Cities Index.
Agenda packet, second session

Brentwood City Council
November 12, 2024

Document
Agenda packet, second session
Meeting
November 12, 2024
Body
Brentwood City Council
Pages
573
Original file
40.5 MB
Text extracted from the city's file for reading and search. Open the original on pub-brentwood.escribemeetings.com. That file is the official record.

Apricot Residential Traffic Impact Study
P a g e | 20

4.2 PROJECT TRIP GENERATION
TJKM developed estimated project trip generation for the proposed project based on published trip generation rates from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th edition publication. TJKM used published trip rates for the ITE Land Use Code 210 (Single-Family Detached Housing). The proposed project is expected to generate 594 total daily trips, including 44 a.m. peak hour trips (11 in, 33 out) and 59 p.m. peak hour trips (37 in, 22 out).

Table 7 shows the trips expected to be generated by the proposed project.

Table 7: Project Trip Generation
Land Use Size Daily AM Peak PM Peak
Rate Trips Rate In:Out In Out Total Rate In:Out In Out Total Proposed Uses
Single-Family Detached
Housing (210) 63 DU 9.43 594 0.70 26:74 11 33 44 0.94 63:37 37 22 59 Total 594 11 33 44 37 22 59
Notes:

1. Trip Generation, 11th Edition, Institute of Transportation Engineers (ITE), 2021

2. DU: dwelling unit

4.3 PROJECT TRIP DISTRIBUTION AND ASSIGNMENT
Trip distribution is a process that determines in what proportion vehicles would be expected to travel between the project site and various destinations outside the project study area. Assignment determines the various routes that vehicles would take from the project site to each destination using the calculated trip distribution. Trip distribution assumptions for the proposed development project were developed based on the existing travel patterns and TJKM’s knowledge of the study area. The distribution assumptions for the proposed project are as follows:
 60 percent to/from the west of Sand Creek Rd at Fairview Ave,  15 percent to/from the east of Sand Creek Rd at Fairview Ave,  5 percent to/from the south of Fairway Ave at Sand Creek Rd, and  20 percent to/from the north of Fairway Ave at Apricot Way.

Figure 8 and Figure 9 illustrate the trip distribution and trip assignment at the study intersections.

The project trips were then added to traffic volumes under Existing Conditions to generate Existing plus Project Conditions traffic volumes.

Attachment G - Trumark Traffic Report 11.15.22

Page 312 of 573 ends

Figure 8: Project Trip Distribution
N
TJKM
239-046 | 11/2022
Project Site
X Study Intersection
LEGEND
Apricot TIS
XX% Trip Distribution
60%
15%
5%
20%
Sand Creek Rd
Empress Ln
Miwok
Park
King
Park
Grant St
Montclair Pl
Sage Ct
Strathaven Pl
Moreau Way
Gabriella Ln
Minnesota Ave
Roselinda Dr
Apricot Way
Fairview Ave
Empire Ave
Shady Willow Ln
Sand Creek Trail
O’Hara Ave
Sunflower Ln
2 1
Attachment G - Trumark Traffic Report 11.15.22

Page 313 of 573 ends








 



 


Figure 9: Site Trip Assignment
N
TJKM
239-046| 11/2022
Project Site
X Study Intersection
LEGEND
Apricot TIS
Stop Sign XX AM Peak Hour Volumes
Traffic Signal (XX) PM Peak Hour Volumes


 1 




 2 








Sunflower Ln
Sand Creek Rd
HIghland Way
Empress Ln
Miwok
Park
King
Park
Grant St
Montclair Pl
Sage Ct
Strathaven Pl
Moreau Way
Gabriella Ln
Minnesota Ave
Minnesota Ave
Roselinda Dr
Apricot Way
Fairview Ave
Empire Ave
Shady Willow Ln
Sand Creek Trail
O’Hara Ave
7 (22)
2 (6)1 (2)
20 (13)
2 (1)
5 (3)
7 (4)
26 (18)
9 (30)
2 (7)
2 1
Attachment G - Trumark Traffic Report 11.15.22

Page 314 of 573 ends

Apricot Residential Traffic Impact Study
P a g e | 23

4.4 INTERSECTION LEVEL OF SERVICE ANALYSIS – EXISTING PLUS PROJECT CONDITIONS The intersection LOS analysis results for Existing plus Project Conditions are summarized in Table 8. The results for the Existing Conditions scenario are included for comparison purpose.

Under this scenario, both study intersections would continue to operate within applicable jurisdictional (LOS D or better) standards during both peak hours.

The proposed development would have a less-than-significant impact on the surrounding road network under Existing plus Project Conditions.

Figure 10 shows projected turning movement volumes at all the study intersections for Existing plus Project Conditions. LOS worksheets are provided in Appendix C.

Table 8: Intersection Level of Service Analysis – Existing plus Project Conditions Existing Existing + Project
No. Intersection
Intersection
Control[1]
Peak
Hour[2]
Average
Delay[3] LOS[4]
Average
Delay[3] LOS[4]
Change in
Delay[5]

1 Sand Creek Rd (E/W) & Fairview Ave
(N/S) Signal
a.m. 29.6 C 30.0 C 0.4
p.m. 24.3 C 24.7 C 0.4
2 Apricot Way (E/W) & Fairview Ave
(N/S)
AWSC
a.m. 11.4 B 11.9 B 0.5
p.m. 10.0 B 10.4 B 0.4
Notes:

1. Signal = Signalized; OWSC = One-Way Stop Control; TWSC = Two-Way Stop Control; AWSC = All-Way Stop Control; Future Intersection = not in analysis scenario

2. a.m. = a.m. Peak Hour; p.m. = p.m. Peak Hour

3. Delay measured in seconds per vehicle. For signalized and all-way stop controlled intersections, the delay represents the average control delay for all turning movements. For one- and two-way stop controlled intersections, the delay represents the worse average control delay for a given approach.

4. LOS = Level of Service

Attachment G - Trumark Traffic Report 11.15.22

Page 315 of 573 ends








 



 


Figure 10: Existing Conditions plus Project Peak Hour Traffic Volumes N
TJKM
239-046| 11/2022
Project Site
X Study Intersection
LEGEND
Apricot TIS
Stop Sign XX AM Peak Hour Volumes
Traffic Signal (XX) PM Peak Hour Volumes


 1 




 2 








Sunflower Ln
Sand Creek Rd
HIghland Way
Empress Ln
Miwok
Park
King
Park
Grant St
Montclair Pl
Sage Ct
Strathaven Pl
Moreau Way
Gabriella Ln
Minnesota Ave
Minnesota Ave
Roselinda Dr
Apricot Way
Fairview Ave
Empire Ave
Shady Willow Ln
Sand Creek Trail
O’Hara Ave
32 (80)
656 (779)
163 (255)
48 (88)
625 (699)
179 (124)
204 (173)
219 (186)
190 (151)
63 (42)
214 (237)
75 (91)
9 (7)
20 (10)
96 (74)
24 (14)
29 (13)
40 (15)
60 (84)
191 (214)
19 (38)
3 (8)
188 (258)
12 (14)
2 1
Attachment G - Trumark Traffic Report 11.15.22

Page 316 of 573 ends

Apricot Residential Traffic Impact Study
Appendix A – Existing Turning Movement Counts
Attachment G - Trumark Traffic Report 11.15.22

Page 317 of 573 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
2 0
2 9
8 5
4 1
31 26
Date: 10/19/2022
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.9% 0.82
TOTAL 1.5% 0.89
TH RT
WB 2.0% 0.95
NB 2.0% 0.83
Peak Hour: 7:45 AM 8:45 AM
HV %: PHF
EB 0.9% 0.86

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Sand Creek Rd Sand Creek Rd Fairview Ave Fairview Ave
15-min
Total

UT LT TH RT
0 22 100 9 3 28
5 10 9 266 0
7:15 AM 0 2 87 23
7:00 AM 0 2 60 13 0 18 104 3 1 20 11 10 0
7 45 7 420 0
7:45 AM 0 4 160 41
6 0 25 22 27 0
348 0
7:30 AM 0 3 97 31 0 28 122
21 16 0 8 17 12
619 1,653
8:00 AM 1 5 179 45 0 45 169
0 49 146 11 4 34 45 44 0 17 56 8
1 47 153 11 2 60
12 54 10 678 2,065
8:15 AM 0 11 189 44
9 0 51 45 53 0
19 38 12 595 2,631
8:45 AM 0 4 128 30
15 3 50 64 35 0
739 2,456
8:30 AM 1 3 128 33 0 37 157
64 58 0 22 64 13
0 39 133 15 0 45 21 29 0 23 47 14 528 2,540
Count Total 2 34 1,028 260 1 285 1,084 113 331 85 4,193 0 Peak
Hour
All 2 23 656
79 13 313 293 272 0
10 2 0 5 3 4 0 0 3 0 40 0
43 2,631 0
HV 0 0 6 2 0 5
163 1 178 625 46 9 195 218 190 0 70 212
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
HV% 0% 0% 1% 1% 0% 3% 2% 4% 0% 3% 1% 2% - 0% 1% 0% 2%
0 2
7:15 AM 3 6 1 1 11 0 0
0 1 0 1 0 0
West North South
7:00 AM 5 0 1 0 6 0
EB WB NB SB Total East
7:45 AM 2 4 1 0 7
1 1 0 0 2 0
0 7:30 AM 3 1 1 2 7 0 0 0
1 0 1 0 0 0
5 1
8:15 AM 3 6 5 2 16 0 0
0 0 0 0 2 0
0 4 1
8:00 AM 0 4 2 1 7 0
0 0 1 0 1 4
8:45 AM 3 1 4 1 9
0 0 0 0 3 1
0 8:30 AM 3 3 4 0 10 0 0 0
0 0 0 1 1 3
1 0 1 0 2 0 0 0 1
17 6
Peak Hour 8 17 12 3 40 0 0
Count Total 22 25 19 7 73 1 0 4 1 6 7 1
1 0 1 7 1 15 3
0 0
0 0
00 01
0 0
0 0
15 3
1 7
N
Fairview Ave
Sand Creek Rd
Sand Creek Rd
Fairview Ave
Sand Creek Rd
Fairview Ave
TEV: 2,631
PHF: 0.89
43 212
70 325
287
0 46
625
178
850
917
1 195
218190
562
612
9 163
656
23 844
865
2 Project Manager: (415) 310-6469 [email protected] Attachment G - Trumark Traffic Report 11.15.22

Page 318 of 573 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.

Eastbound Westbound Northbound Southbound
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Sand Creek Rd Sand Creek Rd Fairview Ave Fairview Ave
15-min
Total
Rolling
One Hour Eastbound Westbound
0 0 0 6 0
7:15 AM 0 0 1 2
0 0 0 0 1 0
TH RT
7:00 AM 0 0 5 0 0 0 0

UT LT TH RT UT LT
11 0
7:30 AM 0 0 3 0 0 1 0
0 2 3 1 0 0 1 0 0 1 0 0
0 1 2 1 0 0
0 2 0 7 0
7:45 AM 0 0 2 0
0 0 0 1 0 0
0 1 0 7 32
8:15 AM 0 0 2 1
0 0 2 0 0 0
7 31
8:00 AM 0 0 0 0 0 1 3
0 1 0 0 0 0
16 37
8:30 AM 0 0 2 1 0 0 3
0 3 2 1 0 2 2 1 0 0 2 0
0 1 0 0 0 2
0 0 0 10 40
8:45 AM 0 0 3 0
0 0 1 1 2 0
1 1 0 1 0 0 9 42
2 5 0 73 0
Peak Hour 0 0 6 2
Count Total 0 0 18 4 0 9 13 3 0 7 6 6 0
7:00 AM 1 0
RT
40 0
Interval
Start
Sand Creek Rd Sand Creek Rd Fairview Ave Fairview Ave
15-min
Total
Rolling
One Hour
0 5 10 2 0 5 3 4 0 0 3 0

LT TH RT RT LT TH RT
4 8:00 AM
0 1 0 1
1 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 1 0 0 0 0 1
0 0
0 0 0
0 1
8:45 AM
0 0 0 0
2 8:30 AM
0 0 0 0 0 0 0
0 3
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0 1 0 0 1 0 0 2 2
Peak Hour
Count Total 0 1
0 LT TH
0 1 0 0 0 0 1
0 3 1 0 6 0
0 0
0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 1 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 0 0 0 0 0 0
0 1 0 0 0 0
0 0 0
0 0 0
1 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 [email protected] Attachment G - Trumark Traffic Report 11.15.22

Page 319 of 573 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
6 0
1 0
6 0
0 2
15 7
Date: 10/19/2022
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.8% 0.91
TOTAL 0.8% 0.97
TH RT
WB 0.9% 0.90
NB 1.2% 0.90
Peak Hour: 4:30 PM 5:30 PM
HV %: PHF
EB 0.6% 0.93

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Sand Creek Rd Sand Creek Rd Fairview Ave Fairview Ave
15-min
Total

UT LT TH RT
0 36 160 14 3 32
15 47 9 686 0
4:15 PM 0 13 193 49
4:00 PM 0 13 189 76 1 24 167 16 0 44 54 31 0
21 65 11 666 0
4:45 PM 1 24 201 68
21 1 28 48 41 0
665 0
4:30 PM 0 6 187 67 0 21 149
50 43 0 22 43 7
732 2,749
5:00 PM 0 12 203 59 1 32 200
0 40 167 20 1 43 48 38 0 20 55 6
1 29 183 22 3 56
18 57 3 723 2,786
5:15 PM 0 15 188 61
19 2 39 49 29 0
23 48 12 649 2,841
5:45 PM 1 15 204 51
19 0 44 44 30 0
737 2,858
5:30 PM 0 11 188 62 0 22 146
39 43 0 29 59 9
0 18 133 11 2 33 37 30 0 17 54 11 617 2,726
Count Total 2 109 1,553 493 3 222 1,305 165 428 68 5,475 0 Peak
Hour
All 1 57 779
142 12 319 369 285 0
6 0 0 3 2 1 0 0 3 0 24 0
29 2,858 0
HV 0 0 4 3 0 2
255 2 122 699 82 7 166 184 151 0 88 236
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
HV% 0% 0% 1% 1% 0% 2% 1% 0% 0% 2% 1% 1% - 0% 1% 0% 1%
0 4
4:15 PM 3 4 0 2 9 0 0
0 1 0 1 1 1
West North South
4:00 PM 6 3 2 0 11 0
EB WB NB SB Total East
4:45 PM 1 1 0 0 2
0 0 0 0 0 1
0 4:30 PM 2 3 2 0 7 0 0 0
0 0 0 0 0 0
3 0
5:15 PM 1 0 1 0 2 0 0
0 0 0 0 0 3
0 0 0
5:00 PM 3 4 3 3 13 0
0 1 0 0 1 0
5:45 PM 1 1 0 1 3
0 0 0 0 0 0
0 5:30 PM 3 0 2 1 6 0 0 0
1 0 1 0 0 0
0 0 0 0 0 0 0 1 1
4 6
Peak Hour 7 8 6 3 24 0 1
Count Total 20 16 10 7 53 0 1 2 0 3 1 4
1 0 2 0 3 3 1
0 0
0 0
00 01
0 0
1 0
3 1
3 0
N
Fairview Ave
Sand Creek Rd
Sand Creek Rd
Fairview Ave
Sand Creek Rd
Fairview Ave
TEV: 2,858
PHF: 0.97
29 236
88 353
323
0 82
699
122
905
1,020
2 166
184151
620
508
7 255
779
57 1,092
895
1 Project Manager: (415) 310-6469 [email protected] Attachment G - Trumark Traffic Report 11.15.22

Page 320 of 573 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.

Eastbound Westbound Northbound Southbound
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Sand Creek Rd Sand Creek Rd Fairview Ave Fairview Ave
15-min
Total
Rolling
One Hour Eastbound Westbound
0 0 0 11 0
4:15 PM 0 0 2 1
0 0 1 0 1 0
TH RT
4:00 PM 0 0 3 3 0 0 3

UT LT TH RT UT LT
9 0
4:30 PM 0 0 1 1 0 0 3
0 1 3 0 0 0 0 0 0 0 2 0
0 0 1 0 0 0
0 0 0 7 0
4:45 PM 0 0 0 1
0 0 1 0 1 0
0 3 0 13 31
5:15 PM 0 0 1 0
0 0 1 2 0 0
2 29
5:00 PM 0 0 2 1 0 2 2
0 0 0 0 0 0
2 24
5:30 PM 0 0 2 1 0 0 0
0 0 0 0 0 1 0 0 0 0 0 0
0 0 1 0 0 0
0 1 0 6 23
5:45 PM 0 0 0 1
0 0 2 0 0 0
0 0 0 0 1 0 3 24
0 7 0 53 0
Peak Hour 0 0 4 3
Count Total 0 0 11 9 0 3 13 0 0 6 2 2 0
4:00 PM 1 0
RT
24 0
Interval
Start
Sand Creek Rd Sand Creek Rd Fairview Ave Fairview Ave
15-min
Total
Rolling
One Hour
0 2 6 0 0 3 2 1 0 0 3 0

LT TH RT RT LT TH RT
2 5:00 PM
0 0 0 1
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 1 0
0 2
5:45 PM
0 0 0 0
2 5:30 PM
0 1 0 0 0 0 1
0 1
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0 0 0 1
Peak Hour
Count Total 0 0
0 LT TH
0 1 0 0 0 0 2
0 2 0 0 3 0
0 0
0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 1 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 0 0 0 0 1 0
0 0 0 0 1 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 [email protected] Attachment G - Trumark Traffic Report 11.15.22

Page 321 of 573 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 0
3 0
1 0
0 2
7 1
Date: 10/19/2022
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 1.5% 0.85
TOTAL 1.1% 0.77
TH RT
WB 0.0% 0.80
NB 1.5% 0.78
Peak Hour: 7:45 AM 8:45 AM
HV %: PHF
EB 0.0% 0.62

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Apricot Way Sunflower Ln Fairview Ave Fairview Ave
15-min
Total

UT LT TH RT
0 4 1 3 0 3
0 16 0 45 0
7:15 AM 0 1 0 5
7:00 AM 0 1 1 3 0 3 1 2 0 4 12 2 0
1 38 2 99 0
7:45 AM 0 1 2 23
2 0 6 25 2 0
58 0
7:30 AM 0 0 0 15 0 6 2
20 3 0 1 16 1
149 351
8:00 AM 0 0 4 11 0 6 11
0 12 7 6 0 15 39 1 0 1 42 0
0 14 9 6 0 12
6 52 0 154 460
8:15 AM 0 1 11 25
9 0 11 39 5 0
2 38 1 135 647
8:45 AM 0 0 3 17
3 0 13 48 6 0
209 611
8:30 AM 0 0 3 11 0 8 2
65 7 0 3 56 0
0 11 5 6 0 8 35 3 0 3 56 1 148 646
Count Total 0 4 24 110 0 64 38 17 314 5 997 0
Peak
Hour
All 0 2 20
37 0 72 283 29 0
0 0 0 1 2 1 0 0 2 1 7 0
1 647 0
HV 0 0 0 0 0 0
70 0 40 29 24 0 51 191 19 0 12 188
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
HV% - 0% 0% 0% - 0% 0% 0% - 2% 1% 5% - 0% 1% 100% 1%
1 0
7:15 AM 0 1 2 2 5 0 0
0 0 0 0 0 0
West North South
7:00 AM 0 0 0 0 0 0
EB WB NB SB Total East
7:45 AM 0 0 1 0 1
1 2 2 0 1 0
0 7:30 AM 0 0 1 1 2 0 0 1
0 0 0 0 0 0
0 0
8:15 AM 0 0 2 1 3 0 0
0 0 0 0 1 0
0 0 0
8:00 AM 0 0 0 1 1 0
0 0 1 0 1 0
8:45 AM 0 1 1 2 4
0 0 0 0 0 0
0 8:30 AM 0 0 1 1 2 0 0 0
0 0 0 0 0 0
0 0 1 0 1 0 1 1 0
3 0
Peak Hour 0 0 4 3 7 0 0
Count Total 0 2 8 8 18 0 0 3 1 4 3 1
1 0 1 1 0 0 0
0 0
0 0
00 01
0 0
0 0
0 0
0 1
N
Fairview Ave
Apricot Way
Sunflower Ln
Fairview Ave
Apricot Way
Fairview Ave
TEV: 647
PHF: 0.77
1 188
12 201
217
0 24
29 40
93 51
0 19
191
51 298
261
0 70
20 2
92 81
0 Project Manager: (415) 310-6469 [email protected] Attachment G - Trumark Traffic Report 11.15.22

Page 322 of 573 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.

Eastbound Westbound Northbound Southbound
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Apricot Way Sunflower Ln Fairview Ave Fairview Ave
15-min
Total
Rolling
One Hour Eastbound Westbound
0 0 0 0 0
7:15 AM 0 0 0 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 0 0 0 0 0

UT LT TH RT UT LT
5 0
7:30 AM 0 0 0 0 0 0 0
0 0 0 1 0 1 1 0 0 1 1 0
0 0 0 0 0 1
0 1 0 2 0
7:45 AM 0 0 0 0
0 0 0 1 0 0
0 1 0 1 9
8:15 AM 0 0 0 0
0 0 0 0 0 0
1 8
8:00 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
3 7
8:30 AM 0 0 0 0 0 0 0
0 0 0 0 0 0 1 1 0 0 1 0
0 0 1 0 0 0
0 0 1 2 7
8:45 AM 0 0 0 0
0 0 0 1 0 0
1 0 0 1 1 0 4 10
2 5 1 18 0
Peak Hour 0 0 0 0
Count Total 0 0 0 0 0 0 1 1 0 2 5 1 0
7:00 AM 0 0
RT
7 0
Interval
Start
Apricot Way Sunflower Ln Fairview Ave Fairview Ave
15-min
Total
Rolling
One Hour
0 0 0 0 0 1 2 1 0 0 2 1

LT TH RT RT LT TH RT
3 8:00 AM
0 1 0 1
2 0
7:45 AM
0 1 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
0 1
8:45 AM
0 0 0 0
3 8:30 AM
0 0 0 0 0 0 0
0 3
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 1 0 0 1 1
Peak Hour
Count Total 0 1
0 LT TH
0 1 0 0 0 0 1
0 3 0 0 4 0
0 0
0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
0 0 0
1 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 [email protected] Attachment G - Trumark Traffic Report 11.15.22

Page 323 of 573 ends

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
0 0
0 0
1 0
1 0
2 1
Date: 10/19/2022
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 1.1% 0.90
TOTAL 1.0% 0.99
TH RT
WB 0.0% 0.81
NB 1.3% 0.90
Peak Hour: 4:30 PM 5:30 PM
HV %: PHF
EB 0.0% 0.78

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Apricot Way Sunflower Ln Fairview Ave Fairview Ave
15-min
Total

UT LT TH RT
0 4 2 2 0 11
3 55 2 175 0
4:15 PM 0 2 6 19
4:00 PM 0 2 2 7 0 6 5 6 0 11 61 15 0
0 75 1 174 0
4:45 PM 0 0 4 8
3 0 16 47 10 0
157 0
4:30 PM 0 1 2 13 0 5 1
45 9 0 7 50 0
173 679
5:00 PM 0 2 1 16 0 1 4
0 3 3 3 0 15 56 14 0 3 64 0
0 6 5 2 0 11
5 58 0 171 675
5:15 PM 0 0 3 19
6 0 12 59 7 0
4 60 0 170 686
5:45 PM 0 2 4 20
3 0 23 43 6 0
172 690
5:30 PM 0 2 5 16 0 4 4
52 7 0 6 61 0
0 14 3 2 0 6 41 5 0 4 54 4 159 672
Count Total 0 11 27 118 0 43 27 32 477 7 1,351 0
Peak
Hour
All 0 3 10
27 0 105 404 73 0
0 0 0 0 3 1 0 0 3 0 7 0
1 690 0
HV 0 0 0 0 0 0
56 0 15 13 14 0 54 214 38 0 14 258
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
HV% - 0% 0% 0% - 0% 0% 0% - 0% 1% 3% - 0% 1% 0% 1%
0 0
4:15 PM 1 0 0 2 3 0 0
0 1 0 1 0 0
West North South
4:00 PM 0 1 2 0 3 0
EB WB NB SB Total East
4:45 PM 0 0 0 2 2
0 0 0 0 0 0
0 4:30 PM 0 0 2 0 2 0 0 0
0 0 0 0 0 0
0 0
5:15 PM 0 0 0 0 0 0 0
0 0 0 0 1 0
0 0 0
5:00 PM 0 0 2 1 3 0
0 0 0 0 0 0
5:45 PM 0 0 0 1 1
0 0 0 0 0 1
0 5:30 PM 0 0 0 1 1 0 0 0
1 1 2 0 0 0
0 0 0 0 0 0 0 0 0
0 1
Peak Hour 0 0 4 3 7 0 0
Count Total 1 1 6 7 15 0 0 2 1 3 1 0
1 1 2 1 0 0 0
0 0
0 0
10 01
0 0
0 0
0 0
0 1
N
Fairview Ave
Apricot Way
Sunflower Ln
Fairview Ave
Apricot Way
Fairview Ave
TEV: 690
PHF: 0.99
1 258
14 273
231
0 14
13 15
42 62
0 38
214
54 329
306
0 56
10 3
69 68
0 Project Manager: (415) 310-6469 [email protected] Attachment G - Trumark Traffic Report 11.15.22

Page 324 of 573 ends

www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.

Eastbound Westbound Northbound Southbound
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Apricot Way Sunflower Ln Fairview Ave Fairview Ave
15-min
Total
Rolling
One Hour Eastbound Westbound
0 0 0 3 0
4:15 PM 0 0 0 1
1 0 0 1 1 0
TH RT
4:00 PM 0 0 0 0 0 0 0

UT LT TH RT UT LT
3 0
4:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 2 0
0 0 0 0 0 0
0 0 0 2 0
4:45 PM 0 0 0 0
0 0 0 1 1 0
0 1 0 3 10
5:15 PM 0 0 0 0
0 0 0 2 0 0
2 10
5:00 PM 0 0 0 0 0 0 0
0 0 0 0 2 0
0 7
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 1 0 1 6
5:45 PM 0 0 0 0
0 0 0 0 0 0
0 0 0 0 1 0 1 5
0 7 0 15 0
Peak Hour 0 0 0 0
Count Total 0 0 0 1 0 0 0 1 0 0 4 2 0
4:00 PM 1 0
RT
7 0
Interval
Start
Apricot Way Sunflower Ln Fairview Ave Fairview Ave
15-min
Total
Rolling
One Hour
0 0 0 0 0 0 3 1 0 0 3 0

LT TH RT RT LT TH RT
1 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
0 2
5:45 PM
0 0 0 0
2 5:30 PM
0 1 0 0 1 0 2
0 0
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0 0 0 2
Peak Hour
Count Total 0 1
0 LT TH
0 1 0 0 1 0 2
0 2 0 0 3 0
0 0
0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 1 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
0 0 0
0 0
0 0 0
0 0 0
Project Manager: (415) 310-6469 [email protected] Attachment G - Trumark Traffic Report 11.15.22

Page 325 of 573 ends

Apricot Residential Traffic Impact Study
Appendix B – Existing Conditions Intersections Level of Service Worksheets
Attachment G - Trumark Traffic Report 11.15.22

Page 326 of 573 ends

HCM 6th Signalized Intersection Summary Existing AM
1: Fairview Ave & Sand Creek Road Timing Plan: A.M Peak Apricot TIS Synchro 11 Report
TJKM 11/02/2022
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 25 656 163 179 625 46 204 218 190 70 212 43 Future Volume (veh/h) 25 656 163 179 625 46 204 218 190 70 212 43 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.95 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 28 737 183 201 702 52 229 245 213 79 238 48 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 222222222222
Cap, veh/h 50 1118 491 236 1490 634 267 495 415 137 359 294 Arrive On Green 0.03 0.31 0.31 0.13 0.42 0.42 0.15 0.26 0.26 0.08 0.19 0.19 Sat Flow, veh/h 1781 3554 1561 1781 3554 1511 1781 1870 1567 1781 1870 1531 Grp Volume(v), veh/h 28 737 183 201 702 52 229 245 213 79 238 48 Grp Sat Flow(s),veh/h/ln 1781 1777 1561 1781 1777 1511 1781 1870 1567 1781 1870 1531 Q Serve(g_s), s 1.4 16.0 8.1 9.8 12.7 1.8 11.2 9.9 10.3 3.8 10.5 2.3 Cycle Q Clear(g_c), s 1.4 16.0 8.1 9.8 12.7 1.8 11.2 9.9 10.3 3.8 10.5 2.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 50 1118 491 236 1490 634 267 495 415 137 359 294 V/C Ratio(X) 0.56 0.66 0.37 0.85 0.47 0.08 0.86 0.49 0.51 0.58 0.66 0.16 Avail Cap(c_a), veh/h 300 1396 613 300 1490 634 500 525 440 300 525 429 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 42.8 26.4 23.7 37.8 18.7 15.6 36.9 27.7 27.9 39.7 33.3 30.0 Incr Delay (d2), s/veh 3.6 1.5 1.0 14.0 0.5 0.1 3.1 1.6 2.1 1.4 4.4 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 6.5 0.1 5.0 4.8 0.6 4.8 4.3 3.8 1.7 5.1 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 46.4 27.9 24.7 51.8 19.2 15.7 40.0 29.4 30.0 41.1 37.8 30.6 LnGrp LOS DCCDBBDCCDDC
Approach Vol, veh/h 948 955 687 365
Approach Delay, s/veh 27.9 25.9 33.1 37.6
Approach LOS CCCD
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 15.8 33.5 17.4 22.4 6.5 42.9 10.9 28.9 Change Period (Y+Rc), s 4.0 5.5 4.0 5.3 4.0 5.5 4.0 5.3 Max Green Setting (Gmax), s 15.0 35.0 25.0 25.0 15.0 35.0 15.0 25.0 Max Q Clear Time (g_c+I1), s 11.8 18.0 13.2 12.5 3.4 14.7 5.8 12.3 Green Ext Time (p_c), s 0.1 8.5 0.2 2.1 0.0 8.1 0.0 3.1 Intersection Summary
HCM 6th Ctrl Delay 29.6
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.

Attachment G - Trumark Traffic Report 11.15.22

Page 327 of 573 ends

HCM 6th AWSC Existing AM
2: Fairview Ave & Apricot Way/Sunflower Lane Timing Plan: A.M Peak Apricot TIS Synchro 11 Report
TJKM 11/02/2022
Intersection
Intersection Delay, s/veh 11.4
Intersection LOS B
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 2 20 70 40 29 24 51 191 19 12 188 1
Future Vol, veh/h 2 20 70 40 29 24 51 191 19 12 188 1
Peak Hour Factor 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 Heavy Vehicles, % 222222222222
Mvmt Flow 3 26 91 52 38 31 66 248 25 16 244 1
Number of Lanes 110010010010
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1211
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1121
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1112
HCM Control Delay 9.8 10.1 12.5 11.2

HCM LOS ABBB

Lane NBLn1 EBLn1 EBLn2 WBLn1 SBLn1
Vol Left, % 20% 100% 0% 43% 6%
Vol Thru, % 73% 0% 22% 31% 94%
Vol Right, % 7% 0% 78% 26% 0%
Sign Control Stop Stop Stop Stop Stop
Traffic Vol by Lane 261 2 90 93 201
LT Vol 51 2 0 40 12
Through Vol 191 0 20 29 188
RT Vol 19 0 70 24 1
Lane Flow Rate 339 3 117 121 261
Geometry Grp 27752
Degree of Util (X) 0.474 0.005 0.185 0.192 0.371
Departure Headway (Hd) 5.03 6.775 5.713 5.729 5.122
Convergence, Y/N Yes Yes Yes Yes Yes
Cap 722 528 628 626 702
Service Time 3.03 4.515 3.453 3.77 3.151
HCM Lane V/C Ratio 0.47 0.006 0.186 0.193 0.372
HCM Control Delay 12.5 9.5 9.8 10.1 11.2
HCM Lane LOS BAABB
HCM 95th-tile Q 2.6 0 0.7 0.7 1.7
Attachment G - Trumark Traffic Report 11.15.22

Page 328 of 573 ends

HCM 6th Signalized Intersection Summary Existing PM
1: Fairview Ave & Sand Creek Road Timing Plan: P.M Peak Apricot TIS Synchro 11 Report
TJKM 11/02/2022
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 58 779 255 124 699 82 173 184 151 88 236 29 Future Volume (veh/h) 58 779 255 124 699 82 173 184 151 88 236 29 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 60 803 263 128 721 85 178 190 156 91 243 30 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 222222222222
Cap, veh/h 85 1271 557 163 1427 621 220 395 334 161 334 282 Arrive On Green 0.05 0.36 0.36 0.09 0.40 0.40 0.12 0.21 0.21 0.09 0.18 0.18 Sat Flow, veh/h 1781 3554 1556 1781 3554 1546 1781 1870 1583 1781 1870 1582 Grp Volume(v), veh/h 60 803 263 128 721 85 178 190 156 91 243 30 Grp Sat Flow(s),veh/h/ln 1781 1777 1556 1781 1777 1546 1781 1870 1583 1781 1870 1582 Q Serve(g_s), s 2.5 14.1 9.8 5.3 11.5 2.6 7.3 6.7 6.5 3.7 9.2 1.2 Cycle Q Clear(g_c), s 2.5 14.1 9.8 5.3 11.5 2.6 7.3 6.7 6.5 3.7 9.2 1.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 85 1271 557 163 1427 621 220 395 334 161 334 282 V/C Ratio(X) 0.71 0.63 0.47 0.79 0.51 0.14 0.81 0.48 0.47 0.57 0.73 0.11 Avail Cap(c_a), veh/h 355 1650 723 355 1650 718 591 620 525 355 620 525 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.4 20.1 18.7 33.5 16.9 14.3 32.2 26.1 26.0 32.9 29.2 25.9 Incr Delay (d2), s/veh 4.1 1.1 1.3 3.2 0.6 0.2 2.7 1.9 2.2 1.2 6.4 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 5.3 3.3 2.3 4.2 0.8 3.1 2.9 2.4 1.6 4.5 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 39.4 21.2 20.0 36.7 17.5 14.5 34.9 28.0 28.2 34.0 35.6 26.3 LnGrp LOS DCCDBBCCCCDC
Approach Vol, veh/h 1126 934 524 364
Approach Delay, s/veh 21.9 19.9 30.4 34.4
Approach LOS C B C C
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 10.9 32.5 13.3 18.7 7.6 35.8 10.8 21.2 Change Period (Y+Rc), s 4.0 5.5 4.0 5.3 4.0 5.5 4.0 5.3 Max Green Setting (Gmax), s 15.0 35.0 25.0 25.0 15.0 35.0 15.0 25.0 Max Q Clear Time (g_c+I1), s 7.3 16.1 9.3 11.2 4.5 13.5 5.7 8.7 Green Ext Time (p_c), s 0.1 10.3 0.2 2.1 0.0 8.8 0.1 2.6 Intersection Summary
HCM 6th Ctrl Delay 24.3
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.

