Cities Index.
Agenda packet

Brisbane City Council
November 9, 2026

Document
Agenda packet
Meeting
November 9, 2026
Body
Brisbane City Council
Pages
632,010,189
Original file
37.3 MB
Text extracted from the city's file for reading and search. Open the original on brisbaneca.api.civicclerk.com. That file is the official record.

-1-
City of Brisbane
City Council Special Meeting Agenda
Monday, November 9, 2026 at 5:30 PM ● Hybrid Meeting ● 50 Park Place, Brisbane, CA The public may observe/participate in City Council meetings using remote public comment options or by attending in person. The City Council may take action on any item listed in the agenda.

To Address the Council
In Person:

Location: Community Meeting Room 50 Park Place, Brisbane, CA 94005 To address the City Council on any item – whether on the posted agenda or not – please fill out a Request to Speak Form located in the Community Meeting Room Lobby and submit it to the City Clerk, preferably before the start of the meeting. Speakers are not required to submit their name or address.

Remote Participation:

Members of the public may observe/participate in the City Council meeting by logging into the Zoom Webinar listed below. City Council meetings may also be viewed live and/or on-demand via the City’s YouTube Channel, youtube.com/brisbaneca, or on Comcast Ch. 27. Archived videos may be replayed on the City’s website, brisbaneca.gov/meetings. Please be advised that if there are technological difficulties, the meeting will nevertheless continue if remote participation is available.

The agenda materials may be viewed online at brisbaneca.gov at least 72 hours prior to a Regular Meeting, and at least 24 hours prior to a Special Meeting.

Remote Public Comments:

Remote meeting participants may address the City Council via Zoom Webinar. Aside from commenting personally while in the Zoom Webinar, you can also use the call in number. The public comments received will be noted for the record during Oral Communications 1 and 2 or during an agenda item. We encourage you to email comments in advance of the meeting to [email protected]. That email address, however, will not be monitored during the meeting and emails received during the meeting will not be responded to or brought to the attention of the City Council during the meeting.

Join Zoom Webinar: zoom.us (please use the latest version: zoom.us/download) brisbaneca.gov/cc-zoom
Webinar ID: 991 9362 8666
Call In Number: 1 (669) 900-9128
Note: Callers dial *9 to “raise hand” and dial *6 to mute/unmute.

Special Assistance:

If you need special assistance to participate in this meeting, please contact the City Clerk at (415) 508- 2113.

Notification in advance of the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting.

Page 1 of 189 ends

November 9, 2026 -2- 5:30 PM
Writings that Are Received After the Agenda Has Been Posted Any writings that are received after the agenda has been posted but before 4pm of the day of the meeting will be available for public inspection at the front lobby in City Hall and on the internet (brisbaneca.gov/meetings).

Any writings that are received after 4pm of the day of the meeting will be distributed to the Council and made available for public inspection at the front lobby and on the internet the day after the meeting (brisbaneca.gov/meetings).

Call to Order – Pledge of Allegiance
Roll Call
A. Remote Attendance Under the Just Cause Provisions of the Brown Act Adoption of Agenda
Continued Public Hearings
B. Consideration of proposed Baylands Specific Plan and related actions, including amendments to the Brisbane General Plan Land Use and Circulation Elements, amendments to TitleSection 17 of the Brisbane Municipal Code to establish zoning regulations, adoption of the Bayshore Mobility Plan, and certification of the Final Environmental Impact Report (FEIR)prepared for this project in accordance with the California Environmental Quality Act (CEQA).

Adjournment

Page 2 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 1 of 10

CITY COUNCIL AGENDA REPORT
Meeting Date: November 9, 2026
From: Kevin Gardiner, Interim Community Development Director Subject: Baylands Subarea; Environmental Review 2021-ER-1, Specific Plan 2021-SP-1, Zoning Amendment 2021-RZ-3, General Plan Amendment 2021-GPA-2; Proposed Baylands Specific Plan including 2,200 residential units; 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses; 500,000 square feet of hotel use (approximately 800 rooms); a grade 6–8 middle school; 157 acres of open space/open area, parks, and trails; water, recycled water, sewer, drainage, electrical, and other utilities improvements on approximately 680.1 acres generally situated easterly of Bayshore Boulevard and west of Highway 101; Related actions include amending the Brisbane General Plan Land Use and Circulation Elements, Amending Title 17 of the Brisbane Municipal Code to establish zoning regulations, and adopting the Bayshore Mobility Plan. A Final Environmental Impact Report (FEIR) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). Baylands Development Inc., applicant; Sunquest Properties, majority owner; see Attachment 1 for a complete list of owners.

Recommendation
Staff recommends that the City Council certify that the Final Environmental Impact Report for the Brisbane Baylands Specific Plan has been prepared in accordance with California Environmental Quality Act (CEQA) Guidelines section 15090 and that the Council approve the project entitlements, which include:
• Amend the General Plan Land Use Element in accordance with Government Code sections 65350 to 65362.
• Amend the General Plan Circulation Element in accordance with Government Code sections 65350 to 65362.
• Adopt the Staff-Recommended Baylands Specific Plan, dated May 2026, with clarifying edits, in accordance with Government Code sections 65450 and 65850 as a zoning ordinance. • Amend Title 17, Zoning, of the Brisbane Municipal Code (BMC) to implement the Baylands Specific Plan for Modified Alternative 1, in accordance with Government Code sections 65800 to 65912.
• Approve the Bayshore Mobility Plan, which will enhance mobility of Brisbane residents along the corridor within the City of Brisbane, consistent with the Brisbane General Plan Circulation Element.

Introduction

Page 3 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 2 of 10 Tonight is the seventh meeting in a series of hearings on the Brisbane Baylands Specific Plan, Final Environmental Impact Report (FEIR), and related approvals that began on September 14, 2026. The hearings are structured around Measure JJ requirements and major project components, enabling a step-by-step review of the materials and of how the project addresses Measure JJ’s requirements. This report also includes a staff clarification on phasing of remediation (see Background).

After concluding the discussion of that began on October 15, 2026, tonight’s topic is Water Infrastructure (Measure JJ Topic 3.B).

Background
Prior hearings in this series (September 14, September 29, October 6, October 15, and October 26, 2026), provide detailed background on the project’s history, Planning Commission review, and prior Council discussion; that material is documented in the respective staff reports and incorporated by reference.1 The Council should refer to those prior staff reports to provide the full analysis and record for the topics addressed at earlier hearings. This report focuses solely on tonight’s topic.

The Baylands’ proposed water source has evolved throughout the planning process. Two earlier options were dropped: a transfer from the Oakdale Irrigation District assumed in the Program EIR, and a 2021 supply and storage arrangement with the Contra Costa Water District at Los Vaqueros Reservoir, which ended when that district withdrew from the reservoir expansion in September 2024. 2 The current proposal, described in the Discussion below, would designate California Water Service Company (Cal Water) as the water provider for the Baylands. Cal Water, the City, Bayshore Sanitary District (BSD), and Baylands Development Inc. (BDI) have signed a non-binding letter of understanding establishing a framework for this arrangement.3
The Planning Commission discussed water-related issues as part of its overall review of the Baylands Specific Plan and FEIR. As noted in the June 25, 2026, agenda report, the Water Agreement between the City and Cal Water – needed to extend Cal Water’s service area to the Baylands – is a Council-level action under Measure JJ and was therefore not subject to Commission recommendation.4 The Commission’s recommendation to the Council did not include a water-specific item.5 The Water Agreement is not before the Council tonight; it will come to the Council for review and approval as a separate action before any site development can occur, and approvals by other agencies will follow FEIR 1 September 14, 2026, City Council Staff Report (Attachment 1); October 26, 2026, City Council Memo (Attachment 2), which includes the October 20, 2026, City Council Memo and the October 15, October 6, and September 29, 2026, City Council Staff Reports as its Attachments 1 through 4. 2
June 25, 2026, Planning Commission Agenda Report, p. 6, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1); FEIR, Volume 3, Section 8.3.3 (Water Supply Alternatives Considered but Rejected), pp. 8-9 to 8-11, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
3 FEIR, Volume 5, Chapter 14, §14.17 (Section 4.16, Utilities, Service Systems, and Water Supply revisions), p. 14-121, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 4 June 25, 2026, Planning Commission Agenda Report, p. 2, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
5 September 14, 2026, City Council staff report, Background, Planning Commission recommendations (included in this report as part of Attachment 1).

Page 4 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 3 of 10 certification. The Council’s consideration of water supply in this hearing series relates to whether the Specific Plan is consistent with Measure JJ Topic 3.B, a finding the Council would make as part of its action on the Specific Plan.

At the September 14, 2026, hearing, Council Members and members of the public raised several water-related questions, and some were deferred to tonight’s hearing. This includes the water-supply question from a member of the public, for which the Council requested a written response. Public comments at the October 6, 2026, hearing also raised general concerns about the reliability of the water supply.

These are addressed in the Discussion below.

Staff Clarification: Phasing of Remediation
The October 15, 2026, staff report indicated that state-approved remediation for OU-SM and OU-2 must be certified complete before construction permits are issued west of Caltrain, and that the Development Agreement would require remediation to be completed before construction activities begin.6 These statements could be read to mean that the entire west side would be remediated before any construction begins, however that is not the case. Before issuing infrastructure or building permits in a district, the City must receive certification from the state regulatory agencies that remediation of that district is complete.7 Per the specific plan and FEIR, remediation is expected to proceed incrementally, and residents and businesses may occupy buildings in areas that have been fully remediated and developed, while remediation and construction continues in others. The FEIR analyzed this condition, including construction emissions and noise affecting new on-site residents while later areas are built.8 Discussion
Water Infrastructure (Measure JJ Topic 3.B)
Water supply is a major component of the Baylands review and a core requirement of Measure JJ. This section begins with a high-level overview of key issues and then summarizes the main findings. Detailed technical analysis supporting these conclusions is provided in Attachment 4 in order to maintain a complete record while keeping the discussion accessible.

State law (Water Code Section 10910) requires a Water Supply Assessment to evaluate water supply and demand over a 20-year planning horizon. The Baylands Water Supply Assessment, prepared in January 2025, uses 2045 as its horizon year because that meets the 20-year requirement and matches the final projection year in Cal Water’s adopted Urban Water Management Plans, which are the source of the assessment’s supply and demand data.

In terms of water supply:
6 October 15, 2026, City Council staff report, Discussion, Land use restrictions and enforcement and Phasing (Specific Plan Chapter 9), Attachment 2 to the October 26, 2026, City Council Memo (included in this report as part of Attachment 2); see also June 25, 2026, Planning Commission Agenda Report, p. 10, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
7 Detailed 2026 Specific Plan Analysis (by chapter), p. 54, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 8 FEIR, Volume 2, Section 4.9 (Air Quality), p. 4.9-89, and Section 4.12 (Noise and Vibration), pp. 4.12-39 and 4.12-58, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).

Page 5 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 4 of 10 • Who would supply the water. California Water Service Company (Cal Water) is proposed to serve the Baylands, Beatty, and Sierra Point subareas instead of the City. It would use water bought from the San Francisco Public Utilities Commission (SFPUC), the regional system that serves most of the Peninsula, and recycled water from a new treatment facility built in the Baylands.
• Is there enough water? In normal years, yes, through 2045. In droughts, all of Cal Water’s Peninsula customers could face significant cutbacks whether or not the Baylands is built.

Baylands residents and businesses would follow the same conservation rules as everyone else. • Recycled water. The new facility would turn Baylands wastewater into recycled water for landscaping, industrial cooling, and toilet flushing in non-residential buildings. It would not produce drinking water.
• What development pays for. New development must pay Cal Water’s offset fee, currently $15,400 per acre-foot of added demand, to fund new supply and conservation, and Cal Water confirms payment before providing service. Under Measure JJ, the infrastructure needed for each phase of development must be provided at the developer’s cost. • When the water must be secured. Under Measure JJ, a reliable water supply must be secured before site development. No construction permits can be issued until the City and Cal Water have binding agreements in place; the City–Cal Water Water Agreement requires its own Council approval.

Measure JJ Topic 3.B corresponds to General Plan Policy BL.1(B), which requires that “a reliable water supply approved by the City of Brisbane to support proposed uses within The Baylands shall be secured prior to site development.”9 The sections that follow summarize the proposed water provider, the adequacy of the water supply, the steps required to secure it, the water recycling facility, phasing and developer responsibilities, and responses to hearing questions, followed by staff’s analysis supporting the Council’s determination under Measure JJ.

Existing uses within the Baylands are served by the City of Brisbane through the Brisbane Water District, one of two water systems operated by the City (the other, the Guadalupe Valley Municipal Improvement District, serves Crocker Park and the Northeast Ridge). The supply is adequate for existing uses, but it cannot accommodate buildout of the Baylands Specific Plan. For that reason, the plan specifies that Cal Water’s South San Francisco District service area would be expanded to include the Baylands, Beatty, and Sierra Point subareas, which would be removed from the City’s water service areas. Cal Water would serve these areas with drinking water purchased from the SFPUC, delivered through existing SFPUC connections (no new connections, or “turnouts,” are proposed), and with recycled water from a water recycling facility (WRF) to be built in the Baylands. The water the City currently supplies to Sierra Point would then become available to other areas of the City not served by Cal Water to support buildout of the General Plan.10
9FEIR, Volume 3, Section 4.16.3 (Regulatory Context), p. 4.16-32, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 10 Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report; FEIR, Volume 1, Chapter 3 (Project Description), pp.

Page 6 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 5 of 10 Expanding Cal Water’s service area also requires approvals from the California Public Utilities Commission (CPUC), the SFPUC, the San Mateo County Local Agency Formation Commission (LAFCo), and state water quality and drinking water regulators. These are listed in the table under Actions Required to Secure the Water Supply, below, and described in Attachment 4. 11 These approvals occur
after FEIR certification; no outside agency may act until the Council completes environmental review. 12 The Water Supply Assessment (WSA), prepared for Cal Water and included as FEIR Appendix P (Attachment 3), evaluates whether Cal Water would have enough water through 2045 in normal, single dry, and multiple dry years, both for the Baylands and for Cal Water’s existing Peninsula customers, who share the same SFPUC supply.

Once recycled water is available, the Baylands at full buildout would need about 1,149 acre-feet per year (AFY) of drinking water. The WSA’s key findings are:
• Normal years. Supply is sufficient to meet demand through 2045. • Dry years. Cal Water’s Peninsula districts could face significant shortfalls by 2045 whether or not the Baylands is built, depending largely on how the State’s Bay-Delta Plan Amendment is implemented and whether new regional supplies are developed. • Drought response. Shortfalls would be managed through Cal Water’s Water Shortage Contingency Plan (WSCP). Baylands customers would be subject to the same drought stages and demand reductions as all other Cal Water customers.

On this basis, the FEIR concludes that the Specific Plan’s water supply impact (Impact UTL-1) is less than significant. Drought‑year scenarios and the Development Offset Program are presented in Attachment 4.
13 The WSA is an analytical document prepared for CEQA review and does not, by itself, commit Cal Water to serve the project. As explained in the FEIR, a binding water service agreement would be executed after CEQA certification, typically following project entitlement and before final map recordation or building permit issuance. For Cal Water, the agreement that formally governs service to new development is a Main Extension Agreement under CPUC Tariff Rule 15. It is generally executed before construction of water facilities and the start of service.14 3-71 to 3-73; Volume 3, Section 4.16.4, p. 4.16-34; each part of Attachment 2 to the September 14, 2026, City Council staff report (each included in this report as part of Attachment 1). See Attachment 4, Section 2, for the full description and agency approvals.
11FEIR, Volume 1, Executive Summary, Section ES.4.2, p. ES-147; Volume 4, Responses RA-LAFCo-2 and RA-LAFCo-3, pp. 13-140 to 13-141 (revising the scope of LAFCo approval); each part of Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 12FEIR, Volume 4, Response RA-LAFCo-7, pp. 13-145 to 13-146, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 13 Water Supply Assessment for the Baylands Specific Plan (EKI Environment & Water, January 2025), Executive Summary and Sections 2.4 and 4.5, FEIR Appendix P (Attachment 3); FEIR, Volume 3, Section 4.16.6(a) (Impact UTL-1), pp. 4.16-38 to 4.16-48, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). See Attachment 4, Section 1, for detailed findings and full citations. 14FEIR, Volume 5, Chapter 14, §14.17, p. 14-121; see also Volume 4, Response M-OSEC-404, pp. 13-492 to 13-493; each part of Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).

Page 7 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 6 of 10 Three items in the record address when that supply must be in place:
• Staff’s June 25, 2026, analysis of the Specific Plan states that no construction permits for projects within the Baylands can be issued until the City and Cal Water have entered into agreements legally establishing the water supply.15
• The June 25, 2026, Planning Commission agenda report identifies the Water Agreement between the City and Cal Water as subject to City Council review and approval prior to site development, per Measure JJ.16
• At the September 14, 2026, hearing, staff stated that City practice treats the first building permit for vertical construction as “site development” for purposes of this requirement, and that while the WSA and a Cal Water will-serve letter exist, a binding water service contract is not yet in place.17
15Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026 Planning Commission Agenda Report, Attachment 4 to the September 14, 2026 City Council staff report (included in this report as part of Attachment 1). 16June 25, 2026, Planning Commission Agenda Report, p. 2, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
17City Council hearing record, September 14, 2026 (staff response).

Page 8 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 7 of 10 The table below summarizes the steps required to secure a water supply for the Baylands.

Step What happens Who decides Status

1. Water Supply
Assessment
Analysis of whether Cal Water has enough supply
through 2045. Required for environmental review;
does not commit Cal Water to serve the project.

Cal Water Completed
(January 2025)

2. Letter of
understanding
Non-binding framework for the arrangement
among Cal Water, the City, BSD, and BDI.

Signing parties Signed

3. FEIR certification and
Specific Plan adoption
Council certifies the environmental review and
decides on the Specific Plan. No other agency may
act on water approvals before this.

City Council Current hearing
series

4. Other agency
approvals
Expanding Cal Water’s service area (CPUC and
SFPUC); changing the water agency for a small
portion of the Baylands (LAFCo); the WRF
discharge permit (Regional Water Quality Control
Board and SFPUC); and the water supply permit
amendment (State Water Resources Control
Board).

Other agencies After FEIR
certification

5. Water Agreement Agreement between the City and Cal Water legally establishing the supply. Required by
Measure JJ before site development.

City Council Future Council
action

6. Main Extension
Agreement
Binding contract under which Cal Water extends
service to new development. Cal Water confirms
offset fees are paid before connecting service.

Cal Water (under
CPUC rules)
Before final map
or construction
permits

7. First building permit The City treats the first building permit as “site development” under Measure JJ. No construction
permits until steps 5 and 6 are in place.

City After steps 5 and
6 8. Phased construction Infrastructure is built and bonded with each increment of development. The WRF must be
completed concurrently with Phase I
development; drinking water serves all uses until
it is operating.

Developer, under
the Development
Agreement
Ongoing through
buildout
The Specific Plan includes a water recycling facility (WRF), to be owned and operated by Cal Water, that would treat Baylands wastewater to produce recycled water for non-potable (non-drinking) uses:
landscape irrigation, industrial cooling, and toilet flushing in non-residential buildings. Recycled water would reduce the Baylands’ demand for drinking water and would also serve Sierra Point and other users in Cal Water’s South San Francisco District, which currently has no recycled-water source. The WRF provides only nonpotable recycled water, delivered through a separate “purple pipe” system.

Wastewater not needed for recycling would go to the SFPUC’s Southeast Treatment Plant; the FEIR finds that this would remain within Brisbane’s existing capacity allocation there (Impact UTL-2, less than significant). Facility sizing, wastewater flows, noise limits, and Bayshore Sanitary District coordination are described in Attachment 4.
18 18 Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report; FEIR, Volume 3, p. 4.16-48 and Section 4.16.6(b) (Impact UTL-2), pp. 4.16-51 to 4.16-52, Attachment 2 to the September 14, 2026, City Council staff report (each included in this report as part of Attachment 1). See Attachment 4, Sections 3 and 4, for detailed analysis and full citations.

Page 9 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 8 of 10 New development that increases water demand must pay into Cal Water’s Development Offset Program, which funds new supply and conservation programs. Cal Water will confirm that offset payments are complete before establishing water service.19 Under General Plan Policy BL.1(D) (Measure JJ Topic 3.D), discussed at the October 15, 2026, hearing, each increment of development must be provided with appropriate infrastructure at the developer’s cost.20 At the September 14, 2026, hearing, staff explained that water infrastructure is typically phased through subdivision and public improvement agreements tied to, and bonded for, each increment of development, rather than built all at once.21 The Development Agreement will set detailed timing for infrastructure milestones relative to construction permits and certificates of occupancy.22 The Specific Plan requires the WRF to be completed concurrently with Phase I development, with detailed timing to be set in the Development Agreement. The WRF depends on wastewater flows from occupied development, supplemented by off-site sewage if on-site flows are insufficient; at the September 14 hearing, BDI estimated that operations would begin at about 20 percent of buildout. For planning purposes, the WSA conservatively assumes the WRF will not operate until Phase II and that the Specific Plan’s full demand is met with drinking water until then, so the WSA’s supply findings do not depend on the WRF coming online early. The on-site water system, including storage, pipe designed for ground settlement, and the required landfill waiver, is described in Attachment 4, Section 5. 23 Responses to Hearing Questions
Council Members and members of the public raised several water-related questions at the September 14, 2026, hearing. Most of these questions are addressed in the sections above. Brief responses are provided below; full responses and citations are provided in Attachment 4, Section 6. • Must the full water supply be secured before development? Yes. Measure JJ requires a reliable water supply for the full range of proposed uses to be secured before site development, not piecemeal, and no construction permits may be issued until the City and Cal Water have entered into agreements legally establishing that supply (see Actions Required to Secure the Water Supply, above).24
• Can water infrastructure be phased? Yes. Infrastructure is phased and bonded with each increment of development, at the developer’s cost.
19 Water Supply Assessment for the Baylands Specific Plan (EKI Environment & Water, January 2025), Section 2.4, pp. 15–16, FEIR Appendix P (Attachment 3); FEIR, Volume 3, p. 4.16-40, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
20Detailed 2026 Specific Plan Analysis (by chapter), p. 51, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 21City Council hearing record, September 14, 2026 (staff response). 22October 15, 2026, City Council staff report, Discussion, Phasing (Specific Plan Chapter 9) (Attachment 2 to the October 26, 2026, City Council Memo (included in this report as part of Attachment 2). 23 2026 Staff-Recommended Specific Plan, Chapter 9, §9.2, p. 9-3, Attachment 1 to the September 14, 2026, City Council staff report; Detailed 2026 Specific Plan Analysis (by chapter), pp. 50 and 53–54, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (each included in this report as part of Attachment 1); City Council hearing record, September 14, 2026; Water Supply Assessment for the Baylands Specific Plan (EKI Environment & Water, January 2025), Sections 3 and 4.1.7, pp. 18 and 23, FEIR Appendix P (Attachment 3). 24 City Council hearing record, September 14, 2026 (Council and public comment); Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026, Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).

Page 10 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 9 of 10 • What if Cal Water does not obtain the necessary approvals? Development could not proceed without a secured water supply.
• When will the WRF come online? The Specific Plan requires it to be completed concurrently with Phase I development. BDI estimated operation would begin at about 20 percent of buildout, and the WSA conservatively assumes it will not operate until Phase II. • What if actual use exceeds projections? The Specific Plan itself has no penalty mechanism for customers’ water use. Service terms will be set in the Water Agreement and Main Extension Agreement.
• Will Brisbane receive “toilet-to-tap” water? No. Recycled water would be used for non-drinking purposes only.
• WRF size and byproducts? Both are analyzed in the FEIR (see Attachment 4, Sections 3 and 4). • Water for dust control during remediation? Construction water would come from the existing Brisbane water system, within the amount now used by existing Baylands uses. • Water needs under the Environmentally Superior Alternative? The FEIR concludes that water supply impacts would be similar to the project’s.

Public comments at the October 6, 2026, hearing also raised general concerns about the reliability of the water supply; those concerns are addressed in the discussion above and in the staff analysis that follow2526
The analysis in this report can support the conclusion that the Specific Plan is consistent with General Plan Policy BL.1(B) (Measure JJ Topic 3.B). The WSA and FEIR identify a water supply for the proposed uses, with dry-year shortfalls managed through Cal Water’s Water Shortage Contingency Plan on the same basis as for all other Cal Water customers. The Specific Plan itself incorporates the requirement that a reliable water supply approved by the City be secured prior to site development, and no construction permits may be issued until the City and Cal Water have entered into agreements legally establishing that supply, with the Water Agreement subject to Council approval.27 Fiscal Impact
Measure JJ requires that Baylands development be revenue positive to the City on an annual basis, where all City costs are exceeded by Project‑generated revenues during all phases of development and upon final buildout (Measure JJ Topic 3.E). The applicant has prepared a fiscal impact analysis for the project, which is currently under peer review by the City’s consultant, Keyser Marston Associates, and will be discussed at a future meeting as the hearing is continued. 26 City Council hearing record, October 6, 2026 (public comment). 27 September 14, 2026, City Council staff report, Discussion, Overview of Measure JJ and General Plan Requirements (included in this report as part of Attachment 1); 2026 Staff-Recommended Specific Plan, Chapter 7, §7.5.6, p. 7-18, Attachment 1 to the September 14, 2026 City Council staff report; Detailed 2026 Specific Plan Analysis (by chapter), p. 50, Attachment 7 to the June 25, 2026 Planning Commission Agenda Report, Attachment 4 to the September 14, 2026, City Council staff report (each included in this report as part of Attachment 1).

Page 11 of 189 ends

Baylands Specific Plan and EIR – Meeting 7 Page 10 of 10 Environmental Impact
A Final Environmental Impact Report (FEIR) (SCH #2006022136) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). The FEIR includes the Draft EIR (DEIR), revisions to the DEIR, comments received on the DEIR, a list of commenters, the City’s responses to significant environmental points raised during the DEIR comment period, and any other information added by the City. Should the Council act to certify the Final EIR, it will need to make Findings and Statements of Overriding Considerations, as well as adopt a Mitigation Monitoring and Reporting Program, consistent with CEQA statutory requirements.

Attachments

1. October 26, 2026, City Council Memo and attachments

2. Water Supply Assessment for the Baylands Specific Plan (EKI Environment & Water, January 2025), FEIR Appendix P (link)

3. Water Supply Technical Analysis
___________________________________ ________________________________ Kevin Gardiner Jeremy Dennis, City Manager
Interim Community Development Director

Page 12 of 189 ends

Baylands Specific Plan and EIR – Meeting 6 Page 1 of 3

CITY COUNCIL MEMO
Meeting Date: October 26, 2026
From: Kevin Gardiner, Interim Community Development Director Subject: Baylands Subarea; Environmental Review 2021-ER-1, Specific Plan 2021-SP-1, Zoning Amendment 2021-RZ-3, General Plan Amendment 2021-GPA-2; Proposed Baylands Specific Plan including 2,200 residential units; 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses; 500,000 square feet of hotel use (approximately 800 rooms); a grade 6–8 middle school; 157 acres of open space/open area, parks, and trails; water, recycled water, sewer, drainage, electrical, and other utilities improvements on approximately 680.1 acres generally situated easterly of Bayshore Boulevard and west of Highway 101; Related actions include amending the Brisbane General Plan Land Use and Circulation Elements, Amending Title 17 of the Brisbane Municipal Code to establish zoning regulations, and adopting the Bayshore Mobility Plan. A Final Environmental Impact Report (FEIR) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). Baylands Development Inc., applicant; Sunquest Properties, majority owner; see Attachment 20 for a complete list of owners.

Recommendation
Staff recommends that the City Council certify that the Final Environmental Impact Report for the Brisbane Baylands Specific Plan has been prepared in accordance with California Environmental Quality Act (CEQA) Guidelines section 15090 and that the Council approve the project entitlements, which include:
• Amend the General Plan Land Use Element in accordance with Government Code sections 65350 to 65362.
• Amend the General Plan Circulation Element in accordance with Government Code sections 65350 to 65362.
• Adopt the Staff-Recommended Baylands Specific Plan, dated May 2026, with clarifying edits, in accordance with Government Code sections 65450 and 65850 as a zoning ordinance. • Amend Title 17, Zoning, of the Brisbane Municipal Code (BMC) to implement the Baylands Specific Plan for Modified Alternative 1, in accordance with Government Code sections 65800 to 65912.
• Approve the Bayshore Mobility Plan, which will enhance mobility of Brisbane residents along the corridor within the City of Brisbane, consistent with the Brisbane General Plan Circulation Element.

Page 3 of 169 ends

Attachment 1
Special Meeting

11.09.26

Page 13 of 189 ends

Baylands Specific Plan and EIR – Meeting 6 Page 2 of 3
Introduction
Tonight is the sixth meeting in the series of meetings for the hearing on the Brisbane Baylands Specific Plan, Final Environmental Impact Report (FEIR), and related approvals that began on September 14, 2026. The Council began its review of Phasing and Remediation (Measure JJ Topics 3.A, 3.C, 3.D, 3.F, and

3.K) on October 15, 2026, and continued that discussion on October 20, 2026. Tonight, the Council will continue its discussion of Phasing and Remediation. No new staff presentation is planned.

Background
On October 15, 2026, the Council concluded its discussion of the Bayshore Mobility Plan and received presentations from staff and the applicant, Baylands Development Inc. (BDI), on phasing and remediation, as described in the October 15, 2026, City Council staff report (Attachment 1). That report is incorporated by reference, and its analysis is not repeated here. Following the presentations, the Council received public comment on the first and second discussion topics, completed its discussion of the first topic, and began its discussion of the second topic. On October 20, 2026, the Council continued the item as described in the October 20, 2026, City Council memo (Attachment 2) and completed its discussion of the second and third topics before continuing the item to tonight’s meeting.

