Cities Index.
Agenda, regular meeting

Campbell City Council
September 19, 2023

Document
Agenda, regular meeting
Meeting
September 19, 2023
Body
Campbell City Council
Pages
49
Original file
77.7 MB
Text extracted from the city's file for reading and search. Open the original on www.campbellca.gov. That file is the official record.

Cut semi-circular hole 1/4” x 2-1/2” from rhs.

Spacer opening 9” x 6”
1/16” acrylic spacer measuring 9” x 1/2”
Install Design Intent: Glass Mount, top view5
R1: Room ID, public w/events
3/4” + Braille
R1.206
9” x 11-1/2“

COMMUNITY
ROOM A
Event line 1
Event line 2
Event line 3
R1.211
9” x 11-1/2“

COMMUNITY
ROOM B
Event line 1
Event line 2
Event line 3

COMMUNITY
ROOM A
Event line 1
Event line 2
Event line 3
Sign core
Front face
Diffuser vinyl

15.b
Packet Pg. 545
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
35 R2
R2: Room ID sign, public
Installation scenario(s): Wall/glass mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1 3-D View2
R2: Room ID, public
3/4” X-height, Tactile + Braille
CHILDREN’S
ROOM
CHILDREN’S
ROOM
R2: Room ID, public
3/4” X-height, Tactile + Braille
CHILDREN’S
ROOM
CHILDREN’S
ROOM
9”
6-1/4”
Front face
1-1/4” radius corner
Syntax tactile raised min 1/32”
& screen printed White
on first surface.
3/4”
1-1/2”
2”
3/4”
1-1/4” radius corner3/4”
1/2”
3/4”
1/2” Contracted Grade 2 Braille
Signs to conform to California Building Code
Side, 20% scale3
Installation, Wall Mount, top view4
R1: Room ID, public w/events
3/4” + Braille
R1.206
9” x 11-1/2“

COMMUNITY
ROOM A
Event line 1
Event line 2
Event line 3
R1.211
9” x 11-1/2“

COMMUNITY
ROOM B
Event line 1
Event line 2
Event line 3

COMMUNITY
ROOM A
Event line 1
Event line 2
Event line 3
Sign studded to wall
Front face
Install Design Intent: Glass Mount, top view5
R1: Room ID, public w/events
3/4” + Braille
R1.206
9” x 11-1/2“

COMMUNITY
ROOM A
Event line 1
Event line 2
Event line 3
R1.211
9” x 11-1/2“

COMMUNITY
ROOM B
Event line 1
Event line 2
Event line 3

COMMUNITY
ROOM A
Event line 1
Event line 2
Event line 3
Sign core
Front face
Diffuser vinyl
R2: Room ID, public
3/4” X-height, Tactile + Braille
CHILDREN’S
ROOM
CHILDREN’S
ROOM
Right side view
3/4”1/8”
1/8” acrylic non-glare P99 with smoothed edges
and eased corners. Reverse surface painted PMS
Black 7.

Attached to sign core using adhesive.

Graphics screen printed on first surface.

Sign core fabricated from vendor recom-
mended material. Visible surface smoothed
and painted Oatmeal and Matthews Clear
Coat.

15.b
Packet Pg. 546
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
36 R3
R3: Room ID sign, staff
Installation scenario(s): Wall/glass mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1 3-D View2
R3: Room ID, staff space
3/4” X-height, Tactile + Braille

ELECTRICAL
ROOM

ELECTRICAL
ROOM
R3: Room ID, staff space
3/4” X-height, Tactile + Braille

ELECTRICAL
ROOM

ELECTRICAL
ROOM
9”
6-1/4”
Front face
1-1/4” radius corner
Syntax tactile raised min 1/32”
& screen printed White
on first surface.
3/4”
1-1/2”
2”
3/4”
1-1/4” radius corner3/4”
1/2”
3/4”
1/2” Contracted Grade 2 Braille
Signs to conform to California Building Code
Side, 20% scale3
Installation, Wall Mount, top view4
R3: Room ID, staff space
3/4” X-height, Tactile + Braille

ELECTRICAL
ROOM

ELECTRICAL
ROOM
Sign attached to wall
using adhesive/silicone
Front face
Install Design Intent: Glass Mount, top view5
R3: Room ID, staff space
3/4” X-height, Tactile + Braille

ELECTRICAL
ROOM

ELECTRICAL
ROOM
Front face
Diffuser vinyl
R3: Room ID, staff space
3/4” X-height, Tactile + Braille

ELECTRICAL
ROOM

ELECTRICAL
ROOM
Side view
1/8”
1/8” acrylic non-glare P99 with smoothed edges
and eased corners. Reverse surface painted PMS
Black 7.

Graphics screen printed on first surface.

15.b
Packet Pg. 547
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
37 R4
R4: Office ID
Installation scenario(s): Wall/glass mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1 3-D View2
R4: Office ID
3/4” X-height, Tactile + Braille
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
R4: Office ID
3/4” X-height, Tactile + Braille
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
10”
Front face
1-1/4” radius corner
Syntax tactile raised min 1/32”
& screen printed White
on first surface.
3/4” 3/4”
8-1/2” x 6” masked window
for viewing printed white
cardstock insert. Text on
cardstock tbd.
1-1/4” radius corner
Window for paper insert
Spacers to support printed insert
measuring 10” x 6-3/4”
Dashed outline indicates
printed insert measuring
10” x 6-3/4”
Contracted Grade 2 Braille
Signs to conform to California Building Code
6”
2-1/8”
3/4”
3/4”
1/2”
1”
11”

15.b
Packet Pg. 548
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
38 R4
R4: Office ID
Side, 20% scale3
R4: Office ID
3/4” X-height, Tactile + Braille
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
Right side viewLeft side view
Installation, Wall Mount, top view4
R4: Office ID
3/4” X-height, Tactile + Braille
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
Sign core
Sign studded to wall Wall
Front face
1/8” 3/4”
1/16” spacer
1/8”3/4”
1/16” spacer
1/8” acrylic non-glare P99 with smoothed edges
and eased corners. Reverse surface painted PMS
Black 7.

Attached to 1/16” spacer using adhesive.

Graphics screen printed on first surface.

Sign core fabricated from vendor recom-
mended material. Visible surface smoothed
and painted Oatmeal and Matthews Clear
Coat.
1/16” acrylic spacer measuring 10” x 3-1/2”
Thumb hole to be cut into 1/4” sign core.

Cut semi-circular hole 1/4” x 2-1/2” from rhs.

Spacer opening 10” x 7”
1/16” acrylic spacer measuring 10” x 1/2”
Install Design Intent: Glass Mount, top view5
R4: Office ID
3/4” X-height, Tactile + Braille
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
Title 1
Name 1
Optional title 2
Optional name 2
OFFICE
Sign core
Front face
Diffuser vinyl

15.b
Packet Pg. 549
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
39 R5: Exit door route
3/4” X-height, Tactile + Braille
EXIT
EXIT
R5
R5: Exit door route
Installation scenario(s): Wall/glass mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 50% scale1 3-D View2
R5: Exit door route
3/4” X-height, Tactile + Braille
EXIT
EXIT
R5: Exit door route
3/4” X-height, Tactile + Braille
EXIT
EXIT
Variable: 3-1/2” - 8-1/2”
Vairable:
4” - 6-1/2”
Front face
Syntax tactile raised min 1/32”
& screen printed White
on first surface.

Min 1/2”
3/4”
1-5/8”
1/2”
1/2”
Contracted Grade 2 Braille
Signs to conform to California Building Code
Side, 50% scale3
Installation, Wall Mount, top view4
R5: Exit door route
3/4” X-height, Tactile + Braille
EXIT
EXIT
Sign attached to wall
using adhesive/silicone
Front face
Install Design Intent: Glass Mount, top view5
Front face
Diffuser vinyl
R5: Exit door route
3/4” X-height, Tactile + Braille
EXIT
EXIT
Side view
1/8”
1/8” acrylic non-glare P99 with smoothed edges.

Reverse surface painted PMS Black 7
Graphics screen printed on first surface.

Eased corners for safety

15.b
Packet Pg. 550
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
40 R6: Room ID, restroom
3/4” X-height, Tactile + Braille
FAMILY
FAMILY
R6
R6: Room ID, restroom
Installation scenario(s): Wall mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1 3-D View2
R6: Room ID, restroom
3/4” X-height, Tactile + Braille
FAMILY
FAMILY
Front face
Side, 20% scale3
Installation, Wall Mount, top view4
Sign attached to wall
using adhesive/
silicone/studs
Front face
R6: Room ID, restroom
3/4” X-height, Tactile + Braille
FAMILY
FAMILY
Side view
1-1/4” radius corner
3/4”1/8”
1/8” acrylic non-glare P99 with smoothed edges
and eased corners. Reverse surface painted PMS
Black 7.

Attached to sign core using adhesive.

Graphics screen printed on first surface.

Sign core fabricated from vendor recom-
mended material. Visible surface smoothed
and painted Oatmeal and Matthews Clear
Coat.

R6: Room ID, restroom
3/4” X-height, Tactile + Braille
FAMILY
FAMILY
Varies
Varies
1-1/4” radius corner
Syntax tactile raised min 1/32”
& screen printed White on first surface.
1-1/8”
1/2”
1-5/8”
1-1/8”
Varies
2-3/4”
3/4”
7/8”
Contracted Grade 2 Braille
Signs to conform to Title 24 California Building Code
2-3/4”
1-3/4”
Symbols tactile raised min 1/32”
& screen printed White on first surface.
1/2”

15.b
Packet Pg. 551
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
41 R7
R7: Door ID, restroom
Installation scenario(s): Door mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Faces, 20% scale1
3-D Views2
Front face: Men
Corners, min radius 1/8”
12” equilateral
12”
Corners, min radius 1/8”
4-5/8”
Signs to conform to Title 24 California Building Code
Symbol screen printed
White on first surface.

All edges smoothed for safety
Corners, min radius 1/8”
All edges smoothed for safetyAll edges smoothed for safety Front face: Women Front face: Restroom, Family
3-7/8”
1-7/8”
6-1/4”
2-7/8”
2-7/8”
center
12” 4-1/4”
3-3/4”
3”
center
Symbol screen printed
White on first surface.

Symbol screen printed
PMS Black 7 on first surface.
1”
Corners, min radius 1/8”

15.b
Packet Pg. 552
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
42 R7
R7: Door ID, restroom
Installation, Door Mount, top view4Side, 20% scale3
Women/men
side view
1/4”
1/4” acrylic non-glare P99
with smoothed edges.

Reverse surface painted
PMS Black 7.

White graphics screen
printed on first surface.

Restroom/family
side view
1/4”
1/4”
1/4” acrylic non-glare P99
with smoothed edges.

Reverse surface painted
PMS Black 7.
1/4” acrylic non-glare P99 with
smoothed edges. Reverse surface
painted White.

Graphics screen printed on first
surface PMS Black 7.

Sign attached to door
using adhesive/
silicone
Front face

15.b
Packet Pg. 553
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
43 R8
R8: Symbol of access, vinyl
Installation scenario(s): Glass mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1
R8: Symbol of access
6”
6”
Front face
3-5/8”
Install Design Intent: Glass Mount, top view2
Vinyl sign with adhesive backing
Printed 3M vinyl with adhesive backing
R9: Prohibition sign
5/8” X-height
R9.002
6” x 9”
No smoking
within 30 feet
of building
No smoking
within 30 feet
of building

15.b
Packet Pg. 554
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
44 R9
R9: Prohibition sign, vinyl
Installation scenario(s): Glass mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1
R9: Prohibition sign
5/8” X-height
R9.002
6” x 9”
No smoking
within 30 feet
of building
No smoking
within 30 feet
of building
6”
9”
Front face
Syntax Bold
1/2”
7/8”
3-3/8”
1/2”
5/8”
R9: Prohibition sign
5/8” X-height
R9.002
6” x 9”
No smoking
within 30 feet
of building
No smoking
within 30 feet
of building
Install Design Intent: Glass Mount, top view2
Vinyl sign with adhesive backing
3/4”
Printed 3M vinyl with adhesive backing

15.b
Packet Pg. 555
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
45 R10: Assistive listening
3/4” X-height

ASSISTIVE LISTENING

SYSTEM AVAILABLE

ASSISTIVE LISTENING

SYSTEM AVAILABLE
R10: Assistive listening
3/4” X-height

ASSISTIVE LISTENING

SYSTEM AVAILABLE

ASSISTIVE LISTENING

SYSTEM AVAILABLE
R10
R10: Assistive listening
Installation scenario(s): Wall mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1 3-D View2
R10: Assistive listening
3/4” X-height

ASSISTIVE LISTENING

SYSTEM AVAILABLE

ASSISTIVE LISTENING

SYSTEM AVAILABLE
R10: Assistive listening
3/4” X-height

ASSISTIVE LISTENING

SYSTEM AVAILABLE

ASSISTIVE LISTENING

SYSTEM AVAILABLE
15-1/2”
5-1/2”
Front face
1-1/4” radius corner
Syntax tactile raised min 1/32”
& screen printed White
on first surface.
3/4”
1”
1-/2”
3/4”
1-1/4” radius corner
3/4”
1/2”
3/4”
1/2”
Contracted Grade 2 Braille
Signs to conform to California Building Code
Side, 20% scale3 Installation, Wall Mount, top view4
Sign attached to wall
using adhesive/silicone
Front face
Side view
1/8”
1/8” acrylic non-glare P99 with smoothed edges
and eased corners. Reverse surface painted PMS
Black 7.

Graphics screen printed on first surface.

Symbol screen printed
White on first surface.
3-1/4”
3-1/4”

15.b
Packet Pg. 556
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
46 FE
FE: Fire escape lettering, vinyl
Installation scenario(s): Glass mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1
FE: Fire escape lettering, vinyl
1” X-height

FIRE DOOR, KEEP CLOSED

ALARM WILL SOUND

FIRE DOOR, KEEP CLOSED

ALARM WILL SOUND
16”
2-7/8”
Front face
Syntax Bold
Pantone 355
1”
FE: Fire escape lettering, vinyl
1” X-height

FIRE DOOR, KEEP CLOSED

ALARM WILL SOUND

FIRE DOOR, KEEP CLOSED

ALARM WILL SOUND
Install Design Intent: Door Mount, top view2
Vinyl cut lettering with adhesive backing
1”
Printed 3M vinyl cut letters
with adhesive backing
7/8”

15.b
Packet Pg. 557
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
47 CF
CF: Case of fire sign
Installation scenario(s): Wall mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1
9”
5/8”
8-1/2”
Front face
7/8”
Single-sided side view, 20% scale3
In Case Of Fire,
Use Stairway
Do Not Use Elevator
CF: Case of fire
5/8” X-height
In Case Of Fire,
Use Stairway
Do Not Use Elevator
1”
2-3/8”
In Case Of Fire,
Use Stairway
Do Not Use Elevator
CF: Case of fire
5/8” X-height
In Case Of Fire,
Use Stairway
Do Not Use Elevator
Reverse surface paint,
PMS Black 7
Eased corners for safety
Syntax Bold screen printed
White on first surface.

Symbol screen printed
White on first surface.
1”
1”
7/8”
In Case Of Fire,
Use Stairway
Do Not Use Elevator
CF: Case of fire
5/8” X-height
In Case Of Fire,
Use Stairway
Do Not Use Elevator
Install Design Intent: Wall Mount, top view4
Sign attached to wall
using silicone adhesive
Wall
Front face
5/8”
Side view
1/8”
1/8” acrylic non-glare P99 with smoothed edges.

Reverse surface painted PMS Black 7
Graphics screen printed on first surface.
3-D View2
In Case Of Fire,
Use Stairway
Do Not Use Elevator
CF: Case of fire
5/8” X-height
In Case Of Fire,
Use Stairway
Do Not Use Elevator

15.b
Packet Pg. 558
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
48 FEC
FEC: Fire extinguisher cabinet sign
Installation scenario(s): Flag mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Faces, 20% scale1
4-1/4”
1”
6”
Front face and
rear face
Single-sided side view, 20% scale3
FEC: Fire extinguisher cabinet ID
4”
FEC: Fire extinguisher cabinet ID
Surface paint Pantone 186
Symbol screen printed
White on first surface.

FEC: Fire extinguisher cabinet ID
Install Design Intent: Wall Mount, top view4
Side view
3/4”
3/4” acrylic non-glare P99 with smoothed edges.

Surface painted Pantone 186 faces and edges
White graphics screen printed on first surface.
3-D View2
FEC: Fire extinguisher cabinet ID
Wall
Rear face
Front face
Sign studded to wall
1”

15.b
Packet Pg. 559
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
49 FEM: Fire evacuation map

IN CASE OF FIRE, USE STAIRWAY,

DO NOT USE ELEVATOR
Alarm will sound as a beeping horn and strobe lights will flash.

CALL 911 - FIRE/POLICE/MEDICAL

PERSONS WITH DISABILITIES
Call 911, report location. Proceed to nearest stairwell & await assistance.

EVACUATION MAP Floor 2
You are here Exit route Fire extinguisher
Harrison Avenue
Grant Street
Civic Center Drive
EXIT
EXIT
EXIT
North

IN CASE OF FIRE, USE STAIRWAY,

DO NOT USE ELEVATOR
Alarm will sound as a beeping horn and strobe lights will flash.

CALL 911 - FIRE/POLICE/MEDICAL

PERSONS WITH DISABILITIES
Call 911, report location. Proceed to nearest stairwell & await assistance.

EVACUATION MAP Floor 2
You are here Exit route Fire extinguisher
Harrison Avenue
Grant Street
Civic Center Drive
EXIT
EXIT
EXIT
North
FEM
FEM: Fire evacuation map
Installation scenario(s): Wall mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 30% scale1
16”
21”
FEM: Fire evacuation map

IN CASE OF FIRE, USE STAIRWAY,

DO NOT USE ELEVATOR
Alarm will sound as a beeping horn and strobe lights will flash.

CALL 911 - FIRE/POLICE/MEDICAL

PERSONS WITH DISABILITIES
Call 911, report location. Proceed to nearest stairwell & await assistance.

EVACUATION MAP Floor 2
You are here Exit route Fire extinguisher
Harrison Avenue
Grant Street
Civic Center Drive
EXIT
EXIT
EXIT
North

IN CASE OF FIRE, USE STAIRWAY,

DO NOT USE ELEVATOR
Alarm will sound as a beeping horn and strobe lights will flash.

CALL 911 - FIRE/POLICE/MEDICAL

PERSONS WITH DISABILITIES
Call 911, report location. Proceed to nearest stairwell & await assistance.

EVACUATION MAP Floor 2
You are here Exit route Fire extinguisher
Harrison Avenue
Grant Street
Civic Center Drive
EXIT
EXIT
EXIT
North
1/8”
1/8” acrylic non-glare P99 sign face with smoothed edges and eased corners.

Single-sided side view, 30% scale2
16” x 21” digital print applied subsurface to sign face using optically clear adhesive.
1/8” acrylic non-glare P99 sign backer with smoothed edges and eased corners.
1/8”
X-height: 3/4”
X-height: 1/4”
You are here symbol height: 5/8”
FEC symbol height: 1/2”
X-height: 5/8”
X-height: 5/8”
X-height: 1/4”
X-height: 3/8”
X-height: 1/2”
X-height: 1/4” (language to be confirmed)
X-height: 1/4”

15.b
Packet Pg. 560
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
50 FL
FL: Floor level sign
Installation scenario(s): Wall mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1
8”
1”
12-1/2”
Front face
7/8”
Single-sided side view, 20% scale3
FL: Floor level ID
1” & 2” X-heights, Tactile + Braille

STAIR B

NO ROOF
ACCESS
2 STAIR B

NO ROOF
ACCESS
2 2”
1”
FL: Floor level ID
1” & 2” X-heights, Tactile + Braille

STAIR B

NO ROOF
ACCESS
2 STAIR B

NO ROOF
ACCESS
2 Reverse surface paint,
PMS Black 7
1/8” radius corners for safety
1”
1-3/8”
7/8”
FL: Floor level ID
1” & 2” X-heights, Tactile + Braille

STAIR B

NO ROOF
ACCESS
2 STAIR B

NO ROOF
ACCESS
2 Install Design Intent: Wall Mount, top view4
Sign attached to wall
using silicone adhesive
Wall
Front face
1/2”
1/8”
1/8” acrylic non-glare P99 with smoothed edges.

Reverse surface painted PMS Black 7
Graphics screen printed on first surface.
3-D View2
FL: Floor level ID
1” & 2” X-heights, Tactile + Braille

STAIR B

NO ROOF
ACCESS
2 STAIR B

NO ROOF
ACCESS
2 Syntax bold tactile raised min
1/32” & screen printed White
on first surface
Syntax tactile raised min 1/32”
& screen printed White
on first surface.

Contracted Grade 2 Braille
1/2”
Contracted Grade 2 Braille1/2”
7/8”
2-3/8”

15.b
Packet Pg. 561
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
51 R10: Assistive listening
3/4” X-height

ASSISTIVE LISTENING

SYSTEM AVAILABLE

ASSISTIVE LISTENING

SYSTEM AVAILABLE
OC: Occupancy sign
5/8” X-height
Maximum
occupancy
66 Maximum
occupancy
173
Maximum
occupancy
173
OC
OC: Occupancy
Installation scenario(s): Wall mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1 3-D View2
OC: Occupancy sign
5/8” X-height
Maximum
occupancy
66 Maximum
occupancy
173
Maximum
occupancy
173
OC: Occupancy sign
5/8” X-height
Maximum
occupancy
66 Maximum
occupancy
173
Maximum
occupancy
173
5-1/2”
5-1/2”
Front face
1-1/4” radius corner
3/4”
1-3/8”
1-3/8”
1-1/4” radius corner
5/8”
1/2”
5/8”
5/8”
Signs to conform to California Building Code
Side, 20% scale3 Installation, Wall Mount, top view4
Sign attached to wall
using adhesive/silicone
Front face
Side view
1/8”
1/8” acrylic non-glare P99 with smoothed edges
and eased corners. Reverse surface painted PMS
Black 7.

Graphics screen printed on first surface.

Syntax Bold screen printed
White on first surface.
3/4”
1/2”

15.b
Packet Pg. 562
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
52 Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
SE1
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
SE1
SE1: Stack end sign, double
Installation scenario(s): Stack-end mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1
24”
9-3/4”
1/8”
Side view, 20% scale3
1/8”
Printed digital print insert, 24” x 2-1/2”
Paint masked window: 24” x 2-1/8”
Reverse surface paint, White.

Printed laser insert, 11” x 5-1/2”
Paint masked window: 10-1/2” x 5”
Printed laser insert, 11” x 5-1/2”
Paint masked window: 10-1/2” x 5”
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
SE1
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
Sign Face: spacers and printed inserts, 20% scale2
Spacer: 1/16” clear acrylic, 24” x 3/8”
Spacer: 1/16” clear acrylic, 24” x 1/2”
Spacer: 1/16” clear acrylic, 24” x 5/8”
Spacer: 1/16” clear acrylic, 2” x 5”
Printed insert, 24” x 2-1/2”
Printed insert, 11” x 5-1/2”
Printed insert, 11” x 5-1/2”
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
SE1
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
Front lens: 1/8” P99, 24” x 9-3/4”
Edges smoothed and corners eased.

Reverse surface painted white, leaving 3 windows masked clear Backer: 1/8” P99, 24” x 9-3/4”
Edges smoothed and painted white
Sign layers assembled using adhesive or solvent weld to form one unit with three insert windows.
1/16”
10-1/2” 10-1/2”
5”

15.b
Packet Pg. 563
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
53 Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
SE2
SE2: Stack end sign, narrow
Installation scenario(s): Stack-end mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, Left, 20% scale1
8-7/8”
9-3/4”
1/8”
Side view, 20% scale4
1/8”
Printed digital print insert, 8-7/8” x 2-1/2”
Paint masked window: 8-7/8” x 2-1/8”
Reverse surface paint, White.

Printed laser insert, 8-1/4” x 5-1/2”
Paint masked window: 8” x 5”
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Sign Face: spacers and printed inserts, 20% scale3
Spacer: 1/16” clear acrylic, 8-7/8” x 3/8”
Spacer: 1/16” clear acrylic, 8-7/8” x 1/2”
Spacer: 1/16” clear acrylic, 8-7/8” x 5/8”
Spacer: 1/16” clear acrylic, 5/8” x 5”
Printed insert, 8-7/8” x 2-1/2”
Printed insert, 8-1/4” x 5-1/2”
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
SE1
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
Front lens: 1/8” P99, 8-7/8” x 9-3/4”
Edges smoothed and corners eased.

Reverse surface painted white, leaving 2 windows masked clear Backer: 1/8” P99, 8-7/8” x 9-3/4”
Edges smoothed and painted white
Sign layers assembled using adhesive or solvent weld to form one unit with two insert windows.
1/16”
8”
5”
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Sign Face, Right, 20% scale2
8-7/8”
9-3/4”
Printed digital print insert, 8-7/8” x 2-1/2”
Paint masked window: 8-7/8” x 2-1/8”
Reverse surface paint, White.

Printed laser insert, 8-1/4” x 5-1/2”
Paint masked window: 8” x 5”8”
5”

15.b
Packet Pg. 564
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
54 Collection Name
SE3, L
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
SE3, R
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Collection Name
SE3, L
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
SE3, R
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
SE3
SE3: Stack end sign, single
Installation scenario(s): Stack-end mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, Left, 20% scale1
12”
9-3/4”
1/8”
Side view, 20% scale4
1/8”
Printed digital print insert, 12” x 2-1/2”
Paint masked window: 12” x 2-1/8”
Reverse surface paint, White.

Printed laser insert, 11” x 5-1/2”
Paint masked window: 10-1/2” x 5”
Collection Name
SE3, L
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
SE3, R
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Collection Name
Sign Face: spacers and printed inserts, 20% scale3
Spacer: 1/16” clear acrylic, 12” x 3/8”
Spacer: 1/16” clear acrylic, 12” x 1/2”
Spacer: 1/16” clear acrylic, 12” x 5/8”
Spacer: 1/16” clear acrylic, 1” x 5”
Printed insert, 12” x 2-1/2”
Printed insert, 11” x 5-1/2”
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
SE1
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
Line 1
Line 2
Line 3
Line 1
Line 2
Line 3
Collection Name
Front lens: 1/8” P99, 12” x 9-3/4”
Edges smoothed and corners eased.

Reverse surface painted white, leaving 2 windows masked clear Backer: 1/8” P99, 12” x 9-3/4”
Edges smoothed and painted white
Sign layers assembled using adhesive or solvent weld to form one unit with two insert windows.
1/16”
10-1/2”
5”
Sign Face, Right, 20% scale2
12”
9-3/4”
Printed digital print insert, 12” x 2-1/2”
Paint masked window: 12” x 2-1/8”
Reverse surface paint, White.

Printed laser insert, 11” x 5-1/2”
Paint masked window: 10-1/2” x 5”10-1/2”
5”

15.b
Packet Pg. 565
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
55 Collection name Collection name
Collection name Collection name
Collection name Collection name
Collection name Collection name
Collection name Collection name
Collection name Collection name
Collection name Collection name
Collection name Collection name
SV1
SV1: Shelving insert
Installation scenario(s): hand positioned within collections on shelves Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, Front, 20% scale1
11”
1/8”
Side, top and underside views, 20% scale4
1/8”
Printed laser insert, 9-7/8” x 8-1/2”
Sign Face: spacers and printed inserts, 20% scale3
Spacer: 1/16” clear acrylic, 9” x 1/2”
Spacer: 1/16” clear acrylic, 9” x 1/2”
Printed laser insert, 9-7/8” x 8-1/2”
Front lens: 1/8” P99, 10” x 9”
Edges smoothed and corners eased.

Reverse surface painted white, leaving 1 window masked clear Back lens: 1/8” P99, 10” x 9”
Edges smoothed and painted white
Reverse surface painted white, leaving 1 window masked clear Sign layers assembled using adhesive or solvent weld to form one unit with one insert window. 1/16”
10”
9”
Sign Face, Back, 20% scale2
8-1/2”
2”
Reverse surface paint masked border, 1/2” wide on three sides Collection name Collection name
Collection name Collection name
Collection name Collection name
Collection name Collection name
Spacer: 1/16” clear acrylic, 10” x 1/2”
Collection name Collection name
Collection name Collection name
Collection name Collection name
Collection name Collection name
11”
Printed laser insert, 9-7/8” x 8-1/2”
10”
9” 8-1/2”
2”
Reverse surface paint masked border, 1/2” wide on three sides Spacer: 1/16” clear acrylic, 10” x 1/2”
Spacer: 1/16” clear acrylic, 9” x 1/2”
Side Underside
Top
Unit measurements to be confirmed prior to fabrication, to ensure correct fit with shelving depth.

