-1-
City of Brisbane
City Council Meeting Agenda
Thursday, April 2, 2026 at 6:30 PM ● Hybrid Meeting ● 50 Park Place, Brisbane, CA The public may observe/participate in City Council meetings using remote public comment options or by attending in person. The City Council may take action on any item listed in the agenda.
To Address the Council
In Person:
Location: Community Meeting Room 50 Park Place, Brisbane, CA 94005 To address the City Council on any item – whether on the posted agenda or not – please fill out a Request to Speak Form located in the Community Meeting Room Lobby and submit it to the City Clerk, preferably before the start of the meeting. Speakers are not required to submit their name or address.
Remote Participation:
Members of the public may observe/participate in the City Council meeting by logging into the Zoom Webinar listed below. City Council meetings may also be viewed live and/or on-demand via the City’s YouTube Channel, youtube.com/brisbaneca, or on Comcast Ch. 27. Archived videos may be replayed on the City’s website, brisbaneca.org/meetings. Please be advised that if there are technological difficulties, the meeting will nevertheless continue if remote participation is available.
The agenda materials may be viewed online at brisbaneca.org at least 72 hours prior to a Regular Meeting, and at least 24 hours prior to a Special Meeting.
Remote Public Comments:
Remote meeting participants may address the City Council via Zoom Webinar. Aside from commenting personally while in the Zoom Webinar, you can also use the call in number. The public comments received will be noted for the record during Oral Communications 1 and 2 or during an agenda item. We encourage you to email comments in advance of the meeting to [email protected]. That email address, however, will not be monitored during the meeting and emails received during the meeting will not be responded to or brought to the attention of the City Council during the meeting.
Join Zoom Webinar: zoom.us (please use the latest version: zoom.us/download) brisbaneca.org/cc-zoom
Webinar ID: 991 9362 8666
Call In Number: 1 (669) 900-9128
Note: Callers dial *9 to “raise hand” and dial *6 to mute/unmute.
Special Assistance:
If you need special assistance to participate in this meeting, please contact the City Clerk at (415) 508- 2113.
Notification in advance of the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting.
April 2, 2026 -2- 6:30 PM
Writings that Are Received After the Agenda Has Been Posted Any writings that are received after the agenda has been posted but before 4pm of the day of the meeting will be available for public inspection at the front lobby in City Hall and on the internet (brisbaneca.org/meetings).
Any writings that are received after 4pm of the day of the meeting will be distributed to the Council and made available for public inspection at the front lobby and on the internet the day after the meeting (brisbaneca.org/meetings).
Call to Order – Pledge of Allegiance
Roll Call
A. Remote Attendance Under the Just Cause Provisions of the Brown Act Adoption of Agenda
Oral Communications No. 1
Consent Calendar
B. Approve Minutes of City Council Meeting of March 5, 2026 C. Approve Minutes of City Council Closed Session Meeting of March 19, 2026 D. Accept Investment Report as of February 2026
E. Adopt Resolution Authorizing the Director of Public Works or the City Clerk to Accept and Consent to Deeds or Grants of Real Estate
F. Adopt Resolution Approving and Recertifying of the City of Brisbane's 2026 Sewer System Management Plan
G. Adopt Resolution to Amend the Current Deputy Public Works Director Job Description Old Business
H. Halloween Street Closure Event Review
New Business
I. Consider an Urgency Ordinance for a Moratorium on New Residential Development in the NCRO-2 District
J. Complete Streets Safety Committee 2025 Accomplishments & 2026 Work Plan K. Complete Streets Safety Committee Recommendations for Visitacion Avenue Corridor Safety and Operations
L. Consider Adoption of Fiscal Year 2026-2027 Council Priorities Staff Reports
April 2, 2026 -3- 6:30 PM
M. City Manager’s Report- City Updates and Upcoming Activities Mayor and Council Matters
N. Recruitment Update for Council Committees
O. Future Agenda Items
P. Countywide Assignments and Subcommittee Reports
1. Parkside 2 Ad Hoc Subcommittee Update
2. Report Out on Subcommittee Meetings
3. Upcoming Subcommittee Meetings
Q. Written Communications
Oral Communications No. 2
Adjournment
BRISBANE CITY COUNCIL
ACTION MINUTES
CITY COUNCIL MEETING AGENDA
THURSDAY, MARCH 5, 2026
HYBRID MEETING, 50 PARK PLACE, BRISBANE, CA 94005
6:30 P.M. CALL TO ORDER – PLEDGE OF ALLEGIANCE
Mayor Mackin called the meeting to order at 6:33 P.M. and led the Pledge of Allegiance.
ROLL CALL
A. Consider any request of a City Councilmember to attend the meeting remotely under the “Emergency Circumstances” of AB 2449
No requests were made under Roll Call Item A.
Councilmembers Present: Councilmembers Davis, Kern, Lentz, O’Connell and Mayor Mackin Councilmembers Absent: None
Staff Present: City Manager Dennis, City Clerk Padilla, City Attorney McMorrow, Finance Director Yuen, Parks and Recreation Director Leek, Acting Community Development Director Ayres, City Engineer Bozorginia, Human Resources Director Partin, Police Chief Macias, Police Commander Garcia, Admin Management Analyst Brown and Admin Management Analyst Ibarra
REPORT OUT OF CLOSED SESSION
City Attorney McMorrow reported out of the Closed Session Meeting of February 3, 2026. Council gave direction to staff regarding the Anticipated Litigation Item D. No action was taken.
ADOPTION OF AGENDA
Mayor Mackin reported there is a clerical error on Staff Report O. The date of the Priorities Study Session should be Saturday, March 21, 2026. Additionally, New Business Items M and Item N will be moved up in the agenda before the discussion of Old Business Item L.
Councilmember Lentz made a motion, seconded by Councilmember Kern, to adopt the agenda amended. The motion was carried unanimously by all present.
City Council Meeting Minutes
March 5, 2026
Ayes: Councilmembers Davis, Kern, Lentz, O’Connell and Mayor Mackin Noes: None
Absent: None
Abstain: None
AWARDS AND PRESENTATIONS
B. Receive Grants Presentation from California Grants Policy Group California Grants Policy Group’s Director of Grant Services, Jake Whitaker highlighted the grants awarded to the City. Mr. Whitaker also provided an update on upcoming grant requests and next steps. The Council thanked Mr. Whitaker for his presentation.
ORAL COMMUNICATIONS NO. 1
Cary Mossing and Lauren Dunford from San Mateo County Libraries invited the public to join the Free Adult English Group Classes being held in the Brisbane Library.
Chris Florkowski wanted to correct the information at the previous council meeting regarding the BART budget.
CONSENT CALENDAR
C. Proclaiming March 2026 as Women’s History Month
D. Approve Minutes of City Council Meeting of February 19, 2026 E. Approve Minutes of Closed Session City Council Meeting of February 19, 2026 F. Approve Minutes of Closed Session City Council Meeting of February 23, 2026 G. Accept Investment Report as of January 2026
I. Adopt Resolution to Amend the Current Financial Services Manager Job Description J. Adopt Amended Public Arts Implementation Guidelines Approving Revisions to the Membership of the Public Art Advisory Committee
Councilmember Davis made a motion, seconded by Councilmember Lentz, to approve Consent Calendar Items C-G and I and J. The motion was carried unanimously by all present.
Ayes: Councilmembers Davis, Kern, Lentz, O’Connell and Mayor Mackin Noes: None
Absent: None
Abstain: None
City Council Meeting Minutes
March 5, 2026
H. Approve Spring 2026 Co-sponsorship Events
Councilmember Davis recused herself from Consent Calendar Item H and left the room. Councilmember O’Connell made a motion, seconded by Councilmember Kern, to approve Consent Calendar Item H. The motion was carried unanimously by all present.
Ayes: Councilmembers Kern, Lentz, O’Connell and Mayor Mackin Noes: None
Recused: Councilmember Davis
Absent: None
Abstain: None
OLD BUSINESS
K. Request to Reconsider Utility Payment Requirements by Silverspot Nursery School City Manager Dennis reported that staff recommends that the Council consider Silverspot Nursery School’s request to reconsider its responsibility for water utility payments under the current lease agreement and provide direction to staff accordingly.
After Council questions, Jessica Farkas and Teacher Diana Ji asked the Council to reconsider the school’s utility payment requirements as Silverspot Nursery School is just getting back on their feet. Based on the information available at the time and prior consumption patterns, Silverspot anticipated an additional annual expense of approximately $500. However, discussions during the lease renewal period did not account for recent citywide rate increases affecting all water customers, nor for additional components reflected on utility bills, including water service fees, sewer charges, capital project assessments, and drought contingency fees. Silverspot has requested that the Council reconsider the requirement that it assume full responsibility for water utilities, noting that the projected annual cost is closer to $3,100 rather than the $500 initially anticipated.
After further Council discussion, Councilmember Lentz made a motion, seconded by Councilmember Davis, to waive the sewer portion of Silverspot Nursery School’s utility payment over the duration of their two-year lease (through July 31, 2027) and reimburse Silverspot Nursery School back of any sewer charges they have already paid to the City. The motion was carried unanimously by all present.
Ayes: Councilmembers Davis, Kern, Lentz, O’Connell and Mayor Mackin Noes: None
Absent: None
Abstain: None
Councilmembers also reminded staff they are looking forward to having a conversation and update from Silverspot Nursery School after the completion of the first year of the lease agreement or July 31st, 2026.
NEW BUSINESS
M. Receive Security Update on Flock Cameras
Over the past several months, there has been increased public discussion regarding the use of Automated
City Council Meeting Minutes
March 5, 2026
License Readers (ALPR) technology, particularly involving the vendor FLOCK Safety. Police Chief Macias and Police Commander Garcia provided a security update on Flock Cameras stating that the department remains committed to balancing public safety needs with privacy protection.
Police Commander Garcia also reported that ALPR cameras has proven to be a valuable investigative tool that has supported stolen vehicles recovery, notification, and crime reduction and their use must remain lawful, limited, transparent, and accountable.
After Council questions, Shelley Hodes asked a question about tracking vehicles that have no license plates.
Erin Becker commented that she liked the transparency of the ALPR Community Engagement Letter and she also recommended an external and independent audit of the ALPR program.
Councilmembers thanked the Polic Department for their update.
N. Pilot Program for Use of a Camera in the Community Park City Manager Dennis reported that the policy of the pilot program for use of a camera in the community park is before the Council.
After no council questions, Clint Cardoza asked council to support the program after he was a victim of a pitbull attack.
Linda Salmon, Michele Salmon, Steve, a resident, and Erin Becker encouraged the Council not to support the pilot program due to invasion of privacy concerns and concerns about government surveillance in a low crime safe community.
Anthony Dana shared his concerns about AI usage and who can access the data.
Linda Salmon, Fran, a resident, and Michele Salmon commented that this issue is more about enforcing rules for off-leash dogs.
Al Cardoza commented that his son was attacked by the pitbull and this is a proactive program where the City can monitor an area where police cannot be for 24 hours a day. He also asked how many off-leash dog citations had Police Chief Macias issued during her tenure? After council discussion, Councilmember Kern made a motion, seconded by Councilmember Mackin, to approve a 90-day pilot program for use of a camera in the community park. The motion was denied by a 3-2 vote.
Ayes: Councilmember Kern and Mayor Mackin
Noes: Councilmember Davis, Lentz and O’Connell
Absent: None
Abstain: None
Councilmembers took a brief recess.
City Council Meeting Minutes
March 5, 2026
OLD BUSINESS CONTINUED
L. Development Impact Fees Workshop
(Staff recommend council continue discussion on proposed development impact fees and provide direction and feedback on fee setting.)
After a brief presentation from Assistant City Manager Fernandez, some council questions, no public comment and some council discussion on proposed development impact fees, Councilmember Davis made a motion, seconded by Councilmember Lentz, to extend the meeting until 10 P.M. The motion was carried unanimously by all present.
Ayes: Councilmembers Davis, Kern, Lentz, O’Connell and Mayor Mackin Noes: None
Absent: None
Abstain: None
After further council discussion, staff members were directed to bring back a Development Impact Fees Public Hearing Item at a future council meeting to consider recommended impact fees.
STAFF REPORTS
O. City Manager’s Report- City Updates and Upcoming Activities i. Preparing for the City Council Priorities Study Session on March 21, 2026 City Manager Dennis announced that staff is preparing for the Council Priorities Study Session on March 21, 2026 at the DoubleTree Hotel. He also provided updates on upcoming city activities.
MAYOR/COUNCIL MATTERS
P. Future Agenda Items
Councilmember O’Connell opposed the bundling of event sponsorship since the timing may not be ideal for organizations coordinating events. Councilmembers agreed to agendize at a future meeting the following items:
• Brisbane Acres Properties as preservation priority areas and their eligibility • Tenant Occupancy Tax with a comparison of other cities.
Q. Countywide Assignments and Subcommittee Reports
i. Parkside 2 Ad Hoc Subcommittee Update
ii. Report Out on Subcommittee Meetings
iii. Upcoming Subcommittee Meetings
Councilmembers briefly reported on their county assignment meetings.
R. Written Communications
City Council Meeting Minutes
March 5, 2026
Written Correspondence was received from the following members of the public:
• Ames (2/22/26) Request to Consider Long-Term Cost Savings of Tesla Upfits for Police Cruiser Fleet • Nunan (2/23/26) Request to Halt Camera Trial in the Park • Hornick (2/24/26) Two-Year Delay in Repairing Brisbane Beach Volleyball Courts - Why? • Follien (3/4/26) Regarding the BCC Mtg Agenda New Business Item N. Pilot Camera in Community Park • Au-Young, et. al (3/4/26) Request for Review of Cracker Park Zoning • Mills (3/5/26) Request for Parent Input and Caution Regarding Proposed Camera at Community Park • C (3/5/26) cameras at the park
• Wilhelm (3/5/26) Proposal for cameras in the park
• Davis (3/5/26) Item N, Community Park Cameras
• Paepcke (3/5/26) Concerns Regarding Proposed Surveillance Camera in the Park ORAL COMMUNICATIONS NO. 2
No members of the public wished to make public comment.
ADJOURNMENT
Mayor Mackin adjourned the meeting at 10:01 P.M.
Ingrid Padilla
City Clerk
BRISBANE CITY COUNCIL
ACTION MINUTES
CITY COUNCIL CLOSED SESSION MEETING AGENDA
THURSDAY, FEBRUARY 19, 2026
HYBRID MEETING, 50 PARK PLACE CITY HALL CONFERENCE ROOM, BRISBANE, CA 94005
5:00 P.M. CALL TO ORDER
A. Approval of the Closed Session Agenda
B. Public Comment. Members of the public may address the Councilmembers on any item on the closed session agenda
C. Adjournment into Closed Session
D. CONFERENCE WITH LABOR NEGOTIATOR
Government Code Section 54957.6
Designated representative: Jeremy Dennis, City Manager
Employee organization: All Bargaining Units
E. CONFERENCE WITH LEGAL COUNSEL—ANTICIPATED LITIGATION Government Code, Section 54956.9 (d). Number of Cases: One Mayor Mackin called the meeting to order at 5:04 P.M.
Councilmember O’Connell made a motion, seconded by Councilmember Davis to approve the Closed Session Meeting agenda as it stands. The motion passed unanimously by all present.
Ayes: Councilmembers Davis, Kern, Lentz, O’Connell and Mayor Mackin Noes: None
Absent: None
Abstain: None
There was no public comment. Mayor Mackin adjourned the meeting into Closed Session.
REPORT OUT OF CLOSED SESSION
City Attorney McMorrow reported that direction was provided to staff regarding the Conference with Labor Negotiator Item D and the Anticipated Litigation Item E.
ADJOURNMENT
The meeting was adjourned at 6:27 P.M.
Ingrid Padilla, City Clerk
FACE CARRY MARKET COUPON
INVESTMENT DATE OF VALUE OF VALUE OF VALUE OF INTEREST MATURITY RATING/ NAME OF DEPOSITORY TYPE INVESTMENT INVESTMENT INVESTMENT INVESTMENT RATE % DATE COLLATERAL WELLS FARGO Checking A/C $ 2,074,094 $ 2,074,094 $ 2,074,094 0.000 110% collateral STATE FUND (LAIF) Deposit on call continuous $ 13,334,735 $ 13,334,735 $ 13,334,735 3.900 on call no rating Other Investments
FHLB 3/25/2022 $ 1,000,000 $ 1,000,000 $ 989,250 2.600 03/25/2027 FFCB 11/28/2025 $ 1,000,000 $ 1,000,000 $ 999,240 3.970 11/28/2028 FNMA 2/27/2026 $ 1,000,000 $ 1,000,000 $ 999,820 4.000 08/20/2029 FFCB 11/28/2025 $ 1,000,000 $ 1,000,000 $ 998,290 4.150 05/28/2030 FHLB 10/21/2025 $ 1,000,000 $ 1,000,000 $ 1,001,630 4.125 10/21/2030 FHLM 12/23/2025 $ 1,000,000 $ 1,000,000 $ 1,002,650 4.000 12/23/2030 FHLB 12/30/2025 $ 1,000,000 $ 1,000,000 $ 997,490 4.215 12/27/2030 FHLMC 2/26/2026 $ 1,000,000 $ 1,000,000 $ 999,790 4.050 02/26/2031 BNY Mellon Treasury Obligations continuous $ 6,039,628 $ 6,039,628 $ 6,039,628 3.600 on call 110% collateral Sub-total $ 14,039,628 $ 14,039,628 $ 14,027,788
U.S. Bank 2014 BGPGA Bond (330) Improvements Fed Treas Obl $ - 10031 Reserve Fund Fed Treas Obl $ 1 10032
Revenue Fund Fed Treas Obl $ - 10034
Expense Fund Fed Treas Obl $ - 10035
Principal Fed Treas Obl $ 1 10036
Interest Fund Fed Treas Obl $ 0 10037
U.S. Bank 2015 Utility Capital (545) Improvements Fed Treas Obl $ - 10031 Reserve Fed Treas Obl $ 74,403 10032
Expense Fund Fed Treas Obl $ - 10035
BNY Mellon 2023 BGVMIDFA Bond (328) Improvements Fed Treas Obl $ 67 10031 Reserve / Project Fed Treas Obl $ 1,446,567 10032
Expense Fund Fed Treas Obl $ - 10035
Principal Fed Treas Obl $ - 10036
Interest Fund Fed Treas Obl $ 36 10037
PARS OPEB Trust Trust Cash Investments $ 5,331,631 13050 PARS Retirement Trust Trust Cash Investments $ 1,937,780 13050 Sub-total Cash with Fiscal Agents $ 8,790,485
Total other investments $ 22,830,113 $ 22,830,113 $ 14,027,788 TOTAL INVESTMENTS & CASH BALANCES $ 38,238,942 $ 38,238,942 $ 29,436,617 Outstanding Loans to Department Heads / Former Employees Date of loan Amount Amount Remaining Interest Rate
Stuart Schillinger 4/1/2002 318,750 $ 318,750 Variable, LAIF + 1% FFCB - Federal Farm Credit Bank
FHLB - Federal Home Loan Bank
FHLM - Federal Home Loan Mortage Corporation
FNMA -Federal National Mortgage Association
Two year Treasury 3.38%
Weighted Interest 3.56%
Weighted maturity 1.15 Years
TREASURER'S CERTIFICATE
These are all the securities in which the city funds, including all trust funds and oversight agencies funds, are invested and that (excluding approved deferred compensation plans) all these investments are in securities as permitted by adopted city policy.
It is also certified that enough liquid resources (including maturities and anticipated revenues) are available to meet the next six months' cash flow.
Carolina Yuen
CITY TREASURER
CITY OF BRISBANE
CASH BALANCES & INVESTMENTS
SOURCE OF FUNDING
February 28, 2026
FACE MARKET FACE FACE
INVESTMENT VALUE OF VALUE OF VALUE OF VALUE OF
NAME OF DEPOSITORY TYPE INVESTMENT INVESTMENT INVESTMENT INVESTMENT WELLS FARGO Checking A/C $ 2,074,094 $ 2,074,094 $ 4,569,395 $ (2,495,301) (54.6%) $ 7,122,423 $ (5,048,328) (70.9%) STATE FUND (LAIF) Deposit on call $ 13,334,735 $ 13,334,735 $ 13,334,735 $ - 0.0% $ 2,617,684 $ 10,717,051 409.4% Other Investments
Sub-total BNY Mellon $ 14,039,628 $ 14,027,788 $ 12,014,866 $ 2,024,762 16.9% $ 25,112,907 $(11,073,279) (44.1%) Sub-total Cash with Fiscal Agents $ 8,790,485 $ 8,596,460 $ 194,025 2.3% $ 8,035,130 $ 755,355 9.4% Total other investments $ 22,830,113 $ 20,611,326 $ 2,218,787 $ 33,148,037 $ (10,317,924) TOTAL INVESTMENTS & CASH BALANCES $ 38,238,942 $ 29,436,617 $ 38,515,456 $ (276,514) (0.7%) $ 42,888,143 $ (4,649,201) (10.8%) - -
Change in Face Value Change in Face Value
CITY OF BRISBANE
CASH BALANCES & INVESTMENTS
Comparative Review
January 31, 2026
Previous Month Previous Year
2.50%
3.00%
3.50%
4.00%
4.50%
Interest Rates
2-year Treasury
LAIF
BNY Mellon Money
Market
City's Portfolio
Weighted Interest
February 2026 Review
The City's overall investments and cash balances decreased by net $277K from the previous month, primarily due to the residual payment of $468K towards a fire apparatus ordered in 2023, offset with an increase in sales taxes and utility billing receipts.
As reflected on Page 1, the BNY Mellon agency bonds subtotal grew to $8M. The City continues to seek and purchase longer term bonds with rates higher than LAIF to ladder maturities when available. One $1M bond earning 3.75% was redeemed and offset with purchases of two bonds, each for $1M, with rates of 4.0% and 4.05%. The City also moved $2M of noninterest earning funds from WFB to the BNY Custody Money Market account.
The shift in balances from WFB to higher-earning accounts in BNY Custody Money Market accounts resulted in a slight increase in the City's portfolio weighted interest to 3.56%, slightly higher than the 2-year Treasury rate benchmark of 3.38%.
The City's Cash with Fiscal Agents February 2026 $8.8M balance is primarily comprised of $7.3M of the PARS trust accounts and $1.5M of the 2023 Bond proceeds held in trust, as reflected on Page 1. The increase of $194K included a transfer of $74K to cover March debt service payments, and the remaining was for interest earned on the 2023 Bond series and PARS trust accounts.
City Council Staff Report
Meeting Date: April 2, 2026
From: Jeremy Dennis, City Manager
Subject: Adopt Resolution Authorizing the Director of Public Works or the City Clerk to Accept and Consent to Deeds
or Grants of Real Estate
Recommendation
Staff recommends adopting a resolution authorizing the Director of Public Works or the City Clerk to accept and consent to deeds or grants of real estate.
Background
Section 27281 of the Government Code pertains to the requirements for recording deeds or grants conveying any interest in or easement upon real estate to political corporations or governmental agencies for public purposes. Specifically, it states that such documents must not be accepted for recordation without the consent of the grantee, evidenced by a certificate or resolution of acceptance attached to the deed or grant.
In 1977, the Brisbane City Council adopted Resolution No. 1977-56 authorizing the Director of Public Works to accept and consent to deeds or grants of real estate.
Discussion
Should the Director of Public Works not be available to accept and consent to deeds or grants of real estate, this resolution will authorize the City Clerk to have acceptance authority. Having options will help expedite the recording process.
Generally, before deeds or grants of interest in real property are accepted, City Council provides its consent and authorizes the deed or grant to be recorded. From time to time, however, the City may require an easement or a small section of property for utility or similar purposes. In those cases, the Public Works Director has accepted the easement without taking the item to Council. Accordingly, similar to the Resolution in 1977, prior to the Director of Public Works or the City Clerk accepting and consenting to any deed or grant, the relevant official shall notify the City Council, in writing, the name of grantor and purpose of the deed or grant for which the official intends to accept and consent.
Fiscal Impact
None.
Attachments
1. Resolution 2026 -XX
2. Resolution Number 1977-56
City Manager Approval
Jeremy Dennis, City
Manager
03/24/2026
ATTACHMENT 1
RESOLUTION NO. 2026-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRISBANE AUTHORIZING THE
DIRECTOR OF PUBLIC WORKS OR THE CITY CLERK TO ACCEPT AND CONSENT TO DEEDS
OR GRANTS OF REAL ESTATE
WHEREAS, Section 27281 of the Government Code provides that a political corporation or governmental agency for public purposes may not have deeds or grants conveying an interest in or easement upon real estate to it accepted for recordation without its consent evidenced by its certificate or resolution of acceptance; and WHEREAS, the City Council may, by general resolution, authorize an officer or agent to accept and consent to a deed or grant conveying an interest in or easement upon real estate to the City and it is in the interest of convenience and efficiency to designate the Director of Public Works or the City Clerk asthe officers authorized to accept deeds and grants.
THE CITY COUNCIL OF THE CITY OF BRISBANE RESOLVES as
follows:
1. The Director of Public Works and the City Clerk are authorized to accept and consent to all deeds and grants conveying an interest in or easement upon real estate to the City of Brisbane for public purposes.
2. Whenever a grantor conveys an interest in or easement upon real estate to the City of Brisbane by deed or grant for a public purpose, theDirector of Public Works or the City Clerk is authorized to accept and consentto thedeed orgrant and to execute a Certificate of Acceptance and consent in substantially the following form:
This is to certify that the interest in real property conveyed by the deed or grant dated _________ from _________ to _________ , a political corporation and/or governmental agency is hereby accepted by order of the(legislative body) on (date),(or by the undersigned officer or agent on behalf of the Brisbane City Council pursuant to authority conferred by resolution of the City of Brisbane City Council adopted on (date) ,)and the grantee consents to recordation thereof by its duly authorized officer.
Dated ____________________By
3. Prior to the Director of Public Works or the City Clerk accepting and consenting to any deed or grant, the relevant official shall notify the City Council, in writing, the name of the grantor and purpose of the deed or grant for which the official intends to accept and consent.
4. Resolution No. 1977-56 is rescinded.
5. This resolution shall take effect immediately upon its adoption.
________________
Mayor
I, the undersigned, hereby certify that the foregoing Resolution No. 2026-XX, was duly and regularly passed and adopted by the Brisbane City Council at a regular meeting held thereof, on April 2, 2026, by the following vote:
Ayes:
Noes:
Absent:
Abstain:
________________
City Clerk
Attachment 2
City Council Staff Report
Meeting Date: April 2, 2026
From: Maz Bozorginia, Public Works Director, Jerry Flanagan Subject: Adopt Resolution Approving and Recertifying of the City of Brisbane's 2026 Sewer System Management Plan
Recommendation
Adopt a resolution approving and re-certifying the City's 2026 Sewer System Management Plan (SSMP).
Background
The California State Water Resources Control Board (SWRCB) adopted the Statewide General Waste Discharge Requirements (WDRs) for Sanitary Sewer Systems (Order No. 2006-0003- DWQ) on May 2, 2006, to establish uniform, statewide regulatory requirements governing the operation, maintenance, and management of wastewater collection systems. These requirements apply to all public agencies that own or operate sanitary sewer systems consisting of more than one mile of pipeline conveying wastewater to a publicly owned treatment facility. The 2006 Order was subsequently amended in 2008 and 2013 to clarify and strengthen regulatory provisions.
On December 6, 2022, the SWRCB adopted the reissued Statewide WDR (Order No. 2022- 0103-DWQ), which became effective on June 5, 2023, thereby rescinding and replacing the 2006 Order. The reissued Order incorporates updated regulatory requirements, enhanced reporting and monitoring provisions, and expanded technical criteria, including more prescriptive requirements for the development, implementation, and periodic evaluation of Sewer System Management Plans (SSMPs).
Pursuant to the Statewide WDRs, each enrolled sanitary sewer system is required to develop, implement, and maintain an SSMP that documents the agency’s policies, procedures, and activities for the proper management, operation, and maintenance of its wastewater collection system. The SSMP must address key program elements, including system inventory, operations and maintenance, overflow emergency response, fats, oils, and grease (FOG) control, capacity management, monitoring and reporting, training, and program audits. The SSMP is required to be updated at a minimum frequency of once every six (6) years and must be recertified by the governing body upon completion of any significant revisions.
Discussion
The 2026 Sewer System Management Plan represents the City of Brisbane’s formal certification of compliance with the requirements set forth in Statewide WDR Order No. 2022-
0103-DWQ. This document establishes the City’s comprehensive framework for ensuring regulatory compliance, minimizing sanitary sewer overflows (SSOs), and maintaining the longterm reliability and resilience of the wastewater collection system. As a living document, the SSMP is subject to ongoing evaluation and refinement to incorporate regulatory updates, operational improvements, and evolving best management practices.
Adoption of this Resolution is not a project under CEQA because it is a continuing administrative activity, such as general policy and procedure making, and not applied to any specific instance. CEQA Guidelines, Section 15378 (b)(2). Accordingly, no further environmental review is necessary.
Fiscal Impact
None as a direct result of the recommended actions.
Attachments
1. Resolution
2. City of Brisbane Sewer System Management Plan (SSMP) City Manager Approval
Jeremy Dennis, City
Manager
03/24/2026
1 RESOLUTION NO. 2026-__
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRISBANE APPROVING AND RE-CERTIFYING THE CITY’S SEWER SYSTEM
MANAGEMENT PLAN (SSMP)
WHEREAS, the State Water Resources Control Board (SWRCB) adopted Order No. 2006- 0003-DWQ, Statewide General Waste Discharge Requirements (GWDR) for Sanitary Sewer Systems dated May 2, 2006, and Order No WQ-2008-0002-EXEC dated February 20, 2008, to regulate all sanitary sewer collection systems greater than one mile in length that discharge to a publicly owned sewage treatment facility, and
WHEREAS, the SWRCB issued Order No. WQ-2013-0058-EXEC, effective September 9, 2013, amending the Monitoring and Reporting Program (MRP) elements of the General Waste Discharge Requirements, and
WHEREAS, the SWRCB reissued Order No. WQ-2022-0103-DWQ, effective June 5, 2023, rescinding the 2006 and 2013 General Waste Discharge Requirements, and including several new requirements, and
WHEREAS, the GWDR requires that an enrolled sanitary sewer collection system prepare and implement a Sewer System Management Plan (SSMP) documenting the enrollee’s program to properly operate and maintain its sanitary sewer system, and that the SSMP be updated every six (6) years, and must be re-certified by the governing body when significant updates to the SSMP are made, and
WHEREAS, the City of Brisbane, as the owner and operator of the City’s sanitary sewer collection system, most recently adopted and certified the SSMP on October 1, 2020, pursuant to City Council Resolution No. 2020-59; and
WHEREAS, staff has updated the City’s 2026 SSMP in conformance with SWRCB Order WQ 2022-0103-DWQ.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brisbane as follows:
2 1. The City of Brisbane hereby approves and re-certifies the 2026 SSMP prepared in accordance with the Order and directs the Director of Public Works to implement and periodically update the SSMP as necessary to comply with current regulatory requirements and best practices.
