Attachment 3
Resolution PC-01-26
101 freeway.” To implement this policy, General Plan Program C.1.b calls for development of plans for Bayshore Boulevard “that address the effects of regional through traffic within Brisbane and enhances mobility for Brisbane residents and businesses through a combination of roadway and intersection, transit, bicycle, and pedestrian facility improvements that would not cause a substantial increase in vehicle miles traveled (VMT) on Bayshore Boulevard or other routes through the City;” and
WHEREAS, the Bayshore Mobility Plan builds on the 2022 Brisbane Bayshore Complete Streets Safety Assessment prepared by the Safe Transportation Research and Education Center (SafeTREC) at University of California, Berkeley in collaboration with Fehr & Peers and City staff, which was presented to the City Council on October 19, 2023 and presented to the Complete Streets Safety Committee of the City of Brisbane on February 7, 2024; and WHEREAS, the Bayshore Mobility Plan expands upon the 2022 Brisbane Bayshore Complete Streets Safety Assessment’s recommendations north from Old County Road to Geneva Avenue to enhance mobility for Brisbane residents by enhancing connectivity for residents and land uses abutting Bayshore Boulevard, reducing the prominence of regional through traffic along Bayshore Boulevard, redesigning Bayshore Boulevard as a multi-modal corridor, increasing connectivity between the Baylands and the existing City of Brisbane, and improving the look of the corridor; and
WHEREAS, from Geneva Avenue south to San Bruno Avenue, the Bayshore Mobility Plan would reduce the number of travel lanes from four (two in each direction) to two (one in each direction), reduce the posted speed limit from 45 miles per hour (mph) to 35 mph, widen sidewalks and add a multi-use Class I path on the west side of the corridor, provide protected intersections at locations with vulnerable roadway users (such as school children at Bayshore and Main Street traveling to the proposed middle school within the Baylands), and improve access control to local streets within the Baylands; and
WHEREAS, on May 14, 2026, the Brisbane Baylands Specific Plan Final Environmental Impact Report (State Clearinghouse Number #2006022136) was published and made available on the City’s website; and
WHEREAS, on May 28, 2026, and June 11, 2026, the Planning Commission conducted public workshops to provide an overview of the Final EIR, the Baylands Specific Plan, and the Bayshore Mobility Plan; and
WHEREAS, on June 25, 2026, June 30, 2026, and July 23, 2026, the Planning Commission conducted a duly noticed public hearing on the Final EIR, Baylands Specific Plan, and Bayshore Mobility Plan, at which time any person interested in the matter was given the opportunity to be heard; and
WHEREAS, on July 23, 2026, following close of the public hearing, the Planning Commission deliberated on the Bayshore Mobility Plan and considered public testimony and Commission discussion regarding the topic; and
Attachment 3
Resolution PC-01-26
WHEREAS, notice of the Planning Commission public hearing was posted and mailed to property owners of the subject properties and within 300 feet of the boundaries of the subject properties and all interested parties requesting notice, per Brisbane Municipal Code Section
17.54.020 prior to the Planning Commission hearings; and WHEREAS, the Bayshore Mobility Plan is consistent with the Brisbane General Plan, as analyzed under Impact TRA-2: Facilitate Transit, Bicycle, and Pedestrian Travel Modes, in Final EIR Section 4-8 Transportation. NOW, THEREFORE, based on the findings set forth herein, the Planning Commission of the City of Brisbane, at its meeting of July 23, 2026, resolves as follows:
Section 1.
A. The above recitals are true and correct and are incorporated herein by reference as if set forth in full.
B. The Planning Commission of the City of Brisbane recommends the following action be taken by the City Council of the City of Brisbane:
1. Adopt the Bayshore Mobility Plan, provided in Appendix F to the Final Environmental Impact Report for the Brisbane Baylands Specific Plan published May 2026, incorporated by reference as Exhibit A, in accordance with Government Code section 65359, subject to the following modifications:
a. Implementation of the Bayshore Mobility Plan shall be limited to those improvements that mitigate impacts associated with the Baylands Specific Plan project as presented in the project EIR; and
b. The elements of the Bayshore Mobility Plan that would reduce the number of travel lanes on Bayshore Boulevard from four lanes (two in each direction) to two lanes (one in each direction) between Geneva Avenue and San Bruno Avenue shall not be adopted.
2. Direct staff to further study the feasibility of a continuous Class I multi-use path or comparable sidewalk improvement along the portion of Bayshore Boulevard outside the Baylands Specific Plan boundary, and to return to the City Council with the results of that study.
ADOPTED this 23rd day of July 2026, by the following vote:
AYES: GOODING, LAU, SAYASANE, WODZIAK
NOES: FUNKE
ABSENT: None
DOUGLAS GOODING, Chair
ATTACHMENT 11
Attachment 3
Resolution PC-01-26
ATTEST: ________________________________________________ JULIA AYRES, Community Development Director ATTACHMENT 11
Attachment 3
Resolution PC-01-26
EXHIBIT A
Bayshore Mobility Plan
Incorporated by reference
Available online at: https://www.brisbaneca.gov/787/Major-Documents
Attachment 3
Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 12.a
Attachment 12.a: Redline copies of General Plan and Zoning Ordinance Amendments (Map Amendments)
i. GP Circulation Element - Proposed Figure C-3 (Draft) https://www.brisbaneca.gov/DocumentCenter/View/3037/GP-Circulation-Element---Proposed-Figure-C-3-Draft ii. GP Circulation Element - Proposed Figure C-4 (Draft) https://www.brisbaneca.gov/DocumentCenter/View/3036/GP-Circulation-Element---Proposed-Figure-C-4-Draft iii. GP Land Use Map - Proposed Baylands Specific Plan Land Use (Draft) https://www.brisbaneca.gov/DocumentCenter/View/3039/GP-Land-Use-Map---Proposed-Baylands-Specific-Plan-Land-Use-Draft iv. Zoning Map - Proposed Baylands Specific Plan Zoning District (Draft) https://www.brisbaneca.gov/DocumentCenter/View/3038/Zoning-Map---Proposed-Baylands-Specific-Plan-Zoning-District-Draft 1
Attachment 3
Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 12.b
Attachment 12.b: Redline copies of General Plan and Zoning Ordinance Amendments (Text Amendments)
i. BMC Title 17 Zoning - Redline
https://www.brisbaneca.gov/DocumentCenter/View/3043/BMC-Title-17-Zoning---Redline ii. General Plan Chapter 5 Land Use - Redline
https://www.brisbaneca.gov/DocumentCenter/View/3040/GP-Chapter-5-Land-Use---Redline iii. General Plan Chapter 6 Circulation - Redline
https://www.brisbaneca.gov/DocumentCenter/View/3041/GP-Chapter-6-Circulation---Redline 1
Attachment 3
Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 13
Attachment 13: Additional Net-Zero/Carbon-Neutral Project Comparison Materials Additional net-zero/carbon-neutral project comparison materials (referenced in July 23, 2026 memorandum, Attachment 4)
https://brisbaneca.portal.civicclerk.com/event/6872/files/attachment/2331 1
Attachment 3
BRISBANE PLANNING COMMISSION
Action Minutes of May 28, 2026
Hybrid Meeting
CALL TO ORDER
Chairperson Gooding called the meeting to order at 7:34 p.m.
ROLL CALL
Present: Commissioners Gooding, Lau, and Wodziak
Absent: Commissioners Funke and Sayasane
Staff Present: Community Development Director Ayres, Director of Public Works/City Engineer Bozorginia, City Attorney Phillips, Senior Planner Robbins, and Associate Planner Whitney
ADOPTION OF AGENDA
A motion was made by Commissioner Wodziak and seconded by Commissioner Lau to adopt the agenda. Motion approved 3-0.
CONSENT CALENDAR
A. Approval of draft meeting minutes of May 14, 2026
A motion was made by Commissioner Wodziak and seconded by Commissioner Lau to adopt the consent calendar. Motion approved 3-0.
ORAL COMMUNICATIONS
There were none.
WRITTEN COMMUNICATIONS
There were none.
OLD BUSINESS
There were none.
NEW BUSINESS
There were none.
WORKSHOP
B. Baylands Specific Plan
Director Ayres reviewed the workshop objectives and introduced the City's team, including consultants, who are responsible for the review of the Baylands Specific Plan and related materials, defined key terminology, and provided a brief project history.
The in-person consultant team consisted of: Woody Hanson of SiteLab, Jeff Caton of ESA, Matt Brennan of ESA, Matt Goyne of Fehr & Peers, Ashutosh Singhal of SiteLab, and Terri Avila of
Attachment 3
Brisbane Planning Commission Minutes
May 28, 2026
ESA. The remote consultant team included Bev Choi of ESA and other ESA team members available as needed for questions.
The presentation was organized into four segments comparing the 2025 developer-submitted Specific Plan to the 2026 staff-recommended Specific Plan, chapter by chapter, covering background and Measure JJ program parameters (1,800–2,200 residential units and up to 7 million square feet of commercial development); land use, density, and building/tower standards (Chapters 1–3); sustainability, open space, sea-level rise, and circulation, including proposed changes to the Geneva Avenue bridge and the Bayshore Boulevard road diet (Chapters 4–6); and infrastructure, financing, and implementation and phasing (Chapters 7–9), concluding with next steps including the EIR workshop on June 11 and the first public hearing on June 25. The consultant team answered Commission questions on topics including items outside the Commission's review, such as the Cal Water agreement; density and floor area ratio flexibility; tower allotments, heights, and story counts; sea-level rise projections and methodology, including differences from the 2025 plan's projections; the Geneva Avenue and Bayshore Boulevard circulation changes; green shared streets; and parking allocations, particularly in the Ice House Hill district.
Staff answered questions from the Commission regarding the staff-recommended minimum average floor area ratio for commercial development, maximum number of dwelling units in relation to the building height, commercial on ground floors in relation to the Caltrain station, and project phasing and related remediation.
Chair Gooding opened up the workshop to public comment.
Nancy Lacsamana — Opposed narrowing Bayshore Boulevard and the amount of commercial parking proposed; requested a gym for younger residents.
Darren Clark, Carpenters Local 217 — Supported the project for its economic benefits and commitment to area-standard wages, apprenticeships, and healthcare for trades workers.
Cynthia Gomez, Unite Here Local 2 — Opposed the project as proposed, citing a jobs-housing imbalance, site toxicity, and greenhouse gas emissions; urged reduced commercial development and increased affordable housing.
Clara Johnson — Raised concerns about site toxicity, groundwater rise, and the size of the commercial component; requested closed captioning and additional public outreach.
Janice Au-Yeung — Requested advance copies of presentation slides for future meetings and asked why the Water Supply Agreement is outside the Commission's purview.
Michele Salmon (remote) — Opposed narrowing Bayshore Boulevard, echoed Clara Johnson's concerns, and asked that the EIR and Specific Plan be aligned.
ITEMS INITIATED BY STAFF
There were none.
Attachment 3
Brisbane Planning Commission Minutes
May 28, 2026
ITEMS INITIATED BY THE COMMISSION
There were none.
ADJOURNMENT
C. Chairperson Gooding adjourned to the next regular meeting of June 11, 2026, with an early starting time of 6:30 p.m., at approximately 9:53 p.m.
Attest:
_______________________________________
Julia Ayres, Community Development Director
NOTE: A full video record of this meeting can be found on the City’s YouTube channel at www.youtube.com/BrisbaneCA, on the City’s website at http://www.brisbaneca.org/meetings, or on DVD (by request only) at City Hall.
Attachment 3
BRISBANE PLANNING COMMISSION
Action Minutes of June 11, 2026
Hybrid Meeting
CALL TO ORDER
Chairperson Gooding called the meeting to order at 6:33 p.m.
