Ground-borne noise is not likely to be a problem because noise arriving via the normal airborne path will usually be greater than ground-borne noise. Ground-borne vibraƟon has the potenƟal to disturb people and damage buildings. Ground-borne vibraƟon is usually measured in terms of vibraƟon velocity, either the root-mean-square (RMS) velocity or peak parƟcle velocity (PPV). The RMS velocity is best for characterizing human response to building vibraƟon, and PPV is used to characterize potenƟal for damage. Decibel notaƟon acts to compress the range of numbers required to describe vibraƟon.

NOISE AND VIBRATION REGULATIONS
Local Noise RegulaƟons
City of Beverly Hills
General Plan Noise Element. The City’s General Plan Noise Element (2010) contains noise-related goals and policies that address unnecessary, excessive, and annoying noise levels and sources from construcƟon. Applicable construcƟon noise-related goals and policies are described below.

Goal N 1 Land Use Conflicts. Minimize land use conflicts between various noise sources and other human acƟviƟes.

Policy N 1.6 ConstrucƟon. In Beverly Hills, it is against the law to operate equipment or perform any outside construcƟon or repair work on any building, structure, pneumaƟc hammer, derrick, steam or electric hoist, or other construcƟon type devices, between the hours of 6:00 p.m. of one day and 8:00 a.m. of the next day, or at any Ɵme on any public holiday so as to cause discomfort or annoyance in a residenƟal zone, unless beforehand a permit therefore has been obtained.

LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 7 Goal N 4 ConstrucƟon Noise. Minimize excessive construcƟon-related noise.

Policy N 4.1 Enforce Hours of ConstrucƟon AcƟvity. ConƟnue to enforce restricƟons on hours of construcƟon acƟvity to minimize the impact of noise and vibraƟon from trucks, heavy drilling equipment, and other heavy machinery on adjacent noisesensiƟve receptors, parƟcularly in and near residenƟal areas.

Municipal Code. The following regulaƟons in SecƟons 5-1-205 and 5-1-206 in the City’s Municipal Code are applicable to the project:
5-1-205: RestricƟons on ConstrucƟon AcƟvity
A. No person shall engage in construcƟon, maintenance or repair work which requires a city permit between the hours of 6:00 p.m. and 8:00 a.m. of any day, or at any Ɵme on a Sunday or a holiday set forth below unless such person has been issued an aŌer-hours construcƟon permit issued pursuant to subsecƟon C of this secƟon. In addiƟon, no person shall engage in such work within a residenƟal zone, or within 500 feet of a residenƟal zone, at any Ɵme on a Saturday unless such person has been issued an aŌer-hours construcƟon permit issued pursuant to subsecƟon C of this secƟon. For the purpose of this secƟon, "holiday" shall mean:

1. New Year's Day

2. MarƟn Luther King Jr. Day

3. Presidents' Day

4. Memorial Day

5. Juneteenth

6. Independence Day

7. Labor Day

8. Yom Kippur

9. Veterans Day

10. Thanksgiving Day

11. The day aŌer Thanksgiving Day

12. Christmas Day
Nothing in this secƟon shall restrict the performance of "emergency work" as that term is defined in SecƟon 5-1-102 of this chapter.

B. No person employed for the purposes of construcƟon, maintenance, or repair work which requires a city permit shall enter a site on which such work will be done prior to 8:00 a.m. Any violaƟon of this subsecƟon shall be deemed to be an infracƟon.

C. The city building official, aŌer consultaƟon with appropriate City officials, may issue an aŌer-hours construcƟon permit authorizing work and/or entrance to a work site otherwise prohibited by this secƟon if the City building official determines that the public interest will be served by the issuance of such an aŌer-hours construcƟon permit includes, but are not limited to, construcƟon near school grounds, and construcƟon that may interfere with vehicular or pedestrian traffic in heavily traveled public rights-of-way.

D. ApplicaƟons for an aŌer-hours construcƟon permit issued pursuant to subsecƟon C of this secƟon shall be in wriƟng and shall set forth how the public interest will be served by issuing the permit. An aŌer-hours construcƟon permit LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 8 may be revoked or suspended by the City building official if the City building official determines that acƟvity conducted pursuant to the permit detrimentally affects the public health, safety or welfare.
5-1-206: Noise in Proximity of Schools, Hospitals, and Churches It shall be unlawful for any person to create any noise on any street, sidewalk, or public place adjacent to any school, insƟtuƟon of learning, or religious insƟtuƟon while the same is in use, or adjacent to any hospital; which noise substanƟally and unreasonably interferes with the workings of such insƟtuƟons or which disturbs or unduly annoys paƟents in the hospital, provided that conspicuous signs are displayed on such street, sidewalk, or public place indicaƟng the presence of a school, religious insƟtuƟon, or hospital.

Local VibraƟon RegulaƟons
City of Beverly Hills
The City does not establish specific vibraƟon criteria within the General Plan or Municipal Code.

Consistent with the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021), the project would result in excessive ground-borne vibraƟon if vibraƟon levels exceed the thresholds shown in Table C. In addiƟon, consistent with the approach of the original environmental documentaƟon and the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021), the FTA vibraƟon annoyance criterion of 72 VdB was used to assess nighƫme human annoyance impacts at places where people sleep, including hotel rooms and residences from nighƫme construcƟon acƟviƟes.

Table C: VibraƟon Thresholds
Type of Impact
Thresholds for Occasional Pass-bys
of ConstrucƟon Equipment
(in/sec PPV)1
Thresholds for Extended ConstrucƟon
AcƟviƟes and OperaƟonal AcƟviƟes
(in/sec PPV)1
Human Annoyance1 0.240 0.040
Damage to Historic and Some Old
Buildings 0.500 0.250
Damage to Older ResidenƟal Structures 0.500 0.300
Damage to Newer ResidenƟal
Structures 1.000 0.500
Source: One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report (Rincon Consultants, Inc. 2021) Note: Transient vibraƟon levels are esƟmated for construcƟon acƟviƟes that would result in infrequent, occasional pass-bys of construcƟon equipment (less than 70 events per day) while steady-state vibraƟon levels are esƟmated for construcƟon acƟviƟes that would occur for longer periods of Ɵme at a single locaƟon on the project site (Caltrans 2020a). 1 Thresholds are based on the points at which transient vibraƟons are disƟnctly percepƟble from other vibraƟons. in/sec = inches per second
PPV = peak parƟcle velocity
LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 9

THRESHOLD OF SIGNIFICANCE
ConstrucƟon Noise
Consistent with the City’s construcƟon noise regulaƟons above and the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021), the project would result in a significant noise impact if project construcƟon acƟviƟes generate a noise increase of 5 dBA outside the permiƩed construcƟon hours specified in SecƟon 5-1-205 of the City’s Municipal Code or would increase noise by 5 dBA or more during dayƟme hours at a school, hospital, church, or insƟtute of learning.

ConstrucƟon VibraƟon
Consistent with the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021), the project would result in excessive ground-borne vibraƟon if vibraƟon levels exceed the thresholds shown in Table C. In addiƟon, consistent with the approach of the original environmental documentaƟon and the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021), the FTA vibraƟon annoyance criterion of 72 VdB was used to assess nighƫme human annoyance impacts at places where people sleep, including hotel rooms and residences from nighƫme construcƟon acƟviƟes.

EXISTING SETTING
Overview of the ExisƟng Noise Environment
The primary exisƟng noise sources in the project area are transportaƟon faciliƟes. Traffic on Wilshire Boulevard, North Santa Monica Boulevard, and South Santa Monica Boulevard is a consistent source of ambient noise in the project area.

ExisƟng Land Uses in the Project Vicinity
The route for the extension of the underground electrical infrastructure along the exisƟng public roadway rights-of-way on South Santa Monica Boulevard and Charleville Boulevard is surrounded by commercial uses, a hotel (The Peninsula), and residenƟal uses. The closest residences are located on the southwest corner of the intersecƟon of South Santa Monica Boulevard and Charleville Boulevard and single-family residences on the west side of North Santa Monica Boulevard and north of Wilshire Boulevard. The hotel (The Peninsula) is located on the south side of South Santa Monica Boulevard, between Charleville Boulevard and Wilshire Boulevard. The underground electrical infrastructure work will not be performed in proximity to any schools, hospitals, churches or insƟtutes of learning.1 Ambient Noise Measurements
Long-Term Noise Level Measurements
The long-term (24-hour) noise level measurement at LT-2 from the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021) is provided below. The noise measurement was conducted from September 3 to September 4, 2020, using an Extech Model 407780A, ANSI Type 2 integraƟng sound level meter to document the exisƟng noise environment 1 Construction noise impacts would be less than significant at the JEM Community Center, which is located over 300 feet to the west of the intersection of Charleville Boulevard and South Santa Monica Boulevard.

LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 10 within the project area. Table D shows the results of the long-term noise level measurement. As shown in Table D, the lowest hourly noise level between 6:00 p.m. and 9:00 p.m. is 70.0 dBA Leq, and the lowest hourly noise level between 9:00 p.m. and 6:00 a.m. is 61.0 dBA Leq. Based on the measured noise level at ST-5, the corresponding noise level at the nearest residenƟal property are esƟmated to be 9.0 dBA lower, resulƟng in hourly noise levels of 61.0 dBA Leq during the 6:00 p.m. to 9:00 p.m. period and 52.0 dBA Leq during the 9:00 p.m. to 6:00 a.m. period. Figure 3 shows the noise monitoring locaƟon at LT-2.

Table D: Long-Term (24-Hour) Noise Level Measurement Results at LT-2 Start Time Date Noise Level (dBA Leq)
1:00 PM 9/3/2020 74
2:00 PM 9/3/2020 75
3:00 PM 9/3/2020 73
4:00 PM 9/3/2020 74
5:00 PM 9/3/2020 75
6:00 PM 9/3/2020 75
7:00 PM 9/3/2020 74
8:00 PM 9/3/2020 70
9:00 PM 9/3/2020 72
10:00 PM 9/3/2020 71
11:00 PM 9/3/2020 73
12:00 AM 9/4/2020 70
1:00 AM 9/4/2020 68
2:00 AM 9/4/2020 66
3:00 AM 9/4/2020 61
4:00 AM 9/4/2020 74
5:00 AM 9/4/2020 74
6:00 AM 9/4/2020 71
7:00 AM 9/4/2020 75
8:00 AM 9/4/2020 72
9:00 AM 9/4/2020 73
10:00 AM 9/4/2020 73
11:00 AM 9/4/2020 72
12:00 PM 9/4/2020 73
Source: One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report (Rincon Consultants, Inc. 2021).
dBA = A-weighted decibel Leq = equivalent conƟnuous sound level Short-Term Noise Level Measurements
A short-term (15-minute) noise level measurement conducted at ST-5 for the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021) recorded a noise level of 64 dBA Leq, as shown in Table E. This noise level is 9 dBA lower than the measured noise level at LT-2 during the corresponding hour. Applying this adjustment to the long-term monitoring results at LT-2, the esƟmated lowest hourly ambient noise levels at ST-5 were 61 dBA Leq during the evening period (6:00 p.m. to 9:00 p.m.) and 52 dBA Leq during the nighƫme period (9:00 p.m. to 6:00 a.m.). These noise levels are representaƟve of the residences located west of North Santa Monica Boulevard north of Wilshire Boulevard. Figure 3 shows the noise monitoring locaƟon at ST-5.

LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 11 Table E: Short-Term Noise Level Measurement Results
Monitor
No. LocaƟon DescripƟon Date Start Time DuraƟon (minutes) Noise Level
(dBA Leq)
ST-5
Beverly Gardens Park (north of intersecƟon of North
Santa Monica Boulevard and Walden Drive). 95 feet to
the centerline of North Santa Monica Boulevard
9/3/20 12:44 p.m. 15 64
Source: One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report (Rincon Consultants, Inc. 2021). dBA = A-weighted decibel
Leq = equivalent conƟnuous sound level
ExisƟng Traffic Noise Level
The Federal Highway AdministraƟon (FHWA) Highway Traffic Noise PredicƟon Model (1977; FHWA RD-77-108) was used to evaluate highway traffic-related noise condiƟons along roadway segments in the project vicinity. This model requires various parameters, including traffic volumes, vehicle mix, vehicle speed, and roadway geometry to compute typical equivalent noise levels during dayƟme, evening, and nighƫme hours. The resultant noise levels are weighted and summed over 24-hour periods to determine the CNEL values. ExisƟng average daily traffic (ADT) volumes and the vehicle mix for roadways in the project area were obtained from traffic counts (Beverly Hills 2019). Table F provides the exisƟng traffic noise levels in the project vicinity. These noise levels represent the worstcase scenario, which assumes that no shielding is provided between the traffic and the locaƟon where the noise contours are drawn. AƩachment C provides the specific assumpƟons used in developing these noise levels and model printouts.

The hotel and the residences at the intersecƟon of South Santa Monica Boulevard and Charleville Boulevard would have an esƟmated exisƟng ambient noise level of 67.8 dBA CNEL at a distance of approximately 32 feet from the centerline of South Santa Monica Boulevard, based on the traffic noise levels shown in Table F. Based on the daily noise level, the lowest hourly ambient noise level was esƟmated to be 61 dBA Leq during the evening period (6:00 p.m. to 9:00 p.m.). The lowest hourly ambient noise level during the nighƫme period (9:00 p.m. to 6:00 a.m.) was esƟmated to be 52 dBA Leq, based on the observed difference between evening and nighƫme noise levels at ST-5.

Table F: ExisƟng Traffic Noise Levels
Roadway Segment ADT
Centerline
to 70 dBA
CNEL (Ō)
Centerline
to 65 dBA
CNEL (Ō)
Centerline
to 60 dBA
CNEL (Ō)
CNEL (dBA)
50 Ō from
Centerline of
Outermost Lane
South Santa Monica Boulevard 21,270 <50 <50 104 62.9
Source: Compiled by LSA (2026).

Note: Traffic noise within 50 Ō of the roadway centerline should be evaluated with site-specific informaƟon.

ADT = average daily traffic
CNEL = Community Noise Equivalent Level
dBA = A-weighted decibels
Ō = foot/feet
LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 12

IMPACTS
ConstrucƟon Noise Impacts
Two types of short-term noise impacts could occur during construcƟon on the project site. First, construcƟon crew commutes and the transport of construcƟon equipment and materials to the site for the proposed project would incrementally increase noise levels on roads leading to the site. The pieces of heavy equipment for construcƟon acƟviƟes will be of limited quanƟƟes and will not meaningfully add to the daily traffic volume in the project vicinity. Although there would be a relaƟvely high single-event noise exposure potenƟal causing intermiƩent noise nuisance (passing trucks at 50 feet would generate up to a maximum of 84 dBA), the effect on daily ambient noise levels would be small because the daily construcƟon-related vehicle trips are small compared to the exisƟng daily traffic volume on South Santa Monica Boulevard, North Santa Monica Boulevard, and Wilshire Boulevard, which would be used to access the project site. The results of the California Emissions EsƟmator Model (CalEEMod) (Version 2022.1) contained in AƩachment B of the Underground Electrical Infrastructure Extension ConstrucƟon Air Quality and Greenhouse Gas Impact Analysis for the One Beverly Hills Project (LSA 2026) indicate that the drainage, uƟliƟes, and subgrade phase would generate the most trips compared to the trenching phase. Those trips are calculated to have an acousƟcal equivalent traffic volume of 6,882 passenger car equivalent vehicles on South Santa Monica Boulevard, North Santa Monica Boulevard, and Wilshire Boulevard. South Santa Monica Boulevard, North Santa Monica Boulevard, and Wilshire Boulevard have exisƟng average daily traffic volumes of 21,270, 41,857, and 22,574, respecƟvely, near the project site based on the City’s Average Daily Traffic (City of Beverly Hills 2021). Based on the informaƟon above and the calculaƟons provided in AƩachment D, construcƟon-related traffic would increase noise levels by up to 1.2 dBA. A noise level increase of less than 3 dBA would not be percepƟble to the human ear in an outdoor environment. In addiƟon, this noise increase would not exceed the 5 dBA noise increase threshold. Therefore, short-term construcƟon-related noise impacts associated with worker commute and transport of equipment and materials to and from the project site would be less than significant. No addiƟonal miƟgaƟon measures are required.

The second type of short-term noise impact is related to noise generated from construcƟon acƟviƟes. ConstrucƟon is performed in discrete steps, each of which has its own mix of equipment and, consequently, its own noise characterisƟcs. The project anƟcipates uƟlity potholing, saw cuƫng, asphalt milling and removal, trench excavaƟon, installaƟon of underground electrical conduits, construcƟon and placement of precast electrical vaults, installaƟon of vent line conduits, slurry backfilling, aggregate base placement, asphalt pavement restoraƟon, and final pavement striping. These various sequenƟal phases change the character of the noise generated on a project site. Therefore, the noise levels vary as construcƟon progresses. Despite the variety in the type and size of construcƟon equipment, similariƟes in the dominant noise sources and paƩerns of operaƟon allow construcƟon-related noise ranges to be categorized by work phase. Table G lists the anƟcipated construcƟon equipment provided by Bali ConstrucƟon, Inc. along with the Leq noise level at 50 feet, which was calculated based on the reference instantaneous maximum (Lmax) noise level at 50 feet obtained from the FHWA Highway ConstrucƟon Noise Handbook (FHWA 2006) or the equipment manufacturer specificaƟons and were adjusted using the acousƟcal use factor for each piece of equipment.

LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 13 Table G: ConstrucƟon Equipment Noise Levels
AnƟcipated
ConstrucƟon
Equipment1
Equivalent FHWA
ConstrucƟon
Equipment
AcousƟcal
Use
Factor2
Actual
Measured
Maximum
Noise Level3
(Lmax) at 50 Ō
Noise Level
(dBA Leq)
Ford F550 UƟlity Truck Pickup Truck 40 55.0 51.0
Komatsu PC360-LC Hydraulic Excavator4 40 70.3 66.3
Caterpillar 924H Wheel Loader4 40 66.3 62.3
Wirtgen W 210 FI4 40 77.3 73.3
TRUVAC HXX Hydro ExcavaƟon Vacuum Excavator 40 85.0 81.0 Super 10 Dump Truck Dump Truck 40 84.0 80.0
Sawcut Concrete Saw 20 90.0 83.0
Link-Belt 120 RT Hydraulic Crane Crane 16 85.0 77.0
Mack Granite 64BR Ready-Mix Concrete Mixer Truck Concrete Mixer Truck 40 85.0 81.0 Caterpillar AP655F Asphalt Paver Paver 50 85.0 82.0
BOMAG BW 900-50 Tandem Roller Roller 20 85.0 78.0
Elgin Pelican Street Sweeper Vacuum Street Sweeper 10 80.0 70.0 Caterpillar 272D3 Skid Steer4 40 67.3 63.3
Kenworth T800 Water Truck Pickup Truck 40 55.0 51.0
80k Excavator Excavator 40 85.0 81.0
Graco Line Lazer V 5900 Pickup Truck 40 60.9 56.9
Source: Compiled by LSA (2026).
1 AnƟcipated construcƟon equipment provided by Bali ConstrucƟon, Inc. 2 Usage factor is the percentage of Ɵme during a construcƟon noise operaƟon that a piece of construcƟon equipment is operaƟng at full power. 3
Maximum noise levels from the FHWA Highway ConstrucƟon Noise Handbook, Table 9.1 (FHWA 2006) and were developed based on Spec 721.560 from the CA/T program to be consistent with the City of Boston, MassachuseƩs, Noise Code for the “Big Dig” project. 4
Noise level based on the equipment specificaƟons.

CA/T = Central Artery/Tunnel
FHWA = Federal Highway AdministraƟon
Ō = foot/feet
Lmax = maximum instantaneous noise level
Based on the detailed construcƟon plan provided by Bali ConstrucƟon, Inc., included as AƩachment E, the extension of the underground electrical infrastructure associated with the project would take approximately 39 days to complete consisƟng of eight construcƟon areas. During the first 19 days, construcƟon would occur between the hours of 9:00 a.m. and 9:00 p.m. in ConstrucƟon Areas 1, 2, 3, and 5, as depicted in AƩachment E. In ConstrucƟon Area 4, work would occur between the hours of 9:00 a.m. and 6:00 p.m. on Days 11 and 12. During the remaining 20 days (Day 20 through Day 39), construcƟon would occur between the hours of 9:00 p.m. and 6:00 a.m. predominately in ConstrucƟon Areas 6 through 8, with final striping occurring on Days 38 and 39. Saw cuƫng, asphalt milling, and hydro excavaƟon acƟviƟes within the first 17 days would be limited to between the hours of 9:00 a.m. and 6:00 p.m. and quieter construcƟon acƟviƟes, such as trenching, would occur between the hours of 6:00 p.m. and 9:00 p.m. In addiƟon, paving acƟviƟes on Days 18, 19, and 29 in ConstrucƟon Areas 1 through 5 for the remaining construcƟon areas near the residences and the Peninsula would occur between the hours of 9:00 a.m. and 6:00 p.m. The detailed construcƟon schedule, construcƟon hours, list of construcƟon equipment each day, and the descripƟon of acƟviƟes each day are provided in AƩachment E. AƩachment F provides the esƟmated daily construcƟon noise levels for work occurring both within and outside the City's permiƩed construcƟon hours based on the detailed construcƟon schedule, construcƟon hours, daily construcƟon equipment list, and acƟvity descripƟons provided in AƩachment E.

LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 14 Table H shows the construcƟon noise levels for each construcƟon area during the 39 days of construcƟon assuming the operaƟon of the loudest piece of equipment. ConstrucƟon noise levels were calculated based on the specific equipment expected to be operaƟng in each construcƟon area on a given day, as documented in the detailed construcƟon plans provided by Bali ConstrucƟon, Inc. (AƩachment E). Because construcƟon acƟviƟes differ between work periods within and outside of the City’s permiƩed construcƟon hours, two reference construcƟon noise levels are provided in Table H for ConstrucƟon Areas 1 through 5. The first value represents the loudest dayƟme construcƟon acƟviƟes occurring between 9:00 a.m. and 6:00 p.m., including saw cuƫng, asphalt milling, hydro excavaƟon, paving, and other equipment-intensive operaƟons. The second value represents the quieter trenching and uƟlity installaƟon acƟviƟes that would occur outside of the City’s permiƩed construcƟon hours, which involve smaller construcƟon equipment and lower overall noise levels. As shown in Table H, project construcƟon noise levels range between 59.8 to 97.0 dBA Leq for construcƟon acƟviƟes undertaken between 9:00 a.m. and 6:00 p.m. in ConstrucƟon Areas 1 through 5 along with paving acƟviƟes would comply with the permiƩed hours specified in SecƟon 5- 1-205 of the City’s Municipal Code. Noise generated from these project construcƟon acƟviƟes would be less than significant. However, project construcƟon noise levels range between 43.1 to 69.2 dBA Leq for construcƟon acƟviƟes undertaken between 6:00 p.m. and 9:00 p.m. and would increase ambient noise levels by up to 8.8 dBA before miƟgaƟon based on the lowest ambient noise level of

61.0 dBA Leq. In addiƟon, project construcƟon noise levels range between 44.3 to 69.7 dBA Leq for construcƟon acƟviƟes undertaken between 9:00 p.m. and 6:00 a.m. for ConstrucƟon Areas 6 through 8 and would increase ambient noise levels by up to 17.8 dBA before miƟgaƟon based on the lowest ambient noise level of 52.0 dBA Leq. These noise increases exceed the 5 dBA threshold above exisƟng ambient noise levels, and noise generated from project construcƟon acƟviƟes during this period without miƟgaƟon would be potenƟally significant.

