Office Bulletin #25-07 R3
needed to establish or increase a credit line with the material supplier A request for a joint check agreement may be initiated by any party. If a joint check is used, the DBE remains responsible for all elements of 49 CFR 26.55(c)(1).
Failure to comply with the above requirements disqualifies DBE participation and results in no credit and no payment to the Contractor for DBE participation.
A joint check may not be used between the Contractor or subcontractor and a DBE regular dealer, bulk material supplier, manufacturer, wholesaler, broker, trucker, packager, manufacturer’s representative, or other persons who arrange or expedite transactions.
2. BID OPENING
The Agency publicly opens and reads bids at the time and place shown on the Notice to Contractors.
3. BID RIGGING
The U.S. Department of Transportation (DOT) provides a toll-free hotline to report bid rigging activities. Use the hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number is (800) 424- 9071. The service is available 24 hours 7 days a week and is confidential and anonymous. The hotline is part of the DOT's effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General.
4. CONTRACT AWARD
If the Agency awards the contract, the award is made to the lowest responsible and responsive bidder.
5. CONTRACTOR LICENSE
The Contractor must be properly licensed as a contractor from contract award through Contract acceptance (23 CFR 635.110).
6. CHANGED CONDITIONS
A. Differing Site Conditions
1. During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed.
2. Upon written notification, the engineer will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The engineer will notify the contractor of the determination whether or not an adjustment of the contract is warranted.
3. No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor has provided the required written notice.
4. No contract adjustment will be allowed under this clause for any effects caused on unchanged work. [This provision may be omitted by the Local Agency, at their option.] B. Suspensions of Work Ordered by the Engineer
1. If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment.
2. Upon receipt, the engineer will evaluate the contractor's request. If the engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
an adjustment (excluding profit) and modify the contract in writing accordingly. The contractor will be notified of the engineer's determination whether or not an adjustment of the contract is warranted.
3. No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed.
4. No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract.
C. Significant Changes in the Character of Work
1. The engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered.
2. If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair andequitable.
3. If the alterations or changes in quantities do not significantly change the character of the work to be performed under the contract, the altered work will be paid for as provided elsewhere in the contract.
4. The term “significant change” shall be construed to apply only to the following circumstances:
• When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction; or
• When a major item of work, as defined elsewhere in the contract, is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in case of a decrease below 75 percent, to the actual amount of work performed.
7. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES The Contractor shall begin work within 15 calendar days after the issuance of the Notice to Proceed.
This work shall be diligently prosecuted to completion before the expiration of WORKING DAYS beginning on the fifteenth calendar day after the date shown on the Notice to Proceed.
The Contractor shall pay to the City/County the sum of $ per day, for each and every calendar days’ delay in finishing the work in excess of the number of working days prescribed above.
8. BUY AMERICA
[Include the Buy America provisions below when required by LAPM Chapter 12] Buy America Requirements apply to iron or steel, manufactured products, and construction materials permanently incorporated into the project.
Buy America requirements do not apply to the following:
1. Tools and construction equipment used in performing the work
2. Temporary work that is not incorporated into the finished project An article, materials, or supply to be permanently incorporated in the project should only be classified into one of the following categories:
1. Iron or steel products
2. Manufactured products
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
3. Construction materials
4. Excluded materials
Excluded materials means cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.
Iron or Steel Products
All iron or steel products permanently incorporated into the project must be melted and manufactured in the United States except:
1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials [60 Fed Reg 15478 (03/24/1995)];
2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total contract amount or $2,500, materials produced outside the United States may be used if authorized.
Iron or steel products are defined as articles, materials, or supplies that consist wholly or predominantly of iron or steel or a combination of both.
For a product to be considered to consist predominantly of iron or steel, or a combination of both means the cost of the iron or steel content of the product exceeds 50 percent of the total cost of all its components. The cost of iron or steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components.
Furnish iron or steel products to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the iron or steel were melted and manufactured. All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied.
[Delete the paragraph below if not applicable]
The following iron or steel products have received an approved Buy America waiver for this project and are therefore not subject to Buy America requirements:
1. ________________________
2. ________________________
Manufactured Products
All manufactured products permanently incorporated into the project must be manufactured in the United States.
Manufactured products are defined as articles, materials, or supplies that have been:
1. Processed into a specific form and shape; or
2. Combined with other articles, materials, or supplies to create a product with different properties than the individual articles, materials, or supplies.
Manufacturer, in the case of manufactured products, means the entity that performs the final manufacturing process by bringing individual elements together that produces a manufactured product.
If an item is classified as an iron or steel product, a construction material, or an excluded material, then it is not a manufactured product. However, an article, material, or supply classified as a manufactured product may include components that are iron or steel products, construction materials, or excluded materials.
Iron or steel used in precast concrete manufactured products or Intelligent Transportation Systems (ITS) must meet the requirements of Iron or Steel Products regardless of the amount used.
Iron and steel used in other manufactured products must meet the requirements of section Iron or Steel Products if the cost of steel and iron components is 50 percent or more of the total cost of the manufactured product.
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
Furnish manufactured products to be permanently incorporated into the work with certificates of compliance with each project delivery. The manufacturer's certificate of compliance must identify where the manufacturing occurred and attest specifically to Buy America compliance. [Delete the paragraph below if not applicable]
The following manufactured products have received an approved Buy America waiver for this project and are therefore not subject to Buy America requirements:
1. ________________________
2. ________________________
Construction Materials
Construction materials permanently incorporated into the project must be manufactured as defined in 2 CFR 184.6 in the United States.
Buy America requirements apply to the following construction materials that are or consist primarily of:
1. Non-ferrous metals
2. Plastic and polymer-based products such as:
2.1 Polyvinylchloride
2.2 Composite Building Materials
3. Glass
4. Fiber optic cable (including drop cable)
5. Optical fiber
6. Lumber
7. Engineered wood
8. Drywall
Minor additions of articles, materials, supplies, or binding agents to these construction materials do not change the categorization of the construction material.
Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. The manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to Buy America compliance. [Delete the paragraph below if not applicable]
The following construction materials have received an approved Buy America waiver for this project and are therefore not subject to Buy America requirements:
1. ________________________
2. ________________________
Buy America Waiver for De Minimis Cost for Manufactured Products and Construction Materials A De Minimis Cost Waiver can waive the application of FHWA’s Buy America requirements for manufactured products and construction materials under a single project when the total value of non-compliant manufactured products and construction materials is no more that the lesser of $1,000,000 or 5 percent of the total applicable material costs for the project.
The percent threshold is calculated based on the following formula:
X = NC / TA
where:
X = percent threshold
NC = total value of non-compliant manufactured products and construction material TA = total applicable project costs (iron or steel products, manufactured products, and construction materials; does not include excluded materials)
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
This threshold is based on the actual cost of the iron or steel products, manufactured products, and construction materials, not the anticipated cost of those materials. Compliant and non-compliant Agency Furnished Materials for the project must be accounted for in a De Minimis Cost Waiver Worksheet calculation, if provided by the Local Agency.
Provide copies of invoices for the actual costs of materials including transportation to the project site.
In applying a De Minimum Cost Waiver, total cost of non-compliant construction materials and manufactured products does not include the cost of any products subject to a separate Buy America waiver.
If De Minimis Cost Waiver Worksheet calculation for materials subject to Buy America is not submitted, the Local Agency may:
1. Withhold from the next progress payment
2. Reject your request for a De Minimis Costs waiver for non-compliant construction materials or manufactured products
9. QUALITY ASSURANCE
The Local Agency uses a Quality Assurance Program (QAP) to ensure a material is produced to comply with the Contract. The Local Agency may examine the records and reports of tests the prime contractor performs if they are available at the job site. Schedule work to allow time for QAP.
10. PROMPT PAYMENT
A. FROM THE AGENCY TO THE CONTRACTORS
The Local Agency shall make all project progress payment within 30 days after receipt of an undisputed and properly submitted payment request from the Contractor on a construction contract. If the Local Agency fails to pay promptly, the Local Agency shall pay interest to the Contractor, which accrues at the rate of 10 percent per annum on the principal amount of a money judgment remaining unsatisfied and pro-rated as necessary. Upon receipt of the payment request, the Local Agency shall act in accordance with both of the following:
1. The Local Agency shall review each payment request as soon as feasible after receipt to verify it is a proper payment request.
2. The Local Agency must return any payment request deemed improper by the Local Agency to the Contractor as soon as feasible, but not later than seven (7) days, after receipt. A request returned pursuant to this paragraph shall include documentation setting forth in writing the reasons why it is an improper payment request.
B. SUBMITTAL OF EXHIBIT 9-P
In accordance with California Business and Professions Code section 7108.5, the prime contractor or subcontractor shall pay to any subcontractor, not later than seven days after receipt of each progress payment, unless otherwise agreed to in writing, the respective amounts allowed the contractor on account of the work performed by the subcontractors, to the extent of each subcontractor’s interest therein. In the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the prime contractor or subcontractor to a subcontractor, the prime contractor or subcontractor may withhold no more than 150 percent of the disputed amount. Any violation of this requirement shall constitute a cause for disciplinary action and shall subject the licensee to a penalty, payable to the subcontractor, of 2 percent of the amount due per month for every month that payment is not made.
In any action for the collection of funds wrongfully withheld, the prevailing party shall be entitled to his or her attorney’s fees and costs. The sanctions authorized under this requirement shall be separate from, and in addition to, all other remedies, either civil, administrative, or criminal.
For projects awarded on or after September 1, 2023:
The Contractor must submit Exhibit 9-P to the Local Agency administering the contract by the 15th of the month following the month of any payment(s). If the Contractor does not make any payments to subcontractors, supplier(s) and/or manufacturers they must report “no payments were made to subs this month” and write this visibly and legibly on Exhibit 9-P.
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
The Local Agency must verify all Exhibit 9-P information, monitor compliance with prompt payment requirements for DBE and non-DBE firms, and address any shortfall to the DBE commitment and prompt payment issues until the end of the project. The Local Agency must email a copy of Exhibit 9-P to [email protected] before the end of the month after receiving the Exhibit 9-P from the Contractor.
11. FORM FHWA-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONTRACTS [Form FHWA-1273 must be physically inserted into the contract without modification, excluding ATTACHMENT
A - EMPLOYMENT AND MATERIALS PREFERENCE FOR APPALACHIAN DEVELOPMENT HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS ROAD CONTRACTS.]
[The current version of Form FHWA-1273 is accessible at FHWA’s website:
https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf]
12. FEMALE AND MINORITY GOALS
To comply with Section II, "Nondiscrimination," of "Required Contract Provisions Federal-Aid Construction Contracts," the following are for female and minority utilization goals for Federal-aid construction contracts and subcontracts that exceed $10,000:
The nationwide goal for female utilization is 6.9 percent.
The goals for minority utilization (45 Fed Reg 65984 (10/3/1980)) are as follows:
MINORITY UTILIZATION GOALS
Economic
Area
Goal
(Percent)
174 Redding CA:
Non-SMSA (Standard Metropolitan Statistical Area) Counties:
CA Lassen; CA Modoc; CA Plumas; CA Shasta; CA Siskiyou; CA Tehama
6.8 175
Eureka, CA
Non-SMSA Counties:
CA Del Norte; CA Humboldt; CA Trinity
6.6 San Francisco-Oakland-San Jose, CA:
28.9 25.6
19.6 14.9
9.1 17.1
23.2 SMSA Counties:
7120 Salinas-Seaside-Monterey, CA
CA Monterey
7360 San Francisco-Oakland
CA Alameda; CA Contra Costa; CA Marin; CA San Francisco; CA San Mateo 7400 San Jose, CA
176 CA Santa Clara, CA
7485 Santa Cruz, CA
CA Santa Cruz
7500 Santa Rosa
CA Sonoma
8720 Vallejo-Fairfield-Napa, CA
CA Napa; CA Solano
Non-SMSA Counties:
CA Lake; CA Mendocino; CA San Benito
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
177
Sacramento, CA:
SMSA Counties:
6920 Sacramento, CA
CA Placer; CA Sacramento; CA
Yolo Non-SMSA Counties
CA Butte; CA Colusa; CA El Dorado; CA Glenn; CA Nevada; CA Sierra; CA Sutter; CA Yuba
16.1 14.3
Stockton-Modesto, CA:
SMSA Counties:
5170 Modesto, CA 12.3
178 CA Stanislaus
8120 Stockton, CA 24.3
CA San Joaquin
Non-SMSA Counties 19.8
CA Alpine; CA Amador; CA Calaveras; CA Mariposa; CA Merced; CA Tuolumne Fresno-Bakersfield, CA
SMSA Counties:
179 0680 Bakersfield, CA 19.1
CA Kern
2840 Fresno, CA
CA Fresno
Non-SMSA Counties:
CA Kings; CA Madera; CA Tulare
26.1 23.6
Los Angeles, CA:
11.9 28.3
21.5 19.0
19.7 24.6
SMSA Counties:
0360 Anaheim-Santa Ana-Garden Grove, CA
CA Orange
4480 Los Angeles-Long Beach, CA
CA Los Angeles
180 6000 Oxnard-Simi Valley-Ventura, CA
CA Ventura
6780 Riverside-San Bernardino-Ontario, CA
CA Riverside; CA San Bernardino
7480 Santa Barbara-Santa Maria-Lompoc, CA
CA Santa Barbara
Non-SMSA Counties
CA Inyo; CA Mono; CA San Luis Obispo
San Diego, CA:
16.9 18.2
SMSA Counties
181 7320 San Diego, CA
CA San Diego
Non-SMSA Counties
CA Imperial
For the last full week of July during which work is performed under the contract, the prime contractor and each non material-supplier subcontractor with a subcontract of $10,000 or more must complete Form FHWA PR-1391 (Appendix C to 23 CFR 230). Submit the forms by August 15.
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
13. TITLE VI ASSURANCES
[The U.S. Department of Transportation Order No.1050.2A requires all federal-aid Department of Transportation contracts between an agency and a contractor to contain Appendix A and E.
Note: Appendix B only requires inclusion if the contract impacts deeds effecting or recording the transfer of real property, structures, or improvements thereon, or granting interest therein. Appendices C and D only require inclusion if the contract impacts deeds, licenses, leases, permits, or similar instruments entered into by the recipient.]
APPENDIX A
During the performance of this Agreement, the contractor, for itself, its assignees and successors in interest (hereinafter collectively referred to as CONTRACTOR) agrees as follows:
a. Compliance with Regulations: CONTRACTOR shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the REGULATIONS), which are herein incorporated by reference and made a part of this agreement. b. Nondiscrimination: CONTRACTOR, with regard to the work performed by it during the AGREEMENT, shall not discriminate on the grounds of race, color, sex, national origin, religion, age, or disability in the selection and retention of sub-applicants, including procurements of materials and leases of equipment. CONTRACTOR shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the agreement covers a program set forth in Appendix B of the Regulations. c. Solicitations for Sub-agreements, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by CONTRACTOR for work to be performed under a Sub- agreement, including procurements of materials or leases of equipment, each potential sub-applicant or supplier shall be notified by CONTRACTOR of the CONTRACTOR’S obligations under this Agreement and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.
d. Information and Reports: CONTRACTOR shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the recipient or FHWA to be pertinent to ascertain compliance with such Regulations or directives. Where any information required of CONTRACTOR is in the exclusive possession of another who fails or refuses to furnish this information, CONTRACTOR shall so certify to the recipient or FHWA as appropriate, and shall set forth what efforts CONTRACTOR has made to obtain the information. e. Sanctions for Noncompliance: In the event of CONTRACTOR’s noncompliance with the nondiscrimination provisions of this agreement, the recipient shall impose such agreement sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:
i. withholding of payments to CONTRACTOR under the Agreement within a reasonable period of time, not to exceed 90 days; and/or
ii. cancellation, termination or suspension of the Agreement, in whole or in part. f. Incorporation of Provisions: CONTRACTOR shall include the provisions of paragraphs (1) through (6) in every sub-agreement, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto.
CONTRACTOR shall take such action with respect to any sub-agreement or procurement as the recipient or FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance, provided, however, that, in the event CONTRACTOR becomes involved in, or is threatened with, litigation with a subapplicant or supplier as a result of such direction, CONTRACTOR may request the recipient enter into such litigation to protect the interests of the State, and, in addition, CONTRACTOR may request the United States to enter into such litigation to protect the interests of the United States.
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
APPENDIX B
CLAUSES FOR DEEDS TRANSFERRING UNITED STATES PROPERTY
The following clauses will be included in deeds effecting or recording the transfer of real property, structures, or improvements thereon, or granting interest therein from the United States pursuant to the provisions of Assurance 4:
NOW THEREFORE, the U.S. Department of Transportation as authorized by law and upon the condition that the recipient will accept title to the lands and maintain the project constructed thereon in accordance with Title 23 U.S.C., the regulations for the administration of the preceding statute, and the policies and procedures prescribed by the FHWA of the U.S. Department of Transportation in accordance and in compliance with all requirements imposed by Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation pertaining to and effectuating the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252; 42 U.S.C. § 2000d to 2000d-4), does hereby remise, release, quitclaim and convey unto the recipient all the right, title and interest of the U.S. Department of Transportation in and to said lands described in Exhibit A attached hereto and made a part hereof.
(HABENDUM CLAUSE)
TO HAVE AND TO HOLD said lands and interests therein unto the recipient and its successors forever, subject, however, to the covenants, conditions, restrictions and reservations herein contained as follows, which will remain in effect for the period during which the real property or structures are used for a purpose for which Federal financial assistance is extended or for another purpose involving the provision of similar services or benefits and will be binding on the recipient, its successors and assigns. The recipient, in consideration of the conveyance of said lands and interest in lands, does hereby covenant and agree as a covenant running with the land for itself, its successors and assigns, that (1) no person will on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination with regard to any facility located wholly or in part on, over, or under such lands hereby conveyed [,] [and]* (2) that the recipient will use the lands and interests in lands and interest in lands so conveyed, in compliance with all requirements imposed by or pursuant to Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the U.S. Department of Transportation, Effectuation of Title VI of the Civil Rights Act of 1964, and as said Regulations and Acts may be amended[, and (3) that in the event of breach of any of the above-mentioned non-discrimination conditions, the Department will have a right to enter or re-enter said lands and facilities on said lands, and that above described land and facilities will thereon revert to and vest in and become the absolute property of the U.S. Department of Transportation and its assigns as such interest existed prior to this instruction].* (*Reverter clause and related language to be used only when it is determined that such a clause is necessary in order to make clear the purpose of Title VI.)
APPENDIX C
CLAUSES FOR TRANSFER OF REAL PROPERTY ACQUIRED OR IMPROVED UNDER THE
ACTIVITY, FACILITY, OR PROGRAM
The following clauses will be included in deeds, licenses, leases, permits, or similar instruments entered into by the recipient pursuant to the provisions of Assurance 7(a):
A. The (grantee, lessee, permittee, etc. as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree [in the case of deeds and leases add “as a covenant running with the land”] that:
1. In the event facilities are constructed, maintained, or otherwise operated on the property described in this (deed, license, lease, permit, etc.) for a purpose for which a U.S. Department of Transportation Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
activity, facility, or program is extended or for another purpose involving the provision of similar services or benefits, the (grantee, licensee, lessee, permittee, etc.) will maintain and operate such facilities and services in compliance with all requirements imposed by the Acts and Regulations (as may be amended) such that no person on the grounds of race, color, or national origin, will be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities.
B. With respect to licenses, leases, permits, etc., in the event of breach of any of the above Nondiscrimination covenants, the recipient will have the right to terminate the (lease, license, permit, etc.) and to enter, re-enter, and repossess said lands and facilities thereon, and hold the same as if the (lease, license, permit, etc.) had never been made or issued.*
C. With respect to a deed, in the event of breach of any of the above Non-discrimination covenants, the recipient will have the right to enter or re-enter the lands and facilities thereon, and the above described lands and facilities will there upon revert to and vest in and become the absolute property of the recipient and its assigns.*
(*Reverter clause and related language to be used only when it is determined that such a clause is necessary to make clear the purpose of Title VI.)
APPENDIX D
CLAUSES FOR CONSTRUCTION/USE/ACCESS TO REAL PROPERTY ACQUIRED UNDER THE
ACTIVITY, FACILITY OR PROGRAM
The following clauses will be included in deeds, licenses, permits, or similar instruments/agreements entered into by the recipient pursuant to the provisions of Assurance 7(b):
A. The (grantee, licensee, permittee, etc., as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest ,and assigns, as a part of the consideration hereof, does hereby covenant and agree (in the case of deeds and leases add, “as a covenant running with the land”) that (1) no person on the ground of race, color, or national origin, will be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities, (2) that in the construction of any improvements on, over, or under such land, and the furnishings of services thereon, no person on the ground of race, color, or national origin, will be excluded from participation in, denied the benefits or, or otherwise be subjected to discrimination, (3) that the (grantee, licensee, lessee, permittee, etc.) will use the premises in compliance with all other requirements imposed by or pursuant to the Acts and Regulations, as amended, set forth in this Assurance.
B. With respect to (licenses, leases, permits, etc.) in the event of breach of any of the above of the above Non-discrimination covenants, the recipient will have the right to terminate the (license, permits, etc., as appropriate) and to enter or re-enter and repossess said land and the facilities thereon, and hold the same as if said (license, permit, etc., as appropriate) had never been made or issued.* C. With respect to deeds, in the event of breach of any of the above Non-discrimination covenants, the recipient will there upon revert to and vest in and become the absolute property of the recipient and its assigns.
(*Reverter clause and related language to be used only when it is determined that such a clause is necessary to make clear the purpose of Title VI.)
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
APPENDIX E
During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “contractor”) agrees to comply with the following non-discrimination statutes and authorities, including, but not limited to:
Pertinent Non-Discrimination Authorities:
• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);
• Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), prohibits discrimination on the basis of sex; • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CR Part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), prohibits discrimination on the basis of age);
• Airport and Airway Improvement Act of 1982, (49 U.S.C. § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not);
• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination of the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131 – 12189) as implemented by Department of Transportation regulations 49 C.F.R. parts 37 and 38;
• The Federal Aviation Administration’s Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); • Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and LowIncome Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); • Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
Federal Trainee Program Special Provisions
[to be used when applicable]
14. FEDERAL TRAINEE PROGRAM
For the Federal training program, the number of trainees or apprentices is .
This section applies if a number of trainees or apprentices is shown on the Notice of Bidders.
As part of the prime contractor’s equal opportunity affirmative action program, provide on-the-job training to develop full journeymen in the types of trades or job classifications involved.
The prime contractor has primary responsibility for meeting this training requirement.
If the prime contractor subcontracts a contract part, they shall determine how many trainees or apprentices are to be trained by the subcontractor. Include these training requirements in each subcontract.
Where feasible, 25 percent of apprentices or trainees in each occupation must be in their 1st year of apprenticeship or training.
Distribute the number of apprentices or trainees among the work classifications on the basis of the prime contractor’s needs and the availability of journeymen in the various classifications within a reasonable recruitment area.
Before starting work, the prime contractor shall submit to the City/County of :
1. Number of apprentices or trainees to be trained for each classification
2. Training program to be used
3. Training starting date for each classification
The prime contractor shall obtain the City/County of approval for this submitted information before the prime contractor starts work. The City/County of credits the prime contractor for each apprentice or trainee the prime contractor employs on the job who is currently enrolled or becomes enrolled in an approved program.
The primary objective of this section is to train and upgrade minorities and women toward journeyman status.
The prime contractor shall make every effort to enroll minority and women apprentices or trainees, such as conducting systematic and direct recruitment through public and private sources likely to yield minority and women apprentices or trainees, to the extent they are available within a reasonable recruitment area and show that they have made the efforts. In making these efforts, the prime contractor shall not discriminate against any applicant for training.
The prime contractor shall not employ as an apprentice or trainee an employee:
1. In any classification in which the employee has successfully completed a training course leading to journeyman status or in which the employee has been employed as a journeyman
2. Who is not registered in a program approved by the US Department of Labor, Bureau of Apprenticeship and Training
The prime contractor shall ask the employee if the employee has successfully completed a training course leading to journeyman status or has been employed as a journeyman. The prime contractor’s records must show the employee's answers to the questions.
In the training program, the prime contractor shall establish the minimum length and training type for each classification. The City/County of and FHWA approves a program if one of the following is met:
1. It is calculated to:
• Meet the equal employment opportunity responsibilities • Qualify the average apprentice or trainee for journeyman status in the classification involved by the end of the training period
2. It is registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training, and it is administered in a way consistent with the equal employment responsibilities of Federal-aid highway construction contracts
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
The prime contractor shall obtain the State's approval for their training program before they start work involving the classification covered by the program.
The prime contractor shall provide training in the construction crafts, not in clerk-typist or secretarial-type positions. Training is allowed in lower-level management positions such as office engineers, estimators, and timekeepers if the training is oriented toward construction applications. Training is allowed in the laborer classification if significant and meaningful training is provided and approved by the division office. Off-site training is allowed if the training is an integral part of an approved training program and does not make up a significant part of the overall training.
The City/County of reimburses the prime contractor 80 cents per hour of training given an employee on thiscontract under an approved training program:
1. For on-site training
2. For off-site training if the apprentice or trainee is currently employed on a Federal-aid project and prime contractor does at least one of the following:
a. Contribute to the cost of the training
b. Provide the instruction to the apprentice or trainee c. Pay the apprentice's or trainee's wages during the off-site training period
3. If the prime contractor complies with this section.
Each apprentice or trainee must:
1. Begin training on the project as soon as feasible after the start of work involving the apprentice's or trainee's skill
2. Remain on the project as long as training opportunities exist in the apprentice's or trainee's work classification or until the apprentice or trainee has completed the training program Furnish the apprentice or trainee a:
1. Copy of the training plan approved by the U.S, Department of Labor or a training plan for trainees approved by both Caltrans and FHWA
2. Certification showing the type and length of training satisfactorily completed Maintain records and submit reports documenting contractor’s performance under this section.