ROLL CALL
Present: Commissioners Gooding, Lau, and Sayasane
Absent: Commissioners Funke and Wodziak
Staff Present: Community Development Director Ayres, Director of Public Works/City Engineer Bozorginia, Senior Planner Robbins, and Associate Planner Whitney
ADOPTION OF AGENDA
A motion was made by Commissioner Sayasane and seconded by Commissioner Lau to adopt the agenda. Motion approved 3-0.
CONSENT CALENDAR
There were none.
ORAL COMMUNICATIONS
There were none.
WRITTEN COMMUNICATIONS
A joint letter was received from the Sierra Club Bay Alive Loma Prieta Chapter, the San Francisco Bay Citizens Committee to Complete the Refuge, Green Foothills, and the San Mateo County Bird Alliance regarding the Baylands Specific Plan Project Final Environmental Impact Report.
OLD BUSINESS
There were none.
NEW BUSINESS
There were none.
WORKSHOP
A. Baylands Specific Plan; Environmental Review and Public Hearing Process Director Ayres reviewed the workshop objectives and introduced the City's team, including the consultants responsible for the review of the Baylands Specific Plan and related materials, defined key terminology, and provided a brief project history, including an outline of what has changed between the developer's 2025 submittal and the 2026 staff-recommended version of the plan, a guide on how to read and understand the plan, and next steps following the workshop.
Attachment 3
Brisbane Planning Commission Minutes
June 11, 2026
The in-person consultant team consisted of: Terri Avila of ESA, Brian Schuster of ESA, Todd Gordon of ESA, Michael Burns of ESA, Matt Goyne of Fehr & Peers, Brian Boxer of ESA, and City Attorney Eric Phillips. The remote consultant team consisted of Susan Yogi of ESA, Kathy Cleveland of ESA, Ashleigh Sims of ESA, Brian Pattman of ESA, Matt Brennan of ESA, Erik Calloway of ESA, Jeff Caton of ESA, Bev Choi of ESA, Woody Hanson of SiteLab, and Ashutosh Singhal of SiteLab.
The consultant team answered Commission questions on the timeline from the Planning Commission to the City Council and related deadlines; continued monitoring of landfill caps and which entity would be responsible; the timing of the solar field's installation later in development and its self-sufficiency; the Sierra Club's comment on the potential hazard of the Schlage groundwater plume; and the risk to Brisbane's water supply if Cal Water is affected by the Bay Delta Plan. The Commission also raised concerns regarding potential increased traffic and accidents from the proposed Bayshore Boulevard lane reduction, and the concept of shared streets among vehicles, e-bikes, e-scooters, pedestrians, and people with mobility issues, including additional traffic signals and speed cameras along Bayshore Boulevard.
Staff answered Commission questions regarding Brisbane's water supply versus Cal Water's supply to the Baylands, and how changes to the Development Agreement would affect the Specific Plan.
Chair Gooding opened public comment.
Clara Johnson — Opposed the Bayshore Boulevard lane reduction as a safety and emergency-evacuation risk and raised concerns about incomplete chemical and health-risk monitoring information.
Unidentified speaker — Raised concerns about sewer infrastructure capacity, the need for ongoing vapor monitoring in residential and commercial units, overnight construction noise, anticipated commute-time increases, and reliability of the power grid substation.
Frank Cohen — Opposed the reduction in required public art funding under the Specific Plan compared to the City's standard requirement.
Cynthia Gomez, Unite Here Local 2 — Opposed the project as proposed, citing a substantial jobs-housing/below-market-rate housing shortfall and the removal of greenhouse gas mitigation measures and the energy-neutrality commitment from the Final EIR.
Unidentified speaker — Agreed with Commissioner Sayasane's concerns over the road diet on Bayshore Boulevard, citing similar outcomes from lane reductions in San Francisco.
Michele Salmon (remote) — Opposed taking action on project entitlements before adequate study and the Bayshore Mobility Plan’s road diet.
Commissioner Lau asked staff what is the process if construction activities breached the landfill cap, and when and for how long will testing occur.
Attachment 3
Brisbane Planning Commission Minutes
June 11, 2026
Director Ayres confirmed that staff's recommended Specific Plan retains the City's public art funding requirement as it applies under the ordinance today, rather than the reduced requirement proposed in the 2025 version of the plan.
Chairperson Gooding announced he would be unable to attend the regularly scheduled meeting on June 25, but would be available for any special meetings that may be scheduled.
ITEMS INITIATED BY STAFF
Director Ayres announced that the June 18th City Council meeting will include a hearing on the Open Space Element that the Commission reviewed in May.
ITEMS INITIATED BY THE COMMISSION
There were none.
ADJOURNMENT
B. Chairperson Gooding adjourned to the next regular meeting of June 25, 2026, at approximately 8:55 p.m.
Attest:
_______________________________________
Julia Ayres, Community Development Director
NOTE: A full video record of this meeting can be found on the City’s YouTube channel at www.youtube.com/BrisbaneCA, on the City’s website at http://www.brisbaneca.org/meetings, or on DVD (by request only) at City Hall.
Attachment 3
BRISBANE PLANNING COMMISSION
Action Minutes of June 25, 2026
Hybrid Meeting
CALL TO ORDER
Acting Chairperson Funke called the meeting to order at 7:30 p.m.
ROLL CALL
Present: Commissioners Funke, Sayasane, and Wodziak
Absent: Commissioners Gooding and Lau
Staff Present: Community Development Director Ayres, Senior Planner Robbins, and City Attorney Phillips
ADOPTION OF AGENDA
A motion was made by Commissioner Sayasane and seconded by Commissioner Wodziak to adopt the agenda. Motion approved 3-0.
CONSENT CALENDAR
There were none.
ORAL COMMUNICATIONS
There were none.
WRITTEN COMMUNICATIONS
Acting Chair Funke acknowledged written correspondence received for Item A from the following senders:
- Kevin Fryer, on behalf of 18 additional residents
- Diane Glazman, City of Brisbane Public Arts Advisory Committee (PAAC) - Erin Becker
- Larisa Ocanada, San Mateo County Economic Development Association (SAMCEDA) - Michelle Bouchard, Caltrain
- Ali Sapirman, Housing Action Coalition
- Anthony Walker, City of Brisbane Open Space and Ecology Committee (OSEC) - Anthony Walker (individual)
- Ariel Cherbowsky, San Bruno Mountain Watch
- Ellison Folk, Shute, Mihaly & Weinberger LLP, on behalf of Unite Here Local 2 - Clara Johnson
OLD BUSINESS
There were none.
NEW BUSINESS
There were none.
Attachment 3
Brisbane Planning Commission Minutes
June 25, 2026
PUBLIC HEARING
A. PUBLIC HEARING: Baylands Subarea; Environmental Review 2021-ER-1, Specific Plan 2021-SP-1, Zoning Amendment 2021-RZ-3, General Plan Amendment 2021-GPA-2; Proposed Baylands Specific Plan including 2,200 residential units; 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses; 500,000 square feet of hotel use (approximately 800 rooms); a grade 6–8 middle school; 157 acres of open space/open area, parks, and trails; water, recycled water, sewer, drainage, electrical, and other utilities improvements on approximately 680.1 acres generally situated easterly of Bayshore Boulevard and west of Highway 101; related actions include amending the Brisbane General Plan Land Use and Circulation Elements, amending Title 17 of the Brisbane Municipal Code to establish zoning regulations, and adopting the Bayshore Mobility Plan. A Final Environmental Impact Report (FEIR) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). Baylands Development Inc., applicant; Sunquest Properties, majority owner; various owners.
Staff presented an overview of the requested entitlements, the Final EIR, site remediation and regulatory oversight, and the Mitigation Monitoring and Reporting Program, concluding with staff's recommended actions: that the Commission recommend the City Council (1) certify the Final EIR; (2) adopt the 2026 staff-recommended Specific Plan; (3) approve related amendments to the General Plan Land Use and Circulation Elements and Title 17 zoning; and (4) approve the Bayshore Mobility Plan, which would reduce Bayshore Boulevard from four lanes to two lanes south of Geneva Avenue.
The Commission asked staff about the expected timeline for landfill methane levels to fall below regulatory action levels, and the procedural relationship between the Bayshore Mobility Plan and the other recommended entitlements. Staff confirmed that Commission approval of the Mobility Plan is not required to advance the Specific Plan, but that EIR certification must occur before any other approvals, and that General Plan and zoning consistency must be established before the Specific Plan can be adopted.
Following staff's presentation and Commission questions, Acting Chair Funke opened the public hearing and invited the applicant, Stephanie Shakofsky of Baylands Development Inc. (BDI), to address the Commission. BDI's presentation noted that a middle school is not necessarily required and would ultimately depend on school district demand; requested greater flexibility in the 2026 staff-recommended Specific Plan's maximum parking ratio; raised a concern that the 2026 plan's phasing requirements are overly restrictive; and reiterated the applicant's continued opposition to the proposed high-speed rail light maintenance facility.
Following the applicant's presentation, Acting Chair Funke opened the hearing to public comment.
Storrs Hoen — Raised concerns about pile-driving construction noise and mitigation, requested regular post-construction testing of buildings, and asked that the Public Art ordinance not be superseded by the Specific Plan.
Attachment 3
Brisbane Planning Commission Minutes
June 25, 2026
Michele Salmon — Opposed the Bayshore Mobility Plan and raised safety concerns about potential contamination.
Anthony Walker, Open Space and Ecology Committee (OSEC) — Urged the Commission not to advance the project to Council until public concerns are addressed and an independent CEQA peer review is conducted; requested long-term greenhouse gas tracking and enforcement of the project's energy-neutrality commitment.
Larisa Ocañada, San Mateo County Economic Development Association (SAMCEDA) — Supported the project and urged FEIR certification and Specific Plan adoption.
Davin Chan, San Bruno Mountain Watch — Requested that the Mission Blue Nursery remain in its current location rather than relocate to Ice House Hill.
Jeremy Levine, Housing Leadership Council — Supported the project and urged flexibility in the plan and zoning to accommodate evolving construction technologies.
Denise Gregory — Opposed the project as proposed, stating it would worsen the regional jobs-housing imbalance and citing the FEIR's removal of greenhouse gas mitigation measures required under Measure JJ; asked whether sea-level rise impacts have been adequately considered.
Cynthia Gomez, Unite Here Local 2 — Opposed the project in its current form, citing a worsened housing crisis, contaminated soil remediation left in place under a cap, and removal of the energy-neutrality component required by Measure JJ.
Scott Beale, Plumbers, Pipefitters & HVAC Mechanics of San Mateo County — Supported the project on behalf of trades workers seeking local construction opportunities.
Brisbane resident, Local 467 Plumbers — Supported the project, citing benefits to workers, schools, and career opportunities for Brisbane residents.
Emily, Brisbane resident and HVACR apprentice — Supported the project as an opportunity for local apprentices to build careers and remain in the community.
Ignacio, Center for Creative Land Recycling (CCLR) — Supported the project, noting no known landfill cap breaches at other comparable closed developments such as Emeryville.
Eileen McLaughlin, Citizens Committee to Complete the Refuge — Referenced her comment letter submitted before the June 11 workshop and asked about the comment process.
Christina F. — Requested that the Bayshore Mobility Plan be excluded from the Commission's recommendation to Council; supported the road-diet concept generally but raised concerns about other components of the plan, and the developer's financial capacity to complete the project.
Ali Sapirman, Housing Action Coalition — Supported FEIR certification and Specific Plan adoption, citing the City's Regional Housing Needs Allocation (RHNA) obligations and the risk of Builder's Remedy exposure if the plan is not adopted.
Attachment 3
Brisbane Planning Commission Minutes
June 25, 2026
Mary Rogers, OSEC — Raised concern about whether the environmental analysis accurately reflects the Specific Plan as presented to the Commission.
Andy Yu, Local 104 — Supported the project, citing local construction jobs and economic benefit to the community.
Bart Pantoja, San Mateo County Building and Construction Trades Council — Supported the project, citing BDI's commitment to using local trades.
