CITY OF CAMARILLO
PUBLIC WORKS DEPARTMENT
CAPITAL PROJECTS
NOTICE TO BIDDERS, PROPOSAL, CONTRACT
AND SPECIFICATIONS
FOR THE CONSTRUCTION OF
ADVANCED METERING INFRASTRUCTURE
PROJECT NO. WT-5080
BIDS TO BE OPENED ON
June 27, 2024, AT 3:00 P.M.
JAMES CAMPERO RYAN LIPPINCOTT
ASSISTANT DIRECTOR OF PUBLIC WORKS - PRINCIPAL CIVIL ENGINEER
CITY ENGINEER
R. C. E. 76459, Exp. 12/31/2024
ADVANCED METERING INFRASTRUCTURE -
PROJECT NO. WT-5080
PROJECT ADMINISTRATION
All inquiries relative to this project shall be directed to Ryan Lippincott, Principal Civil Engineer of the City of Camarillo Public Works Department, prior to opening of bids. All questions relating to interpretation of the Contract Documents or products must be submitted in writing seven (7) days prior to the opening of bids , and responses will be in the form of written addenda, if required as further described in the bid documents . Questions submitted after this time period will not be answered.
Ryan Lippincott
Principal Civil Engineer
Public Works Department
601 Carmen Drive
Camarillo, CA 93010
Telephone: (805) 388-5334
Fax: (805) 388-5387
Email: [email protected]
(8-2023)
CITY OF CAMARILLO
1. NOTICE INVITING BIDS
2. INSTRUCTIONS TO BIDDERS
3. BID PROPOSAL
4. PUBLIC WORKS CONTRACT
5. GENERAL CONDITIONS/SPECIFICATIONS
6. SPECIAL PROVISIONS
ADVANCED METERING INFRASTRUCTURE -
PROJECT NO. WT-5080
Project Number: WT-5080
Date:
Assistant Director of Public Works - City Engineer
BIDS WILL BE RECEIVED UNTIL
June 27, 2024, AT 3:00 P.M.
Via electronic transmission on the City of Camarillo
PlanetBids portal site
(8-2023)
NOTICE INVITING BIDS
- 1 -
CITY OF CAMARILLO
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that the City of Camarillo (“CITY”), will receive bids for the below stated Project ONLY via electronic transmission on the CITY’S online PlanetBids portal site until 3:00 p .m., June 27 , 202 4, and will be opened and posted online via PlanetBids portal site immediately thereafter.
ADVANCED METERING INFRASTRUCTURE -
PROJECT NO. WT-5080
The project to be constructed consists of mobilization and demobilization, retrofit of existing Automated Meter Reading water meters and replacement of existing analog water meters with new Advanced Metering Infrastructure (AMI) water meters, install meter boxes/lids, network and communication equipment, and related work.
Obtaining Bid Documents: The Bid Documents for this project are on file in the office of the undersigned. In addition prospective bidders may obtain free copies of these documents, including Proposal, Bid forms, Specifications, and Plans by registering online as a prospective bidder on the C ity of C amarillo PlanetBids portal site :
https://pbsystem.planetbids.com/portal/56271/portal-home. Hard copies are also available from the City of Camarillo, at 601 Carmen Drive, Camarillo, California 93010. THERE IS A $ 70 SERVICE CHARGE (ADD $ 15 POSTAGE IF PLANS ARE TO BE MAILED). These amounts are not refundable. Checks should be made payable to the C ity of Camarillo. Bidders may also obtain Bid Documents from the CITY website at https//www.cityofcamarillo.org/cip with no fee.
Plans, general and special provisions, and proposal forms for the project are also filed with the following: Dodge Data & Analytics , www.construction.com; Ventura County Contractors’ Association, 1830 Lockwood Street, Suite 110, Oxnard, California 93030; BidAmerica, 41085 Elm Street, Murrieta, California 92562 (www.bidamerica.com); Plan Room, Construction Bidboard, Inc., 11622 El Camino Real, 1 st Floor, San Diego, California 92130; Builders Notebook, 133 E. De La Guerra Street, Suite 62, Santa Barbara, California, 93101; and are by reference made a part of this Notice.
Bidders must be registered on the City of Camarillo’s PlanetBids portal in order to receive addendum notifications and to submit a bid. Go to PlanetBids for bid results and awards. It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.
Plans and special provisions are based on the use of the Standard Specifications for Public Works Construction, 2018 edition, written and promulgated by Public Works Standards, Inc. and all supplements thereto.
Bid Bond: The bid must be accompanied with an uploaded scanned copy to PlanetBids of the bid security in the form of a money order, a certified cashier’s check, or bidder’s bond executed by an admitted surety, made payable to CITY. The bid security shall be an amount equal to ten percent (10%) of the total annual bid amount included with their proposals as required by California law.
(8-2023)
NOTICE INVITING BIDS
- 2 -
Note: The original security of the three (3) lowest bidders must be submitted to the Public Works Department at 601 Carmen Drive, Camarillo, California 93010, in a sealed envelope and be received or postmarked within three (3) City business days after the bid due date and time for the bid to be considered. The sealed envelope should list the Bidder’s Name and be plainly marked on the outside: “SEALED BID SECURITY FOR ADVANCED METERING INFRASTRUCTURE – PROJECT NO. WT-5080.”
Pre-Bid Meeting: A mandatory pre-bid meeting is scheduled for 10:00 a.m. on June 6 , 2024, in the Central Conference Room at Camarillo City Hall, 601 Carmen Drive, Camarillo, California 93010.
Required Contractor’s License(s): Under Business & Professions Code section 7028.15 (e), a bid submitted to the City must be by a licensed contractor in accordance with Division 3, Chapter 9 of the Business & Professions Code unless one of the exceptions in Section 7028.15 applies.
Under Public Contract Code section 3300, the bidder must possess at the time a contract is awarded all classifications of contractor’s licenses required by the City. For this project, the City requires that the bidder possess a valid Class A contractor’s license.
Under Public Contract Code section 20103.5, failure of a bidder to be properly licensed at the time of the award of the contract will constitute a failure to execute the contract and will result in a forfeiture of the security of the bidder.
Required Contractor and Subcontractor DIR Regi
stration: The City will accept bid s only
from bidders that (along with all subcontractors listed) are currently registered and qualified to perform public work pursuant to Labor Code section 1725.5; provided, however, that if a bidder is a joint venture (Business & Professions Code § 7029.1) or if federal funds are involved in the project, then City may accept a non -complying bid provided that the bidder and all listed subcontractors are registered at the time the contract is awarded. Information on registration with the DIR is available at: https://www.dir.ca.gov/Public-Works/Contractor-Registration.html.
This is a separate requirement from the Contractors State License Board licensing requirement.
Substitution of Securities: In accordance with Public Contract Code section 22300, substitution of eligible and equivalent securities for any moneys withheld to ensure performance under the contract for the work to be performed will be permitted at the request and expense of the successful bidder. Such equivalent securities must be deposited with City or with a state or federally chartered bank as the escrow agent who will then pay such moneys to the contractor.
Upon satisfactory completion of the contract, the securities will be returned to the contractor.
Securities eligible for investment include those listed in Government Code section 16430, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the contractor and City. The contractor will be the beneficial owner of any securities used to secure its performance. Any escrow agreement will be substantially similar to the form set forth in Public Contract Code section 22300.
Federal Certificate: If this Notice indicates that this project is a federally-funded project and the Bid Proposal is for more than $100,000, the bidder and each of its subcontractors must submit signed copies of the Federal Certificate for Contracts, Grants, Loans and Cooperative Agreements.
(8-2023)
NOTICE INVITING BIDS
- 3 -
Labor Code Compliance: Any contract entered into pursuant to this Notice will incorpor ate the applicable provisions of the California Labor Code.
Prevailing Wage Laws : The successful bidder must comply with all prevailing wage laws applicable to the project, and related requirements contained in the contract documents. Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the contract, as determined by Director of the State of California Department of Industrial Relations, are on file at the City, and may be obtained from the DIR website:
http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. Upon request, City will make available copies to any interested party. Also, the successful bidder must post the applicable prevailing wage rates at the work site.
If federal funds are used to pay f or
the project, contractor and any subcontractor must agree to comply, as applicable, with the labor and reporting requirements of the Davis -Bacon Act (40 USC § 276a-7), the Copeland Act (40 USC § 276c and 18 USC § 874), and the Contract Work Hours and Safety Standards Act (40 USC § 327 and following).
Federal Wage Rates: For projects using federal funds that are subject to the Davis-Bacon Act (40 USC § 276a-7), a copy of the Federal determination of prevailing wages is available on the Internet at http://www.wdol.gov and the determinations must be complied with. Prevailing wage determinations must also be posted at each job site. The successful bidder and any subcontractor must agree to comply, as applicable, with the labor and reporting requirements of the Davis-Bacon Act, the Copeland Act (40 USC § 276c and 18 USC §874), and the Contract Work Hours and Safety Standards Act (40 USC § 327 and following).
Payroll Records and P revailing Wage Monitoring: This project is subject to prevailing wage compliance monitoring and enforcement by the Department of Industrial Relations. (Labor Code § 1771.4.). Each contractor and subcontractor must keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by the contractor or subcontractor in connection with the public work. These records must be certified and made available by the contractor as required by Labor Code section 1776. In the case of state -funded public works projects, certified payroll reports must be provided to City on a weekly basis. In the case of federally-funded public works project and in accordance with 29 C. F. R. § 5.5(a)(3), the contractor will be required to submit weekly payroll reports and compliance statements for this project.
Reservation of Rights: The City Council reserves the right to reject any or all bids , waive any irregularities in the bids, and to make an award or any rejection in what it alone considers to be in the best interest of the City.
Dated this ________ day of _______________, 20__.
CITY OF CAMARILLO
By:
James Campero
Assistant Director of Public Works –
City Engineer
(8-2023)
INSTRUCTIONS TO BIDDERS
- 1 -
CITY OF CAMARILLO
INSTRUCTIONS TO BIDDERS
WORK IDENTIFICATION: ADVANCED METERING INFRASTRUCTURE-
PROJECT NO. WT-5080
1. Terms Defined
1.1 Terms used in these Instructions to Bidders which are defined in the General Conditions/Specifications have the meaning assigned to them in the General Conditions/Specifications.
1.2 The term “successful bidder” means the lowest, responsible bidder to whom City makes an award of contract on the basis of City’s evaluation as provided in these Instructions.
1.3 The term “Standard Specifications” or “S.S.P.W.C.” means Standard Specifications for Public Works Construction written and promulgated by Public Works Standards, Inc., 2018 edition and all supplements thereto, available from BNi Publications, Inc., 990 Park Center Drive, Suite E Vista, CA 92081.
2. Copies of Contract Documents
2.1 Bidders may obtain complete sets of the Contract Documents from PlanetBids, the City of Camarillo website, or the City’s Public Works Department for the sum stated in the notice inviting bids.
2.2 Bidders will use a complete set of Contract Documents in preparing bids.
2.3 The City makes copies of the Contract Documents available, on the above terms, for the sole purpose of obtaining bids for the Work and does not confer a license or g rant permission for any other use of the Contract Documents.
2.4 Complete sets of Contract Documents must be used in preparing bids. It is the bidder’s obligation to ensure that the bidder has received a complete set of Contract Documents. Neither City nor its agents, officers or employees assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents.
The City does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading, or printing of the Bidding Documents.
3. Qualifications of Bidder
3.1 The City will accept bids only from bidders that (along with all subcontractors listed) are currently registered and qualified to perform public work pursuant to Labor Code section 1725.5; provided, however, that if a bidder is a joint venture (Business & (8-2023)
INSTRUCTIONS TO BIDDERS
- 2 -
Professions Code §7029.1) or if federal funds are involved in the project, then City may accept a non-complying bid provided that the bidder and all listed subcontractors are registered at the time the contract is awarded. This is a separate requirement from the Contractors State License Board licensing requirement below.
3.2 The bidder must be licensed to perform as prime contractor in accordance with the provisions of the Contractor’s State License Law (Bus. & Prof. Code § 7000 and following). Prior to awarding a bid, unless an exemption set forth in Business and Professions Code section 7028.15 applies, City will verify that the bidder was properly licensed when the bid was submitted. If a bidder was not so licensed, the bid will be considered non-responsive and will be rejected by City.
Under Public Contract Code section 3300, the bidder must possess at the time a contract is awarded all classifications of contractor’s licenses required by the City. For this project, the City requires that the bidder possess a valid Class A contractor’s license.
3.3 In addition to a state license, the contractor must also obtain a City of Camarillo business tax certificate before commencing work. The business tax certificate may be secured after the bids are opened, but prior to executing the contract. The business tax certificate must be kept current throughout the project until the recording of the Notice of Completion.
3.4 In order for City to determine the successful bidder, the bidder must be prepared to submit in writing, within five days after being requested to do so by City, such information and data as City may request, including without limitation, financial data, and previous experience. City reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy City that the bidder is the lowest responsible bidder properly qualified to carry out the contract.
3.5 The bidder may be required to establish to the satisfaction of City the reliability and responsibility of the persons or entities proposed to furnish and perform the work described in the Contract Documents.
3.6 Experience: The bidder must have a minimum of 5-years of experience in constructing work similar in character and magnitude to the work included in the bid. The work must be prosecuted with employees meeting the experience requirements along with appropriate apprentices. Employees used for satisfying this experience requirement or alternate staff with equal or better experience must be used continuously for the duration of the project.
Changes in staffing must be submitted for approval by the Engineer.
4. Examination of Contract Documents and Site
4.1 Before submitting a bid, the bidder must: (i) examine the Contract Documents thoroughly, including without limitation the Contract wherein each of the other Contract Documents is identified; (ii) visit the site and the locality where the work is to be performed to become familiar with local conditions that may in any manner affect the cost, progress or performance of the work in strict accordance with the Contract Documents; (iii) become familiar with all federal, state and local laws, ordinances, rules and regulations that may in any manner affect the cost, progress or performance of the work in strict accordance with the (8-2023)
INSTRUCTIONS TO BIDDERS
- 3 -
Contact Documents; and (iv) study and carefully correlate bidder’s observations with the Contract Documents.
4.2 Under Public Contract Code section 3400 and the Contract Documents, all specifications are deemed to include the words “or equal,” provided, however, permissible exceptions may be noted in the General Conditions/Specifications.
4.3 Reports, if any, of investigations and test of subsurface and latent physical conditions at the work site or otherwise affecting cost, progress or performance of the work which have been relied upon by the City Engineer in preparing the drawings and specifications are identified in the Special Provisions. City will make copies of such reports available to any bidder upon request. These reports are not guaranteed as to accuracy or completeness, nor are they part of the Contract Documents. Before submitting the bid, the bidder must, at bidder’s expense, make such additional investigations and tests as the bidder may deem necessary to determine its bid for performance of the work in strict accordance with the Contract Documents.
4.4 Upon request to the office of the City Engineer at 601 Carmen Drive, Camarillo, 805- 388-5340, City will provide each bidder reasonable access to the job site to conduct such investigations and tests as the bidder may deem necessary for submission of its bid. Bidders performing investigative testing must obtain permit and restore areas affected by such activities. Investigations and tests that cause unreasonable disruptions may not be permitted.
4.5 The lands upon which the work is to be performed, rights -of-way for access thereto and other lands designated for use by contractor in performing the work are identified in the Drawings and/or Specifications.
4.6 By submitting a bid, the bidder warrants that it has complied with every requirement of this Section 4 and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the work.
5. Interpretation
5.1 In the event of conflict between requirements as shown on the drawings and the specifications, the following order of precedence will govern: permits from other agencies; change orders; supplemental agreements and approved revisions to plans and specifications; Special Provisions; General Conditions/Specifications; plan details ; Plans; Standard Plans; Standard Specifications; Reference Specifications. In the event of any discrepancy between any drawings and the figures written thereon, the figures will govern.
5.2 All questions about the meaning or intent of the Contract Documents must be submitted to the Engineer in writing not less than five days prior to the date for the opening of bids.
5.3 All interpretations will be issued by written Addenda, which will be on file in the office of the City Engineer at 601 Carmen Drive, Camarillo, and posted to the City’s website, PlanetBids, and distributed to the planrooms listed in the Notice Inviting Bids It is the bidder’s responsibility to determine if any Addenda have been issued. Failure of the bidder to receive any such Addenda will not relieve the bidder from any obligation under its submitted bid.
(8-2023)
INSTRUCTIONS TO BIDDERS
- 4 -
5.4 Only interpretations issued by written Addenda will be binding. All such Addenda will become part of the Contract Documents. Interpretations issued orally or by any means other than as specified in this Section 5 will have no legal effect.
6. Bid Proposal
6.1 Bids MUST be submitted on the City of Camarillo PlanetBids Portal. Hard copy bids submitted or any other method of bid submission to the City of Camarillo will not be accepted. Each bid must be on a Bid Proposal furnished by City as part of the Contract Documents. Any change in, or addition to, the Bid Proposal or any other modification of the Bid Proposal which is not specifically called for in the Contract Documents or the omission from the Bid Proposal of any information or response which is specifically called for in the Contract Documents may result in City’s rejection of the bid as not being responsive to the Notice Inviting Bids.
6.2 All blanks in the Bid Proposal must be appropriately responded to. If an answer or other response to a blank is not applicable, the bidder should respond with “N.A.”
6.3 Bid on all items listed in the Bid Schedule including all Prices (Unit and Total).
6.4 State in figures the unit prices, lump sum prices and extensions as indicated, which will be the prices for which you propose to supply all services and materials and to perform all work required by the plans and specifications. All items described are to be construed as complete and in place.
6.5 Include in the items for which bids are entered, all work shown on the plans or required by the specifications for which a specific bid item is not provided.
6.6 The Bid Proposal may not contain any erasures, interlineations or other corrections, unless each such correction is suitably authenticated by affixing in the margin immediately opposite the correction the initials of the person(s) signing the bid.
6.7 The Bid Proposal and each Attachment must be executed in the manner r
equired by Section 14 below.
6.8 No person, including without limitation, any individual, partnership or corporation, may make, file or be interested in more than one bid for the work unless alternate bids are specifically called for in the Specifications. A person that has submitted a sub- bid to a bidder or that has quoted prices of materials to a bidder is not disqualified from submitting a sub-bid or quoting prices to other bidders or making a prime bid.
6.9 When the Notice Inviting Bids indicates that this project is a federally-funded project and the Bid Proposal is for more than $100,000, the bidder and each of its subcontractors must submit signed copies of the Federal Certificate for Contracts, Grants, Loans and Cooperative Agreements.
(8-2023)
INSTRUCTIONS TO BIDDERS
- 5 -
7. Submission of Bid
7.1 The bid must be submitted within the time prescribed, at the place and in the manner indicated in the Notice Inviting Bids.
7.2 The bid must be accompanied by bidder’s security in an amount equal to at least ten percent (10%) of the bid amount, which security must be lawful money of the United States of America and in one of the following forms: (i) cash; (ii) cashier’s check made payable to City; (iii) certified check made payable to City; or (iv) bid bond executed by a surety insurer authorized to do business in the State of California and made payable to City. If the security is a bid bond, it must be submitted on the form which is part of the Bid Proposal or on a form substantially similar thereto. (Public Contract Code § 20170.)
7.3 All bids must be accompanied with an uploaded scanned copy of the bid security uploaded to PlanetBids. The original security of the three (3) lowest bidders must be submitted to the Public Works Department at 601 Carmen Drive, Camarillo, California 93010, in a sealed envelope and be received or postmarked within three (3) City business days after the bid due date and time for the bid to be considered. The sealed envelope should list the Bidder’s Name and be plainly marked on the outside: “SEALED BID SECURITY FOR ADVANCED METERING INFRASTRUCTURE – PROJECT NO. WT-5080.”
7.4 The bid form, bid security, and all other documents required to be submitted with the bid must be submitted via electronic transmission on the City of Camarillo PlanetBids portal site as further described in the Notice to Bidders.
7.5 Bidders must be registered on the City of Camarillo’s PlanetBids portal in order to submit a bid. Go to the PlanetBids portal site for bid results and awards. It is the responsibility of the bidder to submit the bid with sufficient time to be received by PlanetBids prior to the bid opening date and time. Allow time for technical difficulties, uploading, and unexpected delays. Late or incomplete bids will not be accepted.
7.6 Submission of a bid on PlanetBids portal shall constitute acknowledgement and acceptance of all terms and conditions set forth herein.
8. Withdrawal or Modification of Bid
The bidder may withdraw or modify its bid in the PlanetBids Portal system at any time prior to the opening of bids.
9. Bids to Remain Open
All bids will remain open for 60 days after the date of the opening of bids. Prior to that date, City may, at its sole discretion, (i) release any bid and return the bidder’s security, or (ii) release all bids and return all bidder’s security, upon the successful bidder’s furnishing of the required bonds and certificate and any other required documents and return to City the required number of executed copies of the Contract.
(8-2023)
INSTRUCTIONS TO BIDDERS
- 6 -
10. Errors In Bid
10.1 If a discrepancy between the unit price and the item total of a bid exists, the unit price will control unless the unit price is illegible, omitted, or the same as the item total, in which case the bid will be deemed nonresponsive. If applicable, the total bid amount will be adjusted according to any revised item totals.
10.2 If a discrepancy between the item totals and the total bid amount exists, the item totals will control unless the total bid is illegible or omitted, in which case the bid will be deemed nonresponsive.
10.3 Except as provided in Sections 10.4 and 10.5 b
elow, bidders will not be
released from their bids on account of error.
10.4 W
here the prime contractor asserts a claim of inadvertent clerical error in the listing of a subcontractor, City will allow the substitution of the intended subcontractor under the procedures set forth in Public Contract Code section 4107.5.
10.5 Where the bidder gives City notice addressed to the City contact listed in the Project Administration page within five days of the opening of the bid and can establish to the satisfaction of City that a mistake was made which makes the bid materially different than intended, that the mistake was made in filling out the bid and not due to error in judgment or carelessness in inspecting the site or in reading the plans or specifications and specifies how the mistake occurred, City will relieve the bidder without forfeiture of security in accordance with Public Contract Code section 5100 and following.
11. Bid Analysis and Determination of Responsive Bid
11.1 After the bids have been opened a nd uploaded to Plane tBids, the Bid Schedule will be checked and compared; and after the withdrawal of any bids as provided in Section 8 above; and after errors in bids are adjusted as provided in Section 10 above, the results will be made public.
11.2 Failure of a bidder to attend a mandatory pre -bid meeting will result in its Bid not being accepted and/or being rejected.
11.3 A b id from any individual, firm, partnership, corporation, or association which prepared, in part or in whole, the Plans, Specifications, or estimates for the Contract will be rejected.
11.4 More than one bid for the same Contract from any individual, firm, partnership, corporation, or association under the same or different names may be rejected.
Reasonable grounds for believing that any bidder has an interest in more than one b id for the Work may be cause for rejecting all bids in which such bidder is interested. However, this requirement does not prevent a bidder who submits a bid from being listed as a subcontractor by another bidder. Apparent collusion among bidders may be sufficient cause for rejecting any or all bids, and the participants in such collusion may be barred from future bidding.
11.5 A bid in which a bid item is left totally blank will be considered nonresponsive and will be rejected.
(8-2023)
INSTRUCTIONS TO BIDDERS
- 7 -
11.6 A bid in which the Contract Unit Prices are unbalanced may be considered nonresponsive and may be rejected.
11.7 A b id in which the signature of the bidder has been omitted may be considered nonresponsive and may be rejected.
11.8 A bid in which each section of the Bid Proposal has not been completely filled out, or which shows any alteration of form or irregularities of any kind, or which contains any additions or conditional or al ternate b ids that are not called for, may be considered nonresponsive and may be rejected.
11.9 A b id in which the Acknowledgement of Addenda Received form is missing, or in which the receipt of each Addendum issued has not been acknowledged, may be considered nonresponsive and may be rejected.
11.10 A bid in which the Noncollusion Declaration form is missing, or in which the form has not been executed and signed, may be considered nonresponsive and may be rejected.
11.11 A b id in which the Request for Local D BE Program Preference Consideration and DBE Firm/Organization Information Form is missing, or in which the form has not been completely filed out, may be considered nonresponsive and may be rejected.
11.12 A bid in which the Bidder DBE Information form is required to be submitted with the b id and is missing, or in which the Bidder DBE Information is not submitted within the time specified in the Special Provisions, may be considered nonresponsive and may be rejected.
11.13 A bid in which the List of Subcontractors form is missing will be considered nonresponsive and will be rejected.
11.14 A b id in which the List of Subcontractors form or the Bidder DBE Information form is incomplete, or the data included therein is inaccurate, inconsistent, of a misrepresentation of the work to be subcontracted or materials to be procured, may be considered nonresponsive and may be rejected.
11.15 The bidder must perform, with its own organization, Contract work amounting to at least 50 percent of the Contract Price. A bid which fails to meet this requirement will be considered nonresponsive and will be rejected.
11.16 A bid in which the Bid Guaranty is missing, or in which the Bid Guaranty surety bond is not signed by the Surety, or in which the Surety has not had the Bid Guaranty surety bond notarized, or is not provided to the City, if one of the three lowest bidders, 3 business days after opening as further detailed in the NIB, will be considered nonresponsive and will be rejected.
(8-2023)
INSTRUCTIONS TO BIDDERS
- 8 -
12. Award of Contract
12.1 City reserves the right to reject any and all bids. City also reserves the right to reject any bid that is not in strict accordance with the Contract Documents or, in the alternative, to waive any irregularity or informality in any bid or in the bidding.
12.2 If alternate bids are called for in the Specifications, the contract may be awarded at the election of City to the successful bidder on the base bid or on the base bid and any alternate or combination of alternates specifically identified in the Specifications as being used for the purpose of determining the lowest bid price.
12.3 If the contract is to be awarded, it will be awarded to the lowest responsible bidder. City may conduct such investigations as it deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications and financial ability of the bidders. The award, if made, will be within 60 days after the opening of bids.
12.4 If the lowest responsible bidder refuses or fails to execute the contract, City may consider the next lowest bidder to be the lowest responsible bidder.
12.5 The periods of time specified in this Section within which the award of contract may be made, are subject to extension for such further period as may be agreed upon in writing between City and the bidder concerned.
13. Delivery of Contract
13.1 An official “Notice of Award of Contract” will be emailed or mailed to the successful bidder, enclosing the contract and bond forms for signature.
13.2 Within 10 days after the Notice of Award of Contract, the successful bidder must sign and deliver at least three counterparts of the Contract to the City of Camarillo together with security in a form acceptable to City’s Attorney’s office guaranteeing both one hundred percent (100%) of payment (labor and materials) and one hundred percent (100%) of performance, certificates and endorsements to satisfy the insurance requirements of the Contract, proof of a valid City of Camarillo business tax certificate and any other documents required by the Contract Documents. Bonds must be submitted on the forms which are part of the Contract Documents; no substitutions will be accepted. Within 10 days of receipt of the Contract and related documents, City will deliver one fully signed counterpart of the Contract to the successful bidder.
13.3 The C ont
ract and each attachment must be executed in the manner required by Section 14 below.
13.4 If the successful bidder fails to execute and deliver the Contract and furnish the required bonds, certificates and other documents within 10 days after the Notice of Award of Contract, City may annul the award of the contract and the bidder’s security will be forfeited, except as provided by Public Contract Code section 20174.
(8-2023)
INSTRUCTIONS TO BIDDERS
- 9 -
14. Signatures
14.1 The Contract Documents and all attachments must be executed in the following manner: If the bidder is:
(a) An individual, in the name of the individual and if doing business by a fictitious name, the fictitious name and, if the document is the Bid Proposal or Contract, the business address and telephone number of the individual must be shown below the signature.
(b) A partnership, in the partnership name and signed by a general partner, whose title must appear under the signature and, if the document is the Bid Proposal or Contract, the business address and telephone number of the partnership must be shown below the signature.
(c) A corporation, in the corporate name by a duly authorized officer or agent accompanied by evidence of authority to sign and the corporate seal must be affixed and attested by the secretary or an assistant secretary. If the document is the Bid Proposal or Contract, the state of incorporation must be shown below the corporation name, and the corporate address and telephone number must be shown below the signatures.
14.2 Attorneys-in-fact who sign any Contract Document or any attachment thereto must file with the document a certified copy of their power of attorney to sign such document.
14.3 Electronic Signatures; Documents will be considered executed when the signature page of a party is delivered by electronic transmission. Such electronic signatures will have the same effect as an original signature.
14.4 Signatures on all bonds must be acknowledged before a notary public and a notary’s certificate of each acknowledgment must be scanned and uploaded to Planet Bids with the document.
15. Time for Commencement and Completion
15.1 Unless otherwise specified in the Special Provisions, the contractor must:
(a) commence the work within 30 days after the award of the contract by the Cit
y Council, but not before fully complying with Sections 13 and 14 above; and
(b) diligently prosecute the work to completion within the allowed number of working days specified on Page 1 of the Bid Proposal, counting from the start date given in the Notice to Proceed.
15.2 Upon written request of the Contractor and if approved in writing by the City Engineer, the time for commencement, completion or both may be extended.
(8-2023)
INSTRUCTIONS TO BIDDERS
- 10 -
16. Bid Protest
16.1 Any protest of any bid must be submitted in writing to the Office of the City Clerk by email to [email protected] or by facsimile transmission to 805 -388 -5318 no later than 5:00 PM on the seventh calendar day following the date of the bid opening.
16.2 The
protest must contain a complete statement of the factual basis for the protest and copies of pertinent documents.
16.3 The protest must identify the specific portion of the document and the specific statute, if any, that forms the basis for the protest. The protest must include the name, mailing address, email address and telephone number of the person representing the protesting party.
16.4 The party filing the protest must have actually submitted a bid for the Project. A subcontractor of a party filing a bid for the Project may not submit a bid protest. A party may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest.
16.5 The procedure and time limits set forth in these Instructions to Bidders are mandatory and are the bidders’ sole and exclusive remedy in the event of a bid protest. Any bidder’s failure to fully comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing of a challenge of the award pursuant to the Public Contract Code, filing of a claim pursuant to the Government Code, or filing of any other legal proceedings.
16.6 The City Director of Public Works , or designee, will review all timely protests prior to award of the Project and will recommend that the City Council either reject the protest and award to the lowest responsible and responsive bidder or accept the protest and award the bid to the next lowest responsible and responsive bidder.
17. Liquidated Damages
The amount of liquidated damages for each calendar day , is set forth on page 1 of the Bid Proposal, in accordance with Section 6.5 of the General Conditions/Specifications.
18. Survey Data
18.1 Electronic survey data will not be made available to the bidder as part of the bid process and no such data should be relied upon for the purposes of preparing the bid.
Survey data desired by bidders should be obtained in the field by the bidder. Permits for survey work may be necessary.
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 1 -
CITY OF CAMARILLO
DEPARTMENT OF PUBLIC WORKS
BID PROPOSAL
FOR
ADVANCED METERING INFRASTRUCTURE -
PROJECT NO. WT-5080
In and for the
CITY OF CAMARILLO, CALIFORNIA
Project Number WT-5080.
Completion Time:
Base Bid: Two-Hundred Sixty (260) Working Days
Additive Alternative Bid 1: Two-Hundred Sixty (260) Working Days starting July 1, 2025 Additive Alternative Bid 2: One-Hundred Thirty (130) Working Days starting July 1, 2026
Bids To Be Received:
3:00 p.m. on June 27, 2024__
Liquidated Damages: P
roject Complete: $2,000 Per Calendar Day
Name of Contractor
Address
Telephone
State Contractor’s License Number
Department of Industrial Relations Registration Number
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 2 -
BID PROPOSAL
WORK IDENTIFICATION:
NAME AND ADDRESS OF BIDDER:
Before awarding a bid, City will verify that bidder was properly licensed in accordance with Business and Professions Code sections 7000 and following. City will also verify that bidder that (along with all subcontractors listed) are currently registered and qualified to perform public work pursuant to Labor Code section 1725.5; provided, however, that if a bidder is a joint venture (Business & Professions Code §7029.1) or if federal funds are involved in the project, then City may accept a non-complying bid provided that the bidder and all listed subcontractors are registered at the time the contract is awarded. Bidder acknowledges that if the bidder is not properly licensed or registered at the time the bid is awarded or as otherwise required by law, the bid will be considered non-responsive and will be rejected.
1. Proposal
(a) Bidder has examined copies of all of the Contract Documents, including without limitation the document wherein each of the other Contract Documents is identified, and accepts all of the terms and conditions of the Contract Documents.
(b) Bidder proposes and agrees, if this bid is accepted, to enter into an agreement with City in the form included in the Contract Documents to complete all work as specified in the Contract for the contract price and within the contract time indicated in this bid and in accordance with the Contract Documents.
(c) This bid will remain open and not be withdrawn for the period specified in the Instructions to Bidders. If awarded the bid, bidder will sign the Contract and submit the bonds, certificates and other documents required by the Contract Documents within 10 days after the date of the Notice of Award of Contract.
(d) Bidder has examined the site and locality where the work is to be performed and the legal requirements and conditions affecting the cost, progress and performance of the work in strict accordance with the Contract Documents.
2. Payroll and Compliance Reports
Each contractor and subcontractor must keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by the contractor or subcontractor in connection with the public work. Such records must be certified and made available for inspection at all reasonable hours at the principal place of the contractor as required by Labor (5-2023) Project No. __WT-5080___
BID PROPOSAL
- 3 -
Code section 1776. In the case of state funded public works projects, certified payroll reports must be provided to City on a weekly basis. In the case of federally-funded public works project and in accordance with 29 C.F.R. § 5.5(a)(3), bidder agrees to furnish to City weekly payroll reports and weekly compliance statements for all labor used on this project.
3. Bid
If the Contract Documents include a Unit Price List, bidder acknowledges that the total bid sum shown on the Bid Schedule(s) and the estimated quantities and amounts shown on the Unit Price List are for purposes of comparison of bids only. Bidder also acknowledges that City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work as may be deemed necessary or expedient by the City and that final payment will be made at the unit prices bid, upon the basis of actual measured quantities as determined by the City Engineer or his/her designee.
Bidder acknowledges that the total Bid Schedule(s) and all sums shown on any Unit Price List attached thereto, includes (i) all labor, materials, tools, equipment and services and all taxes, insurance, other general expenses, overhead and profit and (ii) all trenching, backfilling, grading, excavation and fill, resurfacing of every character, grubbing and clearing and removal of all obstructions necessary for the doing of the work, the preservation of existing structures, shrubs, and trees, where required, and the shoring, bridging and bracing required and incident to the doing of the work, together with all fittings and joints, of every character, connected in place, area clean- up, traffic protection, and the reconstruction and severances required in the doing of the work.
Items for which quantities are indicated as “Lump Sum,” “L.S.,” “job” or words of like import will be paid for at the price named. Such payment will be full compensation for the work named and all work appurtenant thereto required by the contract that is not specifically provided for by other pay items.
4. Schedule
Bidder understands that tim ely completion is important to City. Therefore, time being of the essence, bidder proposes that the work will be commenced and will be completed as specified herein and in Section 15 of the Instructions to Bidders.
5. Addenda
Bidder acknowledges receipt of Addenda identified as:
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 4 -
6. Bidder Information
(a) Bidder has ________ years of experience as a contractor in construction work.
(b) Bidder has recently completed the three following construction works similar in character and magnitude to the work included in the bid in accordance with Section 3.6 of the Instructions to Bidders:
Class
Amount
Class
of Work
Date
Completed
Name/Address/Telephone # of Owner
7. Designation of Subcontractors
In compliance with the Subletting and Subcontracting Fair Practices Act, Public Contracts Code section 4100 and following, listed on page 5 is each subcontractor who will perform work or labor or render service to the bidder in or about the construction of the work or will specifically fabricate and install a portion of the work in an amount in excess of one half of one percent (0.5%) of the total bid sum or in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one- half of one percent (0.5%) of the total bid or $10,000, whichever is greater. (List only one subcontractor for each portion of the work as is defined by the bidder in this bid.) No other subcontractors may be used other than those specified without written approval of the City Engineer ; such approval will be made upon showing by the contractor of good and sufficient cause.
Failure to specify a subcontractor or specifying more than one subcontractor for the same portion of work to be performed under the contract in excess of one- half of one percent (0.5%) of the total bid constitutes an agreement that the contractor is fully qualified and will perform that portion of the work. Any contractor who subcontracts for any portion of work not set forth herein, except as otherwise provided by Public Contract Code sections 4107 or 4109, will be subject to the penalties set forth in Public Contract Code sections 4110 and 4111.
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 5 -
PROPOSAL
LIST OF SUBCONTRACTORS
WORK IDENTIFICATION: ________________
NAME AND ADDRESS OF BIDDER:
Completion of this form must comply with Section 7 of the Bid Proposal.
Name/Address/State License
Number of Subcontractor
Department of Industrial
Relations Registration
Number*
Items of Work
Portion of Work
(% of Contract Price)
% of Total Contract
Price by Subcontract
% of Total Contract
Price by Contractor
*Pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720 including section 1725.5) of the Labor Code
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 6 -
8. Attachments
The following documents, signed in accordance with Section 13 of the Instructions to Bidders, are attached to, and made a part of, this Bid Proposal:
(a) N
oncollusion Declaration, as required by Public Contract Code section 7106 and made a part of this Bid Proposal.
(b) Required Bidder’s Security in the form of
(c) Unit Price List, if required
(d) Federal Certificate, if required
(e) Other pertinent Documents (list here and attach to this bid)
Dated this __________ day of ____________________, 20____. (5-2023) Project No. __WT-5080___
BID PROPOSAL
- 7 -
If BIDDER is:
An Individual
By:
(Print Individual’s Name)
doing business as
Business Address:
Telephone Number:
Signature
A Partnership
(Firm Name)
By:
(Print General Partner’s Name)
(Title)
Business Address:
Telephone Number:
Signature
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 8 -
A Corporation
(Corporation Name)
(State of Incorporation)
By:
(Print Name and Title of Person Authorized to Sign)
(Corporate Seal)
Signature
Attest:
(Secretary)
Business Address:
Telephone Number:
Signature
A Joint Venture
By:
(Print Name)
(Address and Telephone Number)
By:
(Print Name)
(Address and Telephone Number)
Signature
Signature
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 9 -
NONCOLLUSION DECLARATION
TO BE EXECUTED BY BIDDER
AND SUBMITTED WITH BID
The undersigned declares:
I am the _________________ of ______________, the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham.
The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Executed this ________ day of ___________________, 20___, at _____________________, California.
Firm (print or type) Signature
(5-2023) Project No. __WT-5080___
BID SCHEDULE
UNIT PRICE LIST -- FIGURES
WORK IDENTIFICATION ADVANCED METERING INFRASTRUCTURE – PROJECT NO. WT-5080
NAME OF BIDDER:
BID PROPOSAL
- 10a -
BASE BID – Year 1 FY 24/25
Item
No. Item Description Quantity Unit
Payment
Reference
Unit Price
in Figures
*Item Total
Price in
Figures
1 Mobilization/ Demobilization 1 LS 2005-1
2 Storm Water Pollution Control Program 1 LS 2005-1
3 AMI Network Devices and Software 1 LS 2005-1
4 3/4-Inch Meter Installation 7392 EA 2005-1
5 1-Inch Meter Installation 493 EA 2005-1
6 Meter Retrofit Installation 2405 EA 2005-1
7 3/4-Inch Stock Meter 120 EA 2005-1
8 1-Inch Stock Meter 16 EA 2005-1
9 1 1/2-Inch Stock Meter 4 EA 2005-1
10 2-Inch Stock Meter 6 EA 2005-1
11 3-Inch Stock Meter 2 EA 2005-1
12 4-Inch Stock Meter 2 EA 2005-1
13 6-Inch Stock Meter 2 EA 2005-1
14 Curb and Gutter Removal and Replacement,
complete in place 20 EA 2005-2
15 Water Meter Box 36, complete in place 200 EA 2005-2
16 Water Meter Box 37, complete in place 200 EA 2005-2
(5-2023) Project No. __WT-5080___
BID SCHEDULE
UNIT PRICE LIST -- FIGURES
WORK IDENTIFICATION ADVANCED METERING INFRASTRUCTURE – PROJECT NO. WT-5080
NAME OF BIDDER:
BID PROPOSAL
- 10b -
17 Water Meter Box 3 Lid, complete in place 1495 EA 2005-2
18 Water Meter Box 33 Lid, complete in place 47 EA 2005-2
19 Water Meter Box 36 Lid, complete in place 1138 EA 2005-2
20 Water Meter Box 37 Lid, complete in place 4618 EA 2005-2
21 Water Meter Box 38 Lid, complete in place 587 EA 2005-2
22 Sidewalk Removal and Replacement,
complete in place 500 SF 2005-2
23 Curb and Gutter Removal and Replacement,
complete in place 100 LF 2005-2
24 Driveway Removal and Replacement (asphalt
or concrete) complete in place 1000 SF 2005-2
25 Misc. Concrete Removal and Replacement,
complete in place 9 CY 2005-2
26 Seeding and Mulching 200 SF 2005-2
27 ¾-inch & 1-inch Meter adjustments reusing
existing materials, with new elbows 20 EA 2005-2
TOTA L BASE BID – Year 1 FY 24/25 $
(5-2023) Project No. __WT-5080___
BID SCHEDULE
UNIT PRICE LIST -- FIGURES
WORK IDENTIFICATION ADVANCED METERING INFRASTRUCTURE – PROJECT NO. WT-5080
NAME OF BIDDER:
BID PROPOSAL
- 10c -
ADDITIVE ALTERNATE BID 1 – Year 2 FY 25/26
Item
No. Item Description Quantity Unit
Payment
Reference
Unit Price
in Figures
*Item Total
Price in
Figures
28 Re-Mobilization/ Demobilization 1 LS 2005-1
29 3/4-Inch Meter Installation 3106 EA 2005-1
30 1 1/2-Inch Meter Installation 247 EA 2005-1
31 2-Inch Meter Installation 101 EA 2005-1
32 Water Meter Box 36, complete in place 100 EA 2005-2
33 Water Meter Box 37, complete in place 100 EA 2005-2
34 Water Meter Box 3 Lid, complete in place 351 EA 2005-2
35 Water Meter Box 33 Lid, complete in place 3 EA 2005-2
36 Water Meter Box 36 Lid, complete in place 994 EA 2005-2
37 Water Meter Box 37 Lid, complete in place 1697 EA 2005-2
38 Water Meter Box 38 Lid, complete in place 61 EA 2005-2
39 Water Meter Box 65 Lid, complete in place 20 EA 2005-2
40 Water Meter Box 66 Lid, complete in place 118 EA 2005-2
41 Water Meter Box 67 Lid, complete in place 200 EA 2005-2
42 Water Meter Box 68 Lid, complete in place 10 EA 2005-2
43 Sidewalk Removal and Replacement,
complete in place 500 SF 2005-2
(5-2023) Project No. __WT-5080___
BID SCHEDULE
UNIT PRICE LIST -- FIGURES
WORK IDENTIFICATION ADVANCED METERING INFRASTRUCTURE – PROJECT NO. WT-5080
NAME OF BIDDER:
BID PROPOSAL
- 10d -
44 Curb and Gutter Removal and Replacement,
complete in place 100 LF 2005-2
45 Driveway Removal and Replacement (asphalt
or concrete) complete in place 1000 SF 2005-2
46 Misc. Concrete Removal and Replacement,
complete in place 9 CY 2005-2
47 Seeding and Mulching 200 SF 2005-2
48 3/4-inch & 1-inch Meter adjustments reusing
existing materials, with new elbows 20 EA 2005-2
49 Hourly Rate for on-call services for >1-inch
meters 320 HR 2005-2
TO TAL ADDITIVE ALTERNATE BID 1 – Year 1 FY 25/26 $
ADDITIVE AL TERNATE BID 2 – Year 3 7/1/2026 to 12/31/2026 Item
No. Item Description Quantity Unit
Payment
Reference
Unit Price
in Figures
*Item Total
Price in
Figures
50 Re-Mobilization/ Demobilization 1 LS 2005-1
51 2-Inch Meter Installation 285 EA 2005-1
52 3-Inch Meter Installation 30 EA 2005-1
53 4-Inch Meter Installation 10 EA 2005-1
54 6-Inch Meter Installation 9 EA 2005-1
55 Water Meter Box 66, complete in place 50 EA 2005-2
56 Water Meter Box 66 Lid, complete in place 77 EA 2005-2
57 Water Meter Box 67 Lid, complete in place 90 EA 2005-2
(5-2023) Project No. __WT-5080___
BID SCHEDULE
UNIT PRICE LIST -- FIGURES
WORK IDENTIFICATION ADVANCED METERING INFRASTRUCTURE – PROJECT NO. WT-5080
NAME OF BIDDER:
BID PROPOSAL
- 10e -
58 Water Meter Box 68 Lid, complete in place 118 EA 2005-2
59 Sidewalk Removal and Replacement,
complete in place 500 SF 2005-2
60 Curb and Gutter Removal and Replacement,
complete in place 100 LF 2005-2
61 Driveway Removal and Replacement (asphalt
or concrete) complete in place 1000 SF 2005-2
62 Misc. Concrete Removal and Replacement,
complete in place 9 CY 2005-2
63 Seeding and Mulching 200 SF 2005-2
64 Hourly Rate for on-call services for >1-inch
meters 320 HR 2005-2
TOTA L ADDITIVE ALTERNATE BID 2 – Year 3 7/1/2026 to 12/31/2026 $
SUMMARY OF BID SCHEDULE
TOTAL BASE BID ............................................................................ $
TOTAL ADDIT
IVE ALTERNATE BID 1 ........................................... $
TOTAL ADDIT
IVE ALTERNATE BID 2 ........................................... $
TOTAL OF BASE BID, ADDITIVE ALTERNATE BID 1,
AND ADDITIVE ALTERNATE BID 2
................................................ $
NOTE: Pursuant to Public Contract Code section 20103.8, the City of C amarillo will determine the lowest bid based on the total of the Base Bid, Additive Alternate Bid 1, and Additive Alternate Bid
2. The City of Camarillo reserves the right to add any combination of Additive Alternate Bid 1 and Additive Alternate Bid 2. Bidder must bid on all Additive Alternate Bids. Bids that do not include all Additive Alternate Bids will not be accepted.
*NOTE: In case of error in extension of price into the total price column, the unit price will govern. (5-2023) Project No. __WT-5080___
BID PROPOSAL
- 11 -
BIDDER’S INFORMATION CERTIFICATION
Bidder certifies that the following information is true and correct:
Bidder’s Name
Business Address
Telephone
State Contractor’s License No. and Class
Original Date Issued Expiration Date
The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, or corporate officers having a principal interest in this bid:
The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this bid are as follows:
All current and prior DBAs, alias, and/or fictitious business names for any principal having an interest in this bid are as follows:
I declare under penalty of perjury under the laws of the State of California that the above representations are true and correct.
Executed this ________ day of ___________________, 20___, at _____________________, California.
Signature and Title of Authorized Official
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 12 -
DECLARATION OF ELIGIBILITY TO CONTRACT
The undersigned, a duly authorized representative of the bidder, certifies and declares that:
1. The bidder is aware of Labor Code sections 1771.1 and 1777.7, which prohibit a contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.
2. T he bidder is currently registered and qualified to perform public work pursuant to Labor Code section 1725.5 and is not prohibited from bidding on, being awarded, or performing work as a contractor or subcontractor on a public works project under Labor Code sections 1771.1 and 1777.7, or any other provision of law; provided, however, that if a bidder is a joint venture (Business & Professions Code § 7029.1) or if federal funds are involved in the project, then City may accept a non- complying bid provided that the bidder and all listed subcontractors are registered at the time the contract is awarded.
3. The bidder is aware of Public Contract Code section 6109, which states:
(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code. (b) Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract, and any public money that may have been paid to a debarred subcontractor by a contractor on the project will be returned to the awarding body. The contractor is responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.
4. The bidder has investigated the eligibility of each and every subcontractor that bidder intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontractor on a public works project by virtue of Public Contract Code section 6109, Labor Code sections 1725.5, 1771.1 and 1777.7, or any other provision of law.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Executed this ________ day of ___________________, 20___, at ______________________, California.
Signature and Title of Authorized Official
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 13 -
BID BOND
(not necessary when certified check or cash accompanies bid)
PROJECT TITLE: ___________________
WHEREAS,
(“Contractor”) intends to submit a bid to the City of Camarillo, California, a municipal corporation (“City”), for the work identified as follows:
NOW, THEREFORE, we, the Contractor, as Principal, and
,
a corporation organized and existing under the laws of the State of and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bond unto City in the sum of
dollars ($ )
lawful money of the United States of America, such sum being not less than ten percent (10%) of the bid amount for the payment of which sum to be made, the Principal and Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if City accepts the bid of the Principal and enters into a contract in accordance with the terms of the bid, the Principal must give the bonds, certificates and other documents as required by the Notice Inviting Bids or the other contract documents. In the event Principal fails to enter into such contract or provide the bonds, certificates or other documents, City may apply this security to the difference between the low bid and the next lowest bidder with whom City contracts to perform the work covered by the bid; the surplus, if any, will be returned to Surety. In case suit is brought upon this bond, the court will fix and award and the Surety must pay, in addition to the face amount hereof, all costs and reasonable attorney’s fees incurred by City in successfully enforcing the obligations of this bond.
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 14 -
IN WITNESS THEREOF, we have hereunto set our hands and seals this day of , 20 .
(affix seal below) [PRINCIPAL]
By
Title
(affix seal below) [SURETY]
By
Title
Address
[P.C.C. §§ 20170, 20171]
* ALL SIGNATURES ON THIS BID BOND MUST BE NOTARIZED USING APPROPRIATE 8 ½” x 11” NOTARY ACKNOWLEDGEMENT FORM.
** Corporations must affix corporate seal.
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 15 -
CERTIFICATION FOR CONTRACTS,
GRANTS, AND COOPERATIVE AGREEMENTS
(Federal Fiscal Year October 1, 20____, to September 30, 20____)
I, ,
(Name and Title of Grantee Official)
hereby certify on behalf of th
at
(Name of Grantee)
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an office or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned must complete and submit Standard Form -LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U. S. Code. Any person who fails to file the required certification will be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
Executed this __________ day of __________________, 20____.
By:
(Signature of Authorized Official)
(Title of Authorized Official)
(5-2023) Project No. __WT-5080___
BID PROPOSAL
- 16 -
CERTIFICATION REGARDING DEPARTMENT OF INDUSTRIAL
RELATIONS CONTRACTOR / SUBCONTRACTOR REGISTRATION
By my signature hereunder, as the Contractor, I certify that Contractor, and all Subcontractors listed on the “List of Subcontractors” are registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
Contractor’s Department of Industrial Relations registration number is _____________.
Subcontractors’ Department of Industrial Relations registration numbers are as indicated in the Subcontractors List.
Executed this __________ day of __________________, 20____.
By:
(Signature of Authorized Official)
(Title of Authorized Official)
Project No. __WT-5080___
STATE OF CALIFORNIA – DEPARTMENT OF INDUSTRIAL RELATIONS
FORMS MUST BE COMPLETED AND SUBMITTED FOR BID PROPOSAL
WITHIN NO LATER THAN 4:00 P.M. (LOCAL TIME) ON FOURTH BUSINESS
DAY AFTER BID OPENING
• Submit State of California DIR-PWC 100 form
STATE OF CALIFORNIA – DEPARTMENT OF INDUSTRIAL RELATIONS TO: California Department of Industrial Relations
Division of Apprenticeship Standards
P.O. Box 420603
San Francisco, CA 94142
FROM:
AWARDING AGENCY ID NUMBER:
If you do not have an ID number please contact DAS
EXTRACT OF
PUBLIC WORKS CONTRACT AWARD
A CONTRACT TO PERFORM PUBLIC WORKS UNDER LABOR CODE SECTION 1777.5 HAS BEEN AWARDED TO:
1. NAME OF GENERAL CONTRACTOR 2. CONTRACTOR’S LICENSE NO
3. MAILING ADDRESS (STREET NUMBER OR P.O. BOX) 4. CITY
5. ZIP CODE 6. TELEPHONE NUMBER
7. GENERAL CONTRACTOR’S CONTACT EMAIL ADDRESS 8.ADDRESS/LOCATION OF PUBLIC WORKS SITE (INCLUDE CITY AND COUNTY):
8a. County
9. NAME OF PROJECT
10. CONTRACT NUMBER 11. PROJECT NUMBER 12. DOLLAR AMOUNT OF CONTRACT AWARD
13. FIRST ADVERTISED BID DATE
MONTH DAY YEAR
14 CONTRACT AWARD DATE
MONTH DAY YEAR
12a ESTIMATED TOTAL PROJECT COSTS, IF DIFFERENT FROM
ITEM 12 (see instructions).
15. WHICH STATUTE, IF ANY, APPLIES TO THIS PROJECT?
16. STATE CONSTRUCTION BONDS YES NO
If YES, List the Sources and Dollar Amount of Bond Proceeds:
SOURCES DOLLAR AMOUNT
17. WILL YOU OPERATE A DIR-APPROVED LABOR COMPLIANCE
PROGRAM (LCP) FOR THIS PROJECT?