15. PROHIBITION OF CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE EQUIPMENT AND
SERVICES
In response to significant national security concerns, the agency shall check the prohibited vendor list before making any telecommunications and video surveillance purchase because recipients and subrecipients of federal funds are prohibited from obligating or expending loan or grant funds to:
• Procure or obtain;
• Extend or renew a contract to procure or obtain; or
• Enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.
The prohibited vendors (and their subsidiaries or affiliates) are:
• Huawei Technologies Company;
• ZTE Corporation;
• Hytera Communications Corporation;
• Hangzhou Hikvision Digital Technology Company;
• Dahua Technology Company; and
• Subsidiaries or affiliates of the above-mentioned companies.
In implementing the prohibition, the agency administering loan, grant, or subsidy programs shall prioritize available funding and technical support to assist affected businesses, institutions and organizations as is reasonably necessary for those affected entities to transition from covered communications equipment and services, to procure replacement equipment and services, and to ensure that communications service to users Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language
Office Bulletin #25-07 R3
and customers is sustained.
The contractors should furnish telecommunications and video surveillance equipment with a certificate of compliance. The certificate must state telecommunications and video surveillance equipment was not procured or obtained from manufacturers identified in the above list.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -90-
FAITHFUL PERFORMANCE BOND
FAITHFUL PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS, THAT WHEREAS:
The City Council of the City of Calexico, California has awarded to _______________________________________ hereinafter designated as the Principal, the contract for the acquisition, construction and completion of a public improvement more particularly described in said contract, and;
WHEREAS, said Principal is required under the terms of the contract to furnish a bond for the faithful performance of said contract;
NOW, THEREFORE, we the Principal and the surety
company authorized to do a surety business in the State of California as surety, are held and firmly bound unto the City of Calexico hereinafter called the City in the penal sum of _______________________________________ lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors and administrators and successors, jointly and severely, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if the above bounded Principal, its or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the said contract and any alterations made as therein provided, on its or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless, said City, its officers and agents as therein stipulated, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.
IN WITNESS WHEREOF, the said Principal has caused this bond to be executed by its signature attached hereto, and the surety has caused this contract to be executed on this behalf by its duly authorized Attorney in Fact on this day of , 2026.
_____________________________
PRINCIPAL
_____________________________
SURETY
BY ___________________________
ATTORNEY IN FACT
- END OF FAITHFUL PERFORMANCE BOND -
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -91-
LABOR AND MATERIAL BOND
LABOR AND MATERIAL BOND
KNOW ALL MEN BY THESE PRESENTS, THAT WHEREAS:
The City Council of the City of Calexico, California has awarded to _______________________________________ hereinafter designated as the Principal, the contract for the acquisition, construction and completion of a public improvement more particularly described in said contract, and;
WHEREAS, said Principal is required to furnish a bond in connection with said contract providing that if said Principal, or any of its or its subcontractors shall fail to pay for any materials, provisions, provender or other supplies, or equipment used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, the surety of this bond will pay the same to the extent hereinafter set forth;
NOW, THEREFORE, we the Principal and _______________________________________________ _____________________________________________, Surety Company authorized to do business in the State of California, as surety, are held and firmly bound unto the City of Calexico, hereinafter called the City in a penal sum of ___________________________________ _______________________________Dollars ($ . ) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors and administrators, and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, its or its heirs, executors, administrators, successors and assigns shall fail to pay for any materials, provisions, provender or other supplies, or equipment used in, on, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, as required by the provisions of the laws of the State of California, to secure the payment of claims of persons employed by Contractors upon public works, and the claim of persons who furnish material and supplies therefore, then such surety will pay the same in or to an amount not exceeding the amount herein above set forth, and also will pay in case suit is brought upon this bond, a reasonable attorney fee as fixed by court.
IN WITNESS WHEREOF, the Principal has caused this bond to be executed by its signature affixed thereto and the Surety has caused this contract to be executed by its duly authorized Attorney in Fact, on this ______ day of_______________, 2026.
_______________________________
PRINCIPAL
_______________________________
SURETY
BY____________________________
ATTORNEY IN FACT
- END OF LABOR AND MATERIAL BOND -
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -92-
WARRANTY BOND
WARRANTY BOND
WHEREAS the City of Calexico has executed an agreement with ______________________ (hereinafter “Contractor”), requiring Contractor to perform certain work consisting of but not limited to, furnishing all labor, materials, tools, equipment, services, and incidentals for the construction of public improvements (hereinafter “Work”); WHEREAS, the Work to be performed by Contractor is more particularly set forth in that certain Public Works Agreement (Contract No. ______________________) dated ______________________________________ (hereinafter the “Agreement”); and WHEREAS, said Contractor is required under the terms of said Agreement to furnish a bond for the warranty of said improvements.
NOW, THEREFORE, we, the Contractor, and , as
surety, are held and firmly bound unto the City of Calexico in the penal sum of Dollars ($ ) lawful money of the
United States, said sum being not less than 10% of the total amount payable by Contractor under the terms of the Agreement, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors, executors, and administrators, jointly and severally, firmly by these presents.
The condition of this obligation is such that if the above bound Contractor, its or its heirs, executors, administrators, successors, or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions, and provisions in said agreement and any alteration thereof made as therein provided, on its or their part, to be kept and performed thereof made as therein provided, on its or its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless City, its officers, agents, and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby, and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees including reasonable attorneys’ fees, incurred by the City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.
The surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the agreement or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the agreement or to the work or to the specifications.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -93-
WARRANTY BOND
IN WITNESS WHEREOF, we have hereto set our hands and seals this day on ___________________________________2026
Contractor:_
_________________________________
By:_______________________________________
__
Name
Surety:_ ___________________________________
By:
________________________________________
Attorney-in-Fact
- END OF WARRANTY BOND -
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -94-
WORKMEN’S COMPENSATION INSURANCE CERTIFICATE
WORKMEN'S COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by the California Labor Code, Sections 1860 and 1861:
I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for Workmen's Compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the work of this contract.
_____________________________ ____________________________ Date Contractor’s Name
____________________________
Contractor’s Signature
____________________________
Title
ATTEST:
By _____________________________
Signature
_____________________________
Title
- END OF WORKMEN’S COMPENSATION INSURANCE CERTIFICATE -
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -95-
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
The bidder_________________________________________________________________, proposed subcontractor _______________________________________________, hereby certifies that it has_____, has not___, participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, it has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President’s Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.
Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts, which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.)
Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.
Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S.
Department of Labor.
Date:__________________________ _______________________________ Contractor’s Name
_______________________________
Contractor’s Signature
_______________________________
Title
- END OF EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION -
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -96-
DEBARMENT AND SUSPENSION CERTIFICATION
DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, and manager:
• Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any federal agency;
• Has not been suspended, debarred, voluntarily excluded or determined ineligible by any federal agency within the past 3 years;
• Does not have a proposed debarment pending; and
• Has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.
If there are any exceptions to this certification, insert the exceptions in the following space.
Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.
Notes: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.
Date:__________________________ _______________________________ Contractor’s Name
_______________________________
Contractor’s Signature
_______________________________
Title
- END OF DEBARMENT AND SUSPENSION CERTIFICATION -
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -97-
DRUG/ALCHOHOL TESTING REQUIREMENTS
DRUG/ALCOHOL TESTING REQUIREMENTS
The Contractor shall execute the following form as required by the Federal Drug and Alcohol, Section 49 CFR Part 382.
I agree to comply with the provisions of Federal Omnibus Transportation Employee Testing Act of 1991, and that I will administer a program of alcohol and drug testing of all commercial vehicle operators, as required by Federal Regulations.
Contractor certifies compliance with the City of Calexico’s Drug and Alcohol Free Workplace Policy as a condition of the State Drug-Free Workplace Act of 1990 (Government Code Section 8350 et seq.) and the Federal Drug Free Workplace Act of 1988 (41 U.S.C.A. Section 701 et seq.) In addition, Contractor agrees to submit a copy of its own drug free workplace policy.
Dated_____________________________ __________________________________ Contractor’s Name
__________________________________
Contractor’s Signature
__________________________________
Title
- END OF DRUG/ALCOHOL TESTING REQUIREMENTS -
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -98-
CORPORATE CERTIFICATION OR PARTNERSHIP INFORMATION
CORPORATE CERTIFICATION OR PARTNERSHIP INFORMATION
Name of Corporation or Partnership_________________________________________________ State of
Incorporation_____________________________________________________________ List names and addresses of each partner, or titles, names and business addresses of President, Secretary and Treasurer.
______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ _
Date_____________________________
Contractor_____________________
_______
Signature_________________________ Title________________________________ ATTEST:
________________________________________
Signature by
________________________________________
Title
- END OF CORPORATE CERTIFICATION -
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -99-
NOTICE OF AWARD
NOTICE OF AWARD
______________________________________________________________________________ TO: (CONTRACTOR)
FOR CONSTRUCTION OF:
______________________________________________________________________________ Your Bidder's Proposal dated________________________________________________, is accepted for the total contract price of
$__________________________________________________.
You are required by the "INSTRUCTIONS TO BIDDERS" to execute the documents specified within ten (10) days from the date of mailing this Notice. Please sign one copy of the Notice of Award upon receipt and return.
RECEIVED:
CONTRACTOR THE CITY OF CALEXICO
By:________________________________ By:____________________________ _________________________________ _________________________________ (Title) (Title)
_________________________________ _________________________________ (Date) (Date)
- END OF NOTICE TO AWARD -
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -100-
PREVAILING WAGE REFERENCE
CITY OF CALEXICO
BID REQUIREMENTS
WEAKLEY STREET IMPROVEMENT
FEDERAL-AID PROJECT NO. CML-5168(032
PREVAILING WAGE DETERMINATION
-REFERENCE/SAMPLE SHEETS-
"General Decision Number: CA20260002 01/23/2026
Superseded General Decision Number: CA20250002
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
County: Imperial County in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Modification Number Publication Date
0 01/02/2026
1 01/16/2026
2 01/23/2026
ASBE0005-002 09/01/2024
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
protective coverings,
coatings, and finishes to all
types of mechanical systems).....$ 56.32 26.52
Fire Stop Technician
(Application of Firestopping
Materials for wall openings
and penetrations in walls,
floors, ceilings and curtain
walls)...........................$ 39.94 20.65
---------------------------------------------------------------- ASBE0005-004 07/04/2022
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)....$ 23.52 13.37
---------------------------------------------------------------- BRCA0004-002 11/01/2024
Rates Fringes
BRICKLAYER; MARBLE SETTER........$ 58.81 19.14
---------------------------------------------------------------- BRCA0018-004 06/01/2024
Rates Fringes
MARBLE FINISHER..................$ 43.38 15.36
TILE FINISHER....................$ 37.96 13.77
TILE LAYER.......................$ 51.82 19.32
---------------------------------------------------------------- BRCA0018-010 09/01/2024
Rates Fringes
TERRAZZO FINISHER................$ 42.11 14.67
TERRAZZO WORKER/SETTER...........$ 49.62 15.26
---------------------------------------------------------------- CARP0213-001 07/01/2025
Rates Fringes
CARPENTER
(1) Carpenter, Cabinet
Installer, Insulation
Installer, Hardwood Floor
Worker and acoustical
installer...................$ 52.24 26.18
(2) Millwright..............$ 52.24 26.68
(3) Piledrivermen/Derrick
Bargeman, Bridge or Dock
Carpenter, Heavy Framer,
Rock Bargeman or Scowman,
Rockslinger, Shingler
(Commercial)................$ 52.37 26.18
(4) Pneumatic Nailer,
Power Stapler...............$ 52.37 26.18
(5) Sawfiler...............$ 52.34 26.18
(6) Scaffold Builder.......$ 45.37 25.43
(7) Table Power Saw
Operator....................$ 52.34 26.18
FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a
substitute for back forms (which work is performed by
piledrivers): $0.13 per hour additional.
---------------------------------------------------------------- CARP0213-002 07/01/2025
Rates Fringes
Diver
(1) Wet.....................$ 901.92 26.18
(2) Standby.................$ 450.96 26.18
(3) Tender..................$ 442.96 26.18
(4) Assistant Tender........$ 418.96 26.18
Amounts in ""Rates' column are per day
---------------------------------------------------------------- CARP0213-004 07/01/2025
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 52.24 26.18
STOCKER/SCRAPPER............$ 21.45 11.27
---------------------------------------------------------------- CARP0721-001 07/01/2025
Rates Fringes
Modular Furniture Installer......$ 25.00 13.06
---------------------------------------------------------------- ELEC0569-002 08/31/2020
Rates Fringes
Electricians (Electrical
contracts of $500,000 or less)
Cable Splicer...............$ 48.40 3%+14.88
Tunnel Work................$ 54.36 3%+14.88
Electrician.................$ 47.65 3%+14.88
Tunnel Work................$ 53.61 3%+14.88
Electricians: (Electrical
contracts of $500,000 and
over)
Cable Splicer...............$ 51.40 3%+14.88
Tunnel Work................$ 57.36 3%+14.88
Electrician.................$ 50.65 3%+14.88
Tunnel Work................$ 56.61 3%+14.88
---------------------------------------------------------------- ELEC0569-005 06/03/2024
Rates Fringes
Sound & Communications
Sound Technician............$ 43.78 15.39
SCOPE OF WORK Assembly, installation, operation, service and maintenance of components or systems as used in closed circuit television, amplified master television distribution, CATV on private property, intercommunication, burglar alarm, fire alarm, life support and all security alarms, private and public telephone and related telephone interconnect, public address, paging, audio, language, electronic, background music system less than line voltage or any system acceptable for class two wiring for private, commercial, or industrial use furnished by leased wire, freuency modulation or other
recording devices, electrical apparatus by means of which electricity is applied to the amplification, transmission, transference, recording or reproduction of voice, music, sound, impulses and video. Excluded from this Scope of Work - transmission, service and maintenance of background music.
All of the above shall include the installation and
transmission over fiber optics.
SOUND TECHNICIAN: Terminating, operating and performing final check-out
---------------------------------------------------------------- ELEC0569-006 06/02/2025
Work on street lighting; traffic signals; and underground systems and/or established easements outside of buildings Rates Fringes
Traffic signal, street light
and underground work
Utility Technician #1.......$ 43.62 14.41
Utility Technician #2.......$ 33.10 14.09
STREET LIGHT & TRAFFIC SIGNAL WORK:
UTILITY TECHNICIAN #1: Installation of street lights and traffic signals, including electrical circuitry,
programmable controller, pedestal-mounted electrical meter enclosures and laying of pre-assembled cable in ducts. The layout of electrical systems and communication installation including proper position of trench depths, and radius at duct banks, location for manholes, street lights and
traffic signals.
UTILITY TECHNICIAN #2: Distribution of material at jobsite, installation of underground ducts for electrical,
telephone, cable TV land communication systems. The
setting, leveling, grounding and racking of precast
manholes, handholes and transformer pads.
---------------------------------------------------------------- ELEC1245-001 01/01/2025
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 70.16 24.71
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment).............$ 53.30 22.26
(3) Groundman...............$ 40.76 21.76
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
---------------------------------------------------------------- ELEV0018-001 01/01/2025
Rates Fringes
ELEVATOR MECHANIC................$ 69.43 38.435+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
---------------------------------------------------------------- ENGI0012-004 08/01/2025
Rates Fringes
OPERATOR: Power Equipment
(DREDGING)
(1) Leverman................$ 67.90 40.95
(2) Dredge dozer............$ 61.93 40.95
(3) Deckmate................$ 61.82 40.95
(4) Winch operator (stern
winch on dredge)............$ 61.27 40.95
(5) Fireman-Oiler,
Deckhand, Bargeman,
Leveehand...................$ 60.73 40.95
(6) Barge Mate..............$ 61.34 40.95
---------------------------------------------------------------- * ENGI0012-024 07/01/2025
Rates Fringes
OPERATOR: Power Equipment
(All Other Work)
GROUP 1....................$ 63.40 33.20
GROUP 2....................$ 64.18 33.20
GROUP 3....................$ 64.67 33.20
GROUP 4....................$ 65.96 33.20
GROUP 6....................$ 66.18 33.20
GROUP 8....................$ 66.29 33.20
GROUP 10....................$ 66.41 33.20
GROUP 12....................$ 66.58 33.20
GROUP 13....................$ 66.68 33.20
GROUP 14....................$ 66.71 33.20
GROUP 15....................$ 66.79 33.20
GROUP 16....................$ 66.91 33.20
GROUP 17....................$ 67.08 33.20
GROUP 18....................$ 67.18 33.20
GROUP 19....................$ 67.29 33.20
GROUP 20....................$ 67.41 33.20
GROUP 21....................$ 67.58 33.20
GROUP 22....................$ 67.68 33.20
GROUP 23....................$ 67.79 33.20
GROUP 24....................$ 67.91 33.20
GROUP 25....................$ 68.08 33.20
OPERATOR: Power Equipment
(Cranes, Piledriving &
Hoisting)
GROUP 1....................$ 64.75 33.20
GROUP 2....................$ 65.53 33.20
GROUP 3....................$ 65.82 33.20
GROUP 4....................$ 65.96 33.20
GROUP 5....................$ 66.18 33.20
GROUP 6....................$ 66.29 33.20
GROUP 7....................$ 66.41 33.20
GROUP 8....................$ 66.58 33.20
GROUP 9....................$ 66.75 33.20
GROUP 10....................$ 67.75 33.20
GROUP 11....................$ 68.75 33.20
GROUP 12....................$ 69.75 33.20
GROUP 13....................$ 70.75 33.20
OPERATOR: Power Equipment
(Tunnel Work)
GROUP 1....................$ 65.25 33.20
GROUP 2....................$ 66.03 33.20
GROUP 3....................$ 66.32 33.20
GROUP 4....................$ 66.46 33.20
GROUP 5....................$ 66.68 33.20
GROUP 6....................$ 66.79 33.20
GROUP 7....................$ 66.91 33.20
PREMIUM PAY:
$10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval
Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp
Pendleton
Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator.
SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator
operator-inside; Engineer Oiler; Forklift operator
(includes loed, lull or similar types under 5 tons;
Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank
operator);Coil Tubing Rig Operator, Concrete mixer
operator-skip type; Conveyor operator; Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or
concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd. without
attachment); Tar pot fireman; Temporary heating plant
operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable);Direct Push
Operator (Geoprobe or similar types) Drilling machine
operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types -
drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling
(above ground tunnel); Power concrete curing machine
operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck
GROUP 6: Articulating material hauler; Asphalt plant
engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator,
bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45'
maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track
maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete,
Clary-Johnson-Bidwell or similar); Micro tunnel system
(below ground); Pavement breaker operator (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator
(crawler and wheel type, over 3/4 yd. and up to and
including 1-1/2 yds.); Slip form pump operator (power
driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and
including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator; Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar types; Cable Bundling Machine Operator
(excluding handheld); Cable Trenching Machine Operator
(Spider Plow or similar types) Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled);
Concrete mixer operator (paving); Crushing plant operator; Drill Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types - drilling depth of 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar
type); Pumpcrete gun operator; RCM Cementing Unit Operator, Rail/Switch Grinder Operator (Harsco or similar types)
Rock Drill or similar types; Rotary drill operator
(excluding caisson type); Rubber-tired earth-moving
equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck);
Rubber-tired earth-moving equipment operator (multiple
engine up to and including 25 yds. struck); Rubber-tired scraper operator (self-loading paddle wheel type-John
Deere, 1040 and similar single unit); Self- propelled curb and gutter machine operator; Shuttle buggy; Skiploader
operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type
larger than D-5 - 100 flywheel h.p. and over, or
similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator;
Trenching machine operator (over 6 ft. depth capacity,
manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull
(compaction) operator
GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar
types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail
locomotive operator (diesel, gas or electric); Motor
patrol-blade operator (single engine); Multiple engine
tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber-tired earth-moving equipment operator (single
engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment)
GROUP 12: Auto grader operator; Automatic slip form operator; Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or
similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu. yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine); Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units)
GROUP 13: Rubber-tired earth-moving equipment operator
operating equipment with push-pull system (single engine, up to and including 25 yds. struck)
GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.)
GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple
engine-up to and including 25 yds. struck)
GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system
(multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type)
GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, up to and including 25 yds. struck)
GROUP 19: Rotex concrete belt operator (or similar types); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any
combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment
operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction
units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating in tandem
(scrapers, belly dumps, and similar types in any
combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)
GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, up to and including 25 yds. struck)
GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, Caterpillar, Euclid, Athey Wagon and
similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck)
GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar type, over 50 cu. yds. struck); Spyder Excavator Operator, with all attachments
CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types)
GROUP 2: Truck crane oiler
GROUP 3: A-frame or winch truck operator; Ross carrier
operator (jobsite)
GROUP 4: Bridge-type unloader and turntable operator;
Helicopter hoist operator
GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum)
GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile
operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar
gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane
repair; Tugger hoist operator (3 drum)
GROUP 8: Crane operator (up to and including 25 ton
capacity); Crawler transporter operator; Derrick barge
operator (up to and including 25 ton capacity); Hoist
operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.)
GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons
GROUP 10: Crane operator (over 50 tons and up to and
including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.);
GROUP 11: Crane operator (over 100 tons and up to and
including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) ; Tower crane operator and tower gantry
GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and
including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)
GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons)
TUNNEL CLASSIFICATIONS
GROUP 1: Skiploader (wheel type up to 3/4 yd. without
attachment)
GROUP 2: Power-driven jumbo form setter operator
GROUP 3: Dinkey locomotive or motorperson (up to and
including 10 tons)
GROUP 4: Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons)
GROUP 5: Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading
shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons)
GROUP 6: Heavy Duty Repairman
GROUP 7: Tunnel mole boring machine operator
ENGINEERS ZONES
$1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below:
That area within the following Boundary: Begin in San
Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 6, T25S, R42E, MDM. Continue W along the Inyo and San
Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM.
Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM.
Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM.
Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM.
Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM
$1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below:
That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17E, MDM. Continue E to SW corner of T31S, R18E, MDM.
Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM.
Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W.
Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM.
$2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below:
That area within the following Boundary: Begin at the
intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM.
Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM.
Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM. Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM.
Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM.
REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE
---------------------------------------------------------------- IRON0229-001 01/01/2025
Rates Fringes
IRONWORKER
Fence Erector...............$ 45.78 26.51
Ornamental, Reinforcing
and Structural..............$ 50.70 35.15
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0300-005 07/01/2025
Rates Fringes
Asbestos Removal Laborer.........$ 46.48 25.93
SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos-containing material and toxic waste, encapsulation, enclosure and
disposal of asbestos- containing materials and toxic waste by hand or with equipment or machinery; scaffolding,
fabrication of temporary wooden barriers and assembly of decontamination stations.
---------------------------------------------------------------- LABO0345-001 07/01/2025
Rates Fringes
LABORER (GUNITE)
GROUP 1.....................$ 55.88 23.77
GROUP 2.....................$ 54.93 23.77
GROUP 3.....................$ 51.39 23.77
FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a
Bosn'n's Chair or suspended from a rope or cable shall
receive 40 cents per hour above the foregoing applicable classification rates. Workers doing gunite and/or
shotcrete work in a tunnel shall receive 35 cents per hour above the foregoing applicable classification rates, paid on a portal-to-portal basis. Any work performed on, in or above any smoke stack, silo, storage elevator or similar type of structure, when such structure is in excess of
75'-0"" above base level and which work must be performed in whole or in part more than 75'-0"" above base level, that work performed above the 75'-0"" level shall be compensated for at 35 cents per hour above the applicable
classification wage rate.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Rodmen, Nozzlemen
GROUP 2: Gunmen
GROUP 3: Reboundmen
---------------------------------------------------------------- LABO1184-001 07/01/2025
Rates Fringes
Laborers: (HORIZONTAL
DIRECTIONAL DRILLING)
(1) Drilling Crew Laborer...$ 47.94 20.86
(2) Vehicle Operator/Hauler.$ 48.11 20.86
(3) Horizontal Directional
Drill Operator..............$ 49.96 20.86
(4) Electronic Tracking
Locator.....................$ 51.96 20.86
Laborers: (STRIPING/SLURRY
SEAL)
GROUP 1.....................$ 49.30 23.97
GROUP 2.....................$ 50.60 23.97
GROUP 3.....................$ 52.61 23.97
GROUP 4.....................$ 54.35 23.97
LABORERS - STRIPING CLASSIFICATIONS
GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery and equipment; equipment repair technician
GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and
preparation of surface for coatings. Traffic control
person: controlling and directing traffic through both
conventional and moving lane closures; operation of all related machinery and equipment
GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This
category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the
application process. Traffic protective delineating system installer: removes, relocates, installs, permanently
affixed roadside and parking delineation barricades,
fencing, cable anchor, guard rail, reference signs,
monument markers; operation of all related machinery and equipment; power broom sweeper
GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all
related machinery and equipment
---------------------------------------------------------------- LABO1184-002 07/01/2025
Rates Fringes
LABORER (TUNNEL)
GROUP 1.....................$ 53.60 25.74
GROUP 2.....................$ 53.92 25.74
GROUP 3.....................$ 54.38 25.74
GROUP 4.....................$ 55.07 25.74
LABORER
GROUP 1.....................$ 46.48 25.95
GROUP 2.....................$ 47.03 25.95
GROUP 3.....................$ 47.58 25.95
GROUP 4.....................$ 49.13 25.95
GROUP 5.....................$ 49.48 25.95
LABORER CLASSIFICATIONS
GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike-off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or
water pipeline laborer; Laborer, asphalt-rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator
(walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete; Railroad maintenance, repair track person and road beds; Streetcar and railroad construction track laborers; Rigging and signaling; Scaler; Slip form raiser; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations
GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and
installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curbs, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water
pipeline wrapper - pot tender and form person; Guinea
chaser; Headerboard person - asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer(lead); Tank scaler and cleaner; Tree climber, faller, chain saw
operator, Pittsburgh chipper and similar type brush
shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi-plate; Kettle person, pot person and workers applying asphalt, lay-kold,
creosote, lime caustic and similar type materials
(""applying"" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating
machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, Wacker and similar type; Trenching machine, hand-propelled
GROUP 4: Asphalt raker, lute person, ironer, asphalt dump person, and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand-guided lagging hammer; Head rock
slinger; Laborer, asphalt- rubber distributor boot person; Laser beam in connection with laborers' work; Oversize
concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No-joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster
(nozzle person), water blasting, Porta Shot-Blast
GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power; Toxic waste removal
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Batch plant laborer; Changehouse person; Dump
person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials handling person; Nipper; Pot tender, using mastic or other materials (for example, but not by way of limitation, shotcrete, etc.) GROUP 2: Chucktender, cabletender; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic
tools (except driller); Bull gang mucker, track person; Concrete crew, including rodder and spreader
GROUP 3: Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; Jumbo person; Kemper and other pneumatic concrete placer operator; Miner, tunnel (hand or machine); Nozzle person; Operating of
troweling and/or grouting machines; Powder person (primer house); Primer person; Sandblaster; Shotcrete person; Steel form raiser and setter; Timber person, retimber person, wood or steel; Tunnel Concrete finisher
GROUP 4: Diamond driller; Sandblaster; Shaft and raise work ---------------------------------------------------------------- LABO1184-004 11/01/2025
Rates Fringes
Brick Tender.....................$ 42.60 22.13
---------------------------------------------------------------- LABO1414-003 08/06/2025
Rates Fringes
LABORER
PLASTER CLEAN-UP LABORER....$ 46.17 25.97
PLASTER TENDER..............$ 48.72 25.97
Work on a swing stage scaffold: $1.00 per hour additional.