Tom Traeger, Local 104 — Supported the project, citing the value of union careers with good wages, healthcare, and pensions for keeping families in San Mateo County.
Jake Hilltack, Sheet Metal Workers Local 104 apprentice — Supported the project as a local-hire opportunity for apprentices.
Clara Johnson — Opposed the project as proposed, urging adoption of the Environmentally Superior Alternative, more detailed and enforceable mitigation measures, and an independent auditing entity with authority to stop work for noncompliance.
Michele Salmon — Reiterated concerns about site safety and potential forever chemicals, radioactive waste, and contamination at the former Stauffer Chemical and Lazzari Fuel sites.
Following public comment, the Commission discussed whether to close or continue the public hearing. City Attorney Phillips advised that if continued, the hearing should remain open to allow further public comment at the next meeting, and noted that CEQA's peer-review requirements apply only when a lead agency did not prepare its own EIR, which is not the case here, as the FEIR was prepared by the City's contracted consultants and reviewed by in-house and outside legal counsel.
Chair Funke asked that consultants address in greater depth at the next hearing community concerns regarding toxins and long-term safety, whether the FEIR adequately evaluates the project as proposed, consistency of the energy-neutrality commitment, the rationale for reduced greenhouse gas impact findings, and the City's long-term financial risk. Commissioner Sayasane recommended continuing the hearing to June 30 so the full Commission would be present and would have time to review the comments received.
A motion was made by Commissioner Sayasane and seconded by Commissioner Wodziak to continue the public hearing to Tuesday, June 30, 2026, at 6:30 p.m. Motion approved 3-0.
ITEMS INITIATED BY STAFF
Director Ayres announced that the Open Space Element item was continued to the July 16th City Council meeting.
ITEMS INITIATED BY THE COMMISSION
There were none.
Attachment 3
Brisbane Planning Commission Minutes
June 25, 2026
ADJOURNMENT
B. Acting Chairperson Funke adjourned to a special meeting of June 30, 2026, at a special start time of 6:30 p.m., at approximately 9:32 p.m.
Attest:
_______________________________________
Julia Ayres, Community Development Director
NOTE: A full video record of this meeting can be found on the City’s YouTube channel at www.youtube.com/BrisbaneCA, on the City’s website at http://www.brisbaneca.org/meetings, or on DVD (by request only) at City Hall.
Attachment 3
BRISBANE PLANNING COMMISSION
Action Minutes of June 30, 2026
Special Hybrid Meeting
CALL TO ORDER
Chairperson Gooding called the meeting to order at approximately 6:34 p.m.
ROLL CALL
Present: Commissioners Gooding, Lau, Sayasane, Wodziak, and Funke
Absent: None
Staff Present: Community Development Director Ayres, Senior Planner Robbins, and City Attorney Phillips
ADOPTION OF AGENDA
A motion was made by Commissioner Funke and seconded by Commissioner Sayasane to adopt the agenda. Motion approved 5-0.
ORAL COMMUNICATIONS
There were none; as a special meeting, oral communications were not on the agenda.
WRITTEN COMMUNICATIONS
Chair Gooding acknowledged written correspondence received since the June 25 meeting from the following senders:
- Clara Johnson, regarding Department of Fish and Wildlife requirements related to the EIR
- David Calb, regarding physical connections of the project to Brisbane - Sierra Club (resubmission of its June 10 letter)
- Michele Salmon (submission of an excerpt from a 2011 scoping meeting) - Travis Clark, in support of the project
- Michele Salmon, opposing the Bayshore Mobility Plan
- Dana Dillworth, regarding the EIR and the Specific Plan
PUBLIC HEARING
A. CONTINUED PUBLIC HEARING: Baylands Subarea; Environmental Review 2021-ER-1, Specific Plan 2021-SP-1, Zoning Amendment 2021-RZ-3, General Plan Amendment 2021-GPA-2 (continued from June 25, 2026)
Director Ayres recapped the June 25 hearing, at which the Commission heard staff's and the applicant's presentations, opened the public hearing and took public comment, directed staff to
Attachment 3
Brisbane Planning Commission Minutes
June 30, 2026
return with information on five topics, and continued the public hearing with the public hearing remaining open.
Staff and the consultant team Environmental Science Associates (ESA) and presented follow-up on the five requested topics: (1) the recommended Specific Plan is analyzed in the FEIR as Modified Alternative 1, with the same or fewer impacts than previously disclosed, and project evolution alone does not require recirculation absent new or more severe impacts; (2) site remediation follows a sequential, agency-approved process from scoping through implementation; (3) the City bears little direct liability, as the site is privately held and the Development Agreement will include enforcement and indemnification provisions; (4) GHG impacts are evaluated regionally and cumulatively per CARB guidance, and a draft offset-credit mitigation measure was removed as inconsistent with state climate policy, though other GHG measures remain; and (5) staff finds the project consistent with Measure JJ's energy-neutrality requirement, interpreted as carbon-neutral development supported by all-electric buildings, on-site solar, battery storage, and clean-choice grid power. Staff also clarified that density/intensity standards apply by land use designation rather than block by block, and flagged an internal inconsistency on where hospitality uses are permitted, presenting two options: limit to high-density commercial areas only, or also allow mid-density commercial areas.
Following staff's presentation and Commission questions, the Commission took comments from the following members of the public:
Dana Dillworth — Raised concerns about the inactivity of the Brisbane/Baylands community advisory group (BBCAG), requested public disclosure of approved remediation plans and cleanup phasing, and objected to counting the lagoon within the project's open space totals.
Nancy Lacsamana — Supported moving the project forward, citing the 20-year timeline and the economic need for commercial activity in central Brisbane.
Joe Marisini, Carpenters Union Local 217 — Supported the project on behalf of union members.
Storrs Hoen — Requested clarification on the phasing timeline for the solar field, responsible for repairing landfill caps damaged, and estimates noise-mitigation scenarios related to pile-driving.
Emily Wagner, HVACR technician, Local 467 — Supported the project, citing career and housing opportunities for young Brisbane residents and appreciation for the project team's safety focus.
Prem L. (remote) — Opposed the Bayshore Mobility Plan's lane reduction, citing impacts to central Brisbane businesses and emergency access.
Jennifer Chang Hetterly, Sierra Club (remote) — Requested a binding adaptive-management mitigation measure with public reporting and defined triggers requiring additional mitigation if monitoring shows changing site conditions.
Chris McIntosh, San Mateo County Bird Alliance (remote) — Requested stronger limits on light spillover into habitat areas, raptor perch deterrents near sensitive habitat and the shoreline, and bird-safe glass treatments on buildings.
Attachment 3
Brisbane Planning Commission Minutes
June 30, 2026
Gita Dev, Sierra Club Land Use Committee (remote) — Requested an independent peer review of the FEIR, raised concerns about the jobs-housing imbalance, and asked that biosafety level 3 laboratories require a conditional use permit.
Eileen McLaughlin, Citizens Committee to Complete the Refuge (remote) — Urged that shoreline open space be protected through a permanent conservation easement rather than a covenant.
Linda Salmon — Opposed the Bayshore Mobility Plan's proposed lane reduction.
Clara Johnson — Raised concerns regarding the need for detailed mitigation-measure methodology and timing, requested financial assurance, bonding, and indemnification covering landfill and hazardous-facility risks, and asked that biosafety level 3 and 4 laboratories be banned from the Baylands, and requested that an independent peer-review committee be appointed.
Susan DesJardin, Sierra Club Loma Prieta Chapter, Bay Alive Campaign (remote) — Expressed disappointment with the revised greenhouse gas analysis and requested periodic review and updating of construction and energy standards for future project phases.
Naomi Goodman, Sierra Club volunteer and environmental scientist (remote) — Raised concerns that the FEIR understates the timeline and risk associated with groundwater contamination at the adjacent Schlage Lock site in San Francisco.
Ali Sapirman, Housing Action Coalition and Bay Area Council (remote) — Supported the project, welcomed removal of the greenhouse gas offset-credit requirement as appropriate for transit-oriented infill housing, and urged FEIR certification and Specific Plan adoption.
Tom Elliard — Opposed the Bayshore Boulevard lane reduction, citing evacuation and bottleneck concerns.
Jordan Grimes, Greenbelt Alliance (remote) — Supported the project, agreed that the greenhouse gas offset-credit requirement was misapplied to infill housing, and urged FEIR certification and plan adoption.
Cynthia Gomez, Unite Here Local 2 — Opposed the project as proposed, citing the jobs-housing imbalance, a reduced remediation soil cap depth compared to earlier recommendations, and requested restoration of greenhouse gas mitigation measures removed from the FEIR.
Jeremy Levine, Housing Leadership Council — Supported the project, urging flexibility in height and design standards to accommodate a multi-decade build-out.
David Cobb — Supported the project generally, but raised concern that the plan's circulation design does not adequately connect the development to central Brisbane via the Sierra Point/Lagoon Way entrance.
Christina F. — Raised concerns about unclear liability for contamination, the applicant's development track record, and a lack of clarity in the Bayshore Mobility Plan's traffic-routing assumptions.
Attachment 3
Brisbane Planning Commission Minutes
June 30, 2026
Travis Clark — Supported the project overall, but noted the plan should have more housing and less commercial development.
Ron Burks — Opposed approving the project at this time, questioning the City's financial exposure and the resilience of landfill caps in a seismic event.
Christian Bustos and Fego Navarro, Lyrical Opposition — Spoke favorably of the applicant's past support for local arts programming and expressed hope that similar community-space commitments would continue if the project proceeds.
Janet Nito, Center for Creative Land Recycling — Supported the project generally, drawing on her prior experience with the Department of Toxic Substances Control (DTSC) and the site's community advisory group.
Following public comment, the applicant, Stephanie Shakofsky of Baylands Development Inc. (BDI), addressed remediation funding and long-term monitoring, citing the existing Sierra Point Environmental Management Association as a model for future property-owner-funded oversight; addressed the project's financial feasibility by citing Mission Bay, Emeryville, and Sierra Point as comparable, successfully redeveloped contaminated sites; and reaffirmed BDI's energy-neutrality commitment through on-site solar generation, battery storage, and enrollment in Peninsula Clean Energy for any remaining demand.
The Commission asked staff about regulation of biosafety level 3 and 4 laboratory uses (permitted above BSL-3 only through a conditional use process, consistent with the City's current treatment of the Sierra Point commercial district); how the Bayshore Mobility Plan (BMP) coordinates with regional and interjurisdictional transportation planning, including bicycle connectivity beyond Brisbane's boundaries and future Candlestick-area development; and the process by which the Commission could recommend approval of the Specific Plan or Mobility Plan with modifications. Staff confirmed that any such direction could be incorporated into the Commission's eventual motion. The Commission then directed staff to provide additional information on: how the BMP integrates with regional transportation plans and the feasibility of constructing right-of-way improvements proposed within the BMP without implementing a road diet; projects in California with carbon neutral/net-zero obligations; remediation requirements of the Schlage Lock site in San Francisco and whether it impacts on development and remediation of the Brisbane Baylands; and the role of anticipated property-owner associations in overseeing long-term remediation performance.
A motion was made by Commissioner Sayasane and seconded by Commissioner Funke to continue the public hearing to Thursday, July 23, 2026, at 7:30 p.m. Motion approved 5-0.
ITEMS INITIATED BY STAFF
There were none.
ITEMS INITIATED BY THE COMMISSION
There were none.
ADJOURNMENT
Attachment 3
Brisbane Planning Commission Minutes
June 30, 2026
B. Chairperson Gooding adjourned the meeting to the regular meeting of July 23, 2026, at approximately 9:44 p.m.
Attest:
_______________________________________
Julia Ayres, Community Development Director
NOTE: A full video record of this meeting can be found on the City’s YouTube channel at www.youtube.com/BrisbaneCA, on the City’s website at http://www.brisbaneca.org/meetings, or on DVD (by request only) at City Hall.