Discussion
Tonight, the Council will resume its discussion with the fourth topic and proceed through the remaining topics, in the order presented in the Discussion section of the October 15, 2026, staff report (Attachment 2):

1. Remediation framework and responsible agencies (discussion completed October 15)

2. Site grading, soil testing, and clean-soil design (discussion completed October 20)

3. Proposed Chapter 9 clarifications: sequencing remediation and development (discussion completed October 20)

4. Land use restrictions and enforcement (discussion resumes tonight)

5. City liability and financial risk

6. Phasing (Specific Plan Chapter 9)

7. Long-Term Remediation Stewardship and Monitoring

8. Planning Commission recommendation: remediation reporting and enforcement Staff and the applicant team will be available to respond to Council questions as each topic is discussed.

Fiscal Impact
Measure JJ requires that Baylands development be revenue positive to the City on an annual basis during all phases of development and upon final buildout (Measure JJ Topic 3.E). The applicant’s fiscal impact analysis is currently under peer review by the City’s consultant, Keyser Marston Associates, and will be discussed as the hearing continues.

Environmental Impact
A Final Environmental Impact Report (FEIR) (SCH #2006022136) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). Should the Council act to certify the

Page 14 of 189 ends

Baylands Specific Plan and EIR – Meeting 6 Page 3 of 3
FEIR, it will need to make Findings and Statements of Overriding Considerations, as well as adopt a Mitigation Monitoring and Reporting Program, consistent with CEQA statutory requirements.

Attachments

1. October 15, 2026, City Council Staff Report

2. October 20, 2026, City Council Memo

3. September 14, 2026, City Council Staff Report

4. Agency Responsibility for Baylands Site Remediation and Landfill Closure ___________________________________ ________________________________ Kevin Gardiner Jeremy Dennis, City Manager
Interim Community Development Director

Page 15 of 189 ends

Baylands Specific Plan and EIR – Meeting 4 Page 1 of 8

CITY COUNCIL AGENDA REPORT
Meeting Date: October 15, 2026
From: Kevin Gardiner, Interim Community Development Director Subject: Baylands Subarea; Environmental Review 2021-ER-1, Specific Plan 2021-SP-1, Zoning Amendment 2021-RZ-3, General Plan Amendment 2021-GPA-2; Proposed Baylands Specific Plan including 2,200 residential units; 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses; 500,000 square feet of hotel use (approximately 800 rooms); a grade 6–8 middle school; 157 acres of open space/open area, parks, and trails; water, recycled water, sewer, drainage, electrical, and other utilities improvements on approximately 680.1 acres generally situated easterly of Bayshore Boulevard and west of Highway 101; Related actions include amending the Brisbane General Plan Land Use and Circulation Elements, Amending Title Section 17 of the Brisbane Municipal Code to establish zoning regulations, and adopting the Bayshore Mobility Plan. A Final Environmental Impact Report (FEIR) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). Baylands Development Inc., applicant; Sunquest Properties, majority owner; see Attachment 1 for a complete list of owners.

Recommendation
Staff recommends that the City Council certify that the Final Environmental Impact Report for the Brisbane Baylands Specific Plan has been prepared in accordance with California Environmental Quality Act (CEQA) Guidelines section 15090 and that the Council approve the project entitlements, which include:
• Amend the General Plan Land Use Element in accordance with Government Code sections 65350 to 65362.
• Amend the General Plan Circulation Element in accordance with Government Code sections 65350 to 65362.
• Adopt the Staff-Recommended Baylands Specific Plan, dated May 2026, with clarifying edits, in accordance with Government Code sections 65450 and 65850 as a zoning ordinance. • Amend Title 17, Zoning, of the Brisbane Municipal Code (BMC) to implement the Baylands Specific Plan for Modified Alternative 1, in accordance with Government Code sections 65800 to 65912.
• Approve the Bayshore Mobility Plan, which will enhance mobility of Brisbane residents along the corridor within the City of Brisbane, consistent with the Brisbane General Plan Circulation Element.

Introduction

Page 3 of 14 ends

ATTACHMENT 1

Page 16 of 189 ends

Baylands Specific Plan and EIR – Meeting 4 Page 2 of 8
Tonight is the fourth meeting in a series of meetings for the hearing on the Brisbane Baylands Specific Plan, Final Environmental Impact Report (FEIR), and related approvals that began on September 14, 2026. The hearings are structured around Measure JJ requirements and major project components, enabling a step-by-step review of the materials and of how the project addresses Measure JJ’s requirements.

After concluding the discussion of the Bayshore Mobility Plan that began on October 6, 2026, tonight’s new topic is Phasing and Remediation (Measure JJ Topics 3.A, 3.C, 3.D, 3.F, and 3.K).

Background
The September 14, September 29, and October 6, 2026, hearings provide detailed background on the project’s history, Planning Commission review, and prior Council discussion; that material is documented in the respective staff reports and incorporated by reference.1 The Council should refer to those reports for the complete analysis and record on the topics discussed at those hearings; staff does not repeat that analysis here. Instead, this report focuses solely on tonight’s topic indicated above.

The Council concluded its discussion of the Land Use Plan (Measure JJ Topics 1, 2, 3.H, and 3.J) and of Design Topics, including the Objective Standards, Design Guidelines, and the Roundhouse (Measure JJ Topic 3.I), on October 6, 2026. It then began its review of Transportation and Transit Topics (Measure JJ Topic 3.D), including street sections, the Plan’s interface with the regional transportation network, and the Geneva Avenue extension. After presentations by staff and the applicant, Baylands Development Inc. (BDI), the Council received public testimony and questions but did not complete its discussion of the Bayshore Mobility Plan. Additional Council discussion and public testimony on the Mobility Plan will continue tonight before the Council begins the topic noted above.

Remediation and phasing were the subject of extensive Planning Commission review, reflecting their central role in Measure JJ.

Between June and August 2026, the Commission received detailed information on the following topics, summarized in the Discussion below:2
• How the 2025–26 plan revisions are reflected in the FEIR; • Site contaminants and approved remediation plans;
• City liability considerations; and
• Long-term remediation monitoring, including comparable projects. 1 September 14, 2026, City Council Staff Report (Attachment 1); October 6, 2026, City Council Staff Report (Attachment 2), which itself includes the September 29, 2026, City Council Staff Report as its own Attachment 2. 2 June 30, 2026, Planning Commission Memorandum (Attachment 7), July 23, 2026, Planning Commission Memorandum (Attachment 6), and August 13, 2026, Planning Commission Memorandum (Attachment 5), each an attachment to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).

Page 4 of 14 ends

ATTACHMENT 1

Page 17 of 189 ends

Baylands Specific Plan and EIR – Meeting 4 Page 3 of 8
In adopting its recommendation, the Commission also recommended that the Council implement staff’s clarifying edits to Specific Plan Chapter 9, and recommended a remediation reporting and enforcement mechanism.
3 Both are discussed below.

Discussion
Phasing and Remediation (Measure JJ Topics 3.A, 3.C, 3.D, 3.F, 3.K) These topics implement General Plan Policy BL.1 by requiring: approved Feasibility Study/Remedial Action Plans (FS/RAPs) and a Title 27 Landfill Closure Plan, with an enforceable schedule and City enforcement mechanism (3.A); residential areas designed and remediated for at-grade uses (3.C); developer-funded infrastructure and amenities (3.D); sufficient assurances for ongoing remediation and development performance, such as bonds, insurance, and monitoring (3.F); and soil testing before any export or grading-related relocation of landfill soil (3.K).

The discussion below moves from the approved remediation plans, to how remediation is sequenced with City permitting and the City’s resulting role, to development phasing and long-term monitoring.

Remediation framework and responsible agencies
Three regulatory sites underlie the Baylands (see attachment 4):
• The former Brisbane Landfill (eastern portion of the site); • The San Mateo County portion of the Operable Unit (OU-SM), north of Geneva Avenue; and • Operable Unit OU-2, south of Geneva Avenue.

Remediation of each site is the responsibility of the property owner, under the oversight of the Regional Water Quality Control Board (RWQCB) and/or the Department of Toxic Substances Control (DTSC) (together, “the regulating agencies”). Additionally, San Mateo County Environmental Health Services (SMC Health) will coordinate with the regulating agencies and oversees local enforcement, post-closure building registrations, and gas mitigation/monitoring compliance for the former Brisbane Landfill; SMC Health is a local Enforcement Agency (LEA) that ensures strict compliance with the approved Title 27 Closure Plan and Post-Closure Maintenance Plan.

Remediation is not itself a component of the Specific Plan or the FEIR; although those documents acknowledge the necessity of site cleanup, they do not prescribe remediation methods, establish technical requirements, or govern the cleanup process. Instead, remediation is conducted independently pursuant to the direction and authority of the regulating agencies, and both the General Plan and Measure JJ require that all necessary remediation be completed prior to initiation of any Baylands development.

The FS/RAPs for OU-SM and OU-2 (prepared by Geosyntec, October 11 and December 22, 2021, respectively) were approved by the regulatory agencies on October 5, 2021, and December 17, 2021, respectively. The Title 27 Landfill Closure Plan (prepared by Engeo, December 8, 2021, and revised March 25, 2022) was approved by SMC Health on January 16, 2025, and by the RWQCB on February 28, 3 September 14, 2026, City Council staff report, Background, Planning Commission recommendations on Remediation and Implementation (included in this report as part of Attachment 1).

Page 5 of 14 ends

ATTACHMENT 1

Page 18 of 189 ends

Baylands Specific Plan and EIR – Meeting 4 Page 4 of 8
2025, with closure required within ten years of that approval. 4 Remedial Design Implementation Plans
(RDIPs), which will contain updated remediation schedules and the soil testing/management plan required by Measure JJ Topic 3.K, have been prepared and submitted for regulating agency review and approval.

Extensive multi-year soil, soil vapor, and groundwater sampling at OU-SM and OU-2 identified metals, including mercury, above applicable screening levels in localized areas, consistent with the site’s history of rail and industrial use, including a former railroad switching yard at OU-2 (1907–1982). 5 The approved
FS/RAPs specify a consistent remediation approach for both operable units: soil capping (a minimum five-foot clean-soil cap or hardscape), localized excavation and relocation of soil that cannot be capped in place, vapor and groundwater confirmation sampling, and long-term land use restrictions (described below).
6 Implementation details, including specific excavation, stockpiling, dust control, and stormwater management procedures, will be defined in the RDIPs.

The FEIR’s hazards analysis (Impact HAZ-3, Development on a Hazardous Materials Site) concludes that impacts are less than significant because Baylands development will not commence until after the approved remediation and landfill closure activities are completed, reducing the potential for worker, public, or environmental exposure to hazardous materials during development. 7 Site grading, soil testing, and clean-soil design
Specific Plan Chapter 7 describes the sitewide grading strategy: approximately 2.5 million cubic yards of soil atop the former landfill will be moved from east of the Caltrain right-of-way to the west to establish finished elevations, comply with the remediation and landfill closure plans, and address settlement, flooding, and sea level rise.
8 In addition to this westward movement of soil from the landfill, approximately 1.8 million cubic yards of soil will be temporarily relocated within the eastern portion of the site to allow installation of the landfill cap. Once the cap is installed, the soil will be placed back over the cap as engineered fill to support development in the Campus East District. 9 Consistent with Measure JJ Topic 3.K, most of this soil will be reused on-site, and a soil testing plan for soil relocated from the landfill area has been incorporated into the RDIPs. In addition, the Specific Plan requires that soil be tested in a manner approved by the City before any grading permit is issued for its export or incorporation into a remediation or grading plan, directly aligning with the RDIP testing approach. Testing has already been completed for the soil atop the former landfill that will move west, 4 2026 Staff-Recommended Specific Plan, Table 1.4.1, pp. 1-11 to 1-14, Attachment 1 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 5 UPC OU-SM Feasibility Study/Remedial Action Plan, Geosyntec, October 11, 2021, §3.1 (Soil); OU-2 Feasibility Study/Remedial Action Plan, Geosyntec, December 22, 2021, §3.1 (Soil) (Attachment 3). 6 UPC OU-SM Feasibility Study/Remedial Action Plan, Geosyntec, October 11, 2021, §7 (Preferred Remedial Alternative); OU-2 Feasibility Study/Remedial Action Plan, Geosyntec, December 22, 2021, §6.3.3 (Attachment 3). 7 FEIR, Volume 1, Impact HAZ-3, p. 8-790, Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
8 2026 Staff-Recommended Specific Plan, Chapter 7, §§7.3.1–7.3.2, Attachment 1 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 9 FEIR, Volume 5, Chapter 14, §14.16 (Section 4.14, Hydrology and Water Quality revisions), Attachment 2 to the September 14, 2026 City Council staff report (included in this report as part of Attachment 1).

Page 6 of 14 ends

ATTACHMENT 1

Page 19 of 189 ends

Baylands Specific Plan and EIR – Meeting 4 Page 5 of 8
and any additional on-site or imported soil material will be sampled in accordance with both the Specific Plan and RDIP requirements to confirm its suitability for use within the Baylands.

FEIR Mitigation Measure MM HAZ-1b also requires a Soil and Groundwater Management Plan, prepared by a qualified consultant, subject to City staff and/or City-contracted peer review, and approved by the regulating agencies, before any building or grading permit is issued. Draft versions of these plans are included in the RDIPs and they incorporate worker-safety protocols, groundwater management procedures, and cap-integrity protections. The developer bears all costs associated with preparing these plans, including any City-contracted peer review.
10 Proposed Chapter 9 clarifications: sequencing remediation and development The approved FS/RAPs and the Title 27 landfill closure plan establish what remediation must occur; the proposed Chapter 9 clarifications would establish when confirmation of that remediation is required relative to each City approval. Staff proposed revisions to Specific Plan Sections 9.2 (Phasing) and 9.3 (Subsequent City Approval Processes), presented to the Planning Commission on July 23, 2026, that distinguish remediation activities from development activities and specify the responsible party and oversight for each.
11 The Planning Commission recommended that the Council implement these clarifications. The framework is:
• Pre-Development Remediation: The owner/developer relocates soil, installs the cap, and tests soil and air under regulating agency oversight. The City may approve planning entitlements during this period.
• Site Preparation: The owner/developer completes any additional testing that may be required by the regulatory agencies; the City issues grading permits and approves infrastructure plans only after regulating agency confirmation.
• Building Construction: The same confirmation requirement applies before the City issues building and occupancy permits.
• Monitoring and Reporting: The owner/developer conducts ongoing soil and air testing, as required by the regulating agency; the City receives annual reporting tied to FEIR mitigation measures, the Development Agreement, and conditions of approval.

This sequencing is intended to ensure that remediation is confirmed before each City approval, while maintaining clear boundaries between regulating agency authority and City permitting.

Land use restrictions and enforcement
Land use restrictions in remediated areas include:
• Prohibitions on disturbing landfill or operable-unit caps without regulatory approval; 10 FEIR, Volume 5, Chapter 14, §14.15 (revised MM HAZ-1b, Section 4.13, Hazards and Hazardous Materials), Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 11 Hazardous Materials Remediation, Monitoring, and Oversight (ESA, July 16, 2026), Attachment 7 to the July 23, 2026, Planning Commission Memorandum, Attachment 6 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).

Page 7 of 14 ends

ATTACHMENT 1

Page 10 of 169 ends

Baylands Specific Plan and EIR – Meeting 4 Page 6 of 8
• Installation and operation of vapor intrusion mitigation systems in buildings that overly areas where soil-vapor concentrations exceed cleanup levels;
• Restrictions on groundwater extraction or use; and
• Prohibitions on growing produce except in raised beds.

These restrictions are administered by the regulating agencies rather than the City. On enforcement (Measure JJ Topics 3.A(iii) and 3.F), the Specific Plan and approved RAPs identify regulatory orders, including financial assurance requirements, that the regulating agencies will use as legally binding mechanisms to compel BDI’s adherence to closure and remediation schedules. Separately, the Development Agreement will include City compliance-enforcement provisions and will require remediation to be completed before construction activities begin. 12 City liability and financial risk
Under this framework, the City’s role at each stage is to condition its own approvals on the regulating agencies’ confirmations, rather than to direct or verify remediation itself. In response to the Planning Commission’s liability question, the June 30 and August 13, 2026, memoranda13 advise that the City avoid independent testing or monitoring that could impute legal responsibility for remediation, since City-mandated testing conducted independently of the regulating agencies could expose the City to liability for errors or omissions, or for hazards exacerbated by City-imposed requirements. Staff recommends that the City instead rely on regulating agency oversight, combined with a private long-term stewardship structure and public transparency in reporting (see Long‑Term Remediation Stewardship and Monitoring, below).

Phasing (Specific Plan Chapter 9)
Development phasing follows the same remediation-first sequence. Chapter 9 identifies two general development phases, consistent with the phasing analyzed in the FEIR:
14 • Phase I (West Side): Bayshore, Roundhouse, and Icehouse Hill Districts; internal roadways; the Geneva Avenue Bridge crossing; major west-side parks; Icehouse Hill restoration; and the east-side infrastructure needed sitewide (solar field, water recycling facility, and constructed wetlands). • Phase II (East Side): Sustainability District (whose construction overlaps with Phase I) and Campus East District; the Bay Trail; Visitacion Creek and Lagoon Park open space; and the Tunnel Avenue/Lagoon Road/Sierra Point Parkway roadway improvements. Phase II proceeds only after the stockpiled soil is relocated off the former landfill and Title 27 closure activities are completed there.

State-approved remediation for OU-SM and OU-2 must be certified complete before construction permits are issued west of Caltrain, and each block east of Caltrain must receive Title 27 closure 12 The Development Agreement is tentatively scheduled for further discussion at the October 26, 2026, hearing; see the Revised Schedule (included in this report as part of Attachment 2). 13 June 30, 2026, Planning Commission Memorandum, Attachment 7, and August 13, 2026, Planning Commission Memorandum, Attachment 5, to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
14 2026 Staff-Recommended Specific Plan, Chapter 9, §9.2 and Table 9.2.1 (Phases and Districts), Attachment 1 to the September 14, 2026 City Council staff report (included in this report as part of Attachment 1).

Page 8 of 14 ends

ATTACHMENT 1

Page 11 of 169 ends

Baylands Specific Plan and EIR – Meeting 4 Page 7 of 8
certification before infrastructure or building permits are issued there. The Development Agreement will set detailed timing for open space, infrastructure, roadway, remediation, and landfill-closure milestones relative to building permits and certificates of occupancy. The Development Allocation Process (Section

9.3.2), subject to Planning Commission review and approval, will govern block-level allocation of dwelling units and commercial square footage over the approximately 20-year buildout, so that development in one part of a district does not prematurely consume the district’s capacity. 15 Long‑Term Remediation Stewardship and Monitoring
Remediation obligations continue after development, consistent with Measure JJ Topic 3.F. Once remediation is complete, the regulating agencies will require BDI (or any successor) to enter into an Operation and Maintenance (O&M) Agreement and post financial assurances for long-term monitoring, inspection, and reporting, with the City among the reviewing agencies for the RDIPs, Landfill Closure Plan, and O&M Agreement. Anticipated post-construction monitoring and inspection procedures under the approved FS/RAPs, RDIPs, and Landfill Closure Plan are summarized in a table prepared by EKI and provided to the Commission on August 13, 2026.
16 At the July 23, 2026, meeting, staff provided information on the Schlage Lock site in San Francisco as a comparable remediation project, and on Site-Specific Environmental Management Area (SSEMA) structures, under which a private entity serves as operator, compliance coordinator, and steward for a remediated site, paired with public transparency in reporting. 17 This is the long-term stewardship
structure referenced above in connection with City liability. The FEIR also notes that remediation of the existing chlorinated volatile organic compound (CVOC) groundwater plume within the Baylands is being coordinated with the Schlage Operating Unit, which has undergone its own environmental review and been approved by DTSC.
18 Planning Commission recommendation: remediation reporting and enforcement The Commission recommended that all reports submitted to DTSC and RWQCB be concurrently submitted to the City and made publicly available, with the City withholding or ceasing to process permits if reports are not current at the time of permit issuance, inspection, or occupancy. Post-occupancy, the same reporting expectations would apply, with lapses addressed through existing City mechanisms, including discretionary permit revocation where applicable, or code enforcement. 19 Staff
15 2026 Staff-Recommended Specific Plan, Chapter 9, §9.3.2 (Development Allocation Process), Attachment 1 to the September 14, 2026 City Council staff report (included in this report as part of Attachment 1). 16 EKI remediation monitoring table, Attachment 6 to the August 13, 2026, Planning Commission Memorandum, Attachment 5 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 17 July 23, 2026 Planning Commission Memorandum, its Attachments 5 (Schlage Lock supplemental information) and 6 (SSEMA information), Attachment 6 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1).
18 FEIR, Volume 5, Chapter 14, §14.15 (Section 4.13, Hazards and Hazardous Materials revisions), Attachment 2 to the September 14, 2026, City Council staff report (included in this report as part of Attachment 1). 19 September 14, 2026, City Council staff report, Background, Planning Commission recommendation on Remediation (included in this report as part of Attachment 1).

Page 9 of 14 ends

ATTACHMENT 1

Page 12 of 169 ends

Baylands Specific Plan and EIR – Meeting 4 Page 8 of 8
supports this recommendation, as the issuance of permits, inspection, or occupancy would allow enforcement.

Fiscal Impact
Measure JJ requires that Baylands development be revenue positive to the City on an annual basis, where all City costs are exceeded by Project-generated revenues during all phases of development and upon final buildout (Measure JJ Topic 3.E). The applicant has prepared a fiscal impact analysis for the project, which is currently under peer review by the City’s consultant, Keyser Marston Associates, and will be discussed at a future meeting as the hearing is continued.

Environmental Impact
A Final Environmental Impact Report (FEIR) (SCH #2006022136) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). The FEIR includes the Draft EIR (DEIR), revisions to the DEIR, comments received on the DEIR, a list of commenters, the City’s responses to significant environmental points raised during the DEIR comment period, and any other information added by the City. Should the Council act to certify the Final EIR, it will need to make Findings and Statements of Overriding Considerations, as well as adopt a Mitigation Monitoring and Reporting Program, consistent with CEQA statutory requirements.

Attachments

1. September 14, 2026, City Council Staff Report and its attachments

2. October 6, 2026, City Council Staff Report and its attachments

3. Remedial Action Plans for OU-SM and OU-2 (Geosyntec, October 11 and December 22, 2021, respectively) and Title 27 Landfill Closure Plan (approved February 2025) (links)

4. Agency Responsibility for Baylands Site Remediation and Landfill Closure ___________________________________ ________________________________ Kevin Gardiner Jeremy Dennis, City Manager
Interim Community Development Director

Page 10 of 14 ends

ATTACHMENT 1

Page 13 of 169 ends

Baylands Specific Plan and EIR - Meeting 4
ATTACHMENT 1
Attachment 1: September 14, 2026 City Council Agenda Report September 14, 2026 City Council Agenda Report
https://brisbaneca.portal.civicclerk.com/event/6965/files/report/3249 1

Page 11 of 14 ends

ATTACHMENT 1

Page 14 of 169 ends

Baylands Specific Plan and EIR - Meeting 4
ATTACHMENT 2
Attachment 2: October 6, 2026 City Council Agenda Report October 6, 2026 City Council Agenda Report
https://brisbaneca.portal.civicclerk.com/event/7009/files/report/3287 1

Page 12 of 14 ends

ATTACHMENT 1

Page 15 of 169 ends

Baylands Specific Plan and EIR - Meeting 4
ATTACHMENT 3
Attachment 3: Remedial Action Plans for OU-SM and OU-2 and Title 27 Landfill Closure Plan
i. Appendix K1 - OU-SM RAP (4 parts)
• Appendix K1 - OU-SM RAP 1 of 4 (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2953/Appendix-K1---OU-SM-RAP-1-of-4-PDF • Appendix K1 - OU-SM RAP 2 of 4 (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2966/Appendix-K1---OU-SM-RAP-2-of-4-PDF • Appendix K1 - OU-SM RAP 3 of 4 (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2963/Appendix-K1---OU-SM-RAP-3-of-4-PDF • Appendix K1 - OU-SM RAP 4 of 4 (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2946/Appendix-K1---OU-SM-RAP-4-of-4-PDF ii. Appendix K2 - OU-2 RAP (5 parts)
• Appendix K2 - OU-2 RAP 1 of 5 (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2956/Appendix-K2---OU-2-RAP-1-of-5-PDF • Appendix K2 - OU-2 RAP 2 of 5 (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2965/Appendix-K2---OU-2-RAP-2-of-5-PDF • Appendix K2 - OU-2 RAP 3 of 5 (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2959/Appendix-K2---OU-2-RAP-3-of-5-PDF • Appendix K2 - OU-2 RAP 4 of 5 (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2948/Appendix-K2---OU-2-RAP-4-of-5-PDF • Appendix K2 - OU-2 RAP 5 of 5 (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2938/Appendix-K2---OU-2-RAP-5-of-5-PDF iii. Appendix K3 - Former Brisbane Landfill Closure Plan and Post Closure Maintenance Plan (PDF)
https://www.brisbaneca.gov/DocumentCenter/View/2961/Appendix-K3---Former-Brisbane-Landfill-Closure-Plan-and-Post-Closure-Maintenance-Plan-PDF 1

Page 13 of 14 ends

ATTACHMENT 1

Page 16 of 169 ends

ATTACHMENT 1
Baylands Specific Plan and EIR - Meeting 4
ATTACHMENT 4
Attachment 4: Agency Responsibility for Baylands Site Remediation and Landfill Closure

Page 14 of 14 ends
Page 17 of 169 ends

101

UPC OU-SM
(DTSC)
OU-2
(RWQCB)
San
Brisbane Landfill
Francisco
(RWQCB)
Bay
shore Biva
Tunnel Ave
Brisbane
Lagoon
Pagge2746f189
Baylands Specific Plan and EIR – Meeting 5 Page 1 of 2

CITY COUNCIL MEMO
Meeting Date: October 20, 2026
From: Kevin Gardiner, Interim Community Development Director Subject: Baylands Subarea; Environmental Review 2021-ER-1, Specific Plan 2021-SP-1, Zoning Amendment 2021-RZ-3, General Plan Amendment 2021-GPA-2; Proposed Baylands Specific Plan including 2,200 residential units; 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses; 500,000 square feet of hotel use (approximately 800 rooms); a grade 6–8 middle school; 157 acres of open space/open area, parks, and trails; water, recycled water, sewer, drainage, electrical, and other utilities improvements on approximately 680.1 acres generally situated easterly of Bayshore Boulevard and west of Highway 101; Related actions include amending the Brisbane General Plan Land Use and Circulation Elements, Amending Title 17 of the Brisbane Municipal Code to establish zoning regulations, and adopting the Bayshore Mobility Plan. A Final Environmental Impact Report (FEIR) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA).

Baylands Development Inc., applicant; Sunquest Properties, majority owner; see Attachment 1 to the September 14, 2026, staff report for a complete list of owners.

Recommendation
Staff recommends that the City Council certify that the Final Environmental Impact Report for the Brisbane Baylands Specific Plan has been prepared in accordance with California Environmental Quality Act (CEQA) Guidelines section 15090 and that the Council approve the project entitlements, which include:
• Amend the General Plan Land Use Element in accordance with Government Code sections 65350 to 65362.
• Amend the General Plan Circulation Element in accordance with Government Code sections 65350 to 65362.
• Adopt the Staff-Recommended Baylands Specific Plan, dated May 2026, with clarifying edits, in accordance with Government Code sections 65450 and 65850 as a zoning ordinance. • Amend Title 17, Zoning, of the Brisbane Municipal Code (BMC) to implement the Baylands Specific Plan for Modified Alternative 1, in accordance with Government Code sections 65800 to 65912. • Approve the Bayshore Mobility Plan, which will enhance mobility of Brisbane residents along the corridor within the City of Brisbane, consistent with the Brisbane General Plan Circulation Element.

Introduction
Tonight is the fifth meeting in the series of meetings for the hearing on the Brisbane Baylands Specific Plan, Final Environmental Impact Report (FEIR), and related approvals that began on September 14, 2026. At its October 15, 2026, meeting, the Council concluded its discussion of the Bayshore Mobility Plan and began its

Page 3 of 5 ends

ATTACHMENT 2

Page 18 of 169 ends

Baylands Specific Plan and EIR – Meeting 5 Page 2 of 2
review of Phasing and Remediation (Measure JJ Topics 3.A, 3.C, 3.D, 3.F, and 3.K). Tonight, the Council will continue its discussion of Phasing and Remediation. No new staff presentation is planned.

Background
On October 15, 2026, the Council received presentations from staff and the applicant, Baylands Development Inc. (BDI), on phasing and remediation, as described in the October 15, 2026, City Council staff report (Attachment 1). That report is incorporated by reference, and its analysis is not repeated here.

Following the presentations, the Council received public comment on the first and second discussion topics, completed its discussion of the first topic, and began its discussion of the second topic before continuing the topic to tonight’s meeting.

Discussion
Tonight, the Council will resume with the second topic and continue through the remaining topics in the order provided in the October 15, 2026, staff report (Attachment 1):

1. Remediation framework and responsible agencies (discussion completed October 15)

2. Site grading, soil testing, and clean-soil design (discussion begun October 15; resumes tonight)

3. Proposed Chapter 9 clarifications: sequencing remediation and development

4. Land use restrictions and enforcement

5. City liability and financial risk

6. Phasing (Specific Plan Chapter 9)

7. Long-Term Remediation Stewardship and Monitoring

8. Planning Commission recommendation: remediation reporting and enforcement Fiscal Impact
Measure JJ requires that Baylands development be revenue positive to the City on an annual basis during all phases of development and upon final buildout (Measure JJ Topic 3.E). The applicant’s fiscal impact analysis is currently under peer review by the City’s consultant, Keyser Marston Associates, and will be discussed at a future meeting as the hearing is continued.

