AGENDA REPORT
Meeting Date: September 22, 2026
Item Number:
To: Honorable Mayor & City Council
From: Daren Grilley, City Engineer/Assistant Director of Public Works Samer Elayyan, Engineering Services Manager
Andre Sahakian, Project Manager
Subject: APPEAL OF CITY ENGINEER'S AUGUST 7, 2026 DECISION TO
ISSUE AN EXCAVATION PERMIT TO ALLOW INSTALLATION OF
SOUTHERN CALIFORNIA EDISON ELECTRICAL UTILITY
INFRASTRUCTURE ALONG SOUTH SANTA MONICA
BOULEVARD FROM WILSHIRE BOULEVARD TO CHARLEVILLE
BOULEVARD
Attachments: 1. Appeal Petition
2. Excavation Permit PW2600515
3. Addendum #4 to the One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report
RECOMMENDATION
Staff recommends that City Council:
1) Hold a public hearing to consider the appeal of Excavation Permit (PW2600515); and
2) Deny the appeal and uphold issuance of Excavation Permit PW2600515.
INTRODUCTION
The subject of this appeal is an Excavation Permit issued by the Public Works Department for the installation of Southern California Edison (SCE) electrical utility infrastructure along South Santa Monica Boulevard from Wilshire Boulevard to Charleville Boulevard. The upgraded electrical infrastructure will serve the One Beverly Hills Project at 9900 Wilshire Boulevard and will be part of SCE’s Executive Circuit which serves the western portion of the City.
On August 14, 2026, Victor De la Cruz of Mannatt, Phelps & Phillips, LLP, on behalf of The Belvedere Hotel Partnership dba The Peninsula Beverly Hills, filed an appeal of the Meeting Date: September 22, 2026
issuance of the Excavation Permit (Attachment 1). The appeal alleges that the extent and duration of the construction would create unacceptable operational, scheduling, noise, vibration, traffic, and reputational impacts to the Peninsula hotel. The appeal also alleges that the location of the SCE utility alignment violates conditions of approval associated with the 9900 Wilshire project entitlements, and that further environmental analysis is required.
On September 1, 2026, the City Council scheduled a public hearing for September 22, 2026 for the Council to consider the appeal.
DISCUSSION
On August 7, 2026, the Public Works Department in conjunction with Community Development Major Projects issued an Excavation Permit (Attachment 2) to allow excavation and installation of SCE electrical conduit and vaults within the public right of way along South Santa Monica Boulevard from the intersection of Wilshire Boulevard to the intersection of Charleville Boulevard. The utilities proposed under the permit in question are associated with the Edison infrastructure upgrades required to provide service to the One Beverly Hills project.
Right-of-Way Permitting Process
Work within the public right-of-way — including the installation of underground electrical conduit, vaults, and related facilities — requires an excavation permit issued by the Public Works Department under Beverly Hills Municipal Code (BHMC) Title 8, Chapter 2.
In carrying out the application review for an excavation permit, staff evaluates how the proposed work interacts with existing utilities and the available right-of-way, including roadway capacity and corridor limitations. Staff reviews the proposed alignment and supporting traffic control plans, identifies required traffic-control measures and construction scheduling, determines appropriate notification and outreach to affected businesses and residents, reviews any applicable environmental documents, and evaluates the adjustments or concessions necessary to minimize impacts to the public.
Conditions of approval are attached to the permit to carry those requirements into the field.
Specifically regarding the review of excavation permits for utilities, the City’s role in permit plan review is not to evaluate the utility’s proposed engineering solution, but to exercise the City’s responsibility as steward of the public right-of-way, confirming that the proposed installation can be accommodated within the right-of-way and requiring reasonable, justified adjustments to the plan or conditions for the work where necessary to protect the right-of-way, traffic, access, safety, the environment and other public needs.
Typical items considered during the review include, but are not limited to, the following:
Contractor licensing appropriate to the scope of work Insurance certificates and bonds
Correct permit type/class for the scope; fees and deposits collected Other required permits/approvals identified (encroachment, building, hauling, dewatering)
Stormwater erosion control Best Management Practices (BMPs) Dust, noise, and hours-of-work ordinance compliance; sanitation/refuse continuity Existing utility locations and required horizontal/vertical clearances (water, sewer, storm, gas, electric, and communications)
Meeting Date: September 22, 2026
Depth of cover, bedding, and backfill specifications; siting of vaults/boxes/manholes clear of other facilities and their access Trench section, excavation safety/shoring, and traffic/structural loading appropriate to the location
Connection/tap approvals and inspection requirements where tying into City mains Curb ramp, driveway, sidewalk, and curb-and-gutter impacts Tree protection zones and Arborist coordination if street tree roots may be impacted
Impacts to roadway pavement, sidewalks, signs, striping, signals, streetlights, and other surface assets
Traffic impacts and adequate traffic control plan per the Manual on Uniform Traffic Control Devices (MUTCD) and City standards; approved lane/parking closures, work hours, and haul routes
Vehicular travel and emergency access; property, driveway, and business access Mitigation measures, if any
Americans with Disabilities Act (ADA)-compliant pedestrian access maintained during construction, including detours and temporary accommodations; transit stop and loading-zone impacts addressed
No-parking posting protocol and required notifications Pavement moratorium; trench cut policy/T-section restoration Restoration to City standard with warranty and guarantee; dig-out/repave limits; ADA upgrades as required by Public Right-of-Way Accessibility Guidelines (PROWAG)
Review of Permit PW2600515
Proposed Work
Utility infrastructure (e.g., water, sewer, power, gas, telecommunications) is designed and engineered by the utility provider. As the responsible engineer for its own facilities, SCE retains authority over the engineering design of its electrical system, and applicants bring forward an SCE-engineered plan set for the City’s review.
The proposed work consists of the installation of approximately 795 linear feet of underground electrical conduit and two underground electrical vaults within South Santa Monica Boulevard between Wilshire Boulevard and Charleville Boulevard, together with approximately 50 linear feet of conduit within Charleville Boulevard. The vaults are precast concrete structures (7′ × 14′ × 8′), one located toward the Wilshire Boulevard end of the segment and one toward the Charleville Boulevard end. The proposed work is estimated to take 39 days (35 active construction days) to complete.
The project plans were prepared by a third-party designer approved by SCE and were subsequently reviewed and approved by SCE. As the responsible engineer for its facilities, SCE determines the routing of its electrical infrastructure. The alignment along South Santa Monica Boulevard was presented to the City as SCE’s preferred alignment.
Traffic and Right-of-Way Considerations
Two major-intersection crossings were central to the alignment evaluation: a potential crossing of North Santa Monica Boulevard and the crossing of Wilshire Boulevard at South Santa Monica Boulevard. The alignment was evaluated based on many factors, including, but not limited to, roadway capacity, traffic volumes, duration of construction, and impacts to major intersections.
Meeting Date: September 22, 2026
Although the alignment was originally proposed by SCE, it minimizes overnight impacts to residences. Approximately half of the alignment was anticipated to require daytime construction. Locating this longer-duration work on the lower-volume roadway (South Santa Monica Boulevard traffic volume is around 50% of the traffic volume on North Santa Monica Boulevard) would reduce impacts to the traveling public and the surrounding street network.
The alignment also has pavement-management benefits for the preservation of public roadway infrastructure. The intersection of North Santa Monica Boulevard, including the intersection with Wilshire Boulevard, was reconstructed about seven years ago and is not anticipated to require resurfacing for several more years; whereas Wilshire Boulevard, including the intersection of South Santa Monica Boulevard, is part of an active project by the City and is scheduled to be resurfaced this fall. Sequencing the proposed SCE utility work ahead of the programmed resurfacing avoids trenching and patching newer pavement and yields a uniform, long-lasting final roadway surface.
City-Required Design Refinement
During the City’s review, the City required that the SCE vaults and access hatches be relocated to fall within a single travel lane rather than straddling two travel lanes. This adjustment was intended to minimize future traffic impacts by allowing routine maintenance and emergency access to be accommodated within a single, more contained work area, reducing the extent of lane closures required over the life of the facilities.
Specific Plan Condition
In the appeal, Mr. De la Cruz has cited to a condition in the superseded Specific Plan for the 9900 Wilshire project. He argues that the condition limits utility work to the adjacent streets and alleys.
Of course, that condition was placed on a different project, and that project is not moving forward. However, there is a similar condition the One Beverly Hills Overlay Specific Plan.
That condition reads: “[t]he Developer shall underground, if necessary, the utilities in adjacent street and alleys per requirements of the Utility Company and the City.” (Condition 18 of the Standard Conditions).
This standard condition is not meant to limit utility work to adjacent streets and alleys but instead to require a developer, if necessary, to underground those utilities that are located adjacent to the project.
Environmental Assessment
Since the work authorized by the permit is part of the implementation of the One Beverly Hills Overlay Specific Plan, environmental assessment pursuant to the California Environmental Quality Act (CEQA) was substantially covered by the previously certified Final Supplemental Environmental Impact Report (SEIR) for the project. In order to ensure that the scope of work for this SCE segment did not require any additional environmental review, Addendum #4 to the SEIR (Attachment 3) was prepared to study potential impacts.
Addendum #4 found that no new information would suggest that the project will have one or more significant effects not previously discussed in the SEIR; significant effects previously examined will not be substantially more severe than shown in the SEIR; there were no mitigation measures or alternatives previously found not to be feasible, which would in fact be feasible and would substantially reduce one or more significant effects of the project; and there are no new mitigation measures or alternatives, which are Meeting Date: September 22, 2026
considerably different from those analyzed in the SEIR that would substantially reduce one or more significant effects on the environment.
Conditions to Minimize Impacts
The permit was issued with conditions directed at minimizing construction impacts to adjacent properties and the traveling public. The construction impacts identified in the appeal — including noise, vibration, traffic, and access — were analyzed in Addendum #4 to the SEIR, and, even though they are not considered new or substantially more severe significant impacts, they are addressed through these conditions of approval.
Conclusion
Based on the foregoing discussion, staff believes that Excavation Permit PW2600515 was reviewed and issued appropriately and in accordance with BHMC Title 8, Chapter 2.
Furthermore, staff believes that the proposed alignment is appropriately accommodated within the public right-of-way in a manner that protects the public infrastructure investment, and that the proposed construction impacts were evaluated and adequate conditions were applied to the permit and associated traffic control plan to minimize those impacts on nearby properties and the traveling public. Staff therefore recommends that City Council deny the appeal and uphold issuance of Excavation Permit PW2600515.
FISCAL IMPACT
There is no anticipated fiscal impact to the City.
Shana Epstein,
Director of Public Works
Approved By
Attachment 1
APPEAL TO
PLEASE TYPE OR PRINT CLEARLY
COMMISSION ORUNIL ircle one)
Date
In accordance with the appeals procedure as authorized by the provisions of the Beverly Hills Municipal Code, the undersigned hereby appeals from the decision of e cIt, (Official, Board Commission, or City Council involved) rendered on ; which decision consisted of: The grounds submitted for this appeal are as follows: (WARNING: State all groundsfor appeaL Describe how decision is inconsistent with law. Use extra paper ifnecessary.) ‘ee. q#4Ci-1ed.
The undersigned discussed the decision being appealed with:
&gf(e/ C’iYkv 4,.., Petchi q n (Department Heicf(s) Involved) 6oL1,h,Lariy b.1,,,e,- on ‘/lI/2o 21, Date and place for the hearing on this appeal before the City Council be mi1PL# 4’P’/l’p’i LJP
D k Cz Cen+ Ik 6ir1, SiiI*C 1700, Los 4aIcj CA c,%7
Signature of appealii
Address
(Io 3ia3o’Telephone Number & Fax Numer
/1o)isi2’I-. fa,c
Fee Paid (For City Clerk’s use) DATE RECEIVED (tirnestamp below):
LOG NO. Written Notice mailed to appellant:
Copies to: City Council, City Manager, City Attorney,
REV HILLS CITY CLERK
2026 flUG Fl PH3l
APPEAL PETITIONS MUST BE FILED WITH THE CITY CLERK’S OFFICE WITHIN 14 CALENDAR DAYS AFTER THE DATE OF THE DECISION
4 It is requested that written notice of the timesent to:
Name Address cfnqlf.. c.,y,
oç qov€.
Involved Department
APPEAL PETITIONS MUST BE FILED WITH THE CITY CLERK'S OFFICE WITHIN 14 CALENDAR DAYS AFTER THE DATE OF THE DECISION
PLEASE TYPE OR PRINT CLEARLY
APPEAL TO COMMISSION OR6j-,Y coUNOillircle one)
«/y/2a%
Date
In accordance with the appeals procedure as authorized by the provisions of the Beverly Hills Municipal Code, the undersigned hereby appeals from the decision of ./1,,e, C, 6 Q� (Official, Board Commission, or City Council involved) rendered on @_'7/; r;which decision consisted of: The grounds submitted for this appeal are as follows: (WARNING: State all grounds for appeal. Describe how decision is inconsistent with law. Use extra paper if necessary.) See a#rahed.
The undersigned discussed the decision being appealed with:
llarea (alley, 4A4ea et4an, 6yso 6okch, la«y lhenet on _8/11/202% (Department Held(s) Involved) I Date It is requested that written notice of the time and place for the hearing on this appeal before the City Council be sent to: mna#,ekctillps,LL-P
la 2o Cen}cs Wad Est, Site /700, Lat th+:le, Cn 067
Name anal}.con
Address
(3to) 31a-130s-de /@)e-582)-€ax
Telephone Number & Fax Numer
Fee Paid
LOG NO. ----
(For City Clerk's use)
Written Notice mailed to appellant:
DA TE RECEIVED (timestamp below):
BEU HILLS CITY CLERK
2026 9UG 14 +3:44
Copies to: City Council, City Manager, City Attorney, _ Involved Department
Victor De Ia Cruz
r’nafla
[email protected]
August 14, 2026
Mayor Corman and Councilmembers
City of Beverly Hills
455 N. Rexford Drive
Beverly Hills, CA 90210
Re: Appeal of Permit PW2600515 for Off-Site Electrical Infrastructure — One Beverly Hills Project
Dear Honorable Mayor Corman and City Council:
This firm represents The Belvedere Hotel Partnership dba The Peninsula Beverly Hills (the “Peninsula”). Pursuant to Beverly Hills Municipal Code (“BHMC”) Sections 8-2-19 and 1- 4-101, on behalf ofthe Peninsula, we are appealing Permit PW2600515 (Exhibit A), which was issued to the developer ofthe One Beverly Hills project, Cain International (“Cain”), on Friday, August 7, 2026. The Permit authorizes trenching and installation of off-site electrical infrastructure within the South Santa Monica Boulevard public right-of-way for the One Beverly Hills project (the “Proposed Work”) directly in front of the Peninsula. In compliance with BHMC Section 1-4-101(C), on August 11, 2026, this firm notified the City Engineer and City Manager in the presence of the City Attorney that it would be filing the subject appeal. The City Attorney confirmed that such oral notification satisfied the condition precedent in BHMC Section 1-4-10 1(C) for filing this appeal.
The Peninsula has made it eminently clear to the City and Cain on various occasions that the significant period oftime that South Santa Monica Boulevard would be subject to lane closures and construction for the Proposed Work would create unacceptable operational and scheduling problems, including violations of existing commitments to guests and hotel partners.
The significant and untenable noise, vibration, and traffic impacts on the Peninsula’s guestswould further create immense reputational damage and financial harm to the Peninsula. With the Peninsula’s Verandah Room being directly on South Santa Monica Boulevard, for example, scheduled weddings, conferences, and events would likely be cancelled, and in turn, this wouldresult in significant room blocks (often forty-plus rooms) being cancelled too. Further, partnerssuch as American Express and Chase Visa require significant advance notice of any renovationsor disruptions that could affect the quality of guest stays, and certain rooms and villas directly on South Santa Monica Boulevard could not possibly be rented out during the Proposed Work.
Nevertheless, in an effort to be as neighborly as possible, the Peninsula has been engaging in good faith discussions with Cain over a period of several months, hired dry utility Manatt, Phelps & Phillips, LLP 2049 Century Park East, Suite 1700, Los Angeles, California 90067 Tel: 310.312.4000 Fax: 310.312.4224 manatt
August 14, 2026
Victor De la Cruz
Manatt, Phelps & Phillips, LLP
Direct Dial: (310) 312-4305
[email protected]
Mayor Corman and Councilmembers
City of Beverly Hills
455 N. Rexford Drive
Beverly Hills, CA 90210
Re: Appeal of Permit PW2600515 for Off-Site Electrical Infrastructure - One Beverly Hills Project
Dear Honorable Mayor Corman and City Council:
This firm represents The Belvedere Hotel Partnership dba The Peninsula Beverly Hills (the "Peninsula). Pursuant to Beverly Hills Municipal Code ("BHMC") Sections 8-2-19 and 1- 4-101, on behalf of the Peninsula, we are appealing Permit PW2600515 (Exhibit A), which was issued to the developer of the One Beverly Hills project, Cain International ("Cain"), on Friday, August 7, 2026. The Permit authorizes trenching and installation of off-site electrical infrastructure within the South Santa Monica Boulevard public right-of-way for the One Beverly Hills project (the "Proposed Work") directly in front of the Peninsula. In compliance with BHMC Section 1-4-101 (C), on August 11, 2026, this firm notified the City Engineer and City Manager in the presence of the City Attorney that it would be filing the subject appeal. The City Attorney confirmed that such oral notification satisfied the condition precedent in BHMC Section 1-4-101 (C) for filing this appeal.
The Peninsula has made it eminently clear to the City and Cain on various occasions that the significant period of time that South Santa Monica Boulevard would be subject to lane closures and construction for the Proposed Work would create unacceptable operational and scheduling problems, including violations of existing commitments to guests and hotel partners.
The significant and untenable noise, vibration, and traffic impacts on the Peninsula's guests would further create immense reputational damage and financial harm to the Peninsula. With the Peninsula's Verandah Room being directly on South Santa Monica Boulevard, for example, scheduled weddings, conferences, and events would likely be cancelled, and in tum, this would result in significant room blocks (often forty-plus rooms) being cancelled too. Further, partners such as American Express and Chase Visa require significant advance notice of any renovations or disruptions that could affect the quality of guest stays, and certain rooms and villas directly on South Santa Monica Boulevard could not possibly be rented out during the Proposed Work.
Nevertheless, in an effort to be as neighborly as possible, the Peninsula has been engaging in good faith discussions with Cain over a period of several months, hired dry utility Manatt, Phelps & Phillips, LLP 2049 Century Park East, Suite 1700, Los Angeles, California 90067 Tel: 310.312.4000 Fax: 310.312.4224 manatt
Honorable Mayor Corman and City Council
August 14, 2026
experts to evaluate the feasibility of relocating the Proposed Work to North Santa Monica Boulevard, and offered to pay Cain the difference in costs resulting from any relocation. For those reasons, the Peninsula was shocked by the issuance of the Permit given that as recently as June 9. 2026, Cain informed the Peninsula that relocating the Proposed Work from South Santa Monica Boulevard to North Santa Monica Boulevard should be viable. So incredibly important to the Peninsula is the relocation ofthe Proposed Work to North Santa Monica Boulevard thatthe Peninsula even committed in writing to paying the incremental costs for that relocation work to the tune of approximately $750,000 even though the Proposed Work in no way benefits the Peninsula. (Exhibit B.) In other words, despite the Peninsula’s willingness to pay for theProposed Work to be relocated and such relocation being feasible, a decision was made to reject the PeninsuL&s pleas for help, ignore its significant offer of financial assistance, and keep the Peninsula in the dark until after the new Permit was issued.
We have been informed by the City Manager that South Santa Monica Boulevard was selected over the Peninsula’s objections because it is more convenient to existing Southern California Edison infrastructure, would better serve future needs in the area, and would betteralign with future planned street paving schedules. However, the Peninsula and its dry utility expert team has not seen anything that would support those assertions or that would demonstrate the degree to which moving the Proposed Work just a few feet north would compromise such future needs. And importantly, no effort was made to engage with the Peninsula in a discussion about these issues to explore solutions or better assess whether they overrode the Proposed Work’s potentially catastrophic impacts on the Peninsula. The Peninsula understands that the City must consider overall infrastructure needs in making decisions about utilities; however, it is a mistake to completely ignore major City stakeholders and their long-term tax revenuegeneration for any perceived short-term gain.
As we have previously informed the City, Condition No. 8, adopted as part ofthe City Council’s approval ofthe Amended and Restated 9900 Wilshire Specific Plan (Resolution No. l6-R-13 118, Exhibit C), requires the Applicant to underground utilities in “adjacent streets and alleys.” By its terms, the condition is limited to streets directly adjoining the project site and does not authorize utility work beyond that geographic scope.’ The Permit cannot be issuedwithout first amending the OBH project’s entitlements. Furthermore, having reviewed the recently issued Addendum #4 to the Final Supplemental Environmental Impact Report for the ‘South Santa Monica Boulevard is not adjacent to the One Beverly Hills project site. The site is bounded by Wilshire Boulevard and Santa Monica Boulevard and is bisected by Merv Griffin Way, which together constitute the streets directly adjoining the site and forming the basis ofthe project’s circulation and infrastructure analysis in the SEIR. South Santa Monica Boulevard is physically separated from theproject site and is not identified as a project frontage or adjacent Street in the project approvals or environmental review.
Manatt, Phelps & Phillips, LLP 2049 Century Park East, Suite 1700, Los Angeles, California 90067 Tel: 310.3124000 Fax: 310.312.4224 manatt
Honorable Mayor Corman and City Council
August 14, 2026
experts to evaluate the feasibility of relocating the Proposed Work to North Santa Monica Boulevard, and offered to pay Cain the difference in costs resulting from any relocation. For those reasons, the Peninsula was shocked by the issuance of the Permit given that as recently as June 9, 2026, Cain informed the Peninsula that relocating the Proposed Work from South Santa Monica Boulevard to North Santa Monica Boulevard should be viable. So incredibly important to the Peninsula is the relocation of the Proposed Work to North Santa Monica Boulevard that the Peninsula even committed in writing to paying the incremental costs for that relocation work to the tune of approximately $750,000 even though the Proposed Work in no way benefits the Peninsula. (Exhibit B.) In other words, despite the Peninsula's willingness to pay for the Proposed Work to be relocated and such relocation being feasible, a decision was made to reject the Peninsula's pleas for help, ignore its significant offer of financial assistance, and keep the Peninsula in the dark until after the new Permit was issued.
We have been informed by the City Manager that South Santa Monica Boulevard was selected over the Peninsula's objections because it is more convenient to existing Southern California Edison infrastructure, would better serve future needs in the area, and would better align with future planned street paving schedules. However, the Peninsula and its dry utility expert team has not seen anything that would support those assertions or that would demonstrate the degree to which moving the Proposed Workjust a few feet north would compromise such future needs. And importantly, no effort was made to engage with the Peninsula in a discussion about these issues to explore solutions or better assess whether they overrode the Proposed Work's potentially catastrophic impacts on the Peninsula. The Peninsula understands that the City must consider overall infrastructure needs in making decisions about utilities; however, it is a mistake to completely ignore major City stakeholders and their long-term tax revenue generation for any perceived short-term gain.
As we have previously informed the City, Condition No. 8, adopted as part of the City Council's approval of the Amended and Restated 9900 Wilshire Specific Plan (Resolution No. l 6-R-13118, Exhibit C), requires the Applicant to underground utilities in "adjacent streets and alleys." By its terms, the condition is limited to streets directly adjoining the project site and does not authorize utility work beyond that geographic scope.1 The Permit cannot be issued without first amending the OBH project's entitlements. Furthermore, having reviewed the recently issued Addendum #4 to the Final Supplemental Environmental Impact Report for the 1 South Santa Monica Boulevard is not adjacent to the One Beverly Hills project site. The site is bounded by Wilshire Boulevard and Santa Monica Boulevard and is bisected by Merv Griffin Way, which together constitute the streets directly adjoining the site and forming the basis of the project's circulation and infrastructure analysis in the SEIR. South Santa Monica Boulevard is physically separated from the project site and is not identified as a project frontage or adjacent street in the project approvals or environmental review.
Manatt, Phelps & Phillips, LLP 2049 Century Park East, Suite 1700, Los Angeles, California 90067 Tel: 310.312.4000 Fax: 310.312.4224 manatt
Honorable Mayor Corman and City Council
August 14, 2026
One Beverly Hills Overlay Specific Plan Project (the “SEIR”), it is abundantly clear that thedocument is riddled with flaws that render it meaningless as an informational document under the California Environmental Quality Act (“CEQA”), not the least of which is that the noise and vibration analysis, among others, conceal the Proposed Work’s true impacts. Simply stated, a new Supplemental EIR and public circulation is required to comply with CEQA.
Despite the aforementioned legal violations, the Peninsula remains willing to continue engaging with Cain to explore a potential amicable resolution outside ofthe City Council appeal process. Accordingly, while such discussions continue, at this time we are limiting the contentsofthis appeal as an indication of our good faith in these discussions. However, the Peninsula reserves the right to supplement its appeal before any City Council hearing on the appeal and reserves all rights and remedies, waiving none.
Very truly yours,
Victor De Ia Cruz
Manatt, Phelps & Phillips, LLP
Manatt, Phelps & Phillips, LLP 2049 Century Park East, Suite 1700, Los Angeles, California 90067 Tel: 310.312.4000 Fax: 310.312.4224 manatt
Honorable Mayor Corman and City Council
August 14, 2026
document is riddled with flaws that render it meaningless as an informational document under the California Environmental Quality Act ("CEQA"), not the least of which is that the noise and vibration analysis, among others, conceal the Proposed Work's true impacts. Simply stated, a new Supplemental EIR and public circulation is required to comply with CEQA.
Despite the aforementioned legal violations, the Peninsula remains willing to continue engaging with Cain to explore a potential amicable resolution outside of the City Council appeal process. Accordingly, while such discussions continue, at this time we are limiting the contents of this appeal as an indication of our good faith in these discussions. However, the Peninsula reserves the right to supplement its appeal before any City Council hearing on the appeal and reserves all rights and remedies, waiving none.
Very truly yours,
Victor De la Cruz
Manatt, Phelps & Phillips, LLP
Manatt, Phelps & Phillips, LLP 2049 Century Park East, Suite 1700, Los Angeles, California 90067 Tel: 310.312.4000 Fax: 310.312.4224 EExhibit x
h
i
b
it A A
TM
CITY OF BEVERLY HILLS
DEPARTMENT OF PUBLIC WORKS
455 North Rexford Drive
Beverly Hills, California 90210
Permit No: PW2600515
Status: Issued
08112/2026
Excavation (PW)
Job Address:
Project Number: 413079
9900 SANTA MONICA BLVD
Project Description: OBH SCE EXECUTIVE CIRCUIT
Start Date:
Applied: 07/30/2026
Issued: 08/07/2026
End Date: 10/09/2026
Job Description: MP - OBH: EXCAVATION FOR SCE EXECUTIVE WORK. EXTEND SCE LINES
ALONG SOUTH SANTA MONICA BLVD FROM WILSHIRE BLVD TO
CHARLEVILLE BLVD.
Permit Details
Work Location:
Hours:
Parking Meter No:
USA Ticket No:
PEOPLE
Type Name
Applicant Ella Tichy
Applicant BERNADETTE AGCAOILI
Contractor NICK ANDREJICH
Address
1840 CENTURY PARK EAST
1840 Century Park East, Suite 1400
9852 E JOE VARGAS WAY
Phone License
(510) 501-1246
(626) 434-7649 524540
ID Date Method Amount
896929 08/03/2026 2:48:07 PM CHECK
Paid By
BH LUXURY RESIDENCES LLC (finance@cain
dev.com)
897255 08/07/2026 2:27:27 PM CHECK $7,038.00 BH LUXURY RESIDENCES LLC (finance@cain dev.com)
897256 08/07/2026 2:28:47 PM CHECK $3,273.30 BH LUXURY RESIDENCES LLC (finance@cain dev.com)
FINANCE
Group Activity Review Paid Balance
Public Right-of-Way (PW) $10,311.30 $95.00 $10,406.30 $0.00 TOTAL $10,311.30 $95.00 $10,406.30 $0.00
TRANSACTIONS
$95.00
CITY OF BEVERLY HILLS
DEPARTMENT OF PUBLIC WORKS
455 North Rexford Drive
Beverly Hills, California 90210
■
ii
;a
...
·
.
Permit No: PW2600515
Status: Issued 08/12/2026
Job Address:
Project Number: Project Description:
Start Date:
Excavation (PW)
9900 SANTA MONICA BLVD
413079
OBH SCE EXECUTIVE CIRCUIT
Applied:
Issued:
End Date:
07/30/2026
08/07/2026
10/09/2026
Job Description: MP - OBH: EXCAVATION FOR SCE EXECUTIVE WORK. EXTEND SCE LINES
ALONG SOUTH SANTA MONICA BLVD FROM WILSHIRE BLVD TO
CHARLEVILLE BLVD.
Permit Details
Work Location:
Hours:
Parking Meter No:
USA Ticket No:
PEOPLE
Type Name
Applicant Ella Tichy
Applicant BERNADETTE AGCAOILI
Contractor NICK ANDREJICH
FINANCE
Address
1840 CENTURY PARK EAST 1840 Century Park East, Suite 1400 9852 E JOE VARGAS WAY
Phone License
(510) 501-1246
(626) 434-7649 524540
Group
Public Right-of-Way (PW)
TOTAL
TRANSACTIONS
Activity
$10,311.30 $10,311.30
Review
$95.00
$95.00
Paid
$10,406.30 $10,406.30
Balance
$0.00
$0.00
ID Date Method Amount Paid By 896929 08/03/2026 2:48:07 PM CHECK $95.00 BH LUXURY RESIDENCES LLC (finance@caindev.com) 897255 08/07/2026 2:27:27 PM CHECK $7,038.00 BH LUXURY RESIDENCES LLC (finance@caindev.com) 897256 08/07/2026 2:28:47 PM CHECK $3,273.30 BH LUXURY RESIDENCES LLC (finance@caindev.com)
PERMIT CONDITIONS
BHMC 7-2-205: COMMERCIAL VEHICLES PROHIBITED FROM USING PRIVATE DRIVEWAYS WITHOUT PERMISSION:
BHMC 7-2-205: COMMERCIAL VEHICLES PROHIBITED FROM USING PRIVATE DRIVEWAYS WITHOUTPERMISSION: No person shall operate or drive a commercial vehicle in, on, or across any private driveway approach or sidewalk area without the consent of the owner or occupant of such property if a sign or markings are in place indicating that the use of such driveway is prohibited. For the purposes of this section, a commercial vehicle shall mean a vehicle having a rated capacity in excess of one-half (1/2) ton. (1962 Code 0 3-6.803)
CLASS ‘B’ EXCAVATION PERMIT
CLASS ‘B’ EXCAVATION PERMIT Must maintain traffic at all times. Backfill all open excavations or plate with steel traffic plates overnight. Plates shall be recessed in accordance with Standard Drawing BH 113. Must call for inspection prior to backfilling. Backfill and surface restoration shall be in accordance with Standard Drawing BH 114. Two (1) sack sand slurry backfill is required. Must maintain access to adjacent properties. Must maintain sanitation pickup. Must maintain a clear and safe walkway for pedestrian traffic at all times. No sidewalk closure and no diversion of pedestrian traffic without an approved alternate accommodation. Walkway may be temporarily obstructed under the control of flaggers. Provide adequate cones, delineators, barricades and signs to protect the work site as appropriate. No equipment, materials or debris may remain on the Public Right-of-way overnight unless indicated on the permit as a Special Condition. *THE PUBLIC WORKS AND
TRANSPORTATION DEPARTMENT RESERVES THE RIGHT TO REQUIRE TEST/OBSERVATION WELLS BE ABANDONDED AND SEALED IF CONDITIONS WARRANT IT. AFTER THE APPLICANT RECEIVES
NOTIFICATION OF ABANDONMENT, THE APPLICANT MUST IMMEDIATELY MAKE ARRANGEMENTS TO
REMOVE THE EXISTING CONDITION AND RESTORE THE AREA ACCORDING TO THE PUBLIC WORKS AND TRANSPORTATION DEPARTMENT’S SPECIFICATION. FAILURE TO ABANDON WELLS WITHIN THE
TIME LIMITS SPECIFIED, WILL FORCE THE CITY TO TAKE APPROPRIATE ACTION AS DEEMED NECESSARY, AND BILL THE APPLICANT FOR ALL COSTS ASSOCIATED WITH THAT ACTION. *THE
MAIN SHALL NOT BE TAPPED WITHOUT THE SPECIFIC APPROVAL OF THE DIRECTOR OF PUBLIC WORKS AND TRANSPORTATION. IF APPROVED, THE TAP MUST BE PERFORMED BY A LICENSED SEWER CONTRACTOR (C-42) IN THE PRESENCE OF AN INSPECTOR ACTING UNDER THE AUTHORITY OF THE DIRECTOR. ANY CONTRACTOR INSTALLING A NEW WYE OR SADDLE INTO A
CITY SEWER MAIN IS REQUIRED TO REPORT ITS LOCATION (DISTANCE TO NEAREST MANHOLE) TO THE CIVIL ENGINEERING DIVISION OF THE PUBLIC WORKS AND TRANPORTATION DEPARTMENT. ****ONLY VITREOUS CLAY PIPE WILL BE ACCEPTED FOR INSPECTION WITHIN THE PUBLIC RIGHT OF-WAY. *ALL REQUIRED INSURANCE CERTIFICATES MUST BE PROVIDED PRIOR TO ISSUANCE OF A PERMIT. *DEPENDING ON THE SCOPE OF WORK, ADDITIONAL PERMITS/APPROVALS MAY BE REQUIRED. *SPECIAL CONDITIONS/INSTRUCTIONS ON THE PERMIT SHALL TAKE PRECEDENCE OVER GENERAL CONDITIONS. -
HEAVY HAUL ROUTES - BHMC 7-2-202: EMERGENCY OR NECESSARY USE OF RESTRICTED STREETS:
HEAVY HAUL ROUTES -BHMC 7-2-202: EMERGENCY OR NECESSARY USE OF RESTRICTED STREETS: The following vehicles may use a street other than designated in section 7-2-203 of this articleunder the circumstances herein below: A. Any passenger vehicle while operated, engaged, and used for the sole and exclusive purpose of picking up or discharging a passenger or passengers at an origin or destination on any street in which the vehicle is prohibited; B. Any vehicle when necessary, for the purpose of making pick ups and deliveries of goods, wares, or merchandise from or to any premises located on any prohibited street, or for the purpose of delivering materials on a prohibited street to be used in the repair, alteration, remodeling, or construction of any building or structure for which a building permit has previously been obtained; C.Whenever it is necessary for a vehicle to deviate from the streets designated in section 7-2-203 of this article for the purposes specified in subsection A or B of this section, the vehicle shall travel from a street authorized by section 7-2-203 of this article to the destination by a route so that the point of travel is the shortest possible distance over prohibited streets; provided however, if the additional distance of travel to reach the shortest route would exceed two (2) miles, the vehicle may take the most direct route to its destination. (1962 Code 00 3-6.1306, 3-6.1306.1)
HEAVY VEHICLE RESTRICTIONS - BHMC 7-2-201: HEAVY VEHICLES RESTRICTED TO CERTAIN STREETS:
HEAVY VEHICLE RESTRICTIONS -BHMC 7-2-201: HEAVY VEHICLES RESTRICTED TO CERTAIN
PERMIT CONDITIONS
BHMC 7-2-205: COMMERCIAL VEHICLES PROHIBITED FROM USING PRIVATE DRIVEWAYS WITHOUT PERMISSION:
BHMC 7-2-205: COMMERCIAL VEHICLES PROHIBITED FROM USING PRIVATE DRIVEWAYS WITHOUT PERMISSION: No person shall operate or drive a commercial vehicle in, on, or across any private driveway approach or sidewalk area without the consent of the owner or occupant of such property if a sign or markings are in place indicating that the use of such driveway is prohibited. For the purposes of this section, a commercial vehicle shall mean a vehicle having a rated capacity in excess of one-half (1/2) ton. (1962 Code 0 3-6.803)
CLASS 'B' EXCAVATION PERMIT
CLASS 'B' EXCAVATION PERMIT Must maintain traffic at all times. Backfill all open excavations or plate with steel traffic plates overnight. Plates shall be recessed in accordance with Standard Drawing BH 113. Must call for inspection prior to backfilling. Backfill and surface restoration shall be in accordance with Standard Drawing BH 114. Two (1) sack sand slurry backfill is required. Must maintain access to adjacent properties. Must maintain sanitation pickup. Must maintain a clear and safe walkway for pedestrian traffic at all times. No sidewalk closure and no diversion of pedestrian traffic without an approved alternate accommodation. Walkway may be temporarily obstructed under the control of flaggers. Provide adequate cones, delineators, barricades and signs to protect the work site as appropriate. No equipment, materials or debris may remain on the Public Right-of-way overnight unless indicated on the permit as a Special Condition. THE PUBLIC WORKS AND
TRANSPORTATION DEPARTMENT RESERVES THE RIGHT TO REQUIRE TEST/OBSERVATION WELLS BE ABANDONDED AND SEALED IF CONDITIONS WARRANT IT. AFTER THE APPLICANT RECEIVES
NOTIFICATION OF ABANDONMENT, THE APPLICANT MUST IMMEDIATELY MAKE ARRANGEMENTS TO
REMOVE THE EXISTING CONDITION AND RESTORE THE AREA ACCORDING TO THE PUBLIC WORKS AND TRANSPORTATION DEPARTMENT'S SPECIFICATION. FAILURE TO ABANDON WELLS WITHIN THE
TIME LIMITS SPECIFIED, WILL FORCE THE CITY TO TAKE APPROPRIATE ACTION AS DEEMED NECESSARY, AND BILL THE APPLICANT FOR ALL COSTS ASSOCIATED WITH THAT ACTION. THE MAIN SHALL NOT BE TAPPED WITHOUT THE SPECIFIC APPROVAL OF THE DIRECTOR OF PUBLIC WORKS AND TRANSPORTATION. IF APPROVED, THE TAP MUST BE PERFORMED BY A LICENSED SEWER CONTRACTOR (C-42) IN THE PRESENCE OF AN INSPECTOR ACTING UNDER THE AUTHORITY OF THE DIRECTOR. ANY CONTRACTOR INSTALLING A NEW WYE OR SADDLE INTO A
CITY SEWER MAIN IS REQUIRED TO REPORT ITS LOCATION (DISTANCE TO NEAREST MANHOLE) TO THE CIVIL ENGINEERING DIVISION OF THE PUBLIC WORKS AND TRANPORTATION DEPARTMENT. ****ONLY VITREOUS CLAY PIPE WILL BE ACCEPTED FOR INSPECTION WITHIN THE PUBLIC RIGHTOF-WAY. *ALL REQUIRED INSURANCE CERTIFICATES MUST BE PROVIDED PRIOR TO ISSUANCE OF A PERMIT. DEPENDING ON THE SCOPE OF WORK, ADDITIONAL PERMITS/APPROVALS MAY BE REQUIRED. 'SPECIAL CONDITIONS/INSTRUCTIONS ON THE PERMIT SHALL TAKE PRECEDENCE OVER GENERAL CONDITIONS. HEAVY HAUL ROUTES - BHMC 7-2-202: EMERGENCY OR NECESSARY USE OF RESTRICTED STREETS:
HEAVY HAUL ROUTES - BHMC 7-2-202: EMERGENCY OR NECESSARY USE OF RESTRICTED STREETS: The following vehicles may use a street other than designated in section 7-2-203 of this article under the circumstances herein below: A. Any passenger vehicle while operated, engaged, and used for the sole and exclusive purpose of picking up or discharging a passenger or passengers at an origin or destination on any street in which the vehicle is prohibited; B. Any vehicle when necessary, for the purpose of making pick ups and deliveries of goods, wares, or merchandise from or to any premises located on any prohibited street, or for the purpose of delivering materials on a prohibited street to be used in the repair, alteration, remodeling, or construction of any building or structure for which a building permit has previously been obtained; C.