Work at Military Bases - $3.00 additional per hour:
Coronado Naval Amphibious Base, Fort Irwin, Marine Corps Air Station-29 Palms, Imperial Beach Naval Air Station, Marine Corps Logistics Supply Base, Marine Corps Pickle Meadows, Mountain Warfare Training Center, Naval Air
Facility-Seeley, North Island Naval Air Station, Vandenberg AFB.
---------------------------------------------------------------- PAIN0036-001 07/01/2023
Rates Fringes
Painters: (Including Lead
Abatement)
(1) Repaint (excludes San
Diego County)...............$ 29.59 17.12
(2) All Other Work..........$ 38.52 18.64
REPAINT of any previously painted structure. Exceptions:
work involving the aerospace industry, breweries,
commercial recreational facilities, hotels which operate commercial establishments as part of hotel service, and sports facilities.
---------------------------------------------------------------- PAIN0036-008 09/01/2024
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 49.33 26.82
---------------------------------------------------------------- PAIN0036-013 10/01/2024
Rates Fringes
GLAZIER..........................$ 52.90 22.16
---------------------------------------------------------------- PAIN0036-019 01/01/2025
Rates Fringes
SOFT FLOOR LAYER.................$ 40.77 19.37
---------------------------------------------------------------- PLAS0200-004 08/03/2022
Rates Fringes
PLASTERER........................$ 47.37 19.64
Work at Naval Air Facility Seeley: $3.00 additional per hour ---------------------------------------------------------------- PLAS0500-002 07/01/2025
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 47.70 27.07
---------------------------------------------------------------- PLUM0016-008 09/01/2025
Rates Fringes
PLUMBER/PIPEFITTER
Seeley Naval Air Station....$ 72.23 26.81
Work ONLY on new additions
and remodeling of bars,
restaurants, stores and
commercial buildings, not
to exceed 5,000 sq. ft. of
floor space.................$ 59.85 25.83
Work ONLY on strip malls,
light commercial, tenant
improvement and remodel
work........................$ 44.29 24.16
All other work except work
on new additions and
remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space and work on
strip malls, light
commercial, tenant
improvement and remodel
work........................$ 61.73 26.81
---------------------------------------------------------------- PLUM0345-001 09/01/2025
Rates Fringes
PLUMBER
Landscape/Irrigation Fitter.$ 44.75 26.20
Sewer & Storm Drain Work....$ 48.84 23.58
---------------------------------------------------------------- ROOF0045-001 07/01/2024
Rates Fringes
ROOFER...........................$ 42.80 12.64
---------------------------------------------------------------- SFCA0669-002 01/01/2026
Rates Fringes
SPRINKLER FITTER.................$ 50.79 29.80
---------------------------------------------------------------- SHEE0206-002 01/01/2025
Rates Fringes
Sheet Metal (TECHNICIAN).........$ 38.65 10.31
SHEET METAL WORKER...............$ 51.45 30.92
SHEET METAL TECHNICIAN - SCOPE:
LIGHT COMMERCIAL WORK: Any sheet metal, heating and air conditioning work performed on a project where the total construction cost, excluding land, is under $1,000,000.
TENANT IMPROVEMENT WORK: Any work necessary to finish
interior spaces to conform to the occupants of commercial buildings, after completion of the building shell
---------------------------------------------------------------- TEAM0011-002 07/01/2025
Rates Fringes
TRUCK DRIVER
GROUP 1....................$ 41.59 35.69
GROUP 2....................$ 41.74 35.69
GROUP 3....................$ 41.87 35.69
GROUP 4....................$ 42.06 35.69
GROUP 5....................$ 42.09 35.69
GROUP 6....................$ 42.12 35.69
GROUP 7....................$ 42.37 35.69
GROUP 8....................$ 42.62 35.69
GROUP 9....................$ 42.82 35.69
GROUP 10....................$ 43.12 35.69
GROUP 11....................$ 43.62 35.69
GROUP 12....................$ 44.05 35.69
WORK ON ALL MILITARY BASES:
PREMIUM PAY: $3.00 per hour additional.
[29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB, El Centro Naval Facility, Fort Irwin, Marine Corps
Logistics Base at Nebo & Yermo, Mountain Warfare Training Center, Bridgeport, Point Arguello, Point Conception,
Vandenberg AFB]
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Truck driver
GROUP 2: Driver of vehicle or combination of vehicles - 2 axles; Traffic control pilot car excluding moving heavy equipment permit load; Truck mounted broom
GROUP 3: Driver of vehicle or combination of vehicles - 3 axles; Boot person; Cement mason distribution truck; Fuel truck driver; Water truck - 2 axle; Dump truck, less than 16 yds. water level; Erosion control driver
GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete truck, less than 6-1/2 yds. water level
GROUP 5: Water truck, 3 or more axles; Truck greaser and tire person ($0.50 additional for tire person); Pipeline and utility working truck driver, including winch truck and plastic fusion, limited to pipeline and utility work;
Slurry truck driver
GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck, 6-1/2 yds. water level and over; Vehicle or combination of vehicles - 4 or more axles; Oil spreader truck; Dump truck, 16 yds. to 25 yds. water level
GROUP 7: A Frame, Swedish crane or similar; Forklift driver; Ross carrier driver
GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck repair person; Water pull - single engine; Welder
GROUP 9: Truck repair person/welder; Low bed driver, 9 axles or over
GROUP 10: Dump truck - 50 yds. or more water level; Water pull - single engine with attachment
GROUP 11: Water pull - twin engine; Water pull - twin engine with attachments; Winch truck driver - $1.25 additional when operating winch or similar special attachments
GROUP 12: Boom Truck 17K and above
---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at
https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the
contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage
determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at
www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
---------------------------------------------------------------- The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates
in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the
collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this
classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union
prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier. ?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
-----------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on
a wage determination matter
d) an initial conformance (additional classification
and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to [email protected] or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as
conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to [email protected] or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to [email protected] or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210.
================================================================ END OF GENERAL DECISION"
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -104-
SPECIFICATIONS
CITY OF CALEXICO
SPECIFICATIONS
WEAKLEY STREET IMPROVEMENT
FEDERAL-AID PROJECT NO. CML-5168(032)
PART 1 - GENERAL PROVISIONS
(AMENDMENTS TO THE SSPWC/GREENBOOK)
PART 2 - TECHNICAL SPECIFICATIONS
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -105-
SPECIFICATIONS
PART 1 – GENERAL PROVISIONS
All WORK embraced herein shall be performed in accordance with the Standard Specifications for Public Works (SSPWC or “Greenbook”), latest edition, including all supplements, as written and promulgated by Public Works Standards, Inc. Copies of the GREENBOOK are available from the publisher:
Building News, Incorporated
990 Park Center Dr., Ste. E
Vista, CA 92081
Tel: (760) 734-1113
www.bnibooks.com
The following General Provisions supplement and amend the SSPWC. In case of conflict between the Standard Specifications (Greenbook 2024 Edition) or the City Standard Plans, these Special Provisions shall take precedence over, and be used in lieu of such conflicting portions.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -106-
SPECIFICATIONS
SECTION 1 - GENERAL
1-6 BIDDING AND SUBMISSION OF THE BID.
1-6.1 General.
Add the following Subsections:
1-6.1.1 Instruction to Bidders
(a) Site Examination: The Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work, the general and local conditions, such as, but not limited to, all other matters which could in any way impact the Work or the costs thereof. The failure of the Contractor to acquaint itself with all available information regarding any applicable existing or future conditions shall not relieve it from the responsibility for properly estimating the difficulties, responsibilities, or costs of successfully performing the Contract Work according to the Contract Documents. (b) Flow and Acceptance of Water: Storm, surface, nuisance or other waters may be encountered at various times during construction of the Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that he has investigated the risk arising from such waters, has prepared the Bid response accordingly, and assumes any and all risks and liabilities from such flows of water.
SECTION 2 – SCOPE OF WORK
2-1 WORK TO BE DONE.
Insert at the end of the first (1st) paragraph:
In accordance with the contract, and leaving the construction site in a neat, clean, and orderly condition upon completion of the Work.
The estimated quantities of work and materials to be performed, constructed or furnished by the Contractor under this Contract are as shown on the Schedule of Prices in the Bid Proposal. The costs for items not specifically listed on the Schedule of Prices, but necessary to complete the Work are considered to be included in the unit cost of items listed in the Schedule of Prices.
Any plan or method suggested to the Contractor by the City Engineer or inspector but not specified or required, if adopted or followed in whole or in part, shall be used at the risk and responsibility of the Contractor; and the City and the City Engineer will assume no responsibility therefore.
2-2 PERMITS AND LICENSE.
Modify as follows:
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -107-
SPECIFICATIONS
2-2.1 Business License. Contractor to obtain a City Business License as a conditional precedent to being engaged as a contractor or subcontractor within the City. 2-2.2 Waiver of Fees. The City shall waive fees for City-issued permits, to the Contractor for use in obtaining the required City permits with the Notice of Award documents.
Fees required and paid for the Project by other agencies will be reimbursable by the City for the exact amount (no markup) shown on the receipt.
2-2.3 Right-of-Way Permits. The Contractor shall be required to obtain a no fee Right-of-Way Encroachment prior to starting work. The Contractor shall comply with all provisions of all permits.
2-2.4 Construction Water Meter. The Contractor may obtain a City construction water meter which is required for any water taken from City hydrants or other facilities for water used for construction purposes. A refundable deposit is required for the meter. The Contractor shall furnish all water necessary for completion of the work. If City water is not available, it is the Contractor’s responsibility to obtain water from other agencies and comply with their requirements. No additional compensation will be provided. 2-3 RIGHT-OF-WAY
Insert after first (1st) Paragraph:
Except as may specifically be provided to the contrary, nothing herein shall be construed to entitle the Contractor to the exclusive use of any public street or way during performance of the contract work, and he shall so conduct his operations as not to interfere unnecessarily with the authorized work of utility companies or other agencies in such streets and ways. 2-4 COOPERATION AND COLLATERAL WORK.
Insert at end of first (1st) Paragraph:
Should construction be under way or subsequently begun by other forces or by other contractors within or adjacent to the limits of the Work, or in the vicinity of the Work to be done under this contract, the Contractor shall so conduct the Contractor’s operations as to interfere to the least possible extent with the Work of such other forces or contractors. If the performance of this contract is likely to be interfered with by the simultaneous performance of some other forces or contractors, the Engineer shall decide which contractor shall continue or if the Work be proceed concurrently.
Add as last Paragraph:
Any difference or conflicts that may arise between the Contractor and subcontractors or contractors of adjacent projects because of delays or hindrance to each other, shall be adjusted
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -108-
SPECIFICATIONS
and determined by the Engineer. If the Work of the Contractor is delayed because of any acts or omissions of any other contractor or force, the Contractor shall on that account have no claim for additional compensation or extra cost against the City. 2-5.2.1 Sanitation
Add the following Subsection:
The necessary sanitary conveniences for the use of the employees engaged in the project, properly obscured from public observance, shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the Engineer and their use shall be strictly enforced. The accommodations shall be maintained in a neat and sanitary condition and regularly pumped out.
2-5.5 Temporary Facilities and Services.
Add the following Subsection:
The Contractor shall be responsible for providing and maintaining temporary fences, safety barricades, watchman, etc., at the Contractor’s expense. 2-8 EXTRA WORK
Add the following at the end of the first paragraph:
Extra Work is also defined as additional work required by changes in the details of work described in the Specifications.
Any extra work performed by the Contractor without an approved Contract Change Order from the City Engineer shall be at the Contractor's risk
SECTION 3 – CONTROL OF THE WORK
3-5 INSPECTION
Delete the first (1st) and second (2nd) sentences and replace with the following:
The Work is subject to inspection and approval by the Engineer or the Public Works Inspector.
The Contractor shall notify the Inspector at least 48 hours in advance of when inspection is required, exclusive of weekends and holidays. The appointed Public Works Inspector and contact number will be provided on the second (2nd) page of the permit when issued.
Insert at end of Paragraph:
Defective work shall be made good, and unsuitable materials may be rejected notwithstanding the fact that such defective work and unsuitable materials may have been previously overlooked by the Engineer and accepted.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -109-
SPECIFICATIONS
3-5.2 Final Inspection.
The Engineer will not make the Final Inspection until all Contract Work has been provided per the Contract Documents and the punch-list has been completed and corrections verified.
Following the final clean up and when the Contractor believes the Work has been completed the Contractor shall notify the Engineer to perform the Final Inspection. The Contractor may be present at the final inspection. The Contractor will be notified in writing of any outstanding defects or deficiencies to be remedied. When notified that corrective work is completed, the Engineer will again inspect the Work and when the Engineer is satisfied all Contract Work has been provided and completed in accordance with the plans and specifications, the Engineer will recommend to the Council that the Work be formally accepted. 3-6 THE CONTRACTOR’S REPRESENTATIVE.
Add the following after the first (1st) Paragraph:
The superintendent and any representatives, within reason, shall be satisfactory to the Engineer.
All directions of the Engineer shall be given in writing and shall be received and obeyed by the superintendent in charge of the particular work, reference to which orders are given; and all such directions given to the superintendent shall be as binding as if given to the Contractor in person. 3-6.1 Emergency Information
Insert the following subsection:
The names, addresses, and telephone numbers of the Contractor and subcontractors, or their representatives, shall be filed with the Engineer and the County Sheriff's Department prior to beginning work.
3-7 CONTRACT DOCUMENTS
3-7.1 General
Replace the first sentence with the following:
The Contractor shall keep one copy of all drawings and specifications for the Work on the work site in good order, accessible to the Engineer and the Engineer’s representatives at all times.
Insert as first (1st) sentence of the second (2nd) paragraph:
It is the intent of these specifications and any related contract drawings that work performed under the contract shall result in a complete and fully operating system in satisfactory working condition with respect to the functional purpose of the installations.
Substitute the last paragraph with the following:
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -110-
SPECIFICATIONS
If the Contractor, either commencing work or in the course of the Work, finds any discrepancy between the Specifications and the Plans, or between either and the physical conditions at the site of the Work, or finds any error or omission in any of the plans, or in any survey, he shall promptly notify the Engineer in writing of any such discrepancy, error, or omission. If the Contractor observes that any plans or specifications are at variance with any applicable law, ordinance, regulation, order or decree, he shall promptly notify the Engineer in writing of such conflict.
The Engineer upon receipt of any such notice shall promptly investigate the circumstances and give appropriate instructions to the Contractor. Until such instructions are given, any work done by the Contractor, either directly or indirectly, after the discovery of such error, discrepancy, or conflict, shall be at the Contractor’s own risk, and he shall bear all costs arising therefrom.
Should it appear that the Work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained on the Contract Documents, or in the event of any doubt or question arising respecting the true meaning of the Specifications, the Contractor shall consult the Project Manager for such further explanation as may be necessary and the Project Manager's decision shall be final and binding.
3-7.2 Precedence of the Contract Documents.
This section is replaced in its entirety with the following:
If there is a conflict between Contract Documents, the highest in precedence shall control. The order of precedence shall be as follows:
a) Permits from other agencies as may be required by law. b) Change Orders and Supplemental Agreements; whichever occurs last. c) Contract/Agreement between City and Contractor
d) Addenda
e) Notice Inviting Bids
f) Bid Schedule
g) Project Special Provisions and Technical Specifications h) Project Plans, detailed plans shall have precedence over general plans i) City Standard Specifications and Plans
j) Reference Specifications and Plans (including but not limited to Standard Specifications for Public Works Construction (Greenbook 2024 Edition) and the Standard Plans for Public Works Construction (2021 Edition). Caltrans Standard Plans and Specifications latest revision. WATCH manual, latest revision.
In case of conflict between the Standard Specifications and these Special Provisions, the Special Provisions shall take precedence over, and be used in lieu of such conflicting portions of the Standard Specifications (with the exception of the Caltrans Standard Plans and Specifications for Traffic Signal requirements, these shall take precedence over the Special Provisions and the Standard Specification, City Standard Specifications and Plans).
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -111-
SPECIFICATIONS
3-8 SUBMITTALS.
3-8.1 General.
The following is added in its entirety after the first paragraph:
Promptly after the Notice to Proceed has been received by the Contractor, the Contractor shall provide to the Project Manager a complete list of names and addresses of all suppliers of materials to be used for the Contract.
The Contractor shall submit all submittals required for the Work to the Engineer for review prior to or at the preconstruction meeting which will be held following the Notice of Award and prior to the Notice to Proceed.
The Contractor is ultimately responsible for the accuracy and completeness of the information contained in the submittals. All Contractor submittals shall be reviewed by an authorized representative of the Contractor, prior to submission to the Engineer for review. The Contractor shall review the submittal for correct and strict conformance with the Specifications and Contract Drawings. No consideration for review by the Engineer of any Contractor submittals will be made for any items which have not been certified by the Contractor. All non-certified submittals will be returned to the Contractor without action taken by the Engineer, and any delays caused thereby shall be the total responsibility of the Contractor.
The Engineer’s review of the Contractor’s submittals shall not relieve the Contractor of the entire responsibility for the correctness of details and dimensions. The Contractor shall assume all responsibility and risk for any misfits due to errors in the Contractor submitted submittals. Any fabrication or other Work performed in advance of the receipt of Approved submittals shall be entirely at the Contractor’s risk and expense. The Contractor shall be responsible for the dimensions and the design of adequate connections and details.
Revisions indicated on submittals shall be considered as changes necessary to meet the requirements of the contract drawings and specifications and shall not be taken as the basis of claims for Extra Work.
3-8.1.1 Submittal Transmittal. Accompany each submittal with a Submittal Transmittal Cover Sheet (one cover sheet per submittal category) form. The submittal category may contain one single product, or more than one product. Submittal cover sheets shall contain the following information:
1. Contractor’s name, address, telephone number, the name of the Subcontractor or supplier who prepared the submittal.
2. The Project Name and Project Number.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -112-
SPECIFICATIONS
3. Description of the submittal with reference to the Contract requirement or specification section and paragraph number being addressed.
4. The General Contractor certification stamp shall be affixed to all submittals and shall contain the information as follows:
“SAMPLE SUBMITTAL STAMP”
GENERAL CONSTRUCTION CO. – SUBMITTAL REVIEW
THIS SUBMITTAL HAS BEEN REVIEWED BY THE CONTRACTOR
FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS AND
COORDINATION OF THE WORK.
PROJECT NUMBER: XX – XXX
PROJECT NAME: XXXXXX XXXXXX XXXXX
BY: JOE CONTRACTOR, PROJECT ENGINEER
SIGNATURE: DATE: XX/XX/XXXX
SUBMITTAL NO: XX.YY.NNN-N.N.N
COMMENTS:
5. All submittals (with the exception of the Traffic Control Plan, Schedule and SWPPP Plan) shall be presented for review at the preconstruction meeting.
6. Submittals shall be assigned a sequential number and numbered in the following format:
XX.YY.NNN-N.N.N
XX = the sequential submittal number
YY = the sequential number of the submittal (01 for the first submittal review, 02 for the second submittal review, etc)
NNN-N.N.N = Identifies the specification section number for the required submittal
7. All pages are to be numbered in the following format: Page xx of zz. 3-8.1.2 Electronic Submittals. Electronic submittals are preferred, shall be in PDF form with the required transmittal included. The Contractor shall provide four (4) hard copies to the Engineer at the Preconstruction Meeting, and submit electronically.
Following the Engineer’s review and approval: one (1) copy will be retained by the City and three (3) copies will be returned to the General Contractor; one (1) copy shall remain at the active construction site for use by the Engineer or the Inspector, one (1) shall become a record copy for the Contractor and one (1) shall be supplied to the subcontractor or material supplier or material manufacturer.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -113-
SPECIFICATIONS
3-8.1.3 Hard Copy Submittals. Submittals submitted as hard copies, provide four (4) hard copies for review:
Following the Engineer’s review and approval: one (1) copy will be retained by the City and three (3) copies will be returned to the General Contractor; one (1) copy shall remain at the active construction site for use by the Engineer or the Inspector, one (1) shall become a record copy for the Contractor and one (1) shall be supplied to the subcontractor or material supplier or material manufacturer.
3-8.1.4 Submittal Samples.
a) Unless otherwise specified, whenever the specifications call for actual material samples to be submitted, the Contractor shall submit not less than 3 samples of each item or material to the Engineer for approval at no additional cost to the City. b) Samples shall be submitted for approval with the submittal package at the Preconstruction Meeting. The Samples shall be submitted with enough time allotted for review so that the Work dependent on the materials or equipment can be assembled and reviewed without causing delays in the Work.
c) All samples shall be individually and indelibly labeled or tagged, indicating all specified physical characteristics and manufacturer’s names for identification and submittal to the Engineer for approval. Upon receiving the approval of the Engineer the Contractor will receive two (2) samples, one (1) for the jobsite which will remain at the site until the completion of the work; and (1) for the Contractor’s office use. d) Colored concrete samples shall be 3” x 3” square and approximately 1” thick. 3-8.1.5 Review Comments and Contractor Resubmittal Requirements. a) No Exceptions Taken: formal revision and resubmission of said submittal will not be required.
b) Make Corrections Noted: formal revision and resubmission of said submittal will not be required.
c) Submit Specified Item: the Contractor shall revise said submittal with the specified item and submit to Engineer for review.
d) Revise and Resubmit: the Contractor shall revise said submittal and submit to Engineer for review.
e) Information Only:
f) Rejected: the Contractor shall revise said submittal and submit to Engineer for review.
The following is added after the last paragraph:
All material submittals and construction schedule submittals shall be submitted and approved by the Engineer prior to the commencement of the Work, unless otherwise approved by the City.
Refer to Section 6-1, “Construction Schedule and Commencement of the Work,” for specific
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -114-
SPECIFICATIONS
requirements relating to the construction schedule. No work shall begin until the construction schedule has been approved by the Project Manager.
No work shall begin on the respective items of work that require a submittal until the submittals for those items of work have been approved in writing by the City. 3-8.7 Record Drawing (As-Builts)
Add the following subsection:
The Contractor shall maintain, on the job site, a set of full-size reproducible contract drawings.
On these he shall mark in red all as-built conditions, locations, configurations, and other details, which may vary from the details represented on the original drawings. This master record of as built conditions, including all revisions made necessary by addenda, change orders, and the like, shall be maintained and are up to-date during the progression of work.
Upon completion of the Work and prior to final acceptance, the complete set of redline drawings, marked up to show as-built conditions, shall be delivered to the City. These drawings shall be known as "Record Drawings." If the complete set of redline drawings is not organized or legible, the Contractor shall transfer the redline drawings onto a clean set of drawings to allow the Engineer to record the as-built changes for the City in electronic (CAD) format.
Full compensation for conforming to the requirements of Section 3-8.4.1 shall be considered as included in the various items of work involved and no additional compensation shall be allowed therefore
3-12 WORK SITE MAINTENANCE.
3-12.1 General.
Substitute the second, third and fourth paragraphs with the following:
3-12.1.1 Cleanup and Dust Control
Contractor and all subcontractors are required to clean up the project site on a daily basis. This cleanup shall include, but not be limited to, street sweeping by a mechanical sweeper and/or by hand (depending on the size of the daily job or cleanup), removal of all construction material that is no longer needed on the job site, daily removal of all construction rubbish or /trash away from the job site and proper storage of all construction equipment including traffic control devices that are not in use. Failure to comply with these daily cleanup requirements may result in the City performing the cleanup work and deducting the cost from the Contractor’s payment(s).
Upon completion and before making application for Acceptance of the Work, the Contractor shall clean all Project areas occupied during construction of the Work and the Project site. The Contractor shall remove all rubbish, excess construction materials, temporary structures, and equipment. All parts of the Work area shall be left in a neat and presentable condition.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -115-
SPECIFICATIONS
The Contractor shall remove and dispose of all structures, debris, or other obstructions to the construction of the Work as specified. Where such obstructions consist of improvements not required by law to be removed by the owner thereof, all such improvements shall be removed, maintained, and permanently replaced by the Contractor at the Contractor’s expense as required for performance of the Work.
3-12.4.2 Storage in Public Streets.