15.b
Packet Pg. 566
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
56 Teen Collection
Teen Collection
Teen Collection
TE1
TE1: Stack end sign, double
Installation scenario(s): Stack-end mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 20% scale1
24”
3-1/2”
1/8”
Side view, 20% scale3
1/8”
Printed digital print insert, 24” x 2-1/2”
Paint masked window: 24” x 2-1/8”
Reverse surface paint, White.

Teen Collection
Teen Collection
Teen Collection
Sign Face: spacers and printed inserts, 20% scale2
Spacer: 1/16” clear acrylic, 24” x 3/8”
Spacer: 1/16” clear acrylic, 24” x 1/2”
Printed insert, 24” x 2-1/2”
Front lens: 1/8” P99, 24” x 3-1/2”
Edges smoothed and corners eased.

Reverse surface painted white, leaving 1 window masked clear Backer: 1/8” P99, 24” x 3-1/2”
Edges smoothed and painted white
Sign layers assembled using adhesive or solvent weld to form one unit with one insert windows.
1/16”
2-1/8”
Teen Collection
Teen Collection
Teen Collection

15.b
Packet Pg. 567
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
57 C1
C1: Acrylic insert sign
Installation scenario(s): Monitor top-mounted
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face1
Right side view3Rear Face2
C1
© Wendy Wilsher 09 March 2017

1.5”
1/2” 3M clear VHB to attach to unit
L-shaped aluminium extrusion, painted satin black - 4” length x 1-1/2” height x 1/2” depth (Quantity 2) Rear face 20” x 5”: P99 clear acrylic, 3/16” gauge
Spacer 20” x 1/4”: P99 clear acrylic, 1/16” gauge.

Solvent welded (clear) to front and rear faces.

Front face 20” x 5”: P99 clear acrylic, 1/16” gauge
Spacer 20” x 1/4”: P99 clear acrylic, 1/16” gauge.

Solvent welded (clear) to front and rear faces.
5”
3M Dual Lock, black: (250 stems/inch), 3” x 1”, attached to rear sign face using integrated VHB tape 4” bracket + 5” window sign
1 set = 2 x brackets, 1 x sign
3M Dual Lock, black: (250 stems/inch), 3” x 1” , attached centrally to bracket face using integrated VHB tape Opening to hold digital inkjet print measuring 20” x 4-3/8” Right side view
Front face view
20”
5”
Rear face view
20”
5”
4”1”
4” 1”
1”
1/4”
Finished edges and corners of acrylic sign to be gently eased and polished smooth for safety Edges of aluminum to be sanded smooth for safety
C1
© Wendy Wilsher 09 March 2017

1.5”
1/2” 3M clear VHB to attach to unit
L-shaped aluminium extrusion, painted satin black - 4” length x 1-1/2” height x 1/2” depth (Quantity 2) Rear face 20” x 5”: P99 clear acrylic, 3/16” gauge
Spacer 20” x 1/4”: P99 clear acrylic, 1/16” gauge.

Solvent welded (clear) to front and rear faces.

Front face 20” x 5”: P99 clear acrylic, 1/16” gauge
Spacer 20” x 1/4”: P99 clear acrylic, 1/16” gauge.

Solvent welded (clear) to front and rear faces.
5”
3M Dual Lock, black: (250 stems/inch), 3” x 1”, attached to rear sign face using integrated VHB tape 4” bracket + 5” window sign
1 set = 2 x brackets, 1 x sign
3M Dual Lock, black: (250 stems/inch), 3” x 1”, attached centrally to bracket face using integrated VHB tape Opening to hold digital inkjet print measuring 20” x 4-3/8” Right side view
Front face view
20”
5”
Rear face view
20”
5”
4”1”
4” 1”
1”
1/4”
Finished edges and corners of acrylic sign to be gently eased and polished smooth for safety Edges of aluminum to be sanded smooth for safety
C1
© Wendy Wilsher 09 March 2017

1.5”
1/2” 3M clear VHB to attach to unit
L-shaped aluminium extrusion, painted satin black - 4” length x 1-1/2” height x 1/2” depth (Quantity 2) Rear face 20” x 5”: P99 clear acrylic, 3/16” gauge
Spacer 20” x 1/4”: P99 clear acrylic, 1/16” gauge.

Solvent welded (clear) to front and rear faces.

Front face 20” x 5”: P99 clear acrylic, 1/16” gauge
Spacer 20” x 1/4”: P99 clear acrylic, 1/16” gauge.

Solvent welded (clear) to front and rear faces.
5”
3M Dual Lock, black: (250 stems/inch), 3” x 1”, attached to rear sign face using integrated VHB tape 4” bracket + 5” window sign
1 set = 2 x brackets, 1 x sign
3M Dual Lock, black: (250 stems/inch), 3” x 1”, attached centrally to bracket face using integrated VHB tape Opening to hold digital inkjet print measuring 20” x 4-3/8” Right side view
Front face view
20”
5”
Rear face view
20”
5”
4”1”
4” 1”
1”
1/4”
Finished edges and corners of acrylic sign to be gently eased and polished smooth for safety Edges of aluminum to be sanded smooth for safety

15.b
Packet Pg. 568
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Project: Campbell Library Wayfinding
Document: Design Guidelines
Phase: Final Art
Issue: V2 Bid Set
Date: 14 April 2023
58 C2
C2: Printer unit sign
Installation scenario(s): Freestanding
Typical visual shown, refer to message schedule for legends, variations and dimensions. Illustrator vector artwork provided for all variations.

Sign Face, 10% scale1 Single-sided side view, 10% scale2 Copying
Black & white, or color prints
Letter size: 8-1/2” x 11”
Single-sided
Black & white: 15 cents
Color: 20 cents
Black & white, or color prints
Letter size: 8-1/2” x 11”
Legal size: 8-1/2” x 14”
Tabloid size: 11” x 17”
CopyingPrinting
Single or double-sided
Black & white: 15 cents
Color: 20 cents
Copying
Black & white, or color prints
Letter size: 8-1/2” x 11”
Single-sided
Black & white: 15 cents
Color: 20 cents
Black & white, or color prints
Letter size: 8-1/2” x 11”
Legal size: 8-1/2” x 14”
Tabloid size: 11” x 17”
CopyingPrinting
Single or double-sided
Black & white: 15 cents
Color: 20 cents
12”
Weighted base, 24” wide
Fabricator to engineer depth and height
for stability.

Weighted base to slide underneath MFD printer
50”
8”
1”
Surface painted Pantone 634.
24” x 12” 1/8” P99, attached to unit
top (1”) and bottom (3”) leaving
24” x 8” clear window for
24” x 7-7/8” inkjet digital
printed insert.
3” or as fabricator advises24”
DESIGN INTENT: Fabrication and engineering to be discussed and solved with chosen fabricator.

Internal frame structure clad
in fabricator recommended panels, possibly alumi-
num.

All corners to be filled, tidied and smoothed for safety.

Unit to be primed and surface painted, and finished
with Matthews clear coat.

15.b
Packet Pg. 569
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) App VI
Appendix VI:

PG&E Site Drawing

15.b
Packet Pg. 570
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) DIST. MAP# H 16-16
DIST CIRCUT - EL PATIO 1116
SSD SW. 8577
"B" INS. DIST.

LIGHT LOADING
DIST. CIRCUT MAP# G-15-23

REMOVABLE BARRIER POST

APPLICANT TO PROVIDE & INSTALL

FIXED BARRIER POST

BARRIER POSTS TO BE
MAINTAIN 8'-0" UNOBSTRUCTED WORKING
CLEARANCE IN FRONT OF PAD.

DETERMINED BY PG&E INSPECTORIIE
3-5" CONDUITS BY APPLICANT
2-4" CONDUITS BY APPLICANT
106"x90" STYLE IIE PAD

SERVICE JOINT TRENCH CONFIGURATION

TRENCH NOTES
INSTALLED IN EACH P.G.& E. ELECTRIC CONDUIT.

2. A P.G.& E. APPROVED PULL LINE SHALL BE

1. ALL CONDUITS SHALL BE PROVEN FREE OF DIRT,

5. DEVELOPER IS RESPONSIBLE FOR ACCURATE STAKING OF
AND APPROVED BY A P.G.& E. INSPECTOR.

4. DEVELOPER TO PROVIDE ALL ON-SITE & OFF-SITE

3. ALL TRENCHES AND CONDUITS MUST BE INSPECTED
TRENCHING PER PG&E SPECS.

CAPPED AND MARKED.

PROPERTY LINES AND ALL LOCATIONS OF BOXES,
TRANSFORMER PADS, ETC.

MAIN LINE JOINT TRENCH CONFIGURATION
HIGH FIRE THREAT AREA: LRA TIER 1
CUSTOMER CONTACT INFO:

RAY JUACHON 415-730-7994

AUTO SSD N/A
\ \
3-5" CONDUITS BY APPLICANT
2 RUNS OF 1000A QPX BY P.G.& E.

CUSTOMER IS RELOCATING EXISTING PANEL.

THEY ARE REMOVING A 1600 AMS AND
REPLACING IT WITH A 1000 AMP CT RATED
PANEL.

EXISTING P.M. TRANSFORMER WILL BE
RELOCATED AS WELL AS THE PRIMARY CABLE.

NEW P.M. TRANSFORMER WILL BE A
300KVA LB IIE W/ M-040292 PAD.

ALL SUBETRUCTURE WORK TO BE COMPLETED

BY APPLICANT

ALL CABLE AND TRANSFORMERS WILL BE
INSTALLED BY P.G.& E.
2-4" CONDUITS BY APPLICANT
3-1/0A EPR ENCAP (LOOP) BY P.G.& E.

15.b
Packet Pg. 571
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) App VII
Appendix VII:

Construction Workday Calendar

15.b
Packet Pg. 572
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project)

CONSTRUCTION WORKDAY CALENDAR
2023 - 5 Day

JANUARY JULY

SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT 436 437 438 439
1 2 3 4 5 6 7 1
440 441 442 443 444 560 561 562 563
8 9 10 11 12 13 14 2 3 4 5 6 7 8
445 446 447 448 564 565 566 567 568
15 16 17 18 19 20 21 9 10 11 12 13 14 15
449 450 451 452 453 569 570 571 572 573
22 23 24 25 26 27 28 16 17 18 19 20 21 22
454 455 574 575 576 577 578
29 30 31 23 24 25 26 27 28 29
579
30 31

FEBRUARY AUGUST
456 457 458 580 581 582 583
1 2 3 4 1 2 3 4 5
459 460 461 462 463 584 585 586 587 588
5 6 7 8 9 10 11 6 7 8 9 10 11 12
464 465 466 467 589 590 591 592 593
12 13 14 15 16 17 18 13 14 15 16 17 18 19
468 469 470 471 594 595 596 597 598
19 20 21 22 23 24 25 20 21 22 23 24 25 26
472 473 599 600 601 602
26 27 28 27 28 29 30 31

MARCH SEPTEMBER
474 475 476 603
1 2 3 4 1 2
477 478 479 480 481 604 605 606 607
5 6 7 8 9 10 11 3 4 5 6 7 8 9
482 483 484 485 486 608 609 610 611 612
12 13 14 15 16 17 18 10 11 12 13 14 15 16
487 488 489 490 491 613 614 615 616 617
19 20 21 22 23 24 25 17 18 19 20 21 22 23
492 493 494 495 618 619 620 621 622
26 27 28 29 30 31 24 25 26 27 28 29 30

APRIL OCTOBER
623 624 625 626 627
1 1 2 3 4 5 6 7
496 497 498 499 500 628 629 630 631
2 3 4 5 6 7 8 8 9 10 11 12 13 14
501 502 503 504 505 632 633 634 635 636
9 10 11 12 13 14 15 15 16 17 18 19 20 21
506 507 508 509 510 637 638 639 640 641
16 17 18 19 20 21 22 22 23 24 25 26 27 28
511 512 513 514 515 642 643
23 24 25 26 27 28 29 29 30 31
30 MAY NOVEMBER
516 517 518 519 520 644 645 646
1 2 3 4 5 6 1 2 3 4
521 522 523 524 525 647 648 649 650
7 8 9 10 11 12 13 5 6 7 8 9 10 11
526 527 528 529 530 651 652 653 654 655
14 15 16 17 18 19 20 12 13 14 15 16 17 18
531 532 533 534 535 656 657 658
21 22 23 24 25 26 27 19 20 21 22 23 24 25
536 537 659 660 661 662
28 29 30 31 26 27 28 29 30

JUNE DECEMBER
538 539 663
1 2 3 1 2
540 541 542 543 544 664 665 666 667 668
4 5 6 7 8 9 10 3 4 5 6 7 8 9
545 546 547 548 549 669 670 671 672 673
11 12 13 14 15 16 17 10 11 12 13 14 15 16
550 551 552 553 554 674 675 676 677 678
18 19 20 21 22 23 24 17 18 19 20 21 22 23
555 556 557 558 559 679 680 681 682
25 26 27 28 29 30 24 25 26 27 28 29 30
31 247 Working Days Prepared 10-17

15.b
Packet Pg. 573
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project)

CONSTRUCTION WORKDAY CALENDAR
2024 - 5 Day

JANUARY JULY

SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT 683 684 685 686 807 808 809 810
1 2 3 4 5 6 1 2 3 4 5 6
687 688 689 690 691 811 812 813 814 815
7 8 9 10 11 12 13 7 8 9 10 11 12 13
692 693 694 695 816 817 818 819 820
14 15 16 17 18 19 20 14 15 16 17 18 19 20
696 697 698 699 700 821 822 823 824 825
21 22 23 24 25 26 27 21 22 23 24 25 26 27
701 702 703 826 827 828
28 29 30 31 28 29 30 31

FEBRUARY AUGUST
704 705 829 830
1 2 3 1 2 3
706 707 708 709 710 831 832 833 834 835
4 5 6 7 8 9 10 4 5 6 7 8 9 10
711 712 713 714 836 837 838 839 840
11 12 13 14 15 16 17 11 12 13 14 15 16 17
715 716 717 718 841 842 843 844 845
18 19 20 21 22 23 24 18 19 20 21 22 23 24
719 720 721 722 846 847 848 849 850
25 26 27 28 29 25 26 27 28 29 30 31

MARCH SEPTEMBER
723 851 852 853 854
1 2 1 2 3 4 5 6 7
724 725 726 727 728 855 856 857 858 859
3 4 5 6 7 8 9 8 9 10 11 12 13 14
729 730 731 732 733 860 861 862 863 864
10 11 12 13 14 15 16 15 16 17 18 19 20 21
734 735 736 737 738 865 866 867 868 869
17 18 19 20 21 22 23 22 23 24 25 26 27 28
739 740 741 742 743 870
24 25 26 27 28 29 30 29 30
31 APRIL OCTOBER
744 745 746 747 871 872 873 874
1 2 3 4 5 6 1 2 3 4 5
748 749 750 751 752 875 876 877 878 879
7 8 9 10 11 12 13 6 7 8 9 10 11 12
753 754 755 756 757 880 881 882 883
14 15 16 17 18 19 20 13 14 15 16 17 18 19
758 759 760 761 762 884 885 886 887 888
21 22 23 24 25 26 27 20 21 22 23 24 25 26
763 764 889 890 891 892
28 29 30 27 28 29 30 31

MAY NOVEMBER
765 766 767 893
1 2 3 4 1 2
768 769 770 771 772 894 895 896 897 898
5 6 7 8 9 10 11 3 4 5 6 7 8 9
773 774 775 776 777 899 900 901 902
12 13 14 15 16 17 18 10 11 12 13 14 15 16
778 779 780 781 782 903 904 905 906 907
19 20 21 22 23 24 25 17 18 19 20 21 22 23
783 784 785 786 908 909 910
26 27 28 29 30 31 24 25 26 27 28 29 30

JUNE DECEMBER
911 912 913 914 915
1 1 2 3 4 5 6 7
787 788 789 790 791 916 917 918 919 920
2 3 4 5 6 7 8 8 9 10 11 12 13 14
792 793 794 795 796 921 922 923 924 925
9 10 11 12 13 14 15 15 16 17 18 19 20 21
797 798 799 800 801 926 927 928 929
16 17 18 19 20 21 22 22 23 24 25 26 27 28
802 803 804 805 806 930 931
23 24 25 26 27 28 29 29 30 31
30 249 Working Days Prepared 10-17

15.b
Packet Pg. 574
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project)

CONSTRUCTION WORKDAY CALENDAR
2025 - 5 Day

JANUARY JULY

SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT 932 933 55 56 57
1 2 3 4 1 2 3 4 5
934 935 936 937 938 58 59 60 61 62
5 6 7 8 9 10 11 6 7 8 9 10 11 12
939 940 941 942 943 63 64 65 66 67
12 13 14 15 16 17 18 13 14 15 16 17 18 19
944 945 946 947 68 69 70 71 72
19 20 21 22 23 24 25 20 21 22 23 24 25 26
948 949 950 951 952 73 74 75 76
26 27 28 29 30 31 27 28 29 30 31

FEBRUARY AUGUST
77 1 2
78 79 80 81 82
1 3 4 5 6 7 8 9
953 954 955 956 957 83 84 85 86 87
2 3 4 5 6 7 8 10 11 12 13 14 15 16
958 959 960 961 88 89 90 91 92
9 10 11 12 13 14 15 17 18 19 20 21 22 23
962 963 964 965 93 94 95 96 97
16 17 18 19 20 21 22 24 25 26 27 28 29 30
966 967 968 969 970
23 24 25 26 27 28 31

MARCH SEPTEMBER
98 99 100 101
1 1 2 3 4 5 6
971 972 973 974 975 102 103 104 105 106
2 3 4 5 6 7 8 7 8 9 10 11 12 13
976 977 978 979 980 107 108 109 110 111
9 10 11 12 13 14 15 14 15 16 17 18 19 20
981 982 983 984 985 112 113 114 115 116
16 17 18 19 20 21 22 21 22 23 24 25 26 27
986 987 988 989 990 117 118
23 24 25 26 27 28 29 28 29 30
30 31

APRIL OCTOBER
991 992 993 994 119 120 121
1 2 3 4 5 1 2 3 4
995 996 997 998 999 122 123 124 125 126
6 7 8 9 10 11 12 5 6 7 8 9 10 11
1000 1 2 3 4 127 128 129 130
13 14 15 16 17 18 19 12 13 14 15 16 17 18
5 6 7 8 9 131 132 133 134 135
20 21 22 23 24 25 26 19 20 21 22 23 24 25
10 11 12 136 137 138 139 140
27 28 29 30 26 27 28 29 30 31

MAY NOVEMBER
13 14
1 2 3 1
15 16 17 18 19 141 142 143 144 145
4 5 6 7 8 9 10 2 3 4 5 6 7 8
20 21 22 23 24 146 147 148 149
11 12 13 14 15 16 17 9 10 11 12 13 14 15
25 26 27 28 29 150 151 152 153 154
18 19 20 21 22 23 24 16 17 18 19 20 21 22
30 31 32 33 155 156 157
25 26 27 28 29 30 31 23 24 25 26 27 28 29
30 JUNE DECEMBER
34 35 36 37 38 158 159 160 161 162
1 2 3 4 5 6 7 1 2 3 4 5 6
39 40 41 42 43 163 164 165 166 167
8 9 10 11 12 13 14 7 8 9 10 11 12 13
44 45 46 47 48 168 169 170 171 172
15 16 17 18 19 20 21 14 15 16 17 18 19 20
49 50 51 52 53 173 174 175 176
22 23 24 25 26 27 28 21 22 23 24 25 26 27
54 177 178 179
29 30 28 29 30 31
248 Working Days Prepared 10-17

15.b
Packet Pg. 575
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) CONSTRUCTION 5-WORKDAY CALENDAR
Year 2026

JANUARY JULY
Sund Mond Tuesd Wedn Thurs Friday Satur Sund Mond Tuesd Wedn Thurs Friday Satur 180 303 304 305
1 2 3 1 2 3 4
181 182 183 184 185 306 307 308 309 310
4 5 6 7 8 9 10 5 6 7 8 9 10 11
186 187 188 189 190 311 312 313 314 315
11 12 13 14 15 16 17 12 13 14 15 16 17 18
191 192 193 194 316 317 318 319 320
18 19 20 21 22 23 24 19 20 21 22 23 24 25
195 196 197 198 199 321 322 323 324 325
25 26 27 28 29 30 31 26 27 28 29 30 31

FEBRUARY AUGUST
Sund Mond Tuesd Wedn Thurs Friday Satur Sund Mond Tuesd Wedn Thurs Friday Satur 200 201 202 203 204
1 2 3 4 5 6 7 1
205 206 207 208 326 327 328 329 330
8 9 10 11 12 13 14 2 3 4 5 6 7 8
209 210 211 212 331 332 333 334 335
15 16 17 18 19 20 21 9 10 11 12 13 14 15
213 214 215 216 217 336 337 338 339 340
22 23 24 25 26 27 28 16 17 18 19 20 21 22
341 342 343 344 345
23 24 25 26 27 28 29
346
30 31

MARCH SEPTEMBER
Sund Mond Tuesd Wedn Thurs Friday Satur Sund Mond Tuesd Wedn Thurs Friday Satur 218 219 220 221 222 347 348 349 350
1 2 3 4 5 6 7 1 2 3 4 5
223 224 225 226 227 351 352 353 354
8 9 10 11 12 13 14 6 7 8 9 10 11 12
228 229 230 231 232 355 356 357 358 359
15 16 17 18 19 20 21 13 14 15 16 17 18 19
233 234 235 236 237 360 361 362 363 364
22 23 24 25 26 27 28 20 21 22 23 24 25 26
238 365 366 367
29 30 31 27 28 29 30

APRIL OCTOBER
Sund Mond Tuesd Wedn Thurs Friday Satur Sund Mond Tuesd Wedn Thurs Friday Satur 239 240 241 368 369
1 2 3 4 1 2 3
242 243 244 245 246 370 371 372 373 374
5 6 7 8 9 10 11 4 5 6 7 8 9 10
247 248 249 250 251 375 376 377 378
12 13 14 15 16 17 18 11 12 13 14 15 16 17
252 253 254 255 256 379 380 381 382 383
19 20 21 22 23 24 25 18 19 20 21 22 23 24
257 258 259 260 384 385 386 387 388
26 27 28 29 30 25 26 27 28 29 30 31

MAY NOVEMBER
Sund Mond Tuesd Wedn Thurs Friday Satur Sund Mond Tuesd Wedn Thurs Friday Satur 261 389 390 391 392 393
1 2 1 2 3 4 5 6 7
262 263 264 265 266 394 395 396 397
3 4 5 6 7 8 9 8 9 10 11 12 13 14
267 268 269 270 271 398 399 400 401 402
10 11 12 13 14 15 16 15 16 17 18 19 20 21
272 273 274 275 276 403 404 405
17 18 19 20 21 22 23 22 23 24 25 26 27 28
277 278 279 280 406
24 25 26 27 28 29 30 29 30

31 JUNE DECEMBER
Sund Mond Tuesd Wedn Thurs Friday Satur Sund Mond Tuesd Wedn Thurs Friday Satur 281 282 283 284 285 407 408 409 410
1 2 3 4 5 6 1 2 3 4 5
286 287 288 289 290 411 412 413 414 415
7 8 9 10 11 12 13 6 7 8 9 10 11 12
291 292 293 294 295 416 417 418 419 420
14 15 16 17 18 19 20 13 14 15 16 17 18 19
296 297 298 299 300 421 422 423 424
21 22 23 24 25 26 27 20 21 22 23 24 25 26
301 302 425 426 427 428
28 29 30 27 28 29 30 31
249 Working Days Prepared 2-21

15.b
Packet Pg. 576
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) App VIII
Appendix VIII:

Best Management Practices for the Construction Industry

15.b
Packet Pg. 577
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) 2006
Small Business Hazardous Waste
Disposal Program

Businesses that generate less than 27 gallons or
220 pounds of hazardous waste per month are
eligible to use Santa Clara County’s Small
Business Hazardous Waste Disposal Program.

Call (408) 299-7300 for a quote, more information
or guidance on disposal.

Palo Alto operates a similar program, with monthly
collection, for small businesses. Call the City of
Palo Alto, (650) 496-6980, or Greenfield Services
Corporation, 1-800-433-5060 for information or to
schedule an appointment.

This brochure is one in a series of pamphlets
describing storm drain pollution prevention
measures for specific types of construction industry
activities. Other pamphlets include:

General Construction and Site Supervision
Landscaping, Gardening, and Pool
Maintenance
Fresh Concrete and Mortar Application
Painting and Application of Solvents and
Adhesives
Roadwork and Paving
Heavy Equipment Operation
Home Repair and Remodeling
For additional brochures contact:

Spill Response Agencies:

1. DIAL 9-1-1 for most communities
including San Jose (by cell phone - see
below)

2. From Cell Phones call . . . (408) 299-3144
County Communications (24 hours)

3. For non-hazardous spills in Campbell,
Los Gatos, Monte Sereno or Saratoga call
West Valley Inspector. . . (408) 828-4658

4. For non-hazardous spills in San Jose call
. . . . . . . . . . . . . . . . . . . . . (408) 945 -3000

5. State Office of Emergency Services
Warning Ctr (24 hours). . 1-800-852-7550
Local Pollution Control Agencies
County of Santa Clara Integrated Waste
Management Program. . . . . . . . (408) 441-1198
County of Santa Clara District Attorney
Environmental Crimes Hotline. . (408) 299-TIPS
Santa Clara County
Recycling Hotline. . . . . . . . . . . 1- 800-533-8414
Santa Clara Valley Water
District. . . . . . . . . . . . . . . . . . . (408) 265- 2600 Santa Clara Valley Water
District Pollution Hotline. . . . . . 1-888-510-5151
San Jose/Santa Clara Water
Pollution Control Plant. . . . . . . . (408) 945-3000
Serving Campbell, Cupertino, Los Gatos, Milpitas,
Monte Sereno, San Jose, Santa Clara, Saratoga
Sunnyvale Water Pollution Control Plant
Serving Sunnyvale. . . . . . . (408) 730-7270
Regional Water Quality
Control Plant. . . . . . . . . . . . . . . . (650) 329-2598 Serving East Palo Alto Sanitary District, Los Altos,
Los Altos Hills, Mountain View, Palo Alto, Stanford
Regional Water Quality Control Board
San Francisco Bay Region. . . . . . (510) 622-2300
Earth-Moving
and
Dewatering
Activities
Best Management Practices for
the Construction Industry

Who should use this brochure?
 Bulldozer, back hoe, and grading
machine operators
 Dump truck drivers
 Site supervisors
 General contractors
 Home builders
 Developers

15.b
Packet Pg. 578
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Preventing Pollution:

It’s Up to Us

In the Santa Clara Valley, storm drains transport
water directly to local creeks and San Francisco
Bay without treatment. Stormwater pollution is a
serious problem for wildlife dependent on our
waterways and for the people who live near
polluted streams or baylands. Some common
sources of this pollution include spilled oil, fuel, and fluids from vehicles and heavy equipment;
construction debris; sediment created by erosion,
landscaping runoff containing pesticides or weed
killers; and materials such as used motor oil,
antifreeze, and paint products that people pour or
spill into a street or storm drain.

Thirteen valley municipalities have joined together
with Santa Clara County and the Santa Clara
Valley Water District to educate local residents and
businesses and fight stormwater pollution. Join us,
by following the practices described in this
pamphlet.

Doing the Job Right

General Business Practices
 Schedule excavation and grading work during
dry weather.

 Perform major equipment repairs away from the
job site.

 When refueling or vehicle/equipment
maintenance must be done on site, designate a
location away from storm drains.

 Do not use diesel oil to lubricate equipment
parts, or clean equipment.

Practices During Construction
 Remove existing vegetation only when
absolutely necessary. Plant temporary
vegetation for erosion control on slopes or
where construction is not immediately planned.
 Protect downslope drainage courses, streams,
and storm drains with wattles, or temporary
drainage swales. Use check dams or ditches to
divert runoff around excavations. Refer to the
Regional Water Quality Control Board’s
Erosion and Sediment Control Field Manual for
proper erosion and sediment control
measures.
 Cover stockpiles and excavated soil with
secured tarps or plastic sheeting.

Dewatering Operations

1. Check for Toxic Pollutants
 Check for odors, discoloration, or an oily sheen
on groundwater.
 Call your local wastewater treatment agency
and ask whether the groundwater must be
tested.
 If contamination is suspected, have the water
tested by a certified laboratory.
 Depending on the test results, you may be
allowed to discharge pumped groundwater to
the storm drain (if no sediments present) or
sanitary sewer. OR, you may be required to
collect and haul pumped groundwater offsite
for treatment and disposal at an appropriate
treatment facility.