ImplementaƟon of MM-Noise-1, which is idenƟfied in the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021), requiring all equipment, fixed or mobile, be operated with closed engine doors and be equipped with properly operaƟng and maintained mufflers consistent with manufacturers’ standards and portable sound enclosures for all generators and air compressors would reduce the noise increase to less than 5 dBA. Therefore, noise generated from project construcƟon acƟviƟes outside of the City’s permiƩed construcƟon hours would be less than significant with the implementaƟon of MM-Noise-1.

MM-NOISE-1 Prior to issuance of grading permits, the Developer shall submit a ConstrucƟon Management Plan saƟsfactory to the Director of Community Development and the Building Official. The Building Official shall enforce noise aƩenuaƟng construcƟon requirements. The ConstrucƟon Management Plan shall include, but not be limited to, the following noise aƩenuaƟon measures:
• ExcavaƟon, grading, and other construcƟon acƟviƟes related to the proposed project shall comply with SecƟon 5-1-206, RestricƟons on ConstrucƟon AcƟvity, of the Beverly Hills Municipal Code. Any deviaƟons from these standards shall require the wriƩen approval of the City Building Official.

LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 15 Table H: ConstrucƟon Noise Levels
Area ConstrucƟon Hours Land Use12
Reference
Noise Level1
at 50 Ō
(dBA Leq)
Distance2
(Ō)
Distance
AƩenuaƟon
(dBA)
Without MiƟgaƟon With MiƟgaƟon
Noise Level
(dBA Leq)
Ambient
Noise Level3
(dBA Leq)
Total
Noise Level
(dBA Leq)
Noise
Increase
(dBA)
Noise
Increase
Threshold4
(dBA)
Exceed
Noise
Increase
Threshold?
Noise Level
(dBA Leq)
Ambient
Noise Level3
(dBA Leq)
Total
Noise Level
(dBA Leq)
Noise
Increase
(dBA)
Noise
Increase
Threshold4
(dBA)
Exceed
Noise
Increase
Threshold?
1 9:00 a.m. to 9:00 p.m.

Residence5 83.0/66.3 190 11.6 71.4/54.7 617 61.9 0.9 5 No 34.7 617 61.0 0.0 5 No Hotel 83.0/66.3 36 -2.9 85.9/69.2 617 69.8 8.8 5 Yes 49.2 617 61.3 0.3 5 No Residence6 83.0/66.3 350 16.9 66.1/49.4 618 61.3 0.3 5 No 29.4 618 61.0 0.0 5 No 2 9:00 a.m. to 9:00 p.m.

Residence5 81.0/66.3 45 -0.9 81.9/67.2 617 68.1 7.1 5 Yes 47.2 617 61.2 0.2 5 No Hotel 81.0/66.3 40 -1.9 82.9/68.2 617 69.0 8.0 5 Yes 48.2 617 61.2 0.2 5 No Residence6 81.0/66.3 310 15.8 65.2/50.2 618 61.4 0.4 5 No 30.5 618 61.0 0.0 5 No 3 9:00 a.m. to 9:00 p.m.

Residence5 83.0/66.3 588 21.4 61.6/44.9 617 61.1 0.1 5 No 24.9 617 61.0 0.0 5 No Hotel 83.0/66.3 84 4.5 78.5/61.8 617 64.4 3.4 5 No 41.8 617 61.1 0.1 5 No Residence6 83.0/66.3 315 16.0 67.0/50.3 618 61.4 0.4 5 No 30.3 618 61.0 0.0 5 No 4 9:00 a.m. to 6:00 p.m.

Residence5 83.0 170 10.6 72.4 --9 -- -- -- -- -- --9 -- -- -- -- Hotel 83.0 10 -14.0 97.0 --9 -- -- -- -- -- --9 -- -- -- -- Residence6 83.0 615 21.8 61.2 --9 -- -- -- -- -- --9 -- -- -- -- 5 9:00 a.m. to 9:00 p.m.

Residence5 83.0/66.3 55 0.8 82.2/65.5 617 66.8 5.8 5 Yes 45.5 617 61.1 0.1 5 No Hotel 83.0/66.3 70 2.9 80.1/63.4 617 65.4 4.4 5 No 43.4 617 61.1 0.1 5 No Residence6 83.0/66.3 725 23.2 59.8/43.1 618 61.1 0.1 5 No 23.1 618 61.0 0.0 5 No 6 9:00 p.m. to 6:00 a.m.

Residence5 83.0 750 23.5 59.5 5210 60.2 8.2 5 Yes 39.5 5210 52.2 0.2 5 No Hotel 83.0 230 13.3 69.7 5210 69.8 17.8 5 Yes 49.7 5210 54.0 2.0 5 No Residence6 83.0 305 15.7 67.3 5211 67.4 15.4 5 Yes 47.3 5211 53.3 1.3 5 No 7 9:00 p.m. to 6:00 a.m.

Residence5 83.0 825 24.3 58.7 5210 59.5 7.5 5 Yes 38.7 5210 52.2 0.2 5 No Hotel 83.0 300 15.6 67.4 5210 67.5 15.5 5 Yes 47.4 5210 53.3 1.3 5 No Residence6 83.0 305 15.7 67.3 5211 67.4 15.4 5 Yes 47.3 5211 53.3 1.3 5 No 8 9:00 p.m. to 6:00 a.m.

Residence5 83.0 890 25.0 58.0 5210 59.0 7.0 5 Yes 38.0 5210 52.2 0.2 5 No Hotel 83.0 365 17.3 65.7 5210 65.9 13.9 5 Yes 45.7 5210 52.9 0.9 5 No Residence6 83.0 300 15.6 67.4 5211 67.5 15.5 5 Yes 47.4 5211 53.3 1.3 5 No Paving
9:00 a.m. to 6:00 p.m. Residence5 83.0 45 -0.9 83.9 --9 -- -- -- -- -- --9 -- -- -- -- 9:00 a.m. to 6:00 p.m. Hotel 83.0 10 -14.0 97.0 --9 -- -- -- -- -- --9 -- -- -- -- 9:00 p.m. to 6:00 a.m. Residence6 83.0 300 15.6 67.4 5211 67.5 15.5 5 Yes 47.4 5211 53.3 1.3 5 No Striping
9:00 p.m. to 6:00 a.m. Residence5 59.9 45 -0.9 60.8 5210 61.3 9.3 5 Yes 40.8 5210 52.3 0.3 5 No 9:00 p.m. to 6:00 a.m. Hotel 59.9 30 -4.4 64.3 5210 64.5 12.5 5 Yes 44.3 5210 52.7 0.7 5 No 9:00 p.m. to 6:00 a.m. Residence6 59.9 300 15.9 44.3 5211 52.7 0.7 5 No 24.3 5211 52.0 0.0 5 No Source: Compiled by LSA (2026). 1 Reference noise levels for construcƟon acƟviƟes occurring within/outside of the City’s permiƩed construcƟon hours. 2 Distance from the construcƟon equipment to the property line. 3 The ambient noise level for the hours occurring outside of the City’s permiƩed construcƟon hours. 4 The threshold applies to construcƟon acƟviƟes outside of the City’s permiƩed construcƟon hours. In addiƟon, the dayƟme threshold for schools, hospitals, churches, and insƟtutes of learning was not evaluated because the uƟlity work is not located in proximity to any such uses. 5 Rosewood Residence at the intersecƟon of South Santa Monica Boulevard and Charleville Boulevard. 6 Single-family residences west of North Santa Monica Boulevard and north of Wilshire Boulevard. 7 The esƟmated lowest ambient noise level between 6:00 p.m. and 9:00 p.m. were derived from the modeled traffic noise level, LT-2, and ST-5. 8 The esƟmated lowest ambient noise level between 6:00 p.m. and 9:00 p.m. were derived from LT-2 and ST-5. 9 ConstrucƟon acƟviƟes would not occur outside of the City’s permiƩed construcƟon hours. 10 The esƟmated lowest ambient noise level between 9:00 p.m. and 6:00 a.m. were derived from the modeled traffic noise level, LT-2, and ST-5. 11 The esƟmated lowest ambient noise level between 9:00 p.m. and 6:00 a.m. were derived from LT-2 and ST-5. 12 ConstrucƟon noise impacts would be less than significant at the JEM Community Center, which is located over 300 feet to the west of the intersecƟon of Charleville Boulevard and South Santa Monica Boulevard.dBA = A-weighted decibels Ō = foot/feet Leq = equivalent conƟnuous sound level
LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 16 • Stockpiling and vehicle staging areas shall be located as far away as pracƟcable from residences to the north and El Rodeo School. • All heavy-duty staƟonary construcƟon equipment (e.g., air compressors, generators, etc.) shall be placed so that emiƩed noise is directed away from the nearest sensiƟve receivers (i.e., residences to the north and El Rodeo School).
• Whenever pracƟcable, construcƟon acƟviƟes shall be scheduled so as to avoid operaƟng several pieces of equipment simultaneously, which causes high noise levels.
• Haul routes for removing excavated materials from the site shall be designed to avoid residenƟal areas and areas occupied by noisesensiƟve receivers (e.g., hospitals, schools, convalescent homes, etc.). • Prior to the start of every school year, the Developer shall obtain a schedule of tesƟng periods at El Rodeo School. The Developer shall submit a construcƟon schedule for review and approval by the Community Development Director and the Environmental Monitor that ensures that no construcƟon acƟvity generaƟng the highest noise levels (e.g., simultaneous demoliƟon, grading, and building construcƟon) is undertaken during any designated tesƟng periods at the school. Such tesƟng periods typically occur for one week per semester; however, the exact dates and Ɵmes will be determined by the Beverly Hills Unified School District.
• For construcƟon acƟviƟes occurring during the City’s allowed hours of construcƟon (weekdays, excluding public holidays, 8:00 a.m. to 6:00 p.m.), the following shall be required:
○ All equipment, fixed or mobile, shall be operated with closed engine doors and shall be equipped with properly operaƟng and
maintained residenƟal grade mufflers consistent with
manufacturers’ standards that provide at least a 5-dBA reducƟon in noise levels.
○ The Contractor shall use portable sound enclosures for all generators and air compressors that provide at least a 10-dBA reducƟon in noise levels.
• For construcƟon acƟviƟes occurring outside the City’s allowed hours of construcƟon, the following shall be required:
○ Simultaneous occurrence of two or more construcƟon phases (demoliƟon, site preparaƟon, grading, building construcƟon, paving, LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 17 and architectural coaƟng) shall be prohibited unless the project applicant reduces the number of construcƟon equipment used for each overlapping phase and it can be demonstrated through a quanƟtaƟve acousƟcal analysis prepared by a qualified professional that this reduced construcƟon equipment porƞolio uƟlized for overlapping phases will not result in noise levels in excess of 5 dBA above ambient noise levels. The acousƟcal analysis shall be reviewed and approved by the City prior to allowing simultaneous occurrence of two or more construcƟon phases outside the City’s allowed hours of construcƟon.
○ All equipment, fixed or mobile, shall be operated with closed engine doors and shall be equipped with properly operaƟng and
maintained mufflers consistent with manufacturers’ standards that provide at least a 20-dBA reducƟon in noise levels.
○ The Contractor shall use portable sound enclosures for all generators and air compressors that provide at least a 10-dBA reducƟon in noise levels.