Delete Section and Insert:
Stockpiling and/or storage of materials or equipment on any public right-of-way or parking areas will not be allowed without specific permission of the Engineer. Materials spilled along or on said right-of-way or parking area shall be removed completely and promptly. All stockpile and/or storage areas shall be kept in a safe, neat, clean and orderly fashion, and shall be restored to equal or better than original condition upon completion of the Work, or as directed by the Engineer.
No material or equipment shall be stored where it will interfere with the safe passage of public traffic, at the end of each day’s work, and at any other time when construction operations are suspended for any reason, the Contractor shall remove all equipment and other obstructions from that portion of the roadway open for use by the public traffic. 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY.
3-13.1 Completion.
Replace the last sentence in the paragraph with the following:
This will be the date when the Contractor is relieved from responsibility to protect and maintain the Work and to which liquidated damages will be computed, unless specified otherwise by a:
Maintenance Agreement, Development Agreement, Subdivision Agreement, Public Improvement Agreement, Project Conditions of Approval or any other document specifying such. 3-13.2 Acceptance.
Add the following to the end of the Section:
For the purpose of this article, "formal acceptance of the Work by the Council" shall mean the acceptance of the Work by the City, but not for the purpose of extinguishing any covenant or agreement on the part of the Contractor to be performed or fulfilled under this contract which has not, in fact, been performed or fulfilled at the time of such acceptance all of which covenants and agreements shall continue to be binding on the Contractor until they have been fulfilled. 3-13.3 Warranty
Replace the second (2nd) sentence of first (1st) paragraph with:
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -116-
SPECIFICATIONS
The Contractor shall warrant and guarantee the entire Project for a period of one year commencing on the date of formal acceptance of the Work by the Council.
Insert at the end of the second (2nd) paragraph:
Deliver to the Engineer by the Contractor prior to final acceptance of the Work.
Replace last paragraph with:
The Contractor shall, upon the receipt of written notice from the City, promptly make all repairs arising out of defective materials, workmanship or equipment, including repair of settled backfill and resurfacing, and bear the cost of such repairs. If the Contractor does not make the repairs after 10 days of the notice, the City is hereby authorized to make such repairs and the Contractor and Surety shall bear the cost.
In the case of an emergency where, in the opinion of the City, the delay could cause serious loss or damage, repairs may be made without written notice being sent to the Contractor or Surety, and all expense in connection therewith shall be charged to the Contractor and Surety.
The foregoing obligations shall be secured by Warranty Bond, per Section 1-7.2 – CONTRACT BONDS, in a form approved by the City Engineer in an amount not less than ten percent (10%) of the contract price, or $2,000.00, whichever is greater, and shall be delivered to the City Engineer prior to issuance of Notice to Proceed for Construction.
This article does not, in any way, limit the guarantee on items for which a longer guarantee is specified or on any items for which a manufacturer gives a guarantee for a longer period, nor does it limit other remedies of the City in respect to latent defect, fraud, or implied warranties.
Contractor’s bonds shall remain in force during the warranty period. Payment for fulfilling the requirements of this section shall be considered as included in the prices for various Contract items of work and no additional compensation shall be allowed therefore.
SECTION 4 – CONTROL OF MATERIALS
4-2 PROTECTION.
Insert at end of first (1st) paragraph:
No materials shall be stored in the public right-of-way.
Insert the following after the first (1st) Paragraph:
All packaged, manufactured products or materials for use in the Project shall be delivered to the site in their original unopened containers, bearing the Manufacturer’s name and the brand name
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -117-
SPECIFICATIONS
of the product. Whenever any product or material is selected to be used in the Project, all such items shall be of the same manufacturer, brand and type throughout the Project. 4-2.1 Contractor’s Responsibility.
Add the following Subsection:
The Contractor shall have the charge and care of the Project Limits until the formal acceptance of the Project by City Council and will be at risk for loss or damage to any part of the Work by the action of the elements or from non-execution of the Work. The Contractor shall rebuild, repair, restore any and all damages to completed Work and areas within the Project Limits after the commencement and before the final acceptance of the Work at their expense, with the exception of damages as are occasioned by acts of the Federal Government or the public enemy. In the case of the Suspension of Work, per Section 6-6, the Contractor shall be responsible for all materials stored on site, if necessary, shall erect or provide a temporary protective structure. 4-4 TESTING.
Insert the following before the first paragraph:
All materials proposed for use may be tested at any time during their preparation and use. If, after trial, it is found that sources of supply that have been approved do not furnish a uniform product, or if the product from any source proves unacceptable at any time, the Contractor shall furnish approved material from other approve sources. After approval, any material which becomes unfit for use due to improper storage, handling, or any other reason, shall be rejected.
Delete the following and Insert:
Delete: “Unless otherwise specified in the Special Provisions, all initial testing and a reasonable amount of retesting will be performed under the direction of the Engineer, and at no expense to the Contractor. If the Contractor is to provide and pay for testing, it will be specified in the Special Provisions.”
4-4.1 DEFECTIVE MATERIALS.
Add the following Subsection:
All materials not conforming to the requirements of these Specifications shall be considered as defective and all such materials, whether in place or not, shall be rejected and shall be removed immediately from the site of the work unless otherwise permitted by the Engineer. No rejected materials, the defects of which have been subsequently corrected, shall be used until approval in writing has been given by the Engineer. Upon failure of the Contractor to comply with any order of the Engineer made under the provisions of this article, the Engineer shall have the authority to remove and replace defective material and to deduct the cost of removal and replacement from any monies due or to become due the Contractor.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -118-
SPECIFICATIONS
SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES
5-4 INSURANCE.
5-4.1 General.
Add as first (1st) Paragraph:
The Contractor or any Subcontractors for this Project shall not commence work under the Contract until the City has received and approved the required certificates for the policies listed in 5-4 INSURANCE.
Add after first (1st) sentence of first (1st) Paragraph:
The City and any public entity or special district for which the City Council is the Governing Body, and their agents, officers and employees, shall not be responsible for any liability arising under this Contract.
5-4.1.1 Term of Coverage.
Add the following Subsection:
The Contractor shall obtain and maintain for the life of the Contract, General Liability Insurance (Section 5-4.2). The Contractor shall have the charge and care of the Project Limits until the formal acceptance of the Project by City Council and shall bear the liability of accident, loss or damage to any part of the Work.
5-4.1.2 Endorsements.
Add the following Subsection:
a) The City and any public entity or special district for which the City Council is the Governing Body, and their agents, officers and employees, shall be additional Insured(s) while acting within the scope of their duties against all claims arising out of or in connection with the work to be performed.
b) It is hereby understood and agreed that the Policy to which this certificate refers may not be canceled, materially changed, reduction to the amount of coverage or allow the policy to lapse until 30 days after receipt of registered notice (per Section 5-2 SPECIAL NOTICES) by the City Clerk.
5-4.2 General Liability Insurance.
Add the following paragraph after table:
Personal Injury shall also include Bodily Injury. The following “Limits of Liability” shall be a included in the policy, not less than one million dollars ($1,000,000.00) for all damages arising out of bodily injury or death of one (1) individual and not less than two million dollars
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -119-
SPECIFICATIONS
($2,000,000.00) for all damages arising out of bodily injuries to or death of more than one person in any one event.
5-4.4 Auto Liability Insurance.
Replace first (1st) sentence with:
The Contractor shall provide a certificate of insurance to the Agency showing coverage against liability for damages for bodily injury including death resulting from a single incident in the amount of not less than one million dollars ($1,000,000.00) for one individual, and two million dollars ($2,000,000.00) for more than one individual.
Coverage for auto related property damages shall be in the sum of one million dollars ($1,000,000.00) resulting from any one accident which may arise from the operations of the Contractor performing Work under this Contract.
5-7 SAFETY.
5-7.1 General.
Insert the follow after last paragraph:
Unusual conditions may arise on the work which will require that immediate and unusual provisions be made to protect the public from danger or loss or damage to life and property, due directly or indirectly to the prosecution of the Work, and it is part of the service required of the Contractor to make such provisions and to furnish such protection.
The Contractor shall use such foresight and shall take such steps and precautions as the Contractor’s operations make necessary to protect the public from danger or damage, or loss of life or property, which would result from the interruption or contamination of public water supply, irrigation, or other public service or from the failure of partly completed work.
Whenever, in the opinion of the Engineer, an emergency exists against which the Contractor has not taken sufficient precaution for the safety of the public or the protection of utilities or of adjacent structures or property which may be injured by process of construction on account of such neglect; and whenever, in the opinion of the Engineer, immediate action shall be considered necessary in order to protect public or private personnel or property interests, or prevent likely loss of human life or damage on account of the operations under the contract, then and in that event the City may provide suitable protection to said interest by causing such work to be done and material to be furnished as, in the opinion of the Engineer, may seem reasonable and necessary.
The cost and expense of said labor and material together with the cost and expense of such repairs as may be deemed necessary shall be borne by the Contractor, and if the Contractor shall not pay said cost and expense upon presentation of bills therefore, duly certified by the Engineer,
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -120-
SPECIFICATIONS
then said cost and expense will be paid by the City and shall thereafter be deducted from any amounts due, or which may become due said Contractor. Failure of the City, however, to take such precautionary measure shall not relieve the Contractor of the full responsibility for public safety. The foregoing provisions are in addition to and not in limitation of any other rights or remedies available to the City.
The Contractor shall submit a lump sum bid price as per the bidding schedule in Section C for removing and installing, as appropriate, all traffic signing and striping as shown on the plans and as specified in these Special Provisions.
SECTION 6 – PROSECUTION AND PROGRESS OF WORK
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK. 6-1.1 Construction Schedule.
Insert after first (1st) sentence:
The Contractor shall review the plans and specifications and submit a written work schedule to the City for approval at least 15 calendar days prior to starting work. The schedule shall designate the order that the work will progress, no work shall be started until the schedule is approved by the Engineer. The Contractor shall not commence construction on any section of the work until such time that all materials will be available when needed. The Contractor shall submit an updated construction schedule at each progress meeting and upon the issuance of any change order that alters the contract’s schedule.
Insert after first (1st) paragraph:
The project schedule shall include the dates the Contractor anticipates performing exploratory excavations and providing the pothole information to the Engineer. Grade and/or alignment changes shall be made only if approved by the Engineer. 6-1.2 Commencement of the Work
Substitute the paragraph in its entirety with the following:
6-1.2.1 Notice to Proceed for Procurement. Upon receiving the written Notice to Proceed for Procurement, the Contractor shall order all equipment required for the project, and within fifteen (15) calendar days following the date of issuance of the Notice to Proceed for Procurement, the contractor shall submit evidence of material ordered, including the estimated delivery date.
6-1.2.2 Notice to Proceed for Construction. The Contract Time shall commence on the date of issuance of the City’s written Notice to Proceed for Construction, the Contractor shall begin work within 15 calendar days after the issuance of the Notice to Proceed for Construction. The
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -121-
SPECIFICATIONS
Contractor shall diligently prosecute all work to completion within sixty (60) working days. As stipulated in Section 6-9 – Liquidated Damages, failure to complete all work within sixty (60) working days will result in assessment of Project Completion Liquidated Damages in the amount specified.
Traffic control plans shall be submitted for review and approved by the City prior to commencement of work.
6-1.2.3 Contractor’s Daily Reports. The Contractor shall complete a daily report indicating manpower, major equipment, subcontractors, etc. involved in the performance of the Work. The daily report shall be completed on forms prepared by the Contractor and approved by the Engineer, and shall be submitted to the Engineer at the conclusion of each Work day. 6-2 PROSECUTION OF THE WORK.
Insert the following after the second paragraph:
All loss or damage arising out of the nature of the Work to be done under the Contract, or from any unforeseen obstruction or difficulties which may be encountered during the progress of the Work and in the prosecution of the same, or from the action of the elements, or from encumbrances on the line of the Work, shall be sustained by the Contractor.
All work, which is defective in its construction or deficient in any of the requirements of the Specifications, shall be remedied or removed and replaced by the Contractor in an acceptable manner at the Contractor’s own expense. Upon failure on the part of the Contractor to comply forthwith with any order from the Engineer, made under the provisions of this article, the Engineer and City may cause the defective work to be remedied or removed and replaced at the expense of the Contractor.
6-2.1 Noncompliance with Plans and Specification.
Add the following Subsection:
Failure of the Contractor to comply with any requirements of the Plans and Specifications and the immediate remedy of any such noncompliance following notice from the Engineer; may result in suspension of contract payments on all items of work. Any progress payments so suspended shall remain in suspension until the Contractor’s operations are brought into compliance to the satisfaction of the Engineer. Upon determination of the Engineer that the Contractor is no longer in noncompliance, the progress payments will resume. No additional compensation shall be due to the Contractor as a result of the suspension of the progress payments due to noncompliance.
6.3 TIME OF COMPLETION.
6.3.1 General.
Substitute the following for the first sentence:
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -122-
SPECIFICATIONS
The Contractor shall complete the Work within sixty (60) working days from the date of the Notice to Proceed – Construction is issued.
6-3.1.1 Work Days.
Add the following Subsection:
No work shall be done between the hours of 4:00 P.M. and 7:00 A.M., nor on Saturdays, Sundays, or legal holidays without the permission of the Engineer and in the presence of the Engineer's inspector, except in case of any emergency. In all cases, the Contractor shall reimburse the Engineer for any expenses incurred as a result of work performed by the Contractor outside of regular working hours. This includes, but is not limited to, payment of Engineer's inspector at the appropriate overtime wage rate.
If required, night work shall be performed from 9 pm to 5 am. If night work is authorized by the City, inspection will be provided by the City at no cost to the contractor. The Contractor is expected to provide revised traffic control plan with adequate lighting for proper prosecution of the night Work, for the safety of the workers and the public, and for proper inspection at no extra cost to the City.
6-4 DELAYS AND EXTENSION OF TIME.
Add the following Subsection:
6-4.1.1 Avoidable Delays.
Avoidable delays in the prosecution or completion of the Work shall include all delays, which in the opinion of the Engineer would have been avoided by the exercise of care, prudence, foresight and diligence on the part of the Contractor or the Contractor’s subcontractors. The following shall be considered avoidable delays within the meaning of the contract: 1) Delay in the prosecution of parts of the Work which may in themselves be unavoidable but do not necessarily prevent or delay the prosecution of other parts of the Work nor the completion of the whole Work within the time herein specified; 2) Reasonable loss of time resulting from the necessity of submitted samples of materials and drawings to the Engineer for approval and from making of tests of materials, measurements and inspections; 3) Reasonable interference of other contractors employed by the City which do not necessarily prevent the completion of the whole Work within the time agreed upon. Unavoidable delays, which may be considered for an extension of time for completion of the Work, shall include, but not be limited to, acts of God, acts of war, or labor strikes.
6-4.2 Extensions of Time.
Insert after first (1st) paragraph:
If unavoidable delays are encountered, or if the City directs the work such that delays in the contract schedule are incurred, the Contractor shall be allowed an extension of time in which to
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -123-
SPECIFICATIONS
complete the Work. The Contractor must submit a written request for extension of work with stated reasons for the delay. The extension of work shall be equal to the sum of all unavoidable delays, as determined above or by the City Engineer, plus any adjustment of contract time due to contract change orders. During such extension of time, neither compensation for extra engineering and inspection nor liquidated damages shall be charged to the Contractor.
Applications for an extension of time shall be made in writing before the expiration of the time for completion and not more than 15 days after the beginning of any unavoidable delay. 6-5 USE OF IMPROVEMENT DURING CONSTRUCTION.
Add the following Subsection:
6-5.1 Use of Improvement – Exceptions – The provisions of Subsection 6-5, USE OF IMPROVEMENT DURING CONSTRUCTION, shall not apply to projects for the repair, modification, enlargement or improvement of existing improvements that are to remain in use during construction except where a portion of the Work is completely independent from the rest of the Work can be completed and put into use by the Agency.
Projects on public roads, after satisfactory completion of an isolated section of the Work involving roadway improvements or repairs, when all temporary signs and other temporary Contractor facilities have been removed, the section is not being used as a detour, the section is no longer under the Contractor’s control, and the section is opened to public traffic through the end of the Contract period, that section of the Work shall be taken over by the Agency as provided in Subsection 6-5, USE OF IMPROVEMENT DURING CONSTRUCTION. The Contractor shall submit to the Engineer in writing, when the conditions of this paragraph have been complied with and shall specify the limits of the public road section involved. Any use of the Work by the Agency shall be effective only when formal written notification is issued by the Agency. 6-6 SUSPENSION OF THE WORK.
6-6.1 General
Substitute the first paragraph with the following:
The City or the Engineer shall have the authority to suspend the Work, wholly or in part, for such period as the City or the Engineer may deem necessary, due to unsuitable weather or other such conditions as are considered unfavorable for the suitable prosecution of the Work, or for such time as the City or the Engineer deems necessary due to the failure on the part of the Contractor to carry out orders given or to perform any provisions of the Work. The Contractor shall immediately comply with the written order of the City or the Engineer to suspend the Work wholly or in part and shall not resume the Work until ordered to do so in writing by the City or the Engineer. Such suspension shall be without liability to the Contractor on the part of the City except as otherwise specified in 6-4.3.
In the event a suspension of work is ordered because of failure on the part of the Contractor to carry out orders given or to perform any provisions of the Work, such suspension of work shall not relieve the Contractor of the Contractor’s responsibility to complete the Work within the
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -124-
SPECIFICATIONS
time limit set forth herein and shall not be considered cause for extension of the time for completion and, further, such suspension of work shall not entitle the Contractor to any additional compensation.
6-9 LIQUIDATED DAMAGES.
Substitute both paragraphs with the following:
6-9.1 Project Completion Liquidated Damages.
Time is of the essence for the completion of this project. For each and every day that any portion of the work remains unfinished after the time fixed for completion as noted in Subsection 6-3.1 TIME OF COMPLETION, General or as modified by any extension of time granted pursuant to Subsection 6-4.2 – Extensions of Time, damage will be sustained by the City. Because of the difficulty in computing the actual material loss and disadvantage to the City, it is determined in advance and agreed to by the parties hereto that the Contractor shall pay the City the amount of damages set forth herein as representing a reasonable forecast of the actual damages which the City will suffer by the failure of the Contractor to complete the work within the stipulated time.
The Execution of the Agreement shall constitute acknowledgment of the Contractor and that the Contractor has ascertained and agrees that the City will actually suffer damages in the amount herein fixed for each and every calendar day during which the completion of the work is avoidably delayed beyond the stipulated completion date.
The Contractor shall have no claim or right of action against the City for damages, costs, expenses, loss of profits, due to any type of delay within or without the Contractor's control, and whether or not any delay may have resulted from any action by the City. The fulfillment of the contract shall be within the number of working days as stated in the Contract Documents or as modified by any extension of time.
The Contractor will not be assessed with liquidated damages during the delay in the completion of the work caused by acts of God or of the Public Enemy, acts of the State, fire not due to acts of contractors or subcontractors, floods, epidemics, quarantine, restrictions, strikes, freight embargo or unusually severe weather, or delays of subcontractors due to such causes provided that the Contractor shall within ten (10) days from the beginning of such delay notify the City, in writing, of the cause of the delay. The City will ascertain the facts and the extent of the delay, and the findings thereon shall be final and conclusive. Damages for avoidable delays shall be in the amount of $1,000 (One-Thousand Dollars), per calendar day in excess of the time specified for completion of the Work. Such sum may be deducted from payments due the Contractor if such delay occurs.
6-9.2 Interim Milestone Liquidated Damages.
When existing traffic striping and markings are obliterated and subsequent pavement improvements are completed, the Contractor shall cat-track the striping and markings to be installed within two (2) working days. Upon receiving approval of the cat-tracks by the Engineer,
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -125-
SPECIFICATIONS
the Contractor shall install the striping and markings, including appurtenant traffic signs as specified in the Plans and Specifications, within two (2) working days. Traffic detector loops, including lead-in cables, as specified in the Plans and Specifications, shall be installed within two (2) working days following the installation of the striping and markings. Interim Milestone Liquidated damages shall be in the amount of $1,000.00 (One-Thousand Dollars) per calendar day, should the cat-track, striping and markings, and the traffic detectors loops are not be completed and approved by the Engineer within the specified time. The sum of Interim Milestone Liquidated Damages shall be deducted from payments due to the Contractor, if such a delay occurs. These liquidated damages shall be in addition to the Project Completion Liquidated Damages as specified in Subsection 6-9.1.
SECTION 7 – MEASUREMENT AND PAYMENT
7-3 PAYMENT.
7-3.1 General.
Insert after first (1st) paragraph:
Payment for all work bid at a price per unit of measurement shall be based upon the actual quantities of work constructed in accordance with the Plans and Specifications and as measured upon completion. The City does not expressly or by implication agree that the actual amount of work or materials of any class will correspond to the estimated quantities given in the bid proposal.
The prices paid for the various items in the bid proposal shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals necessary to complete the finished product as provided in these specifications. Compensation in full for items specified as "Lump Sum" in the bid proposal shall include payment for furnishing all labor, materials, tools, equipment, and incidentals necessary for Specifications.
Insert after last paragraph:
Pursuant to Chapter 7 of California Codes for Public Works Contracts, § 7100, the Contractor shall furnish the City with a release of all claims against the City prior to final payment. The forms provided in these Specifications titled Contractor's Affidavit of Release of Liens and Subcontractor's Final Waiver of Lien, shall be completed and returned to the Engineer prior to final acceptance by City.
7.3-2 Partial and Final Payment.
Replace the first sentence of the second paragraph with the following:
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -126-
SPECIFICATIONS
The Contractor will submit the monthly progress payment estimate each month. Payments shall be made within forty-five (45) calendar days after review of the monthly progress payment estimate by the Engineer and Inspector.
Substitute the third paragraph with the following:
The City shall retain five percent (5%) of the estimated value of the work done and will pay monthly to the Contractor the balance, after deducting all previous payments and all sums to be kept or retained under the provisions of this Contract. No such progress payment or estimate shall be required to be made when the total number of working days is thirty (30) or less, or when in the judgment of the Engineer the Work is not proceeding in accordance with provisions of the contract, or when the value of the Work amounts to less than Five Hundred Dollars ($500.00).
No such estimate or payment shall be construed to be an acceptance of any defective work or improper materials.
In lieu of the five percent retention deducted from the progress payment, and at the request and expense of the Contractor, securities equivalent to the retention shall be deposited with the public City, any person licensed under the Escrow Law in the Financial Code, or with a state or federally chartered bank in California as the escrow agent, who shall pay such monies to the Contractor upon satisfactory completion of the contract. Securities eligible for investment under this Section shall include those listed in Section 16430 of the government code or bank or savings and loan certificates of deposit. The Contractor shall be the beneficial owner of any securities substituted for monies retained and shall receive any interest thereon.
The Contractor shall notify the Engineer of the completion of the Work and the Engineer shall make an inspection of the Work. The Engineer will not make the final inspection until the Work provided for and contemplated by the Contractor has been completed and the final clean up performed. The Contractor may be present at the final inspection. The Contractor will be notified in writing of any defects or deficiencies to be remedied. When notified that corrective work is completed, the Engineer will again inspect the Work and when the Engineer has satisfied himself/herself that all work has been done in accordance with the plans and specifications, the Engineer will recommend to the Council that the Work be formally accepted. 7-3.5 Contract Unit Prices
7-3.5.1 General
Add the following to the end of the section:
7-3.5.1 (a) Definition of Bid Items
The Unit Prices and Lump Sum amounts to be paid for the Items listed in the Bid Schedule shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals necessary for the completed work, including incidental work not explicitly stated but inherently required to complete the work described in the bid items, in accordance with the Plans and Specifications. Said price and payment of the bid items shall include the Contractor’s costs
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -127-
SPECIFICATIONS
associated with bonding, insurance, worker’s compensation, overhead, financing, obtaining required permits and permit fees, mobilization, traffic control, public convenience and safety, protective barricading, sanitary facilities, storage of equipment and materials, security against theft and vandalism, project site maintenance, dust and runoff, clean-up and all other items incidental to the work.
Payment for Unit Price work shall be made for the actual quantities of Contract Items removed, relocated, procured, installed, constructed, tested, hauled away, disposed of, etc., in accordance with the plans and these Specifications as specified in Section 7-1.2 Methods of Measurement.
Payment for Lump Sum work shall be paid for at the price indicated in the Bid Schedule, in accordance with Section 7-2, “Lump Sum Work.”
The following are descriptions of the items in the Base Bid and Alternate Bid Schedules. The descriptions represent general descriptions for the purpose of clarifying the scope of the Bid Items. If any overlap or discrepancy exists between the following general descriptions and the detailed contents of the Technical Specifications (Part 2 of these Specifications), the moredetailed description shall hold. Additionally, if any item of work is not included in either the descriptions below, or in the Technical Specifications, it shall be assumed as inherently included within the bid items of work that most-closely covers such work. Example: raising existing manholes/valves to finished grade shall be included in Bid Item 6 (AC Pavement).
1. Bid Item 1: Mobilization & Demobilization (Not to Exceed 5% of Total Bid) Work under this item shall include but not be limited to, those necessary for the movement of personnel, equipment, materials and incidentals to the Project sites, securing a temporary construction yard, performing exploratory excavation at the connection points at the new water main, and laterals and maintaining the Project sites in a safe and orderly manner during construction. This item also includes costs incurred for securing bonds, insurance and financing prior to beginning work. Work included under this pay item will be paid after all equipment has been mobilized to sites and after, in the judgment of the City, work has commenced. Additional clarification on the scope of this bid item is included in the Technical Specifications.
Payment shall be at the lump sum (LS) price.
2. Bid Item 2: Traffic Control (Not to Exceed 3% of Total Bid) Work under this item shall include, but not be limited to, furnishing, installing, maintaining, and removing all traffic control devices, including signs, barricades, lights, cones, providing flaggers, and all other work necessary to provide vehicular and pedestrian traffic control in and around the construction sites as shown on the Plans and required by regulatory agencies, complete.
Payment shall be at the lump sum (LS).
