There are five native vegetation communities found in the project area that are considered to be ESHA by the City, County and California Department of Fish & Wildlife (“CDFW”), and that would suffer permanent impacts as a result of the proposed project: California Brittle Bush – Ashy Buckwheat Scrub Alliance: 0.42 acres; Quailbush Scrub Alliance: 1.73 acres; California Sagebrush – (Purple Sage) Scrub Alliance: 1.29 acres; Coyote Brush Scrub Alliance: 0.71 acres; Lemonade Berry Scrub Alliance: 0.17 acres. In total,

4.32 acres of ESHA vegetation communities would suffer permanent impacts resulting from the project.

A total of 22 species of native birds were detected on site, including several with the potential to nest there. Nests, eggs, and nestlings of all native birds are protected by the Migratory Bird Treaty Act and the California Fish and Game Code. Vegetation clearing and grading, if occurring during the nesting season, could have the potential to destroy nests, eggs and nestlings, in violation of these regulations. Therefore, impacts to nesting birds are potentially significant.

Potential project impacts associated with biological resources would be addressed through the following mitigation measures: Measure BIO-1 requires an approved biologist to prepare and implement a worker education and awareness program (WEAP) to educate and make workers aware of sensitive habitats and species that may be encountered in the project area, and to inform workers of required actions that must be implemented to avoid or minimize impacts to sensitive species and habitats. Measure BIO-2 requires the construction limits to be fenced with highly visible fencing to avoid inadvertent impacts to adjacent areas of ESHA vegetation communities, native vegetation, special-status species and common wildlife species. Measures BIO-3 and BIO-4 require pre-construction surveys and relocation efforts for California Legless Lizards and San Diego Woodrats located in the project area, prior to initiation of construction.

Measure BIO-5 requires the development and implementation of a Habitat Mitigation and Monitoring Plan, prepared by a qualified biologist, to mitigate for impacts to ESHA vegetation communities. The Plan may include in-kind on-site restoration of impacted areas, and enhancement/restoration of degraded or disturbed areas adjacent to the impacted areas. A total of 4.32 acres of impacts to ESHA vegetation communities will be required to be mitigated at replacement ratios ranging from 2:1 to 4:1, depending upon the habitat types impacted. To the extent feasible, restoration will occur onsite, and any additional mitigation required shall be carried out on areas within adjacent land controlled by the County or City. Measure BIO-6 requires a qualified biologist to develop and implement a weed management plan during construction and during implementation of the habitat mitigation and monitoring plan required under Measure BIO-5, to control and prevent the spread of invasive weeds in the project area. Measure BIO-7 requires a pre- 23930504.3
City Council Findings, Resolution No. 6111
Rincon Trail Project Appeal
March 28, 2022

Page 5 ends

construction nesting bird survey to be completed within 30 days prior to any vegetation clearing, ground disturbance or use of noise-generating equipment that would occur during the nesting/breeding season of native birds potentially nesting in the project area. If active nests are found, then work would be postponed or halted in the affected area until the nest is vacated and juveniles have fledged. With the incorporation of these identified mitigation measures as project conditions of approval, all impacts would be reduced to a less than significant level.
iii. Cultural Resources: Previously recorded cultural resource sites are known to be present in and near the project area. There is the potential for subsurface intact or previously displaced cultural resources to be present and impacted during construction, which could result in a potentially significant effect to cultural resources.

Avoidance and minimization of cultural resource impacts would be addressed through the following measures: Measure CR-1 requires development of protocols for practical adherence to Measures CR-2 and CR-3 (below), prior to and after ground disturbing construction activities, through the preparation and implementation of a Cultural Resource Treatment and Inadvertent Discovery Plan (CRTP) by a qualified archaeologist. Measure CR-2 requires all personnel participating in tasks that may incur ground disturbance to be briefed by a qualified archaeologist about the archaeological sensitivity of the site, the types of cultural resources that could be encountered, and the procedures to follow in the event cultural resources or human remains are encountered.

Measure CR-3 requires a qualified archaeologist to be present to monitor initial grading and clearing activities until such time that it is determined that no additional cultural resources are located in the area, and to also monitor the installation of bridge pilings within intact soils and/or any soils deeper than 10 feet below current ground surface to ascertain that no additional cultural resources are present in the improvement area. Measure CR-4 requires that construction activities be suspended and redirected to another area in the event cultural resources are encountered to allow the monitoring archaeologist to assess the nature, extent and significance of any discoveries and develop appropriate management recommendations for treatment of the discovered cultural resource(s). With the incorporation of the identified mitigation measures as project conditions of approval, all impacts would be reduced to a less than significant level.
iv. Geology and Soils: The project area is located in a geologically active area vulnerable to earthquakes and secondary impacts such as landslides and liquefaction. The project includes features, such as the manufactured slopes and bridge crossing over the UPRR corridor, which could be damaged by seismic ground shaking. The project entails earthwork and grading activities 23930504.3
City Council Findings, Resolution No. 6111
Rincon Trail Project Appeal
March 28, 2022

Page 6 ends

to lay back and stabilize slopes in the project area in an effort to reduce potential erosion effects; nevertheless, erosion impacts could be worsened unless proper slope construction techniques are employed.

Potential project impacts associated with geology and soils would be addressed through the following measures: Measures GEO-1 and GEO-2 require the design of the bridge and bridge foundation to adhere to the recommendations contained in the project-specific geotechnical report.

Measure GEO-3 requires the design and construction of manufactured slopes to also adhere to the recommendations contained within the projectspecific geotechnical report. With the incorporation of the identified mitigation measures as project conditions of approval and aspects of the project design, all impacts would be reduced to a less than significant level. v. Hazards and Hazardous Materials: There is the potential for soils along the project alignment adjacent to the U.S. Highway 101 corridor to contain aerially deposited lead (ADL). Soils containing ADL could be used for fill soils for the project, potentially exposing the public to the contaminated soils.

Construction activities and equipment use hydrocarbon fuels and lubricants which are considered hazardous materials. Concrete, paint and other surface coatings are also considered hazardous materials, and are anticipated to be used during construction. Spills or leaks of such materials into the storm drain system could pose potentially significant water quality hazards.

With the incorporation of the following identified mitigation measures as project conditions of approval, all impacts would be reduced to a less than significant level: Measure HAZ-1 requires surface soils within the project alignment north of the UPRR corridor to be tested for potential ADL presence to determine if such soils meet applicable safety standards and can be used for fill or if standards are exceeded, the soils must be disposed of in a properly licensed landfill. Measure WAT-2 requires the contractor to prepare and implement a Stormwater Pollution Prevention Plan that includes best management practices to be implemented and monitored prior to and during construction to minimize potential construction-related water quality impacts. vi. Hydrology and Water Quality: Temporary construction activities may result in inadvertent water quality impacts related to soil, dust, paint and/or concrete entering the stormwater drainage system. There is increased potential for stormwater runoff and erosion during construction and until new/replacement vegetation is established. During the operational phase of the project, soil, trash, dog waste, and other impurities have the potential to enter the project’s storm drainage systems and could result in potentially significant water quality impacts. Failure to properly maintain new/replaced storm drain infrastructure associated with the project could result in significant erosion of the bluff face.
23930504.3
City Council Findings, Resolution No. 6111
Rincon Trail Project Appeal
March 28, 2022

Page 7 ends

Avoidance and minimization of hydrology and water quality impacts would be addressed and mitigated to less than significant levels through the following measures which have been incorporated into the project conditions of approval. Measure WAT-1 requires the project to obtain and maintain coverage under a Construction General Permit from the State Water Resources Control Board. Measure WAT-2 requires the contractor to prepare and implement a Stormwater Pollution Prevention Plan that includes best management practices to be implemented and monitored prior to and during construction to minimize potential construction-related water quality impacts. Measure WAT-3 requires implementation of an Erosion and Sediment Control Plan utilizing best management practices throughout grading and construction activities.

Measure WAT-4 requires replanting of native vegetation and hydroseeding of slope areas with appropriate native seed mixes as soon as practicable following completion of trail construction, in order to provide long-term stabilization of soils disturbed during construction. Measure WAT-5 requires ongoing periodic inspection and maintenance/repairs of all new and replaced storm water components on an annual basis prior to the start of the rainy season, to ensure all components are in good repair and not blocked by debris or sediment. Measure WAT-6 requires all project area storm drain inlets to be outfitted with storm drain filters/inserts to minimize pollutants from impacting the ocean. Filters shall be cleaned at least twice a year, once immediately prior to November 1 (start of the rainy season) and once in January.
vii. Land Use and Planning: The City of Carpinteria’s and County of Santa Barbara’s respective Local Coastal Programs contain a number of policies and regulations concerning resource protection within the Coastal Zone.

Project impacts to these resources could result in potentially significant land use and planning impacts unless properly mitigated. Incorporation of all of the mitigation measures identified in the EIR would reduce environmental impacts to less than significant levels, such that the proposed project would not conflict with any applicable land use plan, policy or regulation of an agency with jurisdiction over the project.
viii. Noise: Short-term, temporary noise impacts would occur during construction.

Residences closest to the project site (i.e., residences located in the Rincon Point neighborhood) are the only sensitive receptors in the project area and could periodically be exposed to potentially significant noise impacts if not properly mitigated. Construction-related traffic, such as haul trucks, which may pass by the sensitive receptors causing intermittent noise impacts.

Avoidance and minimization of noise impacts would be addressed through the following measures which have been incorporated into the project conditions of approval. Measure NOI-1 would limit construction hours for the 23930504.3
City Council Findings, Resolution No. 6111
Rincon Trail Project Appeal
March 28, 2022

Page 8 ends

project to the hours between 8:00 a.m. and 5:00 p.m., Monday through Friday. No construction is permitted to occur on weekends or state holidays.

Construction maintenance shall be limited to the same hours. Non-noise generating construction activities would be exempt from these restrictions.

Measure NOI-2 requires all construction equipment with engines to have original manufacturer’s approved muffling devices, and all stationary equipment be physically buffered from nearby sensitive receptors. ix. Tribal Cultural Resources: No known tribal cultural resources listed in the California Register of Historical Resources or in a local register of historical resources are known to be present within the project site. Nevertheless, given the known presence of sensitive archaeological resources in the general vicinity, there is potential for unknown subsurface tribal cultural resources to be present and to be impacted during construction, resulting in potentially significant impacts to tribal cultural resources.

Measure TCR-1 requires initial ground disturbing activities to be monitored by a Native American observer. The monitor/observer shall immediately inform equipment operators in the event archaeological resources are encountered, and shall be empowered to immediately halt construction activity in the area of the discovery until assessment can be completed and materials recovered, as appropriate. Measure TCR-1 in coordination with Measures CR-1 through CR-4, previously described above, would reduce potentially significant impacts to unknown tribal cultural resources to a less than significant level, and have been incorporated into the project conditions of approval.
x. Utilities and Service Systems: The project would moderately alter existing drainage patterns in the project area through re-grading of project slopes, short-term removal of vegetation, and introduction of the new impervious trail surface (approximately one acre of new impervious surface), resulting in potentially significant impacts to water quality. New storm drainage infrastructure associated with the project could pose potentially significant erosion impacts if not properly maintained to avoid failure of said infrastructure. Previously identified Measures WAT-1 through WAT-5 would address and reduce potentially significant temporary construction-related water quality impacts and storm drainage infrastructure impacts to less than significant levels, and have been incorporated into the project conditions of approval.

1.3 Conditional Use Permit Findings
Pursuant to Carpinteria Municipal Code §14.62.040(8), the City Council shall determine that all of the following criteria have been met prior to approving or approving with conditions a Conditional Use Permit:
23930504.3
City Council Findings, Resolution No. 6111
Rincon Trail Project Appeal
March 28, 2022

Page 9 ends

a. The site for the proposed use is adequate in size and shape to accommodate the use.

The portion of the Rincon Trail project located in the jurisdiction of the City of Carpinteria would fit entirely within the existing Caltrans right-of-way for U.S.

Highway 101 and City of Carpinteria right-of-way near the eastern terminus of Carpinteria Avenue. A portion of the Caltrans right-of-way located just east of the City-County boundary would be conveyed to the City of Carpinteria as part of the project in order to facilitate the City’s ongoing ownership and responsibility for this portion of the trail. A temporary construction easement may need to be acquired from the property owner of the easternmost parcel on Carpinteria Avenue (APN 001-210-016) to facilitate access to, and construction of the new trail alignment. The western trailhead would be located in an existing unimproved shoulder of Carpinteria Avenue, adjacent to the Rincon Road/State Highway 150 intersection.

Informal trailhead parking would be available via on-street parallel parking near the cul-de-sac at the end of Carpinteria Avenue and in the remaining portion of the unimproved shoulder.

Use of off-site areas for mitigation of projected permanent biological resources impacts is anticipated to be necessary to meet specified regulatory replacement ratios for loss of sensitive vegetation communities along the trail alignment. The adjacent Rincon Bluffs Preserve and natural areas of the Rincon Beach County Park have been preliminarily identified as the preferred receiver site for offsite compensatory mitigation for native vegetation impacts that cannot be accommodated onsite due to site area constraints. Final site selections for any proposed offsite compensatory mitigation efforts will be included in the required Habitat Mitigation and Monitoring Plan for the project. b. The site for the proposed use is served by streets and highways that are properly designed to carry the type and quantity of traffic generated by the subject use.

This project is designed to improve bicycle and pedestrian travel by providing a dedicated class-I direct coastal route between the eastern terminus of Carpinteria Avenue in the City of Carpinteria and public recreational facilities located southeast of the City in unincorporated Santa Barbara and Ventura Counties (i.e., Rincon Beach County Park; Rincon Point State Beach; and Pacific Coast Bikeway). The project would provide a safer and legal alternative to the current use of the unprotected U.S. Highway 101 shoulder and/or informal trails that trespass through the UPRR corridor to connect the City of Carpinteria to points southward for cyclists and pedestrians. The trail project would fill in this existing gap in the California Coastal Trail (“CCT”) system, consistent with the circulation and bikeway systems outlined in the County of Santa Barbara’s Comprehensive Plan, the City of Carpinteria’s General Plan/Coastal Land Use Plan, the statewide CCT Map, and the Plan for Improved Agency Partnering (Caltrans and California Coastal Commission, 2016). The project would enhance and improve coastal access and alternative 23930504.3
City Council Findings, Resolution No. 6111
Rincon Trail Project Appeal
March 28, 2022

Page 10 ends

transportation opportunities for bicycles and pedestrians, consistent with local coastal policies and plans.

The project would have no long-term substantive impact on the capacity of roadways in the project area. Completion of the bike path is anticipated to result in an incremental reduction of vehicle trips to access nearby popular coastal recreation destinations. Existing roadways and public parking areas at the trail ends have sufficient capacity to serve any trail-related vehicle traffic.

Temporary construction-related traffic has been estimated in the project EIR and found to be less than significant. Haul trucks used to export cut from the project site on the City’s portion of the trail would utilize U.S. Highway 101 and the State Highway 150 interchange to access the site. The EIR estimates up to three haul truck trips per hour over an eight-hour work day during the earthwork phase of construction. Given the low frequency of haul truck trips and immediate proximity of highway access, haul truck trips are not anticipated to result in any significant disruptions to traffic circulation or capacity.
c. The granting of the permit will not materially adversely affect such necessary community services as sewage disposal, fire protection, water supply, and police protection.

A copy of the project application and plans were routed to all applicable agencies and special districts for review and comments. All of these agencies have indicated the project would not have adverse effects upon their ability to continue to serve the population of Carpinteria. The project would enhance public coastal access and opportunities for alternative transportation in the Carpinteria area, providing a benefit to the community. The project would not generate wastewater needing treatment, and would not generate a noticeable increase in demand for fire or police protection services. A negligible amount of water would be required during construction and to establish/maintain the new landscape plantings.

The City’s portion of the trail project will tie into and be served by existing storm drain infrastructure that serves U.S. Highway 101, which has sufficient capacity to take on the added storm water flows generated by the new impervious surfaces affiliated with the trail project north of the UPRR crossing (estimated at approximately 0.5 acres). Mitigation Measures WAT-1 through WAT-4 address erosion and sedimentation control during construction to avoid water quality impacts and to not damage or overwhelm existing storm drain infrastructure. Mitigation Measure WAT-5 requires ongoing monitoring and upkeep of project-related storm drain infrastructure to avoid failure or damages.

An existing 4-inch sewer force main is located in the project area, near the proposed trail alignment for the section of trail north of the UPRR crossing. The sewer force main would be protected in place during construction. An abandoned underground oil pipeline passes underneath the trail alignment near the western 23930504.3
City Council Findings, Resolution No. 6111
Rincon Trail Project Appeal
March 28, 2022

Page 11 ends

trailhead located in the City of Carpinteria. The pipeline would be protected in place.

Other utilities near the project area, but not within the project footprint include a water main line and underground communication lines, neither of which would be impacted by construction of the City’s portion of the trail. d. The granting of the permit will not be detrimental to the health, safety, and general welfare of the neighborhood.

The Rincon Trail project establishes a new dedicated public Class I bicycle and pedestrian trail between the City of Carpinteria and recreational amenities (i.e., public beaches, park and bicycle path) located south of the City in unincorporated Santa Barbara and Ventura Counties. The project results in beneficial recreational, coastal access, and alternative transportation impacts for the region.

The EIR prepared for the project analyzed potentially significant environmental effects associated with the project and identified appropriate mitigation measures to ensure that all impacts were mitigated to a less than significant level. Mitigation measures were identified for the following issue areas: Aesthetics, Biological Resources, Cultural Resources, Geology/Soils, Hazards/Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Tribal Cultural Resources, and Utilities/Service Systems. In addition, compliance with Santa Barbara County Air Pollution Control District (“APCD”) standards is required to ensure that impacts to Air Quality, and Greenhouse Gas Emissions are minimized and remain less than significant. The mitigation measures incorporated into the project via the EIR and the project restrictions imposed via conditions of approval ensure that granting the permit will not be detrimental to the health, safety and welfare of the neighborhoods located nearby to project components.
e. The proposed use is consistent with the coastal plan, general plans, and applicable specific plan(s).

As discussed in the policy consistency section of the City Council staff report dated March 28, 2022 and the Planning Commission staff report dated January 18, 2022, and herein both incorporated by reference, the project would be consistent with the various applicable policies from the Land Use, Community Design, Circulation, Open Space/Conservation/Recreation, Safety, Noise, and Public Facilities/ Services Elements. The project would fill in an existing gap in the California Coastal Trail (“CCT”), thereby improving public coastal access and alternative transportation opportunities in the project area. The trail and its design elements have been reviewed by the City’s Architectural Review Board (“ARB”) for consistency with applicable design policies and found to conform. The project incorporates appropriate mitigation measures, consistent with the requirements of the City’s General Plan/Coastal Land Use Plan and Zoning Code to address all unavoidable impacts to ESHA and sensitive species, and other appropriate measures and standards are included to avoid potential impacts related to aesthetics, cultural resources, geology/soils, hazards/hazardous materials, hydrology/water quality, 23930504.3
City Council Findings, Resolution No. 6111
Rincon Trail Project Appeal
March 28, 2022

Page 12 ends

noise, tribal cultural resources, and utilities and service systems, consistent with the policies of the City’s General Plan/Coastal Land Use Plan. f. The proposed use will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat.

The EIR prepared for the project identified potentially significant impacts on aesthetics, biological resources, cultural resources, geology/soils, hazards/hazardous materials, hydrology/water quality, land use/planning, noise, and utilities/service systems; the EIR also identified standard Santa Barbara County Air Pollution Control District (“APCD”) measures that the project is required to implement to ensure impacts to air quality, and greenhouse gas emissions are minimized and remain less than significant. The EIR contains mitigation measures to reduce all environmental impacts of the proposal to less than significant levels; pertinent mitigation measures from the EIR have been incorporated as conditions of approval.

The project has also been designed to minimize land form modification, and impacts to ESHA, cultural resources and water quality, avoid or reduce exposure to geologic hazards and hazardous materials, avoid disruptions to public utilities, and be aesthetically compatible with the project setting, as required by the resource protection policies of the City’s General Plan/Coastal Land Use Plan. g. The proposed development will not conflict with recorded easements acquired by the public-at-large for access through or use of the property within the proposed development or any easements granted to any public agency or required as a condition of approval.

The proposed project would not interfere with any recorded easements acquired by the public-at-large for access through, or use of, the project area. Rather, the proposed project involves the construction of a new public multi-use pathway within existing public right-of-way between the east end of the City of Carpinteria and the unincorporated areas near the Santa Barbara/Ventura County line to facilitate improved public coastal access, recreation and alternative transportation opportunities in the area. In this regard, the project enhances public access along the Carpinteria coastline and between areas located in the City of Carpinteria and those in the unincorporated Rincon Point area.

A portion of the Caltrans right-of-way located just east of the City-County boundary would be dedicated and transferred to the City of Carpinteria as part of the project in order to facilitate the City’s ongoing ownership and responsibility for this portion of the trail. A temporary construction easement may need to be acquired from the property owner of the easternmost parcel on Carpinteria Avenue (APN 001-210- 016) to facilitate access to, and construction of the new trail alignment. The proposed project is not known to conflict with any easements granted to any public 23930504.3
City Council Findings, Resolution No. 6111
Rincon Trail Project Appeal
March 28, 2022

Page 13 ends

agency. Maintenance access for Caltrans and UPRR through the project area will be maintained/provided, as needed.
h. Any other conditions which are reasonably necessary to protect the public peace, health, safety, and general welfare.

Through the environmental review process, a number of mitigation measures have been developed in order to avoid significant impacts to the environment. All mitigation measures identified in the EIR have been included in the conditions of approval and are fully enforceable. Additional project-specific conditions of approval have been included to address traffic management during construction, property owner/neighbor outreach, and ongoing maintenance responsibilities for the trail improvements.

1.4 Coastal Development Permit Finding
Pursuant to the California Coastal Act, the Administrative Regulations of the California Coastal Commission and the City’s Local Coastal Program, it has been found that the permit requested may be issued based on the following finding:
a. The proposed development is in conformity with the City’s certified Local Coastal Program.

The Caltrans right-of-way is designated Transportation Corridor (TC) in the General Plan/Coastal Land Use Plan and is undesignated with respect to zoning. The portion of the project located on Carpinteria Avenue is designed Visitor-serving Commercial (VC) in the General Plan/Coastal Land Use Plan and is zoned Resort District (RES). The proposed use is consistent with the stipulations outlined for these land use designations as the project involves improvements to pedestrian and bicyclist facilities, which are permissible in all land use categories and zoning districts. A Conditional Use Permit and Coastal Development Permit are required for this major transportation facility. The project can meet all of the required findings for approval of the required CUP (discussed above) and CDP. The proposed project is consistent with all applicable policies in the General Plan/Coastal Land Use Plan as discussed in the City Council staff report dated March 28, 2022, and the Planning Commission staff report dated January 18, 2022, both of which are herein incorporated by reference. The project is also consistent with the Interpretive Guidelines of the California Coastal Commission and the California Coastal Act.

Attachment A
Exhibit 2: Proposed Plans
Rincon Trail Project Appeal
19-2015-CUP/CDP
City Council Hearing, March 28, 2022
The City of Carpinteria & their officers or agents shall not be responsible for the accuracy or completeness of electronic copies of the plan sheet.

Project Engineer
Date
CIVIL
No.

STATE OF CALIFORNIA

REGISTERED PROFESSIONAL ENGINEER

THE CITY OF CARPINTERIA

DEPARTMENT OF PARKS AND

RECREATION

PROJECT PLANS FOR

RINCON MULTI-USE TRAIL

IN SANTA BARBARA COUNTY

BETWEEN RINCON ROAD AND BATES ROAD
To be supplemented by 2018 State Standard Plans and Specifications

PLANS APPROVAL

SHEET INDEX
SHT. DESCRIPTION SHT NO.