ConstrucƟon VibraƟon Impacts
This construcƟon vibraƟon impact analysis assesses the potenƟal for building damage and human annoyance using vibraƟon levels in PPV (in/sec). Also, the analysis assesses nighƫme human annoyance using vibraƟon levels in RMS (VdB).

Project construcƟon is expected to require the use of loaded trucks and a vibratory roller. Loaded trucks would generate ground-borne vibraƟon levels of up to 0.076 in/sec PPV (86 VdB) when measured at 25 feet based on the Transit Noise and VibraƟon Impact Assessment Manual (FTA 2018). The proposed vibratory roller, a BOMAG BW 900-50, is expected to generate a vibraƟon level of approximately 0.080 in/sec PPV (86 VdB) at 25 feet. This esƟmate is based on the reference vibraƟon level for vibratory rollers provided in the Transit Noise and VibraƟon Impact Assessment Manual (FTA 2018). The BOMAG BW 900-50 has a lower operaƟng weight and centrifugal force than larger vibratory rollers. Therefore, the FTA reference vibraƟon level is considered a conservaƟve esƟmate of the vibraƟon that could be generated by the proposed roller.

The distance to the nearest buildings for vibraƟon impact analysis is measured between the nearest off-site buildings and the project boundary (assuming the construcƟon equipment would be used at or near the project boundary) because vibraƟon impacts normally occur within the buildings. The formula for vibraƟon transmission is provided below:

LvdB (D) = LvdB (25 Ō) - 30 Log (D/25)
PPVequip = PPVref x (25/D)1.1

LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 18 Table I lists the projected vibraƟon levels from various construcƟon equipment expected to be used on the project site in the acƟve construcƟon area to the nearest buildings in the project vicinity. As shown in Table I, vibraƟon levels would not exceed the damage thresholds of 0.5 in/sec PPV for transient sources at the closest buildings (residences, hotel, and commercial). Also, vibraƟon levels would not exceed the vibraƟon annoyance threshold of 0.240 in/sec PPV for transient sources at the closest buildings (residences, hotel, and commercial).

In addiƟon, vibraƟon levels would not exceed the nighƫme vibraƟon annoyance threshold of 72 VdB at the residences located west of North Santa Monica Boulevard and north of Wilshire Boulevard.

For the residences and the hotel located at the intersecƟon of South Santa Monica Boulevard and Charleville Boulevard, the nighƫme vibraƟon annoyance threshold of 72 VdB does not apply because project construcƟon acƟviƟes would not occur outside of the City’s permiƩed construcƟon hours. Therefore, construcƟon vibraƟon impacts during project construcƟon would be less than significant. No miƟgaƟon measures are required.

CONCLUSION
ConstrucƟon Noise
ConstrucƟon-related traffic noise from worker commute and transport of equipment and materials would increase noise levels by up to 0.7 dBA. A noise level increase of less than 3 dBA would not be percepƟble to the human ear in an outdoor environment. In addiƟon, this noise increase would not exceed the 5 dBA noise increase threshold. Therefore, short-term construcƟon-related noise impacts associated with worker commute and transport of equipment and materials to and from the project site would be less than significant. No addiƟonal miƟgaƟon measures are required.

Similar to the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021), project construcƟon noise levels range between 59.8 to 97.0 dBA Leq for construcƟon acƟviƟes undertaken between 9:00 a.m. and 6:00 p.m. in ConstrucƟon Areas 1 through 5 along with paving acƟviƟes would comply with the permiƩed hours specified in SecƟon 5-1-205 of the City’s Municipal Code. Noise generated from project construcƟon acƟviƟes would be less than significant.

However, project construcƟon noise levels range between 43.1 to 69.2 dBA Leq for construcƟon acƟviƟes undertaken between 6:00 p.m. and 9:00 p.m. and would increase ambient noise levels by up to 8.8 dBA before miƟgaƟon based on the lowest ambient noise level of 61.0 dBA Leq. In addiƟon, project construcƟon noise levels range between 44.3 to 69.7 dBA Leq for construcƟon acƟviƟes undertaken between 9:00 p.m. and 6:00 a.m. for ConstrucƟon Areas 6 through 8 and would increase ambient noise levels by up to 17.8 dBA before miƟgaƟon based on the lowest ambient noise level of

52.0 dBA Leq. These noise increases exceed the 5 dBA threshold above exisƟng ambient noise levels, and noise generated from project construcƟon acƟviƟes during this period would be potenƟally significant. ImplementaƟon of MM-Noise-1, which is idenƟfied in the One Beverly Hills Overlay Specific Plan Final Supplemental EIR (Rincon Consultants, Inc. 2021), requiring all equipment, fixed or mobile, be operated with closed engine doors and be equipped with properly operaƟng and maintained mufflers consistent with manufacturers’ standards and portable sound enclosures for all generators and air compressors would provide the necessary noise reducƟon so that project construcƟon acƟviƟes would not increase ambient noise levels by 5 dBA or more. Therefore, noise LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 19 Table I: ConstrucƟon VibraƟon Analysis
Land Use Equipment/ AcƟvity
Reference
VibraƟon
Level
(PPV/VdB)
at 25 Ō
Distance
to
Structure
(Ō)1
VibraƟon
Level
(PPV/VdB)
VibraƟon
Damage
Threshold
(Transient)5
Exceed?
VibraƟon
Annoyance
Threshold
(Transient)
Exceed?
Nighƫme
VibraƟon
Annoyance
Threshold
Exceed?
Commercial Vibratory Roller 0.080/86 18 0.115/90 0.5 No 0.240 No --2 --2 Loaded trucks 0.076/86 18 0.109/90 0.5 No 0.240 No --2 --2Residence (Rosewood) Vibratory Roller 0.080/86 40 0.048/80 0.5 No 0.240 No N/A3 N/A3 Loaded trucks 0.076/86 40 0.045/80 0.5 No 0.240 No N/A3 N/A3 Hotel (The Peninsula)
Vibratory Roller 0.080/86 10 0.219/98 0.5 No 0.240 No N/A3 N/A3 Loaded trucks 0.076/86 10 0.208/98 0.5 No 0.240 No N/A3 N/A3 Residence4 Vibratory Roller 0.080/86 300 0.005/54 0.5 No 0.240 No 72 No Loaded trucks 0.076/86 300 0.005/54 0.5 No 0.240 No 72 No Source: Compiled by LSA (2026). 1 Distance from the construcƟon acƟvity to the building structure. 2 There are no nighƫme vibraƟon annoyance thresholds for commercial uses. 3 Not Applicable. Project construcƟon acƟviƟes involving the vibratory roller or loaded trucks would not occur during nighƫme hours outside of the City’s permiƩed hours of construcƟon near the residence and hotel at the intersecƟon of South Santa Monica Boulevard and Charleville Boulevard. 4 Residences located west of North Santa Monica Boulevard and north of Wilshire Boulevard. 5 Transient vibraƟon levels are esƟmated for construcƟon acƟviƟes that would result in infrequent, occasional pass-bys of construcƟon equipment (less than 70 events per day) while steady-state vibraƟon levels are esƟmated for construcƟon acƟviƟes that would occur for longer periods of Ɵme at a single locaƟon on the project site (Caltrans 2020).

Ō = foot/feet VdB = vibraƟon velocity decibels
LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 20 generated from project construcƟon acƟviƟes outside of the City’s permiƩed construcƟon hours would be less than significant with the implementaƟon of MM-Noise-1.

ConstrucƟon VibraƟon
VibraƟon levels generated from project construcƟon acƟviƟes would not exceed the damage thresholds of 0.5 in/sec PPV and 0.3 in/sec PPV for transient and steady-state sources, respecƟvely, at the closest buildings (residences, hotel, and commercial). Also, vibraƟon levels would not exceed the vibraƟon annoyance threshold of 0.240 in/sec PPV for transient sources at the closest buildings (residences, hotel, and commercial).

In addiƟon, vibraƟon levels would not exceed the nighƫme vibraƟon annoyance threshold of 72 VdB at the residences located west of North Santa Monica Boulevard and north of Wilshire Boulevard.

For the residences and the hotel located at the intersecƟon of South Santa Monica Boulevard and Charleville Boulevard, the nighƫme vibraƟon annoyance threshold of 72 VdB does not apply because project construcƟon acƟviƟes would not occur outside of the City’s permiƩed construcƟon hours. Therefore, construcƟon vibraƟon impacts during project construcƟon would be less than significant. No miƟgaƟon measures are required.

AƩachments: A: References
B: Figures
C: FHWA Traffic Noise Model Printouts
D: ConstrucƟon Traffic Noise CalculaƟons
E: Detailed ConstrucƟon Plans
F: Daily ConstrucƟon Noise Levels
LSA
A-1

CONSTRUCTION NOISE AND VIBRATION I MPACT A NALYSIS
A UGUST 2026

ONE BEVERLY HILLS P ROJECT

BEVERLY HILLS , C ALIFORNIA
P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx (08/06/26)

ATTACHMENT A

REFERENCES
City of Beverly Hills. 2010. General Plan Noise Element. April 30. Website: hƩps://www.beverlyhills. org/DocumentCenter/View/5513/08-Noise-PDF (accessed August 2026). ______. 2021. Average Daily Traffic (ADT). October. Website: Website: hƩps://www.beverlyhills. org/DocumentCenter/View/13101/Average-Daily-Traffic-PDF (accessed August 2026). ______. 2026. Municipal Code. February 4.

Federal Highway AdministraƟon (FHWA). 2006. FHWA Highway ConstrucƟon Noise Handbook.

Roadway ConstrucƟon Noise Model, FHWA-HEP-06-015. DOT-VNTSC-FHWA-06-02. NTIS No. PB2006-109012. August.

Federal Transit AdministraƟon (FTA). 2018. Transit Noise and VibraƟon Impact Assessment Manual.

FTA Report No. 0123. September. Website: hƩps://www.transit.dot.gov/sites/Ōa.dot.gov/ files/docs/research-innovaƟon/118131/transit-noise-and-vibraƟon-impact-assessmentmanual-Ōa-report-no-0123_0.pdf (accessed August 2026).

Harris, Cyril M., ed. 1991. Handbook of AcousƟcal Measurements and Noise Control. 3rd EdiƟon.

McGraw-Hill, Inc.

LSA Associates, Inc (LSA). 2026. Southern California Edison Underground Electrical Infrastructure ConstrucƟon Air Quality and Greenhouse Gas Impact Analysis for the One Beverly Hills Project. August.

Rincon Consultants, Inc. 2021. One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report. March.