Attachment G - Trumark Traffic Report 11.15.22

Page 329 of 573 ends

HCM 6th AWSC Existing PM
2: Fairview Ave & Apricot Way/Sunflower Lane Timing Plan: P.M Peak Apricot TIS Synchro 11 Report
TJKM 11/02/2022
Intersection
Intersection Delay, s/veh 10
Intersection LOS A
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 3 10 56 15 13 14 54 214 38 14 258 1
Future Vol, veh/h 3 10 56 15 13 14 54 214 38 14 258 1
Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Heavy Vehicles, % 222222222222
Mvmt Flow 3 10 57 15 13 14 55 216 38 14 261 1
Number of Lanes 110010010010
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1211
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1121
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1112
HCM Control Delay 8.6 8.8 10.4 10.1

HCM LOS AABB

Lane NBLn1 EBLn1 EBLn2 WBLn1 SBLn1
Vol Left, % 18% 100% 0% 36% 5%
Vol Thru, % 70% 0% 15% 31% 95%
Vol Right, % 12% 0% 85% 33% 0%
Sign Control Stop Stop Stop Stop Stop
Traffic Vol by Lane 306 3 66 42 273
LT Vol 54 3 0 15 14
Through Vol 214 0 10 13 258
RT Vol 38 0 56 14 1
Lane Flow Rate 309 3 67 42 276
Geometry Grp 27752
Degree of Util (X) 0.386 0.005 0.098 0.063 0.35
Departure Headway (Hd) 4.495 6.405 5.297 5.329 4.573
Convergence, Y/N Yes Yes Yes Yes Yes
Cap 801 557 673 668 786
Service Time 2.531 4.167 3.059 3.395 2.611
HCM Lane V/C Ratio 0.386 0.005 0.1 0.063 0.351
HCM Control Delay 10.4 9.2 8.6 8.8 10.1
HCM Lane LOS BAAAB
HCM 95th-tile Q 1.8 0 0.3 0.2 1.6
Attachment G - Trumark Traffic Report 11.15.22

Page 330 of 573 ends

Apricot Residential Traffic Impact Study
Appendix C – Existing plus Project Conditions Intersections Level of Service Worksheets
Attachment G - Trumark Traffic Report 11.15.22

Page 331 of 573 ends

HCM 6th Signalized Intersection Summary Existing Plus Project Condition AM 1: Fairview Ave & Sand Creek Road Timing Plan: A.M Peak Apricot TIS Synchro 11 Report
TJKM 11/02/2022
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 32 656 163 179 625 48 204 219 190 75 214 63 Future Volume (veh/h) 32 656 163 179 625 48 204 219 190 75 214 63 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.95 1.00 0.99 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 36 737 183 201 702 54 229 246 213 84 240 71 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 222222222222
Cap, veh/h 59 1115 490 236 1469 625 267 496 415 140 362 296 Arrive On Green 0.03 0.31 0.31 0.13 0.41 0.41 0.15 0.27 0.27 0.08 0.19 0.19 Sat Flow, veh/h 1781 3554 1561 1781 3554 1511 1781 1870 1567 1781 1870 1531 Grp Volume(v), veh/h 36 737 183 201 702 54 229 246 213 84 240 71 Grp Sat Flow(s),veh/h/ln 1781 1777 1561 1781 1777 1511 1781 1870 1567 1781 1870 1531 Q Serve(g_s), s 1.8 16.1 8.2 9.9 12.9 1.9 11.2 10.0 10.3 4.1 10.6 3.5 Cycle Q Clear(g_c), s 1.8 16.1 8.2 9.9 12.9 1.9 11.2 10.0 10.3 4.1 10.6 3.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 59 1115 490 236 1469 625 267 496 415 140 362 296 V/C Ratio(X) 0.61 0.66 0.37 0.85 0.48 0.09 0.86 0.50 0.51 0.60 0.66 0.24 Avail Cap(c_a), veh/h 299 1390 611 299 1469 625 498 523 438 299 523 428 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 42.7 26.6 23.9 37.9 19.2 16.0 37.1 27.8 28.0 39.9 33.4 30.5 Incr Delay (d2), s/veh 3.8 1.5 1.0 14.2 0.5 0.1 3.1 1.6 2.1 1.6 4.4 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 6.5 0.1 5.0 4.9 0.6 4.8 4.4 3.9 1.8 5.1 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 46.5 28.1 24.9 52.2 19.7 16.1 40.2 29.5 30.1 41.4 37.8 31.4 LnGrp LOS DCCDBBDCCDDC
Approach Vol, veh/h 956 957 688 395
Approach Delay, s/veh 28.2 26.3 33.2 37.4
Approach LOS CCCD
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 15.9 33.6 17.4 22.6 7.0 42.5 11.0 29.0 Change Period (Y+Rc), s 4.0 5.5 4.0 5.3 4.0 5.5 4.0 5.3 Max Green Setting (Gmax), s 15.0 35.0 25.0 25.0 15.0 35.0 15.0 25.0 Max Q Clear Time (g_c+I1), s 11.9 18.1 13.2 12.6 3.8 14.9 6.1 12.3 Green Ext Time (p_c), s 0.1 8.5 0.2 2.2 0.0 8.0 0.1 3.1 Intersection Summary
HCM 6th Ctrl Delay 30.0
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.

Attachment G - Trumark Traffic Report 11.15.22

Page 332 of 573 ends

HCM 6th AWSC Existing Plus Project Condition AM
2: Fairview Ave & Apricot Way/Sunflower Lane Timing Plan: A.M Peak Apricot TIS Synchro 11 Report
TJKM 11/02/2022
Intersection
Intersection Delay, s/veh 11.9
Intersection LOS B
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 9 20 96 40 29 24 60 191 19 12 188 3
Future Vol, veh/h 9 20 96 40 29 24 60 191 19 12 188 3
Peak Hour Factor 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 Heavy Vehicles, % 222222222222
Mvmt Flow 12 26 125 52 38 31 78 248 25 16 244 4
Number of Lanes 110010010010
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1211
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1121
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1112
HCM Control Delay 10.3 10.4 13.4 11.7

HCM LOS BBBB

Lane NBLn1 EBLn1 EBLn2 WBLn1 SBLn1
Vol Left, % 22% 100% 0% 43% 6%
Vol Thru, % 71% 0% 17% 31% 93%
Vol Right, % 7% 0% 83% 26% 1%
Sign Control Stop Stop Stop Stop Stop
Traffic Vol by Lane 270 9 116 93 203
LT Vol 60 9 0 40 12
Through Vol 191 0 20 29 188
RT Vol 19 0 96 24 3
Lane Flow Rate 351 12 151 121 264
Geometry Grp 27752
Degree of Util (X) 0.504 0.022 0.241 0.198 0.388
Departure Headway (Hd) 5.173 6.861 5.763 5.903 5.297
Convergence, Y/N Yes Yes Yes Yes Yes
Cap 698 521 622 606 678
Service Time 3.208 4.609 3.51 3.953 3.335
HCM Lane V/C Ratio 0.503 0.023 0.243 0.2 0.389
HCM Control Delay 13.4 9.8 10.3 10.4 11.7
HCM Lane LOS BABBB
HCM 95th-tile Q 2.9 0.1 0.9 0.7 1.8
Attachment G - Trumark Traffic Report 11.15.22

Page 333 of 573 ends

HCM 6th Signalized Intersection Summary Existing Plus Project Condition PM 1: Fairview Ave & Sand Creek Road Timing Plan: P.M Peak Apricot TIS Synchro 11 Report
TJKM 11/02/2022
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 80 779 255 124 699 88 173 186 151 91 237 42 Future Volume (veh/h) 80 779 255 124 699 88 173 186 151 91 237 42 Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 82 803 263 128 721 91 178 192 156 94 244 43 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 222222222222
Cap, veh/h 106 1269 556 163 1381 601 220 397 336 162 336 285 Arrive On Green 0.06 0.36 0.36 0.09 0.39 0.39 0.12 0.21 0.21 0.09 0.18 0.18 Sat Flow, veh/h 1781 3554 1556 1781 3554 1546 1781 1870 1583 1781 1870 1582 Grp Volume(v), veh/h 82 803 263 128 721 91 178 192 156 94 244 43 Grp Sat Flow(s),veh/h/ln 1781 1777 1556 1781 1777 1546 1781 1870 1583 1781 1870 1582 Q Serve(g_s), s 3.4 14.2 9.9 5.3 11.8 2.9 7.4 6.8 6.5 3.8 9.3 1.7 Cycle Q Clear(g_c), s 3.4 14.2 9.9 5.3 11.8 2.9 7.4 6.8 6.5 3.8 9.3 1.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 106 1269 556 163 1381 601 220 397 336 162 336 285 V/C Ratio(X) 0.77 0.63 0.47 0.79 0.52 0.15 0.81 0.48 0.46 0.58 0.73 0.15 Avail Cap(c_a), veh/h 353 1645 720 353 1645 716 589 618 523 353 618 523 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.1 20.2 18.8 33.6 17.7 15.0 32.3 26.2 26.0 33.0 29.2 26.1 Incr Delay (d2), s/veh 4.4 1.1 1.3 3.2 0.7 0.2 2.7 2.0 2.1 1.2 6.2 0.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.5 5.4 3.3 2.3 4.3 0.9 3.1 3.0 2.4 1.6 4.5 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 39.5 21.3 20.1 36.8 18.4 15.3 35.0 28.1 28.2 34.2 35.5 26.7 LnGrp LOS DCCDBBDCCCDC
Approach Vol, veh/h 1148 940 526 381
Approach Delay, s/veh 22.3 20.6 30.5 34.2
Approach LOS CCCC
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 10.9 32.5 13.3 18.9 8.5 34.9 10.9 21.3 Change Period (Y+Rc), s 4.0 5.5 4.0 5.3 4.0 5.5 4.0 5.3 Max Green Setting (Gmax), s 15.0 35.0 25.0 25.0 15.0 35.0 15.0 25.0 Max Q Clear Time (g_c+I1), s 7.3 16.2 9.4 11.3 5.4 13.8 5.8 8.8 Green Ext Time (p_c), s 0.1 10.3 0.2 2.2 0.0 8.8 0.1 2.6 Intersection Summary
HCM 6th Ctrl Delay 24.7
HCM 6th LOS C
Notes
User approved pedestrian interval to be less than phase max green.

Attachment G - Trumark Traffic Report 11.15.22

Page 334 of 573 ends

HCM 6th AWSC Existing Plus Project Condition PM
2: Fairview Ave & Apricot Way/Sunflower Lane Timing Plan: P.M Peak Apricot TIS Synchro 11 Report
TJKM 11/02/2022
Intersection
Intersection Delay, s/veh 10.4
Intersection LOS B
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 7 10 74 15 13 14 84 214 38 14 258 8
Future Vol, veh/h 7 10 74 15 13 14 84 214 38 14 258 8
Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Heavy Vehicles, % 222222222222
Mvmt Flow 7 10 75 15 13 14 85 216 38 14 261 8
Number of Lanes 110010010010
Approach EB WB NB SB
Opposing Approach WB EB SB NB
Opposing Lanes 1211
Conflicting Approach Left SB NB EB WB
Conflicting Lanes Left 1121
Conflicting Approach Right NB SB WB EB
Conflicting Lanes Right 1112
HCM Control Delay 8.9 8.9 11.1 10.4

HCM LOS AABB

Lane NBLn1 EBLn1 EBLn2 WBLn1 SBLn1
Vol Left, % 25% 100% 0% 36% 5%
Vol Thru, % 64% 0% 12% 31% 92%
Vol Right, % 11% 0% 88% 33% 3%
Sign Control Stop Stop Stop Stop Stop
Traffic Vol by Lane 336 7 84 42 280
LT Vol 84 7 0 15 14
Through Vol 214 0 10 13 258
RT Vol 38 0 74 14 8
Lane Flow Rate 339 7 85 42 283
Geometry Grp 27752
Degree of Util (X) 0.433 0.013 0.127 0.064 0.366
Departure Headway (Hd) 4.593 6.504 5.372 5.469 4.664
Convergence, Y/N Yes Yes Yes Yes Yes
Cap 781 547 662 649 766
Service Time 2.644 4.28 3.147 3.555 2.717
HCM Lane V/C Ratio 0.434 0.013 0.128 0.065 0.369
HCM Control Delay 11.1 9.4 8.9 8.9 10.4
HCM Lane LOS BAAAB
HCM 95th-tile Q 2.2 0 0.4 0.2 1.7
Attachment G - Trumark Traffic Report 11.15.22

Page 335 of 573 ends

RESOLUTION NO. 2024- 56

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BRENTWOOD ADOPTING THE 2024/ 25 - 2028/ 29 CAPITAL
IMPROVEMENT PROGRAM ( CIP).

WHEREAS, Section 65400, et. seq., of the Government Code of the State of California requires that cities should provide for means of implementing the General Plan and the efficient expenditure of public funds relating to the implementation of public projects addressed in the General Plan; and
WHEREAS, the City of Brentwood adopted the most recent General Plan Update in July, 2014, which states the City may include General Plan items in the Capital Improvement Program ( CIP) as the City deems appropriate; and WHEREAS, General Plan policy requires inclusion of certain capital projects sponsored by the City and necessary to achieve General Plan action items in the fiveyear CIP; and WHEREAS, this CIP has as its purpose to integrate the CIP with the General Plan and other City activities, and ensure that planning for capital improvements is tied to realistic sources of income in order to finance these improvements; and WHEREAS, this CIP includes projects that have been carefully evaluated to ensure: 1) the City' s capital improvement needs are met, both now and in the future and 2) they support the City' s Mission Statement, General Plan and two- year City of Brentwood Strategic Plan; and
WHEREAS, on February 22, 2022, by Resolution 2022- 25, the City Council a) adopted the City of Brentwood Strategic Plan FY 2022/ 23 - FY 2023/ 24, and b) directed staff to incorporate strategic plan costs into the Operating and CIP Budgets, as well as in the City' s ten- year General Fund Fiscal Model; and WHEREAS, it is necessary to define improvements and anticipated construction schedules to ensure proper pre -planning, design and community review before construction begins; and a
WHEREAS, on March 4th, 2024, # City Finance staff met with the Budget Ad Hoc committee and reviewed a preliminary draft of the 2024/ 25 - 2028/ 29 CIP and staff incorporated feedback from that Ad Hoc meeting into the draft CIP; and WHEREAS, on April 9t", 2024, the proposed 2024/ 25 - 2028/ 29 CIP was presented to the City Council at the CIP Workshop and the draft CIP has been updated to incorporate Council direction from that workshop.

Attachment H - CIP 2024.25 – 2028.29 - Resolution

Page 336 of 573 ends
Page 2 of 2 ends

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Brentwood does hereby: adopt the 2024/ 25 - 2028/ 29 Capital Improvement Program as presented in Exhibit " A", including roadway, parks and trails, water, wastewater and community facilities improvements to be constructed during the next five years.

PASSED, APPROVED AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on the 28th day of May 2024 by the following vote:

AYES: Meyer, Mendoza, Pierson, Oerlemans, Mayor Bryant
NOES: None
ABSENT: None
RECUSE: None
oel R. Bryant
Mayor
ATTEST:

Margaret imberly, MMC
City Clerk
Attachment H - CIP 2024.25 – 2028.29 - Resolution
CIP Web Link - Click Here

Page 337 of 573 ends

Attachment I - Transportation Systems Management Program

Page 338 of 573 ends

Attachment I - Transportation Systems Management Program

Page 339 of 573 ends

Attachment I - Transportation Systems Management Program

Page 340 of 573 ends

CITY COUNCIL AGENDA ITEM NO. 14
Meeting Date: March 10, 2009
Subject/Title: A City-initiated General Plan amendment (GPA 09-02) to amend the Growth Management Element of the City’s General Plan to incorporate the adopted Urban Limit Line (ULL) and related references to Measure J within this element in compliance with the terms of Measure J.

Prepared by: Heidi Kline, Planning Manager
Submitted by: Casey McCann, Community Development Director

RECOMMENDATION
Adopt a resolution approving a City-initiated General Plan amendment (GPA 09-02) to amend the Growth Management Element of the City’s General Plan to incorporate the adopted Urban Limit Line (ULL) and related references to Measure J within this element in compliance with the terms of Measure J.

BACKGROUND
In November 2004, voters in Contra Costa County extended the Measure C sales tax until 2034 through the passage of Measure J. On January 8, 2008, the City Council approved adoption of the County-approved Urban Limit Line (ULL) in compliance with the provisions of Measure J. In order for the City to be in compliance with the statutory requirements of Measure J by the deadline of April 1, 2009, the City’s Growth Management Element of its General Plan must be amended to include a reference to the adopted ULL. This is a requirement of all cities in Contra Costa County.

PROJECT DESCRIPTION
The following text is proposed for insertion within the Growth Management Element of the City’s General Plan and a new Action Program 3.1.9 added referencing adherence of development within the City to the adopted Urban Limit Line (ULL). The purpose of including reference to the previously-adopted ULL is for compliance with Measure J which is required for the City to receive certain transportation revenue collected from the sales tax authorized by Measure J. “In November 2004, voters in Contra Costa County extended the Measure C sales tax until 2034 through the passage of Measure J. While this new measure retains many of the components of the Measure C GMP, there are some changes, most notably the requirement for the adoption of an Urban Limit Line (ULL) for each jurisdiction.

At its January 8, 2008 meeting, the City Council adopted the Contra Costa Measure L Voterapproved Urban Limit Line (Resolution 2008-03) as the City of Brentwood’s Urban Limit Line which was approved by the majority of Brentwood voters in November 2006. This Urban Limit Line for Brentwood is hereby incorporated within the City’s Growth Management Element and the configuration is as shown on the City’s General Plan Land Use Map. Any changes to the ULL must be completed in accordance with City Council Resolution 08-03 and consistent with Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 341 of 573 ends

2 the provisions of Measure J. As with Measure C, compliance with Measure J requires the City continue to participate in the regional fee program (ECCRFFA & ECFA) and collect regional fees for improvements to regional routes (SR 4 ByPass and SR 4). Action program 3.1.9 would ensure that all new development occurs within the City’s adopted ULL.” Added: Action Program 3.1.9 Urban Limit Line (ULL): Ensure that all new development shall occur within the City’s adopted Urban Limit Line.

Additionally, replaced “basic routes” with “non-regional routes” throughout the text. The Contra Costa Transportation Authority (CCTA) is trying to discontinue use of the term “basic” routes, since it is a non-standard and confusing term.

DISCUSSION
The proposed General Plan amendment is a fairly straightforward item in that it incorporates the previously-adopted ULL into the City’s Growth management Element. This amendment is merely a technical clean-up item done to ensure that the City is in compliance with all the requirements of Measure J by April 1, 2009 and remains eligible for its portion of transportation funding. Brentwood’s share of funding in the past fiscal year was $473,961. The draft revisions to the City’s Growth Management Element have been reviewed by CCTA staff who has determined that it is consistent with the intent of Measure J.

ENVIRONMENTAL DETERMINATION:

Consideration of this application is determined to be covered by the general rule that the California Environmental Quality Act (CEQA) applies only to projects which have the potential for causing a significant effect on the environment. In this case, where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA (CEQA Guidelines Section 15061(b)(3)), in that the project is a technical update to incorporate the reference to the previously-adopted ULL into the City’s Growth Management Element of its General Plan. A negative declaration was adopted at the time of approval of the ULL by the City Council in January 2008.

FISCAL IMPACT
There is no fiscal impact associated with approval of this General Plan amendment per se.

However, should the amendment not be approved, the City may become ineligible to receive approximately $11,849,025 of Measure J funds over the next 25 years.

Attachments:

1. Draft Resolution

2. Revised Growth Management Element

3. Land Use map showing Urban Limit Line
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 342 of 573 ends

1 CITY COUNCIL RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRENTWOOD APPROVING A GENERAL PLAN AMENDMENT (GPA 09-02) TO AMEND THE GROWTH MANAGEMENT ELEMENT OF THE CITY’S GENERAL PLAN TO

INCORPORATE THE ADOPTED URBAN LIMIT LINE (ULL) AND RELATED

REFERENCES TO MEASURE J WITHIN THE ELEMENT IN COMPLIANCE WITH THE

TERMS OF MEASURE J
WHEREAS, the Measure J (2004) Transportation Expenditure Plan includes a Growth Management Program which contains an urban limit line component mandating that local jurisdictions must adopt and continuously comply with a voter approved urban limit line no later than April 1, 2009 in order to receive their shares of Measure J Local Street Maintenance and Improvement Funds and to be eligible to receive Measure J Transportation for Livable Community funds; and
WHEREAS, Measure J also includes Principles of Agreement for Establishing the Urban Limit Line (the ULL Principles) as Attachment A to the Growth Management Program, incorporated therein by reference; and
WHEREAS, the ULL Principles, as amended by the Contra Costa Transportation Authority on November 15, 2006, state that a local jurisdiction may adopt a County Urban Limit Line, which is defined as the Urban Limit Line adopted by the Contra Costa County Board of Supervisors and passed by the voters at a countywide election (after November 2004); and WHEREAS, Measure L (2006), the Contra Costa County Board of Supervisor Urban Limit Line, was passed by a majority of voters in Contra Costa at the November 7, 2006 election; and
WHEREAS, the Measure L Urban Limit Line was also approved by a majority of the voters in the City of Brentwood at the November 7, 2006 election, as certified by the County Clerk; and
WHEREAS, on October 18, 2007, the City of Brentwood Land Use and Development Committee members recommended that the County voter-approved Urban Limit Line be adopted by the City Council; and
WHEREAS, on January 8, 2008, the City of Brentwood adopted the Measure L Urban Limit Line (referred hereinafter as the County Urban Limit Line) as its Urban Limit Line specifically as it applies to the City of Brentwood boundaries for the purpose of compliance with the Measure J Growth Management Program; and
WHEREAS, the City of Brentwood now amends the General Plan’s Growth Management Element to incorporate the adopted Urban Limit Line (ULL) and related references to Measure J within this Element in compliance with the terms of Measure J; and WHEREAS, on February 3, 2009, the Planning Commission the Planning Commission of the City of Brentwood considered this amendment at a public hearing and considered the staff report, all accompanying information, and testimony received, and recommended that the City Council approve the general plan amendment, by adopting Resolution No. 09-03; and Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 343 of 573 ends

2 WHEREAS, a notice of public hearing was distributed to all property owners of record within 300 feet of the project site, and published in the Brentwood Press on February 27, 2009, in accordance with City policies and Government Code Section 65090; and WHEREAS, consideration of this application is determined to be covered by the general rule that the California Environmental Quality Act (CEQA) applies only to projects which have the potential for causing a significant effect on the environment. In this case, where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA (CEQA Guidelines Section 15061(b)(3)), in that the project is a technical update to incorporate the reference to the previously-adopted ULL into the City’s Growth Management Element of its General Plan. A negative declaration was adopted at the time of approval of the ULL by the City Council in January 2008; and
WHEREAS, the City Council considered this request at a public hearing at its regular meeting of March 10, 2009, and considered the staff report, the Planning Commission recommendation, all accompanying information, and testimony received from all interested parties.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Brentwood:

A. Hereby finds that:

1. The proposed amendment is deemed to be in the public interest. The amendment would fulfill the requirements of the voter-approved Measure J passed in November 2004.

2. The proposed General Plan amendment is consistent and compatible with the rest of the General Plan, including the Circulation Element, and any implementation programs that may be affected.

3. The potential impacts of the proposed amendment have been assessed and have been determined not to be detrimental to the public health, safety or welfare in that this text amendment is simply codifies a previously-approved ballot measure.

4. The proposed amendment has been processed in accordance with the applicable provisions of the California Government Code and the California Environmental Quality Act (CEQA). In this case, where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA (CEQA Guidelines Section 15061(b)(3)), in that the project is a technical update to incorporate the reference to the previously-adopted ULL into the City’s Growth Management Element of its General Plan.

B. Hereby approves General Plan Amendment No. 09-02 to amend the Growth Management Element of the City’s General Plan as reflected in the attached Exhibit “A”.

PASSED, APPROVED AND ADOPTED by the City Council of the City of Brentwood at its regular meeting held on the 10th day of March, 2009, by the following vote:

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 344 of 573 ends

1 GROWTH MANAGEMENT ELEMENT
Updated November 2001 and March 2009
Attachment J - Voter-Approved ULL and Measure J Growth Management Attachment #2 Element

Page 345 of 573 ends

2 GROWTH MANAGEMENT ELEMENT

SETTING
Growth management is the use of a wide range of techniques to determine the amount, type, and rate of development desired by the community and to channel that growth into designated areas.

A growth management system is commonly organized into a set of goals, objectives, policies, and performance standards that guide the physical development of a community.

Growth management systems promote a variety of environmental, social, and economic goals, including balancing the service costs and revenues associated with development; protecting environmental and aesthetic qualities; encouraging efficient land, water and energy resources; preserving community identity; and protecting the economic base of the community.

Development pressures continue to increase as Brentwood is considered a high quality, affordable alternative to housing located elsewhere in the Bay Area. While this development pressure is increasing, Brentwood has retained its small town nature, including features such as a stable downtown commercial core and large tracts of undeveloped land surrounding the community.

Nonetheless, development has increased traffic levels and the need for improved facilities and services. For instance, more traffic signalization is now necessary, and additional roadway improvements will soon be needed. Other community facilities, further addressed in the Public Facilities Chapter of this General Plan, also require improvements and expansion.

Brentwood citizens have indicated overall goals for the future of the City, which can be attained through development of a growth management system. These goals include:
• Retaining the small town character of Brentwood;
• Strengthening the downtown as a destination point;
• Providing a higher number of jobs while limiting annual housing growth; and • Providing adequate public facilities and services.

This Growth Management Element is part of the General Plan because the City wants to reach these goals and because Contra Costa County voters approved a 0.5% sales tax increase in November 1988, commonly known as “Measure C,” that includes both Transportation Improvement and Growth Management Programs. The overall goals of the Measure C program are:
• To relieve congestion created by past development through road and transit improvements funded by the proceeds of the sales tax increase.
• To prevent future development decisions resulting in deterioration of public services and acceptable traffic performance standards.

To be eligible for its share of revenue generated under Measure C, the City of Brentwood must commit itself, as matter of public policy, to carrying out the following objectives:

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 346 of 573 ends

3 • Manage congestion by adopting and applying traffic service standards for streets, roads, and Regional Routes.
• Adopt policies for fire protection, police, parks, water, flood control, and sanitary sewer service level standards that will be met as the City grows.

The City of Brentwood continues to demonstrate a commitment to growth management while providing adequate levels of public services. This commitment is demonstrated through adoption of this element, which conforms to Measure C (Contra Costa Transportation Improvement and Growth Management Program) and Proposition 111, a state measure that provides funding to local governments on the basis of compliance with the Congestion Management Program (CMP).

In Contra Costa County, the CMP requirements have been incorporated into the Action Plan for East Contra County. Brentwood is participating in the preparation of the Action Plan for East Contra Costa County, along with the cities of Pittsburg, Antioch, and with Contra Costa County.

The key objective of the Action Plan is to maintain levels of service for roads and other public facilities. Failure to meet established standards could result in a reduced level of funding from Measure C and State sources.

The enactment of a Residential Growth Management Program (RGMP) in July 2001 illustrates the City’s commitment to growth management. The RGMP establishes a residential growth allocation system that ensures that growth is high quality, orderly and efficient, while simultaneously achieving the City’s appropriate share of the regional need for housing.

In November 2004, voters in Contra Costa County extended the Measure C sales tax until 2034 through the passage of Measure J. While this new measure retains many of the components of the Measure C GMP, there are some changes, most notably the requirement for the adoption of an Urban Limit Line (ULL) for each jurisdiction.

At its January 8, 2008 meeting, the City Council adopted the Contra Costa Measure L Voterapproved Urban Limit Line (Resolution 2008-03) as the City of Brentwood’s Urban Limit Line which was approved by the majority of Brentwood voters in November 2006. This Urban Limit Line for Brentwood is hereby incorporated within the City’s Growth Management Element and the configuration is as shown on the City’s General Plan Land Use Map. Any changes to the ULL must be completed in accordance with City Council Resolution 08-03 and consistent with the provisions of Measure J. As with Measure C, compliance with Measure J requires the City continue to participate in the regional fee program (ECCRFFA & ECFA) and collect regional fees for improvements to regional routes (SR 4 ByPass and SR 4). Action program 3.1.9 would ensure that all new development occurs within the City’s adopted ULL.

FORECAST
The City of Brentwood shares Contra Costa County's concern about managing and planning for future growth and development. The City’s intent is to ensure that roadways, parks, police, fire protection, sanitary sewer, water and flood control facilities are provided in an amount and manner that best serves the existing and future residents of the community.

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 347 of 573 ends

4 The City of Brentwood plans to provide for orderly and efficient growth within the Brentwood Planning Area. The City’s planned buildout population is approximately 76,226 people. The City intends to ensure that new developments will be served with adequate public infrastructure and that future services and infrastructure will be provided without placing a burden on existing residents and businesses.

This Growth Management Element establishes performance standards for public facilities and services. Traffic levels of service (LOS) and performance standards for fire protection, police, parks, sanitary facilities, water and flood control are included. By adopting and implementing this element, the City of Brentwood establishes a comprehensive, long-range program to meet the demands for public facilities generated by new development through master plans, capital improvement programs and development mitigation programs.

New growth and development in the City of Brentwood will increase the service and facility requirements within the City as well as those of other public agencies. All land use decisions have an effect on future municipal tax revenues and on the costs of delivering services. As long as Brentwood continues to grow in population and expand its economic base, the City's operating and capital budget will have to respond to an increased demand for services and improvements.

However, the fiscal burden to the City’s operating budget will be offset by increased revenue, primarily in the form of sales and property tax, from new development. Fiscal impact estimates suggest that if the General Plan Update buildout is achieved, the City’s operating budget will experience a surplus. The continued growth of single family housing as the predominant development patterns in the General Plan will have a significant positive impact on property tax revenue to the City. Additionally, the targeted growth in retail space, and therefore in sales tax, will contribute to the positive net outcome of the Plan at buildout. The gains in these two revenue sources will contribute to offsetting the expected cost increases of serving new residents and new employment generating development, resulting in an estimated fiscal surplus for the City. The City also has in place development fees intended to offset the impact to the City’s capital budget. The growth management program will allow the City of Brentwood to manage urban expansion without burdening the community's resources and revenues, and constraining economic development.

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 348 of 573 ends

5 GOALS AND POLICIES
The following goals, policies, action programs and implementation mechanisms embody the direction and requirements of the City of Brentwood’s Growth Management Program.

GOAL 1: FACILITIES AND SERVICES
Adequate public facilities and services that are maintained or improved as Brentwood grows.

Policy 1.1 Municipal Services: Provide adequate public infrastructure (i.e. sewer, water, and storm drain) to meet the needs of existing and future development. (See Infrastructure Element.) Action Program
Responsible
Agency/
Department
Time Frame
Implementation
Mechanism
(Numbers refer to descriptions of
mechanisms, which follow table)

1.1.1 Master Infrastructure Plan:

The City shall only approve
developments which are in
conformance with the following
performance standards provided in the
Master Infrastructure Plan:
a) For sanitary facilities: The
capability to collect and treat
sewage according to the standards
set forth in the City’s National
Pollution Discharge Elimination
System (NPDES) permit issued by
the Regional Water Quality Control
Board. Average daily effluent
flows have been determined for
various land use types in the City’s
Sewer Master Plan.
b) For water facilities: The City shall
assure sufficient capacity to
provide quality water that meets or
exceeds the standards set forth by
the California Department of
Health Services to all potable water
customers in the City.
c) For flood control facilities: Until
and unless FEMA maps flood zone
areas within Brentwood, standards
for the containment of flood events
will be based upon the size of the
effected watershed.

City of
Brentwood
Engineering
Department
Modify and
update the
Master
Infrastructure
Plan as needed
Other actions
are ongoing
ƒ Master Infrastructure
Plans: Sewer Master
Plan; Water Master
Plan; and Reclaimed
Water Master Plan (18,
22)
ƒ Capital Improvements
Program (4)
ƒ Intergovernmental
Coordination (16)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 349 of 573 ends

6 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.1 Municipal Services (continued)
Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.1.2 Sizing of Utilities: Through
development review, the City shall
ensure that utilities are adequately
sized to accommodate the proposed
development and, if applicable, allow
for anticipated future extensions.

City of
Brentwood
Engineering
Department
Ongoing ƒ Capital Improvements
Program (4)
ƒ Development Review
(9)

1.1.3 Development Proposals:

Individual developments shall be
required to develop comprehensive
infrastructure plans for City review and
approval as part of an application
submittal.

City of
Brentwood
Engineering
Department
Ongoing ƒ Development Review
(9)
ƒ CEQA Review (2)

1.1.4 Infrastructure Capacity:

Existing water and wastewater
facilities shall be expanded to
accommodate existing and planned
future development.

City of
Brentwood
Engineering
Department
Ongoing ƒ Capital Improvements
Program (4)
ƒ Intergovernmental
Coordination (16)

1.1.5 Correct Inadequacies: The
City shall continue to utilize a Capital
Improvements Program that establishes
priorities and corrects existing
inadequacies in the City’s
infrastructure system.

City of
Brentwood
Administration,
Community
Development,
Engineering,
Finance, and
Parks and
Recreation
Departments
Adopt CIP
annually
ƒ 5-year Capital
Improvements Program
(4)

1.1.6 Cost of Infrastructure: Require
new development to pay its fair share
of the cost of on- and off-site public
infrastructure and services generated
by new demand. This shall include
installation of necessary public
facilities, payment of impact fees, and
participation in a Capital Improvement
Financing Program (CIFP).