YES NO
18. IS THERE A PROJECT LABOR AGREEMENT (PLA) ASSOCIATED WITH THIS PROJECT? If yes, please email a copy to [email protected] YES NO
19. STARTING DATE (ESTIMATED OR ACTUAL)
(MM/DD/YYYY)
20. COMPLETION DATE (ESTIMATED OR ACTUAL)
(MM/DD/YYYY)
21. BRIEF DESCRIPTION OF WORK TO BE PERFORMED 22.
NEW CONSTRUCTION REMODELING
ALTERATION, DEMOLITION, REPAIR OR MAINTENANCE
23. CLASSIFICATION OR TYPE OF WORKER (CARPENTER, PLUMBER, ETC.) THAT WILL BE EMPLOYED BY THE CONTRACTOR(S) Please list Sub-contractors and their worker classifications on page 2
24. Is language included in the Contract Award to effectuate the requirements of sections 1771, 1774, 1775, 1776, 1777.5, 1813, and 1815 of the Labor Code? YES NO
25. SIGNATURE 26.TITLE 27.DATE
28. PRINTED OR TYPED NAME 29.E-MAIL ADDRESS 30.TELEPHONE NUMBERS If different from above, name, title, and contact information of person responsible for carrying out Awarding Body’s LCP or CMU responsibilities.
31. NAME 32.TITLE 33. E-MAIL ADDRESS 34. TELEPHONE NUMBER
Duplication of this form is permissible
DIR-PWC 100 (rev. 10/11) successor to the DAS 13 form
EXTRACT OF PUBLIC WORKS CONTRACT AWARD (Continued)
Listing of Sub Contractors
Con. Lic. # Contractor Classification of workers
DIR-PWC 100 (rev. 10/11) successor to the DAS 13 form
(12-2023) Project No. __WT-5080___
CONTRACT
CITY OF CAMARILLO
PUBLIC WORKS CONTRACT
This contract (“Contract”) is effective as of __________________________, and is between the C ITY OF C AMARILLO, a California general law city and municipal corporation (“City”), a nd ____________________________________, a corporation/partnership/limited liability company (“Contractor”), collectively referred to as the “Parties.” Section 1. Reci tals. This Contract is entered into with respect to the following facts:
1.1 City noticed and received bids for the work involved in Advanced Metering Infrastructure – Project No. WT-5080 (“Project”), which is more fully described in the Contract Documents.
1.2 The City Council o f City determined that Contractor was the lowest responsive bidder and awarded to Contractor the bid.
1.3 Contractor has represented it is qualified to perform all of the work required to complete the Project.
1.4 Contractor has agreed to perform all such work in the time and manner set forth in the Contract Documents.
1.5 The City Council of City has determined that the public interest, convenience and necessity require the execution of this Contract and its implementation.
Section 2. Cont
ract Documents . This Contract consists of the following documents (“Contract Documents”), all of which are made a part of this Contract:
2.1 Notice Inviting Bids
2. 2 Instructions to Bidders
2.3 Bid Proposal, as accepted, including the Certificate of Bidders’ Experience and Qualifications and the List of Subcontractors
2.4 Notice of Award
2.5 Notice to Proceed
2.6 This Contract
2.7 Verification of California Contractor’s License
2.8 Contractor’s Certificate Regarding Workers’ Compensation
2.9 Security for payment (labor and materials)
2.10 Security for performance
(12-2023) Project No. __WT-5080___
CONTRACT
2.11 Certificate(s) of Insurance
2.12 General Conditions/Specifications
2.13 Special Provisions
2.14 Plans and Standard Drawings
2.15 Prevailing Wage Scales
2.16 S. S. P. W. C.
2.17 Addenda Nos.
2.18 Other documents (list here)
Exhibit A – Co mpensation
Exhibit B – Insurance
Section 3. The Work.
3.1 The work (“Work”) to be performed by Contractor is described in the Contract Documents.
3.2 In completing the Work, Contractor must employ, at a minimum, the applicable generally accepted professional standards of its industry in existence at the time of performance as utilized by persons engaging in similar work.
3.3 Except as specifically provided in the Contract Documents, Contractor must furnish, at its sole expense, all of the labor, materials, tools, equipment, services and transportation necessary to perform all of the Work.
3.4 Contractor must perform all of the Work in strict accordance with the Contract Documents.
Section 4. Ti
me to Perform the Work.
4.1 Time is of the essence with respect to Contractor’s Work. Contractor agrees to diligently pursue performance of the Work within the time specified by the Contract Documents.
4.2 Contractor will be excused from any delay in performance or failure to perform due to causes beyond the control of Contractor. Such causes include, but are not limited to, acts of God, acts of terrorism, acts of federal, state or local governments, acts of City, court orders, fires, floods, epidemics, strikes, embargoes, and unusually severe weather.
(12-2023) Project No. __WT-5080___
CONTRACT
4.3 If Contractor is delayed by any cause beyond Contractor’s control, City may, but is not required to, grant a time extension for the completion of the Work. If delay occurs, Contractor must notify City in writing within 48 hours of the cause and the extent of the delay and how such delay interferes with Contractor’s performance of the Work.
Section 5. Com
pensation and Payment.
5.1 Subject to any limitations provided in the Contract Documents, City agrees to pay Contractor as full consideration for the faithful performance of all of the Work the compensation set forth in Exhibit A (“Compensation”), which is made a part of this Contract.
5.2 Contractor must furnish Cit y with a Pay Estimate for the Work performed in accordance with the Contract Documents. Contractor may not submit a Pay Estimate more often than once every 30 days.
5.3 City will review each Pay Estimate and determine whether the Work performed is in accordance with the Contract Documents. The Director of Public Works (“Director”) m ay require Contractor to provide a release of all undisputed Contract amounts contained in the Pay Estimate.
5.4 If City disputes any item on a Pay Estimate , City will give Contractor notice stating the reasons for the dispute. The Parties will meet and confer in good faith to attempt to resolve the dispute.
5.5 Except as to any charges for the Work performed that City disputes and the City’s standard five-percent retention of the approved progress payment, City will cause Contractor to be paid within 30 days of the date of the invoice or the date that Contractor furnishes City with a release of all undisputed Contract amounts, whichever occurs later. Federally funded projects will not have a five -percent retention.
5.6 In the event there is any claim specifically excluded by Contractor from the operation of any release, City may retain an amount not to exceed the amount of the excluded claim.
Section 6. Labor
Code and Prevailing Wage Requirements.
6.1 Contractor agrees to comply with the requirements of California Labor Code sections 1810 through 1815. Eight hours of labor constitutes a legal day’s work per Labor Code s ection 1810. Contractor will forfeit the statutory penalty to City for each worker employed in the execution of this Contract by Contractor or any subcontractor for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Labor Code sections 1810 through 1815.
6.2 Copies of the determination of the Director of the Department of Industrial Relations of the prevailing rate of per diem wages for each craft, classification or (12-2023) Project No. __WT-5080___
CONTRACT
type of worker needed to execute this Contract are available for download from the State website: http://www.dir.ca.gov/OPRL/dprewagedetermination.htm.
6.3 Contractor must post at the work site, or if there is no regular work site then at its principal office, for the duration of the Contract, a copy of the determination by the Director of the Department of Industrial Relations of the specified prevailing rate of per diem wages. (Labor Code § 1773.2.) When applicable, copies of the prevailing rate of per diem wages will be on file at City’s Department of Public Works and available to Contractor and any other interested party upon request.
6.4 Contractor, and any subcontractor engaged by Contractor, may pay not less than the specified prevailing rate of per diem wages to all workers employed in the execution of the contract. (Labor Code § 1774.) Contractor is responsible for compliance with Labor Code section 1776 relative to the retention and inspection of payroll records.
6.5 Contractor must comply with all provisions of Labor Code section 1775. Under Section 1775, Contractor will forfeit the statutory penalty to City for each worker employed in the execution of the Contract by Contractor or any subcontractor for each calendar day, or portion thereof, in which the worker is paid less than the prevailing rates. Contractor may also be liable to pay the difference between the prevailing wage rates and the amount paid to each worker for each calendar day, or portion thereof, for which each worker was paid less than the prevailing wage rate.
6.6 Nothing in this Contract prevents Contractor or any subcontractor from employing properly registered apprentices in the execution of the Contract. Contractor is responsible for compliance with Labor Code section 1777.5 for all apprenticeable occupations. This statute requires that contractors and subcontractors must submit contract award information to the applicable joint apprenticeship committee, must employ apprentices in apprenticeable occupations in a ratio of not less than one hour of apprentice’s work for every five hours of labor performed by a journeyman (unless an exception is granted under § 1777.5), must contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council, and that contractors and subcontractors must not discriminate among otherwise qualified employees as apprentices solely on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices defined in Labor Code section 3077, who are in training under apprenticeship standards and who have written apprentice contracts, may be employed on public works in apprenticeable occupations.
6.7 Contractor has reviewed and agrees to comply with any applicable provisions for any public work subject to Department of Industrial Relations (DIR) Monitoring and Enforcement of prevailing wages, including the registration requirements of Labor Code Section 1771.1(a). City hereby notifies Contractor that Contractor is responsible for submitting certified payroll records directly to the State Compliance Monitoring Unit (CMU). For further information concerning compliance monitoring please visit the website location at:
http://www.dir.ca.gov/dlse/cmu/cmu.html.
(12-2023) Project No. __WT-5080___
CONTRACT
6.8 Contractor must comply with Labor Code section 1771.1(a), which provides that Contractor may award any contracts and subcontracts for work that qualifies as a “public work” only to subcontractors which are at that time registered and qualified to perform public work pursuant to Labor Code S ection 1725.5.
Contractor must obtain proof of such registration from all such subcontractors.”
6.9 If federal funds are used to pay for the Work, Contractor and any subcontractor agree to comply, as applicable, with the labor and reporting requirements of the Davis-Bacon Act (40 USC § 276a-7), the Copeland Act (40 USC § 276c and 18 USC §874), and the Contract Work Hours and Safety Standards Act (40 USC § 327 and following).
Section 7. Non-D
iscrimination. Contractor, its officers, agents, employees, and subcontractors may not discriminate in the employment of persons to perform the Work in violation of any federal or state law prohibiting discrimination in employment, including based on the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, of any person, except as provided under California Government Code section 12940. Contractor is responsible for compliance with this section.
Section 8. Genera
l Legal Compliance.
8.1 In performing the Work, Contractor must comply with all applicable statutes, laws and regulations, including, but not limited to, OSHA requirements and the Camarillo Municipal Code.
8.2 Contractor must, at Contractor’s sole expense, obtain all necessary permits and licenses required for the Work, and give all necessary notices and pay all fees and taxes required by law, including, without limitation, any business license tax imposed by City. Contractor is exempt from any City encroachment permit fee pursuant to Camarillo Municipal Code Section 13.04.020.
8.3 Contractor must maintain a valid California Contractor’s License throughout the term of this Contract.
Section 9. Cl
ayton and Cartwright Act Assignments. In entering into this Contract or a contract with a subcontractor to supply goods, services, or materials pursuant to this Contract for the Project, Contractor and any subcontractor will be deemed to have offered and agreed to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700 of Part 2 of Division 7 of the California Business and Professions Code), arising from purchases of goods, services, or materials for the Project. This assignment will be deemed made and will become effective at the time City tenders final payment to Contractor, without further acknowledgement by the Parties.
Section 10. Independent
Contractor. Contractor is and will at all times remain as to City a wholly independent contractor. Neither City nor any of its officers, employees, or (12-2023) Project No. __WT-5080___
CONTRACT
agents will have control over the conduct of Contractor or any of Contractor’s officers, employees, agents or subcontractors, except as expressly set forth in the Contract Documents. Contractor may not at any time or in any manner represent that it or any of its officers, employees, agents, or subcontractors are in any manner officers, employees, agents or subcontractors of City.
Section 11. Indem nification.
11.1 Contractor agrees to the fullest extent permitted by law to (1) immediately defend and (2) indemnify City from and against, any and all claims and liabilities, regardless of the nature or type, that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Contractor, or its officers, employees, agents, or subcontractors committed in performing any Work under this Contract or the failure to comply with any of the obligations of this Contract (collectively, “Claims”). The Claims subject to Contractor’s duties to defend and indemnify include, without limitation, all claims, actions, causes of action, proceedings, suits, losses, damages, penalties, fines, judgments, liens, levies, and associated investigation and administrative expenses. Such Claims also include defense costs, including reasonable attorneys’ fees and disbursements, expert fees, court costs, and costs of alternative dispute resolution.
11.2 Contractor’s duty to defend is a separate and distinct obligation from Contractor’s duty to indemnify. Contractor is obligated to defend City in all legal, equitable, administrative, or special proceedings, with counsel approved by City, immediately upon tender to Contractor of the Claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Contractor are responsible for the Claim does not relieve Contractor from its separate and distinct obligation to defend under this section. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Contractor asserts that liability is caused in whole or in part by the negligence or willful misconduct of any City indemnified party. If it is finally adjudicated that liability was caused by the comparative active negligence or willful misconduct of any City indemnified party, then Contractor may submit a claim to City for reimbursement of reasonable attorneys’ fees and defense costs in proportion to the established comparative liability of the City indemnified party.
11.3 Contractor agrees that its defense and indemnification obligation under this section, includes the reasonable costs of attorneys’ fees incurred by the City Attorney’s office to monitor and consult with Contractor regarding the defense of any Claims, including providing direction with regard to strategy, preparation of pleadings, settlement discussions, and attendance at court hearings, mediations, or other litigation related appearances. City will use its best efforts to avoid duplicative attorney work or appearances in order to keep defense costs to a reasonable minimum.
11.4 Contractor agrees that settlement of any Claim will require the consent of City.
City agrees that its consent will not be unreasonably withheld provided that Contractor is financially able (based on demonstrated assets) to fulfill its (12-2023) Project No. __WT-5080___
CONTRACT
obligation to indemnify City for the costs of any such settlement as required under this Contract.
11.5 Contractor’s obligation to indemnify City applies unless it is finally adjudicated that the liability was caused by the sole active negligence or sole willful misconduct of a City indemnified party. If a Claim is finally adjudicated and a determination made that liability was caused by the sole active negligence or sole willful misconduct of a City indemnified party, then Contractor’s indemnification obligation will be reduced in proportion to the established comparative liability.
11.6 For the purposes of this section, “ City” includes City’s officers, officials, employees and agents.
11.7 The provisions of this section will survive the expiration or earlier termination of this Contract .
Section 12. Insur
ance. Contractor agrees to have and maintain in full force and effect during the term of this Contract the insurance coverages listed in Exhibit B (“Insurance”), which is made a part of this Contract.
Section 13. Noti ce.
13.1 All written notices required or permitted to be given under this Contract will be deemed made when received by the other Party at its respective address as follows:
To City: C ity of Camarillo
601 Carmen Drive
Camarillo, California 93010
Attention: James Campero
(Tel.) 805-388-5340
(Fax) 805-388-5387
E-Mail [email protected]
To Contractor:
Attention:
(Tel.)
(Fax)
E-Mail
13.2 Notice will be deemed effective on the date personally delivered or transmitted by facsimile or email. If the notice is mailed, notice will be deemed given three days after deposit of the same in the custody of the United States Postal Service, postage prepaid, for first class delivery, or upon delivery if using a major courier service with tracking capabilities.
(12-2023) Project No. __WT-5080___
CONTRACT
13.3 Any Party may change its notice information by giving notice to the other Party in compliance with this section.
Section 14. Cit y Rights of Termination and to Complete the Work.
14.1 The occurrence of any of the following is a default by Contractor under this Contract:
14.1.1 Contractor refuses or fails to prosecute the Work or any part thereof with such diligence as will insure its completion within the time specified or any permitted extension.
14.1.2 Contractor fails to complete the Work on time.
14.1.3 Contractor is adjudged bankrupt, or makes a general assignment for the benefit of creditors, or a receiver is appointed on account of Contractor’s insolvency.
14.1.4 Contractor fails to supply enough properly skilled workers or proper materials to complete the Work in the time specified.
14.1.5 Contractor fails to make prompt payment to any subcontractor or for material or labor.
14.1.6 Contractor fails to abide by any applicable laws, ordinances or instructions of City in performing the Work.
14.1.7 Contractor breaches or fails to perform any obligation or duty under the Contract.
14.2 Upon the occurrence of a default by Contractor, City will serve a written notice of default on Contractor specifying the nature of the default and the steps needed to correct the default. Unless Contractor cures the default within 10 days after the service of such notice, or satisfactory arrangements acceptable to City for the correction or elimination of such default are made, as determined by City, City may thereafter terminate this Contract by serving written notice on Contractor. In such case, Contractor will not be entitled to receive any further payment, except for Work actually completed prior to such termination in accordance with the provisions of the Contract Documents.
14.3 If the Engineer determines that the default should be cured in less than 10 days, then the written notice of default served on the Contractor will specify the shorter deadline for the Contractor to cure the default.
14.4 In event of a termination of this Contract, the City will also immediately serve written notice of the termination upon Contractor’s surety. The surety will have the right to take over and perform pursuant to this Contract; provided, however, that if the surety does not give City written notice of its intention to take over and perform this Contract within five days after service of the notice of termination or does not commence performance within 10 days from the date of such notice, (12-2023) Project No. __WT-5080___
CONTRACT
City may take over the Work and prosecute the same to completion by contract or by any other method it may deem advisable for the account and at the expense of Contractor. Contractor and the surety will be liable to City for any and all excess costs or other damages incurred by City in completing the Work.
14.5 If City takes over the Work as provided in this Section, City may, without liability for so doing, take possession of, and utilize in completing the Work, such materials, appliances, plant, and other property belonging to Contractor as may be on the site of the Work and necessary for the completion of the Work.
14.6 If City takes over the Work, City may also take possession of outstanding materials on order for the completion of the project, upon payment to the vendor.
All excess costs incurred by City in obtaining such materials, will be the responsibility of the Contractor.
14.7 If the Contractor does not cure a default within the time period required, then in lieu of terminating of the Contract, the City, in its sole discretion, may take action to cure the default and all costs incurred by City to cure the default will be deducted from any amount otherwise due to the Contractor.
Section 15. Pr
oject Documents . All data, drawings, maps, models, notes, photographs, reports, studies and other documents (collectively, “Project Documents”) prepared, developed or discovered by Contractor in the course of performing any of the Work under this Contract will become the sole property of City. Upon the expiration or termination of this Contract, Contractor must turn over all original Project Documents to City in its possession, but may retain copies of any of the Project Documents it may desire.
Section 16. Genera
l Provisions.
16.1 Authority to Execute. Each Party represents and warrants that all necessary action has been taken by such Party to authorize the undersigned to execute this Contract and to bind it to the performance of its obligations.
16.2 Assignment. Contractor may not assign this Contract without the prior written consent of City, which consent may be withheld in City’s sole discretion since the experience and qualifications of Contractor were material considerations for this Contract.
16.3 Binding Effect. This Contract is binding upon the heirs, executors, administrators, successors and permitted assigns of the Parties.
16.4 Integrated Contract. This Contract, including the Contract Documents, is the entire, complete, final and exclusive expression of the Parties with respect to the Work to be performed under this Contract and supersedes all other agreements or understandings, whether oral or written, between Contractor and City prior to the execution of this Contract.
16.5 Modification of Contract. No amendment to or modification of this Contract will be valid unless made in writing and approved by Contractor and by the City (12-2023) Project No. __WT-5080___
CONTRACT
Council or City Manager, as applicable. The Parties agree that this requirement for written modifications cannot be waived and that any attempted waiver will be void.
16.6 Electronic Signatures; Counterparts. This Contract and any amendment will be considered executed when the signature page of a party is delivered by electronic transmission. Such electronic signatures will have the same effect as an original signature. The Contract may be executed in multiple counterparts.
16.7 Waiver. Waiver by any Party of any term, condition, or covenant of this Contract will not constitute a waiver of any other term, condition, or covenant. Waiver by any Party of any breach of the provisions of this Contract will not constitute a waiver of any other provision, or a waiver of any subsequent breach or violation of any provision of this Contract. Acceptance by City of any Work performed by Contractor will not constitute a waiver of any of the provisions of this Contract.
16.8 Interpretation. This Contract will be interpreted, construed and governed according to the laws of the State of California. Each party has had the opportunity to review this Contract with legal counsel. The Contract will be construed simply, as a whole, and in accordance with its fair meaning. It will not be interpreted strictly for or against either party.
16.9 Severability. If any term, condition or covenant of this Contract is declared or determined by any court of competent jurisdiction to be invalid, void or unenforceable, the remaining provisions of this Contract will not be affected and the Contract will be read and construed without the invalid, void or unenforceable provision.
16.10 Venue. In the event of litigation between the parties, venue in state trial courts will be in the County of Ventura. In the event of litigation in a U.S. District Court, venue will be in the Central District of California, in Los Angeles. [Signatures on the following page.]
(12-2023) Project No. __WT-5080___
CONTRACT
The Parties have caused this Contract to be executed by their undersigned authorized agents as follows:
CITY OF CAMARILLO
Greg Ramirez, City Manager
ATTEST:
Kristy Buxkemper, City Clerk
CONTRACTOR
(If not an individual, two signatures are required)
Name and Title
Name and Title
_ ________ __________________________ _ ________ Camarillo Business Tax Certificate Number Expiration Date
(12-2023) Project No. __WT-5080___
CONTRACT
A-1
EXHIBIT A
COMPENSATION
The total compensation under this Contract will not exceed:
ALTERNATE 1
If a Lump Sum Bid: “The sum of $ .”
ALTERNATE 2
If a Unit Price Bid: “The total unit prices set forth in the bid and the actual measured quantities utilized for the Project as determined by the Director.” ALTERNATE 3
If both Lump Sum and Unit Price Bid: “The sum of $ , and the amount due based upon the unit prices set forth in the bid and the actual measured quantities utilized for the Project as determined by the Director.”
(12-2023) Project No. __WT-5080___
CONTRACT
B-1
EXHIBIT B
INSURANCE
1. General Requirements. Contractor must procure and maintain in full force and effect during the term of this Contract the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below:
Type of Insurance Lim its (combined single)
Commercial General Liability $2 ,000,000 / $4,000,000 Aggregate Business Automobile Liability $1,000,000
Workers’ Compensation Statutory Requirements
Cyber Liability $1,000,000
2. Commercial General Liability Insurance. This policy must meet or exceed the requirements of Insurance Services Office (ISO) CGL Form No. CG 00 01. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage . The insurance must be on an “occurrence” not a “claims -made” basis. Defense costs must be paid in addition to limits. There must be no cross -liability exclusion for claims or suits by one insured against another.
Liability policies must be endorsed to name City, its officials, employees and agents as “additional insureds” under the insurance coverage.
The policy must state that such insurance will be deemed “primary” such that any other ins
urance that may be carried by City will be deemed “excess” to that of Contractor.
This endorsement must be reflected on ISO Form No. CG 20 01, or equivalent form as determined by City.
Coverage must be applicable to City for injury to employees of Contractor, subcontractors, agents or others performing any part of the Work required under this Contract. Each policy must be endorsed to provide a separate limit applicable to this Project.
The Commercial General Liability policy must not contain any endorsements limiting coverage beyond the basic policy coverage for any of the following:
1. Explosion, collapse or underground hazard (XCU);
2. Products and completed operation;
3. Pollution liability; or
4. Contractual liability.
3. Business Auto Coverage. This policy must be on ISO Business Auto Coverage Form CA 00 01 including symbol 1 (Any Auto) and Endorsement CA 0025, or equivalent forms approved in writing by City. If Contractor neither leases nor owns vehicles, this requirement may be satisfied by a non- owned auto endorsement to the general liability policy described above. If Contractor or Contractor’s employees will use personal autos (12-2023) Project No. __WT-5080___
CONTRACT
B-2
in any way on this Project, Contractor must provide evidence of personal auto liability coverage for each such person.
4. Workers Compensation. Contractor must have a State of California approved policy form providing the statutory benefits required by law with employer’s liability, or Contractor must provide evidence of an approved self-insurance program.
5. Cyber Liability Insurance. The cyber liability insurance must include the following coverage:
a. Liability arising from the theft, dissemination and/or use of confidential or personally identifiable information; including credit monitoring and regulatory fines arising from such theft, dissemination or use of the confidential information. b. Network security liability arising from the unauthorized use of, access to, or tampering with computer systems.
c. Liability arising from the failure of technology products (software) required under the Contract for Consultant to properly perform the services intended. d. Electronic media liability arising from personal injury, plagiarism or misappropriation of ideas, domain name infringement or improper deep- linking or framing, and infringement or violation of intellectual property rights. e. Liability arising from the failure to render professional services If coverage is maintained on a “claims -made” basis, Consultant must maintain such coverage for an additional period of three years following termination of the Contract.
6. Other Insurance; Revisions to Insurance. Contractor may be required to obtain such other insurance coverage as may be required by applicable law or by City. City reserves the right at any time during the term of the Contract to change the amounts and types of insurance required by giving Contractor 60 days advance written notice of such change.
If such change results in substantial additional cost to Contractor, City and Contractor may renegotiate Contractor’s compensation.
7. Acceptable Insurers. All required insurance policies must be issued by an insurance company currently authorized by the California Insurance Commissioner to transact the business of insurance in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the City’s Risk Manager.
8. Excess or Umbrella Liability Insurance (Over Primary). If an excess or umbrella liability policy is used to meet limit requirements, the insurance must provide coverage at least as broad as specified for the underlying coverages. Any such coverage provided under an excess or umbrella liability policy must include a “drop- down provision” providing primary coverage above a maximum $25,000 self -insured retention for liability not covered by primary but covered by the umbrella. Coverage must be provided on a “pay-on-behalf” basis, with defense costs payable in addition to policy limits. There may be no cross -liability exclusion precluding coverage for claims or suits by one insured against another. Coverage must be applicable to City for injury to employees of (12-2023) Project No. __WT-5080___
CONTRACT
B-3
Contractor, its subcontractors or others performing work to satisfy Contractor’s obligations under this Contract. The scope of coverage provided is subject to approval of City following receipt of proof of insurance as required herein.
9. Certificates of Insurance and Endorsements. Prior to commencing any Work under this Contract, Contractor must file with the City Certificates of Insurance and Endorsements evidencing the existence of all insurance required by this Contract, along with such other evidence of insurance or copies of policies as may reasonably be required by City. Such Certificates of Insurance and Endorsements must be in a form approved by City’s Attorney. Contractor must maintain current certificates and endorsements on file with City during the term of this Contract reflecting the existence of all required insurance. Each of the certificates must expressly provide that no material change in the policy, or termination thereof, will be effective except upon 30 days’ prior written notice to City.
10. Failure to Maintain Required Insurance. If Contractor, for any reason, fails to have in place at all times during the term of this Contract all of the required insurance coverage, City may, in addition to any other available remedies, (a) obtain such coverage at Contractor’s expense and deduct the cost from the sums due Contractor , (b) make a claim against the Contractor’s surety, or (c) terminate the Contract.
11. Effect of Coverage. The existence of the required insurance coverage under this Contract will not be deemed to satisfy or limit Contractor’s indemnity obligations under this Contract.
12. Higher Limits of Insurance. If Contractor m
aintains higher limits of insurance than the
required amounts shown in Section 1 above, then such amounts will be the minimum required under this Contract.
(12-2023) Project No. __WT-5080___
CONTRACT
VERIFICATION OF CALIFORNIA
CONTRACTOR’S LICENSE
I certify, under penalty of perjury, that I have a valid California Contractor’s license issued pursuant to Business and Professions Code section 7000 and following, and was so licensed at the time that the bid was awarded:
California Contractor’s License:
License Number Class Expiration Date
CONTRACTOR (PRINT OR TYPE)
Date Signature
(Public Contract Code § 6100)
(12-2023) Project No. __WT-5080___
CONTRACT
CERTIFICATE REGARDING
WORKERS’ COMPENSATION
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self - insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.
Name (print or type)
Date Signature
(12-2023) Project No. __WT-5080___
BOND
BOND NO.
PERFORMANCE BOND
On _____________________________, the City Council of the City of Camarillo, California, a municipal corporation (“CITY”), awarded a contract (“Contract”) to ____________________________________________________________________________ (“CONTRACTOR” or “PRINCIPAL”), for the work (“Work”) identified as ____________________________________________________________________________ The Contract and related documents (“Contract Documents”) are incorporated and made a part of this performance bond.
Under the Contract, CONTRACTOR is required to furnish this bond providing for the faithful performance of the Work
NOW, THEREFORE, we, CONTRACTOR, as PRINCIPAL, and
____________________________________________________________________________, a corporation organized and existing under the laws of the State of ________________________ and duly authorized to transact business under the laws of the State of California, as SURETY, are held and firmly bound unto CITY, in the sum of _______________________________________________________________________dollars ($_________________________), lawful money of the United States of America, this sum being not less than one hundred percent (100%) of the estimated amount payable by CITY under the terms of the Contract , PRINCIPAL and SURETY, bind ourselves and our heirs, executors, administrators, successors and assigns, jointly and severally, by this instrument.
BOND CONDITIONS
1. PRINCIPAL will perform the Work the identified in the Contract. CITY has estimated the required amount of the bond as shown above.
2. PRINCIPAL’s performance of the Work will be done in accordance with the Contract Documents. Should PRINCIPAL fail to satisfactorily complete all required Work within the time allowed, CITY may, at its sole discretion, either (1) cause all required Work to be done and the parties executing this bond will be firmly bound for the payment of all necessary costs for the performance of this Work or (2) make demand upon the SURETY to complete the required Work in which event the SURETY will commence completion of the Work within 30 days of the CITY’S demand unless otherwise agreed in a writing signed by the parties.
3. PRINCIPAL will guarantee the Work against any defective work, labor or materials for a period of one year following the completion and acceptance of the Work by CITY. (12-2023) Project No. __WT-5080___
BOND
4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the Camarillo Municipal Code.
5. SURETY agrees that no changes, extensions of time, alteration or modification of the Contract or of the obligations to be performed thereunder will in any way affect its obligation on this bond, and waives notice of any such change, extension of time, alteration or modification of the Contract or of the obligations to be performed.
Furthermore, SURETY expressly waives the provisions of California Civil Code sections 2845 and 2849.
6. This bond consists of this instrument, the Contract and Contract Documents referenced above, and the following two attached exhibits, all of which are incorporated herein by reference:
A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY’s representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY’s certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted.
7. In case suit is brought upon this bond, the court will award and SURETY must pay, in addition to the face amount of this bond, all costs and reasonable attorney’s fees incurred by CITY in successfully enforcing any obligation under this bond.
IN WITNESS THEREOF, we have hereunto set our hands and seals this _______ day of ____________________, 20____.
PRINCIPAL
By
Title
Address
Telephone Number
Signature
(12-2023) Project No. __WT-5080___
BOND
SURETY
By
Title
Address
Telephone Number
Signature
* ALL SIGNATURES ON THIS PERFORMANCE BOND MUST BE NOTARIZED USING APPROPRIATE 8½” x 11” NOTARY ACKNOWLEDGEMENT FORM.
** Appropriate modifications will be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.
*** Corporations must affix corporate seal.
(12-2023) Project No. __WT-5080___
BOND
BOND NO.
PAYMENT BOND
On __________________________, the City Council of the City of Camarillo, California, a municipal corporation (“CITY”), awarded a contract (“Contract”) to ____________________________________________________________________________ (“CONTRACTOR” or “PRINCIPAL”), for the work (“Work”) identified as ____________________________________________________________________________.
PRINCIPAL is required to furnish a bond under the Contract to secure the payment of claims of laborers, mechanics, material persons, and other persons as provided by law.
PRINCIPAL and __________________________________________________ ___________________________________, a corporation incorporated under the laws of the State of _______________________________ and licensed by the State of California to execute bonds and undertakings as sole surety (“SURETY”), are held and firmly bound unto CITY in the sum of ___________________________________________________ ______________________________________ dollars ($_________________________), lawful money of the United States, which may be increased or decreased by a rider hereto executed in the same manner as this bond, for the payment of which sum PRINCIPAL and SURETY bind themselves, their successors, and assigns, jointly and severally, by this instrument.
BOND CONDITIONS
1. PRINCIPAL will construct the Work identified in the Contract. Such performance will be in accordance with the Contract Documents identified in the Contract, which are hereby incorporated and made a part of this bond. CITY has estimated the required amount of the bond as shown above.
2. If PRINCIPAL, its heirs, executors, administrators, successors, assigns or subcontractors fail to pay any of the persons named in California Civil Code section 3181, or any amounts due under the California Unemployment Insurance Code with respect to work or labor performed under the Contract, or any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and its subcontractors under Unemployment Insurance Code section 13020, with respect to work or labor performed under the Contract, SURETY will pay for the same in an amount not exceeding the penal sum specified in this bond.
3. This bond inures to the benefit of any of the persons named in Civil Code section 3181 so as to give a right of action to such persons or their assigns in any suit brought upon this bond. In case suit is successfully brought upon this bond, SURETY further agrees to pay all reasonable attorneys’ fees and costs in an amount fixed by the court. (12-2023) Project No. __WT-5080___
BOND
4. This bond is conditioned upon and guarantees due compliance with all applicable law including, without limitation, the Camarillo Municipal Code.
5. SURETY agrees that no changes, extensions of time, alteration or modification of the Contract or of the obligations to be performed thereunder will in any way affect its obligation on this bond, and waives notice of any such change, extension of time, alteration or modification of the Contract or of the obligations to be performed.
Furthermore, SURETY expressly waives the provisions of California Civil Code sections 2845 and 2849.
6. This bond consists of this instrument, the Contract and Contract Documents referenced above, and the following two attached exhibits, all of which are incorporated herein by reference:
A. A certified copy of the appointment, power of attorney, bylaws or other instrument entitling or authorizing the persons executing this bond to do so; and B. A certificate issued by the county clerk for the county in which SURETY’s representative is located conforming with California Code of Civil Procedure § 995.640 and stating that SURETY’s certificate of authority has not been surrendered, revoked, cancelled, annulled, or suspended, or in the event that it has, that renewed authority has been granted.
IN WITNESS THEREOF, we have hereunto set our hands and seals this _______ day of ____________________, 20____.
PRINCIPAL
By
Title
Address
Telephone Number
Signature
(12-2023) Project No. __WT-5080___
BOND
SURETY
By
Title
Address
Telephone Number
Signature
* ALL SIGNATURES ON THIS PAYMENT BOND MUST BE NOTARIZED USING APPROPRIATE 8½” x 11” NOTARY ACKNOWLEDGEMENT FORM.
** Appropriate modifications will be made to this form if the bond is being furnished for the performance of an act not provided for by agreement.
*** Corporations must affix corporate seal.
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 1 -
CAM #4816-7464-0911 v5
CITY OF CAMARILLO
GENERAL CONDITIONS/SPECIFICATIONS
WORK IDENTIFICATION: ADVANCED METERING INFRASTRUCTURE – PROJECT NO. WT-5080__
SECTION
NO.
PAGE
NO.
1. Definitions ................................ ................................ ....................... 4
1.1 General Construction ................................ .......................... 4
1.2 Terms Defined ................................ ................................ .... 4
1.3 General Conditions/Specifications ................................ ....... 5
1.4 Abbreviations ................................ ................................ ...... 5
2. Work and Material Requirements ................................ ................... 6
2.1 Use of Premises ................................ ................................ .. 6
2.2 Materials Furnished By City ................................ ................ 6
2.3 Or Equal ................................ ................................ .............. 6
2.4 Samples ................................ ................................ .............. 6
2.5 Warranty ................................ ................................ ............. 6
2.6 Liens ................................ ................................ ................... 7
2.7 Manufacturer’s Recommendations ................................ ...... 8
2.8 Certificates of Compliance ................................ .................. 8
3. Grading Ordinance ................................ ................................ ......... 8
4. Progress Payments to Contractor ................................ ................... 8
4.1 Progress Payments to Subcontractors ................................ 8
4.2 Substitution of Securities ................................ ..................... 8
5. Time for Completion ................................ ................................ ....... 9
5.1 Payment for Delays to Contractor ................................ ....... 9
5.2 Rights of City to Increase Working Days ............................. 9
6. Construction Schedule and Commencement of Work ..................... 9
6.1 Proposed Construction Schedule ................................ ........ 9
6.2 Beginning of Work ................................ ............................... 11
6.3 Temporary Suspension of Work ................................ .......... 12
6.4 Starting of Contract Time ................................ .................... 12
6.5 Liquidated Damages ................................ ........................... 12
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 2 -
CAM #4816-7464-0911 v5
7. Subcontracting ................................ ................................ ................ 12
7.1 Subcontractors Bound By Contract ................................ ..... 12
7.2 City Consent to Subcontractors ................................ ........... 13
8. Work By Others ................................ ................................ .............. 13
8.1 City’s Right to Award Other Contracts ................................ . 13
8.2 Contractor’s Responsibilities ................................ ............... 13
9. Authority of the City Engineer ................................ ......................... 13
9.1 General Authority ................................ ................................ .. 13
9.2 Interpretation of Drawings and Specifications ....................... 14
9.3 Inspection ................................ ................................ ........... 14
9.4 Disputes Pertaining to Payment for Work ............................ 14
10. General Provisions ................................ ................................ ......... 14
10.1 Utilities ................................ ................................ ................ 14
10.2 Water Supply ................................ ................................ ...... 15
10.3 Dust Control ................................ ................................ ........ 15
10.4 Removal and Disposal of Structures and
Obstructions ................................ ................................ ........
15 10.5 Surveys ................................ ................................ ............... 15
10.6 Layout and Field Engineering ................................ .............. 15
10.7 Traffic Requirements ................................ ........................... 16
10.8 Tests and Inspections ................................ ......................... 17
10.9 Soils Investigation Report ................................ .................... 17
10.10 Compaction Tests ................................ ............................... 17
10.11 Cutting and Patching ................................ ........................... 18
10.12 Earthquake and Tidal Wave Damage ................................ .... 18
10.13 Highway and Railroad Permits ................................ .............. 18
10.14 Noise Control ................................ ................................ ....... 18
11. Acceptance of Work ................................ ................................ ....... 18
11.1 No Waiver of Legal Rights ................................ ................... 18
11.2 Non-Complying Work ................................ .......................... 19
11.3 Fulfillment of Contract ................................ ......................... 19
11.4 Correction of Work Before Acceptance ............................... 19
11.5 Deductions for Uncorrected Work ................................ ....... 19
11.6 Final Clean Up ................................ ................................ .... 19
11.7 Certificate as to Compliance With
Certain Regulations ................................ .............................
19 12. Claims between City and Contractor ................................ ............... 20
12.1 Definition of Claim ................................ ............................... 20
12.2 Notice of Potential Claim Procedure ................................ .... 20
12.3 Claim Processing Procedure ................................ ............... 21 (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 3 -
CAM #4816-7464-0911 v5
13. Assignment of Rights ................................ ................................ ...... 22
14. Prohibited Interests ................................ ................................ ......... 22
15. Labor Code Requirements ................................ .............................. 22
15.1 State Wage Determination ................................ .................. 22
15.2 Compliance Monitoring ................................ ....................... 23
15.3 Payroll Records ................................ ................................ ... 23
15.4 Apprentices ................................ ................................ ......... 24
15.5 Working Hours ................................ ................................ .... 25
15.6 Workers Compensation ................................ ....................... 25
15.7 Protection of Workers in Trench
Excavations ................................ ................................ ........
25 16. Sales and Use Tax Cooperation ................................ ..................... 26
17. Documentation of Status of Surety ................................ ................. 26
18. Construction and Demolition Waste ................................ ................ 26
19. Use of Premises ................................ ................................ ............. 27
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 4 -
CAM #4816-7464-0911 v5
GENERAL CONDITIONS/SPECIFICATIONS
1. Definitions
1.1 General Construction
Terms used in these General Conditions/Specifications and in other Contract Documents will have the definition provided in this Section 1, unless the context requires a different meaning.
The word “person” includes a corporation, association, partnership and any other form of legal entity.
Unless otherwise specifically defined herein, or unless the context requires a different meaning, all words, terms and phrases having a well -known or technical meaning will be so construed.
In the event of conflict, the order of precedence of governing documents will be as set forth in Section 5.1 of the Instructions to Bidders.
1.2 Terms Defined
Acceptance: The formal written acceptance by City of a project that has been completed in all respects in accordance with the plans and specifications and any modifications.
Addendum: The modi f ication of the plans and/or specifications issued to all prospective bidders during the period when necessary to change, correct, clarify, or further define any phase of the work.
Bidder: Any person submitting a proposal for the work contemplated, acting directly or through a duly authorized representative.
City: The City o f Camarillo, County of Ventura, State of California City Clerk: The City Clerk of City.
City Council: The City Council of City.
City Engineer/Engineer of Work/Engineer: The City Engineer of City or his/her duly authorized deputies, agents, representatives or inspectors.
Contractor: The succ essful bidder who is awarded the Contract.
Days: Calendar days, unless business days or work days, are expressly specified.
Materials: Any material, equipment, appliance, process, item or article of any nature whatsoever installed or incorporated into the work or provided to City under the Contract.
Project: The pro j ect is the total improvement, of which the work performed under the Contract may be the whole or a part.
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 5 -
CAM #4816-7464-0911 v5
Punch List: Lis t of corrective items, determined by the Engineer, which must be completed by the Contractor.
Special Provisions: A ny provision in the Contract Documents that supplements, modifies and, when in conflict, supersedes these General Conditions/Specifications.
Standard Specifications/Green Book/SSPWC: Standar d Specifications for Public Works Construction, 2018 edition, written and promulgated by Public Works Standards, Inc. and all supplements thereto.
State Standard Plan: Standar d Plans prepared by the State of California, Business & Transportation Agency, Department of Transportation, latest edition.
Subcontractor: Any subcontractor under Contractor.
Work: That which is proposed to be constructed or done under the Contract, in strict accordance with the Contract Documents, including the furnishing of all necessary or convenient tools, equipment, material, labor and transportation.
Working Days: A wor king day is defined as any day, except Saturdays, Sundays, legal holidays and except days when Work is suspended by the Engineer, and any other day determined to be non-working in accordance with the Contract Documents.
1.3 General Conditions/Specifications
The provisions of these General Conditions/Specifications and any other Contract Document supersede the SSPWC to the extent that the provisions supplement, modify or conflict with the SSPWC in accordance with Section 5.1 of the Instructions to Bidders.
1.4 Abbreviations
AAN American Association of Nurserymen
AGC Associated General Contractors of America
AISC American Institute of Steel Construction
APWA American Public Works Association
ASME American Society of Mechanical Engineers
AWS American Welding Society
AWWA American Water Works Association
EIA Electronic Industries Association
IEEE Institute of Electric and Electronic Engineers
NEC National Electric Code
NEMA National Electrical Manufactures Association
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 6 -
CAM #4816-7464-0911 v5
SSS State of California Standard Specifications, Latest edition, Department of Public Works, Department of Transportation VCSS Ventura County Standard Specifications
2. Work and Material Requirements
2.1 Use of Premises
(a) Contractor must confine all tools and equipment, the storage of materials, and the operation of workers to areas designated by the Engineer. (b) With respect to any premises, tools or equipment of City made use of in the performance of the Contract, Contractor will be deemed to have inspected the same prior to use, have accepted them in good and safe condition and have agreed to maintain them in a safe condition for the protection of workmen while using them during the performance of the Work.
2.2 Materials Furnished By Cit y
Materials furnished by City will be available at locations designated in the Special Provisions, or if not designated in the Special Provisions, will be delivered to a single location of City’s choice within the project area. The materials will be hauled to the site of installation by Contractor at its expense, including any necessary loading and unloading that may be involved.
The cost of handling and placing materials furnished by City will be considered as included in the price paid for the item involving such furnished material.
2.3 Or Equal
In the event that an item is called for by a specific product or trade name, Contractor will have 35 days after the award of the Contract for submission of data substantiating a request for a substitution of “an equal” item. In the event Contractor furnishes any “or equal” material more expensive than that specified in the bid form, the difference in cost of such material so furnished will be borne by Contractor under Public Contract Code section 3400.
2.4 Samples
Contractor must furnish for approval, within 35 days following notice of award of Contract, all samples as required in specifications together with catalogs and supporting data required by the Engineer. This provision does not authorize any extension of time for performance of the Contract. The Engineer will review such samples only for conformance with design and concept of Work and for compliance with information given in the Contract Documents. Work must be in accordance with approved samples under Public Contract Code section 3400.
2.5 Warranty
(a) The labor and materials bond must remain in effect until expiration of six months after the period in which verified claims may be filed as provided in Civil Code section 9356, and the performance bond must be paid up and in effect for one year after the acceptance of the job by City in accordance with the guarantee required by Subsection 2.5(b), below. (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 7 -
CAM #4816-7464-0911 v5
(b) Besides warranties and guaranties otherwise required by the Contract Documents, Contractor warrants and guarantees all Work for a period of one year after date of acceptance of the Work by City, unless a longer period is specified, and must repair or replace any or all such Work, together with any other Work, which may be displaced in so doing, that may prove defective in workmanship, materials or both within one year from date of acceptance without expense whatsoever to City, ordinary wear and tear, unusual abuse or neglect excepted. The Engineer will give notice of observed defects with reasonable promptness.
Contractor must notify the Engineer upon completion of repairs. (c) In the event Contractor fails to commence the corrective work within 10 days after being notified in writing to do so by the Engineer and prosecute the corrective work to timely completion, City may proceed to have defects corrected and made good at the expense of Contractor who must pay the costs and charges of such corrective work immediately on demand.
(d) If, in the opinion of the Engineer, defective work creates a condition that requires immediate corrective work, the Engineer will attempt to give the notice required by this Section.
If Contractor cannot be contacted or does not comply with City’s request for correction within a reasonable time as determined by the Engineer, City may, notwithstanding the provisions of this Section, proceed to make such corrective work, and Contractor will be liable for costs of such corrective work. Such action by City will not relieve Contractor of the warranties and guaranties provided in this Section or elsewhere in the Contract.
(e) This Section does not in any way limit the warranty or guaranty on any material for which a longer warranty or guaranty is specified in the Contract Documents or on any items for which a manufacturer gives a warranty or guaranty for a longer period. Contractor must furnish the Engineer with all appropriate warranty and guaranty certificates upon completion of the Work.
(f) For federally funded transportation projects, City does not require a warranty and the applicable bonds may be exonerated administratively.
2.6 Liens
No materials, supplies, tools or equipment for Work under this Contract may be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest herein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all materials installed or incorporated in the Work by Contractor or any subcontractor and agrees upon completion of all Work to deliver premises, together with all improvements and appurtenances constructed or placed thereon by Contractor, to City free from any claim, liens, or charges. Contractor further agrees that neither Contractor nor any person furnishing any materials, supplies, tools, equipment or labor for any Work covered by this Contract will have any right to lien upon the premises or any improvement or appurtenance thereon, except that Contractor may install metering devices or other equipment of utility companies or of political subdivisions title to which is commonly retained by utility companies or political subdivisions. In event of the installation of any such metering device or equipment, Contractor will so advise City. Nothing contained in this article, however, will defeat or impair the rights of persons furnishing material or labor under any bond given by Contractor for their protection or any rights under any law permitting such persons to look to funds due Contractor in the hands of City, and this provision will be inserted in all subcontracts and material contracts and notice of its provisions will be given to all persons furnishing material for Work when no formal contract is entered into for such material.
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 8 -
CAM #4816-7464-0911 v5
2.7 Manufacturer’s Recommendations
Where the manufacturer of any material or equipment provides written recommendations or instructions for its use or method of installation (including labels, tags, manuals or trade literature), such recommendations or instructions must be complied with, except where the Contract Documents specifically require deviations.
2.8 Certificates of Compliance
The City Engineer may require certificates of compliance with the specifications for materials or manufactured items produced outside of the job site. Such certificates will not relieve Contractor from the requirements of providing materials and manufactured items complying with the specifications even though they have been incorporated into the job.
3. Grading Ordinance
(a) All excavation, filling and grading operations in Camarillo are governed by City’s Grading Ordinance. No grading permit is required of Contractor for Work performed within the limits of the project right-of-way shown on the plans.
(b) Materials, exported or wasted outside of the project right -of-way shown on the plans, are subject to all requirements of the Grading Ordinance. The requirements may include, but are not limited to, submitting a grading plan prepared by a civil engineer, obtaining a grading permit, paying the permit fee, posting a grading bond, hiring professionals for engineering and testing services, compacting fills, constructing drainage facilities, and providing erosion protection. These requirements are the responsibility of the owner of the land on which the material is placed. To ensure that neither City nor Contractor are a party to aiding or abetting any property owner to violate the Grading Ordinance, no material may be exported or wasted outside the limits of the project right- of-way until Contractor has furnished the Engineer a copy of the grading permit or certificate of exemption covering such operation on land where the material is to be deposited.
4. Progress Payments to Contractor
4.1 Progress Payments to Subcontractors
Contractor must pay to any subcontractor, no later than seven days after receipt of each City progress payment, unless otherwise agreed to in writing, the respective amounts allowed Contractor on account of the work performed by the subcontractors, to the extent of each subcontractor’s interest in the progress payment. In the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the Contractor to a subcontractor, the Contractor may withhold no more than 150% of the amount disputed.
In all contracts between Contractor and its subcontractors , the percentage of the retention of proceeds withheld may not exceed the percentage specified in the Contract Documents between the City and the Contractor.
4.2 Substitution of Securities
Pursuant to Public Contract Code section 22300 and upon Contractor’s request, City will make payment of funds retained from progress payments for performance security, if Contractor deposits in escrow with City’s Finance Director or with a state or federal chartered (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 9 -
CAM #4816-7464-0911 v5
bank acceptable to City as escrow agent, securities eligible for the investment of City funds under Government Code section 16430 or bank or savings and loan certificates of deposit.
Securities may be substituted upon the following terms and conditions:
(a) Contractor will bear all expenses in connection with the escrow deposit made. (b) Securities or certificates of deposit must be of a value equal to 100% of the amounts of retention to be paid to Contractor.
(c) Contractor must enter into an escrow agreement that is substantially the same as set forth in Public Contract Code section 22300.
(d) Contractor must obtain the written consent of the surety to the escrow agreement.
5. Time for Completion
5.1 Payment for Delays to Contractor
Contractor will be compensated when any extension of time is granted for delays caused solely by action or inaction of City, which the Engineer determines materially increases or decreases the costs of any portion of the Work. If the Engineer determines that compensation is not justified, Contractor will be so advised in writing. Contractor may then submit a notice of potential claim to the Engineer, as provided in the Standard Specifications relative to disputed Work.
5.2 Rights of Cit
y to Increase Working Days
If such Work is not completed within the time for completion, the City Council has the right to increase the number of working days in the amount it may determine will best serve the interests of City, and, if it desires to increase the number of working days, it has the further right to charge Contractor and deduct from the final payment for the Work, the actual cost of engineering, inspection, superintendence, and other overhead expenses that are directly chargeable to Contractor, and that accrue during the period of such extension, except that the cost of the final service and preparation of the final estimates may not be included in such charges.
6. Construction Schedule and Commencement of Work
6.1 Proposed Construction Schedule
(a) After notification of award and prior to the start of any Work, Contractor must submit to the City Engineer for approval the proposed construction schedule. The construction schedule must be in the form of a Critical Path Method (CPM) in sufficient logic and detail to show the chronological relationship of all activities of the project, including, but not limited to, estimated starting and completion dates of various activities, procurement of materials and scheduling of equipment, work of subcontractors, interface with work by others, and other tasks required to complete the project. The level of detail must be consistent with the complexity of the project as determined by the City Engineer. The construction schedule must reflect completion of all Work included in the Contract within the Completion Time in accordance with these specifications. A construction schedule showing the project complete in less than the Completion Time will not be accepted. The construction schedule must be cost loaded on a monthly basis. (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 10 -
CAM #4816-7464-0911 v5
(b) If Contractor desires to make a major change in its method of operation after commencing construction, or if its schedules fail to reflect the actual progress, it must submit to City a revised construction schedule in advance of beginning any revised operations. (c) The baseline construction schedule must utilize the Completion Time included in the Contract and must not extend beyond the number of working days. The baseline schedule must have a date of the first working day of the Contract and not include any completed work to date. The baseline construction schedule must not attribute negative float or negative lag to any activity. If the Contractor intends to complete the Work prior to the time of completion, the intended date of completion must be set forth in the construction schedule and the Contractor must execute a zero -cost Contract Change Order that reduces the number of working days allowed for completion to conform to the intended completion date. (d) Float, slack time, or contingency within the schedule and the total float within the overall construction schedule, is not for the exclusive use of the Contractor or the City, but is jointly owned and is a resource to meet Contract milestones and the Contract Completion Time.