LSA

CONSTRUCTION NOISE AND VIBRATION I MPACT A NALYSIS
A UGUST 2026

ONE BEVERLY HILLS P ROJECT

BEVERLY HILLS , C ALIFORNIA
P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx (08/06/26)

ATTACHMENT B

FIGURES
Figure 1: Project LocaƟon
Figure 2: Project ConstrucƟon Boundary
Figure 3: Noise Monitoring LocaƟons
LSA
L
SA
t
875 1750
FEET
SOURCE: Esri
(2025) l=I
Project Site
1:1 Southern California Edison (SCE) Electrical Infrastructure FIGURE 1
One Beverly Hills Project
Project
Location l:\2026\20263059\GIS\Pro\Cain Dev - One Beverly Hills\One Beverly Hills Project.aprx (Fig 1-Project location) 8/3/2026 10:35 AM 75 150
t=] Ra
Construction Boundary
FIGURE 2
One Beverly Hills Project
Project Construction Boundary
FEET
SOURCE: Nearmap (4/9/2026)
l:\2026\20263059\GIS\Pro\Cain Dev - One Beverly Hills\One Beverly Hills Project.aprx (Fig 2-Project Construction Boundary) 8/3/2026 10:36 AM
LSA
175 350
l=I Project Site
[1 construction Boundary
Noise Monitoring Locations
• Long-Term Noise Measurement Location
0 Short-Term Noise Measurement Location
FIGURE 3
One Beverly Hills Project
Noise Monitoring Locations
FEET
SOURCE: Nearmap (4/9/2026)
l:\2026\20263059\GIS\Pro\Cain Dev - One Beverly Hills\One Beverly Hills Project.aprx (Fig 3-Noise Monitoring Locations) 8/3/2026 10:49 AM

CONSTRUCTION NOISE AND VIBRATION I MPACT A NALYSIS
A UGUST 2026

ONE BEVERLY HILLS P ROJECT

BEVERLY HILLS , C ALIFORNIA
P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx (08/06/26)

ATTACHMENT C

FHWA TRAFFIC NOISE MODEL PRINTOUTS
LSA
TABLE Existing -01

FHWA ROADWAY NOISE LEVEL ANALYSIS
RUN DATE: 07/29/2026
ROADWAY SEGMENT: South Santa Monica Boulevard
NOTES: One Beverly Hills - Existing
______________________________________________________________________ * * ASSUMPTIONS * *
AVERAGE DAILY TRAFFIC: 21270 SPEED (MPH): 25 GRADE: .5

TRAFFIC DISTRIBUTION PERCENTAGES

DAY EVENING NIGHT
--- ------- -----
AUTOS

75.51 12.57 9.34

M-TRUCKS

1.56 0.09 0.19

H-TRUCKS

0.64 0.02 0.08
ACTIVE HALF-WIDTH (FT): 18 SITE CHARACTERISTICS: SOFT
______________________________________________________________________ * * CALCULATED NOISE LEVELS * *
CNEL AT 50 FT FROM NEAR TRAVEL LANE CENTERLINE (dB) = 62.93

DISTANCE (FEET) FROM ROADWAY CENTERLINE TO CNEL
70 CNEL 65 CNEL 60 CNEL 55 CNEL
------- ------- ------- -------

0.0 0.0 104.3 222.1
______________________________________________________________________

CONSTRUCTION NOISE AND VIBRATION I MPACT A NALYSIS
A UGUST 2026

ONE BEVERLY HILLS P ROJECT

BEVERLY HILLS , C ALIFORNIA
P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx (08/06/26)

ATTACHMENT D

CONSTRUCTION TRAFFIC NOISE CALCULATIONS
LSA
Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
1 Linear, Drainage, Utilities, & Sub-Grade 8/11/2026 8/12/2026 5 50.00 4.00 169.00 2 223 50 105 6,727 6,882 30 8.9 26.3 Trenching 8/10/2026 8/11/2026 8 54.00 4.00 0.00 2 58 54 105 0 159 35 7.1 19.1 0 000 0 40 5.8 15.10 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 58 6,882 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 6,882 1.2North Santa Monica Boulevard 35 41,857 7.1 19.1 6,882 0.7Wilshire Boulevard 30 22,574 8.9 26.3 6,882 1.2 Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
2 Linear, Drainage, Utilities, & Sub-Grade 8/13/2026 8/17/2026 5 40.00 4.00 158.00 3 202 40 105 6,289 6,434 30 8.9 26.3 Trenching 8/13/2026 8/13/2026 5 48.00 4.00 0.00 1 52 48 105 0 153 35 7.1 19.1 0 000 0 40 5.8 15.10 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 52 6,434 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 6,434 1.1North Santa Monica Boulevard 35 41,857 7.1 19.1 6,434 0.6Wilshire Boulevard 30 22,574 8.9 26.3 6,434 1.1 Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
3 Linear, Drainage, Utilities, & Sub-Grade 8/19/2026 8/19/2026 4 40.00 4.00 25.00 1 69 40 105 995 1,140 30 8.9 26.3 Trenching 8/18/2026 8/18/2026 5 42.00 4.00 0.00 1 46 42 105 0 147 35 7.1 19.1 0 000 0 40 5.8 15.10 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 46 1,140 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 1,140 0.2North Santa Monica Boulevard 35 41,857 7.1 19.1 1,140 0.1Wilshire Boulevard 30 22,574 8.9 26.3 1,140 0.2 Total Equivalent
Trips Per Day Overlap? Overlap Trips
Equipment
Count
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day
Area Construction Phase Start Date End Date
Equipment
Count
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day
AreaArea Construction Phase Start Date End Date
Overlap? Overlap Trips
Construction Traffic Noise Calculator
Construction Phase Start Date End Date
Equipment
Count
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day Total Equivalent
Trips Per Day
Total Equivalent
Trips Per Day Overlap? Overlap Trips
f f
Construction Traffic Noise Calculator
Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
4 Linear, Drainage, Utilities, & Sub-Grade 8/21/2026 8/21/2026 4 40.00 4.00 0.00 1 44 40 105 0 145 30 8.9 26.3 Trenching 8/20/2026 8/20/2026 8 54.00 4.00 0.00 1 58 54 105 0 159 35 7.1 19.1 0 000 0 40 5.8 15.10 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 58 159 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 159 0.0North Santa Monica Boulevard 35 41,857 7.1 19.1 159 0.0Wilshire Boulevard 30 22,574 8.9 26.3 159 0.0 Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
5 Linear, Drainage, Utilities, & Sub-Grade 8/26/2026 8/27/2026 4 40.00 4.00 28.00 2 72 40 105 1,115 1,260 30 8.9 26.3 Paving 8/27/2026 8/28/2026 6 72.00 6.00 0.00 2 78 72 158 0 230 35 7.1 19.1 Trenching 8/22/2026 8/26/2026 8 54.00 4.00 0.00 3 58 54 105 0 159 40 5.8 15.1 0 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 78 1,260 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 1,260 0.2North Santa Monica Boulevard 35 41,857 7.1 19.1 1,260 0.1Wilshire Boulevard 30 22,574 8.9 26.3 1,260 0.2 Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
6 Linear, Drainage, Utilities, & Sub-Grade 8/31/2026 9/1/2026 4 52.00 4.00 10.00 2 66 52 105 398 555 30 8.9 26.3 Trenching 8/29/2026 8/31/2026 8 54.00 4.00 0.00 1 58 54 105 0 159 35 7.1 19.1 0 000 0 40 5.8 15.10 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 58 555 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 555 0.1North Santa Monica Boulevard 35 41,857 7.1 19.1 555 0.1Wilshire Boulevard 30 22,574 8.9 26.3 555 0.1 Overlap? Overlap Trips
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day Total Equivalent
Area Construction Phase Start Date End Date Trips Per Day Equipment
Count
Total Equivalent
Trips Per Day Overlap? Overlap Trips
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day Total Equivalent
Area Construction Phase Start Date End Date Trips Per Day Equipment
Count
Area Construction Phase Start Date End Date
Equipment
Count
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day
Overlap? Overlap Trips
Construction Traffic Noise Calculator
Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
7 Linear, Drainage, Utilities, & Sub-Grade 9/4/2026 9/4/2026 4 52.00 4.00 13.00 1 69 52 105 518 675 30 8.9 26.3 Trenching 9/2/2026 9/3/2026 8 54.00 4.00 0.00 2 58 54 105 0 159 35 7.1 19.1 0 000 0 40 5.8 15.10 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 58 675 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 675 0.1North Santa Monica Boulevard 35 41,857 7.1 19.1 675 0.1Wilshire Boulevard 30 22,574 8.9 26.3 675 0.1 Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
8 Linear, Drainage, Utilities, & Sub-Grade 9/7/2026 9/8/2026 2 52.00 4.00 9.00 2 65 52 105 359 516 30 8.9 26.3 Paving 9/8/2026 9/9/2026 6 72.00 6.00 0.00 2 78 72 158 0 230 35 7.1 19.1 Trenching 9/5/2026 9/7/2026 8 54.00 4.00 0.00 1 58 54 105 0 159 40 5.8 15.1 0 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 78 516 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 516 0.1North Santa Monica Boulevard 35 41,857 7.1 19.1 516 0.1Wilshire Boulevard 30 22,574 8.9 26.3 516 0.1 Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
Paving Paving 9/10/2026 9/16/2026 8 60.00 6.00 0.00 5 66 60 158 0 218 30 8.9 26.3 0 000 0 35 7.1 19.10 000 0 40 5.8 15.10 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 0 218 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 218 0.0North Santa Monica Boulevard 35 41,857 7.1 19.1 218 0.0Wilshire Boulevard 30 22,574 8.9 26.3 218 0.0 6,882
Overlap? Overlap Trips
Area Construction Phase Start Date End Date
Equipment
Count
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day Total Equivalent
Trips Per Day Overlap? Overlap Trips
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day Total Equivalent
Area Construction Phase Start Date End Date Trips Per Day Equipment
Count
Area Construction Phase Start Date End Date
Equipment
Count
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day Total Equivalent
Trips Per Day Overlap? Overlap Trips
Construction Traffic Noise Calculator
Speed (mph) MT Factor HT Factor
Worker Vendor Haul Worker Vendor Haul 25 12.6 39.8
Striping Paving 9/17/2026 9/18/2026 2 22.00 4.00 0.00 2 26 22 105 0 127 30 8.9 26.3 0 000 0 35 7.1 19.10 000 0 40 5.8 15.10 000 0 45 5.0 12.90 000 0 50 4.5 11.50 000 0 55 4.1 10.4 Maximum 0 127 60 3.7 9.6
70 3.2 8.3
Roadway Speed
Existing
Volume MT Factor HT Factor
Total
Equivalent
Vehicles
Noise
Increase
(dBA)
South Santa Monica Boulevard 25 21,270 12.6 39.8 127 0.0North Santa Monica Boulevard 35 41,857 7.1 19.1 127 0.0Wilshire Boulevard 30 22,574 8.9 26.3 127 0.0 Total Equivalent
Area Construction Phase Start Date End Date Trips Per Day Overlap? Overlap Trips Equipment
Count
One Way Trip Per Day Days per
Phase
Total Trips
Per Day
Equivalent One Way Trip Per Day

CONSTRUCTION NOISE AND VIBRATION I MPACT A NALYSIS
A UGUST 2026

ONE BEVERLY HILLS P ROJECT

BEVERLY HILLS , C ALIFORNIA
P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx (08/06/26)

ATTACHMENT E

DETAILED CONSTRUCTION PLANS
LSA
APPROVED TCP: OBH S Santa Monica TCP West of Wilshire Potholing 9:00AM - 9:00PM Day 1:
- Potholing of both vault locations & mainline conduit
- Sawcut and asphalt grinding
- Start excavation of mainline conduit trench and West Vault location - Set Plates
Day 2:
- Excavation of mainline conduit trench and West Vault location - NOVA inspection
- Mainline conduit installation
- Set Plates
Day 3:
- West Vault and mainline conduit installation
- SCE inspection
- Slurry backfill of West Vault (48-hour cure time)
- Set Plates
Day 4:
- Slurry backfill of mainline conduit & removal of West Vault shoring - Set Plates
CONSTRUCTION AREA 1
CHARLE VLLt BLVD. 2 uww
WILSHIRE BLVD. so ww
N. LINDEN DR. T llllr
S. SANTA MONICA BLVD 2» vw
WILSHIRE BLVD. zs ' vww
u--oe(Lr)¥
S. UASKY DR. z ww
----------------•-•------------te---�
¥
T
OU] S. SAN
TA MONICA BLVD 2 vw
«
OU]
CHARLEVILLE BLVD.

APPROVED TCP: OBH S Santa Monica TCP Rev10.2 9:00AM - 9:00PM Day 5: - Excavation of East Vault location- Excavation of east mainline conduit- Sawcutting, asphalt grinding of west mainline conduit- Excavation of west mainline conduit- Set Plates Day 8: - SCE Inspection- Slurry backfill west mainline conduit- Slurry backfill east mainline conduit- Set Plates Day 6: - Installation of East Vault- Installation of west mainline conduit- Installation of east mainline conduit- Set Plates Day 7: - Slurry backfill and shoring removal of East Vault- Installation of west mainline conduit- Installation of east mainline conduit- Set Plates CONSTRUCTION AREA 2
""
«€ «
S. SANTA MONICA BLVD 2» vw
a
,-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
--,POSTTAN.5.A.T
--. -
-
-
-
-
-
-
-
-
-
-
-
-
--
.p
f4"
WILSHIRE BLVD. 2» w
o-± taoee
"" "'
• WILSHIRE BLVD.