City of
Brentwood
Engineering
and Finance
Departments
Ongoing ƒ Capital Improvements
Program (4)
ƒ Capital Improvement
Financing Program (3)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 350 of 573 ends

7 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.1 Municipal Services (continued)
Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.1.7 Reimbursement: The City may
require developments to install off-site
facilities that are in excess of a
development’s fair share. However, the
City shall establish a funding
mechanism to reimburse the developer
for the amount in excess of the fair
share costs.

City of
Brentwood
Community
Development,
Engineering
and Finance
Departments
Ongoing ƒ Capital Improvements
Program (4)
ƒ Capital Improvement
Financing Program (3)
ƒ Fee Credits (11)

1.1.8 Other Funding Sources: The
City shall apply for State, Federal, and
regional funding sources set aside to
finance infrastructure costs.

City of
Brentwood
Community
Development
and Parks and
Recreation
Departments
Ongoing ƒ Grant Programs (15)

1.1.9 Orderly Growth: Ensure that the
rate of growth is consistent with the
ability to provide adequate municipal
services.

City of
Brentwood
Community
Development
Department
Ongoing ƒ Residential Growth
Management Program
(21)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 351 of 573 ends

8 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.2 School Facilities: The City shall continue to work cooperatively with responsible Brentwood school districts to ensure needed school facilities are provided in conjunction with new residential development.

Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.2.1. Coordination: The City shall
work cooperatively with responsible
Brentwood school districts to
coordinate development to ensure the
adequate provision of school facilities
and encourage the establishment of a
School Facility Master Plan.

City of
Brentwood,
LUHSD,
BUSD
Review future
school sites on
the General
Plan Land Use
Map and revise
as needed
Ongoing
ƒ Intergovernmental
Coordination (16)

1.2.2 Fees: The City shall ensure that
school facility impact fees are collected
and shall work with the developers and
the school districts to establish
mitigation measures to ensure that
adequate school facilities will be
available.

City of
Brentwood
Community
Development
Department
Ongoing ƒ Intergovernmental
Coordination (16)
ƒ Development Review (9)

1.2.3 Financing Programs: The City
shall require developer financing
through a Capital Improvement
Financing Program (i.e., Assessment
District, etc.) in accordance with
Zoning Ordinance 17.805, Phased
Development Plan.

City of
Brentwood
Engineering
and Finance
Departments
Ongoing ƒ Capital Improvement
Financing Program (3)
ƒ Development
Regulations (Zoning) (8)

1.2.4 Alternative Funding: The City
shall work with the school districts to
consider alternative funding programs
for school facilities construction and
provision of educational programs.

City of
Brentwood,
LUHSD,
BUSD
Ongoing ƒ Intergovernmental
Coordination (16)

1.2.5 Distribution: Strongly
encourage dispersal of schools
throughout the City based on ongoing
discussions with the local school
districts.

City of
Brentwood
Community
Development
Department
Ongoing ƒ General Plan Land Use
Map
ƒ Intergovernmental
Coordination

1.2.6 Orderly Growth: Ensure that the
rate of growth is consistent with the
ability to provide adequate school
services.

City of
Brentwood
Community
Development
Department
Ongoing ƒ Residential Growth
Management Program
(21)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 352 of 573 ends

9 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.3 Park Planning: A variety of park facilities shall be provided in a timely manner in accordance with the pace of development as per the Parks, Trails, and Recreation Master Plan.

Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.3.1 Master Plan: The City shall
prepare a Parks, Trails and Recreation
Master Plan that:
ƒ Establishes funding;
ƒ Adopts standards; and
ƒ Addresses maintenance.

City of
Brentwood
Parks and
Recreation
Department
Adopt the
Parks, Trails
and Recreation
Master Plan
concurrently
with the
General Plan
Once adopted,
update every 2
years and
modify as
needed
ƒ Parks, Trails and
Recreation Master Plan
(19)

1.3.2 Conditions: The City shall
consider the effects of new
development on park, trail and
recreation facilities and programs, and
apply conditions to ensure
development satisfies the policies of
the Parks, Trails and Recreation
Master Plan.

City of
Brentwood
Parks and
Recreation and
Community
Development
Departments
Ongoing ƒ Development Review (9)

1.3.3 Coordination: The City shall
work with the East Bay Regional Park
District to coordinate development
with the provision of adequate regional
park and recreation facilities. The City
shall support the dedication and/or
acquisition of land for regional park
and trail purposes, as identified in the
EBRPD Master Plan, when consistent
with the City Parks, Trails and
Recreation Master Plan, as a condition
of new development.

City of
Brentwood
Parks and
Recreation and
Community
Development
Departments
Ongoing ƒ Intergovernmental
Coordination (16)
ƒ Development Review (9)

1.3.4 Fees: The City shall ensure that
park facility impact fees are collected
for new development that increases
demand for parks and recreation
facilities.

City of
Brentwood
Parks and
Recreation and
Finance
Departments
Ongoing ƒ Development Review (9)
ƒ Development Fees and
Dedications (7)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 353 of 573 ends

10 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.3 Park Planning (continued)
Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.3.5 CIFP: The City shall require all
new developments to participate in a
Capital Improvement Financing
Program and shall make the required
findings of Section 17.805 of the City
Zoning Ordinance (Phased
Development Plan) that the project will
not create excess demand for park
facilities.

City of
Brentwood
Engineering
and
Community
Development
Departments
Ongoing ƒ Capital Improvement
Financing Program (3)
ƒ Development
Regulations (Zoning) (8)

1.3.6 Park Acreage: The City shall
provide at least five acres of parkland
citywide per 1,000 population to
accommodate recreational open space
needs. The City shall consider the
effects of new development on park
facilities and recreation programs and
condition them appropriately.

City of
Brentwood
Community
Development
and Parks and
Recreation
Departments
Ongoing ƒ General Plan Land Use
Map (14)
ƒ Parks, Trails and
Recreation Master Plan
(19)
ƒ Development Review (9)
ƒ Development Fees and
Dedications (7)

1.3.7 Maintenance Costs: The City
shall pursue all available funding
sources for maintenance of parks,
including but not limited to user fees,
assessment districts, and homeowners’
associations.

City of
Brentwood
Parks and
Recreation and
Finance
Departments
Ongoing ƒ Capital Improvement
Financing Program (3)
ƒ Landscape and Lighting
District (17)

1.3.8 Joint Use: Pursue joint use of
schools and parks and stormwater
detention facilities as secondary
recreational uses.

City of
Brentwood,
LUHSD,
BUSD
Ongoing ƒ Development Review (9)
ƒ Intergovernmental
Coordination (16)

1.3.9 Distribution: Encourage the
dispersal of parks and recreation
facilities throughout the City.

City of
Brentwood
Parks and
Recreation and
Community
Development
Departments
Review Parks,
Trails and
Recreation
Master Plan
every 2 years
and update as
needed
Ongoing
ƒ General Plan Land Use
Map (14)
ƒ General Plan Bikeways
and Trails Map (13)
ƒ Development Review (9)
ƒ Parks, Trails and
Recreation Master Plan
(19)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 354 of 573 ends

11 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.3 Park Planning (continued)
Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.3.10 Orderly Growth: Ensure that
the rate of growth is consistent with the
ability to provide adequate parks.

City of
Brentwood
Community
Development
Department
Ongoing ƒ Residential Growth
Management Program
(21)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 355 of 573 ends

12 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.4 Public Safety (Police and Fire): Police and fire protection services shall be provided in a manner that ensures that adequate response times are maintained for emergencies.

Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.4.1 Police Services: Capital
facilities and personnel shall be
provided sufficient to maintain a force
level of at least 1.5 officers per 1,000
population.

City of
Brentwood
Police
Department
Ongoing ƒ Annual City Budget (1)

1.4.2 Fire Protection Services: The
Fire District shall strive to reach a
maximum driving time of 3 minutes
and/or 1.5 miles from the first-due
station, and three (3) paid firefighters
(per apparatus) to be maintained in all
central business district (CBD), urban
and suburban areas.

City of
Brentwood,
East Diablo
Fire Protection
District and
Contra Costa
County
Ongoing ƒ Intergovernmental
Coordination (16)
ƒ Fire Service Response
Coverage Study (12)
ƒ Development Review (9)
ƒ General Plan Land Use
Map (14)

1.4.3 Response Time: The Fire
District shall strive to achieve a total
response time (dispatch plus running
and set-up time) of five minutes in
CBD, urban and suburban areas for 90
percent of all emergency responses.

East Diablo
Fire Protection
District, Contra
Costa County,
and City of
Brentwood
Daily on an
ongoing basis
ƒ Intergovernmental
Coordination (16)
ƒ Fire Service Response
Coverage Study (12)
ƒ Development Review (9)
ƒ General Plan Land Use
Map (14)

1.4.4 Upgrades: Needed upgrades to
fire facilities and equipment shall be
identified as part of project
environmental review and area
planning activities, in order to reduce
fire risk and improve emergency
response in the City of Brentwood.

City of
Brentwood and
East Diablo
Fire Protection
District
Ongoing ƒ Capital Improvements
Program (4)
ƒ Development Review (9)
ƒ Intergovernmental
Coordination (16)

1.4.5 Coordination: The City shall
work with the Fire District and Police
Department for review and comments
on all development plans.

City of
Brentwood
Community
Development
and Police
Departments,
East Diablo
Fire District
Ongoing ƒ Development Review (9)
ƒ Intergovernmental
Coordination (16)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 356 of 573 ends

13 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.4 Public Safety (Police and Fire) (continued)
Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.4.6 Fees: The City shall ensure that
impact fees are collected and shall
work with the developers to establish
mitigation measures to ensure that
adequate facilities will be available.

City of
Brentwood
Community
Development
Department
Ongoing ƒ Development Review (9)
ƒ Development Fees and
Dedications (7)
ƒ Intergovernmental
Coordination (16)

1.4.7 Capital Improvement
Financing Program (CIFP): The
City shall require all new developments
to participate in a Capital Improvement
Financing Program and shall make the
required findings of Section 17.805 of
the City Zoning Ordinance (Phased
Development Plan) that development
projects will not create excess demand
for police and fire services.

City of
Brentwood
Engineering
and
Community
Development
Departments
Ongoing ƒ Capital Improvement
Financing Program (3)
ƒ Development
Regulations (Zoning) (8)
ƒ Development Review (9)

1.4.8 Needs Study: Within 12 months
of adoption of this Growth
Management Element, a Standards of
Response Coverage Study shall be
prepared to analyze the equipment,
personnel, and facility requirements for
various levels of service and associated
costs to ensure that adequate fire and
emergency services are maintained as
the City grows. The study shall be
periodically reviewed and updated as
needed.

City of
Brentwood and
East Diablo
Fire District
Complete study
within 12
months of
General Plan
Update
adoption
Once study is
completed,
review and
update as
needed
ƒ Fire Service Response
Coverage Study (12)
ƒ Intergovernmental
Coordination (16)
ƒ Development Review (9)

1.4.9 Orderly Growth: Ensure that
the rate of growth is consistent with the
ability to provide adequate public
safety services
City of
Brentwood
Community
Development
Department
Ongoing ƒ Residential Growth
Management Program
(21)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 357 of 573 ends

14 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.5 Traffic Service Standards: Roadways shall be provided in the City to maintain the following service standards:

Routes of Regional Significance. The following routes in Brentwood shall be considered Routes of Regional Significance and the City shall work with the TRANSPLAN Committee and the Contra Costa Transportation Authority (CCTA) to ensure they are designated appropriately. ƒ State Highway 4
ƒ Brentwood Boulevard / State Highway 4
ƒ Highway 4 Bypass
ƒ Walnut Boulevard / Vasco Road
ƒ Lone Tree Way
ƒ Balfour Road
The City will participate with both agencies in developing Action Plans for each of these routes.

These Action Plans will set Traffic Service Objectives to be met for each of these routes.

Non-regional Routes. All roads not designated as Routes of Regional Significance are considered to be Non-regional Routes. Signalized intersections on Non-regional Routes are required to meet the level of service standards shown in the following chart.

LEVEL OF SERVICE STANDARDS

FOR SIGNALIZED INTERSECTIONS OF NON-REGIONAL ROUTES
Route Classification Level of Service Volume to Capacity Ratio (in %)* Rural (Rural Byway) C 71-75%
Semi-Rural (Collector) C 76-80%
Suburban (Minor Arterial ) D 81-85%
Urban (Major Arterial ) D 86-90%
Central Business District E 91-95%
*Note: Volume to Capacity ratios are determined by CCTA and may change over time.

Levels of service standards are considered to be met if:

1. Measurement of actual conditions at the intersections indicates that operations are equivalent to or better than those specified in the standard, or

2. The City has, in its adopted five-year Capital Improvements Program or Fee Program, included project(s) which, when constructed, will result in operations better than or equivalent to those specified in the standard.

No project shall cause the level of service standards specified above to be exceeded unless a Finding of Special Circumstances is made by the City.

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 358 of 573 ends

15 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.5 Traffic Service Standards (continued)
Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.5.1 Mitigation Fee: The City will
adopt, implement, and maintain a
development mitigation fee that covers
the cost of mitigating the
development's share of improvements
on non-regional and regional routes as
well as the cost of maintaining
Brentwood's identified service and/or
performance standards.

City of
Brentwood
Engineering
and Finance
Departments
Modify fee
within 12
months of
General Plan
Adoption if
necessary and
annually
monitor
thereafter
ƒ Development fees and
dedications (7)
ƒ Capital Improvement
Financing Program (3)

1.5.2 Action Plans: The City may
consider amendments to its General
Plan, Zoning Ordinance, Capital
Improvements Program or other
relevant documents to ensure the East
County Action Plan is implemented
and to ensure standards on Nonregional Routes are met.

City of
Brentwood
Community
Development
Department,
CCTA and

TRANSPLAN
Ongoing ƒ Capital Improvements
Program (4)
ƒ Intergovernmental
Coordination (16)

1.5.3 Project Funding: Transportation
projects intended to meet or maintain
Level of Service standards, to
implement Action Plans for Regional
Routes, and to provide mitigation for
Intersections Subject to Findings of
Special Circumstances, may be funded
through use of Local Road
Improvement and Maintenance Funds
allocated by the Contra Costa
Transportation Authority. In no case
will revenue from this source replace
private developer funding for
transportation projects determined to
be required for new development to
meet or maintain existing standards.

City of
Brentwood
Community
Development
and
Engineering
Departments,
CCTA
Ongoing ƒ Intergovernmental
Coordination (16)
ƒ Development Review (9)
ƒ Capital Improvement
Financing Program (3)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 359 of 573 ends

16 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.5 Traffic Service Standards (continued)
Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.5.4 Capital Improvement
Programs (CIP): Capital projects
sponsored by the City and necessary to
maintain and improve traffic operations
will be included in the five year Capital
Improvements Program that is annually
reviewed by the City Council. Funding
sources for such projects as well as
intended project phasing will be
generally identified in the CIP.

City of
Brentwood
Engineering
and Finance
Departments
Review and
revise the CIP
as needed
annually
Ongoing
ƒ 5-year Capital
Improvements Program
(4)

1.5.5 Conflict Resolution: The City
will participate in the Contra Costa
Transportation Authority's conflict
resolution process as needed to resolve
disputes related to the development and
implementation of Actions Plans and
their programs described in this
Element.

City of
Brentwood and
CCTA
Ongoing ƒ Intergovernmental
Coordination (16)

1.5.6 Local Actions: Following
adoption of Regional Route Action
Plans by TRANSPLAN and the Contra
Costa Transportation Authority, the
City will implement specified local
actions in a timely manner, consistent
with adopted Action Plans.

City of
Brentwood,

TRANSPLAN,
and CCTA
Implement
local actions
within 12
months of
Regional Route
Action Plans
adoption
ƒ Intergovernmental
Coordination (16)

1.5.7 Orderly Growth: Ensure that
the rate of growth is consistent with the
ability to provide adequate
transportation services.

City of
Brentwood
Community
Development
Department
Ongoing ƒ Residential Growth
Management Program
(21)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 360 of 573 ends

17 GOAL 1: FACILITIES AND SERVICES (continued)
Policy 1.6 Growth Management: The City will require provision of concurrent infrastructure to address the impacts of development projects.

Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

1.6.1 Concurrent Infrastructure:

The City will ensure that final
development approvals (tentative
maps, final maps, building permits,
occupancy permits) are not issued
unless the City is assured that adequate
infrastructure (wastewater, water, flood
control, parks, trails, police, fire,
emergency services, and public
utilities) is in place or will be in place
concurrent with the need for such
infrastructure. Adequacy of roadways
is addressed by Policy 1.5.

City of
Brentwood
Community
Development,
Engineering,
Parks and
Recreation, and
Police
Departments
and East Diablo
Fire District
Ongoing ƒ Development
Regulations (Zoning) (8)
ƒ Development Review (9)
ƒ Intergovernmental
Coordination (16)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 361 of 573 ends

18 GOAL 2: JOB DEVELOPMENT
Job growth that balances the existing and expected future residential growth within the City.

Policy 2.1 Adequate Land: Ensure that adequate land is available for a variety of job-creating uses within the City in order to ensure 1.5 jobs per household.

Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

2.1.1 General Plan: The City shall
maintain adequate land in the General
Plan Land Use Map for new jobcreating uses and expansion of existing job-creating uses.

City of
Brentwood
Community
Development
Department and
Economic
Development
Staff
Revise the
General Plan
every 5 years
Ongoing
ƒ General Plan Land Use
Map (14)
ƒ Development
Regulations (Zoning) (8)

2.1.2 Zoning: Ensure that adequate
land is zoned for industrial,
commercial, office and mixed-use
development.

City of
Brentwood
Community
Development
Department and
Economic
Development
Staff
Review the
Zoning Map
and revise as
needed on an
ongoing basis
ƒ Development
Regulations (Zoning) (8)
ƒ Specific Plans (23)

2.1.3 Land Ratio: Maintain a specific
ratio of the amount of land zoned for
commercial, office and business park
development compared with land for
residential development. Determine
and update the ratio based on the
average number of jobs created per
square feet of various types of jobcreating uses. Review the application of the ratio annually to ensure that the
intent of the General Plan is being
achieved.

City of
Brentwood
Community
Development
Department and
Economic
Development
Staff
Review the
Zoning Map
and revise as
needed on an
ongoing basis
ƒ General Plan Land Use
Map (14)
ƒ Development
Regulations (Zoning) (8)
ƒ Specific Plans (23)
ƒ Economic Development
Strategic Plan (10)
Policy 2.2 Link between Residences and Jobs: Create a system which links the number of residential units approved to the amount of job-generating development that is approved.

Policy 2.3 Funding for Economic Development: Pursue funding for existing and new economic development programs.

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 362 of 573 ends

19 GOAL 3: DEVELOPMENT PATTERNS
Balanced, efficient, diverse and high quality development patterns within the boundaries of the City.

Policy 3.1 Smart Growth Principles: Encourage development patterns based on Smart Growth and the Ahwahnee Principles.

Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

3.1.1 Mixed-Use Development:

Strongly encourage mixed-use
development that includes a variety of
housing types, office and retail use.

Ensure land use designations are in
place to provide for mixed use
development that meets community
needs and enables complementary uses
to be placed in close proximity to one
another on the same site or adjacent
sites.

City of
Brentwood
Community
Development
Department and
Economic
Development
Staff
Review the
Zoning Map
and General
Plan every 5
years and revise
as necessary
Ongoing
ƒ Development
Regulations (Zoning) (8)
ƒ Development Review
(9)
ƒ Design Guidelines (6)
ƒ Specific Plans (23)

3.1.2 Transit Oriented Development:

Encourage new development that is
convenient to transit lines in order to
reduce automobile reliance.

City of
Brentwood and
Tri Delta
Transit
Ongoing ƒ Development Review
(9)
ƒ Development
Regulations (Zoning) (8)
ƒ Specific Plans (23)
ƒ Intergovernmental
Coordination (16)

3.1.3 Well-Defined Edges: Maintain
well-defined edges around the City in
the form of natural buffers, open space
or agricultural land.

City of
Brentwood,
City of
Antioch, City
of Oakley and
Contra Costa
County
Ongoing ƒ General Plan Land Use
Map (14)
ƒ Development
Regulations (Zoning) (8)
ƒ Design Guidelines (6)
ƒ Intergovernmental
Coordination (16)
ƒ Development Review
(9)

3.1.4 Downtown Focus: Maintain the
Downtown as a center of commercial,
civic and recreational uses, and
preserve the character of the City’s
Downtown.

City of
Brentwood
Community
Development,
Parks and
Recreation and
Engineering
Departments
Ongoing ƒ Redevelopment Plan
(20)
ƒ Development
Regulations (Zoning) (8)
ƒ Development Review
(9)
ƒ Design Guidelines (6)
ƒ Specific Plans (23)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 363 of 573 ends

20 GOAL 3: DEVELOPMENT PATTERNS (continued)
Policy 3.1 Smart Growth Principles (continued)
Action Program
Responsible
Agency/
Department
Time Frame Implementation
Mechanism

3.1.5 Greenbelts: Preserve the
natural creeks and vegetation in
the City through a system of
greenbelts that connect
destination points and can be
used for recreation and nonmotorized circulation.

City of
Brentwood
Parks and
Recreation and
Community
Development
Departments
Ongoing ƒ General Plan
Bikeways and Trails
Map (13)
ƒ Parks, Trails and
Recreation Master
Plan (19)
ƒ Development Review
(9)

3.1.6 Balanced Development:

Strongly encourage residential
development in the city in a
balanced and efficient pattern
that reduces sprawl, preserves
open space and creates
convenient connections to other
land uses.

City of
Brentwood
Community
Development
and
Engineering
Departments
Ongoing ƒ Development
Regulations (Zoning)
(8)
ƒ Development Review
(9)
ƒ Design Guidelines (6)
ƒ Specific Plans (23)

3.1.7 Trails and Bikeways:

Develop and maintain a
continuous pedestrian,
equestrian and bicycle trails
network to facilitate recreation
and transportation that serves
neighborhoods, employment
centers, Downtown, schools and
other institutions and minimizes
conflict between pedestrians,
bicyclists, other non-motorized
users and automobiles.

City of
Brentwood,
LUHSD,
BUSD,
EBRPD and
ECCID
Adopt the
Parks, Trails
and Recreation
Master Plan
concurrently
with the
General Plan
Adoption
Ongoing
ƒ General Plan
Bikeways and Trails
Map (13)
ƒ Parks, Trails and
Recreation Master
Plan (19)
ƒ Development Review
(9)
ƒ Capital Improvements
Program (4)
ƒ Intergovernmental
Coordination (16)

3.1.8 Transit: Strongly
encourage the provision of
convenient, frequent,
dependable, efficient and
demand-responsive scheduled
transit for the City’s residents.

City of
Brentwood, Tri
Delta Transit
and BART
Ongoing ƒ Intergovernmental
Coordination (16)

3.1.9 Urban Limit Line
(ULL): Ensure that all new
development shall occur within
the City’s adopted ULL.

City of
Brentwood
Ongoing ƒ Development Review
(9)
ƒ Intergovernmental
Coordination (16)
Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 364 of 573 ends

21 SUMMARY OF IMPLEMENTATION MECHANISMS
The following summary of implementation measures relate to the last column of the previous table.

1. Annual Budget. The City prepares a budget for a two-year period with an annual review.

The budget provides a comprehensive financial framework for all City activities by specifying how City financial resources will be allocated to meet existing capital and services needs.

2. California Environmental Quality Act (CEQA) Review. This statute prescribes state mandated environmental review process for proposed development. This review process entails an evaluation of how a proposed project will impact the environment. Depending on the extent and magnitude of anticipated impacts, different kinds of environmental studies are prepared to analyze the impact of projects and inform the public and decision-makers about the significance a of development proposal’s impact on the environment. As part of the CEQA review, measures are developed to prevent or minimize adverse environmental impacts resulting from proposed projects. Examples of analyzed topics addressed through the CEQA review process include transportation, public services, and natural resources.

3. Capital Improvement Financing Program. The City prepares a Five-Year Capital Improvement Financing Program which is designed, in part, to ensure that traffic levels of service and other public infrastructure and service standards are met and/or maintained.

4. Capital Improvements Program. The Capital Improvement Program (CIP) is a compilation of the capital improvement planned for construction over the next five years. It includes cost estimates, the phasing of specific improvement and associated costs and methods with which specific improvement will be financed. The City conducts an annual review of the CIP and allocates money for transportation, infrastructure, and public facility improvements based upon available funding and existing priorities. The CIP also provides the basis for planning for funding of civic and community facilities.

5. City Procedures. The City can implement policies by making changes in its internal operating procedures. Examples include updating development application submittal requirements to better achieve the goals and policies set forth in the General Plan.

6. Design Guidelines. Design guidelines are a tool for ensuring that new development is compatible with the surrounding area and that it functions well for the community.

Guidelines convey community design expectations, help provide visual continuity, and ensure high design quality. To the extent possible, the guidelines shall be specific to Brentwood. Guidelines that are quantifiable shall be considered for incorporation into zoning regulations.

7. Development Fees. The City has adopted a development fee program to fund public facilities and infrastructure necessary to meet service standards and protect public health and safety.

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 365 of 573 ends

22 8. Development Regulations. The development regulations, primarily the zoning regulations and subdivision ordinance, provide the standards for development, prescribe allowable uses, contain specific incentive provisions, and include other standards and procedures related to requirements for approval of development projects.

9. Development Review. This is the process used by the City to assess conformance with development regulations, conduct CEQA review, and route development proposals through different City departments and affected public agencies for comments. The review process identifies the impacts of new development on the demand for services, public facilities, and infrastructure and includes the development of project-specific mitigation measures and other mechanisms to help finance needed improvement. Through this process the City assesses the public safety features of the design of proposed development projects. All projects, including public-sponsored projects are reviewed for consistency with the General Plan and other development regulations as early as possible in order to minimize wasted effort on projects deemed not to be in conformance.

10. Economic Development Strategy. The City of Brentwood’s Economic Development Strategy is a plan to attract and retain high quality industry and job generating uses in the City.

11. Fee Credits. The City uses fee credits to compensate developers who construct improvements beyond what is needed to serve their own development. Examples may include road development, extension of utilities, or construction of parks.

12. Fire Service Response Coverage Study. This is a study to determine the location and type of fire service delivery facilities needed to meet planned service objectives.

13. General Plan Bikeways and Trails Map. The General Plan Bikeways and Trails Map indicates the existing and future locations of bikeways and trails in the City of Brentwood.

The map illustrates plans for a complete linked trails system in Brentwood, with linkages to parks and schools. This system will help to create and maintain a walkable environment that is conducive to alternative modes of transportation.

14. General Plan Land Use Map. The General Plan Land Use Map indicates where future development and growth is going to occur as well as the density and intensity of this growth.

This is critical information in terms of planning for circulation systems within the City, since it is necessary to link future circulation needs with Brentwood’s projected future growth patterns.

15. Grant Programs. The city pursues available grant funding opportunities to supplement local revenue and assist with the completion of capital projects, programs or studies. Grant funds are available to cities from federal and state agencies as well as from non-profit organizations and private foundations.

16. Intergovernmental Coordination. The City shall coordinate with adjacent jurisdictions, Contra Costa County, Caltrans, Tri Delta Transit, and other agencies and organizations to Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 366 of 573 ends

23 ensure that development occurs in an orderly fashion and that public services and utilities keep pace with future growth and development in Brentwood.

17. Landscape and Lighting District. Landscape and Lighting Districts (LLDs) are a funding mechanism for ongoing maintenance of public amenities. The City uses this mechanism to pay the cost incurred by the City for landscape and street lighting maintenance.

18. Master Infrastructure Plan. The Master Infrastructure Plans identify existing needs and future facility requirements to accommodate growth and coordinate construction of necessary facility improvements.

19. Parks, Trails and Recreation Master Plan. The Parks, Trails and Recreation Master Plan sets a framework for future parks, trails and recreation facilities in the City of Brentwood based on the existing facilities and the projected future need. The Master Plan also helps to create integrated parks, trails, and recreation systems throughout the City.

20. Redevelopment Plan. The City has adopted a redevelopment plan to eliminate blight, upgrade public facilities and utilities, and assist low- and moderate-income households. The redevelopment plan enables the City to generate additional revenue to address existing capital facility and infrastructure needs.

21. Residential Growth Management Program. The Residential Growth Management Program (RGMP) provides for the orderly residential development of the City.

Implementation of this program will result in a better linkage between rates of growth and the provision of infrastructure and services.

22. Sewer Master Plan. Infrastructure master plans evaluate the capacity and limitations of existing facilities and identify new facilities necessary to meet future planned service needs.

The Sewer Master Plan evaluates the City’s existing sewer facilities and wastewater treatment needs. The plan identifies the projected service levels, describes required facility improvements, and discusses funding considerations based on the anticipated growth in the General Plan.

23. Specific Plans. Certain geographic areas need to be planned comprehensively, but in more detail than can be accomplished through the general plan. A specific plan provides an implementation tool that integrates land use, design, transportation, and utilities to produce a comprehensive strategy for development of a defined area.

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 367 of 573 ends

24 MONITORING AND COORDINATION
An important component in the success of Brentwood's Growth Management Program is to conduct regular evaluations of the effectiveness of the program. Information such as the amount of development that has occurred, the supply of vacant land, the status of current service levels, and programmed improvements to the infrastructure system will need to be reported to decision makers on a regular basis. Only in this way can Brentwood ensure that the goals and policies of the Growth Management Program are being met. Also key in the success of the program is coordinating with other agencies in the region, as many of the issues facing Brentwood are regional in nature.

Following are monitoring and coordination strategies to ensure the success of Growth Management Program.

1. The City shall conduct a regular review to determine the status of compliance with the adopted level of service and performance standards. A report shall be presented to the City Council as part of the capital improvement budget process identifying the current and projected levels of service, taking into account approved development and any mitigation measures required to offset project impacts. This report shall be utilized in the review of the City's five-year capital improvement program.

2. The City shall prepare a Five-Year Capital Improvement Program, which shall be designed, in part, to ensure that traffic levels of service and other public infrastructure and service standards are met and/or maintained.

3. The City shall coordinate developer financing with the City's Five-Year Capital Improvement Program to ensure adequate capacity for future growth. Developers shall be required to pay for their fair share of existing and future capacity to be used by their development.

4. The City shall cooperate with other jurisdictions in the County to reduce transportation congestion by participating in the Contra Costa Transportation Authority's Growth Management and Congestion Management Programs, by serving on the TRANSPLAN Committee, by encouraging public input into that process, by participating in the development of the Regional Route Action Plan, and by cooperating in planning for intersections subject to Findings of Special Circumstance.

5. The City shall work with surrounding jurisdictions as the need arises to resolve issues concerning establishing appropriate boundaries, the nature of development at boundaries, and other related regional issues.

6. The City shall regularly review its progress in attaining the desired jobs to housing ratio of 1.5 jobs per household.

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 368 of 573 ends

Attachment J - Voter-Approved ULL and Measure J Growth Management Element

Page 369 of 573 ends

Attachment K
Maintenance of Effort
City of Brentwood’s maintenance of effort requirement is $146,872 Expenditures in FY 2021/22: $1,002,017.50
Expenditures in FY 2022/23: $1,336,212.99

Page 370 of 573 ends

2999 Oak Road, Suite 100, Walnut Creek, CA 94597
ANNUAL REPORTING FORM
for MEASURE J LOCAL STREET MAINTENANCE AND IMPROVEMENTS (LSM) FUNDS (18% LSM FUNDS & 2.09% ADDITIONAL FUNDS)
FOR ELIGIBLE EXPENDITURES DURING FISCAL YEAR 2021‐22
Jurisdiction:   City of Brentwood
If you have any questions regarding this form, please contact Matt Kelly at CCTA, [email protected].

Please return the form to CCTA, along with the LSM Audit Reporting Form spreadsheet, Attn: Jackie Reyes (at address listed below or [email protected])

Total for FY 2021‐22
Starting Balance as of July 1, 2021 $2,002,376.93
18% + 2.09% Funds Received during FY 2021‐22 (actual, not accrued) $1,173,737.00 LSM Eligible Expenditures(Please describe all expenditures in excess of $10,000 on the LSM Audit Reporting spreadsheet)
Local Street and Roads  $1,002,017.50
Growth Management Planning and Compliance  $6,886.00
Transit Capital and Operations
Trails
Parking Facilities
Transportation Demand Management/Transportation Systems Management
Total LSM Expenditures during FY 2021‐22 $1,008,903.50
Funds Remaining  $2,167,210.43
Interest Earned  ($85,903.21)
Ending Balance as of June 30, 2022 $2,081,307.22
Form prepared by:     Corina Ramon  Phone:   925‐516‐5105 Email:     [email protected]
Title:       Accounting Technician
Date:       1/9/2023
Attachment L - 2021-22 City of Brentwood LSM Report - CCTA

Page 371 of 573 ends

Jurisdiction: <Enter Name Here>
Reporting Period: FY 2021‐2022
Project Type Project Name Project Description (Location, Limits) Measure J Funds
Expended ($) Reporting Metric (see instructions)
Local Streets and Roads
Asphalt Maintenance/Street Light Maintenance & Repairs/Sidewalk Repair Various Asphalt Maintenance/Street Light Maintenance & Repairs/Sidewalk Repair throughout the City.  Includes supplies and staff time.  $           1,000,000 Includes various streets throughtout 192 street miles within City limits, as well as various street lights amongst the 7,740 City street lights CCTA Measure J Local Streets & Roads Maintenance Audit Reporting Form (for expenditures of $10,000 or more) Attachment L - 2021-22 City of Brentwood LSM Report - CCTA

Page 372 of 573 ends

ANNUAL LSM SUMMARY REPORTING FORM

ANNUAL REPORTING FORM
for MEASURE J LOCAL STREET MAINTENANCE AND IMPROVEMENTS (LSM) FUNDS (18% LSM FUNDS & 2.09% ADDITIONAL FUNDS)
FOR ELIGIBLE EXPENDITURES DURING FISCAL YEAR 2022-23
Jurisdiction: ______________________________________
If you have any questions regarding this form, please contact Matt Kelly at CCTA, [email protected].