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -128-
SPECIFICATIONS
3. Bid Item 3: Water Pollution Control
Work under this item shall include, but not be limited to, preparation of PRDs, including SWPPP, NOI, NOT, procurement, implementation, maintenance, and removal of BMPs, and all other work required to maintain water pollution control per Federal, State, and Local/Regional MS4/NPDES Regulations.
Payment shall be at the lump sum (LS) price.
4. Bid Item 4: Demolition
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for the demolition/removal, and haul away of existing surface improvements not directly associated with other bid items of work, including fencing, shrubs, weeds, rocks, debris/garbage, concrete slab at Station 14+00, tree stump & roots at Station 16+20, and all other miscellaneous demolition work that allows for other bid items of work to proceed. This work does not include removal of existing subgrade soil that is associated with asphalt concrete and concrete improvements.
Payment shall be at the lump sum (LS) price.
5. Bid Item 5: PCC Curb & Gutter
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for removal and grading of existing subgrade sufficient for final flowline (including base material under curb & gutter), furnishing and installation of base material (CMB), furnishing and installation of concrete formwork, furnishing and installation/constructing of concrete curb & gutter of the type mentioned in these specifications (560-C-3250), at the locations shown on these plans, including any asphalt lips for concrete formwork, and all other incidental work.
Payment shall be at the unit price bid per linear foot (LF), constructed in place.
6. Bid Item 6: AC Pavement (Full-Depth AC & Base)
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for removal and grading of existing subgrade sufficient for final finished surface (including base material under the asphalt concrete layers), scarification, re-compaction, compaction testing of subgrade, furnishing and installation of base material (Class II Base), compaction and compaction testing of base material, furnishing and installation of asphalt concrete (AC base/leveling and ARHM surface course), rolling/compaction of asphalt layers (each lift), at the locations shown on these plans, any all other incidental work.
Payment shall be at the unit price bid per square foot (SF), constructed in place.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -129-
SPECIFICATIONS
7. Bid Item 7: New Fire Hydrant Assembly
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for fire hydrant construction at the location(s) shown and per the detail(s) on the plans, including excavation, dewatering, bedding, furnishing & installation of pipe, tee/fittings, connection to existing pipe, valves, hydrant bury, thrust blocks at tee & bury, hydrant head, check valves, break-away spools, pressure testing, disinfection, backfill, compaction, compaction testing, and all other incidental work.
Payment shall be at the unit price bid per each (EA), constructed in place.
8. Bid Item 8: New Water Service
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for water service construction at the location(s) shown and per the detail(s) on the plans, including excavation, dewatering, bedding, furnishing & installation of water service pipe, service saddle, corp stop, connection to existing pipe, bends, angle stop valve, couplings, nipples, water meter box, crushed rock under water meter box, paying for water meter and coordination with City for water meter installation, pressure testing, disinfection, backfill, compaction, compaction testing, and all other incidental work.
Payment shall be at the unit price per each (EA), constructed in place.
9. Bid Item 9: New Sewer Service
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for sewer service construction at the location(s) shown and per the detail(s) on the plans, including excavation, dewatering, bedding, furnishing & installation of sewer service pipe, wye, connection to existing pipe, bends, cleanout riser, end caps, backfill, compaction, compaction testing, and all other incidental work.
Payment shall be at the unit price per each (EA), constructed in place.
10. Bid Item 10: New Street Light
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for street light construction at the location(s) shown and per the detail(s) on the plans, including excavation, dewatering, bedding, furnishing & installation of concrete and rebar for footing, furnishing and installation of conduit & wire within proximity of street light (from pull box to street light) for electrical service, furnishing and installation of street light, mast arm, and luminaire, set-up and wiring of street light, and all other incidental work.
Payment shall be at the unit price per each (EA), constructed in place.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -130-
SPECIFICATIONS
11. Bid Item 1A: Additional PCC Curb & Gutter
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for removal and grading of existing subgrade sufficient for final flowline (including base material under curb & gutter), furnishing and installation of base material (CMB), furnishing and installation of concrete formwork, furnishing and installation/constructing of concrete curb & gutter of the type mentioned in these specifications (560-C-3250), at the locations shown on these plans, including any asphalt lips for concrete formwork, and all other incidental work.
Payment shall be at the unit price bid per linear foot (LF), constructed in place.
12. Bid Item 2A: PCC Sidewalk
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for removal and grading of existing subgrade sufficient for final sidewalk grade (including base material under sidewalk), furnishing and installation of base material (CMB), furnishing and installation of concrete formwork, furnishing and installation/constructing of concrete sidewalk of the type mentioned in these specifications (560-C-3250), at the locations shown on these plans.
Payment shall be at the square foot (SF) price.
13. Bid Item 3A: Commercial Driveway Approach
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for removal and grading of existing subgrade sufficient for final driveway grade (including base material under driveway), furnishing and installation of base material (CMB), furnishing and installation of concrete formwork, furnishing and installation/constructing of concrete driveway of the type mentioned in these specifications (560-C-3250), at the locations shown on these plans.
Payment shall be at the unit price bid per each (EA), constructed in place.
14. Bid Item 4A: Curb Ramp (ADA Pedestrian Access Ramp) Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for removal and grading of existing subgrade sufficient for final curb ramp grade (including base material under curb ramp), furnishing and installation of base material (CMB), furnishing and installation of concrete formwork, furnishing and installation/constructing of concrete curb ramp of the type mentioned in these specifications (560-C-3250), at the locations shown on these plans.
Payment shall be at the unit price bid per each (EA), constructed in place.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -131-
SPECIFICATIONS
15. Bid Item 5A: 2” Grind & Overlay
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for grinding of existing asphalt pavement, removal and disposal of pavement grindings offsite, application of tack coats to adhere to existing grinded pavement, furnishing and installation of asphalt rubberized hot mix (ARHM) over tack coat, rolling/compaction of ARHM, and any/all other incidental work.
Payment shall be at the unit price bid per square foot (SF), constructed in place
16. Bid Item 6A: Relocate/Extend Existing Fire Hydrant Assembly Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for fire hydrant construction at the location(s) shown and per the detail(s) on the plans, including excavation, dewatering, bedding, removal of existing hydrant head, bury, bend, valve, and thrust block, furnishing & installation of pipe, fittings, connection to existing pipe, valves, hydrant bury, hydrant head, check valves, break-away spools, thrust block at hydrant bury, pressure testing, disinfection, backfill, compaction, compaction testing, and all other incidental work.
Payment shall be at the unit price bid per each (EA), constructed in place.
17. Bid Item 7A: Coordination with IID and Utility Companies for Removal and Relocation of Existing Power Poles (6), Overhead Wires/Conduits, Service Risers, & Appurtenances (All Work Performed by IID)
Work under this item shall include, but not be limited to, furnishing and installing staff time/effort to coordinate with IID and Utility Companies for the relocation of power poles (6) and power lines. The intent is to schedule the Contractor’s work in such a manner that any items of the Contractor’s work that can occur without conflict around IID/Utility Company work can proceed (i.e. demolition and/or construction of southerly concrete curb & gutter), and that any work that will need to succeed the relocation work will not commence until the relocations have been completed. This bid item provides an allowance at an hourly billing rate for the Contractor’s Project Manager/Superintendent, and will only be billed for such time of work actually incurred specifically related to IID/ Utility Company coordination, and not general scheduling of Contractor’s work.
Payment shall be at the hourly rate (HR) price, multiplied by the actual number of hours expended.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -132-
SPECIFICATIONS
18. Bid Item 8A: Furnish & Install New Conduit/Wire, and Pull Boxes Along North Side of Weakley Street for Base Bid Streetlights (2). One (1) 1.5” PVC Sch. 80 Conduit, Concrete Encased, with #8 AWG. Three (3) Pull Boxes with Fusing and Grounding Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for furnishing of new conduit and wire to connect from IID-installed transformer and/or sector sleeve to proposed City-owned street lights, including conduit bends/fittings, pull boxes and fusing/grounding in pull boxes, conduit trenching, bedding, concrete encasement, backfill of trenches, and all other incidental work.
Payment shall be at the linear foot (LF) price.
19. Bid Item 9A: Additional Street Light
Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for street light construction at the location(s) shown and per the detail(s) on the plans, including excavation, dewatering, bedding, furnishing & installation of concrete and rebar for footing, furnishing and installation of conduit & wire within proximity of street light (from pull box to street light) for electrical service, furnishing and installation of street light, mast arm, and luminaire, set-up and wiring of street light, and all other incidental work.
Payment shall be at the unit price per each (EA), constructed in place.
20. Bid Item 10A: Furnish & Install Additional New Conduit/Wire, and Pull Boxes Along North Side of Weakley Street for Additional Streetlights (1). One (1) 1.5” PVC Sch. 80 Conduit, Concrete Encased, with #8 AWG. Two (2) Pull Boxes with Fusing and Grounding Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for furnishing of new conduit and wire to connect from IID-installed transformer and/or sector sleeve to proposed City-owned street lights, including conduit bends/fittings, pull boxes and fusing/grounding in pull boxes, conduit trenching, bedding, concrete encasement, backfill of trenches, and all other incidental work.
Payment shall be at the linear foot (LF) price.
21. Bid Item 11A: Furnish & Install New Conduit/Wire Across Weakley Street (Easterly Side at Station 15+85) as Shown on Plans. Two (2) 5” PVC Sch. 80 Conduits, ConcreteEncased at 3’ min. depth. Stub-Out at Southerly Property Line at APN 058-030-052 Work under this item shall include, but not be limited to, furnishing and installing labor, tools, material, submittals for review, and equipment necessary for furnishing of new conduit to connect from IID-installed sector sleeve to southerly side of Weakley Street, to the southerly ROW/Property Line, including conduit bends/fittings, conduit
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -133-
SPECIFICATIONS
trenching, bedding, concrete encasement, backfill of trenches, conduit stub out, and all other incidental work.
Payment shall be at the linear foot (LF) price.
Provided that there are no changes to the Plans, Specs, or field conditions, any work that is inherently required to complete the improvements, even if not explicitly stated or implied by the bid items, is not entitled to additional compensation/change order. Prior to bid, it shall be the Contractor’s responsibility to thoroughly review the Plans and Specifications, investigate the site, submit any questions/RFIs to the City, and submit a good-faith bid to the City. 7-3.5.2 Increases of More Than 25 Percent
Substitute the first paragraph of the section with the following:
Should the actual quantity of an item of work covered by a Contract Unit price and constructed in conformance with the Plans and Specifications exceed the bid item by more than twenty five percent (25%), the Contractor shall notify the Engineer in writing (hereinafter called “Quantity Exceedance Notice”) within five (5) working days. Payment for the quantity in excess of 125 percent of the Bid quantity shall be made at the Contract Unit Price, or at the option of the City, on the basis of Extra Work per 7-4. No exceptions shall be granted unless requested and specified by the Contractor in the Quantity Exceedance Notice. If so requested, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and City. Adjustments to the Contract Unit Price per Section 7-4 will only be made if the extra work has been performed other than the contract bid items, under special circumstances that justify the extra costs, such as night work, greater depth of trenching, etc. 7-3.5.3 Decreases of More Than 25 Percent
Replace the Section in its entirety with the following:
Should the actual quantity of an item of work covered by a Contract Unit Price, and constructed in conformance with the Plans and Specifications, be less than 75 percent of the Bid quantity, an adjustment in payment will not be made unless so requested in writing by the Contractor. The request shall be submitted and received by the Agency within 5 (five) working days upon substantial completion of the specific work item. If the Contractor so requests, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency; or at the option of the Engineer, on the basis of Extra Work per 7-4 Payment for Extra Work or on the basis of actual quantity at the Contract Unit Price plus the actual costs incurred in connection with not completing up to the 75 percent of the Bid quantity.
However, in no case shall payment be less than would be made for the actual quantity at the Contract Unit Price, nor more than would be made for seventy-five (75) percent of the Bid quantity at the Contract Unit Price.
For the purpose of this section, actual costs incurred in connection with not completing up to 75 percent of the bid quantity shall be limited to the following:
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -134-
SPECIFICATIONS
(a) If material conforming to the Plans and Specifications was ordered by the Contractor for use in completing the item of work, and if the order for that material cannot be canceled, payment will be made to the Contractor for the actual cost of the unused material between the actual constructed quantity and the Bid quantity. In this case, the material shall become property of the Agency. If the material is returnable, the unused material between the actual constructed quantity and the Bid quantity shall be returned, and payment will be made to the Contractor for the actual charges made by the supplier for returning the material and for handling by the Contractor.
(b) If equipment was rented by the Contractor for use in completing the specific item of work and for no other, item of work, and if there is a minimum number of rental days charged by the vendor, the Contractor shall submit documentation showing the number of days the equipment was used for the work item and the minimum rental days charged by the vendor. Payment will be made to the Contractor for the equipment rental in proportion to the unused rental days and the minimum rental days.
7-4 PAYMENT FOR EXTRA WORK
7-4.3 Markup
Add the following the paragraph at the beginning of the Section:
Unless otherwise specified in the Special Provisions, the markup, as determined by Section 7-4.2 “Basis for Establishing Costs”, shall be as described below, and shall constitute the full markup for all overhead and profit on extra work performed under this contract; no additional compensation will be provided therefore.
7-4.3.1 Work by the Contractor. Replace the entire paragraph with the following:
The following percentages shall be added to the Contractor’s costs and shall constitute the full markup for all overhead and profit on extra work performed by the Contractor under this contract; no additional compensation will be provided therefore:
1) Labor ………………………………………………………20%
2) Materials ………………………………………………..15%
3) Tools and Equipment Rental ………..…………15%
4) Other Items …………………………………………….15%
To the sum of the costs and markups provided for in this subsection, 1 percent shall be added as compensation for bonding.
7-4.3.2 Work by a Subcontractor. Replace the entire paragraph with the following:
When all or any part of the “extra work” is performed by a Subcontractor, the markup established in 3-3.2.3 (a) shall be applied to the Subcontractor’s actual cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the “extra work” and a markup of 5
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -135-
SPECIFICATIONS
percent on work added in excess of $5,000 of the subcontracted portion of the “extra work” may be added by the Contractor. These markups shall constitute the markup for all overhead and profit for the Contractor on work performed by the Subcontractor.
The markups specified in Parts (a) and (b) above shall be considered as including, but not limited to, the Contractor’s labor costs for personnel not working directly on the “extra work”, including the cost of any tools and equipment that they may use. Such costs shall not be reported as labor or equipment costs elsewhere except when they are actually used in the performance of the “extra work.” Labor costs shall in that case be reported for the labor classification corresponding to the type and nature of “extra work” performed.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -136-
SPECIFICATIONS
PART 2 – TECHNICAL SPECIFICATIONS
(BASED ON BID ITEMS OF WORK)
CONTENTS
1. MOBILIZATION ......................................................................................................... 136
2. TRAFFIC CONTROL ..................................................................................................... 138
3. CONSTRUCTION SURVEYING ....................................................................................... 143
4. COLD MILLING ........................................................................................................... 144
5. AC BASE/LEVELING COURSE........................................................................................ 146
6. ASPHALT RUBBERIZED HOT MIX (ARHM)...................................................................... 147
7. CONCRETE IMPROVEMENTS ....................................................................................... 160
8. UTILITY LID ADJUSTMENT ........................................................................................... 165
9. UTILITY IMPROVEMENTS (WATER, SEWER, ELECTRIC) ................................................... 166
10. STRIPING ................................................................................................................. 170
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -137-
SPECIFICATIONS
1. MOBILIZATION
Mobilization shall consist of preparatory work and operations, including but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of all offices, buildings, construction yards, sanitary facilities, permits, and any other facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items on the project site, as well as the related demobilization costs anticipated at the completion of the project. The cost of all bonds and insurance policies, including premiums and incidentals, shall be included in Mobilization.
Prior to commencement of any work on the project, a preconstruction conference will be held for the purpose of review and discussion of progress schedule and construction procedures. At the discretion of the City’s Construction Manager, periodic meetings involving project personnel (Contractor, utilities, and others) will be held for the purpose of coordinating project activities.
The work called for in these contract documents shall commence within (10) calendar days after that date set out in the Notice-to-Proceed issued by the City, and shall be diligently pursued to completion within sixty (60) working days of said date.
No additional compensation will be allowed for additional mobilizations required, including but not limited to, delays caused by the relocation of existing utility facilities shown on the plans or discovered during construction operations.
The amount credited for Mobilization on each monthly progress payment shall be based upon the percentage of the total of the amounts credited for work on all the other contract items for that monthly progress payment, up to a cumulative limit of eighty (80) percent of the contract item price for Mobilization. The remaining twenty (20) percent of the contract item price for Mobilization shall be paid with the final progress payment.
The deletion of work or the addition of extra work as provided for herein shall not affect the price paid for Mobilization.
Water Pollution Control
As part as Mobilization, Contractor shall furnish all labor, materials, tools, equipment, and incidentals for doing all the work involved in developing, preparing, obtaining approval of, revising, and amending the N.O.I., P.R.D.s, SWPPP, N.O.T., and installing, constructing, maintaining, removing, and disposing of BMPs as shown in the SWPPP, as specified in the CASQA Handbooks and Sample Contractor's Water Quality CSMP, General Permit, and these Detailed Specifications, and as directed by the Engineer. Any BMP required to protect storm water quality shall be installed within 24 hours of the time the Contractor is notified by the Engineer or regulatory agencies, or prior to the next
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -138-
SPECIFICATIONS
rain event, whichever comes first, to install such BMP’s. Each 24 hour period elapsed without installation of the required BMPs by the Contractor will be considered an Incident. Failure of the Contractor to meet the 24 hour period for installing the required BMPs will result in a permanent payment deduction of $500 for each Incident that the Contractor fails to comply, in addition to any other applicable penalties. It is the Contractor’s responsibility to install any and all required BMPs. Information on Storm Water BMPs can be obtained from the California Stormwater Quality Association (CASQA): https://www.casqa.org/resources/bmp-handbooks, from Caltrans: http://www.dot.ca.gov/hg/construc/stormwater/manuals.htm, and from the State Water Resources Control Board:
https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/ge neral_permit_reissuance.html
Sanitary Arrangements
The Contractor shall make provisions for and maintain in a sanitary manner at the work site all necessary and sanitary conveniences for the workmen, in accordance with the rules and regulations of the State Board of Health.
The Contractor’s attention is directed to the existing pedestrian and vehicular access ways crossing the lines of work. These access ways shall not be closed unless an alternate access way is provided. The Contractor shall assume full responsibility for providing alternate access. The compensation for the work in this item shall be considered as included in the cost of the various contract items of work and additional compensation will be made therefore.
Temporary Water & Power
The Contractor shall coordinate with the City and make payment to obtain hydrant meters, for use of temporary water via fire hydrants within the project vicinity.
The Contractor shall provide all temporary power during construction of the improvements.
Coordination with the City and/or the Imperial Irrigation District (IID) shall be required for permanent power to the proposed streetlight improvements.
Payment
Payment for mobilization will be measured by Lump Sum as specified on the bid schedule and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work necessary as specified in the Contract Documents and Specifications, Standard Drawings, supplemental details, these Special provisions, and as directed by the Engineer or his appointed designee. Payment shall be based on the percentage of total value of work completed as of each progress pay estimate.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -139-
SPECIFICATIONS
2. TRAFFIC CONTROL
The Contractor shall maintain traffic in the work area in accordance with the “California Manual on Uniform Traffic Controls Devices” (CAMUTCD), latest edition, available through the State of California, Department of Transportation, 1900 Royal Oaks Drive, Sacramento, California 95815.
The Contractor shall post temporary “No Parking” signs at least 72 hours in advance of commencing of work. Signs may be attached to existing poles, parkway trees, or any available support that may exist in the public right-of-way or the contractor may furnish sign supports as may be necessary. Personal vehicles of the Contractor’s employees shall not be parked on the traveled way at any time, including any section closed to public traffic.
The Contractor shall furnish, install, maintain, and remove all construction area signs in conformance with the plans and Sections 12-3.11 of the State of California Standard Specifications, Latest Edition. The construction area signs will be required 2 weeks in advance of work, describing the sequence of activities that will affect parking and access to properties, to be delivered 2 weeks prior to construction. This notice will generally address parking and access for street work with further details to follow on subsequent notices, except detailed information will be required in this first notice to explain the leveling course portion of the work.
The contractor shall make every effort to keep driveways open during working hours. After work hours, all driveways shall be accessible and safe.
The contractor shall keep a minimum of two (2) lanes open all day and during construction. Traffic control plans shall be submitted by the contactor and approved by the engineer and/or the city.
Contractor shall keep entrances to businesses open all day and during construction. After work hours, all driveways and travel lanes shall be accessible and safe In the event of conflict, the order of precedence for traffic control shall be as follows:
1. Special Provisions
2. Traffic Control Plans
3. California Manual on Uniform Traffic Control Devices (FHWA’s MUTCD Latest edition as amended for use in California), Part 6, Temporary Traffic Control, and Caltrans, Latest edition.
4. Work Area Traffic Control Handbook. (WATCH)
5. Standard Specifications
Traffic Control shall be in accordance with the following Special Provisions:
a. All streets shall remain open to through traffic at all times except when street closure is approved by the Engineer. The Contractor shall make provisions to allow local traffic access to the closed streets. The local traffic consists of, but is not limited to, residences, church congregations, farmers, post offices, meter readers, trash pickup, school buses, and emergency vehicles. The
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -140-
SPECIFICATIONS
Contractor shall provide a smooth travel way and either a flagger and/or signing to direct traffic. b. The Contractor shall be responsible for the preparation of Traffic Control Plans as necessary for the work. The Traffic Control Plans shall be signed and stamped by a California Registered Traffic Engineer and transmitted to the City for approval no later than fourteen (14) calendar days prior to the scheduled commencement of work. Comments and corrections shall be returned to the Contractor within five (5) working days. The Traffic Control Plans shall conform to the requirements listed in these Technical Provisions; California MUTCD Part 6, Temporary Traffic Control; the Work Area Traffic Control Handbook; and the Standard Specifications. c. All traffic controls and safety devices, equipment and materials, including but not limited to cones, channelizers, delineators, flashing warning lights, barricades, high level warning devices (telescoping flag trees), flags, signs, markers, portable barriers, temporary railing (Type-K), temporary fencing, flashing arrow signs, changeable message sign, markings, and flagging equipment shall be provided and maintained in “like new” condition. d. The Contractor shall furnish and properly install, construct, erect, use and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, including holidays, all said devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include areas affecting or affected by the work, from the date of Notice to Proceed to the completion and acceptance of the work.
e. High-level warning devices (telescoping flag trees) are required at all times for work being performed within the roadway unless otherwise specifically approved by the Engineer. f. All barricades shall be equipped with flashing warning lights, and all traffic cones shall be no less than 28 in in height, except that shorter cones, 12 in minimum height, may be permitted during striping maintenance operations where the only function of the cone is to protect the wet paint from the traffic.
The entire area of orange and white stripes for barricades shall be Type I, engineering grade, or Type II, super engineering grade, retro-reflective sheeting conforming to the requirements of ASTM Designation: D 4956-95.
g. Type III barricades, no less than 6 ft in length and equipped with two (2) Type “N” markers each and two (2) portable flashing beacons each, shall be used to close streets, except as otherwise specifically approved by the Engineer for minor maintenance work of no more than one (1) working day’s duration, on weekdays, or on holidays only, and limited to the hours between 8:30 a.m. and 3:30 p.m. Said barricades shall be placed across the full roadway at each point of closure with the distance between barricades, or between barricades and curbs, not exceeding 3 ft except that one (1) 10 - 12 ft-wide gap between barricades shall be provided at the center of the
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -141-
SPECIFICATIONS
street. Barricades to the right of the street’s center, facing the inbound vehicular traffic, shall also be equipped with one (1) R11-2, “Road Closed” sign, one (1) R11-4, “Road Closed to Thru Traffic,” sign, and a Type P warning sign.
h. Channelizers shall be surface mounted type and shall be furnished, placed and maintained at the locations shown on the Plans or as approved by the Engineer, and shall conform to the provisions in Section 12-3.07, “Channelizers,” of the State of California Standard Specifications, Latest Edition, and these Special Provisions.
When no longer required for the work as determined by the Engineer, channelizers (except channelizers to be left in place), and underlying adhesive used to cement the channelizer bases to the pavement, shall be removed. Removed channelizers and adhesive shall become the property of the Contractor and shall be removed from the site of work. i. Reflectorized (both sides) temporary self-adhesive markers, 4 in wide, shall be applied to unstriped pavement surface before opening the travel way to public traffic. Reflectorized temporary yellow markers shall be used for to delineate the centerline to separate opposing traffic. Reflectorized temporary white markers shall be used to delineate lanes of travel and placed in 24 in intervals transverse to the road to delineate stop bars and limit lines.
The reflectorized temporary markers shall be removed the same day the first coat of striping has been placed on the pavement. The removal of the markers shall be done such a way that the pavement is not damaged.
j. Except as otherwise approved by the Engineer, two-way vehicular traffic shall be maintained at all times within two (2) 3.3 m (11 ft) wide lanes on streets having an effective roadway width of 13.4 m (44 ft) or more with restricted parking. Other streets of lesser widths may be reduced to one (1) 3.6 m (12 ft) wide lane with work activity being limited to one side at a time, and the oneway vehicular traffic being maintained at all times by properly trained and experienced flaggers.
All lane closures shall have flashing arrow signs to provide additional, high level, advanced warning.
No reduction of the traveled way width shall be permitted on any City street before 8:30 a.m. nor after 3:30 p.m., on weekends or holidays, or when active work is not being done, unless otherwise approved by the Engineer.
k. Properly trained and experienced flaggers shall be provided to direct traffic when said traffic is to be interrupted, when two-way traffic is to be reduced to one-way traffic, and at other such times as is necessary to safely pass traffic through or around the work area and when so directed by the Engineer.
l. Vehicular access to occupied residential property may be restricted on weekdays, other than holidays, between the hours of 8:30 a.m. and 3:30 p.m. while essential work activity is taking place only upon approval by the Engineer and providing the Contractor gives the property owner
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -142-
SPECIFICATIONS
or resident at least forty-eight (48) hour advance written and oral notice.