Whenever it is necessary for a vehicle to deviate from the streets designated in section 7-2-203 of this article for the purposes specified in subsection A or B of this section, the vehicle shall travel from a street authorized by section 7-2-203 of this article to the destination by a route so that the point of travel is the shortest possible distance over prohibited streets; provided however, if the additional distance of travel to reach the shortest route would exceed two (2) miles, the vehicle may take the most direct route to its destination. (1962 Code 00 3-6.1306, 3-6.1306.1)
HEAVY VEHICLE RESTRICTIONS - BHMC 7-2-201: HEAVY VEHICLES RESTRICTED TO CERTAIN STREETS:
HEAVY VEHICLE RESTRICTIONS - BHMC 7-2-201: HEAVY VEHICLES RESTRICTED TO CERTAIN
STREETS: A. No person shall operate any vehicle having a gross weight, including the vehicle and its load, of three (3) tons or more on any street in the city except on those streets designated in section 7-2-203 of the Beverly Hills Municipal Code. IT IS THE RESPONSIBILITY OF THE PERMITTEE TO DISTRIBUTE A COPY OF THIS PERMIT TO ALL OPERATORS OF HEAVY VEHICLES PURSUANT TO THIS CODE. B. The provisions of subsection A of this section shall not apply to the following: 1. Any passenger stage vehicleregulated by sections 1031 through 1036 of the state Public Utilities Code and operating under a certificate from the public utilities commission of the state declaring that the public necessity and convenience require the operation of such vehicle; and further provided that the certificate specifically authorizes such vehicle to be operated in the city, and the vehicle is being operated while in the city for the purpose authorized in such certificate; provided further, this exemption shall not apply to vehicles operated as a round trip sightseeing service; 2. Any vehicle owned by a public utility while necessarily in use in the construction, installation, or repair of any public utility; 3. Any vehicle operated by the city, or any employee thereof, in the course of regular or official city business; 4. Any vehicle of the military or naval forces of the United States or the duly authorized militia of the state in the proper performance of their duties. (1962 Code o36 1306 amd. Ord. 90-0-2088, eff. 2-8-1990)
OVERSIZE HAULING:
OVERSIZE HAULING: Hauling that meets the following criteria may require engineering investigations, routing definition, coordination, police escort, and control of permit movement: (1) Loads in excess of 14 feet wide. (2) Loads in excess of 135 feet in overall length. (3) Loads that are of a weight that require: A) More than a 13- axle, single-vehicle width hauling combination, or B) A 13-axle, single-vehicle width hauling combination with a load deck where the inner axles in the groups bordering the load deck are 40 feet or more apart, or C) Two ormore side-by-side vehicles with a combined width of 14 feet or more supporting the load.
STREETS DESIGNATED FOR HEAVY VEHICLE USAGE:
STREETS DESIGNATED FOR HEAVY VEHICLE USAGE: Pursuant to Beverly Hills Municipal Code 0 7-2-203, the following streets are designated for use by vehicles exceeding a maximum gross weight, including the vehicle and its load, of three (3) tons: Alden Drive; Bedford Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Beverly Boulevard; Beverly Drive from the south city limits to Santa Monica Boulevard (north); Brighton Way from Canon Drive to Wilshire Boulevard; Burton Way; Camden Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Canon Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Civic Center Drive from Burton Way to Santa Monica Boulevard (south); Crescent Drive between the north and south roadways of Santa Monica Boulevard; Dayton Way from Canon Drive to Wilshire Boulevard; Doheny Drive; Foothill Road from Burton Way to Santa Monica Boulevard (south); La CienegaBoulevard; Linden Drive from Wilshire Boulevard to Santa MonicaBoulevard (south); Maple Drive from Burton Way to Santa Monica Boulevard (south); Olympic Boulevard; Rexford Drive from Santa Monica Boulevard (north) to Burton Way; Robertson Boulevard; Rodeo Drive from Wilshire Boulevard to Santa Monica Boulevard(north); Roxbury Drive from Wilshire Boulevard to Santa Monica Boulevard (north); San Vicente Boulevard; Santa Monica Boulevard (north and south roadways); Third Street; Wilshire Boulevard ***FOR OPERATORS
USING LOMA VISTA DRIVE AS THE SHORTEST PATH FROM AN APPROVED HEAVY HAUL ROUTE TO
THE CONSTRUCTION SITE, PLEASE NOTE THAT THERE IS A TRUCK RUN OFF RAMP AT LOMA VISTA DRIVE LOCATED NORTH OF DOHENY ROAD.
POST “NO STOPPING” SIGNS
POST “NO PARKING’ SIGNS PERMIT APPLICANTS MUST POST SIGNS AT LEAST 72 HOURS PRIOR TO WORK ACTIVITY. ANY LESS THAN 72 HOURS, THE SIGNS ARE NOT ENFORCEBABLE. Please notify Police Dispatch when signs have been posted at (310)550-4875. The posting of “NO PARKING” signs is expressly intended to allow access to the curb lane for the loading/unloading of construction related materials and equipment where otherwise impractical. Signs shall not be issued for purposes of construction parking.
Vehicles not actively engaged in the activity specifically indicated on the accompanying permit will be subjectto enforcement as posted. Use of nails, tacks, staples or other intrusive method of attachment to City trees shall immediately void the permit. NO PARKING SIGNS Must be removed at the conclusion of the activity or upon expiration, whichever occurs first. Otherwise a permit violation fee will be applied. Sign information shall be complete and legible from the first traffic lane. Signs may not be altered or reused. *VIOLATION OF ANY CONDITION IMMEDIATELY VOIDS THIS PERMIT. *SPECIAL CONDITIONS/INSTRUCTIONS ON THE PERMIT SHALL TAKE PRECEDENCE OVER GENERAL CONDITIONS. *AMENDMENT FEE WILL BE
ADDED TO ANY CHANGES TO THIS PER
TROUSDALE HAULING MEASURES
STREETS: A. No person shall operate any vehicle having a gross weight, including the vehicle and its load, of three (3) tons or more on any street in the city except on those streets designated in section 7-2-203 of the Beverly Hills Municipal Code. IT IS THE RESPONSIBILITY OF THE PERMITTEE TO DISTRIBUTE A COPY OF THIS PERMIT TO ALL OPERATORS OF HEAVY VEHICLES PURSUANT TO THIS CODE. B. The provisions of subsection A of this section shall not apply to the following: 1. Any passenger stage vehicle regulated by sections 1031 through 1036 of the state Public Utilities Code and operating under a certificate from the public utilities commission of the state declaring that the public necessity and convenience require the operation of such vehicle; and further provided that the certificate specifically authorizes such vehicle to be operated in the city, and the vehicle is being operated while in the city for the purpose authorized in such certificate; provided further, this exemption shall not apply to vehicles operated as a round trip sightseeing service; 2. Any vehicle owned by a public utility while necessarily in use in the construction, installation, or repair of any public utility; 3. Any vehicle operated by the city, or any employee thereof, in the course of regular or official city business; 4. Any vehicle of the military or naval forces of the United States or the duly authorized militia of the state in the proper performance of their duties. (1962 Code O 3-6.1306; amd. Ord. 90-0-2088, eff. 2-8-1990)
OVERSIZE HAULING:
OVERSIZE HAULING: Hauling that meets the following criteria may require engineering investigations, routing definition, coordination, police escort, and control of permit movement: (1) Loads in excess of 14 feet wide. (2) Loads in excess of 135 feet in overall length. (3) Loads that are of a weight that require: A) More than a 13- axle, single-vehicle width hauling combination, or B) A 13-axle, single-vehicle width hauling combination with a load deck where the inner axles in the groups bordering the load deck are 40 feet or more apart, or C) Two or more side-by-side vehicles with a combined width of 14 feet or more supporting the load. STREETS DESIGNATED FOR HEAVY VEHICLE USAGE:
STREETS DESIGNATED FOR HEAVY VEHICLE USAGE: Pursuant to Beverly Hills Municipal Code O 7-2-203, the following streets are designated for use by vehicles exceeding a maximum gross weight, including the vehicle and its load, of three (3) tons: Alden Drive; Bedford Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Beverly Boulevard; Beverly Drive from the south city limits to Santa Monica Boulevard (north); Brighton Way from Canon Drive to Wilshire Boulevard; Burton Way; Camden Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Canon Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Civic Center Drive from Burton Way to Santa Monica Boulevard (south); Crescent Drive between the north and south roadways of Santa Monica Boulevard; Dayton Way from Canon Drive to Wilshire Boulevard; Doheny Drive; Foothill Road from Burton Way to Santa Monica Boulevard (south); La Cienega Boulevard; Linden Drive from Wilshire Boulevard to Santa MonicaBoulevard (south); Maple Drive from Burton Way to Santa Monica Boulevard (south); Olympic Boulevard; Rexford Drive from Santa Monica Boulevard (north) to Burton Way; Robertson Boulevard; Rodeo Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Roxbury Drive from Wilshire Boulevard to Santa Monica Boulevard (north); San Vicente Boulevard; Santa Monica Boulevard (north and south roadways); Third Street; Wilshire Boulevard FOR OPERATORS
USING LOMA VISTA DRIVE AS THE SHORTEST PATH FROM AN APPROVED HEAVY HAUL ROUTE TO
THE CONSTRUCTION SITE, PLEASE NOTE THAT THERE IS A TRUCK RUN OFF RAMP AT LOMA VISTA DRIVE LOCATED NORTH OF DOHENY ROAD.
POST "NO STOPPING" SIGNS
POST "NO PARKING" SIGNS PERMIT APPLICANTS MUST POST SIGNS AT LEAST 72 HOURS PRIOR TO WORK ACTIVITY. ANY LESS THAN 72 HOURS, THE SIGNS ARE NOT ENFORCEBABLE. Please notify Police Dispatch when signs have been posted at (310)550-4875. The posting of "NO PARKING" signs is expressly intended to allow access to the curb lane for the loading/unloading of construction related materials and equipment where otherwise impractical. Signs shall not be issued for purposes of construction parking.
Vehicles not actively engaged in the activity specifically indicated on the accompanying permit will be subject to enforcement as posted. Use of nails, tacks, staples or other intrusive method of attachment to City trees shall immediately void the permit. NO PARKING SIGNS Must be removed at the conclusion of the activity or upon expiration, whichever occurs first. Otherwise a permit violation fee will be applied. Sign information shall be complete and legible from the first traffic lane. Signs may not be altered or reused. VIOLATION OF ANY CONDITION IMMEDIATELY VOIDS THIS PERMIT. *SPECIAL CONDITIONS/INSTRUCTIONS ON THE PERMIT SHALL TAKE PRECEDENCE OVER GENERAL CONDITIONS. AMENDMENT FEE WILL BE
ADDED TO ANY CHANGES TO THIS PER
TROUSDALE HAULING MEASURES
***Special Conditions Regarding the Trousdale Estates Area Transportation Measures*** *prior to the issuance of a building permit the prime contractor must complete ‘Construction Transportation Management Plan’ and ‘Contractor Acknowledgement’ forms (Attachment B and C of the Transportation Measures Document). *No vehicles with loads weighing in excess of 50,400 lbs will be allowed to enter the Trousdale Estates area, regardless of vehicle inspection/certification. Total vehicle + cargo load must be under 50,400 lbs. *Any vehicle over 10,000 lbs Gross Vehicle Weight (GVW) and three or more axles must also contain a secondary braking system that is deemed adequate by the City’->s vehicle inspection agent. *Construction vehicles in excess of 10,000 lbs are only allowed to be in the Trousdale area between the hours of 8:30 am and 3:15 pm on weekdays. *Any vehicle over 10,000 Ibs, and less than 50,400 Ibs, must provide annual inspection reports tothe City of Beverly Hills for certification to be allowed entry into the Trousdale estates area. *staging of multiple trucks at one site is not allowed within Beverly Hills city limits. Trucks will need to enter and exit the area using the designated hauling routes for Zone I or 2, one truck at a time. is also required that all vehicles adhere to the regulations set forth by the Trousdale Construction Transportation-Related Measures found here:www.beverlyhills.org/trousdale.
ADDITIONAL TROUSDALE MEASURES
For approval of hauling in Trousdale, the general contractor must send an email with the following information to trousdale©beverlyhills.org: ‘Associated Site address and Permit #‘ Expected date and time of arrival’ Vehicle License Plate #‘ Company name and Type of vehicle ‘Zone 1 or Zone 2 Hauling Route’ Parking location for vehicle while in Trousdale (public ROW/private property) The contractor must receive a reply email from the City, acknowledging receipt and approval for hauling in the Trousdale area, prior to the truck arriving in the Trousdale Estates. *No vehicles with loads weighing in excess of 50,400 lbs will be allowed to enter the Trousdale area, regardless of vehicle inspection/certification. Total vehicle + cargo load must be under 50,400 lbs. *Construction vehicles in excess of 10,000 lbs are only allowed to be in the Trousdale area between the hours of 8:30 am and 3:15 pm on weekdays.
Restrictions On Construction Activity
No person shall engage in construction, maintenance or repair work which requires a City permit between the hours of 6:00 p.m. and 8:00 a.m. of any day, or at any time on a Sunday or public holiday unless such person has been issued an after hours construction permit. In addition, no person shall engage in such work within a residential zone, or within five hundred (500) feet of a residential zone, at any time on a Saturday unless suchperson has been issued an after hours construction permit. For the purpose of this Section, “Public Holiday” shall mean:
1. New Year’s Day
2. Martin Luther King Jr. Day
3. Presidents Day
4. Memorial Day
5. Juneteenth6. Independence Day
7. Labor Day8. Yom Kippur
9. Veterans Day
10. Thanksgiving Day
11. The Friday following Thanksgiving Day
12. Christmas Day
No person employed for the purposes of construction, maintenance, or repair work which requires a city permit shall enter a site on which such work will be done prior to 8:00 am. Any violation of this condition shall be deemed to be an infraction.
Public Right of Way Use Conditions of Approval
Typical Conditions for ROW Permits
1. Applicant must schedule pre-construction meeting using our CitySmart system by visiting https://cs.beverlyhills.org/csportal/ ( at least five (5) business days before the start of work for field coordination and specific conditions.
Special Conditions Regarding the Trousdale Estates Area Transportation Measures*** *Prior to the issuance of a building permit the prime contractor must complete 'Construction Transportation Management Plan' and 'Contractor Acknowledgement' forms (Attachment B and C of the Transportation Measures Document). No vehicles with loads weighing in excess of 50,400 lbs will be allowed to enter the Trousdale Estates area, regardless of vehicle inspection/certification. Total vehicle+ cargo load must be under 50,400 lbs. *Any vehicle over 10,000 lbs Gross Vehicle Weight (GVW) and three or more axles must also contain a secondary braking system that is deemed adequate by the City'->s vehicle inspection agent. *Construction vehicles in excess of 10,000 lbs are only allowed to be in the Trousdale area between the hours of 8:30 am and 3: 15 pm on weekdays. Any vehicle over 10,000 lbs, and less than 50,400 lbs, must provide annual inspection reports to the City of Beverly Hills for certification to be allowed entry into the Trousdale estates area. *Staging of multiple trucks at one site is not allowed within Beverly Hills city limits. Trucks will need to enter and exit the area using the designated hauling routes for Zone 1 or 2, one truck at a time. It is also required that all vehicles adhere to the regulations set forth by the Trousdale Construction Transportation-Related Measures found here: www.beverlyhills.org/trousdale. -
ADDITIONAL TROUSDALE MEASURES
For approval of hauling in Trousdale, the general contractor must send an email with the following information to [email protected]: ' Associated Site address and Permit # ' Expected date and time of arrival ' Vehicle License Plate # ' Company name and Type of vehicle ' Zone 1 or Zone 2 Hauling Route ' Parking location for vehicle while in Trousdale (public ROW/private property) The contractor must receive a reply email from the City, acknowledging receipt and approval for hauling in the Trousdale area, prior to the truck arriving in the Trousdale Estates. *No vehicles with loads weighing in excess of 50,400 lbs will be allowed to enter the Trousdale area, regardless of vehicle inspection/certification. Total vehicle + cargo load must be under 50,400 lbs. *Construction vehicles in excess of 10,000 lbs are only allowed to be in the Trousdale area between the hours of 8:30 am and 3: 15 pm on weekdays.
Restrictions On Construction Activity
No person shall engage in construction, maintenance or repair work which requires a City permit between the hours of 6:00 p.m. and 8:00 a.m. of any day, or at any time on a Sunday or public holiday unless such person has been issued an after hours construction permit. In addition, no person shall engage in such work within a residential zone, or within five hundred (500) feet of a residential zone, at any time on a Saturday unless such person has been issued an after hours construction permit. For the purpose of this Section, "Public Holiday" shall mean:
1. New Year's Day
2. Martin Luther King Jr. Day
3. Presidents Day
4. Memorial Day
5. Juneteenth
6. Independence Day
7. Labor Day 8. Yorn Kippur 9. Veterans Day
10. Thanksgiving Day
11. The Friday following Thanksgiving Day 12. Christmas Day No person employed for the purposes of construction, maintenance, or repair work which requires a city permit shall enter a site on which such work will be done prior to 8:00 a.m. Any violation of this condition shall be deemed to be an infraction.
Public Right of Way Use Conditions of Approval
Typical Conditions for ROW Permits
1. Applicant must schedule pre-construction meeting using our CitySmart system by visiting https://cs.beverlyhills.org/csportal/ ( at least five (5) business days before the start of work for field coordination and specific conditions. Page 4 of 5
2. Notify adjacent residents and/or businesses at least three (3) days prior to starting work.
3. If “No Parking Signs” are required, applicants must purchase and post the City approved signs at least seventy-two (72) hours prior to start date. Applicants must contact Police Dispatch (310-550-4875) once signs have been posted to verify. All information must be completed on the signs.
4. Working hours are specified on the permit or Municipal Code hours start at 8AM. No weekend work unless authorized by the permit.
5. Coordinate work with the Sanitation Bureau at least two (2) business days before work starts (310-285- 2465).
6. Traffic control shall be per approved, stamped traffic control plans, the latest CAM UTCD or WATCH Manual. Safe vehicle travel must be maintained at all times.
7. Stamped or approved plans and traffic control plans must be on site.
8. No stockpiling of debris or storage of equipment and/or materials is allowed in the public right-of-way.9. Sidewalks must maintain 4 feet of safe pedestrian access at all times without diversion unless otherwise approved. Pedestrian traffic control shall comply with the latest edition of the WATCH Manual.
10. Restore full street, alley or sidewalk access at the end of each working day. Work area shall be cleaned at the end of each day to the satisfaction of the PW Inspector.
11. After hours work and inspections are subject to overtime inspection fees.
UNDERGROUND SERVICE DIG ALERT
It is required to call Underground Service Alert (DIG ALERT) at 811 at least two working days before excavating. Underground Service Alert will coordinate with utility owners in the area to mark the locations of buried utility-owned lines. You can also request a ticket online through www.call8l 1 .com NOTES
2. Notify adjacent residents and/or businesses at least three (3) days prior to starting work. 3. If "No Parking Signs" are required, applicants must purchase and post the City approved signs at least seventy-two (72) hours prior to start date. Applicants must contact Police Dispatch (310-550-4875) once signs have been posted to verify. All information must be completed on the signs.
4. Working hours are specified on the permit or Municipal Code hours start at 8AM. No weekend work unless authorized by the permit.
5. Coordinate work with the Sanitation Bureau at least two (2) business days before work starts (310-285- 2465).
6. Traffic control shall be per approved, stamped traffic control plans, the latest CAMUTCD or WATCH Manual. Safe vehicle travel must be maintained at all times.
7. Stamped or approved plans and traffic control plans must be on site. 8. No stockpiling of debris or storage of equipment and/or materials is allowed in the public right-of-way. 9. Sidewalks must maintain 4 feet of safe pedestrian access at all times without diversion unless otherwise approved. Pedestrian traffic control shall comply with the latest edition of the WATCH Manual. 10. Restore full street, alley or sidewalk access at the end of each working day. Work area shall be cleaned at the end of each day to the satisfaction of the PW Inspector. 11. After hours work and inspections are subject to overtime inspection fees. UNDERGROUND SERVICE DIG ALERT It is required to call Underground Service Alert (DIG ALERT) at 811 at least two working days before excavating. Underground Service Alert will coordinate with utility owners in the area to mark the locations of buried utility-owned lines. You can also request a ticket online through www.call811.com NOTES
EExhibit x
h
i
b
it B B
From: De Ia Cruz, Victor
To: De a Cruz, Victor
Subject: FW: One Beverly Hills - SCE Conduit
Date: Friday, August 14, 2026 1:43:19 PM
On 10 Jun 2026, at 23:29, Robert Zarnegin
<rzarnegnprobitynternatonaLcom> wrote:
This email originated from outside of the organisation
Dear Jonathan,
Thank you for your update of June 9th and your indication that relocating the SCE electric line is doable.
Subject to verification, Peninsula is willing to pay all direct, valid costs which you would incur to relocate the SCE line to North Santa Monica Boulevard, above and beyond the costs you would have incurred had the project gone forward, as you originally proposed on South Santa Monica Boulevard.
We presume you arrive at the $750,000 cost estimate after conducting an in-depth review of the costs. In your email you stated that you can provide “evidence” supporting such
estimate. We would appreciate receiving at your earliest convenience details of all such evidence for our review, including the details of your cost estimate, as well as detailed evidence of the electric line project costs, as originally proposed on South Santa Monica Boulevard.
We look forward to receiving the above information at your earliest convenience.
My best wishes,Robert
From:
To:
Subject:
Date:
De la Cruz, Victor De la Cruz Victor FW: One Beverly Hills - SCE Conduit Friday, August 14, 2026 1:43:19 PM On 1 O Jun 2026, at 23:29, Robert Zarnegin
<[email protected]> wrote:
wwry4 go ewe s ts ow r "ti"
This email originated from outside of the organisation.
Dear Jonathan,
Thank you for your update of June 9" and your indication that relocating the SCE electric line is doable. Subject to verification, Peninsula is willing to pay all direct, valid costs which you would incur to relocate the SCE line to North Santa Monica Boulevard, above and beyond the costs you would have incurred had the project gone forward, as you originally proposed on South Santa Monica Boulevard. We presume you arrive at the $750,000 cost estimate after conducting an in-depth review of the costs. In your email you stated that you can provide "evidence" supporting such estimate. We would appreciate receiving at your earliest convenience details of all such evidence for our review, including the details of your cost estimate, as well as detailed evidence of the electric line project costs, as originally proposed on South Santa Monica Boulevard.
We look forward to receiving the above information at your earliest convenience.
My best wishes,
Robert
From: Jonathan Goldstein <[email protected]>
Sent: Tuesday, June 9, 2026 11:39 AM
To: Robert Zarnegin <rzarneginprobityinternationaI.com> Cc: Larry Green Cain Dev <larrv.greencain-dev.com>
Subject: One Beverly Hills - SCE Conduit
Dear Robert
I committed to you in our meeting [ate April that, at your request, we would look at relocating the SCE conduit from South Santa Monica Boulevard to North SantaMonica Boulevard and keep you apprised of what we found. In our meeting, and your subsequent email of May 19, you agreed to cover any extra costs to reroute the line.
There are positive signs that the relocation is viable and our current estimate ofthe incremental costs for moving the SCE conduit will be in the range of $750,000. We can of course evidence this to you.
Please reconfirm that ifwe are able to accomplish this relocation, Peninsula agrees to pay the increased costs. We would bill you during the course of the work. Once we have received this confirmation we will proceed to finalise with SCE.
I look forward to hearing from you on this issue and would be happy to discuss.Regards JonathanJonathan GoldsteinChief Executive Officer
jsg(ä cain i nt. corn
+44 (0) 20 7569 9006
+44 (0) 7767 264 209
<imageOOl .png>
72 Welbeck Street
London WiG OAY
cainint.corn
This email and any attachments may contain confidential information and, where apphcable, may constitute attorney-client privileged communication and/or attorney work product. If this communication is sent for the purpose From: Jonathan Goldstein <[email protected]>
Sent: Tuesday, June 9, 2026 11:39 AM
To: Robert Zarnegin <[email protected]> Cc: Larry Green Cain Dev <[email protected]> Subject: One Beverly Hills - SCE Conduit Dear Robert
I committed to you in our meeting late April that, at your request, we would look at relocating the SCE conduit from South Santa Monica Boulevard to North Santa Monica Boulevard and keep you apprised of what we found. In our meeting, and your subsequent email of May 19, you agreed to cover any extra costs to reroute the line. There are positive signs that the relocation is viable and our current estimate of the incremental costs for moving the SCE conduit will be in the range of $750,000. We can of course evidence this to you. Please reconfirm that if we are able to accomplish this relocation, Peninsula agrees to pay the increased costs. We would bill you during the course of the work. Once we have received this confirmation we will proceed to finalise with SCE. I look forward to hearing from you on this issue and would be happy to discuss. Regards Jonathan Jonathan Goldstein
Chief Executive Officer [email protected]
+44 (0) 20 7569 9006
+44 (0) 7767 264 209
<image001.png>
72 Welbeck Street
London WIG OAY
cainint.com
This email and any attachments may contain confidential information and, where applicable, may constitute attorney-client privileged communication and/or attorney work product. If this communication is sent for the purpose of seeking or providing legal advice, it is intended to be protected by applicable privilege and should be treated accordingly. If you are not the intended recipient, please notify the sender immediately and delete this message. Unauthorized review, use, copying, forwarding, or disclosure maybe prohibited.
Recipients are responsible for ensuring that any attachments are free of viruses. Cain and its affiliates accept no liability for any loss or damage arising from receipt or use of this communication.
Cain International Advisers Limited is an appointed representative of Langham Hall, which is authorised and regulated by the Financial Conduct Authority (register number 746018).
of seeking or providing legal advice, it is intended to be protected by applicable privilege and should be treated accordingly. If you are not the intended recipient, please notify the sender immediately and delete this message. Unauthorized review, use, copying, forwarding, or disclosure may be prohibited. Recipients are responsible for ensuring that any attachments are free of viruses. Cain and its affiliates accept no liability for any loss or damage arising from receipt or use of this communication. Cain International Advisers Limited is an appointed representative of Langham Hall, which is authorised and regulated by the Financial Conduct Authority (register number 746018).
Attachment 2
CITY OF BEVERLY HILLS
DEPARTMENT OF PUBLIC WORKS
455 North Rexford Drive
Beverly Hills, California 90210
Permit No: PW2600515
Status: Issued
08/19/2026
Excavation (PW)
Job Address: 9900 SANTA MONICA BLVD
Project Number: 413079 Applied: 07/30/2026
Project Description: OBH SCE EXECUTIVE CIRCUIT Issued: 08/07/2026 Start Date: End Date: 10/09/2026
Job Description: MP - OBH: EXCAVATION FOR SCE EXECUTIVE WORK. EXTEND SCE LINES
ALONG SOUTH SANTA MONICA BLVD FROM WILSHIRE BLVD TO
CHARLEVILLE BLVD.
Permit Details
Work Location:
Hours:
Parking Meter No:
USA Ticket No:
PEOPLE
Type Name Address Phone License
Applicant Ella Tichy 1840 CENTURY PARK EAST
Applicant BERNADETTE AGCAOILI 1840 Century Park East, Suite 1400 (510) 501-1246 Contractor NICK ANDREJICH 9852 E JOE VARGAS WAY (626) 434-7649 524540
FINANCE
Group Activity Review Paid Balance
Public Right-of-Way (PW) $10,311.30 $95.00 $10,406.30 $0.00 TOTAL $10,311.30 $95.00 $10,406.30 $0.00
TRANSACTIONS
ID Date Method Amount Paid By
896929 08/03/2026 2:48:07 PM CHECK $95.00 BH LUXURY RESIDENCES LLC (finance@caindev.com) 897255 08/07/2026 2:27:27 PM CHECK $7,038.00 BH LUXURY RESIDENCES LLC (finance@caindev.com) 897256 08/07/2026 2:28:47 PM CHECK $3,273.30 BH LUXURY RESIDENCES LLC (finance@caindev.com)
BEVERLW
HILLS
6
PERMIT CONDITIONS
BHMC 7-2-205: COMMERCIAL VEHICLES PROHIBITED FROM USING PRIVATE DRIVEWAYS WITHOUT PERMISSION:
BHMC 7-2-205: COMMERCIAL VEHICLES PROHIBITED FROM USING PRIVATE DRIVEWAYS WITHOUT PERMISSION: No person shall operate or drive a commercial vehicle in, on, or across any private driveway approach or sidewalk area without the consent of the owner or occupant of such property if a sign or markings are in place indicating that the use of such driveway is prohibited. For the purposes of this section, a commercial vehicle shall mean a vehicle having a rated capacity in excess of one-half (1/2) ton. (1962 Code º 3-6.803)
CLASS 'B' EXCAVATION PERMIT
CLASS 'B' EXCAVATION PERMIT Must maintain traffic at all times. Backfill all open excavations or plate with steel traffic plates overnight. Plates shall be recessed in accordance with Standard Drawing BH 113. Must call for inspection prior to backfilling. Backfill and surface restoration shall be in accordance with Standard Drawing BH 114. Two (1) sack sand slurry backfill is required. Must maintain access to adjacent properties. Must maintain sanitation pickup. Must maintain a clear and safe walkway for pedestrian traffic at all times. No sidewalk closure and no diversion of pedestrian traffic without an approved alternate accommodation. Walkway may be temporarily obstructed under the control of flaggers. Provide adequate cones, delineators, barricades and signs to protect the work site as appropriate. No equipment, materials or debris may remain on the Public Right-of-way overnight unless indicated on the permit as a Special Condition. *THE PUBLIC WORKS AND
TRANSPORTATION DEPARTMENT RESERVES THE RIGHT TO REQUIRE TEST/OBSERVATION WELLS BE ABANDONDED AND SEALED IF CONDITIONS WARRANT IT. AFTER THE APPLICANT RECEIVES
NOTIFICATION OF ABANDONMENT, THE APPLICANT MUST IMMEDIATELY MAKE ARRANGEMENTS TO
REMOVE THE EXISTING CONDITION AND RESTORE THE AREA ACCORDING TO THE PUBLIC WORKS AND TRANSPORTATION DEPARTMENT'S SPECIFICATION. FAILURE TO ABANDON WELLS WITHIN THE
TIME LIMITS SPECIFIED, WILL FORCE THE CITY TO TAKE APPROPRIATE ACTION AS DEEMED NECESSARY, AND BILL THE APPLICANT FOR ALL COSTS ASSOCIATED WITH THAT ACTION. *THE
MAIN SHALL NOT BE TAPPED WITHOUT THE SPECIFIC APPROVAL OF THE DIRECTOR OF PUBLIC WORKS AND TRANSPORTATION. IF APPROVED, THE TAP MUST BE PERFORMED BY A LICENSED SEWER CONTRACTOR (C-42) IN THE PRESENCE OF AN INSPECTOR ACTING UNDER THE AUTHORITY OF THE DIRECTOR. ANY CONTRACTOR INSTALLING A NEW WYE OR SADDLE INTO A
CITY SEWER MAIN IS REQUIRED TO REPORT ITS LOCATION (DISTANCE TO NEAREST MANHOLE) TO THE CIVIL ENGINEERING DIVISION OF THE PUBLIC WORKS AND TRANPORTATION DEPARTMENT. ****ONLY VITREOUS CLAY PIPE WILL BE ACCEPTED FOR INSPECTION WITHIN THE PUBLIC RIGHTOF-WAY. *ALL REQUIRED INSURANCE CERTIFICATES MUST BE PROVIDED PRIOR TO ISSUANCE OF A PERMIT. *DEPENDING ON THE SCOPE OF WORK, ADDITIONAL PERMITS/APPROVALS MAY BE REQUIRED. *SPECIAL CONDITIONS/INSTRUCTIONS ON THE PERMIT SHALL TAKE PRECEDENCE OVER GENERAL CONDITIONS.
HEAVY HAUL ROUTES - BHMC 7-2-202: EMERGENCY OR NECESSARY USE OF RESTRICTED STREETS:
HEAVY HAUL ROUTES - BHMC 7-2-202: EMERGENCY OR NECESSARY USE OF RESTRICTED STREETS: The following vehicles may use a street other than designated in section 7-2-203 of this article under the circumstances herein below: A. Any passenger vehicle while operated, engaged, and used for the sole and exclusive purpose of picking up or discharging a passenger or passengers at an origin or destination on any street in which the vehicle is prohibited; B. Any vehicle when necessary, for the purpose of making pick ups and deliveries of goods, wares, or merchandise from or to any premises located on any prohibited street, or for the purpose of delivering materials on a prohibited street to be used in the repair, alteration, remodeling, or construction of any building or structure for which a building permit has previously been obtained; C.
Whenever it is necessary for a vehicle to deviate from the streets designated in section 7-2-203 of this article for the purposes specified in subsection A or B of this section, the vehicle shall travel from a street authorized by section 7-2-203 of this article to the destination by a route so that the point of travel is the shortest possible distance over prohibited streets; provided however, if the additional distance of travel to reach the shortest route would exceed two (2) miles, the vehicle may take the most direct route to its destination. (1962 Code ºº 3-6.1306, 3-6.1306.1)
HEAVY VEHICLE RESTRICTIONS - BHMC 7-2-201: HEAVY VEHICLES RESTRICTED TO CERTAIN STREETS:
HEAVY VEHICLE RESTRICTIONS - BHMC 7-2-201: HEAVY VEHICLES RESTRICTED TO CERTAIN
STREETS: A. No person shall operate any vehicle having a gross weight, including the vehicle and its load, of three (3) tons or more on any street in the city except on those streets designated in section 7-2-203 of the Beverly Hills Municipal Code. IT IS THE RESPONSIBILITY OF THE PERMITTEE TO DISTRIBUTE A COPY OF THIS PERMIT TO ALL OPERATORS OF HEAVY VEHICLES PURSUANT TO THIS CODE. B. The provisions of subsection A of this section shall not apply to the following: 1. Any passenger stage vehicle regulated by sections 1031 through 1036 of the state Public Utilities Code and operating under a certificate from the public utilities commission of the state declaring that the public necessity and convenience require the operation of such vehicle; and further provided that the certificate specifically authorizes such vehicle to be operated in the city, and the vehicle is being operated while in the city for the purpose authorized in such certificate; provided further, this exemption shall not apply to vehicles operated as a round trip sightseeing service; 2. Any vehicle owned by a public utility while necessarily in use in the construction, installation, or repair of any public utility; 3. Any vehicle operated by the city, or any employee thereof, in the course of regular or official city business; 4. Any vehicle of the military or naval forces of the United States or the duly authorized militia of the state in the proper performance of their duties. (1962 Code º 3-6.1306; amd. Ord. 90-O-2088, eff. 2-8-1990)
OVERSIZE HAULING:
OVERSIZE HAULING: Hauling that meets the following criteria may require engineering investigations, routing definition, coordination, police escort, and control of permit movement: (1) Loads in excess of 14 feet wide. (2) Loads in excess of 135 feet in overall length. (3) Loads that are of a weight that require: A) More than a 13- axle, single-vehicle width hauling combination, or B) A 13-axle, single-vehicle width hauling combination with a load deck where the inner axles in the groups bordering the load deck are 40 feet or more apart, or C) Two or more side-by-side vehicles with a combined width of 14 feet or more supporting the load.
STREETS DESIGNATED FOR HEAVY VEHICLE USAGE:
STREETS DESIGNATED FOR HEAVY VEHICLE USAGE: Pursuant to Beverly Hills Municipal Code º 7-2-203, the following streets are designated for use by vehicles exceeding a maximum gross weight, including the vehicle and its load, of three (3) tons: Alden Drive; Bedford Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Beverly Boulevard; Beverly Drive from the south city limits to Santa Monica Boulevard (north); Brighton Way from Canon Drive to Wilshire Boulevard; Burton Way; Camden Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Canon Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Civic Center Drive from Burton Way to Santa Monica Boulevard (south); Crescent Drive between the north and south roadways of Santa Monica Boulevard; Dayton Way from Canon Drive to Wilshire Boulevard; Doheny Drive; Foothill Road from Burton Way to Santa Monica Boulevard (south); La Cienega Boulevard; Linden Drive from Wilshire Boulevard to Santa MonicaBoulevard (south); Maple Drive from Burton Way to Santa Monica Boulevard (south); Olympic Boulevard; Rexford Drive from Santa Monica Boulevard (north) to Burton Way; Robertson Boulevard; Rodeo Drive from Wilshire Boulevard to Santa Monica Boulevard (north); Roxbury Drive from Wilshire Boulevard to Santa Monica Boulevard (north); San Vicente Boulevard; Santa Monica Boulevard (north and south roadways); Third Street; Wilshire Boulevard ***FOR OPERATORS
USING LOMA VISTA DRIVE AS THE SHORTEST PATH FROM AN APPROVED HEAVY HAUL ROUTE TO
THE CONSTRUCTION SITE, PLEASE NOTE THAT THERE IS A TRUCK RUN OFF RAMP AT LOMA VISTA DRIVE LOCATED NORTH OF DOHENY ROAD.
POST "NO STOPPING" SIGNS
POST "NO PARKING" SIGNS PERMIT APPLICANTS MUST POST SIGNS AT LEAST 72 HOURS PRIOR TO WORK ACTIVITY. ANY LESS THAN 72 HOURS, THE SIGNS ARE NOT ENFORCEBABLE. Please notify Police Dispatch when signs have been posted at (310)550-4875. The posting of "NO PARKING" signs is expressly intended to allow access to the curb lane for the loading/unloading of construction related materials and equipment where otherwise impractical. Signs shall not be issued for purposes of construction parking.
Vehicles not actively engaged in the activity specifically indicated on the accompanying permit will be subject to enforcement as posted. Use of nails, tacks, staples or other intrusive method of attachment to City trees shall immediately void the permit. NO PARKING SIGNS Must be removed at the conclusion of the activity or upon expiration, whichever occurs first. Otherwise a permit violation fee will be applied. Sign information shall be complete and legible from the first traffic lane. Signs may not be altered or reused. *VIOLATION OF ANY CONDITION IMMEDIATELY VOIDS THIS PERMIT. *SPECIAL CONDITIONS/INSTRUCTIONS ON THE PERMIT SHALL TAKE PRECEDENCE OVER GENERAL CONDITIONS. *AMENDMENT FEE WILL BE
ADDED TO ANY CHANGES TO THIS PER
TROUSDALE HAULING MEASURES
BEVERLY
HILLS
4
***Special Conditions Regarding the Trousdale Estates Area Transportation Measures*** *Prior to the issuance of a building permit the prime contractor must complete 'Construction Transportation Management Plan' and 'Contractor Acknowledgement' forms (Attachment B and C of the Transportation Measures Document). *No vehicles with loads weighing in excess of 50,400 lbs will be allowed to enter the Trousdale Estates area, regardless of vehicle inspection/certification. Total vehicle + cargo load must be under 50,400 lbs. *Any vehicle over 10,000 lbs Gross Vehicle Weight (GVW) and three or more axles must also contain a secondary braking system that is deemed adequate by the City'->s vehicle inspection agent. *Construction vehicles in excess of 10,000 lbs are only allowed to be in the Trousdale area between the hours of 8:30 am and 3:15 pm on weekdays. *Any vehicle over 10,000 lbs, and less than 50,400 lbs, must provide annual inspection reports to the City of Beverly Hills for certification to be allowed entry into the Trousdale estates area. *Staging of multiple trucks at one site is not allowed within Beverly Hills city limits. Trucks will need to enter and exit the area using the designated hauling routes for Zone 1 or 2, one truck at a time. *It is also required that all vehicles adhere to the regulations set forth by the Trousdale Construction Transportation-Related Measures found here:
www.beverlyhills.org/trousdale.