Please return the form to CCTA, along with the LSM Audit Reporting Form spreadsheet, Attn: Jackie Reyes (at address listed below or [email protected])

Total for FY 2022-23
Starting Balance as of July 1, 2022
18% + 2.09% Funds Received during FY 2022-23 (actual, not accrued) LSM Eligible Expenditures(Please describe all expenditures in excess of $10,000 on the LSM Audit Reporting spreadsheet)
Local Street and Roads
Growth Management Planning and Compliance
Transit Capital and Operations
Trails
Parking Facilities
Transportation Demand Management/Transportation Systems Management
Total LSM Expenditures during FY 2022-23
Funds Remaining
Interest Earned
Ending Balance as of June 30, 2023
Form prepared by: ______________________________ Phone: _______________________ Email: _______________________
Title: _________________________________________
Date: ________________
Attachment L - 2022-23 City of Brentwood LSM Report - CCTA City of Brentwood $2,081,307.22 $1,303,217.00 $1,327,206.99 $9,006.00 $1,336,212.99 $2,048,311.23 $17,730.02 $2,066,041.25 Corina Ramon 925-516-5105 Accounting Technician [email protected] 1/2/24

Page 373 of 573 ends

Jurisdiction: City of Brentwood
Reporting Period: FY 2022‐2023
Project Type Project Name Project Description (Location, Limits) Measure J Funds
Expended ($) Reporting Metric (see instructions)
Local Streets and Roads
Asphalt Maintenance/Street Light Maintenance &
Repairs/Sidewalk Repair
Various Asphalt Maintenance/Street Light Maintenance &Repairs/Sidewalk Repair throughout the City. Includessupplies and staff time. $ 1,300,000 Includes various streets throughtout 192 street
miles within City limits, as well as various street
lights amongst the 7,741 City street lights
Local Streets and Roads Brentwood Various Streets and Roads Preservation Pavement rehabilitation and preventative maintenance on arterial roadway segments in the City. Treatments includegrind and overlay, spot repairs, and slurry seals/crack seals,new traffic signal detection and striping. $ 25,557 Includes various streets throughtout 192 street
miles within City limits.

CCTA Measure J Local Streets & Roads Maintenance Audit Reporting Form (for expenditures of $10,000 or more) Attachment L - 2022-23 City of Brentwood LSM Report - CCTA

Page 374 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.1
11/12/2024
SUBJECT: Waive the first reading and introduce ordinances approving a Zoning Text Amendment (RZ 24-005) to the Brentwood Municipal Code to update regulations related to automobile service stations/gas stations, carwashes, and short-term rentals DEPARTMENT: Community Development Department
STAFF: Alexis Morris, Director of Community Development Erik Nolthenius, Planning Manager
Jennifer Hagen, Senior Planner

TITLE/RECOMMENDATION
Waive the first reading and introduce:

1. An ordinance approving amendments to the Brentwood Municipal Code to prohibit new automobile service stations/gas stations and carwashes and instead allow for the operation of Alternative Fuel Stations in all zones where currently allowed; add new land use classification in Section 17.030.030 (Definitions) for Alternative Fuel Station.

2. An ordinance approving an amendment to Brentwood Municipal Code Chapter

17.796 (Short-Term Rentals) to more clearly define and prohibit short-term rentals.

The proposed text amendments are exempt from the California Environmental Quality Act (CEQA), pursuant to Section 15061(b)(3) of the CEQA Guidelines, as it can be seen with certainty that the proposed ordinances would restrict future land uses and development and would not facilitate new construction or other groundbreaking activities. There is no potential to result in either a direct physical change to the environment or a reasonably foreseeable indirect physical change to the environment.

FISCAL IMPACT
Adoption of the ordinances will not result in a fiscal impact, as staff will continue to process appropriate planning applications through designated review processes, which include the collection of fees for the cost of these processes, in accordance with the City’s Cost Allocation Plan.

Page 375 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.1
11/12/2024

BACKGROUND
On January 24, 2023, the City Council provided direction to staff on reinitiating the City’s Zoning Code Update, including a focused and phased approach, rather than the comprehensive update that was initiated in the summer of 2020. On May 23, 2023, the project scope and budget were finalized when the City Council approved a Professional Services Agreement with De Novo Planning Group to prepare and complete the Focused Zoning Code Update and Objective Design Standards. The work plan approved by the City Council includes three main tasks to complete:

Task 1: Objective Design Standards;
Task 2: Zoning Code Updates required by State Law and the Housing Element; Task 3: Focused Zoning Code updates.

This agenda item is related to Task 3: Focused Zoning Code updates. This task includes amendments to various sections of the Zoning Code to better reflect the community's values based on feedback from the community and City Council, including changes to some permitted and conditionally permitted uses throughout the city.

On November 14, 2023, the City Council provided direction to staff on the following uses to be considered as part of the Focused Zoning Code Update efforts and also directed staff to present the Land Use and Development Committee (LUD) with an initial framework for each of the topics prior to moving forward with comprehensive and formal amendments:

1. Automobile service stations/gas stations

2. Carwashes

3. Alcohol sales

4. Self-storage facilities

5. Short-term rentals (STRs)

6. Drive-through uses
On June 17th and July 15th, LUD was presented with and provided direction on the six topics. Staff received clear recommendations from LUD on three of the topic areas, including automobile service stations/gas stations, carwashes, and short-term rentals (STR), which are now being presented to the City Council for adoption. Staff prepared individual reports for LUD on each of the topics and has included those three reports in Attachment 3 for the City Council’s reference.

Page 376 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.1
11/12/2024

PLANNING COMMISSION ACTION
The Planning Commission considered this item at a public hearing at its regular meeting of October 15, 2024, and was ultimately supportive of the requested text amendments. The Planning Commission expressed concerns related to enforcement of STRs, however, unanimously adopted Resolution No. 24-041, recommending that the City Council approve the amendments (RZ 24-005), prohibit new automobile service stations/gas stations and carwashes and instead allow for the operation of Alternative Fuel Stations in all zones where currently allowed; add new land use classifications in Section 17.030.030 (Definitions) for Alternative Fuel Station and; and update Chapter 17.796 (Short-Term Rentals) to more clearly define short-term rentals.

PROJECT DESCRIPTION AND ANALYSIS

AUTOMOBILE SERVICE STATIONS/GAS STATIONS AND CARWASHES
In considering zoning provisions for automobile service stations and carwashes, it is important to consider whether Brentwood is adequately served by the existing facility locations to meet the basic needs and expectations of residents and visitors. As the city is “built-out,” there will be fewer vacant sites available for overall development that is normally needed to meet other city needs and goals, such as attracting employment-generating businesses and improving the city’s jobs/housing balance.

Moreover, much of the remaining vacant land is surrounded by existing development that consists of residential neighborhoods, schools, and parks, and it is generally important to consider surrounding uses and context/compatibility when reviewing proposals for new automobile service stations.

There are currently 18 automobile service stations and 14 car washes (2 full service, 9 express, and 3 flex-service) operating in the city, as shown in the attached map (LUD Staff Report, Car Wash and Service Station Map – Attachment 4). Based on the existing facilities within the city, the limited available land, and in an effort to deemphasize fossil-fueled and auto-centric uses (such as gas stations and carwashes) and reduce greenhouse gas emissions and air pollution, LUD recommended that future fossil-fuel service stations and carwashes be prohibited throughout the city. In order to provide a clear distinction between fossil-fuel stations and alternative energy fueling stations, LUD also recommended changes to continue to allow for alternative fuel stations. Staff included the following proposed definitions in the draft Ordinance to address this:

Page 377 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.1
11/12/2024
“Alternative fuel station” means any establishment that dispenses alternative fuel as defined by the Energy Policy Act of 2005, including methanol, denatured ethanol, and other alcohols; mixtures containing 85% or more by volume of methanol, denatured ethanol, and other alcohols with gasoline or other fuels; natural gas; liquefied petroleum gas; hydrogen; coalderived liquid fuels; non-alcohol fuels (such as biodiesel) derived from biological material; and electricity.

Staff also proposes amendments throughout the BMC to remove all references to automobile service stations/gas stations and replace them with alternative fuel stations. Since the BMC § 17.450.004 (‘Conditionally permitted uses’) also tacitly allows uses not listed in PD Zones to be considered through the conditional use permit process, an amendment to this section is also required as follows:

17.450.004 Conditionally permitted uses.

Any use not listed as a permitted use or listed as conditionally permitted in the specific planned development zone may be permitted subject to approval of a conditional use permit pursuant to Chapter 17.830, except for gas station/service stations and carwashes.

It should be noted that the proposal that was presented to the Planning Commission also included a new definition for Electric Vehicle Charging station. After further review, it was determined that Electric Vehicle Charging Stations were already adequately addressed and regulated within Chapter 15.14 of the Municipal Code and therefore all references were removed from the final draft proposal.

Existing Uses
Chapter 17.610 of the BMC outlines regulations for Nonconforming Uses and Structures. The purpose of these provisions is to regulate uses of land and structures that were legal before the adoption of the BMC, but which no longer comply. While the current Nonconforming Uses section of the Code do not entirely address all potential changes to the City’s current land uses, amendments to this section are being drafted as part of the future Zoning Code Update that will clarify the intent to permit nonconforming uses to continue until they are removed, but not to encourage their survival or expansion. These changes will be brought back to the City Council at a later date. The Car Wash and Service Station Map included in Attachment 3 shows names and locations of existing carwash and service station uses in the City that would become legal non-conforming.

Page 378 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.1
11/12/2024

SHORT-TERM RENTALS
The rise in short-term rental (STR) activity over the last ten years have challenged many cities and municipal officials, as STRs often do not fit into normal municipal regulatory structures. Currently, the Brentwood Municipal Code (BMC) prohibits short-term rentals constructed, converted, or otherwise developed through the use of the two-unit housing development (SB 9) provisions set forth in BMC § 17.797 and/or through the use of the urban lot split (SB 9) provisions set forth in BMC §

16.169. In addition, the BMC allows rooming and boarding for at least 30 days at a time. Apart from SB 9 developments, STRs are not explicitly defined and prohibited, but to date, the City’s position is that the BMC requires that they qualify as rooming and boarding or else they are prohibited.

Based on the need to clearly define and prohibit future STRs, LUD recommended the following definition and changes be made to Chapter 17.796 (‘Short-Term Rentals’) to explicitly prohibit STRs of both residential units and outside amenities:

BMC § 17.796.003 Short-term rentals prohibited.

A. Definition. “Short-term rental unit” means the rental or occupancy of any residential dwelling unit or a portion thereof for a period of 30 consecutive calendar days or less. Short-term rental units include uninhabitable portions of the property such as swimming pools, courts, backyards, and other amenities available for rent for less than 30 consecutive calendar days.

B. Short-term rental units prohibited. It shall be unlawful for any person or entity to offer or make available to rent or to rent (by way of a rental agreement, lease, license, or any other means, whether written or oral), for compensation or any consideration, a short-term rental unit.

Staff has thus drafted amendments to the BMC that would prohibit all residential short-term rentals, including the rental of swimming pools, courts, and backyards, throughout the City.

CITY COUNCIL STRATEGIC INITIATIVE
Not applicable.

PREVIOUS ACTION
Previous action by the City Council is included on Attachment 1.

Page 379 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.1
11/12/2024

DATE OF NOTICE
The City of Brentwood published a public hearing notice in the Brentwood Press on November 1, 2024.

ENVIRONMENTAL DETERMINATION
The proposed text amendments are exempt from the California Environmental Quality Act (CEQA), pursuant to Section 15061(b)(3) of the CEQA Guidelines, as it can be seen with certainty that the proposed ordinances would restrict future land uses and development and would not facilitate new construction or other groundbreaking activities. There is no potential to result in either a direct physical change to the environment or a reasonably foreseeable indirect physical change to the environment.

ATTACHMENT(S)

1. Previous Actions

2. Draft Ordinance – Carwashes and Gas Stations

3. Draft Ordinance – Short-term Rentals

4. LUD Staff Reports on Automobile Service Stations/Gas Stations, Carwashes, and Short-Term Rentals

Page 380 of 573 ends

Attachment 1

PREVIOUS ACTIONS
Previous City Council actions related to this agenda item are listed below. To view prior actions and materials, and Brentwood Municipal Code references in the staff report, as applicable:
 Visit www.brentwoodca.gov/meetings, and select the meeting date(s) desired to see the reference materials and videos.
 Visit www.brentwoodca.gov/municipalcode to research references to the Brentwood Municipal Code and search by the code section(s) cited.

On November 16 and 17, 2017, the City Council held workshops to discuss, deliberate, and direct staff on priorities and the allocation of financial resources for the development of a Strategic Plan initiative. The City Council directed staff to initiate a comprehensive zoning ordinance update.

On February 27, 2018, the City Council adopted Resolution No. 2018-21 to approve the FY 2018/19 and FY 2019/20 City of Brentwood Strategic Plan, including Strategic Initiative 4.1.c, preparation of a comprehensive zoning ordinance update which has been continued over the past few years into the current Strategic Plan FY 2022/23 – FY 2023/24 (Focus Area 4: Land Use Planning, Goal 1: Implement Zoning Ordinance update).

On June 9, 2020, by Resolution No. 2020-73, the City Council adopted the City’s 2020/21 – 2024/25 Capital Improvement Program (“CIP”), which includes the Zoning Ordinance Update, CIP Project No. 337-37228.

On January 24, 2023, the City Council provided direction to staff on reinitiating the City’s Zoning Code Update, including a new focused and phased approach that is scaled down in size and focused into specific tasks.

On May 23, 2023, the City Council approved a Professional Services Agreement with De Novo Planning Group to prepare and complete the Focused Zoning Ordinance Update and Objective Design Standards.

On November 14, 2023, the City Council provided direction to staff on including updated regulations pertaining to automobile service stations/gas stations, carwashes, alcohol sales, self-storage facilities, short-term rentals, and drive-through uses as part of the Focused Zoning Code Update efforts and directed staff to present the Land Use and Development Committee (LUD) with an initial framework for each of the topics prior to moving forward with comprehensive and formal amendments.

Page 381 of 573 ends

ORDINANCE NO. ____

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF

BRENTWOOD APPROVING A ZONING TEXT AMENDMENT TO THE
BRENTWOOD MUNICIPAL CODE (RZ 24-005), WHICH WOULD

PROHIBIT NEW GASOLINE FUEL STATIONS AND NEW CAR

WASHES, AND EXPAND PERMISSION FOR ALTERNATIVE FUEL

STATIONS
WHEREAS, City staff prepared a zoning text amendment that would to prohibit new automobile service stations/gas stations and carwashes and instead allow the operation of Alternative Fuel Stations in all zones where automobile service stations/gas stations are currently allowed; and add new land use classification in Brentwood Municipal Code Section 17.030.030 (Definitions) for Alternative Fuel Station (the “Ordinance”); and
WHEREAS, the Ordinance would amend Title 17 (Zoning) of the Brentwood Municipal Code, and the Planning Commission is charged with reviewing amendments to said title prior to their consideration by the City Council; and WHEREAS, Brentwood has experienced rapid population growth over the past few decades, and in conjunction, the pace of development has been one of the highest in Contra Costa County; and
WHEREAS, Brentwood is transitioning from a city with vast areas of open land to one relying on infill development and redevelopment of existing areas and there are few vacant commercial sites to locate any new types of businesses, including gasoline fuel stations and car washes; and
WHEREAS, gasoline fuel stations and car washes may not be the highest and best use of the limited available commercial land, especially where such uses may be incompatible with nearby residentially zoned properties; and WHEREAS, expanding the availability of alternative fuel stations will allow the City of Brentwood to transition away from the use of pure fossil fuels as an energy source for vehicles to lower emission and zero emission alternatives, which will have positive impacts on community health, public safety, and the local and regional environment while aligning with State goals for sustainability; and WHEREAS, on October 4, 2024, the City gave public notice of a Planning Commission public hearing to be held to consider this Ordinance by advertisement in the Brentwood Press, a newspaper of general circulation; and WHEREAS, on October 15, 2024, the Planning Commission held a duly-noticed public hearing to consider the staff report, recommendation by staff, and public testimony concerning this Ordinance. Following the public hearing, the Planning

Page 382 of 573 ends

Attachment 2

Page 2 of 10 ends

Commission approved Resolution No. 24-041 and voted to recommend that the City Council adopt the proposed Ordinance by a vote of 5-0; and WHEREAS, the City published a notice of public hearing in the Brentwood Press on November 1, 2024, in accordance with City policies and Government Code Section 65090; and
WHEREAS, on November 12, 2024, the City Council held a duly-noticed public hearing to consider the Ordinance, including: (1) the public testimony and agenda reports prepared in connection with the Ordinance, (2) the policy considerations discussed therein, and (3) the consideration by the City’s Planning Commission; and WHEREAS, this amendment is exempt from the California Environmental Quality Act (“CEQA”) pursuant to Section 15061(b)(3) of the CEQA Guidelines, in that CEQA applies only to projects which have the potential for causing a significant effect on the environment, and it can be seen with certainty that there is no possibility that the Ordinance may have a significant effect on the environment; and WHEREAS, all legal prerequisites to the adoption of the Ordinance have occurred.

NOW, THEREFORE, the City Council of the City of Brentwood does ordain as follows:

SECTION 1. Recitals. The above recitals are incorporated into this Ordinance as though fully set forth herein.

SECTION 2. CEQA. Pursuant to California Environmental Quality Act (“CEQA”) Section 15061(b)(3) of the CEQA Guidelines, this project is exempt in that CEQA applies only to projects which have the potential for causing a significant effect on the environment, and it can be seen with certainty that there is no possibility that the Ordinance may have a significant effect on the environment, as the proposed Ordinance would restrict future land uses and development and would not facilitate new construction or other groundbreaking activities. There is no potential to result in either a direct physical change to the environment or a reasonably foreseeable indirect physical change to the environment.

SECTION 3. Rezoning. Brentwood Municipal Code Section 17.870.008 provides:

No rezoning of property or text amendment shall occur which is inconsistent with the city’s community development plan. In making a decision, the planning commission and council shall consider the consistency of the proposed action to the community development plan and other applicable city plans, and shall consider whether the proposed action is inappropriate or otherwise contrary to the public interest.

Page 383 of 573 ends

Attachment 2

Page 3 of 10 ends

The zoning text amendments set forth in Exhibit A are consistent with the General Plan because General Plan Land Use Policy LU 3-1 aims to ensure that an adequate inventory of vacant industrial, commercial, office, and business park land is designated, zoned, and maintained for targeted employment-generating uses. The Ordinance’s amendments prohibiting additional gasoline fuel stations and car washes will help to preserve remaining commercial land in the city for uses with greater employment generating potential. The City Council finds that the Ordinance is appropriate and is not contrary to the public interest in that it will help preserve commercial land for the highest and best use and protect the city’s residential neighborhoods.

SECTION 4. Amendment. Specified sections, or portions of sections, of Title 17 of the Brentwood Municipal Code are hereby amended to prohibit the development of new automobile service stations/gas stations and new car washes, as provided in Exhibit “A”, attached hereto and incorporated herein. Revisions to existing sections are reflected in strikethrough for deletions and underline for additions.

SECTION 5. Effective Date; Publication Date. This ordinance shall be published in accordance with Government Code Section 36933. This ordinance shall take effect 30 days after its adoption. The City Clerk is directed to cause the Municipal Code text to be entered in the Brentwood Municipal Code of the City of Brentwood to be modified accordingly.

THE FOREGOING ORDINANCE was introduced with the first reading waived at a regular meeting of the City Council of the City of Brentwood on the 12th day of November 2024 by the following vote:

AYES:

NOES:

ABSENT:

RECUSE:

APPROVED
Joel R. Bryant
Mayor
ATTEST:

Amanda McVey
City Clerk

Page 384 of 573 ends

Attachment 2

Page 4 of 10 ends

EXHIBIT “A”
SECTION 1. Brentwood Municipal Code Section 17.030.030 (‘Definitions’) is modified to add the following:
“Alternative fuel station” means any establishment that dispenses alternative fuel as defined by the Energy Policy Act of 2005, including methanol, denatured ethanol, and other alcohols; mixtures containing 85% or more by volume of methanol, denatured ethanol, and other alcohols with gasoline or other fuels; natural gas; liquefied petroleum gas; hydrogen; coal-derived liquid fuels; non-alcohol fuels (such as biodiesel) derived from biological material; and electricity.

SECTION 2. Subsection A of Brentwood Municipal Code Section 17.250.003 (‘Conditionally permitted uses’) is modified as follows:

The following uses are permitted only on the granting of a conditional use permit pursuant to Chapter 17.830:

A. Auto service station, nonmechanical carwash, Alternative fuel station, restaurant or café restricted to sit-down facility only, on-sale or off-sale liquor establishments;
SECTION 3. Subsection A of Brentwood Municipal Code Section 17.260.003 (‘Conditionally permitted uses’) is modified as follows:

The following uses are permitted only on the granting of a conditional use permit pursuant to Chapter 17.830:

A. Auto service station, Alternative fuel station, tire shop, repair shop, machine shop, auto seat and upholstery shop; billiard hall; bowling alleys; cardroom gaming; dancehall; laboratory—medical, dental, optical; meeting room— lodge, fraternal hall, community facility; medical or dental office; hospital; restaurant or café, on or off-sale liquor establishments; recreation services such as bowling alley, skating rink and similar uses;
SECTION 4. Subsection A of Brentwood Municipal Code Section 17.270.003 (‘Conditionally permitted uses’) is modified as follows:

The following uses are permitted only on the granting of a conditional use permit pursuant to Chapter 17.830:

A. Auto service station, Alternative fuel station, auto tire shop, auto repair including engine, transmission, brakes, etc., auto body repair and painting, carwash, laundry or dry cleaning plant, bakery—wholesale; all on-sale and offsale liquor facilities; billiard hall; card or gaming room, adult entertainment; dancehall; new and used equipment rental; meeting room—lodge, fraternal

Page 385 of 573 ends

Attachment 2

Page 5 of 10 ends

hall, community facility; hospital; truck and trailer rental, campground or recreation vehicle park, vocational or trade school;
SECTION 5. Brentwood Municipal Code Section 17.450.004 (‘Conditionally permitted uses’) is modified as follows:

Any use not listed as a permitted use or listed as conditionally permitted in the specific planned development zone may be permitted subject to approval of a conditional use permit pursuant to Chapter 17.830, except for gas station/service stations and carwashes.

SECTION 6. That portion of Brentwood Municipal Code Section 17.456.002 (‘Permitted uses and conditionally permitted uses’) shown below is modified as follows:
…
PD-6—PERMITTED USES AND CONDITIONALLY PERMITTED USES
Uses LDR MDR HDR
Park/O.S./
Public
Facility
Regional
Commercial
P.A. 1 Office
Commercial
P.A. 7 Office
Commercial
Accessory
Uses

P P P P P C C
Alternative
Fuel
Station
--- --- --- --- C1 P --- ---
Arcades,
Game
--- --- --- C C C C
Auto
Service
Station
--- --- --- --- ---C1 P --- ---
Bakeries --- --- --- --- P P C
Bar,
Tavern,
Cocktail
Lounge
--- --- --- --- P P ---
Barber and
Beauty
Salon
--- --- C --- P P P
Book
Stores
--- --- --- --- P P P
Camera
Stores
--- --- --- --- P P P

Page 386 of 573 ends

Attachment 2

Page 6 of 10 ends

PD-6—PERMITTED USES AND CONDITIONALLY PERMITTED USES
Uses LDR MDR HDR
Park/O.S./
Public
Facility
Regional
Commercial
P.A. 1 Office
Commercial
P.A. 7 Office
Commercial
Car Wash --- --- --- --- ---C ---C ---
Notes:
1 Stand-alone auto alternative fueling and auto service stations are conditionally permitted; auto alternative fueling stations that are accessory uses to an anchor retailer as the principal use are permitted.

SECTION 7. Subsection A(1) of Brentwood Municipal Code Section

17.462.003 (‘Conditionally permitted uses’) is modified as follows:

The following uses are conditionally permitted only on the granting of a conditional use permit pursuant to Chapter 17.830:

A. Subarea A. The following uses shall be conditionally permitted within this subarea:

1. Auto service station, Alternative fuel station, auto repair (tires, brakes, etc. but excluding auto body), car wash, auto rental and leasing agency, all on and off-sale liquor facilities, card and gaming room, dance hall, bowling alleys and similar commercial recreational uses, restaurants, new and used equipment rental, hospital, truck and trailer rental, vocational or trade school;
SECTION 8. Subsection C(5) of Brentwood Municipal Code Section

17.466.003 (‘Conditionally permitted uses’) is modified as follows:

Upon obtaining a conditional use permit pursuant to Chapter 17.830, the following uses are permitted in the PD-16 zone:
…
C. Subarea A. The following uses shall be conditionally permitted within this subarea:
…

5. Gas station Alternative fuel station /mini-mart, without service bays:
this use must integrate with other site circulation and design. Additional access points on Walnut Boulevard and Balfour Road are not allowed (see the development plan and related exhibits). Automotive, boat, recreational vehicle or similar sales and/or service are specifically prohibited;
SECTION 9. Subsections B(1) and B(2) of Brentwood Municipal Code Section

17.470.003 (‘Conditionally permitted uses’) are modified as follows:

Page 387 of 573 ends

Attachment 2

Page 7 of 10 ends

The following uses are permitted only on the granting of a conditional use permit pursuant to Chapter 17.830.
…
B. General Commercial.

1. Auto service station, Alternative fuel station, tire shop, repair shop, machine shop, auto seat and upholstery shop; billiard hall; bowling alleys; card room gaming; dance hall; laboratory-medical, dental, optical; meeting room-lodge fraternal hall, community facility; medical or dental office; hospital; restaurant or café, on or off-sale liquor establishments; recreation services such as bowling alley, skating rink and similar uses;

2. All drive-in, drive-thru establishments, building materials, garden supply, outdoor sales or display, automated car wash;
SECTION 10. Subsection B of Brentwood Municipal Code Section 17.484.003 (‘Conditionally permitted uses’) is modified as follows:

Upon obtaining a conditional use permit pursuant to Chapter 17.830, the following uses are permitted in the PD-34 zone:
…
B. Auto service station, Alternative fuel station, tire shop, auto seat and upholstery shops; laboratories for medical, dental, optical uses; meeting room/fraternal hall, neighborhood community center;
SECTION 11. Subsection C(2) of Brentwood Municipal Code Section

17.485.003 (‘Conditionally permitted uses’) is modified as follows:

The following uses are conditionally permitted in the PD-35 zone:
…
C. The following uses are conditionally permitted in subarea B:
…

2. Fuel sale facilities, Alternative fuel station, convenience stores, automated car washes, meeting rooms/fraternal halls, and neighborhood community centers;
SECTION 12. Subsection B of Brentwood Municipal Code Section 17.488.003 (‘Conditionally permitted uses in subarea A’) is modified as follows:

The following uses are permitted in subarea A of PD-38 subject to securing a conditional use permit pursuant to Chapter 17.830:

Page 388 of 573 ends

Attachment 2

Page 8 of 10 ends

…
B. Drive-in and drive-through establishments, including alternative fuel stations gas stations, but excluding all prohibited uses;
SECTION 13. Subsection G of Brentwood Municipal Code Section 17.488.013 (‘Conditionally permitted uses within subarea F’) is modified as follows:
…
G. Gas stations Alternative fuel stations;
SECTION 14. Subsection A(1) of Brentwood Municipal Code Section

17.488.016 (‘Prohibited uses’) is modified as follows:

A. The following uses shall be prohibited within subarea A:

1. Gas stations;
SECTION 15. Subsection C(4) of Brentwood Municipal Code Section

17.491.002 (‘Permitted uses’) is modified as follows:
…
C. Subarea C. The following uses shall be permitted within this subarea:
…

4. Car washes;
SECTION 16. Subsection A(2) of Brentwood Municipal Code Section

17.491.003 (‘Conditionally permitted uses’) is modified as follows:

A. Subarea A. The following uses shall be conditionally permitted within this subarea:
…

2. Auto service stations or gas stations; Alternative fuel stations; SECTION 17. Subsection C(5) of Brentwood Municipal Code Section

17.492.003 (‘Conditionally permitted uses’) is modified as follows:

Upon obtaining a conditional use permit pursuant to Chapter 17.830, the following uses are permitted in the PD-42 zone:
…
C. Subarea C. The following uses shall be conditionally permitted within this subarea:
…

5. Gasoline service stations and/or car washes; Alternative fuel stations;

Page 389 of 573 ends

Attachment 2

Page 9 of 10 ends

SECTION 18. Subsection C of Brentwood Municipal Code Section 17.499.002 (‘Permitted and conditionally permitted uses in subarea A’) is modified as follows:
…
The following uses are permitted within subarea A subject to approval of a conditional use permit:
…
C. Auto service station, car wash, Alternative fuel stations; tire shop, new or used car sales, vehicular repair;
SECTION 19. Subsection C of Brentwood Municipal Code Section 17.499.004 (‘Permitted and conditionally permitted uses in subarea C’) is hereby modified as follows:
…
The following uses are permitted within subarea C subject to approval of a conditional use permit:
…
C. Auto service station, car wash, Alternative fuel stations; tire shop, new or used car sales, vehicular repair;
SECTION 20. That portion of Brentwood Municipal Code Section 17.505.008 (‘Zoning matrix of land uses by subareas for PD-55’) shown below is modified as follows:
…
LAND USES3
Commercial Residential
Park and Water
Quality
Subarea
1 Subarea
2 Subarea
3 Subarea
6 Subarea
4 Subarea
5 Commercial Uses
… … …
Alternative fuel stations P P
Gas stations, with or
without car wash and/or
convenience store.

Limited to one such use
in one of the following
subareas: 1 or 2. Any
additional gas station
must apply for a
conditional use permit
P P

Page 390 of 573 ends

Attachment 2

Page 10 of 10 ends

SECTION 21. Subsection B(4) of Brentwood Municipal Code Section

17.517.003 (‘Permitted and conditionally permitted uses and general development standards for subarea B (general commercial area)’) is modified as follows:
…
B. Conditionally Permitted Uses for Subarea B.
…

4. Car washes, Tire shops, new or used car sales, and vehicular repair; SECTION 22. Subsections B(1) and B(5), respectively, of Brentwood Municipal Code Section 17.517.004 (‘Permitted and conditionally permitted uses and general development standards for subarea C (general commercial area)’) are modified as follows:
…
B. Conditionally Permitted Uses for Subarea C.

1. Gas stations; Alternative fuel stations;
…

5. Car washes, Tire shops, new or used car sales, and vehicular repair;

Page 391 of 573 ends

ORDINANCE NO. ____

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF

BRENTWOOD APPROVING A ZONING TEXT AMENDMENT TO
BRENTWOOD MUNICIPAL CODE CHAPTER 17.796 (RZ 24-005),
WHICH WOULD MORE CLEARLY DEFINE AND PROHIBIT SHORTTERM RENTALS WHEREAS, City staff prepared a zoning text amendment that would update Chapter 17.796 (Short-Term Rentals) to more clearly define and prohibit short-term rentals (the “Ordinance”); and
WHEREAS, the Ordinance would amend Title 17 (Zoning) of the Brentwood Municipal Code, and the Planning Commission is charged with reviewing amendments to said title prior to their consideration by the City Council; and WHEREAS, Brentwood has experienced rapid population growth over the past few decades, and in conjunction, the pace of development has been one of the highest in Contra Costa County; and
WHEREAS, short-term rentals have become increasingly popular over the past decade with the proliferation of platforms such as Airbnb and VRBO and with homeowners and renters seeking additional sources of income; and WHEREAS, short-term rentals can have negative impacts on the community, including decreasing the local housing supply and increasing rental prices by reducing the number of available units, creating noise and parking supply issues in neighborhoods, and harming the existing hospitality industry; and WHEREAS, on October 4, 2024, the City gave public notice of a Planning Commission public hearing to be held to consider this Ordinance by advertisement in the Brentwood Press, a newspaper of general circulation; and WHEREAS, on October 15, 2024, the Planning Commission held a duly-noticed public hearing to consider the staff report, recommendation by staff, and public testimony concerning this Ordinance. Following the public hearing, the Planning Commission approved Resolution No. 24-041 and voted to recommend that the City Council adopt the proposed Ordinance by a vote of 5-0; and WHEREAS, the City published a notice of public hearing in the Brentwood Press on November 1, 2024, in accordance with City policies and Government Code Section 65090; and
WHEREAS, on November 12, 2024, the City Council held a duly-noticed public hearing to consider the Ordinance, including: (1) the public testimony and agenda

Page 392 of 573 ends

Attachment 2

Page 2 of 4 ends

reports prepared in connection with the Ordinance, (2) the policy considerations discussed therein, and (3) the consideration by the City’s Planning Commission; and WHEREAS, this amendment is exempt from the California Environmental Quality Act (“CEQA”) pursuant to Section 15061(b)(3) of the CEQA Guidelines, in that CEQA applies only to projects which have the potential for causing a significant effect on the environment, and it can be seen with certainty that there is no possibility that the Ordinance may have a significant effect on the environment; and WHEREAS, all legal prerequisites to the adoption of the Ordinance have occurred.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BRENTWOOD DOES ORDAIN AS FOLLOWS:

SECTION 1. Recitals. The above recitals are incorporated into this Ordinance as though fully set forth herein.

SECTION 2. CEQA. Pursuant to California Environmental Quality Act (“CEQA”) Section 15061(b)(3) of the CEQA Guidelines, this project is exempt in that CEQA applies only to projects which have the potential for causing a significant effect on the environment, and it can be seen with certainty that there is no possibility that the Ordinance may have a significant effect on the environment.

SECTION 3. Rezoning. Brentwood Municipal Code Section 17.870.008 provides:

No rezoning of property or text amendment shall occur which is inconsistent with the city’s community development plan. In making a decision, the planning commission and council shall consider the consistency of the proposed action to the community development plan and other applicable city plans, and shall consider whether the proposed action is inappropriate or otherwise contrary to the public interest.

The zoning text amendments set forth in Exhibit A are consistent with the General Plan because General Plan Land Use Policy LU 2-2 is intended to ensure compatibility between land uses and to reduce any potential negative impacts associated with aesthetics, noise, and safety. The Ordinance’s amendments related to prohibition of short-term rentals will help to protect existing residential neighborhoods from negative impacts resulting from the commercialization of homes for short-term rental use. The City Council finds that the Ordinance is appropriate and is not contrary to the public interest in that it will help preserve commercial land for the highest and best use and protect the city’s residential neighborhoods.

