verifying the warrant conditions satisfied on the CA•MUTC.D. Designed ra collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing condition& New Traffic Signal at imperial Ihiwy and Ruth Avernnre Intersection I Cit • of Lynwood, (: i
Engineering A,ssistant,. Responsible for that design of the traffic signal, striping plran,.s., specifications„ and cost estimate for the new traffic signal intersection.. This involved using AutoC.A.D to create the general notes, construction notes,. conductor schedule, traffic signal plan and phase diagram for this project:.

Pedestrian Hybrid Bea+<':o nlHAWi'u K AU -Way Stop Sign and Traffic Sign, l' Warrant Analysis at Santa Fee Aven'nre and Weber Avenue Enter'sectioan I ay of Lynwood., C4 Engineering Assistant. Responsible for creating the PH13,. ali avay stop sign, and traffic signal: warrant report and verifying it:he. warrant conditions satisfied on the CA - WITCO..
:De:s.ign rd a collision diagranri:, conducted ed an analysis o.ri lt'fte collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.

Infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9?, 202.3
82

Page 478 of 642 ends

Michael i e a Cruz, ET
Engineering .Assistant
Education
!Es,S.. Civil IE.ngi neeiring, California State
!University, Los Angeles
Registrations
Engineer iln Training (EUT)::

C_'allufornia
'Experience fra,r ,:r to joining the firm
Experience
Infrastructure Engineers", a Bowman company f &ea,. CA
Engineering Assistant„ Performed tasks contributing to the completion of various public works projects under the supervision of a 'professional civil ,engineer registered in the State of California. These tasks include CAD drafting ./ design; grading and drainage design, preparation of plans,, specifications, and estimates (PS&E), submittal and plain check coordination with agencies, clients, and subconsu.ottants.; preparation of Standard Urban Stormw+vateir Mitigation !Plans (SrySMI?) and Water Quality Management Pllans (WQMP); quantity takeoff, earthwork calculations, and field chec:.lks.

Bellflower Avenue RehahUNie titio n Project 0 City ofActeta:ntc3, CA Engineering Assistant Assisted in the development of 'weft Mary Plans, Speciification.s and Estimate (IPS&.IE) for fhalll-depth asphalt pavement rehabilitation, including redesigning curb ramps to meet AIDA compliance. Pavement design was based on geotechnicah recommendations amd city requirements. Coordinated WO land surveyor to identify limits of right-of-way and required dedication, Bartlett Avenue Rehabilitation Project I CityofAd&Into, CA Engineering Assistant. Assisted in the development of Mans, Specifications and Estimate (PS&E) far full -depth asphalt pavemernt rehabillitatiorn.., including redesigning curb ramps to meet A.D.A compliance., Pavement design was based on geotec nnic:ai recommendations city red uiren:ents. Coordinated with land surveyor to identify limits of right-of-way and required dedication,
San Gabriel River Grreer'nway and Neighborhood d Connection Project 0 City of 8afr u,wi n Pork CA
Engineering Assistant Assisted in the development of Plans,, Specifications and Estimate (PS&E) for the landscaping of a 2,3 -mile shared -use bike trail currently under construction, Coordinated for plan. review and project compliance on behalf of the City of Baldwin Park with various governmental agencies, irncduc irng United States Army Corps of. Engineers (USAGE), Los Angeles County Rood Control District (LACFCLID), :and Los Angeles County (Department of IPubliic Works (LilCL7PW).'Contacted vendors. to incorporate project elerf.ent:a crucial to the project scope. Coordinated with the L,andsc:apµ Arclhitectural subccrn,sraftarnt to en:sure landscape and irrigation plans comply with requirements o'fthe aforementioned agencies.

Etta Dahtort arwh Green ay and I'1efghborbor d Connection Project I City of Baldwin Pork, CA
Engineering Assii.staant,. Assisted in the development of Plans, Specifications and Estimate (PS&E) for a 23 -mite shared --use bike trail, Coordinated for pllaa.n review and project compliance on behalf of the City of Baldwin (Park with various governmental agencies,. including United States Army Corps of Engineers (USAGE), Los Angles Infrastructure IEngfneers,, a Bowman company I Municipal Engineering Services I November 9, 202.3 831

Page 479 of 642 ends

Michael Dela Cruz,
Eivineering Assistant
EIT
County Flood Control District (A.CFCEr)„ Los Angeles County Department of Poblic: Works (L.AC P ), Southern California Regional Rail Authority (SCEiRA) and neighboring municipalities. Contacted vendors to incorporate project elements crucial to the project scope..

PA..Arca Engineering, Inc, City of C"arson, CAS*
.Junior Civil Engineer. Performed tasks contributing to the completion of various private land development and public works projects under the supervision of professional civil engineer registered in the State of Calif irnia.. Thr se tasks include; CAD drafting / design, grading and drainage design, low impact development (LID) design, preparation of SUSMP and WOMP, preparation of Storm Water Pollution Prevention Plan (SWPPP) reports; SliNPPP inspections,. hydrology studies, cost estimate, quantity takeoff, earthwork calculations, construction administration and support, sewer area studies,. slope density analysis, and field checks,.

Infrastructure Engineers, a Bowman company, Municipal Engineering Services November 9, 2023 84

Page 480 of 642 ends

Jr lip f gray, EFT
Engineering kksisfon't
Education
B.S. Civil Engineering with a
specialization in Structural
Engineerirng, UniversimyofCaliforrnia,,
Irvine
Regis'trati
ns
Engineer inTraining 'EIT):

California (#17h4I3)
"Experience prior O /pining the firm
Ja&i:n Murray has two.. years of experience in civil engineering which includes roadway and stcarirmiwater projects,
ctis,
Experience
ATP Cycle .5 Citywide Complete Street Improvements Project Cityof @el'Gardens,.

CA
Engineering Assistant, Jaelin was instrumental in drafting base maps from survey and assessor maps. A.11so responsible for creating existing utility maps and creating (plain cut sheets.
!kwthVerduugo Road Pavement Rehabilitation If City ofGfendcte, CA.

Engineering .Assi:stannt,. Played an essential role in conducting field project walks utiilliiziiing GIS to identify damaged or hazardous utilities,. concrete and pavement. She also checked and identified sidewalk;, driveways and ramps for proper width, Ih.eiiglht and slope. (Prepared plan sheets for improvements, designing driveways and ramps.

Industrial Commercial Facilities Program Proje cf.f3e!JGa,rdens, CA Engineering Assistant. Responsible for creating inventory and gathering data on each commercial and f:Industriall facility that meets need forty INWDES perm it. Tasks alsoincluded.coordinatirng aiPlpoliratments for inspection„ conducting stormwa:ter pollution prevention inspections of facilities, and rec.o..rd keeping photos., inspection foirrns, and notes.

Infrastructure Engineers, a Bowman company Brea,. CA
Intern, Aided development of (plans for beautification and rehabilitation projects.

J,ael"ufl also aided in the development of specifications packages„ Coordinated utility notices for traffic and rehabilitation projects, Handled quantities and subsequent of cost estimates for various roadway improvements and beaul:ifcations, Drafted preliminary design iof retaining ring wall design.,
(Internship I City of Dona Point, CA*
Capital Improvement Project intern.. Drafted project exhibits and utility rnaips with AutoCAD. She streamllfiinegd records of city property inventory, construction budgeting. and bid schedullin:g, Aided inn the development of'rc7:adwray (project plans and as-builts.

Accompanied, conducted toed walks for topography„ draiinage., and roadway damage assessment, Navigated records requests for right of way,: building plans and utility maps.

Infrastructure Engineers, a (Bowman company I Municipal Erogyneeriruig Services I November 9„ .2023 85

Page 481 of 642 ends

if r Santilla
Engineering Assistant
Education
B.S. Civil Engineering, University of
California, Vrvine
'Experience prior to joining the firm
Jennifer aiantii11airn has fora✓ years of progressive experience in design and CAD support in engineering and transportation. She h:ans experience working for civil design,. engineer₹rtg, and trarnsportiation companies prior to joinirig infrastructure Engineers,. a Bowman company.

Experience
Various Residential Street imprrav:emww.t:s Projects I City of Bell Gardens„ CA Engineering Assistant when worked on the design of pavement rehabilitation of various residential streets within the City of Ben Gardens. 'This included preparing plans, specifications and estimate for the chty to .advertise the package for contractors to bid. Other roles included sending out utility notices to coordinate 'with Edison, water, and gas companies. l,2O21- 1(122)
Arterial Street Improvement I C-it.y of Bel Gardens.. CA (Engineering Assistant who (prepared alignments, profiles. utility research, and many other items for plans and also co3'ini ntillicated With the engineering team on projects and assisted the staff engineers with their day-to-day duties. Coordinated field investigations wiith city staff and took field data measurements to then be able to map on A.ut:oc:AD and prepare improvements, establish quantities: necessary work„ prepare a cost estimate and develop a spec package for performal.9ce &d bidding requirements. (2O2'i:-2U:22.)
OP Priority 2 Street Improvement Project l ayof Lynwood. CA .Engineering Assistant who coordinated with gentechnical investigators to obtain boring and coring results to it:ieyltiify pavement rehabilitation requirements on various streets within the City of Lynwood. Other tasks included obtaining field data from conducting multiple site investigations and plotting obtained data onto AtrtoCAIi7.. (.2022-'2023)
Transportation Intern for City of Costa Mesa' C+tyofCosta ilrR50.; CA" Intern who authorized parking, film, and oversize Vrca:tiad permits. She also developed interpersornaa I skills for communicating sr lnicat.ing via telephone as well as email correspondence with the residents of Costa Mesa.

Engineering !terra for IRCE Consultants inc. CA's'
Intern who learned how to do m rkups., alignments,. profiles, utility research, and many other item 5. for plans. Also communicated with the engineering team on projects and assisted the staff ,engineers with their day. -to -day duties. Learned how to be independent in her assigned tasks, acid was self cruet}vated when given a task, Civil Design Team for UCtTransportation & D st'ri utirJrirl Services I CA* 'Worked. in a team to update and de.sicgn.A1uitoCAD drawings for UCV parking lots, parking structures„ and :roadway striping. Ailso completed fieldwork in measuring, locating utilities, striping,, and analyzing existing sites. infrastructure Engineer's,. a Bovvr'n,:uln company. I Municipal Engineering Services I November 9, 2023 86

Page 482 of 642 ends

An,_ ie Li
CAD Technician
Education
B.S. Electronics, Suzhou Advanced
Electronic College, Suzhou, China
C irtiir ra athaan:t
Drafting Computer Aided Technical
Modelling and Animation Certificate,
Pasadena City College
*Experience prior to joining the firm
Expeiri w nce
Dill Carr; urveys., inc.. Anaheim., CA.*
CAD Drafter. Anchor bolt sheet preparation. Provided coordinates to locate US. Site (location. Checked dimensions, scaied and aligned the drawings, changed Layer colors and dim to start a nevv drawing or match previous. Page setup, Ipdf and plot, export ati the CO J. a pmts data out. imported alll the data into excell spreadsheet„ data entry grids„ bbp, pattern types info„ extract data and 'processed there into AB Report, Sent to client.

GKC Engineering Corp. (Irwindale,. CA*
CAD / System Manager. Drew rough aracf detailed sc.alle plans using computer -assisted drafting :AD} equipment and software in the design of foundations„ buildings, and structures from start to finish, based on preliminary concepts„ skeltc.hes, survey points:, engineering calculations,: specification sheets, and other data, in support of engineering,: Prepared professional sheets, drawings, and documents, rt n.eet:irng contractor specifications and compliant with industry standards, legal requirements, municipal codes, and regulations. Developed plans for grading, exterior buildings, parking. Lots, st:orrn drains, street improvements, and street lighting within the confines of the property; some residential experience,. Generated cross section views; edited existing ground profiles and finished ground profiles. :Surveyed construction documents from points to drawi!rag. Worked closely with designers and drafters and supported engineering staff to ensure coordination with: interior design. Collected and processed information and data for engineering development by researching and obtaining standards / codes required by cllient and jurisdiction through interaction with necessary (personnel to accurately and efficiently devellop plans CAI Operator CA*
Drew rough :and detailed scale plans using computer -assisted drafting (CAD) equipment and software in the design of foundations, buildings, and structures from star to furnish, based on preliminary concepts, sketches, engineering calculations, specification sheets, and other data, in support of engineering. Prepared professiornal slheets, drawings, and documents, meet.irng, contractor specifications and compliant with industry standards, (legal requiienients, municipal codes,. and regulations.

