Cities Index.
Agenda packet, first session

Berkeley City Council
September 26, 2023

Document
Agenda packet, first session
Meeting
September 26, 2023
Body
Berkeley City Council
Pages
430
Original file
97.5 MB
Text extracted from the city's file for reading and search. The city's original file is the official record.
Page 131 of 263 ends
Page 297 ends

MAINT.

PUMP

OPEN TO
BELOW
GEN.

OPEN TO
BELOW

OPEN TO
BELOW

OPEN TO
BELOW

OPEN TO
BELOW

OPEN TO
BELOW

OPEN TO
BELOW

OPEN TO
BELOW

STAIR B

MEZZANINEMEZZANINE

MEZZANINE

MEZZANINE

MEZZANINE

MEZZANINE

MEZZANINE
MEP/

STORAGE
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
#01 #02 #03 #04 #05
#06
#07
#08
#09
#10
#11#12
#13
#14
#15
#16

UNIVERSITY

CALIFORNIA
1A4.1
30'-0"5'-3"90'-2"
65'-6" 90'-1"
17'-7"
30'-0"
61'-2"
4'-6"30'-0"30'-0" 4'-6" 30'-0"
8'-2" 5'-5"
210'-0"
64'-6"64'-6"
12'-4"
137'-10"
210'-0"
30'-0"5'-3"89'-6"13'-0"
137'-10"
4'-1" 2'-2"
2A4.2
2'-4"
6'-0"
40'-10"
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

03.16.2023 DRC HEARING SET

04.27.2023 ZAB HEARING SET
LEVEL 2

FLOOR PLAN
A2.2
N
1 -
PLAN AT LEVEL 2
3/64"=1'-0" @ 11x17 3/32"=1'-0" @ 24x368 0416
ATTACHMENT 2
ZAB 05-11-2023

Page 13 of 44 ends
Page 132 of 263 ends
Page 298 ends

DOUBLE-HEIGHT
LOUNGE
(EVERY OTHER
FLOOR)
LOUNGE
DECK
MEP/

STORAGE
1A4.1
30'-0"5'-3"89'-7"
90'-11" 16'-0" 89'-7"
17'-7"
30'-0"
61'-2"
4'-6"30'-0"30'-0" 4'-6" 30'-0"
101'-10"
8'-2" 5'-5"
210'-0"
64'-6"64'-6"
13'-0"
137'-10"
210'-0"
30'-0"5'-3"89'-6"13'-0"
137'-10"
4'-1" 2'-2"
2 A4.2
2'-4"
6'-0"
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
#33, 66, 99, 132#34, 67, 100, 133#35, 68, 101, 134#36, 69, 102, 135#37, 70, 103, 136#38, 71, 104, 137 #17, 50, 83, 116 #18, 51, 84, 117#19, 52, 85, 118#20, 53, 86, 119 #21, 54, 87, 120 #22, 55, 88, 121
#23, 56, 89, 122
#24, 57, 90, 123
#25, 58, 91, 124
#26, 59, 92, 125
#27, 60, 93, 126#28, 61, 94, 127
#29, 62, 95, 128
#30, 63, 96, 129
#31, 64, 97, 130
#39, 72, 105, 138
#40, 73, 106, 139
#41, 74, 107, 140
#42, 75, 108, 141
#43, 76, 109, 142#44, 77, 110, 143
#45, 78, 111, 144
#46, 79, 112, 145
#47, 80, 113, 146
#48, 81, 114, 147
#49, 82, 115, 148 #32, 65, 98, 131
LEVELS 3-6

FLOOR PLANS
A2.3
N
1 -
PLAN AT LEVELS 3-6
3/64"=1'-0" @ 11x17 3/32"=1'-0" @ 24x368 0416
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 14 of 44 ends
Page 133 of 263 ends
Page 299 ends

DOUBLE-HEIGHT
LOUNGE
(EVERY OTHER
FLOOR)

STAIR B
LOUNGE
DECK

PRIVATE PATIO
25'-0"
2-BR
2-BR
2-BR
2-BR
1A4.1
30'-0"5'-3"89'-7"
90'-11" 16'-0" 89'-7"
17'-7"
30'-0"
61'-2"
4'-6"30'-0"30'-0" 4'-6" 30'-0"
101'-10"
8'-2" 5'-5"
210'-0"
64'-6"64'-6"
13'-0"
137'-10"
210'-0"
30'-0"5'-3"89'-6"13'-0"
137'-10"
4'-1" 2'-2"
2 A4.2
2'-4"
6'-0"
MEP/

STORAGE
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME

STAIR A
#163
#164#165#166#167#168 #150 #151 #152 #153
#154
#155
#156
#157
#158
#160
#149#169
#170
#171
#172
#173
#174
#175
#176
#177
#178
#179
#161
#162
#159
2-BR

PRIVATE PATIO
2-BR 2-BR
LEVEL 7

FLOOR PLANS
A2.4
N
1 -
PLAN AT LEVEL 7
3/64"=1'-0" @ 11x17 3/32"=1'-0" @ 24x368 0416
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 15 of 44 ends
Page 134 of 263 ends
Page 300 ends

OPEN TO BELOW
LOUNGE
BELOW

PRIVATE PATIO

STAIR B
1A4.1
30'-0"5'-3"89'-7"
90'-11" 16'-0" 89'-7"
17'-7"
30'-0"
61'-2"
4'-6"30'-0"30'-0" 4'-6" 30'-0"
101'-10"
8'-2" 5'-5"
210'-0"
64'-6"64'-6"
13'-0"
137'-10"
210'-0"
30'-0"5'-3"89'-6"13'-0"
137'-10"
4'-1" 2'-2"
2 A4.2
2'-4"
6'-0"

STAIR B

STAIR A
2-BR2-BR
MEP/

STORAGE
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME
FRAME 2-BR
#192
#193#194#195#196#197 #181 #182 #183 #184
#185
#186
#187
#188
#189
#180#198
#199
#200
#201
#204
#205
#206
#207
#203
#191
#190#202

OPEN TO BELOW

PRIVATE PATIO
2-BR 2-BR

PRIVATE PATIOPRIVATE PATIO

PLAN AT
LEVEL 8
A2.5
N
1 -
PLAN AT LEVEL 8
3/64"=1'-0" @ 11x17 3/32"=1'-0" @ 24x368 0416
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 16 of 44 ends
Page 135 of 263 ends
Page 301 ends

UNOCCUPIED ROOF DECK
W/ 15% SOLAR READY AREA

ELEVATOR

OVERRUN
152SF

OPEN TO BELOW

OPEN TO BELOW
1A4.1
30'-0"5'-3"89'-7"
90'-11" 16'-0" 89'-7"
17'-7"
30'-0"
61'-2"
4'-6"30'-0"30'-0" 4'-6" 30'-0"
101'-10"
8'-2" 5'-5"
210'-0"
64'-6"64'-6"
13'-0"
137'-10"
210'-0"
30'-0"5'-3"89'-6"13'-0"
137'-10"
4'-1" 2'-2"
2 A4.2
2'-4"
6'-0"

OPEN TO BELOW
STAIR

BULKHEAD
223SF
STAIR

BULKHEAD
196 SF

OPEN TO BELOW

OPEN TO BELOW OPEN TO BELOW

ROOF PLAN
A2.6
N
1 -

PLAN AT ROOF
3/64"=1'-0" @ 11x17 3/32"=1'-0" @ 24x368 0416
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 17 of 44 ends
Page 136 of 263 ends
Page 302 ends

10'-4" 3'-6"
89'-2"
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
ROOF
AVG. GRADE

PARAPET
5'-6"

STAIR ROOF
10'-4"10'-4"10'-4"10'-4"10'-4"10'-4"VARIES
LEVEL 8

BUILDING

ELEVATIONS
A3.1
1 -

EAST ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X36

METAL INFILL
PANEL

ALUMINUM

WINDOWS

DECORATIVE

METAL SCREEN
8 0416
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
(UNIVERSITY AVE.)

INSULATED METAL
PANELS

INSULATED METAL
PANELS
ATTACHMENT 2
ZAB 05-11-2023

Page 18 of 44 ends
Page 137 of 263 ends
Page 303 ends

10'-4" 3'-6"
89'-2"
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
ROOF
AVG. GRADE

PARAPET
5'-6"

STAIR ROOF
10'-4"10'-4"10'-4"10'-4"10'-4"VARIES
LEVEL 8
10'-4"

BUILDING

ELEVATIONS
A3.2
1 -

NORTH ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X368 0416
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING

INSULATED METAL
PANELS

METAL INFILL
PANEL

DECORATIVE

METAL SCREEN

ALUMINUM

WINDOWS

INSULATED METAL
PANELS
(CALIFORNIA ST.)
ATTACHMENT 2
ZAB 05-11-2023

Page 19 of 44 ends
Page 138 of 263 ends
Page 304 ends

10'-4" 3'-6"
89'-2"
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
ROOF
AVG. GRADE

PARAPET
5'-6"

STAIR ROOF
10'-4"10'-4"10'-4"10'-4"10'-4"10'-4"VARIES
LEVEL 8

BUILDING

ELEVATIONS
A3.3
1 -

WEST ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X36

METAL INFILL
PANEL
8 0416
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING

INSULATED METAL
PANELS

INSULATED METAL
PANELS

DECORATIVE

METAL SCREEN

ALUMINUM

WINDOWS
(UNIVERSITY AVE.)
ATTACHMENT 2
ZAB 05-11-2023

Page 20 of 44 ends
Page 139 of 263 ends
Page 305 ends

10'-4" 3'-6"
89'-2"
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
ROOF
AVG. GRADE

PARAPET
5'-6"

STAIR ROOF
10'-4"10'-4"10'-4"10'-4"10'-4"VARIES
LEVEL 8
10'-4"

BUILDING

ELEVATIONS
A3.4
1 -

SOUTH ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X36

METAL INFILL
PANEL
8 0416
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING

INSULATED METAL
PANELS

INSULATED METAL
PANELS

INSULATED METAL
PANELS

ALUMINUM

WINDOWS
ATTACHMENT 2
ZAB 05-11-2023

Page 21 of 44 ends
Page 140 of 263 ends
Page 306 ends

STREET STRIP

ELEVATIONS
A3.5
2 -
STREET STRIP ELEVATION @ UNIVERSITY AVE
1/32"=1'-0" @ 11X17 1/16" = 1'-0" @ 24X36
1 -
STREET STRIP ELEVATION @ CALIFORNIA ST
1/32"=1'-0" @ 11X17 1/16" = 1'-0" @ 24X36
0481632
0481632
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
2026 CALIFORNIA2022 CALIFORNIA2020 CALIFORNIA1598 UNIVERSITY (UNIVERSITY AVE.)
1597 UNIVERSITY
1600 UNIVERSITY
(CALIFORNIA ST.)
1598 UNIVERSITY
1548 UNIVERSITY1530 UNIVERSITY
ATTACHMENT 2
ZAB 05-11-2023

Page 22 of 44 ends
Page 141 of 263 ends
Page 307 ends

PHOTO CONTEXT
VIEWS
A3.6
1 -

CALIFORNIA LOOKING SOUTH - BEFORE
2 -

CALIFORNIA LOOKING SOUTH - AFTER
3 -

CALIFORNIA LOOKING NORTH - BEFORE
4 -

CALIFORNIA LOOKING NORTH - AFTER
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 23 of 44 ends
Page 142 of 263 ends
Page 308 ends

PHOTO CONTEXT
VIEWS
A3.7
1 -

UNIVERSITY LOOKING WEST - BEFORE
2 -

UNIVERSITY LOOKING WEST - AFTER
3 -

UNIVERSITY LOOKING EAST - BEFORE
4 -

UNIVERSITY LOOKING EAST - AFTER
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 24 of 44 ends
Page 143 of 263 ends
Page 309 ends

CONCEPTUAL

RENDERING
A3.8
1 -

PERSPECTIVE VIEW - UNIVERSITY LOOKING WEST
-
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 25 of 44 ends
Page 144 of 263 ends
Page 310 ends

CONCEPTUAL

RENDERING
A3.9
1 -

PERSPECTIVE VIEW - UNIVERSITY AND CALIFORNIA
-
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 26 of 44 ends
Page 145 of 263 ends
Page 311 ends

CONCEPTUAL

RENDERING
A3.10
1 -

SIDEWALK VIEW - CALIFORNIA AND UNIVERSITY
-
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 27 of 44 ends
Page 146 of 263 ends
Page 312 ends

CONCEPTUAL

RENDERING
A3.11
1 -

SIDEWALK VIEW - ACROSS UNIVERSITY
-
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 28 of 44 ends
Page 147 of 263 ends
Page 313 ends

CONCEPTUAL

RENDERING
A3.12
1 -

SIDEWALK VIEW - CAFE ENTANCE
-
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 29 of 44 ends
Page 148 of 263 ends
Page 314 ends

CONCEPTUAL

RENDERING
A3.13
1 -

PERSPECTIVE VIEW - CALIFORNIA LOOKING NORTHWEST
-
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 30 of 44 ends
Page 149 of 263 ends
Page 315 ends

GRADE AT UNIVERSITY

SIDEWALK
13'-4"

CALIFORNIA
74'-8" (BELOW HIGH-RISE)
CLUB
ROOM
10'-8"
PL
PL
RETAIL
MEZZ.

STAIRS
10'-4"
89'-2" AVG. GRADE TO PARAPET
10'-4" 10'-4" 10'-4" 10'-4" 10'-4"
3'-6"
1522 UNIVERSITY
23'-8"
8'-6" 8'-6"

BUILDING

SECTION
A4.1
1 -

BUILDING SECTION
3/64"=1'-0" @ 11X17 3/32" = 1'-0" @ 24X36
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 31 of 44 ends
Page 150 of 263 ends
Page 316 ends

UNIVERSITY
PL
1535 ADDISON1535 ADDISON
10'-4"
89'-2" AVG. GRADE TO PARAPET
10'-4" 10'-4" 10'-4" 10'-4" 10'-4"3'-6"23'-8"

BUILDING

SECTION
A4.2
1 -

BUILDING SECTION
3/64"=1'-0" @ 11X17 3/32" = 1'-0" @ 24X36
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING
ATTACHMENT 2
ZAB 05-11-2023

Page 32 of 44 ends
Page 151 of 263 ends
Page 317 ends

10'-4" 3'-6"
89'-2"
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
ROOF
AVG. GRADE

PARAPET
5'-6"

STAIR ROOF
10'-4"10'-4"10'-4"10'-4"10'-4"VARIES
LEVEL 8
10'-4"

MATERIAL
BOARD
MAT
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION

04.20.2023 DRC

05.11.2023 ZAB HEARING

METAL INFILL PANELINSULATED METAL
PANELS

INSULATED METAL
PANELS

INSULATED METAL
PANELS
1 -

NORTH ELEVATION
1/16"=1'-0" @ 11X17 1/8" = 1'-0" @ 24X368 0416

DECORATIVE

METAL SCREEN

METAL INFILL
PANEL

INSULATED METAL
PANELS

ALUMINUM

WINDOWS

INSULATED METAL
PANELS

DECORATIVE

METAL SCREEN
(CALIFORNIA ST.)

DECORATIVE

METAL SCREEN

DECORATIVE

METAL SCREEN
ATTACHMENT 2
ZAB 05-11-2023

Page 33 of 44 ends
Page 152 of 263 ends
Page 318 ends

MAIN ROOF
16,022 SQ. FT.
7TH LEVEL DECK
817 SQ. FT.
8TH LEVEL DECK
840 SQ. FT.
8TH LEVEL DECK
840 SQ. FT.

GROUND LEVEL GARDEN
9,404 SQ. FT.

GROUND LEVEL STORMWATER PLANTERS
1310 SQ. FT.

PRELIMINARY

STORMWATER

MANAGEMENT
PLAN
SW-1 1
-
STORMWATER MANAGEMENT DATA 2
-

PRELIMINARY STORMWATER MANAGEMENT PLAN
1/32"=1'-0" @ 11x17 1/16"=1'-0" @ 24x36
8 0416
N
1548-1598 University Ave
Berkeley, CA
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2030 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

01.21.2022 SB-330 APPLICATION

03.03.2022 DESIGN STUDIES

03.18.2022 REVISED BASE PLANS

04.01.2022 ZONING APPLICATION

07.20.2022 ZONING APPLICATION

09.06.2022 ZONING RESUBMISSION

10.28.2022 ZONING RESUBMISSION

12.19.2022 ZONING RESUBMISSION
202

12.23.2022 ZONING RESUBMISSION

03.16.2023 DRC HEARING SET

05.11.2023 ZAB HEARING SET
ATTACHMENT 2
ZAB 05-11-2023

Page 34 of 44 ends
Page 153 of 263 ends
Page 319 ends

Club room
Gym
Metal panels / screen
mounted to elevator shaft
Pockets of plantings seen from
club room and lobby
Manzanita
grove
Seating
Seatwall & dining
Dining
Fire pit & seating 'nook'
Raised planter / seating with groundcover below
Art / sculpture
Built-in seating
Projector / movie screen
'Pop-up' chaise lounges for cinema viewing
Large screening trees
Foundation planting
Koi pond or water feature
Vertical garden at elevator
shaft
Dominant courtyard tree-
Crape myrtle
Concrete steppers "float" on water surface
Paving material travels inside
out merging the two spaces
Manzanita
grove
Raised counter top seating with built-in BBQ
North 412 0
3/16"=1'-0"
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

07.15.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

05.11.2023 ZAB HEARING

COURTYARD CONCEPT

AND SITE FEATURES
L1.0

1. CONTRACTOR SHALL VERIFY ALL GRADES, EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO COMMENCING WORK. ALL DISCREPANCIES OR QUESTIONS SHALL BE BROUGHT TO THEATTENTION OF THE LANDSCAPE ARCHITECT FOR RESOLUTION. REDIRECT WORK TO AVOID DELAY.

2. ALL CURVES AND ALL TRANSITIONS BETWEEN CURVES AND STRAIGHT EDGES SHALL BE SMOOTH

3. TAKE ALL DIMENSIONS PERPENDICULAR TO ANY REFERENCE LINE, WORK LINE, FACE OF BUILDING, FACE OF WALL OR CENTERLINE.

4. S.A.D. FOR ALL INFORMATION ON WATERPROOFING, DRAINAGE & GRADING ON STRUCTURES.

SEE L2.1 FOR GENERAL PLANTING NOTES.

STREET TREE PROTECTION NOTES:

1. ALL TREE PROTECTION REQUIREMENTS AND RESTRICTIONS SHALL BE INCLUDED IN THE CONSTRUCTION NOTES AND PRINTED ON ALL COPIES OF THE PLANS. a)

INCLUDE THE NAME AND PHONE NUMBER OF THE PARTY THAT WILL MONITOR THE SITE AND ENSURE THE TREE PROTECTION MEASURES ARE BEING FOLLOWED; AND WHAT THE MONITORINGSCHEDULE WILL BE:

NAME / PHONE / SCHEDULE
b)
INSTALL 6 FOOT CHAIN-LINK FENCING TO PROTECT THE AREA WITHIN THE DRIP-LINE OF ANY PROTECTED TREE IN THE DEVELOPMENT AREA. FENCING SHALL BE MOUNTED TO POSTS THAT ARE DRIVENINTO THE GROUND. WHERE THIS IS NOT POSSIBLE BECAUSE OF EXISTING STRUCTURES, TREE ROOTS, OROTHER OBSTACLES, CHAIN-LINK PANELS MOUNTED TO STANCHIONS AND CONNECTED TO EACH OTHERMAY BE APPROVED. IN AREAS WHERE DIFFICULT TERRAIN MAKES THIS IMPRACTICAL, ORANGE CONSTRUCTION FENCING MAY BE APPROVED.
c)

ALL FENCING SHALL HAVE SIGNAGE STATING THE REQUIREMENTS AND RESTRICTIONS, AND THE CONTACT INFORMATION FOR THE PROJECT ARBORIST.
d)

WHEN ANY APPROVED CONSTRUCTION ACTIVITY WILL OCCUR WITHIN THE DRIP LINE OF A PROTECTED TREE THAT IS NOT SURROUNDED BY PROTECTIVE FENCING, THE TRUNK SHALL BE PROTECTEDBY WRAPPING IT WITH STRAW TUBES (WATTLE) OR VERTICAL WOOD SLATS (EX. 2X4), UP TO A MINIMUM OF 8 FEET FROM GRADE (SEE FIGURE 1, PAGE 6). SLATS SHALL BE ANGLED TO PROTECT THE ROOT FLARE ATTHE BASE OF THE TREE; AND CLOSED CELL FOAM OR EQUIVALENT MATERIAL SHALL BE USED TO PROTECTTHE TRUNK OF THE TREE WHERE IT CONTACTS THE SLATS. LATERAL BRANCHES BELOW 8 FEET SHALL ALSO BE PROTECTED. IN ADDITION, THE AREA SHALL BE COVERED WITH A 6 INCH LAYER OF MULCH TOPPEDWITH 3/4 INCH PLYWOOD THAT IS FASTENED TOGETHER. IF ANY LARGE OR MOTORIZED EQUIPMENT (MINIEXCAVATOR, BOBCAT, POWERED WHEELBARROW) WILL TRAVEL OVER THIS AREA, THE PLYWOOD MUST BEA MINIMUM OF 1 INCH AND ADEQUATE FOR THE WEIGHT OF THE EQUIPMENT THAT WILL TRAVEL OVER IT.IF LARGER EQUIPMENT (BACKHOE, TRACTOR) WILL BE USED, CONSULT THE CITY ARBORIST.CONSTRUCTION ACTIVITY REFERS TO ANY MOVEMENT OF PEOPLE, TOOLS, OR EQUIPMENT; OR STORAGEOF ANY TOOLS, EQUIPMENT, OR SUPPLIES. f)
LOCATE AND EXPOSE ANY ROOTS 2 INCHES IN DIAMETER OR GREATER THAT MAY NEED TO BE PRUNED TO FACILITATE THE PROJECT. THIS INCLUDES ANY TRENCHING THAT WILL BE DONE AS PART OFFOUNDATION OR UTILITY INSTALLATION. CONTACT THE CITY ARBORIST IN ADVANCE TO LESSEN THEAMOUNT OF TIME THAT THE ROOTS WILL BE EXPOSED. IF ROOTS MUST BE LEFT EXPOSED FOR MORE THAN THREE DAYS, CONSULT THE CITY ARBORIST.

NOTE:

THE 2 INCH DIAMETER THRESHOLD FOR ROOTS IS A
GUIDELINE THAT MAY BE ADJUSTED BY THE CITY ARBORIST DEPENDING ON THE SIZE AND CONDITION OFTHE TREE, AND THE LOCATION OF THE ROOTS. THE CITY ARBORIST MAY INCREASE THE TPZ, OR IMPOSEOTHER RESTRICTIONS, WHEN THE DRIPLINE OF A TREE HAS BEEN ALTERED BY PRUNING OR UNUSUALGROWTH PATTERNS. g)

NO STORAGE OF BUILDING MATERIALS, REFUSE, EXCAVATED SPOILS, OR DUMPING OF POISONOUS MATERIALS, IS PERMITTED WITHIN THE DRIP LINE OF ANY PROTECTED TREE. POISONOUS MATERIALSINCLUDE, BUT ARE NOT LIMITED TO, PAINT, PETROLEUM PRODUCTS, CONCRETE OR STUCCO MIX, DIRTYWATER, OR ANY OTHER MATERIAL WHICH MAY BE DELETERIOUS TO TREE HEALTH.STREET TREE PLANTING NOTES:

1. FOR NEW PLANTING:
a.

THE CITY ARBORIST SHALL BE NOTIFIED, BY CALLING (510) 981-6660, PRIOR TO THE DELIVERY OF THETREES FOR INSPECTION OF THEIR SIZE AND STRUCTURE. b.

EACH TREE SHALL BE PROPERLY PLANTED AT OR JUST BELOW GRADE (<1").

SOIL AMENDMENT IS
NOT RECOMMENDED. NO CONSTRUCTION RUBBLE OR NON-ORGANIC MATERIAL SHALL BE WITHIN THETREE WELL. c.

THE SURROUNDING SOIL OUTSIDE THE CONTAINER (ROOT BALL) SHOULD BE LIGHTLYCOMPACTED TO ABOUT 4 INCHES BELOW GRADE WITH THE ROOT BALL HIGHER THAN THAT. d.
2 TO 2.5 INCHES OF BASE ROCK SHOULD BE APPLIED AROUND THE ROOT BALL LEAVING 1.5 TO 2 INCHES LEFT FOR THE MATERIAL.
e.
15G CONTAINERS ARE APPROXIMATELY 15-16 INCHES IN DIAMETER AND THE MATERIALSHOULD BE APPLIED TO THE APPROXIMATE EDGE OF THE ROOT BALL WITH THE TOP GRADE OFTHE ROOT BALL UP TO 1 INCH BELOW THE TOP OF THE MATERIAL THAT WILL BE APPLIED. f.

EACH NEW TREE SHALL HAVE AUTOMATIC IRRIGATION INCLUDING TWO TREE BUBBLERS THATCURVE OVER THE TOP OF THE TREES' ROOT BALL AND PROVIDE A MINIMUM OF 20 GALLONS PERWEEK BETWEEN MARCH 15 AND OCTOBER 15 FOR THE FIRST THREE YEARS. LARGER TREES MAYREQUIRE ADDITIONAL BUBBLERS.

THE BUBBLERS SHOULD BE LOCATED ON TOP OF THE ROOT
BALL WITHIN THIS 15-16 INCH CIRCLE AND NOT BE COVERED
WITH MATERIAL.
g.

TREES THAT DIE WITHIN THE FIRST THREE YEARS MUST BE REPLACED AT THE PROPERTY OWNER'S EXPENSE.

LANDSCAPE SHEET INDEX
NOTES

CITY OF BERKELEY

DESIGN REVIEW COMMITTEE
HEARING SET 04.20.2023
L1.0 Courtyard Concept and Site Features
L2.0 Landscape Plan at Streetscape
L2.1 Courtyard Landscape Site Plan; Plant List
L3.0 Courtyard Site Improvements Imagery
L3.1 Courtyard Planting Imagery
L3.2 Screening Tree Options
I1.0 Irrigation Plan
I2.0 Irrigation Notes, Legend, Schedules & Calcs.

I2.1 Irrigation Details
I2.2 Irrigation Details
ATTACHMENT 2
ZAB 05-11-2023

Page 35 of 44 ends
Page 154 of 263 ends
Page 320 ends

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal

U N IV E R S I T Y A V E N E U E

C A L I F O R N I A S T R E E T

FOR COURTYARD AREA,

SEE ENLARGEMENT ON
SHEET L2.1 FOR DETAILED

INFORMATION
4' WIDE

CONCRETE

ACCESS PATH

REMOVE & REPLACE (E) STREET TREES
EXISTING CRAPE MYRTLES (5) TO REMAIN &

BE PROTECTED (EXPAND TREE WELLS

PER ARBORIST RECOMMENDATION)
TREE WELLS FILLED WITH FLEXI-PAVE, TYP.
3' X 3' SCORING

PATTERN PER

CITY STANDARDS
8' PLANTING AREA

ACCOMMODATES

LARGE SCREENING

TREES, SPECIES TBD
PROPOSED STREET TREE AT UNIVERSITY AVE:
-EMERALD SUNSHINE ELM
(Ulmus davidiana var. japonica ‘Emerald Sunshine’)
North
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

07.15.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

05.11.2023 ZAB HEARING

LANDSCAPE PLAN

AT STREETSCAPE
L2.0 0 4 8 16
NOTES:

1. SEE L1.0 FOR STREET TREE PROTECTION AND PLANTING NOTES.

2. PROPOSED STREET TREE SPECIES, LOCATION, AND CONDITIONS SUBJECT TO ONGOING REVIEW AND APPROVAL BY THE CITY OF BERKELEY'S MANAGING CONSULTING URBAN FORESTER AND ARBORIST. PROPOSED STREET TREES ARE CURRENT WITH EXISTING UTILITIES AS OF 03.01.2023 AND WILL BE SUBJECT TO ADDITIONAL REVIEW AFTER PROPOSED UTILITIES ARE FINALIZED.

