14-C
TO:Honorable Mayor and Members of the City Council
ATTENTION:Ryan Smoot, City Manager
FROM:Len Gorecki, Assistant City Manager/Director of Public Works Melanie Paz, Management Analyst II
SUBJECT:Consideration and possible action to authorize the City Manager to execute Agreement File No.752.1, in a form approved by the City Attorney, with Michael Baker International, to provide an assessment of the Caruthers Park Regional Stormwater Capture and Infiltration System.
DATE:April 28, 2025
EXECUTIVE SUMMARY
This action would authorize the City Manager to execute an agreement (Agreement File No.752.1), with Michael Baker International for the Caruthers Park Stormwater Capture and Infiltration System project. The purpose of this agreement is to assess the current operating issues with the system, make recommendations for corrections and develop an on-going maintenance plan moving forward.
RECOMMENDATION TO CITY COUNCIL
1) Authorize the City Manager to execute Agreement File No.752.1, in a form approved by the City Attorney, with Michael Baker International; or 2) Alternatively, discuss and take other action related to this item.
FISCAL IMPACT
This agreement will not exceed $200,000 and is included in the Fiscal Year 2024-25 Public Works Maintenance and Operation budget for the Caruthers Park Stormwater Capture System in Account No. 320-42054-6022. Funding for this account is provided by Safe Clean Water – Regional Program.
DISCUSSION
On June 20, 2016, the City entered into a Cooperative Implementation Agreement with Caltrans to provide the City with $13 million in funds for the design and construction of the Stormwater Capture Project. The purpose of the project is to capture stormwater and urban runoff from both the Los Cerritos Channel and Lower San Gabriel River watersheds and address copper, lead, and zinc pollutant loads as required by the Municipal National Pollutant Discharge Elimination System (NPDES) Permit, the San Gabriel River Metals Total Maximum Daily Loads (Metals TMDL), and the Watershed Management Plans (“WMPs”) for the Los Cerritos Channel and Lower San Gabriel River. -1-
0y: BELLFLOLVEQ «*1 m stafteport
OF BELLFLOW «‘1 6‘ 0‘ I | R
W St"'ft'eport
Staff Report – Award of Contract – Michael Baker International April 28, 2025
DISCUSSION – Continued
In July 2021, following project completion, the City entered into an agreement with the City of Lakewood (AFN 844.1) for post-construction operations, maintenance and monitoring services of the facility. Lakewood initiated and performed monthly maintenance of the facility as well as SCADA monitoring operations, however this was short-lived as Lakewood staff struggled with the operations and maintenance of their own stormwater capture facilities at Bolivar and Mayfair parks. In short, Lakewood did not have the personnel capacity or equipment to provide the maintenance and operations for the Caruthers facility as well as their own stormwater facilities.
Bellflower, along with several other cities experiencing operational issues with the stormwater capture facilities, took these issues and concerns to the Gateway Water Management Authority (GWMA) and requested help in obtaining a list of vendors capable of providing the necessary maintenance and on-going operations needed to run these stormwater facilities. In response, the GWMA authority issued a Request for Qualifications in May 2024 to solicit qualified engineering/contracting firms with stormwater, wastewater or equivalent experience to provide the following services:
1) maintenance and operations; 2) remote control and monitoring of a system (SCADA); and 3) evaluation and assessment of stormwater facilities to optimize their performance.
Following the GWMA’s RFQ process, four firms were identified and listed as qualified lead firms that had the ability to perform the services including Craftwater, GeoSyntec Engineering, Michael Baker International and NV5.
After reviewing the qualifications of the four firms, Public Works staff felt that the Michael Baker International team was best suited to cover the operating issues at the Caruthers facility. Public Works met with representatives from Michael Baker International, provided them with as-built plans for the system and requested a proposal to assess the current condition of the facility including the mechanical equipment, the SCADA system and the condition of the sub-grade chambers. Michael Baker International has submitted a proposal to perform the initial assessment of the Caruthers facility in the amount of $136,220. A copy of the detailed proposal is attached.
CEQA
Pursuant to the California Environmental Quality Act (CEQA) (Public Resources Code §§ 21000, et seq.) and CEQA Guidelines (California Code of Regulations, Title 14, §§ 15000, et seq.), the City conducted an environmental assessment. Based on the environmental assessment, the project was determined to be categorically exempt pursuant to CEQA Guidelines § 15303 (Class 1 – Existing Facilities).
ATTACHMENTS
Michael Baker International Agreement .......................................................................... 3 Gateway RFQ and Agenda Report................................................................................ 17 -2-
AGREEMENT FILE NO.752.1
MAINTENANCE SERVICES AGREEMENT
BETWEEN
THE CITY OF BELLFLOWER AND
MICHAEL BARKER INTERNATIONAL
FOR STORMWATER CAPTURE SYSTEM AT CARUTHERS PARK
THIS MAINTENANCE AGREEMENT (“Agreement”) is made and entered into this 28th day of April 2025, by and between the CITY OF BELLFLOWER, municipal corporation and a charter city (“CITY”) and MICHAEL BAKER INTERNATIONAL, a CORPORATION (“CONTRACTOR”).
The Parties agree as follows:
1.CONSIDERATION.
A.As partial consideration, CONTRACTOR agrees to perform the work listed in the SCOPE OF SERVICES, below;
B.As additional consideration, CONTRACTOR and CITY agree to abide by the terms and conditions contained in this Agreement;
C. As additional consideration, CITY agrees to pay CONTRACTOR for CONTRACTOR’s services not to exceed a total of $200,000 for the work.
2.TERM.
A.The term of this Agreement will be from April 28, 2025 to April 27, 2026.
The Agreement may be renewed upon mutual consent of the parties by amending this Agreement.
3.SCOPE OF SERVICES.
A.This Agreement may be used for “maintenance services” which include the following:
i.Routine, recurring, and usual work for the preservation or protection of any publicly owned or publicly operated facility for its intended purposes.
ii.Minor repainting.
iii.Resurfacing of streets and highways at less than one inch. iv. Landscape maintenance.
v.Work performed to keep, operate, and maintain publicly owned water, power, or waste disposal systems and electrical transmission lines of 230,000 volts and higher.
vi. Carpentry, electrical, plumbing, glazing, and other craftwork.
B.CONTRACTOR will perform the maintenance services listed in the attached Exhibit “A,” which is incorporated by reference.
-3-
City of Bellflower
Agreement File No. 752.1
MICHAEL BAKER INTERNATIONAL
C. CONTRACTOR will, in a workmanlike manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONTRACTOR by this Agreement.
4.PREVAILING WAGES.
A.Pursuant to Labor Code § 1720, and as specified in 8 California Code of Regulations § 16000, CONTRACTOR must pay its workers prevailing wages. It is CONTRACTOR’s responsibility to interpret and implement any prevailing wage requirements and CONTRACTOR agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws.
B.In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY’s Engineering Division or the website for State of California Prevailing wage determination at http://www.dir.ca.gov/DLSR/PWD . CONTRACTOR must post a copy of the prevailing rate of per diem wages at the job site.
C. CITY directs CONTRACTOR’s attention to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by CONTRACTOR or any subcontractor.
D. Labor Code § 1777.5 requires CONTRACTOR or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate must also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except:
i.When employment in the area of coverage by the joint appren- ticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or
ii.When the number of apprentices in training in the area exceeds a ratio of one to five, or
-4-
City of Bellflower
Agreement File No. 752.1
MICHAEL BAKER INTERNATIONAL
iii.When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or
iv. When CONTRACTOR provides evidence that CONTRACTOR
employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen. v.CONTRACTOR is required to make contributions to funds estab- lished for the administration of apprenticeship programs if CONTRACTOR employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions. vi. CONTRACTOR and any subcontractor must comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices. vii. Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
E.CONTRACTOR and its subcontractors must keep an accurate certified payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with this Agreement.
The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Division of Labor Law Enforcement.
If requested by CITY, CONTRACTOR must provide copies of the records at its cost.
5.PAYMENTS.
A.For CITY to pay CONTRACTOR as specified by this Agreement, CONTRACTOR must submit a detailed invoice to CITY.
-5-
City of Bellflower
Agreement File No. 752.1
MICHAEL BAKER INTERNATIONAL
B.CITY’s City Manager may make payments up to $25,000 for special items of work not included in the project scope of work and services. Payments for special work will only be made after CITY issues a written notice to proceed for the specific special tasks. A written scope of work, an agreed upon additional fee, a schedule for starting and completing the special tasks, and an agreed upon extension of the time for performance, if needed to complete the special work, will be required before CITY issues a notice to proceed for special work. All special work will be subject to all other terms and provisions of this Agreement.
6.FAMILIARITY WITH WORK.
A.By executing this Agreement, CONTRACTOR represents that CONTRACTOR has:
i.Thoroughly investigated and considered the scope of services to be performed;
ii.Carefully considered how the services should be performed; and iii.Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.
B.If services involve work upon any site, CONTRACTOR warrants that CONTRACTOR has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. Should CONTRACTOR discover any latent or unknown conditions that may materially affect the performance of the services, CONTRACTOR will immediately inform CITY of such fact and will not proceed except at CONTRACTOR’s own risk until written instructions are received from CITY.
7.INSURANCE.
A.Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONTRACTOR will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below:
Type of Insurance Limits (combined single)
Commercial general liability $2,000,000
Automobile Liability $1,000,000
Workers compensation Statutory requirement
-6-
City of Bellflower
Agreement File No. 752.1
MICHAEL BAKER INTERNATIONAL
B.Commercial general liability insurance will meet or exceed the requirements of ISO-CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies will be endorsed to name City, its officials, and employees as “additional insureds” under said insurance coverage and to state that such insurance will be deemed “primary” such that any other insurance that may be carried by City will be excess thereto. Such insurance will be on an “occurrence,” not a “claims made,” basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to City.
C. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto).
D. CONTRACTOR will furnish to City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by City from time to time. Insurance must be placed with insurers with a current A.M.
Best Company Rating equivalent to at least a Rating of “A:VII.” Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. CONTRACTOR will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.
E.Self-Insured Retention/Deductibles. All policies required by this Agreement must allow CITY, as additional insured, to satisfy the self-insured retention (“SIR”) and deductible of the policy in lieu of the CONTRACTOR (as the named insured) should CONTRACTOR fail to pay the SIR or deductible requirements. The amount of the SIR or deductible is subject to the approval of the City Attorney and the Finance Director. CONSULTANT understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONTRACTOR as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CONTRACTOR’s behalf upon the CONTRACTOR’s failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against CONTRACTOR for breach of this Agreement in addition to any other damages incurred by CITY due to the breach. -7-
City of Bellflower
Agreement File No. 752.1
MICHAEL BAKER INTERNATIONAL
8.TIME FOR PERFORMANCE. CONTRACTOR will not perform any work under this Agreement until:
A.CONTRACTOR furnishes proof of insurance as required under Section 7 of this Agreement; and
B.CITY gives CONTRACTOR a written notice to proceed.
C. Should CONTRACTOR begin work in advance of receiving written authorization to proceed, any such professional services are at CONTRACTOR’s own risk.
9.TERMINATION.
A.Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause. Notice of termination will be in writing.
B.CONTRACTOR may terminate this Agreement upon providing written notice to CITY at least thirty (30) days before the effective termination date.
C. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.
D. By executing this document, CONTRACTOR waives any and all claims for damages that might otherwise arise from CITY’s termination under this Section.
10.INDEMNIFICATION.
A.CONTRACTOR indemnifies and holds CITY harmless from and against any claim, action, damages, costs (including, without limitation, attorney’s fees), injuries, or liability, arising out of this Agreement, or its performance. Should CITY be named in any suit, or should any claim be brought against it by suit or otherwise, whether the same be groundless or not, arising out of this Agreement, or its performance, CONTRACTOR will defend CITY (at CITY’s request and with counsel satisfactory to CITY) and will indemnify CITY for any judgment rendered against it or any sums paid out in settlement or otherwise.
B.For purposes of this section “CITY” includes CITY’s officers, officials, employees, agents, representatives, and certified volunteers.
C.It is expressly understood and agreed that the foregoing provisions will survive termination of this Agreement.
-8-
City of Bellflower
Agreement File No. 752.1
MICHAEL BAKER INTERNATIONAL
11.INDEPENDENT CONTRACTOR. CITY and CONTRACTOR agree that CONTRACTOR will act as an independent contractor and will have control of all work and the manner in which is it performed. CONTRACTOR will be free to contract for similar service to be performed for other employers while under contract with CITY.
CONTRACTOR is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees.
Any provision in this Agreement that may appear to give CITY the right to direct CONTRACTOR as to the details of doing the work or to exercise a measure of control over the work means that CONTRACTOR will follow the direction of the CITY as to end results of the work only.
12.NOTICES.
A.All notices given or required to be given pursuant to this Agreement will be in writing and may be given by personal delivery or by mail. Such noticing does not include day-to-day communications between CITY’s and CONTRACTOR’s project managers. Notice sent by mail will be addressed as follows:
If to CONSULTANT:If to CITY:
Attention:Dave Mercier Attention:Len Gorecki
Practice Principal City of Bellflower
5 Hutton Center Drive Suite 500 16600 Civic Center Drive Santa Ana, CA 92707 Bellflower, CA 90706
(714)206-0630 (562) 804-1424, ext. 2259
[email protected] [email protected]
B.When addressed in accordance with this paragraph, notices will be deemed given upon deposit in the United States mail, postage prepaid. In all other instances, notices will be deemed given at the time of actual delivery.
C. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph.
13.TAXPAYER IDENTIFICATION NUMBER. CONTRACTOR will provide CITY with a Taxpayer Identification Number.
14.WAIVER. A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character.
-9-
City of Bellflower
Agreement File No. 752.1
MICHAEL BAKER INTERNATIONAL
15.CONSTRUCTION. The language of each part of this Agreement will be construed simply and according to its fair meaning, and this Agreement will never be construed either for or against either party.
16.SEVERABLE. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect.
17.CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement.
18.WAIVER. Waiver of any provision of this Agreement will not be deemed to constitute a waiver of any other provision, nor will such waiver constitute a continuing waiver.
19.INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County.
20.AUTHORITY/MODIFICATION. This Agreement may be subject to and conditioned upon approval and ratification by the Bellflower City Council. This Agreement is not binding upon CITY until executed by the City Manager. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written agreement. CITY’s city manager may execute any such amendment on behalf of CITY.
21.ELECTRONIC SIGNATURES. This Agreement may be executed by the Parties on any number of separate counterparts, and all such counterparts so executed constitute one agreement binding on all the Parties notwithstanding that all the Parties are not signatories to the same counterpart. In accordance with Government Code §16.5, the Parties agree that this Agreement, agreements ancillary to this Agreement, and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a party is delivered by electronic transmission. Such electronic signature will be treated in all respects as having the same effect as an original signature.
22.EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of this Agreement, its attachments, the purchase order, or notice to proceed, the provisions of this Agreement will govern and control.
23.CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement. -10-
City of Bellflower
Agreement File No. 752.1
MICHAEL BAKER INTERNATIONAL
24.FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood, explosion, war, terrorist act, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties’ control, then the Agreement will immediately terminate without obligation of either party to the other.
25.ENTIRE AGREEMENT. This Agreement and its attachment(s) constitutes the sole agreement between CONTRACTOR and CITY respecting Caruthers Park Stormwater Capture Maintenance Services. To the extent that there are additional terms and conditions contained in the exhibit(s) that are not in conflict with this Agreement, those terms are incorporated as if fully set forth above. There are no other understandings, terms or other agreements expressed or implied, oral or written.
IN WITNESS WHEREOF the parties hereto have executed this Agreement the day and year first hereinabove written.
CITY OF BELLFLOWER MICHAEL BAKER INTERNATIONAL
_______________________________________________________ Ryan Smoot, City Manager Dave Mercier, Practice Executive ATTEST:
___________________________Taxpayer ID No.______________ Mayra Ochiqui, City Clerk
APPROVED AS TO FORM:
___________________________
Karl H. Berger, City Attorney
ATTACHMENT:
Exhibit A – Scope of Work
-11-
5 Hutton Centre Drive, Suite 500 | Santa Ana, CA 92707
Office: 949-472-3505 | Fax: 949-472-8373 | mbakerintl.comMBAKERINTL.COM
EXHIBIT A
March 25, 2025
Proposal for Assessment of Design, Operations, Maintenance, and Performance of Ruth R.
Caruthers Park Regional Stormwater Capture and Infiltration Project This proposal presents task descriptions and associated costs for Michael Baker International and its subcontractors (collectively Michael Baker) to support the City of Bellflower with an in-depth operational assessment of the Ruth R. Caruthers Park Regional Stormwater Capture and Infiltration Project (Project) which was constructed in 2019-20 and currently has significant operational constraints. The purpose of the assessment will be to:
·Conduct an initial assessment comprising of:
o Summary of existing Project performance data on flows captured and pollutant loading reductions attained during periods of prior operation and at a watershed data collection scale;
o Conduct an initial physical inspection of the underground capture system; ·Evaluate engineering plans to identify potential deficiencies, needed enhancements, and costs. ·Review the operating environment in the Los Angeles County Flood Control District’s (LACFCD) facilities supplying water to the Project;
·Evaluate SCADA monitoring/controls and needed upgrades to inform the City of Bellflower and operators of the Project on system status and remote operability; and ·Compile information into a summary report with a recommended prioritization and phasing of activities along with associated costs for consideration relevant to the City of Bellflower’s maintenance funding.
In completing the assessment Michael Baker will be mindful of the design objectives that call for the elimination of dry weather flows and maximizing wet weather pollutant removal but will temper these expectations with the recognition that funding for operations and maintenance through the Safe Clean Water Program is limited. The five-year cycle of operations and maintenance allocated for this project beginning November 2020 is approximately $150,000 per year. The task elements will utilize existing data and assessments, such as the Craftwater Engineering April 2024 memo, to the extent possible, to streamline and reduce duplication of work.
The assessment does not include cleaning and testing of project facilities and components, since pricing for these elements cannot be generated until the inspections in this proposal are completed. Incidental removal of some accumulated sediment in the underground capture system may, however, be needed to access and photo-document certain Project areas.
Chris Crompton will serve as Program Manager for Michael Baker. Pacific Advanced Civil Engineering, Inc., (PACE), Mladen Buntich Construction Company’s (Buntich), PERC Water Corporation (PERC), and Downstream Services, Inc. (DSI) are team members and will assist Michael Baker in completing this work. -12-
Michael Baker We Make a Difference
INTERNATIONAL
MiChael Baker We Make a Difference
INTERNATIONAL
Task 1 -MeeƟngs and Project Management
This task entails rouƟne project management, including monthly invoice preparaƟon, budget tracking, and as needed meeƟngs and coordinaƟon with the City of Bellflower, either telephonically or in coordinaƟon with on-site work, to ensure and report on progress. Three meeƟngs are esƟmated over the period of work. Michael Baker will schedule these meeƟngs as agreed upon by the City.
Task 1 Deliverables:Project management and progress meeƟng coordinaƟon.
Task 1 Total – $5,200
Task 2 – Initial Engineering Assessment of Project’s Underground Capture System Task 2.1. Existing Records Assessment
This subtask will review existing record documents and operating data to determine a baseline for the condition assessment in Task 2.3. Data gaps will be identified and, if necessary, protocols will be developed to obtain the necessary data. Data required for analysis include:
·Facility record drawings
·Facility design reports or basis of design
·Permits and/or jurisdictional agreements between stakeholders ·Available operation and maintenance manuals
·Maintenance/Equipment replacement logs
Task 2.1 cost - $3,480.00
Task 2.2 Summarize ExisƟng Project Performance Data
This subtask will evaluate, to the extent possible, data on flows captured and pollutant loading reduced during periods of the Project’s prior operaƟon, including:
·Influent and effluent flow data
·Influent loading for required TMDL constituents
·Effluent goals or requirements
·Effluent or Product Water quality results
The assessment will compile saved operaƟonal informaƟon from the City of Bellflower and Lakewood, the SCADA system, and available monitoring data from samples taken within the Project, the watershed tributary, and downstream of the Project.
The subtask goal is to understand the current value of the Project with respect to the water volume captured, the quanƟƟes of pollutants removed, parƟcularly with respect to Total Maximum Daily Load (TMDL) consƟtuents, and the amount of irrigaƟon water created. The subtask will help to establish a baseline to measure future enhancements and opƟmizaƟons idenƟfied in Task 3 below and inform the appropriate level of data collecƟon needed going forward.
Task 2.2 cost - $5,900.00
-13-
Michael Baker We Make a Difference
INTERNATIONAL
MiChael Baker We Make a Difference
INTERNATIONAL
Task 2.3 Investigate Underground Capture System
This subtask will conduct inspections of the underground capture system using a confined space entry crew to investigate below grade structures. The focus will be to visually verify below grade sensors, pumps, piping, drains, inlets, etc. with Michael Baker team engineers being part of the inspection.
This subtask goal will evaluate if the critical components are intact and debris free and whether the capture system is in need of cleaning for testing in Task 4 and subsequent proper operation. The volume of material for removal will be estimated and preliminary work plans will be developed on how this will be accomplished, and budgetary pricing for the removal if required.
Inspection estimates are based on the following schedule:
Includes:
·8-hour shifts on the project
·1 Operator foreman
·1 Operator
·4 Laborers
·1 foreman truck with confined space entry equipment
·Union signatory operators and labor
Task 2.3 Deliverables:Photos of existing conditions and workplan/estimates for material removal Task 2.3 cost - $44,670.00
Task 2.3 Contingency
Due to the considerable uncertainty of what may be encountered in the underground capture system and the potential need for additional work to assess and complete documentation of components, three additional days are included as a contingency, and would be subject to City of Bellflower approval if needed.
Task 2 Deliverables: Subtask summaries and photo-documentaƟon for inclusion in Task 4 report.
Task 2 Total (excluding contingency) - $54,050.00
Task 2.3 contingency - $29,250
-14-
Michael Baker
INTERNATIONAL
We Make a Difference
F” Mafia,
‘Slluculre 0 Station ”line On
Mobilization and Set Up 1
Storm Water Capture Basin Manhole - Sediment Basin N 177867789 0.5 Storm Water Capture Basin Manhole - Stormwater Capture Tank N 177862950 0.5 Storm Water Capture Basin Manhole - Sediment Basin N1778388.25 0.5 Storm Water Capture Basin Manhole -Stomiwater Capture Tank N1778452.58 0.5 SDays
Michael Baker
INTERNATIONAL
We Make a Difference
V Intestinal
Me I) Station The m
Mobilization and Set Up 1
Storm Water Capture Basin Manhole - Sediment Basin N 177867789 0.5 Storm Water Capture Basin Manhole - Stormwater Capture Tank N 177862950 0.5 Storm Water Capture Basin Manhole - Sediment Basin N1778388.25 0.5 Storm Water Capture Basin Manhole -Stormwater Capture Tank N1778452.58 0.5 SDays
Task 3 – Assessment of Design and OperaƟons of Project
Task 3.1 Evaluate Project Engineering Plans
Based on Task 2, this sub task will assess the as-built plans for the Project in order to understand the Project’s design and affirm or idenƟfy enhancements or operaƟonal alternaƟves in the following areas:
·Appropriate sizing of Project components;
·Ability to isolate Project from channel/storm drain inputs; ·Suitable access to underground aspects of the Project; ·Viability of the infiltraƟon elements;
·Viability of the WAHASO system; and
·AlternaƟves to the WAHASO system, including discharge to the Los Coyotes Water goal is to provide a Project operaƟonal understanding and idenƟfy potenƟal correcƟve acƟons and costs needed in order to have an operable Project.
Task 3.1 cost - $26,040.00
Task 3.2 Review OperaƟng Environment in LACFCD’s Supplying FaciliƟes This sub task will assess issues in LACFCD Channel BI 0016 and LACFCD Project No. 1902, Line A that could introduce excess pollutants and sediment loading and impact the performance of the Project, including:
·Available flow gauge data;
·Available water quality data;
·PermiƩed discharges of non-stormwater in the tributary area such as well purging, environmental clean-ups, etc.; and
·Channel and storm drain cleaning protocols, frequencies, and drainage area data.
The subtask goal is to idenƟfy potenƟal measures that could reduce or eliminate pollutants or conveyors of pollutants, such as sediment, into the Project and improve Project operaƟon and effecƟveness.
Task 3.2 cost - $5,300.00
Task 3.3 Evaluate SCADA Monitoring/Controls
This sub task will evaluate the SCADA monitoring/controls for the Project, which currently reside with the City of Lakewood, to determine their current operability and value. To the extent needed, the sub task will determine steps and enhancements required to make them available to the City of Bellflower and provide oversight of the Project on an ongoing basis.
The subtask goal is to idenƟfy potenƟal correcƟve acƟons, enhancements and associated costs needed to the SCADA monitoring/controls to support an operable Project.
Task 3.3 cost - $4,080.00
-15-
Michael Baker We Make a Difference
INTERNATIONAL
MiChael Baker We Make a Difference
INTERNATIONAL
Task 3 deliverables:Subtask summaries for inclusion in Task 4 report.
Task 3 Total - $35,420.00
Task 4 – Summary Report on Project CondiƟons and OpƟmizaƟon The products of Task 2 and 3 will be compiled into a summary report and include recommended prioriƟzaƟon and phasing of acƟviƟes that matches the City of Bellflower’s available budget. Some of the key assessments will include determining:
·Whether modificaƟons should be pursued in the Project drainage area with LACFCD to reduce pollutant loading to the Project and improve the Project’s operability and effecƟveness; ·Whether maintenance funding allows support of wet weather capture in addiƟon to dry weather; ·Project repairs and cleaning needed and costs. It should be noted that full component tesƟng is part of next proposed phase;
·Project improvements recommended and a prioriƟzed phasing; ·Whether the WAHASO system can be made operable and cost effecƟve and under what constraints.
·PotenƟal alternaƟves management strategies for the captured water; ·AddiƟonal operaƟonal and monitoring data needed to manage and assess performance of the Project; and
·Changes needed in the O&M manual.
Task 4 Deliverable:Summary Report on Project CondiƟons and OpƟmizaƟon.
Task 4 Total - $12,300
Task Sub Task Cost Task Cost
Task 1 -Meetings and Project Management $5,200.00
Task 2 -Initial Engineering Assessment of Project’s Underground Capture System
$54,050.00
Task 2.1. Existing Records Assessment $3,480.00
Task 2.2 Summarize Existing Project Performance Data $5,900.00 Task 2.3 Investigate Underground Capture System $44,670.00 Task 3 -Assessment of Design and Operations of Project $35,420.00 Task 3.1 Evaluate Project Engineering Plans $26,040.00
Task 3.2 Review Operating Environment in LACFCD’s Supplying Facilities
$5,300.00
Task 3.3 Evaluate SCADA Monitoring/Controls $4,080.00
Task 4 –Summary Report on Project Conditions and Optimization $12,300.00 Proposal Cost $106,970.00
Task 2.3 conƟngency $29,250.00
Proposal Cost with conƟngency $136,220.00
Estimated completion date – 12 weeks from approval of contract -16-
Michael Baker We Make a Difference
INTERNATIONAL
MiChael Baker We Make a Difference
INTERNATIONAL
Adriana Figueroa (Paramount), Board Chair • Kelli Pickler (Lakewood), Vice-Chair • Thomas Bekele (Signal Hill), Secretary/Treasurer Proudly serving Gateway cities and agencies in Southeastern Los Angeles County
Members: Artesia · Bell · Bell Gardens · Bellflower ·Central Basin Municipal Water District · Cerritos · Commerce · Compton · Cudahy · Downey Hawaiian Gardens ·Huntington Park · La Mirada · Lakewood · Long Beach · Long Beach Water Department · Lynwood · Maywood · Montebello · Norwalk · Paramount Pico Rivera · Port of Long Beach · Santa Fe Springs · Signal Hill ·South Gate · Vernon · Water Replenishment District of Southern California · Whittier
With Technical Support From The Sanitation Districts Of Los Angeles County 16401 Paramount Boulevard
Paramount, CA 90723
562.663.6850 phone
562-634-8216 fax
www.gatewaywater.org
Los Angeles Gateway Region
Integrated Regional Water Management
Joint Powers Authority
October 10, 2024
AGENDA ITEM 7 – Statement of Qualifications (SOQ) for Operations, Maintenance and Evaluation of Regional Stormwater Capture and Treatment Projects
SUMMARY
There are currently five (5) regional projects that are complete or are expected to become operational within this calendar year. Operational and maintenance (O&M) issues are of major concern for these projects. Member agencies of the Los Cerritos Channel, Lower Los Angeles River, Lower San Gabriel River and Lower Los Angeles River Upper Reach 2 Watershed Groups requested GWMA to prepare and release a Request for Qualifications (RFQ) to solicit qualified engineering/contracting firms with stormwater, wastewater or equivalent experience to provide the following services: 1) O&M; 2) remote control and monitoring (SCADA); and 3) and/or evaluation of Regional Stormwater Capture and Treatment Projects to optimize performance as well as construction work that may be needed to achieve that optimization. GWMA would not be contracting directly with the teams. Rather, it would share the solicitation package results with the five regional project leads as well as other GWMA member cities and agencies for each of them to directly solicit proposals and enter into contracts with one or more of the qualified team, if they so choose.
DISCUSSION
An RFQ (attached) was officially released on May 1, 2024 and the Statement of Qualifications (SOQ) being due on June 5 , 2024. However, due to the complexity of the required services and questions received from potential RFQ respondents, an ad hoc committee made up of lead agencies in charge of the five regional projects and GWMA staff determined a need to re-write the RFQ was in order. On July 30, 2024, a new RFQ was released and circulated with an SOQ due date of September 16, 2024.
GWMA received four SOQs (attached), each of which was made up of a Lead Firm and a team of sub-consultant/contractors. GWMA’s consultant, John L. Hunter & Associates reviewed the four SOQs and determined that they all met the minimum requirements/criteria set forth in the RFQ (memo attached).
The four team lead firms are as follows:
• Craftwater
• Geosyntec Engineering
• Michael Baker International
• NV5
-17-
AGENDA ITEM 7
Adriana Figueroa (Paramount), Board Chair • Kelli Pickler (Lakewood), Vice-Chair • Thomas Bekele (Signal Hill), Secretary/Treasurer Proudly serving Gateway cities and agencies in Southeastern Los Angeles County
Members: Artesia · Bell · Bell Gardens · Bellflower ·Central Basin Municipal Water District · Cerritos · Commerce · Compton · Cudahy · Downey Hawaiian Gardens ·Huntington Park · La Mirada · Lakewood · Long Beach · Long Beach Water Department · Lynwood · Maywood · Montebello · Norwalk · Paramount Pico Rivera · Port of Long Beach · Santa Fe Springs · Signal Hill ·South Gate · Vernon · Water Replenishment District of Southern California · Whittier
With Technical Support From The Sanitation Districts Of Los Angeles County Staff is requesting that the board authorize staff to receive and file the SOQs and to distribute the entire RFQ package with John L. Hunter & Associate’s memo to all GWMA Member Cities and Agencies to assist them with pre -qualification information for Stormwater O&M Services. GWMA will not be making recommendations on any of the firms/teams.
FISCAL IMPACT
None.
RECOMMENDATION
a. Receive and File SOQs and direct staff to distribute the complete RFQ/SOQ Package to each of the GWMA member cities and agencies with no recommendation.
ⴱ㠭
-19-
MUNiCIPAL CONTRACTOR
TECHNICAL MEMORANDUM DATE: September 25. 2024
To: Grace Kast, Executive Officer, Gateway Water Management Authority FROM: John Hunter fig
SUBJECT: Evaluation of 4 Statements of Qualification
RFQ for Operation and Maintenance of Regional Stermwate‘r Projects” JLHA has competed it’s review of the four responding firms:
0 Craftwater,
o Geosyntec,
- Michael Baker International.
- NVS.
Evaluation Summary
All four firms have offices in Southern California and personnel and team members with decades of stormwater knowledge and experience. All the firms have five years of experience within the stormwater field. One firm was formed in 2019, but nonetheless did meet the requisite experience criteria.
Regional Projects that will require Operations and Maintenance with specific applicability to this RFQ have only recently begun to come online and the opportunities for firms to have had actual Operations and Maintenance experience with large regional stormwater projects is limited.
Therefore, the criteria for “experience” were broadly interpreted to include regional projects, sewerage treatment pla nts, stormwater infiltration ponds, large privately owned treatment systems such as those found at General Industrial Permitted sites (ex: airports), etc. All four firms and their subcontractor teams were deemed to meet the criteria of Operation and Maintenance experience with two or more major projects.
The responding firms and their subcontracting teams demonstrated adequate understanding of the, goal of the RFQ and the ability to provide the necessary services. However, while all firms indicated familiarity with SCADA, it was not generally clear if these firms could provide off-site monitoring and control and that, if applicable, should be followed-up on by individual agencies when moving forward to the next phase of any selection process.
in summary, all four responding firms have meet the RFQ Criteria.
Fags-.1 m
John L. Hunter 81 Associates, Inc.
6131 Orangethorpe Ave, Suite 300, Buena Park, CA 90620
MUNICIPAL CONTRACTOR
TaccAjL MEMORANDUM DATE: septemb-er'zazoaa.