TITLE SHEET

ABBREVIATIONS & LEGEND

GENERAL NOTES

KEYLINE GEOMETRY

TYPICAL SECTIONS

LAYOUTS

PROFILES

CONSTRUCTION DETAILS

CONTOUR GRADING

FENCING

DRAINAGE

PAVEMENT DELINEATIONS

UTILITY CONFLICT

PAVEMENT JOINT DETAILS

SUMMARY OF QUANTITIES

BRIDGE GENERAL PLAN

STRUCTURE CRITERIA &

CONSTRUCTION METHODS

GENERAL UPRR NOTES

BRIDGE FOUNDATION PLAN
ABUTMENT DETAILS 1
ABUTMENT DETAILS 2

TRAIL CROSS SECTIONS

SURVEY CONTROL

RIGHT-OF-WAY MAPS

PLATES & BORING LOGS

UPRR PROJECT INFORMATION

1. MILE POST 380.49 SANTA BARBARA SUB, CARPINTERIA, CA

2. LATITUDE: 34°22'48.18"N LONGITUDE: 119°28'57.20"W

3. UNION PACIFIC DOT NUMBER 441148Y

AERIAL CONCEPT RENDERING OF PROJECT LOOKING SOUTH EAST TOWARD RINCON POINT

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 TITLE
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-rincon-title sheet.dwg BY: Michael Bandich APPROVED DATE: XX XX XX HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 MB TITLE SHEET 123 4-6
7-9
10-12
13 14-23
24-25
26-29
30-39
40-42
43-46
47-49
50-56
57 58
59 60
61 62
63-70
71-72
73 74-119
04/23/2021
1 of 119

THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 S-01
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-rincon-title sheet.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB AB Aggregate Base Abn Abandon Abut Abutment AC Asphalt Concrete Adj Adjust AP Angle Point BB Beginning of Bridge BC Beginning of Curve BCR Beginning of Curb Return Beg Begin Bldg Building BM Bench Mark Bot Bottom Br BridgeBrg Bearing BVC Beginning of Vertical Curve BW Bottom of Wall CAA Cable Anchor Assembly C-C Center-to-center Chnl Channel CI Cast-iron CIDH Cast In Drilled Hole CIP Cast in place CISS Cast in Steel Shell CL Chain Link Cl Class C/L Centerline Clr Clear CM Corrugated Metal Col Column Conc Concrete CP Catch Point Cr CreekD DepthDeg Degree Det Detail DI Drainage Inlet Dia Diameter Diaph Diaphragm Dist Distance Dwy Driveway E Easting Ease Easement EB East Bound EC End of Curve ECR End of Curb Return EG Existing Ground EOD Edge of Deck EP Edge of Pavement ES Edge of Shoulder ESM Engineered Stream Material ETW Edge of Traveled Way EVC End Vertical Curve Exc Excavate Exist Existing Exp Expansion Exp Jt Expansion Joint Ext Exterior F&C Frame and Cover F&G Frame and Grate Fdn Foundation FES Flared End Section FF Filter Fabric FG Finished Grade FH Fire Hydrant Fig Figure FL Flow Line FOC Face of Concrete FS Finished Surface Ftg Footing Ga Gauge GB Grade Break GP Grading Plane Galv Galvanized GR Guard Railing Gtr Gutter H Height h, hr Hour HW Headwall Horz Horizontal HP Hinge Point HWM High water mark Irr Irrigation Jct Junction Jt Joint L Length LOL Layout line LS Lump sum Lt Left Max Maximum MBGR Metal Beam Guard Rail MH Manhole Min Minimum Misc Miscellaneous Mod Modify NTS Not to scale N Northing Oblr Obliterate OC Overcrossing OD Outside Diameter OG Original Ground OH Overhead O-O Out-to-out P page PB Pull box PC Point of curvature or Precast PCC Pt of compound curvature Ped Pedestrian Perm Mtl Permeable Material PG Profile Grade PI Point of Intersection P/L Property Line POC Point on Curve POT Point on Tangent PRC Point of Reversing Curve PS&E Plans, Specifications & Estimate PS Pre-Stressed P/S Pre Stressed PT Point of Tangent PVI Point of Vertical Intersection Qty Quantity R Radius Reinf Reinforcement Rel Relocate Ret Retaining Rev Revised RSP Rock Slope Protection Rt Right R/W Right of Way Salv Salvage SG Subgrade Sht Sheet SR Superelevation Rate Spec Special/Specification Sta Station Std Standard Str Structure SW Sidewalk S Sewer TC Top of Curb TCB Traffic Control Box TBM Temporary Benchmark TG Top of Grade/Top of Grate Top Top of Creekbank TP Telephone Pole Trans Transition TW Top of Wall TYP Typical UON Unless otherwise noted V Valve Var Variable VC Vertical Curve W Width WH Weep Hole WM Wire Mesh/Water Meter WW Wing Wall WWLOL Wing Wall Layout line
Selected Acronyms and Abbreviations
(See Caltrans Standard Plan for complete list) ABBREVIATIONS AND LEGEND S-01

ABBREVIATIONS AND LEGEND
2 of 119

1. THE PROPOSED GRADE SEPARATION PROJECT SHALL NOT INCREASE THE QUANTITY AND/OR CHARACTERISTICS OF THE FLOW IN THE RAILROAD'S DITCHES AND/OR DRAINAGE STRUCTURES. 2. THE ELEVATION OF THE EXISTING TOP-OF-RAIL PROFILE SHALL BE VERIFIED BEFORE BEGINNING CONSTRUCTION. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE RAILROAD PRIOR TO CONSTRUCTION. 3. THE CONTRACTOR MUST SUBMIT A PROPOSED METHOD OF EROSION AND SEDIMENT CONTROL AND HAVE THE METHOD APPROVED BY THE RAILROAD. 4. . ALL SHORING SYSTEMS THAT IMPACT THE RAILROAD'S OPERATIONS AND/OR SUPPORTS THE RAILROAD'S EMBANKMENT SHALL BE DESIGNED AND CONSTRUCTED PER CURRENT RAILROAD GUIDELINES FOR TEMPORARY SHORING. 5. ALL DEMOLITIONS WITHIN THE RAILROAD'S RIGHT-OF-WAY AND/OR DEMOLITION THAT MAY IMPACT THE RAILROAD'S TRACKS OR OPERATIONS SHALL BE IN COMPLIANCE WITH THE RAILROAD'S DEMOLITION GUIDELINES. 6. ERECTION OVER THE RAILROAD'S RIGHT-OF-WAY SHALL BE DESIGNED TO CAUSE NO INTERRUPTION TO THE RAILROAD'S OPERATION, ENABLING THE TRACK(S) TO REMAIN OPEN TO TRAFFIC PER THE RAILROAD'S REQUIREMENTS. 7. RAILROAD REQUIREMENTS DO NOT ALLOW WORK WITHIN 50 FEET OF TRACK CENTERLINE WHEN A TRAIN PASSES THE WORK SITE AND ALL PERSONNEL MUST CLEAR THE AREA WITHIN 25 FEET OF THE TRACK CENTERLINE AND SECURE ALL EQUIPMENT. 8. FALSE-WORK CLEARANCES SHALL COMPLY WITH MINIMUM CONSTRUCTION CLEARANCES. 9. ALL PERMANENT CLEARANCES SHALL BE VERIFIED BEFORE PROJECT CLOSING. 10. FOR RAILROAD COORDINATION PLEASE REFER TO THE RAILROAD MINIMUM REQUIREMENTS AS PART OF SPECIAL PROVISIONS. GENERAL UPRR NOTES THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 GN
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
3 of 119
300 301
302
303
304
23+37.15 BC
10+88.40 BC
13+34.27 BC
24+32.29 EC
13+04.64 EC
18+60.68 EC
"BENCH-01"
L2
L3
L1
C3
C1 C2
L4
= 800+64.56 "TH" LINE
10+00 BEG
10+40
"TH"* *SEE CONSTRUCTION DETAIL "WEST TRAILHEAD" FOR LAYOUT OF "TH" LINE. 11 12
13 14 15 16
17 18
19 20
21 22
23 24
25 "C
R
T" 110 111
112
113
114
115
116
117
118
119
120 121
201
202
203
204
205
206
207
701
700+00 BEG
702+00 END
200+00 BEG
208+00 END
38+50 END
26+11.09 BC
32+50.23 BC
35+01.92 BC
24+32.29 EC
27+16.50 EC
33+33.76 EC
37+13.95 EC
401
901
"BFILL"
"FL-01"
400+00 BEG
401+62.98 END
400+10.65 BC
400+86.55 EC
L5
L6
L7
C3
C4
C5 C6
L22
L15
L16
C8
L4
24 25
26 27
28 29
30 31
32 33
34 35
36 37
38 "WALL-01"
"CRT" 500
501
502
503
504
504
"SHD"
L12 NORTH THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 K-1
f:\pdata\0_active projects\carp rincon trail\production drawings\carp key line-k.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
0 50' 100' SCALE 1"=50' KEYLINE GEOMETRY K-01

MATCH LINE

SEE ABOVE

MATCH LINE

SEE BELOW
4 of 119
11 12
13 14 15 16
17 18
19 20
21 22
23 24
25 301
302
303
304
300+00 BEG
304+55.43 END
301+45.71 BC
302+05.44 EC
"CRT" L13
L14
C7
"TH"
"BENCH-01"
24 25
26 27
28 29
30 31
32 33
34 35
36 37
201
202
203
204
205
206
207
702
700
701 110 111
112
113
114
115
116
117
118
119
120 121
109+50 BEG
121+30.31 END
120+56.81 AP
111+99.94 AP
117+40.25 AP
400
401
900+00 BEG
901+48.10 END
901
"WALL-01"
"CRT"
L10 L11 L8
L9
L23
"FL-01"
"BFILL"
"O.A."
501
502
503
504
500+00 BEG
504+43.16 END
500+41.89 AP
502+04.03 AP
503+90.46 AP
502+30.33 BC
503+72.83 EC L17
L18
L19
L20 C9
L21 NORTH THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 K-2
f:\pdata\0_active projects\carp rincon trail\production drawings\carp key line-k.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
0 50' 100' SCALE 1"=50' KEYLINE GEOMETRY K-02

MATCH LINE

SEE ABOVE

MATCH LINE

SEE BELOW
5 of 119
"CRT" LINE SEGMENT IDL1C1 L2C2L3C3L4C4L5C5L6C6L7 START STATION 10+00.00 10+88.40 13+04.64 13+34.27 18+60.68 23+37.15 24+32.29 26+11.09 27+16.50 32+50.23 33+33.76 35+01.92 37+13.95 LENGTH 88.40' 216.23' 29.63' 526.41' 476.46' 95.14' 178.81' 105.40' 533.73' 83.53' 168.16' 212.03' 136.05' END STATION 10+88.40 13+04.64 13+34.27 18+60.68 23+37.15 24+32.29 26+11.09 27+16.50 32+50.23 33+33.76 35+01.92 37+13.95 38+50.00 START NORTHING 1965107.50 1965083.80 1964989.94 1964972.44 1964579.72 1964161.66 1964070.09 1963909.17 1963808.87 1963369.26 1963297.96 1963149.71 1962986.44 START EASTING 6113550.33 6113635.50 6113829.00 6113852.92 6114197.11 6114425.67 6114427.92 6114349.97 6114357.60 6114660.27 6114703.72 6114783.09 6114916.29 DIRECTION/ DELTA S74° 26' 55.93"E 020°38'56" S53° 47' 59.83"E 025°08'03" S28° 39' 56.47"E 054°30'39" S25° 50' 43.02"W 060°23'32" S34° 32' 48.53"E 006°22'54" S28° 09' 54.77"E 022°05'16" S50° 15' 10.59"E RADIUS 600.00' 1200.00' 100.00' 100.00' 750.00' 550.00' "FL-01" LINE SEGMENT IDL8L9 L10 L11 START STATION 109+50.00 111+99.94 117+40.25 120+56.81 LENGTH 249.94' 540.31' 316.56' 73.50' END STATION 111+99.94 117+40.25 120+56.81 121+30.31 START NORTHING 1963940.14 1963748.63 1963320.92 1963053.33 START EASTING 6114157.84 6114318.44 6114648.60 6114817.72 DIRECTION/ DELTA S39° 58' 57.52"E S37° 39' 54.64"E S32° 17' 37.38"E S41° 59' 02.24"E RADIUS "C
R
T" LIN
E
"BENCH-01"
"FL-01" LINE
"BFILL" LINE
"WALL-01" LINE
"O.A." LINE
"FL-02" LINE
"SHD" LINE "BENCH-01" LINE SEGMENT IDL13 C7 L14 START STATION 300+00.00 301+45.71 302+05.44 LENGTH 145.71' 59.73' 249.99' END STATION 301+45.71 302+05.44 304+55.43 START NORTHING 1964639.20 1964531.52 1964483.02 START EASTING 6114052.81 6114150.97 6114185.59 DIRECTION/ DELTA S42° 21' 16.74"E 013°41'20" S28° 39' 56.47"E RADIUS 250.00' "O.A." LINE SEGMENT IDL15 C8 L16 START STATION 400+00.00 400+10.65 400+86.55 LENGTH 10.65' 75.89' 76.43' END STATION 400+10.65 400+86.55 401+62.98 START NORTHING 1963893.10 1963883.51 1963811.29 START EASTING 6114373.30 6114368.65 6114374.15 DIRECTION/ DELTA S25° 50' 43.02"W 060°23'32" S29° 17' 32.03"E RADIUS 72.00' "FL-02" LINE SEGMENT IDL12 START STATION 200+00.00 LENGTH 800.00' END STATION 208+00.00 START NORTHING 1963728.07 START EASTING 6114531.00 DIRECTION/ DELTA S33° 27' 28.84"E RADIUS "SHD" LINE SEGMENT IDL17 L18 L19 C10 C9 L20 L21 START STATION 500+00.00 500+41.89 502+04.03 502+30.33 502+30.33 503+72.83 503+90.46 LENGTH 41.89' 162.13' 26.30' 142.50' 142.50' 17.63' 52.70' END STATION 500+41.89 502+04.03 502+30.33 503+72.83 503+72.83 503+90.46 504+43.16 START NORTHING 1963334.77 1963303.73 1963166.12 1963142.98 1963142.98 1963032.19 1963020.57 START EASTING 6114699.58 6114727.71 6114813.45 6114825.95 6114825.95 6114914.38 6114927.64 DIRECTION/ DELTA S42° 11' 30.43"E S31° 55' 25.29"E S28° 23' 15.32"E 020°24'44" 020°24'44" S48° 47' 59.54"E S29° 07' 08.81"E RADIUS 400.00' 400.00' "BFILL" LINE SEGMENT IDL23 START STATION 900+00.00 LENGTH 148.10' END STATION 901+48.10 START NORTHING 1963021.64 START EASTING 6114762.73 DIRECTION/ DELTA S38° 19' 43.02"E RADIUS "WALL-01" LINE SEGMENT IDL22 START STATION 700+00.00 LENGTH 200.00' END STATION 702+00.00 START NORTHING 1963525.73 START EASTING 6114483.40 DIRECTION/ DELTA S36° 52' 03.04"E RADIUS THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 K-3
f:\pdata\0_active projects\carp rincon trail\production drawings\carp key line-k.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB KEYLINE GEOMETRY K-03
6 of 119

1.4:1 SEE NOTES CP OIL LINE SEE NOTES OG 5' 3' 3' 5' 1.5' ESETW ETWES HP 5' "CRT" LINE FL -5% SR% PG CP x x
x SEWER FORCE MAIN SEE NOTES R/W 0.83' FENCE R/W 3' 5' 5' 3' PG ESETW ETW ES

1.4:1
(CUT) FENCE OG CP
xxx 5% SR% "CRT" LINE SEWER FORCE MAIN SEE NOTES ES
10:1
(FILL) OG CP 5%6' SEE NOTES REGARDING SLOPE ROUNDING OIL LINE SEE NOTES CP 1' (TYP) (CUT) (FILL) A RW 5' 3' 3' 5' 1.5' 0.83' ESETW ETWES HP 5' "CRT" LINE FL

1.4:1 (MAX*)

1.4:1 5% SR% PG PG "BENCH-01" LINE 12' 10% CP CP OIL LINE SEE NOTES OG xxx *SEE NOTES REGARDING THE TERM "MAX" WHEN REFERRING TO SLOPES SEWER FORCE MAIN SEE NOTES R/W FENCE R/W 0 10' 20' SCALE 1"=10' H&V TYPICAL SECTIONS X-01 STA: 17+30 TO 22+00 NOTES: 1. STRUCTURAL SECTION FOR PATH AND GUTTER IS: 0.42' JPCP 0.5' AB (CLASS 2) 2. DIMENSIONS OF THE STRUCTURAL SECTION ARE SUBJECT TO TOLERANCES SPECIFIED IN THE STANDARD SPECIFICATIONS. 3. SUPERELEVATION AS SHOWN OR AS DIRECTED BY ENGINEER. ALSO SEE PROFILE SHEETS. 4. CHEVRON/VENOCO OIL PIPELINE IS SHOWN 9-FEET BELOW THE ORIGINAL GROUND, BASED ON OBSERVATION NOTES DURING CONSTRUCTION. ACTUAL DEPTH MAY VARY. 5. A SEWER "FORCE MAIN" EXISTS ALONG THE SOUTH BOUND LANE OF HWY 101. RECORD DRAWINGS SHOW THE DEPTH OF THIS SEWER TO BE HIGHLY VARIABLE. 6. CALTRANS ELECTRIC LIGHTING CONDUIT IS NOT SHOWN. THIS EXISTS ALONG SHOULDER OF THE SOUTHBOUND 101 LANES. 7. REGARDING THE TERM "MAX" WHEN REFERRING TO SLOPES, SOME CUT SLOPES ARE BUILT BETWEEN DIFFERENT ALIGNMENTS EACH WITH THEIR OWN PROFILE. THE ENGINEERS HAVE SET THESE ALIGNMENTS TO ACCOMMODATE THE CUT SLOPES SHOWN. THE TERM "MAX" INDICATES THE MAXIMUM VARIABLE SLOPE CREATED BY THE GRADING BETWEEN THESE ALIGNMENTS 8. SLOPE ROUNDING IS NOT SHOWN. SEE SPECIAL PROVISIONS FOR ADDITIONAL INFORMATION. 9. SEE FENCING PLAN FOR FENCE LAYOUT. STA: 10+40 TO 12+00 STA: 12+00 TO 17+30 THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 X-01
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
TYPICAL SECTIONS CONSTRUCTIONS NOTES: A. CALTRANS TYPE A1 CURB "CRT" LINE: 10+40 TO 12+00 7 of 119
3' 5' 3' 5' 1.5' ESETW ETWES HP 5' "CRT" LINE FL

1.4:1 PG CP CP (FILL)
4:1 OG OG OIL LINE
x
x 5%
x SR% CP OG (CUT) 5%
VAR*
1 1 HP ES 6.5' CP 5% ES HP 6.5'
1 1CP VAR 3' SEWER FORCE MAIN SEE NOTES VAR R/W 0.83' 2' MIN SEE FENCING PLAN (TYP) SEE DETAIL "A" (THIS SHEET) FL FENCE R/WVAR. 5' 5' 3' 20' TO 3' 1:1 EL: 110 3' VAR PG 5' 1.5' HP FL ES "O.A." LINE ETW ETWES HP CP "CRT" LINE CP R/W CP OG x
x SR%
x OVERLOOK AREA (SEE NOTES) R/W 0.83'
VAR CP
*
x
A 6.5' SR%
x
x FENCE ES *SLOPE VARIES: -2:1 ( ≈23+10 TO 23+50)
-4:1 (23+50 TO 24+48)
#4 @ 12 #5 CONT. (TYP)
6"
3" CLR
STA: 22+00 TO 24+48 (BB)
STA: 26+08 (EB) TO 27+16.50 (EC)
0 10' 20' SCALE 1"=10' H&V TYPICAL SECTIONS X-02 NOTES: 1. SEE OVERLOOK AREA CONSTRUCTION DETAILS FOR MORE INFORMATION. THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 X-02
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
TYPICAL SECTIONS CONSTRUCTIONS NOTES: A. CALTRANS TYPE A1 CURB "CRT" LINE: 26+18 TO 26+85 STATION 26+85 TO 27+16.10 STATION ≈26+18 TO 26+85 DETAIL A 8 of 119

1.25:1
x
x
x
1:1 "CRT" LINE CP CP OG LOWER SLOPE REINFORCEMENT (SEE NOTE) COMMUNICATION LINE SEE NOTES 5' 1.5'HP FL 5' 3' 3' ESETW ETWES 5' SR% PG 5'HP R/W FENCE 0.83' "FL-01" LINE 2:1CP PGCP
2:1 "FL-02" LINE 5:1PG CP 5:1 CP
x
x
x VAR 0' TO 20' "SHD" LINE 5%
xxxxxx MSE WALL STATION ≈30+91 TO 31+91 ("CRT" LINE) SEE NOTES STA: 27+16.50 TO END 0 10' 20' SCALE 1"=10' H&V TYPICAL SECTIONS X-03 NOTES: 1. "KEYWAY" ALONG OLD RAILROAD BENCH IS NOT SHOWN, TO PROVIDE CLARITY REGARDING LAYOUT OF CONCRETE DITCH. SEE CONSTRUCTION DETAILS. 2. SEE "CONSTRUCTION DETAIL" FOR MORE INFORMATION REGARDING SLOPE REINFORCEMENT. 3. SEE "CONSTRUCTION DETAILS" FOR MORE INFORMATION REGARDING MSE WALL. 4. APPROXIMATE LIMITS OF MID SLOPE REINFORCEMENT ARE STATION 32+00 TO 35+00. LIMITS TO BE DETERMINED DURING CONSTRUCTION. SEE BENGAL'S GEOTECHNICAL REPORT FOR THE PROPOSED RINCON BEACH MULTI-USE TRAIL. 5. A FRONTIER "COMMUNICATION LINE" EXISTS ALONG THE LOWER EXISTING BENCH. SEE UTILITY DRAWINGS FOR MORE INFORMATION. THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 X-03
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB

TYPICAL SECTIONS
9 of 119
125 150 175 200 225 1.50% -4.90%
182.3
183.00
184.0
182.70
184.3
178.00
180.2
173.10
174.1
168.20
171.8
163.30
165.2
158.40
160.2
153.50
156.9
148.60
153.9
143.70
149.1
138.80
145.4
133.90
183.4
183.55
183.9
180.45
182.4
175.55
175.8
170.65
173.4
165.75
168.1
160.85
162.7
155.95
158.3
151.05
155.8
146.15
152.9
141.25
146.8
136.35 9+50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 10+00
183.00 PVI STA: 10+75 PVI ELEV: 184.13 K: 15.6
10+25 BVC
183.38
11+25 EVC
181.68 100.0' VC
OG
PG 0.0% 1.0% (LT) AXIS OF ROTATION -1.0% (RT) 1.0% 2.0% -1.0% -2.0% OG PG 10+00

1.0%
10+00
-1.0%
10+40 CONFORM
183.52
SD
SD
SD
SD
SD
SD
SD
SD
SD
FM
FM
FM

FM FM FM
FM
FM
FM
FM
FM 3G 3H 3k 3P 3N 3O 3S
OIL
OIL
OIL

OIL OIL
COM
W
W
E
E
ABANDONED 6"
36" RCP
18" CMP
30" RCP
18" RCP
18" RCP
4" HDPE
W
W
W
W
W
COM
COM

OIL PIPELINE ABANDONED
SD
4" HDPE 150 175 175 200 150175200 175 200 205 210 210 200 125 str.lt. down drain str.lt. str.lt. CB (6)wm d.i. d.i. d.i. d.i. d.i. d.i. hwy sign sign hwy sign oil marker oil marker oil marker oil marker mh bell mh gte gate h20 valve nut 4"cyp 4"ironwood 6"cyp 5"cyp 10"pepper36"euc 36"euc 10"cyp 24"euc h2o mark TP 07 TP 01 TP 02 TP 05 TP 06 TP 09 TP 03 DH 08 TP 08 2" clump-euc hwy sign hwy signs hwy signs dense brush dense brush dense brush dense brush dense brush conc. asph. asph. h20 valve nut str.lt. call box hwy sign misc. marker sign foc R/W
(CITY)
R/W
(CITY)

R/W (CITY)
R/W
(CITY)
(CITY) R/W R/W (CITY) R/W (UPRR) R/W (UPRR)
32 33
34 35
36 R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
(CITY)
CITY
COUNTY

CITY COUNTY
R/W
(STATE)

CALTRANS DEDICATES TO CITY

RINCON ROAD
(HWY 150)

CARPINTERIA
AVENUE CITY PROPERTY STATE: DOT-RW83 R 0.6 APN 001-210-013 APN 001-210-023 APN 001-210-016 APN 001-220-092 (SOUTHERN PACIFIC TRANSPORTATION CO.)
101 SB
101 SB ON-RAMP
101 NB
101 SB ON-RAMP
304+55.43 300 301
302
303
304
11 12
13 14 15 16
17 18
19 20
21 10+88.40 BC
BC
13+34.27
EC
13+04.64
EC
18+60.68
10+40 BEG. "CRT" LINE 175 175 150 175 200 175 200
AVENUE ES CP ES CP "CRT" LINE "BENCH-01" LINE ES(EXISTING) TRAILHEAD (SEE NOTES) 8'
16'

14.5'
12'
12' LEGEND CITY RIGHT OF WAY STATE RIGHT OF WAY RAILROAD RIGHT OF WAY PROPERTY LINE RIGHT OF WAY TAKE CATCH POINT/DAYLIGHT CITY/COUNTY LIMITS CENTERLINE 125 150 175 200 225 145.4
133.90
138.5
129.00
131.7
124.10
142.0
131.45
135.5
126.55 21+00 22+00 23+00
23+00

1.0%
23+00
-1.0% STORM DRAINS SEWER CABLE OIL WATER

1.25:1
SD
SD
SD
SD
FM
FM 3J
OIL
4" HDPE
SD 125 150 str.lt. hwy sign d.i. oil marker TP 10 conc. conc. hwy sign R/W (UPRR) R/W (UPRR) 30 31
R/W
(STATE) STATE: DOT-RW83 R 0.4
304+55.43
22 23
24 23+37.15 BC 150 125 NORTH
MATCHLINE - STA 23+10

SEE NEXT SHEET
0 50' 100' SCALE 1"=50' H 1"=30' V LAYOUT LO-01 NOTES: 1. FOR COMPLETE RIGHT-OF-WAY INFORMATION, SEE RIGHT-OF-WAY MAPS IN COUNTY OFFICES. 2. SEE "KEY LINE GEOMETRY" SHEET FOR LAYOUT INFORMATION. 3. SEE CONSTRUCTION DETAILS SHEET FOR TRAILHEAD INFORMATION AT ENDS OF BIKE PATH. 4. TEMPORARY FENCE, (TYPE ESA) WILL BE LOCATED 10-FEET BEYOND DAYLIGHT LINE OR AS DIRECTED BY THE ENGINEER. 5. SEE CONSTRUCTION DETAILS FOR LAYOUT OF TRAILHEAD. THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 LO-01
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
LAYOUT
10 of 119
5075 100 125 5075100 125
OG
PG
115.0
119.33

74.0 115.61
102.1
112.02
134.1
108.33
121.1
117.8
103.72
110.4

98.88 109.9

94.04 103.3

89.20 121.65
112.0
117.41

71.0 113.82
133.4
110.23
117.4
106.13
111.8
101.30
108.0

96.46 108.2

91.62 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 -3.59% PVI STA: 27+10 PVI ELEV: 108.07 K: 80.0 26+60 BVC
109.87
27+60 EVC
105.65 100.0' VC PVI STA: 24+00 PVI ELEV: 119.20 K: 61.1 23+60 BVC
121.16
24+40 EVC
117.76 80.0' VC -4.85% OG PG -4.90%
24+48 (BB) 117.48
26+08 (EB) 111.73
SD
SD
SD
SD
SD
SD
SD
SD
FM
FM
FM
FM
FM
FM
FM
FM
FM 3G 3H 3I 3C 3D 3J 3F
OIL