Developed plans for grading, exterior Ihuuiidinc;.s, parking (lots, storm drains, street improvements, anti street lighting within the confines of the property.; some residential experience. Generated cross section views; edited existing ground profiles and finished ground Iprofiles.'Work:ed closely with designers and crafters and support engineering :staff. Collected and prz cess information and data for engineering.

Infrastructure (Engineers,, a Bowman company [ iirntmicipal IE.ngintr!erin.g Services November vember 9,.21023 87

Page 483 of 642 ends

Rick I yD. Stucheli
Director of Right-of-Wayand Lon ciServices
Education
Couirs:ework,, Allied Business Schools,
Vnc,
Courseworlc & Seuminor r, The (Real
Estate Academy,. Inc,
FHWA.-NIHI Programs
VDOT Specific Appraisal Seminars
Coursework 8f Seminars, The Appraisal
institute
Registration
Certified General Real Estate Appr•ais.er:;.

Virginia and West Virginia
State Licensed Real Estate Salesperson:

Virginia
Appraisal Experience
500-r- Eminent Domain Appraisals
Completed since 2006
Commercial, Vndustria} & Residential
(Experience
Qualified Expert Witness:

City of C harlotte'sa+'isIGe,'VA
Colonial Heights, VA
Cuipep :itCounty,,VA
F;ar;iquik.=r County,: VA
AffilitiatiOniSiMembierShipS
Virginia State (Real Estate Appraiser
Board, Chairman
Location
Fredericksburg„ 'VA
*Experience prior ro joining the firm
Riickey S tiuchell has specialized in the aippiraisaV of Real Property, since 2004 and wtlli serve as Project Manager for this contract with the City' of Lynchburg. He its qualified as an FxpertVkiritrnes.:s in matters pertaining to real estate, has served as an "Appraiser for the Virginia Department ofTransportati:on,, and as Negotiator on numerous projects.. #n January of 2017, the Governor of Virginia appointed Rickey to be a member of the Real !Estate Appraiser Board tlhrough the year 2020 and is the chairman of the appraisal board and was re -appointed through 2024, in addition, he has been a Project Manager on small acquisition projects, and a Relocation Specialist on other projiectss.

Experience
VDOT I-66 Express Larne P3'Project F.2irfax,., VA.

Lead appraiser and appraisal manager. for a 275 -parcel project.

Route 46I0 p Lynchburg, VA
Lead negotiator and relocation agent on this project. Mr, Stuch:elt handled 5 negotiations and 2 residential relocations on the project meeting an aggressive design build schedule..

Route 29Interchange Culpeper. V
Lead negotiator and relocation agent on this project. This project is being constructed to•create a. flyover anti! on and off ramps from Route 29 to Route 666 eliminating the need for a sigrrahiz.ed intersection. Mr. Stuchelll handled the appraisals for '10 of the paarce1s and the negotiation for an additional :7 parcels.

Route 7'Wide ning I Fairfi]x.. t!+
Lead appraiser and appraisal manager for a 110-p:ar'ce4 project, Mr, 5tiuche:il handled all of t:he advanced appraisals that requ r'ed significant acquisitions and oversaw as team of 2 review appraisers and 5 appraiser's on the protect.

Dulles Metro (Rail, Phase bj DC Metro. 1.

Lead regotrator and relocation agent on this project. This project involved the extension of the rail service f€'orn the DC metro area beyond •V•ysonis Corner, Mr.

St.uchnel:V handled the negotiations of 15 parcels and the relocation of .3 businesses.

Rcrfliiing: Road FaEr'fax, L
Lead appraiser and project manager fora 142 -parcel project. Mr, Stuchc;il oversaw a team of erne i 1) Review Appraiser, fiv=e (5) Appraisers, and five (.5) Negotlatiors on the project,
Infrastructure !Engineers, a Bowman company I iMurriicipal Engineering Services I November «, 2023 x:38

Page 484 of 642 ends

Chi , P v~ ck ili 'y !i S, PEI
Drainage and Storm vvoter Engineer
Education
Master of Science, Emphasis in Water
Resources, a, University of Colorado at
Boulder
B,5:.., Civil Engineering., Brigham: Young
University
Registrations
Professional Engineer: California
(#71'026)
Qualified SWIPPP Developer (QSID) and
Qualified SWPPP Prai't'rtnorr:er(QSIP) in
California
Experience prior to jorni'ng the firm
SPIQSD
Cheliisa is .a registered civil engineer and has over 18 years of experience specializing In drainage and storm:wwater quality, Her expertise spans a 'wide range of public and private projects in !Riverside and :San Diego Counties II^rciudilng devetopment and implementation of :stormwater pollution prevention plans (SWPPPs), design of storm drain improvements, analysis of hydiromodtficatiorr management (practices, arurallysis of hydrology and hydraulic models and design of test Ntalrnagerrier'nt Practices (Bias), which includes (Low !Impact Development (LRIL).) prac:.tIces:.

Experience
The Villages 'C:a'tya of Escondido, CA
implemented regionals fy.MP and drainage strategy for 110 -acre residential development tlh:at included redevelopment of former igoif course. Also inclluded offsite roadway and drainage improvements withiiin both tlhe Calftr'ans and city )iurisdic:iion for they 380 -unit development
Ballpark Vi l li a ;g a .Senn Diego, CA
Developed water quality report airnd drainage study for Ballpark Village mixed use high rise near Petco (Park: for JAN. Evaluated design options to address projects 'drainage challenges and coordinated with building team: forwater quality €BMP desiugrn and construction.. Developed stoirmwvate±r pollution prevention plain (SW'PIPP) and train'e'd construction staff regarding weekly llnslpectio n Its comply wiith CGP requirements.,
Park and Market I Scm Diego, CA
Prepared drainage study and storm water quality management plan for high profile mixed iryse downtown redevelopment block, Coordinated with building team k integrated IEaMIP solutions and green (roof for stor:rrnwatesr compliance, North Emiaarc:i deco Visionary Man Q Sore .Diego, CA.

Developed drainage and water quality, studies for Phase I of Salrn Diego's western waterfront revitalization project Tasks included preparation of construction documents to shift Harbor Drive east to create a 100 -ft promenade between E Street and B Street and improvements to West Broadway frorun the railroad tracks to Harbor Drive to create a'Grand Hair leading to the Harbor. SWIPPP development t included complex phasing and traffic control plans., Provided construction support services to revise the drainage design dare to field constraints.,
Lease Held North and Setback Park I San Diego, CAA.

Prepared 'SWPPP and w.at€!r quality technical report for downtown San Diego's waterfront redevelopment project. ,Assisted processing of tine Water Q'uallity 7echinic.a!I Report through approval by the (Port of San Diego and California Coastal Commission., Cooird!in,ated with geotecltnical and landscape consultants on measures to reduce storinrwater (pollution to Srar Diego Bay..
infrastructure Engineers,. a Bowman company, Municipal IEE:ngineeriln:g Services V November 9!, 2023 a9

Page 485 of 642 ends

Chelisa Pack, MS, PE, P / QSD
Drainage and ) to:rrn §(lief Enf jineer
Convention Center Phase llil Expansion f San Diego,. CA (Performed tlhe CEQA master drainage plan and regional water quality analysis for the future expansion of the Sara Diego Convention C.ente r to .support the Eli . The intent of the analysis is to discover the best regional strategy to. address the impacts of expansion and minimize disturbances to existing infrastructure.

Old Police Headquarters an Diego, CA
Performed the CEQA master drainage plain and regional water quality analysis for the future expansion of the San Diego Converot:ion: Ce .rater to support the E.IIR Thr='intent of the analysis was to discover the (:nest regional strategy to address the impacts of the expansion and minimize disturbances to existing infrastructure..

Fnranto and Southeast San Diego Community Plan Update l: San Diego; CA Prepared drainage and eivater quality summary report in support of the Program EIR for two community plan updates for the City of San Diego, Reviewed CEQA drx-uments and coordinated with ER team on CEQA. drainage and treater quality mitigation measures.

Quarry Creek ] Carish.00I, CA,
Developed storrnw'ater management plan / hydrornodificatiion report and drainage studies for Quarry Creek t)eveeIopraruent Master Parr, era+: r.Dnrmpassirtq 7:3 acres of development within a sensitive reclamation area. Designed and implemented regiona/ approach to drainage and water c;uality,. design, beginning at th e Tentative Map and E tR preparation stage to the final engineering grading plan stage.

Coordinated with E:IR team and city staff regarding BMP selection acid maintenance.

Front and A Courthouse o se Commons Redevelopment Saki D egaa. CA (Developed drainage study and ssl:orm water quality management plan for redevelopment of the old Courthouse block into a residential tower; Mercado dell Barrio Mixed Use Development ]: Son Diego;. CA Coordinated LID design fror'n entitlement through final engineering with a fast track schedule. LII[:Y components included porous paving and laioretention areas for marking lot,. which required detailed coordination between protect geotechanicaI engineer and ca:3'1Q:Sci]pE'. architect..

Oceanside 5pringHlll Suites Hotel j. Ocecnskte„ C,
Developed atormwater mitigation pan and BMP O&M manual for .hotel site:. (Designed Lilo' bi'Dretention BMPs h coordination with project landscape architect and geotechnicai engineer.

Infrastructure Engineers„ ,a Bowman company I Municipal Engineering Services I November 9, 2023 90

Page 486 of 642 ends

Jo ;: `;'. Becker,. RLA, AK
Landscape Architect
Education
ELS. Landscape Architecture.,
The Ohio State University, 19:78
Real Estate. Land Development
U.,C. San (Diego, 1994.

Registrations
IRecj tere€d !Landscape Architect:

California (#2.542), 3983
Ohio (ii4&», 3962
Arizona (#30593),'i996
(Nevada (#1506)
Associations
American Society of Landscapes
Architects
American Planning Association
Citizens. Coordinate for Century 3
IUrbaalrn. Land institute
rC'Immunity irvollvemr nt
urban Forest Advisory Board (Mayoral
Appointee), Member
Rancho de los IPerisaiquito.s Community
Planning Group, Past Chair
Land tJlse Committee, Chair
Park Village Landscape Maintenance
District,. Chair
City of San Diego Park and Recreation
Board (itiMVayoral. Appointee), Member
p
Jon Becker has provided management and design for ibath public and private developments in: many locations throughout the US and Arleadc.o, with most of his experience focused in the Southwest, His background i:rncIluudes both physical and policy planning,. with his physical pllaannil!ng experielrnce ranging firorra half -acre infrlll sites to several -thousand -acre walkable community deveilo.pment He designs urban settings, residential housing communities, park developments and commercial facilities., No matter how small or large the project, his focus has always been to create livable neighborhoods with a sense of place.. Jon's master plan projects (integrate ih:oausinq,, commercial., school., and park developments with multi -modal linkages, His policy planning experience has included the preparation: of specific plans, permitting for planned residential develioopments,, tentative maps, conditional use permits and ernvironlnnentadlly sensitive lands, Much of his design ex;perie€nce'has beer in support. of environmental permits such as Lllhis, Army Corps 404 permits, U.S. Fish and Wildlife, California Fish and GYuame,, and t::c:rastaall Commission permits, Jori has also served as an expert vvitne'ss and consultant in Land use planning. Additionally, he has completed many successful park projects (some award winning), open spaaces, stree'tscapes,, commercial projects and golf courses.

Experience
viara Community Park I C'arisbc.td, CA
Landscape architect of the rnaster plan and supervised the preparation of construction documents and construction observation, for a 2.8 -acre active -use community park.

DenneryRanch Neighborhood Park San Diego„. CA
Located iruthe Ocean 'View Hi%commmuunity Denne'ry Ranch Neighborhood Park provides nine acres of population -based ;park land in the park deficient community.