Environmental Impact
A Final Environmental Impact Report (FEIR) (SCH #2006022136) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). Should the Council act to certify the FEIR, it will need to make Findings and Statements of Overriding Considerations, as well as adopt a Mitigation Monitoring and Reporting Program, consistent with CEQA statutory requirements.

Attachments

1. October 15, 2026, City Council Staff Report and its attachments ___________________________________ ________________________________ Kevin Gardiner Jeremy Dennis, City Manager
Interim Community Development Director

Page 4 of 5 ends

ATTACHMENT 2

Page 19 of 169 ends

Baylands Specific Plan and EIR - Meeting 5
ATTACHMENT 1
Attachment 1: October 15, 2026 City Council Agenda Report October 15, 2026 City Council Agenda Report
https://brisbaneca.portal.civicclerk.com/event/6997/files/report/3289 1

Page 5 of 5 ends

ATTACHMENT 2

Page 20 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 1 of 11

CITY COUNCIL AGENDA REPORT
Meeting Date: September 14, 2026
From: Julia Ayres, Community Development Director
Subject: Baylands Subarea; Environmental Review 2021-ER-1, Specific Plan 2021-SP-1, Zoning Amendment 2021-RZ-3, General Plan Amendment 2021-GPA-2; Proposed Baylands Specific Plan including 2,200 residential units; 6.5 million square feet of commercial, office, retail, conference, life science, and office campus uses; 500,000 square feet of hotel use (approximately 800 rooms); a grade 6–8 middle school; 157 acres of open space/open area, parks, and trails; water, recycled water, sewer, drainage, electrical, and other utilities improvements on approximately 680.1 acres generally situated easterly of Bayshore Boulevard and west of Highway 101; Related actions include amending the Brisbane General Plan Land Use and Circulation Elements, Amending Title Section 17 of the Brisbane Municipal Code to establish zoning regulations, and adopting the Bayshore Mobility Plan. A Final Environmental Impact Report (FEIR) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). Baylands Development Inc., applicant; Sunquest Properties, majority owner; see Attachment 3 for a complete list of owners.

Recommendation
Staff recommends that the City Council certify that the Final Environmental Impact Report for the Brisbane Baylands Specific Plan has been prepared in accordance with Environmental Quality Act (CEQA) Guidelines section 15090 and that the Council approve the project entitlements, which include:
• Amend the General Plan Land Use Element in accordance with Government Code sections 65350 to 65362.
• Amend the General Plan Circulation Element in accordance with Government Code sections 65350 to 65362.
• Adopt the Staff-Recommended Baylands Specific Plan, dated May 2026, with clarifying edits, in accordance with Government Code sections 65450 and 65850 as a zoning ordinance. • Amend Title 17, Zoning, of the Brisbane Municipal Code (BMC) to implement the Baylands Specific Plan for Modified Alternative 1, in accordance with Government Code sections 65800 to 65912.
• Approve the Bayshore Mobility Plan, which will enhance mobility of Brisbane residents along the corridor within the City of Brisbane, consistent with the Brisbane General Plan Circulation Element.

Introduction

Page 3 of 151 ends

Attachment 3

Page 21 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 2 of 11
As one of Brisbane’s largest and most prominent potential development sites, the Baylands has raised significant questions related to environmental conditions, safety, land use, and the overall impact on the community. To analyze and balance these issues, the City has undertaken comprehensive planning effort for the subarea over the past two decades involving public workshops and planning charettes, community surveys, Planning Commission and City Council hearings regarding General Plan amendments and associated environmental review, and a successful ballot measure (Measure JJ) authorizing Bayland development subject to specified conditions, including the preparation and adoption of a Specific Plan to guide development throughout the subarea.

Tonight is the first City Council public hearing regarding the Brisbane Baylands Specific Plan, Final Environmental Impact Report (FEIR), and related approvals. The Council will consider the project materials through a structured series of hearings organized around Measure JJ requirements and the major components of the Baylands Specific Plan and FEIR. This approach allows both the Council and the public to review the material in manageable segments while tracking how the project is consistent with Measure JJ’s various requirements.

Tonight's topics include discussions of:
• Measure JJ and the General Plan requirements that govern the Baylands Specific Plan; • The Specific Plan’s sustainability program and designing for ongoing energy neutrality(Measure JJ Topic 3.G); and
• Air quality and greenhouse gas (GHG) impacts and associated mitigation measures identified in the EIR.

Background
The applicant, Baylands Development Inc. (BDI), submitted a revised Specific Plan in 2025, which was analyzed in the 2025 Draft EIR (published April 3, 2025; 151-day public comment period concluding September 2, 2025). Following the close of the comment period, City staff and its environmental and planning consultants (Environmental Science Associates, or ESA; Fehr & Peers; and others) prepared the 2026 Staff-Recommended Specific Plan () and the Final EIR (), both published May 14, 2026. The Draft EIR’s analysis and mitigation measures were prepared in response to the 2025 Specific Plan; the Final EIR analyzes the 2026 Specific Plan recommended for approval as “Modified Alternative 1.” The Final EIR’s analysis demonstrates that the 2026 Staff-Recommended Specific Plan would not have new or more severe environmental effects than the 2025 Specific Plan analyzed in the Draft EIR, and many of the 2026 Specific Plan’s features result in superior environmental outcomes compared with the Draft EIR.

Following City Council approval, the Mitigation Monitoring and Reporting Program included in the Final EIR would apply to the Specific Plan in its final form.

The 2026 Staff-Recommended Specific Plan and Final EIR are described and discussed in detail in the June 25, 2026 Planning Commission staff report ().

The Planning Commission's review of the project proceeded as follows (full detail and attachments for each Commission meeting are included in Attachment 4-9):
• May 28, 2026 — Workshop 1 of 2: Specific Plan overview, chapter-by-chapter summary, and key changes recommended by staff to the applicant's 2025 plan. • June 11, 2026 — Workshop 2 of 2: FEIR overview, CEQA process, and the Bayshore Mobility Plan (BMP).

Page 4 of 151 ends

Attachment 3

Page 22 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 3 of 11
• June 25, 2026 — Public hearing opened; staff presentation, public testimony; Commission requested follow-up information on five topics, including the relationship between the 2025/2026 plan revisions and the FEIR, remediation, City liability, GHG analysis, and Measure JJ sustainability/energy-neutrality consistency.
• June 30, 2026 — Continued hearing; staff responses to the five topics above; hearing continued. • July 23, 2026 — Continued hearing; additional staff responses (BMP integration, net-zero project examples, Schlage Lock site remediation comparison, site environmental management associations); staff-recommended clarifications to Specific Plan Chapter 3 (density/intensity averaging, hospitality use table) and Chapter 9 (remediation-related permitting); public hearing closed; Commission deliberated and adopted Planning Commission Resolution PC-01-26 () recommending City Council approval of the Bayshore Mobility Plan with two modifications (limiting BMP improvements to those needed to implement Mitigation Measures TRA-2a, 3f, 3i, and 3n, and excluding the four-to-two lane “road diet” pending further engineering study), continuing final deliberations.
• August 13, 2026 — Continued deliberations on mobility/neighborhood design, sustainability and energy, remediation monitoring and City liability, and land use/municipal code alignment (biosafety level thresholds, Dark Sky Ordinance); Commission finalized its recommendation to the City Council on the Specific Plan, General Plan and zoning amendments, and FEIR certification as reflected in Planning Commission Resolution 2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2 ().

The Planning Commission recommended that the City Council certify the EIR and adopt the Specific Plan, subject to further recommended revisions and additions. The Planning Commission’s recommendation to Council encompasses the following modifications to the Specific Plan and policy issues for further Council consideration:
• Remediation: All reporting submitted to regulatory agencies should be concurrently submitted to the City for the City to make available to the public. Regulatory reports should be current at time of permit issuance, inspection, and occupancy; if not, City will withhold or permits or cease processing. Post-occupancy, regulatory reports must remain current and submitted concurrently to the City to make available for public inspection. If not, the matter would be addressed by the City through various oversight mechanisms including discretionary permit revocation (if applicable), or code enforcement.
• Energy: An audit mechanism monitoring the project’s energy use and generation over build out, that has built in consequences should targets not be reached, should be implemented. • Lab Uses: Chapter 3 land use regulations should be amended to require Conditional Use Permit approval for laboratory uses classified as BSL-3 and above. • Circulation: Council should consider restricting use and/or design of Class I facilities specifically to avoid collisions between pedestrians and cyclists with e-bikes and e-scooters. Council should consider upgrading the Baylands-Central Brisbane shuttle schedule to serve during the afternoon and later in the evening.
• Mission Blue Nursery: Recommend Council allow nursery to remain in its current location unless or until a feasible option can be provided.
• Open Space: Conservation easements beyond what the Plan presently envisions should be required for all open space areas, per the Sierra Club's June 10 letter. • Implementation: Council should implement staff’s recommended edits presented in the 7/23 agenda report to clarify the anticipated remediation process and relationship to city permitting.

Page 5 of 151 ends

Attachment 3

Page 23 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 4 of 11
• Hospitality Zoning and Building Types: Council should implement staff’s recommended edits to Chapter 3 presented in the 7/23 agenda report to clarify that hospitality uses and building types are permitted in the medium density commercial district. • Residential Density and Commercial Intensity: Council should implement staff’s recommended edits to Chapter 3 presented in the 7/23 agenda report to clarify that minimum residential density and commercial intensity standards are applied on an average basis by land use designation and are not evaluated on a block-by-block basis.

The Planning Commission’s recommendation on the Bayshore Mobility Plan is that the Council adopt the Bayshore Mobility Plan elements that implement mitigation measures in the Final EIR, excluding all other elements including a road diet on Bayshore Boulevard. The Commission recommended further study of the feasibility for a continuous pedestrian/bike facility or sidewalk without a road diet.

Discussion
Overview of Measure JJ and General Plan Requirements
Measure JJ (General Plan Amendment GPA‑1‑18), approved by 55% of Brisbane voters in November 2018, established the land use framework for the Baylands subarea: a Planned Development designation allowing a range of 1,800–2,220 housing units (limited to the northwest portion of the site), up to 6.5 million square feet of commercial uses, and an additional 500,000 square feet of hotel space. Measure JJ also set out standards to be incorporated into the Specific Plan and an associated development agreement for the Baylands subarea. As described in detail in the June 25, 2026 Planning Commission Agenda Report () and Chapter 1, Table 1.4.1 of the Specific Plan, those requirements include, among others:
1 • Approved remediation and landfill-closure plans in compliance with Title 27 (Measure JJ Topics 3.A,

3.C, 3.F, 3.K —anticipated to be discussed October 6);
• Enforceable cleanup schedules and phasing tied to remediation milestones (Measure JJ Topics

3.A/3.D/3.K — anticipated to be discussed October 6);
• Proof of a reliable water supply prior to site development (Measure JJ Topic 3.B — anticipated to be discussed October 6);
• Revenue-positive development for the City at all stages of buildout (Measure JJ Topics 3.D/3.E — anticipated to be discussed October 15);
• Preservation and enhancement of key habitat areas and open space (Measure JJ Topic 3.H — anticipated to be discussed September 29);
• Protection and adaptive reuse of the historic Roundhouse (Measure JJ Topic 3.I — anticipated to be discussed September 29);
• Resilience to sea level rise (Measure JJ Topic 3.J — anticipated to be discussed September 29); • A transportation and transit program addressing mobility within and around the site (Measure JJ Topic 3.D — anticipated to be discussed September 29); and • A sustainability framework for new development consistent with the City's 2015 Sustainability Framework for the Brisbane Baylands, with development designed to be “energy neutral on an ongoing basis” (Measure JJ Topic 3.G — discussed below). 1 Specific Plan, Table 1.4.1, "General Plan Baylands Provisions Compliance" (pp. 1-10 to 1-14).

Page 6 of 151 ends

Attachment 3

Page 24 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 5 of 11
To approve the project, the Council will need to find that the Specific Plan is consistent with the General Plan, including Measure JJ’s policies. A truncated summary of staff’s analysis of Measure JJ/General Plan consistency is provided in . The June 25, 2026, Planning Commission agenda report () sets out staff's analysis provided to the Planning Commission regarding consistency in greater detail, organized by Specific Plan chapter; staff will not repeat that chapter-by-chapter analysis here except as it relates to the topics below.

Energy Use and Sustainability Framework Consistency (Measure JJ Topic 3.G) Measure JJ provision 3.G (General Plan Policy BL.1(G)) states: “The required specific plan for the Baylands shall include a sustainability program for new development consistent with the principles of the Sustainability Framework for the Brisbane Baylands, Final Report accepted by the City Council on November 5, 2015. The Baylands development shall be designed so as to be energy neutral on an ongoing basis.2”
Specific Plan Chapter 4 (Sustainability) is intended to satisfy this requirement. Its policies and standards are built around the City's Sustainability Framework for the Baylands, which itself is based on the One Planet Living program's ten guiding principles: Zero Carbon Buildings, Zero Waste, Sustainable Transport, Local and Sustainable Materials, Local and Sustainable Food, Sustainable Water, Open Space and Habitat, Culture and Heritage, Economic Vitality with Equity and Ecology, and Recreation, Health, Safety and Happiness. Specific Plan Table 4.2.1, Summary of One Planet Principles for The Baylands (Chapter 4, pages 4-2 through 4-5), sets out staff's analysis of the Specific Plan’s consistency with each principle; the key commitments under each are summarized below.3
• Zero-Carbon Buildings — development under the Specific Plan is projected to generate a minimum of 85,000 megawatt hours (MWh) per year of on-site solar generation (rooftops, parking areas, and a 55-acre solar farm), which would be supported by 30 megawatts (MW) of distributed on-site battery storage and augmented with the use of WestLight Energy's 100% renewable electricity to the maximum extent allowed by law, and new development is required to be all-electric residential and commercial buildings with no new natural gas service; • Zero Waste — 90% diversion of non-hazardous construction/demolition waste from landfills (per City ordinance), 100% recycling/salvage of inert excavation and land-clearing material, and a zero-waste program (with Recology San Francisco) targeting 90% diversion of ongoing non-hazardous waste;
• Sustainable Transport — a transit-served, pedestrian-oriented mix of uses; electric vehicle (EV) charging, shuttle systems, and secure bike parking; and shared workspaces to reduce off-site travel demand;
• Local and Sustainable Materials and Food — material standards for embodied carbon and low-emitting products; a farmers' market/food truck space, an urban farm or community garden, and coordination with the City's Economic Vitality Director and Chamber of Commerce to attract a grocery/supermarket use;
• Sustainable Water — a Water Recycling Facility and “purple pipe” recycled water system; flood and sea-level-rise protection through 2100 per Measure JJ Topic 3.J (General Plan Policy BL.1(J)) and FEIR Mitigation Measures MM HWQ-3a/3b; stormwater detention to prevent any net increase in 2 General Plan Policy BL.1(G); Specific Plan, Table 1.4.1 (pp. 1-10 to 1-14) and Chapter 7, § 7.2.5. 3 Specific Plan, Chapter 4, Table 4.2.1, "Summary of One Planet Principles for The Baylands" (pp. 4-2 to 4-5).

Page 7 of 151 ends

Attachment 3

Page 25 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 6 of 11
peak flows; and wetland restoration providing natural runoff treatment (more details anticipated at the October 6, 2026, meeting regarding water infrastructure); • Open Space and Habitat — 148.4 acres (27.9% of land area) of open space, exceeding the General Plan's 25% requirement, plus restoration of Visitacion Creek, the lagoon's north shore, and Icehouse Hill butterfly habitat (Measure JJ Topic 3.H – September 29, 2026, meeting); • Culture and Heritage — rehabilitation of the historic Roundhouse for community use, a Baylands Public Art Program, and a new library within the Specific Plan area (Measure JJ Topic 3.I – September 29, 2026, meeting); and
• Economic Vitality and Recreation/Health/Safety/Happiness – addressed throughout the Land Use, Circulation, and Open Space chapters (September 29, 2026, meeting).

Other key features of the energy and green building program • At least 85,000 MWh/year of renewable electricity generated within the Baylands; the Final EIR models approximately 92,445 MWh/year at full buildout;
4 • At least 30 MW of distributed battery storage; the Specific Plan also permits additional battery storage, including a potential centralized utility-scale battery storage facility or facilities up to 500 MW in capacity to serve as a regional grid resource;;
• All-electric new buildings (no natural gas service) and compliance with CALGreen Tier 1 requirements for insulation, energy and water conservation, cool roofs, solar panels, net metering, EV charging, HVAC, and window/lighting standards, updated to reflect that EV-ready infrastructure formerly under CALGreen Tier 1 (2022) is now mandatory under the 2025 code; • Compliance with the most current applicable CALGreen Tier 2 EV-charging requirements, or more stringent City requirements, as required by Mitigation Measure MM AQ-1k; 5 • Green building certification: LEED Gold Building Design + Construction (BD+C) for commercial buildings and GreenPoint Rated checklists for residential buildings, each in effect at the time of a development application, secured and paid for by the developer; and • A 90% non-hazardous waste diversion program under the Zero Waste principle, added by staff in the 2026 Staff-Recommended Specific Plan to strengthen alignment with the One Planet principles.

At the June 30, 2026, Commission hearing, the Planning Commission requested that staff specifically address whether the project complies with Measure JJ’s requirement that development be “energy neutral on an ongoing basis.” Staff responded that it is staff’s conclusion that the Specific Plan meets this requirement, based on the fact that 100 percent of projected building energy demand at buildout would be supplied by renewable sources – at least 85,000 MWh/year generated on-site, with any remaining demand met through 100 percent renewable electricity purchased from WestLight Energy.

This approach can be found to fulfill the Sustainability Framework’s zero-carbon-buildings objective through renewable generation rather than relying on offsets or carbon credits. The EIR’s energy analysis (Impacts EN-1 and EN-2)6concludes that the combination of onsite renewable generation, battery storage, all electric buildings, the transit oriented site design, and the Transportation Demand Management program would avoid wasteful or inefficient energy consumption and would not conflict with applicable regional or local energy plans, including Plan Bay Area 2050 and the City’s Climate Action 4 FEIR, Volume 2, § 4.11 (Energy Resources), pp. 4.11-1 to 4.11-43. 5 FEIR, Volume 5, Chapter 15, pp. 15-54 to 15-62.
6 FEIR, Volume 2, § 4.11 (Energy Resources), pp. 4.11-1 to 4.11-43.

Page 8 of 151 ends

Attachment 3

Page 26 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 7 of 11
Plan. Together, this analysis can support the conclusion that the 2026 Staff Recommended Specific Plan is consistent with the Sustainability Framework's principles and Measure JJ's policy that development be designed to be energy-neutral on an ongoing basis.

Planning Commission Recommendation- Energy Auditing and Enforcement At its August 13, 2026, meeting, the Planning Commission discussed the value of verifying, over time, that the Baylands' actual energy performance matches the design-stage commitments described above.

The Commission recommended that the City Council consider developing metrics for auditing actual annual post-occupancy energy use, on-site renewable energy generation, and battery performance at the Baylands – potentially through a periodic performance audit or public reporting requirement – so the City and public can track real-world performance against the projections anticipated by today’s analysis as the project builds out over its approximately 20-year horizon. 7 Collecting full-site energy-use and solar-production data for the Baylands would be complex and challenging. Utility privacy rules limits access to detailed consumption information, and utility data does not capture solar generation produced and consumed onsite. Obtaining complete data would require coordinated participation from multiple building owners and tenants, continuous upkeep of data‑collection systems, and reliance on information sources that may remain incomplete or inconsistent. As a result, any reporting framework would likely provide only a partial picture of overall energy performance.

Several potential data‑collection approaches exist, each with notable limitations:
• A developer-managed consent system, requiring individual authorization from owners and tenants for both utility and solar‑inverter data. Authorizations expire periodically, and participation would likely be uneven.
• Use of aggregated utility data obtained through an authorized partnership, supplemented with modeled solar-production estimates; modeled values cannot fully reflect real-world operating conditions.

Brisbane Building Efficiency Program (BBEP) reporting required under Chapter 15.77 of the BMC, which provides annual energy and water data – including separated energy use and solar production – for buildings over 10,000 square feet. This would allow for partial aggregation for Baylands buildings covered by the program. However, the BBEP excludes smaller and residential buildings and requires staff involvement, which may become more challenging as the number of covered buildings increases.

The difficulty of obtaining complete, building‑level energy data also affects enforceability. Privacy rules, fragmented ownership, and limits on City authority over post‑occupancy behavior constrain the City’s ability to enforce requirements tied to real‑world operational outcomes rather than prescriptive design standards.

For example, the City’s BBEP – described above – achieves a roughly 95% compliance rate because it requires annual reporting and verification of prescriptive reductions in greenhouse‑gas emissions, energy use, and water consumption, with enforcement through notices of violation and citations under 7 August 13, 2026 Planning Commission Memorandum ().

Page 9 of 151 ends

Attachment 3

Page 27 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 8 of 11
the BMC. These requirements regulate reporting and compliance with defined standards, not a building’s actual day‑to‑day energy performance.

In contrast, enforcing operational performance – such as requiring buildings to meet specific real‑world energy‑use targets or ensuring on‑site solar and battery systems achieve a projected performance – would face other practical barriers. The City has limited authority to influence occupant behavior or the functioning of privately owned energy systems. As a result, the most effective enforceability tools remain prescriptive, design‑stage requirements applied during permitting. Staff has not identified any changes to the Specific Plan in response to this recommendation.

Air Quality and Greenhouse Gas Impacts and Mitigation Measures Air Quality
The EIR identifies one significant and unavoidable air quality impact: Impact AQ-1 (Emissions of Criteria Air Pollutants for which the Bay Area Air Basin is in Nonattainment), which remains significant at both the project and cumulative level even after all feasible mitigation. Mitigation measures address off-road construction emissions sources (fugitive dust best management practices, cleaner off-road equipment, low-VOC coatings), on-road construction emissions sources including emissions associated with soil-movement activities (best available control technology for relocating excavated soil from east to west across the site, cleaner on-road trucks), and operational sources (cleaner emergency generators, low-VOC coatings and consumer products, electric landscaping equipment, EV charging beyond code requirements, and controls for truck idling and loading docks). Impact AQ-2, addressing localized exposure to toxic air contaminants (TACs) and associated health risks to sensitive receptors, is reduced to a less-than-significant level with mitigation.8 Mitigation Measure MM AQ-1c’s cleaner off-road construction-equipment requirements reduced cancer risk below the applicable significance threshold, with other Impact AQ-1 mitigation measures providing additional reductions. Additionally, the 2022 California Energy Code requirement that all residential and school buildings provide mechanical ventilation equivalent to MERV-13 filtration further reduces exposure to TACs.

Greenhouse Gas Emissions
The Final EIR evaluates the significance of the project’s GHG emissions under two specific thresholds identified in the EIR: GHG-2, addressing effects on regional GHG emissions, and GHG-3, addressing consistency with applicable GHG-reduction plans, policies, performance standards, and regulations. The EIR concludes that GHG-2 is less than significant and GHG-3 is less than significant with implementation of mitigation measures (specifically MM LUP-2 "Consistency with General Plan Policy C.41 and the Metropolitan Transportation Commission's Transit-Oriented Communities Policy (Resolution No. 4530)" and MM AQ-1k “Electric Vehicle Charging Infrastructure").

Note that the Draft EIR included additional mitigation measures that were modified in connection with the preparation of the 2026 Staff Recommended Specific Plan. Because the project would result in a regional reduction in vehicle miles traveled and greenhouse gas emissions, the draft mitigation measure calling for mandatory offsets was removed from the Final EIR. Other design commitments identified in the Draft EIR that contribute to GHG emission reductions (such as low-GWP refrigerants; preferred parking for alternative-fueled/rideshare vehicles; zero-emission or 100% renewable fuel shuttle service; 8 FEIR, Volume 2, § 4.9 (Air Quality), pp. 4.9-1 to 4.9-56.

Page 10 of 151 ends

Attachment 3

Page 28 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 9 of 11
and 100% renewable fuel wastewater reclamation facility operation) are incorporated into the Specific Plan's Sustainability Framework in Chapter 4 of the Specific Plan, which further contributes to the project’s environmental performance. The Final EIR concludes that project GHG emissions would not be significant and unavoidable:
• Impact GHG-2 (regional GHG emissions) – less than significant. The Baylands' 2,200 dwelling units,

6.5 million square feet of commercial use, and 500,000 square feet of hotel use are already accounted for in Plan Bay Area 2050's regional growth projections; because the project's transit-oriented location and design would reduce regional mobile-source GHG emissions relative to that same growth occurring elsewhere in the region, Impact GHG-2 is less than significant without mitigation;9and
• Impact GHG-3 (consistency with climate plans, policies, and standards) – less than significant with mitigation incorporated. The Final EIR found the project consistent with most Bay Area Air District 2022 CEQA threshold elements (no natural gas service; not wasteful/inefficient per Impact EN-1; and, per the Transportation analysis, per-capita VMT for Baylands residents and employees more than 35% below the nine-county regional average) and with CARB's 2022 Scoping Plan actions. However, as originally proposed, the project would not have met CALGreen Tier 2 voluntary EV charging standards (proposing EV infrastructure at 6,924 of the Plan's maximum 11,000 parking spaces) and would have been inconsistent with MTC's Transit-Oriented Communities Policy (Resolution No. 4530) — both of which the Final EIR treated as a potentially significant impact. Mitigation Measure MM LUP-2 (the same minimum-density/FAR standard scheduled for discussion at the September 29, 2026, meeting – 25 du/acre and FAR 2.0 within one-half mile of the Bayshore Caltrain Station, plus reduced parking ratios for lower-density housing types) resolves the MTC policy inconsistency, and Mitigation Measure MM AQ-1k (requiring compliance with current CALGreen Tier 2 EV charging standards) resolves the EV charging shortfall; together they bring Impact GHG-3 to less than significant with mitigation incorporated.10 Fiscal Impact
Measure JJ requires that Baylands development be revenue positive to the City on an annual basis where all City costs (e.g., annual operating costs, maintenance and replacement of equipment, facilities, infrastructure, cultural resource and habitat protection and management etc.) are exceeded by Project generated revenues to the City (e.g., to the City’s General Fund, enterprise funds, special funds, etc.) during all phases of development and upon final buildout (provision 3.E). The applicant has prepared a fiscal impact analysis for the project. This analysis is undergoing peer review by the City’s consultant Keyser Marston Associates. The fiscal impact analysis and results of the peer review by Keyser Marston will be attached to a future staff report for the public and Council’s consideration, currently anticipated to be addressed at the Council’s October 15, 2026, meeting.

Environmental Impact
A Final Environmental Impact Report (FEIR) (SCH #2006022136) has been prepared for this project in accordance with the California Environmental Quality Act (CEQA). The FEIR includes the Draft EIR (DEIR), revisions to the DEIR, comments received on the DEIR, a list of commenters, the City’s responses to significant environmental points raised during the DEIR comment period, and any other information 9 FEIR, Volume 5, Chapter 15, pp. 15-51 to 15-53.
10 FEIR, Volume 5, Chapter 15, pp. 15-54 to 15-62 (Mitigation Measures MM LUP-2 and MM AQ-1k).

Page 11 of 151 ends

Attachment 3

Page 29 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 10 of 11 added by the City. Should the Council act to certify the Final EIR, it will need to make Findings and Statements of Overriding Considerations, as well as adopt a Mitigation Monitoring and Reporting Program, consistent with CEQA statutory requirements.

Attachments

1. 2026 Staff Recommended Specific Plan (link)

2. 2026 Final EIR (link)

3. Staff-Recommended Baylands Specific Plan General Plan/Measure JJ Consistency

4. June 25, 2026 Planning Commission Agenda Report (includes full project background, chronology, and Planning Commission recommendation) (link)

5. August 13, 2026 Planning Commission Memorandum (link)

6. July 23, 2026 Planning Commission Memorandum (link)

7. June 30, 2026 Planning Commission Memorandum (link)

8. June 11, 2026 Planning Commission Memorandum and workshop presentation (FEIR overview) a. Memorandum (link)
b. Workshop Presentation (link)

9. May 28, 2026 Planning Commission Memorandum and workshop presentation (Specific Plan overview)
a. Memorandum (link)
b. Workshop Presentation (link)

10. Planning Commission Resolution 2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2 (recommending the City Council (1) Certify the Final Environmental Impact Report, (2) Approve the Brisbane Baylands Specific Plan, (3) Amend Title 17 of the Brisbane Municipal Code, and (4) Amend the Brisbane General Plan’s Land Use and Circulation Elements)

11. Planning Commission Resolution PC-01-26 (recommending the City Council adopt the Bayshore Mobility Plan, with modifications) pursuant to General Plan Circulation Element Policy C.1 and Program C.1.B)

12. Redline copies of General Plan and Zoning Ordinance Amendments a. Map Amendments
i. GP Circulation Element - Proposed Figure C-3 (Draft) (link) ii. GP Circulation Element - Proposed Figure C-4 (Draft) (link) iii. GP Land Use Map - Proposed Baylands Specific Plan Land Use (Draft) (link) iv. Zoning Map - Proposed Baylands Specific Plan Zoning District (Draft) (link) b. Text Amendments
v. BMC Title 17 Zoning - Redline (link)
vi. General Plan Chapter 5 Land Use - Redline (link)
vii. General Plan Chapter 6 Circulation - Redline (link)

Page 12 of 151 ends

Attachment 3

Page 30 of 169 ends

Baylands Specific Plan and EIR- Meeting 1 Page 11 of 11

13. Additional net-zero/carbon-neutral project comparison materials (referenced in July 23, 2026, memorandum, Attachment 4) (link)

14. Planning Commission Meeting Minutes – May 28 to August 13, 2026 (Adopted and Draft)

15. Notice of Public Hearing: Planning Commission – June 25, 2026 (link)

16. Notice of Public Hearing: City Council – September 4, 2026 ___________________________________ ________________________________ Julia Ayres, Community Development Director Jeremy Dennis, City Manager JuliaAyres

Page 13 of 151 ends

Attachment 3

Page 31 of 169 ends

Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 1
Attachment 1: 2026 Staff Recommended Specific Plan
2026 Staff Recommended Specific Plan
https://www.brisbaneca.gov/775/2026-Baylands-Specific-Plan 1

Page 14 of 151 ends

Attachment 3

Page 32 of 169 ends

Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 2
Attachment 2: 2026 Final EIR
2026 Final EIR
https://www.brisbaneca.gov/774/2026-Final-EIR
1

Page 15 of 151 ends

Attachment 3

Page 33 of 169 ends
Page 1 of 9 ends

Staff-Recommended Baylands Specific Plan General Plan/Measure JJ Consistency (EXTRACTED AND ANNOTATED FROM TABLE 1.4.1 OF THE BAYLANDS SPECIFIC PLAN) General Plan Baylands Provisions
(MEASURE JJ)
Compliance Summary in the BSP Where to find in the BSP, EIR, or Other Documents
Policy BL1. Development within The Baylands
Subarea shall be subject to the City’s approval of
a single specific plan for the entirety of The
Baylands Subarea and a development agreement
that is consistent with General Plan policies,
incorporates all applicable EIR mitigation
measures, and is consistent with the following
standards:

This single Specific Plan has been prepared
for the entirety of the Baylands Subarea and
those portions of the Beatty Subarea that are
also owned by Sunquest and managed by
BDI. A Development Agreement will be
required pursuant to General Plan Policy GP-1-18 and will be considered in connection with implementation of the Specific Plan.

