2025-11-18; City Council; 04; Revising the Project Title for the Village and Barrio Traffic Circles Project, Adoption of Plans, Specifications and Contract Documents and Authorization to Advertise for

Carlsbad City Council
November 18, 2025

Document
2025-11-18; City Council; 04; Revising the Project Title for the Village and Barrio Traffic Circles Project, Adoption of Plans, Specifications and Contract Documents and Authorization to Advertise for
Meeting
November 18, 2025
Body
Carlsbad City Council
Pages
21
Original file
1.1 MB
Text extracted from the city's file for reading and search. Open the original on records.carlsbadca.gov. That file is the official record.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 162 low temperature requirement by a minimum of one performance grade, e.g., a specified "PG 64-1O" shall become a "PG 58-22 or "PG 58-16."

203-6.4 Asphalt Concrete Mixtures.

Add the following:

Conventional Asphalt concrete shall be class C2 -PG64-10 or Type III C2 -PG64-10 for surface course, and B2-PG64-10 or Type III B2-PG64-10 for base course. Asphalt concrete shall be class D2-PG70-10 for dikes and class E-PG70-10 ditches.

203-6.4.4 Composition and Grading.

Add the following:

1. Evaluation of asphalt concrete shall be determined from samples of final asphalt concrete material. In addition to evaluation of the final asphalt material, samples of aggregate, RAP, and asphalt binder will be taken for testing. In case of dispute between the Contractor and the Agency, the Engineer has the authority to request core samples for analysis from the placed asphalt concrete for any of the acceptance criteria, at the locations determined by the Engineer. All samples shall be taken in accordance with California Test 125, and the following table:

Sample Location
Asphalt Concrete • Trucks, or
• Mat behind the paver
Aggregate • Cold feed belts, or
• Hot bins prior to addition of asphalt binder
RAP • RAP system, or
• RAP feed belts
Asphalt Binder • Asphalt binder supplier, or
• Storage tanks at the plant during production

2. When behind the paver or core samples of asphalt concrete are to be used for evaluation, sufficient size samples shall be taken to ensure representative and adequate quantity of material for the required testing.

3. When using core samples, the samples must be properly prepared to safeguard against influx of outside contaminates and so that the cut surfaces do not influence the test results.

4. Material samples of the asphalt concrete shall be on a lot basis. A standard lot shall be equal to 1 day’s production or 750 tons, whichever is smaller. The samples and testing results shall be representative of their entire sample lot.

5. Table 203-6.4.4, design criteria, shall be modified per the following table, the gradation shall stay the same:

Table 203-6.4.4 – Modified (Design Criteria)
Sieve Size
Percentage Passing Sieves
A B C1 C2 D1 D2 E F
Dense
Coarse
Dense
Medium
Coarse
Coarse
Medium
Dense
Medium
Coarse
Fine
Dense
Fine
Extra
Fine
Channel
Liner
1-1/2” (37.5 mm) 100

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 163 1” (25 mm) 90-100 100
¾” (19.0 mm) 78-90 87-100 100 100
½” (12.5 mm) 64-78 70-87 90-100 95-100 100 100
3/8” (9.5 mm) 54-68 55-76 72-88 72-88 90-100 95-100 100 100 No. 4 (4.75 mm) 34-48 35-52 40-54 46-60 40-54 58-72 65-85 95-100 No. 8 (2.36 mm) 25-35 22-40 18-34 28-42 20-32 34-48 45-65 70-84 No. 30 (600 µm) 12-22 8-24 8-20 15-27 6-18 18-32 22-38 36-50 No.50 (300 µm) 8-16 5-18 4-14 10-20 2-12 13-23 16-28 23-35 No. 200 (75 µm) 3-6 0-7 1-6 2-7 0-5 2-9 6-12 6-12
Asphalt Binder % 4.5-6.0 4.7-6.5 5.0-6.5 5.0-6.5 5.3-7.0 5.3-7.0 6.0-8.0 8.0-10.0 Hveem Stability
“S Value” (min.)
37 37 35 35 32 32
Air Voids1 4% 4% 4% 4% 4% 4%

203-6.5.1 Class and Grade.

Delete the list and replace with the following:
a) No suffix if the mixture contains RAP in an amount up to 20 percent. b) "R0" if the mixture does not contain RAP, e.g., "III-C2-PG 64-10-R0." c) "R" and the percentage of RAP if the mixture contains greater than 20 percent, e.g. "III - C2-PG 64-I0-R25."
d) "WMA" if the mixture uses a warm mix asphalt technology, e.g., "III-C2-PG 64-10-WMA."

Table 203-6.5.4.

Delete in its entirety and replace with the following:

CLASS B2 B3
Sieve Size Individual
Test Result
Moving
Average
Individual
Test Result
Moving
Average
1" (25.0 mm) 100 100 100 100
3/4" (19.0 mm) 87-100 90-100 90-100 95-100
3/8" (9.5 mm) 50-80 60-75 60-84 65-80
No. 4 (4.75 mm) 30-60 40-55 40-60 45-60
No. 8 (2.36 mm) 22-44 27-40 24-50 30-45
No. 30 (600 µm) 8-26 12-22 11-29 15-25
No. 200 (75 µm) 1-8 3-6 1-9 3-7
Asphalt Binder %
Air Voids %

4.8-6.5
4%

4.8-6.5
4%
CLASS C2 C3
Sieve Size Individual
Test Result
Moving
Average
Individual
Test Result
Moving
Average
3/4" (19.0 mm) 100 100 100 100
1/2" (12.5 mm) 89 -100 95 -100 89 -100 95 - 100
3/8" (9.5 mm) 70-94 75-90 74 -100 80-95
No. 4 (4.75 mm) 44-72 50-67 50- 78 55-72
No. 8 (2.36 mm) 30-54 35-50 32-60 38-55
No. 30 (600 µm) 10-34 15 - 30 14 - 38 18 - 33
No. 200 (75 µm) 2-10 4-7 2-10 4-8
Asphalt Binder %
Air Voids %

5.0 - 6.8
4%

5.0 - 7.0
4%

CLASS D F

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 164 Sieve Sizes Combined Average Combined Average
1/2" (12.5 mm)
3/8" (9.5 mm)
100
95-100
-
100
No. 4 (4.75 mm) 65-85 95-100
No. 8 (2.36 mm) 50-70 70-80
No. 30 (600 µm) 28-40 35-50
No. 200 (75 µm) 5-14 7-16
Asphalt Binder %
Air Voids

6.0-8.0
4%

8.0-10.0

203-6.8 Storage.

Delete in its entirety and replace with the following:

1. Storage of asphalt concrete shall not be allowed. Asphalt concrete shall be transferred from the mixer by a method that does not cause segregation.

203-6.10 Sampling.

Delete in its entirety and replace with the following:

1. Aggregate samples for batch plants shall be taken from the hot bins. Aggregate samples for dryer-drum plants shall be taken in advance of the dryer -drum using devices conforming to 203-6.7.4.2.

2. Evaluation and acceptance of asphalt concrete shall be determined from samples of final asphalt concrete material. In addition to evaluation of the final asphalt material, samples of aggregate, RAP, and asphalt binder shall be taken for testing. In case of dispute between the Contractor and the Agency, the Engineer has the authority to request core samples for analysis from the placed asphalt concrete for any of the acceptance criteria, at the locations determined by the Engineer. All samples shall be taken in accordance with California Test 125, and the following table:

TABLE 203-6.10
Sampling Location
Asphalt Concrete • Trucks, or
• Mat behind the paver
Aggregate • Cold feed belts, or
• Hot bins prior to addition of asphalt binder
RAP • RAP system, or
• RAP feed belts
Asphalt Binder • Asphalt binder supplier, or
• Storage tanks at the plant during production

3. When behind the paver or core samples of asphalt concrete are to be used for evaluation, sufficient size samples shall be taken to ensure representative and adequate quantity of material for the required testing.

4. When using core samples, the samples must be properly prepared to safeguard against influx of outside contaminates and so that the cut surfaces do not influence the test results.

5. Material samples of the asphalt concrete shall be on a lot basis. A standard lot shall be equal to 1 day’s production or 750 tons, whichever is smaller. The samples and testing results shall be representative of their entire sample lot.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 165

203-6.11 Acceptance.

Delete in its entirety and replace with the following:

1. Acceptance of asphalt concrete mixtures will be based upon conformance to the gradation, asphalt binder content, air voids, and minimum stability values shown in Table 203-6.4.4. Air void values shall be between 2% and 6%. The asphalt binder content shall be within +/- 0.4 percent of the OBC shown on the respective job mix formula.

2. Acceptance of Type III asphalt concrete mixtures will be based upon conformance to the gradation, asphalt binder content, air voids, and minimum stability values shown in Tables 203-6.5.4 (A) and 203 -6.5.4 (B). Air void values shall be between 2% and 6%. T he asphalt binder content shall be within +/ - 0.4 percent of the OBC shown on the respective job mix formula.

3. Should plant gradation test results be unavailable and allowed by the Engineer, gradation may be determined in accordance with ASTM D2172 or by AASHTO T 308 with adherence to the aggregate correction factor therein. In the case of a continued dispute, final acceptance of plant produced mixtures may be based upon binder content, stability and air void values.

4. When dissimilar surface course mix characteristics are the result of production and delivery from multiple plants, the Engineer may require production and delivery from only 1 plant during any 1 day of production, unless approved by the Engineer.

SECTION 206 - MISCELLANEOUS METAL ITEMS

Add the following section:
206-7 TRAFFIC SIGNS.

206-7.1 Roadside Signs. This work shall consist of furnishing and installing roadside signs in accordance with details shown on the plans, the California Sign Specifications and these special provisions. Permanent and temporary signs shall be free from blemishes that may affect the serviceability and detract from the general sign color and appearance when viewing during daytime and nighttime from a distance of 25 feet. The face of each finished sign shall be uniform, flat, smooth, and free of defects, scratches, wrinkles, gel, h ard spots, streaks, extrusion marks, and air bubbles. The front, back and edges of the sign panels shall be free of router chatter marks, burns, sharp edges, loose rivets, delaminated skins, excessive adhesive overspray, and aluminum marks. Contractor shall provide specifications of materials for proposed installation and relocation of poles. Proposed materials shall be similar to the existing pole material (metals) to minimize rusting.

206-7.1.2 Sign Identification. The following notation shall be placed on the lower right side of the back of each sign where the notation shall not be blocked by the sign post or frame:

A. PROPERTY OF THE CITY OF CARLSBAD,
B. Name of the sign manufacturer,
C. Month and year of fabrication,
D. Type of retroreflective sheeting, and
E. Manufacturer’s identification and lot number of retroreflective sheeting.

The above notation shall be applied directly to the aluminum sign panels in 1/4 -inch upper case letters and numerals by die -stamp and applied by similar method to the fiberglass reinforced plastic signs. Painting, screening, or engraving of the notation wi ll not be allowed. The notation shall be applied without damaging the finish of the sign.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 166 206-7.1.3 Drawings. Standard signs shall be as per the most recently approved California Sign Specifications. The date of approval shall be the date most closely preceding the date of manufacture of the sign(s) or the date of the “Notice to Proceed” of this contract, whichev er is most recent.

206-7.1.4 Reflective Sheeting. All advisory signs, warning signs and all regulatory signs shall be fabricated with Type IV prismatic sheeting (High Intensity Prismatic or equivalent) or Type IX prismatic cube lens sheeting (Diamond Grade VIP or equivalent) in accordance with ASTM Designation D4956 and conforming to the requirements of these special provisions.

206-7.1.5 Sign Panel. Sign panels shall be fabricated from sheet aluminum in accordance with ASTM Designation B209. Sheet aluminum shall be pretreated in accordance with ASTM Designation B449. The surface of sheet aluminum shall be cleaned, deoxidized, and coated with a light and tightly adherent chromate conversion coating free of powdery residue. The conversion coating shall be Class 2 with a mass between 10 milligrams per square foot. Following the cleaning and coating process, the sheet aluminum shall b e protected from exposure to grease, oils, dust, and contaminants. Sheet aluminum shall be free of buckles, warps, dents, cockles, burrs, and defects resulting from fabrication.

206-7.1.6 Mounting Traffic Signs. Traffic signs shall be installed on 10 -gage or 12-gage cold- rolled steel perforated tubing posts as shown on San Diego Regional Standard drawing M-45 or, when the sign area exceeds the maximum area allowed for on that drawing, on multiple 10-gage or 12-gage cold-rolled steel perforated tubing posts. The number of posts shall be determined by the parameters in SDRS drawing M -45 or as approved by the Engineer. Traffic signs will be provided with back braces and mounting block s as approved by the Engineer consisting of 10-gage or 12-gage cold-rolled steel perforated tubing when multiple posts are used.

206-7.1.6 Traffic Sign Posts. Posts shall be constructed of 10-gage or 12-gage cold-rolled steel perforated tubing posts as shown on San Diego Regional Standard drawing M-45.

206-7.2 Temporary Traffic Signs. Temporary traffic signs shall consist of all signs used for the direction, warning, and regulation of vehicle (including bicycle) and pedestrian traffic during the Contractor’s performance of the Work. Temporary traffic signs include both stationary and portable signs.

206-7.2.1 General. This work shall consist of furnishing and installing temporary signs in accordance with details shown on the plans, the California Sign Specifications and these special provisions. Permanent and temporary signs shall be free from blemishes that may affect the serviceability and detract from the general sign color and appearance when viewing during daytime and nighttime from a distance of 25 feet. The face of each finished sign shall be uniform, flat, smooth, and free of defects, scratches , wrinkles, gel, hard spots, streaks, extrusion marks, and air bubbles. The front, back and edges of the sign panels shall be free of router chatter marks, burns, sharp edges, loose rivets, delaminated skins, excessive adhesive overspray, and aluminum marks.

206-7.2.2 Drawings. Standard signs shall be as per the most recently approved California Sign Specifications. The date of approval shall be the date most closely preceding the date of manufacture of the sign(s) or the date of the “Notice to Proceed” of this contract, whichev er is most recent.

206-7.2.3 Reflective Sheeting. All advisory signs, warning signs and all regulatory signs shall be fabricated with Type IV prismatic sheeting (High Intensity Prismatic or equivalent) or Type IX

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 167 prismatic cube lens sheeting (Diamond Grade VIP or equivalent) in accordance to ASTM Designation D4956 and conforming to the requirements of these special provisions.

206-7.2.4 Sign Panel. Sign panels shall be fabricated from sheet aluminum in accordance with ASTM Designation B209. Sheet aluminum shall be pretreated in accordance to ASTM Designation B449. The surface of sheet aluminum shall be cleaned, deoxidized, and coated with a light and tightly adherent chromate conversion coating free of powdery residue. The conversion coating shall be Class 2 with a mass between 10 milligrams per square foot. Following the cleaning and coating process, the sheet aluminum shall be protected from exposure to grease, oils, dust, and contaminants. Sheet aluminum shall be free of buckles, warps, dents, cockles, burrs, and defects resulting from fabrication.

206-7.2.5 Stationary Mounted Temporary Traffic Signs. Stationary mounted temporary traffic signs shall be installed on 10 -gage and 12-gage cold-rolled steel perforated tubing posts in the same manner shown on the State of California, Department of Transportation Standard Plans RS1, RS2, RS3 and RS4 for installation of roadside signs, except as follows:

a) Wood posts shall not be used.
b) Back braces and blocks for sign panels will not be required. c) The height to the bottom of the sign panel above the edge of traveled way shall be at least 2.1 m (7’).
d) Unless otherwise shown on the plans traffic sign posts shall conform in materials and installation to SDRS drawing M-45 and shall have one post provided for each 0.48 m2 (5 ft2) of sign area, or the signs may be installed on existing lighting standards when approved by the Engineer.
e) Sign panels mounted on temporary traffic sign posts shall conform to the requirements of these special provisions.

206-7.2.6 Temporary Traffic Sign Posts. Posts shall be 10 -gage or 12 -gage cold-rolled steel perforated tubing used for the support and stabilization of stationary mounted temporary signs.

Post size and number of posts shall be as shown on the plans, except that when stationary mounted signs are installed and the type of sign installation is not shown on the plans, post size and the number of posts will be determined by the Engineer. Sign panels for stationary mounted signs shall consist of reflective sheeting applied to a sign substrate.

206-7.2.7 Portable Temporary Traffic Signs. Each portable temporary traffic sign shall consist of a base, standard or framework and a sign panel. The units shall be capable of being delivered to the site of use and placed in immediate operation. Sign panels for portable signs shall conform to the re quirements of these special provisions, or shall be cotton drill fabric, flexible industrial nylon fabric, or other approved fabric. Fabric signs shall not be used during the hours of darkness.

Size, color, and l egend requirements for portable signs shall be as described for stationary mounted sign panels in section 206 -7.2 of these special provisions. The height to the bottom of the sign panel above the edge of traveled way shall be at least 0.3 -m (12”). All parts of the sign standard or framework shall be finished with 2 applications of orange enamel which will match the color of the sign panel background. Testing of paint will not be required.

Add the following section:
206-7.3 Portable Changeable Message Sign (PCMS).

Add the following section:
206-7.3.1 General. Each portable changeable message sign (PCMS) unit shall consist of a controller unit, a power supply, and a structural support system all mounted on a trailer. The

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 168 PCMS unit shall be assembled to form a complete self-contained portable changeable message sign, which can be delivered to the site of the work and placed in immediate operation. The complete PCMS unit shall be capable of operating in an ambient air temperature range of -20ºC (-4ºF) to +70ºC (158ºF) and shall not be affected by unauthorized mobile radio transmissions.

The trailer shall be equipped so that it can be leveled and plumbed. Full operation height shall be with the bottom of the sign at least 2.1 m (7') above the ground and the top no more than 4.4 m (14.5') above the ground. After initial placement, PCMS shall be moved from location to location as directed by the Engineer.

As part of the bid item “Traffic Control,” at least one PCMS will be required in each direction of travel affected by the work on Carlsbad Boulevard. The traffic control plans shall clearly show the PCMS’ locations. The PCMS shall warn motorists of the wor k one (1) week prior to start of the work and for the entire duration of the work.

Add the following section:
206-7.3.2 Message Board. The message displayed on the PCMS shall be visible from a distance of 460 m (1500') and shall be legible from a distance of 230 m (750'), at noon on a cloudless day, by persons with vision corrected to 20/20. The sign panel shall be 3-line matrix and shall display not less than 7 characters per line. Sign messages to be displayed shall be as approved by the Engineer. The sign face shall be flat black and shall be protected from glare of the sun by a method which does not interfere with the clarity of the sign message. The sign shall be raised and lowered by means of a power driven lifting mechanism. The matrix sign shall be capable of complete alphanumeric selection.

Lamp matrix type signs shall be equipped with an automatic dimming operational mode that automatically compensates for the influence of a temporary light source or other abnormal lighting conditions. The sign shall have manual dimming operation modes of 3 or more different lamp intensities.

Matrix signs not utilizing lamps shall be either internally or externally illuminated at night.

The controller shall be an all solid-state unit containing all the necessary circuitry for the storage of at least 5 pre -programmed messages. The controller shall be installed in a location allowing the operator to perform all functions from one position. A keyboard entry system shall be provided to allow an operator to generate an infinite number of additional messages over the pre - programmed stored messages. The keyboard shall be equipped with a security lockout feature to prevent unauthorized use of the controller. The controller shall contain a nonvolatile memory to hold the keyboard created messages in memory during periods when the power is not activated.

The controller shall provide for a variable message display rate which allows the operator to match the information display to the speed of the approaching traffic. The flashing off time shall be operator adjustable within the control cabinet.

Add the following section:
206-7.3.3 Operation and Maintenance. PCMS shall be furnished, placed, operated, and maintained at locations shown on the plans, specified herein, or designated by the Engineer. The PCMS will be diligently maintained and repaired by the Contractor throughout the project in accordance with the manufacturer's recommendations. When ownership is transferred to the City (at the end of the job), it must be demonstrated to be in good working condition, and meet the provisions of these specifications, including current registration.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 169 Add the following section:
206-7.3.4 Measurement and Payment. The cost for PCMS shall be included in the bid item Traffic Control and include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in furnishing, placing, operating, maintaining, repairing, replacing, transporting from location to location, and delivery of the signs to the City at the completion of the construction, in good working order, and as directed by the Engineer, and no other compensation will be made.

Add the following section:
206-8 LIGHT GAGE STEEL TUBING AND CONNECTORS.

Add the following section:
206-8.1 General. This Section pertains to 10-gage and 12-gage cold-rolled steel perforated tubing used for the support and stabilization of signs. All shapes shall have a galvanized finish and shall be cold -roll-formed steel conforming to ASTM Designation A -446, Grade A. Galvanizing shall conform to ASTM A-525, Designation G-90. Galvanizing shall be performed after all forming and punching operations have been completed. Cold-rolled steel perforated tubing shall be perforated on all four faces with 11mm (7/16”) holes on 25 mm (1”) centers.

Add the following section:
206-8.2 Tolerances. Wall thickness tolerance shall not exceed +0.28 mm, -0.13 mm (+0.011”, -0.005”). Convexity and concavity measured in the center of the flat side shall not exceed a tolerance of +0.25 mm (+0.010”) applied to the specific size determined at the corner.

Straightness tolerance variation shall not exceed 1.6 mm in 1 m (1/16” in 3’). Tolerance for corner radius is 4.0mm (5/32”), plus or minus 0.40 mm (1/64“). Weld flash on corner -welded square tubing shall permit 3.60 mm (9/64”) radius gage to be placed in the corner. Using 10 -gage or 12-gage square tube, consecutive size tubes shall telescope freely for 3.1m (10’). Tolerance on hole size is plus or minus 0.40 mm (1/64“) on a size. Tolerance on hole spacing is plus or minus

3.2 mm in 6.1 m (1/8” in 20’). In addition, for the following specific sizes of light gage steel tubing, dimensional tolerances shall not exceed those listed in tables 206-8.2 (A) and 206-8.2(B).

TABLE 206-8.2(A)

LIGHT GAGE STEEL TUBING SIZE TOLERANCE
Nominal Outside
mm
Dimensions
(inches)
Outside Tolerance for
mm
All Sides at Corners
(inches)
25 x 25 (1 x 1) 0.13 0.005
32 x 32 (11/4 x 11/4) 0.15 0.006
38 x 38 (11/2 x 11/2) 0.15 0.006
44 x 44 (13/4 x 13/4) 0.20 0.008
51 x 51 (2 x 2) 0.20 0.008
56 x 56 (23/16 x 23/16) 0.25 0.010
57 x 57 (21/4 x 21/4) 0.25 0.010
64 x 64 (21/2 x 21/2) 0.25 0.010
51 x 76 (2 x 3) 0.25 0.010

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 170 TABLE 206-8.2(B)

LIGHT GAGE STEEL TUBING SQUARENESS OF SIDES AND TWIST
Nominal
Outside
mm
Dimension
(Inches)
Squar
mm
eness(1)
(Inches)
Twist Permissible
mm(2)
in 900 mm (3”)
(Inches)(2)
25 x 25 (1 x 1) 0.15 0.006 1.3 0.050
32 x 32 (1-1/4 x 1-1/4) 0.18 0.007 1.3 0.050
38 x 38 (1-1/2 x 1-1/2) 0.20 0.009 1.3 0.050
44 x 44 (1-3/4 x 1-3/4) 0.25 0.010 1.6 0.062
51 x 51 (2 x 2) 0.30 0.012 1.6 0.062
56 x 56 (2-3/16 x 2-3/16) 0.36 0.014 1.6 0.062
57 x 57 (2-1/4 x 2-1/4) 0.36 1.014 1.6 0.062
64 x 64 (2-1/2 x 2-1/2) 0.38 0.015 1.9 0.075
51 x 76 (2 x 3) 0.46 0.018 1.9 0.075
(1) Tubing may have its sides failing to be 90 degrees to each other by the tolerance listed. (2) Twist is measured by holding down the edge of one end of a square tube on a surface plate with the bottom side of the tube parallel to the surface plate and noting the height that either corner on the opposite end of the bottom side is above the surface plate.

Add the following section:
206-8.3 Fasteners. Fasteners used to assemble cold-rolled steel perforated tubing shall be steel “pull-through” electrogalvanized rivets with 9.5 mm (3/8”) diameter shank, 22 mm (7/8”) diameter head, and a grip range of from 5 mm (0.200”) to 0.90 mm (0.356”). The fasteners shall conform to ASTM B-633, Type III.

Add the following section:
206-9 PORTABLE CHANGEABLE MESSAGE SIGN.
206-9.1 General.

1. Each portable changeable message sign (PCMS) unit shall consist of a controller unit, a power supply, and a structural support system all mounted on a trailer. The PCMS unit shall be assembled to form a complete self-contained portable changeable message sign, which can be delivered to the site of the Work and placed in immediate operation. The complete PCMS unit shall be capable of operating in an ambient air temperature range of -20ºC (-4ºF) to +70ºC (158ºF) and shall not be affected by unauthorized mobile radio transmissions.

2. The trailer shall be equipped so that it can be leveled and plumbed. Full operation height shall be with the bottom of the sign at least 2.1 m (7') above the ground and the top no more than

4.4 m (14.5') above the ground. After initial placement, PCMS shal l be moved from location to location as directed by the Engineer.

206-9.2 Message Board.

1. The message displayed on the PCMS shall be visible from a distance of 460 m (1500') and shall be legible from a distance of 230 m (750'), at noon on a cloudless day, by persons with vision corrected to 20/20. The sign panel shall be 3-line matrix and shall display not less than 7 characters per line. Sign messages to be displayed shall be as approved by the Engineer.

The sign face shall be flat black and shall be protected from glare of the sun by a method which does not interfere with the clarity of the si gn message. The sign shall be raised and lowered by means of a power driven lifting mechanism. The matrix sign shall be capable of complete alphanumeric selection.

2. Lamp matrix type signs shall be equipped with an automatic dimming operational mode that automatically compensates for the influence of a temporary light source or other abnormal

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 171 lighting conditions. The sign shall have manual dimming operation modes of 3 or more different lamp intensities.

3. Matrix signs not utilizing lamps shall be either internally or externally illuminated at night.

4. The controller shall be an all solid -state unit containing all the necessary circuitry for the storage of at least 5 pre-programmed messages. The controller shall be installed in a location allowing the operator to perform all functions from 1 position. A keyboard entry system shall be provided to allow an operator to generate an infinite number of additional messages over the pre -programmed stored messages. The keyboard shall be equipped with a security lockout feature to prevent unauthorized use of the co ntroller. The controller shall contain a nonvolatile memory to hold the keyboard created messages in memory during periods when the power is not activated. The controller shall provide for a variable message display rate which allows the operator to match the information display to the speed of the approaching traffic. The flashing off time shall be operator adjustable within the control cabinet.

206-9.3 Operation and Maintenance.

1. PCMS shall be furnished, placed, operated, and maintained at locations shown on the Plans, specified in this section, or designated by the Engineer. The PCMS will be diligently maintained and repaired by the Contractor throughout the Project in accordance with the manufacturer's recommendations. When ownership is transferred to the Agency (at the end of the job), it must be demonstrated to be in good working condition, and meet the provisions of these Specifications, including current registration.

206-9.4 Measurement and Payment.