PIPELINE CONTINUES TO EAST
30" RCP
36" RCP
42" RCP
18" CMP
30" CMP
36" TO 30" ELBOW REDUCER
36" CMP
36" CMP
4" HDPE

COM COM COM
COM

COM COM

COMMUNICATIONS CONTINUES

IN RAILROAD CORRIDOR
SD
SD
SD
SD
SD
SD
SD
SD
COM
COM
COM
COM
COM
COM 125 150 175 25 50 75 75 75 100 100 100 25 50 75 75 100 100 125 125 150 150 155 160 160 85 90 50 75 100 100 125 125 150 10 125 d.i. str.lt. d.i. hwy sign mrkr str.lt. hwy sign d.i. down drain
box culvert
rusty 36" CMP
hwy sign d.i. sewer siphon d.i. d.i. /\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\ d.i.
ditch
ditch
hwy sign oil marker oil marker concrete sea wall
end of sea wall conc. inlet old phone pipe
rusty 36" CMPmci fiber optic marker rrmarker rr marker TT 04 TT 05 TT 06 TT 07 TT 08 TT 09 TP 06 TP 10 TP 13 TP 14 DH 02 TP 24 DH 03 TP 23 TP 22 TP 15 DH 01 DH 07a DH 07b mh broken concrete rubble 4" PVC concrete sea wall
/\ /\
/\ /\ /\ /\
/\
/\ /\ /\
/\
/\
/\ /\ /\ /\
/\ /\
/\
/\
/\
/\
/\ /\ /\ /\ dense brush dense brush conc. wind sock conc. likely over pipeline conc. conc. conc. rr ballast
rr ballast
rr ballast
rr ballast
down drain
wood ret. wall (failed)
hwysign mrkr oil marker hwy sign hwy sign wv
wave
overhead
wave
overhead
51-229 LT
51-229 RT old R.R. box culvert
UPRR
COUNTY
(COUNTY)
R/W
(COUNTY)
R/W
(COUNTY) R/W
(COUNTY) R/W R/W (UPRR) R/W (UPRR) R/W (UPRR) (UPRR)
R/W
(UPRR)
R/W
(UPRR)
23 24
25 26
27 28
29 30
R/W
(STATE)
R/W
(STATE)
R/W
(UPRR)
R/W
(UPRR)
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)

R/W (UPRR)
(STATE)
R/W
(STATE)
R/W
(STATE)

EASE RR

EASE RR
R/W
R/W
R/W
R/W
R/W
R/W
R/W
UPRR
PROPERTY APN 001-220-100 APN 001-220-092 (SOUTHERN PACIFIC TRANSPORTATION CO.) APN 001-010-032 APN 001-220-092 (SOUTHERN PACIFIC TRANSPORTATION CO.) STATE: DOT-RW83 R 0.3 10303

72.69' traxbc
10307

73.34' trax
UPRR
101 SB
101 NB
UPRR CP CP CP "BENCH-01" LINE CP ES ES ES (EXITING) ES "MSEW" LINE"FL-02" LINE MSE WALL (SEE NOTES) "FL-01" LINE ES 304+55.43
304
200
201
202
203
700
701
702
21 22
23 24
25 26
27 28
29 30
31 32
400
401
109 110 111
112
113
114
115
116
117
23+37.15 BC
26+11.09 BC
24+32.29 EC
EC
27+16.50
8'
16'
7' 14'
7'
16'
8' "O.A." LINE
26+08 EB
24+48 BB "OVERLOOK AREA" SEE NOTES 150 125 100 125150 75100 125 65 75 80 85 90 60 60 75 100 80 85
90 95 105
SD
SD
SD
E
36" RCP
E 125
31 32
(SOUTHERN PACIFIC
TRANSPORTATION CO.) "BENCH-01"
26+08 (EB)
SD conc.

R/W
(UPRR) 0.0% 1.0% 2.0% -1.0% -2.0% 2.0% (LT) -2.0% (RT) -1.0% (LT/RT) 2.0% (RT) 1.0% (RT) -2.0% (LT) -1.0% (LT) AXIS OF ROTATION 24+40
-1.0%
23+50
-2.0%
24+00
-2.0%
26+20
-1.0%
26+50
-2.0%
27+50
-2.0%
27+75
-1.0%
23+50

2.0%
23+75

2.0%
24+18.33

0.0%
26+38.33

0.0%
26+75

2.0%
27+50

2.0%
27+75

1.0% 0.0% 1.0% 2.0% -1.0% -2.0% NORTH
MATCHLINE - STA 30+90 SEE NEXT SHEET
MATCHLINE - STA 23+10 SEE PREVIOUS SHEET
0 50' 100' SCALE 1"=50' H 1"=30' V LAYOUT LO-02 NOTES: 1. SEE CONSTRUCTION DETAILS FOR GRADING OF OVERLOOK AREA. 2. SEE CONSTRUCTION DETAILS FOR LAYOUT OF MSE WALL. THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 LO-02
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
LAYOUT "CRT" LINE "CRT" LINE
11 of 119
CP/SPK 28 63.57' CP/PK
FM
FM
FM
FM
SD COM
COM
COM
COM 50 75 100 100 125 125 50 75 100 100 125 125 25 50 75 100 100 65 150 5 10
5 10 10 65 65 mrkr
rusty 36" CMP d.i. gatestr.lt. ditch str.lt.
ditch
hwy sign conc. inlet old phone pipe
rusty 36" CMP
conc. retaining wall
failed conc. retaining wall
bridge ruins
asphalt ramp TT 01 TT 02 TT 03 TT 04 TP 11 TP 12 TP 13 DH 06TP 19 DH 04 DH 05 DH 03 TP 22 TP 21 TP 20 TP 18 TP 16 TP 17 TP 15 mh mh 4" PVC
conc & rip-rap outfall dense brush dense brush conc. conc. conc. conc. hwy sign hwy sign hwy signwall ruins
wood ret. wall (failed) mrkr mrkr mrkr mrkr mrkr mrkr
questionable
landslide debris
questionable
landslide debris
conc. ret. wall
bio. swale
sidewalk old R.R. box culvert old R.R. box culvert
path
wood fence
(COUNTY) R/W
(COUNTY) R/W
(COUNTY)
R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W 15 17 16 18
19 20
21 22
23 R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
(UPRR) R/W (STATE)
R/W
R/W
R/W
R/W

R/W R/W RINCON COUNTY PARK
37+50 CONFORM
101 SB
101 NB
NB ON-RAMP BATES RD.

SB OFF-RAMP BATES RD. CP CP "FL-02" LINE "FL-01" LINE ES ESMSE WALL (SEE NOTES) TRAILHEAD (SEE NOTES) BUTTRESS FILL (SEE NOTES) 202
203
204
205
206
207
701
702
31 32
33 34
35 36
37 38
116
117
118
119
120 121
BC
32+50.23
BC
35+01.92
EC
33+33.76
EC
37+13.95 500
501
502
503
504 APN 001-220-101 STATE: DOT-RW83 R 0.3 APN 001-220-100 8'
16' "SHD" LINE LANDSLIDE DEBRIS (SEE NOTES) 125150 75100 125 50 75100 65 90 60 60 PVI STA: 36+20 PVI ELEV: 64.03 1.0% (RT) -1.0% (LT) AXIS OF ROTATION 37+50

1.0%
37+50
-1.0% 75 100 75100
103.3

89.20 91.8

84.36 81.5

79.52 70.3

74.68 66.9

69.84 64.7

65.27 64.7
100.6

86.78 64.94

86.4 81.94

73.6 77.10

67.0 72.26

64.0 67.42

64.7 64.49

64.0 65.50 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 37+50

65.50 -4.84% 1.13% PVI ELEV: 64.03 K: 16.8
35+70 BVC

66.45 36+70 EVC

64.60 100.0' VC
OG
PG OG PG 0.0% 1.0% 2.0% -1.0% -2.0% 0.0% 1.0% 2.0% -1.0% -2.0% NORTH MATCHLINE - STA 30+90 SEE PREVIOUS SHEET
0 50' 100' SCALE 1"=50' H 1" = 30' V LAYOUT LO-03 NOTES: 1. UTILITIES EAST OF RINCON PARK CUL-DE-SAC NOT SHOWN. 2. SEE CONSTRUCTION DETAILS FOR LAYOUT OF MSE WALL. 3. SEE CONSTRUCTION DETAILS FOR BUTTRESS FILL DETAILS. 4. SEE CONSTRUCTION DETAILS FOR LAYOUT OF TRAILHEAD. 5. SEE BENGAL'S GEOTECHNICAL REPORT FOR THE PROPOSED RINCON BEACH MULTI-USE TRAIL. THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 LO-03
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
LAYOUT "CRT" LINE
12 of 119
5075 100
109+50

70.99 112+36.03

68.11 115+24.42

65.74 115+47.23

66.20 1.99% -1.01% -0.82%

72.1 70.99

71.5 70.49

70.9 69.98

70.4 69.48

69.9 68.97

69.3 68.47

68.9 67.99

68.4 67.58

67.9 67.17

67.5 66.76

67.5 66.35

67.4 65.94

67.5 66.2

65.7 65.2

64.8 64.5

64.4 64.6

64.7 64.5

64.3 60.3 108+50 109+00 110+00 111+00 112+00 113+00 114+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 OG
PG OG PG 100 125 150 175 100 125 150 175
157.0
159.0
157.91
156.5
154.92
153.9
151.93
150.9
148.94
147.3
145.95
144.6
142.96
141.6
139.97
138.2
136.98
135.2
133.99
132.2
131.00
128.7
127.13
124.7
123.26
121.0
119.40
117.7
115.53
114.4
111.66
109.7 200+00 201+00 202+00 203+00 204+00 205+00 206+00 207+00 200+15
160.00
205+00
131.00
207+65
110.50
-5.98%
-7.74%
OG
PG OG PG 150 175 200 225 250 275 150 175 200 225 250 275 207.2
207.18
207.4
199.12
199.1
189.60
188.5
178.97
181.7
172.22
179.8
169.71
176.3
167.26
173.8
164.81
167.4
162.36
160.2
159.91 300+00 301+00 302+00 303+00 304+00
300+00
207.18
304+55.43
159.65
-15.45%
-21.39%
-4.90% PVI STA: 300+65 PVI ELEV: 197.13 K: 16.0
300+17.50 BVC
204.47
301+12.50 EVC
186.97 95.0' VC PVI STA: 301+76.29 PVI ELEV: 173.33 K: 3.6 301+46.29 BVC
179.74
302+06.29 EVC
171.86 60.0' VC
OG

PG OG PG
0 50' 100' SCALE 1"=50' H 1" = 30' V PROFILES P-01 PROFILE "FL-02" LINE PROFILE "BENCH-01" LINE PROFILE "FL-01" LINE THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 P-01
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB

PROFILES
13 of 119
50607080 50607080
700+70

55.00 701+70

55.00 -40.00% 0.00% 7.50% -1.33%
700+70

67.67 701+70

66.33 700+50 701+00 702+00 FG1 BW OG TW
700+85

59.00 701+30

59.00 701+70

62.00 700+70

65.00 SD SD COM COM COM COM COM 100
rusty 36" CMP conc. inlet old phone pipe TT 04 DH 03 TP 15 4" PVC wood ret. wall (failed) old R.R. box culvert R/W R/W R/W R/W R/W R/W R/W 700+70 N:1963469.7256 E:6114525.4021 BEG. WALL
701+70 N:1963389.7231 E:6114585.3987 END WALL CP "MSEW" LINE "FL-01" LINE CP "CRT" LINE 701 702 31 32 116 65 90 60 60 NORTH 0 10' 20' SCALE 1"=10' H 1"=10' V CONSTRUCTION DETAIL MSE WALL PLAN AND PROFILE C-01 NOTES: 1. THIS PLAN SHEET ACCURATE FOR RETAINING WALL WORK ONLY. THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 C-01
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB LEGEND CP = CATCH POINT / DAYLIGHT TW = TOP OF WALL BW = BOTTOM OF WALL OG = ORIGINAL GRADE PG = PROFILE GRADE FG1 = FINISHED GRADE AT FACE OF WALL FG2 = FG AT TOE SLOPE OF "CRT" LINE (SEE LAYOUT SHEETS)

CONSTRUCTION DETAIL
14 of 119
VAR PG(FG1) "WALL-01" LINE 2' 8.5' 10.5' PG(BW)

PG(TW) OG

1.25:1 FG (TOE SLOPE "CRT" LINE)
1:1 CP 5% 8' 8' 10' 10' 10' 12' 12' 12' 12' 12' 12' 6' 6' 6' 1 ≤ 1' (TYP) ≤ 0.5' (TYP)
1 12
2 4
3 OG SOIL REINFORCEMENT NOT SHOWN
5 CP
x
x
x
x
x
x FL-01
6 EL. 55
0 2' 4' SCALE 1"=2' H 1"=2' V NOTES: 1. REINFORCED SOIL FOUNDATION (ENCAPSULATED WITH GEOTEXTILE) 2. PLACE POLECRAFT FENCE AT TOP OF WALL 3. EXISTING COMMUNICATION LINE. PROTECT IN PLACE 4. GEOTEXTILE FILTER FABRIC 5. ALL GEOGRID MIRAGRID 5XT (OR APPROVED EQUAL) 6. CONCRETE MASONRY UNIT THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 C-02
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB CONSTRUCTION DETAIL MSE WALL SECTION C-02

CONSTRUCTION DETAIL MSE WALL SECTION
15 of 119

COM COM COM
COM
COM TT 06 DH 01 /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\
/\
/\ /\ /\
UPRR
COUNTY
R/W
(STATE)
R/W
(UPRR)
R/W
(UPRR)
(UPRR)
R/W
(UPRR)
(COUNTY)

EASE RR

EASE RR
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
N52° 41' 33.71"E 67.40'
-5.0% DI: EL. 108.5
N37° 18' 26.29"W 211.91' RIGHT-OF-WAY ABUT. 2 GRADING
1 4 TON BOULDER WALL
1 4 TON BOULDER WALL (SEE NOTES) 110
125
115
120
130
100
125
95 105
110
115
120
130
100
95 105
110
-1:1.2 FL N41° 19' 47.21"W 111.91'
E:6114320.57 N:1963928.63
110.00
E:6114266.97 N:1963887.76
109.00
E:6114340.87 N:1963803.73
110.00
E:6114344.11 N:1963805.75
110.00
E:6114333.90 N:1963910.64
110.00
+51 END WALL
+69 BEG WALL
+95 END WALL
+16 BEG WALL
110
26 27
400 111 100
85 90
95 105
E:6114235.15 N:1963863.51

75.00 E:6114303.75 N:1963780.56

75.00 -1:1.2 SLOPE 1:1.2 SLOPE 1:1.25
110
110 /\ /\ /\ COM
R/W
401
112 COM COM

COM COM COM COM
COM
COM TT 06 TT 07 DH 01 /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\
/\
/\ /\ /\
/\
/\
/\
/\
/\
/\
/\
/\
UPRR
COUNTY
R/W
(STATE)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
(UPRR)
(COUNTY)
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
N52° 41' 33.71"E 67.40'
-5.0% DI: EL. 108.5
N37° 18' 26.29"W 211.91' RIGHT-OF-WAY
1 4 TON BOULDER WALL
1 4 TON BOULDER WALL (SEE NOTES) 110
75 100
100
80 80
85 85 90
90 95
95 125
115
120
130
125
115
120
130
100
95 105
110
-1:1.2 FL N41° 19' 47.21"W 111.91'
E:6114320.57 N:1963928.63
110.00
E:6114266.97 N:1963887.76
109.00
E:6114340.87 N:1963803.73
110.00
E:6114344.11 N:1963805.75
110.00
E:6114333.90 N:1963910.64
110.00
E:6114206.36 N:1963967.30
104.00
+51 END WALL
+69 BEG WALL
+95 END WALL
+16 BEG WALL
110
26 27
400 109 110 111 75 100
80 85
90 95 105
105
110
E:6114181.75 N:1963938.99

75.00 E:6114235.15 N:1963863.51

75.00 E:6114303.75 N:1963780.56

75.00 -1:1.2 SLOPE 1:1.2 SLOPE 1:1.25
110
110 NORTH
0 10' 20' SCALE 1"=10' THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 C-03
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB CONSTRUCTION DETAIL OVERLOOK AREA GRADING C-03
CONSTRUCTION DETAIL NOTES: 1. SEEOVERLOOK AREA SECTIONS FOR MORE INFORMATION 2. SEE TYPICAL SECTION SHEETS FOR TRAIL GEOMETRY 3. SEE RIGHT-OF-WAY MAP SHEET FOR MORE INFO 4. SEE FENCING PLANS FOR MORE INFO 5. GRAVEL SHALL BE CALIFORNIA GOLD WITH STABILIZER 6. SEE BOULDER WALL DETAIL FOR MORE INFO A
A
B
B
C
C
D

D GRAVEL CONCRETE BRIDGE BIKE RACKS
16 of 119
*SLOPE VARIES FROM -1.0% (@26+18.10) TO
100% (@26+85) VAR 5' 5' 3'
VAR EL: 1105' VAR PG ETW ETWES HP "CRT" LINE CP R/W CP OG x
x
x SR% R/W 5.0% "O.A." LINE
* SEE TYPICAL SECTIONS FOR MORE INFORMATION REGARDING TRAIL GEOMETRY x
x
x
x
x
x 6.5'
1 4 TON BOULDER WALL
x
x
x VAR OG TOS
1:1.2 ABUT. 2 GRADING SEE BRIDGE PLANS TOS
x
x
x CP"FL-01" LINE CP PGCP COMMUNICATION LINE
O
O
x
x
x LOWER SLOPE REINFORCEMENT (SEE NOTE)
FL 108.5 TOS
x
x
x VAR
LOW PT. 3' EL: 110 5' ETWES HP
x
x
x VAR
1 4 TON BOULDER WALL
0 10' 20' SCALE 1"=10' H 1"=10' V CONSTRUCTION DETAIL OVERLOOK AREA SECTIONS C-04 THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 C-04
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
CONSTRUCTION DETAIL SECTION A - A SECTION B - B NOTES: 1. SEE FENCING SHEETS FOR MORE INFORMATION 2. SEE SLOPE REINFORCEMENT SHEETS FOR MORE INFORMATION SECTION C - C SECTION D - D 17 of 119
28 63.57'
FM
FM
FM
SD

COM COM
COM

COM COM
COM
COM
COM
COM 25 50 75 75 100 100 25 50 75 100 125 125 150 150 155 160 160 50 75 100 100 125 125 50 75 100 100 125 125 50 75 100 100 65 150 10 10 65 65 mrkr rusty 36" CMP d.i. gatestr.lt. ditch
ditch
ditch
concrete sea wall
end of sea wall conc. inlet old phone pipe
rusty 36" CMP
conc. retaining wall
failed conc. retaining wall
bridge ruins
fiber optic TT 01 TT 02 TT 03 TT 04 TT 05 TT 06 TT 07 TP 12 TP 13 TP 14 DH 02 DH 06 DH 04 DH 05 TP 24 DH 03 TP 23 TP 22 TP 21 TP 18 TP 16 TP 17 TP 15 DH 01 mh mh 4" PVC
conc & rip-rap dense brush dense brush dense brush conc. wind sock hwy sign rr ballast
rr ballast wall ruins
wood ret. wall (failed) mrkr mrkr mrkr mrkr
questionable
landslide debris
questionable
landslide debris old R.R. box culvert old R.R. box culvert wood fence APN 001-220-100 101 SB
SB OFF-RAMP BATES RD.
200
201
202
203
204
205
206
207
700
701
702
26 27
28 29
30 31
32 33
34 35
36 37
38 400
401 109 110 111
112
113
114
115
116
117
118
119
120 121 500
501
502
503
504 APN STATE: DOT-RW83 R 0.3 APN 001-220-100 100 125150 75100 125 50 75100 65 75 80 85 90 60 60 75 100 80 85
90 95 105 63.57' CP/PK TP 11 TP 19 TP 20 conc & rip-rap outfall APN 001-220-101 COM LINE "FL-01" LINE PG

1.25:1 CP "CRT" LINE PG HP FL
1:1 CP 1.0% "FL-02" LINE PG CP NORTH
0 50' 100' SCALE: AS NOTED CONSTRUCTION DETAIL SLOPE REINFORCEMENT C-04 NOTES: 1. SEE DETAILS, NEXT SHEET, FOR GRID TYPE, PLACEMENT AND LENGTH. 2. LIMITS OF LOCATION D TO BE DETERMINED DURING CONSTRUCTION. SEE BENGAL'S GEOTECHNICAL REPORT FOR THE PROPOSED RINCON BEACH MULTI-USE TRAIL STATION: 109+63 TO 111+60 ("FL-01" LINE) STATION: 111+60 TO 115+47.14 AND 116+46.61 TO 119+50 ("FL-01" LINE) STATION: 111+60 TO 119+50 ("FL-01" LINE) STATION: ≈33+00 TO 35+00 (SEE NOTES) ("CRT" LINE) STATION: 900+15 TO 900+48.10 ("BFILL" LINE) THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 C-05
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB LOCATION B: "KEYWAY" LOCATION C: LOWER-SLOPE LOCATION D: MID-SLOPE LEGEND: LOCATION A: BUTTRESS CONSTRUCTION DETAIL LOCATION E: BUTTRESS SECTION VIEW SCALE: 1" = 10' H&V PLAN VIEW SCALE: 1" = 10' 18 of 119
COM LINE (PROTECT IN PLACE) "FL-01" LINE PG

1.25:1 CP "CRT" LINE PG HP FL
1:1

1.25:1

0.67' CLR (TYP) 4.67' 12' ±
1:1 OG 3' (TYP) CP CP FG REINFORCED FILL (SEE NOTE)
0 50' 100' SCALE 1"=4' H 1"=4' V CONSTRUCTION DETAIL SLOPE REINFORCEMENT C-05 NOTES: 1. USE TENSAR "GRADED SIERRA SLOPE" REINFORCED FILL THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 C-06
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB LEGEND: MIRAGRID 5XT GEOGRID (OR APPROVED EQUAL)

CONSTRUCTION DETAIL
19 of 119
1%
90% EL: 15 EL: 64 15' EL: 30 5% CP CP "BFILL" LINEPG "CRT" LINE PG HP

1.25:1 5' OG "FL-01" LINE PG
0 50' 100' SCALE 1"=4' H 1"=4' V CONSTRUCTION DETAIL BUTTRESS FILL C-06 NOTES: 1. THIS DRAWING IS FOR THE CROSS SECTION FOR THE BUTTRESS FILL SHOWN, ONLY. 2. xxxxxxx THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 C-07
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB LEGEND:
1 4 TON RSP

CONSTRUCTION DETAIL
20 of 119
184
PROFILE "TH" LINE
190 190 800+00 181.56800+64.56 183.53

3.04% 181.5 181.56 181.9 181.87 182.4 182.17 182.6 182.48 182.8 182.78 183.0 183.09 183.2 183.39 799+90 800+00 800+90
PROFILE "TH-LT" LINE
180
190
180
190 10+00 181.35 10+19.37 182.20 10+85.81 183.61 181.3 181.35 181.5 181.79 181.8 182.21 182.2 182.42 182.4 182.64 182.6 182.85 182.8 183.06 183.1 183.27 183.3 183.49 9+90 10+00 10+90

4.41%

2.12%
PROFILE "TH-RT" LINE
180
190
180
190 20+00 181.72 20+17.04 181.82 20+60.53 183.45

0.57%

3.75% 181.7 181.72 181.8 181.78 182.1 181.93 182.6 182.30 182.8 182.68 183.0 183.05 183.2 183.43 19+90 20+00 20+90
8'
&
VAR
8'
&
VAR

PG (TH) OG
CP
5%
VAR

A PG (TH-RT)
CP

PG (TH-LT) A
FL FL
"TH" LINE
10%
mh bell
16'
2'SAWCUT
(E) EP
16'
800+63.30 END
("TH" LINE) =
10+40 BEG
("CRT" LINE)
181
182
183
183
183
182
182
"CRT" LINE
CP
800+00 BEG.
=10+40 "CRT" LINE 800+64.56 END
800+13.96 BC
800+58.57 EC
10+00 BEG.
10+85.81 END
10+79.81 EC
10+30.24 PRC
"TH
"
LINE
"TH-RT
"
LINE
20+00 BEG.
20+60.53 END 20+20.12 BC 20+17.04 EC
20+54.54 EC N32°31'21"E 13.96'
R =3 5.0 0 '
L =4 4.61'
N74°26'56"W 5.99'
R =2 0.0 0 '
L =3 0.2 4
'
N74°26'56"W 5.99'
R
=
1 0.0 0 ' L
=
1 7.0 4 ' N32°31'21"E 3.09'
R =2 7.0 0 '
L =3 4.41'
N74°26'56"W 5.99'
R =4 3.0 0 '
L =4 9.5 7 '

BALLARD
(SEE NOTES)
182
183
183
184
"TH-LT
"
LINE
MISC. AC

0.4' HMA

0.5' AB

WEST TRAILHEAD CONSTRUCTION DETAILS
NOTES

1. THESE PLANS ARE FOR THE LAYOUT OF EAST AND
WEST TRAILHEADS ONLY.

2. FURNISH AND INSTALL 36"H x 6"Ø "INTERNAL
REMOVABLE CARBON STEEL" BOLLARD
(1-800-BOLLARDS OR APPROVED EQUAL).

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
C-8
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-trailhead dtls.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 NORTH
0 10' 20'
SCALE 1"=10' H
1"=10' V