TO: Grace Kas‘t, Executive Officer, Gateway Water Management Authority FROM: John Hunter M
SUSIEGT: Evaluation of 4 Statements of Qualification
RFQ for Operation and Maintenance of Regional Stormwatsr Projects iLHA has competed it’s review of the four responding firms:
- Craftwatar,
o Geosyntec,
- Michael Baker International,
I NV5.
Evaluation Summary
All four firms have offices in Southern California and personnel and team members with decades of stormwater knowledge and experience. All the firms have five years of experience within the stormwater field. One firm was formed in 2019, but nonetheless did meet the requisite experience criteria.
Regional Projects that will require Operations and Maintenance with specific applicability to this RFQ have only recently begun to come online and the opportunities for firms to have had actual Operations and Maintenance experience with large regional stormwater projects is limited.
Therefore, the criteria for “experience” were broadly interpreted to include regional projects, sewerage treatment pla nts, stormweter infiltration ponds, large privately owned treatment systems such as those found at General Industrial Permitted sites (ex: airports), etc. All four firms and their subcontractor teams were deemed to meet the criteria of Operation and Maintenance experience with two or more major projects.
The responding firms and their subcontracting teams demonstrated adequate understanding of the goal of the RFQ and the ability to provide the necessary services. However, while all firms indicated familiarity with SCADA, it was not generally clear if these firms could provide off-site monitoring and control and that, if applicable, should be followed-up on by individual agencies when moving forward to the next phase of any selection process.
in summary, all four responding firms have meet the'RFQ Criteria.
Pegged of 1
John L. Hunter 8!. Associates, Inc.
6131 Orangethorpe Ave, Suite 300, Buena Park, CA 90620
REQUEST FOR QUALIFICATIONS
Notice is hereby given that Statement of Qualifications (SOQs) will be received from firms for Operations, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects.
Responding firms should have an assembled team with experience or equivalent experience in:
(1) Operations and maintenance of stormwater and/or wastewater capture and treatment systems;
(2) Remote monitoring via SCADA;
(3) Engineering analysis and design of stormwater and/or wastewater capture and treatment systems; and
(4) Construction for repairs and modifications of these types of systems.
Responses to this Request for Qualifications (RFQ) will be accepted until 5:00 PM PDT on Monday, September 16, 2024. It is the responsibility of the respondent to ensure that submitted SOQs have sufficient time to be received prior to the due date and time.
SOQs shall be submitted electronically only. No hardcopies will be accepted.
Proposers shall submit one (1) electronic file (.pdf) of the SOQ via email to:
[email protected].
Late SOQs will not be considered or accepted.
Key RFQ Dates (Subject to change at discretion of GWMA):
Release Date July 30, 2024
Questions Due to GWMA August 16, 2024 at 5:00 PM PDT
Posting of the Q&A August 26, 2024
SOQ Due Date September 16, 2024 at 5:00 PM PDT
SOQ Review September 24,2024
Presented to GWMA Board October 10, 2024
-20-
EMU} Paramount Bauleuard WW‘N.E_JllE‘.‘.'-3‘,W\'Eit-€r WE Paramount. CA 90723
562.663.6350 phone
5624634~8216 fax
J6f6t P6ww3- Authority
Adriana Flam: {auni}. mini-d cnalr- Kill] Picklir MW“), Illa-Chur- Thomas 3mm Hill). WNW UPI-nudist wiring Gateway aides and launch: in Saudis-sum Lns- “Ann-In County mbwArtaan Ball Bailfiar'dani- -Ballfiawir Gentrilfi'ash-I MwfidpaEWEtarnislfid G'arriiqs- Gumm- 66m-- Gudamr W aywaod- Mmtn'bollo- Manual: -w. Wardens Midingiar'i' Pm- L-s Wrath-- Lakmod- Long Bucfi- Long Beach Water Depemeid- Lymood M Plyn Rhgela: Py_I1_ 6! Lynn_ am Sania Fe Swings» Signal Hill :South 6516— Vernon- Water Repleniyh'mam District of 55t Calflomla Whllllfi With Tim Suppnd From W'S‘anfiaflnn m-m‘m-W Cami?
wwwgatewavwater mtg maul Paramount Boulevard
Paramount. CA 90723
562.663.6850 phone
562-634-8216 fax
16in: Power: Authority
Adriana Figueroa (Penman). sure Choir- Kelll Pickle! (Lakewood). Vice-Chain Thms Bakellfilgnel Hill). mar-um Proudly serving Gateway cities and agencies in Southeastern Lee Anne!” County MMAMI: Bell MGerdemi- Bellfluwer Centreifiesh MmidpaiWaterDisuid cerfitqs- Gumm- Comm-- mem- WW Pect- -LeMirede- Lekmod- Long Beech- Long Beach Water Depamsnt- Lyn-wood Maywaod- Mmfibeuo- Hm -m- Plea Rivere PorIeILennBemh Santa FeSprtngs Signal Hill -Southeate Vernon WeterReplaniehmerflDistrictomnhemcalflomle- Whltfler With Technical Support From The Seniafim Weevil.“ Angela County
Contents
1. INTRODUCTION AND SUMMARY .................................................................................................. 1
2. BACKGROUND ............................................................................................................................ 1
3. STEP 1 – PREQUALIFICATION PROCESS ....................................................................................... 1
3.1. SUBMITTAL REQUIREMENTS ...................................................................................................... 1
4. STEP 2 – PROPOSAL AND CONTRACT PROCESS (NOT INCLUDED AS PART OF THIS SOQ PROCESS) 4
5. RFQ CONTACT ............................................................................................................................ 4
6. SCHEDULE ................................................................................................................................. 4
7. QUESTIONS REGARDING THE RFQ ............................................................................................... 4 ATTACHMENT 1 – PROJECT SUMMARIES .............................................................................................. 5
1. Bolivar Park .............................................................................................................................. 6
2. Mayfair Park ............................................................................................................................ 10
3. Ruth R Caruthers Park ............................................................................................................. 14
4. Sub Basin 4 ............................................................................................................................. 17
5. Urban Orchard ........................................................................................................................ 21 ATTACHMENT 2 - ILLUSTRATIVE SCHEMATIC FOR EACH OF THE PROJECT SITE ................................... 24 ATTACHMENT 3 - PHOTOS OF EXISTING O&M EFFORTS (PLASTIC BAGS IN PUMPS, SLUDGE IN STORAGE VAULTS, ETC.) .................................................................................................................................. 30 ATTACHMENT 4 - LINKS TO O&M MANUALS ....................................................................................... 32 ATTACHMENT 5 - BMP ENGINEERING RECOMMENDATIONS ............................................................... 33 ATTACHMENT 6- SCADA IMAGES ....................................................................................................... 34
-21-
@WM ®wmm
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 1
1. Introduction and Summary
The GWMA, a California joint powers authority, on behalf of the member agencies of the Los Cerritos Channel, Lower Los Angeles River, Lower San Gabriel River, Lower Los Angeles River and Upper Reach 2 Watershed Management Groups, is releasing this Request for Qualifications (RFQ) to solicit qualifications from engineering/contracting firms with stormwater, wastewater or equivalent experience.
The purpose of this RFQ is to assist the GWMA member agencies in directly contracting with a qualified firm(s) to provide the following services: 1) Operations and Maintenance, 2) remote control and monitoring (SCADA); and 3) and/or evaluation of Regional Stormwater Capture and Treatment Projects to optimize performance as well as construction work that may be needed to achieve that optimization.
SOQs will be received from firms with stormwater and/or wastewater or equivalent experience.
This RFQ is Step 1 of a two-step selection process. This RFQ process does not include Step 2 as described below.
Step 1: GWMA is requesting qualifications and will conduct an initial screening of submittals received.
Based on the initial screening, GWMA will establish a list of pre-qualified firms. Multi-firm teams will be considered, but the SOQ must be submitted under one lead firm.
Step 2: The list of the pre-qualified firm or firms will be made available to individual GWMA member agencies. Those member agencies with jurisdiction over regional projects may then take a separate action to select pre-qualified firm(s), request specific proposal(s), and negotiate and award contract(s) for requested activities.
2. Background
There are currently five (5) regional projects that are complete or are expected to become operational within this calendar year. These five projects have immediate applicability to this RFQ and are Bolivar Park, Ruth R. Caruthers Park, Mayfair Park, Sub-Basin 4 (located at the Long Beach Airport), and Urban Orchard. An additional twelve (12) regional projects are anticipated to be constructed over the next ten to twelve years and the pre-qualification list may be used by the GWMA member agencies to select firms to assist with operations and maintenance. These projects are Hermosillo Park, El Dorado Park, Furman Park, Spane Park, John Anson Ford Park, Apollo Park, Independence Park, Cerritos Sports Complex, Lynwood City Park, Heartwell Park, Skylinks Golf Course, and Salt Lake Park.
Summaries of recent operations and maintenance work for the five regional projects are attached in Attachment 1. The additional information is being provided to describe the anticipated scope of services which may be requested by GWMA’s member agencies during Phase 2 of this process.
3. STEP 1 – PREQUALIFICATION PROCESS
3.1. SUBMITTAL REQUIREMENTS
GWMA will not specify the format or organization of the SOQ but at a minimum should include the following:
• Qualifications/Experience
Firms submitting an SOQ shall be a qualified California-licensed Contractor or Engineering/Contracting firm with a minimum of 5 years of experience with stormwater , or -22-
@WM @WM
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 2 wastewater or equivalent projects of similar size and complexity. The responding firms shall provide enough detail in their response to enable GWMA and the jurisdictional municipalities to evaluate the ability of the firm to meet or exceed the minimum requirements herein, and perform the Services described in a professional, high-quality manner. o Responding firms shall provide prior experience history and qualifications in providing like services in a similar environment
▪ A minimum of 2 projects of similar size and complexity ▪ Brief description of each project
▪ Record of completing project components on schedule
▪ Reference contact information
o Strength and stability of the firm, as demonstrated by financial statements. • Organizational Chart/Team Members
The professional, technical and managerial qualifications and experience of personnel named in the SOQ, including the proposed Project Manager(s); previous relevant experience which demonstrates capability to successfully manage work; years of experience; extent of experience applicable to this work; experience in key staff positions; experience in successfully managing work schedules and controlling costs; qualifications of principals and associates; team organization.
• Approach and Understanding
The SOQ should demonstrate a clear understanding of requirements and address all SOQ requirements adequately. For the establishment of the list of pre-qualified firms in this Step 1, below is an estimated scope of services. It is preferred that the responding firm and their team have demonstrable experience and ability to carry out services in all four categories below. o Operation and Maintenance (O&M) – O&M of regional stormwater capture infrastructure systems (regional projects), which have been designed to reduce the level of pollutants in urban and stormwater runoff primarily through sediment and trash removal and i n some cases filtration. Responding firm(s) should anticipate being responsible for maintaining the equipment, including but not limited to: sensors, monitors, pumps, valves, removing sediment and trash from structures, control systems, water harvesting systems and other equipment as necessary as well as adherence to Los Angeles County Flood Control District, Sanitation Districts of Los Angeles County, and Public Health Department permits. This includes influent, effluent and other water stream monitoring as required by permits or as necessary for optimum operation of the system. The responding firm should identify one person(s) who will provide part-time administrative assistance (e.g., preparation of compliance reports, correspondence, etc.) to support a regional project’s performance as reasonably needed. The SOQ should describe the identified individual’s experience and qualifications (no specific criteria are established by this RFQ). The SOQ should also identify at minimum one person who will provide part-time maintenance and support services for the regional project(s). Persons with electro-mechanical, electrical, and instrumentation service backgrounds preferred.
o SCADA – All five regional projects are equipped with SCADA to remotely monitor and control the regional project(s) systems. The responding firms must demonstrate experience and ability to conduct offsite monitoring and control via SCADA. -23-
@WM @WM
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 3 o Engineering and Technical Services – From time to time, the member agencies may require engineering design, evaluation and technical support services for design and implementation generally assumed to be less than $250,000 although that is subject to change at the discretion of the applicable member agency. Should a responding firm have the ability to provide such professional engineering support on a Time and Materials basis, that should be stated in the SOQ along with a list of the types of support that can be accommodated.
o Construction/Repair – From time to time, the member agencies may require construction services such as repairs and replacement of diversion systems, pumps, valves as well as access to underground structures necessitating confined space entry. The responding firms must provide their team’s experiences with projects of this nature.
At the discretion of GWMA, additional information may be requested and evaluated, and interviews may be conducted.
Pre-qualified firms shall be selected based on the following criteria:
• Relevant experience and client references
• Organizational chart and team members
• Demonstrated approach and understanding of the scope of work.
Proposers shall submit one (1) electronic file (.pdf) SOQ not exceeding 15 MB via email to [email protected]. Hard copies will not be accepted. Respondents may attach links to larger documents referencing experience. GWMA and its member agencies are not responsible for transmission difficulties.
SOQs must be submitted electronically before 5:00 PM PDT on September 16, 2024.
Gateway Water Management Authority
Attention: Madeline Anderson
Email address: [email protected]
Subject Line: GWMA O&M SOQ
SOQs received after the SOQ deadline will not be opened or considered. Hard copies will not be accepted or considered.
If the GWMA’s Executive Officer, in the Executive Officer’s sole discretion, believes there is a need for clarification, the Executive Officer will issue an Addendum. GWMA shall make any changes to the requirements of this RFQ by written addenda only. Changes to the RFQ will be posted on GWMA’s website ( www.gatewaywater.org) under “GWMA News”.
It is the responsibility of the responding firms to ensure that any questions or submissions have sufficient time to be received prior to the due date(s) and time. GWMA is not responsible for errors of any transmissions. An incomplete SOQ or a SOQ that does not conform to the requirements at GWMA’s sole discretion will not be considered. Issuance of this RFQ does not obligate GWMA or member agencies to award a contract. GWMA is not liable for any of the responding firm’s costs to prepare and submit the SOQ.
-24-
@WM @WM
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 4
4. STEP 2 – PROPOSAL AND CONTRACT PROCESS (NOT INCLUDED AS PART OF THIS SOQ
PROCESS)
The list of the pre-qualified firm(s) will be made available to each jurisdictional member agencies, many of which have jurisdiction over one or more of the regional projects. Those member agencies may then take a separate action to select pre-qualified firm(s), request specific proposal(s), and negotiate and award contract(s) for requested activities. At that time, pre-qualified firm(s) will be provided with more detailed scopes of work for the individual regional projects. Firms may be asked to provide all or specific limited tasks at the discretion of the member agency. The contracting agency may request the selected firm to be responsible for obtaining all necessary permits, including access permits from LACFCD.
5. RFQ Contact
All questions are to be directed to the RFQ contact person:
Gateway Water Management Authority
Madeline Anderson
[email protected]
Subject: GWMA O&M RFQ
6. Schedule
• RFQ released: July 30, 2024
• Deadline for receiving questions: August 16, 2024 at 5:00 PM PDT • Response to questions: August 26, 2024
• SOQ due: September 16, 2024 at 5:00 PM PDT
• SOQ Review: September 24, 2024
• Presented to GWMA Board: October 10, 2024
GWMA reserves the right to make changes to the above schedule at the discretion of the GWMA and/or its jurisdictional member agencies.
7. Questions Regarding the RFQ
Any questions will need to be submitted electronically to the RFQ contact person by the deadline specified on the front page and Section 6, “Schedule” of this RFQ.
Responses to questions will be posted on GWMA’s website ( www.gatewaywater.org) home page under “GWMA News” on the date specified on the front page and Section 6, “Schedule” of this RFQ.
GWMA shall not be responsible for failure to respond to a question or request for clarification and/or comment that has not been properly labeled. Questions received after the stated deadline will not be answered.
-25-
@WM @WM
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 5 Attachment 1 – Project Summaries
-26-
@WM @WM
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 6
1. Bolivar Park
a. Located at:
3300 Del Amo Blvd
Lakewood, CA 90712
b. The Bolivar Park Regional Stormwater Project is located in the Bolivar municipal park in the City of Lakewood. Underlying a significant portion of this park is a 7.5 ac-ft subsurface storage and infiltration system. Wet and dry weather flows are diverted from a nearby LACFCD 48” Reinforced Concrete Pipe (RCP) channel. This regional project’s major components include:
● Rubber diversion dam (base raised 3”)
● Grated drop inlet and diversion valve
● Nutrient Box pretreatment unit
● Pump Station with 4 pumps
● 8.9 ac-ft subsurface storage and infiltration gallery ● Wet well with 3 pumps
● Water harvesting unit (WAHASO) with connection to the Park’s irrigation system ● Overflow discharge pump back to the Flood Control System ● Water harvesting system
● Discharges to Flood Control System
c. Anticipated Scope of Service
Note that this project originally had an infiltration component, but the infiltration rates have significantly decreased and this will now be operated primarily as a storage and settling vault. -27-
@WM @WMQ
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 7 Bolivar Park Project Operation and Maintenance
# Task Name Description Inspection
Frequency
Cleaning/ replacement
Frequency Notes
1a
Diversion
Structure and
Rubber Dam
Rubber dam raised
to capture water,
lowered to flush trash
and algae.
Before and after rain
events and 1x per
month minimum.
1x per month during the
wet season 1x per qtr.
during dry season.
- Rubber dam has a 3-inch lip, so there's problems
with mosquitoes in the stagnant water. The system
manager usually needs to flush the water.
-System does not usually have enough dry weather
flow, so system manager may need to accumulate
flow until there is enough.
- Channel may fill with trash and debris, needs to
be cleared 1x per month with vacuum.
1b
Diversion
Structure and
Rubber Dam
TSS sensor
Before and after rain
events and 1x per
month minimum.
Cleaning as needed.
TSS sensor monitoring inlet flows is not working
and needs to be repaired or replaced (Responding
firm needs to specify replacement model and costs
including installation labor).
2a
Motor
Operated
Valve
Regulates flow, knife-
gate valve 1x per month Cleaning quarterly
minimum.
This knife-gate valve is in a vault 25 feet below the
surface in a confined space. It is currently unable
to be closed through SCADA. The valve does not
shut properly, resulting in leaking.
3 Pre-Treatment
Unit
Bio Clean Nutrient
Separating Baffle
Box (NSBB) is the
first point of
treatment.
After major storm
events or 1x per
month during wet
season (whichever is
more frequent), and
once during dry
season.
4x per year
-This unit has been Retrofitted to reduce bypass
and the unit can be difficult to clean out.
Prospective respondents are advised that previous
maintenance efforts have experienced
accessibility, lighting, and ventilation issues.
- Estimated 38 cubic yards will be removed for
cleaning.
-28-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 8 Bolivar Park Project Operation and Maintenance
# Task Name Description Inspection
Frequency
Cleaning/ replacement
Frequency Notes
4 Inlet Pump
Station
High flow pump
discharges during
storm events. Low
flow pump only
discharges dry
weather flows and
operates more
frequently.
Clean and inspect
before and after
every rain event and
every 6 months
minimum.
Clean after every rain
event and replace as
needed.
Due to low dry-weather flows not activating pumps.
Pumps need to be cycled regularly.
5 Subsurface
Settling and
Infiltration
Gallery)
Sediment and debris
are carried over the
weir wall before full
settling.
2x per year at the
start and end of the
rainy season.
1x per year
- Prospective respondents are advised that there
are accessibility, lighting, and ventilation issues.
- Hard to maintain and clean due to 1) lack of
ventilation, 2) length of vacuum truck hose, 3) lack
of access manholes, and debris that bypassed the
settling basin.
- Infiltration is not working due to fine sediment
plugging infiltration pores.
6 Motor
Operated
Valve
An actuated valve
connected from
infiltration area that
allows water to move
into wet well to be
pumped to
stormwater
harvesting system or
back to the channel.
Before and after rain
events and 1x per
month minimum.
As needed, quarterly
minimum.
- Not working remotely, only operated manually - in
a confined space.
- The valve vault and electrical box accumulates
water, shortening the electrical system and
corroding wiring from box down to valve.
-29-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 9 Bolivar Park Project Operation and Maintenance
# Task Name Description Inspection
Frequency
Cleaning/ replacement
Frequency Notes
7 Multi-Media
Stormwater
Harvesting
Facility
(WAHASO
System)
There are 4 stages:
1) self-backwashing
Tekklen filters,
2) bag filters,
3) activated carbon
filter media, and
4) ultraviolet (UV)
treatment. City
evacuates storage
water to infiltration
area when bacteria
exceedances occur-
happens often and
WAHASO hasn't
been operational
since June 2022.
Valves are
hydraulically (water)
operated.
Inspection shall occur
monthly at minimum,
or more frequently if
needed and include:
filter bags, UV bulbs,
and sampling.
Every other day during
wet weather, not in use as
of now. Filter Bags should
be replaced 1/day during
wet weather, UV bulb: 1/yr
or as needed, per
sampling plan.
NOTE: City staff is expending a considerable
effort to maintain the water harvesting system.
Concurrent with starting O&M, the selected firm
shall provide an evaluation of the potential for:
● continued operation of the water
harvesting unit or
● converting to a ultra-filtration SB-966
compliant system
● or permanently taking the water
harvesting system offline.
- Bag filters clogged frequently.
- Media is approx. 1/3 of the intended size system
continues to have poor water quality and can't UV
treat.
- Turbidity sensor and flow meter are broken, pH
sensor needs recalibration, intake filters have
failed, and mechanical issues with irrigation pumps
not sending water to WAHASO (likely due to
clogging).
- Media in the vessels is approaching its end-life
and needs to be replaced.
- Operators will consider the option of diverting
captured flow to sanitary sewer for treatment.
8 Irrigation
Pump and
Discharge
Pump
Pumps B1 and B2
deliver water to
harvesting facility. A
separate ejector
pump (B3)
discharges up to
5 cfs to FCD drain.
1x per month As needed
- Problem is that high salt content causes
sprinklers to breakdown quickly.
- Reclaimed water is directed back to the storage
gallery if it fails to pass the BacT test. Two pumps
have been replaced in wet well. Cages installed to
protect irrigation pumps.
-30-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 10 d. Recommendations to Improve Bolivar Park Operations and Maintenance Within one year of beginning operations, the selected firm shall provide recommendations and estimated costs for operational and structural improvements, including improvements to the infiltration aspects that can be made to operate this regional project in a more cost-effective manner while maintaining the goal of improving the quality of urban and stormwater runoff in the main channels. The jurisdictional municipality reserves the right to select another firm to install any recommended improvements. A preliminary report to this effect is included in Attachment 5.
2. Mayfair Park
a. Located at
5720 Clark Ave
Lakewood, CA 90712
b. The Mayfair Park Regional Stormwater Project is located in the Mayfair municipal park in the City of Lakewood. Similar to Bolivar, underlying a significant portion of the park is a 13.8 ac-ft underground stormwater capture and infiltration facility.
The regional project receives both wet and dry weather flows from a diversion structure, located in a nearby covered LACFCD Reinforced Concrete (RC) Channel (23’W x 11”-6’H). The regional project’s major components include:
● 23’W x 3’H Rubber Diversion dam
● Grated drop inlet and Diversion valve
● Pretreatment unit
● 13.8 ac-ft subsurface storage unit
● Outlet valve and a wet well with 3 pumps
● Water harvesting unit (WAHASO) with connection to the Park’s irrigation system ● Kraken discharge treatment unit
● Back-up Sanitary discharge line (The city has obtained a discharge permit from the Sanitation Districts) ● Treatment unit building with RC Controls
c. Anticipated Scope of Service
Mayfair was intentionally designed as a storage and settling facility, it has no infiltration capacity. -31-
@WM @WMQ
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 11 Mayfair Park Operations and Maintenance
# Task Name Description Inspection
Frequency
Cleaning/ replacement
Frequency Notes
1 Diversion
Structures and
Rubber Dam
a. Air-inflatable rubber dam in Del
Amo Channel).
b. Grated Drop Inlet Diversion
Structure.
Before and after
rain events and
1x per month
minimum.
1x per month during the
wet season 1x per
quarter during dry
season.
- Rubber dam can be retracted to be flush
with the channel floor.
- Channel may fill with trash and debris.
- Last cleaned November 29, 2023.
2 Motor Operated
Valve Regulates flow, knife-gate valve.
Before and after
rain events and
1x per month
minimum.
Cleaning quarterly
minimum.
- Manhole access to both settling and
storage are buried 4 feet under an active
baseball field.
- Access to knife gate is in a manhole with
no ladder installed.
- Knife gate does not fully close, allowing
water to enter NSBB area.
- Maintenance will need to be timed to
avoid active recreation and soil will need
to be replaced.
3 Pre-Treatment
Unit
a. Bio Clean Nutrient Separating
Baffle Box (NSBB) is the first point
of treatment.
b. Has been retrofitted with screen
to reduce larger debris.
After major
storm events or
1x per month
during wet
season
(whichever is
more frequent),
and once during
dry season.
4x per year.
- Accessibility, lighting, ventilation issues.
Unit is approximately 25 feet deep with
narrow accessway.
- No ladder to NSBB.
- The unit is not fully operational, pre-
treatment unit has not been cleaned.
-32-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 12 Mayfair Park Operations and Maintenance
# Task Name Description Inspection
Frequency
Cleaning/ replacement
Frequency Notes
4 Subsurface
Storage Structure
13.8 ac-ft underground storage
reservoir to provide initial detention
before the captured stormwater is
pumped for irrigation onsite or
infiltrated into the underlying soils.
City staff can send water from
storage to the wet well via the
actuated valve.
2x per year at
the start and
end of the rainy
season.
1x per year.
- Top of the access way is buried
approximately 4 feet under a baseball
field. Maintenance will need to be timed to
avoid active recreation periods soil will
need to be replaced and, at a minimum,
hand compacted. No access to settling
basin.
- Hard to maintain and clean due to 1)
lack of ventilation, 2) length of Vactor
truck hose, 3) lack of access manholes,
and debris that bypassed the settling
basin needs to be removed.
- High organic contents/debris impact
harvesting units.
5a Post BMP Pump
Station
Convey the captured stormwater
for treatment and subsequent
irrigation, or for filtration and return
to the Clark Channel. Mayfair has
no infiltration, only settling and
storage.
After major
storm events or
monthly during
wet season and
once per dry
season.
Clean annually in
advance of wet season
and replace every 20
years.
Exercise monthly during dry season.
5b Motor Operated
Valve
An actuated valve connected to
infiltration area allows water to
move into wet well, to be pumped
to stormwater harvesting system or
back to the channel.
Before and after
rain events and
1x per month
minimum.
As needed, quarterly
minimum.
- Not working remotely, partially works
manually.
- The valve vault and electrical box
accumulates water, shortening the
electrical system and corroding wiring
from box down to valve.
- Suggest a lip above the electric box.
- Mayfair is using compressed air to keep
vessels pressurized. Bolivar is using
water.
-33-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 13 Mayfair Park Operations and Maintenance
# Task Name Description Inspection
Frequency
Cleaning/ replacement
Frequency Notes
6 Stormwater
Harvesting Facility
(WAHASO
System)
a. Nearly identical unit as Bolivar.
4 stages: 1) self-backwashing
Tekklen filters, 2) activated carbon
filter media, and 3) ultraviolet (UV)
treatment.
b. Undergoing final certification
testing for the Public Health
Department. Has yet to go fully
online.
c. Valves are controlled by
compressed air.
Inspection shall
occur monthly
at minimum, or
more frequently
if needed, and,
UV bulbs, and
sampling.
Every other day during
wet weather, not in use
as of now and filter bags
should be replaced once
per day during wet
weather, UV bulb: 1x per
year or as needed, per
sampling plan.
NOTE: City staff is expending a
considerable effort to maintain the
water harvesting system. Concurrent
with starting O&M, the selected firm
shall provide an evaluation of the
potential for:
● Continued operation of the
water harvesting unit or
● converting to an ultra-filtration
SB-966 compliant system or
● permanently taking the water
harvesting system offline.
7 Irrigation Pump
and Discharge
Pump
Pumps are required to convey
captured stormwater for irrigation
or diversion to the stormwater
channel for emergency evacuation.
a. Irrigation use: 2 submersible
pumps capable of 200 GPM to the
irrigation system.
b. Emergency evacuation diversion
to the stormwater channel: 1 duty
pump capable of 3,150 GPM.
1x per month. As needed.
- Mayfair already has a recycling water
irrigation system but is undergoing a test
for County Health to use the collected
water. They are expected to be complete
by the end of 2024.
- Site does have the option for discharge
to the sanitary sewer.
- Reclaimed water is directed back to the
storage gallery if it fails to pass the BacT
test.
d. Recommendations to Improve Mayfair Park Operations and Maintenance Within one year of beginning operations, the selected firm shall provide recommendations and estimated costs for operational and structural improvements, including improvements to the infiltration aspects that can be made to operate this regional project in a more cost-effective manner while maintaining the goal of improving the quality of urban and stormwater runoff in the main channels. The jurisdictional municipality reserves the right to select another firm to install any recommended improvements.
-34-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 14
3. Ruth R Caruthers Park
a. Located at:
10500 Flora Vista St
Bellflower, CA 90706
b. The Ruth R Caruthers Park Regional Project is located at Ruth R Caruthers Park in the City of Bellflower. The park is underlain by a 9 ac-ft stormwater capture and infiltration system. Unlike Bolivar and Mayfair, it diverts wet and dry weather runoff from two LACFCD drains. One diversion point is the 38’W x 9’H channel to the east. The second diversion point is a 72” RCP FCD storm drain located to the south of the project. Existing major infrastructure components include:
FSD Line A (east) FCD 72” RCP
Flush mounted 38’x3’10” rubber dam Rubber dam
Grated drop inlet structure Grated drop inlet structure Diversion valve Diversion valve
Pretreatment unit Pretreatment unit
Storage Infiltration gallery
3-way plug valve
Pump station
Post-treatment system
c. Anticipated Scope of Service
Note that this project originally had an infiltration component, but the infiltration rates have significantly decreased, and this will now be operated primarily as a storage and settling vault. -35-
@WM @WMQ
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 15 Ruth R Caruthers Park Operations and Maintenance
# Task Name Description Inspection
Frequency
Cleaning/
replacement
Frequency
Notes
1 Diversion
Structures (2) and
Rubber Dam
a. Air-inflatable rubber dam (Project
16 Channel)
b. Grated Drop Inlet Diversion
Structure (Project 16 Channel)
c. Junction Drop Inlet Diversion
Structure (72" RCP - BI1902)
Before and after
rain events and
1x per month
minimum.
1x per month
during the wet
season 1x per
qtr. during dry
season.
- Caruthers system rubber dam can be retracted to
be flush with the channel floor.
- Channel may fill with trash and debris and may
need to be cleared 1x per month with vacuum.
2 Motor Operated
Valve Regulates flow, knife-gate valve.
Before and after
rain events and
1x per month
minimum.
Cleaning,
quarterly
minimum.
3 Pre-Treatment
Unit
Bio Clean Nutrient Separating
Baffle Box (NSBB) is the first point
of treatment.
After major
storm events or
1x per month
during wet
season
(whichever is
more frequent),
and once during
dry season.
4x per year.
-Needs to be retrofitted to prevent bypass and unit
can be difficult to clean out.
- Accessibility, lighting, ventilation issues.
4 Subsurface
Storage Structure
(Settling and
infiltration Basin)
a. 9 ac-ft underground storage
reservoir to provide initial detention
before the captured stormwater is
pumped for irrigation onsite or
infiltrated into the underlying soils.
b. City staff can send water from
storage to the infiltration area via
an actuated valve.
After major
storm events or
bi-monthly
during wet
season and 2x
per year at the
start and end of
the rainy
season.
1x per year
cleaning or as
needed.
- Hard to maintain and clean due to 1) lack of
ventilation, 2) length of Vactor truck hose, 3) lack
of access manholes, and debris that bypassed the
settling basin needs to be removed.
- High organic contents/debris impact harvesting
unit.
-36-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 16 Ruth R Caruthers Park Operations and Maintenance
# Task Name Description Inspection
Frequency
Cleaning/
replacement
Frequency
Notes
5 Motor Operated
Valve
An actuated valve connected to an
infiltration area that allows water to
move into a wet well, to be pumped
to a stormwater harvesting system
or back to the channel.
Before and after
rain events and
1x per month
minimum.
As needed,
quarterly
minimum.
6 Stormwater
Harvesting Facility
(WAHASO
System)
a. Nearly identical unit as Bolivar
and Mayfair.
b. 4 stages: 1) self-backwashing
Tekklen filters, 2) bag filters, 3)
activated carbon filter media, and
4) ultraviolet (UV) treatment. City
evacuates storage water to
infiltration area when bacteria
exceedances occur.
c. Valving is controlled
electronically.
Inspection shall
occur monthly
at minimum, or
more frequently
if needed, and
filter bags, UV
bulbs, and
sampling.
Not in use as of
now and Filter
Bags should be
replaced once
per day during
wet weather,
UV bulb: 1x per
year or as
needed, per
sampling plan.
NOTE: City staff are expending a considerable
effort to maintain the water harvesting system.
Concurrent with starting O&M, the selected firm
shall provide an evaluation of the potential for:
● Continued operation of the water
harvesting unit or
● converting to an ultra-filtration SB-966
compliant system or
● permanently taking the water harvesting
system offline.
-Bag filters clogged frequently.
- Media is approx. 1/3 of the intended size system
continues to have poor water quality and can't UV
treat.
- Turbidity sensor and flow meter are broken, pH
sensor needs recalibration, intake filters have
failed, and mechanical issues with irrigation pumps
not sending water to WAHASO (likely due to
clogging).
- Media in the vessels is reportedly nearing its life-
expectancy.