Convenient and safe pedestrian access to schools, churches, occupied residential and business property shall be maintained at all times. Access to mailboxes shall be maintained at all times such that the postal delivery service is not interrupted. Trash pick-up services shall not be interrupted.
Access to vacant and unused property may be restricted when approved by the Engineer. Both vehicular and pedestrian access shall be maintained at all times to all other property except as otherwise specifically authorized in writing by the Engineer. m. Vehicular access to business, school and church driveways shall be maintained at all times during construction.
n. Traffic control and safety devices and equipment being used that becomes damaged, destroyed, faded, graffitied, encrusted, soiled, misplaced, worn out, inoperative, lost, or stolen shall be promptly repaired, refurbished, or replaced. Traffic control and safety devices and equipment being used, that are displaced or not in an upright position from any cause, shall be promptly returned or restored to their proper position. o. An unobstructed view of all signs and warning devices including, but not limited to, stop signs, stop ahead signs, street name signs, and other regulatory, warning and construction signs, markers, and warning devices shall be maintained at all times. All speed limit signs shall be black on white with signs at either end of the project notifying the motoring public that fines are doubled in construction zones. No trucks or other equipment or materials shall be stopped, parked, or otherwise placed so as to obscure said signs, markers and devices from the view of the vehicular and pedestrian traffic to which it applies.
p. When entering or leaving roadways carrying public traffic, the Contractor’s equipment, whether empty or loaded, shall yield to said public traffic at all times, except where the traffic is being controlled by police officers, fire officers, properly trained and experienced flaggers, or at traffic signalized intersections.
q. Stockpiling or storage of materials on any public right-of-way or parking area will not be allowed without the specific written permission of the Engineer. Materials spilled along or on said right-of-way or parking area shall be removed completely and promptly. All stockpile and storage areas shall be maintained in a safe, neat, clean, and orderly condition, and shall be restored to equal or better than original condition upon completion of the work. r. On projects involving work on, closure of, or partial closure of existing streets, and where vehicular access to the abutting property must be restricted, the work shall be so selected, arranged and scheduled that the person(s) requiring access to said abutting property and residents along said streets affected will be able to park within a reasonable distance of not more than 150m (500’) from their homes or destination. In addition, no two adjoining streets shall be closed at the same time, except as otherwise approved by the Engineer. Residents must be given written notice of such restrictions a minimum of 48 hours in advance.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -143-
SPECIFICATIONS
s. When work has been completed on a particular street or has been suspended or rescheduled, and said street is to be opened to vehicular traffic, all equipment, “NO PARKING” signs, other obstructions, and unnecessary traffic control devices and equipment shall be promptly removed from that street, except as otherwise approved by the Engineer. t. Should the Contractor be neglectful, negligent, or refuse, fail, or otherwise be unavailable to promptly, satisfactorily, and fully comply with the provisions specified and referred to herein above, the City reserves the right to correct or mitigate any situation, that in the sole opinion of the Engineer, constitutes a serious deficiency or serious case of noncompliance, by any means at its disposal at the Contractor’s or permittee’s expense, and shall deduct the cost therefore from the Contractor’s progress or final payments. Such corrective action taken by the City shall not reduce or abrogate the Contractor’s legal obligations and liability for proper traffic control and safety measures and shall not serve to transfer said obligations and liabilities from the Contractor to the City or the City’s agents.
u. Violations of any of the above Provisions or provisions of the referenced publications, unless promptly and completely corrected to the satisfaction of the Engineer, shall, at the sole discretion of the City, be grounds for termination of the Contract, or shut down or partial shutdown of the work, without compensation to the Contractor or permittee, or liability to the City, all as prescribed by contractual obligation or State law, whichever is applicable.
The Contract lump sum price paid for the traffic control system shall include full compensation for, but not limited to, furnishing all labor (including flagging costs), materials (including construction area signs), tools, equipment, traffic control Plans and revisions, and incidentals, and for doing all the work involved in placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control including lights, channelizers (surface mounted), temporary railing (Type K) markers, delineators, temporary striping and pavement marking, barricades, portable flashing beacons, flashing arrow signs, portable changeable message signs, as shown on the Plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.
Payment
Traffic control will be measured by Lump Sum as specified on the bid schedule and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work necessary as specified in the Contract Documents and Specifications, Standard Drawings, supplemental details, these Special provisions, and as directed by the Engineer or his appointed designee.
Full compensation shall be considered as included in the Contract lump sum price paid for the traffic control system and no additional compensation will be allowed therefore. Partial payment shall be based on the percentage of total value of work completed as of each progress pay estimate.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -144-
SPECIFICATIONS
3. CONSTRUCTION SURVEYING
The Contractor shall provide for the services of a land surveyor licensed in the State of California, hereinafter Surveyor, to perform all work necessary for establishing control, construction staking, records research and all other surveying work necessary to construct the work, provide surveying services as required herein and provide surveying, drafting and other professional services required to satisfy the requirements of the Land Surveyors Act. Surveyor shall be resident on the site during all surveying operations and shall personally supervise and certify the surveying work.
Contractor shall submit surveyor’s information, including license number, prior to commencing work.
Permanent Survey Markers
The Contractor shall not disturb permanent survey monuments or benchmarks without the consent of the Engineer. Where the Engineer concurs, in writing, with the Contractor that protecting an existing monument in place is impractical, the Contractor shall employ a licensed land surveyor to establish the location of the monument before it is disturbed. The Contractor shall have the monument replaced by a licensed land surveyor no later than thirty (30) days after construction at the site of the replacement is completed. The Licensed Land Surveyor shall file corner record(s) as required by '' 8772 and 8773, et seq. of the California Business and Professions Code. Copies shall be provided to the City within 10 days of replacement of any monuments.
When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, the Contractor shall adjust the monument frame and cover to the new grade. Documentation of any disturbance or relocation, horizontal or vertical shall be provided to the City.
Center Line Ties
The Contractor shall be responsible to locate centerline ties and/or monuments at locations which are part of the overlay project as directed by the Director of Public Works or his authorized representative. Contractor shall submit a scope of work for approval by the Engineer prior to commencing work. The monuments will be inventoried, tied out, and a centerline tie sheet will be prepared and submitted to the Engineer.
The Contractor shall include tie sheet preparation, setting ties, and reestablishing monuments, and the filing of a corner record as required. All ties associated with that monument as accepted by the Public Works Department and for filing by the Los Angeles County Surveyor’s office.
Contractor shall re-set the tie monuments where curb or curb ramps are removed and replaced or new ramps are installed. The Contractor’s surveyor shall be responsible to meet all requirements stipulated by the County Surveyor regarding the filing of corner records.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -145-
SPECIFICATIONS
Lines and Grades
Except when, as per orders from the Director of Public Works or his authorized representative, minor changes in the work are to be made by the Contractor, all work shall, during its progress upon completion, conform to the lines, grades, and elevations shown on the Plans. All distances and measurements are given thereon and will be made in a horizontal plane. Three (3) consecutive points shown on the same rate of slope must be used in common in order to detect any variation from a straight line, and in case any such discrepancy exists, it must be reported to the Director of Public Works or his authorized representative. Failure to make this report shall make the Contractor responsible for any such error in the finished work.
Payment
Payment for survey work shall be included in the contract price for other items of work, and no additional compensation will be allowed therefore.
4. COLD MILLING
Cold milling shall not be performed more than 2 working days ahead of paving, and streets shall not be left unpaved over a weekend or during trash pickup day unless arrangement are made with the Waste Company to ensure that trash pickup for all three containers has been completed prior to start of cold milling a particular street and that no trash trucks will need to travel over a cold milled street. Contractor shall conduct his operation in such a manner to prevent construction truck traffic from travelling over cold milled streets and newly paved streets by working on smaller streets first and larger streets last as approved by City Inspector.
Prior to cold milling activities, the Contractor shall scan the work area for any obstructions and shall perform clearing and grubbing as required. Clearing and grubbing shall be performed in accordance with the plans, of the provisions of Section 300-1, "Clearing and Grubbing," of the Standard Specifications and these Special Provisions, and shall include, but not be limited to, the following:
1. Removal and disposal of tree stumps, shrubs, ground cover, and other vegetative material.
2. Removal and disposal of decorative landscape rocks, edging, brick, pavers, railroad ties, or any other decorative landscape treatments.
3. Removal and disposal of existing AC berms, miscellaneous AC, and PCC.
4. Removal and disposal of all striping and raised pavement markers.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -146-
SPECIFICATIONS
5. The Contractor shall dispose of all materials not being salvaged outside of the right of way and shall pay for all costs of disposal. These materials include, but are not limited to, masonry walls, AC paving, PCC, and conflicting striping.
6. Stockpiling of materials within the right of way, city parking lots, or other city improved property shall not be allowed unless otherwise approved by the Engineer.
7. Removal of survey markers and monuments.
All Cold Milling operations shall conform to section 302-1 of the Standard Specification, the plans, and these special provisions. Existing AC pavement within the project limits shall be cold milled at the locations and to the dimensions and details shown on the plans or as directed by the Engineer. The final cut shall result in a uniform surface conforming to the typical cross-section.
At all locations where an overlay pavement is joining existing asphalt pavement, the Contractor shall cold mill existing pavement to provide straight, neat lines and feather the new pavement to form a smooth transition with the existing pavement. This condition is particularly required at locations where the project joins the existing pavement. At these locations, the Contractor will be required to match the existing pavement elevations. The final cap transition between the streets must be smooth and neat in appearance, including the radius points.
The City has made every reasonable effort to locate and mark on the plans all known metal roadway improvements, such as sewer manhole covers, water valve covers, and catch basin covers, which, if struck, could damage the cold milling cutting drum and/or carbide tipped cutting teeth. The City makes no guarantee that it has successfully located all said items; therefore, the contractor shall thoroughly inspect the work site in advance of the cold milling operation to minimize the risk of striking any these items.
Residue from grinding shall not be permitted to flow or travel into gutters, onto adjacent street surfaces, or parkways. All residues shall be completely removed by sweeping and properly disposed of. No washing of residue into drainage structures will be allowed. All catch basins and curb inlets shall be covered, utilizing the BMP which most appropriately fits the situation and as approved by the Engineer. The Contractor shall make every effort to control all dust created by his operations by utilizing the Best Management Practice approved by the State Water Resource Control Board.
CONTRACTOR shall provide a smooth transition for vehicles during construction at end of cold mill areas to the satisfaction of the Engineer. Temporary ramping, where required by the Engineer for traffic control or other purposes, shall be considered included in the price bid for "Traffic Control," and no additional compensation will be allowed.
Additionally, Best Management Practices will be required to protect water quality, and prevent any debris or pollutants from entering the storm drain system.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -147-
SPECIFICATIONS
All crack preparation shall be performed after cold milling, with Crafco Polyflex III or equal. Filler shall be within 1/8 inch below and flush with existing pavement surface and shall be thoroughly squeegeed, as necessary, to attain this result.
Cold milled streets shall be accepted by Engineer at least 1 day prior to street resurfacing.
Sweepers used for cold milling shall not enter on streets approved as clean after cold milling. The CONTRACTOR shall provide a minimum of two vacuum-brush type sweepers at all times during cold milling. Due to the presence of Oil Macadam pavement, the contractor shall provide Water trucks during the cold milling operation to keep dust to a minimum.
Cold Milling Operation will be monitored closely to ensure that the base/subbase is not disturbed. If the contractor encounters base/subbase, he shall immediately notify the City. If approved by the City inspector, the contractor shall reduce the cold milling depth for that reach of the street. The City inspector shall approve the modified operation.
All materials indicated to be removed shall be recycled per the requirements highlighted in Section 7-15 of these Specifications.
Payment
Payment for cold milling shall be shall be included in the contract price for the asphalt concrete item of work (Bid Item #6), and no additional compensation will be allowed therefore.
5. AC LEVELING COURSE
The work shall consist of installing asphalt concrete Caltrans HMA Type A (1-inch Max.
Aggregate), conforming to the Tables of Section 39-2.02B(4)(b) of Caltrans Standard Specifications 2024. Crushed particles shall be at 90% minimum for coarse aggregate, and 70% minimum for fine aggregates. Use PG 64-16 binder in conformance with specifications. The Contractor shall submit for approval to the City Engineer a signed and verified Job Mix Formula (JMF) on the manufacturer’s format and on Caltrans Form CEM 3513, fifteen (15) days prior to the beginning of the work.
Placing
Prior to placing base, the existing subgrade shall be cut/removed, scarified, and regraded to receive Class II Base, which will underlie the proposed AC base/leveling course. Existing subgrade shall be recompacted to 95%, and the Class II base layer shall also be compacted to 95%.
Lift thickness for base/leveling course is 6 inches. Contractor may apply up to two (2) lifts for base/leveling course, contingent on the daily workload capacity and/or other limiting factors.
Contractor shall ensure tack coat is provided if base/leveling course if constructed in two lifts.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -148-
SPECIFICATIONS
Tack coat in-between layers/lifts shall be SS-1h. The tack coat shall be applied at 0.12 gal/sy for non-diluted tack coat. If supplied dilutes the tack coat, apply tack coat at 0.20 gal/sy. Use caution when applying tack coat(s) at concentrations greater than 0.15 to avoid puddling and runoff.
The Contractor shall place asphalt concrete with a self-propelled asphalt paving machine.
Contractor shall provide a 20-foot-long automatic screed control on both sides of the paving machine for all paving with paving machine, as directed by Engineer.
Each paving machine used will require a paving foreman for each machine along with a full set of rollers as specified and two rakers and one shoveler laborer as a minimum.
Non-uniform surface voids or scraped rock surfaces on the surface of the mat behind the screed will be considered indication of aggregate particle conflicts between screed and existing grade, resulting in cessation of paving until adjustment of thickness to provide for a smooth surface is provided to the satisfaction of the Engineer.
Rolling along a joint shall be such that the widest part of the roller is on the hot side of the joint.
Rubber tire rollers shall be used on any leveling course.
Join lines between successive runs shall be prepared on the unconfined end using butt joint, milled or cutback joint, or notched wedge joint.
Compaction
Rolling shall include 3 phases:
1. One pass with a steel wheeled 2-axle tandem vibratory roller weighing between 10 tons and 12 tons with wheels whose diameter shall measure a minimum of 40 inches.
2. Two passes with a pneumatic-tired roller weighing not less than 12 tons.
3. An 8 to 10-ton roller shall perform finish rolling.
Payment
Payment for AC base/leveling course shall be shall be included in the contract price for the asphalt concrete item of work (Bid Item #6), and no additional compensation will be allowed therefore.
6. ASPHALT RUBBER HOT MIX (ARHM)
ARHM Material shall conform to 203-11 of the GREENBOOK as modified herein and section 39 of Caltrans Standard Specifications 2024. ARHM gradation shall be GG-C. The Contractor shall submit for approval to the City Engineer a Caltrans signed and verified Job Mix Formula (JMF) on Caltrans Form CEM 3513, 15 days prior to the beginning of work.
ARHM Construction shall conform to 302-9 of the GREENBOOOK as modified herein.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -149-
SPECIFICATIONS
203-11 ASPHALT-RUBBER HOT MIX (ARHM) WET PROCESS.
203-11.2 Materials.
203-11.2.3 Crumb Rubber Modifier (CRM).
The third and the last sentence of the first paragraph of Subsection 203-11.2.3 are hereby deleted and replaced with the following:
The high natural rubber shall be a single source material and not a blend of more than one source.
The high natural CRM shall not be tire rubber. A minimum 2-ounce unground and ungranulated sample of the base stock shall be provided, along with a minimum 4-ounce ground or granulated sample. Contractor shall pay for any failed chemical analysis tests.
The fifth paragraph of Subsection 203-11.2.3 is hereby deleted and replaced with the following:
The percentage of high natural CRM shall be equal to 1000 divided by the percentage of natural rubber in the high natural CRM (using whole number percentages), e.g., 1000/40 percent equals 25 percent. The remainder of CRM shall be scrap tires.
The maximum value for Natural Rubber Content in Table 203-11.2.3(B) is hereby deleted.
The sixth (last) paragraph of Subsection 203-11.2.3 is hereby deleted. 203-11.2.4 Aggregate. The text of Subsection 203-11.2.4 is hereby deleted and replaced with the following:
The aggregate for ARHM shall conform to the “quality requirements” for asphalt concrete Type A as specified in Caltrans Standard Specifications, except for the following:
Maximum LA Rattler value at 500 revolutions shall be 35.
Eighty-five percent of coarse aggregate shapes shall be “proportioned particles”, a proportioned particle being defined as a particle having a minimum dimension greater than ½ the maximum dimension as measured with a caliper. The percentage of proportioned particles shall be tested by California Test 205 with the words “proportioned particles” substituted for “crushed particles”.
California Test 205, Section D, definition of a crushed particle hereby revised as follows: "A particle having 2 or more fresh mechanically fractured faces shall be considered a crushed particle".
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -150-
SPECIFICATIONS
Composition and Grading.
The aggregate for Asphalt-Rubber Hot Mix (ARHM-GG) shall conform to following gradations, which shall be considered included as additional column in Table 203-11.3 of the SSPWC, or 39-
2.03B(4)(b) of the Caltrans Standard Specifications 2024:
1/2-inch RHMA-G (ARHM GG-C)
Sieve Sizes Target Limits Allowable
tolerance
3/4” 100 --
1/2” 90-98 ± 6
3/8” 83-87 ± 5
No. 4 28-42 ± 6
No. 8 14-22 ± 5
No. 200 0-6.0 ± 2
No mineral filler or material from sand or rock dust bins shall be included in the mix.
Except for the No. 200 sieve, it is the intent of the Specifications that the target percentage be the central value in the Contract Compliance Range.
The asterisk noted under Table 203-11.3(A) is hereby deleted and replaced with the following:
Once the percent asphalt-rubber binder is determined by the mix design, the tolerance shall be +/-0.5% as determined by California Test Method 382, and this tolerance shall be considered to include all sampling and testing tolerances. Variations of binder content on this basis at or exceeding +/- 0.5% from the mix design will be cause to terminate paving operations until changes to provide specified tolerances are verified and approved by the Engineer.
Any change in source of aggregate supply requires 2 weeks advance notice in writing to the Engineer, and submittals and testing in conformance with specifications for a new mix design.
No single bin shall receive aggregate from more than one source. Contractor shall provide a copy of aggregate delivery tickets for aggregate delivered for use on the project.
The amount of asphalt-rubber binder to be mixed with the aggregate for Asphalt-Rubber Hot Mix Type GG will be determined by the Engineer using the samples of aggregates furnished by the Contractor in conformance with the provisions in Section 39-3.03, "Proportioning," of the Standard Specifications. The Engineer will determine the exact amount of asphalt-rubber binder to be mixed with the aggregate in conformance with the provisions in California Test 368 with the following exceptions. The aggregate shall be mixed with PG 64-16 paving asphalt and the optimum bitumen content shall be determined in conformance with the test procedure. The
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -151-
SPECIFICATIONS
optimum binder content for Asphalt-Rubber Hot Mix Type GG shall then be determined using the following formula:
A. OBC2 = (OBC1) x 1.20
B. OBC1 = Optimum bitumen content using PG 64-16 paving asphalt C. OBC2 = Optimum bitumen content using asphalt-rubber binder The asphalt-rubber binder content of the Asphalt-Rubber Hot Mix Type GG will be determined by California Test Method 382.
203-11.4 Mixing.
The third paragraph of Subsection 203-11.4 is hereby deleted and replaced with the following:
The proportions of the materials, by total weight of asphalt-rubber binder, shall be 79 percent ± 1 percent combined paving asphalt and asphalt modifier, and 21 percent ± 1 percent CRM.
However, the minimum amount of CRM shall not be less than 20 percent. Lower values shall not be rounded up. The temperature of the blended asphalt and modifier shall be between 190 degrees C (375 Fahrenheit) minimum and 226 degrees C (440 Fahrenheit) maximum when the CRM is added. The temperature shall not exceed 6 degrees C (10 Fahrenheit) below the actual flash point of the mixture. The CRM shall be combined and mixed together in an asphalt-rubber mechanical blender meeting the requirements of 203-11.5. The combined asphalt and CRM shall be pumped into a reaction tank or distributor truck meeting the requirements of 203-11.5, Item 3A). The required mixing/reaction time shall be 90 minutes minimum. The temperature of the asphalt-rubber mixture shall be between 194 degrees C (380° Fahrenheit) minimum to 218 degrees C (425 Fahrenheit) maximum during the reaction period.
After reacting, the asphalt-rubber binder shall conform to the requirements in Table 203-11.4(A).
The minimum reaction period shall be the time from complete incorporation of materials into the mix to the time that the asphalt-rubber meets all specifications for reacted material, but no less than 90 minutes. Once established, the minimum reaction period shall remain unchanged, unless there are changes in materials or equipment that may affect rubber digestion, in which case a new reaction period shall be established per specifications. The Engineer’s decision shall be final for determination of the minimum reaction period.
All material shall be tested for viscosity and verified as to complete reaction prior to transfer to any storage tank or use of the reaction tank for feet to the hot mix plant. Material reacted lower than specified temperature, but above 185 degrees C (365 F), or transferred to a storage tank prior to completion of reaction as specified, shall be reacted for total period of 3 hours prior to use. Any such transfer shall be described in the comments column of the Asphalt-Rubber Batch Log.
Inability to maintain reaction temperatures above specified minimums will be cause to terminate paving operations. Contractor is reminded that if the reaction tank does not have a gas retort
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -152-
SPECIFICATIONS
heating system capable of raising the temperature of its contents at least 20 degrees per hour, there exists the inherent potential for such below minimum temperatures to become an irreversible condition. Certification was previously provided at time of bid opening in the bid that the asphalt-rubber hot mix plant owner, the paving subcontractor, and asphalt-rubber supplier have been made fully aware of these provisions.
Contractor shall test viscosity and record the following information for every tank of asphaltrubber prior to being transferred to storage or directed to feed to the hot mix plant:
1) Temperature of stored asphalt cement material at time of loading 2) Time at which the reaction tank is fully loaded
3) Tons of asphalt-rubber added to the tank for the batch 4) Total asphalt-rubber in the tank after loading
5) The beginning time of reaction (Fully loaded and above 380° F) 6) Binder temperature at time of sampling
7) Temperature of tested material
8) Viscosity reading
9) Time of viscosity test (All test results must be prior to use.) If more than 20% of a batch is holdover material, the reaction time may be reduced, but a line item must be provided on the Asphalt-Rubber Batch Log showing items 6), 7) and 8) for a test just prior to loading new material. Reaction shall be considered to begin after all material is added. If more than 20% is holdover material, reaction time can be reduced to the fraction of total material that is holdover material, times 90 minutes, but shall be no less than 20 minutes.
A copy of the Asphalt-Rubber Batch Log shall be provided to the Engineer upon request. A copy of the batch log sheet and all circle charts for the day shall be faxed to the City within 1 1/2 hours of ending production of ARHM for the day. To fit 8 ½ x 11-inch sheets, the circle chart may be faxed in 2 parts with an overlap. See Subsection 203-11.5 for circle chart requirements.
The Maximum value for Haake Field Viscosity @191 degrees C (375 degrees Fahrenheit) in Table 203-11.4(A) is hereby changed to 2400 Centipoise.
The first fully reacted passing sample on each batch, prior to transfer to storage or converting to feed to the ARHM mix plant shall be poured into a clean gallon can that has been pre-certified by the Engineer. It shall be the responsibility of the contractor to ensure that sufficient sample cans with lids are at the plant, such that the can be pre-certified at least three days prior to use. If the Engineer is not at the plant at start up, the Engineer will provide certified labels, which are prenumbered and signed by Engineer to be affixed to the cans as they are consecutively used by number.
The Contractor shall conduct sampling such that the pre-certified sample can numbers correspond to the batch numbers beginning with one at the start of the project, increasing consecutively with each batch, without restarting the count at any point. After testing and
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -153-
SPECIFICATIONS
recording the information for the batch, the corresponding pre-certified sample can shall be filled and stored for the duration of the project or until the Engineer takes possession of the can. 203-11.4.1 The second and third sentences of Item Number 3 under Test Procedure is hereby deleted and replaced with the following:
In one continuous operation, turn off the spindle rotation, remove the spindle vertically from the binder (after heating), discontinue stirring the binder and immediately insert the spindle back into the center of the binder to full immersion and wait 5 seconds. While holding the viscometer level, turn the spindle on and watch the needle on the viscometer dial and record the maximum value obtained on the dial.
Equipment for production of Asphalt-Rubber.
Add the following to Item 3) of 203-11.5:
A) Reaction Tank. The asphalt-rubber material shall be held in a reaction tank separate from the storage tank feeding the ARHM plant, until the reaction is complete. The reaction tank shall have agitation sufficient to increase the viscosity of the mixture to a peak viscosity reading at least 20 percent higher than the viscosity reading of the material measured at a time that the material otherwise meets specifications for reacted material.
The time of reaction may be extended as needed to produce this result. It shall be the responsibility of the Contractor to demonstrate to the Engineer through viscosity readings at appropriate times that the equipment conforms to these requirements. If this cannot be demonstrated, the reaction time shall be 3 hours. Once established, the reaction time shall be the minimum time for reaction unless there are changes in materials or equipment, in which case a new reaction time shall be established per specifications. The Engineer's decision shall be final.
The reaction tank shall have a functioning paper circle chart thermometer device, which shall record tank temperatures whenever asphalt-rubber is in any stage of production.
