Vetere ns Park estroo Renovation
Veterans Park Restroom Renovation
Internal Budget Worksheet
2.01 Preliminary Layout Plan & Client Confirmation Meeting Principal In
Charge
*Time focused
on Park Fee
Task 2: Design Development Services
2 4
12 2.02
Draft Schematic Plan
16 60
2.03 Final Schematic Plan
4 8
40 2.04
50% Design Development
24 32
80 2.05
100% Design Development
16 24
60 8
Task 3: Construction Document Services
3.02 65% Draft Construction Documents
21 70
106
9 3.03
90% Draft Construction Documents
13 42
64 11
3.04 100% Draft Construction Documents
28 42
3.05 Permit Processing Assistance
3.06 Bid -Ready Construction Documents
4 14
21 4
Task 4: Construction Support Services
4.01 Bidding Support
4.02 Construction Administration Support
4.03 Construction Observation
4.04 Record Drawings
Project Coordination & Management
Project Development Team Meetings (assume 8 virtual @ 1 hour ea) QA/QC Review
Task 0, OPtionall $
6.01 Public Hearings (assume 3 @ 4 hours each)
4 12
24 4
4 16
80 8
16 8
32 6
4 8
40 2
16 32
8 16
4 32
50 City of Bell Gardens Page 559 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Engineer II
12 24
60 $ per hour
Structural
Engineering
Utility Mapping
lump sum per task
Geotechnical
Engineering
lump sum per task
MEP
Engineering
lump sum per task
Gost
Estimation
lump sum per task
42 25
17 10
34 6
20 14
16 8'
Methodology
16 12
Section 1
7 32
4
10 16
erns P
VETERANS PARK RESTROOM IMPROVEMENTS SCHEDULE
NoticA to Proceed Issusd
Project Setup w/AccounUng Subconsultants, Si PM
Coordinate tAdity MapP4,6,44 fity Coormnation
Conduct eeo.chnical
Prepare Geotechnical Report
osign Development
Prepare Prelimfnary Layout Plan
Conduct Client Confirmation Meeting
Prepare Draft Schema. Plan
NOLIDAV BREAK
Prepare Draft Sohersat Plan CAst
City ReMew of Draft Schematic Plan
Prepare Final Schematic Plan
20 Prepare Final Schematrc Plan Cost Estimate
City Review of Final Schema. Plan
Prepare 50, Design Developme. Package
Prepare 50% Design Development Cost Estimate
Prepare 100% Design Development Package
26 Prepare 100% DesIgn Development Cost Enrnale
City Remew of 100% Design Development Package
24 es
Durabon start Finish
047 days mon 10/13/25 Too 4M/28
5s days Mon 10/13/25 Fn 12J26/25
0 flays Mon 10/13/25 Mon 10/13/25
9 days Tue 10/14/25 An 10/24/25
15 days Mon 10/27/25 Fri 11/14/25
days Mon 10/27/25 Fri 11/14/25
2 flays Mon 11/17/25 TA,. 11/18/25
28 days Wed 11/19/25 Fri 12/26/25
175 days Dion 11/17/25 Fri 7/17/26
10 days Mon 11/17/25 Fri 11/28/25
10 days Mon 12/8/25 Fri 12/1.25
10 days Mo, 12/22/25 Fri 1/2/26
10 days Mon 1/5/26 Fn 1/16/26
10 days Mon 1/19/26 6,1/30/26
0 Jays Mon 2/9/26 Mon 2/.26
9 days lue 2/10/26 Fr, 2120/26
10 days Mon 2/23/26 Fri 3/6/26
10 days Mon 3/9/26 3/20/26
20 days Mon 3/23/26 An 4/17/26
10 days Mon 4/20/26 Fri 5/1/26
15 days Mon 5/4/26 Flt 5/22/26
20 days Mon 5/25/26 Fn 6/19/26
10 days Mon 6/22/26 F6 7/3/26
10 days Mon 7/6/26 Pn 7/17/26
25 29 Construction Documents Mon 7720/26 Fri 4/16/27
30 Pnspar4 65% ConsfruotIon Documents & Specifications 35 days Mon 7/20/26 Fri 9/4/26 Prepare.% Construcbon Documents Cost Estimate 10 days Mon 6/7/26 FS 4/16/26 City ReMew of 60% Construction Documents, Specs 8. Cost Estimate 20 days Mon 9/21/26 Fri 10/16/26 Prepare AO% ConstrustLonDosuments& Specs 30 days Mon 10/1.26 Fn 11/27/26 Prepare 90,6 Construction Documents Cost Estimate 10 days Mon 11/30/26 Fri 12/11/26 City ReMew of 90% Construction Documents, Specs & Cost Estimate 5 days Mon 12/14/26 Fri 12/18/26 HOLIDAY BREAK 10 .y, Mon 12/21/26 Fri 1/1/27
City Remew of 90% Construction Documents, Specs 8. Cost Estimate 10 days Mon 1/4/27 Pri 1/15/27 38 Prepare 100% Construction Documents 8 Specs 25 days Mon 1/18/27 F, 211.27 Conduct DAQC on.1oO% Construction Documents 5days Mon 2122/27 Fri 2/26/27 Prepare 100% Consttuction Documents Cost Estimate 10 days Mon 2/22/27 Ffi 3/5/27 City Remew of 100% Constructfon Documents, Specs Cost Estimate 15 days Mon 3/8/27 P4 3/26/27 Prepare Bid Ready Construction Documents 15 days Mon 3/29/27 Fri 4/16/27 Submit 841 Ready ConsIntotron Documents to CIty 0 Jays Fri 4/16/27 Fri 4/16/27 36 40
Construction Phase
Bid and Award
47 City Council Bid Award
48 Not. to Proceed Issued
49 Constructron
50 e'er P
reject Coordination Services
Project Coordination & Management
estroom Ras.,
Design Team Actmty
252days Mon 4/10/27 Tue 4,4128
70 days Mon 4/19127 Fn 7/23127
9 days Mon 7/26/27 Mon 7/26/27
180 days Wed 7/28/27 1,4/4/28
636 days Mon 10/13/25 Mon 3/20/28
636 days Mon 10/13/25 Mon 3/20/28
novation
2227, 6111 621261 Stm@212 5
•
10/13 4Notice to Proceed Issued
10/2
g102536 29
ejectSetup n y, soconsultants,
°ordinateUtility pP a ..4 Coordination
°ordinate Geotechnical DOH. A. Schedule
conduct GeotechMcal Drilling
,28 Prepare Preliminary Layout
tt 12/2% Conduct Client Confirmationm.o.,
Prepare Waft schemahc Plan
t/21iimHOLIDAY BREAK
16 pare Draft Schematic
City Revieww or Bran ScM1 matiEstimate
219' City to Conduct City Council Presentation. Draft Schematic Plan Plan Cost Esti
3,2012HE City Review of Final Schematic Plan
are 50% Design Development Package
repare 50% Design DevelopmeM Cost Estimate
Review of 50% Design Development Pack,
100% Design Developmc
Prepare 100% Design Dev
If ow 0100'
Agency IAI Construction Milestone
52 city of Bell Gardens Page 561 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
z8'ne 22v27'7' s,,,e{t2@ ,e1131S7,g'220'25;01714 212 .102540 mz5ao<43 e9nN142 ammssz328 2 2br;g x2 zn, e,.19p sns21x9 ,5292510e 9taz950 m25a 94si mt Package
glopment Cost Estimate
05% Construction Documents Si specifications
9/ repare 6S, Construction Documents Cost Estimate
10I1 Ci Ro.iew or su%Conovoction Documents. Specs & Cost Estimate Prepare 90% Construction Documents & Specs
2I repel, 00% ConstrUCtion Documents Cost Estimate
tee. City Review of 00, construction Documents, specs s cost estimate Ina HOLIDAY BREAK
epare 100, Construction Documents & Specs
Conduct °AOC on 100% Construction Documents
P re 100% Construction Documents Cost Estimate
26 ew of 100% Construction Documents, Specs & Cost Estimate 4/16 w submit Did Ready Construction Documents to City
id dA ad
7/26 o city council Did Award
.7/2.7 ;Notice to Proceed Issued
Construction
Methodology
Section 1
Section Two:
Manage
ent and Staffing
Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
RRM Project Pictured:
Alex Fiore Teen Center and Goebel Adult Center,
Thousand Oaks, CA
Assembling Our Team
Hiring our company means investing in unparalleled expertise, exceptional service, and innovative solutions tailored to your specific needs. We bring a wealth of experience and a proven track record of success, ensuring that your projects are executed with precision and efficiency. Our dedicated team of professionals is committed to delivering outstanding results, leveraging the latest technologies and best practices to drive your business forward. We pride ourselves on our customer -centric approach, building strong relationships and understanding your unique challenges to provide customized solutions that exceed expectations. By choosing us, you gain a reliable partner dedicated to your growth and success.
City of BeII Gardens
RRM Design Group
Noah Waters,
Civil Engineer
Project Manager
Project Manager
Subconsultants
BELOW
C -Below Surface
Imaging an RMA
Company
Hector Vargas
Rechael GL raychn, NI A
Project Manager
Senior Landscape Architect
dscape Architecture & Grant Adminis
Jeff Ferber, ASIA L
Principal -in -Charge
Managing Partner
Steve Webster
Surveyor
Supervisor of Surveying
P2S Inc.
Gary Jewell
Nate Behning
Lars Henderson
Eric Gomez
Ellie Motevalian
scope Architecture & Architectu
NC
Gordan Maszk
Civil Engineer
Engineer H
Littoral Engineering
Pam Plcch Ai.
Planner
Principal Planner
vey & Planning.
Amanda Seibe@,
Design Director/Public Art Specialist &
Grant Administrator
Design Director & Landscape Architect
Tad Lupton
Architect
Manager of Architecture
GPI - Geotechnical
Professionals Inc.
Paul Schade
Michael Doremus, S
Structural Engineer
Manager of Structural
Engineering Services
OC)NU, In,
OCMI Inc.
Conor Clarke
Gary Mao
56 City of Bell Gardens Page 565 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
rrm
dn
SML g
t .. groesiup
Creating
Environments
People
Enjoy.
Senior Landscape
Architect with 13 years
of experience
Education
• Bachelor of Landscape
Architecture, Minor in
Sustainable Environments,
California Polytechnic State
University, San Luis Obispo, CA
Licenses and more
• Professional Landscape
Architect, CA 6227
• American Society of Landscape
Architects (ASLA), Student
Chapter Member 2008-2013
• American Society of Landscape
Architects (ASLA) Member 2013-
2021
• Chapter Secretary of Southern
California Chapter (SCASLA)
2017-2018
Management and Staffing l Section 2
achaeI Gura►ydln ASLA, PLA
Project Role: Project Manager
As a landscape architect, Rachael prioritizes understanding the unique characteristics of each community to deliver an end product that genuinely reflects community desires. She has applied this understanding in a wide variety of public projects, including parks, trails, streetscape and waterfront design. As a southern California native, Rachael is passionate about her local environment and understands the need for water conservation, She embraces the design challenges that corne with the changing environment, and is committed to sustainability.
;rt:rUk r;,bU f,rz fitnrt
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park, Wildomar
• Central Park Master Plan Update,
San Mateo
• Cheeseboro Canyon Trailhead,
Agoura Hills
• City Heritage Park, Parlier
• Guymon Street Pocket Park Site
Development Permit, San Diego
• Harbor View Park, Ventura Harbor
• La Mirada Creek Park Master Plan
• La Palma Green Promenade and
Paseo
• Las Positas Multi -Use Pathway
Santa Barbara
• Lindero Linear Park,
Westlake Village
• Morro Creek Multi -Use Trail and
Bridge, Morro Bay
• Neff Park Improvements, La
Mirada
• Olympus Park Design, Encinitas
• Otay River Trail Design and
Restoration, San Diego County
• Port of Long Beach (POLB) Trail
Planning, Long Beach
• Porterfield Creek Trails Open
Space Preserve, Cloverdale
• Potrero Canyon Park, Los Angeles
• Rancho Alegre Master Plan and
Reconstruction, Santa Barbara
• Randolph Street Rails--to-Trails
Feasibility Study, Huntington Park
• Redlands Parks Facility' Condition
Assessment
• San Lorenzo Corrmrnunity Park
• San Sevaine Trail Connection,
Fontana
• Santa Barbara Island Park & West
Side Monument (aka Channel
Islands), Oxnard
• Santa Cruz Rail Trail Arts Master
Plan, Santa Cruz
• Santa Cruz Rail Trail Segrnent 7
and Segment 8, Santa Cruz
• Scotts Valley Park and Playground
Replacement, Encinitas
• Weekes Park Master Plan,
Hayward
• Whittier Greenway Trail East
Creating
Environments
People
Enjoy.
Design Director,
Landscape Architect
& Professional Mosaic
Artist with 20 years of
experience
Education
• Bachelor of Landscape
Architecture, Visual Expression,
California Polytechnic State
University, San Luis Obispo, CA
• San Diego Mosaic School, San
Diego, CA — Studied advanced
mosaic methods with a focus
on blending fine art into public
spaces.
Licenses and more
• Professional Landscape
Architect, CA, 6504
• LEED AP, CA
• Leadership in Energy and
Environmental Design
Accredited Professional (LEED
AP)
• Surfrider Foundation, Member,
2013 -present
Amanda Seibel
LA, L..EE AP
Project Role: Design Director/Public Art Specialist &
Grant Administrator
For 20 years, Amanda has been transforming outdoor spaces into masterful works of design and art. With a rare blend of technical expertise and artistic vision, she offers a unique lens to landscape architecture. As an accomplished mosaic artist with public art installations across united states, Amanda brings a creative depth that allows her to seamlessly integrate art into public park and community spaces.Her ability to refine concepts into detailed, built projects serves as an asset to clients, colleagues, and communities alike. True artistry and compassion guide her design process, from the spark of an idea through to implementation. Specializing in parks and recreational design, Amanda's talent lies in vveaving artful experiences with landscape architecture to create spaces that are not only functional, but also deeply meaningful and beautiful. By honoring the creative vision of her clients and collaborating with her design teams, Amanda is committed to enhancing natural and civic spaces for the benefit of all. ;: ;:;t rience
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park,
Wildomar
• Bradley Park Renovation, San
Marcos
• City Heritage Park, Parlier
• Downey Measure S Park •
Improvement Projects --
Discovery Park and Furman Park
• Escondido Creek Trail
• Greenwood Park Renovation,
Hayward
• Greystone Neighborhood Park, •
Bakersfield
• Huntington Beach Park Master
Plan •
• Johnny Cash Art Trail Master
Plan, Folsom
• Kennedy Park Master Plan,
Hayward
• La Mirada Creek Park Master
Plan
• La Palma Park Expansion and •
Renovation, Anaheim
• Lindero Linear Park, Westlake
Village
•
•
Olympus Park Design, Encinitas
Ortega Park Preliminary Design,
Santa Barbara
Porterville Fourth Street
Community Center and Park
Design Services
Potrero Canyon Linear Park,
Pacific Palisades
Rancho Potrero Group Picnic
Area, Thousand Oaks
Redlands Parks Facility
Condition Assessment
Salinas Public Art Master Plan
San Lorenzo Community Park
Master Plan
Santa Cruz Rail Trail Public Art
Master Plan
Scott Valley Park Playground
Replacement, Encinitas
Sweetwater Regional Park
Improvements,
San Diego County
Venice Beach Skate Park
Zumwalt Park Conceptual
Design, Tulare
58 City of Bell Gardens I Page 567 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
rrm
design
group
Creating
Environments
People
Enjoy®
Managing Partner with
40 years of experience
Education
• Bachelor of Science, Landscape
Architecture, California
Polytechnic State University,
San Luis Obispo, CA
Licenses and more
• Professional Landscape
Architect, CA, 2844
• American Society of Landscape
Architects (ASLA), member,
1990 -present
• Central Coast Salmon
Enhancement, 2000-2006
• Arroyo Grande Watershed
Forum Steering Committee,
2000-2006
• California Parks and Recreation
Society (CPRS), member,
2000 -present
• National Recreation and Park
Association, member,
• Cal Poly Landscape
Architecture Department
Advisory Committee, member,
2009 -present
Management and Staffing l Section 2
Jeff Ferber ASLA, PLA
Project Role: Principal -in -Charge
keen ability to translate public needs into a relatable design is reflected in each of his projects. As a managing partner of the firm, he offers a team - style approach to leadership and design. With experience in the public and private sectors, focusing on park and planning design, Jeff strives to transmute the collective vision into reality. Valuing effective communication and mutual respect, he is committed to fulfilling the needs of both the client and the community through precise project execution. roject k
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park,
Wildomar
• Bakersfield Sports Village
• Barney Schwartz Park, Paso
Robles
• Columbus Park Soccer Facility
Design, San Jose
• Dublin Sports Grounds Master
Plan
• Dwight Murphy Park
• El Corazon Community Park
Master Plan, Oceanside
• Estero Park, Isla Vista
• Greenwood Park Renovation,
Hayward
• Ken Mercer Sports Park Skate
Park, Pleasanton
• Kennedy Park Master Plan,
Hayward
• Lindero Linear Park, Westlake
Village
• Meek Estate Park West Terrace,
Hayward
• Mia`.s Dream Come True
Playground, Hayward
• Olympus Park Design, Encinitas
• Ortega Park
• Pleasanton All -Abilities
Playground
• Rancho Potrero Group Picnic
Area, Thousand Oaks
• Redwood City Downtown Library
Park
• Righet:t.i Ranch Parks, San Luis
Obispo
• San Lorenzo Community Park
Master Plan
• San Luis Obispo Babe Ruth
Baseball Complex Master Plan
• Santa Barbara Island Park
West Side Monument, Oxnard
• Santa Rosa Park Restrooms
Renovations, San Luis Obispo
• Sapwi Trails Community Park,
Thousand Oaks
• Sinsheimer Park Playground, San
Luis Obispo
• Tennyson Park Master Plan,
Hayward
• Venice Beach Oceanfront Walk
Bike Path and Skate Park
• Ventura Community Sports Park
• Veterans Park, Brentwood
• Via Toledo Neighborhood Park
Master Plan, Hayward
• Weel<es Park Master Plan,
Hayward
• Whittier Greenway Trail
• William Payne Park Master Plan,
Livermore
rrm
dsign
geo p
Creating
Environments
People
Enjoy
60 Manager of Architecture
with 34 years of
experience
Education
• Bachelor of Architecture,
College of Design, Architecture,
Art & Planning, Cincinnati, IN
Licenses and more
• Architect, CA C39678
Tad L: pt e I;.m, AIA, LEER A
Project Role: Project Architect
As Manager of Architecture, Tad brings unique expertise to the firm's architecture department. From managing and operating his own architecture firm to working as a Walt Disney World Imagineer, his experience is far ranging. In addition to his diverse professional background Tad's specific project types vary as well. From residential and mixed -use projects to community -enhancement and custom horror development, he offers a unique technical skillset. Above all fad is driven to fulfill ea h client's unique needs through creative and sustainable solutions,
• 27 Acre Park, 1. Acre Park,
Regency Heritage Park,
• Z.7 Acre Temporary City Hall
Siting Analysis, Wildornar
• Anaheim Architectural
Development Visioning
Packages for Two Sites
• College Avenue Public Library,
Indianapolis, IN"
• Grand Milleniurn Center,
Westfield, IN'
• Indianapolis Airport: Authority's
New Midfield Terminal,
Indianapolis, IN'
• Mendota City Hall and
Police Station Construction
Documents
• Mendota City Hall and
Policy Station Construction
Documents
• Menlo Park Fire Protection
District Space Needs
Assessment
• Mountain House New Fire
• National Underground Railroad
Freedom Center, Cincinnati,
OH*
• Neff Park Improvements, La
Mirada
• Newport Beach Perrnit Ready
ADU Plan and Public Outreach
Improvement Services
• Porterville Fourth Street
Community Center and Park
Design
• Riverstone Fire Station Nu, 58,
Madera
San Diego County Strategic
Fire Facility Plan
• Zumwalt Park Conceptual
Design and Renovation Final
Design, Tulare
City of Bell Gardens Page 569 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Creating
Environments
People
Enjoy®
rrm
design
group
Project Manager with 14
years of experience
Education
• Bachelor of Science, Civil
Engineering, California State
University, Northridge, CA
Licenses and more
• Professional Engineer, CA,
90156
• American Institute of Steel
Construction (AISC)
• American Society of Civil
Engineers (ASCE)
Management and Staffing l Section 2
Noah alters P
Project Role: Civil Engineer Project Manager
As both a lifelong artist and second -generation engineer, Noah has a n
manager. Noah loves fining creative solutions for projects, and has a particular affinity for stormwater and grading solutions. He has dune work for a variety of different agencies throughout California while calling Irvine home. Noah is an active member of RRM's Professional Practice and Technology committee, the AutoCAD community, and RRM's Technical Systems User Group.
Featured pra,)i
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park,
Wildomar
• Bandini Canyon Trail
Construction Documents,
San Pedro
• Chumash Park Master Plan, Simi
Valley
• Fairmont Terrace Park
Construction Documents,
Hayward
• Foothill Boulevard Master
Plan for Public Improvements,
Claremont
• Harbor Terrace Substantial
Conformance Package,
Avila Beach
• Kennedy Park Construction
Documents, Hayward
• Lindero Linear Park
Construction Documents,
Westlake Village
• Mia`s Dream Come True
Playground, Hayward
• Morro Bay Harborwalk
• Neff Park Improvements, La
Mirada
• San Lorenzo Park Community
Park Construction Documents
• Santa Aria River Bike Trail,
Riverside
• Santa Rosa Skate Park,
San Luis Obispo
• Sinsheimer Park Playground,
San Luis Obispo
• Sweetwater Surnmit
Carnpground, Bonita
• Tennyson Park Construction
Documents, Hayward
• Whittier Greenway Trail East
rrm
dsign
Sec up.
Creating
Environments
People
Enjoy
67 Engineer II with 6 years
of experience
Education
• Bachelor of Science,
Environmental Engineering,
Son Diego State University, San
Diego, CA
• Associate Degree, Surveying
and Forest Practices, Kings River
Community College, Reedley, CA
Licenses and more
• Engineer In Training, CA, 171918
Gordian aszk
Project Role: Civil Engineer
With 6 years of professional experience in the workforce, Cordlan has a background of both public and private industry and a passion for recreational projects. Over the years, he has developed skills for recreratfttrlai and re.
;it, -t grticting,
i ( ': ... F 4 i t,,. d (ont.r P
t .i.. .v` ate'• ra.; `V'
rn-c6iirted
I
• La Palma Promenade, Anaheim
• New Love Park, Santa Maria
• 27 Acre Park, Wildomar
• Creek Park, La Mirada
• Neff Park, La Mirada
• Scott Valley Park, Encinitas
• Tennyson Park, Hayward
• Historic Ranch, San Jose
• Harbor View Park, Ventura
• Mt. Madonna Campgrounds,
anta Clara County
• Escondido Creek Trail,
Escondido
• Rail Trail Segments 8-12, Santa
Cruz
• Whittier. Greenway Trail,
Whittier
City of Bell Gardens Page 571 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
rrm
design
group
Creating
Environments
People
Enjoy®
Manager of Structural
Engineering Services
with 21 years of
experience
Education
• Bachelor of Science,
Architectural Engineering,
California Polytechnic State
University, San Luis Obispo, CA
Licenses and more
• Structural Engineer, CA, S5685
• Professional Engineer, CA,
72309
• Leadership in Energy and
Environmental Design
Accredited Professional (LEED
AP)
Management and Staffing l Section 2
chae I'oremus
SE, PE, LEED AP
Project Role: Structural Engineer
With over a decade of civil and structural engineering experience, Michael's approach to design is steeped in a commitment to detailed precision. Michael offers his extensive expertise for each client, specializing in housing, civil, educational, and recreational design. He has been involved in projects of all sizes, from large-scale steel frame hospitals to 43,000 sq. ft. laboratories to custom playgrounds and park restrooms, Also overseeing the design and code compliance for lateral and gravity systems, Michael is well -versed in a range of project types.
His thorough approach to design and a keen eye for detail translates into procedural and structural integrity.
project a
• Alex Fiore Teen Center and
Goebel Adult Center Master
Plan, Thousand Oaks
• Cheng Park Revitalization, San
Luis Obispo
• Downey Measure S Park
Improvement Projects -
Discovery Park, Furman Park,
and Independence Park
• Dublin Sports Grounds Master
Plan, Dublin
• Dwight Murphy Field Final
Design, Santa Barbara
• Grove Park Field and
Playground Renovations,
Berkeley
• Grove Park Field and
Playground Renovations Design
Services, Berkeley
• Kennedy Park Master Plan
Hayward
• La Mirada Creek Park Master
Plan
• Livermore Downtown Core
Landscape Concept and
Stockmen's Park
• Mia's Dream Come True
Playground, Hayward
• Olympus Park Design, Encinitas
• Paso Robles Joint Unified
School District Athletic Fields
• Porterfield Creek Trails Open
Space Preserve, Cloverdale
• Porterville Fourth Street
Community Center and Park
Design Services
• Rancho Alegre Master Plan and
Reconstruction, Santa Barbara
• Righetti Ranch Parks, San Luis
Obispo
• Sapwi Trails Community Park,
Thousand Oaks
• Sinsheimer Park Playground,
San Luis Obispo
• Stafford Lake Park, County of
Marin, Novato
• Tennyson Park Master Plan,
Hayward
rrm
design
group
Creating
Environments
People
Enjoy®
64 Supervisor of Surveying
with 41 years of
experience
Education
• Bachelor of Science,
Agricultural Engineering,
California Polytechnic
University, San Luis Obispo, CA
Licenses and more
• Professional Land Surveyor, CA,
LS7561
Steve `b'°j ebster LS
Project Role: Surveyor
Steve has over 35 years of surveying experience, both in the office and in the field. As a project manager his primary responsibility is the management of construction projects. While at RRM Design Group he has performed surveying .services such as construction staking, boundary and topographic surveying, for both public and private sector clients. Along with field surveying duties, Steve prepares construction stake calculations, conducts research and analysis of boundaries, and creates boundary, topographic, and ALFA maps. He has experience with surveying equipment such as total and robotic stations and CPS, Featured pq"a,i ct exp r r ;
• 27 Acre Park, TT Acre Park,
Regency Heritage Park,
Wildomar
• Biddle Park Master Plan, Arroyo
Grande
• Bradley Park Renovation, San
Marcos
• Central Park Master Plan
Update, San Mateo
• Cheng Park Revitalization, San
Luis Obispo
• City Heritage Park, Parlier
• Coastal Trail Survey - Riveria,
San Clemente
• Columbus Park Soccer Facility
Design, San Jose
• Conejo Creek Park Bike Path,
Thousand Oaks
• Dwight Murphy Field Final
Design, Santa Barbara
• Kennedy Park Master Plan,
Hayward
• La Mirada Creek Park Master
Plan
• Lindero Linear Park, Westlake
Village
• Meadow Park. Playground
Renovation, San Luis Obispo
• Morro Bay Skate Park
• Paige Lane Neighborhood Park,
Thousand Oaks
• Ramona Garden Park Master
Plan (CIP), Grover Beach
• Rancho Grande Park, Arroyo
Grande
• Rancho Potrero Group Picnic
Area, Thousand C)aks
• Righetti Ranch Parks, San Luis
Obispo
• San Lorenzo Community Park
Master Plan
• Santa Barbara Island Park &.
West Side Monument (aka
Channel Islands), Oxnard
• Santa Rosa Park Playground
Replacement and Restroom
Renovations, San Luis Obispo
• Sapwi Trails Community Park,
Thousand Oaks
• Vagabond Skate Park, Fresno
• Venice Beach Oceanfront Walk
and Bike Path
• War Memorial Stadium Paso
Robles Construction Staking,
Paso Robles
,-<iy u; DC, �� utr, Page 573 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Creating
Environments
People
Enjoy
Principal Planner with 40
years of experience
Education
• Bachelor of Arts, Geography
& Environmental Planning,
University of California Davis
• Graduate Studies, City &
Regional Planning, California
Polytechnic State University,
San Luis Obispo, CA
Licenses and more
• American institute of Certified
Planners (AICP)
• American Planning Association
(APA)
• SLO Chamber of Commerce
Leadership Program Graduate
Management and Stuffing Section 2
Pam ' cci AICP
Project Role: Planner
Having worked for the City of San Luis Obispo's Community Development Department for 30 years, Pam brings an invaluable perspective from the other side of the counter to RRM's Planning Group. While with the City, Pam processed several large development applications, including; the downtown Court Street and Chinatown developments, D' idio Ranch, Mindbody, SESLOC, and French Hospital expansions. While at: RRM, Pam has also worked on projects for governmental entities such as the Creek and Watershed Management Plan for the City of Goleta; a subdivision ordinance update for the City of long Beach; as Focused General Plan Update for the City of Dinuba; and affordable housing ordinance updates for various cities. Throughout: the process, Pam emphasizes establishing a friendly relationship with her clients to create an environment c.onduc'ive to success.