The design process started with twci public workshops with the community. The init.h:aU wolrkslhop focused on gathering the community's input .and vision' for the future park sites. IPIDC,. a Bowman company was then: able to weave community input and city commends into a cohesive design that was presented to the community in the subsequent workshop where we received approval from the Ocean Views Recreation Council., TIhis,alllkawed us to present to the City of San Diego Park and Recreation Board where we received unanimous approval of the project. Park design included open play turf aare,€a., drought tolerant landscaping, multiple tot Ibots, fitness stations, two half -court basketlbaalll courts, skate plaza, bicycle playground, pre -fabricated comfort station, 75 Stahl parking (lot, decomposed granite walkways with overlooks, drinking fountains, benches, picnic tables, shaded structures„ and a traa!iiheaad connection to OtaayVaalllley IRegi.o€n!ual Park.
:.launeTTownlhnomes j Laa.lo.h,icr, CA
Landscape architect responsible for preparing pllantlnq and irrigation .st!reetscaape plans for the frontage ,:€IIcsng the new residential project frontingTorrey Pines Road.

Infrastructure Engineers, a Bowman company I ititmichpal Engineering Services I November 9, 2023 9t

Page 487 of 642 ends

Jon :` ` ecI rk RL , , J P
Landscape. Architect
The st:r eetscalpe planting followed the La Jolla Shores, Planned District Ordinance requirements, the city's street tree requirements, and the city's water audft requiire meints.• To achieve a water -efficient outdoor environment, a drought -tolerant pallet of plant ma'teriial was u.used and serviced by three types of 'r:ririg atiion systems; lravr vollu,ime spray, drip tubes,: and drip emitters. Custom designs for fencing and gates were provided..

Rancho Bernardo Road Widening !San taierlo, CA
Landscape anrchitect fortihe widening of the p..ubliic street into an adjacent commercial center, As part of a Publlic Facility Financing Plan it'rrprovement project:, the stakeholders required photo simulations for the road expan:.son illustrating retaining wall design themes and landscape as well as vehicular and pedestrian barriers. The construction documents were prepared for detailed wall ddes%gn, planting, irrigation, details anci specifications processed through the City of Sara Diego,.

Pacific Coast Highway Scan D€ego, CA
PDC, a Bowman company's landscape architects provided conceptual rdesigr,:
community reviiew/approval and construction documents• The 5tf•eet:scape design included exposed aggregate and brick, irrigation, drainage and pain-) trees along the highly visible roadway.

Reclaimed Water Retrofit, City of San Diego .5rrn Diego,. CA Landscape architect providing:rrigatirxdn retrofit designs to meet the city's program to deliver recyclled water to open space and park areas. The development project. was for Maintenance Assessment Districts (MAD) and three community packs:..

Jamul Fire Station paritii, CA
Land arc:hltect/planner for the Rural :Fire Protection. District ([FPO) Fire Station site project within the larger Peacefui Valley Ranch, The 'project was forr updating the discretionary site plitan concurrently while updated the construction documents for the proposed fire statiion.

SDCR.Ali 1 La Jolla, CA
Landscape architects On thie multi -disci -0 nary team providing irrigation design for the st:neets:cape and on -site improvements along La iolla Scenic Drive and North Torrey Pines Road in the LIC.SD area. A recycled water irrigation systern was designed with drip irrigation within the public right -cif -way, the on -site parking, drop-off areas, viewing garden and hillsides,
North !Embarcadero Visionary Parr ! Sian Diego, CA
Landscape architect on the mr.rllti-r iscciulin:ary te•arn providing irrigation design for the street:.scape of this promenade along the San Diego Bay. The low flow irrigation design required detailed coordination amongst multiple disciplines in the kirban setting.

Infrastructure Engineers, a Bowman company I. Municipal Engineering Services t November 9, 2023 92

Page 488 of 642 ends

III I,, ,, 11 1 � �d il lll ll lul 'll i lll ll lll ll lll ll lll ll l 'l lll ll ll Ilmom
11 11 111 ll��l�iiilouiuimuuulllllllllllllllll111111111 •uu 111 1l lll ll lll """""" ' '
uuwu„lu ..Jplll "'^muuullllllllll uuuuuuw ���������������Imuuuuuuuuuuuuuuw II II III II III II II uulll uuuuuuuuuuuuuuuuuuuuuuuuIIIIII uuuuuuuuuuuuuulI ' � �� ��� �� �� � �� ��� �� ��� �� ��� �� ��� �� �� � �� ��� �� ��� �� ��� �� Ill ll ll l u w .. uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuw uwiiiiuuuuiuuuuuuuliiiiiiiiiiiiiiiiiiiuu1,,,,, ,,••••••1� � ail I II III II III II III II III II III II I' ��� �� ��� ���... � �� �� � �� � uuuuuuwouuuuuull ppll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll p lll ll ll ..

III II III II III II I" " """" " """" " """" " """" " "' II IIRI III II III II III II III II III II III II III II III II II I II III II III II III II III II II I II III II III II III II III II II I II III II III II III II III II II I II III II III II III II III II II I II I II III II II I li ii iii ii uuuuuuuuuuuuuul oil'
'
„diiiiii^'uuuiiii111111111 III III II III II III mumullllllllluuuuuuuuuuu m luu I II III II II I I II II I II II I II I 1 �
uuuu';"
1 111 11
uuuuuuppuuum uuuuou .. """
uuulllllllll 111
II III II III II III II III II III II III II II II II III II I IIII """"' °°°°uuuuuuuulllllllllllllllllllllllllllluuuuuuullllllllllllllllluuuuuuuuuuuuuuuuuuuuuuuwuw VIII ,,,, ,,,,, •
umpuulllllll """""
1 11 11 1 11 1 II III II I II II ,, uuuuuul
I II I II III II III !! III II III II II I II NI II III II III II III II III II III II III II III II III II III II III II III II II uuuuuuuuuuuuuuuuuuuuuluuuuuuuuuuuuuullllllll I . """"' ���������uuuuuuuuuuuuuuuullluuuuuuuulllllll i�
II II I II II I II II I I II II 1 111 11 111 11 111 11 111 11 111 1 lllhll� I ll lll ll ili II II ' II II I II II I II II I I 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 I li ll l
uuuu II I qI•
uuuuuuuuuuuu L. II
II III II II I II II II II .... IP. ommmmmmmmmmmmmmmmmmmmmMMMMMMMMMMMMMMMM ull ul lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll l I II I II III II III II III II III II II I II III II III II III II III II II I II III . ..............������uuuuuuuuuwuuuuuuuuuul ll l II
I II III II III II IIL. .. 19 11 111 11 111 11 11 1 11 111 11 111 11 111 11 111 11 11 1 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 1II I I l! !!!"!11111
!
uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuulllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll 1111111 """"' ....� I III II II 11„„„„IIII„ uuuuuuuuuuuuu°°°°°°°°°°°° ' II II III II """' Ill ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lluuW II III II III II III II III II II I II III II III II III II II .... III II III II III II III II III IJII II III II I Illllllllllllllllllllllllllllllllluuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuu"""' l ll lll ll o� ,,, , , uu uuuw �� � �� �� � � ������������uuuuuuuuuuuuuulllllllllllllllllllllluugppppppplllllllluuuuuuuuuuuuuuuuuu"�

II III II III II I II III II III II II
„I III II III II III II IIIIIIIIIoi " """"""
11 11 111 11 111 11 111 11 uuuuuuuu��,
...., 1 11 1 11 II I II II I II II I II II I II II I II II I II II I II I „ III II III II uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuul ugppIIIII, II III II II I III ��I
uuuw uuuuuuuuuullllllllllllllllllmuumm„. „„,,., ^^^^•
1 11 11 1 11 11 1 11 11 1 11
ions, R l'Ia ed Exper enc '
References
Pa • e 489 of 642

Q
al { cations, Relate !' Experience and Referenc
The proposed Hi tean'l members exhibit the interpersonal skills, level of integrity, thoroughness, proactive approach. and technical competence required by -the city. Our stare' has the proven abillity to multi -task and to work with minimal supervision that its required to meet the city's current staffing sand project needs. The tea en has a diverse experience in a variety of street iimprov'elrinent, water and sewer, storm drain, grading,: traffic, wr.rticRal construction and environmental prc:?jects, The various organizational ni,zatiornr l stru !h.lre-:,.'in thisproposal iMustrate our project Learn structure and lines cif communication.

Resumes for these staff u:'rare also provided.

Sid M i'di' a, vr,, MS E,, PE will act was Principal -in -Charge.. At. IE Sid is the Senior Prirrciipal. Sid has over 35 years of experience in engineering projects Co'verunq:a wide range of municipal management civil engineering, transpoirtatilo!n!,, public works, construction management, traffic engineering, community development and redeevelopment, parks and recreation facilitiies, and public and private land development Ski is responsible foir the direction and administration of internal services., engineering design, city :services and other corporate management responsibilities and matters.. Prior to joining lE,. Siid`.'s accomplishments included serving as City Manager,. I:)irector of Public Works., and City Engineer eer foir various cities in Southern California, with responsibilities for directing and administering such functional el:enaent:s as engineering, planning, building & safety, facilities and equipment, landscaping., streets, environmental services, transportation, transit and other municipal services.. Responsibilities also included communication with city councils, city corn mission s, other city departments .and rgover'nm rrtall regulatory agencies, utility companies, contractors, r on'sultants,, and the general public. &d has performed the entire spectrum of engineering activities, which include engineering investigations-, Longeptual and feasibility studies,:
planning /scheduling, design, specifications„ cost ;analysis, cast estimating, contract negotiations, construction management and engineering support services. Sid has s.er'v'ec as the contract City Engineer for the City of Bell Gardens, City of iViontebello, City of ilirwfrnd:aiea, City of La Puente and City of Baldwin Park. e sore epaliii, PE, LEED'GA will! ser'v'e as City Engineer and Director of Construction Services. At IE Masouad is the Principal of Construction M.anagern?nt Services. Masoud has over 35 years of experience working for both public agencies in addition to the private sector, managing a variety of (large and complex public and capital improvement projects.. He has held various leadership, positions in !managiing:a variety of projects for major public works prog•rams...As the City Engineer kJ( the City of Placentia, he was responsible for de,live'ry of many projects. As the Director of Construction Management for the Los Angeles Metropolitan Transportation! Authority, Masoud was responsible for this: southern portion: of the Crenshaw LAX Transit Project During his tenure with LA Metro, Masoud was responsible: for management of all construction can the Souutherin segment of the project, including major (utility relocations.Working for the City of Loss Angeles for 10 years, Masoud he:I:d .various positions,. managing many types of public improvement projects as well,The following is a partial list of projects that Ma:soud has Successfully managed over the la 35 years.

Douglas kgenash, P#:,,'QSP 1 QSD wail serve as Development Engineer and Water Quality Engineer. (Doug has niiore than 30 years of experience in (municipal engineering,. construction management,. contract administration design ,expferIlr:'.nIce, and regulatory c:ompliiaince. Iin'work'ing with .small jurisdictions as a City Engineer, he has been involved in all aspects of the projects that cities have designed and 'constructed..This includes coordinating with local; coualnty, state aairnd federal aagenc::les„ and v'rar!o'uls utilities to ensure successful project completion.. Douglas understands the level of detail and problem -solving skills required to complete high -profile projects on time and within (budget,. He provides this level of expertise as projects are developed, designed, and constructed.. Douglas also manages capital im.proverrients, providing quality design and management of public works !projects to cur client cities.. He oversees and reviews the designs, studies, in'Jestigatlor••`_?, plan checks siurveys, and funding requirements for projects. IHe,aiso facilitates and assists agencies in'tl the bidding process, awards of contracts, Initiation of construction and construction and project closeout, Douglas oversees proper file documentation, particularly for -federally or strate-:fulinded projects, labor compliance., funding administration and project acceptance and provides full construction Irnaianagem:e:rt,
Infrastructure Ei gilrieerS;, as Bowman company I Mun.ir:ipa1 Engineering Services ij November'<; 2i023 93

Page 490 of 642 ends

QuM: m tons ted Experie
ce and i , f r *paces (coat.)
Aldan Mcwsavi, MII3A, PE, QSP 1 QSID will serve as Director of Design Services and NP'DEES Manager. At IC Aidan is the Principal of Design Services. A.idan's professional focus is primarily in the field of city engineering and environmental) infrastructure by providing civil engineering assistance to Public Works and Engineering Departments. He works closely with cities to ensure compliance with the National Pollutant Discharge Elimination System (NPDES). Aidan has developed strategies for the efficient use of Best Management Practices (I3M.P a), thus.gaining a set of skills that not only assists municipalities with compliance but helps keep them under budget as well. Aidan is familiar with municipal protocols and works within these structures to conduct field inspections and develop annual compliance reports. As an MBA graduate, Aidan brings his academic knowledge to If. to work with the firm's Operations Manager to manage al/ Capital Improvement Program (ClP) and non-CIP protects. .