SEE L1.0 AND L2.1 FOR COURTYARD
ATTACHMENT 2
ZAB 05-11-2023

Page 36 of 44 ends
Page 155 of 263 ends
Page 321 ends

1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

07.15.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

05.11.2023 ZAB HEARING

COURTYARD

LANDSCAPE SITE PLAN
L2.1
North 412 0
3/16"=1'-0"
Note: all landscape lighting will comply with the City of Berkeley Dark Skies ordinance and Bird Safe requirements.

GENERAL PLANTING NOTES

6. SOIL PREPARATION: The Landscape Contractor shall be
responsible for finish grading and all planting area drainage.

Positive drainage away from the building as per city codes shall be maintained. No low spots which hold standing water will be accepted.

The Landscape Contractor shall incorporate soil preparation amendment into planting areas as noted below. Where roto-tilling is not possible, incorporate soil amendments into top 6 Inches with hand tools. After installation of irrigation system, all planting areas are to be fine graded to within 2 inches and slightly mounded away from edges of top of planter, curb, walk, header, etc. and raked smooth with all rocks and debris over 1-inch in diameter removed.

7. SOIL PREPARATION AMENDMENTS AND BACKFILL
MIX: The Landscape Contractor shall amend existing soil per the soils report.

8. TREE PLANTING: Trees shall be planted per detail on plan.

Trees shall typically be located a minimum of 3 1/2 feet from curbs, walks, headers, buildings, and overhead structures within the project. Backfill per soils report. Thoroughly water trees immediately after planting.

9. SHRUB PLANTING: The shrubs shall be spotted as per
plan, spotted at the shown locations, and approved by Landscape Architect prior to the digging of the holes. Shrub backfill shall be per soils report. Thoroughly water shrubs immediately after planting. Do not plant any shrub within 2 feet of any building wall.

10. MAINTENANCE: The Contractor shall maintain the project for 90 days (or as requested by owner) following the approval to begin the maintenance period. During the entire maintenance period, watering, cultivating, weeding, mowing, repair/tightening of stakes and ties, restoration of basins, provision of supplemental water by hand in addition to irrigation system is required as necessary. No pre-emergence herbicides shall be applied - hand remove weeds. Only organic fertilizers shall be applied such as those specified. Install per manufacturer's recommendations. At the end of the 90 day maintenance period all areas are to be weed free and all plant material shall be in a healthy, thriving condition.

Integrated pest management practices shall be implemented.

11. SUBSTITUTIONS: Requests for plant substitutions shall be made to the Landscape Architect within 15 days after signing of contract.

12. GUARANTEE: All construction, trees and shrubs by the Landscape Contractor and/or subcontractors shall be guaranteed for (1) one year after start of maintenance period. The contractor shall replace, at no expense to the Owner, any and all landscape materials that are in an unacceptable condition for time of use, and trees or shrubs that are dead or not in a vigorous, healthy growing condition, within two weeks of notification of such condition.

Replacement shall be of the same kind and size as the originally specified item and shall be replaced as originally described on the drawings. The Contractor shall not be held liable for loss of plant materials during the guarantee period due to vandalism, accidental causes or acts of neglect by others than the Contractor, his agents and employees.

13. CLEAN UP: At the end of each work day, at the inspection for substantial completion, and before acceptance of project - clean paved areas that are dirtied or stained by construction operations by sweeping or washing, and remove defacements and stains.

Remove construction equipment, excess materials and tools. Haul from Owners property any debris resulting from construction, and dispose of it legally. Remove remaining temporary protection at time of acceptance by Owner unless otherwise agreed.

14. FERTILIZERS: Available from California Organic Fertilizers, Inc. 1-800-269-5690 www.organicag.com.

TOTAL HARDSCAPE = 4,602 SF
TOTAL LANDSCAPE AREA = 4,537 SF
TOTAL LANDSCAPE % = (4,537 / 9,165) * 100
TOTAL USEABLE AREA = 9,165 SF
TOTAL LANDSCAPE % = 50%
ATTACHMENT 2
ZAB 05-11-2023

Page 37 of 44 ends
Page 156 of 263 ends
Page 322 ends

1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

07.15.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

05.11.2023 ZAB HEARING

COURTYARD

SITE IMPROVEMENTS

IMAGERY
L3.0
Emerald Sunshine Elm (Ulmus davidiana var. japonica ‘Emerald Sunshine’) ATTACHMENT 2
ZAB 05-11-2023

Page 38 of 44 ends
Page 157 of 263 ends
Page 323 ends

1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

07.15.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

05.11.2023 ZAB HEARING

COURTYARD

PLANTING IMAGERY
L3.1
ATTACHMENT 2
ZAB 05-11-2023

Page 39 of 44 ends
Page 158 of 263 ends
Page 324 ends

1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

07.15.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

05.11.2023 ZAB HEARING

SCREENING TREE

OPTIONS
L3.2
Canary Island Pine (Pinus canariensis)
·Mature size:50-80 ft tall / 20-35 ft wide
·Growth rate:Fast
·Water use:Low
·For 1598 University: Space at 12 ft apart on center
California Incense Cedar (Calocedrus decurrens)
Mature size:75-90 ft tall / 10-15 ft wide
·Growth rate:Moderate
·Water use:Moderate
·For 1598 University: Space at 8 ft apart on center
Italian Cypress (Cupressus sempervirens)
Mature size:40-60 ft tall / 5-10 ft wide
·Growth rate:Moderate
·Water use:Low
·For 1598 University: Space at 5 ft apart on center
Coast Redwood (Sequoia sempervirens)
·Mature size:70-100 ft tall / 20-30 ft wide
·Growth rate:Very fast
·Water use:High
·For 1598 University: Space 10 ft apart on center
ATTACHMENT 2
ZAB 05-11-2023

Page 40 of 44 ends
Page 159 of 263 ends
Page 325 ends

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"

PARKLIFT
8'-10 3/8"
X 18'-3"
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
3 CY
BIN
96 gal
96 gal

WEATHER SENSOR - SEE
LEGEND FOR SPEC.

OUTDOOR SMART CONTROLLER

IN ELECTRICAL ROOM
- SEE LEGEND
FOR SPEC.
1"
2 9.0
A
M
1799 SF
1"
7 1.5
A
L
307 SF
1"
8 7.0
A
L
7 SF
1"
3 12.0
A
L
12 SF
1-1/2"
1-1/2" 1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1"
3/4"
1"
1-1/4"
1"
1"
6 1.4
A
L
270 SF
3/4"
1"
4 10.8
A
M
2160 SF
1"
1 10.0
A
L
10 SF
1"
1"
5 10.0
A
L
10 SF
1"
North
1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

05.11.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

IRRIGATION
PLAN
I1.0 0 5' 10' 20'
ATTACHMENT 2
ZAB 05-11-2023

Page 41 of 44 ends
Page 160 of 263 ends
Page 326 ends

1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

05.11.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

IRRIGATION

NOTES, LEGEND,
SCHEDULES & CALCS.

I2.0
SYMBOL MFG. MODEL NO. DESCRIPTION RAD GPM PSI PR

IRRIGATION LEGEND
(2) RZWS-36-50-CVHUNTERROOT ZONE WATERING SYSTEM0.50 (1.0) 0.701'30

DRIP IRRIGATION NOTES
HUNTERDRIP LINE SYSTEM HDL-06-18-500-CV0.5
Per 100 S.F.
30 0.43 18"
(SPACE DRIPLINES 18" O.C.)

AT THE EXHAUST HEADER OF DRIP SYSTEM, THE CONTRACTOR SHALL INSTALL HUNTER PLD-BV FLUSH

VALVE W/ BALL VALVE AND A HUNTER ECO-INDICATOR AT EACH DRIP SYSTEM AT OPTIMAL FURTHEST POINT FROM CONTROL ZONE KIT (SEE DETAILS).

HUNTERDRIP LINE SYSTEM HDL-06-18-500-CV0.5
Per 100 S.F.
30 0.43 18"
(SPACE DRIPLINES 18" O.C.)

THE CONTRACTOR WILL NEED TO FIELD LOCATE HUNTER PLD-ARV AIR RELIEF VALVE KIT (SEE DETAIL) AT

THE HIGHEST LOCATIONS ON EACH DRIP LINE SYSTEM
HUNTERDRIP LINE SYSTEM HDL-06-18-500-CV0.5
Per 100 S.F.
30 0.43 18"
(SPACE DRIPLINES 18" O.C.)
- PROVIDE SLEEVES UNDER ALL PAVING.

PVC SCH 40 MAIN AND LATERAL LINE SLEEVE 2x DIA. OF PIPE ENCASED.

MAINLINE - INSTALL 18" COVER IN PLANTING AREAS,
24" COVER UNDER PAVING - SIZES INDICATED.

NIBCO T-580 BALL VALVE - LINE SIZE.

Mainlines (pressurized) 1 1/2 inch and smaller shall be Schedule 40 solvent-weld P.V.C..

Mainlines (pressurized) 2 inch through 3 inch shall be Class 315 solvent-weld P.V.C., with thrust blocks per detail.

PVC SCH. 40 LATERAL LINE- 12" COVER IN PLANTING AREAS,
24" COVER UNDER PAVING. - SIZES INDICATED.

POTABLE LATERAL LINE

INDICATES VALVE SIZE

INDICATES STATION NUMBER

INDICATES GPM

INDICATES CONTROLLER

INDICATES HYDROZONE
INDICATES STATION S.F.

NOTE:SEE IRRIGATION SYSTEM

INFORMATION FOR INDIVIDUAL

VALVE PRECIPITATION RATES

AND OPERATING PSI AS
REQUIRED BY CODE.

HUNTER ICZ-101-40 1" CONTROL ZONE KIT WITH PVC BALL VALVE FOR FLOW 2.0 TO 20 GPM.

HUNTER ICV-101G-FS-AS-ADJ SERIES REMOTE CONTROL VALVE - SIZE INDICATED.

HUNTER, QUICK COUPLER, HQ-22DLRC WITH LOCKING CAP.

I HAVE COMPLIED WITH THE CRITERIA OF THE MODEL WATER EFFICIENT

LANDSCAPE ORDINANCE AND HAVE APPLIED THEM FOR THE EFFICIENT USE OF WATER IN THE IRRIGATION DESIGN PLAN.

COMPLIANCE STATEMENT

JOHN PENNELL PHILLIPSDATE
04-13-2023

WATER METER BY OTHERS
1 1/2" HUNTER IBC-151G-FS NORMALLY CLOSED MASTER VALVE - RELAY TO CONTROLLER 1" WILKINS 375XL BACKFLOW PREVENTER W/ 1" SXL WYE STRAINER LOCATED IN V.I.T. STRONGBOX SBBC-30SS

STAINLESS STEEL ENCLOSURE OR EQUAL
1" HUNTER FCT-100 FLOW SENSOR IN PVC HOUSING - RELAY TO CONTROLLER.

AUTOMATIC CONTROLLER LOCATION - SEE NOTE ON THIS SHEET

WEATHER SENSOR LOCATION - SEE NOTE ON THIS SHEET

POINT OF CONNECTION NOTE
AVAILABLE PRESSURE:

MAXIMUM DEMAND:

DESIGN PRESSURE:

66.0 PSI (ASSUMED)

59.8 PSI

12.0 GPM
CONTRACTOR TO LOCATE A WATER METER. INSTALL A REDUCED BACKFLOW PREVENTER, A MASTER VALVE AND A FLOW SENSOR AT THE APPROXIMATE LOCATION AS SHOWN. ALL POC APPURTENANCE MUST BE INSTALLED IN PLANTING AREA.

COORDINATE THESE LOCATIONS WITH OWNER/DEVELOPER. CONTRACTOR TO RELAY MASTER VALVE & FLOW SENSOR TO CONTROLLER.

CONTRACTOR TO INSTALL A (12) STATION HUNTER IC-600-M INTERIOR CONTROLLER W/ (1) ICM-600 MODULES IN METAL WALL MOUNT LOCATED IN THE ELECTRICAL ROOM. CONTRACTOR TO INSTALL AN HUNTER WSS-SEN WIRELESS SOLAR SYNC LOCATED DIRECTLY ABOVE CONTROLLER AND ATTACHED TO TOP STORY ROOF EAVE OR GUTTER PER MFG. SPECS. IN AN AREA FREE OF OVERHEAD OBSTRUCTIONS. IRRIGATION SYSTEMS ARE DESIGNED TO OPERATE AT A MAXIMUM OF 12.0 GPM.

CONTRACTOR TO PULL 24V WIRES AND CONNECT TO A MASTER VALVE, FLOW SENSOR AND REMOTE CONTROL VALVES AT THE APPROPRIATE LOCATIONS AS SHOWN AS REQUIRED. CONTRACTOR TO PROVIDE 120V CONTINUOUS POWER TO THE CONTROLLER. COORDINATE THESE LOCATIONS WITH OWNER/ DEVELOPER AND SHALL BE LOCATED WITHIN 800' AWAY FROM FLOW SENSOR.

CONTROLLER NOTE
MUST BE OVERSIZED LEAVING AMPLE ROOM FOR FUTURE WIRE ADDITIONS OR REPAIRS.

PVC SCH 40 WIRE SLEEVE - SIZE TO BE MIN. 2" AND DETERMINED BY THE CONTRACTOR. - PROVIDE SLEEVES UNDER ALL PAVING.

IRRIGATION NOTES
INSTALL ALL HEADS A MINIMUM OF 18" AWAY FROM BUILDING WALLS & A MINIMUM THIS SYSTEM IS DIAGRAMMATIC. ALL PIPE, VALVES, ETC. SHOWN WITHIN PAVED

AREAS ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN

THE IRRIGATION CONTRACTOR SHALL FLUSH AND ADJUST ALL SPRINKLER HEADS

FOR OPTIMUM PERFORMANCE AND PREVENT OVERSPRAY ONTO WALKS AND ROADWAYS AS MUCH AS POSSIBLE. THIS SHALL INCLUDE SELECTING THE BEST

INSTALL ALL HEADS WITH DOUBLE OR TRIPLE SWING JOINTS, USING STREET ELLS,

DO NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS INDICATED ON THE

DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT UNKNOWN OBSTRUCTIONS OR

GRADE DIFFERENCES EXIST AND SHOULD BE BROUGHT TO THE ATTENTION OF THE

NOT PERFORMED, THE CONTRACTOR MUST ASSUME FULL RESPONSIBILITY FOR ANY

THE SPRINKLER SYSTEM DESIGN IS BASED ON A MINIMUM OPERATIONAL PRESSURE AND A MAXIMUM DEMAND AT THE POINT OF CONNECTION, AS NOTED ON THE PLAN.

BEFORE INSTALLING THE SYSTEM, CHECK POINT OF CONNECTION AND IMMEDIATELY

NOTIFY CONTRACTING OFFICER IF PRESSURE IS NOT AS NOTED OR THE REQUIRED ALL MAINLINE UNDER PAVING SHALL BE INSTALLED 24" DEEP. ALL LATERAL LINES

THE IRRIGATION CONTRACTOR IS TO ADJUST HEAD LOCATIONS IN THE FIELD IN ORDER TO GUARANTEE 100% COVERAGE. CONTRACTOR TO CONTACT THE

CONTRACTING OFFICER PRIOR TO ANY MAJOR CHANGE(S) RESULTING IN

INSTALL NECESSARY CHECK VALVE IN HEADS THAT EXHIBIT TENDENCIES FOR LOW

PRESSURE COMPENSATING SCREENS WHEN RADIUS IS REDUCED MORE THAN FIFTY DEGREE OF ARC TO FIT THE EXISTING SITE CONDITIONS. CONTRACTOR TO USE GALLONS PER MINUTE IS NOT AVAILABLE.

WATER LINE UNDER PAVING

SYSTEM COVERAGE
ADDITIONAL COST TO THE OWNER.

UNDER PAVING SHALL BE SCH 40 PVC AND INSTALLED 24" DEEP.

OF 12" AWAY FROM ALL STUCCO SURFACES.

DIAGRAMMATIC PLAN

SPRINKLER ADJUSTMENT REQUIRED
PLANTING AREAS AND JOINT TRENCHES WHEREVER POSSIBLE.

REVISIONS REQUIRED.

HEAD DRAINAGE.

FIELD CONDITIONS
CONTRACTING OFFICER. IN THE EVENT THAT THIS NOTIFICATION IS

MINIMUM PRESSURE AND MAXIMUM GALLONS REQUIRED

SWING JOINTS
AS PER DETAIL.

PERCENT (50%).

Irrigation System Maintenance Procedures
While the system is deigned to operate automatically, a regular maintenance schedule is necessary to prevent and address failures in the system as well as ensure that the system operates in a manner that meets or exceeds the MAWA values provided.

Any broken or malfunctioning irrigation system components should be replaced with the same components, or an equal or superior equivalent.

Upon completion of the project, the following measures should be performed by property management at intervals noted below:

Weekly:

During weekly landscape maintenance operations, the maintenance personnel should look for signs of runoff, erosion, and plant die off due to irrigation system failures. If issues are detected, they should be brought to the attention of the maintenance supervisor and property management for timely correction.

All overhead spray heads shall be inspected to ensure clear operation and in order to identify and repair any damaged equipment.

Monthly:

All irrigation and master valves shall be visually inspected by a property management representative while the valve is under operating conditions. All control valves and filters should be visually inspected and cleaned as required and in accordance with manufactures specifications. All leaks shall be promptly reported to a landscape maintenance representative so that the valve may be repaired or replaced in a timely fashion with the minimum amount of leaking water exposed to open air.

All Root Watering Systems are to be visually inspected to insure that all locking grates are being reasonably kept free of debris. All grates that are not kept reasonably free of debris are to be reported to a landscape maintenance representative. All Root Watering Systems that have their locking grates damaged or missing are to be reported to a landscape maintenance representative so that the locking grate may be repaired or replaced in a timely fashion.

MAINTENANCE LOG
Keep a log of all inspections and maintenance performance on the irrigation system (Updated copy to be provided to Property Manager on a monthly basis) Overall Landscape Maintenance Procedures
At a minimum, the following items should be addressed on a regular basis as required per city code:

Weekly
Pruning, weeding and maintenance of turf areas should be done on a weekly basis Monthly
Dead, dying and diseased vegetation should be replaced with equivalent plant material w/ similar hydrozone requirements, provided that the replaced vegetation does not result in mixing higher water use plants with low water use plants in the same hydrozone.

Invasive plant species should be eradicated as required.

Plant material should be maintained in order to avoid obstruction of motorists views.

Annually
Mulch should be replenished in order to maintain appropriate soil moisture levels.

Soil amendments consistent with the agronomic soils report for this project should be applied in the manner prescribed in order to support and maintain healthy plant growth.

Lawns should be fertilized in a manner consistent with best management practices

IRRIGATION CALCULATIONS & SCHEDULES
in contractor being responsible for changes that might occur. to notify Owner for instructions. Failure to do so will result prior to installation. If different from PSI noted above, Contractor Contractor shall verify the static water pressure with supplier

PRESSURE LOSS CALCULATIONS - POC 'A'

RESIDUAL PRESSURE REMAINING
AVAILABLE PRESSURE (P.O.C.)
BACKFLOW PREVENTER (1")

LATERAL LINE

ELEVATION CHANGE

TOTAL PRESSURE LOSS
VALVE
VALVE #
BALL VALVES (1 1/2")
WATER METER (3/4" - ASSUMED)
GPM

66.0 (ASSUMED)
+6.2 (10.4%)

0.0 (UP GRADE 0')

29.8 12.0

3.0 (5.0 MAX.)
'A3'

12.0 GPM

2.6 1.0
MASTER VALVE (1 1/2")1.5
FLOW METER (1")1.0
FITTING LOSS (10%)2.7
MINIMUM OPERATING PRESSURE30
DESIGN PRESSURE REQUIRED59.8
(185' @ 1 1/2") MAINLINE1.0

FOR THE ESTABLISHMENT PERIOD, THE CONTRACTOR IS TO SELECT THE APPROPRIATE 90 DAY PERIOD (I.E. MAY,JUNE,JULY) FROM THE ANNUAL SCHEDULE PROVIDED NOTE:
(SPACE DRIPLINES 18" O.C.)
HUNTERDRIP LINE SYSTEM HDL-06-18-500-CV0.5
Per 100 S.F.
30 0.43 18"
(SPACE DRIPLINES 18" O.C.)
ATTACHMENT 2
ZAB 05-11-2023

Page 42 of 44 ends
Page 161 of 263 ends
Page 327 ends

1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

05.11.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

IRRIGATION

DETAILS
I2.1
A. AUTOMATIC CONTROLLER
B. BACKFLOW PREVENTER
C. MASTER VALVE
D. FLOW SENSOR
E. TYPICAL TRENCHING
F. TYPICAL SLEEVING
G. BALL VALVE
H. VALVE BOX INSTALLATION
I. WIRE CONNECTOR

1. STRIP WIRES 1/2" TO 5/8". USING

LINEMANS PLIERS OR OTHER STYLE
TOOL, TWIST ENDS TOGETHER MIN 3
TIMES. INSERT INTO SCOTCHLOK

ELECTRICAL CONNECTOR AND ROTATE

CLOCKWISE UNTIL ADDITIONAL
FORCE IS REQUIRED.

2. INSERT THE SPLICE INTO THE
GEL-FILLED INSULATOR TUBE.

PUSH PAST THE LOCKING

FINGERS TO HOLD THE SCOTHLOK
CONNECTOR IN PLACE.

3. POSITION WIRE CHANNELS AND

SNAP INSULATOR TUBE COVER
CLOSED.
* WIRE CONNECTORS TO BE DBR/Y-6 BY 3M

OR EQUAL

WIRE SPLICE STEPS
J. RAIN SENSOR
ATTACHMENT 2
ZAB 05-11-2023

Page 43 of 44 ends
Page 162 of 263 ends
Page 328 ends

1598

UNIVERSITY

ALL DRAWINGS AND WRITTEN MATERIAL APPEARING

HEREIN CONSTITUTE ORIGINAL AND UNPUBLISHED

WORK OF THE ARCHITECT AND MAY NOT BE

DUPLICATED, USED OR DISCLOSED WITHOUT WRITTEN
CONSENT OF TRACHTENBERG ARCHITECTS.
2104 JOB:

SHEET:
2421 Fourth Street
Berkeley, California 94710
510.649.1414
www.TrachtenbergArch.com

TRACHTENBERG

ARCHITECTS

05.11.2022 PROGRESS PLANS
1598 University Ave
Berkeley, CA

OUT INSIDEO
landscape architecture
6000 Harwood Ave
Oakland CA 94618
www.aboutinsideout.com

04.20.2023 DRC HEARING

IRRIGATION

DETAILS
I2.2
A. QUICK COUPLER
B. REMOTE CONTROL VALVE
C. CONROL ZONE KIT
D. DRIP LINE LAYOUT
E. FLUSH VALVE ASSEMBLY
F. SURSURFACE DRIP LINE
G. PRESSURE INDICATOR
H. AIR RELIEF VALVE
J. ROOT ZONE WATERING SYSTEM
LEGEND
1 2
3 4
5 1
2 LEGEND:

BALL VALVE
3 FINISHED GRADE

IRRIGATION HOSE (LENGTH AS NECESSARY)
4 FILTER FABRIC
5 BRICK
1 2
3 4
5 1
2 LEGEND:

PRESSURE INDICATOR
3 4 PVC LATERAL PIPE

FINISHED GRADE

ADJACENT MULCH
5 SWING JOINT
ATTACHMENT 2
ZAB 05-11-2023

Page 44 of 44 ends
Page 163 of 263 ends
Page 329 ends

Z ONIN G

A D J U S T M E N T S

B OAR D
M e m o r a n d u m
1947 Center Street, Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.7474 Fax: 510.981.7420 E-mail: [email protected]

FOR BOARD ACTION
MAY 11, 2023
1598 University Avenue
Use Permit #ZP2022-0099 to demolish a non-residential structure and construct a 127,492 square-foot, eight-story (89 feet- 2 inches) mixed-use residential building containing 207 dwelling units (21 Very Low-Income) and 5,943 square foot commercial space, with 39 automobile parking spaces and 92 bicycle parking spaces, utilizing State Density Bonus RE: Changes to Conditions of Approval related to Affordable Hosuing Provisions and Street Trees
New SB 330 Preliminary Development Project Vesting Date On May 2, 2023, the project applicant contacted staff to submit a new SB 330 preliminary development project application, superseding the preliminary housing development project application submitted in January 2022. The new preliminary application presents a project that is the same as the project before ZAB. The number of units or the size of the project has not changed. Staff invoiced the applicant for the new preliminary application, and the invoice was paid on May 5, 2023. Submittal of all the information listed in the pre-app form and payment of the permit processing fee freezes fees and development standards as of May 5, 2023, unless exceptions per Government Code § 65889.5(o) are triggered.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 1 of 75 ends

Attachment 4

Page 164 of 263 ends
Page 330 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 2 of 5

Table 3: Project Chronology
Date Action
January 26, 2022 SB 330 complete preliminary housing development project application submitted
July 7, 2022 SB 330 Use Permit Application submitted
August 24, 2022 Application deemed incomplete
September 22, 2022 Application resubmitted
October 20, 2022 Application deemed incomplete
November 1, 2022 Application resubmitted
December 1, 2022 Application deemed incomplete
December 23, 2022 Application resubmitted
January 23, 2023 Application deemed complete
February 2, 2023 LPC hearing
April 20, 2023 DRC hearing
May 3, 2023 Plans Resubmitted
May 4, 2023 Public hearing notices mailed/posted
May 5, 2023 SB 330 complete preliminary housing development project application submitted (supersedes previous)
May 11, 2023 ZAB hearing

The new vesting date affects the affordable housing mitigation fee and inclusionary housing requirements, Berkeley Municipal Code (BMC) 22.20.065 and 23.328, respectively. The Findings and Conditions will be revised to remove reference to BMC 22.20.065, which was repealed. The affordable housing conditions will be revised to require full compliance with all applicable provisions of BMC Chapter 23.328, Inclusionary Housing, and Council Resolution 70,698 (both are attached to this memo), which include elements such as a regulatory agreement, income requirements, approval of a final Affordable Housing Compliance Plan prior to issuance of a building permit, and timing of any required in-lieu payments.

BELOW MARKET RATE UNITS

1. Affordable Housing Mitigation Fee (AHMF) : Consistent with BMC 22.20 .065 and fee resolution No. 68,074 -N.S., the applicant shall provide a schedule, consistent with a schedule approved by the City Manager or her designee, outlining the timeframe for payment of the AHMF, or provide an alternative to the fee payment as permitted by the BMC. Payment of the AHMF may be reduced if paid prior to the building permit per resolution No. 68,074 -N.S., and shall be paid no later than prior to the issuance of a certificate of occupancy for the project.

2. Number of Below Market Rate Units. The project shall provide 17 (Very Low -Income) below market rate rental dwelling units (“BMR Units”), which are required to comply with the State Density Bonus Law (Government Code Section 65915). The BMR Units shall be designated in the Regulatory Agreement and shall be reasonably dispersed throughout the project; be of the same size and contain, on average, the same number SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 2 of 75 ends
Page 165 of 263 ends
Page 331 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 3 of 5

of bedrooms as the non-BMR units in the project; and be comparable with the design or use of non -BMR units in terms of appearan ce, materials and finish quality . The designation of BMR Units shall conform to the addresses assigned to the building by the City.

3. Regulatory Agreement. Prior to the issuance of a building permit, the applicant shall enter into a Regulatory Agreement tha t implements Government Code Section 65915 and this Use Permit. The Regulatory Agreement may include any terms and affordability standards determined by the City to be necessary to ensure such compliance. The maximum qualifying household income for the BM R Units shall be 50 percent of area median income (AMI), and the maximum housing payment shall be 30 percent of 50 percent of AMI, as set forth in the following paragraphs of this condition. If the BMR units are occupied by very low-income tenants receiving a rental subsidy through the Section 8 or Shelter Plus Care programs, the rent received by the project sponsor may exceed the restricted rent to the payment standards allowed under those programs so long as the rent allowed under the payment standards is not greater than the market rents charged for comparable units in the development. The applicant shall submit the Regulatory Agreement to the Housing and Community Services Department (HHCS) via email to [email protected] for review and approval.

4. Affordable Housing: Below Market Rate Program. In addition, the following provisions shall apply:

A. Maximum rent shall be adjusted for the family size appropriate for the unit pursuant to California Health & Safety Code Section 50052.5 (h).