_________________________________
Coleen Mackin, Mayor
I hereby certify that the foregoing Resolution No. 2026-__ was duly and regularly adopted at the regular meeting of the Brisbane City Council on April 2, 2026 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
_________________________________
Ingrid Padilla, City Clerk
City of Brisbane
Sewer System Management Plan
April 2026
Prepared by:
Public Works Department
50 Park Place
Brisbane, CA 94005
Ph: 415-508-2130
Fax: 415-467-5547
City of Brisbane – Sewer System Management Plan i
Table of Contents
Acronyms & Terms...................................................................................................................... iii List of Acronyms ..................................................................................................................... iii List of Terms ............................................................................................................................. v Element 1 – Goals and Introduction ........................................................................................... 1 A. Introduction ...................................................................................................................... 1 B. City of Brisbane’s Goals .................................................................................................. 1 C. Regulatory Context .......................................................................................................... 2 D. SSMP Update and Audit Schedule .................................................................................. 2 E. City of Brisbane Service Area and Collection System .................................................... 2 Element 2 – Organization ............................................................................................................. 5 A. Organizational Chart and SSMP Responsibilities ............................................................ 5 B. Legally Responsible Official ............................................................................................ 8 C. Chain of Communication for Reporting and Responding to Spills ................................. 8 Element 3 – Legal Authority ...................................................................................................... 10 A. Agreements with Other Agencies .................................................................................. 10 Element 4 – Operation and Maintenance Program ................................................................. 11 A. Collection System Map .................................................................................................. 11 B. Resources and Budget .................................................................................................... 11 C. Prioritized Preventive Maintenance ............................................................................... 12 D. Scheduled Inspections and Condition Assessment ........................................................ 13 E. Contingency Equipment and Replacement Inventories ................................................. 14 F. Training .......................................................................................................................... 15 G. Outreach to Plumbers and Building Contractors............................................................ 15 Element 5 – Design and Performance Provisions .................................................................... 16 A. Standards for Installation, Rehabilitation, and Repair ................................................... 16 B. Standards for Inspection and Testing of New and Rehabilitated Facilities ................... 16 Element 6 – Spill Emergency Response Plan ........................................................................... 17 A. Staff Notification ............................................................................................................ 17 B. Crew Response ............................................................................................................... 18 C. Spill Categories, Notification, and Reporting ................................................................ 20 D. Spill Online Reporting ................................................................................................... 24 E. Reporting to Other Regulatory Agencies ....................................................................... 28 F. Record Keeping Requirements: ..................................................................................... 28 G. Certification .................................................................................................................... 29 H. Staff Field Exercises ...................................................................................................... 30 Element 7 – Sewer Pipe Blockage Control Program ............................................................... 31 A. Source Identification: ..................................................................................................... 31 B. Source Control: .............................................................................................................. 31 C. Inspection and Maintenance: .......................................................................................... 31 D. Legal Authority: ............................................................................................................. 32 Element 8 – System Evaluation, Capacity Assurance and Capital Improvements .............. 33 A. System Evaluation and Condition Assessment .............................................................. 33 B. Capacity Assessment and Capital Improvement Plan .................................................... 33 Element 9 – Monitoring, Measurement, and Program Modifications ................................... 34 Element 10 – Internal Audits ..................................................................................................... 36
City of Brisbane – Sewer System Management Plan ii
Element 11 – Communication Program ................................................................................... 37 APPENDIX A: SSMP Revision Log .......................................................................................... 38 APPENDIX B: City of Brisbane Public Works Emergency Contact List ............................. 40 APPENDIX C: Relevant Municipal Code Sections Overall Legal Authority ....................... 41 APPENDIX D: City Standards for Sewer Installation, Rehabilitation, and Repair ............ 56 APPENDIX E: Municipal Code Sections Fats, Oils, and Grease ........................................... 66 APPENDIX F: Water Quality Monitoring Plan ...................................................................... 70 APPENDIX G: Spill Response Plan & Field Response Documentation Packet ................... 74 APPENDIX H: Lift Station Emergency Response Plans ........................................................ 95 APPENDIX I: Brisbane/GVMID Sanitary Sewer System Map ............................................. 96 APPENDIX J: Equipment Inventory List and Staff Training List ....................................... 97 APPENDIX K: Brisbane Gravity Sewer Assets ....................................................................... 98 APPENDIX L: SSMP Internal Audit Report .......................................................................... 99
City of Brisbane – Sewer System Management Plan iii
Acronyms & Terms
List of Acronyms
CCTV Closed-Circuit Television
CIP Capital Improvement Project
CITY City of Brisbane
CIWQS California Integrated Water Quality System
CMMS Computerized Maintenance Management System
CRT Chemical Root Treatment
CWEA California Water Environment Association
DPW Department of Public Works
EHS San Mateo Environmental Health Services
FOG Fats, Oils and Grease
FSE Food Service Establishments
GIS Geographical Information System
GPM Gallons per Minute
GVMID Guadalupe Valley Municipal Improvement District
GWDR Statewide General Waste Discharge Requirements
I&I Inflow & Infiltration
LRO Legally Responsible Official
NASSCO National Association of Sewer System Companies
NPDES National Pollution Discharge Elimination System
OERP Overflow Emergency Response Plan
OES California Office of Emergency Services (Previously Cal-EMA) PM Preventive Maintenance
PPE Personal Protective Equipment
RWQCB Regional Water Quality Control Board
SCADA Supervisory Control and Data Acquisition
SERP Spill Emergency Response Plan
SFPUC San Francisco Public Utilities Commission
SSMP Sewer System Management Plan
City of Brisbane – Sewer System Management Plan iv
SSO Sanitary Sewer Overflow
SWRCB State Water Resources Control Board
WDID Waste Discharger Identification Number
WDR General Waste Discharge Requirements, also called the Statewide WDR WWTP Wastewater Treatment Plant
City of Brisbane – Sewer System Management Plan v
List of Terms
Blockage – An object that partially or fully hinders flow through a sewer pipeline. The blockage can be caused by debris in the sewer, grease buildup, root intrusion, or a partial or full collapse of the pipeline. Also known as a stoppage.
California Integrated Water Quality System (CIWQS) – A computer system used by the State and Regional Water Quality Control Boards to track information about SSOs, among other information. CIWQS is the tool used for online submittal of SSO details, which are then made available to the public. Website: http://www.swrcb.ca.gov/ciwqs/ Enrollee – The legal public entity that owns a sanitary sewer system, as defined by the Statewide WDR. Also known as a sewer system agency or wastewater collection system agency.
Geographic Information System (GIS) – A database linked with mapping that records sewer system information. The GIS database could include sewer features such as pipe location, diameter, material, condition, or last date cleaned or repaired. GIS maps also typically contain base information such as streets and parcels.
Infiltration – The seepage of groundwater into a sewer system, including from service connections. Seepage frequently occurs through defective or cracked pipes, pipe joints, connections or manhole walls and joints.
Inflow – Water discharged into a sewer system from such sources as roof leaders, cellars, yard and area drains, foundation drains, through holes in manhole covers, cross connections from the storm system or street wash waters. Inflow differs from infiltration in that it is a direct discharge into the sewer rather than a leak through defects in the sewer.
Lateral or Private Lateral – The privately-owned sewer pipeline that conveys wastewater from the premises of a user to the City’s sewer system. The upper lateral extends from the building to property line (or easement line). The lower lateral extends from the property or easement line to the connection to the City-owned sewer main pipe.
Overflow Emergency Response Plan (OERP) – This document identifies measures that are needed to respond to sanitary sewer overflows in a way that maximizes the protection of public health and the environment.
Rehabilitation and Replacement Plan (also referred to as a Capital Improvement Plan) – Identifies and prioritizes system deficiencies and implements short-term and long-term rehabilitation actions to address each deficiency.
San Francisco Bay Regional Water Quality Control Board – Also known as Region 2 or RWQCB. This regulatory agency preserves, enhances and restores the quality of California's water resources, and ensures their proper allocation and efficient use for the benefit of present and future generations. Website: http://www.waterboards.ca.gov/sanfranciscobay
City of Brisbane – Sewer System Management Plan vi
Sanitary Sewer Spill (Spill) – Any release, discharge or diversion of untreated or partially treated wastewater from a sanitary sewer system, including releases that reach waters of the United States, overflows or releases that do not reach water of the United States, and backups into buildings and/or private property caused by conditions within the publicly owned portion of the sewer system.
Sanitary Sewer System – Any system of pipes, pump stations, sewer lines, or other conveyances, upstream of a wastewater treatment plant head works used to collect and convey wastewater to the wastewater treatment plant.
Sewer Pipe Blockage Control Program –Program implemented at the discretion of the agency, based on the identified causes of sewer overflows, to reduce the discharge of fats, oils and grease into the sewer system.
Sewer System Management Plan (SSMP) – A series of written programs that address how a collection system owner/operator conducts daily business. Each SSMP is unique for an individual discharger. The plan includes provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems, while taking into consideration risk management and cost benefit.
Spill Emergency Response Plan (SERP) – This document identifies measures that are needed to respond to sanitary sewer overflows in a way that maximizes the protection of public health and the environment.
State Water Resources Control Board – Also called the State Board. This agency developed and passed the Statewide Waste Discharge Requirements for collection systems and maintains the spill reporting web site.
System Evaluation and Capacity Assurance Plan – A required component of an agency’s SSMP that provides hydraulic capacity of key sanitary sewer system elements for dry weather peak flow conditions, as well as the appropriate design storm or wet weather event.
Statewide Waste Discharge Requirements – The Statewide General Waste Discharge Requirements for Sanitary Sewer Systems was adopted by the SWCRB in 2023 (Order No. 2022-0103-DWQ).
Wastewater Collection System – See Sanitary Sewer System.
City of Brisbane – Sewer System Management Plan 1
Element 1 – Goals and Introduction
A. Introduction
This Sewer System Management Plan (SSMP) has been prepared in compliance with the State Water Resources Control Board (SWRCB) Statewide General Waste Discharge Requirements for Sanitary Sewer Systems, Order No. 2022-0103-DWQ (GWDR). The 2026 SSMP update reflects the City of Brisbane’s ongoing efforts to meet current requirements of the GWDR. The City of Brisbane’s waste discharger identification number (WDID) in the California Integrated Water Quality System (CIWQS) is 2SSO10097.
The SSMP is a living document and is updated as needed to reflect changes that are made to wastewater collection management, and to update the SSMP elements as identified through the tri-annual audit process. The SSMP includes 11 elements as listed below. Each of these elements forms a section of this document.
SSMP Elements Element 1 – Goals and Introduction Element 2 – Organization Element 3 – Legal Authority Element 4 – Operation and Maintenance (O&M) Program Element 5 – Design and Performance Standards Element 6 – Spill Emergency Response Plan (SERP) Element 7 – Sewer Pipe Blockage Control Program Element 8 – System Evaluation and Capacity Assurance Plan Element 9 – Monitoring, Measurement, and Program Modifications Element 10 – SSMP Program Audits Element 11 – Communication Program B. City of Brisbane’s Goals
1. To maintain a safe, cost-effective, and reliable wastewater collection system for the residents and businesses in Brisbane.
2. To properly manage, operate, and maintain all parts of the wastewater collection system.
3. To provide adequate capacity to convey peak flows.
4. To eliminate sanitary sewer overflows (SSOs).
5. To minimize and mitigate impacts of SSOs.
6. To educate the public regarding proper disposal practices for materials which are detrimental to a collection system.
City of Brisbane – Sewer System Management Plan 2
C. Regulatory Context
The City of Brisbane has adopted this SSMP in accordance with the Statewide General Waste Discharge Requirements General Order for Sanitary Sewers (GWDR). The first SSMP to be adopted by City Council was in August 2006 under General Order No. 2006-0003-DWQ. Since the first adoption of the SSMP, the plan has been audited and updated to remain compliant with the SWRCB’s regulations, including Order No. WQ-2008-0002-EXEC effective in February 2008 and Order No. WQ-2013-0058-EXEC effective in September 2013. The SSMP was adopted and approved previously by City Council in 2010 and most recently on October 1, 2020.
Under the reissued General Order, 2022-0103-DWQ, effective on June 5, 2023, the SSMP must be updated within every six (6) years after the required due date of its last plan update and audited internally every three (3) years. The completed SSMP updates and audits are uploaded to the California Integrated Water Quality System (CIWQS). A copy of the SSMP Revision Log can be found in Appendix A.
D. SSMP Update and Audit Schedule
The City’s SSMP update schedule is shown in Table 1-1 below and follows the required update plan for every six (6) years. The SWRCB has created an online look-up tool to show each System’s SSMP audit and update due dates.
https://www.waterboards.ca.gov/water_issues/programs/sso/lookup Table 1-1. Schedule for SSMP Updates and Audits
Required Update Required Date of Submittal
3-Year SSMP Audit, ending May 2, 2025 November 2, 2025
2026 SSMP Update May 2, 2026
3-Year SSMP Audit, ending May 2, 2028 November 2, 2028
3-Year SSMP Audit, ending May 2, 2031 November 2, 2031
2032 SSMP Update May 2, 2032
3-Year SSMP Audit, ending May 2, 2034 November 2, 2034
3-Year SSMP Audit, ending May 2, 2037 November 2, 2037
2038 SSMP Update May 2, 2038
E. City of Brisbane Service Area and Collection System
The City of Brisbane is located within the County of San Mateo, with the City of San Francisco directly to the north, and provides sanitary sewer services to the residents and businesses within its 3.4 square mile service area. The service area consists of approximately 4,900 residents, several commercial areas and some light industrial development. The wastewater collection system consists of more than 80,000 feet of laterals, mains, trunks and 20,000 feet of force mains, ranging in size from 6 to 24 inches in diameter. Additionally, there are approximately 4,350 feet of private sewers consisting of 4- and 6-inch diameter pipelines. A series of gravity
City of Brisbane – Sewer System Management Plan 3
collection system mains and smaller lift stations convey most of the wastewater flow to the Valley Drive Lift Station. The wastewater is then delivered to the 66-inch diameter City of San Francisco (SFPUC) interceptor and ultimately conveyed to the SFPUC Southeast Treatment Plant.
The City of Brisbane currently has a wholesale wastewater service agreement with the SFPUC, to convey, treat, and dispose of wastewater through the SFPUC treatment plant facilities. The City also has an agreement with the City of South San Francisco to receive and provide sanitary sewer service from a small commercial area located just outside the southern border of the City of Brisbane.
Figure 1-1. City of Brisbane Service Area and Wastewater Collection System Map
City of Brisbane – Sewer System Management Plan 4
Tables 1-2 through 1-4 provide information about the City’s sewer collection system assets.
Some totals may not be exact due to rounding.
Table 1-2. Size and Distribution of Active Gravity Sewers Pipe Diameter (in) Gravity Length (ft) Total Length (miles) Percentage of Total (%) 6" 39,074 7.40 42.66%
8" 33,334 6.31 36.39%
10" 5,709 1.08 6.23%
12" 4,292 0.81 4.69%
14" 1,158 0.22 1.26%
15" 5,767 1.09 6.30%
16" 29 0.01 0.03%
18" 2,166 0.41 2.36%
24" 75 0.01 0.08%
Totals: 91,603 17.35 100%
Table 1-3. Size and Distribution of Active Force Main Sewers Pipe Diameter (in) Force Main Length (ft) Total Length (miles) Percentage of Total (%) 6" 4,277 0.81 19%
8" 8,948 1.69 41%
12" 2,386 0.45 11%
16" 6,365 1.21 29%
Totals: 21,977 4.16 100%
Table 1-4. Lift Station Information
Lift Station Number of Pumps Firm Capacity (gpm)
Valley Drive Lift Station 4 2,220
Lift Station #1 (Harbormaster) 2 200
Lift Station #4 (Sierra Point) 3 1,180
Lift Station #5 (Fire Station #81) * 2 100
*LS #5 is owned by the North County Fire Authority but is maintained by the City.
City of Brisbane – Sewer System Management Plan 5
Element 2 – Organization
A. Organizational Chart and SSMP Responsibilities
The organizational structure within the City of Brisbane is detailed in Figure 2-1.
Figure 2-1. – City of Brisbane Organizational Flow Chart City Council
City Manager
City Clerk Communications
Department
Dispatch, Police,
& Fire
Departments
Public Works
Director/ City
Engineer
Public Works
Inspector
Deputy Director
of Public Works -
Utilities
Assistant
Engineer -
Utilities
Public Works
Supervisor
Public Works
Utility Team
Leader
Public Works
Field Crew (2)
Engineering
Technician
Water Quality
Technician
Public Works
Administrative
Assistant
Finance
Department GIS Manager
City of Brisbane – Sewer System Management Plan 6
The roles for the various agency staff are further defined, as follows: City Council: Establishes policy, approves sewer rate structure City Manager: Establishes policy, leads staff, allocates resources, delegates responsibility, provides reports to City Council City Clerk: Provides written information updates to City Council, arranges for emergency meetings, as necessary Communications Department: Serves as Public Information Officer. Finance Department: Sets funding levels needed for maintaining collection system, allocates fiscal resources for collection system staff Dispatch, Police and Fire Departments: Receive off-hours or emergency calls reporting sanitary sewer overflows, respond to reports of illegal dumping or sanitary sewer overflows in off-hours, notify Public Works Supervisor/Utility Team Leader or Public Works Director of reports of sanitary sewer overflows GIS Manager: Helps develop, update, and manage the sanitary sewer maps and record drawings which are conveyed through an online sewer map viewer utilizing ArcGIS. Public Works Director/City Engineer: Leads staff, allocates resources, delegates responsibility, authorizes outside contractors to perform services, establishes department policy, approves sanitary sewer design criteria, provides verbal reports to City Manager and City Council. Serves primarily as the Legally Responsible Official (LRO). Deputy Director, Public Works Department - Utilities: Supervises the Public Works Supervisor/Utility Team Leader, provides technical oversight and support for the management, administration and maintenance of the wastewater collection system, establishes sanitary sewer design criteria, provides updates to the Public Works Director, manages compliance updates and implementation of the City’s SSMP, oversees sanitary system emergency response actions, and manages the Capital Improvement Program.
Serves as a Data Submitter for CIWQS reporting. Assistant Engineer - Utilities: Assists in investigating and reporting sanitary sewer overflows and works on the Capital Improvement Program for the collection system.
Assists with preparing and updating the SSMP. Serves as a Data Submitter for CIWQS reporting. Public Works Inspector: Inspects new sanitary sewer installation/improvements to ensure compliance with City standards, works with field crews to handle emergencies when contractors are involved, provides verbal reports to Public Works Director and Collection System Manager Public Works Administrative Assistant: Receives work-hour phone and radio reports from the public and city crews of sanitary sewer overflows, provides verbal and written documentation for overflows to Public Works Supervisor/Utility Team Leader and the Deputy Director, Public Works Department – Utilities. Public Works Supervisor: Manages field operations and maintenance activities, supervises the utility team leaders and sanitary maintenance team, delegates responsibility, responds to reports of sanitary sewer overflows, trains field crews, leads
City of Brisbane – Sewer System Management Plan 7
emergency response activities, provides verbal reports to the Deputy Director and Public Works Director. Water Quality Technician: Performs all sampling and field monitoring. Engineering Technician: Assists in investigating and reporting sanitary sewer overflows.
Assists with preparing and updating the SSMP. Serves as a Data Submitter for CIWQS reporting. Public Works Utility Team Leader: This lead position works as a member of the crew and performs the more difficult and complex maintenance and repair tasks, as well as assisting with supervising, training, and directing less experienced staff. Public Works Maintenance Field Crew: Perform preventive maintenance activities, mobilize and respond to notification of blockages and sanitary sewer overflows, including mobilizing sewer cleaning equipment, bypass pumping equipment, portable generators, and Vactor truck, provide verbal and written reports to Public Works Supervisor/Utility Team Leader.
The City’s Public Works Director has the ultimate responsibility for the management, administration, and maintenance of all elements of the City’s SSMP. The responsibility for dayto-day implementation and maintenance of each of the City’s SSMP elements has been delegated to City Staff. The responsibilities of each section of the SSMP are listed in Table 2-1 below.
Table 2-1. Responsibilities for SSMP Implementation
SSMP Element Description Staff Responsible
Element 1 - Goals Lead staff in the implementation and
updating of SSMP goals
Public Works Director,
Deputy Director
Element 2 -
Organization
Update organizational information;
identify and update SSO responding and
reporting chains of communication and
other SSMP assignments
Public Works Director,
Deputy Director
Element 3 – Legal
Authority
Uphold City Code and Ordinances; draft
new Ordinances as needed
Public Works Director,
Deputy Director
Element 4 – Operation
and Maintenance
(O&M) Program
Update wastewater collection system
maps, implement O&M activities and
rehabilitation/replacement program;
implement staff training activities
Public Works
Supervisor, Deputy
Director
Element 5 - Design and
Performance Standards
Ensure that all construction projects meet
City standards; update standards;
facilitate inspection of public works
projects
Deputy Director,
Assistant Engineer
Element 6 - Spill
Emergency Response
Plan (SERP)
Implement and update plan; implement
SERP training
Public Works
Supervisor
Element 7 - Sewer Pipe
Blockage Control
Program
Update and implement a Sewer Pipe
Blockage Control Program
Deputy Director,
Assistant Engineer
City of Brisbane – Sewer System Management Plan 8
Element 8 - System
Evaluation and Capacity
Assurance Plan
Regularly assess capacity requirements
for the sewer collection system;
incorporate recommendations in City
Capital Improvement Projects (CIP);
implement necessary improvements
Deputy Director,
Assistant Engineer
Element 9 - Monitoring,
Measurement, and
Program Modifications
Monitoring implementation of and
assessing success of the overall SSMP
program elements; identify trends in key
performance measures and provide
recommendations for improvement
Deputy Director,
Assistant Engineer
Element 10 - SSMP
Program Audits Oversee SSMP audits Deputy Director, Assistant Engineer Element 11 -
Communication
Program
Manage communication of SSMP
activities
Deputy Director,
Assistant Engineer
B. Legally Responsible Official
Per Section 5.1 of the Order 2022-0103-DWQ, the Legally Responsible Official (LRO) must have responsibility over the entire sanitary sewer system and have the authority to make decisions governing operations of the sewer system, including explicit or implicit duty of making capital improvement recommendations. Furthermore, the LRO must have or be in direct authority over individuals that:
1. Possess a recognized degree or certificate related to operations and maintenance of the sewer system, and/or
2. Have professional training and experience related to the management of sanitary sewer systems, demonstrated through extensive knowledge, training and experience.
In consideration of the above criteria, the City of Brisbane has designated the Director of Public Works, Maz Bozorginia, as the primary LRO for the Brisbane collection system.
C. Chain of Communication for Reporting and Responding to Spills In response to any spill event, the City of Brisbane Public Works implements a Spill Emergency Response Plan, which is discussed in detail in Element 6. The Spill Emergency Response Plan provides directions for the notification of City Staff and the California Office of Emergency Service (Cal OES).
If a spill is reported to City Hall during working hours, the Public Works Administrative Assistant will make note of the time reported, the name and contact information of the reporting party, and location and details of the spill. The Administrative Assistant will immediately notify the Public Works Supervisor or Utility Team Leader and provide the recorded information, and appropriate field crews will be dispatched to the site. Once City crews have responded to the site and assessed the situation, they will report back to the Public Works Supervisor or Utility Team Leader, who will then notify the Deputy Director, Public Works Department - Utilities with the details of the spill.
City of Brisbane – Sewer System Management Plan 9
For spills reported during non-working hours to the police or fire departments, dispatch will record the time reported, the name and contact information of the reporting party, and location and details of the spill. This information will be relayed to the Public Works Supervisor or Utility Team Leader or directly to on-call personnel if the Public Works Supervisor or Utility Team Leader cannot be reached. The Public Works Supervisor or Utility Team Leader will relay the details of the spill and dispatch the on-call personnel to the scene. The Deputy Director, Public Works Department - Utilities will be notified on the next working day unless the spill requires reporting within 2 hours, in which case, notification will occur as soon as feasible after the spill is corrected.
Table 2-2 City of Brisbane Public Works Emergency Spill Response Contact List Employee Title Office Cell
Maz Bozorginia Director of Public Works (415) 508-2131 (628) 219-2918 Jerry Flanagan Deputy Director of Public Works -
Utilities (415) 508-2137 (415) 321-0047
Diane Cannon Administrative Assistant (415) 508-2130 (415) 519-0748 Dustin Cohn Public Works Supervisor (415) 508-2105 (415) 629-1435 Kessel Crockett Public Works Utility Team Leader (415) 508-2130 (628) 219-2917 Juan Higareda Maintenance Utility Worker (415) 508-2130 (415) 254-0490 Gustavo Lule Maintenance Utility Worker (415) 508-2130 (415) 298-2886
Varies Public Works 24 hour
On-Call Staff N/A (415) 286-0164
Greg Morris Public Works Inspector (415) 508-2130 (415) 760-3053 Caleb Cayago Water Quality Technician (415) 508-2138 (415) 218-3584 Matthew Lee Assistant Engineer - Utilities (415) 508-2128 (415) 530-8990 Alexander Joel Engineering Technician (415) 508-2130 (415) 713-9266 Dispatch Brisbane Police (415) 467-1212 911
Engine 81 Brisbane Fire (415) 657-4300 (415) 716-0414
Battalion Chief (650) 740-7386 911
Dispatch San Mateo County (650) 368-1421 911
Company Nurse (650) 742-7110
A full Public Works Emergency Contact List can be found in Appendix B.
City of Brisbane – Sewer System Management Plan 10
Element 3 – Legal Authority
Although not required for collection systems serving a population of 10,000 or less under the SF Regional Water Quality Control Board requirements, adequate legal authority is required under the Statewide General Waste Discharge Requirements. Relevant sections of the Brisbane Municipal Code are included in Appendix C documenting the City's ability to:
Control infiltration/inflow from wastewater collection systems and laterals (SF RWQCB) Require proper design and construction of new and rehabilitated sewers and connections (SF RWQCB)
Require proper installation, testing, and inspection of new and rehabilitated sewers (SF RWQCB)
Prevent illicit discharges into the sanitary sewer system (State WDR) Require that sewers and connections be properly designed and constructed (State WDR) Ensure access for maintenance, inspection, or repairs for portions of the sewer lateral owned or maintained by the Public Agency (State WDR)
Limit the discharge of fats, oils, and grease and other debris that may cause blockages (State WDR)
Enforce any violation of its sewer ordinances (State WDR) A website link to the Brisbane Municipal Code in reference to the City sewer system use ordinances can be found here: Chapter 13.04 - SEWER SYSTEM | Municipal Code | Brisbane, CA | Municode Library
A. Agreements with Other Agencies
The City of Brisbane currently has a wholesale wastewater service agreement with the SFPUC, to convey, treat, and dispose of wastewater through the SFPUC treatment plant facilities. The City and the SFPUC meet to review the service agreement every few years, as needed.
The City also has an agreement with the City of South San Francisco to receive and provide sanitary sewer service from a small commercial area located just outside the southern border of the City of Brisbane.
City of Brisbane – Sewer System Management Plan 11
Element 4 – Operation and Maintenance Program
A. Collection System Map
The City currently has electronic maps of the entire sewer system in GIS format. As part of the 2003 Sanitary Sewer Master Plan development, all of the City's sewer manholes were surveyed and inspected, documenting size, rim and invert elevations, location coordinates, condition, and size and type of pipes entering and exiting. As such, the City now has electronic maps that show accurate manhole locations with rim and invert elevations and pipe sizes, lengths, and materials.
Maps include manhole and pipe IDs and can be cross-referenced with electronic street and parcel maps to give additional location information. Direction of flow can be determined from manhole invert elevations.
In 2016 the City updated the City’s Sanitary Sewer Maps after extensive field verification of the entire sanitary sewer system. This field information was then georeferenced in AutoCAD and mapped with a satellite imagery background into a 37-page map book of the entire system. The City has merged these CAD maps with the City’s GIS program to create searchable maps based off the CCTV database. A copy of the current sanitary sewer map system can be found in Appendix I.
In addition to the sanitary sewer maps, the City also maintains an electronic map of all applicable stormwater conveyance structures in GIS format. The City also has various historical sewer maps and construction plan sets, for both public and private sewers, all maintained in a databaseorganized filing system.
B. Resources and Budget
The City has a reliable, consistent funding source for collection system operations, maintenance, and repair through a dedicated Utility Fund. Revenues for this fund are generated by sewer service charges and connection fees, as well as some revenues that are part of the Guadalupe Valley Municipal Improvement District (GVMID) (a special district that the City Council also oversees). All sewer service charges and connections fees for the City and GVMID are the same.
The sewer operating budget includes funding for maintenance personnel salaries and benefits, insurance, services and supplies, and depreciation. Services and supplies include safety clothing, communications equipment, equipment maintenance, maintenance of structures, improvements, and/or grounds, association memberships, general office expenses, professional services, equipment rental, special department expenses, small tools and supplies, travel and training, and utility and wastewater treatment costs. The adopted budgets also include department objectives and associated performance measures.
The City has annual capital improvement budgets in addition to operations/maintenance budgets.
Capital projects vary from year to year. The Public Works Director requests funding from the City Council for capital improvement projects on a regular basis; however, the amount the Council allocates in any given year for sewer projects depends upon the City's overall capital improvement priorities for water, sewer, storm drain, streets, buildings, and grounds.
City of Brisbane – Sewer System Management Plan 12
The 2017 Sanitary Sewer Master Plan Update developed a list of priority-based Capital Improvement Projects. A couple of major developer-funded upgrades to the City’s Sanitary Sewer System were designed and implemented, which increased the capacity of flow at the Sierra Point Lift Station and increased flow in the existing gravity lines at Sierra Point. These projects helped to mitigate the hydraulic deficiencies identified in the 2017 Sanitary Sewer Master Plan Update.
C. Prioritized Preventive Maintenance
The City's Prioritized Preventive Maintenance program consists of five main components: 1) annual chemical foaming for root control, 2) annual cleaning for known sewer main segments with blockage issues, 3) investigation and resolution of customer complaints, 4) lift station maintenance, and 5) keeping maintenance activity records. Each of these components is described in more detail, as follows, along with plans for improvements:
Root Control: City staff chemically treat approximately 16 sanitary sewer main locations quarterly. As new areas of root intrusion are identified, City crews add them to the list for quarterly chemical root control. The City currently uses "Root-X" in its chemical root control program. Maintenance staff initiate CCTV inspections for line sections scheduled for chemical root control in advance to determine if root control is effective or if adjusting the frequency, additional volume of chemical used, or mechanical cleaning is needed to control root growth.
Sewer Main CCTV Inspection Program: City staff have continued an ongoing CCTV inspection program with the intention of shifting the City’s sanitary sewer system maintenance from reactive to proactive. Staff can inspect 1/3 of the gravity system with CCTV annually. In addition to identifying areas needing grit and root removal, the high frequency CCTV inspections and cleaning schedule help to identify sections of main to repair or replace. The crew has utilized CCTV to inspect over 28,000 linear feet (LF) of sewer main annually.
Sewer Cleaning: The CCTV inspection program allows the City to add additional line sections to a list of locations that need attention once a year or more, which has led to a more proactive sewer cleaning program.
As the City crews perform CCTV inspections of the City’s gravity sewer mains and manholes throughout the year, each CCTV inspection is saved as a PDF video report with condition assessment, photos and distances of issues within the pipe, and notes regarding any issues at the manhole. The pipe sections are rated at the time of inspection, and their inspection frequency is based upon this rating. These reports are then added to the maintenance program spreadsheets. A table of this CCTV Inspection Rating System is included below.
City of Brisbane – Sewer System Management Plan 13
Sanitary Sewer CCTV Inspection Rating System
POSM
Rating
Inspection
Frequency Determining Factors Cleaning
1 Biennial No observed problems
Zero to minimal roots, cracks, offsets, or bellies None 2 Annual Minimal roots, cracks, offsets, or bellies As needed 3 Biannual Moderate to heavy roots, cracks, offsets or bellies Cleaning required
4 Biannual Moderate to heavy roots, cracks, offsets or bellies Pipe Section added to CIP list
Cleaning
required
5 Continual
Significantly damaged pipe
Immediate Supervisor notification
Continual observation until repair completed
Cleaning
required
Investigation and Resolution of Complaints: When customers contact the City with complaints about sewer issues, appropriate staff personnel are promptly dispatched to the location to investigate. If the blockage is between the building and the mainline, City crews inform the property owners of their responsibility to contact a plumber to assess and fix the problem. (The property owner owns and is responsible for maintaining the sewer lateral from the property structure up to and including the connection at the City’s sewer main.) Lift Station Maintenance: The City currently owns and operates three sewer lift stations.
City crews perform regular maintenance at all stations on a prioritized schedule, as well as a fourth lift station servicing the City’s Fire Station. The City's main lift station, the Valley Drive Lift Station, has a detailed operations and maintenance manual that City crews use to schedule maintenance activities. The City also contracts for annual standby generator maintenance at each of the four lift stations.
Keeping Maintenance Records: City crews track locations and details of sewer maintenance activities using Mobile MMS, a computerized maintenance management system (CMMS).
Pertinent information is stored in the Public Works Database for future review and retrieval.
Plans for Improvement: City staff plan to make the following improvements to the Prioritized Preventive Maintenance program:
1. Schedule additional sewer main CCTV inspections and cleaning on an annual basis, to increase the overall percentage of the City's system that is regularly cleaned; and
2. Continue to develop improved electronic and paper systems for tracking sewer maintenance activities to provide enhanced analysis and reporting capabilities.