• Neff Park Improvements, La
Mirada - CEQA Exemption
• Pittsburg City Pak Categorical
Exemption
• Vallejo Franklin Park
Categorical Exemption
• Dinuba Focused General Plan
Update
• Arcadia New Objective Design
and Development Standards
• Carlsbad Objective Design
Standard`
• Goleta Watershed
Management Han
• Long Beach Subdivision
Ordinance
• Lucia; Mar School District
Projects Categorical
Exemptions
• Morro Bay Housing Element
Implementation Programs (SB2
nand REAP Planning Grant)
• Patterson Downtown Master
Plan - Addendum to the
General Plan LIR
• Vista Zoning Code
Amendments
• Ventura County In tial .S
Assessment Guidelines
y
RRM Project Pictured: Downey Measure S Park Improvement Projects Independence Park Futsal and Tennis Multi use Sports Courts, Downey, CA
Subconsulta
t Resumes
66 city of Bell Gardens Page 575 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
BELO
SUHSUR ACE IMAGING
An RMACnmpony
Vice President of
Project Management
with 15 years of
experience
Education
• TBD
Licenses and more
• TBD
Management and Stuffing Section 2
Hector Vargas
Project Role: Underground Utility Locator
With over 15 years of experience in the construction industry, including 8 years dedicated to utility locating, Hector Vargas brings exceptional leadership to C Below Inc. His diverse roles as a sales representative, project manager, and lead .supervisor provide him with comprehensive industry knowledge from project inception to completion. As Vice President of Project Management, vent, he coordinates office and field operations, ensuring the highest standards for utility location accuracy.
Featured pr ject experience
SR -55 Widening Potholing, Orange County, CA: Oversaw a large- scale project requiring 155 potholes across a major highway corridor.
Mr. Vargas ensured all necessary permits were obtained and worked closely with technicians to review findings. He managed field operations,, coordinated traffic control plans, and communicated progress and challenges with the client to maintain timelines and budgets.
Lambert Rd Potholing Investigation, Whittier, CA: As Project Manager, Mr. Vargas took charge of all permitting and collaboration with the USA DigAler t system. Fie ed field technicians to locate and mark underground utilities safely and efficiently, ensuring the client had precise data for construction planning while adhering to budget constraints.
Highland and Cedar Potholing, San Bernardino, CA: Managed a complex project involving 39 potholes and 7 slot trenches for the San Bernardino Water Department, Mr. Vargas coordinated permitting, technician schedules,, and on -site safety measures while maintaining clear cominurication with the client to address evolving project requirements.
Jeffrey Potholing Investigation, San Diego, CA: Supervised 57 potholes along busy urban corridors. He ensured smooth traffic control implementation, timely permit approvals, and the accuracy of technician findings. His proactive client communication and attention to safety protocols were critical to the project s success.
Grove/Holt Potholing Investigation, Ontario, CA: Directed a potholing project for Parsons that required high -precision locating rand documentation. Mr. Vargas handled perrnits, coordinated technicians, and reviewed findings to ensure the client received reliable utility data critical for their infrastructure development.
11'Tf. VefrL'u A riitvf.dE°1-ax,'le' f?P ,vFd(tt$tP�8WP8,uf 4741 f:i. , 7ringlh..... tR'bP`o�'$ 197.df8P.y, fd7d`d"":k1-2� 1iedl`O1"ces (. fie'r'(bh'�`Cc1TIOTOTillellit to del/he-hew drip.'7raffieIeCd oc urac;V Cold service (it' CCffrl/cc,
INC
Lighting Specialist and
Senior Electrical Design
Engineer with 32 years
of experience
Education
• Autodesk Building Systems
Licenses and more
• LC Credential, National Council
for Qualifications for the
Lighting Professions (NCQLP),
2002.
• IESNA
Gary Jewell I Lc
Project Role: Lighting Specialist Project Manager
Gary Jewell has over 32 years of electrical design experience ranging from tenant improvements to new construction. His experience includes power.and lighting systems design fotil.nstttutional„commetciat and industrial projects. He has extensive knowledge of lighting systems, products, andapplications. Gary has served as project manager, determining the project scope, coordinating with clients, coordinating with sub -consultants, and providing construction design documents.
He has served as lead designer engineer on various power and lighting projects with responsibilities that include field investigation, creating proposals, developing construction docurnents, specifications, and cost estimates, providing construction support and commissioning. Gary's broad knowledge of lighting design principles coupled with his ability to use the latest lighting design programs enables him to produce detailed lighting studies and analysis for numerous projects each year.
Featured pr wject experience
* City of La Mirada, CA
La Mirada Creek Park
Neff Park Improvements
* City of La Palma, CA
La Palma Park Promenade
* City of Los Angeles, CA
FDR Park Improvements
* City of Monterey Park, CA
Edison Trails Park Playground
Equipment Grounding
* City of Pleasanton, CA
Ken Mercer Skate Park
Renovation
* City of San Jose, CA
Columbus Park Soccer Facility
Poer & Lighting
* City of San Juan Capistrano,
CA
Serra Park Playground
Grounding
▪ City of Santa Barbara, CA
Ortega Park Power K. Lighting
* City of Santa Monica, CA
Dwight Murphy Park
Renovation
City of Temple City, CA
Live Oak Park and Temple City
Park Improvements
City of Wildomar, CA
27 Acre Park
Wildomar Park Power &
Lighting
County of Los Angeles,
Rowland Heights, CA
Schabarurn Regional
Park Lighting K. Power
Improvements
County of Los Angeles, San
Dimas, CA
F. G. Bonelli Regional Park
Olympic Planning Feasibility'
Study
City of Santa Clairita, CA
New LEED Silver Canyon
Community Center
City of Laguna Beach, CA
Promenade on Forest
Pedestrian Plaza
68 City of Bell Gardens Page 577 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
INC.
Mechanical Engineer
with 12 years of
experience
Education
• BS, Mechanical Engineering,
Iowa State University
Licenses and more
• Mechanical Engineer,
California, M37387
• ASHRAE
Management and Staffing I Section 2
Nate Behning I PE
Project Role: Mechanical Engineer
Nate Behning has 12 years of experience in mechanical engineering and HVAC consulting; His experience includes new building ane renovation projects at university and college campuses, office buildings, and athletic facilities. Services have ranged from mechanical equipment replacement to new building design and energy studies. Nate has served as a mechanical engineer on various HVAC airside and Hydronic system design projects. His responsibilities entail schematic/conceptual design, construction documents/drawings, life --cycle cost analysis, energy modeling, and construction administration services. His project experience ranges from small tenant improvement projects to large building renovations and new building design.
Featured project experience
• County of Los Angeles,
Malibu, CA
LEED Silver Camp Kilpatrick
Juvenile Detention Center
• City of Lawndale, CA
City Hall HVAC Upgrades
• City of Gendale, CA
Alex Theater
• Los Angeles Mission College,
Sylmar, CA
LEED Gold Media Arts Center
• Los Angeles Community
College District, Los Angeles,
CA
Los Angeles Trade Tech New
Culinary Arts Building
• East LA College, Monterey
Park, CA
LEED Silver Design Math and
Science Complex
• Riverside City College,
Riverside, CA
LEED Silver Student Services &
Administration Building
• San Bernadino Valley College,
San Bernadino, CA
New LEED Silver Gymnasium
• Crafton Hills College, Yucaipa,
CA
New LEED Gold Public Safety &
Allied Health Complex
•
•
•
•
Mt. San Antonio College,
Walnut, CA
LEED Silver Design Business and
Technology Facility
Mt. San Antonio College,
Walnut, CA
New LEED Silver Design Student
Center
Golden West College,
Huntington Beach, CA
Math & Science Building
Crafton Hills College, Yucaipa,
CA
New LEED Platinum Crafton
Center
San Bernadino Valley College,
San Bernadino, CA
LEED Silver Applied Technology
Building Replacement
Santa Ana College, Santa Ana,
CA
Central Plant Feasibility Study
San Marino Unified School
District, San Marino, CA
District: -wide HVAC
Modernization
INC
Electrical Engineer with
12 years of experience
Education
• BS, Electrical Engineering,
Pennsylvania State University
Licenses and more
• Electrical Engineer, California,
E22361
Lars Henderson I PE
Project Role: Electrical Engineer
Lars Henderson has over 12 years of experience creating electrical designs for the construction industry. Assignments have included .educational institutions, commercial fit outs, municipal sites, and nission-critical facilities in the Los Angeles and New York City markets, Electrical service designs, landscape power renovations, and energy - efficient lighting ripgrades are areas Lars has accomplishments. Beyond the compliances and routines of designing, it: is the client's end goal that Lars strives emphasis towards.
Featured project experience
* City of Beverly Hills, CA
Beverly Gardens Park: Lighting
and Power
• LA County, Los Angeles, CA
Deferred Maintenance for 5
Park Sites
* City of Encinitas, CA
Olympus Park (formerly
Standard Pacific) Lighting and
Power
* Culver City, CA
City Courthouse Core and
Tenant Improvements
• City of Glendora, CA
Glendora Library Expansion
Study
• City of Indio, CA
New City Hall
• City of Indio, CA
Indio Public Safety Campus
Including Fire Station,
Administration Buildings & Call
Center
* City of Indio, CA
Police Station Assessment
• City of Santa Monica, CA
Dwight Murphy Park
Renovation
• City of Temple City, CA
Live Oak Park and Temple City
Park Improvements
• City of Santa Clarita, CA
New LEED Silver Canyon
Community Center
* City of La Mirada, CA
Fire Station 5 Tenant
Improvements
e City of Santa Monica, CA
F. G. Bonelli Regional Park
Olympic Planning Feasibility
Study
• City of Santa Monica CA
7th Street Beautification
* Construction Support
• San Francisco Fire
Department, San Francisco,
CA
Fire Training Facility MEP
Design Criteria
• City of Vacaville, CA
Electric Bus Charging Stations
Electrical Infrastructure
• LA County Internal Services
Dept., Los Angeles, CA
Centro Marav'illa Power &
Lighting Upgrade Criteria
• LA County Internal Services
Dept., Pomona, CA
Pornona Department of Public
Social Services Building HVAC
System Replacement
70 City of Bell Gardens Page 579 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
INC
Senior Plumbing Design
Engineer with 21 years of
experience
Education
• A5, Computer Aided Drafting,
ITT Technical Institute
Licenses and more
• Certified in Plumbing Design
(CPU)
• Plumbing Design, University of
California, Los Angeles
• ASPE
• Green Plumbers°
Management and Staffing I Section 2
Eric Gomez I CPD
Project Role: Plumbing Design Engineer
construction administration. Eric has significant expertise in educational, recreational and office facilities. He has designed a cornprehensive range of plumbing and fire protection systems such as campus natural gas supply distribution as part, of master planning for future expansions on various college and university campuses. Eric has served as project manager and design engineer on various plumbing system design projects with duties encompassing determination of project scope, design criteria, coordination with the client and project team, provision of construction design documents, written construction design specifications„ equipment selections, construction cost estimates, construction support and project management,
Featured pr wject experience
• City of Baldwin Park, CA
Civic Plaza Zocalo Park
• City of La Mirada, CA
Neff Park Improvements
• City of Costa Mesa, CA
Library ADA Upgrades
• City of Indio, CA
New City Hall
• City of Indio, CA
Indio Public Safety Campus
Including Fire Station,
Administration Buildings & Call
Center
• City of Ontario, CA
Access Center & Multi -Purpose
Building
• City of Ontario, CA
Ontario Motor Inn Retrofit to
• Transient Housing
• City of Pomona, CA
Department of Public Social
Services Building HVAC
Replacement
• City of Redlands, CA
Police Station MEP Design
•
•
•
•
•
•
*
City of Santa Clarita, CA
New LEED Silver Canyon
Community Center
City of Santa Cruz, CA
Tannery Dance & Performance
Building
County of Los Angeles, Los
Angeles, CA
Hall of Records 7th Floor HVAC
Modifications
County of Los Angeles,
Malibu, CA
LEED Silver Campus Kilpatrick
Juvenile Detention Center
San Bernadino Valley College,
San Bernadino, CA
LEED Silver Applied Technology
Building Replacement
Santa Ana College, Santa Ana,
CA
Central Plant Feasibility Study
County of Los Angeles,
Arcadia, CA
Live Oak Library Renovation
INC
Lighting Designer with
10 years of experience
Education
• MS, Building Science, University
of Southern California
• Master of Architecture,
University of Tehran
• BA, Architecture, Azad
University, Tehran, Iran
Licenses and more
• LEED Green Associate,
IDt110586451, 2012
• LC Credential, National Council
for Qualifications for the
Lighting Professions (NCQLP),
2023
• IESNA
Ellie Motevalian i Lc
Project Role: Lighting Designer
Ellie (Elham) Motevalian has more than 10 years of architectural and lighting design experience ranging from hospitality and retail to educational, healthcare; and corporate projects. Her experience encompasses conceptual lighting design, fixture selection, photometric studies, daylight and visual comfort analysis. Elbe's award -winning knowledge of lighting design and new lighting technologies enables her to design solutions that rneet the clients' needs and expectations.
Featured pr ject experience
• City of La Mirada, CA
Neff Park Renovation
• City of La Palma, CA
La Palma Perk and Swan Street
Parking Lot Renovations
• City of Long Beach, CA
Bixby Park Bandshell Lighting
Lighting Improvements
• City of Wildomar, CA
Wildomar Park Power &
Lighting
• County of Los Angeles Public
• Works, Marina del Rey, CA
Chace Park Electrical &
Plumbing
• Design
• City of Beverly Hills, CA
Judy Chicago Artwork Lighting
• City of Indio, CA
Indio Public Safety Campus
Including Fire Station,
Administration & Call Center
• City of Santa Monica, CA
Dwight Murphy Park
Renovation
• City of Temple City, CA
Live C)ak Park and Ternple City
Park Improvements
• City of Mammoth Lakes, CA
Mammoth Lakes Civic Center
Renovation
•
•
City of Indio, CA
City Hall
City of Indio, CA
New Police Department
Headquarters
City of Santa Clarita, CA
New LEED Silver Canyon
Community Center
City of Redlands CA
Police Station
County of Los Angeles Public
Works, Los Angeles, CA
Civic Center Central Plant
Phase 2
County of San Bernardino,
Colton, CA
Building 851 Cooley Renovation
County of San Bernardino, San
Bernadino, CA
Fire Station #41
County of San Bernardino,
Victorville, CA
Victorville District Attorney's
Office Remodel
Yorba Linda Friends of Church
Yorba Linda, CA
New Pavilion & Cate Building
Lighting Design
72 City of Bell Gardens Page 581 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Project Manager and
Principal with 33 years
of experience
Education
• MS Civil Engineering
(Geotechnical Concentration)
California State University,
Long Beach, CA
• BS Civil Engineering, California
Polytechnic State University,
San Luis Obispo, CA
Licenses and more
• Registered Professional Civil
Engineer, State of California
(RCE No. 49679)
• Registered Geotechnical
Engineer, State of California
(RGE No. 2371)
• American Society of Civil
Engineers, LA Section
Administration Committee,
Chair 1991-1998
Management and Staffing Section 2
Paul R. Schade I GE
Project Role: Geotechnical Engineer
Since 1989, Paul has provided geotechnical consulting services on a variety of geotechnical projects, including low -to -high rise (up to 26 stories) buildings, parking structures, hospitals, retail -centers, ,, courthouses, sports arenas and stadiums, parks, educational and recreational facilities, airports, pipelines, entertainment Facilities cathedrals and churches, landfills, bridges, military base facilities, tanks, roadways, and forensic studies.
Paul has been the Project Manager and Principal -in -Charge for three County c)f. Los Angeles on -call geotechnical and materials testing contracts (2011 to 2021), as well as five consecutive 5 -year on -call geotechnical contracts for the Los Angeles Unified .School District (2000 to 2025), He has extensive experience in foundation design, including using ground improvement techniques to support settlement sensitive structures with high column loads on shallow spread foundations, Featured pr.ject experience
• Earvin "Magic" Johnson Park,
Compton
* Park to Playa Pedestrian Train,
Culver City
* Dan Blocker Beach Park Area,
Malibu
* Biola University Athletic Field/
Parking Structure, La Mirada
* Neff Park, La Mirada
* Home Depot, La Mirada
Prologis Industrial
Development, La Mirada
* Oxford Retention Basin,
Marina del Rey
* San Gabriel Valley Aquatic
Center, La Puente
* White Point Park Renovations,
San Pedro
* Burton Chase Park,
Marina del Rey
* Whittier Narrows Park
Improvements, Whittier
OCF I, Inc,
Cost Manager with 13
years of experience
Education
• B.A Ethical & Political
Philosophy, Brown University,
Providence, RI
Licenses and more
• Society of American Military
Engineers, SAME
• Association for Advancement of
Cost Engineering International,
AACE International
• American Society for
Professional Estimators, ASPE
Conor Clarke
Project Role: Cost Manager
Conor brings diverse experience providing cost estimating, financial analysis and project controls. He is responsible for quantity analysis, on -screen takeoff, specification review, and preparation, of crew based cost models, as well as client relations and the attraction of new business. Conor works, as an integral member of the cost management team throughout the duration of each individual project. His versatile strengths have been utilized on projects within the municipal, government, educational, healthcare, and hospitality sectors. Conor has worked on projects with values ranging from under $1 million to more than $1 billion.
Featured project experience
• Civic Improvements and PD
Restroom Modifications,
Downey
• Community Center HVAC.
Replacement and Roof
Recovering, Las Vegas
• La Mirada Creek Park Vehicle,
Bridge Project, La Mirada
• Expo Park Dispatch Relocation,
Los Angeles
• Exposition Park Fall Protection,
Los Angeles
• Exposition Park Pay Stations &
Gate, Los Angeles
• Five Wounds Trail, San Jose.
• Measure S Projects, Downey
• Neff Park, La Mirada
• Parks and Recreation and
Streets Department, Vancouver
City of Bell Gardens Page 583 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Senior Cost Estimator
with 9 years of
experience
Education
• BS, Civil Engineering California
State University, Long Beach
Management and Stuffing Section 2
Gary Mao
Project Role: Senior Cost Estimator
As a Senior Cost Estimator with over 10 years of experience in construction, engineering, and real estate developrnent, Gary provides budget strategies and value engineering to increase certainty throughout each step or a project's development lifecycle. He has been involves in a wide-ranging portfolio of complex projects, frorn local community -driven ;a ilities to large-scale mixed -use towers.
From procurement strategy to monitoring risk, Gary advises project teams on ways to align scope and design with the budget. As an advisor and partner, Gary works collaboratively with tears members to serve as an extension of the owner's development process in both the public and private sectors.
Featured project experience
• Cabrillo CCD: Pedestrian Bridge
Repair and ADA Upgrades
• CA DGS:SB1203
Decarbonization Planning
• City of La Mirada: Neff Park
Improvement
• County of Sacramento: RCCC
Control Room Renovation
• DOI NPS: Edgar Allen Poe
House,, Replace H\/AC
&Electrical System
• Fremont Union I -15D: Field
House
• Fremont USD: [HS C `E alad
Maintenance Building
• Indian Health Services (IDS):
Fort Yurna Monument Design
• La Mirada Creek Park Ve.hichle
dge Protect:
• Neff Park, La (Mirada
• New Mexico Dept of Public.
Safety: LERB Interior Tenant
Irnprovernents
•
•
•
•
•
•
•
•
•
•
New Mexico Dept of Public
Safety: Metropolitan Complex
New Mexico General Services
Dept: Veteran Skilled Nursing
and Small Homes, Enhanced
Accessibility Assessment
Oak Grove SD: Baldwin
Elementary School
Modernization
Peacerlealth: St. Joseph
Medical Center West Pavilion
Resurrection Greek Orthodox
Church: New Site and Building
San Marcos USD: Knob Hill
Elementary School Whole Site
Modernization
UCSF: Parnassus Hall Millberry
Union East Third Floor Remodel
VA: Fresno, Seismic
Rehabilitation
VA: Tucson: Plum g
Replacement
VA: Walla Walla Solar Array
Section 't
hree:
hree°
Qualifications, Experience and
References
Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
RRM Project Pictured:
Righ t Ranch Parks, Son Luis Obispo, CA
Exterior Community Spaces and Park Facilities
Stages, Arnpitheaters, Restroorns, Storage/Maintenance Buildings RRM Design Group has extensive experience designing and revitalizing public parks with a strong emphasis on functional infrastructure that supports community programming and long-term maintenance. Our work includes the planning and design of outdoor amphitheaters and community stages that serve as focal points for cultural events and gatherings, as well as the integration of accessible restroom facilities and strategically placed storage and maintenance buildings to support daily operations. We understand the importance of blending utility with aesthetics creating spaces that are both inviting and durable. i. Mla's Dream Come True Playground & Park - ADA Restroom, Santa Barbara, C'A
2. La Palma Park - Stage and Gathering Space, Anaheim, CA
3. San Lorenzo Community Parke Restraorrr Facility, San Lorenzo, CA
4. Ventura Harbor Village Parcel 5 Visioning .- Stage and Gathering Space, Ventura, CA S. Harbor View Park - Stage, Oxnard, CA
6. City Heritage Park - Restroom Facility and Picnic Area, Parlier;, CA . Alex Fiore Teen and Goebel Adult Community Center - Stage (Shade Sail Covered), Thousand Oaks, CA 78 City of Bell Gardens Page 587 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Qualifications, Experience and References Section 3
Interior Com
munity Spaces
(T ethering, Kitchens and Multipurpose Spaces
RRM Design Group has a strong track record in designing interior community spaces that foster connection, creativity, and functionality. Our experience includes the renovation and new construction of recreational halls, flexible activity classrooms, and multi -use community centers that support a wide range of programming needs. We specialize in integrating essential amenities such as commercial -grade kitchen facilities, ADA- compliant restrooms, and indoor stages to support performances, events, and cultural gatherings. With a focus on durability, accessibility, and user comfort, our designs reflect the unique character of each community while meeting operational and maintenance needs. RRM's collaborative approach ensures that each space is thoughtfully planned to serve both current and future generations.
1.. Santa C7arita Community Center, Santa Clarity, CA
2, Alex Fiore 'Teem and Goebel Adult Community Center Interior Stage and Event Roorn, Thousand Oaks, CA
3. Santa Clarity Community Center - Basketball Court and Recreation Room, Santa Clarity, CA 4, Oakdale Community Center - Kitchen Facility, Oakdale, CA 5, Carlsbad Police avid Fire Department Training Center Class Roorn, Carlsbad, CA 6, Alex Fiore Teen and Goebel Adult Community Center Came and Recreation Room, Thousand Oaks, CA
7.. Solvaraq Schaal Culinary Arts Building - Kitchen Facility, Solvcmg, CA 80 City of Bell Gardens Page 589 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Qualifications, Experience and References
Section 3
Athlete and Play Elements
Sports (Fields, Sports Courts, Shade Structures and Splash Pads RRM Design Group has extensive experience designing and renovating athletic and play facilities that promote active lifestyles and community engagement. Our work includes multi -sport fields and courts such as basketball, tennis, futsal, and volleyball —enhanced with durable surfacing, integrated shade structures, and ADA-accessible spectator seating. We've successfully implemented stadium and field lighting systems that extend usability into evening hours while meeting safety and energy efficiency standards. RRM also specializes in designing interactive splash pads and play zones that combine fun, safety, and visual appeal. Our comprehensive approach ensures that each recreational element is thoughtfully planned to support long-term maintenance, programming flexibility, and inclusive access for all ages.
1... Grove Park - Basketball Courts, Tennis Courts and Baseball Field Renovation, Berkely, CA
1.. Paige Lane Neighborhood Pork - Volleyball Court, Thousand Oaks, CA
3. San Pablo Park improvements .• Tennis Courts Rennavation and Covered Bleachers, Berkeley, CA 4, William Payne Park Master Pion Covered Futsal Courts, Livermore, CA °S. Sari Lorenzo Community Park - Basketball Court, San Lorenzo, CA f y Gra' stare Neighborhood Park - S'Pla.shpad, Bakersfield, CA a.
7. Alex Fiore Teen and Goebel Adult Community Center - Basketball Court, Shade Sail and Stage, Thousand Oaks, CA
82 City of Bell Gardens Page 591 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Qualifications, Experience and References
Section 3
La
ndscape and Rest Elements
Pathways, Gardens, Pienfe Areas
RRM Design Group excels in designing serene and functional landscape spaces that invite rest, reflection, and community gathering. Our experience includes the integration of native and drought -tolerant plantings, therapeutic gardens, and shaded picnic areas that enhance both ecological value and user comfort. We thoughtfully design pedestrian pathways and seating zones to encourage accessibility and circulation while supporting passive recreation. Whether creating quiet garden retreats or vibrant social nodes, RRM's landscape architecture balances beauty, sustainability, and long-term maintenance to enrich the overall park experience.
1... Grove Park - Picnic Area, Berkeley, CA
2. Olympus Park - Gardens card Picnic Shelter, Encinitas, CA
3. Lindero Linear Park - Gardens and Pathways, Westlake Village, CA
4. Kennedy Park - Pathway and Gardens, Hayward, CA
5. Paige Lane Neighborhood Park - Gardens and Picnic Shelter, Thousand Oaks, CA G'. Downey Furman Park Improvements - Gardens, Picnic Shelters and Pathways, Downey, CA y. Greenwood Park - Flower Shade Sail Structure and Picnic Area, Hayward, CA
8. Veterans Park Picnic Shelters, Livermore, CA
as City of Bell Gardens Page 593 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Qualifications, Experience and References Section 3
Downtown Tulare, and specifically Zumwalt Park, needed a boost. The City saw its potential —not just as a park, but as a central gathering place and economic catalyst for the entire downtown core. RRM partnered with the City to reimagine the park from the ground up. Our team led the project from early visioning through entitlement and construction documents. Early on, we hosted an open house -style community event to shape the design around what residents wanted most: an active, welcoming space that could support. a wide range of community uses.
The new Zumwalt Park delivers just that. At its center is the Adventist Health Amphitheater, complete with a stage, green room, dressing rooms, terraced seating;, and a cooling misting system. We also added a splash pad, a modern playground,, enhanced landscaping and lighting, new restrooms, a refreshed gazebo, and thoughtful streetscape improvements.
Funded by the American Rescue Plan Act (ARRA), the park officially reopened in 2025. Since then, it has become a vibrant community hula, hosting concerts, festivals, fitness classes, and public events —many programmed in partnership with Spade Entertainment. The renewed Zumwalt Park is helping breathe new life into downtown Tulare.
C heat
City of Tulare
Location
Tulare. CA
RRM Disciplines involved
• Lundscnpe Architecture
• ArchiteLture.
RRM Key Mariafjets tt
Professionals
• Lief McKay Principal
• Amanda Scibel Project Manager
• rad Lupton Architect
Project Size
3.5 Acres
project rDrneline
2022 2025
86 City of Bell Gardens Page 595 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Qualifications, Experience and References Section 3
Client
City of Downey
RRM Design Group was selected by the City of Downey to lead the design and implementation of park improvements at Discovery, 'Lerman, and Independence Parks. Completed within a six-month timeline( these projects reflect our ability to deliver high -quality, community -responsive desi€_,ns under tight schedules. Each park plan was tailored to preserve the existing character while enhancing usability through thoughtful (upgrades such as new picnic shelters with electrical connections, expanded B3Q and seating, areas, and upgraded restroonas and rraintenancefstc>rage faci€hies to support lortg- terrn operations.
Recreational enhancements i ;eluded multi -sport courts, resurfaced play areas, improved fencing and backstops, and a revitalized fitness circuit..
Discovery Park's synthetic turf soccer field and IVIusco Sports Lighting extended playability and safety into the evening hours. Landscape and garden improvements were integrated throughout the parks to enhance aesthetics, shade, and environmental resilience. These comprehensive upgrades demonstrate RRM's commitment: to creating inclusive, flexible, and sustainable puf.al,c space
Location
Downey, CA
P?Zh Disciplines Ilnvoived
• Landsu,pe Architecture
• Cm/ Engineering
• Surveying
Key Managers & Profea:9suionais
• Mike Sher -rod Principal/Project
Manager
• Kayla Szubielski Project Manager
• AmondaSeibel Design Director
• Michael Doremus Structural Engineer
• Diane Bathgate Planning Principal
Project: 'Tireliere
erns -2020
as city of Bell Gardens Page 597 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
A ONg
Qualifications, Experience and References
Section 3
Orient
Conelu Re(.,eatron and Purk D,[r,ci
90 RPM Design Growl was selected by the Conejo Recreation and Pat k District and the City of Thousand Oaks to prepare landscape architectural and architectural design services for the Alex Fiore Teen Center and Goebel Adult Communjty Center Master Plan Project improvements at an existing park facility site. The project consists of various site upgrades and air overall modernjCatiorl of the ex'stingstructure, including an outdoor multi use court and event area, shaded gathering are d, alternative game area, outdoor classrooin/activity area, skate plaza, shaded outdoor fitness area, with renovations of existing restrooms, kitchen,storage, outdoor patio, miscellancaous updates, ceiling improvements, security system, outdoor speakers, exterior electrical and lighting uot;rades,
&..ocap on
1 housand Oaks, CA
PRIM Discip !!nes Involved
• Land.. cape Ar, tute'rrtine,
• Architecture,
• civ,I Cnurr ,,ng
• Structui al Lngineeung
• SL,recong
Key Managers & Profess•ionaas
• Lief McKay Principal
• lance Wicrschern Project Manager
• Michael Doremus Structural
Enq,neer
R ee lline
?O]9-20;3
City of Bell Gardens Page 599 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Qualifications, Experience and References
Section 3
ttweg
Np�p A
C smut
city of La Mirada, CA
4:.