CONSTRUCTION DETAILS

WESTERN TRAILHEAD
C-08 CONSTRUCTION DETAILS

CARPINTERIA AVE
CONSTRUCTIONS NOTES:

A. CALTRANS TYPE A1 CURB
21 of 119
d.i.
gate
bridge ruins
TT 01
DH 06
TP 18
mh /\ /\ /\ /\ /\ /\ /\ /\
/\
/\
/\
/\
/\ /\ /\ /\ /\ /\
dense
brush
old R.R.
box
culvert
wood fence
FL
8' 36
37 8'36+20 8.0' RT (BEG. TRANS) EC
37+47.40 22.1' RT BCR
VAR
10'
10'

6.5'
5'
HP
ES
121 121

FLEXABLE

PAVEMENT

MARKERS

FLEXABLE

PAVEMENT

MARKERS
"FL-01" LINE D.I. (PROP) "CRT" LINE
N40° 26' 55.49"W
130.202'
FL
CP
ES
65 70
75 8085
45 50 55 60
65 70
7580
85 505560
65 65
65 70 75 80 85
70 2' 50
55 60
55 60
65 GUTTER
CP
CP "SHD" LINE 65
65 R10'
R30'

EAST TRAILHEAD CONSTRUCTION DETAIL
SCALE: 1" = 8'
NORTH 0 8' 16'
SCALE 1"=8' H

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 C-9
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-trailhead dtls.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 CONSTRUCTION DETAILS

CONSTRUCTION DETAILS

EASTERN TRAILHEAD
C-09

PARKING LOT PAVING

CONCRETE TRAIL
LEGEND:

CALTRANS TYPE A1 CURB
22 of 119
d.i.
gate
bridge ruins
mh
asph.
conc. ret. wall
bio. swale
sidewalk
path
wood fence
SAWCUT
D.I. (PROP) R10'
R30'

EAST PARKING AREA CONSTRUCTION DETAIL
SCALE: 1" = 20'
NORTH 0 20' 40'
SCALE 1"=20' H

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 C-10
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-trailhead dtls.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 CONSTRUCTION DETAILS

CONSTRUCTION DETAILS

EASTERN TRAILHEAD
C-10
23 of 119
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD SD
SD SD
SD SD
SD SD
SD SD
SD
SD
SD SD
SD
SD SD
SD
SD SD
SD
SD SD
SD
SD SD
SD
SD SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD

SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD

SD SD SD SD SD SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD

SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD

SD SD SDSD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD SD

SD SD SD SD
SD SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD

SD SD SD SD SD
SD SD
SD SD
SD
SD

SD SD SD

SD SD SD SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD SD

SD SD SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD
SD

SD SD SD

SD SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD SD
SD

SD SD SD
SD SD
SD SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD

SD SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD

SD SD SD SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD

SD SD SD SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD

SD SD SD

SD SD SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD

SD SD SD SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD SD

SD SD SD SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD

SD SD SD

SD SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD
SD

SD SD SD
SD SD
SD SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD SD

SD SD SD SD
SD
SD
SD SD
SD SD
SD SD
SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD
SD SD
SD
SD

SD SD SD
SD
SD
SD SD
SD

SD SD SD SD

SD SD SD SD
SD
SD
SD FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM
FM
FM
FM
FM
FM FM
FM
FM
FM
FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM
FM FM
FM FM
FM FM
FM
FM FM
FM FM
FM FM
FM FM
FM
FM FM
FM FM
FM FM
FM
FM
FM
FM FM
FM FM
FM
FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM
FM

FM FM FM FM
FM

FM FM FM
FM

FM FM FM FM

FM FM FM FM
FM

FM FM FM
FM

FM FM FM FM
FM

FM FM FM
FM

FM FM FM FM
FM

FM FM FM
FM

FM FM FM FM
FM

FM FM FM FM FM FM

FM FM FM FM FM FM

FM FM FM FM FM FM FM

FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM

FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM

FM FM FM FM FM

FM FM FM

FM FM FM FM FM

FM FM FM FM FM

FM FM FM

FM FM FM FM FM

FM FM FM FM FM

FM FM FM

FM FM FM FM FM FM

FM FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM

FM FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM

FM FM FM
FM FM
FM FM
FM FM

FM FM FM
FM

FM FM FM
FM

FM FM FM
FM

FM FM FM FM
FM
FM

FM FM FM FM
FM
FM
FM

FM FM FM
FM
FM
FM

FM FM FM
FM
FM
FM

FM FM FM FM
FM
FM

FM FM FM FM
FM
FM

FM FM FM FM
FM
FM

FM FM FM FM
FM
FM

FM FM FM
FM
FM

FM FM FM FM
FM
FM

FM FM FM FM
FM
FM

FM FM FM
FM
FM
FM

FM FM FM
FM
FM
FM

FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM

FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM

FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM FM
FM FM
FM 3G 3H 3I 3J 3k 3N 3O

OIL OIL OIL
OIL

OIL OIL

OIL OIL OIL OIL

OIL OIL OIL

OIL OIL OIL OIL

OIL OIL OIL

OIL OIL OIL OIL
OIL

OIL OIL
OIL

OIL OIL OIL

OIL OIL OIL

OIL OIL OIL OIL

OIL OIL OIL

OIL OIL OIL OIL

OIL OIL OIL
OIL

OIL OIL
OIL
OIL

OIL OIL
OIL

OIL OIL

OIL OIL OIL OIL

OIL OIL OIL

OIL OIL OIL OIL

OIL OIL OIL

OIL OIL OIL OIL
OIL

OIL OIL
OIL

OIL OIL OIL
OIL

OIL OIL

OIL OIL OIL OIL

OIL OIL OIL

OIL OIL OIL OIL

OIL OIL OIL

OIL OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL

OIL OIL OIL OIL
OIL

OIL OIL OIL OIL
OIL

OIL OIL OIL OIL OIL

OIL OIL OIL OIL OIL
OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL
OIL
OIL

OIL OIL OIL OIL OIL OIL OIL OIL

OIL OIL
OIL

OIL OIL OIL OIL OIL OIL OIL

OIL OIL OIL
OIL

OIL OIL OIL OIL OIL OIL OIL

OIL OIL OIL
OIL

OIL OIL OIL OIL OIL OIL

OIL OIL OIL OIL
OIL

OIL OIL OIL OIL OIL
OIL

OIL OIL OIL OIL
OIL

OIL OIL OIL OIL OIL
OIL

OIL OIL OIL OIL

OIL OIL OIL OIL OIL
OIL

OIL OIL

OIL OIL OIL OIL OIL OIL OIL

OIL OIL OIL OIL

OIL OIL OIL

OIL OIL OIL OIL OIL OIL OIL

OIL OIL OIL OIL

OIL OIL OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL
OIL
OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL
OIL
OIL
OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL
OIL
OIL
OIL
OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL COM
COM
COM
COM
COM
COM
COM
COM
COM

COM COM
COM
COM

COM COM COM COM
COM
COM
COM
COM

COM COM

COM COM

COM COM
COM
COM
COM

COM COM

COM COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM

COM COM
COM
COM
COM
COM
COM
COM
COM

COM COM
COM

COM COM
COM

COM COM
COM

COM COM
COM

COM COM
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
ABANDONED 6"
36" RCP
36" RCP
42" RCP
18" CMP
30" CMP
36" TO 30" ELBOW REDUCER
36" CMP
30" RCP
18" RCP
4" HDPE
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W W
W
W
W
W
W W
W
W W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W

W W W W W W W W W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
4" HDPE
COM

COM COM
COM

COM COM

COM COM
COM
COM
COM
COM
COM
COM

COM COM

COM COM
COM
COM
COM
COM
COM
COM

COM COM

COM COM

COM COM
COM
COM
COM
COM

COM COM

COM COM

COM COM
COM
COM
COM
COM
COM
COM
COM

COM COM COM COM

COM COM

COM COM COM COM COM COM

COM COM

COM COM COM COM COM COM COM

COM COM

COM COM COM
COM
COM

COM COM

COM COM

COM COM

COM COM COM COM COM COM COM

COM COM

COM COM COM COM
COM
COM

COM COM COM

COM COM COM COM COM COM COM

COM COM

COM COM COM COM COM COM COM
COM

COM COM

COM COM COM COM COM COM

COM COM
COM

OIL PIPELINE ABANDONED
SD SD
SD
SD
SD
SD
SD

SD SD SD SD SD SD SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD
SD
SD
SD SD
SD
SD

SD SD SD SD SD SD SD
SD
SD
SD
SD
SD

SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD SD SD

SD SD SD SD SD SD SD SD SD SD

SD SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD

SD SD SD

SD SD SD
SD
SD
SD
SD SD
SD

SD SD SD
SD SD
SD

SD SD SD

SD SD SD
SD
SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD

SD SD SD
SD SD
SD
SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD
SD SD
SD
SD
SD
SD

SD SD SD
SD
4" HDPE
COM
COM
COM
COM
COM

COM COM COM COM
COM
COM
COM
COM
COM

COM COM
COM
COM
COM
COM
COM
COM

COM COM COM COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM
COM 150 175 175 200 150175200 125 150 175 200 205 210 210 75 100 175 200 125 str.lt. str.lt. hwy sign down drain str.lt. CB (6)wm d.i. d.i. d.i. d.i. d.i. /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\
/\ /\
/\
/\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\ /\
/\ /\
/\
/\
/\ /\ /\
/\ /\ /\
/\ /\
/\ /\
/\ /\ /\
/\ /\ /\ /\
/\
/\ /\
/\ /\ /\
/\
/\ /\ /\
/\
/\ /\
/\
/\ /\ /\
/\ /\ /\
/\
/\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\ /\ /\
/\ /\ /\ /\
/\ /\
/\
/\ /\ /\ /\
/\ /\ /\
/\ /\
/\
/\
/\ /\ /\
/\ /\ /\
/\ /\
/\ /\
/\ /\ /\ /\ /\ /\ /\
/\
/\
/\
/\
/\
/\
/\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\
/\
/\ /\
/\ /\ /\
/\ /\
/\ /\
/\ /\ /\
/\ /\ /\ /\ /\
/\
/\
/\
/\
/\ /\ /\ /\ /\ /\ /\
/\ /\
/\ /\ /\ /\
/\ /\ /\ /\
/\
/\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\ /\ /\
/\ /\ /\ /\ /\ /\
/\
/\ /\ /\
/\ /\ /\ /\
/\
/\ /\
/\ /\ /\ /\
/\ /\ /\
/\
/\ /\ /\
/\ /\ /\ /\
/\ /\
/\ /\
/\ /\ /\ /\
/\
/\
/\ /\ /\
/\ /\ /\ /\
/\
/\ /\ /\ /\
/\ /\ /\ /\
/\ /\ /\ /\
/\
/\ /\ /\
/\ /\ /\
/\
/\ /\ /\ /\
/\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\
/\ /\
/\
/\
/\ /\ /\ /\
/\ /\
/\
/\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\ /\
/\
/\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\ /\
/\
/\ /\
/\
/\ /\ /\
/\
/\ /\ /\
/\
/\ /\ /\
/\
/\ /\ /\ /\
/\
/\ /\ /\ /\
/\
/\ /\ /\
/\
/\ /\ /\
/\
/\ /\ /\
/\
/\
/\ /\ /\ /\
/\
/\ /\ /\
/\
/\ /\ /\ /\ /\
/\
/\
/\ /\
/\ /\
/\ /\
/\ /\
/\
/\
/\ /\ /\ /\
/\ /\ /\ /\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\
/\ /\ /\ /\ /\
/\ /\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\ /\ /\
/\
/\ /\
/\ /\ /\ /\
/\
/\
/\ /\ /\ /\ /\
/\
/\
/\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\
/\ d.i. d.i. d.i. sign oil marker oil marker oil marker oil marker oil marker rr marker mh bell mh gte gate h20 valve nut 4"cyp 4"ironwood 6"cyp 5"cyp 10"pepper36"euc 36"euc 10"cyp 24"euc h2o mark TP 07 TP 01 TP 02 TP 05 TP 06 TP 10 TP 09 TP 03 DH 07a DH 07b DH 08 TP 08 2" clump-euc hwy sign dense brush dense brush dense brush asph. conc. conc. conc. h20 valve nut rr ballast
rr ballast
down drain
hwysign str.lt. oil marker hwy sign hwy sign misc. marker sign foc R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)

R/W(CITY)
R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)
R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY) R/W
(CITY)

R/W(CITY)

R/W(CITY)

R/W(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)

R/W(CITY)

R/W(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY)
R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY)
R/W
(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY)

R/W(CITY) R/W
(CITY)
R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)

R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)
R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)
R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)
(STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W

R/W(UPRR) R/W
(UPRR)

R/W(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
(UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR)
29 30
31 32
33 34
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) (STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) (STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W (STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W (STATE)
R/W
(STATE) R/W (STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W (STATE) R/W (STATE)
R/W
(STATE) R/W
(STATE) R/W (STATE)
R/W
(STATE) R/W (STATE) R/W
(STATE) R/W (STATE) R/W
(STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W (STATE) R/W
(STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W
(STATE)

R/W (STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W (STATE) R/W
(STATE)

R/W (STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)

R/W(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)

R/W(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W (CITY)
R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY)

R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY)

R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY)

R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W (CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY) R/W
(CITY)
CITY
COUNTY

CITY COUNTY

CITY COUNTY
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
(STATE) R/W R/W
(STATE)
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR EASE RR EASE RR EASE RR

EASE RR EASE RR EASE RR EASE RR

EASE RR EASE RR EASE RR EASE RR

EASE RR EASE RR EASE RR EASE RR

EASE RR EASE RR

EASE RR EASE RR

EASE RR EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR EASE RR EASE RR EASE RR

EASE RR EASE RR EASE RR EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR EASE RR

EASE RR

CALTRANS DEDICATES TO CITY

CARPINTERIA
AVENUE
10307

73.34' trax
101 SB
101 SB ON-RAMP
101 NB
101 SB ON-RAMP
304+55.43 300 301
302
303
304
11 12
13 14 15 16
17 18
19 20
21 22
23 24
25 175 175 150 175 200 175 200 150 125 NORTH
0 25' 50' SCALE 1"=50' H CONTOUR GRADING G-01 THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 G-01
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB

CONTOUR GRADING
24 of 119
SD SD

SD SD SD SD

SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD

SD SD SD
SD SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD SD SD

SD SD SD
SD SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD SD
SD

SD SD SD

SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD SD

SD SD SD SD SD SD SD
SD SD
SD
SD
SD 28 63.57' CP/PK
FM FM
FM FM

FM FM FM FM FM

FM FM FM FM FM FM
FM
FM

FM FM FM FM

FM FM FM
FM FM
FM
FM FM
FM FM
FM

FM FM FM FM FM FM FM
FM
FM
FM
FM
FM

FM FM FM FM FM FM
FM FM
FM
FM FM
FM
FM FM

FM FM FM

FM FM FM

FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM

FM FM FM FM
FM
FM
FM
FM
FM

FM FM FM
FM
FM FM
FM FM
FM
FM FM

FM FM FM
FM
FM
FM
FM
FM
FM
FM FM
FM
FM
FM
FM
FM
FM
FM
FM FM
FM
FM
FM FM
FM

FM FM FM
FM
FM FM
FM
FM
FM FM
FM

FM FM FM
FM
FM FM
FM
FM
FM
FM
FM FM
FM
FM FM

FM FM FM FM
FM
FM FM
FM
FM

FM FM FM FM FM
FM

FM FM FM
FM
FM
FM
FM

FM FM FM FM FM FM FM FM FM FM
FM
FM
FM
FM
FM
FM

FM FM FM
FM

FM FM FM
FM
FM
FM
FM
FM FM
FM
FM
FM FM

FM FM FM FM
FM
FM
FM
FM FM
FM

FM FM FM

FM FM FM FM FM FM FM FM FM FM FM
FM FM
FM FM
FM
FM
FM
FM
FM FM
FM
FM
FM
FM FM
FM FM

FM FM FM
FM
FM
FM
FM FM
FM FM
FM
FM FM
FM FM

FM FM FM
FM FM
FM
FM FM
FM FM
FM FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM

FM FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM FM
FM
FM
FM
FM FM

FM FM FM
FM FM
FM
FM
FM
FM FM
FM FM
FM
FM FM
FM
FM

FM FM FM
FM FM

FM FM FM FM

FM FM FM FM FM FM FM FM FM FM
FM
FM
FM
FM FM
FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM
FM
FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM
FM FM
FM
FM FM
FM
FM FM
FM
FM FM
FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM
FM
FM
FM FM
FM
FM
FM
FM
FM
FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM
FM FM 3I 3C 3D
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD

SD SD SD

SD SD SD SD
SD SD
SD
SD SD

SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD

SD SD SD SD SD SD

SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD

SD OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL
OIL
OIL
OIL
OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL
OIL
OIL
OIL
OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL

OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL OIL PIPELINE CONTINUES TO EAST 30" RCP
36" RCP
4" HDPE COM COM COM COM COM COM COM COM COM COM COM

COM COM COM COM
COM

COM COM
COM
COM

COM COM
COM

COM COM COM COM COM COM COM COM COM

COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM COM

COM COM COM

COM COM COM

COM COM COM COM

COM COM COM

COM COM COM

COM COM COM COM

COM COM COM

COM COM COM

COM COM

COM COM

COM COM COM COM COM COM COM

COM COM

COM COM

COM COM COM
COM

COM COM COM COM COM COM
COM

COM COM COM COM COM
COM
COM

COM COM COM COM COM
COM

COM COM COM COM COM COM
COM

COM COM COM COM COM
COM
COM

COM COM COM COM COM

COM COM COM COM

COM COM COM COM
COM

COM COM COM COM

COM COM COM COM COM

COM COM

COM COM

COM COM

COM COM
COM
COM
COM

COM COM

COM COM COM COM COM
COM

COM COM COM COM
COM
COM

COM COM COM COM COM COM COM
COM
COM
COM
COM
COM
COM
COM
COM

COM COM COM COM COM COM COM COM COM
COM

COM COM COM
COM

COM COM COM COM
COM

COM COM
COM
COM
COM
COM
COM
COM
COM
COM

COM COM
COM

COM COM

COM COM COM
COM

COM COM COM COM
COM

COM COM COM COM
COM
COM

COM COM COM

COM COM COM COM COM COM COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM

COM COM
COM
COM
COM

COM COM
COM
COM

COM COM COM
COM

COM COM
COM

COM COM
COM

COM COM

COM COM
COM

COM COM

COM COM COM COM
COM

COM COM COM COM COM
COM

COM COM COM COM COM
COM

COM COM COM COM COM

COM COM COM COM COM
COM

COM COM COM COM COM
COM

COM COM COM COM COM
COM

COM COM

COM COM

COM COM

COM COM

COM COM

COM COM COM
COM

COM COM COM

COM COM COM
COM

COM COM COM

COM COM COM COM COM
COM
COM
COM

COM COM COM COM COM COM COM
COM
COM
COM
COM
COM

COM COM COM COM COM COM COM

COMMUNICATIONS CONTINUES

IN RAILROAD CORRIDOR
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD SD
SD
SD
SD
SD
SD
SD
SD

SD SD SD

SD SD SD

SD SD SD
SD
SD SD

SD SD SD

SD SD SD
SD
SD
SD
SD SD
SD

SD SD SD
SD SD
SD

SD SD SD

SD SD SD
SD
SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD

SD SD SD
SD SD
SD
SD
SD SD
SD SD
SD

SD SD SD
SD
SD
SD
SD
SD
SD

SD SD SD
SD SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD SD

SD SD SD
SD SD
SD
SD
SD
SD
SD SD
SD
SD SD
SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD
SD

SD SD SD

SD SD SD SD

SD SD SD SD

SD SD SD SD

SD SD SD SD

SD SD SD SD

SD SD SD SD

SD SD SD SD

SD SD SD SD

SD SD SD SD

SD SD SD SD
SD SD
SD SD
SD SD
SD SD
SD SD
SD SD
SD SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
SD
SD
SD SD
COM
COM
COM

COM COM COM COM
COM
COM
COM
COM
COM
COM

COM COM
COM
COM
COM
COM
COM

COM COM COM COM
COM
COM
COM
COM
COM
COM

COM COM
COM
COM
COM
COM
COM

COM COM COM COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM
COM
COM

COM COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM
COM
COM

COM COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM

COM COM

COM COM
COM
COM
COM
COM
COM

COM COM COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM

COM COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM
COM 125 25 50 75 75 75 100 100 100 25 50 75 75 100 100 125 125 150 150 155 160 160 50 75 100 100 125 125 50 75 100 100 125 125 25 50 75 100 100 65 150 5 10
5 10
5 10
5 10 10 65 65 d.i. str.lt. d.i. hwy sign mrkr d.i.
rusty 36" CMP d.i. gatestr.lt. ditch sewer siphon d.i. /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\
/\ /\ /\ /\ /\
/\ /\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\
/\ /\
/\ /\ /\
/\
/\ /\ /\
/\
/\ /\
/\ /\ /\ /\
/\ /\ /\
/\
/\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\ /\ /\
/\ /\ /\
/\
/\ /\
/\
/\ /\ /\
/\
/\ /\ /\
/\ /\
/\
/\ /\
/\ /\
/\ /\ /\
/\ /\
/\ /\
/\
/\ /\
/\ /\ /\ /\
/\
/\ /\
/\
/\ /\
/\
/\ /\ /\
/\
/\ /\ /\ /\ /\
/\
/\
/\
/\
/\
/\
/\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\
/\ /\
/\ /\ /\
/\ /\
/\ /\ /\
/\ /\
/\
/\
/\ /\ /\ /\ /\
/\ /\
/\ /\ /\ /\ /\
/\ /\
/\ /\ /\ /\ /\ /\
/\ /\ /\
/\
/\ /\ /\
/\ /\ /\ /\
/\ /\
/\
/\ /\ /\ /\ /\ /\ /\
/\ /\
/\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\ /\ /\
/\
/\ /\ /\ /\
/\ /\
/\ /\
/\
/\
/\ /\ /\
/\ /\ /\ /\
/\
/\ /\ /\ /\
/\ /\ /\ /\
/\
/\
/\ /\ /\
/\ /\ /\ /\
/\
/\ /\ /\
/\ /\ /\ /\
/\
/\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\ /\ /\ /\
ditch
ditch
hwy sign oil marker concrete sea wall
end of sea wall conc. inlet old phone pipe
rusty 36" CMP
conc. retaining wall
failed conc. retaining wall
bridge ruins
asphalt ramp
fiber optic rrmarker rr marker TT 01 TT 02 TT 03 TT 04 TT 05 TT 06 TT 07 TP 10 TP 11 TP 12 TP 13 TP 14 DH 02 DH 06TP 19 DH 04 DH 05 TP 24 DH 03 TP 23 TP 22 TP 21 TP 20 TP 18 TP 16 TP 17 TP 15 DH 01 DH 07a DH 07b mh mh 4" PVC
conc & rip-rap outfall
/\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\/\
/\ /\ /\
/\ /\ /\
/\
/\ /\ /\ /\ /\
/\
/\ /\ /\ /\
/\
/\ /\ /\
/\ /\
/\
/\
/\ /\
/\ /\
/\
/\ /\ /\ /\
/\
/\ /\ /\ /\ /\
/\
/\
/\ /\
/\ /\ /\
/\ /\
/\ /\
/\ /\ /\
/\ /\
/\
/\ /\
/\ /\
/\ /\
/\
/\ /\
/\ /\
/\ /\
/\
/\
/\
/\ /\
/\ /\
/\ /\
/\ /\
/\ /\ /\
/\ /\
/\ /\
/\ /\ /\
/\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\/\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\
/\/\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\
/\/\ /\
/\
/\ /\ /\ /\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\ /\
/\
/\ /\ /\
/\ /\ /\
/\ /\ /\
/\
/\ /\
/\
/\ /\
/\ /\ /\ /\
/\ /\ /\
/\
/\ /\
/\
/\ /\
/\ /\ /\ /\
/\ /\ /\ /\ /\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\/\
/\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\
/\
/\ /\ /\ /\ /\
/\ /\
/\/\ /\
/\ /\ /\ /\ /\
/\ /\ /\ /\ /\
/\ /\ /\
/\/\
/\ /\ /\ /\ /\ /\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\
/\/\ /\ /\ /\
/\ /\
/\ /\
/\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\
/\ /\ /\ /\ /\ /\ /\ /\
/\
/\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\
/\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\
/\/\ /\ /\ /\ /\/\ /\ /\
/\/\ /\
/\/\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\
/\ /\ /\ /\ /\
/\/\ /\ /\ /\ /\
/\
/\ /\
/\ /\ /\ /\
/\ /\ /\
/\
/\ /\ /\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\
/\ /\
/\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\
/\
/\
/\ /\
/\ /\ /\
/\
/\
/\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\
/\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\
/\ /\
/\/\
/\ /\ /\ /\
/\ /\ /\ /\
/\ /\ /\ /\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\ /\
/\/\ /\
/\ /\
/\/\ /\
/\ /\
/\/\ /\ /\ /\
/\
/\ /\ /\ /\ /\
/\ /\
/\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\
/\/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\
/\/\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\
/\
/\
/\ /\ /\ /\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\
/\/\ /\ /\
/\/\ /\ /\
/\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\
/\ /\ /\ /\ /\ /\
/\ /\ /\ /\
/\/\
/\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\
/\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\
/\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\ /\
/\/\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\
/\ /\ /\ /\ /\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\/\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\
/\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\
/\ /\ /\ /\
/\
/\
/\ /\ /\ /\
/\
/\ /\
/\ /\ /\
/\
/\ /\ /\ /\
/\
/\ /\ /\ /\ /\ /\ /\
/\ /\ /\
/\ /\ /\ /\
/\ /\ /\
/\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\ /\ /\ /\ /\ dense brush dense brush dense brush dense brush conc. conc. conc. wind sock conc. likely over pipeline conc. conc. hwy sign hwy sign hwy sign rr ballast
rr ballast
rr ballast
rr ballast wall ruins
wood ret. wall (failed)
hwy
sign mrkr mrkr mrkr mrkr mrkr oil marker hwy sign hwy sign wv wave
overhead
wave overhead
questionable
landslide debris
questionable
landslide debris
51-229 LT
51-229 RT
conc. ret. wall
bio. swale old R.R. box culvert old R.R. box culvert
path
wood fence
UPRR
COUNTY
(STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)
R/W
(STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)
R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W R/W
(COUNTY)
(COUNTY) R/W R/W
(COUNTY) R/W
(COUNTY)
R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY)
(COUNTY) R/W R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) (COUNTY) R/W R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY)
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR)

R/W (UPRR) R/W (UPRR) R/W (UPRR) (UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)

R/W(UPRR) R/W
(UPRR)

R/W(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR) 17 16 18
19 20
21 22
23 24
25 26
27 28 R/W (STATE) R/W (STATE) R/W
(STATE) R/W
(STATE) R/W (STATE) R/W (STATE)
R/W
(STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W
(STATE) R/W (STATE)
R/W
(STATE)
R/W
(STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W (STATE)
R/W
(STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W (STATE)
R/W
(STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W
(STATE) R/W (STATE) R/W (STATE)
R/W
(STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W
(STATE) R/W (STATE)
R/W
(STATE)
R/W
(STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W (STATE)
R/W
(STATE)
R/W
(STATE) R/W (STATE) R/W (STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W (STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W (STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) (STATE)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR)
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR)

R/W(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR)

R/W(UPRR)

R/W(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR)

R/W(UPRR)
R/W
(UPRR)

R/W(UPRR)

R/W(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR)
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)

R/W(UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (UPRR) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) R/W (STATE) (COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
(COUNTY) R/W
R/W
(STATE)
(STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)

R/W (STATE)

R/W (STATE)

R/W (STATE) R/W R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE)
R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE)
(STATE) R/W
R/W
(STATE)
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W
(STATE) R/W

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR

EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR EASE RR

EASE RR

EASE RR EASE RR
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W

R/W R/W R/W R/W R/W R/W
R/W
R/W

R/W R/W

R/W R/W

R/W R/W

R/W R/W R/W R/W R/W R/W R/W

R/W R/W R/W R/W R/W R/W

R/W R/W R/W R/W R/W

R/W R/W R/W R/W R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W

R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W

R/W R/W PACIFIC OCEAN
37+87.95 CONFORM
L4
L5
L6
C3

RINCON COUNTY PARK
10303

72.69' traxbc
10307

73.34' trax
101 SB
101 NB
NB ON-RAMP BATES RD.