2. Check for Sediment Levels
 If the water is clear, the pumping time is less
than 24 hours, and the flow rate is less than
20 gallons per minute, you may pump water to
the street or storm drain.
 If the pumping time is more than 24 hours and
the flow rate greater than 20 gpm, call your
local wastewater treatment plant for guidance.
 If the water is not clear, solids must be filtered
or settled out by pumping to a settling tank
prior to discharge. Options for filtering include:
 Pumping through a perforated pipe sunk
part way into a small pit filled with gravel;
 Pumping from a bucket placed below water
level using a submersible pump;
 Pumping through a filtering device such as
a swimming pool filter or filter fabric
wrapped around end of suction pipe.
 When discharging to a storm drain, protect the
inlet using a barrier of burlap bags filled with
drain rock, or cover inlet with filter fabric
anchored under the grate. OR pump water
through a grassy swale prior to discharge.

Storm Drain Pollution
from Earth-Moving Activities
and Dewatering

Soil excavation and grading operations loosen
large amounts of soil that can flow or blow into
storm drains when handled improperly.

Sediments in runoff can clog storm drains,
smother aquat ic life, and destroy habitats in
creeks and the Bay. Effective erosion control
practices reduce the amount of runoff crossing
a site and slow the flow with check dams or
roughened ground surfaces.

Contaminated groundwater is a common
problem in the Santa C lara Valley. Depending
on soil types and site history, groundwater
pumped from construction sites may be
contaminated with toxics (such as oil or
solvents) or laden with sediments. Any of these
pollutants can harm wildlife in creeks or the
Bay, or interfer e with wastewater treatment
plant operation.

Discharging sediment -laden water from a
dewatering site into any water of the state
without treatment is prohibited.

15.b
Packet Pg. 579
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library 2006
Small Business Hazardous Waste
Disposal Program

Businesses that generate less than 27 gallons or
220 pounds of hazardous waste per month are
eligible to use Santa Clara County’s Small Business
Hazardous Waste Disposal Program. Call (408)
299-7300 for a quote, more information or guidance
on disposal.

Palo Alto operates a similar program, with monthly
collection, for small businesses. Call the City of
Palo Alto, (650) 496-6980, or Greenfield Services
Corporation, 1-800-433-5060 for information or to
schedule an appointment.

This brochure is one in a series of pamphlets
describing storm drain pollution prevention
measures for specific types of construction industry
activities. Other pamphlets include:

Home Repair and Remodeling

General Construction and Site Supervision
Landscaping, Gardening, and Pool
Maintenance

Painting and Application of Solvents and
Adhesives
Roadwork and Paving
Earth Moving Activities and Dewatering
Activities
Heavy Equipment Operation
For additional brochures contact:

Spill Response Agencies:

1. DIAL 9-1-1 for most communities including
San Jose. (by cell phone – see below)

2. From Cell Phones call . . . (408) 299-3144
County Communications (24 hours)

3. For non-hazardous spills in Campbell,
Los Gatos, Monte Sereno or Saratoga call
West Valley Inspector. . . (408) 354-5385

4. For non-hazardous spills in San Jose call
. . . . . . . . . . . . . . . . . . . . . (408) 945 -3000

5. State Office of Emergency Services
Warning Ctr (24 hours). . 1-800-852-7550
Local Pollution Control Agencies
County of Santa Clara Integrated Waste
Management Program. . . . . . . . . .(408) 441-1198
County of Santa Clara District Attorney
Environmental Crimes Hotline. . . . (408) 299-TIPS
Santa Clara County Hazardous Waste Disposal
. . . . . . . . . . . . . . . . . . . . . . . . . . . .(408) 299-7300 Santa Clara Valley Water
District. . . . . . . . . . . . . . . . . . . . . . (408) 265-2600 Santa Clara Valley Water
District Pollution Hotline. . . . . . . . .1-888-510-5151 San Jose/Santa Clara Water
Pollution Control Plant. . . . . . .. . . .(408) 945-3000 Serving Campbell, Cupertino, Los Gatos,
Milpitas, Monte Sereno, San Jose, Santa
Clara, Saratoga
Sunnyvale Water Pollution Control Plant
Serving Sunnyvale. . . . . . .. . (408) 730-7270
Palo Alto Regional Water Quality
Control Plant. . . . . . . . . . . . . . . . . (650) 329-2598 Serving East Palo Alto Sanitary District, Los
Altos, Los Altos Hills, Mountain View, Palo
Alto, Stanford
Regional Water Quality Control Board
San Francisco Bay Region. . . . . . (510) 622-2300

Fresh Concrete
and Mortar
Application
Best Management Practices for
the Construction Industry

Who should use this brochure?
 Masons and bricklayers
 Sidewalk construction crews
 Patio construction workers
 Construction inspectors
 General contractors
 Home builders
 Developers
 Concrete delivery/pumping workers

15.b
Packet Pg. 580
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

Preventing Pollution:

It’s Up to Us

In the Santa Clara Valley, storm drains transport
water directly to local creeks and San Francisco
Bay without treatment. Stormwater pollution is a
serious problem for wildlife dependent on our
creeks and bays and for the people who live near
polluted streams or baylands. Common sources of
this pollution include spilled oil, fuel, and fluids from vehicles and heavy equipment; construction debris;
sediment created by erosion; landscaping runoff
containing pesticides or weed killers; and materials
such as used motor oil, antifreeze, and paint
products that people pour or spill into a street or
storm drain.

Thirteen valley municipalities have joined together
with Santa Clara County and the Santa Clara Valley
Water District to educate local residents and
businesses and fight stormwater pollution. Join us,
by following the practices described in this
pamphlet.

Doing the Job Right

General Business Practices

 Wash out concrete mixers only in designated
wash-out areas in your yard, away from storm
drains and waterways, where the water will flow
into a temporary waste pit in a dirt area. Let
water percolate through soil and dispose of
settled, hardened concrete as garbage.

Whenever possible, recycle washout by
pumping back into mixers for reuse.
 Wash out chutes onto dirt areas at site that do
not flow to streets or drains.
 Always store both dry and wet materials under
cover, protected from rainfall and runoff and
away from storm drains or waterways. Protect
dry materials from wind.
 Secure bags of cement after they are open. Be
sure to keep wind-blown cement powder away
from streets, gutters, storm drains, rainfall, and
runoff.
 Do not use diesel fuel as a lubricant on
concrete forms, tools, or trailers.

During Construction

 Don’t mix up more fresh concrete or cement
than you will use in a two-hour period.
 Set up and operate small mixers on tarps or
heavy plastic drop cloths.

 When cleaning up after driveway or sidewalk
construction, wash fines onto dirt areas, not
down the driveway or into the street or storm
drain.
 Protect applications of fresh concrete and
mortar from rainfall and runoff until the material
has dried.
 Wash down exposed aggregate concrete only
when the wash water can (1) flow onto a dirt
area; (2) drain onto a bermed surface from
which it can be pumped and disposed of
properly; or (3) be vacuumed from a catchment
created by blocking a storm drain inlet. If
necessary, divert runoff with temporary berms.

Make sure runoff does not reach gutters or
storm drains.
 When breaking up pavement, be sure to pick
up all the pieces and dispose of properly.

Recycle large chunks of broken concrete at a
landfill.
 Never bury waste material. Dispose of small
amounts of excess dry concrete, grout, and
mortar in the trash.
 Never dispose of washout into the street, storm
drains, drainage ditches, or streams.

Storm Drain Pollution from
Fresh Concrete and
Mortar Applications

Fresh concrete and cement-related
mortars that wash into lakes, streams,
or estuaries are toxic to fish and the
aquatic environment. Disposing of
these materials to the storm drains or
creeks can block storm drains, causes
serious problems, and is prohibited by
law.

15.b
Packet Pg. 581
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library 2006
Small Business Hazardous Waste
Disposal Program

Businesses that generate less than 27 gallons or
220 pounds of hazardous waste per month are
eligible to use Santa Clara County’s Small Business
Hazardous Waste Disposal Program. Call (408)
299-7300 for a quote, more information or guidance
on disposal.

Palo Alto operates a similar program, with monthly
collection, for small businesses. Call the City of
Palo Alto, (650) 496-6980, or Greenfield Services
Corporation, 1-800-433-5060 for information or to
schedule an appointment.

This brochure is one in a series of pamphlets
describing storm drain pollution prevention
measures for specific types of construction industry
activities. Other pamphlets include:

Home Repair and Remodeling

General Construction and Site Supervision
Landscaping, Gardening, and Pool
Maintenance

Painting and Application of Solvents and
Adhesives
Roadwork and Paving
Earth Moving Activities and Dewatering
Activities
Heavy Equipment Operation
For additional brochures contact:

Spill Response Agencies:

1. DIAL 9-1-1 for most communities including
San Jose (by cell phone – see below)

2. From Cell Phones call . . . (408) 299-3144
County Communications (24 hours)

3. For non-hazardous spills in Campbell,
Los Gatos, Monte Sereno or Saratoga call
West Valley Inspector. . . (408) 828-4658

4. For non-hazardous spills in San Jose call .
. . . . . . . . . . . . . . . . . . . . (408) 945 -3000

5. State Office of Emergency Services
Warning Ctr (24 hours). . 1-800-852-7550
Local Pollution Control Agencies
County of Santa Clara Integrated Waste
Management Program. . . . . . . . (408) 441-1198
County of Santa Clara District Attorney
Environmental Crimes Hotline. . (408) 299-TIPS
Santa Clara County
Recycling Hotline. . . . . . . . . . . 1- 800-533-8414
Santa Clara Valley Water
District. . . . . . . . . . . . . . . . . . . (408) 265- 2600 Santa Clara Valley Water
District Pollution Hotline . . . . . . 1-888-510-5151
San Jose/Santa Clara Water
Pollution Control Plant. . . . . . . . (408) 945-3000
Serving Campbell, Cupertino, Los Gatos,
Milpitas, Monte Sereno, San Jose, Santa
Clara, Saratoga
Sunnyvale Water Pollution Control Plant
Serving Sunnyvale. . . . . . . (408) 730-7270
Regional Water Quality
Control Plant. . . . . . . . . . . . . . . . (650) 329-2598 Serving East Palo Alto Sanitary District, Los
Altos, Los Altos Hills, Mountain View, Palo
Alto, Stanford
Regional Water Quality Control Board
San Francisco Bay Region. . . . . . (510) 622-2300

General
Construction
and Site
Supervision

Best Management Practices
for Construction

Who should use this brochure?
 General contractors
 Site supervisors
 Inspectors
 Home builders
 Developers

15.b
Packet Pg. 582
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Preventing Pollution:

It’s Up to Us
In the Santa Clara Valley, storm drains transport
water directly to local creeks and San Francisco
Bay without treatment. Stormwater pollution is a
serious problem for wildlife dependent on our
waterways and for the people who live near polluted
streams or baylands. Some common sources of
this pollution include spilled oil, fuel, and fluids from vehicles and heavy equipment; construction debris;
sediment created by erosion; landscaping runoff
containing pesticides or weed killers; and materials
such as used motor oil, antifreeze, and paint
products that people pour or spill into a street or
storm drain.

Thirteen valley municipalities have joined together
with Santa Clara County and the Santa Clara Valley
Water District to educate local residents and
businesses and fight stormwater pollution. Join us,
by following the practices described in this
pamphlet.

Doing the Job Right
General Principles
 Keep an orderly site and ensure good
housekeeping practices are used.
 Maintain equipment properly.
 Cover materials when they are not in use.
 Keep materials away from streets, storm drains
and drainage channels.
 Ensure dust control water doesn’t leave site or
discharge to storm drains.

Advance Planning To Prevent Pollution
 Schedule excavation and grading activities for dry
weather periods. To reduce soil erosion, plant
temporary vegetation or place other erosion
controls before rain begins. Use the Erosion and
Sediment Control Manual, available form the
Regional Water Quality Control Board, as a
reference.
 Control the amount of runoff crossing your site
(especially during excavation!) by using berms or
temporary or permanent drainage ditches to

divert water flow around the site.

Reduce stormwater runoff velocities by
constructing temporary check dams or berms
where appropriate.
 Train your employees and subcontractors. Make
these brochures available to everyone who works
on the construction site. Inform subcontractors
about the stormwater requirements and their own
responsibilities. Use Blueprint for a Clean Bay, a
construction best management practices guide
available from the Santa Clara Valley Urban Runoff
Pollution Prevention Program, as a reference.

Good Housekeeping Practices
 Designate one area of the site for auto parking,
vehicle refueling, and routine equipment
maintenance. The designated area should be well
away from streams or storm drain inlets, bermed if
necessary. Make major repairs off site.
 Keep materials out of the rain – prevent runoff
contamination at the source. Cover exposed piles
of soil or construction materials with plastic
sheeting or temporary roofs. Before it rains, sweep
and remove materials from surfaces that drain to
storm drains, creeks, or channels.
 Keep pollutants off exposed surfaces. Place trash
cans and recycling receptacles around the site to
minimize litter.
 Clean up leaks, drips and other spills immediately
so they do not contaminate soil or groundwater or
leave residue on paved surfaces. Use dry cleanup
methods whenever possible. If you must use water,
use just enough to keep the dust down.
 Cover and maintain dumpsters. Check frequently
for leaks. Place dumpsters under roofs or cover
with tarps or plastic sheeting secured around the
outside of the dumpster. Never clean out a
dumpster by hosing it down on the construction
site.
 Place portable toilets away from storm drains.

Make sure portable toilets are in good working
order. Check frequently for leaks.

Materials/Waste Handling

 Practice Source Reduction -- minimize waste
when you order materials. Order only the amount
you need to finish the job.
 Use recyclable materials whenever possible.

Arrange for pick-up of recyclable materials such as
concrete, asphalt, scrap metal, solvents,
degreasers, cleared vegetation, paper, rock, and
vehicle maintenance materials such as used oil,
antifreeze, batteries, and tires.
 Dispose of all wastes properly. Many construction
materials and wastes, including solvents, water-
based paints, vehicle fluids, broken asphalt and
concrete, wood, and cleared vegetation can be
recycled. (See the reference list of recyclers in
Blueprint for a Clean Bay.) Materials that cannot be
recycled must be taken to an appropriate landfill or
disposed of as hazardous waste. Never bury waste
materials or leave them in the street or near a
creek or stream bed.

Permits
 In addition to local grading and building permits,
you will need to obtain coverage under the State's
General Construction Activity Stormwater Permit if
your construction site's disturbed area totals 1 acre
or more. Information on the General Permit can be
obtained from the Regional Water Quality Control
Board.

Storm Drain Pollution from
Construction Activities
Construction sites are common sources of
storm water pollution. Materials and wastes
that blow or wash into a storm drain, gutter, or
street have a direct impact on local creeks and
the Bay.

As a contractor, or site supervisor, owner
or operator of a site, you may be
responsible for any environmental damage
caused by your subcontractors or
employees.

15.b
Packet Pg. 583
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Small Business Hazardous Waste
Disposal Program

Businesses that generate less than 27 gallons or
220 pounds of hazardous waste per month are
eligible to use Santa Clara County’s Small Business
Hazardous Waste Disposal Program. Call (408)
299-7300 for a quote, more information or guidance
on disposal.

Palo Alto operates a similar program, with monthly
collection, for small businesses. Call the City of
Palo Alto, (650) 496-6980, or Greenfield Services
Corporation, 1-800-433-5060 for information or to
schedule an appointment.

This brochure is one in a series of pamphlets
describing storm drain pollution prevention
measures for specific types of construction industry
activities. Other pamphlets include:

Home Repair and Remodeling
General Construction and Site Supervision
Landscaping, Gardening, and Pool
Maintenance
Fresh Concrete and Mortar Application
Painting and Application of Solvents and
Adhesives
Roadwork and Paving
Earth-Moving Activities and Dewatering
Activities
For additional brochures contact:

Spill Response Agencies:

1. DIAL 9-1-1 for most communities including
San Jose (by cell phone – see below)

2. From Cell Phones call . . . (408) 299-3144
County Communications (24 hours)

3. For non-hazardous spills in Campbell,
Los Gatos, Monte Sereno or Saratoga call
West Valley Inspector. . . (408) 828-4658

4. For non-hazardous spills in San Jose call
. . . . . . . . . . . . . . . . . . . . . (408) 945 -3000

5. State Office of Emergency Services
Warning Ctr (24 hours). . 1-800-852-7550
Local Pollution Control Agencies
County of Santa Clara Integrated Waste
Management Program. . . . . . . . . (408) 441-1198
County of Santa Clara District Attorney
Environmental Crimes Hotline. . . . (408) 299-TIPS
Santa Clara County
Recycling Hotline. . . . . . . . . . . . . .1-800-533-8414 Santa Clara Valley Water
District. . . . . . . . . . . . . . . . . . . . . . (408) 265-2600 Santa Clara Valley Water
District Pollution Hotline. . . . . . . . 1-888-510-5151 San Jose/Santa Clara Water
Pollution Control Plant. . . . . . . . . (408) 945-3000

Serving Campbell, Cupertino, Los Gatos, Milpitas,
Monte Sereno, San Jose, Santa Clara, Saratoga
Sunnyvale Water Pollution Control Plant
Serving Sunnyvale. . . . . . . . (408) 730-7270 Regional Water Quality
Control Plant. . . . . . . . . . . . . . . . . (650) 329-2598 Serving East Palo Alto Sanitary District, Los Altos,
Los Altos Hills, Mountain View, Palo Alto, Stanford
Regional Water Quality Control Board
San Francisco Bay Region. . . . . . . (510) 622-230
2006
Heavy
Equipment

Operation

Best Management Practices for
the Construction Industry

Who should use this brochure?
 Vehicle and equipment operators
 Site supervisors
 General contractors
 Home builders
 Developers

15.b
Packet Pg. 584
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Preventing Pollution:

It’s Up to Us
In the Santa Clara Valley, storm drains transport
water directly to local creeks and San Francisco
Bay, without treatment. Stormwater pollution is a
serious problem for wildlife dependent on our
waterways and for people who live near polluted
streams or baylands. Some common sources of
this pollution include spilled oil, fuel, and fluids from vehicles and heavy equipment; construction debris;
sediment created by erosion, landscaping runoff
containing pesticides or weed killers; and materials
such as used motor oil, antifreeze, and paint
products that people pour or spill into streets or
storm drains.

Thirteen valley municipalities have joined together
with Santa Clara County and the Santa Clara Valley
Water District to educate local residents and
businesses and fight stormwater pollution. Join us,
by following the practices described in this
pamphlet.

Doing the Job Right

Site Planning and Preventive Vehicle
Maintenance

 Designate one area of the construction site, well
away from streams or storm drain inlets, for
auto and equipment parking, refueling, and
routine vehicle and equipment maintenance.

Contain the area with berms, sand bags, or
other barriers.
 Maintain all vehicles and heavy equipment.

Inspect frequently for and repair leaks.

 Perform major maintenance, repair jobs, and
vehicle and equipment washing off site where
cleanup is easier.
 If you must drain and replace motor oil, radiator
coolant, or other fluids on site, use drip pans or
drop cloths to catch drips and spills. Collect all
spent fluids, store in separate containers, and
properly dispose as hazardous waste (recycle
whenever possible).
 Do not use diesel oil to lubricate equipment
parts, or clean equipment. Use only water for
any onsite cleaning.
 Cover exposed fifth wheel hitches and other oily
or greasy equipment during rain events.

Spill Cleanup

 Clean up spills immediately when they happen.

 Never hose down "dirty"
pavement or impermeable surfaces where
fluids have spilled. Use dry cleanup methods
(absorbent materials, cat litter, and/or rags)
whenever possible and properly dispose of
absorbent materials.
 Sweep up spilled dry materials immediately.

Never attempt to “wash them away" with water,
or bury them.
 Use as little water as possible for dust control.

Ensure water used doesn’t leave silt or
discharge to storm drains.
 Clean up spills on dirt areas by digging up and
properly disposing of contaminated soil.
 Report significant spills to the appropriate local
spill response agencies immediately. (See
reverse side of brochure for telephone
numbers.)
 If the spill poses a significant hazard to human
health and safety, property or the environment,
you must also report it to the State Office of
Emergency Services (see reverse).

Stormwater Pollution
from Heavy Equipment on
Construction Sites

Poorly maintained vehicles and heavy
equipment that leak fuel, oil, antifreeze
or other fluids on the construction site
are common sources of storm drain
pollution. Prevent spills and leaks by
isolating equipment from runoff
channels, and by watching for leaks
and other maintenance problems.

Remove construction equipment from
the site as soon as possible.

15.b
Packet Pg. 585
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Small Business Hazardous Waste
Disposal Program

Businesses that generate less than 27 gallons or 220
pounds of hazardous waste per month are eligible to
use Santa Clara County’s Small Business Hazardous
Waste Disposal Program. Call (408) 299-7300 for a
quote.

Palo Alto operates a similar program, with monthly
collection, for small businesses. Call the City of Palo Alto, (650) 496-6980, or Greenfield Services
Corporation, 1-800-433-5060 for information or to
schedule an appointment.

This brochure is one in a series of pamphlets
describing storm drain pollution prevention measures
for specific types of construction industry activities.

Other pamphlets include:

General Construction and Site Supervision
Landscaping, Gardening, and Pool
Maintenance
Painting and Application of Solvents and
Adhesives
Fresh Concrete and Mortar Application
Roadwork and Paving
Earth-Moving Activities and Dewatering
Activities
Heavy Equipment Operation
Home Repair and Remodeling

For additional brochures contact:

Spill Response Agencies:

1. DIAL 9-1-1 for most communities including
San Jose (by cell phone – see below)

2. From Cell Phones call . . . (408) 299-3144
County Communications (24 hours)

3. For non-hazardous spills in Campbell,
Los Gatos, Monte Sereno or Saratoga call
West Valley Inspector. . . (408) 828-4658

4. For non-hazardous spills in San Jose call . .
. . . . . . . . . . . . . . . . . . . (408) 945-3000

5. State Office of Emergency Services Warning
Ctr (24 hours). . 1-800-852-7550
Local Pollution Control Agencies
County of Santa Clara Integrated Waste
Management Program. . . . . . . . . . . . (408) 441-1198 County of Santa Clara District Attorney
Environmental Crimes Hotline. . . . . . .(408) 299-TIPS Santa Clara County
Recycling Hotline. . . . . . . . . . . . . . . . 1-800-533-8414 Santa Clara Valley Water
District. . . . . . . . . . . . . . . . . . . . . . . . .(408) 265-2600 Santa Clara Valley Water
District Pollution Hotline. . . . . . . . . . .1-888-510-5151 San Jose/Santa Clara Water
Pollution Control Plant. . . . . . . . . . . . (408) 945-3000 Serving Campbell, Cupertino, Los Gatos,
Milpitas, Monte Sereno, San Jose, Santa
Clara, Saratoga
Sunnyvale Water Pollution Control Plant
Serving Sunnyvale. . . . . . . . . . . 408) 730-7270
Regional Water Quality
Control Plant. . . . . . . . . . . . . . . . . . . .(650) 329-2598 Serving East Palo Alto Sanitary District, Los
Altos, Los Altos Hills, Mountain View, Palo
Alto, Stanford
Regional Water Quality Control Board
San Francisco Bay Region. . . . . . . . . (510) 622-2300

2006

Home Repair
and Remodeling
Best Management Practices for
Construction Activities
 Landscaping/Foundation Work
 Painting and Paint Cleanup
 Concrete, Masonry, and Tile Work
 General Construction

Who should use this brochure?

 Homeowners
 Do-it yourself remodelers
 General contractors

15.b
Packet Pg. 586
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Preventing Pollution:

It’s Up to Us
In the Santa Clara Valley, storm drains transport
water directly to local creeks and San Francisco Bay,
without treatment. Stormwater pollution is a serious
problem for wildlife dependent on our waterways and
for people who live near polluted streams or
baylands. Some common sources of this pollution
include spilled oil, fuel, and fluids from vehicles and heavy equipment; construction debris; sediment
created by erosion, landscaping runoff containing
pesticides or weed killers; and materials such as
used motor oil, antifreeze, and paint products that
people pour or spill into streets or storm drains.

Thirteen valley municipalities have joined together
with Santa Clara County and the Santa Clara Valley
Water District to educate local residents and
businesses and fight stormwater pollution. Join us, by
following the practices described in this pamphlet.

Doing the Job Right
This brochure is for homeowners, and do-it-
yourself remodelers who have access to residential
household hazardous waste disposal programs.

Contractors and other professionals should refer to
the Santa Clara Valley Urban Runoff Pollution
Prevention Program’s other publications in this series
of brochures, and to Blueprint for a Clean Bay, a
manual of best-management practices for
construction-related industries.

Keep waterway protection in mind whenever you or
people you hire work on your house or property.

The property owner is ultimately responsible for
correcting any pollution problems caused by
construction activities.

Penalties may be more severe if storm drain pollution
is not reported promptly.

Painting and
Paint Cleanup
All paints, solvents, and adhesives contain chemicals
that are harmful to aquatic animals and other wildlife
in our creeks and Bay. Toxic chemicals may come
from liquid or solid products or from cleaning residues on rags.

It is especially important not to clean brushes or
painting equipment (buckets, pans, hoses, etc.) in an
area where paint or paint cleanup water can flow to a
gutter, street, or storm drain.

Paint Cleanup
 Never clean brushes or rinse paint
containers into a street, gutter, storm
drain, or stream.
 For water-based paints, paint out
brushes on scrap material to the
extent possible, and rinse into a
drain that goes to the sanitary
sewer (i.e. indoor plumbing).
 For oil-based paints, paint out brushes to the
extent possible before soaking in paint thinner to
clean. Filter and reuse thinner and solvents.

Dispose of unwanted oil-based paint, used
thinner, and paint residue at a hazardous waste
collection event.
 When they are thoroughly dry, empty paint cans,
spent brushes, rags, and drop cloths may be
disposed of as trash. Leave the lids off paint
cans so the refuse collector can see that they
are empty.
 Dispose of empty aerosol paint cans as
household hazardous waste.

Paint Removal
 Buildings constructed
before 1978 may have
lead paint. Test paint
for lead by taking paint
scrapings to a local
laboratory.

Concrete, Masonry, and Tile Work
 Don’t mix up more fresh concrete or cement
than you need for each project.
 Cover and protect bags of cement and plaster
after they are open. Be sure to keep wind-blown
cement powder away from gutters, storm drains,
rainfall, and runoff.
 Wash down exposed aggregate concrete only
when wash water can flow onto a dirt area, or be
collected, pumped, and disposed of properly.

Make sure runoff does not reach gutters or
storm drains.
 Never wash excess material from bricklaying or
patio or driveway construction into a street or
storm drain. Empty mixing container onto a dirt
area, or allow material to dry and put in trash.
 Dispose of small amounts of excess dry
concrete, grout, and mortar in the trash. Call
your local refuse hauler for weight and size
limits.
 Collect and reuse excess abrasive gravel and
sand.
 Never hose down driveways, sidewalk, or
streets.

General Construction
 Keep all construction debris away from the
street, gutter, and storm drain.
 During cleanup, check the street and gutters for
sediment, refuse, or debris. Look around the
corner or downstream for material that may have
already traveled away from your property.
 If you or your contractor keep a dumpster at
your site, be sure it is securely covered with a lid
or tarp when it is not in use.
 Place portable toilets away from storm drains.

Make sure toilets are in working order. Check
frequently for leaks.

15.b
Packet Pg. 587
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Household Hazardous Waste
Disposal

For information, contact your City’s program or the
Santa Clara County Household Hazardous Waste
Program, (408) 299-7300.

For Palo Alto residents, household hazardous waste
is collected monthly at the Regional Water Quality
Control Plant, 2501 Embarcadero Way. Most events
are on the first Saturday of the month, from 9 a.m.
until noon. For information, call (650) 496-6980.

City of Santa Clara collection events are held twice a
year. Call (408) 984-3080.

Construction Materials &
Equipment Reuse and Exchange

CALMAX
Sacramento
(916) 255-2369
Bi-monthly listing of available and wanted materials:
www.ciwmb.ca.gov/CalMAX/

Urban Ore, Inc.
7th Street at Ashby, Berkeley
(510) 235-0172
Building materials exchange, household goods, office
furniture
Recycling—Buy and sell building
materials, concrete, asphalt, yard
waste
ABC Recycling Industries
Santa Clara
(408) 732-9253
Pallets, cardboard
BFI – Waste Systems of North America, Inc.