S. SANTA MONICA BLVD zs www
00' J
)+020L) +Hr2O-
«e
,
� ¢
5 om It 020-2l
T N. LINDEN DR. 2 w
CHARLEVILLE BLVD. ww
APPROVED TCP: OBH S Santa Monica TCP Rev10.2 9:00AM - 9:00PM Day 9:
- Pothole for vents
- Sawcut & grind asphalt
- Excavate vents and any remaining mainline conduit
- Set Plates
Day 10:
- Install vents
- Install any remaining mainline conduit
- Slurry backfill trench
CONSTRUCTION AREA 3
>
S. SANTA MONICA BLVD zs we
S. LASKY DR. zs vw
WILSHIRE BLVD. so we
• wo-1 tezo-2z
u4--98(LT)¥
�
WILSHIRE BLVD. 2zs ve
S. SANTA MONICA BLVD as uw
)+HW4-2(LT)
HC20(LT)
=
<d «#
=
<z
= = ◊
= =
1 •
oz0-2 ' r· N. LINDEN DR. 2s PH
H2O--1
APPROVED TCP: OBH S Santa Monica TCP Rev10.2 9:00AM - 9:00PM Day 11*:
- Pothole for Vents
- Sawcut & grind asphalt
- Excavate vents
- Set Plates
Day 12*:
- Install vents
- Slurry backfill
*all construction work associated
with vent line installation to cease
by 6:00 PM.

CONSTRUCTION AREA 4
S. SANTA MONICA BLVD 2s ve
12'
MAX
c30(c)NC3JOA(CA)
50'
�
85'

TANGENT SHIFTING TAPER
ff"Ash[
G20-2
co
co
3%
g8
4--98(L1)
l%-oe(
¥
w20--1
i
POST TAN.SAT:

TAPER
125'

MERGING TAPER
z +AW4-2(L)+HC20(L7) H
S. LASKY DR. 2s ve
CHARLEVILLE BLVD. 25 MPH
Day 13:
- Potholing of main line conduit
- Sawcut, asphalt grinding
- Set Plates
Day 14:
- Excavation of mainline conduit
- Set Plates
Day 16:
- Installation of mainline conduit
- Set Plates
Day 17:
- Slurry backfill
- Set Plates
Day 15:
- Excavation of mainline conduit
- Installation of mainline conduit
- Set Plates APPROVED TCP: OBH S Santa Monica TCP Rev10.2 9:00AM - 9:00PM Day 18:
- Base & Pave Mainline on SSMB with 48
hour cure time completed for construction
areas 1-5.

Day 19:
- Base & Pave Mainline on SSMB with 48
hour cure time completed for construction
areas 1-5.

CONSTRUCTION AREA 5
+H Cc20(RT) HW20--1
:

MIR#fo
9846
MIR#o MTR#o
9850 9848
MTR#
09857
MIR o
9852
w1-6(LT)
MIR#o
9854
MTR# MTR#
09861 09859

FAS(LT)
8 MTR# MTR#
0 9865 0986.3
MIR#o
9856
10 IN
c3o(cA)
j@so(c)
MTR#
0 9867
MIR#o
9858
MTR#
0 9869
MTR# MTR#
09875 09873
S. SANTA MONICA BLVD 2s w
(27(CA)
(c27(CA) «8]
i-----501 - •
-------------POST
--gt~pp -fRGI:NG :�T-A9f SAT.-----1----. 00-. ----00- -'\.--l -1100·7 f
20-2
MTR# MIR#
09901 09899
= =
=
=
= =
= - - - - - =
= =
= =
MIR#o
, ,
9902 III w20-1
l .co l
• G20-
e
2 ¥
w20--1
MTR#
0990.3
MIR#o
9904
MTR#
0 9905
MTR#
0 9907
MIR#o MTR#o
9908 9906
MTR#
09909
MIR#o
9912
CHARLEVILLE BLVD. 25 MPH
APPROVED TCP: OBH S Santa Monica TCP Rev9.1
Day 20 (Night work):
- Potholing of mainline conduit
- Sawcutting and asphalt grinding
- Start excavation
- Set Plates
Day 21 (Night work):
- Excavation of mainline conduit
- Installation of mainline conduit
- Set Plates
Day 22 (Night work):
- Installation of mainline conduit
- Slurry backfill
- Set Plates 9:00PM - 6:00AM
CONSTRUCTION AREA 6
N. LINDEN DR. as v
125'

MERGING TAPER
)+Hc20(L) HW2O-1
= <z «
=
= <
=
S
= ◊
=
=
3 » =
II
1"
zo-2 ¥
w20-1
,..- _- _- _- _- _- _- _- _- _- _-
--
_- _- _- _- _- _- _- _-
--
_- _- _- _- _-
-_J_
•
"' "'
WILSHIRE BLVD. 2s ve
S. SANTA MONICA BLVD 25 MPH
?t'
0omoaooooooooooooooooaoi «
=
S. LASKY DR. 2s we
,mooooooooecaaanrccooooosidp, ,

SANTA MONICA BLVD
.zr ­
R4­­7A
WILSHIRE BLVD. 2s we
� "' "'
APPROVED TCP: OBH S Santa Monica TCP Rev9.1 9:00PM - 6:00AM Day 23 (Night work):
- Potholing of mainline conduit
- Sawcutting and asphalt grinding
- Start excavation
- Set Plates
Day 24 (Night work):
- Excavation of mainline conduit
- Installation of mainline conduit
- Set Plates
Day 25 (Night work):
- Installation of mainline conduit
- Slurry backfill
- Set Plates
CONSTRUCTION AREA 7
c2oX2)
3%
¢
,I>
9 & °
+w4-2(L)+4 )H
«
i
S. LASKY DR. 2s ww
_,_ __ ,oo·_J BUFFER
»
xw1-2(2)
EX.W16-11P(2)
« «
w20--f
ooinooaoooaooomocotif'_
-u
= ='s--�------
s__= he GS) =
== -van =e
aw ocaw·"
= a'ea0000a0po0oonooooooooooon e=
,
[I
APPROVED TCP: S Santa Monica Blvd (Wilshire Crossing) Revision - 9 of 12 9:00PM - 6:00AM Day 26 (Night work):
- Potholing of mainline conduit
- Sawcutting and asphalt grinding
- Start excavation - Set Plates
Day 27 (Night work):
- Excavation of mainline conduit
- Installation of mainline conduit
- Set Plates
Day 28 (Night work):
- Installation of mainline conduit
- Slurry backfill
- Set Plates
Day 29 (Day work): - Base remaining sections starting
with Charleville and SSMB
Day 30 (Night work):
- Base remaining sections
Day 31 (Night work):
- Pave remaining sections
through Wilshire Blvd.

Day 32 (Night work):
- Pave remaining sections
through Wilshire Blvd.

Day 33 (Night work):
- Pave remaining sections
through Wilshire Blvd.

Day 38 (Night work):
- Final Striping
Day 39 (Night work):
- Final Striping
CONSTRUCTION AREA 8
-See Construction Area 5
j
EX.W11-2(2)
EX.W16--11P(2)
WILSHIRE BLVD. so vww
S. SANTA MONICA BLVD 2zs ve
l %»5o. TAPER 125'
50'
FiS(
- w1-6(R1)
G20-2
-
= ¢ca
=
R4--7A =
¢ca
-<=
¢
=
=
II I
G2\ ·2
-
E
"' g
or
o
z
Ll
o
z
- ui
4 g
� w20-1
x
Daily Work Descriptions
Project Duration
39 Working Days (33 primary construction days plus 2 final striping days and curing period between paving and permanent striping).

Average Daily Workforce
• Typical utility construction days: 20–27 personnel onsite • Vault installation and paving days: 30–36 personnel onsite • Final striping days: 11 personnel onsite
• Peak workforce: 36 personnel during roadway restoration and paving operations Activity Breakdown by Duration
Activity Type Days Active Typical Workforce Major Equipment / Vendors Utility Potholing & Conflict
Investigation 7 Days 21–27 Personnel TRUVAC HXX Hydro Vac Trucks, Excavators Saw cutting & Asphalt
Milling 7 Days 21–27 Personnel Wirtgen W 210 Fi, Connor Concrete Trench & Vault Excavation 18 Days 20–27 Personnel (2) Komatsu PC360LC Excavators, Dump Trucks
Soil Export & Hauling 18 Days 20–27 Personnel Raymond Trucking Super Ten Dump Trucks
Mainline Conduit
Installation 12 Days 14–25 Personnel Excavators, Wheel Loaders Utility Vault Installation 2 Days 19–25 Personnel Jensen Precast, Hill Crane Crane Operations 2 Days 19–25 Personnel Link-Belt 120RT Crane Slurry Backfill Operations 9 Days 20–25 Personnel Robertsons Ready Mix Aggregate Base Installation 3 Days 30–36 Personnel Vulcan Materials, Raincross Paving
Asphalt Paving &
Restoration 5 Days 30–36 Personnel AP655F Paver, Rollers, Raincross Paving Temporary Striping 1 Day Included in Paving
Operations Raincross Paving
Final Striping & Pavement
Markings 2 Days 11 Personnel PCI Striping, Graco LineLazer Equipment Traffic Control Operations 33 Active
Construction Days
2 Traffic Control
Workers Daily Roadway Traffic Control
Detailed Daily Work DescripƟon1
Day 1 Work DescripƟon – ConstrucƟon Area 1; 9:00AM – 9:00PM BALI will be performing the sawcut, asphalt grinding and recession of steel trench plates as well as potholing and trench excavaƟon.

Asphalt removal will total approximately 85 CY of asphalt.

Potholing will begin at the vault locaƟons, per SCE requirements, and progress to the trench line once vault locaƟons have been cleared of any conflicts.

Trench excavaƟon will begin and total export of the first 430 LF will total approximately 650 CY. Not all excavaƟon will occur on Day 1.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – (2) Traffic Control Laborers • Material Suppliers
o Saf-T-Co - SCE Conduit Delivery
o Trench Shoring - Steel Plate and Shoring Delivery
Day 2 Work DescripƟon – ConstrucƟon Area 1; 9:00AM – 9:00PM BALI will begin excavaƟon of the West Vault locaƟon on S. Santa Monica Blvd and conƟnue trench excavaƟon.

Vault excavaƟon export will total approximately 450 CY.

Trench excavaƟon will conƟnue, but total export is included in Day 1.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. 1 From S. Laskey Drive westward along South Santa Monica Boulevard and Charleville Boulevard, all sawcuƫng, asphalt milling, loaded truck operaƟons, hydro-excavaƟon, and paving will be performed exclusively during the City’s permiƩed construcƟon hours (8:00 a.m. to 6:00 p.m., excluding weekends and public holidays). AddiƟonally, all construcƟon work associated with the vent line installaƟon on Days 11 and 12 will be performed within the city’s permiƩed construcƟon hours and will cease by 6:00 PM. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Roadway Traffic Control – (2) Traffic Control Laborers o Nova – (1) Soils Inspector
• Material Suppliers
o Trench Shoring – Manhole Shoring Box Delivery
Day 3 Work DescripƟon – ConstrucƟon Area 1; 9:00AM – 9:00PM BALI will install and slurry backfill the West Vault and install mainline conduit.