Per the RFP, IE's "Related Experience and Client Reference List" appear in the "Appendix."of this proposal located hem infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 94

Page 491 of 642 ends

...., alll III II III I
11 111 11 1"
IIIluuuuuuuuuuur"
II
IIIII..,I,IIIIIIII.IIIIIIIIIIIHI
.. IIIIIIIIIIIIuuul uuuuuui VIII "^ ' °-'
II III I I ' Iii u ,,, I ... VIII 11 11 1 ��Ii !!������,��������111110... u uuull ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll l° ° °°";; " "' I II II I II II I II II I II II I II II I II II I II I II I II II I II II I II II I II I I II I I II I II II I II II I II II I II II I II IIII" II uuuuIIIIIIl;;pa aa aa aaaa HNIIul III II III I ..... . .

II II III II II III II III I II III I 1 lu d lll ll lll ll ll� l6ll ll ��� �� ��� �i iii ii iii"II II III II III II III II I Il lll ll lll ll lll ll llh I „ „„„ .

I I I I I I I I I I I, I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I III m I l u l l l I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I II I II III II III II II 1 1 11 11 1 ,, I I I I I I I I I I„ ,,, � VIII I uuu°°°°Q ul
,,I III II III II II I III II III II III II
,, III I
w piippppppu ud llllluull III I
IIIIIIIIIIIIIIIIIIIIIIII IIIIII II IIII NIImllid � �� I III II III u uuuu u uuuu ll lll ll ill ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll llPl I III II II PII ,IIIIIIII „„ II III II III II II wIIIIIIIIIIIII I tl ll lll ll lll ll l ��� �� ��� � II III I �� �I 111 11 I I II II I II II I II II I II II I II II I II II I II II I ......

IIIIIuuuuuuuuuuuuuuu I II II I II II I II II I II II I II J II II I II II I II II I II II I II II I II II I II II I II II I I ..

I II II I II II I II ,, , Illlllllllllllllllllllllllllllluuuuiiiiiiiiiuuuuuuuulllllll I I II I II II I II II I II II I II II I II II I I .... I III II II I III II III II III I III uuu uuuuuuuuuwwuullllllU

II II III II III II
����������������������������IIIIIIIIIIIIIIIIIIIduuuuuu uuuuuuuuuuuuuulllllllllllluuuuilllllllllluuw uuugpppuuu I ll ll l ll ll l ll ll l ll ll l ii ii i ii ii i ll ll l ll ll l ll ll l ll ll l l 4 ll

II III II III II III II III II III II III II III II III II III II III II III II III II I I uuuu a uuuuuullllllllllll,llllllptllll �� � �� �� � �� �� � �� �� � �� �� � � ...... uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuw
.....,����auuuuuuuuuuuuuuuuuuuuuuuwtlllllllllllllllllllllllllllllllllllll IIIIImuuum ,,IIIIIIIIIIIIIIIIIIIIIIIIII .. ,���IIIlouuuuuuuuuuuuuuuuuuVl lllll uuuuuuuuuuuuuuuiiiiiiiii°iiiil ... 1 1I II I II II I II ,I I ,, ,, , II II1 11 III II III II III I I uuuu II I III II III I III II III II III II III II III II III II III II III II III II II I .............

I II II I II II I II II I II II I II II I II II I IIII” ,, I 111 11 111 1 I II III IH
uuuuuuuuuuuuuuuuuullllllllllllluuuuu I III II III I I II I II II I I u um� ��� �� ��� � ll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l lpll ll ll uaaIIIIIIIIIIIIIIIIIIIuuuuuuuuuuuuuuppppppppppuu1111u111111111111111111111111 I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I I . puuuuuluuulll;; p;ppllllpppplllluuuuuuuuuumul . LI III II III II I II I I II III II III II III II II I II III II III II III II III II II I II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III I IIIMIMMMIIIhhlmmmmmmmmmmll I ll lll ll lll l ll ll lll ll ll l lil °°° all IIIIII IIIIIuiIIIIIIIIIIIiIIIluuuuuuuuuIIIIIIIIIIIIIIIII ��������ouuuuuuuuuuuuuuuuuuuuuuuul� ,,,,,,IIIIII ... II , ,, II I I II III II II uuuuuuuuuullll ��w- ...' ....." III I uuuuuumiiiiiiiiiuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuulllllluuuuuuu ....' ....' uuul u° uuuuuuuuuuulllllllllllll l uu ll lll ll lll ll l 11 111 11 1„ II III II III II II ... '111111111111u VIII II II III II III II III II I Ii ilwull ll lll ll lll ll lll ll lll� il lii ii iii ll lll ll l IIIIIIIIIIIIIIIIIIIIIIIIIIuuuuu1u111111uIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII^^""""""""""""""""""""""""""""""' � uuuuu1111111„IIIIIIIII .,
I I II III II III II III II III II III II II I Imuuu u ll uuuum

I III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II II uuuuiiii!!!!Illllpuuuuuuu III .
111111uuuuuuuumudlllllllllllllllllllQllllll all
! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !! !! ! !I II I II II I II II I II II I II III II III II III II II

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I III II III I 11 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 11 uuuuu a .!"""" � ��I lou u 111 11 111 11 111 11 111 11 @ Il lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lluuu u uuuu u u uuu u uuuu u uuuu u uuuu ° °°°° ° ° 1 u ...., i iii a !II II III II I IIIIIIIuuuu,,,,,,,,1 ........

EI,!2,uuuuuuuuuuuuuuuuu ulllllllllpppllluuuuu
1111111111111111111111111111111111111111uuuuuuuuuuuuuuuuuuuuulll;;;IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ...............IIII II JII
,,, ,, ,,, ,I III II III II III II III II III II III II II II III II III II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II

I II II I II II I II II I II II I I
III II III I I I II II I II II I II 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 II I II II I II II I II II I II II I II II I II II I II II I II II I II II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I I II II III 11 111 11 1111 11 111 11 111 1i iiI II III II III II III II III II III II III II II I II II I II II I II I III II III II III II III II III II ,,.,

VIII I II II I II II I I III II III II III II III II III II III II

I III II III I II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I I II1 11 11JI III II III
I II II I II 111 11 111 11 111 11 111 11 11 1 11 111 11 111 II III II III II III II III II III II III II I� ii iii ii iii ii iii ii iill u uuuu u lll u ul ll lll ll lll ll lll ll �ll ll lll ll lll ll ul ll ... ..... ..... . 111111111111IIIliillllluulllulllllllllll II II III II Iu ll ul ll lll l """"""""'E '"I Illluuull 'Illllllli uuuuuuuuum �� ��� �� �� IIIIIIIuuuuuuuuuuuuuuw111111 II I r^^^ uuuuulll;uup°°I"I;; u111111111 , ,; I II II I II II I II II I II II I II II I II I 11 11 1 11 11 1 11 111 1 1 11 1 uul lll d lll l! III II III II uu II I ., II
ppum u 1 . Illuulllll II III II III II III II .. .,,,,IIIIIII uuu1°°° I III II II ....' uluul , .. ... ul lll II III II III II III II II I II III II III II III I 111II111111111111ulluuuuuuuulll Ill ll lll ll lll ll ll l ll uuuu u udl lll ll ll l ll lll ll lll I III II III II III II III II, I ll ll l ll lll ll lu II I �iil ll lll ll llll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll �� � �� �� I II II I II II I 11 11 1 11 11 1 11 11 1 11 11 1 u ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll ll l ll . .. 1 111 11 111 11 11 11 111 11 111 11 111 1 Mull ll 1 .. III IIUI III II II1 11 11 „" 11 111 11 111 1 II I „ IIIIIIII II I II II I 11 11 1 11 11 1 11 11 1 11 II .... . .. Illllluuuuuuuuuquuuuuul l„ p . . IIIIIII Iuuuuuuul I II Ilu1111 „„ ,,I III II III II III II II .. � 1 1 0 uuuuuuuu � � �� �� � �� �I I II II I II II I I� �� � � I Illlllllllluuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuw , ,,, ,,, ,, ,,, ,, ,,, ,, ,,, ,JII II III II III II III II III II III II III II I " . I II Ieuuuuuuuuuuuuu,,,,,,,,uuu IIIIIlul6 . uuuu I II III II II ......, uuuuuuuuuuuuw I ,,,,,,,,,,,,,,,uluuuullmull I I II II I II II I II II I II II I II II I II I I .. . I II J I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II I II Illllllllllllllllllllluuuuuuu „ uuulllllllllll 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 1 II II I II II I II II I II II I II II I II II I II I .... I II I II II I II II I II III II III II III I ...

I II ! !! !!! !! !° !! !!! !! !!I II II I II III II I II II III II III II III II III II III II „ ,1 111 11 111 11 1 1 11 1 11 11JI III II III II III II II I II III II III II III II III II II I II III II III II I III I III uuull ll lll ll lll 6 ° ° °°°° ° I11 11 111 11 11 1 II III II III II III II III II II I II III II III II III II III II II I II III II III II III I1 111 1 I� ,I ��, ,I III II ,I„ II II I II I II II I II II I II I I II II I II II I II II I II II I .: , III II II1 11 111 11 111 1I III Illuuuuuuuuuululluulllllllllll � 11 1 III ° °°; ;II IRII II III II III IPII I II III II I11 11 I II II I II II I II II I 1 1 1 11 111 �� � III II II uuul .,,
.�, I ll lll ll lu l ll � lullllllllllluuuuuuuuuuuuuul ,,,,,,IIIIIIII ... IIII Il ll lr�ll ll ul � �� ..�. ���•.�� � ��� �� ��� �� �� ��� �� � I� � �� �� � ��������� Iuuuuuuuuuuuuuu C _I � IIIIIIIIuuuug l �.

Ilouuuuuuu,,,,,I,�� 'I II I II , 1Piupulu
ii ii iii ii iii ii i i ii iii ii iii ii iii ii iii ii ih II III II III II III II III II II I II III II III II III II III II II I II III II II II III II III II II I II I .........., uuu um1 uw=i
w uuu II II uuw ii' l ill ll lll ll lll ll i6 ullllwu Il ll lll ll lu ml luuluuu uuuu 1 u uuuouuuuuuutll111l11 I ,. , I �, IIIIIIIIIIuuuuuuuuuuuul� �.

II III II III II III II III II III II III II III II III I I i°°°°uillllluumul lullplu I III II I Illuulllllllllllpuuuuuuuul _IL.IIIII II II 1 1I II III II III I .. aall I III II II uuum I III
I �� „IIII,„������ d u1111n� II II uu I II II I II II I II II I II II I II II I II II I II II I II o 1 1 uuuuuuuu1u11111 �� 1 111 11 1 I ., II II III II III II III q;!!pll I II II I II I I uuuuuuuuuuuuuuuu111111111111 u111111uuuuuulllllllll JI VIII II I .. I muuuuuuuuuuuuuuulllllllllllllllllllllllllllllllllllQ lllllllllllllllllllll ppp I II II I uu111 uul uuuu IIIIImuu111111H1110IIIII a .����„ tlu111111111111 1 11 1 I II III I , ". ,, , r .,,pppuuuu°°°°°°°° IIY . ' ���uulllllull VIII I;. duuum ppluWl pllluuum
I I1 11 1 11 1I I II II I II II I II II I I Ilul lllllllul 111111IluuuuuuuuuuuuuuuuuuuuuuulluuuullllllllIIIIIIII uulll I II II I II I I I II III II II I I 11 111 11 111 11 111 11 11 I I II I II II I I I II II I II II I II II 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 .. . IIIIIIIIr11I11IliI ',u °'"ul ouul111ullaplplll;ii .' II I
q pu d lll ll lll ll lll uuuuul1111
.H
.,IIIur ,, III I II I III I
u II I I lulu uu uum uuu II II ��� �
lu .
. II 1 11 11 1 II I I I ' I II I II , qu
uu11 mm
lop
a lll ll lll ll ....' u1111 11u ' I' II
p1 VIII II III II III
muuum1111 uu
VIII I �I III I
II uuuu uuuull

IU II I I II III II III II III II
IIII,,,. uu ,� II utll �1 . , u„ II„ ...IIIIII
ffiffi III II III II III II III II III II II' II III I 111 11 1,,

II III II III II II
..�IIdu1111I�iiiiiiiiuumiallaaaauuuuuuuuuiiiilll� � � �� �� �' II II III II III II III II III II III II 1
I I II II III II III II III II III II JIIIII,',lii IIIIIIw�, . oluuuuuuaaa I II 1 .., II� �� �� ���
VIII°'

III, I III II III II III II III
II iuul,pmillllll' 111ouuuuuuuulllllllllllllllU uuu iuiiii„luallllllllllllulldl ll Cost a
I II II III II 11a
rI�IIII iIIM""
Pa • e 492 of 642

c
d ''""" rici n
A. City Retainer:

City Engineer
B. As -needed Traffic Engineer:

PROPOSAL PRICE SHEET
$ 5,320 per month
Attach the hourly rates for the various classifications that would be billed to the City under this category.