San Jose
(408) 432-1234
Construction demolition materials, concrete
with/without rebar, asphalt and untreated wood
(separation of these materials at the source of
generation required)
Butterick Enterprises
San Jose
(408)292-5687
Asphalt, concrete, mixed asphalt, rock, wood,
construction demolition materials; on-site pickup
available
C & M Diversified
330 N. Montgomery St., San Jose
(408) 294-5185
Doors, filing cabinets, kitchen cabinets, plumbing
fixtures, windows
Granite Rock
San Jose
(408) 574-3000
Asphalt, concrete, concrete with rebar
Los Altos Garbage Company/Stevens Creek
Disposal & Recycling
Santa Clara
(408) 970-5100
Wood, toilets, construction demolition materials
Raish Products Recycling Yard
143 Carl Road., Sunnyvale
(408) 734-4245
Asphalt, concrete
Recycle West
Santa Clara
(888) 366-7228
Concrete, untreated wood, construction debris; on-
site pickup available
The Recyclery
San Jose
(408) 262-1401
Clean wood waste, clean concrete (<1’), asphalt
SRDC
199 Seaport Blvd., Redwood City
(650) 961-2742
Brick, concrete, rock
San Martin Transfer and Recycling
San Martin
(408) 842-3358
Asphalt, concrete, rocks, wood/demolition debris,
untreated wood only; on-site pickup available
Valley Recycling
San Jose
(408) 297-5352
Construction demolition debris
Zanker Resource Management
705 Los Esteros Road, San Jose
(408) 263-2383

15.b
Packet Pg. 588
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Landscaping/Foundation Work
Intensive gardening, landscaping, and all excavation
projects such as foundation repair or pool
construction expose soils and increase the likelihood
that garden chemicals and earth will wash into the
storm drains. Be careful to control erosion and
minimize runoff to all driveways, gutters, and storm
drains.
 Schedule grading and excavation projects
during dry weather.
 Cover excavated material and stockpiles of
asphalt, sand, etc. with plastic tarps during the
rainy season.
 Replant as soon as possible, with temporary
vegetation such as annual grass seed if
necessary. Revegetation provides excellent
erosion control.
 Take care not to over apply pesticides, and use
up leftover supply. Rinse empty containers, and
use rinsewater as you would use the product.

Dispose of empty rinsed containers in the trash.
 Dispose of unused pesticide as hazardous
waste.
 Collect lawn and garden clippings, pruning
waste, and tree trimmings. Many cities and
landfills have yard waste collection and
composting programs. Check with your
municipality to see if yard waste pickup is
available and what the collection requirements
are.
 In areas with curbside pickup of yard waste
place clippings and pruning waste in approved
bags or containers.
 Do not blow or rake leaves, etc. into the
street, or place yard waste in gutters or on
dirt shoulders, unless you are piling them for
recycling (San Jose and unincorporated County
only).
 In San Jose, leave yard waste for curbside
recycling in piles in the street, 18 inches from
the curb and completely out of the flow line of
any storm drain. Or, take to a landfill that
composts yard waste.
 Chemical paint stripping residues, including
saturated rags, are a hazardous waste and
should be taken to a household hazardous
waste event.
 Chips and dust from marine paints or paints
containing lead, mercury or tributyl-tin are
hazardous wastes. Sweep up paint chips and
properly store for
household hazardous
waste event.

Reuse/recycle leftover
paints whenever possible
 Use up excess
paint or give it to
a neighbor, or take
it to a household
hazardous waste
event. Most
household
hazardous waste
collection programs
can recycle latex
(water-based)
paint.

Recycle:

Plant material/tree branches, leaves, etc.

Wood, broken asphalt, and concrete (check with your
local landfill)
Water-based paints (in some communities)
Used motor oil (curbside pickup in most communities)
Antifreeze (in some communities)

Take to a household hazardous
waste drop-off event:

Unused garden and household chemicals
Leftover paint
Used solvents
Paint stripping residue and rags
Used antifreeze

Dispose as trash:

Construction debris from small projects
Dry, empty paint cans, spent brushes, rags, and drop
cloths
Small amounts of dry mortar, grout, etc.

Clean up all
spills when they
happen. Do not
flush spills into
storm
drains. If
construction
materials or
other wastes get
into a gutter, storm
drain, or creek, call your
local spill response agency
immediately! (See list on back of brochure.)

15.b
Packet Pg. 589
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Small Business Hazardous Waste
Disposal Program

Businesses that generate less than 27 gallons or
220 pounds of hazardous waste per month are
eligible to use Santa Clara County’s Small Business
Hazardous Waste Disposal Program. Call (408)
299-7300 for a quote, more information or guidance
on disposal.

Palo Alto operates a similar program, with monthly
collection, for small businesses. Call the City of
Palo Alto, (650) 496-6980, or Greenfield Services
Corporation, 1-800-433-5060 for information or to
schedule an appointment.

This brochure is one in a series of pamphlets
describing storm drain pollution prevention
measures for specific types of construction industry
activities. Other pamphlets include:

General Construction and Site Supervision
Painting and Application of Solvents and
Adhesives
Fresh Concrete and Mortar Application
Roadwork and Paving
Earth-Moving Activities and Dewatering
Activities
Heavy Equipment Operation

Home Repair and Remodeling

For additional brochures contact:

Spill Response Agencies:

1. DIAL 9-1-1 for most communities including
San Jose (by cell phone – see below)

2. From Cell Phones call . . . (408) 299-3144
County Communications (24 hours)

3. For non-hazardous spills in Campbell,
Los Gatos, Monte Sereno or Saratoga call
West Valley Inspector. . . (408) 828-4658

4. For non-hazardous spills in San Jose call
. . . . . . . . . . . . . . . . . . . . . (408) 945 -3000

5. State Office of Emergency Services
Warning Ctr (24 hours). . 1-800-852-7550
Local Pollution Control Agencies
County of Santa Clara Integrated Waste
Management Program. . . . . . . . . (408) 441-1198

County of Santa Clara District Attorney
Environmental Crimes Hotline. . . . (408) 299-TIPS
Santa Clara County
Recycling Hotline. . . . . . . . . . . . . .1-800-533-8414 Santa Clara Valley Water
District. . . . . . . . . . . . . . . . . . . . . .(408) 265-2600

Santa Clara Valley Water
District Pollution Hotline. . . . . . . . 1-888-510-5151 San Jose/Santa Clara Water
Pollution Control Plant. . . . . . . . . .(408) 945-3000

Serving Campbell, Cupertino, Los Gatos, Milpitas,
Monte Sereno, San Jose, Santa Clara, Saratoga
Sunnyvale Water Pollution Control Plant
Serving Sunnyvale. . . . . . . . . (408) 730-7270
Regional Water Quality
Control Plant. . . . . . . . . . . . . . . . . (650) 329-2598 Serving East Palo Alto Sanitary District, Los Altos,
Los Altos Hills, Mountain View, Palo Alto, Stanford
Regional Water Quality Control Board
San Francisco Bay Region. . . . . . .(510) 622-2300

2006
Landscaping,
Gardening, and
Pool Maintenance

Best Management Practices for
the Construction Industry

Who should use this brochure?
 Landscapers
 Gardeners
 Swimming pool/ spa
service and repair workers
 General contractors
 Home builders
 Developers
 Homeowners

15.b
Packet Pg. 590
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Preventing Pollution:

It’s Up to Us

In the Santa Clara Valley, storm drains transport
water directly to local creeks and San Francisco
Bay without treatment. Stormwater pollution is a
serious problem for wildlife dependent on our
waterways and for the people who live near polluted
streams or baylands. Some common sources of
this pollution include spilled oil, fuel, and fluids from vehicles and heavy equipment; construction debris;
sediment created by erosion; landscaping runoff
containing pesticides or weed killers; and materials
such as used motor oil, antifreeze, and paint
products that people pour or spill into a street or
storm drain.

Thirteen valley municipalities have joined together
with Santa Clara County and the Santa Clara Valley
Water District to educate local residents and
businesses and fight stormwater pollution. Join us,
by following the practices described in this
pamphlet.

Doing the Job Right
General Business Practices
 Protect stockpiles and landscaping materials
from wind and rain by storing them under tarps
or secured plastic sheeting.
 Store pesticides, fertilizers, and other
chemicals indoors or in a shed or storage
cabinet.
 Schedule grading and excavation projects
during dry weather.
 Use temporary check dams or ditches to divert
runoff away from storm drains.
 Protect storm drains with sandbags or other
sediment controls.
 Revegetation is an excellent form of erosion
control for any site.

Landscaping/Garden Maintenance
 Use pesticides sparingly, according to
instructions on the label. Rinse empty
containers, and use rinsewater as product.

Dispose of rinsed, empty containers in the
trash. Dispose of unused pesticides as
hazardous waste.
 Collect lawn and garden clippings, pruning
waste, and tree trimmings. Chip if necessary,
and compost.
 In communities with curbside pick-up of yard
waste, place clippings and pruning waste at the
curb in approved bags or containers. Or, take
to a landfill that composts yard waste. No
curbside pickup of yard waste is available for
commercial properties.
 Do not blow or rake leaves, etc. into the street,
or place yard waste in gutters or on
dirt shoulders, unless you are piling
them for recycling (allowed by San
Jose and unincorporated County
only). Sweep up any leaves, litter
or residue in gutters or on street.
 In San Jose, leave yard waste for
curbside recycling pickup in piles in
the street, 18 inches from the curb
and completely out of the flow line
to any storm drain.

Pool/Fountain/Spa Maintenance
Draining pools or spas
When it’s time to drain a pool, spa, or fountain,
please be sure to call your local wastewater
treatment plant before you start for further guidance
on flow rate restrictions, backflow prevention, and
handling special cleaning waste (such as acid
wash). Discharge flows should be kept to the low
levels typically possible through a garden hose.

Higher flow rates may be prohibited by local
ordinance.
 Never discharge pool or spa water to a street
or storm drain; discharge to a sanitary sewer
cleanout.
 If possible, when emptying a pool or spa, let
chlorine dissipate for a few days and then
recycle/reuse water by draining it gradually onto
a landscaped area.
 Do not use copper-based algaecides. Control
al
gae with chlorine or other alternatives, such
as sodium bromide.

Filter Cleaning
 Never clean a filter in the street or near a storm
drain. Rinse cartridge and diatomaceous earth
filters onto a dirt area, and spade filter residue
into soil. Dispose of spent diatomaceous earth
in the garbage.
 If there is no suitable dirt area, call your local
wastewater treatment plant for instructions on
discharging filter backwash or rinsewater to the
sanitary sewer.

Storm Drain Pollution
from Landscaping and
Swimming Pool Maintenance
Many landscaping activities expose soils and
increase the likelihood that earth and garden
chemicals will run off into the storm drains
during irrigation or when it rains. Swimming pool
water containing chlorine and copper-based
algaecides should never be discharged to storm
drains. These chemicals are toxic to aquatic life.

15.b
Packet Pg. 591
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library 2006
Small Business Hazardous Waste
Disposal Program

Businesses that generate less than 27 gallons or
220 pounds of hazardous waste per month are
eligible to use Santa Clara County’s Small Business
Hazardous Waste Disposal Program. Call (408)
299-7300 for a quote, more information or guidance
on disposal.

Palo Alto operates a similar program, with monthly
collection, for small businesses. Call the City of
Palo Alto, (650) 496-6980, or Greenfield Services
Corporation, 1-800-433-5060 for information or to
schedule an appointment.

This brochure is one in a series of pamphlets
describing storm drain pollution prevention
measures for specific types of construction industry
activities. Other pamphlets include:

General Construction and Site Supervision
Landscaping, Gardening, and Pool
Maintenance
Painting and Application of Solvents and
Adhesives
Fresh Concrete and Mortar Application
Earth-Moving Activities and Dewatering
Activities
Heavy Equipment Operation

Home Repair and Remodeling

For additional brochures contact:

Spill Response Agencies:

1. DIAL 9-1-1 for most communities including
San Jose (by cell phone – see below)

2. From Cell Phones call . . . (408) 299-3144
County Communications (24 hours)

3. For non-hazardous spills in Campbell,
Los Gatos, Monte Sereno or Saratoga call
West Valley Inspector. . . (408) 828-4658

4. For non-hazardous spills in San Jose call
. . . . . . . . . . . . . . . . . . . . . (408) 945 -3000

5. State Office of Emergency Services
Warning Ctr (24 hours). . 1-800-852-7550
Local Pollution Control Agencies
County of Santa Clara Integrated Waste
Management Program. . . . . . . . . (408) 441-1198
County of Santa Clara District Attorney
Environmental Crimes Hotline . . .(408) 299-TIPS
Santa Clara County
Recycling Hotline. . . . . . . . . . . . .1-800-533-8414 Santa Clara Valley Water
District. . . . . . . . . . . . . . . . . . . . . .(408) 265-2600 Santa Clara Valley Water
District Pollution Hotline. . . . . . . . 1-888-510-5151 San Jose/Santa Clara Water
Pollution Control Plant. . . . . . . . . .(408) 945-3000 Serving Campbell, Cupertino, Los Gatos,
Milpitas, Monte Sereno, San Jose, Santa
Clara, Saratoga
Sunnyvale Water Pollution Control Plant
Serving Sunnyvale. . . . . . . . (408) 730-7270
Regional Water Quality
Control Plant. . . . . . . . . . . . . . . . . (650) 329-2598 Serving East Palo Alto Sanitary District, Los
Altos, Los Altos Hills, Mountain View, Palo
Alto, Stanford
Regional Water Quality Control Board
San Francisco Bay Region. . . . . . .(510) 622-2300

Roadwork
and
Paving
Best Management Practices for
the Construction Industry

Who should use this brochure?
 Road crews
 Driveway/ sidewalk/ parking lot
construction crews
 Seal coat contractors
 Operators of grading equipment,
paving machines, dump trucks,
concrete mixers
 Construction inspectors
 General contractors
 Home builders
 Developers

15.b
Packet Pg. 592
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Preventing Pollution:

It’s Up to Us
In the Santa Clara Valley, storm drains transport
water directly to local creeks and San Francisco
Bay without treatment. Stormwater pollution is a
serious problem for wildlife dependent on our
creeks and bay and for the people who live near
polluted streams or baylands. Common sources of
this pollution include spilled oil, fuel, and fluids from vehicles and heavy equipment; construction debris;
sediment created by erosion; landscaping runoff
containing pesticides or weed killers; and materials
such as used motor oil, antifreeze, and paint
products that people pour or spill into a street or
storm drain.

Thirteen valley municipalities have joined together
with Santa Clara County and the Santa Clara Valley
Water District to educate local residents and
businesses and fight stormwater pollution. Join us,
by following the practices described in this
pamphlet.

Doing the Job Right

General Business Practices

 Develop and implement erosion/sediment
control plans for roadway embankments.
 Schedule excavation and grading work during
dry weather.
 Check for and repair leaking equipment.
 Perform major equipment repairs at designated
areas in your maintenance yard, where cleanup
is easier. Avoid performing equipment repairs
at construction sites.

 When refueling or when vehicle/equipment
maintenance must be done on site, designate a
location away from storm drains and creeks.
 Do not use diesel oil to lubricate equipment
parts or clean equipment.
 Recycle used oil, concrete, broken asphalt, etc.
whenever possible, or dispose of properly.

During Construction

 Avoid paving and seal coating in wet weather,
or when rain is forecast, to prevent fresh
materials from contacting stormwater runoff.
 Cover and seal catch basins and manholes
when applying seal coat, slurry seal, fog seal,
or similar materials.
 Protect drainage ways by using earth dikes,
sand bags, or other controls to divert or trap
and filter runoff.
 Never wash excess material from exposed-
aggregate concrete or similar treatments into a
street or storm drain. Collect and recycle, or
dispose to dirt area.

 Cover stockpiles (asphalt, sand, etc.) and other
construction materials with plastic tarps.

Protect from rainfall and prevent runoff with
temporary roofs or plastic sheets and berms.
 Park paving machines over drip pans or
absorbent material (cloth, rags, etc.) to catch
drips when not in use.
 Clean up all spills and leaks using “dry”
methods (with absorbent materials and/or
rags), or dig up, remove, and properly dispose
of contaminated soil.
 Collect and recycle or appropriately dispose of
excess abrasive gravel or sand.
 Avoid over-application by water trucks for dust
control.

Asphalt/Concrete Removal

 Avoid creating excess dust when breaking
asphalt or concrete.
 After breaking up old pavement, be sure to
remove all chunks and pieces. Make sure
broken pavement does not come in contact
with rainfall or runoff.
 When making saw cuts, use as little water as
possible. Shovel or vacuum saw-cut slurry and
remove from the site. Cover or protect storm
drain inlets during saw-cutting. Sweep up, and
properly dispose of, all residues.
 Sweep, never hose down streets to clean up
tracked dirt. Use a street sweeper or vacuum
truck. Do not dump vacuumed liquor into storm
drains.

Storm Drain Pollution
from Roadwork

Road paving, surfacing, and pavement removal
happen right in the street, where there are
numerous opportunities for asphalt, saw-cut
slurry, or excavated material to illegally enter
storm drains.

Extra planning is required to store and dispose of
materials properly and guard against pollution of
storm drains, creeks, and the Bay.

15.b
Packet Pg. 593
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library App IX
Appendix IX:

City’s Storm Water Pollution Control Requirements

15.b
Packet Pg. 594
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project)

CAMPBELL MUNICIPAL CODE
Chapter 14.02

STORMWATER POLLUTION CONTROL

SECTIONS:

14.02.010 Purpose.

14.02.020 Definitions.

14.02.030 Requirements.

14.02.040 Enforcement--Violation--Penalties.

14.02.050 Inspection

14.02.010 Purpose.

The U.S. Environmental Protection Agency has identified urban stormwater runoff as the leading cause of water pollution in the United States. Furthermore, both federal and state agencies have identified stormwater runoff from the city as a major source of pollution adversely impacting the beneficial uses of the South San Francisco Bay. As a result, the California Regional Water Quality Control Board, San Francisco Bay Region, has issued a National Pollutant Discharge Elimination System ("NPDES") permit requiring the city to establish legal authorities sufficient to protect its municipal storm drain system from certain prohibited discharges. The city is also required to implement a stormwater management program to assure that stormwater runoff from the city does not cause or contribute to a violation of the water quality standards of South San Francisco Bay.

The purpose of this chapter is therefore to provide minimum requirements designed to control the discharge of pollutants into the city municipal storm drain system and to assure that discharges from the city municipal storm drain system comply with applicable provisions of the Federal Clean Water Act and the National Pollutant Discharge Elimination System Permit No. CA0029718 including amendments and California Regional Water Quality Control Board approvals. Enactment of this chapter falls within the scope of the city police power to protect the health, safety and welfare of its residents.

Nothing in this chapter is intended to preclude more stringent federal or state re gulation of any activity covered by this chapter.

14.02.020 Definitions.

The following words and phrases, when used in this chapter, shall be as defined herein.

Words and phrases used in this chapter and not otherwise defined shall be as defined in the regulations promulgated by the U.S. Environmental Protection Agency to implement the requirements of the Federal Clean Water Act, or as defined by the State Water Resources Control Board to implement the California Water Code:

A. “ Applicable materials
" m eans all materials used in industrial or commercial establishments that are stored outdoors, that may be exposed to stormwater, and that have the reasonable potential to degrade the quality of runoff from the site. These include, but J:\FORMS\Templates\Storm Water Requirements\Stormwater Ordinance 7_04.doc (Rev. 03/08) 1

15.b
Packet Pg. 595
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) are not limited to, all materials containing cadmium, chromium, copper, lead, mercury, nickel, selenium, silver and zinc, which are pollutants that have specifically been identified as known to contribute to impairment of applicable water quality standards.

B. “ Deemed complet e
” means that a project applicant has submitted a development application package for discretionary approval that is determined to be a complete and acceptable application by the Community Development Director. Public projects are deemed complete if funding has been approved by the City Council and construction has been scheduled.

C. "Discharge
" means the discharge, addition, placement, deposit, release or dumping of any pollutant or combination of pollutants to surface waters from any point source. This definition includes, but is not limited to, additions of pollutants into waters, from: surface runoff and discharges through pipes, sewers, channels or other conveyances owned by a state, municipality or other person which do not lead to a treatment works . "Discharge," within the meaning of this chapter, shall also mean any discharge on public on private property which results or will reasonably result in a discharge into any and all watercourses. Such discharges represent a process whereby pollutants, deb ris and chemicals are placed or otherwise deposited on streets, construction sites, parking lots and other exposed surfaces and are subsequently washed off and carried away by stormwater runoff into watercourses.

D. " Grease
" means, and includes, fats, oils, waxes or other related constituents. Grease may be of mineral origin, including kerosene, lubricating oil and road oil. Grease may also be of vegetable or animal origin, including butter, lard, margarine, vegetable fats and oils, fats in meats, cereals, seeds, nuts and certain fruits. Grease is generally present as, but need not be, a floatable solid, a liquid, a colloid, an emulsion, or in a solution.

E. "Grease generating activity
" means any commercial or industrial activity that uses or produces grease on an ongoing basis.

F. " Grease removal device
" means an interceptor or other mechanical device designed, constructed and intended to remove, hold or otherwise prevent the passage of grease to the (sanitary sewer or) municipal storm drain system.

G. “ Impervious surface
” means a constructed or modified surface that does not allow rainfall to percolate through to the subsoil and thus creates stormwater runoff.

Impervious surface includes, but is not limited to, building rooftops, pavement, sidewalks, patios, driveways or other hardscape where such surfaces are not constructed with pervious materials and/or are not designed so as to have zero stormwater discharge.

H. " Interceptor
" means a receptacle or trap designed and constructed to intercept, separate and prevent the passage of prohibited substances into the (sanitary sewer or) municipal storm drain system.

J:\FORMS\Templates\Storm Water Requirements\Stormwater Ordinance 7_04.doc (Rev. 03/08) 2

15.b
Packet Pg. 596
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) I. " Major development or redevelopment project " means a project that creates, adds, or replaces an amount of impervious surface as defined in the current NPDES permit.

J. "Municipal storm drain system " means and includes, but shall not be limited to, those facilities within the municipality by which stormwater may be conveyed to waters of the United States, including any roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, manmade channels or storm drains, which are not part of a publicly owned treatment works (POTW).

K. " NPDES permit
" means a valid National Pollutant Discharge Elimination System permit issued by the California Regional Water Quality Control Board, San Francisco Bay Region, in accordance with regulations promulgated by the U.S. Environmental Protection Agency to implement the requirements of the Federal Clean Water Act.

L. " Pollutants
" means and includes all sewage, sewage sludge, garbage, biological materials, radioactive materials, and chemical, industrial and agricultural waste discharge into water.

M. “ Project with significant pollution potential
” means any project determined by the
city to be likely to have sources of pollutants on- site and/or to contribute pollutants to stormwater after project completion, based on a review of the proposed uses of or activities planned for the site.

N. "Stormwater
" means all rainfall runoff, surface runoff and drainage.

O. " Watercourses
" mean and include all natural waterways and definite channels and depressions in the earth that carry water, even though such waterways may only carry water during rains and storms and may not carry stormwater at and during all times and seasons. Watercourses include facilities owned and operated by the Santa Clara Valley Water District.

14.02.030 Requirements.

A. Non-stormwater discharges
.

1. Discharge Prohibition. No person shall discharge or cause to be discharged into the municipal storm drain system or watercourses any materials other than stormwater. In addition, no person shall discharge or cause to be discharged into the municipal storm drain system or watercourses, any pollutants or waters containing any pollutants that cause or threaten to contribute to a violation of applicable water quality standards. It is also unlawful to discharge, or cause to be discharged into any storm drain or natural outlet or channel, any sewage, industrial waste or other polluted waters or materials without a valid NPDES permit or written authority from the U.S.

Environmental Protection Agency or its designated enforcement agent.

J:\FORMS\Templates\Storm Water Requirements\Stormwater Ordinance 7_04.doc (Rev. 03/08) 3

15.b
Packet Pg. 597
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project)

2. Exceptions to Discharge Prohibition. The preceding discharge prohibition in subsection A.1. shall not apply to any discharge that is specifically authorized by an NPDES permit to flow to a storm drain or natural outlet or channel. In addition, the California Regional Water Quality Control Board, San Francisco Bay Region, has determined that the discharge prohibition shall not apply to the following "permissible" activities: water line flushing, landscape irrigation/lawn watering, uncontaminated foundation drains, uncontaminated nonindustrial roof drains, irrigation water, uncontaminated groundwater infiltration, residential car washings, flows from firefighting, flows from potable water sources, and dechlorinated swimming pool waters.

3. Protection Against Accident Discharge. The owner or operator of a commercial or industrial establishment shall provide reasonable protection from accidental discharge of prohibited materials or other wastes into the municipal storm drain system or watercourses. Facilities to prevent accidental discharge of prohibited materials or other wastes shall be provided and maintained at the owner or operator's expense.

4. Report of Accidental Discharges. Where an accidental discharge of prohibited materials or other wastes has entered the municipal storm drain system or a watercourse, such incident shall be reported to city or designated agent as soon as possible, but in no event later than twenty -four hours after such a discharge. If the accidental discharge or prohibited materials or other wastes emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also retain an on- site written record of the discharge and the actions taken to prevent its recurrence. Such records shall be retained for at least three years. A notice shall be permanently posted in a conspicuous place on the premises of each commercial or industrial establishment advising employees of the department or agency to call in case of such an accidental discharge.

5. Abatement of Prohibited Discharge by Responsible Party. The prohibited discharges are declared to constitute a public nuisance. Remediation and abatement of prohibited discharges shall be the responsibility of persons causing such discharge. The city shall be advised of the abatement and shall inspect the discharge site to insure tha t the nuisance has in fact been abated.

B. Watercourse protection
.

1. Watercourse Protection Requirements. Every person owning property through which a watercourse passes, or such person's lessee, shall keep and maintain that part of the Watercourse within the property reasonably free of trash, debris, excessive vegetation, and other obstacles that would pollute, contaminate or significantly retard the flow of water through the watercourse. In addition, the owner or lessee shall maintain existing privately owned structures within or adjacent to a watercourse, so that such structures will not become a hazard to the use, function or physical integrity of the watercourse. The owner or lessee shall not remove healthy bank vegetation beyond that J:\FORMS\Templates\Storm Water Requirements\Stormwater Ordinance 7_04.doc (Rev. 03/08) 4

15.b
Packet Pg. 598
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) actually n ecessary for maintenance, nor remove the vegetation in such a manner as to increase the vulnerability of the watercourse to erosion.

2. Acts Requiring Permit. No person shall commit or cause to be committed any of the following acts, unless a written permit has first been obtained from the city or designated agent:

(a) Discharge into or connect any pipe or channel to a watercourse;

(b) Modify the natural flow of water in a watercourse.

(c) Carry out development within a setback designed in whole or in part to protect a watercourse;

(d) Deposit in, plant in, or remove any material from a watercourse, including its banks, except as required for necessary maintenance;

(e) Construct, alter, enlarge, connect to, change or remove any structure in a watercourse; or

(f) Place any loose or unconsolidated material along the side of or within a watercourse or so close to a side as to cause a diversion of the flow, or to cause a probability of such material being carried away by stormwater passing through such watercourse.

C. Outdoor Storage of Materials
.

1. Proper Outdoor Storage of Materials Required. All applicable materials stored outdoors at a commercial or industrial establishment shall be managed in a manner that minimizes the discharge of pollutants to stormwater and as is required to meet water quality standards. Establishments covered by the general NPDES permit for stormwater discharges associated with industrial activities that has been promulga ted for Santa Clara County by the California Regional Water Quality Control Board, San Francisco Bay Region, shall address this requirement in applicable provisions of their stormwater pollution prevention plan.

2. Protection Against Accidental Discharg e. The owner or operator of a commercial or industrial establishment shall provide reasonable protection from accidental discharge of applicable materials to the municipal storm drain system or watercourses. Specifically, secondary containment systems or equivalent measures approved by the fire department shall be provided for all applicable materials that are liquids. All facilities to prevent the accidental discharge of applicable materials to the municipal storm drain system and watercourses shall be provided and maintained at the owner or operator's expense.

J:\FORMS\Templates\Storm Water Requirements\Stormwater Ordinance 7_04.doc (Rev. 03/08) 5

15.b
Packet Pg. 599
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project)

3. Report of Accidental Discharge to the Storm Drain. Where applicable materials have entered the municipal storm drain system or a watercourse due to an accidental discharge at a commercial or industrial establishment, the owner or operator of such establishment shall report such incident to public works department as soon as possible, but in no event later than twenty -four hours after such a discharge. The owner or operator of such establishment shall also retain an on -site written record of all accidental discharges of applicable materials (whether or not such discharge actually entered the municipal storm drain system or a watercourse) and the actions taken to prevent their recurrence. Such records shall be retained for at least five years. A notice shall be permanently posted in a conspicuous place on the premises of each commercial or industrial establishment advising employees of the department or agency to call in case of such an accidental discharge.