SECTION 4. Amendment. Chapter 17.796 of Title 17 of the Brentwood Municipal Code is hereby amended to prohibit the operation of short-term rentals, as provided in Exhibit “A”, attached hereto and incorporated herein. Revisions to existing sections are reflected in strikethrough for deletions and underline for additions.

Page 393 of 573 ends

Attachment 2

Page 3 of 4 ends

SECTION 5. Effective Date; Publication Date. This ordinance shall be published in accordance with Government Code Section 36933. This ordinance shall take effect 30 days after its adoption. The City Clerk is directed to cause the Municipal Code text to be entered in the Brentwood Municipal Code of the City of Brentwood to be modified accordingly.

THE FOREGOING ORDINANCE was introduced with the first reading waived at a regular meeting of the City Council of the City of Brentwood on the 12th day of November 2024 by the following vote:

AYES:

NOES:

ABSENT:

RECUSE:

APPROVED
Joel R. Bryant
Mayor
ATTEST:

Amanda McVey
City Clerk

Page 394 of 573 ends

Attachment 2

Page 4 of 4 ends

EXHIBIT “A”

17.796.001 Title and purpose of provisions.

A. Title. The provisions of this chapter shall be known as the "short-term rental" provisions of this title.

B. Purpose. The purpose of these provisions is to regulate the short-term rental of certain all residential dwelling units, including those constructed, converted, or otherwise developed through the use of California Government Code Sections 65852.21 or 66411.7.

17.796.002 Applicability of provisions.

The provisions of this chapter apply to all dwelling units in the City, including those constructed, converted, or otherwise developed through the use of California Government Code Section 65852.21 or 66411.7, as set forth in the provisions of Chapters 16.169 and 17.797 of this code.

17.796.003 Short-term rentals prohibited.

A. Pursuant to California Government Code Section 65852.21(e), no residential dwelling unit constructed, converted, or otherwise developed through the use of the two-unit housing development provisions set forth in Chapter 17.797 of this code shall be rented, leased, or otherwise let for occupancy for a period of less than thirty calendar days.

B. Pursuant to California Government Code Section 66411.7(h), no residential dwelling unit constructed, converted, or otherwise developed through the use of the urban lot split provisions set forth in Chapter 16.169 of this code shall be rented, leased, or otherwise let for occupancy for a period of less than thirty calendar days.

A. Definition. “Short-term rental unit” means the rental or occupancy of any residential dwelling unit or a portion thereof for a period of 30 consecutive calendar days or less. Short-term rental units include uninhabitable portions of the property such as swimming pools, courts, backyards, and other amenities available for rent for less than 30 consecutive calendar days.

B. Short-term rental units prohibited. It shall be unlawful for any person or entity to offer or make available to rent or to rent (by way of a rental agreement, lease, license, or any other means, whether written or oral), for compensation or any consideration, a short-term rental unit.

Page 395 of 573 ends

DRAFT - Automobile Service Stations 1

FOCUSED ZONING CODE UPDATE

1. Automobile Service Stations
Background
A. Automobile Service Stations / Gasoline Service Stations: The gas station has been an iconic part of American car culture since the first one opened in Pittsburgh (a Gulf station) over one hundred years ago. And while gas stations can be considered essential businesses much like grocery stores and banks, they can have an impact on the urban landscape, particularly from an aesthetic and environmental/ecological perspective. In considering zoning provisions for automobile service stations, it is reasonable to ask if Brentwood is adequately served by the existing service station locations to meet the basic needs and expectations of residents and visitors. This is an important question because the city is becoming more “built-out” with less vacant land available for development that helps Brentwood meet other goals, such as attracting employment generating businesses, which would improve the city’s jobs/housing balance. Moreover, much of the remaining vacant land is surrounded by existing development that consists of residential neighborhoods, schools, and parks. It has become increasingly important to consider surrounding uses and context/compatibility when reviewing proposals for new automobile service stations.

Currently, there are no citywide regulations in the Brentwood Municipal Code (BMC) concerning development or performance standards for automobile service stations of any type. Thus, staff has limited tools available to effectively address the impacts caused by service station development and ensure that no adverse impacts occur from new service stations.

Further, the Environmental Protection Agency (EPA) has classified service stations and fuel storage locations as uses that may result in a brownfield site. Brownfield sites are properties, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous substance, pollutant, or contaminant. Common contaminants found at service station sites include gasoline, diesel, petroleum oil, volatile organic compounds and solvents, polycyclic aromatic hydrocarbons, and lead. Exposure to the types of contaminants present, or potentially present, at service stations can threaten the public health, safety, or welfare of the community.

With regard to fiscal considerations, automobile service stations do generate significant tax revenue, primarily from the sale of gasoline. However, it is anticipated that tax revenue will decline over time in part due to the availability and preference of alternative energy sources for powering automobiles. For example, electric cars powered by batteries are becoming more commonplace. In 2020 Governor Newsom signed Executive Order N-79-20 to phase out gasPage 396 of 573 DRAFT - Automobile Service Stations 2
powered passenger vehicles by 2035 and medium to heavy-duty vehicles by 2045.

This was then followed up in 2021 by Assembly Bill 1279 The California Climate Crisis Act that codified the policies to achieve carbon neutrality no later than 2045.

It is estimated that by 2030, more than one third of all new vehicles sold will be fully or partially electric powered. As battery charging can occur at home, work, or in parking lots, the need for service stations is likely to decline in a corresponding manner. The declining demand for gasoline due to changes in technology and consumer preferences may increase competition among the existing service stations in the city such that closures may occur over time.

The analysis of issues related to automobile service stations makes clear that the City should evaluate new regulations to address the potential impacts associated with this land use. Regulations could range from additional standards in the BMC to limitations on future service station locations. As Brentwood transitions to infill development and redevelopment of existing areas, there is less available open commercial land to locate new service station facilities. Automobile service stations may not be the best use of available commercial land, and on those sites that are near residentially zoned properties, they may not be compatible.

Analysis
A. General: There are currently 18 automobile stations operating in the city, as outlined in the following table and attached map (Car Wash and Service Station Map – Attachment 1a):

Name Address Carwash?
1 Chevron 330 Oak Street No
2 Quik Stop 3940 Walnut Blvd No
3 Arco 2250 Balfour Road Yes
4 Chevron 190 Griffith Lane Yes
5 Chevron 6700 Brentwood Blvd Yes
6 National Petroleum 8401 Lone Tree Way No
7 Power Market 8750 Brentwood Blvd No
8 AMPM 6481 Lone Tree Way Yes
9 Chevron 2371 Balfour Road Yes
10 Chevron 6935 Lone Tree Way No
11 Shell 6031 Lone Tree Way Yes
12 Rotten Robbie 6860 Lone Tree Way Yes

Page 397 of 573 ends

DRAFT - Automobile Service Stations 3
Name Address Carwash?
13 ARCO 6970 Brentwood Blvd No
14 Chevron 5591 Lone Tree Way Yes
15 Brentwood
Petroleum
7920 Brentwood Blvd No
16 7-Eleven 5931 Lone Tree Way No
17 7-Eleven 7460 Brentwood Blvd No
18 Mobil 6750 Brentwood Blvd Yes
As shown on the attached map, gas stations throughout the city are located on the periphery, with the majority of stations located on Balfour Road, Brentwood Boulevard, and Lone Tree Way. There are no gas stations located within the interior of the city or along main thoroughfares such as Sand Creek Road and Fairview Avenue.

B. Existing Regulations: Automobile service stations can only be approved in Brentwood with a conditional use permit (CUP), which provides the City with discretionary review ability. This allows staff and the Planning Commission to consider each service station application on a case-by-case basis and to apply specific conditions to a project to ensure land use compatibility with the surrounding area. It is recommended that the City maintain this requirement for a CUP for automobile service station facilities.

C. Locations: Automobile service stations are conditionally permitted in three commercial zoning districts and in certain Planned Development (PD) Zones. In PD-6; however, stand-alone auto fueling and automobile service stations are conditionally permitted while auto fueling stations that are accessory uses to an anchor retailer as the principal use are permitted by right. Brief descriptions of the intended land uses for these zoning districts are below:

C-1
Neighborhood Commercial. Intended to provide neighborhood convenience centers, which are typically a 5-10 acre shopping center with a supermarket as the prime tenant. The neighborhood convenience center generally is intended to serve the day-to-day needs of the surrounding neighbors within a one-mile radius.

C-2
General Commercial. Intended to serve the general shopping needs of the Brentwood community as well as other nearby communities. This zoning district allows retail stores and service uses to serve the general needs of the community.

Page 398 of 573 ends

DRAFT - Automobile Service Stations 4
C-3
Thoroughfare Commercial. Commercial zone for retail and service businesses that are typically related to highways and major thoroughfares. Such uses generally do not lend themselves to be located in general commercial or neighborhood convenience centers, but are encouraged in orderly clusters in suitable locations adjacent to highways and major thoroughfares where special consideration is given to on-site and off-site traffic and circulation, impact on adjacent land uses, etc.

PD
Planned Development.
• PD-6
• PD-12
• PD-16 – Subarea A
• PD-20
• PD-34
• PD-35 – Subarea B
• PD-38 – Subarea A
• PD-41
• PD-42 – Subarea C
• PD-49 – Subareas A and C
• PD-55 – Subareas 1 and 2
• PD-67 – Subarea C
In evaluating the suitability of the zoning districts in which automobile service stations are permitted, General Commercial (C-2) and Thoroughfare Commercial (C-3) are both intended to serve a broad market, typically along major transportation corridors. These zones can be considered a logical fit for an automobile service station use. The Neighborhood Commercial (C-1) zoning district; however, is intended for smaller scale, less intensive uses that serve the needs of the immediate neighborhood. Given that development pressure will continue throughout the city for land that will become increasingly scarce, preserving the Neighborhood Commercial zone for higher and better uses may be an economically strategic option. Furthermore, removing service stations as a conditionally permitted use in the Neighborhood Commercial zone will minimize, if not eliminate, any potential conflict between service station operations and sensitive residential receptors. It should be noted that if the BMC were amended to prohibit service stations in the C-1 zone, any existing automobile service stations in the C-1 zone would be allowed to continue operating as legal, nonconforming uses1.

D. Potential Development and Design Standards: The application of development and operational standards for automobile service stations will ensure the consistency

1 § 17.610.004 of the BMC states that no nonconforming use shall be expanded, extended, enlarged, substituted, replaced or otherwise altered without conforming to the provisions of this chapter.

Page 399 of 573 ends

DRAFT - Automobile Service Stations 5
of regulations for new service stations and for the expansion of existing service stations. Of principal concern is the impact of service stations on residential uses and on certain public uses such as schools and parks. The development standards identified below could mitigate against the negative impacts that could result from new and remodeled automobile service station sites.
• Location and separation. An automobile service station shall be at least three hundred feet from any school, park, or similar use, and shall be at least five hundred feet from any other service station on the same side of a street, except at an intersection of two streets where a maximum of two stations may be permitted on the corners of such intersection.
• Lot size. An automobile service station site shall be at least one hundred fifty feet by one hundred fifty feet or the minimum required for the zone in which it is located, whichever is greater. A service station may be modified or rebuilt on an existing service station parcel with site dimensions less than required in this section, provided that all other development standards for the service station are satisfied.
• Setbacks. Notwithstanding the applicable setback regulations for the underlying zone, canopies over pump islands, whether attached to a building or not, may extend to within ten feet of street property lines. • Parking requirements. An automobile service station and any ancillary uses shall comply with all applicable standards of Chapter 17.620 (Off-Street Parking). Where conflict arises between sections, the requirements of this subsection shall take precedence.
o Automobile service station: Two spaces minimum. Spaces at the pump islands do not satisfy this parking standard. Any additional ancillary uses on the property shall also include the parking requirements listed below. o Automobile service station with a convenience store: Five spaces per 1,000 square feet of gross floor area of the convenience store. Up to 50 percent of the pump islands may be counted as parking spaces. o Automobile service station with car wash: The parking requirement shall be determined by a parking demand study prepared by an independent traffic engineer licensed by the State of California. The study shall be provided by the applicant, at their sole expense.
o Automobile service station with vehicle service bay: One space per service bay.
o A minimum of one loading space and delivery vehicle stacking area shall be located and designed to avoid undue interference with the public use of streets and alleys, drive aisles, or automobile parking spaces.

Page 400 of 573 ends

DRAFT - Automobile Service Stations 6
• Driveways. No more than two driveways or means of access shall be provided to any one street. Driveways shall be located as follows:
o Not less than twenty-five feet from the nearest street intersection; o Not less than twenty-five feet from any other driveway; o Not less than five feet from a side property line.
• Ancillary equipment/devices. Ancillary equipment/devices such as air compressors shall not be located in any required building setback area. • Alternative fuel stations. In addition to the minimum electric vehicle (EV) charging stations required by the California Building Code (CBC), a minimum of one alternative fuel station shall be provided for every four petroleum-based fuel pumps. The alternative fuel station can be an additional EV charging station, compressed natural gas (CNG), hydrogen, or other alternative fuel. • Restrooms. Public restrooms shall be provided on site, at no charge, for customer use during normal business hours. The restroom shall be continuously maintained in a clean and sanitary manner. Entrances to restroom facilities shall be located within a building.
• Design. All service station developments shall be subject to the City of Brentwood Commercial and Industrial Design Guidelines. The service station structure must be architecturally compatible with any other buildings on site and with the surrounding neighborhood.
• Landscaping. In addition to all landscaping standards outlined in Chapter

17.630 (Landscaping and Screening), a landscaped buffer strip five feet wide shall be provided along all interior lot lines except where such area is occupied by buildings or driveways.
• Signs. Signs for an automobile service station and any ancillary uses shall comply with all applicable standards of Chapter 17.640 (Sign Ordinance).

E. Potential Operational Requirements:
• Location of activities. All activities shall be conducted within buildings except dispensing of fuel products from pump islands, vehicle charging, and air and water services, and minor emergency repairs including replacement of headlights, turn indicator bulbs, or windshield wipers. • Hours of Operation. Hours of operation shall be determined through the CUP process based on nearby uses and shall not operate 24 hours a day if directly adjacent to residential development.
• Site maintenance. The site including all structures, landscaping, walls/fences, and signs shall be maintained in good repair, in a clean, neat, and orderly condition. Driveways, parking, landscape, and service areas shall

Page 401 of 573 ends

DRAFT - Automobile Service Stations 7
be maintained and kept free of grease, oil, and other petroleum products in addition to litter. These areas shall be periodically cleaned with equipment that dissolves spilled grease, oil, and other petroleum products without washing them into drainage, gutter, or sewer systems.
• Trash receptacles. Trash receptacles shall be located at the building entrance and at each pump island. The premises shall be kept free of the accumulation of litter or waste. Removal of waste or litter from the trash receptacles shall occur at a minimum of once each day the business is open. • Trash enclosure. A trash enclosure, completely enclosed with a decorative masonry wall not less than six feet high with a solid metal, self-enclosing gated opening, and large enough to accommodate standard-sized commercial trash bins, shall be located on the rear portion of the property in a manner which is accessible to refuse collection vehicles.
• Ancillary uses. Ancillary uses related to automobile service stations shall comply with the following:
o Convenience store.
 Outdoor display of merchandise shall be prohibited unless a temporary use permit is obtained pursuant to Chapter 17.850 (Temporary Use Permits).
o Car wash.
 Shall comply with all applicable standards as determined through the Focused Zoning Code Update which may include additional separation requirements and operational restrictions.
 Applicants shall provide a noise study prepared by an independent acoustical engineer licensed by the State of California. The study shall be provided by the applicant, at their sole expense.
o Vehicle repair shop.
 Shall not operate 24 hours a day and shall be determined through the CUP process based on nearby uses.
 Openings of service bays shall be designed to minimize the visual intrusion onto adjoining public rights-of-way and properties.  Service bay doors shall not directly face an existing residential development or residential zone.
 Vehicle repair shops shall be limited to battery and ignition services, tire repair and sales, and other accessory sales and services for automobiles, but shall exclude major automobile

Page 402 of 573 ends

DRAFT - Automobile Service Stations 8
repairs, tire recapping, steam cleaning, painting, body and fender work, engine overhaul, and other work of a similar nature. • Hazardous materials. All necessary permits for the storage and use of hazardous materials shall be obtained. All automobile fluids shall be recycled or removed according to applicable state and federal standards.

F. Potential Full or Partial Moratorium: In an effort to reduce greenhouse gas emissions and air pollution, a number bay area cities have adopted ordinances to prohibit any new fossil-fuel pumps throughout their cities. The movement to prohibit new gas stations began in 2021 when the City of Petaluma became the first city in the U.S. to prohibit new gas stations. After Petaluma’s ordinance was passed additional cities in Sonoma County and all cities in Napa County joined suit. As Brentwood transitions to infill development and redevelopment of existing areas, there is less available open commercial land to locate new service station facilities. Automobile service stations may not be the best use of available commercial land, and therefore a complete ban on future development may be considered.

As shown on the attached map, gas stations throughout the city are located on the periphery, with the majority of stations located on Balfour Road, Brentwood Boulevard, and Lone Tree Way. There are no gas stations located within the interior of the city or along main thoroughfares such as Sand Creek Road and Fairview Avenue. Therefore, based on the concentration map included in Attachment 1a, future stations in these areas such as along the Sand Creek Road extension west of Highway 4 on commercially designated parcels, would not cause or contribute to overconcentration and may be appropriate. Thus, the City may want to consider continuing to allow gas stations only in these zones/areas and ban future development in all other areas.

Page 403 of 573 ends

FawnHill Way
Europena Dr
Groves Dr
Ventura Dr
HarvestPark Dr
McFarlan Ranch Dr
Summerwood Dr
Randy Way
Deerspring Way
CrispinDr
Fremont Peak Dr
Solera St
California Trl
Coral Bel
l Wa
y
Breakwater Way
St Augustine Dr
Gamay Way
Palomino
Way
Brown Rd
Eagle Rock Ave
Douglas Rd
Marina Way Winesap Dr
Elkins Way
Milford St
Atherton Blvd
Frank lin Dr
Hill Ave
Prewett Ranch Dr
Jubilee Dr
Lavender Way
Pomona Dr
Catanzaro Way
Meadow Brook Dr
Latour Ave
Dynas
ty
Dr
HudsonDr
WatervilleDr
Upton
Pyne Dr
Big Basin Dr
Neroly Pvt Rd
Castellina Dr
Torrey Pines Dr
Rou
n
dhill Dr
Kent Dr
Braemar St
Stew
a
r
W
t
ay
Summerfield
Dr
Mills Dr
O'Hara Ave
Corte Vista St
Anastasia Dr
Su
m
merse
t Dr
Armstrong Rd
Simoni Ranch Rd
S
l
a
t
te
n
Ranch
Rd
Arlington Way
Reserve
Dr
M wo i k Av
e
Daffodil Dr
Claremont D
r
P
utter Dr
1st St
Stonewood
Dr
Redhaven St
Vintage Cir
Trl
St Regis Ave
Spanish Bay
Dr
E Country Club
Dr
Highland Way
Dainty Ave
Main St
Vintage Dr
Centenni al Dr
2nd St
Marjoram Dr
John Muir
Pkwy
Diablo Way
Peb
ble
B
each Dr
Apricot Way
Mountain Vie w Dr
American Ave
Valley Green Dr
Laurel Rd
Regent D r
Spruce St
McClarren Rd
Walnut Blvd
Crescent Dr
Baldwin Dr
Rut h e
rford
C ri
Sycamore Ave
Malicoat Ave
Central Blvd
Palmilli
a
D
r
Spyglass Dr
CanadaVall
ey Rd
Continente Ave
Sunset Rd
Presidio Dr
Walnut Ave
Oak St
Lakeview Dr Heidorn Ranch Rd
Brownstone Rd
W Cou
ntryClub Dr
Ohara Ave
Grant St
Creek
Rd
Delta Rd
Fai
rview
Ave
OldSand Creek Rd
Sand Creek Rd
Chestnut St
Foothill
D
r
Carpenter Rd
Marsh Creek Rd
Neroly Rd Apple Hill Dr
Empire Rd
Garin Pkwy
Vist
a
G
ra
ndeDr
Vineyard Pkwy
E
m
pire Av
e
Balfour Rd
Hillcrest Ave
Vasco Rd
San Jose Ave
Ma
rs h Creek
Trl
S
a
int Andrews Dr
Eureka Ave
Minnesota Ave
Payne Ave
State
R
t
e
4 M
ars
h
Creek
Region
a
l
T
r
l
Briones Valley
Rd
Concord Ave
Lone Tree Way
Brentwood Blvd
Sellers Ave
Brentwood
Hand Car Wash
(Duckys)
SaversCarwash
Quick Quack
Car Wash
Zip Thru
Chevron
Arco
Brentwood
Auto Spa
Chevron
AMPM
Shell
Chevron
Chevron
Chevron
Arco Chevron
Quik Stop
Chevron
Power Market
National Petroleum
AMPM
Chevron
ARCO
Rotten Robbie
Chevron
Shell
Brentwood Petroleum
7-Eleven
Chevron
7-Eleven
Mobil
0 1,000 2,000
US Feet
±
LEGEND
Gas Station Locations
Carwash Locations
Brentwood City Limits
Source: City of Brentwood. Map date: April 30, 2024.

CITY OF BRENTWOOD
Gas Stations and Carwashes
Attachment 1a

Page 404 of 573 ends

C-2
PD-63
R-3
PF
PD-41
PD-38
C-3
PD-65 PD-59
PD-29
R-1-8
PD-35
R-1-10
PD-36
PD-26
PD-4
PD-62
CO
PD-2
PD-25
R-1-10
R-2
PD-5
PD-8
PD-43
PF
R-3
PD-17
PD-24
PD-12
PD-13
PD-16
PD-47
PD-69 C-1
R-1-8 PD-7
PD-34
R-1-E
PF
PD-49
PD-21
R-1
PD-14
PD-3
PD-33
PD-31
CO
PD-20
PD-64
PD-18
PD-67
PD-22
R-1-E
PD-9
PF
PD-1
PD-15
PD-44
R-1-6
PD-11 PD-61
PD-30
PD-45
PD-50
PF
PD-56
PD-28
PD-71
PD-40
PD-55
PD-58
R-1
BBSP
PD-42
C-2
RE
PD-23
PD-46
PD-60
PD-37 PD-39
R-2
R-1-10
PD-66 R-1-E
PD-10
PD-27
PD-19
PD-54
PD-68
R1-12
R-1-12
PD-72
DT
PF
PD-6
PA-1
PD-53
R-2
Shady Oak Dr
Sterling Hill Dr
Prewett Ranch Rd
Fawn HillWay
Europena Dr
Groves Dr
Ventura Dr
R idge
v
ei
w Dr
Harvest Park Dr
McFarlanRanch Dr
Summerwood Dr
Prominent Dr
Randy Way
Deerspring Way
CrispinDr
Fremont Peak Dr
Solera St
Double K R
d
California Trl
Coral
B
ell W
a
y
Breakwater Way
St Augustine Dr
Gamay Way
Palomin
o
Way
Brown Rd
Eagle Rock Ave
Douglas Rd
Marina Way Winesap Dr
Elkins Way
Milford St
Atherton Blvd
F
ran
klin
Dr
Hill Ave
Prewett Ranch Dr
Jubilee Dr
Pomona
Dr
Catanzaro Way
Meadow Brook Dr
Latour Ave
Dyn
asty Dr
Hudson
D
r
Wa
tervilleDr
Upton Pyne
Dr
Big Basin Dr
Neroly Pvt Rd
Castellina Dr
Torrey Pines Dr
Ro
u
ndhill
D
r
Kent Dr
Braemar St
Stew
art
Way
SummerfieldDr
Mills Dr
O'Hara Ave
Corte Vista
S
t
Anastasia Dr
S
u
mme
rset D
r
Armstrong Rd
Simoni Ranch Rd
Slatten
Ranch Rd
Arlington Way
Reserve Dr
Miwok Ave
Daffodil Dr
Claremont Dr
Putter Dr
1st St
StonewoodDr
Redhaven St
Vintage Cir
Trl
St Regis Ave
Spanish Bay Dr
E Country Clu
b
Dr
Highland Way
Dainty Ave
Main St
Vintage Dr
Centennial Dr
2nd St
Marjoram Dr
John
Mui
r
Pkwy
Diablo Way
P
e
bble
B
e
ach Dr
Apricot Way
Mo
untain
View Dr
American Ave
Valley Green Dr
Laurel Rd
Regent Dr
Spruce St
McClarren Rd
Walnut Blvd
Crescent Dr
Baldwin Dr
Rut
h
e
rford
C ir
Country
Hills
D
r
Sycamore Ave
Malicoat Ave
Central Blvd
Palmillia Dr
Spyglass Dr
Canada Valley Rd
Continente Ave
Sunset Rd
Presidio Dr
Walnut Ave
Oak St
Lakeview Dr
Heidorn Ranch Rd
Brownstone Rd
WCountry Club Dr
Ohara Ave
Grant St
Cre
e
k
Rd
Delta Rd
Fairview Ave
Old Sand Creek Rd
Sand Creek Rd
Chestnut St
Foothill
Dr
Carpenter Rd
Marsh Creek Rd
Neroly Rd Apple Hill D
r
Empire Rd
Garin Pkwy
Vista Gra
n
d
e D
r
Vineyard Pkwy
E
m
pir
e
Av
e
Balfour Rd
Hillcrest Ave
Vasco Rd
San Jose Ave
Mars
h
Creek Trl
Saint Andrews Dr
Eureka Ave
Minnesota Ave
Payne Ave
State R
t
e
4 Marsh
Cre
e
k
Reg ona i l Trl
Briones Valley Rd
Concord Ave
Lone Tree Way
Brentwood Blvd
Sellers Ave
SaversCarwash
Quick Quack
Car Wash
Zip Thru
Chevron
Arco
Brentwood Auto Spa
Chevron
AMPM
Shell
Chevron
Chevron
Chevron
Arco Chevron
Quik Stop
Chevron
Power Market
AMPM National Petroleum
Chevron
ARCO
Rotten Robbie
Chevron
Shell
Brentwood Petroleum
7-Eleven
Chevron
7-Eleven
Mobil
0 1,000 2,000
US Feet
±
Source: City of Brentwood. Map date: April 30, 2024.

CITY OF BRENTWOOD
Gas Stations and Carwashes
LEGEND
Gas Station Locations
Carwash Locations
Brentwood City Limits
City of Brentwood Zoning
BBSP
C
CO
DT
PD
PF
R
R1
RE
Attachment 1a

Page 405 of 573 ends

DRAFT - Car Washes 1

FOCUSED ZONING CODE UPDATE

2. CAR WASHES
Background
A. Car Washes: Car washes have steadily developed to incorporate automation and water-saving technologies. There are three primary types of car washes today:
full service, express service, and flex-service.

Full service car washes are typically stand-alone facilities that employ a relatively large number of people either to wash, hand wash, or detail vehicles. These types of car washes are typically the only use on a property. Express car washes are usually associated with gas stations and are more commonly called drive-thru car washes. These facilities are a secondary, accessory use relative to the gas station, convenience store, or combination thereof. They are fully automated and require little to no staff. Older, unattended self-service car washes where customers wash, dry, and vacuum their own vehicles also fall within the express car wash category as these types of facilities are typically unattended.

Flex-service car washes (a hybrid of the full service and express service car wash models) combine the full service and express car wash models to offer both services in one location. The car wash industry is trending toward greater flexibility and reducing labor costs by transitioning from a full service model to a flex-service model, often with a flat monthly fee for unlimited washes. The foundation of this style is a conveyorized tunnel with an entry payment system.

Customers select a base wash package at the automated computer attendant and then add optional aftercare services such as interior vacuum, waxing, and/or a tire shine. All wash customers stay in the vehicle through the wash. Customers who purchase aftercare services follow directional signage to an aftercare center where they turn over their car to an attendant and wait in a lobby while their vehicle is prepared. Customers who do not elect any of the optional services may still utilize vacuums at vended stations which may contain between 10 to 40 vacuums. Flex-service car washes usually employ less staff than full service car washes.

There are currently no citywide regulations in effect regarding the operational and locational standards for car wash facilities of any type.

Analysis
A. General – Car Washes: There are currently 14 (2 full service, 9 express, and 3 flex-service) car washes operating in the city, as outlined in the following table and attached map (Car Wash and Service Station Map – Attachment 1a):

Page 406 of 573 ends

DRAFT - Car Washes 2
Type Name Address
1 Full Service Brentwood Auto Spa 6945 Lone Tree Way
2 Full Service Brentwood Hand Car Wash (Ducky’s) 4950 Balfour Road 3 Flex-Serve Quick Quack Car Wash 7450 Brentwood Blvd
4 Flex-Serve Savers Carwash 6750 Brentwood Blvd
5 Flex-Serve Super Clean Carwash 6970 Brentwood
6 Express Zip Thru 2650 Empire Ave
7 Express Chevron 2371 Balfour Road
8 Express Arco 2250 Balfour Road
9 Express Chevron 190 Griffith Lane
10 Express AM/PM 6481 Lone Tree Way
11 Express Shell 6031 Lone Tree Way
12 Express Rotten Robbie 6860 Lone Tree Way
13 Express Chevron 5591 Lone Tree Way
14 Express Chevron 6700 Brentwood Blvd
Car washes remain popular among drivers as the convenience and relative low cost of getting a car wash continues to attract customers. Additionally, there are environmental benefits to modern car washes as they utilize water recycling systems that consume less water than washing a car at home on a driveway.

Trends in car wash development suggest a movement from full service car washes to express and flex-service car wash models.

Car washes are often loud because, in addition to other equipment that generates noise during their operation, they require the use of large-scale, industrial vacuuming systems. These impacts can be particularly acute when car washes are located near residential uses and when multiple car washes are concentrated in a small area. Car washes surrounded by residential uses may have the potential to expose neighboring residents to excessive noise. As car washes move from full service to express and flex-service models, there is also concern that fewer onsite employees may result in less oversight, and therefore less control of impacts that these facilities may have on adjacent properties.

B. Existing Regulations: The Brentwood Municipal Code does not have citywide development standards to mitigate impacts caused by car washes. Currently, car washes are a conditionally permitted use in the Neighborhood Commercial (C-1) and Thoroughfare Commercial (C-3) Zones. Car washes are also permitted or

Page 407 of 573 ends

DRAFT - Car Washes 3
conditionally permitted in certain Planned Development (PD) Zones. Aside from the PD Zones, car washes can only be approved in Brentwood following the approval of a conditional use permit (CUP), which provides the City with discretionary review ability. This allows staff and the Planning Commission to consider each car wash application on a case-by-case basis and to apply specific conditions to a project to ensure land use compatibility with the surrounding area.

It is recommended that the City maintain this requirement for a CUP for car wash facilities.

C. Locations: As noted above, car washes are allowed in two commercial zoning districts and in certain Planned Development Zones. A brief description of the intended land uses for these zoning districts is below:

C-1
Neighborhood Commercial. Intended to provide neighborhood convenience centers which are typically a five to ten acre shopping center with a supermarket as the prime tenant. The neighborhood convenience center generally is intended to serve the day-to-day needs of the surrounding neighbors within a one-mile radius.

C-3
Thoroughfare Commercial. Commercial zone for retail and service businesses that are typically related to highways and major thoroughfares. Such uses generally do not lend themselves to be located in general commercial or neighborhood convenience centers, but are encouraged in orderly clusters in suitable locations adjacent to highways and major thoroughfares where special consideration will be given to onsite and off-site traffic and circulation, impact on adjacent land uses, etc.

PD
Planned Development.
• PD-6
• PD-12
• PD-20
• PD-35
• PD-41
• PD-42
• PD-49 – Subareas A and C
• PD-55
• PD-67 – Subareas B and C
As developable land becomes scarcer in the city there may be concern that a proliferation of car washes without further regulation could have adverse impacts on neighborhoods and result in significant, irreversible change to neighborhood and community character. As the city transitions to in-fill development and redevelopment of existing areas, there is less available open commercial land to

Page 408 of 573 ends

DRAFT - Car Washes 4
locate new car wash facilities. Many smaller commercial parcels potentially available for this type of land use may be near or adjacent to residential uses that could be negatively impacted by this use. Unattended or lightly staffed car washes with the potential for traffic and noise impacts may not be the best use of available commercial land, and on those sites that are in close proximity to residentially zoned properties they may not be compatible.

In evaluating the suitability of the land use districts in which car washes are permitted an argument can be made that the Neighborhood Commercial (C-1) Zone may not be the most suitable for allowing a car wash use and perhaps should be reconsidered. Although residential zones abut much of the commercial land in the city, the Neighborhood Commercial Zone is intended for smaller scale, less intensive uses that serve the needs of the immediate neighborhood. Given that development pressure will continue throughout the city for land that will become increasingly scarce, preserving the Neighborhood Commercial Zone for higher and better uses may be an economically strategic option. Furthermore, removing car washes as a conditionally permitted use in the Neighborhood Commercial Zone will minimize, if not eliminate, any potential conflict between car wash operations and sensitive residential receptors. It should be noted that any existing car wash in these districts would be allowed to continue operations as a legal, nonconforming use.

D. Potential Development Standards: The application of development and operational standards for car washes will ensure the consistency of regulations for new car washes and for the expansion of existing car washes. Of principal concern is the impact of car washes on residential uses. The development standards identified below will mitigate against the negative impacts that could result from new and remodeled car wash sites.
• Residential Setback. Whether automatic, by hand, or self-service, the car wash structure (including wash bays) and outdoor vacuuming machines or areas shall be located a minimum distance (e.g., 100 ft. or as LUD sees appropriate) feet from the property line parcel that contains a residential use or that could in the future (i.e., by GP/zoning).
• Openings. All washing facilities shall be located within a building which is enclosed except those openings necessary for vehicular and pedestrian access.

Such openings shall not face any adjacent residentially zoned property. • Queuing of Vehicles. An on-site queuing plan shall be provided to the City for review and approval. Traffic circulation shall be designed to ensure efficient circulation on and off the subject site and ensure that the car wash will not obstruct the use of any service station gasoline dispensers, drive aisles, backup areas, or parking spaces. Furthermore, vehicles shall not queue onto a public street, alley, driveway, or onto adjacent properties/parcels not associated with the car wash use.