The Contractor must not sequester shared float through such strategies as extending activity duration estimates, using preferential logic, or using extensive crew/resource sequencing. Since float time within the construction schedule is jointly owned, no time extensions will be granted nor delay damages paid unless a delay occurs that extends the Work beyond the Contract Completion Time. Since float time within the construction schedule is jointly owned, it is acknowledged that City caused delays can be offset by City caused time savings. Therefore, the Contractor will not be entitled to receive a time extension or delay damages until all City caused time savings are exceeded and the Contract Completion Time is also exceeded. (e) If the Contractor has fallen behind the accepted Construction Schedule by more than 15 percentage points based on earned progress payments, the Contractor must take steps, including, but not limited to, increasing the number of personnel, shifts, and/or overtime operations, days of work, and/or amount of construction equipment until such time as the Work is back on schedule. Contractor must also submit for review no later than the next request for partial payment, such supplementary schedule or schedules as may be deemed necessary to demonstrate the manner in which the rate of progress will be regained. All cost required to bring the Project back on schedule will be borne by the Contractor without additional cost to the City.
(f) If the Contractor falls behind the accepted construction schedule, as modified by such time extensions as may have been granted by the City for unavoidable delays, by more than 35 percentage points based on earned progress payments, the Contractor will be deemed in material breach of Contract and the Work turned over to the surety for completion within the scheduled time.
(g) Contractor must include in the schedule, detailed information for each operation.
When the project schedule includes multiple streets or sites, Contractor must include detailed information for each street or site. When notifications or parking restrictions are required such dates must be included in the schedule.
(h) Contractor must provide critical path schedules in legible hardcopy format and must also submit schedules with each update in an editable electronic format compatible with MS Project or Primavera as directed by Engineer.
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 11 -
CAM #4816-7464-0911 v5
6.2 Beginning of Work
(a) The delivery to City, for execution and approval of the Contract Documents properly executed on behalf of Contractor and surety, constitutes Contractor’s authority to enter upon the site of the Work and to begin operations, subject to its assumption of the risk of the disapproval of the Contract, as herein provided, and subject also to the following:
(1) Contractor’s receipt from City for the properly executed Contract Documents, including bonds and certificates of insurance. (2) City may, for any reason, order Contractor not to enter upon the site of the Work, which order will nullify the authority of Contractor to enter upon the site prior to receipt of the Notice to Proceed.
(3) Notice in writing of Contractor’s intention to start Work prior to approval, specifying the date on which Contractor intends to start, must be given to the Engineer at least 48 hours in advance.
(4) Contractor must, on commencing operations, take all precautions required for public safety and observe all the provisions in these General Conditions/Specifications and any Special Provisions.
(5) In the event of disapproval of the Contract, Contractor must, at its expense, do such Work as is necessary to leave the site in a neat condition to the satisfaction of the Engineer. If the Work done affects any existing road or highway, Contractor must, at its expense, restore it to its former condition or the equivalent thereof to the satisfaction of the Engineer.
(6) All Work done according to the Contract prior to its approval will, when the Contract is approved, be considered authorized Work and will be paid for as provided in the Contract.
(b) Entry upon the site without authority will be treated as trespassing. (c) Should Contractor begin the Work in advance of receiving notice that the Contract has been approved as provided above, any Work performed by Contractor in advance of the date of approval will be considered as having been done by Contractor at Contractor’s own risk and as a volunteer unless the Contract is so approved. (d) Contractor may start the Work at any time after the Notice to Proceed is issued, but Work must begin within the number of days indicated on the Bid Proposal after the starting date for the Contract, or at such other times as may be indicated in the Special Provisions. The actual date on which Contractor starts the Work will not affect the required item for completion as provided for in the Contract.
(e) If required by the Special Provisions, Contractor must start construction operations on that part of the project designated by the Engineer. (f) Contractor must perform all the Work in such a manner and with sufficient materials, equipment, and labor to insure its completion in accordance with the plans and specifications within the time set forth in the Contract. (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 12 -
CAM #4816-7464-0911 v5
6.3 Tempor ary Suspension of Work
(a) Should suspension of the Work be ordered by reason of the failure of Contractor to carry out orders or to perform any provisions of the Contract; or by reason of weather conditions being unsuitable for performing any item or items of the Work; Contractor, at its expense, must take all steps necessary to provide and maintain a safe, smooth, and unobstructed passageway through construction for use by public traffic during the period of such suspension. In the event that Contractor fails to take such steps, City may perform such tasks and the cost thereof will be deducted from monies due Contractor. (b) If the Engineer orders a suspension of all of the Work or a portion of the Work which is the current controlling operation or operations, due to unsuitable weather or to such other conditions as are considered unfavorable to the suitable prosecution of the Work, the days on which the suspension is in effect will not be considered working days for the purpose of calculating Contractor’s time of performance.
(c) If a portion of the Work at the time of such suspension is not a current controlling operation or operations, but subsequently does become the current controlling operation or operations, the determination of working days will be made on the basis of the then current controlling operation or operations.
(d) If suspension of the Work is ordered by the Engineer, due to the failure on the part of Contractor to carry out orders given or to perform any provision of the Contract, no time extension for such suspension will be granted.
6.4 Starting of Contract Time
As soon as practicable after the Contract has been executed by both parties, a Notice to Proceed will be issued by City stating the starting date of the Contract time, which will be as stated in the Notice to Proceed, unless otherwise provided in the Special Provisions.
6.5 Liquidated Damages
The parties agree that time is of the essence in the completion of the Work, and that in case all the Work called for under the Contract is not completed before or upon the expiration of the time limit as set forth in the Contract Documents, as modified by extensions of time granted by City, damage will be sustained by City. As it is impracticable to determine the actual delay damage, the parties agree that Contractor must pay liquidated damages to City in the amount set forth on page 1 of the Bid Proposal, per calendar day for each and every calendar day’s delay beyond the time prescribed to complete the Work. If Contractor fails to pay the liquidated damages, City may deduct the amount from any monies due or that may become due Contractor under the Contract.
7. Subcontracting
7.1 Subcontractors Bound By Contract
Contractor agrees to bind every subcontractor by the terms of the Contract as far as such terms are applicable to the subcontractor’s work. If Contractor subcontracts any part of this Contract, Contractor will be fully responsible to City for the acts and omissions of every subcontractor and of persons either directly or indirectly employed by every such subcontractor. (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 13 -
CAM #4816-7464-0911 v5
Nothing contained in the Contract Documents, however, creates any contractual relation between any subcontractor and City.
7.2 City C onsent to Subcontractors
City’s consent to, or approval of, any subcontractor under the Contract does not in any way relieve Contractor of its obligations under the Contract nor will such subcontract or approval be deemed to waive any provision of the Contract between City and Contractor.
8. Work By Others
8.1 City’s Right to Award Other Contracts
(a) City reserves the right to award other contracts in connection with the project.
Nothing in these General Conditions/Specifications may be interpreted as granting to Contractor exclusive occupancy at the site of the project.
(b) If simultaneous execution of any contract is likely to cause interference with performance of some other contract or contracts, City will decide which contractor must cease Work temporarily and which contractor must continue or whether Work can be coordinated so that contractors may proceed simultaneously. Notwithstanding any other provision of these General Conditions/Specifications, City is not responsible for any damages suffered or extra costs incurred by Contractor resulting directly or indirectly from the award or performance or attempted performance of any other contract or contracts on the project, or caused by any decision or omission of City respecting the order of precedence in performance of contracts.
8.2 Contractor’s Responsibilities
Contractor must ascertain to its own satisfaction the scope of the project and nature of any other contracts that have been or may be awarded by City in prosecution of the project to the end that Contractor may perform the Contract in consideration of such other contracts, if any.
Contractor must afford other contractors and utilities reasonable opportunity for introduction and storage of their materials and execution of their tasks and must properly connect and coordinate its efforts with theirs. Contractor may not cause any unnecessary hindrance or delay to any other contractor working on the project.
If any part of Contractor’s Work depends for proper execution or results upon Work of any other contractor, Contractor must inspect and promptly report to the City Engineer any defects in such Work that render it unsuitable for such proper execution and results. Its failure so to do constitutes a waiver by Contractor of any claim of delay caused by events beyond Contractor’s control.
9. Authority of the Engineer
9.1 General Authority
The Engineer will decide any and all questions which may arise as to the quality or acceptability of materials furnished and Work performed, and as to the manner of performance and rate of progress of the Work, and must decide all questions that may arise as to the interpretation of the drawings and specifications, and all questions as to the acceptable (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 14 -
CAM #4816-7464-0911 v5
fulfillment of the Contract on the part of Contractor, and as to compensation. The Engineer’s decisions are final and the Engineer has authority to enforce and make effective such decisions and orders.
9.2 Interpretation of Drawings and Specifications
The Engineer will interpret the meaning of any part of the drawings and specifications about which any misunderstanding may arise and the Engineer’s decision will be final. Should there appear to be any error or discrepancy in or between the drawings and specifications, Contractor must refer the matter to the Engineer for adjustment before proceeding with the Work. Should Contractor proceed with the Work without so referring the matter, it does so at its own risk.
9.3 Inspection
(a) The Engineer must be provided full access to all operations involving the Work under the Contract and be provided reasonable advance notice of the time and place of operations which the Engineer desires to observe. The Engineer must be provided with all requested samples of materials and Work for testing purposes. (b) Contractor must furnish the Engineer reasonable facilities for obtaining such information as may be necessary to keep the Engineer fully informed respecting the progress and the manner of the Work. The Engineer’s inspection of the Work will not relieve Contractor from any obligation under the Contract. The Engineer has authority to stop any Work whenever provisions of Contract Documents are not being complied with and Contractor must instruct its employees and any subcontractors accordingly.
9.4 Disputes Pertaining to Payment for Work
Should any dispute arise respecting the true value of any of the Work done, of any of the Work omitted, or any extra Work which Contractor may be required to do, or respecting the size of any payment to Contractor during the performance of the Contract, such dispute will be decided by the Engineer.
10. General Provisions
10.1 Utilities
(a) All utilities, including but not limited to, electricity, water, gas, telephone used on the Work will be furnished at Contractor’s sole expense. Contractor must furnish and install necessary, temporary distribution systems, including meters, from distribution points to points on site where utility is necessary to carry on the Work. Upon completion of the Work, Contractor must remove all temporary distribution systems. Unless otherwise indicated, the Contractor must also arrange for permanent utilities as necessary for completion and operation of the work. Contractor must pay for utilities until the “Project Acceptance and Final Payment” form is executed and the Work is accepted by the Engineer. (b) If the Contract is for an addition to an existing structure, Contractor may, with written permission of the Engineer, use City’s existing utilities to carry on the Work by making prearranged payments to City.
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 15 -
CAM #4816-7464-0911 v5
10.2 Water Supply
Water may only be used in the service area of the applicable water purveyor.
Water may not be imported or exported from one water purveyor’s service area to another water purveyor’s service area. If the work area crosses multiple water purveyor’s service areas, one fire hydrant meter from each water purveyor must be obtained, and water from each fire hydrant meter may only be used in the applicable water service area for each water purveyor.
All water used other than through a service connection and meter must be through a fire hydrant meter. Hydrant meters will be installed by the City of Camarillo Water Division or applicable water purveyor and moved from one location to another only upon approval of the City of Camarillo Water Division or other applicable water purveyor. The Contractor must pay all applicable fees and charges related to the construction water account, including but not limited to deposits, installation, inspection and related costs.
Water used will be charged at the unit rate per 100 cubic feet as currently established by City Council resolution or by the applicable water purveyor.
10.3 Dust Control
Contractor must provide such dust control equipment and methods as may be required to protect adjacent property from annoyance or damage from dust caused by its operations, and failure to control such dust will be cause for the Engineer to stop the Work until the dust is controlled. Contractor will have no recourse to collect from City for any loss of time or expense sustained by Contractor due to such suspension of the Work.
10.4 Removal and Disposal of Structures and Obstructions All fences, trees, and obstructions of any nature to the execution of the Work removed by Contractor must be disposed of, reused or delivered to City’s Corporation Yard as required. These tasks are to be included in the cost of other items bid on, if there is no item covering the same. Any obstruction that is privately owned that is removed by Contractor must be replaced or compensated at Contractor’s sole expense to the satisfaction of the Engineer.
10.5 Surveys
Surveys to determine location of property lines and corners, locations of construction, grading and site Work must be supplied by Contractor.
No survey information beyond the information on the plans will be provided by the Engineer. Contractor must preserve all stakes set for the lines, grades or measurements of the Work until authorized to remove them by the Engineer. Any expense incurred in replacing such stakes which Contractor may have failed to preserve will be borne by Contractor.
10.6 Layout and Field Engineering
All field engineering required for laying out the Work and establishing grades for earthwork operations will be furnished by Contractor at its sole expense. Such engineering will be done by a qualified Civil Engineer approved by the Engineer. Any required “as built” drawings of site development must be prepared by the approved Civil Engineer at Contractor’s sole expense.
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 16 -
CAM #4816-7464-0911 v5
10.7 Traffic Requirements
(a) Street Closures, Detours, and Barricades.
(1) Street closures require discretionary City Council authorization and are not allowed unless no safe and effective alternative exists. Contractor must prepare a comprehensive justification for the proposed alternative.
Contractor must consider contract time in the justification, and allow at least 45 calendar days for City review and processing. Meetings, including those outside normal working hours may be necessary. (2) All costs involved in complying with the following requirements for street closures, detours and barricades will be borne by Contractor. (3) Contractor must notify the Engineer at least 5 working days before closing or partially closing any street. The Contractor must arrange detour routes and issue signing instructions, if required. All detour routes must be submitted for approval by the Engineer at least 10 working days before the detour.
(4) Contractor must notify the following agencies, at least 48 hours in advance of the closing, partial closing, or opening of any street or alley:
Camarillo Police Department 805-388-5100
Ventura County Fire Department 805-389-9710
Camarillo Public Works Department 805-388-5340
Camarillo Streets Division 805-388-5338
E.J. Harrison 805-207-0159
Camarillo Post Office 805-383-9804
Camarillo Area Transit 805-388-5346
(5) Contractor must install, maintain, and remove all temporary barricades, lights, warning signs, and other facilities necessary to control traffic as specified in the California Manual on Uniform Traffic Control Devices (CMUTCD). Materials for a temporary facility may be provided from new or used materials. If used materials are provided, they must be sound, in good condition, and otherwise meet the requirements of new materials. (6) If at any time any portion of the street is obstructed to traffic, Contractor must post “No Parking Anytime” signs on both sides of the street for a distance of 300 feet beyond the obstructed portion of the street. (7) In addition to the lane width specified in subsection (b) below, Contractor must maintain a minimum clearance of three feet to excavations and a minimum of two feet to curbs and other obstructions. When traffic patterns required by the Work are such that opposing lanes of traffic must cross the existing centerline, Contractor must separate the opposing lanes at intervals, not to exceed 25 feet, or as directed by the Engineer. (b) Minimum Requirements for Maintaining Traffic Flow: Traffic in each direction must be maintained on all streets at all times. Traffic lanes of at least 10 feet must be used. (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 17 -
CAM #4816-7464-0911 v5
10.8 Tests and Inspections
(a) If the Contract, or any laws, ordinances, regulators or any public authority requires any of the Work to be specially inspected, tested or approved, Contractor must give notice in accordance with such authority of its readiness for such inspection or test at least two working days prior to such inspection. If inspection or testing is by an authority other than City, Contractor must arrange for such inspection or testing, and Contractor must also give at least two working days prior written notice to the authority and the Engineer of the date fixed for such inspection. Required certificates of inspection or approval must be secured by Contractor. The Engineer will promptly make observations, where practicable, and do so at the source of supply.
If any of the Work is covered up without approval or consent of the Engineer, it must, if required by the Engineer, be uncovered for inspection or testing and satisfactorily reconstructed at Contractor’s sole expense in strict accordance with the Contract Documents. Costs of tests and inspections of any materials found to be not in compliance with the Contract must be paid for by Contractor at its sole expense. Other costs for tests and inspection of materials will be paid by City.
(b) Where such inspection and testing are to be conducted by an independent laboratory agency, such materials or samples of materials to be tested will be selected by such laboratory or agency, or the Engineer, and not by Contractor. (c) Contractor must notify the Engineer in writing a sufficient time in advance of manufacture of materials to be supplied under contract, which must by terms of the contract be tested, in order that the Engineer may arrange for testing of same at the source of supply. Any materials shipped by Contractor from the source of supply prior to having satisfactorily passed such testing and inspection, or prior to receipt of notice from the Engineer that such testing and inspection will not be required, may not be incorporated in the Work without prior approval of the Engineer and subsequent testing and inspections.
(d) Re-examination of questioned Work may be ordered by the Engineer and, if so ordered, the Work must be uncovered by Contractor. If such Work is found to be in accordance with the Contract Documents, City will pay the costs of re-examination and replacement. If such Work is found not to be in accordance with the Contract Documents, Contractor must pay the costs at its sole expense.
10.9 Soils Investigation Report
When a soils investigation report is available from City, such report will not be a part of the Contract. Any information obtained from such report or any information given on drawings as to subsurface soil condition or to elevations of existing grades or elevations of underlying rock is approximate only, is not guaranteed, and does not form a part of the Contract.
Contractor is required to make a visual examination of site and must make whatever tests it deems appropriate to determine underground condition of soil.
10.10 Compaction Tests
(a) Contractor must perform compaction tests as required by the City Engineer, in accordance with ASTM D-1557 or California Test Method No. 216. (b) Contractor must bear the total expense of all failing tests. (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 18 -
CAM #4816-7464-0911 v5
10.11 Cutting and Patching
(a) Contractor must do all cutting, fitting, or patching of the Work as required to make its several parts come together properly and fit to receive or be received by other contractors showing upon, or reasonably implied by, the drawings and specifications for the completed project, as the Engineer may direct. All costs caused by defective or ill-timed Work will be borne by the Contractor.
(b) Contractor may not endanger any of the Work by cutting, excavating, or otherwise altering the Work and may not cut or alter any Work of any other contractor, except with the written consent of the Engineer.
10.12 Earthquake and Tidal Wave Damage
Notwithstanding the provisions of Subsection 4 -2 of the SSPWC, when the Governor of California or the President of the United States declares that the area where the Work is being constructed is a disaster area due to earthquakes or tidal waves, Contractor will be relieved of the responsibility for repairing damage to the Work caused by earthquake or tidal wave, unless such damage results from negligent acts or omissions of Contractor.
10.13 Highway and Railroad Permits
The Engineer will obtain the basic state highway and railroad encroachment permits, which will include checking of plans. Contractor must also obtain its own permits from these agencies. Inspection and permit fees charged by these agencies must be paid by Contractor. Any other permits must be obtained by Contractor at no additional cost to City.
10.14 Noise Control
Construction Noise Level Limits: Construction operations must comply with City of Camarillo Municipal Code, specifically Chapter 10.34, Noise Regulations.
11. Acceptance of Work
11.1 No Waiver of Legal Rights
(a) City will not be precluded or estopped by any measurement, estimate, or certificate made either before or after the completion and acceptance of the Work and payment therefor from showing the true amount and character of the Work performed and materials furnished by Contractor, nor from showing that any such measurement, estimate, or certificate is untrue or is incorrectly made, nor that the Work or materials do not in fact conform to the Contract.
(b) City will not be precluded or estopped, notwithstanding any such measurement, estimate, or certificate and payment in accordance therewith, from recovering from Contractor or its surety, or both, such damages as it may sustain by reason of Contractor’s failure to comply with the terms of the Contract.
(c) Neither the acceptance by the Engineer nor by the Engineer’s representative nor any payment for or acceptance of the whole or any part of the Work, nor any extension of time, nor any possession taken by the Engineer will operate as a waiver of any portion of the Contract or of any power herein reserved, or of any right to damages. (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 19 -
CAM #4816-7464-0911 v5
(d) A waiver of any breach of the Contract will not be held to be a waiver of any other or subsequent breach.
11.2 Non-C omplying Work
Neither the final certificate of payment nor any provision in the Contract Documents, nor partial or entire occupancy of the premises by the City, will constitute an acceptance of any of the Work not done in accordance with the Contract Documents or relieve Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship.
11.3 Fulfillment of Contract
Contractor must, at its sole expense, protect and care for all the Work it performs until the Contract has been fulfilled to the satisfaction of, and the Work has been accepted in writing by, the Engineer. The date upon which the Engineer accepts the Work as complete will be the date that Contractor is relieved from responsibility to protect the Work.
11.4 Correction of Work Before Acceptance
(a) Contractor must promptly remove from the site or premises all Work determined by the Engineer as failing to conform to Contract, whether or not installed or incorporated.
Contractor must promptly replace and re- execute the Work to comply with the Contract Documents without additional expense to City and will bear the expense of making good all Work of other contractors destroyed or damaged by such removal or replacement. (b) If Contractor does not remove such nonconforming Work within a reasonable time, City may remove it and may store the material at Contractor’s expense. If Contractor does not pay expenses of such removal within 10 days’ time thereafter, City may, upon 10 days’ written notice, discard such materials or sell such materials at auction or at private sale and will provide an accounting to Contractor for net proceeds of such sale, after deducting all costs and expenses that should have been borne by Contractor.
11.5 Deductions for Uncorrected Work
If City deems it inexpedient to correct any Work injured or not done in accordance with the Contract, City will make an equitable deduction from the Contract price.
11.6 Final Clean Up
Upon completion of the Work and before acceptance and final payment will be made, Contractor, as its sole expense, must clean the Work area and all premises occupied by it in connection with the Work. All rubbish, weeds, graffiti, one- call USA markings, excess materials, falsework, temporary structures, tools and equipment must be removed and all parts of the Work must be left in a neat and presentable condition. All excavations left by removal of structures must be filled and compacted with clean suitable soil acceptable to the Engineer.
11.7 Certificate as to Compliance With Certain Regulations Contractor must file with Engineer, prior to the acceptance of the Work, a certificate in form substantially as follows:
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 20 -
CAM #4816-7464-0911 v5
I (We) hereby certify that all of the Work has been performed and materials supplied in accordance with the specifications, drawings, and Contract Documents for the Work and that:
(a) no less than the prevailing rates of per diem wages as ascertained by the Director of Industrial Relations has been paid to workers employed on this Work and a copy of these rates has been posted and maintained at the Work site at all times during the course of the Work;
(b) there have been no unauthorized substitutions of subcontractors; nor have any unauthorized subcontracts been entered into;
(c) no subcontract was assigned or transferred or performed by anyone other than the original subcontractor, except as provided in the Subletting and Subcontracting Fair Practices Act, Public Contract Code section 4100 and following; and
(d) all claims for materials and labor and other services performed in connection with the Contract Documents have been paid.
12. Claims between Cit
y and Contractor
12.1 Definition of Claim
As used in this section, “claim” means a separate demand by Contractor, sent by registered mail or certified mail with return receipt requested, for (1) a time extension ( including, without limitation, for relief from damages or penalties for delay assessed by the City), (2) payment of money or damages arising from Work done by or on behalf of Contractor pursuant to the Contract and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or (3) an amount the payment of which is disputed by City.
12.2 Notice of Potential Claim Procedure
(a) Contractor agrees that it may not be entitled to the payment of any additional compensation for any claim that may be based on any act, or failure to act, by the Engineer, including failure or refusal to issue a change order, RFI response, or for the happening of any event or occurrence, unless the Contractor has given the Engineer written notice of a potential claim as provided in this subsection.
(b) The written notice of a potential claim must be submitted on the City’s claim form and certified with reference to the California False Claims Act, Government Code sections 12650-12655. The written notice of potential claim must include the following information:
(1) The complete nature and circumstances of the dispute which caused the potential claim.
(2) The Contract provisions that provide the basis of the claim. (3) The estimated cost of the potential claim, including an itemized breakdown of individual costs and how the estimate was determined. (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 21 -
CAM #4816-7464-0911 v5
(4) A time impact analysis of the project schedule that illustrates the effect on the scheduled completion date due to schedule changes or disruptions where a request for adjustment of contract.
(c) The written notice of potential claim must be submitted to the Engineer prior to the time that the Contractor performs any additional work giving rise to the potential claim for additional compensation, if based on an act or failure to act by the Engineer and for which is not expressly provided for under this Contract. The Contractor must provide the Engineer the opportunity to examine the site or Work and respond within five business days from the date the notice of potential claim was submitted to the Engineer. The Contractor must then proceed with the performance of the additional work unless otherwise specified or directed by the Engineer.
When the affected work is completed, the Contractor must submit substantiation of the Contractor’s actual costs and total amount of the claim within 10 days of completing the work.
Failure to do so will be sufficient cause for denial of any claim subsequently filed on the basis of the notice of potential claim.
(d) In all other cases, the written notice of potential claim must be submitted to the Engineer within 15 days after the happening of the event, occurrence or other cause, giving rise to the potential claim.
12.3 Claim Processing Procedure
All claims for which a written notice of potential claim was filed and which claim is not resolved promptly resolved under subsection 12.2 will be processed and resolved in accordance with Public Contract Code section 9204, which is hereby incorporated by this reference, and the provisions of section 9204 are generally set forth in this subsection. This subsection and the requirements of Public Contract Code will not preclude the claimant and City from entering into a written waiver of the claim processing procedures outlined in this subsection and electing to resolve the dispute by arbitration pursuant to Public Contract Code section 10240 and following.
(a) The claimant must submit a written claim that includes reasonable documentation necessary to substantiate the claim.
(b) Upon receipt of the claim, the City and the claimant may, by mutual written agreement, extend the time period for the City to respond to the Contractor’s claim. (c) City will respond in writing to any written claim within: (i) 45 days of receipt of the claim; (ii) the extended time period according to Section 12.3(b); or (iii) where the City Council does not meet within 45 days or the extended time period, three days after the next duly publicly noticed meeting on calendar.
(d) The City’s written response will identify the disputed and undisputed portions of the claim, and the City will process payment for any undisputed claims within 60 days after the written statement referenced in Section 12.3(c). If the claimant disputes City’s written response, or City fails to respond within the time prescribed in Section 12.3(c), the claimant may so notify City, in writing, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon a demand, City will schedule a meet and confer conference within 30 days for settlement of the dispute.
(e) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City will provide the (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 22 -
CAM #4816-7464-0911 v5
Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the City issues its written statement. (f) Any disputed portion of the claim, as identified by the claimant in writing, must be submitted to nonbinding mediation, with the City and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators may select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party bear s the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute may be resolved through other means, including civil action or arbitration in accordance with Public Contract Code sections 20104.4 and 20104.6.
13. Assignment of Rights
In entering into this Contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or subcontractor offers and agrees to assign to City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700 of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment will be made and become effective at the time City tenders final payment to Contractor, without further acknowledgement by the parties. (Pub. Con. Code § 7103.5.)
14. Prohibited Interests
No official, employee, or agent of City, nor any member of their immediate family, may have any direct or indirect interest in this Contract.
15. Labor Code Requirements
15.1 State Wage Determination
(a) Under California Labor Code section 1770 and following, Contractor must pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are on file at the office of the Owner, which copies must be made available to any interested party on request, and are also available on the Internet at the website of the Department of Industrial Relations: http://www.dir.ca.gov/dlsr/PWD/index.htm. Contractor must post a copy of such determination at each job site.
(b) Under Labor Code section 1775, Contractor will, as a penalty to Cit y, forfeit the statutory penalty each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the Director for such work or craft in which such worker is employed for any public work done under the Contract by it or by any subcontractor under it. (c) Contractor must comply with all provisions of Labor Code section 1775.
(5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 23 -
CAM #4816-7464-0911 v5
15.2 Compliance Monitoring
(a) The Work is subject to prevailing wage compliance monitoring and enforcement by the Department of Industrial Relations (Labor Code § 1771.4). (b) Pursuant to Labor Code section 1771.4, Contractor and its subcontractor(s) must furnish the payroll records specified in Labor Code section 1776 directly to the Labor Commissioner and to the City, in the following manner:
(1) At least monthly or more frequently if specified in the contract with the awarding body.
(2) In a format prescribed by the Labor Commissioner.
(c) Contractor must post job site notices, as prescribed by regulation (Labor Code § 1771.4).
(d) If the City determines based on its review of the Contractor ’s or any of its subcontractor’s certified payroll records that the Contractor or any subcontractor has underpaid its employees, then upon the second occurrence of such underpayment, the City reserves the right to obtain a certified payroll compliance monitoring consultant to assist the City in the additional work required to ensure Contractor or any subcontractor compliance and the associated costs will be the responsibility of the Contractor and will be deducted from Pay Estimates due to the Contractor.
15.3 Payroll Records
(a) Under Labor Code section 1776, Contractor and each subcontractor must keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by it in connection with the public work.
(b) The payroll records enumerated in subsection (a) above, must be certified and made available for inspection at all reasonable hours at the principal office of Contractor on the following basis:
(1) A certified copy of an employee’s payroll record must be made available for inspection or furnished to the employee or his or her authorized representative on request.
(2) A certified copy of all payroll records enumerated in subsection (a) must be made available for inspection or furnished upon request to a representative of the body awarding the Contract, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards of the Department of Industrial Relations.
(3) A certified copy of all payroll records enumerated in subsection (a) must be made available upon request by the public for inspection or copies thereof made. However, a request by the public must be made through either the body awarding the Contract, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement. If the (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 24 -
CAM #4816-7464-0911 v5
requested payroll records have not been provided pursuant to subparagraph (2) above, the requesting party must, prior to being provided the records, reimburse the costs of preparation by Contractor, subcontractors, and the entity through which the request was made. The public may not be given access to the records at the principal offices of Contractor.
(c) Contractor or any subcontractor must file a certified copy of the records enumerated in subsection (a) with the entity that requested the records within 10 days after receipt of a written request.
(d) Any copy of records made available for inspection and copies furnished upon request to the public or any public agency by City, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement must be marked or obliterated in such a manner as to prevent disclosure of an individual’s name, address, and social security number. The name and address of Contractor or any subcontractor performing the contract may not be marked or obliterated.
(e) Contractor must inform City of the location of the records enumerated under subsection (a), including the street address, city and county, and must, within five working days, provide a notice of change of location and address.
(f) Contractor or any subcontractor has 10 days in which to comply subsequent to r
eceipt of written notice requesting the records enumerated under subsection (a). In the event of noncompliance with the requirements of this Section, Contractor must, as a penalty to the state or City, forfeit the statutory penalty for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. These penalties will be withheld from progress payments then due. Responsibility for compliance with Section 15. 3 (a) through (f) lies with Contractor.
(g) For all projects, the payroll records enumerated in subsection 15.3 ( a) above, must be delivered to the Labor Commissioner (no event less frequently than monthly) directly to the Labor Commissioner in the format prescribed by the Labor Commissioner. (h) For federally f unded projects, Contractor must submit certified payroll records weekly to the Engineer.
(i) Upon request, Contractor must submit backup documentation for certified payroll records including cancelled checks, proof of payment of fringe benefits, time cards, apprenticeship documentation, and other backup records.
15.4 Apprentices
(a) Contractor must comply with Labor Code section 1777.5 and following, and Title 8, California Administrative Code section 200 and following, with respect to apprentices . To ensure compliance and complete understanding of the law regarding apprentices, and specifically the required ratio thereunder, Contractor and subcontractors should, where some question exists, contact the Division of Apprenticeship Standards prior to commencement of the Work. Responsibility for compliance with this Section lies with Contractor. City policy is to encourage the employment and training of apprentices on its construction contracts as may be permitted under local apprenticeship standards. These provisions require that contractors and subcontractors submit contract award information to the applicable joint apprenticeship (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 25 -
CAM #4816-7464-0911 v5
committee, employ apprentices in apprenticeable occupations in a ratio of not less than one hour or apprentice’s work for every five hours of labor performed by a journeyman (unless an exception is granted in accordance with Section 1777.5), contribute to the fund or funds in each craft or trade or a like amount to the California Apprenticeship Council, and that contractors and subcontractors may not discriminate among otherwise qualified employees as apprentices solely on the ground of sex, race, religion, creed, national origin, ancestry or color. Only apprentices as defined in Labor Code section 3077, who are in training under apprenticeship standards and who have written apprentice agreements may be employed on public works in apprenticeable occupations. The responsibility for compliance with these provisions is fixed with the prime contractor for all apprenticeable occupations. Contractor agrees to provide Division of Apprenticeship Standards (DAS) Form 13 or any successor apprenticeship reporting form to City no later than the time of Contractor’s execution of the Contract Documents. (b) Contractor must comply with the requirements of Form FHWA 1273 (for federally funded projects), and Labor Code sections 1777.5 and 1776. In the event of conflict between the provisions, Contractor must comply with the most stringent provision that requires the largest number of apprentices.
15.5 Working Hours
(a) Contractor must comply with all applicable provisions of Labor Code section 1810 and following relating to working hours. Contractor will forfeit the statutory penalty to City for each worker employed in the execution of the Contract by Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week, unless such worker receives compensation for all hours worked in excess of eight hours at not less than one and a half (1 -1/2) times the basic rate of pay. Contractor must comply with all requirements for payment of overtime and holiday rates of pay. (b) City may withhold from any monies payable on account of Work performed by Contractor or any subcontractor, such sums as may administratively be determined to be necessary to satisfy any liabilities of such Contractor or subcontractor, for unpaid wages and liquidated damages as provided for in subsection (a), above.
15.6 Workers Compensation
(a) Under Labor Code sections 1860 and 3700, Contractor is required to secure the payment of compensation of its employees.
(b) Under Labor Code section 1861, Contractor must sign and file with City the following certification prior to performing the Work of the Contract: “I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for worker’s compensation or to undertake self -insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work of this Contract.”
15.7 Protection of Workers in Trench Excavations
As required by Labor Code section 6705, whenever Work under the Contract involves the excavation of any trench or trenches five feet or more in depth, Contractor must submit for acceptance by City or by a registered civil or structural engineer, employed by City, to whom authority to accept has been delegated, in advance of excavation, a detailed plan (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 26 -
CAM #4816-7464-0911 v5
showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation, of such trench or trenches.
If such plan varies from the shoring system standards established by the Construction Safety Orders of the Division of Industrial Safety, the plan must be prepared by a registered civil or structural engineer employed by Contractor, and all costs therefor will be included in the price named in the Contract for completion of the Work as set forth in the Contract Documents.
Nothing in this Section may be deemed to allow the use of a shoring, sloping, or other protective system less effective than that required by the Construction Safety Orders. Nothing in this Section may be construed to impose tort liability on City, the City Engineer, nor any City officers, agents, representatives, or employees. Unless a specific bid item is included in the Bid Proposal, payment for protection of workers in excavations requiring adequate sheeting, shoring, bracing and other safety provisions must be included in the bid item for mobilization. A separate item must be shown in the schedule of values for protection of workers in trench excavations. Contractor must obtain all necessary permits for excavation work from Cal/OSHA at Contractor’s expense.
16. Sales and Use Tax Cooperation
Contractor must take all steps reasonably necessary, as instructed by the Director of Finance, with respect to collection and reporting California Sales and Use Tax, to ensure that, to the extent legally possible, sales and use taxes collected for personal property purchased pursuant to this Contract, are reported with a point of sale within City.
17. Documentation of Status of Surety
Contemporaneously with the filing of a bid bond, labor and materials bonds, and faithful performance bond (or others), Contractor must obtain and file with City from the following documents:
(a) a certified copy of the unrevoked appointment Power of Attorney, By Laws or other instrument entitling or authorizing the person who executed the bond to do so; and (b) a certified copy of the Certificate of Authority of the issuer issued by the Insurance Commissioner of the State of California; and
(c) a certificate from the Clerk of the County where the principal office of the issuer is located that the Certificate of Authority of the issuer has not been surrendered, revoked, cancelled, annulled or suspended, or, in the event that it has been surrendered, revoked, cancelled, annulled or suspended, that renewed authority has been granted; and (d) copies of the insurers’ most recent annual statement and quarterly statement filed with the Department of Insurance pursuant to Article 10 of Chapter 1 of Part 2 of Division 1 of the Insurance Code (section 900 and following).
18. Construction and Demolition Waste
Contractor must provide an accurate estimate of the amount of construction debris recycled as a result of the project. Any materials that could have been disposed of in a landfill, but were instead processed and reused on the project or elsewhere will be considered recycled.
Amounts must be itemized with description of the items recycled and must be reported in either cubic yards or tons (see Appendix). Examples of recycled construction debris are: asphalt concrete grindings, chunks of broken asphalt concrete, PCC chunks, base, soil, metals, and (5-2023)
GENERAL CONDITIONS/SPECIFICATIONS
- 27 -
CAM #4816-7464-0911 v5
other similar materials. Contractor must sign the estimate of recycled construction debris and must certify that the estimate is accurate to the best of contractor’s knowledge. Contractor must provide this estimate prior to submittal of the final pay estimate and at such other reasonable intervals during the course of the project as requested by the Engineer.
19. Use of Premises
(a) The Work must be confined to City owned or controlled land or right -of-way as shown on the plans, unless otherwise expressly provided in the Contract Documents. If the right- of-way is not shown on the plans, the Contractor must field verify the right-of-way at no additional cost to the City. Contractor must provide at Contractor’s own expense and without liability to the City any additional land and access thereto that Contractor may desire for temporary construction facilities, or for storage and staging of materials.
(b) Contractor may not trespass upon or in any way disturb property adjacent to City owned or controlled land or right -of-way or outside any permanent or temporary project construction easements without first obtaining written permission from the applicable property owner. A copy of such written permission must be furnished to the Engineer. (c) If Contractor finds it necessary to obtain additional working area, it is the responsibility of Contractor to negotiate permissions, obtain applicable permits and pay all costs pertaining to the additional work area.
(d) If additional work area is required and obtained, the following requirements will apply:
(1) Contractor must restore such property to the full satisfaction of the property owner at no additional cost to the City, and must obtain from the property owner a written release stating that restoration has been satisfactorily made. Contractor must provide the Engineer a copy of the written release from the property owner.
(2) Contractor may not place or dispose any excess earth, stone, or other excavated material on any property without first obtaining necessary permits and written permission of the owner of the property and securing the approval of the City Engineer. Contractor must provide the Engineer with one copy of the property owner's written permission and one copy of a written release from the property owner stating that the work has been completed to the satisfaction of the property owner.
(3) All items within any City owned or controlled land or right-of-way or within any permanent or temporary construction easements must be removed, or removed and replaced, or restored as required by the Plans and Specifications, as directed by the Engineer.
CITY OF CAMARILLO
DEPARTMENT OF PUBLIC WORKS
ADVANCED METERING INFRASTRUCTURE -
PROJECT NO. WT-5080
The following technical specifications have been prepared under the direction of the following professional Civil Engineer, licensed by the State of California
Designed by:
Meter SYS LLC
99 South Almaden Blvd.
San Jose, CA 95113
Project Manager:
Lauren Brown Date
Reviewed by:
Ryan Lippincott, P.E. D ate
Registered Civil Engineer #81989
Exp. 03/31/2026
Specification No. WT-5080 TOC
Special Provisions
SPECIAL PROVISIONS
TABLE OF CONTENTS
SECTION 2000 GENERAL
SECTION 2001 MOBILIZATION
SECTION 2002 TRAFFIC CONTROL, PARKING RESTRICTIONS AND SIGNAGE SECTION 2003 STORMWATER POLLUTION CONTROL PLAN (SWPCP)
SECTION 2004 MEASUREMENT AND PAYMENT
SECTION 2005 COMPENSATION
SECTION 2006 CONCRETE
TECHNICAL SPECIFICATIONS
01 42 10 ARCONYMS
01 73 19 GENERAL INSTALLATION AND NON-STANDARD INSTALLATION REQUIREMENTS 01 79 00 TRAINING
01 93 10 MAINTENANCE AND SUPPORT
33 09 09 SOFTWARE
33 09 11 SOFTWARE SECURITY
40 91 15 METERS
40 91 16 NETWORK
40 91 17 TRANSMITTERS
40 97 50 SMART SENSORS
APPENDICES
Specification No. WT-5080 Section 2000
Special Provisions Page 1
SECTION 200 0 – GENERAL
2000-1 General Description of the Work
A. The work to be performed includes but is not limited to:
1. Furnishing all labor, materials, tools, and equipment necessary to : install advanced metering infrastructure (AMI) across the City’s service territory to include the upgrade or replacement of the City’s water meters, the installation of a communications network connected to the upgraded meters, and a software solution integrated with the City’s utility billing system for automation of meter reading and billing.
2. Mobilization and demobilization; developing and implementing a work area stormwater pollution control program; implementing a new meter reading system including AMI compatible water meters at locations older than three (3) years, retrofit of existing meters installed after December 31, 2020, replacement of meter boxes and lids, and installation of all necessary network equipment in accordance with these contract documents.
2000-2 Standard Specifications and Details
A. The work provided herein must conform to and be in accordance with the Contract Plans, General Conditions/Specifications and Special Provisions, as well as the 2021 edition Standard Specifications for Public Works Construction (”SSPWC”), written and promulgated by the Public Works Standards, Inc.; herein referred to as the “Standard Specifications”, the State of California Department of Transportation Standard Specifications; hereinafter referred to as the “State Standard Specifications”, California Manual on Uniform Traffic Control Devices (CMUTCD), City of Camarillo (City) Standards, City of Camarillo Water Division Standards, and City of Camarillo (City) Standards.
B. Whenever in the Contract Documents references are made to published specifications, codes, standards, or other requirements, it is understood that if a date is not specified, only the latest specifications, standards, or requirements of the respective issuing agency which have been published as of the date that the Work is advertised for bids will apply; except to the extent that such standards or requirements may be in conflict with applicable laws, ordinances, or governing codes. No requirements set forth herein or shown on the drawings will be waived because of any provision of, or omission from, the standards or requirements.
2000-3 Order of Wo
rk
A. The contractor shall start work on or after the following dates:
1. Base Bid: Notice to Proceed
2. Additive Alternate Bid 1: July 1, 2025
3. Additive Alternate Bid 2: July 1, 2026
B. The Contractor must control operations such that the following general conditions can be met:
1. All work shall be coordinated with project plans, project schedule, contract period, submittals, Stormwater Pollution Control Plan, and all other requirements of these Contract Documents.
Specification No. WT-5080 Section 2000
Special Provisions Page 2
2. Contractor shall provide City five (5) calendar days’ notice for readiness for mobilization.
C. The following activities generally describe the sequence of the Work:
1. Provide submittals for critical path as required, including stormwater pollution control plan.
2. Conduct site inspections corresponding to the proposed network design and complete the site plan following the sample format in Appendix C for each site as outlined in the technical provisions including power requirements and backhaul network (utilizing existing fiber and wireless mesh network).
3. Vendor to provide site plans for each network device and attachment requirements, complete with roles and responsibilities for each component, and drawings that detail site specifics, such as mounting, power, equipment placement, and site preparation. A list of proposed materials to be used for each location must be included within the plan submittals. Vendor to submit Network Acceptance Plan meeting Appendix D requirements for review and approval.
4. Provide all activities associated with the Head End System (HES) and Meter Data Management System (MDMS) and the interfaces with the City’s Customer Information System (CIS) and the City’s customer engagement platform (WaterSmart).
5. Develop file requirements and mapping for all key interfaces.
6. Evaluate sample files (CIS Export, Swap File, Read/Bill File).
7. Develop and test key interfaces.
8. Develop a file transfer and scheduler process to automate file exchanges.
9. Installation field tool configuration, testing, and acceptance.
10. Installation checklist finalized and accepted.
11. Install test transmitters and validate proper data collection, transmission, and processing for both the register/transmitter and field installation.
12. Set up and test meter swap file and field installation software for proper tracking of field data and installation procedures.
13. Conduct meter exchange based on approved routes and schedules.
14. Prepare meter box lids for proper RF transmission that may involve lid drilling or lid replacement.
15. Remove and replace existing meters for all water service locations listed in the final primary meter file.
16. Retrofit meters identified in the field work order system by replacing the register and installing the new AMI transmitter.
17. Commission the meter/transmitter and ensure all configurations were properly setup and confirm installation was correctly performed by validating successful connectivity to the network.
18. Complete all site data capture, including photos, asset information and special notations in data handheld for electronic transfer to utility.
19. Properly manage and track any return to utility (RTU) or skip accounts.
20. Conduct installation quality checks and data quality controls to ensure successful acceptance of routes by the City following quality inspection findings. Vendor to submit Route Acceptance Plan meeting the requirements of Appendix F for review and approval.
21. Provide training as defined in the technical standards such that staff displays the acceptable level of proficiency in field asset management and software utilization.
22. Demobilize, project closeout, and City acceptance.
Specification No. WT-5080 Section 2000
Special Provisions Page 3
2000-4 Requirements of the Work
A. All Work must be coordinated with the Project Schedule, Contract Duration, Submittals, and other requirements of these Contract Documents.
B. Extended work hours must be approved by City prior to performing the specific work.
Contractor may submit a written request to City for extended work hours for specific portions of work as required for public safety and convenience or emergency. City denial of the Contractor’s request for extended work does not warrant an extension of the Contract Time.
C. A maximum noise level limit of eighty-six (86) decibels at a distance of fifty (50) feet will apply to all construction equipment on or related to the project whether owned by the Contractor or not. The use of excessively loud warning signals must be avoided except in those cases required for protection of personnel. The use of generators or other mechanical devices between the hours of 4:30 p.m. and 8:30 a.m. is not permitted unless approved by the Engineer.
D. The City reserves the right to direct the order of work in the interest of Public safety and convenience. The Engineer will endeavor to give the Contractor 72 hours notice of any such directed order of work.
E. No work may be performed on Saturday, Sunday, or holidays unless approved in advance by the Engineer. Holidays are anticipated as follows:
Holiday: Dat
e:
New Years Day (January 1)
Martin Luther King Day (3rd Monday in January)
Presidents Day (3rd Monday in February)
Memorial Day (last Monday in May)
Independence Day (July 4th)
Labor Day (1st Monday in September)
Veterans Day (November 11th)
Thanksgiving Day (4th Thursday in November)
Day after Thanksgiving (4th Friday in November)
Christmas Eve (December 24th)
Christmas Day (December 25th)
Note: If a holiday falls on a weekend, a Saturday holiday will be observed on Friday and a Sunday holiday will be on a Monday. If part or all of a 2-day holiday falls on a weekend, the City will determine which 2 weekdays will be holidays.
The holiday and event dates listed above are approximate dates and will vary depending on the year construction occurs. The Contractor is required to obtain and account for the City’s observed holiday dates and special event dates that will impact the project during the course of the Contract.
F. Contractor must reimburse City for costs for overtime inspection associated with project work hours. Costs will include hours in excess of 8- hours per workday shift, Specification No. WT-5080 Section 2000
Special Provisions Page 4
hours in excess of 40- hours per work week, and weekend and holiday work when specifically authorized.
G. The Contractor must diligently prosecute the contract work within the allowed number of working days for each bid Schedule as detailed on Page 1 of the Bid Proposal, counting from the date stated in the Notice to Proceed. The days to finish the punch list, provided by the City, are included in the working days.
2000-5 Wor
k Hours
A. Work shall occur during the following time periods:
a. Normal daily work hours are from 7:30 a.m. to 5:00 p.m. b. For installation work taking place in major streets and/or in front of businesses, installers should plan to start work no earlier than 8:00am. c. Installation Contractor is required to coordinate with any businesses to schedule commercial meter replacement (not required for retrofit only) in an effort to minimize any impacts to the business operations. For any businesses where the Contractor is unable to get in touch with someone to schedule the work, the City will support and coordinate as needed.
B. If the contractor performs any work or has any site presence outside the hours listed in this section, or on weekends or holidays without prior City approval, the City reserves the right to hire a security service to ensure contractor compliance and associated costs will be the responsibility of the contractor and will be deducted from Pay Estimates due to the contractor.
2000-6 Public Notification and Project Signs
A. Contractor shall give the City 60 calendar days’ notice before starting the replacement of meters on a meter reading route. This time allows the City to properly notify customers prior to the contractor interrupting water service.
B. Contractor shall provide call-line for customer inquiries and complaints. In response, Contractor should describe capabilities, hours of operation, ability to track/record calls, and notification and escalation processes.
C. Contractor will be responsible for displaying at all times vehicular magnets or tags identifying as a Contractor of the City of Camarillo.
2000-7 Permits
A. Before beginning work, Contractor must confirm with agencies having jurisdiction that Contractor has obtained all necessary permits and licenses and given all notices.
B. Contractor must apply for, procure, and pay all charges and fees for all other necessary permits and licenses required to perform the work. Contractor is responsible for obtaining all necessary permits (not provided by City), reviewing the conditions and requirements contained therein, and including the cost of meeting these conditions and requirements in this bid. Contractor shall be responsible for obtaining permit extensions including extensions for three (3) months beyond the baseline completion date. The original permits must be submitted to City and Contractor must maintain a copy of these permits at the job site at all times. All Specification No. WT-5080 Section 2000
Special Provisions Page 5
provisions of all project permits (including those provided by City and obtained by Contractor) will apply as though stated in these Specifications. Contractor must follow the more restrictive of the conditions, as determined by the Engineer, if there is a conflict. Any costs incurred due to compliance with these permits must be included in the contract costs. No additional payment will be made for such permits.
C. Project will not disturb more than one acre of soil, therefore, the State General Construction Permit is not required. However, Contractor must comply with the Ventura County Municipal Stormwater Permit No. CAS004002 and provide a Stormwater Pollution Control Plan (SWPCP) before commencing work in accordance with Section 2003.
D. Full compensation for conforming to the requirements of this section will be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed.
2000-8 Fees and Fi
nes
A. If the City receives a fine or penalty due to the Contractor’s actions or inactions, Contractor will be responsible to pay such cost. City may deduct such amount from amounts due, or to become due the Contractor.
2000-9 Review of Contract Documents and Job Site
A. The Contractor must carefully study and compare each element of the Contract Documents with each other and with information available to the Contractor as furnished by the City. The Contractor will assume all responsibility for deductions and conclusions as to the difficulties in performing the work.
B. The Contract Documents show conditions as they are supposed, or believed by the City to exist. The City does not warrant the completeness or accuracy of such information. It is the Contractor’s responsibility to ascertain the existence of all conditions affecting the cost of work. The Contractor must immediately notify the Engineer of errors, inconsistencies or omissions discovered. If the Contractor performs any construction activity knowing it involves a recognized error, inconsistency or omission in the Contract Documents without such notice to the Engineer, the Contractor will assume appropriate responsibility for such performance and will assume responsibility for the cost of correction.
2000-10 Right-of-W
ay
1. Attention is directed to Section 19 “Use of Premises” of the General Conditions/Specifications and these Special Provisions.
2. The Contractor must verify that the acquisition(s) is completed prior to beginning any work outside the public right of way. All cost for remobilization, downtime, etc., due to delays in obtaining the required rights of way, easements, and rights of entry must be included in the lump sum price bid for the various items of work and no additional compensation will be allowed.
3. The Contractor will not be entitled to the exclusive use of any public street or rights- of-way during the performance of the work under the contract, and the Contractor must conduct operations so as not to interfere unnecessarily with business, traffic, pedestrians, and the authorized work of utility companies or other agencies in the Specification No. WT-5080 Section 2000
Special Provisions Page 6
street or rights-of-way. Neither the Specifications nor the Plans may be construed to entitle the Contractor to conduct operations within the rights -of-way which are in violation of any local, county, or state ordinance or regulation restricting interference with water courses and drainage channels. The Contractor must take adequate precaution against obstructing storm water flow within the project limits. The Contractor may not deposit excavated materials, store equipment or construction materials within the street.
2000-11 Surveying
A. Contractor shall be responsible for any and all survey Work required for the Project.
2000-12 Protection and Restoration of Existing I mprovements A. Attention is directed to Section 400 “Protection and Restoration” of the Standard Specifications and these Special Provisions.
B. Contractor agrees to assume sole and complete responsibility for protection of public and private property in the vicinity of the job site and further agrees to, at Contractor's expense, repair or replace to original condition all existing improvements within or in the vicinity of the job site which are not designated for removal and which are damaged or removed as a result of Contractor's operations.
C. Repair or replacement must be completed within three (3) working days from the date the damage occurred, unless immediate repair or replacement is determined to be necessary by the Engineer. If the Contractor fails to restore existing improvements in a timely manner, within the timeframe specified, the City may complete the work and costs will be deducted from payments due the Contractor.
D. Contractor must coordinate operations such that damage to newly constructed improvements is avoided. In the event newly constructed improvements, shown on the Contract Documents, interfere with other project work or is necessary for safety or access and must be removed and replaced, the City will only pay for the improvements to be constructed one time. Multiple replacements or work necessary for the convenience of the Contractor will be considered performed at the Contractor’s expense.
E. Existing improvements, visible at the Work or which can be reasonably ascertained by available information to exist, and which interfere with the completion of the Work but which no specific disposition is made on the Plans or Specifications, shall be addressed by the Contractor as follows:
1. Existing improvements which interfere with the completion of the Work shall be removed and replaced, in kind. The exact location and alignment of the replacement shall be confirmed with the Engineer prior to removal and adjustments to the location to conform to the Work shall be made as necessary.
2. The Engineer may determine that the existing improvements are to be removed and not replaced. Removed improvements shall be properly disposed of by the Contractor.
3. The area where existing improvements were removed shall be restored to conform with the Work and match the surrounding area. Restoration shall conform to adjacent improvements.
Specification No. WT-5080 Section 2000
Special Provisions Page 7
4. All costs for addressing proposed improvements in conjunction with existing improvements shall be included in the bid.