Attachment 3
DRAFT
BRISBANE PLANNING COMMISSION
Action Minutes of July 23, 2026
Regular Hybrid Meeting
CALL TO ORDER
Chairperson Gooding called the meeting to order at approximately 7:50 p.m.
ROLL CALL
Present: Commissioners Funke, Gooding, Lau, Sayasane, and Wodziak
Absent: None
Staff Present: Community Development Director Ayres, Deputy Public Works Director/City Engineer Yip, City Attorney Phillips, and Senior Planner Robbins
ADOPTION OF AGENDA
A motion was made by Commissioner Funke and seconded by Commissioner Wodziak to adopt the agenda. Motion approved 5-0.
CONSENT CALENDAR
A. Approval of draft meeting minutes of May 28, 2026
B. Approval of draft meeting minutes of June 11, 2026
C. Approval of draft meeting minutes of June 25, 2026
A motion was made by Commissioner Wodziak and seconded by Commissioner Funke to adopt the consent calendar. Motion approved 5-0.
ORAL COMMUNICATIONS
There were none.
WRITTEN COMMUNICATIONS
Chair Gooding acknowledged written correspondence received since the June 30, 2026, special meeting from the following senders:
- Anthony Walker, regarding greenhouse gases
- Bayshore Sanitary District, regarding compliance and agreement between the proposed plan and their protocols
- Kim Follien, in support of the Specific Plan
- Clara Johnson, regarding numerous items in the EIR
- Baylands Development Inc. (BDI), in response to questions from the last meeting (resubmission of its July 17 letter also included in the agenda report) DRAFT
Attachment 3
DRAFT
Brisbane Planning Commission Minutes
July 23, 2026
- Christina Florkowski, regarding the Geneva Avenue extension
PUBLIC HEARING
A. CONTINUED PUBLIC HEARING: Baylands Subarea; Environmental Review 2021-ER-1, Specific Plan 2021-SP-1, Zoning Amendment 2021-RZ-3, General Plan Amendment 2021-GPA-2 (continued from June 30, 2026); Proposed Baylands Specific Plan including 2,200 residential units; 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses; 500,000 square feet of hotel use (approximately 800 rooms); a grade 6–8 middle school; 157 acres of open space/open area, parks, and trails; water, recycled water, sewer, drainage, electrical, and other utilities improvements on approximately 680.1 acres generally situated easterly of Bayshore Boulevard and west of Highway 101; related actions include amending the Brisbane General Plan Land Use and Circulation Elements, amending Title 17 of the Brisbane Municipal Code to establish zoning regulations, and adopting the Bayshore Mobility Plan. A Final Environmental Impact Report (FEIR) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). Baylands Development Inc., applicant; Sunquest Properties, majority owner.
The in-person consultant team consisted of: Terri Avila of ESA (with additional ESA specialists in air quality, energy, GHG, noise, cultural resources, hazards, and water), Matt Goyne of Fehr & Peers, SiteLab (urban design), and Michelle King of EKI. The remote consultant team included John Montgomery Brown of EKI and additional ESA land use and planning staff.
Staff recapped the five topics addressed in response to the Commission's direction from June 30, 2026, and presented follow-up information on four additional topics raised by the Commission:
(1) the Bayshore Mobility Plan's (BMP) relationship to regional transportation plans and the feasibility of right-of-way improvements without a road diet – regional and state plans do not require Bayshore Boulevard to remain four lanes, though a continuous Class I bike path while retaining four lanes would require additional engineering study in constrained segments; (2) examples of California projects with required or voluntary net-zero greenhouse gas commitments – none of the cited projects' circumstances apply to the Baylands; (3) remediation requirements related to the Schlage Lock groundwater plume – development will be required to prevent vapor-intrusion exposure to chlorinated volatile organic compounds through a site-specific risk assessment or vapor-intrusion mitigation, per the approved remedial action plan; and (4) the role of site-specific environmental management associations (SEMAs) in overseeing large contaminated sites – modeled on the Sierra Point Environmental Management Association (SPEMA), a mandatory property-owner association created by Regional Water Board order in 1999.
Staff also presented recommended clarifications to the Specific Plan: Chapter 3 clarifications on how minimum density and intensity are averaged across the plan area, including the Caltrain station area; a modification to permit hospitality uses in both high-density and mid-density commercial designations; and Chapter 9 clarifications on how the state-regulated remediation DRAFT
Attachment 3
DRAFT
Brisbane Planning Commission Minutes
July 23, 2026
and monitoring process relates to city permitting and development review. Staff reaffirmed its recommendation that the Commission recommend the City Council certify the Final EIR, adopt the 2026 staff-recommended Specific Plan with the stated clarifications, approve related General Plan and Title 17 zoning amendments, and approve the Bayshore Mobility Plan.
The Commission's questions to staff, the applicant, and consultants covered: how a SEMA-type association would be governed, funded, and enforced, including quarterly groundwater monitoring, quarterly and five-year regulatory inspections, environmental insurance, and land use covenants running with the land; the feasibility of a Class I sidewalk or path along Bayshore Boulevard outside the project frontage without reducing travel lanes; whether a road-diet configuration could be reversed for emergency access; whether the Specific Plan requires any ongoing greenhouse gas tracking following removal of the net-zero mitigation measure from the Final EIR; whether the future battery storage field could be made a binding or enforceable commitment (staff indicated this is better addressed through the Development Agreement, which the Commission will also review); further detail on the proposed Chapter 9 remediation-monitoring and reporting clarifications; and a summary of Modified Alternative 1, which reduces the number and height of towers near the Caltrain right-of-way, shifts density to lower- and medium-density designations further east, and accommodates the high-speed rail light maintenance facility (LMF). The applicant confirmed it does not yet have a position on Sierra Club's request for a conservation easement or San Bruno Mountain Watch's request that the Mission Blue Nursery remain at its current location, noting design and community-outreach work is ongoing.
Following staff's presentation and Commission questions, the Commission took comments from the following members of the public:
Ali Sapirman, Housing Action Coalition and Bay Area Council — Urged the Commission to act, noting the State's recent revocation of Brisbane's housing element compliance finding and the resulting exposure to Builder's Remedy, loss of funding, and litigation risk; urged recommending approval of the Specific Plan and Final EIR.
Darren Clark, Carpenters Local 217 — Supported the project, urging a responsible general contractor committed to area-standard wages, apprenticeships, and healthcare.
Arturo Sainz, Laborers Local 261 — Supported the project, citing the training and safety qualifications of union laborers to safely perform remediation and construction work.
Erin Becker — Asked that the Commission recommend updating the City's Dark Skies Ordinance to include the Baylands zoning district, and urged consideration of Alternative 7 (reduced density and height) rather than committing to the full 2,200 units.
Storrs Hoen — Requested that drilled-shaft and rectangular-barrette pile-installation methods be included as options to reduce construction noise, and requested a continuous, low-friction bicycle route through the project connecting San Francisco to Sierra Point/Oyster Point.
DRAFT
Attachment 3
DRAFT
Brisbane Planning Commission Minutes
July 23, 2026
Melissa Foley, San Francisco Estuary Institute (remote) — Supported the project's native-plant and wildlife-safe design commitments, calling the plan's landscape-scale approach to habitat connectivity commendable.
Jordan Grimes, Greenbelt Alliance (remote) — Supported the project, welcomed removal of the greenhouse gas offset-credit mitigation measure as appropriate for transit-oriented infill housing, and urged the Commission to advance the plan without pursuing Alternative 7.
Eileen McLaughlin, Citizens Committee to Complete the Refuge (remote) — Requested that a conservation easement, which runs with the land, be used to permanently protect restored habitat, whether in the Specific Plan or the Development Agreement.
Linda Salmon — Opposed siting single-family homes on landfill caps, citing seismic and sea-level-rise risk; suggested rental housing over commercial uses as an alternative, and renewed a suggestion for light-rail connection through Brisbane to South San Francisco in place of the road diet.
Anthony Walker, (speaking as an individual) — Raised concerns that the plan relies on community-choice (clean) energy procurement without first pursuing an intermediate step of additional community-scale renewable generation within Brisbane, as called for in the City's sustainability framework.
Nicole Westrom — Asked the Commission to consider stakeholders without a voice in the process, including the land's original inhabitants and future residents, and to continue seeking broad, accessible public participation.
Michele Salmon — Raised concerns about the adequacy of long-term testing given the site's undocumented, unlined landfill history, distinguished the site from the more thoroughly closed and monitored Sierra Point landfill, and opposed the Bayshore Mobility Plan.
Cynthia Gomez, Unite Here Local 2 — Reiterated opposition to the project's jobs-housing imbalance, noting no state law requires the City to accept 6.5 million square feet of commercial development.
Elana S — Opposed the Bayshore Mobility Plan's lane reduction, citing anticipated diversion of Tunnel Avenue traffic during construction, and requested robust enforcement of nighttime noise limits during pile driving.
Christina F. — Raised concerns about the scale and pace of the proposed transformation relative to the size of Brisbane, and asked that the project be considered incrementally rather than as a single, unified approval.
Following public comment, the applicant, represented by Stephanie Shakofsky of Baylands Development Inc., invited the project's engineer of record Jay Merani of Geosyntec to review the remediation implementation approach, including removal of identified soil contamination, import of approved clean fill, installation of a demarcation layer and clean soil cap, and procedures for maintaining the cap during future utility work, sampling, or foundation installation.
DRAFT
Attachment 3
DRAFT
Brisbane Planning Commission Minutes
July 23, 2026
After the presentation from the applicant, a motion was made by Commissioner Sayasane and seconded by Commissioner Wodziak to close the public hearing. Motion approved 5-0.
The Commission then began deliberations, starting with the Bayshore Mobility Plan. Individual commissioners expressed a range of views: several commissioners opposed the road diet's lane reduction, citing concerns about traffic diversion and a desire to explore alternative traffic-calming and multimodal safety measures instead; one commissioner expressed openness to the complete-streets concept underlying the road diet while acknowledging the need for further study.
A motion was made by Chairperson Gooding and seconded by Commissioner Sayasane to adopt Resolution PC-01-26, recommending that the City Council adopt the Bayshore Mobility Plan, modified to retain only those elements directly benefiting the Baylands project's circulation, eliminate the road-diet lane-reduction elements, and direct further study of the feasibility of a continuous Class I path or comparable sidewalk improvement along the remainder of Bayshore Boulevard. Motion approved 4-1 (Funke voting “no”).
The Commission then began preliminary discussion of the remaining General Plan and Title 17 zoning amendments Given the significance of topics remaining and the lateness of the meeting, the Commission agreed to continue its deliberations at another meeting.
A motion was made by Commissioner Funke and seconded by Commissioner Sayasane to continue the meeting to August 13, 2026, with a special start time of 6:30 p.m. Motion approved 5-0.
ITEMS INITIATED BY STAFF
There were none.
ITEMS INITIATED BY THE COMMISSION
There were none.
ADJOURNMENT
B. Chairperson Gooding adjourned the meeting to the regular meeting of August 13, 2026, at a special start time of 6:30 p.m., at approximately 10:35 p.m.
Attest:
_______________________________________
Julia Ayres, Community Development Director
NOTE: A full video record of this meeting can be found on the City's YouTube channel at www.youtube.com/BrisbaneCA, on the City's website at http://www.brisbaneca.org/meetings, or on DVD (by request only) at City Hall.
DRAFT
Attachment 3
DRAFT
BRISBANE PLANNING COMMISSION
Action Minutes of August 13, 2026
Special Hybrid Meeting
CALL TO ORDER
Chairperson Gooding called the meeting to order at approximately 6:30 p.m.
ROLL CALL
Present: Commissioners Funke, Gooding, Lau, Sayasane, and Wodziak
Absent: None
Staff Present: Community Development Director Ayres, Director of Public Works Bozorginia, Deputy Public Works Director/City Engineer Yip, City Attorney Phillips, and Associate Planner Whitney
ADOPTION OF AGENDA
A motion was made by Commissioner Funke and seconded by Commissioner Wodziak to adopt the agenda. Motion approved 5-0.