Page 409 of 573 ends

DRAFT - Car Washes 5
• Design. All car wash developments shall be subject to the City of Brentwood Commercial and Industrial Design Guidelines. The car wash structure must be architecturally compatible with any other buildings on site and with the surrounding neighborhood.

E. Potential Operational Requirements:
• Hours of Operation. Hours of operation shall be limited to: Monday through Saturday, 8:00 AM to 7:00 PM; and Sunday, 9:00 AM to 6:00 PM or as LUD recommends.
• Water Recycling. Recycling of water used for vehicle washing shall be maximized. The use of recycling water systems and the disposal of water fluids and solids shall comply with applicable state and federal guidelines/standards and must be approved by the Engineering Department.
• Air Quality. All mechanical ventilating equipment shall be directed to exhaust vents and cannot face adjacent residential properties. Exhaust systems shall be equipped with appropriate control systems to minimize or eliminate noxious pollutants that may impact ambient air quality and must adhere to all applicable local, state, and federal air quality standards. • Noise. All uses at the subject site, including any power driven or steam cleaning machinery, drying equipment, or vacuuming machines shall maintain noise levels below the levels provided in Chapter 9.32 Noise Regulations of this Code.
• Outdoor Loudspeakers. The installation and operation of outdoor loudspeakers or public address systems are not permitted.

Page 410 of 573 ends

DRAFT – Short-Term Rentals 1

FOCUSED ZONING CODE UPDATE

2. Short-Term Rentals
Background
A. Short-term Rentals: A short-term rental (STR) is a residential property that is rented for a brief duration, typically for 30 days or less. STRs consist of (1) homesharing, where a room in a dwelling unit or an accessory structure is rented, usually with the owner present, or (2) vacation rentals, where the entire unit is rented out to guests with the owner absent. STRs have become increasingly popular over the past decade as homeowners and renters look for additional sources of income and with the proliferation of platforms such as Airbnb, VRBO, Home-Away, and FlipKey.

The rise in short-term rental activity over the last ten years caught many cities and municipal officials across the country off-guard, as STRs do not fit into normal municipal regulatory structures. Cities have responded by either banning STRs entirely or creating new regulatory systems to allow short-term rental activity.

Currently, the Brentwood Municipal Code (BMC) prohibits short-term rentals constructed, converted, or otherwise developed through the use of the two-unit housing development (SB 9) provisions set forth in BMC § 17.797 and/or through the use of the urban lot split provisions set forth in BMC § 16.169. In addition, the BMC allows rooming and board for not for less than 30 days at a time. Although STRs are not explicitly defined and prohibited, by process of elimination, unless the STR qualifies as rooming and boarding, then it would be prohibited.

In addition, the City struggles to proactively enforce the prohibitions because there are little resource or mechanism to correlate length of stay with STRs to determine if it qualifies as a room and board. Although Community Enrichment does search short-term rental websites throughout the year to see if any Brentwood properties are listed, enforcement is difficult unless the addresses are listed or location is otherwise identifiable. Therefore, the majority of the time the City is reacting to short-term rental complaints as they are received and uses Community Enrichment and Police Department personnel to address each complaint on a case-by-case basis.

Not every city or locality is being impacted by short-term rentals in the same way.

Coastal/beach communities, mountain/ski communities, and communities that can be considered a “destination” either for an attraction, as an employment center, etc., have seen greater STR demand than communities that do not have these characteristics or that may be considered bedroom communities.

Nonetheless, a degree of STR activity seems to be present in most jurisdictions.

Arguments in favor of regulating and allowing STRs include allowing homeowners and renters to generate extra income, making more hotel-like rooms available for

Page 411 of 573 ends

DRAFT – Short-Term Rentals 2
rent in a city, providing alternatives to hotels, and creating an economic spark for the communities where STR visitors choose to stay. Arguments against regulating and allowing STRs are that they decrease the housing supply and increase rental prices by reducing the number of available units, create noise and parking supply issues in neighborhoods, and harm the existing hospitality industry.

Staff believes that the City of Brentwood should be explicitly clear in either prohibiting or allowing short-term rentals and understands that the direction from the City Council is to research prohibiting the use to protect residential neighborhoods. Should the City wish to allow STRs instead, then well-defined rules and regulations would (1) enable STR hosts and visitors to have standards regarding the operation of a short-term rental, (2) help to ensure STRs do not limit the housing market and that neighborhoods and residents are not affected by their operations, and (3) provide the City with additional Transient Occupancy Tax (TOT) collected in the same manner as with hotels.

B. Short-term Renting of Backyards and Swimming Pools: As an off-shoot to the rise of short-term rentals, new platforms are emerging that allow property owners to market their swimming pools, courts, backyards, entire homes, and other on-site amenities for hourly rental. Platforms such as Swimply allow hosts to further commercialize their properties by facilitating pool parties, house parties, photoshoots, dinner parties, etc., at the residence of the host.

Although Airbnb and VRBO have tightened restrictions on having parties in shortterm rentals, the new platforms that cater specifically to hosting events rather than nights stayed can have a negative impact on residential neighborhoods, particularly with regard to noise, traffic, parking, and other nuisance issues.

C. Penalties and Fines: The City’s enforcement efforts on unpermitted short-term rentals and unpermitted rentals of pools and backyards are often reactionary, happening after the fact. Furthermore, the fine for committing the infraction may not be substantial enough to deter the activity.

BMC § 17.890.007 Penalties, states that “Any person who knowingly violates or causes or permits another person to violate any provision of this title is guilty of an infraction, and upon conviction shall be punishable by a fine of not more than two hundred fifty dollars. A violator may be deemed guilty of a separate offense for each day during any portion of which a violation of this title is committed, continued or permitted.”
Analysis
A. General: A booking search for short-term rentals in Brentwood (using July 12-14 and August 2-4) found that only one listing for a private room in a house in the city was available on both Airbnb and VRBO. Similarly, only one listing for a swimming pool rental was available on Swimply (using July 12 and August 2).

Although numerous listings are available in the region, including some neighboring

Page 412 of 573 ends

DRAFT – Short-Term Rentals 3
jurisdictions like Antioch and Discovery Bay, there is relatively little supply in Brentwood itself.

B. Existing Regulations: As noted above, the Brentwood Municipal Code partially prohibits short-term rentals under BMC § 17.796.003 Short-term rentals prohibited, which states:

A. Pursuant to California Government Code Section 65852.21(e), no residential dwelling unit constructed, converted, or otherwise developed through the use of the two-unit housing development provisions set forth in Chapter 17.797 of this code shall be rented, leased, or otherwise let for occupancy for a period of less than thirty calendar days.

B. Pursuant to California Government Code Section 66411.7(h), no residential dwelling unit constructed, converted, or otherwise developed through the use of the urban lot split provisions set forth in Chapter 16.169 of this code shall be rented, leased, or otherwise let for occupancy for a period of less than thirty calendar days.

In addition as noted above, the Brentwood Municipal Code does allow for room and boarding, which is defined in BMC § 17.650.003(4) as follows:

Rooming and boarding, defined as the renting of a room with or without table board to an individual for a duration of not less than thirty consecutive calendar days, shall be permitted as follows:
a. Occupancy to be limited to four paying guests,
b. Occupancy in excess of four guests may be permitted subject to obtaining a conditional use permit,
c. Rooming and boarding shall be conducted only by a person or persons residing on the premises,
d. Off-street parking shall be provided in compliance with Chapter

17.620,
e. The use of signs in conjunction with rooming and boarding shall be prohibited,
f. Rooming and boarding shall be subject to all other applicable city ordinances;
Although STRs are not explicitly defined and prohibited, by process of elimination, unless the STR qualifies as rooming and boarding, then it would be prohibited.

Moreover, commercial activities such as event/social centers are not permitted in residential zones without a Conditional Use Permit, and there are no regulations

Page 413 of 573 ends

DRAFT – Short-Term Rentals 4
in the BMC to explicitly prohibit the rental of backyards, swimming pools, courts, and other similar facilities.

C. Survey of Nearby Cities: A survey of nearby cities was conducted to determine if and how they regulate STRs. The table below depicts the high-level results for a selection of cities in the region, including whether they allow home-sharing, vacation rentals, or both, and any other relevant provisions.

City Home-sharing Vacation Rental Specific Requirements Antioch N/A N/A • No provisions in the
Municipal Code to
regulate or prohibit
Livermore Yes Yes • ADUs that obtained a
building permit on or
after January 1, 2020
cannot be used as STRs
• Hosts allowed only one
STR in city
Martinez No No • No dwelling unit can be
occupied as an STR
Oakley Yes No (but unhosted
stays permitted)
• Minimum stay of 2 nights
required
• Max. number of guests
Pittsburgh N/A N/A • No provisions in the
Municipal Code to
regulate or prohibit
Stockton N/A N/A • No provisions in the
Municipal Code to
regulate or prohibit
Walnut
Creek
N/A N/A • No provisions in the
Municipal Code to
regulate or prohibit
D. Prohibiting Short-term Rentals in Brentwood: While some cities have chosen to ban short-term rentals, the main challenge to this is implementing ongoing enforcement. Resources would be needed to identify who is illegally operating an STR. Since online platforms do not provide addresses of rental units publicly, City staff might need assistance from a consulting firm that has the ability to find this information. Currently, staff does search short-term rental websites throughout the year to see if any Brentwood properties are listed, enforcement is difficult unless the addresses are listed or location is otherwise identifiable. The majority of information received about who is operating an STR is received from the public.

If the public is able to provide information on the specific housing unit, Community

Page 414 of 573 ends

DRAFT – Short-Term Rentals 5
Enrichment staff can then investigate to find any information that is available online prior to contacting the homeowner.

Fortunately for Brentwood there appears to be relatively little STR activity and existing staff can likely handle the anticipated volume of cases. In other jurisdictions where short-term rentals are very active and the city has prohibited the use, significant resources have been needed to enforce the ban. For example, in the City of West Hollywood there was a ban on all STRs from 2015-2018 and staff experienced more than 265 open code enforcement cases related to STRs, mailed over 800 warning letters, and levied over $250,000 in fines. However, the success rate in getting people to respond or remove their listing was low. People would either re-list at a different time or use a different room in their house. Due to the complexity of addressing the ban and the increased demand from residents to allow STRs, the City of West Hollywood now allows STRs through their HomeSharing Program and requires residents to register for a Home-Sharing Business License as of 2018. While Brentwood has a different set of characteristics, the City should anticipate additional staffing resources associated with enforcing a ban.

E. Potential Zoning Ordinance Amendment: Should the City wish to explicitly prohibit STRs of both residential units and outside amenities, then the following draft amendment to the Zoning Ordinance could be considered:

BMC § 17.XXX Short-term rentals prohibited.

It shall be unlawful for any person or entity to offer or make available for rent (via advertisement on a short-term or vacation rental website or otherwise) or to rent (by way of a rental agreement, lease, sublease, license, via a short-term or vacation rental website, or any other means, whether oral or written) for compensation or consideration a home-sharing rental, short-term, or vacation rental for less than 30 days, pursuant to a rental agreement, lease, sublease, license, via a short-term or vacation rental website, or any other means, whether oral or written, for compensation or consideration, or maintain any advertisement of a homesharing rental, short-term, or vacation rental for less than 30 consecutive days. This prohibition shall also include rental of not only the habitable portions of a home or residential property but also rental of swimming pools, courts, backyards, entire homes, and other on-site amenities for hourly rental, daily, or nightly rental.

Page 415 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.2
11/12/2024
SUBJECT: Adoption of User Fee Report for updating Community Development Fees and amending the Cost Allocation Plan to adopt, change and eliminate certain fees
DEPARTMENT: Community Development
STAFF: Alexis Morris, Director of Community Development Kerry Breen, Director of Finance & Information Systems
Tim Nielsen, Development Services Manager

TITLE/RECOMMENDATION
Adopt the User Fee Report and amend the FY 2023/24 Cost Allocation Plan and Schedule of City Fees to adopt, change, and eliminate certain project and permitting fees; and find that the proposed amendments do not constitute a project for the purposes of the California Environmental Quality Act.

FISCAL IMPACT
The proposed updates to the fees contained within the Cost Allocation Plan cover reasonable costs associated with a particular service. The attached fees have no negative impact on the City’s budget as they recover costs for services performed by the City. Elimination of fees as proposed will also not negatively affect the City’s budget, as these costs will still be recovered through proposed fees and are being eliminated to streamline the Cost Allocation Plan.

Should the City Council adopt the changes to the fees as proposed, the General Fund will see revenue growth following implementation of the changes. Determining the amount of the increase is difficult, as permit levels fluctuate both in number and type from year-to-year. Based upon the number and categories of projects processed and permits issued in the past several years, revenue is anticipated to grow by a combined $400,000 per year if activity were to remain stable. This increase in revenue is anticipated to more fully recoup the City’s cost of providing developmentrelated services.

BACKGROUND

PRIOR UPDATES

Page 416 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.2
11/12/2024
Although the City makes minor annual adjustments and modifications to the Cost Allocation Plan (CAP), the last comprehensive update to the City’s development user fees was completed in November 2000. Most Community Development fees in the CAP are updated by CPI on an annual basis, however, this approach has not maintained pace with the City’s actual cost of providing the services. Additionally, preferred methods of fee calculation have significantly evolved since 2000 and the CAP reflects permit types and methods of calculation that no longer align with best practices.

In February 2023, Council approved a focused update to the Cost Allocation Plan amending the City’s valuation tables and a select number of permitting fees to more accurately recover the cost of services provided. Valuation tables allow jurisdictions to determine a fair market cost for the materials and labor required to complete a given project, depending on the planned use and complexity of construction. These are standardized both on a national and on a regional level and the International Code Council updates valuations twice annually. Calculating permitting fees for projects of medium to high complexity off of standardized valuation tables allows for equitable cost recovery for projects of a similar scope. Council approved the 2023 update with the understanding that staff would work on a comprehensive update to the development user fees reflected in the City’s Cost Allocation Plan and subsequently approved funding to complete a fee study with the 2023/2024 midterm budget adjustments.

Staff published a request for proposals and received several competitive proposals from financial consulting companies that specialize in government user fee analysis.

Ultimately, staff selected and awarded a contract to Government Consulting Partners (GCP) to complete a comprehensive evaluation of the City’s development user fees and prepare a user fee report containing recommendations for updates to the City’s Cost Allocation Plan and Schedule of City Fees.

LEGISLATIVE REQUIREMENTS
Prior to the adoption of Proposition 13 in 1978, California cities were less concerned with the recovery of costs for services or potential subsidies of services provided to their customers. In times of fiscal shortages, cities could raise property taxes to fund a variety of services from emergency response, to parks and recreation to development-related services. However, the passage of Proposition 13 changed the landscape, imposing significant constraints on the ability to increase property taxes.

In 1979, voters further restricted the ability of local government to cover the costs of providing services by strictly defining the difference between a ‘fee’ and a ‘tax’ with the passing of Proposition 4. The main difference is that a fee must be no more

Page 417 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.2
11/12/2024
than necessary to cover the reasonable costs to the City to provide the service, product, privilege, or benefit for which the fee is charged. The allocation of the cost to the fee payer must bear a fair or reasonable relationship to the fee payer’s burdens on, or the benefits received from, the City. A fee payer cannot be charged a fee for a service, product, privilege, or benefit if the service, product, privilege, or benefit is provided to anybody who is not charged the fee. Proposition 218, approved in 1996 and Proposition 26 passed in 2010 further define fees and taxes such that fees are presumed to be taxes unless they fall into certain categories now set forth in the California Constitution.

GOALS OF THE STUDY
The principal goal of the development user fee study was to determine the full cost of development-related services and to determine the best methodology for recovering these costs. Staff and Government Consulting Partners additionally determined the following priorities:
 Update the Cost Allocation Plan to reflect modern structure, form and functionality;
 Streamline the manner in which fees are calculated;
 Consider the shift in the historic mix of development away from single-family dwellings toward office/commercial, multifamily and other smaller projects;  Allow for simple updates to accurately reflect future costs and other changes.

The results of the study will allow the City to better understand the true costs of providing services and can serve as a basis for making informed policy decisions regarding the most appropriate fees to collect from applicants requiring individualized services from the City.

METHODOLOGY
The basic concept of a user fee study is to determine the reasonable cost of each service provided by the City for which it charges a user fee. The full cost of providing a service serves as the objective basis as to the maximum amount that may be collected for that particular service. Working with City staff, Government Consulting Partners developed cost and revenue projections for each division, developed an understanding of the City’s existing fee structure and researched and recommended alternative fee structures where a particular fee was contrary to City priorities or policy. Each proposed change is intended to:

Page 418 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.2
11/12/2024
 streamline the fee calculation process;
 increase fee equity across customer groups;
 improve the customer experience; and
 further other objectives in line with existing policies.

Government Consulting Partners also surveyed up to eight comparison agencies to better understand best practice fee structures and trends in the region. The resulting recommendations are:
 reflective of best practices in modern fee structures;  transparent in their intent;
 predictable to the benefit of the City’s customers;
 intended to work with the City’s online permitting portal; and  streamlined and take current and future development trends into consideration.

OVERVIEW OF PROPOSED CHANGES
Government Consulting Partners worked with each division to recommend changes targeted to meet the priorities identified above. These findings are presented in the Development User Fee Report included as Attachment 3. Additionally, a summary of the changes is provided below and the revised Cost Allocation Plan (with proposed changes tracked) is provided as Attachment 4.

Development Services
 Issuance Fees – collect a specific issuance fee according to a tiered structure for all permits instead of non-valuation-based permits only. When applied, this is currently a flat fee.
 SB 9 Projects – identify a flat fee for processing all parcel splits and second home construction under the provisions of SB 9.

Neighborhood Services
 Electrical/Plumbing/Mechanical (EPM) Fees – collect based on valuation for stand-alone projects and as a percentage of a building permit fee for larger projects. This will save significant time in calculating fees that currently rely on an item-count methodology.
 Work Without Permit – establish a fee for conducting work without a permit.

All licensed contractors understand that there is a legal requirement to obtain

Page 419 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.2
11/12/2024
permits prior to performing work. The City does not currently have any penalty for performing work without permits. Although this is not a frequent occurrence, it does happen a handful of times per year and is generally brought to staff’s attention through code enforcement action resulting from neighbor complaints or from the property owner themselves when they find out that work was done on their property without a permit. Establishing a penalty to discourage this practice on the part of contractors is therefore necessary.  Building Permit Fees – the building permit fee table is being adjusted to streamline the table into fewer fee tiers and to accurately reflect the costs associated with providing services based on valuation of the work being completed.

Planning
 New Fee Categories – these are activities for which no fee is currently collected or for which fees are collected under a different type of project. o Temporary signs/banners
o Affordable Housing Review
o Preliminary Application Review
o Planning Review of Building Permits
o Density Bonus Review
o Wireless Facility Permits
 Restructured Fees – The following fees have been restructured to reflect either a tiered structure or a flat fee from a deposit account-based fee structure:
o Street addressing
o Rezoning/Zoning Ordinance Amendment
o Design Review
o Conditional Use Permits
o Tentative Map review
o Variances

NEXT STEPS
If the City Council supports staff’s recommendations, staff will update the City’s permit and project tracking software based on the new streamlined fee schedule and begin collecting fees based on these changes on February 1, 2025.

CITY COUNCIL STRATEGIC INITIATIVE
Not Applicable.

Page 420 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.2
11/12/2024

PREVIOUS ACTION
Previous Action by the City Council is included on Attachment 1.

DATE OF NOTICE
November 1, 2024 and November 8, 2024.

ENVIRONMENTAL DETERMINATION
This amendment of the Cost Allocation Plan and Schedule of City Fees is not subject to CEQA, pursuant to Sections 15273 and 15378(b)(4) of the State CEQA Guidelines because:

1. The amendment of the 2023/2024 Cost Allocation Plan and Schedule of City Fees related to the adoption, changing and elimination of permitting fees is not a project because it is a fiscal activity that does not commit the City to any specific project that may result in a potentially significant impact on the environment; and

2. The purpose of the specified fees is to support those City services that are undertaken as a direct or indirect result of members of the public using the services of the City, and will be collected for the purposes of meeting operational expenses and maintaining service to those who request it.

ALTERNATIVE OPTION(S)
Alternative Options to the Staff Recommendation:

1. Do not approve staff’s recommendation. If the City Council does not support staff’s recommendations, the current fee schedule will remain in effect and the Cost Allocation Plan will be updated as usual based on existing Consumer Price Index formulas. This will result in an ongoing subsidy of project and permitting activity of approximately $415,000.

2. Modify staff’s recommendation. If the City Council supports modifying staff’s recommendations, the City Council would need to provide clear and concise direction on the proposed changes. Staff would then incorporate those changes into the Cost Allocation Plan and update the final fee schedule to begin collecting the new fees on February 1, 2025.

Page 421 of 573 ends

CITY COUNCIL AGENDA ITEM NO. G.2
11/12/2024

ATTACHMENT(S)

1. Previous Action

2. Resolution

3. Brentwood Development User Fee Report prepared by Government Consulting Partners

4. Cost Allocation Plan for Community Development Fees

Page 422 of 573 ends

ATTACHMENT “1”
Previous actions related to this agenda item that were taken by the Council are listed below.

1. November 14, 2000, by Resolution No. 2198 the City Council adopted a report prepared by DMG-Maximus (“Report”) for computing fees for City services and revising City services fees.

2. On February 28, 2023, the City Council adopted Resolution 2023-22 amending the 2022/23 Cost Allocation Plan and Schedule of City Fees to adopt, change and eliminate certain permitting fees; and finding that the proposed amendments did not constitute a project for the purposes of the Environmental Quality Act. Council took this action to adjust the City’s valuation tables and certain permitting fees until a comprehensive development user fee study could be completed.

3. On September 12, 2023, the City Council adopted Resolution 2023-113 1) adopting the FY 2023/24 Cost Allocation Plan and Schedule of City Fees; 2) making certain supporting findings, including the inapplicability of the California Environmental Quality Act to these actions; 3) imposing said fees; 4) establishing a process for waiving or adjusting certain fees; 5) adding certain new Community Development, Police and Public Works fees; and (6) repealing Resolution 2022-122, which adopted the FY 2022/23 Cost Allocation Plan and Schedule of City Fees.

Page 423 of 573 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRENTWOOD ADOPTING

THE USER FEE REPORT PREPARED BY GOVERNMENT CONSULTING PARTNERS AND AMENDING THE 2023/24 COST ALLOCATION PLAN AND SCHEDULE OF CITY

FEES TO ADOPT, CHANGE AND ELIMINATE CERTAIN PROJECT AND PERMITTING FEES; AND FINDING THAT THE PROPOSED AMENDMENTS DO NOT CONSTITUTE

A PROJECT FOR THE PURPOSES OF THE ENVIRONMENTAL QUALITY ACT WHEREAS, Article XI, section 7 of the California Constitution allows the City to impose fees and charges that are not in conflict with the general laws of the State; and WHEREAS, Government Code Sections 65104, 65909.5, 66014 and 66451.2 allow the City to establish fees to offset the City’s administrative costs in processing permits and entitlements; and
WHEREAS, Brentwood Municipal Code § 17.800 requires payment of such processing fees in conjunction with any application submitted for permits, licenses, subdivision maps and entitlements; and
WHEREAS, on November 14, 2000, the City Council adopted Resolution No. 2198, a report prepared by DMG-Maximus (“Report”) for computing fees for City services and revising City services fees; and
WHEREAS, on February 28, 2023, the City Council adopted Resolution No. 2023-22, amending the 2022/23 Cost Allocation Plan and Schedule of City Fees to adopt, change and eliminate certain permitting fees; and finding that the proposed amendments did not constitute a project for the purposes of the Environmental Quality Act; and WHEREAS, on September 12, 2023, the City Council adopted Resolution 2023-113, 1) adopting the FY 2023/24 Cost Allocation Plan and Schedule of City Fees; 2) making certain supporting findings, including the inapplicability of the California Environmental Quality Act to these actions; 3) imposing said fees; 4) establishing a process for waiving or adjusting certain fees; 5) adding certain new Community Development, Police and Public Works fees; and (6) repealing Resolution 2022-122, which adopted the FY 2022/23 Cost Allocation Plan and Schedule of City Fees; and
WHEREAS, staff solicited requests for proposals and selected Government Consulting Partners through a competitive process to prepare a User Fee Report focused on project and permitting fees; and
WHEREAS, staff recommends adopting, changing and eliminating certain project and permitting fees within the Fiscal Year 2023/24 Cost Allocation Plan, as identified in the Development User Fee Report prepared by Government Consulting Partners; and WHEREAS, the proposed amendments and supporting data set forth in this Resolution were available for public inspection and review for ten (10) days prior to a public hearing on this matter; and

Page 424 of 573 ends

WHEREAS, a public hearing was duly noticed and held on November 12, 2024 to consider the proposed revisions to the 2023/24 Cost Allocation Plan.

NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Brentwood that:

Section 1. Findings:

After considering the staff report, Development User Fee Report and other supporting data and the testimony received at a public hearing, the Council makes each of the following findings:

A. That CEQA does not apply to the adoption of this Resolution, pursuant to Sections 15273 and 15378(b)(4) of the State CEQA Guidelines because:

1. The amendment of the 2023/2024 Cost Allocation Plan and Schedule of City Fees related to the adoption, changing and elimination of permitting fees is not a project because it is a fiscal activity that does not commit the City to any specific project that may result in a potentially significant impact on the environment; and

2. The purpose of the specified fees is to support those City services that are undertaken as a direct or indirect result of members of the public using the services of the City, and will be collected for the purposes of meeting operational expenses and maintaining service to those who request it.

B. The staff report, presentation, and testimony establish:

1. That there is a reasonable relationship between the need for the fees and the type of services for which the fees are imposed; and

2. That there is a reasonable relationship between the amount of the fees and the estimated reasonable cost of providing the types of service for which the fees are imposed; and

3. The amount of services provided does not exceed what is reasonably necessary in order to process the requested services; and

4. That the cost estimates set forth in the Development User Fee Report and related amendments to the 2023/24 Cost Allocation Plan are reasonable and best approximate the direct and indirect (overhead) costs of City staff.

C. The allocation of the cost to each fee payor bears a fair and reasonable relationship to the fee payor’s burdens on, and the benefits received from, the City.

D. The amended fees do not exceed the reasonable cost of providing the services for which the fees are charged.

Section 2. Fees Imposed:

A. The Council amends the 2023/24 Cost Allocation Plan as set forth in Attachment 4, which is incorporated here by this reference.

Page 425 of 573 ends

B. Each person requesting a service in the City of Brentwood for which a fee is imposed pursuant to the report shall pay the fee set forth in the report.

C. For the Fiscal Years following Fiscal Year 2023/24, except as otherwise provided in this resolution or by other action of the City Council, on July 1 of each year, all affected permitting fees fees not tied to an alternate index and/or requirement will be automatically adjusted by an amount equal to the percentage of increase or decrease in the Bureau of Labor Statistics Employment Cost Index (ECI) for state and local workers, provided that the resulting fee is still no more than necessary to cover the reasonable costs to the City to provide the service and the allocation of the cost to the fee payor still bears a fair and reasonable relationship to the fee payor’s burdens on, or the benefits received from, the City.

Section 3. Use of Fee Revenues:

The revenues raised by payment of these fees, along with any interest earned, shall be used to pay for the City’s costs, including without limitation the capital costs and labor and contract costs directly or indirectly associated with providing the requested services.

Section 4. Subsequent Analysis of the Fees:

The fees established herein are adopted and implemented by the Council in reliance on the comprehensive studies that have been prepared by the City and consultants to the City. During the coming years, the City will continue to gather additional information that may affect the nature, scope and type of services to be provided in response to requests of the public.

Section 5. Effective Date of Revised Fees:

Except as otherwise provided, the fees established through this resolution will be effective on February 1, 2025.

Section 6. Severability:

Each component of the fees and all portions of this Resolution are severable. Should any individual component of the fee or other provision of this Resolution be adjudged invalid and unenforceable, the remaining provisions shall be and continue to be fully effective, and the fee shall be fully effective except as to that portion that has been judged invalid.

Section 7. Statute of Limitations:

Any judicial action or proceeding to attack, review, set aside, void, or annul the fees established by this Resolution, or the Resolution itself, shall be commenced within one hundred twenty (120) days of the passage of this Resolution. Any action to challenge an adjustment adopted shall be commenced within one hundred twenty (120) days of the adjustment.

Section 8. Prior Resolutions:

Page 426 of 573 ends

Resolution No. 2023-113, which adopted the 2023/24 Cost Allocation Plan and Schedule of City Fees, remains in full effect except as may be amended by this or any other and resolutions of the City Council.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on November 12, 2024, by the following vote:

Page 427 of 573 ends

DEVELOPMENT USER FEE REPORT
September 2024

Page 428 of 573 ends

TABLE OF CONTENTS
Background and Objectives ..…………………………………………………………………………………………..….….1 Background
Brentwood Fee Schedule Priorities
Adopted Development-fee Policy
Fiscal Impact …………..………………..….……………………………………………….…………………………..………….3  Table 1: Fiscal Impact of Proposed Fee Adjustments
Approach and Project Goals ………………….…………….………………………………………..………….….………4 Fee Structure Review Process
 Table 2: Fee Structure Decision Matrix
Proposed Fee Structure
 Table 3: Proposed Fee Structure Changes
Time Data/ Full Cost Calculation
 Table 4: GCP Data Questionnaires
Excel-based Fee Model for Future Updates
Fee Schedule Analysis and Proposed Fees…………………….………………….…………..…….…….…..….9 Development Services
 Description of New or Restructured fees
 Market Survey: Comparison of Select Fees
 Table 5: Fee-by-Fee Analysis Results
Building
 Description of New or Restructured fees
 Market Survey: Comparison of Select Fees
 Table 6: Fee-by-Fee Analysis Results
Planning
 Description of New or Restructured fees
 Market Survey: Comparison of Select Fees
 Table 7: Fee-by-Fee Analysis Results
Appendix: …………………………………………………………………………………..…….…………..…….……....….22  Table 8: Current and Proposed Building Valuation Fee Tables

Page 429 of 573 ends

BACKGROUND AND OBJECTIVES `
`
Government Consulting Partners, Inc (GCP) is a Sacramento based consulting firm specializing in cost and revenue analysis studies for state and local government.

Background
The City of Brentwood engaged GCP to conduct a comprehensive review of the City’s development user fee schedule. The City’s development fees and policies were last comprehensively reviewed in April 2000.

Since that time minor changes have taken place, including adjusting fees annually for inflation.

The Government Finance Officers Association (GFOA) recommends that cities periodically study their fee schedules to ensure profits are not being generated and costs are recovered at levels reflective of Council’s policies and values. As more fiscal limitations are imposed on local government, user fees have become an important source of revenue. A user fee is a payment made by an individual for a service that primarily benefits the individual. Public agencies can impose a user fee for a service when 1) the individual’s decision to use the service is voluntary, and 2) the fee charged to an individual user is reasonably related to the level of service rendered and the cost of providing that service.

User fees in California are required to conform to the statutory requirements of the California Constitution and the California Code of Regulations, including Government Code 66000 et seq. By law, user fees may not exceed the estimated reasonable cost of providing the services for which they were levied approved by a two-thirds vote of the electorate.

In 2022 Brentwood conducted a mini-study targeting select fee issues. The study resulted in the adoption of current building valuation data (BVD) factors for use in calculating the construction valuation for each project. For example, residential construction valuation was increased from $92.34 per square foot up to today’s current value of $160.35 per square foot. The study also instituted reduced plan check fees for tract and multi-family housing that require less than the standard level of review. For non-model units, the fee was reduced from 65% of the building permit fee down to 25% of the building permit fee.

This report presents GCP’s comprehensive review of Brentwood’s development-related user fees with the goal of aligning fees with current fiscal policy and Council priorities.

The City’s scope for this project includes the following components:

1. Prepare a new fee structure customized to Brentwood’s needs and utilizing the City’s existing Cost Allocation Plan (CAP) system

2. Support the programming of new fees into the City’s permitting software

3. Provide any necessary tools to update the fees annually, and

4. Make recommendations for the frequency of future comprehensive reviews.

Brentwood Fee Schedule Priorities
The City’s Request for Proposals (RFP) identifies the following as priorities for the new fee schedule:
 Accurately reflects and recovers the City’s cost of providing services; 1

Page 430 of 573 ends

BACKGROUND AND OBJECTIVES `
`
 Reflects modern structure, form and functionality;
 Streamlines the manner in which fees for permits and applications are calculated;  Considers the construction-mix shift from single family dwelling heavy to increased office/commercial, multifamily and small projects, and
 Is easily updated for future costs and other changes.

Adopted Development Fee Policy
In addition to the priorities spelled out in the City’s RFP, GCP also studied Brentwood’s Council Administrative Policy No 10-5, which provides guidance regarding targeted levels of cost recovery, fee schedule maintenance protocol and other related matters. Relevant excerpts of this policy are presented below.

Policy 10-5 Section 5.1: Ongoing review: Fees will be reviewed and updated on an ongoing basis to ensure that they keep pace with changes in the cost-of-living as well as change in methods or levels of service delivery.

Policy 10-5 Section 5.4: Development Fees Review Program: The following cost-recovery policies apply to the development fees review program. Services provided under this category include:

5.4.1 Planning (planned development permits, tentative tract and parcel maps, re-zonings, general plan amendments, variances, use permits etc.).

5.4.2 Engineering (public improvement plan checks, inspections, subdivision requirements encroachments, etc.).

5.4.3 Building (enforcement of California building, electrical, plumbing and mechanical codes and other codes, laws and ordinances).

5.4.4 Cost recovery for these services should generally be very high. In most instances, the City’s cost recovery goal should be 100%. Exceptions to this standard include appeals, where the fee is set very low to provide adequate opportunity for due process.

In adherence to the existing policy, proposed fees have been set at 100% cost recovery levels, except for appeal fees, which are heavily subsidized. The proposed fee schedule adds new fee categories, eliminates others and modifies certain categories to better reflect Councils goals for the development fee schedules.

The overall goal of this report is to provide the study’s results in a relevant yet concise format that allows City decision-makers to make informed user fee pricing decisions. 2

Page 431 of 573 ends

APPROACH & PROJECT GOALS `
`
In cooperation with City staff, GCP developed cost and revenue projections for each division under study.

Costs and revenues were projected by extrapolating individual per-unit results for an entire year of demand/activity.