2000-13 Utility Requirements and Potholing
General
Attention is directed to Section 402 “Utilities” of the Standard Specifications (SSPWC), the contract Plans, and these Special Provisions. The Contractor must verify the location, size, and type of all existing utilities prior to construction, and restore utility potholing location with backfill and finished surface to match existing condition. Utilities include, but are not limited to; telephone, electricity, gas, fiber -optic cable, cable television lines, traffic signal systems, communication systems, petroleum lines, water, irrigation systems, storm drains, site drains, process piping, and sanitary sewer.
When the Plans or Specifications provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such work must be included in the Bid for the items of work necessitating such work. Temporary or permanent relocation or alteration of utilities requested by the Contractor for its convenience are the Contractor’s responsibility and the Contractor must make all arrangements and bear all costs.
The Contractor must obtain all necessary permits and notify the utility agencies at least 48 hours in advance of excavating around any of their facilities. It is the responsibility of the Contractor to coordinate all phases of construction with the various utility companies involved.
The Contractor must notify Underground Service Alert at 811 at least 48 hours prior to any excavation or construction work. Paint indications for underground utilities must be limited to only those areas to be affected. The Contractor must document USA markings with photographs or video and must provide a copy of the photographs and video to the Engineer. The Contractor must remove any painting marks that remain after the construction is complete as follows:
When placing markings on the pavement or other right -of-way areas to indicate the location of underground facilities, Contractors and/or utility companies are required to use a temporary water based marking chalk with a visibility life not to exceed three (3) weeks. Contractor must arrange for markings to be removed as needed. In the event that a Contractor or utility company uses a non-approved marking material, it will be the responsibility of the Contractor to ensure the complete removal of all pavement markings remaining upon completion of the permitted work. If the Contractor fails to properly and completely remove all pavement markings, the City may affect the removal and deduct from payments due or become due the Contractor for both direct and indirect costs as determined by the Engineer.
Utility Verification
The Contractor must physically locate, verifying horizontal and vertical locations, and map existing underground facilities within the work area that are marked by Underground Service Alert (USA) or visible in the field, as needed. Contractor must protect all such facilities from damage due to construction activities for the duration of the project. In the event any such unknown facilities or substructures should be disturbed or damaged due to the failure of the Contractor’s exercising reasonable care, the Contractor must at once make necessary emergency repair at no cost to and to the Specification No. WT-5080 Section 2000
Special Provisions Page 8
approval of the owner. In the event the utility owner requires its own forces or approved vendors to perform such repairs, Contractor must coordinate and cooperate with the utility to complete the repairs. All costs for repairs, staff time, direct and indirect costs, and any costs billed by the utility must be borne by the Contractor and costs may be deducted from payments due or to become due the Contractor. Contractor is responsible for following all applicable rules and regulations concerning work in the vicinity of underground and/or overhead utilities.
All utilities to be protected in place must be carefully uncovered if located within the lines of excavation and time must be allowed for the Engineer to field check the location of such utilities to make certain that they will not interfere with construction. In the event a utility conflict exists, the City will either arrange for utility owner to relocate the utility or adjust grade and/or alignment of the proposed improvement. Contractor must allow sufficient time for this utility work and must adjust Contractor’s operation to move to other areas to allow the utility relocation work to occur.
In the event any such facility should be disturbed or damaged, the Contractor must at once make repairs to the satisfaction of the owner, or arrange with the owner to make repairs, at no cost to the City. Any delays or reconstruction of improvements resulting from the Contractor’s failure to verify utility locations and depths will be made at the Contractor’s expense.
Utility Company Work Requirements
A. Contractor must coordinate and schedule work with the various utilities. Contractor must be familiar with the utility company requirements, scheduling the work with adequate time in advance of needing utilities relocated, protected, installed or removed. In the event difficulties delay relocation, which in the judgment of the Engineer cannot reasonably be foreseen, and require a delay in Contractor’s completion date after all reasonable remedies for keeping contract on schedule have been exhausted by Contractor including, but not limited to flow -charts and critical path scheduling, work simplification, and alternative construction methods, Engineer may allow extra time to the Contractor, but no additional compensation will be allowed.
B. The Contractor must protect facilities “To Be Relocated By Others,” in both original and relocated positions and any damage to such facilities must be immediately repaired to the owner’s satisfaction at no cost to the City.
Payment
The cost for coordination with the utility companies, providing work areas for utilities, locating facilities including potholing, protecting utility facilities in place, and conforming to the requirements of this section will be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed.
2000-14 Subsurface Conditions
Where investigations of subsurface conditions have been made by the City with respect to subsurface conditions, utilities, foundation, or other structural designs, and that information is shown in the Plans, it represents only a statement by the City as to the character of materials which have actually been encountered by the City’s investigation.
This information is only included for the convenience of Bidders.
Specification No. WT-5080 Section 2000
Special Provisions Page 9
2000-15 Pre-C onstruction Job Site Video
A. A minimum of seven (7) calendar days prior to start of network installation, the Contractor must video all areas where network construction is to take place. Such videos (hard drive, usb drive or other approved media) must be provided to the Engineer before construction commences. These videos will serve as a record of the existing conditions for disputes arising from installation, and should therefore be taken along the line of construction and site access and staging areas at sufficient detail as necessary to clearly depict details of existing conditions. Video must document existing conditions, roadway, striping and all painted curb markings in the project area. The videos must be on usb drives viewable on a computer, taken in high quality color video 720p HD (1280x720p) minimum in MP4, AVCHD, MOV or h.264 format. All videos must be indexed and catalogued in such a manner that each photographed area is readily identifiable, and must also indicate the date and time (hour, minutes and seconds) on which the video was made. The Contractor must also video any unusual conditions encountered during construction that are not already a matter of photographic record. In the event damage to existing improvements occurs, the video will be available as a resource to determine existing conditions. In any areas where existing conditions cannot be determined by means of videos, the area must be restored as approved by the Engineer at Contr actor’s expense. All videos will become the property of the City. The videos will be required for each network site where a network device will be installed, and will only be required in advance of initial installation to document pre-existing conditions.
2000-16 Pre-B
id and Pre-Construction Conferences
A. A mandatory pre-bid meeting will be required for any interested vendor to attend in person at the City of Camarillo on the date indicated in the Notice Inviting Bids .
Additional details regarding the specific time and location will be shared with interested vendors in advance of the meeting.
B. The pre-bid meeting will allow the City to share additional details on the expected scope of work, and provide a tour of the potential network assets, common field scenarios including older, newer, residential, and commercial meter box settings.
C. The mandatory in- person pre -bid meeting will be required attendance for any qualified bidder, as the information shared will be important for an informed response to the bid.
D. A fter award, a pre-construction meeting will be conducted with the selected Contractor prior to commencement of construction at a time and place designated by the Engineer. Those attending the meeting must include, but not be limited to, the following:
1. The Contractor and superintendent who will be supervising the work for the duration of the project.
2. The City of Camarillo
3. The City’s Project Management Consultant
4. Any other representatives or vendors of the City as the City wishes to engage
E. Pre-construction conference will not be scheduled until the following has been submitted:
Specification No. WT-5080 Section 2000
Special Provisions Page 10
1. Construction Schedule.
2. Demolition Waste Recycle Plan/Statement.
3. Key Personnel, Telephone Numbers, and Emergency Telephone Numbers.
4. Storm Water Pollution Plan (SWPCP).
5. Emergency Response and Access Plan.
6. Log of Work-Related Injuries and Illnesses.
7. Job Hazard Analysis.
2000-17 Weekl y Project Schedule And Meetings
A. By Monday at 12 PM PST of each week, the Contractor must prepare and submit a detailed schedule of the work projected for the next three (3) weeks on a daily basis.
The Contractor must make revisions as required by the Engineer.
B. The Engineer will conduct a Weekly Project Status Meeting that must be attended by the Contractor, subcontractors, utility companies (as required) and the Engineer.
The meeting will have duration of approximately one hour. The meeting will be held on the day, time and location as determined by Engineer. The purpose of this meeting will be to discuss interfacing work, scheduling, problems, issues, and the like. If not previously submitted, the Contractor must submit the following to the Engineer at the beginning of the meeting:
1. Daily manpower and equipment utilization for the preceding week
2. Projected work for the next three (3) weeks on a daily basis.
C. The Contractor must attend all miscellaneous meetings as requested by the Engineer.
2000-18 Project Schedule
A. Attention is directed to Section 6 -1.1 “Construction Schedule” of the Standard Specifications, Section 6.1 “ Proposed Construction Schedule” of the General Conditions/Specifications and these Special Provisions.
B. The Contractor must update the Construction Schedule as specified in the Standard Specifications, the General Conditions/Specifications, or when directed by the Engineer. Preparation and updating of the Construction Schedule must be performed at Contractor's sole expense.
C. Failure by the Contractor to submit updated or revised Construction Schedules when required may prevent acceptance of progress payment requests by the Engineer until such updated or revised Construction Schedules have been submitted for review and have been accepted by the Engineer.
D. The Construction Schedule must include obtaining all necessary materials and equipment, and must reflect completing all work within the specified time, in accordance with these Specifications. Contractor must show completion of the project completely filling the Contract time, and may not show early completion. In the event, the Contractor requests early completion, Contractor must execute a no- Specification No. WT-5080 Section 2000
Special Provisions Page 11
cost Contract Change Order that reduces the number of Working Days allowed for completion to conform with such intended completion date.
E. Contractor must include in the schedule, detailed information for each operation.
When the project includes multiple streets or sites, Contractor must include detailed information for each street or site. When notifications or parking restrictions are required such dates must be included in the schedule.
F. Contractor must provide critical path schedules in legible hardcopy format and must also submit schedules with each update in electronic format compatible with MS Project or Primavera, as directed by the Engineer.
G. Full compensation for the required construction schedules and conforming to the requirements of this section will be considered as included in the contract prices paid for the various items of work involved and no additional compensation will be allowed.
2000-19 Coordination with Concurrent Projects
Several projects may be ongoing within the limits of the work during the Contract period.
The Contractor is required to coordinate the work with other contractors such that both projects can be diligently pursued to their timely completion. Interfacing w ork must be shown on the project schedule, and the Contractor will be responsible for meeting that schedule. Contractor must include time for others to perform work within the Work Area and this must be reflected in the Project Schedule. Delays due to interfacing with concurrent projects are considered avoidable and no compensation will be made therefore such delays. Contractor must include in the bid all costs for coordination, scheduling, meetings, staging and the like that result from interfacing with concurrent work.
Contractor is responsible for obtaining contract documents including plans and specifications and thoroughly understanding the requirements of and Work called for in the contract documents for the concurrent project. The Contractor must include in the bid all costs for Work called for or indicated in Contract Documents for this project even though shown in the contract documents prepared for concurrent projects.
2000-20 Submittals
In addition to the required submittals and shop drawings of the General Conditions, Standard Specifications , and Special Provisions, the Contractor must submit the following shop drawings and/or submittals in adequate detail, including a list of all deviations from the Contract Documents for each item submitted. The Contractor must submit electronic copies of the following items marked (*) to the Engineer for review at least five (5) working days prior to the Pre-Construction Conference. All other submittals must be submitted in accordance with the submittal procedures listed below. The Engineer will determine if the specifications are being met for all work including but not limited to the following:
General Requirements:
*Key Personnel, Telephone Numbers, and Emergency Telephone Numbers *Project Schedule
*Demolition Waste Recycle Plan/Statement
*Storm Water Pollution Control Plan (SWPCP)
Specification No. WT-5080 Section 2000
Special Provisions Page 12
*Permits (If applicable)
*Schedule of Values
Special Provisions:
*Network Site Plans
Training Program
AMI System Operating Instructions
Default System and Meter/Transmitter Configuration Details Detailed Cyber-Security and Disaster Recovery Plan
Warranty Program Details and RMA Instructions
AMI Software Architecture Diagram
AMI Integration and Interface Testing Plan
AMI Interface File Mapping Documentation
Sample Software as a Service Agreement
Scope of Work for AMI Deployment
Scope of Work for Ongoing AMI Support Services (Annual Maintenance Contract)
This list is for reference and may not be all inclusive. Contractor is required to submit any additional submittals required in the Special Provisions.
2000-21 Submittal Procedures
A. Wherever called for in the Contract Documents or where required by the Engineer, the Contractor must furnish to the Engineer for review electronic copies of each submittal.
B. Each submittal item must include a cover page, be individually and sequentially numbered, and identify the specification section that relates to item being submitted so that approved and rejected submittals can be tracked. Resubmittals must use a numeric or alphabetic identifier to indicate it is a resubmittal.
C. At the time of each submission, give Engineer specific written notice of each variation that the submittal may have from the requirements of the Contract Documents. If a variation is identified that was not brought to the attention of the Engineer, correction will be at the Contractor’s expense.
D. The Engineer will have a minimum of fifteen (15) working days to review each submittal except wh ere specified differently in these Special Provisions. It is the responsibility of the Contractor to organize submittals in order of importance and need.
E. Submittal review designations will be as follows:
1. Approved; As Submitted: Resubmittal not required. Submittal is accepted with no exceptions.
2. Approved; Make Corrections Noted: Resubmittal not required. Submittal is accepted with the exceptions or corrections noted.
3. Revise and Resubmit for Review: Resubmittal is required. Submittal is not accepted. Resubmittal must include correction to omissions or unacceptable items as identified by Engineer.
Specification No. WT-5080 Section 2000
Special Provisions Page 13
4. Rejected and Resubmit for Review: Resubmittal is required. Submittal includes significant omissions or unacceptable items and does not satisfy the Contract Document requirements.
5. Accepted for Information Only: Resubmittal is not required. Submittal is accepted by Engineer for information only.
F. Submittals must be clearly identified and where multiple items are shown on a shop drawing, items being identified as submittals must be marked. Extraneous information should not be included in submittals. Only one submittal will be reviewed for an item and Contractor may not submit multiple shop drawings from multiple vendors for the same item.
G. Engineer’s review will be only for conformance with the design concept of the project and for compliance with the information given in the Contract Documents, not extending to means, methods, techniques, sequences, or procedures of construction (except where indicated or required by the Contract Documents) nor to safety precautions or programs incident thereto. Submittals processed by Engineer do not become Contract Documents and are not Change Orders.
H. Delays caused by the need for re -submittal or replace unaccepted “or equal” items will not constitute a basis for claim.
I. In the event that an item is called for by a specific product or trade name, Contractor will have 35 days after the award of the Contract for submission of data substantiating a request for a substitution of “an equal” item. In the event Contractor furnishes any “or equal” material more expensive than that specified in the bid form, the difference in cost of such material so furnished will be borne by Contractor under Public Contract Code section 3400.
“Or equal” products may be accepted by the Engineer upon submittal of the following information:
1. Product Date Design Criteria
2. Physical Properties Limitations of Process
3. Material Specifications List of Previous Projects
4. Installation Specifications Size of Completed Projects
5. Testing Methods List of Current Projects
6. Third Party Test Data
7. Size of Current Projects
8. References (All references must include current names and telephone numbers).
9. List of all deviations from the specifications or referenced product or materials.
10. Additional testing may be required, and all costs for testing will be borne by Contractor.
J. City reserves the right to modify the procedures and requirements for submittals, as necessary to accomplish the specific purpose of each submittal. Direct inquiries regarding the procedure, purpose, or extent of any submittal to the Engineer.
K. Repetitive Review
1. Shop drawings and other submittals will be reviewed no more than twice at the City’s expense. All subsequent reviews will be performed at times convenient to Specification No. WT-5080 Section 2000
Special Provisions Page 14
the Engineer and at the Contractor’s expense, including but not limited to consultant costs, staff charges, overhead, and other related expenses.
Contractor shall reimburse the City for such costs, and City may deduct these costs from amounts due or to become due the Contractor. Submittals are required until approved.
2. Any need for more than one resubmission, or any other delay in obtaining Engineer’s review of submittals, will not entitle Contractor to extension of the Contract Time.
2000-22 Lump
Sum Bid Items
A. The Contractor must submit a detailed schedule of values breakdown for all lump sum bid items. The breakdown of items must be submitted to the Engineer for approval and the level of detail will be as determined appropriate by the Engineer.
The schedule of values must be submitted to the Engineer prior to the first progress payment request and the progress payment will not be reviewed without approved schedule of values for all Lump Sum bid items. The schedule of values will be used as a basis for determining appropriate monthly progress payment amounts for lump sum bid items. The schedule of values must equal, in total, the lump sum bid item cost and be in such form and sufficiently detailed to satisfy the Engineer that it correctly represents a reasonable apportionment of the lump sum.
B. Payment for the cost of materials and equipment delivered to the work site but not incorporated in the work will be included in the progress estimate if, prior to the closure date for the monthly progress payment, the material or equipment is listed by the Contractor on a submittal form together with date of delivery, vendor's or Subcontractor's name and cost; is accompanied by a copy of an invoice showing the cost thereof; has an individual item cost or an aggregated cost for a single type of item of $100,000 or more; is currently on the work site at an approved location and in good condition.
Unit price bid items will only be paid after item is installed and completed.
Delivered materials will not be paid.
On lump sum bid items, the amount paid for materials and equipment delivered and not incorporated in the Work shall not exceed 75% of the item in the approved schedule of values.
Should materials or equipment previously paid for be damaged, destroyed, stolen or removed from the work site, the payment previously made therefor will be deducted from the next progress payment, unless such materials or equipment are replaced prior thereto.
On the closure date for progress payments, the Contractor shall certify that all materials and equipment not incorporated into the work, for which payment has previously been made or is being requested, is still at the work site and in good condition. Failure to provide such certification will be cause for deducting previous payments for materials not incorporated in the work from the amount due the Contractor in the progress payment.
Payment for materials or equipment, as provided herein, shall not constitute approval or acceptance thereof nor shall such payment modify or abridge any of Specification No. WT-5080 Section 2000
Special Provisions Page 15
the rights the Owner has under the Specifications or at law nor relieve the Surety of any of its obligations under the bonds.
2000-23 Daily Report
A. The Contractor must complete a Daily Report indicating manpower, major equipment used and on standby (itemized separately), subcontractors, materials used, and similar items involved in the performance of the Work. The Daily Report must be completed on forms prepared by the Contractor and acceptable to the Engineer, and must be submitted to the Engineer prior to construction on the subsequent workday.
B. Contractor must supply daily reports to the Engineer and I nspector at the start of work on a daily basis. If the Contractor fails to provide daily reports for two (2) or more working days during the scheduled work week, then a Stop Work Notice will be issued and progress payments will not be processed until all paperwork is current.
Contract period will continue to be in force while the Stop Work Notice is in effect.
C. Contractor shall furnish a minimum of eight (8 ) photos with the Daily Report documenting the progress of the Work, equipment in use, safety equipment in use and other relevant features of the Work. Photos shall be submitted electronically as JPEG (.jpeg) or PNG (.png) file types or sufficient quality and legibility.
2000-24 Testing and Inspection
A. Attention is directed to Section 3-5 “Inspection” of the Standard Specifications, Section 9.3 “Inspection”, Section 10.8 “Tests and Inspections”, and Section 10.10 “Compaction Tests” of the General Conditions/Specifications and these Special Provisions.
B. It is the responsibility of the Contractor to facilitate sampling to be used for testing purposes. Costs for failed tests and retesting necessary because of the Contractor’s failure to comply with specification requirements will be borne by the Contractor.
C. Contractor must notify the City 72 hours in advance of commencing construction requiring testing.
2000-25 Designated Person of Contact and Supervision
A. Before starting work, the Contractor shall designate a project superintendent or foreman to be always present on the job, with the authority to receive direction from the inspector and City and be in responsible charge of the worksite. Should multiple crews be utilized, a foreman shall be assigned per crew with the authority to receive direction and provide information requested by the inspector. The representative shall not be replaced without written notice to the City, except under extraordi nary circumstances. In order to communicate with the Agency, the Contractor’s representative, superintendent, or foreman shall be able to speak, read, and write the English language and be available to communicate by cellular telephone during work hours. Lack of supervision shall be grounds for a Stop Work Notice.
2000-26 Responsibility for Job Site Conditions
A. Contractor agrees that, in accordance with generally accepted construction Specification No. WT-5080 Section 2000
Special Provisions Page 16
practices, Contractor will be required to assume sole and complete responsibility for job site conditions during the course of construction of this Project including safety of all persons and property, and that this requirement will apply continuously and will not be limited to normal working hours. Contractor further agrees to defend, indemnify and hold the City and the City’s design and construction observation professionals harmless from all liability and claims, real or alleged, in connection with the performance of work on this Project.
B. The Contractor must make field measurements and verify field conditions and must carefully compare such field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing activities.
Errors, inconsistencies or omissions discovered must be reported to the Engineer immediately by telephone and in writing. When conditions are encountered which, in the opinion of the Engineer, require temporary suspension of work for design modifications or for other determinations to be made, the Contractor must move to other areas of work until such determinations are made at no cost to the Owner. No additional compensation will be allowed by reason of such temporary suspension of a portion of the Work, or modificat ions to work. Appropriate extension of time for completion may be allowed where justified in the opinion of the Engineer. If articles having archeological significance are identified, the Contractor must suspend work to allow evaluation by the Engineer.
C. Provide and install non- skid steel plates at open trench excavations at the end of work day. Plates on arterial streets must be flush with adjacent pavement surface and secured as directed by Engineer in accordance with CALTRANS TR -0157 Method 1. Plates on other streets may be placed on pavement with temporary transitions as directed by Engineer in accordance with CALTRANS TR-0157 Method
2. 2000-27 General Safety Requirements
A. Contractor must do whatever work is necessary for safety and be solely and completely responsible for conditions of the job site, including safety of all persons (including employees) and property during the Contract period. Safety provisions must conform to Federal and State Departments of Labor Occupational Safety and Health Act (OSHA), and other applicable Federal, State, County and local laws, ordinances, codes, requirements set forth herein, and regulations that may be specified in other parts of these Contract Documents. Contractor must do all work necessary to protect the general public from hazards, including, but not limited to, surface irregularities or unramped grade changes in vehicular travel ways (including but not limited to streets, roads and driveways), pedestrian sidewalks or walkways.
Barricades, lanterns, and proper signs must be furnished in sufficient amount to safeguard the public and the work. This requirement applies continuously and is not limited to normal working hours.
B. Contractor must develop and maintain for the duration of the Contract, a safety program that will effectively incorporate and implement required safety provisions.
The Contractor must appoint a qualified employee who is authorized to supervise and enforce compliance with the safety program.
2000-28 Construction Waste Management and R
ecoverable Materials
A. Contractor shall comply with all demolition and waste recycling requirements as described in the General Conditions.
Specification No. WT-5080 Section 2000
Special Provisions Page 17
B. As part of the Demolition Waste Recycle Plan/Statement submittal, Contractor shall describe their plans for management of construction waste materials, including but not limited to the following:
1. Planned disposal locations of construction waste materials, including a. Name, location and contact information for facilities. b. Contractor’s permit or license for use of facilities.
2. Plans for storing construction waste materials to prevent site or environmental pollution, fire hazards, safety hazards to persons and property, and contamination of stored materials.
3. Methods for coverage construction waste materials subject to disintegration, evaporation, odor production, settling, or runoff to prevent polluting Project site, air, water, and soil. Contractor shall comply with the following requirements:
a. C lean all materials of wastewater debris and contaminations prior to placing in waste collection or storage containers.
b. Use debris chutes with covered tops when transferring waste to containers.
c. S tore debris in suitable covered containers located where directed by the City and remove from Project site when full.
d. Provide additional means for storing and transporting clean and uncontaminated debris in accordance with receiving facilities requirements.
e. Burning of debris on the site is not permitted.
4. Safe separation methods for sorting debris types and materials.
C. Contractor shall obtain receipts for all delivery of construction waste to receiving facilities and submit results of construction waste disposal including amount of materials diverted from landfill and materials delivered to landfill.
D. Contractor shall comply with all Local and State codes and regulations for hauling, recycling and disposal of construction waste materials.
E. The Contractor must include in the bid all costs for disposal of all construction materials and waste produced as a result of performing the Work described in these Contract Documents.
F. Recoverable Materials
1. The City refuses right to recoverable materials from this Project. No recoverable materials will be collected or preserved from the construction activities. The Contractor must dispose of all recoverable materials in a proper and legal manner. The Contractor must include in the bid all costs for disposal. The City reserves the right to modify its decisions regarding refusal up to the point in time the materials are removed from the site.
2000-29 Project Appearance and Cleanup
A. The Contractor must keep the site clean, control dust from construction operations, provide sanitation for workers, and control air pollution from construction operations.
Broken concrete and debris developed during demolition, clearing and grubbing Specification No. WT-5080 Section 2000
Special Provisions Page 18
must be disposed of concurrently with its removal. Broken concrete, debris, and construction materials that remain on the job site overnight will be subject to Liquidated Damages for Failure to Perform as specified in these Special Provisions.
B. Weeds, trash and debris must be removed from the work site regularly and when directed by the Engineer. Graffiti must be removed within 24- hours of the graffiti appearing and when directed by the Engineer. All graffiti within the project limits must be removed. Contractor must submit method of removal to the Engineer for approval prior to graffiti abatement. Stickers, paint, and other forms of graffiti must also be removed.
C. Upon completion of the Work and before the final inspection, the Contractor must at the Contractor’s own cost satisfactorily dispose of, or cause to be disposed of, all plant, buildings rubbish, waste products, debris, unused materials, concrete forms, and other equipment used during the construction of the improvements. In the event that the Contractor fails to perform this final cleanup, the City may remove and/or dispose of the articles or materials at the Contractor’s expense.
2000-30 Differing Conditions
A. Contractor may not willfully install work as shown on the drawings when it is obvious in the field that obstructions, grade differences or differences in the area dimensions exist that might not have been considered or observed during design. Contractor must promptly notify the Engineer and the agency having jurisdiction by telephone and in writing upon discovery of, and before disturbing, any physical conditions differing from those represented by approved plans and specifications. In the event this notification is not performed, the Contractor must assume full responsibility for necessary revisions.
2000-31 Changes in Work
Attention is directed to Section 2-6 “Changes Requested by the Contractor,” Section 2- 7 “Changes Initiated by the Agency,” and Section 2-8 “Extra Work” of the Standard Specifications and these Special Provisions.
The City will issue a Contract Change Order (CCO) if a change to the Total Contract Price or Contract Time is necessary. The Contractor will not be entitled to any adjustments in either Contract Time or Total Contract Price for changes performed without written direction from the City. Adjustments in Contract Time or Total Contract Price for changes performed will not be made until a Contract Change Order is approved. The labor rates paid for time and material work will not be higher than the applicable prevailing wage rate for the worker classifications required for the work. The Contractor shall prepare a time impact justification for consideration for any adjustments in Contract Time. The time impact justification accepted by the City will be used to adjust the Contract Time in the CCO.
If the Contractor requests an extension of time as a part of a contract change order, Contractor must provide a revised construction schedule and written justification for the extension of time, at the time of Contractor’s request for the change order. The justification must include an analysis for the time requested, showing how the change affects the critical path/controlling item of work and must be provided to the Engineer in editable electronic format compatible with MS Project, in addition to a legible hardcopy.
The sections that follow replace sections of like number in the Standard Specifications Specification No. WT-5080 Section 2000
Special Provisions Page 19
for Public Works Construction (SSPWC).
7-3.5.2 Increases of More Than 25 Percent. Should the actual quantity of an item of work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications, exceed the Bid quantity by more than 25 percent, payment for the quantity in excess of 125 percent of the Bid quantity will be made on the basis of a decrease in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or in the event mutual agreement cannot be reached, on the basis of Extra Work per 3- 3 or at the Contract Unit Price at the Agency’s option.
The Extra Work per 3 -3, basis of payment, does not include fixed costs. Fixed costs will be deemed to have been recovered by the Contractor through payment for 125% of the Bid quantity at the Contract Unit Price.
7-3.5.3 Decreases of More Than 25 Percent. The City, at its sole discretion, may decrease the quantities of the items of work to be completed under this contract.
In such an event, payment will be made based upon the decrease in quantity at the Contract Unit Price, except for Major Bid Items as described below.
A Major Bid Item is defined as a single Contract item constituting 10% or more of the original Contract Price. In the case of a decrease in a Major Bid Item, the following will apply:
Should the actual quantity of an item of work covered by a Contract Unit Price, and constructed in conformance with the Plans and Specifications, be less than 75 percent of the Bid quantity, an adjustment in payment will not be made unless so requested in writing by the Contractor. If the Contractor so requests, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per 3- 3; however in no case will payment be less than would be made for the actual quantity at the Contract Unit Price nor more than would be made for 75 percent of the Bid quantity at the Contract Unit Price.
2000-32 Extra Work
Subsection 7-4.2.1, Labor rates used for Extra Work shall be at applicable prevailing wage rates plus allowable markups per this section.
Subsection 7-4.3, “Markup” of the Standard Specifications (SSPWC) is deleted in its entirety and replaced by the following:
7-4.3 Markup.
a) Work by Contractor. When extra work is to be paid for on a force account basis, use the CALTRANS Equipment Rental Rate Book for equipment rental rates. The following percentages will be added to the Contractor’s costs and will constitute the markup for all overhead and profits:
i. Labor………………………………….35
ii. Materials……………………………...15
iii. Equipment Rentals…………………..15
Specification No. WT-5080 Section 2000
Special Provisions Page 20
The markup percentages above will reimburse the Contractor for all additional costs, and no other additional payment will be made by reason of performance of the extra work.
b) Work by Subcontractor. When extra work to be paid for on a force account or lump sum basis is performed by a subcontractor, the markup established above in 7- 4.3 (a) “Work by Contractor” will be applied to the subcontractor’s actual cost of such work. An additional markup of ten (10) percent of the subcontracted portion of the extra work may be added by the Contractor. The markup will constitute the markup for a ll overhead and profit for the Contractor on extra work done by the subcontractor, and no other additional payment will be made.
c) Equipment Rental rates will be determined using CALTRANS Labor Surcharge and Equipment Rental Rates in effect at the time the work is performed.
d) The labor rates paid by the City for (time and material) Force Account work will be at the applicable prevailing wage rate for the worker classifications required for the work plus applicable mark-ups described in this section.
2000-34 Claims between Ci
ty and Contractor
A. Attention is directed to Section 12 “Claims between City and Contractor” in the General Conditions-Specifications.
2000-35 Construction As Built Drawings
A. The Contractor must submit the Network Site Plans with visual representation of planned installation efforts, roles and responsibilities by party, and all equipment components and specifications for each network site. These plans must be submitted and authorized by the City prior to the network equipment being ordered and well in advance of any construction work commencing. An example of this document is included in Appendix C.
B. The Contractor must record all changes in construction. Completely, accurately, and legibly mark the job set of as -built drawings in red ink to record actual construction.
Any additional notes or comments on why the changes were made should be included, along with inclusion of any additional equipment specifications and details such as VIN and equipment IDs that further identify the material installed at each specific networ k location.
C. Full compensation for recording construction changes and furnishing the Network Site Plan Drawings, including the updated As-Built versions, is considered included in the prices paid for the various bid items of work and no additional compensation will be allowed.
2000-36 Closeout Procedures
A. Attention is directed to Section 11 “Acceptance of Work” of the General Conditions/Specifications and these Special Provisions.
B. Contractor must submit closeout submittals upon completion of work, including completion of punch list items, and at least seven (7) days prior to application for final payment, including, but not limited to the following:
Specification No. WT-5080 Section 2000
Special Provisions Page 21
1. Evidence of compliance with requirements of governing authorities.
2. Operations and maintenance manuals.
3. Keys, spare parts, remotes and other required devices.
4. Warranties and bonds including an Increase Rider in the amount of final contract.
5. Evidence of payment and release of liens as outlined in conditions of the contract.
6. Release of claims as outlined in conditions of contract.
7. Summary of solid waste disposal and diversion.
8. Certification of final completion.
C. When the work for each bid schedule has been completed, the following steps will be taken:
1. Contractor will submit a notice of completion letter to the engineer including a certificate of compliance in accordance with General Conditions Section 11.7.
2. Engineer will make the final inspection and final project walk -through with the Contractor.
3. If substantial deficiencies are present, the Engineer will create a punch list of deficient items that need to be corrected by the Contractor. The Engineer reserves the right to add items to the project’s punch list as deemed necessary.
4. All punch list items must be completed within 5 working days of notice to Contractor. Punch list items must be accounted for in the project construction schedule within the project working days. The Contractor will not be granted additional working days for the completion of the punch list items.
5. After the punch list items have been successfully corrected the City will acknowledge completion of the work for that bid schedule . This will start the warranty period for that bid schedule.
2000-38 Payment
A. Full compensation for work, other features, and conforming to the requirements of this Section 2000, “General “, is considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed.
B. Work called for on the plans or required by the specifications, but for which no bid item exists is considered included in the prices paid for the various items of work and no separate payment will be made.
END OF SECT
ION
Specification No. WT-5080 Section 2001
Special Provisions Page 1
SECTION 200 1 – MOBILIZATION
2001-01 General Requirements
Mobilization work will include all mobilization, remobilization as needed, demobilization, bonds, and insurance, preparatory and operations work necessary to provide for bonds, insurance, required permits and fees, submittals, shop drawings, project phasing, multiple move -ins and move- outs required to prosecute the work, supervision, coordination and concurrent work with other contractors, meetings, preparing “as -built” plans or record drawings, movement of personnel, equipment, supplies, and incidentals to and from the project site; the establishment of all other facilities necessary for work on the project; for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items of work at the project site; and work and improvements called for or implied by the Contract Documents, which are not included in the other bid items but are required to complete the Work.
The City will not pay for remobilization in the instance that the Contractor and crew have to demobilize for lack of equipment or other similar scenario of which the City has no control over. Re-Mobilization Bid Items 28 and 50 will only be paid in the instance the c ontractor has to fully demobilize and remobilize due to finishing work prior to the starting dates of Additive Alternate Bid 1 and 2. Continuous work not necessitating re-mobilization will not be considered for payment.
2001-02 Measurement and Payment
Refer to Section 2005.
END OF SECT ION
Specification No. WT-5080 Section 2002
Special Provisions Page 1
SECTION 200 2 – TRAFFIC CONTROL, PARKING RESTRICTIONS AND SIGNAGE
A. Construction signage shall be provided by Contractor as directed by the Engineer to ensure safety and convenience for staff and vendors onsite at the plant at no additional cost to the City.
B. Personal vehicles of the Contractor’s employees may not be parked on the traveled way. Employees’ personal vehicles may be parked at locations designated or approved by the City and the Engineer.
C. Contractor shall receive City approval prior to blocking an access route. Contractor shall provide proper signage to notify vehicles of the access route obstruction and allow for a detour.
D. The Contractor is to be fully responsible for maintaining all traffic control and/or signage during the construction period and must furnish all traffic control equipment, signs, and barricades necessary to meet the requirements of these specifications, the direction of the Engineer, and required to complete the project.
E. Upon completion of the work in an area requiring traffic control, all components of the traffic control system must be removed from the site of the work.
END OF SECT
ION
Specification No. WT-5080 Section 2003
Special Provisions Page 1
SECTION 2003 – STORMWATER POLLUTION CONTROL PROGRAM
2003-1 General
A. The Contractor shall prepare and maintain a Stormwater Pollution Control Plan (SWPCP) on the form provided by the City, included in Appendix H of the Contract Documents, which describes in specific detail the Contractor’s program to prevent contamination of the stormwater collection system. Contractor shall implement, maintain, inspect and remove all erosion and sediment controls identified in the SWPCP. The program shall address both common construction activities and extraordinary events.
B. Contractor shall include water pollution control drawings (WPCD) in the SWPCP to illustrate the locations, applications and deployment of best management practices (BMPs) identified in the SWPCP. The WPCDs shall be included as an attachment to the SWPCP. Sample WPCDs can be obtained from the Caltrans Storm Water Quality Handbook. The SWPCP shall also comply with the Ventura County Municipal Separate Storm Sewer System Permit (Order No. 2010-0108). A copy of the permit is available for review from the Ci ty of Camarillo Stormwater Program Manager; phone 805-383-5659.
C. The Contractor shall comply with laws, rules, and regulations of the State of California and agencies of the United States Government prohibiting the pollution of lakes, wetlands, streams, or river waters from the dumping of contaminates, refuse, rubbish or debris.
D. The Contractor s
hall submit three (3) copies of the SWPCP a minimum of 10 working days prior to beginning construction. Construction shall not begin until the SWPCP is approved. Contractor shall update the SWPCP as necessary during the work to prevent contamination of the stormwater collection system. At completion of construction, contractor shall provide City with site copy of the SWPCP, including all required inspection and training reports.
E. Bef
ore start of work, Contractor shall train all employees and subcontractors on the SWPCP and related WPCD and provide City with written documentation of said training.
F. Suggested BMPs can be obtained from the following sources:
1. Ventura County Municipal Separate Storm Sewer System Permit/Order 2010- 0108 available at Los Angeles Regional Water Quality Control Board web site at
http://www.swrcb.ca.gov/rwqcb4/water_issues/programs/stormwater/municipal /index.shtml
2. California Stormwater BMP Handbooks for Construction or Municipal Activities www.cabmphandbooks.com
3. Ventura Countywide Stormwater Quality Management Program www.vcstormwater.org.
4. Caltrans’ Stormwater Quality Handbooks
http://www.dot.ca.gov/hq/construc/stormwater/stormwater1.htm
Specification No. WT-5080 Section 2003
Special Provisions Page 2
2003-2 Construction
A. The Contractor shall keep a copy of the SWPCP on the job site. The Contractor shall provide continuously at the jobsite all of the tools, equipment, and materials necessary to implement the SWPCP at all times from project initiation through completion, including any punchlist or warranty work on the project.
B. At a minimum the following requirements should be met as applicable, to the maximum extent practicable, at construction sites regardless of size:
1. Storm Drain System Protection – At the first order of work, the Contractor shall protect the existing storm drain system from entrance of construction debris and pollutants. Such protection shall include implementing the BMPs as outlined in the SWPCP. Protection shall prohibit the discharge of untreated runoff from temporary or permanent street maintenance/landscape maintenance material and waste storage areas from entering the storm drain system. Sediment that is generated on the project site shall be retained using structural drainage controls.
In addition, the protection system shall have a minimum of three features: 1) a particulate filter of geosynthetic material securely fastened in place such that it cannot be bypassed without significant physical damage; 2) a prefilter for the particulate filter; and 3) on-hand materials to close off the inlet or opening in the case of a significant pollution spill. Contractor shall monitor and maintain all storm drain inlet protection devices during rain events to prevent flooding.
2. Material Management & Storage – No construction-related materials, wastes, spills or residues shall be discharged from the project site to streets, drainage facilities or adjacent properties by wind or runoff. All materials and/or equipment storage areas where liquid construction materials are placed shall be protected by a physical barrier capable of containing the entire volume of stored liquid materials. During active construction activities, portions of the barrier may be removed for access. However, the barrier materials must be readily accessible for replacement by onsite construction personnel. The barrier must be in place at all times during the absence of Contractor personnel at the storage site.
Building materials should be placed on pallets and covered in event of rain. Do not store materials in the street or gutter area.
3. Equipment & Vehicle Maintenance – Non-stormwater runoff from equipment and vehicle washing and any other activity shall be contained at the project site and shall not be allowed to discharge from the project site to streets, drainage facilities or adjacent properties by wind or runoff. The Contractor shall inspect vehicles and equipment on each day of use. Leaks shall be repaired off -site if possible. If necessary to repair on site, the runoff must be contained or the problem vehicle or equipment shall be removed from the project site until repaired. If necessary, drip pans should be placed under the vehicles or equipment while not in use to catch and/or contain drips and leaks.
4. Soil Erosion Control – Erosion from slopes and channels will be significantly reduced by implementing BMPs, including but not limited to, minimizing grading activities during the wet season, inspecting graded areas during rain events, planting and maintaining vegetation on slopes or other erosion controls such as Specification No. WT-5080 Section 2003
Special Provisions Page 3
hydraulic mulch, hydroseeding, soil binders, and straw mulch, or covering slopes susceptible to erosion with geotextiles and mats.
5. Spill Prevention & Cleanup Plan - Contractor shall have a spill prevention plan and spill cleanup materials readily available and addressed in the SWPCP.
Spills shall be cleaned up immediately using dry methods if possible. Spill cleanup material shall be properly disposed of. Refer to SC-11 Spill Prevention BMP from the California Stormwater BMP Handbook for Municipal Activities .
Contractor shall keep a record of any spills in the inspection log. In addition, at the end of the project, the Contractor must certify that all contaminated materials have been properly disposed in accordance with the SWPCP.
6. Asphal
t & Concrete & Related Activities – Contractor shall implement the following BMPs:
1. Restrict paving/repaving activity to exclude periods of rainfall or predicted rainfall unless required by emergency conditions.
2. Install sand bags or gravel bags and filter fabric at all susceptible storm drain inlets and at manholes to prevent spills of paving products and tack coat.
3. Prevent the discharge of release agents including soybean oil, other oils, or diesel to the storm drain system or receiving waters.
4. Minimize non- stormwater runoff from water use for the roller and for evaporative cooling of the asphalt.
5. Clean equipment over absorbent pads, drip pans, plastic sheeting or other material to capture all spillage and dispose of properly.
6. Collect liquid waste in a container, with a secure lid, for transport to a maintenance facility to be reused, recycled or disposed of properly.
7. Collect solid waste by vacuuming or sweeping and securing in an appropriate container for transport to a maintenance facility to be reused, recycled, or disposed of properly.
8. Cover the cold mix, asphalt, materials (i.e., pre-mixed aggregate and asphalt binder) with protective sheeting during a rainstorm.
9. Cover loads with tarp before haul -off to a storage site, and do not overload trucks.
10. Minimized airborne dust by using water spray during grinding
11. Avoid stockpiling soil, sand, sediment, asphalt material and asphalt grinding material or rubble in or near storm water drainage systems or receiving waters.
12. Protect stockpiles with a cover or sediment barriers during a rain event.
7. Sidewalk Washing – The following methods should be utilized to prevent discharge of sidewalk cleaning wastewater into the storm drain system:
1. Sweep and pick up all areas to be cleaned before using water.
2. Manually scrape gum from sidewalks and other surfaces.
Specification No. WT-5080 Section 2003
Special Provisions Page 4
3. Must use high pressure and low volume of water with no additives and at an average usage of 0.006 gallons per square foot of surface area to be rinsed.
4. Use a wet/dry vacuum to collect wash water for disposal. Large volumes of wash water may require the use of a small sump pump to remove wash water from the job site.
5. One or more of the following methods are recommended to prevent pollutants from entering the storm drain system:
• Sandbags can be used to create a barrier around storm drains. * • Rubber mats or plugs can be used to seal drain openings. * • Temporary berms or containment pads help keep water on site. * • Use berms of sandbags to direct wash water to landscaping. * • Use large squeegees to accumulate sheet flow for collection. *Remember to remove plugs, berms, and sandbags or you may be liable for possible flooding.
Wash water that may contain hazardous waste such as oil-saturated absorbents, water with lead or other heavy metals from oxidized paint, and solvent cleaners requires special treatment and must be disposed of through a hazardous waste facility.
8. Employee BMP Training – Contractor shall train employees and subcontractors on BMP implementation, general good housekeeping, and proper spill containment and cleanup. Before start of work, Contractor shall provide City with written documentation of training and keep all documentation in the SWPCP.
9. Inspection – The Contractor shall inspect all pollution control BMPs per schedule below. Contractor shall forward electronic copies of inspection reports to City Stormwater Program Manager by the end of the week that inspection took place. The Contractor should also repair/replace any damaged BMP or clogged element on a daily basis. The Contractor shall keep a monitoring inspection log of each inspection in the SWPCP. Minimum inspection frequency:
1. Once per month during the non-rainy season (April 16 – September 30)
2. Once per week during the rainy season (Oct. 1 – April 15)
3. Before, during and after a major rain event, the area shall be inspected at a minimum twice per day, seven days per week, whether or not any work has been performed. The daily checks shall be between 6 and 9 am and 4 and 8 pm.
10. Removal of Accumulated Rainwater – The Contractor shall follow the City of Camarillo Guidelines for Removal of Rainwater that has accumulated on the job site. The preferred method is to filter the rainwater into a water truck for use in dust control or irrigation. If it is necessary to remove rainwater from the site to the street, gutter or storm drainage system, Contractor shall use BMPs to insure that the water does not exceed 100 mg/l of Total Suspended Solids and no other construction waste is present in the water to be discharged before discharging to drainage facilities.
Specification No. WT-5080 Section 2003
Special Provisions Page 5
2003-3 Payment
Refer to Section 2005.
END OF SECTION
Specification No. WT-5080 Section 2004
Special Provisions Page 1
SECTION 200 4 – MEASUREMENT AND PAYMENT
2004-1 G enera l
A. Measurement will be in accordance with Standard Specification unless otherwise specified.
Bid Item List Abbreviations
Abbreviation Meaning
CF cubic foot
CY cubic yard
EA each
(F) final pay item
GAL gallon
HR hour
LB pound
LF linear foot
LS lump sum
SF square foot
SY square yard
TN 2,000 pounds
B. When an item of work is designated as (F) in the bid schedule, then the item shall be a final pay item for payment purposes only. For a final pay item, payment shall be based on the quantity shown in the bid schedule for that item, regardless of the actual quantity used, unless the item quantity is changed by the Engineer.
2004-2 Payment
A. Payment
a. Payment for the various items of the Bid S chedule, as further specified herein, shall include all compensation to be received by the Contractor for furnishing all tools, equipment, supplies, and manufactured articles, and for all labor, operations, and incidentals appurtenant to the items of work being described, as necessary to complete the various items of work as specified and shown in the Contract Documents, including all appurtenances thereto complete and in place, and including all costs of compliance with the regulations of public agencies having jurisdiction.
B. Partial payments
a. Partial payments will be made for uninstalled materials and equipment on an exception basis only, based on prior written approval from the District. Upon approval, payments will be made only for materials delivered and stored on site and will be paid based on the actual invoiced amounts, without Contractor markup.
END OF SECTION
Specification No. WT-5080 Section 2005
Special Provisions Page 1
SECTION 200 5 – COMPENSATION
2005-1 Base and Alternate Bid Items
A. Refer to Bid Schedule for description of basis of award.
B. Bid Item No. 1, 28 , and 50 – Mobilization/Demobilization
a. Specification References: S pecial Provisions Section 2001
b. Measurement and Payment:
i. Measurement and payment for Bid Item No. 1 Mobilization shall be made at the contracted Lump Sum price. The price shall be considered full compensation for the furnishing of all materials and for all labor, equipment, tools, and all incidentals necessary to complete all aspects of the work.
ii. A 25% payment of the lump sum total will be paid with the first progress payment of the bid schedule and the remaining 75% will be paid incrementally over the life of the Bid Schedule where these subsequent payments will be based on the percentage of the Bid Schedule Contract Time completed to date.
C. Bid Item No. 2
– Stormwater Pollution Control Program
a. Specification References: S pecial Provisions Section 2003
b. Measurement and Payment:
i. The Contractor shall be paid for work of preparing, implementing, inspecting, maintaining, and removing the Stormwater Pollution Control Program under the contracted Lump Sum price basis enumerated in the Bid Schedule for the Stormwater Pollution Control Program. In addition, failure to perform and document daily inspections shall result in a daily penalty of $250/calendar day. The imposition of penalties shall not relieve the contractor of any obligations of these project requirements.
ii. Payment for the work involved for Bid Item No. 2 for the Stormwater Pollution Control Program may be made on a partial payment system based on completion of the following stages of work:
Work Description Pay ment
Develop Plan 10% of Bid Price
Initial Plan Implementation 10% of Bid Price
Removal of BMPs at Completion 10% of Bid Price
Inspection & Maintenance of SWPCP 70% of Bid Price
iii. Payment for the Stormwater Pollution Control Program shall include all the labor, materials, equipment, and incidentals for preparing, maintaining and updating a Storm water Pollution Control Program and complying with all Specification No. WT-5080 Section 2005
Special Provisions Page 2
provisions including maintenance and updating of Best Management Practices (BMP's) throughout construction, as specified herein.
iv. Fines and penalties from regulatory agencies levied against the District as a result of the Contractor's work, including action or inactions shall be the responsibility of the Contractor and may be deducted from payments due or to become due to the Contractor.
D. Bid Item No. 3 – AMI Network Devices
a. Specification References: S pecification Sections 01 73 19, 01 79 00, 01 93 10, 33 09 09, 33 09 11, 40 91 16, 40 91 17, 40 97 50.
b. Meas urement and Payment : Measurement of payment for contract will be made as a lump sum for the purchasing and installation of AMI network devices and software.
Payment will be made as a lump sum for conducting a network propagation st
udy and for appurtenant devices and software for the AMI network system, which price shall include furnishing materials, labor, equipment, and construction of AMI network system not separately itemized as bid items.
Appurtenant items include the following:
1. AMI Network and Gateway Supplies
2. AMI Network Installation
3. Setup and Deployment of Field Management Software
4. Meters and Transmitters and related appurtenances
5. RF-Friendly Lids and Replacement Meter Boxes
6. Head End Applications/Software
7. Meter Data Management System/Software
8. AMI Endpoint Programming Handheld
9. Training (Software, Installation, Troubleshooting, Network)
10. Software Interfacing
11. Ancillary Equipment (Pipe, Large Meter Appurtenances, etc.)
E. Bid Item No. 4 – AMI Software
a. Specification References: S pecification Sections 01 73 19, 01 79 00, 01 93 10, 33 09 09, 33 09 11, 40 91 16, 40 91 17, 40 97 50.
Specification No. WT-5080 Section 2005
Special Provisions Page 3
b. Measurement and Payment: M easurement of payment for contract will be made as a lump sum for the purchasing and installation of AMI network devices and software.
Payment will be made as a lump sum for implementing the AMI software and int
egrating with the City’s CIS, CentralSquare. Interfaces should automate the meter inventory entry into CentralSquare, mass meter change- out, data sync between CIS and MDM, and a reading interface to provide reads from the MDM to CIS for billing. The Vendor will be expected to participate in a Systems Sub- Team that will be responsible for the creation of the interface requirements, and for the subsequent development and testing of all interface files. The installer will be required to provide a work order management system and automate the capture of all meter exchanges. Pricing for this shall be provided for the Setup and Deployment of Field Management Software. Appurtenant items include the following:
1. Setup and Deployment of Field Management Software
2. Head End Applications/Software
3. Meter Data Management System/Software
4. AMI Endpoint Programming Handheld
5. Training (Software, Installation, Troubleshooting, Network)
6. Software Interfacing
F. Bid Items
No. 5 through 6, 29 through 31, and 51 through 54 – Meter Installation
a. Specification References: S pecification Sections 01 73 19 and 40 91 15
b. Measurement and Payment: M easurement for payment will be made as for each meter installed at the specified size and location shown in Attachment A.
Pay
ment will be made at unit price per bid upon completion of meter installation, which price shall include all costs for materials, labor, equipment, incidentals, and construction of meter installation and appurtenances associated with the meter installation as specified. Includes:
1. Set up and test meter swap file and field installation software for proper tracking of field data and installation procedures
2. Prepare meter box lids for proper RF transmission
3. Ensure no water is being used at location prior to commencing meter replacement. Validate valve position before commencing meter replacement. Valve should be put back in same position after installation is complete.
Specification No. WT-5080 Section 2005
Special Provisions Page 4
4. Commission the meter/transmitter and ensure all configurations were properly setup
5. Confirm installation was correctly performed by validating successful connectivity to the network
6. Complete all site data capture including photos, asset information and special notations in data handheld for electronic transfer to utility
7. Properly manage and track any return to utility (RTU) or skip accounts
8. Manage scrap and project waste, including but not limited to meters, transmitters and meter box covers, for environmental compliance and aligned with City. Condition of meter box and surrounding area should be left in same or better condition as it was prior to meter replacement work.
G. Bid Item No. 7 – Meter Retrofit Installation
a. Specification References: S pecification Sections 01 73 19 and 40 91 15
b. Measurement and Payment: M easurement for payment will be made as for each meter retrofitted at the specified locations shown in Attachment A.
1. Set up and test meter swap file and field installation software for proper tracking of field dat
a and installation procedures
2. Retrofit accounts will be designated separately from accounts where full meter replacement will be required. Work order should indicate account is retrofit
3. Prepare meter box lids for proper RF transmission
4. Commission the meter/transmitter and ensure all configurations were properly setup
5. C onfirm installation was correctly performed by validating successful connectivity to the network
6. Complete all site data capture including photos, asset information and special notations in data handheld for electronic transfer to utility
7. Properly manage and track any return to utility (RTU) or skip accounts
8. Manage scrap and project waste, including but not limited to meters, transmitters and meter box covers, for environmental compliance and aligned with City
Payment will be made at unit price per bid upon completion of meter retrofit, which price shall include all costs for materials, labor, equipment, programming, testing, incidentals, removals and hauling of waste, and construction of meter retrofit and appurtenances associated with the meter retrofit as specified.
H. Bid Items
No. 8 through 14 – Stock Meter
a. Specification References: S pecification Sections 01 73 19 and 40 91 15
b. Measurement and Payment: M easurement for payment will be made for meters delivered and unloaded at the City of Camarillo Corporation Yard located at 283 Glenn Drive Camarillo, CA 93011. City to confirm number and sizes of meters prior to the contractor ordering.