D. Scheduled Inspections and Condition Assessment
As part of the 2017 Sanitary Sewer Master Plan Update, the City identified and prioritized structural deficiencies for its collection system and implemented a Capital Improvement Program of prioritized short-term and long-term actions. The assessment of structural deficiencies was based on video surveys of approximately 42,000 linear feet of sewer line and inspections of all manholes through the City’s Sewer Main CCTV Inspection Program, and flow modeling to
City of Brisbane – Sewer System Management Plan 14
evaluate hydraulic deficiencies. Uniform condition assessment criteria were applied during review of the video inspections to determine deficiency ratings.
The City has conducted a flow monitoring study to evaluate rainfall induced infiltration and inflow (I&I) and to establish appropriate peak flow criteria for sizing wastewater facilities. The study will help to measure the degree to which I&I occurs across the City (utilizing smoke testing), calibrate the City’s sanitary sewer model, and prioritize future system assessment and rehabilitation efforts.
City crews perform station checks at each of the City's three sewer lift stations, as well as the Fire Department’s lift station, on a daily basis to ensure proper operation and identify any unusual operating characteristics. Sewer flow rates from central Brisbane (primarily residential with some commercial) are tracked with an ultrasonic transducer, and pumped flows from the Valley Drive Lift Station are tracked via magnetic flowmeters on the two discharge lines. City crews monitor these flows on a daily basis, noting and investigating any anomalous readings.
E. Contingency Equipment and Replacement Inventories
The following describes critical contingency equipment for the City's sewer system and lift stations:
Valley Drive Lift Station: This station utilizes four submersible non-clog sewage pumps, two of which are 50 horsepower and two 150 horsepower. Both sets of pumps discharge through two separate force mains, which allows for ongoing operation if one force main becomes non-operational. The two force mains also have a valved interconnection, which allows either set of pumps to discharge to either force main to allow maximum maintenance flexibility. The submersible pumps include thermal and moisture intrusion alarms to protect the pumps from mechanical failure, and various pressure and flow rate alarms will automatically shut down pumps in the event of a problem. This station has a 450-kilowatt propane-fired standby generator with an automatic transfer switch that powers the entire station in the event of a power failure. Two 500-gallon propane tanks fuel the standby generator, and City crews keep the tanks at least half-full at all times. The standby generator exercises on a weekly basis. A primary ultrasonic transducer, with a secondary backup, controls pump operation at this station. There are also backup mechanical floats to activate alarms in the event both transducers fail. The original channel grinder was replaced with a Franklin Miller Dimminutor channel grinder, which is capable of processing 13.8 million gallons a day of wastewater.
Sierra Point Lift Station (Lift Station #4): This station utilizes three submersible non-clog sewage pumps, all of which are 23 horsepower. The wet well also contains two Franklin Miller Dimminutor channel grinders. This station has a 60-kW standby diesel-powered generator with a 380-gallon fuel tank to keep the station operational in the event of a power failure, which is exercised on a weekly basis. A pressure level transmitter controls pump operation and there are backup floats switches if the transmitter fails. In 2020, the entire lift station was upgraded to meet the demands of the new commercial developments at Sierra Point, which included upgrades such as a new wet well, piping, instrumentation, and a landfill gas detection and monitoring system.
City of Brisbane – Sewer System Management Plan 15
Harbormaster Lift Station (Lift Station #1): This station utilizes two submersible selfcleaning semi-open channel impeller pumps. This station has an 80-kW standby dieselpowered generator with a 300-gallon fuel tank that will operate the entire station in the event of a power failure. The station exercises the generator on a monthly basis. The pumps, wet well piping, isolation valves, and the submerged flex hoses for this station were replaced over time. The station has a pressure transducer for pump operation and backup mechanical floats for alarms and pump control.
Fire Station No. 81 Lift Station (Lift Station #5): The City of Brisbane’s Fire Station No. 81, located at 3445 Bayshore Boulevard, is managed by North County Fire Authority (NCFA).
This fire station contains a wet well with two pumps operated by pressure transducers with backup mechanical floats for alarms and pump control. The City of Brisbane Public Works Department performs routine inspections and cleaning of this station and equipment, but repairs and equipment upgrades are the responsibility of NCFA.
Contingency Equipment: City crews maintain multiple portable sump pumps and generators for use during a sewer emergency. The City has a 2,500-gallon Vactor truck that is utilized for capturing and containing any sewer overflow volume, as well as cleanup and line clearing activities with a new truck. This truck has a small wheelbase and a tighter turning radius to help navigate the City’s narrow and twisty streets. City crews maintain an inventory of extra pipes of varying diameters and materials as well as necessary couplings and fittings to allow prompt repair of most gravity sewer failures. An equipment inventory list can be found in Appendix J.
F. Training
City staff participate in regular ongoing training activities, both in-house and through outside vendors. In-house safety training occurs on a bi-weekly basis, with some of the training seminars specific to collection systems management. The Public Works Supervisor possesses a Collection System Maintenance (CSM) Grade 2 certificate as issued by CWEA. Other Public Works employees have CSM Grade 1 and 2 certificates as well. CWEA certification requires biannual submittal of 12 contact hours of training related to Collection Systems Maintenance.
Crew members attend seminars by CWEA and other outside entities to accumulate contact hours.
City staff also participate in on-the-job training, where crew members are cross trained on different aspects of municipal maintenance. This helps ensure all crew members are able to respond to a variety of emergency situations. Certain crew members are also required to maintain Class B driver's licenses with air and tanker endorsements in order to operate the Vactor truck. A list of staff training can be found in Appendix J.
G. Outreach to Plumbers and Building Contractors
The City of Brisbane, as a member of the Bay Area Clean Water Agencies (BACWA), has access to plumber outreach materials if necessary and will evaluate sending materials to local plumbers. The City also maintains a list of qualified contractors for public projects, which is updated annually.
City of Brisbane – Sewer System Management Plan 16
Element 5 – Design and Performance Provisions
A. Standards for Installation, Rehabilitation, and Repair The City has identified minimum design and construction standards and specifications for installation of new sewer systems. The City's design standards are included as Appendix D in this document. The City also has construction specifications for installation of new sewers via pipe bursting or reaming from two completed sewer rehabilitation capital improvement projects.
B. Standards for Inspection and Testing of New and Rehabilitated Facilities The City has identified minimum design and construction standards and specifications for rehabilitation and repair of existing systems. The City's standards are included as Appendix D in this document. Inspection of new and rehabilitated facilities is performed by the Public Works Inspector in the field during and at the completion of construction. Depending on the situation, inspections vary from visual inspections to air/water pressure testing, mandrel testing, or video inspection. For City capital improvement projects, testing requirements are called out in the construction specifications, and typically include air testing, mandrel testing, and video inspection for sewer mains and water leakage testing for manholes.
Design standards and specifications will be periodically reviewed by City staff to ensure the industry’s current best practices are considered, and to confirm if any updates are necessary.
City of Brisbane – Sewer System Management Plan 17
Element 6 – Spill Emergency Response Plan
A. Staff Notification
Sanitary sewage spills (i.e., discharges of sewage from any portion of a sanitary sewer system due to a sanitary sewer system spill, operational failure, and/or infrastructure failure) are typically reported in one of two ways in the City of Brisbane:
1. Observed and reported directly to City staff by a member of the public, another agency, or City crews during working hours
2. Observed and reported by a member of the public or another agency to the police department during non-working hours
During Regular Hours:
1. The Public Works Administrative Assistant will make note of the time reported, the name and contact information of the reporting party, and location and details of the spill.
2. The Administrative Assistant will immediately notify the Public Works Supervisor or Utility Team Leader and provide the recorded information.
3. The Public Works Supervisor or Utility Team Leader will then dispatch appropriate field crews to the site.
4. Once City crews have responded to the site and assessed the situation, they will report back to the Public Works Supervisor or Utility Team Leader, who will then notify the Deputy Director, Public Works Department - Utilities with the details of the spill.
During Non-Working Hours:
1. Spills reported to the police or fire departments, dispatch will record the time reported, the name and contact information of the reporting party, and location and details of the spill.
2. The information will be relayed to the Public Works Supervisor or Utility Team Leader or directly to the on-call personnel if the Public Works Supervisor or Utility Team Leader cannot be reached.
3. The Public Works Supervisor or Utility Team Leader will relay the details of the spill and dispatch the on-call personnel to the scene.
4. The Deputy Director, Public Works Department - Utilities will be notified on the next working day unless the spill requires reporting within 2 hours, in which case, notification will occur as soon as feasible after the spill is corrected.
To minimize spill impacts, the main priorities shall be protection of public health and the environment. For all spills, if there is potential for public contact with sanitary waste, the affected area shall be cordoned off to prevent public access, using traffic barricades, warning
City of Brisbane – Sewer System Management Plan 18
tape, cones, signs, etc. All spill volume that is recoverable shall be contained and pumped back into the sanitary sewer system, either with trash pumps or a Vactor truck. If the spill reaches the storm drain system, a downstream catch basin or storm system manhole shall be plugged with sandbags or inflatable drain plugs, and the contained volume pumped out or vacuumed with the Vactor truck. Impacted areas on the surface shall be washed down, with all wash water contained and returned to the sanitary sewer system. Impacted areas, including the storm drain system, shall be cleaned and disinfected, as appropriate, to eliminate any public health threats.
Should any spill volume visibly impact surface waters, the Water Quality Technician will pursue follow-up sampling and City staff will pursue mitigation efforts in coordination with appropriate regulatory agencies.
A copy of the full Brisbane Spill Emergency Response Plan and Spill Documentation Packet can be found in Appendix G.
In 2015 City Staff developed and implemented a set of Lift Station Emergency Response Plans, to be stationed at all the City maintained Lift Stations. These plans include maps, retention times, emergency contacts, and site-specific response plans. The purpose of these Emergency Response Plans is to mitigate any impact on the local waterways from a failure at any of the City’s Lift Stations. These Lift Station Emergency Response Plans can be seen in Appendix H.
B. Crew Response
The following steps outline the typical spill response procedures:
1. Perform Initial Assessment
a. Conduct quick visual volume assessment (gallons) with photo documentation. b. Call for additional backup support, as required.
c. Identify spill destination (catch basin, infiltrate into ground, gutter, etc.). d. Determine equipment needs for restricting public access, traffic control, spill containment and recovery, clearing blockage, and cleanup. e. If spill appears to meet the following criteria, contact Public Utilities Supervisor/Team Leader; or contact Deputy Director, Public Works Department – Utilities immediately:
i. All discharges of sewage of any volume resulting from a failure in the Cityowned and operated sanitary sewer system that:
Result in a discharge to a surface water body and/or reach a drainage channel tributary, including a surface water body that contains no flow or volume of water.
City of Brisbane – Sewer System Management Plan 19
Discharge to a storm drainpipe that was not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly.
2. Preliminary Response
a. If there is potential for public contact with spill material, isolate the area using barricades, cones, warning tape, etc.
b. Set up appropriate traffic control for City staff and public protection.
3. Containment/Recovery
a. Take photo documentation of containment/recovery efforts. b. If spill is ongoing, or if some or all of flow can be captured, contain flow by plugging catch basin outlets, covering catch basins, using sandbags, plugging downstream storm drain manhole outlets, excavating for containment, etc. c. Set up Vactor equipment or trash pumps to recover spill volume, as appropriate.
4. Correct Spill
a. Set up equipment at dry cleanout or manhole location, follow standard procedures for cleaning.
b. Capture and remove material flowing from blockage, assess material captured to determine cause of spill.
5. Cleanup
a. Take photo documentation of cleanup activities.
b. Collect solid and liquid materials from impacted areas including the drainage conveyance system.
c. Wash and disinfect area only if all wash water and disinfectant can be captured and removed with pumps or Vactor.
d. Clean and disinfect impacted storm drain lines and catch basins.
6. Monitor and Document Incident.
a. Document spill location and spread
i. Take pictures (digital) and record the GPS coordinates for the location where the spill originated. For multiple appearance points of a single spill event, take the GPS coordinates for the points closest to the spill origin. ii. Take pictures for the drainage conveyance system entry locations; location(s) of discharge into surface waters, as applicable; extent of spill spread; and the location(s) of clean up.
City of Brisbane – Sewer System Management Plan 20
b. Make final estimate of spill volume using method outlined in Appendix G. c. Monitor receiving water for spills discharging to surface waters i. Make estimate of spill travel time to the receiving water. ii. For spills entering a drainage conveyance system, make estimate of spill travel time from the point of entry into the drainage conveyance system to the point of discharge to the receiving water.
iii. Make estimate of the spill volume entering the receiving water using method outlined in Appendix G.
iv. Take pictures (digital) of waterbody bank erosion, floating matter, water surface sheen (potentially from oil and grease), discoloration of receiving water, and impacts to the receiving water.
d. For spills in which an estimated 50,000 gallons or greater are discharged into a surface water, perform water quality sampling and analysis per Appendix F and as described below.
e. Fill out spill field report, tracking chronology of event, including: date, location, time call received, time crew arrived, time spill ceased, time cleanup completed, estimate of total volume, estimate of volume contained and recovered for discharge to sanitary sewer, estimate of volume remaining within the storm drain pipe, estimate of volume reaching water bodies, if known, identify probable cause of spill, notifications made, pipe material and age at the failure location.
7. Provide documentation and incident results to Public Works Utility Supervisor/Team Leader.
C. Spill Categories, Notification, and Reporting
The following reporting requirements are based on Amending Monitoring and Reporting Program 2006-0003 in the Statewide General Waste Discharge Requirements for Sanitary Sewer Systems and amended in Order WQ2022-0103-DWQ:
1. Spill Categories
a. Category 1 - A spill of any volume of sewage from or caused by a City-owned and operated sanitary sewer system that results in a discharge to:
i. A surface water, including a surface water body that contains no flow or volume of water; or
ii. A drainage conveyance system (i.e., storm drain) that discharges to surface water when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly. Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless
City of Brisbane – Sewer System Management Plan 21
the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.
A spill from a City-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the City shall report all Category 1 spills as described herein. b. Category 2 – A spill of 1,000 gallons or greater, from or caused by the City’s sanitary sewer system that does not discharge to a surface water. c. Category 3 – A spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by the City’s sanitary sewer system that does not discharge to a surface water.
d. Category 4 – A spill of less than 50 gallons, from or caused by the City’s sanitary sewer system that does not discharge to a surface water. e. Private Lateral Sewage Discharges – Sewage discharges that are caused by blockages or other problems within a privately owned sewer lateral may be voluntarily reported to the California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database.
2. Spill Notification
Effective immediately, the following is notification requirement for sanitary sewer spills that discharge to a drainage channel or surface water, including from a City owned and/or operated lateral.
a. Category 1 Spill – 1,000 gallons and greater discharged to drainage channel or surface water
i. Notify Cal OES (800-852-7550) within 2 hours after
knowledge of the discharge;
notification is possible;
notification can be provided without substantially impeding cleanup or other emergency measures.
ii. Note the list of what Cal OES might ask when you call; iii. Obtain a notification control number;
iv. Following the initial notification to Cal OES and until such time that the Discharger certifies the Spill Report in the CIWQS Sanitary Sewer System Database, the Discharger shall provide updates to Cal OES regarding substantial changes to the estimated spill volume, estimated volume discharged into the surface water or a drainage system, and any substantial changes to known impacts to receiving water(s) and beneficial uses.
City of Brisbane – Sewer System Management Plan 22
In order to comply with these new notification requirements, it may be necessary for City staff on the maintenance crew to perform the necessary notifications, especially in cases where spills occur after hours. The contact information for the required notification is as follows:
California State Office of Emergency Services
(800) 852-7550
When calling this number be prepared to report the following:
v. Identity of caller and direct return phone number.
vi. Estimated spill volume (gallons).
vii. If ongoing, estimated spill discharge rate from system (gallons per minute). viii. Estimate discharge rate (gallons per minute) directly into surface water or a drainage conveyance system.
ix. Spill Incident Description:
x. Brief narrative of spill event.
xi. Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks.
xii. On-scene point of contact for additional information (name and cell phone number).
xiii. Date and time Discharger became aware of the spill. xiv. Name of sanitary sewer system agency causing the spill. xv. Spill cause or suspected cause (if known).
xvi. Indication of whether the spill has been contained and the amount of the spill has been contained, if applicable.
xvii. Name of receiving water body receiving or potentially receiving discharge. xviii. Description of water body impact and/or potential impact to beneficial uses. b. Spill of 50 gallons and greater from Individual Lateral For each individual spill that is 50 gallons or greater from the City’s owned and/or operated laterals, the City shall notify the San Francisco Bay Regional Water Quality Control Board (510-622-2369 or [email protected]), within three (3) business days of the knowledge of the discharge.
3. Receiving Water - Water Quality Sampling and Analysis:
City of Brisbane – Sewer System Management Plan 23
Appendix F includes the sampling and analytical methodology for the implementation of the required water quality sampling and analysis to assess the impacts from spill in which an estimated 50,000 gallons or greater are discharged into a surface water. The Water Quality Monitoring Plan included in Appendix F includes:
a. Sampling and Analytical Methodologies
b. Methodology to account for spill travel time in the surface water and scenarios where monitoring may not be possible.
c. Required water quality analyses for ammonia and bacterial indicators to be performed by an accredited or certified laboratory.
d. Required monitoring instruments and devices used to implement the spill Water Quality Monitoring Program and instructions to properly maintain and calibrate instruments and devices.
e. The minimum required water quality sampling to be performed within 48 hours of becoming aware of the spill for:
i. Ammonia
ii. Bacterial Indicator(s)
4. Spill Reporting Requirements
a. Category 1 Spill – Submit draft report within three (3) business days of becoming aware of the spill and certify within 15 calendar days of spill end date. Enter data into the CIWQS Sanitary Sewer System Database
(http://ciwqs.waterboards.ca.gov/), certified by enrollee’s Legally Responsible Official.
b. Category 2 Spill – Submit draft report within three (3) business days of becoming aware of the spill and certify within 15 calendar days of the spill end date. Enter data into the CIWQS Sanitary Sewer System Database
(http://ciwqs.waterboards.ca.gov/), certified by enrollee’s Legally Responsible Official.
c. Category 3 Spill– Submit certified report within thirty (30) calendar days of the end of the month in which the spill occurred. Enter data into the CIWQS Sanitary Sewer System Database (http://ciwqs.waterboards.ca.gov/), certified by enrollee’s Legally Responsible Official.
d. Category 4 Spill – Submit certified report within thirty (30) calendar days of the end of the month in which the spill occurred. Enter data into the CIWQS Sanitary Sewer System Database (http://ciwqs.waterboards.ca.gov/), certified by enrollee’s Legally Responsible Official
City of Brisbane – Sewer System Management Plan 24
e. Spill Technical Report – Submit within 45 calendar days after the end date of any Category 1 spill in which 50,000 gallons or greater are discharged into a surface water. Enter report into the CIWQS Sanitary Sewer System Database (http://ciwqs.waterboards.ca.gov/), certified by enrollee’s Legally Responsible Official.
f. Water Quality Monitoring – Conduct water quality sampling within 48 hours after initial spill notification for Category 1 spills in which 50,000 gallons or greater are spilled to surface waters. Water quality results are required to be uploaded into the CIWQS Sanitary Sewer System Database (http://ciwqs.waterboards.ca.gov/), certified by enrollee’s Legally Responsible Official.
g. Certification of “No Spill” or “Category 4 Spills Only” – Certify that only Category 4 Spills or no spills occurred within 30 calendar days of the end of each calendar month in the online CIWQS Sanitary Sewer System Database. h. Annual Report (Previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) - Update and certify previous year’s Annual Report by April 1st of each year directly in the CIWQS Sanitary Sewer System Database. i. CIWQS Sanitary Sewer System Database Unavailability - In the event that the Sanitary Sewer System Database is not available, the City must fax or e-mail all required information to the San Francisco Bay Regional Water Quality Control Board office (510-622-2369) in accordance with the time schedules identified herein. In such event, the City must also enter all required information into the CIWQS Sanitary Sewer System Database when the database becomes available. j. Amended Certified Spill Reports – The City may update or add additional information to a certified spill report within 90 calendar days after the spill end date by amending the report or by adding an attachment to the spill report in the CIWQS Sanitary Sewer System Database.
k. Annual Certified Spill Reporting of Lateral Spills– Upload and certify a PDF report of all spills from the City owned and/or operated laterals occurred by February 1st after the end of each calendar year to the online CIWQS Sanitary Sewer System Database.
D. Spill Online Reporting
The City at a minimum, will report the following mandatory information prior to finalizing and certifying a Spill report for each category of spill:
1. Draft Category 1 Spill:
a. Spill Contact Information: Name and telephone number of enrollee contact person who can answer specific questions about the spill being reported.
City of Brisbane – Sewer System Management Plan 25
b. Spill Location Name.
c. Date and time the enrollee was notified of, or self-discovered, the spill. d. Operator arrival time.
e. Estimated spill start date and time.
f. Date and time the enrollee notified the Cal OES, and the assigned control number. g. Description, photographs, and GPS coordinates of the spill origin. If a single spill event results in multiple appearance points, provide GPS coordinates for the appearance point closest to the failure point and describe each additional appearance point in the spill appearance point explanation field.
h. Estimate of total spill exiting the system.
i. Whether or not the spill reached a municipal separate storm drain system. j. Whether or not the total spill volume that reached a municipal separate storm drain system was fully recovered.
k. Description of the storm drain system(s) and photographs of storm drain system entry point(s).
l. Estimate of the total spill volume fully recovered from a storm drain and spill remaining in the storm drain system(s).
m. Whether or not the spill reached surface water, a drainage channel, or entered and was discharged from a drainage structure.
n. Estimate of the spill volume that reached surface water, a drainage channel, or was not recovered from a storm drain.
o. Estimate of the total spill volume recovered.
p. Description and photographs of all discharge point(s) into the surface waters.
2. Certified Category 1 Spill:
a. All information previously provided in Draft Category 1 Spill. b. Description of spill destination(s).
c. GPS coordinates that represent the full spread and reach of the spill, if available. d. Spill end date and time.
e. Spill causes (mainline blockage, roots, etc.).
f. Spill failure point (main, lateral, etc.).
g. Whether or not the spill was associated with a storm event.
City of Brisbane – Sewer System Management Plan 26
h. Description of spill corrective action, including steps planned or taken to reduce, eliminate, and prevent reoccurrence of the spill; and a schedule of major milestones for those steps.
i. Description of spill response activities.
j. Spill response completion date.
k. Detailed narrative of investigation and investigation findings of spill causes. l. Whether or not there is an ongoing investigation, the reasons for the investigation and the expected date of completion.
m. Whether or not the spill was located within 1,000 feet of a municipal water intake or municipal groundwater well.
n. Name and type of surface water(s) impacted.
o. Whether or not aquatic life was impacted, and description of impacts if applicable. p. Whether or not a beach closure occurred or may have occurred as a result of the spill, and number of days closed/restricted.
q. Whether or not health warnings were posted as a result of the spill. r. Name of beach(es) closed and/or impacted. If no beach was impacted, NA shall be selected.
s. If water quality samples were collected, identify sample locations and the parameters the water quality samples were analyzed for. If no samples were taken, NA shall be selected.
t. If water quality samples were taken, identify which regulatory agencies received sample results (if applicable). If no samples were taken, NA shall be selected. u. Description of methodology(ies) and type of data relied upon for estimations of the spill volume discharge and recovered.
v. Description of methodology(ies) and type of data relied upon for estimations of the spill start and end time.
w. Description of the spill impacts.
x. Description of pipe/infrastructure material at the failure location and estimate of pipe/infrastructure material age.
y. Upon Spill Certification, the CIWQS Sanitary Sewer System Database will issue a final spill event identification (ID) number.
3. Spill Technical Report for Individual Category 1 Spill equal to 50,000 Gallons and greater
City of Brisbane – Sewer System Management Plan 27
The City shall submit a Spill Technical Report in the CIWQS Sanitary Sewer System Database within 45 calendar days of the spill end date for any Category 1 spill in which 50,000 gallons or greater are spilled to surface waters. This report, which does not preclude the Water Boards from requiring more detailed analyses if requested, shall include at a minimum, the following:
a. Complete and detailed explanation of how and when the spill was discovered. b. Take pictures of the spill origin, the extent and reach of the spill, drainage conveyance system entrance and exit, receiving water, and post-cleanup site conditions.
c. Diagram showing the spill failure point, appearance point(s), and final destination(s). d. Detailed description of the methodology employed and available data used to calculate the volume of the spill and, if applicable, the spill volume recovered. e. Detailed description of the cause(s) of the spill.
f. Description of the pipe material, and estimate of the pipe material age, at the failure location.
g. Description of the spill impact (s).
h. Copies of original field crew records used to document the spill. i. Historical maintenance records for the failure location. j. Chronological narrative description of all actions taken by enrollee to terminate the spill.
k. Explanation of how the SSMP Spill Emergency Response plan was implemented to respond to and mitigate the spill.
l. Final corrective action(s) completed and a schedule for planned to be completed corrective action(s), including:
i. Local regulatory enforcement action taken against an illicit discharge in response to this spill, as applicable.
ii. Identifiable system modifications, and operation and maintenance program modifications needed to prevent repeated spill occurrences. iii. Necessary modifications to the Emergency Spill Response Plan to incorporate lessons learned in responding to and mitigating the spill. m. Description of all water quality sampling activities conducted including analytical results and evaluation of the results.
n. Detailed location map illustrating all water quality sampling points.
City of Brisbane – Sewer System Management Plan 28
o. Description of short-term and long-term impact(s) to beneficial uses of the surface water.
4. Draft Category 2 Spill:
a. At a minimum, report on Items a-l and Item o of Draft Category 1 Spill reporting. b. Estimate of spill volume discharged to a groundwater infiltration basin or facility, if applicable.
5. Certified Category 2 Spill:
a. At a minimum, report on Items a-l and Item o of Draft Category 1 Spill reporting and Items b-m and Items u-y of Certified Category 1 Spill reporting.
6. Certified Category 3 Spill:
a. At a minimum, report on Items a-e, Items g-l, and Item o of Draft Category 1 Spill reporting, and Items b-l of Certified Category 1 Spill reporting. b. Estimate of spill volume discharged to a groundwater infiltration basin or facility, if applicable.
E. Reporting to Other Regulatory Agencies
The City shall also report spill events to other regulatory agencies pursuant to California state law.
1. The City shall report any discharge of untreated wastewater or other waste in or on any waters of the State, or discharged in or deposited where it is, or probably will be, discharged in or on any surface waters of the State to San Mateo County Health (650-372-6200) officials in accordance with California Health and Safety Code Section 5410 et seq.
F. Record Keeping Requirements:
The following records shall be maintained by the enrollee for a minimum of five (5) years and shall be made available for review by the Water Boards during an onsite inspection or through an information request:
1. General Records: The enrollee shall maintain records to document compliance with all provisions of the SSS WDRs and the MRP for each sanitary sewer system owned including any required records generated by an enrollee’s sanitary sewer system contractor(s).
2. Spill Records: The enrollee shall maintain records for each spill event, including but not limited to:
a. Complaint records documenting how the enrollee responded to all notifications of possible or actual spill, both during and after business hours, including complaints
City of Brisbane – Sewer System Management Plan 29
that do not result in spill. Each complaint record shall, at a minimum, include the following information;
i. Date, time, and method of notification.
ii. Date and time the complainant or informant first noticed the spill. iii. Narrative description of the complaint, including any information the caller can provide regarding whether or not the complainant or informant reporting the potential spill knows if the spill has reached surface waters, drainage channels or storm drains.
iv. Follow-up return contact information for complainant or informant for each complaint received, if not reported anonymously.
v. Final resolution of the complaint.
b. Records documenting steps and/or remedial actions undertaken by enrollee, using all available information, to comply with section D.7 of the SSS WDRs. c. Records documenting how all estimate(s) of volume(s) discharged and, if applicable, volume(s) recovered were calculated.
d. Records documenting system operation, maintenance and program modifications implemented to prevent repeated spill occurrences at the same spill locations.
3. Records documenting all changes made to the SSMP since its last certification indicating when a subsection(s) of the SSMP was changed and/or updated and who authorized the change or update. These records shall be attached to the SSMP.
4. Electronic monitoring records relied upon for documenting spill events and/or estimating the spill volume discharged, including, but not limited to records from:
a. Supervisory Control and Data Acquisition (SCADA) systems b. Alarm system(s)
c. Flow monitoring devices(s) or other instruments(s) used to estimate wastewater levels, flow rates and/or volumes.
G. Certification
1. All information required to be reported into the CIWQS Sanitary Sewer System Database shall be certified by a person designated as a Legally Responsible Official (LRO).
2. Any designated person shall be registered with the State Water Board to certify reports in accordance with the CIWQS protocols for reporting.
City of Brisbane – Sewer System Management Plan 30
3. Any enrollee employee may enter draft data into the CIWQS Sanitary Sewer System Database on behalf of the enrollee if authorized by the LRO and registered with the State Water Board.
4. A registered designated person (i.e., and LRO) shall certify all required reports.
H. Staff Field Exercises
City staff conduct field exercises to maintain consistency with all SERP procedures. Field exercises are conducted on a regular basis to ensure City staff are prepared and aware of procedures for a spill of any volume.
City staff conduct “mock” field exercises that incorporate all steps of the SERP procedure. The Public Works Supervisor determines the type of field exercise that will be conducted by City staff.
City of Brisbane – Sewer System Management Plan 31
Element 7 – Sewer Pipe Blockage Control Program
The City currently implements a Sewer Pipe Blockage Control Program to reduce any potential blockages caused traditionally by fats, oils, grease (FOG), with the addition of debris and rags.
Although FOG has not been found to be a significant contributor to SSOs in the City of Brisbane, the City will implement the Sewer Pipe Blockage Control Program as follows:
A. Source Identification:
The source of the highest-concentration of FOG discharge to the sewer system are likely from the City’s food service facilities. There are typically between 30 and 40 food service facilities in Brisbane at any one time. These facilities are primarily located in “the Village” area of Brisbane along Old County Road and in the commercial district on Visitacion Avenue. Additional facilities are scattered in Crocker Industrial Park and at Sierra Point in association with the hotels and office buildings.
Other potential FOG sources may also be from residences in central Brisbane or the Northeast Ridge neighborhoods.
B. Source Control:
Source control measures for food service facilities are primarily accomplished through San Mateo County’s Environmental Health Department inspection program. County health inspectors enforce operation and maintenance of grease traps and ensure proper management of food service waste. In addition, if an SSO occurs in a residential or commercial area due to FOG buildup, City staff will distribute door hangers alerting residents that grease was found in sewer lines in their area and directing them to properly manage their FOG.
The installation of grease removal units is required in all new restaurants and in tenant improvements of existing restaurants. Installation of a grease removal unit is also required in all new commercial and industrial food-handling facilities and in tenant improvements of existing commercial and industrial food-handling facilities.
C. Inspection and Maintenance:
The City relies on the County Health inspectors for food service facility inspections. The County inspectors are required to inspect all food service facilities on a regular basis (at least annually) and can provide enforcement on issues related to FOG management and disposal. County inspectors will notify City staff if there is a problem at a particular facility requiring additional action.
City staff have identified various locations throughout the City that may be potential “hot spots” for FOG and have implemented cleaning schedules to mitigate and prevent any potential sewer pipe blockages.
City of Brisbane – Sewer System Management Plan 32
D. Legal Authority:
The City has adequate legal authority to prohibit discharges of FOG to the collection system as detailed in the Brisbane Municipal Code. Relevant sections of the Code are included in Appendix E.
In addition, the City’s municipal code adopts San Mateo County’s environmental health code as the applicable regulations for food service facilities.
City of Brisbane – Sewer System Management Plan 33
Element 8 – System Evaluation, Capacity Assurance and Capital Improvements
A. System Evaluation and Condition Assessment
The City's Sanitary Sewer System Master Plan, which was developed in 2003 and updated in 2017, evaluated the existing sewer system assets, updated the City’s sewer system hydraulic model, and provided recommended rehabilitation projects based on the findings. Utilizing a regular CCTV inspection program, the City has been able to identify and prioritize several sewer system replacements and repairs over the years, which has helped to develop future capital improvement projects based on condition assessment recommendations.
The City has also conducted a wastewater flow monitoring study to measure the degree and general location that rain induced infiltration and inflow (I&I) enters the City’s sanitary system.