ADDITIONAL TROUSDALE MEASURES
For approval of hauling in Trousdale, the general contractor must send an email with the following information to [email protected]: ' Associated Site address and Permit # ' Expected date and time of arrival ' Vehicle License Plate # ' Company name and Type of vehicle ' Zone 1 or Zone 2 Hauling Route ' Parking location for vehicle while in Trousdale (public ROW/private property) The contractor must receive a reply email from the City, acknowledging receipt and approval for hauling in the Trousdale area, prior to the truck arriving in the Trousdale Estates. *No vehicles with loads weighing in excess of 50,400 lbs will be allowed to enter the Trousdale area, regardless of vehicle inspection/certification. Total vehicle + cargo load must be under 50,400 lbs. *Construction vehicles in excess of 10,000 lbs are only allowed to be in the Trousdale area between the hours of 8:30 am and 3:15 pm on weekdays.
Restrictions On Construction Activity
No person shall engage in construction, maintenance or repair work which requires a City permit between the hours of 6:00 p.m. and 8:00 a.m. of any day, or at any time on a Sunday or public holiday unless such person has been issued an after hours construction permit. In addition, no person shall engage in such work within a residential zone, or within five hundred (500) feet of a residential zone, at any time on a Saturday unless such person has been issued an after hours construction permit. For the purpose of this Section, "Public Holiday" shall mean:
1. New Year's Day
2. Martin Luther King Jr. Day
3. Presidents Day
4. Memorial Day
5. Juneteenth
6. Independence Day
7. Labor Day
8. Yom Kippur
9. Veterans Day
10. Thanksgiving Day
11. The Friday following Thanksgiving Day
12. Christmas Day
No person employed for the purposes of construction, maintenance, or repair work which requires a city permit shall enter a site on which such work will be done prior to 8:00 a.m. Any violation of this condition shall be deemed to be an infraction.
Public Right of Way Use Conditions of Approval
Typical Conditions for ROW Permits
Applicant must schedule pre-construction meeting using our CitySmart system by visiting https://cs.beverlyhills.org/csportal/ ( at least five (5) business days before the start of work for field coordination and specific conditions.
1. BEVERLY
HILLS
4
2. Notify adjacent residents and/or businesses at least three (3) days prior to starting work.
If "No Parking Signs" are required, applicants must purchase and post the City approved signs at least seventy-two (72) hours prior to start date. Applicants must contact Police Dispatch (310-550-4875) once signs have been posted to verify. All information must be completed on the signs.
3. Working hours are specified on the permit or Municipal Code hours start at 8AM. No weekend work unless authorized by the permit.
4. Coordinate work with the Sanitation Bureau at least two (2) business days before work starts (310-285- 2465).
5. Traffic control shall be per approved, stamped traffic control plans, the latest CAMUTCD or WATCH Manual. Safe vehicle travel must be maintained at all times.
6. 7. Stamped or approved plans and traffic control plans must be on site.
8. No stockpiling of debris or storage of equipment and/or materials is allowed in the public right-of-way.
Sidewalks must maintain 4 feet of safe pedestrian access at all times without diversion unless otherwise approved. Pedestrian traffic control shall comply with the latest edition of the WATCH Manual.
9. Restore full street, alley or sidewalk access at the end of each working day. Work area shall be cleaned at the end of each day to the satisfaction of the PW Inspector.
10. 11. After hours work and inspections are subject to overtime inspection fees.
UNDERGROUND SERVICE DIG ALERT
It is required to call Underground Service Alert (DIG ALERT) at 811 at least two working days before excavating. Underground Service Alert will coordinate with utility owners in the area to mark the locations of buried utility-owned lines. You can also request a ticket online through www.call811.com NOTES
Attachment 3
1 ADDENDUM #4 TO THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT
FOR THE ONE BEVERLY HILLS OVERLAY SPECIFIC PLAN PROJECT
AS CERTIFIED BY THE CITY COUNCIL OF THE CITY OF BEVERLY HILLS (State Clearinghouse No. 2020090048)
Prepared by the City of Beverly Hills in its capacity as the Lead Agency SITE: 9850, 9876, 9900, and 9988 Wilshire Boulevard, Beverly Hills, CA 90210
PROJECT TITLE: One Beverly Hills Overlay Specific Plan Project PROJECT APPLICANT: BH Luxury Residences, LLC and Oasis West Realty EXHIBITS: 1. Certified Final Supplemental Environmental Impact Report and Addenda (web link)
2. Electrical Utility Work Plan and Traffic Control Plans
3. Air Quality and Greenhouse Gas Impact Analysis for the One Beverly Hills Project – Underground Electrical Infrastructure Extension (Prepared by LSA, dated August 6, 2026)
4. One Beverly Hills Underground Electrical Infrastructure Extension Construction Noise and Vibration Impact Analysis (Prepared by LSA, dated August 6, 2026)
PROJECT DESCRIPTION:
The One Beverly Hills Overlay Specific Plan (“Specific Plan”or “Approved Project”) sets forth land use and development standards for the properties located at 9850, 9876, 9900, and 9988 Wilshire Boulevard (“Project site”) in the City of Beverly Hills (“City”). The Specific Plan was approved by the City Council in 2021 through the adoption of Resolution 21-R-13349 amending the General Plan; Resolution 21-R-13350 adopting the One Beverly Hills Overlay Specific Plan; Ordinance 21-O-0238 amending the Zoning Code; and Ordinance 21-O-2839 approving a Development Agreement. As part of the project approvals, the City also certified a Final Supplemental Environmental Impact Report1 (“SEIR”, State Clearinghouse No. 2020090048), adopted a Mitigation Monitoring and Reporting Program MMRP, and adopted a Statement of Overriding Considerations through the adoption of City Council Resolution No. 21-R-13348.
Buildout of the Approved Project is ongoing, with various components at different phases of construction. As part of the utility upgrades necessary for the Approved Project, the applicant is requesting excavation and related permits from the City to complete installation of the underground Southern California Edison (“SCE”) electrical utility line in the public right-of-way (“Proposed Project”). The Proposed Project will include the installation of approximately 795 linear feet of underground electrical conduit and two new underground electrical vaults and related vent lines within the South Santa Monica Boulevard right-of-way in the segment generally located between Charleville Boulevard and Wilshire Boulevard. The Proposed Project will also include approximately 1 The Final SEIR and Addenda are available online at www.beverlyhills.org/environmental Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
2 50 linear feet of underground electrical conduit within Charleville Boulevard, north of South Santa Monica Boulevard.
Work for the Proposed Project will be performed over approximately 39 days as follows:
• Days 1 - 12 (9:00 AM to 9:00 PM) in the area from Wilshire Boulevard to Charleville Boulevard o Work involving high noise generating activities, such as saw cutting and potholing, will not be performed past 6:00 PM.
• Days 12 - 19 (9:00 AM to 9:00 PM) on the segment of Charleville Boulevard on the north side of South Santa Monica Boulevard
o Work involving high noise generating activities, such as saw cutting and potholing, will not be performed past 6:00 PM.
• Days 20 - 39 (9:00 PM to 6:00 AM) in and around the intersection of South Santa Monica and Wilshire Boulevard
o Work involving high noise generating activities may occur during these hours Within the 39 days, approximately 4 days will not have any actual construction work as this time period is required for the asphalt to cure and striping of lanes. As a result, there will be a total of 35 active construction days. No construction in the areas fronting the Peninsula Hotel will be undertaken after 9:00 PM or before 9:00 AM to avoid any perceived impact to hotel guests.
Additionally, in the segment of South Santa Monica Boulevard between Lasky Drive and Charleville Boulevard, all saw cutting, asphalt milling, loaded truck operations, hydro-excavation, and paving will be performed exclusively during the City’s permitted construction hours of 8:00 AM to 6:00 PM, excluding weekends and public holidays.
Construction will proceed in segments, with the work in each segment typical of in-street utility work, including potholing (to avoid other utilities in the street), saw cutting a 5 foot wide section of asphalt for the conduit trench, asphalt grinding to remove the 5 feet wide section of roadway, excavation for the 5 foot wide conduit trench (approximately 6-10 feet in depth), excavation of two subterranean vault locations, installation of conduit, and installation of two precast 7’ x 14’ x 8’ concrete utility vaults (one closer the Wilshire Boulevard end of the segment and another closer the Charleville Boulevard end of the segment). The completed trench alignment and vault locations will be backfilled with slurry base installation and then covered with asphalt. Excavated trench material, totaling approximately 2,500 cubic yards and approximately 215 cubic yards of asphalt pavement, will be periodically hauled offsite. The Proposed Project would also involve the import of 1,100 cubic yards of backfill slurry, 68 cubic yards of aggregate base, and 200 cubic yards of asphalt paving material. Hauling of excavated trench material will involve not more than a maximum of 6 dump trucks on any single day. There will be approximately 18 days of hauling of excavated materials. Steel plates will be set over all open excavations at the end of each work day to maintain roadway access and ensure public safety. Flag personnel will be in the corridor to ensure proper traffic flow during construction activities and to ensure continued access to existing driveways, e.g. for guests to the Peninsula Hotel.
A portion of the work required for the conduit at the Wilshire Boulevard crossing at South Santa Monica Boulevard and repaving on Charleville Boulevard will be performed during nighttime hours Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
3 (9:00 PM to 6:00 AM); this nighttime phase encompasses approximately 15 nights and includes potholing, saw cutting, excavation, conduit installation, slurry backfill, base installation, paving, and final striping, with saw cutting and asphalt grinding undertaken at the initial portion of the nighttime work.
Following completion of the underground utility installation, the disturbed portions of the roadway surface will be restored and lanes restriped. The Proposed Project will be completed entirely within previously disturbed areas in the existing roadway. Exhibit 2 provides a work plan prepared by the project contractor describing each day of construction and related equipment as well as the proposed traffic control plans for each work area and phase.
The Proposed Project does not involve the construction of any new buildings, does not increase the allowable floor area of the Approved Project, does not increase the permitted heights of any buildings, and does not increase the intensity of buildings or uses permitted in the Specific Plan area.
The electrical infrastructure connection is necessary to provide electrical service to the Approved Project.
PURPOSE:
This Addendum to the Final SEIR is being prepared pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines which allows for a lead agency to prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for the preparation of a subsequent EIR have occurred.
Pursuant to CEQA Guidelines Section 15162, no subsequent EIR shall be prepared for the project unless, on the basis of substantial evidence in the light of the whole record, one or more of the following is determined:
(1) Substantial changes are proposed in the project that will require major revisions of the previous EIR due to the involvement of new, significant environmental effects or a substantial increase in the severity of previously identified significant effects; (2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or
(3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the Negative Declaration was adopted, shows any of the following:
(A) The project will have one or more significant effects not discussed in the previous EIR or negative declaration;
Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
4 (B) Significant effects previously examined will be substantially more severe than shown in the previous EIR;
(C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
(D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measures or alternative.
FINDINGS CONCERNING ENVIRONMENTAL IMPACTS OF REVISIONS TO THE PROJECT:
(1) The Approved Project consists of the comprehensive development of the 17.4-acre Project Site, and includes the following:
• New 162 residential unit, 499,706 SF, 32-story, 410’ tall residential building (Santa Monica Residences);
• New 141 residential unit, 424,266 SF, 28-story, 369’ tall residential building (Garden Residences);
• New 37 residential unit and 42 hotel room, 213,966 SF, 11-story, 124’ tall hotel/residential building (Wilshire Building);
• New 127,324 SF structure containing amenities and support areas, including accessory spaces that could be used for staff housing (Promenade); • Replacement of the 37,562 SF, 31’ tall conference center for the Beverly Hilton Hotel; • Replacement of the 72,697 SF, 20’ tall hotel restaurant, retail, 36 hotel room, and support area structure (Beverly Hilton Enhancement); and • 12.7 acres of open space, including an 8-acre botanical garden The Approved Project was reviewed pursuant to the California Environmental Quality Act (Public Resources Code Sections 21000, et seq. (“CEQA”), and the State CEQA Guidelines (California Code of Regulations, Title 14, Sections 15000, et seq.). The City prepared a Final SEIR and, based on the information contained in the SEIR, determined that the Approved Project would result in significant and unavoidable adverse impacts after the implementation of mitigation measures. As a result, the City Council adopted a Statement of Overriding Considerations in conjunction with approval of the Specific Plan.
Based on the analysis contained in the SEIR, the Approved Project would result in the following significant and unavoidable impacts with mitigation:
• Cultural Resources (impacts to historical resources)
• Noise (cumulative constriction-related noise)
Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
5 Based on the analysis contained in the SEIR, the Approved Project was found to result in the following significant impacts that were mitigated to less than significant levels:
• Aesthetics (ambient night-time light levels)
• Air Quality (temporary emissions of criteria air pollutants during construction) • Biological Resources (nesting birds and bat habitats) • Cultural Resources (archaeological resources and human remains) • Energy (long-term operations)
• Geology and Soils (seismic ground shaking)
• Hazards and Hazardous Materials (release of hazardous materials into the environment)
• Hydrology and Water Quality (construction and operational water quality impacts) • Land Use and Planning (consistency with local and regional planning policies) • Noise (construction)
• Public Services (emergency response access)
• Transportation and Traffic (conflict with programs, plans, ordinances, or policies or disrupt local public transit, active transportation, and roadway systems; site access and hazardous traffic conditions; cumulative construction traffic) • Tribal Cultural Resources (impacts to tribal cultural resources resulting from ground disturbing activities during construction)
• Utilities and Service Systems (fire flow facilities)
• Wastewater Treatment (discharge of fats, oils, and grease) The Approved Project was found to result in less than significant impacts or no impacts in the following topic areas:
• Air Quality (consistency with AQMP, temporary localized emissions of criteria air pollutants during construction, long-term emissions of criteria air pollutants during operation, localized CO and TAC emissions)
• Biological Resources (sensitive habitats, riparian habitats, state or federally protected wetlands; conflict with local policies protecting biological resources; conflict with an adopted conservation plan)
• Geology and Soils (earthquake fault rupture)
• Greenhouse Gas (generate GHG emissions or conflict with an applicable plan policy, or regulation adopted for reducing GHG emissions)
• Noise (operational, traffic noise, and construction vibration) • Transportation and Traffic (vehicle miles traveled)
• Utilities and Service Systems (water demand)
The Proposed Project does not change any of the conclusions reached for these topics since it does not result in an increase in floor area, density, hotel rooms, or building height compared to the Approved Project. The Proposed Project would not alter the distribution, location, extent, or density Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
6 of the uses or buildings permitted in the Approved Project and does not alter the approved architectural style or modulation of the buildings. Although the Proposed Project involves installation of an electrical utility line on a street that is not adjacent to the Approved Project site, this location does not affect construction duration or methods, nor does it change operations in a way that would materially change the analysis and impact conclusions in the SEIR and prior addenda (as described below).
(2) On June 8, 2021, the City Council certified the SEIR and approved the Approved Project. In addition, the Final SEIR identified certain mitigation measures that were necessary to mitigate potential impacts of the Approved Project to less than significant levels. The mitigation measures were adopted by the City Council and made binding on the Approved Project (City Council Resolution No. 21-R-13348).
(3) On June 13, 2024, the Planning Commission of the City of Beverly Hills adopted Addendum #1 to the Final SEIR in conjunction with the approval of Resolution No. 2061 approving an amendment to a Conditional Use Permit to re-located temporary construction offices and staging uses related to the Specific Plan buildout to a different site, located at 9900 N. Santa Monica Boulevard.
(4) On October 15, 2024, the Planning Commission adopted Addendum #2 to the Final SEIR in conjunction with the approval of Resolution No. 2072 approving an Administrative Modification of the Specific Plan to allow the installation of a retractable shade canopy structure on the rooftop of the Waldorf Astoria Hotel located at 9850 Wilshire Boulevard. (5) On May 6, 2026, staff prepared Addendum #3 to the Final SEIR in conjunction with a request by the applicant for amendments to the Specific Plan. That application is currently pending review and recommendation by the Planning Commission and final approval by the City Council, and thus Addendum #3 has not yet been adopted. (6) Thereafter, an application for excavation and related permits were submitted (the “Proposed Project” under consideration for this analysis) to the City on July 29, 2026, to allow the installation of the underground electrical utility outlined in the Project Description. (7) Staff analyzed the Proposed Project, along with expert technical analysis prepared by LSA (Exhibits 3 and 4) to determine if any new impacts, or substantial increase in the severity of impacts, would result from the proposed modifications. Pursuant to CEQA Guidelines Section 15162, neither a subsequent nor supplemental EIR is required for the Proposed Project because:
(A) The Approved Project consisted of the comprehensive development of a 17.4-acre site located at 9850, 9876, 9900, and 9988 Wilshire Boulevard, including up to 340 residential condominiums, an Amenity Access Program, and a Promenade (Amenity Area). The Proposed Project intends to install underground electrical utilities on South Santa Monica Boulevard and Charleville Boulevard to serve the Approved Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
7 Project. No new buildings, floor area, additional height, or operational changes are proposed. Since the Proposed Project is limited to utility construction there are no operational impacts to the Approved Project. Additional analysis of the Proposed Project and impact study areas is provided as follows:
Aesthetics. Aesthetic impacts of the Approved Project were screened out pursuant to the provisions of Public Resources Code Section 21099(d) due to the Project Site being in a Transit Priority Area (“TPA”). However, previous environmental documentation analyzed aesthetic impacts based on potential increases to ambient night-time light levels. A mitigation measure was imposed to shield light sources and direct them downward when intended to illuminate walking or working surfaces and focused on the project site to prevent light spillover onto adjacent properties or roadways. The Proposed Project would consist of installing underground electrical utilities during the construction phase of the Approved Project. The Proposed Project would not create any new light sources or result in any changes to project aesthetics. Previously required mitigation measures would still be applicable. Accordingly, the Proposed Project would not result in any new aesthetics impacts, nor would it increase the severity of previously identified significant impacts.
Air Quality. The SEIR for the Approved Project identified construction-related emission impacts resulting from use of heavy-duty construction equipment, fugitive dust mobilized by export of demolition debris and soil export, and the evaporation of VOCs from architectural coatings, which were mitigated to a less than significant level. The Final SEIR’s construction analysis encompassed extensive demolition, mass grading, and building construction over an approximately 50-month period, including 550,000 cubic yards of soil export. The Final SEIR determined that the Approved Project’s unmitigated maximum daily construction-phase NOX emissions would exceed the South Coast Air Quality Management District (SCAQMD) regional threshold of 100 pounds per day, primarily due to haul truck emissions from mass soil export and concurrent operation of heavy-duty demolition and grading equipment. Through implementation of mitigation measures, maximum daily NOX emissions would be reduced to 69 pounds per day, below the regional threshold. Architectural coatings were the primary source of VOC emissions in the Final SEIR analysis.
The Proposed Project involves limited, short-term construction activities in the public right-of-way that are substantially smaller in scale, duration, and intensity than the activities studied in the Final SEIR. The Proposed Project duration is a total of 39 days, of which only 35 would involve active construction activities that would generate emissions, and construction equipment would not all be operating concurrently on any given day. The Proposed Project would involve the export of approximately 2,500 cubic yards of trench material and approximately 215 cubic yards of removed asphalt pavement, as well as import of 1,100 cubic yards of Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
8 backfill slurry, 68 cubic yards of aggregate base, and 200 cubic yards of asphalt paving material. LSA prepared an analysis of the air quality impacts of the Proposed Project using the same methodology as the Final SEIR, with adjustments made for applicable SCAQMD thresholds based on the proximity of the Proposed Project to sensitive receptors as well as the size of the work area for the Proposed Project (Exhibit 3). LSA’s analysis found that the Proposed Project would not exceed shortterm regional construction emissions thresholds for VOCs, NOX, CO, SOX, PM10, or PM2.5, nor would they exceed localized construction emissions thresholds for NOX, CO, PM10, or PM2.5 with previously required mitigation measures. Based on LSA’s analysis, the Proposed Project would not result in a substantial increase in severity of air quality impacts as compared with those disclosed in the Final SEIR. Regional construction emissions and localized impacts associated with the Proposed Project remain below the applicable SCAQMD thresholds.
The Proposed Project would also not result in any additional or more severe operational air quality impacts from mobile source emissions, as the Proposed Project does not involve any new buildings, floor area, height, increase in capacity, or changes to operations. Furthermore, the mitigation measures applicable to the Approved Project would continue to apply to the Proposed Project, thereby further limiting any potential emissions. Accordingly, the Proposed Project would not result in any new air quality impacts, nor would it increase the severity of previously identified significant impacts.
Biological Resources. The SEIR identified potentially significant impacts to locally important wildlife species, specifically nesting birds and roosting bats. The analysis found that certain trees located on the Los Angeles Country Club site would have high potential to support nesting birds and raptors, and the building on the gas station site at 9988 Wilshire Boulevard could also have potential for nesting birds as well as roosting bats. The SEIR imposed mitigation measures requiring demolition, construction, ground disturbance, and vegetation clearing activities in such a way as to avoid protected nesting birds by not initiating these activities during avian breeding and nesting season without a pre-construction survey conducted by a qualified biologist for active bird nests covering the construction footprint plus a buffer of 500 feet. Another mitigation measure was imposed requiring a clearance survey to determine if bats are roosting in the Spanish tile roof of the gas station located at 9988 Wilshire Boulevard. Since construction of the Approved Project has commenced, demolition of the gas station has been completed, and additional demolition and ground disturbance activities have commenced in compliance with all required mitigation measures. No bat roosts were found, and buffers were implemented around identified bird nests on the construction site pursuant to the recommendations of a qualified biologist. The Proposed Project would not result in any new structures or demolition of any other structures that were previously analyzed as part of the Approved Project. Therefore, there are no existing structures that could serve as suitable bat habitat would be Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
9 disturbed. The Proposed Project also does not involve the removal of any trees or vegetation that could serve as suitable bird habitat. Furthermore, mitigation measures requiring nesting bird surveys would still be applicable to prevent impacts to any nesting birds. Accordingly, the Proposed Project would not result in any new impacts to biological resources, nor would it increase the severity of previously identified significant impacts.
Cultural Resources. The SEIR for the Approved Project identified significant and unavoidable impacts to the Beverly Hilton Hotel property, which is a historical resource. Mitigation measures were imposed, and a statement of overriding considerations was adopted. The Proposed Project involves excavation within South Santa Monica Boulevard and Charleville Boulevard, both public rights-ofway that have been previously disturbed through roadway construction, prior utility installations, and ongoing maintenance. The Proposed Project does not involve any additional demolition or otherwise impact the historical resources identified at the Beverly Hilton Hotel property or any other identified historical resources. The Proposed Project would involve subsurface excavation of limited depth in areas that have been previously disturbed. To the extent that the excavation could potentially encounter previously unknown archaeological resources, Mitigation Measure CR-3a, which sets forth requirements in the event of a previously unknown artifact is uncovered during project construction, would still apply. With existing mitigation measures, the Proposed Project would not result in any new impacts on any historical resources, nor would it increase the severity of previously identified significant impacts.
Energy. Energy impacts of the Approved Project were identified in prior environmental documentation and were based on a requirement for permanent grid connections for electricity and natural gas service to power internal and exterior building lighting and heating and cooling systems for long-term operation.
These impacts were mitigated to less than significant levels by requiring compliance with energy conservation requirements of the California Energy Code and California Green Building Standards Code, as well as additional mitigation measures, including Mitigation Measure ENG-1, which requires that the applicant “make necessary alterations to the generation or distribution system as required by SCE.” The Proposed Project is the installation of the electrical infrastructure to connect to the SCE distribution system consistent with this mitigation measure.
The SCE infrastructure connection itself does not increase operational energy demand beyond what was studied in the Final SEIR. Rather, it provides the delivery mechanism for the electrical service already contemplated. The Proposed Project does not involve any building expansion or additional floor area, nor would it introduce more energy intensive land uses as compared to the Approved Project.
Thus, the Proposed Project would have similar energy demands as compared to the Approved Project, since the Proposed Project does not represent a significant change or increase in the size or scale of uses, light fixtures, or other energy Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
10 intensive features. The Approved Project would still be subject to the California Energy Code and Green Building Standards Code requirements, and conditions of approval requiring LEED Gold certification would continue to apply. Therefore, the Proposed Project would not result in any new energy impacts, nor would they increase the severity of previously identified significant impacts.
Geology and Soils. Geology and soils impacts of the Approved Project had to do with seismically induced ground shaking that could damage structures and infrastructure, resulting in loss of property or risk to human safety. The Santa Monica Fault Zone is designated as an Alquist-Priolo Earthquake Fault Zone, and the Proposed Project is not located within 50 feet of this Fault Zone. Both the Approved Project and the Proposed Project would be required to comply with applicable provisions of the Beverly Hills Municipal Code (“BHMC”) and California Building Code. With adherence to the applicable code requirements and mitigation measures, the Proposed Project would not result in any new geology or soils impacts, nor would it increase the severity of previously identified significant impacts.
Greenhouse Has Emissions. Construction and operation of the Approved Project would generate temporary and long-term Greenhouse Gas (“GHG”) emissions. The Final SEIR determined that the Approved Project’s total GHG emissions would result in an increase of 2,564.8 MT CO2e per year as compared to existing conditions, which would not exceed the SCAQMD brightline threshold of 3,000 MT CO2e per year, nor would it exceed the locally applicable, project-specific efficiency threshold of 3.2 MT CO2e per service person per year. The Final SEIR determined that the Approved Project’s construction emissions would be about 587 MT CO2e per year. As a result, the Final SEIR concluded that the Approved Project’s GHG emissions would be less than significant and did not require GHG mitigation measures. The Final EIR also cited numerous sustainability features, including commitments to achieve LEED and WELL certification, as well as energy- and water-efficient building design features that reduce long-term operational energy use and GHG emissions.
The Proposed Project does not involve any changes to the Approved Project operations, and all conditions of approval relating to sustainability are applicable.
The Proposed Project would generate temporary construction-related GHG emissions from the operation of construction equipment during conduit and vault installation as well as from worker and building supply vendor vehicles during the construction period. Based on the air quality and GHG analysis provided by LSA, the Proposed Project would generate approximately 84.1 MT CO2e during construction, which when amortized over a 30-year project life, would equal approximately 2.8 MT CO2e per year. When combined with the GHG emissions modeled for the Approved Project, the Proposed Project would not exceed the SCAQMD recommended brightline threshold of 3,000 MT CO2e per year, nor would Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
11 it exceed the locally appliable, project-specific efficiency threshold of 3.2 MT CO2e per service person per year. Therefore, the Proposed Project would not result in any new GHG emissions impacts, nor would it increase the severity of previously identified significant impacts.
Hazards and Hazardous Materials. Hazards and hazardous materials impacts of the Approved Project were focused on the removal of the gas station located at 9988 Wilshire Boulevard, which had gas pumps and a canopy structure, three underground storage tanks, and a convenience store, as well as other buildings at the Approved Project Site which may have contained asbestos, lead-based paints, and/or PCB’s that would be demolished as part of the Approved Project. Since construction of the Approved Project commenced, all structures at the gas station site, including underground storage tanks, have been removed in compliance with all applicable mitigation measures. Other building demolition at the Approved Project site has also been completed in compliance with all applicable mitigation measures.
The Proposed Project involves limited excavation within the South Santa Monica Boulevard and Charleville Boulevard public rights-of-way. These corridors have been previously disturbed and are not located in close proximity to any known sites that are subject to active environmental investigations or ongoing remediation. As discussed in the Final SEIR Section 4.6, Hazards and Hazardous Materials, “[t]he management of hazardous materials and hazardous wastes is regulated at the federal, state, and local levels through programs administered by the U.S.
Environmental Protection Agency; agencies within the California Environmental Protection Agency, such as the Department of Toxic Substances Control and the State Water Resources Control Board; federal and state occupational safety agencies, such as the Occupational Safety and Health Administration and the Division of Occupational safety and Health; and locally by the Los Angeles County Fire Department Health and Hazardous Materials Division. If contaminated soils or other hazardous materials are encountered during excavation, the applicant would be required to comply with all applicable local, state, and federal regulations for handling and disposal of such materials.” Additionally, existing underground utilities beneath the roadways would be identified through utility locating procedures (potholing) prior to construction to avoid accidental damage.
Accordingly, with compliance with existing regulations relating to the handling of hazardous materials, the Proposed Project would not result in any new impacts related to hazards or hazardous materials, nor would it increase the severity of previously identified significant impacts.
Hydrology and Water Quality. Water quality impacts of the Approved Project were identified in prior environmental documentation and were based on demolition and construction related water quality impacts as well as parking lot/garage generated pollutants and runoff from landscaped areas. Mitigation measures were imposed Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
12 requiring preparation of a Notice of Intent and Stormwater Pollution Prevention Plan in accordance with State requirements, as well as submittal of a Standard Urban Stormwater Mitigation Plan in accordance with Los Angeles County requirements.
With these mitigation measures, impacts were found to be less than significant. The Proposed Project involves limited excavation within the South Santa Monica Boulevard and Charleville Boulevard public rights-of-way, which would temporarily expose soils and generate sediment-laden runoff if not properly managed. The Proposed Project would be subject to the same mitigation measures as the Approved Project, including Hydro-1 and Hydro-2, and would be required to implement the appropriate Best Management Practices during construction to prevent sediment and other pollutants from entering the storm drain system.
Accordingly, the Proposed Project would not result in any new impacts to hydrology or water quality, nor would it increase the severity of previously identified significant impacts.
Land Use and Planning. The Approved Project was found to be consistent with applicable local and regional planning policies, regulations, and standards with implementation of various mitigation measures throughout the Final SEIR, and as a result, impacts were found to be less than significant. The Proposed Project is required for the implementation of the Specific Plan and does not result in any increase in floor area, density, hotel rooms, or building height compared to the Approved Project. The Proposed Project would not alter the distribution, location, extent, or density of the uses or buildings permitted in the Specific Plan and does not alter the approved architectural style or modulation of the buildings. Therefore, it is consistent with the applicable development standards.
The Proposed Project involves typical utility installation in public rights-of-way to provide adequate electrical service the One Beverly Hills project. Section 5.2 of the Specific Plan identifies General Plan goals and policies that would be advanced by the Approved Project. The Proposed would not conflict with any of the goals and policies listed therein, and would further support the following policies from the General Plan:
• CON 18.1 New Development Requirements:Require that new development is approved contingent upon the ability to be served with adequate electrical facilities and service.
• CON 18.2 Adequate Facilities: Work with Southern California Edison and the City’s Department of Public Works and Transportation to ensure that adequate electrical facilities are available to meet the demand of existing and future development, and to encourage conservation.
• CON 18.3 Underground Utilities: Continue to provide for the undergrounding of new and existing electrical distribution lines unless it is Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
13 determined not to be economically or practically feasible in a particular location as a result of significant environmental or other constraints.
Explore innovative funding sources for undergrounding utilities.
The Proposed Project would be consistent with the above General Plan policies because it consists of enhancing electrical utilities to provide adequate service for new development. The utilities would be fully underground, and the full cost of the enhancements would be borne by the applicant, with no funding required by the City.
Approval of the Proposed Project would be consistent with local planning policies, regulations, and standards, and all mitigation measures required in the Final SEIR for the Approved Project would continue to apply to the Proposed Project.
Accordingly, the Proposed Project would not result in any new land use and planning impacts, nor would it increase the severity of previously identified significant impacts.
Noise. Potentially significant noise impacts related to Approved Project construction and significant and unavoidable noise impacts related to cumulative construction noise were identified in the Final SEIR. Specifically, the impacts resulted from exceedance of 5 dBA above ambient noise levels before 8:00 a.m. or after 6:00 p.m. With implementation of mitigation measures, impacts related to Approved Project construction were reduced to less than significant, however cumulative construction noise impacts remained significant and unavoidable. A statement of overriding considerations was adopted by the City Council in its approval of the Approved Project.
With respect to construction noise impacts, the Final SEIR analyzed whether construction noise occurring at the One Beverly Hills project site would result in a noise increase of 5 dBA or more outside the hours permitted by the City’s Noise Ordinance, or would increase noise by 5 dBA or more during daytime hours at a school, hospital, church, or institute of learning. The Final SEIR concluded that the Approved Project would generate construction noise levels in excess of 5 dBA above ambient noise levels at El Rodeo school during simultaneous occurrence of the demolition, grading, and building construction phases and during simultaneous occurrence of the building construction, architectural coating, and paving phases.
Similarly, the Final SEIR concluded that construction activities for the Approved Project would generate noise levels in excess of 5 dBA above ambient noise levels outside the hours permitted by the City’s Noise Ordinance for residences to the north of the One Beverly Hills project site. However, the Final SEIR concluded that these impacts would be less than significant through compliance with applicable provisions of Mitigation Measure NOISE-1, which includes various requirements such as avoiding simultaneous construction phases, the use of mufflers and sound enclosures, and placement of heavy equipment to direct noise away from sensitive Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
14 receptors. The Final SEIR also found that construction traffic from the Approved Project would not generate noise in excess of 5 dBA above ambient noise levels, and therefore off-site construction noise impacts would be less than significant.’ LSA prepared an analysis of the potential noise and vibration impacts of the Proposed Project (Exhibit 4). Based on this analysis, construction-related traffic would increase noise levels by up to 0.7 dBA above ambient noise levels, which would not exceed the 5 dBA noise threshold. LSA also modeled the potential noise impacts of construction activities, including the use of various types of construction equipment based on information provided by the applicant and their contractor. Based on the Project Description, the work that requires the highest noise-generating equipment, such as saw cutting and potholing, would occur on weekdays during the hours of 9:00 AM and 6:00 PM. Other activities that would occur outside of those hours would result in an increase in ambient noise levels by up to 8.8 dBA between 6:00 PM and 9:00 PM and up to 17.8 dBA between 9:00 PM and 6:00 AM without the implementation of mitigation measures. Since activities during these hours would exceed the City’s 5 dBA threshold, unmitigated noise from the Proposed Project during these periods would be potentially significant.
However, with the implementation of mitigation measure NOISE-1, which was already adopted by the Final SEIR, noise would be reduced to within 5 dBA above ambient noise levels. Therefore, noise generated from construction of the Proposed Project outside of the City’s permitted construction hours would be less than significant with implementation of mitigation measure NOISE-1.
With respect to operational off-site traffic noise impacts, the Proposed Project would not introduce any new land uses or increase in the density or intensity of previously approved land uses. The Proposed Project involves installation of underground electrical utilities to serve the Approved Project and vehicular traffic associated with the Proposed Project would be temporary in nature. Thus, the Proposed Project would not generate substantially increased long-term operational vehicular traffic and would not create any new off-site traffic noise impacts.
The Final SEIR also evaluated construction vibration associated with the Approved Project’s use of construction equipment including jackhammers, loaded trucks, and bulldozers and determined that transient vibration levels would not exceed the thresholds for daytime human annoyance or structural damage to historic buildings or residential structures from occasional pass-bys of construction equipment. LSA provided an analysis of construction vibration for the Proposed Project, assessing whether vibration levels would exceed thresholds for receptors near the Proposed Project work area, including the commercial businesses, the nearest residential building (Rosewood Residences), the Peninsula Hotel, and single-family residences north of Wilshire boulevard. The analysis found that the vibration levels would not exceed the 0.500 in/sec PPV transient vibration damage threshold, nor would they exceed the 0.240 in/sec PPV transient vibration Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
15 annoyance threshold for any of these receptors. With respect to nighttime vibrations, the nearby commercial receptors would not be in operation during night work and the Project Description indicates that there would be no nighttime construction activities near the Peninsula Hotel or the Rosewood Residences.
Therefore, the night-time vibration annoyance threshold would not be applicable.
All noise-related mitigation measures would continue to apply to the Proposed Project, further reducing the potential for construction noise impacts. Therefore, the Proposed Project would not result in any new noise impacts, nor would it increase the severity of previously identified significant impacts.
Public Services. Public services impacts of the Approved Project were identified in prior environmental documentation and were based on statements from the Beverly Hills Fire Department that the proposed traffic signal at the intersection of Merv Griffin Way and Santa Monica Boulevard could potentially slow emergency response times and inhibit access to the site, but that impacts would be less than significant with implementation of a mitigation measure requiring certain technical changes to the proposed traffic signal. The Proposed Project does not involve any changes to the proposed traffic signal contemplated in the Approved Project, and the mitigation measure would continue to apply. The Proposed Project would involve temporary construction activities within the South Santa Monica Boulevard and Charleville Boulevard public rights-of-way that would require temporary lane closures. However, the Construction Traffic management Plan required by mitigation measure TRAF-5 includes provisions for maintaining emergency access and coordinating with emergency service providers. Accordingly, the Proposed Project would not result in any new impacts to public services, nor would they increase the severity of previously identified significant impacts.
Transportation and Traffic. Transportation and traffic impacts of the Approved Project were determined to be less than significant with mitigation. The Proposed Project involves temporary construction activities to install underground electrical utilities and would not have any effect on the density or intensity of the land uses in the Approved Project. Thus, the Proposed Project would not generate any additional operational traffic than was already analyzed as part of the Final SEIR for the Approved Project.
The Final SEIR analyzed construction traffic impacts including haul truck traffic, delivery and staging of materials, worker traffic, and temporary lane and sidewalk closures. South Santa Monica Boulevard has two travel lanes in each direction and is classified as a Minor Arterial between the western City limit and Wilshire Boulevard where the Proposed Project would occur. The Proposed Project would involve temporary construction activities within the South Santa Monica Boulevard and Charleville Boulevard public rights-of-way, requiring temporary lane closures during various periods of active work operations. These closures would be Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
16 temporary and limited to the active work zone, and traffic control measures would be implemented to maintain traffic flow and pedestrian access. The Proposed Project would comply with applicable mitigation measures, including TRAF-5, which requires preparation of a Construction Traffic Management Plan. The Proposed Project would occur over a 39-day period using a maximum crew of 36 personnel on peak days. This amounts to approximately 2% of the Approved Project’s peak daily workforce estimate of 2,400 personnel.
All mitigation measures from the Approved Project would continue to apply to the Proposed Project. Accordingly, the Proposed Project would not result in any new transportation or traffic impacts, nor would it increase the severity of previously identified significant impacts.
Tribal Cultural Resources. Impacts to tribal cultural resources for the Approved Project were determined to be less than significant with mitigation. The Final SEIR required monitoring by two consulted tribal organizations during construction that would involve ground disturbing activities such as grading and surface excavation, which would have the potential to unearth or adversely affect previously unidentified significant tribal cultural resources. The Proposed Project involves excavation within previously graded and disturbed roadways. Nonetheless, all mitigation measures from the Approved Project would continue to apply to the Proposed Project. Accordingly, the Proposed Project would not result in any new impacts tribal cultural resources, nor would it increase the severity of previously identified significant impacts.