Specification No. WT-5080 Section 2005
Special Provisions Page 5
2005-2 Non-S tandard Installation Bid Items
A. Bid Item Nos. 1 5 through 27, 32 through 48, and 55 through 63 – Non-Standard Installations
a. Specification References: Specification Sections 01 73 19 and 40 91 15. i. Note that meter box lid sizes are listed in 01 73 19_2.01_2. b. Measurement and Payment: No n-Standard Installations will be identified by the City. No payment will be made for any of these line items without prior authorization from the City. Measurement for payment will be made based on scope of each Non-Standard Installation authorized by the City. The exception of the pre-authorization is the meter box lids . A ll lids will be replaced which are not already AMI compatible.
Payment will be made at unit price per bid upon completion of Non-St andard
Installation, which price shall include all costs for materials, labor, equipment, programming, testing, incidentals, removals and hauling of waste, and construction of meter retrofit and appurtenances associated with the Non- Standard Installation as specified.
B. Bid Item No. 49 and 64 – Hourly Rate for On-Call Services a. Specification References: Specification Sections 01 73 19 and 40 91 15. b. Measurement and Payment: Hourly Rate for On-Call services are for special situations such as large meter replacement not covered under other line items.
Those situations requiring on-call service will be identified by the City. No payment will be made for this line item without prior authorization from the City.
Materials and material costs required for Non -Standard Installations not covered under other line items must be authorized by the City prior to installation. Measurement for payment will be made based on scope of each Non-Standard Installation authorized by the City.
END OF SECTION
Specification No. WT-5080 Section 2006
Special Provisions Page 1
SECTION 2006 – CONCRETE IMPROVEMENTS
2006-1 General
A. This section pertains to street concre te improvements including sidewalks, access ramps, curbs, curb and gutter, driveways, spandrels and cross gutters. Contractor shall include the cost of demolition and root pruning as well as site preparation and associated asphalt pavement conform placement in the bid.
B. Pedestrian access must be maintained at all times to all business, residences and buildings adjacent to Construction. The Contractor must, at minimum, provide pedestrian access on one side of the roadway and or one side for crossing roadway at locations determined by the Engineer. All pedestrian access shall have proper advance warnings and detours. Pedestrian access shall be included in the Traffic Control Plan and approved by the Engineer. Under no circumstances may pedestrian access be restricted on both sides of a street simultaneously.
2006-2 Concrete Improvements
A. Concrete improvements shall be constructed with materials as called for in Section 201 – Concrete, Mortar and Related Materials of the SSPWC. The materials and proportioning shall be as called for in Table 201-1.1.2(A) for specific improvements.
All concrete improvements shall be properly cured. Improvements shall be constructed in accordance with the Standard Plans for Public Works Construction, 2012 edition.
B. Concrete improvements adjacent to pavement repairs shall be constructed prior to pavement repairs. Pavement repair may be sawcut at the same time as concrete removal but only enough AC pavement shall be removed for formwork. Pavement repairs shall not be constructed until concrete improvement has cured.
C. Aggregate base shall conform to the requirements of Sections 200-2.2 Crushed Aggregate Base or 200-2.5 Processed Miscellaneous Base of the Standard Specifications and these Special Provisions. Recycled processed miscellaneous base will be acceptable at locations where the base is covered with a finish material.
Aggregate base exposed to view shall be crushed rock only.
D. Utilities, signs, lights and other items located in the parkway shall be located as called for on the plans and in accordance with Standard Plan 101-2. In case of conflict the Engineer shall make the final determination.
E. Tie out existing survey monuments prior to demolition. Re-establish and record survey monuments after construction of concrete improvements.
F. Driveways shall be constructed in accordance with Standard Plan 110-2.
G. Sidewalks shall be a minimum of 4” thick and constructed with a maximum 2% cross slope unless specific grades on the plans call for otherwise. Curb and Sidewalk Joints shall be constructed in accordance with Standard Plan 112-2.
H. Concrete pavement shall be a minimum of 6” thick and constructed in accordance with Standard Plan 132-3.
Specification No. WT-5080 Section 2006
Special Provisions Page 2
I. Curb and Gutter shall be constructed in accordance with Standard Plan 120-2. Curb and Sidewalk Joints shall be constructed in accordance with Standard Plan 112-2.
J. Mountable Curb and Gutter shall be constructed in accordance with Standard Plan 121-2.
K. Existing curb drains shall be replaced and constructed in accordance Standard Plan 150-3.
L. Spandrels and Cross Gutters shall be constructed in accordance with Standard Plan 122-2. Contractor should note the increased cross gutter width on Standard Plan 122-2 for street slopes greater than 4%.
M. Alley Intersection shall be constructed in accordance with Standard Plan 130-2.
N. Concrete Bus Pad shall be constructed in accordance with Standard Plan 120-2.
O. All tree roots encountered during demolition of existing concrete Curb and Gutter, Cross Gutters, Spandrels, Driveways and Sidewalks shall be completely removed to the limits approved by the Engineer prior to construction of new concrete improvements. The Contractor shall coordinate with a City provided Certified Arborist to oversee tree root removal work as determined necessary by the Engineer.
Tree roots that interfere with construction shall be cut off in a workmanlike manner.
All tree roots larger than 3 inches that are within the work area shall be removed in the presence of a Certified Arborist and shall be subject to the approval of the Engineer. Upon approval by Certified Arborist the Contractor shall remove all interfering tree roots and vegetative matter from the excavation and expose the subgrade. Chainsaw or root pruner will be the only acceptable method of removing roots.
P. Root barrier shall be installed where concrete improvements are adjacent to trees.
Root barrier material shall be placed 12 inches deep on the sidewalk side and 18 inches deep on the curb and gutter side and installed per manufacturer’s instructions or as approved by the Engineer. Root barrier shall be seamless and flexible. Root barrier material shall be installed per the manufacturer’s requirements at the back of curbs and sidewalk prior to backfill placement. Root barrier shall be installed flush to the edge of concrete and installed 1-inch below top of sidewalk or top of curb.
Proposed root barrier products must be able to withstand being folded in half and stepped on without cracking.
Q. Irrigation systems, landscape and other improvements damaged during the installation of concrete improvements shall be repaired immediately.
R. This work shall be coordinated with survey monuments being added or reestablished with the project
END OF SECTION
Specification No. WT-5080 Section 01 42 10
Special Provisions Page 1
SECTION 01 42 10 - ACRONYMS
ACCRONYM/TERM DESCRIPTION
AMI Advanced Metering Infrastructure
Backhaul Communications device/connection that facilitates the transfer of data from the AMI collector to the AMI head-end
City City of Camarillo
CIS Customer Information System
Collector Device that receives the data transm itted via RF from the AMI endpoint or repeater. May be used interchangeably with the following: DCU (Data Collection Unit), Gateway, BaseStation, Router
Contractor Refers to the bidder that is awarded the contract CSR Customer Service Representative
DMA District Metering Area
EULA End User License Agreement
GIS Geographic Information System
Head-end Accepts data from AMI collector s via backhaul communications; processes raw data
HES Headend System
IP Internet Protocol
LAN Local Area Network
MAY Indicates an option or permission but is not a mandatory requirement MDMS Meter Data Management System
Nonstandard
Install
Meter installation that involves additional labor and materials, other than replacement of gaskets, or includes alterations to the meter box or lid NRWL Non-Revenue Water Loss
OTA Over the Air
Parties Refers to Contractor and City collectively
QA/QC Quality Assurance/Quality Control
Repeater Device that relays data transmitted via RF from the AMI endpoint to a collector
Responder Responding firm or company to the Request for Proposal RF Radio Frequency
RFP Request for Proposal
RMA Return Merchandise Authorization
ROI Return on Investment
RTU Return to Utility
SCADA Supervisory Control and Data Acquisition
Shall/Must A mandatory requirement; failure to meet these requirements may result in deduction of points or rejection of a proposal
Should A preference or recommendation but is not a mandatory requirement Specification No. WT-5080 Section 01 42 10
Special Provisions Page 2
ACCRONYM/TERM DESCRIPTION
SLA Service Level Agreement
SOP Standard Operating Procedures
SOW Scope of Work
SSO Single Sign-On
Standard Install Replacement of the same size meter, within the same lay length, without any adjustments to piping other than the replacement of gaskets. This also includes no changes to the meter box or lid. Installation is not considered complete until the me ter is commissioned and actively working on the fixed network.
Transmitter Device that sends data from the meter to a collector or repeater. May be used interchangeably with the term "radio", "MIU", or "endpoint" Two-way
transmission
The ability of the transmitter to receive a command from the HES and provide a response in near real-time
Vendor Responding firm or company to the RFP who is selected for the project VEE Validation, Estimation, and Editing
VPN Virtual Private Network
WAN Wide Area Network
END OF SECTION
Specification No. WT-5080 Section 01 73 19
Special Provisions Page 1
SECTION 01 73 19 - GENERAL INSTALLATION AND NON-STANDARD INSTALLATION
REQUIREMENTS
1.01 General Installation Requirements
1. The work to be performed and considered “general”, “standard,” or “like-for-like” includes but is not limited to:
a. Furnishing all labor, materials, tools, and equipment necessary to retrofit or replace certain meters within the City’s service territory; b. Mobilization and demobilization, including ensuring all installers have appropriate PPE (safety vests, steel toe boots, etc.), identification, vehicle magnets/decals, door hangers and printed AMI information (to be developed by City and City’s AMI consultant);
c. S uccessfully completed proper training for work assigned, with additional specifications detailed in section 01 79 00 Training;
d. All work shall be coordinated with project plans, project schedule, contract period, submittals, Stormwater Pollution Control Plan, and all other requirements of these Contract Documents.
e. Contractor will be expected to place door hangers (both versions of the door hanger – pending install notice and notice of completion - to be developed in coordination with the selected Contractor, the City, and the City’s Project Manager and printed by the City) both in advance of the installation work commencing in a certain route/area of the City (specific schedule to be determined between the City and selected Contractor but for planning purposes can be assumed to be 4-12 days in advance of install) and upon completion of the installation.
f. Assignment of work orders for meters to be replaced and/or retrofitted and appropriate equipment to complete the work as assigned
g. Evaluation, upon arrival at account for work to be performed, of whether the installation will be standard, as based on the conditions described in Section
2.01, some of which are subject to change at the City’s discretion, but for planning purposes can be assumed to be as listed below, or non-standard, as listed in Section 2.01, which are also subject to change at City’s discretion. h. Standard replacement of the current analog-read meters with AMI compatible water meters at designated locations where the current meter is older than 3 years is expected to follow the below process:
i. Where replacing a meter includes confirming at correct account, removing dirt and silt from the meter box (expected to not require greater than 30 minutes of digging), turning off water via curb stop or valve, taking picture of existing analog meter in setting, recording final read on meter, removing current analog meter, replacing the existing gaskets, installing the new AMI compatible meter, capturing a picture of the new meter, recording all relevant information in the digital work order (specific fields and pictures required to be decided with City project team), and capture GPS location. Table of sample work order included in section 5.01 Digital Work Order Sample and additional details on established protocol and situational responses detailed in section
4.01:
Specification No. WT-5080 Section 01 73 19
Special Provisions Page 2
ii. Ensure the meter fits properly in the box, with the ability to have the register be visually read.
iii. Validating the transmitter and meter are properly connected, commissioned, and reporting on the network.
iv. Ensuring the meter box lid fits properly in box without contact with the meter or other equipment; if it is unable to seat properly and new meter has already been installed, make note in the work order of the condition . v. Installer will not be required to repair or replace pipe due to corrosion, existing, damage, plumbing irregularities, substandard conditions or existing connections not in conformity to current building codes; however, any instances of these should be documented in the work order and provided to City.
vi. Standard meter exchanges are “like-for-like”, same lay length with no changes to the meter setter or connection other than replacement of gaskets. vii. If standard meter replacement can be completed but there is found to be no appropriate lid replacement, installer should complete the installation and make note of the lid needed, including specific sizing for ordering. Additional details describing the lid issues and required resolution, including supporting pictures, should be provided by the installer and captured in the work order.
2. Standard retrofit of existing meters installed after December 31, 2020, include the following:
a. Confirming at correct account, taking picture of existing analog meter in setting, recording final read on meter, connection of transmitter and/or replacement of meter register as needed, replacement of meter lid as needed.
Work order should capture all equipment, including lid type and size and any ancillary equipment used, for proper inventory tracking and invoicing.
2.01 Non-Standard Water Meter Replacement
1. For meters that do not meet the standard, “like-for-like” installation, common scenarios that would be considered non-standard includes:
a. Tree roots covering meter box and/or meter thereby restricting access to or inability to replace meter
b. Meter box is obstructed by customer decoration, improvements, temporary placements, or landscape by which removal would create potential conflict with customer
i. Trees and shrubs
ii. Retaining walls or other fixed structures
iii. Temporary placements such as seasonal displays or temporary structures
iv. Vehicles
c. Meter box in sidewalk, requires concrete/asphalt work (removal and replacement) to complete meter exchange
i. Sidewalk removal and replacement
ii. Curb and gutter removal and replacement
d. Meter box is damaged and needs replacement
e. Meter lid does not sit flush in meter box, rests on meter register lid cap, or otherwise appears to improperly fit or seat, creating a potential hazard Specification No. WT-5080 Section 01 73 19
Special Provisions Page 3
f. Water leaks identified inside or outside of the meter box ahead of any work by installer
For all non-standard water meter replacements, installer should utilize work order to capture information on what, if any, additional work is needed by City or installer to complete installation.
2. Meter Box and Lid Materials
a. Meter boxes and lids required to be replaced, shall be replaced with the nearest size and shall be DFW or equal, except for the 68 size vault, which shall be Armorcast or equal. The following is a table of the common sizes and corresponding model numbers in the City.
City
Designator
Replacement Meter Box Replacement Lid
3 DFW481C4-12-BODY DFW481C-AF4F SMALL NHK-LID
33 DFW486RF-12-BODY DFW486RF- AF4F SMALL NHK-LID
36 DFW36C4-12-BODY DFW36C- AF4F SMALL NHK-LID
37 DFW486WBC4-12-BODY DFW486- AF4F SMALL NHK-LID
38 DFW1324C4-12-BODY DFW1324C- AF4F SMALL NHK-LID
65 DFW65C4-14-BODY DFW65C- AF4F SMALL NHK-LID
66 DFWPW6C4-12-BODY DFWPW6C- AF4F SMALL NHK-LID
67* DFWB40C4-14-BODY DFWB40C- AF4F SMALL NHK-LID
68** A6001430PCX18 A6001470-H
*Indicates a portion of the meters have lids with 2 ports **Armorcast
3.01 Pre-Installation Requirements
The following section lays out general expectations that are subject to final negotiations and adjustment by the City.
1. Export data from CIS
a. Critical fields to include are Account Number, Customer Number, Customer Name, Service Address, Old Serial Number, Register Number, Meter Size, Meter Type, Meter Manufacturer, Installation Date, Current Read, Previous Read, Current Read Date, Previous Read Date, Route, Sequence, Unique Record Field/Index ID
2. Perform User Acceptance Testing (UAT) testing of Export file data a. Validate data for the following scenarios
i. 10 service locations that have more than one meter at service location (domestic and irrigation)
ii. 10 active accounts and 10 inactive accounts
iii. 10 active meters and 10 inactive meters
iv. 10 meters of each meter type
3. Define DNI (do not install) criteria
a. Identify meters that will not be installed based on DNI criteria; City to validate and sign off on
Specification No. WT-5080 Section 01 73 19
Special Provisions Page 4
b. Establish process for DNI conversions to include responsible party for installation, inventory process, and financial implications for equipment and labor costs
4. Build meter data records into Vendor database for work order
5. Establish process for tracking and installation of New Taps to include responsible party for installation, inventory process, and financial implications for equipment and labor costs
6. Vendor to provide inventory spreadsheet of meter serial numbers and transmitter numbers shipped to City; City to upload prior to install
7. Vendor to load meter/register/transmitter inventory into the installation app
8. Pre-installation customer notification and lid size/type verification a. Pre-notification postcards to be sent to customers in advance of install b. Pre-notification door hangers to be placed by installer in advance of install c. Installers to verify City’s lid audit data of meter box lid count by route and conduct lid type verification when onsite for pre-install door hanger placement d. Discrepancies in lid type found in routes should be shared with project team for inventory reconciling and proper install planning for each route
9. All work orders to be properly designated as Pending or Skip/DNI
4.01 Established Protocol and Situational Responses – Water Meter Replacement The following section lays out expectations by the City.
1. Lead crew able to do box prep, lid replacement, data capture of GPS, etc. ahead of install team to maintain productivity
2. Lid approach to vary by area/routes , potentially can address by planning in advance of installs to conduct audit of needed lid sizes/types
a. Lids from City on reserve for opt-out locations
b. Standard installs will have the lid replaced, not drilled
3. If service address is incomplete, house/location appears abandoned/vacant, if unsure that meter found matches account/address, or if considered non-standard install, mark as return to utility (RTU)/Skip
4. If unable to find meter box, mark as Skip and note “Cannot Locate”
5. If meter not on route list, installer to submit in email to City Project Lead, and City’s Program Manager, for validation of install; work order to be submitted outside of the Mass Meter Changeout (MMCO) process for manual entry into CIS by City staff
6. If customer refuses meter replacement or identifies they want to opt -out, flag work order as “Skip” and write “Opt-Out” in field notes; to be reviewed
7. If register is cloudy and reads are unable to be captured visually, safely break meter register to capture final read and for final read picture
8. If water is off at the meter, replace meter and leave water off and designate in work order as “Water Off”
9. If a leak found/suspected, mark as RTU and select “Leak”; also call City Utility Maintenance Supervisor or Project Lead immediately; City to decide whether to repair/replace on case-by-case basis
a. Call Utility Maintenance Supervisor before replacing meter b. If leak at curb stop, City will replace curb stop before meter changed c. If customer side leak, flag work order as RTU, take picture, and notify City
10. If meter lid broken, replace lid and identify in work order that new lid was used , including specifying specific lid
Specification No. WT-5080 Section 01 73 19
Special Provisions Page 5
11. Before cutting water off at meter, make sure meter dial not moving; if dial moving, installer should wait up to 5 minutes for the meter to stop; if the meter is still recording water usage, skip installation location and note in work order for site re-visit
12. Installer should replace meters with like size and type unless otherwise directed by City, Prime Contractor, or Program Manager
13. When an outside hose spigot is in the front yard, Installer should open spigot to flush air and debris from line after install
a. Installers to identify “unable to flush” for any locations with no outside spigot
14. City has pressure regulators and angle stops that are City owned/maintained in a separate box in front of each meter box. Installer to note on work order if no separate box with identifiable regulators and valves or if expected issue exists; City will then handle replacement accordingly
a. City will attempt to identify areas of particularly high pressure where regulators may present issues; Travis has spreadsheet for this
15. Installers shall leave property as undisturbed as possible replacing appropriate yard materials and shall properly dispose of all trash and debris found in meter boxes
16. Installers should be available for job shadowing by City staff during install
17. City will provide replacement meter boxes for use as needed a. Installer to mark as RTU; If City provides box for Installer to complete work, when used, installer to designate new box used in work order for proper tracking
18. Old water meters after being pulled for replacement should be placed in the box that the new meter came in; City staff to coordinate pickup/delivery from Vendor of scrap meters
a. Conex trailers to be kept organized by routes to allow for ability to locate meter; City staff will manage organization of old meters as desired
5.01 Digital Work Order Sample
The following table provides a sample of work order with expectations that the final fields and pictures to be captured will be finalized as part of the pre-project planning with the selected vendor:
Item Description Notes Drop Down Picture
1 Installer
Inventory
Load meter/register/MIU inventory into
installers possession on the app
2 Work Order Open the work order
3 Install Question
Able to Install, Yes or No. If No select from
drop down (Cannot Locate, Vacant Lot, RTU,
Customer Leak, Non-Standard Install, Broken
Valve/Curb Stop/Angle Stop, other).
Take photo of RTU if
not completing the
install
4 Verify Verify account address
4B Verify Exiting Meter/Register
4C Verify Meter Size
5 Account
Notification
Notify Customer that you will be
shutting off the water (Maintain Social
Distancing). If no one is at location,
check for water use. If no water is being
actively consumed, complete the
Specification No. WT-5080 Section 01 73 19
Special Provisions Page 6
Item Description Notes Drop Down Picture
installation.
6 Beginning Photo
Capture beginning
meter exchange
photo
7 GPS Obtain and verify accurate GPS Installer to verify location and move pin to correct position
8 Clean Pit Clean meter pit to allow change out
9 Final Read Obtain final read. Break register glass as necessary to obtain good read. Take picture of
reading
10 Shut off water/
breaker
If water, slowly shut both valves. If
there is an issue with the valve, stop
installation and notify the
Utility.
10A Complete the change out if valves shut
off the water.
11 Installation Install new meter/MIU with new
gaskets
Dual picture of old
meter with new
meter data sheet
12 New Meter Data
Load the new Meter and MIU serial number
from the Installers Inventory Drop Down.
Meter size is updated from
the Inventory data.
13 Antenna Place the antenna through the new lid
and connect to new meter.
Select Lid Changeout Survey Questions (Lid,
Drilled Lid or New
Lid) (Type of Lid Installed)
14 Magnet Swipe Magnet swipe the register
15 Bleed Lines Open water spigot to bleed the lines. Select Spigot flushing question (Yes, unable to access spigot)
Take photo of the
water flowing
at the spigot.
15A Open the valves slowly to pressurize
the system.
16 Check Install Check for leaks and correct, as
necessary. Take completed
meter install photo
16A Take lid install picture
17 Notes Add any special notes for the
installation
18 Door Tag Place completed installation door tag Take photo of the door tag
19 Complete Work
Order Complete the Work Order
19A Install Date will be provided as part of
the Work order completion.
6.01 Established Protocol and Situational Responses for Customer Contact The following section lays out general expectations of the City.
Specification No. WT-5080 Section 01 73 19
Special Provisions Page 7
1. Customers that ask questions of installers or other team members should be provided with copy of printed AMI Project Information sheet
2. Before install, knock on door and attempt to notify customer of install
3. Installer will make reasonable adjustments to the installation schedule to accommodate customer request
4. After install is complete, place door hanger on front door (or other access point like gate) and take picture
5. Vendor will respond to 100% of general citizen inquiries and calls from customers regarding project
6. Vendor will be responsible for investigating all customer complaints of leaks or issues with new meter immediately upon receiving a call. Vendor shall coordinate with the City and Project Manager regarding the issue and proposed resolution once investigated.
7. Customer complaints or service problems involving property restoration are expected to be resolved by Vendor within 1 day of complaint receipt
8. Project Team will collectively determine how best to route calls to and from City for issue escalation and general customer information requests
9. Follow established Covid-19 Guidelines
7.01 Established Protocol and Situational Responses for Issue Escalation The following section lays out general expectations of the City.
1. Reporting - Immediate
a. Safety issues that develop or are discovered, including worker injuries or vehicular accidents, or damage to public or private property
b. Media contacts
c. Significant leak at water meter or on customer side of meter – call Utility Maintenance Supervisor before replacing and attempt to contact customer to get authorization. Vendor will notify City and Project Manager immediately of any leak created by meter replacement work (whether observed or notified by customer).
Vendor shall be required to investigate immediately and work with City on resolution. Resolution of leaks caused by meter replacement are expected to be complete within 4 hours of identification of leak.
d. Escalated interaction or conflict with customer, customer complaint, and any damage claims
2. Reporting - Daily
a. Apparent minor leaks located on either side of meter b. Any errors discovered in the City’s database, such as meters not in database or meters that are noted as the incorrect size or type in the database ( “Need Validation” list)
c. Any water meter bypasses that are found in open position, in which instance installer shall also immediately take corrective action d. Any water meter that the installer was unable to flush or was identified in database as having water off
e. Need for additional maintenance at site
f. Need for additional assistance for site access (“Meter Locate”)
3. Reporting - Weekly
Specification No. WT-5080 Section 01 73 19
Special Provisions Page 8
a. Provide Project Manager with a progress report, installation schedule updates and production schedule status
b. List of routes/neighborhoods where installers will be in next 2 weeks c. Provide route saturation and install quality control report d. Material inventory update report
e. Return to Utility (RTU) list and resolution
8.01 Established Protocol and Work Requirements
The following section lays out general expectations that are subject to final negotiations and adjustment by the City.
1. Installer must be wearing safety vest and any additional PPE equipment necessary, carry proper ID badge, and have contractor decals on vehicle
2. All work should be performed between hours of 7:30am – 5:00pm Monday through Fridays; exceptions to these times must be approved by City (to be expected for commercial customers, but notify City Program Manager of schedule)
3. Onsite crews shall observe City noise ordinance and keep noise levels as low as reasonably possible and shall refrain from using lewd language in presence of the public
4. Crews shall observe designated smoking areas and always extinguish and dispose of smoking materials properly
5. Crew vehicles shall not violate municipal parking laws. Crew vehicles shall never be parked on private residential lots or driveways unless they have been given direct permission from the property owner
END OF SECTION
Specification No. WT-5080 Section 01 79 00
Special Provisions Page 1
SECTION 01 79 00 - TRAINING
A. The Contractor shall have a detailed training program in place.
B. The Contractor shall clearly define the number of trainees allowed for any or all types of training. Provide a training plan which outlines the requirements listed below. Plan should include facilities and resources required. Describe whether the training will be delivered via remote/web
or onsite instructor led training. Include in the response a sample of proposed training materials and training literature.
C. The Contractor shall train the City of Camarillo staff on best practice procedures for installation; the City of Camarillo staff shall be given the opportunity to shadow the installer during the project.
1. This shall include conducting onsite training with the City of Camarillo staff on the handheld equipment, software and processes for installati on, commissioning/
decommissioning, and troubleshooting.
2. The Contractor to provide training on warranty and RMA protocols and requirements. During the installation
project, the Contractor shall remain
accountable for all RMA but upon system acceptance, this responsibility will be assumed by the City of Camarillo.
D. The Contractor will conduct training of the City of
Camarillo’s maintenance personnel on
the installation, operation, maintenance and configuration of proposed AMI system including collectors, repeaters, meters and endpoints. At the end of training, maintenance personnel will understand proper installation and maintenance procedures.
E. The Contractor shall provide software system training relevant to services and support system documentation for each software system s
upplied. Training and documentation
for user interface and systems operation will include the following (at a minimum) to be provided in advance of training taking place and
upon request from the City:
1. System overview description and flow chart;
2. Program listings, functions, and logic descriptions;
3. File description and record layouts;
4. Description of all system controls;
5. Backup and
recovery procedures;
6. Standard operating procedures;
7. Descriptions of all reports and abili
ty to customize and automate/schedule;
8. Definitions and details of all alerts and alarms;
9. Operating system user manual;
10. Hardware technical documentation
F. Contractor shall i
nclude 8 hours of training in-person and 8 hours of remote training at a minimum.
END OF SECTION
Specification No. WT-5080 Section 01 93 10
Special Provisions Page 1
SECTION 01 93 10 - MAINTENANCE AND SUPPORT
PART 1 - GENERAL
1.01 GENERAL
A. Installation must be warrantied for a minimum period of one (1) year from the date of bid schedule completion for the Base Bid and Additive Alternate Bid 1 and project completion and acceptance for Additive Alternate Bid 2.
B. Contractor shall describe and/or disclose any common scenarios that are or are not included under installation warranty.
C. The Contractor shall include on-site or remote support services for the following items:
1. Meters
2. Transmitters
3. Network Devices
4. Installation Quality Checks
5. Installation Troubleshooting
6. Software Systems, Configurations, and Systems Access
1.02 SUBMITTALS
A. Submit expected response times for on- site and remove services of the items listed in Section 1.01.B.
B. Submit the cyber-security measures in place to protect the data captured by installation staff throughout a project.
C. Submit description of how upgrades to system components are completed over the communication network. If support for the component does not exist indicate if it is planned in the future.
D. Submit what outage or system degradation occurs when any firmware uploads or other configuration changes occur over the air.
E. Submit confirmation the firmware updates over the air includes validation that the software download process is secure and there is a corresponding log of who changed the software and when it was changed.
F. Identify if there is on-site or remote service offered for the following items and response times are noted in the comments section.
1. Meters
Specification No. WT-5080 Section 01 93 10
Special Provisions Page 2
2. Transmitters
3. Collectors/Network Devices
4. Installation Quality Checks
5. Installation Troubleshooting
6. Software Systems, Configurations, and Systems Access
7. Network Diagnostics and System Enhancements
PART 2 - MATERIALS (NOT USED)
PART 3 - EXECUTION
3.01 UPDATES
A. T he firmware updates over the air shall validate that the software download process is secure and there is a corresponding log of who changed the software and when it was changed.
END OF SECTION
Specification No. WT-5080 Section 33 09 09
Special Provisions Page 1
SECTION 33 09 09 - SOFTWARE
PART 1 - GENERAL
1.01 SUBMITTALS
A. Vendor shall commit to helping test all interface components and support a testing environment (separate from production) and work with the utility’s CIS vendor to provide data integration testing for a success rate of 100% before the meter replacement is authorized to move into production phase.
B. Software license and warranty shall cover all patches and upgrades, including new versions, for the life of the system at no additional cost beyond annual licensing.
C. The software system shall provide capability for the utility to collect data via walk-by/drive- by as needed.
PART 2 – MATERIALS
2.01 GENERAL
A. Provide all software, including third party software, necessary for City staff to operate and manage the AMI system and clearly list any requirements for accessing or operating software.
B. Contractor must develop, in collaboration with the systems sub -team, an automate d transmitter and meter swap data file that interfaces with the City’s CIS.
C. Provide a customizable file layout structure that will allow the City and its consultant to modify and expand the inputs for meter and transmitter change out data capture D. Develop an automated interface to accept customer and account information into the MDMS and provide read and alert data from the MDMS to the City’s CIS and Customer Portal.
E. The software shall be supported for a minimum of 15 years with 20 years desired. This includes enhancements, patches, and corrections of “bugs”, at no additional cost to City beyond the annual maintenance fee.
F. Vendor shall provide any firmware updates and support the City in creating a firmware test group approach that is recommended.
G. Contractor will be required to provide a “standard” source code escrow agreement and warranty or be willing to provide all source code to City should the Contractor cease to be in business.
H. Software shall operate and/or integrate into an existing Windows based operating system environment.
Specification No. WT-5080 Section 33 09 09
Special Provisions Page 2
I. Upon completion of the project, Contractor shall provide documentation, including detailed file mapping, and any code for any integrations built for the system.
2.02 METER DATA MANAGEMENT SYSTEM
A. If the solution proposed is SaaS, Contractor shall describe all components included in the coverage, such as head- end hardware and software, annual maintenance, licenses, support, etc.
B. The MDMS shall be accessed using City's preferred Internet browser (Edge or Chrome).
C. The MDMS shall be provided as a perpetual unlimited license to use the software with the supplied system, provided the annual maintenance agreement is upheld. A copy of the Contractor's Service Level Agreement shall be provided as an attachment.
D. The MDMS shall interface with the utility's CIS to provide reading files. Contractor shall describe the process for obtaining a read file for billing.
E. The MDMS shall provide the ability to generate error reports that identify which endpoints and data collectors have been inactive for a certain period. Proposing Contractor shall describe ability to push alerts or equipment errors to City's existing MDMS. City emphasizes system ability for push alerts based on customer usage settings for purposes of water conservation.
F. The MDMS shall provide for proactive exception alarms that can notify utility personnel via email or SMS text of desired exception conditions. Can be customized by threshold, groups, user types, geographic location.
G. The MDMS shall be capable of reading a meter "on demand".
H. The MDMS shall have the ability to remotely disconnect/reconnect meters that have that function built-in.
I. The MDMS shall provide standard operational reporting to include: meters and associated reads, meter communication failure, zero consumption, continuous consumption, vacant consumption, high usage, reverse flow events, leak events, tamper, etc.
J. The MDMS shall provide standard analytics reporting to include: high bill report, historical use trends, revenue forecasting, leak detection, etc. Contractor should detail how robust the reporting within MDMS is, providing a concise list and description of the pre- defined reports available.
K. The MDMS shall have the ability to have user -defined aggregated meters that can be configurable in a virtual meter or DMA group. Describe the methods for defining virtual or grouped meters and the ability to query and export any associated data related to these created groupings.
L. Contractor shall confirm if the City will have secure database access to create customized reports and exports as desired. Please specify any limitations to data extraction, whether API call limits, data format limits, etc.
Specification No. WT-5080 Section 33 09 09
Special Provisions Page 3
2.03 HEAD END SYSTEM
A. The HES shall secure and/or encrypt data during transmission. Proposing Contractor shall describe this process and protections in place to protect data being transmitted.
B. AMI solution shall provide an authorization process to validate any individuals “right of access” to the system Head-End or subsequent control and monitoring screens.
C. AMI Solution shall provide for data integrity to provide assurance that data as transmitted, displayed, or received by an end-device has not been tampered with.
D. The HES shall accept from MDM account, service point and hard meter configuration data for meters or communication modules that have been installed in the field to indicate which meters or communication modules should be heard from.
E. HES shall provide MDM with the current soft meter configuration information.
F. A ccept commands from within the HES, MDMS, and/or field device to change meter configuration parameters.
G. HES shall supply MDM with outage/restoration notifications at all levels of the system.
H. The AMI Solution shall accurately maintain and report system time synchronization across all devices to ensure accuracy of data including automatically adjusting for daylight savings time.
I. The AMI Head End shall have the ability to support multiple communications media, including radio and fiber.
J. Contractor proposed software should operate and/or integrate into an existing Windows based operating system environment.
K. City captures and transmits register reads in CF. For billing purposes, CIS truncates the reading to convert it to HCF. City desires the read resolution of CCF be maintained and that the MDM be able to convert the interval value and daily usage value to HCF.
L. The HES storage shall be a minimum of 30 days with 45 days at the transmitter.
PART 3 - EXECUTION
3.01 TRAINING
A. Provide training to Utility Staff that is comprehensive enough to enable staff to effectively operate all systems and software, maintain the system, and install all products offered.
The price as listed in the bid schedule shall include all travel related expenses. Contractor shall provide a Project Manager with extensive experience in system software interfacing to guide the interface project and all training on the HES. Characterize on- line and on- demand training programs with onboarding features and flexibility for on-site as needed.
B. Contractor shall submit integrations standards that detail the file specifications and provide a data transfer overview for the interface between the HES and Utility's MDMS
Specification No. WT-5080 Section 33 09 09
Special Provisions Page 4
and should include the automation of register change- out and the reading collection for billing process.
C. Contractor shall train on the process of obtaining readings (uploading and downloading data from the reading devices from the AMI system software).
D. Contractor shall train utility staff on the reports offered within the HES. Training shall include facilitation of report automation.
E. Contractor shall provide training and supporting documentation on error coding, messaging, and alert/alarm overview and management (to include definitions and recommendations for resolving alerts/alarms).
F. Contractor shall provide detailed training to the utility on the management of the network, to include understanding network alarms and diagnostics and key troubleshooting steps.
G. Contractor shall offer and include in the pricing sheet optional follow -up training for the utility after system has been operational for 6 months.
END OF SECTION
Specification No. WT-5080 Section 33 09 11
Special Provisions Page 1
SECTION 33 09 11 - SOFTWARE SECURITY
PART 1 - GENERAL
1.01 SUBMITTALS
A. Contractor shall describe the cyber-security measures in place to protect the network, equipment, software, and customer data and provide compliance with, but not limited to, ISO/IEC 27017 and ISO/IEC 27018
B. Contractor shall describe the data security in place to prevent and, in the instance of occurrence, recover, from cyberattacks and threats such as ransomware attacks.
C. Submit the security certifications currently held by the proposed solution.
D. Contractor shall describe the process for releasing and applying upgrades, bug fixes, and patches and share procedures in place to ensure these releases are fully tested and validated prior to release.
E. Describe the failover and disaster recovery provisions built into the system architecture.
F. Describe the security and reliability protocols.
G. Describe any required uptime and/or SLA for outage notification, management, and any targets or ticketing system in place.
H. Contractor shall hold cyber liability insurance in accordance with the Specifications.
PART 2 - MATERIALS
2.01 S OFTWARE SECURITY
A. The software shall comply with prevailing industry standard hardware, software, operating systems, databases, and user interfaces.
2.02 SOFTWARE SECURITY DESIGN
A. All SaaS shall be accessed using a secure socket layer (SSL) protocol with a trusted certificate from a certification authority (CA).
B. SaaS data shall be secured in Tier IV SSAE 16 certified data centers.
C. SaaS data shall be maintained in (or replicated to) more than one data center.
D. Software security shall provide two-factor authentication for cloud solutions.
E. The software shall be encrypted from register to end user application. Security requirements shall include general best practices and encryption at rest and in motion.
Specification No. WT-5080 Section 33 09 11
Special Provisions Page 2
F. The headend system shall provide robust data security measures to protect the utility’s data.
PART 3 - EXECUTION
3.01 GENERAL
A. SaaS data is the property of the utility and municipality and cannot be copied, shared, or sold by the vendor.
B. SaaS data file backup shall be properly scheduled and stored in a secure location.
C. Vendor shall provide server and network monitoring measures, backup process, and disaster recovery solution/plan that will be provided to the utility.
D. Contractor shall detail any user permissions, access management, and device authentication protocols in place to prevent malicious or inauthentic access to the system.
E. Contractor shall provide AMI software upgrades, including all security updates and patches. Contractor shall notify the City of maintenance when scheduled and conduct updates after hours so as to limit operational impacts. Please describe approach and notice given of updates.
F. Vendor shall assist the utility and its consultant on designing a strategy for conducting ongoing system monitoring and testing, (to include integration, performance, and systems).
G. Vendor shall promptly notify the utility of any unauthorized access of utility or customer data. SaaS database shall be fully retrievable by the utility and municipality.
END OF SECTION
Specification No WT-5080 Section 40 91 15
Special Provisions Page 1
SECTION 40 91 15 - METERS
PART 1 - GENERAL
1.01 SUBMITTALS
A. Submit the requirements for compatibility and include retrofit pricing for equipment (register, transmitter) and labor for consideration.
B. Submit a description of any expected or annual cost increases to unit costs for meters after project closeout.
C. Submit a description of the proposed meter(s) ability to effectively operate in conditions of hard water with high particulates.
D. Submit recommendations for inventory parts and ordering lead times to be included as available.
PART 2 - MATERIALS
2.01 MANUFACTURERS
A. Small water meters (5/8” x 3/4”, 3/4” x 3/4”, and 1”) shall be Neptune Mach 10 ®, Neptune T-10®, Sensus SRII®, or equal, and meeting 2.02 Meter Design requirements.
B. Large water meters (1.5” and larger) shall meet 2.02 Meter Design requirements and be manufactured by the same manufacturer as the small water meters.
C. All water meters shall be new, unused, and current models with the newest available version of firmware loaded.
D. All water meters shall be calibrated and tested for accuracy by Vendor prior to shipment.
E. All water meter registers shall be programmed by Vendor with the read resolution set in collaboration with the Utility.
2.02 METER DESIGN
A. All water meters shall be magnetic drive and Solid State, permanently sealed register, straight-reading, conforming to the latest AWWA C700 Standard.
B. Meters shall register not less than 98.5 percent and not more than 101.5 percent of the water that actually passes through it.
C. All water meters shall be built from lead free brass compliant with the latest NSF/ANSI Standard 61 Annex F and G and shall also meet the January 4, 2014 NSF 372 No Lead Standards. All Fire Service meters shall be UL listed and FM approved for fire service applications, meeting or exceeding NSF-61.
Specification No WT-5080 Section 40 91 15
Special Provisions Page 2
D. All meters shall have the size and the direction of flow cast in raised characters on the body of the meter.
E. All meters shall be provided with strainer screens of #316 stainless steel or plastic.
Screens should fit snugly and be rigid to prevent movement. Screens should have an effective straining area at least double that of the main case inlet.
F. Measuring chamber shall be of a suitable engineering plastic and shall not be cast as part of the main case. The measuring chamber for turbine meters 1-1/2 inches and above shall consist of a turbine self-contained unit attached to the cover for easy removal. The turbine spindles shall be stainless steel; turbine shafts shall be tungsten carbide.
G. Measuring chamber shall be complete assembly, factory calibrated to AWWA standards that includes the cover, registers, and both a turbine measuring element assembly. It shall be easily field removable from the meter body without the requirement of unbolting flanges.
H. The intermediate gear train shall be directly coupled to the turbine rotor and magnetically coupled to the register through the meter cover. All moving parts of the gear train shall be made of a self-lubricating polymer or stainless steel for operation in water.
I. Registers shall conform to the latest AWWA C707 Encoder standard. Registers shall be standard straight reading digital electronic encoder type communication devices.
Registers shall be pit-lid read compatible. Register must be hermetically sealed by the manufacturer.
J. Water measurement shall be cubic feet with resolution set to 1 cubic foot. Rate of flow (low and high) shall be noted for each specified meter size.
K. Register shall contain fully potted electronics and battery as well as carry an IP68 rating for submersion in flooded meter pits. The register and encoder shall be a manufactured product of the meter manufacturer.
L. Register boxes shall be of a suitable synthetic polymer with lid.
M. Registers shall have a locking device or sealing device which shall render them tamper proof.
N. The register for mechanical units must be designed so that it can be removed from the meter without removing or disassembling the meter from installation, under field conditions by City water division staff.
O. The solid-state encoder/register shall provide additional information remotely when connected to the MTU (i.e. detailed leak detection data, days of leak state, days of no consumption, and back flow indication). This information shall be communicated through the encoder protocol and MTU to the route management software to allow the seamless integration of data into a CIS file.
P. The register shall provide at least a nine-digit visual registration at the meter.
Specification No WT-5080 Section 40 91 15
Special Provisions Page 3
Q. The unit shall provide an eight-digit meter reading for transmission through the radio MTU.
R. The dial shall have a high resolution nine-digit LCD display for meter testing.
S. The register shall display flow rate information.
T. The register shall employ a visual LCD leak detection indicator as well as provide remote leak detection through an ASCII format to the MTU.
U. The manufacturer will guarantee that the reading obtained electronically matches the LCD odometer reading on the register.
V. The register should accumulate and register consumption without connecting to a receptacle or MTU.
W. Meters shall support all AMI functionality with two-way wireless communication. All water meters shall be able to communicate directly to the AMI collector. All water meters shall wirelessly communicate via an FCC approved and regulated spectrum.
The use of a cellular network is not permitted.
X. AII water meters shall be capable of 1-hour interval usage data. All water meters shall be capable of on demand meter read and status. Water meters shall not contain composite threads.
Y. All meter registers must be capable of connecting with MTU’s from other major utility manufacturers. Connections between meter registers and MTU’s must be a Nicor type or approved equal universal connector. Any connectors submitted as a substitution must demonstrate to the Engineer that they will retain compatibility across multiple suppliers.
Z. All water meters shall be able to communicate directly to the AMI collector via an FCC approved spectrum.
AA. All water meters shall have a 20-year warranty on register and body. Water meters shall have a 20-year warranty on battery (last 10 years prorated).
END OF SECTION
Specification No. WT-5080 Section 40 91 16
Special Provisions Page 1
SECTION 40 91 16 - NETWORK
PART 1 - GENERAL
1.01 SUBMITTALS
A. Submit a comprehensive network site plan including materials and specifications as well as detailed site diagrams and submit to City for review and approval prior to installation.
B. All the locations, elevations, and mounting options for collector placements shall be specified in the Network Site Plans.
PART 2 - MATERIALS
2.01 NETWORK
A. The proposed AMI system shall have the ability to be utilized for water meters and other sensors.
B. The proposed network shall be capable of utilizing existing City-owned ethernet network for backhaul.
C. The network shall be capable of utilizing City-owned fiber if available at proposed collector locations.
D. Solar power for collectors shall have a charge controller with remote diagnosis accessible by City employees.
2.02 NETWORK DESIGN
A. The provider shall provide access to network applications (software), including third-party applications of a component of the proposed network solution. City shall have login capabilities at the transmitter and any network devices.
B. The City shall have the capability to remotely monitor performance of collectors including power, backhaul, and operational conditions.
2.03 PROPAGATION STUDY
A. The propagation results should be certified, meaning that if any additional network infrastructure is needed in order to meet the above requirements for coverage and/or read rate success above what was specified in the propagation study, that infrastructur e equipment and the labor costs to install would be at the expense of the selected vendor.
B. Contractor shall receive 80% collector redundancy of network devices to the endpoints planned for reading within the propagation study.
C. The contractor shall provide a site plan and certified propagation analysis of the proposed AMI solution and guarantee 100% coverage and a minimum 99% read rate success of all hourly reads over a three-day read window.
Specification No. WT-5080 Section 40 91 16
Special Provisions Page 2
D. Network coverage design should accommodate for redundancy and ensure the coverage is consistent and provided for the life of the system when properly maintained.
PART 3 - EXECUTION
3.01 INSTALLATION
A. A frequency sweep shall be required before and after installation and results provided to City along with any required remediation actions.
B. The number of AMI network devices and the placement shall be determined by the propagation study.
END OF SECTION
Specification No. WT-5080 Section 04 91 17
Special Provisions Page 1
SECTION 40 91 17 - TRANSMITTER
PART 1 - GENERAL
1.01 DESCRIPTION
This section describes requirements for transmitters.
1.02 SUBMITTALS
A. Transmitter product information.
SPART 2 - MATERIALS
2.01 TRANSMITTER
A. The proposed transmitter shall utilize a Nicor connector for retro-fits.
B. Meter readings shall be time and date stamped.
2.02 TRANSMITTER DESIGN
A. The Proposed system must have AMI modules capable of interpreting incremental or encoded meter reading data directly from the new or existing three- wire meter registers without error.
B. MTU’s or endpoints must be able to read and store hourly interval data. The number of times data is transmitted to HES per day must be programmable. Each MTU shall store local flow meter data up to 90 days.
C. MTU’s must record and transmit the minimum following data/alarms over the network:
unique transmitter identification/serial number, meter reading, no usage status, meter tamper/theft detection, low battery, encoder error, remove programing, backflow, and leakage. It must also have an internal clock that is synchronize daily through the network and be compatible with the City’s existing Badger Recordall meters. Provide a list of all meters that are compatible with the MTU for future replacement of meters.
D. Service Providers must include warranted battery life and AMI endpoint life in the proposal. MTU’s must have a minimum battery life of ten (10) years and shall be warrantied for twenty (20) years (last 10 years prorated), when the system provides a minimum of 24-hourly reads per day (if less, please specify details and the proposed battery life).
E. All equipment shall be suitable for ambient environmental conditions. All system elements shall operate properly in the presence of telephone lines, power lines, and electrical and radio equipment. Radio frequency products must be protected against water or moisture.
F. All AMI endpoints equipment must be rated to withstand non- condensing temperatures from minus 40° F to +140° F.
Specification No. WT-5080 Section 04 91 17
Special Provisions Page 2
G. Meters and MTU’s shall be suitable for underground installation in existing meter vaults.
The transmitter shall contain a fully potted internal battery.
H. Data shall be transmitted between the transmitter and collector encrypted.
I. The transmitter shall be compatible with registers specified in Section 409115 METERS and can be programmed or modified to accept different makes or models of meter registers.
J. The transmitter shall be fully operable with all existing meters as presented within the City water utility system.
K. The transmitter shall operate in both AMI (fixed network) and AMR (drive- by/vehicle gateway) modes. Contractor shall describe the process for collecting reads in AMR mode and at what interval AMR receives reads.
L. The Contractor shall provide alternate options for transmitter connectivity should the network fail to reach certain areas of the service area. City prefers alternatives to cellular connectivity.
2.03 PERFORMANCE
A. Meters shall have a 15- minute interval reading available and supported by a standard warranty. The transmitter shall operate in a true 2- way mode with OTA capabilities for reprogramming and commends.
B. The proposed solution shall guarantee forward compatibilities of the transmitter to be supported on the proposed network and applications for a minimum of fifteen-year operational period.
C. MTU’s or endpoints must be able to read and store hourly interval data. The number of times data is transmitted to HES per day must be programmable. Each MTU shall store local flow meter data up to 90 days.
Specification No. WT-5080 Section 04 91 17
Special Provisions Page 3
PART 3 - EXECUTION
3.01 INSTALLATION
A. Refer to and comply with Section 017319 General Installation Requirements.
B. Contractor shall determine the minimum and maximum length of cable between the register and the transmitter and shall determine the recommended mounting location for the transmitter.
C. The installer shall confirm the transmitter is communicating to the network prior to leaving the premises and will notify the Owner how long it is before the signal is confirmed on the AMI network.
D. If a transmitter is not reporting to a collector or the AMI server, the transmitter shall be read with a handheld unit remotely.
E. Contractor shall be required to capture, at a minimum, the following data at the point of install (list is subject to change and can be expanded and modified by the City):
1. Meter read
2. Lid type
3. Water service status (on/off) at time of replacement
4. Meter size
5. New meter ID
6. New transmitter ID
7. GPS point capture
8. Additional appurtenances used
9. Field notes
END OF SECTION
Specification No. WT-5080 Section 40 97 50
Special Provisions Page 1
SECTION 40 97 50 - SMART SENSORS
PART 1 - GENERAL
1.01 SUBMITTALS
A. T he proposed system must provide a method to analyze District Metered Areas (DMAs).
B. The proposed system must allow for the integration and ability to accommodate leak detection sensors.
C. The proposed network infrastructure shall support qualified third party IoT or sensor equipment. The City considers any network data, including third -party devices and device-level details to be the property and rights of the City. Contractor shall provide access to any network software and/or application data to the City.
PART 2 - MATERIALS
2.01 GENERAL
A. Smart Sensors shall support third party IoT or sensor equipment. Network protocol and requirements any shall also be provided.
END OF SECTION
APPENDIX
WT-5080
APPENDICES
A. Service Locations
B. Summary of Assets for Network Infrastructure
C. Network Site Plan Template
D. Network Acceptance Plan
E. Systems Acceptance Plan
F. Route Acceptance Plan
G. Systems Topology – Current and Future
H. Standard Forms
1. Stormwater Quality Pollution Control Plan
2. Construction & Demolition Materials Management Plan Estimate for Capital Projects
3. Final Report – Construction & Demolition Waste Letter of Documentation
4. Notice of Potential Claim
5. No Parking Sign Example
I. Prevailing Wage Rates
APPENDIX
WT-5080
APPENDIX A – Meter Routes
1. Meter Routes (4 pages)
2. Service Location Data - This can be sent upon request via email. Send request to [email protected].
C O R T I N A( P V T . )C A M I N O
( P V T. ) LN .
( P V T. ) LN .
( P V T. ) LN .
( P V T. ) LN .
B R I D G E P O R T
O N D A
( P V T . ) D R .
B A N D E R A( P V T . ) D R .
D E L P R A D O
( P V T . ) D R .
E S C O N D I D O
D R .( P V T . )
E S T A N C I A ( P V T. ) P L .
R A N A ( P V T . ) P L.
C O R T E ( P V T. )
D E D E B E S A
PAS E O
VE RD E (P VT. )
ST.
DE SE O
A V E.
VIS TA M O N TA N A (PV T.) S T.( P V T. )
D E M A R E JA D A
C A L L E
CH U C KA R
(PV T.) LN .
O RA N G E ( PV T.)
LN.
ALO S TA ( PV T.)LN.
ALO S TA ( PV T.)
PL.
(PV T.) WY.
PARK
WEST D R ( PVT)
E . E D G E WA T E R
E . D O C K S I D E
E . P I E R S I D E
B
CIR.
H U G H E S ( P V T . ) R D .
( P V T. )
(PVT.) A VE.
HORIZ ON
(PVT.)
A I RPORT WY .
A VE. (PVT.)
DR.
S KYWAYE U B ANKS ST.
(PVT.)
(PVT.)
A VIATI ON DR. ( PVT.)
WILL IS
(PVT.)
DURLEY
8 FREEDO M PARK DR.
CONVAIR ST.
P O ST ( PVT.) ST.
(PVT.) ST.
HOUCK
S T INSO N
(PVT.) ST.
26 P O ST ( PVT.) ST.
(PVT.) ST.
S T EARM AN
JO N N A
C I R .
H E B E R T
D R .
C I R .
H E B E R T ( P V T . ) . D R .
JO N N A ( P V T . )
B R I A N
( P V T . ) C I R .
B R I A N
C I R .
M A L LA T T
WY .
R O B Y N
WY .
S U E
LN .
WI L D O N R D .
LO I S L N .
P
H
E A
S
A
N
T
H
I
L
L
( P
V
T
. )
LN .
( P V T . )
LN .
D E E R
H U N T E R
C A M I N O
( P V T . )
T0 L U C A
C A LL E
LO S G A T O S ( P V T )
( P V T . )
B A J A C T.
B A J A C T.
( P V T . )
V I E J O D R .( P V T . )
C O R O N A D 0 C T .
( P V T . )
LI D O C T .
( P V T . )
( P V T . )
C A P I S T R A N O C T.
M O N T E V I S T A ( P V T. ) D R .
H O LL Y ( P V T. ) D R .
( P V T . ) D R .
D E L
P R A D O
( P V T . ) C T.
JA L I S C O
( P V T . ) D R .