This I&I study helps to establish baseline sanitary sewer flows, identifies the peak flows during rainfall events and the impact it has on sewer capacity, and prioritizes specific sections of the sewer system that need further condition assessment, with follow up methods such as smoke testing. This work helps to identify and address weaknesses in both the public and private sewer systems.
B. Capacity Assessment and Capital Improvement Plan
The City's Sanitary Sewer System Master Plan provided a capacity evaluation of the sewer system. These evaluations were based on hydraulic modeling of the sewer system using SewerCAD software. Modeling was done based on escalating peaking factors applied to base flow estimates for future (build-out) flow conditions. Flow estimates were prepared using peaking factors of 3, 5, 7, and 9. City staff decided to use a peaking factor of 5 to simulate design wet weather events, and used the following flow depth criteria for determining which gravity sewers were hydraulically deficient:
When the peak flow depth exceeds one-half full for pipelines 10-inches in diameter or less
When the peak flow depth exceeds two-thirds full for pipelines 12-inches in diameter or greater
A summary of the City’s gravity sewer assets from the Sanitary Sewer Master Plan can be found in Appendix K.
The City’s Sanitary Sewer Master Plan also presented recommended capital improvement programs for mitigating both hydraulic and structural deficiencies in the City's sewer collection system. The City has corrected the hydraulic deficiencies identified in both the 2003 and 2017 Master Plans by upsizing existing six-inch diameter vitrified clay pipes to eight-inch diameter high density polyethylene pipe through trenchless rehabilitation processes (pipe bursting). The hydraulic deficiencies for the Sierra Point Lift Station, identified in the Master Plan, have been remedied and have allowed increased capacity in handling all future flows for the Sierra Point area. A copy of the City’s most recent Sanitary Sewer System Master Plan can be made available upon request
City of Brisbane – Sewer System Management Plan 34
Element 9 – Monitoring, Measurement, and Program Modifications The City will monitor implementation of SSMP elements and measure effectiveness of SSMP elements in reducing SSOs through annual review meetings with collection system staff. During these review meetings, the following performance indicators will be evaluated:
Number of SSOs in wet weather and dry weather
Total number of SSOs
Number of SSOs in each category
Total volume of SSOs
Total volume recovered
Net volume of SSOs (total minus recovered)
Total annual volume conveyed to wastewater treatment plant Net volume of SSOs compared to total annual volume conveyed (% conveyed) Number of SSOs caused by:
o Roots
o Grease/FOG
o Debris
o Pipe failure
o Pump station failure
o Capacity-limited pipe segment (no debris)
o Other
Number of locations with more than one SSO in the past year Average response time during business hours/outside of business hours Planned/unplanned cleaning/chemical root control (LF) Ratio of planned to unplanned cleaning/chemical root control (LF) Number of blockages in the past year
Number of blockages due to:
o Roots
o Grease/FOG
o Debris
o Other
City of Brisbane – Sewer System Management Plan 35
Number of customer complaints in the last year
Number of positive customer responses
At the annual review meetings, collection system staff will also go through the SSMP to ensure the information is current, including any updates to infrastructure, wastewater flow characteristics, new or modified operations and maintenance protocols, revised emergency response procedures, or changed organizational structure.
The main person on staff who is responsible for monitoring the effectiveness of the SSMP is the Deputy Director of Public Works - Utilities. This person will organize and oversee the annual review meetings with collection systems maintenance staff. After the annual review meeting, the Public Works Supervisor/Utility Team Leader will draft an annual review summary for the Deputy Director of Public Works - Utilities. Any SSMP modifications determined necessary during the annual review meeting will be detailed in the summary document. Minor SSMP modifications will be implemented by the Public Works Supervisor/Utility Team Leader.
Significant SSMP modifications will be reviewed and approved by the Public Works Director.
City of Brisbane – Sewer System Management Plan 36
Element 10 – Internal Audits
The City is required to conduct an internal audit of the SSMP on a triannual basis. The audit reviews the effectiveness of the SSMP and identifies if there are any deficiencies in the SSMP or maintenance processes that will need to be corrected. If updates or changes are required, the content and timeline to complete those changes are described in the audit form. The audit is conducted by City’s Public Works staff, including the engineering staff and field maintenance staff.
The most recent SSMP audit was completed and certified in October 2025, and a copy of the audit report can be found in Appendix L.
Following the audit, a comprehensive update of the SSMP will occur every 6 years in accordance with the Statewide WDR. All changes made to the SSMP are documented in the Change Log located in Appendix A.
City of Brisbane – Sewer System Management Plan 37
Element 11 – Communication Program
Public Education
The City has a link to the current SSMP on the main Sewer page of the City’s website. There is also a link to the Public Works Department with a note encouraging people to contact the City with any questions or concerns. Following is the link to that webpage. https://www.brisbaneca.gov/488/Sewer-Information
The City utilizes various media sources (utility bill inserts, weekly “Blast” updates, monthly STAR newsletters, social media) to inform utility customers of various topics including sanitary sewer collection system issues. City staff can also develop new web pages to cover specific topics such as Inflow & Infiltration (I/I) or FOG control.
Public Outreach Events
Day in the Park – This is an annual Event held in the City of Brisbane’s Community Park. The City of Brisbane’s Public Works Department has a booth where the Sanitary Sewer Field Crew has the ability to set up a demonstration that includes a mockup sewer lateral and information points. The booth is staffed by the Maintenance Utility Workers from 8:00am – 3:00pm. This provides the public a full day to question, provide feedback, and learn about the City’s Sanitary Sewer System. City Hall Office Hours – The City of Brisbane’s City Hall public walk-in hours are 8:30 AM – 4:30 PM, Monday through Thursday, and 8:30 AM – 12:30 PM on Fridays. City Hall Office Hours are subject to change.
Crew Interactions with the Public
The City’s Utility Maintenance workers regularly interact with the public during their daily activities. The crew is trained to handle all of these interactions with dignity and professionalism. If any of the public has questions or concerns that the crew members can’t answer, they are instructed to give out the business card for the City’s Public Works Department.
In the event of a spill that results in the closure of public areas, the City provides appropriate public notification signs and barricades to keep vehicle and pedestrian traffic away from contact with spilled sewage during spill response and cleanup.
City of Brisbane – Sewer System Management Plan 38
APPENDIX A: SSMP Revision Log
Date Element Description Changed By
8/31/2006 All Initial development of SSMP PW Staff
8/31/2007 5, 6, 7 Added Sections 5, 6, and 7 PW Staff
8/31/2008 8, 9, 10 Added Sections 8, 9, and 10 PW Staff 9/9/2009 5, Appx. B Updated Section 5 and Appendix B PW Staff 3/12/2010 All Minor modifications because of annual review PW Staff 9/27/2010 2 Minor contact information change PW Staff
2/22/2012 All Minor modifications because of annual review PW Staff 9/19/2013 All Minor updates because of Order WQ2013-0058 PW Staff 12/15/2015 All Minor updates PW Staff
12/8/2016 All Minor updates PW Staff
1/25/2018 All Minor updates PW Staff
3/4/2020 All Minor updates PW Staff
9/18/2020 All Minor updates PW Staff
9/2/2022 All Minor updates PW Staff
6/2/2023 3, Appx. D
& E
Updated Section 3 and Appendices D and E to
reflect Order WQ2022-0103 requirements
PW Staff
5/2/2026 Table of
Contents
Added List of Acronyms & Terms pages PW Staff
1 Renamed Element 1 to be consistent with WDR.
Added narrative introduction, regulatory context
descriptions, auditing requirements and
schedules, sewer system asset information, and a
map of the current sewer system as outlined in
WDR Objectives.
PW Staff
2 Renamed Element 2 to be consistent with WDR.
Updated current staff contact information.
Added section about the Legally Responsible
Official (LRO) and Data Submitters (DS), the
positions responsible for each of the specific
Elements of the SSMP, and the chain of
communications for spill reporting.
PW Staff
3 Renamed and moved Element 3 to be consistent
with WDR. Added an electronic link to the
City’s ordinances and a section for agreements
with other agencies.
PW Staff
4 Renamed and moved Element 4 to be consistent
with WDR. Updated text and added several
associated Appendices.
PW Staff
5 Renamed and moved Element 5 to be consistent
with WDR. Updated text and information.
PW Staff
6 Renamed and moved Element 6 to be consistent
with WDR. Updated text and added section for
staff field exercises.
PW Staff
City of Brisbane – Sewer System Management Plan 39
7 Renamed and moved Element 7 to be consistent
with WDR. Updated language to include rags
and debris.
PW Staff
8 Renamed Element 8 to be consistent with WDR.
Updated text and information. Added a list of
Brisbane’s gravity sewer assets and manholes as
an Appendix.
PW Staff
9 Renamed Element 9 to be consistent with WDR.
Updated text and information.
PW Staff
10 Renamed Element 10 to be consistent with
WDR. Updated text and information. Added
most recent Internal Audit as an Appendix.
PW Staff
11 Renamed Element 11 to be consistent with
WDR. Updated text and information.
PW Staff
Appendix Added several new appendices in correlation to the updated Elements.
PW Staff
City of Brisbane – Sewer System Management Plan 40
APPENDIX B: City of Brisbane Public Works Emergency Contact List Employee Title Office Cell
Maz Bozorginia Director of Public Works (415) 508-2131 (628) 219-2918 Jerry Flanagan Deputy Director of Public Works -
Utilities (415) 508-2137 (415) 321-0047
Diane Cannon Administrative Assistant (415) 508-2130 (415) 519-0748 Dustin Cohn Public Works Supervisor (415) 508-2105 (415) 629-1435 Kessel Crockett Public Works Sanitary System
Utility Team Leader (415) 508-2130 (628) 219-2917
Juan Higareda Maintenance Utility Worker (415) 508-2130 (415) 254-0490 Gustavo Lule Maintenance Utility Worker (415) 508-2130 (415) 298-2886 Daniel Hernandez Maintenance Utility Worker (415) 508-2130 (415) 215-8526 Devin Gutierrez Maintenance Utility Worker (415) 508-2130 (415) 205-6957 Graziano Sibillo Maintenance Utility Worker (415) 508-2130 (415) 696-1007 Chris Redfield Maintenance Utility Worker (415) 508-2130 (650) 291-8845 Jerome Strain Maintenance Utility Worker (415) 508-2130 (415) 645-3880
Varies Public Works 24 hour
On-Call Staff N/A (415) 286-0164
Bob Sage GIS Manager (415) 508-2121 (415) 203-8897
Greg Morris Public Works Inspector (415) 508-2130 (415) 760-3053 Caleb Cayago Water Quality Technician (415) 508-2138 (415) 218-3584 Matthew Lee Assistant Engineer - Utilities (415) 508-2128 (415) 530-8990 Alexander Joel Engineering Technician (415) 508-2130 (415) 713-9266 Keegan Black Maintenance Team Leader -
Buildings and Grounds (415) 508-2130 (628) 224-4998
Dolan Shoblo
Maintenance Program
Manager/Regulatory Compliance
Manager
(415) 508-2130 (415) 533-1681
Andrew Rehberg Harbor Master (650) 583-6975 (415) 510-6234 Dispatch Brisbane Police (415) 467-1212 911
Engine 81 Brisbane Fire (415) 657-4300 (415) 716-0414
Battalion Chief (650) 740-7386 911
Dispatch San Mateo County (650) 368-1421 911
Company Nurse (650) 742-7110
Last Updated: December 2025
City of Brisbane – Sewer System Management Plan 41
APPENDIX C
Relevant Municipal Code Sections
Overall Legal Authority
ARTICLE II. - USE OF PUBLIC SEWERS REQUIRED
13.04.270 - Discharge of sewage to sanitary sewers required.
All sewage shall be discharged to public sanitary sewers except as provided in this chapter. (Ord. No. 591, § 1, 3-19-15)
13.04.280 - Deposit of objectionable waste upon public or private property prohibited.
It is unlawful for any person to place, deposit, or permit to be deposited in any unsanitary manner upon public or private property within the city, or in any area under the jurisdiction of the city, any human or animal excrement, or other objectionable waste. (Ord. No. 591, § 1, 3-19-15)
13.04.290 - Discharge of polluted water into storm sewers restricted.
It is unlawful to discharge into any storm sewer or to any natural outlet or watercourse within the city, or within any area under the jurisdiction of the city, any sanitary sewage, industrial waste, or other polluted water. (Ord. No. 591, § 1, 3-19-15)
13.04.300 - Use of privies, septic tanks and cesspools restricted.
It is unlawful to construct, maintain, or use within the city, any privy, privy vault, septic tank, cesspool, or other facility designed, or intended to be utilized, for the disposal of sewage, except in those cases in which a special permit is granted therefor by the health officer, and then only for the duration of, in accordance with the terms of, and in strict conformity to the provisions of, such permit. (Ord. No. 591, § 1, 3-19-15)
13.04.310 - Installation of toilet facilities required.
The owner of every house, building, or property used for human occupancy, employment, recreation, or other purpose, situated within the city and abutting on any street, alley, or right-of-way in which there is now located or may in the future be located, a public sanitary sewer of the city, is required to install, at his own expense and as soon as practicable, suitable toilet facilities therein or thereon, and to connect, without any undue delay, and, in no event, at a date later than ninety (90) days following official notice from the health officer, such facilities directly with the proper public sewer in accordance with the provisions of this chapter; provided, that the public sewer is within a reasonable distance.(Ord. No. 591, § 1, 3-19-15)
City of Brisbane – Sewer System Management Plan 42
13.04.320 - Discharge of industrial waste into storm sewer prohibited.
Discharge of industrial waste into a storm sewer or to a natural outlet or watercourse shall be prohibited at all times. (Ord. No. 591, § 1, 3-19-15) ARTICLE III. - APPLICATION FOR SERVICE—INSTALLATION AND
CONNECTION REQUIREMENTS AND CHARGES
13.04.330 - Unauthorized connections or use prohibited.
No unauthorized person shall uncover, make any connections to, or make any opening into, any public sewer or appurtenance thereof, or in any manner or to any extent use, alter, or disturb the same. (Ord. No. 591, § 1, 3-19-15)
13.04.340 - Application requirements.
A. Applications for connection to a public sewer shall be made by the property owner or the owner's authorized agent on a form furnished by the city. Each application shall be supplemented by such plans, specifications, analyses, flow data, or other information as may be required by the director.
B. Where a private easement is required in order to connect the owner's property to the public sewer, a proper legal description and drawings, including a diagram plan and profile, shall be submitted with the application.
C. In the case of every connection, irrespective of whether a new physical connection is to be made, a new or amended application shall be submitted upon any change in the occupancy or activity conducted upon the premises that results in a new or increased discharge into the public sewer. (Ord. No. 591, § 1, 3-19-15)
13.04.350 - Sewer connection fee.
If any construction or installation work will be performed by the city for the purpose of connecting a structure or project to the public sewer, the city shall be entitled to charge the owner of such structure or project a sewer connection fee in an amount equal to all costs that will be incurred by the city for the performance of such work, as determined by the director. An estimated payment of the sewer connection fee shall be deposited with the city prior to the commencement of work. Upon completion of the connection, the actual costs shall be determined by the director. If such costs are greater than the deposit, the owner shall pay the deficit to the city within fifteen (15) days after a billing for the amount due is mailed to the owner. Until such deficit is paid in full, the city may withhold issuance of a certificate of occupancy or any other permit or approval relating to the property. If the deposit is greater than the actual cost, the city shall refund the excess to the owner within thirty (30) days after such costs have been finally determined. (Ord. No. 591, § 1, 3-19-15)
City of Brisbane – Sewer System Management Plan 43
13.04.360 - Sewer capacity charges.
A. Sewer capacity charges for single family dwellings, duplex dwellings, multiple family dwellings, and non-residential uses shall be paid to the city by the owner, or by any other person obligated to pay such charges, who desires the connection of any such property to the sewage works, based upon the following schedule:
B. The sewer capacity charge shall be paid to the city prior to the issuance of any building permit.
C. For the purpose of calculating the capacity charge for multi-family dwellings, separate common facilities requiring a sewer connection, such as laundry rooms, community buildings and recreational facilities, shall be considered to be separate units.
D. If, at any time, the existing use of a property changes, either through the establishment of a different use or a change in the size or nature of the existing use, and such change results in an increase in the number of dwelling units or an increase in the number of ERUs being connected to the sewer works, a sewer capacity charge shall be paid for such additional units or additional ERUs, as determined by the director. (Ord. No. 591, § 1, 3-19-15)
13.04.400 - Control manholes required.
When required by the director, the owner of any property served by a building sewer or sewers carrying industrial wastes shall, at his expense, install and maintain suitable control manholes in each such building sewer to facilitate observation, sampling, and measurement of the wastes. Each manhole, when required, shall be accessibly and safely located, shall be constructed in accordance with plans approved by the director, and shall be maintained by the owner so as to be safe and accessible at all times. (Ord. No. 591, § 1, 3-19-15)
13.04.410 - Connections to public sewers.
The connection to the public sewer, including the sewer lateral components within any public street or right-of-way, shall be installed at the sole expense of the owner of the Type of Property: Capacity Charge:
Single family dwelling $2,523.00
Duplex dwellings $5,046.00
Multifamily dwellings $1,802.00 per unit
Non-residential uses $.002,523.00 per ERU
City of Brisbane – Sewer System Management Plan 44
property served, by a contractor with an appropriate license issued by the state for this work. The contractor shall be prequalified before issuance of any permit. Such connection shall not be made without an approved permit issued by the director. (Ord. No. 591, § 1, 3- 19-15)
13.04.412 - Maintenance of sewer laterals.
A property owner shall maintain in good repair all portions of the sewer lateral servicing his or her property. If the director determines that any portion of a property owner's sewer lateral is damaged, not in good repair, or otherwise in a condition which may result in stoppage, leakage, infiltration or backflow, the director may issue a notice to inspect and/or repair to the property owner. The notice will specify the nature of the suspected defect, whether inspection, or inspection and repair, is required, and specify a date by when the property owner must inspect, repair or replace the sewer lateral. The property owner shall perform all necessary inspections, repair or replacement by the date as specified by the director. (Ord. No. 591, § 1, 3-19-15)
13.04.414 - Emergency maintenance of sewer laterals.
The director may at his or her discretion provide emergency maintenance assistance to a property owner to determine if a sewer stoppage is within the public sewer or within the property owner's sewer lateral, provided that a sewer cleanout has been provided as required in Section 13.04.420(G). The city shall not be liable for the repair or replacement of any portion of the sewer lateral as a result of emergency maintenance. (Ord. No. 591, § 1, 3-19-15)
13.04.420 - Sewer installation specifications and requirements.
Sewers to be installed in the city shall satisfy the following requirements:
A. All sewers constructed in the public right-of-way shall be constructed in accordance with plans and specifications approved by the city council upon recommendation of the director. Sewer laterals shall be constructed in accordance with standard plans prepared by the director and approved by the city council.
B. Minimum size of all sewer laterals shall be four (4) inches and shall require a cleanout at the property line.
C. The minimum size of public sewers shall be eight (8) inches and standard manholes shall be placed at frequencies no greater than three hundred (300) feet or in places of change of direction or grade, except sewers twelve (12) inches in diameter or greater, under which circumstances the specific design shall be approved by the director.
D. When sewers cannot be placed in the public right-of-way or in existing rights-ofway of ten (10) feet in width or greater, special easements shall be acquired a
City of Brisbane – Sewer System Management Plan 45
minimum of ten (10) feet in width and wherever possible shall straddle existing property lines.
E. Wherever easements ten (10) feet in width or greater can be acquired, public sewers shall be extended in accordance with approved plans and specifications and in accordance with proper master planning for the area being served.
F. Wherever a public sewer can be extended along public rights-of-way or standard easements, each service shall be extended to the public sewer by a sewer lateral serving only one unit of ownership unless the city council, by resolution, approves the service of more than one unit of ownership by a lateral.
G. A cleanout shall be placed on each sewer lateral at the transition between the upper and lower portions of the lateral. The director may additionally require the installation of a backflow prevention device on the sewer lateral when he or she reasonably believes backflow has or may occur.
H. Wherever a substandard extension of the public sewer exists, i.e., a line smaller than eight (8) inch or across private easements, no further extension of the sewer line can be made until such a time as an agreement for maintenance and rights of easement for all individuals using the line is recorded with the office of the county recorder. (Ord. No. 591, § 1, 3-19-15; Ord. No. 678, § 1, 3-2-23)
13.04.430 - Joint sewer lateral installation and maintenance.
The director may upon finding good cause therefor, grant approval for a joint sewer lateral (one that services two (2) or more properties); provided, that each property owner shall submit plans to the director for prior approval. Any approval granted by the director for a joint sewer lateral shall be in a form as approved by the city attorney and shall be generally subject to the following terms and conditions:
A. Installation and maintenance costs of the joint sewer lateral shall be shared equally by the parties thereto. Any person who subsequently connects to the joint sewer lateral shall share in the cost thereof on a pro rata basis.
B. Original installation and repairs must be pursuant to code, and approval of the plumbing or building inspector is required.
C. One owner may hire a licensed plumber to make emergency repairs without the consent of the other owners, in the event they are not available, and the cost of the emergency repairs shall be shared on a pro rata basis.
D. No user shall interrupt the continuity of the service or cause to have interrupted the continuity of the service of the joint sewer lateral, in such a manner as to cause damage or inconvenience to the other users, other than for a reasonable time required for repair.
City of Brisbane – Sewer System Management Plan 46
E. In the event that the owner or users fail to act and the director and/or health officer determines that conditions in the joint sewer lateral are such as to be a hazard to health or safety, then the city may, pursuant to written notice, order the work done and divide the cost, as specified in subsection A of this section, on the tax bill if it is not compensated within fifteen (15) days from the time of billing by registered mail to each of the users last known address or that shown on the last equalized assessment roll.
F. The owners and users of the joint sewer lateral shall assume all responsibility and liability in connection therewith and they shall hold the city harmless.
G. The owners of the property on which the joint sewer lateral is located shall grant and have recorded an easement of not less than ten (10) feet in width for the maintenance and repair of the joint sewer lateral. (Ord. No. 591, § 1, 3-19-15; Ord.
No. 667, § 1, 10-21-21)
13.04.431 - Disclosure and joint sewer lateral agreement; when required.
A. All property owners whose property or properties are served by a joint sewer lateral and who have received approval for a joint sewer lateral under Section 13.04.430 shall enter into and record a joint sewer lateral agreement before the city will issue a final building permit when the property owner has undertaken work that:
1. Triggers the requirements of Chapter 15.10 of this code;
2. Is associated with a change in water service (e.g., change in meter size or the addition of a meter; or
3. Results in maintenance on the existing joint sewer lateral, whether routine or emergency.
B. Beginning January 1, 2022, except as provided in subsection C, any property owner intending to sell or transfer a fee interest in real property must disclose the requirements of this Section 13.04.431 to each of the following:
1. The property owner's real estate broker or agent, if any;
2. The person to whom the real property is intended to be sold or transferred;
3. The real estate broker or agent, if any, of the person to whom the real property is intended to be sold or transferred;
4. The escrow company or holder involved in the real property sale or transfer, if any.
C. Subsection B of this Section 13.04.431 shall not apply to:
City of Brisbane – Sewer System Management Plan 47
1. Sales or transfers of individual units within a condominium as defined in Section 17.02.150 of this code;
2. Sales or transfers of less than a fee interest, e.g., a leasehold;
3. Sales or transfers to a fiduciary in the course of the administration of a decedent's estate, a guardianship or a conservatorship;
4. Transfers from one co-owner to one or more other co-owners;
5. Transfers to a revocable trust if the trust is for the benefit of the grantor(s);
6. Transfers made by a trustor to an intervivos trust;
7. Transfers between spouses or between registered domestic partners;
8. Transfers to a financial institution, trust deed holder, or trustee of a deed of trust, as part of foreclosure or similar process.
D. The director shall prepare a handout or other written material, to be made available to the public, describing the requirements of this section. A person may satisfy the disclosure requirements of subsection B by providing a then current copy of the handout or other written material to those parties identified in subsection B. (Ord.
No. 667, § 2, 10-21-21)
13.04.440 - Costs of construction of public sewer lines by private parties.
Whenever the city accepts the dedication of a public sewer line, constructed by a private party, which is capable of being connected to and serving other private parties, the city council may enter into agreements and adopt a resolution permitting the city to collect the pro rata share of the reasonable cost of the public sewer, plus administrative costs, from other parties connecting to the public sewer line, and reimbursing the sums collected to the party dedicating the public sewer line to the city. (Ord. No. 591, § 1, 3-19-15)
13.04.450- Costs of extension of public sewer main by city.
In the event the Brisbane public sewer main is extended by the city, and the cost thereof is determined by the director, the city council may adopt a resolution charging a public sewer main extension fee so that each person connecting thereto shall pay their pro rata share for the cost of the public sewer main extension. (Ord. No. 591, § 1, 3-19-15)
13.04.452 - Sewer lateral certificate issuance.
A. Issuance Criteria. The director may issue a sewer lateral certificate for a property when:
City of Brisbane – Sewer System Management Plan 48
1. The entire sewer lateral was lawfully constructed and the director determines that the lateral is not in need of repair or replacement based on either city records and files that indicate the lateral has been installed, repaired or replaced within the last fifteen (15) years or the property owner has provided sufficient evidence to the director, by testing and inspection (solely at the property owner's expense) that the lateral is not in need of repair or replacement; and
2. The entire sewer lateral is entirely within the property served by the lateral, or if across the property of others there is a recorded access easement and maintenance agreement, in a form approved by the director; and
3. If the sewer lateral serves more than two (2) properties, the requirements of Section 13.04.430 have been satisfied.
B. Effective Period and Fee.
1. A sewer lateral certificate issued under subsection (A)(1) may be issued at no cost and shall be valid for a period equal to the difference of fifteen (15) years minus the number of years since construction of the lateral unless the director establishes a shorter period based on circumstances including but not limited to the age of the lateral and other factors affecting its integrity and reliability. (Ord. No. 591, § 1, 3-19-15)
13.04.453 - Disclosure and sewer lateral certificate; when required.
A. A person must possess or obtain a sewer lateral certificate issued under Section 13.04.452 before the city will issue a final building permit when the person has undertaken work that:
1. Triggers the requirements of Chapter 15.10 of this code; or
2. Is associated with a change in water service (e.g., change in meter size or the addition of a meter).
B. Beginning April 20, 2015, any person intending to sell or transfer a fee interest in real property must disclose the requirements of this section to each of the following, except as provided in subsection C.:
1. The person's real estate broker or agent, if any;
2. The person to whom the real property is intended to be sold or transferred;
3. The real estate broker or agent, if any, of the person to whom the real property is intended to be sold or transferred;
City of Brisbane – Sewer System Management Plan 49
4. The escrow company or holder involved in the real property sale or transfer, if any.
C. Subsection B. does not apply to:
1. Sales or transfers of individual units within a condominium as defined in Section 17.02.150 of this code;
2. Sales or transfers of less than a fee interest, e.g., a leasehold;
3. Sales or transfers to a fiduciary in the course of the administration of a decedent's estate, a guardianship or a conservatorship;
4. Transfers from one co-owner to one or more other co-owners;
5. Transfers to a revocable trust if the trust is for the benefit of the grantor(s);
6. Transfers made by a trustor to an intervivos trust;
7. Transfers between spouses or between registered domestic partners;
8. Transfers to a financial institution, trust deed holder, or trustee of a deed of trust, as part of foreclosure or similar process.
D. The director shall prepare a handout or other written material, to be made available to the public, describing the requirements of this section. A person may satisfy the disclosure requirements of subsection B. by providing a then current copy of the handout or other written material to those parties identified in subsection B. (Ord. No. 591, § 1, 3-19-15; Ord. No. 653, §1, 10-15-20)
ARTICLE IV. - REGULATION OF DISCHARGES
13.04.460 - Discharge of stormwater, surface water and groundwater into sanitary sewer prohibited.
No person shall discharge, or cause to be discharged, any stormwater, surface water, groundwater, roof runoff, or subsurface drainage into any sanitary sewer. (Ord. No. 591, § 1, 3-19-15)
13.04.480 - Discharge of substances causing obstructions to public sewers prohibited.
No person shall discharge, deposit, throw, or cause, allow, or permit to be discharged, deposited, or thrown, into any public sewer or into any plumbing fixture, manhole, or private sewer or drain connected to a public sewer, any substance of any kind whatever tending to obstruct or injure the sewage works, or to cause a nuisance or hazard, or which
City of Brisbane – Sewer System Management Plan 50
will in any manner interfere with the proper operation or maintenance of the sewage works in the opinion of the director. (Ord. No. 591, § 1, 3-19-15)
13.04.490 - Prohibited discharges to public sewers.
A. Except as hereinafter provided, no person shall discharge or cause to be discharged any of the following waters or wastes into any public sewer:
1. Any liquid or vapor having a temperature detrimental to the sewer system;
2. Any gasoline, benzene, naphtha, fuel oil, or other flammable or explosive liquid, solid, or gas;
3. Any water or waste which contains excessive amounts of grease, oil, or fats;
4. Any garbage, except properly ground garbage from individual dwelling units, as specified in Section 13.04.530
5. Any sand, cement, cinders, ashes, metal, glass or other heavy solids; any straw, shavings, animal hair, feathers, paunch manure, or other fibrous matter; and tar, asphalt, resins, plastics, or other viscous substance; or any other matter of such a nature as to obstruct the flow in sewers or as to cause other interference with the proper operation of the sewage works;
6. Any water or waste containing excessive amounts of acid, alkali, or dissolved sulfide, or having any other corrosive property capable of causing damage or hazard to structures, equipment, or personnel of sewage works;
7. Any waters or wastes containing a toxic or poisonous substance in sufficient quantity to injure or interfere with any sewage treatment process, to constitute a hazard to humans or animals, or to create a hazard in the waters receiving effluent from the sewage treatment plant;
8. Any waters or wastes containing suspended solids or dissolved matter of such character and quantity that unusual attention or expense is required to handle such materials at the sewage treatment plant;
9. Any noxious or malodorous gas or substance capable of creating a public nuisance;
10. Any radioactive wastes, as provided in Sections 13.04.540 and 13.04.550 B. Whenever deemed necessary by the director, the owner shall, at his own expense, provide such treatment or take such other measures as shall be required in order to reduce the objectionable characteristics, contents, or rate of discharge of waters or wastes being deposited in the sewer, so that the same may be received therein without
City of Brisbane – Sewer System Management Plan 51
any damage to the sewage works or any undue interference with its operation and without any hazard of any kind to humans or animals. (Ord. No. 591, § 1, 3-19-15)
13.04.500 - Restrictions on quantity and character of wastes.
A. The admission into the public sewers of any wastes or waters having an average daily flow greater than two percent (2%) of the average daily flow at the sewage treatment plant, or having any of the following characteristics, shall be subject to the review of the director:
1. Temperature in excess of one hundred fifty degrees (150°) Fahrenheit, approximately sixty-five and six-tenths degrees (65.6°) Centigrade;
2. Suspended solids, or matter which upon dilution with water or sewage results in the formation of suspended solids, in excess of five hundred (500) parts per million;
3. Biochemical oxygen demand in excess of four hundred (400) parts per million;
4. Floatable grease of animal or vegetable origin in excess of fifty (50) parts per million, and of mineral origin in excess of fifteen (15) parts per million, or dispersed grease in excess of six hundred (600) parts per million;
5. A pH of less than five and five-tenths (5.5) or more than ten and five-tenths (10.5);
6. Dissolved sulfides in excess of one part per million.
7. Discharge characteristics that in the opinion of the director may adversely affect the public sewers or sewage works.
B. The provisions of subsection A and the values therein set forth shall not be regarded or construed as regulating or limiting the quantity or character of any specific industrial waste which may be received into the sewer system, but shall serve as a guide in the administration of this chapter for the purpose of determining, in general, the acceptability of waste for admission into the sewer system.
C. In addition to the provisions of subsections A and B, whenever the city is provided wastewater treatment by the city and county of San Francisco, wastewater dischargers shall also comply with the "Permit Provisions" of the Industrial Waste Article of the San Francisco Public Works Code.
1. The general manager of the public utilities commission of San Francisco will require dischargers to obtain a class I permit authorizing wastewater discharge if they meet the definition of a significant industrial user; (1) a person subject to categorical pretreatment standards; (2) a person discharging twenty-five thousand
City of Brisbane – Sewer System Management Plan 52
(25,000) gallons per day or more of wastewater, excluding sanitary, noncontact cooling and boiler blowdown wastewater; (3) a person discharging wastewater that constitutes five percent (5%) or more of the average dry weather hydraulic or organic (BOD, TSS) capacity of the tributary water pollution control plant; or (4) a person discharging a wastestream that, in the opinion of the general manager, will or may adversely affect the sewerage system by causing interference, pass-through of pollutants, sludge contamination, or endangerment of city workers.