Utilities and Service Systems. Impacts to utilities and service systems for the Approved Project were determined to be less than significant with mitigation. The Final SEIR analyzed the impact of additional population, building height, and development area to the Approved Project site as compared to existing conditions, as well as the impact of increased water demand. Mitigation measures were imposed requiring review of fire flow requirements and a hydraulic analysis to determine the need for upgrades to City water mains.
The Proposed Project involves installation of SCE electrical distribution infrastructure in connection with the implementation of the Approved Project. As part of the previous environmental documentation, including the Final SEIR, electrical distribution system upgrades were contemplated by mitigation measure ENG-1, which requires that the applicant “make necessary alterations to the generation or distribution system as required by SCE.” The Proposed Project would occur within the South Santa Monica Boulevard and Charleville Boulevard public rights-of-way, where existing underground utilities may include water mains, sewer lines, gas lines, and telecommunications infrastructure. Existing underground utilities beneath the roadways would be identified through potholing prior to construction to avoid accidental damage. The Proposed Project does not increase Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
17 water demand, affect fire flow capacity, or otherwise alter the demand for utility services associated with the Approved Project.
Additionally, wastewater treatment impacts of the Approved Project were identified in prior environmental documentation and were based on the potential for the restaurant use in the Approved Project to generate heavier discharge of fats, oils, and grease, which was considered a potentially significant impact that was mitigated to less than significant. The Proposed Project involves construction of underground electrical utilities and would not increase the total floor area of restaurants or other uses that would generate fats, oils, or grease.
Accordingly, the Proposed Project would not result in any new impacts to utilities and service systems, nor would it increase the severity of previously identified significant impacts.
(B) There are no changes with respect to the circumstances under which the project is undertaken that will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of a previously identified impact. Since approval of the Approved Project, the City of Beverly Hills has not approved any new significant development projects within the vicinity of the Project site. Further, the Proposed Project will not result in any cumulatively considerable change in the Approved Project impacts. Accordingly, no cumulative impacts from the construction and/or operation of the Proposed Project are anticipated. Consequently, the circumstances under which the Proposed Project would be undertaken have not changed when compared to the circumstances in place during approval of the Approved Project.
Staff has identified no new information of substantial importance to suggest that (A) The project will have one or more significant effects not discussed in the previous EIR or negative declaration; (B) Significant effects previously examined will be substantially more severe than shown in the previous EIR; (C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or (D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measures or alternative.
All mitigation measures adopted in conjunction with the Approved Project continue to be imposed on the Proposed Project.
(8) Therefore, pursuant to CEQA Guidelines Section 15164, the City has prepared this Addendum #4 to the Final SEIR, which documents that the Proposed Project would not result Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
18 in any of the conditions described in Section 15162, including that the changes would not result in new, significant environmental effects or a substantial increase in the severity of previously identified significant effects.
Prior to taking any action on the Proposed Project, the decision maker will consider this Addendum and its Exhibits, along with the previously certified Final SEIR and Addenda For any questions regarding this matter, please contact Andre Sahakian, AICP, Project Manager in the Beverly Hills Community Development Department at (310) 285-1121.
By:
Andre Sahakian, AICP, Project Manager
Date: August 7, 2026
Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
EXHIBIT 1
Certified Final Supplemental Environmental Impact Report (State Clearinghouse No. 2020090048) and Addenda are available at www.beverlyhills.org/environmental
Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
EXHIBIT 2
Electrical Utility Work Plan and Traffic Control Plans
APPROVED TCP: OBH S Santa Monica TCP West of Wilshire Potholing 9:00AM - 9:00PM Day 1:
- Potholing of both vault locations & mainline conduit
- Sawcut and asphalt grinding
- Start excavation of mainline conduit trench and West Vault location - Set Plates
Day 2:
- Excavation of mainline conduit trench and West Vault location - NOVA inspection
- Mainline conduit installation
- Set Plates
Day 3:
- West Vault and mainline conduit installation
- SCE inspection
- Slurry backfill of West Vault (48-hour cure time)
- Set Plates
Day 4:
- Slurry backfill of mainline conduit & removal of West Vault shoring - Set Plates
CONSTRUCTION AREA 1
CHARLE VLLt BLVD. 2 uww
WILSHIRE BLVD. so ww
N. LINDEN DR. T llllr
S. SANTA MONICA BLVD 2» vw
WILSHIRE BLVD. zs ' vww
u--oe(Lr)¥
S. UASKY DR. z ww
----------------•-•------------te---�
¥
T
OU] S. SAN
TA MONICA BLVD 2 vw
«
OU]
CHARLEVILLE BLVD.
APPROVED TCP: OBH S Santa Monica TCP Rev10.2 9:00AM - 9:00PM Day 5: - Excavation of East Vault location- Excavation of east mainline conduit- Sawcutting, asphalt grinding of west mainline conduit- Excavation of west mainline conduit- Set Plates Day 8: - SCE Inspection- Slurry backfill west mainline conduit- Slurry backfill east mainline conduit- Set Plates Day 6: - Installation of East Vault- Installation of west mainline conduit- Installation of east mainline conduit- Set Plates Day 7: - Slurry backfill and shoring removal of East Vault- Installation of west mainline conduit- Installation of east mainline conduit- Set Plates CONSTRUCTION AREA 2
""
«€ «
S. SANTA MONICA BLVD 2» vw
a
,-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
--,POSTTAN.5.A.T
--. -
-
-
-
-
-
-
-
-
-
-
-
-
--
.p
f4"
WILSHIRE BLVD. 2» w
o-± taoee
"" "'
• WILSHIRE BLVD.
S. SANTA MONICA BLVD zs www
00' J
)+020L) +Hr2O-
«e
,
� ¢
5 om It 020-2l
T N. LINDEN DR. 2 w
CHARLEVILLE BLVD. ww
APPROVED TCP: OBH S Santa Monica TCP Rev10.2 9:00AM - 9:00PM Day 9:
- Pothole for vents
- Sawcut & grind asphalt
- Excavate vents and any remaining mainline conduit
- Set Plates
Day 10:
- Install vents
- Install any remaining mainline conduit
- Slurry backfill trench
CONSTRUCTION AREA 3
>
S. SANTA MONICA BLVD zs we
S. LASKY DR. zs vw
WILSHIRE BLVD. so we
• wo-1 tezo-2z
u4--98(LT)¥
�
WILSHIRE BLVD. 2zs ve
S. SANTA MONICA BLVD as uw
)+HW4-2(LT)
HC20(LT)
=
<d «#
=
<z
= = ◊
= =
1 •
oz0-2 ' r· N. LINDEN DR. 2s PH
H2O--1
APPROVED TCP: OBH S Santa Monica TCP Rev10.2 9:00AM - 9:00PM Day 11*:
- Pothole for Vents
- Sawcut & grind asphalt
- Excavate vents
- Set Plates
Day 12*:
- Install vents
- Slurry backfill
*all construction work associated
with vent line installation to cease
by 6:00 PM.
CONSTRUCTION AREA 4
S. SANTA MONICA BLVD 2s ve
12'
MAX
c30(c)NC3JOA(CA)
50'
�
85'
TANGENT SHIFTING TAPER
ff"Ash[
G20-2
co
co
3%
g8
4--98(L1)
l%-oe(
¥
w20--1
i
POST TAN.SAT:
TAPER
125'
MERGING TAPER
z +AW4-2(L)+HC20(L7) H
S. LASKY DR. 2s ve
CHARLEVILLE BLVD. 25 MPH
Day 13:
- Potholing of main line conduit
- Sawcut, asphalt grinding
- Set Plates
Day 14:
- Excavation of mainline conduit
- Set Plates
Day 16:
- Installation of mainline conduit
- Set Plates
Day 17:
- Slurry backfill
- Set Plates
Day 15:
- Excavation of mainline conduit
- Installation of mainline conduit
- Set Plates APPROVED TCP: OBH S Santa Monica TCP Rev10.2 9:00AM - 9:00PM Day 18:
- Base & Pave Mainline on SSMB with 48
hour cure time completed for construction
areas 1-5.
Day 19:
- Base & Pave Mainline on SSMB with 48
hour cure time completed for construction
areas 1-5.
CONSTRUCTION AREA 5
+H Cc20(RT) HW20--1
:
MIR#fo
9846
MIR#o MTR#o
9850 9848
MTR#
09857
MIR o
9852
w1-6(LT)
MIR#o
9854
MTR# MTR#
09861 09859
FAS(LT)
8 MTR# MTR#
0 9865 0986.3
MIR#o
9856
10 IN
c3o(cA)
j@so(c)
MTR#
0 9867
MIR#o
9858
MTR#
0 9869
MTR# MTR#
09875 09873
S. SANTA MONICA BLVD 2s w
(27(CA)
(c27(CA) «8]
i-----501 - •
-------------POST
--gt~pp -fRGI:NG :�T-A9f SAT.-----1----. 00-. ----00- -'\.--l -1100·7 f
20-2
MTR# MIR#
09901 09899
= =
=
=
= =
= - - - - - =
= =
= =
MIR#o
, ,
9902 III w20-1
l .co l
• G20-
e
2 ¥
w20--1
MTR#
0990.3
MIR#o
9904
MTR#
0 9905
MTR#
0 9907
MIR#o MTR#o
9908 9906
MTR#
09909
MIR#o
9912
CHARLEVILLE BLVD. 25 MPH
APPROVED TCP: OBH S Santa Monica TCP Rev9.1
Day 20 (Night work):
- Potholing of mainline conduit
- Sawcutting and asphalt grinding
- Start excavation
- Set Plates
Day 21 (Night work):
- Excavation of mainline conduit
- Installation of mainline conduit
- Set Plates
Day 22 (Night work):
- Installation of mainline conduit
- Slurry backfill
- Set Plates 9:00PM - 6:00AM
CONSTRUCTION AREA 6
N. LINDEN DR. as v
125'
MERGING TAPER
)+Hc20(L) HW2O-1
= <z «
=
= <
=
S
= ◊
=
=
3 » =
II
1"
zo-2 ¥
w20-1
,..- _- _- _- _- _- _- _- _- _- _-
--
_- _- _- _- _- _- _- _-
--
_- _- _- _- _-
-_J_
•
"' "'
WILSHIRE BLVD. 2s ve
S. SANTA MONICA BLVD 25 MPH
?t'
0omoaooooooooooooooooaoi «
=
S. LASKY DR. 2s we
,mooooooooecaaanrccooooosidp, ,
SANTA MONICA BLVD
.zr
R47A
WILSHIRE BLVD. 2s we
� "' "'
APPROVED TCP: OBH S Santa Monica TCP Rev9.1 9:00PM - 6:00AM Day 23 (Night work):
- Potholing of mainline conduit
- Sawcutting and asphalt grinding
- Start excavation
- Set Plates
Day 24 (Night work):
- Excavation of mainline conduit
- Installation of mainline conduit
- Set Plates
Day 25 (Night work):
- Installation of mainline conduit
- Slurry backfill
- Set Plates
CONSTRUCTION AREA 7
c2oX2)
3%
¢
,I>
9 & °
+w4-2(L)+4 )H
«
i
S. LASKY DR. 2s ww
_,_ __ ,oo·_J BUFFER
»
xw1-2(2)
EX.W16-11P(2)
« «
w20--f
ooinooaoooaooomocotif'_
-u
= ='s--�------
s__= he GS) =
== -van =e
aw ocaw·"
= a'ea0000a0po0oonooooooooooon e=
,
[I
APPROVED TCP: S Santa Monica Blvd (Wilshire Crossing) Revision - 9 of 12 9:00PM - 6:00AM Day 26 (Night work):
- Potholing of mainline conduit
- Sawcutting and asphalt grinding
- Start excavation - Set Plates
Day 27 (Night work):
- Excavation of mainline conduit
- Installation of mainline conduit
- Set Plates
Day 28 (Night work):
- Installation of mainline conduit
- Slurry backfill
- Set Plates
Day 29 (Day work): - Base remaining sections starting
with Charleville and SSMB
Day 30 (Night work):
- Base remaining sections
Day 31 (Night work):
- Pave remaining sections
through Wilshire Blvd.
Day 32 (Night work):
- Pave remaining sections
through Wilshire Blvd.
Day 33 (Night work):
- Pave remaining sections
through Wilshire Blvd.
Day 38 (Night work):
- Final Striping
Day 39 (Night work):
- Final Striping
CONSTRUCTION AREA 8
-See Construction Area 5
j
EX.W11-2(2)
EX.W16--11P(2)
WILSHIRE BLVD. so vww
S. SANTA MONICA BLVD 2zs ve
l %»5o. TAPER 125'
50'
FiS(
- w1-6(R1)
G20-2
-
= ¢ca
=
R4--7A =
¢ca
-<=
¢
=
=
II I
G2\ ·2
-
E
"' g
or
o
z
Ll
o
z
- ui
4 g
� w20-1
x
Daily Work Descriptions
Project Duration
39 Working Days (33 primary construction days plus 2 final striping days and curing period between paving and permanent striping).
Average Daily Workforce
• Typical utility construction days: 20–27 personnel onsite • Vault installation and paving days: 30–36 personnel onsite • Final striping days: 11 personnel onsite
• Peak workforce: 36 personnel during roadway restoration and paving operations Activity Breakdown by Duration
Activity Type Days Active Typical Workforce Major Equipment / Vendors Utility Potholing & Conflict
Investigation 7 Days 21–27 Personnel TRUVAC HXX Hydro Vac Trucks, Excavators Saw cutting & Asphalt
Milling 7 Days 21–27 Personnel Wirtgen W 210 Fi, Connor Concrete Trench & Vault Excavation 18 Days 20–27 Personnel (2) Komatsu PC360LC Excavators, Dump Trucks
Soil Export & Hauling 18 Days 20–27 Personnel Raymond Trucking Super Ten Dump Trucks
Mainline Conduit
Installation 12 Days 14–25 Personnel Excavators, Wheel Loaders Utility Vault Installation 2 Days 19–25 Personnel Jensen Precast, Hill Crane Crane Operations 2 Days 19–25 Personnel Link-Belt 120RT Crane Slurry Backfill Operations 9 Days 20–25 Personnel Robertsons Ready Mix Aggregate Base Installation 3 Days 30–36 Personnel Vulcan Materials, Raincross Paving
Asphalt Paving &
Restoration 5 Days 30–36 Personnel AP655F Paver, Rollers, Raincross Paving Temporary Striping 1 Day Included in Paving
Operations Raincross Paving
Final Striping & Pavement
Markings 2 Days 11 Personnel PCI Striping, Graco LineLazer Equipment Traffic Control Operations 33 Active
Construction Days
2 Traffic Control
Workers Daily Roadway Traffic Control
Detailed Daily Work DescripƟon1
Day 1 Work DescripƟon – ConstrucƟon Area 1; 9:00AM – 9:00PM BALI will be performing the sawcut, asphalt grinding and recession of steel trench plates as well as potholing and trench excavaƟon.
Asphalt removal will total approximately 85 CY of asphalt.
Potholing will begin at the vault locaƟons, per SCE requirements, and progress to the trench line once vault locaƟons have been cleared of any conflicts.
Trench excavaƟon will begin and total export of the first 430 LF will total approximately 650 CY. Not all excavaƟon will occur on Day 1.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – (2) Traffic Control Laborers • Material Suppliers
o Saf-T-Co - SCE Conduit Delivery
o Trench Shoring - Steel Plate and Shoring Delivery
Day 2 Work DescripƟon – ConstrucƟon Area 1; 9:00AM – 9:00PM BALI will begin excavaƟon of the West Vault locaƟon on S. Santa Monica Blvd and conƟnue trench excavaƟon.
Vault excavaƟon export will total approximately 450 CY.
Trench excavaƟon will conƟnue, but total export is included in Day 1.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. 1 From S. Laskey Drive westward along South Santa Monica Boulevard and Charleville Boulevard, all sawcuƫng, asphalt milling, loaded truck operaƟons, hydro-excavaƟon, and paving will be performed exclusively during the City’s permiƩed construcƟon hours (8:00 a.m. to 6:00 p.m., excluding weekends and public holidays). AddiƟonally, all construcƟon work associated with the vent line installaƟon on Days 11 and 12 will be performed within the city’s permiƩed construcƟon hours and will cease by 6:00 PM. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Roadway Traffic Control – (2) Traffic Control Laborers o Nova – (1) Soils Inspector
• Material Suppliers
o Trench Shoring – Manhole Shoring Box Delivery
Day 3 Work DescripƟon – ConstrucƟon Area 1; 9:00AM – 9:00PM BALI will install and slurry backfill the West Vault and install mainline conduit.
West Vault slurry backfill to total approximately 50 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Jensen Precast
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (3) – Hill Crane
o (25) - TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Link-Belt 120 RT Hydraulic Crane
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – (1) Soils Inspector
o Hill Crane – (3) Crane Operator and Riggers
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Jensen Precast – SCE Vault Delivery
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 4 Work DescripƟon – ConstrucƟon Area 1; 9:00AM – 9:00PM BALI will slurry backfill the mainline conduit and removing the West Vault shoring from the work zone.
Slurry backfill import will total approximately 450 CY. This does not includes Crushed Miscellaneous Base or Asphalt.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Robertsons Ready Mix
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill o Trench Shoring – Manhole Shoring Box Pickup
Day 5 Work DescripƟon – ConstrucƟon Area 2; 9:00AM – 9:00PM BALI will begin with East Vault excavaƟon, excavaƟon of east mainline conduit, sawcuƫng and asphalt grinding of west mainline conduit, excavaƟon of west mainline conduit and the installaƟon of recessed steel trench plates.
Trench excavaƟon includes approximately 110 LF to conƟnue westbound on S. Santa Monica and approximately 255 LF eastbound on S. Santa Monica.
Asphalt removal will total approximately 75 CY.
Vault excavaƟon export will total approximately 450 CY.
Trench excavaƟon will total approximately 550 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (4) – Connor Concrete
o (2) – Roadway
o (24) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Nova – (1) Soils Inspector
o Connor Concrete – (4) Concrete Cuƫng and Asphalt Grinding o Roadway Traffic Control – (2) TC Laborers
Day 6 Work DescripƟon – ConstrucƟon Area 2; 9:00AM – 9:00PM BALI will be performing the installaƟon of the East Vault and mainline conduits on the east and west sides of S. Santa Monica, west of Wilshire.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Jensen Precast
o (2) – Roadway
o (3) – Hill Crane
o (19) - TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Link-Belt 120 RT Hydraulic Crane
• Subcontractors
o Nova – (1) Soils Inspector
o Hill Crane – (3) Crane Operator and Riggers
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Jensen Precast – SCE Vault Delivery
Day 7 Work DescripƟon – ConstrucƟon Area 2; 9:00AM – 9:00PM BALI will be performing the slurry backfill and shoring removal of the East Vault as well as the installaƟon of west and east mainline conduit.
East Vault slurry backfill to total approximately 50 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill o Trench Shoring – Manhole Shoring Box Pickup
Day 8 Work DescripƟon – ConstrucƟon Area 2; 9:00AM – 9:00PM BALI will be performing slurry backfill of the west and east mainline conduit trenches.
Slurry to total approximately 450 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 9 Work DescripƟon – ConstrucƟon Area 3; 9:00AM – 9:00PM BALI will be performing the potholing, sawcuƫng and asphalt grinding for the East Vault vent lines. BALI will also perform the excavaƟon of the vent lines.
Asphalt removal to total approximately 6 CY.
Trench excavaƟon export to total approximately 65 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (4) – Raymond Trucking
o (2) – Roadway
o (21) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Roadway Traffic Control – (2) Traffic Control Laborers Day 10 Work DescripƟon – ConstrucƟon Area 3; 9:00AM – 9:00PM BALI will perform the installaƟon and slurry backfill of the vent lines.
Slurry backfill import to total approximately 55 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 11 Work DescripƟon – ConstrucƟon Area 4; 9:00AM – 9:00PM* BALI will perform the potholing of the West Vault vent lines, including the sawcut, asphalt grinding and excavaƟon of the vent lines.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. *All construcƟon work associated with vent line installaƟon to cease by 6:00PM • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - (2) Sawcut Equipment with Operators o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – (2) TC Laborers
Day 12 Work DescripƟon – ConstrucƟon Area 4; 9:00AM – 9:00PM* BALI will perform the installaƟon and backfill of the vent line conduits.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. *All construcƟon work associated with vent line installaƟon to cease by 6:00PM • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 13 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform the potholing, sawcuƫng and asphalt grinding of the mainline conduit on the north end of Charleville Blvd.
Asphalt export to total approximately 15 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut Equipment with Operators
o Raymond Trucking - Super Ten Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – Traffic Control Laborers
Day 14 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform the excavaƟon of the mainline conduit on the north end of Charleville Blvd.
ExcavaƟon export to total approximately 150 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (2) – Roadway
o (19) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut Equipment with Operators
o Raymond Trucking - Super Ten Dump Truck with Operators o Roadway Traffic Control – Traffic Control Laborers
Day 15 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will conƟnue to perform the excavaƟon of the mainline conduit on the north end of Charleville Blvd.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (2) – Roadway
o (1) – Nova InspecƟon
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut Equipment with Operators
o Raymond Trucking - Super Ten Dump Truck with Operators o Roadway Traffic Control – Traffic Control Laborers
o Nova – Soils InspecƟon
Day 16 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform the installaƟon of mainline conduit on the north end of Charleville Blvd.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (2) – Roadway
o (1) – Nova InspecƟon
o (14) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
• Subcontractors
o Roadway Traffic Control – Traffic Control Laborers
o Nova – Soils InspecƟon
Day 17 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform the slurry backfill of the excavaƟon on the north end of Charleville Blvd.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Mack Granite 64BR Ready-Mix Concrete Transit Mixer Truck • Subcontractors
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 18 Work DescripƟon – ConstrucƟon Areas 1-5; 9:00AM – 9:00PM BALI will install the Crushed Miscellaneous Base and Asphalt beginning with ConstrucƟon Area 1 of the Traffic Control Plans and advancing traffic control throughout the shiŌ as secƟons are completed.
Crushed Miscellaneous Base to total approximately 68 CY.
Asphalt to total approximately 180 CY.
Recessed steel plates to be installed at the end of every shiŌ, where base and asphalt was not completed, to allow for vehicular traffic.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Vulcan
o (6) – Blue Diamond
o (10) – Raincross Paving
o (36) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
(1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Vulcan – Aggregate Base Material
o Blue Diamond – Asphalt
Day 19 Work DescripƟon – ConstrucƟon Areas 1-5; 9:00AM – 9:00PM BALI will install the Crushed Miscellaneous Base and Asphalt compleƟng the ConstrucƟon Areas west of Wilshire.
Temporary striping will be installed at the end of the shiŌ to allow for the 5-day cure Ɵme before final striping is applied.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Vulcan
o (6) – Blue Diamond
o (10) – Raincross Paving
o (36) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Vulcan – Aggregate Base Material
o Blue Diamond – Asphalt
Day 20 Work DescripƟon – ConstrucƟon Area 6; 9:00PM – 6:00AM BALI will perform the potholing, sawcuƫng, asphalt grinding and excavaƟon of the Wilshire crossing.
Asphalt export to total 14 CY.
Trench excavaƟon export to total 85 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – (2) Traffic Control Laborers Day 21 Work DescripƟon – ConstrucƟon Area 6; 9:00PM – 6:00AM BALI will perform the excavaƟon and installaƟon of the mainline conduit.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Roadway Traffic Control – (2) Traffic Control Laborers o Nova – (1) Soils Inspector
Day 22 Work DescripƟon – ConstrucƟon Area 6; 9:00PM – 6:00AM BALI will perform conduit installaƟon and slurry backfill of the mainline conduit.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
• BALI Equipment
o (2) F550 UƟlity Truck
o (2) 80k Excavator
• Subcontractors
o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Nova – (1) Soils Inspector
o Roadway Traffic Control – (2) TC Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 23 Work DescripƟon – ConstrucƟon Area 7; 9:00PM – 6:00AM BALI will perform potholing, sawcuƫng, asphalt grinding and excavaƟon in the middle secƟon of the Wilshire crossing.
Asphalt export to total approximately 10 CY.
Trench excavaƟon export to total approximately 60 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (saw cuƫng and asphalt milling) o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – (2) Traffic Control Laborers Day 24 Work DescripƟon – ConstrucƟon Area 7; 9:00PM – 6:00AM BALI will perform the excavaƟon and installaƟon of the mainline conduit.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - (6) Super 10 Dump Truck with Operators o Roadway Traffic Control – (2) Traffic Control Laborers o Nova – (1) Soils Inspector
Day 25 Work DescripƟon – ConstrucƟon Area 7; 9:00PM – 6:00AM BALI will perform the installaƟon and slurry backfill of the mainline conduit.
Slurry backfill import to total approximately 55 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
• BALI Equipment
o (2) F550 UƟlity Truck
o (2) 80k Excavator
• Subcontractors
o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Nova – (1) Soils Inspector
o Roadway Traffic Control – (2) TC Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 26 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI will perform the potholing, sawcuƫng, asphalt grinding and excavaƟon for the mainline conduit.
Asphalt export to total approximately 10 CY.
Trench excavaƟon export to total approximately 60 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (4) – Connor Concrete (sawcuƫng and asphalt milling)
o (6) – Raymond Trucking
o (4) – Norcal
o (2) – Roadway
o (27) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (1) Wirtgen W 210 FI (asphalt milling)
o (2-3) TRUVAC HXX Hydro ExcavaƟon
o (6) Super 10 Dump Truck
• Subcontractors
o Connor Concrete - Sawcut and Asphalt Milling Equipment with Operators o Raymond Trucking - Super 10 Dump Truck with Operators o Norcal – Hydro Vacuum ExcavaƟon Truck with Operators
o Roadway Traffic Control – Traffic Control Laborers
Day 27 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI will perform the excavaƟon and installaƟon of the mainline conduit.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (2) – Roadway
o (20) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Komatsu PC360-LC Hydraulic Excavator
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
• Subcontractors
o Raymond Trucking - Super 10 Dump Truck with Operators o Roadway Traffic Control – Traffic Control Laborers
o Nova – Soils Inspector
Day 28 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI will perform the installaƟon and slurry backfill of mainline conduit.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – Foreman, Operators, Laborers
o (6) – Raymond Trucking
o (1) – Nova InspecƟon
o (6) – Robertsons Ready Mix
o (2) – Roadway
• BALI Equipment
o (2) F550 UƟlity Truck
o (2) 80k Excavator
• Subcontractors
o Raymond Trucking - (6) Super Ten Dump Truck with Operators o Nova – (1) Soils Inspector
o Roadway Traffic Control – (2) TC Laborers
• Material Suppliers
o Robertsons Ready Mix – Concrete Trucks Slurry Backfill Day 29 Work DescripƟon – ConstrucƟon Area 5; 9:00AM – 9:00PM BALI will perform Crushed Miscellaneous Base installaƟon on secƟons of the Traffic Control plan that had not been previously completed, specifically ConstrucƟon Area 5.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Vulcan
o (6) – Blue Diamond
o (10) – Raincross Paving
o (36) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Vulcan – Aggregate Base Material
o Blue Diamond – Asphalt
Day 30 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI will perform Crushed Miscellaneous Base installaƟon on secƟons of the Traffic Control plan that had not been previously completed.
Crushed Miscellaneous Base import to total approximately 5 CY.
Recessed steel plates to be installed at the end of every shiŌ to allow for vehicular traffic. • Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Vulcan
o (10) – Raincross Paving
o (30) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Vulcan – Aggregate Base Material
Day 31 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI to asphalt pave the secƟons through the Wilshire crossing.
Asphalt import to total approximately 20 CY for Wilshire crossing.
Recessed steel plates to be installed at the end of every shiŌ, where asphalt was not completed, to allow for vehicular traffic.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Blue Diamond
o (10) – Raincross Paving
o (30) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Blue Diamond – Asphalt
Day 32 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI to asphalt pave the secƟons through the Wilshire crossing.
Recessed steel plates to be installed at the end of every shiŌ, where asphalt was not completed, to allow for vehicular traffic.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Blue Diamond
o (10) – Raincross Paving
o (30) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Blue Diamond – Asphalt
Day 33 Work DescripƟon – ConstrucƟon Area 8; 9:00PM – 6:00AM BALI to asphalt pave the secƟons through the Wilshire crossing.
Recessed steel plates to be installed at the end of every shiŌ, where asphalt was not completed, to allow for vehicular traffic.
• Crew Members
o (11) – BALI – Foreman, Operators, Laborers
o (1) – Nova InspecƟon
o (2) – Roadway
o (6) – Blue Diamond
o (10) – Raincross Paving
o (30) – TOTAL
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (1) Caterpillar AP655F Asphalt Paver
o (1) Bomag BW 900-50 Roller
o (1) Elgin Pelican Street Sweeper
o (1) Caterpillar 272D3 Skid Steer
o (1-2) Caterpillar 924H Wheel Loader
o (6) Super 10 Dump Truck
o (1) Kenworth T800 Water Truck
• Subcontractors
o Raincross Paving – Paving Contractor
o Nova – Soils Inspector
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
o Blue Diamond – Asphalt
Day 38 Work DescripƟon – ConstrucƟon Areas 1-8; 9:00PM – 6:00AM BALI to perform final striping for ConstrucƟon Areas 1 through 8. • Crew Members
o (5) – Foreman, Operators, Laborers
o (2) – Roadway
o (4) – PCI
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Graco LineLazer V 5900
• Subcontractors
o PCI – Pavement Markings and Lane Striping
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
Day 39 Work DescripƟon – ConstrucƟon Areas 1-8; 9:00PM – 6:00AM BALI to perform final striping for ConstrucƟon Areas 1 through 8. • Crew Members
o (5) – Foreman, Operators, Laborers
o (2) – Roadway
o (4) – PCI
• BALI Equipment
o (2) Ford F550 UƟlity Truck
o (2) Graco LineLazer V 5900
• Subcontractors
o PCI – Pavement Markings and Lane Striping
o Roadway Traffic Control – Traffic Control Laborers
• Material Suppliers
Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
EXHIBIT 3
Air Quality and Greenhouse Gas Impact Analysis for the One Beverly Hills Project – Underground Electrical Infrastructure Extension
(Prepared by LSA, dated August 6, 2026)
CARLSBAD
CLOVIS
EMERYVILLE
IRVINE
LOS ANGELES
PALM SPRINGS
RIVERSIDE
ROSEVILLE
SAN LUIS OBISPO
2565 Alluvial Avenue, Suite 112, Clovis, California 93611 559.490.1210 www.lsa.net
MEMORANDUM
DATE: August 6, 2026
TO: Brittany Knott, Cain Development, LP
FROM: Alyssa Barnett, Senior Air Quality Specialist
Cara Cunningham, Associate
SUBJECT: Air Quality and Greenhouse Gas Impact Analysis for the One Beverly Hills Project – Underground Electrical Infrastructure Extension (LSA Project No. 20263059)
INTRODUCTION
The One Beverly Hills Overlay Specific Plan Project (project) was evaluated by the City of Beverly Hills in the One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report (SEIR). 1 This Air Quality and Greenhouse Gas (GHG) Technical Memorandum evaluates whether construction of off-site underground electrical infrastructure improvements would alter the air quality and GHG impact conclusions presented in the SEIR. This analysis was prepared using methods and assumptions recommended in the air quality impact assessment guidelines of the South Coast Air Quality Management District (SCAQMD) in its CEQA Air Quality Handbook (1993)2 and associated updates.
PROJECT LOCATION
The off-site improvement area is located within the existing public roadway right-of-way on South Santa Monica Boulevard, from Charleville Boulevard to approximately 20 linear feet east of the Wilshire Boulevard intersection in Beverly Hills, California. Figure 1 shows the off-site improvement location (all figures are provided in Attachment A).
PROJECT DESCRIPTION
The proposed off-site improvement project consists of extension of the underground electrical infrastructure within existing public roadway rights-of-way, including the construction of underground conduit systems, utility vaults, vent lines, and associated street restoration 1 City of Beverly Hills. 2021. One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report. 2 South Coast Air Quality Management District (SCAQMD). 1993. CEQA Air Quality Handbook (currently under revision). Website: http://www.aqmd.gov/home/rules-compliance/ceqa/air-quality-analysishandbook/ceqa-air-quality-handbook-(1993) (accessed August 2026).
LSA
50 . .
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 2 improvements. Construction activities would occur primarily along South Santa Monica Boulevard, the Wilshire Boulevard crossing, and Charleville Boulevard. Figure 2 shows the off-site improvement construction boundary.
The work would be completed over an approximately 39-day construction period and would occur entirely within previously disturbed urban roadway corridors. Major construction activities include utility potholing, saw cutting, asphalt milling and removal, trench excavation, installation of underground electrical conduits, construction and placement of precast electrical vaults, installation of vent line conduits, slurry backfilling, aggregate base placement, asphalt pavement restoration, and final pavement striping. Temporary traffic control measures would be implemented throughout construction, with steel trench plates installed at the end of each workday to maintain vehicular access where excavations remain open.
Construction would begin with utility potholing and conflict identification using hydro-vacuum excavation equipment, followed by saw cutting and asphalt milling of existing pavement surfaces.
Excavation activities would include the removal of approximately 2,500 cubic yards of trench material and approximately 215 cubic yards of asphalt pavement. Excavations would support the installation of approximately 795 linear feet of mainline electrical conduit within South Santa Monica Boulevard, associated vent line conduits, and two underground electrical vault structures.
Approximately, 50 linear feet of conduit would be installed in Charleville Boulevard north of South Santa Monica Boulevard.
Vault construction would include excavation, shoring installation, placement of precast concrete vaults using hydraulic cranes, conduit connections, and slurry backfill. Mainline conduit installation would occur in multiple segments along South Santa Monica Boulevard, Charleville Boulevard, and the Wilshire Boulevard crossing. Vent line conduit installations would be constructed adjacent to both vault locations.
Backfill operations would consist primarily of controlled low-strength material (CLSM) slurry placement, totaling approximately 1,100 cubic yards. Following utility installation, trench sections would be restored using crushed miscellaneous base and asphalt pavement. Approximately 68 cubic yards of aggregate base and 200 cubic yards of asphalt paving material would be imported and placed during roadway restoration. Temporary pavement markings would be installed following paving operations, with final lane striping completed after the required asphalt curing period.
Construction would require crews ranging from approximately 14 to 36 personnel per day, depending on the phase of work. Equipment anticipated during various phases of construction includes hydraulic excavators, wheel loaders, hydro-vacuum excavation trucks, asphalt milling machines, dump trucks, concrete mixer trucks, cranes, asphalt paving equipment, rollers, sweepers, water trucks, and pavement striping equipment.
Temporary impacts associated with construction may include traffic lane closures and detours, construction-generated fugitive dust emissions, equipment exhaust emissions, temporary disruption of roadway circulation, hauling of excavated materials, delivery of construction materials, and shortterm visual effects associated with construction equipment and traffic control devices. Construction activities would occur within developed urban transportation corridors and would not introduce new LSA
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 3 permanent above-ground structures beyond the standard utility access features associated with underground electrical facilities.
Upon completion, the off-site improvements would provide upgraded underground electrical infrastructure intended to improve utility reliability and service capacity.
EXISTING SENSITIVE RECEPTORS IN THE PROJECT AREA
Sensitive receptors are defined as populations that are particularly susceptible to health effects due to exposure to an air contaminant, including schools, playgrounds, childcare centers, long-term healthcare facilities, rehabilitation centers, convalescent centers, hospitals, retirement homes, and residences.3
The off-site improvement area is bounded mostly by commercial land use north and south of the project site perimeter; and residential land use at the corner of South Santa Monica Boulevard and Charleville Boulevard (Rosewood Residences) and northwest of the project site, across North Santa Monica Boulevard and southeast of the project site. Since the off-site utility improvements extend approximately 795 linear feet, the nearest sensitive receptor varies throughout the construction corridor. Adjacentsensitive receptorsinclude the Rosewood Residences as well as nearby residential uses. The Rosewood Residence is the closest sensitive receptor, located approximately 46.6 feet (14.1 meters) from the nearest construction activities. Additional residential uses are located adjacent to other portions of the construction at greater distances.
ENVIRONMENTAL SETTING
This section provides background information on air quality and GHG emissions.
Air Quality
Air quality is primarily a function of local climate, local sources of air pollution, and regional pollution transport. The amount of a given pollutant in the atmosphere is determined by the amount of the pollutant released and the atmosphere’s ability to transport and dilute the pollutant. The major determinants of transport and dilution are wind, atmospheric stability, terrain, and, for photochemical pollutants, sunshine.
A region’s topographic features have a direct correlation with air pollution flow and therefore are used to determine the boundary of air basins. The proposed project is in Los Angeles County and within the South Coast Air Basin (Basin), and it is therefore subject to the jurisdiction of, and regulations promulgated by, the SCAQMD.
The Basin comprises approximately 10,000 square miles and covers all of Orange County and the urban parts of Los Angeles, Riverside, and San Bernardino counties. The Basin is on a coastal plain 3 SCAQMD. 2005. Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning.
May. Website: http://www.aqmd.gov/docs/default-source/planning/air-quality-guidance/completeguidance-document.pdf?sfvrsn=4 (accessed August 2026).
LSA
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 4 with connecting broad valleys and low hills to the east. Regionally, the Basin is bounded by the Pacific Ocean to the southwest and high mountains to the east, forming the inland perimeter.
Both the State and federal governments have established health-based ambient air quality standards for criteria air pollutants: carbon monoxide (CO), ozone (O3), nitrogen dioxide (NO2), sulfur dioxide (SO2), lead, and suspended particulate matter. In addition, the State has set standards for sulfates, hydrogen sulfide, vinyl chloride, and visibility-reducing particles. These standards are designed to protect the health and welfare of the populace with a reasonable margin of safety. Two criteria pollutants, O3 and NO2, are considered regional pollutants because they (or their precursors) affect air quality on a regional scale. Pollutants such as CO, SO2, and lead are considered local pollutants that tend to accumulate in the air locally.
Data collected at permanent monitoring stations are used by the United States Environmental Protection Agency (USEPA) to identify regions as attainment or nonattainment depending on whether the regions meet the requirements stated in the applicable National Ambient Air Quality Standards (NAAQS). At the state level, the California Air Resources Board (CARB) is required to designate areas of the State as attainment, nonattainment, or unclassified for all State standards.
The Basin is designated as nonattainment for the federal standards for O3 and particulate matter less than 2.5 microns in diameter (PM2.5) and nonattainment for the State standards for O3, particulate matter less than 10 microns in diameter (PM10), and PM2.5.
Greenhouse Gases
GHGs are present in the atmosphere naturally, are released by natural sources, or form from secondary reactions taking place in the atmosphere. Over the last 200 years, humans have caused substantial quantities of GHGs to be released into the atmosphere. These extra emissions are increasing GHG concentrations in the atmosphere and enhancing the natural greenhouse effect, which is believed to be causing global warming. Although manmade GHGs include naturally occurring GHGs (e.g., carbon dioxide [CO2], methane [CH4], and nitrous oxide [N2O]), some gases (e.g., hydrofluorocarbons [HFCs], perfluorocarbons [PFCs], nitrogen trifluoride [NF3], and sulfur hexafluoride [SF6]) are completely new to the atmosphere.