B. Rent shall include a reasonable allowance for utilities, as published and updated by the Berkeley Housing Authority, including garbage collection, sewer, water, electricity, gas, and other heating, cooking and refrigeration fuels. Such allowance shall take into account the cost of an adequate level of service. Utilities do not include telephone service. Rent also includes any separately charged fees or service charges assessed by the lessor which are required of all tenants, other than security deposits.

C. BMR units will be provided for the life of the project under Section 22.20.065.

5. Determination of Area Median Income (AMI).
• The “AMI” (Area Median I ncome) shall be based on the income standards for the Oakland Primary Metropolitan Statistical Area reported by the United States Department of Housing and Urban Development (HUD). In the event HUD discontinues establishing such income standards, AMI shal l be based on income standards determined by the California State Department of Housing and Community Development (HCD). If such income standards are no longer in existence, the City will designate another appropriate source or method for determining the median household income.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 3 of 75 ends
Page 166 of 263 ends
Page 332 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 4 of 5

• The applicable AMI for the purpose of determining the allowable rent for each unit (but not for the purpose of determining eligibility for occupancy of an inclusionary unit) shall be determined in accordance with the following table:

U n i t
S i z e
AMI Standard
Studio unit AMI for a one-person household
One-bedroom unit AMI for a two-person household
Two-bedroom unit AMI for a three-person household
Three-bedroom unit AMI for a four-person household

6. Nothing in these conditions shall be interpreted to prohibit, or to require modification of the Use Permit or Regulatory Agreement to allow, the provision of additional BMR units, or additional affordability, than are required in the foregoing provisions.

7. Affordable Housing. Nothing in conditions 24 -32 shall be interprete d to prohibit, or to require modification of the Use Permit or Regulatory Agreement to allow, the provision of additional BMR units, or additional affordability, then are required in the foregoing provisions.

8. Affordable Housing. Dwellings that are approv ed as rental units, but in which a condo map is approved prior to issuance of an occupancy permit, shall be subject to the affordability requirements within BMC 23.328.

A. Residential housing projects for the construction of five or more Dwelling Units; B. Residential housing projects for the construction of one to four new Dwelling Units, when such Units are added to an existing one to four -unit property, which has been developed after August 14, 1986, and the resulting number of units totals five or more. All Units in such a property are subject to the requirements of this chapter;
C. Residential housing projects proposed on lots whose size and zoning designation is such to
allow construction of five or more Dwelling Units.

9. Affordable Housing – Density Bonus. If a density bonus was granted for the project, the regulatory agreement shall reflect the number of qualifying units set forth in Section 65915(f)(4) that are needed to support the bonus that was granted. s
Affordable Housing Requirements

10. Project shall comply with BMC Chapter 23.328 Inclusionary Housing, effective April 1, 2023 and Resolution 70,698 -N.S. Adopting Regulations for Voucher Program and Establishing an In-Lieu Fee to Support the Provision of Affordable Housing Pursuant to Berkeley Municipal Code 23.328 and Rescinding Resolution 70,668-N.S (attached).

Conditions of Approval – Street Trees
SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 4 of 75 ends
Page 167 of 263 ends
Page 333 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 5 of 5

Pursuant to BMC Section 23.204.060(12), the project shall provide sidewalk amentities necessary to comply with current city standards. Improvements may include pedestrian-scaled lighting, street trees, benches and bicyble racks. In consultation with the City’s consulting arborist, the following conditions have been added to ensure the protection of existing street trees throughout the construction of the building. The memo from the City’s consulting arborist is attached.

Prior to Issuance of Any Building & Safety Permit (Demolition or Construction)

XX. Tree Protection. Tree protection fencing shall be shown on all demolition, site, landscaping, grading, and utility plans, and shall be installed prior to demolition, grubbing, or grading around the five existing Crepe Trees located along California Street. Fences shall be 6 feet in height, composed of chain link with posts sunk into the ground. Fences are to remain until all grading and construction is completed.

At All Times:

XX. Tree Protection – Inspections. Inspections by the City’s consulting arborist may be conducted throughout demolition and construction to ensure compliance with tree protection measures.

Attachments:
• Council Resolution No. 70,698-NS
• Berkeley Municipal Code Chapter 23.328 Inclusionary Housing • Arborist Memorandum – May 5, 2023

Staff Planner: Katrina Lapira, [email protected], (510) 981-7488

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 5 of 75 ends
Page 168 of 263 ends
Page 334 ends

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 6 of 75 ends
Page 169 of 263 ends
Page 335 ends

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 7 of 75 ends
Page 170 of 263 ends
Page 336 ends

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 8 of 75 ends
Page 171 of 263 ends
Page 337 ends

23.328.010

23.328.020

23.328.030

23.328.040

23.328.050
Chapter 23.328

INCLUSIONARY HOUSING
Sections:

Findings and Purpose.

Definitions.

Affordable Housing Requirements.

Waiver or Modification of Affordable Housing Requirements.

Implementation.

23.328.010 Findings and Purpose.

A. The State of California has established a Regional Housing Needs Allocation (RHNA) process under which it allocates a "fair share" of the regional housing need, updated periodically, to each local jurisdiction. The "fair share" allocated to Berkeley increased significantly based on the regional housing needs determination finalized in late 2021. The sixth cycle of the RHNA for the San Francisco Bay Area allocates to Berkeley a "fair share" that calls for adequate sites for 8,934 housing units for the period from 2023 to 2031, including sites for 2,446 Very Low Income units, 1,408 Low Income units, and 1,416 Moderate Income units.

B. The Bay Area suffers from a shortage of affordable housing. As the Bay Area region experiences increased economic growth and a high demand for housing, housing prices continue to rise, which leads to displacement of low income residents and exacerbates the shelter crisis that has led to unacceptably high rates of homelessness in the City of Berkeley and the Bay Area region.

C. In 1990, the City established the Housing Trust Fund program to pool available funding for affordable housing development. The Housing Trust Fund program is funded by federal, state, and local revenues, including by in-lieu and mitigation fees paid by developers of market-rate housing projects under the City’s existing affordable housing ordinances.

D. The City Council hereby finds that there is a legitimate public interest in the provision of affordable housing to
address the crises of displacement, homelessness, and lack of housing affordability in the City, and that there is a significant and increasing need for affordable housing in the City to meet the City’s regional share of housing needs under the California Housing Element Law.

E. The City Council further finds that the public interest would best be served if new affordable housing were integrated into new market-rate residential developments to facilitate economically diverse housing, while also providing alternative options to the on-site construction of affordable housing such as the payment of fees to replenish the City’s Housing Trust Fund program and allowing for the construction of affordable housing on land dedicated by market-rate housing developers.

Ch. 23.328 Inclusionary Housing | Berkeley Municipal Code Page 1 of 8 The Berkeley Municipal Code is current through Ordinance 7854-NS, and legislation passed through February 28, 2023.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 9 of 75 ends
Page 172 of 263 ends
Page 338 ends

F. The City Council intends that this Ordinance be construed as an amendment to the City’s existing affordability requirements, and that the repeal and re-enactment of any requirement shall not be construed to relieve a party of any outstanding obligation to comply with the requirements applicable to any previously approved Housing Development Project. (Ord. 7853-NS § 2, 2023)

23.328.020
Definitions.

A. "Affordable Unit" means a Residential Unit that is in perpetuity affordable to Very Low Income Households or Lower-Income Households, as defined in California Health and Safety Code sections 50052.5 and 50053.

B. "Affordable Housing Compliance Plan" means an enforceable commitment by an Applicant to comply with the requirements of this Chapter that identifies the number and type of Affordable Units, the amount of In-Lieu Fees, and/or the parcels of land (or portions thereof) that will be provided and/or paid by the Applicant to comply with those requirements.

C. "AMI" means the area median income applicable to the City of Berkeley, as defined by the U.S. Department of Housing and Urban Development, or its successor provision, or as established by the City of Berkeley in the event that such median income figures are no longer published by the U.S. Department of Housing and Urban Development.

D. "Applicant" means any individual, person, firm, partnership, association, joint venture, corporation, entity,
combination of entities or authorized representative thereof, who applies to the City for any Housing Development Project.

E. "Housing Development Project" means a development project, including a Mixed-Use Residential project (as defined in 23.502.020(M)(13), involving the new construction of at least one Residential Unit. Projects with one or more buildings or projects including multiple contiguous parcels under common ownership or control shall be considered as a sole Housing Development Project and not as individual projects.

F. "Housing Trust Fund" means the program to finance low and moderate-income housing established by
Resolution No. 55,504-N.S., or any successor fund established for the same purpose.

G. "Lower-Income Household" means a household whose income does not exceed the low-income limits applicable to Alameda County, as defined in California Health and Safety Code section 50079.5 and published
annually pursuant to Title 25 of the California Code of Regulations, Section 6932 (or its successor provision) by the California Department of Housing and Community Development.

H. "Regulatory Agreement and Declaration of Restrictive Covenants" means, for the purposes of this Chapter, a legally binding agreement recorded against the property to codify the requirements and conditions of a Housing Development Project providing Affordable Units.

I. "Residential Unit" means, for purposes of this Chapter, any Dwelling Unit, any Live/Work Unit, or any bedroom of a Group Living Accommodation (GLA) except a GLA in a University-recognized fraternity, sorority or Ch. 23.328 Inclusionary Housing | Berkeley Municipal Code Page 2 of 8 The Berkeley Municipal Code is current through Ordinance 7854-NS, and legislation passed through February 28, 2023.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 10 of 75 ends
Page 173 of 263 ends
Page 339 ends

co-op; provided, however, that for purposes of this Chapter, "Residential Unit" shall not include any Accessory Dwelling Unit or Junior Accessory Dwelling Unit.

J. "Residential Unit Floor Area" means, for the purpose of this Chapter, the floor area of the Residential Unit(s)
of a Housing Development Project.

1. Residential Unit Floor Area shall be measured from the interior of the walls of each unit. The Residential Unit Floor Area shall exclude areas that are not habitable residential square footage such as:
(a) Balconies, whether private or open to all residents (b) Storage lockers not located within residential units (c) Vehicular (e.g., automobile or motorcycle) and bicycle parking areas that are separate areas from the residential unit
(d) Other qualifying areas that are not associated with residential units, upon approval of the Zoning Officer.

2. For Residential Units consisting of Group Living Accommodations, Residential Unit Floor Area shall also include common rooms/lounges and supporting facilities such as kitchens and restrooms.

K. "Very Low Income Household" means a household whose income is no more than 50% of AMI, as defined in California Health and Safety Code section
50105. (Ord. 7853-NS § 2, 2023)

23.328.030 Affordable Housing Requirements.

A. Requirement to Construct Affordable Units.

1. Except as otherwise provided in this Chapter, no permit for the construction of any Housing Development Project shall be issued unless at least 20% of the Residential Units are Affordable Units. When the calculation results in a fractional unit, an Applicant will round up to the nearest whole unit. The Affordable Units shall have the same proportion of unit types (i.e., number of bedrooms) and average size as the market rate units (provided, however, that no Affordable Unit may have more than three bedrooms).

2. In lieu of providing Affordable Units pursuant to Paragraph 1, an Applicant may propose an alternative mix of unit-types to comply with this Chapter by providing Affordable Units that comprise at least 20% of the Residential Unit Floor Area of the Housing Development Project in order to achieve a mix of Affordable Units including two-bedroom or three-bedroom units. The City Manager or their designee may approve the proposed alternative mix of unit- types that meet the requirements of this section.

3. Affordable Units shall be (a) reasonably dispersed throughout the Housing Development Project; and (b) comparable to other Residential Units in the Housing Development Project in terms of appearance, materials, Ch. 23.328 Inclusionary Housing | Berkeley Municipal Code Page 3 of 8 The Berkeley Municipal Code is current through Ordinance 7854-NS, and legislation passed through February 28, 2023.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 11 of 75 ends
Page 174 of 263 ends
Page 340 ends

and finish quality. Residents of Affordable Units shall have access to the same common areas and amenities that are available to residents of other Residential Units in the Housing Development Project.

4. The City Manager or their designee shall adopt rules and regulations (a) establishing the affordable sales price or affordable rent for each Affordable Unit, consistent with the requirements of Health and Safety Code sections 50052.5 and 50053; and (b) ensuring that Affordable Units are sold or rented to Very Low Income and Lower Income Households, consistent with the requirements of this Chapter.

5. Rental Units.
(a) At least 50% of the required Affordable Units in the Housing Development Project shall be offered at a rent that is affordable to Very Low Income Households, up to a maximum requirement of 10% of the total units in the Housing Development Project if the project provides more Affordable Units than are otherwise required by this Chapter.
(b) In determining whether a unit is affordable to Very Low Income or Low Income Households, maximum allowable rent for any affordable unit shall be reduced by an amount equal to the value of the City-published utility allowance provided for Tenant-paid utilities and any other mandatory fee imposed by the property owner as a condition of tenancy.
(c) Any percentage increase in rent of an occupied Affordable Unit shall not exceed the lesser of 65% of the increase in the Consumer Price Index for All Urban Consumers (CPI-U) in the San Francisco-Oakland- San Jose region as reported and published by the U.S. Department of Labor, Bureau of Labor Statistics, for the twelve-month period ending the previous December 31, or 65% of the percentage increase in AMI for the same calendar year. In no event, however, shall the allowable annual adjustment be less than zero (0%) or greater than seven percent (7%).
(d) Affordable Units designated for Very Low Income Households shall be offered for rent to tenants receiving assistance under the Section 8 Program (42 U.S.C. Section 1437f), the Shelter Plus Care Program (42 U.S.C. Section 11403 et. seq.), or any similar state or federally funded rent subsidy program prior to being offered to other potential tenants. The Council may establish related program requirements by resolution.
(e) The owner of any Affordable Unit offered for rent must report to the City annually the occupancy and rents charged for each Affordable Unit, and any other information required pursuant to rules and regulations adopted by the City Manager or their designee.

6. Ownership Units. Inclusionary units in ownership projects shall be sold at a price that is affordable to an appropriate-sized household whose income is no more than 80 percent of the AMI.

7. All Affordable Units shall be subject to a recorded affordability restriction requiring in perpetuity that each Affordable Unit be sold at an affordable sales price or offered for rent at an affordable rent, as defined in this Chapter.

Ch. 23.328 Inclusionary Housing | Berkeley Municipal Code Page 4 of 8 The Berkeley Municipal Code is current through Ordinance 7854-NS, and legislation passed through February 28, 2023.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 12 of 75 ends
Page 175 of 263 ends
Page 341 ends

8. Affordable Live/Work Units shall be proactively marketed by the Applicant and/or owner to income- eligible persons performing a work activity permitted in the district where the project is located whose type of work causes them to have a requirement for a space larger in size than typically found in residential units.

9. An Affordable Unit that is constructed to qualify for a density bonus under Government Code section65915 that otherwise meets the requirements of this Chapter shall qualify as an Affordable Unit under this Chapter.

B. Option to Pay In-Lieu Fee.

1. In lieu of providing some or all of the Affordable Units required under this Chapter (including any fractional units), an Applicant may elect to pay a fee, the amount of which the City Council may establish by resolution ("In-Lieu Fee"). The City Council may by resolution differentiate among types, classes, and locations of Housing Development Projects to the extent permitted by law; may establish separate fees and criteria for the provision of units that are affordable to Very Low Income Households and units that are affordable to Low Income Households; and may establish the method for calculation of the In-Lieu Fee.

2. In-Lieu Fees shall be applied to the Residential Unit Floor Area of a Housing Development Project. For Live/Work units, the In-Lieu Fee shall be applied to the Residential Unit Floor Area that is designated as non- workspace in the zoning permit approvals consistent with BMC section

23.312.040.

3. In-Lieu Fees shall be estimated as part of the preliminary Affordable Housing Compliance Plan and finalized at the time of building permit issuance, consistent with the final Affordable Housing Compliance Plan.

4. In-Lieu Fees shall be paid prior to the issuance of the first Certificate of Occupancy, or if no Certificate of Occupancy is required, prior to the initial occupancy of the Housing Development Project.

5. Up to 15% of In-Lieu Fees collected may be used to pay for administration of the In-Lieu Fee or the Housing Trust Fund program. At least 85% of In-Lieu Fees collected shall be deposited into the City’s Housing Trust Fund program.

C. Option to Dedicate Land.

1. At the discretion of the City Manager or their designee, the requirements of this Chapter may be satisfied by the dedication of land in lieu of constructing Affordable Units within the Housing Development Project if the City Manager or their designee determines that all of the following criteria have been met:
(a) Marketable title to the site is transferred to the City, or an affordable housing developer approved by the City, prior to issuance of building permit of the Housing Development Project pursuant to an agreement between the Applicant and the City.
(b) The site has a General Plan designation that authorizes residential uses and is zoned for residential development at a density to accommodate at least the number of Affordable Units that would otherwise be required under Paragraph A.

Ch. 23.328 Inclusionary Housing | Berkeley Municipal Code Page 5 of 8 The Berkeley Municipal Code is current through Ordinance 7854-NS, and legislation passed through February 28, 2023.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 13 of 75 ends
Page 176 of 263 ends
Page 342 ends

(c) The site is suitable for development of the Affordable Units, taking into consideration its configuration, physical characteristics, location, access, adjacent uses, and applicable development standards and other relevant planning and development criteria including, but not limited to, factors such as the cost of construction or development arising from the nature, condition, or location of the site.
(d) Infrastructure to serve the dedicated site, including, but not limited to, streets and public utilities, are available at the property line and have adequate capacity to serve the maximum allowable residential density permitted under zoning regulations. (e) The site has been evaluated for the presence of hazardous materials and for the presence of geological hazards and all such hazards are or will be mitigated to the satisfaction of the City prior to acceptance of the site by the City.
(f) The value of the site upon the date of dedication is equal to or greater than the in-lieu fee that would otherwise be required under Paragraph A. The value of the site shall be determined pursuant to the program guidelines approved by the City Manager or their designee.

2. The City shall solicit proposals from affordable housing developers to construct restricted income units on the site dedicated to the City, but if the City is unable to obtain a qualified affordable housing developer to construct a viable affordable housing development on the property within two years of its solicitation or to commence construction within five years, the City may sell, transfer, lease, or otherwise dispose of the dedicated site for any purpose. Any funds collected as the result of a sale, transfer, lease, or other disposition of sites dedicated to the City shall be deposited into a fund designated for use in the City’s Housing Trust Fund program. (Ord. 7853-NS § 2, 2023)

23.328.040
Waiver or Modification of Affordable Housing Requirements.

A. The City Manager or their designee may waive or modify up to fifty percent of the requirements of this Chapter at their sole discretion where any of the following conditions are established:

1. A project providing low- or moderate-income housing is funded in whole or in part by the City’s Housing Trust Fund program;

2. The implementation of the requirements of this Chapter would violate the rights of any person under the California or United States Constitutions, any federal law, or any state law governing a matter of statewide concern and applicable to a charter city; or

3. The benefits of the project to the City outweigh the detriment of foregoing the provision of Affordable Housing or the contribution of In-Lieu fees to the Housing Trust Fund program. In weighing the benefits and detriment to the City, the following factors may be considered:
(a) The impact of the requirements of this Chapter on the feasibility of a Housing Development Project; Ch. 23.328 Inclusionary Housing | Berkeley Municipal Code Page 6 of 8 The Berkeley Municipal Code is current through Ordinance 7854-NS, and legislation passed through February 28, 2023.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 14 of 75 ends
Page 177 of 263 ends
Page 343 ends

(b) Other economically beneficial uses of the Applicant’s property; (c) The burdens the Housing Development Project places on the City in terms of increased demand for affordable housing, childcare, public facilities or amenities, or other impacts which reasonably may be anticipated to be generated by or attributable to the Housing Development Project; and (d) The impact on the Housing Trust Fund program of foregoing the payment of any In-Lieu fee that would otherwise be made.

B. Waivers or modifications greater than fifty percent of the amount which otherwise would be required by this Chapter shall be subject to the approval of City Council.

C. The Applicant shall bear the burden of proof to establish eligibility for a waiver or modification of the requirements of this Chapter. (Ord. 7853-NS § 2, 2023)

23.328.050
Implementation.

A. The Applicant for any Use Permit or Zoning Certificate for a Housing Development Project shall submit a preliminary Affordable Housing Compliance Plan to the Zoning Officer at the time of application. The preliminary Affordable Housing Compliance Plan shall be incorporated as a condition of approval of any Use Permit or Zoning Certificate issued to the Applicant. No building permit may be issued for the project until the final Affordable Housing Compliance Plan is approved.

B. The Applicant must execute a Regulatory Agreement and Declaration of Restrictive Covenants to regulate all Affordable Units provided in a Housing Development Project. No building permit may be issued for the project until the Regulatory Agreement and Declaration of Restrictive Covenants are executed.

C. The Affordable Housing Compliance Plan and/or Regulatory Agreement and Declaration of Restrictive Covenants may be amended administratively, provided that the Zoning Officer finds them to be in full compliance with the provisions of this ordinance and State law, prior to issuance of Certificate of Occupancy.

D. The City Manager or their designee may promulgate additional rules and regulations consistent with the
requirements of this Chapter.

E. The City Council may by resolution establish fees for the implementation and administration of this Chapter and may establish administrative penalties for violations of this Chapter.

F. Exemptions. The following types of Housing Development Projects and Residential Units are exempt from this Chapter:

1. A Housing Development Project for which either a building permit was issued on or before April 1, 2023 or a preliminary application including all of the information required by subdivision (a) of California Government Code section
65941.1 was submitted on or before April 1, 2023 shall be subject to this Chapter’s requirements that were in place as of the preliminary application’s submittal date but shall otherwise be Ch. 23.328 Inclusionary Housing | Berkeley Municipal Code Page 7 of 8 The Berkeley Municipal Code is current through Ordinance 7854-NS, and legislation passed through February 28, 2023.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 15 of 75 ends
Page 178 of 263 ends
Page 344 ends

The Berkeley Municipal Code is current through Ordinance 7854-NS, and legislation passed through February 28, 2023.

Disclaimer: The City Clerk’s Office has the official version of the Berkeley Municipal Code. Users should contact the City Clerk’s Office for ordinances passed subsequent to the ordinance cited above.

City Website: www.berkeleyca.gov
Code Publishing Company, A General Code Company
exempt from this Chapter. This exemption shall expire upon the occurrence of any of the circumstances defined in paragraphs (2), (6), or (7) of subdivision (o) of California Government Code section 65589.5 or in subdivision (d) of California Government Code section 65941.

2. A Housing Development Project with 5,000 square feet or less of Residential Unit Floor Area, unless it is part of a larger Housing Development Project. This exemption shall expire on April 1, 2025, or at such time as the City Council modifies or repeals this exemption, whichever date is sooner.

3. A Residential Unit that replaces a unit existing as of April 1, 2023 that has been destroyed by fire, earthquake or other disaster, or that was previously subject to a mitigation fee or inclusionary housing requirement.

4. A Residential Unit existing as of April 1, 2023 that is expanded, renovated, or rehabilitated. (Ord. 7853-NS § 2, 2023)
Ch. 23.328 Inclusionary Housing | Berkeley Municipal Code Page 8 of 8 The Berkeley Municipal
Code is current through Ordinance 7854-NS, and legislation passed through February 28, 2023.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 16 of 75 ends
Page 179 of 263 ends
Page 345 ends

MEMORANDUM
Planning and Development Department

DATE: May 5, 2023

TO: Katrina Lapira, Associate Planner

FROM: Darya Barar, Consulting Urban Forester

SUBJECT: 1589 University Ave. – Arborist Comments

I reviewed Insideouts Landscape Architecture’s landscape plan dated March 16, 2023. Based on my review of the plans I recommend the applicant be required to preserve the five crepe myrtle street trees growing along California Street.

Trees should be protected for the entire construction period with fencing. Fencing shall completely enclose the TREE PROTECTION ZONE and shall be erected prior to demolition, grubbing, or grading (Figure 1). Fences shall be 6 ft. chain link with posts sunk into the ground. Fences are to remain until all grading and construction is completed.

The current plans show seven trees to be planted on University Avenue. Trees should be planted in accordance with the City’s tree planting standards. Flexi-pave shall be used instead of tree grates.

Irrigation is required to be placed in the tree wells. No root barriers shall be used.

Figure 1. Fence trees to be preserved with 6 ft. chain link with posts sunk into the ground for the duration of construction.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 17 of 75 ends
Page 180 of 263 ends
Page 346 ends

1 Jacob, Melinda
From: Zoning Adjustments Board (ZAB)
Subject: FW: 1598 University Ave
From: Larry Mandella <[email protected]>
Sent: Tuesday, May 9, 2023 4:56 PM
To: Zoning Adjustments Board (ZAB) <[email protected]> Subject: 1598 University Ave

WARNING: This is not a City of Berkeley email. Do not click links or attachments unless you trust the sender and know the content is safe.

Dear Members of the Zoning Adjustments Board,
My comment concerns the project at 1598 University Ave.

I have lived in Berkeley since 1968 and our family has lived in our current home since 1974 on Addison St., directly behind the proposed project.

My primary concern is the impact of an eight story building adjacent to the houses just south of the project. The current plan has a step down from 8 to 7 to 6 stories on the West wing of the U‐shaped building. On the East wing, the step down is only 8 to 7 stories.

I strongly wo
uld like to see the developers match the East wing step‐ down to the one on the West Wing, thus making them both 8 to 7 to 6 stories. The height and mass of this project will greatly impact those of us living the closest to it. I believe it would make a significant difference for  the walls nearest us to be as low as possible.

Thank you for your consideration in your deliberations.

Larry Mandella,
1543 Addison St., Berkeley

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 18 of 75 ends
Page 181 of 263 ends
Page 347 ends

1 Jacob, Melinda
From: Zoning Adjustments Board (ZAB)
Subject: FW: Agenda Item No. 4: 1598 University Mixed-Use Project (6031) Attachments: 6031-010j - 1598 University Ave ZAB Comments.pdf From: Lorrie J. LeLe <[email protected]>
Sent: Tuesday, May 9, 2023 4:37 PM
To: Zoning Adjustments Board (ZAB) <[email protected]>; Lapira, Katrina <[email protected]> Cc: Aidan P. Marshall <[email protected]>
Subject: Agenda Item No. 4: 1598 University Mixed‐Use Project (6031)

WARNING: This is not a City of Berkeley email. Do not click links or attachments unless you trust the sender and know the content is safe.

On behalf of East Bay Residents for Responsible Development, we submit the a. ached comments on Agenda Item No. 4.

We are also providing you with a Dropbox link which contains the referenced documents for your convenience.

hƩps://www.dropbox.com/scl/fo/rk2jxl8nmnu56xdn64ukt/h?dl=0&rlkey=hajtr9f6bjaod5ng8z8twv4r8

If you have any quesƟons, please contact Aiden Marshall – [email protected]

Thank you,

Lorrie LeLe
Legal Assistant
Adams Broadwell Joseph & Cardozo
520 Capitol Mall, Suite 350
Sacramento, CA 95814
[email protected] | Phone: 916. 444.6201 Ext. 10 | Fax: 916.444.6209 |

__________________________________
This e-mail may contain material that is confidential, privileged and/or attorney work product for the sole use of the intended recipient. Any review, reliance or distribution by others or forwarding without express permission is strictly prohibited. If you are not the intended recipient, please contact the send and delete all copies.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 19 of 75 ends
Page 182 of 263 ends
Page 348 ends

6031-010j
KEVIN T. CARMICHAEL
CHRISTINA M. CARO
THOMAS A. ENSLOW
KELILAH D. FEDERMAN
RICHARD M. FRANCO
ANDREW J. GRAF
TANYA A. GULESSERIAN
RACHAEL E. KOSS
AIDAN P. MARSHALL
TARA C. RENGIFO

Of Counsel
MARC D. JOSEPH
DANIEL L. CARDOZO

SACRAMENTO OFFICE

520 CAPITOL MALL, SUITE 350
SACRAMENTO, CA 95814 -4721
T E L : ( 9 1 6 ) 4 4 4- 6 2 0 1
F A X : ( 9 1 6 ) 4 4 4- 6 2 0 9

ADAMS BROADWELL JOSEPH & CARDOZO

A PROFESSIONAL CORPORATION

A T T O RN E Y S A T L A W

6 0 1 G A T E W A Y B O U L E V A R D , S U I T E 1 0 0 0 S O U T H S A N F R A N C I S C O , C A 9 4 0 8 0- 7 0 3 7 ___________

T E L : ( 6 5 0 ) 5 8 9- 1 6 6 0
F A X : ( 6 5 0 ) 5 8 9- 5 0 6 2
a m a r s h a l l@ a d a m s b r o a d w e l l . c o m

printed on recycled paper

May 9, 2023

Via Email and Overnight Mail
Yes Duffy, Chairperson
Kimberly Gaffney, Vice Chairperson
Igor Tregub, Member
Michael Thompson, Member
Holly Scheider, Member
Shoshana O’Keefe, Member
Charles Kahn, Member
Brandon Yung, Member
Debra Sanderson, Member
Zoning Adjustments Board
Planning and Development
1947 Center Street, 2nd Floor
Berkeley, CA 94704
Email: [email protected]

Via Email Only
Katrina Lapira, Associate Planner
Email: [email protected]

Re: Agenda Item No. 4: 1598 University Mixed-Use Project (File No.