-37-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 17 Ruth R Caruthers Park Operations and Maintenance
# Task Name Description Inspection
Frequency
Cleaning/
replacement
Frequency
Notes
7 Irrigation Pump
and Discharge
Pump
Pumps are required to convey
captured stormwater for irrigation
or diversion to the stormwater
channel for emergency evacuation.
a. Irrigation use: 2 submersible
pumps capable of 200 GPM to the
irrigation system.
b. Emergency evacuation diversion
to the stormwater channel: 1 duty
pump capable of 3,150 GPM.
1x per month. As needed.
- Reclaimed water is directed back the storage
gallery if it fails to pass the BacT test.
d. Recommendations to Improve Caruthers Park Operations and Maintenance Within one year of beginning operations, the selected firm shall provide recommendations and estimated costs for operational and structural improvements, including improvements to the infiltration aspects that can be made to operate this regional project in a more cost-effective manner while maintaining the goal of improving the quality of urban and stormwater runoff in the main channels. The jurisdictional municipality reserves the right to select another firm to install any recommended improvements.
4. Sub Basin 4
a. Located on the Long Beach Airport property
b. The major runoff treatment component is a 14 ac-ft subsurface storage and infiltration system. Wet and dry weather flows are diverted from a nearby LACFCD channel. The regional project’s major components include:
● A grated inlet structure
● Flow Splitter Vault
● Two JDS pre-treatment systems
● 14 ac-ft storage and infiltration vault
-38-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 18 c. Anticipated Scope of Service
Note that this project originally had an infiltration component, but the infiltration rates appear to be negligible, and groundwater appears to be entering the storage/infiltration gallery through the bottom and sides of the gallery effectively negating any infiltration of runoff. Similar to the prior three projects, this gallery will be used primarily for settling and storage.
Sub Basin 4 (Long Beach Airport) Operations and Maintenance # Task Name Description Inspection
Frequency
Cleaning/
replacement
Frequency
Notes
1 Grated Drop Inlet
Diversion
Structure
The Los Cerritos Channel
Diversion Inlet Structure is a
rectangular reinforced concrete
box RCB) with a 16’ wide by 2.75’
high diversion opening. The
diversion opening will drop and
transition into a 60” diameter
reinforced concrete pipe (RCP),
which will convey discharge to the
Stormwater Flow Splitter
Structure. This structure has been
built into the sidewall of the
existing channel.
Before and after
rain events and
1x per month
minimum.
1x per month during
the wet season 1x
per qtr during dry
season.
- Channel may fill with trash and debris, may
need to be cleared 1x/month during rainy
season 1x per qtr during dry season.
-Currently there is no way to restrict dry
weather flows estimated at 100 gpm. Provide
a cost estimate to install a slide gate.
2 Stormwater Flow
Splitter
The Stormwater Flow Splitter
Structure is a rectangular
reinforced concrete vault that is
used to split flows before pre-
treatment. The structure does this
by utilizing a split weir, which
directs stormwater into the two
Jensen Diversion Structure (JDS)
Units for treatment. Once the
water is treated, the stormwater
enters the box again before exiting
through the motor activate sluice
gate into a 60” RCP.
Before and after
rain events and
1x per month
minimum.
As needed, quarterly
minimum.
- The slide gate separating the flow splitter
vault and the JDS units does not close.
properly, which leads to water coming in when
maintenance is performed.
- There is essentially no bypass mechanism.
-39-
@WM @WMQ
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 19 Sub Basin 4 (Long Beach Airport) Operations and Maintenance # Task Name Description Inspection
Frequency
Cleaning/
replacement
Frequency
Notes
3 Two (2) JDS Pre-
Treatment Unit
The two Stormwater Pre-treatment
JDS units use vortex
concentration and a non-blocking
screen to treat flows entering the
units. This treatment allows for the
capture of trash, debris, and other
particulates that affect water
quality.
After major
storm events or
1x per month
during wet
season
(whichever is
more frequent),
and once during
dry season.
2x per year,
contractor cleans.
- There is an accumulation of floatables and
sediment at the JDS units after storm events,
which is expected and indicates the units are
working.
-Per the O&M staff, the JDS units are cleaned
twice a year. The pumping of residual water
within is directed to either the inlet of the
infiltration gallery or the parallel JDS unit.
Sluice Gate
Stormwater exiting the flow splitter
structure will pass through a motor
activated sluice gate. This gate
will be used to control the flow rate
by changing the position of the
gate.
Every 3 months
and after runoff
events of 0.8
inches or less.
See attached
manual.
4 Flow Meter Current flow meter is inoperable. Inspect weekly.
Once a year or as
needed, whichever
is more frequent.
Flow meter is submerged. Firms will provide
installation cost of new meter model.
5a
Subsurface
Storage Structure
(Settling Basin)
The underground infiltration
gallery chambers provide storage
capacity to retain stormwater for
groundwater infiltration. Each
chamber is 14 feet in height.
There are also two access shafts
that are 10’ by 10,’ located at the
north-eastern and south-western
corner of the storage chamber
area. For Phase 1 of construction,
the approximate storage capacity
is 14 acre-feet (ac-ft.).
Annually (during
dry months) and
after every
runoff event
once the water
has infiltrated
and the gallery
is dry.
1x per year.
-There is persistent water in the structure
indicating infiltration is not occurring or is
otherwise well below initial expectations.
- Access to the galleries is difficult.
-40-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 20 Sub Basin 4 (Long Beach Airport) Operations and Maintenance # Task Name Description Inspection
Frequency
Cleaning/
replacement
Frequency
Notes
5b Water Level
Sensor
The water level sensor is located
inside the underground infiltration
gallery and measures the water
surface elevation within the
chambers. The programmable
logic controller is used to operate
the sluice gate when the infiltration
gallery reaches its storage
capacity.
Concurrently
with the
infiltration
gallery
inspection.
Annually (during
dry months) and
after every
runoff event
once the water
has infiltrated
and the gallery
is dry.
As needed. Level sensor inside the infiltration gallery has a discrepancy of approximately 2.5 feet.
5c
Programmable
Logic Controller
(PLC)
The PLC is used to control the
sluice gate by using the data
gathered by the flow meter and
the water level sensor. This
controller is used to power the
motor on the sluice gate to open
and close depending on the
conditions in the system.
Frequency
period: weekly
(preferred) or
monthly at a
minimum.
d. Recommendations to Improve Sub Basin 4 Operations and Maintenance Within one year of beginning operations, the selected firm shall provide recommendations and estimated costs for operational and structural improvements, including improvements to the infiltration aspects that can be made to operate this regional project in a more cost-effective manner while maintaining the goal of improving the quality of urban and stormwater runoff in the main channels. The jurisdictional municipality reserves the right to select another firm to install any recommended improvements. A preliminary report to this effect is included in Attachment 5. -41-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 21
5. Urban Orchard
a. Located at:
9475 West Frontage Road
South Gate CA 90280
b. This project differs from the above-named projects as it diverts wet and dry weather flows from the Badini Channel first to a constructed treatment wetland and a subsurface storage reservoir; a water quality pre-treatment hydrodynamic separator; and a stormwater harvesting system including additional filtration and a pump to provide irrigation for the orchard and buffer trees. This project is expected to be operational in December 2024. The selected firm will need to coordinate closely with the City of South Gate’s Water and Park and Recreation Departments so as not to overlap operations and maintenance efforts. The selected firm’s responsibilities will be the operation and maintenance of:
● The diversion structure in the Bandini Channel
● Pumps to the hydrodynamic separators
● Pumps to the constructed wetlands
● 2.52 ac-ft storage gallery
● Water Harvesting System
● Water overflows and discharge system
● All pumps, valves, sensors, and monitors related to the above c. Anticipated Scope of Service
Urban Orchard Operations and Maintenance
# Task Name Description Inspection Frequency Cleaning/ replacement Frequency Notes
1a
Bandini Grated
Drop Inlet and
Low Flow
Diversion
Structure
Drop Inlet
Structure
Before and after major
storm events or monthly
during wet season, once
during dry season.
- Debris removal and vacuum
cleaning 3x per wet season, once
per dry season after major storm
events as needed.
-Hydrojetting as needed.
-42-
@WM @WMQ
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 22 Urban Orchard Operations and Maintenance
# Task Name Description Inspection Frequency Cleaning/ replacement Frequency Notes
1b
Actuated
Valve
Structure
After major storm events
or monthly during wet
season, once per dry
season.
- Debris removal and vacuum
cleaning as needed.
- Hydrojetting annually or as
needed.
- Valve maintenance as needed.
- Actuator battery replacement
every 5 years.
2a Diversion
Pump Station Wet well
After major storm,
monthly during wet
season, once during dry
season.
Vacuuming annually or as needed.
2b Diversion
Pump Station
Valve
Operation
and
Pump
Operation
- Cycle monthly (minimum) during
the dry season.
- Clean and service annually in
advance of the wet season.
3 Hydrodynamic
Separator
- -
4a Pump Station 6-pump
configuration Wet well inspection.
5a
Pre-Cast
Concrete
Reservoir
- -
After major storm events
(inspect from surface
minimum 72 hrs after
storm event) or monthly
during wet season, once
per dry season.
-43-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 23 Urban Orchard Operations and Maintenance
# Task Name Description Inspection Frequency Cleaning/ replacement Frequency Notes
5b Sediment
Basin
Vacuum cleaning every 2 years or
as needed, whichever is more
frequent.
5c
Storage/
Infiltration
Chamber
Every 10 years or as needed,
whichever is more frequent.
6 Active
Controls
- Monthly or as needed
based on receipt of an
alert.
- Review annually.
As needed.
NOTE: Contractor is required to:
● Review system status and
performance using cloud-based
dashboard
● Calibrate RTC logic
● Renew OptiRTC subscription
7 Post BMP
Pump Station
Irrigation
Pumps
After major storm,
monthly during wet
season, once during dry
season.
- Cycle monthly (minimum) during
dry season.
- Clean and service annually in
advance of the wet season.
d. Recommendations to Improve Urban Orchard Operations and Maintenance Within one year of beginning operations, the selected firm shall provide recommendations and estimated costs for operational and structural improvements, including improvements to the infiltration aspects that can be made to operate this regional project in a more cost-effective manner while maintaining the goal of improving the quality of urban and stormwater runoff in the main channels. The jurisdictional municipality reserves the right to select another firm to install any recommended improvements.
-44-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 24
Attachment 2 - Illustrative Schematic for Each of the Project Site
-45-
@WM @WM
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 25 Mayfair Park
-46-
‘4,
Removeand Replace w
Baseball Field ‘ ' Subsurface Storage Unit
13.81 AF (4.5 MG)
3;.
LACFCD Covered RC Channel
(23 Wx11’- 6” H)
_ A. .
Treatment Unit Building _ v
and RD Controls ’
Sanitary Sewer 7 ,-
Discharge Line
Storm Drain Dischrge
Treatment Unit ‘ Rubber Dam Diversion
Structure (23 W x 3‘ H)
Treatment Unit Buiing _ i
and RD Controls '
Sanitary Sewer
Discharge Line
Storm Drain Dischrge V
Treatment Unit 'f '
\ ’3
" ‘ Subsurfac torge Ui
13.81 AF (4.5 MG)
‘ Rubber Dam Diversion
Structure (23’ W x 3’ H)
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 26 Caruthers Park
-47-
Undergrourfi 810% Facility 15'-H: 7.5 AF.’2.4‘*MG)
LA
.....
[E TETRA TECH
is
-'/
Channeffirslon
Stormwatér H . '
TreatM
PreTrearrmmt
ConnectionidSanitary
Sewer
Pump Stati
Reservoir Storage Ama
[fl TETRA TECH
i;
. ‘, I
1 , ' ' 1-"
‘— r I 4 , _.V Channerfirsion
.-v
\
1-
!— filflflw __
'_ | _ ow- — ‘ ' . ,
.- ammunp." ‘
J ‘. F Undergroun‘a Stoke Facility [5s 7.5 AF. 2.4m.) ‘ d J O,
Stormwater H ng
Treatmen _
————
PreTreatrflfl'nn
Connecflonm‘sanitaw
Sewer
Pump Statiofil
«
‘ \\ Reservow Storage Area
H'fiz‘n Drain Dlvcrsmn
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 27 Bolivar Park
-48-
OVERFLOW T ,, , STORAGE
SYSTEM I ’13:.” :3 /lNFlLTRATION FACILITY ‘
‘r-x'."
3. Pump? Station ‘
Discharge to
Sta . .iDrain
.‘FV
Lakewood SW Capture Project at Bel
GENERAL PLAN
STORAGE ___.4 CONVEYANCE . DIVERSION
; ,4:- ‘4‘. 4 /lNFlLTRATIONFACILlTY -_ 4 _ ‘ ‘ SYSTEM ‘- - .4. SYSTEM Discharge to
St' ..“ ain
Le
m
é
i
g
i
d
e
Av
e
Lakewood SW Capture Project at};
GEN ERAL PLAN
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 28 Sub Basin 4
See full map here: LCC Sub Basin 4 Map
-49-
“Irwfimm-WH- I
IWMW‘IIIJIT
_nammnmwne '
mflmnnnunmmmmmm ' _ Wfiéfimflmfln‘fl .
“k-
Mm.
.
-
C 251
T
I Ix}, I
33 3
8 .3
3 5
5 .
HQ
I
Q
Q
I
Q
d
fi-I
Q
~
1 fiiI
I
I
-
I
-
I
w IL
I
w I;
I _:
_
_
_
:
_
I4
-
44..
...
I
..
.
?
hy
m
m
m
m
.
2. 7
%
mm
\
_
._
m . :ym
u
m
mu
m.
a?
am
,
mm
“w
a
g
;
.
i
m
Mu
g
m
m
m
fi
mm
LI
M
E
mm
.
“m
w
m
w
m.
_
I
_
a.
M
as
;
..
w
__
mm
m:
“M
i
a
.
.
mm
m_
..
.
.
.
.
i
.
_.fi_
.
x
a
..
.
I
,
.
.
.
_
I
.
I
.
.
I
.
.
.
I
_
_
,
_ ,
WW
W
.
-. . . u I.
m
I
fi/M
V
I
.
«m
m
VI
I
/
m
m
k
.- . . .
‘
\
..
.
-
I
..
.
.
z
/ \.
_ a.
w
L
SW
I
M
/
u
\
ma
x
/
/
Ni
”
;
V
/I
‘I
I
I u
I—
\
/~
/
P
1/
./
,
/
STORMWATER CAPTURE Fawn-
CIVIL SITE PLAN
L03 CE'RRI'I'OS CHANNEL SUBF‘BASIN 4
I wanna "any!!!“
vim—III!
III!
REVISIONS m.
A
”m
m
m mm
x
mm
m H
mm
“
m
mm
m
IEEUIEIG-‘a..__.___-___ unnum-
=__,_
.- /"/ 5/ /-, . ,
“15"": . “mu-
./
r ,r -
IEHZIIEIIII - -
ammmmmmmmm
éififiasf' EHANIQEL
/. . r 3-" / A“ A
f ,
Lo
EEIEIII
' ZIP—“Ell”— [SE '
'STORMWATER CAPTURE FACILITY
CIVIL SITE PLAN
L06 CE'RRITOS CHANNEL SUB-BASIN 4
5.. .u— nun-u
4‘
A
.5
}
An
.
.
.
3. .
lfil.
,
[A
J
A
I
I
J
J
I
I
I
I
I
J
I
II
I
.
,,
r
.
.
4 .
.
:
|
.
.
l
,
«
I
a
I
~
.m
u
m
JI
I
I
I
I
I
I
I
I
I
I
I
F
.
I
ll
..
..
.
Il
l
t
l
‘
\
\
‘
\
I
I.
I.
‘2
"
.
.
I
\I
.
X
.
numb-19“..“
91mm huh-smut
Uni-i.
si
g
h
.
I
I7
_
_
I
I
I
AA
A
A
IV
.
“
A :1
7 REVISIONS %
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 29 Urban Orchard
See full map here: Urban Orchard Map
-50-
-.\ mHU'E'SPEnIfimm mmmm mummmmrmvmmmmm-ofium
o+
.
¢
«
¢
¢
.
€
¢
€
fi
RESERVOIR STAUSIIGS: _
..
..
__
9. 9
9 of
.
.
.
.
..
.
. ¢o
.
o
¢
?
¢
o
o
+
¢
.
¢
.
o
o
h
..
..
.
¢uo
u$3.90»ooonouou
o
u
o
u
o
u
n
u
o
n
o
o
o
u
o
u
d
.
._
ap
o
o
o
o
o
¢
o
¢
o
¢
o
¢
o
o
o
o
o
o
o
¢
.L
.
.
.
.
‘4
.
.
O
O
Q.
.
.
.
.
.
O
.
¢
p
,
3 E 3.
“
.
:
.
.
.5
.
.
.
O
. d ..
.
”y
u
m
”
.
do
.
»
0 oo
u
o
u
o
o
o
o
o
o
é
;
a,
55 3
.
.
«z
_.
wo
o
d
”
?
o
o
a
a
o
o
o
fioo
fion
o
u
f
.
0 0
0 2
%
.
.
.
.
. . .
oc
¢
o
a
¢
¢
¢
¢
#
?
¢
¢
o
o
o
¢
o
u
o
¢
94 ¢
0&
0 fiwm
a
é
‘
o
w
.
to
.
.4
4 4.4
. . .u
.m
n
u
w
w
e
u
m
u
a
o
v
.
a.
.
.
we
.
.
.
3”
fiée
.
o
O
00 o o
to
.
to
.
”+
0 6
9 0
p
oo
0 o
+
o
¢
o
¢
u
m
u
o
u
fin4
4 ,
.r
.
a
.
..
.3
.
.
.
O“
.“
N
.
Ii
i
a
fiiO
i
fiON
O
M
O
N
O
H
O
"
Gr
.
0 . C.
‘
4‘
“
.
..
..
..
.4
13 ooououo
u
o
o
q
o
d
u
m
J.
. .
.
O.
.9
0 0.
0 _.
mo
a
w
v
w
f
o
u
o
w
m
w
u
n
n
o
n
u
3 ea
.
.
.
"
2:
?
»
#4
4 “
?
.
3. 6
.
0 0
”fing
w
t
o
v
>2 mmmnmmmmmmmmmnmm.mws=
Immuflmfimmemmsrwémarm _
mammmcfim _ - ;
6:. WMVAmmna-mmumsm. murmurmmmmaenlm 53mm:
MEWS.
3L mmmmmxmmmmmmmwwm
Q; wa‘mfimmBmmfiEmmmmaeubnfirtmdfinE-W
J
.'
If
f
I
I
;. NOTES-i;
1‘...
4L
1:.
..
..
00 0
"
.
“
00 0
0 9
4 1
0. .
O
h
en
o
u
o
u
o
o
9. 0
.
o
94 ¢
.
.
o
99 %
.
.
a
flow
n
?
»
o
o
o
2. 00
0 o
9’
0 ”
”
.
.
.
o
4 c .
a
m
.
w
w
f
i
f
i
é
y
3 %
“
m
a
fi
a
”
.
a
3 II
!
9. (fl
fi¢O
§
(n
.
OO
O
O
O
O
O
O
O
O
O
O
O
’
O
‘
.
..
90 0
0 0
0 0
0 0
9 .
.
.
.
A.
CO
O
.
.
.
O
O
O
O
O
O
O
O
O
¢
O
§
0 ¢
O
¢
O
O
O
O
0. 0
.
0 .
4 .
‘
.4
.
.
.
.4
..
,.
_
,
.
.
.
¢
§
M
4 .0
; ms:
mmmxmmmfimmormmm.
~2 Warm 7
IL
0 Rmmmmmmmmmmmmsr
3, ummmmafimmmmmmmmmm
A.
mmmma
ILIEW UlflTOE WWEWE SWWBYW
5. mmmmmmmnfimmmmmmwmflmfimm
-«
ALLHFEWMLIEDTOEWBIEE.
mammmcflm ..
6c. mumvmmmns-mmum’sm. LMTSGEXMMWNDWMEAM amnion
1,
31111311. _ .' ‘
' m '1 .
Q. FAWMWBWWKMWHWEWATHMGHEW
mum)
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 30 Attachment 3 - Photos of Existing O&M Efforts (Plastic Bags in Pumps, Sludge in Storage Vaults, etc.)
Workman removing solids from vault.
-51-
@WM
‘
eg
g
.
.
.
:
2 3
A
.
5 .
.
.
_
:
.:
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 31
Plastic bags entwined in pump impeller.
-52-
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 32 Attachment 4 - Links to O&M Manuals
Mayfair O&M Manual: Mayfair O&M Manual
Bolivar O&M Manual: Bolivar O&M Manual
Caruthers O&M Manual: Caruthers O&M Manual
Sub Basin 4 O&M Manual: Long Beach Airport O&M Manual
Urban Orchard O&M Manual: Urban Orchard O&M Manual
-53-
@WM @WM
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 33 Attachment 5 - BMP Engineering Recommendations
Bolivar Park: Engineering Report
Ruth R. Caruthers Park: Not available at this time
Mayfair Park: Not available at this time
Sub Basin 4: Engineering Report
Urban Orchard: This section is not applicable to Urban Orchard
-54-
@WM @WM
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 34 Attachment 6- SCADA Images
Bolivar SCADA
Bolivar SCADA
-55-
Alarms Rubber Dam
AC Power Fail
Bladder Pressure High
fladder Pres Sensor Fault
E-Stop Pressed
UPS Fault
rss Conflg
cycle 0 secs
Duration 0 secs
Mln Level 0 . 0 feet
Dam Ll DOWN fll
Override Level 3 _ 9) feet
Override Res... 1 _ 0 feet
Hold Up Time 43 _ 0 hrs
OK TO RAISE
«more
LOWER
Storm Water
Channel
Level
0.3 feet
Alarms Pump Station
Communication Fail *l
Inlet Valve Fail
1 Fall
2 Fail
5 Fall
Fall
VFD Setpolnts {P1,PZ, &P3)
Rotation Sequence
1-Z-3
Z-1-3
3 HAND
AUTO
Lead Start Level
Level Setpoint feet
Pl Speed P2 Speed F3 Speed
hZ hZ hZ
PLIITI Station
Level
leet
Opt! Mode
'IEP FORW
WET
Opt! Control PASSTHRU DRY
PREP FOR WET
WET
Pump 4 gal
Start Level
IEE
Infiltration Gallery
Flow
SPY"
m
Irlches
Storage
NONI
slmllarte 3 monitoring wells.JD
7.7 fr, old p4 Stop level
3.3 ft, 79W pA stop level
01/03/2022 MOV 50: The vault mov50 Should have a
ater tlght seal at bottom, Vault does not have a seal or seal leaks durlng ralrl event water level rlses and lowers Opt] MOV-Gll
CLOSE
OPEN
PASSTHRU
OPEN
CLOSE
READV
Infiltrati..
Level Level
Inthes leel
5%
In rr
in rr
Al rr
r‘lmlln
Pressure Control
A lNL
Wetwell
pSl
Setoint 60-51 ‘
VULL
Pressure
Alarms Wanaso
Ejector Pump Fault
Ejector Pump gn Temp
UV Alarm
Hydrocarbon High i W
RESET
Hydrocarbn Turbldlty
ntu ma
l W pH
In um pH
SYSTEMOFF
MANUAL
Pressfi
-1
psl
‘ Flow
9pm
Total 13434951 als
Irrigation
Alarm! Rubber Dam
AC Power Fall
I Bladder Pressure nh
l Bladder Pres Sensor Fault
l E-Stop Pressed
UPS Fault
rss Conflg
Cyde
Duration
Mln Level
Dom
UP DOWN AUTO
Override Level 3.9 feet
Overrlde Res... 1.0 feet
Hold Up Time 48 _ 0 hrs
Storm Water
Channel
Alarm Pump Station
Communication Fail
Inlet Valve Fall
VFD Setpolnts {P1, P2, ”3)
Rotation Sequence
HAND 1-2-3
AUTO -
Lead Start Level
Level Setpolnt
Opt] Mode Mom ”UNIS Walrus-o
S
5 OprIComroI
PASSTHRU ' 'ldpzlstlaplevel DRY _— . a cd i l. «l PREP FORWET n M 5 Op W WET Punrpl
LJIFAI
Start Level
Infiltration Gallery
Opli MO v50
Pum Statlon
PASSTHRU
OPEN
Storage I nfiltrati.,
Level
Inches Inches
DUES/2022 MOV 50: The vault movSU should have a
ater tight seal at bottom, Vault does not have a seal or k: dllrlng raln event water level rises and lowers
lll‘l cm: 3 monltorlng welll
Ejector Pump Fault
Ejector Pump High TemL
HOV-l
UV Alarm
Hydrocarbon High
Pressure Control
A lllr
Setpoint 60 951‘
v nu
Total 13434951 als
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 35 Mayfair SCADA
Mayfair SCADA
-56-
Alums Rubber Dam
Emergency Stop
UPS Fault
UPS on Battery
Los Cerritos
Channel
Bladder
psi
Low FRED
Air Pres
psi
Alarms Intake
AC Power Fail
iBladder Pressure nh UPS On Battery
Bladder Pressure Fault UPS Fail
Intrusion
Invalid Operating Mode MOV-403 Fa
Settling Level High
Supply Pressure Fault Storage Level nh
Hydrocarbon Level High
Moll-491
OPEN CLOSE AUTO
Close Level
Open Level
:mimnwn neserl
LIT-402 LIT-4m
Moll-402
leet reet
_ SettllngArea I StorageArea
Catch Basin
Alarm Wuhuso
Booster 1 Fault
Booster gFault
Hector Pump Fault
Turbidity High
Wetwell Level nh Ejector Pump High Temp — '5 Ejector Pump Seal Leak AlT-loz
0.1 % IeI
Pressure
psi
MEN-403
MOV-403
CHANNEL
SEWER
Pressure
a
Kraken Membrane
Filter Cartridge
ater Treatment Unlt
Finn 1
Alum- Ruhher Dam
l Bladder Pressure High
I Bladder Pressure Fault
L Emergency Stop
Invalid Operating Mode
Supply Pressure Fault
UPS Fault
UPS on Battery
MOV-lflf
‘ Alum: Intake
AC Power Fail
ups On Battery
UPS Fail
1ntruj>n
MOV—403 Fall
Settling Level High
Storage Level
Hydrocarbon Level nh
OPEN CLOSE AUTO
Close Level
Open Level
Shutdumr Reset
teat
Los Cerritos
Channel
' Bladder
psl
LOWERED
lurPres
psl
AITJDZ
Pressure
% lei
47 psr
LIT-402 LIT-4m
reet feet
- Settling Area Storage Area
Catch Basin
Alums Wuhan
Baaatan Fault —
Booster 2 Fault Turbidity High
Ejector Pump Fault Wetwell Level nh Ejector Pump HIshTamp — Ejector Pump Seal Leak Kraken Membrane
filter cartrldge
ater Treatment Unit
Pressure FlTrdOl
1 pal gram
MOV-403 -
Hm» "J E.
SEWER
RFQ for Operations, Maintenance, and Evaluation of Five (5) Regional Stormwater Capture and Treatment Projects 36
Caruthers SCADA
Caruthers SCADA
SCADA illustrations are not available for Sub Basin 4 and Urban Orchard.
-57-
@WMll
luau lam
Alarms Intake
communication F8"
Alums Rubber Dam
—
7 Bladder Pressure High
Bladder Pressure Fault
Emergency Stop ‘ A that!
Invalid Operating Mode m
—m
‘ Supply Pressure Fault
5 Fault
i on Battery
i lot Pressure Low
am Control Mode Pressure
pSl
V Alarm tuso Booster Pump1 Foil — Booster Pump 2 Foil
Ejector Pump Fail Wetwell Level i
' CID! Pum- h Tern '
Pasltlol’l
Laval Level Level
Infiltration Infiltration Settling
Gallery 1 Gallery 2
Storm Drain Channel
LOWERED
Ilfl
MOV—1 03
HCarb In HCarb Out
Alums Intake
Communlcatlon Fall
Alums Rubber Darn
—
[ Bladder Pressure High
Ijladder Pressure Fault
|:Emergency Stop }
Reid
finvalld Operating Mode
‘ Supply Pressure Fault
S Fault
i on Battery mm W l
Control Mode
mm
Alarm Wuhan
Booster Pump 1 Fall
Booster Pump 2 Fall
Ejector Pump Fall
ector 7
W
‘ p51
Pusmun
Level
lee!
- ettllng Storage
Laval ‘ Level
veer reet
1P1 1P2 P201 Infiltration
Gallery 1
lnfiltratlon Setting
Gallery 2
LOWERED
NIC
Posman
Wetwell
’I Moll-1 03
Ilil
%
>4
— "fin-I L
F Wetwel Level
Request for Qualifications for Operations,
Maintenance, and Evaluation of Regional Stormwater
Capture and Treatment Projects
August 21, 2024
Responses to Questions Received
A total of two questions were appropriately submitted by the deadline for receiving questions regarding the Request for Qualifications (RFQ) for Operations, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects issued on July 30, 2024. The following are the questions and responses to the questions.
1. Q: Since the balance of workload for O&M, SCADA, Engineering and Technical Services, and Construction/Repair is not established by the RFQ, can the lead, in a multi-firm submittal, be from any of these disciplines? A: Yes.
2. Q: For Step 1 of the RFQ process will the Lead Firm need to include SOQ information for maintenance providers that they may subcontract for sediment/trash removal from structures (e.g. pre-treatment units, diversion structures)? A: Yes, provide information as described in Section 3.1 of the RFQ.
-58-
£6301 Paramount Beulevard WWV‘LEJlE‘.‘."-3‘,'Wat€! mg
Paramount. CA 90723
562.663.6850 phone
5626348216 fax
Jaint Fatwa Atrth writ)?
Adrian: Flam: (Para'mourlt). flour-rt Choir- Kalli Pick!“ MW“), Vino-Chain Thomas Bellman! Hill}, WNW Fundy sawing Bat-way cities and agendas in 3mm Lns- Angel-s Cuunt'y titan-IMAM Sail- Builfi'ar'dmr -Batlfinwi_ar Centraifiasin MmicipaEW'atarDistrict Ghrritqs- Cornmm- cama £31m? mam WWI-am L-atlal- Laktawood- Long Beaci't- Lona BeachWflerDepamm Lyman: Mlaywood- Mom-balm}: nm- w With TIWSWFMWSMWWWMMWW
lEzélOl Paramount Boulevard wwwgm,:_\...,,3\’,wat,3_, mg Paramount. CA 90723
562.663.6850 phone
562d63¢8216 fax
L05 Angela: G'atewdy Raglan
Integrqted Regioa Water Management ‘_
Joint Powell: Authority
Adriana Figueroa (lonnl). Bard emu-.- Kdll Pickle?! (Lakiwood), Via-Chair- Thms Samurai Hill), WNW Pmdly saving “may dues and agenda- in 3mm Lu Ann-m County MnmbwArtasni- Ball- Headma- Ballflawsr Cam-13am MmicipaiWataesh-Ict Carritas- mm- Con-rpm- cum}!- 0q mam Muster: Put- Lam Lakmod- Long Buch- Long Bunch wuorDoparunwt- Lynwood Maywcod- .Mmubollo- Home!!! -W- With Tachnical Support From The Summon mono; Ange!“ Gama:
Pasadena | San Diego | California
STATEMENT OF QUALIFICATIONS FOR
OPERATIONS, MAINTENANCE, AND EVALUATION OF
REGIONAL STORMWATER CAPTURE AND TREATMENT
PROJECTS
September 16, 2024
Gateway Water Management Authority
16401 Paramount Boulevard
Paramount, California 90723 -59-
if water"
engineering. inc.
craft cra fiwater“
engineering, inc.
Cover LetterSECTION 0
-60-
craftlEflwater’” craftlEflwater"
San Diego | Los Angeles
September 16, 2024 805.729.0943
craftwaterinc.com
Ms. Madeline Anderson
Gateway Water Management Authority
16401 Paramount Boulevard
Paramount, CA 90723
Subject: Statement of Qualifications for Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects
Dear Ms. Anderson:
We are pleased to submit Craftwater Engineering’s (Craftwater) Statement of Qualifications (SOQ) to provide Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects for the Gateway Water Management Authority (GWMA). The engineers at Craftwater are fortunate to have a long history of supporting the GWMA agencies featuring the development of Watershed Management Programs (WMPs), stormwater capture feasibility studies, and the design of some of the most advanced stormwater projects in Southern California.
Craftwater is the leading industry expert with the Safe, Clean Water Program (SCWP). In fact, Craftwater’s personnel led or previously supported the feasibility studies and designs of 63 of the 151 SCWP Infrastructure Program projects submitted since program inception. To date, our SCWP funding applications have had over an 85% success rate, securing over $470 Million from the Safe, Clean Water Infrastructure Program, which includes $320 Million for construction funding. Our team has also successfully supported 5 SCWP Project Modifications that included site modifications and resulted in $37 Million in additional funding. Our SCWP experience has taught us that having secured the design and construction funding for this crucial project will require a design team that has the ability to evaluate site alternatives and optimize the size and performance of this infrastructure in order to implement the best project for the City while meeting key performance metrics.
Our team's demonstrated success through this approach will greatly enhance the City’s ability to also be in the best position for construction funding.