1 he City of La Mirada hired RRM Design Group to develop a schematic plan and renderings for Netr Park that would eventually continue through the construction documentation process, Neff Park is nestled into the center of a suburban rieighborhood ri La Mirada with a unique hisforlct background.
Three structures remain and some sport courts, a playground, and picnic areas have been added. Asa part of the design phase, RRM's team designers upgraded sport court facilities, picnic areas including a picnic structure, updated restroo ii facilities, a perimeter path, low water use planting and dealt with drainage issues with the use of a naturally planted swaie. Based on City and community input, the dcaign was irr,psoved upon and is now ready for the construction documentation phase.
Location
La Miroda, CA
RRM Ktit�'llOl1'es irPvoll\ ec
• Landscape Architecture
• civil Engineering
• Architecture
Key Managers & t'u oia^r»e'ruonafi s
• Lief McKay- Principal
• Lance //ierschern - Project rvluouger
• Amanda Seibel pi- Design Director
• Tod Lupfon- Architect
• Pslichael Doremus -Structural Engineer
p,r'ou4 t ;rj7.6,,
10 Acres
I sine^?,''Ilse;
2023 -Present
(iry of Bell Gardens Page 601 of 817
Desogn, Architecture aanar Engineering `ofvicesfor The Veterans Park RcfurbsViment and Restroom Renovation
the City of Anaheim envisioned this important project to enhance recreation opportunities and the quality of life for the community at large, After extensive community engagement, a conceptual site plan was created. Our learn was hired to work with the City, Staff, and Stakeholders to further develop the plan according to the communities' needs and desires and elevate the concept by creating a meaningful place, not just a design.
RRM's history working on the park, street, and parking lot with the City of Anaheim has p°uven successful. La F'aIrna Parkway is currently u•'der construction, and Swan Street: Parking Lot has been permitted. La Palma Park and the construction of Swan Street Parking Lot are the final pieces to complete this valuable trifecta tor the City,
Qualifications, Experience and References Section 3
Client
CII y of Anaheim
Location
Anaheim, CA
PRM Dlscilpliilnes Involved
• Landscape Architecture
Key IP1auraagers R Professionals
• mike Sherrod - Principal/Project
Manager
• Amanda Seibe! Design Director
• Rachael Guraydin Senior
Landscape Architect
• Noah Walters Civil Engineer
• Michael Doremus Structural
Engineer
• Steve Webster Supervisor of
Surveying
• Cordlan Hank Engineer II
Project T'iineline
O L9-Pre->enl
Client.
City of Porterville
V.oca`M, on
Porter wile, CA
The Por-terville Community Center and Park project will transform an under -developed public lot into a vibrant recrea'ional space. The park features an ADA playground, splash pad, challenge courser, mini pitch soccer arena, climbing boulder, punao track, trail, and sheltered picnic areas. The community center, designed as an indoor facility, will allow citizens a space to exercise and gather- while being shielded frorn the area's poor air qualify, caused by various agricultural activities. This projec' aims to address the lack of amenities in the area and foster community engagement, while also considering the environmental and social challenges faced by the city.
The ADA playground will ensure inclusivity for children of all abilities, while tyre pump track caters to biking and skateboarding enthusiasts. The fully connected trail system will enhance accessibility for walking, jogging, and cycling. 1 he community center will serve as a hub for various events and activities, promoting social interaction and physical well-being. Overall,, the project will revitalize the public land, providing a dynamic and inclusive space where residents can come t:c.getfrer, enjoy indoor and outdoor activities, and strengthen community bonds.
P.RM Discicrolines 6nvolved
• LundscopeArchitec- re
• Architecture
Key (Managers & Professlonr s
• Lie)f 4,1cKay - Principal
• Lonce Wrerschem - Project Mm uger
• Amanda Seibel - Design Director
• Tod Lupton - Architect
• Michael Dot emus - Structural Lngineer
Pro,lect Timeline
2022 Present
94 Geer of Sell Gardens Page 603 of 817
Design, Architecture and Engineering Sea vices for The Veterans Park Refurbishment and Restroom Renovation
Ckie�rrrt.
City of Encinitas
The City of Encinitas tasked RRM with transforming a blank SEate of land int a 3.1 -acre neighborhood park. A robust public outreach process defined community's desires and set the program, i-icluding space for yoga and fitness classes, dog park, skate feature and bike pump track, colorful play elements with an adventure hill, picnicking, shade structures, I.aub(ic art, an a garden designed in collaboration with the San ?Diego Botanical Garden.
The ongoing success of this park was due to effective public outreach and collaboration with City staff, namely Public Works, Parks, Recreation and Cultural Arts Department, and maintenance staff, Olympus Park has been honored with several awards and remains a top visited park in San Diego County.
Quali,llcatlons, Experience and keterence3 j Section S
d
V,ocatiVen
Encinitas, CA
9'f.RM Discirornes 6nvolvea'9
• LundscopeArchiteL re
• Civil Engineering
• Surveying
Key Managers & Pro'c'essionals
• Jeff Ferber - Principal
• Arnundu Seihel - Project Manager
• Rachuel Guru cdn -Senior
Landscape Architect
Project Sze
3.1 Acres
Project Timeline
2017-2021
Orient
City of BakerVield
96 Wor king closely with the City's Parks and Public Works staff, RRM Design Group provided landscape architectural services vices to develop the design born concept to construction on this eight -acre neighborhood park. The final park elements, which were a direct result of community input gathered at anRRM facilitated community meeting, include a large shade structure, playground, splash pad, basketball courts, group and individual picnic areas, d paved perimeter loop path, flexible open grass areas, restroorn and parking lot.
RRM also provided full design services for r i new rirc station that is located within the park boundaries.
Location
Bakersfield, CA
RPM Dhic'iprines„ inyoiyed
• Londscupe Arc hnec Lure
Key Managers & Professionals
• Mike Sherrod Principal/Project
fv1onager
• Lief McKay Project Manager
• Amanda Seibcl Design Director
"Project Size
Acres
P'rojoct'1r.uncfline
200/-LU11
C.t;' of Bell Gardens Page 605 of 817
Design, Architecture and Engineering ServicesforThe Veterans Park Refurbishment and Restroom Renovation
krlliient
City of Wildomar
RRI\1 is guiding community outreach, trail design, habitat enhancement, and park inasler planning fora 27 acre regional park in Wildonrar, CA. This future park is undeveloped land with natural open space and hilly terrain. The goal s to preserve natural scenic elements of the si`e while creating a recreational space that all members of the region car enjoy. f he preferred concept plan includes a community building and amphitheater, natural adventure play, waking paths and trails, creek enhancement, bike pump track and skills course, exercise stations, community green, and interpretive educational experiences throughout the park. RRM is currently working on Phase 1 of the park project to he built in the next couple of years
Qualij!cations, Experience and Hejerences ' Section S
Location
V'✓ildomar, CA
RPM UU,,c'u alines InvoOved
• Londxupe Arc hrtec Lure
• Architecture
• Civil Engineering
• Surveying
Key Managers & PIro`ess4onals
• Mike Sherrod Principal/Project
Manager
• Rachael Guroydin Project Manager
• Amanda Seibel Assistant Project
Manager
• Jeff Ferber Princiaat Planner
• Tad Lupton Architect
• Noah Walters Civil Engineer
• Cordian Maszk - Engineer II
• Steve Webster - Supervisor of Surveying
Project Size
27 Acres
Project T"imeuBne
201.7 Piesen(
C mmunity and Cultural Integrity
Interpretive and Interactive Exhibits, and PublIle Art
RRM Design Group is deeply committed to honoring community identity and cultural integrity in every park and public space we design. Our approach is rooted in meaningful engagement with local stakeholders to ensure that interpretive elements, interactive exhibits, and public art installations authentically reflect the values, history, and character of the surrounding community. We thoughtfully integrate storytelling through design whether through culturally significant landscaping, educational signage, or art that celebrates local heritage. By weaving cultural expression into the physical environment, RRM creates spaces that foster pride, inclusivity, and a lasting sense of place.
Paige Lane Neighborhood Park - Tribute
to the Churnash People (Churraa.sh-theated
playground)
2. King City Plaza - Cultural and Historic
Interpretive LXhibits and Art
3. Oroviille Centennial Plaza • "A Chinese
Community" Interpretive Sign
4... Cheng Park Revitalization, .San Luis Obispo
5.,, Santee Arts and Entertainment District -
Outreach (English/Spanish)
98 City of Bell Gardens Page 607 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Q
ality Par
(S
hin BL
dget and Regulations
Grant and Phased Funded Public Agency Park Project Experience RRM Design Group excels at designing parks that balance quality, cost -efficiency, and long-term vision especially within the constraints of public funding, With deep expertise in grant administration, phased implementation, and project coordination, our team has successfully delivered over 20 grant -funded and phased parks and recreation projects. We work closely with municipalities and agencies to align design solutions with available resources, ensuring each phase provides meaningful community benefit. Beyond design, RRM offers comprehensive Public Works -related services including project, grant, and contract administration, and we are highly familiar with federal, state, and regional/local agency requirements. Our extensive experience spanning hundreds of city, county, and state/federal projects makes us a trusted partner in navigating complex funding landscapes and delivering beautiful, durable, and functional public spaces that evolve successfully over time.
1. ,Son Lorenzo Community Park - Phased, San Lorenzo, CA
2. La Mirada Creek Park _ Phased, La Mirada, CA
3. King City Park Plaza - Proposition G'8 Grant Funded, King City, CA
4. Whittier Greenway Trail and Trail East - Phased, Whittier, CA
5. 27 Acre Park - Phased, Wllomar, CA
6. Grove. Park - Proposition 68 Grant Funded, Berkeley, CA Qualifications, Experience and References Section 3
RRM Project Pictured: Whittier Greenwny Trail and Trail East - Shade Structure, Whittle, CA References
100 City of Bell Gardens Page 609 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
References
".See Appendix far" full Client Reference list on pages 7.12 and Z 13 Jodi Rios
Associate Project Planner
Contact: (714) 765-4901 I [email protected]
Client: City of Anaheim I City Hall, 200 S. Anaheim
Blvd., Anaheim, CA 92805
Project'. La Palma Park, Green Promenade and Paseo
'See page 93 for full case study
John Oskouum, PE
Assistant City Manager (Former)
Contact; (949) 350-9225 I [email protected]
Client: City of Downey 111111 Brookshire Avenue,
Downey, CA 90241
Project: Downey Measure S Park Improvement
Projects Furman, Independence, Discovery Parks
`See pages 88-8.9 for full case study
J'im Fried
General Manager
Contact: (805) 495-6471 I [email protected]
Client: City of Thousand Oaks 1403 West Hillcrest
Drive, Thousand Oaks, CA 91360
Project: Paige Lane Neighborhood Park
Qualifications, Experience and References Section 3
Cameron Luna
Associate Engineer
Contact: (951) 677-7751 I [email protected]
Client; City of Wilomar 123873 Clinton Keith Road, Ste. 201, Wildomar, CA 92595
Project: 27 Acre and 11 Acre Parks
*See page .J% far full caaSe study
Davide Norgard
Parks Operations Manager
Contact: (760) 633-2755 I [email protected]
Client: City of Encinitas 1505 S. Vulcan Ave, Encinitas, CA 92024
Project: Olympus Park
`:See page 95 far full case study
Jennifer Campben
City Manager (Formerly Assistant City
Manager and Director of Parks, Recreation,
and Cultural Arts)
Contact: (760) 633-2610 I [email protected]
Client: City of Encinitas 1505 S. Vulcan Ave, Encinitas, CA 92024
Section
Cost and Pricing
Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Pr pesal Price Sheet _. Attachment A:
The Proposal Price Sheet, labeled "Attachment A" for the Veterans Park Refurbishment and Restroom Renovation project, will be submitted as follows:
• Hard Copy Submittal: Included as a separate document enclosed in a sealed envelope. • Electronic Submittal: Provided as a separate PDF attachment via email.
For details regarding hourly rates and team availability, please refer to the Methodology Section, pages 46-53.
RRM Project Pictured:
Santa Clarity Community Center, Santa Clarity, CA
RRM Project Pictured: Kennedy Pork, Hoyword, CA
Section
Five:
Additions or
Exceptions
Proposal For Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
t
r
RRM Design Group does not have any additions or exceptions to the provisions and conditons of the City standard professional services agreement.
ACKNOWLEDGEMENT OF CITY'S STANDARD FORM OF AGREEMENT
I, the undersigned, certify that I, Jeff Ferber [insert name] am the Managing Partner [insert title] of RRM Design Group [insert proposer name], the party making the proposal for award of an agreement for DESIGN, ARCHITECTURE AND ENGINEERING SERVICES ("Proposer") and, on behalf of the Proposer, hereby:
Accept City's Standard Form of Agreement — check one box. ■ As is, without qualifications or modifications.
As modified by attachment. [Proposer to provide]
I certify that I am authorized to sign this Consent Form on behalf of the Proposer.
Executed this 2 day of October , 2025 at San Luis Obispo , California.
Signature of Officer Jeff Ferber Printed/Typed Name of Officer Managing Partner Title of Officer Senior Vice President Additions or Exceptions Section 5
22
Section Six:
Pending Litigation aid Ins
rance
Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
RRM Project Pictured:
Paige Lane Neighborhood Park, Thousand
Oaks, CA
RRM
t
gation
istory (5 Years)
Case Name: ET. AL. VS. CITY OF PISMO BEACH,
COUNTY OF SAN LUIS OBTSPO, STATE OF
CALIFORNIA, RRM DESi(;N GROUP
Date of Claim: 11/25/20
Claim Detail: RRM is supporting the City of Pismo
Beach in the defense of a claim that involves a pre -
manufactured play product. RRM prepared site plans
for the project and did not manufacture or install
the concrete play element that is the subject of the
personal injury claim.
Project Name: Pismo Beach Pier Plaza and Parking
Lot Upgrade and Price Street Streetscape
Project Owner/Respondent: City of Pismo Beach
Applicable Court: County of San Luis Obispo
Current Status: In litigation
RRM Project Pictured:
Redwood City Downtown Parks and Bay
Connectivity- Stage, Redwood City, CA
108 City of Bell Gardens Page 617 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
ACC)RDD CERTIFICATE OF LIABILITY INSURANCE
DATE (MMIDDf (MM/DONYYY)
7/2/2025
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
AssuredPartners Design Professionals Insurance Services, LLC 3697 Mt. Diablo Blvd Suite 230
CONTACT
NAME Sandy Peters
PHONE FAX
uvc, No. Exu; 626-696-1901 (A/C, No):
Lafayette CA 94549
ADDRESS: [email protected]
License#:6003745
INSURER(S) AFFORDING COVERAGE NAIC #
INSURER A: Trumbull Insurance Company ', 27120
INSURED RRMDESI 02
RRM Design Group
805 543-1794
3765 S. Higuera St., Suite 102
San Luis Obispo CA 93401
INSURER B , Travelers Casualty and Surety Co of America 31194 -INSURER C . Hartford Underwriters Insurance Company 30104 _.
INSURER D. Sentinel Insurance Company 11000
INSURERE:
INSURER F :
COVERAGES CERTIFICATE NUMBER: 1284423358 REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR ADDL SUBR POLICY EFF ' POLICY EXP
LTR TYPE OF INSURANCE INSP WVD POLICY NUMBER (MM/DDIYYYY) (MM/DDNYYY) LIMITS C
X COMMERCIAL GENERAL LIABILITY ', 84SBWBM5WFR I, 6/30/2025 6/30/2026 EACH OCCURRENCE "', $1,000,000
DAMAGE TO RENTED
CLAIMS -MADE X ', OCCUR ', ', ', PREMISES (Ea occurrence) $ 1,000 000 X Contractual Lob ', MED EXP (Any ono person) $ 10,000
Included ' '. PERSONAL & ADVINJURY $ 1,000 000
GEN L AGGREGATE LIMIT APPLIES PER "'. "'. GENERAL AGGREGATE $ 2,000 000 POLICY XJECT .. . X... LOC "', PRODUCTS COMP/OP AGG $ 2,000,000 OTHER. ,,. ',. --.. -..- $....
A
AUTOMOBILE LIABILITY $4UEGAC1692 ''. 6/30/2025 6/30/2026 ',. '..
X ANY AUTO ', ',
':.OWNED '.. SCHEDULED ', ', "'
AUTOS ONLY AUTOS
HIRED NON -OWNED
AUTOS ONLY ''. AUTOS ONLY ", ",
COMBINED SINGLE LIMIT $1000000
(Ea accident)
BODILY INJURY (Per person) $
BODILY INJURY (Per acedent) $
PROPERTY DAMAGE $
(Per _accident)
C
X UMBRELLA UAB X '', OCCUR
EXCESS LIAR CLAIMS MADE
DED X RETENTION$ to 000
,, 84SBWBM5WFR '', 6/30!2025 '' 6!30/2026 '' EACH OCCURRENCE $ 5,000,000 ', AGGREGATE $ 5,000 000
$
D
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y/N
ANYPROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED',
(Mandatory in NH)
If yes descr be under
DESCRIPTION OF OPERATIONS below
84WEGAG7CTV 6/30/2025 6/30/2026 X PER OTH
(_STATUTE ER
", N lA ", ", EL EACH ACCIDENT $1,000000
B Professorial Lability 107655124 6/30!2025 6!30/2026 Per Cie,. $2,000,000 aims M Aggregate Limit $4,000,000
Cl ade Form
DESCRIPTION OF OPERATIONS! LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AM Best's Rating of Policies above: A/XV or greater. The following policies are included in the underlying schedule of insurance for umbrella/excess liability:
General Liability/Auto Liability/Employers Liability. Professional Liability is E&O Liability.
Proof of coverage(s) for proposal purposes.
CERTIFICATE HOLDER CANCELLATION 30 Day Notice of Cancellation *Evidence
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
of Insurance'
AU .PRIZED REPRES ATIVE
© 1988.2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD Pending Litigation and Insurance Section 6
Section Seven:
Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
RRM Project Pictured:
Neff Pork Improvements. Lo Mirada, CA
L
avi or r - Parks Operations anager
Jennifer a -:yell - City anager
(Formerly Assistant City Manager and Director of Parks, Recreation, and Cultural Arts) Contact(s):
David Norgard: (760)-633-2755, [email protected] Jennifer Campbell: (760) 633-2740, [email protected] Client: City of Encinitas 1505 S. Vulcan Ave, Encinitas, CA 92024 ork and Services:
Relevant Project(s): Olympus Park, Encinitas, CA I 2017-2021:
RRM Design Group partnered with the City of Encinitas to transform a vacant 3.1 -acre site into Olympus Park, a vibrant community space. The park includes shaded fitness areas, multiuse basketball court, skate and bike park, therapeutic and botanical gardens, multiple picnic areas, a walking trail system, public art installations, Playground, and a community gathering space with lawn. RRM's collaborative approach with city departments and robust public engagement contributed to the park's award -winning success and high community usage.
Key Managers and Professionals:
• Jeff Ferber, Principal
• Amanda Seibel, Project manager
• Rachael Guraydin, Senior Landscape Architect
Jo i ios - Associate Project Planner
Contact: (714) 765-4901 [email protected]
Client: City of Anaheim I City Hall, 200 S. Anaheim Blvd., Anaheim, CA 92805 ork and Services:
Relevant Project(s): La Palma Park, Anaheim, CA I 2019 -Present:
RRM Design Group collaborated with the City of Anaheim to develop the La Palma Green Promenade and Paseo, a community -focused project that enhances recreational opportunities and public space. The design process included extensive community engagement and resulted in features such as improved landscaping, a pedestrian promenade, shaded gathering areas, and a flexible -use lawn space elements that align closely with the Veterans Park RFP. RRM's successful work on the park, adjacent street, and parking lot demonstrates their ability to deliver integrated, multi -faceted public space improvements that reflect community needs and elevate quality of life.
Key Managers and Professionals:
• Mike Sherrod, Principal/Project Manager
• Amanda Seibel, Design Director
• Rachael Guraydin, Senior Landscape Architect
a eron Luna - Associate Engineer
Contact: (951) 677-7751 I [email protected]
Client: City of Wilomar 123873 Clinton Keith Road, Ste. 201, Wildomar, CA 92595 ork and Services:
Relevant Project(s): 27 Acre and 11 Acre Parks, Wildomar, CA I 2017 -Present:
RRM Design Group is leading the planning and design of two major parks in Wildomar, CA a 27 -acre regional park and an 11 -acre community park —both of which feature elements closely aligned with the Veterans 112 city of Bell Gardens Page 621 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Park RFP. The 27 -acre park includes a community building and amphitheater with lawn seating, therapeutic gardens, walking trails, shaded exercise stations, picnic areas, and interpretive educational features. The 11 -acre park master plan balances active and passive recreation with amenities such as multiple sports fields, a large agrarian-themed play space, shaded picnic pavilion, walking loop with workout stations, and a community building housing restrooms, locker rooms, and concessions. RRM's thoughtful integration of natural features, recreational infrastructure, and community input demonstrates their capacity to deliver inclusive, multi -functional public spaces.
Key Managers and Professionals:
• Mike Sherrod, Principal/Project Manager • Tad Lupton, Architect • Rachael Guraydin, Project Manager • Noah Walters, Civil Engineer • Amanda Seibel, Assistant Project Manager • Cordlan Maszk, Engineer II • Jeff Ferber, Principal Planner • Steve Webster, Supervisor of Surveying John + skoui - Assistant City anager (Former)
Contact: (949) 350-9225 l [email protected]
Client: City of Downey 111111 Brookshire Avenue, Downey, CA 90241 ork and Services:
Relevant Project(s): Downey Measure S Park Improvement Projects Furman, Independence, Discovery Parks I 2018-2020:
RRM Design Group was selected by the City of Downey to prepare improvement plans for three neighborhood parks Discovery Park, Furman Park, and Independence Park delivering schematic design through construction documents within a compressed six-month timeline. Across the sites, RRM incorporated features that align with the Veterans Park RFP, including new restroom buildings, shaded picnic shelters with electrical connections, multi -sport courts, resurfaced basketball and tennis courts, upgraded fencing and backstops, fitness circuits, and enhanced landscaping. At Discovery Park, the addition of a synthetic turf soccer field and upgraded Musco Sports Lighting exemplifies RRM's ability to integrate durable, high-performance recreational amenities that serve diverse community needs.
Key Managers arid Professionals:
• Mike Sherrod, Principal/Project Manager • Michael Doremus, Structural Engineer • Kayla Szubielski, Project Manager • Diane Bathgate, Planning Principal • Amanda Seibel, Design Director
Jim Frie I - Genera anager
Contact: (805) 495-6471 l [email protected]
Client: City of Thousand Oaks l 403 West Hilcrest Drive, Thousand Oaks, CA 91360 ork and Services:
Relevant Project(s): Paige Lane Neighborhood Park, Thousand Oaks, CA 12017-2021 Paige Lane Neighborhood Park, funded by the Conejo Recreation and Park District and the City of Thousand Oaks, brings new recreational amenities to the community, including courts, a themed playground, fitness stations, and shaded picnic areas. The park connects to the larger Conejo Valley trail system and features sustainable design elements like drought -tolerant landscaping, permeable pathways, and preserved natural features. This collaborative project reflects community spirit and environmental stewardship while honoring local heritage.
Key Managers and Professionals:
• Jeff Ferber, Principal/Project Manager
• Lance Wierschem, Manager of Landscape Architecture
• Michael Doremus, Structural Engineer
• Steve Webster, Supervisor of Surveying
Appendix Section 7
PUBLIC ORKS DEPART ENT
8327 GARFIELD AVENUE • BELL GARDENS, CALIFORNIA 90201-6122 (562) 806-7770 FAX (562) 806-7789 • WWW.BELLGARDENS.ORG
REQUEST FOR PROPOSALS DESIGN, ARCHITECTURE AND ENGINEERING
SERVICES FOR THE VETERANS PARK REFURBISHMENT AND RESTROOM
RENOVATION
ADDENDUM NO. 1
August 15, 2025,
This addendum is being issued for the REQUEST FOR PROPOSALS FOR DESIGN,
ARCHITECTURE AND ENGINEERING SERVICES FOR THE VETERANS PARK REFURBISHMENT AND RESTROOM RENOVATION ("RFP").
Submit a proposal with full understanding and full consideration of this addendum. This addendum is being issued to make the following changes:
A. The proposal submittal due date is hereby changed to Tuesday, September 16, 2025, at 5:00 p.m.
B. A mandatory pre -proposal meeting will be held on Thursday, August 28, 2025, at 2:00 p.m. at Veterans Park, located at 6662 Loveland Street, Bell Gardens, CA 90201. Attendance is mandatory. Prospective proposers must attend this meeting to be eligible to submit a proposal.
C. In the Submittal Procedure/Deadline section, the tentative schedule is hereby revised to read as follows:
Release of RFP
Thursday, July 31, 2025
Mandatory Pre -Proposal Meeting
Thursday, Aucust 28, 2025 at 2:00 p.m.
Proposal Due Date
Tuesday, September 16, 2025 at 5:00 p.m.
Proposer Interviews (if necessary)
Tuesday, September 30, 2025
** Tentative City Council
Recommendation of
Award/Agreement Approval
Monday, October 13, 2025
*The schedule above is tentative and subject to change at the discretion of the City, with appropriate notice to prospective Proposers. Please check the Bell Gardens website for the latest updates at https://www.bellgardens.org/i- want-to/view-bids-rfps/rfps-andbids. All times posted are in pacific standard time (PST).
**Proposer must be available on Monday, October 13, 2025, in -person or virtually for a possible presentation to the City Council. 114 City of Bell Gardens Page 623 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Addendum No. 1
RFP - Design, Architecture and Engineering Services for the Veterans Park Refurbishment and Restroom Renovation
Inform subcontractors and suppliers as necessary.
Sincerely,
Bernardo Iniguez
Director of Public Works/ Facilities
The proposer shall individually identify and acknowledge receipt of this addendum by signing and enclosing a copy of this form in his/her proposal submittal. Failure to do so may result in disqualification of his/her proposal submittal.
Jeff Ferber October 2, 2025
Signature of Proposer Date
RRM Design Group: Main Office: 32332 Camino Capistrano, Ste. 205, San Juan Capistrano, CA 92675 Headquarters: 3765 South Higuera St., Ste. 102, San Luis Obispo, CA 93401 Proposer Firm Name and Address
Appendix Section 7
LL
PUBLIC WORKS DEPARTMENT
8327 GARFIELD AVENUE • BELL GARDENS, CALIFORNIA 90201-6122 (562) 806-7770 FAX (562) 806-7789 • WWW.BELLGARDENS.ORG
REQUEST FOR PROPOSALS FOR DESIGN, ARCHITECTURE AND ENGINEERING
SERVICES FOR THE VETERANS PARK REFURBISHMENT AND RESTROOM
RENOVATION
ADDENDUM NO. 2
September 12, 2025,
This addendum is being issued for the Request For Proposals For Design, Architecture And Engineering Services For The Veterans Park Refurbishment And Restroom Renovation.
Submit a proposal with full understanding and full consideration of this addendum. This addendum is being issued to make the following changes:
A. The proposal submittal due date is hereby changed to Thursday, October 2, 2025, at 5:00 p.m.
B. In the Submittal Procedure/Deadline section, the tentative schedule is hereby revised to read as follows:
Release of RFP
Tuesday, August 12, 2025
Deadline for questions
Thursday, Aucust 14, 2025, at 5:00 p.m.
Mandatory Pre -Proposal Meetinc
Thursday, Aucust 28, 2025 at 2:00 p.m.
Proposal Due Date
Thursday, October 2, 2025 at 5:00 p.m.
Proposer Interviews (if
necessary)
Week of October 13 — 16, 2025
*` Tentative City Council
Recommendation of
Award/Agreement Approval
Monday, October 27, 2025
*The schedule above is tentative and subject to change at the discretion of the City, with appropriate notice to prospective Proposers. Please check the Bell Gardens website for the latest updates at https://www.bellgardens.org/i-want-to/view-bids-rfps/rfps-andbids . All times posted are in pacific standard time (PST).