C. Public Works Right of Way. Permit Management and Inspection:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

D. As -Needed Water Eric ineer:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

E. As -Needed Development Engineer.

Attach the hourly rates for the various classifications that would be billed to the City under this category.

F. As -Needed Public Works/Capital Improvement Program Projects:

These services will be billed as a percentage of a project's construction cost. Specify the percentages for the services listed below for construction costs less than $499,999, construction cost between $500,000 - $999,999, construction cost between $1,000,000 - $4,999,999, and construction cost over $5,000,000:

1. Design Services %

2. Project Management and Administration % 11E.Pears on he:. tlI ;awiirig.p qe a

3. Funding Management _/o

4. Construction Management _%

5. Construction Inspection -%
For Labor Compliance, attach the hourly rates for the various classifications that would be billed to the City under this category.

G. As -Needed Other Public Works Enoineerinc Services:

Attach the hourly rates for the various classifications that would be billed to the City under this category.

H. NPDES Stormwater Compliance Consultant Services
Attach the hourly rates for the various classifications that would be billed to the City under this category.
42 infrastructure fingir ei rs,, a Bownnan company I .Municipal Engineering Services I November x,, 2023 95

Page 493 of 642 ends

Cost a 'id Price' rg (c nt.)
Due to our on -going partnership with the City Bell Gardens, ens, we are providing 10% discaourrrts on a 1 the hourly rtes listed here. .Ali other rates will be based on the Infrastructure Engineers 2022 - 20.3 Hourly Rate Sclhedule.

The method of compensation toT each type of s:eirvuce is as follows:

City Engineer Retainer $5,3.;1!0Ilunp sum per month
For the. proposed retainer fee infrastructure E.nganee.rs proposes to provide 8 'hours per week of City Engineering services.

The City Engineer / Deputy City Engineer will .attend ail! City'Cou!ncil n•neeturoq:s and anyTraffr,c Commission meetings., .as regt.ceste:rd by the Director of Public works. During other hours of the week, the City Engineer will he available to !respond to any city inquiries via email or telephone calis..The retention payment nt wilt provide the city up to 35 hours per month of City Engineering Services. Any hours beyrc nit .35. hours will be charged as extra at the following discounted hourly rate:. t;ityr Engineer: $178 per hour, DiscountedRarte for Reti Gardens: $150 per hour Deputy City Engineer $169 per hour. Discoun tee:raffle for &f Gardens: $:i,52per hour As-lsileeded Traffic IErrgineer: H urlyr Rate per Hourly t iin ly Elate Schedule The Traffic Engineer will he .available to respond to any inquiries fro!rn the city by email or phone calls during any business hours and attend any traffic commission rne.et's!ngs that the Director of Public Works may require. The discounted hourly rates for these services Mill be as follows::

City Traffic Engineer: $'l6!: per hour. Discounted lode liar Belt Gardens: $152 per hour Deputy City Traffic Engineer: $1:61 per hour. Discounted Ratefor Bell Gardens: $145per ,flour Water Engineer: Hourly Rate per Hourly- Rate Schedule
The Water Engineer will be available to provide engineering consultation on various city water matters on a.rr tars -needed basis,.

The discounted hourly rates Forth.ese services will be as follows:

Senior Water Engineer: $'I76 per hour. Discounted Rate far Ben Gardens; $758 per cur Water Engineer: $158 per hour. Discounted Rate for Bell f. Gardens: $T•42per hour Development Engineer Hourly Rate per Hourly Rate Schedule Services may include participation al: meetings, attendance at the Planning Commission meetings, review of development plans or other .assignments from the Community Development Department.

The discounted hourly rate for these services MB be as follows,:

Development Engineer; $169 per how. Discounted Rate for Bell Gardens: 5152per hour PublicWorks Right of Way Permit Management and Inspection: $113 perr hour (hourly rates) The utilities / public: works permits, and inspection services will be provided at the following discounted rates:

Engineering Technician: $106 per hour, Discounted Rate for .geld Gardens: $:45 per hour Per!rnit. Inspector: 113 per hour. Discounted Rote for Self Gardens: $102 per hour PublicViiork.s Projects
Other public works studies, reviews and projects not listed here will be charged at hourly rates as listed in the infrastructure Engineers 2'0.22? 2023 Hourly Rate Schedule Iatt:ached)..A lump sum, not -to -exceed fee will be provided at the stare: of each task.
infrastructure Engineers, a Bowman company I Municipal Eng rnieeriing :Services I November 9, 2023

Page 494 of 642 ends

c
st
and Pricin
(co
Capital improvement Projects: Percentage of the totall cost offfinal contract construction Capital improvement design fees Wiil' be based on the estimated cost rzf constriuctiicuru, Once the project iis defined, the engineering team will estimate the construction cost and„ in accordance with the clhart below, will set the design fee. After finalization of design: and upon ra.ceivh.i formal bids forconstiructioin of the project:, the actual design fee will be determined, and the engineering design fee will be adjusted to reflect the exact amount Construction costs will be the average of three (3) lowest[ bids ffinr the projects If there are only twin Q2J' bids, the average of two (.2) bids wall Ibe used for construction cost.
• Construction cost fe.ss than $49.9,999 the design fee will he 8% of the construction cost. - Construction cost $500, 000 $999„999 the design: fee will be 7i r, of the construction cost.

Construction cost. $1 „000,000 .. 4;999,'999 the design fee will be 6% of the construction cost.

Construction cost over $5,000,000 the design' fete will be 5% of the construction cost.

In addition to these percentages„ Infrastructure Engineers fees for program management, project:management and administration wit be 4% of the construction cost, :2% of the project management will Ibe charged during design phase and the additional 2% will be charged during construction phrase of the project..

In addition., funding marnage ment: Wit Ibe 1.5% for local funds rairrd ;p„59ts for state and federally funded protects. r- f of the fund irnanagernerut will be charged during the design phase grid the other hall:wilt !be charged during the construction phase of the project,
Program Mainagetr'L.IE n:0:d Manager.:

A'pirogramn manager / project: managers role for every project in various stages of'the project is as fo.11lows:
✓ Identify the funding for the project that will meet the funding eligibility. • Obtain funding :approval from the funding ,agency,
• Work with the City's Finance Department to clear the budgeting objectives. s.

Resign Stage:

Work with Public Works Director to generate a concise project scope.. • Work with the' design group to get the pnDjE ctt designed and ensure that the project will be within the time and budget established,
• Draft the staff report for the approval of the design.. !t i� rl t rT gi. � t�!PIXa
▪ Advertise the project for bids.
• Work with City Engineer to open bids and provide bid analysis. (Draft the staff report for approval of the lowest responsible .and responsive bidder, Construction stage;
• Work with the construction manager. to ensure the project objectives are attained,. • oversee the construction process and work wiith funding agencies when necessary.

Draft the staff report for completion of the project.
infrastructure !Engineers, a Bowman company [ NIuniicipaaI Engineering Services I November 9, 2023 97

Page 495 of 642 ends

Cost an
Pri d i . g (co
Notify the County of the final City acceptance of the. project Construction AllErrnagernent and Inspection: Pefcentay e of total construction cost Upon on receiving the bids for the construction of a capital improvement project:, the engineering team will prepare the fee for construction management and inspection services in accordance with the following chart, The fee will be calc:u6ated !h .sect on average cost of the three (3} lowest bids and, if there are only two (2) bids, an average of two bids will be used.

Construction cost less than: $499.999 the CM services 2..5%.+ linspection :services 4.5% for a total fee :7f 7% of tlbie construction cost::

Construction cost $500,000 - $999,999 the CM services 2,5% + insspect:ion services of 3..5% for a total fee of 6% of the construction• cost.,
Construction cost $1,000,000 - $4,999,999 the CM Services fee of 2.5%+ inspection services of _i% for a total fee of .5.,5% of the construction cot.

Construction: cost over $$5,000,000 the CM services fee will be 4.5% of the construction cost.

Labor compliance will be charged on an as -needed basis and based on actual hourly rates of $105 per hour per the Hourly Rate Schedule::
lclF'ID S:: Hourly rates
Ail NPDES services will be provide on as -needed bases at the following discounted; rates:

Program Manager: $168 per hour.

Engineering Associates: $135 per hour.

Inspector: $106 per hour,
Discounted Rate for Bell Gardens: :$1.5 i per hum -
Discounted Rate for basilGard'ens: $1.22 per hour
Discounted Rate for Sell Gardens: $95perhour
Other Services: Hourly rates not -to -exceed a negotiated lump s ir Other fees vvi:ll be based on l.nfIras:tr'ucttire Engineers 2.022-_' 2023 Hourly Rate Schedule attached to this proposal..

Civil Engineering Plan Checks: 65% of the plan check (Fees, based on Lo:; Angeles County's latest fee sicheduule and hourly rate. if the city uses its "City„ Fees" for public works projects„ then civil ervglrneerriing fees -will be charged at 90% of those city fees.

IP'lanl check fees include first, secondand third plan checks. Fourth and all sub.serluent pllan che.c s will be at the plan checkers' hourly rate. The rate provided here is Infrastructure Engineers' di.scourated rates for the City of Bell t:i.ardens only, due to our long-term relationship with the city. Expedited plan checks will be provided at 90%of the plan check fees. Fourth and subsequent plan checks will be charged at 1.715 times the normal (hourly rate., Plan Check Engineer: $1.50 'per hour DiscoaaratedRate for Ben Gardens: $ 'BS per hour Notes:

Land surveying, gecxterchnical services, material testing and potholing for capital: projects will be provided by siulbconsultants.

The fee for these services will be a negotiated cost +1 S%..

Any other suhcorrsu[tant services that aright be needed will be charge at a negotiated cost -I-15"'i;,.

Hourly rates and the retainer fees are SUbie:c't to increases at the annual Co n:surnne:r' Price index for Ali Urban Consumers (.CPI-U), Los Angeles area increase rates or a 5% increase., whichever is t;1:r ate•r effective July t, 2024 and all subsequent years, Infrastructure Engineers, a Bowman compa Municipal Engineering: Services November 9, 2023 98

Page 496 of 642 ends

Cos ;, d Prici
g(
c
2022-2023 HOURLY RATE SCHEDULE
(effective PUitarch t h 2022)
In Charge $238
Civil Enginrler!r ore fit l:diigirweering
IProject Manager
Principal Engineer
Senior Engineer
Sailor Plan Check Engineer
Plan Check Eng !a
Aserci a Engineer
Assistant Engineer
Engineer! , Associate
E I ra needing Assistant
GIS Arnallyst
CAD Maur : 'r
CAD per
CAD Technician
Engineerng Technician
Pri Trfie Engineer
Senior TraiSc Engineer
Traffic Engineer
stainhlas water/RITES
Senior Engineer
r Engineer
Pwtlm Manepr (V1POES)
inspector (NPDES)
Envir Scientist
Suleying
Protect Wager
P , .' ' Chocl
(Sebdivition & Survey Doman w.