We have assembled the most experienced team of industry-leading experts in stormwater capture design and analysis in California. Our key project team members include Chad Helmle, PE, Principal in Charge, Oliver Galang, PE, Program Manager, and Merrill Taylor, PE, Lead Project Manager. Our carefully selected partners include firms with expertise in regional stormwater capture facility components including Black & Veatch (Operations, Maintenance, SCADA, and construction services), Downstream Services (BMP Cleaning Services), Epic CleanTec (Stormwater Harvesting Systems), FMF Pandion (Monitoring Services), Opti (Active BMP Controls and Optimization), Pre-Con (Pre-Cast storage units and construction services), and Projectline (SCADA controls and operations). Our team has been assembled to provide the GWMA agencies with a full depth of resources for this project.
Should you have any questions, you may contact me at 213-598-4178 or [email protected]. As our company’s Principal, I am the authorized representative for all communication and negotiations concerning this RFQ, I acknowledge by signing this cover letter that all statements are true and correct, and that we received and considered all addenda to the RFQ.
Respectfully submitted,
Oliver Galang, PE | Principal | Craftwater Engineering
-61-
craftflwater‘
engineering, inc.
craftfiwater‘
engineering, inc.
SECTION 1 Qualifications and Experience
-62-
C .
er
tr.
craftlc’ wat
engineering, '
V
Qualifications ano :
w er
‘fi
craftlx wat
engineering, '
V
}
pflmfi
.
..
.
p
‘
.v
‘
x
l
i
v
bi
l
l
!
_
..
r
l
‘
dl
i
t
.
I
QUGIINCBUOUS anu :
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects
Section 1 – Company Qualifications Page 1-1
1| COMPANY QUALIFICATIONS AND EXPERIENCE
This section provides an overview of the Craftwater
Team (Firm and Subconsultants) and the Experience of
our team. We have assembled a team to provide a full
depth of resources from operation, maintenance,
monitoring, SCADA, and construction services.
1.1 FIRM DESCRIPTION AND STABILITY
Craftwater Engineering,
Inc., established in April
2019 and headquartered in
Southern California, is a California corporation certified Disabled Veteran Owned Business Enterprise (DVBE) and
Micro Business (MB) structured to deliver agile, full-
spectrum service to the stormwater market in California.
In over 5 years, our rapidly growing team of 26
associates, located in Pasadena and San Diego are
skilled at adapting to the continuously evolving
regulatory environment, yet grounded enough to
deliver high quality and readily- constructible designs.
We take pride in programmatic stewardship – avoiding
the pitfalls of changing teams between the planning,
concept, full design, construction, and monitoring
phases of each project. Craftwater is poised to continue to serve the Gateway Watershed Management Authority
(GWMA) by helping to deliver innovative multi-benefit
project designs/bid documents and feasibility studies,
shape practical regional stormwater policy, and
strategically plan investments in green infrastructure and high-end monitoring. We strive to provide meaningful
environmental outcomes with affordable and functional
water infrastructure to California and beyond.
With over 120 years of combined experience in the field of civil engineering, we take pride in the fact that every project manager on our founding team is a licensed
Professional Engineer in the state of California. Our
engineers have identified, envisioned, evaluated
feasibility, designed, and/or contributed to construction oversight for approximately 24 regional stormwater
capture projects within the Los Angeles County area
including but not limited to stormwater capture projects in Lakewood (Bolivar Park and Mayfair Park), Bellflower (Caruthers Park and Simms Park), Duarte (Encanto Park), Downey (Furman Park, Apollo Park, Independence Park),
Lynwood (Lynwood City Park), Long Beach (Heartwell
Parks, Skylinks, and El Dorado Park), Pomona (Fairplex), Paramount (Spane Park and Progress Park), Signal Hill
(Reservoir Park), and Whittier (York Field). We aim to
continue this proven success with the GWMA.
As trusted strategic advisers and designers, our mission is to always act genuinely to advance the best interests of our clients, the environment, and the state of science by designing real solutions for total water cycle
management. Our core services include Watershed
Science, Modeling, and Planning; Stormwater Capture
Feasibility and Design; Operations and Maintenance, and Regulatory and Water Quality Science. Recently
described as “the most well-connected firm in LA,” our
agile team is prepared to leverage our national
relationships and resources to provide the GWMA and its member agencies with unparalleled quality, efficiency,
and a client-centric culture.
1.2 SUBCONSULTANTS
Craftwater Engineering has selected the following highly qualified teaming partner who complements our team to
support the GWMA with a full spectrum of services.
Black & Veatch (B&V). Black &
Veatch Corporation is a leading
global engineering, consulting and
construction company specializing
in infrastructure development in energy, water,
telecommunications, management consulting, and
federal and environmental markets. Founded in 1915,
Black & Veatch is an employee owned $3.3 billion
company. Through 100+ years of our history, our
As trusted strategic advisors, our mission is to always act genuinely to advance the best interests of our clients, the environment, and the state of the science by designing
real solutions for total water cycle management.
-63-
engineering. inc.
BLACK 8: VEATCH
craftidiwater"
engineering. inc.
cngineering, inc.
BLACK 8: VEATCH
craftjtiwater"
engineerlng. inc.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects
Section 1 – Company Qualifications Page 1-2
professionals have provided the best technology-based
solutions for collection, treatment, reuse, and disposal of wastewater. Our success is secured through meeting our
client’s expectations, meeting schedules, and providing optimized cost-effective solutions. Of particular value to GWMA is Black & Veatch’s local experience in
construction, operations and maintenance services of
stormwater facilities. Since establishing a California
presence 35 years ago, Black & Veatch has fielded strong local teams while leveraging our global expertise as
needed. With offices throughout Southern California,
including Los Angeles, Irvine, San Marcos, and Murietta (Riverside County). Our local capabilities will allow us to be where you want us, when you want us.
Downstream Services.
Downstream Services,
Inc. [DSI] is a certified
small business enterprise, recognized for its dynamic
approach and professionalism within the environmental
industry. We specialize in the assessment, maintenance, and rehabilitation of stormwater, wastewater, and
underground utility systems. Currently, Downstream
Services retains 77 employees between our two
locations, which include our Corporate Office located in Escondido, CA and our satellite office located in Ventura, CA. DSI has continuously provided critical solutions in environmental compliance for over 21 years through
working with private owners, county/city agencies and
state or federal facilities. Our team of technicians and operators are skilled cleaning and maintenance
professionals who excel in expeditious situations while ensuring environmental compliance is being followed
and proper reporting is being conducted. Downstream
Services also staff underground repair specialists who can tackle a number of steel, concrete, or cured in place
structure repairs.
Epic CleanTec. Born out
of work with the Bill and
Melinda Gates
Foundation's Reinvent the Toilet Challenge, Epic
Cleantec has become a leader in the onsite water reuse
space, trusted by leading players in real estate nationally.
We bring multidisciplinary expertise spanning water and wastewater infrastructure, engineering, building science, and water policy to create systems that maximize water
conservation potential for new development.
Commonly referred to as ”onsite water reuse,” the
concept of integrating water recycling systems into new buildings was largely driven by regulations that were
adopted in San Francisco in 2015. Headquartered in San
Francisco, CA, Epic Cleantec was founded to meet the
needs of the nascent onsite and stormwater
harvesting/reuse market, and ongoing building
operations. Where many vendors are involved at the
system level only, Epic recognizes that most projects
require a turnkey provider who will also address building integration, permitting and regulatory stakeholder
management, and ongoing operations and maintenance.
FMF Pandion. FMF Pandion is a
Federally certified 8(a), Small
Disadvantaged Business (SDB),
Service Disabled Veteran Owned
Small Business (SDVOSB) and and
an Indian Small Business Economic Enterprise (ISBEE).
We are also a State of California certified Small Business Enterprise – Micro (SBE), Disabled Veteran Business
Enterprise (DVBE), and Disadvantaged Business
Enterprise (DBE) (Native American). FMF Pandion is a full service environmental and engineering consultancy that
will provide water quality monitoring technology and
services to the GWMA. Our business model allows us the
flexibility to bring the right people on board to support your project in a technically solid and cost effective
manner.
Opti. Opti, an Aliaxis
company, is the leading
provider of digital adaptive
stormwater control solutions. With over 300
deployments to date, Opti empowers customers and
partners to address the impacts of climate change, aging infrastructure, urbanization, and water pollution,
enabling them to secure the sustainability of our
communities and natural resources. Our cloud-based
platform optimizes stormwater asset performance with
immediate results while providing ongoing, long-term
functional insights to inform future investment priorities.
Opti revolutionizes stormwater management with a
cloud-based solution that makes infrastructure smart
through continuous monitoring and adaptive control
(CMAC). By seamlessly combining real-time sensor data
and weather forecasts, our platform actively manages
-64-
'fl”
flaming-mm ”/I\\‘
r Op’ri
by allaxls
O 0 g & eplccleantec
craift'flwater"
n neerlng. inc.
f
@vnflream ”II\\‘
0’. Opfi
by allaxls
O 0 . & eplccleantec
craftflwater‘
engineerlng. inc.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects
Section 1 – Company Qualifications Page 1-3
stormwater flows and storage, ensuring efficiency and
resilience across the watershed. With Opti, every drop is managed smarter, making our communities safer and
our environments healthier.
Pre-Con. Pre-Con Products is a
general engineering contractor
with a unique ability to combine construction and
manufacturing within a single operation. We have a
proven record of bringing innovative solutions to remote and complex project sites. Our unique manufacturing
capabilities allow us to pre-fabricate, where appropriate, those items which would be difficult, cost prohibitive, time critical or more risky to construct on-site. Our areas of expertise are in precast concrete, concrete
construction, stormwater management, foundations and
renewable energy products. Pre-Con will support the
GWMA with potential retrofit needs to facilitate
operations and maintenance of the regional stormwater
capture facilities.
ProjectLine Technical
Services. ProjectLine is a
California corporation
specializing in professional and technical engineering
services for infrastructure projects. ProjectLine is a Caltrans-certified Disadvantaged Minority and Women-
Owned Business Enterprise and MWD and State-certified
Small Business Enterprise (DBE/WBE/SBE). Our clients
include national engineering companies and major
infrastructure management agencies. We offer expertise
to transportation, water, wastewater, energy, industrial engineering, and information technology markets.
ProjectLine clients include Caltrans, Los Angeles
Department of Water and Power (LADWP), Metropolitan
Water District of Southern California (MWD), Orange
County Sanitation District (OCSD), and Cities such as Los Angeles and Riverside, for whom we provide engineering
services. ProjectLine offer services from project planning and feasibility studies, to design and construction-phase engineering services, such as Design-build and SCADA,
telecommunications, network and security upgrade
designs and system integration.
1.3 EXPERIENCE TABLE
The following table provides a summary of the
Craftwater Team’s experience with the design of
regional scale stormwater capture projects. The
Table provides a project list showing completed
projects and the status of current projects and
percent complete.
The Craftwater Team has identified,
conceptualized, and designed over 100 regional
stormwater capture projects totaling greater
than $1 Billion of construction costs:
More than any other team in the region.
-65-
ProjectLine
Technical Services, Inc.
+
craftflwater‘
engineerlng. inc.
ProjectLine
Technical Services, Inc.
+
craftflwater‘
engineerlng. inc.
GATEWAY WATER MANAGEMENT AUTHORITY Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects Section 1 – Company Qualifications and Experience Page 1-4
Project Name Project
Developer
Treatment
Volume
(AF)
Construction Cost Project
Status
Fe
a
s
i
b
i
l
i
t
y
S
t
u
d
y
Pr
e
l
i
m
i
n
a
r
y
En
g
i
n
e
e
r
i
n
g
Fi
n
a
l
D
e
s
i
g
n
Ge
o
t
e
c
h
n
i
c
a
l
In
v
e
s
t
i
g
a
t
i
o
n
Pe
r
m
i
t
s
Co
n
s
t
r
u
c
t
i
o
n
SC
W
R
e
p
o
r
t
i
n
g
Pu
b
l
i
c
O
u
t
r
e
a
c
h
Adventure Park Multi Benefit
Stormwater Capture Project
Los Angeles
County Public
Works
24 $ 13,500,000 In
Construction
Arroyo Seco-San Rafael
Treatment Wetlands
Pasadena 30 $ 12,900,000 90% Design Sierra Madre Median Retrofit Pasadena 0.25 $ 5,500,000 60% Design Simms Park Stormwater
Capture Project
Bellflower 24 $ 15,700,000 60% Design Bolivar Park Stormwater
Capture Project
Lakewood 8.9 $ 11,000,000 Constructed Carriagecrest Park Stormwater
Project
Carson 42 $ 13,000,000 Constructed Caruthers Park Bellflower 9 $ 13,000,000 Constructed Culver Boulevard Stormwater
Median
Culver City 18 $ 20,000,000 Constructed El Dorado Regional Project Long Beach 23 $ 12,000,000 60% Design Encanto Park Stormwater
Capture Project
Monrovia 6.5 $ 2,500,000 90% Design Finkbiner Park Stormwater
Project
Glendora 19 $ 18,500,000 90% Design -66-craftflwater"
engineering. Inc.
craftflwater“
engineering. Inc.
GATEWAY WATER MANAGEMENT AUTHORITY Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects Section 1 – Company Qualifications and Experience Page 1-5 Project Name Project
Developer
Treatment
Volume
(AF)
Construction Cost Project Status
Fe
a
s
i
b
i
l
i
t
y
St
u
d
y
Pr
e
l
i
m
i
n
a
r
y
En
g
i
n
e
e
r
i
n
g
Fi
n
a
l
De
s
i
g
n
Ge
o
t
e
c
h
n
i
c
a
l
In
v
e
s
t
i
g
a
t
i
o
n
Pe
r
m
i
t
s
Co
n
s
t
r
u
c
t
i
o
n
SC
W
Re
p
o
r
t
i
n
g
Pu
b
l
i
c
Ou
t
r
e
a
c
h
Fairplex Stormwater Capture
Project
Pomona 22 $ 23,500,000 10% Design Furman Park Stormwater
Capture and Infiltration Project
Downey 9 $ 12,300,000 60% Design Heartwell Park at Palo Verde
Channel Stormwater Capture
Project
Long Beach 24 $ 18,500,000 10% Design Lynwood City Park Stormwater
Capture Project
Lynwood 26 $ 18,000,000 60% Design Mayfair Park Lakewood 23.8 $ 15,000,000 Constructed Merced Ave Stormwater
Capture Project
El Monte 1.0 $ 9,800,000 10% Design Rio Hondo Ecosystem
Restoration Project
Monrovia 18.5 $ 20,000,000 10% Design Salt Lake Park Huntington
Park
23.6 $ 25,000,000 10% Design
Santa Monica Clean Beaches
Initiative at the Pier
Santa Monica 6.0 $ 16,000,000 Constructed Skylinks Golf Course at Wardlow
Stormwater Capture Project
Long Beach 22.6 $ 10,500,000 90% Design Spane Park Paramount 20.4 $ 18,900,000 90% Design York Field Park Whittier 28.2 $ 25,500,000 60% Design -67-craftflwater‘
engineering. Inc.
craftfiwater"
engineering. Inc.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects Section 1 – Company Qualifications and Experience Page 1-6
SPANE PARK REGIONAL STORMWATER CAPTURE PROJECT
Paramount, CA
CLIENT REFERENCE
Adriana Figueroa; Public Works Director
562-220-2020
[email protected]
PROJECT TEAM
• Oliver Galang | Responsible Principal
• Courtney Semlow | Design Project Manager
• Merrill Taylor | Water Quality Technical Lead
• Thom Epps | Water Quality Scientist
PROJECT DATES
March 2019 – Present
PROJECT COST PERCENT PERFORMED
$18.9M 60%
PROJECT SUMMARY
The development of the Spane Park Stormwater Capture Project in the City of Paramount represents a major opportunity to enhance Spane Park within the City and continue the regional scale progress to achieve pollutant load reductions for the Lower LA River Watershed. Craftwater completed a Feasibility Study including the 10% Preliminary Design used to secure $1.5M in funding for the design and $18.9 Million for construction from the Safe, Clean Water Program (SCWP).
Stormwater flows are diverted from a double 10.5’W x 6.5’H RC Box storm drain at a rate of 20 cfs before being pumped to a 54” pipe that is conveyed to an existing 6’ wide bottom trapezoidal channel. Flows are conveyed 1.1 miles downstream to the project site where flows are diverted to a 5.4 ac-ft subsurface storage and treatment system. The facility has been optimized and has the capacity to treat 20.4 AF of stormwater for each storm event.
Our team prepared the Feasibility Study for submission to the SCWP for funding in October 2020. After the City of Paramount received funding, Craftwater was selected to continue to carry the project through final design. The design has progressed to 90% design. Craftwater assisted the City of Paramount with obtaining $18.9 Million in funding for construction under the Safe, Clean Water Program.
-68-
GATEWAY WATER MANAGEMENT AUTHORITY General On-Call Professional, Technical and/or Engineering Services Section 1 – Company Qualifications and Experience Page 1-7
SIMMS PARK REGIONAL STORMWATER CAPTURE PROJECT
Bellflower, CA
CLIENT REFERENCE
Len Gorecki; Assistant City Manager/Director of Public
Works
(562) 804-1424 ext. 2259
[email protected]
PROJECT TEAM
• Oliver Galang | Responsible Principal
• Merrill Taylor | Project Manager
• Courtney Semlow | Design Manager
PROJECT DATES
March 2022 – Present
PROJECT COST PERCENT PERFORMED
$15.7M 60%
PROJECT SUMMARY
Craftwater Engineering, Inc, is supporting the City of
Bellflower with the development of the City’s next regional stormwater BMP for the Los Cerritos Channel Watershed.
The goal of the project is to help the City comply with bacteria and metals TMDLs, as presented in the Los Cerritos Channel Watershed Management Program while providing
additional benefits of park revitalization. This project will capture discharge from a 758-acre area from the
10’Wx7.5’H RC Box Storm Drain along the west side of the park. The objective of this project is to address the water quality needs, particularly the metals TMDLs. The facility will redirect all dry weather and wet weather runoff from the storm drain through the diversion system and pre-
treatment system to remove trash, debris, and sediment. A drainage pipeline will convey the flows into a large, buried, multi-chambered storage and infiltration facility.
As part of this project, Craftwater Engineers prepared the Project Concept and Feasibility Study that met all criteria for the Safe, Clean Water Program and secured $2.1 Million for design of this facility. Craftwater is also preparing the construction documents to support the construction of this facility. Craftwater also assisted the City with securing $13.7 Million in funding for construction under the Safe, Clean Water Program.
-69-
GATEWAY WATER MANAGEMENT AUTHORITY General On-Call Professional, Technical and/or Engineering Services Section 1 – Company Qualifications and Experience Page 1-8
STORMWATER CAPTURE PROJECTS AT BOLIVAR AND MAYFAIR PARK Lakewood, CA
CLIENT REFERENCE
Kelli Pickler; City of Lakewood
562-866-9771, Ext 2501
[email protected]
PROJECT TEAM
• Oliver Galang | Project Manager
• Chad Helmle | Responsible Principal
• Merrill Taylor | Water Quality Technical Lead
• Thom Epps | Water Quality Scientist
PROJECT DATES
August 2015 – September 2023
PROJECT COST PERCENT PERFORMED
$11M and $15M 100%
PROJECT SUMMARY
As major steps towards implementing the Los Cerritos
Watershed Management Plan, the Craftwater Team
supported the City of Lakewood with implementing what are considered the first “smart regional stormwater BMPs” in Los Angeles County. The projects consist of air-inflated rubber dam diversion systems to re-direct runoff from both open and underground channels through pre-treatment systems to
remove trash, debris, and sediment. Pump stations and
drainage pipelines convey the pretreated water into large, buried multi-chambered storage/infiltration facilities.
Stormwater collected in the underground reservoir is treated and used to irrigate the park. Excess water at Bolivar Park is infiltrated, while Mayfair Park employs a flow-through
filtration system and an optional diversion to the sanitary sewer. The team modeled the performance of the facilities to demonstrate progress towards compliance, and evaluated the advantages of using smart, real-time controls to optimize system performance. Craftwater Engineers supported the City with the development of the design documents, obtained the LACFCD diversion permits, provided technical support during construction, and prepared the operations and maintenance manuals.
Craftwater also supported the City with the post-construction performance evaluation, modeling analysis, and developed the stormwater facility retrofit strategy at Bolivar Park for improved access and maintenance.
-70-
GATEWAY WATER MANAGEMENT AUTHORITY General On-Call Professional, Technical and/or Engineering Services Section 1 – Company Qualifications and Experience Page 1-9
STORMWATER MAINTENANCE SERVICES
BY DOWNSTREAM SERVICES, INC (O&M Services)
CLIENT REFERENCE
See below
PROJECT TEAM
• Robert Carr | Project Manager
• Aaron Santamaria | Superintendent
• Rebecca Readel | Assistant Project
Manager II
PROJECT DATES
March 2019 – Present
PROJECT COST PERCENT PERFORMED
$100k to $3.6M 100%
PROJECT SUMMARY
Downstream has provided stormwater cleaning services for over 15 years, including the City of Oceanside, City of Newport Beach, the City of Carlsbad, the City of El Cajon, and the City of Irvine within the last 5 years.
Client Contract
Years
Scope Annual $
City of Culver City
Sean Singletary, Sr.
Civil Engineer
(310) 253-6000
2021 - 2026 Inspections, repairs, and maintenance
services on stormwater pumps, actuator
valves, underground galleries, Kraken units,
CDS units, inlets, and junction structures per
the manufacturer O&M manual
$1,395,660
Current Contract
City of Irvine
Byron Gemmell, PW
Supervisor
(949) 724-7691
2023-2026 (14) Contech Cartridge Filter Vaults containing a total of (160) cartridge filters. Remove and
replace filters with vault cleaning.
$87,244
Annually
LAX – LAWA
Conor Roche, Maint.
Supervisor
(424) 646-7960
2019-2024 As-needed maintenance of Storm Drain Inlets,
Drywells, Underground Detention Basins,
Porous Pavers, and Bioswales. Includes
additional maintenance of (2) Contech
Cartridge Filter Vaults with (660) Cartridges in
one unit and (460) in another.
$3,600,000
Current Contract
-71-
C Services, Inc. Services, Inc. ION"
t‘
GATEWAY WATER MANAGEMENT AUTHORITY General On-Call Professional, Technical and/or Engineering Services Section 1 – Company Qualifications and Experience Page 1-10
STORMWATER TRAINING SERVICES
BY BLACK & VEATCH (O&M and Construction)
CLIENT REFERENCE
Chris Lee, PE, Associate Civil Engineer
Los Angeles County Public Works
(626) 300-4652
PROJECT TEAM
• Sean Porter, QSD/P, CPESC | Project Manager
PROJECT DATES
March 2019 – Present
PROJECT COST PERCENT PERFORMED
$1.1M 100%
PROJECT SUMMARY
Funded under SCWP, Black & Veatch is developing stormwater training videos for four stormwater capture and reuse projects in Los Angeles:
• East Los Angeles Sustainable Median Stormwater Capture Project • Ladera Park Stormwater Capture Project
• Gates Canyon Park Regional BMP Project
• Adventure Park Multi-Benefit Stormwater Capture Project The purpose of the videos is to introduce and identify the stormwater system components at each facility, Health and Safety elements and water quality and BMP effectiveness monitoring methods. The content developed is multi-platform, meaning it can be delivered in a variety of ways and through almost any device.
This is especially useful as field staff could want a quick “refresh” of certain content before they perform an activity in the field. Content can also be multi- language and captioned if desired. -72-
BLACK 8:
VEATCH
BLACK 8:
VEATCH
GATEWAY WATER MANAGEMENT AUTHORITY General On-Call Professional, Technical and/or Engineering Services Section 1 – Company Qualifications and Experience Page 1-11
THE CAMPUS HE CAMPUS AT HORTON
BY EPIC CLEANTEC (Stormwater Harvesting and Reuse)
CLIENT REFERENCE
Available upon request
PROJECT TEAM
Eric Hough, PMP, Project Executive
Adaptive reuse project featuring office spaces, life science facilities, retail outlets, and dining establishments The Campus at Horton is a 1,000,000 square foot redevelopment project located in San Diego, CA that will reinvent a formerly abandoned mall into a lively community complex with beautiful office spaces, life science facilities, retail outlets, and dining establishments.
The project will reuse roughly 55% of its water by deploying Epic’s OneWater™ system to capture and treat 24,000 GPD of wastewater for treatment and reuse in cooling tower makeup and flushing throughout the campus. The blackwater system will recycle over 7.5 million gallons per year, saving over $170,000 per year in water and sewer fees. Epic Cleantec is overseeing the design, permitting, and startup commissioning for this innovative project.
-73-
O ' g & eplccleantec O 0 g & eplccleantec
GATEWAY WATER MANAGEMENT AUTHORITY General On-Call Professional, Technical and/or Engineering Services Section 1 – Company Qualifications and Experience Page 1-12
ALBION RIVERSIDE PARK STORMWATER IMPROVEMENTS
BY Projectline Technical Services (SCADA Design and
Operations Services)
CLIENT REFERENCE
Bryan Powell, Senior Civil Engineer
City of Los Angeles, Bureau of Engineering
[email protected]
PROJECT TEAM
Robert Getter, PE, Electrical and Controls Design, SCADA
PROJECT SUMMARY
ProjectLine provided electrical design for site improvements on the City of Los Angeles Proposition O project.
The Institute for Sustainable Infrastructure (ISI) named the project as recipient of the 2020 Envision® Gold award for sustainable infrastructure for delivering a heightened range of environmental, social, and economic benefits to the host and affected communities. Design for the 6-acre site included BMPs to improve water quality of stormwater prior to discharging to the Los Angeles River, and upgraded outdoor sports fields, park areas, and parking areas. The project provided multiple benefits to the neighborhood by creating visual linkages to the Los Angeles River and linkages to other projects referenced in the Los Angeles River Revitalization Master plan. ProjectLine’s electrical design included innovative LED lighting for sports fields and park areas based on photometric modeling, with PC-based programmable lighting controls, and meeting the latest City lighting standards.
-74-
ProjectLine
Technical Services, Inc.
ProjectLine
Technical Services, Inc.
Organization and
Key Personnel
SECTION 2
-75-
craftlEiwater craftiwwater"
“WON 2 Organization and
~- ‘ Km P-
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects
Section 2 – Organization and Team Members Page 2-1
2| ORGANIZATION AND TEAM MEMBERS
PROJECT MANAGEMENT TEAM AND KEY
TEAM MEMBERS
Craftwater carefully assembled a specialized team
of nationally respected experts with local
experience serving the GWMA. We deliberately
selected each member of our team to fill a
specialized role and best serve the GWMA—each
partner’s experience, qualifications, and technical
resources is complementary and focused on the
specific tasks of this Statement of Qualifications.
The organizational chart below outlines our staffing
plan, and the following resumes highlight the
outstanding qualifications of our key staff.
The following figure in the next page, Figure 3-1,
presents the Craftwater Project Team organization,
and resume summaries below highlight key
qualifications and experience of our team. The
Craftwater team of experts combine years of
applied experience in municipal public works and
consulting with an unmatched drive to deliver
interesting solutions. Our team does not tolerate
generic, plug-and-chug methodologies—instead,
we are constantly innovating and using new
technology to develop better projects and dynamic
plans customized to specific goals of our clients.
Our leaders’ experiences roles, responsibilities,
credentials, and related experience are introduced
in the following pages.
Resumes for Key Team Members are also available
in Appendix A. Resumes.
“Craftwater’s knowledge of the
project as well as regional
stormwater issues make them a
practical choice to continue the
design of the project”
- City of Paramount Staff Report
(February 2022)
-76-craftflwater‘
engineerlng. inc.
craftflwater"
engineerlng. inc.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects
Section 2 – Organization and Team Members Page 2-2
Figure 3-1. Proposed Organization Chart
-77-
Program Administrator QA/QC Manager
Chad Heln‘ie, PE Oliver Galang PE. ENVSP
Project Management Team
Merrill Tm PE
Pauline Nguyen. PE
Andrew Takahashi. PE
Yulun Wu. PE
Technical SupportTeam
Operatbns and Maintenance Construcljon/Repair Engineerirgand Technical Senrices
Sean nfl CourtngSemlow E ENVSP CourtgSernlow E ENV SP
. . Andrew Takahashi. PE. ENV SP. QSD mm, PE Mast m... "3 Robert Cane Shane Sasaki. Err Dan Zarraonandi' VManaSamM" “Nazarene“ Robert Getter, Pw Diversion and Pretreatment
Robert Care Stormwater HawesljngSystem
Eric Hough. PM . 3 _ SCA DA Systems Operations Stgfmwater Harvesting 3% Richard Ross. P = 3 — _ _ Enc Hough, PMFG ReporhrrgServms Sean Portela Paul'ne Nglfl pE ROPE“ Getter, Pw M. ;A Sflems and §gn§9rs Kathy Gee. PE. Phlfl Shane Sasaki, Err Heather Kurtzman. EIT
Robert Getter. P9 Kathy Gee. PE. Pmfl
0 Black andVeatch 9 Epic ClanTec o Pre-Con
550 8 Hope St, Suite 2250 8425 Market St. 240 W Los Angeles Ave Los Angeles. CA 90071 San Francisco, CA 94103 Simi Valley. CA 93065 o Downstream Services. Inc 0 Opti o Projectline
2855 Progress Place
Escondido. CA 92029
98 North Washington St.
Boston. MA 02114
2900 Bristol. Ste 0103,
Costa Mesa, CA 92626
craftflwater‘
engineerlng. inc.
Operationsand Maintenance
Sean PM
Robert Cane
Robert Getter, P89
Stonnwater HarveaingSystem
Eric Hough. PM 3
Richard Ross. P' 3
Paul'ne N PE
Shane Sasaki, Err
Heather Kurtzmari. EIT
Program Admin istmtor
Oliver Galang PE, ENVSP
QA/QC Manager
Chad Helrrie, PE
Project Management Team
Merrill Tm. PE
Pauline Nguyen. PE
Andrew Takahashi. PE
Yulun Wu. PE
Technical SupportTeam
Emma“ — Techninl Senricis 6°"m Repair
Counn 86mm ENVSP CourlnfiSemIOlME ENVSP
Andrew Takahashi. PE. ENV SP QSD
Yulun Wu PE fleCast Reservgirs
Shane Sasaki, Eff Dan Zarraonandi
Viviana Sanchez, EIT David Zarraonandifi
Diversion and Pretreatment
Robert Cara
SCA DA system Operations
Sean Porteio
Stgmwater Harvesting Sy§tem
Eric Hough, ewe
Robert Getter, Fifi MA Sfitems and §gn§grs Kathy Gee. PE. Pnlfl Robert Getter. P9 Kathy Gee. PE. Pblfl o BlackandVeamh
550 8 Hope St, Suite 2250
Los Angeles, CA 90071
Downstream Services, Inc Opt] 9 2855 Progress Place
Escondido, CA 92029
Epic ClonnTec
8425 Market St.
San Francisco, CA 94103
a Pre-Con
240 W Los Angeles Ave
Simi Valley, CA 93065
Projectline
2900 Bristol, Ste D-103,
Costa Mesa, CA 92626
98 North Washington St
Boston, MA 02114
craftflwater"
anglneerlng. inc.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects
Section 2 – Organization and Team Members Page 2-3
OLIVER GALANG, PE, ENV SP
Program
Supervisor/Administrator
Time: 40%| Pasadena, CA
Oliver Galang leads
Craftwater’s design and
management services and
provides experience encompassing 30 years of planning,
design, construction, and program management of
multi-million-dollar municipal capital improvement
projects, specifically in water resources and stormwater infrastructure throughout Los Angeles County.
Highlights of Oliver’s career also include service as the Head of the Los Angeles River Watershed and for the
Water Quality Monitoring Programs for the Los Angeles
County Flood Control District. His responsibilities
included leading the planning of multi-use, multi-benefit projects, with an estimated construction value of more
than $60 million, along the Los Angeles River. He has also been responsible for managing programs of more than
$10 million in urban runoff and stormwater quality
monitoring programs. Oliver’s role and level of
involvement in the projects listed in the qualifications are summarized below:
• Principal-In-Charge. Oliver serves as the responsible Principal for the design of the following Safe, Clean
Water Projects: Bellflower Simms Park Stormwater
Project, Downey Furman Park Stormwater Project,
Lynwood Park Stormwater Project, and Paramount
Spane Park Stormwater Project. His depth of
municipal experience and project design experience
ensure that the design, funding, and construction
implementation of stormwater facilities proceed in
the most expeditious manner. In addition, this
experience along with his years supporting the
LACFCD will ensure that regional stormwater BMPs
are operated and maintained to meet the water
quality objectives of each project.
CHAD HELMLE, PE
QA/QC Manager & Principal-
in-Charge Time: 10%, San
Diego, CA
As President of Craftwater,
Mr. Helmle offers national
experience with a focus on the
Southern California water
resources service area. He has overseen hundreds of
large and small water resources projects and has served as program manager or principal-in-charge of several of the largest municipal on-call stormwater-focused
contracts in the country. His experience encompasses
more than 23 years of relevant experience evaluating
and addressing a broad spectrum of water issues,
ranging from strategic planning to design and
implementation. Examples of his project leadership
include hundreds of square miles of watershed master
planning efforts, over 100 regional-scale green
infrastructure retrofit design or pre-design projects, and ground-breaking watershed and BMP modeling analyses.
He is especially passionate about finding innovative
solutions to the challenging prospect of retrofitting
existing urban landscapes and infrastructure to meet the compliance, water resiliency, and runoff management
needs of municipal agencies.