2. The general manager may require minor dischargers (i.e., a person other than a significant industrial user) to obtain a class II permit if necessary to further the objectives of the industrial waste article. (Ord. No. 591, § 1, 3-19-15)
13.04.510 - Private treatment facilities.
When private treatment facilities are provided for any waters or wastes to meet the requirements of this chapter, they shall be maintained in a satisfactory and effective manner of operation by the person discharging such waters or wastes, all at his own expense. (Ord. No. 591, § 1, 3-19-15)
13.04.520 - Grease, oil and sand interceptors.
Grease, oil and sand interceptors shall, at the expense of the owner or tenant, be provided in all commercial plumbing systems, new or existing, for those establishments producing liquid waste containing, or likely to contain, any flammable substance or sand or quantities of grease in excess of the amounts set forth in Section 13.04.500. Interceptors shall conform with all requirements of the plumbing code of the city insofar as the same are applicable, shall be of a type and capacity approved by the director, and shall be so located as to be readily and easily accessible for cleaning and inspection. Where installed, all grease, oil and sand interceptors shall be maintained by the owner, at his expense, in a continuously efficient operation. (Ord. No. 591, § 1, 3-19-15)
13.04.530 - Admittance of properly ground garbage into sanitary sewer.
Garbage, fruit, vegetable, animal or other solid kitchen waste materials from individual dwelling units, resulting from the preparation of any food or drink, may be admitted into the sanitary sewer if first passed through a mechanically operated grinder so designed that:
A. It shall operate with cold water flowing into the grinder and through the sink drain line in such manner as to congeal and aerate the solid and liquid greases within the grinding unit;
B. It shall discharge wastes at a reasonably uniform rate in fluid form, which shall flow readily through an approved trap, drain line, or soil line in a manner which prevents clogging or stoppage of the drain line;
City of Brisbane – Sewer System Management Plan 53
C. It shall be of such construction and have such operating characteristics that not more than five percent (5%) by weight of all material discharged from it shall have any dimension larger than one-fourth (¼) inch, and no particle shall have any dimension greater than one-half (½) inch. Weights shall be determined on a dry basis; D. It shall be self-scouring, with no fouling surfaces to cause objectionable odors; E. It shall be free from electrical or mechanical hazards and shall adequately protect the user against injury during operation;
F. It shall be permanently connected to the drain in compliance with the plumbing code of the city and shall be free from cross-connection to any water pipe; and G. The entire installation shall comply in all particulars with the provisions of the plumbing and electrical codes of the city.
The decision as to the sufficiency of the design to meet these requirements shall rest with the director. (Ord. No. 591, § 1, 3-19-15)
13.04.540 - Radioactive wastes—Discharge into public sewers.
No person shall discharge, or cause to be discharged, any radioactive wastes into any public sewer or appurtenances thereof, except where:
A. The waste is discharged in strict conformity with current Atomic Energy Commission recommendations for safe disposal of radioactive wastes; and B. The person discharging the radioactive wastes assumes full responsibility for any injury to personnel or damage to the sewage works that may result from such discharge. (Ord. No. 591, § 1, 3-19-15)
13.04.550 - Radioactive wastes—Reports required—Responsibility for spillage into sanitary or storm sewer.
Any person discharging a radioactive waste to a public sewer, in accordance with the provisions of Section 13.04.540, shall submit to the director such reports as the director may deem necessary. In the event of an accidental spilling or depositing of any radioactive material into a sanitary or storm sewer, the person who causes such occurrence, or who is responsible therefor, shall:
A. Immediately notify the director; and
B. Render such technical or other assistance to the department of public works as may be required to avoid any hazard from the radioactivity. (Ord. No. 591, § 1, 3-19-15)
13.04.560 - Suspension of service for unlawful use of sewers.
City of Brisbane – Sewer System Management Plan 54
When deemed necessary by the director for the preservation of public health or safety, or for protection of public or private property, he may suspend sewer service to any person or persons using the sewage works in a manner or way as to endanger the public health or safety on public or private property, and in this regard may sever from the public sewer all pertinent connections thereto. If such endangerment shall be imminent, then the director may act immediately to suspend sewer service without giving any advance notice or warning whatsoever to the person or persons. (Ord. No. 591, § 1, 3-19-15)
13.04.570 - Treatment of water or waste of unusual strength or character.
No statement contained in Sections 13.04.460 through 13.04.560 shall be construed as preventing any special agreement or arrangement between the city and any individual or industrial concern, whereby any water or waste of unusual strength or character or composition may be accepted by the city for treatment. In the event that any such special agreement or arrangement shall involve additional or extraordinary expense to the city, such individual or industrial concern may, at the option of the city, be required to reimburse the city therefor and, in that connection, to post with the city such bond or other guarantee as shall be acceptable to the city. (Ord. No. 591, § 1, 3-19-15) ARTICLE V. - ADMINISTRATION AND ENFORCEMENT
13.04.580 - Unauthorized damage or destruction of sewage works prohibited.
No unauthorized person shall maliciously, willfully, or negligently break, damage, destroy, uncover, deface, or tamper with any structure, appurtenance, or equipment which is a part of the sewage works. (Ord. No. 591, § 1, 3-19-15)
13.04.590 - Appeal procedure.
A. In the event that any interested or affected person feels aggrieved because of, or is dissatisfied with, any action or determination of the director, such person shall be entitled to take an appeal in writing, with the order of chain of appeal being as follows:
1. To the city manager if dissatisfied with any action or determination of the director; and
2. To the city council if dissatisfied with any action or determination of the city manager.
B. If thirty (30) days or more elapses following the action or determination of any one of the officials in the chain of appeal designated in subsection A of this section without an appeal being taken therefrom, then the action or determination of such official or officials shall become final. (Ord. No. 591, § 1, 3-19-15)
13.04.600 - Power and authority of inspectors.
City of Brisbane – Sewer System Management Plan 55
The director, and other duly authorized employees and agents of the city bearing credentials and identification shall, in all cases affected by this chapter, be permitted to enter upon all properties for the purpose of:
A. Determining the size, depth, location, and condition of any sewer or storm drain connection;
B. Determining the location of discharge connections of roof and surface drains and plumbing fixtures; and
C. Inspecting, observing, measuring, sampling, and testing the quantity, consistency, and characteristics of sewage being discharged into any public sewer or natural outlet. (Ord. No. 591, § 1, 3-19-15)
13.04.610 - Violation—Notice.
Any person found to be violating any provision of this chapter, except Section 13.04.580, shall be served by the city with written notice which shall state the nature of the violation and shall provide a reasonable time limit for the satisfactory correction thereof, the actual duration of the time limit to depend, in any particular case, upon all the facts and surrounding circumstances. The offender shall, within the period of time specified in such notice, permanently cease the continuance of the violation. (Ord.
No. 591, § 1, 3-19-15)
13.04.620 - Violation—Penalties.
The violation of any of the provisions of this chapter shall constitute a misdemeanor, punishable by the fines, penalties and enforcement provisions set forth in Chapters
1.14, 1.16 and 1.18 of this code. (Ord. No. 591, § 1, 3-19-15)
13.04.630 - Violation—Liability for expense, loss or damage.
Any person violating any of the provisions of this chapter shall become liable to the city for any and all expense, loss, or damage occasioned the city by reason of such violation. (Ord. No. 591, § 1, 3-19-15)
City of Brisbane – Sewer System Management Plan 56
APPENDIX D
City Standards for
Sewer Installation, Rehabilitation, and Repair
and
Inspection and Testing of New and
Rehabilitated Sewer Facilities
DEFINITIONS
Sewage or Wastewater: This is the “used” water that contains human wastes from toilets and water from other sources such as sinks, showers, washing machines, dishwashers, etc. Industrial and commercial wastes are also considered sewage or wastewater.
Sanitary Sewer System, or Wastewater Collection System, or Sewers: These are pipes through which sewage is carried from homes and businesses to a treatment plant. The sanitary sewer system includes the main sewer lines in the streets and the branch lines to individual sewer customers called “sewer laterals.”
Sewer systems are generally designed to flow by gravity through sloped pipes until it reaches either the treatment plant or a sewage pumping station (which pumps the sewage up to another higher sewer or a treatment plant).
The term “sanitary sewer” is used because sewer pipes are separate from the pipes used for storm water drainage. This helps protect public health and the environment. In some older cities, such as San Francisco, sewage and rainwater flow through the same pipes. This can cause major environmental and public health problems because untreated or partially treated-sewage may be discharged into streams, rivers, and other water bodies during heavy rain.
Sewer Lateral: This is the sewer pipe that connects a building's plumbing system to the main sewer line in the street. Maintenance and ownership of sewer lateral pipes is the responsibility of the property owner.
Sewer Main: This is the sewer pipe that collects flow from laterals. Mains are typically larger pipes than laterals, and get larger and larger further downstream as more and more flow enters the main. Sewer mains are typically located under public streets and maintained by the City.
Sewer Cleanout: This is a pipe rising from the sewer lateral to the ground surface with a removable cap or plug. It is used to access the sewer lateral to free blockages. A sewer cleanout is usually located just inside the property line. There may be additional sewer cleanouts at various other locations on a property.
Backflow Prevention Device: This is a device that prevents sewage from backing up from a main line into a lateral beyond where it is installed. This forces an overflow outside of a home, through a manhole or cleanout, rather than inside where significant property damage may occur.
City of Brisbane – Sewer System Management Plan 57
Infiltration: This refers to groundwater (water found below the ground surface) that enters sewer pipes through cracks, pipe joints, and other system leaks. Because sewers in coastal areas are typically buried deep, they are often located below the water table. Since most sewer lines do not flow full (under pressure), groundwater “infiltrating” into the sewer line is actually more of a problem than sewage leaking out of the line. Storm events can raise groundwater levels and increase infiltration of groundwater into sewer pipes. The highest infiltration flows are observed during or right after heavy rain. Too much infiltration may overload the sewers and cause spills.
Inflow: This is rainwater that enters the sewer system from sources such as yard and patio drains, roof gutter downspouts, uncapped cleanouts, pond or pool overflow drains, footing drains, crossconnections with storm drains, and even holes in manhole covers. Inflow is greatest during heavy rainfall and like infiltration, can cause excessive flows and sewage spills.
Manholes: Sewer manholes are underground structures used to provide access to underground sewer lines and are usually found in a street, parking area or sidewalk. Access is required to periodically inspect and clean the lines. Sewer manholes typically have heavy round covers with the words “Sanitary Sewer” on the cover.
Sanitary Sewer Overflow: Sewage spills are technically called “sanitary sewer overflows” since it involves the overflow of sewage from the sanitary sewer system. Sewage overflows often occur from sewer manholes in the streets. Sewage can also backup into homes through toilets, showers, and floor drains. Sewage spills are caused by sewage filling the sewer pipes behind the clog to the point where it spills out of an opening in the system (generally the lowest manhole, shower drain or other plumbing fixture).
Average Flows: Average flows are typically dry weather sewer flows over a specific time period and often expressed in gallons per day. Average flows do not account for inflow and infiltration and are therefore not usually the basis for designing a sewer piping system.
Peak Flows: Peak flows are typically average flows multiplied by a peaking factor to account for inflow and infiltration and diurnal fluctuations. Sewer designs are usually based on peak flows, and a typical peaking factor is between three and five.
Design Flows: Design flows are the flows used to design a sewer system. Typically, they are peak flows. For the City of Brisbane’s sewer design criteria, design flows are peak flows at build-out conditions, which are average flows multiplied by a peaking factor of three.
SEWER MAINS
Materials
1. New gravity mains shall be polyvinyl chloride (PVC) or high density polyethylene (HDPE) with a maximum standard dimensional ratio (SDR) of 35 for conditions with at least three feet of cover. In cases where the City authorizes less than three feet of cover, alternate SDRs may be required. The City may require alternate pipe materials in cases with less than minimum cover or when other utilities are in close proximity to the sewer main.
City of Brisbane – Sewer System Management Plan 58
2. For sewer main replacements that are five feet or less in length, pipe materials may match existing materials (e.g., when replacing a five-foot section of vitrified clay pipe (VCP), the replacement section can also be VCP). All sewer main replacements of more than five feet shall be PVC pipe.
Sizing
1. Flow Sizing
A. Gravity mains shall be a minimum of eight inches (8”) in diameter.
B. Mains shall be designed to carry peak flows at build-out conditions (“design flows”).
Average daily flow values shall be computed based on the following table, and multiplied by a peaking factor of five (5) to determine design flows. Calculations for design flow rates shall be submitted to the City Engineer for review.
Land Use
Unit Flow
Rate
(gallons/day/
acre)
Unit Flow Rate
(gallons/day/
dwelling unit)
Brisbane Village Neighborhood Commercial District 500 - Downtown Brisbane Neighborhood Commercial District 500 - Manufacturing District 500 -
Medium Density Apartment District - 90
Multiple Use Residential District - 90
Office District 1500 -
Open Space District 0 -
Planned Development District - 90
Single Family (20,000 sq. ft. building site) - 105
Single Family (5,000 sq. ft. building site) - 105
Southwest Bayshore Commercial District 500 -
Trade Commercial – Crocker Park District 250 -
C. Maximum depth of flow for pipes between eight and ten inches in diameter shall be onehalf (1/2) the pipe diameter at design flows. For pipes twelve inches and larger in diameter, the maximum flow depth shall be two-thirds (2/3) the pipe diameter at design flows.
D. Mains shall be sized using Manning’s equation based on design flows, a roughness coefficient (“n”) of 0.0135 or the pipe manufacturer’s recommendation, whichever is greater, maximum flow depths, and maintaining minimum design slopes.
E. Miscellaneous head losses at manholes, curves, and junctions shall be estimated and allowed for as follows:
i) At manholes on straight runs allow head loss = 0.05 feet. ii) 90° turns made inside of manholes, where the radius of turn is less than two pipe diameters, allow 0.50 V²/2g. If the radius of turn is greater than two pipe diameters,
City of Brisbane – Sewer System Management Plan 59
allow 0.25 V²/2g. In no case shall the total allowance be less than 0.05 feet. iii) At transitions and intersections of sewers larger than 24 inches in diameter, allow
0.50 V²/2g.
2. Velocity Sizing
A. Mains shall be designed to transport suspended solids without deposition in the pipe.
B. Mains shall be designed to maintain minimum cleansing velocities of three (3) feet per second for ten inch and smaller diameter pipes and two (2) feet per second for twelve inch and larger diameter pipes at design flow conditions.
C. The maximum velocity for all pipe diameters is 10 feet per second.
Alignment
1. Depth
A. Gravity mains shall be installed at a depth sufficient to provide a minimum of three feet of cover above the crown of the pipe. Installations with lesser amounts of cover are at the City’s discretion, and may require alternative pipe material.
B. Sewers shall be installed at sufficient depth to provide gravity service to properties contiguous to the sewer line. Additional depth may be required to provide service.
Generally, house services shall be a minimum of four feet below the top of curb at the property line as measured from the top of curb to the invert of the services.
2. Slope
A. Ten-inch and smaller diameter mains shall have a minimum slope of 0.0036. Twelveinch and larger diameter mains shall have a minimum slope of 0.0024.
B. Slopes shall be adjusted based on ground level gradient and maintaining minimum cleansing velocities. Minimum slopes shall only be used when topography and existing sewer depth make greater slopes impossible or when anticipated flows are such that scouring velocity is achieved on a regular basis. Increasing pipe size to allow lesser slopes will be at the City’s discretion.
3. Curvature
A. Horizontal and vertical curves are not recommended, but in cases where justification can be shown, limited use of such designs will be considered. A design report shall be submitted from the design engineer justifying a curved alignment. In no case shall horizontal or vertical curves exceed 1/32 bend (11.25 degrees). Complete and accurate details shall be furnished, including: exact location of such curved sewers, length of
City of Brisbane – Sewer System Management Plan 60
curve, degree of curve (or radius), and stationing of curve points.
B. Where curved alignments are utilized, the City may require the following:
i) Slope greater than minimum slope for the size of pipe. ii) Manhole spacing of less than 300 feet.
iii) Provide a licensed professional land surveyor or engineer to continuously monitor installation of the curved pipe during construction.
iv) Video inspection prior to final acceptance.
4. Placement in street/easement
A. Under normal conditions, sewers shall be constructed in straight lines from manhole to manhole in public rights-of-way or private roads. When practical, sewers shall be installed on the opposite side of the right-of-way from water and storm drain lines.
B. Sewer trenches shall not extend under the edge of gutters.
C. When necessary to locate sewers in public easements, such easement shall have a width equal to twice the depth of the sewer main, or 15 feet, whichever is greater. Sewers 24 inches in diameter or larger, or over 12 feet in depth, may require wider easements. All easements shall allow for year-round vehicular access to all manholes and cleanouts.
Clearances to other utilities/structures
1. Sewer mains shall be installed a minimum of 10 feet horizontally from all structures and existing or proposed water mains. In situations where it is not feasible to maintain a 10-foot separation, the distance may be reduced at the City’s discretion.
2. Sewer mains shall have a minimum one foot clearance to all other utilities. Installations with lesser clearances are at the City’s discretion and may require alternate pipe materials.
3. Sewer mains shall be installed beneath water lines and storm drain lines by at least 18 inches (crown of sewer line to invert of water or storm drain line). Crossings shall be arranged so sewer line joints will be equidistant and as far as possible from the water main (~10 feet).
4. Sewer mains shall be installed at least five feet horizontally from all trees, where practical.
Cover/trench requirements
1. Minimum cover over gravity sewer mains shall be three feet.
City of Brisbane – Sewer System Management Plan 61
2. Plastic detection tape shall be installed one foot above the crown of all gravity sewer mains.
3. Sewer main trenches shall be backfilled with four inches of compacted fill sand prior to laying pipe. Once pipe is installed, it shall be backfilled to twelve inches above the crown with compacted fill sand, followed by native material (with rocks over two inches removed) compacted to 90% relative compaction. Native material shall extend to finished grade in unimproved areas. In existing or new streets, backfill and street section above the pipe shall be in accordance with the City’s Street Standards.
Maximum run between and connections to manholes
1. The maximum run between manholes shall be no more than 300 feet.
2. Connection to existing manholes shall be made with a concrete core saw and neoprene adapter boot. Exceptions to this requirement are at the City’s discretion. New connections to existing manholes shall be fitted with a temporary plug until the entire project has been accepted. Connections to structures other than manholes shall be specifically detailed on the plans for approval by the City.
Cleanouts
Terminal cleanout structures are acceptable at the end of sewer lines if located no more than 100 feet to the downstream manhole.
LATERALS
Materials
Sewer laterals shall be SDR 35 PVC or HDPE pipe with a minimum of three feet of cover. In situations where cover is between 18 inches and three feet, SDR 26 is required. The City may require alternative pipe materials if minimum cover cannot be achieved.
Sizing
Laterals shall be a minimum of four inches (4”) in diameter for single family residences and six inches (6”) for multiple units, apartments, local retail, and commercial, and eight inches (8”) or larger as required for manufacturing and industrial, and should be sized to accommodate anticipated flow.
Connections per building/unit
For new construction, service laterals shall be provided to every parcel being served as part of the project. Each individual building or dwelling unit requires a separate service lateral, with separate connection to the sewer main. Connections for multi-unit buildings will be at the City’s direction. For existing construction, if the City determines individual buildings or dwelling units are served by a joint lateral, the City may require property owners to install separate laterals for
City of Brisbane – Sewer System Management Plan 62
each building or dwelling unit and establish appropriate private easement agreements as necessary, or may require upgrades to existing joint laterals if installation of separate laterals is infeasible.
Alignment
1. Depth
Laterals shall be placed a minimum of three feet (3’) below finished grade. This shall extend all the way to the building connection. Therefore, in general, the minimum depth for sewer to serve a given residential property shall be three feet plus 2% times the length of the house lateral (the distance from the sewer to the center of the house). Less than minimum cover is at the City’s discretion and may require alternative pipe material.
2. Slope
Laterals shall have a minimum two percent (2%) slope. Lesser slopes are at the City’s discretion.
3. Cover/trench requirements
Sewer lateral trenches shall be backfilled with four inches of compacted fill sand prior to laying pipe. Once pipe is installed, it shall be backfilled to twelve inches above the crown with compacted fill sand, followed by native material (with rocks over two inches removed) compacted to 90% relative compaction. Native material shall extend to finished grade in unimproved areas. In existing or new streets, native material shall be followed by asphalt concrete/aggregate base lifts in accordance with the City’s Street Standards.
Clearances to other utilities/structures
Laterals shall be installed with a ten-foot minimum horizontal separation to water service lines.
Cleanouts
Each lateral shall have an approved cleanout. Cleanouts shall be located approximately six inches (6”) from the property line on private property (at the right-of-way or easement line).
Backflow prevention devices
Backflow prevention devices shall be incorporated as part of the cleanout on all new lateral installations. Backflow prevention devices shall be installed on existing laterals during remodeling or if new plumbing fixtures are added to a home.
Connection to mains
1. No sewer laterals smaller than eight inches shall be connected to manholes.
City of Brisbane – Sewer System Management Plan 63
2. Lateral connections to existing mains may be made by tapping the existing main only when the lateral diameter is less than or equal to three-fourths (0.75) the main line size. If this ratio is exceeded, the connection shall be made by removing a section of the main line and installing a properly sized wye fitting. Laterals eight inches in diameter and larger shall connect to the mainline at a manhole.
3. Laterals shall be constructed perpendicular to the main line and shall intersect the property line a minimum of five feet from the property corners. Exceptions will be made in the case of cul-de-sacs where perpendicular service lines are not practical.
PRESSURE SYSTEMS
Materials
All pressure systems shall utilize heat-fused high-density polyethylene (HDPE) pipe meeting Specification Section 15066, or PVC pipe meeting American Water Works Association (AWWA)’s C900 specifications with appropriate couplings.
Sizing
Pressure mains shall be sized to accommodate anticipated peak flow rates based on hydraulic calculations for downstream pump sizing. Hydraulic calculations showing pump and pipeline sizing shall be submitted to the City Engineer for approval.
Alignment
1. Depth
Pressure mains shall be installed with a minimum of three feet of cover. Installation at shallower depths shall be at the discretion of the City Engineer and may require alternate pipe material.
2. Slope
Pressure mains shall be installed to avoid bellies.
3. Cover/trench requirements
Minimum cover over pressure mains shall be three feet.
Clearances to other utilities/structures
1. Pressure mains shall be installed a minimum of 10 feet horizontally from all structures.
2. Pressure mains shall have a minimum one foot clearance to all other utilities. Installations with lesser clearances are at the City’s discretion and may require alternate pipe materials.
City of Brisbane – Sewer System Management Plan 64
3. Pressure mains shall be installed beneath water lines and storm drain lines by a minimum of 18 inches (crown of sewer line to invert of water or storm drain line).
Air release/vacuum valves
Air release/vacuum valves shall be installed at all high points along the pressure main alignment.
MANHOLES
Frequency/Location
1. Manholes shall be located at all sewer main intersections, at all changes in vertical or horizontal alignment, pipe size, or grade, where laterals larger than eight inches are connecting to a main, and at the beginning and end of curved sewer sections.
2. Manhole spacing shall be 300 feet, at a maximum. Manholes shall be installed at all terminating sewer mains longer than 100 feet.
3. All manholes shall be located in such a way that maintenance vehicles will have year-round access.
4. Monitoring manholes may be required at commercial/industrial service connections at the direction of the City. A monitoring manhole shall be required on all new construction or renovations or modifications to existing facilities, where the discharge originating in the new, renovated, or modified facility is, or will have the potential to be, non-domestic in nature. All waste from the facility shall flow through the monitoring manhole.
Type
1. Drop manholes are not recommended, but in cases where justification can be shown, limited use of such designs will be considered. Elevation drop through manholes shall be a minimum of 0.2 ft. Inside drops shall have a maximum drop of 2 ft. Drops greater than 2 ft shall be constructed with outside drop structures. Where unequal pipe diameters enter a manhole, crown of pipes shall be at the same elevation.
2. Flat top manholes shall be used where the distance from the invert to the rim is less than six feet. Manholes greater than six feet deep shall be constructed with standard cone sections.
Materials
1. Manholes shall be constructed using Class A concrete.
2. Manhole joints shall be made watertight using neoprene gaskets, subject to City Engineer approval.
3. New connections to existing manholes shall be made with neoprene adapter boots.
City of Brisbane – Sewer System Management Plan 65
Sizing
1. Manholes 48 inches in diameter may be used for sewer mains up to 18 inches in diameter and up to 15 feet deep. Manholes 60 inches in diameter may be used for sewer mains up to 42 inches in diameter and up to 22 feet deep, or where the alignment of the main lines is such that the distance between openings would be less than 1.5 feet with a smaller manhole.
2. Manhole necks shall be adjusted to finished grade by the use of concrete grade rings with approved sealant between each ring. The maximum height of grade rings shall be 12 inches for new construction and 18 inches for modifications to existing manholes. Adjustments beyond these limits shall be made with full barrel sections.
Lining
Downstream transition manholes originating from a pump station or manholes where turbulence is a factor may be required to be coated with hydrogen sulfide-resistant material.
TESTING AND ACCEPTANCE REQUIREMENTS
General
1. All gravity and pressure sewer pipes and service laterals shall be tested for exfiltration and/or infiltration and deflection.
2. Sanitary sewer systems shall be subjected to an air or water pressure test, as approved by the City Engineer.
3. Sewer lines shall be television-inspected at the City’s discretion.
4. Manholes shall be hydrostatically tested for leakage after installation, but prior to being backfilled. Prior to hydrostatic testing, all manholes shall be visually inspected for leaks. All leaks or cracks shall be repaired prior to hydrostatic testing, to the satisfaction of the Public Works Inspector.
MAINTENANCE REQUIREMENTS
The City maintains all public sewer mains, manholes and lift stations.
Property owners own and are required to maintain the lateral from the connection at the structure to the main line. Tree root intrusion, grease buildup, cracks, breaks, etc., are all the responsibility of the property owner.
City of Brisbane – Sewer System Management Plan 66
APPENDIX E
Municipal Code Sections
Fats, Oils, and Grease
13.04.480 - Discharge of substances causing obstructions to public sewers prohibited.
No person shall discharge, deposit, throw, or cause, allow, or permit to be discharged, deposited, or thrown, into any public sewer or into any plumbing fixture, manhole, or private sewer or drain connected to a public sewer, any substance of any kind whatever tending to obstruct or injure the sewage works, or to cause a nuisance or hazard, or which will in any manner interfere with the proper operation or maintenance of the sewage works in the opinion of the director. (Ord. No. 591, § 1, 3-19-15)
13.04.490 - Prohibited discharges to public sewers.
A. Except as hereinafter provided, no person shall discharge or cause to be discharged any of the following waters or wastes into any public sewer:
1. Any liquid or vapor having a temperature detrimental to the sewer system;
2. Any gasoline, benzene, naphtha, fuel oil, or other flammable or explosive liquid, solid, or gas;
3. Any water or waste which contains excessive amounts of grease, oil, or fats;
4. Any garbage, except properly ground garbage from individual dwelling units, as specified in Section 13.04.530
5. Any sand, cement, cinders, ashes, metal, glass or other heavy solids; any straw, shavings, animal hair, feathers, paunch manure, or other fibrous matter; and tar, asphalt, resins, plastics, or other viscous substance; or any other matter of such a nature as to obstruct the flow in sewers or as to cause other interference with the proper operation of the sewage works;
6. Any water or waste containing excessive amounts of acid, alkali, or dissolved sulfide, or having any other corrosive property capable of causing damage or hazard to structures, equipment, or personnel of sewage works;
7. Any waters or wastes containing a toxic or poisonous substance in sufficient quantity to injure or interfere with any sewage treatment process, to constitute a hazard to humans or animals, or to create a hazard in the waters receiving effluent from the sewage treatment plant;
City of Brisbane – Sewer System Management Plan 67
8. Any waters or wastes containing suspended solids or dissolved matter of such character and quantity that unusual attention or expense is required to handle such materials at the sewage treatment plant;
9. Any noxious or malodorous gas or substance capable of creating a public nuisance;
10. Any radioactive wastes, as provided in Sections 13.04.540 and 13.04.550 B. Whenever deemed necessary by the director, the owner shall, at his own expense, provide such treatment or take such other measures as shall be required in order to reduce the objectionable characteristics, contents, or rate of discharge of waters or wastes being deposited in the sewer, so that the same may be received therein without any damage to the sewage works or any undue interference with its operation and without any hazard of any kind to humans or animals. (Ord. No. 591, § 1, 3-19-15)
13.04.500 - Restrictions on quantity and character of wastes.
A. The admission into the public sewers of any wastes or waters having an average daily flow greater than two percent (2%) of the average daily flow at the sewage treatment plant, or having any of the following characteristics, shall be subject to the review of the director:
1. Temperature in excess of one hundred fifty degrees (150°) Fahrenheit, approximately sixty-five and six-tenths degrees (65.6°) Centigrade;
2. Suspended solids, or matter which upon dilution with water or sewage results in the formation of suspended solids, in excess of five hundred (500) parts per million;
3. Biochemical oxygen demand in excess of four hundred (400) parts per million;
4. Floatable grease of animal or vegetable origin in excess of fifty (50) parts per million, and of mineral origin in excess of fifteen (15) parts per million, or dispersed grease in excess of six hundred (600) parts per million;
5. A pH of less than five and five-tenths (5.5) or more than ten and five-tenths (10.5);
6. Dissolved sulfides in excess of one part per million.
7. Discharge characteristics that in the opinion of the director may adversely affect the public sewers or sewage works.
B. The provisions of subsection A and the values therein set forth shall not be regarded or construed as regulating or limiting the quantity or character of any specific
City of Brisbane – Sewer System Management Plan 68
industrial waste which may be received into the sewer system, but shall serve as a guide in the administration of this chapter for the purpose of determining, in general, the acceptability of waste for admission into the sewer system.
C. In addition to the provisions of subsections A and B, whenever the city is provided wastewater treatment by the city and county of San Francisco, wastewater dischargers shall also comply with the "Permit Provisions" of the Industrial Waste Article of the San Francisco Public Works Code.
1. The general manager of the public utilities commission of San Francisco will require dischargers to obtain a class I permit authorizing wastewater discharge if they meet the definition of a significant industrial user; (1) a person subject to categorical pretreatment standards; (2) a person discharging twenty-five thousand (25,000) gallons per day or more of wastewater, excluding sanitary, noncontact cooling and boiler blowdown wastewater; (3) a person discharging wastewater that constitutes five percent (5%) or more of the average dry weather hydraulic or organic (BOD, TSS) capacity of the tributary water pollution control plant; or (4) a person discharging a wastestream that, in the opinion of the general manager, will or may adversely affect the sewerage system by causing interference, pass-through of pollutants, sludge contamination, or endangerment of city workers.
2. The general manager may require minor dischargers (i.e., a person other than a significant industrial user) to obtain a class II permit if necessary to further the objectives of the industrial waste article. (Ord. No. 591, § 1, 3-19-15)
13.04.520 - Grease, oil and sand interceptors.
Grease, oil and sand interceptors shall, at the expense of the owner or tenant, be provided in all commercial plumbing systems, new or existing, for those establishments producing liquid waste containing, or likely to contain, any flammable substance or sand or quantities of grease in excess of the amounts set forth in Section 13.04.500. Interceptors shall conform with all requirements of the plumbing code of the city insofar as the same are applicable, shall be of a type and capacity approved by the director, and shall be so located as to be readily and easily accessible for cleaning and inspection. Where installed, all grease, oil and sand interceptors shall be maintained by the owner, at his expense, in a continuously efficient operation. (Ord. No. 591, § 1, 3-19-15)
13.04.530 - Admittance of properly ground garbage into sanitary sewer.