Chapter 01, Introduction, through
Chapter 09, Implementation
A. The single Specific Plan and development
agreement subject to City review and
approval referenced above shall include:
i) Detailed plans for Title 27 compliant
closure of the landfill and Remedial
Action Plans for OU-1 and OU-2 that have
been approved by all appropriate
regulatory agencies, which include, but
shall not be limited to, CalRecycle, the San
Mateo County Environmental Health
Department, the California Department of
Toxic Substances Control (DTSC), the
California Regional Water Quality Control
Board
Remedial Action Plans (RAPs) have been
completed and were approved for OU-1
(hereafter referenced as OU-SM) and OU-2
by the appropriate regulatory agencies. The
lead environmental oversight agency for OU-SM is the State Department of Toxic Substances Control (DTSC), and the lead for
OU-2 is the San Francisco Bay Regional Water
Quality Control Board (San Francisco Bay
RWQCB). Remedial Design Implementation
Plans (RDIPs) are currently being prepared
for review and approval by the DTSC and San
Francisco Bay RWQCB. The RDIPs will reflect
updated remediation schedules consistent
with current agency requirements. The
Landfill Closure Plan prepared in compliance
Chapter 01, Introduction; Chapter 09,
Implementation; Remedial Action Plans
(RAPS-SM & OU-2); Landfill Closure Plan
Baylands Specific Plan and EIR- Meeting 1
ATTACHMENT 3
Attachment 3

Page 34 of 169 ends
Page 2 of 9 ends

General Plan Baylands Provisions
(MEASURE JJ)
Compliance Summary in the BSP Where to find in the BSP, EIR, or Other Documents
with Title 27 was submitted to the San
Francisco Bay RWQCB, CalRecycle, and San
Mateo County Environmental Health and has
been approved. The Landfill Closure Plan for
the landfill protects human health and the
environment through the required
implementation of specific grading and
remediation activities. Anticipated
remediation and closure sequencing is
provided in Chapter 09, Implementation.
ii) A specific schedule establishing the time
frames by which (i) the landfill must be
closed in full compliance with Title 27 and
(ii) the remediation of OU-1 and OU-2
must be completed
Tentative schedules for completing
remediation of OU-SM and OU-2 are
presented in the approved RAPs. The
projected completion date for site
remediation is mid-2027. These schedules
will be updated in the RDIP documents and
detailed schedules for the implementation of
each remediation element will be provided in
those documents. A schedule for completion
of the landfill closure was provided in the
Landfill Closure Plan, which indicated that
the schedule for completing the landfill
closure is within 10 years of its approval.

These schedules are incorporated into
Chapter 09, Implementation.

Chapter 09, Implementation, Section 9.3,
Specific Plan Implementation; Remedial
Action Plans (RAPS-SM & OU-2); Landfill
Closure Plan
iii) Specific means by which the City may
enforce the applicant’s adherence to the
schedule for closure and remediation and
specific consequences, e.g., monetary
penalties, suspension of building permits,
The Specific Plan and approved RAPs identify
regulatory orders, which include financial
assurance requirements and mechanisms
that the lead environmental oversight
agencies (i.e., DTSC and San Francisco Bay
Chapter 09, Implementation, Section 9.3,
Specific Plan Implementation; Remedial
Action Plans (RAPS-SM & OU-2)
Baylands Specific Plan and EIR- Meeting 1
ATTACHMENT 3
Attachment 3

Page 35 of 169 ends
Page 3 of 9 ends

General Plan Baylands Provisions
(MEASURE JJ)
Compliance Summary in the BSP Where to find in the BSP, EIR, or Other Documents
etc., that the City may impose on the
applicant for failing to adhere to the
schedule
RWQCB) will use as legally binding
mechanisms to compel the applicant’s
adherence to closure and remediation scopes
and schedules. The Development Agreement
with the City will include City compliance
enforcement provisions to ensure timely
completion of remediation requirements.

The Development Agreement also includes
the requirement that remediation be
completed prior to initiating construction
activities.

B. A reliable water supply approved by the City
of Brisbane to support proposed uses within
The Baylands shall be secured prior to site
development.

California Water Service Company (Cal
Water) is identified as the intended water
service provider for The Baylands, Sierra
Point, and Beatty areas, consistent with the
Water Supply Assessment approved by Cal
Water. Formal provision of water service
remains subject to applicable regulatory
approvals, service territory actions,
infrastructure planning, and project-level
water supply verification. Water to The
Baylands is anticipated to be provided by
existing turnouts from the San Francisco
Public Utilities Commission (SFPUC) regional
water system; no new turnouts or other
infrastructure are needed or proposed to
deliver potable water to The Baylands.

Chapter 07, Infrastructure, Section 7.5.3,
The Baylands Supply
C. All residential development shall be designed
and remediated to accommodate ground
level residential uses and ground level
The RAPs for OU-SM and OU-2, approved by
the DTSC and San Francisco Bay RWQCB,
provide for these at-grade conditions and
Remedial Action Plans (RAPS-SM & OU-2);
Chapter 03, Development and Design
Baylands Specific Plan and EIR- Meeting 1
ATTACHMENT 3
Attachment 3

Page 36 of 169 ends
Page 4 of 9 ends

General Plan Baylands Provisions
(MEASURE JJ)
Compliance Summary in the BSP Where to find in the BSP, EIR, or Other Documents
residential-supportive uses such as daycare,
parks, schools, playgrounds, and medical
facilities.
uses. (Note: Residential land use is prohibited
within the landfill footprint.) The open space
plan organized a central open space serving
the Bayshore and Roundhouse districts and
adjacent development areas along Geneva
Avenue. The approved RAPs require that
OU-SM and OU-2 be remediated to a level
that is safe for at-grade amenities including
residences, playgrounds, and park space.

Standards, Section 3.2, Building Type
Standards
D. Each increment of development shall be
provided with appropriate transportation
related and other infrastructure, facilities,
and site amenities as determined by the City.

Such transportation related and other
infrastructure, facilities, and site amenities
(e.g., parks, open space preservation, habitat
enhancement) shall be provided at the
developer’s cost.

The Specific Plan accounts for all land use,
circulation, and infrastructure demands of
the new community and ensures that all of
these components and their needs are
properly assessed, mitigated, and provided
for in a timely manner. The identified
infrastructure requirements are based upon
the land use program and urban design
standards. The actual provision and phasing
of infrastructure will occur through Public
Improvements Plans to be submitted as part
of development proposals. This approach
ensures that the impacts on City
infrastructure systems—sewer, drainage, and
circulation—that are produced by the
buildout of The Baylands will be largely
mitigated on the site.

Chapter 00, Vision and Executive Summary,
Section 0.5, Community Design Structure;
Chapter 02, Land Use Program and
Planning Districts, Section 2.3, Land Use
Program; Chapter 05, Conservation and
Open Space, Section 5.3.4, Open Space
Protection, Restoration, and Enhancement;
Chapter 06, Circulation, Section 6.2,
Planning Context; Chapter 08, Public
Facilities Financing; Chapter 09
Implementation, Section 9.3, Specific Plan
Implementation; Infrastructure Report
E. The Baylands development shall be revenue
positive to the City on an annual basis where
all City costs (e.g., annual operating costs,
maintenance and replacement of equipment,
Chapter 08, Public Facilities Financing,
requires implementation of this
requirement in relation to both financing of
Chapter 08, Public Facilities Financing
Baylands Specific Plan and EIR- Meeting 1
ATTACHMENT 3
Attachment 3

Page 37 of 169 ends
Page 5 of 9 ends

General Plan Baylands Provisions
(MEASURE JJ)
Compliance Summary in the BSP Where to find in the BSP, EIR, or Other Documents
facilities, infrastructure, cultural resource and
habitat protection and management etc.) are
exceeded by Project generated revenues to
the City (e.g., to the City’s General Fund,
enterprise funds, special funds, etc.) during all
phases of development and upon final
buildout.
infrastructure construction and ongoing City
costs and revenues for The Baylands.

Baylands Specific Plan and EIR- Meeting 1
ATTACHMENT 3
Attachment 3

Page 38 of 169 ends
Page 6 of 9 ends

F. Sufficient assurances for the satisfactory
ongoing performance of site remediation and
site development (e.g., site monitoring,
performance bonds, environmental
insurance) shall be provided as determined by
the City.

The OU-SM and OU-2 RAPs and Landfill
Closure Plan approvals include performance
and schedule milestones that will be
monitored and enforced by the DTSC and
San Francisco Bay RWQCB, with input from
the City. The process will also include public
notice, review, and comment opportunities
at major remediation project milestones. The
remediation project and landfill closure will
not be deemed complete until a final public
review and comment period is held by the
DTSC and San Francisco Bay RWQCB. Once
the remedy is completed, the landfill is
closed, and the project goes into long-term
operation, maintenance, and monitoring
mode, the DTSC and San Francisco Bay
RWQCB will require the applicant to enter
into an Operation and Maintenance (O&M)
Agreement for OU-SM and OU-2 and post-closure waste discharge requirements for the landfill, which will require that the applicant
post financial assurances to implement the
O&M Plans. The O&M Plans, which will be
approved as part of the RDIPs and Landfill
Closure Plan, will specify monitoring,
inspection, and reporting requirements as
well as protocol to maintain the remedy
components (e.g., landfill final cover,
leachate management system, landfill gas
collection and control system, etc.). The City
is among the reviewing agencies for the
RDIPs, Landfill Closure Plan, and O&M
Agreement approvals.

Remedial Action Plans (RAPS-SM & OU-2);
Landfill Closure Plan
Baylands Specific Plan and EIR- Meeting 1
ATTACHMENT 3
Attachment 3

Page 39 of 169 ends
Page 7 of 9 ends

General Plan Baylands Provisions
(MEASURE JJ)
Compliance Summary in the BSP Where to find in the BSP, EIR, or Other Documents
G. The required specific plan for The Baylands
shall include a sustainability program for new
development consistent with the principles
of the Sustainability Framework for the
Brisbane Baylands, Final Report accepted by
the City Council on November 5, 2015. The
Baylands development shall be designed so as
to be energy neutral on an ongoing basis.

Chapter 04, Sustainability Framework,
provides a sustainability program consistent
with each of the 10 principles of the
Sustainability Framework for the Brisbane
Baylands.

The Specific Plan provides on-site electricity
generation, including solar-powered
infrastructure systems totaling

59.8 megawatts (MW) of capacity and a
minimum of 85,000 megawatt-hours (MWh)
of annual generation. The Baylands would be
100% powered by renewable electricity, the
majority of which would be generated on the
site. In addition, 30 MW of battery-based
stationary energy storage systems would be
installed as part of site-specific development
projects, along with a proposed 250 MW
front-of-the-meter, utility-scale battery
storage facility.

Chapter 04, Sustainability Framework (all
sections), Section 4.2, Brisbane General
Plan and The Sustainability Framework for
The Baylands, covers Zero-Carbon Buildings
H. Key habitat areas, including Icehouse Hill and
Brisbane Lagoon and adjacent habitat as
identified in the 2001 City Open Space Master
Plan shall be preserved, enhanced, and
protected.

Icehouse Hill and Lagoon Habitat will be
preserved, enhanced, and protected, which
includes conservation, revegetation, invasive
species management, fencing, signage, the
creation of Visitacion Creek wetland and
upland buffers, and measures to reduce
negative impacts such as stormwater and
erosion control. Preservation, enhancement,
and protection are also described throughout
Chapter 05, Conservation and Open Space.

Chapter 05, Conservation and Open Space,
Section 5.3.3, Biotic/Habitat Zones,
Section 5.3.4, Open Space Protection,
Restoration, and Enhancement,
Section 5.3.5.4, Ecological Greenspaces.

Refer also to the Wetland Mitigation and
Monitoring Plan (Final EIR [2026] Mitigation
Measure MM BIO-2d), Butterfly Protection
Plan (Final EIR [2026] Mitigation Measure
MM BIO-1c), Marsh Protection Plan and
Adaptive Management Plan
Baylands Specific Plan and EIR- Meeting 1
ATTACHMENT 3
Attachment 3

Page 40 of 169 ends
Page 8 of 9 ends

General Plan Baylands Provisions
(MEASURE JJ)
Compliance Summary in the BSP Where to find in the BSP, EIR, or Other Documents
I. The historic Roundhouse shall be protected
and preserved. The required specific plan shall
ensure rehabilitation of the Roundhouse for
adaptive reuse at the developer’s cost.

The Specific Plan includes the preservation
and rehabilitation of the historic
Roundhouse building.

Chapter 03, Development and Design
Standards, Section 2.5.1, Bayshore District;
Chapter 05, Conservation and Open Space,
Section 5.3.5.3, Community Greens
J. Development shall be designed to protect
uses from the 100-year flood, including 100
years of projected sea level rise as
determined based on regulatory standards or
guidelines in effect at the time of Project
construction, with the reference to guidelines
and sea level rise projections approved by the
Director of Public Works/City Engineer based
on context specific considerations of risk
tolerance and adaptive capacity.

As described in Chapter 07, Infrastructure,
the project will protect uses from the 100-
year flood, including end of century (2100)
sea level rise estimates as defined by the
State of California Sea-Level Rise Guidance,
2024 Update published by the Ocean
Protection Council and California Natural
Resources Agency, and determined based on
regulatory standards or guidelines in effect at
the time of project construction, with
reference to guidelines and sea level rise
projections approved by the Director of
Public Works/City Engineer based on
context-specific considerations of risk
tolerance and adaptive capacity. Chapter 07,
Section 7.3.6, The Baylands Grading
Sequence, establishes the grading criteria for
the development parcels, historical
structures, open space areas, wetlands, and
proposed on-site streets to maintain
minimum protection against end of century
(2100) sea level rise as described in
Section 7.3.5, Flood Risk and Sea Level Rise.

Chapter 07, Infrastructure, Sections 7.3.4,
Site Remediation, 7.3.5, Flood Risk and Sea
Level Rise, and 7.3.6, The Baylands Grading
Sequence
K. Prior to the issuance of a grading permit to
export soil or move soil from the existing
landfill area for incorporation in a remediation
Most soil will be reused on the site in OU-SM
and OU-2 as described in the RAPs. A soil
plan (including testing specifications) for soil
Remedial Action Plans (RAPS-SM & OU-2)
Baylands Specific Plan and EIR- Meeting 1
ATTACHMENT 3
Attachment 3

Page 41 of 169 ends
Page 9 of 9 ends

General Plan Baylands Provisions
(MEASURE JJ)
Compliance Summary in the BSP Where to find in the BSP, EIR, or Other Documents
or grading plan, the soil shall be tested in a
manner approved by the City.
to be relocated from the landfill area and
placed in OU-SM and OU-2 is included in the
forthcoming RDIPs for OU-SM and OU-2.

Baylands Specific Plan and EIR- Meeting 1
ATTACHMENT 3
Attachment 3

Page 42 of 169 ends

Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 4
Attachment 4: June 25, 2026 Planning Commission Agenda Report June 25, 2026 Planning Commission Agenda Report
https://brisbaneca.portal.civicclerk.com/event/6871/files/agenda/10406 1

Page 25 of 151 ends

Attachment 3

Page 43 of 169 ends

Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 5
Attachment 5: August 13, 2026 Planning Commission Memorandum August 13, 2026 Planning Commission Memorandum
https://brisbaneca.portal.civicclerk.com/event/6959/files 1

Page 26 of 151 ends

Attachment 3

Page 44 of 169 ends

Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 6
Attachment 6: July 23, 2026 Planning Commission Memorandum July 23, 2026 Planning Commission Memorandum
https://brisbaneca.portal.civicclerk.com/event/6872/files 1

Page 27 of 151 ends

Attachment 3

Page 45 of 169 ends

Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 7
Attachment 7: June 30, 2026 Planning Commission Memorandum June 30, 2026 Planning Commission Memorandum
https://brisbaneca.portal.civicclerk.com/event/6915/overview 1

Page 28 of 151 ends

Attachment 3

Page 46 of 169 ends

Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 8
Attachment 8: June 11, 2026 Planning Commission Memorandum and Workshop Presentation (FEIR Overview)
a. Memorandum
https://brisbaneca.portal.civicclerk.com/event/6858/files/agenda/9383 b. Workshop Presentation
https://www.brisbaneca.gov/DocumentCenter/View/3173/Environmental-Review-Overview---Public-Workshop-2- Presentation
1

Page 29 of 151 ends

Attachment 3

Page 47 of 169 ends

Baylands Specific Plan and EIR - Meeting 1
ATTACHMENT 9
Attachment 9: May 28, 2026 Planning Commission Memorandum and Workshop Presentation (Specific Plan Overview)
a. Memorandum
https://brisbaneca.portal.civicclerk.com/event/6870/files/agenda/9360 b. Workshop Presentation
https://www.brisbaneca.gov/DocumentCenter/View/3137/Specific-Plan-Overview---Public-Workshop-1-Presentation 1

Page 30 of 151 ends

Attachment 3

Page 48 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2
1 PLANNING COMMISSION RESOLUTION NO. 2021-ER-1/2021-SP-1/2021-RZ-3/2021- GPA-2

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF BRISBANE,

CALIFORNIA, FOR THE BRISBANE BAYLANDS SPECIFIC PLAN PROJECT RECOMMENDING TO CITY COUNCIL (1) CERTIFYING THE FINAL
ENVIRONMENTAL IMPACT REPORT, (2) APPROVING THE BRISBANE BAYLANDS SPECIFIC PLAN, (3) AMENDING TITLE 17 OF THE BRISBANE MUNICIPAL CODE, and (4) AMENDING THE BRISBANE GENERAL PLAN’S LAND USE AND CIRCULATION

ELEMENTS
WHEREAS, The Baylands Specific Plan area encompasses approximately 684.3 acres within the City of Brisbane in northeast San Mateo County, of which 449 acres is owned by Sunquest Properties, Inc. and managed by Baylands Development, Inc. (collectively, “BDI”); and
WHEREAS, in 2005, BDI submitted a specific plan to the City proposing development of approximately 449 acres of the Baylands; and
WHEREAS, in 2011, BDI submitted a revised specific plan that proposed 4,434 residential units, approximately seven million square feet of commercial development, and approximately 169.7 acres of open space; and
WHEREAS, in 2013, a Draft Environmental Impact Report for the 2011 Specific Plan was made available for public review from June 11, 2013, to January 24, 2014; and WHEREAS, on July 18, 2018, the Brisbane City Council certified the Brisbane Baylands Final Program EIR in accordance with the provisions of CEQA for implementation of General Plan Amendment GP-1-18; and
WHEREAS, on July 18, 2018, the Brisbane City Council adopted Resolution 2018-62 approving General Plan Amendment GP-1-18 to amend various provisions of the General Plan related to the Brisbane Baylands General Plan Subarea to allow for a range of 1800-2200 dwelling units and up to 6.5 million square feet of new commercial development, and 500,000 square feet of hotel development, subject to City approval of a specific plan consistent with policies established in GP-1-18; and
WHEREAS, General Plan Amendment GP-1-18 was approved by City of Brisbane voters as Measure JJ in the November 6, 2018, Brisbane elections; and WHEREAS, on January 16, 2020, the City Council adopted General Plan Amendment GP-1-19 to implement GP-1-18 and Measure JJ, and the City Council certified an Addendum to the Brisbane Baylands Final Program EIR pursuant to the requirements of CEQA Guidelines § 15164; and
WHEREAS, on February 20, 2020, the City distributed a Notice of Preparation (NOP) for an EIR, opening a 60-day response period.

Page 31 of 151 ends

Attachment 3

Page 49 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2
2 WHEREAS, pursuant to CEQA Guidelines Section 15082(c)(1), the City of Brisbane held a public scoping meeting for the Draft EIR on March 4, 2020, to provide an opportunity for members of the public and public agencies to provide input on the scope and content of the environmental information and analysis to be included in the EIR for the proposed Baylands Specific Plan; and
WHEREAS, in January 2023, the applicant submitted a revised Specific Plan to supersede the 2011 Specific Plan; and
WHEREAS, on April 26, 2023, the City distributed an updated NOP for the EIR, and provided a 30-day response period starting on April 26, 2023; and WHEREAS, a second scoping meeting for the Draft EIR was held on May 9, 2023, and the updated NOP response period ended on May 25, 2023; and WHEREAS, on April 3, 2025, the City of Brisbane published a revised draft Brisbane Baylands Specific Plan concurrently with the Draft Environmental Impact Report for the Brisbane Baylands Specific Plan Project (“Draft EIR”); and WHEREAS, also on April 3, 2025, the City of Brisbane released a Notice of Availability/Notice of Completion for the Draft EIR, notifying the public and agencies of a 151- day public review period that ran from April 3, 2025, to September 2, 2025; and WHEREAS, the Notice of Availability also discussed the availability of the Draft EIR Appendices, which included a copy of the draft Specific Plan (Draft EIR Appendix A); and WHEREAS, on May 14, 2026, the City published the Staff-Recommended Baylands Specific Plan, which contained various revisions to the 2025 Baylands Specific Plan and was analyzed in Chapter 6 of the Baylands Final EIR as Modified Alternative 1; and WHEREAS, to implement the Specific Plan for Modified Alternative 1, City staff proposes concurrently amending Title 17 of the Brisbane Municipal Code, and amending the Land Use and Circulation Elements of the Brisbane General Plan; and WHEREAS, on May 28, 2026, and June 11, 2026, the Planning Commission conducted public workshops to provide an overview of the Final EIR and the Baylands Specific Plan; and WHEREAS, on June 25, 2026, the Planning Commission conducted a duly noticed public hearing on the Final EIR and the Baylands Specific Plan, at which time any person interested in the matter was given the opportunity to be heard, and continued the public hearing to June 30, 2026, and again to July 23, 2026, on which date the Planning Commission closed the public hearing and commenced its deliberations; and
WHEREAS, on July 23, 2026, and again on August 13, 2026, following close of the public hearing, the Planning Commission deliberated on the Baylands Specific Plan, the associated Final Environmental Impact Report, the proposed Title 17 zoning amendments, and the proposed amendments to the General Plan Land Use and Circulation Elements; the Bayshore

Page 32 of 151 ends

Attachment 3

Page 50 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2
3 Mobility Plan; and considered public testimony and Commission discussion regarding these topics; and
WHEREAS, notice of the Planning Commission public hearing was posted and mailed to property owners of the subject properties and within 300 feet of the boundaries of the subject properties and all interested parties requesting notice, per Brisbane Municipal Code Section

17.54.020, prior to the Planning Commission hearing; and WHEREAS, prior to consideration of General Plan, Specific Plan, and zoning amendments, the Planning Commission is required to make a written recommendation to City Council on the proposed amendments pursuant to Government Code Sections 65354 and 65855; and
WHEREAS, in accordance with Government Code section 65855 and Brisbane Municipal Code section 17.54.010, adoption of the Baylands Specific Plan is consistent with and implements Measure JJ and General Plan Amendments GPA‑1‑18 and GP-1-19, and is consistent with the City’s 2023-2031 Housing Element’s goal to facilitate and support the production of housing. The associated amendments to the Zoning Ordinance and General Plan are consistent with the Baylands Specific Plan.

NOW, THEREFORE, based on the findings set forth herein, the Planning Commission of the City of Brisbane, at its meeting of August 13, 2026, resolves as follows:

Section 1.

A. The above recitals are true and correct and are incorporated herein by reference as if set forth in full.

B. The Planning Commission has reviewed considered the following, including but not limited to, the Specific Plan circulated with the Draft EIR (Draft EIR, Appendix A), the Staff-Recommended Specific Plan, the Draft and Final EIR, the alternatives analyzed in Draft EIR and the Final EIR, and any revisions to these plans set forth in the Final EIR or proposed during public hearing.

C. The Planning Commission of the City of Brisbane recommends the following actions be taken by the City Council of the City of Brisbane:

1. Certify that the Final Environmental Impact Report for the Brisbane Baylands Specific Plan, incorporated by reference as Exhibit A, has been completed in compliance with CEQA; that the Final EIR was presented to the decision-making body of the lead agency and that the decision-making body reviewed and considered the information contained in the Final EIR prior to approving the project; and that the Final EIR reflects the lead agency's independent judgment and analysis; in accordance with CEQA Guidelines section 15090; and

2. Adopt the 2026 Staff-Recommended Baylands Specific Plan, dated May 2026, incorporated by reference as Exhibit B, in accordance with Government Code sections 65450 as a specific plan, and in accordance with Government Code section

Page 33 of 151 ends

Attachment 3

Page 51 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2
4 65850 as a zoning ordinance, each of which independently supports adoption of the specific plan, subject to the following modifications recommended by the Planning Commission:
a. Remediation: All reporting submitted to regulatory agencies shall be concurrently submitted to the City for the City to make available to the public. Regulatory reports shall be current at the time of permit issuance, inspection, and occupancy; if not current, the City shall withhold permits or cease processing. Following occupancy, regulatory reports shall remain current and shall continue to be submitted concurrently to the City for public inspection; if not, the matter shall be addressed by the City through available oversight mechanisms, including discretionary permit revocation (if applicable) or code enforcement. b. Energy: An audit mechanism monitoring the project's energy use and generation over the course of build-out, with built-in consequences should targets not be reached, shall be implemented.
c. Lab Uses: Chapter 3 land use regulations shall be amended to require Conditional Use Permit approval for laboratory uses classified as Biosafety Level 3 (BSL-3) and above.
d. Circulation: The City Council shall consider restricting the use and/or design of Class I bicycle facilities to avoid collisions between pedestrians and cyclists using e-bikes and e-scooters, and shall consider upgrading the Baylands-Central Brisbane shuttle schedule to provide service during the afternoon and later in the evening.
e. Mission Blue Nursery: The City Council shall allow the Mission Blue Nursery to remain in its current location unless and until a feasible relocation option is identified.
f. Open Space: Conservation easements beyond those presently contemplated by the Specific Plan shall be required for all open space areas, consistent with the Sierra Club's June 10, 2026, letter.
g. Implementation: The City Council shall implement staff's recommended edits presented in the July 23, 2026 agenda report to clarify the anticipated remediation process and its relationship to City permitting. h. Hospitality Zoning and Building Types: The City Council shall implement staff's recommended edits to Chapter 3 presented in the July 23, 2026 agenda report to clarify that hospitality uses and building types are permitted in the medium-density commercial district. i. Residential Density and Commercial Intensity: The City Council shall implement staff's recommended edits to Chapter 3 presented in the July 23, 2026, agenda report to clarify that minimum residential density and commercial intensity

Page 34 of 151 ends

Attachment 3

Page 52 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2
5 standards are applied on an average basis by land use designation and are not evaluated on a block-by-block basis.