S O N O R A
( P V T . ) C T.
TA X C O
( P V T . ) C T.
D U R A N G O
( P V T . ) D R .
C H A P A LA
V I S TA ( P V T. ) D E L S O L
E L S O N E T O
C T. ( P V T . )
C O R T E
LE JO S ( P V T . )
LO S A LI S O S
C T. ( P V T . )
CALLE
SEG UN DA ( PVT.)
PASE O LO M A (PV T .)
LO S
S A N T O S C T .
TI E R R A
B U E N A
L A VER AD A
(PVT.) C T .
A V E N I D A ( P V T. ) M A G D A L E N A
A R R O Y O ( P V T. )
P A S E O ( P V T. ) D E C O R TA G A
V I S TA ( P V T. ) D E L S O L
D E L V A LL E
C A LL E ( P V T. )
M I R A S O L
D E L M A R
P A S E O
C A LL E( P V T. )
M I G U E L
P A S E O( P V T. )
A R R O Y O
P A S E O ( P V T. ) L U N A R
C A L L E
( P V T . ) C U E S T A
AG UILA
CALLE
(PVT.)
CALLE
ESC OR IAL
(PVT.)
CALLE
DE
L A
RO SA
(PVT.)
(PVT.)
R
O
SAL
VIA
P I C A D O D R .
V I A ( P V T. ) C A N T I L E N A
C A LL E ( P V T. ) A R G O LL A
V I A M E D A N O S
C A LL E O R O V I S TA
P A S E O ( P V T . ) S A B A N E R O
C A LL E
R
A
N
C
H 0
FR O N T E
T
A
H
Q
U
I TZ
D R .
T
A
L
U
D
T
E
R
R
A C E
T R A
N Q
U I L A
TR A N Q U I L LA
C I R .
D R .
R A N C H OA D O L FO
( P V T . ) C T.
C A LE T A
( P V T . )
TA H Q U I TZ
C T.
A D O L FO
( P V T . ) D R .
D R .
C T.
C A LE T A
A
C
A
L
L
E
( P
V
T. )
D E
D E
B E
S A
C O R T E ( P V T. ) D E E N C I N I T A S
C O R T E ( P V T. ) D E Q U I N T E R O
CO R TE
(PV T.)RIV IE RA
CO R TE
(PV T.)
AU G U STA
(P
V
T
.)
A
V
E
N
ID
A
DE AU TL AN
J EWEL (P VT ) CT
S T E R L I N G H I L L S
( P
V T
.)
D R .
AVE N ID A
(P
V
T
.)
D
E
AU TLA N
P
A
T
IN
A
(
P
V
T
.)
C
T
.
TO WE R
( P V T .)C T .
CLU B
(PV T.)
CT.
DIA M O N D
(P
V
T
.)
DR .
D
IA
M
O
ND
(PV T.) DR .
LA P LATA
GO
LF
V IL LA
(PV T.) D R .
(PV T.) W Y.
DE L TIO(PV T.) C T.
M A XIN E
WILDE N
(PV T.)
C A M I LA R
M
L
A
E
S
W
N (PV T)
E
C
TNE
TH O ST (P VT.) D R .
SA NT A
C
R
U
Z
M ISS IO N TR .
( PV T.)
(PV T.)
( PVT.)
PL
.
(PVT.) LN .
(PVT.) D R.
( P V T. )
D R .
Y
.
WY.
G YP SY (P VT.) LN .
ALO S TA
C A M P A N E R O
C A LL E ( P V T. )
LO RI LN . (P VT.)
C O U NT R Y V IE W
PIN O ( PVT. ) C T.
BE LL
(PV T.)
CT.
RE SE D A(PV T.) C T.
RIO
HA TO
(PV T.)
(PV T.)
RD .
HU E RTA
( P V T . )
M O N T O Y A
V I A
M ENT A ( PVT .) L N.
GR AC E (PV T .)
CT.
M AR IS SA
LN.
(PV T)
S A N L E A N D R O
P L A C I TA ( P V T . )
A N TE R O
( P V T. )
S A N
A V E N I D A
S A N R U FI N O( P V T. )
P L A C I TA
S A N D I M A S
( P V T. )
P L A C I TA
( P V T. )
G A R C E S
A V E .
S E M I N A R Y
( P V T . )
R D .
BEL L R AN CH ( PVT .) RD .
OLD SO M IS (PV T .) R D.
C A LE T A ( P V T. ) D R .
C T .
V I LL A M O N T E
V I A M A N TI LL A
( P V T . )
( P V T . )
( P V T . )
R D .
CA M IN O A VE LLA N A
CA LLE S E RR A
VIA AR A N D AN A
VIA SE C O YA
V I A A C I A N D O
LO S D A M A S C O S P L.
LA T UN A C T.
CO R T E A R BU S TO
LA S V E R E D A S P L .
R O M E R O
P L .
M A RR ISA (P VT)
CALLEBRISA
VALER O (P VT) W Y
(PVT)W
Y
RO
SETTA
SANTO
DOM
INGO
(PVT)
WY
(PVT)
CED AR BR OO K
(PVT) WK
(P VT
)DR
.
R O CK H AM PTON
SHA DET REE
(PVT) WY.
L IG H TWO OD (PV T) ST.
I V Y
GA RD EN
(PVT) CT.
GLE NP OST
(PVT) DR.
VIA (PV T .)
P ALOM A
CALLE ( PVT.)
PARA DO R
VIA (PV T .)
L IS BO A
VIA (PV T .)
SINTR A
V I A ( P V T. )
M A R I S M A
V I A ( P V T. )
G A B I LA N
CAM INO (PV T .)
ALGA RVE
CAM IN O ( PVT.)
VALVER DE
CALLE ( PVT.)
VIEJ O
R E FU G IO
CT. (P
VT
)
AUB UR Y (PV T)
PL.
VIA(PVT)
REA LVIA SER EN A
(PVT)
VIA BO NITA
(PVT)VIA
DEL(PVT)SOL
VIA(PVT) PRESIDIO
(PVT) CT.RIVE RD ALE
SUM E RTO N (PVT) CT.
BRO O KSH IRE (PVT) CT
V
IA
RO
SAL
(PV
T)
DURLEY AVE
A VIATI ON DR.
A V I A T I O N D R .
MAIN ST
B O WLI NE BLHIGH ANGL E HWE M ORY L N
PASE O D E LO S PE T A LOS
AVEN IDA DE M A RG AR ITA
VIAALLEGRA
VIAALLEGRA
C
ALLE D
EANEPOLA
POSADA
LILLIA
P
ETA
LO
CIRCULO
JARD IN
ANCHO RS DOWN (PVT ) WAY
ENCINO
(P
VT)D R.
HIG H LA N D
TER R A CE (P V T)
E CA LL E LA G UER RA ( PVT)
CALLE LA GRANADA(PVT)
CALLE
ELC
ONDOR(PVT)
CALLE ELAVION(PVT)
CAMINO
LAM
ADERA(PVT)
C
ALLELA
CUMBRE(PVT)
CALLE
ELHALCON(PVT)CALLELA FIESTA(PVT)
CALLEEL BOSQUECILLO(PVT)
CALLE
LA
GRANADA(PVT)
PASEO GIR ASO
L
DELRAYO CT.
CAM IN O
AVELLAN A
VIA AC IA N D O
YORBA
LIND
A
P
L.
SOBRE(PVT. )COLINAS
PL.
G
ALAN O ( PVT.)DR.
N
OV
INA
(P
VT.)PL.
LAVETA
(
PVT.)DR.
G ALAN O ( PVT.)DR.
PAS EO
ESP LEND IDO
(PV T)
VIA AC OR DE (PVT.)
SAN TA SUS AN A (PVT ) RD
SAG E BR O OK ( PVT) C T
CO LD SP RIN GS
(P VT) C T
SIL V ER SAG E
( PVT) C T
STO NEG ATE (PVT) RD
STAG E TR AIL (PVT ) RD
CAR RIZO C REE K (PV T) RD
NU EZ ST
NU EZ
S
T
CAS TIAN O S T
M A NZA NO ST
RO BLES ST
PION EE R (P VT) S T
PRA IRIE
(PVT)
ST
SAWB UC K
(PVT)
ST
M U STAN G (PVT) ST
T O WN S ITE PR O M E N AD E (P VT )
EA
R
L
JO
SE
P
H
(P
VT
)D
R
SETTLE R
(PVT) ST
C
AM
IN
O
TIER
R
AS
AN
TA
(PV
T)
SAN TIAG O S T
PROM EN ADE DR
TOW N C ENT ER E AST (P VT)
M IA N P LAZA
SER RA (P VT) S T
PED RO (PV T )ST
GA SPAR (PVT) S T
SEBA STIA N
(PVT) ST
VISC AINO
(PVT) S T
SO L A RE S (PV T) S T
M A RTIN A(PVT) STDO M ING UE Z (PV T) ST
K A Y L E E L N
WE S TL A N D
D R
O U T R I D E R LN
D A S H LN
M O R T E R LN
M A R S H A LL D R
WA G N E R LN
M A R LE E LN
R E N D A R L N
B R Y A N T D R
WEST PARK CT (P VT)
M IK E LO ZA D R (PV
T)
ARB OLE DA R D
SAFFR O N C TJOVA
NA
C
T
REX TON D R
S E M I N A R Y
PARK WES T DR (PVT )
PARK WES T DR (PVT )
B L EVE BL
OLD SEM IN ARY (PVT.) R D.
C A M A R I L LO P L A Z A ( P V T . )
PEC
A
NA
S
T
R AN CH O
C
A
M
PAN
A
(PV
T)
EDWA RD SC HO LLE D R (P VT)
EDITH RO U SE D R (P VT)
WELLSP RIN G
ST (PV T)NED CH ATFIELD DR (PV T)
PO ND ERO SA DR
GU Y TU RN ER D R ( PVT)
VIA TIVO LI
CALLE A RM ISTA D
VIA CH ELSE A
CALLE A L TAM IR A
VIA ALM AR
CALLE C AS TILLA
VIA BE ATRIZ
CALLE D E PA LM A
VIA ZIBE LL O
VIA VALLAR TA
CALLE C AM P ESIN A
CALLE D EA RIBO
VIA CO R T A
CALLE A RO M ITAS
VIA HE RM O SA
R
U
B
IO
AV
EUCLID
AV
AL LEY 8
A L LEY 10
BENT
TW
IG
AV
BA
JA
V
IS
TA
W
Y
W
E
S
T
O
N
C
I
COR TE
EST RELLA
C
ALLE
SUERTE
B
U
EN
O
S
TEM POS
DR
W
O
LV
E
R
TO
N
A
V
RAEM ERE ST
SENAN
ST
AL B ORA D A D R
CORTE ELEGANTE
GRA H AM A V
CO M A N C
HE
CT
D
A
W
SO
N
D
R
O
B
R
IE
N
C I
S
IE
RR
A
M
A
D
R
E
D
R
RO
SEW
O
O
D
AV
AL LEY 1
VIA PESC ADO R
BEECHWOOD
ST
PLA
Z
A
D
E
L
R
A
N
C
H
O
CO RTE
CABALLO S
S
PAR
KM
AN
AV
CO RT E SOL
SKEEL
DR
C
A
LLE
M
A
D
U
RO
CHARTER
O
AK
D
R
FO UNT AIN
GO LDEN
AVENID
A
DE
APRISA
HUNT
CI
O LIVO C T
CALAM
AR
CT
PA
SEO
M
ARAVILLA
ALTA
COLINA
RD
H EDGE LN
VIS
TA
P
ALACIO
RANCHO
CALLEGUAS
FEN
MOR
E
A
VVIA
ARACENA
V
IA
OLIV
ERA
GRANDVIEW
CI
BROO
KHILL
DR
AL M E NDRO W Y
MESQUITE
ST
CALLE
PORT IL LA
SHARON
D
R
K
E
N
N
E
T
H
S
T
D
AR
A
S
T
CALAVERAS
DR
R
O
W
LA
N
D
A
V
DWIG HT
A V
CO RBY
AV
A
G
U
S
TA
AV
RE GE NT S T
AN
A
C
A
PA
D
R
MU
RRAY
AV
E L C ORT IJO
P L
CO
RTE
O
LIV
AS
BO
R
D
E
A
U
X
AV
C
A
LL
E
CIRCU LO
BR
O
OKH
AVEN
AV
AVENIDA
GAVIOTA
LYNDHUR
ST
AV
BAYW
OO
D
AV
VIA CU PERT INO
GLENN
D
R
WAVERLY
AV
VIA
M
AR
QUESA
CAMINO
LA
MADERA
DEW
AYNE
AV
VIA
ALONDRA
K
E
N
D
A
L
L
A
V
CALLE
C
ITA
LA
N
TA
N
A
S
T
MODESTO
AV
CRO YDON
AV
EAST PAR K
ABBO
TT
AV
D
UR
K
IN
S
T
G
EM
IN
I
AV
VALLE
LIND
O
DR
GRACIA
ST
MARCO
DR
W
A
LK
E
R
AV
CAMINO
T IERRA
SANTA
ALIENTO
WY
AVEN
ID
A
V
ALEN
CIA
L
A
K
ESID
E
A
V
SHEPHERD DR
VIA
PACHECO
APPLETREE
A
V
EL CAPITANPL
CO LO NIA PL
ALL EY
9 CR EST VIEW AV
F
ULTON
ST
B
R
A
D
F
O
R
D
AV
DEL N OR TE
RD
CO RT E LA CIENAGA
VISTA DEL
MAR
AV
N
O
R
D
M
A
N
DR
W
V
E
N
T
U
R
A
B
L
CALLE LARIOS
VIA
ZA
M
O
RA
C
A
L
LE
S
AN
PABLO
CO
NSTITUTION
AV
CALLE
E
S
CA
LO
N
B
E
LD
E
N
AV
PARK N
RIDE BL
VERDUGO
WY
VIA
TERRAD O
CA LLE CA RG A
ALL EY 6
AVO
CAD
O
PL
M C CULL OC H ST
L ONSD ALE ST
SHERBO RNE ST
FAR NWO RT H ST
DER BY ST
SH ALIMAR ST
G OR M AN ST
W IL CO X ST
C ANO GA
PL
S
E
Y
B
O
LT
AV
S
O
U
T
H
FIE
L
D
R
D
PAR RON
S
T
C
A
R
T
A
G
E
N
A
S
T
AL LE Y
RIPL EY ST
BEAR
D
SLEY
RD
SH OR EL IN E ST
SA
N
C
H
E
Z
D
R
B
E
N
IT
O
D
R
M
A
R
K
ER
AV
C
IPR
IAN
AV
ROM
AN
AV
CO RTE REG ALO
SEREN O
PL
M
AR
VISTA
DR
T RUM AN ST
PICKW IC K DR
FARIA
ST
W. VENT URA BL
CAM
B
O
N
A
V
ACA
CIA
ST
CALLE
CONVERSE
LA
MARINA
D R
EN CINO AV
E
M
P
R
E
S
S
AV
DUV AL L AV
CO RT E M ALPASO
KIM BERLY AV
FIESTA DR
CAM
ARILLO
RAN
CH
R
D
MAYA
LINDA
LEATHERW OOD ST
CALLE
TESORO
G
E
N
E
IV
E
S
T
TIFFA
NY
C
T
DORM AN
ST
MILPAS
ST
REDDINGTON
CT
PONDEROSA
DR
SANTO
DO
M
IN
G
O
CAL LE ALT O
C
A
LLE
C
A
M
E
LLIA
MERCED DR
ALTA
SAGU
NA
CT
BANCRO F T ST
G RANG ER ST
VISTA
MERCADO
JA
Y
AV
C
A
L
LE
P
LA
NO
LA
CULEBRA C
I
B
A
R
TO
N
A
V
SP A NIS H M O S S
PL
PARKHILL
CT
VIA
VELA
C
A
L
LE
LA
R
O
C
H
A
LATH
AN
AV
A
CALA
ST
CALLE
ALBERCA
FAYTON
CT
LEVEN
AV
C
A
L
LE
L
A
P
R
A
D
A
HERRO
N
CT
HA CIE NDA DR
CORT E
PA S TO RA L
FIELDGATE
DR
VA
LLE
Y
VISTA
DR
M
ARDIGR
AS
CT
DARN ELL CT
ALGONQU
IN
C
T
LEAFW
OO
D
D
R
CABRILLO
MESA CT
D EERFIELD CT
BALM OR AL C T
PE P P E RW OO D
DR
D
O
MIN
ICA
C
TE
AVIADO
R
ST
BOG ART ST
FA
IR
C
H
ILD
AV
CAMARILLO
CENT ER
DR
CORT E
VIE NT O
G
LENBROO
K
AV
GREEN VALE
DR
TA NGL E WO OD
DR
HUG HES DR
RID DE N S T
GRE E N
GLA D E
CT
CORT E
AG UA CA T E
CORT E
GO LO NDRINA
CORT E
COL IN A
K
E
LLE
Y
AV
NELLOR
A
ST
FO
RAR
CI
ALLEY
4 ALLEY
2 CORT E
CA S TA NO
BRAM BLE CT
CHRIST INA
C T
CALLE
NAVARRO
M ARIANO
ST
C
A
M
B
R
IA
CT
AVENIDA
ACASO
H
E
DO
N
CI
ALLEY
15 CHU LA
VISTA
C
T
CA M INO
RA NCHE R O
SA N TA A N ITA
CT
W
OO
D
R
D
VIA
LEAL
CAMIN
O
ESTRAD
A
YE A R LIN G
CT
HELMA CT
BIG HO RN
CT
R O YCE CT
PL A ZA LA
VIS TA
CALABRIA
CT
WO ODG A TE
CR
BARCA ST
SUN
ER
C
I
TRE E FE RN
CT
OR CH AR
D
VIEW
PINE H URS T
PL
CREST VIEW AV
VIA
AL CA ZA R
AL OHA
ST
VIA DE LSU E LO
CORTE
TU
LA
ROSA
CORT E
VINA
DE X TE R
ST
SEQUAN CT
EL NIDO
ST
TIE RRA
LIN DA
CT
P
AS
E
O
C
A
S
T
ILLE
C IPR ES CT
HABR A CT
PR IM A C T
CA S TA NO DR
CAM INO VE
RA
CRUZ
VANGUARD
DR
TEJO N C T
ST O NE -ME A D OWCT
PL AT E A U
CT
VIKING
DR
CA
MINO
ALVAREZ
OA K HUR S T
CT
W
ESTW
OO
D
DR
VERD ULERA ST
DAW S O N
PL
PARKWAY
DR
JU
LIA
C
T
CA NT ER
AV
DA P P LE
AV
FACTO
R
Y
S
TO
RES
D
R
H
ARRIS
AV
SE R A PE
PL
PA S E O
YO LO
ALL EY 13
CORT E R OS A LINDA
LE AT HE R-
WO OD
CT
CA
MEO
CT
A
S
H
B
U
RY
C
T
DAPHNE ST
CALLE MA
PAC
H
E
CO RT E
FRONDOSA
C LA
YTO
N
CT
HOBART
DR
CREST VIEW AV
KIN O ST
BEVERLY
DR
C
E
R
R
O
V
IS
TA
W
Y
A L LEY
12 SIERRA
MESA
DR
BO LLIN
AV
MA N DA LA Y
CT
R ED O AK PL
KARENACT
BRIARF IELD ST
ESTON
ST
BE T T INA
CT
M ILBURN ST
A
V
EN
ID
A
S
O
LT
U
R
A
CO E
ST M
IL
LIG
A
N
D
R
CORTEFRESCA
BERW ICK ST
BLUE
OAK
ST
LANDEN
ST
VIA
LA
SILVA
CRANBRO OK
ST
SP
IN
D
LE
W
O
O
D
AV
CA LLE T E CA TE
M ESA
DR
LA
UREL
PARK
CI
RIVERM O RE
ST
GRAN DVIEW
DR
F RANC IS AV
S
TA
U
N
T
O
N
S
T
CORT E
CORRIDA
PL
ASHBURY C T
CASTANO
ST
F
A
LLEN
LE
A
F
AV
RIDG E
VIEW ST
P
IC
K
E
T
AV
BRON SON ST
EL
R
ANC
HO
D
R
CAL
LE
T
IE
R
R
A
VISTA
W ENDELL ST
FO RTUN A
AV
L EONAR D
S
T
PO G GI
ST
JA
P
O
N
IC
A
AV
P
A
LM
E
R
A
V
KLAM
ATH
DR
ID A ST
S
W
E
E
T
W
AT
E
R
AV
SU NGR OVE DR
STILES
AV
VIA DEL NOG AL
LA
K
E
H
U
R
ST
AV
S
ATUR
N
S
T
SHIRLEY ST
DUM ET Z ST
SP IND LE -
WO OD
CT
CALLE
CANCUN
RAM ONA
DR
PE O P LE S
AV
VIA
TO
M
AS
G ENEIVE
CI
WINDS O R
CT
A Q UA
V ER DE
CT
CU RT
DR
AILEEN ST
NE WQ UIS T
CT
HACIENDA
CI
VISTA
COTO
VERDE
SOR REL ST
CHE LS E Y
CT
DEERH URST
AV
A N GUIL A PL
VIA
CALDERO N
VINCENTE
AV
G
R
E
E
N
L
AW
N
AV
A L M ENDROCT
LADERA
VISTA
DR
CALLE COVINA
MISSION
LEW
IS
RD
PLEASANT
VALLEY RD
PLEASANT
VALLEY
RD
CENTER
SC
HO
O
L
R
D
CENTRALAV
FAIRW
AY
DR
ADOLFO
RD
TEM
PLE
AV
VALLEY
VISTA
DR
ADOLFO
RD
LA
S
PO
SAS
R
D
CA
RM
EN
DR
A
RNEILL
R
D
SANTA
RO
SA
RD
LAS
POSAS
RD
SOMIS
RD
LEWIS RD
LEWIS
RD
PLEASANT VALLEY RD
ELNIDOCT
STONETREE AV
EU CLID A V
ELM
DR
PALM
DR
JAPONIC A
CT
PASEO
M
ONTELENA
CALL E
MEND OTA
JO
S
E
AV
LUCEROC T
L
E
X
IN
G
T
O
N
C
T
PANCHO
RD
CEBOLL A D R
CO RONA
ST
SAN YS
IDR
O
S
T
CAM INO
ESPLENDID O
CALLE
HIGUERA
SA U S AL IT O
DR
CO LONY
DR
CORTE BARROSO
O RENA
CT
C
A
LL
E
LA
PA
L
M
ER
A
EX E T E R
CT
CALLE
L
A
R
O
D
A
AVENIDA
DEL
M ANZ ANO
GE T M AN S T
O
AK
ST
M
E
R
R
IT
T
A
V
FIR S T
CALL E LA
SO M BRA
H
ILLC
R
E
S
T
DR
APPLET REE
CT
ALTA
VISTA
PL
DU NNIGAN ST
SU NRIS E
CT
LU
NA
DR
BREACTC
A
LL
E
B
E
LL
A
V
ISTA
FENM OR E
CT
ELM A
ST
AS H DA LE
CT
M AGN OL IA ST
CALL E
LA G UERR A
EDGEM ONT D R
V I A
JACARA
CALL E
A R GO LLA
BAR RY ST
LO MITA ST
CALLE
LA
C
UM
B
R
E
PL A CITA
BU E NA
ROS A
B
IS
C
AY
N
E
AV
RO CKLYN
ST
APPIAN
VIS TA
CI
LOS NO GAL ES ST
V ET ERANS
WY
ANT ONIO
AV
MA Y B RO OKAV
SELBY CI
DANBROO K
AV
ALLEY
3 CHE RO K E E
CT
PASEO
BAR
O
NA
HAR TNEL L
ST
CALLEVISTA
B ED FO RD
CT
VIA
CORZ A
C
E
N
TE
N
N
IA
L
A
V
BELAIR
CT
AM BER
DR
GER M AIN ST
CORT E
CE RRITO
W
EST
LOOP
DR
A L LEY 11
ASCOT PL
B E LM ON T A V
M
O
B
IL
AV
LUCERO
ST
TEMPLE
AV
LOR E TA
CT
GRA V E S
CT
LO
M
A
D
R
TAM AR IX
ST
KN IG HT
RON DO
BURNL EY ST
B
R
IARF IELD
ST
G ARDENIA
AV
C HAPEL DR
B
A
R
C
E
LO
N
A
S
T
BA Y WO O D
CT
M
ORENO
DR
HAY DE N S T
CO
TTAG
E
G
R
O
V
E
A
V
FLO
R
A
V
IS
T
A
A
V
LEM ON
DR
K EYSERROND O
MCL EOD
ROND O MARSHROND O
M UN SON
S
T
GE M INI CT
IS LACT
CORT E
TE LA
DELG ADA CT
G
R
A
N
A
D
A
S
T
CORT E
OLM O
EL CARAZ O N CT
YOLAN DA
ST
JAPONIC A
P L
DWIG HT
CT
DWIG HT
CT
PASEO
CAM ARILLO
DWIG HT
AV
M
ISSIO
N
DR
S
TO
N
E
M
E
A
D
O
W
D
R
CORT E
AZ A L
CORT E
A M IG OS
VIS TACT
IR OQ UO IS CT
APACHE CT
SA B E T
CT
CH APEL D R
SEVILLA ST
WAVERLY CT
VENT URA BL
CAM
INO
CASTENADA
EARL
JO
SEPH
DR
CEDAR
DR
CAM
ARILLO
ST
BRENTLY
AV
ALLEY
5 CHAN DLER ST
PLEASANT VALLEY RD
TRELLIS
PL
BRIDGEH AM PTO N WY
VIA RO SAL
BE
LLAFONTECT
BRIDGETO NWY
PO ND DR
BRID GEHAM PTO N W Y
B
R
ID
G
E
H
A
M
P
TO
N
W
Y
ST
PETIT ST
B
R
IARF IELD
ST
GRADA
AV
DEL
CIERVO
PL
LA
PUMA CT
DESEO
AV
CA M INIT O
LUIS A
ESTABAN
D R
CA B R ILLOW
Y
TW
IL
IG
H
T
C
T
C
ER
R
O
C
REST
DR
GARRIDO
DR
LA CRESCENTA
DR
TRELLIS
PL
ALTAMONT W Y
CALLE
DEL
N
O
R
TE
R
A
M
O
NA
PL
G
ARD
ENIA
AV
VIA
V
EN
E
T
O
TIVERT O N DR
M
AR
SALA
W
Y
VIA
DULCE
CALLE
DESCANSO
AV
ENID
A
NAV
IDAD
PADRE
LN
MESA
DR
F AIRWAY
DR
VIA
SECOYA
C
O
M
M
ON
S
PARK
DR
LA
N
TA
N
A
S
T
G
OLD
ENSPUR
D
R
CAM IN O C O NCORDIA
LOM A DR
C
E
LE
ST
IA
L
P
L
VA LLEY VISTA DR
A
LO
STA
DR
VISTA
DE
L
CAMPO
MISSIO N
DR
H
IG
HLAND
DR
LAS
PO
SAS
R
D
AVOCADO
PL
WRIGHT
RD
O
C
E
AN
VIEW
DR
CATA
LIN
A
DR
SAN
MIGUEL
DR
CALLE PORT AD A
PIROPO CT
VIE
N
TO
S
RD
PENZ ANCE AV
BUT T ERCUP L N
VIA D ELCE RRO
MARIA
LN
VENTURA
BL
STU RG IS
RD
M ANSFIELD
LN
L A
SUEN
D R
SA
N
VITO
L N
LEM ON
DR
W HITE ROCK RD
C ORRIENT E C T
BRENT FO RD CT
CAMINITO
MIRAD
O
R
NATALIE W Y
SY C A MO RECOT TA G ECT
NORM A CT
ALTA
VISTA
PL
BEVERLY
DR
LA
PAT ERA
DR
SUDAR IO C T
EL TUACA CT
ALVISO
DR
SOMIS
R
D
CAM IN ITO
PO SADA
CALLE ORINDA
AVEN
IDA
CAFE
GARRIDO
CT
PARADISE
CI
OL D
CO
ACH
D
R
NEISH ST
NANCY ST
LAS
ESTRELLAS
CT
VIA
C
O
N
D
IO
S
AVO
C
A
D
O
PL
COR DOV A
ST
FIESTA D R
MO NT S A LA SCT
BEARDSLEY
RD
C
O
RTE
MO
NARC
A
AVENIDA
AC
AS
O
LA
PAT E RA
CT
CA LLE LO S
AC E IT UNO S
CA M A RIL LOOUT LE T
GUINDA
CT
PL UM B A GO
ST
M EL IA ST
FA IR GRO V E
CI
PASEO
DEL
CAM PO
VISTA DEL CIM A
PR E S ILL A
PL
CASTLETO
N
S
T
BU E NA
VIS TA
DR
CORTE
O
LIVAS
M
ARINE
VIEW
DR
JODY LN
VIA DECANT O
OT E RO
CT
BR
IS
T
E
R
PA
R
K
C
T
TO
W
N
FO
R
E
ST
C
T
CANO PY DR
D
AV
E
N
P
O
R
T
S
T
R
IENTE
ST
FA
IRW
AY
CT
S P RING P A RK R D
RA
M
ONA
D
R
AVO
CA
DO
C
T
VALE
N
C
IA
DR
C OR TE TIARA
COTTA
GES
CT
WICK FO RD P L
PALA
VISTA
VILLAGE
AT THE
PARK
DR
LA S
TUE R O
CT
TABOR
CI
TRUENO
AV
CA M INOLAPO S A DA
SU E NOCT
CAL LADO
ST
CALLE
BRISA
ROS A DACT
VIA
F RESCO
VIA
PAJARO
LOP A COCT
CA LLECO RVA
VA NITA
PL
ALO HA
ST
WAY S IDE
C I
RE TIROCT
H
IG
HLAN
D
H
ILLS
RD
CA LLE
AC OP A DA
CA LLE
ROC A S
AZ A LE A
CT
CAL LE
AUR OR A
TAM ARIX
ST
HYA CINT H
S T
AL
CAMARILLO
DR
BEVERLY
CI
DR
ANACAPA
DR
ENCINO AV
CAR
M
EN
DR
VENT URA BL
VENT URA BL
W. VENT UR A BL
VALL EY VISTA DR
W Y
DA
WS
ON
DR
O
AKS
C
AM
IN
O
R
U
IZ
O
V
E
R
LA
N
D
R
D
FLYNN
RD
FLYN
N
RD
FLYNN
RD
AL
OS
TA
DR
W
AL
K
E
R
A
V
B
RENTLY
AV
M
O
B
IL
A
V
M
O
BIL
AV
LY
ND
H U RST AV
HIG
H
LA
N
D D R
HIGH LA N D DR
ANACAPA
DR
L
A
N
TA
NA
ST
LANTAN
A
S
T
CHAPEL
DR
V IA T E RR AS O L
AV O CA DO P L
PONDEROSA
PONDEROSA
DR
DA ILY DR
DR
Al ley 16
Alle y 20
A
lley
19 A
lle
y
1 8
A
L
1 7
TAHQU IT ZDR
PA
R
K
C
OTTA
G
E
P
L
GA Z E B O L N
AR B OR S T
VILLAGE COMMONS BL
DA ILY DR
DA ILY DR
DAILY
D
R
SP
R
IN
G
O
A
K
R
D
MIRA M A R ST
ADO HR L N
NORT H LO OP DR
EA S T L OO P D R
WE S T LO OP DR
FIRE ST AT IO N
W. VENTURABL
WILLO WGLE N CTB
LO
O
M FIELD
P
L
ELM
C
O
TTAG
E
C
T
BR EEZY DR
D USK DR
SPRINGVILLE
DR
FLYNN
RD
FLYN
N
RD
FLYNN
RD
R
O
W
L
A
N
D
AV
RO WL AND AV
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
TO WNS IT E P RO ME N A DE
5TH
ST
CA LIS TO GA R D
WEST PARK
CT
STERLING
HILLSDR
PONDEROSA
BEDFO
RD
DR
!(
!(!(
!(
!(!( !(
!(
!(
!(!(
!(
!(!( !(
!(
!(
!( !(
!(
!(
!(!( !(!(
!(
!( !(!( !(!( !(!( !(!(
!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !( !( !(!( !( !( !( !(
!(!(
!(!(
!(!(
!( !(!(
!(
!(
!(
!( !(!(
!(!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(
!(
!(
!( !(!(
!(!( !(!( !(!( !(!( !(!( !(!( !( !(!(
!(
!(
!(
!(!( !(
!(!(
!(
!(!(
!(
!(!(
!(
!(!( !( !(
!( !(
!(
!(!( !(
!(!(!(!(!(
!(
!( !(!(
!( !( !(!( !(!(
!(
!(
!(!(
!(!(
!(!(!(
!(
!(
!(!( !(!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(!(!(!(
!(
!(
!(!(
!(
!(!(!(
!(!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(
!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(
!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!( !( !(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(!(!( !(
!(
!(
!(
!(
!(!( !(
!( !(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(!(
!( !(
!(
!( !(
!(!(
!(
!(!(
!(!(
!(!(
!(!(!(!(!(!(!(!(
!(!(
!( !(
!(
!(
!(!(
!(!(
!(!( !(!(
!(!(
!(!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(!( !(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(!(!(!(
!(!(
!(
!(!(
!(!(
!(
!(!(
!(
!( !(
!(
!(
!(
!( !(
!(
!(
!(
!(!(!(!(
!(
!(
!(!(
!(
!(!(!(!(!(
!(!(!(!(!(
!(
!(!(!(!(!(!(
!(!(!(!(!(
!(
!(!( !(!(
!(
!(
!(
!(
!(
!(
!(!(!( !(
!(
!(!(
!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(!(
!(
!(
!(!(
!(!(!(!(!(!(!(
!(!(
!( !(!(!( !(!(
!(
!(!(
!(!(!(!(!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(!(!(
!(!(!(
!( !(!(!( !(!(
!(
!(!(
!(
!(
!(
!(
!( !(
!(!(!(
!(!(
!(!(
!(!(
!(
!(!(!(!(!(!(!(
!(!(!(!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(!(
!(!( !(
!(
!(!(
!(
!(
!(
!(
!( !(
!( !(
!( !(
!( !(
!(!(
!(!(
!( !( !(
!(
!(
!(
!(
!(
!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!( !(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(!(!(!(!( !(!(!(
!(
!(
!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !(!(
!(
!(!(
!(!(
!(!(!(!(
!( !(!(!( !(
!(!(!(!(!(!(!( !(!(!(!( !(
!(
!(!(
!(
!(
!(!(
!(
!(
!(!(!(
!( !(!(
!(
!(
!(
!(
!( !(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(!( !(!(!(
!(
!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(
!( !(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(
!(!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!( !(!(
!(
!(
!( !(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(
!(
!(
!(
!(
!(!(!(!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !( !( !( !( !( !(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!( !(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
329
328
327
326
321
323
325
321
322 214
215
216
218
219
211
213
105
101
101
102
108
107
106
103
104
433
330433
440
440
439
438
432
434
435
436
437
440
440
212
110
431
441
109
101
441
441
441
441
220R
324
104
217
217
220
220
101
105
108
321R
321R
321R
441
442
102
432
¯
Scale: 1" = 2,000'
Prepared by Information Systems Division
THIS MAP WAS CREATED BY THE CITY OF C AMARILLO GEOGRAPHIC INFORMATION SYSTEM, WHICH IS DESIGNED AND OPERATED SOLELY FOR THE CONVENIENCE OF T HE CITY AND RELATED PUBLIC AGEN CIES.
THE CITY DOES NOT WARRANT THE ACCURACY OF TH IS MAP, AND NO DECISION INVOLVING A RISK OF ECONOMIC LOSS OR PHYSICAL INJURY SHOULD BE MADE IN RELIANCE THEREON.
Thursday, February 8, 2024
Document Path: G:\CamarilloGIS\Projects\PublicWorks\WATER\Water Meter Routes\AMR_MeterLocations\Water Meter Routes_Feb2024.mxd Legend
!( AMR Meter Retrofit
AMR Meter Retrofit Areas
Cycle 1
Cycle 2
220R (cycle 2 radio read)
Cycle 3
321R (cycle 3 radio read)321R
Cycle 4
Cycle 4 route 441 & 442
Parcels
220R
City boundary
City of Camarillo
Water Meter AMR Retrofit
C O R T I N A( P V T . )C A M I N O
( P V T. ) LN .
( P V T. ) LN .
( P V T. ) LN .
( P V T. ) LN .
B R I D G E P O R T
O N D A
( P V T . ) D R .
B A N D E R A( P V T . ) D R .
D E L P R A D O
( P V T . ) D R .
E S C O N D I D O
D R .( P V T . )
E S T A N C I A ( P V T. ) P L .
R A N A ( P V T . ) P L.
C O R T E ( P V T. )
D E D E B E S A
PAS E O
VE RD E (P VT. )
ST.
DE SE O
A V E.
VIS TA M O N TA N A (PV T.) S T.( P V T. )
D E M A R E JA D A
C A L L E
CH U C KA R
(PV T.) LN .
O RA N G E ( PV T.)
LN.
ALO S TA ( PV T.)LN.
ALO S TA ( PV T.)
PL.
(PV T.) WY.
PARK
WEST D R ( PVT)
E . E D G E WA T E R
E . D O C K S I D E
E . P I E R S I D E
B
CIR.
H U G H E S ( P V T . ) R D .
( P V T. )
(PVT.) A VE.
HORIZ ON
(PVT.)
A I RPORT WY .
A VE. (PVT.)
DR.
S KYWAYE U B ANKS ST.
(PVT.)
(PVT.)
A VIATI ON DR. ( PVT.)
WILL IS
(PVT.)
DURLEY
8 FREEDO M PARK DR.
CONVAIR ST.
P O ST ( PVT.) ST.
(PVT.) ST.
HOUCK
S T INSO N
(PVT.) ST.
26 P O ST ( PVT.) ST.
(PVT.) ST.
S T EARM AN
JO N N A
C I R .
H E B E R T
D R .
C I R .
H E B E R T ( P V T . ) . D R .
JO N N A ( P V T . )
B R I A N
( P V T . ) C I R .
B R I A N
C I R .
M A L LA T T
WY .
R O B Y N
WY .
S U E
LN .
WI L D O N R D .
LO I S L N .
P
H
E A
S
A
N
T
H
I
L
L
( P
V
T
. )
LN .
( P V T . )
LN .
D E E R
H U N T E R
C A M I N O
( P V T . )
T0 L U C A
C A LL E
LO S G A T O S ( P V T )
( P V T . )
B A J A C T.
B A J A C T.
( P V T . )
V I E J O D R .( P V T . )
C O R O N A D 0 C T .
( P V T . )
LI D O C T .
( P V T . )
( P V T . )
C A P I S T R A N O C T.
M O N T E V I S T A ( P V T. ) D R .
H O LL Y ( P V T. ) D R .
( P V T . ) D R .
D E L
P R A D O
( P V T . ) C T.
JA L I S C O
( P V T . ) D R .
S O N O R A
( P V T . ) C T.
TA X C O
( P V T . ) C T.
D U R A N G O
( P V T . ) D R .
C H A P A LA
V I S TA ( P V T. ) D E L S O L
E L S O N E T O
C T. ( P V T . )
C O R T E
LE JO S ( P V T . )
LO S A LI S O S
C T. ( P V T . )
CALLE
SEG UN DA ( PVT.)
PASE O LO M A (PV T .)
LO S
S A N T O S C T .
TI E R R A
B U E N A
L A VER AD A
(PVT.) C T .
A V E N I D A ( P V T. ) M A G D A L E N A
A R R O Y O ( P V T. )
P A S E O ( P V T. ) D E C O R TA G A
V I S TA ( P V T. ) D E L S O L
D E L V A LL E
C A LL E ( P V T. )
M I R A S O L
D E L M A R
P A S E O
C A LL E( P V T. )
M I G U E L
P A S E O( P V T. )
A R R O Y O
P A S E O ( P V T. ) L U N A R
C A L L E
( P V T . ) C U E S T A
AG UILA
CALLE
(PVT.)
CALLE
ESC OR IAL
(PVT.)
CALLE
DE
L A
RO SA
(PVT.)
(PVT.)
R
O
SAL
VIA
P I C A D O D R .
V I A ( P V T. ) C A N T I L E N A
C A LL E ( P V T. ) A R G O LL A
V I A M E D A N O S
C A LL E O R O V I S TA
P A S E O ( P V T . ) S A B A N E R O
C A LL E
R
A
N
C
H 0
FR O N T E
T
A
H
Q
U
I TZ
D R .
T
A
L
U
D
T
E
R
R
A C E
T R A
N Q
U I L A
TR A N Q U I L LA
C I R .
D R .
R A N C H OA D O L FO
( P V T . ) C T.
C A LE T A
( P V T . )
TA H Q U I TZ
C T.
A D O L FO
( P V T . ) D R .
D R .
C T.
C A LE T A
A
C
A
L
L
E
( P
V
T. )
D E
D E
B E
S A
C O R T E ( P V T. ) D E E N C I N I T A S
C O R T E ( P V T. ) D E Q U I N T E R O
CO R TE
(PV T.)RIV IE RA
CO R TE
(PV T.)
AU G U STA
(P
V
T
.)
A
V
E
N
ID
A
DE AU TL AN
J EWEL (P VT ) CT
S T E R L I N G H I L L S
( P
V T
.)
D R .
AVE N ID A
(P
V
T
.)
D
E
AU TLA N
P
A
T
IN
A
(
P
V
T
.)
C
T
.
TO WE R
( P V T .)C T .
CLU B
(PV T.)
CT.
DIA M O N D
(P
V
T
.)
DR .
D
IA
M
O
ND
(PV T.) DR .
LA P LATA
GO
LF
V IL LA
(PV T.) D R .
(PV T.) W Y.
DE L TIO(PV T.) C T.
M A XIN E
WILDE N
(PV T.)
C A M I LA R
M
L
A
E
S
W
N (PV T)
E
C
TNE
TH O ST (P VT.) D R .
SA NT A
C
R
U
Z
M ISS IO N TR .
( PV T.)
(PV T.)
( PVT.)
PL
.
(PVT.) LN .
(PVT.) D R.
( P V T. )
D R .
Y
.
WY.
G YP SY (P VT.) LN .
ALO S TA
C A M P A N E R O
C A LL E ( P V T. )
LO RI LN . (P VT.)
C O U NT R Y V IE W
PIN O ( PVT. ) C T.
BE LL
(PV T.)
CT.
RE SE D A(PV T.) C T.
RIO
HA TO
(PV T.)
(PV T.)
RD .
HU E RTA
( P V T . )
M O N T O Y A
V I A
M ENT A ( PVT .) L N.
GR AC E (PV T .)
CT.
M AR IS SA
LN.
(PV T)
S A N L E A N D R O
P L A C I TA ( P V T . )
A N TE R O
( P V T. )
S A N
A V E N I D A
S A N R U FI N O( P V T. )
P L A C I TA
S A N D I M A S
( P V T. )
P L A C I TA
( P V T. )
G A R C E S
A V E .
S E M I N A R Y
( P V T . )
R D .
BEL L R AN CH ( PVT .) RD .
OLD SO M IS (PV T .) R D.
C A LE T A ( P V T. ) D R .
C T .
V I LL A M O N T E
V I A M A N TI LL A
( P V T . )
( P V T . )
( P V T . )
R D .
CA M IN O A VE LLA N A
CA LLE S E RR A
VIA AR A N D AN A
VIA SE C O YA
V I A A C I A N D O
LO S D A M A S C O S P L.
LA T UN A C T.
CO R T E A R BU S TO
LA S V E R E D A S P L .
R O M E R O
P L .
M A RR ISA (P VT)
CALLEBRISA
VALER O (P VT) W Y
(PVT)W
Y
RO
SETTA
SANTO
DOM
INGO
(PVT)
WY
(PVT)
CED AR BR OO K
(PVT) WK
(P VT
)DR
.
R O CK H AM PTON
SHA DET REE
(PVT) WY.
L IG H TWO OD (PV T) ST.
I V Y
GA RD EN
(PVT) CT.
GLE NP OST
(PVT) DR.
VIA (PV T .)
P ALOM A
CALLE ( PVT.)
PARA DO R
VIA (PV T .)
L IS BO A
VIA (PV T .)
SINTR A
V I A ( P V T. )
M A R I S M A
V I A ( P V T. )
G A B I LA N
CAM INO (PV T .)
ALGA RVE
CAM IN O ( PVT.)
VALVER DE
CALLE ( PVT.)
VIEJ O
R E FU G IO
CT. (P
VT
)
AUB UR Y (PV T)
PL.
VIA(PVT)
REA LVIA SER EN A
(PVT)
VIA BO NITA
(PVT)VIA
DEL(PVT)SOL
VIA(PVT) PRESIDIO
(PVT) CT.RIVE RD ALE
SUM E RTO N (PVT) CT.
BRO O KSH IRE (PVT) CT
V
IA
RO
SAL
(PV
T)
DURLEY AVE
A VIATI ON DR.
A V I A T I O N D R .
MAIN ST
B O WLI NE BLHIGH ANGL E HWE M ORY L N
PASE O D E LO S PE T A LOS
AVEN IDA DE M A RG AR ITA
VIAALLEGRA
VIAALLEGRA
C
ALLE D
EANEPOLA
POSADA
LILLIA
P
ETA
LO
CIRCULO
JARD IN
ANCHO RS DOWN (PVT ) WAY
ENCINO
(P
VT)D R.
HIG H LA N D
TER R A CE (P V T)
E CA LL E LA G UER RA ( PVT)
CALLE LA GRANADA(PVT)
CALLE
ELC
ONDOR(PVT)
CALLE ELAVION(PVT)
CAMINO
LAM
ADERA(PVT)
C
ALLELA
CUMBRE(PVT)
CALLE
ELHALCON(PVT)CALLELA FIESTA(PVT)
CALLEEL BOSQUECILLO(PVT)
CALLE
LA
GRANADA(PVT)
PASEO GIR ASO
L
DELRAYO CT.
CAM IN O
AVELLAN A
VIA AC IA N D O
YORBA
LIND
A
P
L.
SOBRE(PVT. )COLINAS
PL.
G
ALAN O ( PVT.)DR.
N
OV
INA
(P
VT.)PL.
LAVETA
(
PVT.)DR.
G ALAN O ( PVT.)DR.
PAS EO
ESP LEND IDO
(PV T)
VIA AC OR DE (PVT.)
SAN TA SUS AN A (PVT ) RD
SAG E BR O OK ( PVT) C T
CO LD SP RIN GS
(P VT) C T
SIL V ER SAG E
( PVT) C T
STO NEG ATE (PVT) RD
STAG E TR AIL (PVT ) RD
CAR RIZO C REE K (PV T) RD
NU EZ ST
NU EZ
S
T
CAS TIAN O S T
M A NZA NO ST
RO BLES ST
PION EE R (P VT) S T
PRA IRIE
(PVT)
ST
SAWB UC K
(PVT)
ST
M U STAN G (PVT) ST
T O WN S ITE PR O M E N AD E (P VT )
EA
R
L
JO
SE
P
H
(P
VT
)D
R
SETTLE R
(PVT) ST
C
AM
IN
O
TIER
R
AS
AN
TA
(PV
T)
SAN TIAG O S T
PROM EN ADE DR
TOW N C ENT ER E AST (P VT)
M IA N P LAZA
SER RA (P VT) S T
PED RO (PV T )ST
GA SPAR (PVT) S T
SEBA STIA N
(PVT) ST
VISC AINO
(PVT) S T
SO L A RE S (PV T) S T
M A RTIN A(PVT) STDO M ING UE Z (PV T) ST
K A Y L E E L N
WE S TL A N D
D R
O U T R I D E R LN
D A S H LN
M O R T E R LN
M A R S H A LL D R
WA G N E R LN
M A R LE E LN
R E N D A R L N
B R Y A N T D R
WEST PARK CT (P VT)
M IK E LO ZA D R (PV
T)
ARB OLE DA R D
SAFFR O N C TJOVA
NA
C
T
REX TON D R
S E M I N A R Y
PARK WES T DR (PVT )
PARK WES T DR (PVT )
B L EVE BL
OLD SEM IN ARY (PVT.) R D.