SB OFF-RAMP BATES RD.
200
201
202
203
204
205
206
207
700
701
702
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
400
401 109 110 111
112
113
114
115
116
117
118
119
120 121 500
501
502
503
504 100 125150 75100 125 50 75100 65 75 80 85 90 60 60 75 100 80 85
90 95 105 NORTH
0 25' 50' SCALE 1"=50' H CONTOUR GRADING G-02 THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 G-02
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB

CONTOUR GRADING
25 of 119

R/W (UPRR) R/W (UPRR)
30 31
R/W
(STATE) str.lt. hwy sign d.i. oil marker conc. conc. hwy sign 125 150 STATE: DOT-RW83 R 0.4 22 23
24 R/W
(CITY)
R/W
(CITY)

R/W (CITY)
R/W
(CITY)
(CITY) R/W R/W (CITY) R/W (UPRR) R/W (UPRR)
32 33
34 35
36 R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
CITY
COUNTY

CITY COUNTY

CITY COUNTY
R/W
(STATE)
CALTRANS DEDICATES TO CITY str.lt.
down drain str.lt. str.lt. CB (6)wm d.i. d.i. d.i. d.i. d.i. d.i. d.i. hwy sign sign hwy sign oil marker oil marker oil marker oil marker mh bell mh gte gate 4"cyp 4"ironwood 6"cyp 5"cyp 10"pepper36"euc 36"euc 10"cyp 24"euc 2" clump-euc hwy sign hwy signs hwy signs dense dense brush dense brush dense brush dense brush dense brush conc. asph. asph. conc. str.lt. call box hwy sign misc. marker sign foc 150 175 175 200 150175200 175 200 205 210 210 175 200 125 150 175 175 200 150175200 175 200 205 210 210 175 200 125 101 SB
101 SB ON-RAMP
101 SB ON-RAMP

CARPINTERIA
AVENUE STATE: DOT-RW83 R 0.6 APN 001-210-013 APN 001-210-023 101 NB
BEG
BEG
END
BEG
1 2
A
B
C CITY PROPERTY APN 001-210-016 APN 001-220-092 (SOUTHERN PACIFIC TRANSPORTATION CO.) NOTE 2 NOTE 3 CP ACCESS ROAD BENCH EXISTING FENCE 11 12
13 14 15 16
17 18
19 20
21 22
BEG
END
END
BEG LEGEND 6' TALL CHAIN LINK FENCE 8' TALL CHAIN LINK FENCE 4' TALL POLE CRAFT FENCE NORTH MATCHLINE - STA 23+10

SEE NEXT SHEET
0 50' 100' SCALE 1"=50' H FENCE PLAN NOTES 1. THIS PLAN IS FOR FENCING ONLY 2. 12' CHAIN LINK GATE PER CAL TRANS STANDARD PLANS A85 3. 16' CHAIN LINK GATE (TYPE CL-8) PER CAL TRANS STANDARD PLANS A85A THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 F-01
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-fencing plans.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
26 of 119
UPRR
COUNTY
(COUNTY)
R/W
(COUNTY)
R/W
(COUNTY) R/W R/W (UPRR) R/W (UPRR) R/W (UPRR) (UPRR)
R/W
(UPRR)
R/W
(UPRR)
(UPRR)
24 25
26 27
28 29
30 31
R/W
(STATE)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(STATE)
(STATE)
R/W
(STATE)

EASE RR

EASE RR
R/W
R/W
R/W
R/W
R/W
R/W
UPRR
PROPERTY d.i. str.lt. d.i. hwy sign str.lt. hwy sign d.i. down drain
box culvert
rusty 36" CMP
hwy sign d.i. sewer siphon d.i. d.i. /\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\ d.i.
ditch
hwy sign oil marker oil marker concrete sea wall
end of sea wall conc. inlet old phone pipe
rusty 36" CMPmci fiber optic marker rrmarker rr marker
optic marker broken concrete rubble concrete sea wall /\ /\ /\
/\ /\ /\
/\
/\
/\ /\ /\ /\
/\ /\
/\
/\
/\
/\
/\ /\ /\ /\ /\ dense brush dense brush conc. wind sock conc. likely over pipeline conc. conc. conc. rr ballast
rr ballast
rr ballast
rr ballast
down drain
hwysign oil marker hwy sign hwy sign wv
wave
overhead
wave
overhead
51-229 LT
51-229 RT old R.R. box culvert 125 150 175 25 50 75 75 75 100 100 100 25 50 75 75 100 100 125 125 150 150 155 160 160 85 85 90 150 10 10 125 125 150 175 25 50 75 75 75 100 100 100 25 50 75 75 100 100 125 125 150 150 155 160 160 85 85 90 150 10 10 125 BEG
END
BEG
END
END
BEG
END
BEG
END
BEGEND
END
BEG
3 4
5 6
7 8
9 BEG
END
BEG
B
C
D
E APN 001-220-100 APN 001-220-092 (SOUTHERN PACIFIC TRANSPORTATION CO.) APN 001-010-032 APN 001-220-092 (SOUTHERN PACIFIC TRANSPORTATION CO.) STATE: DOT-RW83 R 0.3 NOTE 3 NOTE 2 NOTE 3 CP 1 10 11
21 22
23 24
25 26
27 28
29 30
31 F
F
F
F
MATCHLINE - STA 30+90

SEE NEXT SHEET
MATCHLINE - STA 23+10
SEE PREVIOUS SHEET NOTES SEE NOTES ON F-01 THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 F-02
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-fencing plans.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105

MB NORTH
0 50' 100' SCALE 1"=50' H FENCE PLAN
27 of 119
(COUNTY) R/W
(COUNTY) R/W
(COUNTY)
R/W
(COUNTY) R/W (COUNTY) R/W
(COUNTY) R/W 15 17 16 18
19 20
21 22
R/W
(STATE)
R/W
(STATE)
R/W
(STATE) R/W (STATE)
R/W
R/W
R/W
R/W
R/W R/W mrkr
rusty 36" CMP d.i. gatestr.lt. ditch str.lt. /\
/\
ditch conc. inlet old phone pipe
rusty 36" CMP
conc. retaining wall
failed conc. retaining wall
bridge ruins
asphalt ramp mh mh
4" PVC
conc & rip-rap outfall
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\ /\
/\ /\
/\ /\ /\ dense brush dense brush conc. conc. conc. conc. hwy sign hwy sign hwy signwall ruins
wood ret. wall (failed) mrkr mrkr mrkr mrkr mrkr mrkr
questionable
landslide debris
questionable
landslide debris
conc. ret. wall
bio. swale
sidewalk old R.R. box culvert old R.R. box culvert
path
wood fence 50 75 100 100 125 125 50 75 100 100 125 125 25 50 75 100 100 65 150 5 10
5 10 10 65 65 50 75 100 100 125 125 50 75 100 100 125 125 25 50 75 100 100 65 150 5 10
5 10 10 65 65
END 10
END 11 12 APN 001-220-101 STATE: DOT-RW83 R 0.3 APN 001-220-100 CP 31 32
33 34
35 36
37 MATCHLINE - STA 30+90

SEE PREVIOUS SHEET THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 F-03
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-fencing plans.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105

MB NORTH
0 50' 100' SCALE 1"=50' H FENCE PLAN NOTES SEE NOTES ON F-01 28 of 119

THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 F-04
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-fencing plans.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105

MB NORTH
0 50' 100' SCALE 1"=50' H FENCE PLAN
29 of 119
/\
/\
UPRR
COUNTY
(COUNTY)
R/W
(COUNTY)
R/W
(COUNTY) R/W
(COUNTY)
R/W
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) (UPRR)
R/W
(UPRR)
R/W
(UPRR)
(UPRR)
24 25
26 27
28 29
30 31
R/W
(STATE)
R/W
(STATE)
R/W
(UPRR)
R/W
(UPRR) (UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(STATE)
R/W
(STATE)

EASE RR

EASE RR

EASE RR
R/W
R/W
R/W
R/W
R/W
R/W

UPRR PROPERTY
L2
L10
L11
-0
0 1
2 2
L3 L4 L5 L6
1 1
2 3
21 22
23 24
25 26
27 28
29 30
31 109 110 111 112
113
114
115
116
1 200
201
202
SD
SD
SD
SD
SD
SD
SD
SD
SD
FM
FM
FM
FM
FM
FM
FM
FM
3G
3H
3I
3C
3D
3J
3F
OIL

PIPELINE CONTINUES TO EAST
E
30" RCP 36" RCP
42" RCP 18" CMP
30" CMP
36" TO 30" ELBOW REDUCER
36" CMP
36" CMP
4" HDPE
COM
COM
COM
COM
COM
COM

COMMUNICATIONS CONTINUES

IN RAILROAD CORRIDOR
SD
SD
SD
SD
SD
SD
SD
SD
COM
COM
COM
COM
COM
COM
"FL-01" LINE
"FL-01" LINE
30" x 28' RCP
30" HEADWALL

CONNECT TO
(E) D.I. 3i
GCP DI (H = 12') w/ LADDER
GRATE TYPE 36R

MODIFY (E)
30" RCP SD
12" x 24' CORRUGATED

SMOOTH LINED HDPE
12" x 64' CORRUGATED

SMOOTH LINED HDPE
12" x 72' CORRUGATED

SMOOTH LINED HDPE
12" x 96' CORRUGATED

SMOOTH LINED HDPE
G1 DI (H = 4.3')
GRATE TYPE 24-12X G1 DI (H = 5.3') w/ LADDER
GRATE TYPE 24-12X
GO DI (H = 5.4') w/ LADDER
GRATE TYPE 24-12X
OCP DI (H = 6.2') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
2 TON RSP
24" x 72' CORRUGATED

SMOOTH LINED HDPE
24" CORRUGATED

SMOOTH LINED HDPE
GO DI (H = 4.6')
GRATE TYPE 24-12X
24" x 88' CORRUGATED

SMOOTH LINED HDPE
OCP DI (H = 8') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
2 TON RSP
(e) cmp sd
2 c
a
3 f
g
a
c
d
NOTE
4 TYP. SEA WALL
b
e
5 a
b
c
d
b
1 X
X
h
a
b
125
150
75 100
125
150
125
75 100
125
150
100
125
150
75 25
50 125
150
100
125
25 50
75 125
105
110
115
120
100
105
110
115
120
75 100
75 75
25 50
125
150
NOTES

1. FOR COMPLETE RIGHT OF WAY INFORMATION, SEE MAPS IN THE CITY OFFICES.

2. THESE PLANS ARE APPROVED FOR THE LAYOUT AND CONSTRUCTION OF THE DRAINAGE FACILITIES ONLY.

3. EXISTING DRAINAGE SYSTEMS ARE NAMED ACCORDING TO THE 1968 CALTRANS DRAINAGE PLANS (SEE RECORD DRAWINGS).

4. APPROX. 10-FOOT X 10-FOOT PAD OF 2 TON RIP RAP AT OUTFALL OF DRAINAGE SYSTEMS 3, 5, 6, &7.

MATCHLINE - STA 31+00 SEE NEXT SHEET
SCALE 1"=50' H
DRAINAGE - 01
0 50' 100'
NORTH

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
D-01
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE PLANS 30 of 119
/\ /\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\ /\ /\
/\
/\ /\ /\ /\
/\
(COUNTY)
(COUNTY)
R/W
(COUNTY)
R/W
(COUNTY)
R/W
(COUNTY)

R/W (COUNTY)
R/W
(COUNTY) R/W
15 17
16 18
19 20
21 22
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
R/W
R/W
R/W
R/W

R/W R/W
L10
L11
REMOVE (E) CMP & CONC. HEADWALLS
2 3
-0
0 1
2 2
2 0 1
2 30
31 32
33 34
35 36
37 121+30
115
116
117
118
119
120
121

REMOVE (E) CMP
201
202
203
204
205
206
207
208
L13
L14
L15
L16 L17
L18 L19 L20
L21
FM
FM
FM
FM
SD
COM
COM
COM
COM
"FL-01" LINE
24" x 72' CORRUGATED

SMOOTH LINED HDPE
GO DI (H = 4.6')
GRATE TYPE 24-12X
24" x 88' CORRUGATED

SMOOTH LINED HDPE
" CHECKERED PLATE
2 TON RSP
18" x 106' CORRUGATED

SMOOTH LINED HDPE
18" x 108' CORRUGATED

SMOOTH LINED HDPE
24" x 8' CORRUGATED

SMOOTH LINED HDPE
24" x 52' CORRUGATED

SMOOTH LINED HDPE
24" x 90' CORRUGATED

SMOOTH LINED HDPE
24" x 8' CORRUGATED

SMOOTH LINED HDPE
24" x 38' CORRUGATED

SMOOTH LINED HDPE
24" x 88' CORRUGATED

SMOOTH LINED HDPE
24" x 118' CORRUGATED

SMOOTH LINED HDPE
OCP DI (H = 5') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
GO DI (H = 5.2') w/ LADDER
GRATE TYPE 24-12X
GO DI (H = 5.1') w/ LADDER
GRATE TYPE 24-12X
OCP DI (H = 8') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
2 TON RSP
OCP DI (H = 5.6') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
GO DI (H = 5.1') w/ LADDER
GRATE TYPE 24-12X
GO DI (H = 5.2') w/ LADDER
GRATE TYPE 24-12X
OCP DI (H = 9') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
GO DI (H = 4')
GRATE TYPE 24-12X
2 TON RSP
(e) cmp sd
6 a
a
b
c
e
f
h
c
e
f
d
5 a
b
c
d
d
g
b
g
a
8 7
x
X
x
h
b
125
150
100
125
25 50
75 100
25 50
75 100
25 50
100
80 85
90 95
66 NOTES

1. FOR COMPLETE RIGHT OF WAY INFORMATION, SEE MAPS IN THE CITY OFFICES.

2. THESE PLANS ARE APPROVED FOR THE LAYOUT AND CONSTRUCTION OF THE DRAINAGE FACILITIES ONLY.

3. EXISTING DRAINAGE SYSTEMS ARE NAMED ACCORDING TO THE 1968 CALTRANS DRAINAGE PLANS (SEE RECORD DRAWINGS).

4. APPROX. 10-FOOT X 10-FOOT PAD OF 2 TON RIP RAP AT OUTFALL OF DRAINAGE SYSTEMS 3, 5, 6, &7. MATCHLINE - STA 31+00 SEE PREVIOUS SHEET DRAINAGE - 02

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
D-02
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE PLANS SCALE 1"=50' H
0 50' 100'
NORTH
31 of 119
100
110
120
130
140
100
110
120
130
140
115.4(OG)
119.51(PG)
115.1(OG)
112.22(PG)
(OG)
(PG)
0+75 1+00 1+50
1+22.39
104.67
(E) 42" RCP SD
INV 107.24
(E) 30" RCP SD
INV 107.24 1+24.83 FL 110.27 1+00 FL 112.22
OG
FG
(E) 36" RCP SD
INV 105.47
(E) OIL LINE
(ABANDONED)
S = -34%

CONNECT TO
(E) D.I. 3i
INVERT BASED ON RECORD DRAWINGS.

CHECK GRADES BEFORE CONSTRUCTION
30" x 28' RCP
30" HEADWALL a b c
INV IN
104.67
100
110
120
130
100
110
120
130
114.2(OG)
(PG)
112.3(OG)
(PG)
110.5(OG)
(PG)
(OG)
(PG) 1+00 FL 111.50
FROM (E) D.I. 3D TO (E) D.I. 3G
(E) D.I. 3i
INV 105.47 1+83.73 FL 110.27
FG
OG
FROM (E) D.I. 3J
INV 99.88
OG
PG 24+37
1+00 2+00
(E) OIL LINE
(ABANDONED)

LOCALIZED

DEPRESSION
117.87
"CRT" LINE
(E) 30" RCP SD (E) 42" RCP SD
(E) 36" RCP SD 1
INVERT BASED ON RECORD DRAWINGS.

MATCH EXISTING FL
GCP DI (H = 12') w/ LADDER
GRATE TYPE 36R

MODIFY (E)
30" RCP SD a b
NOTES:

1. THESE PLANS ARE APPROVED FOR THE LAYOUT AND CONSTRUCTION OF THE DRAINAGE FACILITIES ONLY.

2. EXISTING DRAINAGE SYSTEMS ARE NAMED ACCORDING TO THE 1968 CALTRANS DRAINAGE PLANS (SEE RECORD DRAWINGS).

3. SOIL REINFORCEMENT, WHERE IT WILL BE PLACED, IS NOT SHOWN ON THE DRAINAGE PROFILES

4. PIPES IN PROFILE VIEW ARE EXTENDED TO CENTER OF STRUCTURE & LENGTHS OF PIPES ARE ROUNDED UP TO NEAREST 2' FOR MEASUREMENT. PIPES WILL BE TRIMMED PER STANDARD PLANS.

5. PIPE ELBOWS ARE USED WHERE STORM DRAIN CHANGES VERTICAL ANGLE AND ARE INCLUDED IN THE LENGTH.

6. JOINT RESTRAINERS ARE: (SEE CALTRANS STD PLANS FOR DETAIL)

6.1. TYPE A - AT MID-POINT OF PIPE

6.2. TYPE B - AT PIPE JOINT

7. STRUCTURE HEIGHT (H) IS MEASURED FROM TOP OF BOTTOM SLAB TO THE NORMAL GUTTER GRADE LINE UNDEPRESSED AT THE CURB FACE.

8. DEPTH & LOCATION OF COMMUNICATION LINE ON OLD BENCH IS NOT KNOWN. POTHOLE BEFORE PROCEEDING. SEE RIGHT-OF WAY AGREEMENTS IN CITY OFFICES FOR MORE INFORMATION.

DRAINAGE SYSTEM 1 PROFILE
DRAINAGE SYSTEM 2 PROFILE

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2D-03 f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE PLANS SCALE 1"=10' H&V
DRAINAGE - 03 0 10' 20'
32 of 119
10 20
30 40
50 60
70 80
90 100
110
120
130
140
150
10 20
30 40
50 60
70 80
90 100
110
120
130
140
150
114.7(OG)
111.35(PG)

96.7(OG)
101.63(PG)

34.1(OG)
(PG) 1+00 FL 111.35 1+22.80 FL 111.37 2+41.51 FL 69.55 1+01 107.33 2+39.99 65.37 1+24.40 106.35 1+86.35 103.41 1+21.51 106.92 3+21 16.19 1+90.13 103.22 OG
FG 1+83.68 103.80 3+19.21 16.26

JOINT RESTRAINER
ASSEMBLY TYP.

PG 26+15
(E) COM - FRONTIER 1+85.01 FL 108.50
35° 1+91.01 109.27 2+42.99 64.93 2+54.94 64.34
34°
145°'
111.48
S = -4.3%
-5%
S = -5%
S = -75%
"CRT" LINE
S = -2%
S = -76%
"OBSERVATION AREA"
"FL-01" LINE
S = -2%
12" x 64' CORRUGATED

SMOOTH LINED HDPE
12" x 96' CORRUGATED

SMOOTH LINED HDPE
G1 DI (H = 4.3')
GRATE TYPE 24-12X
G1 DI (H = 5.3') w/ LADDER
GRATE TYPE 24-12X
GO DI (H = 5.4') w/ LADDER
GRATE TYPE 24-12X
OCP DI (H = 6.2') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
2 TON RSP
12" x 24' CORRUGATED

SMOOTH LINED HDPE
12" x 72' CORRUGATED

SMOOTH LINED HDPE
a
b
c
d
e
f
g
h
x
0+70 1+00 2+00 3+00 3+50
NOTES:

1. THESE PLANS ARE APPROVED FOR THE LAYOUT AND CONSTRUCTION OF THE DRAINAGE FACILITIES ONLY.

2. EXISTING DRAINAGE SYSTEMS ARE NAMED ACCORDING TO THE 1968 CALTRANS DRAINAGE PLANS (SEE RECORD DRAWINGS).

3. SOIL REINFORCEMENT, WHERE IT WILL BE PLACED, IS NOT SHOWN ON THE DRAINAGE PROFILES

4. PIPES IN PROFILE VIEW ARE EXTENDED TO CENTER OF STRUCTURE & LENGTHS OF PIPES ARE ROUNDED UP TO NEAREST 2' FOR MEASUREMENT. PIPES WILL BE TRIMMED PER STANDARD PLANS.

5. PIPE ELBOWS ARE USED WHERE STORM DRAIN CHANGES VERTICAL ANGLE AND ARE INCLUDED IN THE LENGTH.

6. JOINT RESTRAINERS ARE: (SEE CALTRANS STD PLANS FOR DETAIL)

6.1. TYPE A - AT MID-POINT OF PIPE

6.2. TYPE B - AT PIPE JOINT

7. STRUCTURE HEIGHT (H) IS MEASURED FROM TOP OF BOTTOM SLAB TO THE NORMAL GUTTER GRADE LINE UNDEPRESSED AT THE CURB FACE.

8. DEPTH & LOCATION OF COMMUNICATION LINE ON OLD BENCH IS NOT KNOWN. POTHOLE BEFORE PROCEEDING. SEE RIGHT-OF WAY AGREEMENTS IN CITY OFFICES FOR MORE INFORMATION.

DRAINAGE SYSTEM 3 PROFILE

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
D-04
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE PLANS SCALE 1"=10' H&V
DRAINAGE - 04
0 10' 20'
33 of 119
151.6(OG)
150.75(PG)
105.2(OG)

90.76(PG)

29.3(OG)
(PG)
0+00 1+00 2+00 1+13.94 85.18 1+45.72 59.44 1+60.44 58.80 2+17.74 15.12 0+85.48 85.44 0+85.48 FL 89.84 1+47.24 FL 65.74 OG
FG 2+09.87 15.27
PG 30+68
(E) COM - FRONTIER
38°
40°
140°'

JOINT RESTRAINER
ASSEMBLY TYP.

90.75 S = -2%
S = -81%
S = -2%
S = -87%
"CRT" LINE
S = -2%
"FL-01" LINE
"FL-02"
LINE
GO DI (H = 4.6')
GRATE TYPE 24-12X
OCP DI (H = 8') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
2 TON RSP
24" x 72' CORRUGATED

SMOOTH LINED HDPE
24" x 88' CORRUGATED

SMOOTH LINED HDPE
a
d
c
b
x
NOTES:

1. THESE PLANS ARE APPROVED FOR THE LAYOUT AND CONSTRUCTION OF THE DRAINAGE FACILITIES ONLY.

2. EXISTING DRAINAGE SYSTEMS ARE NAMED ACCORDING TO THE 1968 CALTRANS DRAINAGE PLANS (SEE RECORD DRAWINGS).

3. SOIL REINFORCEMENT, WHERE IT WILL BE PLACED, IS NOT SHOWN ON THE DRAINAGE PROFILES

4. PIPES IN PROFILE VIEW ARE EXTENDED TO CENTER OF STRUCTURE & LENGTHS OF PIPES ARE ROUNDED UP TO NEAREST 2' FOR MEASUREMENT. PIPES WILL BE TRIMMED PER STANDARD PLANS.