West Vault slurry backfill to total approximately 50 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Jensen Precast
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (3) – Hill Crane
o (25) - TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Link-Belt 120 RT Hydraulic Crane
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – (1) Soils Inspector
o Hill Crane – (3) Crane Operator and Riggers
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Jensen Precast – SCE Vault Delivery
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 4 Work DescripƟon – ConstrucƟon Area 1; 9:00AM – 9:00PM BALI will slurry backfill the mainline conduit and removing the West Vault shoring from the work zone.

Slurry backfill import will total approximately 450 CY. This does not includes Crushed Miscellaneous Base or Asphalt.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Robertsons Ready Mix
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill o Trench Shoring – Manhole Shoring Box Pickup
Day 5 Work DescripƟon – ConstrucƟon Area 2; 9:00AM – 9:00PM BALI will begin with East Vault excavaƟon, excavaƟon of east mainline conduit, sawcuƫng and asphalt grinding of west mainline conduit, excavaƟon of west mainline conduit and the installaƟon of recessed steel trench plates.

Trench excavaƟon includes approximately 110 LF to conƟnue westbound on S. Santa Monica and approximately 255 LF eastbound on S. Santa Monica.

Asphalt removal will total approximately 75 CY.

Vault excavaƟon export will total approximately 450 CY.

Trench excavaƟon will total approximately 550 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (4) – Connor Concrete
o (2) – Roadway
o (24) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Nova – (1) Soils Inspector
o Connor Concrete – (4) Concrete Cuƫng and Asphalt Grinding o Roadway Traffic Control – (2) TC Laborers
Day 6 Work DescripƟon – ConstrucƟon Area 2; 9:00AM – 9:00PM BALI will be performing the installaƟon of the East Vault and mainline conduits on the east and west sides of S. Santa Monica, west of Wilshire.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Jensen Precast
o (2) – Roadway
o (3) – Hill Crane
o (19) - TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Link-Belt 120 RT Hydraulic Crane
• Subcontractors
o Nova – (1) Soils Inspector
o Hill Crane – (3) Crane Operator and Riggers
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Jensen Precast – SCE Vault Delivery
Day 7 Work DescripƟon – ConstrucƟon Area 2; 9:00AM – 9:00PM BALI will be performing the slurry backfill and shoring removal of the East Vault as well as the installaƟon of west and east mainline conduit.

East Vault slurry backfill to total approximately 50 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill o Trench Shoring – Manhole Shoring Box Pickup
Day 8 Work DescripƟon – ConstrucƟon Area 2; 9:00AM – 9:00PM BALI will be performing slurry backfill of the west and east mainline conduit trenches.

Slurry to total approximately 450 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 9 Work DescripƟon – ConstrucƟon Area 3; 9:00AM – 9:00PM BALI will be performing the potholing, sawcuƫng and asphalt grinding for the East Vault vent lines. BALI will also perform the excavaƟon of the vent lines.

Asphalt removal to total approximately 6 CY.

Trench excavaƟon export to total approximately 65 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (4) – Raymond Trucking
o (2) – Roadway
o (21) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Roadway Traffic Control – (2) Traffic Control Laborers Day 10 Work DescripƟon – ConstrucƟon Area 3; 9:00AM – 9:00PM BALI will perform the installaƟon and slurry backfill of the vent lines.

Slurry backfill import to total approximately 55 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 11 Work DescripƟon – ConstrucƟon Area 4; 9:00AM – 9:00PM* BALI will perform the potholing of the West Vault vent lines, including the sawcut, asphalt grinding and excavaƟon of the vent lines.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. *All construcƟon work associated with vent line installaƟon to cease by 6:00PM • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - (2) Sawcut Equipment with Operators o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – (2) TC Laborers
Day 12 Work DescripƟon – ConstrucƟon Area 4; 9:00AM – 9:00PM* BALI will perform the installaƟon and backfill of the vent line conduits.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. *All construcƟon work associated with vent line installaƟon to cease by 6:00PM • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 13 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform the potholing, sawcuƫng and asphalt grinding of the mainline conduit on the north end of Charleville Blvd.

Asphalt export to total approximately 15 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut Equipment with Operators
o Raymond Trucking - Super Ten Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – Traffic Control Laborers
Day 14 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform the excavaƟon of the mainline conduit on the north end of Charleville Blvd.

ExcavaƟon export to total approximately 150 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (2) – Roadway
o (19) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut Equipment with Operators
o Raymond Trucking - Super Ten Dump Truck with Operators o Roadway Traffic Control – Traffic Control Laborers
Day 15 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will conƟnue to perform the excavaƟon of the mainline conduit on the north end of Charleville Blvd.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (2) – Roadway
o (1) – Nova InspecƟon
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut Equipment with Operators
o Raymond Trucking - Super Ten Dump Truck with Operators o Roadway Traffic Control – Traffic Control Laborers
o Nova – Soils InspecƟon
Day 16 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform the installaƟon of mainline conduit on the north end of Charleville Blvd.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (2) – Roadway
o (1) – Nova InspecƟon
o (14) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
• Subcontractors
o Roadway Traffic Control – Traffic Control Laborers
o Nova – Soils InspecƟon
Day 17 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform the slurry backfill of the excavaƟon on the north end of Charleville Blvd.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 18 Work DescripƟon – ConstrucƟon Areas 1-5; 9:00AM – 9:00PM BALI will install the Crushed Miscellaneous Base and Asphalt beginning with ConstrucƟon Area 1 of the Traffic Control Plans and advancing traffic control throughout the shiŌ as secƟons are completed.

Crushed Miscellaneous Base to total approximately 68 CY.

Asphalt to total approximately 180 CY.

Recessed steel plates to be installed at the end of every shiŌ, where base and asphalt was not completed, to allow for vehicular traffic.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Vulcan
o (6) – Blue Diamond
o (10) – Raincross Paving
o (36) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
(1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Vulcan – Aggregate Base Material
o Blue Diamond – Asphalt
Day 19 Work DescripƟon – ConstrucƟon Areas 1-5; 9:00AM – 9:00PM BALI will install the Crushed Miscellaneous Base and Asphalt compleƟng the ConstrucƟon Areas west of Wilshire.

Temporary striping will be installed at the end of the shiŌ to allow for the 5-day cure Ɵme before final striping is applied.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Vulcan
o (6) – Blue Diamond
o (10) – Raincross Paving
o (36) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Vulcan – Aggregate Base Material
o Blue Diamond – Asphalt
Day 20 Work DescripƟon – ConstrucƟon Area 6; 9:00PM – 6:00AM BALI will perform the potholing, sawcuƫng, asphalt grinding and excavaƟon of the Wilshire crossing.

Asphalt export to total 14 CY.

Trench excavaƟon export to total 85 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – (2) Traffic Control Laborers Day 21 Work DescripƟon – ConstrucƟon Area 6; 9:00PM – 6:00AM BALI will perform the excavaƟon and installaƟon of the mainline conduit.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Roadway Traffic Control – (2) Traffic Control Laborers o Nova – (1) Soils Inspector
Day 22 Work DescripƟon – ConstrucƟon Area 6; 9:00PM – 6:00AM BALI will perform conduit installaƟon and slurry backfill of the mainline conduit.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
• BALI Equipment
o (2) F550 UƟlity Truck
o (2) 80k Excavator
• Subcontractors
o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Nova – (1) Soils Inspector
o Roadway Traffic Control – (2) TC Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 23 Work DescripƟon – ConstrucƟon Area 7; 9:00PM – 6:00AM BALI will perform potholing, sawcuƫng, asphalt grinding and excavaƟon in the middle secƟon of the Wilshire crossing.

Asphalt export to total approximately 10 CY.

Trench excavaƟon export to total approximately 60 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – (2) Traffic Control Laborers Day 24 Work DescripƟon – ConstrucƟon Area 7; 9:00PM – 6:00AM BALI will perform the excavaƟon and installaƟon of the mainline conduit.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Roadway Traffic Control – (2) Traffic Control Laborers o Nova – (1) Soils Inspector
Day 25 Work DescripƟon – ConstrucƟon Area 7; 9:00PM – 6:00AM BALI will perform the installaƟon and slurry backfill of the mainline conduit.

Slurry backfill import to total approximately 55 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
• BALI Equipment
o (2) F550 UƟlity Truck
o (2) 80k Excavator
• Subcontractors
o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Nova – (1) Soils Inspector
o Roadway Traffic Control – (2) TC Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 26 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI will perform the potholing, sawcuƫng, asphalt grinding and excavaƟon for the mainline conduit.

Asphalt export to total approximately 10 CY.

Trench excavaƟon export to total approximately 60 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (sawcuƫng and asphalt milling)
o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - Super 10 Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – Traffic Control Laborers
Day 27 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI will perform the excavaƟon and installaƟon of the mainline conduit.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - Super 10 Dump Truck with Operators o Roadway Traffic Control – Traffic Control Laborers
o Nova – Soils Inspector
Day 28 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI will perform the installaƟon and slurry backfill of mainline conduit.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
• BALI Equipment
o (2) F550 UƟlity Truck
o (2) 80k Excavator
• Subcontractors
o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Nova – (1) Soils Inspector
o Roadway Traffic Control – (2) TC Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 29 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform Crushed Miscellaneous Base installaƟon on secƟons of the Traffic Control plan that had not been previously completed, specifically ConstrucƟon Area 5.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Vulcan
o (6) – Blue Diamond
o (10) – Raincross Paving
o (36) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Vulcan – Aggregate Base Material
o Blue Diamond – Asphalt
Day 30 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI will perform Crushed Miscellaneous Base installaƟon on secƟons of the Traffic Control plan that had not been previously completed.

Crushed Miscellaneous Base import to total approximately 5 CY.

Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Vulcan
o (10) – Raincross Paving
o (30) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Vulcan – Aggregate Base Material
Day 31 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI to asphalt pave the secƟons through the Wilshire crossing.

Asphalt import to total approximately 20 CY for Wilshire crossing.

Recessed steel plates to be installed at the end of every shiŌ, where asphalt was not completed, to allow for vehicular traffic.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Blue Diamond
o (10) – Raincross Paving
o (30) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Blue Diamond – Asphalt
Day 32 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI to asphalt pave the secƟons through the Wilshire crossing.

Recessed steel plates to be installed at the end of every shiŌ, where asphalt was not completed, to allow for vehicular traffic.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Blue Diamond
o (10) – Raincross Paving
o (30) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Blue Diamond – Asphalt
Day 33 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI to asphalt pave the secƟons through the Wilshire crossing.