1. The Contract unit price PCMS shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the Work involved in furnishing, placing, operating, maintaining, repairing, replacing, transporting from location to location, and delivery of the signs to the Agency at the completion of the construction, in good working order, and as directed by the Engineer, and no other compensation will be made.

Add the following section:
206-9.5 Relocation. All metal to metal connections shall be same material to reduce corrosion.

Add the following section:
206-10 GRATES
Grates/slotted cover and frame shall be model ZHURN Z723-HDG frame and grate with class C galvanized heel-proof longitudinal ductile iron grate and vandal proof lockdown or approved equal.

The grate shall be bolted to the frame per manufacturer’s recommendations. The trench grate frame shall be mild steel and shall conform to ASTM A36.

SECTION 207 – GRAVITY PIPE

207-2 REINFORCED CONCRETE PIPE (RCP).
207-2.5 Joints.

Add the following:

1. When watertight joints are indicated on the Plans, they shall be of the rubber -gasketed type meeting the following requirements:
a) Pipe designated in the Plans as “pressure pipe” with a design hydraulic grade line at or above the soffit, or where any portion of the pipe may be intermittently subjected to ground water shall have bell and groove spigot joints with O -rings conforming with ASTM C361.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 172 The joint shall be designed for an internal hydrostatic head of 30 feet and a test duration of 20 minutes.

b) Pipe joints for other gravity installations shall be bell and groove spigot joint with O -rings conforming with ASTM C443.
207-2.9 Basis for Acceptance.
207-2.9.1 General.

Delete in its entirety and replace with the following:

1. The basis for acceptance shall be the D -load bearing strength test, compliance with these Specifications, inspection of the pipe manufacture and inspection of the completed pipe.

SECTION 211 – MATERIAL TESTS

211-3 INFILTRATION CAPACITY TEST.
211-3.4 Infiltration Capacity.

Delete in its entirety and replace with the following:

1. Infiltration Capacity shall be calculated as follows:
a) The formula for U.S. Standard Measures shall be: IC=(V)(3,326,400)/( p)(d1)(d2)(t) inches per hour.
b) The formula for SI Units shall be: IC=(V)(14.4Xl 06)/( p)( d1 1)(d2)( t) cm per hour. Where:

IC is Infiltration Capacity
V is the volume of water in gallons or liters
d1 and d2 are the dimensions that were determined in part 211-3.3 p is approximately 3.14159

211-6 RAP CORRECTION FACTOR.
211-6.1 General.

Delete in its entirety and replace with the following:

1. A RAP correction factor must be determined for asphalt concrete mixtures containing greater than 20 percent RAP. The RAP correction factor shall be determined in accordance with Caltrans Lab Procedure LP -9 dated May 22, 2006. This factor shall be used in d etermining the combined gradation of the virgin aggregates and RAP.

SECTION 213 - ENGINEERING GEOSYNTHETICS

213-5 GEOTEXTILES AND GEOGRIDS.

Add the following:

Geotextile types shall be used for the applications listed in Table 213-5.2(F) Table 213-5.2(F)

GEOTEXTILE APPLICATIONS

Application of Geotextile
Type
Designation
Separation of Soil and Street Structural Section 90WS
Separation of Soil and Subsurface Aggregate Drain 180N
Reinforcement of Street Structural Section 200WS
Remediation and Separation of Soil 270WS

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 173

Application of Geotextile
Type
Designation
Reinforcement of Soil 270WS
Drainage at the Interface of Soil Structures N/A
Drainage at the Interface of Soil and Structures N/A
Rock Slope Protection Fabric for Rock Sizes Below 225 kg (¼ Ton) 180N Rock Slope Protection Fabric for Rock Sizes Including and Above 225 kg (¼ Ton) 250N Plant Protection Covering 90N
Erosion Control Fence with 14 AWG - 150 mm x 150 mm (6”x6”) Wire and 3 m (10’) Post Spacing
90WS
Erosion Control Fence with 1.8 m (6’) Post Spacing and No Wire Fencing 200WS

Add the following section:
213-6 EROSION CONTROL SPECIALTIES.

213-6.1 Gravel bags. Gravel bags for the use of temporary erosion control shall be burlap type, filled with no less than 23kg (50 lbs) of 19 mm (3/4“) crushed rock and securely tied closed. Plastic bags are not acceptable.

213-6.2 IMPERMEABLE LINER . Impermeable liner shall be a 30 -mil, single-ply, construction Polyvinyl Chloride (PVC) geomembrane material made with virgin resins and meeting the requirements of ASTM D7176. Attachment hardware shall consist of an aluminum bar with stainless steel anchor bolts and washers per the dimensions shown on the Plans.

SECTION 214 – TRAFFIC STRIPING, CURB AND PAVEMENT

MARKINGS, AND PAVEMENT MARKERS

Add the following section:
214-4 PAINT FOR STRIPING AND MARKINGS
Green traffic paint shall be Roadmax RMP 100 Series Green Paint or approved equal.

Paint to meet federal spec TT-P-1952F Type II.

Green paint color code and swatch shall be submitted for city approval prior to installation.

214-6 PAVEMENT MARKERS
214-6.1 Types of Markers.

Add the following section:
h) Temporary Reflective Pavement Markers. Temporary pavement markers shown on the plans and required in the specifications shall be one of the types shown in Table 214 -5.1(A), or equal thereto.

TABLE 214-6.1.1

TEMPORARY REFLECTIVE PAVEMENT MARKERS
Type Manufacturer of Distributor

TOM- Temporary Overlay
Markers
Davidson Traffic Control Products, 3110 70 th Avenue East, Tacoma, WA 98424, (877) 335-4638

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 174 Add the following section:
214-8 PERMANENT REFLECTIVE CHANNELIZER . Reflective Channelizer shall be new surface-mounted type and shall be furnished, placed, and maintained at the locations shown on the plans. Reflective channelizer posts shall be orange in color. Reflective channelizers shall have affixed white reflective sheeting as specified in the special provisions. The reflective sheeting shall be 75 mm x 300 mm in size. The reflective sheeting shall be visible at 300 m at night under illumination of legal high beam headlights, by persons with vision of or corrected to 20/20.

Reflective channelizer shall be one of the types shown in Table 214-5.2(A), or equal thereto.

TABLE 214-8.1.1

REFLECTIVE CHANNELIZER
Type Manufacturer of Distributor
Safe-Hit SH336SMA Safe-Hit, A Division of Energy Absorption Systems, Inc. 35 East Wacker Drive, Suite 1100
Chicago, IL 60602
(800) 537-8958
Carsonite "Super Duck" SDR3036 Carsonite Composites, LLC 605 Bob Gifford Boulevard
Early Branch, SC 29916
(800) 648-7916
Repo "The Replaceable Post" Western Highway Products
10680 Fern Avenue
Stanton, CA 90680
(800) 854-3360

The Contractor shall provide the Engineer with a Certificate of Compliance in accordance with the provisions of Section 2 -5.3.3 “Submittals”. Said certificate shall certify that the permanent reflective channelizers comply with the plans and specifications and conform to the prequalified design and material requirements approved by the engineer and were manufactured in accordance with the approved quality control program.

SECTION 216 – PRECAST REINFORCED CONCRETE BOX

216-4 TESTING REQUIREMENTS.
216-4.2.2 Acceptance.

Delete the first paragraph and replace with the following:

1. When the average compressive strength of all cylinders tested is equal to or greater than the specified compressive strength of the PCC, and not more than 10 percent of the cylinders tested have an average compressive strength less than 90 percent of the s pecified compressive strength, and no cylinder tested has a compressive strength less than 85 percent of the specified compressive strength, the lot will be accepted.

SECTION 217 – BEDDING AND BACKFILL MATERIALS

217-1 BEDDING MATERIAL.
217-1.1 General.

Add the following:

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 175

1. Bedding for pressure pipe of any material shall conform with the City of Carlsbad Engineering Standards, Volumes 2 and 3.

217-1.2 Bedding Material for Plastic Pipe.

Delete the second paragraph and replace with the following:

1. For HDPE, PVC solid wall, and PE solid wall pipe in gravity applications, the bedding material shall be crushed rock conforming to the requirements shown in Table 217 -1.2 unless otherwise specified or shown on the Plans.

217-2 TRENCH BACKFILL.
217-2.1 General.

Delete TABLE 217-2.1 and replace with the following:

TABLE 217-2.1
Zone Zone Limits Max. Rock Size
(greatest dimension)
Sand Equivalent
(Excluding Rock)
Backfill Zone From subgrade to
12” (300 mm) above
top of pipe or conduit
4” (150 mm) Not less than 20 unless
otherwise shown on the
Plans or specified in the
Special Provisions.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 176

SUPPLEMENTAL PROVISIONS
TO

STANDARD SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION

PART 3, CONSTRUCTION METHODS

SECTION 300 – EARTHWORK

300-1 CLEARING AND GRUBBING.
300-1.1 General.

Add the following to the third paragraph:

During surface clearing operations, the Contractor shall not cover or bury any plant growth or other objectionable materials. If the Contractor cannot successfully separate the plant growth from the surface soil and advertently or inadvertently mixes organ ic or other objectionable materials with the soil, the soil so contaminated shall be removed from the site by the Contractor. All costs, if any, associated with removing the soil mixed with organic or other objectionable materials and importing soil to replace said contaminated soil shall be borne by the Contractor and no additional payment shall be made to the Contractor therefor.

Add the following:

Also included in clearing and grubbing shall be removal and disposal of existing street poles and lights, metal guard rail, fences, asphalt concrete and aggregate base, cold mill, concrete curb and gutter, concrete sidewalk, existing gate, existing headwalls, rip -rap, traffic signs, and other existing features which interfere with the work. Whether or not such items are shown on the plans they shall be removed as a part of clearing and grubbing. Existing underground pipes and conduits that are shown on the plans and designated to be removed shall be removed by the Contractor as a part of clearing and grubbing. Prior to any demolition and removal, Contractor shall sawcut existing improvements to neat, clean lines as shown on the Demolition Plans.

Contractor shall perform, at a minimum, those sawcuts identified as “Sawcut” on the Demolition Plans and as directed by the Engineer. All sawcuts by the Contractor shall be considered included in the lump sum price paid for “Clearing and Grubbing” and the various bid items and no additional compensation shall be allowed therefor.

The Contractor shall prevent sawcut slurry discharges to gutters, storm drains, and watercourses.

The Contractor shall shovel, absorb or vacuum the slurry residue from the pavement or gutters and remove from the site at the end of the day or job (whichever is sooner).

Delete the following subsection:
300-1.2 Root Pruning and Tree Trimming.

300-1.3 Measurement.

Delete in its entirety and replace with the following:

1. Clearing and grubbing, if measured for payment, will be measured by the acre or lump sum.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 177 300-1.4 Payment.

Modify as follows:

Payment for clearing and grubbing shall be made at the contract lump sum price for clearing and grubbing within the project limits and at stockpile locations and no other payments will be made.

Unless otherwise noted on plans, the Contractor shall remove a ll existing abandoned pipelines and conduits of any type, or use, and pipelines and conduits of any type, or use, that are abandoned during the course of the work and shall replace said pipelines and conduits with properly compacted soils. Payment for remo val and disposal of abandoned utilities shall be included in the lump-sum bid for Clearing and Grubbing, and no additional payment will be made.

300-2 UNCLASSIFIED EXCAVATION.

300-2.1 General.

Add the following:

Unclassified excavation shall include removal and stockpile of suitable material, recompaction, mixing, grading for mitigation work, trenching and backfilling of storm drains, sewers, other utilities, disposal of unsuitable materials not included in the bid item for clearing and grubbing, all cut and fill including removal and recompaction of unsuitable soil, salvaging clean excavated material and filling areas to the required grades and cross section. Unclassified excavation shall be utilized onsite to make all fills shown on the plans. Unclassified excavation shall also include scarification and moisture adjustment and compaction of the top 300 mm (1’) of the subgrade in the roadway prism in cut areas to 95 percent relative compaction, wetland mitigation grading and attendant work, export of remaining excess material to a disposal site or spoil area acquired by the Contractor and pumping and disposal of storm and ground water.

300-2.2.1 General.

Add the following:

Alluvial and colluvial removal and recompaction shall consist of excavating, blending and recompacting loose soils in areas that are designated to receive fills. The existing loose soils shall be removed by the Contractor until a firm unyielding surface is exposed or to a depth determined by the Engineer. If the excavated material contains 4%, or more, water than the optimum moisture content the Contractor shall blend the wet soil with soils having a lower moisture content and/or spread the excavated material in a manner that enables the material to dry to optimum moisture content. The cost of spreading and/or drying shall be included in the contract unit price for removal and recompaction. The excavated material shall be placed and compacted in accordance w ith section 300-4 of the specifications except that section 300-4.9, Measurement and Payment, shall not apply.

Add the following section:
300-2.2.3 Compressible Soil. Compressible soils such as existing uncontrolled or unacceptable fill, alluvium, and colluvium may exist within portions of the Project site. Where required by the Engineer, the Contractor shall remove such compressible soils from areas to receive fill o r from areas upon which surface improvements are to be placed. The removal and disposal of such compressible soils shall be paid for at the Contract Unit Price for unclassified excavation unless it is considered otherwise unsuitable by the Engineer in whic h case it may be paid for in accordance with section 300-2.2.1.

300-2.2.4 Instability of Cuts. The Contractor shall remove additional material as directed by the Engineer to improve the stability of excavated cuts. The removal of such excavated material shall be paid for at the Contract Unit Price for unclassified excavation unless it is considered otherwise

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 178 unsuitable by the Engineer, in which case it will be paid for in accordance with Subsection 300 -

2.2.1. 300-2.5 Slopes.

Add the following:

The hinge points (the top and bottom) of slopes shall be located within 75 mm (0.25’) of the locations shown on the plans.

Add the following after the first sentence of the first paragraph:

A slope shall be defined as any area steeper than three horizontal to one vertical.

300-2.6 Surplus Material.

Add the following:

The Contractor shall haul and dispose of all surplus material from the project. The Contractor shall utilize highway legal haul trucks for this export of material from the project site and to a site secured by the Contractor. No earth moving equipment or s pecial construction equipment, as defined in section 565 of the California Vehicle Code, will be allowed for hauling material on public streets.

300-2.9 Payment.

Substitute the following:

Payment for all unclassified excavation will be made at the Contract Lump Sum price bid for unclassified excavation and shall include compensation for surveying, staking, preparation of earthwork quantity reports, placement, compaction, soil remediation, moisture adjustment and water therefore, rework of compressible soils, excavation, sloping, rounding tops and ends of excavation, matching existing graded slopes, grading, stockpiling, access road, temporary detour roads, earthen swales and drainage channel s as shown on the drawings or required by the contract documents, exporting and disposing of surplus material and unsuitable material shown on the plans or specified herein to be removed, stockpiling, placing and compacting, mixing, grading of mitigation site, salvaging clean and suitable material and filling areas to th e required grades and cross sections. Unclassified fill , and all work incidental to Section 300 -4.8 and construction of transitions will be paid for as a part of unclassified excavation, and no additional payment will be made therefore.

When required by the plans or specifications or where directed by the Engineer, the excavation and stockpiling of selected material will be paid for at the Contract Lump Sum price for unclassified excavation. Removing such selected material from the stockpile and placing it in its final position will also be paid for at the Contract Lump Sum Price for unclassified excavation and no additional compensation will be allowed therefor.

Payment for work performed under sections 300-2.2.1, 300-2.2.2, 300-2.2.3 and 300-2.2.4, when the Engineer determines that the soils are unsuitable, shall be made for the actual labor, materials and equipment used to accomplish the work as per section 3 -3 EXTRA WORK of the specifications.

Add the following section:
300-2.10 Grading Tolerance. The Contractor shall finish excavated areas other than slopes and subgrade below structures, within the roadway and sidewalk areas within 30 mm (0.1’) of the grades shown on the plans. Subgrade tolerances shall conform to the requirements of section 301-1.4 SSPWC.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 179 300-3 STRUCTURE EXCAVATION AND BACKFILL.

300-3.1 General.

Add the following:

The Contractor shall excavate to the lines and levels required and/or shown on the Drawings. The Contractor shall provide all shoring, bracing, cribbing, pumping, and planking required. The Contractor shall excavate and maintain the bottom of all trenches in a condition that is level, firm, clean and free from all debris or foreign matter. Excavations shall be kept free from water at all times. The Contractor shall remove any unsuitable material encountered below grade as directed by the Engineer.

300-3.7 Payment.

Add the following:

Dewatering shall be paid for as an incidental to unclassified excavation and no additional compensation will be made therefor.

300-4 UNCLASSIFIED FILL.

300-4.2 Preparation of Placement Areas.

Add the following:

Except as provided in section 300 -4.7, “Compaction”, areas proposed for improvements all fill (including backfill and scarified ground surfaces) shall be compacted by the Contractor to no less than 90 percent of maximum dry density as determined in accordance with ASTM Test Procedure D1557-91.

300-4.5 Placement.

Add the following:

The Contractor shall perform grading such that the upper 900 mm (3’) of fill placed in the roadway pavement area is composed of properly compacted low expansive soils. The more highly expansive soils shall be placed in the deeper fill areas and properly compacted or exported from the site. Low expansive soils are defined as those soils that have an Expansion Index of 50 or less when tested in accordance with 1994 UBC Standard 18 -2 as published by the International Conference of Building Officials. Should insufficient soils meeting the requirement of an expansion index of 50 or less be present within the limits of work, soils of the least expansion index that are available within the limits of work shall be incorporated in the upper 900 mm (3’) of fill placed in the roadway.

The Contractor shall break rock encountered in the excavation into particles of less than 75 mm (3”). Particles with dimensions greater than 75 mm (3”) shall be uniformly distributed over the area to be filled so that construction equipment can be operated in such a manner that the larger pieces will be broken into smaller particles and become incorporated with the other materials in the layer.

This requirement for particle size reduction does not apply to cobbles, small boulders, and small hard rocks found within the surface soils and formational materials. Rocks having any dimension greater than 460mm (18”) shall not be incorporated into the fill. Rock exceeding 150 mm (6”) in diameter shall not be placed in the upper 900 mm (3’) of any fill. When there are large quantities of rock to be placed in the fill, rocks shall not be nested but shall be spread with sufficient room between them so that intervening voids can be adequately filled with fine material to form a dense, compact mass. Oversize material which cannot be utilized for erosion mitigation or landscaping onsite shall be broken to acceptable sizes or removed from the site by the Contractor. If disposed of within the City of Carlsbad, a separate grading permit will be required for disposal of rock.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 180 300-4.6 Application of Water.

Add the following:

The Contractor shall place all fill soil at a moisture content no less than one (1) percent below optimum moisture as determined by ASTM test D-1557-91.

300-4.7 Compaction.

Add the following:

The Contractor shall compact all fill soils placed within the top 1 m (3’) of roadway subgrade to a minimum of 95 percent relative compaction. On all areas to receive planting, the top 150 mm (6”) shall be compacted to 85%, +2% -5%, to allow for plant growth.

300-4.8 Slopes.

Add the following:

Feathering of fill over the tops of slopes will not be permitted. The Contractor shall compact the faces of fill slopes with a sheep’s foot roller at vertical intervals no greater than 600 mm (2’) or shall be built and cut back to finish grade. In addition , if not over built and cut back, the face of the slope shall be track walked upon completion.

300-4.9 Measurement.

Delete in its entirety and replace with the following:

The following: Unclassified fill, grading, shaping, compacting or consolidating, slope rounding, construction of transitions and all work included in and incidental to Section 300-4, “Unclassified Fill” will be paid for as a part of Unclassified Excavation, and no additional payment will be made therefor.

300-4.10 Payment.

Delete in its entirety and replace with the following:

Unclassified fill, grading, shaping, compacting or consolidating, slope rounding, construction of transitions and all work included in and incidental to Section 300-4, “Unclassified Fill” will be paid for as a part of Unclassified Excavation, and no additional payment will be made therefor.

300-5 BORROW EXCAVATION.

Add the following section:
300-5.2.1 Imported Borrow Properties. The Contractor shall provide imported borrow that is clean well graded soil consisting of material conforming to all of the requirements in Table 300-5.2.1(A) and the following requirements. Rock included in the top 1 m (3’) of imported borrow shall be particles of less than 75 mm (3”). Rock included below the top 1 m (3’) of imported borrow shall be particles of less than 150 mm (6”).

TABLE 300-5.2.1(A)

IMPORTED BORROW PROPERTIES
Tests Test Method No. Requirements
R-Value Calif. 301 40 Min.

Expansion Index UBC Standard 18-2 10 Max.

Plasticity Index ASTM D 424 4 Max.

Sieve Analysis ASTM D 422 Percent Passing 75
 (No. 200) 15 Max.

300-9 GEOTEXTILES FOR EROSION CONTROL.

Modify as follows:
300-9 GEOTEXTILES FOR EROSION CONTROL AND WATER POLLUTION CONTROL.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 181 Add the following section:
300-9.2 General. The Contractor shall provide erosion control and water pollution control conforming to the requirements shown on the plans, as specified herein, and as elsewhere required by the Contract Documents. Erosion control and water pollution control shall include the work specified herein, and such additional measures, as may be directed by the Engineer, to meet Best Management Practices, as defined herein, and to properly control erosion and storm water damage of the limits of work and construction impacts upon areas receiving drainage flows from within the limits of work.

Add the following section:
300-9.2.1 Grading Controls. The Contractor shall protect all areas that have been graded and/or cleared and grubbed as well as areas that have not been graded and/or cleared and grubbed within the limits of work from erosion. The Contractor shall provide temporary earth berms, gravel bags, silt fences, stabilized construction entrances and similar measures, coordinated with its construction procedures, as necessary and as shown on the plans to control on site and off site erosion during the construction per iod. The Contractor will be required to protect areas which have been cleared and grubbed prior to excavation or embankment operations, and which are subject to runoff during the duration of the contract. The criteria used to determine the appropriate erosion control measures shall be the “Best Management Practices”, hereinafter BMP, defined and described in the “Stormwater Best Management Practices Handbook, Construction ”, December 2019 edition as published by the California Stormwater Quality Association. The Contractor shall maintain a copy of the “Stormwater Best Management Practices Handbook, Construction”, December 2019 edition on the project site and shall conduct its operations in conformity to said Handbook.

Temporary erosion control measures provided by the Contractor shall include, but not be limited to, the following:
a) Embankment areas, while being brought up to grade and during periods of completion prior to final roadbed construction, shall be graded so as to direct runoff into impoundment areas within the limits of work where such runoff shall have pollutants removed by BMP methods. b) The Contractor shall provide protection by BMP measures to eliminate erosion and the siltation of downstream facilities and adjacent areas. These measures shall include, but shall not be limited to: temporary down drains, either in the form of pipes or pav ed ditches with protected outfall berms; graded berms around areas to eliminate erosion of embankment slopes by surface runoff; confined ponding areas to desilt runoff; and to desilt runoff. c) Excavation areas, while being brought to grade, shall be protected from erosion and the resulting siltation of downstream facilities and adjacent areas by the use of BMP measures.

These measures shall include, but shall not be limited to, methods shown on the plans and described herein.

Add the following section:
300-9.2.2 Payment. Full compensation for performing erosion control and water pollution control, conforming to the operational requirements herein, of the BMP and conforming to the requirements of the Federal Water Pollution Control Act, including the latest amendments thereto, which is not a part of the planned permanent work or included as a separate bid item shall be considered as included in the contract price bid for unclassified excavation , and no additional compensation will be allowed therefor.

ADD the following section:
300-13 STORM WATER POLLUTION PREVENTION PLAN.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 182 300-13.1 Storm Water Pollution Prevention Plan. As part of the storm water pollution prevention work, the Contractor shall prepare and submit Storm Water Pollution Prevention Plan, hereafter referred to as the “SWPPP,”. The SWPPP shall conform to the requirements of the “Greenbook” Standard Specifications for Public Works Construction, the requirements in the California Storm Water Quality Association, Stormwater Best Management Practice Handbook, Construction (“Handbook”), the requirements of the Permit, the requirements in the plans and these supplemental provisions.

300-13.1.1 SWPPP Document
Within 15 calendar days after the execution of the contract, the Contractor shall submit 3 copies of the SWPPP to the Engineer, in accordance with Section 2 -5.3.3 of these Special Provisions.

Contractor will be provided the digital format for SWPPP to comp lete required sections. If revisions are required, as determined by the Engineer, the Contractor shall revise and resubmit the SWPPP within 15 days of receipt of the Engineer’s comments and shall allow 5 days for the Engineer to review the revisions. Upon the Engineer’s acceptance of the SWPPP, 3 additional copies of the SWPPP, incorporating the required changes, shall be submitted to the Engineer. In order to allow construction activities to proceed, the Engineer may conditionally approve the SWPPP while minor revisions are being completed.

The objectives of the SWPPP shall be to identify pollution sources that may adversely affect the quality of storm water discharges associated with the project and to identify, construct, implement and maintain storm water pollution prevention measures, her eafter referred to as control measures, to reduce to the extent feasible pollutants in storm water discharges from the construction site both during and after construction is completed under this contract.

The SWPPP shall incorporate control measures in the following categories:

1. Soil stabilization practices;

2. Sediment control practices;

3. Wind erosion control practices; and

4. Non-storm water management and waste management and disposal control practices.

Specific objectives and minimum requirements for each category of control measures are contained in the Handbook.

The Contractor shall designate a Water Pollution Control Manager who will have the responsibilities outlined in the SWPPP.

The SWPPP shall include, but not be limited to, the following items as described in the SWPPP:

1. Source Identification;

2. Erosion and Sediment Controls;

3. Non-Storm Water Management;

4. Waste Management and Disposal;

5. Maintenance, Inspection and Repair;

6. Training;

7. List of Contractors and Subcontractors;

8. Post-Construction Storm Water Management;

9. Preparer;

10. Copy of the local permit;

11. BMP Consideration Checklist;

12. SWPPP Checklist;

13. Schedule of Values; and

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 183

14. Storm Water Pollution Prevention Drawings.

The Contractor shall amend the SWPPP, graphically and in narrative form, whenever there is a change in construction activities or operations which may affect the discharge of significant quantities of pollutants to surface waters, ground waters, municipal storm drain systems, or when deemed necessary by the Engineer. The SWPPP shall also be amended if it is in violation of any condition of the Permit or has not effectively achieved the objective of reducing pollutants in storm water discharges. Amendments s hall show additional control measures or revised operations, including those in areas not shown in the initially accepted SWPPP, which are required on the project to control water pollution effectively. Amendments to the SWPPP shall be submitted for review and acceptance by the Engineer in the same manner specified for the initially accepted SWPPP. Accepted amendments shall be dated and logged in the SWPPP. Upon acceptance of the amendment, the Contractor shall implement the additional control measures or r evised operations.

The Contractor shall keep a copy of the accepted SWPPP and accepted amendments at the project site. The SWPPP shall be made available upon request of a representative of the Regional Water Quality Control Board, State Water Resources Control Board, U.S. En vironmental Protection Agency or local storm water management agency. Requests by the public shall be directed to the Engineer.

By June 15 of each year, the Contractor shall submit an annual certification to the Engineer stating compliance with the requirements governing the Permit. If the project is in non-compliance at any time, the Contractor shall make a written report to the Engineer within 15 days of identification of non-compliance.