3. Amend Title 17 of the Brisbane Municipal Code per the draft Ordinance included in Exhibit C to implement the 2026 Staff-Recommended Baylands Specific Plan, in accordance with Government Code sections 65800 to 65912; and

4. Exhibit D, in accordance with Government Code sections 65350 to 65362; and

5. Exhibit E, in accordance with Government Code sections 65350 to 65362.

ADOPTED this 13th day of August 2026, by the following vote:

AYES: FUNKE, GOODING, LAU, SAYASANE, WODZIAK
NOES: None
ABSENT: None
DOUGLAS GOODING, Chair
ATTEST: ________________________________________________ JULIA AYRES, Community Development Director ATTACHMENT 10

Page 35 of 151 ends

Attachment 3

Page 53 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2

EXHIBIT A
Final Environmental Impact Report for the Brisbane Baylands Specific Plan
Incorporated by reference
Available online at: https://www.brisbaneca.gov/774/2026- Final-EIR

Page 36 of 151 ends

Attachment 3

Page 54 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2

EXHIBIT B
2026 Staff Recommended Brisbane Baylands Specific Plan
published May 14, 2026
Incorporated by reference
Available online at: https://www.brisbaneca.gov/775/2026- Baylands-Specific-Plan

Page 37 of 151 ends

Attachment 3

Page 55 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2

EXHIBIT C
Zoning Ordinance Amendments

Page 38 of 151 ends

Attachment 3

Page 56 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2
1 draft
ORDINANCE NO. ___

AN ORDINANCE OF THE CITY OF BRISBANE
AMENDING BMC CHAPTERS 17.04, 17.13, 17.20, 17.32, AND 17.41 TO

AMEND REGULATIONS PERTAINING TO THE

ADOPTION OF THE BAYLANDS SPECIFIC PLAN
The City Council of the City of Brisbane hereby ordains as follows:

SECTION 1: Section 17.04.010 – Establishment of districts in Chapter 17.04 – Establishment of Zoning Districts of the Municipal Code is amended to read as follows:

The districts into which the city is divided are hereby established and designated as follows:

A. R-TUO Residential two unit overlay district.

B. R-1 Residential district.

C. R-2 Residential district.

D. R-3 Residential district.

E. R-MHP: Residential mobile home park district.

F. R-BA: Brisbane acres residential district.

G. C-1: Commercial mixed use district.

H. NCRO: Central Brisbane commercial district.

I. HC: Beatty heavy commercial district.

J. SCRO-1: Southwest Bayshore commercial district.

K. SP-CRO: Sierra Point commercial district.

L. TC-1: Crocker Park trade commercial district.

M. BSP Baylands Specific Plan
N. TC-2: Southeast Bayshore trade commercial district.

O. C/P-U Northwest Bayshore Commercial/Public Utilities District P. MLB: Marsh Lagoon Bayfront district.

Q. O-S: Open space district.

R. PAOZ: Parkside overlay district.

S. P-D: Planned development district.

Page 39 of 151 ends

Attachment 3

Page 57 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2
2 SECTION 2: Section 17.13.035 – Expressly prohibited uses in Chapter 17.13 – C-1 Commercial Mixed-Use District of the Municipal Code is deleted in its entirety and reserved for future use.

SECTION 3: Section 17.13.040 – Development regulations in Chapter 17.13 – C-1 Commercial Mixed-Use District of the Municipal Code is amended to read as follows:

A. No building, structure or land shall be used and no building or structure shall be erected, enlarged, or structurally altered, except for the uses established in Section

17.13.030.
(Subsection B, no change)
SECTION 4: Chapter 17.20 – M-1 Manufacturing District of the Municipal Code is deleted in its entirety and replaced to read as follows:

Chapter 17.20 - BAYLANDS SPECIFIC PLAN DISTRICT

17.20.010 - Purpose.

A. The purpose of this chapter is to establish the Baylands Specific Plan (BSP) District and provide for coordinated planning and design principles for the properties within this district. The BSP District implements the Baylands Specific Plan, the purpose of which is to allow for development consistent with General Plan Amendment GP-1-

18. 17.20.020 - Applicability.

A. The regulations contained in this chapter are intended to implement the Baylands Specific Plan adopted by the City Council on _______, 2026 and shall apply to the areas within the BSP District mapped on the official zoning map.

17.20.030 - Relationship to Other Plans.

A. In the event of inconsistencies or conflict between the Baylands Specific Plan and this title or any other provision of the Brisbane Municipal Code, the provisions of the Baylands Specific Plan take precedence, control, and govern in the BSP district.

Any activities regulated by the Brisbane Municipal Code, but not addressed in the specific plan or this Chapter, shall be regulated by the Brisbane Municipal Code.

Unless otherwise established in the Baylands Specific Plan, all definitions and land use terms shall be interpreted consistent with the Brisbane Municipal Code.

17.20.040 - Allowable Land Uses and Development and Design Standards.

A. Refer to the Baylands Specific Plan for information regarding allowable land uses and development and design standards.

Page 40 of 151 ends

Attachment 3

Page 58 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2
3 17.20.050 - Implementation and Administration.

A. Refer to Chapter 9: Implementation of the Baylands Specific Plan for information regarding implementation and administration.

SECTION 5: Section 17.32.050 – Fences, hedges and walls in Chapter 17.32 – General Use Regulations of the Municipal Code is amended to read as follows:
(Subsections A through B.2, no change)

3. Metal rail-and-picket fences and black or dark green vinyl-coated chain-link fences not exceeding eight (8) feet in height may be constructed in the C-1 and TC-1 districts.
(Subsections B.4 through B.6, no change)
SECTION 6: Chapter 17.41 – Interim Uses in the Baylands Subarea of the Municipal Code is deleted in its entirety.

SECTION 7: The Zoning Map of the City of Brisbane is amended per the attached Exhibit A, as follows:

The parcels of land within the General Plan’s Baylands subarea, as amended by 2021-GPA-2, shall be designated on the Zoning Map of the City of Brisbane as BSP Baylands Specific Plan District.

SECTION 8: If any section, subsection, sentence, clause or phrase of this Ordinance is for any reason held by a court of competent jurisdiction to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council of the City of Brisbane hereby declares that it would have passed this Ordinance and each section, subsection, sentence, clause and phrase thereof, irrespective of the fact that one or more sections, subsections, sentences, clauses or phrases may be held invalid or unconstitutional.

SECTION 9: This Ordinance shall be in full force and effect thirty days after its passage and adoption.
* * *
The above and foregoing Ordinance was regularly introduced and after the waiting time required by law, was thereafter passed and adopted at a regular meeting of the City Council of the City of Brisbane held on the ________ day of ____________________, 2026, by the following vote:

AYES:

NOES:

Page 41 of 151 ends

Attachment 3

Page 59 of 169 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2
4 ABSENT:

ABSTAIN: _____________________________
Mayor Coleen Mackin
ATTEST:
_____________________________
City Clerk
APPROVED AS TO FORM:
___________________________
City Attorney

Page 42 of 151 ends

Attachment 3

Page 60 of 169 ends

Attachment 3

EXHIBITA
Visitacion
Valley
Baylands Specific Plan Zoning District
Proposed update to current Zoning Districts
C/P-U
Proposed Baylands Specific Plan District
Baylands Specific Plan Distrit
Proposed BSP BSP Z (to replace Current Zoning Districts)

DISTRICT
Current Zoning Districts
immers Med-lee Dismal
CP-u Commerdal/Public Utiltes District
Heavy Commerdal Distric
Menufacturing District
March nacon Bayrort Disrid

O-S NERO-T
Proposed BSP PAOZ-1 Parkade Overlay District - Custored Housing PAOZ-2 Parkade Overlay District - MultiFamily Housing

DISTRICT
R-1 Rachs Torr
Restarts Disrid
Resdential District
Bishane Acres Residential Distrit
R-MHP Restental Mobile Home Park District
R-TUO Resential Two Unit Overlay District
SERO-1 Soutwest Bayahore Commere Dorid
SP-CRO Sara Part formers Distic
Coder Park Tade Commendal Dstrict
TC-2 Southeast Bayshore Commerda District
PAOZ-2 PAGZ-1
NCRO-1
NCRO-2
BIR:3
Southeas
'R-TUO
TC-2
SCRO-1

Page 43 of 151 ends
Page 61 of 169 ends

SP-CRO
Matis de Blue
наводе віз
Sisters Cities Bles
Sicters Cities Rivd

Page 632010189 ends

Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2

EXHIBIT D
Brisbane General Plan Land Use Element Amendments

Page 44 of 151 ends

Attachment 3

Page 62 of 169 ends

Includes Updates Adopted by City Council in October 2017, November 2017, January 2018, and January 2020 Resolutions 2017-50, 2017-51, 2018-01, 2018-62, and 2020-01

CHAPTER V

LAND USE
GOALS:

The City of Brisbane will...

Preserve the Mountain for its own sake and
as the symbol of the unique character and
identity of the City;
Incorporate and reflect the natural
environment as an integral part of land use;
Celebrate diversity as essential to the physical
character of the City;
Incorporate a mix of land uses to best serve
its citizens; and
Design infrastructure and public facilities to
be efficient, cost-effective and to contribute to
the cohesion and character of the
DRAFT
community.

Page 45 of 151 ends

Attachment 3

Page 63 of 169 ends

DRAFT

Page 46 of 151 ends

Attachment 3

Page 64 of 169 ends

V-1

LAND USE
Chapter Index
Page
V.1 History of Land Use and Subdivision ........................................................................... V-2 Land Use History .......................................................................................................V-3 History of Subdivision Patterns.................................................................................V-4 V.2 The General Plan Land Use Map and Land Use Designations .....................................V-7 The General Plan Land Use Map ..............................................................................V-7 Land Use Designations..............................................................................................V-7 V.3 Density and Intensity Standards ....................................................................................V-12 Population Density.....................................................................................................V-13 Building Intensity.......................................................................................................V-13 V.4 Land Use Policies ..........................................................................................................V-17 General Principles .....................................................................................................V-17 Bay and Mountain Setting .........................................................................................V-18 Nature and Character of Development .....................................................................V-19 Open Areas.................................................................................................................V-21 Streets ........................................................................................................................V-24 Subdivision Pattern ...................................................................................................V-25 DRAFT

Page 47 of 151 ends

Attachment 3

Page 65 of 169 ends

V-2
DRAFT

Page 48 of 151 ends

Attachment 3

Page 66 of 169 ends

V-2

CHAPTER V

LAND USE
Question: In your opinion, what is the most important
problem that Brisbane residents will have to face and try to solve over the next ten years?
Respondents: "Development of lands currently vacant, to make certain they contribute and not
diminish the quality of life."
"Managing growth to keep our
independence."
"The Mountain. Save it."
General Plan Issues Questionnaire (GP-5)
Citizens who know and love the City will often explain that to understand Brisbane it is necessary to read the oral histories. A look to the past makes it clear that the City was incorporated as a defense against development that would have destroyed San Bruno Mountain and the quality of life of the community that had become established there. The passion for self-determination remains one of the most essential values of this community. This Land Use chapter begins with a look at the history of land use and subdivision patterns in the planning area.

This update of the General Plan provides an opportunity to reaffirm that Brisbane will control its destiny. If development is to occur, this community will set the standards. And the basis for these standards are the land uses and policies in the General Plan.

A General Plan usually includes an illustration of the general location of land uses on a map.

Figures LU-1 and LU-2 constitute the Land Use Map for the Brisbane General Plan. These land uses are categorized into land use designations, and this chapter includes a narrative description of each land use designation shown on the Land Use Map. Table 1 within this chapter describes the density and intensity of future planned land uses. The chapter closes with land use policies and programs, which describe how these land use designations are to be implemented. The policies in this section for the most part apply on a city-wide basis. Land use policies and programs specific to each of the subareas are found in Chapter XII.

V.1 HISTORY OF LAND USE AND SUBDIVISION
Land uses in Brisbane are well-established in many subareas of the City. In others, remainders of prior uses provide either opportunities or constraints to contemporary uses of the land. Land subdivision patterns in Brisbane have varied from one subarea to the next, depending on land DRAFT

Page 49 of 151 ends

Attachment 3

Page 67 of 169 ends

V-3
use, topography, property ownership, and zoning regulations affecting lot sizes. The following is a brief chronological history of land use in the City, followed by an overview of the City's subdivision patterns.

Land Use History
Although the earliest recorded land use in the area that is now the City of Brisbane was ranching, archaeological remains indicate that this land was once a home to the Costanoan Tribe of Native Americans. The Guadalupe Valley, within which Central Brisbane, Crocker Park and the Northeast Ridge are now located, was part of the 1838 Mexican land grant known as Rancho Canada de Guadalupe la Visitacion y Rodeo Viego. Charles Crocker purchased most of this land grant in 1884 and called it Visitacion Ranch. In 1895, a section of the ranch was leased as a quarry, which operates to this day.

In the early 1900s, a small amount of urban development could be found in the area of Bayshore Boulevard and Geneva Avenue, in what is now the vicinity of the Northwest Bayshore subarea.

The 7-Mile House, a bar and grill established in 1853 and still operating today, served travelers along Bayshore Boulevard, which was one of the main thoroughfares connecting San Francisco with points south. A gas manufacturing plant, which evolved into what is now the Pacific Gas & Electric Company's Martin Service Center and Substation, operated from 1905 to 1916 in the area of Bayshore and Geneva, now a part of Daly City. Across Bayshore Boulevard on what is now known as the Baylands subarea, the Southern Pacific Railroad maintenance and switching yard was built atop rubble from the 1906 San Francisco Earthquake that was used to fill a portion of the Bay. The use of the yard began to decline in the 1960s and was mostly idle when Southern Pacific sold the yard and surrounding land and structures in 1989 to Universal Paragon Corporation. The land had featured a number of substantial industrial structures only a few of which remain, including the Roundhouse, one of the few of its kind still standing and which is designated a historic resource on the National Register of Historic Places.

Residential development in what is now Brisbane also began to appear early in the century. The area of the Guadalupe Valley that is now Central Brisbane experienced a small amount of residential construction between 1908 and 1929. The most notable of the early residences in what was then known as the "City of Visitacion" is the Allemand Hotel, currently an apartment building at the corner of San Bruno Avenue and Mariposa Street. In 1929 the name of the settlement was changed to Brisbane. In the 1930s, during the Depression, the residential area boomed due to its affordability, with a commercial core developing along Visitacion Avenue.

This residential area has continued to grow to the present and, to a limited degree, has extended into the lowest lying portions of the largely vacant Brisbane Acres.

The 1930s also saw an intensification of garbage dumping into the Bay in the portion of the Baylands subarea east of the Southern Pacific railroad tracks. Starting from the north, dumping continued southward until it was finally stopped in the 1960s at the edge of what is now the Brisbane Lagoon. The Recology complex of refuse transport and recycling facilities, located in the Beatty Subarea at the Brisbane-San Francisco border, is an active successor to this past use.

Since the 1940s, a variety of uses has developed atop the oldest part of the landfill, including lumber yards and warehouse buildings.

DRAFT

Page 50 of 151 ends

Attachment 3

Page 68 of 169 ends

V-4
Although Bayshore Boulevard was a major thoroughfare connecting San Francisco with points south until Highway 101 was constructed in 1954, only limited development occurred along its frontages. In the 1940s, a small amount of residential development occurred along the west side of southern Bayshore Boulevard in the subarea now known as Southwest Bayshore. In the decades that followed, some commercial uses, such as retail, service and warehousing, intermixed with the residential uses, including a mobile home park.

The 1960s saw a flurry of industrial development, which continued into the early 1980s. In 1959, construction of Crocker Park began on the grazing lands of the floor of the Guadalupe Valley and adjacent wetlands, just north of Central Brisbane; the final phase of construction in Crocker Park was completed in the early 1980s, and Crocker Park was annexed to the City in 1983. In the 1960s, VWR Scientific first occupied a large office/warehouse building on the east side of southern Bayshore Boulevard; a second office/warehouse complex was added in the Southeast Bayshore subarea in 1981. First subdivided in 1969, the Brisbane Industrial Park, consisting mostly of metal buildings for warehouse, office and manufacturing uses, was constructed along Industrial Way in what is now the westerly edge of the Baylands subarea. The late 1960s also saw the development on the Baylands of the Southern Pacific Pipelines Brisbane Terminal, located on the leveled portion of Visitacion Point, with a privately constructed extension of Tunnel Avenue including an overcrossing connecting to Bayshore Boulevard.

Commonly referred to as the "Tank Farm," the facility and adjacent buildings provide fuel distribution services for the Peninsula and San Francisco International Airport.

Office and commercial development increased in the 1980s. Construction of the Brisbane Village shopping center began in 1979 at the entrance to Central Brisbane. This single structure shopping center contains approximately 20 storefronts and office spaces occupied mostly by retail businesses and professional offices. East of Highway 101 at Sierra Point, several buildings of the Sierra Point Office Park and the Brisbane Marina were constructed during the 1980s on a peninsula of engineered landfill that was closed in 1972.

In 1989, a multi-phased residential project, including open space for conserved habitat, was approved for the Northeast Ridge of San Bruno Mountain. The project includes 499 residential units and was completed in phases from the late 1990’s through 2015. In 1989, the Wildlife Conservation Board, a division of the State Department of Fish and Game, purchased Owl and Buckeye Canyons as an ecological reserve. They remain essentially in their natural state.

Brisbane citizens, staff and local environmental organizations worked with the Trust for Public Land to accomplish this acquisition, which added to the permanent open space established by the creation of San Bruno Mountain State and County Regional Park in the late 1970s.

History of Subdivision Patterns
The following describes the history of the subdivision of land in Brisbane by subarea.

Following adoption of the General Plan, zoning and subdivision regulations will be reviewed to determine if amendments should be made to conform to General Plan policy.

Sierra Point. The Sierra Point subarea was master planned and subdivided between 1981 and 1987, which resulted in the current configuration of typically 5 to 10 acre parcels. This pattern is consistent with the 1 acre minimum parcel size requirement which has been in effect since 1984.

DRAFT

Page 51 of 151 ends

Attachment 3

Page 69 of 169 ends

V-5
Southeast Bayshore. The Southeast Bayshore subarea was subdivided in 1979 into two parcels, one 4 acres in size and the other 11 acres. This is consistent with the 10,000 sq. ft. minimum parcel size requirement in effect since at least 1969.

Southwest Bayshore. The steep hillsides of the Southwest Bayshore subarea were first sold off as typically 11,900 sq. ft. unrecorded lots in the 1930s. Each of the original lots fronted on what was then known as the Bayshore Highway, hence their name, the "Highway Lots." Subsequent lot subdivisions reduced some of these lots to areas as small as approximately 3,000 sq. ft.

Regulations, which date back at least to 1969, established a 7,500 sq. ft. minimum lot size in the subarea.

Brisbane Acres. The Brisbane Acres subarea originated as an unrecorded subdivision in the 1930s. As the name implies, unrecorded lots were typically an acre in size. Subsequent land transfers by deed description resulted in individual ownerships, some with areas of less than 5,000 sq. ft. In 1980, regulations were adopted that set a 20,000 sq. ft. minimum lot size. Parcel maps have been recorded for some of the previously unrecorded lots to allow for development.

These are in the lower Brisbane Acres areas, close to public infrastructure.

Central Brisbane. In 1908, the American Realty Company subdivided the area that is now Central Brisbane into small residential lots. These lots were typically 25 feet wide and 100 feet deep, but in many instances lot dimensions were adjusted to fit the subarea's bowl-like terrain.

Many of the lots were subsequently developed in pairs, some as three or more lots combined, and a few as one and a half lots. The current regulations requiring 5,000 sq. ft. minimum lot size for residential districts and 2,500 sq. ft. minimum for non-residential date back at least as far as the City's original Zoning Ordinance, adopted in 1969.

Parkside Area. The Parkside Area is an approximately 25-acre area located between Crocker Industrial Park and Central Brisbane subareas. The Parkside Area is comprised of 11 properties developed with neighborhood commercial, retail, and office, public facilities and parks, and trade commercial uses. Vital community assets in the Parkside Area include the City’s two primary entrances via Valley Drive and Old County Road, as well as the Brisbane Village Shopping Center, Community Park, Brisbane Skate Park, and public basketball courts. The Parkside Area was established by the Parkside at Brisbane Village Precise Plan, the culmination of two-year community visioning and planning process from 2015-2017 to implement the City’s 2015-2022 Housing Element, which designated sites within the Parkside Area subarea for potential residential development.

Crocker Park. Most of the Crocker Park subarea was subdivided in three phases of the Park's development, recorded in 1959, 1965 and 1968. The subdivision of North Hill Drive followed in 1980. Subsequent parcel splits and mergers have resulted in lots ranging in size from 0.56 to

13.23 acres. Current regulations require a 10,000 sq. ft. minimum lot size.

Northeast Ridge. The Northeast Ridge remained unsubdivided until it was recorded as a single parcel in 1975. The vesting tentative subdivision map for the planned development approved in 1989, as subsequently modified, divided the subarea into single-family residential lots (an average of 7,400 sq. ft. each), clusters of condominiums and townhouses (totaling approximately 39 acres), and large tracts of open space.

DRAFT

Page 52 of 151 ends

Attachment 3

Page 70 of 169 ends

V-6
Northwest Bayshore. The existing irregular pattern of large parcels in the Northwest Bayshore subarea can be traced back to subdivision maps recorded as early as 1915. The subarea is built out with the PG&E Martin substation and 7 Mile House properties.

Guadalupe Hills. The Guadalupe Hills subarea was part of the Northwest Bayshore subarea until 2018, at which time it was designated as a separate General Plan subarea to reflect its different character, as vacant sites, separate from the PG&E substation to the north. It shares the same early subdivision history with Northwest Bayshore.

Baylands. The Baylands subarea is largely unsubdivided, a vestige of the once extensive holdings of the Southern Pacific Transportation Company. Major portions of these holdings located in Brisbane are now owned by Universal Paragon Corporation. The Brisbane Industrial Park portion of the Baylands was established via subdivision in 1969. Lot sizes ranged from

0.23 to 5.663 acres, although subsequent consolidations of ownership have increased the average building site size. The Industrial Park is now under the ownership of UPC and is slated for redevelopment as part of the larger Baylands specific plan. There are parcels in other ownerships scattered throughout the subarea, ranging from approximately 5,000 sq. ft. to 230,000 sq. ft. in size.

Beatty. The Beatty subarea is a haphazard collection of parcels, reflecting a varied history of ownerships. Parcel sizes are generally from 0.176 to 7.043 acres. Most of the properties within this subarea are under the ownership of Recology.

Owl and Buckeye Canons. The Owl and Buckeye Canyons subarea consists of four parcels of land sold by the owners of the Quarry to the California Department of Fish and Game in 1989.

Quarry. The Quarry subarea is divided into four parcels ranging in size from approximately 1.5 to 135 acres.

DRAFT

Page 53 of 151 ends

Attachment 3

Page 71 of 169 ends

V-7
V.2 THE GENERAL PLAN LAND USE MAP AND LAND USE DESIGNATIONS The General Plan Land Use Map
The land use map for the General Plan (Figures LU-1 and LU-2) illustrates the general location of the land use designations given to both public and private properties within the General Plan planning area. For purposes of clarity, the map has been divided into the 14 subareas described earlier in this text. The land use designations used in the map are described below.

Land Use Designations
The descriptions of the General Plan land use designations that follow are broadly drafted, as befits the intent of a General Plan. Specificity of land use by district is the province of the City's Zoning Ordinance. After adoption of a General Plan, the zoning map and zoning district regulations are analyzed to determine whether changes are necessary to conform to the adopted General Plan land use designations and policies.

Commercial/Retail/Office Designations
Neighborhood Commercial/Retail/Office (NCRO) designates a subarea devoted to a range of local retail and service uses, including shops, restaurants, medical, professional and administrative offices and other uses of the same general character. Public and semipublic facilities may be located under this designation. Residential uses may be permitted conditionally in implementing zoning districts. Portions of Central Brisbane and Parkside Area subareas are designated NCRO in the General Plan.

Subregional/Commercial/Retail/Office(SCRO) designates a subarea devoted to subregional retail uses, personal services, restaurants and offices. Public and semi-public facilities and educational institutions may be located under this designation. Commercial recreation, residential uses, warehouse and distribution facilities, research and development, and light industrial uses may be permitted conditionally in implementing zoning districts. The Guadalupe Hills and Southwest Bayshore subareas are designated SCRO. The Guadalupe Hills also has a Planned Development designation, that includes a Specific Plan requirement.

Sierra Point Commercial/Retail/Office (SPCRO) represents a subarea devoted to commercial enterprises, encompassing a wide range of uses, as outlined in the Development Agreement for Sierra Point. Such uses may include, but not be limited to, retail uses, personal services, medical, professional and administrative offices, corporate headquarters, hotels, conference centers and cultural facilities, commercial recreation, restaurants, and other uses of a commercial character. Public and semi-public facilities and educational institutions may be located under this designation.

Heavy Commercial (HC) provides for bulk sales, offices, meeting halls, vehicle storage and equipment maintenance. It also allows outside storage of vehicles and equipment. No materials storage, other than that associated with bulk sales and no processing of materials are permitted. Subareas designated Heavy Commercial are required to have an adopted specific plan to guide development in the area. The Beatty subarea is designated HC in the General Plan.

DRAFT

Page 54 of 151 ends

Attachment 3

Page 72 of 169 ends

V-8
Marsh
.

Crocker Park
-Ballpark
•Lipman Middle School
• Bayshore Blvd Fire Station
- CommunityPark
\/Valkwav
-Park and Ride Loi
• Fisherman's Park
-Plug Preserve
9-IJ\t:;llkway
10 • Skalepark & Basketball Courts
Center
W!lkWay
Firth Park
Fishlt"QPier
17 -Linear Park
:
.'
JI
16 '
Bris6ane Acres
L ..........._ .....

I
0 0.125 0.25 0.5 0.75
Figure LU - 1 Land Use Diagram
Residential
Brisbane Acres Residential (0-2 OU/Acre} R
Central Brisbane Residential (2.5-14 DU/Acre) R
Central Brisbane Residential (15-30 DU!Acre} R
Mixed Use
D Neighborhood Commercial/Retail/Office NC/R/O
EJ] Parkside Residential - Trade Commercial (20-28 DU/Acre)' PR - TC SubregionalCommercial/Retail/Office S C/R/O
other
Commercial Public Utilities CPU
D Public Facilities and Parks PFP
Open Space OS
Marsh/Lagoon/Bayfront M/L/8
Commercial
Sierra Point Commercial/Retail/Office SP C/R/O
D Trade Commercial TC
Heavy Commercial HC
Planned Development
Quarry Planned Development - Trade Commercial PD -TC
D Guadalupe Hills Planned Development - Subregional Commercial/Retail/Office PD-S CIR/O D Baylands Planned Development - NonResidential PD - NR Baylands Planned Development - Residential Permitted PD - RP Northeast Ridge Planned Development - Residential.. NER - PD - R (Landmark: 5 DU/Acre, Viewpoint: 10 DU/Acre, Altamar: 15 DU/Acre) Parkside residential density is by Precise Plan, as an overlay district within Crocker Park.

Northeast Ridge residential density is as established in the Planned Development Permit DU/Acre = Dwelling Units per Acre
[::JBrisbane City Limits
� Sphere of Influence Outside Brisbane City Limit
Replace with new Land Use Map
DRAFT
,r- •• City,!'"' _ - - - - - - - - - - - •
. ,-..... i
: "'"' •'
/Guaa upe\
i:=:: J:lllla
ID V.llly 0,
f!

Page 55 of 151 ends

Attachment 3

Page 73 of 169 ends

V-9
Figure LU - 2: Detail Central Brisbane
Residential
Brisbane Actes Residential (0-2 DU/Acta) R
- Central Brisbane Residential (2.5-14 DU/Acre) R
- Central Brisbane Residential (15-30 DU/Aa-e) R
Mixed Use
LJ Neighborhood Commercial/Retail/Office N CJR/O
S Parkside Residential - Trade Commercial (20-28 DU/Acret PR - TC Commercial
LJ Trade Commercial TC
Planned Development
LJ Baylands Planned Development - NonResidential PD - NR Public Facilities and Parks
2 - Lipman Middle School
3 - Bayshore Blvd Fire Station
4 - Community Park
5- Walkway
6 - Park and Ride Lot
8 - Plug Preserve
9 - Walkway
10 - Skatepark & Basketball Courts
11 - Library
12 - Community Center
13 - Walkway
14 - Brisbane Elementary School
15 - Firth Park
Other
LJ Public Facilities and Parks PFP
- Open Space OS
LJ Marsh/Lagoon/Bayfront MIUB
(::J Brisbane City Limits
� Sphere of Influence Outside Brisbane City Limit
250 500 1,000 t,500
••c::::::::i••c::::::::i:::::i:::::i:::::i:::::i••••••Feet S1tplamber 9, 2019
.f..
16 DRAFT
Brisbane Acres
--,
TC
1112 /
+
€antral Brisbane
R
PFP
~

Page 56 of 151 ends

Attachment 3

Page 74 of 169 ends

V-10
Marsh/Lagoon/Bayfront (M/L/B) are aquatic areas designated by type.

The following subareas contain designated aquatic areas:

Northwest Bayshore: Marsh
Baylands: Lagoon, Bayfront
Beatty: Bayfront
Sierra Point: Bayfront
Open Space (OS) designates properties that have been purchased, given or offered for dedication to a public agency for open space use or conservation purposes and are essentially unimproved by urban structures. The following subareas contain open space designations:

Central Brisbane: Costanos and Firth Canyons
Northeast Ridge: Conserved Habitat
Owl and Buckeye Canyons: Ecological Preserve
Quarry: Conserved Habitat
Southwest Bayshore: Remainder of the Bayshore Boulevard right-of-way Planned Development (PD ) designates subareas that are primarily vacant and that present unique development constraints. Subareas designated PD may be combined with other land use designations and/or site specific uses may be included in this Plan to guide the development of implementing zoning district regulations. Subareas designated PD require a specific plan and environmental impact report prior to any development of the property. A minimum of 25% of the surface land of any subarea designated Planned Development shall be in open space and/or open area.

There are three subareas designated PD:

Guadalupe Hills: Planned Development-Subregional Commercial/Retail/Office This subarea was established in 2018. See the SCRO designation for more information regarding future land uses in this area.

Baylands: Planned Development
The July 2018 amendment to the General Plan approved by the voters via passage of Measure JJ in November 2018 (Case GP-1-18) modified the General Plan by defining permitted uses and development intensities for the Baylands as noted below.