MERRILL TAYLOR, PE
Project Management
Team Lead
Time: 50%, Pasadena and
San Diego
Merrill is a Senior Civil
Engineer and brings more
than 14 years of
experience leading regional stormwater capture design
and BMP Operations and Maintenance services
throughout California. For this project, Merrill will lead the project management team to ensure all of the
GWMA Stormwater BMPs are properly operated and
maintained during dry-weather and wet-weather
periods. He is an expert with BMP facilities and the
associated diversions, pretreatment, storage, and
overflow infrastructure ensuring that all hydraulic and structural needs are met by the proposed practices while remaining cost conscience. He’s previously played a key role in the design of 12 regional stormwater capture
projects totaling over $150 million in construction costs including Bolivar Park and Mayfair Park Stormwater
Capture Projects in Lakewood, Adventure Park Multi-
Benefit Stormwater Capture Project near Whittier, and
Caruthers Park Stormwater and Runoff Capture Project
in Bellflower.
-78-craftflwater"
engineerlng. inc.
craftflwater‘
engineerlng. inc.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects
Section 2 – Organization and Team Members Page 2-4
COURTNEY SEMLOW, PE,
CFM, ENV SP
Engineering Services and
Construction/Repair Lead
Time: 40%|Pasadena, CA
Courtney is a Project Design
manager with 18 years of
professional experience in
site design and water resources projects. Her in-depth
site design experience has installed a strong engineering toolbox enabling her to identify potential pitfalls that can be detrimental to projects. She is knowledgeable in all aspects of civil design, including erosion control, utilities, and stormwater capture design. She is leading the
design disciplines for the Arroyo Seco San Rafael
Treatment Project, Encanto Park Stormwater, Finkbiner
Park Stormwater, and Lynwood City Park Stormwater
Capture Projects. As the Design Manager, Courtney will
serve as the primary point of contact to lead the design development teams and ensure prompt responses and
transparency on behalf of the Craftwater team. She will ensure that all tasks proceed on schedule, meet
necessary milestones, and produce high quality
deliverables that meet project and client goals.
Courtney’s management and practical design experience
provides her with a full understanding of the design
options within the California landscape and regulatory
context. Her projects are customized for the project
goals and environmental settings; consistent with
existing regulations and policies and stakeholder
preferences; and, most important, are constructible,
realistic, and will operate as designed to meet project goals.
SEAN PORTER, CPSWQ,
QSD/P
Stormwater O&M Lead (Black
& Veatch)
Time: 60% | San Marcos, CA
Sean Porter has 24 years of
experience specializing in water
resource services with a
background in stormwater, wastewater, urban and
natural landscape, creek watershed studies, and
groundwater. He is an expert in stormwater green
infrastructure (GI), MS4 Permit compliance, NPDES
permit program requirements, Areas of Special
Biological Significance (ASBS) discharge requirements,
total maximum daily loads (TMDLs) allocations and
monitoring, and publicly funded research‑driven
watershed studies. His experience includes consulting,
training, monitoring and reporting for GI and trash
capture projects for state, municipal, transportation,
federal, and low impact development. Mr. Porter will be responsible for coordinating with the Project
Management Team to schedule the routine
maintenance protocols. Currently an Industrial General Permit (IGP) Trainer of Record (ToR), Qualified Industrial Stormwater Practitioner (QISP), he develops innovative
solutions that enhance quality, maximize efficiency,
improve safety, and increase responsiveness.
ROBERT GETTER, PE
SCADA Operations and
Engineering Lead
Time: 40%| Costa Mesa,
CA
Mr. Getter has over 30 years of
experience in electrical and controls engineering and
design, much of which has been for water-related
facilities. His expertise includes design of stormwater diversion and pump stations, sports lighting, and sports park upgrades. He has been involved in over 12 similar
stormwater diversion and pumping projects in the past 5 years. His experience includes design of over $500
million construction value for infrastructure facilities.
Mr. Getter will be leading the SCADA Design and
Implementation Team to evaluate the SCADA
Operations, Monitoring Systems, and potential
integration opportunities for the GWMA.
ERIC HOUGH, PMP
Water Reuse/Stormwate
Harvesting Lead
Time: 40%| Carlsbad, CA
Mr. Eric Hough has over 17
years of water reuse project
delivery experience that spans
engineering and project management. Eric is responsible for laying the foundation for success in each of Epic’s projects. By maintaining a focus on the business case for water reuse, Eric thrives on connecting development
projects with the best, value-driven water conservation solutions.
-79-craiftflwater"
n neerlng. inc.
craftflwater‘
engineerlng. inc.
Project Approach
and
Understanding
SECTION 3
-80-
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects Section 3 –Approach & Understanding Page 3-1
3| PROJECT UNDERSTANDING AND APPROACH
UNDERSTANDING OF SCOPE
The GWMA is a large watershed-based coalition of cities, water agencies, and a port. The GWMA member agencies
are located in the southeastern area of the Los Angeles County and are responsible for addressing regulatory
compliance under 4 watershed groups for the Lower LA
River Upper Reach 2, Lower Los Angeles River, Lower San Gabriel River, and the Los Cerritos Channel watersheds.
Together, Craftwater engineers (in their capacities at
previous firms) worked closely with these permittees to develop the WMPs as an initial plan to protect the region and stormwater management and to secure interim
compliance with the regional MS4 Permit.
During the years since the WMP development, the
engineers at Craftwater have derived great personal
satisfaction with assisting the agencies within the GWMA and around Los Angeles County with watershed master
planning to identify and prioritize specific projects,
evaluating project feasibility per the SCWP guidelines, and preparing construction bid documents for the
implementation of the most advanced stormwater
capture facilities ever developed in the Los Angeles area.
Some of the first Regional BMPs were designed and
constructed in the GWMA Watersheds by the Craftwater
engineers. Craftwater clearly understands and
internalizes the challenges facing the GWMA because we
have personally and continuously worked with all of the watersheds (LARUR2, Lower LA River, Lower San Gabriel
River, and the Los Cerritos Channel), and our core team members have been active in the watershed for over a
decade. We feel ownership in the success of this group
and have staked our reputation on it.
The GWMA member agencies seek the assistance of
experts in regional stormwater capture facilities to
provide Operations and Maintenance, SCADA controls
and monitoring, and evaluation services of Regional
Stormwater Capture and Treatment Projects to optimize
performance as well as construction work that may be
required to optimize the facility or enhance the
operations and enable maintenance access of these
facilities.
HISTORY WITH THE 5 REGIONAL PROJECTS
Craftwater Engineers have supported the GWMA member
agencies with the implementation of the five regional
projects. Also, our team has been directly supporting the GWMA member agencies with the initial assessment of 4
of the 5 regional projects at Bolivar, Caruthers, Mayfair, and Sub-Basin 4 (Long Beach Airport). In addition,
Craftwater Engineers were involved at the early stages of analysis and sizing of the Urban Orchard Project.
HISTORY WITH THE ADDITIONAL REGIONAL
PROJECTS
Craftwater Engineers have also been integral with the
development of all the regional projects that are
anticipated to be constructed by the GWMA member
Our team developed tools to evaluate the operational
infiltration rates and recommended optimization strategies for the Bolivar Park BMP treatment facility
-81-
o‘u—J
5' m1
- - «on 5mm yum yum ml ml m1 mm
momma;- mum“: sum-gm)
craftflwater‘
engineerlng. inc.
WI 5mm MI WI 5mm mom mm
m 0mm Whom Hr. WM)
craftflwater‘
anglneerlng. inc.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects Section 3 –Approach & Understanding Page 3-2
agencies. In fact, Craftwater is the only firm that can claim to have prepared all the Safe, Clean Water
Program feasibility studies that were the basis for
Hermosillo Park, El Dorado Regional, Furman Park,
Simms Park, Spane Park, John Anson Ford Park, Apollo
Park, Independence Park, Cerritos Sports Complex,
Lynwood City Park, Heartwell Parks (Palo Verde and
Clark Channels), Skylinks Golf Course, and Salt Lake Park.
In addition, Craftwater is leading the design and
successfully secured construction funding under the Safe, Clean Water Program for Furman Park, Simms Park, Spane
Park, and Lynwood City Park.
APPROACH TO SERVICE CATEGORIES
The Craftwater Team’s experience with BMP operations,
monitoring, and maintenance dates back to 2000 with
early studies with Caltrans in the Los Angeles region that have guided the direction of many BMPs currently
implemented regionally and nationally. Our
understanding of BMP effectiveness is not only rooted in direct monitoring experience, but also based on a long
history of BMP engineering, analysis, and design. In the past ten years, our Team members have designed more
regional and green infrastructure projects in Southern
California than any other group. Because of our Team’s in- depth engineering knowledge of BMPs, along with
extensive monitoring experience, we offer a unique
perspective on the “operability and performance” of
BMPs to properly evaluate their effectiveness.
Specifically, our comprehensive Team has led the design and monitoring plans for more Safe, Clean Water
Program-funded projects than any other firm, so we are
able to incorporate monitoring early in the design phases; we avoid overlooking key access points within the BMP to collect accurate flow data and representative samples.
TASK 1. OPERATION AND MAINTENANCE
(O&M)
The Craftwater Team has been assembled to provide for
O&M of the various facilities in accordance with the
established O&M Manuals for each facility.
Craftwater will review the facility-specific Operations and Maintenance (O&M) Plans for each of the existing
Regional Stormwater Capture and Treatment Projects,
inspection and system maintenance activities are
conducted regularly. Beginning with regular inspections to determine whether the system is properly functioning, and operating as designed, sediment and trash
accumulation is documented. Inspection reports identify and document all potential problems and inform
maintenance activities. Our Team’s continuous approach
to the Operation and Maintenance, Monitoring, and
Optimization of stormwater BMPs ensures through our
efforts that each municipality is receiving the most value possible from your operating assets. This requires a focus on frequent inspections, thorough documentation and
reporting, and timely deployment of the cleaning and
vactor equipment.
Craftwater’s Services include the following team
members.
• Craftwater’s Project Management Team. Our
project management team will be responsible for
the overall management of these facilities. We
will assign an individual Project Manager who will
be responsible for the overall operations and
maintenance of each facility.
• Black & Veatch will conduct an evaluation of the
O&M Plans and establish the maintenance
schedules.
• Downstream Services will provide routine
cleaning of stormwater infrastructure including
the rubber dam and diversion structures, pumps,
valves, removing sediment and trash from
structures.
• Black & Veatch, Projectline, and FMF Pandion
will provide services for the testing and
Craftwater Engineers were responsible for developing
over one-third of the Feasibility Studies submitted for funding under the Safe, Clean Water Program
-82-craftflwater‘
engineerlng. inc.
craftfiwater"
engineering. Int.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects Section 3 –Approach & Understanding Page 3-3
calibration of monitoring equipment, SCADA
control systems, and other electrical equipment.
• Access to LACFCD Channel. Since each project
has an establish LACFCD Use and Maintenance
Agreement, our team will coordinate with the
local LACFCD Maintenance Yard when accessing
the channel/storm drain for maintenance.
• Sanitation Districts of LA County. The Mayfair
Park Project has a discharge option to the sanitary
sewer. The status of the discharge permit will be
reviewed by Craftwater to ensure that the
coordination (including SCADA access) is
established with the Sanitation Districts.
• Stormwater Harvesting Units and the LA County
Public Health. In order to use the stormwater
harvesting facility, the Sampling Plan must be
followed as required by the Cross Connection
Permits for the use of stormwater as irrigation
water at Bolivar, Caruthers, and Mayfair. Our
team includes Epic CleanTec, who provides
operation and maintenance services for these
systems.
Confined space entry is required at several facilities to maintain and clean these assets. Necessary protocols for work around open-access structures and confined spaces
will be strictly followed per OSHA standards, regulations, and procedures for work in confined spaces.
Considerations for Operation and Maintenance
The following summarizes our strategies that we’ll bring to each Regional Project:
• Data collection during operation and
maintenance of key assets including regional
stormwater capture and water quality treatment
systems, low-flow diversion dams, pre-treatment
systems, trash capture devices, and all associated
monitoring equipment.
• Stormwater Harvesting Systems. Leverage our
detailed knowledge of the existing site conditions
as well as innovative technologies that support
effective water quality treatment and
downstream impact mitigation such as complex
water harvesting treatment systems. For
example, our review of the Wahaso systems at
Bolivar, Caruthers, and Mayfair determined that
the waste stream needs from the system should
not be returned to the storage reservoir.
• Monitoring System evaluation. Craftwater will
review the monitoring data from each SCADA to
determine the operational status of the various
sensors (water level, flow, and turbidity). Our
SCADA systems team includes scientists and
engineers that will support the GWMA agencies
with setting up systems to provide access and
enable real time evaluation.
• Stormwater Infrastructure. Several Projects are
equipped with controls such as valves, inflatable
dams, pumps, flowmeters, and sensors. The
water harvesting systems are equipped with a
wide variety of smaller filters and sensors as well.
Our Team provides the expertise in operating and
maintaining all of the equipment fitted in each
Project location. This includes troubleshooting
and programing logic controllers (PLCs).
Craftwater’s review of the infrastructure
determined the following priorities to enhance
the maintainability of these facilities.
o Pre-Treatment Systems. The potential for
overflow and bypass of flows and sediments
will affect the long-term use of the subsurface
storage structure and sustainability of
infiltration.
The Craftwater team worked closely with the LA
County Public Health to approve the first stormwater
capture facility permitted for spray irrigation use
-83-craftflwater‘
engineerlng. inc.
craftfiwater"
engineering. Int.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects Section 3 –Approach & Understanding Page 3-4
o Access for Maintenance. Access for the
vactor trucks and for personnel is necessary
to ensure the facility will continue to function.
TASK 2. SCADA SYSTEMS
Our team will review the existing SCADA systems that
have been implemented at each of the projects to
allow for remote monitoring and control of these
projects. Craftwater will utilize the services of
Projectline to assist with the management of these
projects. Craftwater also has included Opti to our
team to provide for active controls, optimization, and
multi-project management of the GWMA facilities.
The Opti approach integrates the rainfall forecast to
improve the systemwide management of the GWMA
Facilities. The potential to integrate Opti for the
GWMA can be evaluated and allow for the GWMA to
oversee all of these facilities simultaneously as well.
Regional stormwater capture project performance
is driven by the amount of water the system
receives (inflow), the volumetric capacity (storage),
and the method of treating and draining the tank
(outflow). Each of these three variables—inflow,
storage, and outflow—are interrelated and the
adjustment of one will directly change how the other
two perform (e.g., restricting the inflow rate is
equivalent to “sucking through a straw” and will limit
the amount of pollutants an otherwise large storage
tank may have access to treat; conversely, an
undersized storage tank is rapidly overwhelmed by
an overdesigned inflow diversion and may fill too
soon without capturing the dirtiest peak of the
storm). Our experience has proven that it is essential
to evaluate these three parameters simultaneously
when looking at the design and performance of a
regional practice. The model can evaluate select
pollutants or volume, giving the design team the best
combination for maximizing performance and
multiple benefits. A strategic deployment of
environmental sensor technology is crucial to enable
an adequate assessment of the infrastructure’s
performance in the future.
TASK 3. ENGINEERING AND TECHNICAL
SERVICES
Craftwater’s team of design engineers are available
to assist the GWMA agencies with development
system improvements to further enhance the
operations and maintenance of these Projects or to
enhance the water quality benefits. Craftwater led
the assessment of the Los Cerritos Channel Regional
BMPs, which include Bolivar Park, Caruthers Park,
Mayfair Park, and Sub-Basin 4 Projects.
Craftwater’s design team will develop design
drawings that can be used to install facility access
improvements, such as subsurface storage access
shaft, trash screens, or trash bypass deflector devices for the pre-treatment units. In addition, water
quality benefits can be improved at Bolivar Park and
Caruthers Park with the addition of a post-treatment
filtration unit coupled with the existing discharge
pumps.
Members of the Craftwater Team developed and led
some of the inaugural BMP monitoring programs in
California over 20 years ago for Caltrans and continue
to implement monitoring programs in Los Angeles
County. Our team was recently hired to support the
County with development of program- and BMP-
Craftwater Engineers led the development of the most
innovative stormwater capture facilities in the GWMA.
Mayfair Park SW Capture Project incorporated
pretreatment, filtration discharge, and sanitary sewer
discharge for optimal system performance.
-84-craftflwater‘
engineerlng. inc.
craftfiwater"
engineering. Int.
GATEWAY WATER MANAGEMENT AUTHORITY
Operation, Maintenance, and Evaluation of Regional Stormwater Capture and Treatment Projects Section 3 –Approach & Understanding Page 3-5
level monitoring strategies to evaluate Safe, Clean
Water Program success. The outcomes of Craftwater
engineers’ contributions to this project will help to
establish state-of-the-science protocols for new BMP
monitoring efforts.
In addition, our team has been responsible for the
feasibility analyses of 73 projects across California
including 56 submitted to the Safe, Clean Water Program Infrastructure Program, more than any other team in the region. Craftwater Engineers developed a monitoring
plan for each of these feasibility studies in order to
evaluate the pre-construction and post-construction/long term performance of regional structural BMPs. For
Adventure Park, our engineers managed the pre-
construction monitoring of Sorensen Drain. This involved obtaining the LACFCD access permit and approval of the
sampling equipment. The pre-construction water
quality data from the Sorensen Drain was used as
the basis for design optimization and for the sanitary
sewer diversion requirements.
TASK 4. CONSTRUCTION/REPAIR SERVICES
Our team includes the following subconsultants to
assist the GWMA Agencies with construction and
repair needs for diversion structures, pumps, valves,
and access to underground structures.
• Downstream Services. Standard or routine
repairs of equipment, screens, etc. will be
provided by Downstream Services.
• Black & Veatch which is an Engineering and
Construction Firm. This firm has the
capability to implement larger more complex
repairs, retrofits, and construction for these
projects. We will utilize this firm if the
installation of a small pump station or
filtration unit may be required.
• Pre-Con is a manufacturer of pre-cast
concrete structures and also a construction
contractor. Craftwater has recommended
that the subsurface storage structures at
Bolivar, Caruthers, and Mayfair could be
retrofitted with additional access shaft to
improve the ability to maintain these
structures.
The Craftwater Team will provide technical design
support and construction/repair services for the
GWMA.
-85-craftflwater‘
engineerlng. inc.
craftfiwater"
engineering. Int.
Appendix A Key Staff
Resumes
-86-
nc. engineering. —_u craftfit/flwater‘”
fey Sta"
"o'sumes
Engineering and
Technical Services
Courtney Semlow, PE, ENV SP
Andrew Takahashi, PE, ENV SP, QSD
Yulun Wu, PE
Shane Sasaki, EIT
Viviana Sanchez, EIT
Construction/Repair
Courtney Semlow, PE, ENV SP
Pre-Cast Reservoirs
Dan Zarraonandia5
David Zarraonandia5
Diversion and Pretreatment
Robert Carr2
Stormwater Harvesting System
Eric Hough, PMP3
SCADA Systems and Sensors
Robert Getter, PE6
Kathy Gee, PE, PhD4
Technical Support Team
Program Administrator
Oliver Galang, PE, ENV SP
QA/QC Manager
Chad Helmle, PE
SCADA Systems Operations
Sean Porter
Robert Getter, PE6
Kathy Gee, PE, PhD4
Operations and Maintenance
Sean Porter1
Maintenance Services
SCADA System
Robert Getter, PE6
Reporting Services
Pauline Nguyen, PE
Shane Sasaki, EIT
Heather Kurtzman, EIT
Robert Carr2
Stormwater Harvesting System
Eric Hough, PMP3
Richard Ross, PE3
Project Management Team
Merrill Taylor, PE
Pauline Nguyen, PE
Andrew Takahashi, PE
Yulun Wu, PE
Black and Veatch
550 S Hope St, Suite 2250
Los Angeles, CA 90071
Downstream Services, Inc
2855 Progress Place
Escondido, CA 92029
Epic CleanTec
8425 Market St.
San Francisco, CA 94103
Opti
98 North Washington St.
Boston, MA 02114
3 2
1 6
5 4
Pre-Con
240 W Los Angeles Ave
Simi Valley, CA 93065
Projectline
2900 Bristol, Ste D-103,
Costa Mesa, CA 92626
6 6
6 2
2 5
5 3
3 4
4 3
1 1
-87-
1' ' SAFE cLEM c _ mn— ‘PROGRAM
craftflwater
Chad S. Helmle, PE
President and Chief Executive Officer
Résumé 1
Experience Summary
As President of Craftwater Engineering, Inc, Mr. Helmle offers national experience with a focus on the Southern California water resources service area. He has overseen hundreds of large and small water resources projects and has served as program manager or principal-in-charge of several of the largest municipal on-call stormwater-focused contracts in the country. His responsibilities in these roles has afforded him the unique opportunity to explore a broad spectrum of stormwater-related issues, ranging from strategic planning to design and implementation. Examples of his project leadership include numerous green infrastructure master planning efforts, over 100 regional-scale green infrastructure retrofit design or pre-design projects, and ground-breaking watershed and BMP modeling analyses.
He is especially passionate about finding innovative solutions to the challenging prospect of retrofitting existing urban landscapes and infrastructure to meet the compliance, water resiliency, and/or runoff management needs of municipal agencies. He continually pushes the envelope to improve his team’s methods by inventing new processes, templates, and tools for creating effective and robust design concepts and modeling approaches for stormwater capture projects. This constant push for new approaches has yielded several key innovations, such as incorporating real-time control elements to boost BMP performance while meeting the integrated needs of watershed managers. As a former Air Force civil engineering officer, Mr. Helmle has brought the lessons learned to bear by developing cost-effective concepts for municipalities and numerous military installations alike, resulting in cost savings that spans into billions of dollars. Mr. Helmle strives to strike the ideal balance between form, function, and simplicity of operation.
Relevant Experience
As-needed Stormwater Engineering and Consulting Services, City of San Diego. Program Manager for a $25M, 5-year as-needed contract (2018 – 2019) and a $21.5M, 5-year as- needed contract (2014 – 2018) to provide the full spectrum of stormwater program support to the City, including all of the City’s Water Quality Improvement Plans, stormwater capital project design, special scientific studies, BMP research and development, compliance reporting, and general permit support. Managed one of the largest stormwater contracts of its kind, helping the City gain attention on a national stage, especially with regard to cutting- edge BMP master planning, stormwater design, and innovative permit compliance strategies. Managed over 100 task orders worth nearly $30 million. Signature projects completed as part of this contract include: (1) a comprehensive watershed master plan that utilized first-of-their-kind modeling approaches to strategically identify and prioritize regional and green infrastructure project opportunities; (2) an innovative regional stormwater harvesting analysis that demonstrated the degree to which local stormwater capture can feasibly and realistically augment water supplies by upwards of 25%; and (3) regionally- critical re-negotiation of bacteria TMDL requirements that will set the stage for reducing municipal bacteria mitigation requirements across the state.
Watershed Engineering On-Call Contract, County of Los Angeles. Principal in Charge for $6M, 3-year as-needed contract to support the county with wide-ranging watershed services, including the design of regional BMPs in parks, regional master planning work, and piloting of innovative regional stormwater capture programs. Work for the County was recognized at the national and regional level as precedent-setting, especially in terms of applying technical innovation to solve emerging stormwater problems. Signature projects that Mr. Helmle has personally led include (1) the Multi-Agency Collaborative Stormcatcher Project, which demonstrated the feasibility of leveraging parcel-based real time control systems to capture runoff and augment water supplies; (2) the Lower Los Angeles River Revitalization Plan, which emphasizes a watershed-based approach to revitalizing a 19-mile long, two-mile wide reach of the LA River corridor; and (3) multiple park-based regional stormwater capture BMP designs intended to meet pressing TMDL compliance needs.
EDUCATION
M.S., Civil Engineering,
Environmental Fluid
Mechanics/Hydrology, Cornell
University, 2005
B.S., Engineering and
Environmental Science,
University of Notre Dame, 1997
AREA OF EXPERTISE
Green infrastructure
Strategic planning
Stormwater master planning
BMP planning and engineering
Integrated water resource
management
Low impact development
BMP modeling
Hydromodification management
Stormwater management tool
development
Infrastructure assessment
Military civil engineering
Hydrology and hydraulics
Water quality modeling
Hydrodynamic modeling
Guidance development
REGISTRATIONS/
AFFILIATIONS
2006, Professional Engineer
(Civil), State of California (69525)
YEARS OF EXPERIENCE
22 years
CONTACT
Phone:
805-729-0943
Email:
[email protected]
LinkedIn:
linkedin.com/in/chad-helmle-
588ab11/
-88-
craftflflwater"
engineering. inc.
III
craft’fiwater"
engineering, inc.
Résumé Chad S. Helmle, PE
2 Support for the City and County of San Francisco’s MS4 Permit Implementation, San Francisco Public Utilities Commission (SFPUC).
Principal in Charge. Provided contract and technical oversight for a task order-based contract to provide technical support to the SFPUC Regulatory Compliance Division over a 5-year period by developing program components for compliance with each element of the 2013 Phase II Permit. Streamlined program management and met required milestones through a combination of program evaluation and planning, establishment of program priorities, development of standard operating procedures (SOPs), development of outreach and training materials, creation or revisions to tracking systems and databases, and other activities to improve the efficiency and effectiveness of the MS4 program.
Chollas Creek Watershed Master Plan, City of San Diego, San Diego, CA. Project Manager for first dynamic, web-based Watershed Master Plan within the City of San Diego that build off of the recommendations made by the approved Water Quality Improvement Plans (WQIPs) and identify project-by-project priorities that will contribute towards compliance with the MS4 permit and TMDLs. Based on a ground-breaking watershed modeling framework, the project provided a comprehensive and adaptive plan containing specific projects and identified synergies with other programs (i.e., CIPs, flood control, hydromodification, stream restoration), and eliminated the inefficiencies of incremental and opportunistic project conceptualization.
Master Plan of Drainage, City of Huntington Beach, CA. Project Manager for the Master Plan of Drainage (MPD), including updating storm drain geospatial data, rapid development and execution of hydrology and hydraulics (H&H) models, assessment of system deficiencies, and prioritization of proposed improvements. Modeling was completed using customized PCSWMM models that account for the low-lying topography within the watershed, as well as pump station boundary conditions.
Strategic Green Street Implementation Plan, Dominguez Channel Watershed Management Group, 2/2017-12/2018. Principal-in- charge of developing a watershed-wide, strategic 5-year green street plan for the 80-square-mile Dominguez Channel Watershed (the most impervious watershed in the Los Angeles Basin). Implemented a novel programmatic framework to efficiently identify and prioritize street-scale project opportunities throughout the watershed. Led team to apply state-of-the-science understanding of green infrastructure to customizing green street configurations to specific environmental conditions and pollutants of concern. Facilitated coordination between nine permittees to incorporate institutional preferences and synergies into prioritization of green street configurations and locations. Ensured clear communication of results using an interactive web-based mapping application to streamline multi-agency review and data transfer with city engineers/scientists/planners, and to enable transparency with regulators/non-governmental organizations.
Green Infrastructure Master Plan, City of San Diego, CA. Project Manager to create a green infrastructure master plan for a 7-square mile pilot area in the City of San Diego. While the WQIPs established well-documented water quality goals and identified specific stormwater capture targets for each individual subwatershed, they lacked the high-resolution data needed to identify specific project needs. This master planning effort leverages a number of key innovations to create new datasets that allow for the identification of specific project opportunities, quantification of their potential costs and water quality improvement, and prioritizes them based on their potential for synergy with other existing infrastructure programs in the City. This project will redefine what constitutes a green infrastructure opportunity by outlining specific project characteristics, evaluating strict feasibility criteria, and taking advantage of cost- saving techniques such as linking related projects and integrating real time controls. Ultimately, the output of this project provides a project-by-project master strategy for achieving compliance while focusing on high-efficiency projects first and leaving the low-efficiency projects for the end.
Cottonwood Creek Watershed LID Retrofit Plan, City of Encinitas – Project Manager. Collaborated with the City to develop a cutting- edge plan for the strategic implementation of green infrastructure to improve storm water quality and reduce the impacts of frequent flooding in the watershed. The approach involved engineering and modeling analyses to provide and a robust technical foundation for the study and a strong public outreach and training campaign designed to communicate the plan to the public and generate support.
A comprehensive summary of watershed conditions characterized pollutant loading issues, locates nuisance flooding areas, and identifies feasible locations for green infrastructure retrofits. A model was developed to establish a baseline condition and further GIS and field investigations are performed to narrow the list of retrofit possibilities to a shorter list of high-potential sites. Ultimately, this information was loaded into a SUSTAIN model that used a cost-optimization routine to identify the lowest cost series of green infrastructure retrofits necessary to meet the water quality and flood control objectives required. Once the optimization results were complete, the candidate projects were prioritized and conceptual designs and cost estimates were developed for the highest priority sites and incorporated into public outreach programs and training seminars.
Pilot Green Infrastructure Project Prioritization System, City of San Diego, CA. Project Manager to develop a pilot-scale green infrastructure project prioritization system to allow the City’s to make data-driven project decisions in an easily accessible and understandable platform. The system includes three key elements: (1) Using LiDAR data and advanced image processing algorithms, GIS layers of green infrastructure opportunities and their associated tributary drainage areas were developed with greater than 95% accuracy; (2) High-resolution data were linked to the City’s watershed modeling systems, and a series of “rules” were developed to prioritize each individual candidate project by its effectiveness and efficiency relative to other projects; (3) A web-based platform was developed to allow users to easily access and explore the data, enabling users to examine different prioritization scenarios across programs, such as LID on public land, green streets, and regional projects. The project prioritization system gives the City the ability to generate an “optimized” CIP that includes cross-program synergy and quantifies the potential cost savings that might result from coordination between programs.
Green Infrastructure Master Plan, Scott Air Force Base (2014). Project Manager for developing a unique modeling approach for demonstrating the effectiveness of green infrastructure for meeting both water quality and quantity objectives – simultaneously -89-
Résumé Chad S. Helmle, PE
3 achieving compliance for development projects while also resolving nuisance flooding in affected areas. The project approach involves a comprehensive field survey and model analysis to investigate individual flooding areas and reconnaissance-level surveys to identify candidate locations for LID and green infrastructure in the flooding drainage area. A SUSTAIN model is used to evaluate green infrastructure scenarios to identify the lowest cost solution that achieves the flood mitigation and development-related stormwater management objectives. Ultimately, the results of the green infrastructure optimization analysis are incorporated into a green infrastructure planning and sizing tool and conceptual BMP plans are integrated into the final Green Infrastructure Master Plan. This is a first-of-its kind multi-objective approach to be used at an AFB and is expected to pave the way for similar cost-saving efforts at other installations where nuisance flooding is present.
Integrated Stormwater Capture Strategy Pilot, City of San Diego, CA. Project Manager to quantify at the planning-level the potential water supply benefits and challenges of capturing treated effluent from green infrastructure to offset potable water supply. Given the billions of dollars of investment needed to capture stormwater to meet water quality goals in the San Diego area, this analysis evaluates the possible cross-connection between the yet-to-be-constructed stormwater capture infrastructure and the existing (and soon-to-be- upgraded) water reclamation infrastructure. Innovative new approaches are being evaluated to determine whether or not such a cross connection is feasible and cost-effective. Several metrics are being developed to support this analysis, such as unit water supply augmentation costs and quantification of water resiliency and risk. The results of this study will set the stage for a potentially unprecedented distributed stormwater capture and water supply augmentation system.
Safe, Clean Water Program Credit Trading Framework Development, Los Angeles County Flood Control District, 5/2019-Present.
Principal-in-charge of providing strategic planning and program management consulting in support of developing a credit trading program that includes direct linkage to municipal stormwater Permit compliance, and that also advances the parallel goals of the Safe, Clean water Program—namely, water supply augmentation, nature-based solutions, and community investments. Establishing a framework for a strategic, market-based stormwater management program that (1) clearly satisfies Permit requirements, (2) meaningfully prioritizes multiple benefits, and (3) allows for and encourages third-party participation/investment. Specific deliverables that were developed in close collaboration with the County and The Nature Conservancy included draft ordinance language, a public- facing framework document, a workplan for further advancement of the stormwater market programs, and preparation of content and facilitation of outreach meetings with key stakeholders, including the business community and environmental advocates.
Multi-Benefit Stormwater Capture Projects for the Upper San Gabriel River Watershed Program, City of Industry, 5/2019-Present.
Principal-in-charge providing strategic planning oversight.
Lower San Gabriel River Watershed Project Studies, John Hunter and Associates, 5/2019-Present. Principal-in-charge providing strategic planning oversight.
Storm Water Harvesting and Use Study, City of San Diego, 4/2019-Present. Principal-in-charge of coordinating with City Transportation and Storm Water Department and Public Utilities Department to develop a draft framework for City-wide stormwater capture planning, which will be fully built-out by our team during the following fiscal year. Also outlined presentation content to be delivered to communicate findings to the City Council Environmental Committee.
Strategic Project Pilot Study for Compton Creek Watershed, Los Angeles County Department of Public Works, 7/2018-5/2019.
Principal-in-charge of inventing, implementing, and validating a strategic method for stormwater capture project planning for the 2,680 square miles of watershed that is managed by Los Angeles County Flood Control District. High-resolution data and on-the-ground engineering provided the foundation for project identification and screening, then analytical tools were used to characterize potential performance using meaningful metrics (e.g., average annual volume captured, annual pollutant load captured). The approach was pilot tested in a representative area of the County before expanding Countywide. Upon completion, the pilot study provides a framework for data-driven project selection and a standard “currency” to credit the County for building projects downstream from their Unincorporated areas, and also to trade credit with upstream cities when the County builds downstream projects.