Due to extensive fee structure changes, GCP recommends the City take a conservative approach to budgeting for new revenue. This is due to uncertainty regarding the future demand for these new and restructured categories.

Table 1 summarizes the fiscal impact of our analysis and our recommended adjustments.

Table 1: Fiscal Impact of Proposed Fee Adjustments
Annual revenue from fee services under review
totaled $2,589,030 in Fiscal Year 2023/24. The
fully burdened cost to perform these services
is $3,004,909 for a $415,879 subsidy. If all
proposed fee adjustments are adopted the City
should anticipate an extra $406,864 in annual
fee revenue, nearly covering the full cost of
services provided.

The proposed fees reflect a net increase in fee
revenue for each division. This is likely due to
the City’s policy of adjusting fees annually by a
Consumer Price index (CPI) factor, instead of
an index that tracks the cost of government employees.

The graph above illustrates the differing effects, CPI factor vs Cost of Living Adjustment (COLA) factor on a $100 permit from 2001. It is uncertain whether labor costs will continue to outpace inflationary costs in the near future. However, because the cost of services is largely affected by changes in labor costs, we recommend the City adjust all non-valuation-based fees annually by the Bureau of Labor Statistics Employment Cost Index (ECI) for state and local workers. 3

Page 432 of 573 ends

APPROACH & PROJECT GOALS `
`
At the beginning of the project GCP met with City management to better understand the City’s goals and priorities for the master fee schedule. A workplan was then developed to ensure the proposed master fee schedule reflects those priorities.

Fee Structure Review Process
A key component of the workplan included researching and recommending alternative fee structures where a particular fee was deemed counter to Council priorities or policy. Table 2 illustrates the fee review process. Every proposed change either streamlines the fee calculation process, increases fee equity across customer groups, improves customer experience or otherwise furthers Councils objectives for the development fee schedules.

GCP surveyed up to eight different Building and Planning operations to better understand regional best practice fee structures and trends. Many of these survey cities are from Brentwood’s standard comparison city listing. GCP shared this compiled data with City staff as well as the actual fee schedules from neighboring agencies.

This task provided City staff with an
appreciation for the various fee structure
alternatives employed by regional agencies
as well as industry standards and norms.
o Reflect Modern Structure
Over time best-practice fee structures
change as the development industry
changes. Brentwood’s construction mix
has changed from single-family-home
dominant to a variety of other project
types, including multi-family and
maintenance-type projects. Also, customer
demands and expectations have change as
well. GCP worked with Brentwood staff to
design a structure that meets today’s
construction mix and use of cutting edge
technology.
o Transparent
All flat and tiered fees are supported by
average processing times and staffing fully
burdened hourly rates.
4

Page 433 of 573 ends

APPROACH & PROJECT GOALS `
`
o Predictable
Reducing reliance on deposit-based fees in favor of flat or tiered structures increases predictability for the development community. For example, bathroom remodels and kitchen remodels are two of the most common projects undertaken by homeowners. To increase predictability, GCP and City staff developed flat fees for each of these projects.
o Customer-friendly
The City recently instituted a customer portal enabling electronic plan submittals and payment services, greatly reducing wait times at the public counter. Currently 83% of plans are submitted electronically.

GCP worked with Development Services staff to ensure all recommended fees are supported by the new on-line portal.

It should be noted the City will need to update the permitting software used to assess and collect money from residents and the development community. GCP recommends that this Development User Fee Report be consulted when reprogramming the system.
o Streamlined
Streamlining the fee schedule was a major focus of the study. A streamlined fee schedule saves valuable time for both counter staff and the development community. This is especially true for homeowners nof familiar with development fee schedules and nomenclature. Examples of streamlining by division are provided below.
 Development Services
The division assesses a flat $111 issuance fee each time a new permit is pulled. Small standalone projects require just one permit, whereas a large project might require dozens of permits. GCP worked with the Development Services Manager to design a one-time fee charged at project initiation based on each projects construction value.  Building
The division’s electrical, mechanical and plumbing subtrade permits were modified from a per-unit count of all fixtures, receptacles and outlets to a tiered structure based on project valuation.

The valuation fee table was modified to raise the minimum project valuation amount from $500 up to $2,000 to better reflect today’s pricing.
 Planning
Reduced deposit account usage. Many services were converted from a deposit system to a flat, tiered or percentage-based structure. Reduces the administrative burden on staff from having to track time by project, which can be difficult as they often work on multiple projects in one day.
5 str

Page 434 of 573 ends

APPROACH & PROJECT GOALS `
`
o Consideration for Future Construction Mix/ Trends
Since the last comprehensive fee study the City has transitioned from a construction mix of primarily single-family tract housing to increased levels of commercial, multi-family residential housing and small remodels and miscellaneous projects.

For each fee-related service GCP guided staff to consider projects at each end of the size spectrum and consider whether the existing structure adequately recovers the cost of servicing these projects. Where it was deemed the existing structure inadequately recovered costs for either small or large projects, an alternative structure was researched and selected.

Proposed Fee Structure
After GCP and City staff discussed and reviewed all available fee structure options a final consensus was reached for each group of fees. Table 3 summarizes the proposed fee structure changes.

Table 3: Proposed Fee Structure Changes
Time Data/ Full Cost Calculation
Once all fee structure decisions were finalized, GCP and the City’s subject matter experts began the next phase of the project: developing reasonable time data for each proposed fee category. California law 6

Page 435 of 573 ends

APPROACH & PROJECT GOALS `
`
states that development-related user fees must not exceed the estimated reasonable cost of providing a particular service.

Accordingly, to ensure legal defensibility, proposed fees must not exceed the average time required for City employees and/or contract staff to perform the required reviews and inspections.

Per Unit Cost Analysis
GCP conducted a series of focus meetings with subject matter experts to review available data from the City’s systems and create a gameplan to obtain remaining outstanding data. Actual fee by fee results are presented in the Individual Fee Analysis and Recommendations section beginning on page 9. Staff time estimates underpinning each individual proposed fee are provided in the Appendix beginning on page 14.

Per Unit Time Data
GCP worked with City subject matter experts to identify tasks necessary to perform each permit and application and associated time requirements broken-down by task. Data from the City’s Central Square permitting system was queried to help inform staff’s time estimates.

Screenshots of questionnaires used by GCP staff to collect data are provided below:
7

Page 436 of 573 ends

APPROACH & PROJECT GOALS `
`
Reasonableness Checks
After several rounds of reasonableness checks and revisions GCP entered final time figures into the fee model along with associated cost data. The graphic below presents several reasonableness-check examples.

These checks were used to focus GCP and
staff’s internal quality control reviews on fees
that are outliers in one way or another.

Annual Projections/ Annualized Information
In addition to 100% full cost calculations, GCP
projected annual revenue for each fee service
based on estimates of demand. Demand
estimates were based on the following set of
assumptions.

Demand figures were adjusted in several cases
to approximate actual 2023/24 revenue
figures.

Excel-based Fee Model for Future Updates
GCP prepared a customized fee model to meet the needs of Brentwood’s Development Services, Building and Planning divisions. The model can be updated in future years to add or delete fee categories, modify time data and staffing costs. and
At the end of the study the model is turned over to designated City staff responsible for updating development user fees in the future.
8 , and evaluate changes in permitting trends.

Page 437 of 573 ends

COST OF SERVICE ANALYSIS: DEVELOPMENT SERVICES `
The Development Services division is the first point of contact for developers and the public wishing to submit building plans for review or planning applications. Division staff coordinate the permit review process between internal and external plan checkers and outside agencies responsible for the review of new development. Division staff are also responsible for maintaining the City’s permitting system and operation of the Permit Center.

This section describes the analysis of Brentwood’s administrative costs of reviewing various permit and other entitlement applications. Development Services provides these services at the request of property owners, contractors and developers seeking to develop or otherwise modify their property.

Description of Services
Customers may submit planning and building applications, plans, or documents in five different ways: 1) through the electronic submittal portal 2) by scheduling an appointment, 3) by visiting City Hall during walk-in hours, 4) any time during normal business hours in the designated drop-off area in the permit center, and 5) through USPS or other delivery services.

All non-valuation based fees submittals are assessed an issuance fee of $111 to cover the cost of receiving, routing, permit issuance, and collection of monies due.

New or Restructured Fee Categories
GCP recommends the that issuance fee be extended to all permits, including valuation-based permits.

This will establish a discrete funding source for the Development Services division, enabling a better matchup of costs with revenues.

Currently a flat fee of $111 is assessed per permit. GCP worked with staff to develop a tiered structure based on project valuation as follows:
9 Page 438 of 573
COST OF SERVICE ANALYSIS: DEVELOPMENT SERVICES `
Regional Fee Comparison
The following graphs provide a view of how Brentwood’s issuance fees compare against regional agencies.

Detailed Development Services Fee Analysis
The following tables present GCP’s analysis of Development Services user fee costs and revenues and proposed fee adjustments. Information is presented on both a per-unit and annual basis. 10

Page 439 of 573 ends

NOTES
Restructure Notes
1 $0 - $8,000 Valuation 1,190 $111 each pmt $85 130% $132,090 $101,472 ($30,618) $101,150 ($30,940) Each permit -> Flat Fee 2 $8,001 - $50,000 Valuation 1,030 $111 each pmt $171 65% $171,495 $175,658 $4,163 $175,327 $3,832 Each permit -> Flat Fee 3 $50,001 - $1,000,000 Valuation 250
Recovered by
Bldg Permit $440 25% $55,500 $138,500 $83,000 $138,500 $83,000 Each permit -> Per Valuation 4 $1,000,001 + Valuation 5
Recovered by
Bldg Permit $668 17% $2,220 $3,342 $1,122 $3,342 $1,122 Each permit -> Per Valuation 5 SB9 Parcel Split 0 New $2,162 0% $0 $0 $0 $0 $0 New Flat Fee 6 SB9 Second Home Construction Only 0 New $1,130 0% $0 $0 $0 $0 $0 New Flat Fee 7 SB9 Parcel Split and Second Home Construction 0 New $2,751 0% $0 $0 $0 $0 $0 New Flat Fee $361,305 $418,973 $57,668 $418,319 $57,014
1) # per year: these figures reflects staff's best estimate of future demand, based on the average number of projects over the last three years. 2) Current Fee Revenue: reflects the average current fee for each range (# pmts X $111) times the # per year figure. 3) Proposed Revenue: reflects the # per year times the average proposed fee for each range.

CITY OF BRENTWOOD

DEVELOPMENT SERVICES PER UNIT ANALYSIS ANNUALIZED PROJECTIONS # PER
YEAR 1
Current
Fee
Cost Per
Unit
Cost
Recovery
Proposed
Fee
Current Fee
Revenue2

GRAND TOTALS
$2,160
$1,130
$2,750
Revenue
Increase/
FEE CATEGORY Decrease
$85
$170
$440 +$2.28
per $10,000 of
Total Proj
Valuation
$668 + $11.32
per $100,000
of Total Proj
Valuation
Annual Cost
Subsidy/
Surplus
Proposed
Revenue3
11

Page 440 of 573 ends

COST OF SERVICE ANALYSIS: BUILDING `
This section describes the analysis of Brentwood’s cost of providing building plan check and inspection services to homeowners and the development community. The Building division provides these services at the request of property owners seeking to develop or improve their property.

Description of Services
The City’s Building staff provide a variety of services related to the review of building plans and subsequent inspection of structural, electrical, plumbing and mechanical work performed. These services are the primary subject of this analysis.

The division’s building permit fees are charged based on the construction value of the structure being built. Construction value differs from market value. Whereas market value reflects how much a property is likely to sell for on the market, construction value includes only the cost of raw materials and labor, but not land costs or profit. Plan checks are charged as a percentage of the associated building permit fee.

Electrical, plumbing and mechanical inspections are charged based on an item-count of the various fixtures, appliances, outlets inspected. Each item has an individual fee/price to cover inspection costs.

These individual item inspection prices are counted, tabulated and charged to the developer.

New or Restructured Fees

1. Electrical, plumbing and mechanical fees. Based on a review of industry best practices GCP recommends streamlining the City’s subtrade inspections (electrical, plumbing and mechanical) away from the current item-count methodology which is quite cumbersome for both staff and the community to calculate.
 Stand-alone Projects – electrical, plumbing and mechanical inspections not associated with a building permit (i.e. no structural work) will be charged on a slidingscale based on the value of the work inspected:
 Commercial/Industrial Projects – electrical, plumbing and mechanical inspections associated with a commercial or industrial building permit will be charged a fee equal to 20% of the building permit.
 Miscellaneous inspections – all electrical, plumbing or mechanical inspections not otherwise addressed will be charged a flat fee representing 15 minutes of inspection time (currently approximately $70).

2. Penalty for Performing Work without a Permit. It is common in the industry to assess a penalty to developers or subcontractors who intentionally perform work without first obtaining permission from the City. GCP recommends institution of a penalty fee of two times the original fee amount that was circumvented. Plus the original fee must be paid.

Stand Alone EMP Permits
$1 to $2,000 valuation $150 each
$2,001 to $5,000 valuation $210 flat
$5,001 to $10,000 valuation $300 flat
$10,001+ valuation $400 flat
12 Page 441 of 573
COST OF SERVICE ANALYSIS: BUILDING `
This fee is intended to encourage proper review of plans and inspection of work for life safety purposes prior to initiation of any work on the project.

Regional Fee Comparison
The following graphs provide a view of how Brentwood’s current and proposed Building fees compare against regional agencies.
13

Page 442 of 573 ends

COST OF SERVICE ANALYSIS: BUILDING `
Detailed Building Fee Analysis
The following tables present GCP’s analysis of Building user fee costs and revenues and proposed fee adjustments. Information is presented on both a per-unit and annual basis. 14 Page 443 of 573
NOTES
Restructure Notes
Building Permit Fees
1 Under $2,000 Project 25 $105 $211 50% $210 base $2,617 $5,275 $2,659 $5,275 $2,659 2 $2,000 Valuation Project 648 $190 $211 90% $210 base $123,399 $136,728 $13,329 $136,728 $13,329 Valuation-based fees 3 $25,000 Valuation Project 276 $783 $1,013 77% $1,010 base $216,188 $279,588 $63,400 $279,588 $63,400 should not be adjusted 4 $50,000 Valuation Project 111 $1,249 $1,519 82% $1,510 base $138,646 $168,609 $29,963 $168,609 $29,963 by a CPI factor. Instead 5 $100,000 Valuation Project 67 $1,885 $2,462 77% $2,460 base $126,322 $164,954 $38,632 $164,954 $38,632 gjg fgg 6 $500,000 Valuation Project 34 $5,915 $6,429 92% $6,420 base $201,099 $218,586 $17,487 $218,586 $17,487 $0 7 $1M Valuation Project 3 $10,117 $12,042 84% $12,040 base $30,352 $36,126 $5,774 $36,126 $5,774 factors annually. 8 Per each $1,000 over $1M 911 $5.62 $5.62 100% $5.62 each $5,120 $5,120 $0 $5,120 $0 9 Bathroom Remodel 9 $978 $844 100% $840 flat $8,804 $7,596 ($1,208) $7,596 ($1,208) Valuation -> Flat Fee 10 Kitchen Remodel 37 $1,643 $914 100% $910 flat $60,802 $33,818 ($26,984) $33,818 ($26,984) Valuation -> Flat Fee 11 Building Plan Check 65% n/a 100% 65% $309,388 $303,200 ($6,188) $303,200 ($6,188) No Change 12 Tract Home Repeats and MF units 25% n/a 100% 25% No Change 13 Electrical Plan Check 65% n/a 100% 65% $115,342 $113,035 ($2,307) $113,035 ($2,307) No Change 14 Plumbing Plan Check 65% n/a 100% 65% $19,078 $18,697 ($382) $18,697 ($382) No Change 15 Mechancial Plan Check 65% n/a 100% 65% $23,742 $23,267 ($475) $23,267 ($475) No Change Stand Alone EMP Permits
16 $1 to $2,000 valuation 127 $104.66 $155 100% $150 each $13,292 $19,685 $6,393 $19,685 $6,393 Fixture count -> Tiered Flat Fee 17 $2,001 to $5,000 valuation 224 $104.66 $211 100% $210 flat $23,444 $47,264 $23,820 $47,264 $23,820 Fixture count -> Tiered Flat Fee 18 $5,001 to $10,000 valuation 147 $104.66 $309 100% $300 flat $15,385 $45,423 $30,038 $45,423 $30,038 Fixture count -> Tiered Flat Fee 19 $10,001+ valuation 109 $104.66 $408 100% $400 flat $11,408 $44,472 $33,064 $44,472 $33,064 Fixture count -> Tiered Flat Fee 20 EPM Miscellaneous Item/Fixture Permits 5,764 $70.00 $70 100% $70 flat $403,452 $403,452 $0 $403,452 $0 New Flat Catchall Category Commercial/Industrial Projects
21 Electrical permits New n/a 100% 20% BP n/a n/a n/a n/a n/a 22 Plumbing permits New n/a 100% 20% BP n/a n/a n/a n/a n/a 23 Mechanical permits New n/a 100% 20% BP n/a n/a n/a n/a n/a Solar Heating and Cooling Systems
21 Resid 10 kW or less 10 $0 $0 n/a $450 n/a $0 n/a $4,500 n/a Fee set by State 22 Resid per additional kW 10 $0 $0 n/a $15 n/a $0 n/a $150 n/a Fee set by State 23 Comm 50 kW or less 10 $0 $0 n/a $1,000 n/a $0 n/a $10,000 n/a Fee set by State 24 Comm per add'l kW between 51 and 250 kW 10 $0 $0 n/a $7 n/a $0 n/a $70 n/a Fee set by State 25 Comm per add'l kW above 250 kW 10 $0 $0 n/a $5 n/a $0 n/a $50 n/a Fee set by State Solar Energy Storage (Battery)
26 First Battery 10 $0 $0 n/a $200 n/a $0 n/a $2,000 n/a Fee set by State 27 Each additional battery 10 $0 $0 n/a $15 n/a $0 n/a $150 n/a Fee set by State 28 Work Without Obtaining permit New n/a n/a 2X Pmt fee n/a $0 n/a n/a n/a Penalty in addition to original fee $1,847,878 $2,074,895 $227,017 $2,074,895 $227,017

CITY OF BRENTWOOD

BUILDING DEPARTMENT PER UNIT ANALYSIS ANNUALIZED PROJECTIONS # PER
YEAR
Current
Fee
Revenue
Increase/
FEE CATEGORY Decrease

BUILDING PERMITS BUILDING PERMITS

PLAN CHECKS PLAN CHECKS
Annual Cost
Subsidy/
Surplus
Proposed
Revenue
Cost Per
Unit
Cost
Recovery
Proposed
Fee
Current Fee
Revenue

ELECTRICAL, MECHANICAL, PLUMBING PERMITS ELECTRICAL, MECHANICAL, PLUMBING PERMITS

GRAND TOTALS

SOLAR PERMITS SOLAR PERMITS

PENALTY PENALTY
15 Page 444 of 573
COST OF SERVICE ANALYSIS: PLANNING `
The Planning division is responsible for implementing City policies that direct the physical development of the City. The division establishes conformance to local goals for development, adopted General Plan policies, and evaluates the environmental consequences of new development.

This section describes the analysis of Brentwood’s cost of reviewing various current planning applications and entitlements. The Planning division provides these services at the request of property owners seeking to develop or change the use of their property.

Description of Services
The Planning division uses two methods of recovering costs: flat fees and deposit-based charges. GCP and Planning staff reviewed a sampling of past deposit-based projects to assess which could equitably be charged via a flat or tiered structure.

New Fee Categories

1. Temporary signs/ banners $25 each

2. Affordable Housing Review
 Legal or consultant: 25% of contract
 AB 2011 review: $7,320 flat

3. Preliminary Application Review
 SB 330: $1,950 flat
 All others: $1,300 flat

4. Planning review of Building Permit $240 flat

5. Density Bonus Review $5,200 flat

6. Wireless Facility Permit
 Administrative permit: $1,620 flat
 Conditional permit: $10,090 flat
 Accessory small cell: $1,620 flat
Restructured Fee Categories

1. Street Addressing: restructured from a flat fee of $211 to tiered categories:
 1 unit: $320 flat
 2-9 units: $650 flat
 10-50 units: $970 flat
 51-100 units: $1,300
 101+ units: $1,620

2. The following Deposit-based fees are proposed to be charged as flat fees to increase transparency, predictability and reduce the costs associated with time tracking.  Rezoning/ zoning ordinance amendments
 Design reviews
 Conditional use permits
 Tentative map reviews
 Variances
16 Page 445 of 573
COST OF SERVICE ANALYSIS: PLANNING `
Regional Fee Comparison
The following graphs provide a view of how Brentwood’s current and proposed Planning fees compare against regional agencies.
17 Page 446 of 573
COST OF SERVICE ANALYSIS: PLANNING `
Detailed Planning Fee Analysis
The following tables present GCP’s analysis of Planning user fee costs and revenues and proposed fee adjustments. Information is presented on both a per-unit and annual basis. 18 Page 447 of 573
NOTES
Restructure Notes
1 CUP Daycare (single family residence) $281 n/a 100% n/a n/a n/a n/a n/a Eliminate as per H&S Code 1596.72 2 Parcel Map Waiver 1 $3,411 $3,581 95% $3,580 flat $3,411 $3,581 $170 $3,580 $169 3 Variance- Administrative 1 $1,100 $1,953 56% $1,950 flat $1,100 $1,953 $853 $1,950 $850 4 Sign Permit/Review- Administrative 50 $353 $326 108% $320 flat $17,650 $16,276 ($1,375) $16,000 ($1,650) 5 Sign Permit/Review- Temp Signs or Banners 80 No Charge $146 0% $25 flat $0 $11,718 $11,718 $2,000 $2,000 6 Environmental Review
Consultant
Cost + 25% varies 100% n/a n/a n/a n/a n/a
Affordable Housing
7 Legal Review or Consulting
Consultant
Cost + 25% varies 100% n/a n/a n/a n/a n/a
8 AB 2011 Review 1 New $7,324 0% $7,320 flat $0 $7,324 $7,324 $7,320 $7,320 New Flat Fee 9 Appeals 1 $425 $2,930 15% $2,920 flat $425 $2,930 $2,505 $2,920 $2,495 10 Categorical Exemption $233 $651 36% $650 flat $0 $0 $0 $0 $0 Temporary Use Permit
11 Minor 5 $74 $76 97% $70 flat $370 $380 $10 $350 ($20) 12 Staff Level 7 $981 $1,302 75% $1,300 flat $6,867 $9,114 $2,247 $9,100 $2,233 13 Planning Commission $981 $3,906 25% $3,900 flat $0 $0 $0 $0 $0 14 Time Extension 2 $1,605 $3,581 45% $3,580 flat $3,210 $7,161 $3,951 $7,160 $3,950 15 General Plan Maintenance Fee $394 n/a n/a $394 each n/a $0 n/a $0 n/a No Change Recommended Street Addressing
16 1 unit 7 $0 $326 0% $320 flat $0 $2,279 $2,279 $2,240 $2,240 New Tiered Fee 17 2-9 units $233 $651 36% $650 flat $0 $0 $0 $0 $0 Convert to Tiered Fee 18 10-50 units 1 $233 $977 24% $970 flat $233 $977 $744 $970 $737 Convert to Tiered Fee 19 51-100 units 1 $233 $1,302 18% $1,300 flat $233 $1,302 $1,069 $1,300 $1,067 Convert to Tiered Fee 20 101+ units $233 $1,628 14% $1,620 flat $0 $0 $0 $0 $0 Convert to Tiered Fee 21 Secondary Units $60 $5,859 1% $160 flat $0 $0 $0 $0 $0 New Flat Fee 22 Peer Review (Legal, Consultant)
Consultant
Cost + 25% varies 100% n/a n/a n/a n/a n/a
23 Special Studies (Traffic, Environmental, etc.)
Consultant
Cost + 25% varies 100% n/a n/a n/a n/a n/a
24 Adult Oriented Zoning Review $5,609 $0 n/a $5,609 flat $0 $0 $0 $0 $0 No activity - Keep on Fee Schedule Preliminary Application Review
25 SB 330 5 No Charge $1,953 0% $1,950 flat $0 $9,765 $9,765 $9,750 $9,750 New Flat Fee 26 All Others 5 No Charge $1,302 0% $1,300 flat $0 $6,510 $6,510 $6,500 $6,500 New Flat Fee 27 Outdoor Dining/Merchandise Display Review No Charge $0 0% n/a $0 n/a $0 n/a Eliminate Fee Category 28 Home Occupation Zoning Review 175 $50 $54 92% $50 flat $8,750 $9,494 $744 $8,750 $0 29 Archival Fee $212 $0 0% n/a $0 n/a $0 n/a Eliminate Fee Category 30 Landscape Review - (Private Landscaping) 2
Consultant
Cost + 25% varies 100% n/a n/a n/a n/a n/a
31 Consultant Planning Services
Consultant
Cost + 25% varies 100% n/a n/a n/a n/a n/a
Delete
Consultant
Cost + 25%
Consultant
Cost + 25%
incld $3,000
deposit
Delete
Annual Cost
Subsidy/
Surplus
Proposed
Revenue
Revenue
Increase/
Decrease
Delete
Consultant
Cost + 25%
Consultant
Cost + 25%
Consultant
Cost + 25%
Consultant
Cost + 25%

FEE CATEGORY

FIXED FEES FIXED FEES

CITY OF BRENTWOOD

PLANNING DEPARTMENT PER UNIT ANALYSIS ANNUALIZED PROJECTIONS # PER
YEAR
Current
Fee
Cost Per
Unit
Cost
Recovery
Proposed
Fee
Current Fee
Revenue
19 31
32 Planning Review of Building Permit 200 NEW $244 0% $240 flat $0 $48,827 $48,827 $48,000 $48,000 New Flat Fee 33 Density Bonus 3 NEW $5,208 0% $5,200 flat $0 $15,624 $15,624 $15,600 $15,600 New Flat Fee

Page 448 of 573 ends

NOTES
FEE CATEGORY Restructure Notes

CITY OF BRENTWOOD

PLANNING DEPARTMENT PER UNIT ANALYSIS ANNUALIZED PROJECTIONS # PER
YEAR
Current
Fee
Cost Per
Unit
Cost
Recovery
Proposed
Fee
Current Fee
Revenue Annual Cost
Subsidy/
Surplus
Proposed
Revenue
Revenue
Increase/
Decrease
Wireless Facilities:
34 Administrative Permit 6409 5 NEW $1,628 0% $1,620 flat $0 $8,138 $8,138 $8,100 $8,100 New Flat Fee 35 Conditional Permit 1 NEW $10,091 0% $10,090 flat $0 $10,091 $10,091 $10,090 $10,090 New Flat Fee 36 Accessory Small Cell NEW $1,628 0% $1,620 flat $0 $0 $0 $0 $0 New Flat Fee $42,249 $173,443 $131,194 $161,680 $119,431
37 Annexations Deposit varies 100% varies varies $0 varies $0 Stays Deposit-based 38 General/Specific Plan Amendment 1 Deposit varies 100% varies varies $0 varies $0 Stays Deposit-based 39 Development Agreement Deposit varies 100% varies varies $0 varies $0 Rezoning/Zoning Ordinance Amendment
40 Maps 1 Deposit $9,887 100% $9,880 flat varies $9,887 $0 $9,880 $0 Convert to Flat Fee 41 Text 1 Deposit $9,887 100% $9,880 flat varies $9,887 $0 $9,880 $0 Convert to Flat Fee 42 Map and Text 1 Deposit $14,566 100% $14,560 flat varies $14,566 $0 $14,560 $0 Convert to Flat Fee Design Review
43 Administrative DTSP Residential 1 Deposit $3,255 100% $3,250 flat varies $3,255 $0 $3,250 $0 Convert to Tiered Fee 44 Administrative Other 5 Deposit $326 100% $320 flat varies $1,628 $0 $1,600 $0 Convert to Tiered Fee 45 Residential: 1 unit 3 Deposit $5,208 100% $5,200 flat varies $15,624 $0 $15,600 $0 Convert to Tiered Fee 46 Residential: 2-9 units 1 Deposit $7,812 100% $7,810 flat varies $7,812 $0 $7,810 $0 Convert to Tiered Fee 47 Residential: 10-50 units 1 Deposit $15,045 100% $15,040 flat varies $15,045 $0 $15,040 $0 Convert to Tiered Fee 48 Residential: 51-100 units 1 Deposit $19,673 100% $19,670 flat varies $19,673 $0 $19,670 $0 Convert to Tiered Fee 49 Residential: 101+ units 1 Deposit $25,278 100% $25,270 flat varies $25,278 $0 $25,270 $0 Convert to Tiered Fee 50 Commercial up to 10,000 sf 5 Deposit $13,570 100% $13,560 flat varies $67,848 $0 $67,800 $0 Convert to Tiered Fee 51 Each Add'l 5,000 sq ft above 10,000 2 Deposit $977 100% $970 each varies $1,953 $0 $1,940 $0 Convert to Per Each Conditional Use Permit
52 Existing Structure 4 Deposit $5,859 100% $5,850 flat varies $23,437 $0 $23,400 $0 Convert to Flat Fee 53 New Structure 4 Deposit $10,091 100% $10,090 flat varies $40,363 $0 $40,360 $0 Convert to Flat Fee Tentative Maps
54 Parcel Map 4 Deposit $3,581 100% $3,580 flat varies $14,322 n/a $14,320 $0 Convert to Flat Fee Tract Map 5-50 lots
55 Base fee 1 Deposit $6,510 100% $6,510 flat varies $6,510 $0 $6,510 $0 Convert to Tiered Fee 56 Per lot over 5 40 Deposit $203 100% $200 each varies $8,102 $0 $8,000 $0 Convert to Per Each Tract Map 51-100 lots
57 Base fee 1 Deposit $15,624 100% $15,620 flat varies $15,624 $0 $15,620 $0 Convert to Tiered Fee 58 Per lot over 51 30 Deposit $106 100% $100 each varies $0 $0 $3,000 $0 Convert to Per Each Tract Map 101+ lots
59 Base fee 1 Deposit $20,833 100% $20,830 flat varies $20,833 $0 $20,830 $0 Convert to Tiered Fee 60 Per lot over 101 15 Deposit $50 100% $50 each varies $0 $0 $750 $0 Convert to Per Each 61 Variance- Planning Commission 1 Deposit $7,812 100% $7,810 flat varies $7,812 $0 $7,810 $0 Convert to Flat Fee 62 Sign Permit/Review- PC Approval 1 Deposit $3,255 100% $3,250 flat varies $3,255 $0 $3,250 $0 Convert to Flat Fee

FIXED FEE SUBTOTAL

DEPOSIT-BASED FEES DEPOSIT-BASED FEES

FIXED FEES FIXED FEES
Deposit
Deposit
Deposit
20 Page 449 of 573
NOTES
Annual Cost Restructure Notes
Subsidy/
Surplus
Proposed
Revenue
Revenue
Increase/ FEE CATEGORY Decrease

CITY OF BRENTWOOD

PLANNING DEPARTMENT PER UNIT ANALYSIS ANNUALIZED PROJECTIONS # PER
YEAR
Current
Fee
Cost Per
Unit
Cost
Recovery
Proposed
Fee
Current Fee
Revenue
63 Administrative Oil Permit Deposit varies 100% n/a n/a n/a n/a n/a Eliminate Fee Category 64 Amendment- 6409 5 Deposit $977 100% $970 flat varies $4,883 $0 $4,850 $0 Convert to Flat Fee 65 Amendments- Other 5 Deposit varies 100% n/a n/a n/a n/a n/a Convert to 75% of original permit 66 Residential Condominium Conversion Deposit $5,859 n/a $5,850 flat varies $0 $0 $0 $0 Convert to Flat Fee varies $337,598 varies $341,000 n/a

DEPOSIT-BASED FEES DEPOSIT-BASED FEES
Delete
75% of orig fee

DEPOSIT-BASED FEE SUBTOTAL
21 Page 450 of 573
APPENDIX: Current and Proposed Building Permit
Valuation Fee Table `
22

Page 451 of 573 ends

Group (2021 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB A‐1 Assembly, theaters, with stage $309.06 $298.66 $291.64 $280.58 $263.98 $225.82 $ 272.02 $244.80 $ 237.02 A‐1 Assembly, theaters, without stage $282.85 $272.45 $265.42 $254.37 $237.77 $229.61 $ 245.81 $218.59 $ 210.80 A‐2 Assembly, nightclubs $237.31 $230.23 $224.56 $215.36 $202.99 $197.40 $ 207.69 $183.68 $ 177.40 A‐2 Assembly, restaurants, bars, banquet halls $236.31 $299.23 $222.56 $214.36 $200.99 $196.40 $ 206.69 $181.68 $ 176.40 A‐3 Assembly, churches $286.90 $276.49 $269.47 $258.42 $242.23 $234.07 $ 249.86 $223.05 $ 215.26 A‐3 Assembly, general, community halls, libraries,
museums $244.77 $234.37 $226.34 $216.29 $198.94 $191.79 $ 207.73 $179.77 $ 172.98 A‐4 Assembly, arenas $281.85 $271.45 $263.42 $253.37 $235.77 $228.61 $ 244.81 $216.59 $ 209.80 B Business $240.90 $232.07 $223.51 $214.08 $194.91 $187.36 $ 205.68 $172.02 $ 164.34 E Educational $257.70 $248.89 $242.35 $231.90 $216.47 $205.54 $ 223.92 $189.21 $ 183.31 F‐1 Factory and industrial, moderate hazard $144.93 $138.11 $130.39 $125.40 $112.49 $107.10 $ 120.02 $ 92.69 $ 86.88 F‐2 Factory and industrial, low hazard $143.93 $137.11 $130.39 $124.40 $112.49 $106.10 $ 119.02 $ 92.69 $ 85.88 H‐1 High Hazard, explosives $135.29 $128.47 $121.75 $115.76 $104.14 $ 97.75 $ 110.39 $ 84.34 N.P.

H234 High Hazard $135.29 $128.47 $121.75 $115.76 $104.14 $ 97.75 $ 110.39 $ 84.34 $ 77.53 H‐5 HPM $240.90 $232.07 $223.51 $214.08 $194.91 $187.36 $ 205.68 $172.02 $ 164.34 I‐1 Institutional, supervised environment $244.45 $236.08 $229.06 $219.82 $202.16 $196.58 $ 220.10 $181.25 $ 175.81 I‐2 Institutional, hospitals $401.22 $392.40 $383.83 $374.40 $354.29 N.P. $ 366.00 $331.40 N.P.