Certain gases (e.g., water vapor) are short-lived in the atmosphere. Others remain in the atmosphere for significant periods of time, contributing to climate change in the long term. Water vapor is excluded from the list of GHGs above because it is short-lived in the atmosphere and its atmospheric concentrations are largely determined by natural processes (e.g., oceanic evaporation).
These gases vary considerably in terms of global warming potential (GWP), which is a concept developed to compare the ability of each GHG to trap heat in the atmosphere relative to another gas. The GWP is based on several factors, including the relative effectiveness of a gas in absorbing infrared radiation and the length of time that the gas remains in the atmosphere (i.e., atmospheric lifetime). The GWP of each gas is measured relative to CO2, the most abundant GHG; the definition of GWP for a particular GHG is the ratio of heat trapped by one unit mass of the GHG to the ratio of heat trapped by one unit mass of CO2 over a specified time period. GHG emissions are typically measured in terms of pounds or tons of CO2 equivalents (CO2e).
LSA
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 5
SUMMARY OF SEIR FINDINGS
As noted previously, an SEIR (State Clearinghouse No. 2020090048) was prepared for the One Beverly Hills Overlay Specific Plan Project and was certified by the City in 2021. The findings from the air quality and GHG analysis in the SEIR, specifically as they relate to construction impacts, are summarized below.
Air Quality
The SEIR found that construction activities related to buildout of the One Beverly Hills Overlay Specific Plan Project would generate emissions exceeding the SCAQMD regional threshold for maximum daily NOX emissions, resulting in a cumulatively considerable net increase of NOX and exposure of sensitive receptors to substantial pollutant concentrations. The SEIR found that construction-related impacts would be significant, and implementation of Mitigation Measures (MMs) AQ-1 through MM-AQ-17 would be required to reduce impacts to a less than significant level.
A list of these measures can be found in Attachment B of this memorandum.
Greenhouse Gas
The SEIR concluded that the construction GHG emissions from buildout of the One Beverly Hills Overlay Specific Plan Project would be less than significant and did not require GHG mitigation measures.
METHODOLOGY
This memorandum quantifies construction-related criteria pollutant and GHG emissions associated with the installation of the underground electrical infrastructure. The addition of the off-site improvement project would not result in new operational land uses, building energy use, area sources, or other ongoing emission sources. Accordingly, operational emissions are not evaluated in this analysis.
The California Emissions Estimator Model (CalEEMod) Version 2022.1 computer program was used to calculate emissions from construction of the off-site improvement project. CalEEMod is a statewide land use emissions web model designed to provide a uniform platform for government agencies, land use planners, and environmental professionals to quantify potential criteria pollutants and GHGs associated with both construction and operation of a variety of land use projects. The model quantifies direct emissions from construction and operations (including vehicle use), as well as indirect emissions, such as GHG emissions from energy use, solid waste disposal, vegetation planting and/or removal, and water use for land use developments and linear projects. Default data (emission factors, trip lengths, meteorology, source inventory, etc.) have been provided by the various California air districts to account for local requirements and conditions.
Construction of the proposed off-site improvements would include utility potholing, saw cutting, asphalt milling and removal, trench excavation, conduit and precast vault installation, slurry backfill, aggregate base placement, asphalt restoration, pavement striping, and associated site restoration.
Construction is anticipated to occur over approximately 39 working days. Construction activities LSA
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 6 would generally include both daytime and nighttime work, with work progressing by construction segment in accordance with the off-site improvement project’s Traffic Control Plan (TCP).
The TCP divides construction into eight planning areas, each representing a separate work area with unique construction activities, equipment requirements, workforce, and material handling assumptions. Rather than modeling off-site improvements as a single construction phase, each planning area was modeled separately in CalEEMod to reflect the phased nature of the proposed improvements and the varying daily construction activities.
The off-site improvements were modeled using the Linear Road Construction land use category.
Construction assumptions were developed using applicant-provided information, which identifies the anticipated daily construction activities, equipment, workforce, and material handling requirements for each construction segment. Specific construction equipment includes excavators, rubber-tired loaders, hydro-vac trucks, cranes, skid steers, asphalt milling equipment, paving equipment, rollers, striping equipment, and sweepers. A list of the modeled construction fleet is available in Attachment C.
Construction would require the export of approximately 2,500 cubic yards of excavated trench material and 215 cubic yards of asphalt pavement for export. Approximately 1,100 cubic yards of CLSM would be imported for trench backfill, along with approximately 68 cubic yards of aggregate base and 200 cubic yards of asphalt paving material. A 20-mile one-way haul distance was conservatively assumed for the transport of exported and imported materials. This analysis assumes the use of Average Tier construction equipment and that the proposed off-site improvements would comply with SCAQMD dust control regulations (Rule 403).
Since certain construction activities and equipment are not explicitly represented in CalEEMod, specific construction activities and equipment were translated into the most representative CalEEMod construction phases and equipment categories. Similarly, the workforce, vendor deliveries, material hauling quantities, and construction schedule were incorporated into the model to reasonably represent the anticipated construction activities. CalEEMod output data are included in Attachment C.
THRESHOLDS OF SIGNIFICANCE
Air Quality Thresholds
The State CEQA Guidelines indicate that a project would normally have a significant adverse air quality impact if project-generated pollutant emissions would do any of the following:
• Conflict with or obstruct implementation of the applicable air quality plan; • Result in a cumulatively considerable net increase of any criteria pollutant for which the project is nonattainment under applicable federal or State ambient air quality standards; • Expose sensitive receptors to substantial pollutant concentrations; or • Result in other emissions (such as those leading to odors) affecting a substantial number of people.
LSA
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 7 Certain air districts (e.g., SCAQMD) have created guidelines and requirements to conduct air quality analysis. The SCAQMD’s current guidelines, the CEQA Air Quality Handbook4 with associated updates, were followed in this assessment of air quality impacts for the proposed project.
Regional Criteria Pollutant Thresholds
SCAQMD has established daily emission thresholds for construction of proposed projects. The emission thresholds were established based on the attainment status of the air basins within the SCAQMD with regard to air quality standards for specific criteria pollutants. Because the concentration standards were set at a level that protects public health with an adequate margin of safety, these emission thresholds are regarded as conservative and would overstate an individual project’s contribution to health risks. Table A lists the CEQA significance thresholds for construction emissions established for the SCAQMD.
Table A: Regional Significance Thresholds for Construction Emissions Emissions Source Pollutant Emissions Threshold (lbs/day) VOCs NOX CO PM10 PM2.5 SOX
Construction 75 100 550 150 55 150
Source: SCAQMD. 2023. Air Quality Significance Thresholds. Website: https://www.aqmd.gov/docs/defaultsource/ceqa/handbook/south-coast-aqmd-air-quality-significance-thresholds.pdf?sfvrsn=25 (accessed July 2026).
CO = carbon monoxide
lbs/day = pounds per day
NOX = nitrogen oxides
PM10 = particulate matter less than 10 microns in size
PM2.5 = particulate matter less than 2.5 microns in size SCAQMD = South Coast Air Quality Management District
SOX = sulfur oxides
VOCs = volatile organic compounds
Projects in the Basin with construction-related emissions that exceed any of their respective emission thresholds would be considered significant under SCAQMD guidelines. These thresholds, which SCAQMD developed and that apply throughout the Basin, apply as both project and cumulative thresholds. If a project exceeds these standards, it is considered to have a project-specific and cumulative impact.
Because of the conservative nature of the thresholds and the basin-wide context of individual project emissions, there is no known direct correlation between a single project and localized air quality-related health effects. One individual project that generates emissions exceeding a threshold does not necessarily result in adverse health effects for residents in the project vicinity. This condition is especially true when the criteria pollutants exceeding thresholds are those with regional effects, such as ozone precursors like nitrogen oxides (NOX) and volatile organic compounds (VOCs).
Further, by its very nature, air pollution is largely a cumulative impact. No single project is sufficient in size to, by itself, result in nonattainment of ambient air quality standards. Instead, a project’s individual emissions contribute to existing cumulatively significant adverse air quality impacts. If a project’s contribution to the cumulative impact is considerable, then the project’s impact on air 4 SCAQMD. 1993. CEQA Air Quality Handbook (currently under revision). Website: http://www.aqmd.gov/ home/rules-compliance/ceqa/air-quality-analysis-handbook/ceqa-air-quality-handbook-(1993) (accessed August 2026).
LSA
I I I I I
I I I I I
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 8 quality would be considered significant. In developing thresholds of significance for air pollutants, the air districts have considered the emission levels for which a project’s individual emissions would be cumulatively considerable. If a project exceeds the identified significance thresholds, its emissions would be cumulatively considerable, resulting in significant adverse air quality impacts to the region’s existing air quality conditions.
Localized Criteria Pollutant Thresholds
The SCAQMD published its Final Localized Significance Threshold Methodology in July 2008, recommending that all air quality analyses include an assessment of air quality impacts to nearby sensitive receptors.5 This guidance was used to analyze potential localized air quality impacts associated with construction of the proposed project. Localized significance thresholds (LSTs) are developed based on the size or total area of the emission source, the ambient air quality in the Source Receptor Area (SRA), and the distance to the project. Sensitive receptors include residences, schools, hospitals, and similar uses that are sensitive to adverse air quality.
LSTs are based on the ambient concentrations of that pollutant within the project’s SRA and the distance to the nearest sensitive receptor. For the proposed project, the appropriate SRA for the LST is the Northwest Coastal Los Angeles County area (SRA 2).
As previously stated, the nearest sensitive receptor varies depending on the active construction area.
The Residences at the corner of Charleville Boulevard and South Santa Monica Boulevard represent the closest sensitive receptor, located approximately 46.6 feet (14.1 meters) south of the nearest construction activities. Since the SCAQMD LST screening tables are available for receptor distances of 25, 50, 100, 200, and 500 meters and allow use of the 25-meter screening distance where receptors are located with 25 meters of the emissions source, a 25-meter receptor distance was used for this analysis.
Construction activities were evaluated using the 1-acre disturbance thresholds, consistent with the maximum daily disturbance area associated with each construction segment. It should be noted that the highest localized emissions are anticipated during construction of Area 1, which is also the segment located closest to the nearest sensitive receptor. This construction segment represents the conservative worst-case scenario for the LST analysis. If localized emissions associated with Area 1 are below the applicable SCAQMD LSTs, localized emissions associated with the remaining construction segments, which would generate lower emissions and/or occur farther from nearby sensitive receptors, would also be below the applicable thresholds. Table B lists the emissions thresholds that apply during project construction.
5 SCAQMD. 2008. Final Localized Significance Threshold Methodology. July.
LSA
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 9 Table B: Localized Significance Thresholds for Construction Emissions Emissions Source Pollutant Emissions Threshold (lbs/day) NOX CO PM10 PM2.5
Construction (1-acre, 25-meter distance) 103 562 4.0 3.0 Source: SCAQMD. 2008. Final Localized Significance Threshold Methodology. July; Appendix C – Mass Rate LST Look-up Tables. Website: https://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance-thresholds/ appendix-c-mass-rate-lst-look-up-tables.pdf?sfvrsn=8e641d61_4 (accessed July 2026).
CO = carbon monoxide
lbs/day = pounds per day
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
SCAQMD = South Coast Air Quality Management District
Greenhouse Gas Thresholds
Appendix G of the State CEQA Guidelines includes significance thresholds for GHG emissions. A project would normally have a significant effect on the environment if it would do either of the following:
• Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment
• Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs
To provide guidance to local lead agencies on determining significance for GHG emissions in their CEQA documents, SCAQMD has convened a GHG CEQA Significance Threshold Working Group (Working Group). Based on the last Working Group meeting held in September 2010 (Meeting No. 15), SCAQMD proposed to adopt a tiered approach for evaluating GHG emissions for development projects where SCAQMD is not the lead agency:
• Tier 1—Exemptions: If a project is exempt from CEQA, project-level and cumulative GHG emissions are less than significant.
• Tier 2—Consistency with a Locally Adopted GHG Reduction Plan: If the project complies with a GHG emissions reduction plan or mitigation program that avoids or substantially reduces GHG emissions in the project’s geographic area (i.e., city or county), project-level and cumulative GHG emissions are less than significant.
• Tier 3—Numerical Screening Threshold: If GHG emissions are less than the numerical screeninglevel threshold, project-level and cumulative GHG emissions are less than significant. For nonstationary source land use types, the SCAQMD applies a “bright-line” screening-level threshold of 3,000 MT of CO2e (or MT CO2e) per year (MT CO2e/year) for all land use types. Therefore, projects that do not exceed the bright-line threshold would have a nominal and therefore less than cumulatively considerable impact on GHG emissions. • Tier 4—Performance Standards: If emissions exceed the numerical screening threshold, a more detailed review of the project’s GHG emissions is warranted. The SCAQMD has proposed an efficiency target for projects that exceed the bright-line threshold. The SCAQMD proposed a 2020 efficiency target of 4.8 MT CO2e per year per service population for project-level analyses LSA
I I I
I I I
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 10 and 6.6 MT CO2e per yr per service population for plan-level projects (e.g., program-level projects such as general plans).
Consistent with the SEIR, this analysis evaluates GHG emissions using the SCAQMD-recommended Tier 3 bright-line screening threshold of 3,000 MT CO2e per year and the project-specific efficiency threshold of 3.2 MT CO2e per service population per year. These thresholds were used to evaluate whether GHG emissions associated with the proposed off-site improvements would alter the significance conclusions presented in the SEIR.
IMPACT ANALYSIS
This section identifies potential construction-related air quality and GHG impacts associated with implementation of the proposed off-site improvements.
Air Quality Impacts
Air pollutant emissions associated with the proposed off-site improvements would occur from shortterm construction activities, as described in the following discussion.
Short-Term Construction Emissions
During construction, short-term degradation of air quality may occur due to the release of particulate matter emissions (i.e., fugitive dust) generated by excavation, trenching, grading, pavement removal and replacement, and backfilling activities. Emissions from construction equipment are also anticipated and would include CO, NOX, VOC, directly emitted PM2.5 or PM10, and toxic air contaminants (TACs) such as diesel exhaust particulate matter (DPM).
Construction of the off-site improvements would include excavation, trenching, utility installation, pavement restoration, and associated roadway improvements. Sources of fugitive dust would include disturbed soils at the construction site. The SCAQMD has established Rule 403: Fugitive Dust, which would require the applicant to implement measures that would reduce the amount of particulate matter generated during the construction period.
In addition to dust-related PM10 emissions, heavy trucks and construction equipment powered by gasoline and diesel engines would generate CO, SOX, NOX, VOCs, and some soot particulate (PM2.5 and PM10) in exhaust emissions. If construction activities were to increase traffic congestion in the area, CO and other emissions from traffic would increase slightly while those vehicles idle in traffic.
These emissions would be temporary in nature and limited to the immediate area surrounding the construction site.
Construction emissions were estimated for the off-site improvements using CalEEMod and are summarized in Table C. CalEEMod output sheets are included in Attachment C.
As shown, the construction emissions associated with the proposed off-site improvements are below the applicable SCAQMD regional significance thresholds. The off-site improvements represent an incremental addition to the overall One Beverly Hills project construction emissions. The maximum daily emissions evaluated in the SEIR and presented in Table 10.1-9 include the following: 18 lbs/day LSA
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 11 Table C: Short-Term Regional Construction Emissions from Off-Site Improvements Maximum Daily Emissions (lbs/day)
VOCs NOX CO SOX PM10 PM2.5
Off-Site Improvements - Peak Daily Emissions 4.6 37.3 56.9 0.1 5.8 2.3 SCAQMD Threshold 75.0 100.0 550.0 150.0 150.0 55.0
Significant? No No No No No No
Source: Compiled by LSA (August 2026) and One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report (Rincon Consultants, Inc. 2021).
CO = carbon monoxide
lbs/day = pounds per day
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
SCAQMD = South Coast Air Quality Management District
SEIR = Supplemental Environmental Impact Report
SOX = sulfur oxides
SP = Specific Plan
VOCs = volatile organic compounds
VOCs, 169 lbs/day NOX, 176 lbs/day CO, 1 lb/day SO2, 27 lbs/day PM10 and 9 lbs/day PM2.5. Maximum daily NOX emissions were predominantly generated by the mass grading phase of the project during year two of construction. The maximum daily emissions of NOX substantially reduced in subsequent years of construction. Year two of construction has been completed. Accordingly, given the current phase of constructionthe proposed off-site improvements would not combine with onsite emissions to substantially increase the construction emissions that formed the basis of the SEIR’s air quality conclusions.
In addition, the SEIR identified construction-related air quality impacts associated with emissions of NOX and adopted MM AQ-1 through MM AQ-17 to reduce construction emissions and minimize impacts to nearby sensitive receptors. These measures include requirements related to construction equipment, construction traffic management, fugitive dust control measures, and construction best management practices. The proposed off-site improvements would be subject to applicable construction air quality mitigation measures identified in the SEIR. Accordingly, the proposed off-site improvements do not alter the SEIR’s determination, and mitigation measures identified remain applicable. Therefore, the SEIR’s air quality conclusions remain unchanged.
Localized Impact Analysis
Off-site improvement construction emissions were compared to the LST screening tables in SRA 2, based on a 25-meter source-receptor distance and a disturbed acreage threshold of 1 acre for construction projects. Table D shows the results of the LST analysis during off-site improvement construction.
Table D: Off-Site Improvements Localized Construction Emissions Source Maximum Daily Emissions (lbs/day)
NOX CO PM10 PM2.5
On-Site Emissions 22.8 35.0 1.1 1.0
Localized Significance Threshold 103.0 562.0 4.0 3.0
Significant? No No No No
Source: Compiled by LSA (August 2026).
Note: Source Receptor Area 2, based on a 1.0-acre construction disturbance daily, at a distance of 25 meters from the project boundary to the nearest sensitive receptor.
LSA
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 12 Table D: Off-Site Improvements Localized Construction Emissions Source Maximum Daily Emissions (lbs/day)
NOX CO PM10 PM2.5
CO = carbon monoxide
lbs/day = pounds per day
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
As shown in Table D, localized construction emissions associated with the off-site improvements do not exceed the applicable SCAQMD localized significance thresholds. The LST analysis evaluates the highest-emitting construction activities occurring at the nearest sensitive receptor, representing a conservative worst-case assessment of localized impacts. Construction activities with lower emissions and/or occurring farther from sensitive receptors would result in lower localized pollutant concentrations. Therefore, implementation of the proposed off-site improvements would not result in significance localized impacts.
The proposed off-site improvements would not alter the One Beverly Hills Overlay Specific Plan Project’s consistency with the applicable air quality management plan or result in other air quality impacts beyond those evaluated herein. Additionally, construction of the proposed off-site improvements would result in temporary DPM emissions from diesel-powered construction equipment. As the off-site improvements represent only a minor component of the overall project construction activities and generate lower emissions than those evaluated in the SEIR, they would not result in a substantial increase in TAC impacts or alter the SEIR’s conclusions.
Since construction emissions associated with the off-site improvements are below the regional and localized thresholds of significance and there are no operation-related emission sources, the proposed off-site improvements are not expected to result in significant odor impacts or other air quality effects beyond those addressed in this memorandum.
Greenhouse Gas Impacts
GHG emissions associated with the off-site improvement project would occur from short-term construction activities.
Generation of Greenhouse Gas Emissions
Construction Emissions. Construction activities associated with the proposed off-site improvement would produce combustion emissions from various sources. Construction would emit GHGs through the operation of construction equipment and from worker and builder supply vendor vehicles during the construction period. The combustion of fossil-based fuels creates GHGs such as CO2, CH4, and N2O. Furthermore, the fueling of heavy equipment emits CH4. Exhaust emissions from on-site construction activities would vary daily as construction activity levels change.
As indicated above, the SCAQMD does not have an adopted threshold of significance for construction-related GHG emissions. However, it is best practice for lead agencies to quantify and disclose GHG emissions that would occur during construction. The SCAQMD recommends the construction GHG emissions to be amortized over the life of the project (which is defined as 30 years), added to the operational emissions, and compared to the applicable interim GHG LSA
8/6/26 «P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx» 13 significance threshold tier. Table E summarizes the estimated construction GHG emissions associated with the proposed off-site improvements.
Table E: Construction Greenhouse Gas Emissions from Off-Site Improvements Greenhouse Gas Emissions,
MT CO2e/yr
SEIR GHG Amortized Emissions from Buildout of Entire SP 587.3 Total Construction GHG Emissions from Off-Site Improvements 84.1 Amortized GHG Emissions from Off-Site Improvements 2.8
SEIR Total GHG Emissions 2,564.8
SEIR Total GHG Emissions + Amortized GHG Emissions from Off-Site Improvements 2,567.6 SCAQMD Recommended Bright-Line Threshold 3,000.0
Significant? No
Source: Compiled by LSA (August 2026) and One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report (Rincon Consultants, Inc. 2021).
MT CO2e/yr = metric tons of carbon dioxide equivalent per year SEIR = Supplemental Environmental Impact Report
SP = Specific Plan
As shown in Table E, construction of the proposed off-site improvements would generate approximately 84.1 MT CO2e during construction. When amortized over a 30-year project life, construction GHG emissions of the proposed off-site improvements would equal approximately 2.8 MT CO2 per year, a fraction of the overall construction emissions. When combined with the SEIR emissions of the full project, the overall GHG emissions would still be below the threshold.
The SEIR concluded that project-related GHG emissions would be less than significant and did not require GHG mitigation measures. Rather, the EIR identifies numerous sustainability features, including commitments to achieve LEED and WELL certification, as well as energy- and waterefficient building design features that reduce long-term operational energy use and GHG emissions.
The proposed off-site improvements would not modify these sustainability features. As such the GHG conclusions presented in the SEIR remain applicable to the proposed off-site improvements.
CONCLUSION
Based on the analysis presented above, the proposed off-site improvements would not result in a substantial increase in the severity of air quality or GHG emissions impacts as compared to those disclosed in the SEIR. Regional construction emissions and localized impacts associated with the offsite improvements remain below the applicable SCAQMD significance thresholds. Construction GHG emissions associated with off-site improvements do not alter the SEIR’s significance determination.
Accordingly, the proposed off-site improvements would not change the air quality or GHG conclusions presented in the SEIR.
Attachments: A: Figures
B: SEIR Air Quality Mitigation Measures
C: CalEEMod Output Files
LSA
AIR QUALITY AND GREENHOUSE GAS I MPACT A NALYSIS FOR THE ONE BEVERLY HILLS P ROJECT – UNDERGROUND E LECTRICAL
INFRASTRUCTURE E XTENSION
A UGUST 2026
ONE BEVERLY HILLS P ROJECT
BEVERLY HILLS , C ALIFORNIA
P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx (08/06/26)
ATTACHMENT A
FIGURES
Figure 1: Project Location
Figure 2: Project Construction Boundary
LSA
L
SA
t
875 1750
FEET
SOURCE: Esri
(2025) l=I
Project Site
1:1 Southern California Edison (SCE) Electrical Infrastructure FIGURE 1
One Beverly Hills Project
Project
Location l:\2026\20263059\GIS\Pro\Cain Dev - One Beverly Hills\One Beverly Hills Project.aprx (Fig 1-Project location) 8/3/2026 10:35 AM 75 150
t=] Ra
Construction Boundary
FIGURE 2
One Beverly Hills Project
Project Construction Boundary
FEET
SOURCE: Nearmap (4/9/2026)
l:\2026\20263059\GIS\Pro\Cain Dev - One Beverly Hills\One Beverly Hills Project.aprx (Fig 2-Project Construction Boundary) 8/3/2026 10:36 AM
AIR QUALITY AND GREENHOUSE GAS I MPACT A NALYSIS FOR THE ONE BEVERLY HILLS P ROJECT – UNDERGROUND E LECTRICAL
INFRASTRUCTURE E XTENSION
A UGUST 2026
ONE BEVERLY HILLS P ROJECT
BEVERLY HILLS , C ALIFORNIA
P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx (08/06/26)
ATTACHMENT B
SEIR AIR QUALITY MITIGATION MEASURES
LSA
8/4/26 () 1
MM-AQ-1 Prior to issuance of a grading, demolition, or building permit, whichever comes first, the Developer shall prepare a Construction Traffic Emission Management Plan to minimize emissions from vehicles including, but not limited to, scheduling truck deliveries and haul routes to avoid peak-hour traffic conditions, consolidating truck deliveries, and prohibiting truck idling in excess of 5 minutes. The Construction Traffic Emission Management Plan shall be submitted to the City of Beverly Hills Community Development Department and reviewed and approved by the appropriate City Departments/Divisions (e.g., Building and Safety, Planning, Transportation).
MM-AQ-2 The Contractor shall ensure that the use of all fossil-fueled construction equipment is suspended during first-stage smog alerts.
MM-AQ-3 The Contractor shall promote the use of electricity or alternate fuels for on-site mobile equipment instead of diesel equipment to the extent feasible.
MM-AQ-4 The Contractor shall maintain construction equipment by conducting regular tuneups according to the manufacturers’ recommendations.
MM-AQ-5 The Contractor shall promote the use of electric welders to avoid emissions from gas or diesel welders, to the extent feasible.
MM-AQ-6 The Contractor shall promote the use of on-site electricity or alternative fuels rather than diesel-powered or gasoline-powered generators to the extent feasible.
MM-AQ-7 Prior to use in construction, the Developer and Contractor shall evaluate the feasibility of retrofitting the large off-road construction equipment that will be operating for significant periods. Retrofit technologies such as particulate traps, selective catalytic reduction, oxidation catalysts, air enhancement technologies, etc., shall be evaluated. These technologies shall be required if they are verified by CARB and/or the USEPA and are commercially available and can feasibly be retrofitted onto construction equipment. Prior to the start of each construction phase, the Contractor shall submit an equipment inventory report to the City of Beverly Hills Community Development Department for review and approval. The equipment inventory report shall indicate which equipment will not be operating for significant periods (and will thus be excluded from consideration for retrofits) and which equipment will be retrofitted. For all equipment that will operate for significant periods but will not be retrofitted, the equipment inventory report shall provide substantial evidence as to why retrofits are not available or feasible.
MM-AQ-8 The Contractor shall use tandem trucks (also known as double belly dump trucks) with a minimum capacity of 28 cubic yards (CY) for hauling soil material from the project site.
8/4/26 () 2
MM-AQ-9 Demolition and grading phases shall not be conducted concurrently. Each demolition or grading phase must be fully completed before commencement of the subsequent demolition or grading phase.
MM-AQ-10 The Contractor shall ensure that traffic speeds on all unpaved roads are reduced to 15 miles per hour or less.
MM-AQ-11 The Contractor shall ensure that the project site is watered at least three times daily during dry weather.
MM-AQ-12 The Contractor shall install wind monitoring equipment on site, to the extent feasible, and suspend grading activities when wind speeds exceed 25 miles per hour per SCAQMD guidelines.
MM-AQ-13 The Contractor shall water storage piles or apply cover when wind events are declared (wind speeds in excess of 25 miles per hour).
MM-AQ-14 The Contractor shall apply nontoxic chemical soil stabilizers on inactive construction areas (disturbed lands within construction projects that are unused for at least four consecutive days).
MM-AQ-15 The Contractor shall replace ground cover in disturbed areas as quickly as possible.
MM-AQ-16 The project proponent shall establish a third-party air quality consultant to conduct monitoring of the PM10 (dust) concentrations during the project demolition, excavation, and grading phases of project construction (approximately 588 work days) to determine compliance with applicable air quality standards. Monitoring shall be accomplished using DustTrak™ aerosol monitors or other similar monitoring network and shall meet the following requirements:
• The third-party consultant shall be approved by the City of Beverly Hills Planning Department.
• Costs for the monitoring network and tests by the third-party consultant shall be borne by the project applicant.
• Monitors shall be located in such a manner that appropriate upwind (background) and two downwind locations from the project are selected. The locations shall be selected in order to monitor the project’s contribution to ambient PM10 concentrations and to minimize the influence of dust contributions from outside sources. One downwind monitoring station shall be located near El Rodeo School’s southern perimeter. The other downwind monitor shall be located in an area beyond the project boundary where the general public could be present for a period of more than one hour. The upwind and downwind directions shall be based on the prevailing daytime wind 8/4/26 () 3
direction in the vicinity of the project site. All locations shall be approved by the third-party air quality consultant and the Community Development Director. • The monitoring network shall include at least one anemometer to measure wind speeds and directions.
• Each monitoring station shall be secured in such a manner to prevent access and tampering by unauthorized persons and to prevent damage to the equipment.
• Each monitoring station shall be sited in a location with access to necessary infrastructure (e.g., electricity needs, foundation requirements, internet connectivity).
• Monitors shall be calibrated using collocated filter-based samplers (Mini-Vol or other similar equipment). The third-party consultant shall calibrate the DustTrak™ monitors as needed to ensure that data is within acceptable margins of error as determined by manufacturer’s specifications. • The 5-hour rolling average dust concentration threshold is equal to the threshold specified in SCAQMD Rule 403 (50 micrograms per cubic meter) as determined by the difference between the upwind and downwind stations. The 1-hour average dust concentration threshold shall be set at a level of 150 micrograms per cubic meter to provide sufficient warning for on-site construction managers or supervisors to implement corrective measures. An exceedance of the 1-hour threshold shall not be deemed as a violation of any air quality standard or regulation.
• Monitoring shall be continuous and provide data at 5-minute intervals. The data shall report rolling 5-hour and rolling 1-hour average PM10 concentrations.
Monitoring shall be active on any day that construction activity occurs during the demolition, excavation, and grading phases of project construction. Data shall be made available to the third-party consultant, the City of Beverly Hills, the project applicant, and the on-site contractor on a secured internet website.
The general public shall have access to 5-hour average PM10 concentrations on a publicly accessible website.
• Monitors shall be equipped with a visual alarm (strobe light or similar) that shall notify appropriate on-site construction managers or supervisors if established thresholds are exceeded. Additionally, an email shall be sent to appropriate onsite construction managers or supervisors if specified PM10 thresholds are exceeded.
• All corrective measures, as necessary to reduce emissions to acceptable levels, shall be implemented immediately. If immediate implementation of a specific corrective measure will result in the creation of a hazardous situation, as 8/4/26 () 4
determined by the Environmental Monitor, construction activity shall be allowed to continue for a reasonable period of time as determined by the Environmental Monitor, until such time that it is safe to implement that corrective measure. Corrective measures shall be documented by the construction contractor in a logbook accessible to the third-party air quality consultant and the City of Beverly Hills. Records shall be maintained of the specific action taken, the time and date the corrective action was taken, and written verification by the appropriate on-site construction manager or supervisor that the corrective action was taken.
• The project applicant and contractor shall develop a corrective action plan. The plan shall be prepared and finalized prior to the commencement of project demolition, the Plan shall indicate steps to safely and adequately reduce on-site dust emissions. The plan shall contain a list of possible corrective measures. The measures shall include, but are not limited to, application of water or other soil stabilizers, temporary reduction in on-site vehicle speed, temporary reduction in construction activity, suspension of construction activity, and other appropriate measures. The plan shall also require notification of the Principal of El Rodeo School and the Beverly Hills Unified School District Superintendent in the event of an exceedance of any of the established thresholds. The project applicant and contractor shall obtain approval of the plan from the City of Beverly Hills Community Development Director prior to commencing demolition.
MM-AQ-17 The project applicant and/or contractor shall comply with SCAQMD Rule 403 by ensuring visible dust emissions from the project site do not go beyond the property line.
• The project applicant and/or contractor shall designate a person located on-site who is trained and certified by CARB to conduct visible emissions evaluations (VEE). The designated person shall ensure compliance with SCAQMD Rule 403 by observing for visible dust emissions beyond the property line during daytime working hours. Observations shall be conducted in accordance with USEPA Method 9 (Title 40, Code of Federal Regulations, Part 60, Appendix A). • The project applicant and/or contractor shall obtain a schedule of outdoor activities and athletic events at El Rodeo School and Beverly Hills High School during the construction period from the City or the Beverly Hills Unified School District as soon as the information becomes available, The City shall immediately provide this information to the project applicant and contractor.
Provided that the Beverly Hills Unified School District has provided the scheduling information in a timely manner, the project applicant and contractor shall require coordination of all construction activities so as to minimize the occurrence of high-emitting fugitive dust construction activities during the scheduled outdoor events to the extent feasible.
8/4/26 () 5
• In the event visible dust emissions are observed beyond the property line, the designated person shall immediately inform a lead supervisor or other appropriate managing personnel. The supervisor shall immediately implement corrective measures. If visible dust emissions are anticipated to impact El Rodeo School, the supervisor shall notify the Principal of El Rodeo School and the Beverly Hills Unified School District Superintendent. If immediate implementation of a corrective measure shall result in the creation of a hazardous situation, construction activity shall be allowed to continue for a reasonable period of time until such time that it is safe to implement corrective measures. Corrective measures shall be documented by the construction contractor in a logbook accessible to a third-party air quality consultant and the City of Beverly Hills. Records shall be maintained of the specific action taken, the time and date the corrective action was taken, and written verification by the appropriate on-site construction manager or supervisor that the corrective action was taken.