DRCP2022-0008; ZP2022-0099)

Dear Chairperson Duffy, Vice Chairperson Gaffney, Members: Tregub, Thompson, Schneider, O’Keefe, Kahn, Yung, Sanderson, and Ms. Riemer:

We are writing on behalf of East Bay Residents for Responsible Development (“East Bay Residents” or “EBRRD”) to provide comments on the 1598 University Mixed-Use Project (File No. DRCP2022-0008; ZP2022-0099) proposed by 1598 University Avenue, LLC/NX Ventures/Trachtenberg Architects (“Applicant”). The City of Berkeley (“City) Zoning Adjustments Board (“ZAB”) will consider approval of the Project at the May 11, 2023, ZAB meeting. The ZAB will consider approval of the following Use Permits:

• Use Permit to demolish two non-residential buildings, under Berkeley Municipal Code (BMC) Section 23.326.070
• Use Permit to establish a mixed-use residential building, under BMC Section

23.204.020
SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 20 of 75 ends
Page 183 of 263 ends
Page 349 ends

May 9, 2023

Page 2 ends

6031-010j

printed on recycled paper
• Use Permit to create 5,000 square feet of new floor area in the University Commercial District, under BMC Section 23.204.030(A)
• Use Permit to establish residential uses on the ground floor, under BMC

23.204.060(B)(3)
• Use Permit to reduce the rear setback (interior) to provide greater privacy along the side setback (south) that abuts residential district, under BMC 23204.060.
• Administrative Use Permit for projections that exceed the maximum building height limit, under 23.304.050(A)

The Project consists of the demolition of an existing non-residential structure and construction of a 134,409 square-foot, eight-story mixed-use residential building containing 207 dwelling units (including 21 very low-income units) and 5,787 square foot commercial space, with 39 parking spaces and 92 bicycle parking spaces. The Project is seeking a 50% Density Bonus by providing 15% of the base project units as affordable to very-low income households. The Project site is located at 1598 University Ave., Berkeley, CA 94703 (APN 056 200300100).

The staff report for the ZAB hearing includes a recommendation that the ZAB find the Project categorically exempt from the provisions of the California Environmental Quality Act1 (“CEQA”) pursuant to CEQA Guidelines Section 15332 (“Class 32” or “Infill Development Project”).2 But, as explained herein, and in comments East Bay Residents submitted in advance of the Project’s Preliminary Design Review,3 the City cannot rely on the Class 32 exemption due to the Project’s potentially significant impacts of air quality, noise, traffic, and public health. Since the City defers its own analysis of the Project’s environmental impacts until after Project approval, the staff recommendation that the Project is exempt from CEQA is not supported by substantial evidence and fails to comply with CEQA. Rather, the Project’s substantial size, 24-month construction period, and its proximity to sensitive receptors indicate that the Project’s impacts may be potentially significant, precluding reliance on the Class 32 Exemption. As a result, an environmental impact report (“EIR”) must be prepared for this Project.

Additionally, the Project Applicant has not made a commitment to ensure the Project is built with local skilled and trained workforce, or provide workforce benefits for City of Berkeley or East Bay residents. The Project thus fails to demonstrate consistency with the workforce and economic requirements of the City

1 Pub. Resources Code (“PRC”) §§ 21000 et seq.
2 14 Cal. Code Regs. (“CCR” or “CEQA Guidelines”) §§ 15000 et seq.; Staff Report. 3 Letter from East Bay Residents re: Comments on Agenda Item IV.2 – Preliminary Design Review for the 1598 University Mixed-Use Project (File No. DRCP2022-0008; ZP2022-0099) (April 20, 2023).

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 21 of 75 ends
Page 184 of 263 ends
Page 350 ends

May 9, 2023

Page 3 ends

6031-010j

printed on recycled paper
of Berkeley General Plan (“General Plan”). Inconsistency with applicable General Plan and local plan workforce policies precludes reliance on the Class 32 Exemption, which requires that projects be consistent with the applicable general plan designation and “all applicable general plan policies.”4

The ZAB also lacks the evidence necessary to approve the Project’s requested Use Permits. As required by BMC Section 23.406.040(E), the ZAB must find that the proposed structure will not be detrimental to the health, safety, peace, morals, comfort, or general welfare of persons and adjacent properties to approve the Use Permits. But because the City has deferred environmental review until after approval of the Use Permits, the ZAB lacks substantial evidence to support a conclusion that the Project is exempt from CEQA and will not be detrimental to the general welfare.

East Bay Residents respectfully requests that the ZAB remand the Project to staff to prepare an environmental impact report (“EIR”) pursuant to CEQA. The EIR must contain the necessary supporting analysis to fully disclose and mitigate the Project’s adverse impacts, including but not limited to construction and operational air quality and public health impacts, hazardous materials, noise, and land use impacts. The Project should also incorporate workforce standards which are consistent with the City’s General Plan and Specific Plan workforce goals and policies.5

I. STATEMENT OF INTEREST

East Bay Residents for Responsible Development (“ERRBD” or “East Bay Residents”) is an unincorporated association of individuals and labor organizations that may be adversely affected by the potential impacts associated with Project development. The association includes the UA Plumbers and Pipefitters Local 342, International Brotherhood of Electrical Workers Local 595, Sheet Metal Workers Local 104, Sprinkler Fitters Local 483, and their members and their families who live and/or work in the City of Berkeley and Alameda County.

The individual members of East Bay Residents live, work, and raise their families in the City of Berkeley and Alameda County. They would be directly affected by the Project and its impacts. The organizational members of Residents

4 14 CCR 15332(a).
5 We reserve the right to supplement these comments at later hearings and pro ceedings on the Project. Gov. Code § 65009(b); PRC § 21177(a); Bakersfield Citizens for Local Control v. Bakersfield (“Bakersfield”) (2004) 124 Cal. App. 4th 1184, 1199-1203; see Galante Vineyards v. Monterey Water Dist. (1997) 60 Cal. App. 4th 1109, 1121.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 22 of 75 ends
Page 185 of 263 ends
Page 351 ends

May 9, 2023

Page 4 ends

6031-010j

printed on recycled paper
also have an interest in enforcing public interest, health and safety, labor and environmental laws that encourage sustainable development and ensure a safe working environment for its members. East Bay Residents’ members are also concerned about projects that are built without providing opportunities to improve local recruitment, apprenticeship training, and retention of skilled workforces, and without providing lifesaving healthcare expenditures for the construction workforce.

II. LEGAL STANDARD

CEQA has two basic purposes, neither of which the City has satisfied in this case. First, CEQA is designed to inform decision makers and the public about the potential, significant environmental impacts of a project before harm is done to the environment.6 The EIR is the “heart” of this requirement,7 and has been described as “an environmental ‘alarm bell’ whose purpose it is to alert the public and its responsible officials to environmental changes before they have reached ecological points of no return.”8 To fulfill this purpose, the discussion of impacts in an EIR must be detailed, complete, and “reflect a good faith effort at full disclosure.”9 An adequate EIR must contain facts and analysis, not just an agency’s conclusions.10

Second, CEQA directs public agencies to avoid or reduce environmental damage when possible by requiring imposition of mitigation measures and by requiring the consideration of environmentally superior alternatives.11 CEQA imposes an affirmative obligation on agencies to avoid or reduce environmental harm by adopting feasible project alternatives or mitigation measures to address all potentially significant impacts identified in the agency’s CEQA analysis.12 Without an adequate analysis and description of feasible mitigation measures, it would be impossible for agencies relying upon an EIR or other environmental document to meet this obligation.

6 Cal. Code Regs., tit. 14, § 15002, subd. (a)(1) (“CEQA Guidelines”); Berkeley Keep Jets Over the Bay v. Bd. of Port Comm’rs. (2001) 91 Cal.App.4th 1344, 1354 (“Berkeley Jets”); County of Inyo v.

Yorty (1973) 32 Cal.App.3d 795, 810.
7 No Oil, Inc. v. City of Los Angeles (1974) 13 Cal.3d 68, 84. 8 County of Inyo v. Yorty (1973) 32 Cal.App.3d 795, 810. 9 CEQA Guidelines, § 15151; San Joaquin Raptor/Wildlife Rescue Center v. County of Stanislaus (1994) 27 Cal.App.4th 713, 721-722.
10 See Citizens of Goleta Valley v. Bd. of Supervisors (1990) 52 Cal.3d 553, 568. 11 CEQA Guidelines, § 15002, subd. (a)(2) and (3); Berkeley Jets, 91 Cal.App.4th, at p. 1354; Laurel Heights Improvement Ass’n v. Regents of the University of Cal. (1998) 47 Cal.3d 376, 400. 12 Pub. Resources Code, §§ 21002-21002.1.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 23 of 75 ends
Page 186 of 263 ends
Page 352 ends

May 9, 2023

Page 5 ends

6031-010j

printed on recycled paper
Under CEQA, mitigation measures must be fully enforceable through permit conditions, agreements or other legally binding instruments.13 A CEQA lead agency is precluded from making the required CEQA findings to approve a project unless the record shows that all uncertainties regarding the mitigation of impacts have been resolved. For this reason, an agency may not rely on mitigation measures of uncertain efficacy or feasibility.14 This approach helps “insure the integrity of the process of decision by precluding stubborn problems or serious criticism from being swept under the rug.”15

Following preliminary review of a project to determine whether an activity is subject to CEQA, a lead agency is required to prepare an initial study to determine whether to prepare an EIR or negative declaration, identify whether a program EIR, tiering, or other appropriate process can be used for analysis of the project’s environmental effects, or determine whether a previously prepared EIR could be used with the project, among other purposes.16 CEQA requires an agency to analyze the potential environmental impacts of its proposed actions in an EIR except in certain limited circumstances.17 A negative declaration may be prepared instead of an EIR when, after preparing an initial study, a lead agency determines that a project “would not have a significant effect on the environment.”18

III. THE CITY LACKS SUBSTANTIAL EVIDENCE TO SUPPORT A

CEQA INFILL EXEMPTION

The City improperly determined that the Project qualifies for Infill Exemption under CEQA Guidelines Section 15332. CEQA is “an integral part of any public agency’s decision making process.”19 It was enacted to require public agencies and decision makers to document and consider the environmental implications of their actions before formal decisions are made.20 CEQA requires an agency to conduct adequate environmental review prior to taking any discretionary action that may significantly affect the environment unless an exemption applies.21

13 CEQA Guidelines, § 15126.4, subd. (a)(2).
14 Kings County Farm Bureau v. County of Hanford (1990) 221 Cal.App.3d 692, 727-28 (a groundwater purchase agreement found to be inadequate mitigation because ther e was no record evidence that replacement water was available).
15 Concerned Citizens of Costa Mesa, Inc. v. 32nd Dist. Agricultural Assn. (1986) 42 Cal.3d 929, 935. 16 CEQA Guidelines, §§ 15060, 15063, subd. (c).
17 See, e.g., Pub. Resources Code, § 21100.
18 Quail Botanical Gardens v. City of Encinitas (1994) 29 Cal.App.4th 1597; Pub. Resources Code § 21080(c).
19 Pub. Resources Code § 21006.
20 Id., §§ 21000, 21001.
21 Id., § 21100(a); see also CEQA Guidelines § 15004(a).

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 24 of 75 ends
Page 187 of 263 ends
Page 353 ends

May 9, 2023

Page 6 ends

6031-010j

printed on recycled paper
Thus, exemptions must be narrowly construed and are not to be expanded beyond the scope of their plain language.22

CEQA requires an agency to analyze whether a project conforms with the applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect.23 Here, the Project fails to conform with the General Plan.

A. The Infill Exemption

Section 15332 of the CEQA Guidelines provides an exemption from CEQA for projects characterized as in-fill development meeting the following conditions:

(a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations.
(b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. (c) The project site has no value as habitat for endangered, rare or threatened species.
(d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.
(e) The site can be adequately served by all required utilities and public services.

The infill exemption requires a lead agency provide “substantial evidence to support [their] finding that the Project will not have a significant effect.”24 "Substantial evidence" means enough relevant information and reasonable inferences from this information that a fair argument can be made to support a conclusion, even though other conclusions might also be reached. Whether a fair argument can be made that the project may have a significant effect on the environment is to be determined by examining the whole record before the lead agency.25 If a court locates substantial evidence in the record to support the City’s conclusion, the City’s decision will be upheld.26

22 Castaic Lake Water Agency v. City of Santa Clarita (1995) 41 Cal.App.4th 1257. 23 CEQA Guidelines Appendix G, XI Land Use and Planning. 24 Banker’s Hill, Hillcrest, Park West Community Preservation Group v. City of San Diego (2006) 139 Cal.App.4th 249, 269.
25 CEQA Guidelines § 15384.
26 Bankers Hill Hillcrest, 139 Cal.App.4th at 269.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 25 of 75 ends
Page 188 of 263 ends
Page 354 ends

May 9, 2023

Page 7 ends

6031-010j

printed on recycled paper
The Project fails to meet the requirements of Section 15332(a) and (d) because, as discussed below, the Project is likely to result in inconsistencies with the Berkeley General Plan and may result in potentially significant impacts to public health, air quality, and noise. The record demonstrates that neither the City nor the Applicant have provided substantial evidence demonstrating that the Project qualifies for the infill exemption. By contrast, there is substantial evidence supporting a fair argument that the Project would result in potentially significant environmental effects that require preparation of an EIR.

B. The City Lacks Substantial Evidence to Conclude that the Project Satisfies the Infill Exemption Criteria

i. The City Lacks Substantial Evidence to Support a Conclusion that the Project Will Not Result in Significant Noise and Vibration Impacts

The City failed to provide substantial evidence that the Project will not result in significant noise and vibration impacts. Instead, the Project’s proposed conditions of approval propose to require improperly deferred analysis of the Project’s noise and vibration impacts after the Project is approved, in violation of CEQA.

First, the Staff Report provides no information regarding the baseline noise levels against which to determine the significance of noise from Project construction and operation. The City thus does not have substantial evidence in the record to support a determination that noise and vibration impacts are less than significant.

Second, the Findings and Conditions in Attachment 1 of the Staff Report provide that the Project applicant “shall submit screening level analysis prior to, or concurrent with, demolition building permit. If a screening level analysis shows that the project has the potential to result in damage to structures, a structural engineer or other appropriate professional shall be retained to prepare a vibration impact assessment (assessment)… This study shall establish the baseline condition of these structures, including, but not limited to, the location and extent of any visible cracks or spalls.”27 This condition represents improperly deferred analysis. “By deferring environmental assessment to a future date, the conditions run counter to that policy of CEQA which requires environmental review at the earliest feasible stage in the planning process.”28 The City requires the Applicant to analyze noise and vibration impacts after project approval. This contravenes the purposes of

27 Staff Report, Attachment 1, pg. 9 of 25.
28 Sundstrom (1998) 202 Cal.App.3d 296, 305.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 26 of 75 ends
Page 189 of 263 ends
Page 355 ends

May 9, 2023

Page 8 ends

6031-010j

printed on recycled paper
CEQA, which requires environmental review at the earliest feasible stage in the planning process. The City must prepare an EIR to adequately analyze and mitigate potentially significant noise and vibration impacts.

ii. Substantial Evidence Supports a Fair Argument that the Project Will Result in Significant Noise Impacts

Substantial evidence supports a fair argument that the Project’s noise impacts would exceed the City’s noise significance thresholds. Section 13.40, Community Noise, of the Berkeley Municipal Code establishes the City’s standards for on-site operational noise and construction noise. Section 13.40.050 sets limits for exterior noise generated on a property, as measured at any other property. Table

13.40-129 shows the City’s exterior noise limits that cannot be exceeded for more than 30 minutes in any hour.

Exterior noise generated on a property also cannot exceed the following limits for shorter periods of time in a given hour:

• The noise standard for that land use as specified in Table 13.40-1 plus 5 dBA for a cumulative period of more than 15 minutes in any hour; or • The noise standard for that land use as specified in Table 13.40-1 plus 10 dBA for a cumulative period of more than 5 minutes in any hour; or

29 Berkeley, Municipal Code Section 13.40.050.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 27 of 75 ends
Page 190 of 263 ends
Page 356 ends

May 9, 2023

Page 9 ends

6031-010j

printed on recycled paper
• The noise standard for that land use as specified in Table 13.40-1 plus 15 dBA for a cumulative period of more than 1 minute in any hour; or • The noise standard for that land use as specified in Table 13.40-1 plus 20 dBA for any period of time.

Section 13.40.060 of the Berkeley Municipal Code sets interior noise limits for multi-residential uses as shown in Table 13.40-2. These standards apply within dwellings with their windows in normal seasonal configurations.

Section 13.40.070 of the Berkeley Municipal Code sets standards for construction noise. This section prohibits construction activity between the hours of 7:00 PM and 7:00 AM on weekdays, and between 8:00 PM to 9:00 AM on weekends and holidays, such that the resulting noise creates a noise disturbance across a residential or commercial property line. Table 13.40-3 (“Maximum sound levels for nonscheduled, intermittent, short-term operation (less than 10 days) of mobile equipment”) lists the City’s maximum sound levels for mobile equipment that apply to construction activity “where technically and economically feasible” during permitted hours of construction (Section 13.40.070.B of the Berkeley Municipal Code).

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 28 of 75 ends
Page 191 of 263 ends
Page 357 ends

May 9, 2023

Page 10 ends

6031-010j

printed on recycled paper

Table 13.40-3 lists the City’s maximum sound levels for stationary equipment that apply to construction activity “where technically and economically feasible” during permitted hours of construction (Section 13.40.070.B of the Berkeley Municipal Code).

The Project would likely exceed the construction noise thresholds set forth above. Noise from temporary construction activity can be estimated using the Federal Highway Administration’s Roadway Construction Noise Model (RCNM).

The model applies a typical list of equipment used in multi-story residential developments during each phase of construction. Impact or sonic pile drivers, if used to install foundations, would be the loudest individual noise source. This equipment can generate noise levels exceeding 100 dBA within 50 feet.30 Pile

30 City of Berkeley, Ashby and North Berkeley BART Stations Transit-Oriented Development Zoning Project, Draft Environmental Impact Report SCH#2020110320, October 2021, pg. 4.8-10, available SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 29 of 75 ends
Page 192 of 263 ends
Page 358 ends

May 9, 2023

Page 11 ends

6031-010j

printed on recycled paper
drivers are most often used to set pile foundations for new concrete buildings that are at least six stories in height. Since the proposed Project would allow a building up to eight stories tall, it is reasonably foreseeable that pile drivers could be used in construction.

The aforementioned noise impacts would not be substantially attenuated by distance, as sensitive residential receptors are located adjacent to the Project site:31

As a result, construction noise impacts on these residential receptors could potentially reach 100 dBA, depending on the construction equipment used. The Project’s construction noise impacts would thus potentially exceed significance thresholds in BMC Section 13.40.070, and the City’s record lacks any evidence that noise levels would not exceed these levels. Therefore, substantial evidence demonstrates that a Class 32 exemption is inapplicable and the City lacks substantial evidence to support the exemption.

iii. The City Lacks Substantial Evidence to Support a Conclusion that the Project Will Not Result in Significant Air Quality and Public Health Impacts

The City lacks substantial evidence to support the conclusion that the Project will not result in significant air quality and health risk impacts because the City

at https://files.ceqanet.opr.ca.gov/266033-
3/attachment/EyFhr7sIb9vpYiN2os0U2JXH1_Z1NDR1zkMAQg4tNWn7pnT65Bisli6o1b3px8VW1r5 aRigVUN_t7OF40
31 DRC Meeting Staff Report, Figure 1: Vicinity Map, pg. 3, available at https://berkeleyca.gov/sites/default/files/documents/2023-04- 20_DRC_Item%20IV.2_1598%20University.pdf.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 30 of 75 ends
Page 193 of 263 ends
Page 359 ends

May 9, 2023

Page 12 ends

6031-010j

printed on recycled paper
failed to conduct a health risk analysis. Absent a health risk analysis, the City cannot conclude that air pollution and public health impacts are less than significant to support reliance on a Class 32 Infill Exemption. Moreover, readily available facts demonstrate that the Project is likely result in significant air quality and health risk impacts requiring preparation of an EIR.

As explained in EBRRD’s prior comments, the City failed to prepare a health risk analysis (“HRA”) to quantify the health impact of the Project’s construction and operational emissions on sensitive receptors located near the Project site, violating CEQA’s requirement to disclose the health impacts of a project. In Sierra Club v.

County of Fresno, the California Supreme Court affirmed CEQA’s mandate to protect public health and safety by holding that a CEQA document fails as an informational document when it fails to disclose the public health impacts from air pollutants that would be generated by a development project.32 As the Court explained, “a sufficient discussion of significant impacts requires not merely a determination of whether an impact is significant, but some effort to explain the nature and magnitude of the impact.”33 The Court concluded that the county’s EIR was inadequate for failing to disclose the nature and extent of public health impacts caused by the project’s air pollution. As the Court explained, the EIR failed to comply with CEQA because after reading the EIR, “the public would have no idea of the health consequences that result when more pollutants are added to a nonattainment basin.”34

Here, by failing to produce any analysis of the Project’s health risk, the City fails to disclose the Project’s potential health risks. These risks are potentially significant – the Office of Environmental Health Hazard Assessment’s ("OEHHA”) risk assessment guidelines recommend a formal health risk analysis (“HRA”) for short-term construction exposures to TACs lasting longer than 2 months and exposures from projects lasting more than 6 months should be evaluated for the duration of the project.35 In an HRA, lead agencies must first quantify the

32 (2018) 6 Cal.5th 502, 518–522.
33 Id. at 519, citing Cleveland National Forest Foundation v. San Diego Assn. of Governments (2017) 3 Cal.5th 497, 514–515.
34 Id. at 518. CEQA’s statutory scheme and legislative intent also include an express mandate that agencies analyze human health impacts and determine whether the “environmental effects of a project will cause substantial adverse effects on human beings, either directly or indirectly.” (Public Resources Code § 21083(b)(3) (emphasis added).) Moreover, CEQA directs agencies to “take immediate steps to identify any critical thresholds for the health and safety of the people of the state and take all coordinated actions necessary to prevent such thresholds being reached.” (Public Resources Code § 21000(d) (emphasis added).) 35 Office of Environmental Health Hazard Assessment (OEHHA), Risk Assessment Guidelines:

Guidance Manual for Preparation of Health Risk Assessments, February 2015 (OEHHA 2015), Section 8.2.10: Cancer Risk Evaluation of Short Term Projects, pp. 8-17/18; SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 31 of 75 ends
Page 194 of 263 ends
Page 360 ends

May 9, 2023

Page 13 ends

6031-010j

printed on recycled paper
concentration released into the environment at each of the sensitive receptor locations through air dispersion modeling, calculate the dose of each TAC at that location, and quantify the cancer risk and hazard index for each of the chemicals of concern.36 Following that analysis, then the City can make a determination of the relative significance of the emissions. Here, the Project is located in close proximity to residential receptors, and construction is expected to last for over two months.

Without the requisite analysis of the Project’s health risk impacts, a finding that impacts would be less-than-significant and that the Project is exempt from CEQA would not be supported by substantial evidence.

The City may argue that standard conditions of approval in the staff report would ensure health risk and air quality impacts would be less than significant.

However, CEQA requires the assessment of the severity of a project’s impacts prior to mitigation, not after mitigation.37 Therefore, that argument would be a red herring.

Moreover, even when the standard conditions of approval are considered, they are not adequate to ensure that construction emissions and the health risk posed by exposure to construction TAC emissions would be less than significant. The staff report includes the condition that the Project will either prepare an HRA prior to issuance of the building permits, or “[a]ll construction equipment shall be equipped with Tier 2 or higher engines and the most effective Verified Diesel Emission Control Strategies (VDECS) available for the engine type (Tier 4 engines automatically meet this requirement) as certified by the California Air Resources Board (CARB).38 But the requirement to use “Tier 2 or higher” construction equipment fails to ensure that the Project’s construction TAC emissions will be reduced to levels of insignificance because Tier 2 equipment provides far lower emissions reductions than the most effective emissions-reducing currently on the market – Tier 4 Final equipment.

The United States Environmental Protection Agency’s (“USEPA”) 1998 nonroad engine emission standards were structured as a three-tiered progression.

Tier 1 standards were phased-in from 1996 to 2000 and Tier 2 emission standards were phased in from 2001 to 2006. Tier 3 standards, which applied to engines from 37-560 kilowatts (kW) only, were phased in from 2006 to 2008. The Tier 4 emission

https://oehha.ca.gov/air/crnr/notice-adoption-air-toxics-hot-spots-program-guidance-manual- preparation-health-risk-0.
36 Id.
37 Lotus v. Dept of Transportation (2014) 223 Cal. App. 4th 645, 651-52. 38 Staff Report, Attachment 1, Findings and Conditions, pg. 17 of 25.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 32 of 75 ends
Page 195 of 263 ends
Page 361 ends

May 9, 2023

Page 14 ends

6031-010j

printed on recycled paper
standards were introduced in 2004, and were phased in from 2008 – 2015.39 The Tier 4 emission standards—phased-in from 2008 through 2015—introduce substantial reductions of NOx (for engines above 56 kW) and PM (above 19 kW), as well as more stringent HC limits. CO emission limits remain unchanged from the Tier 2-3 stage.40

The City’s reliance on Tier 2 construction equipment to reduce the Project’s construction DPM and other TAC emissions to less than significant levels is not supported by substantial evidence due to the limited efficacy of Tier 2 equipment and because the Condition does not obligate the Applicant to use the more effective Tier 4 equipment mentioned in the Condition.

iv. The City Lacks Substantial Evidence to Support a Conclusion that the Project Site Will Conform with the General Plan

CEQA requires an agency to analyze whether a project conforms with the applicable land use plan, policy or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect.41 The Housing Accountability Act (“HAA”) also requires a showing of substantial evidence demonstrating that a housing project is consistent, compliant, and in conformity with applicable plans, programs, policies, ordinances, standards, requirements, or other similar provisions in order to be deemed consistent with those land use policies.42

The Project is inconsistent with the General Plan Economic Development & Employment Element, and thus cannot be approved, or deemed consistent with the General Plan, until consistency is demonstrated with substantial evidence.43 The General Plan Economic Development and Employment Element Policy (ED-1) (Employment and Training) provides that the City must “[i]ncrease the number of jobs that go to Berkeley citizens by coordinating economic development efforts with employment placement.”44 Further, the General Plan provides that the City

39 Emission Standards, Nonroad Diesel Engines, available at:
https://www.dieselnet.com/standards/us/nonroad.php#tier3 40 https://www.dieselnet.com/standards/us/nonroad.php#tier3. 41 CEQA Guidelines Appendix G, XI Land Use and Planning. 42 Govt. Code § 65589.5(f)(4).
43 SB 330 requires conformance with applicable, objective general plan and zoning standards . Gov.

Code § 65905.5. (a).
44 Berkeley General Plan Economic Development and Employment Element, p. ED -5. Available at:
https://berkeleyca.gov/sites/default/files/documents/12_Economic%20Development%20and%20Emplo yment%20Element-FINAL.pdf.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 33 of 75 ends
Page 196 of 263 ends
Page 362 ends

May 9, 2023

Page 15 ends

6031-010j

printed on recycled paper
intends to “[w]ork with job training programs and encourage training for life skills, job readiness, and specific target industries.”45 The Project does not include any commitment to provide local construction jobs to Berkeley or East Bay residents, and the record does not contain any evidence demonstrating that the Applicant proposes to contribute to apprenticeship or other construction job training programs, or take any other measures to comply with these General Plan policies in relation to the Project’s construction workforce. The Project is therefore inconsistent with those policies.