**Proposer must be available on Monday, October 27, in -person or virtually for a possible presentation to the City Council.
C. Page 11 of the RFP has been replaced with the attached Revised Page 11. 116 city of Bell Gardens Page 625 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation
D. This addendum is being issued to incorporate the following Response to Request for Information No. 1 into the RFP:
RESPONSE TO REQUESTS FOR INFORMATION NO. 1
1. What portion of the total $5.78M funding is allocated specifically for design services?
A: The City has not specified a budget for design services. However, the City anticipates design costs will be approximately 7-12% of the total project budget.
2. Is there a projected construction budget for the project? A: The remaining project budget for the Veterans Park Refurbishment is $3,310,894, of which 80% is anticipated for construction.
3. Has any previous design or master planning work been completed for the park? A: The most recent renovation at Ross Hall took place in 1979 with the addition of the south wing.
4. Are there any drawings, records, etc. of any of the existing park improvements including underground utilities?
A: The most recent as -built plans are from the project that took place in 1979.
The Consultant is expected to perform full field investigation and survey.
Therefore, proposals must reflect both the scope of work and the costs associated with this task.
5. What is the square footage of the area within Ross Hall to be renovated? A: Ross Hall Auditorium is approximately 3,394 SF.
6. What is the year of original construction for the buildings? A: The building's original construction date is unknown at the time. However, the building underwent a renovation in 1979.
7. What types of interior improvements are anticipated (e.g., ADA compliance, lighting, HVAC, plumbing, finishes, structural upgrades)? A: The scope of work is defined by the available budget. Due to the size and conditions of Ross Hall, non-structural improvements may be most appropriate to maximize funding and create a more functional space. Interior improvements at Ross Hall may include finishes (flooring, paint, cabinetry, etc.) and ADA improvements for accessibility.
8. Are there existing drawings available?
A: The most recent as -built plans are from the project that took place in 1979.
Appendix Section 7
Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation
9. Does the City foresee the same usage and programming for the future renovated Ross Hall Recreation Center & Cultural Center or are there new programs they foresee incorporating?
A: Ross Hall will continue with the same programming after the refurbishment project.
10. Is a potential visit to the site to tour the existing building (s) feasible or can we visit without scheduling with the City assuming that the building areas are accessible to the public?
A: Prospective proposers had the opportunity to walk the site during the mandatory pre -proposal meeting held on August 28, 2025, Prospective proposers may also visit the site to view areas normally open to the public,
11. What assumptions should be made regarding structural work (e.g., no structural modifications)?
A: The City does not anticipate the need for any significant structural modifications for this project.
However, should a designer propose any enhancements that affect the building's structural framework, the designer will be responsible for providing a complete set of structural plans and pertinent calculations as part of the project.
12. Does the City have a report available for Ross Hall Recreation Center & Cultural Center regarding the presence of any hazardous materials? Should we include as part of our proposal?
A: The Consultant will be responsible for obtaining any necessary hazardous materials reports. Therefore, proposers must include the costs and tasks associated with these reports as part of their proposal.
13. Is the Senior Center building excluded from the scope of work? A: The scope of this project does not extend to improvements on the Senior Center building.
14.Should the existing restroom be renovated in place, removed and replaced, or relocated elsewhere in the park?
A: The City is considering designs that call for the removal and replacement of the existing restroom. Proposing to relocate the restroom is not necessary.
15. What is the approximate square footage of the existing restroom facility? A: The approximate square footage of the existing outdoor restroom building is 740 square feet, and the adjoining storage building is approximately 615 square feet, for a total of approximately 1,655 square feet,
16. Is the intent to renovate the existing structures, or would a complete replacement be preferred?
118 City of Bell Gardens Page 627 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation
A: The City is considering designs that call for the removal and replacement of the existing restroom.
17. Would a prefabricated building for both structures be acceptable? A: It is the City's preference to replace the restroom with a site -built restroom facility.
18.Are as -built drawings available for these buildings? A: No as-builts are available for the restroom and storage building. The Consultant is expected to perform full field investigation and survey. Therefore, proposals must reflect both the scope of work and the costs associated with thus task.
19. What type of splash pad system is envisioned (recirculating vs. potable -to -drain)? A: The incorporation of the splash pad is currently under review by the State grant agency. Should the splash pad remain in the scope, it would need to be in compliance with current regulations for splash pads.
20. With the new splash pad, there be a need for supporting facilities such as a building for the mechanical room, restrooms, or changing areas with indoor or outdoor showers in which we should account as part of our scope, shall we assume the splash pad will be located near the new restroom and that restroom will have space for all the necessary accoutrements for the splash pad? A: Please note that the incorporation of a splash is currently on -hold and should not be part of the proposal at this time.
21. Which permitting and regulatory agencies will the consultant be expected to coordinate with (e.g., LA County Health, AQMD, Regional Water Quality Control Board)?
A: It is the proposer's responsibility to identify all permitting and regulatory agencies required for their proposed scope. Their submission must take into consideration a plan for all necessary coordination.
22. Will CEQA and/or NEPA documentation be handled by the City, or will it be part of the consultant's scope?
A: The Consultant will be required to handle all CEQA and/or NEPA documentation.
23. Should stormwater treatment/LID assumed to be triggered (via 5,000SF of added or modified impervious area) by this project?
A: Since none of the project components are within the category of a "priority project" under the MS4 NPDES Permit, post -construction stormwater treatment/LID is not anticipated.
24. Has the city already solicited community input or will that be the role of the consultant?
Appendix Section 7
Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation
A: The conceptual scope was developed after the City obtained the public's input in 2019.
25. Are any community meetings needed for the park improvements? A: No community meetings are required at this time. However, the Consultant is expected to lead and coordinate any public hearings, if required by agencies.
26. The RFP states new stadium lighting for the renovated baseball field, will any of the renovated sports courts (Basketball, Volleyball, Tennis or Futsal) need new lighting for night play?
A: Lighting for the basketball, tennis, and futsal courts are expected to be upgraded to energy -efficient and/or LED lighting as part of this project.
27. Baseball field lights, what is the existing system at the field, does the city want to replace the entire baseball field lights and electrical equipment? A: While some lighting upgrades were performed at Veterans Park in 2024, the scope of this project requires the incorporation of additional improvements to all areas that were not addressed in the first phase of the project.
The final scope of these additional lighting improvements will be determined and confirmed with the selected Consultant during the project kick-off stage.
28.Are there existing lights for the basketball court, will lights be needed for the basketball court?
A: Yes, the basketball court will require lighting upgrades.
29.Are there existing lights for the tennis court, will lights be needed for the tennis court?
A: Four tennis court fixtures were completed in 2024. However, the selected Consultant may be required to incorporate additional lighting upgrades.
30.Are there existing lights for the volleyball court, will lights be needed for the volleyball court?
A: While some lighting upgrades were performed at Veterans Park in 2024, the scope of this project requires the incorporation of additional improvements to all areas that were not addressed in the first phase of the project.
The final scope of these additional lighting improvements will be determined and confirmed with the selected Consultant during the project kick-off stage.
31.Are there existing lights for the futsal court, will lights be needed for the futsal court?
A: Yes, the futsal courts will require lighting upgrades.
32. Are there any improvements included to the existing area/walkway lights? 120 City of Bell Gardens Page 629 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation
A: While some lighting upgrades were performed at Veterans Park in 2024, the scope of this project requires the incorporation of additional improvements to all areas that were not addressed in the first phase of the project.
The final scope of these additional lighting improvements will be determined and confirmed with the selected Consultant during the project kick-off stage.
33. New lighting for existing courts? If "yes" replacement of existing light fixtures or new poles and light fixtures?
A: Any new lighting upgrades would need to match the specification of the City - approved pole and fixture design.
34. Is lighting required at shade sails?
A: Shade sails will not require fighting.
35.The RFP mentions a stage and an amphitheater, can you please clarify if only a stage is needed, is a permanent or portable stage preferred? A: The City is looking for a permanent amphitheater.
36. If an amphitheater is needed, is a roof needed, clam style backing or shade structure roof?
A: Preliminary design does not account for a roof or share structure over the amphitheater.
37. What is the intended programing for the stage/amphitheater? A: The amphitheater will serve as the venue/stage to host community events, such as the Fiestas Patrias and the Spring Events.
38.Are lights, electrical plugs, audio/PA system needed for the amphitheater/stage? A: Powers and audio/visual connections will be required.
39. Is existing site main metered electrical service have enough spare capacity of improvements?
A: No, electrical service upgrades are needed,
40. Do they have any electrical as -built drawings?
A: Electrical as built are currently not available.
41. Please confirm whether the project scope outlined on page 11 should take precedence over the scope described on page 3.
A: The scope of work can be found in Section V. Please note the park features list has been revised and included in this Addendum.
42. Can the City provide a site plan to show the anticipated extends of the RFP scope of services with related square footage?
Appendix Section 7
Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation
A: Please refer to the updated map uploaded to the RFP's page on the City's website. Ross Hall is approximately 3,394 SF.
43. Please clarify the exact scope of work for the renovation. Is it limited to finishes? Is there interior and exterior work? Will it include kitchen and bathroom as well? A: This project will focus on a targeted renovation of the auditorium (Ross Hall).
Finishes and Surfaces may include painting, flooring, ceilings. Lighting and Electrical may include LED lighting conversion, stage lighting, adding light fixtures to create visual interest, and lighting control system. Audio/visual elements and accessibility improvements are also anticipated.
44. If kitchen renovations are included, is it a commercial kitchen requiring health department approval?
A: Yes
45. Please clarify the extent and expected deliverables for the "comprehensive survey" including what documents the city will be providing for review versus what will need to be generated by the Consultant team. Please clarify what the expected deliverables are for base mapping and details? A: Deliverables include, but are not limited to, existing conditions plan, utility plans, site plan, architectural floor plans, elevations, hazardous materials report, and accessibility survey.
46.Are there any offsite improvements that are anticipated? A: No offsite improvements, such as sidewalk repairs and driveway aprons, are anticipated.
47. Is the City planning for all new landscaping, or will some areas remain? A: The City does not anticipate renovating the entire park's landscaping.
However, the Consultant will be required to incorporate landscape improvements in specific areas as part of the project.
48. What is the area of the park renovation?
A: The refurbishment project will mainly focus on Ross Hall, and green space areas in the park, Please refer to updated map for more information.
49. We are anticipating a design and consulting team composed of the following entities. Please let us know if there are additional consultants that the City anticipates being required. (Lists Architecture, Landscape, Structural, Mechanical, Electrical and Plumbing, Civil, CEQA, Cost Estimator) A: Consultant will be responsible for assembling the design team as it is entirely dependent upon the proposed scope. Proposers should exercise their professional judgment in identifying and including all necessary services to ensure the successful completion of the project.
122 city of Bell Gardens Page 631 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation
50.Are Cost Proposals to be submitted separately? If so, how many hard copies does the City want?
A: Please refer to Section IL Submittal Procedures/Deadlines for information,
51. Section 1.2 (Scope of Work) of the sample agreement appears to be intended for "As -Needed" services. Can this section be modified to refer specifically to the Veterans Park project scope of services?
A: Please refer to Subsection 6. Additions or Exceptions under Section VI.
Proposal Format and Content Requirements.
Inform subcontractors and suppliers as necessary.
Sincerely,
Bernardo Iniguez
Director of Public Works/ Facilities
The proposer shall individually identify and acknowledge receipt of this addendum by signing and enclosing a copy of this form in his/her proposal submittal. Failure to do so may result in disqualification of his/her proposal submittal. %- I Jeff Ferber October 2, 2025
Signature of Proposer Date
RRM Design Group: Main Office: 32332 Camino Capistrano, Ste. 205, San Juan Capistrano, CA 92675 I Headquarters: 3765 South Higuera St., Ste. 102, San Luis Obispo, CA 93401 Proposer Firm Name and Address
Appendix Section 7
to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the consultant shall complete and submit Standard Form-LLL, "Disclosures Form to Report Lobbying", in accordance with its instructions.
C. The consultant shall require that the language of this certification be included in all subcontracts and that all subcontracts shall certify and disclose accordingly.
V.
SCOPE OF SERVICES!
The primary goal of this RFP is to solicit proposals from qualified consultants who can provide the City with the professional design, architecture and engineering services for the Veterans Park Refurbishment and Restroom Renovation.
Veterans Park Refurbishment and Restroom Renovation
The purpose of the project is to improve the existing infrastructure in the park.
As part of this project, the City has recently installed an outdoor fitness center and new LED lighting. The selected consultant will be responsible for the design of the following features:
• Local resource for regular recreation classes, festivals, and programming. • Shade sail over outdoor exercise equipment
• Improve comfortable seating for visitors.
• Community stage with lawn.
• Park with two passive, therapeutic gardens with signage. • Improved restroom facility (Building will not be relocated) • Park with two picnic areas with flat, smooth table surfaces. • Park with walking trail and mile markers, incorporating the closed road between the hard courts and skate park.
• Add shade structures to two basketball, two tennis, futsal, and volleyball courts. • Add lighting and shade structure to baseball field.
• Improve interior of Ross Hall Recreation Center & Cultural Center. • Improve landscaping
As a separate project, the selected consultant will perform the following:
• Renovation of bathroom building; and
• Renovation of storage building.
The consultant will provide project design services and construction support. The consultant's design staff shall have at least five (5) years of experience of providing design and construction support services to municipalities in California and have performed these services for California municipalities within the past twelve (12) months. Plans, specifications, engineering reports and/or studies must contain a valid registered professional engineer/architect stamp from consultant's staff, who shall be registered professionals in the State of California. The consultant's tasks will include, but are not limited to, the following:
REVISED 11-R
124 city of Bell Gardens Page 633 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
PUBLIC WORKS DEPARTMENT
8327 GARFIELD AVENUE • BELL GARDENS, CALIFORNIA 90201-6122 (562) 806-7770 FAX (562) 806-7789 • WWW.BELLGARDENS.ORG
REQUEST FOR PROPOSALS FOR DESIGN, ARCHITECTURE AND ENGINEERING
SERVICES FOR THE VETERANS PARK REFURBISHMENT AND RESTROOM
RENOVATION
ADDENDUM NO. 3
September 29, 2025
This addendum is being issued for the Request For Proposals For Design, Architecture and Engineering Services for the Veterans Park Refurbishment and Restroom Renovation.
Submit a proposal with full understanding and full consideration of this addendum. This addendum is being issued to make the following changes:
A. This addendum is being issued to incorporate the following Response to Request for Information No. 2 into the RFP:
RESPONSE TO REQUESTS FOR INFORMATION NO. 2
1. Q: The RFP lists the Fee Proposal in the Evaluation Criteria. California State law mandates all state and local agencies apply Qualifications -Based Selection (QBS) procedures when hiring design professionals. Will the City revise the Evaluation Criteria to remove fee from the criteria?
A: Evaluation criteria are primarily quallification-based, with 90 points of the total) available score dedicated to the firm's qualifications, experience, and technical) approach. The Fee Proposal evalluation accounts for onlly 10 points of the total score.
2. Q: Given that the facilities are existing, do you anticipate that the project will be exempt from CEQA?
A: Depending on the proposed scope, proposers should exercise their professional judgment in identifying and including all necessary services to ensure the successful completion of the project.
3. Q: What events are hosted in the park?
A: Ross (Hall offers a space for special events, celebrations or meetings. It is used as the City's event hall, Veterans Park is utilized to host community events, such as the Fiestas Patrias and the Spring Events, The park also serves as the City's cooling center,
Appendix Section 7
Addendum No. 3
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation
4. Q: What recreational tournaments are held in the park? A: Softball tournaments are held at this park. Other sports amenities are open to the public.
5. Q: What are the project limits?
A: The scope of work is defined by the available budget. Please refer to the revised scope of work in Addendum No, 2 for details.
6. Q: Does the City have an arborist on -staff to assist with the project? A: Arboricultural support for the project will be provided on an as -needed basis by the City's contracted tree maintenance service provider.
7. Q: The following link in the RFP is unavailable: ""*The schedule above is tentative and subject to change at the discretion of the City, with appropriate notice to prospective Proposers. Please check the Bell Gardens website for the latest updates at https://www.bellgardens.org/i-want-to/view-bids-rfps/rfps-andbids . All times posted are in pacific standard time (PST).". Can the City provide a working link for latest updates?
A: Please use the following link: https://www.bellgardens.orq/i-want-tolview-bids- rrfps/rfps-and-bids.
8. Q: To confirm our understanding of Section 3 — Minimum Qualifications, Prior Related Experience, and References: If our selected case studies include all the required reference information (Le., project description, time period, client contact details, and key personnel), can these case studies serve as both the demonstration of prior experience and fulfill the reference list requirement? Or is a separate, standalone reference list still required in the appendix, even if the case studies already contain this information?"
A: It is the City's preference to have a separate section for references,
9. Q: Are there any offsite improvements required on the perimeter streets? A: Please see Question 46 in the Response to Requests for information No, 1, included in Addendum No. 2.
10.Q: Can the City provide record drawings for perimeter streets, infrastructure and utilities, and on -site irrigation?
A: Please see Question 4 in the Response to Requests for Information No. 1, included in Addendum No. 2.
11.Q: What are the extents of the renovations of Ross Hall Recreation and Cultural Center?
A: Please see Question 7 in the Response to Requests for Information No. 1, included in Addendum No. 2.
126 City of Bell Gardens Page 635 of 817
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Addendum No. 3
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation
12.Q: What is the budget for the exterior landscape improvements? A: The total cost for these improvements will be defined by the design process and proposed scope.
13.Q: What is the budget for the interior building improvements? A: The total cost for these improvements will be defined by the design process and proposed scope.
14.Q: What portion of the total $5.78M funding is allocated specifically for design services?
A: Please see Question 1 in the Response to Requests for Information No. 1, included in Addendum No. 2.
Inform subcontractors and suppliers as necessary.
Sincerely,
Bernardo Iniguez
Director of Public Works/ Facilities
The proposer shall individually identify and acknowledge receipt of this addendum by signing and enclosing a copy of this form in his/her proposal submittal. Failure to do so may result in disqualification of his/her proposal submittal.
I Jeff Ferber
October 2, 2025
Signature of Proposer Date
RRM Design Group: Main Office: 32332 Camino Capistrano, Ste. 205, San Juan Capistrano, CA 92675 I Headquarters: 3765 South Higuera St., Ste. 102, San Luis Obispo, CA 93401 Proposer Firm Name and Address
Appendix Section 7
rrm
design
group
Creating
Environments
People
Enjoy -
r
r
Exhibit "A" Scope of Services
Sc. e of Services Task tUne:
Task 1: Project Initiation and Feasibility Phase
Subtask 1.01:
Subtask 1.02:
Subtask 1.03:
Subtask 1.04:
Subtask 1.05:
Project Kickoff Meeting & Field Investigation
Background Data Collection & Review
Topographic Survey/Base Mapping
Geotechnical Investigation
CEQA Compliance
Task 2: Design Development Services
Subtask 2.01: Conceptual Design Alternatives
Subtask 2.02: Key Stakeholder Meetings
Subtask 2.03: Final Schematic Plan
Subtask 2.04: 30% Design Development & Phasing Plan
Task 3: Construction Document Services
Subtask 3.01:
Subtask 3.02:
Subtask 3.03:
Subtask 3.04:
Subtask 3.05:
75% Draft Construction Documents
100% Draft Construction Documents
Permit Processing Assistance
Bid -Ready Construction Documents
LID Standard Manual Compliance Report
Task 4: Construction Support Services
Subtask 4.01: Bidding Support
Subtask 4.02: Construction Administration Support
Subtask 4.03: Construction Observation
Subtask 4.04: Record Drawings
Task 5: Project Coordination Services
Subtask 5.01:
Subtask 5.02:
Subtask 5.03:
Project Coordination & Management
Project Development Team Meetings
QA/QC Review
Task 6: Optional Tasks
Subtask 6.01: Utility Mapping/Utility Coordination
I I
etafl Sc e f t rvlices
r r 2 EliVirOn
a
ve e
s
Veterans Park Renovation
Exhibit "A" Scope of Services
Task 1: Project Initiation and Feasibility Phase
Subtask 1.01: Project Kickoff Meeting & Field Investigation RRM will conduct one (1) virtual kickoff meeting attended by the City's project management team, key Parks and Recreation staff, and key RRM team members will attend this meeting. Principally, this meeting will provide an opportunity to discuss and confirm the key park program elements as presented in the RFP and required by the grant.
Following the kickoff meeting, RRM and the project team will be available to walk the project site with City staff to discuss the project further and review it in greater detail. The site walk will provide an opportunity to inspect and photo log the existing facilities, including Ross Hall, amphitheater location, shade sail locations, sports courts, and landscape areas.
Deliverables:
• Prepare for and conduct one (1) virtual kickoff meeting and one (1) site walk • Meeting notes
Subtask 1.02: Background Data and Collection Review
RRM will collect from the city relevant project data for the design effort, including but not limited to:
• Existing improvement drawings for the park and historic structures • Record data
• City GIS databases
• City utility information and plans
• Recreation and event programming plans
• Underground and overhead utility plat maps and data
• Standard City details and specifications
• Sample bid documents (plans and specifications) from recent similar projects RRM's team will review this data for completeness and may request additional information from the City, as necessary, to analyze the project background and establish a database that will play a critical role in assessing all aspects of the park's design.
Deliverables:
• Collect and review relevant data as noted above.
• Compile data in a portable file for use by the Client and design team.
Subtask 1.03: Topographic Survey/Base Mapping
RRM will conduct survey work to create a base map file suitable for conceptual engineering and design work. The topographic survey work will include the following components:
Aerial Photo Control and Coordination
Veterans Park Renovation
Exhibit "A" Scope of Services
RRM will facilitate the coordination of aerial mapping with an aerial photogrammetrist. This task will include establishing horizontal and vertical survey control. Horizontal control will be based on California State Plane Coordinates. The vertical datum will be established from National Geodetic Survey monuments and will be North American Vertical Datum 1988. RRM's surveyors will coordinate with the photogrammetrist to obtain aerial photography suitable for compiling a topographic map at a scale of 1" = 20' showing contours at 0.5 -foot intervals with planimetric features, including detail on roads, structures, fences, power poles, trees, brush, and other aboveground features according to standard practice. The contour information on the aerial mapping will only be visible in the open areas. The areas obstructed by tree cover will not show contour information. Accuracy will equal or exceed national map accuracy standards for large-scale topographic maps compiled by photogrammetric methods. The finished product will be available in a digital format compatible with AutoCAD Civil 3D.
Supplemental Topographic Survey
RRM will perform topographic surveying and mapping to supplement aerial photography. The collected data will be incorporated into a digital base map for use in the design. Topographic spot elevations will be taken to quality control the elevations shown on the aerial mapping. The horizontal and vertical datum will be based on the CCS83 (2011) State Plane Coordinates and NAVD 88 when suitable local agency datum's are unavailable
• Contours at one -foot intervals
• Footprints of existing buildings and other structures • Trees greater than 2" in diameter with trunk diameter (dbh) and canopy • Above ground evidence of utilities, location and invert at accessible storm drain manholes, inlets and sanitary sewer manholes, water valves, fire hydrants, light standards, electric boxes, valve boxes and power poles, including sidewalks, curb, gutter and mow curbs • Other features as required by the design team
Deliverables:
• Digital topographic map file in AutoCAD format.
• Digital Terrain Model
• Color digital orthophotos.
Subtask 1.04: Geotechnical Investigation
RRM's Geotechnical consultant, GPI, will prepare a geotechnical investigation report suitable for support of schematic planning and construction documents for Veterans Park in Bell Gardens. This will include review of readily available background materials and data including published geologic and seismic hazard maps, groundwater data, topographic maps, and geotechnical data. A site reconnaissance will be conducted to document the surficial geological conditions on site and mark proposed locations for clearance by site personnel and Underground Service Alert (USA).
Subsurface exploration will be accomplished through 8 exploratory borings drilled to depths of 10 to 20 feet (5 at 10 feet and 3 at 20 feet) below the existing grade. Two infiltration test wells will also be installed
Veterans Park Renovation
Exhibit "A" Scope of Services
to depths of 5 at locations requested by the Project Civil Engineer. The borings will be drilled with a track - mounted drill rig or hand -auger equipment and will be logged by our Engineer. Relatively undisturbed and bulk samples will be obtained at selected intervals from the borings. The soil samples will be transported to our City of Los Angeles and DSA approved laboratory for testing. The geotechnical evaluation results will be compiled in a report providing findings, conclusions, and geotechnical recommendations for design and construction of improvements.
A geotechnical investigation report will be prepared illustrating the locations of borings, boring logs, and presenting laboratory analysis results. The report will include a general discussion of and geotechnical design recommendations for the structures planned (minor buildings, stage, light standards, retaining walls, fence/pole foundations, hardscape, and pavements). We will also include a conclusion on the suitability of the site for the proposed construction from a geotechnical perspective, description of geology and soils, seismic hazards, mitigations alternatives as appropriate, depth of groundwater, and infiltration rates.
Deliverables:
• Geotechnical Investigation Report
Subtask 1.05: CEQA Compliance
Improvements for Veterans Park would be considered a project under the California Environmental Quality Act (CEQA) and will require appropriate environmental compliance documentation. Article 19 of the CEQA Guidelines provides a list of classes of projects which have been determined not to have a significant effect on the environment and therefore can be exempt from the provisions of CEQA. The scope of work includes improvements in the park mainly to upgrade existing facilities such as the renovation of existing sports courts, and the renovation and relocation of a bathroom building and storage building. Other proposed enhancements include new gardens, picnic areas, a shade sails, lighting improvements, an amphitheater, and refreshed landscaping. Based on these assumptions, the project preliminarily appears to qualify for a Categorical Exemption through several categories including Class 1 (Existing Facilities), Class 2 (Replacement or Reconstruction), Class 4 (Minor Alterations to Land), and Class 23 (Normal Operations of Facilities for Public Gatherings).
RRM proposes to analyze the project for CEQA compliance and anticipates preparation of a Notice of Exemption (NOE) using the standard Notice of Exemption form contained in Appendix E of the CEQA Guidelines with a brief supporting analysis relying on existing available information. No new technical analyses are proposed. Within five days following the approval of park improvements, RRM will post the NOE with the County of Los Angeles County Clerk, and City staff will be responsible for posting the NOE at City facilities. In the event proposed improvements are more substantial and determined to potentially have a significant effect on the environment, RRM would outline needed strategies, and this task and budget would be reviewed and rescoped as needed.
Veterans Park Renovation
Exhibit "A" Scope of Services
Deliverables:
• Review of existing available, relevant documentation
• Notice of Exemption (NOE) completed form with brief supporting analysis Task 2: Design Development Services
Subtask 2.01: Conceptual Design Alternatives
Based on the project data developed in Task 1 and the programming elements important to the city, RRM's team will prepare up to two (2) conceptual design alternatives for Veterans Park to explore various renovation possibilities. The alternatives will illustrate such things as the amphitheater, shade sails, therapeutic gardens, Ross Hall improvements, and other park amenities. The layout of the park will be communicated through color plan graphics to help communicate park's design. The draft alternatives will be presented as color plans, schematic in nature for clarity while allowing for efficient modifications and refinements. The alternatives will be given to RRM's construction cost estimator, OCMI, to provide conceptual level estimates for each plan. RRM will package the draft conceptual design alternatives for City input.
Deliverables:
• Two (2) conceptual design alternatives in plan format. • Supporting imagery boards to help illustrate vision and character. • Two (2) conceptual design cost estimates
Subtask 2.02: Key Stakeholder Meetings
RRM will host virtual individual and group meetings with key stakeholders. The purpose of these meetings is to provide further input and insight into key design amenities and features. Every reasonable effort will be made to meet with stakeholders unable to attend, at a later time, while maintaining the project schedule. City staff will be responsible for identifying and scheduling the stakeholder group. The list of potential stakeholders will be discussed at the project kickoff meeting, but may include City maintenance staff, recreational groups, Suva Intermediate School, Bell Gardens Boys and Girls Club, and neighbors of the project.
Deliverables:
• Three (3) virtual stakeholder meetings held via Microsoft Teams or Zoom • Summarizing memorandum
Subtask 2.O3: Final Schematic Plan
Based on the feedback received from City staff and the key stakeholders, RRM will then update the preferred concept design alternative to the final schematic plan level for City review. The final schematic plan will illustrate the park's refurbishment design and layout aspects as follows:
Recreation Design
Veterans Park Renovation
Exhibit "A" Scope of Services
RRM's will develop an overall site plan focusing on the recreational hardscape features to illustrate the layout, character, and function of the stage and amphitheater, shade sails, court resurfacing, and therapeutic garden spaces. The site plan will also show how the park's new and upgraded aspects with be integrated with elements of the park that will remain. To help illustrate the draft schematic plan and convey the design intent, RRM will prepare a colored and labeled plan view for use in meetings and media posts.