Survey Analyst
Survey '!r 12 -man)
Survey Cree
(2 -man„ pra►elirng wages)
Consirudion Mar event
Gemini r ' finnan
Want Engineer
ScheduleriCordroller
Coordinator
kor PW Otaserver/irrspector
Senior PW Observer/impala
mini
PW OIV>serrerdfnspeccktr
Ptw Obseover/lnspechar
$185
$180
$170
$175
$1 '
$155
$145
$135
$115
$150
$135
$110
$10O
$185
$170
$150
$1 r.w
$162
$150
$238
$278
$1
$1
$163
$1'
$130
$191
$113
$159
Community Develepiment-.--
Erviromental & Planing
Director $1
Development a Manager $1
anager
Planning Manager
Principal Planner
Senior Planner
Associate Planner
Assistard Planner
Rennin Technic'w
C:0 EPA Specialist $175
Envir nmenbV $170
kw Environmental (Planner $185
Environmental Planner II $155
Envirvnmenial Planner I $144
Envirrarvneidal Technician $ 100
lMunicipai Engineering Smolt
irwb lm City Manager
Ai 19
puty Manager $197
8 City Traffic Engineer $169
Deputy City Engi n .'r $169
Deputy City Traffic 'r V� $161
Plan ' ' ° ,cic Engineer $178
GIII� M gear $155
$178
Assad '' n®sr' $1 r,
Engineering ec° I $142
Engineering ,: 'slant $118
Engineering Technician $108
Building & Sday
Building Meal $175
Plan Clack Engineer $165
Landscape Plan Cedar $162
orCerll8ed Specialist $185
Mitred Mss Specialist 1155
Plans Wainer $145
Code Enforcement Man
Code Eniortement Otter
or Building inspector
Building in. w r
Grading inspector
Counter Technician
hF
IP*NFIF Aa'rRuCxl.aRE

ENGINEERS
a Bowman company
mummuuwommiummusoloommounirminswesommuunrarammoommeapinmi Fire Prevention
III Marshall
like Inve r
Eke Plans roar
Senior Fire [nape' „F
IFlre inspector
Cour,13,r Technician
wNrn hiieeliiraI Services
(director
Sludk Manager
Senior Project •u- ° r,::r4
Se Architect
VPreject Manager/Project Awaited $155
Senior Job twin $126
Qr 105
a ter Captain $$90
Program ManagernenV'Pubiic Outreach
Program D °'r 'r+ $184
nor $150
ja Specialist $145
Prograie Coordinator $135
$120
$125
$125
$85
$133
Mgr Compliance Coordinator $105
l ministrali a &. Clerical Services
Q aW ,,r:rlStup l $108
Assisted $90
malt T
O i' Charges
Bakery $110
MV r,: a (Cur≥,ent federal guideline
the of billing)/Mille
Travel Cost + 1596
Reimbursements Cost + 15%
$i63
$153
$139
$12$
$145
$127
$127
$120
$105
Ivan
P rapper
Meech Specialist
lrrtarpreterftransirder
Production . nt
Fund Admin
Ion
$165
$154
$143
$120
3 $
$176
Additional bring clan uNecarica s may be added to the above trstthroughout the year as new positions *rQ mated. The above schedulfe la for studied time. Overtime orris be charged at 1.5 times. Sunde2rs and Holidays are charged at 2.0 times the standard tine. Deposition and court =apsaranass suie toe charged at t5 tines the listed billing rates. Hourly rates and the retainer ices are subject to increases at the annual Consumer Price index for AU Urban Consumers (CPI -11)„ Loa Angeles County eras increase gauss or a e% inncrease, ewhrchsver at greater, affective Jury 1, 2024, and ail sun , ..,., rent years, WM ode inform the city of the rail increase by A ,, ; of each succeeding year., MIN
�� II ii�ll mlrl
rol e
�n , eurla6i11PIti5Crr Zt r 9y Ir "rc c rn
Infrastructure I nginr. rs,. a 13ouvrrian company f Municipal Engineering Services [ November 9,2023 99

Page 497 of 642 ends

111 11 111 11 111 11 111 11 111 11 111 11 111 1 11 1I I II III II I 2121 2121.., .,
111 11 111 11 111 11 111
uuiiiiiiiiiuuuuuuuuum i ii iiu1 111 11 11
1 111 11 111 11 11 11 111 11 1 11 11 111 11 h , ,
HimmmmmmmmmmmmmmmmmmmmIHHimmmmmmmhIIIIIIIIIIIII 1 1 11 11 1 11 11 1 11 11 1 11 11 1 111111111uuuq
11 11 111 11 11 11101111

II III II III II III II III II III II III
hill
I III II III II III II 'I""" 1111111111111 111..
u11r^^
2121.. uw l' ,,r
����������muuuuuuuuuluuuu1111111pllllllllllllllllllllllll.........., 1 111 11 111
11 11 111 11 111 11 111 11 111 11 111 11 1 111 11 111 11 111 11 11 11 111 11 11 1 11 11I II 11 11 1111 11 111 11 111 11 111 11 111 11 111 11 111 11 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 iHimmm1 11 11 111 11
III II III II III II I 1111
11 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 1I luuup11l IIIIIIII ....uuuuuuiiiiiiiiiuuuuuiiiiiiiiiw
1 111 11 111 11 111 11 111 11 11 1 11 111 11 111 11 111 11 111 11 „ „ „, � �� ��ll lll ll lll ll lll ll lll ll llw ""
"""""""1111111111 Illlllllllllllllllllllllllllllluuuuuuuuuuu � �� III II III I 11 11 111 11 111 ilim �� �� �
, 11 1 1
uuuuauuuu111111111 umIp' „„
„„„„,,;,, i
d II III l1 1II p III II III II III iggllmlllhhhhuumllllllhi uuu 11 ��� �� �� � �� ��� �� ��� �� ��� �� ��� �� �� � �� ��� �� ��� �� ��� �� ��� �� �� � ii uuuu u uuuu u u1 11 ;;; ;; ;11 1 11 111 11 111 u w 1 uuullllll hu
11 11 11IIIIII 11u1,111111111 VIII II II 1P1 ;; u u u1 u 111 j1 1;; 11 111 1' I m uu11 11 1111 111 11 111 1 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 1 �o o� 1 II I II II I II II I II II I II II I II II I II I 1 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 1 ", ,, ,, ,,, , ;� �� � III II II I II III I""
1 �� �� � �� ii i ;; ; 1 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 1 11 11 1 11 , II II I II II II H "' """ 111111111111!!!!!!11111111111 .. 11 11 11
2121
IIIIII �liuuuuuulll;;;;;;;;; 111 11 11 I II � !II II III II II I I """" "' 1 1 11 11 1 11 11 1 uu111o11111111111111uuuuuuuuuuuuuuuuuuuiow ,��,....,,,,,m mu VIII � �� � �� �� � �
Illlllllllllllllllllllllllllllllllllllllllllllllllllluuuuuuuuuuuuuuuuuuw 1111111111111111111111
�� ��� �� ��� �� ��� �� ��� �� ��� �� ��� �� ��� �� ��� �� ��� �� ��� �� ��� �ou u uuuu u uuuu u uuuu g lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll ll I II I II II I II II I II II I II II I II II I II II I II I II II I II II I II II IIIIIIIIIIIIIIII""""""" """""""""' „ II I II III II IJ II III II III II II I II III II III II III II III I II uuuuuuuliuuuuul I III II III II II ii iii ii iiPJ uu uuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuul I 11 1 11 111 11 111 11 11111111 11 1u 11 111 11 111 11 111 11 111 11 1I I II III II III II III u 111 11 11 1 11 111 11 111 11 111 11 111 12121 . . 1 111 11 111 11 11 1 11 111 11 111 11 111 1JII II II I II III II III II III II III II III II III II III II III II III II III II II II II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II III II II I III II III II III II III II III I� uu u lu u uudll ll lll ll lll ll lll ll lll ll lll ll lll ll ll l ll lll l 2121., ul
111 1 tl l l l l l l l u u i i i i i i i i i u u m i i i i i i i i i u u u u u u u l l l l i i i 'i'i 'i i i i I I I I I i i i II II III II III II III II III II I 11111111
muuul lluuullllllll 111 1, 1 VIII luuuuuuuu 2121.
uuuuui iiiiuiillluuuu1111111 uuml VIII, VIII
11 11 111 1
111 11 111 11 1
11 111 11 111 11 111 11 111 11 11 1 11 111 11 ,, 111 11 111 11 1 mIl l 1 11 11
11111111111111uuuuuuuuuuuuuu11 H hh
H.
uud I III II III II III II III II III 11 11 1111 11 2121 luau i ii 1111 III I II I I II III I I
11 11 1 11 11 I 11 11 1 11 11 1 1 uuuuouuuuuuuuuuuuuuuuuuuuumu11IIIIIIIIII maul III II III lu ull ll ll l ll 111 11 111 11 111 1 ul
uuuu
1111111 ll, 1 111 11 111 11 111
uuuuui uuu11iw..'
111111I11u;; ;1
l diiiiiiioml 11uuulj
m 11 111 11 1
" � a1 11111111°11 11111111 1 11 11 1 1 11 111 11 111 11 111„ uuuuuuuw ..� Illuuulw 1111
; ;;pull 1 11 11 1 11 11 1 1
e1111 11 III II II I II III 11 111 11 111 11 111 11 11 1 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11111 1 111 2111.,
...,��luuuuuulpll1 1111111uuuu
dull III IIii ii il i iii i 6
2121.., „,,,1111111111111111111111111111111111111, 2121 ........, ...IIII., uuuuuuuuu111...1111111111111,
1 111 11 111 11 11 1 1 1� � 2121.
1 11 11 1 11 11 1 11 11 1 11
11 111
2121 111 1 Ilouuuuuuuuuuuul u II III II I; „�„ d1 i111 1 � � �� �� � �� uuuullllllllllllllllllllllll111111111111111111111111111111m ,, ,, ,,, 11 2121.., � ��� �� � � ��� �� ��� '� �� � ..���"� 11 11 111 11 111 11 111 11 1
III II III II III II II �� �� ��
u111111m1111m IIIIIIm
„„„... 111111IIIIIIIIIIIIIIIIIIIIIIIII11 u1111111111111111111111m111111 "' 11111111111111111111111111111111111111 111111111111111111111111111111111111111111111111111111111111111111 mmmmmmmmm
1 11 11 1 11 11 1 11 11 1 11 11 1 1 p1111111111111111u1' uuuu IIIw II
Ill 111 1I III II I I,I 11 111 1 1 1 m1

IIHHHHI
., II III II II
11HHHHH11111111111111111 uuuu um1 ,; ,11 1 1
111 u.IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII." HI uuuui

II III II
111 11
ll ll ll 1 11 1 II
„„„ II III II II
l , ,
11 11 1 11 11 1 11 , 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I I, 111 1111111 1111111
mm mmmmIIIIIIIIIIIIIIIIIIIII11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIImmr „,

II III II III II II I II II
2121 2121.,

II I I I I I II II I II II I II J II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II „1111111111uuuuuuuuuum I III II III II III II III II II I II III II III II II u lll l lll ll l�� " I I II II I I 1°' u uuuw '�""'^^�auuu111111111111111111111IIIpuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuuulw, ll ll lll ll ii u
11 1 llllllllll 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111' . !� , � I II II I II „1 uuuu �� �� ��� �� 11111111111111 i ii iii lu u "' 1111111 ., � i1111111 !!!!!!f 111 1 11 111 11 111 111 11 11 11 1 111111 „ III II III I 1„ 1111111uu111111uuuuuuuuuuuuuuuuuuuuuuuuuuuum � ��� �� ��� 2121 ,„I 1 2121
111111°°m .li
hu:11111111111V ' 11 111 11 '
uml ul
H..111111111111111111111111111111111
,
��wuuuu;; 2121 GIII
r Iti1 1 x,11 or E ceptio s
aJll
Pa • e 498 of 642

A
wf'
r
E c
pt
HiS
ADDITIONS OR EXCEPTIONS TO THE CITY'S REQUEST FOR PIROPOS w EL 1E has no additions or exceptions to the provisions and conditions of the city's .standard professional services contract. infrastructure Engineers, a Bowman company I Municipal Engineering Services I November!,. 2023 PUN

Page 499 of 642 ends

HI I II II II ,, , m
uuuuuuu llm l !I II III II III
Ihhh!u11l . ., ouuuulllll911111 uuutl !Illil ll llui liul l l ll l l lltlmdll Hoop^I' Haul! IIII" II III III II III II I uuuuullllll IIII IIII""' .. ..