Add the following section:
300-13-1.2 Availability of SWPPP Template. For projects with a disturbance area of less than one acre, a template SWPPP document will be provided for the Contractor’s use. For projects with a disturbance area of one acre or more, a template SWPPP document may be obtained from the California Storm W ater Quality Association. The Contractor shall modify the template as necessary to reflect the Contractor’s construction operations and the site-specific conditions.

Add the following section:
300-13.1.3 Payment. Preparation, implementation and management of SWPPP shall be considered incidental to the items of work and no additional payment will be made therefor.

Add the following section:
300-13.1.4 SWPPP Implementation. Upon acceptance of the SWPPP, the Contractor shall be responsible throughout the duration of the project for installing, constructing, inspecting and maintaining the control measures included in the SWPPP and any amendments thereto and for removing and dis posing of temporary control measures. Unless otherwise directed by the Engineer or specified in these supplemental provisions, the Contractor’s responsibility for SWPPP implementation shall continue throughout any temporary suspension of work ordered in accordance with Section 6-3, “Suspension of Work". Requirements for installation, construction, inspection, maintenance, removal and disposal of control measures are specified in the “Handbook” and these supplemental provisions.

Soil stabilization practices and sediment control measures, including minimum requirements, shall be provided throughout the winter season, defined as between October 1 and April 30.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 184 Implementation of soil stabilization practices and sediment control measures for soil -disturbed areas of the project site shall be completed, except as provided for below, no later than 20 days prior to the beginning of the winter season or upon start of a pplicable construction activities for projects which begin either during or within 20 days of the winter season.

The Contractor shall implement, year -round and throughout the duration of the project, control measures included in the SWPPP for sediment tracking, wind erosion, non -storm water management and waste management and disposal.

The Engineer may order the suspension of construction operations, at the Contractor’s cost, which create water pollution if the Contractor fails to conform to the requirements of this section as determined by the Engineer.

Add the following section:
300-13.1.5 Maintenance. To ensure the proper implementation and functioning of control measures, the Contractor shall regularly inspect and maintain the construction site for the control measures identified in the SWPPP. The Contractor shall identify corrective actions and time frames to address any damaged measures or reinitiate any measures that have been discontinued.

The construction site inspection checklist provided in the “Handbook” shall be used to ensure that the necessary measures are being properly implemented, and to ensure that the control measures are functioning adequately. The Contractor shall submit one co py of each site inspection record to the Engineer, within two days of the inspection.

During the winter season, inspections of the construction site shall be conducted by the Contractor to identify deficient measures, as follows:

1. When the five-day rain probability forecast exceeds forty percent (40%).

2. After any precipitation which causes runoff capable of carrying sediment from the construction site;

3. At 24 hour intervals during extended precipitation events; and

4. Routinely, at a minimum of once every week.

If the Contractor or the Engineer identifies a deficiency in the deployment or functioning of an identified control measure, the deficiency shall be corrected by the Contractor immediately, or by a later date and time if requested by the Contractor and accepted by the Engineer in writing, but not later than the onset of subsequent precipitation events. The correction of deficiencies shall be at no additional cost to the City.

SECTION 301 – SUBGRADE PREPARATION, TREATED MATERIALS,

AND PLACEMENT OF BASE MATERIALS

301-1 SUBGRADE PREPARATION.
301-1.2 Preparation of Subgrade.

Modify the second and third paragraphs as follows:

Change each instance reading “150mm (6 inches)” to “300 mm (12”)”.

301-1.3 Relative Compaction.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 185 Delete the first paragraph and replace with the following:

The Contractor shall compact the upper 300 mm (12”) of subgrade beneath areas to be paved, have base or subbase material placed on them, or curb, gutter, curb and gutter, alley pavement, driveway or sidewalk constructed over them to no less than 95 percent maximum dry density as determined by ASTM test D-1557-91.

301-1.7 Payment.

Modify the first paragraph as follows:

Payment for subgrade preparation shall be included in the contract bid price for which the subgrade is prepared and shall include all labor, materials; including water, operations and equipment to scarify, adjust moisture, compact or recompact the subgrade, both in cut areas and in fill areas, and no further compensation will be allowed.

SECTION 302 - ROADWAY SURFACING

Add the following:
302-1 GENERAL.
302-1.1 Vegetation Treatment.

1. The Contractor shall treat all vegetation within the limits of the paved area to be surfaced with an herbicide that complies with the City’s Integrated Pest Management program. Herbicide shall be applied at least 2 Working Days prior to surfacing the street. Allowance for the 2-day period shall be shown in the schedule required per section 6 -1. Payment for pavement surfacing shall include tree trimming and herbicide treatment of the areas to be surfaced and no extra payment will be made for tree trimming and herbicide treatment.

302-1.2 Coordination.

1. The Contractor shall schedule the Work so as to prevent damage by all traffic. The Contractor shall not schedule Work so as to conflict with trash pickup. The trash hauling schedule can be obtained by calling Republic Services at (760) 332 -6464. At least 2 weeks prior to Work, Contractor shall send, by first class mail, notification letters to all property addresses within 500-feet of the Work. Obtaining the appropriate addresses shall be the Contractor’s responsibility. A sample letter may be provided by the Agency to be used as an example. The letter should provide the name of the Contractor and a 24 -hour phone number for residents to call if they have any issues or questions.

2. During operations, the Contractor’s schedule for resurfacing shall be designed to provide residents and business owners sufficient paved parking within an 800-foot distance from their homes or businesses.

3. Seventy-two hours prior to the start of any construction in the public right -of-way that affects vehicular traffic and/or parking or pedestrian routes, the Contractor shall give written notification of the impending disruption. For a full street closure, a ll residences and/or businesses on the affected street or alley shall be notified. For partial street closures, or curb, sidewalk and driveway repairs, the residences and/or businesses directly affected by the Work shall be notified.

4. The Contractor shall deliver the notification which shall state the date and time the Work will begin and its anticipated duration. The notification shall list 2 telephone numbers that may be called to obtain additional information. One number shall be the Contractor’s permanent office or field office and the other number shall be a 24-hour number answered by a representative of the Contractor who is knowledgeable about the Project. At least 1 of the phone numbers shall be in the (760) area code. An answeri ng machine shall not be connected to either

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 186 number. The notification shall also give a brief description of the Work and simple instructions to the home or business owner on what they need to do to facilitate the construction. The Contractor shall submit the contents of the notification to the Engin eer for approval. Notices shall not be distributed until approved by the Engineer.

5. For door hangers, the notification shall be pre-cut in a manner that enables it to be affixed to a doorknob without adhesives. It shall be a minimum size of 3-1/2 inches by 8-1/2 inches and shall be brightly colored with contrasting printing. The material shall be equivalent in strength and durability to 65 lb. card stock. The printing on the notice shall be no smaller than 12 point.

The precut notices shall be as shown on the example provided in Appendix “A,” with the day of the week circled and appropriate information specific to the Work inserted at the locations indicated in the italicized font.

6. The preparation, materials, printing, delivery and distribution of the letters, door hangers and notifications shall be included in the contract price Bid for Traffic Control and the Contractor will not be entitled to any additional compensation for printing and distributing these notices.

302-5 ASPHALT CONCRETE PAVEMENT.

Add the following:
302-5.8 Manholes and Other Structures.

1. When placing the overlay, the Contractor shall pave over appurtenances in the roadway which includes sanitary and storm access covers, water valve boxes, air vents, sewer dead end boxes and survey monument boxes. Each appurtenance shall be treated or cover ed to prevent adhesion of the overlay. Each appurtenance shall be located immediately after the overlay is placed and shall be thoroughly cleaned of any and all construction debris which may have entered due to the Contractor’s operation. The Contractor sh all adjust all CMWD water valve boxes per CMWD Standard Drawing No. W11 or CMWD Standard Drawing No.

W13. All City of Carlsbad sanitary sewer access covers shall be adjusted per CMWD Drawing No. S1. All storm sewer access covers shall be adjusted per SDRSD D-10. Riser rings or extensions shall not be used for the adjustment of these appurtenances.

2. Raising and adjusting to grade all City-owned or CMWD-owned appurtenances in the roadway shall be paid for at the Contract Unit Price per each as shown in the Bid. Such price shall constitute full compensation for all labor, materials, and equipment necessary for completing the Work as described in these Specifications and Plans. Other agencies will be responsible for their own appurtenances.

302-5.9 Measurement and Payment.

Add the following:

Payment for asphalt concrete shall be at the unit price bid per ton and shall constitute payment for cold milling, removal of grindings, surface preparation and placement of Asphalt Concrete. No additional payment shall be made for any tack coat or sand blotter.

302-8 SEALCOAT FOR MISCELLANEOUS AREAS.
302-8.2.1 General.

Delete the second paragraph and replace with the following:

1. Sealcoat material shall be diluted using clean, potable water in an amount not to exceed 20 percent of the total volume.

302-8.2.2. Spreading.

Delete the first paragraph and replace with the following:

1. Sealcoat shall be applied when the atmospheric temperature is greater than 55°F (13°C) and if rain is not forecast for the period of 24 hours after application; or as specified by the Engineer.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 187

Add the following section and subsections:
302-11 ASPHALT PAVEMENT REPAIRS AND REMEDIATION.
302-11.1 General. Asphalt pavement Repairs and Remediation shall consist of the repair and restoration of existing asphalt pavement. Repair of asphalt pavement shall consist of the saw cutting, removal and disposal of existing asphalt pavement in conformance with section 300-1.3, compaction of existing subgrade in conformance with section 301 -1, grading and compaction of base material in conformance with section 301 -2, application of grade SS-1h emulsified asphalt and the placement of asphalt concrete base and wearing courses as specified herein.

302-11.2 Full Depth Asphalt Concrete Patch. Full depth asphalt concrete patch shall consist of removing asphalt concrete and/or aggregate base/subgrade to 300 mm (1’) below existing asphalt surface and placing replacing the material so removed with asphalt concrete. The area shown on the plans or se t forth in the bid item are for estimating purposes only, final quantity will be as measured in the field. The Engineer will designate and mark the final limits of the asphalt patch area by outlining the area to be patched. The Contractor shall cut such areas to straight lines in square or rectangular areas as marked. The area so cut shall have two of the sides at right angles to the direction of traffic. The excavated faces of the base/subgrade shall be straight and vertical.

The Contractor shall compact the upper 300mm (1’) of subgrade to 95% relative compaction. A tack coat of SS-1h emulsified asphalt shall be applied uniformly to all asphalt to asphalt contact surfaces at a rate of 0.25 L/m 2 to 0.45 L/m2 (0.05 to 0.10gallons per square yard) in accordance with subsection 302-5.4, SSPWC. The Contractor shall fill and compact areas designated to be removed with 300 mm (1.0’) full depth asphalt concrete. Asphalt concrete for full depth asphalt concrete patch shall be B -AR-4000. The asphalt concrete so constructed shall have a finish surface and density conforming to subsection 302-5.6.2 SSPWC.

302-11.3 Crack Sealing . The Contractor shall wash, blow out and thoroughly dry all cracks designated to be sealed before installing hot poured rubber -asphalt joint sealant material. The sealant shall conform to the requirements of ASTM D1190. The Contractor shall dispose debris from crack cleaning outside the public way in accordance with Section 7-8.1, “Cleanup and Dust Control”. The hot-melt rubberized asphalt shall be melted in a jacketed, double boiler type melting unit. Temperature of the heat transfer medium shall not exceed 245°C (475°F). Application of the hot-melt sealant shall be made with a pressure feed applicator or po ur pot. Sealant shall be applied when the pavement surface temperature is greater than 4°C (40°F). Containers of hot - melt sealant shall be delivered to the jobsite in unopened containers that are clearly marked with data showing the manufacturer’s name, th e product designation and the manufacturer’s batch number and lot numbers. The level of the sealant shall be flush with the surface of the existing pavement. All excess sealant shall be removed from the crack with a minimum overlap onto adjacent pavement.

302-11.4. Measurement and Payment. Quantities of full depth asphalt concrete patch and crack sealing set forth in the bid item are for estimating purposes only, final quantity will be as designated and measured in the field. The Engineer will designate and mark the limits of the Full depth asphalt concrete patch and crack sealant application areas. Payment for resurfacing shall include post emergent herbicide treatment. Full compensation for conforming to the requirements of constructing full depth asphalt concrete patch shall include but not be limited to: furnishing all labor, tools, equipment, and materials necessary for doing the work including, saw cutting and removing and disposing 300 mm (1’) thick section of existing asphalt concrete, aggregate base/subbase and basement soil as designated by the engineer, placement of asphalt concrete, compaction of subbase and asphalt concrete, placement of SS-1h asphalt emulsion and all other work incidental to full depth asphalt concrete patch shall be considered as included in the contract

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 188 unit price bid for full depth asphalt concrete patch and no additional compensation will be allowed therefore. Full compensation for conforming to the requirements of crack sealing shall include but not be limited to, furnishing all labor, materials, tools, equipment, and incidentals necessary to do the work. Crack cleaning, roadway clean up, application of sealant, removal of excess sealant and all other work incidental to crack sealing shall be considered as included in the contract unit price bid and no additional compensation will be allowed therefor.

SECTION 303 CONCRETE AND MASONRY CONSTRUCTION

303-1 CONCRETE STRUCTURES

303-1.6.2 Falsework Design.

Add the following:

The Contractor shall provide all temporary bracing necessary to withstand all imposed loads during erection, construction, and removal of any falsework. The Contractor shall provide falsework drawings and calculations prepared by a registered professional engineer, civil or structural, that show provisions for resolution of all loads that may be imposed upon the falsework.

Such plans and calculations shall include:

1. Resolution of all live, dead, wind, construction and impact loads that may be imposed on the falsework.

2. Temporary bracing or methods to be used during each phase of erection and removal of the falsework.

3. Concrete placement sequence.

4. Erection and removal sequence.

5. Deflection values for the falsework that include recommended methods to compensate for falsework deflections, vertical alignment, and anticipated falsework deflection.

Falsework shall be designed, submitted, constructed, and removed in accordance with Caltrans Standard Specification Section 51.

303-1.11 Measurement.

Delete in its entirety and replace with the following:

Concrete structures will be measured for payment by each structure installed as specified in the bid schedule and in accordance with the plan and any referenced standard drawings.

303-1.12 Payment.

Delete in its entirety and replace with the following:

Payment for concrete structures will be made as set forth in the Bid Schedule. Payment shall include compensation for furnishing all labor, materials, tools, and equipment necessary to construct the concrete structures complete in place. Items shall includ e submittal of PCC mix design for approval, structure excavation, subgrade and base preparation, furnishing PCC and casting-in-place, steel reinforcement, forms, covers, rims, grates, frames, collars, cone and draft sections, bases, steps, clean up; and for all other work necessary to install the concrete structure, complete in place, and no additional compensation will be allowed therefor.

303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.
303-5.5.2 Curb.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 189 Add the following:

The Contractor shall stamp the curb face with 75 mm (3”) high block letters directly above the point that it is crossed by underground facilities with the marking specified in Table 303-5.5.2(A)

TABLE 303-5.5.2(A)
Curb Face Markings
Type of underground facilities Marking
Water Service Lateral W
Sewer Service Lateral S
Irrigation Water Lateral or Sleeve RW

303-5.9 Measurement and Payment.

Add the following:

Curb and gutter, and curb, shall be considered as continuing across driveways and access ramps when constructed adjacent thereto. Neither curb and gutter nor curb will be paid for across the length of local depressions, except that which occurs in gutter transitions at each side of an inlet.

SECTION 306 – OPEN TRENCH CONDUIT CONSTRUCTION

306-1 GENERAL
Trench drains shall be constructed at the locations and to the dimensions shown on the Plans and as directed by the Engineer. Work shall include forming, reinforcement, placement of concrete, installation of a monolithic asymmetrical U-channel with bottom slab reinforcement, cast-in-place or precast trench drain cover and frame, and all connections to existing weep holes, storm drains, and appurtenances.

Grated or slotted trench drain covers and frames shall be installed flush per the manufacturer’s recommendations. Acceptable product includes ZURN 7723-HDG frame and grate system with class c galvanized heel proof longitudinal ductile iron grate and vandal proof lockdown or approved equal. Grates shall be securely bolted to the frame. All grates installed within travel paths shall be ADA-compliant and traffic-rated as shown.

306-3 TRENCH EXCAVATION.

Add the following:
306-3.1 General. When the actual elevation or position of any existing pipe, conduit, or other underground appurtenances cannot be determined without excavation, the Contractor shall excavate and expose the existing improvement at the location shown on the Plans and any other locations deemed necessary by the Engineer. Such excavation shall be considered as part of the excavation necessary for the work. The Engineer shall be given the opportunity to inspect the existing improvements when it is exposed. Any adjustments in li ne or grade which may be necessary to accomplish the intent of the plans shall be made at no additional costs.

Add the following:
306-3.2 Removal of Surface Improvements.

Bituminous pavement, concrete pavement, curbs, sidewalks, or driveways removed in connection with construction shall be removed in accordance with Subsection 401 of the Standard Specifications and these Special Provisions and reconstructed in-kind.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 190

306-3.3. Removal and Abandonment of Existing Conduits and Structures.

Add the following:

Unless otherwise noted on plans, the Contractor shall remove all existing abandoned pipelines and conduits of any type, or use, and pipelines and conduits of any type, or use, that are abandoned during the course of the work and shall replace said pipeline s and conduits with properly compacted soils. Payment for removal and disposal of abandoned utilities shall be included in the lump-sum bid for Clearing and Grubbing, and no additional payment will be made.

306-3.5 Maximum Length of Open Trench.

Delete the first sentence for the first paragraph and replace with the following:

Except by permission of the Engineer, the maximum length of open trench where prefabricated pipe is used shall be the distance necessary to accommodate the amount of pipe installed in a single day.

306-6 BEDDING.
306-6.1 General.

Add the following:

All installation of, and bedding for recycled water, or potable water mains shall conform to Carlsbad Municipal Water District Rules and Regulations for the Construction of (Potable or Reclaimed) Water Mains, latest edition.

306-12 BACKFILL.
306-12.1 General.

Add the following:

The Contractor shall install detectable underground utility marking tape above each or, in the case of bundled underground conduit of the same type, the upper underground conduit being installed by the open trench method.

Delete the following section in its entirety and replace with the following:
306-12.3.2 Compaction Requirements . The Contractor shall densify trench backfill to a minimum of 90 percent relative compaction except that in the top 915 mm (36”) of the street right- of-way, compaction shall be 95 percent.

306-13 TRENCH RESURFACING.
306-13.1 Temporary Resurfacing.

Add the following:

Temporary bituminous resurfacing materials which are placed by the Contractor are for its convenience and shall be at no cost to the Agency. Temporary bituminous resurfacing materials shall be used in lieu of permanent resurfacing only when approved by the Engineer. When temporary bituminous resurfacing materials are used in lieu of permanent resurfacing it shall be removed and replaced with permanent resurfacing within 7 days of placement. No additional payment will be made for temporary bituminous resurfa cing materials. The price bid for the associated conduit or structure shall include full compensation for furnishing, placing, maintaining, removing, and disposing of such temporary resurfacing materials.

306-13.2 Permanent Resurfacing.

Add the following:

Except as provided in section 306 -13.1, “Temporary Resurfacing,” the Contractor shall perform permanent trench resurfacing within 24 hours after the completion of backfill and compaction of backfill and aggregate base materials.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 191

306-14 MEASUREMENT
306-14.10 Trench Drain
Trench Drain shall be measured by the linear foot, measured algon the flow line of the drain, complete in place. Measurement includes all components: concrete channel, reinforcement, grates, frame, transition to existing curb and gutter, and surface restoration.

306-15 PAYMENT.
306-15.1 General.

Add the following:

Payment for utilities undergrounding which includes the utility trench for CATV and SDGE and conduit for SDGE’s electric conversion shall be made on the basis of contract lump sum price for utilities undergrounding and no other payments will be made. Cox Cable will supply and deliver conduits and fittings to be installed by the Contractor. Cox Cable will install enclosures. The Contractor will furnish and install 6.4 mm (¼”) nylon pull ropes in all conduit.

ADD the following section:
306-15.10 Trench Drain
Payment for “FURNISH AND INSTALL TRENCH DRAIN AND U-CHANNEL” shall be made at the Contract Unit Price shown on the Bid Schedule, and shall include full compensation for furnishing all labor, materials, tools, equipment, formwork, reinforcement, concrete placement, trench drain grate and frame, reconnection to existi ng drainage, and incidentals necessary to complete the trench drain in accordance with the Plans and these Special Provisions, and as directed by the Engineer and there shall be no additional costs to the City.

SECTION 308 – MICROTUNNELING

308-6 SUBSURFACE CONDITIONS.
308-6.2 Microtunneling Requested by the Contractor.

Delete in its entirety and replace with the following:

1. When microtunneling is proposed by the Contractor as an alternative to the specified methods of conduit installation, the Contractor shall obtain copies of the information and reports listed in 3-9 and 308-6.3 and shall conduct independent investigations as necessary to substantiate the basis for the Contractor’s proposal and submit in accordance with 3 -8. Microtunneling operations must be approved by the Engineer prior to the start of microtunneling work.

SECTION 310 - PAINTING

Add the following Section:
310-6 PERMANENT SIGNING
310-6.1 General. The Contractor shall provide and install all permanent traffic control signs at locations shown on plans and as specified herein.

Add the following section:
310-6.2 Measurement And Payment. Permanent signing and appurtenances thereto shown on the plans or required in the specifications are a part of the lump-sum item for permanent signing and payment therefore shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in supplying and installing

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 192 permanent signing and appurtenances, complete in place, as shown on the plans, as specified in the Standard Specification and these special provisions, and as directed by the Engineer.

SECTION 314 – TRAFFIC STRIPING, CURB AND PAVEMENT

MARKINGS, AND PAVEMENT MARKERS

314-2 REMOVAL OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS. 314-2.1 General.

Delete in its entirety and replace with the following:

1. The Contractor shall remove by wet grinding all existing or temporary traffic markings and lines that may confuse the public. When temporary detour striping or markings are no longer required, they shall be removed prior to painting the new traffic stripes or markings.

2. The Contractor shall remove all existing markings and striping, either permanent or temporary, which are to be abandoned, obliterated or that conflict with the Plans by wet grinding methods.

Removal of striping by high velocity water jet may be permitted when there is neither potential of the water and detritus from the high velocity water jetting to damage vehicles or private property nor to flow from the street into any storm drain or water course and when approved by the Engineer.

3. The Contractor shall vacuum all water and detritus resulting from high velocity water jet striping removal from the pavement immediately after the water jetting and shall not allow such materials to flow in the gutter, enter the storm drain system or to le ave the pavement surface. Surface variation limitations for high velocity water jet striping removal shall be the same as for grinding.

4. The Contractor shall not use dry or wet sandblasting in any areas. Alternate methods of paint removal require prior approval of the Engineer. Obliteration of traffic striping with black paint, light emulsion oil or any other masking method other than a min imum 30mm (0.10’) thick asphalt concrete overlay is not permitted.

314-2.2 and 314-2.3
Replace as follows:
314-2.2 Measurement and Payment.

1. Removal of traffic striping and curb and pavement markings as shown on the Plans and required by the Specifications shall be included in the lump -sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, theref ore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping.

314-3 REMOVAL OF PAVEMENT MARKERS.
314-3.2 and 314-3.3
Replace as follows:
314-3.2 Measurement and Payment

1. Removal of pavement markers as shown on the Plans and required by the Specifications shall be included in the lump-sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 193 for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping.

314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS. 314-4.3.6 and 314-4.3.7
Replace as follows:
314-4.3.6 Measurement and Payment

1. Final and temporary traffic striping, curb markings and pavement markings as shown on the Plans and required by the Specifications shall be included in the lump -sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore.

Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, an d incidentals for doing all Work in installing the final and temporary traffic striping.

314-4.4.5 and 314-4.4.6
Replace as follows:
314-4.4.5 Measurement and Payment.

1. Thermoplastic traffic striping and pavement markings as shown on the Plans and required by the Specifications shall be included in the lump -sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. R eapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping.

314-5 PAVEMENT MARKERS.
314-5.6 and 314-5.7
Replace as follows:
314-5.6 Measurement and Payment.

1. Pavement markers as shown on the Plans and required by the Specifications shall be included in the lump -sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes an d markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 194

SUPPLEMENTAL PROVISIONS
TO

STANDARD SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION

PART 4, EXISTING IMPROVEMENTS

SECTION 400 – PROTECTION AND RESTORATION

400-2 PERMANENT SURVEY MARKERS.

Add the following:

1. The Contractor shall not cover or disturb permanent survey monuments or benchmarks without the consent of the Engineer. Where the Engineer concurs, in writing, with the Contractor that protecting an existing monument in place is impractical, the Contractor shall employ a licensed land surveyor or a registered civil engineer authorized to practice land surveying within the State of California (“Surveyor”) to establish the location of the monument before it is disturbed. The Contractor shall have the monument replaced by the Surveyor no later than 30 Calendar Days after construction at the site of the replacement is completed.

The Surveyor shall file corner record(s) as required by Business and Professions Code Sections 8772 and 8773 et seq.

2. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, the Contractor shall adjust the monument frame and cover to the new grade within 7 Calendar Days of paving unless the Engineer s hall approve otherwise. Monument frames and covers shall be protected during street sealing or painting projects or be cleaned to the satisfaction of the Engineer.

SECTION 401 – REMOVAL

401-2 ASPHALT CONCRETE PAVEMENT.

Delete in its entirety and replace with the following:

1. Asphalt concrete pavement shall be removed to clean, straight lines. Removal performed by cold milling shall conform to 404. Adjacent AC/AB sawcut and removal associated with concrete construction shall be full depth and a minimum width of 12 inches from f ace of concrete edge and continue along the concrete scheduled for removal. Removal and disposal of adjoining AC/AB section shall be incidental to the removal of concrete structure Bid item per this Section. Replacement of adjoining AC/AB section shall be incidental to replacement of the concrete.

401-3 CONCRETE AND MASONRY IMPROVEMENTS.
401-3.2 Concrete Curb, Walk, Gutters, Cross Gutters, Curb Ramps, Driveway and Alley Intersections.

Delete in its entirety and replace with the following:

1. Concrete shall be removed to neatly sawed edges with saw cuts made through the entire thickness. Concrete sidewalk or driveway to be removed shall be neatly sawed in straight lines either parallel to the curb or at right angles to the alignment of the sidewalk. No section to be replaced shall be smaller than 30 inches (750 mm) in either length or width.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 195

All existing concrete shall be removed to the nearest joint. Concrete shall be removed to neatly sawed edges with saw cuts made to a depth deep enough to produce a clean straight break without loosening, cracking or damaging adjoining improvements. Curb an d gutter shall be sawed on a neat line at right angles to the curb face. PCC and all other material unsuitable for use as fill, as determined by the Engineer, shall be removed from the right -of-way and disposed of by the Contractor at a site of his own cho ice and shall pay all costs incidental to the disposal.

Add the following:
401-3.2.1 Adjacent Asphalt Concrete (AC/AB) Sawcut and Removal.

1. Adjacent AC/AB sawcut and removal associated with concrete construction shall be full depth and a minimum width of 12 inches from face of concrete edge and continue along the concrete scheduled for removal. Removal and disposal of adjoining AC/AB section s hall be incidental to the removal of concrete structure Bid item per this Section. Replacement of adjoining AC/AB section shall be incidental to replacement of the concrete as specified in Section 303-5.