D. Grease Disposal and Control
.

1. Grease Disposal Prohibited. No person shall dispose of any grease, or cause any grease to be disposed, by discharge into any drainage piping, (any public or private sanitary sewer), any part of the muni cipal storm drain system, or any land, street, public way, river, stream or other watercourse.

2. Grease Removal Device Required. The owner or operator of every newly constructed, remodeled or converted commercial or industrial establishment with one or more grease generating activities shall install or cause to be installed for each grease generating activity, a grease removal device (of an approved design) for preventing the passage of grease to the municipal storm drain system and watercourses.

3. Maintenance of Grease Removal Devices Required. The contents of all grease removal devices shall be removed periodically as necessary to prevent a violation of this chapter. At a minimum, the contents shall be removed every ninety days. All grease removal devices shall be kept in good repair, and shall be maintained in continuous operation at the owner or operator's expense.

E. New Development/Redevelopment
.

1. Stormwater Management Required for Major Projects. Every applicant for a building permit for a major development or redevelopment project shall identify the potential for stormwater to be discharged from the project site following completion of construction activity and shall demonstrate that the plans, drawings or specifications for such project include the installation of management techniques, practices, and control measures designed to mitigate the potential adverse impacts of stormwater that may be discharged from the project site on an ongoing basis including stormwater treatment measures. In addition, applicants for building and/or grading permits for projects with significant pollution potential may be required to demonstrate that sources of pollutants will be controlled onsite with appropriate measures. The stormwater management techniques, practices, and control measures shall be selected, designed, and maintained in J:\FORMS\Templates\Storm Water Requirements\Stormwater Ordinance 7_04.doc (Rev. 03/08) 6

15.b
Packet Pg. 600
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) accordance with the city’s current NPDES permit requirements and the city’s Stormwater Management Manual.

2. Issuance of Permits. The city shall not issue a building permit and/or grading permit for a major development or redevelopment project or a project with significant pollution potential until it has reviewed the mitigation measures proposed by the applicant pursuant to the preceding paragraph, where appropriate, and determined that they are sufficient to address the potential adverse impacts of stormwater that may be discharged from the project site on an ongoing basis.

3. Occupancy. The building official shall not issue a certificate of occupancy or other equivalent permit for a major development or redevelopment project or a project with significant pollution potential until it has determined that the mitigation measures identified in the building permit and/or grading permit issued for such project have been adequately implemented and that appropriate arrangements have been made to ensure that these management techniques, practices and control measures will be maintained on an ongoing basis in accordance with the city’s current NPDES permit requirements and the city’s Stormwater Management Manual.

14.02.040 Enforcement--Violation--Penalties.

A. Criminal Penalties
. Any person who violates any provision of this chapter shall be guilty of a misdemeanor and upon conviction thereof shall be punishable by imprisonment for a term not to exceed six months or by a fine not to exceed one thousand dollars or by both. Each and every violation of this chapter shall constitute a separate offense. Every day each such violation continues shall be an additional offense.

B. Civil Penalties
. Any person who violates any provision of this chapter shall be civilly liable to the city in a sum not to exceed one thousand dollars per day for each day in which the violation occurs. Each and every violation of this chapter shall constitute a separate offense. Every day each such violation continues shall be an additional offense.

C. Civil Liability
. Any person who violates any provision of this chapter shall be civilly liable to the city for all costs, including attorney's fees, associated with the investigation and remediation of environmental conditions caused by the discharge of pollutants into the municipal storm drain system or watercourse in violation of this chapter.

D. Remedies Cumulative
. The remedies provided for in this chapter are cumulative and not exclusive and shall be in addition to any and all other remedies available to the city under state and federal law.

E. Public Nuisance
. The discharge of pollutants and related applicable materials into any municipal storm drain system or other watercourses, in violation of any provision of this chapter, is declared to be a public nuisance and shall be subject to any and all remedies available, pursuant to city, state and federal law, including but not limited to injunctive J:\FORMS\Templates\Storm Water Requirements\Stormwater Ordinance 7_04.doc (Rev. 03/08) 7

15.b
Packet Pg. 601
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) relief. The director of public works may record with the county recorder's office a declaration of nuisance for the particular parcel so noticed.

14.02.050 Inspection

A. During Regular Business Hours
. Every business establishment that is open to the
public shall permit agents of the city to inspect their premises for compliance with this chapter at any time the business is open to the public.

B. Other Times
. Notwithstanding subsection (a) of this section, agents of the city may inspect any property for compliance with this chapter upon providing the owner and occupants of the property at least twenty -four hours’ advance notice of the inspection in the following manner:

1. A notice shall be conspicuously posted on the property to be inspected, specifying the date, time and reason for the proposed inspection and setting forth a telephone number with directions for the residents or property owners to call for further information; and

2. If the identity and address of the owner is known, such owner shall be notified of the proposed inspection by first class mail, setting forth the same information required by subsection B.1. of this section.

C. Provisions Supplemental
. The inspection provisions set forth in this section are intended to supplement, and not supersede, any existing authority for inspection by city officials. In the event that any provision of this section is found by a court of competent jurisdiction to be void or unenforceable, the remaining portions shall remain in full force and effect.

J:\FORMS\Templates\Storm Water Requirements\Stormwater Ordinance 7_04.doc (Rev. 03/08) 8

15.b
Packet Pg. 602
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) App X
Appendix X:

South Bay Water Recycling Program

15.b
Packet Pg. 603
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) South Bay Water
Recycling Program
700 Los Esteros Road, San José, CA 95134
Recycled water is used in water features and the irrigatation system of the Evergreen Community College campus in south San José.

Environmental Services Delivering world class
utility services and programs to improve our
health, environment, and economy
www.sjenvironment.org Main: 408-535-8550
Media Contact
Jennie Loft, Public Information Manager
[email protected]
408-535-8554
I
n the South Bay, recycled water is a locally sustainable and established component of the non-potable water supply. With pipeline in the cities of San José, Santa Clara, and Milpitas, South Bay Water Recycling (SBWR) is the largest of four recycled water systems in Santa Clara County. The other systems
are associated with the wastewater treatment facilities in Sunnyvale, Gilroy/Morgan Hill, and Palo Alto/Mountain View.

CUSTOMERS, RETAILERS & SERVICE AREA
� Number of customers: ~ 750
Includes Levi’s Stadium, Great America, McCarthy Ranch
Shopping Center, Evergreen College, Guadalupe Gardens,
Intel, and San José City Hall
�
SBWR is a reycled water wholesaler to San Jose Water
Company, San José Municipal Water, City of Santa Clara, and City of Milpitas; customers buy recycled water from the water retailer for their location
SYSTEM
SBWR comprises a north-south artery across San José and an east-west artery from mid-Milpitas down through the
eastern side of Santa Clara. These main arteries feed extension pipelines to reach various customers. The system includes:
�
140 miles of pipeline and growing
� 5 pump stations
� 3 above-ground storage reservoirs that together have a storage capacity of 9.5 million gallons

PRIMARY USES OF SBWR RECYCLED WATER
� Irrigation at public parks, theme parks, golf courses, street medians, business landscaping, and college campuses
� Industrial cooling towers and 4 power plants
� Toilet/urinal flushing in dual-plumbed commercial and municipal buildings

RECYCLED WATER SOURCE
� SBWR main pump station is adjacent to the San José-Santa Clara Regional Wastewater Facility (RWF), which manages the SBWR program
�
RWF produces an average 110 mgd of high quality, tertiary- treated water; roughly 13% flows to SBWR, remainder
discharges into the Bay
�
As of March 2014, SBWR blends RWF tertiary water with
water from Silicon Valley Advanced Water Purification
Center, operated by the Santa Clara Valley Water District mgd = million gallons per day
over

15.b
Packet Pg. 604
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) M:\MEDIA FACT SHEETS\SBWR MediaFactSheet
04-25-16 jh
recycled water signage
SBWR main pump station
Great America irrigates with
recycled water

INVESTMENT & RATE SETTING
� SBWR reflects a ~$250 million investment to date; US
Bureau of Reclamation is reimbursing SBWR for 25% of this investment
�
Santa Clara Valley Water District has contributed several million dollars to SBWR
�
San Jose Water Company is constructing new extensions
to the system at their own cost, and paying a $2 million capacity fee to ensure system reliability
�
SBWR sets the wholesale recycled water rate to water
retailers, who in turn set rates for their respective customers

CONTACTS
SBWR
City of San José Environmental Services Dept.

Media contact: Jennie Loft (408) 535-8554

RECYCLED WATER RETAILERS
City of Milpitas Water & Sewer
Public Works Department
1265 North Milpitas Boulevard, Milpitas, CA 95035
Phone: (408) 586-2600 www.ci.milpitas.ca.gov

City of Santa Clara Water & Sewer Utility
1500 Warbutron Avenue, Santa Clara, CA 95050
Phone: (408) 615-2000 www.santaclaraca.gov

San Jose Municipal Water System - Recycled Water
Engineering & Operations
3035 Tuers Rd., San José, CA 95121
Phone: (408) 535-3500 www.sanjoseca.gov

San Jose Water Company
110 W. Taylor St., San José, CA 95110
Phone: (408) 279-7900 www.sjwater.com

DELIVERY VOLUME & GREEN VISION
SBWR deliveries have grown:
�
2012: SBWR delivered an average 10.3 mgd to ~690 customers � 2014: SBWR delivers average 14 mgd to ~750 customers
With an average home of 4 people using 400 gallons per day, the rate of 14 mgd offsets enough drinking water to supply ~ 35,000 homes daily
�
Production since inception in 1998: 43.9 billion gallons Equivalent to the water use of ~ 217,000 homes in one year � San José’s Green Vision, a plan for a sustainable San José, includes a goal to recycle or beneficially use 100% of our wastewater and targets 40 mgd of recycled water use by 2022

REGULATIONS & WATER QUALITY MONITORING
� Regional Water Quality Control Board regulates and
monitors the safe use of recycled water under Title 22 of the California Code of Regulations; the Board also reviews building plans to ensure that reycled water and drinking water pipes and systems do not mix
�
Title 22 outlines bacteriological water quality standards for the expected degree of public contact with recycled water; if public contact is anticipated, disinfected tertiary treatment is required, such as provided by SBWR
�
RWF laboratory, a state-of-the-art water quality lab, tests SBWR recycled water regularly to ensure its safety; SBWR frequently surpasses requirements for recycled water
quality

ROLE OF SILICON VALLEY ADVANCED WATER

PURIFICATION CENTER (SVAWPC)
� Santa Clara Valley Water District opened SVAWPC in March 2014 as a demonstration project to advance recycled water as a drought-proof component of our water supply
�
8 mgd capacity
� Receives secondary-treated wastewater from RWF and uses microfiltration, reverse osmosis, and ultra-violet disinfection to fully purify the water
�
At SBWR main pump station, SVAWPC purified water blends with RWF tertiary water, thus reducing its salt content �
SBWR provides water that ranks among the highest quality recycled water in California
For more information, visit www.sjenvironment/sbwr

15.b
Packet Pg. 605
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Revision 0223015
South Bay Water Recycling
Recycled Water Access Point Program
Fact Sheet

Expanding Recycled Water Use with Recycled Water Access Points (RWAP) To conserve our valuable drinking (potable) water supplies, South Bay Water Recycling (SBWR) has made recycled water available for commercial non-potable uses at several truck fill locations in San José and Milpitas. State Approved uses include construction activities such as grading, compaction, concrete wetting, and dust control as well as landscape irrigation, pressure washing, and sewer flushing.

Recycled Water Quality
Recycled water is highly treated to meet rigorous and protective standards set by the State Water Resources Control Board – Division of Drinking Water, and SBWR currently supplies clean and safe tertiary-treated recycled water to over 750 customers in San Jose, Milpitas and Santa Clara.

Participation Requirements
Users must complete a short Training and sign a User Agreement to confirm the correct use of the fill stations and the proper handling of recycled water. In addition, trucks must be inspected and labeled to certify that they are correctly equipped to transfer recycled water.

After truck and driver certification, users will be issued a portable recycled water meter, with a unique nozzle that can only fit the RWAP hydrants. This minimizes the possibility of cross- connections between the potable and recycled water distribution systems.

Construction exemptions for required use of recycled water may be granted on a case by case basis
, depending on the availability of recycled water near the project site. Please contact the City Planning Department for more information on the required use of recycled water for proposed projects.

Getting Started
In order to complete the certification process, and receive meters, site keys, and the most updated site maps, please contact the recycled water retail agencies listed below:

Milpitas – call (408) 586-2600
San Jose –call (408) 277-3671

RWAP Supervisor Trainings are scheduled every Wednesday morning from 9am-11am at the San Jose/Santa Clara Regional Wastewater Facility (700 Los Esteros Road in San José) or by appointment. Contact the City of Milpitas for trainings and inspections in their area.

15.b
Packet Pg. 606
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) South Bay Water Recycling
Recycled Water Access Point
FAQs

1. What is a Recycled Water Access Point?
A Recycled Water Access Point (or RWAP) is a stand-pipe that allows a certified RWAP Supervisor access to recycled water to fill their tanker truck.

2. How can I get locations and information about using recycled water from an RWAP? Please contact your local water retailer or South Bay Water Recycling for availability in your area.

City of Milpitas – (408) 586-2600
City of San José – South Bay Water Recycling (408) 277-3671

3. What are the uses for recycled water?
Recycled water is approved for nonpotable (non drinking) uses such as irrigation, dust control, and street sweeping

4. Can I use recycled water to irrigate my landscape at home? No. Recycled Water is approved only for commercial (non-residential) uses.

5. Can I drink recycled water?
No. At this time, recycled water is not approved for drinking.

6. Do I have to use recycled water?
The use of recycled water is required by many city ordinances if recycled water is available. Visit your local city’s planning department for availability in your area.

7. Where does recycled water come from?
Recycled water is produced from treated wastewater from the San Jose/Santa Clara Regional Wastewater Facility.

8. Why is recycled water regulated more than potable (drinking) water? Recycled water is safe to use by trained personnel to assure it is used appropriately and that the public drinking water supply is separated and protected from contamination.

9. Are there any rules I need to follow when using recycled water? Recycled water has not been treated and disinfected for drinking. The use of recycled water is therefore regulated by the State of California Division of Drinking Water, State Water Resources Control Board to ensure that the public health and potable water supply are separated and protected from contamination. To assure that the use is appropriate, the State has required that users be trained, vehicles and sites are inspected and certified, and appropriate safeguards are in place to protect public health.

10. Do I have to use a special container?
All containers must be properly labeled, per the SBWR RWAP User Agreement. Recycled water is only distributed to certified RWAP Supervisors with registered trucks that have been inspected.

11. Can I store recycled water at my site or commercial business? Yes. Recycled water can be stored on site, with appropriate signage and use management per the User Agreement.

12. Do I have to get certified in multiple cities or will one certification work at all SBWR locations? Recycled Water Access Point Supervisors can be trained and registered at any qualified SBWR water agency.

13. Can I take the recycled water I picked up in one city and take it to another city? Yes. Recycled water purchased from one city may be used in a different city.

14. Can I use a potable meter to access recycled water or do I have to get a special meter? The RWAP meter is different from a potable water meter, so you must use a recycled water RWAP meter when accessing recycled water.

15. Do I need to clean my tank or container before filling it with potable water? Recycled water trucks must be certified and registered to carry water for nonpotable uses only.

16. What if I have multiple tanker trucks?
All trucks must be inspected and registered with SBWR.

17. How much does recycled water cost?
Please contact your water retailer for prices and availability.

18. How do I report my recycled water usage and pay?
It will vary depending on recycled water retailer. Please see your local recycled water retailer for specifics.

15.b
Packet Pg. 607
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Piercy Rd
Yerba Buena Rd at Mongomery Hilll Park
Corie Court
Spring Street and McKendrie
Los Esteros Rd
Hellyer Ave
Spring Street Guadalupe Gardens
Sources: Esri, DeLorme, NAVTEQ, TomTom, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand)

SAN JOSE RECYCLED WATER

TRUCK FILL LOCATIONS
Legend

RW TRUCK FILL ACCESS LOCATIONS

WATER RETAILER

SAN JOSE MUNICIPAL WATER

SAN JOSE WATER COMPANY
0 1 2 3 40.5
Miles
Los Esteros Rd Zanker Rd
Grand Bl
Disk Dr
Nortech Py
Baytech Dr
Oakland Rd
Schallenberger Rd
Pear Orchard Dr
880
Spring St
Ruff Dr
McKendrie St
Yerba Buena Rd
Verona Rd
Falls Creek Dr
Tuscany ClRural Access
Placido Ct
NB 101 ToCoyote Rp
Silver
Creek
Valley Rd
Fontanoso
Wy
Piercy Rd
For additional information call
South Bay Water Recycling (408) 277-3671
San Jose Municipal Water (408) 535-3500
San Jose Water Company (408) 279-7900
Corie Ct
Located 1,100 Feet South of Verona Rd
Los Esteros Station
Gates Open Monday Thru Friday
8:00 AM to 6:00 PM
Located 350 Feet South of Silver Creek Valley Rd
Taylor StEmory StAsbury St
Walnut St
Hedding St
University Av
Spring St
Emory St
Hellyer Av
Eden Park Pl
Piercy Rd
Jenny Ct
Hellyer Av
Silicon Valley
Blvd
Located 1,800 Feet West of Silicon Valley Blvd

15.b
Packet Pg. 608
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Office Hrs:
8:00 am - 12:00 Noon
1:00 pm - 5:00 pm
(Noon - 1:00 pm, Ofc Closed for
SJMWS Staff Lunch Hour)

CITY OF SAN JOSE

MUNICIPAL WATER SYSTEM
3025 TUERS ROAD
SAN JOSE, CA 95121
(408) 277-3671
(408) 277- 4218

CITY OF SAN JOSE

LOS LAGOS

PUBLIC GOLF COURSE

LION FOODCTR

RITE AID
)25 7(0325$5< 0(7(56  &$// 6&+('8/( $ 3,&.83 7,0(
:,7+ $1 (1*,1((5,1* 67$)) 0(0%(5 %()25( &20,1* 72 3,&.
83 $ 0(7(5
'(326,7 2) 
&+(&. 25 &5(',7 &$5'
3(5 0(7(5
(3",Green)

15.b
Packet Pg. 609
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) 87 Guadalupe Fwy
W Taylor St
Spring St
W Hedding St
Coleman Ave
880 Nimitz Fwy
McKendrie St
Ruff Dr
Spring St
North Fill Location
Spring St
South Fill Location
Curie Ct
E Gish Rd
E Brokaw Rd
Oakland Rd
880 Nimitz Fwy
Old Bayshore Hwy
Curie Ct
Fill Location
San Jose Water Company
Recycled Water Fill Locations
Requirements for filling at any of the 3 locations
≠# San Jose Water Co. issued portable non-potable water meter. Deposit required upon receipt of meter. Call 408-279-7835 for more information. ≠# Key to unlock cap.
≠# Certified non-potable water vehicle. Must be certified and permitted through South Bay Water Recycling.
≠# Non-potable hoses with 3" camlock fittings and a wrench to actuate valve. Must be supplied by consumer.
5HF\FOHG:DWHU0HWHU,QIRUPDWLRQ

6DQ-RVH:DWHU&RPSDQ\
6%DVFRP$YH6DQ-RVH&$
0)



%OXHDUHD GHSRVLW

15.b
Packet Pg. 610
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

15.b
Packet Pg. 611
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Revised 7/21/20 Page 1 of 2

RECYCLED WATER ACCESS POINT

PROGRAM USER AGREEMENT
PRODUCER: San Jose/Santa Clara Regional Wastewater Facility - 700 Los Esteros Road, San Jose CA 95134 REGULATORY AGENCY: South Bay Water Recycling - 3025 Tuers Road San Jose, CA 95121 - 408.277.3671 EFFECTIVE DATES OF PERMIT: ________________________________ THROUGH DECEMBER 31ST 2022 License #: SJ-________

USER INFO
TRAINEE NAME: ___________________________________ CSLB CONTRACTOR LICENSE #: __________________________ COMPANY NAME: ___________________________________ TRUCK/TRAILER LICENSE #: ____________________________ COMPANY ADDRESS: ___________________________________ ATTACH YOUR ACORD INSURANCE FORM TO THIS AGREEMENT COMPANY PHONE #: ___________________________________ PLEASE GIVE THIS AGREEMENT TO YOUR OFFICE MANAGER

A USER AGREEMENT MUST BE COMPLETED FOR EACH VEHICLE OPERATOR AND MUST BE RETAINED DURING ACQUISITION AND APPLICATION OF RECYCLED WATER.

USERS AND USERS’ COMPANIES SHALL ADHERE TO THE ATTACHED SBWR TERMS OF USE. USER AGREEMENT IS SUBJECT TO RWQCB ORDER 95-117.

RECYCLED WATER USE INFORMATION (CHECK ALL THAT APPLY)
METHOD OF WATER DISTRIBUTION: [ ] RECYCLED WATER ACCESS POINT [ ] TEMPORARY SITE METER OTHER: _________________________ APPLICATION METHOD: [ ] TANKER TRUCK SPRAY [ ] HOSE O THER: ____________________________________________ USE OF RECYCLED WATER*: [ ] CONSTRUCTION (COMPACTION/DUST CONTROL) [ ] STREET SWEEPING [ ] S EWER CLEAN OUT OTHER*: ______________________________
* REFER TO THE FULL TEXT OF THE LATEST VERSION OF TITLE-22: CALIFORNIA WATER RECYCLING CRITERIA, ARTICLE 3. USES OF RECYCLED WATER, JUNE 18, 2014.

SIGNS REQUIRED: [ ] TANKER TRUCK [ ] CONTAINER [ ] OVERHEAD TANK [ ] PROJECT SITE OTHER: __________________ LOCATION WHERE RECYCLED WATER WILL BE APPLIED:

ADDRESS: ________________________________________ SITE SUPERINTENDENT: ___________________________________________

CERTIFICATION

I HEREBY CERTIFY THAT THE INFORMATION PROVIDED IN THIS APPLICATION AND ALL ATTACHMENTS ARE TRUE, ACCURATE, AND COMPLETE TO THE BEST OF MY KNOWLEDGE. I ALSO CERTIFY THAT I HAVE READ AND AGREE TO ABIDE BY THE SBWR TERMS OF USE AND ALL APPLICABLE RULES AND REGULATIONS OF THE RWQCB ORDER NO. 95-117 AND HAVE SUCCESSFULLY COMPLETED INSPECTION BY THE LOCAL RETAILER. _____________________________________________________________________________________________________________________________________

TRUCK CONTRACTOR/DRIVER/EMPLOYEE SIGNATURE PRINTED NAME TITLE DATE _______________________________________________________________________________________________________________________________________ ** SUPERINTENDENT OR FOREMAN SIGNATURE PRINTED NAME TITLE DATE

LYLE FROHMAN
______________________________________________________________________________________________________________________________________

SBWR SIGNATURE PRINTED NAME DATE

15.b
Packet Pg. 612
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) Revised 7/21/20 Page 2 of 2

RECYCLED WATER ACCESS POINT PROGRAM

TERMS OF USE

PLEASE WASH YOUR HANDS AFTER USING RECYCLED WATER

CHECK THIS
USER AGREEMENT LIMITS THE USE OF RECYCLED WATER TO THE FOLLOWING CONDITIONS:

1. RECYCLED WATER IS FOR NONPOTABLE
USES ONLY - NO DRINKING! Recycled water may not be exposed to food, used within designated eating areas or used within 50 feet of any domestic well, drinking fountain or potable water supply.

2. There shall be no cross-connection between recycled water and any potable water supply. Recycled water may no
t be plumbed into potable irrigation or onsite plumbing systems. Recycled water meters are prohibited from con
necting to potable hydrants. Match purple to purple only 

3. Recycled water may not be discharged into storm drains or outside the designated use area that was approved by the water retailer and/or SBWR. Overspray, pooling and runoff of recycled water is not permitted. Cover this in yo
ur Safety meetings.

4. Tan
ker trucks must maintain an air gap of at least twice the diameter of the fill pipe (i.e. water overflows the tank before r
eaching the fill pipe). Tanker trucks must have water-tight connections, piping and hoses to ensure no
leakage will occur during fill-up or use. They must be fully drained before transport and prior to every connection.
 5.

Recycled water tanker trucks may not transport potable water for potable uses.  6.

All tanker trucks accessing and hauling recycled water must satisfy local and state safety requirements. Active auto/truck/trailer and general liability insurance (i.e. an ACORD form) is required. 

7. Recycled water meters may be inspected by the retailer for appropriate use at any time. The volume of recycled water used must be reported as specified by the recycled water retailer.

SPECIAL

APPROVAL, TRAINING AND SITE INSPECTION REQUIRED
 8.

If recycled water is transferred to other storage containers/reservoirs, they must be labeled with signage equivalent to tanker truck signage and must follow the safety guidelines in this User Agreement.  9.

Recycled water may be used for pressure washing and washing equipment and vehicles if the recycled water is not heated and where the general public is excluded from the washing process.  10.

Recycled Water may not be used for directional drilling without prior approval from SBWR.

ADV

ISORY SIGNS

Tan
ker Truck Sign: Tanker trucks hauling recycled water must have an SBWR approved adhesive sign issued by retailer at l
east six inches by twelve inches on the tank, in a location clearly visible to users and workers, with the following wording in one inch, or larger, letters on a purple background. 
Tan
ker Truck Inspection Decal: Tanker trucks hauling recycled water must have an SBWR approved adhesive decal is
sued by retailer at least three inches by six inches signifying that the tanker truck has passed inspection and met all SBWR requirements.

App
urtenance Sign: Appurtenances serving recycled water must have an SBWR approved adhesive or bolted sign is
sued by the retailer at least six inches by eight inches, in a location clearly visible to users and workers, with the following wording in one inch, or larger, letters on a purple background.

15.b
Packet Pg. 613
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project) App XI
Appendix XI:

California Prevailing Wage Rates

15.b
Packet Pg. 614
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Renovation Project)

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Boilermaker-Blacksmith #
Determination:

C-14-X-2-2021-1
Issue Date:

February 22, 2021
Expiration date of determination:

September 30, 2021* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Division of Labor Statistics and Research at (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.

Localities:

All localities within the State of California
Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pensiona Vacation
and
Holiday
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Boilermaker-Blacksmith
(Area 1)b $46.03 $8.57 $18.44c $7.90c $3.90 $0.74 8.0 $85.58 $121.765d $121.765d $157.95 Boilermaker-Blacksmith
(Area 2)b $49.62 $8.57 $22.30c $6.00c $4.40 $0.74 8.0 $91.63 $130.59d $130.59d $169.55 Boilermaker-Blacksmith
(Area 3)b $45.60 $8.57 $20.52c $5.50c $4.40 $0.74 8.0 $85.33 $121.14d $121.14d $156.95

15.b
Packet Pg. 615
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-14-X-2-2021-1

Page 2 of 3 ends

Determination:

C-14-X-2-2021-1
Issue Date:

February 22, 2021
Expiration date of determination:

September 30, 2021* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Division of Labor Statistics and Research at (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.

Localities:

All localities within the State of California
Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pensiona Vacation
and
Holiday
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Boilermaker-Blacksmith
Helpere (Area 1)b $25.32 f $0.73c $0.00 $3.90 $0.74 8.0 $30.69 $43.715d $43.715d $56.74 Boilermaker-Blacksmith
Helpere (Area 2)b $27.29 f $0.73c $0.00 $4.40 $0.74 8.0 $33.16 $47.17d $47.17d $61.18 Boilermaker-Blacksmith
Helpere (Area 3)b $25.08 f $0.73c $0.00 $4.40 $0.74 8.0 $30.95 $43.855d $43.855d $56.76

Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing

15.b
Packet Pg. 616
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-14-X-2-2021-1

Page 3 of 3 ends

Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a Includes amount for Annuity Trust Fund.
b Area 1: Imperial, Inyo, Kern, Los Angeles, Orange, Riverside, San Bernardino, San Diego, Santa Barbara, San Luis Obispo (only that portion that is within a 25-mile radius of the city of Santa Maria), and Ventura Counties.

Area 2: Alameda, Contra Costa, Marin, Monterey, Sacramento, San Francisco, San Mateo, Santa Clara, Santa Cruz, Solano and Sonoma Counties.