Seven days before production of asphalt-rubber starts, the Contractor shall provide the Engineer approximately double the number of charts estimated to be needed to produce the necessary binder quantity. These charts will be numbered and signed by the Engineer and returned to the Contractor prior to start of production. These signed and numbered charts shall be used throughout production of the asphalt-rubber binder. Charts shall be used in the consecutive order as numbered by the Engineer beginning with number one, and shall be returned weekly after use to the Engineer. Charts will be identified with the date they were used by the Contractor at time of installing on the equipment, and shall be identified as to the tank to which they were attached. Production of asphalt-rubber shall be terminated if this procedure is not followed and will not be restarted until Contractor demonstrates to the Engineer that it is capable of complying with this requirement.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -154-
SPECIFICATIONS
At the start of each production day, the paper chart shall be replaced with a new signed, dated and numbered sheet, the lead scribe shall be sharpened or ink well filled, and the circle chart shall be calibrated against a sample of material drawn early from the first batch of the day. Any calibration adjustments shall be recorded in the appropriate space provided on the batch log sheet. A spare functional circle chart device shall be at the plant at all times for immediate installation should failure occur on a circle chart device being used. Calibration shall be performed as part of such installation. The lack of a functional circle chart device on the reaction tank shall be cause to terminate production of asphalt-rubber binder. A blunt lead scribe or low ink, or a paper chart used on a prior day will be considered to render the device non-functional.
B) Storage Tank. After a complete reaction is verified by viscosity readings acceptable to the Engineer, the material shall be held in a storage tank that is fully isolated from material that is not fully reacted. This tank shall be the only tank feeding the ARHM plant. No material shall be transferred to the storage tank feeding the plant until reaction is complete in the reaction tank.
APPLICATION
ARHM-GG construction on system 3 streets shall be performed on a different day than on intersections that are not contiguous with a system 3 street, without written authorization from the Engineer. Non-conformance with this requirement will be cause to pay for tonnage of pavement in all areas on that day at the lowest of the two tonnage prices.
ARHM-GG shall be complete in all areas prior to slurry.
Tack coat for overlay shall be SS-1h. The tack coat shall be applied at 0.12 gal/sy for non-diluted tack coat. If supplied dilutes the tack coat, apply tack coat at 0.20 gal/sy. Use caution when applying tack coat(s) at concentrations greater than 0.15 to avoid puddling and runoff.
All PCC surfaces, to be crossed by trucks used to haul ARHM, that are within 500 feet of the work limits shall be covered with sand or other durable covering prior to applying tack coat.
Contractor shall have sufficient power brooms on site during all periods of distribution and spreading to provide for cleanup of haul routes and work areas. Power broom shall provide miscellaneous cleanup of ARHM spoils as directed by the Engineer.
Mixing Binder with Aggregate
For drum plants, the system shall run fully automatic with the only input to the AC plant computer being information transmitted automatically from a Corealis mass flow meter on the line of the asphalt-rubber feed to the AC plant. All automatic shutdown features of the AC plant shall be fully functional.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -155-
SPECIFICATIONS
Distribution and Spreading
The ambient temperature shall not exceed 105° F at time of placing ARHM.
The temperature of ARHM shall be minimum 290 degrees Fahrenheit directly behind the paving machine and high enough upon delivery that pavement temperature after two passes with the breakdown roller exceeds 240 degrees Fahrenheit.
To avoid picking up loose rock in the overlay area, the tires of all trucks must be lightly oiled with linseed oil or soy bean oil or approved equal. Diesel fuel will not be allowed on the project at all for oil down of any equipment.
Raking of ARHM shall be eliminated as much as possible. ARHM material shall not be cast across the mat under any circumstance. Raking shall be just enough to set up edges for uniform joins without casting material. Screed controls shall be the predominant means of controlling material at joins. In areas where paving machines cannot be used due to space constraints, material shall not be thrown by shovels. Material shall be removed directly from the paving machine hopper and shall be placed directly in its final location, to be distributed with minimal raking. Material may be dumped directly from a truck, but further material distribution shall be by shovel directly to its final location with minimal raking. A small rubber tire tractor with a screed type attachment may be used to spread a pile dumped from a truck, but raking shall be minimized after spreading.
The paving machine screed shall not be pulled across an area already paved with ARHM, even adjacent to narrow areas to be paved. Such narrow areas shall have ARHM distributed by methods specified by shovel or rubber tire tractor, unless the adjacent area has hardened enough and will not be significantly marred by passing the screed over it. Even if hardened adequately, Contractor shall spread rock dust by hand tools to avoid cohesion of the ARHM in the screed to the existing surface of such areas of freshly cured ARHM.
Contractor shall maintain a functioning infrared heat measurement device in close proximity to each paving machine at all times. Contractor shall provide a pavement temperature reading, with an infrared heat measurement instrument, when requested by the Engineer. Inaccessibility of a heat measurement shall be cause for termination of paving operations.
Transverse cold joints shall be provided such that longitudinal joints are not left exposed at the end of the workday.
Contractor shall provide 20 foot long automatic screed control on both sides of the paving machine for all paving with paving machine, as directed by Engineer.
Rolling
Rolling along a joint shall be such that the widest part of the roller is on the hot side of the joint.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -156-
SPECIFICATIONS
Join lines between successive runs shall be prepared on the unconfined end using butt joint, milled or cutback joint, or notched wedge joint.
Initial breakdown rolling shall be static. Breakdown roller shall make two passes over all areas.
A pass shall mean one passage of the roller over an area.
An intermediate roller of the same or greater width than the breakdown roller shall be rolling directly behind the breakdown roller at all times, and paving shall cease if intermediate rolling is terminated for any reason. Additional intermediate rollers may be necessary depending on production rates. Intermediate roller shall make 2 passes unless otherwise directed or approved by the Engineer.
The rolling pattern shall be approved by the Engineer and once established, the rolling pattern shall remain consistent, unless conditions change and a modified rolling pattern is needed to conform to specification. Engineer shall be notified immediately on change of rolling pattern.
All finish rolling shall be performed by a separate finish roller.
To ensure optimum quality control, the use of more than one paver must be approved in advance by the Engineer, and will generally require one foreman, one sweeper, and a full complement of rollers per Subsection 302-5 of the Standard Specifications and this Subsection 302-9.5 for each paving machine.
An extra breakdown roller shall be on site at all times, free of defects.
A finish roller shall be provided in addition to intermediate rolling to perform all finish rolling, such that the intermediate roller can stay immediately behind the breakdown roller at all times.
The second sentence of Subsection 302-9.6 is hereby deleted and replaced with the following:
Rock dust blotter shall be washed concrete sand per Fine Aggregate in Section 90, spread at rate of 2 to 3 pounds per square yard as necessary to maintain traffic at the direction of the Engineer. Excess sand spread on adjoining areas to receive ARHM-GG shall be thoroughly swept before spreading any binder.
Warranty
The Contractor shall warranty the materials and workmanship of the Asphalt-Rubber Hot Mix - Gap Graded (ARHM-GG), for a period of 365 days, and shall repair defects identified during the warranty period, in conformance with these special provisions. The warranty period shall start upon acceptance of the pavement.
During the warranty period, should an area of ARHM-GG be found to be defective, the Engineer will notify the Contractor in writing of the areas to be repaired. The Contractor shall complete
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -157-
SPECIFICATIONS
the repairs within 30 days from the date of the notification letter, unless the Engineer determines that weather conditions are unsuitable, in conformance with the provisions in Section 8-1.06, "Time of Completion," of the Standard Specifications, for completing the repair work, in which case the Engineer will allow additional time for completion of the repairs.
The Engineer shall decide all questions which arise as to the performance of the ARHM-GG during the warranty period and as to the acceptable fulfillment of the warranty, in conformance with the provisions in Section 5-1.01, "Authority of the Engineer," of the Standard Specifications.
Construction area signs, shown on the plans, shall be removed upon completion of the contract item work, except for work required by the warranty. During the warranty period, the Contractor shall place and maintain signs in conformance with Section 12-3, "Traffic-Handling Equipment and Devices," of the Standard Specifications and these special provisions. Signs shall be, at the Contractor's option, either stationary mounted or portable signs conforming to the provisions in "Construction Area Signs" of these special provisions.
At least 7 days prior to beginning placement of the leveling course under the ARHM- GG, the Contractor shall submit to the Engineer a written list of existing defective areas, identifying the lane direction, lane number, starting and ending highway post locations and defect type. Within 7 working days of receiving the list of existing defective areas, the Engineer will review the list and provide the Contractor written approval or revisions of the areas, as being excluded from the warranty.
Alligator pavement shall mean areas of pavement surrounded by cracks on the full perimeter where the maximum dimension of the area within the perimeter is less than 10 inches, and such areas are multiple and clustered together contiguous to each other. Defects in the existing surfacing which may qualify areas for exclusion from the warranty include: Rutting greater than 9mm in combination with flushing of surface pavement as flushing as defined herein in more than 10% of the rutted area; rutting greater than 0.25 in combination with alligator cracking in more that 15% of the rutted area; patches of cold mixed asphalt concrete placed within the last 12 months. Rutting that shall be excluded from the warranty is defined as a longitudinal depression in the wheel path that, when measured by placing a straightedge on the finished surface and perpendicular with the center line, varies more than 0.25 from the lower edge of the straightedge, in combination with alligator cracking or flushing in the percentages described above. Segments of the project excluded from warranty for rutting or cracking shall be warranted for the other criteria. Segments repaired by the Contractor shall be warranted for all criteria.
Placement of the Asphalt-Rubber Hot Mix (Type GG) shall not begin until the Engineer has approved the list of existing defective areas, and repairs included in the contract have been made. The Asphalt-Rubber Hot Mix (Type GG) placed over areas shown on the plans or designated by the Engineer to be repaired shall be warranted.
When it is anticipated that there will be a suspension of work of more than 120 days, the Contractor may request in writing that a separate warranty period be established for the portion of ARHM- GG already completed. If the Engineer determines that the designated portion of
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -158-
SPECIFICATIONS
ARHM- GG work has been completed in conformance with the requirements of the contract, the Engineer will recommend that the Director relieve the Contractor of the duty of maintaining and protecting the designated portion of ARHM- GG work in conformance with the provisions in Section 7-1.15, "Relief from Maintenance and Responsibility," of the Standard Specifications, except for work required by the warranty, and the Engineer will notify the Contractor in writing of the date of the start of the separate warranty period and the date on which the separate warranty period will be complete. The relief from maintenance and responsibility shall apply to the designated portion of ARHM- GG only, and does not constitute completion of a contract item of work. Upon completion of the separate warranty period, no further work will be required on the designated portion of ARHM- GG. No separate interim estimate will be prepared for the designated portion of ARHM- GG. No more than one separate warranty period will be allowed during the contract.
The following criteria for identifying defective material placed by the Contractor shall apply to the ARHM-GG during the warranty period:
A. Rutting consists of a longitudinal surface depression in the wheel path which is, when measured by placing a straight edge on the finished surface and perpendicular with the center line varies more than 0.5 inch from the lower edge of the straightedge for a 50-ft length.
B. Raveling consists of the separation of the aggregate from the binder.
C. Flushing consists of the occurrence of a film of bituminous material on the surface of the ARHM-GG which results in a coefficient of friction of less than 0.30, determined in conformance with the requirements in California Test 342.
D. Delamination consists of the loss of the bond between the layers of pavement.
E. Pot holes consist of the loss of ARHM-GG material.
Lengths of each lane with rutting in the ARHM-GG shall have the 50-ft length area repaired. Areas in the ARHM- GG, of raveling, flushing or delamination, and pot holes shall be considered defective and shall be repaired.
Areas of rutting, raveling, flushing and delamination to be repaired shall be removed to 1-inch minimum depth of the ARHM- GG, by cold milling in conformance with these special provisions, for the full lane width and the length of the area determined to be defective, plus 5-ft on each end measured along the lane line. The area planed shall then be repaired by placing ARHM- GG in conformance with the provisions in "ARHM- GG" of these special provisions, produced by the same plant and aggregate source as original ARHM-GG.
If the area between 2 consecutive repairs, except repairs of pot holes is less than 10-ft in length, measured along the lane line, that area shall also be repaired.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -159-
SPECIFICATIONS
Areas of rutting, raveling, flushing, delamination, or pot holes which create a condition hazardous to traffic shall be temporarily patched by placing a layer of commercial quality paving grade asphalt concrete over the defective area, or filling pot holes with that material, to provide a temporary traveling surface, or shall be repaired as specified above.
The Contractor shall begin placing temporary patches within 2 days after notification of the condition by the Engineer and shall complete the work within 3 days of that notification.
Upon 3 days after notification of the Contractor, the Engineer may make or cause to be made the needed temporary patches and provide a detailed billing to the Contractor for the work.
The Contractor shall reimburse the City for the work within 60 days of receipt of the billing, or the costs may be deducted from any moneys due or to become due the Contractor under the contract. If the total area of temporary patching placed or to be placed exceeds 5 percent of any 100-ft length of a lane or shoulder, the entire lane or shoulder for that 100-ft length shall be repaired as specified above, and the temporary patches previously placed in that 100-ft length shall be removed prior to placing the repair.
Temporary patches shall be removed and a repair placed within 20 days after expiration of the warranty period. If the Engineer determines that a temporary patch provides an acceptable traveling surface, the patch may remain in place.
As an alternative to the materials and methods specified above for repairs and temporary patches, the Contractor may use other materials or methods which will provide performance equal to or better than the ARHM- GG placed in conformance with the provisions in "ARHM-GG" of these special provisions, if the alternative materials and methods are approved in writing by the Engineer, except no alternative to removing the full depth of the ARHM- GG specified herein will be allowed for areas of flushing.
Should the Contractor fail or refuse to comply with the requirements of the warranty, the Engineer may make or cause to be made the needed repair work and provide a detailed billing to the Contractor for the work. The Contractor will be charged the cost for the work. This charge will be deducted from any payments due or to become due the Contractor.
Temporary patches and repairs made or caused to be made by the State, due to the Contractor’s failure to comply with the requirements of the warranty, shall not void the warranty of the ARHM-GG. The Contractor shall continue to warranty the ARHM- GG, including areas patched or repaired by the Contractor or by the State, for the remainder of the warranty period.
Warranty will be paid for on a lump sum basis. The contract lump sum price paid for warranty shall include full compensation for providing a warranty for Asphalt-Rubber Hot Mix (Type GG) and for furnishing labor, materials, tools, equipment, and incidentals, and doing the work involved in repairing defective areas in the Asphalt-Rubber Hot Mix (Type GG), including job site inspection, placement and removal of temporary patches, cold planning, repair of defective
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -160-
SPECIFICATIONS
areas, sealing cracks and replacement of traffic stripes, pavement markings and pavement markers obliterated by patches and repairs, as shown on the plans or described in the specifications, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer. Payment for the warranty item will be made in 10 equal payments.
The first payment will be made on the third progress payment date after the warranty period begins, and subsequent payments will be made monthly thereafter. Retention payment for the remainder of the work will be made under normal procedures and within normal timeframes; the payment for Warranty will be independent of other payments including retention. Ten percent retention for any Warranty work actually performed based on estimate of cost by the Engineer will be withheld until 35 days after the Warranty period has expired.
Full compensation for furnishing construction area signs required for the direction of public traffic through or around the work during the warranty period and for erecting or placing, maintaining (including covering and uncovering as needed) and, when no longer required, removing construction area signs at locations shown on the plans, during the warranty period, shall be considered as included in the cost for warranty and no separate payment will be made therefore.
The work shall consist of installing ARHM-GG conforming to Section 39 of Caltrans Standard Specifications 2024. Use PG 64-16 binder in conformance with specifications. The Contractor shall submit for approval to the City Engineer a Caltrans signed and verified Job Mix Formula (JMF) on Caltrans Form CEM 3513, 15 days prior to the beginning of the work.
Placing
All holes and cracks exceeding 2 inches deep by 5 inches wide by 7 inches long in all 3 dimensions shall be filled with asphalt concrete approved for skin patch compacted level with the top of the existing pavement. All cracks and joints 1/4 inch or greater in width shall be blown thoroughly clear with high pressure air or power broom clean to a depth of 3/4-inch min. prior to final sweeping just ahead of leveling course.
Tack coat for overlay shall be SS-1h. The tack coat shall be applied at 0.12 gal/sy for non-diluted tack coat. If supplied dilutes the tack coat, apply tack coat at 0.20 gal/sy. Use caution when applying tack coat(s) at concentrations greater than 0.15 to avoid puddling and runoff.
The Contractor shall place asphalt concrete with a self-propelled asphalt paving machine.
Contractor shall provide a 20 foot long automatic screed control on both sides of the paving machine for all paving with paving machine, as directed by Engineer.
Each paving machine used will require a paving foreman for each machine along with a full set of rollers as specified and two rakers and one shoveler laborer as a minimum.
Asphalt concrete shall be placed at a minimum thickness of ¾-inch. Non-uniform surface voids or scraped rock surfaces on the surface of the mat behind the screed will be considered indication
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -161-
SPECIFICATIONS
of aggregate particle conflicts between screed and existing grade, resulting in cessation of paving until adjustment of thickness to provide for a smooth surface is provided to the satisfaction of the Engineer.
Rolling along a joint shall be such that the widest part of the roller is on the hot side of the joint.
Rubber tire rollers shall be used on any leveling course.
Join lines between successive runs shall be prepared on the unconfined end using butt joint, milled or cutback joint, or notched wedge joint.
Compaction
Compaction/Rolling shall include 3 phases:
1. One pass with a steel wheeled 2-axle tandem vibratory roller weighing between 10 tons and 12 tons with wheels whose diameter shall measure a minimum of 40 inches.
2. Two passes with a pneumatic-tired roller weighing not less than 12 tons.
3. An 8 to 10-ton roller shall perform finish rolling.
Payment
Payment for ARHM-GG shall be included in the contract price for the asphalt concrete item of work (Bid Item #6), and no additional compensation will be allowed therefore
7. CONCRETE IMPROVEMENTS
Concrete Removal
Saw-cutting and removal of concrete as shown on the Plans and as quantified by the Bid Schedule shall conform to Subsection 401-3.2 of the Standard Specifications for Public Works Construction.
Sawcutting shall be accomplished by the use of a power-driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. A clean sawcut edge shall be maintained until new concrete sidewalk is constructed. Generally, sawcuts shall be on existing joints or score mark.
All necessary sawcutting of existing concrete shall be to the lines shown on Plans and as directed in the field by the Engineer. Sawcutting shall be included in the unit price and no further compensation shall be made.
Concrete removal work shall also include incidental work such as root clearing in order to bring new concrete to final finish grade.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -162-
SPECIFICATIONS
Potholing
Contractor shall pothole within the vicinity of the proposed ramps to determine the location of utility lines, boxes, valves, etc. which are to be relocated or adjusted in depth to accommodate the proposed improvements.
Detectable Warning Surface Pads
Detectable warning surface pads shall consist of surface-applied detectable warning surface panels manufactured with a matte finish exterior grade homogeneous (uniform color throughout thickness of product) glass and carbon reinforced polyester-based Sheet Molding Compound (SMC) composite material. Truncated domes shall contain fiberglass reinforcement within the truncated dome for superior structural integrity and impact resistance. A matte finish will be required on the Tactile Warning Surface for superior slip resistance performance superior to that offered by a gloss finish.
Color shall be Federal Yellow (Y), Federal Standard Color No. 33538.
Portland Cement Concrete (PCC) shall meet the requirements of Section 201, “Concrete, Mortar, and Related Materials,” Subsection 302-6, “Portland Cement Concrete Pavement,” and Section 303, “Concrete and Masonry Construction,” of the Standard Specifications and these Special Provisions:
New Concrete
Add to Subsection 201-1.1.1, "General", of the Standard Specifications the following:
The Contractor shall furnish the Engineer in the field with a copy of the mix design to be used, and with a legible certified weighmasters certificate for each load of PCC delivered to the project.
PCC delivered to the project site having a water content and/or slump greater than that specified in the mix design shall be rejected and removed from the project site.
Revise the table in Subsection 201-1.1.2, "Concrete Specified by Class and Alternate Class," of the Standard Specifications as follows:
Except as otherwise specified, all PCC used on this project shall be Class 560-C-3250 with a maximum slump of 4 in for all PCC and with the exact mix proportions being determined by the Contractor except for trench backfill slurry, air-placed Concrete-Method B, traffic signal footing, slough wall footing, retaining wall and as specified by the Engineer.
Replace the first sentence in Paragraph 6, Subsection 201-1.4.3, "Transit Mixers," of the Standard Specifications with the followings:
The total elapsed time between addition of water at the batch plant and the completion of the discharge of the PCC from the mixer shall not exceed ninety (90) minutes or before 250
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -163-
SPECIFICATIONS
revolutions of the drum, whichever occurs first. All PCC remaining in the mixer after said ninety (90) minutes time limit shall be rejected and removed from the project site. When the temperature of the PCC is 30 C (86 F) or greater or any conditions contributing to quick stiffening of the PCC, it shall be removed from the project site.
General
Replace the last paragraph, Subsection 303-5.1.1, "General," of the Standard Specifications with the following:
When removals of curb and/or sidewalk are located at curb return, the Contractor shall install access ramps with cast in place American Disability Act (ADA)/ California Code of Regulations (CCR) Title 24 – Accessibility Regulations approved detectable warning panels (truncated domes).
The Contractor is to construct all sidewalks, access ramps, and gutters in accordance with ADA Standards/CCR Title 24 – Accessibility Regulations. If the sidewalks, access ramps, and gutters constructed by the Contractor are found to be in non-compliance with ADA Standards/CCR Title 24 – Accessibility Regulations, the Contractor will be required to remove and replace the sidewalks, access ramps, and gutters to ADA Standards/CCR Title 24 – Accessibility Regulations at the Contractor's expense.
All removed curb and gutter, cross gutters, spandrels, driveway approaches, and sidewalks shall be replaced within three (3) calendar days, unless the contractor provides reasonable documentation to exceed the three (3) day limit five (5) working days before removal and approved in writing by the Engineer. The Asphalt Concrete patch shall be placed within five (5) working days after the curb and gutters are replaced, and seven (7) days after the cross gutter and spandrels are replaced.
No PCC shall be ordered and/or placed until the forms and subgrade have been inspected and approved by the Engineer in the field.
All traffic signal pull boxes, water meter boxes, water valve covers, street light boxes, and other utility boxes shall be adjusted to proposed finish grade and approved by the Engineer in the field prior to placement of the PCC.
Integral color PCC placed for sidewalk construction shall be continuous pours from the same daily batch. No cold joint between daily pours of PCC will be allowed.
Add to the first paragraph of Subsection 303-5.1.2, "Drainage Outlets through Curb," of the Standard Specifications the following:
Coring shall be required for all drains through existing curbs.
Replace the last paragraph of Subsection 303-5.1.3, "Driveway Entrances," of the Standard Specifications with the following:
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -164-
SPECIFICATIONS
Driveway approaches including walk is to be considered across driveways to commercial establishments, the thickness thereof shall be 6 inches unless otherwise specified or shown on the plans. At Residential driveways, the thickness of the walk will be 6 inches unless otherwise specified or shown on the plans.
Add to Subsection 303-5.3, “Placing Concrete,” of the Standard Specifications the following All temporary storage of PCC liquid residues and mixer wash out on the project site shall be deposited within a self-containment area or bin. The Contractor may elect to allow the moisture to evaporate and dispose of the material as a solid or dispose of the material as a liquid. The Contractor shall notify the engineer in writing, as a preconstruction meeting submittal, what method of disposal will be utilized.
If disposal of the material in liquid form is chosen, the Contractor must provide in writing, as part of the preconstruction meeting submittal, the name, location, telephone number, and a copy of the California Regional Water Quality Control Board (RWQCB) permit for disposal of PCC liquid residue, or if the disposal site is located outside of the State of California, a copy of a permit issued by that state is required. The engineer will verify the information before the Notice to Proceed is issued.
All PCC and related work, including grading and forming, shall be suspended if the Contractor does not have a PCC liquid residue or mixer wash out containment area or bin on site one (1) working day before the scheduled placement of PCC. The Contractor will not be allowed any additional compensation or extension of time for suspended operations due to not having a containment area or bin on site. The containment area or bin shall have sufficient room for two (2) days deposit of material.
The Contractor shall provide the engineer with a copy of the landfill receipts or disposal site receipt and weight ticket showing disposal of PCC liquid residues and wash out within five working days of disposal.
Add to Subsection 303-5.4.3, "Weakened Plane Joints, (a) General," of the Standard Specifications the following:
All weakened plane joints shall be spaced at a maximum of 10 ft for curbs, gutters, and sidewalks.
Scoring lines shall conform to those prevailing in the area and be uniform in spacing.
Revise Subsection 303-5.5.2, "Curb," of the Standard Specifications as follows:
Delete the first sentence in Paragraph 1 and add the following:
The curb and gutter surface shall not vary more than 0.01 ft from 10 ft straightedge except at the grade changes. Prior to the removal of the forms, the surface shall be finished true to grade by means of a straightedge float of not less than 10 ft in length, and operated longitudinally over the surface of the concrete. Form clamps shall be so constructed as not to interfere with the operation of the float. The form on the front of the curbs shall not be removed less than one (1)
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -165-
SPECIFICATIONS
hour, or more than six (6) hours after the concrete has been placed. In no event shall forms be removed while the concrete is sufficiently plastic to slump. The top and face of the finished curb shall be true and straight and top surface of curbs shall be of uniform width, free from humps, sags, blemishes or other irregularities.
Add to Subsection 303-5.5.2, “Curb” of the Standard Specifications the following:
Two component construction grade structural epoxy adhesive shall be used to bond fresh PCC curb to existing asphalt concrete or PCC. All surfaces to be bonded must be free of standing water, moisture, completely clean of dirt, curing compounds, grease, oil, paint, and unsound materials, which would prevent a solid bond. Smooth surfaces shall be sand blasted or mechanically abraded. All dust shall be vacuumed
Epoxy components shall be stored at 65 F - 85 F (18 C - 29 C) for 24 hours prior to use. The mixed epoxy shall be uniform in color, not show streaks, and not have air entrapment. The Contractor shall mix only the amount of epoxy that can be applied within the product’s pot life.