SECTION 402 – UTILITIES

402-1 LOCATION.
402-1.1 General.

Delete the first paragraph and replace with the following:

1. Known utilities and their respective owners are shown on the Plans or specified in the Special Provisions and their locations are based on available records. The accuracy and/or completeness of the utilities shown on the Plans is not guaranteed and actual locations must be confirmed by potholing. Where underground utilities are shown on the Plans, the Contractor shall assume every property parcel will be served by a service connection for each type of utility.

Insert the following after the first sentence of the third paragraph:

Subsurface installations shall be located at least 5 Working Days and at least 500 feet in advance of any construction heading and the results reported in written form to the Engineer.

Amend paragraph d) to read as follows:
d) horizontal location with reference to Project stationing.

402-2 PROTECTION.

Delete the first 3 paragraphs and replace with the following:

1. The Contractor shall not interrupt the service function or disturb the support of any utility without authority from the utility owner or direction from the Engineer. Valves, switches, vaults, and meters shall be maintained readily accessible for emergency shutoff. Excavation of soils providing support to pressure pipeline thrust blocks may require isolation and de - pressurization of the pipeline prior to the installation of support devices and the Contractor shall coordinate such Work with the utility owner.

2. Where a vertical separation distance of 12 inches cannot be attained between a proposed utility and an existing utility greater than 4 inches in diameter, place a 1 -inch thick neoprene or silicone pad with Shore A durometer hardness of 50 to 70 (ASTM D2240 ) in contact with the top of the lower utility and backfill with Portland cement concrete sand conforming to 203-

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 196

1.5.5 to 3 inches above the bottom of the upper utility. The width of the pad shall be equal to the width of the trench and the length shall extend 1 foot beyond the outer limits of the existing utility.

3. Where protection is required to ensure support of utilities located as shown on the Plans or in accordance with 402-1, the Contractor shall, unless otherwise specified, furnish and place the necessary protection at its expense.

4. Upon learning of the existence and location of any utility omitted from the Plans, the Contractor shall immediately notify the Engineer in writing. When authorized by the Engineer, support or protection of the utility will be paid for as provided in 7-3 or 7-4.

402-4 RELOCATION.

Delete paragraphs 3 and 4 and replace with the following:

1. When the Plans or Special Provisions provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such Work, including temporary utility service, shall be included in the Bid for the items of Work necessitating such Work. Temporar y or permanent relocation or alteration of utilities requested by the Contractor for its convenience shall be its responsibility and it shall make all arrangements and bear all costs.

2. The Contractor will relocate service connections as necessary within the limits of the Work or within temporary construction or slope easements in accordance with the procedures and upon the approval of the utility owner. When directed by the Engineer, the Contractor shall arrange for the relocation of service connections as necessary between the meter and property line, or between a meter and the limits of temporary construction or slope easements.

Payment for the relocation of such service connections shall be in accordance with 7-3 unless otherwise specified in the Bid. Payment will include disconnection of existing service connections from the utility main, capping or plugging existing outlets on the utility main, abandoning the service connection, and t he restoration of all existing improvements which may be affected by the service connection relocation. The Contractor may agree with the owner of any utility to disconnect and reconnect private interfering service connections.

Unless otherwise specified in the Bid, disconnection and reconnection of private services will be outside of the scope of the Work and the Agency will not be involved in any such agreement.

402-5 DELAYS DUE TO UTILITY CONFLICTS.

Delete paragraphs 1 through 4 and replace with the following:

1. The Contractor shall notify the Engineer of its Construction Schedule insofar as it affects the protection, removal, or relocation of utilities. The notification shall be included as a part of the Construction Schedule in accordance with 6-1 which shall be revised upon the completion of utility potholing and evaluation for potential utility conflicts. The Contractor shall notify the Engineer in writing of any subsequent changes in the Construction Schedule which will affect the time available for protection, removal, or relocation of utilities.

2. The Contractor will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, noted, and completed in accordance with 402-1.

3. The Contractor may be given an extension of time for unforeseen delays attributable to unreasonably protracted interference by utilities in performing Work correctly shown on the Plans.

4. The Agency will determine the scope of Work for the removal, relocation, or protection of existing main or trunk line utility facilities within the area affected by the Work if such utilities are not identified in the Contract Documents. The Contractor wil l not be assessed liquidated damages for any delay caused by the removal, relocation, or protection of such existing facilities.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 197

402-6 COOPERATION.

Delete in its entirety and replace with the following:

1. When necessary, the Contractor shall so conduct its operations as to permit access to the Work Site by the Agency or the utility owner and provide time for utility Work to be accomplished during the progress of the Work.

SECTION 403 - MANHOLE ADJUSTMENT AND RECONSTRUCTION

403-1 GENERAL.

Delete in its entirety and replace with the following:

1. Wet utility (water, recycled water, sewer and storm drain) manhole and vault frames and covers and valve box frames and covers within an area to be paved or graded shall be set to finish grade by the Contractor.

2. The Contractor shall remove all debris from the interior of manholes and vaults and shall clean all foreign material from the top of the frames and covers.

403-3 MANHOLES IN ASPHALT CONCRETE PAVEMENT.

Delete in its entirety and replace with the following:

1. Wet utility structures extending 2 inches (50 mm) or more above the new subgrade shall be lowered by the Contractor to the new subgrade before construction of the pavement section.

Other structures shall be lowered by their owners unless otherwise specified or shown on the Plans. Structures projecting less than 2 inches (50 mm) above the subgrade may be surveyed and covered for construction of the pavement section and later adjusted to grade. The top of reset manholes and other structures shall conform to t he smoothness requirement specified in 302-5.6.2.

2. All structures from which manhole frames and covers have been removed to facilitate pavement section construction shall be temporarily covered with a steel plate by the Contractor. When this procedure is impractical, such as for large vaults, or special structures, remodeling or reconstruction shall be completed to finish permanent surface prior to paving operations.

3. The Contractor shall notify utility owners at least 21 Calendar Days in advance of the need to commence Work required prior to paving operations and again for Work required after paving operations. If the Engineer determines the utility owner will not comp lete adjustment of its facilities within 10 Working Days of the completion of the surface course of pavement, the facilities will be adjusted by their owner under a separate procedure established by the Agency.

4. After the pavement has been completed, the necessary portions of the subgrade, base, and pavement shall be neatly removed, the structure built up, and the manhole or vault frame or valve box set to within 1 -1/2 inches (37.5 mm) of finish pavement surface w ith concrete pavement conforming to 201-1 and 302-6. The Contractor shall fill the remaining 1-1/2 inches (37.5 mm) with the asphalt concrete surface course mixture. This material shall be placed and compacted to conform to the appearance, grade, density and smoothness of the surrounding pavement.

403-4 MEASUREMENT.

Delete in its entirety and replace with the following:

1. Manhole, vault or valve box adjustment and reconstruction of the type specified will be measured by each.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 198

403-5 PAYMENT.

Delete in its entirety and replace with the following:

1. Payment for adjusting manhole or vault frames and covers to grade, where the difference between the lowest point of manhole or vault frame removal and final elevation of the top of the frame is less than 15 inches (375 mm) or where the adjustment is accomp lished by adjustment rings only, will be made at the Contract Unit Price for adjusting each manhole or vault frame.

2. Payment for setting manhole or vault frames and covers to grade, where the difference between the lowest point of manhole or vault frame removal and the final elevation of the top of the frame is 15 inches (375 mm) or more, will be made at the Contract Uni t Price for reconstructing each manhole.

3. Payment for adjusting valve boxes to grade will be made at the Contract Unit Price for adjusting each valve box regardless of the height of the adjustment.

SECTION 404 – COLD MILLING

404-12 PAYMENT.

Add the following:

No extra payment will be made for milling or disposing of geotextile, geogrid, or pavement fabric.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 199

SUPPLEMENTAL PROVISIONS
TO

STANDARD SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION

PART 7, STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS

Section 700 – Materials

Modify as follows:

Section 86, “ Electrical Work ”, of the Caltrans Standard Specifications replaces Section 700, “Materials”, and Section 701, “Construction” of the SSPWC, in all matters pertaining to the specifications for measurement, payment.

Modify Section 86 as follows:

86-2 MATERIALS AND INSTALLATION.

Replace Section 86-2.02 with the following:
86-2.02 Removing and Replacing Improvements. In addition to the requirements of sections 400, “Protection and Restoration of Existing Improvements” and 306 -1.5, “Trench Resurfacing”, improvements such as sidewalks, curbs, gutters, portland cement concrete and asphalt concrete pavement, underlying material, lawns and plants, and any other improvements removed, broken or damaged by the Contractor’s operations, shall be replaced or reconstructed with the same kind of material as found on the work or with materials of equal quality. The new work shall be left in a serviceable condition.

Whenever a part of a square or slab of existing concrete sidewalk, curb, gutter, or driveway is broken or damaged, the entire square, section or slab shall be removed and the concrete reconstructed as above specified. The outline of all areas to be removed in portland cement concrete sidewalks and driveways and in pavements shall be cut to a minimum depth of 0.17 foot (2”) with an abrasive type saw prior to removing the sidewalk, driveways and pavement material.

Cuts shall be neat and true along score lines, with no shatter outside the removal area.

Replace Section 86-2.05B with the following:
86-2.05B Use. Exposed conduit installed on a painted structure shall be painted the same color as the structure. Unless otherwise indicated, the minimum metric trade size of conduit shall be:
1) From an electrolier to the adjacent pull box shall be Size 41 (11/2” dia). 2) From a pedestrian push button post to the adjacent pull box shall be Size 27 (1” dia). 3) From a signal standard to the adjacent pull box shall be Size 53 (2” dia). 4) From a controller cabinet to the adjacent pull box shall be Size 78 (3” dia). 5) For detector runs shall be Size 78 (3” dia).
6) Not otherwise specified shall be Size 78 (3” dia).

Add the following:
86-2.09B Installation. All conductors shall be pulled directly from the spool into the conduit and shall not be dragged on the ground as to cause damage to the conductors.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 200 86-6 LIGHTING.

Replace Section 86-6.01 with the following:
86-6.01 Luminaires for Street Lighting.

Luminaires:

A. Luminaires shall be LED and cobra head style.

B. Luminaires shall be a minimum 9,600 lumens.

C. Luminaires shall be Type III Distribution as defined by the Illuminating Engineering Society of North America (IESNA).

D. Luminaires shall be full-cutoff so that light is not projected above the horizontal plane of the fixture.

E. Luminaires on non -local residential streets shall have a maximum Correlated Color Temperature (CCT) of 4000K.

F. Luminaires on local residential streets shall have a maximum CCT of 3000K.

G. Luminaires shall have an ANSI C136.41 compliant NEMA 7 pin receptacle for use with photo controls and smart lighting applications.

Street Light Standard:

Street Light pole shall be Ameron Contemporary Series 2B2 Round Pole or approved equivalent with the following parameters:
a. Street Light poles shall be round, pre-stressed concrete utilizing an anchor base. The surface treatment shall be exposed concrete aggregate with a graffiti-resistant coating. b. Street Light foundations shall be in accordance with San Diego Regional Standard Drawing (SDRSD) E -01 and E -02 for standard concrete poles with no additional mounted appurtenances. If equipment or additional appurtenances are to be mounted, the street light pole shall be steel with an exposed concrete aggregate finish and the foundation shall be specifically designed and stamped by a licensed civil or structural engineer.
c. Street light poles in arterial or commercial areas shall have a height of 26 feet. d. Street light poles in residential areas shall have a height of 24 feet. e. Mast arms shall be aluminum or galvanized steel with a length of 8 feet. f. Luminaire mounting height shall be between 1.5’ and 2.5’ from the top of pole.

Add the following:
86-6.07 Photoelectric Controls. Type IV photoelectric control shall be used unless otherwise shown on the plans or required by these special provisions and shall be installed in a receptacle integral with the luminaire.

86-6.08 Landscape Lighting.

Wall Wash Lighting and Up Lighting:

Wall wash light shall be Targetti Keplero Mini High Efficacy, or approved equal. Lighting shall be LED, round, flush to grade, and be capable of dimming. Light fixture shall be suitable for marine- grade environments.

Up lights shall be FXLuminaire, QZ LED Up Lights or approved equal. Lighting shall be LED, be capable of zoning and dimming, and provide a Useful LED Life of L70 or higher . The up light fixtures shall be oriented towards the center of the traffic circle such that it does not illuminate the roadway. Aim the fixture a minimum of 10º from the vertical to allow dirt and water run-off to drain from the lens. Light fixture shall be suitable for marine-grade environments.

The fixtures shall be encased with a concrete footing as specified in the plans or as approved by the City. Fixtures shall be installed in a well -drained area not subject to standing water. Lighting

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 201 cables shall have a waterproof connection, leaving a minimum of 18 inches of slack below each fixture.

The fixtures shall be by compatible with the lighting transformer controller if a low-voltage fixture is selected. It is the Contractors responsibility to confirm that the fixture is compatible with the transformer prior to ordering and installation.

Lighting fixtures shall be installed as specified in these Special Provisions and per manufacturer’s recommendations. If conflicting installation instructions are provided between the manufacturer’s installation guidelines and these Special Provisions, th e manufacturers guidelines shall take precedence and as approved by the City.

Lighting Transformer Controller:

Lighting controller shall be compatible with the Targetti, FXLuminaire, DX Controller or approved equal. Controller shall provide step -down transformer for low -voltage system of landscape lighting. Controller shall be capable of providing lighting, zoning, and dimming control. The Contractor shall confirm the cont roller is compatible with proposed landscape lighting prior to ordering and installation. Controller shall have an ambient operating temperature rating of 0ºF to +140ºF.

Controller shall be installed in the upright position on a vertical surface placed in a NEMA 3R cabinet equipped with a lock box. The cabinet be installed in a location that is not subject to water from irrigation, ponding, and tampering.

Controller shall be installed as specified in these Special Provisions and per manufacturer’s recommendations. If conflicting installation instructions are provided between the manufacturer’s installation guidelines and these Special Provisions, the manufa cturers guidelines shall take precedence and as approved by the City.

The Contractor shall provide voltage drop calculations to the City prior to ordering of material. If the Contractor elects not to use a low voltage system, a new service request with SDGE may be required and as approved by the City, warranty, materials and methods of construction of street lighting and traffic signals.

Certification and Warranty:

Manufacturer shall provide a 5 -Year Limited Warrant y on the landscape light fixtures, with the exception of the transformer controller which shall be covered by a 10-Year Warranty.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 202 ADD the following Section:
86-2.0 RECTANGULAR FLASHING BEACON (RRFB) ASSEMBLY SYSTEM

86-2.01 General

The Contractor shall manufacture, deliver, install, test, and modify electrical and RRFB systems as shown on the Plans and specified in these Special Provisions.

Unless otherwise indicated in these Special Provisions, all materials, equipment, design, manufacturing methods, installation, testing, and workmanship shall conform to or exceed all regulations and codes indicated in Section 86 1.01D, “Quality Assurance,” of the Caltrans Revised Standard Specifications, and the latest revisions of the regulations, codes and standards indicated herein. The Contractor shall submit documentation indicating that the materials and equipment furnished conform to such standards and requirements.

The Contractor's Work shall conform in all respects to applicable industry standards and sound engineering practice.

The manufacturer's printed or verbal recommended installation procedures and instructions for all materials furnished by the Contractor under this contract shall be followed explicitly, unless otherwise directed by the Engineer. The Contractor shall submit the manufacturer’s recommended installation and maintenance procedures to the Engineer for approval prior to the start of construction. If the manufacturer's recommended installation procedures or instructions differ from those shown on the Plans or speci fied herein, then the Contractor shall submit a request for information to the Engineer that details the discrepancy and requests direction prior to proceeding with the Work.

The Contractor shall perform all necessary Work including, but not limited to, field surveying, blowing out conduits, installing pull ropes, identifying conduits and conduit runs, reviewing pull box sizing and existing conduit bend radius, determining cond uit fill, and locating the route and length of new conduit to be installed as shown on the Plans.

The Contractor shall locate all existing utility facilities in the areas in which the Contractor will be digging. The Contractor shall facilitate a site meeting with the City a minimum of 48 hours (2 business days) in advance of marking out the existing facilities. The Contractor shall open existing pull boxes and vaults as needed and locate the existing conduits and facilities. The Contractor shall have had prior experience marking out SDG&E, City, and other utility facilities prior to construction. The Co ntractor shall pothole and protect in place existing conduits, pull boxes, cables, and equipment.

The Contractor shall protect in place all existing utility facilities, unless otherwise directed on the Plans or in these Special Provisions.

The Contractor shall verify through field investigation the feasibility of installing the system in conformance with the Plans, these Special Provisions and Standard Specifications, prior to ordering material and beginning construction.

86-2.02 RRFB System

RRFB crossings are proposed at the following intersections:
• Oak Avenue and Harding Street
• Pine Avenue and Madison Street

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 203 • Walnut Avenue and Madison Street
• Walnut Avenue and Roosevelt Street
• Palm Avenue and Harding Street

The Contractor shall furnish and install a new Rectangular Rapid Flashing Beacon (RRFB) system at the locations identified on the Plans. The RRFB system shall consist of manufacturer-supplied components for a solar powered , RRFB warning system. The RFFB system installation shall include the following components:
• Top mounted solar panel
• Controller enclosure
• W11-2 signs (back to back)
• W16-7P plaques (back to back)
• Bi-directional RRFB light bar or, unless otherwise indicated on the plans, a uni-directional RRFB light bar
• Pedestrian push button w/ double-sided R10-25 sign
• Pole Package

RRFB system shall be by Carmanah, model number R920-MX, or approved equal. The RRFB’s will be solar powered. The signs and light bars shall be double sided, unless otherwise indicated on the plans. The warning signs and light bars shall face the direction of oncoming traffic intended to alert when activated. Light bars shall be self-contained and pedestrian push button activated, and shall be attached with a jaw mount, strap and saddle method, or per manufacturer’s recommendations. Once the lights are act ivated, they shall all operate on the same Radio Frequency. The RRFB system shall be fully compliant with all FHWA and CA-MUTCD guidelines.

Light Bars

The light bars shall be current-driven LED strings without active electronics. The LEDs shall be driven by pulse-width modulated fixed current.

The light bar housing shall be constructed from aluminum and shall have the approximate dimensions: 24” L x 1.5” D x 4.5” H (61.0 cm L x 3.8 cm D x 11.4 cm H).

Each light bar shall conform to all provisions of the MUTCD and FHWA requirements.

Each of the two modules in a light bar shall have 8 LEDs and shall be purpose -built by the manufacturer of the RRFB including the optics.

Each end of a light bar shall include a side -emitting pedestrian confirmation light composed of a single LED. Users shall have the option of using both confirmation lights for median applications, or covering one confirmation light with an included sticker for side-of-road applications.

The light bar shall be mounted to the post or pole using a separate bracket assembly to facilitate mounting two light bars back -to-back (bi -directional) and to allow the light bar(s) to rotate horizontally for aiming.

The light bar bracket shall be constructed from galvanized or stainless steel and shall have both banding and bolting mounting options and shall be able to be mounted to all specified pole types.

The light bar assembly shall open for access to the wiring connections for the LED modules. LED modules shall be rated to NEMA 3R.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 204 Mounting

Mounting adapter hardware for the RRFB shall be available for the following configurations:

• 2” / 2.5” Perforated Square Pole Mount

• 2 3/8” - 2 7/8” Diameter Round Post Mount

• 4” - 4.5” Diameter Round Post Mount

• Side-of-Pole Mount

• Wooden Pole

Mounting configurations shall not require specialized tools.

Controller

The controller shall be self-contained in the solar panel or may be in a lock box with hinged door and vandal resistant. The lock box shall attach to the pole via strap and saddle method. The controller shall be able to adjust the brightness of the light bars as outside lighting levels change between day and night, being brighter during the day and less bright at night.

The solar engine shall house an auto-scrolling LED on-board user interface that provides on-site configuration adjustment, system status and fault notification.

The user interface shall provide a display of four (4) alphanumeric characters and three (3) control buttons to navigate and change settings and activate functions.

When editing the configuration, the user interface will flash the display indicating it is ready to accept editing and will flash the display rapidly 3 times to indicate the setting change has been accepted.

The flash duration shall be adjustable in-the-field from 5 to 60 seconds in one second increments, 60 to 1,200 seconds in 60-second steps, and 3,600 seconds. Default flash duration shall be 20 seconds.

The system shall provide configurable nighttime intensity settings ranging from 10% to 100% of daytime intensity.

The system shall be capable of enabling or disabling ambient brightness auto -adjustment. This feature allows the system to provide optimal output brightness in relation to ambient light levels while always maintaining adherence to SAE J595 Class I specifications. If enabled, the ambient brightness auto-adjustment shall adjust output to a range between 50% and 100% of daytime intensity.

The User Interface shall provide viewing and/or programming access for the following:

• Activation Duration (5 to 60, 60 to 1200, or 3600 seconds) • Digital output that is active during the flashing cycle that allows the control of external devices such as crosswalk illumination. Digital output shall be configurable for night operation only or operation day or night • Radio Channel (Choice of 1 to 14)

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 205 • Radio Status
• Night Intensity Setting
• Adjustment for Ambient Daytime Brightness
• Self-Test / BIST (Built-In Self-Test) including the detection of shorts or open circuits in the fixture outputs
• Battery Status – General description and actual battery voltage • Day or Night Status (as determined by dedicated photosensor not solar panel output)
• Solar Panel Voltage
• Automatic Light Control. If this safety feature is enabled, it allows the RRFB to temporarily reduce the intensity of the light bars to maintain energy equilibrium.

The user interface shall report the amount of dimming being applied in the range of 10% to 100%
• Daily activations averaged over 90 days
• Pushbutton detection
• Firmware Version number

Activation duration, Night intensity setting and adjustment for ambient daytime brightness shall be automatically broadcast to all RRFBs in the system when changed in one RRFB.

Solar Panel System

The solar panel shall be installed such that there are no direct obstructions to the sun’s path.

Contractor shall contact the manufacturer to provide recommended orientation of the solar panels.

The recommended orientation made by the manufacturer shall be submitted to the Engineer for approval prior to installation. The orientation and angle of each solar panel may vary depending on the placement of each pole in order to optimize the performance of each pole.

Battery System

The solar engine shall house two 7 amp-hour 12V nominal sealed valve-regulated AGM lead-acid maintenance-free batteries. Each battery shall be equipped with a 1.5 amp fast-blow barrel fuse on the positive lead.

The battery charging system shall be 3 -stage and incorporate temperature -compensation to prevent battery overcharging in hot weather.

Batteries, in conjunction with recommended RRFB performance, shall be designed for a demonstrable service life of 5 years.

The battery shall be rated for -40˚ to 140˚F (-40˚ to 60˚C).

Batteries shall have quick connections to facilitate installation and be readily available from multiple suppliers and non-proprietary.

Batteries shall be supported by rubber bumpers and be secured in place with straps.

Operational Specifications

The RRFB shall meet the minimum photometric specifications of the Society of Automotive Engineers (SAE) standard J595 Class I dated January 2005. A photometric report by a certified third-party testing laboratory shall be provided to demonstrate compliance with J595.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 206 The color of the yellow light bar indications shall meet the specifications of SAE standard J578 (Color Specification) dated December 2006.

The solar engine shall have the capacity to provide 300 20-second activations per day year-round using the applicable peak sun hours insolation available at the installation location. Refer to Section 8. Solar Simulations for details on insolation data sources.

The controller shall be able to support up to 1.4 amps combined current through the RRFB fixtures simultaneously.

The system shall use a dedicated light sensor to detect night and day states and apply any optionally-enabled intensity adjustments.

Radio System

The radio system shall operate at 2.4GHz

Upon detection of a pushbutton press, an RRFB will broadcast an activation to all other nearby RRFBs sharing the same channel.

The RRFB shall have the capability to activate other RRFBs by wireless communications within 1,000 feet (304 meters).

The RRFB shall have a minimum of 14 unique channels that can be configured on -site to avoid inadvertent activation of nearby systems.

The antenna shall be a low-profile “button” shape that cannot be bent or broken by vandals.

Pedestrian Push Button
The pedestrian push button for the RRFB shall be Polara Bulldog Push Button, or approved equal.

The push button shall be ADA compliant. The push button shall be accompanied by a R10 -25 (9”x12”) sign, “Push Button to Turn on Warning Lights” and installed per plan.

Signs

Warning signs supplementing the RRFB system shall be per Plan and standard size. Signs shall be mounted using the strap and saddle method or as shown on the Plans. Unless specified here- in, signs and mounting shall meet requirements specified in the State Standard Specifications and section “Traffic Signs” of these Special Provisions.

Pole Package

The RRFB system shall comprise of a pole package consisting of two pole assemblies. Poles shall be Tapco (product number 373-15) or approved equal, Schedule 40, 4.5” OD with anchor J- bolts, nuts, washers, and pedestal base.

Pole Foundations

Pole foundations for new or relocated and salvaged poles shall meet requirements specified in the Caltrans Standard Specifications and subsection “Foundations” under section “Traffic Signal Improvements” of these Special Provisions.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 207 The Contractor shall set up an on -site training session with a certified representative from the manufacturer and a representative from the City to go over the installation, programming, testing, adjusting, calibrating, and maintaining of the assembly. The Contractor shall furnish all materials and equipment necessary for the training and notify the Engineer at least ten (10) working days prior the desired training date.

Certification and Warranty:

The RRFB shall be FCC certified to comply with all 47 CFR FCC Part 15 Subpart B Emission requirements.

The RRFB shall be manufactured in the USA and shall be Buy American compliant.

Manufacturer shall provide a 5-Year Limited Warranty, with the exception of the batteries which shall be covered by a 1-year warranty.

The Manufacturer shall be ISO 9001 certified.

Measurement and Payment

RRFB assembly systems shall be measured for payment by each system installed. Each individual RRFB system supports a single crossing location.

The contract unit price paid for “Furnish and Install RRFB Crossing System(per Crosswalk)”, “Furnish and Install Pole, Base and Foundation (RRFB)”, “Furnish and Install PPB Pole & Button”, and “Relocate RRFB System with New Foundation” shall include full compensation for all loading, transportation, storing, preparation, engineering, connections, hardware, light bars, solar panels, luminaires, cabinets, communication systems, concrete, reinforcement, potholing, excavation, backfill, shoring, miscellaneous PCC and PC patching, sidewalk patching, mounting of signs, cables/conductors, wiring, grounding conductors, conduits, trenching and backfill, fabrication, controllers, transformers, push buttons, pull boxes, handholes, testing, training, labor, materials, tools, warranties, equipment, and all incidental work, and no additional compensation shall be made therefor.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 208

SUPPLEMENTAL PROVISIONS
TO

STANDARD SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION

PART 8, LANDSCAPING AND IRRIGATION

SECTION 800 – MATERIALS

800-1 LANDSCAPE MATERIALS.

800-1.2.3 Commercial Fertilizer.

Add the following:

Preplant fertilizer shall be granular commercial fertilizer 7 -7-7 or approved equal. Postplant fertilizer shall be 12 -4-6 or approved equal with Ca, Fe, Zn, and Mn and with the majority of nitrogen in nonammoniac form to prevent acidification of soil. Plan ting tablets shall be compressed fertilizer tablets with a 20 -10-5 analysis. Hydroseed fertilizer shall be long -lasting, controlled-release, plastic-coated, uniform in composition, free -flowing, suitable for application with approved equipment, and shall c ontain the minimum available percentages of nitrogen, phosphoric acid, potash and sulfur required by tables 212-1.2.5.1(A) through 212-1-2-5-3(A).