CONSENT CALENDAR
A. Approval of draft meeting minutes of June 30, 2026
A motion was made by Commissioner Wodziak and seconded by Commissioner Funke to adopt the consent calendar. Motion approved 5-0.
ORAL COMMUNICATIONS
There were none.
WRITTEN COMMUNICATIONS
Chair Gooding acknowledged the following written correspondence received since the July 23, 2026 meeting:
- Michele Salmon, regarding the Bayshore Mobility Plan
- Melissa Foley, regarding ecological planning and design guidance
OLD BUSINESS
A. CONTINUED: Baylands Subarea; Environmental Review 2021-ER-1, Specific Plan 2021-SP-1, Zoning Amendment 2021-RZ-3, General Plan Amendment 2021-GPA-2 (public hearing closed July 23, 2026; Commission deliberations continued); Proposed Baylands Specific Plan including 2,200 residential units; 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses; 500,000 square feet of hotel use (approximately 800 rooms); a grade 6–8 DRAFT
Attachment 3
middle school; 157 acres of open space/open area, parks, and trails; water, recycled water, sewer, drainage, electrical, and other utilities improvements on approximately 680.1 acres generally situated easterly of Bayshore Boulevard and west of Highway 101; related actions include amending the Brisbane General Plan Land Use and Circulation Elements, amending Title 17 of the Brisbane Municipal Code to establish zoning regulations, and adopting the Bayshore Mobility Plan. A Final Environmental Impact Report (FEIR) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). Baylands Development Inc., applicant; Sunquest Properties, majority owner; see Attachment 9 for a complete list of owners.
The in-person consultant team consisted of: Brian Boxer of ESA and Michael Burns of ESA. The remote consultant team consisted of: John Montgomery Brown of EKI, Terri Avila of ESA, Susan Yogi of ESA, Brian Schuster of ESA, Chris Dugan of ESA, Brian Pittman of ESA, Ashleigh Sims of ESA, Kathy Cleveland of ESA, Matt Brennan of ESA, Todd Gordon of ESA, Beverly Choi of ESA, Erik Calloway of ESA, John Holmes of Fehr & Peers, Ashutosh Singhal of SiteLab, and Woody Hanson of SiteLab.
Director Ayres recapped the July 23, 2026 meeting. Staff then summarized the topics identified by the Commission to guide deliberations:
1. Connectivity between the Baylands, Central Brisbane, and Sierra Point, including pedestrian and bicycle infrastructure and downtown shuttle options.
2. Inclusion of amenity and active ground-floor uses serving residential districts.
3. Consistency with Measure JJ's sustainability framework and energy-neutrality requirement, including reliance on off-site renewable energy procurement to close any remaining gap beyond on-site generation.
4. Post-development monitoring of the closed landfill and remediated operating units, including anticipated inspection and testing frequencies pending final regulatory approval.
5. Specific use considerations, including the biosafety-level threshold for by-right versus conditionally permitted laboratory uses (by-right up to BSL-3, conditional use permit above that level, consistent with Sierra Point) and whether cross-referencing the City's Dark Skies Ordinance is necessary given that the Specific Plan's lighting standards are at least as stringent.
Commission discussion and questions covered clarification that off-site renewable energy procurement (through PG&E or a community energy provider) would supplement on-site generation to maintain carbon neutrality, with a smaller anticipated gap than originally projected; whether a future battery storage field should be a binding requirement; and confirmation that the City's Dark Skies Ordinance applies citywide regardless of zoning, and that the Specific Plan's lighting standards meet or exceed its requirements. The Commission also discussed the Sierra Club's June 10, 2026 letter requesting expanded conservation easements and San Bruno Mountain Watch's request that the Mission Blue Nursery remain at its current location.
DRAFT
Attachment 3
Following discussion, the Chair proposed, and the Commission reached consensus on, a framework motion to adopt the staff-recommended Baylands Specific Plan dated May 2026, including the clarifications and cleanup edits presented on July 23, 2026, along with the related General Plan Land Use and Circulation Element amendments and Title 17 zoning amendments, and to recommend the following items for City Council consideration:
• Remediation: Require that all reporting submitted to regulatory agencies be concurrently submitted to the City for the City to make available to the public. Require that regulatory reports be current at time of permit issuance, inspection, and occupancy; if not, the City will withhold permits or cease processing. Post-occupancy, require that regulatory reports remain current and be submitted concurrently to the City to make available for public inspection; if not, direct that the City address the matter through various oversight mechanisms, including discretionary permit revocation (if applicable), or code enforcement.
• Energy: Require implementation of an audit mechanism monitoring the project's energy use and generation over build out, with built-in consequences should targets not be reached.
• Lab Uses: Require that Chapter 3 land use regulations be amended to require Conditional Use Permit approval for laboratory uses classified as BSL-3 and above. • Circulation: Direct Council to consider restricting use and/or design of Class I bicycle facilities specifically to avoid collisions between pedestrians and cyclists with e-bikes and e-scooters, and to consider upgrading the Baylands-Central Brisbane shuttle schedule to serve during the afternoon and later in the evening. • Mission Blue Nursery: Recommend that Council allow the nursery to remain in its current location unless or until a feasible option can be provided. • Open Space: Require conservation easements beyond what the Plan presently envisions for all open space areas, per the Sierra Club's June 10 letter. • Implementation: Direct Council to implement staff's recommended edits presented in the 7/23 agenda report to clarify the anticipated remediation process and relationship to city permitting.
• Hospitality Zoning and Building Types: Direct Council to implement staff's recommended edits to Chapter 3 presented in the 7/23 agenda report to clarify that hospitality uses and building types are permitted in the medium density commercial district.
• Residential Density and Commercial Intensity: Direct Council to implement staff's recommended edits to Chapter 3 presented in the 7/23 agenda report to clarify that minimum residential density and commercial intensity standards are applied on an average basis by land use designation and are not evaluated on a block-by-block basis.
A motion was made by Chairperson Gooding and seconded by Commissioner Funke to adopt the Staff-Recommended Specific Plan (May 2026), including the staff-suggested July 23, 2026 edits, via adoption of Planning Commission Resolution No. 2021-ER-1/2021-SP-1/2021-RZ-3/2021- GPA-2, modified to incorporate the Commission's recommendations. The motion was approved 5-0.
DRAFT
Attachment 3
The Chair noted that the Bayshore Mobility Plan recommendation was acted on separately via adoption of Resolution PC-01-26 at the July 23, 2026 meeting, and that community-benefits topics raised during discussion will be considered separately as part of the forthcoming Development Agreement, which will be reviewed by the Commission before proceeding to the City Council.
ITEMS INITIATED BY STAFF
There were none.
ITEMS INITIATED BY THE COMMISSION
There were none.
ADJOURNMENT
B. Chairperson Gooding adjourned the meeting to the regular meeting of August 27, 2026, at approximately 8:51 p.m.
Attest:
_______________________________________
Julia Ayres, Community Development Director
NOTE: A full video record of this meeting can be found on the City's YouTube channel at www.youtube.com/BrisbaneCA, on the City's website at http://www.brisbaneca.org/meetings, or on DVD (by request only) at City Hall.
DRAFT
Attachment 3
Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 15
Attachment 15: Notice of Public Hearing: Planning Commission - June 25, 2026 Notice of Public Hearing: Planning Commission - June 25, 2026 https://www.brisbaneca.gov/DocumentCenter/View/2984/6-25-26---Environmental-Review-2021-ER-2-Specific-Plan-2021-SP-1-Zoning-Amend-2021-RZ-3--GP-Amend-2021-GPA-1-for-the-Baylands 1
Attachment 3
Printed on 50% recycled paper Providing for Today, Preparing for Tomorrow City of Brisbane
50 Park Place
Brisbane, CA 94005-1310
415-508-2120
415-467-4989 Fax
NOTICE OF CITY COUNCIL PUBLIC HEARING TO CONSIDER APPROVAL OF
THE BRISBANE BAYLANDS GENERAL PLAN AMENDMENTS,
BAYLANDS SPECIFIC PLAN, AMENDMENTS TO BRISBANE MUNICIPAL CODE, TITLE 17, ZONING, BAYSHORE MOBILITY PLAN, AND THE RELATED FINAL ENVIRONMENTAL IMPACT REPORT (SCH# 2006022136)
Notice is hereby given that a hybrid public hearing will be held by the City of Brisbane City Council on Monday, September 14, 2026, at 5:30 p.m., allowing public participation in-person at Brisbane City Hall, 50 Park Place, Brisbane, AND virtually via Zoom at brisbaneca.gov/cc-zoom, and broadcast on local Comcast channel 27 and the City’s YouTube channel, to consider the Baylands General Plan Amendments; Baylands Specific Plan; Amendments to Brisbane Municipal Code, Title 17, Zoning; Bayshore Mobility Plan; and the related Final Environmental Impact Report.
Project Approval and Actions
The City Council will consider approving the proposed project, an alternative, or a variation thereof including modified conditions and mitigation measures. As part of this approval, the City Council is proposing to take the following actions:
1. Certify the Final Environmental Impact Report (Final EIR) and adopt the Water Supply Assessment, Findings, Statement of Overriding Considerations, and Mitigation Monitoring and Reporting Program (MMRP).
2. Approve the project entitlements, which include:
• Amending the General Plan Land Use Element to realign the northern boundary of the Baylands Subarea to correspond to the boundary of the Baylands Specific Plan. • Amending the General Plan Circulation Element to:
o Realign Lagoon Road to directly access the southbound US 101 freeway ramps at Sierra Point Parkway.
o Extend Sierra Point Parkway from its current terminus at the southbound US 101 freeway ramps north to Geneva Avenue.
o Add proposed Baylands roadways to the General Plan circulation map. o Designate the Geneva Avenue extension through the Baylands as a Regional Arterial. o Add a new roadway type for “green local streets.”
• Adopting the Baylands Specific Plan, which includes:
o Land use designations and development standards for 2,200 residential units clustered in the northwestern portion of the site in proximity to the Bayshore Caltrain station; 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses; 500,000 square feet of hotel use (approximately 800 rooms); a grade 6–8 middle school; and open space/open area, parks, and trails;
o Policies related to sustainability, utilities, and infrastructure improvements; and o Implementation measures.
Baylands Specific Plan and EIR Meeting 1
ATTACHMENT 16
Attachment 3
Printed on 50% recycled paper Providing for Today, Preparing for Tomorrow • Amending Title 17, Zoning, of the Brisbane Municipal Code to:
o Change the zoning designations of land within the Baylands Specific Plan area from Commercial Mixed-Use (C-1), Marsh Lagoon Bayfront (MLB), Manufacturing (M-1) to Baylands Specific Plan (BSP); and
o Establish the land use regulations and development standards set forth in the Specific Plan as the regulatory authority governing future development within the Specific Plan area; o Delete Chapter 17.41, Interim Uses In The Baylands Subarea; and o Amend the City’s Zoning Map to reflect the Baylands Specific Plan zone changes. • Approve the Bayshore Mobility Plan, which calls for enhancing the mobility for Brisbane residents and businesses by reducing the number of travel lanes along Bayshore Boulevard from four lanes (two in each direction) to two lanes (one in each direction) south of Geneva Avenue, along with providing a median, turn pockets, and a multi-use pathway and bicycle facilities along the corridor within the City of Brisbane.
The actions described above were considered by the Brisbane Planning Commission on June 25, June 30, July 14, July 23, and August 13, 2026, which meetings were duly noticed in compliance with the California Government Code. The Planning Commission recommended that the City Council adopt the 2026 Staff Recommended Baylands Specific Plan with the following modifications:
1. Remediation: All reporting submitted to regulatory agencies should be concurrently submitted to the City for the City to make available to the public. Regulatory reports should be current at time of permit issuance, inspection, and occupancy; if not, City will withhold permits or cease processing. Post-occupancy, regulatory reports must remain current and submitted concurrently to the City to make available for public inspection. If not, the matter would be addressed by the City through various oversight mechanisms including discretionary permit revocation (if applicable), or code enforcement.