5. PIPE ELBOWS ARE USED WHERE STORM DRAIN CHANGES VERTICAL ANGLE AND ARE INCLUDED IN THE LENGTH.

6. JOINT RESTRAINERS ARE: (SEE CALTRANS STD PLANS FOR DETAIL)

6.1. TYPE A - AT MID-POINT OF PIPE

6.2. TYPE B - AT PIPE JOINT

7. STRUCTURE HEIGHT (H) IS MEASURED FROM TOP OF BOTTOM SLAB TO THE NORMAL GUTTER GRADE LINE UNDEPRESSED AT THE CURB FACE.

8. DEPTH & LOCATION OF COMMUNICATION LINE ON OLD BENCH IS NOT KNOWN. POTHOLE BEFORE PROCEEDING. SEE RIGHT-OF WAY AGREEMENTS IN CITY OFFICES FOR MORE INFORMATION.

DRAINAGE SYSTEM 5 PROFILE

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
D-05
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE PLANS SCALE 1"=10' H&V
DRAINAGE - 05
0 10' 20'
34 of 119
0 10
20 30
40 50
60 70
80 90
100
110
120
130
140
150
0 10
20 30
40 50
60 70
80 90
100
110
120
130
140
150
133.6(OG)
132.59(PG)

73.0(OG)

76.68(PG)

21.0(OG)
(PG) 2+36.23 FL 63.41 1+00.89 FL 132.42 1+90.61 FL 75.82 2+19.73 69.68 1+16.30 128.23 1+71.37 73.00 3+11.90 13.73 2+43.78 56.72 1+00.89 129.00 1+83.25 70.64 1+90.61 70.27 2+34.75 57.19 2+37.75 56.90 0+75 1+00 2+00 3+00 3+50
OG
FG 3+01.32 13.94
PG 33+58
(E) COM - FRONTIER
138°
138°
141°
35° 1+81.44 72.50
145° 1+82.61 FL 76.20

JOINT RESTRAINER
ASSEMBLY TYP.

76.71 S = -5%
S = -5%
S = -100%
S = -2%
"CRT" LINE
S = -2%
S = -74%
"FL-02" LINE
"FL-01" LINE
S = -83%
S = -2%
S = -5%
24" x 8' CORRUGATED

SMOOTH LINED HDPE
24" x 90' CORRUGATED

SMOOTH LINED HDPE
18" x 106' CORRUGATED

SMOOTH LINED HDPE
OCP DI (H = 5') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
GO DI (H = 5.2') w/ LADDER
GRATE TYPE 24-12X
OCP DI (H = 8') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
2 TON RSP
GO DI (H = 5.1') w/ LADDER
GRATE TYPE 24-12X
24" x 52' CORRUGATED

SMOOTH LINED HDPE
a
b
c
d
e
f
g
h
x
NOTES:

1. THESE PLANS ARE APPROVED FOR THE LAYOUT AND CONSTRUCTION OF THE DRAINAGE FACILITIES ONLY.

2. EXISTING DRAINAGE SYSTEMS ARE NAMED ACCORDING TO THE 1968 CALTRANS DRAINAGE PLANS (SEE RECORD DRAWINGS).

3. SOIL REINFORCEMENT, WHERE IT WILL BE PLACED, IS NOT SHOWN ON THE DRAINAGE PROFILES

4. PIPES IN PROFILE VIEW ARE EXTENDED TO CENTER OF STRUCTURE & LENGTHS OF PIPES ARE ROUNDED UP TO NEAREST 2' FOR MEASUREMENT. PIPES WILL BE TRIMMED PER STANDARD PLANS.

5. PIPE ELBOWS ARE USED WHERE STORM DRAIN CHANGES VERTICAL ANGLE AND ARE INCLUDED IN THE LENGTH.

6. JOINT RESTRAINERS ARE: (SEE CALTRANS STD PLANS FOR DETAIL)

6.1. TYPE A - AT MID-POINT OF PIPE

6.2. TYPE B - AT PIPE JOINT

7. STRUCTURE HEIGHT (H) IS MEASURED FROM TOP OF BOTTOM SLAB TO THE NORMAL GUTTER GRADE LINE UNDEPRESSED AT THE CURB FACE.

8. DEPTH & LOCATION OF COMMUNICATION LINE ON OLD BENCH IS NOT KNOWN. POTHOLE BEFORE PROCEEDING. SEE RIGHT-OF WAY AGREEMENTS IN CITY OFFICES FOR MORE INFORMATION.

DRAINAGE SYSTEM 6 PROFILE

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
D-06
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE PLANS SCALE 1"=10' H&V
DRAINAGE - 06
0 10' 20'
35 of 119
10 20
30 40
50 60
70 80
90 100
110
120
130
10 20
30 40
50 60
70 80
90 100
110
120
130
(OG)
(PG)

64.4(OG)

64.61(PG)

11.4(OG)
(PG) 1+78.98 FL 63.63 1+87 FL 63.71 0+92.20 106.26 1+15.34 105.10 2+25.53 55.58 2+41.42 54.78 2+94.88 12.10 2+22.56 56.38 1+79.58 58.53 1+86.90 58.17 0+90.73 FL 110.06 2+24.06 FL 63.00 OG
FG
PG 36+71 2+88.66 12.41
(E) COM
FRONTIER 1+60.29 60.21
39°
141°
42°
42°

JOINT RESTRAINER
ASSEMBLY TYP.

64.61 INV IN
S = 5%

56.99 S = -5%
S = -5%
S = -100%
S = -5%
S = -90%
S = -5%
"CRT" LINE
"FL-01" LINE
"FL-02" LINE
-5%
8 OCP DI (H = 5.6') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
18" x 108' CORRUGATED

SMOOTH LINED HDPE
24" x 38' CORRUGATED

SMOOTH LINED HDPE
24" x 88' CORRUGATED

SMOOTH LINED HDPE
2 TON RSP
GO DI (H = 5.1') w/ LADDER
GRATE TYPE 24-12X
GO DI (H = 5.2') w/ LADDER
GRATE TYPE 24-12X
OCP DI (H = 9') w/ LADDER
GRATE TYPE 1
4 " CHECKERED PLATE
24" x 8' CORRUGATED

SMOOTH LINED HDPE
f
g
e
a
b
c
d
h
x
NOTES:

1. THESE PLANS ARE APPROVED FOR THE LAYOUT AND CONSTRUCTION OF THE DRAINAGE FACILITIES ONLY.

2. EXISTING DRAINAGE SYSTEMS ARE NAMED ACCORDING TO THE 1968 CALTRANS DRAINAGE PLANS (SEE RECORD DRAWINGS).

3. SOIL REINFORCEMENT, WHERE IT WILL BE PLACED, IS NOT SHOWN ON THE DRAINAGE PROFILES

4. PIPES IN PROFILE VIEW ARE EXTENDED TO CENTER OF STRUCTURE & LENGTHS OF PIPES ARE ROUNDED UP TO NEAREST 2' FOR MEASUREMENT. PIPES WILL BE TRIMMED PER STANDARD PLANS.

5. PIPE ELBOWS ARE USED WHERE STORM DRAIN CHANGES VERTICAL ANGLE AND ARE INCLUDED IN THE LENGTH.

6. JOINT RESTRAINERS ARE: (SEE CALTRANS STD PLANS FOR DETAIL)

6.1. TYPE A - AT MID-POINT OF PIPE

6.2. TYPE B - AT PIPE JOINT

7. STRUCTURE HEIGHT (H) IS MEASURED FROM TOP OF BOTTOM SLAB TO THE NORMAL GUTTER GRADE LINE UNDEPRESSED AT THE CURB FACE.

8. DEPTH & LOCATION OF COMMUNICATION LINE ON OLD BENCH IS NOT KNOWN. POTHOLE BEFORE PROCEEDING. SEE RIGHT-OF WAY AGREEMENTS IN CITY OFFICES FOR MORE INFORMATION.

DRAINAGE SYSTEM 7 PROFILE

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
D-07
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE PLANS SCALE 1"=10' H&V
DRAINAGE - 07
0 10' 20'
36 of 119
10 20
30 40
50 60
70 80
90 10
20 30
40 50
60 70
80 90

55.1(OG)

63.83(PG)

62.7(OG)

64.64(PG) 2+42.84 FL 64.18 2+41.14 60.43
0+75 1+00 2+00 2+85
OG 1+25 FL 63.00

INV OUT

55.58 1+26.62 56.99
FG
S = -3% 7
24" x 118' CORRUGATED

SMOOTH LINED HDPE
GO DI (H = 4')
GRATE TYPE 24-12X b a
NOTES:

1. THESE PLANS ARE APPROVED FOR THE LAYOUT AND CONSTRUCTION OF THE DRAINAGE FACILITIES ONLY.

2. EXISTING DRAINAGE SYSTEMS ARE NAMED ACCORDING TO THE 1968 CALTRANS DRAINAGE PLANS (SEE RECORD DRAWINGS).

3. SOIL REINFORCEMENT, WHERE IT WILL BE PLACED, IS NOT SHOWN ON THE DRAINAGE PROFILES

4. PIPES IN PROFILE VIEW ARE EXTENDED TO CENTER OF STRUCTURE & LENGTHS OF PIPES ARE ROUNDED UP TO NEAREST 2' FOR MEASUREMENT. PIPES WILL BE TRIMMED PER STANDARD PLANS.

5. PIPE ELBOWS ARE USED WHERE STORM DRAIN CHANGES VERTICAL ANGLE AND ARE INCLUDED IN THE LENGTH.

6. JOINT RESTRAINERS ARE: (SEE CALTRANS STD PLANS FOR DETAIL)

6.1. TYPE A - AT MID-POINT OF PIPE

6.2. TYPE B - AT PIPE JOINT

7. STRUCTURE HEIGHT (H) IS MEASURED FROM TOP OF BOTTOM SLAB TO THE NORMAL GUTTER GRADE LINE UNDEPRESSED AT THE CURB FACE.

8. DEPTH & LOCATION OF COMMUNICATION LINE ON OLD BENCH IS NOT KNOWN. POTHOLE BEFORE PROCEEDING. SEE RIGHT-OF WAY AGREEMENTS IN CITY OFFICES FOR MORE INFORMATION.

DRAINAGE SYSTEM 8 PROFILE

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2D-08 f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE PLANS SCALE 1"=10' H&V
DRAINAGE - 08 0 10' 20'
37 of 119
DRAINAGE SYSTEM 1

SEGMENT
ID
L2

START STATION
1+00.00
START

NORTHING
1964097.82
START

EASTING
6114406.25
LENGTH

22.39'

DIRECTION/
DELTA
S61° 06' 40.08"W

END STATION
1+22.39

END NORTHING
1964087.00

END EASTING
6114386.64
DRAINAGE SYSTEM 3

SEGMENT
ID
L3
L4
L5
L6

START STATION
1+00.00
1+22.80
1+86.61
2+41.51
START

NORTHING
1963900.67
1963910.46
1963867.71
1963830.92
START

EASTING
6114358.40
6114337.81
6114290.45
6114249.70
LENGTH

22.80'

63.81'

54.90'

79.49'

DIRECTION/
DELTA
N64° 33' 17.79"W
S47° 55' 48.31"W
S47° 55' 19.65"W
S47° 55' 32.67"W

END STATION
1+22.80
1+86.61
2+41.51
3+21.00

END NORTHING
1963910.46
1963867.71
1963830.92
1963777.66

END EASTING
6114337.81
6114290.45
6114249.70
6114190.70
DRAINAGE SYSTEM 2

START STATION START

NORTHING
START

EASTING
1+00 1964049.15 6114461.32
DRAINAGE SYSTEM 8

SEGMENT
ID
L21

START STATION
1+25.00
START

NORTHING
1962998.53
START

EASTING
6114867.02
LENGTH
117.84'

DIRECTION/
DELTA
S41° 37' 48.49"E

END STATION
2+42.84

END NORTHING
1962910.45

END EASTING
6114945.30
DRAINAGE SYTEM 6

SEGMENT
ID
L13
L14
L15
L16

START STATION
1+00.89
1+82.61
1+90.61
2+36.23
START

NORTHING
1963330.72
1963290.10
1963283.04
1963260.36
START

EASTING
6114793.58
6114722.67
6114726.45
6114686.88
LENGTH

81.72'

8.00'

45.61'

75.44'

DIRECTION/
DELTA
S60° 11' 37.43"W
S28° 09' 33.87"E
S60° 10' 21.97"W
S60° 12' 09.30"W

END STATION
1+82.61
1+90.61
2+36.23
3+11.67

END NORTHING
1963290.10
1963283.04
1963260.36
1963222.87

END EASTING
6114722.67
6114726.45
6114686.88
6114621.41
DRAINAGE SYSTEM 7

SEGMENT
ID
L17
L18
L19
L20

START STATION
0+90.73
1+79.00
1+87.00
2+24.06
START

NORTHING
1963089.91
1963029.55
1963023.93
1962998.53
START

EASTING
6114952.72
6114888.30
6114894.00
6114867.01
LENGTH

88.27'

8.00'

37.06'

70.64'

DIRECTION/
DELTA
S46° 51' 36.95"W
S45° 23' 07.82"E
S46° 44' 07.18"W
S46° 55' 24.64"W

END STATION
1+79.00
1+87.00
2+24.06
2+94.70

END NORTHING
1963029.55
1963023.93
1962998.53
1962950.28

END EASTING
6114888.30
6114894.00
6114867.01
6114815.41
DRAINAGE SYSTEM 5

SEGMENT
ID
L10
L11

START STATION
0+85.49
1+47.24
START

NORTHING
1963526.74
1963491.72
START

EASTING
6114567.62
6114516.76
LENGTH

61.75'

71.49'

DIRECTION/
DELTA
S55° 26' 47.78"W
S55° 27' 27.65"W

END STATION
1+47.24
2+18.74

END NORTHING
1963491.72
1963451.18

END EASTING
6114516.76
6114457.87

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2D-09 f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE LAYOUT DRAINAGE - 09
38 of 119

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2D-10 f:\pdata\0_active projects\carp rincon trail\production drawings\crt-drainage.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 DRAINAGE QUANTITIES DRAINAGE - 10
39 of 119
STOP
22 23
R35(CA)
101 SB
101 SB ON-RAMP
101 SB ON-RAMP

CARPINTERIA AVENUE
101 NB
"CRT" LINE
ES
3' 5'
HWY 150
STOP R1-1(CA)
ETW

SEE TRAILHEAD DETAIL
NOTE 1
11 12
13 14
15 16
17 18
19 20
21 27b
27b
"TH" LINE 800+64.56 (END) ="CRT" LINE 10+40 (BEG)
NOTE 2
"TH" LINE
"TH" LINE 800+00 (BEG)

BOLLARD
6" SOLID
YELLOW
5'
1'
NOTE 2
R35(CA)
NORTH
0 50' 100'
SCALE 1"=50' H

PAVEMENT
DELINEATIONS - 1
NOTES
A. THIS PLAN IS FOR THE LAYOUT OF SIGNS AND STRIPING ONLY.

1. 6" YELLOW RETROREFLECTIVE DASHED - 3' SEGMENT - 9'GAP (MUTCD FIGURE 9C-2).

2. 6" YELLOW RETROREFLECTIVE SOLID.

3. 36" CHANNELIZER CAL TRANS A73SC. MIN. OF 2' FROM EDGE OF SHOULDER. RETROREFLECTIVE SHEETING ON BOTH SIDES.

4. LOCATIONS OF SIGNS ARE APPROXIMATE AND MAY BE MOVED IN FIELD TO ACCOMMODATE OBSTRUCTION.

5. ALL POST-MOUNTED SIGNS MUST BE PLACED MIN. OF 2' FROM EDGE OF SHOULDER.

LEGEND

BEGIN / END TRAFFIC STRIPE DETAIL

CHANGE OF TRAFFIC STRIPE DETAIL

TRAFFIC STRIPE DETAIL NUMBER

CHANNELIZER
#

TRAIL BEGIN & END PAVEMENT MARKING DETAILS

NOT TO SCALE

PAVEMENT DELINEATION PLAN
SCALE: 1" = 50'
27b
27b

TRAILHEAD DETAIL
SCALE: 1" = 10'
R1-1(CA)

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
PD-1
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-pavement delineations.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 PAVEMENT DELINEATIONS MATCHLINE - STA 23+00 SEE NEXT SHEET
40 of 119
/\ /\
NOTE 1
27b
NOTE 2
NOTE 3
TYP.

NOTE 3
TYP.
22 23
24 25
26 27
28 29
30 31
27b
MATCHLINE - STA 31+00 SEE NEXT SHEET MATCHLINE - STA 23+00 SEE PREVIOUS SHEET 0 50' 100' NORTH SCALE 1"=50' H

PAVEMENT
DELINEATIONS - 2

PAVEMENT DELINEATION PLAN
SCALE: 1" = 50'

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 PD-2
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-pavement delineations.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 PAVEMENT DELINEATIONS NOTES
A. THIS PLAN IS FOR THE LAYOUT OF SIGNS AND STRIPING ONLY.

1. 6" YELLOW RETROREFLECTIVE DASHED - 3' SEGMENT - 9'GAP (MUTCD FIGURE 9C-2).

2. 6" YELLOW RETROREFLECTIVE SOLID.

3. 36" CHANNELIZER CAL TRANS A73SC. MIN. OF 2' FROM EDGE OF SHOULDER. RETROREFLECTIVE SHEETING ON BOTH SIDES.

4. LOCATIONS OF SIGNS ARE APPROXIMATE AND MAY BE MOVED IN FIELD TO ACCOMMODATE OBSTRUCTION.

5. ALL POST-MOUNTED SIGNS MUST BE PLACED MIN. OF 2' FROM EDGE OF SHOULDER.

LEGEND

BEGIN / END TRAFFIC STRIPE DETAIL

CHANGE OF TRAFFIC STRIPE DETAIL

TRAFFIC STRIPE DETAIL NUMBER
CHANNELIZER #
41 of 119
/\ /\
NOTE 1
R35(CA)
31 32
33 34
35 36
37 STOP AHEAD
+20
+57 STOP
+55
+53
+55
27b
27b
R1-1(CA)
27b
MATCHLINE - STA 31+00
SEE PREVIOUS SHEET 0 50' 100'
NORTH SCALE 1"=50' H

PAVEMENT
DELINEATIONS - 3

PAVEMENT DELINEATION PLAN
SCALE: 1" = 50'

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2PD-3 f:\pdata\0_active projects\carp rincon trail\production drawings\carp-pavement delineations.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 PAVEMENT DELINEATIONS NOTES
A. THIS PLAN IS FOR THE LAYOUT OF SIGNS AND STRIPING ONLY.

1. 6" YELLOW RETROREFLECTIVE DASHED - 3' SEGMENT - 9'GAP (MUTCD FIGURE 9C-2).

2. 6" YELLOW RETROREFLECTIVE SOLID.

3. 36" CHANNELIZER CAL TRANS A73SC. MIN. OF 2' FROM EDGE OF SHOULDER. RETROREFLECTIVE SHEETING ON BOTH SIDES.

4. LOCATIONS OF SIGNS ARE APPROXIMATE AND MAY BE MOVED IN FIELD TO ACCOMMODATE OBSTRUCTION.

5. ALL POST-MOUNTED SIGNS MUST BE PLACED MIN. OF 2' FROM EDGE OF SHOULDER.

LEGEND

BEGIN / END TRAFFIC STRIPE DETAIL

CHANGE OF TRAFFIC STRIPE DETAIL

TRAFFIC STRIPE DETAIL NUMBER
CHANNELIZER #
42 of 119

UTILITY CONFLICT PLAN

GENERAL NOTES
GENERAL UTILITY NOTES:

1. 10-INCH OIL PIPELINE (FORMALLY VENOCO--NOW CHEVRON)
- BELIEVED TO BE “ABANDONED”.

LOCATION / ALIGNMENT
· THIS LINE GENERALLY FOLLOWS THE CALTRANS

RIGHT-OF-WAY (OUTSIDE OF STATE RIGHT OF WAY), TRAVELING FROM FWY 150, TOWARD THE “WAVE OVERHEAD” WHERE IT DESCENDS TO THE UPRR, THEN TRAVELS EASTWARD.

DEPTH
· DEPTH OF PIPELINE IS UNKNOWN.

PROJECT WILL
· EXCAVATE NEAR/OVER THIS PIPELINE IN LOCATIONS.
· EXCAVATIONS MAY EXPOSE OR “CUT” THIS LINE.
· DESIGNERS HAVE BEEN TOLD THAT THIS LINE IS “FULL OF WATER” REFERENCE INFORMATION:
· CALTRANS RECORD DRAWINGS FOR CONSTRUCTION ON STATE
HIGHWAY, CONTRACT 07-260704, PROJECT 0700000490, PAGE 205/757 (SHEET U-16).
· VENOCO RECORD DRAWING S2656-A-101 “PAREDON
PROJECT: EXISTING 10-INCH PIPELINE ALIGNMENT”. THIS DRAWING IS PAGE C-23 OF THE “PROPOSED FINAL EIR”.
· BENGAL HAS ATTEMPTED TO FIND MORE DATA, BUT WITH THE

BANKRUPTCY OF VENOCO WE WERE UNABLE TO REACH STAFF FROM BEACON WEST WITH BETTER INFORMATION.

2. 6-INCH WATER PIPELINE: LATERAL 27-R-F: CARPINTERIA VALLEY WATER DISTRICT:
“ABANDONED”.

LOCATION / ALIGNMENT
· THIS LINE ONCE CROSSED HWY 150 FROM CARPINTERIA AVE TO CAMINO CARRETA, EAST OF HWY 150
DEPTH
· UNKNOWN.

PROJECT WILL
· EXCAVATE THROUGH THE LOCATION OF OLD WATERLINE.

REFERENCE INFORMATION:
· CVWD ATLAS MAPS PROVIDED IN APRIL, 2016, NAME THIS
AS “ABANDONED LINE; LATERAL 27-R-F.”
· PIPELINE IS SHOWN AS “ABANDONED” ON THE DRAWINGS FOR THE CONSTRUCTION ON STATE HIGHWAY, CONTRACT 07-260704, PROJECT 0700000490, PAGE 205/757 (SHEET U-16).

3. 4-INCH PRESSURE SEWER: CARPINTERIA SANITARY
DISTRICT (CSD) “SEPTIC TO SEWER
CONVERSION PROJECT”

LOCATION / ALIGNMENT
· THIS LINE CONNECTS A GRAVITY SEWER, DRAINING WEST FROM THE INTERSECTION OF HWY 150/CARPINTERIA AVE., WITH A PRESSURE SEWER LINE FROM A PUMPING PLANT IN RINCON COUNTY PARK. THE

LINE GENERALLY FOLLOWS THE SOUTHBOUND SIDE OF THE FREEWAY, AND I LOCATED ABOUT 5-FEET BEHIND THE DIKE / EDGE OF
SHOULDER.

DEPTH
· THE PIPELINE IS SHOWN TO GENERALLY BE ABOUT 8-FEET
DEEP, EXCEPT AT “WAVE OVERHEAD”, WHERE IT BECOMES
SHALLOWER TO CROSS UPRR. RECORD DRAWINGS SHOW AS-BUILT
DEPTHS WHICH VARY GREATLY.

PROJECT WILL
· CROSS THIS PIPELINE IN VARIOUS LOCATIONS.

REFERENCE INFORMATION
· PIPELINE IS SHOWN ON CSD
DRAWINGS 15-1-5 THROUGH 15-1-7: DESIGNED BY PENFIELD AND SMITH FOR THE “SEPTIC TO SEWER CONVERSION PROJECT”.

4. FRONTIER COMMUNICATION LINE (ON OLD RAILROAD BENCH--LEADING

TO RINCON PARK)

LOCATION / ALIGNMENT
· BECAUSE OF THE LIMITED DATA PROVIDED ON THE ATLAS DRAWINGS WE ARE UNSURE OF THE LOCATION OF THIS LINE.
· ACCORDING TO THE ATLAS MAPS, A FRONTIER FACILITY
NAMED “CRPRCAXF” LINE FOLLOWS THE AT&T LINE FROM CARPINTERIA

AVE, CROSS COUNTRY TO THE UPRR, WHERE IT FOLLOWS THE ACTIVE UPRR CORRIDOR TO THE EAST.
· BUT IN JANUARY, 2019 FRONTIER MARKED A FIBER OPTIC LINE ON THE OLD

RAILROAD BENCH, LEADING TO RINCON COUNTY PARK, WE COULD SEE BOTH

THE CONDUIT AND THE MANHOLES ALONG THE OLD BENCH, BUT WE ARE

UNSURE IF THE EXISTING FRONTIER FACILITY WHICH TRAVELS WESTWARD FROM RINCON PARK IS THE SAME LINE AS “CRPRCAXF” SHOWN ON THE ATLAS MAPS.

DEPTH
· ALONG THE OLD RAILROAD BENCH, THE LINE IS VISIBLE AT SOME LOCATIONS:

AT THESE LOCATIONS IT APPEARS TO BE ABOUT 4-FEET DEEP.

PROJECT WILL:
· CONSTRUCT EMBANKMENTS ON TOP OF IT.
· CONSTRUCT NUMEROUS STORM DRAINS UNDER THIS LINE.
· CONSTRUCT A SOIL RETAINING STRUCTURE BELOW IT AT ABOUT STATION 31+00.
· CONSTRUCT A SLOPE BELOW IT AT ABOUT STATION 36+50.