Adaptive Management and Annual Reporting, Upper Los Angeles River and Dominguez Channel Watershed Management Groups, 5/2018-12/2018. Principal-in-charge of developing of MS4 Permit-required annual reporting for the Los Angeles River (the largest watershed in Los Angeles County) and Dominguez Channel (the most impervious watershed in Los Angeles County). Included generation of graphic-heavy documents that “tell a story” about the watersheds instead of simply reporting the facts. Also included adaptive management analysis to identify methods for streamlining watershed management programs and reducing overall costs to permittees. Adaptive management recommendations provided permittees with meaningful information to negotiate permit terms with regulators.
Dominguez Channel Watershed Management Group Report of Waste Discharge (ROWD), South Bay Cities Council of Governments, CA. Principal-in-charge for the development of the ROWD for the Dominguez Channel Watershed Management Group (DC WMG), which pioneered innovative regulatory reporting in the Los Angeles Region. The DC WMG requested an overhaul to the traditional MS4 documentation method in order to reflect the challenging conditions within the watershed, as well as the unique compliance approaches that are being implemented. Led development of a comprehensive “watershed story” that showcased the progressive vantage point of the DC WMG, while also serving as the requisite MS4 Permit reapplication and initial iteration of the adaptive management process.
-90-
Oliver D. Galang, PE, ENV SP, QSD/P, QISP
Principal Engineer
Résumé 1
Experience Summary
Oliver Galang has more than 30 years of professional engineering experience in planning, design, construction, and program management of multi-million-dollar municipal capital improvement projects, specifically in water resources and stormwater infrastructure throughout southern California. He has extensive experience in the areas of water resources, stormwater and urban runoff management, water quality monitoring programs, flood management, and various types of green infrastructure. He is currently leading Craftwater Engineering’s Water Resources services in the Los Angeles County area.
Highlights of Oliver’s career also include service as the Head of the Los Angeles River Watershed for the Los Angeles County Department of Public Works. His responsibilities included staff management and direction for the planning of multi-use, multi-benefit projects, with an estimated construction value of more than $60 million, along the Los Angeles River. He served as the Head of the Data Management Section for Los Angeles County Department of Public Works and was responsible for an annual budget of more than $10 million in urban runoff and stormwater quality monitoring programs, including Los Angeles County Flood Control District (LACFCD’s) National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Monitoring Program. He was also responsible for managing the operations of the LACFCD flood control and water conservation system, which consisted of 14 reservoirs, 500 miles of conveyance channels, and 27 groundwater recharge facilities.
Relevant Experience
Arroyo Seco – San Rafael Wetlands and Restoration Stormwater Capture Project Principal Engineer. This project consists of the development of a Feasibility Study and 10% Design a regional stormwater capture project that incorporates creek restoration, natural treatment wetlands, and stormwater use for irrigation. The project consists of 2 locations along the Arroyo Seco Channel in the Cities of Pasadena and South Pasadena. The project is intended to address the Cities of Pasadena’s and South Pasadena’s water quality actions required under the Upper Los Angeles River Enhanced Watershed Management Program. He was responsible for managing the development of the feasibility study, meeting with the Cities, stakeholders, and assisting the City with securing $5 Million in funding from the Safe, Clean Water Program.
Bellflower Water Capture Project at Caruthers Park, Phase I and II Project Manager. This project consists of the design and construction of a regional stormwater BMP Project at the City of Bellflower’s Caruthers Park. The project consists of a storm drain diversion structure, 7.5-acre-foot underground infiltration and storage facility, and pump station to the sewer and return flow to the storm drain. The project is intended to address the City of Bellflower’s water quality actions stated under the Los Cerritos Channel Watershed and the Upper San Gabriel River Enhanced Watershed Management Programs. Oliver is leading the project development team and coordinating these efforts with the City Project Team and the LACFCD.
Carson Water Capture Project at Carriage Crest Park, Phase I and II, Sanitation Districts of Los Angeles County
Project Manager. This project consists of the design and construction of a regional stormwater BMP Project at the City of Carson Carriage Crest Park. The project consists of a storm drain diversion structure, 13.4 acre-foot underground storage facility, and pump station to the sewer and return flow to the storm drain. The project is intended to address the City of Carson’s water quality actions stated under the Dominguez Channel Watershed Management Area Group’s Enhanced Watershed Management Program. Oliver is leading the project development team and coordinating these efforts with the County Sanitation Districts, LACFCD, and the City Project Team.
EDUCATION
B.S., Civil Engineering, California
State University, Fullerton, 1993
Engineering Management
Graduate Studies, California
State Polytechnic University,
Pomona, 2005
AREA OF EXPERTISE
Water Resources, Storm water
Compliance, Water Quality
Monitoring Programs, BMP
Design, Drainage Design, Flood
Control, and Groundwater
Recharge
MS Project, Primavera
Scheduling
REGISTRATIONS/
AFFILIATIONS
Civil Engineer 56558, California,
1997
TRAINING/CERTIFICATIONS
Envision Sustainability
Professional, November 2014
Qualified SWPPP Developer
(QSD/P)
Qualified Industrial Storm Water
Practitioner (QiSP)
YEARS OF EXPERIENCE
30 years
CONTACT
Email:
[email protected]
Tel. 213.598.4178
-91-
craftflflwater"
engineering. inc.
craft’fiwater"
engineering, inc.
Résumé Oliver D. Galang, PE ENV SP
2 Bolivar Park Water Capture Project, City of Lakewood Public Works Department, Lakewood, California Project Manager. Phase I of this project consists of the development of two project concepts that will divert wet-weather and dry- weather urban runoff from the Los Cerritos Channel to an underground infiltration gallery or storage system at two City Parks, resulting in the development of 10% design documents for two City Park Regional BMPs. Phase II consisted of the development of the final design documents for an innovative regional BMP at Bolivar Park. Phase III includes the design support services during construction of the regional BMP. Oliver is leading the project development team and coordinating these efforts with the City Project Team and leading the coordination with the LACFCD.
Mayfair Park Water Capture Project, City of Lakewood Public Works Department, Lakewood, California Project Manager. This project consists of the development of a regional BMP that will divert wet-weather and dry-weather urban runoff from the Los Cerritos Channel to an underground infiltration gallery or storage system at Mayfair Park. The project consists of the development of final design documents for an innovative regional BMP at Mayfair Park that includes stormwater capture and use for irrigation. The diversion structure consists of an air-inflated rubber dam and inlet structure. The discharge options include sanitary sewer discharge or filtration and discharge into the storm drain system. Oliver is leading the project development team and coordinating these efforts with the City Project Team and leading the coordination with the LACFCD.
AB 530 Lower Los Angeles River Revitalization Plan, Vernon to Long Beach, Los Angeles County Department of Public Works, California Project Manager. This project consists of the development of a visionary, community-based revitalization plan for the 19-miles of the Los Angeles River, from Vernon to Long Beach. The project is being developed in response to Assembly Bill 430, which requires the development of the Lower Los Angeles River Working Group and the development of a revitalization plan that addresses the unique and diverse needs of the Lower Los Angeles River. Oliver, on behalf of the LACFCD, Rivers and Mountains Conservancy, and Assemblyspeaker Rendon, is managing the direction of the technical documentation for the Working Group, the technical teams in assessing the multiple facets of the revitalization plan, which includes a robust Community Engagement Program, assessment of the Community Economics, Public Recreation needs, sustainable water resources, and environmental enhancement opportunities.
Echo Park Lake Rehabilitation Project, City of Los Angeles, Bureau of Engineering, Los Angeles, California Project Manager. He managed the construction phase of this $50 million project, including reviewing contractor submittals, responding to requests for information, and preparing weekly reports. This rehabilitation project was funded by the City’s Proposition O Clean Water Bond. Project goals were to characterize the sediments of the existing lakebed, quantify contaminated soils, design in-lake improvements for a constructed wetland, design surrounding parkland BMPs, and provide vegetation, habitat, and parkland improvements.
Lake Hodges Reservoir Water Quality Assessment Study, City of San Diego, California Project Manager. This project consists of an evaluation of the Lake Management issues in the reservoir and the development a conceptual design report with those recommendations. This study evaluated water quality challenges in the reservoir, including algae, regulatory demands, and quagga mussel controls in the reservoir. Scope of work also includes the development of a hydrodynamic model to estimate the potential changes to the reservoir as a result of the proposed alternatives including algae harvesting wetlands and a speece cone. He was responsible for managing the project, coordination with the stakeholders, conducting the conceptual alternatives workshop, and the development of the conceptual planning report documents.
State Route 73 Conversion from Pilot to Approved BMPs, Caltrans District 12 Technical Lead. Oliver evaluated pilot best management practices (BMPs) and developed improved skimmer designs for four pilot BMPs with skimmer outlets. This project provided a conversion plan of 22 pilot BMPs to permanent BMPs located along State Route 73 for the California Department of Transportation, and the re-design, construction, and installation of improved skimmers.
He developed three concepts for improving the pilot BMP basins with skimmer outlets. These concepts consisted of improvements to the intake system, and operation and maintenance procedures.
Agua Hedionda and Calaveras Creek Channels Dredging Project, City of Carlsbad, California Project Manager and Technical Lead. This project consists of the preparation of design plans and specifications for sloping rip rap drop structures and excavation to improve the flood control capacity of the channels. He is responsible for project management and for the development of the design documents for the City.
North Tecolote Canyon Creek Crossing, City of San Diego Public Utilities, California Technical Lead. This project involves the development of stream crossings along the Tecolote Canyon. The stream crossings will support the City’s Public Utilities to access and maintain the sewer pipeline system within the canyon areas of San Diego.
Regional Stormwater Facility Feasibility Study, City of San Jose, California Technical Lead. The Regional Stormwater Facility Feasibility Study project consist of the evaluation of the City’s requirements under the San Francisco Bay Municipal Regional Stormwater NPDES Permit for meeting Low Impact Development and Hydromodification requirements for developments and redevelopments. He was responsible for conducted the review of the permit requirements, evaluating similar programs and projects to address these requirements, and develop an approach for alternative compliance methods.
-92-
Merrill Taylor, PE
Principal Project Manager
Résumé 1
Experience Summary
Mr. Merrill Taylor is a water resource design engineer providing support to federal, state, and municipal clients in the areas of hydrologic, hydraulic and water quality studies, storm drain and regional retention/infiltration facilities design, and plan, specifications, and estimate development, currently focusing on feasibility and design projects in Southern California. Specifically, he serves as project manager and technical lead for the research, design, and implementation of storm water management practices intended to mitigate flooding and improve water quality, including multiple projects in the Los Angeles and San Diego Region. Project experience includes full hydrology and hydraulics analyses of existing and proposed storm drain networks, design of regional retention/detention facilities including evaluation of the inflow diversions, storage capacities, and outflow/infiltration possibilities, and development of construction ready plans, specifications, and estimates for storm drain replacement and proposed regional facilities. He also provides engineering support to municipal clients to ensure practicality during the development of watershed management plans and hydromodification management plans to support BMP/LID implementation. He has practical experience in many facets of water resource engineering, with an in-depth understanding of the relationship between hydrology/hydraulics, water quality, watershed management, and regulations.
Relevant Experience
Santa Monica MS4 Compliance & Trash Reduction Project. City of Santa Monica. Project manager leading the evaluation of two potential stormwater treatment projects (Pico-Kenter Outfall Trash Capture and Memorial Park Stormwater Capture) and a Green Street Master Plan to help the City of Santa Monica gain a greater understanding of their progress towards MS4 Compliance. The project researched various trash capture strategies at the outfall, modeled hydraulic impacts, and estimated costs. Developed 10% level conceptual designs to support future grant application opportunities.
Greer Park Drainage Improvement Project Feasibility Study. City of Huntington Beach.
Project manager leading the evaluation of potential stormwater improvements to mitigate localized flooding occurring around Greer Park. During storm events, the grass area around the pond and the streets surrounding the park become inundated with flow completely covering lanes of traffic and creating a safety hazard. The existing pond acts as a system sump with an outlet that does not have sufficient pressure to push water into the main storm drain during rain events necessitating a mobile pump to reduce flooding within the neighborhood. The project was identified within the Huntington Beach Master Plan of Drainage and we are modeling the existing condition and potential solutions within the PCSWMM platform. Results will be summarized within a concept design that the City can use to position for a FEMA BRIC grant.
Fern Dell Restoration & Stormwater Capture Project Feasibility Study. Friends of Griffith Park. Preparing a Feasibility Study for a regional stormwater capture project for submission to the Safe, Clean Water Program for funding. The project included working directly with the non-profit group, Friends of Griffith Park. A stormwater diversion from an existing City storm drain to a 3 acre-feet storage system beneath an existing park area is proposed. Water collected in the subsurface storage system will be pumped up the site to help feed an existing creek that travels down through the site and supports a diverse ecosystem of plants and animals. Built up debris and sediment will be removed form portions of the creek to allow for the water to flow freely and native plants will replace non-native ones with a focus on water-efficient drought tolerant plants.
EDUCATION
M.S., Civil and Environmental
Engineering (Water Resources),
Brigham Young University, 2010
B.S., Civil and Environmental
Engineering, Brigham Young
University, 2008
AREA OF EXPERTISE
Feasibility Studies
Safe, Clean Water Program
Watershed hydrology and
stormwater
Watershed runoff quality
Water quality modeling
Watershed management plan
development
BMP modeling, evaluation, and
design
Tool development
REGISTRATIONS/
AFFILIATIONS
Professional Engineer, California
No. 81590, 2013
TRAINING/CERTIFICATIONS
Project Management Training
YEARS OF EXPERIENCE
14 years
CONTACT
Email:
[email protected]
-93-
craftflflwater"
engineering. inc.
II
I
I
craft’fiwater"
engineering, inc.
Résumé Merrill Taylor, PE
3 Arroyo Seco-San Rafael Treatment Wetlands Project Feasibility Study – Pasadena and South Pasadena, CA (2020) Prepared Feasibility Study for two regional stormwater capture practices (San Rafael and San Pascual) located within open space near the Arroyo Seco Channel.
The Feasibility Studies were prepared for submission to the Safe, Clean Water Program for funding. An infiltration basin is proposed to intercept wet weather flows from the San Rafael Creek and dry weather flows will be directed to a natural stream constructed above the San Rafael Creek concrete channel. The San Pascual site will treat wet and dry weather flows diverted from the Arroyo Seco Channel using a treatment wetlands. Native, natural landscaping will improve aesthetics of the spaces and provide habitat for wildlife and recreational use.
Monument Mesa/Friendship Park Border Field State Park Stormwater Capture Project. City of Imperial Beach. Provided technical engineering support in the evaluation of retrofitting the Monument Mesa/Friendship Park Border Field State Park with stormwater capture practices to reduce site flooding and decrease sediment runoff to improve site stability and lower required water use on-site. Performed on-site evaluations, identified the possible stormwater capture low impact development practices, and generated a preliminary conceptual design layout in coordination with the landscape architect. The conceptual layout incorporated feedback from the local community and project stakeholders to ensure each of their objectives were met. The project required coordination and collaboration between the California Department of Parks, the City of Imperial Beach, the University of San Diego Department of Urban Studies & Planning, the US Customs and Border Protection, and South Bay Community Services. Directed and presented at stakeholder meetings to build towards consensus for project elements and learn of the site history and concerns. Presented to the community groups through site tours in both English and Spanish.
Santa Monica Clean Beaches Project, Santa Monica, CA. City of Santa Monica. Providing engineering design support in water quality, hydrology, and hydraulic modeling to develop the full design of two subsurface runoff storage tanks that eventually divert flows to the Santa Monica Urban Runoff Recycling Facility for treatment and use. Evaluating multiple BMP configurations, diversions, footprints, and real time inlet and outlet controls to optimize capture volumes while minimizing costs. The project will assist the City of Santa Monica with complying with the bacteria reduction requirements for dry-weather flows.
Caruthers Park Stormwater and Urban Runoff Capture Project. Bellflower, CA. City of Bellflower. Providing modeling technical lead assistance in water quality, hydrology, and hydraulic modeling to develop the full design at Caruthers Park for the City of Bellflower to assist in compliance with the Los Cerritos Channel and Lower San Gabriel River Watershed Management Program requirements.
Evaluating diversion from two possible channels/pipes, BMP footprints, and real time inlet and outlet controls to optimize the compliance with water quality targets while minimizing costs. Evaluating the irrigation requirements and potable water offset for the park and nearby City owned parcels through the use of dry and wet-weather flows.
Lakewood Stormwater and Runoff Capture Project. Lakewood, CA. City of Lakewood. Providing modeling technical lead assistance in water quality, hydrology, and hydraulic modeling to develop two full designs at Bolivar Park and Mayfair Park for the City of Lakewood to assist in compliance with the Los Cerritos Channel Watershed Management Program requirements. Evaluating multiple BMP diversions, footprints, and real time inlet and outlet controls to optimize the compliance with the water quality targets while minimizing costs. Evaluating the irrigation requirements and potable water offset through use of dry and wet-weather flows. Supporting the development of the 100% design plans for implementation.
Albion Riverside Park, City of Los Angeles. Provided engineering support in the full design of a regional BMP project to reduce pollutant loads and runoff volume for a 300-acre mixed residential and commercial watershed. Work included modeling the impacts of different diversion rates on the overall water quality and associated pollutant reduction. The design involved multiple BMPs and BMP types, including bioretention, permeable pavement, and subterranean infiltration basins. Full design plans will include details for multiple BMP configurations to serve as an example project to investigate the impacts of various components of BMPs implemented in a regional setting. A full geotechnical investigation, architectural renderings, and full construction cost estimates were included in the project.
Aliso Creek-Limekiln Creek Restoration Project, City of Los Angeles. Provided engineering and modeling support to develop a full design for stream retrofit at the confluence of Aliso Creek and Limekiln Creek. The project includes construction of several BMPs intended to divert, capture, filter, and use on-site in order to reduce contamination in the Los Angeles River Watershed. The proposed BMPs include low flow channel diversions, pre-screening treatment devices, stormwater pump stations, bioswales, vegetated detention/retention basins, the restoration of upland and riparian habitats, and educational components.
Alondra Park Multi-Benefit Stormwater Capture Project, County of Los Angeles. Providing project management and modeling lead support to develop a 30% design and preliminary engineering concept report for Alondra Park Multi-Benefit Stormwater Capture Project for the County of Los Angeles. Leading the team that is evaluating diversion from two possible pipes, various BMP footprints, and differing outflow treatments. Overseeing the evaluation of the irrigation requirements and potable water offset for the park. Observed the geotechnical investigations on-site and the preparation of the geotechnical reports. -94-
Résumé Merrill Taylor, PE
4 Adventure Park Multi-Benefit Stormwater Capture Project, County of Los Angeles. Providing project management and modeling lead support to develop a 30% design and preliminary engineering concept report for Adventure Park Multi-Benefit Stormwater Capture Project for the County of Los Angeles. Leading the team that is evaluating diversion from two possible pipes, various BMP footprints, and differing outflow treatments. Overseeing the evaluation of the irrigation requirements and potable water offset for the park.
Performing on-site water quality monitoring to establish the baseline condition including obtaining of all necessary access and construction permits.
Santa Fe Drive Corridor Bike & Pedestrian Improvements, City of Encinitas. Provided technical expertise and engineering support in the 100% design of a green street enhancement project to introduce a protected bicycle lane and incorporate bioretention and permeable pavements to reduce localized runoff. The design involved modeling and calculating the existing and the proposed runoff conditions and sizing the BMPs to ensure permit compliance. Our team led the development of the civil design sheets for the stormwater elements, prepared all specifications related to stormwater, and generated an engineer’s estimate. The project is currently under construction.
Alamo, Salvation, and 68th Street Basins Low Impact Development Retrofit, City of San Diego. Providing engineering support in the 100% design of a green street enhancement project to reduce pollutant loads and runoff volume for a 10-acre commercial watershed.
The design involves multiple BMPs and BMP types, including permeable pavement and suspended pavements. Design plans included details for multiple BMP configurations, designed as retrofits, to serve as a pilot project to investigate the impacts of various components of BMPs implemented in the right-of-way. A full geotechnical investigation, architectural renderings, and construction cost estimates are included in the project.
Bannock Avenue Green Street Design, City of San Diego. Providing engineering support in the full design of a green street enhancement project to reduce pollutant loads and runoff volume for a 65-acre mixed residential and commercial watershed. The design involved multiple BMPs and BMP types, including bioretention and permeable pavement. Full design plans included details for multiple BMP configurations, designed as retrofits, to serve as a pilot project to investigate the impacts of various components of BMPs implemented in the right-of-way. A full geotechnical investigation, architectural renderings, and full construction cost estimates were included in the project.
Elmer Avenue Paseo Retrofit, City of Los Angeles. Provided engineering and modeling support to develop project retrofits to the existing BMP configuration and design of BMP implementation along the Elmer’s Paseo in Los Angeles, CA. The recently completed Elmer Avenue BMP retrofit project is experiencing high sediment loads creating fouling within the newly constructed infiltration galleries and bioretention areas. The Phase II efforts require additional retrofit design to prevent fouling and allow for the BMPs to function properly.
A SWMM model illustrated the current conditions and potential future designs with their expected impact. The Paseo design requires the consideration of the upstream adjustments while providing for a removal goal of 4 acre feet per year. The design configuration is optimized using the SUSTAIN model and illustrates potential construction solutions.
Eagle Rock Boulevard: A Multi-Modal Stormwater Capture Project. Prepared SUSTAIN modeling and conceptual capture strategies for a regional stormwater capture project for consideration by the City of Los Angeles for submission to the Safe, Clean Water Program for funding.
The project included working directly with StreetsLA to coordinate the current 710 North Mobility Improvement efforts with the desired stormwater improvements. The project consists of a stormwater diversion from an existing City storm drain to a 5 acre-feet storage system beneath the proposed improved median and a second diversion on Alumni Avenue to a series of dry-wells beneath a proposed pedestrian plaza. Water collected in the subsurface storage system will be infiltrated (if geotechnical investigations show favorable rates) while the surface runoff will be captured in bioretention cells and pervious pavement systems along the parking lanes.
Orpheus Avenue Drainage Improvements, City of Encinitas. Providing project management, public outreach, and engineering support in the 100% design of a green street enhancement project to reduce nuisance flooding and runoff volumes for a 153-acre residential watershed. The design involves multiple green infrastructure practices, including permeable pavement and bioretention. Design plans included details for multiple BMP configurations, designed as retrofits, to serve as a green solution to reduce flooding and mitigate peak flows thus limiting the need for traditional grey infrastructure solutions within the right-of-way. A full geotechnical investigation, architectural renderings, and construction cost estimates are included in the project.
Comparison of Gray versus Green Infrastructure Solutions. Encinitas, CA. City of Encinitas. Technical modeling lead to apply SUSTAIN to evaluate potential green infrastructure solutions to manage flooding at a prominent intersection in the City. Worked with modeling team to identify all BMP opportunities and develop a continuous simulation model to evaluate the hydrology and water quality improvement from multiple BMPs, including bioretention areas and permeable pavement. Compared hydrologic performance and cost of the green infrastructure solutions to proposed gray infrastructure retrofits. -95-
Courtney Semlow, P.E., ENV SP, CFM
Civil Design Manager
Résumé 1
Experience Summary
Courtney Semlow is a Project Manager with 18 years of professional experience. She has provided comprehensive site design and project management for diverse projects, including 1,000-acre mixed use subdivisions and military installation infrastructure throughout the United States and abroad. Courtney is knowledgeable in all aspects of civil design, including erosion control, water resource management, and road design. She is capable of navigating complicated regulatory requirements, while producing cost-effective solutions that exceed client expectations. Another core area of her work focuses on water quality and stormwater pollution prevention by implementing environmentally sustainable stormwater management solutions, including infiltration basins, permeable pavement, and rain gardens.
Relevant Experience
Wilmington Middle School Greening Project – Los Angeles, CA (2023) Providing project management of the civil design for the replacement of over 14,000 square feet of existing underutilized asphalt pavement areas with green program spaces and outdoor classrooms. We completed a hydrologic analysis to determine stormwater runoff amounts and provided a stormwater treatment and drainage design to improve water quality and ensure proper outflow of stormwater.
San Jose Creek Bike Trail Hydrologic and Hydraulic Analysis– Placentia, CA (2023) Provided oversight of hydrologic and hydraulic analysis for a proposed bike trail in Pomona, CA along the San Jose Creek concrete channel. We analyzed the existing areas draining towards the channel and recommended stormwater treatment BMPs that could be implemented along the project route. We also provided a hydrologic analysis of the adjacent park to determine if a more regional BMP could be implemented at the park.
Arroyo Seco Water Reuse and Stream Restoration Project– Pasadena, CA (2022-2023) Providing project management of the design of two regional BMPs along the Arroyo Seco channel in Pasadena and South Pasadena. Tasks included performing hydrologic and hydraulic analysis of channel diversions to above ground infiltration BMPs. Dry weather flows will travel through a rock lined stream to an existing cobble stone channel connected downstream to a golf course where it will be stored, treated, and used for irrigating the golf course.
Atwood Bike Trail Hydrologic and Hydraulic Analysis– Placentia, CA (2022) Provided oversight of hydrologic and hydraulic analysis for a proposed bike trail in Placentia, CA. The proposed bike trail is located adjacent to the existing Atwood concrete channel and will replace the access road. We analyzed the existing areas draining towards the channel and recommended stormwater treatment BMPs that could be implemented along the project route.
Red Morton Community Park Stormwater Capture Project Design– Redwood City, CA (2021-2023) Providing project management for the City of Redwood City to design a multi-beneficial regional stormwater capture practice at Red Morton Community Park. The project is anticipated to divert stormwater from an existing box culvert to a 43-acre-foot underground storage system set underneath existing soccer fields. The synthetic turf of the soccer fields are typically replaced every 7-10 years and the timing of this project is set to correlate with that effort. The City and Craftwater have committed to providing a design that meets community desires and stormwater treatment requirements for this 1,650-acre drainage area.
Encanto Park Stormwater Capture Project Design– Duarte, CA (2021-2023) Providing project management to design a multi-beneficial regional stormwater capture practice at Encanto Park in Duarte,CA. The project is anticipated to divert stormwater from an existing 72” storm drain to a 0.6-acre-foot underground infiltration storage system set underneath an existing soccer field. Excess stormwater that is unable to infiltrate will overflow and be treated by an additional filtration system before returning to the storm drain. Expanded landscaping areas within the parking lot will utilize drought tolerant, native plantings that will enhance the look of the parking lot and reduce potable water used for irrigation.
EDUCATION
B.S., General Engineering,
University of Illinois Urbana-
Champaign, 2005.
AREA OF EXPERTISE
Civil Site Design
Hydraulics and Hydrology
REGISTRATIONS/
AFFILIATIONS
Professional Engineer (Civil),
CA C94417, MA, VA.
Envision Sustainability
Professional (ENV SP)
Certified Floodplain Manager
(CFM)
Member, The Association of
State Floodplain Management
YEARS OF EXPERIENCE
18 years
CONTACT
Email:
[email protected]
LinkedIn:
linkedin.com/in/courtneysemlow
-96-
craftflflwater"
engineering. inc.
II
II
I
craftflwater‘
engineering, inc.
Résumé Courtney Semlow, P.E., ENV SP, CFM
2 Skylinks Golf Course Stormwater Capture Project Design– Long Beach, CA (2021) Providing project management to design a multi-beneficial regional stormwater capture practice at Skylinks Golf Course in Long Beach,CA.
The project is anticipated to divert stormwater from the existing Wardlow Channel to a 9.7-acre-foot underground infiltration storage system set adjacent to an existing golf course. Dry and wet weather flows will flow through the underground storage and be pumped to a surface wetland basin that is placed above the subsurface storage system. Excess stormwater will overflow and be treated by an additional filtration system before returning to the storm drain. Walking paths around the wetland cells, a sand volleyball court for the adjacent Fire Station, and a nursery for the Golf Course are additional project amenities that have been identified while working with project stakeholders.
El Dorado Park Regional Stormwater Capture Project Design– Long Beach, CA (2021) Providing project management to design a multi-beneficial regional stormwater capture practice at El Dorado Park in Long Beach,CA. The project is anticipated to divert stormwater from the existing Artesia Norwalk Channel to a 13.9-acre-foot underground wetland system set in a currently underutilized area within El Dorado Regional Park. The storm diversion will utilize existing storm drain pipes and ditches to convey diverted runoff to the proposed wetland area which is approximately 1.5 miles away from the channel. Dry and wet weather flows will be treated by a proprietary pretreatment device before flowing through the wetland basin that is comprised of multiple cells and planted with native vegetation selected in collaboration with the El Dorado Park staff. Excess flows will go to an existing drainage ditch before outletting downstream at Coyote Creek. The project is also considering discharging some outflow to the sanitary sewer as the Long Beach Water Reclamation path is just south of the site.
Arboretum Natural Treatment Project Feasibility Study– Arcadia, CA (2020) Designed 10% conceptual drawings and prepared Feasibility Study for a regional stormwater capture project submission to the Safe, Clean Water Program for funding. The project includes a stormwater drop-inlet diversion from the LACFCD Arcadia Wash Channel and a 4 acre-feet treatment wetland/recharge basin. Diverse natural landscaping will complement the overall aesthetic of the Arboretum and enhance the use of the space.
Heartwell Park at Clark Stormwater Capture Project Feasibility Study – Long Beach, CA (2021) Managed design of 10% conceptual drawings and Feasibility Study for a regional stormwater capture practice adjacent to the Clark Channel for submission to the Safe, Clean Water Program. A Pre-treatment unit will remove pollutants from runoff diverted from the Palo Verde Chanel runoff before the water is temporarily stored in a 20 ac-ft subsurface storage system. Treated outflow from the underground storage will travel through a small existing lake where it will offset the need for potable water to sustain the lake’s water level. Wetland cells will enhance the aesthetics of the lake and a naturalized stream will connect the lake overflow back to the existing channel.
Apollo Park Stormwater Capture Project Feasibility Study– Downey, CA (2021) Managed design of 10% conceptual drawings and Feasibility Study for a regional stormwater capture project submission to the Safe, Clean Water Program for funding. The project includes a stormwater diversion from an existing LACFCD storm drain to a 10 acre-feet infiltration system beneath an existing baseball surface. New catch basins and storm drain are proposed at nearby intersections and will connect to the system and help alleviate local flooding. Reductions of impervious area, a green street, permeable pavement, and diverse natural landscaping provide onsite stormwater management and improve the aesthetics of the park.
Griffith Park Stormwater Capture Project Technical Research Proposal – Los Angeles, CA (2021) Prepared Technical Research Proposal for a regional stormwater capture project for submission to the Safe, Clean Water Program for funding.
The project included working directly with the non-profit group, Friends of Griffith Park. A stormwater diversion from an existing City storm drain to a 3 acre-feet storage system beneath an existing park area is proposed. Water collected in the subsurface storage system will be pumped up the site to help feed an existing creek that travels down through the site and supports a diverse ecosystem of plants and animals. Built up debris and sediment will be removed form portions of the creek to allow for the water to flow freely and native plants will replace non-native ones with a focus on water-efficient drought tolerant plants.
Heartwell Park at Palo Verde Stormwater Capture Project Feasibility Study – Long Beach, CA (2020) Designed 10% conceptual drawings for a regional stormwater capture practice adjacent to the Palo Verde Channel for submission to the Safe, Clean Water Program. A Pre-treatment unit will remove pollutants from runoff diverted from the Palo Verde Chanel runoff before the water is temporarily stored in a 7.5 ac-ft subsurface storage system. Outflow from the underground storage will either go back to the existing channel or an existing sanitary sewer in Palo Verde Ave depending on the time of day and the flow rate. Additionally, a surface biofiltration basin will manage dry weather flows and provide a visual to the community of stormwater treatment practices.
City of Pasadena Storm Drain Master Plan and Watershed Assessment – Pasadena, CA (2021) The project attempts to provide a comprehensive inventory of storm drain asset locations/conditions and conduct a watershed assessment to produce an EWMP implementation strategy for the City. Coordinated assessment and inspection of existing storm drain infrastructure and -97-
Résumé Courtney Semlow, P.E., ENV SP, CFM
3 provided technical guidance on interpretations and upgrade recommendations. Utilized planimetric data generated from LIDAR and aerial photos to identify and assess parcels in the City that had regional stormwater project potential. Factors considered included parcel owner, tributary area, parcel size, upstream impervious percentage and proximity to an existing drain line.
Santa Fe Drive Bike and Pedestrian Improvements – Encinitas, CA (2021) Prepared conceptual stormwater plans for proposed green street improvements to Santa Fe Drive in Encinitas, CA. Available space for stormwater treatment is limited in the tight roadway corridor, therefore different treatment approaches are proposed such as pre-cast subsurface biolfiltration units located beneath pavement and surface biofiltration located within landscape islands where available.
Underdrains are required due to high groundwater but limited existing drain infrastructure to connect to requires careful selection of treatment cell locations to minimize additional infrastructure costs.