Garbage, fruit, vegetable, animal or other solid kitchen waste materials from individual dwelling units, resulting from the preparation of any food or drink, may be admitted into the sanitary sewer if first passed through a mechanically operated grinder so designed that:
A. It shall operate with cold water flowing into the grinder and through the sink drain line in such manner as to congeal and aerate the solid and liquid greases within the grinding unit;
City of Brisbane – Sewer System Management Plan 69
B. It shall discharge wastes at a reasonably uniform rate in fluid form, which shall flow readily through an approved trap, drain line, or soil line in a manner which prevents clogging or stoppage of the drain line;
C. It shall be of such construction and have such operating characteristics that not more than five percent (5%) by weight of all material discharged from it shall have any dimension larger than one-fourth (¼) inch, and no particle shall have any dimension greater than one-half (½) inch. Weights shall be determined on a dry basis; D. It shall be self-scouring, with no fouling surfaces to cause objectionable odors; E. It shall be free from electrical or mechanical hazards and shall adequately protect the user against injury during operation;
F. It shall be permanently connected to the drain in compliance with the plumbing code of the city and shall be free from cross-connection to any water pipe; and G. The entire installation shall comply in all particulars with the provisions of the plumbing and electrical codes of the city.
The decision as to the sufficiency of the design to meet these requirements shall rest with the director. (Ord. No. 591, § 1, 3-19-15)
City of Brisbane – Sewer System Management Plan 70
APPENDIX F
WATER QUALITY MONITORING PLAN
Introduction
This Water Quality Monitoring Plan describes the sampling and analytical methodology along with data management protocol that will be used by the Water Quality Technician to gather water quality data in the event of sanitary sewer spill of greater than 50,000 gallons, and the time frame for the events. The water quality sampling results will enable authorities to prioritize areas of concern with regard to water quality impacts.
Contact: Caleb Cayago at 415-508-2138 (office) and 415-218-3584 (cell) Surface Water Sampling Procedures
Surface water samples will be collected using the direct grab sampling technique. New, sterile, nitrile powder-free surgical gloves will be worn by sampling personnel at all times during sampling. Sampling gloves will be changed between sampling locations.
Samples will be collected in the following order using the procedures recommended by US EPA for surface water sampling.
Order of sampling:
1. Ammonia
2. Fecal coliform
3. E. coli
Equipment and supplies
1. Cooler with blue ice
2. Sterile bacterial sampling bottles with or without preservative 3 per location (one may serve as duplicate for QC purpose
3. Gloves
4. Marking pen (water resistant of permanent sharpies)
5. Clean bucket/bailer in case need
6. Paper towels
7. Decontamination solution and a disposal bucket for storing liquid waste
8. Field log forms
9. Chain of custody and labels
10. Contact information for the Field supervisor
City of Brisbane – Sewer System Management Plan 71
Procedure:
Collect one water sample, each day of the duration of the spill at each location listed under steps 5 and 6 below using the following procedures:
1. Determine the point that the spill is discharged into waterway.
2. If the spill is occurring, the “point of discharge” location is the point where the spill is entering the waterway.
3. If sampling is performed after the spill has stopped, calculate the approximate downstream distance from the original spill location by dividing the time since the spill occurred by the estimated velocity. The velocity may be estimated by observing or dropping floatable debris in the surface water and timing how long it takes to travel over a measured distance.
4. Put on safety gloves and safety glasses.
5. Flow in Drainage Conveyance System (DCS) Prior to Discharge Sampling a. If sewage discharges to a surface water via a drainage conveyance system, collect the water sample from the manhole or other accessible structure located closest to the discharge point before the drainage conveyance system low discharges to a receiving water. Label the sample bottle “DCS-001” with the date and time. i. Take a photo of the sample location, including a reference point in the photo. ii. Fill the three labeled bottles against the direction of the water flow. Avoid sampling debris or scum layer from the surface.
6. Receiving Surface Water (RSW) Sampling
b. Upstream of Point of Discharge Sample Collection: Collect the upstream samples first from a point in the receiving water of the point of sewage discharge to capture ambient conditions absent of sewage discharge impacts. Move approximately one hundred feet (100ft) upstream of the discharge location. Label the sample bottle “RSW-001U” with the date and time.
i. Take a photo of the sample location, including a reference point in the photo. ii. Fill the three labeled bottles against the direction of the water flow. Collect samples well away from the bank, preferably at a point where water is visibly flowing. Avoid sampling debris or scum layer from the surface.
c. Point of Discharge Sample Collection: Collect the “point of discharge” samples next.
Move approximately ten feet (10ft) downstream of the point in the receiving water where sewage initially enters the receiving water. Label the sample bottle “RSW-001” with the date and time.
i. Take a photo of the sample location.
ii. Fill the labeled bottles against the direction of the water flow. Collect samples well away from the bank, preferably at a point where water is visibly flowing. Avoid sampling debris or scum layer from the surface.
d. Downstream Sample Collection: Lastly, collect the downstream of point of discharge sample. Move one hundred feet (100ft) downstream of the source location. Label the sample bottle “RSW-001D” with the date and time.
City of Brisbane – Sewer System Management Plan 72
i. Take a photo of the sample location.
ii. Fill the labeled bottles against the direction of the water flow. Collect samples well away from the bank, preferably at a point where water is visibly flowing. Avoid sampling debris or scum layer from the surface.
7. Submerge collection container into the water to the depth of 6 to 10 inches carefully to avoid:
a) contamination from land and surface debris; and b) losing the preservative tablet (sodium thiosulfate) in the bottle.
8. For safety reasons, it may not be possible to collect a bacteria sample directly into the sterile container. A clean bucket may be used to collect the sample then the sample transferred to the sterile container.
9. Alternatively, a clean sanitized bailer may be lowered into the receiving water to collect and transfer water into sterile containers sterile to minimize any possibility of contamination of the sample.
10. Fill bacterial container to the 125 ml mark, make sure there are enough containers/location to accommodate the testing needs.
11. Screw the caps on each bottle securely to avoid leakage. Avoid touching the inside of the sample bottle(s) or the cap(s).
12. Repeat the sampling process with the remaining containers.
13. Log all samples onto a Chain of Custody Document and place all samples in cooler with Blue ice. If exterior of the bottles get contaminated with highly turbid water, rinse the exterior of the bottles with deionized water before placing into the cooler.
14. If the receiving water has no flow during the duration of the spill, report “No Sampling Due to No Flow” for its receiving water sampling locations.
Fecal coliform and E. coli samples must be delivered to the laboratory within approximately five hours of sample collection to meet the six-hour holding time for these analyses.
Laboratory Quality Control Policy
Maintain an updated ELAP certification
Participate in third party proficiency testing
Ensure sample is analyzed within its hold time of 6 hrs Analyze Ten percent of the samples collected in duplicate to establish levels of precision. Determine the acceptance and rejection of data based on established Control limits Field sampling Quality Control Policy
Ten percent of the samples collected will be used for quality control purposes. Duplicate samples will be used to determine laboratory method precision. Replicate samples will be used to determine representativeness of sampling. Field samples may be split for inter-laboratory comparisons.
City of Brisbane – Sewer System Management Plan 73
All field instruments used in the measurement of physical, chemical, or biological parameters shall be properly calibrated and maintained. Records will be kept of these operations for each instrument.
Decontamination of clean buckets and or bailer if used prior to sampling at a different location
All liquid waste generated from decontamination must be collected and disposed of by the City
City of Brisbane – Sewer System Management Plan 74
APPENDIX G
SPILL REPONSE PLAN &
FIELD RESPONSE DOCUMENTATION PACKET
City of Brisbane – Sewer System Management Plan 75
CITY OF BRISBANE
SPILL RESPONSE PLAN
CHAIN OF COMMAND ● EMERGENCY CONTACT LIST ● INITIAL
ASSESSMENT
CONTAINMENT ● CLEANUP ● CATEGORIES ● REPORTING
INSTRUCTIONS
Contents
SPILL – PUBLIC WORKS CHAIN OF COMMAND ........................................................... 76 BRISBANE PUBLIC WORKS EMPLOYEE CONTACT LIST -2016 ................................ 77 SPILL INITIAL ASSESSMENT FLOW CHART .................................................................. 78 SPILL CONTAINMENT/RECOVERY FLOW CHART ...................................................... 79 SPILL CLEANUP/DOCUMENTATION FLOWCHART ..................................................... 80 SPILLSO CATEGORIES .......................................................................................................... 81 SPILL CATEGORY 1 NOTIFICATION / REPORTING REQUIREMENTS ................... 82 SPILL CATEGORIES 2,3,PRIVATE LATERAL NOTIFICATION / REPORTING REQUIREMENTS ...................................................................................................................... 83 SPILL REPORTING INSTRUCTIONS .................................................................................. 84
City of Brisbane – Sewer System Management Plan 76
SPILL RESPONSE - ORDER OF COMMUNICATION
1st
• Public Works Sanitary System Utility Team Leader:
• Kessel Crockett
628-219-2917
2nd
• Public Works Utility Team Supervisor:
• Dustin Cohn
415-629-1435
3rd
• Deputy Director, Public Works - Utilities:
• Jerry Flanagan
• Office: 415-508-2137
• Cell: 415-321-0047
4th
• Director of Public Works / City Engineer:
• Maz Bozorginia
• Office: 415-508-2131
• Cell: 628-219-2918
City of Brisbane – Sewer System Management Plan 77
BRISBANE PUBLIC WORKS EMPLOYEE CONTACT LIST -2026
Employee Title Office Cell
Maz Bozorginia Director of Public Works (415) 508-2131 (628) 219-2918 Jerry Flanagan Deputy Director of Public Works -
Utilities (415) 508-2137 (415) 321-0047
Diane Cannon Administrative Assistant (415) 508-2130 (415) 519-0748 Dustin Cohn Public Works Supervisor (415) 508-2105 (415) 629-1435 Kessel Crockett Public Works Sanitary System Utility
Team Leader (415) 508-2130 (628) 219-2917
Juan Higareda Maintenance Utility Worker (415) 508-2130 (415) 254-0490 Gustavo Lule Maintenance Utility Worker (415) 508-2130 (415) 298-2886 Daniel
Hernandez Maintenance Utility Worker (415) 508-2130 (415) 215-8526 Devin Gutierrez Maintenance Utility Worker (415) 508-2130 (415) 205-6957 Graziano Sibillo Maintenance Utility Worker (415) 508-2130 (415) 696-1007 Chris Redfield Maintenance Utility Worker (415) 508-2130 (650) 291-8845 Jerome Strain Maintenance Utility Worker (415) 508-2130 (415) 645-3880 Varies Public Works 24 hour
On-Call Staff N/A (415) 286-0164
Bob Sage GIS Manager (415) 508-2121 (415) 203-8897
Greg Morris Public Works Inspector (415) 508-2130 (415) 760-3053 Caleb Cayago Water Quality Technician (415) 508-2138 (415) 218-3584 Matthew Lee Assistant Engineer - Utilities (415) 508-2128 (415) 530-8990 Alexander Joel Engineering Technician (415) 508-2130 (415) 713-9266 Keegan Black Maintenance Team Leader -
Buildings and Grounds (415) 508-2130 (628) 224-4998
Dolan Shoblo
Maintenance Program
Manager/Regulatory Compliance
Manager
(415) 508-2130 (415) 533-1681
Andrew
Rehberg Harbor Master (650) 583-6975 (415) 510-6234
Dispatch Brisbane Police (415) 467-1212 911
Engine 81 Brisbane Fire (415) 657-4300 (415) 716-0414
Battalion Chief (650) 740-7386 911
Dispatch San Mateo County (650) 368-1421 911
Company Nurse (650) 742-7110
City of Brisbane – Sewer System Management Plan 78
SPILL INITIAL ASSESSMENT FLOW CHART
ADDRESS ANY
IMMEDIATE HEALTH
AND SAFETY IMPACTS
THEN:
CALCULATE VOLUME
AND TAKE PHOTOS TO
DOCUMENT METHOD
IDENTIFY OVERFLOW
DESTINATION
CATCH BASIN
GROUND
GUTTER
CALL FOR BACKUP IF
NEEDED
(see Employee Contact
List)
PROCEED WITH
CONTAINMENT AND
RECOVERY STEPS
(see next chart)
IMMEDIATELY CONTACT:
PUBLIC WORKS
SUPERVISOR OR
DEPUTY DIRECTOR
IF:
SEWAGE REACHES A
BODY OF WATER OR
DRAINAGE CHANNEL
SEWAGE REACHES A
STORM DRAIN OR CATCH
BASIN AND IS NOT FULLY
CAPTURED
SPILL IS 1,000 GALS.
OR MORE
SPILL FROM CITYOWNED LATERAL IS 50
GALLONS OR MORE
TAKE PHOTOS OF
DISCHARGE AND FLOW
DEPTH/RATE/ETC...
City of Brisbane – Sewer System Management Plan 79
SPILL CONTAINMENT/RECOVERY FLOW CHART
BEGIN CONTAINMENT
/RECOVERY
STEP 1
IF THERE IS
POTENTIAL FOR
PUBLIC CONTACT:
ISOLATE THE AREA
USING CONES,
BARRICADES, TAPE,
ETC...
SET UP TRAFFIC
CONTROL
STEP 2
CONTAIN SPILL BY
TAKING THESE STEPS:
PLUG OR COVER CATCH
BASIN COVERS AND
STORMDRAINS - USING
SANDBAGS
EXCAVATE FOR
CONTAINMENT IF
NEEDED
SET UP VACTOR OR
TRASH PUMPS TO
RECOVER SPILL
STEP 3
CORRECT BLOCKAGE
SET UP EQUIPMENT AT
DRY MANHOLE OR
CLEAN OUT AND BEGIN
CLEARING LINE
CAPTURE AND
REMOVE MATERIAL
FLOWING FROM
BLOCKAGE
ASSESS FLOWING
MATERIAL TO
DETERMINE CAUSE
VIDEO INSPECT LINE
AND ADD TO
MAINTENANCE LIST
(if needed)
TAKE PHOTOS OF ALL
CONTAINMENT/
RECOVERY EFFORTS
City of Brisbane – Sewer System Management Plan 80
SPILL CLEANUP/DOCUMENTATION FLOWCHART
TAKE PHOTOS OF
CLEANUP EFFORT
COLLECT ALL
SOLIDS AND
LIQUID MATERIAL
CLEAN IMPACTED
STORM DRAIN
LINES AND CATCH
BASINS
WASH AND
DISINFECT AREA
AND DRAINAGE
CONVEYANCE
SYSTEM :
ONLY IF ALL
WASHWATER AND
DISINFECTANT CAN
BE CAPTURED AND
REMOVED WITH
PUMPS OR VACTOR
TAKE PHOTOS OF
CLEANED UP AREA
TAKE PHOTOS OF
DRAINAGE
CHANNEL OR
OTHER RECEIVING
WATER BODY
ASSESS IMPACT TO SURFACE
WATER - DOCUMENT VOLUME
AND TAKE PHOTOS
OF DRAINAGE CHANNEL
FILL OUT SPILL
RESPONSE FIELD
DOCUMENTATION
PACKET
CALCULATE SPILL
VOLUME ESTIMATE
CALCULATE
VOLUME ESTIMATE
RECOVERED TO
SANITARY SEWER
CALCULATE
VOLUME ESTIMATE
OF SPILL THAT
REACHED BODY OF
WATER (i.e. the Bay,
Lagoon, creek, etc.)
PROVIDE
DOCUMENTATION TO
SUPPORT ALL VOLUME
CALCULATION
ESTIMATES
TRACK
CHRONOLOGY OF
EVENT :
DATE AND TIME
CALL RECEIVED
IF NO START TIME IS WITNESSED
ADD 30 MINUTES TO TIME SPILL
WAS FIRST OBSERVED FOR ALL
REPORTING AND CALCULATIONS
TIME CREW ARRIVED
TIME SPILL CEASED
TIME CLEAN UP
COMPLETED
IDENTIFY PROBABLE
CAUSE OF
BLOCKAGE
PROVIDE PHOTOS AND
ALL DOCUMENTATION
OF INCIDENT TO TEAM
LEADER
City of Brisbane – Sewer System Management Plan 81
SPILL CATEGORIES
SPILL CATEGORIES
CATEGORY 1
RESULTING FROM FAILURE
IN CITY'S SANITARY SYSTEM
ANY VOLUME OF
DISCHARGE THAT
RESULTS IN THE
FOLLOWING:
DISCHARGE TO
SURFACE WATER OR
DRAINAGE CHANNEL
TRIBUTARY TO
SURFACE WATER
DISCHARGE TO STORM
DRAIN PIPE THAT IS
NOT FULLY CAPTURED
OR RECOVERED TO
SANITARY
CATEGORY 2
RESULTING FROM FAILURE
IN CITY'S SANITARY SYSTEM
DISCHARGE OF 1,000
GALLONS OR GREATER
THAT MEETS THE
FOLLOWING:
DOES NOT REACH
SURFACE WATER, A
DRAINAGE CHANNEL,
OR STORM PIPELINE
REACHES THE ABOVE
BUT IS FULLY
RECOVERED AND
DISPOSED OF
PROPERLY OR THE
STORM DRAIN
DISCHARGES TO A
DEDICATED
SOTRMWATER
INFILTRATION BASIN
CATEGORY 3
RESULTING FROM FAILURE
IN CITY'S SANITARY SYSTEM
DISCHARGE OF
EQUAL TO OR
GREATER THAN 50
GALLONS BUT LESS
THAN 1,000
GALLONS THAT
MEETS THE
FOLLOWING:
DOES NOT REACH
SURFACE WATER, A
DRAINAGE CHANNEL,
OR STORM PIPELINE
REACHES THE ABOVE
BUT IS FULLY
RECOVERED AND
DISPOSED OF
PROPERLY OR THE
STORM DRAIN
DISCHARGES TO A
DEDICATED
SOTRMWATER
INFILTRATION BASIN
CATEGORY 4
RESULTING FROM FAILURE
IN CITY'S SANITARY SYSTEM
ALL OTHER
DISCHARGES OF
SEWAGE FROM A
FAILURE IN CITY'S
SANITARY SYSTEM
PRIVATE LATERAL
SEWAGE DISCHARGE
OVERFLOWS CAUSED
BY BLOCKAGES TO
PRIVATE LATERALS
City of Brisbane – Sewer System Management Plan 82
SPILL CATEGORY 1 NOTIFICATION / REPORTING REQUIREMENTS
California Integrated Water Quality System: http://ciwqs.waterboards.ca.gov/ California State Office of Emergency Services: 1-800-852-7550 San Mateo County Environmental Health: (650) 372-6200
Regional Water Quality Control Board (RWQCB): (510) 622-2369 *Notify RWQCB within three (3) business days if an individual spill is 50 gallons or greater from City owned and/or operated laterals.
CATEGORY 1
ALL CATEGORY 1 NOTIFICATIONS AND REPORTING TO BE HANDLED BY THE DEPUTY
DIRECTOR OR THE PUBLIC WORKS SUPERVISOR OR THE UTILITY TEAM LEADER (WHEN
POSSIBLE)
1,000 GALLONS OR
GREATER
NOTIFY CAL OES
WITHIN 2 HOURS
1-800-852-7550
OR WHEN
NOTIFICATION CAN BE
PROVIDED WITHOUT
IMPEDING CLEANUP OR
OTHER EMERGENCY
MEASURES
OBTAIN A
NOTIFICATION
CONTROL NUMBER
PROVIDE UPDATES TO
CAL OES REGARDING
SUBSTANTIAL
CHANGES TO VOLUME
OR IMPACT OF
DISCHARGE
SUBMIT DRAFT
REPORT WITHIN
THREE BUSINESS
DAYS ONLNE TO
CIWQS
ENTER AND
CERTIFY REPORT
WITHIN 15 DAYS
OF SPILL END
DATE ONLINE BY
LEGALLY
RESPONSIBLE
OFFICAL TO
CIWQS
LESS THAN 1,000
GALLONS
SUBMIT DRAFT
REPORT WITHIN
THREE BUSINESS
DAYS ONLNE TO
CIWQS
ENTER AND
CERTIFY REPORT
WITHIN 15 DAYS
ON LINE BY
LEGALLY
RESPONSIBLE
OFFICAL TO
CIWQS
MORE THAN 50,000
GALLONS
FOLLOW ALL
STEPS FOR
CATEGORY 1
1,000 GALLONS
OR GREATER
PLUS:
SUBMIT SPILL
TECHNICAL
REPORT WITHIN
45 DAYS
ONLINE BY
LEGALLY
RESPONSIBLE
OFFICIAL TO
CIWQS
CONDUCT
MANDATORY WATER
QUALITY SAMPLING
(WITHIN 48 HOURS).
REFER TO WATER
QUALITY MONITORING
PLAN
City of Brisbane – Sewer System Management Plan 83
SPILL CATEGORIES 2, 3, 4, AND PRIVATE LATERAL NOTIFICATION /
REPORTING REQUIREMENTS
California Integrated Water Quality System: http://ciwqs.waterboards.ca.gov/ Regional Water Quality Control Board (RWQCB): (510) 622-2369 *Notify RWQCB within three (3) business days if an individual spill is 50 gallons or greater from City owned and/or operated laterals.
REPORTING
REQUIREMENTS
CATEGORY 1
SEE SEPARATE
CHART
CATEGORY 2
SUBMIT DRAFT
REPORT WITHIN
THREE BUSINESS
DAYS ONLNE TO
CIWQS
ENTER AND
CERTIFY REPORT
WITHIN 15 DAYS
ON LINE BY
LEGALLY
RESPONSIBLE
OFFICAL TO
CIWQS
CATEGORY 3
SUBMIT AND
CERTIFY REPORT
WITHIN 30
CALENDER DAYS
OF THE END OF
THE MONTH
ONLINE BY
LEGALLY
RESPONSIBLE
INDIVIDUAL TO
CIWQS
CATEGORY 4
SUBMIT AND
CERTIFY REPORT
WITHIN 15
CALENDER DAYS
OF THE END OF
THE QUARTER
ONLINE BY
LEGALLY
RESPONSIBLE
INDIVIDUAL TO
CIWQS
PRIVATE SEWER
LATERAL
DISCHARGE
MAY BE
VOLUNTARILY
REPORTED TO
CIWQS AT THEIR
ON LINE
DATABASE
City of Brisbane – Sewer System Management Plan 84
SPILL REPORTING INSTRUCTIONS
California State Office of Emergency Services: 1-800-852-7550 When calling this number be prepared to report the following:
i. Identity of caller and direct return phone number.
ii. Estimated spill volume discharged (gallons).
iii. If ongoing, estimated spill discharge rate (gallons per minute). iv. Spill Incident Description:
a. Brief narrative.
b. On-scene point of contact for additional information (name and cell phone number).
c. Date and time Discharger became aware of the spill.
d. Name of sanitary sewer system agency causing the spill. e. Spill cause (if known).
v. Indication of whether the spill has been contained.
vi. Amount of the spill has been contained, if applicable. vii. Indication of whether surface water is impacted.
viii. Name of surface water impacted by the spill, if applicable. ix . Indication of whether a drinking water supply is or may be impacted by the spill. x. Any other known spill impacts.
xi. Spill incident location (address, city, state, and zip code).
California Integrated Water Quality System: http://ciwqs.waterboards.ca.gov/ San Mateo County Environmental Health: (650) 372-6200
Regional Water Quality Control Board: (510) 622-2369
City of Brisbane – Sewer System Management Plan 85
CITY OF BRISBANE
SPILL RESPONSE – FIELD DOCUMENTATION PACKET
Contents
CALLER (OBSERVER) INFORMATION ....................................................................................................... 86 SPILL TIMELINE ........................................................................................................................................ 86 SPILL CAUSE AND FAILURE LOCATION .................................................................................................... 87 SPILL LOCATION AND FINAL DESTINATION ............................................................................................. 88 SPILL CATEGORY / NOTIFICATION ........................................................................................................... 90 SPILL VOLUME ......................................................................................................................................... 90 CLEANUP/DISINFECTION OPERATIONS ................................................................................................... 91 SPILL VOLUME ESTIMATION METHODS .................................................................................................. 92 DURATION AND FLOW RATE METHOD ............................................................................................... 92 MEASURED VOLUME METHOD .......................................................................................................... 93 GUTTER FLOW ESTIMATION METHOD .............................................................................................. 18 EYEBALL ESTIMATION METHOD ......................................................................................................... 18 REPORTED BY:_________________________ REPORT DATE:____/____/____
City of Brisbane – Sewer System Management Plan 86
CALLER (OBSERVER) INFORMATION
CALLER (OBSERVER) INFORMATION
Caller (Observer)
Name: Caller phone #:
Time of initial call: AM PM Caller email:
Date of initial call: Call received by:
Service Request # Call assigned to:
Address on Ser.
Request:
Location where caller saw spill:
Did caller observe the start of the
spill?
YES
NO
If ‘YES’ – What time did spill start? AM PM
CALLER COMMENTS
Use separate paper if more room needed
SPILL TIMELINE
SPILL TIMELINE
Was start of spill witnessed or documented?* Documented start time:
AM
PM
Yes No Official spill start
time:*
AM
PM
Dispatch received
call:
AM
PM Name of dispatcher:
Dispatch calls Public
Works Employee:
AM
PM
Name of employee
who received call:
Employee contacts
Supervisor:
AM
PM
Name of supervisor
contacted:
Staff Arrives at spill: AM
PM Date:
Staff requests
additional employees
and equipment
AM
PM
List additional
employees and
equipment
requested:
Staff requests
additional employees
and equipment
AM
PM
List additional
employees and
equipment
requested:
Containment started: AM PM Date:
Spill stopped: AM
PM
Date:
City of Brisbane – Sewer System Management Plan 87
Blockage cleared: AM PM Date:
Spill cleaned up: AM PM Date:
Departure Time: AM
PM
Date:
TIMELINE COMMENTS
Use separate paper if more room needed
* If start of spill is not witnessed or otherwise documented (with photos showing spill hasn’t reached storm drain system or natural waterway) then add estimated 30 minutes to time spill was reported for Official spill start time. Adjust volume calculation estimate to reflect this additional 30 minutes (per RWQCB directive from March 4, 2016)
SPILL CAUSE AND FAILURE LOCATION
SPILL CAUSE
CHECK ALL THAT APPLY FROM LIST BELOW
ARV/BOV Failure City maintenance caused spill/blockage Construction debris Damage by others not related to City
Sewer Debris from lateral General debris
Rags Excess Flow Roots Grease (FOG)
Inappropriate discharge to City Sewer Natural disaster Non-dispersibles Operator Error Pipe Structural Problem /
Failure
Pipe Structural Problem -
Install
Pump Station Fail -
Controls
Pump Station Fail -
Mechanical
Pump Station Fail -
Power
Rainfall Exceeded
Design
Siphon
Failure Root Intrusion Surcharged pipe
Other – Describe: Vandalism
Was this spill related to a storm event? YES NO
SPILL CAUSE COMMENTS
City of Brisbane – Sewer System Management Plan 88
Use separate paper if more room needed
SPILL FAILURE LOCATION
CHECK ALL THAT APPLY FROM LIST BELOW
ARV/BOV Force main Gravity main line Lower lateral (public)
Manhole Siphon Upper lateral
(public)
Pump Station Fail -
Controls
Pump Station Fail -
Mechanical
Pump Station Fail -
Power
Other – Describe:
SPILL FAILURE QUESTIONS
Diameter of sewer pipe at the point of blockage or failure (inches):
Material of sewer pipe at the point of blockage or failure:
Estimated age of sewer asset at the point of blockage or failure (years):
SPILL FAILURE COMMENTS
Use separate paper if more room needed
SPILL LOCATION AND FINAL DESTINATION*
SPILL APPEARANCE LOCATION
Address or Location of spill:
Latitude of spill: Longitude of spill:
Number of appearance points: CHECK ALL THAT APPLY FROM LIST BELOW SS Backflow
Device
Combined Sewer
D.I. Force Main Gravity Mainline
Inside
Building/Struct Private lateral C.O. Public lateral C.O. Private lower lateral Lift Station Manhole (public) Manhole (private) Public lower lateral
Other - Describe Below: Public upper lateral Private upper lateral
City of Brisbane – Sewer System Management Plan 89
LOCATION COMMENTS
Use separate paper if more room needed
FINAL SPILL DESTINATION*
CHECK ALL THAT APPLY FROM LIST BELOW
Beach Building/Structure Storm drain Drainage Channel Paved Surface Unpaved Surface Street/Curb/Gutter Surface Water Other - Describe Below: Public upper lateral Private upper lateral
DESTINATION QUESTIONS*
Did the spill discharge to a drainage channel and/or surface water?* YES NO Did the spill reach a storm drainpipe that is not part of a combined sewer system? YES NO
If spill reached a separate drainpipe, was all of the wastewater fully captured from the separate storm drain and returned to the sanitary sewer system?
YES NO
N/A
Was the spill located within 1,000 feet of a municipal water intake or municipal groundwater well? YES NO
DESTINATION COMMENTS
Use separate paper if more room needed
* Photo Documentation of the Drainage Channel (or final receiving body) and spill entry points required in all spill instances.
City of Brisbane – Sewer System Management Plan 90
SPILL CATEGORY / NOTIFICATION
SPILL CATEGORIES*
1. Was the spill a Category 1* spill and ≥ 1,000 gallons? YES NO
1.a. If ‘YES’, was CAL OES notified within two hours? YES NO
2. Was there a discharge to a drainage channel and/or surface water? YES NO
2.a. If ‘YES’, was SMCO Environmental Health notified immediately? YES NO
3. Was there a discharge to a storm drain pipe that was “NOT” fully captured & returned to the SS system? YES NO
3.a. If ‘YES’, was SMCO Environmental Health notified immediately? YES NO
4. Was the spill ≥ 50 gallons and from public laterals? YES NO
4.a. If ‘YES’, was RWQCF notified within 3 business days? YES NO If answer is YES to questions 2 and 3 above, the Spill is a Category 1* *See Spill Emergency Response Plan for all categories and reporting requirements Standard Operating Procedures.
CAL OES: 1-800-852-7550 RWQCB: (510) 622-2369 SMCO Environmental Health: (650) 372-6200 SPILL VOLUME*
SPILL VOLUME*
a) Estimated spill volume that reached a separate storm drain that flows to a surface water body? gallons
b) Estimated spill volume recovered from the separate storm drain that flows to a surface water body? (Do not use water used for clean-up) gallons c) Estimated spill volume that directly reached a drainage channel that flows to a surface water body? gallons
d) Estimated spill volume recovered from a drainage channel that flows to a surface water body? gallons
e) Estimated spill volume discharged directly to a surface water body? gallons f) Estimated spill volume recovered from surface water body? gallons g) Estimated spill volume discharged directly to land?
(Includes discharges directly to land, and other non-surface water location.) gallons h) Estimated spill volume recovered from the discharge to land? (Do not include water used for cleanup) gallons
i) Estimated spill volume discharged directly to or through a storm drain system or drainage channel that flows to a stormwater
infiltration/retention structure, field, or building? gallons j) Estimated total spill exiting the SS system? gallons *See attached worksheets for spill volume calculations
City of Brisbane – Sewer System Management Plan 91
CLEANUP/DISINFECTION OPERATIONS
DESCRIBE CLEANUP/DISINFECTION OPERATIONS
Use separate paper if more room needed
City of Brisbane – Sewer System Management Plan 92
SPILL VOLUME ESTIMATION METHODS
The purpose of this worksheet is to capture the data and method(s) used in estimating the volume of a spill. It is useful to use more than one method, if possible, to validate your estimate.
VOLUME ESTIMATE METHODS *
CHECK ALL ESTIMATION METHODS USED*
Flow around MH cover Measured Volume
Method
Duration and Flow
Method
USD SSO Flow Rate Estimating
Tool Daily Per Capita Use Pump Station Meter
Flow from vent or pick holes Eyeball Estimate
Method
Other – Describe:
*SEE THE SEWER SPILL ESTIMATION GUIDE FOR DETAILED INSTRUCTIONS ON EACH METHOD
DURATION AND FLOW RATE METHOD
1. Start Date and Time:
2. End Date and Time:
3. Total time of spill (show time in minutes):
a. Total time + 30 minutes*:
4. Average flow rate GPM:
5. Total Volume Estimated (multiply line 3(a)
and 4):
* Add 30 minutes to the start time if start of spill is not witnessed or documented with photos
City of Brisbane – Sewer System Management Plan 93
MEASURED VOLUME METHOD (See page 6 of the Sewer Spill Estimation Guide) If not raining, the shape, dimensions, and depth of the spill may be used to estimate the volume.