II ! III II III II II �I����������auuuuwuuuuuu ""'I I; ..� ., IIIIIIIIauuuuuuuuuuuullllllllHHlllluuw Il ll lll lr III III I !! II III II II I III II Iu i VIII Haul I 1 11 11 1 1 II III II III II III II III II III II III II III II III II I III I I !! 'l lll l ll IIII" !IIII II III II I ,iii
191 1 11 11 1
iiiiiiiiiiilllllllllllluuuuuuuuw � �� � � " �
III l uwiiiilllllllllllhhhIllm uuiil�l
ul ll lll ! ' 1111! IIII uuumllmu HH
I II 1 111 11 uumuuuuuuu (I III II III II III � ��� �� �� Illllluwiiiiiiiiiuulll ll ll lll ll l�ll lll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll ll l ll lll ll lll ll ll l lllll ll lll ll lll l l ll lll ll lll ll ul ll lll ll lll ll lll Il ill uuutlUw lllllw uuuuulll ol!! VIII II I !I III II III „ w II II I II I , I III II II "'
IIIIIIIIauuu u uuuu ll lll ll lll ll lll ll lll ll lll l1 11! II III II II III 11 uuo um 11 I IIIIIIIIIIIIIIIIIIII°uuuu II ii iii ii iii il lll ll lll I III II III II I II III II II Haul"` 11 Il lll l I II I II II I II II I II II I II II I II II I II II I II II I II II I I iPll lll ll lll ll ll "'"' I lli uuuu""III"Illuulipul IIIIIIII l ll ll l ll ll l ll ll l uuu IIIIuul uuoHINIIIHIIHuuuuuuuuuuuII11111111111111 I II III I p ill Il lll l1 111 11 lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lli ii ll lI �� 1111 l l!lluuuuu1111„ uuu! Ill IIpppppppuuuuuuuuuutllllllllllllll ° '•
uuplp ullll,
I II IIIIIIIIIwHIIIIIIIIIIIIIIIIIIIIIIImIIImIIIIiuuuu9IIII IIII1111IIIIIIIIIIIIIII umu
111 11 11 „, uoouloo°' luuulllllllllllllllllPj�III I II III II PI l . IIIIIIIL. !II II III II
I II II ll ll lll il lll

I I II II I II II I II II I I III II III II III II I
II .... .... umuu ullduullluullll luuuuu
I II II I II I IImIIIIIIIIIIIIIIuuuuuuuullll uuw uuull ll lll ll lll ll lll ll lll ll 1 1 11 1 1 11 1I I II II I II II I II II I II II I I1 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 1I I II ��� � lauumuuuu I I II II I I � ��� �� ���
II III II III II III II III II III II III II III II I uuuuuulllll III illuullllglpl I III II III II III IIII IIIIII IIII IIIIII II III II III II II !I III II III 11 11 111 11 11 IIIIIIIIIIIIIIIIIIIII I II II I II IIIIIIIIIIIIIII uuuuuuuII111111111111111HHHHIIIIIIIIIIIiIIliiiiiiiiiIIIIII!!!um II9 m! III II III II III II I IIII

III II III II III II III II III II II I II II I II II I I II II I II II I II II I I ..._',uuuuuuuuuurllll ..

I II I II II I III II
1 1 11 11 1 11 11 1 11 11 1 .„,
ugllIII Illllluu °°°°uu uIIIIIIuiiiiitlllllllll IIIIIIIj°° .. 111 11 11
un I II III II II I I II II IIIIIIwIIIII II ..,
uuuuuuull„' ..' ...

III II III 1 111 11 111 11 111 11 111 11 11 1 11 111 1 III I 11 111 11 111 11 111 11 111 11 1"I III ,, l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l H m I I I I „ III II III II III II II I II III „ „I I. I 1 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 II III II I�� �� ��� � a l l I II II I II II I II II I II II I II II I II II I II II I II II I II I ll l ll ll ll ii ii i ii i ii ii i ii ii i ii ll l lll llluwuuuuuuuu III I II I Il l ll ll l ll ll l l l l ll l� � �
I II III II II III III II I I II III I Ill ll ll l ll lll li iii ii iii i �� ° °ul H H H H u u l l l l l l l l l l l! l l! I I I I I I I l! 1 1 1 l! 1 1 l! I l l l l l l! l l l l l l l l l l l l! !! !!! !! !!! !! !!! !! !!! !! !!! !! !! I I I I 'I IlluuuuuuuuuuuuuH111111111111111111NJ11111111111111111111111111111111111pIIIIIIIII ' ulll ... ...., uuuIIIIIIIII! , II III II III II I oI I III
I III ,, �. � �� � �� �� � Illllllllmwullllmlllllllllluuul III II III II III II III III II III II III II III II III II III II III II III II III II III II II I III � �� III I IIII""""' �� ��� � � uuuuuuullllllllllllllIIl !!! IIIII111 11 111 11 I II II I I II I IIIIIII" "I��tlll II III II I Illuuuuuuuuumiiiiiuuuuu
Ill Huuu u IIl ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll l! ! lp9 II IIIIIIII II ! !I I II II I II II I I! !! ! !! !! ! II II I II II I II II I I II II I II II I II II I . . .I II III II III II I III II III II III II II I II III II L . II III II III I II III II III II III II III II III II III I ! III II III II III II III II III I II II III II III II III II III II III II III II III II II uuuu!11, II III II I I III II III II III II III II III II III II III II III uuuuuuuum°°iitllll ��.� uuIIIIIIIPjj°I""� °°°°°° II �� ��� �� ��� mII I II II I II II I II I
I II III II III II III I I II „I II I II uuI III II III II II II I II III II III II I,I IPJI II III II III II II I I II II I II II I II II I I I Illlll"' du u iu u lll II lll ll lll ll lll ll lll ll lll ll lll ll ll II I III II II II II I II IIIII III II III II III II II I II I II II lII I�III I„,' II
I '
I III II III II III II III II III II III II III II III II III II III I II II I I I Illllllllllllllll uuuuuuuuu III I ...., I II III II I IlllllllllllllllllllmuuuuuuuIIllllllllllllllluuuuuw 111 11 111 11 1
uuuuuuuuuuullllllllllll uuuuuuuuuuuuuulullp II I II II I II II I II II I II II I II II I II II I II II I II II I II II ...... IIIIIIIIIIII II III II III II III II II I II II I II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I I

I II I II II I II I I II II I I
m l """IIIIIII III II
p9uuuuuuulllllllllllll II1II111111IIllll
Iuuuuuuuul!!!!!!!!!!uuuuuuuuuuuw IIII 11 11 11 II oleJl II IaulIIplUmi!!! �idIIl hIIIIIII,Iuplllwuwuuu!!,,,,lllllluuulluuH1Ulllluul°°°°°°°! 1IIIIIIIIupIII �, I I III I II II II I II II I II I 1 11 11 1 11 1 I II I '; ul lll ll Illlllll lllu , I II II I II I Ilullllll „ Il lll l °1 I VII I
.,, IP ° Hlumluul Illlo9 ,auuU1;IIIIHU1 I II II I II II I II II I IIIIIIIUIIIII111IItl1Uuuu " II ! II II I II II I II II I II I
II III II III II III I I I III I I lml „IIIIIIIII. VIII IIllllllllIIIIIIIIIIIIIIIIIIII11II111lIIIIlpllllllllllluuuuIIl 1111 II III II ouuuuuuuuuuuuuullllllll
IIII uuu uuuullIIlllpulplllpp1p111!IIIIIIIIIIIII
IIIIHu!l11111Pugii!!! ii ii i mull du9l
I lll ll uu IIIIIIIIIIIIII! I III II III II III II III II 1 111 11 111 11 111 11 111 11 111 11 11! mu11 11 111 „ I II I lll ll ii i
II
Il l li ii l I II II I III i i il ll l l II��IIII III ! !! II ', mI .... I II uuuuu ! II III II II
g1 !I II I III II I
III
„,IIuu111111h L
II II I II II I II II I Il 11 1 1
II
' ,, ,, , ,, '! 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 I I I ul ..II !I II I I IIIIIII' I Iuuu9IIumudllll111I1111!!1I IIIU °II
,
Illlll
II III II II I II I ,.., II
uoup ll l l ll l lll ll lll ll lll ll lll ll lll l
j m 1 mama uuuu,
II uuuuuuuu!!!!!!!!!!!!!!!!!!!!!!!11111 """ ""P"""" iii1 Il III I II II i i ii ii i ii ii i ii ii i ii ii i ii ll l ll ll l ll ll l ii ii i VIII II Ilumu " 1 11 11 1 II I II II I VIII II II! ! Illll911p1p° IllHulwl uwll of II II II 11 '
II II I II II I II II I II II I II I I II I II II I II II I II II I II II I II II I II II I II G 111111IIII""';I'; -111Jiiiii1iuIIliii 1 111 11 111 1
11 11 11 1 11 11
.. I III II I uuuuuuumuulllu°°°!!!IIIIIII 1 !!! !! !!!
...,IIII ..II lllllu l u II III I uuu uuuumuuuuuu III utlH1 p ! III II III I II II III II .. II II allllllup""' !I III II II I II II I II II I II II I II I II II II I II II LI„ law Ii ' ' uuuuullII II U ,II II I II IIIIu ��III. !II II I ." � IIIIol uu ° III" ul w II
oll IIIIIIII atlllpl IIIU uuuu II II III II ! I II II I II I 111 11 11 1 11 111 11 111 11 111 11 11 " iiiiiiiuuuuuuuuuumuuuuuuulll uulpllulll m' !I II I II
I II .... 111111lluul IIIIIII tllllHll! ul II
Il lll l II III II II I 11 11 1 11 1 ' � ,, , ;uuuu II III II I p° IIu111111IIIH IIIIwmI ,,I'I'I! uu II I
ul Ilgl,µuuuuw uuu
..II I IIIIIII uu°i ! IIII wwu I II I l !! Hum
II u I I.

II
.. IIIIII'1111111111111 h II„,I I II ul I IIII II
.uuuuu!! I I ll I omuulllIIlllllll l w
I . uuumuuull .I III II I ., Illlum lll .. I II I I
114 to .. Iluuuuulllluluutl
II III I1 111 11 111 11 111 11 111 11 1u u uuu uu'
Ill ll l ! II II I III IIIi 1ii II III II III II III II III II II II II l II II III II l,11 11 111 II I
II . .�. II II III II II III II III II
hhhhhhhhhhhh
..0
I II I Ilu dl'i,ngI'
•
1 11 11 1 11 11 1 11 11 1 11 ! ul '� " " °�i il lll ll l l l III II III II III II I III II III II III U II II, I„duull'� I II I a "
...........,!IIII ul .I II ' IIII uuuumuuw l ...
.. ..III
IIIIm1lLLl °°
hlI
Ilamu II
"' "°°°°IIII" uW1IlII11IIIIll
i a�IItIiIo
Pa • e 500 of 642

IP' W nding Litigation
1E has not been involved in any substantiated complaints, litigation, Regal proceedings, or investigations by a regulatory authority in the last five years.

Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023

Page 501 of 642 ends

.,11011 lluwiill II II II ll ll l ll ll l l lll ll lll ll l 11 1 l l 1 1 11 1� � ,; "' ^^ r,,,,,, 111uu11111111n 11" 11111111 1 Illumuu111111u1

III II III II III II III II III II III II I
uuuu111111111p III II II uulii !!uum
1 11 1 11 11 ,
II I II II I II II I II II I Ii ii i ll II I II II I II 11 1 11 II II I II I II II III II II I ll l l l u ul l II II II I I I I III II III II III ll ll lll lh 11111111111.. muuuuuuuuuur""""
111111111111111111111111„„„111111,, H u m
11111111111111 '''''''',,,,,,,,,111111111111111111101111111111111111111mmulmm111111ll11,14111,"' „„,III1111111111111111111111111111111111111111111111111111111111111111111,„„„„„, umuuuuuuuuuuumuuuuuuuuu11111111111111giiii111111111 11111111111I"' uuuuuuuu111111111 I III II III 11111111°��liiiiiil uulluuuuuuuuuuul 11111 1111111111„1111111111111111111111euu11111111111,,,,,,111111111uuuuulllllllllllllllllll111111111111111111p11puuuuuuuuuuuuuuuouuuul, � � �� �� � �� � ��� �� ��� � .� � �� ��� �� �� oumll ...., 11 11 .11 11 1
1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 VIII 111111111ulllllllluuuuuuuuuuuulluuuuuuu111111111111 m 1111 11 1 11 111 11 11111 111 11 111 11 11 1 11 111 11 111 11 111 1 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 1 II III I I ppI II II II 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 11 1II II III II III II II I II III II III I 111 11 111 11 11
P1 11 111 11 111 11
11111111111111 II I
1 1 11 111 11 111 11 ,,
11 11 111
uuuuuuu
11 11 1 11 1
111 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 11 1 11 111 11 111 11 � ��� �� ��� � � �� ��� �� ��� �� ��� �� ��� �� ��� �� ��� �� ��� �� ��� �� � 11111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111.....��������������� 11111111111111 1 11 ......
11111111
uuuuuuuuuuuul
!!! !! !!! !! !!! !! !!! !! !!! !! L ............... III II III II I uu u uuuu ll lll ll lll ll ll l ll lll ll lll ll lll ll lll l

I II II I II III II I ,
Illlluuuugiiiiiipiiiiiiiipuuu II .... II III II III II III I III II III II III uuuuuuuuuuuuuuuuuuuuuuuuuuul II II I II II I II II I II II I I! !I I II II I II II I II I IIIIIIIII i iii ii iii ;! ;;; PI III II III II III II III II III II III II III II III II III ° °°° 1 11 11 11 1 11 111 11 111 1 II II I ���������������111111111111111111111111uuuuuuuuuuuuuuuuum 111111111 1 1111 I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I ... 1111111111111111111111111111111111111111111111111111111uuuuuuuuuun11111111111111111111111 „............. JI III II II II I II II I II II I II II I II II I II II I II I I I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II 1111111111111111111111111111uuulllllllllll P,III! uuuuuuuuliiiiiiiiiuuulllllllllllluuuuuuuuuuuuuuuuuuullllllllllluuuuuuuutl Qu1111111111111111111111111111i1111111111111 I II II I II II I II I 1 11 11 1 11 11 1 11 11 1 11 11 1 11 1� ,, ,,, ,, uuu11111uuuuuuu11111111111111 mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm mmmmmmmmmmmm mmmmmmmmmmmmmmmmmmmmmm 11111111°1luuuuuuuuumuuiiiiiiiii I ii i1 11 1
I II II I II III II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I 1 1 11 111 11 11 I III II III II III II III II III II II II Illlllllluul11muuuuu
111 111 11 111 11 111 11 111 11 111 11 11 onmi1111111111111111111 o II III II III
' 1 0uuu1�' �^ ,Jam uwuu II II III II III III I VIII a II I II II I ��11111muuuuuuuuuullll uuuuuuuuuuu11111111111uu1111111111111 1111111"'"' ' II
1 uuuullllllllllllllllllllllllplpl °IIII 11111111111111111uuuuuuuulll11111IIIIIIIIIIIIIIIIIIl1111 IIIIIIIIu111111l11 11 III I II II III II I Ills ..., 1; 111 .1louuuullllllp10l1Vllllllll 11111u11uuuuuuuuuuuuuuuuu11111111111111111111111111 111111111111111111111II1 I u llll !II II I

I III II III
I III II III II III II I I 111111111116 u Vl ll lll ll lll ll lll p l11 11 111 III II IIuull ll lll ll lll ll lll lp11 11 111 11 111 11 111 11 111 11 111 11 111 VIII .... 1111°°11111„„1111°u ., I III
I II I II III I I rlumuu um 1 ., I I II II I II III 11 11 111 11 111 11 1 1 I III II III II III I ... um
111,IIo11,11111111111ullluuuuulum uuuuuuu!!!!!I„IIIIIIII ....1111111111111111111uuuuuuuuuuluuuuu111111111IIII ..... .. 1 1 11 11 1 1 II II I II I II II I, II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II II I II 'i I II III II II 11 11 111199 1NII II III II III II III II III II III II III II III II I .... .. I II II III II .„ I III II III II I
III 1 � � �� �� ��� �� 11110uuuuuull1111uuuuuuuuuuuuuuuuuuulluuu1p111 1111111""" ' � °III Il l ll lll ll lll ll lll ll lll ll ll l ll lll ll lll ll lll ll lll ll lll ll lll m^ " 1 11 1 � 11 11 1 1 1 11 111 1/ .. ... 11 1 11 1 � �����g II III II III II III II 11 11 11m lll ll lll ll lll ll lll ll lll ll lll ll lll l " 1111111111111 I II II I II II I II II I II II I 1°III I II III II III II III II III II III II II ul miiilllllf���
II 1 11 1 11111;1111 ° 1 m
1 11
I l ll l ll ! !! l ll ll l 111111111111 111111111 all III uum !!a 11 11 11 11 1 11 11 1 11 11 1 11 11 1 11 11 1 11 1 11 11 VIII 11 111 11 111
duuuu11111111uuuuuuuuuuu 11 II II
�� � �� �� � �� �� � �� �� � � 111 11 111 III I I III II II III II III III II II III II ... ...........11111111111111,„. .11,11 I III II 110uuuuuulllllll1111111 III II II I II III II III II II uiuuuu11111111111111111 JIIII 11111
11 11 1 11 ,
111uu1111u1111uuu1l d III
H1 111 11 111 11 111 11 111 11 111 11 111 11 111 11 11' 11 111 11 el ll uul lll l 11 p 1, 1 1°° 11 111 11 111 11 111 11 11 1 111 11 11 111 111 11 III II IIl u 11 1 11 1u 11 11 11 11 111 11 111
""""' '•... 1 1 11 11 1 11 � ��� �� ��� ., 11euu a11u0mup111111iiullll ., 1 11 11 1 11 1 I II I II II I II II I II II I II II I II II I II II I II ° 1 " "" ,,, ,1 111 11 111 11 111 11 111 11 II
d
...., uuuuuuuu 1 1111111111°°° ,, ,; , :1 111 11 11 „,1111111111' u u .' uuuuuu;iil � 11 111 11 111 11 111 11 111 11 11 1 11 111 11 111 11 111 1u11 11 1� � . lu " 11 uuuuuuuuuuuuuuul „
1111 a II I VIII ,ffilimmillimmulllllllllll
111 VIII """="'"'"T
VIII 1 11
..Ialllllllll III II III II II 1m 11111;;11° 11II II III II Iu ' 11111111111111111111' 11111 pl
11 .:1 uulr" tlI II IIl I1 111

II III II I
u u uu1 111 11 11 1 11 111 11 111 11 111 11 111 11 1 ,
I '..11 ..,1 11 111 11 111 11 111 1
uuuuuulllllllll uuuuuuuuuuuuuu1111111111111

I III II III II III II I I III II III II III II III II III II III II III II III 11 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 11 111 . ""'"11111111,111111,
,1 11 111 11 111 11 111 11 111 11 111 '
.n1 111 11 11 1 11 111 11 , , "
—11 11 111 11 111 1
nsura1 ce
Ill lk
Pa • e 502 of 642

Insu ce
AC Lf
•

CERTIFICATE OF LIABILITY INSURANCE
CATE IMMJDDIYYYY}
07/06/2023
THIS CERTIFICATE IS ISSUED ASA MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: IF the certfcate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or. be endorsed. tf SUBROGATION IS WAIVED, subject to the terns and conditions tithe po Icy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in Iles of such endoreemant(s).

PRODUCER
Klein Agency, LLC
P.O. Box 219
Timonium MD 21094

CONTACT
NAME
PHONE (410}832-7600 FAX {410!832.1849
NG�, No, EiM1I: LMC NCI]:

Cents kleina n Ic.Com
A•DDRESS: ®
1NSURER(S}AFFORDING COVERAGE
NAACO
INBURERA: Charter Oak Fire Insurance Co
25015

INSURED
Infrastructure Engineers, a Bowman Company
3060 Saturn Street
Suite 250
Brea CA 92821
NSURERB; Travelers Property Casually Co. of America
25874
muRER C ; Barkley Insurance Company
INSURER D :

INSURER E
INSURER F:

COVERAO
CERTIFICATE NUMBER: 2-Z3 Irrfaalucture Engi
REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES DF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE ENSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDINGANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCEAFFORDED BY THE FOLIC ES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONSAND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

INER
LTR

TYPE OF INSURANCE
AUUL
iNSrl
SU R
WVD

POLICY NUMBER

POUCYEFF
(MMm0FYWY)

POUCYEXP

IMMNDNYYYYI
MRS
A

COMMERCIAL GENERAL LIABILITY
8308.1047845
OW31/2022
08/3112023

EACH OCCURRENCE
$ 1'000,000
CI.AiMS-PACIF: FRI r7CCu"+
I.MNI5CE TO REhlT17
PREMISES/ Ea mammon)
000.000, 1
1,,,,,,_....
tIED ExP (Any one (mewl
$ 10,000
Contractual Liability

PERSONAL&AOV INJURY
$ 1,000,000

GEN'LAGGREGATE
_
LIMIT APPLIES PErt
POLICY ® JP,OT LOG
OTHER:

GENERAL AGGREGATE
$ 2,000,000

PRODUCTS-COMPJOPAGG
S 2,OOO,D00
$
B

AUTOMOBILE

LIABILITY

ANY AUTO
OWNED

AUTOS ONLY
HIRED

SCHEDULED
AUTOS

NON -OWNED

AUTOS ONLY
8108T020400
03/31/2022
08/3112023
CCMElINEb s:hGLE LIMIT
(Ea acc)L 1,rI ,
$ 1,000,000
BOIXw INJURY (Per pereon)
$
Elmo, (NARY (Par acddanD
$
P.RC EP1Y VA.MA,E
IPer aerad0r,V
$
B

UMBRELLA LOB

EXCESSUAB
OCCUR

CLAIMS -MADE
CUP8J395074
08131/2022
0813112023

EACH OCCURRENCE
$ 25,000,000

AGGREGATE
a 25,000,000
DEC RETENTION $
3 B

WORKERS COMPENSATION (

EMPLOY S' UABLITY
ER

ANY PROPRIETORJPARTNEREXECL,TIVE
OFF10ERJMEMBER EXCLUDED?
1Mandtory In NH}
Ityee, de crreunder
DESCRIPTION OF OPERATIONS below
YIN
©
NI
L1B9.1317115
a
0813112022
08/3112023
FER 3"1"7AND
e" -et ,5'1'Rill'fE ER
E.L EACH ACCIDENT
$ 1,000,000
E.L DISEASE- EABIPLOYEE
a 1,600,0(30
E.L DISEASE- POLICY LIMIT
$ 1,OOO,E100
C
Primary Professional & ollu i on iabib 1
Excess Professional It Pollution LlahEltty
AEC905795802N3349C220101
OW31/2022
08/3112023
Each Claim/Aggregate
Excess Each ClaIm!Aggr.

Total LImlta;
5,000,000
5,000,000
10,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS/ VEHICLES ACORD Sao, Additional RaneAra Schedule, may be alhtW a moan apnea la required) If required by an insured written contract, executed F ar to sow loss, the certificate holder Is anAdditlonal Insured on a primary and non -Contributory basis under the General and Auto Liability Policies. If required by an insured wittier' contract, executed prior to any Foes, Waiver of Subrogation is provided for General, Auto, and Workers Compensation Policies. Umbrella Policy follows farm over General, Auto, and Employer's Liability Policies. 30 day notice of cancellation, 10 day for non-payment

CERTIFICATE HOLDER

CANCELLATION
•Evidence of Coverage"

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

AUTHORIZED REPRESENTATIVE
ACORD 25 (201e$03)
w 1988-2015 ACORD CORPORATION. AU rights referred,
The ACORD name and logo are registered marks of ACORD
IIFi1r structuri:~ Engineers, a Bowman company Municipal Engineering Services I November 9..20123 -4 I'Ds2

Page 503 of 642 ends