2. Energy: An audit mechanism monitoring the project’s energy use and generation over build out, that has built in consequences should targets not be reached, should be implemented.
3. Lab Uses: Chapter 3 land use regulations should be amended to require Conditional Use Permit approval for laboratory uses classified as BSL-3 and above.
4. Circulation: Council should consider restricting use and/or design of Class I bicycle facilities specifically to avoid collisions between pedestrians and cyclists with e-bikes and e-scooters. Council should consider upgrading the Baylands-Central Brisbane shuttle schedule to serve during the afternoon and later in the evening.
5. Mission Blue Nursery: Recommend Council allow nursery to remain in its current location unless or until a feasible option can be provided.
6. Open Space: Conservation easements beyond what the Plan presently envisions should be required for all open space areas, per the Sierra Club's June 10 letter.
7. Implementation: Council should implement staff’s recommended edits presented in the 7/23 agenda report to clarify the anticipated remediation process and relationship to city permitting.
8. Hospitality Zoning and Building Types: Council should implement staff’s recommended edits to Chapter 3 presented in the 7/23 agenda report to clarify that hospitality uses and building types are permitted in the medium density commercial district.
9. Residential Density and Commercial Intensity: Council should implement staff’s recommended edits to Chapter 3 presented in the 7/23 agenda report to clarify that minimum residential density and commercial intensity standards are applied on an average basis by land use designation and are not evaluated on a block-by-block basis.
The Planning Commission also recommended that the City Council adopt the General Plan and Zoning Ordinance amendments, certify the Final EIR, and adopt provisions of the Bayshore Mobility Plan specifically related to implementation of mitigation measures in the Final EIR, excluding all other provisions including the proposed “road diet” on Bayshore Boulevard. The City Council will consider these recommendations.
Baylands Specific Plan and EIR Meeting 1
ATTACHMENT 16
Attachment 3
Printed on 50% recycled paper Providing for Today, Preparing for Tomorrow Details regarding the Baylands project are as follows:
APPLICATION NO.: 2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2 APPLICANT/OWNER: Baylands Development Inc., Applicant/Various owners – refer to Attachment 1 LOCATION: Bayshore Boulevard and U.S. 101, Brisbane, San Mateo County, California, 94005
(Various Assessor’s Parcel Nos. [APNs] – refer to Attachment 1) ZONING: Commercial Mixed Use (C-1), Marsh Lagoon Bayfront (MLB), Manufacturing (M-1), Heavy Commercial (HC)
REQUEST: The above-referenced applications are to adopt and implement the Baylands Specific Plan, a Specific Plan for the Baylands subarea of the City of Brisbane.
The Specific Plan would establish development regulations and standards that would allow for development of:
• 2,200 residential units;
• 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses;
• 500,000 square feet of hotel use (approximately 800 rooms); • A grade 6–8 middle school;
• 157 acres of open space/open area, parks, and trails; • Water, recycled water, sewer, drainage, electrical, and other utilities improvements;
• Relocation of Brisbane’s existing Fire Station No. 81 and establishment of a second fire station; and
• Improvements to Bayshore Boulevard contained within the Bayshore Mobility Plan.
A detailed description of project approvals and actions is provided above under “Project Approval and Actions.”
ENVIRONMENTAL
STATUS: A Final Environmental Impact Report (FEIR) (SCH #2006022136) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). The FEIR includes the Draft EIR (DEIR), revisions to the DEIR, comments received on the DEIR, a list of commenters, the City’s responses to significant environmental points raised during the DEIR comment period, and any other information added by the City.
HOW TO PARTICIPATE IN AND VIEW THE MEETING
The public may observe the City Council meeting and/or address the Council remotely or in person at:
• Community Meeting Room, Brisbane City Hall, 50 Park Place, Brisbane • Virtually via Zoom at brisbaneca.gov/cc-zoom.
Baylands Specific Plan and EIR Meeting 1
ATTACHMENT 16
Attachment 3
Printed on 50% recycled paper Providing for Today, Preparing for Tomorrow The meeting will be broadcast on:
• The City’s YouTube channel at https://youtube.com/BrisbaneCA; and • Local Comcast Channel 27.
HOW TO PROVIDE COMMENTS
Written Comments
Written comments can be submitted prior to the meeting, by 4 p.m. on September 14, 2026 via email to [email protected]. Public comments received by this deadline will be provided to the City Council via email, incorporated into the record of the agenda item posted on the Internet at: www.brisbaneca.gov/meetings, and made available in hard copy in the Community Meeting Room lobby at City Hall.
Verbal Comments During the Public Hearing: The public has the following options to make verbal comments during the public hearing:
• If attending the hearing in person at City Hall, please fill out the speaker request form provided in the Community Meeting Room and give the form to staff. Staff will notify the Mayor of your request to address the Council and you will be called by the Mayor to address the Council. • If viewing the meeting remotely via Zoom, YouTube, or Channel 27, please join the Zoom meeting using the URL listed on this notice and the September 14, 2026 agenda, or call the teleconference phone number.
AVAILABILITY OF PROJECT MATERIALS
The project materials, including the FEIR, the proposed General Plan Amendments, Specific Plan, Zoning Amendments, and Mobility Plan may be viewed at www.brisbaneca.gov/774/FEIR, www.brisbaneca.gov/775/BSP, and www.brisbaneca.gov/232/. Hard copies of the project materials may also be viewed at City Hall during open hours. The meeting agenda and staff report will be published on the City’s website at www.brisbaneca.gov/meetings after 5 p.m. on September 4, 2026.
If you challenge this project in court, you may be limited to raising only those issues you or someone else raised at the public hearing, described in this notice, or in written correspondence delivered to the City Council at, or prior to, the public hearing. Written correspondence is usually considered a public record and subject to disclosure.
Any attendee who wishes to request accommodation for a disability should contact the City Clerk at least forty-eight hours prior to the meeting at (415) 508-2110 or email [email protected].
Questions about the application may also be directed to Julia Ayres, Community Development Director, by email or at the phone number below.
Phone: (415) 508-2120
Email: [email protected]
DATED: September 4, 2026 __________________________________________ Julia Ayres, Director, Community Development
ATTACHMENTS
1. List of APNs and property owners within the Baylands Specific Plan area Baylands Specific Plan and EIR Meeting 1
ATTACHMENT 16
Attachment 3
ATTACHMENT 1
Printed on 50% recycled paper Providing for Today, Preparing for Tomorrow List of Assessor’s Parcel Numbers within the Plan Area
005152060
005152240
005152250
005152260
005152270
005162190
005162200
005162210
005162220
005162240
005162250
005162260
005162270
005162280
005162300
005162320
005162330
005162350
005162360
005162370
005162390
005162400
005162410
005162420
005162430
005165010
005250020
005311010
005311020
005311070
005311090
005311100
005311110
005311120
005312070
005312100
005312110
005312120
005320020
005340030
005340040
005340050
005340060
005340080
005340090
005340100
005340110
005340120
005350020
005350060
005350070
005350080
007136010
007136020
007136030
007136040
007136050
007136060
007136070
007136080
007137010
007137020
007138010
007138020
007138030
007138040
007139010
007139020
007143010
007143020
007143030
007143050
007143060
007143070
007143080
007143090
007143100
007143110
007147010
007147020
007147030
007147040
007148010
007148020
007148030
007148040
007148050
007148060
007150020
007150060
007580020
096010030
List of Property Owners within the Plan Area continues on following page.
Baylands Specific Plan and EIR Meeting 1
ATTACHMENT 16
Attachment 3
ATTACHMENT 1
Printed on 50% recycled paper Providing for Today, Preparing for Tomorrow List of Property Owners within 300 feet of the Plan Area City and County of San
Francisco
San Mateo County
• VISITACION INVESTMENT
LLC
• CA DEPT OF
TRANSPORTATION
• RECOLOGY PROPERTIES
INC
• SOUTHERN PAC
TRANSPORTATION CO
• VISITACION INVESTMENT
LLC
• SILVESTRI FAMILY
LIMITED PARTN
• LOUIS R & JERI W
PIETRELLI TR
• LOUIS R & JERI W
PIETRELLI
• HU-KWONG FMLY REVOC
TR
• VO DUONG
• MATTHEW YIN
• SILVESTRI BYPASS TRUST
• ANNA S JEW RVOC LVG TR
2007
• SILVESTRI BYPASS TRUST
• SUBURBAN PROPANE L P
• O'BRIEN JOHN NADER
• THT LLC
• LINCOLN PROPERTIES LLC
• LIANG ZHEN QIANG
• DALMACIO GLENN
FERNANDEZ TR
• REITER JOHN STRATTON
• ATANA GEORGIO
• RAVI ROHITH
• SFPP
• JOHNS JOSHUA M
• 511 TUNNEL AVENUE LLC
• LEE JOHN TR
• KOPP PATRICIA J TR
• PFEFFER JERRY TR
• BAYSHORE BRISBANE
INVESTMENT LLC
• VILLACARLOS EUGENIO A
EST OF
• REY GERTRUDE S
• LI WEI HAI
• TUNTEX U S A INC
• SUNTEX PROPERTIES INC
• L & C DIVERSIFIED LLC
• SIERRA HOTEL
MANAGEMENT CORP
• GUADALUPE VALLEY
MUNICIPAL
• NORTH AMERICAN
GLOBAL INV PROP LLC
• ADAMS MARK
• HUANG WEI TR
• PANONTIN IVANA TR
• M & L ASSOCIATES
• DCT VALLEY DRIVE CA LP
• WALTERS LOTTIE M
• SIERRA POINT MOBILE
HOME PARK LLC
• CAREY HELEN J TR
• BROOKS MICHELE DAY
• TWOMEY DEBORAH L TR
• CAVA DAVID ET AL
• BULLOCK JOSEPH J III TR
• SILVESTRI PAOLA TR ET
AL
• SILVESTRI ALFEO &
PAOLA
• NIJEM MAHER H &
MARRIANA L
• BAYSHORE SANITARY
DIST
• EARTHSQUEAK LLC
• STATE OF CALIF
• DENNIS LETA M
• BUTTERFLY VALLEY
DEVELOPMENT LLC
• SB DOMESTIC LLC
• LEE DAN WAI KIT TR
• AGL HILL DRIVE OWNER
LLC
• MORTIMER JULIE D C
• M&E BRISBANE
• TAMU LUKE AMUKHALE
• BAYSHORE SANITARY
DISTRICT
• HENRIQUEZ JOSE
• WONG LUN-HONG
• GALARZA ARNOLD J TR
• O'BRIEN JOHN N
• PRYSHEPA MARY LOU N/A
• REYES CARLOS D &
ALBERTINA M
• CHIN CAROLINE K
• OVERTON DEBRA L TR
• RECOLOGY PROPERTIES
INC
• SANITARY FILL COMPANY
• BRUNO MOUNTAIN LLC
• CALLAN MATTHEW C
• CSHV CROCKER LLC
• BRISBANE PROPERTIES
• CITISTART INC
• SCHMITZ STEVEN J TR
• NIJEM HAMDI A & HANA
• DENNIS EDWARD J
• THREEANDNINE LLC
• NERHAN KEET
• MECA BUILDERS INC
• HOLDINGS 22 LLC ET AL
• THE SOUTHLAND CORP
• BMR BAYSHORE BLVD
LLC
Baylands Specific Plan and EIR Meeting 1
ATTACHMENT 16
Attachment 3
Attachment 4
Agency Responsibility for Baylands Site Remediation and Landfill Closure
101
UPC OU-SM
(DTSC)
OU-2
(RWQCB)
San
Brisbane Landfill
Francisco
(RWQCB)
Bay
shore Biva
Tunnel Ave
Brisbane
Lagoon
ATTACHMENT 2
Special Meeting 11.09.26
Water Supply Assessment for the Baylands Specific Plan (EKI Environment & Water, January 2025), FEIR Appendix P (link)
ATTACHMENT 3
Water Supply Technical Analysis
November 9, 2026, City Council Staff Report – Water Infrastructure (Measure JJ Topic 3.B) This attachment provides the detailed technical analysis summarized in the Discussion section of the November 9, 2026, staff report on Water Infrastructure (Measure JJ Topic 3.B). It includes the Water Supply Assessment (WSA) findings (Section 1); the proposed water provider and agency approvals (Section 2); the water recycling facility (Section 3); wastewater and Bayshore Sanitary District coordination (Section 4); on-site water infrastructure and phasing (Section 5); and full responses to hearing questions (Section 6). References to “this report” mean the November 9, 2026, staff report and its attachments. An acronym list is provided at the end.