800-1.2.4 Organic Soil Amendment.

Add the following:

For all types of Organic Soil Amendment materials produced from pine trees grown in Alameda, Monterey, Santa Clara, Santa Cruz or San Mateo Counties shall not be used in the Work. Type 1A Organic Soil Amendment shall conform to the requirements for type 1 Organic Soil Amendment except as modified hereinafter. Type 1A Organic Soil Amendment shall be a wood or rice residual product derived from the bark of pine, white fir, or red fir or cedar or redwood shavings or rice hulls. Type 1A Organic Soil Amendment shall be manufactured from clean wood, free from clods coarse objects and rocks and shall conform to the properties shown in Table 800-

1.2.4(B):

Table 800-1.2.4(B)

SOIL AMENDMENT PROPERTIES
Property Minimum Maximum
Dry Weight Nitrogen (1) (1)
Dry Weight Passing 25 mm (1”) Sieve 100% 100%
Dry Weight Passing #4 Sieve 95% 100%
Dry Weight Passing #16 Sieve 45% 65%
Dry Weight Passing #30 Sieve 30% 40%
Dry Weight Passing #50 Sieve 0% 10%
Dry Weight Passing #100 Sieve 0% 2%
Salinity (1) (1)
Iron ( Dilute acid soluble on dry weight basis) 0.08% --- Ash (dry weight basis) 0% 6.0%
pH 6.0 7.0
Wettability (1) (1)
(1) (As Required by Table 212-1.2.4(A) SSPWC)

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 209

For all types of Organic Soil Amendment the Contractor shall supply the Engineer a sample of the proposed amendment accompanied by an analytical analysis from a qualified agricultural laboratory certifying compliance to the requirements herein. Qualified a gricultural laboratories shall have an on-going quality assurance program that fulfills the requirements of the most recent version of the “Western States Laboratory Proficiency Testing Program Soil and Plant Analytical Methods”. Certificates of compliance shall contain a statement attesting that the organic soil amendment meets the requirements of these specifications and that the testing agricultural laboratory does fulfill the requirements of “Western States Laboratory Proficiency Testing Program Soil and Plant Analytical Methods”. Said submittal shall be in accordance with Section 2-5.3.3.

800-1.4.1 General.

Add the following:

Plants shall be the variety and size shown on the plans or in the special provisions and shall conform to the requirements of these specifications. Contractor shall submit color photos of all plant material, including a measuring stick or scale reference, to the Engineer for approval prior to delivery of material to the site. Contractor shall notify the Engineer 48 hours before each plant delivery so that the Engineer can inspect the plants. The scientific and common names of plants herein specified shall conform to the approved names given in “A Checklist of Woody Ornamental Plants in California, Oregon and Washington” published by the University of California, Division of Agriculture Sciences, Publication 4091 (1979). Each group of plant materials delivered on site shall be labeled clearly as to species and variety. All patented plants (cultivars) required by the plant list shall be delivered with a proper plant patent attached. The Contractor shall obtain clearance from the County Agricultural Commissioner, as required by law, before planting plants delivered from outside the County in which they are to be planted. Evidence that clearance has been obtained shall be filed with the Engineer. All plants furnished by the Contractor shall be true to type or name as shown on the plans and shall be tagged identifying the plants by species or variety; however, determination of plant species or variety will be made by the Engineer and the Engineer’s decision shall be final. Plants shall be individually tagged or tagg ed in groups by species or variety. All plants shall comply with Federal and State laws requiring inspec tion for plant diseases and infestations. Inspection certificates required by law shall accompany each shipment of plants, and certificates shall be delivered to the Engineer.

Plants furnished by the Contractor shall be healthy, shapely, and well-rooted, and roots shall show no evidence of having been restricted or deformed at any time. Plants shall be well -grown, free from insect pests and disease, and shall be grown in nurseries which have been inspected by the State Department of Food and Agriculture and have complied with the regulations thereof.

The Engineer is the sole judge as to acceptability of each plant. Vigorous, healthy, well-proportioned plants are the intent of this specification. Plants which are even moderately “overgrown”, or are showing signs of decline or lack of vigor, are subject to rejection. The size of the plants will be as shown on the plans. Plants larger in size than specified may be used with the approval of the Engineer, but the use of larger plants will make no change in contract price. If the use of larger plants is approved, soil amendments shall be increased proportionately. All plants not conforming to the requirements herein specified shall be considered defective and such plants, whether in place or not, shall be marked as rejected, and immediately removed from the site and replaced with new plants by the Contractor at the Contractor’s expense. The Enginee r reserves the right to change the species, variety, and/or sizes of plant material to be furnished, provided that the cost of such plant changes do not exceed the cost of plants in the original bid,

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 210 and with the provision that the Contractor shall be notified in writing, at least 60 days before the planting operation has commenced.

No plant shall be transported to the planting area that is not thoroughly wet throughout the ball of earth surrounding the roots. Any plant that, in the opinion of the Engineer, has a damaged root ball or is dry or in a wilted condition when delivered to the planting area will not be accepted, and shall be replaced by the Contractor at the Contractor’s expense. Each plant shall be handled and packed in the approved manner for that species or variety, and all necessary precautions shall be taken to ensure that the plants will arrive at the site of the work in proper condition for successful growth. Trucks used for transporting plants shall be equipped with covers to protect plants from windburn.

Root condition of plants furnished by the Contractor in containers will be determined by removal of earth from the roots of not less than 2 plants nor more than 2 percent of the total number of plants of each species or variety, except when container-grown plants are from several sources, the roots of not less than 2 plants of each species or variety from each source will be inspected by the Engineer. In case the sample plants inspected are found to be defective, the Agency reserves the right to reject the entire lot or lots of plants represented by the defective samples.

Any plants rendered unsuitable for planting because of this inspection will be considered as samples and will not be paid for.

The Contractor shall notify the Engineer when plants are to be shipped to the project site. The notification shall be given not less than 10 days prior to the actual shipment date.

800-1.5.3 Tree Stakes. Modify as follows: Tree stakes shall be 50mm (2”) diameter turned lodgepole pine, pointed on their driven end.

Add the following section:
800-1.6 Erosion Control Matting. Erosion control matting shall be made of 100 -percent- biodegradable, weed-free wheat straw of thickness and density yielding 270 grams per square meter (0.50 lb./sy) with photodegradable polypropylene netting with a density of 0.89 grams per square meter (1.64 lb/1000 sy) having an approximate mesh interval of 50 mm x 50 mm (2“ x 2“) on each face of the straw mat. The straw mat shall be sewn together with unidirectional lines of cotton or polypropylene thread spaced approximately 50 mm (2”) apart. Erosion control matting shall be “North American Green, DS150”, “BonTerra S2”, or approved equal.

Add the following section:
800-1.7 Erosion Control Mat Staples. Erosion control mat staples shall be 25 mm x 150 mm (1” x 6”), U-shaped 11-gauge mild steel staples.

Add the following section:
800-1.8 Root Barriers. Root barriers shall be no less than 1m (39“) in width. Root barriers shall be “Biobarrier”, as manufactured by Reemay, Inc., 70 Old Hickory Boulevard, Old Hickory, TN 97138, Phone 615-847-7000, no substitutes will be accepted.

800-2 IRRIGATION SYSTEM MATERIALS.

800-2.1.3 Plastic Pipe for Use with Solvent Weld Socket or Threaded Fittings.

Add the following:

Except as provided in this section, all buried piping in the irrigation system shall be installed with underground utility marking tape conforming to the requirements of section 207-21 and identifying it

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 211 as reclaimed water. Intermittent pressure lines (lines on the downstream side of a controller valve that will not be subject to constant pressure) will not require underground utility marking tape. All PVC pipe used for irrigation systems shall be colored purple by the addition of a dye integral to the PVC. Painted pipe will not be accepted. Pressure mainline piping for sizes 50 mm (2”) and larger shall be PVC having a pressure rating of 2170 kPa (315 PSI), S.D.R. 13.5. Stenciled pipe is required for all irrigation system piping including portions not required to be marked with underground utility marking tape. All pipe shall have stenciling appearing on both sides of the pipe with the marking “Reclaimed Water” in 16 mm ( 5/8”) high letters repeated every 300 mm (12“). PVC non -pressure buried lateral line piping shall be PVC Schedule 40.

Add the following section:
800-2.1.6 Brass Pipe and Fittings. Brass pipe shall be IPS standard weight 125 LB 85 percent copper and 15 percent zinc, trade designation seamless red brass pipe conforming to the requirements of ASTM B43 -91. Brass pipe fittings and connections shall be Standard 125 LB class 85 percent red brass fittings and connections.

800-2.2.7 Valve Boxes.

Add the following:

All valve boxes shall be marked “RCV”, “BV” or “QC”, “PB” respectively. Remote control valves shall be marked with station numbers embossed on the valve cover with a brass tag. (RCV boxes shall have locking covers.) Other boxes such as pull boxes, etc., shall be marked with appropriate identification.

Add the following section:
800-2.2.8 Ball Valves. Ball valves shall have bottom -loaded pressure-retaining stems, glass - reinforced seats, and reinforced TFE stem packing seals. Valves sizes 13 mm (½“) to 50 mm (2“) shall be pressure rated at 4140 kPa (600 PSI) WOG and 1030 kPa (150 -PSI) saturated steam.

Each valve shall be tested, air under water, in the opened and closed position by the manufacturer. Ball valve must conform to Federal Specification WW -V-35B, Type II, Class A, Style 3, End Connection A or C.

Add the following section:
800-2.2.9 Pressure Regulator Valve. Pressure regulator valve shall be bronze body with screw fitting.

Add the following section:
800-2.2.10 Wye Strainers. Wye strainers shall have a cast iron or all -bronze body with a removable stainless steel or monel strainer. Wye strainers shall be capable of withstanding a cold water working pressure of 1034 kPa (150 psi). Wye strainers at backflow preventer assemblies shall be equipped with a gate valve at the outlet. All other wye strainers shall be equipped with a garden valve at the outlet.

The strainer screen for the wye strainer in a backflow preventer as sembly shall have an open area equal to at least 3 times the cross-sectional area of the pipe based on an iron pipe size and shall be woven wire fabric with 850-µm mesh or perforated sheet with 1.14 mm (0.045”) diameter holes.

All other wye strainers shall be equipped with 425-µm strainer screens.

800-2.3 Backflow Preventer Assembly. Add the following: Backflow preventers shall be one of the approved reduced pressure principle devices listed by the California Department of Health

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 212 Services, Division of Drinking Water and En vironmental Management, 601 North 7th Street, Mailing Station (MS) 92, P.O. Box 942732, Sacramento, CA 94234-7320.

800-2.4 Sprinkler Equipment.

Add the following:

All sprinkler heads are to have factory built -in check valves or a check valve under each head.

Drip assemblies shall meet the following requirements: The drip emitter shall be Pepco Quadra or Rainbird XERI-Bird-8 or approved equal as called on drawings, with four ports. Drip tubing for emitter outlets shall be Rainbird (RBT-160V), Salco, or approved equal. Drip tubing stakes shall be Rainbird No. RS-13, Salco, or approved equal. Bug cap for drip tubing shall be manufactured by Rainbird, Pepco, or approved equal. The drip pressure regulator shall be Rainbird, Netafim PVR, or approved equal. Drip emitter filter shall be Amiad, Rainbird, or approved equal. Drip emitter access boxes shall be Rainbird No. SEB -6X, Salco Subterranean Emitter Box, or approved equal. Check valves shall be of heavy-duty virgin PVC construction with FIP thread inlet and outlet. Internal parts shall be stainless steel and neoprene. Antidrain valves shall be field adjustable against drain out from 1.5 m to 12 m (5’ to 40’) of head. All sprinkler heads that are without valves in the heads are to have an antidrain valve feature and shall have an excess flow feature, which will automatically stop the flow of water when it exceeds the GPM preset by the manufacturer. Check valves shall be King Bros., Rainbird, or approved equal.

Backflow preventers shall be factory assembled and shall include 2 check valves, one pressure differential relief valve, 2 shut-off valves and 4 test cocks. Backflow preventer and valves shall be the same size as the pipeline in which they are installed, u nless otherwise shown on the plans.

Backflow preventer shut-off valves shall be manufactured from iron or bronze and shall be either resilient wedged gate valves, resilient seated and fully ported ball valves, or resilient seated butterfly valves. Threaded type shut-off valves shall be provided with a union on one side of each valve. Unions shall be brass or malleable iron.

Add the following section:
800-2.4.1 Additional Equipment. Contractor shall provide the following items to the Engineer:

1. Two control valve keys.

2. Two wrenches for removing each different type of sprinkler head.

3. Two quick coupler keys. The keys and hose ells shall be of the same manufacturer as

4. the coupling valve.

5. Five keys for opening and locking each automatic controller and enclosure.

Add the following section:
800-2.5 Flexible Hose. Flexible hose shall be nonrigid polyvinyl chloride (nonrigid PVC) hose conforming to the specifications of ASTM Designation: D 2287, Cell-type 6464500.

Wall thicknesses of nonrigid PVC hose shall conform to Table 800 -2.5(A) when determined in accordance with ASTM Designation: D 2122.

TABLE 800-2.5(A)

FLEXIBLE HOSE
Hose Size-Nominal Minimum Wall Thickness* Range
(Millimeters) (Inches) (Millimeters) (Inches) (Percent) 15 5/8 3.73 0.147 12
20 3/4 3.91 0.154 12
25 1 4.55 0.179 12
*as measured at any point on the cross section.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 213

The hose shall provide leak-free, non-separating connections suitable for the purpose intended when connected to the fittings specified herein. Fittings for flexible hose shall be injection molded PVC, Schedule 40, conforming to the specifications of ASTM Designation: D 2466. Fittings shall be solvent cemented type. Solvent cement for flexible hose and fittings shall be of commercial quality specifically manufactured for use with nonrigid PVC hose. Primer for flexible hose fittings shall be the same as specified for plastic pipe supply line fittings.

800-3 ELECTRICAL MATERIALS.

800-3.1 General.

Add the following:

All electrical materials shall conform to the requirements of the 1996 National Electrical Code.

800-3.2.2 Conductors.

Add the following:

Low voltage electric wiring running from controller to the automatic control valves shall be no smaller than No. 14 solid single conductor, copper wire, 0.015 mm (60 mil) insulation, 0.015 mm (60 mil) neoprene jacket, style UF (Direct Burial), or equal, color code wires to each valve. Neutral wires shall be white, no smaller than No. 12 solid single conductor wire, 0.015 mm (60 mil) insulation, 0.015 mm (60 mil) neoprene jacket, style UF (Direct Burial).

800-3.3 Controller Unit.

Add the following:

All controllers shall be grounded by one 19 mm (5/8”) diameter by 3 m (10’) long stainless steel grounding rod and a 50-ohm resistance lightning arrestor.

SECTION 801 - INSTALLATION

801-2 EARTHWORK AND TOPSOIL PLACEMENT.

801-2.2.2 Fertilization and Conditioning Procedures.

Add the following:

The Contractor shall cultivate the surface of all areas to be planted or hydroseeded by discing, ripping or scarifying the finish grade. After cultivation the Contractor shall clear the planting areas of stones to the depth of cultivation and shall be rake the planting areas to a smooth friable and plantable surface. The Contractor shall cultivate all planting areas, except slopes steeper than 3- 1/2:1 (horizontal to vertical), to a depth of 300 mm (12”). The planting areas that are slopes steeper than 3 -1/2:1, shall be cultivated to a depth of 150 mm (6”). After cultivation, the soil amendments shown in table 801 -2.2.2(A) shall be thoroughly blended 150 mm (6”) deep in all planting areas. Except for planting pits the cultivation depths are designated as the root area.

Backfill for planting pits shall conform to the requirements of section 801 -4.5. After surface preparation and application of the soil amendments shown in Table 801 -2.2.2(A) the Contractor shall obtain a minimum of one test for each soil propert y listed in Tables 801 -2.2.2(B) and 801-

2.2.2(C) from each median planter, at least one test per 150 m (500’) from each parkway and for each hectare (2.5 acres) of hydroseeded area and shall submit the results of said tests to the Engineer. The Contractor shall then adjust the soil properties to the acceptable ranges of soil properties shown in Tables 801-2.2.2(B) and 801-2.2.2(C) using such materials and methods as may be necessary. Organic soil amendment materials shall not be included in the samples used

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 214 to determine compliance to the soil particle gradation requirements of Table 801 -2.2.2(C). If adjustments are necessary, the soil shall be tested by the Contractor after such adjustments for each soil property listed in Table 801-2.2.2(B) and 801-2.2.2(C) to determine that the adjustments to the soil made by the Contractor result in soil properties within the acceptable ran ge. The Contractor shall adjust the soil properties and show acceptable ranges prior to any planting or application of hydroseed slurry. Prior to the start of any planting or application of hydroseed slurry the surface and root area shall be evenly and thoroughly moistened to no less than 75 percent of field capacity. The Contractor shall certify, in writing, that the ground surface has been prepared in accordance with this section and shall request inspection by the Engineer prior to any planting or seeding. The Contractor shall obtain the Engineer’s approval before any planting or hydroseeding.

TABLE 801-2.2.2(A)

SOIL AMENDMENTS
Soil Amendment Metric Application Rate Approx. U.S. Application Rate Agricultural Gypsum 500 g per square meter 100 lbs. per 1,000 square feet Iron Sulfate 50 g per square meter 10 lbs. per 1,000 square feet Calcium Carbonate
Lime
500 g per square meter 100 lbs. per 1,000 square feet
Organic Soil
Amendment

0.04115 cubic meters per square
meter (average depth 41 mm)
5 cubic yards per 1,000 square
feet (average depth 1 5/8”)

TABLE 308-2.2.2(B)

SOIL PROPERTIES
Soil Property Acceptable Range Test Method Repeatability Range of Test pH 6.5 to 7.3 Saturation Paste pH
 0.1 pH
Dissolved Salts
(Ece)
 4.0 dS m-1 Saturation Paste
Soluble Salts
 7%
Liquid Limit N/A to 30 ASTM D 423
 2
Plasticity Index NP to 10 ASTM D 424
 2

TABLE 308-2.2.2(C)

SOIL PARTICLE GRADATION
Sieve Siize Percent Passing
19 mm (3/4”) 100

9.5 mm (3/8”) 95 - 100

4.75 mm (No. 4) 60 - 85

1.89 mm (No. 10) 40 - 75
475
 m (No. 40) 35 - 70
75  m (No. 200) 30 - 70

For areas to receive planting of all types, excluding only hydroseeding, the Contractor shall amend the prepared soil by blending 200 g of 7-7-7 fertilizer per square meter (40 lbs. per 1,000 square feet) into the top 150 mm (6”) of soil after the completi on of adjustment of soil properties and acceptance of the planting area by the Engineer. The Contractor shall apply post -plant 12-4-6 fertilizer at the rate of 20 pounds per 1,000 square feet, 30 days after planting and every 30 days through the end of the maintenance period.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 215 801-2.3 Finish Grading.

Add following:

The Contractor shall prepare the finish grade in hydroseed slope areas with a moderately rough texture to provide a suitable surface for adherence of the hydroseed mix.

801-4 PLANTING.

801-4.1 General.

Add the following:

The Contractor shall perform actual planting during those periods when weather and soil conditions are suitable and in accordance with locally accepted horticultural practice and as approved by the Engineer. No planting shall be done in any area until it h as been satisfactorily prepared in accordance with these specifications. Soil moisture level prior to planting shall be no less than 75 percent of field capacity. The Contractor shall obtain the Engineer’s approval of planting pits before planting operations begin. For pit planted vegetation when the soil moisture level is found to be insufficient for planting, the Contractor shall fill the planting pits with water and allow them to drain before starting planting operations. No more plants shall be distributed in the planting area on any day than can be planted and watered on that day. The Contractor shall plant and water all plants as herein specified immediately after removal from their containers.

Containers shall not be cut prior to placing the plants i n the planting area. It shall be the responsibility of the Contractor to provide continuous horticultural services and temporary and/or permanent irrigation to all planted and hydroseeded areas so that the planted and hydroseeded vegetation is 100 percent healthy and thriving prior to, and throughout the, landscape maintenance period.

801-4.2 Protection and Storage.

Add the following:

The Contractor shall submit a sheltered and secure location for on-site plant storage area for the Engineer’s approval prior to the delivery of any plant materials. Any plant determined by the Engineer to be wilted, broken, or otherwise damaged shall be r ejected at any time during the project, whether in the ground or not. All plants shall be handled by their containers. Any plant that has been handled by its trunk or stem shall be rejected. All rejected plants shall be removed from the site immediately.

801-4.3 Layout and Plant Location.

Modify as follows:

Planting areas shall be staked by the Contractor and the Contractor shall obtain the Engineer’s approval of the planting layout before planting operations begin.

801-4.5 Tree and Shrub Planting.

Add the following:

The Contractor shall amend the backfill for planting holes to a thoroughly blended mixture of clean loamy soil meeting the requirements of Tables 801-2.2.2(B) and 801-2.2.2(C) and then blend the amendments listed in Table 801-4.5(A) into the backfill for planting holes.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 216 TABLE 801-4.5(A)

BACKFILL AND AMENDMENTS FOR TREE AND SHRUB PLANTING
Soil Amendment Metric Application Rate Approx. U.S. Application Rate Agricultural Gypsum 18 kg per cubic meter 30 lbs. per cubic yard Iron Sulfate 600 g per cubic meter 1 lb. per cubic yard Calcium Carbonate Lime 6 kg per cubic meter 10 lbs. per cubic yard Organic Soil Amendment 0.67 cubic meters per cubic meter 2/3 cubic yards per cubic yard Planting Tablets 1 1 per 100 mm dia. pot container 1 per 4” dia. pot container Planting Tablets 1 2 per 19 liter container 2 per 5 gal. container Planting Tablets 1 1 per each 50 mm width of each
box-size container
1 per each 2” width of each
box-size container
1 Planting tablet requirements are not cumulative and apply to the size container indicated

Pruning shall be limited to the minimum necessary to remove injured twigs and branches, and to compensate for loss of roots during transplanting, but never to exceed one -tenth the branching structure. Pruning may be done only with the approval of, and in t he presence of, the Engineer.

Cuts over 19 mm (¾“) shall be painted with an approved tree wound paint.

Add the following section:
801-4.5.1 Root Barriers . Root barriers shall conform to section 212 -1.8, Root Barriers. The Contractor shall install root barriers continuously at the edges of all median planter areas. The top of the root barrier shall be 25 mm (1”) below the finish grade of the planted area. The bottom of the root barrier shall be installed 520 mm (20 1/2“)below the finish grade of the planted area.

Install as indicated on the plans, eliminating any breaks in the barrier by providing at least 150 mm (6”) of overlap at splices or damaged areas. Splices and repair patches shall be stitched to the root barrier material by a running stitch of no less than 6  1 stitches per 25 mm (1”).

801-4.6 Plant Staking and Guying.

Add the following:

The Contractor shall install all boxed trees per drawings L -1 and L-2 of the San Diego Regional Standard Drawings unless details shown on the project plans differ therefrom.

801-4.8.2(b) Method B.

Add the following:

The Contractor shall prepare hydroseeding slurry on the job site. Slurry additives shall arrive at the site in bags sealed and properly identified by the manufacturer. All specified additives and water shall be added on the job site at the rates specified and shall be thoroughly mixed at the job site. The Contractor shall add seed to the slurry after the fiber mulch has been thoroughly incorporated. The Contractor shall spray all areas with a uniform, visible coat using the green color of the mulch as a gui de. The Contractor shall apply the slurry in a sweeping motion, in an arched stream so as to fall like rain allowing the mulch fibers to built on each other until a good coat is achieved and the material is spread, evenly, at the required rate per area. The Contractor shall use care not to drag spray hoses over container planted material and shall attempt to spray from the edges of the planting areas wherever possible. Any slurry mixture which has not been applied to the planting areas within four (4) hours after mixing is be rejected and removed from the project at the Contractor's expense. Any slurry spilled into areas outside the limits of work shall be cleaned up at the Contractor's expense to the satisfaction of the Engineer. The Contractor shall assure that the site is properly prepared. The Contractor shall repair all tire ruts created by the equipment. Areas needing grading repair prior to hydroseeding shall be blended and floated to match surrounding grades. Areas having less than 80% plant coverage within thirty (30) days

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 217 after the initial application shall be reseeded every twenty (20) days until 80% of the ground surface is evenly covered by hydroseeded or subsequently reseeded growth.

Add the following section:
801-4.8.3.1 Weed Eradication. The Contractor shall water all irrigated areas to be hydroseeded for three (3) weeks prior to hydroseeding to allow for germination of the weed seeds. The Contractor shall spray all weeds with a post emergent herbicide immediately after the completion of the three week irrigation period. After two (2) weeks, the Contractor shall again eradicate the weeds and complete the preparation of the soil prior to the application of the hydroseed mixes.

Add the following section:
801-4.10 Erosion Control Matting Installation

Add the following section:
801-4.10.1 General. Before installation of erosion control matting the Contractor shall complete all soil preparation, fine grading, and hydroseeding of the areas to receive erosion control matting.

Add the following section:
801-4.10.2 Coordination with Hydroseeding. Erosion control matting shall be installed by the Contractor immediately after the first application of hydroseed materials. In all cases the Contractor shall place the erosion control matting within three days after the first hydroseed material application. Should any seed in the hydroseed materials begin to germinate within the three-day period after application or before the installation of the erosion control matting, the installation of the erosion control matting shall be considered as late and the Contractor shall disc the hydroseed materials into the top 100m (4”) of the underlying soil, condition the soil for hydroseeding, apply hydroseeding materials at the rates and of the type specified and then install the erosion control matting. No additional payment will be made for second or subsequent hydroseed applications resulting from late installation of erosion control matting.

Add the following section:
801-4.10.3 Installation. The Contractor shall install erosion control matting using the following techniques:

1. Begin at the top of the slope by placing the erosion control matting into a 150 mm (6“) wide by 150 mm (6“) deep trench with the end of the matting laid flat in the bottom of the trench

2. Anchor the end of the erosion control matting with erosion control mat staples spaced no more than 300 mm (12”) on centers placed at the intersection of the bottom and the downhill vertical face of the trench.

3. Roll the erosion control matting down the slope.

4. Staple the erosion control matting on an alternating grid consisting of three across and two across lines of staples in horizontal lines spaced 900mm (3’) on centers.

5. Erosion control mat so stapled shall be spaced such that no less than 1 ¾ staples per square meter (1½ staples per square yard) are provided to anchor the erosion control matting.

6. Start the adjacent erosion control mat as in Item 1. of this section, overlapping the previously placed mat by no less than 50 mm (2”).

7. Staple placement may be such as to use the staples used to secure the adjacent mat to secure both mats along their edges.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 218 801-5 IRRIGATION SYSTEM INSTALLATION.

801-5.1 General.

Add the following:

The Contractor shall apply irrigation water as often and in sufficient amounts, as conditions may require, to germinate and establish the seed and keep the container plants healthy and growing.