-98-
Sean has 24 years of experience specializing in water resource services with a background in stormwater, wastewater, urban and natural landscape, creek watershed studies, and groundwater. He is an expert in stormwater green infrastructure (GI), MS4 Permit compliance, NPDES permit program requirements, Areas of Special Biological Significance (ASBS) discharge requirements, total maximum daily loads (TMDLs) allocations and monitoring, and publicly funded research‑driven watershed studies. His experience includes consulting, training, monitoring and reporting for GI and trash capture projects for state, municipal, transportation, federal, and low impact development. Currently an Industrial General Permit (IGP) Trainer of Record (ToR), Qualified Industrial Stormwater Practitioner (QISP), he develops innovative solutions that enhance quality, maximize efficiency, improve safety, and increase responsiveness.
PROJECT EXPERIENCE
City of San Diego Stormwater Department | Green Infrastructure Group 1012; San Diego, CA Southern California Water Lead. Sean is overseeing the detailed design of the GI Group 1012 project to create green infrastructure and stormwater quality improvements to the Logan Heights Neighborhood of San Diego.
Improvements include the installation of three new linear modular wetland systems, storm drain inlets and pipelines, cleanouts, curbs and gutters, sidewalks, pavements, and work to restore improvement site areas to original conditions. GI Group 1012 is one of the first priority projects to be implemented by the City under the WIFIA stormwater program.
Unified Port District of San Diego | BMP Inspections and Maintenance; San Diego, CA Stormwater Program Manager. The District owns and operates nearly 200 individual stormwater treatment control Best Management Practices (BMPs) installed throughout the Port Tidelands. The project includes trash capture devices and other pollutant reducing BMPs including storm drain inlet filters from various manufacturers, pervious pavements, proprietary devices such as Continuous Deflection Systems (CDS) units or modular wetland systems, bio‑ retention facilities, and media filters installed at
OFFICE LOCATION
San Marcos, CA
EDUCATION
M.S., Hydrogeology and Ocean Floor
Fluid Geochemistry, Georgia State
University
B.S., Geology, Chemistry, Georgia
State University
YEARS EXPERIENCE
24 PROFESSIONAL REGISTRATION
ToR Industrial (IGP Trainer of Record
#093 and Compliance Group Leader)
QISP #093 Qualified Industrial
Stormwater Professional
CPSWQ #0751 Certified Professional
in Storm Water
Quality QSD/QSP #21876 Qualified
SWPPP Developer
PROFESSIONAL ASSOCIATIONS
Co‑Chair Water Committee, San
Diego Industrial Environmental
Association (IEA)
CASQA IGP Subcommittee
SWRCB Industrial General Permit
Reissuance Stakeholder
County of San Diego Technical
Advisory Committee, Stormwater
Capture and Reuse
City of San Diego Stormwater/
Wastewater Fee TAC Member
SEAN PORTER, CPSWQ, QSD/P, QISP, IGP ToR
TECHNICAL LEAD — STORMWATER GREEN INFRASTRUCTURE
DESIGN, O&M, WATER QUALITY, AND REGULATORY
‑99‑
various District locations. With a large variety of BMPs, the Port is required to maintain compliance with their
NPDES Stormwater Permit and ensure inspection and
maintenance tracking is both accurate and efficient.
Los Angeles County Public Works | Safe Clean Water, BMP O&M Training; Los Angeles, CA Water Lead. Providing Best Management Practice
(BMP) operation and maintenance O&M inspections,
maintenance training for Public Works staff, and to
creation of customized video content for deployment
under the County’s Workforce Development plan. LACPW
has also allocated a $1.1M contract capacity for to
develop project‑ specific post‑construction stormwater
training media to support LACPW O&M, water quality
monitoring, and BMP effectiveness monitoring of
constructed and planned multi‑benefit projects to
address runoff water quality. Numerous projects are part of the scope of work, including, the East Los Angeles
Sustainable Median Stormwater Capture Project, Ladera
Park Stormwater Capture Project, Gates Canyon Park
Regional BMP Project, Adventure Park Multi‑Benefit
Stormwater Capture Project, and up to six‑Green
Street Projects.
City of Santa Monica | Engineering and Street Services Division, BMP O&M Services; Santa Monica, CA Stormwater Program Manager. The City owns, operates,
and maintains a variety of structural stormwater BMPs.
The list of structural BMPs includes over 600 individual BMPs such as storm drain inlet filters from various
manufacturers, Low Impact Development (LID) BMPs
such as porous pavement and pavers, biofiltration or
bioretention BMPs, and vegetated swales. The City
owns over 580 structural controls such as connector
pipe screens (CPS), Automatic Retractable Screens
(ARS), and sub ‑grade structures (CDS units and
Contech Stormfilters) to capture and prevent trash from discharging to the beaches. These BMPs are installed
at various City locations including roadways, sidewalks, and parks. Sean provided management and oversight
including quarterly inspections and trash removal from
over 580 CPS devices within the City jurisdiction, semi‑ annual inspections of over 50 LID ‑type BMPs, and
operation and maintenance of two rainwater harvesting
systems at Los Amigos Park and Marine Park.
Caltrans | Caltrans Construction Storm Water Training (Contract 43A0314); Statewide, CA Principal Scientist. Sean delivered live, in‑person
stormwater trainings to Caltrans and developed online
stormwater training based on the content of training
Modules 1, 2, and 7, including additional learning
evaluation quiz material to promote information
retention by the student. Sean worked closely with
Caltrans and Aztec Productions to; develop each
Module storyboards; collect field video and photos
using drones and steady‑cams; develop figures and
animations; video of instructors delivering trainings; field footage of stormwater BMP implementation; examples
of installation of construction site BMPs; and other
applicable video footage.
Waste Management | IGP Compliance; San Diego, CA
Senior Project Manager. Responsible for managing a
design package installation of several structural BMPs
for this large, solid waste client. Based on the updated SWPPPs compliant with the 2014 IGP, the project involves development the design documents to a roughly 35 to
40% complete level, develop a bidders list with quantities, and deliver the package to the client for implementation efficiency. The BMPs are engineered to provide water
quality improvements to assist the client in Permit
compliance by reducing the pollutants in discharge
from the sites.
City of Poway | MS4 Compliance; Poway, CA
Senior Technical Advisor. The Poway Development
Services Department is required to perform annual
inflow/outflow sampling of five flood control basins
within the City’s business park that have been converted into permanent SUSMP treatment BMPs. The project
designed the sampling points using automated sampling
equipment which are triggered to begin sampling upon
initiation of flow which resulted in a cost savings for the City. The sampling was conducted during one rain event
per year to demonstrate the effectiveness of these basins at reducing pollutant loads.
‑100‑
With 17 years of water reuse project delivery experience that spans engineering, project management, and sales, Eric is responsible for laying the foundation for success in each of Epic’s projects. By maintaining a focus on the business case for water reuse, Eric thrives on connecting development projects with the best, value-driven water conservation solutions.
Enaqua
Project Manager
Oct 2008 - July 2014
Led company's delivery efforts for 40+ international water, wastewater, and water reuse installations. Other duties included instrumentation and controls engineering, developing sequences of operations and PLC controls for industrial equipment.
NSU
Vice President, Business Development
July 2011 - Feb 2021
Responsible for leading business development initiatives for onsite water treatment and reuse systems within the Western region. Tasked to lead Design/Build and Operations (DBO) project deliveries and client relations support for existing customer base to grow the Western DBO business while also assessing and developing Ownership (Water Purchase Agreement – WPA) opportunities.
William J. Worthen Foundation
Board of Directors
Aug 2017 - Sep 2019
Supported the strategic and organizational planning efforts for the foundation, a 5013c that provides a forum for design, policy, and practice professionals in the urban design and construction industries.
Cambrian Innovation
Senior Project Manager
Aug 2014 - Sep 2016
Accountable for the success of the company's portfolio of projects relating to the development, design, manufacturing, commissioning, and operation of wastewater systems in the western United States.
Projects were highly technical, focusing on the development of anaerobic digesters, membrane bioreactors (MBR), solids handling, dewatering systems, and reverse osmosis wastewater treatment systems.
ERIC HOUGH,P M P
P R O J E C T E X E C U T I V E
PROFESSIONAL EXPERIENCE
Professional Associations:
USBGC
ILFI Ambassador
AIA
American Water Works
Association
WateReuse Association
US Water Alliance
Water Environment
Federation
Profession:
Civil and Environmental
Engineer
Current Position:
Chief Commercial Officer, Epic
Cleantec
Years of Experience:
17 Qualifications:
PMP Certified (December
2016)
Delivered over $100MM in
successful projects
Trained New Product
Introduction (NPI) specialist
Microsoft Silicon Valley | Blackwater Project
Project Executive
Aug 2017 – Nov 2020
Led the successful delivery of a 20,000 gpd blackwater system for Microsoft's 644,000 square foot Mountain View campus. The project consisted of treatment process design, preparation of Water Reuse Engineering Report, controls integration, construction oversight, and system The project is targeting LEED Platinum, Net Zero Water per the Living Building Challenge, and Well Building Standard certification. The project has been designed to ensure that 100% of its non- potable demand will be offset by a recycled water system that reclaims, treats, and re-uses rainwater, stormwater, greywater, and blackwater for the project and building site. Through a variety of efficient technologies, landscape restoration, and the minimizing of wasteful independence between water and energy, the project has the potential to be Living Building Challenge Net Positive Water contributing back to the local depleted ecology.
Google Bay View
Project Executive
January 2020 – March 2020
Responsible for coordinating a complete scope, of work, trade and vendor selection and buy-out, creation of baseline schedule, and budget. Details about the project scope, budget, approach, and status are CONFIDENTIAL.
Lagunitas Brewing Company
Senior Project Manager
Aug 2014 – Sept 2016
Led overall project delivery of a 80,000 gpd onsite wastewater treatment and water reuse system or a local brewery. cope included process design, permitting coordination, construction oversight, commissioning and operation of an 80,000 gallon per day MBR system. Client chose to install an onsite treatment system to reduce water and sewer utility fees and to reduce overall water consumption. Water recycling system produced water for flushing of process lines, rinsing, brewery equipment cleaning and washdown. System generated electricity from methane gas, a byproduct of the treatment process, and recovered waste heat from power microturbines for preheating of brewery boiler systems.
Bear Republic Brewing Company
Senior Project Manager
Aug 2014 – April 2016
Led overall project delivery of a 40,000 gpd onsite wastewater treatment and water reuse system for a local brewery. Scope included process design, permitting coordination, construction oversight, commissioning and operation of an 40,000 gallon per day anaerboic digester system.
System generated electricity from methane gas, a byproduct of the treatment process, and recovered waste heat from power microturbines for preheating of brewery boiler systems.
S E L E C T E D P R O J E C T S
San Diego Advanced Water Purification Facility
Project Manager
Nov 2010 – May 2015
To address water security concerns for the city of San Diego, project team designed and constructed a 1 million gallon per day Advanced Water Purification Facility. Project was implemented to demonstrate the viability of Indirect Potable Reuse, which ultimately resulted in 'Pure Water San Diego, a much larger project that will meet up to 30% of San Diego's potable water demand. Turnkey Design-Build delivery included ultrafiltration, reverse osmosis, ultraviolet disinfection and advanced oxidation using hydrogen peroxide, followed by chlorine disinfection.
San Vicente Wastewater Treatment Plant Expansion
Project Manager
Oct 2011 – Dec 2013
Expansion of the existing San Vicente Wastewater Treatment Plant to increase the average dry weather flow capacity from 0.60 million gallons per day (mgd) to 0.80 mgd. Project included the following three major components: 1.) improvements and additions to the treatment process facilities at the reclamation plant site; 2.) construction of a new, 93 acre-foot storage pond and stream diversion channel on-site, west of the existing storage ponds; and, 3.) construction of a reclaimed water line from the new storage pond and under San Vicente Road to the San Vicente Golf Course, located approximately 1.5 miles to the east of the site.
Kohanaiki Resort
Project Manager
Oct 2011 – Dec 2013
Turnkey delivery of an advanced membrane treatment system, including pre-treatment and energy recovery. System sized to treat high TDS water in order to deliver water for salt-sensitive landscaping and golf course.
Hotel Marina Resort
Project Manager
Jan 2013 – June 2014
Turnkey delivery of an advanced membrane treatment system for luxury resort in El Cid, Mexico. .
System designed to produce 128,000 gpd of potable water.
Project Dugway
Project Manager
Jan 2012 – May 2014
Turnkey delivery of an advanced membrane treatment system for federal testing facility located in Utah. System designed to produce 150,000 gpd of potable water.
Having held positions spanning engineering, project management, and global operations, Megan brings broad organizational experience to her work at Epic. Megan fuses her passions for real estate, resilient design, and water stewardship to accelerate the adoption of sustainable infrastructure solutions.
Empowered Energy Solutions, Inc.
Director of Operations & Project
Manager Aug 2010 - Dec 2011
Managed successful design delivery of multi-disciplinary building and infrastructure projects
CBRE @ Salesforce - Global Real Estate and Workplace Services Program Manager
Sep 2018 - Dec 2020
Oversaw Americas West design and construction program, performing high-level budget and schedule monitoring, vendor onboarding and performance review for delivery of ~1M SQFT in 2019. Developed & maintained Global Workplace Services playbook for operational alignment and workplace process governance of 130+ offices, 5M+ SQFT. Provided regular and ad-hoc reporting to keep client’s executive management apprised of project status
Arup - Global Design Consulting
Project Manager & Senior Engineer (San Francisco)
Nov 2015 - Sep 2018
Built San Francisco Project Controls practice from zero to $75M+ portfolio of technology, infrastructure, and building projects with clients like Google, WeWork, Salesforce, and BART. Implemented financial (earned value), schedule, risk, and change management processes and tools for projects and programs ranging from $10K to $10M.
Project Manager & Engineer
(Hong Kong)
Aug 2012 - Aug 2015
Managed successful design delivery of multi-disciplinary building and infrastructure projects
MEGAN THOMAS, P E , P M P
P R O J E C T D I R E C T O R
PROFESSIONAL EXPERIENCE
Profession:
Civil Engineer
Current Position:
Director of Operations, Epic
Cleantec
Years of Experience:
11 Qualifications:
Bachelor of Science (Cum
Laude), Civil &
Environmental
Engineering; Business
Minor - University of Utah
Project Management
Professional (PMP)
Professional Engineer
(PE)
Salesforce Denver Colorado
Program Manager
Sep 2019 – Dec 2020
64,000 RSF
Design and construction of corporate office build-out including three floors delivered in two phases. My role included onboarding the project team and providing high-level budget, schedule, and risk management.
Commercial Management & Project Controls – Various Projects Project Controls Manager
Nov 2015 – Sept 2018
Brief scope for selected projects provided below. My role was to manage commercial performance of projects & programs in San Francisco, New York, and Toronto. On a given project, this typically included project setup, creation of change and document control procedures, financial forecasting and monitoring, earned value and trend analysis, change management, risk management, cash flow and invoice management, subconsultant cost and scope monitoring, and schedule monitoring.
S E L E C T E D P R O J E C T S
Salesforce Dallas Texas
Program Manager
Jan 2019 – Mar 2020
117,000 RSF
Scope: Design and construction of corporate office build-out including four floors delivered in two phases. My role included onboarding the project team and providing high-level budget, schedule, and risk management.
Selected projects & brief scope:
WeWork Program of Projects - office MEP & IT fit-out
Salesforce Portfolio of Projects - office MEP & IT fit-out Splunk Santana Row - office MEP & IT fit-out
555 Howard - MEP design for hotel/condo development
Stripe 510 Townsend - office MEP & IT fit-out
Finch West LRT - transport planning & multi-disciplinary engineering ($1B project cost) BART Portfolio of Projects - transport planning & engineering, including Bart to Livermore extension
CCTA Portfolio of Projects - transport planning
Bay Area Core Capacity Planning - transport planning
Transbay Transit Center - structural, geotechnical & transport planning design & CA Bay Bridge West Span Bicycle & Pedestrian Path- preliminary design for civil & bridge engineering, lighting & transport planning
Organic Waste Treatment Facilities Phase 1 (O Park 1)
Design Manager
Jan 2015 – Jul 2018
Hong Kong | 5.5 acre site area | $300M
Scope: Design of a Design Build Operate waste to energy facility for all civil, structural, mechanical and electrical elements. The first of its kind in Hong Kong, this facility is receives and processes approximately 83,000 tonnes of source-separated organic waste per year. My role included design & schedule management of the civil, structural, geotechnical and landscape aspects, as well as overall discipline interface management to optimize design input from process, building services, electrical & mechanical teams. With three main buildings and several ancillary structures proposed, I also managed structural design undertaken by international design teams.
Expansion of Tai Po Water Treatment Works and Ancillary Raw Water and Fresh Water Transfer Facilities
Project Coordinator
Mar 2013 – Oct 2015
Hong Kong | $790M
Scope: Contractor’s Principal Designer for Design Build expansion of water treatment works from 400MLD to 800MLD treatment capacity. The design scope of works included design of all facility civil structures and supporting building services as well as water treatment process design and hydraulic design of the plant. My role included design management of international teams, structural design coordination, and overall management of schedule, costing and site safety.
Richard brings 23 years of experience in municipal and private water and wastewater projects. His technical expertise and extensive experience guide his management style with a focus on problem solving. As a registered engineer, he has the knowledge to take an idea to a set of constructible plans. Over the years, Richard has had the opportunity to work on a variety of treatment system technologies and many innovative reuse projects.
Essential Engineering Services
Owner
Mar 2015 - Present
Water and wastewater engineering, civil design, planning, and wastewater engineering,
Summing Engineering, Inc.
Project Manager
July 2005 - Mar 2015
Project manager for single and disciplinary projects. Duties Included oversight of Internal staff and subcontractors for design, permit submittal and support, assisting clients In selecting contractors and evaluating bids, construction assistance, and startup support.
Wastech Controls and Engineering
Project Manager
Apr 2001 - June 2005
Design of piping and control systems to facilitate In-house fabrication of equipment and systems.
RICHARD ROSS, P E
S E N I O R W A S T E W A T E R E N G I N E E R
PROFESSIONAL EXPERIENCE
Qualifications:
Bachelor of Science,
Chemical Engineering
(San Jose State University)
Profession:
Civil Engineer
Current Position:
Director of Engineering, Epic
Cleantec
Years of Experience:
27 A&A Engineering
Project Engineer
June 1998 - July 2000
Design and Implement prototype systems. Responsible for the design, development, contractor oversight, and field testing for water and wastewater treatment system projects.
Stanford College Codiga Resource Recovery Center
Completion Date: 2016
Development of a pilot plant for testing of emerging wastewater system technologies. Treatment processes includes anaerobic fluidized membrane bioreactor (AFMBR) and anaerobic fluidized bioreactor (AFBR) reactors. Flexibility designed to accommodate for pilot testing of trailer mounted future processes.
The infrastructure was designed based on verbal direction and rough sketches from the lead Stanford researchers (Dr. Criddle & Dr. Perry). Since the AFBR and AFMBR processes are not an established technology, reactors were designed from scratch.
In addition, permitting was complicated because the proposed treatment system was something the regulators had never seen before. Close coordination with the permitting agencies was critical to project success.
S E L E C T E D P R O J E C T S
Riverstone Wastewater Treatment Plant (WWTP)
Completion Date: 2016
New WWTP to support a large residential development in Madera, CA. Phased construction from 10,000 gpd to 500,000 gpd sanitary sewage, including effluent lift station with 600 gpm firm pumping capacity with redundancy. Flow through a new 5,000 LF forcemain.
The WWTP had been designed by Provost & Pritchard as an activated sludge system and issued for bid. The lowest bid came back several million dollars more than the owner’s and engineer’s budget. How the wastewater was handled and treated was reimagined with a modular package treatment plant design-build approach.
Napa Berryessa Resort Improvement District
Completion Date: 2014
Wastewater System (low flows of 10,000 gpd up to a peak of 208,000 gpd) to decrease electrical consumption while improving effluent quality to tertiary treatment standards. Treated wastewater effluent storage pond system (22 MG) to meet Regional Board requirements and meet beneficial re-use water goals. Water System (peak 500,000 gpd) upgrades to meet Surface Water Treatment rules.
The wastewater treatment system design consisted of package treatment plant using state of the art pure oxygen membrane bioreactor (MBR) system and a physical-chemical system for combined stormwater/sewage management and treatment.
Anchor Brewing Wastewater Treatment Plant (WWTP)
Completion Date: 2021
Onsite treatment of up to 85,000 gpd process wastewater generated from brewery operations.
Reuse of treated effluent for wash down, cooling towers, and future beer making processes.
Stormwater is also captured on the site for treatment and reuse.
Brewery staff did not want to operate the facility so a water energy purchase agreement was created to allow for the plant to be operated by others with reuse water sent to the brewery.
Resume Page 1
Robert Getter, P.E.
Electrical and Controls Engineering Lead
Mr. Getter brings over 30 years of experience in electrical and controls engineering and design, much of which has been for water-related facilities. His expertise includes design of stormwater diversion and pump stations, sports lighting, and sports park upgrades. He has been involved in over 12 similar stormwater diversion and pumping projects in the past 5 years. His experience includes design of over $500 million construction value for infrastructure facilities.
Representative experience
Project Engineer, TOS-25 Stormwater Diversion Projects, City of LA BOE.
Provided electrical and controls designs for stormwater diversion to on-site infiltration at 9 city parks. Three of the park sites included pump stations, five sites included EV charging stations, and 5 of the park sites included sports lighting upgrades to be constructed on top of the new infiltration basins.
Coordinated with LADWP for new electric services. Prepared control systems designs for integration with the City-wide LA WINS project, linking each of the sites to the City’s central SCADA control center located at Venice Pump Station.
City of Los Angeles Aliso Creek- Limekiln Creek Restoration Project.
Provided electrical and controls designs for stormwater diversion and pumping as subconsultant to Tetra Tech. Aliso Creek is located within a 12,484-acre watershed that conveys upstream runoff from developed portions of the Northridge, Granada Hills, and Chatsworth to the Los Angeles River. The Project included both water quality and park facility improvements, with vegetation and wildlife habitat restoration. Water quality benefits include an increase in infiltrated water and a reduction in TMDLs. The project included dry and up to 10 cfs of wet weather diversion. Diverted flows are conveyed to and pretreated with hydrodynamic separators and then pumped to bioretention basins for additional filtration.
Project Engineer, Reseda Skate Facility, City of LA BOE. Provided MEP design for the Reseda ice skating rink as subconsultant to Brooks & Scarpa Architects. The facility was designed as an ice hockey practice facility, and includes lockers, showers, restrooms, and related support spaces, enclosed within a sprung structure. HVAC design included an AC heat pump system for the lockers, showers and restrooms, and a dehumidifier for the ice rink space.
Humidity is controlled to maintain a dew point temperature that prevents condensation and assures ice surface quality. Air quality monitors are used to control fresh air intake. The facility includes specialty sports lighting for the ice rink, and for an outdoor roller skate park. Refrigeration equipment and the ice floor were designed by a specialty subconsultant.
Sendero Pump Station Upgrades, Santa Margarita Water District (SMWD).
Led electrical design for addition of three 100 HP vertical turbine pumps to an existing recycled water pump station. The installation included soft starters for pump motors, surge tanks, an air compressor, a magnetic flow meter, and modification of the existing switchgear for added manual transfer switch and portable generator connection. ProjectLine was subconsultant to Dudek for this project.
Name of firm
ProjectLine Technical Services
Total years of experience
39 Years with firm
20 Education
MS Environmental Engineering,
Northeastern University, Boston,
MA, 1991
BS Mech Engineering, University of
Kansas, Lawrence, KS, 1984
Registrations/licenses
Professional Engineer (PE): CA,
#E21884;
Professional affiliations
Member, CA Water and
Environment Association
Member Water Environment
Federation
-109-
OPERATIONS,
MAINTENANCE, AND
EVALUATION OF
REGIONAL STORMWATER
CAPTURE AND
TREATMENT PROJECTS
FOR GATEWAY WATER
MANAGEMENT AUTHORITY
-110-
Geosyntec‘>
consultants
engineers I scientists I innovators
Geosyntec‘>
consultants
engineers I scientists | innovators
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
i
-111-
Geosyntect>
consultants
Table of Contents
SECTION 1 Qualifications and Experience ................................ 1 SECTION 2 Organizational Chart and Team Members ....................... 7 SECTION 3 Approach and Understanding ............................... 15 Appendices Appendix A: Resumes of Key Staff
Appendix B: Subcontractor Qualifications
Appendix C: Financial Statement
Geosyntec‘>
consultants
Table of Contents
SECTION 1 Qualifications and Experience ................................ 1 SEC110N 2 Organizational Chart and Team Members ....................... 7 SEC110N 3 Approach and Understanding ............................... 15 Appendices Appendix A: Resumes of Key Staff
Appendix B: Subcontractor Qualifications
Appendix C: Financial Statement
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
1 QUALIFICATIONS AND EXPERIENCE
GEOSYNTEC QUALIFICATIONS
Geosyntec is a multidisciplinary engineering and consulting firm with offices in Los Angeles County and throughout Southern California. In addition, Geosyntec has a California General Contractor License (License No. 766859) and actively provides design-build and other alternative project delivery services. We work with public and private sector clients to address complex problems involving civil infrastructure, natural resources, and the environment. Since 1983, Geosyntec has supported municipalities and government agencies by providing civil, geotechnical, and environmental
engineering services, planning, design,
and construction management. Our
technical practitioners have designed,
constructed, and managed hundreds of
projects and sites of various sizes
worldwide. Geosyntec has a staff of
over 2,000 engineers, scientists, and
other technical and project staff located
in over 100 offices throughout the U.S.,
including over 250 technical
professionals in 11 offices
throughout Southern California.
Geosyntec is a regional and national leader in stormwater management. Our stormwater staff continue to advance the state-of-the-practice through applied research involving government agencies (e.g., State and Regional Water Quality Control Board, US EPA, CalTrans, Los Angeles County, etc.) and industry/academic associations (e.g., ASCE, CASQA, etc.). Geosyntec’s staff and projects have been recognized nationally and regionally for excellence by organizations such as the ASCE, CASQA, and the American Council of Engineering Companies (ACEC).
STATEMENT OF FINANCIAL STABILITY
Geosyntec is financially stable with a strong balance sheet and has the necessary financial and personnel resources to provide services at the level required by the Gateway Water Management Authority. Over the past five years, Geosyntec averaged approximately $500 million in annual gross revenues and remains debt-free. Due to
steady growth and profitability, Engineering
News-Record (ENR) consistently ranks
Geosyntec within the nation’s top 50
environmental design firms. Geosyntec has
had a positive relationship with Citibank since
1992 ($10 million untapped lines of credit).
Our Dun & Bradstreet rating is IR3 (“good
credit approval”). Additional information
regarding financial stability is provided in
Appendix C.
-112-
rumors
. ' 7 i0 In the g, 7% ‘ TOP 9 i , , 9 50 30% 9- ‘ ENRdesignfirms 9| 9 J t 9' 9 $6.09 8 8 II mllllon 9 9 l in revenue ‘91 91 ..H
Geosyntect>
consultants
Geosyntec Southern California Office Locations
A
Staff in Southern
Ventura
Santa Barbara
Los Angeles Westside
Los Angeles Downtown
Pasadena
Ontario
Long Beach
Orange County
San DsiegoDSabre Slgrjrngs an lS?a%°D(I)ego‘glwérr'IItra| MEYER'S nonurwi
exceeds industry average
us EMR 0.66
Geosyntec‘>
consultants
Geosyntec Southern Califomla Office Locatlons
”in.
Staff in Southern
Ventura
Santa Barbara
Los Angeles Westside
Los Angeles Downtown
San DsiegoDSabre Slgrjrngs . H a" '53 flammaba
Pasadena
Ontario
Long Beach
Orange County
In the 130' 50% @W TOP E
ENRdes§nfiQ§ 3% g: 5 t 9- 9 20% $ $600 8 9' 3
9|
. . 9: II million 9 a I 9 in revenue Q1
exceeds industry average
US EMR 0.66
Operations, Maintenance, and Evaluation of Regional Stormwater Capture and
Treatment Projects
2 RELEVANT EXPERIENCE
Geosyntec’s relevant, local, and recent project experience are summarized in table below.
Project Client O&
M
/
O
p
t
i
m
i
z
a
t
i
o
n
SC
A
D
A
/
I
n
s
t
r
u
m
e
n
t
a
t
i
o
n
En
g
i
n
e
e
r
i
n
g
/
P
l
a
n
n
i
n
g
Co
n
s
t
r
i
c
t
i
o
n
/
R
e
p
a
i
r
Re
g
u
l
a
t
o
r
y
C
o
m
p
l
i
a
n
c
e
Tr
e
a
t
m
e
n
t
S
y
s
t
e
m
s
Pu
m
p
i
n
g
S
y
s
t
e
m
s
In
f
i
l
t
r
a
t
i
o
n
S
y
s
t
e
m
s
Di
v
e
r
s
i
o
n
S
y
s
t
e
m
s
St
o
r
a
g
e
S
y
s
t
e
m
s
San Fernando Valley Green Stormwater Infrastructure LA Sanitation Prop O Phase I and 2 Optimization LA Sanitation LAX NCOS Stormwater Pump Station Repair LA World of Airports Los Angeles River Low Flow Diversions LA Bureau of Engineering Bending the River Back into the City Metabolic Studio Wilmington Neighborhood Greening LA Bureau of Engineering Valley Plaza Park North Stormwater Capture LA Bureau of Engineering Descanso Gardens Stormwater Capture Descanso Gardens San Gabriel Valley Superfund Site, Operable Unit San Gabriel Basin El Monte Operable Unit Groundwater Remediation Confidential Client Groundwater Remedy at LA County Pesticide Facility EPA Region 9 Groundwater Treatment System for Nitrate Removal La Puente Valley Water District Palm Springs Aerial Tramway Wastewater Treatment Palm Springs Aerial Tramway Slauson Connect Safe Clean Water LA Sanitation Fulton Playfield Multi-Benefit Infiltration Redondo Beach Bowtie Wetlands Demonstration The Nature Conservancy El Cajon Stormwater Improvement Waste Management Palomar Transfer Station Stormwater Improvement Republic Services -113-
Geosyntec‘>
consultants
Geosyntec‘>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
3 SELECT PROJECT REFERENCES
TOS SN-73: PROP O OPTIMIZATION PHASE
2 – TEMESCAL CANYON DIVERSION &
PUMPING | LOS ANGELES, CA
LA Sanitation
Reference: Gordon Haines, Environmental Affairs Officer, (213) 485-0585, [email protected]
The Temescal Canyon Park Stormwater BMP
project diverts runoff from the Temescal Canyon
storm drain to improve overall water quality at Temescal Canyon / Will Rogers State Beach and to help comply with the Santa Monica Bay Beaches Bacteria TMDL for coliform bacteria. Phase 1 of the Project was designed and constructed in 2011 to divert runoff through pre-treatment to a below-ground storage tank discharging to the sanitary sewer system flowing to the Hyperion Water Reclamation Plant. Phase 2 was designed and constructed in 2017 to treat the water in the storage tank for future park irrigation and included a chlorination treatment system and ancillary building. Since the completion of Phase 2, the system has not been operable. In 2019, LASAN tasked Geosyntec to review project design and components to determine how and where adjustments could be made to improve and restore functionality.
Geosyntec prepared a memorandum detailing the
project's optimization adjustment recommendations.
Of the adjustments recommended, based on scope,
schedule, and budget, LASAN and the Geosyntec
Team prioritized two primary improvements. The first
was installing a slide gate on the diversion structure
inlet pipe to add a capability to shut off flows,
especially persistent dry-weather flows, as part of
O&M procedures to perform inspections and
maintenance for the storage tank safely. Second,
based on hydraulic analysis, it was determined that the existing discharge pumps were oversized for the existing sanitary sewer pipe size, which caused flooding at the park due to backflows. The existing storage tank discharge pumps were replaced with correctly sized smaller pumps, including directly connecting the pump discharge lines to the effluent outlet pipe to create a force main that discharges into the sanitary sewer system. Additionally, two combination air and vacuum valves were installed along the force main to exhaust and admit air when discharging. The Geosyntec Team, including MMC (subcontractor), completed the design and construction of these activities in December 2022.
With the optimization updates completed in December 2022, Phase 1 of the Project can be operated in two ways: Option 1 – as a dry weather low-flow diversion. Option 2 – as a stormwater capture and diversion basin, capable of capturing up to 1.25 MG of runoff per storm event and diverting average 5-10 MG of runoff annually.
Services Provided
• Design-Build
• Pumps Replacement
• Slide Gate Installation
• Construction Management
• Hydraulic Analysis
• Plans, Specifications, and
Estimates
-114-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
4 LAX NCOS STORMWATER PUMP STATION
REHABILITATION | LOS ANGELES, CA
Los Angeles World Airports (LAWA)
Reference: Rosa Brice, PE, CM, Senior Airport Engineer I, (310) 957-7173, [email protected]
The Los Angeles World Airports (LAWA) commissioned
the North Central Outfall Sewer (NCOS) Connection
Project (Project) in November 2019 at LAX, connecting the Imperial Retention Basin to the Hyperion Water Reclamation Plant (HWRP) for stormwater discharges. The Project included the installation of a pump well with three 150 HP pumps that would discharge stormwater from the basin to HWRP. Since its initial commissioning, the Project has not functioned according to its design and has not met the facility’s Industrial Wastewater Permit discharge requirements. LAWA hired Geosyntec Consultants (Geosyntec) in July 2023 to investigate various system failures and identify solutions to restore the functionality of the Project and meet Industrial Wastewater Permit requirements to discharge to HWRP.