C A M A R I L LO P L A Z A ( P V T . )
PEC
A
NA
S
T
R AN CH O
C
A
M
PAN
A
(PV
T)
EDWA RD SC HO LLE D R (P VT)
EDITH RO U SE D R (P VT)
WELLSP RIN G
ST (PV T)NED CH ATFIELD DR (PV T)
PO ND ERO SA DR
GU Y TU RN ER D R ( PVT)
VIA TIVO LI
CALLE A RM ISTA D
VIA CH ELSE A
CALLE A L TAM IR A
VIA ALM AR
CALLE C AS TILLA
VIA BE ATRIZ
CALLE D E PA LM A
VIA ZIBE LL O
VIA VALLAR TA
CALLE C AM P ESIN A
CALLE D EA RIBO
VIA CO R T A
CALLE A RO M ITAS
VIA HE RM O SA
R
U
B
IO
AV
EUCLID
AV
AL LEY 8
A L LEY 10
BENT
TW
IG
AV
BA
JA
V
IS
TA
W
Y
W
E
S
T
O
N
C
I
COR TE
EST RELLA
C
ALLE
SUERTE
B
U
EN
O
S
TEM POS
DR
W
O
LV
E
R
TO
N
A
V
RAEM ERE ST
SENAN
ST
AL B ORA D A D R
CORTE ELEGANTE
GRA H AM A V
CO M A N C
HE
CT
D
A
W
SO
N
D
R
O
B
R
IE
N
C I
S
IE
RR
A
M
A
D
R
E
D
R
RO
SEW
O
O
D
AV
AL LEY 1
VIA PESC ADO R
BEECHWOOD
ST
PLA
Z
A
D
E
L
R
A
N
C
H
O
CO RTE
CABALLO S
S
PAR
KM
AN
AV
CO RT E SOL
SKEEL
DR
C
A
LLE
M
A
D
U
RO
CHARTER
O
AK
D
R
FO UNT AIN
GO LDEN
AVENID
A
DE
APRISA
HUNT
CI
O LIVO C T
CALAM
AR
CT
PA
SEO
M
ARAVILLA
ALTA
COLINA
RD
H EDGE LN
VIS
TA
P
ALACIO
RANCHO
CALLEGUAS
FEN
MOR
E
A
VVIA
ARACENA
V
IA
OLIV
ERA
GRANDVIEW
CI
BROO
KHILL
DR
AL M E NDRO W Y
MESQUITE
ST
CALLE
PORT IL LA
SHARON
D
R
K
E
N
N
E
T
H
S
T
D
AR
A
S
T
CALAVERAS
DR
R
O
W
LA
N
D
A
V
DWIG HT
A V
CO RBY
AV
A
G
U
S
TA
AV
RE GE NT S T
AN
A
C
A
PA
D
R
MU
RRAY
AV
E L C ORT IJO
P L
CO
RTE
O
LIV
AS
BO
R
D
E
A
U
X
AV
C
A
LL
E
CIRCU LO
BR
O
OKH
AVEN
AV
AVENIDA
GAVIOTA
LYNDHUR
ST
AV
BAYW
OO
D
AV
VIA CU PERT INO
GLENN
D
R
WAVERLY
AV
VIA
M
AR
QUESA
CAMINO
LA
MADERA
DEW
AYNE
AV
VIA
ALONDRA
K
E
N
D
A
L
L
A
V
CALLE
C
ITA
LA
N
TA
N
A
S
T
MODESTO
AV
CRO YDON
AV
EAST PAR K
ABBO
TT
AV
D
UR
K
IN
S
T
G
EM
IN
I
AV
VALLE
LIND
O
DR
GRACIA
ST
MARCO
DR
W
A
LK
E
R
AV
CAMINO
T IERRA
SANTA
ALIENTO
WY
AVEN
ID
A
V
ALEN
CIA
L
A
K
ESID
E
A
V
SHEPHERD DR
VIA
PACHECO
APPLETREE
A
V
EL CAPITANPL
CO LO NIA PL
ALL EY
9 CR EST VIEW AV
F
ULTON
ST
B
R
A
D
F
O
R
D
AV
DEL N OR TE
RD
CO RT E LA CIENAGA
VISTA DEL
MAR
AV
N
O
R
D
M
A
N
DR
W
V
E
N
T
U
R
A
B
L
CALLE LARIOS
VIA
ZA
M
O
RA
C
A
L
LE
S
AN
PABLO
CO
NSTITUTION
AV
CALLE
E
S
CA
LO
N
B
E
LD
E
N
AV
PARK N
RIDE BL
VERDUGO
WY
VIA
TERRAD O
CA LLE CA RG A
ALL EY 6
AVO
CAD
O
PL
M C CULL OC H ST
L ONSD ALE ST
SHERBO RNE ST
FAR NWO RT H ST
DER BY ST
SH ALIMAR ST
G OR M AN ST
W IL CO X ST
C ANO GA
PL
S
E
Y
B
O
LT
AV
S
O
U
T
H
FIE
L
D
R
D
PAR RON
S
T
C
A
R
T
A
G
E
N
A
S
T
AL LE Y
RIPL EY ST
BEAR
D
SLEY
RD
SH OR EL IN E ST
SA
N
C
H
E
Z
D
R
B
E
N
IT
O
D
R
M
A
R
K
ER
AV
C
IPR
IAN
AV
ROM
AN
AV
CO RTE REG ALO
SEREN O
PL
M
AR
VISTA
DR
T RUM AN ST
PICKW IC K DR
FARIA
ST
W. VENT URA BL
CAM
B
O
N
A
V
ACA
CIA
ST
CALLE
CONVERSE
LA
MARINA
D R
EN CINO AV
E
M
P
R
E
S
S
AV
DUV AL L AV
CO RT E M ALPASO
KIM BERLY AV
FIESTA DR
CAM
ARILLO
RAN
CH
R
D
MAYA
LINDA
LEATHERW OOD ST
CALLE
TESORO
G
E
N
E
IV
E
S
T
TIFFA
NY
C
T
DORM AN
ST
MILPAS
ST
REDDINGTON
CT
PONDEROSA
DR
SANTO
DO
M
IN
G
O
CAL LE ALT O
C
A
LLE
C
A
M
E
LLIA
MERCED DR
ALTA
SAGU
NA
CT
BANCRO F T ST
G RANG ER ST
VISTA
MERCADO
JA
Y
AV
C
A
L
LE
P
LA
NO
LA
CULEBRA C
I
B
A
R
TO
N
A
V
SP A NIS H M O S S
PL
PARKHILL
CT
VIA
VELA
C
A
L
LE
LA
R
O
C
H
A
LATH
AN
AV
A
CALA
ST
CALLE
ALBERCA
FAYTON
CT
LEVEN
AV
C
A
L
LE
L
A
P
R
A
D
A
HERRO
N
CT
HA CIE NDA DR
CORT E
PA S TO RA L
FIELDGATE
DR
VA
LLE
Y
VISTA
DR
M
ARDIGR
AS
CT
DARN ELL CT
ALGONQU
IN
C
T
LEAFW
OO
D
D
R
CABRILLO
MESA CT
D EERFIELD CT
BALM OR AL C T
PE P P E RW OO D
DR
D
O
MIN
ICA
C
TE
AVIADO
R
ST
BOG ART ST
FA
IR
C
H
ILD
AV
CAMARILLO
CENT ER
DR
CORT E
VIE NT O
G
LENBROO
K
AV
GREEN VALE
DR
TA NGL E WO OD
DR
HUG HES DR
RID DE N S T
GRE E N
GLA D E
CT
CORT E
AG UA CA T E
CORT E
GO LO NDRINA
CORT E
COL IN A
K
E
LLE
Y
AV
NELLOR
A
ST
FO
RAR
CI
ALLEY
4 ALLEY
2 CORT E
CA S TA NO
BRAM BLE CT
CHRIST INA
C T
CALLE
NAVARRO
M ARIANO
ST
C
A
M
B
R
IA
CT
AVENIDA
ACASO
H
E
DO
N
CI
ALLEY
15 CHU LA
VISTA
C
T
CA M INO
RA NCHE R O
SA N TA A N ITA
CT
W
OO
D
R
D
VIA
LEAL
CAMIN
O
ESTRAD
A
YE A R LIN G
CT
HELMA CT
BIG HO RN
CT
R O YCE CT
PL A ZA LA
VIS TA
CALABRIA
CT
WO ODG A TE
CR
BARCA ST
SUN
ER
C
I
TRE E FE RN
CT
OR CH AR
D
VIEW
PINE H URS T
PL
CREST VIEW AV
VIA
AL CA ZA R
AL OHA
ST
VIA DE LSU E LO
CORTE
TU
LA
ROSA
CORT E
VINA
DE X TE R
ST
SEQUAN CT
EL NIDO
ST
TIE RRA
LIN DA
CT
P
AS
E
O
C
A
S
T
ILLE
C IPR ES CT
HABR A CT
PR IM A C T
CA S TA NO DR
CAM INO VE
RA
CRUZ
VANGUARD
DR
TEJO N C T
ST O NE -ME A D OWCT
PL AT E A U
CT
VIKING
DR
CA
MINO
ALVAREZ
OA K HUR S T
CT
W
ESTW
OO
D
DR
VERD ULERA ST
DAW S O N
PL
PARKWAY
DR
JU
LIA
C
T
CA NT ER
AV
DA P P LE
AV
FACTO
R
Y
S
TO
RES
D
R
H
ARRIS
AV
SE R A PE
PL
PA S E O
YO LO
ALL EY 13
CORT E R OS A LINDA
LE AT HE R-
WO OD
CT
CA
MEO
CT
A
S
H
B
U
RY
C
T
DAPHNE ST
CALLE MA
PAC
H
E
CO RT E
FRONDOSA
C LA
YTO
N
CT
HOBART
DR
CREST VIEW AV
KIN O ST
BEVERLY
DR
C
E
R
R
O
V
IS
TA
W
Y
A L LEY
12 SIERRA
MESA
DR
BO LLIN
AV
MA N DA LA Y
CT
R ED O AK PL
KARENACT
BRIARF IELD ST
ESTON
ST
BE T T INA
CT
M ILBURN ST
A
V
EN
ID
A
S
O
LT
U
R
A
CO E
ST M
IL
LIG
A
N
D
R
CORTEFRESCA
BERW ICK ST
BLUE
OAK
ST
LANDEN
ST
VIA
LA
SILVA
CRANBRO OK
ST
SP
IN
D
LE
W
O
O
D
AV
CA LLE T E CA TE
M ESA
DR
LA
UREL
PARK
CI
RIVERM O RE
ST
GRAN DVIEW
DR
F RANC IS AV
S
TA
U
N
T
O
N
S
T
CORT E
CORRIDA
PL
ASHBURY C T
CASTANO
ST
F
A
LLEN
LE
A
F
AV
RIDG E
VIEW ST
P
IC
K
E
T
AV
BRON SON ST
EL
R
ANC
HO
D
R
CAL
LE
T
IE
R
R
A
VISTA
W ENDELL ST
FO RTUN A
AV
L EONAR D
S
T
PO G GI
ST
JA
P
O
N
IC
A
AV
P
A
LM
E
R
A
V
KLAM
ATH
DR
ID A ST
S
W
E
E
T
W
AT
E
R
AV
SU NGR OVE DR
STILES
AV
VIA DEL NOG AL
LA
K
E
H
U
R
ST
AV
S
ATUR
N
S
T
SHIRLEY ST
DUM ET Z ST
SP IND LE -
WO OD
CT
CALLE
CANCUN
RAM ONA
DR
PE O P LE S
AV
VIA
TO
M
AS
G ENEIVE
CI
WINDS O R
CT
A Q UA
V ER DE
CT
CU RT
DR
AILEEN ST
NE WQ UIS T
CT
HACIENDA
CI
VISTA
COTO
VERDE
SOR REL ST
CHE LS E Y
CT
DEERH URST
AV
A N GUIL A PL
VIA
CALDERO N
VINCENTE
AV
G
R
E
E
N
L
AW
N
AV
A L M ENDROCT
LADERA
VISTA
DR
CALLE COVINA
MISSION
LEW
IS
RD
PLEASANT
VALLEY RD
PLEASANT
VALLEY
RD
CENTER
SC
HO
O
L
R
D
CENTRALAV
FAIRW
AY
DR
ADOLFO
RD
TEM
PLE
AV
VALLEY
VISTA
DR
ADOLFO
RD
LA
S
PO
SAS
R
D
CA
RM
EN
DR
A
RNEILL
R
D
SANTA
RO
SA
RD
LAS
POSAS
RD
SOMIS
RD
LEWIS RD
LEWIS
RD
PLEASANT VALLEY RD
ELNIDOCT
STONETREE AV
EU CLID A V
ELM
DR
PALM
DR
JAPONIC A
CT
PASEO
M
ONTELENA
CALL E
MEND OTA
JO
S
E
AV
LUCEROC T
L
E
X
IN
G
T
O
N
C
T
PANCHO
RD
CEBOLL A D R
CO RONA
ST
SAN YS
IDR
O
S
T
CAM INO
ESPLENDID O
CALLE
HIGUERA
SA U S AL IT O
DR
CO LONY
DR
CORTE BARROSO
O RENA
CT
C
A
LL
E
LA
PA
L
M
ER
A
EX E T E R
CT
CALLE
L
A
R
O
D
A
AVENIDA
DEL
M ANZ ANO
GE T M AN S T
O
AK
ST
M
E
R
R
IT
T
A
V
FIR S T
CALL E LA
SO M BRA
H
ILLC
R
E
S
T
DR
APPLET REE
CT
ALTA
VISTA
PL
DU NNIGAN ST
SU NRIS E
CT
LU
NA
DR
BREACTC
A
LL
E
B
E
LL
A
V
ISTA
FENM OR E
CT
ELM A
ST
AS H DA LE
CT
M AGN OL IA ST
CALL E
LA G UERR A
EDGEM ONT D R
V I A
JACARA
CALL E
A R GO LLA
BAR RY ST
LO MITA ST
CALLE
LA
C
UM
B
R
E
PL A CITA
BU E NA
ROS A
B
IS
C
AY
N
E
AV
RO CKLYN
ST
APPIAN
VIS TA
CI
LOS NO GAL ES ST
V ET ERANS
WY
ANT ONIO
AV
MA Y B RO OKAV
SELBY CI
DANBROO K
AV
ALLEY
3 CHE RO K E E
CT
PASEO
BAR
O
NA
HAR TNEL L
ST
CALLEVISTA
B ED FO RD
CT
VIA
CORZ A
C
E
N
TE
N
N
IA
L
A
V
BELAIR
CT
AM BER
DR
GER M AIN ST
CORT E
CE RRITO
W
EST
LOOP
DR
A L LEY 11
ASCOT PL
B E LM ON T A V
M
O
B
IL
AV
LUCERO
ST
TEMPLE
AV
LOR E TA
CT
GRA V E S
CT
LO
M
A
D
R
TAM AR IX
ST
KN IG HT
RON DO
BURNL EY ST
B
R
IARF IELD
ST
G ARDENIA
AV
C HAPEL DR
B
A
R
C
E
LO
N
A
S
T
BA Y WO O D
CT
M
ORENO
DR
HAY DE N S T
CO
TTAG
E
G
R
O
V
E
A
V
FLO
R
A
V
IS
T
A
A
V
LEM ON
DR
K EYSERROND O
MCL EOD
ROND O MARSHROND O
M UN SON
S
T
GE M INI CT
IS LACT
CORT E
TE LA
DELG ADA CT
G
R
A
N
A
D
A
S
T
CORT E
OLM O
EL CARAZ O N CT
YOLAN DA
ST
JAPONIC A
P L
DWIG HT
CT
DWIG HT
CT
PASEO
CAM ARILLO
DWIG HT
AV
M
ISSIO
N
DR
S
TO
N
E
M
E
A
D
O
W
D
R
CORT E
AZ A L
CORT E
A M IG OS
VIS TACT
IR OQ UO IS CT
APACHE CT
SA B E T
CT
CH APEL D R
SEVILLA ST
WAVERLY CT
VENT URA BL
CAM
INO
CASTENADA
EARL
JO
SEPH
DR
CEDAR
DR
CAM
ARILLO
ST
BRENTLY
AV
ALLEY
5 CHAN DLER ST
PLEASANT VALLEY RD
TRELLIS
PL
BRIDGEH AM PTO N WY
VIA RO SAL
BE
LLAFONTECT
BRIDGETO NWY
PO ND DR
BRID GEHAM PTO N W Y
B
R
ID
G
E
H
A
M
P
TO
N
W
Y
ST
PETIT ST
B
R
IARF IELD
ST
GRADA
AV
DEL
CIERVO
PL
LA
PUMA CT
DESEO
AV
CA M INIT O
LUIS A
ESTABAN
D R
CA B R ILLOW
Y
TW
IL
IG
H
T
C
T
C
ER
R
O
C
REST
G
ARRID
DR
LA CRESCENTA
DR
TRELLIS
PL
ALTAMONT W Y
CALLE
DEL
N
O
R
TE
R
A
M
O
NA
PL
G
ARD
ENIA
AV
VIA
V
EN
E
T
O
TIVERT O N DR
M
AR
SALA
W
Y
VIA
DULCE
CALLE
DESCANSO
AV
ENID
A
NAV
IDAD
PADRE
LN
MESA
DR
F AIRWAY
DR
VIA
SECOYA
C
O
M
M
ON
S
PARK
DR
LA
N
TA
N
A
S
T
G
OLD
ENSPUR
D
R
CAM IN O C O NCORDIA
LOM A DR
C
E
LE
ST
IA
L
P
L
VA LLEY VISTA DR
A
LO
STA
DR
VISTA
DE
L
CAMPO
MISSIO N
DR
H
IG
HLAND
DR
LAS
PO
SAS
R
D
AVOCADO
PL
WRIGHT
RD
O
C
E
AN
VIEW
DR
CATA
LIN
A
DR
SAN
MIGUEL
DR
CALLE PORT AD A
PIROPO CT
VIE
N
TO
S
RD
PENZ ANCE AV
BUT T ERCUP L N
VIA D ELCE RRO
MARIA
LN
VENTURA
BL
STU RG IS
RD
M ANSFIELD
LN
L A
SUEN
D R
SA
N
VITO
L N
LEM ON
DR
W HITE ROCK RD
C ORRIENT E C T
BRENT FO RD CT
CAMINITO
MIRAD
O
R
NATALIE W Y
SY C A MO RECOT TA G ECT
NORM A CT
ALTA
VISTA
PL
BEVERLY
DR
LA
PAT ERA
DR
SUDAR IO C T
EL TUACA CT
ALVISO
DR
SOMIS
R
D
CAM IN ITO
PO SADA
CALLE ORINDA
AVEN
IDA
CAFE
GARRIDO
CT
PARADISE
CI
OL D
CO
ACH
D
R
NEISH ST
NANCY ST
LAS
ESTRELLAS
CT
VIA
C
O
N
D
IO
S
AVO
C
A
D
O
PL
COR DOV A
ST
FIESTA D R
MO NT S A LA SCT
BEARDSLEY
RD
C
O
RTE
MO
NARC
A
AVENIDA
AC
AS
O
LA
PAT E RA
CT
CA LLE LO S
AC E IT UNO S
CA M A RIL LOOUT LE T
GUINDA
CT
PL UM B A GO
ST
M EL IA ST
FA IR GRO V E
CI
PASEO
DEL
CAM PO
VISTA DEL CIM A
PR E S ILL A
PL
CASTLETO
N
S
T
BU E NA
VIS TA
DR
CORTE
O
LIVAS
M
ARINE
VIEW
DR
JODY LN
VIA DECANT O
OT E RO
CT
BR
IS
T
E
R
PA
R
K
C
T
TO
W
N
FO
R
E
ST
C
T
CANO PY DR
D
AV
E
N
P
O
R
T
S
T
R
IENTE
ST
FA
IRW
AY
CT
S P RING P A RK R D
RA
M
ONA
D
R
AVO
CA
DO
C
T
VALE
N
C
IA
DR
C OR TE TIARA
COTTA
GES
CT
WICK FO RD P L
PALA
VISTA
VILLAGE
AT THE
PARK
DR
LA S
TUE R O
CT
TABOR
CI
TRUENO
AV
CA M INOLAPO S A DA
SU E NOCT
CAL LADO
ST
CALLE
BRISA
ROS A DACT
VIA
F RESCO
VIA
PAJARO
LOP A COCT
CA LLECO RVA
VA NITA
PL
ALO HA
ST
WAY S IDE
C I
RE TIROCT
H
IG
HLAN
D
H
ILLS
RD
CA LLE
AC OP A DA
CA LLE
ROC A S
AZ A LE A
CT
CAL LE
AUR OR A
TAM ARIX
ST
HYA CINT H
S T
AL
CAMARILLO
DR
BEVERLY
CI
DR
ANACAPA
DR
ENCINO AV
CAR
M
EN
DR
VENT URA BL
VENT URA BL
W. VENT UR A BL
VALL EY VISTA DR
W Y
DA
WS
ON
DR
O
AKS
C
AM
IN
O
R
U
IZ
O
V
E
R
LA
N
D
R
D
FLYNN
RD
FLYN
N
RD
FLYNN
RD
AL
OS
TA
DR
W
AL
K
E
R
A
V
B
RENTLY
AV
M
O
B
IL
A
V
M
O
BIL
AV
LY
ND
H U RST AV
HIG
H
LA
N
D D R
HIGH LA N D DR
ANACAPA
DR
L
A
N
TA
NA
ST
LANTAN
A
S
T
CHAPEL
DR
V IA T E RR AS O L
AV O CA DO P L
PONDEROSA
PONDEROSA
DR
DA ILY DR
DR
Al ley 16
Alle y 20
A
lley
19 A
lle
y
1 8
A
L
1 7
TAHQU IT ZDR
PA
R
K
C
OTTA
G
E
P
L
GA Z E B O L N
AR B OR S T
VILLAGE COMMONS BL
DA ILY DR
DA ILY DR
DAILY
D
R
SP
R
IN
G
O
A
K
R
D
MIRA M A R ST
ADO HR L N
NORT H LO OP DR
EA S T L OO P D R
WE S T LO OP DR
FIRE ST AT IO N
W. VENTURABL
WILLO WGLE N CTB
LO
O
M FIELD
P
L
ELM
C
O
TTAG
E
C
T
BR EEZY DR
D USK DR
SPRINGVILLE
DR
FLYNN
RD
FLYN
N
RD
FLYNN
RD
R
O
W
L
A
N
D
AV
RO WL AND AV
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
TO WNS IT E P RO ME N A DE
5TH
ST
CA LIS TO GA R D
WEST PARK
CT
STERLING
HILLSDR
PONDEROSA
BEDFO
RD
DR
!(
!(!(
!(
!(!( !(
!(
!(
!(!(
!(
!(!( !(
!(
!(
!( !(
!(
!(
!(!( !(!(
!(
!( !(!( !(!( !(!( !(!(
!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !( !( !(!( !( !( !( !(
!(!(
!(!(
!(!(
!( !(!(
!(
!(
!(
!( !(!(
!(!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(
!(
!(
!( !(!(
!(!( !(!( !(!( !(!( !(!( !(!( !( !(!(
!(
!(
!(
!(!( !(
!(!(
!(
!(!(
!(
!(!(
!(
!(!( !( !(
!( !(
!(
!(!( !(
!(!(!(!(!(
!(
!( !(!(
!( !( !(!( !(!(
!(
!(
!(!(
!(!(
!(!(!(
!(
!(
!(!( !(!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(!(!(!(
!(
!(
!(!(
!(
!(!(!(
!(!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(
!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(
!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!( !( !(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(!(!( !(
!(
!(
!(
!(
!(!( !(
!( !(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(!(
!( !(
!(
!( !(
!(!(
!(
!(!(
!(!(
!(!(
!(!(!(!(!(!(!(!(
!(!(
!( !(
!(
!(
!(!(
!(!(
!(!( !(!(
!(!(
!(!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(!( !(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(!(!(!(
!(!(
!(
!(!(
!(!(
!(
!(!(
!(
!( !(
!(
!(
!(
!( !(
!(
!(
!(
!(!(!(!(
!(
!(
!(!(
!(
!(!(!(!(!(
!(!(!(!(!(
!(
!(!(!(!(!(!(
!(!(!(!(!(
!(
!(!( !(!(
!(
!(
!(
!(
!(
!(
!(!(!( !(
!(
!(!(
!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(!(
!(
!(
!(!(
!(!(!(!(!(!(!(
!(!(
!( !(!(!( !(!(
!(
!(!(
!(!(!(!(!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(!(!(
!(!(!(
!( !(!(!( !(!(
!(
!(!(
!(
!(
!(
!(
!( !(
!(!(!(
!(!(
!(!(
!(!(
!(
!(!(!(!(!(!(!(
!(!(!(!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(!(
!(!( !(
!(
!(!(
!(
!(
!(
!(
!( !(
!( !(
!( !(
!( !(
!(!(
!(!(
!( !( !(
!(
!(
!(
!(
!(
!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!( !(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(!(!(!(!( !(!(!(
!(
!(
!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !(!(
!(
!(!(
!(!(
!(!(!(!(
!( !(!(!( !(
!(!(!(!(!(!(!( !(!(!(!( !(
!(
!(!(
!(
!(
!(!(
!(
!(
!(!(!(
!( !(!(
!(
!(
!(
!(
!( !(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(!( !(!(!(
!(
!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(
!( !(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(
!(!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!( !(!(
!(
!(
!( !(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(
!(
!(
!(
!(
!(!(!(!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !( !( !( !( !( !(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!( !(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
329
328
327
326
321
323
325
321
322 214
215
216
218
219
211
213
105
101
101
102
108
107
106
103
104
433
330433
440
440
439
438
432
434
435
436
437
440
440
212
110
431
441
109
101
441
441
441
441
220R
324
104
217
217
220
220
101
105
108
321R
321R
321R
441
442
102
432
¯
Scale: 1" = 2,000'
Prepared by Information Systems Division
THIS MAP WAS CREATED BY THE CITY OF C AMARILLO GEOGRAPHIC INFORMATION SYSTEM, WHICH IS DESIGNED AND OPERATED SOLELY FOR THE CONVENIENCE OF T HE CITY AND RELATED PUBLIC AGEN CIES.
THE CITY DOES NOT WARRANT THE ACCURACY OF TH IS MAP, AND NO DECISION INVOLVING A RISK OF ECONOMIC LOSS OR PHYSICAL INJURY SHOULD BE MADE IN RELIANCE THEREON.
Thursday, February 8, 2024
Document Path: G:\CamarilloGIS\Projects\PublicWorks\WATER\Water Meter Routes\AMR_MeterLocations\Water Meter Routes_Feb2024.mxd Legend
!( AMR Meter Retrofit
AMR Meter Retrofit Areas
Cycle 1
Cycle 2
220R (cycle 2 radio read)
Cycle 3
321R (cycle 3 radio read)321R
Cycle 4
Cycle 4 route 441 & 442
Parcels
220R
City boundary
City of Camarillo
Water Meter AMI - YEAR 1
YEAR 1 - REPLACEMENT SCHEDULE:
1. Retrofit all AMR meters
2. Replace all 1" Meters in the City
3. Replace 3/4" meters in Cycles 1, 2, and 4
- Indicates 3/4 meters to be
replaced in Year 2
C O R T I N A( P V T . )C A M I N O
( P V T. ) LN .
( P V T. ) LN .
( P V T. ) LN .
( P V T. ) LN .
B R I D G E P O R T
O N D A
( P V T . ) D R .
B A N D E R A( P V T . ) D R .
D E L P R A D O
( P V T . ) D R .
E S C O N D I D O
D R .( P V T . )
E S T A N C I A ( P V T. ) P L .
R A N A ( P V T . ) P L.
C O R T E ( P V T. )
D E D E B E S A
PAS E O
VE RD E (P VT. )
ST.
DE SE O
A V E.
VIS TA M O N TA N A (PV T.) S T.( P V T. )
D E M A R E JA D A
C A L L E
CH U C KA R
(PV T.) LN .
O RA N G E ( PV T.)
LN.
ALO S TA ( PV T.)LN.
ALO S TA ( PV T.)
PL.
(PV T.) WY.
PARK
WEST D R ( PVT)
E . E D G E WA T E R
E . D O C K S I D E
E . P I E R S I D E
B
CIR.
H U G H E S ( P V T . ) R D .
( P V T. )
(PVT.) A VE.
HORIZ ON
(PVT.)
A I RPORT WY .
A VE. (PVT.)
DR.
S KYWAYE U B ANKS ST.
(PVT.)
(PVT.)
A VIATI ON DR. ( PVT.)
WILL IS
(PVT.)
DURLEY
8 FREEDO M PARK DR.
CONVAIR ST.
P O ST ( PVT.) ST.
(PVT.) ST.
HOUCK
S T INSO N
(PVT.) ST.
26 P O ST ( PVT.) ST.
(PVT.) ST.
S T EARM AN
JO N N A
C I R .
H E B E R T
D R .
C I R .
H E B E R T ( P V T . ) . D R .
JO N N A ( P V T . )
B R I A N
( P V T . ) C I R .
B R I A N
C I R .
M A L LA T T
WY .
R O B Y N
WY .
S U E
LN .
WI L D O N R D .
LO I S L N .
P
H
E A
S
A
N
T
H
I
L
L
( P
V
T
. )
LN .
( P V T . )
LN .
D E E R
H U N T E R
C A M I N O
( P V T . )
T0 L U C A
C A LL E
LO S G A T O S ( P V T )
( P V T . )
B A J A C T.
B A J A C T.
( P V T . )
V I E J O D R .( P V T . )
C O R O N A D 0 C T .
( P V T . )
LI D O C T .
( P V T . )
( P V T . )
C A P I S T R A N O C T.
M O N T E V I S T A ( P V T. ) D R .
H O LL Y ( P V T. ) D R .
( P V T . ) D R .
D E L
P R A D O
( P V T . ) C T.
JA L I S C O
( P V T . ) D R .
S O N O R A
( P V T . ) C T.
TA X C O
( P V T . ) C T.
D U R A N G O
( P V T . ) D R .
C H A P A LA
V I S TA ( P V T. ) D E L S O L
E L S O N E T O
C T. ( P V T . )
C O R T E
LE JO S ( P V T . )
LO S A LI S O S
C T. ( P V T . )
CALLE
SEG UN DA ( PVT.)
PASE O LO M A (PV T .)
LO S
S A N T O S C T .
TI E R R A
B U E N A
L A VER AD A
(PVT.) C T .
A V E N I D A ( P V T. ) M A G D A L E N A
A R R O Y O ( P V T. )
P A S E O ( P V T. ) D E C O R TA G A
V I S TA ( P V T. ) D E L S O L
D E L V A LL E
C A LL E ( P V T. )
M I R A S O L
D E L M A R
P A S E O
C A LL E( P V T. )
M I G U E L
P A S E O( P V T. )
A R R O Y O
P A S E O ( P V T. ) L U N A R
C A L L E
( P V T . ) C U E S T A
AG UILA
CALLE
(PVT.)
CALLE
ESC OR IAL
(PVT.)
CALLE
DE
L A
RO SA
(PVT.)
(PVT.)
R
O
SAL
VIA
P I C A D O D R .
V I A ( P V T. ) C A N T I L E N A
C A LL E ( P V T. ) A R G O LL A
V I A M E D A N O S
C A LL E O R O V I S TA
P A S E O ( P V T . ) S A B A N E R O
C A LL E
R
A
N
C
H 0
FR O N T E
T
A
H
Q
U
I TZ
D R .
T
A
L
U
D
T
E
R
R
A C E
T R A
N Q
U I L A
TR A N Q U I L LA
C I R .
D R .
R A N C H OA D O L FO
( P V T . ) C T.
C A LE T A
( P V T . )
TA H Q U I TZ
C T.
A D O L FO
( P V T . ) D R .
D R .
C T.
C A LE T A
A
C
A
L
L
E
( P
V
T. )
D E
D E
B E
S A
C O R T E ( P V T. ) D E E N C I N I T A S
C O R T E ( P V T. ) D E Q U I N T E R O
CO R TE
(PV T.)RIV IE RA
CO R TE
(PV T.)
AU G U STA
(P
V
T
.)
A
V
E
N
ID
A
DE AU TL AN
J EWEL (P VT ) CT
S T E R L I N G H I L L S
( P
V T
.)
D R .
AVE N ID A
(P
V
T
.)
D
E
AU TLA N
P
A
T
IN
A
(
P
V
T
.)
C
T
.
TO WE R
( P V T .)C T .
CLU B
(PV T.)
CT.
DIA M O N D
(P
V
T
.)
DR .
D
IA
M
O
ND
(PV T.) DR .
LA P LATA
GO
LF
V IL LA
(PV T.) D R .
(PV T.) W Y.
DE L TIO(PV T.) C T.
M A XIN E
WILDE N
(PV T.)
C A M I LA R
M
L
A
E
S
W
N (PV T)
E
C
TNE
TH O ST (P VT.) D R .
SA NT A
C
R
U
Z
M ISS IO N TR .
( PV T.)
(PV T.)
( PVT.)
PL
.
(PVT.) LN .
(PVT.) D R.
( P V T. )
D R .
Y
.
WY.
G YP SY (P VT.) LN .
ALO S TA
C A M P A N E R O
C A LL E ( P V T. )
LO RI LN . (P VT.)
C O U NT R Y V IE W
PIN O ( PVT. ) C T.
BE LL
(PV T.)
CT.
RE SE D A(PV T.) C T.
RIO
HA TO
(PV T.)
(PV T.)
RD .
HU E RTA
( P V T . )
M O N T O Y A
V I A
M ENT A ( PVT .) L N.
GR AC E (PV T .)
CT.
M AR IS SA
LN.
(PV T)
S A N L E A N D R O
P L A C I TA ( P V T . )
A N TE R O
( P V T. )
S A N
A V E N I D A
S A N R U FI N O( P V T. )
P L A C I TA
S A N D I M A S
( P V T. )
P L A C I TA
( P V T. )
G A R C E S
A V E .
S E M I N A R Y
( P V T . )
R D .
BEL L R AN CH ( PVT .) RD .
OLD SO M IS (PV T .) R D.
C A LE T A ( P V T. ) D R .
C T .
V I LL A M O N T E
V I A M A N TI LL A
( P V T . )
( P V T . )
( P V T . )
R D .
CA M IN O A VE LLA N A
CA LLE S E RR A
VIA AR A N D AN A
VIA SE C O YA
V I A A C I A N D O
LO S D A M A S C O S P L.
LA T UN A C T.
CO R T E A R BU S TO
LA S V E R E D A S P L .
R O M E R O
P L .
M A RR ISA (P VT)
CALLEBRISA
VALER O (P VT) W Y
(PVT)W
Y
RO
SETTA
SANTO
DOM
INGO
(PVT)
WY
(PVT)
CED AR BR OO K
(PVT) WK
(P VT
)DR
.
R O CK H AM PTON
SHA DET REE
(PVT) WY.
L IG H TWO OD (PV T) ST.
I V Y
GA RD EN
(PVT) CT.
GLE NP OST
(PVT) DR.
VIA (PV T .)
P ALOM A
CALLE ( PVT.)
PARA DO R
VIA (PV T .)
L IS BO A
VIA (PV T .)
SINTR A
V I A ( P V T. )
M A R I S M A
V I A ( P V T. )
G A B I LA N
CAM INO (PV T .)
ALGA RVE
CAM IN O ( PVT.)
VALVER DE
CALLE ( PVT.)
VIEJ O
R E FU G IO
CT. (P
VT
)
AUB UR Y (PV T)
PL.
VIA(PVT)
REA LVIA SER EN A
(PVT)
VIA BO NITA
(PVT)VIA
DEL(PVT)SOL
VIA(PVT) PRESIDIO
(PVT) CT.RIVE RD ALE
SUM E RTO N (PVT) CT.
BRO O KSH IRE (PVT) CT
V
IA
RO
SAL
(PV
T)
DURLEY AVE
A VIATI ON DR.
A V I A T I O N D R .
MAIN ST
B O WLI NE BLHIGH ANGL E HWE M ORY L N
PASE O D E LO S PE T A LOS
AVEN IDA DE M A RG AR ITA
VIAALLEGRA
VIAALLEGRA
C
ALLE D
EANEPOLA
POSADA
LILLIA
P
ETA
LO
CIRCULO
JARD IN
ANCHO RS DOWN (PVT ) WAY
ENCINO
(P
VT)D R.
HIG H LA N D
TER R A CE (P V T)
E CA LL E LA G UER RA ( PVT)
CALLE LA GRANADA(PVT)
CALLE
ELC
ONDOR(PVT)
CALLE ELAVION(PVT)
CAMINO
LAM
ADERA(PVT)
C
ALLELA
CUMBRE(PVT)
CALLE
ELHALCON(PVT)CALLELA FIESTA(PVT)
CALLEEL BOSQUECILLO(PVT)
CALLE
LA
GRANADA(PVT)
PASEO GIR ASO
L
DELRAYO CT.
CAM IN O
AVELLAN A
VIA AC IA N D O
YORBA
LIND
A
P
L.
SOBRE(PVT. )COLINAS
PL.
G
ALAN O ( PVT.)DR.
N
OV
INA
(P
VT.)PL.
LAVETA
(
PVT.)DR.
G ALAN O ( PVT.)DR.
PAS EO
ESP LEND IDO
(PV T)
VIA AC OR DE (PVT.)
SAN TA SUS AN A (PVT ) RD
SAG E BR O OK ( PVT) C T
CO LD SP RIN GS
(P VT) C T
SIL V ER SAG E
( PVT) C T
STO NEG ATE (PVT) RD
STAG E TR AIL (PVT ) RD
CAR RIZO C REE K (PV T) RD
NU EZ ST
NU EZ
S
T
CAS TIAN O S T
M A NZA NO ST
RO BLES ST
PION EE R (P VT) S T
PRA IRIE
(PVT)
ST
SAWB UC K
(PVT)
ST
M U STAN G (PVT) ST
T O WN S ITE PR O M E N AD E (P VT )
EA
R
L
JO
SE
P
H
(P
VT
)D
R
SETTLE R
(PVT) ST
C
AM
IN
O
TIER
R
AS
AN
TA
(PV
T)
SAN TIAG O S T
PROM EN ADE DR
TOW N C ENT ER E AST (P VT)
M IA N P LAZA
SER RA (P VT) S T
PED RO (PV T )ST
GA SPAR (PVT) S T
SEBA STIA N
(PVT) ST
VISC AINO
(PVT) S T
SO L A RE S (PV T) S T
M A RTIN A(PVT) STDO M ING UE Z (PV T) ST
K A Y L E E L N
WE S TL A N D
D R
O U T R I D E R LN
D A S H LN
M O R T E R LN
M A R S H A LL D R
WA G N E R LN
M A R LE E LN
R E N D A R L N
B R Y A N T D R
WEST PARK CT (P VT)
M IK E LO ZA D R (PV
T)
ARB OLE DA R D
SAFFR O N C TJOVA
NA
C
T
REX TON D R
S E M I N A R Y
PARK WES T DR (PVT )
PARK WES T DR (PVT )
B L EVE BL
OLD SEM IN ARY (PVT.) R D.
C A M A R I L LO P L A Z A ( P V T . )
PEC
A
NA
S
T
R AN CH O
C
A
M
PAN
A
(PV
T)
EDWA RD SC HO LLE D R (P VT)
EDITH RO U SE D R (P VT)
WELLSP RIN G
ST (PV T)NED CH ATFIELD DR (PV T)
PO ND ERO SA DR
GU Y TU RN ER D R ( PVT)
VIA TIVO LI
CALLE A RM ISTA D
VIA CH ELSE A
CALLE A L TAM IR A
VIA ALM AR
CALLE C AS TILLA
VIA BE ATRIZ
CALLE D E PA LM A
VIA ZIBE LL O
VIA VALLAR TA
CALLE C AM P ESIN A
CALLE D EA RIBO
VIA CO R T A
CALLE A RO M ITAS
VIA HE RM O SA
R
U
B
IO
AV
EUCLID
AV
AL LEY 8
A L LEY 10
BENT
TW
IG
AV
BA
JA
V
IS
TA
W
Y
W
E
S
T
O
N
C
I
COR TE
EST RELLA
C
ALLE
SUERTE
B
U
EN
O
S
TEM POS
DR
W
O
LV
E
R
TO
N
A
V
RAEM ERE ST
SENAN
ST
AL B ORA D A D R
CORTE ELEGANTE
GRA H AM A V
CO M A N C
HE
CT
D
A
W
SO
N
D
R
O
B
R
IE
N
C I
S
IE
RR
A
M
A
D
R
E
D
R
RO
SEW
O
O
D
AV
AL LEY 1
VIA PESC ADO R
BEECHWOOD
ST
PLA
Z
A
D
E
L
R
A
N
C
H
O
CO RTE
CABALLO S
S
PAR
KM
AN
AV
CO RT E SOL
SKEEL
DR
C
A
LLE
M
A
D
U
RO
CHARTER
O
AK
D
R
FO UNT AIN
GO LDEN
AVENID
A
DE
APRISA
HUNT
CI
O LIVO C T
CALAM
AR
CT
PA
SEO
M
ARAVILLA
ALTA
COLINA
RD
H EDGE LN
VIS
TA
P
ALACIO
RANCHO
CALLEGUAS
FEN
MOR
E
A
VVIA
ARACENA
V
IA
OLIV
ERA
GRANDVIEW
CI
BROO
KHILL
DR
AL M E NDRO W Y
MESQUITE
ST
CALLE
PORT IL LA
SHARON
D
R
K
E
N
N
E
T
H
S
T
D
AR
A
S
T
CALAVERAS
DR
R
O
W
LA
N
D
A
V
DWIG HT
A V
CO RBY
AV
A
G
U
S
TA
AV
RE GE NT S T
AN
A
C
A
PA
D
R
MU
RRAY
AV
E L C ORT IJO
P L
CO
RTE
O
LIV
AS
BO
R
D
E
A
U
X
AV
C
A
LL
E
CIRCU LO
BR
O
OKH
AVEN
AV
AVENIDA
GAVIOTA
LYNDHUR
ST
AV
BAYW
OO
D
AV
VIA CU PERT INO
GLENN
D
R
WAVERLY
AV
VIA
M
AR
QUESA
CAMINO
LA
MADERA
DEW
AYNE
AV
VIA
ALONDRA
K
E
N
D
A
L
L
A
V
CALLE
C
ITA
LA
N
TA
N
A
S
T
MODESTO
AV
CRO YDON
AV
EAST PAR K
ABBO
TT
AV
D
UR
K
IN
S
T
G
EM
IN
I
AV
VALLE
LIND
O
DR
GRACIA
ST
MARCO
DR
W
A
LK
E
R
AV
CAMINO
T IERRA
SANTA
ALIENTO
WY
AVEN
ID
A
V
ALEN
CIA
L
A
K
ESID
E
A
V
SHEPHERD DR
VIA
PACHECO
APPLETREE
A
V
EL CAPITANPL
CO LO NIA PL
ALL EY
9 CR EST VIEW AV
F
ULTON
ST
B
R
A
D
F
O
R
D
AV
DEL N OR TE
RD
CO RT E LA CIENAGA
VISTA DEL
MAR
AV
N
O
R
D
M
A
N
DR
W
V
E
N
T
U
R
A
B
L
CALLE LARIOS
VIA
ZA
M
O
RA
C
A
L
LE
S
AN
PABLO
CO
NSTITUTION
AV
CALLE
E
S
CA
LO
N
B
E
LD
E
N
AV
PARK N
RIDE BL
VERDUGO
WY
VIA
TERRAD O
CA LLE CA RG A
ALL EY 6
AVO
CAD
O
PL
M C CULL OC H ST
L ONSD ALE ST
SHERBO RNE ST
FAR NWO RT H ST
DER BY ST
SH ALIMAR ST
G OR M AN ST
W IL CO X ST
C ANO GA
PL
S
E
Y
B
O
LT
AV
S
O
U
T
H
FIE
L
D
R
D
PAR RON
S
T
C
A
R
T
A
G
E
N
A
S
T
AL LE Y
RIPL EY ST
BEAR
D
SLEY
RD
SH OR EL IN E ST
SA
N
C
H
E
Z
D
R
B
E
N
IT
O
D
R
M
A
R
K
ER
AV
C
IPR
IAN
AV
ROM
AN
AV
CO RTE REG ALO
SEREN O
PL
M
AR
VISTA
DR
T RUM AN ST
PICKW IC K DR
FARIA
ST
W. VENT URA BL
CAM
B
O
N
A
V
ACA
CIA
ST
CALLE
CONVERSE
LA
MARINA
D R
EN CINO AV
E
M
P
R
E
S
S
AV
DUV AL L AV
CO RT E M ALPASO
KIM BERLY AV
FIESTA DR
CAM
ARILLO
RAN
CH
R
D
MAYA
LINDA
LEATHERW OOD ST
CALLE
TESORO
G
E
N
E
IV
E
S
T
TIFFA
NY
C
T
DORM AN
ST
MILPAS
ST
REDDINGTON
CT
PONDEROSA
DR
SANTO
DO
M
IN
G
O
CAL LE ALT O
C
A
LLE
C
A
M
E
LLIA
MERCED DR
ALTA
SAGU
NA
CT
BANCRO F T ST
G RANG ER ST
VISTA
MERCADO
JA
Y
AV
C
A
L
LE
P
LA
NO
LA
CULEBRA C
I
B
A
R
TO
N
A
V
SP A NIS H M O S S
PL
PARKHILL
CT
VIA
VELA
C
A
L
LE
LA
R
O
C
H
A
LATH
AN
AV
A
CALA
ST
CALLE
ALBERCA
FAYTON
CT
LEVEN
AV
C
A
L
LE
L
A
P
R
A
D
A
HERRO
N
CT
HA CIE NDA DR
CORT E
PA S TO RA L
FIELDGATE
DR
VA
LLE
Y
VISTA
DR
M
ARDIGR
AS
CT
DARN ELL CT
ALGONQU
IN
C
T
LEAFW
OO
D
D
R
CABRILLO
MESA CT
D EERFIELD CT
BALM OR AL C T
PE P P E RW OO D
DR
D
O
MIN
ICA
C
TE
AVIADO
R
ST
BOG ART ST
FA
IR
C
H
ILD
AV
CAMARILLO
CENT ER
DR
CORT E
VIE NT O
G
LENBROO
K
AV
GREEN VALE
DR
TA NGL E WO OD
DR
HUG HES DR
RID DE N S T
GRE E N
GLA D E
CT
CORT E
AG UA CA T E
CORT E
GO LO NDRINA
CORT E
COL IN A
K
E
LLE
Y
AV
NELLOR
A
ST
FO
RAR
CI
ALLEY
4 ALLEY
2 CORT E
CA S TA NO
BRAM BLE CT
CHRIST INA
C T
CALLE
NAVARRO
M ARIANO
ST
C
A
M
B
R
IA
CT
AVENIDA
ACASO
H
E
DO
N
CI
ALLEY
15 CHU LA
VISTA
C
T
CA M INO
RA NCHE R O
SA N TA A N ITA
CT
W
OO
D
R
D
VIA
LEAL
CAMIN
O
ESTRAD
A
YE A R LIN G
CT
HELMA CT
BIG HO RN
CT
R O YCE CT
PL A ZA LA
VIS TA
CALABRIA
CT
WO ODG A TE
CR
BARCA ST
SUN
ER
C
I
TRE E FE RN
CT
OR CH AR
D
VIEW
PINE H URS T
PL
CREST VIEW AV
VIA
AL CA ZA R
AL OHA
ST
VIA DE LSU E LO
CORTE
TU
LA
ROSA
CORT E
VINA
DE X TE R
ST
SEQUAN CT
EL NIDO
ST
TIE RRA
LIN DA
CT
P
AS
E
O
C
A
S
T
ILLE
C IPR ES CT
HABR A CT
PR IM A C T
CA S TA NO DR
CAM INO VE
RA
CRUZ
VANGUARD
DR
TEJO N C T
ST O NE -ME A D OWCT
PL AT E A U
CT
VIKING
DR
CA
MINO
ALVAREZ
OA K HUR S T
CT
W
ESTW
OO
D
DR
VERD ULERA ST
DAW S O N
PL
PARKWAY
DR
JU
LIA
C
T
CA NT ER
AV
DA P P LE
AV
FACTO
R
Y
S
TO
RES
D
R
H
ARRIS
AV
SE R A PE
PL
PA S E O
YO LO
ALL EY 13
CORT E R OS A LINDA
LE AT HE R-
WO OD
CT
CA
MEO
CT
A
S
H
B
U
RY
C
T
DAPHNE ST
CALLE MA
PAC
H
E
CO RT E
FRONDOSA
C LA
YTO
N
CT
HOBART
DR
CREST VIEW AV
KIN O ST
BEVERLY
DR
C
E
R
R
O
V
IS
TA
W
Y
A L LEY
12 SIERRA
MESA
DR
BO LLIN
AV
MA N DA LA Y
CT
R ED O AK PL
KARENACT
BRIARF IELD ST
ESTON
ST
BE T T INA
CT
M ILBURN ST
A
V
EN
ID
A
S
O
LT
U
R
A
CO E
ST M
IL
LIG
A
N
D
R
CORTEFRESCA
BERW ICK ST
BLUE
OAK
ST
LANDEN
ST
VIA
LA
SILVA
CRANBRO OK
ST
SP
IN
D
LE
W
O
O
D
AV
CA LLE T E CA TE
M ESA
DR
LA
UREL
PARK
CI
RIVERM O RE
ST
GRAN DVIEW
DR
F RANC IS AV
S
TA
U
N
T
O
N
S
T
CORT E
CORRIDA
PL
ASHBURY C T
CASTANO
ST
F
A
LLEN
LE
A
F
AV
RIDG E
VIEW ST
P
IC
K
E
T
AV
BRON SON ST
EL
R
ANC
HO
D
R
CAL
LE
T
IE
R
R
A
VISTA
W ENDELL ST
FO RTUN A
AV
L EONAR D
S
T
PO G GI
ST
JA
P
O
N
IC
A
AV
P
A
LM
E
R
A
V
KLAM
ATH
DR
ID A ST
S
W
E
E
T
W
AT
E
R
AV
SU NGR OVE DR
STILES
AV
VIA DEL NOG AL
LA
K
E
H
U
R
ST
AV
S
ATUR
N
S
T
SHIRLEY ST
DUM ET Z ST
SP IND LE -
WO OD
CT
CALLE
CANCUN
RAM ONA
DR
PE O P LE S
AV
VIA
TO
M
AS
G ENEIVE
CI
WINDS O R
CT
A Q UA
V ER DE
CT
CU RT
DR
AILEEN ST
NE WQ UIS T
CT
HACIENDA
CI
VISTA
COTO
VERDE
SOR REL ST
CHE LS E Y
CT
DEERH URST
AV
A N GUIL A PL
VIA
CALDERO N
VINCENTE
AV
G
R
E
E
N
L
AW
N
AV
A L M ENDROCT
LADERA
VISTA
DR
CALLE COVINA
MISSION
LEW
IS
RD
PLEASANT
VALLEY RD
PLEASANT
VALLEY
RD
CENTER
SC
HO
O
L
R
D
CENTRALAV
FAIRW
AY
DR
ADOLFO
RD
TEM
PLE
AV
VALLEY
VISTA
DR
ADOLFO
RD
LA
S
PO
SAS
R
D
CA
RM
EN
DR
A
RNEILL
R
D
SANTA
RO
SA
RD
LAS
POSAS
RD
SOMIS
RD
LEWIS RD
LEWIS
RD
PLEASANT VALLEY RD
ELNIDOCT
STONETREE AV
EU CLID A V
ELM
DR
PALM
DR
JAPONIC A
CT
PASEO
M
ONTELENA
CALL E
MEND OTA
JO
S
E
AV
LUCEROC T
L
E
X
IN
G
T
O
N
C
T
PANCHO
RD
CEBOLL A D R
CO RONA
ST
SAN YS
IDR
O
S
T
CAM INO
ESPLENDID O
CALLE
HIGUERA
SA U S AL IT O
DR
CO LONY
DR
CORTE BARROSO
O RENA
CT
C
A
LL
E
LA
PA
L
M
ER
A
EX E T E R
CT
CALLE
L
A
R
O
D
A
AVENIDA
DEL
M ANZ ANO
GE T M AN S T
O
AK
ST
M
E
R
R
IT
T
A
V
FIR S T
CALL E LA
SO M BRA
H
ILLC
R
E
S
T
DR
APPLET REE
CT
ALTA
VISTA
PL
DU NNIGAN ST
SU NRIS E
CT
LU
NA
DR
BREACTC
A
LL
E
B
E
LL
A
V
ISTA
FENM OR E
CT
ELM A
ST
AS H DA LE
CT
M AGN OL IA ST
CALL E
LA G UERR A
EDGEM ONT D R
V I A
JACARA
CALL E
A R GO LLA
BAR RY ST
LO MITA ST
CALLE
LA
C
UM
B
R
E
PL A CITA
BU E NA
ROS A
B
IS
C
AY
N
E
AV
RO CKLYN
ST
APPIAN
VIS TA
CI
LOS NO GAL ES ST
V ET ERANS
WY
ANT ONIO
AV
MA Y B RO OKAV
SELBY CI
DANBROO K
AV
ALLEY
3 CHE RO K E E
CT
PASEO
BAR
O
NA
HAR TNEL L
ST
CALLEVISTA
B ED FO RD
CT
VIA
CORZ A
C
E
N
TE
N
N
IA
L
A
V
BELAIR
CT
AM BER
DR
GER M AIN ST
CORT E
CE RRITO
W
EST
LOOP
DR
A L LEY 11
ASCOT PL
B E LM ON T A V
M
O
B
IL
AV
LUCERO
ST
TEMPLE
AV
LOR E TA
CT
GRA V E S
CT
LO
M
A
D
R
TAM AR IX
ST
KN IG HT
RON DO
BURNL EY ST
B
R
IARF IELD
ST
G ARDENIA
AV
C HAPEL DR
B
A
R
C
E
LO
N
A
S
T
BA Y WO O D
CT
M
ORENO
DR
HAY DE N S T
CO
TTAG
E
G
R
O
V
E
A
V
FLO
R
A
V
IS
T
A
A
V
LEM ON
DR
K EYSERROND O
MCL EOD
ROND O MARSHROND O
M UN SON
S
T
GE M INI CT
IS LACT
CORT E
TE LA
DELG ADA CT
G
R
A
N
A
D
A
S
T
CORT E
OLM O
EL CARAZ O N CT
YOLAN DA
ST
JAPONIC A
P L
DWIG HT
CT
DWIG HT
CT
PASEO
CAM ARILLO
DWIG HT
AV
M
ISSIO
N
DR
S
TO
N
E
M
E
A
D
O
W
D
R
CORT E
AZ A L
CORT E
A M IG OS
VIS TACT
IR OQ UO IS CT
APACHE CT
SA B E T
CT
CH APEL D R
SEVILLA ST
WAVERLY CT
VENT URA BL
CAM
INO
CASTENADA
EARL
JO
SEPH
DR
CEDAR
DR
CAM
ARILLO
ST
BRENTLY
AV
ALLEY
5 CHAN DLER ST
PLEASANT VALLEY RD
TRELLIS
PL
BRIDGEH AM PTO N WY
VIA RO SAL
BE
LLAFONTECT
BRIDGETO NWY
PO ND DR
BRID GEHAM PTO N W Y
B
R
ID
G
E
H
A
M
P
TO
N
W
Y
ST
PETIT ST
B
R
IARF IELD
ST
GRADA
AV
DEL
CIERVO
PL
LA
PUMA CT
DESEO
AV
CA M INIT O
LUIS A
ESTABAN
D R
CA B R ILLOW
Y
TW
IL
IG
H
T
C
T
C
ER
R
O
C
REST
DR
GARRIDO
DR
LA CRESCENTA
DR
TRELLIS
PL
ALTAMONT W Y
CALLE
DEL
N
O
R
TE
R
A
M
O
NA
PL
G
ARD
ENIA
AV
VIA
V
EN
E
T
O
TIVERT O N DR
M
AR
SALA
W
Y
VIA
DULCE
CALLE
DESCANSO
AV
ENID
A
NAV
IDAD
PADRE
LN
MESA
DR
F AIRWAY
DR
VIA
SECOYA
C
O
M
M
ON
S
PARK
DR
LA
N
TA
N
A
S
T
G
OLD
ENSPUR
D
R
CAM IN O C O NCORDIA
LOM A DR
C
E
LE
ST
IA
L
P
L
VA LLEY VISTA DR
A
LO
STA
DR
VISTA
DE
L
CAMPO
MISSIO N
DR
H
IG
HLAND
DR
LAS
PO
SAS
R
D
AVOCADO
PL
WRIGHT
RD
O
C
E
AN
VIEW
DR
CATA
LIN
A
DR
SAN
MIGUEL
DR
CALLE PORT AD A
PIROPO CT
VIE
N
TO
S
RD
PENZ ANCE AV
BUT T ERCUP L N
VIA D ELCE RRO
MARIA
LN
VENTURA
BL
STU RG IS
RD
M ANSFIELD
LN
L A
SUEN
D R
SA
N
VITO
L N
LEM ON
DR
W HITE ROCK RD
C ORRIENT E C T
BRENT FO RD CT
CAMINITO
MIRAD
O
R
NATALIE W Y
SY C A MO RECOT TA G ECT
NORM A CT
ALTA
VISTA
PL
BEVERLY
DR
LA
PAT ERA
DR
SUDAR IO C T
EL TUACA CT
ALVISO
DR
SOMIS
R
D
CAM IN ITO
PO SADA
CALLE ORINDA
AVEN
IDA
CAFE
GARRIDO
CT
PARADISE
CI
OL D
CO
ACH
D
R
NEISH ST
NANCY ST
LAS
ESTRELLAS
CT
VIA
C
O
N
D
IO
S
AVO
C
A
D
O
PL
COR DOV A
ST
FIESTA D R
MO NT S A LA SCT
BEARDSLEY
RD
C
O
RTE
MO
NARC
A
AVENIDA
AC
AS
O
LA
PAT E RA
CT
CA LLE LO S
AC E IT UNO S
CA M A RIL LOOUT LE T
GUINDA
CT
PL UM B A GO
ST
M EL IA ST
FA IR GRO V E
CI
PASEO
DEL
CAM PO
VISTA DEL CIM A
PR E S ILL A
PL
CASTLETO
N
S
T
BU E NA
VIS TA
DR
CORTE
O
LIVAS
M
ARINE
VIEW
DR
JODY LN
VIA DECANT O
OT E RO
CT
BR
IS
T
E
R
PA
R
K
C
T
TO
W
N
FO
R
E
ST
C
T
CANO PY DR
D
AV
E
N
P
O
R
T
S
T
R
IENTE
ST
FA
IRW
AY
CT
S P RING P A RK R D
RA
M
ONA
D
R
AVO
CA
DO
C
T
VALE
N
C
IA
DR
C OR TE TIARA
COTTA
GES
CT
WICK FO RD P L
PALA
VISTA
VILLAGE
AT THE
PARK
DR
LA S
TUE R O
CT
TABOR
CI
TRUENO
AV
CA M INOLAPO S A DA
SU E NOCT
CAL LADO
ST
CALLE
BRISA
ROS A DACT
VIA
F RESCO
VIA
PAJARO
LOP A COCT
CA LLECO RVA
VA NITA
PL
ALO HA
ST
WAY S IDE
C I
RE TIROCT
H
IG
HLAN
D
H
ILLS
RD
CA LLE
AC OP A DA
CA LLE
ROC A S
AZ A LE A
CT
CAL LE
AUR OR A
TAM ARIX
ST
HYA CINT H
S T
AL
CAMARILLO
DR
BEVERLY
CI
DR
ANACAPA
DR
ENCINO AV
CAR
M
EN
DR
VENT URA BL
VENT URA BL
W. VENT UR A BL
VALL EY VISTA DR
W Y
DA
WS
ON
DR
O
AKS
C
AM
IN
O
R
U
IZ
O
V
E
R
LA
N
D
R
D
FLYNN
RD
FLYN
N
RD
FLYNN
RD
AL
OS
TA
DR
W
AL
K
E
R
A
V
B
RENTLY
AV
M
O
B
IL
A
V
M
O
BIL
AV
LY
ND
H U RST AV
HIG
H
LA
N
D D R
HIGH LA N D DR
ANACAPA
DR
L
A
N
TA
NA
ST
LANTAN
A
S
T
CHAPEL
DR
V IA T E RR AS O L
AV O CA DO P L
PONDEROSA
PONDEROSA
DR
DA ILY DR
DR
Al ley 16
Alle y 20
A
lley
19 A
lle
y
1 8
A
L
1 7
TAHQU IT ZDR
PA
R
K
C
OTTA
G
E
P
L
GA Z E B O L N
AR B OR S T
VILLAGE COMMONS BL
DA ILY DR
DA ILY DR
DAILY
D
R
SP
R
IN
G
O
A
K
R
D
MIRA M A R ST
ADO HR L N
NORT H LO OP DR
EA S T L OO P D R
WE S T LO OP DR
FIRE ST AT IO N
W. VENTURABL
WILLO WGLE N CTB
LO
O
M FIELD
P
L
ELM
C
O
TTAG
E
C
T
BR EEZY DR
D USK DR
SPRINGVILLE
DR
FLYNN
RD
FLYN
N
RD
FLYNN
RD
R
O
W
L
A
N
D
AV
RO WL AND AV
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
TO WNS IT E P RO ME N A DE
5TH
ST
CA LIS TO GA R D
WEST PARK
CT
STERLING
HILLSDR
PONDEROSA
BEDFO
RD
DR
!(
!(!(
!(
!(!( !(
!(
!(
!(!(
!(
!(!( !(
!(
!(
!( !(
!(
!(
!(!( !(!(
!(
!( !(!( !(!( !(!( !(!(
!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !( !( !(!( !( !( !( !(
!(!(
!(!(
!(!(
!( !(!(
!(
!(
!(
!( !(!(
!(!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(
!(
!(
!( !(!(
!(!( !(!( !(!( !(!( !(!( !(!( !( !(!(
!(
!(
!(
!(!( !(
!(!(
!(
!(!(
!(
!(!(
!(
!(!( !( !(
!( !(
!(
!(!( !(
!(!(!(!(!(
!(
!( !(!(
!( !( !(!( !(!(
!(
!(
!(!(
!(!(
!(!(!(
!(
!(
!(!( !(!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(!(!(!(
!(
!(
!(!(
!(
!(!(!(
!(!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(
!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(
!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!( !( !(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(!(!( !(
!(
!(
!(
!(
!(!( !(
!( !(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(!(
!( !(
!(
!( !(
!(!(
!(
!(!(
!(!(
!(!(
!(!(!(!(!(!(!(!(
!(!(
!( !(
!(
!(
!(!(
!(!(
!(!( !(!(
!(!(
!(!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(!( !(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(!(!(!(
!(!(
!(
!(!(
!(!(
!(
!(!(
!(
!( !(
!(
!(
!(
!( !(
!(
!(
!(
!(!(!(!(
!(
!(
!(!(
!(
!(!(!(!(!(
!(!(!(!(!(
!(
!(!(!(!(!(!(
!(!(!(!(!(
!(
!(!( !(!(
!(
!(
!(
!(
!(
!(
!(!(!( !(
!(
!(!(
!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(!(
!(
!(
!(!(
!(!(!(!(!(!(!(
!(!(
!( !(!(!( !(!(
!(
!(!(
!(!(!(!(!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(!(!(
!(!(!(
!( !(!(!( !(!(
!(
!(!(
!(
!(
!(
!(
!( !(
!(!(!(
!(!(
!(!(
!(!(
!(
!(!(!(!(!(!(!(
!(!(!(!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(!(
!(!( !(
!(
!(!(
!(
!(
!(
!(
!( !(
!( !(
!( !(
!( !(
!(!(
!(!(
!( !( !(
!(
!(
!(
!(
!(
!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!( !(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(!(!(!(!( !(!(!(
!(
!(
!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !(!(
!(
!(!(
!(!(
!(!(!(!(
!( !(!(!( !(
!(!(!(!(!(!(!( !(!(!(!( !(
!(
!(!(
!(
!(
!(!(
!(
!(
!(!(!(
!( !(!(
!(
!(
!(
!(
!( !(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(!( !(!(!(
!(
!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(
!( !(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(
!(!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!( !(!(
!(
!(
!( !(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(
!(
!(
!(
!(
!(!(!(!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !( !( !( !( !( !(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!( !(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
329
328
327
326
321
323
325
321
322 214
215
216
218
219
211
213
105
101
101
102
108
107
106
103
104
433
330433
440
440
439
438
432
434
435
436
437
440
440
212
110
431
441
109
101
441
441
441
441
220R
324
104
217
217
220
220
101
105
108
321R
321R
321R
441
442
102
432
¯
Scale: 1" = 2,000'
Prepared by Information Systems Division
THIS MAP WAS CREATED BY THE CITY OF C AMARILLO GEOGRAPHIC INFORMATION SYSTEM, WHICH IS DESIGNED AND OPERATED SOLELY FOR THE CONVENIENCE OF T HE CITY AND RELATED PUBLIC AGEN CIES.