SCE U NDERGROUND E LECTRICAL INFRASTRUCTURE C ONSTRUCTION
AIR QUALITY AND GREENHOUSE GAS I MPACT A NALYSIS
A UGUST 2026
ONE BEVERLY HILLS P ROJECT
BEVERLY HILLS , C ALIFORNIA
P:\2026\20263059-One Beverly Hills\Product\AQ\One Beverly Hills AQ GHG Analysis.docx (08/06/26)
ATTACHMENT C
CALEEMOD OUTPUT FILES
LSA
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 OBH Off-Site Improvements (Area 1) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
4. Operations Emissions Details
1 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
2 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.1. Construction Phases
8.4.6. Trips and VMT
3 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Area 1)
Construction Start Date 8/10/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
4 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 0.08000 Mile 0.05000 0.00000 — — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 4.51867 3.29342 37.2653 47.2944 0.13570 1.21204 4.58023 5.79227 1.12549 1.19828 2.32376 — 19,181.0 19,181.0 0.95043 1.97061 31.2287 19,823.3 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.02471 0.01800 0.20870 0.25535 0.00074 0.00664 0.02483 0.03148 0.00617 0.00650 0.01267 — 104.820 104.820 0.00522 0.01080 0.07362 108.241 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00451 0.00328 0.03809 0.04660 0.00014 0.00121 0.00453 0.00574 0.00113 0.00119 0.00231 — 17.3541 17.3541 0.00086 0.00179 0.01219 17.9206
2.2. Construction Emissions by Year
5 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 4.51867 3.29342 37.2653 47.2944 0.13570 1.21204 4.58023 5.79227 1.12549 1.19828 2.32376 — 19,181.0 19,181.0 0.95043 1.97061 31.2287 19,823.3 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.02471 0.01800 0.20870 0.25535 0.00074 0.00664 0.02483 0.03148 0.00617 0.00650 0.01267 — 104.820 104.820 0.00522 0.01080 0.07362 108.241 Annual — — — — — — — — — — — — — — — — — —
2026 0.00451 0.00328 0.03809 0.04660 0.00014 0.00121 0.00453 0.00574 0.00113 0.00119 0.00231 — 17.3541 17.3541 0.00086 0.00179 0.01219 17.9206
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 3.23759 2.72048 22.7640 35.0012 0.05565 1.05941 0.01915 1.07855 0.97466 0.00290 0.97755 — 6,026.97 6,026.97 0.24448 0.04890 0.00000 6,047.65 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
6 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.01774 0.01491 0.12473 0.19179 0.00030 0.00580 0.00010 0.00591 0.00534 0.00002 0.00536 — 33.0245 33.0245 0.00134 0.00027 0.00000 33.1378 Annual — — — — — — — — — — — — — — — — — —
2026 0.00324 0.00272 0.02276 0.03500 0.00006 0.00106 0.00002 0.00108 0.00097 < 0.0000 05 0.00098 — 5.46758 5.46758 0.00022 0.00004 0.00000 5.48634
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.28108 0.57294 14.5013 12.2932 0.08004 0.15263 4.56108 4.71371 0.15083 1.19538 1.34621 — 13,154.1 13,154.1 0.70595 1.92171 31.2287 13,775.6 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00697 0.00309 0.08397 0.06356 0.00044 0.00084 0.02473 0.02557 0.00083 0.00648 0.00731 — 71.7951 71.7951 0.00388 0.01053 0.07362 75.1037 Annual — — — — — — — — — — — — — — — — — —
2026 0.00127 0.00056 0.01532 0.01160 0.00008 0.00015 0.00451 0.00467 0.00015 0.00118 0.00133 — 11.8865 11.8865 0.00064 0.00174 0.01219 12.4343
3. Construction Emissions Details
7 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.43314 1.20423 9.69363 14.2285 0.02627 0.40958 — 0.40958 0.37681 — 0.37681 — 2,845.10 2,845.10 0.11541 0.02308 — 2,854.86 Dust
From
Material
Moveme
nt
— — — — — — 0.01915 0.01915 — 0.00290 0.00290 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00785 0.00660 0.05312 0.07796 0.00014 0.00224 — 0.00224 0.00206 — 0.00206 — 15.5896 15.5896 0.00063 0.00013 — 15.6431 Dust
From
Material
Moveme
nt
— — — — — — 0.00010 0.00010 — 0.00002 0.00002 — — — — — — — 8 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00143 0.00120 0.00969 0.01423 0.00003 0.00041 — 0.00041 0.00038 — 0.00038 — 2.58103 2.58103 0.00010 0.00002 — 2.58989 Dust
From
Material
Moveme
nt
— — — — — — 0.00002 0.00002 — < 0.0000
05 < 0.0000
05 — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.20779 0.18409 0.19401 3.22922 0.00000 0.00000 0.65355 0.65355 0.00000 0.15319 0.15319 — 677.434 677.434 0.02811 0.02370 2.29211 687.492 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.83086 0.18256 13.8228 5.44341 0.07824 0.14903 3.13326 3.28229 0.14903 0.85783 1.00686 — 11,495.6 11,495.6 0.63711 1.83683 25.7871 12,084.7 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
9 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00113 0.00100 0.00130 0.01580 0.00000 0.00000 0.00354 0.00354 0.00000 0.00083 0.00083 — 3.57091 3.57091 0.00016 0.00013 0.00543 3.61904 Vendor 0.00005 0.00002 0.00079 0.00037 < 0.0000
05 0.00001 0.00019 0.00020 < 0.0000
05 0.00005 0.00006 — 0.68348 0.68348 0.00003 0.00010 0.00080 0.71404 Hauling 0.00451 0.00098 0.07968 0.02995 0.00043 0.00082 0.01700 0.01782 0.00082 0.00466 0.00548 — 63.0007 63.0007 0.00349 0.01006 0.06072 66.1480 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00021 0.00018 0.00024 0.00288 0.00000 0.00000 0.00065 0.00065 0.00000 0.00015 0.00015 — 0.59120 0.59120 0.00003 0.00002 0.00090 0.59917 Vendor 0.00001 < 0.0000
05 0.00014 0.00007 < 0.0000
05 < 0.0000
05 0.00003 0.00004 < 0.0000
05 0.00001 0.00001 — 0.11316 0.11316 < 0.0000
05 0.00002 0.00013 0.11822
Hauling 0.00082 0.00018 0.01454 0.00547 0.00008 0.00015 0.00310 0.00325 0.00015 0.00085 0.00100 — 10.4305 10.4305 0.00058 0.00167 0.01005 10.9516
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.80446 1.51624 13.0703 20.7726 0.02938 0.64983 — 0.64983 0.59784 — 0.59784 — 3,181.87 3,181.87 0.12907 0.02581 — 3,192.79 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
10 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00989 0.00831 0.07162 0.11382 0.00016 0.00356 — 0.00356 0.00328 — 0.00328 — 17.4349 17.4349 0.00071 0.00014 — 17.4947 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00180 0.00152 0.01307 0.02077 0.00003 0.00065 — 0.00065 0.00060 — 0.00060 — 2.88655 2.88655 0.00012 0.00002 — 2.89645 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.22441 0.19881 0.20953 3.48756 0.00000 0.00000 0.70583 0.70583 0.00000 0.16545 0.16545 — 731.629 731.629 0.03036 0.02560 2.47547 742.491 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
11 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00122 0.00108 0.00140 0.01707 0.00000 0.00000 0.00382 0.00382 0.00000 0.00089 0.00089 — 3.85658 3.85658 0.00017 0.00014 0.00587 3.90857 Vendor 0.00005 0.00002 0.00079 0.00037 < 0.0000
05 0.00001 0.00019 0.00020 < 0.0000
05 0.00005 0.00006 — 0.68348 0.68348 0.00003 0.00010 0.00080 0.71404 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00022 0.00020 0.00026 0.00311 0.00000 0.00000 0.00070 0.00070 0.00000 0.00016 0.00016 — 0.63850 0.63850 0.00003 0.00002 0.00097 0.64711 Vendor 0.00001 < 0.0000
05 0.00014 0.00007 < 0.0000
05 < 0.0000
05 0.00003 0.00004 < 0.0000
05 0.00001 0.00001 — 0.11316 0.11316 < 0.0000
05 0.00002 0.00013 0.11822
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
12 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
13 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
14 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Drainage,
Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
8/11/2026 8/12/2026 5.00000 2.00000 Main conduit installation, West Vault installation,
slurry backfill, and
shoring removal
Trenching Linear, Trenching 8/10/2026 8/11/2026 5.00000 2.00000 Potholing, saw cutting/ asphalt grinding, trench
excavation, and West
Vault excavation
5.2. Off-Road Equipment
5.2.1. Unmitigated
15 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Linear, Drainage,
Utilities, & Sub-Grade
Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Linear, Drainage,
Utilities, & Sub-Grade
Cranes Diesel Average 1.000000 10.00000 367.000 0.29000 Trenching Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Trenching Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Paving Equipment Diesel Average 1.000000 10.00000 89.0000 0.36000 Trenching Other Construction
Equipment
Diesel Average 3.00000 10.00000 82.0000 0.42000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeWorker 50.0000 18.5000 LDA,LDT1,LDT2 Linear, Drainage, Utilities, & SubGradeVendor 4.00000 10.2000 HHDT,MHDT Linear, Drainage, Utilities, & SubGradeHauling 169.000 20.0000 HHDT Linear, Drainage, Utilities, & SubGradeOnsite truck — — HHDT Trenching Worker 54.0000 18.5000 LDA,LDT1,LDT2
16 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Trenching Vendor 4.00000 10.2000 HHDT,MHDT
Trenching Hauling 0.00000 20.0000 HHDT
Trenching Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Drainage, Utilities, &
Sub-Grade
500.000 1,185.00 0.05000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
17 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year) 18 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
19 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
20 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
21 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
Education 5.85928
Housing 41.3815
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
22 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Median HI 91.35121263
Education —
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
2-parent households 26.03618632
Voting 66.04645194
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 23 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
24 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
Elderly 10.6
English Speaking 65.5
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
25 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Construction activities at Area 1 anticipated take place over a 4-day period 26 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Screen Justification
Construction: Off-Road Equipment Equipment list based on information provided by BALI Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations, hauling trips are based on the import/export quantities and assume a haul capacity of 10 CY
8.4. Construction
8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeStart Date 8/14/2026 8/11/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeEnd Date 8/15/2026 8/12/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeWork Days per Phase 1.000000 2.00000 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeDescription — Main conduit installation, West Vault installation, slurry backfill, and
shoring removal
Linear, Trenching Trenching Start Date 8/13/2026 8/10/2026 Linear, Trenching Trenching End Date — 8/11/2026
Linear, Trenching Trenching Work Days per Phase 0.00000 2.00000 Linear, Trenching Trenching Description — Potholing, saw cutting/asphalt grinding, trench excavation, and
West Vault excavation
8.4.6. Trips and VMT
27 / 28
OBH Off-Site Improvements (Area 1) Detailed Report, 7/30/2026 Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeWorker One-Way Trips per Day 12.5000 50.0000 Linear, Drainage, Utilities, & SubGradeVendor One-Way Trips per Day 0.00000 4.00000 Linear, Drainage, Utilities, & SubGradeHauling One-Way Trips per Day 70.3333 169.000 Trenching Worker One-Way Trips per Day 20.0000 54.0000
28 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 OBH Off-Site Improvements (Area 2) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
4. Operations Emissions Details
1 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
2 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.1. Construction Phases
8.4.6. Trips and VMT
3 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Area 2)
Construction Start Date 8/13/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
4 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 0.07000 Mile 0.04000 0.00000 — — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 3.63473 2.58119 30.0765 37.9249 0.11951 0.84220 4.15994 5.00214 0.78446 1.09233 1.87679 — 17,014.4 17,014.4 0.85122 1.83372 28.8168 17,610.9 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.02296 0.01538 0.21393 0.22128 0.00088 0.00532 0.03026 0.03558 0.00498 0.00804 0.01303 — 124.526 124.526 0.00639 0.01476 0.09588 129.180 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00419 0.00281 0.03904 0.04038 0.00016 0.00097 0.00552 0.00649 0.00091 0.00147 0.00238 — 20.6167 20.6167 0.00106 0.00244 0.01587 21.3873
2.2. Construction Emissions by Year
5 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 3.63473 2.58119 30.0765 37.9249 0.11951 0.84220 4.15994 5.00214 0.78446 1.09233 1.87679 — 17,014.4 17,014.4 0.85122 1.83372 28.8168 17,610.9 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.02296 0.01538 0.21393 0.22128 0.00088 0.00532 0.03026 0.03558 0.00498 0.00804 0.01303 — 124.526 124.526 0.00639 0.01476 0.09588 129.180 Annual — — — — — — — — — — — — — — — — — —
2026 0.00419 0.00281 0.03904 0.04038 0.00016 0.00097 0.00552 0.00649 0.00091 0.00147 0.00238 — 20.6167 20.6167 0.00106 0.00244 0.01587 21.3873
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.47423 2.07904 16.5370 27.0193 0.04456 0.69927 0.01193 0.71120 0.64333 0.00181 0.64514 — 4,825.33 4,825.33 0.19574 0.03915 0.00000 4,841.89 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
6 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.01463 0.01229 0.09842 0.15199 0.00027 0.00416 0.00010 0.00426 0.00383 0.00001 0.00384 — 28.8097 28.8097 0.00117 0.00023 0.00000 28.9085 Annual — — — — — — — — — — — — — — — — — —
2026 0.00267 0.00224 0.01796 0.02774 0.00005 0.00076 0.00002 0.00078 0.00070 < 0.0000 05 0.00070 — 4.76977 4.76977 0.00019 0.00004 0.00000 4.78614
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.16050 0.50215 13.5395 10.9056 0.07495 0.14293 4.14801 4.29094 0.14113 1.09052 1.23165 — 12,189.1 12,189.1 0.65549 1.79457 28.8168 12,769.0 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00833 0.00309 0.11551 0.06929 0.00061 0.00116 0.03016 0.03132 0.00116 0.00803 0.00918 — 95.7161 95.7161 0.00522 0.01453 0.09588 100.272 Annual — — — — — — — — — — — — — — — — — —
2026 0.00152 0.00056 0.02108 0.01265 0.00011 0.00021 0.00550 0.00572 0.00021 0.00147 0.00168 — 15.8469 15.8469 0.00086 0.00241 0.01587 16.6011
3. Construction Emissions Details
7 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.43314 1.20423 9.69363 14.2285 0.02627 0.40958 — 0.40958 0.37681 — 0.37681 — 2,845.10 2,845.10 0.11541 0.02308 — 2,854.86 Dust
From
Material
Moveme
nt
— — — — — — 0.01193 0.01193 — 0.00181 0.00181 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.01178 0.00990 0.07967 0.11695 0.00022 0.00337 — 0.00337 0.00310 — 0.00310 — 23.3844 23.3844 0.00095 0.00019 — 23.4646 Dust
From
Material
Moveme
nt
— — — — — — 0.00010 0.00010 — 0.00001 0.00001 — — — — — — — 8 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00215 0.00181 0.01454 0.02134 0.00004 0.00061 — 0.00061 0.00057 — 0.00057 — 3.87155 3.87155 0.00016 0.00003 — 3.88484 Dust
From
Material
Moveme
nt
— — — — — — 0.00002 0.00002 — < 0.0000
05 < 0.0000
05 — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.16623 0.14727 0.15521 2.58338 0.00000 0.00000 0.52284 0.52284 0.00000 0.12255 0.12255 — 541.947 541.947 0.02249 0.01896 1.83368 549.993 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.77678 0.17068 12.9231 5.08911 0.07315 0.13933 2.92932 3.06865 0.13933 0.80200 0.94133 — 10,747.4 10,747.4 0.59564 1.71727 24.1086 11,298.1 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
9 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00136 0.00120 0.00156 0.01896 0.00000 0.00000 0.00424 0.00424 0.00000 0.00099 0.00099 — 4.28509 4.28509 0.00019 0.00016 0.00652 4.34285 Vendor 0.00007 0.00003 0.00119 0.00055 0.00001 0.00001 0.00028 0.00029 0.00001 0.00008 0.00008 — 1.02522 1.02522 0.00004 0.00015 0.00119 1.07107 Hauling 0.00633 0.00137 0.11174 0.04200 0.00060 0.00115 0.02385 0.02499 0.00115 0.00653 0.00768 — 88.3500 88.3500 0.00490 0.01411 0.08516 92.7637 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00025 0.00022 0.00028 0.00346 0.00000 0.00000 0.00077 0.00077 0.00000 0.00018 0.00018 — 0.70945 0.70945 0.00003 0.00003 0.00108 0.71901 Vendor 0.00001 0.00001 0.00022 0.00010 < 0.0000
05 < 0.0000
05 0.00005 0.00005 < 0.0000
05 0.00001 0.00002 — 0.16974 0.16974 0.00001 0.00002 0.00020 0.17733 Hauling 0.00115 0.00025 0.02039 0.00767 0.00011 0.00021 0.00435 0.00456 0.00021 0.00119 0.00140 — 14.6274 14.6274 0.00081 0.00234 0.01410 15.3581
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.04109 0.87481 6.84335 12.7908 0.01829 0.28970 — 0.28970 0.26652 — 0.26652 — 1,980.23 1,980.23 0.08033 0.01607 — 1,987.02 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
10 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00285 0.00240 0.01875 0.03504 0.00005 0.00079 — 0.00079 0.00073 — 0.00073 — 5.42528 5.42528 0.00022 0.00004 — 5.44390 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00052 0.00044 0.00342 0.00640 0.00001 0.00014 — 0.00014 0.00013 — 0.00013 — 0.89822 0.89822 0.00004 0.00001 — 0.90130 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.19947 0.17672 0.18625 3.10005 0.00000 0.00000 0.62741 0.62741 0.00000 0.14706 0.14706 — 650.337 650.337 0.02698 0.02275 2.20042 659.992 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
11 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00054 0.00048 0.00062 0.00759 0.00000 0.00000 0.00170 0.00170 0.00000 0.00040 0.00040 — 1.71404 1.71404 0.00008 0.00006 0.00261 1.73714 Vendor 0.00002 0.00001 0.00040 0.00018 < 0.0000
05 < 0.0000
05 0.00009 0.00010 < 0.0000
05 0.00003 0.00003 — 0.34174 0.34174 0.00001 0.00005 0.00040 0.35702 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00010 0.00009 0.00011 0.00138 0.00000 0.00000 0.00031 0.00031 0.00000 0.00007 0.00007 — 0.28378 0.28378 0.00001 0.00001 0.00043 0.28760 Vendor < 0.0000
05 < 0.0000
05 0.00007 0.00003 < 0.0000
05 < 0.0000
05 0.00002 0.00002 < 0.0000
05 < 0.0000
05 0.00001 — 0.05658 0.05658 < 0.0000
05 0.00001 0.00007 0.05911
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
12 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
13 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
14 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Drainage,
Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
8/13/2026 8/17/2026 5.00000 3.00000 Main conduit installation, West Vault installation,
slurry backfill, and
shoring removal
Trenching Linear, Trenching 8/13/2026 8/13/2026 5.00000 1.000000 Potholing, saw cutting/ asphalt grinding, trench
excavation, and West
Vault excavation
5.2. Off-Road Equipment
5.2.1. Unmitigated
15 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Linear, Drainage,
Utilities, & Sub-Grade
Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Linear, Drainage,
Utilities, & Sub-Grade
Cranes Diesel Average 1.000000 10.00000 367.000 0.29000 Trenching Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Trenching Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Paving Equipment Diesel Average 1.000000 10.00000 89.0000 0.36000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeWorker 40.0000 18.5000 LDA,LDT1,LDT2 Linear, Drainage, Utilities, & SubGradeVendor 4.00000 10.2000 HHDT,MHDT Linear, Drainage, Utilities, & SubGradeHauling 158.000 20.0000 HHDT Linear, Drainage, Utilities, & SubGradeOnsite truck — — HHDT Trenching Worker 48.0000 18.5000 LDA,LDT1,LDT2
Trenching Vendor 4.00000 10.2000 HHDT,MHDT
Trenching Hauling 0.00000 20.0000 HHDT
16 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Trenching Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Drainage, Utilities, &
Sub-Grade
500.000 1,075.00 0.04000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
5.7. Construction Paving
17 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
18 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
19 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction 20 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
21 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
Education 5.85928
Housing 41.3815
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
Median HI 91.35121263
Education —
22 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
2-parent households 26.03618632
Voting 66.04645194
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
23 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
24 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
Elderly 10.6
English Speaking 65.5
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
7.3. Overall Health & Equity Scores
25 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Construction activities at Area 2 anticipated take place over a 4-day period Construction: Off-Road Equipment Equipment list based on information provided by BALI 26 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Screen Justification
Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations, hauling trips are based on the import/export quantities and assume a haul capacity of 10 CY
8.4. Construction
8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeStart Date 8/17/2026 8/13/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeEnd Date 8/18/2026 8/17/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeWork Days per Phase 1.000000 3.00000 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeDescription — Main conduit installation, West Vault installation, slurry backfill, and
shoring removal
Linear, Trenching Trenching Start Date 8/14/2026 8/13/2026 Linear, Trenching Trenching End Date 8/14/2026 8/13/2026
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeWorker One-Way Trips per Day 12.5000 40.0000 Linear, Drainage, Utilities, & SubGradeVendor One-Way Trips per Day 0.00000 4.00000 27 / 28
OBH Off-Site Improvements (Area 2) Detailed Report, 7/30/2026 Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeHauling One-Way Trips per Day 65.6667 158.000 Trenching Worker One-Way Trips per Day 12.5000 48.0000
28 / 28
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 OBH Off-Site Improvements (Area 3) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
4. Operations Emissions Details
1 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
2 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.1. Construction Phases
8.4.6. Trips and VMT
3 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Area 3)
Construction Start Date 8/18/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
4 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 0.03000 Mile 0.02000 0.00000 — — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.22464 1.03318 7.72194 15.5699 0.02732 0.29150 1.02342 1.28024 0.26742 0.25934 0.49662 — 3,974.66 3,974.66 0.18713 0.32152 5.98534 4,081.14 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00658 0.00534 0.04125 0.07905 0.00013 0.00150 0.00435 0.00585 0.00138 0.00108 0.00246 — 18.1008 18.1008 0.00082 0.00103 0.00974 18.4373 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00120 0.00097 0.00753 0.01443 0.00002 0.00027 0.00079 0.00107 0.00025 0.00020 0.00045 — 2.99679 2.99679 0.00014 0.00017 0.00161 3.05251
2.2. Construction Emissions by Year
5 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.22464 1.03318 7.72194 15.5699 0.02732 0.29150 1.02342 1.28024 0.26742 0.25934 0.49662 — 3,974.66 3,974.66 0.18713 0.32152 5.98534 4,081.14 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00658 0.00534 0.04125 0.07905 0.00013 0.00150 0.00435 0.00585 0.00138 0.00108 0.00246 — 18.1008 18.1008 0.00082 0.00103 0.00974 18.4373 Annual — — — — — — — — — — — — — — — — — —
2026 0.00120 0.00097 0.00753 0.01443 0.00002 0.00027 0.00079 0.00107 0.00025 0.00020 0.00045 — 2.99679 2.99679 0.00014 0.00017 0.00161 3.05251
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.04109 0.87481 6.84335 12.7908 0.01829 0.28970 0.00286 0.28970 0.26652 0.00043 0.26652 — 1,980.23 1,980.23 0.08033 0.01607 0.00000 1,987.02 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
6 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00527 0.00443 0.03350 0.06350 0.00009 0.00143 0.00001 0.00144 0.00132 < 0.0000 05 0.00132 — 9.82932 9.82932 0.00040 0.00008 0.00000 9.86306 Annual — — — — — — — — — — — — — — — — — —
2026 0.00096 0.00081 0.00611 0.01159 0.00002 0.00026 < 0.0000 05 0.00026 0.00024 < 0.0000
05 0.00024 — 1.62736 1.62736 0.00007 0.00001 0.00000 1.63294
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.29815 0.17801 2.33749 3.45512 0.01247 0.02385 1.02056 1.04441 0.02295 0.25891 0.28185 — 2,367.19 2,367.19 0.12192 0.30848 5.98534 2,468.15 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00131 0.00091 0.00775 0.01554 0.00004 0.00007 0.00434 0.00441 0.00007 0.00108 0.00114 — 8.27144 8.27144 0.00042 0.00095 0.00974 8.57426 Annual — — — — — — — — — — — — — — — — — —
2026 0.00024 0.00017 0.00141 0.00284 0.00001 0.00001 0.00079 0.00081 0.00001 0.00020 0.00021 — 1.36943 1.36943 0.00007 0.00016 0.00161 1.41957
3. Construction Emissions Details
7 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.88141 0.74063 5.38445 10.3872 0.01484 0.23297 — 0.23297 0.21433 — 0.21433 — 1,607.48 1,607.48 0.06521 0.01304 — 1,612.99 Dust
From
Material
Moveme
nt
— — — — — — 0.00286 0.00286 — 0.00043 0.00043 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00241 0.00203 0.01475 0.02846 0.00004 0.00064 — 0.00064 0.00059 — 0.00059 — 4.40404 4.40404 0.00018 0.00004 — 4.41916 Dust
From
Material
Moveme
nt
— — — — — — 0.00001 0.00001 — < 0.0000
05 < 0.0000
05 — — — — — — —
8 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00044 0.00037 0.00269 0.00519 0.00001 0.00012 — 0.00012 0.00011 — 0.00011 — 0.72914 0.72914 0.00003 0.00001 — 0.73164 Dust
From
Material
Moveme
nt
— — — — — — < 0.0000
05 < 0.0000
05 — < 0.0000
05 < 0.0000
05 — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.16623 0.14727 0.15521 2.58338 0.00000 0.00000 0.52284 0.52284 0.00000 0.12255 0.12255 — 541.947 541.947 0.02249 0.01896 1.83368 549.993 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.12291 0.02701 2.04479 0.80524 0.01157 0.02205 0.46350 0.48555 0.02205 0.12690 0.14894 — 1,700.53 1,700.53 0.09425 0.27172 3.81466 1,787.67 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
9 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00045 0.00040 0.00052 0.00632 0.00000 0.00000 0.00141 0.00141 0.00000 0.00033 0.00033 — 1.42836 1.42836 0.00006 0.00005 0.00217 1.44762 Vendor 0.00002 0.00001 0.00040 0.00018 < 0.0000
05 < 0.0000
05 0.00009 0.00010 < 0.0000
05 0.00003 0.00003 — 0.34174 0.34174 0.00001 0.00005 0.00040 0.35702 Hauling 0.00033 0.00007 0.00589 0.00222 0.00003 0.00006 0.00126 0.00132 0.00006 0.00034 0.00041 — 4.65981 4.65981 0.00026 0.00074 0.00449 4.89260 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00008 0.00007 0.00009 0.00115 0.00000 0.00000 0.00026 0.00026 0.00000 0.00006 0.00006 — 0.23648 0.23648 0.00001 0.00001 0.00036 0.23967 Vendor < 0.0000
05 < 0.0000
05 0.00007 0.00003 < 0.0000
05 < 0.0000
05 0.00002 0.00002 < 0.0000
05 < 0.0000
05 0.00001 — 0.05658 0.05658 < 0.0000
05 0.00001 0.00007 0.05911
Hauling 0.00006 0.00001 0.00108 0.00040 0.00001 0.00001 0.00023 0.00024 0.00001 0.00006 0.00007 — 0.77149 0.77149 0.00004 0.00012 0.00074 0.81003
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.04109 0.87481 6.84335 12.7908 0.01829 0.28970 — 0.28970 0.26652 — 0.26652 — 1,980.23 1,980.23 0.08033 0.01607 — 1,987.02 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
10 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00285 0.00240 0.01875 0.03504 0.00005 0.00079 — 0.00079 0.00073 — 0.00073 — 5.42528 5.42528 0.00022 0.00004 — 5.44390 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00052 0.00044 0.00342 0.00640 0.00001 0.00014 — 0.00014 0.00013 — 0.00013 — 0.89822 0.89822 0.00004 0.00001 — 0.90130 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.17454 0.15463 0.16297 2.71255 0.00000 0.00000 0.54898 0.54898 0.00000 0.12868 0.12868 — 569.045 569.045 0.02361 0.01991 1.92537 577.493 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
11 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00048 0.00042 0.00055 0.00664 0.00000 0.00000 0.00149 0.00149 0.00000 0.00035 0.00035 — 1.49978 1.49978 0.00007 0.00005 0.00228 1.52000 Vendor 0.00002 0.00001 0.00040 0.00018 < 0.0000
05 < 0.0000
05 0.00009 0.00010 < 0.0000
05 0.00003 0.00003 — 0.34174 0.34174 0.00001 0.00005 0.00040 0.35702 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00009 0.00008 0.00010 0.00121 0.00000 0.00000 0.00027 0.00027 0.00000 0.00006 0.00006 — 0.24831 0.24831 0.00001 0.00001 0.00038 0.25165 Vendor < 0.0000
05 < 0.0000
05 0.00007 0.00003 < 0.0000
05 < 0.0000
05 0.00002 0.00002 < 0.0000
05 < 0.0000
05 0.00001 — 0.05658 0.05658 < 0.0000
05 0.00001 0.00007 0.05911
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
12 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
13 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
14 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Drainage,
Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
8/19/2026 8/19/2026 5.00000 1.000000 —
Trenching Linear, Trenching 8/18/2026 8/18/2026 5.00000 1.000000 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 15 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Trenching Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Paving Equipment Diesel Average 1.000000 10.00000 89.0000 0.36000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeWorker 40.0000 18.5000 LDA,LDT1,LDT2 Linear, Drainage, Utilities, & SubGradeVendor 4.00000 10.2000 HHDT,MHDT Linear, Drainage, Utilities, & SubGradeHauling 25.0000 20.0000 HHDT Linear, Drainage, Utilities, & SubGradeOnsite truck — — HHDT Trenching Worker 42.0000 18.5000 LDA,LDT1,LDT2
Trenching Vendor 4.00000 10.2000 HHDT,MHDT
Trenching Hauling 0.00000 20.0000 HHDT
Trenching Onsite truck — — HHDT
5.4. Vehicles
16 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Drainage, Utilities, &
Sub-Grade
55.0000 71.0000 0.02000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
17 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat 18 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Climate Hazard Result for Project Location Unit
Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
19 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
20 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
21 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Education 5.85928
Housing 41.3815
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
Median HI 91.35121263
Education —
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
22 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
2-parent households 26.03618632
Voting 66.04645194
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
23 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
24 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Elderly 10.6
English Speaking 65.5
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. 25 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Construction activities at Area 3 anticipated take place over a 2-day period Construction: Off-Road Equipment Equipment list based on information provided by BALI Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations, hauling trips are based on the import/export quantities and assume a haul capacity of 10 CY
8.4. Construction
8.4.1. Construction Phases
26 / 27
OBH Off-Site Improvements (Area 3) Detailed Report, 7/30/2026 Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeStart Date 8/21/2026 8/19/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeEnd Date 8/22/2026 8/19/2026
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeWorker One-Way Trips per Day 10.00000 40.0000 Linear, Drainage, Utilities, & SubGradeVendor One-Way Trips per Day 0.00000 4.00000 Linear, Drainage, Utilities, & SubGradeHauling One-Way Trips per Day 16.0000 25.0000 Trenching Worker One-Way Trips per Day 12.5000 42.0000
27 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 OBH Off-Site Improvements (Area 4) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
4. Operations Emissions Details
1 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
2 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.1. Construction Phases
8.4.4. Dust from Material Movement
8.4.6. Trips and VMT
3 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Area 4)
Construction Start Date 8/20/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
4 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 0.01000 Mile 0.01000 0.00000 — — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.03788 1.71880 13.4174 24.3267 0.03028 0.65163 0.74005 1.39168 0.59874 0.17490 0.77365 — 4,038.21 4,038.21 0.16461 0.06921 2.81248 4,065.76 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00847 0.00714 0.05257 0.10059 0.00013 0.00243 0.00351 0.00594 0.00223 0.00083 0.00306 — 17.1616 17.1616 0.00071 0.00033 0.00590 17.2825 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00155 0.00130 0.00959 0.01836 0.00002 0.00044 0.00064 0.00108 0.00041 0.00015 0.00056 — 2.84130 2.84130 0.00012 0.00005 0.00098 2.86131
2.2. Construction Emissions by Year
5 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.03788 1.71880 13.4174 24.3267 0.03028 0.65163 0.74005 1.39168 0.59874 0.17490 0.77365 — 4,038.21 4,038.21 0.16461 0.06921 2.81248 4,065.76 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00847 0.00714 0.05257 0.10059 0.00013 0.00243 0.00351 0.00594 0.00223 0.00083 0.00306 — 17.1616 17.1616 0.00071 0.00033 0.00590 17.2825 Annual — — — — — — — — — — — — — — — — — —
2026 0.00155 0.00130 0.00959 0.01836 0.00002 0.00044 0.00064 0.00108 0.00041 0.00015 0.00056 — 2.84130 2.84130 0.00012 0.00005 0.00098 2.86131
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.80446 1.51624 13.0703 20.7726 0.02938 0.64983 0.00000 0.64983 0.59784 0.00000 0.59784 — 3,181.87 3,181.87 0.12907 0.02581 0.00000 3,192.79 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
6 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00736 0.00618 0.05056 0.08537 0.00012 0.00242 0.00000 0.00242 0.00223 0.00000 0.00223 — 13.1215 13.1215 0.00053 0.00011 0.00000 13.1665 Annual — — — — — — — — — — — — — — — — — —
2026 0.00134 0.00113 0.00923 0.01558 0.00002 0.00044 0.00000 0.00044 0.00041 0.00000 0.00041 — 2.17241 2.17241 0.00009 0.00002 0.00000 2.17987
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.23342 0.20255 0.34703 3.55407 0.00090 0.00180 0.74005 0.74185 0.00090 0.17490 0.17580 — 856.338 856.338 0.03554 0.04339 2.81248 872.969 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00111 0.00096 0.00201 0.01522 < 0.0000
05 0.00001 0.00351 0.00352 < 0.0000
05 0.00083 0.00083 — 4.04013 4.04013 0.00018 0.00022 0.00590 4.11594 Annual — — — — — — — — — — — — — — — — — —
2026 0.00020 0.00017 0.00037 0.00278 < 0.0000
05 < 0.0000
05 0.00064 0.00064 < 0.0000
05 0.00015 0.00015 — 0.66889 0.66889 0.00003 0.00004 0.00098 0.68144
3. Construction Emissions Details
7 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.88141 0.74063 5.38445 10.3872 0.01484 0.23297 — 0.23297 0.21433 — 0.21433 — 1,607.48 1,607.48 0.06521 0.01304 — 1,612.99 Dust
From
Material
Moveme
nt
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00241 0.00203 0.01475 0.02846 0.00004 0.00064 — 0.00064 0.00059 — 0.00059 — 4.40404 4.40404 0.00018 0.00004 — 4.41916 Dust
From
Material
Moveme
nt
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — 8 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00044 0.00037 0.00269 0.00519 0.00001 0.00012 — 0.00012 0.00011 — 0.00011 — 0.72914 0.72914 0.00003 0.00001 — 0.73164 Dust
From
Material
Moveme
nt
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.16623 0.14727 0.15521 2.58338 0.00000 0.00000 0.52284 0.52284 0.00000 0.12255 0.12255 — 541.947 541.947 0.02249 0.01896 1.83368 549.993 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
9 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00045 0.00040 0.00052 0.00632 0.00000 0.00000 0.00141 0.00141 0.00000 0.00033 0.00033 — 1.42836 1.42836 0.00006 0.00005 0.00217 1.44762 Vendor 0.00002 0.00001 0.00040 0.00018 < 0.0000
05 < 0.0000
05 0.00009 0.00010 < 0.0000
05 0.00003 0.00003 — 0.34174 0.34174 0.00001 0.00005 0.00040 0.35702 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00008 0.00007 0.00009 0.00115 0.00000 0.00000 0.00026 0.00026 0.00000 0.00006 0.00006 — 0.23648 0.23648 0.00001 0.00001 0.00036 0.23967 Vendor < 0.0000
05 < 0.0000
05 0.00007 0.00003 < 0.0000
05 < 0.0000
05 0.00002 0.00002 < 0.0000
05 < 0.0000
05 0.00001 — 0.05658 0.05658 < 0.0000
05 0.00001 0.00007 0.05911
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.80446 1.51624 13.0703 20.7726 0.02938 0.64983 — 0.64983 0.59784 — 0.59784 — 3,181.87 3,181.87 0.12907 0.02581 — 3,192.79 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
10 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00494 0.00415 0.03581 0.05691 0.00008 0.00178 — 0.00178 0.00164 — 0.00164 — 8.71745 8.71745 0.00035 0.00007 — 8.74737 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00090 0.00076 0.00654 0.01039 0.00001 0.00032 — 0.00032 0.00030 — 0.00030 — 1.44327 1.44327 0.00006 0.00001 — 1.44823 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.22441 0.19881 0.20953 3.48756 0.00000 0.00000 0.70583 0.70583 0.00000 0.16545 0.16545 — 731.629 731.629 0.03036 0.02560 2.47547 742.491 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
11 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00061 0.00054 0.00070 0.00853 0.00000 0.00000 0.00191 0.00191 0.00000 0.00045 0.00045 — 1.92829 1.92829 0.00009 0.00007 0.00293 1.95428 Vendor 0.00002 0.00001 0.00040 0.00018 < 0.0000
05 < 0.0000
05 0.00009 0.00010 < 0.0000
05 0.00003 0.00003 — 0.34174 0.34174 0.00001 0.00005 0.00040 0.35702 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00011 0.00010 0.00013 0.00156 0.00000 0.00000 0.00035 0.00035 0.00000 0.00008 0.00008 — 0.31925 0.31925 0.00001 0.00001 0.00049 0.32355 Vendor < 0.0000
05 < 0.0000
05 0.00007 0.00003 < 0.0000
05 < 0.0000
05 0.00002 0.00002 < 0.0000
05 < 0.0000
05 0.00001 — 0.05658 0.05658 < 0.0000
05 0.00001 0.00007 0.05911
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
12 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
13 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
14 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Drainage,
Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
8/21/2026 8/21/2026 5.00000 1.000000 —
Trenching Linear, Trenching 8/20/2026 8/20/2026 5.00000 1.000000 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 15 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Trenching Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Paving Equipment Diesel Average 1.000000 10.00000 89.0000 0.36000 Trenching Other Construction
Equipment
Diesel Average 3.00000 10.00000 82.0000 0.42000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeWorker 40.0000 18.5000 LDA,LDT1,LDT2 Linear, Drainage, Utilities, & SubGradeVendor 4.00000 10.2000 HHDT,MHDT Linear, Drainage, Utilities, & SubGradeHauling 0.00000 20.0000 HHDT Linear, Drainage, Utilities, & SubGradeOnsite truck — — HHDT Trenching Worker 54.0000 18.5000 LDA,LDT1,LDT2
Trenching Vendor 4.00000 10.2000 HHDT,MHDT
Trenching Hauling 0.00000 20.0000 HHDT
Trenching Onsite truck — — HHDT
16 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Drainage, Utilities, &
Sub-Grade
0.00000 0.00000 0.02000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
17 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat 18 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Climate Hazard Result for Project Location Unit
Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
19 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
20 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
21 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Education 5.85928
Housing 41.3815
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
Median HI 91.35121263
Education —
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
22 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
2-parent households 26.03618632
Voting 66.04645194
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
23 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
24 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Elderly 10.6
English Speaking 65.5
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. 25 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Construction activities at Area 3 anticipated take place over a 2-day period Construction: Off-Road Equipment Equipment list based on information provided by BALI Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations, hauling trips are based on the import/export quantities and assume a haul capacity of 10 CY
8.4. Construction
8.4.1. Construction Phases
26 / 27
OBH Off-Site Improvements (Area 4) Detailed Report, 7/30/2026 Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeStart Date 8/23/2026 8/21/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeEnd Date 8/24/2026 8/21/2026
8.4.4. Dust from Material Movement
Phase Name Model Parameter Units Default Value New Value Linear, Drainage, Utilities, & SubGradeMaterial Imported Cubic Yards — 0.00000 Linear, Drainage, Utilities, & SubGradeMaterial Exported Cubic Yards — 0.00000 Linear, Drainage, Utilities, & SubGradeTotal Acres Graded acres 0.01000 0.02000
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeWorker One-Way Trips per Day 10.00000 40.0000 Linear, Drainage, Utilities, & SubGradeVendor One-Way Trips per Day 0.00000 4.00000 Trenching Worker One-Way Trips per Day 20.0000 54.0000
27 / 27
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 OBH Off-Site Improvements (Area 5) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Paving (2026)
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
3.3. Trenching (2026)
1 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026
3.3.1. Onsite - Unmitigated
3.3.2. Offsite - Unmitigated
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
2 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.1. Construction Phases
3 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026
8.4.2. Off-Road Equipment
8.4.6. Trips and VMT
4 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Area 5)
Construction Start Date 8/22/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
5 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 0.01000 Mile 0.01000 0.00000 — — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 3.23218 2.64068 21.3847 38.2657 0.05899 0.91109 2.07332 2.74433 0.83867 0.50962 1.28841 — 8,216.93 8,216.93 0.36305 0.43397 10.2492 8,361.42 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.03238 0.02683 0.20620 0.37868 0.00053 0.00903 0.01723 0.02627 0.00830 0.00418 0.01248 — 74.7659 74.7659 0.00325 0.00295 0.03422 75.7594 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00591 0.00490 0.03763 0.06911 0.00010 0.00165 0.00315 0.00479 0.00152 0.00076 0.00228 — 12.3783 12.3783 0.00054 0.00049 0.00567 12.5428
2.2. Construction Emissions by Year
6 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 3.23218 2.64068 21.3847 38.2657 0.05899 0.91109 2.07332 2.74433 0.83867 0.50962 1.28841 — 8,216.93 8,216.93 0.36305 0.43397 10.2492 8,361.42 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.03238 0.02683 0.20620 0.37868 0.00053 0.00903 0.01723 0.02627 0.00830 0.00418 0.01248 — 74.7659 74.7659 0.00325 0.00295 0.03422 75.7594 Annual — — — — — — — — — — — — — — — — — —
2026 0.00591 0.00490 0.03763 0.06911 0.00010 0.00165 0.00315 0.00479 0.00152 0.00076 0.00228 — 12.3783 12.3783 0.00054 0.00049 0.00567 12.5428
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.68587 2.25687 18.4548 31.1598 0.04422 0.88280 0.00469 0.88750 0.81218 0.00071 0.81289 — 4,789.35 4,789.35 0.19428 0.03886 0.00000 4,805.78 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
7 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.02707 0.02274 0.18481 0.31124 0.00044 0.00886 0.00003 0.00888 0.00815 < 0.0000 05 0.00815 — 47.8103 47.8103 0.00194 0.00039 0.00000 47.9743 Annual — — — — — — — — — — — — — — — — — —
2026 0.00494 0.00415 0.03373 0.05680 0.00008 0.00162 < 0.0000 05 0.00162 0.00149 < 0.0000
05 0.00149 — 7.91553 7.91553 0.00032 0.00006 0.00000 7.94270
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.62563 0.45195 3.06848 8.30159 0.01521 0.02919 2.06862 2.09781 0.02694 0.50891 0.53585 — 3,733.82 3,733.82 0.18148 0.40190 10.2492 3,868.37 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00531 0.00409 0.02138 0.06744 0.00009 0.00017 0.01721 0.01738 0.00016 0.00417 0.00433 — 26.9556 26.9556 0.00131 0.00256 0.03422 27.7851 Annual — — — — — — — — — — — — — — — — — —
2026 0.00097 0.00075 0.00390 0.01231 0.00002 0.00003 0.00314 0.00317 0.00003 0.00076 0.00079 — 4.46281 4.46281 0.00022 0.00042 0.00567 4.60014
3. Construction Emissions Details
8 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.88141 0.74063 5.38445 10.3872 0.01484 0.23297 — 0.23297 0.21433 — 0.21433 — 1,607.48 1,607.48 0.06521 0.01304 — 1,612.99 Dust
From
Material
Moveme
nt
— — — — — — 0.00469 0.00469 — 0.00071 0.00071 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00483 0.00406 0.02950 0.05692 0.00008 0.00128 — 0.00128 0.00117 — 0.00117 — 8.80809 8.80809 0.00036 0.00007 — 8.83831 Dust
From
Material
Moveme
nt
— — — — — — 0.00003 0.00003 — < 0.0000
05 < 0.0000
05 — — — — — — —
9 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00088 0.00074 0.00538 0.01039 0.00001 0.00023 — 0.00023 0.00021 — 0.00021 — 1.45828 1.45828 0.00006 0.00001 — 1.46328 Dust
From
Material
Moveme
nt
— — — — — — < 0.0000
05 < 0.0000
05 — < 0.0000
05 < 0.0000
05 — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.16623 0.14727 0.15521 2.58338 0.00000 0.00000 0.52284 0.52284 0.00000 0.12255 0.12255 — 541.947 541.947 0.02249 0.01896 1.83368 549.993 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.13766 0.03025 2.29016 0.90187 0.01296 0.02469 0.51912 0.54381 0.02469 0.14213 0.16682 — 1,904.59 1,904.59 0.10556 0.30433 4.27242 2,002.19 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
10 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00091 0.00080 0.00104 0.01264 0.00000 0.00000 0.00283 0.00283 0.00000 0.00066 0.00066 — 2.85673 2.85673 0.00013 0.00010 0.00435 2.89523 Vendor 0.00005 0.00002 0.00079 0.00037 < 0.0000
05 0.00001 0.00019 0.00020 < 0.0000
05 0.00005 0.00006 — 0.68348 0.68348 0.00003 0.00010 0.00080 0.71404 Hauling 0.00075 0.00016 0.01320 0.00496 0.00007 0.00014 0.00282 0.00295 0.00014 0.00077 0.00091 — 10.4380 10.4380 0.00058 0.00167 0.01006 10.9594 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00017 0.00015 0.00019 0.00231 0.00000 0.00000 0.00052 0.00052 0.00000 0.00012 0.00012 — 0.47296 0.47296 0.00002 0.00002 0.00072 0.47934 Vendor 0.00001 < 0.0000
05 0.00014 0.00007 < 0.0000
05 < 0.0000
05 0.00003 0.00004 < 0.0000
05 0.00001 0.00001 — 0.11316 0.11316 < 0.0000
05 0.00002 0.00013 0.11822
Hauling 0.00014 0.00003 0.00241 0.00091 0.00001 0.00002 0.00051 0.00054 0.00002 0.00014 0.00017 — 1.72813 1.72813 0.00010 0.00028 0.00167 1.81446
3.2. Paving (2026)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.35159 1.13571 8.73862 15.2554 0.02165 0.40885 — 0.40885 0.37614 — 0.37614 — 2,345.09 2,345.09 0.09513 0.01903 — 2,353.14 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
11 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00741 0.00622 0.04788 0.08359 0.00012 0.00224 — 0.00224 0.00206 — 0.00206 — 12.8498 12.8498 0.00052 0.00010 — 12.8939 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00135 0.00114 0.00874 0.01526 0.00002 0.00041 — 0.00041 0.00038 — 0.00038 — 2.12743 2.12743 0.00009 0.00002 — 2.13473 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.29921 0.26508 0.27937 4.65008 0.00000 0.00000 0.94111 0.94111 0.00000 0.22059 0.22059 — 975.505 975.505 0.04048 0.03413 3.30063 989.988 Vendor 0.01352 0.00561 0.20625 0.09976 0.00135 0.00270 0.05134 0.05403 0.00135 0.01418 0.01553 — 187.063 187.063 0.00778 0.02669 0.50550 195.718 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
12 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00163 0.00144 0.00187 0.02276 0.00000 0.00000 0.00509 0.00509 0.00000 0.00119 0.00119 — 5.14211 5.14211 0.00023 0.00019 0.00782 5.21142 Vendor 0.00007 0.00003 0.00119 0.00055 0.00001 0.00001 0.00028 0.00029 0.00001 0.00008 0.00008 — 1.02522 1.02522 0.00004 0.00015 0.00119 1.07107 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00030 0.00026 0.00034 0.00415 0.00000 0.00000 0.00093 0.00093 0.00000 0.00022 0.00022 — 0.85133 0.85133 0.00004 0.00003 0.00130 0.86281 Vendor 0.00001 0.00001 0.00022 0.00010 < 0.0000
05 < 0.0000
05 0.00005 0.00005 < 0.0000
05 0.00001 0.00002 — 0.16974 0.16974 0.00001 0.00002 0.00020 0.17733 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3. Trenching (2026)