Ross Hall
For Ross Hall, RRM will use the Owner provided existing conditions documents to develop the renovation into a Final Schematic Plan for the multi -use auditorium upgrades, kitchen renovations, and men's and women's restroom renovations. RRM will provide a labeled floor plan and preliminary code analysis.
Construction Cost Pro ection
Based on the draft schematic package, RRM's construction cost estimator will prepare a construction cost projection for all the site elements. The cost projection will be itemized following CSI format with supporting item descriptions and unit costs.
Deliverables:
• One (1) final color rendered and annotated final schematic plan • One (1) Ross Hall labeled final schematic plan
• One (1) Preliminary Code Analysis
• One (1) construction cost projection
Subtask 2.04: 30% Design Development & Phasing Plan
RRM will prepare a draft 30% design development plan that refines the Final Schematic Plan for the park and Ross Hall improvements. The plan will utilize information from the City and data obtained from the topographic survey and will indicate hardscape layout, site furnishings, shade structures and sails, court resurfacing, planting areas, lighting locations, stormwater BMPs, irrigation hydrozones, and the irrigation mainline location. For Ross Hall, expanding from the final schematic, the 30% Design Development Plan will include a Ross Hall demolition plan, floor plan, interior finish plan, interior elevations, and a materials board. The plan will be used to develop one (1) preliminary cost estimate and to confirm the improvements. Additionally, RRM will provide one (1) phasing plan for discussions with the city about future construction of the improvements.
Deliverables:
• 30% Draft Design Development Plan Set:
o One (1) Labeled Layout Plan
o One (1) Conceptual Planting Plan and Plant Palette
o One (1) Irrigation Hydrozone & Mainline Layout Plan
o One (1) Park Materials Board
o One (1) Ross Hall Demolition Plan
o One (1) Ross Hall Floor Plan
o One (1) Ross Hall Interior Finish Plan
Veterans Park Renovation
Exhibit "A" Scope of Services
o One (1) Ross Hall Interior Elevations Sheet
o One (1) Ross Hall Interior Materials Board
• One (1) phasing plan
• One (1) construction cost projection
Task 3: Construction Document Services
Subtask 3.01: 75% Draft Construction Documents
RRM's team will prepare 75% Construction Documents that address plan check comments generated from the City's review of the 30% Design Development submittal. Prior to submitting to the City, comments generated from RRM's QA/QC review team will be incorporated into the 75% construction document package. The 75% Construction Documents will be submitted to the City's Project Manager for distribution and plan -check.
Deliverables:
• One (1) PDF file 75% Draft Construction Document package • One (1) construction cost opinion
• 30% response to comments memo
Subtask 3.02:100% Draft Construction Documents
RRM's team will prepare 100% Construction Documents that address plan check comments generated from the City's review of the 75% Construction Document submittal. The 100% Construction Documents will be submitted to the City's Project Manager for distribution and backcheck.
Deliverables:
• One (1) PDF file 100% Construction Document package
• One (1) construction cost opinion
• 75% response to comments memo
Subtask 3.04: Permit Processing Assistance
RRM's team will work with the City project management team to process the improvement plans through the City's departments for plan check and permitting. The City will review and compile all agency comments into one set of comments for RRM to respond to. It is assumed that the City will resolve any conflicting comments prior to submitting to RRM. This scope assumes the following City permits will be required:
• Building and Safety Permit — Community Development Department • LA County Department of Public Health
• Golden/ Liberty Water District
• LA Fire Department
• Air Quality Management District
• Sanitation District
• LA County Waste Management
Veterans Park Renovation
Exhibit "A" Scope of Services
Deliverables:
• Prepare one (1) design package and submit to seven (7) permitting agencies with one (1) round of response to comments per agency
Subtask 3.05: Bid -Ready Construction Documents
RRM's team will prepare the Bid -Ready Construction Documents to address any backcheck comments generated from the City's review of the 100% Construction Document submittal. Once the final revisions are complete, one (1) signed reproducible Bid -Ready set of Construction Documents will be submitted to the City's Project Manager for final City/agency signatures and bidding.
Deliverables:
• One (1) signed reproducible Bid -Ready Construction Document package Subtask 3.06: LID Standard Manual Compliance Report
RRM will prepare a LID Standards Manual Compliance Report based on Los Angeles County's 2014 LID Standards Manual. The LID report will be developed to take advantage of any proposed site improvements to utilize low impact techniques to provide water quality treatment. Where possible, source control techniques will be proposed, low maintenance and simple solutions will be sought over proprietary BMP when possible. The LID report will be submitted to the city for review. It will quantify and describe the Post Construction BMPs to be used in the project. Based on the City's comments, RRM will revise the LID Report.
A project plan will be included, illustrating the project site, Drainage Management Areas (DMA's), and the location of BMPs. Operations and maintenance procedures will be defined.
Deliverables:
• One (1) draft LID report
• One (1) final LID report
Task 4: Construction Support Services
Subtask 4.01: Bidding Support
RRM will assist the City during the bidding phase of the project. RRM will attend one (1) pre -bid conference job walk, respond to Requests for Clarifications (RFC) as determined by the City to be reasonable or necessary for the bidding process. Bidder questions will be received and sorted by the City, with applicable questions forwarded in writing to RRM's team for response back to the City in writing.
Deliverables:
• Prepare for and attend one (1) pre -bid conference job walk • Plan clarification response documents
Subtask 4.02: Construction Administration Support
RRM's team will support the City during the anticipated 365 -calendar day (12 -month) construction duration. RRM will attend one pre -construction conference and review and respond to Requests for
Veterans Park Renovation
Exhibit "A" Scope of Services
Information (RFI), Change Orders (CO), submittals, and contractor -supplied shop drawings. Under this task, RRM will also prepare and issue Supplemental Instructions as necessary to clarify design intent. RRM will also coordinate with City staff as necessary. We assume the City's project manager will filter and respond to straightforward RFIs directly to the contractor.
Deliverables:
• Prepare for and attend one (1) pre -construction conference • RFI, CO, submittal reviews, shop drawings responses, supplemental instructions, and general record -keeping documents
Subtask 4.03: Construction Meetings and Observation
RRM's Project Manager will prepare for and attend up to seven (7) field observation meetings throughout the anticipated 365 -calendar day (12 month) construction period to observe construction progress.
These site visits and observations are not intended to be an exhaustive check or a detailed inspection of the Contractor's work, but rather are to allow RRM to become generally familiar with the work in progress and to determine, in general, if the work is proceeding in accordance with the contract documents. RRM's design team shall not supervise, direct, or have control over the Contractor's work, nor have any responsibility for the construction means, methods, techniques, sequences, or procedures selected by the Contractor, nor for the Contractor's safety precautions or programs in connection with the work. These rights and responsibilities are solely those of the Contractor in accordance with the contract documents.
Furthermore, the Contractor shall be responsible for notifying RRM in a timely manner to schedule these field observation meetings. RRM's team shall not be responsible for any acts or omissions of the Contractor, Subcontractor, any entity performing any portion of the work, or any agents or employees of any of them.
RRM does not guarantee the performance of the contractor and shall not be responsible for the Contractor's failure to perform work in accordance with the contract documents or any applicable laws, codes, rules, or regulations. Due to the indeterminate nature of the construction observation requests, this task includes budget for meeting quantity stated above. If more construction observation requests are received, they are to be authorized by the City as additional work.
Deliverables:
• Prepare for and attend seven (7) construction observation meetings (final observation to include a preliminary punch list)
• Field notes and photo documentation
Subtask 4.04: Record Drawings
Upon completion of construction work, RRM will compile and deliver to the City a reproducible set of record drawings based upon the marked -up as -built drawings, addenda, change orders, and other data furnished by the Contractor. These record drawings will show significant changes made during construction. RRM will provide record drawings in PDF format. Revised CAD drawings are excluded from this exercise. Because these record drawings are based on unverified information provided by a third -party, which RRM shall
Veterans Park Renovation
Exhibit "A" Scope of Services
assume will be reliable, RRM cannot and does not warrant their accuracy. RRM will develop a "composite utility map" PDF markup of all utilities for the City's reference and convenience.
Deliverables:
• One (1) reproducible PDF set of record drawings based on contractor provided as-builts Task 5: Project Coordination Services
Subtask 5.01: Project Coordination and Management
RRM's project manager will coordinate with City and design staff, utility companies, resource agencies, sub - consultants, and other agencies as necessary on an on -going basis throughout the project's lifecycle. This task also includes project schedule creation and maintenance as tasks are completed, document review, and day-to-day project coordination efforts including general correspondence and telephone conferencing as required to support City staff during the Project's development.
Deliverables:
• Memos, meeting minutes, and general correspondence for document control, compiled in electronic file form
• Project schedule creation and maintenance
Subtask 5.02: Project Development Team (PDT) Meetings
RRM's project manager, and appropriate team member(s) as the subject matter dictates, will prepare for and attend up to eight (8) virtual PDT meetings with the Client team through the duration of the project.
These meetings will provide an opportunity to collectively review, discuss, and clarify any design issues so that work may proceed in an efficient manner, and to plan out the community meetings.
Deliverables:
• Prepare for and facilitate up to eight (8) virtual PDT meetings • Prepare and distribute meeting notes
Subtask 5.03: QA/QC Review
At the 75% and 100% construction document milestones, RRM will conduct an internal QA/QC review.
RRM assigns an in-house QA/QC manager who is not a part of the design team. Using RRM's QA/QC checklist, a QA/QC team that is not part of the design team will review the project to ensure disciplines are fully coordinated, key information is included, references point to the correct location, and specifications tied into the drawings. This review, and corrective measures, will occur prior to each package (75% & 100%) being submitted to the City.
Deliverables:
• QA/QC review comments incorporated into the 75% Draft Construction Document package • QA/QC review comments incorporated into the 100% Draft Construction Document package
Veterans Park Renovation
Exhibit "A" Scope of Services
Task 6: Optional Tasks
Subtask 6.01: Utility Mapping/Utility Coordination
RRM's utility consultant, Certerra Subsurface — Cbelow, will conduct a comprehensive utility investigation of Veteran's Park to determine all utilities that run through the park. Certerra will exhaust all utility locating methods to identify the horizontal and vertical locations of utility lines, including reviewing existing as -built mapping and on -site reconnaissance field walk. Equipment used during the investigation will include electromagnetic locator, locatable CCTV push camera, ground penetrating radar, locatable duct rodder, crawler camera and lateral launch equipment. Certerra will provide utility locations along with depth estimates in the field.
Once the data has been collected, Certerra will provide a comprehensive two-dimensional utility map in AutoCAD and PDF to be added to the base map.
Deliverables:
• Utility location markers and depth estimates on the park site • AutoCAD and PDF file of utility locations
Ile Assumptions
• Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing water pressure is adequate.
• EV charging station design is not required.
• Natural gas is not required for the design.
• RRM can coordinate with the City -contracted arborist regarding work adjacent to large existing trees V. Client Responsibilities
• City will provide access to all areas for the site assessment visit. This includes access to mechanical, plumbing, and electrical equipment.
• One contact person who will serve as the City's representative and will consolidate all Agency review comments for each submittal milestone into one (1) list of official comments to which RRM can respond • City will provide list of project stakeholders and scheduled times for meetings • City will coordinate building department review and agency compliance at 90% CD Submittal • Document distribution for technical reviews, bidding, and construction • City will provide bid and contract "boilerplate" documents, such as invitation, instructions, general and special conditions, contract forms, insurance, forms, etc. • City will commission a Landscape Irrigation Audit Report, performed by a third -party professional separate from RRM, in accordance with the State's Model Water Efficient Landscape Ordinance. • City will provide title reports for the park property. • City will provide record drawings for analysis for the building and site, including MEP systems.
Veterans Park Renovation
Exhibit "A" Scope of Services
V. Limitations of Scope a 1d Exclusions
Please note that the tasks to be performed by the RRM team are limited to those outlined above. This scope of services excludes the following:
• Independent verification of the accuracy of City provided information • Public outreach
• Presentations to City Council
• Independent verification of accuracy of City -provided information • Green building programs (e.g. LEED, Sites, Greenpoint) • Preparation of the SWPPP and SMARTS registration (Contractor's responsibility). • Arborist Report
• Environmental, Cultural, and Biological services
• Irrigation system audit
• Off -site utility analysis
• Repair to utilities encountered during geotechnical investigations not marked by Underground Service Alert (USA) or shown on plans provided by the City.
• Payment of fees (e.g., title report, permit, processing, noticing, plan check, etc.) • Design of specialized foundation/structural systems other than conventional slab on grade and spread footings
• Easement/dedication/annexation exhibits
• Fagade renovations for the buildings on -site
• Interior building renovations for buildings other than Ross Hall • Lighting improvements for baseball fields, volleyball courts, and memorial • Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing infrastructure for plumbing systems and water pressure is adequate and revisions are not required.
• Splash pad design, mechanical heating and A/C system, Fire alarm, telecommunication, solar panel, security system, and electric vehicle charging system and infrastructure design and coordination is not included as a part of this scope, but can be provided as an additional service. • Value Engineering (mechanical, plumbing and electrical services) • Preparation of separate bid packages and alternates (mechanical, plumbing, and electrical services) • Work associated with systems or components outside the work area is not included except if the system serves the area of work.
Any additional services that RRM Design Group is asked to perform over and above the tasks described above will be subject to a subsequent contract amendment.
Vl. CONSTRUCTION DOCUMENT PACKAGE CONTENTS
Title and Reference Sheets
Veterans Park Renovation
Exhibit "A" Scope of Services
RRM's team will prepare title sheets, as necessary, to convey pertinent general project information.
These sheets may include the project name, location, approval blocks, agency contact information, USA alert, basis of survey statement, list of abbreviations, and bid alternate instructions.
Demolition Plans
RRM's team will prepare demolition plans, at an appropriate scale, for structures and elements requiring removal to implement the park's design. The plans will locate, identify, and describe the removal items and provide instructions for the safe disposal of the demolished work. Additionally, the plans will indicate items to salvage or stockpile such as topsoil for later use in the planting area construction.
Erosion Control Plan
RRM's team will prepare Erosion Control Plans for the site depicting proposed construction BMP in conformance with the State Construction General Permit. The plans will include plan views with locations of proposed BMP, and details of the BMP.
Construction Keynote Plans
RRM's team will prepare construction keynote plans, at an appropriate scale, for the approved design.
The plans will present the overall park design layout with a keynoting system that identifies construction items, references to appropriate details, and drawing series directions.
Site Construction Details
As a companion to the construction plans, we will prepare details for the construction items illustrated on the site construction plans. The details will specify materials, dimensions, colors, and finishes.
Horizontal Control Plans
RRM will prepare horizontal control plans, at an appropriate scale, for the approved design. The plans will establish all horizontal control for the Project. The plans will also establish construction layout control points and establish a coordinate system for locating all site elements.
Grading and Drainage Plans
RRM's team will prepare grading and drainage plans, at an appropriate scale, for the approved design based on the topographic survey. The plans will build on the boundary and topographic information and will show all vertical control of the project elements, contour grading, spot elevations, and cut and fill estimates within the project site. The plans will detail drainage facilities within the park development area with supporting calculations performed for the sizing of new on -site pipes and inlets as outlined in the above task.
Site Utilities
RRM will prepare plan construction documents for domestic water service, fire water and sanitary sewer, storm drains (e.g., "wet" utilities) contained within the property, and connection to the main infrastructure as applicable. Water, sewer, and storm drain plans will include vertical and horizontal design information. RRM assumes adequate service and capacity for the wet utilities. Electrical and gas are not included in this plan sheet (see site electrical below).
Veterans Park Renovation
Exhibit "A" Scope of Services
Ross Hall Plans and Details
RRM's architecture team will provide architecture plans, fixture and materials schedules, and details, at an appropriate scale for the renovation of the kitchen, auditorium and stage support rooms, and restrooms for Ross Hall. Improvements in these areas within Ross Hall will be brought to current accessible design standards.
Mechanical Plans and Details
RRM's team will prepare mechanical plans that show airflow calculations and drawings for the renovated Ross Hall which include new exhaust hood and fans in the kitchen and restrooms. Mechanical details and equipment will be included. Existing building systems will be integrated into existing control systems if available.
Plumbing Plans and Details
RRM's team will verify the adequacy of existing systems using plumbing load calculations for domestic water and waste. Drawings will provide ADA compliant fixture and equipment selections, plumbing renovation plans with fixture locations, and sewer and vent connections, and riser diagrams with associated fixture unit valves for water and waste. Plumbing details and schedules will also be included.
Site Electrical Plans and Details
RRM's subconsultant, P2S, will prepare site electrical plans using documented electrical equipment and services, develop electrical distribution system and prepare electrical single -line diagrams. The plans will include the following upgrades for Ross Hall: LED lighting, occupancy sensors, outlets, power and furnish electric stove, oven, hood, microwave, commercial grade refrigerator and freezer, ice maker, food warmer, dedicated circuits, exhaust fans, and power for mechanical equipment. For the exterior park improvements, P2S will provide outlets at the stage, the irrigation controller, and LED lighting at the sports courts.
Electric and gas utility trench locations will be shown schematically based on coordination with a specialty sub -consultant and/or utility service provider. The plans shall be subject to final utility company handout drawings (prepared by others as deferred submittals). We assume adequate service for this project is available directly adjacent to the project frontage.
Irrigation Plans and Details
RRM will prepare irrigation plans, calculations and document package for planting areas in compliance with the State's Model Water Efficient Landscape Ordinance MWELO. The plans will detail such things as the irrigation system layout, main line, automatic weather sensing controller, head layout, piping, filter, and backflow device. In support of the irrigation plans, we will prepare irrigation details that specify the method of construction and proper irrigation system component procedures. Water use calculations will be provided in accordance with MWELO standards.
Planting Plans and Details
Veterans Park Renovation
Exhibit "A" Scope of Services
RRM's team will prepare planting plans for planting areas. The plans will show the layout of planting indicating plant species, quantity, size and location of all shrubs, ground cover and trees. The plans will indicate anticipated water use for each plant material and separate the planting areas into distinct hydrozone areas for efficient watering. In support of the planting plans, we will prepare planting details that specify the method of construction and proper planting procedures.
Specifications
RRM's team will prepare technical specifications (CSI Division 02 through 48 as applicable). This scope assumes the City will prepare all Division 00 and 01 general provision specification sections related to this project and assemble the specifications book.
Construction Cost Opinions
RRM's construction cost estimator will estimate construction costs at the 65%, 90% and 100% submittal levels. The detailed Construction Cost Opinion will be itemized with supporting item descriptions and unit costs. Due to many variables surrounding bidding and construction conditions, this opinion will not represent a guarantee that bids received, or actual costs of construction will be equal to the opinion.
r
r
Exhibit "B" Compensation
m COICOIT1 ns t n: ar r ve tints
Task 1: Project Initiation and Feasibility
Subtask 1.01:
Subtask 1.02:
Subtask 1.03:
Subtask 1.04:
Subtask 1.05:
Project Kickoff Meeting & Field Investigation
Background Data Collection & Review
Topographic Survey/Base Mapping
Geotechnical Investigation
CEQA Compliance
Task 2: Design Development Services
Subtask 2.01:
Subtask 2.02:
Subtask 2.03:
Subtask 2.04:
Conceptual Design Alternatives
Key Stakeholder Meetings
Final Schematic Plan
30% Design Development & Phasing Plan
Task 3: Construction Document Services
Subtask 3.01:
Subtask 3.02:
Subtask 3.03:
Subtask 3.04:
Subtask 3.05:
75% Draft Construction Documents
100% Draft Construction Documents
Permit Processing Assistance
Bid -Ready Construction Documents
LID Standard Manual Compliance Report
Task 4: Construction Support Services
Subtask 4.01:
Subtask 4.02:
Subtask 4.03:
Subtask 4.04:
Bidding Support
Construction Administration Support
Construction Observation
Record Drawings
Task 5: Project Coordination Services
Subtask 5.01: Project Coordination & Management
Subtask 5.02: Project Development Team Meetings
Subtask 5.03: QA/QC Review
Total Design Services
Estimated Reimbursable Expenses (see note 3)
Fixed Fee: $ 14,440
Fixed Fee: $ 3,425
Fixed Fee:$ 24,900
Fixed Fee:$ 21,525
Fixed Fee:$ 7,460
Fixed Fee: $ 9,343
Fixed Fee: $ 3,650
Fixed Fee: $ 27,596
Fixed Fee: $ 46,510
Fixed Fee: $ 179,035
Fixed Fee: $ 76,729
Fixed Fee: $ 4,600
Fixed Fee: $ 24,153
Fixed Fee: $ 18,440
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
17,161
64,340
16,920
11,134
11,200
7,190
13,720
Fixed Fee: $ 603,471
T&M NTE: $ 2,000
Notes:
1. Fixed Fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced.
real. H1 clErro
Veterans Park Renovation
Exhibit "B" Compensation
2.Not-to-Exceed (NTE) fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced.
3.Reimbursable expenses include such things as document reproduction, plotting services, public meeting materials, company car mileage (current federal rate), lodging, travel, rental car, per diem for survey crew, and overnight delivery. Reimbursable expenses will be billed as incurred at cost plus 10%.
4.RRM may adjust any individual line -item amount within the total overall budget amount shown, with written approval of the City.
5. RRM reserves the right to adjust hourly rates on an annual basis.
Exhibit "A" Scope of Services
C e of ervVices T s
prove es
Task 1: Design Development Services
Subtask 1.01:
Subtask 1.02:
Subtask 1.03:
Subtask 1.04:
in :: estrocc
Preliminary Layout Plan & Client Confirmation Meeting
Draft Schematic Design Package
50% Design Development Package
100% Design Development Package
Task 2: Construction Document Services
Subtask 2.01:
Subtask 2.02:
Subtask 2.03:
Subtask 2.04:
75% Draft Construction Documents Package
100% Draft Construction Documents Package
Permit Processing Assistance
Bid -Ready Construction Documents Package
Task 3: Construction Support Services
Subtask 3.01: Bidding Support
Subtask 3.02: Construction Administration Support
Subtask 3.03: Construction Observation
Subtask 3.04: Record Drawings
Task 4: Project Coordination Services
Subtask 4.01:
Subtask 4.02:
Subtask 4.03:
Project Coordination & Management
Project Development Team Meetings
QA/QC Review
. Deta'fle c pie fi vices
Task 1: Design Development Services
Subtask 1.01: Preliminary Layout Plan & Client Confirmation Meeting RRM will develop one (1) preliminary layout plan of the park restroom and storage facility building based on the City's requirements for the building. This plan will be drafted and labeled. This plan will then be refined in virtual consultation with City Staff at a confirmation meeting.
Deliverables:
• One (1) park restroom and storage facility preliminary layout plan rrf l EEG1 rO-'f
Veterans Park Restroom Renovation
Exhibit "A" Scope of Services
Subtask 1.02: Draft Schematic Design Package
RRM will develop a draft schematic plan prepared at a level for presentation to the City staff. The draft schematic plan will include one (1) floor plan layout based on the program confirmation meeting results.
Based on the final floor plan layout, up to two (2) interior elevations, up to two (2) building sections, and four (4) exterior elevations will be developed showing materials, roof profiles, building style, and colors for the restroom and storage building. Based on the schematic design package, RRM's construction cost estimator will prepare a preliminary order of magnitude construction cost projection for preferred design.
Additionally, RRM will work with the City to develop two (2) exterior perspective model views of the restroom and storage facility. Additionally, RRM will provide one (1) exterior colored elevation.
Deliverables:
• One (1) park restroom and storage building floor plan • Two (2) interior elevations
• Two (2) building sections
• Four (4) exterior elevations (one in each cardinal direction) • One (1) preliminary construction cost opinion
• Two (2) exterior perspective model views
Subtask 1.04: 50% Design Development Package
RRM will prepare a draft 50% design development plan that refines and polishes the design elements detailed in the Draft Schematic Plan for Veterans Park Restroom and Storage Facility building. The plan will utilize information from the City and will indicate demolition plan, floor plan, interior and exterior finish plan, interior and exterior elevations, and a materials board. The plan will be used to develop one (1) preliminary design development cost estimate.
Deliverables:
• 50% Draft Design Development Plan Set:
o One (1) Demolition Plan
o One (1) Floor Plan
o One (1) Interior Finish Plan
o One (1) Exterior Finish Plan
o One (1) Interior Elevations Sheet
o One (1) Exterior Elevations Sheet
o One (1) Interior Materials Board
• One (1) construction cost projection
Subtask 1.05:100 % Design Development Package
Building on the draft 50% Design Development Package, RRM will revise the drawings to a draft 100% Design Development Package level, appropriate for submittal to City agencies. The revised package will be used to update the cost estimate and to confirm the improvements.
Veterans Park Restroom Renovation
Exhibit "A" Scope of Services
Deliverables:
• 100% Draft Design Development Plan Set:
o One (1) Demolition Plan
o One (1) Floor Plan
o One (1) Preliminary Structural Plan Layout
o One (1) Interior Finish Plan
o One (1) Exterior Finish Plan
o One (1) Interior Elevations Sheet
o One (1) Exterior Elevations Sheet
o One (1) Interior Materials Board
• One (1) construction cost projection
Task 2: Construction Document Services
Subtask 2.01: 75% Draft Construction Documents Package
RRM's team will prepare 75% Construction Documents that address plan check comments generated from the City's review of the 100% Design Development submittal. The 75% Construction Documents will be submitted to the City's Project Manager for distribution and plan -check.
Deliverables:
• One (1) PDF file 75% Draft Construction Document package • One (1) construction cost opinion
• 100% DD response to comments memo
Subtask 2.02: 100% Draft Construction Documents Package RRM's team will prepare 100% Construction Documents that address plan check comments generated from the City's review of the 75% Construction Document submittal. Prior to submitting to the City, comments generated from RRM's QA/QC review team will be incorporated into the 100% construction document package. The 100% Construction Documents will be submitted to the City's Project Manager for distribution and backcheck.
Deliverables:
• One (1) PDF file 100% Construction Document package
• One (1) construction cost opinion
• 75% response to comments memo
Subtask 2.03: Permit Processing Assistance
RRM's team will work with the City project management team to process the improvement plans through the City's departments for plan check and permitting. The City will review and compile all agency comments into one set of comments for RRM to respond to. It is assumed that the City will resolve any conflicting comments prior to submitting to RRM. This scope assumes the following City permits will be required:
Veterans Park Restroom Renovation
Exhibit "A" Scope of Services
• Building and Safety Permit —Community Development Department • LA County Department of Public Health
• Golden/ Liberty Water District
• LA Fire Department
• Air Quality Management District
• Sanitation District
• LA County Waste Management
Deliverables:
• Prepare one (1) design package and submit to seven (7) permitting agencies with one (1) round of response to comments per agency
Subtask 2.04: Bid -Ready Construction Documents Package RRM's team will prepare the Bid -Ready Construction Documents to address any backcheck comments generated from the City's review of the 100% Construction Document submittal. Once the final revisions are complete, one (1) signed reproducible Bid -Ready set of Construction Documents will be submitted to the City's Project Manager for final City/agency signatures and bidding.
Deliverables:
• One (1) signed reproducible Bid -Ready Construction Document package Task 3: Construction Support Seir6ces
Subtask 3.01: Bidding Support
RRM will assist the City during the bidding phase of the project. RRM will attend one (1) pre -bid conference job walk, respond to Requests for Clarifications (RFC) as determined by the City to be reasonable or necessary for the bidding process. Bidder questions will be received and sorted by the City, with applicable questions forwarded in writing to RRM's team for response back to the City in writing.
Deliverables:
• Prepare for and attend one (1) pre -bid conference job walk • Plan clarification response documents
Subtask 3.02: Construction Support
RRM's team will support the City during the anticipated 180 -calendar day (6 -month) construction period construction process. RRM will attend one pre -construction conference and review and respond to Requests for Information (RFI), Change Orders (CO), submittals, and contractor -supplied shop drawings and rough grading survey. Under this task, RRM will also prepare and issue Supplemental Instructions as necessary to clarify technical details and prepare preliminary and final punch lists. RRM will also coordinate with City staff as necessary. We assume the City's project manager will filter and respond to straightforward RFIs directly to the contractor.
Veterans Park Restroom Renovation
Exhibit "A" Scope of Services
Deliverables:
• Prepare for and attend one (1) pre -construction conference • RFI, CO, submittal reviews, shop drawings responses, supplemental instructions, and general record -keeping documents
Subtask 3.O3: Construction Observation
RRM's Project Architect will prepare for and attend up to seven (7) field observation meetings throughout the anticipated 180 -calendar day (6 -month) construction period to observe construction progress.
These site visits and observations are not intended to be an exhaustive check or a detailed inspection of the Contractor's work, but rather are to allow RRM to become generally familiar with the work in progress and to determine, in general, if the work is proceeding in accordance with the contract documents. RRM's design team shall not supervise, direct, or have control over the Contractor's work, nor have any responsibility for the construction means, methods, techniques, sequences, or procedures selected by the Contractor, nor for the Contractor's safety precautions or programs in connection with the work. These rights and responsibilities are solely those of the Contractor in accordance with the contract documents.