Area 3: All other remaining counties.
c Contribution is factored at the applicable overtime multiplier for each overtime hour worked. d Rate applies to the first 2 daily overtime hours and the first 10 hours worked on Saturday. All other overtime is paid at the Sunday/Holiday rate. e One Helper shall be employed on each job of 5 to 10 employees. f Helpers will be eligible for Health & Welfare benefits after completing 2000 hours.

15.b
Packet Pg. 617
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Iron Worker #
Determination:

C-20-X-1-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

December 31, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

Area 1: San Francisco County.

Area 2: Alameda, Contra Costa, San Mateo and Santa Clara County Area 3: City of Los Angeles and the following cities/localities within Los Angeles County: Baldwin Hills, Beverly Hills, Burbank, Culver City, El Segundo, Gardena, Hawthorne, Hermosa Beach, Inglewood, Lawndale, Lennox, Lomita, Manhattan Beach, Marina Del Rey, Rancho Palos Verdes, Redondo Beach, Rolling Hills Estates, San Fernando, Santa Monica, Torrance, Universal City, West Hollywood, Westwood Veterans Affairs.

Area 4: Amador, Butte, Calaveras, Colusa, El Dorado, Fresno, Glenn, Humboldt, Imperial, Kern, Kings, Lake, Los Angeles (portions not covered in Area 3), Madera, Marin, Mariposa, Mendocino, Merced, Monterey, Napa, Nevada, Orange, Placer, Plumas, Riverside, Sacramento, San Benito, San Bernardino, San Diego, San Joaquin, San Luis Obispo, Santa Barbara, Santa Cruz, Shasta, Sierra, Solano, Sonoma, Stanislaus, Sutter, Tehama, Tulare, Tuolumne, Ventura, Yolo and Yuba Counties Area 5: Alpine, Del Norte, Inyo, Lassen, Modoc, Mono, Siskiyou and Trinity Counties Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidaya
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)b
Saturday
Overtime
Hourly
Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Iron Worker (Ornamental,
Reinforcing, Structural)
(Area 1)
$50.38 $10.20 $12.32 $6.00 $0.72 $5.565 8.0 $85.185 $110.375 $110.375 $135.565

15.b
Packet Pg. 618
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-20-X-1-2023-1

Page 2 of 2 ends

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidaya
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)b
Saturday
Overtime
Hourly
Rate
(1 ½ X)b
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Iron Worker (Ornamental,
Reinforcing, Structural)
(Area 2)
$49.88 $10.20 $12.32 $6.00 $0.72 $5.565 8.0 $84.685 $109.625 $109.625 $134.565 Iron Worker (Ornamental,
Reinforcing, Structural)
(Area 3)
$47.73 $10.20 $12.32 $6.00 $0.72 $5.565 8.0 $82.535 $106.400 $106.400 $130.265 Iron Worker (Ornamental,
Reinforcing, Structural)
(Area 4)
$46.20 $10.20 $12.32 $6.00 $0.72 $5.565 8.0 $81.005 $104.105 $104.105 $127.205 Iron Worker (Ornamental,
Reinforcing, Structural)
(Area 5)
$41.00 $10.20 $12.32 $5.40 $0.72 $5.565 8.0 $75.205 $95.705 $95.705 $116.205 Fence Erector (All Areas) $41.28 $8.03 $8.99 $4.62 $0.51 $3.685 8.0 $67.115 $87.755 $87.755 $108.395 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a Includes supplemental dues
b Rate applies to the first 2 daily overtime hours and the first 8 hours on Saturday. All other overtime is at the Sunday/Holiday rate.

15.b
Packet Pg. 619
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Electrical Utility Lineman #
Determination:

C-61-X-3-2022-1
Issue Date:

August 22, 2022
Expiration date of determination:

May 31, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774
Localities:

All localities within the State of California, except Del Norte, Modoc, and Siskiyou Counties. (For Del Norte, Modoc and Siskiyou - see determination C-61-X-8)
Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(2 X)
Saturday
Overtime
Hourly
Rate
(2 X)
Sunday/
Holiday
Overtime
Hourly
Rate
Lineman, Cable Splicer # $64.40 $8.00 $12.33a $0.32b $0.70c 8.0 $87.68 $155.02 $155.02 $155.02 Powderman $55.90 $8.00 $11.59a $0.28b $0.61c 8.0 $78.06 $136.52 $136.52 $136.52 Groundman $38.23 $8.00 $11.55a $0.19b $0.42c 8.0 $59.54 $99.52 $99.52 $99.52

15.b
Packet Pg. 620
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determinations: C-61-X-3-2022-1 and C-61-X-4-2023-1

Page 2 of 4 ends

Determination:

C-61-X-4-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

December 31, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774
Localities:

All localities within the State of California, except Del Norte, Imperial, Inyo, Kern, Kings, Los Angeles, Modoc, Mono, Orange, Riverside, San Bernardino, San Diego, San Luis Obispo, Santa Barbara, Siskiyou, Tulare, and Ventura Counties. (For Del Norte, Modoc, and Siskiyou – see determination C-61-X-8. For Imperial, Inyo, Kern, Kings, Los Angeles, Mono, Orange, Riverside, San Bernardino, San Diego, San Luis Obispo, Santa Barbara, Tulare, and Ventura Counties– see determination C-61-X-5) Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holiday
Hours Total
Hourly
Rate
Daily Overtime
Hourly Rate
(1 ½ X)
Saturday
Overtime
Hourly Rate
(1 ½ X)
Sunday/
Holiday Overtime
Hourly Rate
(1 ½ X)
Pole Restoration
Journeyman $34.74 $7.50d $2.00a $1.47 8.0 $46.75 $64.64 $64.64e $64.64 After 1 year $34.74 $7.50d $2.00a $2.14 8.0 $47.42 $65.31 $65.31e $65.311 After 3 years $34.74 $7.50d $2.00a $2.81 8.0 $48.09 $65.98 $65.98e $65.98 After 6 years $34.74 $7.50d $2.00a $3.47 8.0 $48.75 $66.64 $66.64e $66.64 Senior Technicianf $22.42 $7.50d $1.60a $0.95 8.0 $33.14 $44.69 $44.69e $44.69 After 1 year $22.42 $7.50d $1.60a $1.38 8.0 $33.57 $45.12 $45.12e $45.12 After 3 years $22.42 $7.50d $1.60a $1.81 8.0 $34.00 $45.55 $45.55e $45.55

15.b
Packet Pg. 621
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determinations: C-61-X-3-2022-1 and C-61-X-4-2023-1

Page 3 of 4 ends

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holiday
Hours Total
Hourly
Rate
Daily Overtime
Hourly Rate
(1 ½ X)
Saturday
Overtime
Hourly Rate
(1 ½ X)
Sunday/
Holiday Overtime
Hourly Rate
(1 ½ X)
After 6 years $22.42 $7.50d $1.60a $2.24 8.0 $34.43 $45.98 $45.98e $45.98 Pole Treatment
Journeyman $31.04 $7.50d $2.00a $1.32 8.0 $42.79 $58.78 $58.78e $58.78 After 1 year $31.04 $7.50d $2.00a $1.92 8.0 $43.39 $59.375 $59.375e $59.375 After 3 years $31.04 $7.50d $2.00a $2.51 8.0 $43.98 $59.97 $59.97e $59.97 After 6 years $31.04 $7.50d $2.00a $3.11 8.0 $44.58 $60.565 $60.565e $60.565 Pole Restoration and
Treatmentf
Technician
$20.16 $7.50d $1.10a $0.85 8.0 $30.21 $40.60 $40.60e $40.60 After 1 year $20.16 $7.50d $1.10a $1.24 8.0 $30.60 $40.99 $40.99e $40.99 After 3 years $20.16 $7.50d $1.10a $1.63 8.0 $30.99 $41.38 $41.38e $41.38 After 6 years $20.16 $7.50d $1.10a $2.01 8.0 $31.37 $41.76 $41.76e $41.76 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreW ageDetermination.htm). Holiday provisions for
current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In ac
cordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

15.b
Packet Pg. 622
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determinations: C-61-X-3-2022-1 and C-61-X-4-2023-1

Page 4 of 4 ends

# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a In addition, an amount equal to 3% of the Basic Hourly Rate is added to the Total Hourly Rate and overtime hourly rates for the National Employees Benefit Board
b This amount is factored at the applicable overtime rate. c Includes $0.01 to LMCC; the remaining amount is factored at the applicable overtime rate. d Includes an amount for Health Reimbursements Accounts. e Saturdays may be scheduled as a make-up day at the regular straight time rate. f The Ratio of Technicians to Journeymen may not exceed 4 to 1. However, if the Journeyman is assisted by a maximum of two Senior Technicians, three additional Technicians may be added per Senior Technician

15.b
Packet Pg. 623
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Electrical Utility Lineman
Determination:

C-61-X-5-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

December 31, 2023* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.

Localities:

All localities within Imperial, Inyo, Kern, Kings, Los Angeles, Mono, Orange, Riverside, San Bernardino, San Diego, San Luis Obispo, Santa Barbara, Tulare, and Ventura Counties.

Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfared
Pension Vacation
and
Holiday
Hours Total
Hourly
Rate
Daily
Overtime
Hourly Rate
(1 ½ X)
Saturday
Overtime
Hourly Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(1 ½ X)
Pole Restoration Journeyman $34.74 $7.50 $2.00a $0.00 8.0 $45.28 $63.17 $63.17b $63.17 After 6 months $34.74 $7.50 $2.00a $1.77 8.0 $47.05 $64.94 $64.94b $64.94 After 3 years $34.74 $7.50 $2.00a $2.63 8.0 $47.91 $65.80 $65.80b $65.80 After 6 years $34.74 $7.50 $2.00a $3.10 8.0 $48.38 $66.27 $66.27b $66.27 After 10 years $34.74 $7.50 $2.00a $3.50 8.0 $48.78 $66.67 $66.67b $66.67 Senior Technician c $22.42 $7.50 $1.60a $0.00 8.0 $32.19 $43.74 $43.74b $43.74 After 6 months $22.42 $7.50 $1.60a $1.14 8.0 $33.33 $44.88 $44.88b $44.88 After 3 years $22.42 $7.50 $1.60a $1.70 8.0 $33.89 $45.43 $45.43b $45.43 After 6 years $22.42 $7.50 $1.60a $2.00 8.0 $34.19 $45.73 $45.73b $45.73 After 10 years $22.42 $7.50 $1.60a $2.26 8.0 $34.45 $45.99 $45.99b $45.99 Pole Treatment Journeyman $31.04 $7.50 $2.00a $0.00 8.0 $41.47 $57.46 $57.46b $57.46 After 6 months $31.04 $7.50 $2.00a $1.58 8.0 $43.05 $59.04 $59.04b $59.04 After 3 years $31.04 $7.50 $2.00a $2.35 8.0 $43.82 $59.81 $59.81b $59.81 After 6 years $31.04 $7.50 $2.00a $2.77 8.0 $44.24 $60.22 $60.22b $60.22 After 10 years $31.04 $7.50 $2.00a $3.13 8.0 $44.60 $60.58 $60.58b $60.58

15.b
Packet Pg. 624
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-61-X-5-2023-1

Page 2 of 2 ends

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfared
Pension Vacation
and
Holiday
Hours Total
Hourly
Rate
Daily
Overtime
Hourly Rate
(1 ½ X)
Saturday
Overtime
Hourly Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(1 ½ X)
Pole Restoration and Treatment c
Technician (First 6 months)

$19.16

$7.50

$1.10a

$0.00

8.0 $28.33

$38.20

$38.20b

$38.20
Pole Restoration and Treatment c
Technician (After 6 months)

$19.16

$7.50

$1.10a

$0.98

8.0 $29.31

$39.17

$39.17b

$39.17
Pole Restoration and Treatment c
Technician (After 3 years)

$19.16

$7.50

$1.10a

$1.45

8.0 $29.78

$39.65

$39.65b

$39.65
Pole Restoration and Treatment c
Technician (After 6 years)

$19.16

$7.50

$1.10a

$1.71

8.0 $30.04

$39.90

$39.90b

$39.90
Pole Restoration and Treatment c
Technician (After 10 years)

$19.16

$7.50

$1.10a

$1.93

8.0 $30.26

$40.13

$40.13b

$40.13
Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

a In addition, an amount equal to 3% of the Basic Hourly Rate is added to the Total Hourly Rate and overtime hourly rates for the National Employees Benefit Board.
b Saturdays may be scheduled as a make-up day at the regular straight time rate. c The Ratio of Technicians to Journeymen may not exceed 4 to 1. However, if the Journeyman is assisted by a maximum of two Senior Technicians, three additional Technicians may be added per Senior Technician. d Health and Welfare includes $0.50 for Health Reimbursement Account.

15.b
Packet Pg. 625
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Electrical Utility Lineman #
Determination:

C-61-X-8-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

January 31, 2024* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.

Localities:

All localities within Del Norte, Modoc and Siskiyou counties.

Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pensiona Trainingb Otherc Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(2X)
Saturday
Overtime
Hourly
Rate
(2X)
Sunday/
Holiday
Overtime
Hourly
Rate
(2X)
Lineman, Heavy Line
Equipment man, Certified
Lineman Welder, Pole Sprayer
$60.54 $8.00 $15.97 $0.91 $0.15 8.0 $85.57 $148.99 $148.99 $148.99 Cable Splicer $67.80 $8.00 $16.18 $1.02 $0.17 8.0 $93.17 $164.19 $164.19 $164.19 Line Equipment Operator $52.06 $8.00 $12.51 $0.78 $0.13 8.0 $73.48 $128.01 $128.01 $128.01 Powderman $45.41 $7.90 $9.51 $0.68 $0.11 8.0 $63.61 $111.17 $111.17 $111.17 Groundman First 1040 Hours $24.22 $7.90 $8.88 $0.36 $0.06 8.0 $41.42 $66.79 $66.79 $66.79 Groundman 1041-2080 Hours $30.27 $7.90 $9.06 $0.45 $0.08 8.0 $47.76 $79.47 $79.47 $79.47 Groundman 2081+ Hours $37.53 $7.90 $9.28 $0.56 $0.09 8.0 $55.36 $94.67 $94.67 $94.67 Pole Sprayer Trainee First six
months $51.88 $7.90 $9.71 $0.78 $0.13 8.0 $70.40 $124.75 $124.75 $124.75 Pole Sprayer Trainee Second
six months $54.36 $7.90 $9.78 $0.82 $0.14 8.0 $73.00 $129.95 $129.95 $129.95 Pole Sprayer Trainee Third six
months $56.18 $7.90 $9.84 $0.84 $0.14 8.0 $74.90 $133.75 $133.75 $133.75

15.b
Packet Pg. 626
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-61-X-8-2023-1

Page 2 of 2 ends

Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a Includes an amount equal to 3% of the Basic Hourly Rate for the National Employees Benefit Board. This amount is factored at the applicable overtime rate. Pursuant to Labor Code Sections 1773.1 and 1773.8, the amount paid for this employer payment may vary resulting in a lower taxable basic hourly wage rate, but the total hourly rates for straight time and overtime may not be less than the general prevailing rate of per diem wages.
b This amount is factored at the applicable overtime rate. c This amount is for the Administrative Maintenance Fund (AMF) and is factored at the applicable overtime rate.

15.b
Packet Pg. 627
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Telecommunications Technician
Determination:

C-422-X-1-2022-2
Issue Date:

August 22, 2022
Expiration date of determination:

April 1, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director – Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within San Francisco, San Mateo and Santa Clara Counties.

Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidaya
Training Hours Total
Hourly
Rate
Overtime
Hourly
Rate
(1 ½ X)b
Holiday
Overtime
Hourly
Rate
(2 ½ X)
Telecommunications Technician $47.32 $7.65 $4.06 $3.28 $0.00 8.0 $62.31 $85.97 $133.29

a $4.19 employees with 7 years of service but less than 15 years, $5.10 for 15 years but less than 25 years, $6.01 for over 25 years. b Rate applies to work in excess of eight hours daily and for all hours over 40 hours in a week. Rate applies to all hours worked on Sunday.

15.b
Packet Pg. 628
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-422-X-1-2022-2

Page 2 of 3 ends

Determination:

C-422-X-1-2022-2A
Issue Date:

August 22, 2022
Expiration date of determination:

April 1, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director – Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Contra Costa, Los Angeles, Marin, Orange, Riverside, San Diego and Ventura Counties.

Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayc
Training Hours Total
Hourly
Rate
Overtime
Hourly
Rate
(1 ½ X)b
Holiday
Overtime
Hourly
Rate
(2 ½ X)
Telecommunications Technician $46.32 $7.65 $3.97 $3.21 $0.00 8.0 $61.15 $84.31 $130.63

c $4.10 for employees with 7 years of service but less than 15 years, $4.99 for 15 years but less than 25 years, $5.88 for over 25 years.

15.b
Packet Pg. 629
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-422-X-1-2022-2

Page 3 of 3 ends

Determination:

C-422-X-1-2022-2B
Issue Date:

August 22, 2022
Expiration date of determination:

April 1, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director – Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alpine, Amador, Butte, Calaveras, Colusa, El Dorado, Fresno, Glenn, Humboldt, Imperial, Kern, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Joaquin, San Luis Obispo, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo and Yuba.

Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holidayd
Training Hours Total
Hourly
Rate
Overtime
Hourly
Rate
(1 ½ X)b
Holiday
Overtime
Hourly
Rate
(2 ½ X)
Telecommunications Technician $45.07 $7.65 $3.87 $3.12 $0.00 8.0 $59.71 $82.245 $127.315 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). H oliday provisions for
current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In ac
cordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

d $3.99 for employees with 7 years of service but less than 15 years, $4.85 for 15 years but less than 25 years, $5.72 for over 25 years.

15.b
Packet Pg. 630
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Telecommunications Technician
Determination:

C-422-X-10-2023-1
Issue Date:

February 22, 2023
Expiration date of determination: April 1, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director – Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Del Norte, Inyo, Mono, San Bernardino and Santa Barbara Counties.

Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holiday a
Training Hours Total
Hourly
Rate
Overtime
Hourly
Rate
(1 ½ X) b
Holiday
Overtime
Hourly
Rate
(2 ½ X)
Telecommunications Technician $45.07 $8.27 $3.87 $3.12 $0.00 8.0 $60.33 $82.865 $127.935 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing

a $3.99 for employees with 7 years of service but less than 15 years, $4.85 for 15 years but less than 25 years, $5.72 for 25 years or more. b Rate applies to work in excess of eight hours daily and for all hours over 40 hours in a week. Rate applies to all hours worked on Sunday.

15.b
Packet Pg. 631
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-422-X-10-2023-1

Page 2 of 2 ends

Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

15.b
Packet Pg. 632
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Stator Rewinder #
Determination:

C-738-1412-7-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

March 31, 2023* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director – Research Unit at (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.

Localities:

All localities within the State of California
Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation Holiday Training Hours Total
Hourly
Ratea
Daily
Overtime
Hourly
Rate
(1 ½ X)ab
Saturday
Overtime
Hourly
Rate
(1 ½ X)ab
Sunday
Overtime
Hourly
Rate
(2 X)a
Holiday
Overtime
Hourly
Rate
(2 ½ X)a
Stator Rewinder $15.50 $1.39c $2.23c $0.30cd $0.60 $0.30c 8.0 $20.31 $30.17 $30.17 $40.02 $49.88 Stator Rewinder
Helper
$15.50 $1.39c $2.23c $0.30cd $0.60 $0.30c 8.0 $20.31 $30.17 $30.17 $40.02 $49.88

Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing

15.b
Packet Pg. 633
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-738-1412-7-2023-1

Page 2 of 2 ends

Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. # Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a Does not include any additional amount that may be required for vacation pay. b Rate applies to the first 4 daily overtime hours and the first 12 hours on Saturday. After 12 hours daily, the Sunday double-time rate applies. c Contributions are factored at the appropriate overtime multiplier. d Rate applies to the first two years of employment only: for employment over two years, $0.60 per hour worked; for employment over five years, $0.75 per hour worked; for employment over seven years, $0.89 per hour worked; for employment over fifteen years, $1.19 per hour worked; for employment over twenty years, $1.49 per hour worked; for employment over thirty years, $1.79 per hour worked.

15.b
Packet Pg. 634
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Driver (On/Off-Hauling To/From Construction Site) Determination:

C-DT-830-261-
7-2021-1
Issue Date:

February 22, 2021
Expiration date of determination:

March 30, 2021* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the Director - Research Unit at (415) 703-4774 for new rates after 10 days from expiration date, if no subsequent determination is issued.

Localities:

All localities within Alameda, Contra Costa, Del Norte, Humboldt, Lassen, Modoc, San Francisco, San Mateo, Santa Clara, Shasta, Siskiyou and Trinity Counties.

Wages and Employer Payments:

Classification
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holiday
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(1 ½ X)
Driver: Dump Truck $22.50 $0-
a $0.00 $0.43b $0.00 $0.00 8.0 $22.93 $34.18c $34.18
Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing
Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

15.b
Packet Pg. 635
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-DT-830-261-7-2021-1

Page 2 of 2 ends

* There is no predetermined increase applicable to this determination. a Health and Welfare will increase from $0.00 to $1.16 after 90 days of service, which will be seen as an increase to the Total Hourly Rate as well.
b $0.78 after 90 days of service with the employer
$1.21 after 5 years of service with the employer
$1.65 after 10 years of service with the employer
c Rate applies to work in excess of eight (8) hours daily and forty (40) hours weekly.

15.b
Packet Pg. 636
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Metal Roofing Systems Installer#
Determination:

C-MR-2022-1J
Issue Date:

August 22, 2022
Expiration date of determination:

July 2, 2023 ** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within San Francisco, San Mateo and Santa Clara Counties. (REF: 166-104-1) Wages and Employer Payments:

Classification
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holiday
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Metal Roofing Systems
Installer $69.07a $15.02b $32.29c d $1.65 $0.71 8.0e $118.74 $157.11f $157.11f $195.48 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). H oliday provisions for
current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In ac
cordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

15.b
Packet Pg. 637
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-MR-2022-1J

Page 2 of 7 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Metal Roofing Systems Installer (Special Single Shift)# Determination:

C-MR-2022-1JA
Issue Date:

August 22, 2022
Expiration date of determination:

July 2, 2023 ** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within San Francisco, San Mateo and Santa Clara Counties. (REF: 166-104-1) Wages and Employer Payments:

Classification
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holiday
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Metal Roofing Systems
Installer $77.36a $15.02b $32.29c d $1.65 $0.71 8.0e $127.03 $169.55f $169.55f $212.06 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm).

Holiday provisions for
current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

15.b
Packet Pg. 638
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-MR-2022-1J

Page 3 of 7 ends

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

15.b
Packet Pg. 639
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-MR-2022-1J

Page 4 of 7 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Metal Roofing Systems Installer (Second Shift)#
Determination:

C-MR-2022-1JA
Issue Date:

August 22, 2022
Expiration date of determination:

July 2, 2023 ** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within San Francisco, San Mateo and Santa Clara Counties. (REF: 166-104-1) Wages and Employer Payments:

Classification
Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holiday
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Metal Roofing Systems
Installer $75.98a $15.02b $32.29c d $1.65 $0.71 7.5e $125.65 $167.48f $167.48f $209.30 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm).

Holiday provisions for
current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

15.b
Packet Pg. 640
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-MR-2022-1J

Page 5 of 7 ends

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

15.b
Packet Pg. 641
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-MR-2022-1J

Page 6 of 7 ends

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Metal Roofing Systems Installer (Third Shift)#
Determination:

C-MR-2022-1JA
Issue Date:

August 22, 2022
Expiration date of determination:

July 2, 2023 ** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within San Francisco, San Mateo and Santa Clara Counties. (REF: 166-104-1) Classification
Wages and Employer Payments:

Basic
Hourly
Rate
Health
and
Welfare
Pension Vacation
and
Holiday
Training Other Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Metal Roofing Systems
Installer $79.43a $15.02b $32.29c d $1.65 $0.71 7.0 $129.10 $172.65f $172.65f $216.20 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). H oliday provisions for
current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

15.b
Packet Pg. 642
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-MR-2022-1J

Page 7 of 7 ends

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

# Indicates an apprenticeable craft. The current apprentice wage rates are available on the Prevailing Wage Apprentice Determinations Website (http://www.dir.ca.gov/OPRL/PWAppWage/PWAppWageStart.asp). a Includes amount for Vacation/Holiday and Dues Check Off. b Includes SMOHIT and SHC. Effective 1/1/2013, pursuant to Labor Code Sections 1773.1 and 1773.8, the amount paid for this employer payment may vary resulting in a lower taxable basic hourly wage rate, but the total hourly rates for straight time and overtime may not be less than the general prevailing rate of per diem wages.
c Includes an amount for Pension which is factored at the applicable overtime multiplier. Pursuant to Labor Code Sections 1773.1 and 1773.8, the amount paid for this employer payment may vary resulting in a lower taxable basic hourly wage rate, but the total hourly rates for straight time and overtime may not be less than the general prevailing rate of per diem wages. d Included in Straight-Time Hourly Rate.
e For San Francisco County, the Straight-Time Hours is 7 hours. f For San Francisco County: Rate applies to the first 2 daily overtime hours and the first 7 hours on Saturday only. All other time is paid at the Sunday and Holiday overtime hourly rate.

For San Mateo and Santa Clara Counties: Rate applies to the first 2 daily overtime hours and the first 8 hours on Saturday only. All other time is paid at the Sunday and Holiday overtime hourly rate.

15.b
Packet Pg. 643
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Driver (On/Off-Hauling To/From Construction Site) Determination:

C-MT-261-X-260-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

June 30, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Contra Costa, San Francisco, and Santa Clara Counties.

Wages and Employer Payments:

Classification
Basic
Hourly
Ratea
Health
and
Welfareb
Pension Vacation
and
Holiday
Training Otherc Hours Total
Hourly
Rate
Daily
Overtime
Hourly
Rate
(1 ½ X)
Saturday
Overtime
Hourly
Rate
(1 ½ X)
Sunday/
Holiday
Overtime
Hourly
Rate
(2 X)
Conventional Trucks
(3 axles or less, 8 yards or
less)d
$44.32 $12.91 $13.26 $2.90e $0.00 $1.69 8.0 $75.08 $97.24 $97.24 $119.40 Booster Trucks
(4 axles or more, 10 yards or
less)
f
$44.58 $12.91 $13.26 $2.91g $0.00 $1.70 8.0 $75.36 $97.65 $97.65 $119.94 Slider (12 yards) $45.08 $12.91 $13.26 $2.95h $0.00 $1.71 8.0 $75.91 $98.45 $98.45 $120.99 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the

15.b
Packet Pg. 644
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-MT-261-X-260-2023-1

Page 2 of 2 ends

Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. a An amount up to $38.40 per 8 hour day ($4.80 per hour) for a maximum of 5 days per week may be deducted for Health and Welfare. The deduction is limited to the first 173.33 hours worked per month. This is in addition to the $12.60 per hour employer payment for Health and Welfare.
b The contribution applies to all hours until $2,179.00 is paid for the month. c Includes amounts for sick leave.
d Add $0.07 per hour to the basic hourly rate for each yard or portion of yard hauled over 8 yards. e $3.24 after 2 years of service, $3.58 after 3 years of service, $4.43 after 5 years of service, $5.28 after 10 years of service, $6.14 after 20 years of service.
f Add $0.09 per hour to the basic hourly rate for each yard or portion of yard hauled over 10 yards. g $3.26 after 2 years of service, $3.60 after 3 years of service, $4.46 after 5 years of service, $5.32 after 10 years of service, $6.17 after 20 years of service.
h $3.29 after 2 years of service, $3.64 after 3 years of service, $4.51 after 5 years of service, $5.37 after 10 years of service, $6.24 after 20 years of service.