DESIGNERS NOTE:
· THE LANDMASS AROUND THIS EXISTING FACILITY IS FAILING IN SOME LOCATIONS. THIS IS THE REASON DESIGNERS PROPOSE TO BUILD THE RETAINING WALLS AND SLOPE REPAIRS TO SUPPORT THE RINCON TRAIL. THIS

SLOPE INSTABILITY IS LIKELY ONE REASON THE RAILROAD WAS MOVED IN THE 1960'S.
· THE OLD “WOOD SUPPORT STRUCTURE” WHICH WAS BUILT TO SUPPORT THIS FACILITY APPEARS TO BE FAILING AT ABOUT STATION 31+00.
· THE CONDUIT IS VISIBLE IN SOME LOCATIONS BECAUSE THE LANDMASS BELOW IT HAS SLID AWAY.
· AFTER THE RINCON TRAIL IS CONSTRUCTED, ACCESS TO THIS FACILITY WILL BE MORE DIFFICULT.
· PERHAPS FRONTIER WOULD LIKE TO RELOCATE A PORTION OF THIS LINE TO FOLLOW THE RINCON TRAIL.

REFERENCE INFORMATION
· “FRONTIER UG UTILITY ATLAS MAP” (NOT MUCH DETAIL SHOWN) PROVIDED TO BENGAL IN 2017 & 2019.

5. AT&T / PACIFIC BELL: IN UPRR CORRIDOR

LOCATION / ALIGNMENT
· THIS LINE CONNECTS CROSS-COUNTRY FROM A POINT ON CARPINTERIA AVE, EAST OF HWY 150, ACROSS PRIVATE PROPERTY AND THEN DOWN THE

CUT SLOPE TO THE RAILROAD CORRIDOR WHERE THIS LINE THEN FOLLOWS THE RAILROAD TRACKS ON THE “FREEWAY SIDE” TO THE EAST.

DEPTH
· UNKNOWN.

PROJECT WILL:
· HAVE NO EFFECT ON THIS FACILITY. EARTHWORK AND BRIDGE WORK WILL MUCH HIGHER ON SLOPE. NO CONSTRUCTION TRAFFIC WILL CROSS THIS LINE.

REFERENCE INFORMATION
· AT&T RECORD DRAWINGS WT 129DN0687 AND 689.

6. MCI & SPRINT FIBER SYSTEMS: IN UPRR CORRIDOR

LOCATION / ALIGNMENT
· THIS LINE FOLLOWS THE RAILROAD TRACKS ON THE “OCEAN SIDE”.

DEPTH
· UNKNOWN.

PROJECT WILL:
· HAVE NO EFFECT ON THIS FACILITY. EARTHWORK AND BRIDGE WORK WILL MUCH HIGHER ON SLOPE. NO CONSTRUCTION TRAFFIC WILL CROSS THIS LINE.

REFERENCE INFORMATION
· THESE LINES ARE SHOWN ON THE 2010 DRAWINGS FOR THE CONSTRUCTION ON STATE HIGHWAY, CONTRACT 07-260704, PROJECT 0700000490, PAGE 205/757 (SHEET U-16). LINES ARE SHOWN NEAR THE WAVE OVERHEAD. THE

LOCATIONS SHOWN ARE APPROXIMATE MATCHES TO THE FIELD MARKERS WE LOCATED FURTHER WEST.
· IN 2017 SPRINT PROVIDED A SKETCH.
· 2019 SPRINT RECORD DRAWING NTWRK416 EXCERPT FROM FIBER OPTIC

ROUTE RECORD DRAWING

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
UCNOTES
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-utility mapping.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 UTILITY CONFLICT PLANS 43 of 119
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
UPRR
R/W
(UPRR) R/W
(UPRR)
30 31
32 R/W
(UPRR)
R/W
(UPRR)
R/W
(STATE)

EASE RR
UPRR

PROPERTY SD
22 23
24 SD
SD
SD
SD
SD
SD
SD
SD
SD
FM
FM
3G
3H
3I
3J
3F
OIL
E
E 36" RCP
36" RCP
42" RCP
18" CMP
30" CMP
36" TO 30" ELBOW REDUCER
36" CMP
36" CMP
4" HDPE
COM
SD
SD
SD
COM
COM
COM
COM
30 31
32 UPRR

SEE NOTES REGARDING SEWER
100
120
130
160
110 120
100
90 80
90 120
80 90 100
110
120 130
140
150
150
CB (6)wm
h20 valve nut
h2o mark
h20 valve nut
R/W
(CITY)

R/W (CITY)

R/W (CITY)
R/W
(CITY) (CITY) R/W
R/W
(CITY)
(STATE) R/W
R/W
(UPRR)
33 34
35 R/W
(STATE)
R/W
(STATE) R/W
(STATE)

R/W(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
R/W
(CITY)
(CITY)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)

CITY COUNTY

CITY COUNTY

CITY COUNTY

CITY COUNTY
R/W
(STATE)

CALTRANS DEDICATES TO CITY
UPRR

PROPERTY
101 SB
101 SB ON-RAMP
101 NB
AVENUE

CARPINTERIA
SD
11 12
13 14
15 16
17 18
19 20
21 SD
SD
SD
SD
SD
SD
SD
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
3k
3P
3N
3O
3S
OIL
OIL
OIL
OIL
OIL
COM
W
W
ABANDONED 6"
36" RCP

ELBOW REDUCER
30" RCP
18" RCP
18" RCP
4" HDPE
W
W
W
W
W
COM
COM
COM
COM

OIL PIPELINE ABANDONED
COM
COM
COM
SD
4" HDPE
COM
COM
COM
COM
COM
COM
COM
COM
33 34
35 2
3 UNDERGROUND IRRIGATION SYSTEM
LOCATION UNKNOWN. DOES NOT APPEAR

TO BE WITHIN PROJECT FOOTPRINT

CAL TRANS LIGHTING

REMAINDER OF COM LINE WAS NOT
MARKED IN THE FIELD OWNER UNKNOWN.

DOES NOT APPEAR TO BE WITHIN

PROJECT FOOTPRINT
1 5
6 UPRR
150
100
150
200
200
190
190
150
180
170
160
150
140
130
200
200
160 170
180
140
200
SD SD
APWA
Utility Color Code
Blue = Potable Water Lines
NOTES
A. THIS PLAN SHOWS THE APPROXIMATE LOCATION OF EXISTING UTILITIES WITHIN THE FOOTPRINT OF THE PROJECT ONLY.

B. THE UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND OBSERVATIONS IN THE FIELD FROM 2016 - 2019.

C. CONTRACTOR SHALL COORDINATE WITH ALL UTILITIES PER SPECIAL PROVISIONS.

D. SEE SPECIAL PROVISIONS FOR CONTRACT TIME ALLOWANCES FOR UTILITY WORK PREFORMED BY OTHERS.

E. CONTRACTOR TO COORDINATE WITH UTILITY COMPANIES TO PROVIDE ACCESS FOR RELOCATED UTILITY LINES.

F. EXISTING DRAINAGE SYSTEMS ARE GIVEN IDENTIFICATION FROM CAL TRANS 1968 DRAINAGE PLANS G. CARPINTERIA SANITARY DISTRICT TO BE NOTIFIED WHEN EXCAVATION ACTIVITIES ARE OCCURRING BETWEEN STATION 21+00 - 24+00. PH: (805) 684-7214.

Green = Sewer Lines
Purple = Reclaimed
Water Lines
Red = Electric
Yellow = Gas-Oil-Steam
Orange = LEGEND Communication and TV

PROPOSED DRAINAGE SYSTEM
PROJECT IMPACTED UTILITIES:

1. 10" OIL PIPELINE - CHEVRON - ABANDONED

2. 6" WATER PIPELINE - CVWD - ABANDONED

3. 4" HDPE SEWER FORCE MAIN - CSD

4. COMMUNICATION LINE - FRONTIER
UTILITIES UNDER BRIDGE NOT AFFECTED:

5. COMMUNICATION LINE - AT&T / PAC BELL

6. COMMUNICATION LINE - SPRINT

7. COMMUNICATION LINE - MCI
NORTHMATCHLINE - STA 23+10 SEE NEXT SHEET
0 50' 100'
SCALE 1"=50' H
UTILITY CONFLICT PLAN - 1
AT&T
MCI

FRONTIER
AT&T

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
UC-1
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-utility mapping.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 UTILITY CONFLICT PLANS SPRINT
44 of 119
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
/\
UPRR
COUNTY
(COUNTY)
R/W
(COUNTY)
R/W
(COUNTY) R/W
(COUNTY)
R/W
R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) R/W
(UPRR) (UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
24 25
26 27
28 29
30 31
32 R/W
(STATE)
R/W
(STATE)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR) (UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(STATE)
(STATE) R/W (STATE)
R/W
(STATE)
R/W
(STATE)

EASE RR

EASE RR

EASE RR
R/W
R/W
R/W
R/W
R/W
R/W

CALTRANS DEDICATES TO CITY

UPRR PROPERTY
101 SB
SD SD
101 SB
101 NB

PACIFIC OCEAN SD SD SDSD SD
19 20
21 22
23 24
25 26
27 28
29 30
31 32
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
FM
FM
FM
FM
FM
FM
FM
FM
FM
3G
3H
3I
3C
3D
3J
3F
OIL
OIL

PIPELINE CONTINUES TO EAST
E
30" RCP 36" RCP
42" RCP 18" CMP
30" CMP
36" TO 30" ELBOW REDUCER
36" CMP
36" CMP
4" HDPE
COM
COM
COM
COM
COM
COM
COM

COMMUNICATIONS CONTINUES

IN RAILROAD CORRIDOR
SD
SD
SD
SD
SD
SD
SD
SD
COM
COM
COM
COM
COM
COM
COM
COM
24 25
26 27
28 29
30 31
32 3
1 4
5 6
UPRR

SEE NOTES REGARDING SEWER
100
150
200
100
130
120
140
130
160
130
110 120
100
90 80
90 20
30 40
60 30
50 40
50 60
70 120
110 100 90
160
130
130
120
110
100
90 70
80 90 100 110
120 130 140 150
100
140
130
120
110
80 90
100
150
SD SD
APWA
Utility Color Code
Blue = Potable Water Lines
NOTES
A. THIS PLAN SHOWS THE APPROXIMATE LOCATION OF EXISTING UTILITIES WITHIN THE FOOTPRINT OF THE PROJECT ONLY.

B. THE UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND OBSERVATIONS IN THE FIELD FROM 2016 - 2019.

C. CONTRACTOR SHALL COORDINATE WITH ALL UTILITIES PER SPECIAL PROVISIONS.

D. SEE SPECIAL PROVISIONS FOR CONTRACT TIME ALLOWANCES FOR UTILITY WORK PREFORMED BY OTHERS.

E. CONTRACTOR TO COORDINATE WITH UTILITY COMPANIES TO PROVIDE ACCESS FOR RELOCATED UTILITY LINES.

F. EXISTING DRAINAGE SYSTEMS ARE GIVEN IDENTIFICATION FROM CAL TRANS 1968 DRAINAGE PLANS G. CARPINTERIA SANITARY DISTRICT TO BE NOTIFIED WHEN EXCAVATION ACTIVITIES ARE OCCURRING BETWEEN STATION 21+00 - 24+00. PH: (805) 684-7214.

Green = Sewer Lines
Purple = Reclaimed
Water Lines
Red = Electric
Yellow = Gas-Oil-Steam
Orange = LEGEND Communication and TV

PROPOSED DRAINAGE SYSTEM
PROJECT IMPACTED UTILITIES:

1. 10" OIL PIPELINE - CHEVRON - ABANDONED

2. 6" WATER PIPELINE - CVWD - ABANDONED

3. 4" HDPE SEWER FORCE MAIN - CSD

4. COMMUNICATION LINE - FRONTIER
UTILITIES UNDER BRIDGE NOT AFFECTED:

5. COMMUNICATION LINE - AT&T / PAC BELL

6. COMMUNICATION LINE - SPRINT

7. COMMUNICATION LINE - MCI MATCHLINE - STA 31+50 SEE NEXT SHEET MATCHLINE - STA 23+10 SEE PREVIOUS SHEET SCALE 1"=50' H
0 50' 100'
NORTH
UTILITY CONFLICT PLAN - 2
AT&T

MCI & SPRINT

FRONTIER

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
UC-2
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-utility mapping.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 UTILITY CONFLICT PLANS 45 of 119
/\ /\
(COUNTY)
(COUNTY)
R/W
(COUNTY)
R/W
(COUNTY)
R/W
(COUNTY)

R/W (COUNTY)
R/W
(COUNTY) R/W
15 17
16 18
19 20
21 22
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
(STATE)
R/W
R/W
R/W
R/W

R/W R/W
SD SD

PACIFIC OCEAN SD SD
SD
SD

SD SD SD
31 32
33 34
35 36
37 101 SB
101 NB

CALTRANS LIGHTING CONDUIT NOT SHOWN
RAMP
FM
FM
FM
FM
SD
COM
COM
COM
COM
SD
SD
15 17
16 18
19 20
21 22
20 4
30 40
60 50 90
20 30
40 80 70
70 80
110
20 30
40 50
60 100
90 80
140
130
120
110
10 130
80 80
90 100
SD SD
APWA
Utility Color Code
Blue = Potable Water Lines
NOTES
A. THIS PLAN SHOWS THE APPROXIMATE LOCATION OF EXISTING UTILITIES WITHIN THE FOOTPRINT OF THE PROJECT ONLY.

B. THE UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND OBSERVATIONS IN THE FIELD FROM 2016 - 2019.

C. CONTRACTOR SHALL COORDINATE WITH ALL UTILITIES PER SPECIAL PROVISIONS.

D. SEE SPECIAL PROVISIONS FOR CONTRACT TIME ALLOWANCES FOR UTILITY WORK PREFORMED BY OTHERS.

E. CONTRACTOR TO COORDINATE WITH UTILITY COMPANIES TO PROVIDE ACCESS FOR RELOCATED UTILITY LINES.

F. EXISTING DRAINAGE SYSTEMS ARE GIVEN IDENTIFICATION FROM CAL TRANS 1968 DRAINAGE PLANS G. CARPINTERIA SANITARY DISTRICT TO BE NOTIFIED WHEN EXCAVATION ACTIVITIES ARE OCCURRING BETWEEN STATION 21+00 - 24+00. PH: (805) 684-7214.

Green = Sewer Lines
Purple = Reclaimed
Water Lines
Red = Electric
Yellow = Gas-Oil-Steam
Orange = LEGEND Communication and TV

PROPOSED DRAINAGE SYSTEM
PROJECT IMPACTED UTILITIES:

1. 10" OIL PIPELINE - CHEVRON - ABANDONED

2. 6" WATER PIPELINE - CVWD - ABANDONED

3. 4" HDPE SEWER FORCE MAIN - CSD

4. COMMUNICATION LINE - FRONTIER
UTILITIES UNDER BRIDGE NOT AFFECTED:

5. COMMUNICATION LINE - AT&T / PAC BELL

6. COMMUNICATION LINE - SPRINT

7. COMMUNICATION LINE - MCI MATCHLINE - STA 31+50 SEE PREVIOUS SHEET SCALE 1"=50' H
0 50' 100'
NORTH
UTILITY CONFLICT PLAN - 3

FRONTIER

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
UC-3
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-utility mapping.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 UTILITY CONFLICT PLANS 46 of 119
PAVEMENT JOINT DETAILS - 1
Contractor's Concrete Placement Plan
The Contractor shall submit a concrete placement plans for approval by the the Engineer at least 14 Calendar days before each proposed pour. Work may not proceed until this plan is approved.

The key components of the include description/provisions/sequencing for each of the following:
· Construction of two components of the cross section: the (generally) 16-foot-wide trail, and (generally) 6.5-foot-wide concrete ditch.

Note the ditch concrete is tinted--the trail is "grey". · Proposed cure time to accommodated construction of these 2 components · Method for concrete formwork / slip forming
· Placement of square dowel bars in baskets (for transverse joints) and plate dowels (for longitudinal joints) · Method for Concrete placement
· Saw cutting of the control joints
· Application of curing compound
· Provisions to protect concrete already in place from damage/cracking from subsequent loaded concrete trucks · Approach to replace portions of concrete which may be accidentally damaged, so that the replaced concrete closely matches the texture, joints, finish and color of the adjacent "original" concrete which was not damage.

Engineer's Notes to the Contractor
· The Contractor's attention is directed to note the narrow work access which will be available from the "based subgrade" during placement of the concrete trail / ditches.
· Because of the limited thickness of the concrete pavement, loaded concrete trucks shall not drive over previously placed concrete.

If the Contractor can provide appropriate measures to protect the previously-placed concrete from damage from UNLOADED trucks, such may be included in the concrete placement plan for consideration by the Engineer · The Engineer envisions that these narrow corridors, which exist on a sloping profile, will affect the maneuverability / access of concrete trucks on the "based subgrade".
· Along the 101 Freeway / Carpinteria Ave. segment, The Contractor may wish to consider using boom pumps for some portions of the trail.
· On the "Ocean side" of the railroad, Note that access for concrete deliveries is isolated; no parallel roads exists. · At the time of the design, Engineers envisioned the paving could be constructed either by slip-forming of by fixed forms; either method is acceptable.
· Engineer's envisioned that slip-forming would be the preferred method for paving. · The contractor may wish to pour alternating components of the trail: perhaps alternating "the trail", then "the ditch", paving. Such is acceptable, providing the Contractor maintains a uniform finish and grade .

Ditch Plate Dowels
The longitudinal joint between the edge of pavement and the ditch are reinforced with Diamond-Shaped Plate Dowels similar to PNA-Brand Diamond Dowels, as approved by the Engineer .

These shall have the following properties:
· 4.5 inch x4.5 inch x 1
4 inches-thick
· Hot-dipped galvanized or epoxy coated
· Spaced to match sawcuts as shown
Square Dowels supported by "Baskets"
The transverse joints are reinforced with dowels are similar to PNA-Brand Square Dowel Basket, shown on Drawing SDB-1 · 1/2 -inch square x 9-inches long
· Hot-dipped galvanized or epoxy coated
· Spaced to match sawcuts as shown
· Note some baskets on the ocean side of bridge are "long" to accommodate the wider pavement here. · Note some baskets at the east end where the trail forks are "short". Both sides of the fork are considered in one length of basket.

Concrete Mix / Finish
The concrete mix specifications and color are defined in the special provisions Saw Cutting
· Placed at the spacing shown on the plans
· Completed within 4 hours of concrete placement
· Cut 2-inches deep
Concrete shall be treated with curing compound or cure-control measures (tarps, rugs, visqueen) as defined in the special provisions. Curing compounds shall be appropriate for "colored concrete" when used on the such surfaces.

Second Concrete Pour--path wear surface
Concrete placement for the wear surface shall start "at the bridge" and proceed away from bridge toward either trailhead The concrete pour for the "trail" shall not occur sooner than 7 calendar days after the ditch pour No concrete trucks shall drive on the previously-constructed ditch.

Prior to concrete placement Contractor shall place sturdy survey reference stakes along the trail to allow dowel basket to be quickly and accurately placed at the intervals shown. These stakes also identify the center of the basket to the sawcutting personal so they may accurately sawcut the joint after the basket is covered with concrete. the sliding Square dowels are Similar to PNA-Brand Square Dowels, as approved by the Engineer, and shall have the following properties:
· Dowels measure 1
2 x 1
2 inch x 18-inches long.
· Dowels are hot-dipped galvanized
· Dowels are inside dowel clips supported by baskets.
· Vertical placement of dowels: dowels are place inn the middle--mid-height of the slab · Are spaced along the basket at 24-inch on centers (Transverse to the centerline of the trail) Sawcuts shall be completed within 4 hours of concrete placement.

Sawcuts are 2-inches deep.

Contractor shall have spare concrete sawing equipment on stand-by during cutting procedures.

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
PJD 1
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-pavement joint details.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 PAVEMENT JOINT DETAILS 47 of 119
On curves, the Joint spacing is 12-feet
as meaured from the Outside (largest
radius) of path
For paved ditches on curves, Note primary control joints are be radial projection of 12-foot spacing from the outside of the curve
Note secondary control joints are placed at midpoint between primary control joints Place Four Plate Dowels, spaced equally; outer plate dowels for each group of 4 are set 1.5 feet inside the primary control joints.

PRIMARY CONTROL JOINT (BASKET & SAWCUT)

SECONDARY CONTROL JOINT(SAWCUT ONLY)
HP
ES
CL
ES

FL DITCH
12'-0" BC
EC
12'-0"
Place an extra joint at the BC/EC
so that the joints on tangents do
not exceed 12 - feet on center
TYP.

TYP.
1' EDGE OFFSET, TYP.
12' TYP.

TINTED "DITCH CONCRETE"

PAVEMENT JOINT PLAN TYPICAL
NTS

DETAIL A

DETAIL B

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
PJD 2
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-pavement joint details.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 PAVEMENT JOINT DETAILS - 2 PAVEMENT JOINT DETAILS
NOTES

SEE TYPICAL SECTIONS NOTES FOR PAVEMENT THICKNESS
48 of 119

PAVEMENT JOINT DETAILS

DETAIL A DETAIL B

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2PJD 3 f:\pdata\0_active projects\carp rincon trail\production drawings\carp-pavement joint details.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 PAVEMENT JOINT DETAILS - 3 PAVEMENT JOINT DETAILS
49 of 119
CB(6)wm /\
h20 valve nut
h2o mark
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\
/\
/\ /\ /\ /\ /\
/\
h20 valve nut
101 SB ON-RAMP
101 SB

PACIFIC OCEAN

CARPINTERIA
AVENUE

ACCESS ROAD BENCH

INCLUDED
HWY 150
200
190
80100 120 140 160 180 200
20 40 60
140
120 100 80 70
80 100
90 100
110
120
130
140
150
170
180
140
150
130150 170 190210 230 250
90 110
120
100
11 12
13 14 15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 101 NB
NORTH 0 100' 200'
SCALE 1"=100'

BONDED FIBER MATRIX

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 Q-1
f:\pdata\0_active projects\carp rincon trail\production drawings\crt - quantities 2.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 NOTES

1. THESE PLANS ARE FOR BONDED FIBER MATRIX QUANTITIES ONLY

2. DOWNDRAIN AREAS ARE NOT SHOWN ALLOWANCE FOR .5AC AT THE DOWNDRAINS

ARE INCLUDED IN BONDED FIBER MATRIX AREA
LEGEND

BONDED FIBER MATRIX AREA
TOTAL: APPROX. 9 ACRES
QUANTITIES - 1 QUANTITIES
50 of 119
CB(6)wm /\
h20 valve nut
h2o mark
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\
/\
/\ /\ /\ /\ /\
/\
h20 valve nut
101 SB ON-RAMP
101 SB

PACIFIC OCEAN

CARPINTERIA
AVENUE
HWY 150
200
190
80100 120 140 160 180 200
20 40 60
140
120 100 80 70
80 100
90 100
110
120
130
140
150
170
180
140
150
130150 170 190210 230 250
90 110
120
100
11 12
13 14 15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 101 NB
NORTH 0 100' 200'
SCALE 1"=100'

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 Q-2
f:\pdata\0_active projects\carp rincon trail\production drawings\crt - quantities 2.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 NOTES

1. THESE PLANS SHOW APPROXIMATE LIMITS OF CLEARING AND GRUBBING.

2. CONTRACTOR TO MAKE THEIR OWN ESTIMATE AND BID ACCORDINGLY.

LEGEND

CLEARING & GRUBBING
TOTAL: APPROX. 10.5 ACRES

PLAN VIEW AREA

CLEARING & GRUBBING
QUANTITIES - 2 QUANTITIES
51 of 119
CB(6)wm /\
h20 valve nut
h2o mark
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\
/\
/\ /\ /\ /\ /\
/\
h20 valve nut
101 SB ON-RAMP
101 SB

PACIFIC OCEAN

CARPINTERIA
AVENUE
HWY 150
200
190
80100 120 140 160 180 200
20 40 60
140
120 100 80 70
80 100
90 100
110
120
130
140
150
170
180
140
150
130150 170 190210 230 250
90 110
120
100
11 12
13 14 15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 101 NB
NORTH 0 100' 200'
SCALE 1"=100'

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 Q-3
f:\pdata\0_active projects\carp rincon trail\production drawings\crt - quantities 2.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 NOTES

1. THESE PLANS ARE FOR EROSION CONTROL QUANTITIES ONLY
LEGEND

ROLLED EROSION CONTROL
TOTAL: APPROX. 76,500 SF

SLOPE SURFACE AREA

EROSION CONTROL
QUANTITIES - 3 QUANTITIES
52 of 119
22 23
h20 valve nut
h2o mark
h20 valve nut
101 SB
101 SB ON-RAMP CARPINTERIA
AVENUE
101 NB
11 12
13 14
15 16
17 18
19 20
21 A1 B1
C2
D1
A6
A0 B0
C1
A7 B4
NORTH MATCHLINE - STA 23+00 SEE NEXT SHEET 0 50' 100'
SCALE 1"=50' H
QUANTITIES - 4

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 Q-4
f:\pdata\0_active projects\carp rincon trail\production drawings\crt - quantities.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 QUANTITIES NOTES

1. THESE PLANS ARE FOR QUANTITIES ONLY

2. CIRCLED TEXT CORRESPONDS TO SUMMARY TABLE

ON LAST QUANTITIES SHEET
LEGEND

SOIL CEMENT

TOP SOIL
BASE

SLURRY SEAL

DITCH CONCRETE

HMA PAVING

TRAIL CONCRETE
CURB
GRAVEL
53 of 119
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
/\ /\
/\ /\
/\
/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
"FL - 01" LINE
HWY 101
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 A1 B1
C3
A2 B2
D2
C4
G1
A2 B2
D2
C6 F1
F2
A3 B3
F3
F4
F4
D3
D4
F6
D5
A2
C5 MATCHLINE - STA 23+00 SEE PREVIOUS SHEET 0 50' 100'
SCALE 1"=50' H
QUANTITIES - 5
NORTH

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 Q-5
f:\pdata\0_active projects\carp rincon trail\production drawings\crt - quantities.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 QUANTITIES LEGEND

SOIL CEMENT

TOP SOIL
BASE

SLURRY SEAL

DITCH CONCRETE

HMA PAVING

TRAIL CONCRETE
CURB

GRAVEL MATCHLINE SEE NEXT SHEET
54 of 119

BATES ROAD

RINCON PARK (SANTA BARBARA COUNTY)
HWY 101 SB OFF RAMP
A4 A5
A5 B4 0 50' 100'
SCALE 1"=50' H
QUANTITIES - 6
NORTH

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 Q-6
f:\pdata\0_active projects\carp rincon trail\production drawings\crt - quantities.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 QUANTITIES LEGEND

SOIL CEMENT

TOP SOIL
BASE

SLURRY SEAL

DITCH CONCRETE

HMA PAVING

TRAIL CONCRETE
CURB

GRAVEL MATCHLINE SEE PREVIOUS SHEET
55 of 119
QUANTITIES - 7

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 Q-7
f:\pdata\0_active projects\carp rincon trail\production drawings\crt - quantities.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 SUMMARY OF QUANTITIES 56 of 119
70 80
90 100
110
120
130 113.6(OG)
118.51(PG)

73.0(OG)
115.61(PG)
104.3(OG)
112.02(PG)
125.6(OG)
110.94(PG)
24+20 25+00 26+00 26+30 24+48 117.48 26+08 111.73
160'-0"
OG

PERMANENT LOW STEEL
(BOTTOM) OF BRIDGE
PG

UNION PACIFIC

RAILROAD

BRIDGE TRUSS & FENCE

NOT SHOWN
-3.59%
℄ OF TRACK
TOP OF RAIL ELEV.= 72.3'

CLEAR ZONE CLEAR ZONE
REQUIRED TEMP. VERT.