The Baylands subarea provides for a transit-oriented variety of residential, employment- and revenue-generating uses; natural resource management; and public and semi-public facilities. A range of 1,800-2,200 dwelling units (the upper range of which shall not exceed all units permitted under the State density bonus or other law providing for affordable housing), up to 6.5 million square feet of new commercial development, with an additional 500,000 square feet of hotel development is permitted. Non-residential development shall be distributed both to the west and to the east of the rail line. Residential uses shall be permitted only in the northwest quadrant of the site bounded by Bayshore Boulevard on the west, the City and County of San Francisco on the north, the Caltrain rail line on the east, and the line of Main Street (extended) DRAFT

Page 57 of 151 ends

Attachment 3

Page 75 of 169 ends

V-11
on the south as shown on the General Plan Land Use Diagram. Additional standards for the future development of the Baylands and roundhouse rehabilitation are described further in the Baylands subarea section of the General Plan.

Quarry: Planned Development - Trade Commercial
The following mix of uses would be considered under the Planned Development-Trade Commercial designation for the Quarry subarea:

Open Space
Long-term Health Care Facilities
Educational Facilities
Commercial Recreation
Trade Commercial
Research and Development
Single-family housing is not included due to safety and environmental sensitivities. The need to further examine the environmental characteristics of this subarea prior to the establishment of trade commercial uses is set forth in the following policy:

Policy LU.1 Require the highest level of environmental analysis of the Quarry subarea to disclose the characteristics of the land and its suitability to accommodate new uses.

Public Facilities and Parks (PFP) are outdoor spaces and buildings owned or leased by public agencies, including City parks, police and fire stations, schools and libraries. This designation does not include infrastructure.

The following subareas contain Public Facilities and Parks:

Sierra Point: Marina, Fishing Pier, Linear Park
Central Brisbane: Brisbane Elementary School and grounds, Lipman Intermediate School and grounds, Firth Park, San Bruno Avenue Fire Station Site, Community Center, Library and Park, Bicentennial and other Walkways, Plug Preserve Parkside: Community Park, skate park, basketball courts Northeast Ridge: School/ Park Site
Baylands: Bayshore Boulevard Fire Station, Park and Ride Lot, Fisherman's Park Residential (R) includes single- and multi-family areas and planned residential developments.

The subareas designated residential and the range of residential densities in the General Plan are:

Brisbane Acres: 0 - 2 units per acre
Central Brisbane: 2 1/2 - 14 units per acre and
15 - 30 units per acre
Northeast Ridge: 6.23 units per acre
DRAFT

Page 58 of 151 ends

Attachment 3

Page 76 of 169 ends

V-12
As discussed throughout this section there are several other subareas not formally designated residential which allow for residential uses. The Baylands subarea allows for a range of 1,800- 2,200 residential units in the northwesterly corner of the subarea. The Parkside Residential and Trade Commercial (PRTC) subarea allows for a minimum of 228 residential units. Residential uses are also permitted in subareas designated NCRO and SCRO.

Commercial/Public Utilities (C/P-U) represents a mix of commercial and public utility uses. It includes uses such as utility substation facilities and associated warehouse, maintenance and office uses as well as private commercial uses.

Trade Commercial (TC) represents a mix of commercial uses including warehouses, distribution facilities, offices, retail uses, restaurants, commercial recreation, personal services, as well as light industrial, research and development, and uses of a similar character. Public and semi-public facilities and educational institutions may be located under this designation. Repair and maintenance services, such as auto body repair shops, may be conditionally permitted in the implementing zoning districts. In such districts, certain individual or groups of uses may predominate, thus distinguishing the districts one from the other. In the General Plan, Crocker Park and Southeast Bayshore are designated TC. Also see Parkside Residential and Trade Commercial designations.

Parkside Residential and Trade Commercial (PRTC) includes single-family and multi-family residential developments and trade commercial uses, as allowed under the Trade Commercial land use designation. For the Parkside Area subarea, the densities applied will result in a minimum of 228 dwelling units. Residential development in the Parkside Area is subject to compliance with the development standards and design guidelines established by the Parkside at Brisbane Village Precise Plan, adopted by the City Council in 2017.

The range of residential density for the Parkside Residential and Trade Commercial designation is 20-28 units per acre.

V.3 DENSITY AND INTENSITY STANDARDS
The Government Code requires that a General Plan include an indication of density and intensity of use for the land use designations in the Plan. The language of the Code reads:

GC 65302(a): The land use element shall include a statement of the standards of population density and building intensity recommended for the various districts and other territory covered by the plan.

These standards represent overall policy objectives that are implemented through the zoning district regulations. General Plan standards represent broad ranges, whereas zoning regulations establish specific development standards, such as height limits, setbacks, coverage and site area, that must fall within the General Plan range. After adoption of a General Plan, the zoning districts are reviewed and amended, as necessary, to bring them into consistency and best reflect the policy direction of the Plan.

DRAFT

Page 59 of 151 ends

Attachment 3

Page 77 of 169 ends

V-13
Population Density
The populations that can be expected in an area on a predictable, daily basis for the land use designations in this Plan are represented in Table 1. For the residential designations in the General Plan, population is given in terms of number of residents and for nonresidential designations, by number of employees. The residential density is based on the number of housing units per acre and the average household size identified in the 1990 Census.(1) For non-residential land use designations, the number of employees per 1,000 square feet of floor area is used. These numbers represent common standards employed for economic analysis.(2) Because the General Plan land use designations contain a range of uses, employee population density is expressed in ranges.

Building Intensity
The range of building intensity for the various residential land use designations in the General Plan is listed in Table 1. The intensity is expressed in terms of units per acre.

Building intensity for non-residential designations is expressed in a floor area ratio (FAR) formula. The formula relates the square footage within a building to the acreage upon which it sits. A floor area ratio is a very general indicator which must be further defined in zoning district regulations before any development can occur.

The Baylands, Quarry and Guadalupe Hills Subareas are designated Planned Development because these subareas require extensive site investigation and planning before the most beneficial development patterns can be determined. The policies in Chapter XII require, for each of these subareas, a specific plan and environmental impact report before any development can occur. Until these studies are completed and new information evaluated that can be used to refine the FAR standards, the FARs given in Table 1 represent standards that are comparable to those of subareas with similar uses and environmental constraints.

Specific plans for the Baylands shall distinguish between the areas north and south of the Bayshore Basin drainage channel as shown in Table 1 and further described below:

Policy LU.2: Development south of the Bayshore Basin drainage channel shall maintain a low profile, permitting low or mid-rise buildings, not to exceed six stories in height, in order to preserve the existing views of San Francisco and San Francisco Bay as seen from Central Brisbane, and to maximize the amount of landscape and open space or open area in this portion of the subarea.

It should be noted that the intent of the FARs density/intensity given for the Baylands in Table 1 is to accommodate diversity in the height and intensity of structures in order to encourage interesting, flexible and variable development. In no event shall the FARs shown in Table 1 be interpreted as permitting the maximum intensities to be established throughout the subarea. The City will expect specific plans to emphasize intensities well below those figures. See Program BL.4.b for further direction addressing the design of buildings and building groups in the Baylands.

DRAFT

Page 60 of 151 ends

Attachment 3

Page 78 of 169 ends

V-14
TABLE 1
GENERAL PLAN: LAND USE DESIGNATIONS AND DENSITY/INTENSITY BY SUBAREA

SUBAREA LAND USE DESIGNATION POPULATION DENSITY

NUMBER OF UNITS/

MAXIMUM FLOOR AREA
RATIO

MINIMUM OPEN SPACE/

OPEN AREA
l. Sierra Point Sierra Point
Commercial/Retail/Office

1.66 - 3.22 E/1,000

1.65 per hotel room

4.8 FAR Development Agreement
0 0 100%

2. Southeast Bayshore Trade Commercial 1.23 - 3.22 E/1,000 2.0 FAR Per Zoning Requirements

3. Southwest Bayshore Subregional
Commercial/Retail/Office 1.66 - 3.22 E/1,000 2.8 FAR Per Zoning Requirements Open Space 0 0 0

4. Brisbane Acres Residential 0 - 4.48 ppa 0 - 2 units/acre 40% per HCP + per Zoning Requirements

5. Central Brisbane Residential 5.6 - 31.36 ppa 2 1/2 - 14 units/acre Per Zoning Requirements

33.6 - 67.2 ppa 15 - 30 units/acre Per Zoning Requirements Neighborhood Commercial/
Retail/Office 1.66 - 3.22 E/1,000 2.4 FAR Per Zoning Requirements Open Space 0 0 100%
6472033.1
DRAFT

Page 61 of 151 ends

Attachment 3

Page 79 of 169 ends

V-15
TABLE 1: GENERAL PLAN: LAND USE DESIGNATIONS AND DENSITY/INTENSITY BY SUBAREA

Page 2 ends

6. Parkside Area
Parkside Residential and Trade
Commercial, Trade Commercial,
Neighborhood
Commercial/Retail/Office,
Public Facilities and Parks

44.8 – 62.72 ppa

1.23 – 3.22 E/1,000
20 - 28 units/acre

2.0- 2.4 FAR Per Zoning Requirements

7. Owl and Buckeye Canyons Open Space 0 0 100%

8. Quarry Planned Development -
Trade Commercial 1.23 - 3.22 E/1,000 2.0 FAR 25% minimum Open Space 0 0 100%

9. Crocker Park Trade Commercial 1.23 - 3.22 E/1,000 2.0 FAR Per Zoning Requirements

10. Guadalupe Hills
Planned Development -
SubregionalCommercial
Retail / Office

1.66 - 3.22 E/1,000 2.8 FAR Per Specific Plan ,25% minimum Marsh 0 0 100%
Open Space 0 0 100%

11. Northeast Ridge Residential 11.2 – 33.6 ppa 5 - 15 units/acre* Per Development Plans Open Space 0 0 100%

12. NorthwestBayshore Commercial/Public Utilities 1.66 - 3.22 E/1,000 2.8 FAR Per Zoning Requirements DRAFT

Page 62 of 151 ends

Attachment 3

Page 80 of 169 ends

V-16
TABLE 1: GENERAL PLAN: LAND USE DESIGNATIONS AND DENSITY/INTENSITY BY SUBAREA

Page 3 ends

13. Baylands Planned Development- 4,032-4,928 residents

1.23 - 3.22 E/1,000
1,800-2,200 dwelling units
Increase of up to 6.5 million square
feet of non-residential building area
with an additional 500,000 square
feet of hotel development
south of channel** 0-2.4
FARnorth of channel** 0-4.8 FAR,
per Specific Plan. See Baylands
Specific Plan for further details.
25% minimum
Bay-front 0 0 100%
Lagoon 0 0 100%

14. Beatty Heavy Commercial 0 - 1.23 E/1,000 0 - 1.0 FAR Per Specific Plan Bayfront 0 0 100%
ppa = persons per gross acre
E/1,000 = employees per 1,000 s.f. of building floor area * 125 single family, and 160 townhouses approved and built. ** See Policy LU.2.
*** Minimum open space/open area in Crocker Park is per zoning requirements, except the Technology Park north of Guadalupe Canyon Parkway is also part of the San Bruno Mountain Habitat Conservation Plan (HCP) and future site modifications are to be evaluated for consistency with the HCP.

DRAFT

Page 63 of 151 ends

Attachment 3

Page 81 of 169 ends

V-17
V.4 LAND USE POLICIES
Question: What do you like most about living in Brisbane:

Respondent: "I like the "touch of country in the City"
atmosphere. I like the naturalness of the canyons in which we live--seeing the beauty of the Mountain at all
hours...The quietness of Brisbane, its peace, are beautiful.

The community is close, vital and neighborly. Care and
concern about the type of development, building codes and quality of life is important ... Let's uphold a strong
standard, high quality of life."
General Plan Issues Questionnaire (GP-5)
The combination of land uses, topography, natural features, subdivision patterns, streets, buildings, landscape, open areas and open spaces makes up Brisbane's physical character. The following pages contain policies and programs pertaining to both the mix of land uses and the physical character of the community. Policies are grouped under six headings: General Principles, Bay and Mountain Setting, Nature and Character of Development, Open Space and Open Areas, Streets, and Subdivision Patterns.

General Principles
Policy LU.3 Establish a mix of land uses that best serves the needs of the community.

Program LU.3.a: When evaluating land uses, consider whether a use would result in adverse impacts on existing and proposed land uses nearby, and whether those impacts can be mitigated.

Policy LU.4 Integrate physical, social, environmental and financial elements of the community for the benefit of current and future residents.

Policy LU.5 Establish a mix of uses with a diversified economic base to maintain and increase tax revenues and contribute to the City's ability to provide services.

Policy LU.6 Adopt development standards which protect and enhance the quality of life in Brisbane.

Program LU.6a: When drafting development standards, consider preserving a sense of openness in the design of structures and sites and the access to sky and sunlight for both new construction and renovation projects.

DRAFT

Page 64 of 151 ends

Attachment 3

Page 82 of 169 ends

V-18
Policy LU.7 Enhance communications and information sharing with adjacent jurisdictions at early stages of project development in order to address issues of mutual concern.

Bay and Mountain Setting
Policy LU.8 Acknowledge the mountain setting and the proximity to the Bay as central factors in forming the physical character of the City.

Program LU.8.a: In making land use decisions, consider the proximity of open space on San Bruno Mountain and public views of and access to the Bay as issues to be addressed.

Policy LU.9 Preserve the ridgelines and hilltops in their open state.

Program LU.9.a: Prohibit land use changes that would result in development that would break the natural ridgeline.

Program LU.9.b: Adopt hillside development standards that protect against ridgeline development through regulation of the siting of structures, location of access, landscape requirements and other pertinent factors.

Policy LU.10 Respect the topography of the Mountain in design and construction.

Program LU.10.a: In conjunction with land use development applications, encourage options that minimize grading and transformation of the landform and fit comfortably with the topography.

Policy LU.11 In the context of respecting private property rights, make every effort to preserve and enhance public views of the Mountain and the Bay.

Program LU.11.a: Identify and map vistas and view corridors of community-wide value to be preserved and enhanced.

Program LU.11.b: Consider amendments to the Zoning Ordinance to provide for site plan review to assure that identified vistas and public view corridors remain accessible for public enjoyment. The review should evaluate building placement, height and bulk.

Program LU.11.c: In reevaluating the tree protection ordinance and landscaping requirements, consider the trade-off between desirability of foliage versus the DRAFT
preservation of views and access to sunlight.

Page 65 of 151 ends

Attachment 3

Page 83 of 169 ends

V-19
Nature and Character of Development
The diversity of structures in Brisbane is central to the existing physical character of the City. It is a reflection of a City that developed lot by lot, of many different hands building to meet individual needs over the years. It is in the nature of cities that structures are built, changed, demolished and rebuilt as the years go by, and that demographic changes, economic factors, safety standards and personal preference affect the size, scale and appearance of development, as well as building codes and zoning standards.

The following policies emphasize Brisbane's desire to retain and continue to encourage diversity and individual expression as changes occur in the built environment, while encouraging quality construction and the upgrading and on-going maintenance of existing structures.

Policy LU.12 Retain diversity of development and individual expression in residential and commercial development, especially in Central Brisbane.

Program LU.12.a: Review the R and C-2 District regulations to ascertain if amendments would help preserve the diversity of existing development.

Program LU.12.b: Consider amendments to the Zoning Ordinance to prohibit issuance of a building permit for a single family dwelling on a lot of record when the design is essentially the same as that on any immediately adjacent lot.

Policy LU.13 Respect Brisbane's vernacular architectural heritage.

Policy LU.14 Provide clear performance standards in the Municipal Code for the physical character of all land use developments on private property.

Program LU.14.a: Consider amendments to the Zoning Ordinance which contain clear and defined standards to protect creativity and diversity in design while addressing issues of height, scale, mass and articulation.

Program LU.14.b: Review existing height limits in existing land use districts to determine whether current regulations result in structures appropriate in height and scale to the physical character of the City.

Program LU.14.c: Review the residential parking requirements in the Zoning Ordinance to determine their effect on the height, mass and scale of structures and grading implications and whether amendments to the Code should be considered.

Program LU.14.d Establish height limits for new zoning districts, taking into consideration the geology and topography of the area, as well as impacts to adjacent uses.

DRAFT

Page 66 of 151 ends

Attachment 3

Page 84 of 169 ends

V-20
Program LU.14e: Establish clear and defined performance standards in the Zoning Ordinance for buildings and signs visible from the hillsides of Central Brisbane. Standards should address light and glare, the treatment of roofs and the screening of mechanical equipment.

Program LU.14.f: Consider amendments to the Zoning Ordinance to establish standards for protecting the character of the existing residential Central Brisbane subarea, including attention to scale, juxtapositions, views, natural topography and ecological protection.

Program LU.14.g: Amend the Zoning Ordinance to prohibit tall smokestacks and industrial towers.

Program LU.14.h: Amend the Zoning Ordinance to require that large parking lots be broken up by landscaped areas and parkway strips.

Policy LU.15 Encourage the maintenance and upgrading of structures and sites that have played important roles in the City's history.

Program LU.15.a: Provide courtesy inspections of historic structures and sites to advise owners of needed corrections and repairs.

Program LU.15.b: Provide information to owners of historic structures regarding State tax incentives for rehabilitation.

Program LU.15.c: Seek official designation of historical structures and sites and pursue all means of ensuring their permanent preservation.

Policy LU.16 Encourage the maintenance and upgrading of residential and nonresidential structures to improve safety and appearance.

Program LU.16.a: Prevent blight and deterioration by providing public information and enforcing health and safety codes.

Program LU.16.b: Seek funding sources, such as low-interest loans and grants for rehabilitation of existing structures, and encourage property owners to take advantage of such programs.

The physical character of the community is an essential part of the "glue" that holds the community together. Knowing neighbors and merchants, meeting residents as a part of daily business, and attending community events at regular locations all contribute to the sense of community and all are directly affected by the arrangement of the physical environment.

Policy LU.17 Encourage interaction and involvement among neighbors on a day-today basis and foster a sense of security in the community through the design and location of private development and public improvements.

DRAFT

Page 67 of 151 ends

Attachment 3

Page 85 of 169 ends

V-21
Program LU.17.a: Establish the Central Brisbane subarea as the "town center" and the hub of civic activities.

Program LU.17.b: As outer areas develop, assure connections and compatibility with the existing community.

Policy LU.18 Locate and design commercial recreational facilities and services so as to encourage use by a broad spectrum of Brisbane residents and businesses.

Program LU.18.a: Consider access for vehicles, bicycles and pedestrians in conjunction with the siting of commercial services and recreational facilities.

Program LU.18.b: Require all commercial services and public facilities to be accessible to persons with disabilities in accordance with State and Federal regulations.

Policy LU.19 Provide centrally located public facilities for public services and community events so as to maximize use by Brisbane residents and businesses.

Program LU.19.a: As a part of the City's Capital Improvement Planning, consider the need for and appropriate location of public facilities, such as a City Hall, Community Center, Recreation Center and Police Station.

Program LU.19.b: Improve the Old County Road site as a central gathering point for community events.

Program LU.19.c: Continue to maintain and upgrade the Community Center.

Program LU.19.d: In coordination with the School District, continue shared community use of District facilities
Program LU.19.e: Determine the best civic use for the Old Fire Station site on San Bruno Avenue.

Open Areas
The developed community consists of a pattern of built structures and open areas. Open areas are defined below:

Open areas are parcels of land or portions thereof, primarily in private ownership, that serve to soften the impacts of urban development and otherwise provide primarily green areas and a feeling of "openness" to the development pattern. Open areas include, but are not limited to, setbacks and easements that are landscaped or characterized by native vegetation, gardens and landscaped vegetation. Open areas might also include golf courses, private parks and recreation areas within private developments. An open area may consist of a combination of hardscape and DRAFT

Page 68 of 151 ends

Attachment 3

Page 86 of 169 ends

V-22
landscape, typical of plazas, sculpture gardens and gathering places. Streets, sidewalks, parking lots and similar improvements, although not covered by structures, do not qualify as open areas.

The policies in this section address only these open areas. (For the definition of Open Space see page 111 and for policies on Open Space and Aquatic Areas, refer to Chapter VII.) Table 2 provides examples of the various types of open areas that could be provided in accordance with General Plan policy. To the extent that the development pattern is governed by code requirements that establish parameters for design and placement of improvements, the provision of open areas stems directly from City regulations. Most requirements for open areas will be formulated as part of the zoning regulations. It should be noted that in this chapter, the policy for subareas designated Planned Development establishes a minimum of 25% of the surface land, not including aquatic areas, to be preserved as either open space or open areas.

The following policies and programs speak to the provision of open areas in Brisbane's development pattern and the intent to preserve a sense of openness and avoid the feeling of increasing density.

Policy LU.20 The establishment of open areas within private developments shall be utilized as a means of preserving unique environmental features on the site or avoiding the appearance of excessive bulk or concentration of structures.

Policy LU.21 Preserve open areas with biological value and/or significant topographic characteristics at the perimeter of the City that maintain Brisbane as separate and distinct from nearby communities.

Policy LU.22 Retain sufficient open areas between structures to meet safety requirements, protect privacy and provide opportunities for landscaping.

Program LU.22.a: Review the setback, lot coverage and landscape requirements in the Zoning Ordinance to assure adequate open areas in the development pattern.

Program LU.22.b: Adopt new zoning regulations, as necessary, with specific qualifying requirements for open areas and square footage and for percentage minimum standards for all development districts.

Program LU.22.c: In all multi-structure development proposals, consider the DRAFT
pattern of open areas as an integral part of the development concept.

Page 69 of 151 ends

Attachment 3

Page 87 of 169 ends

V-23
TABLE 2
Typical Open Areas
beach open natural areas
berry farms outdoor employee break area
bird sanctuary parcourse
bocci ball courts parkway strips
botanical gardens parks
community garden petting zoos
firebreaks picnic grounds
fish ponds playgrounds
gardens playing fields
golf course plazas
grassy amphitheaters sculpture gardens
horse corrals and open arenas tea gardens
horseshoe courts topiary
landscaped areas outside the setbacks tot lots
landscaped creeks and streams tree farms
landscaped paths, trails unimproved steep slopes
landscaped patios wading pools
landscaped setbacks water elements
landscaped swimming pools water fountains
large landscaped medians wetland areas
native plant exhibition areas wildlife areas
nursery yard
Policy LU.23 Retain sufficient distances between development and designated open space and natural areas to enhance and respect the amenity and value of the resource.

Program LU.23.a: Establish minimum setback requirements from the Brisbane Lagoon, Levinson Marsh, and other designated aquatic areas consistent with good planning and conservation practices in consultation with the California Department of Fish and Game.

Policy LU.24 Combine the benefits of open areas with the establishment of safety buffers and conservation areas.

Program LU.24.a: Consider a setback requirement to achieve separation from areas of wildland fire hazard.

Program LU.24.b: Consider hillside development standards that retain steep slopes as open areas.

DRAFT

Page 70 of 151 ends

Attachment 3

Page 88 of 169 ends

V-24
Policy LU.25 Respect the historic pattern of open areas in Central Brisbane and retain this character in conjunction with the rehabilitation of existing structures when consistent with good planning and safety practices.

Program LU.25.a: Review the Zoning Ordinance for opportunities to retain certain parking and setback nonconformities that contribute to the historic pattern of open areas in Central Brisbane.

Program LU.25.b: Review the parking and setback requirements in the Zoning Ordinance to ascertain how the requirements affect the pattern of open areas and whether amendments to the Code could provide more open areas and landscape along the street right-of-way.

Program LU.25.c: Underground utilities in conjunction with all new development.

Program LU.25.d: If economically feasible, underground utilities in conjunction with street reconstruction.

Policy LU.26 Keep open areas and opportunities for landscaping along arterial and collector streets by establishing setbacks from the right-of-way.

Program LU.26.a: Examine district regulations to ascertain whether amendments to the Code are necessary to provide adequate setbacks to establish open areas along the right-of-way.

Streets
Streets serve to bridge the various parts of the community. They are important both in their function and in their physical expression. In Brisbane, residential streets have a unique character based on their relationship to the topography and their historical development. Likewise, some streets serving non-residential areas still reflect their origins as early highways and haul roads.

In cities, with the passage of years, streets require repair and reconstruction as well as modification to meet current safety standards. As vacant lands develop, new streets may be constructed. The following policies address the desired physical character of both new and existing streets in Brisbane (see the chapters on Transportation and Circulation, and Community Health and Safety for additional policies on streets):

Policy LU.27 In conjunction with safety improvements to existing streets, retain the historic character of the City to the greatest extent feasible.

Program LU.27.a: If safety standards are met, retain and enhance unique features such as rock escarpments, retaining walls, "gateways" (such as the entry to Crocker Park) and historic, aged trees.

DRAFT

Page 71 of 151 ends

Attachment 3

Page 89 of 169 ends

V-25
Policy LU.28 Design new streets to be attractive and comfortable for pedestrians and bicyclists, and to safely accommodate vehicular traffic. Street configuration, landscape and signage should all be considered as they contribute to community character.

Program LU.28.a: Require landscaping along all major arterial streets.

Program LU.28.b: Construct landscaped medians where appropriate in arterial streets.

Program LU.28.c: Use drought resistant, water-conserving non-invasive plant materials that reflect local character.

Program LU.28.d: Continue to implement a street tree planting and management program and improve it as appropriate.

Program LU.28.e: Improve the program for street and directional signs Program LU.28.f: Prohibit new commercial billboard sites and seek to remove those currently in place.

Program LU.28.g: Provide standards in the Municipal Code to assure that abutting properties have adequate separation from travelways and protection from noise and other traffic impacts
Program LU.28.h: Consider funding methods, such as landscape assessment districts, to install and maintain improvements within rights-of-way.

Program LU.28.i: Work with appropriate State and County agencies, private organizations, service clubs and property owners to maintain an attractive appearance of major thoroughfares
Program LU.28.j: Encourage environmental groups, local service clubs, individuals and local businesses to "adopt a street" to support litter removal and encourage volunteer beautification projects along streets and remaining rights-of-way Program LU.28.k: Discourage wind channelization when approving new streets.

Subdivision Pattern
Policy LU.29 Establish subdivision standards that acknowledge the constraints of topography and the ability to serve parcels with infrastructure to City standards.

DRAFT

Page 72 of 151 ends

Attachment 3

Page 100 of 189 ends

V-26
Program LU.29.a: Develop a list with supporting documentation of these constraints, including fiscal, geophysical, ecological, etc.

Policy LU.30 On an ongoing basis, bring unrecorded subdivisions into compliance with the Subdivision Map Act and City standards.

Program LU.30.a: Require that unrecorded lots be surveyed and a parcel map recorded before permitting new improvements to be constructed or existing improvements intensified on the property.

DRAFT

Page 73 of 151 ends

Attachment 3

Page 101 of 189 ends

V-27

FOOTNOTES

1. See Housing Element and background reports GP-2 and GP-3 for further detail.

2. See background report EC-2 for more information on employee density factors.

DRAFT

Page 74 of 151 ends

Attachment 3

Page 102 of 189 ends

Attachment 3
Proposed Land Use Designation Revisions
To accommodate the Baylands Specific Plan
Proposed Revisions
PD- RP
C/P-U Baylands Specific Plan (BSP) Area
Proposed change to Land Use Designation -
'PD - NR' Designation to replace 'HC Designation
up to north boundary of Baylands Specific Plan Area
Northw,
Bayskar

PD - S C/R/O

PD - NR

NER - PD-R
TC

PD - TC
M/L/B
Bayshores

S C/R/O
Current Land Use Designations
PD - NR Baylands Planned Development - Non Residential
PD - RP Baylands Planned Development - Residential Permitted R Brisbane Acres
R Central Brisbane
R Central Brisbane B SP ORIO PFP
C/P - U Commercial Public Utilities
PD - S C/R/O Guadalupe Hills Planned Development
HC Heavy Commercial
M/L/B Marsh/Lagoon/Bayfront
N C/R/O Neighborhood Commercial/Retail/Office
NER - PD - R Northeast Ridge Planned Development - Residential OS Open Space
PR-TC Parkside Residential
PFP Public Facilities and Parks
PD - TC Quarry Planned Development
SP C/R/0 Sierra Point Commercial/Retail/Office
S C/R/O Subregional Commercial/Retail/Office

Page 75 of 151 ends
Page 103 of 189 ends

TC Trade Commercial
PEggel 082010189
Resolution
2021-ER-1/2021-SP-1/2021-RZ-3/2021-GPA-2

EXHIBIT E
Brisbane General Plan Circulation Element Amendments

Page 76 of 151 ends

Attachment 3

Page 104 of 189 ends

Includes Updates Adopted by City Council September 2015 and January 2020 Resolutions 2015-38 and 2020-01

CHAPTER VI

CIRCULATION ELEMENT
GOALS:

The City of Brisbane will be a place…
Where there is an established rational relationship between land use and circulation in place to guide the City into the future; Where all users of the transportation network can travel safely and comfortably throughout Brisbane;
Where Complete Streets are integrated into the transportation network to provide for a balanced, connected, safe and
convenient multi-modal network;
Where reliable public transit services are promoted and expanded, creating viable transportation alternatives to the automobile;
Where parking needs have been reasonably balanced to
encourage walkable neighborhoods, economic vitality, safety and convenience; and
Where the transportation network serves the needs of residents as well as commercial and industrial businesses.