15.b
Packet Pg. 645
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTI CLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECT S Craft: Tree Trimmer (High Voltage Line Clearance)
Determination:

C-TT-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

M
ay 31, 2023** The rate to be paid for work performed af ter this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

All localities within Alameda, Alpine, Amador, Butte, Calaveras, Colusa, Contra Costa, El Dorado, Fresno, Glenn, Humboldt, Imperial, Inyo, Kern, Kings, Lake, Lassen, Los Angeles, Madera, Marin, Mariposa, Mendocino, Merced, Mono, Monterey, Napa, Nevada, Orange, Placer, Plumas, Riverside, Sacramento, San Benito, San Bernardino, San Diego, San Francisco, San Joaquin, San Luis Obispo, San Mateo, Santa Barbara, Santa Clara, Santa Cruz, Shasta, Sierra, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Ventura, Yolo, and Yuba Counties. (REF: 61-1245-12, 61-465-5, 61-465-5A, 61-47-3) Wages and E
mployer Payments:

Classification
Basic
Hourly
Rate
Health
and
Welfarea
Pensionb Vacation Holiday Training Otherc Hours Total
Hourly
Rate
Daily/Saturday/
Sunday Overtime
Hourly Rate
(2X)
Tree Trimmer $39.26 $8.00 $11.28 $0.79 $0.00 $0.59 $0.04 8.0 $59.96 $100.40 Trimmer Trainee: Start (0-6
Months) $27.48 $8.00 $7.48 $0.55 $0.00 $0.41 $0.03 8.0 $43.95 $72.25 Trimmer Trainee: 6-12
Months $31.41 $8.00 $8.75 $0.63 $0.00 $0.47 $0.03 8.0 $49.29 $81.64 Trimmer Trainee: After 12
Months $35.33 $8.00 $10.02 $0.71 $0.00 $0.53 $0.04 8.0 $54.63 $91.02 Ground person First 6
Months $23.55 $8.00 $1.62 $0.47 $0.00 $0.35 $0.02 8.0 $34.01 $58.27 Ground person After 6
Months $25.52 $8.00 $2.35 $0.51 $0.00 $0.38 $0.03 8.0 $36.79 $63.08

15.b
Packet Pg. 646
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-TT-2023-1

Page 2 of 2 ends

Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. a Includes an amount for Health Reimbursements Accounts. b Includes an amount equal to 3% of the Basic Hourly Rate for the National Employees Benefit Board which is factored at the applicable overtime multiplier. Pursuant to Labor Code Sections 1773.1 and 1773.8, the amount paid for this employer payment may vary resulting in a lower taxable basic hourly wage rate, but the total hourly rates for straight time and overtime may not be less than the general prevailing rate of per diem wages. Includes amount for National Electrical Annuity Plan. c Includes an amount for Administrative Maintenance Fund.

15.b
Packet Pg. 647
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Tree Trimmer (High Voltage Line Clearance)
Determination:

C-TT-061-659-12-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

December
31, 2023* Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Office of the
Director - Research Unit at (415) 703-4774 for the new rates after 10 days from the expiration date, if no subsequent determination is issued.

Localities
:

All localities within Del Norte, Modoc, and Siskiyou Counties.

Wages and Em
ployer Payments:

Classification
Basic
Hourly
Rate
Health
and
Welfare
Pensiona Vacation Holiday Trainingb Hours Total
Hourly
Rate
Daily/Saturday/
Sunday Overtime
Hourly Rate
(2X)
Tree Trimmer $38.34 $7.00 $7.15 $0.58 $0.00 $0.58 8.0 $53.65 $93.71 Ground person First Year $21.49 $7.00 $4.14 $0.00 $0.00 $0.32 8.0 $32.95 $55.41 Ground person After
Second Year $24.97 $7.00 $4.32 $0.00 $0.00 $0.37 8.0 $36.66 $62.76 Recognized holidays:

Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Director's General Prevailing Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Holiday provisions for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774.

Travel and/or subsistence payment:

In accordance with Labor Code Sections 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Director's General Prevailing

15.b
Packet Pg. 648
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: C-TT-061-659-12-2023-1

Page 2 of 2 ends

Wage Determinations Website (http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm). Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Office of the Director – Research Unit at (415) 703-4774. a Includes an amount equal to 3% of the Basic Hourly Rate for the National Employees Benefit Board which is factored at the applicable overtime multiplier. Pursuant to Labor Code Sections 1773.1 and 1773.8, the amount paid for this employer payment may vary resulting in a lower taxable basic hourly wage rate, but the total hourly rates for straight time and overtime may not be less than the general prevailing rate of per diem wages. Includes amount for National Electrical Annuity Plan. b This amount is factored at overtime rates.

15.b
Packet Pg. 649
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS LOCALITY: SANTA CLARA COUNTY
DETERMINATION: STC-2023-1

CRAFT CLASSIFICATION CRAFT

FOOTNOTE
ISSUE
DATE

EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE

FOOTNOTE
HEALTH
AND

WELFARE
HEALTH
AND

WELFARE

FOOTNOTE

PENSION PENSION

FOOTNOTE

VACATION/

HOLIDAY

VACATION/

HOLIDAY

FOOTNOTE

TRAINING TRAINING

FOOTNOTE
OTHER

PAYMENTS
OTHER

PAYMENTS

FOOTNOTE

HOURS HOURS

FOOTNOTE

STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE

FOOTNOTE

SATURDAY

OVERTIME
HOURLY
RATE

SATURDAY

OVERTIME
HOURLY
RATE

FOOTNOTE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE

FOOTNOTE

HOLIDAY

PROVISIONS

SCOPE OF
WORK

PROVISIONS

TRAVEL &

SUBSISTENCE

PROVISIONS
SHIFT

PROVISIONS
#BRICKLAYER,

BLOCKLAYER,

POINTER, CLEANER,

CAULKER,

WATERPROOFER
(2ND SHIFT)
08/22/2022 06/30/2023
* $65.210 A $11.100 $13.620 $0.000 B $1.630 $0.430 8.0 C $91.990 $124.600 $124.600 D $157.200 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#BRICKLAYER,

BLOCKLAYER,

POINTER, CLEANER,

CAULKER,

WATERPROOFER
(3RD SHIFT)
08/22/2022 06/30/2023
* $68.040 A $11.100 $13.620 $0.000 B $1.630 $0.430 8.0 C $94.820 $128.840 $128.840 D $162.860 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#BRICKLAYER,
BLOCKLAYER:

BRICKLAYER,

BLOCKLAYER,
STONEMASON (2ND
SHIFT)
08/22/2022 04/30/2023
** $55.970 A $11.100 $11.120 $3.000 E $0.800 $2.170 F 8.0 C $84.160 $113.650 G $113.650 G $143.130 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#BRICKLAYER,
BLOCKLAYER:

BRICKLAYER,

BLOCKLAYER,
STONEMASON (3RD
SHIFT)
08/22/2022 04/30/2023
** $58.650 A $11.100 $11.120 $3.000 E $0.800 $2.170 F 8.0 C $86.840 $117.670 G $117.670 G $148.490 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#BRICK
TENDER

BRICK TENDER
(SPECIAL SINGLE
SHIFT)
08/22/2022 06/30/2023
* $40.930 H $9.600 $12.820 $0.000 B $0.450 $0.300 8.0 $64.100 $84.570 I $84.570 I $105.030 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#CARPET,

LINOLEUM,

SOFT FLOOR LAYER
(SPECIAL SHIFT) 02/22/2023 06/30/2023* $67.630 A $11.050 $20.530 $0.000 J $1.050 $0.340 8.0 $100.600 $168.230 $168.230 $168.230 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#ELECTRICIAN:

COMM & SYSTEM

INSTALLER,

SECOND SHIFT
02/22/2023 10/31/2023
** $60.030 $12.800 $10.000 K $0.000 $1.100 $0.260 L 8.0 $86.290 $117.360 M $117.360 M $148.420 N Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#ELECTRICIAN:

COMM & SYSTEM

INSTALLER, THIRD
SHIFT
02/22/2023 10/31/2023
** $67.250 $12.800 $10.000 K $0.000 $1.100 $0.260 L 8.0 $93.770 $128.570 M $128.570 M $163.380 N Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#ELECTRICIAN:

COMM & SYSTEM
TECH., SECOND
SHIFT
02/22/2023 10/31/2023
** $69.040 $12.800 $10.000 K $0.000 $1.100 $0.260 L 8.0 $95.620 $131.350 M $131.350 M $167.080 N Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#ELECTRICIAN: COMM & SYSTEM
TECH., THIRD SHIFT 02/22/2023 10/31/2023** $77.340 $12.800 $10.000 K $0.000 $1.100 $0.260 L 8.0 $104.210 $144.240 M $144.240 M $184.260 N Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#ELECTRICIAN:

INSIDE WIREMAN,

TECHNICIAN

SECOND SHIFT
O 08/22/2022 05/31/2023** $94.040 P $16.150 $21.900 Q $0.000 $1.500 $0.710 R 8.0 $137.120 $185.550 S $233.980 T $233.980 T Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#ELECTRICIAN:

INSIDE WIREMAN,

TECHNICIAN THIRD
SHIFT
O 08/22/2022 05/31/2023** $105.340 P $16.150 $21.900 Q $0.000 $1.500 $0.770 R 8.0 $148.820 $203.070 S $257.320 T $257.320 T Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#ELECTRICIAN: CABLE SPLICER,
2ND SHIFT O 08/22/2022 05/31/2023** $108.150 P $16.150 $21.900 Q $0.000 $1.500 $0.780 R 8.0 $151.720 $207.420 S $263.120 T $263.120 T Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#ELECTRICIAN: CABLE SPLICER,
3RD SHIFT O 08/22/2022 05/31/2023** $121.150 P $16.150 $21.900 Q $0.000 $1.500 $0.850 R 8.0 $165.180 $227.580 S $289.970 T $289.970 T Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#FIELD
SURVEYOR:

CHIEF OF PARTY
(NIGHT SHIFT) U 02/22/2023 02/29/2024** $62.200 $13.380 $13.510 V $4.960 W $1.260 $0.190 8.0 $95.500 $126.600 X $126.600 X $157.700 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#FIELD
SURVEYOR:

INSTRUMENTMAN
(NIGHT SHIFT) U 02/22/2023 02/29/2024** $57.600 $13.380 $13.510 V $4.960 W $1.260 $0.190 8.0 $90.900 $119.700 X $119.700 X $148.500 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#FIELD
SURVEYOR:

CHAINMAN/RODMAN
(NIGHT SHIFT) U 02/22/2023 02/29/2024** $54.360 $13.380 $13.510 V $4.960 W $1.260 $0.190 8.0 $87.660 $114.840 X $114.840 X $142.020 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#GLAZIER GLAZIER (SPECIAL
SHIFT) Y 02/22/2023 12/31/2023** $61.300 A $11.050 $20.300 Z $0.000 $1.100 $0.480 AA 7.5 AB $94.230 $155.530 $155.530 $155.530 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#MARBLE

FINISHER

MARBLE FINISHER
(2ND SHIFT) AC 08/22/2022 07/31/2023** $44.200 AD $11.100 $6.180 $0.000 J $0.450 $0.910 8.0 $62.840 $84.940 AE $107.040 $107.040 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#MARBLE
MASON

MARBLE MASON
(2ND SHIFT) AC 08/22/2022 07/31/2023** $62.980 AD $11.100 $15.780 $0.000 J $0.800 $1.250 8.0 $91.910 $123.400 AE $154.890 $154.890 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PAINTER PAINTER (SPECIAL
SHIFT) AF 02/22/2023 06/30/2023* $54.480 H $11.050 $15.220 V $0.000 J $1.010 $0.380 8.0 C $82.140 $109.380 AG $109.380 AG $136.620 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PAINTER

INDUSTRIAL

PAINTER (SPECIAL
SHIFT)
AH 02/22/2023 06/30/2023* $56.780 H $11.050 $15.220 V $0.000 J $1.010 $0.380 8.0 C $84.440 $112.830 AG $112.830 AG $141.220 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PAINTER BRIDGE PAINTER
(SPECIAL SHIFT) AI 02/22/2023 06/30/2023* $59.080 H $11.050 $15.220 V $0.000 J $1.010 $0.380 8.0 C $86.740 $116.280 AG $116.280 AG $145.820 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PAINTER: TAPER (SPECIAL
SHIFT) 02/22/2023 06/30/2023** $68.540 AJ $11.050 $18.140 $0.000 J $1.050 $0.680 8.0 $99.460 $133.730 AK $133.730 AK $168.000 AL Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PLASTERER PLASTERER: 2ND
SHIFT 08/22/2022 06/30/2023** $48.540 AM $14.430 $18.490 $0.000 B $1.290 $1.340 7.0 AN $84.090 $105.260 AO $105.260 AP $126.420 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PLASTERER PLASTERER: 3RD
SHIFT 08/22/2022 06/30/2023** $49.540 AM $14.430 $18.490 $0.000 B $1.290 $1.340 7.0 AN $85.090 $106.760 AO $106.760 AP $128.420 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PLUMBER:

PLUMBER,

STEAMFITTER,

REFRIGERATION
FITTER (HVAC)(2ND
SHIFT)
02/22/2023 06/30/2023
** $81.630 A $17.460 AQ $28.470 AR $0.000 B $1.950 $0.950 AS 7.5 AT $130.460 $177.030 G $177.030 G $223.590 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PLUMBER:

PLUMBER,

STEAMFITTER,

REFRIGERATION
FITTER (HVAC)(3RD
SHIFT)
02/22/2023 06/30/2023
** $81.630 A $17.460 AQ $28.470 AR $0.000 B $1.950 $0.950 AS 7.0 AU $130.460 $177.030 G $177.030 G $223.590 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
2)(2ND SHIFT)
02/22/2023 06/30/2023
* $29.300 A $10.700 AV $0.500 AV $0.000 B $0.000 $0.250 AW 7.5 AT $40.750 $55.400 G $55.400 G $70.050 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
2)(3RD SHIFT)
02/22/2023 06/30/2023
* $29.300 A $10.700 AV $0.500 AV $0.000 B $0.000 $0.250 AW 7.0 AU $40.750 $55.400 G $55.400 G $70.050 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
3)(2ND SHIFT)
02/22/2023 06/30/2023
* $35.740 A $10.700 AV $0.500 AV $0.000 B $0.000 $0.250 AW 7.5 AT $47.190 $65.060 G $65.060 G $82.930 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
3)(3RD SHIFT)
02/22/2023 06/30/2023
* $35.740 A $10.700 AV $0.500 AV $0.000 B $0.000 $0.250 AW 7.0 AU $47.190 $65.060 G $65.060 G $82.930 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
4)(2ND SHIFT)
02/22/2023 06/30/2023
* $37.330 A $10.700 AV $0.500 AV $0.000 B $0.000 $0.250 AW 7.5 AT $48.780 $67.450 G $67.450 G $86.110 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
4)(3RD SHIFT)
02/22/2023 06/30/2023
* $37.330 A $10.700 AV $0.500 AV $0.000 B $0.000 $0.250 AW 7.0 AU $48.780 $67.450 G $67.450 G $86.110 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions

15.b
Packet Pg. 650
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

CRAFT CLASSIFICATION CRAFT

FOOTNOTE
ISSUE
DATE

EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE

FOOTNOTE
HEALTH
AND

WELFARE
HEALTH
AND

WELFARE

FOOTNOTE

PENSION PENSION

FOOTNOTE

VACATION/

HOLIDAY

VACATION/

HOLIDAY

FOOTNOTE

TRAINING TRAINING

FOOTNOTE
OTHER

PAYMENTS
OTHER

PAYMENTS

FOOTNOTE

HOURS HOURS

FOOTNOTE

STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE

FOOTNOTE

SATURDAY

OVERTIME
HOURLY
RATE

SATURDAY

OVERTIME
HOURLY
RATE

FOOTNOTE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE

FOOTNOTE

HOLIDAY

PROVISIONS

SCOPE OF
WORK

PROVISIONS

TRAVEL &

SUBSISTENCE

PROVISIONS
SHIFT

PROVISIONS
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
5)(2ND SHIFT)
02/22/2023 06/30/2023
* $40.770 A $10.700 AV $2.250 AV $0.000 B $0.000 $0.250 AW 7.5 AT $53.970 $74.360 G $74.360 G $94.740 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
5)(3RD SHIFT)
02/22/2023 06/30/2023
* $40.770 A $10.700 AV $2.250 AV $0.000 B $0.000 $0.250 AW 7.0 AU $53.970 $74.360 G $74.360 G $94.740 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PLUMBER: SERVICE AND
REPAIR (2ND SHIFT) 02/22/2023 06/30/2023** $81.630 A $17.460 AQ $28.470 AR $0.000 B $1.950 $0.950 AS 7.5 AT $130.460 $177.030 G $177.030 G $223.590 AX Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#PLUMBER: SERVICE AND
REPAIR (3RD SHIFT) 02/22/2023 06/30/2023** $81.630 A $17.460 AQ $28.470 AR $0.000 B $1.950 $0.950 AS 7.0 AU $130.460 $177.030 G $177.030 G $223.590 AX Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

SHEET METAL

WORKER (SPECIAL
SHIFT)
08/22/2022 07/02/2023
** $77.360 H $15.020 AY $32.290 AZ $0.000 B $1.650 $0.710 8.0 $127.030 $169.550 BA $169.550 BA $212.060 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

SHEET METAL
WORKER (2ND
SHIFT)
08/22/2022 07/02/2023
** $75.980 H $15.020 AY $32.290 AZ $0.000 B $1.650 $0.710 7.5 AT $125.650 $167.480 BA $167.480 BA $209.300 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

SHEET METAL
WORKER (3RD
SHIFT)
08/22/2022 07/02/2023
** $79.430 H $15.020 AY $32.290 AZ $0.000 B $1.650 $0.710 7.0 AU $129.100 $172.650 BA $172.650 BA $216.200 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

TOTAL SHEET

METAL CONTRACT
OF $200,000 OR

LESS (SPECIAL
SHIFT)
08/22/2022 07/02/2023
** $67.130 H $15.020 AY $30.590 AZ $0.000 B $1.650 $0.710 8.0 $115.100 $152.000 BA $152.000 BA $188.890 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

TOTAL SHEET

METAL CONTRACT
OF $200,000 OR
LESS (2ND SHIFT)
08/22/2022 07/02/2023
** $65.930 H $15.020 AY $30.590 AZ $0.000 B $1.650 $0.710 7.5 AT $113.900 $150.200 BA $150.200 BA $186.490 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

TOTAL SHEET

METAL CONTRACT
OF $200,000 OR
LESS (3RD SHIFT)
08/22/2022 07/02/2023
** $68.930 H $15.020 AY $30.590 AZ $0.000 B $1.650 $0.710 7.0 AU $116.900 $154.700 BA $154.700 BA $192.490 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

SERVICE MECHANIC
(TOTAL SHEET

METAL CONTRACT
OF $200,000 OR

LESS) (SPECIAL
SHIFT)
08/22/2022 07/02/2023
** $52.920 H $14.420 BB $16.660 AZ $0.000 B $1.490 $0.710 8.0 $86.200 $113.920 BC $113.920 BC $141.620 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

SERVICE MECHANIC
(TOTAL SHEET

METAL CONTRACT
OF $200,000 OR
LESS) (2ND SHIFT)
08/22/2022 07/02/2023
** $51.980 H $14.420 BB $16.660 AZ $0.000 B $1.490 $0.710 7.5 AT $85.260 $112.510 BC $112.510 BC $139.740 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

SERVICE MECHANIC
(TOTAL SHEET

METAL CONTRACT
OF $200,000 OR
LESS) (3RD SHIFT)
08/22/2022 07/02/2023
** $54.340 H $14.420 BB $16.660 AZ $0.000 B $1.490 $0.710 7.0 AU $87.620 $116.050 BC $116.050 BC $144.460 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

SERVICE

TECHNICIAN (TOTAL

SHEET METAL

CONTRACT OF
$200,000 OR LESS)
(SPECIAL SHIFT)
08/22/2022 07/02/2023
** $48.080 H $14.420 BB $10.950 AZ $0.000 B $1.490 $0.710 8.0 $75.650 $100.500 BC $100.500 BC $125.330 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

SERVICE

TECHNICIAN (TOTAL

SHEET METAL

CONTRACT OF
$200,000 OR LESS)
(2ND SHIFT)
08/22/2022 07/02/2023
** $47.220 H $14.420 BB $10.950 AZ $0.000 B $1.490 $0.710 7.5 AT $74.790 $99.210 BC $99.210 BC $123.610 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

SERVICE

TECHNICIAN (TOTAL

SHEET METAL

CONTRACT OF
$200,000 OR LESS)
(3RD SHIFT)
08/22/2022 07/02/2023
** $49.370 H $14.420 BB $10.950 AZ $0.000 B $1.490 $0.710 7.0 AU $76.940 $102.430 BC $102.430 BC $127.910 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

AIR CONDITIONING

SPECIALIST (TOTAL

SHEET METAL

CONTRACT OF
$200,000 OR LESS)
(SPECIAL SHIFT)
08/22/2022 07/02/2023
** $42.100 H $14.420 BB $5.310 AZ $0.000 B $1.470 $0.710 8.0 $64.010 $85.650 BA $85.650 BA $107.270 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

AIR CONDITIONING

SPECIALIST (TOTAL

SHEET METAL

CONTRACT OF
$200,000 OR LESS)
(2ND SHIFT)
08/22/2022 07/02/2023
** $41.350 H $14.420 BB $5.310 AZ $0.000 B $1.470 $0.710 7.5 AT $63.260 $84.520 BA $84.520 BA $105.770 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

AIR CONDITIONING

SPECIALIST (TOTAL

SHEET METAL

CONTRACT OF
$200,000 OR LESS)
(3RD SHIFT)
08/22/2022 07/02/2023
** $43.230 H $14.420 BB $5.310 AZ $0.000 B $1.470 $0.710 7.0 AU $65.140 $87.340 BA $87.340 BA $109.530 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

AIR CONDITIONING

PRO (TOTAL SHEET

METAL CONTRACT
OF $200,000 OR

LESS) (SPECIAL
SHIFT)
08/22/2022 07/02/2023
** $49.380 H $14.420 AY $11.310 AZ $0.000 B $1.470 $0.710 8.0 $77.290 $102.740 BA $102.740 BA $128.170 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

AIR CONDITIONING

PRO (TOTAL SHEET

METAL CONTRACT
OF $200,000 OR
LESS) (2ND SHIFT)
08/22/2022 07/02/2023
** $48.500 H $14.420 AY $11.310 AZ $0.000 B $1.470 $0.710 7.5 AT $76.410 $101.420 BA $101.420 BA $126.410 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#SHEET METAL
WORKER

AIR CONDITIONING

PRO (TOTAL SHEET

METAL CONTRACT
OF $200,000 OR
LESS) (3RD SHIFT)
08/22/2022 07/02/2023
** $50.700 H $14.420 AY $11.310 AZ $0.000 B $1.470 $0.710 7.0 AU $78.610 $104.720 BA $104.720 BA $130.810 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#TERRAZZO

FINISHER

TERRAZZO
FINISHER, 2ND
SHIFT
BD 08/22/2022 06/30/2023** $46.930 BE $11.100 $6.470 $0.000 B $0.800 $1.040 8.0 $66.340 $87.400 BA $87.400 BA $108.450 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#TERRAZZO

FINISHER

TERRAZZO
FINISHER, 3RD
SHIFT
BD 08/22/2022 06/30/2023** $46.930 BE $11.100 $6.470 $0.000 B $0.800 $1.040 8.0 $66.340 $87.400 BA $87.400 BA $108.450 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions

15.b
Packet Pg. 651
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library *
**
#
&
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
AI
AJ
AK
AL
AM
AN
AO
AP

CRAFT CLASSIFICATION CRAFT

FOOTNOTE
ISSUE
DATE

EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE

FOOTNOTE
HEALTH
AND

WELFARE
HEALTH
AND

WELFARE

FOOTNOTE

PENSION PENSION

FOOTNOTE

VACATION/

HOLIDAY

VACATION/

HOLIDAY

FOOTNOTE

TRAINING TRAINING

FOOTNOTE
OTHER

PAYMENTS
OTHER

PAYMENTS

FOOTNOTE

HOURS HOURS

FOOTNOTE

STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE

FOOTNOTE

SATURDAY

OVERTIME
HOURLY
RATE

SATURDAY

OVERTIME
HOURLY
RATE

FOOTNOTE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE

FOOTNOTE

HOLIDAY

PROVISIONS

SCOPE OF
WORK

PROVISIONS

TRAVEL &

SUBSISTENCE

PROVISIONS
SHIFT

PROVISIONS
#TERRAZZO
WORKER

TERRAZZO
WORKER, 2ND
SHIFT
BD 08/22/2022 06/30/2023** $64.840 BE $11.100 $14.780 $0.000 B $0.800 $1.280 8.0 $92.800 $122.040 BA $122.040 BA $151.280 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#TERRAZZO
WORKER

TERRAZZO
WORKER, 3RD
SHIFT
BD 08/22/2022 06/30/2023** $64.840 BE $11.100 $14.780 $0.000 B $0.800 $1.280 8.0 $92.800 $122.040 BA $122.040 BA $151.280 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#TILE

FINISHER
TILE FINISHER, 2ND
SHIFT 02/22/2023 03/31/2023** $37.860 BF $10.960 $5.550 $1.000 $0.490 $1.020 8.0 C $56.880 $73.310 $73.310 BG $89.740 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#TILE

FINISHER

TILE FINISHER - RED

CIRCLED FINISHER,
2ND SHIFT
02/22/2023 03/31/2023
** $43.130 BF $10.960 $6.330 $1.500 $0.490 $1.150 8.0 C $63.560 $82.630 $82.630 BG $101.690 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
#TILE SETTER TILE SETTER, 2ND
SHIFT 02/22/2023 03/31/2023** $58.910 BF $10.960 $8.050 $2.500 $0.700 $1.690 8.0 C $82.810 $109.270 $109.270 BG $135.720 Holidays Scope of Work
Travel &
Subsistence
Shift
Provisions
Go to increase page

FOOTNOTES
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.

THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.

INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.

THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.

INCLUDED IN STRAIGHT-TIME HOURLY RATE.

SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.

VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY COUNCIL.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.

RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.

INCLUDED IN BASIC HOURLY RATE.

IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.

IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.

RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.

FOR SHIFT RATES ON OCCUPIED REMODEL AND RENOVATION WORK, PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415)703-4774.

INCLUDES AMOUNT WITHHELD FOR WORKING DUES.

IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES AMOUNT EQUAL TO 0.5% OF THE HOURLY RATE FOR THE ADMINISTRATIVE MAINTENANCE FUND AND THE REMAINING AMOUNT IS FOR THE JOINT ELECTRICAL INDUSTRY FUND.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS UP TO A MAXIMUM OF 10 HOURS IN ANY ONE WEEK. ALL OTHER TIME INCLUDING ALL WORK ON SATURDAYS, SUNDAYS, and HOLIDAYS IS PAID AT THE DOUBLE TIME RATE.

DISREGARD THIS RATE. FOR ALL WORK ON SATURDAYS, SUNDAYS, AND HOLIDAYS, USE THE SATURDAY, SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.

ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.

INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.

INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.

RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED, SUNDAY NIGHT THROUGH THURSDAY NIGHT, OR OTHER OVERTIME HOURS BEYOND 40 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY SHIFT DIFFERENTIAL RATE. IN THE EVENT THAT THERE ARE LESS THAN 40 HOURS WORKED SUNDAY THROUGH THURSDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 40 HOURS FOR THE WORKWEEK, OR UP TO 8 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME SHIFT DIFFERENTIAL RATE.

CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.

INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE 8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.

INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.

RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.

INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME.EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE
8 HOURS PAY FOR 7 HOURS WORKED AT STRAIGHT-TIME BASIC HOURLY RATE.

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

15.b
Packet Pg. 652
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library AQ
AR
AS
AT
AU
AV
AW
AX
AY
AZ
BA
BB
BC
BD
BE
BF
BG
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 7 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL

WORKWEEK DUE TO INCLEMENT WEATHER
INCLUDES AN AMOUNT FOR HEALTH AND WELFARE EXTENDED RESERVE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES AN AMOUNT FOR 401A-PART B PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES AN AMOUNT FOR SUPPLEMENTAL UNEMPLOYMENT BENEFITS. 8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7.5 HOURS WORKED 8 HOURS PAY AT THE STRAIGHT TIME TOTAL HOURLY RATE FOR 7 HOURS WORKED PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

AMOUNT IS FOR CONTRACT ADMINISTRATION
RATE APPLIES TO PLUMBING SERVICE AND REPAIR HOLIDAYS. FOR HOLIDAY RATE APPLICABLE TO HVAC REFRIGERATION SERVICE, PLEASE SEE HOLIDAY PROVISIONS.

INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.

THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).

INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.

INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. INCLUDES AN AMOUNT OF PREMIUM RATE PER HOUR ABOVE THE REGULAR STRAIGHT-TIME RATE, WHICH IS NOT FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.