Geosyntec performed a series of site investigations to
assess the field conditions of the Project, including
pre-storm, storm, and post-storm events. During
investigations, Geosyntec found submerged electrical
equipment, pump failure due to high moisture,
programming errors, inoperable float switches, and
pressure transducer, missing air release valve, issues
with the existing flow meter, and an inoperable gas
detector. Investigations suggested that the existing
location of equipment and pump operations caused
the submergence of electrical equipment. Geosyntec also coordinated the permit-required confined space entry of a vortex manhole to assess the functionality of a gas detector and recommended relocation of the gas detector for ease of access for future inspection and maintenance.
Geosyntec, via a subcontractor, oversaw and managed the installation of a new pressure transducer and float switches for the pumps and reprogramming of the Programmable Logic Controller to run the pumps in automation at temporary set points while the Project is under additional investigation and repairs. The automation was tested and functioning as intended during a storm event, with programming correctly detecting lead/lag pump sequencing, manual overrides, and pump failure. Geosyntec is currently coordinating the pump repairs through a subcontractor and pump manufacturer and providing long-term recommendations for reinstallation, including cable protection and relocation of junction boxes.
From Notice-to-Proceed in July 2023, Geosyntec successfully got the pump system running in automation for use during the 2023-2024 wet season with one of the three pumps while the other two pumps are being repaired. System automation relieved LAWA personnel from manually operating the pumps during storm events.
Services Provided
• Pump System Failure Investigation
& Troubleshooting
• Pump Repair
• Instrumentation Repolacement
• PLC Programming
• Design-Build
• Regulatory Compliance
-115-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
5 SAN FERNANDO VALLEY GREEN
STORMWATER INFRASTRUCTURE
PROGRAM | LOS ANGELES, CA
LA Sanitation
Reference: Kevin Ho, PE, Civil Engineer, (415) 515-1545, [email protected]
Los Angeles Sanitation (LASAN) implemented a
green stormwater infrastructure program via
alternative project delivery (design-build) in the
San Fernando Valley Basin of Los Angeles to
capture and infiltrate stormwater runoff and
thereby increase groundwater replenishment,
improve downstream receiving water quality of the
Los Angeles River, and reduce localized flooding.
This program consisted of seven project areas in the San Fernando Valley and is expected to capture and infiltrate over an average of 457 acre-feet per year of stormwater runoff from 594 acres of tributary drainage areas through the implementation of drywell systems, storm drain diversions, rain gardens, and catch basins.
Geosyntec provided comprehensive alternative project delivery (design-build) services as a prime contractor to design, permit, construct, monitor, and maintain green street infrastructure over seven different project locations. Geosyntec's scope of services included the development of feasibility studies for similar green stormwater
infrastructure programs in other parts of the City,
implementation of the Small Business Incubator
Program aimed to develop and expand participation
of small business contractors, public outreach,
concept development, preliminary and final design,
permitting and approvals, construction (at risk) and
construction management, and 1 year of monitoring
and maintenance.
This program completed construction in June 2021, installing over 63 drywell systems with pretreatment systems and catch basins, 6 storm drain diversions, 18 rain gardens, and 3 landscaped stormwater medians. Geosyntec also completed 1 year of monitoring and maintenance of the program elements to evaluate performance and operations & maintenance procedures.
Geosyntec completed the design, outreach, permitting, and construction substantial completion in just 17 months of schedule for this $16.8M program. As part of this program, Geosyntec also implemented a Small Business Incubator Program to engage, develop, and expand the pool of local small business contractors to participate in this program as well as other future green stormwater infrastructure projects. Finally, the total change order for this program was zero ($0).
Services Provided
• Design-Build
• Program Management
• Construction Management
• 1-Year Performance Monitoring
• 1-Year O&M
• Post-Construction Optimization
-116-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
6 PROPOSITION O PROJECTS
OPTIMIZATION, PHASE II
LA Sanitation
Reference: Gordon Haines, Environmental
Affairs Officer, (213) 485-0585,
[email protected]
In November of 2004, the City of Los
Angeles passed Proposition O (Prop O),
which authorized the City to issue a series
of general obligation bonds for up to $500
million for projects intended to improve the
water quality and reduce the volume
and/or rate of stormwater entering the
City’s surface waters. Beginning in 2014, Los Angeles Sanitation (LASAN) initiated optimization for a selection of completed Prop O projects with the goals of increasing project resiliency in order to achieve applicable water quality targets and reduce long-term operation and maintenance costs. Eleven projects were selected for optimization as part of the Phase I Prop O Project Optimization effort, and Phase II of the Prop O Project Optimization effort was initiated in 2017, focusing on eight different projects.
Geosyntec was selected to manage the Phase II
optimization contract, which included optimizing eight
of the City’s Proposition O-funded projects. The
scope of work included five main tasks in addition to
overall project management: 1) Confirmation of each
project’s intent and site conditions; 2) BMP
monitoring during both dry and wet conditions; 3)
Project optimization; 4) Reporting; and 5)
Development of operations management manuals
for use by the City operators at each project. In line with these tasks, Geosyntec first reviewed construction contract design plans and specifications, operations and maintenance manuals, and relevant watershed hydrology and water quality information to confirm project design intent with respect to performance. Geosyntec conducted numerous site inspections and monitored BMP performance, including management of data collected by BMP flow meters and water quality sampling, which informed the recommendations for each project in the Monitoring Plan and the preparation of the Annual and Wet-Weather Performance Reports. Geosyntec also prepared Operations Management Manuals for each project, which include Standard Operating Procedures and Field Guides to be utilized by maintenance personnel.
Geosyntec successfully managed more than ten subconsultants to complete the scope of work within budget and on task. The resulting optimized performance of the Prop O Phase II projects is essential for delivering the intended design outcomes. The quantification and reporting of BMP performance at each project has been instrumental for the City in demonstrating achievement of water quality improvement targets and estimating the volume of captured runoff infiltrated for water supply augmentation.
Services Provided
• Project Management
• Monitoring Oversight and
Coordination
• Design Review
• Site Inspections
• Optimization Recommendations
-117-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
7 ORGANIZATIONAL CHART AND TEAM MEMBERS
PROJECT TEAM
Members of the Geosyntec team, illustrated in the organizational chart below, have extensive experience in the required Project disciplines and have a long history of working with one another in close collaboration on similar projects. Due to this careful selection of our Project team, the roles and responsibilities of each team member are well defined, resulting in a cohesive unit with complementing skills and resources. Summaries of our key personnel experience are provided in this section. Resumes for the Geosyntec team key staff, including subconsultants, are included in Appendix A.
ORGANIZATIONAL CHART
KEY PROJECT PERSONNEL
Our key project personnel led by Project Director Chris Wessel and overall Project Manager Yoshi Andersen, followed by our subcontractors, are provided below. Resumes are included in Appendix A.
-118-
Praia-ct Direct-3r
CWWBMPEOSDP
Geosyntect>
consultants
@
lmln mi
Technical Advisor Proiect Managers
Yoshi Andersen, EiT Daniel Lee, PE. CCM‘
Pmiflemy, PE SmphanieZinn, GPM‘SM Regionat Health 6: Safety Manager JoeeAvine, PE . Haley m PE Madison McLaughlin-I, MPH, 05F: USP Sam Hwang. PE. ENV SP
Project Support
Operations 3. SCADA 8: Engineering
Maintenance Instrumentation Daniel Lee, PE. COM
Jeff Wfliiams, COM Stephen Erode, EEng. Hamid Amini, PhD, PE Juan Vidarle mm“ Jerko Kodian. PhD. PE. GE
Scott Sparkes Bra! Richam Gonzalez. PE
Damn Services Alex Lin. PE
united Sm Water
Construction & Repair iilegulemm",T Compliance
Levi Walden MM, GPSWO, I'GP TOR.
John Ttotler Julie Waiters. CPSWO. OISP. QSD
innovatiw Common Solutions Alyssa Yu. EIT
American migrated Services Kayiin Boekman
mammmmmmw
Geosyntect>
consultants
WA
Project DireLtor Project Managers Technical Advisor
Chris Weasel, PE, 0304’ Yoshi Andersen, EIT Daniel Lee, PE. CCM PhilReidy, PE Stephanie-211m, CPMSM Regional Health 5: Safety Manager ifymfi Hudson McLaughlin. MPH, (:52 am
Sam Hwang. PE. ENV SP
Project Support
Operafions a. SCADA 8. Engineering
Main1enance Instrumentation Daniel Lee. PE. COM
Jeff Williams, CCM phen Brodie, REng. Hamid Amim', PhD. PE Juan Vidane Mariam Jako Kooijan. PhD. PE. GE
Scott Sparkes Bull Ethan! Gonzmez, PE
00mm Services Alex Lin, PE
(hiked Swan was
Confluction & Repair Regulmmy Compliance
Levi Walden MM, GPSWO, IGP TOR,
John Trotter Jule Walters. CPSWQ. QISP. QSD
Innovative Construction Solarium Alyssa Yu. ElT
Amman Integrated Services Kaylin Boekman
‘ mamdemmymm \
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
8 CHRIS WESSEL, PE, QSD/QSP | PROJECT DIRECTOR
Chris has over 15 years of experience in hydraulics, hydrology, computer modeling, and stormwater management. In his fourteen-plus years at Geosyntec, his project experience has included topics such as stormwater planning and BMP design and optimization; hydraulic and hydrologic modeling, with an emphasis on BMP design and evaluation; environmental planning for MS4 Permit compliance; stormwater pollution prevention plan development and NPDES permitting under the California Construction General Permit; and compliance monitoring programs. Chris managed multiple optimization contracts for BMP performance for the City of Los Angeles. He is currently managing on-call environmental support with Los Angeles World of Airports. Overseeing a variety of environmental projects at LAX. He has also led the modeling and development of numerous WMPs in the LA area and is supporting LA Metro in establishing their LID and CGP programs.
YOSHI ANDERSEN | PROJECT MANAGER
Yoshi Andersen, EIT, has over 5 years of experience working on various projects such as stormwater infrastructure planning, civil design, dry and wet- weather flow monitoring, strategic water resources management, construction management, regulatory compliance, and investigatory fieldwork. Yoshi has helped clients apply for grant funding under the IRWM Program and the LA County Safe Clean Water Program and understands the organization and communication required to develop multi-jurisdictional projects. In construction, Yoshi has managed multiple subcontractors to deliver successful stormwater infrastructure projects using communication and organizational skills to keep complex projects moving forward. Combining hydrology and hydraulics analysis, experience developing stormwater infrastructure, and an understanding of multi-benefit projects, she has helped clients progress project concepts to place BMPs within their watersheds to maximize benefits strategically.
DANIEL LEE, PE, CCM | TECHNICAL ADVISOR / ENGINEERING
Daniel has over 19 years of experience working on various public and private infrastructure projects in various phases of the project life cycle, including planning, engineering design, permitting, regulatory compliance, and construction management. His experience focuses on development of stormwater facilities (treatment, capture, reuse, and infiltration); water infrastructure (treatment, storage, and distribution); land development projects; and general civil infrastructure. Other work experience includes alternative project delivery (design-build), construction management, hydrology and hydraulics modeling; green streets design; infrastructure planning; and design of streets, drainage, and sanitary sewer facilities.
15 YEARS
EXPERIENCE
5 YEARS
EXPERIENCE
19 YEARS
EXPERIENCE
-119-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
9 PHIL REIDY, PE | PROJECT MANAGER
Phil has been with Geosyntec for 13 years and has more than 30 years of experience in geotechnical and water resources engineering, environmental assessments, and remediation throughout the United States and Malaysia.
His expertise includes green infrastructure/urban drainage, control systems and remote sensing, and commercial-scale stormwater capture and reuse systems. Phil is currently managing the design of the Descanso Gardens Stormwater Capture project, which has many of the features similarly found in the GWMA’s five regional projects, including diversion, pumping, storage, infiltration, treatment, reuse, and instrumentation.
STEPHANIE ZINN, CPMSM | PROJECT MANAGER
Stephanie Zinn has over 14 years of experience in NPDES water quality compliance, multi-benefit water supply solutions, remote sensing research, and water resource policy. Stephanie has managed teams to execute work related to planning, regulatory compliance, permitting, and implementation of stormwater solutions with a lens of equity and community needs. She also has experience evaluating urban runoff diversion projects, regional water recycling systems, and reservoir operations, from planning and feasibility through to final engineering. Her passion is to help her clients implement practical multi-benefit water resource solutions to provide for a diverse water supply portfolio and improved watershed health.
More recently, she has worked with municipal clients in Southern California to view stormwater as a resource and implement stormwater programs in an efficient and effective manner to meet and exceed compliance requirements. She has managed complex water supply and infrastructure analyses as part of EIR technical reports for citywide planning efforts.
HAMID AMINI, PHD, PE | ENGINEERING LEAD
Dr. Amini is a Senior Principal in the process engineering and geo- environmental groups of Geosyntec Consultants and leads Geosyntec’s firm- wide process engineering practice group. Hamid has provided his technical knowledge and experience to a wide range of projects in his years of experience. These projects have involved water and wastewater management process engineering design and construction, sustainable solid waste management design and construction, compliance monitoring, renewable energy generation, hydroelectric power plant design, construction management, and construction quality assurance. Hamid also has experience conducting feasibility studies and preparing detailed cost analyses and technical specifications. For this project, he will be the task leas for engineering and technical services.
30 YEARS
EXPERIENCE
14 YEARS
EXPERIENCE
23 YEARS
EXPERIENCE
-120-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
10 JOSE AVINA, PE | PROJECT MANAGER
Jose brings over 8 years of experience in civil design, construction oversight, and stormwater management, emphasizing O&M and system optimization.
His expertise extends throughout the project lifecycle, from initial design to construction and post-construction monitoring. Jose has worked with various clients to develop designs prioritizing ease of use, maintenance, and operational efficiency. He has experience collaborating with O&M teams from local municipalities to ensure that designs are functional and optimized for long-term performance. His post-construction monitoring experience includes overseeing the functionality of stormwater infrastructure, such as infiltration BMPs and pump equipment, further highlighting his commitment to optimizing system performance and reliability.
HALEY BAUER, PE | PROJECT MANAGER
Haley Bauer has over 6 years of experience working on various private and public development projects, including engineering design, construction and post-construction water quality compliance, hydrology and hydraulics, and construction management. Ms. Bauer’s most recent experience includes the development of affordable housing land development projects, stormwater Best Management Practice (BMP) design, and water quality compliance in California. Before her work in California, Ms. Bauer spent 2 years as a stormwater engineer for the Minnesota Pollution Control Agency, and during this time, she developed standards and guidance documents for the state’s State Revolving Fund (SRF) Program, provided technical review and design support for municipalities applying through the SRF program, and helped write the state’s 2018 NPDES/SDS Permit for Construction Activity.
JEFF WILLIAMS | OPERATIONS & MAINTENANCE LEAD
With over 40 years in corporate Construction Quality Assurance and Control (CQA/CQC), construction risk management, scheduling, permitting, and cost estimating, Jeff’s experience includes: multiple jobsite supervision; remote sites, preparation and implementation of CQC manual; scheduling; safety indoctrination and training of company and subcontractor personnel; construction systems analysis and development; evaluation of architectural and structural drawings; RFI and change order processing; project engineering management; supervision of on-going construction and materials testing; and verification of all inspections and testing, estimating, and sales.
8 YEARS
EXPERIENCE
6 YEARS
EXPERIENCE
40 YEARS
EXPERIENCE
-121-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
11 STEPHEN BRODIE, P.ENG | SCADA & INSTRUMENTATION LEAD Stephen Brodie is a process and project engineer with a focus on water and wastewater treatment. He is a Professional Engineer with 12 years of experience within the mining, municipal, food and beverage, shale gas, and heavy oil industries. His expertise involves engineering design, cost estimation, procurement, and construction management of water and wastewater treatment systems. He also has experience in providing onsite technical services across North America including piloting, plant optimization, field investigations, operator training and commissioning. His attention to detail and technical competence enables him to find solutions and lead projects effectively.
LEVI WALDEN | CONSTRUCTION & REPAIR LEAD
As a general contractor and construction manager, Levi has over 16 years of experience in civil and mechanical construction, primarily in pump stations, treatment systems, storage systems, and pipelines. He has been involved with projects from concept design to construction and final completion, including project change orders, RFIs, submittals field engineering, cost estimating, scheduling, value engineering, construction, construction monitoring, testing, inspections, and operations and maintenance for underground utilities (sewer, water, and storm drain), green street infrastructure (bioswales, rain gardens, and permeable pavement), stormwater capture and reuse, pump stations, and water treatment.
MISTY STEELE | REGULATORY COMPLIANCE LEAD
Misty has over 20 years of experience in environmental consulting, including regulatory compliance program management, stormwater general permit compliance, and routine monitoring and reporting activities. Misty is an Industrial General Permit (IGP) Trainer of Record, a Qualified Industrial Stormwater Practitioner (QISP), and a Construction General Permit (CGP) Qualified Stormwater Pollution Prevention Plan Developer/Practitioner (QSD). She currently leads the local stormwater compliance practice and team in Orange County.
16 YEARS
EXPERIENCE
20 YEARS
EXPERIENCE
12 YEARS
EXPERIENCE
-122-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
12 KEY SUBCONTRACTORS
Inframark has been delivering best-in-class, full-
service contract operations, maintenance, and
management of municipal water and wastewater
treatment facilities and lift stations since 1983, and
over 25 years in California. They have over 560 water and wastewater facilities under management for municipalities of all sizes, including 12 clients and their communities in California. They provide technical support with on-site, regional, and national experts throughout the design,
construction, commissioning, and startup of treatment
systems, maintaining an exceptional compliance track
record.
Inframark recently won a contract with the City of Burbank to provide O&M for a 12.5 MGD wastewater treatment
plant, serving a population of approximately 105,000
people. Additionally, Inframark manages their Industrial Pretreatment Program and the Illicit Stormwater Program.
Brax Company, Inc. (Brax) was founded in 1986 in San Diego, California. Since its inception, it has stood out in the industry with its unwavering commitment to providing the highest-quality pumps, process equipment, and services in all markets. Brax is a "one-stop shop" offering all aspects of pump and process equipment engineering design, replacement, repair,
and servicing. Because of this, they have on-staff
mechanical engineers, are fully licensed and bonded
through CSLB with Class A, C-57, C61/D21 & C-10, and
can manage every aspect of a project. In support of the expanding need for quick turnaround of replacement
units and repairs, Brax now has three full-service
facilities between San Diego, Inland Empire &
Bakersfield, with an average of $1M in inventory between all locations and full-service machining capabilities up to 30" in house, trained service technicians and full-service crane service trucks up to 50T.
Their full-service machine shops allow them to expedite all repair services even when parts have been
discontinued or are hard to find. They will disassemble, inspect where applicable, and provide a top-quality
system rebuild and reassembly to avoid expensive
equipment replacement.
Geosyntec & Brax are currently working together
to repair and upgrade existing pumps for LAX
NCOS Stormwater Pump Station.
-123-
Geosyntect>
consultants
©INFRAMARK
INFRASTRUCTURE MANAGEMENT SERVICES
Geosyntect>
consultants
INFRAMARK
INFRASTRUCTURE MANAGEMENT SERVICES
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
13 Downstream Services, Inc. is a certified small business enterprise, incorporated in 2001, and is recognized for its dynamic approach and professionalism within the
environmental industry. They specialize in assessing,
maintaining, and rehabilitating stormwater, wastewater, and underground utility systems. Currently, Downstream
Services retains 77 employees between two locations in
Escondido, CA, and Ventura, CA. Their technicians are
experienced in maintaining, inspecting, and
assessing pump and instrumentation systems,
pipelines, detention and retention basins,
hydrodynamic separator units, green infrastructure, trash and debris screens, and other stormwater BMPs.
Their highly skilled personnel and substantial fleet of specialty equipment serve the needs of California communities, delivering quality service and customer experience centered on the client’s goals and objectives. In accordance with the Clean Water Act and the National Pollutant Discharge Elimination System Permit Program (NPDES), they have established a dedicated division to assist clients with compliance with federal, state, and local regulations. Downstream Services works closely with various stormwater product manufacturers to offer dependable, cost- effective solutions.
United Storm Water has been in business since 1999
and was incorporated by the owners of United Pumping
Service, which has been among the forerunners in
hazardous waste transportation since 1970. This family- owned and operated Minority Business Enterprise
(MBE) has a long-standing history and experience in
stormwater management and maintenance. United Storm Water is a qualified firm having demonstrated experience and expertise including but not limited to:
• Storm drain inspection & monitoring
• Trash quantification
• Conveyance system maintenance
• Channel cleaning
• Pump house and lift station cleaning
• Sand filter maintenance
• Fabrication and installation of LA
County-approved BMPs (filter inserts,
automatic retractable screens,
connector pipe screens, etc.)
• Certified Contech maintenance
provider
• Hazardous waste removal
-124-
Geosyntect>
consultants
C Services, Inc.
:mwmr 57W 7. .
UNITED STORM WATER, INC.
' Protecting Our Water Resources
Apr19. 2022 12.441011 PM , n _ Mr 19‘ 2022125119 PM
12720 Manifold Skeet. ‘. - . ‘ 12731 Monfinrd 5t
L05 Angeles Ca ' ‘ ’. Los Angel
Caiifu: -' ‘v -
Geosyntect>
consultants
C Services, Inc.
\P" 1‘».
‘ >143}: . .‘JGJI’HU may
UNITED STORM WATER, INC.
' Protecting Our Water Resources
Apr 1910221244100 PM , ' -_ A'pr 194 2022 12.51119 PM
12720 Monflofd Street_ 5 ‘ 12731 Mont d S
Los Angeles Cnumy ‘ . , , ' Cahfnrma
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
14 Innovative Construction Solutions (ICS) is a fully integrated environmental construction company delivering and implementing turnkey self-perform construction solutions to environmental challenges in water (groundwater, stormwater, water/wastewater). ICS is a licensed Class A general engineering contractor in CA certified to perform
hazardous substance removal. They also possess a California Demolition (C-21) license. ICS employs 170 employees, owns and operates a large fleet of specialty and heavy
equipment, and carries a $ 125 million bonding capacity.
ICS provides diverse capabilities and services, including:
• Stormwater capture, treatment, and infiltration
• Retention basins and reservoirs
• Wastewater and wastewater treatment systems
• Mechanical systems
• Heavy civil (excavations, shoring, and foundation)
• Structural concrete
• Environmental remediation
• Transportation and disposal
• Hazardous waste management
American Integrated Services (AIS) is a full-
service, minority-owned (MBE) company specializing
in environmental construction and remediation,
industrial demolition and abatement, waste management,
and specialty transportation services, industrial cleaning services, and 24/7 emergency response. AIS is recognized as an industry leader in turn-key environmental services, ranking in the top 30 of Engineering News-Record’s (ENR) “All Environmental Firms” for the last five years.
AIS has eight office locations and equipment yards
stationed strategically throughout California. AIS employs over 450 employees, including a large field staff consisting of heavy equipment operators and environmental
technicians, construction and confined space trained rescue crews, and hazardous waste certified drivers. Most of their staff are cross-trained in areas including confined space and trench/excavation and are all certified per OSHA and/or DOSH requirements.
AIS owns over $45 million dollars in equipment and assets, including excavators, loaders, dozers, backhoes, bobcats, hazardous certified transportation vehicles (vacuum trucks, hydro vacs, roll-off trucks, drum trucks, flat beds, end dumps), and over 450 hazardous certified and specialized roll-off bins.
Additional subcontractor qualifications for InfraMark, ICS, and Brax are provided in Appendix B. -125-
'nnovative
Construction
Solutions. inc.
W - , W3” Wig/Mags m
\
Geosyntect>
consultants
Geosyntect>
consultants
'nnovative
Construction
Solutions. inc.
f
WW Ian/12%; m
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
15 APPROACH AND UNDERSTANDING
STORMWATER EXPERTISE
Geosyntec’s Southern California operations have been
providing surface water and stormwater technical
solutions to clients for almost 35 years; Geosyntec
currently maintains a staff of approximately 250 full-time employees in 11 offices in Southern California, allowing us to provide the bench strength that GWMA and its
member agencies may need on a project-specific basis.
Geosyntec’s engineers and scientists are technical
leaders in stormwater management.
Geosyntec’s comprehensive background in local
stormwater infrastructure planning, design,
permitting, regulatory compliance, construction,
monitoring, and maintenance is unique. Our
extensive experience in each of these areas will be
leveraged to:
• Tackle complex issues and problems
• Recommend and implement cost-effective
solutions for long-term success
• Navigate ever-evolving regulatory compliance requirements • Optimize systems for increased reliability, better performance, and reduced maintenance • Understand and see the “big picture” for operations and maintenance (e.g., water quality drivers, regional planning efforts for infrastructure and O&M resources, standardization of practices, materials, and equipment, etc.)
PROJECT MANAGEMENT AND STAFFING
Geosyntec will assign a project manager and appropriate technical leads and subcontractors for each project depending on the project scope (e.g., O&M, engineering design, permitting, etc.).
We have a deep bench of experienced project managers and technical leads. Our selected project managers have relevant technical backgrounds and excel in communications, project coordination, and scope, budget, and schedule management. Our selected technical leads are senior personnel with demonstrated expertise and will lead the delivery of relevant scope while working with the selected project manager. All fieldwork, including O&M and construction, will be implemented by our subcontractors and supervised by qualified Geosyntec personnel. Field reports will be generated for each day of fieldwork.
HEALTH & SAFETY
Health and safety are an absolute priority for all fieldwork. Geosyntec will develop and implement a Health & Safety Plan (HASP) and conduct Task Hazard Analysis (THA) for all fieldwork for each project. In addition, our standard health and safety practices include the following:
Geosyntec re-evaluated hydraulic design, re-sized
and replaced discharge pumps, and modified
discharge configuration to optimize stormwater
discharge for Temescal Canyon Park Stormwater
-126-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
16 • Review and incorporate health and safety requirements from the Owner. • Geosyntec requires all subcontractors to be in good standing for health and safety records. Subcontractor health and safety records are reviewed every year for compliance.
• Require subcontractors to implement their own HASP consistent with Geosyntec’s HASP. • Require appropriate training and qualifications (e.g., confined space entry) where applicable.
• Conduct daily tailgate health and safety meetings.
• Conduct routine safety site visits and audits by the Geosyntec health and safety manager.
OPERATIONS AND MAINTENANCE (O&M)
Having delivered similar projects in various capacities, Geosyntec is intimately familiar with the anticipated O&M elements, which may include the following:
• Sediment and trash removal
• Custom and packaged treatment
systems (e.g., Wahaso Rainwater
Harvesting)
• Pumps, valves, and pipes
• Instrumentation, including sensors,
monitors, switches, gauges, alarms, etc.
• SCADA (Supervisory Control and Data
Acquisition) and PLC (Programmable
Logic Controller) programming and
controls systems
• Electrical equipment (e.g., motor control
centers, variable frequency drives,
switchboards, etc.)
• Other O&M improvements, including
access, lighting, ventilation, and security
• O&M inspections and database
Our O&M approach is a continuous loop process that involves routine inspections and maintenance, evaluation and implementation of improvements with approval by the Owner, analysis and validation of performance, and updates to the O&M program. In the long term, our approach will increase reliability, enhance performance and safety, reduce regulatory risks, and reduce O&M burdens.
SCADA AND INSTRUMENTATION
Geosyntec routinely designs and works with process mechanical systems involving complex instrumentation in treatment and pumping systems. As part of this effort, we routinely work with SCADA and PLC programming contractors during systems testing, start-up, and commissioning phases. More importantly, our team understands the fundamental connection between design intent and control systems. As such, we have a deep understanding when it comes to diagnosing Inspections &
Maintenance
Adjustments &
Improvements
Performance
Validation
O&M Update
Geosyntec’s O&M approach includes continuous feedback
and adjustments to improve O&M program
-127-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
17 and troubleshooting system issues (e.g., design
flaws vs defective construction/equipment vs
illogical programming).
Our key subcontractor, Inframark, specializes
in and has been providing advanced
automation and intelligence solutions through
SCADA for over 560 water and wastewater
agencies. Their capabilities include:
• SCADA and PLC design, installation,
commissioning, and programming
• Control panel manufacturing
• Hosted (off-site) SCADA
• Remove proactive monitoring
• Data analysis and customized data dashboards
• Applied machine learning
ENGINEERING AND TECHNICAL SERVICES
Because we have over 250 professional staff in Southern California, Geosyntec will be ready to respond to most engineering and technical service requests, including emergency responses, promptly with in-house and local personnel. Geosyntec’s in-house engineering capabilities include civil, geotechnical, environmental, mechanical, process, structural, instrumentation, and electrical engineering, and we have been providing engineering and technical services to many of the municipal, regional, state, and utility agencies throughout California for decades. Specifically, our local stormwater engineering and technical expertise include:
• Feasibility studies and grant funding applications (e.g., Safe Clean Water Program) • Stormwater and watershed master planning
• Hydrology and hydraulics analysis
Geosyntec investigated, troubleshoot, and updated PLC
programming to restore automation and partial capacity
for a 50-cfs stormwater pump station at LAX Airport.
Geosyntec developed civil design for the Los Angeles River Low Flow Diversions Project for the City of LA -128-
Geosyntect>
consultants
Geosyntect>
consultants
Operations, Maintenance, and Evaluation of
Regional Stormwater Capture and
Treatment Projects
18 • Drainage and water quality studies
• Geotechnical investigations
• Preliminary design reports
• Plans, specifications, and estimates
• Scheduling
• Environmental and construction approvals and permits
• Construction bid phase support
• Construction management, administration, and inspections • Post-construction inspections and monitoring
• Regulatory compliance and reporting
CONSTRUCTION AND REPAIR
Geosyntec carries a California General Contractor license and has been actively implementing design-build projects as the prime contractor (we carry the “contract”). Because of our experience and capabilities in project delivery, we streamline the implementation of construction, big and small, and
repair work for our clients. While
Geosyntec does not self-perform
construction work, we partner with
preferred subcontractors to perform
work, and we maintain full control of
the subcontractor work through
subcontracting, coordination, and
oversight.
We can successfully oversee and
deliver construction projects as the
design-builder because 1) many of
our local professionals have a
background in construction as
general contractors and/or as
construction managers, and 2) we
maintain long-standing relationships
with high-caliber subcontractors. This
brings about some key benefits to the client:
• Design integrity is maintained throughout the construction because we are responsible for construction oversight and field quality control.
• There is less risk for the client because a single entity is responsible for design, construction, and warranty.
• There is a single point of contact for the client throughout the entirety of the design, construction, and post-construction phases for any issues (e.g., performance). • There are potentially significant savings in schedule and administrative costs if there is no separate procurement of construction contractors.
Geosyntec designed and substantially constructed over $17M of green stormwater infrastructure, including over 60 drywells, for the City of LA in just 18 months. Geosyntec also provided 1 year of performance monitoring and maintenance for the built green stormwater infrastructure. -129-
Geosyntect>
consultants
GBOSyntec D
consultants
—»»—»-—- __ _‘1‘"“_h_—,—
_ K V
,- L M I“, W; .7 ‘.
' . — mu,
7 It .
Appendix A:
Resumes of Key Staff
-130-
CHRISTOPHER WESSEL, P.E., QSD/QSP stormwater management MS4 permit compliance
watershed planning
monitoring
EDUCATION
M.S., Civil Engineering, University of California, Los Angeles, 2009 B.S., Civil Engineering, University of California, Los Angeles, 2007
REGISTRATIONS AND CERTIFICATIONS
Professional Civil Engineer (P.E.), California, Number C78522 Qualified SWPPP Developer/Practitioner, California, Number 20321
CAREER SUMMARY
Chris Wessel, P.E., QSD/QSP, is a Senior Principal Engineer and Qualified SWPPP Developer and Practitioner. He has over 15 years of experience in watershed planning, hydrology, computer modeling, and stormwater management. In his fourteen years at Geosyntec, his project experience has included topics such as stormwater planning and BMP design; hydraulic and hydrologic modeling, emphasizing BMP design and evaluation; environmental planning for MS4 Permit compliance; and BMP performance and optimization. Mr. Wessel is Geosyntec’s project manager for on-call environmental support with LAWA, overseeing a variety of environmental projects at LAX. He has also led the modeling and development of numerous WMPs in the LA area; managed the optimization of eight regional stormwater projects for the City of Los Angeles; and is supporting LA Metro with the establishment of their LID and CGP programs.
City of Los Angeles Optimization of Eight Proposition O Stormwater Projects, City of Los Angeles Bureau of Sanitation. Los Angeles, CA. Project Manager overseeing the optimization of eight regional stormwater BMPs funded via Prop O. Project duties include design review and summaries; wet and dry weather monitoring; optimization adjustment activities; performance reporting; and the development of operations management manuals, to support the City with the transitioning of the projects from completion of construction to O&M.
Safe Clean Water (SCW) Program Feasibility Study Development, Los Angeles County, CA. Mr.
Wessel has managed and/or supported multiple projects throughout Los Angeles County applying for SCW Regional Program funding, including Fulton Playfield in Redondo Beach, the Slauson Connect Clean Water Partnership, and LA Metro Orange Line, among others. Support has included -131-
Geosyntec"
consultants
Geosyntec'>
consultants
Christopher Wessel, P.E., QSD/QSP