Housing development projects in the City must also implement the goals and policies of the General Plan, including the following:

1) Ensure that Berkeley has an adequate supply of decent housing, living wage jobs, and businesses providing basic goods and services.
2) New housing will be developed to expand housing opportunities in Berkeley to meet the needs of all income groups.46

The City has determined that “it is in the City of Berkeley’s economic interest to support a pipeline of skilled workers to accomplish the construction objectives and policies of the Berkeley General Plan.”47 The Project should support this goal by including community benefits such as local hire and healthcare and workforce benefits for its construction workers. Without specific commitments from the Applicant to ensure compliance with these policies, the Project is likely to be detrimental to the general welfare, violates the General Plan, and should not be approved. Since the record is devoid of substantial evidence demonstrating compliance with these General Plan policies, the Project therefore also fails to meet the facial requirements for a CEQA Class 32 exemption.

IV. THE PROJECT MAY BE DETRIMENTAL TO THE GENERAL

WELFARE OF THE CITY, RESIDENTS, AND WORKERS

In order to approve the Project’s requested Use Permits, under Berkeley Municipal Code Section 23.406.040, the Zoning Adjustments Board must find that

45 Id.
46Id.
47 City of Berkeley, Agenda and Staff Report, Berkeley City Council, Council Consent Item 14 Helping Achieve Responsible Development with Healthcare and Apprenticeship Training Standards (HARD HATS), https://berkeleyca.gov/sites/default/files/city-council-meetings/2022-09- 20%20Agenda%20Packet%20-%20Council%20-%20WEB.pdf (“HARD HATS Staff Report”) (Sept. 20, 2022) p. 7.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 34 of 75 ends
Page 197 of 263 ends
Page 363 ends

May 9, 2023

Page 16 ends

6031-010j

printed on recycled paper
the proposed project:

i. Will not be detrimental to the health, safety, peace, morals, comfort, or general welfare of persons residing or visiting in the area or neighborhood of the proposed use; and
ii. Will not be detrimental or injurious to property and improvements of the adjacent properties, the surrounding area or neighborhood, or to the general welfare of the City.

And BMC Section 23.204.060(E) requires certain findings to be made to approve an AUP or Use Permit for a project in the C-U district:

To approve an AUP or Use Permit for a project in the C-U district, the review authority must make the findings in Section 23.406.040 (Use Permits) and find that the proposed use or structure:

1. Is compatible with the purpose of the district;

2. Is compatible with the surrounding uses and buildings;

3. Does not interfere with the continuity of retail and service facilities at the ground level; and

4. Does not exceed the amount and intensity of use that can be served by the available traffic capacity and potential parking supply.

Further, the ZAB may approve a Use Permit for demolition of a non- residential building or structure only if the ZAB finds that “demolition will not be materially detrimental to the commercial needs and public interest of any affected neighborhood or the City of Berkeley”48

A. The Project May Be Detrimental to the General Welfare Due to Potentially Significant Environmental and Public Health Impacts

As shown above, the Project may result in potentially significant air quality, public health, and noise impacts which may pose a detriment to the health, safety, and general welfare of the City of Berkeley. Regarding noise, the Project’s potentially significant noise and vibration impacts contravene the City’s Municipal Code which provides that “[c]ertain sound levels and vibrations are detrimental to the public health, welfare, safety, and quality of life, and are contrary to the public interest.”49 Significant noise impacts from Project construction and operation may be “detrimental to the health, safety, peace, morals, comfort, or general welfare of

48 Id. at § 23.326.070(D)(1).
49 BMC § 13.40.010.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 35 of 75 ends
Page 198 of 263 ends
Page 364 ends

May 9, 2023

Page 17 ends

6031-010j

printed on recycled paper
persons residing or visiting in the area or neighborhood of the proposed use.”50 In order to approve a Use Permit, under Berkeley Municipal Code Section 23.406.040, the ZAB must find that the proposed project is not detrimental to the health or general welfare of the City’s residents. Here, because the Project’s noise and vibration impacts were not analyzed or mitigated and are potentially significant, the City cannot make the necessary non-detriment finding.

Absent disclosure and mitigation of the Project’s potentially significant impacts in an EIR, the City lacks the evidence necessary to support the non- detriment findings required to approve the Use Permits.

B. The Project May Exceed the Amount and Intensity of Use that Can Be Served By the Available Traffic Capacity and Potential Parking Supply.

To approve the Project’s Use Permits, BMC Section 23.204.060(E) requires the ZAB to find that the Project does not exceed the amount and intensity of use that can be served by the available traffic capacity and potential parking supply.

But the City has not supplied evidence to support this finding, and the staff report’s draft Findings and Conditions do not address this determination.

Here, the proposed use may not be adequately served by the available traffic capacity and potential parking supply due to the Project’s inadequate parking facilities. The Project proposes an eight-story mixed-use residential building with 207 dwelling units and 5,787 square foot commercial space, but only provides 39 parking spaces (27 residential, 12 commercial) and 92 bicycle parking spaces. This design will leave many residents without parking, and lead them to seek street parking in the neighborhood.51 This impact will unduly burden parking supply in the neighborhood. This type of impact is described in the University Avenue Strategic Plan: “the University Avenue Study Area must provide for the needs of visitors, as well as the merchants and residents working and living in the area… Most merchants in the University Avenue area, though, perceive a parking shortage and consider it a disadvantage to be located there.52 The City must gather evidence that the parking supply will not be exceeded before the ZAB can approve the Use Permits.

50 BMC § 23.406.040.
51 See City of Berkeley, University Avenue Strategic Plan (1996), pg. x (Immediate Action Item 3 – Expanding Parking Opportunities: “New mixed-use infill development will also generate increased parking demand, which could most effectively be met through a couple of strategically located parking sites”), available at https://berkeleyca.gov/sites/default/files/2022-03/University-Ave- Plan_Cover_Summary.pdf.
52 Id. at 60.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 36 of 75 ends
Page 199 of 263 ends
Page 365 ends

May 9, 2023

Page 18 ends

6031-010j

printed on recycled paper

C. The Project May Be Detrimental to the General Welfare for Failing to Provide Adequate Employment Training and Placement Facilities and Amenities

Municipal Code Section 22.20.020 defines detrimental impacts to include, inter alia, increased demand for workforce housing, training, and benefits: “The increased demand for affordable housing, child care and public services, adequate employment training and placement facilities and amenities, and the other impacts generated by development projects, unless mitigated, are detrimental to the City’s public health, safety and general welfare.”53 Under Section 22.20.020, a detriment to the general welfare occurs when the City fails to mitigate the impacts of a development project, including the increased demand for housing, workforce training, and public services that may result from the Project.54 Pursuant to Municipal Code Section 22.20.020, the Project’s impacts to the general welfare for failure to provide employment training, placement facilities, and amenities, require mitigation.55

As explained above, the ZAB may approve a Use Permit for demolition of a non-residential building or structure only if the ZAB finds that “demolition will not be materially detrimental to the commercial needs and public interest of any affected neighborhood or the City of Berkeley”56 Here, the ZAB cannot make the necessary findings that demolition of the existing structure and construction of the Project is in the public interest, because the Applicant has not provided any evidence demonstrating that Project construction will provide “adequate employment training and placement facilities and amenities” for its construction workforce. In contrast, the addition of community and workforce benefits related to Project construction would promote the general welfare.

Housing projects that are constructed with low-wage or uninsured construction workers are detrimental to the health, safety, peace, morals, comfort, and general welfare of their communities. If the Project were constructed with low- wage or uninsured construction workers, it would be similarly detrimental to persons residing or visiting the City and the Project’s Downtown neighborhood, as well as to the general welfare of the City. The City should request the Applicant

53 BMC § 22.20.020(G) (emphasis added).
54 Id.
55 Id.
56 Id. at § 23.326.070(D)(1).

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 37 of 75 ends
Page 200 of 263 ends
Page 366 ends

May 9, 2023

Page 19 ends

6031-010j

printed on recycled paper
voluntarily include community benefits in the Project’s conditions of approval, including local hire provisions and healthcare standards and benefits in order to promote, and avoid detriment to, the general welfare of the City.

Examples of such conditions were recently adopted for the 2065 Kittredge Street Project, an eight-story, mixed-use building at 2065 Kittredge Street with 187 dwelling units, 4,993 square feet commercial space and 43 parking spaces. On January 31, 2023, the City Council voted unanimously to affirm the Zoning Adjustments Board’s decision to approve the project’s Use Permit with modified conditions of approval. In approving the 2065 Kittredge Street Project, the Berkeley City Council determined that failing to implement General Plan policies ED-1 (Employment and Training), ED-5 (Element Objectives), and ED-12 (Promoting Berkeley) related to Project construction could result in a detriment to the general welfare. The Applicant for the 2065 Kittredge Project voluntarily agreed to add the following language to the project’s findings and conditions of approval:

1. The applicant shall evaluate the feasibility of implementing one or more of the following workforce programs for construction of the Project, but is not required to implement any said program:

a. Participate in a joint labor-management apprenticeship program for each trade engaged in construction of the Project;
b. Participate in an apprenticeship program approved by the State of California Division of Apprenticeship Standards that has a graduation rate of 50% or higher and has graduated an average of thirty (30) apprentices annually for the five (5) years immediately preceding the Covered Project. The applicant will also maintain at least the ratio of apprentices required by California Labor Code section 1777.5 for the duration of the project; or c. Make and require its subcontractors to make hourly contributions to the California Apprenticeship Council (“CAC”) for every apprenticeable craft hour worked on the Project of at least the apprenticeship contribution rate for the classification of “plumber, pipefitter, steamfitter” in Alameda County. d. The applicant shall evaluate the feasibility of making Health Care Expenditures of twenty (20) percent to or on behalf of each construction worker working on the Project in addition to their regular hourly wages during the period of employment. The Health Care Expenditures may be made to a health plan in which the construction worker is enrolled, to the construction worker’ health savings account, and/or to the construction worker in the form of cash. Prior to the issuance of a certificate of occupancy, the applicant shall submit a report to the City Manager all steps taken to comply with this condition, as well as the results of the applicant’s feasibility SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 38 of 75 ends
Page 201 of 263 ends
Page 367 ends

May 9, 2023

Page 20 ends

6031-010j

printed on recycled paper
evaluation, and which, if any, program is implemented for the Project, whether Health Care Expenditures are implemented for the Project, and the number of construction worker recipients of Health Care Expenditures for the Project.

2. The applicant shall make a good faith effort to attempt to meet a thirty (30) percent goal of all workers on the Project construction site be residents of living within ten (10) miles of the Project site and that, if the applicant fails to achieve such goal, documentation showing good faith efforts made to achieve the goal must be furnished to the City of Berkeley. This paragraph does not negate the requirement by the applicant to meet any other applicable requirements required by law.

3. The applicant shall, before obtaining a certificate of occupancy for the Project, furnish an affidavit to the City of Berkeley disclosing the number of union workers for each craft, apprentices, contractors, contractors’ business addresses, number of local workers living within ten (10) miles of the Project site, and Berkeley residents working on the construction workforce for the Project.57

The City Council concluded that the inclusion of these voluntary workforce conditions were consistent with General Plan policies ED-1 (Employment and Training), ED-5 (Element Objectives), and ED-12 (Promoting Berkeley). In this case, such conditions would be consistent with the same General Plan policies, as well as with the Municipal Code general welfare requirements. The City should confer with Applicant about the feasibility of incorporating these or similar voluntary construction workforce conditions into the Project to bring the Project in closer conformance with General Plan and Specific Plan.

D. The Project May Be Detrimental to the General Welfare for Failing to Hire Locally

Absent evidence demonstrating that the Applicant has committed to hire locally, the Project may be detrimental to the general welfare of Berkeley residents.

Local hire commitments are a critical way not only to hire local residents, but to use

57 Berkeley City Council, Annotated Agenda (January 31, 2023) https://berkeleyca.gov/sites/default/files/city-council-meetings/2023-01-31 Annotated Agenda - Council.pdf.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 39 of 75 ends
Page 202 of 263 ends
Page 368 ends

May 9, 2023

Page 21 ends

6031-010j

printed on recycled paper
project hiring needs to target opportunities to low-income residents and people of color who might not otherwise benefit from new development.58

Empirical studies demonstrate that local hire programs help address the fragmentation inherent in the development process, establishing better communication among developers, employers, community organizations, local job training resources, and the workforce development system that can provide job readiness and job retention support services.59 Here, the Project Applicant has not made a commitment to ensure the Project is built with a local skilled and trained workforce. The Project may therefore be detrimental to City goals and the Berkeley community – particularly to its highly qualified construction workforce, who may not have the opportunity to build much-needed housing in their own community. In order to assess the Project’s compliance with Municipal Code general welfare standards and General Plan policies, the City should ask the Applicant to provide evidence related to its proposed local hire percentage for the construction workforce, and inquire whether the Applicant would consider a specific local hire percentage as a community benefit for the Project.

E. The Project May Be Detrimental to the General Welfare for Failing to Provide Healthcare to Construction Workers

The City has several local workforce policies intended to promote the health and viability of its workforce, including payment of livable wages, health benefits, and paid sick leave for certain workers,60 and is in the process of considering an ordinance related to construction workforce benefits, including healthcare.61

While providing construction worker healthcare is not a binding requirement for the Project, providing workforce healthcare promotes the health, safety, and general welfare of local workers and is consistent with the City’s values and policies. The Project has not committed to provide healthcare standards or benefits for the construction workers building the Project. This may result in a detriment to

58 Kathleen Mulligan-Hansel, Making Development Work for Local Residents: Local Hire Programs and Implementation Strategies that Serve Low-Income Communities, (July 2008). Available at:
https://s3.amazonaws.com/proggov21-
uploads/uploads/asset/asset_file/Making_Development_Work_Local_Residents_Mulligan - HanselPWF2008.pdf.
59 Id.
60 See City of Berkeley Workforce Standards and Enforcement, available at https://berkeleyca.gov/doing-business/operating-berkeley/workforce-standards-and-enforcement (last visited 4/26/23).
61 See HARD HATS Staff Report, https://berkeleyca.gov/sites/default/files/city-council-meetings/2022- 09-20%20Agenda%20Packet%20-%20Council%20-%20WEB.pdf.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 40 of 75 ends
Page 203 of 263 ends
Page 369 ends

May 9, 2023

Page 22 ends

6031-010j

printed on recycled paper
the general welfare of the City and its residents, including in particular, to its construction worker residents. If the Project does not provide healthcare for its construction workers, the Project leaves the responsibility of providing for the health, safety, and welfare of the workers and the community on the workers themselves, or on taxpayer-funded public assistance, thus externalizing the cost of construction. This may perpetuate existing income and healthcare inequities for construction workers, potentially causing a detriment to the general welfare by failing to provide for the health and safety of its workers. The City should inquire as to whether the Applicant would provide healthcare benefits to its construction workers as a community benefit of the Project.

F. The City Lacks Substantial Evidence to Support Land Use and Non-Detriment Findings

Project construction will increase the local demand for a construction workforce. The Project’s lack of workforce standards and worker healthcare may exacerbate the existing demand for local affordable housing and public services by construction workers that currently receive low pay without benefits. Without mitigation, these impacts may remain significant and the ZAB would be unable make the necessary findings that the Project complies with the General Plan and zoning code. To comply with the General Plan Economic Development and Employment Element, the City must ensure that new housing developments provide jobs that go to Berkeley residents and provide job training programs and job readiness.

Moreover, the Municipal Code provides that the “Zoning Ordinance establishes minimum requirements to promote the public health, safety, and general welfare.”62 The Municipal Code also provides that, “[t]o the extent possible, it is the government’s responsibility to balance the responsibility to ensure the health, safety, and general welfare of the public at large in a fiscally and environmentally sustainable manner.”63 It is therefore the responsibility of the Zoning Adjustment Board to promote the general welfare beyond the minimum required by law. Here, the ZAB must require the Project to include community benefits like those detailed herein, otherwise, the Project contravenes the Municipal Code and General Plan.

62 BMC § 22.104.030.
63 Id. at § 2.09.020.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 41 of 75 ends
Page 204 of 263 ends
Page 370 ends

May 9, 2023

Page 23 ends

6031-010j

printed on recycled paper
V. THE PROJECT IS INCONSISTENT WITH THE CITY’S HOUSING

ELEMENT

The Project proposes to construct an eight-story residential building containing 207 dwelling units (21 Very Low-Income unit).64 The Project is seeking a 50% Density Bonus by providing 15% of the base project units as affordable to very low-income households. More affordable units must be provided for the Project to be consistent with the City’s Housing Element and state law.

The Regional Housing Needs Assessment is the California State-required process that seeks to ensure cities and counties plan for enough housing in their Housing Element cycle to accommodate all economic segments of the community.65 Accordingly, the Housing Element of the City’s General Plan identifies the City’s housing conditions and needs, evaluates the City’s ability to meet its Regional Housing Needs Allocation (“RHNA”), establishes the goals, objectives, and policies of the City’s housing strategy, and provides an array of programs to create mixed- income neighborhoods across the City.66 The Housing Element, which was amended on February 17, 2023, states that “the City has a remaining RHNA of 5,033 units (1,923 very low income; 852 low income; 1,227 moderate income; and 1,031 above moderate income units)… The City must identify adequate site capacity for this remaining RHNA.”67 Accordingly, Policy H-1 – Extremely Low, Very Low, Low and Moderate-Income Housing – provides: “Increase the number of housing units affordable to Berkeley residents with lower income levels.”68 Projects that do not contribute to the City’s RHNA are inconsistent with the City’s Housing Element, a primary goal of which is to meet the RHNA.

Further, Berkeley Municipal Code Section 23.328.010 provides that residential housing projects constructing five or more dwelling units must include at least 20 percent of the total number of dwelling units within the project as inclusionary units. As an alternative to providing inclusionary units required in an ownership project, the applicant may elect to enter in an agreement with the City to pay fees in-lieu of providing below-market rate units.69

64 https://berkeleyca.gov/sites/default/files/documents/2023-03- 16_DRC_Item%20VII.1_1598%20University_SB330%20Project%20Plans.pdf 65 Cal. Gov. Code Section 65580 – 65589.9; see City of Berkeley, Adopted 2023-2031 Housing Element, available at https://berkeleyca.gov/sites/default/files/documents/Berkeley_2023 - 2031%20Housing%20Element_02-17-2023v2_0.pdf.
66Id.
67 Id. at 107.
68 Id. at 15.
69 Effective July 1, 2022, the fee is set at follows: Paid at Certificate of Occupancy: $46,185 per rental unit; or Paid at building permit: $43,185 per rental unit.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 42 of 75 ends
Page 205 of 263 ends
Page 371 ends

May 9, 2023

Page 24 ends

6031-010j

printed on recycled paper

However, the City has failed to meet its RHNA in previous cycles. Under the 5th RHNA Cycle from 2015-2023, Berkeley was required to plan for 2,959 units.70 This includes 532 at very low income, 442 at low income, 584 at moderate income, and 1,401 at above moderate income. The Housing Element states that 3,742 units have been built, or 126% of the target. However, the targets for affordable housing were missed, with 309 very low income (58%), 130 low income (29%), and 106 moderate income (18%) units completed. 3,197 units of above moderate, or market rate housing was built, which was 228% of the goal.

Here, the Project fails to provide the recommended 20% affordable units, contributing to the City’s pattern of overproducing market-rate housing but underproducing affordable housing. Only 15% of the base Project would be affordable, and only 10% of the total density bonus Project would be affordable.

Although the Project will likely have to pay an in-lieu fee, the Project would not be consistent with the Housing Element because it places the burden on the City to identify adequate sites to construct affordable housing, and the record lacks evidence demonstrating that the City will utilize the in-lieu fee to supply the Project’s allocated affordable units in the timeframe necessary to meet its RHNA.71 Further, it is unclear whether merely paying an in-lieu fee would result in the necessary affordable housing development the City needs to meet its RHNA. The City adopted the affordable housing mitigation fee on June 28, 2011 (Ordinance 7,192-N.S.), well before 2015-2023 RHNA cycle commenced, yet the City’s RHNA was not met.72 Therefore, the Project must provide the recommended affordable units in order to be consistent with the City’s Housing Element and state law.

The Project is one of several other projects proposed by the Applicant, which similarly fail to contribute an adequate percentage of affordable units. The Applicant also proposes to construct the 2900-2920 Shattuck Avenue Project,73 a ten-story residential building containing 221 dwelling units (22 Very Low-Income unit).74 The 2920 Shattuck Avenue project is seeking a 46.25% Density Bonus by providing only 14% of the base project units as affordable to very low-income

70 City of Berkeley, Adopted 2023-2031 Housing Element, pg. D-8. 71 Id. at 107.
72 2015-2023 Berkeley Housing Element, pg. 62, available at https://berkeleyca.gov/sites/default/files/documents/2023-05- 11_ZAB_Item%204_1598%20University_Combined%20Staff%20Report%20and%20Attachments.pdf ; see Resolution 68,074 – N.S.
73 Use Permit #ZP2022-0116 (APN: 053 159000501).
74 City of Berkeley, Zoning Project Application, 2920 Shattuck Ave. Berkeley CA 94705, APN 053 159000501, (Sept. 4, 2022), https://www.dropbox.com/s/528twax3fw4fw9p/2022-09- 04_APP_PCKT_2920%20Shattuck.pdf?dl=0 (“Application Packet”), pdf pg. 2108 of 2143.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 43 of 75 ends
Page 206 of 263 ends
Page 372 ends

May 9, 2023

Page 25 ends

6031-010j

printed on recycled paper
households.75 The Applicant also proposes the 3000 Shattuck Avenue Project, a 10- story (114 feet) mixed-use building utilizing a Density Bonus, with 166 dwellings, including 17 Very Low-Income units, and 1,043 square-feet of commercial space.76 By proposing 17 Very Low Income (VLI) Below Market Rate (BMR) units on site (15 percent of the 111-unit base density), the 3000 Shattuck project is eligible for a 50 percent density bonus, or 56 additional units.77 In sum, these projects each offer only 10% of the total units as affordable. These projects’ inadequate provision of affordable housing – well below the recommended 20% – is a cumulative issue that the City must address before considering approval of this Project.

VI. CONCLUSION

As is discussed herein, the City lacks substantial evidence to rely on a Class 32 Infill Exemption for Project approval due to potentially significant environmental and public health impacts. The Project does not conform with the Berkeley General Plan for failing to support the general welfare through workforce and labor standards, and affordable housing. As a result, the Project cannot be approved until the City complies with CEQA and prepares an initial study and EIR for the Project.

Thank you for your attention to these comments. Please include them in the record of proceedings for the Project.

Sincerely,

Aidan P. Marshall

APM:ljl

75 City of Berkeley, Zoning Project Application, 2920 Shattuck Ave. 76 May 11, 2023 ZAB Agenda, available at https://berkeleyca.gov/sites/default/files/legislative-body- meeting-agendas/2023-05-11_ZAB_Agenda_Linked.pdf.
77 3000 Shattuck Avenue May 11 ZAB Staff Report, pg. 12, available at https://berkeleyca.gov/sites/default/files/documents/2023-05- 11_ZAB_Item%205_3000%20Shattuck_Combined%20Staff%20Report%20and%20Attachments.pdf .

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 44 of 75 ends
Page 207 of 263 ends
Page 373 ends

1 Communictions
From: David Kellogg <[email protected]>
Sent: Monday, May 8, 2023 11:33 AM
To: Zoning Adjustments Board (ZAB)
Cc: Lapira, Katrina
Subject: Public Comment: Original submission date questions & CEQA violations - #ZP2022-0099 WARNING: This is not a City of Berkeley email. Do not click links or attachments unless you trust the sender and know the content is safe.

Dear ZAB,
Please be aware that I will be submitting this project to HCD's Housing Accountability Unit for the following issues as,

unfortunately, the planner and the Planning Department failed to respond to my request for information (copied below).

1. The record contains conflicting information about the original submission date.

As you may know, the original submission date is a critical date with legal significance. It is important that the actual submission date be acknowledged, so that the timelines of state housing law can be properly measured.

The initial incompleteness letter (dated 8/24/22) from the planner includes a claim that the initial submission date was "July 25, 2022" (a Monday). However, the City's Accela system includes multiple indicia, including filenames and fee receipts, that indicate the actual submis
sion date was the preceding Friday, July 23, 2022. Moreover, there are no indicia (other than the incompleteness letter) that support the 7/25/22 date.

If July 23, 2022 is the actual submission date, the project would have bee n deemed completeness and the initial
incompleteness letter barred by state law.

While it is possible there is an innocent explanation behind this apparent discrepancy, neither the planner nor the Planning Department generally has responded to my inquiry for clarification on the submission date.

Because I have not received any response, I intend to forward this issue to HCD's Housing Accountability Unit for further
investigation.

I suggest ZAB also investigate.

2. Planning/ZAB have violated PRC 21080.1/.2, even when applying the City's admitted completeness date (which may be incorrectly late, see above).

The staff report for the ZAB hearing indicates this project was deemed compl ete in January 23, 2023 and that staff
recommends this project be found to be exempt from CEQA (as an "infill development project").

More than 30 days have passed since 1/23/23, and the lead agency (ZAB) has still not complied with PRC 21080.1 by issuing a determination that
the project is in fact exempt from CEQA. Thus, the deadline of PRC 21080.2 has been violated.

Sincerely,
David Kellogg
SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 45 of 75 ends
Page 208 of 263 ends
Page 374 ends

2 ‐‐‐‐‐‐‐‐‐‐ Forwarded message ‐‐‐‐‐‐‐‐‐
From: David Kellogg <[email protected]>
Date: Fri, Apr 28, 2023 at 11:57 AM
Subject: Question on original submission date ‐ #ZP2022‐0099 To: <[email protected]>, <[email protected]>

Dear Katrina Lapira,

Since the online records are inconsistent, I am writing to clarify the original submission date of #ZP2022‐0099.

1. In accella, the initial fees paid date is listed as 7/22/2022.

2. In acella, the filename for the initial submission is "2022‐07‐22_APP_PCKT_1598 University.pdf". Dates within that PDF appear to either match or predate the 7/22/2022 date.

3. In your August 24, 2022 incompleteness letter, there is a statement that the application was "submitted on July 25, 2022."

Since the submission date is a critical date with legal significance, it is important that it be properly listed. As an example, if 7/22/2022 were the proper date, then the August 23,
2022 incompleteness letter would have been improper, as the project would have been deemed complete a few days prior.

Best,
David Kellogg
SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 46 of 75 ends
Page 209 of 263 ends
Page 375 ends

1 Communications
From: Elizabeth Kowal <[email protected]>
Sent: Sunday, May 7, 2023 10:13 PM
To: Harrison, Kate; Lapira, Katrina
Cc: David Ushijima; Ching/Battles; Toni Mester; Steven F; John Dalrymple; Christopher Kroll Subject: CONCERN ABOUT UPCOMING ZAB MEETING Re: 1598 University Ave.

Attachments: letter to DRC and Berkeley City Council 41123.docx; 6031-009 Agenda IV.2 1598 University DRC Comments.pdf; DRC 1598 University Apr. 20th 2023.pdf
WARNING: This is not a City of Berkeley email. Do not click links or attachments unless you trust the sender and know the content is safe.

Hello,
I’m very concerned about the upcoming ZAB meeting planned for May 11, 2023.

I do not have experience working with
this process and I’m not sure to whom I should be addressing these concerns. I’m hoping you can help me with these questions.

I did not think that the 1598 University Project Proposal would be brought up in front of the ZAB committee until there was follow through on the conditions and design
recommendations brought forward by the Design Review Committee on April 20th,  including setting up a meeting with neighbors regarding their strong concerns about privacy, shadowing, trees, step backs, safety, etc. Neighbors have not had the time to prepare for this meeting, wh en we thought this follow‐ up was coming first.

I especially do not understand how this project could be placed on a Consent Calendar when these serious concerns have not yet been addressed!
The 1598 proposed building project came up in front of the Design Review Committee on April 20th.

Our neighborhood group had been meeting for the year prior and many of us attended the meeting and participated.

Many other neighbors sent letters and comments.  Letters were sent from members of other groups also, including the East Bay Residents for Responsible Dev
elopment and members of the Berkeley Neighborhood Council.

A copy of our Change.Org  Petition," Let’s Welcome New Neighbors Not New Towers” was also submitted. It is  signed by 90 neighbors objecting to the project as it is being proposed.  We included the name and email addresses of the signers and some
of their comments.