The Contractor shall lay out lines, valves, and other underground utilities and receive the approval of the Engineer before digging trenches. The Contractor shall be responsible for damages caused by its operations. Connections shall be made at approximately the locations shown on the drawings. The Contractor shall b e responsible for unapproved changes. Permission to shut off any existing in-use water lines must be obtained 48 hours in advance, as to the date, time and exact length of time of each shut -off. The Contractor shall demonstrate that the entire irrigation system is under full automatic operation for a period of seven days prior to any planting.

801-5.3 Irrigation Pipeline Installation.

Add the following:

The Contractor shall install all pressure main line piping from the irrigation system so as to maintain 3.1 m (10’) minimum horizontal separation from all potable water piping. Where reclaimed and potable water pressure mainline piping cross, the reclaimed water piping shall be installed below the potable water piping, sleeved in a pressure rating of 200 PSI SDR 21 “Alertline” PVC sleeve which extends a minimum of 3.1 m (10’) on either side of the potable water piping and be located to provide a minimum vertical clearance of 300 mm (12”) between the reclaimed and potable water lines. Conventional (white) PVC pipe Schedule 40 may be used for sleeving material if it is taped along its entire length with 75 mm (3“) wide purple warning tape which reads “Caution Reclaimed Water”.

For trenching through areas where topsoil has been spread, the Contractor shall deposit topsoil on one side of trench and subsoil on opposite side. Subsoil shall be free of all rocks 13 mm (½“) in diameter or larger, debris, and litter, prior to use as bac kfill. The Contractor shall repair any leaks and replace all defective pipe or fittings until lines meet test requirements. The Contractor shall not cover any lines until they have been inspected and approved by the Engineer for tightness, quality of workm anship, and materials. The Contractor shall not be backfill trenches until all required tests and observations are performed. Observations include sprinkler heads, all fittings, lateral and mainline pipe, valves, and direct burial wire.

801-5.3.3 Plastic Pipeline.

Add the following:

The Contractor shall store all pipe and fittings under cover until used, and all pipe and fittings shall transported in a vehicle with a bed long enough to allow the length of pipe to lay flat so as not to be subjected to undue bending or concentrated external load at any point. Pipe ends and fittings shall be wiped with MEK, or equal, before welding solvent is applied. Welded joints shall be given a minimum of 15 minutes to set before moving or handling. All field cuts shall be beveled to remove burrs and excess before fitting and gluing together. The Contractor shall center load pipe with small amount of backfill to prevent arching and slipping under pressure. Joints shall be exposed for inspection during testing. Plastic -to-plastic joints shall be solvent -welded, using only solvent recommended by pipe manufacturer.

Add the following section:
801-5.3.5 Installation of Brass Pipe. The Contractor shall cut brass piping by power hacksaw, circular cutting machine using an abrasive wheel, or hand hacksaw. No piping shall be cut with metallic wheel cutter of any description. The Contractor shall ream and remove rough edges or

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 219 burrs on all pipe so that smooth and unobstructed flow is obtained, place Teflon tape, Teflon dope, or approved equal on male threads only, and tighten to prevent any leakage. The Contractor shall tighten screwed joints with tongs or wrenches. Caulking is not permitted.

Add the following section:
801-5.6. Valves. add the following:

The Contractor shall install each control valve in a separate valve box with a minimum of 300 mm (12”) separation between valves and 150 mm (6”) from any fixed object or structure.

Add the following section:
801-5.3.6 Valve Boxes. The Contractor shall install no more than one valve per box. All boxes are to be marked as to the type of valve. Remote control valve boxes shall also indicate control station number.

Add the following section:
801-5.3.7 Backflow Preventer. The Contractor shall install backflow preventer assembly in accordance with manufacturer's specifications and as directed on drawings. Exact location and positioning shall be verified on the site by the Engineer.

801-5.3.8 Sprinkler Head Adjustment.

Add the following:

The Contractor shall flush and adjust all irrigation heads and valves for optimum performance and to prevent overspray onto walks, roadways buildings, walls, and other structures.

Add the following section:
801-5.3.9 Drip Assembly. The Contractor shall install drip emitter filter on the supply side of all electric pressure regulating control valve for all emitter systems. The Contractor shall install a flush valve on the discharge side of all drip laterals.

801-5.6 Automatic Control System Installation.

Add the following:

The Contractor shall install all portions of the electrical installation with materials and methods conforming to the requirements of the 1996 National Electrical Code. The Contractor shall provide no less than one control wire and one common ground wire to service each valve in system.

801-5.6.1 Sprinkler Coverage Test.

Add the following:

This test shall be accomplished before any ground cover is planted.

801-6 MAINTENANCE AND PLANT ESTABLISHMENT.

Add the following:

For hydroseeded areas, median planting and mitigation area, The Contractor shall maintain said areas for period of no less than 120 days or until final acceptance of the project, whichever is the greater. Mowing is not required for hydroseeded areas. The Contractor shall provide complete landscape maintenance of all planted areas. The work shall include, but not be limited to, watering, litter control, weed control, stake repair, cultivating, supplementary fertilization, repair of irrigation systems, and control of diseases and pests. The Contractor shall submit a written plan to control weeds, disease, and pest infestations in the planting areas. The submittal shall conform to the requirements for shop drawings as specified in section 2 -5.3 et seq. of the specifications. The Engineer shall approve all methods and materials for such control. Upon approval, the Contractor shall implement the control measures, exercising extreme caution in using pesticides and taking all

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 220 steps to ensure the safety of the public. Only licensed personnel will be permitted to perform toxic spraying work. During the plant establishment period, the Contractor shall furnish sufficient workers and equipment on a daily basis to perform the work required by this section. Any day when the Contractor fails to adequately carry out specified maintenance work, as determined necessary by the Engineer, will not be credited as one of the plant establishment days. All planting areas which are damaged by construction shall be repaired by the Contractor within twenty (20) days following completion of construction in such. The Contractor shall repair such damaged areas. The repair shall consist of bringing the damaged area back to final grade, preparing the soil, replanting the area with the same vegetation as originally specified, and maintaining the area to achieve acceptable plant establishment.

The Contractor shall provide temporary irrigation for hydroseeded areas for a minimum of 120 days to ensure adequate plant establishment. Towards the end of the maintenance period , the Contractor shall gradually reduce the amount of irrigation to allow plant adaptation to non-irrigated conditions. Upon the approval of the engineer, the temporary irrigation system shall be shut off at the end of the maintenance period. The hydroseeded areas must have their growth of 80% established and the coverage must be evenly successful over the entire hydroseeded area and adequate to prevent erosion no less than 30 days before the end of the maintenance period. Should the coverage not be achieved the maintenance period shall be extended until the required coverage is achieved plus an additional 30 day period. The Contractor shall call for a final inspection 30 days before the end of the maintenance period and at the end of the maintenance period. Failure to pass inspection will result in an extension of the maintenance period. The Contractor shall continue to provide maintenance for such time necessary to obtain conformance to the specifications.

801-8 PAYMENT.

Add the following:

The lump-sum or unit prices set forth in the contract documents shall include, but not be limited to, full compensation for furnishing all labor, materials, tools, and equipment and performing all work necessary to complete, maintain, and guarantee the planting and irrigation work described or specified in the contract documents, including soils testing and recommended soil amendments, seed and hydroseed slurry, tree stakes, bark mulch, erosion control matting, plant materials, temporary irrigation and perm anent irrigation, including reduced -pressure back-flow preventer, ball valves, drip valve assembly, electric control valves, quick couplers, control wires, pull boxes, valve boxes, all piping and sleeves, electrical conduits, irrigation heads, drip emitters, bubblers, drip irrigation equipment, connection from electrical service to irrigation electrical meter, connection from meter to irrigation controller(s), installation of controller enclosure, concrete pads, preparation, correction, reproduction and lam ination of “as -built” drawings, controller charts, assembly and submittal of the check list and operation and maintenance manuals and all appurtenances to the aforementioned items, as well as 120 days' maintenance and project guarantees. After completion of the project, the Engineer will retain $12,000 of the total contract amount, and will subsequently disburse the $12,000 to the Contractor on a monthly basis of $3,000 per month. The Engineer reserves the right to stop payment until all punch list submitted to the Contractor every month are completed.

Add the following section:
801-9 GUARANTEE.

The Contractor shall guarantee all 600 mm (24”) box trees installed under the contract to live and grow for one year from the day of final acceptance of the contract work. The Contractor shall guarantee all other plant material, including ground covers to live and grow for a period of 30 days from the last day of the maintenance period or final acceptance of the contract work, whichever is the later. The Contractor shall replace, at its expense, all plant material found to be dead, missing,

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 221 or in poor condition during the maintenance period within 5 days of discovery of such plant material.

The Engineer shall be the sole judge as to the condition of the plant material. Plant material found to be dead or in poor condition within the guarantee period shall be replaced by the Contractor, at its expense, within 15 days of written notification. Replacements shall be made to the same specifications required for the original plantings.

The Contractor shall submit written vegetation, planting and irrigation guarantee in approved form that all work showing defects in materials or workmanship will be repaired or replaced at no cost to the Engineer for a period of one year from the date of a cceptance by the Engineer. The Guarantee form shall be retyped on the Contractor's letterhead and contain the following verbiage:

“Guarantee For Vegetation, Planting and Irrigation System For (Project Name) We hereby guarantee that the vegetation, planting and irrigation system we have furnished and installed for (project name) is free from defects in materials and workmanship, and the work has been completed in accordance with the drawings and specifications . We agree to repair or replace any defect in vegetation, material or workmanship, including that due to ordinary wear and tear, which may develop during the periods specified in section 308-7 of the Standard Specifications and the Special Provisions of sa id project from date of completion of the Work or termination of any maintenance period, whichever is the later, and also to repair or replace any damage resulting from the repairing or replacing of such defects at no additional cost to the Agency.

This guarantee does not extend to unusual abuse or neglect that may occur subsequent to the date of completion of the Work or termination of any maintenance period, whichever is the later. We shall make such repairs or replacements within a reasonable time , as determined by the Engineer, after receipt of written notice. In the event of failure to make such repairs or replacements within a reasonable time after receipt of written notice from the Engineer, we authorize the Engineer to proceed to have said repairs or replacements made at our expense, and we will pay the costs and charges therefore upon demand.

Project: (Project Name)
Location: (Legal Description of Project Property)
Name of Contractor:

Address: (Of Contractor)
Telephone: (Of Contractor)
By: (Typed or printed names of signing Officer(s) of the Contractor authorized to bind the Contractor in legal matters)
Title: (Of said officer(s))
Signature(s)
Date of Execution:“

Add the following section:
801-9.1 Record Drawings. In addition to the requirements of section 2-5.4, herein, the Contractor shall prepare r ecord drawings that show all changes in the work constituting departures from the original contract drawings , including those involving both constant -pressure and intermittent-pressure lines and appurtenances. The Contractor shall accurately record, on a daily basis, on one set of bl ue lin e prints of the irrigation drawings, all changes in work constituting departures from the original contract drawings, including changes in both pressure and nonpressure line. The Contractor shall post information on record drawings no later than the next working day after the work is installed. The Contractor shall record changes and dimensions in a legible and professional manner. When the drawings are approved by the Engineer the Contractor shall transfer

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 222 all information to a set of reproducible photo mylar drawings. Items required to be shown shall be dimensioned by the Contractor from two permanent points of reference (buildings, monuments, sidewalks, curbs, pavement). The accuracy of location of all items to be shown on the drawings shall be 150 mm (6”) in both the vertical and horizontal planes. All text and numerals placed on drawings shall be 0.30 mm ( 1/8”) in size. Facilities and items to be located in their horizontal and vertical positions and shown on the record drawings include all:

a) Point(s) of connection, for water and electrical services b) Routing of irrigation pressure mainlines
c) Backflow preventors
d) Ball, gate and check valves
e) Irrigation control valves.
f) Quick coupler valves
g) Routing of service wires
h) Routing of control wires
i) Electrical service equipment
j) Electrical junction boxes
k) Irrigation controllers
l) Sleeves for future connections
m) Other equipment of a similar nature (as directed by the Engineer).

The Contractor shall keep the blue print drawings available for the Engineer’s inspection at any time.

The Contractor shall make all changes to reproducible drawings in waterproof black ink (no ball point pen). Changes in dimensions shall be recorded in a legible and professional manner. Record construction drawings shall be maintained at the job site during construction. The Contractor shall provide one set of mylar "record" drawings to the Engineer after submitting blueline prints of the proposed "record" drawings for, and obtaining their approval by, the Engineer.

Add the following section:
801-9.2 Controller Chart. The Contractor shall prepare record drawings which shall be submitted to the Engineer for approval by the Engineer before charts are prepared. The Contractor shall provide one controller chart of the maximum size the controller door will allow, for each controller supplied, showing the area covered by that automatic controller. The chart shall be a reduction of the actual record system drawing with a legend to explain all symbols. If the controller sequence is not legible when the drawing is reduced, The Contractor shall enlarge it to a size that will be readable when reduced. The Contractor shall photocopy the chart, with a pastel transparent color used to show area of coverage for each station. When completed and approved, the Contractor shall hermetically seal the chart between two pieces of plastic, each piece being a minimum 20 mils thick. The Contractor shall complete the charts and obtain the Engineers approval prior to final inspection of the irrigation system.

Add the following section:
801-9.3 Operation and Maintenance Manuals. The Contractor shall prepare and deliver to the Engineer, within 10 calendar days prior to completion of construction, all required and necessary descriptive material in complete detail and sufficient quantity, properly prepared in four individual bound copies. The descriptive material shall describe the material installed in sufficient detail to permit qualified operating personnel to understand, operate, and maintain all equipment. The Contractor shall include spare parts list and related manufacturer information for each equipment item installed. Each manual shall include the following:
a) Index sheet stating Contractor's address and telephone number. b) Duration of Guarantee period.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Page 223 c) List of equipment, with names and addresses of manufacturer's local representative. d) Complete operating and maintenance instructions on all major equipment. e) In addition to the maintenance manuals, the Contractor shall provide the agency maintenance personnel with instructions for major equipment and show written evidence to the Engineer at the conclusion of the work that this service has been rendered.

Add the following section:
801-9.4 Check List. The Contractor shall complete and forward signed and dated checklist to the Engineer before final acceptance of project.
the following checklist at the end of the project, using the format shown:
a) Plumbing permits (if none required, so note)
b) Materials approval
c) Pressure mainline test (by whom, and date)
d) Record drawings completed (received by, and date)
e) Controller chart completed (received by, and date)
f) Materials furnished (received by, and date)
g) Operation and maintenance manuals furnished (received by, and date) h) System and equipment operation instructions (received by, and date) i) Manufacturer warranties (received by, and date)
j) Written guarantee by Contractor (received by, and date)

Appendix A

Resident Notification - Doorhanger
Park Drive Slope Repair and
Drainage Improvements
Access for residents will be maintained.

Lane closures will be in place, but traffic will be
maintained at all times during construction.

Street parking and sidewalk access will be
restricted on some parts.

Please watch for construction signs.

Crews will work to minimize noise and dust.

City of Carlsbad | 442-339-2780 | [email protected]
CarlsbadWorks
NOTICE
June 2024 to January 2025
Monday - Friday
7:30 a.m. - 4:30 p.m.*
Please use caution around the work area.

Thank you for your patience.

A City of Carlsbad contractor is scheduled to do
slope and drainage improvements along Park
Drive near Marina Drive.
*Schedule may change due to weather and other
unforeseen factors
Jason Merritt
Wright Construction Engineering Corp
941-321-0535
[email protected]
Project contact
City of Carlsbad | 442-339-2780 | [email protected]
CarlsbadWorks
NOTICE
*Schedule may change due to weather and other
unforeseen factors
Project contact
Park Drive Slope Repair and
Drainage Improvements
Access for residents will be maintained.

Lane closures will be in place, but traffic will be
maintained at all times during construction.

Street parking and sidewalk access will be
restricted on some parts.

Please watch for construction signs.

Crews will work to minimize noise and dust.

June 2024 to January 2025
Monday - Friday
7:30 a.m. - 4:30 p.m.*
Please use caution around the work area.

Thank you for your patience.

A City of Carlsbad contractor is scheduled to do
slope and drainage improvements along Park
Drive near Marina Drive.

Jason Merritt
Wright Construction Engineering Corp
941-321-0535
[email protected]
Federal Aid Project No: CPFCDSL 5308(025) Page 1

Appendix B

Utility Shutdown

UTILITY SHUTDOWN/

CONNECTION REQUEST
E-28
Public Works
Construction Management & Inspection
1635 Farada y Ave
442-339-2780

www.carlsbadca.gov
DATE OF SHUTDOWN / CONNECTION _____________LOCATION (ADDRESS) _______________________________ DESCRIPTION OF LOCATION (CROSS STREET, ETC.) ___________________________________________________ DATE OF SUBMISSION ____________ CONTRACTOR’S NAME _____________________ PHONE ________________ CONTR
ACTOR’S ONSITE REPRESENTATIVE ___________________________________ MOBILE _______________ ROW PERMIT NO. __________________ NAME OF CITY INSPECTOR ______________________________________ TYPE O

F CONNECTION
SEWER ______ WATER ______ RECYCLED ______ WET TAP _______ TURN ON ______ SHUT DOWN _________ SHUT DOWN DURATION (MILITARY TIME): START ____________ FINISH ____________ TOTAL HOURS ________ SERVICES EFFECTED _____________________________________________________________________________ MATERIAL / EQUIPMENT TO BE USED _______________________________________________________________ DESCRIPTION OF WORK __________________________________________________________________________ ________________________________________________________________________________________________

PLEASE READ BELOW

1. Request must include a DETAILED CONSTRUCTION DRAWING showing proposed construction. (See other side for details)

2. Submission of this request shall be a minimum of two weeks prior to desired shutdown/connection date.

3. If the weather or a situation develops where the time of shutdown is not feasible, a new shutdown time shall be resubmitted to the district for approval.

4. Temporary water supply shall be only from an approved and accepted CMWD line.

5. Contractor may not operate CMWD VALVES OR APPURTENANCES. Only CMWD representatives are authorized to operate valves and appurtenances.

6. There shall be NO SHUTDOWNS MONDAYS, FRIDAYS, WEEKENDS OR CITY HOLIDAYS.

7. The contractor’s representative, identified above, must be onsite during the entire duration of the shutdown.

The contractor’s representative must have the authority to act on the company’s behalf.

CONSTRUCTION MANAGEMENT AND INSPECTION
1635 FARADAY AVE
CARLSBAD, CALIFORNIA 92008
TEL. NO. (442) 339-2780
E-28 Page 1 of 2 REV 07/23
Federal Aid Project No: CPFCDSL 5308(025)
CONTR
ACTOR INSTRUCTIONS – PLEASE READ BEFORE SUBMITTING

1. Shutdown and connection requests will not be processed unless a DETAILED CONSTRUCTION DRAWING IS ATTACHED showing the proposed construction plan. (See example below.)

2. Utility shutdown and connection requests must be submitted to the Construction Management & Inspection Project Inspector TWO WEEKS (MIN.) prior to the requested shutdown or connection date.

3. Scheduling: Prior to start of work, there shall be a MINIMUM OF TWO WEEKS NOTICE GIVEN TO CARLSBAD MUNICIPAL WATER DISTRICT.

4. Connections will not be permitted unless passing BACTERIOLOGICAL TEST RESULTS are attached (required for all potable use lines).

5. If the weather or a situation develops where the time of shutdown is not feasible, a new shutdown time shall be resubmitted for approval.

6. All temporary water connections and supply lines shall be approved and accepted by CMWD.

7. Contractor may not operate CMWD VALVES OR APPURTENANCES. Only CMWD representatives are authorized to operate valves and appurtenances.

8. There shall be NO SHUTDOWNS MONDAYS, FRIDAYS, WEEKENDS OR CITY HOLIDAYS.

9. The contractor’s authorized representative (listed on the front) must be onsite during the entire duration of the shutdown. The contractor’s authorized representative must have the authority to act on the company’s behalf.

10. If the contractor has a preferred connection date, please note within this submittal.

11. The City/District reserves the right to change the schedule.

Example of construction plan
E-28 Page 2 of 2 REV 07/23
Federal Aid Project No: CPFCDSL 5308(025)

Appendix C

CALTRANS Local Area Procedures Manual
Exhibit 12-G
Exhibit 12-G
Required Federal-Aid Contract Language
Local Assistance Procedures Manual

Page 1 of 21 ends

October 2023
EXHIBIT 12-G: REQUIRED FEDERAL-AID CONTRACT LANGUAGE
(For Local Assistance Construction Projects)
The fol
lowing language must be incorporated into all Local Assistance Federal-aid construction contracts.

The following language, with minor edits, was taken from the Code of Federal Regulations.

MAINTAI

N RECORDS AND SUBMIT REPORTS DOCUMENTING YOUR PERFORMANCE UNDER THIS

SECTION

1. DISADVANTAGED BUSINESS ENTERPRISES (DBE) ..................................................................................... 2 A. Nondiscrimination Statement ............................................................................................................... 3 B. Contract Assurance ............................................................................................................................... 3 C. Prompt Progress Payment .................................................................................................................... 3 D. Prompt Payment of Withheld Funds to Subcontractors ................................................................... 3 E. Termination and Replacement of DBE Subcontractors..................................................................... 4 F. Commitment and Utilization ................................................................................................................. 6 G. Running Tally of Attainments ............................................................................................................... 7 H. Commercially Useful Function ............................................................................................................. 7 I. Use of Joint Checks .............................................................................................................................. 8

2. BID OPENING ...................................................................................................................................................... 9

3. BID RIGGING ....................................................................................................................................................... 9

4. CONTRACT AWARD ........................................................................................................................................... 9

5. CONTRACTOR LICENSE .................................................................................................................................... 9

6. CHANGED CONDITIONS .................................................................................................................................... 9 A. Differing Site Co nditions ....................................................................................................................... 9 B. Suspensions of Work Ordered by the En gineer ................................................................................. 9 C. Significant Changes in the Character of Work ................................................................................. 10

7. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES ........................................ 10

8. BUY AMERICA ................................................................................................................................................... 10

9. QUALITY ASSURANCE .................................................................................................................................... 11

10. PROMPT PAYMENT .......................................................................................................................................... 12

11. FORM FHWA
-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONTRACTS .......................... 12

12. FEMALE AND MINORITY GOALS .................................................................................................................... 12

13. TITLE VI ASSURANCES.................................................................................................................................... 14

14. FEDERAL TRAINEE PROGRAM ...................................................................................................................... 19

15. PROHIBITION OF CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE EQUIPMENT AND SERVICES .......................................................................................................................................................... 20 Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 2 of 21 ends

October 2023

1. DISADVANTAGED BUSINESS ENTERPRISES (DBE)
The contractor, subrecipient or subcontractor shall take necessary and reasonable steps to ensure that DBEs have opportunity to participate in the contract (49 CFR 26). To ensure equal participation of DBEs provided in 49 CFR 26.5, the Agency shows a contract goal for DBEs. The prime contractor shall make work available to DBEs and select work parts consistent with available DBE subcontractors and suppliers.

The prime contractor shall meet the DBE goal shown elsewhere in these special provisions or demonstrate that they made adequate Good Faith Efforts (GFE) to meet this goal. An adequate GFE means that the bidder must show that it took all necessary and reasonable steps to achieve a DBE goal that, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to meet the DBE goal.

If the DBE goal is not met, the contractor needs to complete and submit the DBE GFE documentation as described in Local Assistance Procedures Manual (LAPM) Chapter 9, Section 9.8 within 5 (five) days of bid opening.

It is the prime contractor’s responsibility to verify that the DBE firm is certified as a DBE on the date of bid opening by using the California Unified Certification Program (CUCP) database and possesses the most specific available North American Industry Classification System (NAICS) codes and Work Code applicable to the type of work the firm will perform on the contract. Additionally, the prime contractor is responsible to document this
verification by printing out the CUCP data for each DBE firm. A list of DBEs certified by the CUCP can be found at: https://dot.ca.gov/programs/civil-rights/dbe-search.

DBE participation will only count toward the California Department of Transportation’s federally mandated statewide overall DBE goal if the DBE performs a commercially useful function under 49 CFR 26.55.

Credit for materials or supplies the prime contractor purchases from DBEs counts towards the goal in the following manner:
• 100 percent counts if the materials or supplies are obtained from a DBE manufacturer. • 60 percent counts if the materials or supplies are obtained from a DBE regular dealer. • Only fees, commissions, and charges for assistance in the procurement and delivery of materials or supplies count if obtained from a DBE that is neither a manufacturer nor regular dealer. 49 CFR 26.55 defines "manufacturer" and "regular dealer."
The prime contractor receives credit towards the goal if they employ a DBE trucking company that performs a commercially useful function as defined in 49 CFR 26.55(d) as follows:
• The DBE must be responsible for the management and supervision of the entire trucking operation for which it is responsible on a particular contract, and there cannot be a contrived arrangement for the purpose of meeting DBE goals.
• The DBE must itself own and operate at least one fully licensed, insured, and operational truck used on the contract.
• The DBE receives credit for the total value of the transportation services it provides on the Contract using trucks it owns, insures, and operates using drivers it employs. • The DBE may lease trucks from another DBE firm, including an owner-operator who is certified as a DBE. The DBE who leases trucks from another DBE receives credit for the total value of the transportation services the lessee DBE provides on the Contract. • The DBE may also lease trucks from a non-DBE firm, including from an owner-operator. The DBE that leases trucks equipped with drivers from a non-DBE is entitled to credit for the total value of transportation services provided by non-DBE leased trucks equipped with drivers not to exceed the value of transportation services on the contract provided by DBE-owned trucks or leased trucks with DBE employee drivers. Additional participation by non-DBE owned trucks equipped with drivers receives credit only for the fee or commission it receives as a result of the lease arrangement. • The DBE may lease trucks without drivers from a non-DBE truck leasing company. If the DBE leases trucks from a non-DBE truck leasing company and uses its own employees as drivers, it is entitled to credit for the total value of these hauling services.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 3 of 21 ends

October 2023
• A lease must indicate that the DBE has exclusive use of and control over the truck. This does not preclude the leased truck from working for others during the term of the lease with the consent of the DBE, so long as the lease gives the DBE absolute priority for use of the leased truck. Leased trucks must display the name and identification number of the DBE.

A. Nondiscrimination Statement
The contractor, subrecipient or subcontractor will never exclude any person from participation in, deny any person the benefits of, or otherwise discriminate against anyone in connection with the award and performance of any contract covered by 49 CFR 26 on the basis of race, color, sex, or national origin. In administering the Local Agency components of the DBE Program Plan, the contractor, subrecipient or subcontractor will not, directly, or through contractual or other arrangements, use criteria or methods of administration that have the effect of defeating or substantially impairing accomplishment of the objectives of the DBE Program Plan with respect to individuals of a particular race, color, sex, or national origin.

B. Contract Assurance
Under 49 CFR 26.13(b): The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR 26 in the award and administration of federal -aid contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may inc lude, but is not limited to:
(1) Withholding monthly progress payments;
(2) Assessing sanctions;
(3) Liquidated damages; and/or
(4) Disqualifying the contractor from future bidding as non-responsible.