I‐2 Institutional, nursing homes $279.15 $270.32 $261.76 $252.33 $234.64 N.P. $ 243.93 $211.75 N.P.

I‐3 Institutional, restrained $273.40 $264.57 $256.00 $246.57 $229.13 $220.58 $ 238.17 $206.24 $ 196.56 I‐4 Institutional, day care facilities $244.45 $236.08 $229.06 $219.82 $202.16 $196.58 $ 220.10 $181.25 $ 175.81 M Mercantile $177.02 $169.94 $163.27 $155.07 $142.48 $137.88 $ 147.40 $123.17 $ 117.89 R‐1 Residential, hotels $246.94 $238.56 $231.54 $222.30 $204.35 $198.77 $ 222.58 $183.44 $ 178.00 R‐2 Residential, multiple family $206.81 $198.43 $191.41 $182.17 $165.41 $159.83 $ 182.46 $144.50 $ 139.06 R‐3 Residential, one‐ and two‐familyd
$192.58 $187.37 $182.53 $178.04 $172.85 $166.59 $ 175.01 $160.35 $ 150.87 R‐4 Residential, care/assisted living facilities $244.45 $236.08 $229.06 $219.82 $202.16 $196.58 $ 220.10 $181.25 $ 175.81 S‐1 Storage, moderate hazard $134.29 $127.47 $119.75 $114.76 $102.14 $ 96.75 $ 109.39 $ 82.34 $ 76.53 S‐2 Storage, low hazard $133.29 $126.47 $119.75 $113.76 $102.14 $ 95.75 $ 108.39 $ 82.34 $ 75.53 U Utility, miscellaneous $104.98 $ 99.04 $ 93.31 $ 89.21 $ 80.44 $ 74.45 $ 85.33 $ 63.42 $ 60.43 b. For Shell only building deduct 20 percent
c. N.P. = not permitted
d. Unfinished basements (Group R-3) = $23.20 per sq. ft.

Community Development
Building Fees
Building Valuation Schedule
Calculation - Schedule A
a. Private Garages use Utility, miscellaneous
1 2024/25 Cost Allocation Plan and Schedule of City Fees Page 452 of 573 Fee
Valuation Per Square Foot
U PATIO STRUCTURES/STORAGE SHEDS $35.00
DECKS $30.00
FENCES:

Wood lin. ft. Fee or Contract Price $20.00
Masonry or concrete lin. ft. Fee or Contract Price $35.00 Retaining walls lin. ft. Fee or Contract Price $30.00
TENANT IMPROVEMENTS sq. ft. Fee or Contract Price $35.37 RESIDENTIAL ALTERATIONS sq. ft. Fee or Contract Price
MANUFACTURED OR MOBILE HOME SETUP 1/3 of the R‐3 (VB) Valuation INTERIOR PARTITIONS:

Wall not exceeding 8 ft. in height lin. ft. Fee or Contract Price $55.00 Wall exceeding 8 ft. in height lin. ft. Fee or Contract Price $70.00 Drop ceiling sq. ft. Fee or Contract Price $5.00
SWIMMING POOLS:

In‐ground swimming pool (per pool) $65,000.00
In‐ground spa only (per spa) $30,000.00

Type of Building
Community Development
Building Fees
Building Valuation Schedule
Calculation - Schedule A
Fee Description
2 2024/25 Cost Allocation Plan and Schedule of City Fees Page 453 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
BUILDING PERMIT FEES: Fees based on Valuation and Rate Schedule For issuing each permit ‐ for permits not based on the Building Permit Fee Rate Schedule $115.84 $0 ‐ $8,000 Valuation $85.00
$8,001 ‐ $50,000 Valuation $170.00
$50,001 ‐ $1,000,000 Valuation
$440 + $2.28 per $10,000 of Total
Project Valuation
$1,000,001 + Valuation
$668 + $11.32 per $100,000 of
Total Project Valuation
For issuing each supplemental permit $20.69
PLAN REVIEW:

Standard Plan Check 65% of permit fee
Master Plan Check Program
Single ‐ Family:

For models and custom homes 65% of permit fee
For production homes 25% of permit fee
Multi ‐Family:

For initial review 65% of permit fee
For each building permit issuance 25% of permit fee
Energy Plan Check ‐ per building $130.42
OFFICE AUTOMATION - PER PERMIT: $4.02
or 1% of the Building Permit Fee, whichever is greater
DEMOLITION PERMIT: 1 hour1
REROOF:

Commercial ‐ Fee based on Valuation and Rate Schedule
Residential 1 hour1
WINDOW REPLACEMENT:
1 ‐ 10 windows 1 hour1
11+ windows 1 1/2 hours1
MANUFACTURED HOMES:

For manufactured or mobile home setup $2,391.54
1 To be charged at the Building Inspector II total hourly rate, Step E, per the Cost Allocation Plan Calculation - Schedule A-1
Fee Description
Community Development
Building Fees
Miscellaneous and Flat Fee Schedule
3 2024/25 Cost Allocation Plan and Schedule of City Fees Page 454 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Calculation - Schedule A-1
Fee Description
Community Development
Building Fees
Miscellaneous and Flat Fee Schedule
APPLICATION AND INSPECTION FEES:

POOLS/SPAS/OUTDOOR KITCHENS:

Swimming pool, including Electrical and Plumbing ‐ per gunite or fiberglass pool Based on Valuation Swimming pool deposit $1,500.00
Liner Type, including Electrical and Plumbing ‐ per in ground pool $563.83 Above Ground, including Electrical and Plumbing ‐ no plan check fee ‐ per pool $465.76 Outdoor BBQ with Kitchen ‐ no plan check fee ‐ per unit $327.45 Self Contained Spa or Above Ground Doughboy Style Pool Only requires electrical permit Bathroom Remodel $840.00
Kitchen Remodel $910.00

OTHER INSPECTIONS AND FEES:2
Inspections outside of normal business hours ‐ Minimum charge ‐ 2 hours to be charged at 1 1/2 times for after hours, overtime and weekends, and 2 times for Holidays Hourly Rate21 Re‐inspection ‐ Minimum charge ‐ 1/2 hour Hourly Rate21 Inspections for which no fee is specifically indicated ‐ Minimum charge ‐ 1/2 hour Hourly Rate21 Certified Access Specialist Program (CASP) Consultant Hourly Rate21 Additional plan review required by changes, additions or revisions to approved plans Minimum charge ‐ 1/2 hour Hourly Rate21
REISSUANCE FEE:

Reissuance of expired permits Reissued at the sole discretion of the Building Official 1/2 of the fee in effect at the time
of reissuance
COMPLETION FEE:

Completion of a project that is more than 50% complete. Work to be performed by third party not associated with the original permit. Issued at the sole discretion of the Building Official
1/2 of the fee in effect at the time
of issuance
Work without a permit (plus all original issuance, permit and plan check fees) 2 x original building fee amount 1 To be charged at the Building Inspector II total hourly rate, Step E, per the Cost Allocation Plan 2 Total hourly cost to the City of Brentwood. The cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved 4 2024/25 Cost Allocation Plan and Schedule of City Fees Page 455 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
PERMIT ISSUANCE:

For issuing each permit ‐ for permits not based on the Building Permit Fee Rate Schedule $115.84 $0 ‐ $8,000 Valuation $85.00
$8,001 ‐ $50,000 Valuation $170.00
$50,001 ‐ $1,000,000 Valuation
$440 + $2.28 per $10,000 of
Total Project Valuation
$1,000,001 + Valuation
$668 + $11.32 per $100,000 of
Total Project Valuation
For issuing each supplemental permit $20.69
PLAN REVIEW 65% of the total permit fee
OFFICE AUTOMATION - PER PERMIT: $4.02
or 1% of the Electrical Permit Fee, whichever is greater SYSTEM FEE SCHEDULE:

NEW BUILDINGS:

The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time except swimming pools.

New residential, non‐residential buildings ‐ per sq. ft. $0.0713 ALTERATIONS AND ADDITIONS:

Alterations, additions and modifications to existing buildings <500 sq. ft.1$0.1996
>500 and < 1,000 sq. ft.1$0.1622
The following fees will be charged in addition to the permit issuance fee:

Stand-alone Electrical Permits:
$0 ‐ $2,000 Valuation $150.00 flat
$2,000.01 ‐ $5,000 Valuation $210.00 flat
$5,000.01 ‐ $10,000 Valuation $300.00 flat
$10,000.01 + Valuation $400.00 flat
Miscellaneous Electrical Item/Fixture Permits: 70.00 flat New Construction, Addition, Alteration Permits: 20% of the building permit fee SPA:

Self Contained Spa ‐ per spa21/2 Hour
Other types of swimming pools, therapeutic whirlpools, spas and alterations to existing swimming pools Use Unit Fee Schedule
CARNIVALS AND CIRCUSES:

Community Development
Building Fees
Electrical Permit Fees
Fee Description
Calculation - Schedule B
5 2024/25 Cost Allocation Plan and Schedule of City Fees Page 456 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Community Development
Building Fees
Electrical Permit Fees
Fee Description
Calculation - Schedule B
Carnivals, circuses and other traveling shows or exhibitions utilizing transportable type rides, booths, displays and attractions
Electric generators and electrically driven rides $30.8300 Mechanically driven rides and walk‐through attractions or displays having electrical lighting $9.2300 Permanently installed rides, booths, displays and attractions Use Unit Fee Schedule TEMPORARY POWER SERVICE:

Temporary service power pole or pedestal, including all pole or pedestal‐mounted receptacle outlets & appurtenances $30.83
COMBINATION ELECTRICAL, PLUMBING and MECHANICAL
Single Issuance
Fee is Charged
1 Option to Use Unit Fee Schedule
2 To be charged at the Building Inspector II total hourly rate, Step E, per the Cost Allocation Plan 6 2024/25 Cost Allocation Plan and Schedule of City Fees Page 457 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Community Development
Building Fees
Electrical Permit Fees
Fee Description
Calculation - Schedule B
The following fees will be charged in addition to the permit issuance fee:

UNIT FEE SCHEDULE:

RECEPTACLE, SWITCH AND LIGHTING OUTLETS:

Receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders and meters:

First 20 ‐ each $1.4900
Additional fixtures ‐ each $0.8700
For multi-outlet assemblies, each 5 ft. or fraction thereof may be considered as one outlet LIGHTING FIXTURES:

Lighting fixtures, sockets or other lamp‐holding devices:

First 20 ‐ each $1.4900
Additional fixtures ‐ each $0.8900
Pole or platform‐mounted lighting fixtures ‐ each $1.4300 Theatrical‐type lighting fixtures or assemblies ‐ each $6.1300 RESIDENTIAL APPLIANCES - each:

Fixed residential appliances or receptacle outlets for same, including wall‐mounted electric ovens, counter‐mounted cooking tops, electric ranges, self‐contained room, console, or through‐wall air conditioners, space heaters, food waste grinders, dishwashers, washing machines, water heaters, clothes dryers, or other motor‐operated appliances not exceeding one horsepower ("HP") in rating $6.13
For other types of air conditioners and other electrical ratings See POWER APPARATUS Section NON-RESIDENTIAL APPLIANCES - each:

Self‐contained factory‐wired, non‐residential appliances not exceeding one horsepower ("HP"), kilowatt ("kWh"), or kilovolt‐ampere ("KVA"), in rating, including medical and dental devices, food, beverage and ice cream cabinets, illuminated show cases, drinking fountains, vending machines, laundry machines, or similar types of equipment $6.13 For other types of air conditioners and other motor‐driven appliances having larger electrical ratings See POWER APPARATUS Section
7 2024/25 Cost Allocation Plan and Schedule of City Fees Page 458 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Community Development
Building Fees
Electrical Permit Fees
Fee Description
Calculation - Schedule B
The following fees will be charged in addition to the permit issuance fee:

POWER APPARATUS:1,2
Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners, and heat pumps, cooking or baking equipment and other apparatus, as follows:

Rating in horsepower ("HP"), kilowatt ("kWh"), kilovolt‐ampere ("KVA"), or kilovolt‐ampere ("KVAR"):

Up to and including 1 $6.13
Over 1 and not over 10 $15.40
Over 10 and not over 50 $30.81
Over 50 and not over 100 $61.67
Over 100 $92.50
ENERGY STORAGE SYSTEMS (ESS):

Residential ESS 1/2 hour1
First Battery $200.00
Each Additional Battery $15.00
Commercial ESS Cost of Building Permit
BUSWAYS:

Trolley and plug‐in‐type busway ‐ per 100 ft.3
$9.19
SIGNS, OUTLINE LIGHTING AND MARQUEES - each:

Signs, outline lighting systems or marquees supplied from one branch circuit $30.83 Additional branch circuits within the sign, outline lighting system or marquee $6.13 SERVICES - each:

Services of 600 volts or less and not over 200 amperes in rating $38.00 Services of 600 volts or less and over 200 amperes to 1000 amperes in rating $77.10 Services over 600 volts or over 1000 amperes in rating $154.19 MISCELLANEOUS APPARATUS, CONDUITS AND CONDUCTORS - each:

Electrical apparatus, conduits and conductors for which a permit is required but for which no fees herein set forth4$22.61
4 This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment 1 For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used 2 These fees include all switches, circuit breakers, contactors, thermostats, relays and other directly related control equipment 3 An additional fee will be required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in-type busways. No fee is required for portable tools
8 2024/25 Cost Allocation Plan and Schedule of City Fees Page 459 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Community Development
Building Fees
Electrical Permit Fees
Fee Description
Calculation - Schedule B
PHOTOVOLTAIC SYSTEM:

Single‐Family residential photovoltaic system less than 15 kWh $440.00 Single‐Family residential photovoltaic system 15 kWh or greater $440 + $15/kWh > 15 Commercial or multi‐family residential photovoltaic system up to 50 kWh $975.00 Commercial or multi‐family residential photovoltaic system between 50.1 kWh and 250 kWh $975 + $7/kWh > 50 Commercial or multi‐family residential photovoltaic system above 250 kWh $2,375 + $5/kWh > 250 Plan check (applies to commercial and multi‐family) 65% of permit fee OTHER INSPECTIONS AND FEES:1
Inspections outside of normal business hours ‐ Minimum charge ‐ 2 hours to be charged at 1 1/2 times for after hours, overtime and weekends, and 2 times for Holidays Hourly Rate21 Re‐inspection ‐ Minimum charge ‐ 1/2 hour Hourly Rate
21 Inspections for which no fee is specifically indicated ‐ Minimum charge ‐ 1/2 hour Hourly Rate21 Additional plan review required by changes, additions or revisions to approved plans Minimum charge ‐ 1/2 hour Hourly Rate21
Work without a permit (plus all original issuance, permit and plan check fees) 2 x original building fee amount 1 Total hourly cost to the City of Brentwood. The cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved 2 1
To be charged at the Building Inspector II total hourly rate, Step E, per the Cost Allocation Plan Note: For Planned Event/Response/Clean-Up Fees/Services refer to the Citywide Fees page 9 2024/25 Cost Allocation Plan and Schedule of City Fees Page 460 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
PERMIT ISSUANCE:

For issuing each permit ‐ for permits not based on the Building Permit Fee Rate Schedule $115.84 $0 ‐ $8,000 Valuation $85.00
$8,001 ‐ $50,000 Valuation $170.00
$50,001 ‐ $1,000,000 Valuation
$440 + $2.28 per $10,000 of
Total Project Valuation
$1,000,001 + Valuation
$668 + $11.32 per $100,000
of Total Project Valuation
For issuing each supplemental permit $20.69

PLAN REVIEW 65% of the total permit fee
OFFICE AUTOMATION - PER PERMIT:
or 1% of the Plumbing Permit Fee, whichever is greater $4.02 SYSTEM FEE SCHEDULE:

NEW BUILDINGS:

Residential, non‐residential buildings ‐ per sq. ft. $0.0713 The following fees will be charged in addition to the permit issuance fee:

Stand-alone Plumbing Permits:
$0 ‐ $2,000 Valuation $150.00 flat
$2,000.01 ‐ $5,000 Valuation $210.00 flat
$5,000.01 ‐ $10,000 Valuation $300.00 flat
$10,000.01 + Valuation $400.00 flat
Miscellaneous Plumbing Item/Fixture Permits: 70.00 flat New Construction, Additions, Alterations: 20% of building permit fee SWIMMING POOLS:

Swimming Pool or Spa ‐ each $92.50
The following fees will be charged in addition to the permit issuance fee:

UNIT FEE SCHEDULE:

For each plumbing fixture on one trap or a set of fixtures on one trap ‐ including water, drainage piping and backflow protection device therefore $14.38 For each building sewer and each trailer park sewer $30.83 Rainwater systems ‐ each drain inside building $14.42
For each cesspool ‐ where permitted $51.39
For each private sewage disposal system $82.24
For each water heater and/or vent $14.42
For each gas‐piping system:

Calculation - Schedule C
Fee Description
Community Development
Building Fees
Plumbing Permit Fees
10 2024/25 Cost Allocation Plan and Schedule of City Fees Page 461 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Calculation - Schedule C
Fee Description
Community Development
Building Fees
Plumbing Permit Fees
1 to 5 systems ‐ per system $10.29
over 5 systems ‐ per system $2.06
For each industrial waste pre‐treatment interceptor including its trap and vent, except kitchen‐type grease interceptors functioning as fixture traps $14.42 For each installation, alteration or repair of water piping and/or water treating equipment $14.42 For each repair or alteration of drainage or vent piping ‐ each fixture $14.42 For each lawn sprinkler system on any one meter including backflow protection devices $14.42 11 2024/25 Cost Allocation Plan and Schedule of City Fees Page 462 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Calculation - Schedule C
Fee Description
Community Development
Building Fees
Plumbing Permit Fees
UNIT FEE SCHEDULE (continued):

For atmospheric‐type vacuum breakers:
1 to 5 breakers ‐ each $10.29
6 or more breakers ‐ each $2.06
For each backflow protective device other than atmospheric type vacuum breakers:
2 inch diameter and smaller ‐ each $14.42
over 2 inch diameter ‐ each $30.83
Water Softener and/or Reverse Osmosis system installation ‐ each $14.42 OTHER INSPECTIONS AND FEES:1
Inspections outside of normal business hours ‐ Minimum charge ‐ 2 hours to be charged at 1 1/2 times for after hours, overtime and weekends, and 2 times for Holidays Hourly Rate21 Re‐inspection ‐ Minimum charge ‐ 1/2 hour Hourly Rate21 Inspections for which no fee is specifically indicated ‐ Minimum charge ‐ 1/2 hour Hourly Rate21 Additional plan review required by changes, additions or revisions to approved plans Minimum charge ‐ 1/2 hour Hourly Rate21
Work without a permit (plus all original issuance, permit and plan check fees) 2 x original building fee amount COMBINATION ELECTRICAL, PLUMBING and MECHANICAL
Single Issuance Fee is
Charged
1 Total hourly cost to the City of Brentwood. The cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees 2 1
To be charged at the Building Inspector II total hourly rate, Step E, per the Cost Allocation Plan The following fees will be charged in addition to the permit issuance fee:
12 2024/25 Cost Allocation Plan and Schedule of City Fees unt

Page 463 of 573 ends

Fee +3% Surcharge Added if
Paying by Credit Card
PERMIT ISSUANCE:

For issuing each permit ‐ for permits not based on the Building Permit Fee Rate Schedule $115.84 $0 ‐ $8,000 Valuation $85.00
$8,001 ‐ $50,000 Valuation $170.00
$50,001 ‐ $1,000,000 Valuation
$440 + $2.28 per $10,000 of
Total Project Valuation
$1,000,001 + Valuation
$668 + $11.32 per $100,000 of
Total Project Valuation
For issuing each supplemental permit $20.69

Plan Review 65% of the total permit fee
Office Automation - Per Permit
or 1% of the Mechanical Permit Fee, whichever is greater $4.02 NEW BUILDINGS:

New residential, non‐residential buildings ‐ per sq. ft. $0.0713 The following fees will be charged in addition to the permit issuance fee:

Stand-alone Mechanical Permits:
$0 ‐ $2,000 Valuation $150.00 each
$2,000.01 ‐ $5,000 Valuation $210.00 flat
$5,000.01 ‐ $10,000 Valuation $300.00 flat
$10,000.01 + Valuation $400.00 flat
Miscellaneous Mechanical Item/Fixture Permits: 70.00 flat New Construction, Additions, Alterations: 20% of the building permit fee UNIT FEE SCHEDULE:

For the installation or relocation of each forced‐air or gravity‐type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 British Thermal Units per hour ("Btu/h") $18.49
For the installation or relocation of each forced‐air or gravity‐type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h $22.61 For the installation or relocation of each floor furnace, including vent $18.49 For the installation or relocation of each suspended heater, recessed wall heater or floor‐ mounted unit heater $18.49
For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit $9.25
For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code $18.49 Calculation Schedule D
Fee Description
Community Development
Building Fees
Mechanical Permit Fees
13 2024/25 Cost Allocation Plan and Schedule of City Fees Page 464 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Calculation Schedule D
Fee Description
Community Development
Building Fees
Mechanical Permit Fees
For the installation or relocation of each boiler or compressor to and including three horsepower ("HP"), or each absorption system to and including 100,000 Btu/h $18.49 For the installation or relocation of each boiler or compressor over three HP to and including 15 HP or each absorption system over 100,000 Btu/h and including 500,000 Btu/h $33.89 For the installation or relocation of each boiler or compressor over 15 HP to and including 30 HP or each absorption system over 500,000 Btu/h and including 1,000,000 Btu/h $46.29 For the installation or relocation of each boiler or compressor over 30 HP to and including 50 HP or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h $68.88 14 2024/25 Cost Allocation Plan and Schedule of City Fees Page 465 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Calculation Schedule D
Fee Description
Community Development
Building Fees
Mechanical Permit Fees
The following fees will be charged in addition to the permit issuance fee:

UNIT FEE SCHEDULE (continued):

For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h $115.15 For each air‐handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto1$13.55
For each air‐handling unit over 10,000 cubic feet per minute ("CFM") $22.61 For each evaporative cooler other than portable type $13.39 For each ventilation fan connected to a single duct $9.25 For each ventilation system which is not a portion of any heating or air‐conditioning system authorized by a permit $13.39
For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood $13.39
For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code $13.39 Permit fees for fuel gas piping shall be:

For each fuel gas piping system of one to four outlets $10.29 For each fuel gas piping system of five or more outlets, per outlet $2.06 Permit fees for process piping shall be:

For each process piping system of one to four outlets $10.29 For each process piping system of five or more outlets, per outlet $2.06 1 This fee shall not apply to an air-handling unit which is a portion of a factory-assembled appliance, boiling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code
15 2024/25 Cost Allocation Plan and Schedule of City Fees Page 466 of 573 Fee +3% Surcharge Added if
Paying by Credit Card
Calculation Schedule D
Fee Description
Community Development
Building Fees
Mechanical Permit Fees
The following fees will be charged in addition to the permit issuance fee:

OTHER INSPECTIONS AND FEES:1
Inspections outside of normal business hours ‐ Minimum charge ‐ 2 hours Hourly Rate21 Above rate to be charged at 1 1/2 times for after hours, overtime and weekends, and 2 times for Holidays Re‐inspection ‐ Minimum charge ‐ 1/2 hour Hourly Rate21 Inspections for which no fee is specifically indicated ‐ Minimum charge ‐ 1/2 hour Hourly Rate21 Additional plan review required by changes, additions or revisions to approved plans Minimum charge ‐ 1/2 hour Hourly Rate21
Work without a permit (plus all original issuance, permit and plan check fees) 2 x original building fee amount

COMBINATION ELECTRICAL, PLUMBING AND MECHANICAL
Single Issuance Fee
is Charged
1 Total hourly cost to the City of Brentwood. The cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees 2 1
To be charged at the Building Inspector II total hourly rate, Step E, per the Cost Allocation Plan 16 2024/25 Cost Allocation Plan and Schedule of City Fees Page 467 of 573 Low High Base Fee
$0.00 $500.00 $104.66 N/A
Low High Base Fee per $100
$500.00 $2,000.00 $104.66 $5.71
Low High Base Fee per $1,000
$2,000.00 $25,000.00 $190.43 $25.77
$25,000.00 $50,000.00 $783.29 $18.63
$138,728 per low income unit not built * $50,000.00 $100,000.00 $1,249.06 $12.92 $203,841 per very low income unit not built $100,000.00 $500,000.00 $1,895.40 $10.05 $500,000.00 $1,000,000.00 $5,914.67 $8.41
$1,000,000.00 $99,999,999.00 $10,117.32 $5.62
Low High Base Fee
$0.00 $2,000.00 $210.00 N/A
$2,001.00 $25,000.00 $210.00 $34.87
$25,001.00 $100,000.00 $1,013.00 $19.32
$100,001.00 $1,000,000.00 $2,462.00 $10.64
$1,000,000.00 $99,999,999.00 $12,040.00 $5.62
Range Increment
Community Development
Building Fees
Building Permit Fee
Rate Schedule
Valuation Fee +3% Surcharge Added if Paying by Credit Card Valuation Fee +3% Surcharge Added if Paying by Credit Card Range Increment
2024/25 Cost Allocation Plan and Schedule of City Fees Page 468 of 573 Fee Description Fee1
+3% Surcharge Added if
Paying by Credit Card
Residential and Non‐Residential Permits $1.00 per $25,000 valuation Administrative Cost for Code Enforcement Education 10% of fee 1 Fees are established by SB1473
Fee Description Fee2
+3% Surcharge Added if
Paying by Credit Card
SMI for Residential Permits $0.00013 x permit valuation SMI for Non‐Residential Permits $0.00028 x permit valuation Building Permit $0.50 minimum charge
Administrative Cost for Seismic Education 5% of fee
2 Fees are established by SB593
California Strong Motion Instrumentation (SMI) Program
Community Development
Building Permit Surcharge Fees
Building Standards Commission Revolving Fund
18 2024/25 Cost Allocation Plan and Schedule of City Fees Page 469 of 573 Fee +3% Surcharge Added if
Paying by Credit Card

1. Annexations Actual Cost
Deposit $5,800.00

2. General/Specific Plan Amendment Actual Cost
Deposit $5,800.00

3. Rezoning/Zoning Ordinance Amendment
Deposit $4,900.00
Maps $9,880.00
Text $9,880.00
Map and Text $14,560.00

4. Design Review
Residential ‐ Less than 5 Units Actual Cost
Deposit $500.00/per unit up to $2,000.00
Residential and Non‐Residential ‐ 5 or More Units Actual Cost Deposit $6,600.00
Administrative DTSP Residential $3,250.00
Administrative Other $320.00
Residential: 1 Unit $5,200.00
Residential: 2‐9 Units $7,810.00
Residential: 10‐50 Units $15,040.00
Residential: 51‐100 Units $19,670.00
Residential: 101+ Units $25,270.00
Commercial up to 10,000 sf $13,560.00
Each additional 5,000 sf above 10,000 $970.00

5. Conditional Use Permit
Residential Actual Cost
Deposit $500.00/per unit up to $2,000.00
Non‐Residential Actual Cost
Deposit $2,200.00
Daycare ‐ Single‐Family Residence $292.00
Existing Structure $5,850.00
New Structure $10,090.00

6. Tentative Maps Actual Cost
Deposit $6,000.00
Tentative Parcel Map Waiver $3,580.00 $3,546.00
Parcel Map $3,580.00
Tract Map 5‐50 Lots
Base Fee $6,510.00
Per lot over 5 $200.00
Tract Map 51‐100 Lots
Base Fee $15,620.00
Per lot over 51 $100.00
Tract Map 101+ Lots $20,830.00
Base Fee $20,830.00
Per lot over 101 $50.00

7. Variance Actual Cost
Deposit Planning Commission $7,810.00
Admin Variance $1,950.00 $1,143.00

8. Sign Permit/Review
Administrative $320.00 $366.00
Master Sign Program Actual Cost
Master Sign Program ‐ Deposit $2,600.00
Community Development
Planning Fees
Fee Description
19 2024/25 Cost Allocation Plan and Schedule of City Fees Page 470 of 573 Community Development
Planning Fees
Planning Commission Approval Permit Actual Cost
Sign Permit/Review ‐ Planning Commission Approval Permit ‐ Deposit $3,250.00 $900.00 Temporary Permit for Signs and Banners $25.00 No Charge Actual Cost: Contractor costs and/or labor cost for City Staff total hourly rate at Step E per the Cost Allocation Plan time provided by a service

Note: The timing of the payment of fees is determined by the City Manager in consultation with the Director of Finance and Information Systems and the Director of Community Development
20 2024/25 Cost Allocation Plan and Schedule of City Fees Page 471 of 573 Community Development
Planning Fees
Fee +3% Surcharge Added if
Paying by Credit Card

9. Environmental Review
Environmental Impact Report ‐ Prepared by Consultant Consultant Cost + 25% for City Admin Negative Declaration ‐ Prepared by Staff Actual Cost
Deposit $3,500.00
Mitigated Negative Declaration ‐ Prepared by Staff Actual Cost Deposit $4,900.00
Mitigated Negative Declaration ‐ Prepared by Consultant Actual Cost + 25% for City Admin Deposit Actual Cost + 25% for City Admin

10. Administrative Oil Permit Actual Cost
Deposit $2,500.00

11. Development Agreement Actual Cost
Deposit $4,200.00

12. Affordable Housing - Legal review or consulting Actual Cost + 25% for City Admin Deposit Actual Cost + 25% for City Admin

13. Appeals $2,920.00 $441.00

14. Categorical Exemption $650.00 $242.00

15. Temporary Use Permit ("TUP")
Minor TUP $70.00
Universal TUP Staff Level $1,300.00 $1,019.00
Minor TUP Planning Commission $3,900.00 $76.00

16. Amendments Actual Cost
Deposit $2,200.00
Amendment ‐ 6409 $970.00
Amendment ‐ Other 75% of current fee

17. Time Extensions $3,580.00 $1,668.00

18. General Plan Maintenance Fee
Per dwelling unit or non‐residential per 2,500 sq. ft. $409.00 Fee Description
Actual Cost: Contractor costs and/or labor cost for City Staff (total hourly rate at Step E per the Cost Allocation Plan) time provided for a service Note: The timing of the payment of fees is determined by the City Manager in consultation with the Director of Finance and Information Systems and the Director of Community Development.
21 2024/25 Cost Allocation Plan and Schedule of City Fees Page 472 of 573 Community Development
Planning Fees
Fee +3% Surcharge Added if
Paying by Credit Card

19. Agricultural Mitigation Fee - per acre1
$9,183.00

20. County Environmental Filing Fees2 Actual Cost

21. Residential Street Addressing
Subdivisions $242.00
Secondary Units $62.88
1 Unit $320.00
2‐9 Units $650.00
10‐50 units $970.00
51‐100 Units $1,300.00
101+ Units $1,620.00
Secondary Units $160.00

22. Peer Review - Legal, Consultant Actual Cost + 25% for City Admin

23. Special Studies - Traffic, Environmental, etc. Actual Cost + 25% for City Admin

24. Adult Oriented Zoning Review $5,831.00

25. Residential Condominium Conversion $5,850.00 Actual Cost Deposit $2,200.00

26. Preliminary Application Review No Charge
SB 330 $1,950.00
All Others $1,300.00

27. Outdoor Dining/Merchandise Display Review No Charge

28. Home Occupation Zoning Review $50.00

29. Archival Fee $220.00
(No charge if provided in acceptable electronic format)

30. Landscape Review - Private Landscaping
Plan Check and Inspection Fee ‐ by Staff Actual Cost
Plan Check ‐ by Consultant Actual Cost + 25% for City Admin Deposit $3,000.00

31. Consultant Planning Services Actual Cost + 25% for City Admin

32. AB 2011 Review $7,320.00

33. Planning Review of Building Permit $240.00

34. Density Bonus $5,200.00

35. Wireless Facilities
Administrative Permit 6409 $1,620.00
Conditional Permit $10,090.00
Accessory Small Cell $1,620.00
1 Fee Set by BMC 17.730/Ord. 877 and Reso. 2354 adopted August 28, 2001 2 Contra Costa County Clerk Filing Fees
Fee Description
22 2024/25 Cost Allocation Plan and Schedule of City Fees Page 473 of 573 Community Development
Planning Fees
Actual Cost: Contractor costs and/or labor cost for City Staff (total hourly rate at Step E per the Cost Allocation Plan) time provided for a service Note: The timing of the payment of fees is determined by the City Manager in consultation with the Director of Finance and Information Systems and the Director of Community Development
23 2024/25 Cost Allocation Plan and Schedule of City Fees Page 474 of 573 CITY COUNCIL AGENDA ITEM NO. H.1
11/12/2024
SUBJECT: Focused Zoning Code Update Direction: Self-storage facilities DEPARTMENT: Community Development
STAFF: Alexis Morris, Director of Community Development Erik Nolthenius, Planning Manager
Jennifer Hagen, Senior Planner

TITLE/RECOMMENDATION
Provide direction to staff on potential new regulations within the framework of the Focused Zoning Code Update related to self-storage facilities.

FISCAL IMPACT
The cost of the update is included in the Zoning Ordinance Focused Update, CIP Project No. 337-37228, (“Project”) which is included in the adopted and amended 2024/25 – 2028/29 Capital Improvement Program. The majority of the Project is funded by the General Fund, with a minor amount from SB 2 grant funding.

BACKGROUND
On January 24, 2023, the City Council provided direction on reinitiating the City’s Zoning Code Update, including a new focused and phased approach. On May 23, 2023, the project scope was finalized when the City Council approved a Professional Services Agreement with De Novo Planning Group to prepare and complete the Focused Zoning Code Update and Objective Design Standards. The plan approved by the Council includes three main tasks to complete:

Task 1: Objective Design Standards;
Task 2: Zoning Code Updates required by State Law and the Housing Element; Task 3: Focused Zoning Code updates.

This agenda item is related to Task 3: Focused Zoning Code updates. This task includes amendments to various sections of the Zoning Code to better reflect the community's values based on feedback from the community and City Council, including changes to some permitted and conditionally permitted uses throughout the City.

Page 475 of 573 ends
← All documents from this meeting