Sign the Petition
change.org
I have emailed Anne Burns to make sure all
of these letters have been included in the ZAB packet.  I was told that the DRC is part of ZAB, and the materials would be included. Neighbors who wanted to address the ZAB committee directly have not had time to send in their comments.

Have the DNC recommendations been placed as conditions on the developer?  How does this accountability work?
Thank you for your time and attention.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 47 of 75 ends
Page 210 of 263 ends
Page 376 ends

2 I look forward to hearing from you as soon as possible.

Sincerely,
Elizabeth Sharada Kowal
p.s.

Many serious concerns have been communicated by Berkeley residents, including the lack of inclusive affordable housing so that teachers and city workers can continue living in this historically diverse neighborhood; the lack of a city wide plan on the implementation of the density bonus, the inappropriateness of building this project at this important location, an established pedestrian and wheelchair hu
b and pathway to Ohlone Park, BART, NB Senior Center; the need for a review to make sure the project is in full compliance with CEQA, inadequate parking impacting nearby seniors and residents with disabilities, street safety concerns, privacy concerns for immediate neighbors, lack of objective standards
to set policy protecting all Berkeley residents and specific design recommendations including building configuration changes to allow for more open space and benches for pedestrians en route to BART.

I’m including a few letters that were submitted to the DRC committee that I have available. Hopefully the others will be included also.

From E. Kowal:

From John Dalrymple:

David Ushijima
Neighborhood D4 Resident:

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 48 of 75 ends
Page 211 of 263 ends
Page 377 ends

4/11/23

Dear Members of the City of Berkeley Design Review Committee and The Berkeley City Council Comments concerning the proposed project at 1598 University which will be reviewed at the DRC meeting on 4/20/23.

Overview:

Hundreds of neighbors have been speaking for over a year, and most of us share strong ideas about the proposed project at 1598 University Avenue.  Our neighborhood petition opposing the current project design has 88 signatures.

Our neighbors want new, affordable, inclusive housing so that teachers and city workers can keep living here!  This proposed project includes approximately 90% market rate apartments.

We don’t want you to allow (and even encourage) developers to pay an in‐lieu fee to avoid placing additional inclusive affordable housing here, in this location. We are fighting to preserve our historically diverse neighborhood. We want to welcome and enable working class families to continue to be members of our community. Most of our longer‐term residents could not afford to move into the neighborhood today!

We are disappointed that you have not done the work necessary to come up with the mandated objective standards that would determine reasonable shadowing limits for the
immediate neighborhood.

Design Review Issues:

We are asking for neighborhood participation in creating a design that is pedestrian, bicycle, and wheelchair friendly. This location is already an important and established city-wide hub and pedestrian corridor connecting to the North Berkeley BART station, Ohlone Greenway, and the North Berkeley Senior Center. With much of the BART parking being converted to housing, we need a pedestrian-friendly cityscape more than ever. It is not safe to cross at University and Sacramento Streets with multiple turn lanes, trucks, and busses. The light at California Street is the only nearby safe crossing for children, seniors, and everyone else.

To encourage people to get out of their cars we need to have a welcoming cityscape with benches and shade to allow seniors, parents with small children and disabled community members to rest as needed. We don’t want an ugly sheer wall narrowing and shadowing sidewalks. We are asking for more setbacks, open space, and trees for pedestrians and for neighboring homes directly abutted by this tall building.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 49 of 75 ends
Page 212 of 263 ends
Page 378 ends

Please stop the developer from decreasing the size of the original retail space plan. We need a practical retail area that is move-in ready to meet the needs of this quickly expanding community.

This building design will lead to a parking crisis for the many seniors and individuals with disabilities living nearby. 36 spaces for 245 bedrooms will not even cover the expected handicapped parking spaces needed. Even with new residents not qualifying for neighborhood parking passes, parking will be greatly impacted leading to hardship for some existing residents. We are asking you to move towards your goal of minimizing cars in Berkeley while also protecting vulnerable residents.

Summary of Requests:
 Affordable housing in the building, appropriate for working class families!  Complete the required Objec. ve Shadow‐Study and publish city‐wide objecƟve policy and rules to inform construcƟon design.
 Create a pedestrian safety and parking safe
ty plan for the immediate neighborhood
which includes a school, a church, and many senior residents with disabiliƟes.  Include an indoor loading and unloading dock so that trucks do not cause a dangerous double‐parking problem.
 Change design to include open space and setbacks for pedestrians and residen ts.

Consider eliminaƟng the ineffecƟve interior proposed courtyard designed just for residents and add open space to benefit the whole community in this important city‐ wide hub.
 Increase parking to accommodate seniors and residents with disabiliƟes.  Demand that the original sized, mandated retail space be move‐in read y for an appropriate business such as a restaurant/café.
 Include neighborhood parƟcipaƟon in tree selecƟon, bird safe glass, posiƟon of any balconies, etc.

Thank you for your time and attention,
Elizabeth Sharada Kowal and Constantine Philipides, Addison Street (Long term residents, small business owner and public‐school parents) [email protected]

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 50 of 75 ends
Page 213 of 263 ends
Page 379 ends

6031-009
KEVIN T. CARMICHAEL
CHRISTINA M. CARO
THOMAS A. ENSLOW
KELILAH D. FEDERMAN
RICHARD M. FRANCO
ANDREW J. GRAF
TANYA A. GULESSERIAN
RACHAEL E. KOSS
AIDAN P. MARSHALL
TARA C. RENGIFO

Of Counsel
MARC D. JOSEPH
DANIEL L. CARDOZO

SACRAMENTO OFFICE

520 CAPITOL MALL, SUITE 350
SACRAMENTO, CA 95814 -4721
T E L : ( 9 1 6 ) 4 4 4- 6 2 0 1
F A X : ( 9 1 6 ) 4 4 4- 6 2 0 9

ADAMS BROADWELL JOSEPH & CARDOZO

A PROFESSIONAL CORPORATION

A T T O RN E Y S A T L A W

6 0 1 G A T E W A Y B O U L E V A R D , S U I T E 1 0 0 0 S O U T H S A N F R A N C I S C O , C A 9 4 0 8 0- 7 0 3 7 ___________

T E L : ( 6 5 0 ) 5 8 9- 1 6 6 0
F A X : ( 6 5 0 ) 5 8 9- 5 0 6 2
a m a r s h a l l@ a d a m s b r o a d w e l l . c o m

printed on recycled paper

April 20, 2023

Via Email and Overnight Mail
Janet Tam, Chair
Kimberly Gaffney, Vice-Chair
Members Steve Finacom, Charles Kahn, Lillian Mitchell
Diana Pink, Cameron Woo
c/o Secretary of the Committee, Anne Burns
City of Berkeley Design Review Committee
1947 Center Street, 3rd Floor,
Berkeley, CA 94704
Email: [email protected]

Email Only
Jordan Klein, Director
Planning and Development Department
Email: [email protected]
Katrina Lapira, Associate Planner
Planning and Development Department
Email: [email protected]

Re: Comments on Agenda Item IV.2 – Preliminary Design Review for the 1598 University Mixed-Use Project (File No. DRCP2022-0008; ZP2022-0099)

Dear Chair Tam, Vice-Chair Gaffney, Mr. Finacom, Mr. Kahn, Ms. Mitchell, Ms.

Pink, and Mr. Woo:

We are writing on behalf of East Bay Residents for Responsible Development (“East Bay Residents” or “EBRRD”) to provide comments on the 1598 University Mixed-Use Project (File No. DRCP2022-0008; ZP2022-0099) proposed by 1598 University Avenue, LLC/NX Ventures (“Applicant”). The City of Berkeley (“City) Design Review Committee (“DRC”) will conduct Preliminary Design Review of the Project at the April 20, 2023 DRC meeting.

The Project consists of the demolition of an existing non-residential structure and construction of a 134,409 square-foot, eight-story mixed-use residential building containing 207 dwelling units (including 21 very low-income units) and 5,787 square foot commercial space, with 39 parking spaces and 92 bicycle parking spaces. The Project is seeking a 50% Density Bonus by providing 15% of the base SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 51 of 75 ends
Page 214 of 263 ends
Page 380 ends

April 20, 2023

Page 2 ends

6031-009
project units as affordable to very-low income households. The Project site is located at 1598 University Ave., Berkeley, CA 94703 (APN 056 200300100).

The Project seeks the several Use Permits:

• Use Permit to demolish two non-residential buildings, under Berkeley Municipal Code (BMC) Section 23.326.070
• Use Permit to establish a mixed-use residential building, under BMC Section

23.204.020
• Use Permit to create 5,000 square feet of new floor area in the University Commercial District, under BMC Section 23.204.030(A)
• Use Permit to establish residential uses on the ground floor, under BMC

23.204.060(B)(3)
• Administrative Use Permit for projections that exceed the maximum building height limit, under 23.304.050(A)

The DRC meeting staff report includes a recommendation that the Zoning Adjustments Board find the project categorically exempt from the provisions of CEQA1 pursuant to Section 15332 of the CEQA Guidelines (“Infill Development Project”).2 As discussed herein, the City cannot find the Project exempt from CEQA due to the Project’s potentially significant impacts of air quality, noise, traffic, and public health. Since the City has not released any analysis on the Project’s environmental impacts, the staff recommendation that the Project is exempt from CEQA is not supported by substantial evidence. Rather, the Project’s substantial size, 24-month construction period, and its proximity to sensitive receptors indicate that the Project’s impacts may be potentially significant. As a result, an environmental impact report (“EIR”) must be prepared to adequately analyze and mitigate these impacts.

Further, the Project’s design is inconsistent with the neighborhood context due to its massing and lack of adequate parking. The Project is also inconsistent with the City’s affordable housing and workforce goals. EBRRD respectfully requests that the DRC not recommend approval of the Project until these flaws have been resolved.

1 Public Resources Code § 21000 et seq., and California Code of Regulations, Section 15000, et seq. 2 Staff Report, pg. 8, available at https://berkeleyca.gov/sites/default/files/documents/2023-04- 20_DRC_Item%20IV.2_1598%20University.pdf.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 52 of 75 ends
Page 215 of 263 ends
Page 381 ends

April 20, 2023

Page 3 ends

6031-009
I. STATEMENT OF INTEREST

East Bay Residents for Responsible Development is an unincorporated association of individuals and labor organizations that may be adversely affected by the potential impacts associated with Project development. The association includes the UA Plumbers and Pipefitters Local 342, International Brotherhood of Electrical Workers Local 595, Sheet Metal Workers Local 104, Sprinkler Fitters Local 483, their members and families, and City and Alameda County residents.

The individual members of East Bay Residents live, work, and raise their families in the City of Berkeley and Alameda County. They would be directly affected by the Project and its impacts. The organizational members of Residents also have an interest in enforcing public interest, health and safety, labor and environmental laws that encourage sustainable development and ensure a safe working environment for its members. Residents’ members are also concerned about projects that are built without providing opportunities to improve local recruitment, apprenticeship training, and retention of skilled workforces, and without providing lifesaving healthcare expenditures for the construction workforce.

II. THE CITY MUST COMPLY WITH CEQA

The staff report includes a recommendation that the Zoning Adjustments Board (“ZAB”) find the Project categorically exempt from the provisions of CEQA3 pursuant to Section 15332 of the CEQA Guidelines (“Infill Development Project”).4 East Bay Residents requests and urges the City to comply with CEQA by preparing an environmental impact report (“EIR”) for the Project.

CEQA requires that an agency analyze the potential environmental impacts of its proposed actions in an EIR, except in certain limited circumstances.5 The EIR is the very heart of CEQA.6 “The foremost principle in interpreting CEQA is that the Legislature intended the act to be read so as to afford the fullest possible protection to the environment within the reasonable scope of the statutory language.”7

3 Public Resources Code § 21000 et seq., and California Code of Regulations, Section 15000, et seq. 4 Staff Report, pg. 8, available at https://berkeleyca.gov/sites/default/files/documents/2023-04- 20_DRC_Item%20IV.2_1598%20University.pdf.
5 See, e.g., PRC § 21100.
6 Dunn-Edwards v. BAAQMD (1992) 9 Cal.App.4th 644, 652. 7 Communities. for a Better Env. v. Cal. Res. Agency (2002) 103 Cal. App.4th 98, 109 (“CBE v. CRA”).

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 53 of 75 ends
Page 216 of 263 ends
Page 382 ends

April 20, 2023

Page 4 ends

6031-009
CEQA has two primary purposes. First, CEQA is designed to inform decision makers and the public about the potential, significant environmental effects of a project.8 “Its purpose is to inform the public and its responsible officials of the environmental consequences of their decisions before they are made. Thus, the EIR ‘protects not only the environment but also informed self-government.’”9 The EIR has been described as “an environmental ‘alarm bell’ whose purpose it is to alert the public and its responsible officials to environmental changes before they have reached ecological points of no return.”10

Second, CEQA requires public agencies to avoid or reduce environmental damage when “feasible” by requiring “environmentally superior” alternatives and all feasible mitigation measures.11 The EIR serves to provide agencies and the public with information about the environmental impacts of a proposed project and to “identify ways that environmental damage can be avoided or significantly reduced.”12 If the project will have a significant effect on the environment, the agency may approve the project only if it finds that it has “eliminated or substantially lessened all significant effects on the environment where feasible” and that any unavoidable significant effects on the environment are “acceptable due to overriding concerns.”13

Under CEQA, mitigation measures must be fully enforceable through permit conditions, agreements or other legally binding instruments.14 A CEQA lead agency is precluded from making the required CEQA findings to approve a project unless the record shows that all uncertainties regarding the mitigation of impacts have been resolved. For this reason, an agency may not rely on mitigation measures of uncertain efficacy or feasibility.15 This approach helps “ensure the integrity of the process of decision by precluding stubborn problems or serious criticism from being swept under the rug.”16

8 14 Cal. Code Regs. § 15002(a)(1).
9 Citizens of Goleta Valley v. Board of Supervisors (1990) 52 Cal. 3d 553, 564. 10 Berkeley Keep Jets Over the Bay v. Bd. of Port Comm’rs. (2001) 91 Cal. App. 4th 1344, 1354 (“Berkeley Jets”); County of Inyo v. Yorty (1973) 32 Cal.App.3d 795, 810. 11 14 CCR § 15002(a)(2) and (3); see also Berkeley Jets, 91 Cal.App.4th at 1354; Citizens of Goleta Valley, 52 Cal.3d at pg. 564.
12 14 Cal. Code Regs. §15002(a)(2).
13 PRC § 21081; 14 CCR § 15092(b)(2)(A) & (B).
14 CEQA Guidelines, § 15126.4, subd. (a)(2).
15 Kings County Farm Bureau v. County of Hanford (1990) 221 Cal.App.3d 692, 727-28 (a groundwater purchase agreement found to be inadequate mitigation because there was no record evidence that replacement water was available).
16 Concerned Citizens of Costa Mesa, Inc. v. 32nd Dist. Agricultural Assn. (1986) 42 Cal.3d 929, 935.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 54 of 75 ends
Page 217 of 263 ends
Page 383 ends

April 20, 2023

Page 5 ends

6031-009
CEQA identifies certain classes of projects which are exempt from the provisions of CEQA, called categorical exemptions.17 Categorical exemptions apply to certain narrow classes of activities that generally do not have a significant effect on the environment.18 “Thus an agency’s finding that a particular proposed project comes within one of the exempt classes necessarily includes an implied finding that the project has no significant effect on the environment.”19 “It follows that where there is any reasonable possibility that a project or activity may have a significant effect on the environment, an exemption would be improper.”20

CEQA exemptions must be narrowly construed and are not to be expanded beyond the scope of their plain language.21 They should not be construed so broadly as to include classes of projects that do not normally satisfy the requirements for a categorical exemption.22 Erroneous reliance by a lead agency on a categorical exemption constitutes a prejudicial abuse of discretion and a violation of CEQA.23 “[I]f the court perceives there was substantial evidence that the project might have an adverse impact, but the agency failed to secure preparation of an EIR, the agency’s action must be set aside because the agency abused its discretion by failing to follow the law.”24

To qualify for a categorical exemption, a lead agency must provide “substantial evidence to support [its] finding that the Project will not have a significant effect.”25 “Substantial evidence” means enough relevant information and reasonable inferences from this information that a fair argument can be made to support a conclusion, even though other conclusions might also be reached. Whether a fair argument can be made that the project may have a significant effect on the environment is to be determined by examining the whole record before the lead agency.26 If a court locates substantial evidence in the record to support the

17 PRC § 21084(a); 14 CCR §§ 15300, 15354.
18 PRC § 21084(a); 14 CCR §§ 15300, 15354; Muzzy Ranch Co. v. Solano County Airport Land Use Com. (2007) 41 Cal.4th 372, 380.
19 Davidon Homes v. City of San Jose (1997) 54 Cal.App.4th 106, 115. 20 Azusa Land Reclamation Co. v. Main San Gabriel Basin Watermaster (1997) 52 Cal.App.4th 1165, 1191 (“Azusa Land Reclamation”), quoting Wildlife Alive v. Chickering (1976) 18 Cal.3d 190, 205– 206.
21 Castaic Lake Water Agency v. City of Santa Clarita (1995) 41 Cal.App.4th 1257. 22 Azusa Land Reclamation (1997) 52 Cal.App.4th 1165, 1192. 23 Azusa, 52 Cal.App.4th at 1192.
24 Dunn-Edwards Corp. v. Bay Area Air Quality Mgmt. Dist. (1992) 9 Cal.App.4th 644, 656). 25 Banker’s Hill, Hillcrest, Park West Community Preservation Group v. City of San Diego (2006) 139 Cal.App.4th 249, 269.
26 CEQA Guidelines § 15384.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 55 of 75 ends
Page 218 of 263 ends
Page 384 ends

April 20, 2023

Page 6 ends

6031-009
agency’s conclusion, the agency’s decision will be upheld.27 If, however, the record lacks substantial evidence, as here, a reviewing court will not uphold an exemption determination.

Section 15332 of the CEQA Guidelines provides an exemption from CEQA for projects characterized as in-fill development meeting the conditions:

(a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations.
(b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. (c) The project site has no value as habitat for endangered, rare or threatened species.
(d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.
(e) The site can be adequately served by all required utilities and public services.

CEQA also contains several exceptions to categorical exemptions. In particular, a categorical exemption shall not be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to “unusual circumstances,”28 or where there is a reasonable possibility that the activity will have a significant effect on the environment, including (1) when “the cumulative impact of successive projects of the same type in the same place, over time is significant.”29 An agency may not rely on a categorical exemption if to do so would require the imposition of mitigation measures to reduce potentially significant effects.30

Here, the City has presented no evidence supporting its assumption that a Class 32 Exemption or any other CEQA exemption are inapplicable to the Project.

Moreover, the Project’s size and scope indicate that the Project may have potentially significant effects on air quality, health risk, traffic, and noise – impacts which disqualify the Project from a Class 32 exemption.31

27 Bankers Hill Hillcrest, 139 Cal.App.4th at 269.
28 14 CCR § 15300.2(c).
29 14 CCR § 15300.2(b).
30 Salmon Pro. & Watershed Network v. County of Marin (“SPAWN”) (2004) 125 Cal.App.4th 1098, 1198-1201.
31 The Project’s potentially significant effects also create exceptions to an exemption under 14 CCR § 15300.2(b), (c).

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 56 of 75 ends
Page 219 of 263 ends
Page 385 ends

April 20, 2023

Page 7 ends

6031-009
A. Health Risk

The City lacks substantial evidence to support its reliance on an exemption without analyzing the health risk impacts of Project construction and operation to workers and nearby sensitive receptors.

CEQA requires analysis of human health impacts. CEQA Guidelines Section 15065(a)(4) provides that the City is required to find a project will have a significant impact on the environment and require an EIR if the environmental effects of a project will cause a substantial adverse effect on human beings.32 The Supreme Court has also explained that CEQA requires the lead agency to disclose the health consequences that result from exposure to a project’s air emissions.33

The Project’s construction would likely increase health risks in the surrounding community by contributing Toxic Air Contaminants (“TACs”) such as Diesel Particulate Matter (“DPM”) during construction.34 During the Project’s construction, heavy equipment and diesel trucks would emit DPM, and during operations, a backup generator, if proposed, would emit DPM. DPM has been linked to a range of serious health problems including an increase in respiratory disease, lung damage, cancer, and premature death.35 The Project’s emissions of DPM would impact numerous sensitive receptors, including residents in residential buildings located adjacent to the Project site.

For development projects like this one, the Office of Environmental Health Hazard Assessment’s ("OEHHA”) risk assessment guidelines recommend a formal health risk analysis (“HRA”) for short-term construction exposures to TACs lasting longer than 2 months and exposures from projects lasting more than 6 months should be evaluated for the duration of the project.36 In an HRA, lead agencies must first quantify the concentration released into the environment at each of the sensitive receptor locations through air dispersion modeling, calculate the dose of each TAC at that location, and quantify the cancer risk and hazard index for each of

32 14 CCR § 15065(a)(4); PRC § 21083(b)(3), (d).
33 Sierra Club v. County of Fresno (2018) 6 Cal.5th 502, 516, 523. 34 39655 of the California Health and Safety Code; California Air Resources Board, https://ww2.arb.ca.gov/resources/overview-diesel-exhaust-and-health. 35 California Air Resources Board, https://ww2.arb.ca.gov/resources/overview-diesel-exhaust-and- health.
36 Office of Environmental Health Hazard Assessment (OEHHA), Risk Assessment Guidelines:

Guidance Manual for Preparation of Health Risk Assessments, February 2015 (OEHHA 2015), Section 8.2.10: Cancer Risk Evaluation of Short Term Projects, pp. 8-17/18; https://oehha.ca.gov/air/crnr/notice-adoption-air-toxics-hot-spots-program-guidance-manual- preparation-health-risk-0.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 57 of 75 ends
Page 220 of 263 ends
Page 386 ends

April 20, 2023

Page 8 ends

6031-009
the chemicals of concern.37 Following that analysis, then the City can make a determination of the relative significance of the emissions.

Here, the Project is located in close proximity to residential receptors, and construction is expected to last for 24 months. Without the requisite analysis of the Project’s health risk impacts, a finding that impacts would be less-than-significant and that the Project is exempt from CEQA would not be supported by substantial evidence.

B. Noise

Regarding noise, the Project’s construction and operation may generate noise impacts that exceed applicable significance thresholds, making a CEQA exemption inapplicable. Further, the Project includes several sources of potential sleep- disturbing operational noise sources, including mechanical equipment, open space areas, balconies, and roadway traffic noise. Noise from these sources would likely have an acute impact on the sensitive residential receptors located adjacent to the Project site. Without analysis of noise from the Project’s construction and proposed operations, the City lacks substantial evidence to find the Project exempt.

In sum, since the City has not prepared analysis on the Project’s environmental impacts, the staff recommendation that the Project is exempt from CEQA is not supported by substantial evidence. Rather, the scale of development proposed by the Project and its proximity to sensitive receptors indicate that the Project’s impacts are potentially significant. As a result, an EIR must be prepared to adequately analyze and mitigate these impacts.

III. THE PROJECT IS INCONSISTENT WITH THE NEIGHBORHOOD

CONTEXT

The DRC staff report states that the DRC will consider the Project in the “neighborhood context.”38 The Project proposes a 134,409 square-foot, eight-story mixed-use residential building in a neighborhood containing 1-3 story residential and commercial structures. Despite being located adjacent to 1-3 story residential buildings, the Project’s design fails to include any step-backs on its north, west, and east sides.

37 Id.
38 Staff report, pg. 6.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 58 of 75 ends
Page 221 of 263 ends
Page 387 ends

April 20, 2023

Page 9 ends

6031-009
The Project design also fails to include adequate parking facilities. The Project proposes 207 dwelling units and a 5,787 square foot commercial space, but the current design only provides 39 parking spaces (27 residential, 12 commercial) and 92 bicycle parking spaces. This design will leave many residents without parking, and lead them to seek street parking in the neighborhood. This impact will unduly burden parking supply in the neighborhood.

Per Berkeley Municipal Code Section 23.204.060(E), to approve a use permit for a project in the C-U district, the review authority must find that the proposed use or structure “[d]oes not exceed the amount and intensity of use that can be served by the available traffic capacity and potential parking supply.” This provision indicates that compatibility with the neighborhood’s parking supply is essential for a project to be consistent in the neighborhood context. Since the Project’s current design would only provide parking for a small percentage of its residents, the design is incompatible with the neighborhood. Thus, the Design Review Committee should not recommend approval of the Project’s design to the Zoning Adjustments Board.

IV. THE PROJECT IS INCONSISTENT WITH THE CITY’S HOUSING

ELEMENT

The Project proposes to construct an eight-story residential building containing 207 dwelling units (21 Very Low-Income unit).39 The Project is seeking a 50% Density Bonus by providing 15% of the base project units as affordable to very low-income households. More affordable units must be provided for the Project to be consistent with the City’s Housing Element and state law.

The Regional Housing Needs Assessment is the California State-required process that seeks to ensure cities and counties plan for enough housing in their Housing Element cycle to accommodate all economic segments of the community.40 Accordingly, the Housing Element of the City’s General Plan identifies the City’s housing conditions and needs, evaluates the City’s ability to meet its Regional Housing Needs Allocation (“RHNA”), establishes the goals, objectives, and policies of the City’s housing strategy, and provides an array of programs to create mixed- income neighborhoods across the City.41 The Housing Element, which was amended

39 https://berkeleyca.gov/sites/default/files/documents/2023-03- 16_DRC_Item%20VII.1_1598%20University_SB330%20Project%20Plans.pdf 40 Cal. Gov. Code Section 65580 – 65589.9; see City of Berkeley, Adopted 2023-2031 Housing Element, available at https://berkeleyca.gov/sites/default/files/documents/Berkeley_2023 - 2031%20Housing%20Element_02-17-2023v2_0.pdf.
41Id.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 59 of 75 ends
Page 222 of 263 ends
Page 388 ends

April 20, 2023

Page 10 ends

6031-009
on February 17, 2023, states that “the City has a remaining RHNA of 5,033 units (1,923 very low income; 852 low income; 1,227 moderate income; and 1,031 above moderate income units)… The City must identify adequate site capacity for this remaining RHNA.”42 Accordingly, Policy H-1 – Extremely Low, Very Low, Low and Moderate-Income Housing – provides: “Increase the number of housing units affordable to Berkeley residents with lower income levels.”43 Because the City has not produced and is not expected to produce enough affordable housing to meet its RHNA, projects that do not contribute to the City’s RHNA are inconsistent with the City’s Housing Element, a primary goal of which is to meet the RHNA.

Berkeley Municipal Code Section 23.328.010 provides that residential housing projects constructing five or more dwelling units must include at least 20 percent of the total number of dwelling units within the project as inclusionary units. As an alternative to providing inclusionary units required in an ownership project, the applicant may elect to enter in an agreement with the City to pay fees in-lieu of providing below-market rate units.44

Here, the Project fails to provide the recommended 20% affordable units.