RATE APPLIES TO THE FIRST 9 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page

15.b
Packet Pg. 653
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS LOCALITY: SANTA CLARA COUNTY
DETERMINATION: STC-2023-1

CRAFT CLASSIFICATION CRAFT

FOOTNOTE
ISSUE
DATE

EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE

FOOTNOTE
HEALTH
AND

WELFARE
HEALTH
AND

WELFARE

FOOTNOTE

PENSION PENSION

FOOTNOTE

VACATION/

HOLIDAY

VACATION/

HOLIDAY

FOOTNOTE

TRAINING TRAINING

FOOTNOTE
OTHER

PAYMENTS
OTHER

PAYMENTS

FOOTNOTE

HOURS HOURS

FOOTNOTE

STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE

FOOTNOTE

SATURDAY

OVERTIME
HOURLY
RATE

SATURDAY

OVERTIME
HOURLY
RATE

FOOTNOTE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE

FOOTNOTE

HOLIDAY

PROVISIONS

SCOPE OF
WORK

PROVISIONS

TRAVEL &

SUBSISTENCE

PROVISIONS
#BRICKLAYER,
BLOCKLAYER:

BRICKLAYER,

BLOCKLAYER,

STONEMASON
08/22/2022 04/30/2023
** $50.610 A $11.100 $11.120 $3.000 B $0.800 $2.170 C 8.0 D $78.800 $104.120 E $104.110 E $129.410 Holidays Scope of Work
Travel &
Subsistence
#BRICKLAYER,
BLOCKLAYER:

POINTER, CLEANER,

CAULKER,

WATERPROOFER
08/22/2022 06/30/2023
* $56.700 A $11.100 $13.620 $0.000 F $1.630 $0.430 8.0 D $83.480 $111.830 $111.830 G $140.180 Holidays Scope of Work
Travel &
Subsistence
#BRICK
TENDER 08/22/2022 06/30/2023* $37.930 H $9.600 $12.820 $0.000 F $0.450 $0.300 8.0 $61.100 $80.070 I $80.070 I $99.030 Holidays Scope of Work
Travel &
Subsistence
#CARPET,
LINOLEUM, SOFT FLOOR LAYER 02/22/2023 06/30/2023* $56.350 A $11.050 $20.530 $0.000 J $1.050 $0.340 8.0 $89.320 $117.500 K $117.500 K $145.670 Holidays Scope of Work
Travel &
Subsistence

CARPET,

LINOLEUM,

FLOOR COVERING
HANDLER AFTER 3
YEARS
02/22/2023 06/30/2023
* $28.150 A $11.050 $10.270 $0.000 J $0.050 $0.340 8.0 $49.860 $63.940 K $63.940 K $78.010 Holidays Scope of Work
Travel &
Subsistence

CARPET,

LINOLEUM,

FLOOR COVERING

HANDLER LESS
THAN 3 YEARS
02/22/2023 06/30/2023
* $22.510 A $11.050 $8.210 $0.000 J $0.050 $0.340 8.0 $42.160 $53.420 K $53.420 K $64.670 Holidays Scope of Work
Travel &
Subsistence

CARPET,

LINOLEUM,

FLOOR COVERING

HANDLER TRAINEE,
FIRST 3 MONTHS
02/22/2023 06/30/2023
* $18.000 A $11.050 $6.570 $0.000 J $0.050 $0.340 8.0 $36.010 $45.010 K $45.010 K $54.010 Holidays Scope of Work
Travel &
Subsistence

CARPET,

LINOLEUM,

FLOOR COVERING

HANDLER TRAINEE,
SECOND 3 MONTHS
02/22/2023 06/30/2023
* $20.250 A $11.050 $7.390 $0.000 J $0.050 $0.340 8.0 $39.080 $49.210 K $49.210 K $59.330 Holidays Scope of Work
Travel &
Subsistence
#ELECTRICIAN: COMM & SYSTEM
INSTALLER 02/22/2023 10/31/2023** $51.180 $12.800 $10.000 L $0.000 $1.100 $0.260 M 8.0 $77.140 $103.620 N $103.620 N $130.110 Holidays Scope of Work
Travel &
Subsistence
#ELECTRICIAN: COMM & SYSTEM
TECH. 02/22/2023 10/31/2023** $58.860 $12.800 $10.000 L $0.000 $1.100 $0.260 M 8.0 $85.080 $115.530 N $115.530 N $145.990 Holidays Scope of Work
Travel &
Subsistence
#ELECTRICIAN: INSIDE WIREMAN,
TECHNICIAN 08/22/2022 05/31/2023** $80.170 O $16.150 $21.900 P $0.000 $1.500 $0.640 Q 8.0 $122.770 $164.050 R $205.340 $205.340 Holidays Scope of Work
Travel &
Subsistence
#ELECTRICIAN: CABLE SPLICER 08/22/2022 05/31/2023** $92.200 O $16.150 $21.900 P $0.000 $1.500 $0.700 Q 8.0 $135.220 $182.700 R $230.180 $230.180 Holidays Scope of Work
Travel &
Subsistence
ELECTRICIAN: MATERIAL HANDLER S 02/22/2023 07/31/2023* $38.270 $11.950 $4.050 L $0.000 $0.000 $0.300 8.0 $55.720 $75.430 $75.430 $95.140 Holidays Scope of Work
Travel &
Subsistence
ELECTRICIAN:

MATERIAL HANDLER
- FOURTH SIX
MONTHS
S 02/22/2023 07/31/2023* $32.530 $11.950 $4.050 L $0.000 $0.000 $0.270 8.0 $49.780 $66.530 $66.530 $83.280 Holidays Scope of Work
Travel &
Subsistence
ELECTRICIAN:

MATERIAL HANDLER
- THIRD SIX
MONTHS
S 02/22/2023 07/31/2022* $28.700 $11.950 $4.050 L $0.000 $0.000 $0.250 8.0 $45.810 $60.590 $60.590 $75.370 Holidays Scope of Work
Travel &
Subsistence
ELECTRICIAN:

MATERIAL HANDLER
- SECOND SIX
MONTHS
S 02/22/2023 07/31/2023* $24.880 $11.950 $4.050 L $0.000 $0.000 $0.230 8.0 $41.860 $54.670 $54.670 $67.480 Holidays Scope of Work
Travel &
Subsistence
ELECTRICIAN: MATERIAL HANDLER
- FIRST SIX MONTHS S 02/22/2023 07/31/2023* $22.960 $0.000 $0.000 L $0.000 $0.000 $0.220 8.0 $23.870 $35.690 $35.690 $47.520 Holidays Scope of Work
Travel &
Subsistence
#FIELD
SURVEYOR: CHIEF OF PARTY T 02/22/2023 02/29/2024** $55.290 $13.380 $13.510 U $4.960 V $1.260 $0.190 8.0 $88.590 $116.240 W $116.240 W $143.880 Holidays Scope of Work
Travel &
Subsistence
#FIELD
SURVEYOR: INSTRUMENTMAN T 02/22/2023 02/29/2024** $51.200 $13.380 $13.510 U $4.960 V $1.260 $0.190 8.0 $84.500 $110.100 W $110.100 W $135.700 Holidays Scope of Work
Travel &
Subsistence
#FIELD
SURVEYOR: CHAINMAN/RODMAN T 02/22/2023 02/29/2024** $48.320 $13.380 $13.510 U $4.960 V $1.260 $0.190 8.0 $81.620 $105.780 W $105.780 W $129.940 Holidays Scope of Work
Travel &
Subsistence
#GLAZIER X 02/22/2023 12/31/2023** $55.720 A $11.050 $20.300 Y $0.000 $1.100 $0.480 Z 8.0 $88.650 $116.510 AA $144.370 $144.370 Holidays Scope of Work
Travel &
Subsistence
#MARBLE
FINISHER AB 08/22/2022 07/31/2023** $39.200 AC $11.100 $6.180 $0.000 J $0.450 $0.910 8.0 $57.840 $77.440 AD $97.040 $97.040 Holidays Scope of Work
Travel &
Subsistence
#MARBLE
MASON AB 08/22/2022 07/31/2023** $56.980 AC $11.100 $15.780 $0.000 J $0.800 $1.250 8.0 $85.910 $114.400 AD $142.890 $142.890 Holidays Scope of Work
Travel &
Subsistence
#PAINTER AE 02/22/2023 06/30/2023* $47.370 H $11.050 $15.220 U $0.000 J $1.010 $0.380 8.0 D $75.030 $98.720 AF $98.720 AF $122.400 Holidays Scope of Work
Travel &
Subsistence
#PAINTER INDUSTRIAL
PAINTER AG 02/22/2023 06/30/2023* $49.370 H $11.050 $15.220 U $0.000 J $1.010 $0.380 8.0 D $77.030 $101.720 AF $101.720 AF $126.400 Holidays Scope of Work
Travel &
Subsistence
#PAINTER BRIDGE PAINTER AH 02/22/2023 06/30/2023* $51.370 H $11.050 $15.220 U $0.000 J $1.010 $0.380 8.0 D $79.030 $104.720 AF $104.720 AF $130.400 Holidays Scope of Work
Travel &
Subsistence
#PAINTER: TAPER 02/22/2023 06/30/2023** $57.110 AI $11.050 $18.140 $0.000 J $1.050 $0.680 8.0 $88.030 $116.590 AJ $116.590 AJ $145.140 AK Holidays Scope of Work
Travel &
Subsistence
#PLASTERER 08/22/2022 06/30/2023** $47.540 AL $14.430 $18.490 $0.000 F $1.290 $1.340 8.0 $83.090 $103.760 AM $103.760 AN $124.420 Holidays Scope of Work
Travel &
Subsistence
#PLASTER
TENDER 02/22/2023 06/30/2023** $39.230 $9.600 $14.680 $4.810 $0.500 $0.450 8.0 $69.270 $88.890 K $88.890 K $108.500 Holidays Scope of Work
Travel &
Subsistence
#PLUMBER: UNDERGROUND
UTILITY PIPEFITTER 08/22/2022 06/30/2023** $32.220 $12.150 $3.000 AO $2.000 $0.400 $0.800 8.0 $50.570 $66.680 $66.680 D $82.790 Holidays Scope of Work
Travel &
Subsistence
#PLUMBER: LANDSCAPE
PIPEFITTER 08/22/2022 06/30/2023** $32.220 $12.150 $3.000 AO $2.000 $0.400 $0.800 8.0 $50.570 $66.680 $66.680 D $82.790 Holidays Scope of Work
Travel &
Subsistence
PLUMBER:

UNDERGROUND

UTILITY ASSISTANT

JOURNEYMAN
AP 08/22/2022 06/30/2023** $19.220 $12.150 $3.000 AO $2.000 $0.400 $0.800 8.0 $37.570 $47.180 $47.180 D $56.790 Holidays Scope of Work
Travel &
Subsistence
PLUMBER:

LANDSCAPE

ASSISTANT

JOURNEYMAN
AQ 08/22/2022 06/30/2023** $19.220 $12.150 $3.000 AO $2.000 $0.400 $0.800 8.0 $37.570 $47.180 $47.180 D $56.790 Holidays Scope of Work
Travel &
Subsistence
PLUMBER:

UNDERGROUND

UTILITY

TRADESMAN
AR 08/22/2022 06/30/2023** $16.000 $12.150 $3.000 AO $2.000 $0.400 $0.800 8.0 $34.350 $42.350 $42.350 D $50.350 Holidays Scope of Work
Travel &
Subsistence
PLUMBER: LANDSCAPE
TRADESMAN I AS 08/22/2022 06/30/2023** $16.000 $12.150 $0.000 AO $2.000 $0.400 $0.800 8.0 $31.350 $39.350 $39.350 D $47.350 Holidays Scope of Work
Travel &
Subsistence
PLUMBER: LANDSCAPE
TRADESMAN II AS 08/22/2022 06/30/2023** $16.000 $12.150 $3.000 AO $2.000 $0.400 $0.800 8.0 $34.350 $42.350 $42.350 D $50.350 Holidays Scope of Work
Travel &
Subsistence
#PLUMBER:

PLUMBER,

STEAMFITTER,

REFRIGERATION

FITTER (HVAC)
02/22/2023 06/30/2023
** $70.980 A $17.460 AT $28.470 AU $0.000 F $1.950 $0.950 AV 8.0 $119.810 $161.060 E $161.060 E $202.290 Holidays Scope of Work
Travel &
Subsistence
PLUMBER: CONSTRUCTION

TRADESMAN (YEAR
02/22/2023 06/30/2023* $25.480 A $10.700 AO $0.500 AO $0.000 F $0.000 $0.250 AW 8.0 $36.930 $49.670 E $49.670 E $62.410 Holidays Scope of Work
Travel &
Subsistence

15.b
Packet Pg. 654
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library *
**
#
&
A
B
C
D
E
F
G
H
I
J

CRAFT CLASSIFICATION CRAFT

FOOTNOTE
ISSUE
DATE

EXPIRATION
DATE
BASIC
HOURLY
RATE
BASIC
HOURLY
RATE

FOOTNOTE
HEALTH
AND

WELFARE
HEALTH
AND

WELFARE

FOOTNOTE

PENSION PENSION

FOOTNOTE

VACATION/

HOLIDAY

VACATION/

HOLIDAY

FOOTNOTE

TRAINING TRAINING

FOOTNOTE
OTHER

PAYMENTS
OTHER

PAYMENTS

FOOTNOTE

HOURS HOURS

FOOTNOTE

STRAIGHT-
TIME
TOTAL
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE
DAILY

OVERTIME
HOURLY
RATE

FOOTNOTE

SATURDAY

OVERTIME
HOURLY
RATE

SATURDAY

OVERTIME
HOURLY
RATE

FOOTNOTE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE
SUNDAY
AND

HOLIDAY

OVERTIME
HOURLY
RATE

FOOTNOTE

HOLIDAY

PROVISIONS

SCOPE OF
WORK

PROVISIONS

TRAVEL &

SUBSISTENCE

PROVISIONS
2)
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
3)
02/22/2023 06/30/2023
* $31.080 A $10.700 AO $0.500 AO $0.000 F $0.000 $0.250 AW 8.0 $42.530 $58.080 E $58.080 E $73.610 Holidays Scope of Work
Travel &
Subsistence
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
4)
02/22/2023 06/30/2023
* $32.460 A $10.700 AO $0.500 AO $0.000 F $0.000 $0.250 AW 8.0 $43.910 $60.140 E $60.140 E $76.370 Holidays Scope of Work
Travel &
Subsistence
PLUMBER:

CONSTRUCTION

TRADESMAN (YEAR
5)
02/22/2023 06/30/2023
* $35.450 A $10.700 AO $2.250 AO $0.000 F $0.000 $0.250 AW 8.0 $48.650 $66.380 E $66.380 E $84.100 Holidays Scope of Work
Travel &
Subsistence
#PLUMBER: SERVICE AND
REPAIR 02/22/2023 06/30/2023** $70.980 A $17.460 AT $28.470 AU $0.000 F $1.950 $0.950 AV 8.0 $119.810 $161.060 E $161.060 E $202.290 AX Holidays Scope of Work
Travel &
Subsistence
#PLUMBER:

SPRINKLER FITTER
(FIRE PROTECTION

AND FIRE CONTROL

SYSTEMS)
02/22/2023 07/30/2023
** $72.590 A $12.900 $22.200 $0.000 F $1.850 $0.300 8.0 $109.840 $146.140 E $146.140 E $182.430 Holidays Scope of Work
Travel &
Subsistence
#ROOFER ROOFER,
KETTLEMAN 08/22/2022 07/31/2023** $47.540 AY $10.710 $9.060 $3.620 $1.050 $0.440 8.0 $72.420 $95.350 AZ $95.350 BA $118.270 Holidays Scope of Work
Travel &
Subsistence
#ROOFER HELPER 08/22/2022 07/31/2023** $42.960 AY $10.710 $9.060 $3.620 $1.050 $0.440 8.0 $67.840 $88.480 AZ $88.480 BA $109.110 Holidays Scope of Work
Travel &
Subsistence
#ROOFER KETTLEMAN (2
KETTLES) 08/22/2022 07/31/2023** $49.540 AY $10.710 $9.060 $3.620 $1.050 $0.440 8.0 $74.420 $98.350 AZ $98.350 BA $122.270 Holidays Scope of Work
Travel &
Subsistence
#ROOFER

BITUMASTIC,

ENAMELER, COAL

TAR, PITCH AND

MASTIC WORKER
08/22/2022 07/31/2023
** $51.540 AY $10.710 $9.060 $3.620 $1.050 $0.440 8.0 $76.420 $101.350 AZ $101.350 BA $126.270 Holidays Scope of Work
Travel &
Subsistence
#SHEET METAL
WORKER 08/22/2022 07/02/2023** $69.070 H $15.020 BB $32.290 BC $0.000 F $1.650 $0.710 8.0 $118.740 $157.110 BD $157.110 BD $195.480 Holidays Scope of Work
Travel &
Subsistence
#SHEET METAL
WORKER

TOTAL SHEET

METAL CONTRACT
OF $200,000 OR
LESS
08/22/2022 07/02/2023
** $59.940 H $15.020 BB $30.590 BC $0.000 F $1.650 $0.710 8.0 $107.910 $141.210 BD $141.210 BD $174.510 Holidays Scope of Work
Travel &
Subsistence
#SHEET METAL
WORKER

SERVICE MECHANIC
(TOTAL SHEET

METAL CONTRACT
OF $200,000 OR
LESS)
08/22/2022 07/02/2023
** $47.250 H $14.420 BE $16.660 BC $0.000 F $1.490 $0.710 8.0 $80.530 $105.410 BF $105.410 BF $130.280 Holidays Scope of Work
Travel &
Subsistence
#SHEET METAL
WORKER

SERVICE

TECHNICIAN (TOTAL

SHEET METAL

CONTRACT OF
$200,000 OR LESS)
08/22/2022 07/02/2023
** $42.930 H $14.420 BE $10.950 BC $0.000 F $1.490 $0.710 8.0 $70.500 $92.770 BF $92.770 BF $115.030 Holidays Scope of Work
Travel &
Subsistence
#SHEET METAL
WORKER

AIR CONDITIONING

SPECIALIST (TOTAL

SHEET METAL

CONTRACT OF
$200,000 OR LESS)
08/22/2022 07/02/2023
** $37.590 H $14.420 BE $5.310 BC $0.000 F $1.470 $0.710 8.0 $59.500 $78.880 BD $78.880 BD $98.250 Holidays Scope of Work
Travel &
Subsistence
#SHEET METAL
WORKER

AIR CONDITIONING

PRO (TOTAL SHEET

METAL CONTRACT
OF $200,000 OR
LESS)
08/22/2022 07/02/2023
** $44.090 H $14.420 BB $11.310 BC $0.000 F $1.470 $0.710 8.0 $72.000 $94.800 BD $94.800 BD $117.590 Holidays Scope of Work
Travel &
Subsistence
#SHEET METAL
WORKER

METAL DECK &
SIDING 02/22/2023 06/30/2023* $47.920 H $15.000 AO $21.960 BG $0.000 F $0.320 BH $0.000 8.0 $85.200 $110.160 BD $110.160 BD $135.120 Holidays Scope of Work
Travel &
Subsistence
#TERRAZZO
FINISHER BI 08/22/2022 06/30/2023** $41.930 BJ $11.100 $6.470 $0.000 F $0.800 $1.040 8.0 $61.340 $79.900 BD $79.900 BD $98.450 Holidays Scope of Work
Travel &
Subsistence
#TERRAZZO
WORKER BI 08/22/2022 06/30/2023** $56.840 BJ $11.100 $14.780 $0.000 F $0.800 $1.280 8.0 $84.800 $110.040 BD $110.040 BD $135.280 Holidays Scope of Work
Travel &
Subsistence
#TILE
FINISHER 02/22/2023 03/31/2023** $32.860 BK $10.960 $5.550 $1.000 $0.490 $1.020 8.0 D $51.880 $68.310 $68.310 BL $84.740 Holidays Scope of Work
Travel &
Subsistence
#TILE

FINISHER

RED CIRCLED
FINISHER 02/22/2023 03/31/2023** $38.130 BK $10.960 $6.330 $1.500 $0.490 $1.150 8.0 D $58.560 $77.630 $77.630 BL $96.690 Holidays Scope of Work
Travel &
Subsistence
#TILE SETTER 02/22/2023 03/31/2023** $52.910 BK $10.960 $8.050 $2.500 $0.700 $1.690 8.0 D $76.810 $103.270 $103.270 BL $129.720 Holidays Scope of Work
Travel &
Subsistence

WATER WELL
DRILLER: 02/22/2023 03/31/2023* $15.500 $3.200 $0.780 $0.630 BM $0.000 $0.000 8.0 $20.110 $27.860 BN $27.860 BN $27.860 BN Holidays Scope of Work
Travel &
Subsistence

WATER WELL
DRILLER: PUMP INSTALLER 02/22/2023 03/31/2023* $15.500 $3.200 $0.780 $0.630 BM $0.000 $0.000 8.0 $20.110 $27.860 BN $27.860 BN $27.860 BN Holidays Scope of Work
Travel &
Subsistence

WATER WELL
DRILLER: HELPER 02/22/2023 03/31/2023* $15.500 $3.200 $0.780 $0.520 BO $0.000 $0.000 8.0 $20.000 $27.750 BN $27.750 BN $27.750 BN Holidays Scope of Work
Travel &
Subsistence
Go to increase page

FOOTNOTES
EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.

THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.

INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @ HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.

THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.

VACATION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE, LABOR MANAGEMENT COOPERATION COMMITTEE, AND VACATION TRUST FUND. EFFECTIVE 5/1/2022, INDUSTRY PROMOTION FUND IS SPLIT INTO THE INDUSTRY FUND AND THE CALIFORNIA MASONRY COUNCIL.

SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

INCLUDED IN STRAIGHT-TIME HOURLY RATE.

RATE APPLIES TO THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.

INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.

RATE APPLIES TO FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWNDURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.

INCLUDED IN BASIC HOURLY RATE.

15.b
Packet Pg. 655
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
AI
AJ
AK
AL
AM
AN
AO
AP
AQ
AR
AS
AT
AU
AV
AW
AX
AY
AZ
BA
BB
BC
BD
BE
BF
BG
BH
BI
BJ
BK
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.

IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES.

RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

INCLUDES AMOUNT WITHHELD FOR WORKING DUES.

IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES AMOUNT EQUAL TO 0.5% OF THE HOURLY RATE FOR THE ADMINISTRATIVE MAINTENANCE FUND AND THE REMAINING AMOUNT IS FOR THE JOINT ELECTRICAL INDUSTRY FUND.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS UP TO A MAXIMUM OF 10 HOURS IN ANY ONE WEEK. ALL OTHER TIME INCLUDING ALL WORK ON SATURDAYS, SUNDAYS, and HOLIDAYS IS PAID AT THE DOUBLE TIME RATE.

THE MATERIAL HANDLER MAY BE UTILIZED IN CONJUNCTION WITH BOTH INSIDE AND LINE PROJECTS. THE RATIO OF MATERIAL HANDLER TO JOURNEYMEN SHALL BE ONE (1) MATERIAL HANDLER TO THREE (3) JOURNEYMEN.

ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY. A CREW CONSISTS OF ONE (1) OR MORE EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.

INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.

INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.

RATE APPLIES TO DAILY OVERTIME HOURS UP TO AND INCLUDING 12 HOURS WORKED IN A WORKDAY OR OTHER OVERTIME HOURS BEYOND 40 HOURS IN A WORKWEEK. ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT THERE ARE LESS THAN 40 HOURS WORKED MONDAY THROUGH FRIDAY, THEN THE BALANCE OF HOURS WORKED UP TO AND INCLUDING 40 HOURS FOR THE WORKWEEK, OR UP TO 8 HOURS FOR THE WORKDAY, MAY BE WORKED ON SATURDAY AT THE STRAIGHT-TIME RATE.

CERTIFIED MANIPULATOR WORK SHALL RECEIVE $1.25 PER HOUR ABOVE THE BASIC WAGE RATE INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.

INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.

EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.

INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.

RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: WALLCOVERING ($2.00 PER HOUR), EXOTIC MATERIALS ($1.25 PER HOUR) AND LEAD ABATEMENT/REMOVAL ($1.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $2.00 PER HOUR ABOVE BASIC HOURLY RATE WHEN WORKING OVER 50 FEET ABOVE GROUND OR WATER LEVEL, $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). EMPLOYEES SHALL ALSO BE ENTITLED TO HIGH TIME PREMIUM PAY WHENEVER THE WORK PERFORMED REQUIRES PERSONAL FALL RESTRAINTS TO BE WORN BY THE EMPLOYEE. THE AMOUNT OF THE PREMIUM SHALL BE AS FOLLOWS: AN ADDITIONAL $4.00 PER HOUR WHEN WORKING FROM 100 TO 180 FEET ABOVE GROUND OR WATER LEVEL AND $6.00 PER HOUR WHEN WORKING OVER 180 FEET. SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

EMPLOYEES SHALL RECEIVE PREMIUM PAY FOR THE FOLLOWING WORK: METALIZING AND THERMAL SPRAY ($4.00 PER HOUR). SEE SCOPE PROVISIONS FOR FURTHER DETAILS ON PREMIUMS.

INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.

INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME.EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE
RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.

THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN.

THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE.

THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON EACH JOBSITE. THIS AGREEMENT MAY BE USED TO COVER MAINTENANCE AND PLANT ESTABLISHMENT. PLANT ESTABLISHMENT SHALL BE WORK COVERED BY THIS AGREEMENT. THIS WORK MAY BE PERFORMED EXCLUSIVELY BY ALL CLASSIFICATIONS OUTLINED IN THIS AGREEMENT WITHOUT THE SUPERVISION OF A JOURNEYMAN, EXCEPT FOR APPRENTICES WHO REQUIRE THE SUPERVISION OF A JOURNEYMAN INCLUDES AN AMOUNT FOR HEALTH AND WELFARE EXTENDED RESERVE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES AN AMOUNT FOR 401A-PART B PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES AN AMOUNT FOR SUPPLEMENTAL UNEMPLOYMENT BENEFITS.

AMOUNT IS FOR CONTRACT ADMINISTRATION
RATE APPLIES TO PLUMBING SERVICE AND REPAIR HOLIDAYS. FOR HOLIDAY RATE APPLICABLE TO HVAC REFRIGERATION SERVICE, PLEASE SEE HOLIDAY PROVISIONS.

INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.

RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

IN THE EVENT THAT CONDITIONS ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING ON SCHEDULED WORK DURING SUCH WEEK, WORK MAY BE PERFORMED ON SATURDAY AT STRAIGHT TIME RATES OF PAY.

INCLUDES SMOHIT AND SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER. PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.

INCLUDES SHC. EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.

RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS. ALL OTHER OVERTIME HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.

INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.

INCLUDES $0.05 FOR SCHOLAR FUND.

THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).

INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.

INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN ADDITION TO REGULAR WAGES.

15.b
Packet Pg. 656
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library BL
BM
BN
BO
RATE APPLIES TO THE FIRST 9 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.

RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.

RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.

RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/DPreWageDetermination.htm. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

Return to main page

15.b
Packet Pg. 657
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library

GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1

FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS Craft: Asbestos Worker, Heat and Frost Insulator#
Determination:

NC-3-16-1-2023-1
Issue Date:

February 22, 2023
Expiration date of determination:

July 31, 2023** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Office of the Director - Research Unit for specific rates at (415) 703-4774.

Localities:

Zone 1: All localities within Alameda, Contra Costa, Marin, Napa, San Benito, San Francisco, San Mateo, Santa Clara, Solano, and Sonoma Counties
Zone 2: All localities within Alpine, Amador, Butte, Calaveras, Colusa, Del Norte, El Dorado, Fresno, Glenn, Humboldt, Kings, Lake, Lassen, Madera, Mariposa, Mendocino, Merced, Modoc, Mono, Monterey, Nevada, Placer, Plumas, Sacramento, San Joaquin, Santa Cruz, Shasta, Sierra, Siskiyou, Stanislaus, Sutter, Tehama, Trinity, Tulare, Tuolumne, Yolo, and Yuba Counties.

Wages and Employer Payments:

Classification
(Journeyperson)
Basic
Hourly
Ratea
Health
and
Welfare
Pensionb Vacation
and
Holidayc
Training Otherd Hours Total
Hourly
Rate
Overtime
Hourly
Rate
(1 ½ X)e
Overtime
Hourly
Rate
(2 X)f
Mechanic (Zone 1) $80.91 $14.50 $7.72 $0.00 $1.60 $0.39 8.0 $105.12 $145.575 $186.03 Mechanic (Zone 2) $62.26 $14.50 $7.72 $0.00 $1.60 $0.39 8.0 $86.47 $117.60 $148.73

15.b
Packet Pg. 658
Attachment: Contract Documents - Campbell Library Renovations Project (No. 23-SS) (Campbell Library Determination: NC-3-16-1-2023-1 and NC-3-16-3-2023-1

Page 2 of 3 ends
← All documents from this meeting