DRAFT

Page 77 of 151 ends

Attachment 3

Page 105 of 189 ends

VI-2
DRAFT

Page 78 of 151 ends

Attachment 3

Page 106 of 189 ends

VI-1

CIRCULATION
Chapter Index
Page
VI.1 Description of Circulation System .................................................................................VI-3 Streets and Highways.................................................................................................... VI-3 Transit Systems ............................................................................................................ VI-10 VI.2 Traffic Flow, Convenience and Access ........................................................................ VI-1011 Roadway Performance ................................................................................................. VI-1012 North-South and East-West Corridors ......................................................................... VI-12 14 Street Standards ............................................................................................................ VI-1315 VI.3 Traffic Safety ................................................................................................................ VI-1416 Local Residential Streets .............................................................................................. VI-1416 Arterial Streets ............................................................................................................. VI-1416 Truck Routes ................................................................................................................ VI-1517 Improvements Funding ................................................................................................ VI-1517 VI.4 Complete Streets ........................................................................................................... VI-1517 Complete Streets Applicability and Design Standards ............................................ VI-15 17 Bicycles and Pedestrians ............................................................................................ VI-1719 Transit .......................................................................................................................... VI-2022 VI.5 Transportation Management ......................................................................................... VI-2123 VI.6 Parking .......................................................................................................................... VI-2123 VI.7 Circulation and Land Use ............................................................................................. VI-2224 VI.8 Green Streets ................................................................................................................. VI-2426 VI.9 Alternative Transportation Modes ................................................................................ VI-2527 VI.10 San Francisco
DRAFT -San Mateo Bi-County Transportation Study......................................... VI-2628

Page 79 of 151 ends

Attachment 3

Page 107 of 189 ends

VI-2

CHAPTER VI

CIRCULATION ELEMENT
This circulation element addresses how the City of Brisbane will maintain, enhance and expand its circulation system to best meet the needs of its residents, business community, and visitors travelling to, from or through Brisbane.

Key considerations in Brisbane’s circulation system planning are to recognize the land use context within the various areas of the City and the existing geographic or physical constraints in those areas, while at the same time recognizing opportunities for improvements and potential connections within the larger regional circulation network that will best serve the community. These considerations are reflected in Brisbane’s circulation element goals, as detailed on the previous page, as well as through the policies and programs that follow.

In working to enhance both the local function of the circulation network and its regional connections, Brisbane will continue in its collaborative efforts with other local and regional agencies and will continue to seek various regional, state, and federal funding resources for projects which are of local and regional concern.

Brisbane’s goals are consistent with the state and regional goals which are expressed through the Bay Area’s Metropolitan Transportation Commission (MTC) and the Association of Bay Area Governments’ (ABAG’s), “Plan Bay Area” and the intent of the California Complete Streets Act of 2008 (AB 1358, Leno), codified in Sections 65040.2 and 65302 of the Government Code.

This element is organized as follows:

VI.1 Description of Circulation System
o Streets and Highways
o Transit Systems
VI.2 Traffic Flow, Convenience and Access
o Roadway Performance
o North-South and East-West Corridors
o Street Standards
VI.3 Traffic Safety
o Local Residential Streets
o Arterial Streets
o Truck Routes
o Street Signage
o Improvements Funding
VI.4 Complete Streets
o Complete Streets Applicability and Design Standards
o Bicycles and Pedestrians
o Transit
VI.5 Transportation Management
DRAFT

Page 80 of 151 ends

Attachment 3

Page 108 of 189 ends

VI-3
VI.6 Parking
VI.7 Circulation and Land Use
VI.8 Green Streets
VI.9 Alternative Transportation Modes
VI.10 San Francisco-San Mateo Bi-County Transportation Study Certain aspects of this element address broad policy issues while others are more detailed implementation programs. Given the technical nature of transportation issues, engineering analysis and judgment are integral to the implementation of the element. Where policies or programs refer to a City action, they may include tasks or decisions involving City Council and potentially multiple City departments, and/or professional engineering work under the responsible charge of the City Engineer. This is determined on a case-by-case basis, by the City, consistent with state law regulating the work to be done by qualified, licensed engineering professionals.

Figures C.1 and C.2 show the circulation system within the planning area, including the major thoroughfares as well as the local street network. Figure C.3 illustrates changes to the circulation system in the planning area.

VI.1 DESCRIPTION OF CIRCULATION SYSTEM
Streets and Highways
The San Francisco Bay and San Bruno Mountain are the major determinants of the geographic layout of the street and highway system serving the planning area, with Highway 101 and Bayshore Boulevard serving as the main transportation corridors to, through and within the City. The following provides a brief outline of the major streets and highways. Streets or highways are assigned a functional classification, based on a hierarchy of the function and vehicular travel movement capacity.

1. Regional Routes: Regional Routes are roadways and highways that cross county boundaries and/or carry large volumes of through traffic to and from locations outside of Brisbane that does not have a destination within the City other than the Bayshore Caltrain station. The need to distinguish mobility issues and policies along Regional Routes from issues and policies facing other roadways within the City is demonstrated by:
• Increased vehicular congestion that will occur within Brisbane along these routes due to the large amount of development being approved in cities to the north and south of Brisbane;
• Adoption of SB 743, which calls for balancing the need for infill residential, commercial, employment-generating, and mixed use development in proximity to transit and the need for reducing greenhouse gas and air pollutant emissions with the need for addressing vehicular traffic congestion;
DRAFT

Page 81 of 151 ends

Attachment 3

Page 109 of 189 ends

VI-4
DRAFT
Freeway
Principal Arterial
Minor Arterial
Major Collector
Local
Private
()
~ Feet
0 500 1,000 2,000
Figure C-1
Existing Street Classification

Page 82 of 151 ends

Attachment 3

Page 100 of 169 ends

VI-5
DRAFT
Principal Arterial
Minor Arterial
Major Collector
Local
Private
()
~ Feet
0 180 360 720
Figure C-2
Existing Street Classification
Central Brisbane Area

Page 83 of 151 ends

Attachment 3

Page 101 of 169 ends

Attachment 3
New Freeway
Interchange
Proposed
Multimodal Sta
Proposed
$ Propos
Subje
Replace with new Figure C-3
Freeway
Principal Arterial
Figure C-3
Minor Arterial
Major Collector Proposed
Local U Feet
500 1,000 2,000 Circulation Improvements
Private
Regional Arterial

Page 84 of 151 ends
Page 102 of 169 ends

VI-6
Pagge102 of 169
VI-7
Replace with new Figure C-4
DRAFT

Page 85 of 151 ends

Attachment 3

Page 103 of 169 ends

VI-8
• SB 743 CEQA Guidelines, approved in December 2018 that eliminate traffic congestion as a significant impact under CEQA;
• The US 101 freeway is owned, operated, and maintained by the State of California.

Changes to the freeway and its interchanges are subject to review and approval by Caltrans. In practice, physical modifications to the freeway and its interchanges are more influencdedinfluenced by regional traffic patterns and regional organizations such as MTC and C/CAG than by local needs; and
• Limited capacity for widening of the 101 freeway and Bayshore Boulevard to accommodate vehicular traffic generated outside of the City, along with the limited ability of the City of Brisbane to make meaningful freeway improvements.

Two types of Regional Routes occur within Brisbane:
a. Freeways: Freeways are limited access, high-speed travel-ways, which are included in the state and federal highway systems. They carry regional through traffic, and access is provided at interchanges, generally at intervals of one mile or greater. Brisbane has one freeway, U.S. Highway 101, along its eastern edge.
b. Regional Arterials: Regional Arterials are major streets, such as Bayshore Boulevard and the Geneva Avenue extension that serve regional functions and carry large volumes of traffic generated from outside of Brisbane that does not have a destination within the City.

2. Principal and minor arterials: Arterials are major streets that primarily serve through traffic and on a limited basis they may provide access to abutting properties. They are generally designed with 4 to 6 lanes and major intersections are usually signalized. Brisbane has both principal and minor arterials, with the minor arterials in Brisbane being only two lanes, except for the eastern portion of Valley Drive, which is four lanes.

3. Major and Minor collectors: Collector streets connect arterial streets and local streets with reduced traffic volumes and generally narrower roadways than the arterials. They generally have two travel lanes, parking lanes, sidewalks, and street trees or planting strips.

4. Local: Local streets provide access to individual abutting properties as their primary function.

Local streets have no more than two travel lanes.

4.5. Green Shared Street: Green Shared Streets provide direct access to residential areas. They prioritize pedestrians and bicyclists, while accommodating bidirectional vehicular movements within one shared, mixed travel lane. Design elements include a curbless cross-section, street furnishings, and traffic calming measures.

The street classifications within Brisbane are generally described as follows:

Regional Routes
U.S. Highway 101- Freeway: The U.S. 101 freeway traverses the eastern edge of Brisbane and is the main corridor serving north-south traffic along the San Francisco Peninsula between the Santa Clara DRAFT

Page 86 of 151 ends

Attachment 3

Page 104 of 169 ends

VI-9
Valley and San Jose to the south and San Francisco to the north. Highway 101 on- and off-ramps within Brisbane are currently limited to those at Beatty Avenue and the north and south ends of Sierra Point Parkway.

Bayshore Boulevard: Bayshore Boulevard is a decommissioned State Highway and is now a City owned and maintained arterial roadway. Bayshore Boulevard serves as the City’s primary north-south transportation route, connecting Brisbane to San Francisco, Daly City, and South San Francisco. Together with its connecting minor arterial streets, Bayshore Boulevard also provides linkages to and from Highway 101. As a result, Bayshore Boulevard’s performance affects all traffic access and circulation through the City.

Bayshore Boulevard functions primarily as a regional roadway through the City of Brisbane. Peak hour congestion along Highway 101 causes traffic to be diverted from the freeway onto Bayshore Boulevard through the City of Brisbane as motorists attempt to avoid congested freeway traffic. Depending on the time of day and location, regional through traffic makes up 60 to 80 percent of traffic on Bayshore Boulevard. On a daily basis, only 10 to 15 percent of all trips on Bayshore Boulevard are generated from Brisbane’s residential neighborhoods and 15 to 20 percent are generated by Brisbane’s employment centers. The majority of traffic on Bayshore Boulevard within Brisbane is between San Francisco and cities to the south, with a smaller amount (approximately 15 percent of all trips) traveling between Daly City and the cities to the south.

A principal challenge for the City is maintaining vehicular mobility for Brisbane residents and businesses along Bayshore Boulevard. As large-scale developments occur in cities to the north and south of Brisbane, regional through traffic and congestion on Bayshore Boulevard is projected to increase. It is also important that Bayshore Boulevard provide safe access and egress for sites located along its frontage while maintaining its ability to move vehicles through the City. Another issue is providing for safe and comfortable access for bicyclists and pedestrians. In 2008 and 2011, bikeways were completed on both sides of Bayshore Boulevard, in part with funding obtained by the City through the California Transportation Development Act. These bikeways include 6 foot wide striped bike shoulders and rumble strips, which have enhanced their function within the regional bikeway network and have helped address bicycle access and safety.

Questions for the future remain regarding the function and design of Bayshore Boulevard and how it to best address the way this roadway is being used by regional through traffic, while meeting the mobility needs of the local community.

Along with approval of the Baylands Specific Plan, the City adopted the Bayshore Mobility Plan, a vision for the future of Bayshore Boulevard. It includes the following goals:
• Enhance connectivity for residents and land uses abutting Bayshore Boulevard; • Increase connectivity between the Baylands and the City of Brisbane for people traveling along and crossing Bayshore Boulevard;
• Reduce the prominence of regional through-traffic along Bayshore Boulevard by implementing a road diet;
• Redesign Bayshore Boulevard as a multi-modal corridor to increase the level of comfort and safety for all roadway users including automobiles, emergency response vehicles, transit vehicles, trucks, bicycles, and pedestrians in accordance with General Plan Policy C.1 to “provide for comfortable and safe travel within the community to shopping, employment, and recreation, as well as to transit” and the recommendations of the 2022 Complete Streets Safety Assessment; and
DRAFT

Page 87 of 151 ends

Attachment 3

Page 105 of 169 ends

VI-10
• Improve the look of the corridor, providing opportunities for landscaping, gateway features, wayfinding, and other features that increase the prominence of the roadway as a route local route for Baylands residents rather than a regional cut-through route.

Geneva Avenue: Geneva Avenue is currently an east-west arterial within the jurisdiction of Daly City with its current eastern terminus at Bayshore Boulevard, providing a link between Brisbane and Daly City. Upon development of the Baylands, an extension of Geneva Avenue will be constructed through the Baylands. The Geneva Avenue extension will serve as the primary east-west connection through the Baylands and as an important connection to Highway 101 for traffic generated within both Brisbane and Daly City. A new interchange for Geneva Avenue at Highway 101 would be constructed to replace the current Highway 101 on- and off-ramp interchange at Alana Way and Harney Way with a new more efficient interchange configuration known as the Candlestick Interchange.

Principal Arterials
Guadalupe Canyon Parkway: Guadalupe Canyon Parkway is an east-west principal arterial with its eastern terminus at Bayshore Boulevard, providing links to Daly City.

Alana Way & Harney Way: Short segments of Alana Way and Harney Way are within Brisbane and serve as principal arterials connecting to Highway 101 from Beatty Ave. in Brisbane and Harney Way at Candlestick Point.

Minor Arterials
Visitacion and San Bruno Avenues connect with Old County Road in Central Brisbane and all three streets serve as minor arterials for this area. Old County Road becomes Tunnel Avenue as it crosses over Bayshore Boulevard, and connects with Beatty Avenue and Lagoon Way. Lagoon Way then connects with Sierra Point Parkway. All of these are classified as minor arterials. Similarly, Valley Drive (eastern portion), North Hill Drive and the eastern portion of Mission Blue Drive serve as minor arterials in the Crocker Park and Northeast Ridge subareas.

Tunnel Avenue provides an alternative to Bayshore Boulevard, while Sierra Point Parkway provides access/egress for the Sierra Point subarea. The Tunnel Avenue railroad overpass was replaced in 2007 to meet current seismic safety standards, to improve the geometry of the crossing, and to provide bike and pedestrian lanes. These improvements have added significantly to the viability of Tunnel Avenue as an alternative to Bayshore Boulevard. The remaining portions of Tunnel Avenue and its connecting streets will also be further improved upon development of the Baylands.

Lagoon Way serves as the east-west connection between Central Brisbane and access to southbound Highway 101, via Tunnel Avenue. Beatty Avenue likewise serves as a connection to and from the northeast corner of the City, from Tunnel Avenue to access to north and southbound Highway 101.

The challenge facing Brisbane for minor arterial streets is to evaluate these on a case-by-case basis relative to the goals, policies and programs, to define how they can be modified to enhance and provide alternative modes of transportation and to secure funding sources to implement improvements that are DRAFT

Page 88 of 151 ends

Attachment 3

Page 106 of 169 ends

VI-11
determined to be a priority by the City.

Major Collector Streets
Major collector streets include Humboldt Road, Glen Parkway, a portion of Monterey Street and a portion of Visitacion Avenue, which connect several local streets within the residential area of Central Brisbane.

The western portions of both Valley Drive in Crocker Park and Mission Blue Drive in the Northeast Ridge are also classified as major collectors, as is Monarch Drive and the eastern portion of West Hill Drive, which connect Crocker Park and the Northeast Ridge subareas. Within the northern portion of the Baylands Specific Plan, Main Street, East Campus Road, Campus Parkway, and Sunnydale Avenue are east-west collectors, and Baylands Boulevard is a north-south collector.

The challenges for the major collector streets are, as stated above for the minor arterials, to define how they can be modified to enhance and provide alternative modes of transportation and to secure funding sources to implement improvements.

Local Streets
Local streets serve most of the residential areas of Central Brisbane, and the Northeast Ridge, and the Baylands Specific Plansubarea. While the Northeast Ridge and Baylands Specific Plan is are a more recent developments and the streets were are or will be built to meet modern standards, Central Brisbane’s existing development pattern poses significant challenges in providing separation between vehicles, bicycles, and pedestrians, due to existing street widths and steep topography. These challenges increase from the lower Central Brisbane streets to the very steep and narrow upper streets. While separate travel lanes are limited along those streets, the roadway geometry necessitates low vehicle speeds on these shared roadways, thus mitigating some of the need for wider roadway sections.

Green Shared Streets:

The Green shared street classification is a street classification unique to The Baylands subarea. Green shared streets are curbless, streets located in residential areas that prioritize pedestrians and bicycles and are designed for slow speeds and shared use with automobiles. Examples would include residential streets within the Roundhouse and Bayshore districts of the Baylands Specific Plan.

TRANSIT SYSTEMS
Brisbane is served by the following transit systems connecting to regional destinations:
• San Mateo County Transit District (SamTrans)
• Caltrain
• Local shuttle service
DRAFT

Page 89 of 151 ends

Attachment 3

Page 107 of 169 ends

VI-12
Currently in Brisbane, SamTrans runs bus routes along Bayshore Boulevard seven days a week, and the Bayshore Caltrain station is located at the northern border of the City. Both the bus line and train lines generally run north-south. Transfers to reach other destinations off these north-south lines generally involve long wait times and often there are disconnects between the different modes of transportation.

For example, the Bayshore Caltrain station is approximately 1-½ miles from Central Brisbane, and the SamTrans bus line serving Central Brisbane currently does not connect to the Caltrain station. The stops between SamTrans and Caltrain at the north end of Brisbane are approximately ½-mile walking distance apart. Improvement of these connections and development of a multi-modal station at the northern end of Brisbane are proposed to be implemented as part of the Baylands development.

San Francisco’s Muni Metro Light Rail System extends to Bayshore Boulevard and Sunnydale Avenue near the northern border of Brisbane. Connectivity to a multi-modal transit facility is anticipated under the Baylands development.

Private and public commuter shuttles provide service to and from Brisbane’s commercial areas of Sierra Point and Crocker Park and along Old County Road and San Bruno Avenue to regional transit connections and to the Daly City Bayshore neighborhood. A new, fare-free shuttle system will be provided to integrate new development within the Baylands as set forth in the Baylands Specific Plan into existing routes that connect Brisbane with regional transit networks. Service within the western side of the Baylands will terminate at the Bayshore Caltrain station and Downtown Brisbane and service on the eastern side will integrate the Campus East District, including Lagoon Park, and terminate on the east side of the Bayshore Caltrain station and Downtown Brisbane. While these shuttle services pick up some of the slack in the local transit system, significant improvements are needed on a regional basis to begin to meet the goals outlined in “Transportation 2030” and Brisbane’s own General Plan. Shuttle scheduling information may be found on the websites www.commute.org and/or www.samtrans.org VI. 2 TRAFFIC FLOW, CONVENIENCE AND ACCESS
Roadway Performance
Historically, vehicular traffic congestion and roadway performance standards such as level of service (LOS) have been used in three different ways.

1. For roadway and freeway planning as part of a City’s General Plan or a regional transportation plan to determine the number of lanes needed along roadways or freeways to accommodate anticipated traffic volumes consistent with the applicable LOS standard.

2. For roadway or freeway improvements undertaken by a public agency to determine when a roadway or freeway needs to be widened or when additional turn lanes or through lanes are needed at an intersection to meet the applicable LOS standard.

3. To analyze in a CEQA document how the traffic generated by a proposed development project would cause or increase congestion. At intersections where a proposed project would cause LOS standards to be exceeded, mitigation measures in the form of adding capacity at intersection(s), widening roadway(s), or providing signalization would then be required to mitigate the traffic impacts of the development project and thereby maintain applicable LOS standards.

Thus, the use of level of service standards has aimed at expanding the capacity of roadway and highway DRAFT

Page 90 of 151 ends

Attachment 3

Page 108 of 169 ends

VI-13
systems to accommodate projected increasing volumes of vehicular traffic.

In recent years, however, climate change has become a matter of critical concern as greenhouse gas (GHG) levels in the atmosphere have increased dramatically due to human activity with the transportation sector (including private automobiles) being one of the largest producers of GHG emissions. In California, targets for GHG emission reductions have been established and substantial regulatory efforts are underway to ensure that these reduction targets are met. Reducing the amount of automobile travel throughout the state is one of the major strategies being put forth to reduce GHG emissions.

Policy C.1 Design the City’s roadway system to emphasize mobility for Brisbane residents and businesses, accommodate bicycle and pedestrian in addition to vehicular movement, and provide for comfortable and safe travel within the community to shopping, employment, and recreation, as well as to transit and the Highway 101 freeway.

Program C.1.a Consult with Caltrans, the Metropolitan Transportation Commission, San Francisco Transportation Authority, San Mateo County Transportation Authority, C/CAG, and others to develop and fund programs including physical improvements, enhanced use of transit, and transportation demand management, to maximize the ability of the 101 freeway to accommodate regional through traffic.

Program C.1.b Develop design plans for Bayshore Boulevard, the Geneva Avenue extension, and interchanges along the 101 freeway that address the effects of regional through traffic within Brisbane and enhances mobility for Brisbane residents and businesses through a combination of roadway and intersection, transit, bicycle, and pedestrian facility improvements that would not cause a substantial increase in vehicle miles travelled (VMT) on Bayshore Boulevard or other routes through the City. As part of this design plan, evaluate (1) whether changes in design speeds along Bayshore Boulevard could improve mobility within the City; (2) the feasibility of shifting a portion of regional through traffic from Bayshore Boulevard onto other routes, such as Sierra Point Parkway by extending that roadway north to the 101 freeway interchange at Beatty Avenue, and (3) appropriate routing of trucks to and from the Crocker Park area.

Program C.1.c Prepare, adopt, and implement a mobility improvement fee program to fund the multi-modal improvements called for in the design plan for Bayshore Boulevard and interchanges along the 101 freeway.

Program C.1.d Rather than undertake multiple traffic impact analyses to evaluate individual intersections along Bayshore Boulevard, Geneva Avenue, and at intersections along the 101 freeway, require new development projects that would generate 50 or more peak hour trips at any intersection along Bayshore Boulevard, Geneva Avenue, or at intersections along the 101 freeway to comply with the design plan developed pursuant to Program C.1.c and either provide physical improvements consistent with the plan or pay established traffic impact fees as directed by the Public Works Director .

Policy C.2 The level of service objective for principal and minor arterial streets within the City is LOS "D."
Program C.2a Require development projects that would generate 50 or more peak hour trips at an arterial street intersection to prepare a traffic impact analysis.

Program C.2.b In lieu of requiring individual development projects to prepare traffic impact analyses to evaluate intersections and require mitigation measures for impacts at DRAFT

Page 91 of 151 ends

Attachment 3

Page 109 of 169 ends

VI-14
intersections along principal and minor arterials streets, consider developing a program of impact fees to fund multi-modal improvements and reduce automobile traffic generation in coordination with the San Mateo County Congestion Management Plan, as applicable.

Policy C.3 Design turning movements and traffic signal timing at intersections so as to avoid the queueing of vehicles at intersection from backing up and adversely affecting operations at another intersection. Design turning movements and traffic signal timing at freeway interchanges cause queueing of vehicles from the intersection onto the freeway mainline.

North-South and East-West Corridors
Policy C.4 Plan for an additional east-west corridor to redirect non-destination traffic away from Bayshore Boulevard and to provide more direct access to Highway 101.

Program C.4.a Pursue an extension of Geneva Avenue, connecting with the Candlestick Highway 101 Interchange that provides for bus rapid transit and connection to the Bayshore Caltrain station.

Program C.4.b Consult with Caltrans in the design of the Candlestick Highway 101 Interchange to assure the best connection with the Geneva Avenue Extension.

Program C.4.c Require that all east-west corridor rail crossings are grade-separated (i.e., not at-grade) to the extent permitted by law.

Policy C.5 Continue to upgrade north-south arterial and collector streets while providing the appropriate level of service.

Program C.5.a Require the upgrade of Tunnel Avenue to current codes and safety standards.

Policy C.6 Investigate and pursue alternative means of access to and egress from Sierra Point and investigate additional emergency access alternatives.

Policy C.7 Investigate and pursue traffic calming features for Visitacion Avenue, Old County Road and San Bruno Avenue to provide for greater pedestrian comfort and safety at street crossings.

DRAFT

Page 92 of 151 ends

Attachment 3

Page 110 of 169 ends

VI-15
Street Standards
Policy C.8 Implement established City street standards to provide for adequate traffic flow and safe vehicular, bicycle, and pedestrian movement along both existing and new streets.

Program C.8.a Consult with Caltrans in regard to street standards when a City street is a connector or ramp to a State route.

Policy C.9 For local residential streets in Central Brisbane, continue to require a minimum unobstructed street width of 20 feet, as required by the Uniform Fire Code.

Program C.9.a Permit exceptions that meet the required findings set forth in the Municipal Code.

Policy C.10 The City Engineer shall consider the following factors during plan review as they apply to residential, residential hillside, and commercial streets:
• grade
• topography
• average lot frontage size
• number of lots and potential intensity of development • maximum block length
• maximum length of cul-de-sac streets
• length of street in relation to number of units served • turnarounds
• parking
• secondary access
Program C.10.a Continue to implement street development standards that establish requirements for right-of -way dedication, street width, length, turnarounds, and access to parcels.

Program C.10.b Continue to implement street engineering design and construction standards that establish requirements for horizontal alignment and vertical alignment, pavement and pavement crown, concrete curb, and structural section design.

DRAFT

Page 93 of 151 ends

Attachment 3

Page 111 of 169 ends

VI-16
Program C.10.c Continue to implement standards for sidewalks, bikeways, signalization, striping, and street lighting.

Policy C.11 Require designs for hillside streets to reflect the topography and to minimize grading and large retaining walls.

Program C.11.a Consider incorporation of small scale parking bays, rolled curbs, and other means of including parking and providing safe clearance on hillside streets.

VI. 3 TRAFFIC SAFETY
Local Residential Streets
Policy C.12 Maintain and improve local residential streets to accommodate safe access for emergency vehicles and evacuation routes for residents.

Policy C.13 As a part of the budget and capital improvement planning process, consider opportunities to incorporate safety standards and/or widen hillside streets to current city adopted standards.

Policy C.14 Develop a prioritized program for improvements to existing substandard City streets to include such things as street widening, turnarounds and the feasibility of secondary emergency access, and improving on-street parking.

Program C.14.a Investigate the feasibility of undergrounding utilities to mitigate potential traffic hazards, such as downed lines in a fire.

Program C.14.b Consider opportunities and funding to enhance safety on steep streets.

Policy C.15 Post and actively enforce the 25-mile per hour (mph) maximum speed limit in Central Brisbane and 15 mph on identified street segments near the schools, and investigate creating speed limit zones lower than 25 mph in other areas of Central Brisbane where appropriate.

Policy C.16 Promote a public awareness campaign regarding speed limits.

Arterial Streets
Policy C.17 Maintain traffic flow and continue to improve arterial streets to accommodate vehicular, bicycle, and pedestrian movement.

DRAFT
------------

Page 94 of 151 ends

Attachment 3

Page 112 of 169 ends

VI-17
Program C.17.a Limit and control the number and location of driveways into arterial streets as needed to maintain mobility within the City. Encourage adjacent properties to develop common access. See also Program C.22.2 in Complete Streets section.

Program C.17.b Use landscaped medians and islands to direct and channel traffic, where needed to provide for mobility for Brisbane residents and businesses, as well as to provide safe separation and visual respite.

Truck Routes
Policy C.18 Maintain truck routes to avoid impacts on residential areas.

Program C.18.a. In conjunction with design planning for Bayshore Boulevard and the Geneva Avenue extension, undertake a review of appropriate truck routes within Brisbane, including truck routes to serve Crocker Park.

Street Signage
Policy C.19 Provide adequate signage on all streets including street names on at least one corner of every intersection and advance warning signs for major entries.

Improvements Funding
Policy C.20 Identify and pursue funding sources to implement circulation improvements.

Program C.20.a Encourage creation of assessment districts where appropriate, for needed circulation improvements.

Program C.20.b Utilize gas tax, sales tax and other funding sources to implement circulation improvements.

VI.4 COMPLETE STREETS
The state legislature passed The California Complete Streets Act in 2008, which requires that jurisdictions plan for “Complete Streets” to address the needs of all users.

Brisbane’s roadway infrastructure has largely already been built, with the notable exception of the Baylands, which will require the preparation and approval of a specific planfor which general infrastructure design standards are outlined in the Baylands Specific Plan. This Complete Streets section focuses on completing existing streets to meet the needs of bicycles, pedestrians, and transit users. New streets will also be required to be consistent with the element and provide for Complete Streets, as appropriate to the context.

Complete Streets Applicability and Design Standards
Policy C.21 The City shall provide for the development of Complete Streets consistent with Government Code Sections 65040.2 and 65302 and subsequent applicable Complete Streets legislation) to meet the needs of all users of “streets, roads and highways”.

Such users include bicyclists, children, youth, families, persons with disabilities, DRAFT

Page 95 of 151 ends

Attachment 3

Page 113 of 169 ends

VI-18
motorists, movers of commercial goods, pedestrians, users of public transportation, seniors, and first responders.

Policy C.22 Integrate Complete Streets infrastructure and design features, such as sidewalks, bikeways and transit stops, into street design and construction to create safe and inviting environments for people to walk, bicycle and use public transportation.

Program C.22.a Review and where needed, update the City’s engineering design standards to implement Complete Streets infrastructure elements.

Program C.22.b Incorporate Complete Streets infrastructure elements into new streets, street retrofits and certain maintenance projects to encourage multiple modes of travel, as appropriate to the context and determined reasonable and practicable by the City.

Depending on the context, these elements may include:
• Infrastructure that promotes a safe means of travel for all users along the public right-of-way, such as sidewalks, shared use of paths, bicycle lanes, and paved shoulders; • Infrastructure that facilitates safe pedestrian crossings of the right of way, such as accessible curb ramps, crosswalks, refuge islands, and signals to meet the needs of children, people with disabilities and the elderly;
• Street design features that promote safe and comfortable travel by pedestrians, bicyclists and users of public transportation, such as traffic calming features and physical buffers between vehicular traffic and other users; • Inclusion of amenities that improve the comfort and addresses the safety needs of pedestrians and bicyclists, such as, but not limited to, signs, pavement markings, pedestrian-scale lighting, benches, seat walls, bike lockers and racks; • Improvements to public transit and multi-modal connections, to enhance City-wide transit access and connections to regional destinations; • Minimizing vehicular ingress and egress points on major arterials and consolidating private driveway entries to enhance bicycle, pedestrian and automobile safety along these arterials;
• Inclusion of street trees and other landscaping features, to enhance the appearance of the streetscape and to encourage pedestrian and bicycle use. Landscaping should use San Bruno Mountain native plants where feasible. In any case, plants should be non-invasive and drought resistant. (See also the Green Streets section of this element.) • Balance on-street parking as appropriate to the context, to promote the Complete Streets Act goals and encourage economic vitality. (See also the Parking section of this element.)
Program C.22.c Where possible, work with MTC to secure regional funding for Complete Streets projects.