3.3.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.80446 1.51624 13.0703 20.7726 0.02938 0.64983 — 0.64983 0.59784 — 0.59784 — 3,181.87 3,181.87 0.12907 0.02581 — 3,192.79 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
13 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.01483 0.01246 0.10743 0.17073 0.00024 0.00534 — 0.00534 0.00491 — 0.00491 — 26.1523 26.1523 0.00106 0.00021 — 26.2421 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00271 0.00227 0.01961 0.03116 0.00004 0.00097 — 0.00097 0.00090 — 0.00090 — 4.32982 4.32982 0.00018 0.00004 — 4.34468 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.22441 0.19881 0.20953 3.48756 0.00000 0.00000 0.70583 0.70583 0.00000 0.16545 0.16545 — 731.629 731.629 0.03036 0.02560 2.47547 742.491 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
14 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00183 0.00161 0.00210 0.02560 0.00000 0.00000 0.00573 0.00573 0.00000 0.00134 0.00134 — 5.78487 5.78487 0.00026 0.00021 0.00880 5.86285 Vendor 0.00007 0.00003 0.00119 0.00055 0.00001 0.00001 0.00028 0.00029 0.00001 0.00008 0.00008 — 1.02522 1.02522 0.00004 0.00015 0.00119 1.07107 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00033 0.00029 0.00038 0.00467 0.00000 0.00000 0.00105 0.00105 0.00000 0.00024 0.00024 — 0.95775 0.95775 0.00004 0.00003 0.00146 0.97066 Vendor 0.00001 0.00001 0.00022 0.00010 < 0.0000
05 < 0.0000
05 0.00005 0.00005 < 0.0000
05 0.00001 0.00002 — 0.16974 0.16974 0.00001 0.00002 0.00020 0.17733 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
15 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
16 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
17 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Drainage,
Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
8/26/2026 8/27/2026 5.00000 2.00000 Main conduit installation, West Vault installation,
slurry backfill, and
shoring removal
Paving Linear, Paving 8/27/2026 8/28/2026 5.00000 2.00000 — Trenching Linear, Trenching 8/22/2026 8/26/2026 5.00000 3.00000 Potholing, saw cutting/ asphalt grinding, trench
excavation, and West
Vault excavation
5.2. Off-Road Equipment
5.2.1. Unmitigated
18 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Linear, Drainage,
Utilities, & Sub-Grade
Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Paving Pavers Diesel Average 1.000000 10.00000 81.0000 0.42000 Paving Rollers Diesel Average 1.000000 10.00000 36.0000 0.38000 Paving Sweepers/Scrubbers Diesel Average 1.000000 10.00000 36.0000 0.46000 Paving Skid Steer Loaders Diesel Average 1.000000 10.00000 71.0000 0.37000 Paving Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Trenching Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Paving Equipment Diesel Average 1.000000 10.00000 89.0000 0.36000 Trenching Other Construction
Equipment
Diesel Average 3.00000 10.00000 82.0000 0.42000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeWorker 40.0000 18.5000 LDA,LDT1,LDT2 Linear, Drainage, Utilities, & SubGradeVendor 4.00000 10.2000 HHDT,MHDT 19 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeHauling 28.0000 20.0000 HHDT Linear, Drainage, Utilities, & SubGradeOnsite truck — — HHDT Paving Worker 72.0000 18.5000 LDA,LDT1,LDT2
Paving Vendor 6.00000 10.2000 HHDT,MHDT
Paving Hauling 0.00000 20.0000 HHDT
Paving Onsite truck — — HHDT
Trenching Worker 54.0000 18.5000 LDA,LDT1,LDT2
Trenching Vendor 4.00000 10.2000 HHDT,MHDT
Trenching Hauling 0.00000 20.0000 HHDT
Trenching Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
20 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Drainage, Utilities, &
Sub-Grade
248.000 165.000 0.01000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
21 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
22 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
23 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
24 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
Education 5.85928
Housing 41.3815
25 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
Median HI 91.35121263
Education —
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
2-parent households 26.03618632
Voting 66.04645194
26 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
27 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
Elderly 10.6
English Speaking 65.5
28 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
29 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Construction activities at Area 5 anticipated take place over a 7-day period Construction: Off-Road Equipment Equipment list based on information provided by BALI Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations, hauling trips are based on the import/export quantities and assume a haul capacity of 10 CY
8.4. Construction
8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeStart Date 8/29/2026 8/26/2026 30 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeEnd Date 8/31/2026 8/27/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeDescription — Main conduit installation, West Vault installation, slurry backfill, and
shoring removal
Linear, Paving Paving Start Date 8/29/2026 8/27/2026
Linear, Paving Paving End Date 9/1/2026 8/28/2026
Linear, Trenching Trenching Start Date 8/23/2026 8/22/2026
8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New Value Paving Pavers Number per Day 0.00000 1.000000
Paving Pavers Hours Per Day 8.00000 10.00000
Paving Rollers Number per Day 0.00000 1.000000
Paving Rollers Hours Per Day 8.00000 10.00000
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeWorker One-Way Trips per Day 10.00000 40.0000 Linear, Drainage, Utilities, & SubGradeVendor One-Way Trips per Day 0.00000 4.00000 Linear, Drainage, Utilities, & SubGradeHauling One-Way Trips per Day 26.0000 28.0000 31 / 32
OBH Off-Site Improvements (Area 5) Detailed Report, 7/30/2026 Phase Name Trip Type Model Parameter Default Value New Value Paving Worker One-Way Trips per Day 15.0000 72.0000
Paving Vendor One-Way Trips per Day 0.00000 6.00000
Trenching Worker One-Way Trips per Day 20.0000 54.0000
32 / 32
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 OBH Off-Site Improvements (Area 6) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
4. Operations Emissions Details
1 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
2 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.1. Construction Phases
8.4.6. Trips and VMT
3 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Area 6)
Construction Start Date 8/29/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
4 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 0.01000 Mile 0.01000 0.00000 — — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 3.19356 2.66542 19.9590 38.4609 0.05065 0.89522 1.64049 2.53571 0.82280 0.39460 1.21740 — 7,155.13 7,155.13 0.30194 0.23338 7.05913 7,239.29 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.01190 0.00987 0.07327 0.14112 0.00019 0.00312 0.00688 0.01000 0.00287 0.00166 0.00453 — 27.9206 27.9206 0.00121 0.00109 0.01337 28.2889 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00217 0.00180 0.01337 0.02576 0.00004 0.00057 0.00126 0.00182 0.00052 0.00030 0.00083 — 4.62258 4.62258 0.00020 0.00018 0.00221 4.68355
2.2. Construction Emissions by Year
5 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 3.19356 2.66542 19.9590 38.4609 0.05065 0.89522 1.64049 2.53571 0.82280 0.39460 1.21740 — 7,155.13 7,155.13 0.30194 0.23338 7.05913 7,239.29 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.01190 0.00987 0.07327 0.14112 0.00019 0.00312 0.00688 0.01000 0.00287 0.00166 0.00453 — 27.9206 27.9206 0.00121 0.00109 0.01337 28.2889 Annual — — — — — — — — — — — — — — — — — —
2026 0.00217 0.00180 0.01337 0.02576 0.00004 0.00057 0.00126 0.00182 0.00052 0.00030 0.00083 — 4.62258 4.62258 0.00020 0.00018 0.00221 4.68355
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.68587 2.25687 18.4548 31.1598 0.04422 0.88280 0.00112 0.88393 0.81218 0.00017 0.81235 — 4,789.35 4,789.35 0.19428 0.03886 0.00000 4,805.78 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
6 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00977 0.00821 0.06531 0.11383 0.00016 0.00306 0.00001 0.00306 0.00281 < 0.0000 05 0.00281 — 17.5255 17.5255 0.00071 0.00014 0.00000 17.5857 Annual — — — — — — — — — — — — — — — — — —
2026 0.00178 0.00150 0.01192 0.02077 0.00003 0.00056 < 0.0000 05 0.00056 0.00051 < 0.0000
05 0.00051 — 2.90155 2.90155 0.00012 0.00002 0.00000 2.91151
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.50769 0.40854 1.50421 7.30106 0.00643 0.01242 1.63937 1.65178 0.01062 0.39443 0.40505 — 2,365.79 2,365.79 0.10766 0.19452 7.05913 2,433.51 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00213 0.00166 0.00796 0.02730 0.00003 0.00006 0.00687 0.00693 0.00006 0.00166 0.00172 — 10.3951 10.3951 0.00050 0.00095 0.01337 10.7032 Annual — — — — — — — — — — — — — — — — — —
2026 0.00039 0.00030 0.00145 0.00498 0.00001 0.00001 0.00125 0.00127 0.00001 0.00030 0.00031 — 1.72103 1.72103 0.00008 0.00016 0.00221 1.77204
3. Construction Emissions Details
7 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.88141 0.74063 5.38445 10.3872 0.01484 0.23297 — 0.23297 0.21433 — 0.21433 — 1,607.48 1,607.48 0.06521 0.01304 — 1,612.99 Dust
From
Material
Moveme
nt
— — — — — — 0.00112 0.00112 — 0.00017 0.00017 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00483 0.00406 0.02950 0.05692 0.00008 0.00128 — 0.00128 0.00117 — 0.00117 — 8.80809 8.80809 0.00036 0.00007 — 8.83831 Dust
From
Material
Moveme
nt
— — — — — — 0.00001 0.00001 — < 0.0000
05 < 0.0000
05 — — — — — — —
8 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00088 0.00074 0.00538 0.01039 0.00001 0.00023 — 0.00023 0.00021 — 0.00021 — 1.45828 1.45828 0.00006 0.00001 — 1.46328 Dust
From
Material
Moveme
nt
— — — — — — < 0.0000
05 < 0.0000
05 — < 0.0000
05 < 0.0000
05 — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21610 0.19145 0.20177 3.35839 0.00000 0.00000 0.67969 0.67969 0.00000 0.15932 0.15932 — 704.532 704.532 0.02923 0.02465 2.38379 714.991 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.04916 0.01080 0.81791 0.32210 0.00463 0.00882 0.18540 0.19422 0.00882 0.05076 0.05958 — 680.212 680.212 0.03770 0.10869 1.52586 715.069 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
9 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00118 0.00104 0.00135 0.01644 0.00000 0.00000 0.00368 0.00368 0.00000 0.00086 0.00086 — 3.71374 3.71374 0.00017 0.00014 0.00565 3.76380 Vendor 0.00005 0.00002 0.00079 0.00037 < 0.0000
05 0.00001 0.00019 0.00020 < 0.0000
05 0.00005 0.00006 — 0.68348 0.68348 0.00003 0.00010 0.00080 0.71404 Hauling 0.00027 0.00006 0.00471 0.00177 0.00003 0.00005 0.00101 0.00105 0.00005 0.00028 0.00032 — 3.72785 3.72785 0.00021 0.00060 0.00359 3.91408 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00021 0.00019 0.00025 0.00300 0.00000 0.00000 0.00067 0.00067 0.00000 0.00016 0.00016 — 0.61485 0.61485 0.00003 0.00002 0.00094 0.62314 Vendor 0.00001 < 0.0000
05 0.00014 0.00007 < 0.0000
05 < 0.0000
05 0.00003 0.00004 < 0.0000
05 0.00001 0.00001 — 0.11316 0.11316 < 0.0000
05 0.00002 0.00013 0.11822
Hauling 0.00005 0.00001 0.00086 0.00032 < 0.0000
05 0.00001 0.00018 0.00019 0.00001 0.00005 0.00006 — 0.61719 0.61719 0.00003 0.00010 0.00059 0.64802
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.80446 1.51624 13.0703 20.7726 0.02938 0.64983 — 0.64983 0.59784 — 0.59784 — 3,181.87 3,181.87 0.12907 0.02581 — 3,192.79 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
10 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00494 0.00415 0.03581 0.05691 0.00008 0.00178 — 0.00178 0.00164 — 0.00164 — 8.71745 8.71745 0.00035 0.00007 — 8.74737 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00090 0.00076 0.00654 0.01039 0.00001 0.00032 — 0.00032 0.00030 — 0.00030 — 1.44327 1.44327 0.00006 0.00001 — 1.44823 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.22441 0.19881 0.20953 3.48756 0.00000 0.00000 0.70583 0.70583 0.00000 0.16545 0.16545 — 731.629 731.629 0.03036 0.02560 2.47547 742.491 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
11 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00061 0.00054 0.00070 0.00853 0.00000 0.00000 0.00191 0.00191 0.00000 0.00045 0.00045 — 1.92829 1.92829 0.00009 0.00007 0.00293 1.95428 Vendor 0.00002 0.00001 0.00040 0.00018 < 0.0000
05 < 0.0000
05 0.00009 0.00010 < 0.0000
05 0.00003 0.00003 — 0.34174 0.34174 0.00001 0.00005 0.00040 0.35702 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00011 0.00010 0.00013 0.00156 0.00000 0.00000 0.00035 0.00035 0.00000 0.00008 0.00008 — 0.31925 0.31925 0.00001 0.00001 0.00049 0.32355 Vendor < 0.0000
05 < 0.0000
05 0.00007 0.00003 < 0.0000
05 < 0.0000
05 0.00002 0.00002 < 0.0000
05 < 0.0000
05 0.00001 — 0.05658 0.05658 < 0.0000
05 0.00001 0.00007 0.05911
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
12 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
13 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
14 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Drainage,
Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
8/31/2026 9/1/2026 5.00000 2.00000 Main conduit installation, West Vault installation,
slurry backfill, and
shoring removal
Trenching Linear, Trenching 8/29/2026 8/31/2026 5.00000 1.000000 Potholing, saw cutting/ asphalt grinding, trench
excavation, and West
Vault excavation
5.2. Off-Road Equipment
5.2.1. Unmitigated
15 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Linear, Drainage,
Utilities, & Sub-Grade
Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Trenching Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Paving Equipment Diesel Average 1.000000 10.00000 89.0000 0.36000 Trenching Other Construction
Equipment
Diesel Average 3.00000 10.00000 82.0000 0.42000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeWorker 52.0000 18.5000 LDA,LDT1,LDT2 Linear, Drainage, Utilities, & SubGradeVendor 4.00000 10.2000 HHDT,MHDT Linear, Drainage, Utilities, & SubGradeHauling 10.00000 20.0000 HHDT Linear, Drainage, Utilities, & SubGradeOnsite truck — — HHDT Trenching Worker 54.0000 18.5000 LDA,LDT1,LDT2
Trenching Vendor 4.00000 10.2000 HHDT,MHDT
Trenching Hauling 0.00000 20.0000 HHDT
16 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Trenching Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Drainage, Utilities, &
Sub-Grade
0.00000 99.0000 0.01000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
5.7. Construction Paving
17 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
18 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
19 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction 20 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
21 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
Education 5.85928
Housing 41.3815
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
Median HI 91.35121263
Education —
22 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
2-parent households 26.03618632
Voting 66.04645194
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
23 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
24 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
Elderly 10.6
English Speaking 65.5
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
7.3. Overall Health & Equity Scores
25 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Construction activities at Area 6 anticipated take place over a 3-day period Construction: Off-Road Equipment Equipment list based on information provided by BALI 26 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Screen Justification
Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations, hauling trips are based on the import/export quantities and assume a haul capacity of 10 CY
8.4. Construction
8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeStart Date 9/1/2026 8/31/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeEnd Date 9/2/2026 9/1/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeWork Days per Phase 1.000000 2.00000 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeDescription — Main conduit installation, West Vault installation, slurry backfill, and
shoring removal
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeWorker One-Way Trips per Day 10.00000 52.0000 Linear, Drainage, Utilities, & SubGradeVendor One-Way Trips per Day 0.00000 4.00000 Linear, Drainage, Utilities, & SubGradeHauling One-Way Trips per Day 6.50000 10.00000 27 / 28
OBH Off-Site Improvements (Area 6) Detailed Report, 7/30/2026 Phase Name Trip Type Model Parameter Default Value New Value Trenching Worker One-Way Trips per Day 20.0000 54.0000
28 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 OBH Off-Site Improvements (Area 7) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
4. Operations Emissions Details
1 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
2 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.1. Construction Phases
8.4.6. Trips and VMT
3 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Area 7)
Construction Start Date 9/2/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
4 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 0.01000 Mile 0.01000 0.00000 — — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.03788 1.71880 13.4174 24.3267 0.03028 0.65163 0.95777 1.39168 0.59874 0.23519 0.77365 — 4,038.21 4,038.21 0.16461 0.19678 4.70441 4,065.76 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.01436 0.01200 0.09270 0.16927 0.00023 0.00425 0.00660 0.01084 0.00390 0.00158 0.00548 — 31.0007 31.0007 0.00132 0.00092 0.01222 31.3196 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00262 0.00219 0.01692 0.03089 0.00004 0.00077 0.00120 0.00198 0.00071 0.00029 0.00100 — 5.13252 5.13252 0.00022 0.00015 0.00202 5.18531
2.2. Construction Emissions by Year
5 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.03788 1.71880 13.4174 24.3267 0.03028 0.65163 0.95777 1.39168 0.59874 0.23519 0.77365 — 4,038.21 4,038.21 0.16461 0.19678 4.70441 4,065.76 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.01436 0.01200 0.09270 0.16927 0.00023 0.00425 0.00660 0.01084 0.00390 0.00158 0.00548 — 31.0007 31.0007 0.00132 0.00092 0.01222 31.3196 Annual — — — — — — — — — — — — — — — — — —
2026 0.00262 0.00219 0.01692 0.03089 0.00004 0.00077 0.00120 0.00198 0.00071 0.00029 0.00100 — 5.13252 5.13252 0.00022 0.00015 0.00202 5.18531
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.80446 1.51624 13.0703 20.7726 0.02938 0.64983 0.00284 0.64983 0.59784 0.00043 0.59784 — 3,181.87 3,181.87 0.12907 0.02581 0.00000 3,192.79 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
6 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.01230 0.01034 0.08637 0.14228 0.00020 0.00420 0.00001 0.00421 0.00386 < 0.0000 05 0.00386 — 21.8389 21.8389 0.00089 0.00018 0.00000 21.9139 Annual — — — — — — — — — — — — — — — — — —
2026 0.00225 0.00189 0.01576 0.02597 0.00004 0.00077 < 0.0000 05 0.00077 0.00071 < 0.0000
05 0.00071 — 3.61569 3.61569 0.00015 0.00003 0.00000 3.62809
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.28902 0.20923 1.40255 3.84362 0.00692 0.01326 0.95493 0.96820 0.01236 0.23476 0.24712 — 1,713.52 1,713.52 0.08343 0.18374 4.70441 1,775.06 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00206 0.00166 0.00633 0.02699 0.00002 0.00005 0.00659 0.00664 0.00004 0.00158 0.00162 — 9.16178 9.16178 0.00043 0.00074 0.01222 9.40569 Annual — — — — — — — — — — — — — — — — — —
2026 0.00038 0.00030 0.00116 0.00493 < 0.0000
05 0.00001 0.00120 0.00121 0.00001 0.00029 0.00030 — 1.51684 1.51684 0.00007 0.00012 0.00202 1.55722
3. Construction Emissions Details
7 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.88141 0.74063 5.38445 10.3872 0.01484 0.23297 — 0.23297 0.21433 — 0.21433 — 1,607.48 1,607.48 0.06521 0.01304 — 1,612.99 Dust
From
Material
Moveme
nt
— — — — — — 0.00284 0.00284 — 0.00043 0.00043 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00241 0.00203 0.01475 0.02846 0.00004 0.00064 — 0.00064 0.00059 — 0.00059 — 4.40404 4.40404 0.00018 0.00004 — 4.41916 Dust
From
Material
Moveme
nt
— — — — — — 0.00001 0.00001 — < 0.0000
05 < 0.0000
05 — — — — — — —
8 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00044 0.00037 0.00269 0.00519 0.00001 0.00012 — 0.00012 0.00011 — 0.00011 — 0.72914 0.72914 0.00003 0.00001 — 0.73164 Dust
From
Material
Moveme
nt
— — — — — — < 0.0000
05 < 0.0000
05 — < 0.0000
05 < 0.0000
05 — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21610 0.19145 0.20177 3.35839 0.00000 0.00000 0.67969 0.67969 0.00000 0.15932 0.15932 — 704.532 704.532 0.02923 0.02465 2.38379 714.991 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.06391 0.01404 1.06329 0.41872 0.00602 0.01146 0.24102 0.25248 0.01146 0.06599 0.07745 — 884.276 884.276 0.04901 0.14129 1.98362 929.590 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
9 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00059 0.00052 0.00068 0.00822 0.00000 0.00000 0.00184 0.00184 0.00000 0.00043 0.00043 — 1.85687 1.85687 0.00008 0.00007 0.00283 1.88190 Vendor 0.00002 0.00001 0.00040 0.00018 < 0.0000
05 < 0.0000
05 0.00009 0.00010 < 0.0000
05 0.00003 0.00003 — 0.34174 0.34174 0.00001 0.00005 0.00040 0.35702 Hauling 0.00017 0.00004 0.00306 0.00115 0.00002 0.00003 0.00065 0.00069 0.00003 0.00018 0.00021 — 2.42310 2.42310 0.00013 0.00039 0.00234 2.54415 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00011 0.00009 0.00012 0.00150 0.00000 0.00000 0.00034 0.00034 0.00000 0.00008 0.00008 — 0.30743 0.30743 0.00001 0.00001 0.00047 0.31157 Vendor < 0.0000
05 < 0.0000
05 0.00007 0.00003 < 0.0000
05 < 0.0000
05 0.00002 0.00002 < 0.0000
05 < 0.0000
05 0.00001 — 0.05658 0.05658 < 0.0000
05 0.00001 0.00007 0.05911
Hauling 0.00003 0.00001 0.00056 0.00021 < 0.0000
05 0.00001 0.00012 0.00013 0.00001 0.00003 0.00004 — 0.40117 0.40117 0.00002 0.00006 0.00039 0.42121
3.2. Trenching (2026)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.80446 1.51624 13.0703 20.7726 0.02938 0.64983 — 0.64983 0.59784 — 0.59784 — 3,181.87 3,181.87 0.12907 0.02581 — 3,192.79 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
10 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00989 0.00831 0.07162 0.11382 0.00016 0.00356 — 0.00356 0.00328 — 0.00328 — 17.4349 17.4349 0.00071 0.00014 — 17.4947 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00180 0.00152 0.01307 0.02077 0.00003 0.00065 — 0.00065 0.00060 — 0.00060 — 2.88655 2.88655 0.00012 0.00002 — 2.89645 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.22441 0.19881 0.20953 3.48756 0.00000 0.00000 0.70583 0.70583 0.00000 0.16545 0.16545 — 731.629 731.629 0.03036 0.02560 2.47547 742.491 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
11 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00122 0.00108 0.00140 0.01707 0.00000 0.00000 0.00382 0.00382 0.00000 0.00089 0.00089 — 3.85658 3.85658 0.00017 0.00014 0.00587 3.90857 Vendor 0.00005 0.00002 0.00079 0.00037 < 0.0000
05 0.00001 0.00019 0.00020 < 0.0000
05 0.00005 0.00006 — 0.68348 0.68348 0.00003 0.00010 0.00080 0.71404 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00022 0.00020 0.00026 0.00311 0.00000 0.00000 0.00070 0.00070 0.00000 0.00016 0.00016 — 0.63850 0.63850 0.00003 0.00002 0.00097 0.64711 Vendor 0.00001 < 0.0000
05 0.00014 0.00007 < 0.0000
05 < 0.0000
05 0.00003 0.00004 < 0.0000
05 0.00001 0.00001 — 0.11316 0.11316 < 0.0000
05 0.00002 0.00013 0.11822
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
12 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
13 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
14 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Drainage,
Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
9/4/2026 9/4/2026 5.00000 1.000000 Main conduit installation, West Vault installation,
slurry backfill, and
shoring removal
Trenching Linear, Trenching 9/2/2026 9/3/2026 5.00000 2.00000 Potholing, saw cutting/ asphalt grinding, trench
excavation, and West
Vault excavation
5.2. Off-Road Equipment
5.2.1. Unmitigated
15 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Linear, Drainage,
Utilities, & Sub-Grade
Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Trenching Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Paving Equipment Diesel Average 1.000000 10.00000 89.0000 0.36000 Trenching Other Construction
Equipment
Diesel Average 3.00000 10.00000 82.0000 0.42000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeWorker 52.0000 18.5000 LDA,LDT1,LDT2 Linear, Drainage, Utilities, & SubGradeVendor 4.00000 10.2000 HHDT,MHDT Linear, Drainage, Utilities, & SubGradeHauling 13.0000 20.0000 HHDT Linear, Drainage, Utilities, & SubGradeOnsite truck — — HHDT Trenching Worker 54.0000 18.5000 LDA,LDT1,LDT2
Trenching Vendor 4.00000 10.2000 HHDT,MHDT
Trenching Hauling 0.00000 20.0000 HHDT
16 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Trenching Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Drainage, Utilities, &
Sub-Grade
55.0000 70.0000 0.01000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
5.7. Construction Paving
17 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
18 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
19 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction 20 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
21 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
Education 5.85928
Housing 41.3815
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
Median HI 91.35121263
Education —
22 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
2-parent households 26.03618632
Voting 66.04645194
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
23 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
24 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
Elderly 10.6
English Speaking 65.5
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
7.3. Overall Health & Equity Scores
25 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Construction activities at Area 7 anticipated take place over a 3-day period Construction: Off-Road Equipment Equipment list based on information provided by BALI 26 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Screen Justification
Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations, hauling trips are based on the import/export quantities and assume a haul capacity of 10 CY
8.4. Construction
8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeStart Date 9/5/2026 9/4/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeEnd Date 9/6/2026 9/4/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeDescription — Main conduit installation, West Vault installation, slurry backfill, and
shoring removal
Linear, Trenching Trenching Start Date 9/1/2026 9/2/2026 Linear, Trenching Trenching End Date 9/2/2026 9/3/2026
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeWorker One-Way Trips per Day 10.00000 52.0000 Linear, Drainage, Utilities, & SubGradeVendor One-Way Trips per Day 0.00000 4.00000 Linear, Drainage, Utilities, & SubGradeHauling One-Way Trips per Day 16.0000 13.0000 27 / 28
OBH Off-Site Improvements (Area 7) Detailed Report, 7/30/2026 Phase Name Trip Type Model Parameter Default Value New Value Trenching Worker One-Way Trips per Day 20.0000 54.0000
28 / 28
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 OBH Off-Site Improvements (Area 8) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
3.2. Paving (2026)
3.2.1. Onsite - Unmitigated
3.2.2. Offsite - Unmitigated
3.3. Trenching (2026)
1 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026
3.3.1. Onsite - Unmitigated
3.3.2. Offsite - Unmitigated
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
2 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.1. Construction Phases
3 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026
8.4.2. Off-Road Equipment
8.4.6. Trips and VMT
4 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Area 8)
Construction Start Date 9/5/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
5 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 0.09000 Mile 0.05000 0.00000 — — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.58947 2.16086 16.5477 30.5874 0.03861 0.72084 1.87430 2.35505 0.66229 0.44940 1.05182 — 5,833.72 5,833.72 0.24732 0.22298 7.90020 5,910.09 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.01770 0.01480 0.10549 0.20488 0.00025 0.00442 0.01215 0.01657 0.00406 0.00290 0.00696 — 39.6971 39.6971 0.00171 0.00141 0.02203 40.1825 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00323 0.00270 0.01925 0.03739 0.00005 0.00081 0.00222 0.00302 0.00074 0.00053 0.00127 — 6.57231 6.57231 0.00028 0.00023 0.00365 6.65266
2.2. Construction Emissions by Year
6 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.58947 2.16086 16.5477 30.5874 0.03861 0.72084 1.87430 2.35505 0.66229 0.44940 1.05182 — 5,833.72 5,833.72 0.24732 0.22298 7.90020 5,910.09 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.01770 0.01480 0.10549 0.20488 0.00025 0.00442 0.01215 0.01657 0.00406 0.00290 0.00696 — 39.6971 39.6971 0.00171 0.00141 0.02203 40.1825 Annual — — — — — — — — — — — — — — — — — —
2026 0.00323 0.00270 0.01925 0.03739 0.00005 0.00081 0.00222 0.00302 0.00074 0.00053 0.00127 — 6.57231 6.57231 0.00028 0.00023 0.00365 6.65266
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.08669 1.75340 15.1253 23.3186 0.03265 0.70930 0.00108 0.71038 0.65256 0.00016 0.65272 — 3,535.96 3,535.96 0.14343 0.02869 0.00000 3,548.09 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
7 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.01390 0.01168 0.09495 0.15445 0.00022 0.00435 0.00001 0.00435 0.00400 < 0.0000 05 0.00400 — 23.5075 23.5075 0.00095 0.00019 0.00000 23.5881 Annual — — — — — — — — — — — — — — — — — —
2026 0.00254 0.00213 0.01733 0.02819 0.00004 0.00079 < 0.0000 05 0.00079 0.00073 < 0.0000
05 0.00073 — 3.89193 3.89193 0.00016 0.00003 0.00000 3.90529
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.58209 0.47560 1.56101 8.46463 0.00642 0.01243 1.87322 1.88565 0.01019 0.44923 0.45942 — 2,604.00 2,604.00 0.11660 0.20108 7.90020 2,674.74 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00381 0.00312 0.01054 0.05043 0.00004 0.00007 0.01214 0.01221 0.00006 0.00290 0.00296 — 16.1896 16.1896 0.00075 0.00122 0.02203 16.5943 Annual — — — — — — — — — — — — — — — — — —
2026 0.00069 0.00057 0.00192 0.00920 0.00001 0.00001 0.00222 0.00223 0.00001 0.00053 0.00054 — 2.68038 2.68038 0.00012 0.00020 0.00365 2.74738
3. Construction Emissions Details
8 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026
3.1. Linear, Drainage, Utilities, & Sub-Grade (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.28223 0.23715 2.05499 2.54594 0.00327 0.05947 — 0.05947 0.05471 — 0.05471 — 354.087 354.087 0.01436 0.00287 — 355.302 Dust
From
Material
Moveme
nt
— — — — — — 0.00108 0.00108 — 0.00016 0.00016 — — — — — — — Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00155 0.00130 0.01126 0.01395 0.00002 0.00033 — 0.00033 0.00030 — 0.00030 — 1.94020 1.94020 0.00008 0.00002 — 1.94686 Dust
From
Material
Moveme
nt
— — — — — — 0.00001 0.00001 — < 0.0000
05 < 0.0000
05 — — — — — — —
9 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00028 0.00024 0.00205 0.00255 < 0.0000
05 0.00006 — 0.00006 0.00005 — 0.00005 — 0.32122 0.32122 0.00001 < 0.0000 05 — 0.32232
Dust
From
Material
Moveme
nt
— — — — — — < 0.0000
05 < 0.0000
05 — < 0.0000
05 < 0.0000
05 — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.21610 0.19145 0.20177 3.35839 0.00000 0.00000 0.67969 0.67969 0.00000 0.15932 0.15932 — 704.532 704.532 0.02923 0.02465 2.38379 714.991 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.04425 0.00972 0.73612 0.28989 0.00417 0.00794 0.16686 0.17480 0.00794 0.04568 0.05362 — 612.191 612.191 0.03393 0.09782 1.37328 643.562 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
10 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00118 0.00104 0.00135 0.01644 0.00000 0.00000 0.00368 0.00368 0.00000 0.00086 0.00086 — 3.71374 3.71374 0.00017 0.00014 0.00565 3.76380 Vendor 0.00005 0.00002 0.00079 0.00037 < 0.0000
05 0.00001 0.00019 0.00020 < 0.0000
05 0.00005 0.00006 — 0.68348 0.68348 0.00003 0.00010 0.00080 0.71404 Hauling 0.00024 0.00005 0.00424 0.00159 0.00002 0.00004 0.00091 0.00095 0.00004 0.00025 0.00029 — 3.35507 3.35507 0.00019 0.00054 0.00323 3.52267 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00021 0.00019 0.00025 0.00300 0.00000 0.00000 0.00067 0.00067 0.00000 0.00016 0.00016 — 0.61485 0.61485 0.00003 0.00002 0.00094 0.62314 Vendor 0.00001 < 0.0000
05 0.00014 0.00007 < 0.0000
05 < 0.0000
05 0.00003 0.00004 < 0.0000
05 0.00001 0.00001 — 0.11316 0.11316 < 0.0000
05 0.00002 0.00013 0.11822
Hauling 0.00004 0.00001 0.00077 0.00029 < 0.0000
05 0.00001 0.00017 0.00017 0.00001 0.00005 0.00005 — 0.55547 0.55547 0.00003 0.00009 0.00054 0.58322
3.2. Paving (2026)
3.2.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.35159 1.13571 8.73862 15.2554 0.02165 0.40885 — 0.40885 0.37614 — 0.37614 — 2,345.09 2,345.09 0.09513 0.01903 — 2,353.14 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
11 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00741 0.00622 0.04788 0.08359 0.00012 0.00224 — 0.00224 0.00206 — 0.00206 — 12.8498 12.8498 0.00052 0.00010 — 12.8939 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00135 0.00114 0.00874 0.01526 0.00002 0.00041 — 0.00041 0.00038 — 0.00038 — 2.12743 2.12743 0.00009 0.00002 — 2.13473 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.2.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.29921 0.26508 0.27937 4.65008 0.00000 0.00000 0.94111 0.94111 0.00000 0.22059 0.22059 — 975.505 975.505 0.04048 0.03413 3.30063 989.988 Vendor 0.01352 0.00561 0.20625 0.09976 0.00135 0.00270 0.05134 0.05403 0.00135 0.01418 0.01553 — 187.063 187.063 0.00778 0.02669 0.50550 195.718 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
12 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00163 0.00144 0.00187 0.02276 0.00000 0.00000 0.00509 0.00509 0.00000 0.00119 0.00119 — 5.14211 5.14211 0.00023 0.00019 0.00782 5.21142 Vendor 0.00007 0.00003 0.00119 0.00055 0.00001 0.00001 0.00028 0.00029 0.00001 0.00008 0.00008 — 1.02522 1.02522 0.00004 0.00015 0.00119 1.07107 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00030 0.00026 0.00034 0.00415 0.00000 0.00000 0.00093 0.00093 0.00000 0.00022 0.00022 — 0.85133 0.85133 0.00004 0.00003 0.00130 0.86281 Vendor 0.00001 0.00001 0.00022 0.00010 < 0.0000
05 < 0.0000
05 0.00005 0.00005 < 0.0000
05 0.00001 0.00002 — 0.16974 0.16974 0.00001 0.00002 0.00020 0.17733 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3. Trenching (2026)
3.3.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.80446 1.51624 13.0703 20.7726 0.02938 0.64983 — 0.64983 0.59784 — 0.59784 — 3,181.87 3,181.87 0.12907 0.02581 — 3,192.79 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
13 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00494 0.00415 0.03581 0.05691 0.00008 0.00178 — 0.00178 0.00164 — 0.00164 — 8.71745 8.71745 0.00035 0.00007 — 8.74737 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00090 0.00076 0.00654 0.01039 0.00001 0.00032 — 0.00032 0.00030 — 0.00030 — 1.44327 1.44327 0.00006 0.00001 — 1.44823 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.3.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.22441 0.19881 0.20953 3.48756 0.00000 0.00000 0.70583 0.70583 0.00000 0.16545 0.16545 — 731.629 731.629 0.03036 0.02560 2.47547 742.491 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
14 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Worker 0.00061 0.00054 0.00070 0.00853 0.00000 0.00000 0.00191 0.00191 0.00000 0.00045 0.00045 — 1.92829 1.92829 0.00009 0.00007 0.00293 1.95428 Vendor 0.00002 0.00001 0.00040 0.00018 < 0.0000
05 < 0.0000
05 0.00009 0.00010 < 0.0000
05 0.00003 0.00003 — 0.34174 0.34174 0.00001 0.00005 0.00040 0.35702 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00011 0.00010 0.00013 0.00156 0.00000 0.00000 0.00035 0.00035 0.00000 0.00008 0.00008 — 0.31925 0.31925 0.00001 0.00001 0.00049 0.32355 Vendor < 0.0000
05 < 0.0000
05 0.00007 0.00003 < 0.0000
05 < 0.0000
05 0.00002 0.00002 < 0.0000
05 < 0.0000
05 0.00001 — 0.05658 0.05658 < 0.0000
05 0.00001 0.00007 0.05911
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
15 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
16 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
17 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Drainage,
Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
9/7/2026 9/8/2026 5.00000 2.00000 Main conduit installation, West Vault installation,
slurry backfill, and
shoring removal
Paving Linear, Paving 9/8/2026 9/9/2026 5.00000 2.00000 — Trenching Linear, Trenching 9/5/2026 9/7/2026 5.00000 1.000000 Potholing, saw cutting/ asphalt grinding, trench
excavation, and West
Vault excavation
5.2. Off-Road Equipment
5.2.1. Unmitigated
18 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Drainage,
Utilities, & Sub-Grade
Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Paving Pavers Diesel Average 1.000000 10.00000 81.0000 0.42000 Paving Rollers Diesel Average 1.000000 10.00000 36.0000 0.38000 Paving Sweepers/Scrubbers Diesel Average 1.000000 10.00000 36.0000 0.46000 Paving Skid Steer Loaders Diesel Average 1.000000 10.00000 71.0000 0.37000 Paving Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Excavators Diesel Average 2.00000 10.00000 36.0000 0.38000 Trenching Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Trenching Paving Equipment Diesel Average 1.000000 10.00000 89.0000 0.36000 Trenching Other Construction
Equipment
Diesel Average 3.00000 10.00000 82.0000 0.42000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeWorker 52.0000 18.5000 LDA,LDT1,LDT2 Linear, Drainage, Utilities, & SubGradeVendor 4.00000 10.2000 HHDT,MHDT Linear, Drainage, Utilities, & SubGradeHauling 9.00000 20.0000 HHDT 19 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Drainage, Utilities, & SubGradeOnsite truck — — HHDT Paving Worker 72.0000 18.5000 LDA,LDT1,LDT2
Paving Vendor 6.00000 10.2000 HHDT,MHDT
Paving Hauling 0.00000 20.0000 HHDT
Paving Onsite truck — — HHDT
Trenching Worker 54.0000 18.5000 LDA,LDT1,LDT2
Trenching Vendor 4.00000 10.2000 HHDT,MHDT
Trenching Hauling 0.00000 20.0000 HHDT
Trenching Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
20 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Phase Name Material Imported (Cubic
Yards)
Material Exported (Cubic
Yards)
Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Drainage, Utilities, &
Sub-Grade
25.0000 70.0000 0.05000 0.00000 0.00000
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
21 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
22 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
23 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
24 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
Education 5.85928
Housing 41.3815
25 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
Median HI 91.35121263
Education —
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
2-parent households 26.03618632
Voting 66.04645194
26 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
27 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
Elderly 10.6
English Speaking 65.5
28 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Indicator Result for Project Census Tract
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
29 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Construction activities at Area 8 anticipated take place over a 5-day period (this does not include paving or striping of entire project site)
Construction: Off-Road Equipment Equipment list based on information provided by BALI Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations, hauling trips are based on the import/export quantities and assume a haul capacity of 10 CY
8.4. Construction
8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeStart Date 9/10/2026 9/7/2026 30 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Phase Type Phase Name Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeEnd Date 9/12/2026 9/8/2026 Linear, Drainage, Utilities, & SubGradeLinear, Drainage, Utilities, & SubGradeDescription — Main conduit installation, West Vault installation, slurry backfill, and
shoring removal
Linear, Paving Paving Start Date 9/9/2026 9/8/2026
Linear, Paving Paving End Date 9/10/2026 9/9/2026
Linear, Trenching Trenching Start Date 9/4/2026 9/5/2026 Linear, Trenching Trenching End Date 9/4/2026 9/7/2026
8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New Value Paving Pavers Number per Day 0.00000 1.000000
Paving Pavers Hours Per Day 8.00000 10.00000
Paving Rollers Number per Day 0.00000 1.000000
Paving Rollers Hours Per Day 8.00000 10.00000
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeWorker One-Way Trips per Day 5.00000 52.0000 Linear, Drainage, Utilities, & SubGradeVendor One-Way Trips per Day 0.00000 4.00000 31 / 32
OBH Off-Site Improvements (Area 8) Detailed Report, 7/30/2026 Phase Name Trip Type Model Parameter Default Value New Value Linear, Drainage, Utilities, & SubGradeHauling One-Way Trips per Day 6.00000 9.00000 Paving Worker One-Way Trips per Day 15.0000 72.0000
Paving Vendor One-Way Trips per Day 0.00000 6.00000
Trenching Worker One-Way Trips per Day 20.0000 54.0000
32 / 32
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 OBH Off-Site Improvements (Total Site Paving) Detailed Report Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Paving (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 1 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
2 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.2. Off-Road Equipment
8.4.6. Trips and VMT
3 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Total Site Paving) Construction Start Date 9/10/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
4 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 0.15000 Mile 0.09000 0.00000 — — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.12336 1.78985 13.3290 24.5515 0.03040 0.65164 0.83559 1.48723 0.59837 0.19801 0.79638 — 4,146.17 4,146.17 0.16913 0.08066 3.25603 4,177.69 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.02907 0.02448 0.18344 0.33067 0.00042 0.00893 0.01130 0.02023 0.00820 0.00268 0.01087 — 56.3742 56.3742 0.00233 0.00110 0.01929 56.7811 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00530 0.00447 0.03348 0.06035 0.00008 0.00163 0.00206 0.00369 0.00150 0.00049 0.00198 — 9.33339 9.33339 0.00039 0.00018 0.00319 9.40076
2.2. Construction Emissions by Year
5 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.12336 1.78985 13.3290 24.5515 0.03040 0.65164 0.83559 1.48723 0.59837 0.19801 0.79638 — 4,146.17 4,146.17 0.16913 0.08066 3.25603 4,177.69 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.02907 0.02448 0.18344 0.33067 0.00042 0.00893 0.01130 0.02023 0.00820 0.00268 0.01087 — 56.3742 56.3742 0.00233 0.00110 0.01929 56.7811 Annual — — — — — — — — — — — — — — — — — —
2026 0.00530 0.00447 0.03348 0.06035 0.00008 0.00163 0.00206 0.00369 0.00150 0.00049 0.00198 — 9.33339 9.33339 0.00039 0.00018 0.00319 9.40076
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 1.86050 1.56334 12.8899 20.5766 0.02905 0.64894 0.00000 0.64894 0.59702 0.00000 0.59702 — 3,146.19 3,146.19 0.12762 0.02552 0.00000 3,156.98 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
6 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.02549 0.02142 0.17657 0.28187 0.00040 0.00889 0.00000 0.00889 0.00818 0.00000 0.00818 — 43.0984 43.0984 0.00175 0.00035 0.00000 43.2463 Annual — — — — — — — — — — — — — — — — — —
2026 0.00465 0.00391 0.03222 0.05144 0.00007 0.00162 0.00000 0.00162 0.00149 0.00000 0.00149 — 7.13544 7.13544 0.00029 0.00006 0.00000 7.15993
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.26286 0.22651 0.43906 3.97483 0.00135 0.00270 0.83559 0.83829 0.00135 0.19801 0.19936 — 999.984 999.984 0.04151 0.05513 3.25603 1,020.71 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00358 0.00306 0.00687 0.04880 0.00002 0.00004 0.01130 0.01134 0.00002 0.00268 0.00270 — 13.2758 13.2758 0.00059 0.00076 0.01929 13.5348 Annual — — — — — — — — — — — — — — — — — —
2026 0.00065 0.00056 0.00125 0.00891 < 0.0000
05 0.00001 0.00206 0.00207 < 0.0000
05 0.00049 0.00049 — 2.19796 2.19796 0.00010 0.00013 0.00319 2.24084
3. Construction Emissions Details
7 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
3.1. Paving (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
1.86050 1.56334 12.8899 20.5766 0.02905 0.64894 — 0.64894 0.59702 — 0.59702 — 3,146.19 3,146.19 0.12762 0.02552 — 3,156.98 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.02549 0.02142 0.17657 0.28187 0.00040 0.00889 — 0.00889 0.00818 — 0.00818 — 43.0984 43.0984 0.00175 0.00035 — 43.2463 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00465 0.00391 0.03222 0.05144 0.00007 0.00162 — 0.00162 0.00149 — 0.00149 — 7.13544 7.13544 0.00029 0.00006 — 7.15993 Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 8 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.24934 0.22090 0.23281 3.87507 0.00000 0.00000 0.78426 0.78426 0.00000 0.18383 0.18383 — 812.921 812.921 0.03373 0.02844 2.75053 824.990 Vendor 0.01352 0.00561 0.20625 0.09976 0.00135 0.00270 0.05134 0.05403 0.00135 0.01418 0.01553 — 187.063 187.063 0.00778 0.02669 0.50550 195.718 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00340 0.00299 0.00390 0.04741 0.00000 0.00000 0.01061 0.01061 0.00000 0.00248 0.00248 — 10.7127 10.7127 0.00048 0.00039 0.01630 10.8571 Vendor 0.00018 0.00008 0.00297 0.00138 0.00002 0.00004 0.00070 0.00073 0.00002 0.00019 0.00021 — 2.56305 2.56305 0.00011 0.00037 0.00299 2.67767 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00062 0.00055 0.00071 0.00865 0.00000 0.00000 0.00194 0.00194 0.00000 0.00045 0.00045 — 1.77361 1.77361 0.00008 0.00006 0.00270 1.79752 Vendor 0.00003 0.00001 0.00054 0.00025 < 0.0000
05 0.00001 0.00013 0.00013 < 0.0000
05 0.00004 0.00004 — 0.42434 0.42434 0.00002 0.00006 0.00049 0.44332 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
9 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
10 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
11 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Paving Linear, Paving 9/10/2026 9/16/2026 5.00000 5.00000 — 12 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Paving Pavers Diesel Average 1.000000 10.00000 81.0000 0.42000 Paving Rollers Diesel Average 1.000000 10.00000 36.0000 0.38000 Paving Sweepers/Scrubbers Diesel Average 1.000000 10.00000 36.0000 0.46000 Paving Skid Steer Loaders Diesel Average 1.000000 10.00000 71.0000 0.37000 Paving Rubber Tired Loaders Diesel Average 2.00000 10.00000 150.000 0.36000 Paving Other Construction
Equipment
Diesel Average 2.00000 10.00000 82.0000 0.42000
5.3. Construction Vehicles
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Paving Worker 60.0000 18.5000 LDA,LDT1,LDT2
Paving Vendor 6.00000 10.2000 HHDT,MHDT
Paving Hauling 0.00000 20.0000 HHDT
Paving Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
13 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
14 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures 15 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
16 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. 17 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
Education 5.85928
18 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Indicator Result for Project Census Tract
Housing 41.3815
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
Median HI 91.35121263
Education —
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
2-parent households 26.03618632
19 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Indicator Result for Project Census Tract
Voting 66.04645194
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
20 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Indicator Result for Project Census Tract
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
Elderly 10.6
21 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Indicator Result for Project Census Tract
English Speaking 65.5
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state. 22 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Total site paving
Construction: Off-Road Equipment Equipment list based on information provided by BALI Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations, hauling trips are based on the import/export quantities and assume a haul capacity of 10 CY, trip length for hauling activity has been adjusted assuming a location in Downtown LA or Gardena.