Pot life will decrease as the ambient temperature and/or mass size increases.
Add to Subsection 303-5.5.3, "Walk," of the Standard Specifications the following:
The sidewalk surface shall not exceed two percent (2%) cross fall and not vary more than 0.01 ft from the 10 ft straightedge except at grade changes, and the finished surface shall be free from humps, sags, blemishes or other irregularities. All sidewalks shall be a minimum of 4 in thick, except at driveways where the sidewalks shall be a minimum of 6 in. thick for single family residential areas and 8 in thick for all other areas and 6 in thick for curb return landings including access ramps.
Add to Subsection 303-5.6, “Curing,” of the Standard Specifications the following:
Curing compound shall be translucent with red fugitive dye, Type 1, in accordance with Section 201-4, "Concrete Curing Compound," of the Standard Specifications.
Add to Subsection 303-5.7, “Repairs and Replacements,” of the Standard Specifications the following:
In order to minimize vandalism damage to the finished PCC surfaces, the Contractor shall plan his work so that no PCC is poured after 1:00 p.m., unless otherwise authorized by the Engineer in the field.
The Contractor shall barricade and protect placed Portland Cement Concrete from all damages, marks, mars, and/or graffiti. Any Portland Cement Concrete damaged, defaced, discolored, or defective shall be replaced to the satisfaction of the Engineer at the Contractor's expense, and no additional time will be allowed.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -166-
SPECIFICATIONS
Grading, patching, or other remedies to correct the situation will not be accepted unless in the opinion of the Engineer the vandalized area is so small that it does not warrant replacement.
Concrete replacement areas shall be from score mark or control joint to score mark or control joint and full width of the sidewalk. All replacement areas shall be saw cut.
Add to Subsection 303-5.8, “Backfilling and Cleanup,” of the Standard Specifications the following:
A minimum of 12 in wide full depth asphalt concrete pavement repair patch is required when cross gutter, spandrel, driveways, curb, and gutter are placed adjacent to existing asphalt concrete pavement. The asphalt concrete pavement repair patch shall be placed within two (2) working days after the cross gutters, spandrels, driveways, curb and gutter are replaced. The asphalt concrete pavement shall be saw cut.
Payment
Payment for concrete work shall be per the Linear Foot (LF), Square Foot (SF), or per Each (EA), per the price named in the bid schedule, and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work necessary as specified in the Contract Documents and Specifications, Standard Drawings, supplemental details, these Special provisions, and as directed by the Engineer.
8. UTILITY LID ADJUSTMENT
Contractor shall be responsible to adjust pull boxes and valve covers to grade or to grade and/or new location, if required, subject to the approval of the utility company. Replacement of pull boxes at new grade and/or location may be required if identified on the Plans. The Contractor, at its own expense, shall be responsible to repair or replace any valve covers damaged by its operations
Manholes shall be adjusted to grade in accordance with Section 403 of the Standard Specifications and these Special Provisions.
Work shall consist of the adjusting to new grade existing manhole, Utility valve frames, meters, covers, and the furnishing and installing of new “cans” for the water valve boxes.
Manhole frames and covers shall be raised to the finished grade by the Contractor within 48 hours of final paving. The Contractor shall raise the tops of all frames and covers to range from flush to 1/4" above the finished grade of the immediately adjacent pavement.
The method of adjusting existing manholes frames and covers in areas of new pavement shall be as follows:
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -167-
SPECIFICATIONS
(1) Manhole frames and covers and manhole shafts shall be removed to a depth of six inches below subgrade and covered with an adequate steel cover. (2) Upon completion of roadway construction, circular holes, no larger than 1’ greater than the manhole, shall be cut where the manhole exists.
(3) The manholes shall then be raised to the proper grade, the manhole frames and covers replaced, and the pavement shall be replaced with an asphalt concrete structural section equivalent to that existing in adjacent areas.
If the manhole cover is unstable or noisy under traffic, said conditions shall be corrected by placing a coil of asphalt saturated rope, a plastic type washer or asphaltic compounds, as approved by the Engineer, on the cover seat.
Payment
Payment for utility lid adjustment shall be included in the other/related items of work (Bid Item 6: AC Pavement), and no additional compensation will be allowed therefore.
9. UTILITY IMPROVEMENTS (WATER, SEWER, ELECTRIC)
Utility improvements for this project involve for this project include water & sewer service laterals, fire hydrants, and street lights. Except for adjustments of utility covers/lids to grade, all utility improvements shall be constructed prior to the street improvements.
Utility improvements shall conform to and/or be coordinated with the following agencies:
City of Calexico – Water & Sewer Service Laterals, Fire Hydrants Imperial Irrigation District (IID) – Electric/Streetlights The layout/design of the proposed utility improvements shall conform to the details shown on the Plans, or per the standard details of the City, County, and IID, if differing from the details on the Plans.
Water Service Laterals
Water service laterals shall be seamless, annealed, Type K (soft) copper.
Water service saddles shall have a brass body with FIPT outlet, double stainless-steel bolts & nuts, and a single stainless-steel band.
Corporation stops shall be made of brass, ball-style, with an MIPT inlet and pack joint outlet.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -168-
SPECIFICATIONS
Angle meter stops shall be made of brass, ball-style, with a pack joint inlet and meter swivel nut (lock wing) outlet.
Customer shut-off valves shall be made of brass, with meter swivel nut (lock wing) inlet and FIPT outlet.
Water meters shall be furnished and installed by the City, upon payment from the Contractor.
Water meter shall have MIPT ends, compatible with meter swivel nut connections for the angle and customer shut-off valves.
Water meter boxes shall be polymer concrete with cast iron cover equipped with AMR/AMI transmitter hole within the cover.
Water meter boxes and meters shall be located behind the right-of-way (ROW), per the City’s Standard Utility Layout Plan.
Water service laterals shall be trenched per the City’s Standard Trench Detail 1, and wrapped with identification tape. Warning tape shall be provided at 1 foot (12 inches) above the water service lateral.
Compaction of water service lateral trench shall be 90% at the trench zone, and 95% of the surface layer, below the proposed Class II base of the proposed pavement.
Contractor shall pressure-test new water service laterals using potable water for a period of 4 hours at a pressure of 250 psi. A calibrated pressure recorder or pressure gauge will be used to record the pressure during the test period.
Water service laterals shall be disinfected through liquid hypochlorite, tested, flushed, and capped downstream of meter (for future service connections) prior to final acceptance by City.
Fire Hydrants
Hydrant heads shall made of ASTM B584 copper-sand alloy, with one (1) 4” port and two (2) 2.5” ports. A break-away spool and check valve (break check) shall be included with the hydrant, and placed directly underneath the hydrant. All above-ground fittings (hydrant, spool, break check) shall be painted with two (2) coats, with the finish coat of “safety yellow” color.
Hydrant laterals shall be PVC/PVCO C-900/C909, with plain ends for connection with mechanical joint (MJ) fittings.
Hydrant buries shall be ductile iron (DIP) with a flanged (FL) top end connection to the check valve and an MJ inlet connection (for connection to PVC).
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -169-
SPECIFICATIONS
Hydrant tees shall made of Ductile Iron, AWWA C110 fittings, with a flanged outlet and mechanical joint mainline (for connection to the existing pipe).
Valves shall be made of ductile iron body & bonnet, with a resilient wedge disc gate of ductile iron encapsulated in rubber, stainless steel stem, stainless steel operating nut, and stainless-steel bonnet bolts. Steel valve stem extensions shall be provided if depth to valve operating nut exceeds five (5) feet.
All buried ductile-iron products (tees, buries, bottom/lower half of break check valve) shall be wrapped in polyethylene wrap, and all bolts shall be wrapped with wax tape.
Valve boxes shall be made of PVC SDR, precast concrete, or cast/ductile iron. The top valve lid/cap shall be made of cast/ductile iron. A two-piece iron box/lid kit can be used in-lieu different materials for the box and lid. An 8-inch-wide x 8-inch-deep concrete ring shall be provided around the valve lid. All iron valve box/lid products shall be coated in asphaltic/bituminous material. The valve lid shall be painted in blue-color for identification.
Thrust blocks shall be installed at the hydrant tee, valve, hydrant bury, (3 total) and shall be per the City Standard or Imperial County Standard (Gateway-100/105).
Hydrants shall be located behind the back of sidewalk, per the City’s Standard Utility Layout Plan.
Hydrant laterals shall be trenched per the City’s Standard Trench Detail 1, and wrapped with identification tape. Warning tape shall be provided at 1 foot (12 inches) above the hydrant lateral.
Tracer wire shall be placed directly above the pipe identification tape.
Compaction of hydrant lateral trench shall be 90% at the trench zone, and 95% of the surface layer, below the proposed Class II base of the proposed pavement.
Contractor shall pressure-test new hydrant laterals using potable water for a period of 4 hours at a pressure of 250 psi. A calibrated pressure recorder or pressure gauge will be used to record the pressure during the test period.
Hydrant laterals shall be disinfected through liquid hypochlorite, tested and flushed prior to final acceptance by City.
Sewer Service Laterals
Sewer service laterals and fittings shall be constructed of Extra-Strength VCP or PVC SDR-35.
Sewer cleanout lids shall be made of cast/ductile iron, and include “Sewer” or “S” to identify the cleanout. An 8-inch-wide x 8-inch-deep concrete ring shall be provided around the sewer cleanout lids.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -170-
SPECIFICATIONS
Stoppers/end caps shall be provided at the end of the sewer lateral, at the property line, for future connection
Connections to the existing sewer shall be of a “wye” configuration, and shall be angled at 45- degrees vertically. Connection wyes shall match the material of the existing sewer (VCP, PVC, etc.). Transitions between PVC to VCP shall be made upstream of the wye connection using rubber transition couplings with stainless steel clamps.
Sewer laterals shall be trenched per the City’s Standard Trench Detail 1, and wrapped with identification tape. Warning tape shall be provided at 1 foot (12 inches) above the sewer lateral.
Tracer wire shall be placed directly above the pipe identification tape.
Compaction of sewer lateral trench shall be 90% at the trench zone, and 95% of the surface layer, below the proposed Class II base of the proposed pavement.
Streetlights
Streetlight poles shall be manufactured of steel, ASTM A500, with a minimum yield strength of 60,000 psi. Streetlights shall be 30’-35’ height, 15’ mast arm, and a mast arm rise of 4’ to 5’.
Anchor bolts shall be manufactured of ASTM F1554 Grade 55 steel, and shall be 2-inch diameter.
Nuts/washers for anchor bolts shall be made of ASTM F1554 Grade 55 steel.
Base plate and anchor plate for streetlight shall be manufactured of ASTM F1554 Grade 55 steel, with a thickness of 1.5-inches and 1’ (12-inch) square size.
The threads of the anchor bolts and the base plate shall be installed above the foundation/footing of the pole, to allow for replacement of the pole. The space shall be grouted at a 45-degree angle, and a square base cover shall be provided over the base plate following construction.
The footing for the streetlight shall be constructed of 560-C-3250 concrete, with #8 vertical reinforcement and #5 spiral reinforcement. Contractor shall provide 95% compaction for any fill soil around the bore hole for the concrete footing (if fill soil is necessary).
Wire for grounding of the streetlight and/or at pull boxes shall be #6 AWG. Grounding wire shall terminate in a grounding plate (or rod) adjacent to the footing and/or at pull boxes.
Conduit for streetlights/wire shall be of the size shown on the Plans (1.5” minimum), of rigid galvanized steel or PVC Schedule 80.
Conduit shall be trenched per the City’s Standard Trench Detail 1, and concrete (560-C-3250) shall be provided around the conduits, up to 8” square (3” clearance around the conduit).
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -171-
SPECIFICATIONS
Pull boxes/hand holes for streetlights shall be constructed of concrete or polymer concrete, and shall be of 12”x18” size. Pull boxes/hand holes shall be located in the rear or side of the streetlight, within the parkway or back of sidewalk. Crushed rock shall be placed under the pull box, with grouting on top of the crushed rock. A small (0.5”) drain hole at the center of the pull box, with perforated PVC.
Wires shall be joined inside of the pull box/handhole with a fuse, to allow for protection of the circuit. Fuses shall be Eaton-Bussman series, of the size matching the wire (i.e. #8 AWG) and of amperage rating to match the streetlight amperage (10 amps max). All conduit in the pull box/handhole shall be grounded with a ground clamp.
Wiring and conduit shall extend from the adjacent street lights or pull box to the proposed pull box, into the pole, and connecting to the luminaire. Alternate sources of power may be coordinated with the City and/or IID, in the event that adjacent street lights/pull boxes cannot be intercepted.
The luminaire shall be NextGen III Series LED Shoebox Light with Photocell 500 Watt/70,000 Lumen.
Street lights shall be located behind back of walk, per the City’s Standard Utility Layout Plan.
Power Pole & Overhead Wire Relocation
Power pole & overhead wire relocation shall be conducted by the Imperial Irrigation District (IID) and Utility Companies which own utilities along the existing overhead poles. The Contractor’s work shall be conducted around the relocation work, such that any items of the Contractor’s work that can occur without conflict around IID/Utility Company work can proceed (i.e. demolition and/or construction of southerly concrete curb & gutter), and that any work that will need to succeed the relocation work will not commence until the relocations have been completed.
Payment
Payment for utility work shall be per the Linear Foot (LF) or per Each (EA) price named in the bid schedule, and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work necessary as specified in the Contract Documents and Specifications, Standard Drawings, supplemental details, these Special provisions, and as directed by the Engineer.
10. STRIPING
Signing and Striping shall be placed as shown on plans, as directed by the engineer, and in conformance with these Special Provisions.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -172-
SPECIFICATIONS
All details and dimensions for traffic striping and marking shall conform to the Latest Caltrans Plan and specifications and California Manual on Uniform Traffic Control Devices, latest edition.
Thermoplastic Material
This work shall consist of furnishing and applying thermoplastic traffic stripes and pavement markings, including glass beads
The thermoplastic material shall conform to State Specification PTH-02SPRAY, PTH-02HYDRO or PTH-02ALKYD.
Paint Material
This work shall consist of applying painted traffic stripes and pavement markings, shall conform to the following State Specifications:
Paint Type Color State Specification No.
Waterborne Traffic Line White, Yellow and Black State Specification PTWB-01R2
Acetone-Based White, Yellow and Black State Specification PT-150VOC(A)
Waterborne Traffic Line for
disabled persons’ parking, and
other curb markings
Blue, Red and Green Federal Specification
TT-P-1952E
The color of painted traffic stripes and pavement markings must comply with ASTM D6628 The kind of paint to be used (waterborne or acetone-based) shall be determined by the Contractor based on the time of year the paint is applied and local air pollution control regulations.
Thinning of paint will not be allowed.
Paint shall be tested prior to use or the manufacturer shall provide the Engineer with a Certificate of Compliance in conformance with the provisions of Caltrans Specifications Section 6-2.03C, "Certificates of Compliance." The certificate shall certify that the paint complies with the specifications and that paint manufactured to the same formulation and process has previously passed State testing. A list of manufacturers that have produced paint meeting State specifications is available from the Transportation Laboratory. (Material supplied by manufacturers other than those that have manufactured approved paint will require complete testing.)
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -173-
SPECIFICATIONS
Glass Beads
Glass beads to be applied to the surface of the molten thermoplastic material shall conform to the requirements of State Specification 8010-004.
State Specifications for thermoplastic material and glass beads may be obtained from the Transportation Laboratory.
Surface Preparation and Application
Existing surfacing which is to receive the thermoplastic material shall be mechanically wire brushed to remove all dirt and contaminants. Surfaces of new portland cement concrete pavement to receive the thermoplastic material shall be mechanically wire brushed or abrasive blast cleaned to remove all laitance and curing compound.
Existing pavement markers which are damaged by blast cleaning or wire brushing shall be removed and replaced by the Contractor at the Contractor's expense.
Thermoplastic material shall be applied only to dry pavement surfaces and only when the pavement surface temperature is above 50° F.
A primer, of the type recommended by the manufacturer of the thermoplastic material, shall be applied to all asphaltic surfaces over 6 months old and to all portland cement concrete surfaces.
The primer shall be applied immediately in advance of, but concurrent with, the application of thermoplastic material. The primer shall be applied at the application rate recommended by the manufacturer and shall not be thinned.
Preheaters with mixers having 360 degree rotation shall be used to preheat material.
The thermoplastic material shall be applied to the pavement at a temperature between 400° F and 425° F, unless a different temperature is recommended by the manufacturer.
The thermoplastic material shall be applied by either spray or extrusion methods in a single uniform layer.
Stencils shall be used when applying thermoplastic material for pavement markings.
The pavement surface to which thermoplastic material is applied shall be completely coated by the material and the voids of the pavement surface shall be filled.
Unless otherwise specified in the special provisions, the thermoplastic material for traffic stripes shall be applied at a minimum thickness of 0.060-inch. Thermoplastic material for pavement markings shall be applied at a thickness of 0.100-inch to 0.150-inch. Glass beads shall be applied immediately to the surface of the molten thermoplastic material at a rate of not less than 8 pounds per 100 square feet. The amount of glass beads applied shall be measured by stabbing the glass bead tank with a calibrated rod.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -174-
SPECIFICATIONS
Application Equipment
Mechanical mixers shall be used to mix paint. Prior to applying, the paint shall be mixed a sufficient length of time to thoroughly mix the pigment and vehicle together, and shall be kept thoroughly agitated during its application.
Mechanical means shall be used to paint traffic stripes and pavement markings and to apply the glass beads for traffic stripes.
Equipment used in the application of traffic stripes and pavement markings shall produce stripes and pavement markings of uniform quality that conform to the specified requirements.
Stencils and hand spray equipment shall be used to paint pavement markings. Stencils shall conform to the dimensions shown on the plans.
The striping machine shall be capable of accurately superimposing succeeding coats of traffic paint upon the first coat and upon existing stripes at a speed of at least 5 miles per hour.
The striping machine shall consist of a rubber-tired vehicle that is maneuverable to the extent that straight lines can be followed and normal curves can be made in true arcs. It shall be capable of applying traffic paints and glass beads at the rates specified. The striping machine shall be equipped with the following: (a) a pointer or sighting device not less than 5 feet long and extending from the front of the machine; (b) a pointer or sighting device extending from the side of the machine to gauge the distance from the centerline for painting shoulder stripes; (c) a positive acting cutoff device to prevent depositing paint in gaps of broken stripes; (d) shields or an adjustable air curtain for line control; (e) pressure regulators and gages (if pneumatically operated) that are in full view of the operator; (f) a paint strainer in the paint supply line; (g) a paint storage tank with a mechanical agitator that operates continuously during painting operations; (h) a glass bead dispenser located behind the paint applicator nozzle and which is controlled simultaneously with the paint applicator nozzle; and (i) calibrated rods for measuring the volumes of paint and glass beads in the paint and glass bead tanks.
Spray equipment shall be of a proper type and of adequate capacity for the work. Air atomized spray equipment shall be equipped with oil and water extractors and pressure regulators and shall have adequate air volume and compressor recovery capacity. Spray gun tip needle assemblies and orifices shall be of the proper sizes.
Attention is directed to Caltrans Specifications Section 5-1.11, "Alternative Equipment," of these specifications.
Where the configuration or location of a traffic stripe is such that the use of a striping machine is unsuitable, traffic paint and glass beads may be applied by other methods and equipment approved by the Engineer. The Engineer will determine if the striping machine is unsuitable for a particular use.
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -175-
SPECIFICATIONS
Application
Traffic stripes and pavement markings shall be applied only on dry surfaces and only during periods of favorable weather. Painting shall not be performed when the atmospheric temperature is below 40° F when using acetone-based paint or below 50° F when using waterborne paint; when freshly painted surfaces may become damaged by rain, fog, or condensation; nor when it can be anticipated that the atmospheric temperature will drop below the aforementioned 40° F or 50° F temperatures during the drying period.
Surfaces which are to receive traffic stripes and pavement markings shall be cleaned of all dirt and loose material.
A one-coat 3-inch wide black stripe shall be painted between the two 4-inch wide yellow stripes of a double traffic stripe. If the two 4-inch wide yellow stripes are to be applied in 2 coats, the black stripe shall be applied concurrently with the second coat of yellow stripes.
On new surfacing, pavement markings and traffic stripes (except the black stripe between the yellow stripes of a double traffic stripe) shall be applied in 2 coats unless otherwise shown on the plans. The first coat of paint shall be dry before application of the second coat.
On 2-lane highways, when the first coat of the centerline stripe is applied in the same direction as the post miles increase, the right-hand spray gun of the 3 spray guns used to apply double yellow stripe shall be used to apply a single yellow stripe. When the first coat of the centerline stripe is applied in the same direction as the post miles decrease, the left-hand spray gun of the 3 spray guns used to apply double yellow stripe shall be used to apply a single yellow stripe. The second coat of centerline striping shall be applied in the opposite direction that the first coat was applied.
On existing surfacing, pavement markings and traffic stripes shall be applied in one coat.
Each coat of paint for any traffic stripe, including glass beads where required, shall be applied in one pass of the striping machine, regardless of the number, widths and patterns of individual stripes involved.
Paint to be applied in one coat shall be applied at an approximate rate of one gallon per 107 square feet.
Paint to be applied in 2 coats shall be applied approximately as follows:
Square Foot Coverage
Per Gallon
Paint Type First Coat Second Coat
Waterborne Paint 215 215
Acetone-Based Paint 360 150
Apply glass beads at an approximate rate of 5 lb/gal of paint
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -176-
SPECIFICATIONS
The exact rate of paint to be applied will be determined by the Engineer. The volume of paint applied shall be measured by stabbing the paint tank with a calibrated rod. At the option of the Engineer, if the striping machine is provided with paint gages, the volume of paint may be determined by using the gages.
Unless otherwise directed by the Engineer, glass beads shall be uniformly incorporated in all coats of paint concurrently with the application of the paint, except that glass beads shall not be applied to black paint. Beads shall be embedded in the coat of traffic paint being applied to a depth of one-half their diameter.
Glass beads shall be applied at an approximate rate of 5 pounds per gallon of paint. The exact rate will be determined by the Engineer. The amount of glass beads applied shall be measured by stabbing the glass bead tank with a calibrated rod.
The Contractor or representative will meet with the City Public Works Director/City Engineer and will clearly mark existing loops not to be damaged or removed.
If any part of the loop conductor, including the portion leading to the adjacent pull box, is damaged by the Contractor’s operations, the entire detector loop shall be replaced. If any adjacent loop(s) are/is damaged during such replacement, that loop shall also be replaced.
Raised Pavement Markers
The markers shall conform to the shape, dimensions and tolerances shown on the plans.
Pavement markers shall be of the type and color shown on the plans or specified in these specifications and the special provisions.
Pavement markers shall conform to one or more of the following types:
Type A— Non-Reflective White Markers
Type AY— Non-Reflective Yellow Markers
Type C— Red-Clear Retroreflective Markers
Type D— 2-Way Yellow Retroreflective Markers
Type G— One-Way Clear Retroreflective Markers
Type H— One-Way Yellow Retroreflective Markers
Certificates of compliance shall be furnished for pavement markers as specified in the special provisions.
Except as otherwise provided in this Section 81-3.03, pavement markers shall be cemented to the pavement with hot melt bituminous adhesive or rapid set type epoxy adhesive in conformance with the manufacturer's instructions
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -177-
SPECIFICATIONS
Traffic Loops
The Contractor or representative will meet with the City Public Works Director/City Engineer and will clearly mark existing loops not to be damaged or removed.
If any part of the loop conductor, including the portion leading to the adjacent pull box, is damaged by the Contractor’s operations, the entire detector loop shall be replaced. If any adjacent loop(s) are/is damaged during such replacement, that loop shall also be replaced Payment
Payment for striping shall be included in the other/related items of work (Bid Item 6: AC Pavement), and no additional compensation will be allowed therefore. .
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -178-
SPECIFICATIONS
THIS PAGE LEFT BLANK INTENTIONALLY
WEAKLEY STREET IMPROVEMENT
FED. AID PROJECT NO. CML-5168(032) -179-
SPECIFICATIONS
CALTRANS EXHIBITS
(REQIRED FEDERAL AID CONTRACT LANGUAGE)
WEAKLEY STREET IMPROVEMENT
FEDERAL-AID PROJECT NO. CML-5168(032)
CALTRANS EXHIBIT 10-Q: DISCLOSURE OF LOBBYING ACTIVITIES CALTRANS EXHIBIT 12-B: BIDDER’S LIST OF SUBCONTRACTORS (DBE AND NON-DBE) □ □ □
□ □
□ □ -
-
-
B -
-
-
-
□ □
Local Assistance Procedures Manual EXHBIT 10-Q
Disclosure of Lobbying Activities
EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352
1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offer/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
e. loan guarantee year ____ quarter _________
f. loan insurance date of last report __________
4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:
Prime Subawardee
Tier _______ , if known
Congressional District, if known Congressional District, if known
6. Federal Department/Agency: 7. Federal Program Name/Description:
CFDA Number, if applicable ____________________
8. Federal Action Number, if known: 9. Award Amount, if known:
10. Name and Address of Lobby Entity 11. Individuals Performing Services (If individual, last name, first name, MI) (including address if different from No. 10) (last name, first name, MI)
(attach Continuation Sheet(s) if necessary)
12. Amount of Payment (check all that apply) 14. Type of Payment (check all that apply) $ _____________ actual planned a. retainer
b. one-time fee
13. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
b. in-kind; specify: nature _______________ e deferred
Value _____________ f. other, specify _________________________
15. Brief Description of Services Performed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 12:
(attach Continuation Sheet(s) if necessary)
16. Continuation Sheet(s) attached: Yes No
17. Information requested through this form is authorized by Title 31 U.S.C. Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to Congress
semiannually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Signature: ________________________________________
Print Name: _______________________________________
Title: ____________________________________________
Telephone No.: ____________________ Date:___________
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
Standard Form LLL Rev. 04-28-06
Distribution: Orig- Local Agency Project Files