DRAFT

Page 96 of 151 ends

Attachment 3

Page 114 of 169 ends

VI-19
Policy C.23 Seek to retrofit existing roadways to create Complete Streets.

Program C.23.a Identify roadways where retrofits may reasonably be accomplished in balance with existing and planned land uses, giving priority to arterial and collector streets and to projects that would provide greater connectivity between key areas of the City, such as, but not limited to, between the Northeast Ridge, Sierra Point and Central Brisbane.

Program C.23.b Identify roadways where Complete Streets retrofits may provide for enhanced place-making and contribute to the City’s vitality.

Program C.23.c Seek regional, state, and/or federal funding sources to retrofit roadways to create Complete Streets.

Policy C.24 For new multifamily, mixed use or commercial development projects subject to discretionary review that would affect the public right-of-way, incorporate and implement Complete Streets elements at each stage of the development process as determined reasonable and practicable by the City.

Program C.24.a As part of the design review permit process, require documentation of how the routine accommodation of bicyclists and pedestrians will be satisfied.

Program C.24.b As part of the project design review process, ensure that the project objectives and purpose are consistent with current MTC directives on Complete Streets and Routine Accommodation.

Bicycles and Pedestrians
Bicycle and pedestrian travel have become increasingly popular in recent years in the San Francisco Bay Area, where the weather is mild, and where there has been an increased accommodation of these modes into circulation networks throughout the region. These are typically modes used for recreation, school trips, and short- to moderate-distance commute trips. Since they are non-polluting, require relatively low cost facilities, and contribute to individual health, they are increasingly becoming valuable alternatives to automobiles and are critical components in the circulation network in contributing to sustainability. They are also critical modes for incorporation in the circulation network in providing a sense of place, especially within city centers.

Given the ties of pedestrian and bicycle access to land use, Brisbane’s General Plan includes the policies and programs that follow in this section as well as companion policies and programs within the land use and subareas elements.

Brisbane is currently in the process of creating a bicycle and pedestrian master plan that would enhance its existing network of bikeways and walkways and where possible provide greater connectivity, or improve existing bikeways and walkways that are tied to the regional network.

Regional Connections
Policy C.25 Provide input to the City and County of San Francisco and San Mateo County in regional planning efforts to enhance and expand the regional bicycle and pedestrian networks, including, where appropriate, amendments to regional bicycle and pedestrian plans.

DRAFT

Page 97 of 151 ends

Attachment 3

Page 115 of 169 ends

VI-20
Policy C.26 Continue to connect Brisbane’s bikeway and pedestrian system to the County and regional networks.

Program C.26.a Continue to apply for Transportation Development Act (TDA), successors to TDA, and other funding sources.

Safe Routes to School
Policy C.27 Work with the County Congestion Management Agency, C/CAG, and local schools to develop priorities and implement Safe Routes to School projects consistent with state and federal legislation.

Program C.27.a Continue to identify improvement projects and seek funding for Safe Routes to School infrastructure improvements.

Program C.27.b Continue non infrastructure-related activities that encourage walking and bicycling to school, through outreach on the City’s website, informational articles in the local City news publications, communications through community leaders, partnering with non-profit entities, promoting walk and bike to school days, and supporting partnerships with the schools to provide education directly to students and parents on the benefits of walking and bicycling to school.

Program C.27.c Develop and promote a traffic safety education program for the schools.

Program C.27.d Continue to provide a crossing guard program.

Bicycles
Policy C.28 Maximize bicycle access to all areas of the City, as practicable.

Program C.28.a Identify areas of the City where bikeways may be constructed, as both recreational and transportation amenities, with the aim of connecting all areas of the City with a network of bikeways.

Program C.28.b Design and install bikeways to meet best current engineering practices.

Policy C.29 Provide for the safety of bicyclists by dedicating bikeways where practicable, by installing appropriate signing and striping, and by maintaining the pavement.

Program C.29.a Install as many bikeways as can safely be accommodated and are economically feasible.

Policy C.30 Require new development and redevelopment to plan for and construct bikeways and/or bicycle parking facilities, as determined reasonable and practicable by the City.

Policy C.31 All new arterial streets and any existing arterials that are improved should provide for bicycle transportation.

Program C.31.a As a part of the budget and Capital Improvement Program development, seek opportunities to upgrade existing bikeways and to install new bikeways.

DRAFT

Page 98 of 151 ends

Attachment 3

Page 116 of 169 ends

VI-21
Policy C.32 Provide or require bicycle parking facilities at major destination points.

Program C.32.a Include bicycle lockers in park-and-ride facilities.

Program C.32.b Encourage business and employment centers to provide bicycle-parking facilities for their employees.

Program C.32.c Design and install bicycle-parking facilities to meet best current engineering practices.

Policy C.33 Provide public information on bicycle transportation.

Program C.33.a Promote bicycle use through a public information program, at special events, and through City publications.

Program C.33.b Establish an educational program on safe bicycle use.

Program C.33.c Make bicycle network maps available.

Pedestrians
Policy C.34 Maximize safe pedestrian facilities and access to all areas of the City, as reasonable and feasible.

Program C.34.a Identify sidewalks, walkways, and trails throughout the City to improve with pedestrian amenities as funds are made available; and continue to apply for new grant funding.

Program C.34.b Consider opportunities to enhance and expand pedestrian access between Central Brisbane, the Caltrain station, Sierra Point Marina and other regional destinations and transit connections.

Program C.34.b As part of the budget and Capital Improvement Program preparation, seek funding to upgrade and expand the system of pedestrian sidewalks, walkways and trails, especially in conjunction with street improvement projects.

Program C.34.c For newly designed and constructed sidewalks, disallow automobile parking thereon; and for existing sidewalks adjacent to rolled or vertical curbs, encourage residents to park such that sidewalks are kept clear for pedestrians in accordance with the Americans with Disabilities Act (ADA) width standards.

Program C.34.d Where practicable and where funds are available, establish and improve mid-block and block-end, public right-of-way pedestrian paths, in order to provide direct off-street pedestrian access between the upper and lower parts of Central Brisbane.

Policy C.35 Require pedestrian amenities with new development and expansion of existing uses, as appropriate.

Program C.35.a Adopt standard requirements for sidewalk improvements along property frontages, taking into consideration constraints imposed by topography, and where DRAFT

Page 99 of 151 ends

Attachment 3

Page 117 of 169 ends

VI-22
sidewalks are not appropriate, consider in-lieu fees for new development for funding pedestrian amenities elsewhere in the City.

Policy C.35.b Consider accepting sidewalk improvements beyond the frontage of a development site as a means to help mitigate traffic and parking impacts.

Transit
Brisbane has limited transit service, provided by regional agencies. This includes San Mateo County Transit District (SamTrans), Caltrain, and local shuttle service.

Given the high cost to construct new, fixed, mass transit systems such as BART, Caltrain and even light rail, there is an emphasis in this element on seeking to develop improved facilities and connections and improving the service network on the peninsula, with greater Brisbane service. However, the Baylands site includes the Bayshore Caltrain station and the opportunity exists to expand this facility into a multi-modal transit hub along the proposed extension of Geneva Avenue. This could potentially accommodate connections for Caltrain, SF Muni light rail, SamTrans, Bus Rapid Transit and various shuttles.

Transit is a regional issue and Brisbane fully supports and is involved with the regional agencies to promote and enhance transit, as reflected in the policies and programs below.

Policy C.36 Seek opportunities to install and improve transit facilities, establish multi-modal connections and increase the service network.

Program C.36.a Continue active participation in the implementation of the San Mateo County-wide Transportation Plan to improve circulation systems, to develop alternatives to automobile dependence and to make transportation-sensitive land use decisions.

Program C.36.b Request more frequent scheduling of Caltrain stops at the Bayshore station as warranted by demand.

Program C.36.c Support, improve, and expand transit to serve the business and residential communities and provide connections to major transportation hubs.

Program C.36.d Cooperate with San Mateo County Transit District (SamTrans), and other appropriate agencies, to establish bus rapid transit (BRT) systems where practicable.

Program C.36.e Cooperate with and provide input to transit agencies to provide increased bus scheduling to a greater network of destinations (especially to regional destinations, such as work, shopping, entertainment centers and medical facilities).

Program C.36.f Cooperate with and provide input to transit agencies to provide more comprehensive transfer connections with other bus routes outside of Brisbane and with other transit systems, such as Caltrain and BART.

Program C.36.g Work with SamTrans to install improvements at existing bus stops and designated routes.

Program C.36.h Provide information to citizens on the availability of transit.

DRAFT

Page 100 of 151 ends

Attachment 3

Page 118 of 169 ends

VI-23
Program C.36.i Require new development that are subject to the City’s transportation demand measures (TDM) ordinance to also incorporate measures that facilitate Complete Streets compliance measures, such as transit stops, shuttle stops, and bicycle facilities.

Policy C.37 Plan for park-and-ride facilities at the Caltrain Station and other major transit stops.

VI.5 TRANSPORTATION MANAGEMENT
Transportation management includes both transportation systems management (TSM) and transportation demand management (TDM). TSM is an approach to congestion mitigation that seeks to identify improvements to enhance the capacity of existing systems through operational measures. TDM includes strategies and measures that influence travel behaviors to improve the use of transportation system resources and the mobility and access for users. The underlying aim is to reduce single-occupant vehicle trips by offering more and better choices. This is especially effective for large employers to provide such things as shuttle and carpooling services to employees, offering incentives for employees to take transit, and incorporating physical infrastructure features, such as bike storage and shower and locker facilities, in the construction of new buildings or improvements to existing buildings.

Policy C.38 Continue participation in the efforts of subregional and regional transportation agencies to manage transportation systems.

Program C.38.a Continue active participation in the Congestion Management Program.

Program C.38.b Continue active participation in the Peninsula Traffic Congestion Relief Alliance Joint Powers Authority (Commute.org), as a means to cooperatively encourage residents and employees to reduce demand on transportation infrastructure.

Program C.38.c Provide information to citizens, employers, and employees on the alternatives to the single-occupant commute vehicle and the benefits of using the alternatives.

Program C.38.d Provide local incentives for participation in Transportation System Management (TSM) and Transportation Demand Management (TDM) programs and continue to implement same.

Program C.38.e Require Transportation System Management and Transportation Demand Management measures to help mitigate the traffic and parking impacts of development projects.

VI.6 PARKING
The availability of parking in Brisbane varies by the area and time of day. Drivers seeking to park in some areas of Central Brisbane may experience difficulties due to narrow roads where street parking is limited by the width of the street, relatively high density of development, and in certain cases a high level of automobile ownership, or lack of available on-site parking. On the other hand, some of the commercial areas may be considered to have an over-abundance of parking, especially during off-peak times.

Accordingly, the policies in the section are aimed at achieving the appropriate balance of parking, given the uses and the locations.

DRAFT

Page 101 of 151 ends

Attachment 3

Page 119 of 169 ends

VI-24
Included in this section is the continuation of minimum parking standards for new development throughout Brisbane, but also the establishment of maximum parking standards. This is intended to minimize paving to address stormwater runoff concerns, heat island effects, glare, and aesthetic concerns.

Policy C.39 Maintain as much on-street parking in residential Brisbane as can be accommodated safely.

Program C.39.a Periodically review residential parking requirements in the Zoning Ordinance, to maintain parking availability in Brisbane’s residential districts and to ensure consistency with the latest adopted Housing Element.

Program C.39.b Seek means to encourage residents to use their garages for vehicles rather than other purposes.

Policy C.40 Improve public parking opportunities in the Central Brisbane business district and other commercial areas, as appropriate.

Program C.40.a Consider opportunities to add public parking to underserved areas and investigate establishing a public parking lot or lots.

Program C.40.b Pursue, as feasible and needed, a downtown parking assessment district.

Policy C.41 Maintain an appropriate amount of off-street parking in commercial areas.

Program C.41.a Review the parking regulations for office, commercial and industrial uses and consider setting minimum and maximum parking standards where transit alternatives are readily available.

Policy C.42 Consider opportunities to add public parking to underserved areas and to provide parking/staging areas at public trailheads.

Policy C.43 Consider updates to the Brisbane Municipal Code to require parking lot solar canopies for energy generation and/or parking lot shade trees to reduce heat island effects on commercial development projects.

VI.7 CIRCULATION AND LAND USE
State law recognizes that circulation and land use are closely related and requires that these two components of a City’s General Plan be correlated. Through coordinated transportation and land use planning, the City will provide mobility Brisbane residents and businesses, including roadway capacity enhancements to accommodate traffic generated by planned future development within the City. Because the correlation of land use and transportation planning required by State law also encompasses considerations of energy efficiency and the need to reduce emissions of greenhouse gas and air pollutant emissions, the City’s Circulation Element policies are also intended to support efficient land use patterns that facilitate convenient access to regional transit facilities as well as bicycle and pedestrian connectivity through the City.

The land use and circulation policies in this General Plan also focus on ways to reduce the negative effects of automobile traffic at the local level on the City's residents and businesses. In essence, the policies are aimed at:

DRAFT

Page 102 of 151 ends

Attachment 3

Page 120 of 169 ends

VI-25
• Providing for a mix of jobs, housing and commercial services in the City to reduce the number of trips Brisbane residents are required to make outside the community to obtain essential services. • Providing for opportunities for pedestrians and bicyclists to reach all areas of the City and thus reduce dependence on the automobile for local trips.
• Generating a mix of uses to support transit facilities. • Accommodating uses with differing peak hour trips, to minimize impacts on existing and new streets and highways.
• Linking the development capacity of vacant lands to potential for provision of local transportation and circulation, the provision of transit facilities and participation in transportation systems management programs.
• Assuring adequate and safe access to properties.

The following policies address the relationship between land use and circulation:

Policy C.44 Consider potential effects on mobility and emergency evacuation in making land use decisions.

Policy C.45 For vacant subareas without existing infrastructure, require circulation plans and multi-modal transportation analyses to be submitted as a part of any development application.

Policy C.46 Consider transit use and facilities as well as Transportation Demand Management Programs in making land use decisions.

Policy C.47 Ensure legal access to properties in making land use decisions.

Program C.47a In reviewing building permit, subdivision and other development applications, distinguish whether the subject property has access from public streets, private streets, or easements. Obtain from applicants, evidence of a legal right of access to their properties. Require that such access meet applicable standards.

Policy C.48 In conjunction with new development and expansion of existing uses, require that new streets and any existing private streets serving the property be improved to City standards and offered for dedication as public streets.

Program C.48.a Continue to accept offers to dedicate existing private roadways as public streets, where they meet City standards.

Program C.48b Where appropriate, require exactions or impact fees for new development and improvements to property to improve substandard streets to minimum safety standards.

Program C.48.c Investigate requiring secondary access for long cul-de-sac streets.

DRAFT

Page 103 of 151 ends

Attachment 3

Page 121 of 169 ends

VI-26
Program C.48.d Investigate requiring mid-block turnarounds on all streets with cul-de-sacs longer than 500 feet.

Program C.48.e Investigate requiring that substandard intersections be improved, in conjunction with new development, to provide adequate turning radius.

Program C.48.f Consider an impact fee program to fund acquisition of additional rights-of-way, widening of existing streets to provide additional on-street parking and construction of other safety improvements.

Program C.48.g Continue to require parking and safety improvements in conjunction with new residential development and major additions or remodels that meet defined thresholds.

Program C.48.h Encourage the formation of assessment districts where appropriate, for needed circulation improvements.

Policy C.49 Monitor land use decisions under consideration by adjacent jurisdictions and their potential effect on Brisbane's streets. Comment through the public process and request mitigations as appropriate.

Policy C.50 Monitor regional developments and their effects on Highway 101, interchanges along the freeway, and Bayshore Boulevard to evaluate vehicular congestion from through traffic caused by developments approved by cities to the north and south of Brisbane.

Comment through the public process and request appropriate improvements to be provided within Brisbane from those developments.

VI.8 GREEN STREETS
Green Streets refers to the inclusion of landscape elements into the street right-of-way to help reduce storm water runoff by both interception and infiltration of rainwater and biological treatment of storm water by those landscape elements. The intended results are to help ease the burden, or flow volume, on storm water systems and to provide for improved water quality for that water that does enter the storm water systems. The specific landscape elements may take a variety of forms including, but not limited to, bio-treatment planters, rain gardens, street trees and other plantings.

Since the intent is to address stormwater quality, Green Streets elements may also be used in demonstrating compliance with the State Water Board provisions for low impact development (LID) and “Green Infrastructure”, subject to specific state provisions and design criteria where applicable. Low impact development is aimed at mimicking predevelopment hydrology by minimizing impervious cover, then bio-treating and infiltrating stormwater close to its source.

Green Streets are also a means to enhance the pedestrian experience of streetscapes and may be used in conjunction with “road diets”, to reduce existing, excessively wide roadways to provide for traffic calming and overall safer roadways. Given that, depending on the context, Green Streets may be a component of Complete Streets, in that these landscape features enhance the pedestrian and bicycle experience and thereby encourage all modes of travel.

Finally, Green Streets provide other ecological benefits, such as reduced heat island effects, improved air quality and wildlife islands or corridors.

DRAFT

Page 104 of 151 ends

Attachment 3

Page 122 of 169 ends

VI-27
The following policies and programs address Green Streets and are intended to integrate Green Streets principles and designs into the roadway network when possible:

Policy C.51 Incorporate Green Streets best practices, as appropriate to the context, for new streets and street retrofits, to enhance the pedestrian and bicyclist experience, to promote low impact development (LID) consistent with state water board initiatives to reduce the impacts of development on storm water resources and to enhance the natural environment. (See also the Complete Streets section) Program C.51.a Continue to evaluate and update the approved plant species list and standards for streetscape plantings.

Program C.51.b Consider where Green Streets retrofits may be incorporated into capital improvement projects and seek funding sources for Green Streets projects.

Policy C.52 For new multifamily, mixed use or commercial development projects subject to discretionary review, as part of the design review permit process, incorporate Green Streets, as determined reasonable and practicable by the City.

Policy C.53 In the design and approval of a specific Green Street, the following factors will be considered, as may be applicable:
• Context and design intent for the area or site;
• Site and environmental constraints such as soil type, sun and wind exposure, presence of utilities, view sight lines and view corridors; • On-going water needs and drought tolerance;
• Diversity of plantings to reduce the potential for mass die-offs due to pests or disease which may impact specific species;
• Adequate soil volume and location of the species within a storm water treatment unit, where applicable.

VI.9 ALTERNATIVE TRANSPORTATION MODES
Alternative transportation modes in this section refer to alternatives to fossil-fuel vehicles which have not already been addressed in the Complete Streets section, under the traditional categories of public transit, biking and walking. Use of alternative transportation modes has a historical precedent in Brisbane with such things as rail-spur lines for goods movement and the more recent City-sponsored car sharing service.

The programs in this section address continuation of the historic technology of rail lines for goods movement as well as incorporation of more recent and emerging technologies and sharing-based services into Brisbane’s circulation network.

Policy 54 Maintain existing and incorporate new alternative transportation modes and infrastructure into the circulation network as reasonable and practicable.

DRAFT

Page 105 of 151 ends

Attachment 3

Page 123 of 169 ends

VI-28
Program 54.a Consider revisions to the Brisbane Municipal Code to require vehicle charging stations for development projects.

Program 54.b Encourage the use of electric, fuel cell and other clean energy vehicles and provide charging stations at public facilities and encourage installation of charging stations at existing private sites, as reasonable and feasible.

Program 54.c Seek grant funding opportunities and other funding sources to install publicly accessible vehicle charging stations and other infrastructure to support and enhance alternative means of transportation.

Program 54.d Encourage the maintenance of existing rail-spur lines to continue their use in transporting goods. (See also policies and programs under the Transit section for public transportation)
Program 54.e Monitor and consider new technological advances such as driverless shuttles and how sharing based transportation (car and bike sharing) can be accommodated in the City’s circulation system.

VI.10 SAN FRANCISCO-SAN MATEO BI-COUNTY TRANSPORTATION STUDY The Bi-County Transportation Study was undertaken by the San Francisco County Transportation Authority (SFCTA) and the City/County Association of Governments of San Mateo County, along with the City of Brisbane, City/County of San Francisco, Peninsula Corridor Joint Powers Board (Caltrain), and others to assess the transportation improvements needed to support development of approximately 15,000 new housing units and over 14 million square feet of new employment uses proposed within the southeastern corner of San Francisco and the northeastern corner of San Mateo County. The study includes a listing of transportation projects along the San Francisco/San Mateo county line and a funding strategy.

The final report for the Bi-County Study, which was prepared in 2013, recommended the following transportation improvements:
• US 101 Candlestick Interchange Re-Configuration
• Geneva Avenue Extension from Bayshore Boulevard to the US 101 freeway • Harney-Geneva Bus Rapid Transit Line
• T-Third Light Rail Extension (Segment “S”)
• Bayshore Station Re-Configuration
• Bicycle-Pedestrian Connections
• Area-Wide Traffic Calming Program
In 2019, theThe City of Brisbane began is working with the other agencies involved in the Bi-County Transportation Study to update the land use and development assumptions used in the 2013 study and DRAFT

Page 106 of 151 ends

Attachment 3

Page 124 of 169 ends

VI-29
review the report’s recommendations to determine whether any revisions to the list of transportation improvements might be appropriate.

REFERENCES

1. See also, Brisbane Traffic Management and Capacity Study Update. Wilbur Smith Assoc., April 1993.

2. See Chapter X, Community Health and Safety, for more information on circulation-related safety and utility issues.

3. See Brisbane Baylands Draft Environmental Impact Report, Chapter 4.N, State Clearinghouse #2006022136, ESA, June 2013.

DRAFT

Page 107 of 151 ends

Attachment 3

Page 125 of 169 ends

C a l Tr a i n

SAN FRANCISCO
SIE
RRA
POINT
SAN
TA
CLA
RA
GLEN
PARK
MISS
OI N
BLU
E

SANBE NITO

VENTURA

CH ECKER
SPOT
SOLANO
SILVE
RSPOT
ALLEY

ALVAR ADO
SAN
BENITO
MAIN
OLD
COUNTY

VISITACION

S A NBRUNO

MARIPOSA

TANAGER

ALVARADO
PARK

TRINITY

ROC KWREN

BAYSHORE
SIERR
POI
A
NT
SAN
MATEO
INYO

KLAMATH
ELFIN
MAIN
LILY
HARNEY
HARNEY
ANNIS

SIERRA POINT

BUTTERWE
E
D

SIERRAPOINT

MONTEREY
H UMBO
LDT
VALLEY
QUARRY

GUADALUPE CANYON
ALA
NA

ELDERBERRY
THOMAS

MISSION
BLUE

NORTH HILL

MONTEREY
ANNIS
JOY

CYPRESS
PARK
LAKE
MARIN
KI NGS

KLAMATH
TU
LAR E

MARGAR E T
TANK

HUCKLEBERRY

SOUTH HILL

WEST HILL
WEST
HILL

SHORELINE

BEATR ICE
MCLAIN

MARGARE
T
PAUL

GOLDENASTER

CA LLIPPE

MONARCH
TR IN
I
YT

MISSION BLUE
BEATTY
Quarry
HAROLD
GENEVA
MARINA
VALLEY

VAN WATERS
& RODGERS
SI
E R RA
PO INT

MENDOCINO
F OX

S PA RROW
Esri, NASA, NGA, USGS, FEMA, Vantor
\
0 500
1,0001,5002,000
Feet
Figure C-3
Proposed
Circulation Improvements
City Limits
Freeway
Principal Arterial
Minor Arterial
Major Collector
Local
Private
Road Classifications
05/13/2026
Baylands Specific Plan (BSP) Area
See Figure C-4 for street
classifications within the
Baylands Subarea
DRAFT

Page 108 of 151 ends

Attachment 3

Page 126 of 169 ends

\
0 500
1,000
1,500
2,000
Feet
Figure C-4
Street Classifications within
the Baylands Subarea
05/13/2026
DRAFT

Page 109 of 151 ends

Attachment 3

Page 127 of 169 ends

Resolution PC-01-26
PLANNING COMMISSION RESOLUTION NO. PC-01-26

A RESOLUTION OF THE PLANNING COMMISSION OF

THE CITY OF BRISBANE, CALIFORNIA, RECOMMENDING CITY COUNCIL TO

ADOPT THE BAYSHORE MOBILITY PLAN, AS MODIFIED, PURSUANT TO GENERAL PLAN CIRCULATION ELEMENT POLICY C.1 AND PROGRAM C.1.B
WHEREAS, The Baylands Specific Plan area encompasses approximately 684.3 acres within the City of Brisbane in northeast San Mateo County, approximately 449 acres of which is owned by Sunquest Properties, Inc. and managed by Baylands Development, Inc. (collectively, “BDI”); and
WHEREAS, in 2005, BDI submitted a specific plan to the City proposing development of approximately 449 acres of the Baylands; and
WHEREAS, in 2011, BDI submitted a revised specific plan that proposed 4,434 residential units, approximately seven million square feet of commercial development, and approximately 169.7 acres of open space; and
WHEREAS, in 2013, a Draft Environmental Impact Report for the 2011 Specific Plan was made available for public review from June 11, 2013, to January 24, 2014; and WHEREAS, on July 18, 2018, the Brisbane City Council certified the Brisbane Baylands Final Program EIR in accordance with the provisions of CEQA for implementation of General Plan Amendment GP-1-18; and
WHEREAS, on July 18, 2018, the Brisbane City Council adopted Resolution 2018-62, approving General Plan Amendment GP-1-18 to amend various provisions of the General Plan related to the Brisbane Baylands General Plan Subarea to allow for a range of 1800–2200 dwelling units and up to 6.5 million square feet of new commercial development, and 500,000 square feet of hotel development, subject to City approval of a specific plan consistent with policies established in GP-1-18; and
WHEREAS, General Plan Amendment GP-1-18 was approved by City of Brisbane voters as Measure JJ in the November 6, 2018, Brisbane elections; and WHEREAS, on January 16, 2020, the City Council adopted General Plan Amendment GP-1-19 to implement GP-1-18 and Measure JJ, and the City Council certified an Addendum to the Brisbane Baylands Final Program EIR pursuant to the requirements of CEQA Guidelines § 15164; and
WHEREAS, General Plan Amendment GP-1-19 states that the City’s roadway system is to be designed “to emphasize mobility for Brisbane residents and businesses, accommodate bicycle and pedestrian in addition to vehicular movement, and provide for comfortable and safe travel within the community to shopping, employment, and recreation, as well as to transit and the Highway 101 freeway.”

Page 110 of 151 ends

Attachment 3

Page 128 of 169 ends

Resolution PC-01-26
WHEREAS, General Plan Program C.1.b calls for a plan to reconfigure Bayshore Boulevard that addresses the “effects of regional through traffic within Brisbane and enhances mobility for Brisbane residents and businesses through a combination of roadway and intersection, transit, bicycle, and pedestrian facility improvements that would not cause a substantial increase in vehicle miles traveled (VMT) on Bayshore Boulevard or other routes through the City”; and
WHEREAS, on February 20, 2020, the City distributed a Notice of Preparation (NOP) for an EIR for a project including a revised Brisbane Baylands Specific Plan from the project applicant, which necessarily included preparing a Bayshore Mobility Plan to implement General Plan Program C.1.b, opening a 60-day response period; and WHEREAS, pursuant to CEQA Guidelines Section 15082(c)(1), the City of Brisbane held a public scoping meeting for the Draft EIR on March 4, 2020, to provide an opportunity for members of the public and public agencies to provide input on the scope and content of the environmental information and analysis to be included in the EIR for the proposed Baylands Specific Plan; and
WHEREAS, in January 2023, the applicant submitted a revised Specific Plan to supersede the 2011 Specific Plan; and
WHEREAS, on April 26, 2023, the City distributed an updated NOP for the EIR, and provided a 30-day response period starting on April 26, 2023; and WHEREAS, a second scoping meeting for the Draft EIR was held on May 9, 2023, and the updated NOP response period ended on May 25, 2023; and WHEREAS, on April 3, 2025, the City of Brisbane published a revised draft Brisbane Baylands Specific Plan; and
WHEREAS, on April 3, 2025, the City of Brisbane published the Draft Environmental Impact Report for the Brisbane Baylands Specific Plan Project (“Draft EIR”), which included the Bayshore Mobility Plan in its project description in Section 3.3.4 – Bayshore Mobility Plan; and WHEREAS, also on April 3, 2025, the City of Brisbane released a Notice of Availability/Notice of Completion for the Draft EIR, notifying the public and agencies of a 151- day public review period that ran from April 3, 2025, to September 2, 2025; and WHEREAS, the Notice of Availability also discussed the availability of the Draft EIR Appendices, which included a copy of the draft Bayshore Mobility Plan (Appendix F to Draft EIR Appendix F.1); and
WHEREAS, the Bayshore Mobility Plan was prepared to meet the directives of General Plan Amendment GP-1-19 and General Plan Circulation Element Policy C.1 and Program C.1.b.

More specifically, General Plan Policy C.1 calls for the City’s roadway system to be designed “to emphasize mobility for Brisbane residents and businesses, accommodate bicycle and pedestrian in addition to vehicular movement, and provide for comfortable and safe travel within the community to shopping, employment, and recreation, as well as to transit and the Highway

Page 111 of 151 ends
← All documents from this meeting