Recessed steel plates to be installed at the end of every shiŌ, where asphalt was not completed, to allow for vehicular traffic.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Blue Diamond
o (10) – Raincross Paving
o (30) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Blue Diamond – Asphalt
Day 38 Work DescripƟon – ConstrucƟon Areas 1-8; 9:00PM – 6:00AM BALI to perform final striping for ConstrucƟon Areas 1 through 8. • Crew Members
o (5) – Foreman, Operators, Laborers
o (2) – Roadway
o (4) – PCI
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Graco LineLazer V 5900
• Subcontractors
o PCI – Pavement Markings and Lane Striping
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
Day 39 Work DescripƟon – ConstrucƟon Areas 1-8; 9:00PM – 6:00AM BALI to perform final striping for ConstrucƟon Areas 1 through 8. • Crew Members
o (5) – Foreman, Operators, Laborers
o (2) – Roadway
o (4) – PCI
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Graco LineLazer V 5900
• Subcontractors
o PCI – Pavement Markings and Lane Striping
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers

CONSTRUCTION NOISE AND VIBRATION I MPACT A NALYSIS
A UGUST 2026

ONE BEVERLY HILLS P ROJECT

BEVERLY HILLS , C ALIFORNIA
P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx (08/06/26)

ATTACHMENT F

DAILY CONSTRUCTION NOISE LEVELS
LSA
Day Equipment Hours Equipment FHWA Equipment Quantity
Quantity
During Active
Construction
Reference
Noise Level
(dBA Lmax)
Acoustical Use
Factor (%) Lmax Leq
Highest
Noise Level within
the Permitted
Construction Hours
(dBA Leq)
Highest
Noise Level Outside
the Permitted
Construction Hours
(dBA Leq)
1 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 83.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Wirtgen W 210 FI 1 1 77.3 40 77.3 73.3 9:00 AM to 6:00 PM TRUVAC HXX Hydro Excavation Vacuum Excavator (Vac-truck) 2-3 1 85.0 40 85.0 81.09:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 AM to 6:00 PM Sawcut Concrete Saw 1 1 90.0 20 90.0 83.0 2 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 80.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 3 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 81.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Link-Belt 120 RT Hydraulic Crane Crane 1 1 85.0 16 85.0 77.09:00 AM to 6:00 PM Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck Concrete Mixer Truck 6 1 85.0 40 85.0 81.0 4 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 81.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck Concrete Mixer Truck 6 1 85.0 40 85.0 81.0 5 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 80.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Wirtgen W 210 FI (asphalt milling) 1 1 77.3 40 77.3 73.3 9:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 6 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 77.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Link-Belt 120 RT Hydraulic Crane Crane 1 1 85.0 16 85.0 77.0 7 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 81.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck Concrete Mixer Truck 6 1 85.0 40 85.0 81.0 8 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 81.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck Concrete Mixer Truck 6 1 85.0 40 85.0 81.0 9 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 83.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Wirtgen W 210 FI (asphalt milling) 1 1 77.3 40 77.3 73.3 9:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 AM to 6:00 PM Sawcut Concrete Saw 1 1 90.0 20 90.0 83.0 10 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 81.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck Concrete Mixer Truck 6 1 85.0 40 85.0 81.0 Daily Construction Noise Levels
Day Equipment Hours Equipment FHWA Equipment Quantity
Quantity
During Active
Construction
Reference
Noise Level
(dBA Lmax)
Acoustical Use
Factor (%) Lmax Leq
Highest
Noise Level within
the Permitted
Construction Hours
(dBA Leq)
Highest
Noise Level Outside
the Permitted
Construction Hours
(dBA Leq)
Daily Construction Noise Levels
11 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 83.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Wirtgen W 210 FI 1 1 77.3 40 77.3 73.3 9:00 AM to 6:00 PM TRUVAC HXX Hydro Excavation Vacuum Excavator (Vac-truck) 2-3 1 85.0 40 85.0 81.09:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 AM to 6:00 PM Sawcut Concrete Saw 1 1 90.0 20 90.0 83.0 12 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 81.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck Concrete Mixer Truck 6 1 85.0 40 85.0 81.0 13 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 83.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Wirtgen W 210 FI 1 1 77.3 40 77.3 73.3 9:00 AM to 6:00 PM TRUVAC HXX Hydro Excavation Vacuum Excavator (Vac-truck) 2-3 1 85.0 40 85.0 81.09:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 AM to 6:00 PM Sawcut Concrete Saw 1 1 90.0 20 90.0 83.0 14 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 83.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 AM to 6:00 PM Sawcut Concrete Saw 1 1 90.0 20 90.0 83.0 15 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 83.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 AM to 6:00 PM Sawcut Concrete Saw 1 1 90.0 20 90.0 83.0 16 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 66.3 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 17 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 81.0 66.3 9:00 AM to 9:00 PM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck Concrete Mixer Truck 6 1 85.0 40 85.0 81.0 18 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 82.0 63.3 9:00 AM to 6:00 PM Caterpillar AP655F Asphalt Paver Paver 1 1 85.0 50 85.0 82.09:00 AM to 6:00 PM BOMAG BW900-50 Roller 1 1 85.0 20 85.0 78.09:00 AM to 6:00 PM Elgin Pelican Street Sweeper Vacuum Street Sweeper 1 1 80.0 10 80.0 70.09:00 AM to 9:00 PM Caterpillar 272D3 Skid Steer 1 1 67.3 40 67.3 63.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 AM to 9:00 PM Kenworth T800 Water Truck Pickup Truck 1 1 55.0 40 55.0 51.0 19 9:00 AM to 9:00 PM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 82.0 63.3 9:00 AM to 6:00 PM Caterpillar AP655F Asphalt Paver Paver 1 1 85.0 50 85.0 82.09:00 AM to 6:00 PM BOMAG BW900-50 Roller 1 1 85.0 20 85.0 78.09:00 AM to 6:00 PM Elgin Pelican Street Sweeper Vacuum Street Sweeper 1 1 80.0 10 80.0 70.09:00 AM to 9:00 PM Caterpillar 272D3 Skid Steer 1 1 67.3 40 67.3 63.39:00 AM to 9:00 PM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 AM to 9:00 PM Kenworth T800 Water Truck Pickup Truck 1 1 55.0 40 55.0 51.0 Day Equipment Hours Equipment FHWA Equipment Quantity
Quantity
During Active
Construction
Reference
Noise Level
(dBA Lmax)
Acoustical Use
Factor (%) Lmax Leq
Highest
Noise Level within
the Permitted
Construction Hours
(dBA Leq)
Highest
Noise Level Outside
the Permitted
Construction Hours
(dBA Leq)
Daily Construction Noise Levels
20 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 83.0 9:00 PM to 6:00 AM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Wirtgen W 210 FI 1 1 77.3 40 77.3 73.3 9:00 PM to 6:00 AM TRUVAC HXX Hydro Excavation Vacuum Excavator (Vac-truck) 2-3 1 85.0 40 85.0 81.09:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 PM to 6:00 AM Sawcut Concrete Saw 1 1 90.0 20 90.0 83.0 21 9:00 PM to 6:00 AM Ford F550 Utility Truck Dump Truck 2 1 84.0 40 84.0 80.0 80.0 9:00 PM to 6:00 AM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 22 9:00 PM to 6:00 AM Ford F550 Utility Truck Dump Truck 2 1 84.0 40 84.0 80.0 81.0 9:00 PM to 6:00 AM 80k Excavator Excavator 2 1 85.0 40 85.0 81.0 23 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 83.0 9:00 PM to 6:00 AM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Wirtgen W 210 FI 1 1 77.3 40 77.3 73.3 9:00 PM to 6:00 AM TRUVAC HXX Hydro Excavation Vacuum Excavator (Vac-truck) 2-3 1 85.0 40 85.0 81.09:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 PM to 6:00 AM Sawcut Concrete Saw 1 1 90.0 20 90.0 83.0 24 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 80.0 9:00 PM to 6:00 AM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 25 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 81.0 9:00 PM to 6:00 AM 80k Excavator Excavator 2 1 85.0 40 85.0 81.0 26 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 83.0 9:00 PM to 6:00 AM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Wirtgen W 210 FI 1 1 77.3 40 77.3 73.3 9:00 PM to 6:00 AM TRUVAC HXX Hydro Excavation Vacuum Excavator (Vac-truck) 2-3 1 85.0 40 85.0 81.09:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 PM to 6:00 AM Sawcut Concrete Saw 1 1 90.0 20 90.0 83.0 27 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 80.0 9:00 PM to 6:00 AM Komatsu PC360-LC Hydraulic Excavator 2 1 70.3 40 70.3 66.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 28 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 81.0 9:00 PM to 6:00 AM 80k Excavator Excavator 2 1 85.0 40 85.0 81.0 29 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 82.0 63.3 9:00 AM to 6:00 PM Caterpillar AP655F Asphalt Paver Paver 1 1 85.0 50 85.0 82.09:00 AM to 6:00 PM BOMAG BW900-50 Roller 1 1 85.0 20 85.0 78.09:00 AM to 6:00 PM Elgin Pelican Street Sweeper Vacuum Street Sweeper 1 1 80.0 10 80.0 70.09:00 PM to 6:00 AM Caterpillar 272D3 Skid Steer 1 1 67.3 40 67.3 63.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 AM to 6:00 PM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 PM to 6:00 AM Kenworth T800 Water Truck Pickup Truck 1 1 55.0 40 55.0 51.0 Day Equipment Hours Equipment FHWA Equipment Quantity
Quantity
During Active
Construction
Reference
Noise Level
(dBA Lmax)
Acoustical Use
Factor (%) Lmax Leq
Highest
Noise Level within
the Permitted
Construction Hours
(dBA Leq)
Highest
Noise Level Outside
the Permitted
Construction Hours
(dBA Leq)
Daily Construction Noise Levels
30 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 82.0 9:00 PM to 6:00 AM Caterpillar AP655F Asphalt Paver Paver 1 1 85.0 50 85.0 82.09:00 PM to 6:00 AM BOMAG BW900-50 Roller 1 1 85.0 20 85.0 78.09:00 PM to 6:00 AM Elgin Pelican Street Sweeper Vacuum Street Sweeper 1 1 80.0 10 80.0 70.09:00 PM to 6:00 AM Caterpillar 272D3 Skid Steer 1 1 67.3 40 67.3 63.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 PM to 6:00 AM Kenworth T800 Water Truck Pickup Truck 1 1 55.0 40 55.0 51.0 31 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 82.0 9:00 PM to 6:00 AM Caterpillar AP655F Asphalt Paver Paver 1 1 85.0 50 85.0 82.09:00 PM to 6:00 AM BOMAG BW900-50 Roller 1 1 85.0 20 85.0 78.09:00 PM to 6:00 AM Elgin Pelican Street Sweeper Vacuum Street Sweeper 1 1 80.0 10 80.0 70.09:00 PM to 6:00 AM Caterpillar 272D3 Skid Steer 1 1 67.3 40 67.3 63.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 PM to 6:00 AM Kenworth T800 Water Truck Pickup Truck 1 1 55.0 40 55.0 51.0 32 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 82.0 9:00 PM to 6:00 AM Caterpillar AP655F Asphalt Paver Paver 1 1 85.0 50 85.0 82.09:00 PM to 6:00 AM BOMAG BW900-50 Roller 1 1 85.0 20 85.0 78.09:00 PM to 6:00 AM Elgin Pelican Street Sweeper Vacuum Street Sweeper 1 1 80.0 10 80.0 70.09:00 PM to 6:00 AM Caterpillar 272D3 Skid Steer 1 1 67.3 40 67.3 63.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 PM to 6:00 AM Kenworth T800 Water Truck Pickup Truck 1 1 55.0 40 55.0 51.0 33 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 1 55.0 40 55.0 51.0 82.0 9:00 PM to 6:00 AM Caterpillar AP655F Asphalt Paver Paver 1 1 85.0 50 85.0 82.09:00 PM to 6:00 AM BOMAG BW900-50 Roller 1 1 85.0 20 85.0 78.09:00 PM to 6:00 AM Elgin Pelican Street Sweeper Vacuum Street Sweeper 1 1 80.0 10 80.0 70.09:00 PM to 6:00 AM Caterpillar 272D3 Skid Steer 1 1 67.3 40 67.3 63.39:00 PM to 6:00 AM Caterpillar 924H Wheel Loader 1-2 1 66.3 40 66.3 62.3 9:00 PM to 6:00 AM Super 10 Dump Truck Dump Truck 6 1 84.0 40 84.0 80.0 9:00 PM to 6:00 AM Kenworth T800 Water Truck Pickup Truck 1 1 55.0 40 55.0 51.0 34-37 Curing period
38 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 2 55 40 58.0 54.0 59.9 9:00 PM to 6:00 AM Graco LineLazer V 5900 2 2 60.9 40 63.9 59.9 39 9:00 PM to 6:00 AM Ford F550 Utility Truck Pickup Truck 2 2 55 40 58.0 54.0 59.9 9:00 PM to 6:00 AM Graco LineLazer V 5900 2 2 60.9 40 63.9 59.9