1. Water Supply Assessment Findings
Key Takeaway: The WSA finds enough water to meet demand in normal years through 2045. Dry-year shortfalls could affect all of Cal Water’s Peninsula customers whether or not the Baylands is built and would be managed through Cal Water’s Water Shortage Contingency Plan. The Baylands’ net increase in drinking-water demand would be offset through Cal Water’s Development Offset Program before service begins.
The WSA required by Senate Bill 610 (Water Code sections 10910–10915) was prepared for Cal Water by EKI Environment & Water (January 2025), approved by Cal Water, and included as FEIR Appendix P (Attachment 3). SB 610 requires a WSA to evaluate water supply and demand over a 20-year planning horizon. The Baylands Water Supply Assessment, prepared in January 2025, uses 2045 as its horizon year because that meets the 20-year requirement and matches the final projection year in Cal Water’s adopted Urban Water Management Plans. It evaluates whether Cal Water would have sufficient supply through 2045 in normal, single dry, and multiple dry years, including for existing customers in Cal Water’s three Peninsula districts (South San Francisco, Mid-Peninsula, and Bear Gulch), which share the same SFPUC supply allocation.1 Its principal findings are:
• Demand. At full buildout, the Specific Plan’s total water demand is estimated at 1,611 AFY. Once the WRF is operating, about 462 AFY of non-potable demand would be met with recycled water, for a net potable demand of about 1,149 AFY (approximately 1.03 million gallons per day (mgd)).2
• Development Offset Program. Under Cal Water’s program (CPUC Advice Letter No. 2453, June 2022), new development that would increase net demand by more than 50 AFY must pay a fee of $15,400 per acre-foot of net demand increase, which funds new supply and conservation programs. The Specific Plan’s estimated offset is 1,146.3 AFY. Cal Water will verify that all offset 1 FEIR, Volume 5, Chapter 14, §14.17, p. 14-121; Volume 3, Section 4.16.6(a) (Impact UTL-1), p. 4.16-38, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 2 Water Supply Assessment, Section 4.5, p. 26 (Attachment 3); FEIR, Volume 3, Table 4.16-2, p. 4.16-7, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
Baylands Specific Plan and EIR – Meeting 7
ATTACHMENT 3
2 payments are complete before establishing a water service connection; the WSA’s findings are contingent on that compliance.3
• Normal years. Supply is sufficient to meet demand in normal years through 2045 under all three scenarios the SFPUC uses to account for uncertainty about the State’s Bay-Delta Plan Amendment.
• Dry years. If the Bay-Delta Plan Amendment is implemented as adopted and additional regional supplies are not developed, the three Peninsula districts project shortfalls of up to 44 percent in a single dry year and up to 53 percent in a multi-year drought by 2045, whether or not the Specific Plan is built. Without the Amendment, the projected shortfall is 15 percent in the fourth and fifth years of a multi-year drought in 2045; under the proposed Voluntary Agreement, cutbacks are assumed not to exceed the SFPUC’s goal of 20 percent system-wide.4 Dry-year shortfalls would be addressed through Cal Water’s Water Shortage Contingency Plan (WSCP), which sets six drought stages ranging from 10 percent to more than 50 percent shortfalls. Customers in the expanded service area, including the Baylands, would be required to comply with those demand-reduction measures. The Bay Area Water Supply and Conservation Agency (BAWSCA), Cal Water, and the SFPUC are also pursuing additional regional supplies. On this basis, the FEIR concludes that the Specific Plan’s water supply impact (Impact UTL-1) is less than significant.5
2. Water Provider, Service Area, and Required Agency Approvals Key Takeaway: Cal Water would replace the City as the water provider for the Baylands, Beatty, and Sierra Point subareas, using SFPUC water and recycled water. Expanding Cal Water’s service area requires approvals from four agencies, none of which may act before the Council certifies the FEIR.
The City’s existing water supply is not adequate to support development of the Baylands.6 Under the plan, Cal Water’s South San Francisco District service area would be expanded to include the Baylands, Beatty, and Sierra Point subareas, which would be removed from the City’s two water service areas (the Brisbane Water District and the Guadalupe Valley Municipal Improvement District (GVMID)). Cal Water would serve these subareas with (1) potable water purchased from the SFPUC, delivered through existing SFPUC turnouts and supplemented by five existing off-site groundwater wells, and (2) recycled water from a water recycling facility (WRF) to be built within the Baylands. The water the City currently supplies to Sierra Point would then become available to the City to support buildout of the General Plan.7
3 Water Supply Assessment, Section 2.4, pp. 15–16 (Attachment 3); FEIR, Volume 3, p. 4.16-40, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 4Water Supply Assessment, Executive Summary, pp. 8–9 (Attachment 3); FEIR, Volume 3, pp. 4.16-40 to 4.16-46, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 5FEIR, Volume 3, pp. 4.16-46 to 4.16-48, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
6Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 7FEIR, Volume 1, Chapter 3 (Project Description), p. 3-71; Volume 3, Section 4.16.4, p. 4.16-34; Volume 4, Response RA-LAFCo-4, p. 13-141; each part of Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
Baylands Specific Plan and EIR – Meeting 7
ATTACHMENT 3
3 Expanding Cal Water’s service area requires approval from other agencies:8 • The California Public Utilities Commission (CPUC) and the SFPUC, for expansion of Cal Water’s service area;
• The San Mateo County Local Agency Formation Commission (LAFCo), only for the change in water service agency for the small southwesterly portion of the Baylands currently within GVMID;
• The Regional Water Quality Control Board and the SFPUC, for a discharge permit for the WRF; and
• The State Water Resources Control Board, Division of Drinking Water, for a water supply permit amendment.
None of these approvals are before the Council tonight, and no agency, including LAFCo, may take discretionary action before the Council certifies the FEIR.9
3. Water Recycling Facility
Key Takeaway: The WRF would treat Baylands wastewater to produce recycled water for non-drinking uses in the Baylands and elsewhere in Cal Water’s South San Francisco District. The Specific Plan requires it to be completed concurrently with Phase I development, but the WSA’s supply findings do not depend on it operating before Phase II.
The WRF is a 1.0 mgd facility proposed east of Tunnel Avenue and would be owned and operated by Cal Water. It would treat approximately 1.73 mgd of Baylands wastewater, drawing on off-site flows if needed, and would produce about 0.95 mgd of recycled water: approximately 0.52 mgd for the Baylands and up to 0.43 mgd for other users in Cal Water's South San Francisco District and the Sierra Point subarea. The remaining 0.05 mgd is waste activated sludge returned to the SFPUC system.10 As described in the FEIR, this arrangement functions as an exchange: in return for Cal Water's provision of potable water to the Baylands, the WRF would supply recycled water to Cal Water's South San Francisco District, which currently has no recycled-water source.11 Recycled water would be used only for non-potable purposes (irrigation, industrial cooling, and non-residential toilet flushing) and conveyed through a separate purple-pipe system.12 The WRF would 8FEIR, Volume 1, Executive Summary, Section ES.4.2, p. ES-147; Volume 4, Responses RA-LAFCo-2 and RA-LAFCo-3, pp. 13-140 to 13-141 (revising the scope of LAFCo approval); each part of Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 9 FEIR, Volume 4, Response RA-LAFCo-7, pp. 13-145 to 13-146, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 10Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report; 2026 Staff-Recommended Specific Plan, Chapter 7, §7.6.2, p. 7-18, Attachment 1 to the September 14, 2026, City Council staff report; FEIR, Volume 3, Section 4.16.4(b), p. 4.16-35, Attachment 2 to the September 14, 2026, City Council staff report (each included in this report as part of Attachment 1). 11FEIR, Volume 4, Response RA-LAFCo-6, p. 13-145; Volume 3, p. 4.16-48; each part of Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 12Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
Baylands Specific Plan and EIR – Meeting 7
ATTACHMENT 3
4 operate on 100 percent renewable fuels, consistent with the Specific Plan's Sustainability Framework.13 1415
Note on recycled water output16The FEIR describes the WRF as treating approximately 1.73 mgd of sewage to generate a maximum of 1.0 mgd of recycled water, with approximately 0.73 mgd discharged to the SFPUC system. Staff’s Specific Plan analysis describes the same facility in more detail: of the 1.0 mgd treated, approximately 0.95 mgd would be recycled water and approximately 0.05 mgd would be waste activated sludge returned to the SFPUC system. The FEIR’s 1.0 mgd figure is a maximum corresponding to the facility’s treatment capacity, and the two descriptions are consistent.17 The Specific Plan requires the WRF, along with the solar field and constructed wetlands, to be completed concurrently with Phase I development, with detailed timing to be set in the Development Agreement. The WRF depends on wastewater flows from occupied development, supplemented by off-site sewage if on-site flows are insufficient; at the September 14 hearing, BDI estimated that operations would begin at about 20 percent of buildout. For planning purposes, the WSA conservatively assumes the WRF will not operate until Phase II and that the Specific Plan’s full demand is met with drinking water until then, so the WSA’s supply findings do not depend on the WRF coming online early. The on-site water system, including storage, pipe designed for ground settlement, and the required landfill waiver, is described in Section 5, below.18
4. Wastewater and Bayshore Sanitary District Coordination Key Takeaway: Wastewater not used for recycling would go to the SFPUC’s Southeast Treatment Plant, within Brisbane’s existing capacity allocation. BSD has stated that the FEIR adequately addresses its concerns, and the Specific Plan reserves street space for a future BSD force main. 13September 14, 2026, City Council staff report, Discussion, Greenhouse Gas Emissions (included in this report as part of Attachment 1).
15FEIR, Volume 2, Section 4.12 (Noise and Vibration), p. 4.12-75; Volume 5, Chapter 14, p. 14-113 (revised MM NOI-2d); each part of Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 17 FEIR, Volume 3, Section 4.16.4(b), p. 4.16-35, Attachment 2 to the September 14, 2026, City Council staff report; Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (each included in this report as part of Attachment 1). 18 2026 Staff-Recommended Specific Plan, Chapter 9, §9.2, p. 9-3, Attachment 1 to the September 14, 2026, City Council staff report; Detailed 2026 Specific Plan Analysis (by chapter), pp. 50 and 53–54, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (each included in this report as part of Attachment 1); City Council hearing record, September 14, 2026 (response by BDI); Water Supply Assessment for the Baylands Specific Plan (EKI Environment & Water, January 2025), Sections 3 and 4.1.7, pp. 18 and 23, FEIR Appendix P (Attachment 3).