C. Prompt Progress Payment
In accordance with California Business and Professions Code section 7108.5, the prime contractor or subcontractor shall pay to any subcontractor, not later than seven days after receipt of each progress payment, unless otherwise agreed to in writing, the respective amounts allowed the contractor on account of the work performed by the subcontractors, to the extent of each subcontractor’s interest therein. In the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the prime contractor or subcontractor to a subcontractor, the prime contractor or subcontractor may withhold no more than 150 percent of the disputed amount. Any violation of this requirement shall constitute a cause for disciplinary action and shall subject the licensee to a penalty, payable to the subcontractor, of 2 percent of the amount due per month for every month that payment is not made.

In any action for the collection of funds wrongfully withheld, the prevailing party shall be entitled to his or her attorney’s fees and costs. The sanctions authorized under this requirement shall be separate from, and in addition to, all other remedies, either civil, administrative, or criminal. This clause applies to both DBE and non - DBE subcontractors.

D. Prompt Payment of Withheld Funds to Subcontractors
The Agency may hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency, of the contract work, and pay retainage to the prime contractor based on these acceptances. The Agency shall designate one of the methods below in the contract to ensure prompt and full payment of any retainage kept by the prime contractor or subcontractor to a subcontractor. The Agency shall include either Method 1, Method 2, or Method 3 below and delete the other two.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 4 of 21 ends

October 2023
Method 3: The Agency shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency of the contract work and pay retainage to the prime contractor
based on these acceptances. The prime contractor or subcontractor shall return all monies withheld in retention from all subcontractors within seven (7) days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the Agency.

Any delay or postponement of payment may take place only for good cause and with the Agency’s prior written approval. Any violation of these provisions shall subject the violating prime contractor or subcontractor
to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor; deficient subcontractor performance and/or noncompliance by a subcontractor. This clause applies to
both DBE and non-DBE subcontractors.

Any vi
olation of these provisions of Prompt Progress Payment and Prompt Payment of Withheld Funds to Subcontractors shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified therein. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the prime contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor.

E. Termination and Replacement of DBE Subcontractors
The prime contractor shall utilize the specific DBEs listed to perform the work and supply the materials for which each is listed unless the contractor obtains the Agency’s written consent. The prime contractor shall not terminate or replace a listed DBE for convenience and perform the work with their own forces or obtain materials from other sources without prior written authorization from the Agency. Unless the Agency’s prior written consent is provided, the contractor shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE on the Exhibit 15-G Construction Contract DBE Commitment form, included in the Bid.

Termination of DBE Subcontractors

After a contract with a specified DBE goal has been executed, termination of a DBE may be allowed for the following, but not limited to, justifiable reasons with prior written authorization from the Agency:

1. Listed DBE fails or refuses to execute a written contract based on plans and specifications for the project.

2. The Local Agency stipulated that a bond is a condition of executing the subcontract and the listed DBE fails to meet the Local Agency’s bond requirements.

3. Work requires a contractor's license and listed DBE does not have a valid license under Contractors License Law, or is not properly registered with the California Department of Industrial Relations as a public works contractor.

4. Listed DBE fails or refuses to perform the work or furnish the listed materials (failing or refusing to Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 5 of 21 ends

October 2023
perform is not an allowable reason to remove a DBE if the failure or refusal is a result of bad faith or discrimination).

5. Listed DBE's work is unsatisfactory and not in compliance with the contract.

6. Listed DBE is ineligible to work on the project because of suspension or debarment.

7. Listed DBE becomes bankrupt or insolvent or exhibits credit unworthiness.

8. Listed DBE voluntarily withdraws with written notice from the Contract

9. Listed DBE is ineligible to receive credit for the type of work required.

10. Listed DBE owner dies or becomes disabled resulting in the inability to perform the work on the Contract.

11. The Agency determines other documented good cause.

To term
inate a DBE or to terminate a portion of a DBE's work, the contractor must use the following procedures:

1. Send a written notice to the DBE of Contractor’s intent to use other forces or material sources and include one or more justifiable reasons listed above. Simultaneously send a copy of this written notice to the Agency. The written notice to the DBE must request they provide any response within five (5) business days to both the Contractor and the Agency by either acknowledging their agreement or documenting their reasoning as to why the use of other forces or sources of materials should not occur.

2. If the DBE does not respond within 5 business days, Contractor may move forward with the request as if the DBE had agreed to Contractor’s written notice.

3. Submit Contractor’s DBE termination request by written letter to the Agency and include:
• One or more above listed justifiable reasons along with supporting documentation. • Contractor’s written notice to the DBE regarding the request, including proof of transmission and tracking documentation of Contractor’s written notice
• The DBE's response to Contractor’s written notice, if received. If a written response was not provided, provide a statement to that effect.

The Agency
shall respond in writing to Contractor’s DBE termination request within 5 business days.

Replacement of DBE Subcontractors
After receiving the Agency’s written authorization of DBE termination request, the Contractor must obtain the Agency’s written agreement for DBE replacement. The Contractor must find or demonstrate GFEs to find qualified DBE replacement firms to perform the work to the extent needed to meet the DBE commitment.

The fol
lowing procedures shall be followed to request authorization to replace a DBE firm:

1. Submit a request to replace a DBE with other forces or material sources in writing to the Agency which must include:
a. Desc ription of remaining uncommitted work items made available for replacement DBE solicitation and participation.
b. The proposed DBE replacement firm's business information, the work they have agreed to perform, and the following:
• Quote for bid item work and description of work to be performed • Proposed subcontract agreement and written confirmation of agreement to perform on the Contract
• Revised Subcontracting Request form
• Revised Exhibit 15-G: Construction Contract DBE Commitment

2. If Contractor has not identified a DBE replacement firm, submit documentation of the Contractor’s GFEs Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 6 of 21 ends

October 2023
to use DBE replacement firms within 7 days of Agency's authorization to terminate the DBE. The Contractor may request the Agency's approval to extend this submittal period to a total of 14 days.

Submit documentation of actions taken to find a DBE replacement firm, such as:
• Search results of certified DBEs available to perform the original DBE work identified and/or other work the Contractor had intended to self-perform, to the extent needed to meet the DBE commitment
• Solicitations of DBEs for performance of work identified • Correspondence with interested DBEs that may have included contract details and requirements • Negotiation efforts with DBEs that reflect why an agreement was not reached • If a DBE's quote was rejected, provide Contractor’s reasoning for the rejection, such as why the DBE was unqualified for the work, or why the price quote was unreasonable or excessive • Copies of each DBE's and non-DBE's price quotes for work identified, as the Agency may contact the firms to verify solicitation efforts and determine if the DBE quotes are substantially higher • Additional documentation that supports the GFE
The Agency shall respond in writing to the Contractor’s DBE replacement request within five (5) business days.

The Contractor must submit a revised Subcontracting Request form if the replacement plan is authorized by the Agency.

F. Commitment and Utilization
The Agency’s DBE program must include a monitoring and enforcement mechanism to ensure that DBE commitments reconcile to DBE utilization.

The bidder shall complete and sign Exhibit 15-G: Construction Contract DBE Commitment included in the contract documents regardless of whether DBE participation is reported. The bidder shall provide written confirmation from each DBE that the DBE is participating in the Contract. LAPM Exhibit 9- I: DBE Confirmation or equivalent form and DBE’s quote must be submitted. The written confirmation must be submitted no later than 4pm on the 5th day after bid opening. If a DBE is participating as a joint venture partner, the bidder shall submit a copy of the joint venture agreement.

If the DBE Commitment form, Exhibit 15-G, is not submitted with the bid, it must be completed and submitted by all bidders to the Agency within five (5) days of bid opening. If the bidder does not submit the DBE Commitment form within the specified time, the Agency will find the bidder’s bid nonresponsive.

The prime contractor shall use each DBE subcontractor as listed on Exhibit 15-G: Construction Contract DBE Commitment unless they receive written authorization for a termination or replacement from the Agency.

The Agency shall request the prime contractor to:

1. Notify the Resident Engineer or Inspector of any changes to its anticipated DBE participation

2. Provide this notification before starting the affected work

3. Maintain records including:
• Name and business address of each 1st-tier subcontractor • Name and business address of each DBE subcontractor, DBE vendor, and DBE trucking company, regardless of tier
• Date of payment and total amount paid to each DBE (see Exhibit 9-F: Monthly Disadvantaged Business Enterprise Payment)
If the prime contractor is a DBE contractor, they shall include the date of work performed by their own forces and the corresponding value of the work.

Before the 15th of each month, the prime contractor shall submit a Monthly DBE Trucking Verification (LAPM Exhibit 16-Z1) form.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 7 of 21 ends

October 2023
If a DBE is decertified before completing its work, the DBE must notify the prime contractor in writing of the decertification date. If a business becomes a certified DBE before completing its work, the business must notify the prime contractor in writing of the certification date. The prime contractor shall submit the notifications. Upon work completion, the prime contractor shall complete a Disadvantaged Business Enterprises (DBE) Certification Status Change, Exhibit 17-O, form and submit the form within 30 days of contract acceptance.

Upon work completion, the prime contractor shall complete Exhibit 17-F: Final Report – Utilization of Disadvantaged Business Enterprises (DBE), First-Tier Subcontractors and submit it within 90 days of contract acceptance. The Agency will withhold $10,000 until the form is submitted. The Agency releases the withhold upon submission of the completed form.

G. Running Tally of Attainments
For projects awarded on or after March 1, 2020, but before September 1, 2023:

After submitting an invoice for reimbursement that includes a payment to a DBE, but no later than the 10th of the following month, the prime contractor/consultant must complete and email the Exhibit 9- F: Disadvantaged Business Enterprise Running Tally of Payments to [email protected] with a copy to local administering agencies.

For projects that are awarded on or after September 1, 2023:

Exhibit 9-F is no longer required. Instead, by the 15th of the month following the month of any payment(s), the prime contractor must now submit Exhibit 9-P to the Local Agency administering the contract. If the Contractor does not make any payments to subcontractors, supplier(s) and/or manufacturers they must report “no payments were made to subs this month” and write this visibly and legibly on Exhibit 9- P.

H. Commercially Useful Function
DBEs must perform a commercially useful function (CUF) under 49 CFR 26.55 when performing work or supplying materials listed on the DBE Commitment form. The DBE value of work will only count toward the DBE commitment if the DBE performs a CUF. A DBE performs a CUF when it is responsible for execution of the work on the contract and is carrying out its responsibilities by actually performing, managing, and supervising the work involved. If a DBE does not perform or exercise responsibility for at least 30% of the total cost of its contract with its own work force, or the DBE subcontracts a greater portion of the work of a contract than would be expected on the basis of normal industry practice for the type of work involved, it will be presumed that the DBE is not performing a CUF. Additionally, the DBE must also be responsible, with respect to materials and supplies used on the contract, for negotiating price, determining quality and quantity, ordering the material and installing (where applicable), and paying for the material itself.

The Contractor must perform CUF evaluation for each DBE company working on a federal -aid contract, with or without a DBE goal. Perform a CUF evaluation at the beginning of the DBE’s work, and continue to monitor the performance of CUF for the duration of the project.

The Contractor must provide written notification to the AGENCY at least 15 days in advance of each DBE's initial performance of work or supplying materials for the Contract. The notification must include the DBE's name, work the DBE will perform on the contract, and the location, date, and time of where their work will take place.

Within 10 (ten) days of a DBE initially performing work or supplying materials on the contract, the Contractor shall submit to the LPA the initial evaluation and validation of DBE performance of a CUF using the LAPM 9- J:

Disadvantaged Business Enterprise Commercially Useful Function Evaluation. Include the following information with the submittal:
• Subcontract agreement with the DBE
• Purchase orders
• Bills of lading
• Invoices
• Proof of payment
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 8 of 21 ends

October 2023
The Contractor must monitor all DBE’s performance of CUF by conducting quarterly evaluations and validations throughout their duration of work on the contract using the LAPM 9-J: DBE Commercially Useful Function Evaluation. The Contractor must submit to the AGENCY these quarterly evaluations and validations by the 5 th of the month for the previous three (3) months of work.

The Contractor must notify the AGENCY immediately if the Contractor believes the DBE may not be performing a CUF.

The AGENCY will verify DBEs performance of CUF by reviewing the initial and quarterly submissions of LAPM 9-J: DBE Commercially Useful Function Evaluation, submitted supporting information, field observations, and through any additional AGENCY evaluations. The AGENCY must evaluate DBEs and their CUF performance throughout the duration of a Contract. The AGENCY will provide written notice to Contractor and DBE at least two (2) business days prior to any evaluation. The Contractor and DBE must participate in the evaluation. Upon completing the evaluation, the AGENCY must share the evaluation results with the Contractor and DBE. An evaluation could include items that must be remedied upon receipt. If the AGENCY determines the DBE is not performing a CUF the Contractor must suspend performance of the noncompliant work.

The Contractor and DBEs must submit any additional CUF related records and documents within five (5) business days of AGENCY’s request such as:
• Proof of ownership or lease and rental agreements for equipment • Tax records
• Employee rosters
• Certified payroll records
• Inventory rosters
Failure to submit required DBE Commercially Useful Function Evaluation forms or requested records and documents can result in withholding of payment for the value of work completed by the DBE.

If the Contractor and/or the AGENCY determine that a listed DBE is not performing a CUF in performance of their DBE committed work, immediately suspend performance of the noncompliant portion of the work. The AGENCY may deny payment for the noncompliant portion of the work. The AGENCY will ask the Contractor to submit a corrective action plan (CAP) to the AGENCY within five (5) days of the noncompliant CUF determination. The CAP must identify how the Contractor will correct the noncompliance findings for the remaining portion of the DBE's work. The AGENCY has five (5) days to review the CAP in conjunction with the prime contractor’s review. The Contractor must implement the CAP within five (5) days of the AGENCY's approval. The AGENCY will then authorize the prior noncompliant portion of work for the DBE's committed work.

If corrective actions cannot be accomplished to ensure the DBE performs a CUF on the Contract, then the Contractor may have good cause to request termination of the DBE.

I. Use of Joint Checks
A joint check may be used between the Contractor or lower-tier subcontractor and a DBE subcontractor purchasing materials from a material supplier if the contractor obtains prior approval from the LPA for the proposed use of joint check upon submittal of the LAPM 9-K: DLA Disadvantaged Business Enterprises (DBE) Joint Check Agreement Request form.

To use a jo
int check, the following conditions must be met:
• All parties, including the Contractor, must agree to the use of a joint check • Entity issuing the joint check acts solely to guarantee payment • DBE must release the check to the material supplier
• LPA must authorize the request before implementation
• Any party to the agreement must provide requested documentation within 10 days of the LPA's request for the documentation
• Agreement to use a joint check must be short-term, not to exceed 1 year, allowing sufficient time needed to establish or increase a credit line with the material supplier Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 9 of 21 ends

October 2023
A request for a joint check agreement may be initiated by any party. If a joint check is used, the DBE remains responsible for all elements of 49 CFR 26.55(c)(1).

Failure to comply with the above requirements disqualifies DBE participation and results in no credit and no payment to the Contractor for DBE participation.

A joint check may not be used between the Contractor or subcontractor and a DBE regular dealer, bulk material supplier, manufacturer, wholesaler, broker, trucker, packager, manufacturer’s representative, or other persons who arrange or expedite transactions.

2. BID OPENING
The Agency publicly opens and reads bids at the
time and place shown on the Notice to Contractors.

3. BID RIGGING
The U.S. Department of Transportation (DOT) provides a toll-free hot line to report bid rigging activities. Use the
hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number is (800) 424- 9071. The service is available 24 hours 7 days a week and is confidential and anonymous. The hotline is part of the DOT's effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General.

4. CONTRACT AWARD
If the Agency awar
ds the contract, the award is made to the lowest responsible and responsive bidder.

5. CONTRACTOR LICENSE
The Contractor must be properly licensed as a contractor from contract award through Contract acceptance (23 CFR
635.110).

6. CHANGED CONDITIONS
A. Differing Site Conditions

1. During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed.

2. Upon written notification, the engineer will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The engineer will notify the contractor of the determination whether or not an adjustment of the contract is warranted.

3. No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor has provided the required written notice.

4. No contract adjustment will be allowed under this clause for any effects caused on unchanged work. [This provision may be omitted by the Local Agency, at their option.] B. Suspensions of Work Ordered by the Engineer

1. If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment.

2. Upon receipt, the engineer will evaluate the contractor's request. If the engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make an adjustment (excluding profit) and modify the contract in writing accordingly. The contractor will be notified of the engineer's determination whether or not an adjustment of the contract is warranted.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 10 of 21 ends

October 2023

3. No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed.

4. No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract.

C. Significant Changes in the Character of Work

1. The engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered.

2. If the alterations or changes in quantities significantly change the character of the work under the contract, whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair and equitable.

3. If the alterations or changes in quantities do not significantly change the character of the work to be performed under the contract, the altered work will be paid for as provided elsewhere in the contract.

4. The term “significant change” shall be construed to apply only to the following circumstances:
• When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction; or
• When a major item of work, as defined elsewhere in the contract, is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in case of a decrease below 75 percent, to the actual amount of work performed.

7. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES The Contractor shall begin work within 15 calendar days after the issuance of the Notice to Proceed.

This work shall be diligently prosecuted to completion before the expiration of 260 WORKING DAYS beginning on the fifteenth calendar day after the date shown on the Notice to Proceed.

The Contractor shall pay to the city of Carlsbad fifteen hundred dollars in the sum of $1,500 per day, for each and every calendar days’ delay in finishing the work in excess of the number of working days prescribed above.

8. BUY AMERICA
Buy America Requirements apply to steel and iron, manufactured products, and construction materials permanently incorporated into the project.

Steel and Iron Materials
All steel and iron materials must be melted and manufactured in the United States except:

1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials [60 Fed Reg 15478 (03/24/1995)];

2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total contract amount or $2,500, materials produced outside the United States may be used if authorized.

Furnish steel and iron materials to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured. All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coat ing is applied.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 11 of 21 ends

October 2023
Manufactured Products
Iron and steel used in precast concrete manufactured products must meet the requirements of the above section (Steel and Iron Materials) regardless of the amount used. Iron and steel used in other manufactured products must meet the requirements of the above section (Steel and Iron Materials) if the weight of steel and iron components constitute 90 percent or more of the total weight of the manufactured product.

Construction Materials
Buy America requirements apply to the following construction materials that are or consist primarily of:

1. Non-ferrous metals

2. Plastic and polymer-based products such as:

2.1 Polyvinylchloride

2.2 Composite Building Materials

3. Glass

4. Fiber optic cable (including drop cable)

5. Optical fiber

6. Lumber

7. Engineered wood

8. Drywall
All manufacturing processes for these materials as defined in 2 CFR 184.6 must occur in the United States.

Where one or more of these construction materials have been combined by a manufacturer with other materials through a manufacturing process, Buy America requirements do not apply unless otherwise specified.

Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer’s certificate of compliance must identify where the construction material was manufactured and attest specifically to Buy America compliance.

All manufacturing processes for these materials must occur in the United States.

Buy America requirements do not apply to the following:

1. Tools and construction equipment used in performing the work

2. Temporary work that is not incorporated into the finished project Waivers
If Buy America waivers are granted, use the following language to include in the contract:

The following steel and iron products, manufactured products, or construction materials have received an approved Buy America waiver for this contract, and therefore, are not subject to Buy America requirements:

1. _______________________________

2. _______________________________

9. QUALITY ASSURANCE
The Local Agency uses a Quality Assurance Program (QAP) to ensure a material is produced to comply with the Contract. The Local Agency may examine the records and reports of tests the prime contractor performs if they are available at the job site. Schedule work to allow time for QAP.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 12 of 21 ends

October 2023

10. PROMPT PAYMENT
A. FROM THE AGENCY TO THE CONTRACTORS
The Loca
l Agency shall make all project progress payment within 30 days after receipt of an undisputed and properly submitted payment request from the Contractor on a construction contract. If the Local Agency fails to pay promptly, the Local Agency shall pay interest to the Contractor, which accrues at the rate of 10 percent per annum on the principal amount of a money judgment remaining unsatisfied and pro- rated as necessary. Upon receipt of the payment request, the Local Agency shall act in accordance wi th both of the following:

1. The Local Agency shall review each payment request as soon as feasible after receipt to verify it is a proper payment request.

2. The Local Agency must return any payment request deemed improper by the Local Agency to the Contractor as soon as feasible, but not later than seven (7) days, after receipt. A request returned pursuant to this paragraph shall include documentation setting forth in writing the reasons why it is an improper payment request.

B. SUBMITTAL OF EXHIBIT 9-P
For projects awarded on or after September 1, 2023:

The Contractor must submit Exhibit 9-P to the Local Agency administering the contract by the 15th of the month following the month of any payment(s). If the Contractor does not make any payments to subcontractors, supplier(s) and/or manufacturers they must report “no payments were made to subs this month” and write this visibly and legibly on Exhibit 9-P.

The Local Agency must verify all Exhibit 9-P information, monitor compliance with prompt payment requirements for DBE and non-DBE firms, and address any shortfall to the DBE commitment and prompt payment issues until the end of the project. The Local Agency must email a copy of Exhibit 9- P to [email protected] before the end of the month after receiving the Exhibit 9-P from the Contractor.

11. FORM FHWA-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONTRACTS [Form FHWA-1273 must be physically inserted into the contract without modification, excluding ATTACHMENT

A - EMPLOYMENT AND MATERIALS PREFERENCE FOR APPALACHIAN DEVELOPMENT HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS ROAD CONTRACTS.]
[The cur
rent version of Form FHWA-1273 is accessible at FHWA’s website:
https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf]

12. FEMALE AND MINORITY GOALS
To comply with Section II, "Nondiscrimination," of "Required Contract Provisions Federal -Aid Construction Contracts," the following are for female and minority utilization goals for Federal-aid construction contracts and subcontracts that exceed $10,000:

The nationwide goal for female utilization is 6.9 percent.

The goals for minority utilization (45 Fed Reg 65984 (10/3/1980)) are as follows:

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 13 of 21 ends

October 2023

MINORITY UTILIZATION GOALS
Economic
Area
Goal
(Percent)
174
Redding CA:

Non-SMSA (Standard Metropolitan Statistical Area) Counties:

CA Lassen; CA Modoc; CA Plumas; CA Shasta; CA Siskiyou; CA Tehama

6.8 175
Eureka, CA
Non-SMSA Counties:

CA Del Norte; CA Humboldt; CA Trinity

6.6 San Francisco-Oakland-San Jose, CA:

28.9 25.6

19.6 14.9

9.1 17.1

23.2 SMSA Counties:
7120 Salinas-Seaside-Monterey, CA
CA Monterey
7360 San Francisco-Oakland
CA Alameda; CA Contra Costa; CA Marin; CA San Francisco; CA San Mateo 7400 San Jose, CA
176 CA Santa Clara, CA
7485 Santa Cruz, CA
CA Santa Cruz
7500 Santa Rosa
CA Sonoma
8720 Vallejo-Fairfield-Napa, CA
CA Napa; CA Solano
Non-SMSA Counties:

CA Lake; CA Mendocino; CA San Benito
177
Sacramento, CA:

SMSA Counties:
6920 Sacramento, CA
CA Placer; CA Sacramento; CA
Yolo Non-SMSA Counties
CA Butte; CA Colusa; CA El Dorado; CA Glenn; CA Nevada; CA Sierra; CA Sutter; CA Yuba

16.1 14.3
Stockton-Modesto, CA:

SMSA Counties:
5170 Modesto, CA 12.3
178 CA Stanislaus
8120 Stockton, CA 24.3
CA San Joaquin
Non-SMSA Counties 19.8
CA Alpine; CA Amador; CA Calaveras; CA Mariposa; CA Merced; CA Tuolumne Fresno-Bakersfield, CA
SMSA Counties:
179 0680 Bakersfield, CA 19.1
CA Kern
2840 Fresno, CA
CA Fresno
Non-SMSA Counties:

CA Kings; CA Madera; CA Tulare

26.1 23.6
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 14 of 21 ends

October 2023
Los Angeles, CA:

11.9 28.3

21.5 19.0

19.7 24.6
SMSA Counties:
0360 Anaheim-Santa Ana-Garden Grove, CA
CA Orange
4480 Los Angeles-Long Beach, CA
CA Los Angeles
180 6000 Oxnard-Simi Valley-Ventura, CA
CA Ventura
6780 Riverside-San Bernardino-Ontario, CA
CA Riverside; CA San Bernardino
7480 Santa Barbara-Santa Maria-Lompoc, CA
CA Santa Barbara
Non-SMSA Counties
CA Inyo; CA Mono; CA San Luis Obispo
San Diego, CA:

16.9 18.2
SMSA Counties
181 7320 San Diego, CA
CA San Diego
Non-SMSA Counties
CA Imperial
For the last full week of July during which work is performed under the contract, the prime contractor and each non material-supplier subcontractor with a subcontract of $10,000 or more must complete Form FHWA PR -1391 (Appendix C to 23 CFR 230). Submit the forms by August 15.

13. TITLE VI ASSURANCES
[The U.S. Department of Transportation Order No.1050.2A requires all federal-aid Department of Transportation contracts between an agency and a contractor to contain Appendix A and E.

Note: Appendix B only requires inclusion if the contract impacts deeds effecting or recording the transfer of real property, structures, or improvements thereon, or granting interest therein. Appendices C and D only require inclusion if the contract impacts deeds, licenses, leases, permits, or similar instruments entered into by the recipient.] APPEN
DIX A
Duri
ng the performance of this Agreement, the contractor, for itself, its assignees and successors in interest (hereinafter collectively referred to as CONTRACTOR) agrees as follows:
a. Compliance with Regulations: CONTRACTOR shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the REGULATIONS), which are herein incorporated by reference and made a part of this agreement. b. Nondiscri mination: CONTRACTOR, with regard to the work performed by it during the AGREEMENT, shall not discriminate on the grounds of race, color, sex, national origin, religion, age, or disability in the selection and retention of sub-applicants, including procurements of materials and leases of equipment. CONTRACTOR shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the agreement covers a program set forth in Appendix B of the Regulations. c. Solicitations for Sub-agreements, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by CONTRACTOR for work to be performed under a Sub- agreement, including procurements of materials or leases of equipment, each potential sub-applicant or supplier shall be notified by CONTRACTOR of the CONTRACTOR’S obligations under this Agreement and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin.
d. Information and Reports: CONTRACTOR shall provide all information and reports required by the Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 15 of 21 ends

October 2023
Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the recipient or FHWA to be pertinent to ascertain compliance with such Regulations or directives. Where any information required of CONTRACTOR is in the exclusive possession of another who fails or refuses to furnish this information, CONTRACTOR shall so certify to the recipient or FHWA as appropriate, and shall set forth what efforts CONTRACTOR has made to obtain the information. e. Sanctions for Noncompliance: In the event of CONTRACTOR’s noncompliance with the nondiscrimination provisions of this agreement, the recipient shall impose such agreement sanctions as it or the FHWA may determine to be appropriate, including, but not limited to:
i. withholding of payments to CONTRACTOR under the Agreement within a reasonable period of time, not to exceed 90 days; and/or
ii. cancellation, termination or suspension of the Agreement, in whole or in part. f. Incorporation of Provisions : CONTRACTOR shall include the provisions of paragraphs (1) through (6) in every sub-agreement, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto.