8.4. Construction
8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New Value Paving Pavers Number per Day 0.00000 1.000000
23 / 24
OBH Off-Site Improvements (Total Site Paving) Detailed Report, 7/31/2026 Phase Name Equipment Type Model Parameter Default Value New Value Paving Pavers Hours Per Day 8.00000 10.00000
Paving Rollers Number per Day 0.00000 1.000000
Paving Rollers Hours Per Day 8.00000 10.00000
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Paving Worker One-Way Trips per Day 20.0000 60.0000
Paving Vendor One-Way Trips per Day 0.00000 6.00000
24 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 OBH Off-Site Improvements (Striping) Detailed Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated
2.2.2. Onsite Construction Emissions by Year, Unmitigated
2.2.3. Offsite Construction Emissions by Year, Unmitigated
3. Construction Emissions Details
3.1. Striping (2026)
3.1.1. Onsite - Unmitigated
3.1.2. Offsite - Unmitigated
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated 1 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
5.18.2. Sequestration
5.18.2.1. Unmitigated
2 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
6.2. Initial Climate Risk Scores
6.3. Adjusted Climate Risk Scores
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
7.2. Healthy Places Index Scores
7.3. Overall Health & Equity Scores
7.4. Health & Equity Measures
7.5. Evaluation Scorecard
7.6. Health & Equity Custom Measures
8. User Changes to Default Data
8.1. Justifications
8.4. Construction
8.4.2. Off-Road Equipment
8.4.6. Trips and VMT
3 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name OBH Off-Site Improvements (Striping)
Construction Start Date 9/17/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 19.6000
Location 34.06596955898915, -118.41126084323452
County Los Angeles-South Coast
City Beverly Hills
Air District South Coast AQMD
Air Basin South Coast
TAZ 4315
EDFZ 16
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.45
4 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Other Asphalt
Surfaces
0.09000 Acre 0.09000 0.00000 0.00000 — — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.72710 0.69727 0.73160 1.78956 0.00178 0.02225 0.32178 0.34404 0.01972 0.07686 0.09658 — 489.071 489.071 0.02024 0.02876 1.34553 499.493 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00398 0.00381 0.00415 0.00898 0.00001 0.00012 0.00174 0.00186 0.00011 0.00042 0.00052 — 2.61792 2.61792 0.00011 0.00016 0.00319 2.67091 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00073 0.00070 0.00076 0.00164 < 0.0000
05 0.00002 0.00032 0.00034 0.00002 0.00008 0.00010 — 0.43343 0.43343 0.00002 0.00003 0.00053 0.44220 5 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026
2.2. Construction Emissions by Year
2.2.1. Total Construction Emissions by Year, Unmitigated Includes both onsite and offsite emissions.
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.72710 0.69727 0.73160 1.78956 0.00178 0.02225 0.32178 0.34404 0.01972 0.07686 0.09658 — 489.071 489.071 0.02024 0.02876 1.34553 499.493 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00398 0.00381 0.00415 0.00898 0.00001 0.00012 0.00174 0.00186 0.00011 0.00042 0.00052 — 2.61792 2.61792 0.00011 0.00016 0.00319 2.67091 Annual — — — — — — — — — — — — — — — — — —
2026 0.00073 0.00070 0.00076 0.00164 < 0.0000
05 0.00002 0.00032 0.00034 0.00002 0.00008 0.00010 — 0.43343 0.43343 0.00002 0.00003 0.00053 0.44220
2.2.2. Onsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.62666 0.61254 0.50874 0.30219 0.00088 0.02045 0.00000 0.02045 0.01882 0.00000 0.01882 — 66.2913 66.2913 0.00269 0.00054 0.00000 66.5188 6 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00343 0.00336 0.00279 0.00166 < 0.0000
05 0.00011 0.00000 0.00011 0.00010 0.00000 0.00010 — 0.36324 0.36324 0.00001 < 0.0000 05 0.00000 0.36449
Annual — — — — — — — — — — — — — — — — — —
2026 0.00063 0.00061 0.00051 0.00030 < 0.0000
05 0.00002 0.00000 0.00002 0.00002 0.00000 0.00002 — 0.06014 0.06014 < 0.0000 05 < 0.0000
05 0.00000 0.06034
2.2.3. Offsite Construction Emissions by Year, Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily - S
ummer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.10044 0.08474 0.22286 1.48737 0.00090 0.00180 0.32178 0.32358 0.00090 0.07686 0.07776 — 422.780 422.780 0.01755 0.02822 1.34553 432.975 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
2026 0.00055 0.00046 0.00136 0.00732 < 0.0000
05 0.00001 0.00174 0.00175 < 0.0000
05 0.00042 0.00042 — 2.25468 2.25468 0.00010 0.00015 0.00319 2.30642 Annual — — — — — — — — — — — — — — — — — —
2026 0.00010 0.00008 0.00025 0.00134 < 0.0000
05 < 0.0000
05 0.00032 0.00032 < 0.0000
05 0.00008 0.00008 — 0.37329 0.37329 0.00002 0.00003 0.00053 0.38185 7 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026
3. Construction Emissions Details
3.1. Striping (2026)
3.1.1. Onsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.08137 0.06725 0.50874 0.30219 0.00088 0.02045 — 0.02045 0.01882 — 0.01882 — 66.2913 66.2913 0.00269 0.00054 — 66.5188 Architect
ural
Coatings
0.54529 0.54529 — — — — — — — — — — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00045 0.00037 0.00279 0.00166 < 0.0000
05 0.00011 — 0.00011 0.00010 — 0.00010 — 0.36324 0.36324 0.00001 < 0.0000 05 — 0.36449
Architect
ural
Coatings
0.00299 0.00299 — — — — — — — — — — — — — — — —
8 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
OffRoad Eq
uipment
0.00008 0.00007 0.00051 0.00030 < 0.0000
05 0.00002 — 0.00002 0.00002 — 0.00002 — 0.06014 0.06014 < 0.0000 05 < 0.0000
05 — 0.06034
Architect
ural
Coatings
0.00055 0.00055 — — — — — — — — — — — — — — — —
Onsite
truck
0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
3.1.2. Offsite - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.09143 0.08100 0.08536 1.42086 0.00000 0.00000 0.28756 0.28756 0.00000 0.06740 0.06740 — 298.071 298.071 0.01237 0.01043 1.00853 302.496 Vendor 0.00901 0.00374 0.13750 0.06651 0.00090 0.00180 0.03422 0.03602 0.00090 0.00946 0.01035 — 124.709 124.709 0.00519 0.01780 0.33700 130.478 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00050 0.00044 0.00057 0.00695 0.00000 0.00000 0.00156 0.00156 0.00000 0.00036 0.00036 — 1.57120 1.57120 0.00007 0.00006 0.00239 1.59238 9 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Vendor 0.00005 0.00002 0.00079 0.00037 < 0.0000
05 0.00001 0.00019 0.00020 < 0.0000
05 0.00005 0.00006 — 0.68348 0.68348 0.00003 0.00010 0.00080 0.71404 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00009 0.00008 0.00010 0.00127 0.00000 0.00000 0.00028 0.00028 0.00000 0.00007 0.00007 — 0.26013 0.26013 0.00001 0.00001 0.00040 0.26364 Vendor 0.00001 < 0.0000
05 0.00014 0.00007 < 0.0000
05 < 0.0000
05 0.00003 0.00004 < 0.0000
05 0.00001 0.00001 — 0.11316 0.11316 < 0.0000
05 0.00002 0.00013 0.11822
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000
4. Operations Emissions Details
4.10. Soil Carbon Accumulation By Vegetation Type
4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
10 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily, Su
mmer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
11 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
12 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Striping Architectural Coating 9/17/2026 9/18/2026 5.00000 2.00000 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Striping Air Compressors Diesel Average 2.00000 10.00000 5.50000 0.48000
5.3. Construction Vehicles
5.3.1. Unmitigated
13 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Striping Worker 22.0000 18.5000 LDA,LDT1,LDT2
Striping Vendor 4.00000 10.2000 HHDT,MHDT
Striping Hauling 0.00000 20.0000 HHDT
Striping Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.
5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior
Area Coated (sq ft)
Parking Area Coated (sq ft)
Striping 0.00000 0.00000 0.00000 0.00000 235.224
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
14 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 531.983 0.03300 0.00400
5.18. Vegetation
5.18.1. Land Use Change
5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres
5.18.1. Biomass Cover Type
5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres
5.18.2. Sequestration
5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year) 15 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026
6. Climate Risk Detailed Report
6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.
Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 7.73000 annual days of extreme heat Extreme Precipitation 7.05000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.30000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.
6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
16 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.
6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat N/A N/A N/A N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation N/A N/A N/A N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.
17 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.
The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.
6.4. Climate Risk Reduction Measures
7. Health and Equity Details
7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.
Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 55.3827
AQ-PM 69.4711
AQ-DPM 88.2763
Drinking Water 49.0821
Lead Risk Housing 62.9490
Pesticides 0.00000
Toxic Releases 74.6437
Traffic 65.7375
Effect Indicators —
CleanUp Sites 62.8966
18 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Indicator Result for Project Census Tract
Groundwater 0.00000
Haz Waste Facilities/Generators 81.8795
Impaired Water Bodies 0.00000
Solid Waste 59.1753
Sensitive Population —
Asthma 27.0065
Cardio-vascular 33.9232
Low Birth Weights 24.7626
Socioeconomic Factor Indicators —
Education 5.85928
Housing 41.3815
Linguistic 32.6431
Poverty 21.7211
Unemployment 62.4024
7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
Indicator Result for Project Census Tract
Economic —
Above Poverty 85.3586552
Employed 53.24008726
19 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Indicator Result for Project Census Tract
Median HI 91.35121263
Education —
Bachelor's or higher 97.89554729
High school enrollment 100
Preschool enrollment 95.7141024
Transportation —
Auto Access 59.70742974
Active commuting 63.5698704
Social —
2-parent households 26.03618632
Voting 66.04645194
Neighborhood —
Alcohol availability 40.15141794
Park access 34.58231746
Retail density 88.78480688
Supermarket access 78.69883229
Tree canopy 70.69164635
Housing —
Homeownership 29.61632234
Housing habitability 68.45887335
Low-inc homeowner severe housing cost burden 93.90478635 20 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Indicator Result for Project Census Tract
Low-inc renter severe housing cost burden 47.88913127
Uncrowded housing 83.16437829
Health Outcomes —
Insured adults 87.48877197
Arthritis 0.0
Asthma ER Admissions 94.2
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 96.8
Cognitively Disabled 76.7
Physically Disabled 69.8
Heart Attack ER Admissions 84.0
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 67.2
Physical Health Not Good 0.0
21 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Indicator Result for Project Census Tract
Stroke 0.0
Health Risk Behaviors —
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 84.9
Elderly 10.6
English Speaking 65.5
Foreign-born 51.6
Outdoor Workers 94.8
Climate Change Adaptive Capacity —
Impervious Surface Cover 27.4
Traffic Density 81.1
Traffic Access 87.4
Other Indices —
Hardship 7.4
Other Decision Support —
2016 Voting 57.0
22 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026
7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 38.0000 Healthy Places Index Score for Project Location (b) 88.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.
7.4. Health & Equity Measures
No Health & Equity Measures selected.
7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.
7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.
8. User Changes to Default Data
8.1. Justifications
Screen Justification
Construction: Construction Phases Striping activities
23 / 24
OBH Off-Site Improvements (Striping) Detailed Report, 7/31/2026 Screen Justification
Construction: Off-Road Equipment Equipment list based on information provided by BALI Construction: Trips and VMT Worker trips adjusted assuming maximum crew members on-site during each activity, vendor trips represent the utility truck operations
8.4. Construction
8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New Value Striping Air Compressors Number per Day 1.000000 2.00000 Striping Air Compressors Hours Per Day 6.00000 10.00000 Striping Air Compressors Horsepower 37.0000 5.50000
8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Striping Worker One-Way Trips per Day 0.00000 22.0000
24 / 24
Addendum #4 to the Final Supplemental Environmental Impact Report One Beverly Hills Overlay Specific Plan Project
EXHIBIT 4
One Beverly Hills Underground Electrical Infrastructure Extension Construction Noise and Vibration Impact Analysis
(Prepared by LSA, dated August 6, 2026)
CARLSBAD
CLOVIS
EMERYVILLE
IRVINE
LOS ANGELES
PALM SPRINGS
RIVERSIDE
ROSEVILLE
SAN LUIS OBISPO
3210 El Camino Real, Suite 100, Irvine, California 92602 949.553.0666 www.lsa.net
MEMORANDUM
DATE: August 6, 2026
TO: BriƩany KnoƩ, Cain Development, LP
FROM: Jason Lui, Associate/Senior Noise Specialist
SUBJECT: One Beverly Hills Underground Electrical Infrastructure Extension ConstrucƟon Noise and VibraƟon Impact Analysis (LSA Project No. 20263059)
INTRODUCTION
This ConstrucƟon Noise and VibraƟon Impact Analysis has been prepared subsequent to the construcƟon noise and vibraƟon impact analysis in the One Beverly Hills Overlay Specific Plan Final Supplemental Environmental Impact Report (FSEIR) (Rincon Consultants, Inc. 2021) to assess the potenƟal noise and vibraƟon impacts of the extension of underground electrical infrastructure within exisƟng public roadway rights-of-way on South Santa Monica Boulevard, from Charleville Boulevard to approximately 20 linear feet east of the Wilshire Boulevard intersecƟon, associated with the One Beverly Hills Project (project). All references cited in this assessment are provided in AƩachment A.
PROJECT LOCATION
The extension of the underground electrical infrastructure associated with the project is located within the exisƟng public roadway right-of-way on South Santa Monica Boulevard, from Charleville Boulevard approximately 20 linear feet east of the Wilshire Boulevard intersecƟon in Beverly Hills, California. Figure 1 shows the project locaƟon (all figures are provided in AƩachment B).
PROJECT DESCRIPTION
The proposed project consists of the extension of the underground electrical infrastructure within exisƟng public roadway rights-of-way, including the construcƟon of underground conduit systems, uƟlity vaults, vent lines, and associated street restoraƟon improvements. ConstrucƟon acƟviƟes would occur primarily along South Santa Monica Boulevard, the Wilshire Boulevard crossing, and Charleville Boulevard. Figure 2 shows the project construcƟon boundary.
The work would be completed over an approximately 39-day construcƟon period and would occur enƟrely within previously disturbed urban roadway corridors. Major construcƟon acƟviƟes include LSA
50 EI 9e
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 2 uƟlity potholing, saw cuƫng, asphalt milling and removal, trench excavaƟon, installaƟon of underground electrical conduits, construcƟon and placement of precast electrical vaults, installaƟon of vent line conduits, slurry backfilling, aggregate base placement, asphalt pavement restoraƟon, and final pavement striping. Temporary traffic control measures would be implemented throughout construcƟon, with steel trench plates installed at the end of each workday to maintain vehicular access where excavaƟons remain open.
ConstrucƟon would begin with uƟlity potholing and conflict idenƟficaƟon using hydro-vacuum excavaƟon equipment, followed by saw cuƫng and asphalt milling of exisƟng pavement surfaces.
ExcavaƟon acƟviƟes would include the removal of approximately 2,500 cubic yards of trench material and approximately 215 cubic yards of asphalt pavement. ExcavaƟons would support the installaƟon of approximately 795 linear feet of mainline electrical conduit within South Santa Monica Boulevard, associated vent line conduits, and two underground electrical vault structures.
Approximately, 50 linear feet of conduit would be installed in Charleville Boulevard north of South Santa Monica Boulevard.
Vault construcƟon would include excavaƟon, shoring installaƟon, placement of precast concrete vaults using hydraulic cranes, conduit connecƟons, and slurry backfill. Mainline conduit installaƟon would occur in mulƟple segments along South Santa Monica Boulevard, Charleville Boulevard, and the Wilshire Boulevard crossing. Vent line conduit installaƟons would be constructed adjacent to both vault locaƟons.
Backfill operaƟons would consist primarily of controlled low-strength material (CLSM) slurry placement, totaling approximately 1,100 cubic yards. Following uƟlity installaƟon, trench secƟons would be restored using crushed miscellaneous base and asphalt pavement. Approximately 68 cubic yards of aggregate base and 200 cubic yards of asphalt paving material would be imported and placed during roadway restoraƟon. Temporary pavement markings would be installed following paving operaƟons, with final lane striping completed aŌer the required asphalt curing period.
ConstrucƟon would require crews ranging from approximately 14 to 36 personnel per day, depending on the phase of work. Equipment anƟcipated during various phases of construcƟon includes hydraulic excavators, wheel loaders, hydro-vacuum excavaƟon trucks, asphalt milling machines, dump trucks, concrete mixer trucks, cranes, asphalt paving equipment, rollers, sweepers, water trucks, and pavement striping equipment.
Temporary impacts associated with construcƟon may include construcƟon-generated noise and vibraƟon. ConstrucƟon acƟviƟes would occur within developed urban transportaƟon corridors and would not introduce new permanent above-ground structures beyond standard uƟlity access features associated with underground electrical faciliƟes.
OperaƟonal impacts following construcƟon are expected to be minimal because the majority of the improvements would be located underground within exisƟng public rights-of-way.
LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 3
CHARACTERISTICS OF SOUND
Sound is a vibratory disturbance created by a moving or vibraƟng source, which is capable of being detected by the hearing organs (e.g., the human ear). Noise is usually defined as unwanted sound.
Noise consists of any sound that may produce physiological or psychological damage and/or interfere with communicaƟon, work, rest, recreaƟon, and sleep.
To the human ear, sound has two significant characterisƟcs: pitch and loudness. Pitch is generally an annoyance, while loudness can affect the ability to hear. Pitch is the number of complete vibraƟons (or cycles per second) of a wave, resulƟng in the tone’s range from high to low. Loudness is the strength of a sound, describes a noisy or quiet environment, and is measured by the amplitude of the sound wave. Loudness is determined by the intensity of the sound waves combined with the recepƟon characterisƟcs of the human ear. Sound intensity is the average rate of sound energy transmiƩed through a unit area perpendicular to the direcƟon in which the sound waves are traveling. This characterisƟc of sound can be precisely measured with instruments.
In the analysis of a project, the noise environment of the project area is defined in terms of sound intensity and its effect on adjacent sensiƟve land uses.
Measurement of Sound
Sound intensity is measured through the A-weighted scale to correct for the relaƟve frequency response of the human ear. That is, an A-weighted noise level de-emphasizes low and very high frequencies of sound similar to the human ear’s de-emphasis of these frequencies. Decibels (dB), unlike the linear scale (e.g., inches or pounds), is a scale based on powers of 10.
For example, 10 dB is 10 Ɵmes more intense than 0 dB, 20 dB is 100 Ɵmes more intense than 0 dB, and 30 dB is 1,000 Ɵmes more intense than 0 dB. Thirty decibels (30 dB) represents 1,000 Ɵmes as much acousƟc energy as 0 dB. The decibel scale increases as the square of the change, represenƟng the sound pressure energy. A sound as soŌ as human breathing is about 10 Ɵmes greater than 0 dB.
The decibel system of measuring sound gives a rough connecƟon between the physical intensity of sound and its perceived loudness to the human ear. A 10 dB increase in sound level is perceived by the human ear as only a doubling of the loudness of the sound. Ambient sounds generally range from 30 A-weighted decibels (dBA) (very quiet) to 100 dBA (very loud).
Sound levels generate from a source, and their decibel level decreases as the distance from that source increases. Sound dissipates exponenƟally with distance from the noise source. For a single point source, sound levels decrease approximately 6 dB for each doubling of distance from the source. This drop-off rate is appropriate for noise generated by staƟonary equipment. If noise is produced by a line source, such as highway traffic or railroad operaƟons, the sound decreases 3 dB for each doubling of distance in a hard site environment. Line source noise in a relaƟvely flat environment with absorpƟve vegetaƟon decreases 4.5 dB for each doubling of distance.
There are many ways to rate noise for various Ɵme periods, but an appropriate raƟng of ambient noise affecƟng humans also accounts for the annoying effects of sound. The equivalent conƟnuous sound level (Leq) is the total sound energy of Ɵme-weighted average noise over a sample period.
However, the predominant raƟng scales for human communiƟes in California are Leq and the Community Noise Equivalent Level (CNEL) or the day-night average noise level (Ldn) based on dBA.
LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 4 CNEL is the Ɵme-varying noise over a 24-hour period, with a 5 dBA weighƟng factor applied to the hourly Leq for noises occurring from 7:00 p.m. to 10:00 p.m. (defined as relaxaƟon hours) and a 10 dBA weighƟng factor applied to noises occurring from 10:00 p.m. to 7:00 a.m. (defined as sleeping hours). Ldn is similar to the CNEL scale but without the adjustment for events occurring during the relaxaƟon hours. CNEL and Ldn are within 1 dBA of each other and are normally interchangeable. The noise adjustments are added to the noise events occurring during the more sensiƟve hours.
Other noise raƟng scales of importance, when assessing the annoyance factor, include the maximum instantaneous noise level (Lmax), which is the highest exponenƟal Ɵme-averaged sound level that occurs during a stated Ɵme period. The noise environments discussed in this analysis are specified in terms of Lmax for short-term noise impacts. Lmax reflects peak operaƟng condiƟons and addresses the annoying aspects of intermiƩent noise. Another noise scale oŌen used together with Lmax in noise ordinances for enforcement purposes is noise standards in terms of percenƟle noise levels. For example, the L10 noise level represents the noise level exceeded 10 percent of the Ɵme during a stated period. The L50 noise level represents the median noise level; half the Ɵme the noise level exceeds this level and half the Ɵme it is less. The L90 noise level represents the noise level exceeded 90 percent of the Ɵme and is considered the background noise level during a monitoring period. For a relaƟvely constant noise source, Leq and L50 are approximately the same.
Noise impacts can be described in three categories. The first is audible impacts, which refer to increases in noise levels noƟceable to humans. Audible increases in noise levels generally refer to a change of 3 dB or greater since this level has been found to be barely percepƟble in exterior environments. The second category, potenƟally audible, refers to a change in the noise level between 1 dB and 3 dB. This range of noise levels has been found to be noƟceable only in laboratory environments. The last category is changes in noise levels of less than 1 dB, which are inaudible to the human ear. Only audible changes in exisƟng ambient or background noise levels are considered potenƟally significant.
Physiological Effects of Noise
Physical damage to human hearing begins at prolonged exposure to noise levels higher than 85 dBA.
Exposure to high noise levels affects the enƟre system, with prolonged noise exposure in excess of 75 dBA increasing body tensions and thereby affecƟng blood pressure and funcƟons of the heart and the nervous system. In comparison, extended periods of noise exposure above 90 dBA would result in permanent cell damage. When the noise level reaches 120 dBA, a Ɵckling sensaƟon occurs in the human ear, even with short-term exposure. This level of noise is called the threshold of feeling. As the sound reaches 140 dBA, the Ɵckling sensaƟon is replaced by the feeling of pain in the ear. This is called the threshold of pain. Sound levels from 160 to 165 dBA will potenƟally result in dizziness or loss of equilibrium. The ambient or background noise problem is widespread and generally more concentrated in urban areas than in outlying, less developed areas. Table A lists definiƟons of acousƟcal terms, and Table B shows common sound levels and their noise sources.
LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 5 Table A: DefiniƟons of AcousƟcal Terms
Term DefiniƟon
Decibel, dB A unit of noise level that denotes the raƟo between two quanƟƟes that are proporƟonal to power; the number of decibels is 10 Ɵmes the logarithm (to the base 10) of this raƟo.
Frequency, Hz Of a funcƟon periodic in Ɵme, the number of Ɵmes that the quanƟty repeats itself in 1 second (i.e., number of cycles per second).
A-Weighted Sound Level, dBA The sound level obtained by use of A-weighƟng. The A-weighƟng filter de-emphasizes the verylow-frequency and very-high-frequency components of the sound in a manner similar to the frequency response of the human ear and correlates well with subjecƟve reacƟons to noise. (All sound levels in this report are A-weighted unless reported otherwise.) L2, L8, L50, L90 The fast A-weighted noise levels that are equaled or exceeded by a fluctuaƟng sound level 2 percent, 8 percent, 50 percent, and 90 percent of a stated Ɵme period.
Equivalent ConƟnuous Sound
Level, Leq
The level of a steady sound that, in a stated Ɵme period and at a stated locaƟon, has the same A-weighted sound energy as the Ɵme-varying sound.
Community Noise Equivalent
Level, CNEL
The 24-hour A-weighted average sound level from midnight to midnight, obtained aŌer the addiƟon of 5 dB to sound levels occurring in the evening from 7:00 p.m. to 10:00 p.m. and aŌer the addiƟon of 10 dB to sound levels occurring in the night between 10:00 p.m. and 7:00 a.m.
Day/Night Average Noise
Level, Ldn
The 24-hour A-weighted average sound level from midnight to midnight, obtained aŌer the addiƟon of 10 dB to sound levels occurring in the night between 10:00 p.m. and 7:00 a.m.
Lmax, Lmin The maximum and minimum A-weighted sound levels measured on a sound level meter during a designated Ɵme interval using fast Ɵme averaging.
Ambient Noise Level The all-encompassing noise associated with a given environment at a specified Ɵme; usually a composite of sound from many sources from many direcƟons, near and far; no parƟcular sound is dominant.
Intrusive The noise that intrudes over and above the exisƟng ambient noise at a given locaƟon. The relaƟve intrusiveness of a sound depends on its amplitude, duraƟon, frequency, Ɵme of occurrence, and tonal or informaƟonal content, as well as the prevailing ambient noise level.
Source: Handbook of AcousƟcal Measurements and Noise Control (Harris 1991).
Table B: Common Sound Levels and Their Noise Sources
Noise Source A-Weighted Sound
Level in Decibels Noise Environments SubjecƟve EvaluaƟons Near Jet Engine 140 Deafening 128 Ɵmes as loud
Civil Defense Siren 130 Threshold of Pain 64 Ɵmes as loud Hard Rock Band 120 Threshold of Feeling 32 Ɵmes as loud AcceleraƟng Motorcycle a Few Feet Away 110 Very Loud 16 Ɵmes as loud Pile Driver; Noisy Urban Street/Heavy City Traffic 100 Very Loud 8 Ɵmes as loud Ambulance Siren; Food Blender 95 Very Loud —
Garbage Disposal 90 Very Loud 4 Ɵmes as loud
Freight Cars; Living Room Music 85 Loud —
PneumaƟc Drill; Vacuum Cleaner 80 Loud 2 Ɵmes as loud
Busy Restaurant 75 Moderately Loud —
Near-Freeway Auto Traffic 70 Moderately Loud Reference Level Average Office 60 Quiet ½ as loud
Suburban Street 55 Quiet —
Light Traffic; SoŌ Radio Music in Apartment 50 Quiet ¼ as loud Large Transformer 45 Quiet —
Average Residence without Stereo Playing 40 Faint ⅛ as loud SoŌ Whisper 30 Faint —
Rustling Leaves 20 Very Faint —
Human Breathing 10 Very Faint Threshold of Hearing
— 0 Very Faint —
Source: Compiled by LSA (2004).
LSA
8/6/26 (P:\2026\20263059-One Beverly Hills\Product\Noise\Noise Memo_20260806.docx) 6
FUNDAMENTALS OF VIBRATION
VibraƟon refers to ground-borne noise and percepƟble moƟon. Ground-borne vibraƟon is almost exclusively a concern inside buildings and is rarely perceived as a problem outdoors. The moƟon may be discernible outdoors, but without the effects associated with the shaking of a building, there is less adverse reacƟon. VibraƟon energy propagates from a source through intervening soil and rock layers to the foundaƟons of nearby buildings. The vibraƟon then propagates from the foundaƟon throughout the remainder of the structure. Building vibraƟon may be perceived by occupants as the moƟon of building surfaces, the raƩling of items on shelves or wall hangings, or a low-frequency rumbling noise. The rumbling noise is caused by the vibraƟon of walls, floors, and ceilings radiaƟng sound waves. Annoyance from vibraƟon oŌen occurs when the vibraƟon exceeds the threshold of percepƟon by 10 dB or less, which is an order of magnitude below the damage threshold for normal buildings.
Typical sources of ground-borne vibraƟon are construcƟon acƟviƟes (e.g., blasƟng, pile driving, and operaƟng heavy-duty earthmoving equipment), steel-wheeled trains, and occasional traffic on rough roads. When roadways are smooth, vibraƟon from traffic, even heavy trucks, is rarely percepƟble. It is assumed for most projects that the roadway surface will be smooth enough that ground-borne vibraƟon from street traffic will not exceed the impact criteria; however, both construcƟon of a project and freight train operaƟons could result in ground-borne vibraƟon that may be percepƟble and annoying.