Furthermore, the Contractor shall be responsible for notifying RRM in a timely manner to schedule these field observation meetings. RRM's team shall not be responsible for any acts or omissions of the Contractor, Subcontractor, any entity performing any portion of the work, or any agents or employees of any of them.
RRM does not guarantee the performance of the contractor and shall not be responsible for the Contractor's failure to perform work in accordance with the contract documents or any applicable laws, codes, rules, or regulations. Due to the indeterminate nature of the construction observation requests, this task includes budget for meeting quantity stated above. If more construction observation requests are received, they are to be authorized by the City as additional work.
Deliverables:
• Prepare for and attend seven (7) construction observation meetings (final observation to include a preliminary punch list)
• Field notes and photo documentation
Subtask 3.04: Record Drawings
Upon completion of construction work, RRM will compile and deliver to the City a reproducible set of record drawings based upon the marked -up as -built drawings, addenda, change orders, and other data furnished by the Contractor. These record drawings will show significant changes made during construction. RRM will provide record drawings in PDF format. Revised CAD drawings are excluded from this exercise. Because these record drawings are based on unverified information provided by a third -party, which RRM shall assume will be reliable, RRM cannot and does not warrant their accuracy. RRM will develop a "composite utility map" PDF markup of all utilities for the City's reference and convenience.
Deliverables:
• One (1) reproducible PDF set of record drawings based on contractor provided as-builts
Veterans Park Restroom Renovation
Exhibit "A" Scope of Services
Task 4: Project Coordination Services
Subtask 4.01: Project Coordination and Management
RRM's project manager will coordinate with City and design staff, utility companies, resource agencies, sub - consultants, and other agencies as necessary on an on -going basis throughout the project's lifecycle. This task also includes project schedule creation and maintenance as tasks are completed, document review, and day-to-day project coordination efforts including general correspondence and telephone conferencing as required to support City staff during the Project's development.
Deliverables:
• Memos, meeting minutes, and general correspondence for document control, compiled in electronic file form
• Project schedule creation and maintenance
Subtask 4.02: Project Development Team (PDT) Meetings
RRM's project manager, and appropriate team member(s) as the subject matter dictates, will prepare for and attend up to eight (8) virtual PDT meetings with the Client team through the duration of the project.
These meetings will provide an opportunity to collectively review, discuss, and clarify any design issues so that work may proceed in an efficient manner, and to plan out the community meetings.
Deliverables:
• Prepare for and facilitate up to eight (8) virtual PDT meetings • Prepare and distribute meeting notes
Subtask 4.03: QA/QC Review
At the 100% construction document milestone, RRM will conduct an internal QA/QC review. RRM assigns an in-house QA/QC manager who is not a part of the design team. Using RRM's QA/QC checklist, a QA/QC team that is not part of the design team will review the project to ensure disciplines are fully coordinated, key information is included, references point to the correct location, and specifications tied into the drawings. This review, and corrective measures, will occur prior to the 100% package being submitted to the City.
Deliverables:
• QA/QC review comments incorporated into the 100% Draft Construction Document package Assumptions
• Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing water pressure is adequate.
• Natural gas is not required for the design.
Veterans Park Restroom Renovation
Exhibit "A" Scope of Services
Client Responsibilities
• City will provide access to all areas for the site assessment visit. This includes access to mechanical, plumbing, and electrical equipment.
• One contact person who will serve as the City's representative and will consolidate all Agency review comments for each submittal milestone into one (1) list of official comments to which RRM can respond • Document distribution for technical reviews, bidding, and construction • City will coordinate building department review and agency compliance at 90% CD Submittal • City will provide bid and contract "boilerplate" documents, such as invitation, instructions, general and special conditions, contract forms, insurance, forms, etc. • City will commission a Landscape Irrigation Audit Report, performed by a third -party professional separate from RRM, in accordance with the State's Model Water Efficient Landscape Ordinance. • City will provide title reports for the park property. • City will provide record drawings for analysis for the building and site, including MEP systems.
V. Limitations of Scope and Exclusions
Please note that the tasks to be performed by the RRM team are limited to those outlined above. This scope of services excludes the following:
• Independent verification of the accuracy of City provided information • Public outreach workshop and strategy
• Presentations to City Council
• Independent verification of accuracy of City -provided information • LEED/Sites/Greenpoint documentation and design
• Preparation of the SWPPP and SMARTS registration (Contractor's responsibility). • Utility analysis
• Geotechnical engineering
• Payment of fees (e.g., title report, permit, processing, noticing, plan check, etc.) • Design of specialized foundation/structural systems other than conventional slab on grade and spread footings
• Easement/dedication/annexation exhibits
• Fagade renovations for the buildings on -site
• Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing infrastructure for plumbing systems is adequate and revisions are not required. • Existing water pressure is adequate.
• A/V, solar panel, telecommunication, security systems, fire alarm, mechanical heating and a/c System Design is not included as a part of this scope, but can be provided as an additional service. • Value Engineering (mechanical, plumbing and electrical services) • Preparation of separate bid packages and alternates (mechanical, plumbing, and electrical services) • Work associated with systems or components outside the work area is not included except if the system serves the area of work.
Veterans Park Restroom Renovation
Exhibit "A" Scope of Services
Any additional services that RRM Design Group is asked to perform over and above the tasks described above will be subject to a subsequent contract amendment.
VI. CONSTRUCTION DOCUMENT PACKAGE CONTENTS
Title and Reference Sheets
RRM's team will prepare title sheets, as necessary, to convey pertinent general project information.
These sheets may include the project name, location, approval blocks, agency contact information, USA alert, basis of survey statement, list of abbreviations, and bid alternate instructions.
Demolition Plans
RRM's team will prepare demolition plans, at an appropriate scale, for structures and elements requiring removal to implement the park's design. The plans will locate, identify, and describe the removal items and provide instructions for the safe disposal of the demolished work. Additionally, the plans will indicate items to salvage or stockpile such as topsoil for later use in the planting area construction.
Erosion Control Plan
RRM's team will prepare Erosion Control Plans for the site depicting proposed construction BMP in conformance with the State Construction General Permit. The plans will include plan views with locations of proposed BMP, and details of the BMP.
Horizontal Control Plans
RRM will prepare horizontal control plans, at an appropriate scale, for the approved design. The plans will establish all horizontal control for the Project. The plans will also establish construction layout control points and establish a coordinate system for locating all site elements.
Construction, Grading, and Drainage Plans
RRM's team will prepare construction, grading and drainage plans, at an appropriate scale, for the approved design based on the topographic survey. The plans will build on the boundary and topographic information and will show all vertical control of the project elements, contour grading, spot elevations, and cut and fill estimates within the project site. The plans will detail drainage facilities around the restroom and facility building area with supporting calculations performed for the sizing of new on -site pipes and inlets as outlined in the above task.
The construction, grading and drainage plans will also present the overall hardscape layout with a keynoting system that identifies construction items, references to appropriate details, and drawing series directions. RRM will prepare details for the construction items illustrated on the grading plans. The details will specify materials, dimensions, colors, and finishes.
Site Utilities
RRM will prepare plan construction documents for domestic water service, fire water and sanitary sewer, storm drains (e.g., "wet" utilities) contained within the property, and connection to the new restroom and storage facility. Water, sewer, and storm drain plans will include vertical and horizontal design
Veterans Park Restroom Renovation
Exhibit "A" Scope of Services
information. RRM assumes adequate service and capacity for the wet utilities. Electrical and gas are not included in this plan sheet (see site electrical below).
Park Restroom and Storage Building Plans and Details
RRM's architecture and structural team will prepare construction plans and details for one (1) park building which will include a restroom and storage facility. The construction documents will include exterior and interior plans, materials and systems specifications, Title 24 energy documentation, engineering reports, calculations, and details necessary to process the buildings through the Building Department.
Mechanical Plans and Details
RRM's subconsultant, P2S, will prepare mechanical plans that show airflow calculations and drawings for the new restroom and storage facility which will include new exhaust fans and louvers in the restrooms.
Mechanical details and equipment will be included. Existing building systems will be integrated into existing control systems if available.
Plumbing Plans and Details
RRM's subconsultant, P2S, will prepare plumbing plans for the new restroom and storage facility using plumbing load calculations for domestic water and waste. Drawings will provide ADA compliant fixture and equipment selections, plumbing plans with fixture locations, sewer and vent connections, and riser diagrams with associated fixture unit valves for water and waste. Plumbing details and schedules will also be included.
Site Electrical Plans and Details
RRM's subconsultant, P2S, will prepare electrical plans for the new restroom and storage facility using documented electrical equipment and services, develop electrical distribution system and prepare electrical single -line diagrams. The plans will include the following upgrades: electric hand dryers, LED lighting, exterior mounted LED lighting, outlets, power for mechanical equipment, and an electric chain coiling door.
Electric and gas utility trench locations will be shown schematically based on coordination with a specialty sub -consultant and/or utility service provider. The plans shall be subject to final utility company handout drawings (prepared by others as deferred submittals). We assume adequate service for this project is available directly adjacent to the project frontage.
Specifications
RRM's team will prepare technical specifications (CSI Division 02 through 48 as applicable). This scope assumes the City will prepare all Division 00 and 01 general provision specification sections related to this project and assemble the specifications book.
Construction Cost Opinions
RRM's construction cost estimator will estimate construction costs at the 65%, 90% and 100% submittal levels. The detailed Construction Cost Opinion will be itemized with supporting item descriptions and unit
Veterans Park Restroom Renovation
Exhibit "A" Scope of Services
costs. Due to many variables surrounding bidding and construction conditions, this opinion will not represent a guarantee that bids received, or actual costs of construction will be equal to the opinion.
Exhibit "B" Compensation
I. C ensat on
s°tr Renova
Task 1: Design Development Services
Subtask 1.01:
Subtask 1.02:
Subtask 1.03:
Subtask 1.04:
Project Kickoff Meeting & Field Investigation
Draft Schematic Plan
50% Design Development
100% Design Development
Task 2: Construction Document Services
Subtask 2.01: 75% Draft Construction Documents
Subtask 2.02: 100% Draft Construction Documents
Subtask 2.03: Permit Processing Assistance
Subtask 2.04: Bid -Ready Construction Documents
Task 3: Construction Support Services
Subtask 3.01:
Subtask 3.02:
Subtask 3.03:
Subtask 3.04:
Bidding Support
Construction Administration Support
Construction Observation
Record Drawings
Task 4: Project Coordination Services
Subtask 4.01:
Subtask 4.02:
Subtask 4.03:
Project Coordination & Management
Project Development Team Meetings
QA/QC Review
Total Design Services
Estimated Reimbursable Expenses (see note 3)
n
eve ents
Fixed Fee: $
Fixed Fee: $
Fixed Fee:$
Fixed Fee:$
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
2,855
13,215
27,511
32,924
84,364
37,044
3,600
11,835
12,470
31,870
17,060
11,345
7,945
5,925
5,175
Fixed Fee: $ 305,138
T&M NTE: $ 2,000
Notes:
1. Fixed Fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced.
2.Not-to-Exceed (NTE) fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced.
3.Reimbursable expenses include such things as document reproduction, plotting services, public meeting materials, company car mileage (current federal rate), lodging, travel, rental car, per diem for survey crew, and overnight delivery. Reimbursable expenses will be billed as incurred at cost plus 10%. r 2 El-1\111On
Veterans Park Restroom Renovation
Exhibit "B" Compensation
4.RRM may adjust any individual line -item amount within the total overall budget amount shown, with written approval of the City.
5.RRM reserves the right to adjust hourly rates on an annual basis.
CITY OF BELL GARDENS
OFFICE OF THE CITY MANAGER
EXECUTIVE SUMMARY
TO: Honorable Mayor and City Council Members
FROM: Michael B. O'Kelly, City Manager
BY: Bernardo Iniguez, Director of Public Works/Facilities SUBJECT: Consideration of a Resolution Approving a Professional Services Agreement with Infrastructure Architects, Inc. for Design, Architecture and Engineering Services for the Veterans Park Restroom Renovation
DATE: January 26, 2025
RECOMMENDATION:
It is staff's recommendation that the City Council:
1) Adopt the attached Resolution authorizing the City Manager to execute a Professional Services Agreement with Infrastructure Architects, Inc. for Design, Architecture and Engineering Services for the Veterans Park Restroom Renovation, in a form approved by the City Attorney; and 2) Authorize the City Manager to approve additional design services that may be necessary to cover any unforeseen conditions in an amount not to exceed 10% of the Professional Services Agreement.
BACKGROUND/DISCUSSION:
The City of Bell Gardens Veterans Park is located at 6662 Loveland Street. Veterans Park is one of the City's primary recreational hubs, offering an array of activities for all ages. In 2022, the City was awarded a $3,997,000 Statewide Park Development and Community Revitalization (Prop 68) Grant, and in 2024, the City was awarded a $700,000 U.S.
Department of Housing and Urban Development Community Project Funding (HUD CPF) Grant. Additionally, the City allocated $1,085,567 of its Community Development Block Grant (CDBG) in 2025. Prop 68 funds will be utilized for the Veterans Park Refurbishment project and the CDBG and HUD CPF funds will be utilized for the Veterans Park Restroom Renovation project, for a total of $5,782,567 for the Veterans Park Refurbishment and Restroom Renovation.
As part of this grant, the City recently installed the outdoor fitness equipment in Fall 2024.
A total of 30 pieces of fitness equipment is now available for public use. Additionally, lighting improvements required by the grant were completed in February 2025, which included the removal and replacement of lighting fixtures with new LED lighting throughout Veterans Park, and the replacement of the ballfield lights with new ballfield
LED lighting. The remaining improvements call for architectural elements that require professional design services.
On July 31, 2025, the City released a Request for Proposals for Design, Architecture and Engineering Services for the Veterans Park Refurbishment and Restroom Renovation ("RFP"). On August 15, 2025, the City issued Addendum No. 1 to include a mandatory pre -proposal meeting and extend the proposal submittal deadline to September 16, 2025.
On September 12, 2025, the City issued Addendum No. 2 to respond to requests for information, revise the scope of services, and extend the proposal submittal deadline to October 2, 2025. On September 29, 2025, the City issued Addendum No. 3 to provide additional responses to requests for information.
On October 2, 2025, the City received proposals from 10 proposers as listed below in alphabetical order:
• BOA Architecture
• Hirsch & Associates, Inc.
• IDS Group, Inc.
• Infrastructure Architects, Inc.
• MIG, Inc
• Mithun KDI
• RJM Design Group
• RRM Design Group
• SVA Architects
• West of West
The responsive proposals were reviewed and rated by Public Works and Recreation and Community Services staff based on their completeness in response to the following evaluation criteria outlined in the RFP:
• Comprehension of the Request for Proposals (Max score: 25 points). • Qualifications of Proposer (Max score: 45 points).
• References (Max Score: 20 points).
• Fee proposal (Max Score: 10 points).
On November 24, 2025, a panel consisting of Public Works staff conducted interviews with the top five scoring proposers to further assess their qualifications. The table below illustrates the rank and scores of the proposers after interviews, from the highest ranked to the lowest ranked proposer:
Rank
Firm Name
Score
1 RRM Design Group
91 2
IDS Group, Inc.
89 3
RJM Design Group
89 4
BOA Architects
82 5
Infrastructure Architects, Inc.
80
Although agreements for professional services need not be awarded to the lowest responsible proposer, cost may be considered as a factor. As the RFP was structured for a single agreement, several firms submitted comprehensive pricing that reflects the combined project scope, while others provided separate itemized pricing for the Veterans Park Refurbishment and the Restroom Renovation.
The table below illustrates a comparison of the costs provided by the responsive proposers, from the highest ranked to the lowest ranked proposer:
Rank
Firm Name
Proposal Type
Proposal Cost
1 RRM Design Group
Itemized
$603,471 (VP Refurbishment)
$305,138 (Restroom Renovation)
Total Proposal Amount: $908, 609
2 IDS Group, Inc.
Comprehensive
$428,619 (VP Refurbishment and Restroom
Renovation)
$74,220 (Optional Tasks)
Total Proposal Amount: $502,839
3 RJM Design Group
Comprehensive
$682,000 - $869,900 (VP Refurbishment and
Restroom Renovation — Final pricing based on
final scope)
$187,770 (Optional Tasks)
Total Proposal Amount: $869,770 - $1,057,670
4 BOA Architects
Comprehensive
$503,000 (VP Refurbishment and Restroom
Renovation)
Total Proposal Amount: $503,000
5 Infrastructure Architects, Inc.
Itemized
$301,245 (VP Refurbishment)
$170,606 (Restroom Renovation)
Total Proposal Amount: $471,851
Public Works initially intended to award these projects to a single consultant; however, the RFP evaluation and interview process showed that a project of this magnitude would yield better results by awarding separate agreements. This approach would leverage the specific strengths of firms to meet the individual demands of each project. Additionally, this action allows the City to balance resources and receive the best possible expertise from two design approaches.
In determining a recommendation, staff emphasizes that expertise, project approach, qualifications, and costs are important factors to consider. While other consulting firms scored higher during the evaluation phase, Infrastructure Architects, Inc.'s ("IA") proposal focuses on keeping costs low with a simple, functional design for the Restroom Renovation. Focusing on a streamlined design, the Restroom Renovation will be less prone to design changes and delays often associated with over -engineered designs. It is the City's priority to complete the Restroom Renovation ahead of the grants' deadlines.
Expediting the project timeline is essential to secure the funds and protect the City from future shifts in federal priorities and appropriations. Therefore, the completion of the Restroom Renovation is contingent upon a firm that can meet these timelines
Additionally, IA has experience working in Southeast Los Angeles Region and possesses valuable knowledge on local regulations and the community's expectations. Because of their familiarity with local regulations and community expectations, IA can transition directly into the design phase, as they already possess the necessary local context.
Therefore, IA's proposal best aligns with the Restroom Renovation's specific constraints and makes them the most effective consultant for the Veterans Park Restroom Renovation.
CONCLUSION:
Based on IA's proposal rating, staff is recommending that the City Council award IA a Professional Services Agreement for the Design, Architecture and Engineering Services for the Veterans Park Restroom Renovation for a three-year term, or until completion of the project, whichever occurs first.
FISCAL IMPACT:
The Professional Services Agreement not to exceed amount is $170,606. A 10% contingency in the amount of $17,060 for additional design services, if requested by the City Manager, would be added to the Agreement, for a total amount of $187,666. The current FY 25/26 budget includes sufficient funding for design services for the Veterans Park Restroom Renovation.
APPROVALS:
Michael B. O'Kelly, City Manager
Stephanie Vasquez, City Attorney
Manuel Carrillo, Director of Finance and Administrative Services
RESOLUTION NO. 2026-16
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BELL
GARDENS, CALIFORNIA, APPROVING A PROFESSIONAL
SERVICES AGREEMENT WITH INFRASTRUCTURE ARCHITECTS,
INC. FOR DESIGN, ARCHITECTURE AND ENGINEERING SERVICES
FOR THE VETERANS PARK RESTROOM RENOVATION
WHEREAS, in accordance with Bell Gardens Municipal Code Section 3.04.105, on August 15, 2025, the City released a Request for Proposals for Design, Architecture and Engineering Services for the Veterans Park Refurbishment and Restroom Renovation ("RFP"); and
WHEREAS, on August 15, 2025, the City released Addendum No. 1 to the RFP to include a mandatory pre -proposal meeting and extend the proposal submittal deadline to September 16, 2025; and
WHEREAS, on September 12, 2025, the City released Addendum No. 2 to the RFP to respond to requests for information, revise the scope of services, and extend the proposal submittal deadline to October 2, 2025; and
WHEREAS, on September 29, 2025, the City released Addendum No. 3 to the RFP to provide additional responses to requests for information; and WHEREAS, a comprehensive review and interview process was conducted of the responsive proposals by City staff using the evaluation criteria specified in the RFP for such responsive proposals; and
WHEREAS, City staff determined that Infrastructure Architects, Inc. is the most qualified consultant to perform such contracted services by virtue of its experience, training, licenses, and expertise; and
WHEREAS, the City desires to enter into a Professional Services Agreement with Infrastructure Architects, Inc. for Design, Architecture and Engineering Services for the Veterans Park Restroom Renovation for a three-year term, or until completion of the project, whichever occurs first.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Bell Gardens as follows:
SECTION 1. The City Council, after consideration of the staff report and presentation, discussion, oral testimony and evidence presented to the City Council, hereby finds that the above recitals are true and correct and incorporate them herein.
SECTION 2. The City Council hereby approves a Professional Services Agreement for Design, Architecture and Engineering Services for the Veterans Park
Resolution No. 2026-16
Restroom Renovation by and between Infrastructure Architects, Inc., for a total not -to - exceed sum of $170,606, with a ten percent (10%) contingency, for a three-year term or until completion of the Veterans Park Restroom Renovation, whichever occurs first, in a form approved by the City Attorney.
SECTION 3. The City Council further authorizes the City Manager to execute the Professional Services Agreement between the City and Infrastructure Architects, Inc., consistent with this Resolution, along with any ancillary documents reasonably necessary to effectuate the intent of this Resolution.
SECTION 4. The City Clerk shall attest and certify to the passage and adoption of this Resolution and enter it into the book of original resolutions, and it shall become effective immediately upon its approval.
PASSED, APPROVED, and ADOPTED this 26th day of January, 2026.
THE CITY OF BELL GARDENS
Miguel De La Rosa, Mayor
APPROVED AS TO FORM: ATTEST:
Stephanie Vasquez
City Attorney
2 of 3
Daisy Gomez
City Clerk
Resolution No. 2026-16
I, , City Clerk of the City of Bell Gardens, hereby CERTIFY that City Council Resolution No. was adopted by the Bell Gardens City Council at a regular meeting of the City Council held on January 26, 2026, and was approved and passed by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Daisy Gomez
City Clerk
3 of 3
2026
PROFESSIONAL SERVICES AGREEMENT
(Engagement: Design, Architecture and Engineering Services, Veterans Park Restroom Renovation)
(Parties: Infrastructure Architects, Inc. and City of Bell Gardens) THIS PROFESSIONAL SERVICES AGREEMENT (hereinafter, "Agreement") is made and entered into this day of 2026 (hereinafter, the "Effective Date"), by and between the CITY OF BELL GARDENS, a municipal corporation (hereinafter, "CITY") and INFRASTRUCTURE ARCHITECTS, INC. (hereinafter, "CONSULTANT"). For the purposes of this Agreement, CITY and CONSULTANT may be referred to collectively by the capitalized term "Parties." The capitalized term "Party" may refer to CITY or CONSULTANT interchangeably, as appropriate.
RECITALS
WHEREAS, CITY requires design, architecture and engineering services for the Veterans Park Restroom renovation (hereinafter, "Project"); and WHEREAS, CITY staff has determined that CONSULTANT possesses the experience, skills and training necessary to competently provide such services to CITY; and
WHEREAS, the execution of this Agreement was approved by the Bell Gardens City Council at its Regular Meeting on January 26, 2026.
NOW, THEREFORE, for and in consideration of the mutual covenants and conditions herein contained, CITY and CONSULTANT agree as follows:
I .
ENGAGEMENT TERMS
1.1 TERM: CONSULTANT shall complete the various tasks identified in the Scope of Work, defined below, and shall complete all services and tasks contemplated under this Agreement no later than the earlier of the following: (i) sixty (60) calendar days following the date upon which the City Council has accepted the Project as complete and has authorized the recordation of a final Notice of Acceptance for all of the Project Work; or (ii) three (3) years from the Effective Date of this Agreement.
Nothing in this Section shall operate to prohibit or otherwise restrict the CITY's ability to terminate this Agreement at any time for convenience or for cause as provided under Article V (Termination), below.
1.2 SCOPE OF WORK:
A. Subject to the terms and conditions of this Agreement, CONSULTANT agrees to provide the services and tasks described in that certain Request for Proposals of CITY entitled "Request for Proposals for Design, Architecture and Engineering Services for the Veterans Park Refurbishment
and Restroom Renovation" (hereinafter, "CITY RFP") dated July, 31, 2025, and the written proposal of CONSULTANT entitled "City of Bell Gardens Design, Architecture and Engineering Services for the Veterans Park Refurbishment and Restroom Renovation" (hereinafter, the "CONSULTANT PROPOSAL") dated October 2, 2025. The CITY RFP and the CONSULTANT PROPOSAL are attached and incorporated hereto as Exhibit "A" and "B" respectively. The term "Scope of Work" shall be a collective reference to the CITY RFP and the CONSULTANT PROPOSAL as it relates only to the Design, Architecture and Engineering Services for the Veterans Park Restroom Renovation. The capitalized term "Work" shall be a collective reference to all the various services and tasks referenced in the Scope of Work. In the event of any conflict or inconsistency between the provisions of the document entitled CITY RFP and the provisions of the document entitled CONSULTANT PROPOSAL, the requirements of the document entitled CITY RFP shall govern and control but only to the extent of the conflict or inconsistency and no further. In the event of any conflict or inconsistency between the provisions of the Scope of Work and the provisions of this Agreement to which the Scope of Work is attached, the provisions of this Agreement shall govern and control.
1.3 PROSECUTION OF WORK:
A. CONSULTANT shall perform the Work contemplated under this Agreement on an as -needed basis. Nothing in this Agreement shall be construed to grant CONSULTANT the exclusive right to perform any of the types of services or tasks contemplated under this Agreement nor shall anything in this Agreement be construed to entitle CONSULTANT to the receipt of any sums under this Agreement, except to the extent CITY requests the performance of any Work in the manner described below and such Work is in fact performed and completed by CONSULTANT and accepted by CITY.
CITY requests for the performance of specific as -needed services or tasks contemplated under this Agreement shall be made in the form of a written work order(s) issued by the City Representative (each such written request hereinafter referred to as a "Task Order"). The standard Task Order form will be provided by the City Representative and shall include the following information:
1. A detailed description of the specific services or tasks requested;
2. The location of where the particular services or tasks are to be performed, if applicable;
3. A not -to -exceed budget for performing the services or tasks;
4. A timeline for completing the requested services or tasks;
5. Any other information CITY deems necessary and relevant to the requested services or tasks; and
6. The signature of the City Representative, confirming that the services or tasks have been authorized by the City Representative.
B. CONSULTANT shall perform no as -needed work under this Agreement 2
without a signed Task Order provided by the City Representative, containing the information set forth in Section 1.3 (A), above.
C. Time is of the essence in the performance of Work under this Agreement, and in the absence of a specific schedule or other instructions from the City Representative, CONSULTANT shall begin and complete performance of the Work in a timely and a diligently manner as possible.
1.4 COMPENSATION: CONSULTANT shall perform the Work in accordance with Proposal Price Sheet beginning on page 48 of the CONSULTANT PROPOSAL (hereinafter, the "FEE SCHEDULE"). The foregoing notwithstanding, CONSULTANT's total compensation for the performance of all Work contemplated under this Agreement, will not exceed the total budgeted aggregate sum of ONE HUNDRED SEVENTY THOUSAND SIX HUNDRED SIX DOLLARS ($170,606), (hereinafter, the "Not -to -Exceed Sum"), during the Term of this Agreement unless such added expenditures are first approved by the City Council. In the event CONSULTANT's charges are projected to exceed the Not -to -Exceed Sum prior to the expiration of this Agreement, CITY may suspend CONSULTANT's performance pending CITY's approval of any anticipated expenditures in excess of the Not -to -Exceed Sum or any other CITY approved amendment to the compensation terms of this Agreement. As authorized by the City Council at its Regular Meeting of January 26, 2026, and subject to any applicable restrictions set forth under the Bell Gardens Municipal Code as the same may be amended from time to time or applicable State law, CITY, in its sole and absolute discretion, may authorize expenditures in excess of the Not -to -Exceed Sum without further City Council approval provided such additional expenditures do not cumulatively exceed an amount equal to ten percent (10%) of the Not -to -Exceed Sum. Any such additional expenditures must be approved by the City Manager in writing before they may be incurred.
1.5 PAYMENT OF COMPENSATION: Following the conclusion of each calendar month, CONSULTANT shall submit to CITY an itemized invoice indicating the services performed and tasks completed during the recently concluded calendar month, including any applicable services and tasks performed and the reimbursable out-of-pocket expenses incurred. If the amount of CONSULTANT's compensation is a function of hours worked by CONSULTANT's personnel, the invoice should indicate the number of hours worked, the persons responsible for performing the Work, the rate of compensation at which such services and tasks were performed, the subtotal for each task and service performed and a grand total for all services performed. Within thirty (30) calendar days of receipt of each invoice, CITY will notify CONSULTANT in writing of any disputed amounts included in the invoice. Within forty-five (45) calendar days of receipt of each invoice, CITY will pay all undisputed amounts included on the invoice. CITY will not withhold applicable taxes or other authorized deductions from payments made to CONSULTANT.