CONTRACTOR shall take such action with respect to any sub-agreement or procurement as the recipient or FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance, provided, however, that, in the event CONTRACTOR becomes involved in, or is threatened with, litigation with a sub- applicant or supplier as a result of such direction, CONTRACTOR may request the recipient enter into such litigation to protect the interests of the State, and, in addition, CONTRACTOR may request the United States to enter into such litigation to protect the interests of the United States.

APPENDIX B

CLAUSES FOR DEEDS TRANSFERRING UNITED STATES PROPERTY
The following clauses will be included in deeds effecting or recording the transfer of real property, structures, or improvements thereon, or granting interest therein from the United States pursuant to the provisions of Assurance 4:

NOW THEREFORE, the U.S. Department of Transportation as authorized by law and upon the condition that the recipient will accept title to the lands and maintain the project constructed thereon in accordance with Title 23 U.S.C., the regulations for the administration of the preceding statute, and the policies and procedures prescribed by the FHWA of the U.S. Department of Transportation in accordance and in compliance with all requirements imposed by Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation pertaining to and effectuating the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252; 42 U.S.C. § 2000d to 2000d-4), does hereby remise, release, quitclaim and convey unto the recipient all the right, title and interest of the U.S. Department of Transportation in and to said lands described in Exhibit A attached hereto and made a part hereof.
(HABENDUM CLAUSE)
TO HAVE AND TO HOLD said lands and interests therein unto the recipient and its successors forever, subject, however, to the covenants, conditions, restrictions and reservations herein contained as follows, which will remain in effect for the period during which the real property or structures are used for a purpose for which Federal financial assistance is extended or for another purpose involving the provision of similar services or benefits and will be binding on the recipient, its successors and assigns. The recipient, in consideration of the conveyance of said lands and interest in lands, does hereby covenant and agree as a covenant running with the land for itself, its successors and assigns, that (1) no person will on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination with regard to any facility located wholly or in part on, over, or under such lands hereby conveyed [,] [and]* (2) that the recipient will use the lands and interests in lands and interest in lands so conveyed, in compliance with all requirements imposed by or pursuant to Title 49, Code of Federal Regulations, U.S. Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Non- discrimination in Federally-assisted programs of the U.S. Department of Transportation, Effectuation of Title Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 16 of 21 ends

October 2023
VI of the Civil Rights Act of 1964, and as said Regulations and Acts may be amended[, and (3) that in the event of breach of any of the above-mentioned non-discrimination conditions, the Department will have a right to enter or re-enter said lands and facilities on said lands, and that above described land and facilities will thereon revert to and vest in and become the absolute property of the U.S. Department of Transportation and its assigns as such interest existed prior to this instruction].* (*R
everter clause and related language to be used only when it is determined that such a clause is necessary in order to make clear the purpose of Title VI.)

APPENDIX C

CLAUSES FOR TRANSFER OF REAL PROPERTY ACQUIRED OR IMPROVED UNDER THE

ACTIVITY, FACILITY, OR PROGRAM
The following clauses will be included in deeds, licenses, leases, permits, or similar instruments entered into by the recipient pursuant to the provisions of Assurance 7(a):

A. The (grantee, lessee, permittee, etc. as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest, and assigns, as a part of the consideration hereof, does hereby covenant and agree [in the case of deeds and leases add “as a covenant running with the land”] that:

1. In the event facilities are constructed, maintained, or otherwise operated on the property described in this (deed, license, lease, permit, etc.) for a purpose for which a U.S. Department of Transportation activity, facility, or program is extended or for another purpose involving the provision of similar services or benefits, the (grantee, licensee, lessee, permittee, etc.) will maintain and operate such facilities and services in compliance with all requirements imposed by the Acts and Regulations (as may be amended) such that no person on the grounds of race, color, or national origin, will be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities.

B. With respect to licenses, leases, permits, etc., in the event of breach of any of the above Non- discrimination covenants, the recipient will have the right to terminate the (lease, license, permit, etc.) and to enter, re-enter, and repossess said lands and facilities thereon, and hold the same as if the (lease, license, permit, etc.) had never been made or issued.*
C. With respect to a deed, in the event of breach of any of the above Non-discrimination covenants, the recipient will have the right to enter or re-enter the lands and facilities thereon, and the above described lands and facilities will there upon revert to and vest in and become the absolute property of the recipient and its assigns.*
(*Reverter clause and related language to be used only when it is determined that such a clause is necessary to make clear the purpose of Title VI.)
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 17 of 21 ends

October 2023

APPENDIX D

CLAUSES FOR CONSTRUCTION/USE/ACCESS TO REAL PROPERTY ACQUIRED UNDER THE

ACTIVITY, FACILITY OR PROGRAM
The following clauses will be included in deeds, licenses, permits, or similar instruments/agreements entered into by the recipient pursuant to the provisions of Assurance 7(b):

A. The (grantee, licensee, permittee, etc., as appropriate) for himself/herself, his/her heirs, personal representatives, successors in interest ,and assigns, as a part of the consideration hereof, does hereby covenant and agree (in the case of deeds and leases add, “as a covenant running with the land”) that (1) no person on the ground of race, color, or national origin, will be excluded from participation in, denied the benefits of, or be otherwise subjected to discrimination in the use of said facilities, (2) that in the construction of any improvements on, over, or under such land, and the furnishings of services thereon, no person on the ground of race, color, or national origin, will be excluded from participation in, denied the benefits or, or otherwise be subjected to discrimination, (3) that the (grantee, licensee, lessee, p ermittee, etc.) will use the premises in compliance with all other requirements imposed by or pursuant to the Acts and Regulations, as amended, set forth in this Assurance.

B. With respect to (licenses, leases, permits, etc.) in the event of breach of any of the above of the above Non-discrimination covenants, the recipient will have the right to terminate the (license, permits, etc., as appropriate) and to enter or re-enter and repossess said land and the facilities thereon, and hold the same as if said (license, permit, etc., as appropriate) had never been made or issued.* C. With respect to deeds, in the event of breach of any of the above Non-discrimination covenants, the recipient will there upon revert to and vest in and become the absolute property of the recipient and its assigns.
(*Reverter clause and related language to be used only when it is determined that such a clause is necessary to make clear the purpose of Title VI.)

APPENDIX E
During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “contractor”) agrees to comply with the following non- discrimination statutes and authorities, including, but not limited to:

Pertinent Non-Discrimination Authorities:
• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);
• Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), prohibits discrimination on the basis of sex; • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CR Part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), prohibits discrimination on the basis of age);
• Airport and Airway Improvement Act of 1982, (49 U.S.C. § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 18 of 21 ends

October 2023
programs or activities are Federally funded or not);
• Titles II and III of the Americans with Disabilities Act, which prohibit discrimination of the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodatio n, and certain testing entities (42 U.S.C. §§ 12131 – 12189) as implemented by Department of Transportation regulations 49 C.F.R. parts 37 and 38;
• The Federal Aviation Administration’s Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); • Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low - Income Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations;
• Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); • Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 19 of 21 ends

October 2023
Federal Trainee Program Special Provisions
(to be used when applicable)

14. FEDERAL TRAINEE PROGRAM
For the Federal training program, the number of trainees or apprentices is .

This section applies if a number of trainees or apprentices is shown on the Notice of Bidders.

As part of the prime contractor’s equal opportunity affirmative action program, provide on- the-job training to develop full journeymen in the types of trades or job classifications involved.

The prime contractor has primary responsibility for meeting this training requirement.

If the prime contractor subcontracts a contract part, they shall determine how many trainees or apprentices are to be trained by the subcontractor. Include these training requirements in each subcontract.

Where feasible, 25 percent of apprentices or trainees in each occupation must be in their 1st year of apprenticeship or training.

Distribute the number of apprentices or trainees among the work classifications on the basis of the prime contractor’s needs and the availability of journeymen in the various classifications within a reasonable recruitment area.

Before starting work, the prime contractor shall submit to the City/County of :

1. Number of apprentices or trainees to be trained for each classification

2. Training program to be used

3. Training starting date for each classification
The prime contractor shall obtain the City/County of approval for this submitted information before the prime contractor starts work. The City/County of credits the prime contractor for each apprentice or trainee the prime contractor employs on the job who is currently enrolled or becomes enrolled in an approved program.

The primary objective of this section is to train and upgrade minorities and women toward journeym an status.

The prime contractor shall make every effort to enroll minority and women apprentices or trainees, such as conducting systematic and direct recruitment through public and private sources likely to yield minority and women apprentices or trainees, to the extent they are available within a reasonable recruitment area and show that they have made the efforts. In making these efforts, the prime contractor shall not discriminate against any applicant for training.

The prime contractor shall not employ as an apprentice or trainee an employee:

1. In any classification in which the employee has successfully completed a training course leading to journeyman status or in which the employee has been employed as a journeyman

2. Who is not registered in a program approved by the US Department of Labor, Bureau of Apprenticeship and Training
The prime contractor shall ask the employee if the employee has successfully completed a training course leading to journeyman status or has been employed as a journeyman. The prime contractor’s records must show the employee's answers to the questions.

In the training program, the prime contractor shall establish the minimum length and training type for each classification. The City/County of and FHWA approves a program if one of the following is met:

1. It is calculated to:
• Meet the equal employment opportunity responsibilities • Qualify the average apprentice or trainee for journeyman status in the classification involved by the end of the training period

2. It is registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training, and it is administered in a way consistent with the equal employment responsibilities of Federal-aid highway construction contracts
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 20 of 21 ends

October 2023
The prime contractor shall obtain the State's approval for their training program before they start work involving the classification covered by the program.

The prime contractor shall provide training in the construction crafts, not in clerk -typist or secretarial-type positions. Training is allowed in lower-level management positions such as office engineers, estimators, and timekeepers if the training is oriented toward construction applications. Training is allowed in the laborer classification if significant and meaningful training is provided and approved by the division office. Off-site training is allowed if the training is an integral part of an approved training program and does not make up a significant part of the overall training.

The City/County of reimburses the prime contractor 80 cents per hour of training given an employee on this contract under an approved training program:

1. For on-site training

2. For off-site training if the apprentice or trainee is currently employed on a Federal-aid project and prime contractor does at least one of the following:
a. Contribute to the cost of the training
b. Provide the instruction to the apprentice or trainee c. Pay the apprentice's or trainee's wages during the off-site training period

3. If the prime contractor complies with this section.

Each apprentice or trainee must:

1. Begin training on the project as soon as feasible after the start of work involving the apprentice's or trainee's skill

2. Remain on the project as long as training opportunities exist in the apprentice's or trainee's work classification or until the apprentice or trainee has completed the training program Furnish the apprentice or trainee a:

1. Copy of the training plan approved by the U.S, Department of Labor or a training plan for trainees approved by both Caltrans and FHWA

2. Certification showing the type and length of training satisfactorily completed Maintain records and submit reports documenting contractor’s performance under this section.

15. PROHIBITION OF CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE EQUIPMENT AND

SERVICES
In response to significant national security concerns, the agency shall check the prohibited vendor list before making any telecommunications and video surveillance purchase because recipients and subrecipients of federal funds are prohibited from obligating or expending loan or grant funds to:
• Procure or obtain;
• Extend or renew a contract to procure or obtain; or
• Enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.

The prohibited vendors (and their subsidiaries or affiliates) are:
• Huawei Technologies Company;
• ZTE Corporation;
• Hytera Communications Corporation;
• Hangzhou Hikvision Digital Technology Company;
• Dahua Technology Company; and
• Subsidiaries or affiliates of the above-mentioned companies.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015 Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language

Page 21 of 21 ends

October 2023
In implementing the prohibition, the agency administering loan, grant, or subsidy programs shall prioritize available funding and technical support to assist affected businesses, institutions and organizations as is reasonably necessary for those affected entities to transition from covered communications equipment and services, to procure replacement equipment and services, and to ensure that communications service to users and customers is sustained.

The contractors should furnish telecommunications and video surveillance equipment with a certificate of compliance. The certificate must state telecommunications and video surveillance equipment was not procured or obtained from manufacturers identified in the above list.

Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Amount
Subcontracted

DIR Reg Number

A
A
A
A
A
A
A
A

I
I
I
I
I
I
I
I
I
Local Assistance Procedures Manual Exhibit 12-B
Bidder’s List of Subcontractors (DBE and Non- DBE)
Exhibit 12-B: Bidder’s List of Subcontractor (DBE and Non-DBE) - Part 1 As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts must be registered with the State Division of Industrial Relations and certified to bid on Public Works contracts. Please register at h ttps://www.dir.ca.gov/Public-Works/Contract or- Registration.html. The local agency will verify registration of all contractors and subcontractors on public works projects at bid and thereafter annually to assure that yearly registration is maintained throughout the life of the projec t.

In accordance with Title 49, Section 26.11 of the Code of Federal Regulations, and Section 4104 of the Public Contract Code of the State of California, as amended, the following information is required for each sub-contractor who will perform work amounting to more than one half of one percent (0.5%) of
the
Total Base Bid or $10,000 (whichever is greater).

FEDERAL PROJECT NUMBER:

Photocopy this form for additional f irms.

Subcontractor Name & Location Line Item & Description Subcontract Percentage of Bid Item
Contractor License Number DBE
(Y/N) DBE Cert Number Annual Gross Receipts
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
ge of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
Age of Firm in
years
Distribution – Original: Local Agency File; Copy: DLAE w/Award Package

Page 1 of 2 ends

September 2021
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Ag
Ag
Ag
Ag
Ag
Ag
Ag
Ag

I

I

I

I

I

I

I

I

I

Local Assistance Procedures Manual Exhibit 12-B
Bidder’s List of Subcontractors (DBE and Non- DBE)
Exhibit 12-B: Bidder’s List of Subcontractor (DBE and Non-DBE) - Part 2 In accordance with Title 49, Section 26 of the Code of Federal Regulations, the Bidder shall list all subcontractors who provided a quote or bid but were not selected to participate as a subc
ontractor on this project.

FEDERAL PROJECT NUMBER:

Photocopy this form for additional f irms.

Subcontractor Name & Location Line Item & Description Subcontract Amount
Percentage of
Bid Item
Subcontracted
Contractor License N umber DBE
(Y/N) DBE Cert Numb er Annual Gross Receipts
DIR Reg Number
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
e of Firm in
years
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
Age of Firm in
years
Distribution – Original: Local Agency File; Copy: DLAE w/Award Package

Page 2 of 2 ends

September 2021
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Local Assistance Procedures Manual Exhibit 12-H
Sample Bid

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
The bidder_________________________________________________________________, proposed subcontractor _______________________________________________, hereby certifies that he has ___ , has not , participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.

Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.)
Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.

Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor.

LPP 18-01 Page 6 of 22
January 2019
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Local Assistance Procedures Manual Exhibit 12-H
Sample Bid

DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:
• is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;
• has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;
• does not have a proposed debarment pending; and
• has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space.

Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.

Notes: Providing false information may result in criminal prosecution or administrative sanctions.

The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.

LPP 18-01 Page 10 of 22
January 2019
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Local Assistance Procedures Manual Exhibit 12-H
Sample Bid

NONLOBBYING CERTIFICATION

FOR FEDERAL-AID CONTRACTS
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
(l) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.

LPP 18-01 Page 11 of 22
January 2019
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

D D D
□ □
□ □ ---
B
----
□ □
Local Assistance Procedures Manual Exhibit 12-H
Sample Bid

DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352

1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offer/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
e. loan guarantee year _____ quarter _________
f. loan insurance date of last report __________

4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:

Prime Subawardee
Tier_______ , if known
Congressional District, if known Congressional District, if known

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable ___________________

8. Federal Action Number, if known: 9. Award Amount, if known:

10. a. Name and Address of Lobby Entity b. Individuals Performing Services (including (If individual, last name, first name, MI) address if different from No. 10a) (last name, first name, MI)
(attach Continuation Sheet(s) if necessary)

11. Amount of Payment (check all that apply) 13. Type of Payment (check all that apply) $_____________ actual planned a. retainer
b. one-time fee

12. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
b. in-kind; specify: nature ______________ e deferred
value _____________ f. other, specify _________________________

14. Brief Description of Services Performed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 11:
(attach Continuation Sheet(s) if necessary)

15. Continuation Sheet(s) attached: Yes No

16. Information requested through this form is authorized by Title 31 U.S.C. Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered into. This disclosure is required
pursuant to 31 U.S.C. 1352. This information will be
reported to Congress semiannually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Signature:________________________________ ________
Print Name: ________________________________ ______
Title:________________________________ ____________
Telephone No.:_____________________ Date: __________
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
LPP 18-01 Page 12 of 22
January 2019 Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Local Assistance Procedures Manual Exhibit 12-H
Sample Bid

INSTRUCTIONS FOR COMPLETION OF SF-LLL,

DISCLOSURE OF LOBBYING ACTIVITIES
This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of covered Federal action or a material change to previous filing pursuant to title 31 U.S.C. section 1352. The filing of a form is required for such payment or agreement to make payment to lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress an officer or employee of Congress or an employee of a Member of Congress in connection with a covered Federal action. Attach a continuation sheet for additional information if the space on the form is inadequate. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.

1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence, the outcome of a covered Federal action.

2. Identify the status of the covered Federal action.

3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last, previously submitted report by this reporting entity for this covered Federal action.

4. Enter the full name, address, city, state and zip code of the reporting entity. Include Congressional District if known.

Check the appropriate classification of the reporting entity that designates if it is or expects to be a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the first tier. Subawards includ e but are not limited to subcontracts, subgrants and contract awards under grants.

5. If the organization filing the report in Item 4 checks "Subawardee" then enter the full name, address, city, state and zip code of the prime Federal recipient. Include Congressional District, if known.

6. Enter the name of the Federal agency making the award or loan commitment. Include at least one organization level below agency name, if known. For example, Department of Transportation, United States Coast Guard.

7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans and loan commitments.

8. Enter the most appropriate Federal identifying number available for the Federal action identification in item 1 (e.g., Request for Proposal (RFP) number, Invitation for Bid (IFB) number, grant announcement number, the contract grant. or loan award number, the application/proposal control number assigned by the Federal agency). Include prefixes, e.g., "RFP-DE-90-001."

9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitments for the prime entity identified in item 4 or 5.

10. (a) Enter the full name, address, city, state and zip code of the lobbying entity engaged by the reporting entity identified in item 4 to influenced the covered Federal action.
(b) Enter the full names of the individual(s) performing services and include full address if different from 10 (a). Enter Last Name, First Name and Middle Initial (Ml).

11. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (item 4) to the lobbying entity (item 10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.

12. Check the appropriate box. Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.

13. Check the appropriate box. Check all boxes that apply. If other, specify nature.

14. Provide a specific and detailed description of the services that the lobbyist has performed or will be expected to perform and the date(s) of any services rendered. Include all preparatory and related activity not just time spent in actual contact with Federal officials. Identify the Federal officer(s) or employee(s) contacted or the officer(s) employee(s) or Member(s) of Congress that were contacted.

15. Check whether or not a continuation sheet(s) is attached.

16. The certifying official shall sign and date the form, print his/her name title and telephone number.

Public reporting burden for this collection of information is estimated to average 30 minutes per response, including time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503.

SF-LLL-Instructions Rev. 06-04-90«ENDIF »
LPP 18-01 Page 13 of 22
January 2019 Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Local Assistance Procedures Manual Exhibit 12-H
Sample Bid
Insert completed
[Exhibit 15-G Local Agency Bidder DBE Commitment (Construction Contracts)] here.

Insert completed
[Exhibit 15-H DBE Information —Good Faith Efforts]
here.

Attach
[RAILROAD AGREEMENT]
(if required)
LPP 18-01 Page 16 of 22
January 2019
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Local Assistance Procedures Manual Exhibit 15-G
Construction Contract DBE Commitment
Exhibit 15-G: Construction Contract DBE Commitment

1. Local Agency: 2. Contract DBE Goal:

3. Project Description:

4. Project Location:

6. Prime Certified DBE:  7. Bid Amount:5. Bidder's Name:

8. Total Dollar Amount for ALL Subcontractors: 9. Total Number of ALL Subcontractors:

10. Bid
Item
Number

11. Description of Work, Service, or
Materials Supplied

12. NAICS or
Work
Category
Codes

13. DBE
Certification
Number

14. DBE Contact Information
(Must be certified on the date bids are
opened)

15. DBE
Dollar
Amount
Local Agency to Complete this Section upon Execution of Award 16. TOTAL CLAIMED DBE PARTICIPATION

22. Local Agency Contract Number:

23. Federal-Aid Project Number:
%24. Bid Opening Date:

25. Contract Award Date:

IMPORTANT: Identify all DBE firms being claimed for credit, regardless of tier. Names of the First Tier DBE Subcontractors and their respective item(s) of work listed above must be consistent, where applicable with the names and items of the work in the "Subcontractor List" submitted with your bid. Written confirmation of each listed DBE is required.

26. Award Amount:

Local Agency certifies that all DBE certifications are valid and information on this form is complete and accurate.

27. Local Agency Representative’s Signature 28. Date

29. Local Agency Representative’s Name 30. Phone

31. Local Agency Representative’s Title

17. Preparer’s Signature 18. Date

19. Preparer’s Name 20. Phone

21. Preparer’s Title
DISTRIBUTION: 1. Original – Local Agency

2. Copy – Caltrans District Local Assistance Engineer (DLAE). Failure to submit to DLAE within 30 days of contract execution may result in de-obligation of federal funds on contract.

3. Include additional copy with award package.

Page 1 of 2 ends

January 2023 Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Local Assistance Procedures Manual Exhibit 15-G
Construction Contract DBE Commitment
INSTRUCTIONS – CONSTRUCTION CONTRACT DBE COMMITMENT

CONTRACTOR SECTION

1. Local Agency - Enter the name of the local agency that is administering the contract.

2. Contract DBE Goal - Enter the contract DBE goal percentage as it appears on the project advertisement.

3. Project Description - Enter the project description as it appears on the project advertisement (Bridge Rehab, Seismic Rehab, Overlay, Widening, etc).

4. Project Location - Enter the project location(s) as it appears on the project advertisement.

5. Bidder’s Name - Enter the contractor’s firm name.

6. Prime Certified DBE - Check box if prime contractor is a certified DBE.

7. Bid Amount - Enter the total contract bid dollar amount for the prime contractor.

8. Total Dollar Amount for ALL Subcontractors – Enter the total dollar amount for all subcontracted contractors.

SUM = (DBEs + all Non-DBEs). Do not include the prime contractor information in this count.

9. Total number of ALL subcontractors – Enter the total number of all subcontracted contractors. SUM = (DBEs + all Non-DBEs). Do not include the prime contractor information in this count.

10. Bid Item Number - Enter bid item number for work, services, or materials supplied to be provided.

11. Description of Work, Services, or Materials Supplied - Enter description of work, services, or materials to be provided. Indicate all work to be performed by DBEs including work performed by the prime contractor’s own forces, if the prime is a DBE. If 100% of the item is not to be performed or furnished by the DBE, describe the exact portion to be performed or furnished by the DBE. See LAPM Chapter 9 to determine how to count the participation of DBE firms.

12. NAICS or Work Category Codes - Enter NAICS or Work Category Codes from the California Unified Certification Program database.

13. DBE Certification Number - Enter the DBE’s Certification Identification Number. All DBEs must be certified on the date bids are opened.

14. DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted contractors.

Also, enter the prime contractor’s name and phone number, if the prime is a DBE.

15. DBE Dollar Amount - Enter the subcontracted dollar amount of the work to be performed or service to be provided.

Include the prime contractor if the prime is a DBE. See LAPM Chapter 9 for how to count full/partial participation.

16. Total Claimed DBE Participation - $: Enter the total dollar amounts entered in the “DBE Dollar Amount” column. %: Enter the total DBE participation claimed (“Total Claimed DBE Participation Dollars” divided by item “Bid Amount”). If the total % claimed is less than item “Contract DBE Goal,” an adequately documented Good Faith Effort (GFE) is required (see Exhibit 15-H DBE Information - Good Faith Efforts of the LAPM).

17. Preparer’s Signature - The person completing the DBE commitment form on behalf of the contractor’s firm must sign their name.

18. Date - Enter the date the DBE commitment form is signed by the contractor’s preparer.

19. Preparer’s Name - Enter the name of the person preparing and signing the contractor’s DBE commitment form.

20. Phone - Enter the area code and phone number of the person signing the contractor’s DBE commitment form.

21. Preparer’s Title - Enter the position/title of the person signing the contractor’s DBE commitment form.

LOCAL AGENCY SECTION

22. Local Agency Contract Number - Enter the Local Agency contract number or identifier.

23. Federal-Aid Project Number - Enter the Federal-Aid Project Number(s).

24. Bid Opening Date - Enter the date contract bids were opened.

25. Contract Award Date - Enter the date the contract was executed.

26. Award Amount – Enter the contract award amount as stated in the executed contract.

27. Local Agency Representative’s Signature - The person completing this section of the form for the Local Agency must sign their name to certify that the information in this and the Contractor Section of this form is complete and accurate.

28. Date - Enter the date the DBE commitment form is signed by the Local Agency Representative.

29. Local Agency Representative’s Name - Enter the name of the Local Agency Representative certifying the contractor’s DBE commitment form.

30. Phone - Enter the area code and phone number of the person signing the contractor’s DBE commitment form.

31. Local Agency Representative Title - Enter the position/title of the Local Agency Representative certifying the contractor’s DBE commitment form.

Page 2 of 2 ends

January 2023 Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
EXHIBIT 15-H: PROPOSER/CONTRACTOR GOOD FAITH EFFORTS
Cost Proposal Due Date ___________________ PE/CE
Federal-aid Project No(s). _____________________ Bid Opening Date ___________________ CON The established a Disadvantaged Business Enterprise (DBE) goal of ______ for this contract. The information provided herein shows the required good faith efforts to meet or exceed the DBE contract goal.

Proposers or bidders submit the following information to document their good faith efforts within five (5) calendar days from cost proposal due date or bid opening. Proposers and bidders are recommended to submit the following information even if the Exhibit 10-O1: Consultant Proposal DBE Commitments or Exhibit 15-G:

Construction Contract DBE Commitment indicate that the proposer or bidder has met the DBE goal. This form protects the proposer’s or bidder’s eligibility for award of the contract if the administering agency determines that the bidder failed to meet the goal for various reasons, e.g., a DBE firm was not certified at bid opening, or the bidder made a mathematical error.

The following items are listed in the Section entitled “Submission of DBE Commitment” of the Special Provisions, please attach additional sheets as needed:

A. The names and dates of each publication in which a request for DBE participation for this project was placed by the bidder (please attach copies of advertisements or proofs of publication):

Publications Dates of Advertisement
B. The names and dates of written notices sent to certified DBEs soliciting bids for this project and the dates and methods used for following up initial solicitations to determine with certainty whether the DBEs were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.):

Names of DBEs Solicited Date of Initial Solicitation Follow Up Methods and Dates

Page 1 of 3 ends

May 2020
Federal Aid Project No: CPFCDSL 5308(025) Contract No. 4015

Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
C. The items of work made available to DBE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE contract goal.

Items of Proposer or Bidder Breakdown of Amount Percentage Work Normally Performs Item Items ($) Of
(Y/N) Contract
D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the bidder's rejection of the DBEs, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if the selected firm is not a DBE:

Names, addresses and phone numbers of rejected DBEs and the reasons for the bidder's rejection of the DBEs:

Names, addresses and phone numbers of firms selected for the work above:

E. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining information related to the plans, specifications and requirements for the work which was provided to DBEs:

Page 2 of 3 ends