Baylands Specific Plan and EIR – Meeting 7
ATTACHMENT 3
5 Wastewater not required for recycling, along with the waste activated sludge, would be routed to the SFPUC system and ultimately to the Southeast Treatment Plant.19 The FEIR concludes that the sludge would not require plant modifications or change the quality of treated water discharged to the Bay. It also concludes that Baylands sewage would remain within Brisbane's 6.0 mgd dry-weather allocation (Impact UTL-2, less than significant).20
To accommodate differential settlement at the interface between proposed structures and sanitary sewer lateral connections, flexible connections with settlement vaults are proposed to avoid shearing of utility infrastructure.21
BSD, which would provide sewage collection, stated in its July 16, 2026, letter that the FEIR adequately addresses its concerns. BSD also noted that the project sponsor must address a BSD parcel on Tunnel Avenue and requested an easement for a future force main. The Specific Plan reserves space within public streets for that force main.22
5. On-Site Water Infrastructure and Phasing
Key Takeaway: The Specific Plan includes a new on-site water system designed to meet fire-flow standards and to withstand ground settlement, including over the closed landfill, where a state waiver is required. Infrastructure is phased and bonded with each increment of development, at the developer’s cost.
The Specific Plan proposes a new potable water distribution system, including approximately 3.16- million-gallon storage capacity; a pump station with an emergency standby generator; a recycled water distribution system; and a new transmission main on Bayshore Boulevard connecting the Baylands to existing SFPUC turnouts, with no new turnouts proposed. Subject to State and Cal Water approval, the water system would use flexible high-density polyethylene (HDPE) pipe to accommodate anticipated soil settlement.23 Because water lines would be constructed on top of the closed landfill, a waiver under California Code of Regulations, Title 22, section 64572(f) is required, and the water system design must include mitigations to support that waiver.24
Delivery criteria and pipe network. Consistent with the California Waterworks Standards (California Code of Regulations, Title 22), the on-site system is designed to deliver the maximum daily demand (1.5 times 192026 Staff-Recommended Specific Plan, Chapter 7, §§7.6.2 and 7.7.2, pp. 7-18 and 7-22, Attachment 1 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 20FEIR, Volume 3, Section 4.16.6(b) (Impact UTL-2), pp. 4.16-51 to 4.16-52, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 21 FEIR, Volume 3, Section 4.16.4(b), p. 4.16-35, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
22Bayshore Sanitary District letter to the Community Development Director re: Final EIR for Brisbane Baylands, July 16, 2026, acknowledged as written correspondence in the July 23, 2026, Planning Commission Meeting Minutes, Attachment 13 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1); 2026 Staff-Recommended Specific Plan, Chapter 7, §7.7.2, p. 7-23, Attachment 1 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
23FEIR, Volume 1, Chapter 3 (Project Description), pp. 3-71 to 3-73, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 242026 Staff-Recommended Specific Plan, Chapter 7, §§7.5.5–7.5.6, p. 7-18, Attachment 1 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
Baylands Specific Plan and EIR – Meeting 7
ATTACHMENT 3
6 average demand) of 1,200 gallons per minute (GPM) across the Baylands, coincident with a 6,000 GPM fire flow at 20 pounds per square inch gauge (psig) residual pressure. The on-site network would consist of a grid of 8-inch-diameter pipes surrounded by 14-inch-diameter loops. To accommodate differential settlement where pile-supported buildings connect to HDPE potable or fire water laterals, flexible connections with settlement vaults, as appropriate based on material specifications, are proposed to prevent shearing of the utility lines.25
Potable water criteria. The Specific Plan requires the potable water system to address the following: a reliable water supply, approved by the City, secured prior to site development; water conservation measures and use of recycled water to reduce potable demand; storage sufficient to deliver 1.5 times average daily demand plus 6,000 GPM fire flow for four hours; flexible distribution piping where post-construction ground settlement is anticipated; and mitigations to support the landfill waiver in the design of the on-site water system.26
Under General Plan Policy BL.1(D) (Measure JJ Topic 3.D), discussed at the October 15, 2026, hearing, each increment of development must be provided with appropriate infrastructure at the developer’s cost.27 At the September 14, 2026, hearing, staff explained that water infrastructure is typically phased through subdivision and public improvement agreements tied to, and bonded for, each increment of development, rather than built all at once.28 The Development Agreement will set detailed timing for infrastructure milestones relative to construction permits and certificates of occupancy.29
6. Responses to Hearing Questions
Council Members and members of the public raised the following water-related questions at the September 14, 2026, hearing. The staff report provides brief responses; full responses and citations are provided below, in the same order.
• Must the full water supply be secured before development? Yes. Measure JJ requires a reliable water supply for the proposed uses to be secured prior to site development, and staff’s June 25, 2026, analysis of the Specific Plan states that construction permits cannot be issued until the City–Cal Water agreements are in place (see Actions Required to Secure the Water Supply in the staff report). Staff stated on September 14 that the supply must be secured for the full range of proposed uses before site development, not piecemeal. This also responds to the water-supply questions raised by the public.
30 25 2026 Staff-Recommended Specific Plan, Chapter 7, §7.5.5, p. 7-18, Attachment 1 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 26 2026 Staff-Recommended Specific Plan, Chapter 7, §7.5.6, p. 7-18, Attachment 1 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 27Detailed 2026 Specific Plan Analysis (by chapter), p. 51, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 28City Council hearing record, September 14, 2026 (staff response). 29October 15, 2026, City Council staff report, Discussion, Phasing (Specific Plan Chapter 9) (Attachment 2 to the October 26, 2026, City Council Memo (included in this report as part of Attachment 2). 30 City Council hearing record, September 14, 2026 (Council and public comment); Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
Baylands Specific Plan and EIR – Meeting 7
ATTACHMENT 3
7 • Can water infrastructure be phased? Yes. Water infrastructure does not all need to be in place before construction permits are issued. It is typically phased through subdivision and public improvement agreements tied to, and bonded for, each increment of development, at the developer’s cost, with detailed timing to be set in the Development Agreement (see Section 5, above).31
• What if Cal Water does not obtain the necessary approvals? Development could not proceed without a secured water supply. No construction permits may be issued until the City and Cal Water have entered into agreements legally establishing the supply, and Cal Water needs approvals from the CPUC and other agencies before it can serve the Baylands (see Section 2, above, and Actions Required to Secure the Water Supply in the staff report).32 • When will the WRF come online? The Specific Plan requires the WRF, along with the solar field and constructed wetlands, to be completed concurrently with Phase I development, with detailed timing to be set in the Development Agreement. Operation depends on wastewater flows from occupied development, supplemented by off-site sewage if on-site flows are insufficient; at the September 14 hearing, BDI estimated that operations would begin at about 20 percent of buildout. The WSA conservatively assumes the WRF will not operate until Phase II, so its supply findings do not depend on an earlier start (see Section 3, above).33 • What if actual use exceeds projections? The WSA’s supply findings are based on the Specific Plan’s projected demand. Under Cal Water’s Development Offset Program, the development’s offset fee is based on its net demand increase, defined as expected total potable water use once the development is completed, minus average existing potable use on the property over the previous five years. Cal Water verifies that offset payments are complete before establishing a water service connection, and the final determination is made at connection based on the program’s requirements at that time. The Specific Plan requires water conservation measures and recycled water use to reduce potable demand. Staff noted on September 14 that the Specific Plan itself does not include a penalty mechanism for future customers’ water use. The terms of Cal Water’s service to the Baylands, including how any demand above projections would be addressed, will be set in the Water Agreement and Main Extension Agreement, which are not yet in place. Separately, during a drought, Baylands customers would be subject to the same demand reductions under Cal Water’s Water Shortage Contingency Plan as all other customers in the service area.34
31City Council hearing record, September 14, 2026 (Council and public comment). 32 City Council hearing record, September 14, 2026 (Council comment); Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report; FEIR, Volume 1, Executive Summary, Section ES.4.2, p. ES-147, Attachment 2 to the September 14, 2026, City Council staff report (each included in this report as part of Attachment 1). 33 City Council hearing record, September 14, 2026 (Council comment; response by BDI); 2026 Staff-Recommended Specific Plan, Chapter 9, §9.2, p. 9-3, Attachment 1 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1); Water Supply Assessment for the Baylands Specific Plan (EKI Environment & Water, January 2025), Sections 3 and 4.1.7, pp. 18 and 23, FEIR Appendix P (Attachment 3). 34 City Council hearing record, September 14, 2026 (public comment); Water Supply Assessment for the Baylands Specific Plan (EKI Environment & Water, January 2025), Section 2.4, pp. 15–16, FEIR Appendix P (Attachment 3); 2026 Staff-Recommended Specific Plan, Chapter 7, §7.5.6, p. 7-18, Attachment 1 to the September 14, 2026, City Council staff report; see also FEIR,
Baylands Specific Plan and EIR – Meeting 7
ATTACHMENT 3
8 • Will Brisbane receive “toilet-to-tap” water? No. The Specific Plan does not propose a potable reuse (“toilet-to-tap”) facility; the WRF would produce recycled water for non-potable uses only, serving the Baylands, Sierra Point, and parts of South San Francisco.35 • WRF size and byproducts? Sizing the WRF to serve both the Baylands and Cal Water’s South San Francisco District is part of the project analyzed in the FEIR, which also addresses discharge of waste activated sludge to the SFPUC system (see Sections 3 and 4, above).36 • Water for dust control during remediation? Under the Specific Plan, water for initial grading and construction, including soil compaction, dust control, and concrete work, would come from the existing Brisbane water system; the estimated need of about 16.6 AFY is within the approximately 21.0 AFY now used by existing Baylands uses that will be removed.37 At the September 14 hearing, it was also noted that temporary sources, such as a hydrant meter or a temporary connection to an existing service, could be used. During a declared shortage, the City’s Water Shortage Contingency Plan calls for recycled water for construction where available (Stage 1) and prohibits potable water for construction and dust control (Stage 2).38 • Water needs under the Environmentally Superior Alternative? The FEIR does not quantify demand for Alternative 7 (Reduced Density, Lower Maximum Building Height), the environmentally superior alternative, but concludes its water supply impacts would be similar: it would use less water but also generate less wastewater for recycling.39 Public comments at the October 6, 2026, hearing also raised general concerns about the reliability of the water supply; those concerns are addressed in Sections 1 through 5, above, and in the staff report’s Discussion.40
Acronyms and Abbreviations
Term Meaning
AFY Acre-feet per year. One acre-foot is about 326,000 gallons, enough to cover one acre one foot deep.
BAWSCA Bay Area Water Supply and Conservation Agency
BDI Baylands Development Inc., the project applicant
BSD Bayshore Sanitary District, which would provide sewage collection Cal Water California Water Service Company, the proposed water provider CEQA California Environmental Quality Act
Volume 3, p. 4.16-47, Attachment 2 to the September 14, 2026, City Council staff report (each included in this report as part of Attachment 1).
35City Council hearing record, September 14, 2026 (public comment). 36City Council hearing record, September 14, 2026 (public comment). 372026 Staff-Recommended Specific Plan, Chapter 7, §7.5.2, p. 7-17, Attachment 1 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 38City Council hearing record, September 14, 2026 (Council comment). FEIR, Volume 3, p. 4.16-34, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 39City Council hearing record, September 14, 2026 (public comment). FEIR, Volume 3, pp. 8-151 and 8-158, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 40 City Council hearing record, October 6, 2026 (public comment).
Baylands Specific Plan and EIR – Meeting 7
ATTACHMENT 3
9 Term Meaning
CPUC California Public Utilities Commission, which regulates private water companies like Cal Water
dBA A-weighted decibels, the standard measure of noise as heard by people EIR / DEIR / FEIR Environmental Impact Report / Draft EIR / Final EIR GPM Gallons per minute
GVMID Guadalupe Valley Municipal Improvement District, one of the City’s two water service areas HDPE High-density polyethylene, a flexible pipe material LAFCo San Mateo County Local Agency Formation Commission mgd Million gallons per day
MM Mitigation Measure (e.g., MM NOI-2d)
psig Pounds per square inch gauge, a measure of water pressure SB 610 Senate Bill 610, the state law requiring Water Supply Assessments for large projects SFPUC San Francisco Public Utilities Commission, the regional water wholesaler WRF Water Recycling Facility
WSA Water Supply Assessment
WSCP Water Shortage Contingency Plan, which sets drought stages and required cutbacks