1.6 ACCOUNTING RECORDS: CONSULTANT will maintain complete and accurate records with respect to all matters covered under this Agreement for a period of three (3) years after the expiration or termination of this Agreement. CITY will have 3
the right to access and examine such records, without charge, during normal business hours. CITY will further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.
1.7 ABANDONMENT BY CONSULTANT: In the event CONSULTANT ceases to perform the Work agreed to under this Agreement or otherwise abandons the undertaking contemplated herein prior to the expiration of this Agreement or prior to completion of any or all tasks set forth in the Scope of Work, CONSULTANT will deliver to CITY immediately and without delay, all materials, records and other work product prepared or obtained by CONSULTANT in the performance of this Agreement. Furthermore, CONSULTANT will only be compensated for the reasonable value of the services, tasks and other Work performed up to the time of cessation or abandonment, less a deduction for any damages, costs or additional expenses which CITY may incur as a result of CONSULTANT's cessation or abandonment.
II.
PERFORMANCE OF AGREEMENT
2.1 CITY'S REPRESENTATIVE: The CITY hereby designates Bernardo Iniguez, Director of Public Works/Facilities (hereinafter, the "City Representative"), to act as its representative for the performance of this Agreement. The City Representative or their designee will act on behalf of the CITY for all purposes under this Agreement. CONSULTANT will not accept directions or orders from any person other than the City Representative or their designee.
2.2 CONSULTANT REPRESENTATIVE: CONSULTANT hereby designates Raymond Abassi, CEO/President, to act as its representative for the performance of this Agreement (hereinafter, "Consultant Representative"). Consultant Representative will have full authority to represent and act on behalf of the CONSULTANT for all purposes under this Agreement. Consultant Representative or their designee will supervise and direct the performance of the Work, using their best skill and attention, and will be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Agreement. Notice to the Consultant Representative will constitute notice to CONSULTANT.
2.3 COORDINATION OF SERVICE; CONFORMANCE WITH REQUIREMENTS:
CONSULTANT agrees to work closely with CITY staff in the performance of the Work and this Agreement and will be available to CITY staff and the City Representative at all reasonable times. All work prepared by CONSULTANT will be subject to inspection and approval by City Representative or their designees.
2.4 STANDARD OF CARE; PERFORMANCE OF EMPLOYEES: CONSULTANT represents, acknowledges and agrees to the following:
A. CONSULTANT will perform all Work skillfully, competently and to the highest standards of CONSULTANT's profession;
4
B. CONSULTANT shall at all times employ such force, plant, materials, and tools as will be sufficient in the opinion of the CITY to perform the Work within the time limits established, and as provided herein. It is understood and agreed that said tools, equipment, apparatus, facilities, labor, and material shall be furnished and said Work performed and completed as required by the Agreement, and subject to the approval of the CITY's authorized representative;
C. CONSULTANT will perform all Work in a manner reasonably satisfactory to the CITY;
D. CONSULTANT will comply with all applicable federal, state and local laws and regulations, including the conflict of interest provisions of Government Code Section 1090 and the Political Reform Act (Government Code Section 81000 et seq.). CONSULTANT shall be liable for all violations of such laws and regulations in connection with the Work. If CONSULTANT performs any work knowing it to be contrary to such laws, rules and regulations, CONSULTANT shall be solely responsible for all costs arising therefrom; E. CONSULTANT understands the nature and scope of the Work to be performed under this Agreement as well as any and all schedules of performance;
F. All of CONSULTANT's employees and agents possess sufficient skill, knowledge, training and experience to perform those services and tasks assigned to them by CONSULTANT; and
G. All of CONSULTANT's employees and agents (including, but not limited to, subcontractors and subconsultants) possess all licenses, permits, certificates, qualifications and approvals of whatever nature that are legally required to perform the tasks and services contemplated under this Agreement and all such licenses, permits, certificates, qualifications and approvals will be maintained throughout the term of this Agreement and made available to CITY for copying and inspection.
The Parties acknowledge and agree that CONSULTANT will perform, at CONSULTANT's own cost and expense and without any reimbursement from CITY, any services necessary to correct any errors or omissions caused by CONSULTANT's failure to comply with the standard of care set forth under this Section or by any like failure on the part of CONSULTANT's employees, agents, contractors, subcontractors and subconsultants. Such effort by CONSULTANT to correct any errors or omissions will be commenced immediately upon their discovery by either Party and will be completed within seven (7) calendar days from the date of discovery or such other extended period of time authorized by the City Representative in writing and in their sole and absolute discretion. The Parties acknowledge and agree that CITY's acceptance of any work performed by CONSULTANT or on CONSULTANT's behalf will not constitute a release of any deficiency or delay in performance. The Parties further acknowledge, understand 5
and agree that CITY has relied upon the foregoing representations of CONSULTANT, including but not limited to the representation that CONSULTANT possesses the skills, training, knowledge and experience necessary to perform the Work skillfully, competently and to the highest standards of CONSULTANT's profession.
2.5 ASSIGNMENT: The skills, training, knowledge and experience of CONSULTANT are material to CITY's willingness to enter into this Agreement. Accordingly, CITY has an interest in the qualifications and capabilities of the person(s) who will perform the services and tasks to be undertaken by CONSULTANT or on behalf of CONSULTANT in the performance of this Agreement. In recognition of this interest, CONSULTANT agrees that it will not assign or transfer, either directly or indirectly or by operation of law, this Agreement or the performance of any of CONSULTANT's duties or obligations under this Agreement without the prior written consent of the CITY. In the absence of CITY's prior written consent, any attempted assignment or transfer will be ineffective, null and void and will constitute a material breach of this Agreement.
2.6 SUBSTITUTION OF KEY PERSONNEL: CONSULTANT has represented to CITY that certain key personnel will perform and coordinate the Work under this Agreement. Should one or more of such personnel become unavailable, CONSULTANT may substitute other personnel of at least equal competence upon written approval of CITY. In the event that CITY and CONSULTANT cannot agree as to the substitution of key personnel, CITY shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Work in a manner acceptable to the CITY, or who are determined by the CITY to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the CONSULTANT at the request of the CITY.
2.7 CONTROL AND PAYMENT OF SUBORDINATE: The Work will be performed by CONSULTANT or under CONSULTANT's strict supervision. CONSULTANT will determine the means, methods and details of performing the Work subject to the requirements of this Agreement. CITY retains CONSULTANT on an independent contractor basis and not as an employee. CONSULTANT reserves the right to perform similar or different services for other principals during the term of this Agreement, provided such work does not unduly interfere with CONSULTANT's competent and timely performance of the Work contemplated under this Agreement and provided the performance of such services does not result in the unauthorized disclosure of CITY's confidential or proprietary information. Any additional personnel performing the Work under this Agreement on behalf of CONSULTANT are not employees of CITY and will at all times be under CONSULTANT's exclusive direction and control. CONSULTANT will pay all wages, salaries and other amounts due to such personnel and will assume responsibility for all benefits, payroll taxes, Social Security and Medicare payments and the like. CONSULTANT will be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: Social Security taxes, income tax withholding, unemployment insurance, disability insurance, 6
workers' compensation insurance and the like.
2.8 REMOVAL OF EMPLOYEES OR AGENTS: If any of CONSULTANT's officers, employees, agents, contractors, subcontractors or subconsultants are determined by the City Representative to be uncooperative, incompetent, a threat to the adequate or timely performance of the tasks assigned to CONSULTANT, a threat to persons or property, or if any of CONSULTANT's officers, employees, agents, contractors, subcontractors or subconsultants fail or refuse to perform the Work in a manner acceptable to the CITY, such officer, employee, agent, contractor, subcontractor or subconsultant will be promptly removed by CONSULTANT and will not be reassigned to perform any of the Work.
2.9 COMPLIANCE WITH LAWS: CONSULTANT will keep itself informed of and in compliance with all applicable federal, state or local laws to the extent such laws control or otherwise govern the performance of the Work. CONSULTANT's compliance with applicable laws will include, without limitation, compliance with all applicable Cal/OSHA requirements and applicable regulations of the Federal Department of Housing and Urbanization.
2.10 NON-DISCRIMINATION: CONSULTANT represents that it is an equal opportunity employer and it shall not discriminate against any subconsultant, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.
2.11 INDEPENDENT CONTRACTOR STATUS: The Parties acknowledge, understand and agree that CONSULTANT and all persons retained or employed by CONSULTANT are, and will at all times remain, wholly independent contractors and are not officials, officers, employees, departments or subdivisions of CITY.
CONSULTANT will be solely responsible for the negligent acts and/or omissions of its employees, agents, contractors, subcontractors and subconsultants.
CONSULTANT and all persons retained or employed by CONSULTANT will have no authority, express or implied, to bind CITY in any manner, nor to incur any obligation, debt or liability of any kind on behalf of, or against, CITY, whether by contract or otherwise, unless such authority is expressly conferred to CONSULTANT under this Agreement or is otherwise expressly conferred by CITY in writing.
I II.
INSURANCE
3.1 DUTY TO PROCURE AND MAINTAIN INSURANCE: Prior to the beginning of and throughout the duration of the Work, CONSULTANT will procure and maintain policies of insurance that meet the requirements and specifications set forth under this Article. CONSULTANT will procure and maintain the following insurance coverage, at its own expense:
A. Commercial General Liability Insurance: CONSULTANT will procure and 7
maintain Commercial General Liability Insurance ("CGL Coverage") as broad as Insurance Services Office Commercial General Liability coverage (occurrence Form CG 0001) or its equivalent. Such CGL Coverage will have minimum limits of no less than One Million Dollars ($1,000,000.00) per occurrence and Two Million Dollars ($2,000,000.00) in the general aggregate for bodily injury, personal injury, property damage, operations, products and completed operations, and contractual liability.
B. Automobile Liability Insurance: CONSULTANT will procure and maintain Automobile Liability Insurance as broad as Insurance Services Office Form Number CA 0001 covering Automobile Liability, Code 1 (any auto). Such Automobile Liability Insurance shall have minimum limits of no less than One Million Dollars ($1,000,000.00) per accident for bodily injury and property damage.
C. Workers' Compensation Insurance/ Employer's Liability Insurance: A policy of workers' compensation insurance in such amount as will fully comply with the laws of the State of California and which will indemnify, insure and provide legal defense for both CONSULTANT and CITY against any loss, claim or damage arising from any injuries or occupational diseases occurring to any worker employed by or any persons retained by CONSULTANT in the course of carrying out the Work contemplated in this Agreement.
D. Errors & Omissions Insurance: For the full term of this Agreement and for a period of three (3) years thereafter, CONSULTANT will procure and maintain Errors and Omissions Liability Insurance appropriate to CONSULTANT's profession. Such coverage will have minimum limits of no less than One Million Dollars ($1,000,000.00) per claim.
3.2 ADDITIONAL INSURED REQUIREMENTS: The CGL Coverage and the Automobile Liability Insurance will contain an endorsement naming the CITY and CITY's elected and appointed officials, officers, employees, agents and volunteers as additional insureds.
3.3 REQUIRED CARRIER RATING: All varieties of insurance required under this Agreement will be procured from insurers admitted in the State of California and authorized to issue policies directly to California insureds. Except as otherwise provided elsewhere under this Article, all required insurance will be procured from insurers who, according to the latest edition of the Best's Insurance Guide, have an A.M. Best's rating of no less than A:VII. CITY may also accept policies procured by insurance carriers with a Standard & Poor's rating of no less than BBB according to the latest published edition of the Standard & Poor's rating guide. As to Workers' Compensation Insurance/ Employer's Liability Insurance, the CITY Representative is authorized to authorize lower ratings than those set forth in this Section.
3.4 PRIMACY OF CONSULTANT'S INSURANCE: All policies of insurance provided by CONSULTANT will be primary to any coverage available to CITY or CITY's 8
elected or appointed officials, officers, employees, agents or volunteers. Any insurance or self-insurance maintained by CITY or CITY's elected or appointed officials, officers, employees, agents or volunteers will be in excess of CONSULTANT's insurance and will not contribute with it.
3.5 WAIVER OF SUBROGATION: All insurance coverage provided pursuant to this Agreement will not prohibit CONSULTANT or CONSULTANT's officers, employees, agents, subcontractors or subconsultants from waiving the right of subrogation prior to a loss. CONSULTANT hereby waives all rights of subrogation against CITY, its officials, officers, employees agents and volunteers.
3.6 VERIFICATION OF COVERAGE: CONSULTANT acknowledges, understands and agrees, that CITY's ability to verify the procurement and maintenance of the insurance required under this Article is critical to safeguarding CITY's financial well-being and, indirectly, the collective well-being of the residents of the CITY.
Accordingly, CONSULTANT warrants, represents and agrees that it will furnish CITY with original certificates of insurance and endorsements evidencing the coverage required under this Article on forms satisfactory to CITY in its sole and absolute discretion. The certificates of insurance and endorsements for each insurance policy will be signed by a person authorized by that insurer to bind coverage on its behalf, and will be on forms provided by the CITY if requested. All certificates of insurance and endorsements will be received and approved by CITY as a condition precedent to CONSULTANT's commencement of any Work. Upon CITY's written request, CONSULTANT will also provide CITY with certified copies of all required insurance policies and endorsements.
3.7 FAILURE TO MAINTAIN COVERAGE: In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced immediately so as to avoid a lapse in the required coverage, CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by CITY will be promptly reimbursed by CONSULTANT or CITY will withhold amounts sufficient to pay premium from CONSULTANT payments. In the alternative, CITY may cancel this Agreement effective upon notice.
3.8 SPECIAL RISKS OR CIRCUMSTANCES. CITY reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
IV.
INDEMNIFICATION
4.1 The Parties agree that CITY and CITY's elected and appointed officials, officers, employees, agents and volunteers (hereinafter, the "City Indemnitees") should, to the fullest extent permitted by law, be protected from any and all loss, injury, damage, claim, lawsuit, cost, expense, attorneys' fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the City Indemnitees with 9
the fullest protection possible under the law. CONSULTANT acknowledges that CITY would not enter into this Agreement in the absence of CONSULTANT's commitment to indemnify, defend and protect CITY as set forth herein.
Notwithstanding the foregoing, to the extent CONSULTANT's Work are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to Claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT.
CONSULTANT's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the CITY, its officials, officers, employees, agents or volunteers.
4.2 To the fullest extent permitted by law, CONSULTANT shall indemnify, hold harmless and defend the City Indemnitees from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys' fees, expert fees and all other costs, and fees of litigation) of every nature arising out of or in connection with CONSULTANT's performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole negligence or willful misconduct of the CITY.
4.3 CITY shall have the right to offset against the amount of any compensation due to CONSULTANT under this Agreement, any amount due to CITY from CONSULTANT as a result of CONSULTANT's failure to either pay CITY promptly for any costs associated with CONSULTANT's obligations to indemnify the City Indemnitees under this Article, or related to CONSULTANT's failure to either (i) pay taxes on amounts received pursuant to this Agreement, or (ii) comply with applicable workers' compensation laws.
4.4 The obligations of CONSULTANT under this Article will not be limited by the provisions of any workers' compensation act or similar act. CONSULTANT expressly waives its statutory immunity under such statutes or laws as to CITY and CITY's elected and appointed officials, officers, employees, agents, and volunteers.
4.5 CONSULTANT agrees to obtain executed indemnity agreements with provisions identical to those set forth herein this Article from each and every subcontractor or any other person or entity involved by, for, with or on behalf of CONSULTANT in the performance of this Agreement. In the event CONSULTANT fails to obtain such indemnity obligations from others as required herein, CONSULTANT agrees to be fully responsible and indemnify, hold harmless and defend CITY and CITY's elected and appointed officials, officers, employees, agents, and volunteers from and against any and all claims and losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of CONSULTANT's subcontractors or any other person or entity involved by, for, with or on behalf of CONSULTANT in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys' fees incurred by counsel of CITY's choice.
10
4.6 CITY does not, and shall not, waive any rights that it may possess against CONSULTANT because of the acceptance by CITY, or the deposit with CITY, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost, or expense.
4.7 This Article and all provisions contained herein (including but not limited to the duty to indemnify, defend, and hold free and harmless) shall survive the termination or normal expiration of this Agreement and is in addition to any other rights or remedies which the CITY may have at law or in equity.
4.8 WORK OF CONSULTANT'S DESIGN PROFESSIONALS SERVICES: The duty to indemnify, defend and hold harmless as set forth under this subsection shall apply to the negligence, recklessness or willful misconduct of any individual who qualifies as a "design professional" within the meaning of subsection (c)(2) of Section 2782.8 of the California Civil Code in so far as such negligence, recklessness or willful misconduct occurs in the performance, work or activities that must be performed by a "design professional." Subject to the limitation of the preceding sentence, to the fullest extent permitted by law, CONSULTANT shall immediately defend and indemnify and hold harmless the City Indemnities, defined above, from and against any and all liability, loss, damage, expense, cost (including without limitation reasonable attorneys' fees, expert fees and all other costs and fees of litigation) of every nature arising out of the negligence, recklessness, or willful misconduct of CONSULTANT or any of CONSULTANT's officers, employees, servants, agents, contractors, subcontractors or authorized volunteers or any other person or entity involved by, for, or with or on behalf of CONSULTANT in the performance of design professional services under this Agreement. The Parties understand and agree that the duty of CONSULTANT to indemnify, defend and hold harmless pursuant to this subsection includes the duty to defend as set forth in Section 2778 of the California Civil Code. CONSULTANT's obligation to indemnify applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of an indemnified party. If it is finally adjudicated that liability is caused by the comparative active negligence or willful misconduct of an indemnified party, then CONSULTANT's indemnification obligation shall be reduced in proportion to the established comparative liability.
4.9 WORK OF ALL OTHER PERSONS/NON-DESIGN PROFESSIONALS: Except as otherwise provided under Section 4.2 of this Article, above, to the fullest extent permitted by law, CONSULTANT shall indemnify, defend and hold harmless the City Indemnitees from and against all liability, loss, damage, expense, cost (including without limitation reasonable attorneys' fees, expert fees and all other costs and fees of litigation) of every nature to the extent caused by CONSULTANT's negligent performance under this Agreement, including but not limited to the negligent acts, errors or omissions of CONSULTANT or CONSULTANT's officers, employees, agents, servants, contractors, subcontractors or subconsultants or the failure of the same to comply with any of the duties, obligations or standards of care set forth herein. The duty to indemnify, 11
defend and hold harmless under this subsection shall not encompass a duty to indemnity, defend or hold harmless for liability, loss, suit, damage, expense, or cost caused by the negligence or willful misconduct of any or all of the City Indemnitees. The duty to indemnify, defend and hold harmless as set forth under this subsection is intended to encompass liabilities, losses, damages, expense and costs not otherwise subject to subsection 4.2, above.
4.10 As to the duties to indemnify under Sections 4.1 and 4.2 of this Article, above, CITY shall have the right to offset against the amount of any compensation due CONSULTANT under this Agreement any amount due CITY from CONSULTANT as a result of CONSULTANT's failure to pay CITY promptly any indemnification arising under this Article and related to CONSULTANT's failure to either: (i) pay taxes on amounts received pursuant to this Agreement, or (ii) comply with applicable workers' compensation laws.
4.11 As to the duties to indemnify under Sections 4A and 4.2 of this Article, above, the obligations of CONSULTANT under this Article will not be limited by the provisions of any workers' compensation act or similar act. CONSULTANT expressly waives its statutory immunity under such statutes or laws as to CITY and CITY's elected and appointed officials, officers, employees, agents and authorized volunteers.
4.12 As to the duties to indemnify under Sections 4.1 and 4.2 of this Article, above, CONSULTANT agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Article from each and every subcontractor or any other person or entity involved by, for, with or on behalf of CONSULTANT in the performance of this Agreement. In the event CONSULTANT fails to obtain such indemnity obligations from others as required herein, CONSULTANT agrees to be fully responsible and indemnify, hold harmless and defend CITY and CITY's elected and appointed officials, officers, employees, agents and authorized volunteers from and against any and all claims and losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of CONSULTANT's subcontractors or any other person or entity involved by, for, with or on behalf of CONSULTANT in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys' fees incurred by counsel of CITY's choice.
4.13 As to the duties to indemnify under Sections 4.1 and 4.2 of this Article, above, CITY does not, and shall not, waive any rights that it may possess against CONSULTANT because of the acceptance by CITY, or the deposit with CITY, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.
4.14 As to the duties to indemnify under Sections 4.1 and 4.2 of this Article, above, the duties to indemnify, defend and hold harmless as set forth under this Section, shall survive the early termination or normal expiration of this Agreement and shall be in addition to any other rights or remedies which the CITY may have at law or in 12
equity.
V.
TERMINATION
5.1 TERMINATION WITHOUT CAUSE: CITY may immediately terminate this Agreement at any time for convenience and without cause by giving prior written notice of CITY's intent to terminate this Agreement which notice shall specify the effective date of such termination. Upon such termination for convenience, CONSULTANT will be compensated only for those services and tasks which have been performed by CONSULTANT up to the effective date of the termination.
CONSULTANT may not terminate this Agreement except for cause as provided under Section 5.2, below. If this Agreement is terminated as provided herein, CITY may require CONSULTANT to provide all finished or unfinished Documents and Data, as defined in Section 6.1, below, and other information of any kind prepared by CONSULTANT in connection with the performance of the Work.
CONSULTANT will be required to provide such Documents and Data within fifteen (15) calendar days of CITY's written request. No actual or asserted breach of this Agreement on the part of CITY pursuant to Section 5.2, below, will operate to prohibit or otherwise restrict CITY's ability to terminate this Agreement for convenience as provided under this Section.
5.2 EVENTS OF DEFAULT; BREACH OF AGREEMENT:
A. In the event either Party fails to perform any duty, obligation, service or task set forth under this Agreement (or fails to timely perform or properly perform any such duty, obligation, service or task set forth under this Agreement), an event of default (hereinafter, "Event of Default") will occur. For all Events of Default, the Party alleging an Event of Default will give written notice to the defaulting Party (hereinafter referred to as a "Default Notice") which will specify: (i) the nature of the Event of Default; (ii) the action required to cure the Event of Default; (iii) a date by which the Event of Default will be cured, which will not be less than the applicable cure period set forth under Sections 5.2(B) and 5.2(C), below, or if a cure is not reasonably possible within the applicable cure period, to begin such cure and diligently prosecute such cure to completion. The Event of Default will constitute a breach of this Agreement if the defaulting Party fails to cure the Event of Default within the applicable cure period or any extended cure period allowed under this Agreement.
B. CONSULTANT will cure the Event of Default within the following time periods:
Within ten (10) business days of CITY's issuance of a Default Notice for any failure of CONSULTANT to timely provide CITY or CITY's employees or agents with any information and/or written reports, documentation or work product which CONSULTANT is obligated to provide to CITY or CITY's employees or agents under this Agreement.
Prior to the expiration of the 10 -day cure period, CONSULTANT may 13
submit a written request for additional time to cure the Event of Default upon a showing that CONSULTANT has commenced efforts to cure the Event of Default and that the Event of Default cannot be reasonably cured within the 10 -day cure period. The foregoing notwithstanding, CITY will be under no obligation to grant additional time for the cure of an Event of Default under this Section 5.2(B)(i) that exceeds seven (7) calendar days from the end of the initial 10 -day cure period; or ii . Within fourteen (14) calendar days of CITY's issuance of a Default Notice for any other Event of Default under this Agreement. Prior to the expiration of the 14 -day cure period, CONSULTANT may submit a written request for additional time to cure the Event of Default upon a showing that CONSULTANT has commenced efforts to cure the Event of Default and that the Event of Default cannot be reasonably cured within the 14 -day cure period. The foregoing notwithstanding, CITY will be under no obligation to grant additional time for the cure of an Event of Default under this Section 5.2(B)(ii) that exceeds thirty (30) calendar days from the end of the initial 14 -day cure period.
In addition to any other failure on the part of CONSULTANT to perform any duty, obligation, service or task set forth under this Agreement (or the failure to timely perform or properly perform any such duty, obligation, service or task), an Event of Default on the part of CONSULTANT will include, but will not be limited to the following: (i) CONSULTANT's refusal or failure to perform any of the services or tasks called for under the Scope of Work; (ii) CONSULTANT's failure to fulfill or perform its obligations under this Agreement within the specified time or if no time is specified, within a reasonable time; (iii) CONSULTANT's and/or its employees' disregard or violation of any federal, state, local law, rule, procedure or regulation; (iv) the initiation of proceedings under any bankruptcy, insolvency, receivership, reorganization, or similar legislation as relates to CONSULTANT, whether voluntary of involuntary; (v) CONSULTANT's refusal or failure to perform or observe any covenant, condition, obligation or provision of this Agreement; and/or (vii) CITY's discovery that a statement representation or warranty by CONSULTANT relating to this Agreement is false, misleading or erroneous in any material respect.
C. CITY will cure any Event of Default asserted by CONSULTANT within forty- five (45) calendar days of CONSULTANT's issuance of a Default Notice unless the Event of Default cannot reasonably be cured within the 45 -day cure period. Prior to the expiration of the 45 -day cure period, CITY may submit a written request for additional time to cure the Event of Default upon a showing that CITY has commenced its efforts to cure the Event of Default and that the Event of Default cannot be reasonably cured within the 45 -day cure period. The foregoing notwithstanding, an Event of Default dealing with CITY's failure to timely pay any undisputed sums to CONSULTANT as provided under Section 1.5, above, will be cured by CITY within five (5) calendar days from the date of CONSULTANT's Default Notice to CITY. 14
D. CITY, in its sole and absolute discretion, may also immediately suspend CONSULTANT's performance under this Agreement pending
CONSULTANT's cure of any Event of Default by giving CONSULTANT written notice of CITY's intent to suspend CONSULTANT's performance (hereinafter, a "Suspension Notice"). CITY may issue the Suspension Notice at any time upon the occurrence of an Event of Default. Upon such suspension, CONSULTANT will be compensated only for those services and tasks which have been rendered by CONSULTANT to the reasonable satisfaction of CITY up to the effective date of the suspension. No actual or asserted breach of this Agreement on the part of CITY will operate to prohibit or otherwise restrict CITY's ability to suspend this Agreement as provided herein.
E. No waiver of any Event of Default or breach under this Agreement will constitute a waiver of any other or subsequent Event of Default or breach.
No waiver, benefit, privilege, or service voluntarily given or performed by a Party will give the other Party any contractual rights by custom, estoppel, or otherwise.
F. The duties and obligations imposed under this Agreement and the rights and remedies available hereunder will be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law. In addition to any other remedies available to CITY at law or under this Agreement in the event of any breach of this Agreement, CITY, in its sole and absolute discretion, may also pursue any one or more of the following remedies:
Upon written notice to CONSULTANT, the CITY may immediately terminate this Agreement in whole or in part;
. Upon written notice to CONSULTANT, the CITY may extend the time of performance;
iii . The CITY may proceed by appropriate court action to enforce the terms of the Agreement to recover damages for CONSULTANT's breach of the Agreement or to terminate the Agreement; or
iv. The CITY may exercise any other available and lawful right or remedy.
CONSULTANT will be liable for all legal fees plus other costs and expenses that CITY incurs upon a breach of this Agreement or in the CITY's exercise of its remedies under this Agreement.
G. In the event CITY is in breach of this Agreement, CONSULTANT's sole remedy will be the suspension or termination of this Agreement and/or the recovery of any unpaid sums lawfully owed to CONSULTANT under this Agreement for completed services and tasks.
5.3 SCOPE OF WAIVER: No waiver of any default or breach under this Agreement 15
will constitute a waiver of any other default or breach, whether of the same or other covenant, warranty, agreement, term, condition, duty or requirement contained in this Agreement. No waiver, benefit, privilege, or service voluntarily given or performed by a Party will give the other Party any contractual rights by custom, estoppel, or otherwise.
5.4 SURVIVING ARTICLES, SECTIONS AND PROVISIONS: The termination of this Agreement pursuant to any provision of this Article or by normal expiration of its term or any extension thereto will not operate to terminate any Article, Section or provision contained herein which provides that it will survive the termination or normal expiration of this Agreement.
VI.
MISCELLANEOUS PROVISIONS
6.1 DOCUMENTS & DATA; LICENSING OF INTELLECTUAL PROPERTY: All Documents and Data will be and remain the property of CITY without restriction or limitation upon their use or dissemination by CITY. For purposes of this Agreement, the term "Documents and Data" means and includes all reports, analyses, correspondence, plans, designs, notes, summaries, strategies, charts, schedules, spreadsheets, calculations, lists, data compilations, documents or other materials developed and/or assembled by or on behalf of CONSULTANT in the performance of this Agreement and fixed in any tangible medium of expression, including but not limited to Documents and Data stored digitally, magnetically and/or electronically. This Agreement creates, at no cost to CITY, a perpetual license for CITY to copy, use, reuse, disseminate and/or retain any and all copyrights, designs, and other intellectual property embodied in all Documents and Data. CONSULTANT will require all subcontractors and subconsultants working on behalf of CONSULTANT in the performance of this Agreement to agree in writing that CITY will be granted the same right to copy, use, reuse, disseminate and retain Documents and Data prepared or assembled by any subcontractor or subconsultant as applies to Documents and Data prepared by CONSULTANT in the performance of this Agreement.