Sketch spill with dimensions and depth (in feet)
Measure depth in several locations
1. Multiply (area) x (depth) to get volume: cu ft. Rectangle Area
2. Repeat as needed: cu ft. (length) x (width)
2. Repeat as needed: cu ft. Circle Area
2. Repeat as needed: cu ft. (dia) x (dia) x 0.785
3. Add volume from all shapes drawn to get Total
Volume: cu ft. Triangle Area
(base) x (height) x
0.5 4. Multiply (Total volume) x (7.48) to convert to
gallons: gallons
For spill of this shape draw 3 triangles, one circle, and one rectangle.
Measure depth for each shape in multiple locations and figure average.
EXAMPLE
City of Brisbane – Sewer System Management Plan 94
GUTTER FLOW ESTIMATION METHOD (See page 21 of the Sewer Spill Estimation Guide)
1. Drop a small floating object into the sewage flow and measure how far it floats in one second.
VELOCIT
Y (ft/sec)
2. Calculate the Area of flow in the gutter line in square inches.
Area of a triangle is 1/2 x Base x Height (common flow shape in gutter) AREA (in2)
3. Multiply: (in2) x .007 to get square feet (ft2) = AREA (ft2)
4. Multiply: (ft/sec) x (ft2) x 7.48 (gal/min) x 60
(sec/min) =
FLOW (gal/min)
5. Determine total spill time in minutes* TIME (min)
6. Multiply: (gal/min) x (min) = TOTAL SPILL VOLUME (gallons) * Add 30 minutes to the start time if start of spill is not witnessed or documented with photos Gutter Flow Estimation Example
For this example, let’s assume that a piece of bark floated 2ft in one second, when dropped into the sewage flow. Let’s assume that the spill lasted 16 minutes, but nobody witnessed the start, so we must add 30 minutes to bring our time to 46 minutes. 1 sq inch = .007 sq ft The area of a triangle is (1/2)Base x Height
1. That would mean that Velocity = 3ft/sec. Time = 46 minutes
2. The area of this flow would be (1/2) x 2” x 16” = 16 sq inches.
3. Convert 16 sq inches to sq ft. 16 x .007 = .112 The Area = .112 ft2
4. Flow = 2(ft/sec) x .112(ft2) x 7.48(gal/min) x 60 (sec/min)
5. Flow = 101(gal/min) x 46 minutes = 4,646 gallon Total Spill Volume EYEBALL ESTIMATION METHOD (See page 5 of the Sewer Spill Estimation Guide) Imagine amount of water that would spill from a bucket or barrel. This method useful up to 100 gallons.
This method should be used as a last resort if the other estimation methods aren’t available.
Size of bucket(s) or barrel(s) How
many? Mutliplier Estimated Volume
1 gallon water jug x1 gallons
5 gallon bucket x5 gallons
32 gallon trash can x32 gallons
55 gallon drum x55 gallons
Total Volume Estimated Using Eyeball Method gallons
2”
16”
Sewage flow in the gutter
City of Brisbane – Sewer System Management Plan 95
APPENDIX H
Lift Station Emergency Response Plans
Lift Station #1 – Map and Specs
Overview: This station has a standby diesel-powered generator that will operate the entire station in the event of a power failure. The generator exercises on a monthly basis. The station has a pressure transducer for pump operation and backup mechanical floats for alarms and pump control.
Number of Pumps: Two
Type of Pumps: (2) FLYGT submersible self-cleaning semi-open channel impeller pumps Model: NP 3127 HT Outlet: 4” dia.
Wet Well Size: 110” dia. X 120” deep (4,936 gallons) Operating Size: 110” x 48” (1,975 gallons) Average GPD: 1,481 gpd Firm Capacity: 200 gpm Total Capacity: 400 gpm Retention Time: approx. 8 hrs.
Vactor Access: MH on access path in front of lift station Generator: Standby Diesel Generator – 80 kw Caterpillar Olympian Model D80P4 – 126 hp 4 GPH consumption – 300-gallon tank
Alarm: High Level Beacon Light mounted on top of Station Control Panel Inspection Schedule: Daily Outlet: Force Main to Lift Station #4 on Sierra Pt Pkwy Percent of Service Area served by Lift Station: 1.8%
SSO Emergency Response Plan Lift Station #1 DATE: 05/02/2026 1: Catch Basin : Sandbag
2: Wet Well NOTES: In the event of an SSO from this Lift Station- Place Sandbags around Catch Basin
shown and along edge of path to divert waste
to low spot in field 3: MH (lowspot)
1 2
3
City of Brisbane – Lift Station Flow Chart
Lift Station Location Pumps To
LS #1 Brisbane Marina (near dock #3) LS # 4
LS #4 Sierra Point Parkway (Near overpass) VDLS
LS #5 3445 Bayshore Blvd – at Fire Station #81 VDLS
VDLS 125 Valley Drive San Francisco
(Valley Drive Lift Station)
VDLS
2,220 gpm
LS #5
100 gpm
LS #4
1,180 gpm
LS #1
200 gpm
(Force main from VDLS switches to
gravity main in MH at Bayshore
Lift Station 5 Blvd and Guadalupe Canyon Pkwy)
VDLS
Lift Station 4
Lift Station 1
Lift Station #4 – Map and Specs
Overview: This station has a standby diesel-powered generator to keep the station operational in the event of a power failure, which is exercised on a weekly basis. A pressure level transmitter controls pump operation and there are backup floats switches if the transmitter fails. In 2020, the entire lift station was upgraded to meet the demands of the new commercial developments at Sierra Point, which included upgrades such as a new wet well, piping, instrumentation, and a landfill gas detection and monitoring system. The wet well also contains two Franklin Miller Dimminutor channel grinders.
Number of Pumps: Three
Type of Pumps: (3) FLYGT submersible non-clog type Pumps Model NP 3153 SH 3 Impeller: 6.9” Dia Motor: 23 HP at 3510 RPM
Wet Well Size: 144” x 66” x 240” deep (9,875 gallons) Operating Size: 144” x 66” x 42” (1,728 gallons) Average GPD: 55,000 gpd Firm Capacity: 1,180 gpm Total Capacity: 1,770 gpm Retention Time: approx. 4 hrs.
Vactor Access: MH on access path in front of lift station Generator: Standby Diesel Generator – 60 kW Cummins Model C60C6C- Engine Model QSB5G13 – 173 hp 1 gph consumption –380-gallon tank
Alarm: SCADA Inspection Schedule: Daily Outlet: Force Main to VDLS Percent of Service Area served by Lift Station: 13.8%
SSO Emergency Response Plan Lift Station #4 DATE: 05/02/2026 1: Catch Basin : Sandbag
2: Wet Well NOTES: In the event of an SSO from this Lift Station- Place Sandbags around Catch Basin
shown and along edge of path to divert waste
to low spot in field 3: MH (lowspot)
1 2
3
City of Brisbane – Lift Station Flow Chart
Lift Station Location Pumps To
LS #1 Brisbane Marina (near dock #3) LS # 4
LS #4 Sierra Point Parkway (Near overpass) VDLS
LS #5 3445 Bayshore Blvd – at Fire Station #81 VDLS
VDLS 125 Valley Drive San Francisco
(Valley Drive Lift Station)
VDLS
2,220 gpm
LS #5
100 gpm
LS #4
1,180 gpm
LS #1
200 gpm
(Force main from VDLS switches to
gravity main in MH at Bayshore
Lift Station 5 Blvd and Guadalupe Canyon Pkwy)
VDLS
Lift Station 4
Lift Station 1
Lift Station #5 – Maps and Specs
Overview: The City of Brisbane’s Fire Station No. 81, located at 3445 Bayshore Boulevard, is managed by North County Fire Authority (NCFA). This fire station contains a wet well with two pumps operated by pressure transducers with backup mechanical floats for alarms and pump control. This wet well only serves the Fire House and is powered by the Fire House’s back-up generator. The City of Brisbane Public Works Department performs routine inspections and cleaning of this station and equipment, but repairs and equipment upgrades are the responsibility of NCFA.
Number of Pumps: Two
Type of Pumps: 3” x 3” Horizontal Self-Priming Sewage Pumps – 100 GPM – 208 volts Wet Well Size: 72” x 60” x 114” deep (2,131 gallons) Operating Size: 72” x 60” x 60” (1,112 gallons) Average GPD: 224 gpd Firm Capacity: 100 gpm Total Capacity: 200 gpm Retention Time: approx. 4-5 Days Vactor Access: MH on access path in front of lift station in driveway Generator: The Fire Department has a standby generator that also serves their lift station Alarm: High Level Beacon Light on top of Lift Station
Inspection Schedule: Daily Outlet: Force Main to VDLS
Percent of Service Area served by Lift Station: <1%
SSO Emergency Response Plan Lift Station #5 DATE: 05/02/2026 1: High Level Alarm
NOTES: In the event of an SSO from this Lift
Station- Shut off water usage at the Fire
Station and Vactor out wet well from manhole.
2: Control Panel
3: MH (wet well access)
1 2
3 The retention time of the wet well during normal
use is a minimum of four days.
In the event of a mechanical problem or long-term
power outage at this lift station – Staff should
monitor the wet well level at the manhole shown.
Remove sewage as needed with Vactor truck.
Contact Fire Department and ask to reduce water
usage for duration of problem, if issue last more
than four days.
Fire Department: (415) 467-8181
City of Brisbane – Lift Station Flow Chart
Lift Station Location Pumps To
LS #1 Brisbane Marina (near dock #3) LS # 4
LS #4 Sierra Point Parkway (Near overpass) VDLS
LS #5 3445 Bayshore Blvd – at Fire Station #81 VDLS
VDLS 125 Valley Drive San Francisco
(Valley Drive Lift Station)
VDLS
2,220 gpm
LS #5
100 gpm
LS #4
1,180 gpm
LS #1
200 gpm
(Force main from VDLS switches to
gravity main in MH at Bayshore
Lift Station 5 Blvd and Guadalupe Canyon Pkwy)
VDLS
Lift Station 4
Lift Station 1
Valley Drive Lift Station – Map and Specs
Overview: The City of Brisbane’s Valley Drive Lift Station (VDLS) is the primary sewage lift station for the City. It receives all of the gravity fed sewage from the town, the industrial park, as well as the force mains from lift stations #4 and #5. It operates on two small pumps and two large pumps which feed an 8” and 12” force main that converts to a gravity main at the Manhole at the intersection of Guadalupe Canyon and Bayshore Boulevard.
Number of Pumps: Four
Type of Pumps: (2) PACO submersible 8” pumps – Model 401221 Type QDSC (2) PACO submersible 12” pumps – Model 801421 Type QDSC Wet Well Size: 54” x 324” x 216” deep (16,359 gallons) Operating Size: 54” x 324” x 120” deep (9,088 gallons) Average GPD: 440,000 gpd Firm Capacity: 2,220 gpm Total Capacity: 3,820 gpm Retention Time: approx. 30-40 minutes Vactor Access: MH in driveway in front of station Generator: Standby Propane Generator – Cummins – Model GTA-28 – 450 kW –
6.4 MM BTU/hr. (70 gal/hr. propane)
(2) 500-gallon Propane Storage Tanks – kept at 50% min– on site Refill contact: Suburban Propane (408) 227-8464 Acct.# 25305 Alarm: SCADA
Inspection Schedule: Daily
Outlet: 8” & 12” Force Main to Gravity Main at Guadalupe Canyon and Bayshore Boulevard Percent of Service Area served by Lift Station: 97.4%
SSO Emergency Response Plan VDLS DATE: 05/02/2026
1: VDLS : Sandbag
2: Vactor Access : Swale
3: MH (low spot)
NOTES: In the event of a complete failure of
Valley Drive Lift Station, an SSO will occur
from MH 3 (low spot).
RESPONSE: Make a sandbag line on the low
side of MH 3 to divert overflow into the swale
and away from the storm drain.
4: Catch Basin
1 2
3 4
City of Brisbane – Lift Station Flow Chart
Lift Station Location Pumps To
LS #1 Brisbane Marina (near dock #3) LS # 4
LS #4 Sierra Point Parkway (Near overpass) VDLS
LS #5 3445 Bayshore Blvd – at Fire Station #81 VDLS
VDLS 125 Valley Drive San Francisco
(Valley Drive Lift Station)
VDLS
2,220 gpm
LS #5
100 gpm
LS #4
1,180 gpm
LS #1
200 gpm
(Force main from VDLS switches to
gravity main in MH at Bayshore
Lift Station 5 Blvd and Guadalupe Canyon Pkwy)
VDLS
Lift Station 4
Lift Station 1
City of Brisbane – Sewer System Management Plan 96
APPENDIX I
Brisbane/GVMID Sanitary Sewer System Map
16"
P a g e 1
P a g e 3
P a g e 1
³
0 250500750
1,000
Feet
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community, Sources: Esri, TomTom, Garmin, (c) OpenStreetMap contributors, and the GIS User Community, Esri, Inc., Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community Scale = 1:5,000 March 2026
S a n i t a r y S e w e r
G I S M a p S e r i e s
B r i s b a n e - C a l i f o r n i a
1 2 3
4 5
6 7
Sewer Force Main
SS Force Main - Brisbane
O v e r v i e w M a p
8"
8"
8"
8"
8"
8"
6"
8"
8"
6"
8"
8"
6"
6"
8"
6"
8"
8"
8"
6"
6"
6"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
6"
8"
8"
6"
8"
8"
8"
6"
6"
6"
8"
6"
6"
8"
8"
8"
8"
8"
8"
15"
8"
8"
6"
8"
6"
8"
8"
6"
8"
8"
8"
8"
6"
8"
8"
8"
8"
6"
8"
15"
8"
8"
8"
8"
6"
6"
8"
8"
8"
8"
8"
8"
8"
8"
15"
8"
8"
8"
8"
15"
15"
15"
8"
15"
P a g e 2P a g e 3
P a g e 2
P a g e 4
P a g e 2 ³
0 250500750
1,000
Feet
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community, Sources: Esri, TomTom, Garmin, (c) OpenStreetMap contributors, and the GIS User Community, Esri, Inc., Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community Scale = 1:5,000 March 2026
S a n i t a r y S e w e r
G I S M a p S e r i e s
B r i s b a n e - C a l i f o r n i a
1 2 3
4 5
6 7
Manhole
SSMH Brisbane
SSMH Private/Other Agency
Sewer Gravity Main
Our Agency
Private
O v e r v i e w M a p
16"
8"
12"
16"
16"
8"
6"
6"
6"
6"
6"
8" 6"
6"
8"
6" 8"
8"
6"
8"
6"
6"
8"
8"
6"
6 "
8"
8"
8"
8"
6"
6"
8"
8"
6 "
6"
8"
8"
6"
6"
8"
6 "
8"
8"
8"
8"
8"
6"
6"
8"
8"
8"
8 "
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
P a g e 1
P a g e 3
P a g e 2P a g e 3
P a g e 3
P a g e 5
P a g e 3
³
0 250500750
1,000
Feet
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community, Sources: Esri, TomTom, Garmin, (c) OpenStreetMap contributors, and the GIS User Community, Esri, Inc., Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community Scale = 1:5,000 March 2026
S a n i t a r y S e w e r
G I S M a p S e r i e s
B r i s b a n e - C a l i f o r n i a
1 2 3
4 5
6 7
Manhole
SSMH Brisbane
Sewer Gravity Main
Our Agency
Sewer Force Main
SS Force Main - Brisbane
O v e r v i e w M a p
8"
8"
10"
8"
15"
15"
15"
8"
8"
10"
8"
8"
10"
15"
8"
6"
8"
8"
8"
8"
8"
8"
8"
15"
15"
15"
15"
P a g e 2
P a g e 4
P a g e 4P a g e 5
P a g e 4
³
0 250500750
1,000
Feet
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community, Sources: Esri, TomTom, Garmin, (c) OpenStreetMap contributors, and the GIS User Community, Esri, Inc., Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community Scale = 1:5,000 March 2026
S a n i t a r y S e w e r
G I S M a p S e r i e s
B r i s b a n e - C a l i f o r n i a
1 2 3
4 5
6 7
Manhole
SSMH Brisbane
Sewer Gravity Main
Our Agency
O v e r v i e w M a p
6"
2"
6"
8"
12"
8"
8"
6"
8"
6"
6"
8"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
8"
6"
6"
6"
6"
6"
6"
12"
6"
6"
8"
6"
6"
6"
8"
6"
8"
8"
8"
8"
6"
6"
6"
6"
6"
6"
6"
8"
18"
6"
6"
6"
8"
6"
6"
6"
6"
6"
6"
6"
6"
8"
6"
6"
6"
6"
6"
8"
8"
6"
18"
6"
8"
6"
6"
8"
6"
6" 6"
8"
6"
6"
8"
8"
10"
8"
6"
6"
6"
10"
6"
8"
6"
6"
6"
6"
12"
6"
8"
8"
8"
10"
8"
6"
6"
6"
6"
8"
6"
10"
6"
6"
10"
10"
18"
6"
6"
15"
6"
6"
18"
6"
8"
6"
6" 8"
6"
8"
8"
8"
6"
8"
6"
12"
6"
6 "
8"
8"
8"
8"
6"
10"
8"
6"
8"
8"
8"
8"
18"
8"
6"
6"
Unknown
8"
6"
6"
6"
6"
6"
6"
8"
8"
6"
8"
8"
6"
6"
6"
6"
6"
12"
15"
12"
15"
6"
15"
12"
15"
6"
10"
6"
10"
12"
10"
6"
6 "
8"
6"
8"
12"
12"
6"
6"
18"
18"
18"
10"
6"
6"
12"
6"
10"
6"
12"
6"
12"
8"
10"
6"
8"
6 "
8"
6"
Fire House
Lift Station
Valley
Drive
Lift Station
P a g e 3
P a g e 5
P a g e 4P a g e 5
P a g e 5
P a g e 6
P a g e 5
³
0 250500750
1,000
Feet
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community, Sources: Esri, TomTom, Garmin, (c) OpenStreetMap contributors, and the GIS User Community, Esri, Inc., Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community Scale = 1:5,000 March 2026
S a n i t a r y S e w e r
G I S M a p S e r i e s
B r i s b a n e - C a l i f o r n i a
1 2 3
4 5
6 7
Sewer Lift Station
Lift Station
Relief Valve
Air Release Valve
Manhole
SSMH Brisbane
SSMH Private/Other Agency
Sewer Gravity Main
Our Agency
Private
Sewer Force Main
SS Force Main - Brisbane
O v e r v i e w M a p
8"
8"
8"
6"
6"
6"
6"
6"
6"
6"
6"
6"
10"
6"
6"
6"
6"
8"
6"
6"
8"
6"
6"
6"
6"
10"
6"
6"
6"
6"
8"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
8"
6"
6"
6"
6"
6"
6"
6"
8"
6"
6"
10"
6"
6"
8"
6"
10"
8"
6"
8"
8"
6"
6"
6"
8"
6"
8"
6"
6"
6"
6"
P a g e 5
P a g e 6
P a g e 6P a g e 7
P a g e 6
³
0 250500750
1,000
Feet
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community, Sources: Esri, TomTom, Garmin, (c) OpenStreetMap contributors, and the GIS User Community, Esri, Inc., Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community Scale = 1:5,000 March 2026
S a n i t a r y S e w e r
G I S M a p S e r i e s
B r i s b a n e - C a l i f o r n i a
1 2 3
4 5
6 7
Relief Valve
Air Release Valve
Manhole
SSMH Brisbane
SSMH Private/Other Agency
Sewer Gravity Main
Our Agency
Sewer Force Main
SS Force Main - Brisbane
O v e r v i e w M a p
6"
6"
6"
3"
3"
8"
8"
3"
6"
8"
6"
6"
6" 6"
6"
6"
12"
12"
8"
10"
14"
15"
8"
10"
8"
14"
12"
10"
14"
15"
1 0"
6"
14"
Sierra Point
Lift Station
Lift
Station #1
P a g e 6P a g e 7
P a g e 7
³
0 250500750
1,000
Feet
Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community, Sources: Esri, TomTom, Garmin, (c) OpenStreetMap contributors, and the GIS User Community, Esri, Inc., Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community Scale = 1:5,000 March 2026
S a n i t a r y S e w e r
G I S M a p S e r i e s
B r i s b a n e - C a l i f o r n i a
1 2 3
4 5
6 7
Sewer Lift Station
Lift Station
Relief Valve
Air Release Valve
Manhole
SSMH Brisbane
SSMH Private/Other Agency
Sewer Gravity Main
Our Agency
Private
Sewer Force Main
SS Force Main - Brisbane
SS Force Main - Private
SS Force Main - Other
O v e r v i e w M a p
City of Brisbane – Sewer System Management Plan 97
APPENDIX J
Equipment Inventory List and Staff Training List
Item Quantity Comments
Gas Powered Rodding Trailer 1
Electric Eel Jetter 1
Gas Powered Eel Jetter 1
Combination Hydroflush Truck by
Vactor 1
CCTV Inspection Van 1
Ford E350: Ability to locate pipe via
Sonde
Utility Truck 2 Truck #19-#20: Ford F250
Inspection push camera 1
300' of travel with ability to locate via
Sonde
Portable Generator 1 Honda 1000 gas genset
Portable Generator 1 Honda 3000 gas genset
RKI Hazardous Gas Detector 1
3" Trash Pumps 3
2" Trash Pumps 1
Metal Detector
Heavy Weight Magnets
10 mm Plastic
Palletized sand bags
Pneumatic plugs 10", 8", 6"
Various Sewer Retrieval Tools Clam shell grabber, etc.
City of Brisbane Equipment Inventory
Name Frequency Comments
Lift Station Safety, Emergency,
and Operation classes 4/year
Sewer Maintenance Equipment
Training 2/year
SSO Response Training 1/year
In-house Safety Trainings Bi-weekly
CWEA Certification Trainings As needed
City of Brisbane Training List
City of Brisbane – Sewer System Management Plan 98
APPENDIX K
Brisbane Gravity Sewer Assets
EKI B50006.00 Page 1 of 12
Erler & Kalinowski, Inc.
March 2017
TABLE A-1
Summary of Manhole Attributes, Base Flows, and Modifications Sewer System Master Plan Update
City of Brisbane, California
Modeling Modifications
CIPs Since 2003 Future Base Flows
Sewer Base Flows
Rim Elevation Invert Elevation Original Updated Projected Manhole Tributary Original Updated Original Updated Sewer Flow Existing Existing Future I.D. Area (feet) (feet) (feet) (feet) Land Use (gpd) (gpd) (gpd) F4-17 All 89.08 89.08 71.38 71.38 Non-Residential 962 756 853 X X F5-46 Bayshore 14.80 14.80 9.90 9.90 Non-Residential 456 358 405 X X F5-47 Bayshore 13.17 13.17 8.23 8.23 Non-Residential 862 678 765 X X F5-48 Bayshore 10.90 10.90 5.90 5.90 Non-Residential 862 678 765 X X F5-49 Bayshore 10.48 10.48 4.66 4.66 Residential 1,905 2,320 2,495 X X F5-50 Bayshore 9.96 9.96 3.16 3.16 Non-Residential 595 468 528 X X F5-51 Bayshore 9.40 9.40 3.00 3.00 Non-Residential 91 72 81 X X F5-52 Bayshore 7.55 7.55 -2.85 -2.85 Non-Residential 595 468 528 X X F6-81 Bayshore 224.72 224.72 218.32 218.32 Residential 105 128 137 X X X F6-82 Bayshore 199.76 199.76 196.36 196.36 Residential 105 128 137 X X F6-83 Bayshore 185.29 185.29 180.69 180.69 Residential 345 420 452 X X F6-91 Bayshore - 261.00 - 258.25 Residential - 128 137 X X X X F6-92 Bayshore - 259.00 - 255.25 Residential - 128 137 X X X X G5-02 Bayshore 18.96 18.96 14.16 14.16 Non-Residential 862 678 765 X X G5-03 Bayshore 16.92 16.92 12.07 12.07 Non-Residential 456 358 405 X X G6-01 Bayshore 161.83 161.83 157.04 157.04 Residential 345 420 452 X X G6-02 Bayshore 270.94 270.94 264.54 264.54 Residential 345 420 452 X X G6-03 Bayshore 263.64 263.64 257.94 257.94 Residential 345 420 452 X X G6-04 Bayshore 208.13 208.13 202.67 202.67 Residential 345 420 452 X X G6-05 Bayshore 148.74 148.74 143.54 143.54 Residential 345 420 452 X X G6-06 Bayshore 148.09 148.09 140.89 140.89 Residential 345 420 452 X X G6-07 Bayshore 137.77 137.77 132.77 132.77 Residential 345 420 452 X X G6-09 Bayshore 93.21 93.21 91.00 91.00 Residential 345 420 452 X X G6-10 Bayshore 67.53 67.53 60.33 60.33 Non-Residential 862 678 765 X X G6-11 Bayshore 90.90 90.90 84.70 84.70 Non-Residential 862 678 765 X X G6-12 Bayshore 60.82 60.82 54.20 54.20 Non-Residential 862 678 765 X X G6-13 Bayshore 51.91 51.91 46.07 46.07 Non-Residential 862 678 765 X X G6-14 Bayshore 46.95 46.95 41.55 41.55 Non-Residential 862 678 765 X X G6-15 Bayshore 39.01 39.01 33.61 33.61 Non-Residential 862 678 765 X X G6-16 Bayshore 33.50 33.50 27.60 27.60 Non-Residential 862 678 765 X X G6-17 Bayshore 117.48 117.48 110.98 110.98 Residential 345 420 452 X X G6-18 Bayshore 108.76 108.76 106.06 106.06 Residential 345 420 452 X X G6-19 Bayshore 107.64 107.64 101.34 101.34 Residential 345 420 452 X X G6-20 Bayshore 98.60 98.60 87.70 87.70 Residential 345 420 452 X X G6-21 Bayshore 68.03 68.03 59.62 59.62 Non-Residential 862 678 765 X X G6-22 Bayshore 50.46 50.46 43.48 43.48 Non-Residential 862 678 765 X X G6-23 Bayshore 32.23 32.23 26.73 26.73 Non-Residential 862 678 765 X X G6-24 Bayshore 29.98 29.98 24.78 24.78 Non-Residential 862 678 765 X X G6-25 Bayshore 26.25 26.25 21.35 21.35 Non-Residential 862 678 765 X X G6-26 Bayshore 22.70 22.70 18.00 18.00 Non-Residential 862 678 765 X X Existing Base Flows
Added for New Construction or Missing in Original ModelRemovedRim Elevation UpdatedInvert Elevation UpdatedAdded Base Flow Consistent With Land UseScaled Existing Flows by 6.4% for Normal Growth Existing Manhole Attributes
Private Manhole?Manhole ReplacedManhole RehabilitatedAdded for New DevelopmentRelocatedRedistributed Base FlowScaled Existing Flows by 1.23 for Residential UseScaled Existing Demands by 0.83 for Non-Residential UseAdded Flows for Future Development
EKI B50006.00 Page 2 of 12
Erler & Kalinowski, Inc.
March 2017
TABLE A-1
Summary of Manhole Attributes, Base Flows, and Modifications Sewer System Master Plan Update
City of Brisbane, California
Modeling Modifications
CIPs Since 2003 Future Base Flows
Sewer Base Flows
Rim Elevation Invert Elevation Original Updated Projected Manhole Tributary Original Updated Original Updated Sewer Flow Existing Existing Future I.D. Area (feet) (feet) (feet) (feet) Land Use (gpd) (gpd) (gpd) Existing Base Flows
Added for New Construction or Missing in Original ModelRemovedRim Elevation UpdatedInvert Elevation UpdatedAdded Base Flow Consistent With Land UseScaled Existing Flows by 6.4% for Normal Growth Existing Manhole Attributes
Private Manhole?Manhole ReplacedManhole RehabilitatedAdded for New DevelopmentRelocatedRedistributed Base FlowScaled Existing Flows by 1.23 for Residential UseScaled Existing Demands by 0.83 for Non-Residential UseAdded Flows for Future Development G6-27 Bayshore 20.92 20.92 16.17 16.17 Non-Residential 862 678 765 X X G7-01 Bayshore 294.12 97.00 284.62 89.58 Residential 345 0 0 X X X X X X G7-15 Bayshore 61.73 61.73 55.33 55.33 Non-Residential 862 678 765 X X G7-16 Bayshore 73.97 73.97 67.57 67.57 Non-Residential 862 678 765 X X G7-17 Bayshore - 295.00 - 285.67 - - 0 0 X
G7-18 Bayshore - 296.00 - 291.83 Residential - 420 452 X X X X G7-19 Bayshore - 148.00 - 142.08 - - 0 0 X
E5-01 Central Brisbane 306.31 306.31 302.01 302.01 Residential 722 879 946 X X E5-02 Central Brisbane 236.26 236.26 231.86 231.86 Residential 722 879 946 X X E5-03 Central Brisbane 236.66 236.66 229.36 229.36 Residential 722 879 946 X X E5-04 Central Brisbane 237.08 237.08 231.48 231.48 Residential 722 879 946 X X E5-05 Central Brisbane 211.45 211.45 206.35 206.35 Residential 722 879 946 X X E5-09 Central Brisbane 205.70 205.70 199.70 199.70 Residential 722 879 946 X X E5-10 Central Brisbane 200.15 200.15 194.85 194.85 Residential 722 879 946 X X E5-11 Central Brisbane 198.39 198.39 193.19 193.19 Residential 722 879 946 X X E5-12 Central Brisbane 178.75 178.75 173.95 173.95 Residential 722 879 946 X X E6-01 Central Brisbane 365.68 365.68 360.98 360.98 Residential 722 879 946 X X E6-02 Central Brisbane 359.72 359.72 353.51 353.51 Residential 722 879 946 X X E6-03 Central Brisbane 356.61 356.61 349.61 349.61 Residential 722 879 946 X X E6-04 Central Brisbane 344.84 344.84 339.84 339.84 Residential 722 879 946 X X E6-05 Central Brisbane 314.62 314.62 309.72 309.72 Residential 722 879 946 X X E6-08 Central Brisbane 283.58 283.58 276.48 276.48 Residential 722 879 946 X X E6-09 Central Brisbane 283.05 283.05 275.65 275.55 Residential 722 879 946 X X X F5-01 Central Brisbane 159.09 159.09 155.49 155.49 Residential 722 879 946 X X F5-02 Central Brisbane 159.75 159.75 154.35 154.35 Residential 722 879 946 X X F5-03 Central Brisbane 139.03 139.03 134.93 134.93 Residential 722 879 946 X X F5-04 Central Brisbane 97.71 97.71 93.31 93.31 Residential 722 879 946 X X X F5-05 Central Brisbane 65.48 65.48 59.18 59.18 Non-Residential 745 586 661 X X F5-06 Central Brisbane 161.48 161.48 156.88 156.88 Residential 722 879 946 X X F5-07 Central Brisbane 138.60 138.60 133.70 133.70 Residential 722 879 946 X X F5-08 Central Brisbane 157.13 157.13 152.63 152.63 Residential 722 879 946 X X F5-09 Central Brisbane 141.42 141.42 136.12 136.12 Residential 722 879 946 X X F5-10 Central Brisbane 134.23 134.23 128.93 128.93 Residential 722 879 946 X X F5-11 Central Brisbane 124.88 124.88 119.08 119.08 Residential 722 879 946 X X F5-12 Central Brisbane 105.19 105.19 101.09 101.09 Residential 722 879 946 X X F5-13 Central Brisbane 88.65 88.65 84.05 84.05 Residential 722 879 946 X X F5-14 Central Brisbane 49.13 49.13 44.53 44.53 Residential 1,110 1,352 1,454 X X X F5-15 Central Brisbane 46.51 46.51 40.11 40.11 Non-Residential 745 586 661 X X F5-16 Central Brisbane 78.05 78.05 71.95 71.95 Residential 1,110 1,352 1,454 X X F5-17 Central Brisbane 29.72 29.72 26.82 26.82 Residential 1,110 1,352 1,454 X X
EKI B50006.00 Page 3 of 12
Erler & Kalinowski, Inc.