Although the Project will likely have to pay an in-lieu fee, the Project would not be consistent with the Housing Element because it places the burden on the City to identify adequate sites to construct affordable housing, and the record lacks evidence demonstrating that the City will utilize the in lieu fee to supply the Project’s allocated affordable units in the timeframe necessary to meet its RHNA.45

A. THE PROJECT IS INCONSISTENT WITH GENERAL PLAN

WORKFORCE GOALS AND MAY BE DETRIMENTAL TO THE

GENERAL WELFARE OF THE CITY, RESIDENTS, AND

WORKERS

The Berkeley General Plan’s Economic Development and Employment Element includes a number of policies and actions that are intended to support job training, a local workforce, increase social and economic equity, and gather economic and demographic information pertaining to the Berkeley economy.46

42 Id. at 107.
43 Id. at 15.
44 Effective July 1, 2022, the fee is set at follows: Paid at Certificate of Occupancy: $46,185 per rental unit; or Paid at building permit: $43,185 per rental unit. 45 Id. at 107.
46 Berkeley General Plan Economic Development and Employment Element, GP Policies ED -1, ED-5, ED-12.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 60 of 75 ends
Page 223 of 263 ends
Page 389 ends

April 20, 2023

Page 11 ends

6031-009
The record lacks evidence demonstrating that the Project Applicant has made a commitment to build the Project using a local skilled and trained workforce, to provide apprenticeship training opportunities, or to provide healthcare for its construction workforce. These shortcomings render the Project inconsistent with Berkeley’s General Plan policies and goals which seek to ensure that Berkeley has an adequate supply of decent housing and living wage jobs. Unless these inconsistencies are mitigated,47 Project construction would be detrimental to the general welfare of the City, its residents, and its workers, in violation of the City’s zoning code.48
The Berkeley General Plan Economic Development and Employment Element provides that it is the Policy (ED-1) of the City to “Increase the number of jobs that go to Berkeley citizens by coordinating economic development efforts with employment placement.”49 Further, the General Plan provides that the City intends to “[w]ork with job training programs and encourage training for life skills, job readiness, and specific target industries.”50
Additionally, housing development projects in the City must implement the goals and policies of the General Plan, including promoting:
1) Availability of basic goods and services that are affordable to local residents.
2) Employment for local residents at living wages.51
Policy ED-1 (Employment and Training) provides that it is the Policy of the City to “Increase the number of jobs that go to Berkeley citizens by coordinating economic development efforts with employment placement through the following actions:

A. Work with job training programs and encourage training for life skills, job readiness, and specific target industries, including industrial companies in West Berkeley.
47 Gov. Code § 65905.5. (a).
48 BMC §§ 23.406.040(E)(1); 22.20.020.
49 Berkeley General Plan Economic Development and Employment Element, p g. ED-5. Available at:
https://berkeleyca.gov/sites/default/files/documents/12_Economic%20Development%20and%20Emplo yment%20Element-FINAL.pdf.
50 Id.
51 Id. at Policy ED-4, p. ED-7.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 61 of 75 ends
Page 224 of 263 ends
Page 390 ends

April 20, 2023

Page 12 ends

6031-009
B. Provide labor market information from data sources and industry sectors to local educational institutions and training agencies for adults and youths.

C. Coordinate City employment and job training programs with the University of California, Vista College, and other local educational institutions.

D. Encourage the University to hire Berkeley residents.

E. Encourage the Berkeley Unified School District to provide education and job skills appropriate to jobs in Berkeley and the region.

F. Create a collaborative process among the City, employers, and local disability/minority organizations to provide access to economic and artistic opportunities and development services for all people through education, technical assistance, and economic incentives.

G. Develop and implement employment programs to assist citizens with temporary and permanent employment.

H. Establish agreements with major employers to provide job training for Berkeley youth similar to the Bayer biotech agreements.

I. Strengthen and improve the administration and performance of the First Source Program, and establish better links between the First Source Program and the Office of Economic Development.

J. Consider development of an ordinance that requires that a percentage of Berkeley residents be hired for publicly funded construction jobs.52

The Berkeley General Plan Economic Development and Employment Element Objectives provides the following City development objectives:

1. Provide a variety of jobs with varied skill levels for residents of Berkeley.

2. Promote community and neighborhood values.

3. Support businesses that are independent, locally owned, and neighborhood-serving.

4. Encourage environmentally sustainable business.

5. Promote revitalization in neighborhoods and communities that have historically higher-than-average rates of unemployment.

6. Promote a strong industrial base as a vital foundation of a stable economy.

7. Increase social and economic equity in land use decisions.

52 Berkeley General Plan Economic Development and Employment Element, Policy ED -1, pg. ED-5 (emphasis added).

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 62 of 75 ends
Page 225 of 263 ends
Page 391 ends

April 20, 2023

Page 13 ends

6031-009

8. Support culture and the arts in Berkeley.

9. Promote general retail businesses and a variety of cultural, recreational, entertainment, and public sector activities in the Downtown to ensure that the Downtown will remain a vital, attractive, and unifying center for the city.53
Policy ED-12 (Promoting Berkeley) requires the City to promote Berkeley as a location for appropriate busi
ness, visitor, and conference destination through
specific actions, including “[d]evelop, maintain, and distribute economic and demographic information pertaining to the Berkeley economy."54 Insofar as the Project does not i
nclude any commitment to provide
construction jobs to local Berkeley or East Bay residents and does not contribute to any apprenticeship or other construction job training programs, or healthcare expenditures, the Project fails to demonstrate consistency with these General Plan policies. Providing a local skilled and trained workforce would implement the policies laid out in the General Plan Economic Development and Employment Element, which the City enacted to promote the general welfare.

V. CONCLUSION
The design of this Project is inconsistent with the neighborhood due to its massing and inadequate parking. The Project must also be approved in full compliance with CEQA, which is necessary to inform the public about the Project’s effects on the environment, and to eliminate or substantially lessen all significant effects on the environment where feasible. To adequately analyze and mitigate this Project’s potentially significant environmental impacts, the City should require an EIR to be prepared for this Project. Without providing local construction workforce standards, the Project is also inconsistent with workforce goals of the General Plan’s Economic Element, and is contrary to the general welfare.

This Project should not be recommended for approval until the City is presented with substantial evidence demonstrating that the Project will comply with CEQA, the zoning ordinance and General Plan.

Thank you for considering our comments. Please place this comment letter in the record of proceedings for this matter.
53 Berkeley General Plan Economic Development and Employment Element, Element Objectives, p g.

ED-5 (emphasis added).
54Id. at Policy ED-12(C), pg. ED-10.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 63 of 75 ends
Page 226 of 263 ends
Page 392 ends

April 20, 2023

Page 14 ends

6031-009

Sincerely,

Aidan P. Marshall

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 64 of 75 ends
Page 227 of 263 ends
Page 393 ends

To: City of Berkeley, Design Review Committee
Cc: Councilmember Kate Harrison, Mayor Arreguin, University Business Association From: David Ushijima
Date: April 11, 2023

Re: Apr. 20
th, DRC review of 1598 University Ave. project

The intersection of University and California Avenues is a key node along the major Western entrance to the city as identified in the University Ave. Strategic Plan. 1 That plan, which was
adopted by Council in 1997, was extensively developed with merchants and residents over several years. It emphasized the need to focus efforts on activating the key commercial nodes along University Ave, a corridor that has long suffered from lack of planning oversight and neglect.

I urge the DRC members to treat the review of 1598 University as a once-in-a- generation opportunity to improve what can be a vital mid-University Ave. corridor. Currently the project as submitted requires multiple improvements in the ground floor design in order to improve the quality of life not only in this mid- University Ave. community but along the major corridor leading to the Downtown district and UC Berkeley.

The five blocks along this stretch of University (beginning at the entrance to the Santa Fe/Ohlone pedestrian and bicycle path near Acton St., and proceeding East on University through the Sacramento St. intersection and then through the intersections at California St. and McGee Streets) currently are experiencing some of the highest retail vacancy rates in the city. (12.8% in 2022)2.

With the development of North Berkeley BART station and other new developments coming online, the city’s planners have a once-in-a-generation opportunity to influence new project designs and activate the key commercial nodes along this corridor in order to improve both the commercial and the neighborhood environments along University Ave. for generations to come.

The proposed project is also critically located on the most important bicycle and pedestrian pathway connecting the Western Downtown residential communities south of University and east of Sacramento St. to the Ohlone Greenway and the North Berkeley BART station. The entire East side side of the project will front the major bicycle boulevard (California St.) that is a key part of Berkeley’s Bicycle/Pedestrian plan

3. The California St. Bicycle Boulevard also is a

1 University Ave. Strategic Plan:
https://berkeleyca.gov/your-government/our-work/adopted-plans/university-avenue-strategic-plan 2 https://www.berkeleyside.org/2023/04/07/shop-talk-barberella-inspired-hair-salon-has-moved 3 https://berkeleyca.gov/your-government/our-work/adopted-plans/berkeley-bicycle-plan ;

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 65 of 75 ends
Page 228 of 263 ends
Page 394 ends

key part of BART’s North Berkeley BART Access Plan and the Berkeley-El Cerrito Corridor Access Plan4. As such the streetscape along the California side of the project should be made more amenable to both pedestrian and bicycle travelers.

While this project is being portrayed by the developers and architects as encouraging community engagement and enriching the streetscape, in actuality, in terms of street level project design, it falls far short of that goal.

I urge the DRC members to require ground-level improvements to the proposed design which will improve, activate, and enhance the surrounding streetscape, community, and key commercial node located near the corner of University Ave. and California Street. The building’s ground floor design should be revised to be more welcoming and accommodating to both pedestrian foot traffic and bicycle and other multi-modal forms of transportation.

In looking at the proposed plans as submitted to the DRC, I urge the DRC to consider the following improvements:

• The public art that is portrayed on the East-facing wall (Dwg. A0.0, A 3.1) needs to be re-thought. It was not selected with any input from the residential and retail community. None of the nearly 100 signees of the 1598 University Ave. neighborhood petition likes the artwork that is illustrated in the drawings.

• The narrow “on-site public plaza area” shown along the north-east side of the building in the Ground Level Floor Plan (Dwg. A.1), should be widened and extended.

It is far too narrow to benefit passing pedestrians. If possible, the sidewalk along this side should be widened to encourage pedestrian patronage of the proposed retail businesses.

Also a loading zone that has been positioned to block the northeast corner of that plaza area should be moved, as it will discourage any casual gathering of neighbors and community members at that key corner of the building.

• While the ground-level columns on the East and North sides of the building are shown covered with ivy or other vine-like plant growth to enhance the green appearance of the street-level façade (Dwg. A 0.0, A 3.9, Dwg MAT), the Landscape Site Plan (Dwg. L 2.0) or the plant list does not include the requirement for vine-like plants.

The vine-like plants should be a requirement.

• Both the California St. and University Ave. ground level frontages are shown as having tenant-supplied movable tables and chairs for seating (Conceptual Rendering Dwg. A

3.9). To avoid having streetside seating being solely dependant on securing a restaurant

4 www.bart.gov/beccap

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 66 of 75 ends
Page 229 of 263 ends
Page 395 ends

tenant for the retail space, permanent built-in bench seating should be built along the street frontage similar to that used in the interior courtyard. While extensive attention is paid to the interior courtyard for residents, equal attention should be given to the streetscape seating which will affect the entire community.

• The street trees along the University Ave. frontage of the building which are labeled on the Ground Level Floor Plan “to be determined by survey, city forester, and project landscape architect” (Dwg. A 2.1) need to be specifically selected to create a rich, green streetscape environment friendly to pedestrians and bicyclists.

• The existing trees that are illustrated on the East elevation (Dwgs. A3.1, A3.8, A3.9) and the North elevation (Dwg. A3.2) are not adequate to provide shade or attractive greenery to the pedestrians and bicyclists traveling along California St. or University.

The Landscape Site Plan (Dwg. L 2.0) calls for the “existing Crepe Myrtles” on California St. to be protected. However those trees are deciduous and do not provide a rich, green streetscape all year round, nor do they provide shade or shelter to pedestrians along the sidewalk. They should be replaced with taller, fuller evergreen perennial trees that provide a much richer, more welcoming streetscape environment.

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 67 of 75 ends
Page 230 of 263 ends
Page 396 ends

5/8/23, 3:56 PM Petition · Let’s Welcome New Neighbors, Not New Towers! · Change.org file:///C:/Users/klapira/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/BJ90VN3Q/Petition - Lets Welcome New Neighbors Not New To… 1/5 Skip to main content
Start a petition
My petitions
Browse
Membership
Welcome back to Change.org! A new petition wins every hour thanks to signers like you.

What’s new
Petition details
Comments
Updates
Discover
Let’s Welcome New Neighbors, Not New Towers!
88 have signed. Let’s get to 100!
At 100 signatures, this petition is more likely to be featured in recommendations!
At 100 signatures, this petition is more likely to be featured in recommendations! Recent signers
Barbara Loften signed this petition
laurel hunter signed this petition
California Street at University Avenue Neighbors started this petition Take the next step!
SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 68 of 75 ends
Page 231 of 263 ends
Page 397 ends

5/8/23, 3:56 PM Petition · Let’s Welcome New Neighbors, Not New Towers! · Change.org file:///C:/Users/klapira/AppData/Local/Microsoft/Windows/INetCache/Content.Outlook/BJ90VN3Q/Petition - Lets Welcome New Neighbors Not New To… 2/5

Say NO to a 210-Unit Tower at 1598 University; tell the City we don't want 8-story buildings lining University Avenue, overwhelming neighborhoods!
A private developer—already applying for permits to build more Towers abutting Berkeley neighborhoods—has asked the City to approve an 8-story, 210-unit tower on the SW corner of University and California.

Let’s put the needs of neighborhoods rst, not the needs of developers! The building would be much taller than anything in this part of the city:

Numbers are building over 3 stories:  Green are existing, Red is this proposed one.

Parking Crisis: Only 36 spaces provided for 245 bedrooms!!  A major hardship for seniors and neighbors with disabilities.  This will have a severe impact on the neighborhood!  A trac safety concern for neighbors, nearby churches and schools, and kids playing in the street.

Unfair Shadowing: This building will block sunlight on surrounding homes, yards, and solar panels for hours daily.  Tell the City Council to agree on objective shadowing standards that would give neighborhoods a voice on new state mandates!  Councilmembers are willfully avoiding this; tell them our vote depends on it!  Sunlight is crucial for healthy living things.

Lack of Aordable Housing: 90% of units will be high-priced market-rate!  We don’t need another Tower , what we need is more aordable housing to protect and re-build the diversity of our historic neighborhood and meet the needs of current and new residents! Who to contact, NOW—don't wait, comments needed ASAP!
Contact Katrina Lapira in the City Planning Department:

[email protected] , 510-981-
7488, 1947 Center Street, 2nd Floor , Berkeley, CA 94704 Contact Councilmember Kate Harrison: [email protected] Ask that "1598 University Avenue" be redesigned to preserve solar access and neighborhood life.

Mailing list for organizing opposition to this building:  To subscribe, if you have a Google account, go to https://groups.google.com/d/forum/1598universitytower and click on "Ask to join group". (If you're not oered "Ask to join group" but are oered "For access, try logging in" click that to log in to Google, after which you should see "Ask to join group").  If you want to subscribe but also want to not have a Google account (which means you will receive emails but won't be able to use the Web interface to the 1598universitytower forum), please send an email to
[email protected] with a Subject Line like "1598universitytower Subscribe Request" from the email address you wish to subscribe.

This yer is endorsed by Friends of 1598 University Tower Neighbors, [email protected] the next step! SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 69 of 75 ends
Page 232 of 263 ends
Page 398 ends

Name City State Postal Code Country Signed On
California Street at University Avenue Neighbors

US 2022-07-
29 Mark Van Valkenburgh Berkeley CA 94703 US 2022-08-
06 Judy Caldeira Elk Grove CA 95624 US 2022-08-
06 Bill Kristy Berkeley CA 94703 US 2022-08-
07 Kevis Goodman Berkeley CA 94703 US 2022-08-
09 M.E. Lawrence Berkeley CA 94710 US 2022-08-
10 Nancy Richerson Berkeley CA 94702 US 2022-08-
13 Mahalakshmi Parameswaran BERKELEY CA 94703 US 2022-08- 13 Bentley Drake Gualala CA 95445 US 2022-08-
13 Keshav Lincoln Annapolis

21401 US 2022-08-
13 Shelbi Lane Dallas

75270 US 2022-08-
14 Sydni Cutburth Belton

64012 US 2022-08-
14 Lillian Holtgrave Springfield

62702 US 2022-08-
14 Demontez Stimage Hammond

70401 US 2022-08-
14 Thomas Wood Berkeley CA 94703 US 2022-08-
14 Ruth Dart Berkeley CA 94703 US 2022-08-
14 Lucia Rodriguez Berkeley CA 94703 US 2022-08-
15 Laura Brainard Inverness CA 94937 US 2022-08-
21 ed valenzuela Berkeley CA 94702 US 2022-08-
26 Roberto Miranda Berkeley CA 94703 US 2022-08-
26 Kiki Calenzuela Berkeley CA 94703 US 2022-08-
26 Mary Richerson Berkeley CA 94702 US 2022-08-
26 kathleen richerson Alameda CA 94501 US 2022-08-
27 SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 70 of 75 ends
Page 233 of 263 ends
Page 399 ends

David Ushijima Berkeley CA 94703 US 2022-08-
27 Barbara Shayesteh Berkeley CA 94702 US 2022-08-
27 Elizabeth Arenas Berkeley CA 94707 US 2022-08-
27 Cheryl Chinn Berkeley CA 94702 US 2022-08-
28 Wanie Biggs Berkeley CA 94702 US 2022-08-
28 Linda Banks Bellmawr

8031 US 2022-08-
28 Adam Kaluba Burleson

76028 US 2022-08-
28 Laurie Rolfe Berkeley CA 94703 US 2022-09-
08 Daisy White Michigan City

46360 US 2022-09-
08 anet Daniel

US 2022-09-
08 Kalvin Yuwen

US 2022-09-
08 Alejandro Beltran Lubbock

79414 US 2022-09-
08 Tobie Lurie Berkeley CA 94702 US 2022-10-
14 Charlene Woodcock Berkeley CA 94709 US 2022-10-
14 Harvey Smith Berkeley CA 94703 US 2022-10-
14 Marcia Poole Berkeley CA 94703 US 2022-10-
14 Isabelle Gaston Berkeley CA 94707 US 2022-10-
14 Barbara Fisher Berkeley CA 94702 US 2022-10-
14 Art Goldberg Carmel-by-the-
Sea
CA 93923 US 2022-10-
14 Larisa Cummings Berkeley CA 94703 US 2022-10-
21 Aurora Maramag Berkeley CA 94703 US 2022-10-
29 Margaret Fauchier Berkeley CA 94703 US 2022-10-
29 Elizabeth Kowal Berkeley CA 94703 US 2022-11-
01 Jose Ramirez Berkeley CA 94703 US 2022-11-
02 SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 71 of 75 ends
Page 234 of 263 ends
Page 400 ends

Jeanette Badal Berkeley CA 94703 US 2022-11-
04 Zhen Yang Berkeley CA 94703 US 2022-11-
05 Cymbre Potter Berkeley CA 94702 US 2022-11-
14 John Ruiz Berkeley CA 94702 US 2022-11-
14 Serina Garst Berkeley CA 94703 US 2022-11-
16 Erica Garcia Lancaster

93535 US 2022-11-
16 Trista Thomas Lexington

60629 US 2022-11-
16 Summer Brenner Berkeley CA 94703 US 2022-11-
16 Anne-Lise Francois Berkeley CA 94703 US 2022-11-
16 lynn adler Berkeley CA 94708 US 2022-11-
16 Susan Moon Berkeley CA 94707 US 2022-11-
16 M.I. Lawrence-Smail Berkeley CA 94703 US 2022-11-
16 Michael Weber Berkeley CA 94703 US 2022-11-
16 nora shourd berkeley CA 94703 US 2022-11-
16 Marilyn Mulford Berkeley CA 94703 US 2022-11-
16 Melissa Riley berkeley CA 94703 US 2022-11-
17 Ivan Avila Modesto

95354 US 2022-11-
17 Lois Yuen Berkeley CA 94707 US 2022-11-
17 Julian Amado Berkeley CA 94703 US 2022-11-
17 Deon Jackson Ta

33603 US 2022-11-
17 Taha Saffarniya Dallas

75270 US 2022-11-
17 Rick Adams Cincinnati

45211 US 2022-11-
17 Steven M Brandon

39047 US 2022-11-
17 Aidan VanDuyne Channahon

60410 US 2022-11-
17 SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 72 of 75 ends
Page 235 of 263 ends
Page 401 ends

Alana Shindler Berkeley CA 94705 US 2022-11-
17 Shirley Carrie Brewin Berkeley CA 94704 US 2022-11-
17 Antonia Langenhoff Berkeley CA 94703 US 2022-11-
18 Nicholas Phelps Berkeley CA 94702 US 2022-11-
20 Ariel H California CA 94702 US 2022-11-
21 James Whitta Berkeley CA 94703 US 2022-11-
23 Richard Graham Berkeley CA 94707 US 2022-12-
09 Gregory Williams Memphis

38126 US 2022-12-
09 Sooo Hey Clifton

7014 US 2022-12-
09 Ryan Thacker Beckley

25801 US 2022-12-
09 Foresha Benton Rochester

14610 US 2022-12-
09 Michal Elnadav Brooklyn

11230 US 2023-02-
05 G. Diane Matthews-Marcelin Carson

90746 US 2023-03-
14 laurel hunter san francisco CA 94111 US 2023-04-
05 Barbara Loften Berkeley CA 94703 US 2023-04-
05 Nina Fairles Berkeley CA 94707 US 2023-04-
05 Susan Korbel Berkeley CA 94703 US 2023-04-
06 SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 73 of 75 ends
Page 236 of 263 ends
Page 402 ends

Name City State
Postal
Code Country
Commented
Date Comment
Charlene
Woodcock Berkeley CA 94709 US 10/14/22
"This building is too tall
for its context and it will
hinder rooftop solar,
which should be
encouraged all over
Berkeley. Thanks to for-
profit developers, the
cost of housing is rising
fast in Berkeley and they
refuse to provide 50%
low income units. We
now have wind tunnels
downtown, so that
developers can increase
their profits by building
too-tall buildings."
Harvey
Smith Berkeley CA 94703 US 10/14/22
"we need social housing,
cooperative housing,
affordable housing, not
more market-rate
development that
primarily benefits the real
estate and development
industry. NO to trickle-
down housing."
Elizabeth
Kowal Berkeley CA 94703 US 11/1/22
"This neighborhood
deserves new housing
that benefits current and
new residents and helps
keep it DIVERSE!"
Serina
Garst Berkeley CA 94707 US 11/16/22
"There are so many new
high rise buildings already
approved or under
construction. Meanwhile,
the tech economy that
has driven bay area
housing for the last
decade is shrinking and
the real estate market is
cooling off. It seems and
odd time to approve even
more rental housing -
especially housing that is
not affordable."
Summer
Brenner Berkeley CA 94703 US 11/17/22
"Berkeley needs
AFFORDABLE housing,
not luxury towers."
nora
shourd berkeley CA 94703 US 11/17/22
"This does not solve our
housing issues; it’s a kind
of urban blight; blocking
the sun; creating more
pollution and traffic .

Who wants this “new
Berkeley”? We need to
repurpose preexisting
SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 74 of 75 ends
Page 237 of 263 ends
Page 403 ends

buildings ; stop more and
more resource extraction
and landfill waste . House
the citizens of Berkeley
that need it"
Melissa
Riley berkeley CA 94703 US 11/17/22
"8 stories is too much. It’s
not at a human
scale, with eyes on the
street, for this
neighborhood. We need
more shorter buildings.

And we need truly
affordable housing. Not
vastly market rate."

SUPPLEMENTAL ITEM #4 - 1598 UNIVERSITY AVE.

ZAB 05-11-2023

Page 75 of 75 ends
Page 238 of 263 ends
Page 404 ends

Z ONING

A DJUSTMENT S
B OARD
Staff Report
1947 Center Street, Berkeley, CA 94704 Tel:
510.981.7410 TDD: 510.981.7474 Fax: 510.981.7420
E-mail: [email protected]

FOR BOARD ACTION
MAY 11, 2023
1598 University Avenue
Use Permit #ZP2022-0099 to demolish anon-residential structure and construct a 127,492 square-foot, eight-story (89 feet- 2 inches) mixed-use residential building containing 207 dwelling units (21 Very Low-Income) and 5,943 square foot commercial space, with 39 automobile parking spaces and 92 bicycle parking spaces, utilizing State Density Bonus.

I. Background
A. Land Use Des
ignations:
• General Plan: Avenue Commercial (AC)
• Zoning: University Commercial District (C-U), Node Area – South Side of University Avenue
• Specific Plan: University Avenue Specific Plan
B. Zoning Permits Required:
• Use Permit to demolish two non-resi
dential buildings, under Berkeley Municipal
Code (BMC) Section 23.326.070
• Use Permit to establish a mixed-use residential building, under BMC Section

23.204.020
• Use Permit to create 5,000 square feet of new floor area in the University Commercial District, under BMC Section 23.204.030(A)
• Use Permit to establish residential uses on the ground floor, under BMC

23.204.060(B)(3)
• Use Permit to reduce the rear setback (interior) to provide greater privacy along the side setback (south) that abuts residential district, under BMC 23204.060 • Administrative Use Permit Administrative Use Permit for projections that exceed the maximum building height limit, under 23.304.050(A) C. Concessions and Waivers – Pursuant to State Density Bonus Law (CA Gov’t C
ode Section 65915)
• Concession to allow for a reduction in open space to 10,365 sq uare feet, where
41,400 square feet is required under BMC Section 23.204.060(D)(1) ITEM #4
ZAB 05-11-2023
Attachment 5

Page 239 of 263 ends
Page 405 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 2 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
• Waiver to reduce the ground floor commercial use feature street frontage along University Avenue from 75 percent to 31.8 percent, under BMC Section

23.204.060(D)(6)
• Waiver to reduce the minimum ground floor area for a commercial use feature from 20 percent to 19.8 percent, under 23.204.060 (D)(6) • Waiver to increase the building height to 89’-2 where the requirement is 48’ under BMC Section 23.204.060(D)(1)
• Waiver to increase the number of stories to eight where the maximum is four under BMC Section 23.204.060(D)(1)
• Waiver to increase the FAR to 4.47, where the maximum is 3 under BMC Section

23.204.060(D)(1)
• Waiver to reduce the rear setback to a 5-foot average where the requirement is a 20-foot average, under BMC Section 23.204.060(D)(1)
• Waiver to reduce the side setback (University) to 0 feet where the requirement is a 2-foot average, under 23.204.060(D)(1)

D. CEQA Recommendation: It is staff’s recommendation to the Zoning Adjustments Board (ZAB) that the project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA, Public Resources Code Section 21000, et seq. and California Code of Regulations, Section15000, et seq.) pursuant to Section 15332 of the CEQA Guidelines (“Infill Development Project”).

A. Parties Involved:
• Applicant Isaiah Stackhouse, Trachtenberg Architects, Berkeley CA • Property Owner 1598 University Avenue, LLC, Berkeley CA

ITEM #4
ZAB 05-11-2023

Page 240 of 263 ends
Page 406 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 3 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
Figure 1: Vicinity Map

*Map not to scale.

Map Key
C-U : University Commercial District
R-2: Restricted Two-Family Residential District
R-2A : Restricted Mulitple-Family Residential District
R-4 : Multi-Family Residential District
Project Site
ITEM #4
ZAB 05-11-2023

Page 241 of 263 ends
Page 407 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 4 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
Figure 2: Site Plan

Figure 3: North Elevation (facing University)

ITEM #4
ZAB 05-11-2023

Page 242 of 263 ends
Page 408 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 5 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
Figure 4: East Elevation

Figure 5: West Elevation

ITEM #4
ZAB 05-11-2023

Page 243 of 263 ends
Page 409 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 6 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
Figure 5: South Elevation

ITEM #4
ZAB 05-11-2023

Page 244 of 263 ends
Page 410 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 7 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
Table 1: Land Use Information
Location Existing Use Zoning
District General Plan Designation
Subject Properties
Restaurant
(commercial); Chinese
language school (group
class instruction)
C-U University Avenue
Surrounding
Properties
North
Mixed-use building
(residential- commercial)
West Multifamily building
East Thrift store
(commercial)
South
(Rear) Duplex R-2 Low Medium Density Residential

Table 2: Special Characteristics
Characteristic
Applies
to
Project?
Explanation
Affordable Child Care Fee for
qualifying non-residential projects
(Per Resolution 66,618-N.S.)
No This fee applies to net new nonresidential floor
area over 7,500 square feet. The proposed project
is provides 5,943 square feet of commercial space
and is therefore not subject to this requirement.

Affordable Housing Fee for qualifying
non-residential projects (Per
Resolution 66,617-N.S.)
No
Affordable Housing Mitigations for
rental housing projects (Per BMC

22.20.065
1)
Yes
Project would provide 21 Below Market Rate
(BMR) units at the Very Low-Income (VLI) rate,
and pay a fee to satisfy the requirements of BMC
Section 22.20.065 (See discussion below).

Creeks No The site is not near a mapped creek or a creek culvert.

Density Bonus Yes The proposed project qualifies for a 50% density bonus under State Density Bonus law.

Historic Resources No
The existing building is more than 40 years old.

Given its age, the project was forwarded to the
Landmarks Preservation Commission (LPC) for
review (BMC Section 23.326.070(C)). On
February 2, 2022 the LPC took no action to initiate
a Landmark or Structure of Merit designation and
recommended that the ZAB approve the
demolition. See Section IV.B for discussion.