6.2 CONFIDENTIALITY: All data, documents, discussion, or other information developed or received by CONSULTANT or provided for performance of this Agreement are deemed confidential and will not be disclosed by CONSULTANT without prior written consent by CITY. CITY will grant such consent of disclosure as legally required. Upon request, all CITY data will be returned to CITY upon the termination or expiration of this Agreement. CONSULTANT will not use CITY's name or insignia, photographs, or any publicity pertaining to the Work in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of CITY.
6.3 FALSE CLAIMS ACT: CONSULTANT warrants and represents that neither CONSULTANT nor any person who is an officer of, in a managing position with, or has an ownership interest in CONSULTANT has been determined by a court or tribunal of competent jurisdiction to have violated the False Claims Act, 31 U.S.C., Section 3789 et seq. and the California False Claims Act, Government Code 16
Section 12650 et seq.
6.4 NOTICES: All notices permitted or required under this Agreement will be given to the respective Parties at the following addresses, or at such other address as the respective Parties may provide in writing for this purpose:
CONSULTANT:
Infrastructure Architects, Inc.
100 Progress, Suite 110
Irvine, CA 92618
Attn: Raymond Abassi, CEO/President
Phone: 213-880-4000
CITY:
City of Bell Gardens
7100 S. Garfield Avenue
Bell Gardens, CA 90201
Attn: Bernardo Iniguez, Director of
Public Works/Facilities
Phone: 562-806-7770
Such notices will be deemed effective when personally delivered or successfully transmitted by facsimile as evidenced by a fax confirmation slip or when mailed, forty-eight (48) hours after deposit with the United States Postal Service, first class postage prepaid and addressed to the Party at its applicable address.
6.5 COOPERATION; FURTHER ACTS: The Parties will fully cooperate with one another and will take any additional acts or sign any additional documents as are reasonably necessary, appropriate or convenient to achieve the purposes of this Agreement.
6.6 SUBCONTRACTING: CONSULTANT will not subcontract any portion of the Work required by this Agreement, except as expressly stated herein, without the prior written approval of CITY. Subcontracts (including without limitation subcontracts with subconsultants), if any, will contain a provision making them subject to all provisions stipulated in this Agreement, including provisions relating to insurance requirements and indemnification.
6.7 CITY'S RIGHT TO EMPLOY OTHER CONSULTANTS: CITY reserves the right to employ other contractors in connection with the various projects worked upon by CONSULTANT.
6.8 PROHIBITED INTERESTS: CONSULTANT warrants, represents and maintains that it has not employed nor retained any company or person, other than a bona fide employee working solely for CONSULTANT, to solicit or secure this Agreement. Further, CONSULTANT warrants and represents that it has not paid, nor has it agreed to pay any company or person, other than a bona fide employee working solely for CONSULTANT, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, CITY will have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of CITY, during the term of his or her service with CITY, will have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
6.9 TIME IS OF THE ESSENCE: Time is of the essence for each and every provision 17
of this Agreement.
6.10 GOVERNING LAW AND VENUE: This Agreement will be interpreted and governed according to the laws of the State of California. In the event of litigation between the Parties, the venue, without exception, will be in the Los Angeles County Superior Court of the State of California. If, and only if, applicable law requires that all or part of any such litigation be tried exclusively in federal court, the venue, without exception, will be in the Central District of California located in the City of Los Angeles, California.
6.11 ATTORNEYS' FEES: If either Party commences an action against the other Party, legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing Party in such litigation will be entitled to have and recover from the losing Party reasonable attorneys' fees and all other costs of such action.
6.12 SUCCESSORS AND ASSIGNS: This Agreement will be binding on the successors and assigns of the Parties.
6.13 NO THIRD -PARTY BENEFIT: There are no intended third -party beneficiaries of any right or obligation assumed by the Parties. All rights and benefits under this Agreement inure exclusively to the Parties.
6.14 CONSTRUCTION OF AGREEMENT: This Agreement will not be construed in favor of, or against, either Party but will be construed as if the Parties prepared this Agreement together through a process of negotiation and with the advice of their respective attorneys.
6.15 SEVERABILITY: If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions will continue in full force and effect.
6.16 AMENDMENT; MODIFICATION: No amendment, modification or supplement of this Agreement will be valid or binding unless executed in writing and signed by both Parties, subject to CITY approval. The requirement for written amendments, modifications or supplements cannot be waived and any attempted waiver will be void and invalid.
6.17 CAPTIONS: The captions of the various articles, sections and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.
6.18 INCONSISTENCIES OR CONFLICTS: In the event of any conflict or inconsistency between the provisions of this Agreement and any of the exhibits attached hereto, the provisions of this Agreement will control.
6.19 ENTIRE AGREEMENT: This Agreement, including all attached exhibits, constitutes the entire, complete, final and exclusive expression of the Parties with respect to the matters addressed herein and supersedes all other agreements or 18
understandings, whether oral or written, which may have been entered into between CITY and CONSULTANT prior to the execution of this Agreement. Any statements, representations, or other agreements, whether oral or written, made by either Party that is not embodied herein will not be valid or binding on the Parties. No amendment, modification or supplement to this Agreement will be valid and binding unless in writing and duly executed by the Parties pursuant to Section
6.16, above.
6.20 FORCE MAJEURE: The Term shall be extended in the event of any delays due to unforeseeable causes beyond the control of CONSULTANT and without the fault or negligence of CONSULTANT, including but not limited to severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the CITY. CONSULTANT shall within three (3) calendar days of the commencement of such delay notify the City Representative in writing of the causes of the delay.
The City Representative shall ascertain the facts and the extent of delay and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the City Representative such delay is justified. The City Representative's determination shall be final and conclusive upon the parties to this Agreement. In no event shall CONSULTANT be entitled to recover damages against the CITY for any delay in the performance of this Agreement, however caused, CONSULTANT's sole remedy being extension of the Agreement pursuant to this Section.
6.21 COUNTERPARTS: This Agreement may be executed in any number of counterparts, each of which shall be deemed an original, but all of which when taken together shall constitute one and the same instrument. One fully executed original counterpart will be delivered to CONSULTANT and two original counterparts will be retained by CITY.
(SIGNATURES ON NEXT PAGE)
19
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed the day and year first appearing in this Agreement, above.
CITY OF BELL GARDENS: INFRASTRUCTURE ARCHITECTS, INC.:
By: By:
Name: Name:
Title: Title:
Date: Date:
APPROVED AS TO FORM:
By:
Stephanie Vasquez, City Attorney
20
EXHIBIT "A"
CITY RFP
21
REQUEST FOR PROPOSALS
FOR
DESIGN, ARCHITECTURE AND ENGINEERING SERVICES FOR
THE VETERANS PARK REFURBISHMENT AND RESTROOM RENOVATION RFP Release Date
Thursday, July 31, 2025
Proposal Submittal Deadline
5:00 p.m., Thursday, August 28, 2025
Contact Person:
Bernardo Iniguez, Director of Public Works/Facilities
City of Bell Gardens
8327 Garfield Avenue
Bell Gardens, CA 90201
(562) 806-7770
biniquez bellgardens.orq
7100 Garfield Avenue • Bell Gardens, CA 90201 • (562) 806-7700 • www.bellgardens.org
TABLE OF CONTENTS
TABLE OF CONTENTS 2
I. INTRODUCTION 3
II. SUBMITTAL PROCEDURES/DEADLINE 4
III. SCHEDULE 5
IV. TERMS AND CONDITIONS 5
V. SCOPE OF SERVICES 11
VI. PROPOSAL FORMAT AND CONTENT REQUIREMENTS 14
VII. EVALUATION CRITERIA 16
ATTACHMENTS:
Attachment A — Proposal Price Sheet
Attachment B — Acknowledgement of City's Standard Form of Agreement Attachment C — Sample Professional Services Agreement
INTRODUCTION
The City of Bell Gardens (City) was incorporated on August 1, 1961 as a general law city, thus, it operates under the Council/Manager form of government. The five City Council members are elected at -large by registered voters in the City for staggered four-year terms and serve as the City's legislative, policy -making body. The Mayor position is shared among the Council members who select one another as Mayor annually. The City Council holds bi-monthly public meetings. The City Manager is responsible for directing City affairs as prescribed by the City Council. The City has a population of approximately 39,000 in an area of 2.4 square miles located in the southeastern part of Los Angeles County. The City shares a common boundary with the Cities of South Gate, Bell, Downey, and Commerce. The City is considered an integral part of the Los Angeles -Long Beach metropolitan area.
The City's departments include Finance and Administration, City Clerk, Community Development, Recreation and Community Services, Police, and Public Works. Fire services are provided by the Los Angeles County Fire Department. The Public Works Department consists of various divisions, including Administration, Street Maintenance, Parks and Facilities Maintenance, Utilities and Contracts, Solid Waste Management, Transportation Services, and the City Water System.
The City of Bell Gardens' Veterans Park is located at 6662 Loveland Street. Veterans Park acts as one of the City's primary recreational hubs, offering an array of activities for all ages. In 2022, the City was awarded a $3,997,000 Statewide Park Development and Community Revitalization (Prop 68) Grant, and in 2024, the City was awarded a $700,000 U.S. Department of Housing and Urban Development Community Project Funding (HUD CPF) Grant.
Additionally, the City allocated $1,085,567 of its Community Development Block Grant (CDBG) in 2025. Prop 68 funds will be utilized for the Veterans Park Refurbishment project and the CDBG and HUD CPF funds will be utilized for the Veterans Park Restroom Renovation project, for a total of $5,782,567 for the Veterans Park Refurbishment and Restroom Renovation.
The City is seeking proposals from qualified consultants with proven expertise to provide professional design, architecture and engineering services for the following two projects:
1) Veterans Park Refurbishment - The preparation of the plans, specifications, and estimate for the construction of a shade sail at the outdoor fitness center, a community amphitheater with a lawn, two therapeutic gardens with signage, two picnic areas, a walking trail system, public art, improved landscaping throughout the park, renovation of the basketball, tennis, futsal, and volleyball courts, and improvements to the interior of the Ross Hall Recreation Center & Cultural Center; and
2) Veterans Park Restroom Renovation - The preparation of the plans, specifications, and estimate for the renovation of the outdoor restroom adjacent to the ballfield.
It is the intent of the City to select a single consultant or consultants to provide the requested architectural design services. However, the City reserves the right to accept or reject any or all responses received in response to this Request for Proposals (RFP). The City also reserves the right to waive any informality, technical defect or clerical error or irregularity in any 3
response. The City's potential award of an agreement will not be based on any single factor, nor will it be based solely or exclusively on the lowest cost proposal. If an agreement is awarded, it will be awarded to the consultant who, in the judgment of the City, has presented an optimal balance of relevant experience, price, quality of service, work history and other factors which the City may consider relevant and important in determining which proposal is best for the City. Additionally, the City may, for any reason, decide not to award an agreement based on this RFP. The City reserves the right to cancel this RFP. The City shall not be obligated to respond to any responses submitted, nor be legally bound in any manner by the submission of the response. The City reserves the right to negotiate deliverables and associated costs. The term of the Agreement will be for one (1) year with one (1) optional one- year extension.
I. SUBMITTAL PROCEDURES/DEADLINE
An electronic version of the proposal shall be emailed to c lerkdeskc( hells ardens.orc and biniquez c(z�,bellgardens.orq no later than 5:00 p.m. on Thursday, August 28, 2025. Additionally, three hard copy sets of the proposal shall be mailed no later than 5:00 p.m. on Thursday, August 28, 2025, to the City Clerk's Office. The electronic version of the proposal must be an exact duplicate of the hard copies and the subject line must read "City of Bell Gardens Proposal for Design, Architecture and Engineering Services for the Veterans Park Refurbishment and Restroom Renovation Proposal." If the proposal includes any comments over and above the specific information requested in this RFP, such information should be included as a separate appendix and placed at the end of the proposal.
Postmarks by this date are unacceptable and no facsimiles will be accepted. Please mail or deliver your response in a sealed envelope with "City of Bell Gardens Proposal for Design, Architecture and Engineering Services for the Veterans Park Refurbishment and Restroom Renovation" written below the address label and addressed as follows:
City Clerk's Office
Attention: Daisy Gomez, City Clerk
City of Bell Gardens
7100 Garfield Avenue
Bell Gardens, CA 90201
Questions and Inquiries
To ensure a fair and objective RFP process and evaluation, all questions and inquiries related to this RFP shall be addressed in writing to Bernardo Iniguez, Director of Public Works/Facilities, at biniguez(a�bellcardensorq, with a copy to Karla Gonzalez, Senior Management Analyst, at kgonzalez(c�bellgardens.orc. The deadline for written questions and inquiries is Thursday, August 14, 2025, at 5:00 p.m. City Hall is open Monday through Thursday from 7:30 a.m. to 6:00 p.m.
4
Il
SCHEDUL
E
The tentative schedule for this RFP is as follows:
Milestones*
Date
Release of RFP
Thursday, July 31, 2025
Deadline for Question Submittal
Thursday, August 14, 2025 at 5:00 o.m.
Proposal Submission Deadline
Thursday, August 28, 2025 at 5:00 p.m.
Proposers Interviews (if necessary)
Tuesday, September 10, 2025
**Tentative City Council Recommendation
Award/Agreement Approval
of
Monday, September 22, 2025
*The schedule above is tentative and subject to change at the discretion of the City, with appropriate notice to prospective Proposers. Please check the Bell Gardens website for the latest updates at https://www.be/lgardens.org/i-want-to/view-bids-rfps/rfps-and- bids. All times posted are in pacific standard time (PST). **Proposer must be available on Monday, September 22, 2025, in -person or virtually for a possible presentation to the City Council.
V. TERMS AND CONDITIONS
PROFESSIONAL SERVICES AGREEMENT
Upon conclusion of the RFP process, staff will recommend a consultant to the City Council.
The successful consultant will be required to enter into a professional services agreement with the City. A copy of the City's professional services agreement is attached and incorporated as Attachment "C" as a sample for consultant to review the terms and conditions prior to submitting a proposal. The proposal process, agreement negotiations and execution, and subsequent actions will be conducted by the City in accordance with applicable law. Consultant should carefully review this document, which constitutes the formal RFP, to ensure a clear understanding of the City's needs and objectives and scope of work. The sample professional service agreement (Attachment "C") is not to be completed by consultant.
The length of the agreement will be for one (1) year with an optional one (1) year extension.
GENERAL INSTRUCTIONS, TERMS AND CONDITIONS
A. Proposals shall be prepared to simply and economically provide a straightforward, concise description of the proposer's ability to meet the requirements of this RFP.
Emphasis shall be on the quality, completeness, clarity of content, responsiveness to the requirements, and an understanding of City's objectives.
B. Proposers shall carefully read the information contained in this RFP and shall submit 5
complete responses to all requirements and questions as directed. Incomplete proposals may be considered non -responsive and may be rejected in the City's discretion. The submission of a response to this RFP shall be deemed a representation and certification by the proposer that it has read and understood the RFP, has investigated all aspects of the RFP, and is aware of the applicable facts pertaining to the RFP process, its procedures and requirements. No request for modification of the responses to this request shall be considered after its submission on grounds that the proposer was not fully informed as to any facts or condition.
C. Proposers should be aware that the RFP and the contents of the successful proposal will become a part of any subsequent professional services agreement that may arise from this RFP. Following the Proposal Submission Deadline, the City, pursuant to the California Public Records Act (Govt. Code section 7920.000 et seq.) reserves the right to make copies of all submitted proposals available for inspection and copying by any interested member of the public, except to the limited extent the City determines that any information contained in a proposal is legally privileged under the California Public Records Act. By submission of a proposal, proposers acknowledge and agree that their proposal and any information contained therein may be disclosed by the City to interested members of the public, including other proposers. All responses to the RFP received become a matter of public record and shall be regarded as public records, with the exception for those elements in each proposal which are defined by the proposer as business or trade secrets and plainly marked as "Confidential," "Trade Secret," or "Proprietary." The City shall not in any way be liable or responsible for the disclosure of any such proposal or portions thereof, if they are not plainly marked as "Confidential," "Trade Secret," or "Proprietary" or if disclosure is required under the Public Records Act.
Any proposal which contains language purporting to render all or significant portions of the proposal "Confidential," "Trade Secret," or "Proprietary" shall be regarded as nonresponsive.
D. Proposer shall be solely and exclusively responsible for all costs incurred in connection with the preparation and submission of the proposals; demonstrations; interviews; preparation of responses to questions and requests for additional information; for agreement discussions; or for anything in any way related to this RFP. The City is not liable for any costs incurred by a proposer in response to this RFP. Whether or not a proposer is awarded an Agreement pursuant to this RFP, no proposer shall be entitled to reimbursement for any costs or expenses associated with the proposer's participation in this RFP process. Failure to comply with all requirements contained in this RFP may result in the rejection of a proposal.
E. The City operates and is funded on a fiscal year basis from July 1st to June 30th.
Accordingly, the City reserves the right to terminate, without any liability, any agreement for which funding is not available.
F. The City shall not be responsible for any verbal communication between any employee of the City and any proposer. Only written requirements and qualifications will be considered. No oral statement of any person shall modify or otherwise change, or affect the terms, conditions, or specifications stated in the resulting agreement. 6
G. Receipt of an addendum of the RFP by a proposal must be acknowledged by submitting the signed addendum with the proposal.
H. A proposal may be modified or withdrawn in person at any time before the scheduled due date, provided a receipt for the withdrawn proposal is signed by the proposer's authorized representative. The City reserves the right to request proof of authorization to withdraw a proposal. Proposals may not be withdrawn after the proposal closing date and each proposer agrees to this stipulation upon submittal of its proposal. However, all proposals are subject to negotiation before a professional services agreement is awarded as further described below.
I. The City may, in the evaluation of proposals, request clarification from proposers regarding their proposals, obtain additional material or literature, and pursue other avenues of research as necessary to ensure that a thorough evaluation is conducted.
J. By submitting a proposal in response to this RFP, the proposer accepts the evaluation process and acknowledges and accepts that determination will require subjective judgments by the City.
K. Negotiations may be conducted with responsible proposers who submit proposals that are reasonably susceptible of being selected. All proposers reasonably susceptible of being selected based on criteria set forth in this RFP may be given an opportunity to make a presentation and/or interview. Although this process will ultimately result in the award of a single agreement, the City reserves the right to negotiate an agreement with more than one proposer.
L. The City expects the highest level of ethical conduct from proposals, including adherence to all applicable laws and local ordinances regarding ethical behavior.
M. The City reserves the right to reject any and all proposals received as a result of this RFP. The City's potential award of a professional services agreement will not be based on any single factor, nor will it be based solely or exclusively on the lowest cost proposal.
If a professional services agreement is awarded, it will be awarded to the consultant who in the judgment of the City, has presented an optimal balance of relevant experience, price, quality of service, work history and other factors which the City may consider relevant and important in determining which proposal(s) is best for the City. The City reserves the right to cancel or modify this RFP. There is no guarantee that the City will award a professional services agreement.
N. If an agreement cannot be reached with the highest ranked proposer, City reserves the right to terminate negotiations with that party and enter negotiations with the next highest ranked proposer.
O. Factors such as, but not limited to, any of the following may be considered just cause to disqualify a response to the RFP without further consideration:
a. Evidence of collusion, directly or indirectly, among consultants in regard to the amount, terms, or conditions of this proposal;
7 Page701 of817
b. Any attempt to improperly influence any member of the selection staff; c. Existence of any lawsuit, unresolved contractual claim or dispute between proposer and the City;
d. Evidence of incorrect information submitted as part of the RFP; e. Evidence of proposer's inability to successfully complete the responsibilities and obligations of the proposed scope of work; and
f. Proposer's default under any agreement, which results in termination of the professional services agreement.
P. Acceptance of any proposal is contingent upon the proposer's certification and agreement by submittal of its offer, to comply and act in accordance with all provisions of the City's Municipal Code.
The successful consultant shall not discriminate, in any way, against any person based on race, sex, color, age, religion, sexual orientation, actual or perceived gender identity, disability, ethnicity, or national origin, or any other protected classification in connection with or related to the performance of the professional services agreement.
Since some of the City's projects and programs are funded through State or federal funds, the selected consultant will comply with any applicable State or federal provisions, including but not limited to, the Community Development Block Grant (CDBG) Contract and Federal Provisions, which include Non-discrimination and Equal Employment Opportunity requirements, Conflict of Interest requirements, County Lobbying Certification, Warranty of Compliance with County's Defaulted Property Tax Reduction Program, and Federal Lobbying Certification. Also, if applicable, selection of the consultant will comply fully with the requirements of OMB Circular A-102 and all other federal procurement standards.
If federal funds are utilized, during the performance of the professional services agreement, the selected consultant will agree to comply with the following CDBG Contract and Federal provisions:
1. Non -Discrimination and Equal Employment Opportunity A. The consultant shall not discriminate as to race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation, in the performance of its services and duties pursuant to the agreement, and will comply with all rules and regulations of City relating thereto. Such nondiscrimination shall include but not be limited to the following: employment, upgrading, demotion, transfers, recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.
B. The consultant will, in all solicitations or advertisements for employees placed by or on behalf of consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation. 8
C. Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by the professional services agreement except contracts or subcontracts for standard commercial supplies or raw materials.
D. Executive Order 11246 requires that during the performance of this agreement, Consultant agrees not to discriminate against any employee or applicant for employment because of race, religion, sex, color or national origin. Consultant will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color or national origin. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer, rates of pay or other forms of compensation, and selection for training, including apprenticeship.
Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the consultant setting forth the provisions of this nondiscrimination clause.
E. Section 3 of the Housing and Community Development Act of 1968, as amended, 12 U.S.C. 1701 et seq., requires that, to the greatest extent feasible, opportunities for training and employment be given to lower income residents of the project area and contracts for work in connection with the project be awarded to business concerns which are located in or owned in substantial part by persons residing in the area of the project.
F. Title VI of the Civil Rights Act of 1964 provides that no person shall, on the ground of race, color or national origin, be excluded from participation in, be denied the benefits of, or be subject to discrimination under any program or activity receiving federal financial assistance.
G. Section 109, Title I of the Housing and Community Development Act of 1974 provides that no person shall, on the grounds of race, color, national origin, or sex be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program of activity funded in whole or in part with funds made available under this title.
H. Any prohibition against discrimination on the basis of age under the Age Discrimination Act of 1975, or with respect to an otherwise qualified disabled individual, as provided in Section 504 of the Rehabilitation Act of 1973, shall also apply.
2. Conflict of Interest
The consultant, its agents and employees shall comply with all applicable Federal, State and County laws and regulations governing conflict of interest including, but not limited to, 24 CFR Section 570.611 and 24 CFR Part 85, Section 85.36(b). The consultant agrees to incorporate the language found in this Section, Conflict of Interest, in agreements using CDBG funds and subject to compliance with conflict of interest Federal, State and County laws.
The general rule shall be that no person described in the Persons Covered section below of 9
this Section, Conflict of Interest, who exercise, or has exercised any function or responsibilities with respect to CDBG activities, or who is in a position to participate in a decision making process or gain inside information with regards to such activities, may obtain a financial interest or benefit from a CDBG-assisted activity, or have a financial interest in any contract, subcontract, or agreement with respect to CDBG-assisted activity, or with respect to the proceeds of the CDBG-assisted activity, either for themselves or those with whom they have business or immediate family ties, during their tenure or for one year thereafter.
Persons Covered: The conflict of interest provisions of this section, Conflict of Interest, shall apply to any person who is an employee, agent, consultant, officer, or elected official or appointed official of the City, or of any designated public agencies, or of any subrecipients that are receiving CDBG funds.
The consultant represents, warrants and agrees that to the best of its knowledge, it does not presently have, nor will it acquire during the term of the professional services agreement, any interest direct or indirect, by contract, employment or otherwise, or as a partner, joint venture or shareholder (other than as a shareholder holding a one (1%) percent or less interest in publicly traded companies) or affiliate with any business or business entity that has entered into any contract, subcontract or arrangement with the City. Upon execution of the professional services agreement and during its term, as appropriate, the consultant shall disclose in writing to the City any other contract or employment during the term of the professional services agreement by any other persons, business or corporation in which employment will or may likely develop a conflict of interest between the City's interest and the interests of the third parties.
3. Records and Audits
The consultant shall maintain accounts and records, including personnel, property and financial records, adequate to identify and account for all costs pertaining to the professional services agreement and such other records as may be deemed necessary by the City to assure proper accounting for all project funds, both federal and non-federal shares. These records will be made available for audit purposes to the City or any authorized representative, and will be retained five (5) years after the expiration of this Agreement unless permission to destroy them is granted by the City. (24 CFR Part 84, Sec. 84.53.)
4. Federal Lobbying Certification
If federal funds are utilized, the consultant certifies that:
A. No Federal appropriated funds have been paid or will be paid, by or on behalf of the consultant, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, and officer or employee of Congress, or an employee of any Member of Congress in connection with the awarding of any Federal contract, the making of any cooperative agreement, and the extension, continuation renewal, amendment, or modification of any Federal contract, grant, loan or cooperative agreement.
B. If any funds other than Federal appropriated funds have been paid or will be paid 10
to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the consultant shall complete and submit Standard Form-LLL, "Disclosures Form to Report Lobbying", in accordance with its instructions.
C. The consultant shall require that the language of this certification be included in all subcontracts and that all subcontracts shall certify and disclose accordingly.
V. SCOPE OF SERVICES
The primary goal of this RFP is to solicit proposals from qualified consultants who can provide the City with the professional design, architecture and engineering services for the Veterans Park Refurbishment and Restroom Renovation.
Veterans Park Refurbishment and Restroom Renovation
The purpose of the project is to improve the existing infrastructure in the park.
As part of this project, the City has recently installed an outdoor fitness center and new LED lighting. The selected consultant will be responsible for the design of the following features:
1. New Landscaping throughout the park;
2. New walking trail;
3. Construction of two (2) picnic areas;
4. Construction of a new splash pad with shaded seating;
5. Construction of two (2) new gardens;
6. Construction of one (1) community stage with lawn;
7. Renovation of one (1) baseball field, including adding stadium lighting ;
8. Renovation of two (2) existing basketball courts;
9. Renovation of one (1) volleyball court;
10. Renovation of one (1) existing futsal court;
11. Renovation of two (2) existing tennis courts; and
12. Renovation of Ross Hall Recreation and Cultural Center ("Community Center").
As an additional project, the selected consultant will perform the following:
1. Renovation and relocation of bathroom building; and
2. Renovation and relocation of storage building.
The consultant will provide project design services and construction support. The consultant's design staff shall have at least five (5) years of experience of providing design and construction support services to municipalities in California and have performed these services for California municipalities within the past twelve (12) months. Plans, specifications, engineering reports and/or studies must contain a valid registered professional engineer/architect stamp from consultant's staff, who shall be registered professionals in the State of California. The consultant's tasks will include, but are not limited to, the following:
11
1. Project Initiation and Feasibility Phase — Task No. 1 a. Project Kick-off Meeting: A kick-off meeting will be conducted to discuss the Consultant's approach to the project, recommendations for the project, and to finalize the project schedule. The consultant shall deliver an agenda and meeting notes.
b. Existing Conditions Survey: Perform an initial site walk-through and examination of existing plans and as-builts, a comprehensive review and confirmation of project requirements, taking into consideration operational programming needs.
The consultant shall conduct a comprehensive survey of existing park features, utilities (water, sewer, electrical, storm drains), irrigation systems, trees, topography, soil conditions, and site drainage. Gather all pertinent documentation of existing structures, their condition, and potential for renovation or demolition. c. Feasibility Studies: Assess regulatory requirements, potential CEQA/NEPA implications and permitting specific to park development.
Identify geotechnical considerations, existing easements, and potential environmental concerns (e.g., contamination, sensitive habitats). d. Conceptual and Schematic Designs: Develop multiple conceptual design alternatives based on programming and community input. Illustrate different approaches to site layout, circulation, facility placement, and aesthetic character.
Prepare and refine preliminary cost estimates based on schematic design and provide a construction cost estimate at the end of each design phase milestone for City's review and consideration.
Begin discussions with relevant permitting internal and external agencies (e.g., Planning, Building and Safety, Fire Department, etc.) regarding the schematic design and potential permitting requirements and processes.
Site and building designs should be modeled and produced with plans and full color presentation perspective renderings that are submitted in PDF and other electronic formats acceptable to the City.
2. Design Development — Task No. 2
a. Prepare detailed architectural plans, elevations, sections, and detailed for all proposed park structures and features. Select and specify major park materials, finishes, lighting fixtures, site furnishing and play equipment. b. Develop detailed site plans, grading plans, landscape plans and irrigation plans, if necessary. If applicable and directed by the City, the consultant shall prepare an erosion control plan utilizing best management practices and, if applicable, 12