THE CITY DOES NOT WARRANT THE ACCURACY OF TH IS MAP, AND NO DECISION INVOLVING A RISK OF ECONOMIC LOSS OR PHYSICAL INJURY SHOULD BE MADE IN RELIANCE THEREON.
Thursday, February 8, 2024
Document Path: G:\CamarilloGIS\Projects\PublicWorks\WATER\Water Meter Routes\AMR_MeterLocations\Water Meter Routes_Feb2024.mxd Legend
!( AMR Meter Retrofit
AMR Meter Retrofit Areas
Cycle 1
Cycle 2
220R (cycle 2 radio read)
Cycle 3
321R (cycle 3 radio read)321R
Cycle 4
Cycle 4 route 441 & 442
Parcels
220R
City boundary
City of Camarillo
Water Meter AMI - YEAR 2
YEAR 2 REPLACEMENT SCHEDULE:
1. Replace 3/4" meters in Cycles 3, 6, and 7
2. Replace all 1.5" Meters in the City
3. Replace 2" meters in Cycles 2, 6, and 7
- Indicates 3/4" meters to be replaced
- Indicates 2" meters to be replaced
Note: Cycles 6 and 7 are spread throughout the City.
C O R T I N A( P V T . )C A M I N O
( P V T. ) LN .
( P V T. ) LN .
( P V T. ) LN .
( P V T. ) LN .
B R I D G E P O R T
O N D A
( P V T . ) D R .
B A N D E R A( P V T . ) D R .
D E L P R A D O
( P V T . ) D R .
E S C O N D I D O
D R .( P V T . )
E S T A N C I A ( P V T. ) P L .
R A N A ( P V T . ) P L.
C O R T E ( P V T. )
D E D E B E S A
PAS E O
VE RD E (P VT. )
ST.
DE SE O
A V E.
VIS TA M O N TA N A (PV T.) S T.( P V T. )
D E M A R E JA D A
C A L L E
CH U C KA R
(PV T.) LN .
O RA N G E ( PV T.)
LN.
ALO S TA ( PV T.)LN.
ALO S TA ( PV T.)
PL.
(PV T.) WY.
PARK
WEST D R ( PVT)
E . E D G E WA T E R
E . D O C K S I D E
E . P I E R S I D E
B
CIR.
H U G H E S ( P V T . ) R D .
( P V T. )
(PVT.) A VE.
HORIZ ON
(PVT.)
A I RPORT WY .
A VE. (PVT.)
DR.
S KYWAYE U B ANKS ST.
(PVT.)
(PVT.)
A VIATI ON DR. ( PVT.)
WILL IS
(PVT.)
DURLEY
8 FREEDO M PARK DR.
CONVAIR ST.
P O ST ( PVT.) ST.
(PVT.) ST.
HOUCK
S T INSO N
(PVT.) ST.
26 P O ST ( PVT.) ST.
(PVT.) ST.
S T EARM AN
JO N N A
C I R .
H E B E R T
D R .
C I R .
H E B E R T ( P V T . ) . D R .
JO N N A ( P V T . )
B R I A N
( P V T . ) C I R .
B R I A N
C I R .
M A L LA T T
WY .
R O B Y N
WY .
S U E
LN .
WI L D O N R D .
LO I S L N .
P
H
E A
S
A
N
T
H
I
L
L
( P
V
T
. )
LN .
( P V T . )
LN .
D E E R
H U N T E R
C A M I N O
( P V T . )
T0 L U C A
C A LL E
LO S G A T O S ( P V T )
( P V T . )
B A J A C T.
B A J A C T.
( P V T . )
V I E J O D R .( P V T . )
C O R O N A D 0 C T .
( P V T . )
LI D O C T .
( P V T . )
( P V T . )
C A P I S T R A N O C T.
M O N T E V I S T A ( P V T. ) D R .
H O LL Y ( P V T. ) D R .
( P V T . ) D R .
D E L
P R A D O
( P V T . ) C T.
JA L I S C O
( P V T . ) D R .
S O N O R A
( P V T . ) C T.
TA X C O
( P V T . ) C T.
D U R A N G O
( P V T . ) D R .
C H A P A LA
V I S TA ( P V T. ) D E L S O L
E L S O N E T O
C T. ( P V T . )
C O R T E
LE JO S ( P V T . )
LO S A LI S O S
C T. ( P V T . )
CALLE
SEG UN DA ( PVT.)
PASE O LO M A (PV T .)
LO S
S A N T O S C T .
TI E R R A
B U E N A
L A VER AD A
(PVT.) C T .
A V E N I D A ( P V T. ) M A G D A L E N A
A R R O Y O ( P V T. )
P A S E O ( P V T. ) D E C O R TA G A
V I S TA ( P V T. ) D E L S O L
D E L V A LL E
C A LL E ( P V T. )
M I R A S O L
D E L M A R
P A S E O
C A LL E( P V T. )
M I G U E L
P A S E O( P V T. )
A R R O Y O
P A S E O ( P V T. ) L U N A R
C A L L E
( P V T . ) C U E S T A
AG UILA
CALLE
(PVT.)
CALLE
ESC OR IAL
(PVT.)
CALLE
DE
L A
RO SA
(PVT.)
(PVT.)
R
O
SAL
VIA
P I C A D O D R .
V I A ( P V T. ) C A N T I L E N A
C A LL E ( P V T. ) A R G O LL A
V I A M E D A N O S
C A LL E O R O V I S TA
P A S E O ( P V T . ) S A B A N E R O
C A LL E
R
A
N
C
H 0
FR O N T E
T
A
H
Q
U
I TZ
D R .
T
A
L
U
D
T
E
R
R
A C E
T R A
N Q
U I L A
TR A N Q U I L LA
C I R .
D R .
R A N C H OA D O L FO
( P V T . ) C T.
C A LE T A
( P V T . )
TA H Q U I TZ
C T.
A D O L FO
( P V T . ) D R .
D R .
C T.
C A LE T A
A
C
A
L
L
E
( P
V
T. )
D E
D E
B E
S A
C O R T E ( P V T. ) D E E N C I N I T A S
C O R T E ( P V T. ) D E Q U I N T E R O
CO R TE
(PV T.)RIV IE RA
CO R TE
(PV T.)
AU G U STA
(P
V
T
.)
A
V
E
N
ID
A
DE AU TL AN
J EWEL (P VT ) CT
S T E R L I N G H I L L S
( P
V T
.)
D R .
AVE N ID A
(P
V
T
.)
D
E
AU TLA N
P
A
T
IN
A
(
P
V
T
.)
C
T
.
TO WE R
( P V T .)C T .
CLU B
(PV T.)
CT.
DIA M O N D
(P
V
T
.)
DR .
D
IA
M
O
ND
(PV T.) DR .
LA P LATA
GO
LF
V IL LA
(PV T.) D R .
(PV T.) W Y.
DE L TIO(PV T.) C T.
M A XIN E
WILDE N
(PV T.)
C A M I LA R
M
L
A
E
S
W
N (PV T)
E
C
TNE
TH O ST (P VT.) D R .
SA NT A
C
R
U
Z
M ISS IO N TR .
( PV T.)
(PV T.)
( PVT.)
PL
.
(PVT.) LN .
(PVT.) D R.
( P V T. )
D R .
Y
.
WY.
G YP SY (P VT.) LN .
ALO S TA
C A M P A N E R O
C A LL E ( P V T. )
LO RI LN . (P VT.)
C O U NT R Y V IE W
PIN O ( PVT. ) C T.
BE LL
(PV T.)
CT.
RE SE D A(PV T.) C T.
RIO
HA TO
(PV T.)
(PV T.)
RD .
HU E RTA
( P V T . )
M O N T O Y A
V I A
M ENT A ( PVT .) L N.
GR AC E (PV T .)
CT.
M AR IS SA
LN.
(PV T)
S A N L E A N D R O
P L A C I TA ( P V T . )
A N TE R O
( P V T. )
S A N
A V E N I D A
S A N R U FI N O( P V T. )
P L A C I TA
S A N D I M A S
( P V T. )
P L A C I TA
( P V T. )
G A R C E S
A V E .
S E M I N A R Y
( P V T . )
R D .
BEL L R AN CH ( PVT .) RD .
OLD SO M IS (PV T .) R D.
C A LE T A ( P V T. ) D R .
C T .
V I LL A M O N T E
V I A M A N TI LL A
( P V T . )
( P V T . )
( P V T . )
R D .
CA M IN O A VE LLA N A
CA LLE S E RR A
VIA AR A N D AN A
VIA SE C O YA
V I A A C I A N D O
LO S D A M A S C O S P L.
LA T UN A C T.
CO R T E A R BU S TO
LA S V E R E D A S P L .
R O M E R O
P L .
M A RR ISA (P VT)
CALLEBRISA
VALER O (P VT) W Y
(PVT)W
Y
RO
SETTA
SANTO
DOM
INGO
(PVT)
WY
(PVT)
CED AR BR OO K
(PVT) WK
(P VT
)DR
.
R O CK H AM PTON
SHA DET REE
(PVT) WY.
L IG H TWO OD (PV T) ST.
I V Y
GA RD EN
(PVT) CT.
GLE NP OST
(PVT) DR.
VIA (PV T .)
P ALOM A
CALLE ( PVT.)
PARA DO R
VIA (PV T .)
L IS BO A
VIA (PV T .)
SINTR A
V I A ( P V T. )
M A R I S M A
V I A ( P V T. )
G A B I LA N
CAM INO (PV T .)
ALGA RVE
CAM IN O ( PVT.)
VALVER DE
CALLE ( PVT.)
VIEJ O
R E FU G IO
CT. (P
VT
)
AUB UR Y (PV T)
PL.
VIA(PVT)
REA LVIA SER EN A
(PVT)
VIA BO NITA
(PVT)VIA
DEL(PVT)SOL
VIA(PVT) PRESIDIO
(PVT) CT.RIVE RD ALE
SUM E RTO N (PVT) CT.
BRO O KSH IRE (PVT) CT
V
IA
RO
SAL
(PV
T)
DURLEY AVE
A VIATI ON DR.
A V I A T I O N D R .
MAIN ST
B O WLI NE BLHIGH ANGL E HWE M ORY L N
PASE O D E LO S PE T A LOS
AVEN IDA DE M A RG AR ITA
VIAALLEGRA
VIAALLEGRA
C
ALLE D
EANEPOLA
POSADA
LILLIA
P
ETA
LO
CIRCULO
JARD IN
ANCHO RS DOWN (PVT ) WAY
ENCINO
(P
VT)D R.
HIG H LA N D
TER R A CE (P V T)
E CA LL E LA G UER RA ( PVT)
CALLE LA GRANADA(PVT)
CALLE
ELC
ONDOR(PVT)
CALLE ELAVION(PVT)
CAMINO
LAM
ADERA(PVT)
C
ALLELA
CUMBRE(PVT)
CALLE
ELHALCON(PVT)CALLELA FIESTA(PVT)
CALLEEL BOSQUECILLO(PVT)
CALLE
LA
GRANADA(PVT)
PASEO GIR ASO
L
DELRAYO CT.
CAM IN O
AVELLAN A
VIA AC IA N D O
YORBA
LIND
A
P
L.
SOBRE(PVT. )COLINAS
PL.
G
ALAN O ( PVT.)DR.
N
OV
INA
(P
VT.)PL.
LAVETA
(
PVT.)DR.
G ALAN O ( PVT.)DR.
PAS EO
ESP LEND IDO
(PV T)
VIA AC OR DE (PVT.)
SAN TA SUS AN A (PVT ) RD
SAG E BR O OK ( PVT) C T
CO LD SP RIN GS
(P VT) C T
SIL V ER SAG E
( PVT) C T
STO NEG ATE (PVT) RD
STAG E TR AIL (PVT ) RD
CAR RIZO C REE K (PV T) RD
NU EZ ST
NU EZ
S
T
CAS TIAN O S T
M A NZA NO ST
RO BLES ST
PION EE R (P VT) S T
PRA IRIE
(PVT)
ST
SAWB UC K
(PVT)
ST
M U STAN G (PVT) ST
T O WN S ITE PR O M E N AD E (P VT )
EA
R
L
JO
SE
P
H
(P
VT
)D
R
SETTLE R
(PVT) ST
C
AM
IN
O
TIER
R
AS
AN
TA
(PV
T)
SAN TIAG O S T
PROM EN ADE DR
TOW N C ENT ER E AST (P VT)
M IA N P LAZA
SER RA (P VT) S T
PED RO (PV T )ST
GA SPAR (PVT) S T
SEBA STIA N
(PVT) ST
VISC AINO
(PVT) S T
SO L A RE S (PV T) S T
M A RTIN A(PVT) STDO M ING UE Z (PV T) ST
K A Y L E E L N
WE S TL A N D
D R
O U T R I D E R LN
D A S H LN
M O R T E R LN
M A R S H A LL D R
WA G N E R LN
M A R LE E LN
R E N D A R L N
B R Y A N T D R
WEST PARK CT (P VT)
M IK E LO ZA D R (PV
T)
ARB OLE DA R D
SAFFR O N C TJOVA
NA
C
T
REX TON D R
S E M I N A R Y
PARK WES T DR (PVT )
PARK WES T DR (PVT )
B L EVE BL
OLD SEM IN ARY (PVT.) R D.
C A M A R I L LO P L A Z A ( P V T . )
PEC
A
NA
S
T
R AN CH O
C
A
M
PAN
A
(PV
T)
EDWA RD SC HO LLE D R (P VT)
EDITH RO U SE D R (P VT)
WELLSP RIN G
ST (PV T)NED CH ATFIELD DR (PV T)
PO ND ERO SA DR
GU Y TU RN ER D R ( PVT)
VIA TIVO LI
CALLE A RM ISTA D
VIA CH ELSE A
CALLE A L TAM IR A
VIA ALM AR
CALLE C AS TILLA
VIA BE ATRIZ
CALLE D E PA LM A
VIA ZIBE LL O
VIA VALLAR TA
CALLE C AM P ESIN A
CALLE D EA RIBO
VIA CO R T A
CALLE A RO M ITAS
VIA HE RM O SA
R
U
B
IO
AV
EUCLID
AV
AL LEY 8
A L LEY 10
BENT
TW
IG
AV
BA
JA
V
IS
TA
W
Y
W
E
S
T
O
N
C
I
COR TE
EST RELLA
C
ALLE
SUERTE
B
U
EN
O
S
TEM POS
DR
W
O
LV
E
R
TO
N
A
V
RAEM ERE ST
SENAN
ST
AL B ORA D A D R
CORTE ELEGANTE
GRA H AM A V
CO M A N C
HE
CT
D
A
W
SO
N
D
R
O
B
R
IE
N
C I
S
IE
RR
A
M
A
D
R
E
D
R
RO
SEW
O
O
D
AV
AL LEY 1
VIA PESC ADO R
BEECHWOOD
ST
PLA
Z
A
D
E
L
R
A
N
C
H
O
CO RTE
CABALLO S
S
PAR
KM
AN
AV
CO RT E SOL
SKEEL
DR
C
A
LLE
M
A
D
U
RO
CHARTER
O
AK
D
R
FO UNT AIN
GO LDEN
AVENID
A
DE
APRISA
HUNT
CI
O LIVO C T
CALAM
AR
CT
PA
SEO
M
ARAVILLA
ALTA
COLINA
RD
H EDGE LN
VIS
TA
P
ALACIO
RANCHO
CALLEGUAS
FEN
MOR
E
A
VVIA
ARACENA
V
IA
OLIV
ERA
GRANDVIEW
CI
BROO
KHILL
DR
AL M E NDRO W Y
MESQUITE
ST
CALLE
PORT IL LA
SHARON
D
R
K
E
N
N
E
T
H
S
T
D
AR
A
S
T
CALAVERAS
DR
R
O
W
LA
N
D
A
V
DWIG HT
A V
CO RBY
AV
A
G
U
S
TA
AV
RE GE NT S T
AN
A
C
A
PA
D
R
MU
RRAY
AV
E L C ORT IJO
P L
CO
RTE
O
LIV
AS
BO
R
D
E
A
U
X
AV
C
A
LL
E
CIRCU LO
BR
O
OKH
AVEN
AV
AVENIDA
GAVIOTA
LYNDHUR
ST
AV
BAYW
OO
D
AV
VIA CU PERT INO
GLENN
D
R
WAVERLY
AV
VIA
M
AR
QUESA
CAMINO
LA
MADERA
DEW
AYNE
AV
VIA
ALONDRA
K
E
N
D
A
L
L
A
V
CALLE
C
ITA
LA
N
TA
N
A
S
T
MODESTO
AV
CRO YDON
AV
EAST PAR K
ABBO
TT
AV
D
UR
K
IN
S
T
G
EM
IN
I
AV
VALLE
LIND
O
DR
GRACIA
ST
MARCO
DR
W
A
LK
E
R
AV
CAMINO
T IERRA
SANTA
ALIENTO
WY
AVEN
ID
A
V
ALEN
CIA
L
A
K
ESID
E
A
V
SHEPHERD DR
VIA
PACHECO
APPLETREE
A
V
EL CAPITANPL
CO LO NIA PL
ALL EY
9 CR EST VIEW AV
F
ULTON
ST
B
R
A
D
F
O
R
D
AV
DEL N OR TE
RD
CO RT E LA CIENAGA
VISTA DEL
MAR
AV
N
O
R
D
M
A
N
DR
W
V
E
N
T
U
R
A
B
L
CALLE LARIOS
VIA
ZA
M
O
RA
C
A
L
LE
S
AN
PABLO
CO
NSTITUTION
AV
CALLE
E
S
CA
LO
N
B
E
LD
E
N
AV
PARK N
RIDE BL
VERDUGO
WY
VIA
TERRAD O
CA LLE CA RG A
ALL EY 6
AVO
CAD
O
PL
M C CULL OC H ST
L ONSD ALE ST
SHERBO RNE ST
FAR NWO RT H ST
DER BY ST
SH ALIMAR ST
G OR M AN ST
W IL CO X ST
C ANO GA
PL
S
E
Y
B
O
LT
AV
S
O
U
T
H
FIE
L
D
R
D
PAR RON
S
T
C
A
R
T
A
G
E
N
A
S
T
AL LE Y
RIPL EY ST
BEAR
D
SLEY
RD
SH OR EL IN E ST
SA
N
C
H
E
Z
D
R
B
E
N
IT
O
D
R
M
A
R
K
ER
AV
C
IPR
IAN
AV
ROM
AN
AV
CO RTE REG ALO
SEREN O
PL
M
AR
VISTA
DR
T RUM AN ST
PICKW IC K DR
FARIA
ST
W. VENT URA BL
CAM
B
O
N
A
V
ACA
CIA
ST
CALLE
CONVERSE
LA
MARINA
D R
EN CINO AV
E
M
P
R
E
S
S
AV
DUV AL L AV
CO RT E M ALPASO
KIM BERLY AV
FIESTA DR
CAM
ARILLO
RAN
CH
R
D
MAYA
LINDA
LEATHERW OOD ST
CALLE
TESORO
G
E
N
E
IV
E
S
T
TIFFA
NY
C
T
DORM AN
ST
MILPAS
ST
REDDINGTON
CT
PONDEROSA
DR
SANTO
DO
M
IN
G
O
CAL LE ALT O
C
A
LLE
C
A
M
E
LLIA
MERCED DR
ALTA
SAGU
NA
CT
BANCRO F T ST
G RANG ER ST
VISTA
MERCADO
JA
Y
AV
C
A
L
LE
P
LA
NO
LA
CULEBRA C
I
B
A
R
TO
N
A
V
SP A NIS H M O S S
PL
PARKHILL
CT
VIA
VELA
C
A
L
LE
LA
R
O
C
H
A
LATH
AN
AV
A
CALA
ST
CALLE
ALBERCA
FAYTON
CT
LEVEN
AV
C
A
L
LE
L
A
P
R
A
D
A
HERRO
N
CT
HA CIE NDA DR
CORT E
PA S TO RA L
FIELDGATE
DR
VA
LLE
Y
VISTA
DR
M
ARDIGR
AS
CT
DARN ELL CT
ALGONQU
IN
C
T
LEAFW
OO
D
D
R
CABRILLO
MESA CT
D EERFIELD CT
BALM OR AL C T
PE P P E RW OO D
DR
D
O
MIN
ICA
C
TE
AVIADO
R
ST
BOG ART ST
FA
IR
C
H
ILD
AV
CAMARILLO
CENT ER
DR
CORT E
VIE NT O
G
LENBROO
K
AV
GREEN VALE
DR
TA NGL E WO OD
DR
HUG HES DR
RID DE N S T
GRE E N
GLA D E
CT
CORT E
AG UA CA T E
CORT E
GO LO NDRINA
CORT E
COL IN A
K
E
LLE
Y
AV
NELLOR
A
ST
FO
RAR
CI
ALLEY
4 ALLEY
2 CORT E
CA S TA NO
BRAM BLE CT
CHRIST INA
C T
CALLE
NAVARRO
M ARIANO
ST
C
A
M
B
R
IA
CT
AVENIDA
ACASO
H
E
DO
N
CI
ALLEY
15 CHU LA
VISTA
C
T
CA M INO
RA NCHE R O
SA N TA A N ITA
CT
W
OO
D
R
D
VIA
LEAL
CAMIN
O
ESTRAD
A
YE A R LIN G
CT
HELMA CT
BIG HO RN
CT
R O YCE CT
PL A ZA LA
VIS TA
CALABRIA
CT
WO ODG A TE
CR
BARCA ST
SUN
ER
C
I
TRE E FE RN
CT
OR CH AR
D
VIEW
PINE H URS T
PL
CREST VIEW AV
VIA
AL CA ZA R
AL OHA
ST
VIA DE LSU E LO
CORTE
TU
LA
ROSA
CORT E
VINA
DE X TE R
ST
SEQUAN CT
EL NIDO
ST
TIE RRA
LIN DA
CT
P
AS
E
O
C
A
S
T
ILLE
C IPR ES CT
HABR A CT
PR IM A C T
CA S TA NO DR
CAM INO VE
RA
CRUZ
VANGUARD
DR
TEJO N C T
ST O NE -ME A D OWCT
PL AT E A U
CT
VIKING
DR
CA
MINO
ALVAREZ
OA K HUR S T
CT
W
ESTW
OO
D
DR
VERD ULERA ST
DAW S O N
PL
PARKWAY
DR
JU
LIA
C
T
CA NT ER
AV
DA P P LE
AV
FACTO
R
Y
S
TO
RES
D
R
H
ARRIS
AV
SE R A PE
PL
PA S E O
YO LO
ALL EY 13
CORT E R OS A LINDA
LE AT HE R-
WO OD
CT
CA
MEO
CT
A
S
H
B
U
RY
C
T
DAPHNE ST
CALLE MA
PAC
H
E
CO RT E
FRONDOSA
C LA
YTO
N
CT
HOBART
DR
CREST VIEW AV
KIN O ST
BEVERLY
DR
C
E
R
R
O
V
IS
TA
W
Y
A L LEY
12 SIERRA
MESA
DR
BO LLIN
AV
MA N DA LA Y
CT
R ED O AK PL
KARENACT
BRIARF IELD ST
ESTON
ST
BE T T INA
CT
M ILBURN ST
A
V
EN
ID
A
S
O
LT
U
R
A
CO E
ST M
IL
LIG
A
N
D
R
CORTEFRESCA
BERW ICK ST
BLUE
OAK
ST
LANDEN
ST
VIA
LA
SILVA
CRANBRO OK
ST
SP
IN
D
LE
W
O
O
D
AV
CA LLE T E CA TE
M ESA
DR
LA
UREL
PARK
CI
RIVERM O RE
ST
GRAN DVIEW
DR
F RANC IS AV
S
TA
U
N
T
O
N
S
T
CORT E
CORRIDA
PL
ASHBURY C T
CASTANO
ST
F
A
LLEN
LE
A
F
AV
RIDG E
VIEW ST
P
IC
K
E
T
AV
BRON SON ST
EL
R
ANC
HO
D
R
CAL
LE
T
IE
R
R
A
VISTA
W ENDELL ST
FO RTUN A
AV
L EONAR D
S
T
PO G GI
ST
JA
P
O
N
IC
A
AV
P
A
LM
E
R
A
V
KLAM
ATH
DR
ID A ST
S
W
E
E
T
W
AT
E
R
AV
SU NGR OVE DR
STILES
AV
VIA DEL NOG AL
LA
K
E
H
U
R
ST
AV
S
ATUR
N
S
T
SHIRLEY ST
DUM ET Z ST
SP IND LE -
WO OD
CT
CALLE
CANCUN
RAM ONA
DR
PE O P LE S
AV
VIA
TO
M
AS
G ENEIVE
CI
WINDS O R
CT
A Q UA
V ER DE
CT
CU RT
DR
AILEEN ST
NE WQ UIS T
CT
HACIENDA
CI
VISTA
COTO
VERDE
SOR REL ST
CHE LS E Y
CT
DEERH URST
AV
A N GUIL A PL
VIA
CALDERO N
VINCENTE
AV
G
R
E
E
N
L
AW
N
AV
A L M ENDROCT
LADERA
VISTA
DR
CALLE COVINA
MISSION
LEW
IS
RD
PLEASANT
VALLEY RD
PLEASANT
VALLEY
RD
CENTER
SC
HO
O
L
R
D
CENTRALAV
FAIRW
AY
DR
ADOLFO
RD
TEM
PLE
AV
VALLEY
VISTA
DR
ADOLFO
RD
LA
S
PO
SAS
R
D
CA
RM
EN
DR
A
RNEILL
R
D
SANTA
RO
SA
RD
LAS
POSAS
RD
SOMIS
RD
LEWIS RD
LEWIS
RD
PLEASANT VALLEY RD
ELNIDOCT
STONETREE AV
EU CLID A V
ELM
DR
PALM
DR
JAPONIC A
CT
PASEO
M
ONTELENA
CALL E
MEND OTA
JO
S
E
AV
LUCEROC T
L
E
X
IN
G
T
O
N
C
T
PANCHO
RD
CEBOLL A D R
CO RONA
ST
SAN YS
IDR
O
S
T
CAM INO
ESPLENDID O
CALLE
HIGUERA
SA U S AL IT O
DR
CO LONY
DR
CORTE BARROSO
O RENA
CT
C
A
LL
E
LA
PA
L
M
ER
A
EX E T E R
CT
CALLE
L
A
R
O
D
A
AVENIDA
DEL
M ANZ ANO
GE T M AN S T
O
AK
ST
M
E
R
R
IT
T
A
V
FIR S T
CALL E LA
SO M BRA
H
ILLC
R
E
S
T
DR
APPLET REE
CT
ALTA
VISTA
PL
DU NNIGAN ST
SU NRIS E
CT
LU
NA
DR
BREACTC
A
LL
E
B
E
LL
A
V
ISTA
FENM OR E
CT
ELM A
ST
AS H DA LE
CT
M AGN OL IA ST
CALL E
LA G UERR A
EDGEM ONT D R
V I A
JACARA
CALL E
A R GO LLA
BAR RY ST
LO MITA ST
CALLE
LA
C
UM
B
R
E
PL A CITA
BU E NA
ROS A
B
IS
C
AY
N
E
AV
RO CKLYN
ST
APPIAN
VIS TA
CI
LOS NO GAL ES ST
V ET ERANS
WY
ANT ONIO
AV
MA Y B RO OKAV
SELBY CI
DANBROO K
AV
ALLEY
3 CHE RO K E E
CT
PASEO
BAR
O
NA
HAR TNEL L
ST
CALLEVISTA
B ED FO RD
CT
VIA
CORZ A
C
E
N
TE
N
N
IA
L
A
V
BELAIR
CT
AM BER
DR
GER M AIN ST
CORT E
CE RRITO
W
EST
LOOP
DR
A L LEY 11
ASCOT PL
B E LM ON T A V
M
O
B
IL
AV
LUCERO
ST
TEMPLE
AV
LOR E TA
CT
GRA V E S
CT
LO
M
A
D
R
TAM AR IX
ST
KN IG HT
RON DO
BURNL EY ST
B
R
IARF IELD
ST
G ARDENIA
AV
C HAPEL DR
B
A
R
C
E
LO
N
A
S
T
BA Y WO O D
CT
M
ORENO
DR
HAY DE N S T
CO
TTAG
E
G
R
O
V
E
A
V
FLO
R
A
V
IS
T
A
A
V
LEM ON
DR
K EYSERROND O
MCL EOD
ROND O MARSHROND O
M UN SON
S
T
GE M INI CT
IS LACT
CORT E
TE LA
DELG ADA CT
G
R
A
N
A
D
A
S
T
CORT E
OLM O
EL CARAZ O N CT
YOLAN DA
ST
JAPONIC A
P L
DWIG HT
CT
DWIG HT
CT
PASEO
CAM ARILLO
DWIG HT
AV
M
ISSIO
N
DR
S
TO
N
E
M
E
A
D
O
W
D
R
CORT E
AZ A L
CORT E
A M IG OS
VIS TACT
IR OQ UO IS CT
APACHE CT
SA B E T
CT
CH APEL D R
SEVILLA ST
WAVERLY CT
VENT URA BL
CAM
INO
CASTENADA
EARL
JO
SEPH
DR
CEDAR
DR
CAM
ARILLO
ST
BRENTLY
AV
ALLEY
5 CHAN DLER ST
PLEASANT VALLEY RD
TRELLIS
PL
BRIDGEH AM PTO N WY
VIA RO SAL
BE
LLAFONTECT
BRIDGETO NWY
PO ND DR
BRID GEHAM PTO N W Y
B
R
ID
G
E
H
A
M
P
TO
N
W
Y
ST
PETIT ST
B
R
IARF IELD
ST
GRADA
AV
DEL
CIERVO
PL
LA
PUMA CT
DESEO
AV
CA M INIT O
LUIS A
ESTABAN
D R
CA B R ILLOW
Y
TW
IL
IG
H
T
C
T
C
ER
R
O
C
REST
DR
GARRIDO
DR
LA CRESCENTA
DR
TRELLIS
PL
ALTAMONT W Y
CALLE
DEL
N
O
R
TE
R
A
M
O
NA
PL
G
ARD
ENIA
AV
VIA
V
EN
E
T
O
TIVERT O N DR
M
AR
SALA
W
Y
VIA
DULCE
CALLE
DESCANSO
AV
ENID
A
NAV
IDAD
PADRE
LN
MESA
DR
F AIRWAY
DR
VIA
SECOYA
C
O
M
M
ON
S
PARK
DR
LA
N
TA
N
A
S
T
G
OLD
ENSPUR
D
R
CAM IN O C O NCORDIA
LOM A DR
C
E
LE
ST
IA
L
P
L
VA LLEY VISTA DR
A
LO
STA
DR
VISTA
DE
L
CAMPO
MISSIO N
DR
H
IG
HLAND
DR
LAS
PO
SAS
R
D
AVOCADO
PL
WRIGHT
RD
O
C
E
AN
VIEW
DR
CATA
LIN
A
DR
SAN
MIGUEL
DR
CALLE PORT AD A
PIROPO CT
VIE
N
TO
S
RD
PENZ ANCE AV
BUT T ERCUP L N
VIA D ELCE RRO
MARIA
LN
VENTURA
BL
STU RG IS
RD
M ANSFIELD
LN
L A
SUEN
D R
SA
N
VITO
L N
LEM ON
DR
W HITE ROCK RD
C ORRIENT E C T
BRENT FO RD CT
CAMINITO
MIRAD
O
R
NATALIE W Y
SY C A MO RECOT TA G ECT
NORM A CT
ALTA
VISTA
PL
BEVERLY
DR
LA
PAT ERA
DR
SUDAR IO C T
EL TUACA CT
ALVISO
DR
SOMIS
R
D
CAM IN ITO
PO SADA
CALLE ORINDA
AVEN
IDA
CAFE
GARRIDO
CT
PARADISE
CI
OL D
CO
ACH
D
R
NEISH ST
NANCY ST
LAS
ESTRELLAS
CT
VIA
C
O
N
D
IO
S
AVO
C
A
D
O
PL
COR DOV A
ST
FIESTA D R
MO NT S A LA SCT
BEARDSLEY
RD
C
O
RTE
MO
NARC
A
AVENIDA
AC
AS
O
LA
PAT E RA
CT
CA LLE LO S
AC E IT UNO S
CA M A RIL LOOUT LE T
GUINDA
CT
PL UM B A GO
ST
M EL IA ST
FA IR GRO V E
CI
PASEO
DEL
CAM PO
VISTA DEL CIM A
PR E S ILL A
PL
CASTLETO
N
S
T
BU E NA
VIS TA
DR
CORTE
O
LIVAS
M
ARINE
VIEW
DR
JODY LN
VIA DECANT O
OT E RO
CT
BR
IS
T
E
R
PA
R
K
C
T
TO
W
N
FO
R
E
ST
C
T
CANO PY DR
D
AV
E
N
P
O
R
T
S
T
R
IENTE
ST
FA
IRW
AY
CT
S P RING P A RK R D
RA
M
ONA
D
R
AVO
CA
DO
C
T
VALE
N
C
IA
DR
C OR TE TIARA
COTTA
GES
CT
WICK FO RD P L
PALA
VISTA
VILLAGE
AT THE
PARK
DR
LA S
TUE R O
CT
TABOR
CI
TRUENO
AV
CA M INOLAPO S A DA
SU E NOCT
CAL LADO
ST
CALLE
BRISA
ROS A DACT
VIA
F RESCO
VIA
PAJARO
LOP A COCT
CA LLECO RVA
VA NITA
PL
ALO HA
ST
WAY S IDE
C I
RE TIROCT
H
IG
HLAN
D
H
ILLS
RD
CA LLE
AC OP A DA
CA LLE
ROC A S
AZ A LE A
CT
CAL LE
AUR OR A
TAM ARIX
ST
HYA CINT H
S T
AL
CAMARILLO
DR
BEVERLY
CI
DR
ANACAPA
DR
ENCINO AV
CAR
M
EN
DR
VENT URA BL
VENT URA BL
W. VENT UR A BL
VALL EY VISTA DR
W Y
DA
WS
ON
DR
O
AKS
C
AM
IN
O
R
U
IZ
O
V
E
R
LA
N
D
R
D
FLYNN
RD
FLYN
N
RD
FLYNN
RD
AL
OS
TA
DR
W
AL
K
E
R
A
V
B
RENTLY
AV
M
O
B
IL
A
V
M
O
BIL
AV
LY
ND
H U RST AV
HIG
H
LA
N
D D R
HIGH LA N D DR
ANACAPA
DR
L
A
N
TA
NA
ST
LANTAN
A
S
T
CHAPEL
DR
V IA T E RR AS O L
AV O CA DO P L
PONDEROSA
PONDEROSA
DR
DA ILY DR
DR
Al ley 16
Alle y 20
A
lley
19 A
lle
y
1 8
A
L
1 7
TAHQU IT ZDR
PA
R
K
C
OTTA
G
E
P
L
GA Z E B O L N
AR B OR S T
VILLAGE COMMONS BL
DA ILY DR
DA ILY DR
DAILY
D
R
SP
R
IN
G
O
A
K
R
D
MIRA M A R ST
ADO HR L N
NORT H LO OP DR
EA S T L OO P D R
WE S T LO OP DR
FIRE ST AT IO N
W. VENTURABL
WILLO WGLE N CTB
LO
O
M FIELD
P
L
ELM
C
O
TTAG
E
C
T
BR EEZY DR
D USK DR
SPRINGVILLE
DR
FLYNN
RD
FLYN
N
RD
FLYNN
RD
R
O
W
L
A
N
D
AV
RO WL AND AV
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
TO WNS IT E P RO ME N A DE
5TH
ST
CA LIS TO GA R D
WEST PARK
CT
STERLING
HILLSDR
PONDEROSA
BEDFO
RD
DR
!(
!(!(
!(
!(!( !(
!(
!(
!(!(
!(
!(!( !(
!(
!(
!( !(
!(
!(
!(!( !(!(
!(
!( !(!( !(!( !(!( !(!(
!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !( !( !(!( !( !( !( !(
!(!(
!(!(
!(!(
!( !(!(
!(
!(
!(
!( !(!(
!(!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(
!(
!(
!( !(!(
!(!( !(!( !(!( !(!( !(!( !(!( !( !(!(
!(
!(
!(
!(!( !(
!(!(
!(
!(!(
!(
!(!(
!(
!(!( !( !(
!( !(
!(
!(!( !(
!(!(!(!(!(
!(
!( !(!(
!( !( !(!( !(!(
!(
!(
!(!(
!(!(
!(!(!(
!(
!(
!(!( !(!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(!(!(!(
!(
!(
!(!(
!(
!(!(!(
!(!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(
!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(
!(!(!(
!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!( !( !(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!( !(
!(!(!( !(
!(
!(
!(
!(
!(!( !(
!( !(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(!(
!( !(
!(
!( !(
!(!(
!(
!(!(
!(!(
!(!(
!(!(!(!(!(!(!(!(
!(!(
!( !(
!(
!(
!(!(
!(!(
!(!( !(!(
!(!(
!(!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(!( !(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(!(!(!(
!(!(
!(
!(!(
!(!(
!(
!(!(
!(
!( !(
!(
!(
!(
!( !(
!(
!(
!(
!(!(!(!(
!(
!(
!(!(
!(
!(!(!(!(!(
!(!(!(!(!(
!(
!(!(!(!(!(!(
!(!(!(!(!(
!(
!(!( !(!(
!(
!(
!(
!(
!(
!(
!(!(!( !(
!(
!(!(
!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(!(
!(
!(
!(!(
!(!(!(!(!(!(!(
!(!(
!( !(!(!( !(!(
!(
!(!(
!(!(!(!(!(!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(!(!(
!(!(!(
!( !(!(!( !(!(
!(
!(!(
!(
!(
!(
!(
!( !(
!(!(!(
!(!(
!(!(
!(!(
!(
!(!(!(!(!(!(!(
!(!(!(!(
!(
!(
!(
!(
!(!(
!(!(!(!(!(!(
!(!( !(
!(
!(!(
!(
!(
!(
!(
!( !(
!( !(
!( !(
!( !(
!(!(
!(!(
!( !( !(
!(
!(
!(
!(
!(
!(!(!(
!(!(!(!(
!(!(
!(!(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!( !(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(!(!(!(!( !(!(!(
!(
!(
!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!( !(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !(!(
!(
!(!(
!(!(
!(!(!(!(
!( !(!(!( !(
!(!(!(!(!(!(!( !(!(!(!( !(
!(
!(!(
!(
!(
!(!(
!(
!(
!(!(!(
!( !(!(
!(
!(
!(
!(
!( !(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(!( !(!(!(
!(
!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!( !(
!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(!(
!(!(!(!(!(
!( !(!( !(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(
!(
!(!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(!(
!(
!(
!( !(!(
!(
!(
!( !(!(!(!(
!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(!(
!(
!(
!(!(!(!(!(
!(!(!(!(!(!(!(!(!(!(!(
!(!(!( !(!(!(!(!(!(!(!(!(!(!(!(
!(!(!(!(!(!(!(!( !(!(!(!(!(!(!(!(!(!(!(
!(
!(
!(
!(
!(!(!(!(!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !( !( !( !( !( !(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!( !(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
329
328
327
326
321
323
325
321
322 214
215
216
218
219
211
213
105
101
101
102
108
107
106
103
104
433
330433
440
440
439
438
432
434
435
436
437
440
440
212
110
431
441
109
101
441
441
441
441
220R
324
104
217
217
220
220
101
105
108
321R
321R
321R
441
442
102
432
¯
Scale: 1" = 2,000'
Prepared by Information Systems Division
THIS MAP WAS CREATED BY THE CITY OF C AMARILLO GEOGRAPHIC INFORMATION SYSTEM, WHICH IS DESIGNED AND OPERATED SOLELY FOR THE CONVENIENCE OF T HE CITY AND RELATED PUBLIC AGEN CIES.
THE CITY DOES NOT WARRANT THE ACCURACY OF TH IS MAP, AND NO DECISION INVOLVING A RISK OF ECONOMIC LOSS OR PHYSICAL INJURY SHOULD BE MADE IN RELIANCE THEREON.
Thursday, February 8, 2024
Document Path: G:\CamarilloGIS\Projects\PublicWorks\WATER\Water Meter Routes\AMR_MeterLocations\Water Meter Routes_Feb2024.mxd Legend
!( AMR Meter Retrofit
AMR Meter Retrofit Areas
Cycle 1
Cycle 2
220R (cycle 2 radio read)
Cycle 3
321R (cycle 3 radio read)321R
Cycle 4
Cycle 4 route 441 & 442
Parcels
220R
City boundary
City of Camarillo
Water Meter AMI - YEAR 3
YEAR 3 REPLACEMENT SCHEDULE:
1. Replace 2" meters in Cycles 1, 3, and 4
2. Replace all 3"-6" Meters in the City
- Indicates 2" meters to be replaced
Note: Cycles 6 and 7 are spread throughout the City.
APPENDIX
WT-5080
APPENDIX B – SUMMARY OF ASSETS FOR NETWORK
INFRASTRUCTURE
1. Summary (11 pages)
Page | 1
Appendix B – Summary of Available Assets for Network Infrastructure
This report has the list of elevated assets, both existing and City parcels where a pole can be set, and Appendix A – Service Locations, which contains the service addresses for all existing water meters in Camarillo, CA. This data should support the propagation analysis for an AMI network which is required to cover 100% of all metered accounts. It is the City’s preference to attach network equipment to existing tanks and towers, so existing assets should be leveraged as much as possible prior to suggesting additional infrastructure be added. Below is a map indicating the City service boundaries.
Page | 2
City of Camarillo Elevated Assets
The assets in the table above are presented below individually with pictures for further reference on available attachment options and for consideration of various mounting capabilities.
1. Desalter, Las Posas Rd and Ponderosa Dr. Camarillo, CA
Latitude: 34.244129
Longitude: -119.010869
Asset Height: 50’
Elevation: 207’
Site ID Street Address Latitude Longitude Asset Height Elevation Desalter Las Posas Rd and Ponderosa Dr 34.244129 -119.010869 50’ 207’ Reservoir #1 1858 Calle Alberca 34.237880 -119.066213 40’ 348’ Reservoir #2 2913 Antonio Dr 34.247091 -119.023934 30’ 271’ Reservoir #3 281 S Glenn Dr 34.213169 -119.041010 32’ 127’ Reservoir #4 2011 Grandview Dr 34.214612 -119.044103 87’ 210’ Reservoir #5 790 Via Zamora 34.226623 -119.086245 20’ 302’ Well 3 515 Eubanks St 34.208082 -119.082342 45’ 64’
WWTP 150 Howard Rd 34.195160 -119.002713 50’ 93’
Page | 3
2. Reservoir #1, 1858 Calle Alberca, Camarillo, CA
Latitude: 34.237880
Longitude: -119.066213
Asset Height: 4 0’
Elevation: 348’
Page | 4
3. Reservoir #2, 2913 Antonio Dr, Camarillo, CA
Latitude: 34.247091
Longitude: -119.023934
Asset Height: 3 0’
Elevation: 271’
Page | 5
4. Reservoir #3, 281 S Glenn Dr, Camarillo, CA
Latitude: 34.213169
Longitude: -119.041010
Asset Height: 32’
Elevation: 127’
Page | 6
5. Reservoir #4, 2011 Grandview Dr. Camarillo, CA
Latitude: 34.214612
Longitude: -119.044103
Asset Height: 87’
Elevation: 210’
Page | 7
6. Reservoir #5, 790 Via Zamora, Camarillo, CA
Latitude: 34.226623
Longitude: -119.086245
Asset Height: 2 0’
Elevation: 302’
Page | 8
7. Well 3, 515 Eubanks St, Camarillo, CA
Latitude: 34.208082
Longitude: -119.082342
Asset Height: 45’
Elevation: 64’
Page | 9
8. WWTP, 150 Howard Rd, Camarillo, CA
Latitude: 34.195160
Longitude: -119.002713
Asset Height: 5 0’
Elevation: 93’
Page | 10
City Owned Pa rcels
Site ID Street Address Latitude Longitude Height (ft) Elevation (ft) Beardsley Pump Station BEARDSLEY RD. N/E OF WRIGHT RD. 34.241761 -119.09781 25 148 Bradford PRV/Turnout 3 CORNER OF BRADFORD AVE. AND EARL JOSEPH DR. 34.228668 -119.071279 6 131 JOSE REG STATION 1687 JOSE AVE 34.234634 -119.018789 10 185 KENDALL REG STATION 2958 DWIGHT AVE 34.230476 -119.030404 10 168 LEXINGTON REG STATION 1594 LEXINGTON CT 34.234352 -119.03838 5 164 ROSEWOOD REG STATION 1290 ROSEWOOD AVE 34.230812 -119.061901 12 142 Spanish Hills PRV 1 1650 1/2 CALLE TIERRA VISTA 34.234077 -119.090231 5 157 Spanish Hills PRV 2 1384 1/2 AVENIDA DE APRISA 34.231638 -119.099404 0 184 Spanish Hills Pump Station 717 CAMINO TIERRA SANTA 34.225029 -119.086423 20 236 Sterling Hills PRV CORNER OF AVENIDA DE APRISA AND AVENIDA DE AUT 34.235816 -119.090698 0 121 Turnout 1 ACROSS FROM 3901 LAS POSAS RD. 34.241261 -119.018788 15 198 Turnout 2 ACROSS FROM 1935 LAS POSAS RD. 34.235087 -119.04454 10 177 Turnout 4 720 LAS POSAS RD 34.231099 -119.060735 10 142 Turnout 5 600 VIA ZAMORA 34.225374 -119.086358 15 259
Turnout 6 N SIDE OF LAS POSAS 150' W/O CHARTER OAK DR. 34.237181 -119.036795 12 198 Turnout 8 3495 MISSION OAKS BLVD 34.216385 -119.02154 12 144 Well A 3901 LAS POSAS 34.241821 -119.018973 20 198
Well B 2303 ANTONIO AVE 34.244385 -119.019406 15 201
Well D 217 E. DAILY DR 34.219808 -119.073795 8 91
APPENDIX
WT-5080
APPENDIX C – NETWORK SITE PLAN TEMPLATE
1. Network Site Plan (10 pages)