Housing Accountability Act (Gov’t
Code Section 65589.5(j)) Yes
The project is a mixed-use development in which
at least two-thirds of the square footage is
designated for residential use and meets the
definition of a “Housing Development Project” per
Government Code Section 65589.5(h)(2)

2. The
base project also meets the criteria for a housing
development project and complies with applicable,
objective general plan and zoning standards, and
thus section (j) of the Housing Accountability Act

1 Project vested under SB 330 prior to effective date of new inclusionary housing requirements. 2 Government Code Section 65589.5(h)(2) “Housing development project” means a use consisting of any of the following: (A) residential units only, (B) mixed-use developments consisting of residential and nonresidential uses in which at least two-thirds of the square footage is designated for residential use, and (C) transitional or supportive housing.

ITEM #4
ZAB 05-11-2023

Page 245 of 263 ends
Page 411 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 8 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
applies and the project cannot be denied at the
density proposed unless the findings for denial can
be made. See Section V.B of this report for
additional discussion on compliance with the
Housing Accountability Act.

Housing Crisis Act of 2019 (SB 330)
The project is a mixed-use project with at least
two-thirds of the square-footage residential. See
Section V of this report for additional discussion on
the sections of SB330 that apply to the project.

Natural Gas Prohibition
(Per BMC 12.80.020) Yes
This project is an application for new construction
and was submitted after January 1, 2020, and is
therefore subject to the Natural Gas Prohibition.

Oak Trees No There are no Coast Live Oak trees on the project site.

Rent Controlled Units No There are no existing residential units on the site.

Residential Preferred Parking (RPP) No
The project is not eligible for RPP permits per
BMC Section 14.72.080(C)(1) as no permits shall
be issued to residents in newly constructed
residential units.

Seismic Hazards (SHMA) No The site is not located in a landslide/ liquefaction/ fault zone.

Soil/Groundwater Contamination No
The project site is not listed on the Cortese List (an
annually updated list of hazardous materials sites).

The project site is within the City’s Environmental
Management Area. The applicant has submitted a
Phase I report. No further investigation is
recommended. Standard Conditions of Approval
related to hazardous materials would apply.

Transit Yes
The site is located at the intersection of University
Avenue and California Street. University Avenue is
serviced by Alameda-Contra Costa Transit District
(AC) Transit Lines 51B, 52, 88, 604 67, and 800.

The site is also located less than half a mile from
the North Berkeley BART Station and over a mile
from the Downtown Berkeley BART Station.

Additionally, there is a Bay Wheels station
adjacent to the site, along the eastern property line
within the public-right-of-way.

ITEM #4
ZAB 05-11-2023

Page 246 of 263 ends
Page 412 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 9 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
Table 3: Project Chronology
Date Action
January 26, 2022 SB 330 complete preliminary housing development project application submitted and deemed complete
July 7, 2022 SB 330 Use Permit Application submitted
August 24, 2022 Application deemed incomplete
September 22, 2022 Application resubmitted
October 20, 2022 Application deemed incomplete
November 1, 2022 Application resubmitted
December 1, 2022 Application deemed incomplete
December 23, 2022 Application resubmitted
January 23, 2023 Application deemed complete
February 2, 2023 LPC hearing
April 20, 2023 DRC hearing
May 3, 2023 Plans Resubmitted
May 4, 2023 Public hearing notices mailed/posted
May 11, 2023 ZAB hearing

Table 4: Development Standards
Standard
BMC Sections 23.204.020
Existing Proposed
Total
Permitted/
Required
Lot Area (sq. ft.) 28,936 No change 5,000 min
Gross Floor Area (sq. ft.) 7,884 127,492 N/A
Floor Area Ratio 0.27 4.63 3 max
Dwelling Units Total 0 207 N/A
Affordable 0 21 21 min
Building
Height

Minimum /
Maximum (ft.)
26’ 89’-2” 30’ min /
48’ max
Stories 1 8 2 min / 4 max
Building
Setbacks (ft.)
Front
(California)
1’-7” 5’-8” avg. 0 min
Rear 3’-10” 5’ avg. 20’ avg. min
Left Side
(University)
2’-10” 0’ 2’ avg.

Right Side

15’ 57’-1” avg. 0 min
ITEM #4
ZAB 05-11-2023

Page 247 of 263 ends
Page 413 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 10 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
Lot Coverage (%) 27 63 100 max
Usable Open Space (sq. ft.) N/A 10,365 41,400 min
Parking Automobile 33 39 0 min3
Bicycle 0 92 92 min
UASP Commercial Area (%) 100 21 30 min
UASP Commercial Area (sq. ft) 7,884 5,943 5,787 min
UASP Commercial Frontage Along
University Avenue (%)
N/A 31.8 75 min
UASP Open Space Entry (%) 10 10 10 min
UASP Pedestrian Open Space (%) N/A 3 1 min
________ = Waiver or Concession requested to modify the district standard Abbreviations: sq. ft. = square feet; max. = maximum; min. = minimum; n/a = not applicable; % = percent avg. = average; UASP = University Avenue Specific Plan (node)

II. Project Setting

A. Neighborhood/Area Description: University Avenue is situated between West Berkeley and Downtown Berkeley – regional commercial centers. The project site is located within the University Avenue Specific Plan (UASP)4 area in a local -serving avenue node with existing neighborhood services . The project site is located at the corner of University Avenue and California Street , two blocks south of Ohlone Park .

The project site located at an intersection that that is composed of one to three story mixed use and commercial buildings and associated surface parking . Compared to both the eastern and western ends of the UASP plan area, the site is located within an underdeveloped section of the plan area. The rear of the site abuts a residential district which is characterized by single-family, two-family, and multifamily residential buildings. The site project site is proximate to several bus lines and is within half a mile of the North Berkeley Bart Station.

B. Site Conditions: The project site spans three rectangular, contiguous lots. The 28,936 square foot site maintains about 180 feet of frontage along University Avenue and about 138 feet of frontage along California Street. The western portion of the site area is partially developed with a Chinese language school and the eastern portion of the lot with a restaurant. The majority of the site is dedicated to off-street surface parking.

The site is accessed along University Avenue at three separate curb cuts and at one curb cut along California street.

3 AB-2097, effective January 1, 2023, prohibits local jurisdictions from requiring minimum parking for most non - residential uses
4 University Avenue Specific Plan (1996)
ITEM #4
ZAB 05-11-2023

Page 248 of 263 ends
Page 414 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 11 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
III. Project Description

A. Proposed Project: The proposed project would demolish an existing commercial building and construct a new eight-story residential building with the following primary components:

1) 207 dwelling units (38 two-bedroom, 20 one-bedroom, and 149 studios) for a total of 245 bedrooms
2) 82 long-term bicycle parking spaces onsite and seven short-term spaces 3) 39 automobile parking spaces in a ground-level garage 4) 9, 165 square foot garden/ open space on the ground floor 5) Communal facilities on the ground floor (i.e. club room and fitness center) 6) Communal lounges and decks located on every other floor 7) 5,943 commercial floor area located along California Street and at the corner of University Avenue and California Street

B. Base Project and Density Bonus Project: The applicant has requested a density bonus under the State Density Bonus Law. Under the City’s density bonus procedures, the “base project”
5 includes 138 residential units and eight stories. By
providing 21 Very-Low Income (VLI) BMR units on site (15 percent of the 138-unit base density), the project is eligible for a 50 percent density bonus, or 69 units.

Therefore, the applicant proposes 69 additional units above the base density for a total of 207 dwelling units. The Density Bonus calculations are provided in more detail, below:

Table 5: Density Bonus
Base Project
Units* Qualifying Units Percent Density
Bonus
Number of Density
Bonus Units*
Proposed Project
Units
138 21 VLI
(15% of BP) 50% 69
(50%x138) 207
*Per Gov’t Code 65915(q), all unit calculations are rounded up to the nearest whole number.

Abbreviations: % = percent; BP = base project

IV. Community Discussion

A. Neighbor/Community Concerns: Prior to submitting this application to the city, the applicant invited interested neighborhood organizations as well as owners and occupants within 300 feet of the project to a project preview meeting. The meeting was held on March 30, 2022, and attended by 10 people (meeting minutes are included as Attachment 4).

Later, a pre-application poster was erected by the applicant in March 31, 2023. On April

5 Per the City’s Density Bonus Procedures (DBP), the Base Project is the largest project allowed on the site that is fully compliant with district development standards (i.e. height, setbacks, usable open space, parking, etc.), or, the maximum allowable density for the site. The City uses the DBP to calculate the maximum allowable density for a site where there is no density standard in the zoning district, and to determine the number of units in the Proposed Project, which is the number of B ase Project units plus the number of density bonus units that can be added according to the percentage of BMR units proposed, per Government Code, Section 65915(f).

ITEM #4
ZAB 05-11-2023

Page 249 of 263 ends
Page 415 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 12 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
27, 2023, the City mailed public hearing notices to property owners and occupants within 300 feet of the project site, and to interested neighborhood organizations , and the City posted notices within the neighborhood in three locations. At the time of this writing, staff has received several communications regarding the project. The majority of the communications expressed concerns about the project’s height (scale) and its potential impacts to sunlight, traffic, and parking. Some communications expressed support of the project, citing the need for more housing supply (Attachment 5).

B. Landmarks Preservation Commission (LPC): The project would demolish commercial buildings that are over 40 years in age. Per the Historic Resource Evaluation prepared by Page & Turnbull, Inc on May 2, 2022, the building proposed for demolition does not meet the criteria for the California Register or a City of Berkeley Landmark. Pursuant to BMC Section 23.326.070(C), the proposed demolition was referred to the LPC for review prior to the consideration of the Use Permit. The LPC reviewed the demolition referral on February 2, 2023, and took no action.

C. Design Review Committee: The project is located in the non- residential district and therefore, requires design review, pursuant to BMC Section 23.406.070(B)(1)(a). On April 20 , 2023, the Design Review Committee (DRC) reviewed the current project design for the project, gave a favorable recommendation on the design as presented, and provided the following conditions and recommendations for Final Design Review (FDR):

Conditions
• Refine Public Plaza on California.
• Resolve privacy and heat gain issues on south windows. • Resolve any sound issues in the courtyard and present at FDR. • Cornice and window shelves are too thin and should be further developed. • Consider mural relocation for better integration in the building design. • Consider an alternate material to the metal panels at FDR.

Recommendations
• Plaza should be wider, and better relate to the retail and sidewalk levels; recommend pushing the massing west and south to achieve this. • Consider more articulation at the ground floor storefront. • Consider reducing ceiling heights for the club and fitness rooms to reduce overall height/mass.
• Consider breaking the horizontal banding at the main entrance. • Look carefully at gate and garage door details.
• Recommend bird safe glazing wherever possible.
• Add more interest to color palette at FDR.
• Provide strong parapets on rear façade, including lower portions. • Consider different design accents – not so symmetrical and uniform.

ZAB Issues
ITEM #4
ZAB 05-11-2023

Page 250 of 263 ends
Page 416 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 13 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
• Consider live work units on south side of the California ground floor frontage.
• Photo documentation to be given to local historic societies.

V. Issues and Analysis

A. SB 330 – Housing Crisis Act of 2019: The Housing Crisis Act, also known as Senate Bill 330, seeks to boost homebuilding throughout the State with a focus on urbanized zones by expediting the approval process for and suspending or eliminating restrictions on housing development. Housing development is defined as a project that is residential units only, a mixed- use project with at least two- thirds of the square- footage residential, or for transitional or supportive housing. Sections of SB 330 that apply to the proposed project include the following:

1. Government Code §65905.5(a) states that if a proposed housing development project complies with the applicable, objective general plan and zoning standards in affect at the time an application is deemed complete, then the city shall not conduct more than five hearings in connection with the approval of that housing development project. This includes all public hearings in connection with the approval of the housing development project and any continuances of such public hearings. The city must consider and either approve or disapprove the project at any of the five hearings consistent with applicable timelines under the Permit Streamlining Act (Chapter 4.5 (commencing with §65920)).

The May 11, 2023 ZAB hearing represents the third public hearing for the proposed project since the project was deemed complete. The City can hold up to two additional public hearings on this project, if needed. One of those hearings must be reserved for any possible appeal to the City Council.

2. Government Code §65913.10(a) requires that the City determine whether the proposed development project site is a historic site at the time the application for the housing development project is deemed complete . The determination as to whether the parcel is a historic site must remain valid during the pendency of the housing development project, unless any archaeological, paleontological, or tribal cultural resources are encountered during any grading, site disturbance, or building alteration activities.

As discussed in an historic resource evaluation prepared for the property in May of 2022, the property does not appear to be historically significant and therefore is not eligible for listing on the California Register of Historical Resources or as a City of Berkeley Landmark or Structure of Merit. The demolition referral was heard at the February 2, 2023 Landmark Preservation Commission Agenda, and no action was taken. Therefore, it was determined the site is not a historic resource. Further, standard conditions of approval have been included to halt work in case of any unanticipated discovery of archeological, paleontological, or tribal cultural resources.

ITEM #4
ZAB 05-11-2023

Page 251 of 263 ends
Page 417 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 14 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx

3. Government Code §65950(a)(5) requires a public agency to approve or disapprove a project within 60 days from the determination that the project is exempt from the California Environmental Quality Act. The project was deemed complete on January 23, 202 3. Should ZAB determine the application is categorically exempt from CEQA at the May 11, 2023 public hearing, the application must be approved or disapproved by July 11, 2023.

B. Housing Accountability Act Analysis: Pursuant to the Housing Accountability Act (HAA), California Government Code Section 65589.5(j), when a proposed housing development complies with the applicable, objective general plan and zoning standards, but a local agency proposes to deny the project or approve it only if the density is reduced, the agency must base its decision on written findings supported by substantial evidence that:

1. The development would have a specific adverse impact on public health or safety unless disapproved, or approved at a lower density; and

2. There is no feasible method to satisfactorily mitigate or avoid the specific adverse impact, other than the disapproval, or approval at a lower density.

The Base Project includes Use Permits and/or Administrivia Use Permits to modify the use, floor area, height, and rear setback to comply with applicable, objective general plan and zoning standards. Further, Section 65589.5(j)(3) provides that a request for a density bonus “shall not constitute a valid basis on which to find a proposed housing development project is inconsistent, not in compliance, or not in conformity, with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision specified in this subdivision.” Therefore, the City may not deny the Base Project or density bonus request or reduced the density with respect to those units without basing its decision on the written findings under Section 65589.5(j), above.

Staff is aware of no specific adverse impacts that could occur with the construction of the Base Project or the density bonus units. All findings discussed below are subject to the requirements of Government Code Section 65589.5.

As described in Table 4 above, the project complies with the applicable general plan and zoning standards. While the project may include other Use Permits or Administrative Use Permits to modify standards not associated with the base project, there are no objective criteria in the findings. The ZAB still has the discretion to approve, deny or modify the request according to the zoning findings, provided the action does not reduce the project density or effectively deny the project by making it infeasible, unless the ZAB is also able to make the required findings for denial set forth under Section 65589.5(j), above.

C. Density Bonus Concessions and Waivers: The project is entitled to three concessions (or incentives) under Government Code Section 65915(d), and an unlimited number of waivers under Section 65915(e).

Concessions: A concession is a modification of a development standard that reduces
the cost of providing affordable housing. The applicant is requesting the following ITEM #4
ZAB 05-11-2023

Page 252 of 263 ends
Page 418 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 15 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
concessions from regulatory measures that result in identifiable and actual cost reductions:

• T o allow for a reduction in open space provided to 10,365 square feet, where the requirement is 41,400 square feet under BMC Section 23.204.060(D)(1)

The City may only deny the concession if it finds that the concession would have a specific adverse impact upon public health and safety, or the physical environment, or on any real property listed in the California Register of Historical Resources, and there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact without rendering the development unaffordable to low-income, very-low income, and moderate-income households, or if the concession would be contrary to State or Federal law. Staff believes such a finding cannot be made.

Waivers: A waiver is a modification of a development standard that would otherwise physically preclude the construction of the project with the permitted density bonus and concessions. The applicant is requesting eight waivers from the following development standards shown in the table below:

• Waiver to reduce the
ground floor commercial use feature street frontage along University Avenue from 75 percent to 31.8 percent, under BMC Section

23.204.060(D)(6)
• Waiver to reduce the minimum ground floor area for a commercial use feature from 20 percent to 19.8 percent, under 23.204.060 (D)(6) • Waiver to increase the building height to 89’-2 where the requirement is 48’ under BMC Section 23.204.060(D)(1)
• Waiver to increase the number of stories to eight where the maximum is four under BMC Section 23.204.060(D)(1)
• Waiver to increase the FAR to 4.47, where the maximum is 3 under BMC Section

23.204.060(D)(1)
• Waiver to reduce the rear setback to a 5-foot average where the requirement is a 20-foot average, under BMC Section 23.204.060(D)(1)
• Waiver to reduce the side setback (University) to 0 feet where the requirement is a 2-foot average, under 23.204.060(D)(1)
• Waiver to reduce the side setback (University) to 0 feet where the requirement is a 2-foot average, under 23.204.060(D)(1)

VI. Other Considerations
The project is consistent with the following 2002 General Plan and UASP goals and policies.

This information is provided for informational purposes only, to provide context. They are not required because the proposed project is HAA-compliant.

A. Demolition of Non-Residential Buildings: Pursuant to BMC Section 23.326.070 the demolition of main non- residential buildings may be demolished provided that the demolition will not be materially detrimental to the commercial needs of the impacted neighborhood and if the demolition is required to allow a proposed new building ITEM #4
ZAB 05-11-2023

Page 253 of 263 ends
Page 419 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 16 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
amongst other findings. Staff finds that the proposed demolition of the existing non- residential buildings will not be detrimental needs of the neighborhood, as the project redevelops underdeveloped lots that are primarily used for surface parking with a new mixed-use building, with ground floor commercial that is compatible with existing development patterns along University Avenue. Staff finds that the project is aligned with the UASP goals and district’s objectives to promote appropriate new mixed- use infill development that is compatible with the commercial and residential areas within C-U district.

E. General Non-Detriment Findings: As required by BMC Section 23.406.040(E), the Zoning Adjustments Board (ZAB) must find that the proposed structure will not be detrimental to the health, safety, peace, morals, comfort, or general welfare of persons and adjacent properties for any Use Permit in the C-U.

1) The project is a higher-density development in proximity to entitled and in- progr
ess mixed uses of a comparable density along University Avenue, transit, commercial districts, and amenities that is compatible with the purposes of the zoning district and the surrounding uses and buildings. The project site is located within the C-U commercial district, within the UASP. The project provides 207 new dwelling units sized from studios to two-bedroom units.

Twenty-one of the units will be restricted as affordable housing units for very- low-income residents. Over 5,000 square feet of commercial space will be provided along California Street, accompanied by a pedestrian oriented on-site public plaza. The proposal also includes a 10,365 square foot open space feature at the ground floor. The ground floor also includes residential amenities like a club room, fitness center, and long-term bicycle parking room. The project site is well served by public transportation, with several AC transit bus stops along University Avenue, BART within a half-mile, and several bicycle share kiosks within a half-mile radius. The project adds additional dwelling units, new commercial floor area, and an at-grade garden on the ground floor, furthering the mixed-use uses that are compatible purposes of the district and not detrimental to neighborhood-serving commercial uses.

2) Shadows: According to the shadow studies submitted for the project (see plans,

Attachment 1), new shadows would be cast on existing residential and commercial buildings throughout the year. During the summer months new shadows will shade existing residential units to the west, south, and east of the project (1632 University Avenue, 2091 California Street, 2020 California Street, 1543 Addison Street, 1537 Addison Street, 1528 University Avenue, and 1530 University Avenue). New shadows shall also be cast existing residential units north and west (1597 Univ ersity Avenue, 1587 University Avenue, 1535 University Avenue, and 1530 University Avenue) of the project during the winter months. These changes in sunlight pattern are found to be reasonable given the orientation of these properties in relation to the subject building and their close proximity given the urban residential environment. These affects are not found to be detrimental because limited in duration and will not persist for extended periods throughout the year.

ITEM #4
ZAB 05-11-2023

Page 254 of 263 ends
Page 420 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 17 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
Shadow impact on adjacent dwellings are to be expected, because the subject site is located in the C -U district, which allows heights of up to 48 feet without a use permit and roof top projections beyond the base height with an administrative use permit. The additional height above the district limits would cast shadows in the affected directions further than if the project were limited to the base district height standards. Staff believes that shadow impacts from the project would be reasonable and not detrimental.
3) Also, the project is subject to the City’s standard conditions of approval regarding construction noise and air quality, waste diversion, toxics, and stormwater requirements, thereby ensuring the project would not be detrimental to the health, safety, peace, morals, comfort or general welfare of persons residing or working in the area or neighborhood of such proposed use or be detrimental or injurious to property and improvements of the adjacent properties, the surrounding area or neighborhood or to the general welfare of the City.

B. C- U Specific Findings: As required by 23.204.060(E), to approve a Use Permit for a project in the C -U district, the ZAB must find that the proposed use or structure is compatible with the purpose of the district, the surrounding uses and buildings, and does not interfere with the continuity of retail and service facilities at the ground level.

The project infills an underutilized site with a mixed- use building with ground floor commercial space fronting California Street, residential services (i.e. leasing office, lobby, bike storage, fitness center, club room) on the ground floor along University, and 207 dwelling units on the upper floors. The project is consistent with the UASP and C-U district as it would revitalize the corridor with additional housing and creates a service -oriented and commercial street -wall along both University Avenue and California Street. With respect to the existing residential uses that abut the rear of the site, the project breaks down the massing by including an open- air courtyard on the ground floor, which results in a rear average setback of 57 feet, and stepping back the building with balconies at floors seven and eight.

C. Reduction of Rear Setback: BMC Section 23.204.060 requires a Use Permit for the reduction of rear setback within a commercial district, provided that the reduction enhances privacy or improved amenities in the Residential District. In the Base Project, the rear setback (interior) is reduced from a 20- foot average to 0 feet. This reduction allows for the massing of the building to move away from the Southern property line and results in 20- foot average setback that confronts the R2- A district.

The reduction also allows for more useable open space on the ground floor, a residential amenity. Generally, this reduction improves privacy along the southern property line, between the commercial and residential districts.

D. Rooftop Projections: BMC Section 23.304.050(A) requires an Admini strative Use Permit for roof -top projections, such as mechanical penthouses, elevator equipment rooms or stair towers, that would exceed the maximum height limit. Such projections are limited to no more than 15 percent of the average floor area of all of the building’s floors, and cannot be used as habitable space or for commercial purposes. The project proposes a staircase/elevator penthouse, totaling 571 square feet that extends 5 feet ITEM #4
ZAB 05-11-2023

Page 255 of 263 ends
Page 421 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 18 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
6 inches over 89-foot- 2 inches -maximum height. The penthouse represents about

3.4 percent of the 16,756-square-foot average of all the floor areas. The projection is, therefore, permissible.

E. General Plan Consistency: The 2002 General Plan contains several policies applicable to the project, including the following:

1. Policy LU- 3 – Infill Development: Encourage infill development that is architecturally and environmentally sensitive, embodies principles of sustainable planning and construction, and is compatible with neighboring land uses and architectural design and scale.

2. Policy H-33 – Regional Housing Needs: Encourage housing production adequate to meet City needs and the City’s share of regional housing needs.

3. Policy LU- 7 – Neighborhood Quality of Life, Action A: Require that new development be consistent with zoning standards and compatible with the scale, historic character, and surrounding uses in the area.

4. Policy H-12 – Transit-Oriented New Construction: E ncourage construction of new medium- and high-density housing on major transit corridors and in proximity to transit stations consistent with zoning, applicable area plans, design review guidelines, and the Climate Action Plan.

5. Policy T-16 – Access by Proximity, Action B : Encourage higher density housing and commercial infill development that is consistent with General Plan and zoning standards in areas adjacent to existing public transportation services.

6. Policy T-43 – Bicycle Network, Action C: E
ncourage, and when appropriate, require
new multi -family residential developments to provide secure locker space for resident bicycles.

7. Policy T -16-Access by Proximity : Improve access by increasing proximity of residents to services, goods, and employment centers.

Staff Analysis: The proposed project is consistent with the above general plan policies as it is a higher density infill development that proposes 207 new dwelling
units that will count towards the City’s share of regional housing needs. The project is proximate to public transit, bicycle boulevards, and commercial corridors that offer various goods and services to residents.

A. University Avenue Specif ic Plan Consistency: The UASP Area Plan, adopted in 1996, also contains several policies applicable to the project, including the following:
• Goal 3: Revitalize the University Avenue Corridor through appropriate economic development and housing.
o Provide incentives for new mixed-use infill.
• Goal 4: Encourage more pedestrian- oriented development and an appropriate mix of uses to improve neighborhood identity.
o Encourage infill development

Staff Analysis: The proposed project is consistent with the above general plan policies as it is a higher density infill development that proposes 207 new dwelling units that will count towards the City’s share of regional housing needs.

ITEM #4
ZAB 05-11-2023

Page 256 of 263 ends
Page 422 ends

ZONING ADJUSTMENTS BOARD 1598 UNIVERSITY AVENUE
May 11, 2023 Page 19 of 19

File: \\cobnas11\g$\Departmental-Data\Planning\LANDUSE\Projects by Address\University\1598\ZP2022-0099\DOCUMENT FINALS\2023- 05-11_ZAB SR_1598 University.docx
Compared to both the eastern and western ends of the UASP plan area, the site is located within an underdeveloped section of the plan area. The project will redevelop the site, which currently maintains single-story commercial buildings and off-street, surface parking, with commercial and residential amenities on the ground floor and housing on the upper levels. The project is proximate to public transit, bicycle boulevards, and commercial corridors that offer various goods and services to residents.

VII. Recommendation

Because of the project’s consistency with the Zoning Ordinance and General Plan, and minimal impact on surrounding properties, staff recommends that the Zoning Adjustments Board:

A. APPROVE Use Permit pursuant to Section 23.406.040(D) and subject to the attached Findings and Conditions (see Attachment 1).

Attachments:

1. Findings and Conditions

2. Project Plans, received May 3, 2023

3. Notice of Public Hearing

4. Project Community Meeting Notes – March 30, 2022

5. Correspondence Received

Staff Planner: Katrina Lapira, [email protected], (510) 981-7488 ITEM #4
ZAB 05-11-2023

Page 257 of 263 ends
Page 423 ends

Planning and Development
Land Use Planning Division
1947 Center Street, 2 nd Floor Berkeley, CA 94704 Tel: 510.981.7410 TDD: 510.981.6903 Fax: 510.981.7420 E-mail: planning@ cityofberkeley.info
October 20, 2022
Isaiah Stackhouse
Trachtenberg Architects
2421 Fourth Street
Berkeley, CA 94710
Re: Application for Use Permit #ZP2022-0099 for 1598 University Isaiah Stackhouse,
The Land Use Division has reviewed the above referenced application, submitted on September 21, 2022 to demolish an existing non-residential structure and construct a 134,409 square-foot, eighth-story mixed-use residential building containing 207 dwelling units (21 Very Low-Income unit) and 5,787 square foot commercial space, with 39 parking spaces and 92 bicycle parking spaces. This the project is seeking a 50% Density Bonus by providing 15% of the base project units as affordable to very-low income households. Staff has determined that the application is incomplete and cannot take further action on the project until all the items listed below are corrected and/or submitted.

Application – The application includes the following approval requests:

1. Use Permit to demolish two non-residential buildings, under Berkeley Municipal Code (BMC) Section 23.326.070

2. Use Permit to establish a mixed-use residential building, under BMC Section

23.204.020.

3. Use Permit to create 5,000 square feet of new floor area in the University Commercial District, under BMC Section 23.204.030(B).

4. Use Permit to establish residential uses on the ground floor, under BMC

23.204.060(B)(3).

5. Use Permit to reduce the commercial ground floor area in a node overlay area to 20%.

Waivers
The application requests six waivers to modify the following development standards:

Development Standard Requirement Proposed
Average building height 48’ 89’ 2”
Building stories 4 8
FAR 3 4.47
Front setback 2’ average 0’
Side setback (California) 2’ average 3’ average*
Rear setback 20’ average 12’ 4” average*
Sent via email to:
[email protected]
Attachment 6

Page 258 of 263 ends
← All documents from this meeting