March 2017
TABLE A-1
Summary of Manhole Attributes, Base Flows, and Modifications Sewer System Master Plan Update
City of Brisbane, California
Modeling Modifications
CIPs Since 2003 Future Base Flows
Sewer Base Flows
Rim Elevation Invert Elevation Original Updated Projected Manhole Tributary Original Updated Original Updated Sewer Flow Existing Existing Future I.D. Area (feet) (feet) (feet) (feet) Land Use (gpd) (gpd) (gpd) Existing Base Flows
Added for New Construction or Missing in Original ModelRemovedRim Elevation UpdatedInvert Elevation UpdatedAdded Base Flow Consistent With Land UseScaled Existing Flows by 6.4% for Normal Growth Existing Manhole Attributes
Private Manhole?Manhole ReplacedManhole RehabilitatedAdded for New DevelopmentRelocatedRedistributed Base FlowScaled Existing Flows by 1.23 for Residential UseScaled Existing Demands by 0.83 for Non-Residential UseAdded Flows for Future Development F5-18 Central Brisbane 30.20 30.20 23.30 23.30 Non-Residential 745 586 661 X X F5-19 Central Brisbane 79.42 79.42 70.32 70.32 Residential 1,110 1,352 1,454 X X F5-20 Central Brisbane 26.05 26.05 17.25 17.25 Residential 1,110 1,352 1,454 X X F5-21 Central Brisbane 14.61 14.61 8.21 8.21 Residential 1,110 1,352 1,454 X X F5-22 Central Brisbane 12.34 12.34 4.74 4.74 Non-Residential 745 586 661 X X X F5-23 Central Brisbane 111.22 111.22 107.72 107.72 Residential 1,236 1,505 1,619 X X F5-25 Central Brisbane 112.71 112.71 107.01 107.01 Residential 1,236 1,505 1,619 X X F5-26 Central Brisbane 114.29 114.29 106.59 106.59 Residential 1,236 1,505 1,619 X X F5-27 Central Brisbane 183.25 183.25 173.85 173.85 Residential 1,236 1,505 1,619 X X F5-28 Central Brisbane 106.00 106.00 98.30 98.30 Residential 1,236 1,505 1,619 X X F5-29 Central Brisbane 58.61 58.61 55.61 55.61 Residential 1,236 1,505 1,619 X X X F5-30 Central Brisbane 48.42 48.42 44.02 44.02 Residential 1,236 1,505 1,619 X X F5-31 Central Brisbane 48.25 48.25 38.25 38.25 Residential 630 767 825 X X F5-32 Central Brisbane 46.52 46.52 43.32 43.32 Residential 722 879 946 X X F5-33 Central Brisbane 33.07 33.07 29.67 29.67 Residential 1,620 1,973 2,123 X X F5-34 Central Brisbane 30.94 30.94 21.84 21.84 Residential 630 767 825 X X F5-35 Central Brisbane 23.72 23.72 18.92 18.92 Residential 1,620 1,973 2,123 X X X F5-36 Central Brisbane 18.83 18.83 10.33 10.33 Residential 630 767 825 X X F5-37 Central Brisbane 12.13 12.13 4.33 4.33 Non-Residential 745 586 661 X X F5-38 Central Brisbane 43.54 50.10 38.04 46.60 Non-Residential 456 358 405 X X X X F5-39 Central Brisbane 37.19 37.19 32.89 32.89 Residential 1,236 1,505 1,619 X X F5-40 Central Brisbane 26.67 26.67 21.17 21.17 Non-Residential 456 358 405 X X F5-41 Central Brisbane 13.45 13.45 8.15 8.15 Residential 630 767 825 X X F5-42 Central Brisbane 18.19 18.19 13.99 13.99 Residential 630 767 825 X X F5-43 Central Brisbane 10.37 10.37 5.27 5.27 Residential 630 767 825 X X F5-44 Central Brisbane 10.76 10.76 4.76 4.76 Non-Residential 745 586 661 X X F5-45 Central Brisbane 12.14 12.14 3.74 4.14 Non-Residential 1,554 1,221 1,378 X X X F5-65 Central Brisbane 78.53 78.53 71.03 71.03 Residential 722 879 946 X X F5-66 Central Brisbane 74.70 74.70 71.10 71.10 Residential 722 879 946 X X F5-67 Central Brisbane 75.09 75.09 71.69 71.69 Residential 722 879 946 X X F5-68 Central Brisbane 75.72 75.72 72.72 72.72 Residential 722 879 946 X X F6-01 Central Brisbane 308.31 308.31 304.01 304.01 Residential 722 879 946 X X F6-02 Central Brisbane 290.66 290.66 287.16 287.16 Residential 722 879 946 X X F6-03 Central Brisbane 272.03 272.03 267.93 267.93 Residential 722 879 946 X X F6-04 Central Brisbane 260.94 254.20 256.41 248.80 Residential 722 879 946 X X X X F6-05 Central Brisbane 248.86 248.86 243.86 243.86 Residential 722 879 946 X X F6-06 Central Brisbane 247.14 247.14 241.44 241.44 Residential 722 879 946 X X F6-07 Central Brisbane 236.10 236.10 232.20 232.20 Residential 722 879 946 X X F6-08 Central Brisbane 328.67 328.67 324.97 324.97 Residential 722 879 946 X X F6-09 Central Brisbane 325.02 325.02 317.22 317.22 Residential 722 879 946 X X
EKI B50006.00 Page 4 of 12
Erler & Kalinowski, Inc.
March 2017
TABLE A-1
Summary of Manhole Attributes, Base Flows, and Modifications Sewer System Master Plan Update
City of Brisbane, California
Modeling Modifications
CIPs Since 2003 Future Base Flows
Sewer Base Flows
Rim Elevation Invert Elevation Original Updated Projected Manhole Tributary Original Updated Original Updated Sewer Flow Existing Existing Future I.D. Area (feet) (feet) (feet) (feet) Land Use (gpd) (gpd) (gpd) Existing Base Flows
Added for New Construction or Missing in Original ModelRemovedRim Elevation UpdatedInvert Elevation UpdatedAdded Base Flow Consistent With Land UseScaled Existing Flows by 6.4% for Normal Growth Existing Manhole Attributes
Private Manhole?Manhole ReplacedManhole RehabilitatedAdded for New DevelopmentRelocatedRedistributed Base FlowScaled Existing Flows by 1.23 for Residential UseScaled Existing Demands by 0.83 for Non-Residential UseAdded Flows for Future Development F6-10 Central Brisbane 309.84 309.84 304.64 304.64 Residential 722 879 946 X X F6-11 Central Brisbane 320.89 318.00 314.19 313.42 Residential 722 879 946 X X X X X F6-12 Central Brisbane 307.94 307.94 301.94 301.94 Residential 722 879 946 X X F6-13 Central Brisbane 274.46 274.46 268.59 268.59 Residential 722 879 946 X X F6-14 Central Brisbane 231.86 231.86 226.16 226.16 Residential 722 879 946 X X F6-15 Central Brisbane 277.18 278.90 271.08 274.20 Residential 722 879 946 X X X X F6-16 Central Brisbane 270.04 270.04 264.44 264.44 Residential 722 879 946 X X F6-17 Central Brisbane 229.97 229.97 224.07 224.07 Residential 722 879 946 X X F6-18 Central Brisbane 213.71 213.71 208.31 208.31 Residential 722 879 946 X X F6-19 Central Brisbane 209.95 209.95 204.45 204.45 Residential 722 879 946 X X X F6-20 Central Brisbane 204.62 204.62 199.32 199.32 Residential 722 879 946 X X F6-21 Central Brisbane 184.13 184.13 178.83 178.83 Residential 722 879 946 X X F6-22 Central Brisbane 165.39 165.39 161.39 161.39 Residential 722 879 946 X X F6-23 Central Brisbane 164.79 164.79 158.09 158.09 Residential 722 879 946 X X F6-24 Central Brisbane 147.55 147.55 141.65 141.65 Residential 722 879 946 X X F6-25 Central Brisbane 134.78 134.78 128.88 128.88 Residential 722 879 946 X X F6-26 Central Brisbane 152.94 152.94 150.74 150.74 Residential 722 879 946 X X F6-27 Central Brisbane 133.08 133.08 129.38 129.38 Residential 722 879 946 X X F6-28 Central Brisbane 126.67 126.67 123.47 123.47 Residential 722 879 946 X X F6-29 Central Brisbane 119.98 119.98 114.08 114.08 Residential 722 879 946 X X F6-30 Central Brisbane 263.46 263.46 256.16 256.16 Residential 722 879 946 X X F6-31 Central Brisbane 256.86 256.86 249.56 249.56 Residential 722 879 946 X X F6-32 Central Brisbane 181.82 181.82 178.92 178.92 Residential 722 879 946 X X F6-34 Central Brisbane 120.51 120.51 116.31 116.31 Residential 722 879 946 X X X F6-35 Central Brisbane 90.77 90.77 84.97 84.97 Non-Residential 745 586 661 X X F6-36 Central Brisbane 299.74 299.74 294.94 294.94 Residential 722 879 946 X X F6-37 Central Brisbane 264.41 264.41 259.21 259.21 Residential 722 879 946 X X F6-38 Central Brisbane 271.40 271.40 266.90 266.90 Residential 722 879 946 X X F6-39 Central Brisbane 257.37 257.37 252.97 252.97 Residential 722 879 946 X X X F6-40 Central Brisbane 246.53 246.53 242.93 242.93 Residential 722 879 946 X X F6-41 Central Brisbane 231.55 231.55 223.75 223.25 Residential 722 879 946 X X X F6-42 Central Brisbane 194.19 194.19 190.29 190.29 Residential 722 879 946 X X F6-43 Central Brisbane 188.07 188.07 184.47 184.47 Residential 722 879 946 X X F6-44 Central Brisbane 212.45 212.45 209.15 209.15 Residential 722 879 946 X X F6-45 Central Brisbane 211.75 211.75 205.85 205.85 Residential 722 879 946 X X F6-46 Central Brisbane 207.21 207.21 200.41 200.41 Residential 722 879 946 X X F6-47 Central Brisbane 194.30 194.30 190.40 190.40 Residential 722 879 946 X X F6-48 Central Brisbane 215.46 215.46 210.06 210.06 Residential 722 879 946 X X F6-49 Central Brisbane 213.79 213.79 207.99 207.99 Residential 722 879 946 X X F6-50 Central Brisbane 209.95 209.95 206.05 206.05 Residential 722 879 946 X X
EKI B50006.00 Page 5 of 12
Erler & Kalinowski, Inc.
March 2017
TABLE A-1
Summary of Manhole Attributes, Base Flows, and Modifications Sewer System Master Plan Update
City of Brisbane, California
Modeling Modifications
CIPs Since 2003 Future Base Flows
Sewer Base Flows
Rim Elevation Invert Elevation Original Updated Projected Manhole Tributary Original Updated Original Updated Sewer Flow Existing Existing Future I.D. Area (feet) (feet) (feet) (feet) Land Use (gpd) (gpd) (gpd) Existing Base Flows
Added for New Construction or Missing in Original ModelRemovedRim Elevation UpdatedInvert Elevation UpdatedAdded Base Flow Consistent With Land UseScaled Existing Flows by 6.4% for Normal Growth Existing Manhole Attributes
Private Manhole?Manhole ReplacedManhole RehabilitatedAdded for New DevelopmentRelocatedRedistributed Base FlowScaled Existing Flows by 1.23 for Residential UseScaled Existing Demands by 0.83 for Non-Residential UseAdded Flows for Future Development F6-51 Central Brisbane 186.59 186.59 181.29 181.29 Residential 722 879 946 X X F6-52 Central Brisbane 173.33 173.33 167.00 167.00 Residential 722 879 946 X X F6-53 Central Brisbane 163.86 163.86 156.76 156.76 Residential 722 879 946 X X F6-54 Central Brisbane 162.64 162.64 155.34 155.34 Residential 722 879 946 X X F6-55 Central Brisbane 160.55 160.55 153.15 153.15 Residential 722 879 946 X X F6-56 Central Brisbane 183.88 183.88 177.68 177.68 Residential 722 879 946 X X F6-57 Central Brisbane 173.78 173.78 169.68 169.68 Residential 722 879 946 X X F6-58 Central Brisbane 176.94 176.94 168.54 168.54 Residential 722 879 946 X X F6-59 Central Brisbane 196.99 196.99 192.29 192.29 Residential 1,236 1,505 1,619 X X F6-60 Central Brisbane 167.86 167.86 163.86 163.86 Residential 630 767 825 X X F6-61 Central Brisbane 155.64 155.64 147.64 147.64 Residential 722 879 946 X X F6-62 Central Brisbane 131.48 131.48 124.48 124.48 Residential 722 879 946 X X F6-64 Central Brisbane 121.23 121.23 115.13 115.13 Residential 722 879 946 X X F6-65 Central Brisbane 116.07 116.07 109.97 109.97 Residential 722 879 946 X X F6-66 Central Brisbane 123.13 123.13 118.03 118.03 Residential 1,236 1,505 1,619 X X F6-67 Central Brisbane 114.98 114.98 109.98 109.98 Residential 1,236 1,505 1,619 X X X F6-68 Central Brisbane 108.72 108.72 102.62 102.62 Residential 630 767 825 X X F6-69 Central Brisbane 117.36 117.36 112.46 112.46 Residential 722 879 946 X X X F6-70 Central Brisbane 94.23 94.23 90.43 90.43 Residential 722 879 946 X X F6-71 Central Brisbane 91.87 91.87 83.67 83.67 Residential 630 767 825 X X X F6-72 Central Brisbane 69.82 69.82 61.12 61.12 Residential 630 767 825 X X X F6-73 Central Brisbane 194.62 194.62 191.12 191.12 Residential 1,236 1,505 1,619 X X X F6-74 Central Brisbane 85.79 85.79 82.29 82.29 Residential 1,236 1,505 1,619 X X X F6-75 Central Brisbane 80.81 80.81 76.11 76.11 Residential 722 879 946 X X X F6-76 Central Brisbane 61.12 61.12 56.42 56.42 Residential 722 879 946 X X F6-77 Central Brisbane 61.71 61.71 52.41 52.41 Residential 722 879 946 X X X F6-78 Central Brisbane 62.92 62.92 57.72 57.72 Residential 722 879 946 X X F6-79 Central Brisbane 46.40 46.40 40.00 40.00 Residential 722 879 946 X X F6-84 Central Brisbane 208.20 208.20 204.90 204.90 Residential 722 879 946 X X F6-85 Central Brisbane 230.19 230.19 226.99 226.99 Residential 722 879 946 X X F6-86 Central Brisbane 336.84 341.00 333.54 337.33 Residential 722 879 946 X X X X X F6-87 Central Brisbane 115.72 115.72 110.12 110.12 Residential 630 767 825 X X F6-88 Central Brisbane - 347.00 - 343.42 Residential - 879 946 X X X X F6-89 Central Brisbane - 338.00 - 333.17 Residential - 879 946 X X X X F6-90 Central Brisbane - 326.00 - 319.25 Residential - 879 946 X X X X F6-93 Central Brisbane - 297.00 - 294.58 Residential - 879 946 X X X X D3-01 Crocker Park / Northeast Ridge 315.53 295.54 307.93 290.40 Residential 375 457 491 X X X X X D3-02 Crocker Park / Northeast Ridge 310.16 293.55 302.56 289.40 Residential 375 457 491 X X X X X D3-03 Crocker Park / Northeast Ridge 305.84 292.59 298.24 288.40 Residential 375 457 491 X X X X X D3-04 Crocker Park / Northeast Ridge 300.50 291.42 292.90 287.20 Residential 375 457 491 X X X X X
EKI B50006.00 Page 6 of 12
Erler & Kalinowski, Inc.
March 2017
TABLE A-1
Summary of Manhole Attributes, Base Flows, and Modifications Sewer System Master Plan Update
City of Brisbane, California
Modeling Modifications
CIPs Since 2003 Future Base Flows
Sewer Base Flows
Rim Elevation Invert Elevation Original Updated Projected Manhole Tributary Original Updated Original Updated Sewer Flow Existing Existing Future I.D. Area (feet) (feet) (feet) (feet) Land Use (gpd) (gpd) (gpd) Existing Base Flows
Added for New Construction or Missing in Original ModelRemovedRim Elevation UpdatedInvert Elevation UpdatedAdded Base Flow Consistent With Land UseScaled Existing Flows by 6.4% for Normal Growth Existing Manhole Attributes
Private Manhole?Manhole ReplacedManhole RehabilitatedAdded for New DevelopmentRelocatedRedistributed Base FlowScaled Existing Flows by 1.23 for Residential UseScaled Existing Demands by 0.83 for Non-Residential UseAdded Flows for Future Development D3-05 Crocker Park / Northeast Ridge 294.71 290.21 287.11 285.80 Residential 375 457 491 X X X X X D3-06 Crocker Park / Northeast Ridge 292.55 289.70 284.95 284.00 Residential 375 457 491 X X X X X D3-07 Crocker Park / Northeast Ridge 290.15 290.15 282.55 282.55 Residential 375 457 491 X X D3-08 Crocker Park / Northeast Ridge 277.89 277.89 270.69 270.69 Residential 375 457 491 X X D3-09 Crocker Park / Northeast Ridge 261.92 261.92 254.62 254.62 Residential 375 457 491 X X D3-10 Crocker Park / Northeast Ridge 251.70 251.70 246.40 246.40 Residential 375 457 491 X X D3-11 Crocker Park / Northeast Ridge 255.60 272.30 249.80 266.20 Residential 375 457 491 X X X X X D3-12 Crocker Park / Northeast Ridge 253.59 261.08 247.79 256.70 Residential 375 457 491 X X X X X D3-13 Crocker Park / Northeast Ridge 249.39 248.04 243.59 243.50 Residential 375 457 491 X X X X X D3-14 Crocker Park / Northeast Ridge 248.07 248.07 242.27 242.27 Residential 375 457 491 X X D3-15 Crocker Park / Northeast Ridge 252.59 253.89 245.19 248.00 Residential 375 457 491 X X X X X D3-16 Crocker Park / Northeast Ridge 245.30 249.61 237.90 244.00 Residential 375 457 491 X X X X X D3-17 Crocker Park / Northeast Ridge 238.01 235.86 230.61 230.70 Residential 375 457 491 X X X X X D3-18 Crocker Park / Northeast Ridge 235.73 235.73 228.33 228.33 Residential 375 457 491 X X D3-19 Crocker Park / Northeast Ridge 217.03 217.03 209.73 209.73 Residential 375 457 491 X X D3-20 Crocker Park / Northeast Ridge 199.87 199.87 192.97 192.97 Residential 375 457 491 X X D3-21 Crocker Park / Northeast Ridge 187.79 187.79 180.69 180.69 Residential 375 457 491 X X D3-22 Crocker Park / Northeast Ridge X 235.02 235.02 229.62 229.62 Residential 375 457 491 X X D3-23 Crocker Park / Northeast Ridge X 234.11 234.11 227.71 227.71 Residential 375 457 491 X X D3-24 Crocker Park / Northeast Ridge X 231.62 231.62 224.42 224.42 Residential 375 457 491 X X D3-25 Crocker Park / Northeast Ridge X 226.42 226.42 222.12 222.12 Residential 375 457 491 X X D3-26 Crocker Park / Northeast Ridge X 224.46 224.46 216.36 216.36 Residential 375 457 491 X X D3-27 Crocker Park / Northeast Ridge X 219.26 219.26 213.06 213.06 Residential 375 457 491 X X D3-28 Crocker Park / Northeast Ridge X 218.25 218.25 211.95 211.95 Residential 375 457 491 X X D3-29 Crocker Park / Northeast Ridge X 212.63 212.63 205.33 205.33 Residential 375 457 491 X X D3-30 Crocker Park / Northeast Ridge X 198.73 198.73 190.83 190.83 Residential 375 457 491 X X D3-31 Crocker Park / Northeast Ridge 195.94 195.94 187.84 187.84 Residential 375 457 491 X X D3-32 Crocker Park / Northeast Ridge 193.94 193.94 185.74 185.74 Residential 375 457 491 X X D3-33 Crocker Park / Northeast Ridge 190.00 190.00 184.50 184.50 Residential 375 457 491 X X D3-34 Crocker Park / Northeast Ridge 187.72 187.72 182.12 182.12 Residential 375 457 491 X X D3-35 Crocker Park / Northeast Ridge 184.93 184.93 178.23 178.23 Residential 375 457 491 X X D3-36 Crocker Park / Northeast Ridge 181.02 181.02 174.52 174.52 Residential 375 457 491 X X D3-37 Crocker Park / Northeast Ridge 172.87 172.87 168.77 168.77 Residential 375 457 491 X X D3-38 Crocker Park / Northeast Ridge 173.07 173.07 167.57 167.57 Residential 375 457 491 X X D3-39 Crocker Park / Northeast Ridge 158.57 158.57 153.27 153.27 Residential 375 457 491 X X D3-40 Crocker Park / Northeast Ridge 155.08 155.08 148.78 148.78 Residential 375 457 491 X X D3-41 Crocker Park / Northeast Ridge 215.42 215.42 208.42 208.42 Non-Residential 962 756 853 X X D3-42 Crocker Park / Northeast Ridge 161.54 161.54 154.24 154.24 - 0 0 0 D3-43 Crocker Park / Northeast Ridge 155.69 155.69 148.39 148.39 Residential 375 457 491 X X D3-44 Crocker Park / Northeast Ridge 143.54 143.54 136.94 136.94 Residential 375 457 491 X X
EKI B50006.00 Page 7 of 12
Erler & Kalinowski, Inc.
March 2017
TABLE A-1
Summary of Manhole Attributes, Base Flows, and Modifications Sewer System Master Plan Update
City of Brisbane, California
Modeling Modifications
CIPs Since 2003 Future Base Flows
Sewer Base Flows
Rim Elevation Invert Elevation Original Updated Projected Manhole Tributary Original Updated Original Updated Sewer Flow Existing Existing Future I.D. Area (feet) (feet) (feet) (feet) Land Use (gpd) (gpd) (gpd) Existing Base Flows
Added for New Construction or Missing in Original ModelRemovedRim Elevation UpdatedInvert Elevation UpdatedAdded Base Flow Consistent With Land UseScaled Existing Flows by 6.4% for Normal Growth Existing Manhole Attributes
Private Manhole?Manhole ReplacedManhole RehabilitatedAdded for New DevelopmentRelocatedRedistributed Base FlowScaled Existing Flows by 1.23 for Residential UseScaled Existing Demands by 0.83 for Non-Residential UseAdded Flows for Future Development D3-45 Crocker Park / Northeast Ridge X 216.63 216.63 209.73 209.73 Residential 375 457 491 X X D3-46 Crocker Park / Northeast Ridge X 214.22 214.22 203.72 203.72 Residential 375 457 491 X X D3-47 Crocker Park / Northeast Ridge X 203.39 203.39 198.69 198.69 Residential 375 457 491 X X D3-48 Crocker Park / Northeast Ridge X 203.75 203.75 197.25 197.25 Residential 375 457 491 X X D3-49 Crocker Park / Northeast Ridge X 200.29 200.29 185.09 185.09 Residential 375 457 491 X X D3-50 Crocker Park / Northeast Ridge - 581.50 - 274.60 - - 0 0 X D3-51 Crocker Park / Northeast Ridge - 289.36 - 277.90 - - 0 0 X D3-52 Crocker Park / Northeast Ridge - 291.90 - 279.71 Residential - 393 423 X X X X D3-53 Crocker Park / Northeast Ridge - 296.10 - 286.09 Residential - 393 423 X X X X D3-54 Crocker Park / Northeast Ridge - 304.80 - 294.92 Residential - 393 423 X X X X D3-55 Crocker Park / Northeast Ridge - 308.50 - 298.72 Residential - 393 423 X X X X D3-56 Crocker Park / Northeast Ridge - 314.80 - 304.51 Residential - 393 423 X X X X D3-57 Crocker Park / Northeast Ridge - 321.70 - 311.93 Residential - 393 423 X X X X D3-58 Crocker Park / Northeast Ridge - 327.40 - 317.94 Residential - 393 423 X X X X D3-59 Crocker Park / Northeast Ridge - 332.60 - 322.40 Residential - 393 423 X X X X D3-60 Crocker Park / Northeast Ridge - 343.60 - 336.78 Residential - 393 423 X X X X D3-61 Crocker Park / Northeast Ridge - 344.50 - 337.79 Residential - 393 423 X X X X D3-62 Crocker Park / Northeast Ridge - 374.80 - 364.15 Residential - 393 423 X X X X D3-63 Crocker Park / Northeast Ridge - 371.20 - 360.44 Residential - 393 423 X X X X D3-64 Crocker Park / Northeast Ridge - 370.40 - 359.40 Residential - 393 423 X X X X D3-65 Crocker Park / Northeast Ridge - 382.40 - 370.32 Residential - 393 423 X X X X D3-66 Crocker Park / Northeast Ridge - 390.90 - 381.60 Residential - 393 423 X X X X D3-67 Crocker Park / Northeast Ridge - 394.10 - 384.28 Residential - 393 423 X X X X D3-68 Crocker Park / Northeast Ridge - 364.00 - 333.50 Residential - 393 423 X X X X D3-69 Crocker Park / Northeast Ridge - 334.70 - 324.52 Residential - 393 423 X X X X D3-70 Crocker Park / Northeast Ridge - 330.40 - 319.57 - - 0 0 X D3-71 Crocker Park / Northeast Ridge - 352.80 - 346.32 Residential - 393 423 X X X X D3-72 Crocker Park / Northeast Ridge - 351.00 - 344.27 Residential - 393 423 X X X X D3-73 Crocker Park / Northeast Ridge - 348.10 - 337.64 Residential - 393 423 X X X X D3-74 Crocker Park / Northeast Ridge - 333.16 - 323.05 Residential - 393 423 X X X X D3-75 Crocker Park / Northeast Ridge - 329.81 - 320.11 Residential - 393 423 X X X X D3-76 Crocker Park / Northeast Ridge - 309.55 - 299.85 - - 0 0 X D3-77 Crocker Park / Northeast Ridge - 294.93 - 291.30 - - 0 0 X D4-01 Crocker Park / Northeast Ridge 140.74 140.74 133.74 133.74 Non-Residential 962 756 853 X X D4-02 Crocker Park / Northeast Ridge 131.39 131.39 124.39 124.39 Non-Residential 962 756 853 X X D4-03 Crocker Park / Northeast Ridge 129.02 129.02 122.92 122.92 Non-Residential 962 756 853 X X D4-04 Crocker Park / Northeast Ridge 206.85 206.85 199.85 199.85 Non-Residential 962 756 853 X X D4-05 Crocker Park / Northeast Ridge 194.59 194.59 186.49 186.49 Non-Residential 962 756 853 X X D4-06 Crocker Park / Northeast Ridge 185.25 185.25 178.55 178.55 Non-Residential 962 756 853 X X D4-07 Crocker Park / Northeast Ridge 178.84 178.84 172.24 172.24 Non-Residential 962 756 853 X X
EKI B50006.00 Page 8 of 12
Erler & Kalinowski, Inc.
March 2017
TABLE A-1
Summary of Manhole Attributes, Base Flows, and Modifications Sewer System Master Plan Update
City of Brisbane, California
Modeling Modifications
CIPs Since 2003 Future Base Flows
Sewer Base Flows
Rim Elevation Invert Elevation Original Updated Projected Manhole Tributary Original Updated Original Updated Sewer Flow Existing Existing Future I.D. Area (feet) (feet) (feet) (feet) Land Use (gpd) (gpd) (gpd) Existing Base Flows
Added for New Construction or Missing in Original ModelRemovedRim Elevation UpdatedInvert Elevation UpdatedAdded Base Flow Consistent With Land UseScaled Existing Flows by 6.4% for Normal Growth Existing Manhole Attributes
Private Manhole?Manhole ReplacedManhole RehabilitatedAdded for New DevelopmentRelocatedRedistributed Base FlowScaled Existing Flows by 1.23 for Residential UseScaled Existing Demands by 0.83 for Non-Residential UseAdded Flows for Future Development D4-08 Crocker Park / Northeast Ridge 133.08 133.08 127.18 127.18 Non-Residential 962 756 853 X X D4-09 Crocker Park / Northeast Ridge 128.51 128.51 121.40 121.40 Non-Residential 962 756 853 X X D4-10 Crocker Park / Northeast Ridge 123.17 123.17 114.77 114.77 Non-Residential 962 756 853 X X D4-11 Crocker Park / Northeast Ridge 109.31 109.31 100.91 100.91 Non-Residential 962 756 853 X X D4-12 Crocker Park / Northeast Ridge X 175.82 175.82 170.82 170.82 Residential 375 457 491 X X D4-13 Crocker Park / Northeast Ridge X 123.00 123.00 111.00 111.00 - 0 0 0 D4-14 Crocker Park / Northeast Ridge 119.21 119.21 109.31 109.31 Non-Residential 962 756 853 X X D4-15 Crocker Park / Northeast Ridge 111.24 111.24 100.84 100.84 Non-Residential 962 756 853 X X D4-16 Crocker Park / Northeast Ridge X 114.53 114.53 104.23 104.23 - 0 0 0 E3-17 Crocker Park / Northeast Ridge 258.80 258.80 251.80 251.80 Residential 375 457 491 X X E3-18 Crocker Park / Northeast Ridge 258.06 258.06 249.36 249.36 Residential 375 457 491 X X E3-19 Crocker Park / Northeast Ridge 254.26 254.26 247.56 247.56 Residential 375 457 491 X X E3-20 Crocker Park / Northeast Ridge 251.80 251.80 244.20 244.20 Residential 375 457 491 X X X E3-21 Crocker Park / Northeast Ridge 290.36 290.36 285.36 285.36 Residential 375 457 491 X X E3-22 Crocker Park / Northeast Ridge - 380.40 - 373.31 Residential - 393 423 X X X X E3-23 Crocker Park / Northeast Ridge - 377.50 - 370.77 Residential - 393 423 X X X X E4-01 Crocker Park / Northeast Ridge 126.64 126.64 119.04 119.04 Non-Residential 962 756 853 X X E4-02 Crocker Park / Northeast Ridge 123.32 123.32 115.82 115.82 Non-Residential 962 756 853 X X E4-03 Crocker Park / Northeast Ridge 111.51 111.51 104.41 104.41 Non-Residential 962 756 853 X X E4-04 Crocker Park / Northeast Ridge 98.46 98.46 90.06 90.06 Non-Residential 962 756 853 X X E4-06 Crocker Park / Northeast Ridge 82.52 82.52 74.12 74.12 Non-Residential 962 756 853 X X E4-08 Crocker Park / Northeast Ridge 60.92 60.92 52.42 52.42 Non-Residential 962 756 853 X X E4-09 Crocker Park / Northeast Ridge 53.20 53.20 45.09 45.09 Non-Residential 962 756 853 X X E4-11 Crocker Park / Northeast Ridge 48.92 48.92 42.62 42.62 Non-Residential 962 756 853 X X E4-12 Crocker Park / Northeast Ridge 49.02 49.02 41.12 41.12 Non-Residential 962 756 853 X X E4-14 Crocker Park / Northeast Ridge X 196.48 196.48 186.48 186.48 Residential 375 457 491 X X E4-16 Crocker Park / Northeast Ridge 107.98 107.98 98.08 98.08 Non-Residential 962 756 853 X X E4-17 Crocker Park / Northeast Ridge X 160.31 160.31 151.91 151.91 Residential 375 457 491 X X E4-18 Crocker Park / Northeast Ridge X 102.14 102.14 91.24 91.24 - 0 0 0 E4-19 Crocker Park / Northeast Ridge 98.72 98.72 90.92 90.92 Non-Residential 962 756 853 X X E4-20 Crocker Park / Northeast Ridge 94.48 94.48 85.08 85.08 - 0 0 0 E4-21 Crocker Park / Northeast Ridge 146.84 146.84 134.24 134.24 Residential 375 457 491 X X E4-22 Crocker Park / Northeast Ridge 89.29 89.29 78.59 78.59 - 0 0 0 E4-23 Crocker Park / Northeast Ridge 83.34 83.34 76.14 76.14 - 0 0 0 E4-24 Crocker Park / Northeast Ridge 79.73 79.73 72.53 72.53 - 0 0 0 E4-26 Crocker Park / Northeast Ridge 71.37 71.37 66.37 66.37 Non-Residential 962 756 853 X X E4-27 Crocker Park / Northeast Ridge 60.61 60.61 55.81 55.81 Non-Residential 962 756 853 X X E4-28 Crocker Park / Northeast Ridge 55.74 55.74 50.54 50.54 Non-Residential 962 756 853 X X E4-30 Crocker Park / Northeast Ridge 266.44 266.44 261.94 261.94 Residential 375 457 491 X X E4-31 Crocker Park / Northeast Ridge 265.14 265.14 260.54 260.54 Residential 375 457 491 X X