CONST. CLEARANCE
MIN. REQUIRED VERT. CLEARANCE 21.5

25.0 25.0 23.3

CAL TRANS

DRAINAGE EASEMENT

UPRR R/W
1:1

1.5:1 BB EB
PILE
PILE 38.35

LOWEST CLEARANCE FROM SOUTH
(OCEAN SIDE) RAIL TO LOWEST STEEL = 38.35' 37.54

LOWEST CLEARANCE FROM

TOP OF RAIL TO
LOWEST STEEL AT 25-FOOT
CLEAR ZONE = 37.54'
OG
FG
FG

TOP CHORD

DIAGONAL

BRACE DIAGONAL FLOOR BEAM

PICKETS

WATER-TIGHT TOE PLATE
HAND
RAIL
CONC.

DECK

STRINGER
BOTTOM
CHORD 10'
PG

CL FENCE
(2" MESH)
TYP.
1% 1%
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
(UPRR) R/W
(UPRR)
(STATE)

EASE RR EASE RR EASE RR EASE RR EASE RR EASE RR EASE RR EASE RR EASE RR

EASE RR EASE RR EASE RR EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR
R/W

RAILROAD BALLAST
RAILROAD BALLAST /\ /\ /\ /\ /\ /\ /\ /\ /\
rr
marker
25 26
SD
SD
SD
SD
OIL

OIL SD SD SD SD SD SD COM
COM
COM
COM
CRT = 25+27
UPRR MP = +/- 380.3

PROPOSED EASEMENT
S25°50'43"W
26+08
EB
24+48
BB

INSIDE OF TRUSS

UPRR R/W

CALTRANS R/W CALTRANS R/W

UPRR R/W
/ \
/\
/ \
/ \ / \ 25'

CLEAR ZONE
25'

CLEAR ZONE

UPRR R/W

PROPOSED EASEMENT
CALTRANS R/W 14' BC26+11.0924+32.29 EC DRAIN. EASE. CALTRANS UPRR R/W 75 100
125 80
85 90 95 105 110 115 120
75 100 80 85 9590
105 110
110
110 115 115
/ \ / \ / \ / \
/ \ / \ /\ /\ +/- 4'-6"
No Scale

TYPICAL SECTION - MIDDLE SPAN
SCALE: 1" = 10'

ELEVATION
14'-0"
(MIN. CLEAR WIDTH)
C 2'-6"
L
ABUT. 2
To
SB County
Park

BRIDGE PLAN
SCALE: 1"= 10'
SPAN
ABUT. 1
rr marker
16'-0"
(TOTAL WIDTH OF SUPERSTRUCTURE
To
Carpinteria
Ave. +/- 3'-6"
TO

CARPINTERIA
TO

VENTURA
ES

DRAINAGE
DITCH

INDEX TO BRIDGE PLANS
BR-1 GENERAL PLAN
BR-2 STRUCTURAL DESIGN CRITERIA
BR-3 GENERAL NOTES
BR-4 FOUNDATION PLAN
BR-5 BRIDGE ABUTMENT DETAILS 1
BR-6 BRIDGE ABUTMENT DETAILS 2
ES
FL
ES
ES
(N) FENCE

TOP OF SLOPE
TYP.
(N) FENCE
(N) FENCE

OIL PIPELINE

ABANDONED
36" RCP

STORM DRAIN
30" RCP STORM DRAIN
(E) FENCE
(N) GATE
(N) GATE
(N) GATE
(N) GATE
(N) GATE
(N) FENCE

RINCON TRAIL BRIDGE
0 10' 20'
SCALE 1"=10'
BR-1 BRIDGE GENERAL PLAN

PROJECT INFORMATION

1. MILE POST 380.3 SANTA BARBARA SUB, CARPINTERIA, CA

2. LATITUDE: 34°22'48.18"N LONGITUDE: 119°28'57.20"W

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
BR-1
f:\pdata\0_active projects\carp rincon trail\production drawings\carp bridge gp.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 BRIDGE PLANS MDW 57 of 119

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2 BR-2
f:\pdata\0_active projects\carp rincon trail\production drawings\carp bridge gp.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105

STRUCTURE DESIGN CRITERIA
STRUCTURE IS DESIGNED PER AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITION, 2015

CONSTRUCTION METHODS
OVERVIEW:

THIS IS A PREFABRICATED STEEL BRIDGE, WITH A CAST-IN-PLACE CONCRETE DECK. THE BRIDGE IS SUPPORTED BY A DEEP FOUNDATION SYSTEM USING CAST-IN-DRILL HOLE (CIDH) CONCRETE PILES.

DETAILS OF CONSTRUCTION METHODS;
THE BRIDGE WILL BE BUILT USING THE FOLLOWING CONSTRUCTION SEQUENCE:

BRIDGE FOUNDATION:

A) PILES: CAST-IN-DRILL HOLE (CIDH). THESE ABUTMENT PILES WILL BE BUILT BY DRILLING TO AN ELEVATION SHOWN IN "BRIDGE FOUNDATION PLAN" .

AFTER THE HOLE IS COMPLETE BAR REINFORCING STEEL WILL BE PLACED INSIDE THE HOLE USING CENTRALIZERS TO POSITION THE STEEL IN THE HOLE. FINALLY, CONCRETE WILL BE PLACED "FROM THE BOTTOM-UP", USING CONCRETE TREMIES.

B) REINFORCED CONCRETE ABUTMENTS / WING WALLS:

REINFORCED CONCRETE ABUTMENTS WILL BE CONSTRUCTED ON TOP OF THE CIDH PILES. THE ABUTMENTS / WINGWALLS WILL BE BUILT IN-PLACE USING STANDARD PLYWOOD FORMWORK. THE ABUTMENTS INCLUDE BOLTS TO TIE THE BRIDGE SUPERSTRUCTURE TO THE ABUTMENT.

BRIDGE SUPERSTRUCTURE:

THE BRIDGE SUPERSTRUCTURE IS A SHOP-BUILT STEEL TRUSS SYSTEM. THE STEEL USED IN THE BRIDGE SHALL BE COR-TEN STEEL WHICH WILL BE PAINTED LIGHT SKY BLUE, CONTRACTOR TO PROVIDE A SAMPLE/PAINT CHIP FOR APPROVAL.. THE BRIDGE WILL BE FABRICATED BY A PREQUALIFIED SUPPLIER WITH SHOP-CERTIFIED PROCEDURES.

BRIDGE DECK:

AFTER THE PREFABRICATED STEEL SUPERSTRUCTURE IS BOLTED TO THE BRIDGE ABUTMENTS, THE CONTRACTOR WILL PLACE DECK REINFORCEMENT, SUPPORTED ON THE FACTORY-BUILT "DECK PAN" BY CHAIRS OR DOBIES. BRIDGE DECK REINFORCEMENT IS BY BRIDGE FABRICATOR. NO FALSEWORK WILL BE NEEDED TO SUPPORT THIS DECK FROM BELOW. NEXT THE DECK CONCRETE WILL BE PLACED USING A BOOM PUMP. THIS DECK WILL BE FINISHED LIKELY USING HAND METHODS (COMPARED TO MECHANIZED "BIDWELL" FINISHING).

BR-2 STRUCTURE CRITERIA
& CONSTRUCTION METHODS BRIDGE PLANS HS MDW
58 of 119
GENERAL NOTES:

1. THE PROPOSED GRADE SEPARATION PROJECT SHALL NOT INCREASE THE QUANTITY AND/OR CHARACTERISTICS OF THE DRAINAGE IN THE RAILROAD'S DITCHES AND/OR DRAINAGE STRUCTURES.

2. THE ELEVATION OF THE EXISTING TOP-OF-RAIL PROFILE SHALL BE VERIFIED BEFORE BEGINNING CONSTRUCTION. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE RAILROAD PRIOR TO CONSTRUCTION.

3. THE CONTRACTOR MUST SUBMIT A PROPOSED METHOD OF EROSION AND SEDIMENT CONTROL AND HAVE THE METHOD APPROVED BY THE RAILROAD.

4. ALL SHORING SYSTEMS THAT IMPACT THE RAILROAD'S OPERATIONS AND/OR SUPPORTS THE RAILROAD'S

EMBANKMENT SHALL BE DESIGNED AND CONSTRUCTED PER CURRENT RAILROAD GUIDELINES FOR TEMPORARY SHORING.

5. ALL DEMOLITIONS WITHIN THE RAILROAD'S RIGHT-OF-WAY AND/OR DEMOLITION THAT MAY IMPACT THE RAILROAD'S TRACKS OR OPERATIONS SHALL BE IN COMPLIANCE WITH THE RAILROAD'S DEMOLITION GUIDELINES.

6. ERECTION OVER THE RAILROAD'S RIGHT-OF-WAY SHALL BE DESIGNED TO CAUSE NO INTERRUPTION TO THE RAILROAD'S OPERATION, ENABLING THE TRACK(S) TO REMAIN OPEN TO TRAFFIC PER THE RAILROAD'S REQUIREMENTS.

7. RAILROAD REQUIREMENTS DO NOT ALLOW WORK WITHIN 50 FEET OF TRACK CENTERLINE WHEN A TRAIN PASSES THE WORK SITE AND ALL PERSONNEL MUST CLEAR THE AREA WITHIN 25 FEET OF THE TRACK CENTERLINE AND SECURE ALL EQUIPMENT.

8. FALSE-WORK CLEARANCES SHALL COMPLY WITH MINIMUM CONSTRUCTION CLEARANCES.

9. ALL PERMANENT CLEARANCES SHALL BE VERIFIED BEFORE PROJECT CLOSING.

10. FOR RAILROAD COORDINATION PLEASE REFER TO THE RAILROAD MINIMUM REQUIREMENTS AS PART OF SPECIAL PROVISIONS.

BR-3 GENERAL UPRR NOTES

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2BR-3 f:\pdata\0_active projects\carp rincon trail\production drawings\carp bridge gp.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 BRIDGE PLANS MDW 59 of 119
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)
R/W
(UPRR)

EASE RR EASE RR EASE RR EASE RR EASE RR EASE RR EASE RR EASE RR EASE RR

EASE RR EASE RR EASE RR EASE RR EASE RR

EASE RR

EASE RR

EASE RR

EASE RR
R/W /\ /\ /\ /\ /\ /\ /\ /\ /\ /\
rr
marker
DH
07a
25 26
SD
SD
SD
SD
SD
OIL

OIL SD SD SD SD SD SD COM
COM
COM
COM
12' TYP.

S25°50'43"W

UPRR R/W

CALTRANS R/W CALTRANS R/W

UPRR R/W
UPRR R/W 11'
"CRT" LINE
WWLOL 22'
WWLOL
WWLOL
N45° 50' 43.02"E N64° 09' 16.98"W N64° 09' 16.98"W
N5° 50' 43.02"E
S5° 50' 43.02"W
S45° 50' 43.02"W
CALTRANS R/W 11'
WWLOL DRAIN. EASE. CALTRANS UPRR R/W 9' TYP. 9' TYP.
75 100
125 80
85 90 95 105 110 115 120 75
100 80 85 9590
105 110
110
110 115 115
/ \ / \ / \ / \
/ \ / \ 23.3' 23.3'

POINT TABLE
POINT #
1 2
3 4
5 6

NORTHING
1964060.35
1964055.28
1964050.20
1963917.70
1963912.63
1963907.56

EASTING
6114410.27
6114420.74
6114431.21
6114341.18
6114351.65
6114362.12
CALTRANS STANDARD PLANS, 2018

LINES AND SYMBOLS
A62-C
A62-A
RSP B0-1
B2-3
A10 - A-D

BRIDGE DETAILS
To
SB County
Park To
Carpinteria
Ave.

FOUNDATION PLAN
SCALE: 1"= 10'-0" L ABUT. 1 TYP
4 5
6 3
2 1
Design: AASHTO LRFD Specifications, Eighth
Edition with California Amendments
(AASHTO-CA BDS-8)
Seismic Design: Caltrans Seismic Design Criteria (SDC)
Version 2.0, April 2019
Live Loading: H 10 Design, Pedestrian Loading = 90 PSF
Seismic Loading: Site Specific Acceleration Response
Spectra Curve
Piles: See "Pile Data" table on "BRIDGE
FOUNDATION PLAN" sheet
Reinforced Concrete: f = 60,000 psi
f = 4,000 psi (Unless otherwise shown or
specified)
Structural Steel: ASTM A709 Grade 50
Steel Pipe Piles: ASTM A252, Grade 3
y
c
A3 - A-C ACRONYMS AND ABBREVIATIONS

EXCAVATION AND BACKFILL
- MISCELLANEOUS DETAILS

LIMITS OF PAYMENT FOR EXCAVATION AND

BACKFILL-BRIDGE
24" CAST-IN-DRILLED-HOLE CONCRETE PILE

LOAD RESISTANCE FACTOR DESIGN NOTES
TO

CARPINTERIA
TO

VENTURA

OIL PIPELINE

ABANDONED
36" RCP

STORM DRAIN
30" RCP STORM DRAIN
(E) FENCE

ACCELERATION RESPONSE SPECTRA
NOTES

1. VERIFY AND PROTECT ALL UPRR COMMUNICATION
& SIGNAL LINES AND OTHER UTILITIES IN AREA
C
CL ABUT. 2
0 10' 20'
SCALE 1"=10'
BR-4 BRIDGE FOUNDATION PLAN

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
BR-4
f:\pdata\0_active projects\carp rincon trail\production drawings\carp bridge gp.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 BRIDGE PLANS Notes:

1. Design tip elevations are controlled by (a) Compression (static), (b) Lateral Load, respectively.

2. The Specified Tip Elevation shall not be raised above the design tip elevations for lateral, and tolerable settlement.

3. For the specified pile tip elevations, support settlement due to the total vertical load based on the service limit state I load combination is estimated to be less than one (1) inch for both abutments. HS MDW 60 of 119
CL

ABUTMENT

APPROACH
GRADE CIDH PILE AND LENGTH OF PAYMENT 3'-0" 3" #4 SPIRAL @ 6" BOTTOM

OF FOOTING

SPECIFIED TIP
ELEVATION 4"
B B
1/2" EXPANSION
JOINT *5'-0" (MIN)
*PROVIDE
TEMP./SACRIFICIAL

CASING TO PREVENT

WET CONCRETE

SPILLAGE
1'-4"

MANUFACTURE'S CLOSURE PLATE
(TO BE APPROVED BY ENGINEER

DURING REVIEW OF SHOP DRAWING
GRADE
VARIES

APPROACH

GRADE WWLOL IS OUTSIDE FACE
2" CLR.

TYP
1'-0"
#5 @ 12"

INSIDE FACE
#5 @ 18"

OUTSIDE FACE
6"
2- #5

ADDITIONAL
#4 @ 18" VARIES
1/2" EXPANSION JOINT

RETURN FENCE CLOSES
TO BRIDGE TRUSS.
160'-0"
#8 TOT.6
2" I.D INSPECTION PIPE TOT. 2
3"
2'-0"

APPROACH GRADE
BB/EB

PREFABRICATED BRIDGE
#5 @ 6"

SEAT &/OR ANCHOR

SYSTEM BY PREFAB BRIDGE

MANUFACTURER
PILE 3" 6"
1'-0"
2" GAP
9"
2'-6" **3'-6"
CL

ABUTMENT
ABUT. 1
ELEV. 108.48
ABUT. 2
ELEV. 102.73
2" CLR.

TYP
#5 @ 6"
4" Ø WEEP HOLE -

LOCATE ON DAYLIGHT

SIDE OF BRIDGE
#7 @ 6"
#5 @ 6"
1/2" EXPANSION JOINT
GRADE
VARIES
**DIMENSION OF BRIDGE BELOW

DECK SURFACE TBD BY
MANUFACTURER.

DIMENSION SHOWN IS APPROX.

BASED ON DISCUSSION WITH

MANUFACTORER DURING
DESIGN
#5 @ 6"
5 - #7 TOTAL
8 - #7 TOTAL

MANUFACTURE'S CLOSURE PLATE
(TO BE APPROVED BY ENGINEER

DURING REVIEW OF SHOP DRAWING
CL

ABUTMENT
A
2-#5
ADDITIONAL 6"
10'-3"
A 4'-0"
_1
#4 TYP
#5 TYP #4

SEE BRIDGE

ABUTMENT
DETAILS 2
SHEET
2" CLR.

TYP
TO BRIDGE TRUSS.

CONTRACTOR TO MEASURE

AND FABRICATE
SCALE: 1" = 2'
SCALE: 1" = 2'

ABUTMENT SECTION
SCALE: 1" = 2'

WING WALL SECTION A-A
SCALE: 1" = 2'

ABUTMENT ELEVATION

CAST-IN-DRILL HOLE (CIDH)

CHECK FOR

SQUARENESS
BB EB

ABUTMENT PLAN DETAIL
SCALE: 1"= 10'-0"
B0-1 B0-3
B0-1

C POST L
1'-0" EQ
4" MAX.
(TYP)
3-1
EQ

C POST L C POST L
ABUT. 1 ABUT. 2
0 2' 4'
SCALE 1"=2'
BR-5 ABUTMENT DETAILS 1
SCALE: 1" = 2'

SECTION B-B

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES
0 1 2
BR-5
f:\pdata\0_active projects\carp rincon trail\production drawings\carp bridge gp.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 BRIDGE PLANS MDW

RSP RSP
RSP
61 of 119
HSS 3 x 2 x 3
16 4"
(MAX)3 4" SQUARE

SOLID ROD

PICKET (TYP)
TOP OF CONC. 3"
HSS3x2 TO
HSS3x3 POST
HSS 3x3x12
HSS 3x2x POST 3
16 2"
2" _2 2"
HSS 3x2 10"3" 3"
HSS 3x3 POST

TOP OF CONCRETE
BLOCKOUT 6"x412"

GROUT (SEE NOTE BELOW)
NOTE:

USE CEMENTITIOUS GROUT
WITH 1/2" MAXIMUM PEA GRAVEL.
28-DAY COM. STRENGTH = 4000 PSI _3 _3_2 PICKET DETAIL
CONNECTION DETAIL _1 ABUTMENT RAILING DETAIL
PICKET 4'-6"
SCALE: 1" = 2'
ABUTMENT RAILING DETAILS 0 2' 4'
SCALE 1"=2'

THE CITY OF

CARPINTERIA

PUBLIC WORKS

DEPARTMENT
ENGINEERING DIVISION Approved: Design Drawn Chk'd
UPRR PROJECT. NO.

DATE SHT. DES.

UPRR MILE POST CARPINTERIA RINCON MULTI USE TRAIL
441148Y SOSO

SANTA BARBARA SUB,
MP 380.49
04/23/21 FOR REDUCED PLANS ORIGINAL SCALE IS IN INCHES0 1 2BR-6 f:\pdata\0_active projects\carp rincon trail\production drawings\carp bridge gp.dwg BY: Michael Bandich HS Matt Roberts, Project Manager 360 S. Hope Ave, C-110,Santa Barbara, CA 93105 BRIDGE PLANS BR-6 ABUTMENT DETAILS 2 MDW
NOTE

CONTRACTOR TO FIELD MEASURE WING WALL WITH BRIDGE IN PLACE

AND PREPARE SHOP DRAWINGS FOR FABRICATION OF ABUTMENT

RAILING FOR APPROVAL BY THE ENGINEER
62 of 119
10+50 140 160 180 200 140 160 180 200 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 11+00 140 160 180 200 140 160 180 200 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 11+50 140 160 180 200 140 160 180 200 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 12+00 120 140 160 180 200 120 140 160 180 200 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 12+50 120 140 160 180 200 120 140 160 180 200 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 13+00 120 140 160 180 200 120 140 160 180 200 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 13+50 120 140 160 180 200 120 140 160 180 200 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 14+00 120 140 160 180 200 120 140 160 180 200 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 14+50 120 140 160 180 200 220 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 15+00 120 140 160 180 200 220 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 15+50 100 120 140 160 180 200 220 100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 16+00 100 120 140 160 180 200 220 100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 -70.91 LT (E) SEWER FM- 4"
PG:183.55 "CRT" LINE
OG: 183.5

70.81 RT (E) WATER-10"
-86.12 LT HWY-ETW
-75.54 LT HWY-ES -4.72 RT (E) OIL-ABANDONED

46.35 RT CARP AVE- ETW
-55.39 LT (E) SEWER FM- 4"
PG:182.70 "CRT" LINE
OG: 184.4

71.96 RT (E) WATER-10"
-70.66 LT HWY-ETW
-60.02 LT HWY-ES

11.47 RT (E) OIL-ABANDONED

47.31 RT CARP AVE- ETW
-42.18 LT (E) SEWER FM- 4"
PG:180.45 "CRT" LINE
OG: 183.9

70.07 RT (E) WATER-10"
-56.71 LT HWY-ETW
-46.22 LT HWY-ES

24.16 RT (E) OIL-ABANDONED

44.88 RT CARP AVE- ETW
-33.55 LT (E) SEWER FM- 4"
PG:178.00 "CRT" LINE
OG: 184.5

69.93 RT (E) WATER-10"
-48.04 LT HWY-ETW
-37.57 LT HWY-ES

32.45 RT (E) OIL-ABANDONED

46.52 RT CARP AVE- ETW
-29.47 LT (E) SEWER FM- 4"
PG:175.55 "CRT" LINE
OG: 185.1

71.96 RT (E) WATER-10"
-44.02 LT HWY-ETW
-33.47 LT HWY-ES

36.65 RT (E) OIL-ABANDONED

49.67 RT CARP AVE- ETW
-29.79 LT (E) SEWER FM- 4"
PG:173.10 "CRT" LINE
OG: 183.1

76.29 RT (E) WATER-10"
-44.16 LT HWY-ETW
-33.79 LT HWY-ES

36.91 RT (E) OIL-ABANDONED

53.93 RT CARP AVE- ETW
-31.79 LT (E) SEWER FM- 4"
PG:170.65 "CRT" LINE
OG: 180.1

85.05 RT (E) WATER-10"
-46.57 LT HWY-ETW
-36.49 LT HWY-ES

40.64 RT (E) OIL-ABANDONED

61.41 RT CARP AVE- ETW
-33.94 LT (E) SEWER FM- 4"
PG:168.20 "CRT" LINE
OG: 178.0

98.20 RT (E) WATER-10"
-49.15 LT HWY-ETW
-39.21 LT HWY-ES

56.79 RT (E) OIL-ABANDONED

73.81 RT CARP AVE- ETW
-36.38 LT (E) SEWER FM- 4"
PG:165.75 "CRT" LINE
OG: 176.3
114.19 RT (E) WATER-10"
-51.74 LT HWY-ETW
-41.36 LT HWY-ES

73.22 RT (E) OIL-ABANDONED

90.58 RT CARP AVE- ETW
-37.38 LT (E) SEWER FM- 4"
PG:163.30 "CRT" LINE
OG: 173.8
132.18 RT (E) WATER-10"
-53.18 LT HWY-ETW
-42.95 LT HWY-ES

87.64 RT (E) OIL-ABANDONED
100.85 RT CARP AVE- ETW
-38.86 LT (E) SEWER FM- 4"
PG:160.85 "CRT" LINE
OG: 170.8 148.92 RT (E) WATER-10"
-54.19 LT HWY-ETW
-43.72 LT HWY-ES

99.82 RT (E) OIL-ABANDONED
107.61 RT CARP AVE- ETW
-38.61 LT (E) SEWER FM- 4"
PG:158.40 "CRT" LINE
OG: 167.8
-54.90 LT HWY-ETW
-44.40 LT HWY-ES
109.85 RT (E) OIL-ABANDONED

TRAIL CROSS SECTIONS
0 40' 80' SCALE 1"=40' TRAIL CROSS SECTIONS -1 THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 CS-1
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-trail cross sections.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105 NOTES: 1. THESE CROSS SECTIONS DO NOT SHOW THE SLOPE REINFORCEMENT / GEO-TEXTILES. 63 of 119
17+50 100 120 140 160 180 200 220 100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 18+00 100 120 140 160 180 200 220 100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 16+50 100 120 140 160 180 200 220 100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 17+00 100 120 140 160 180 200 220 100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 18+50 100 120 140 160 180 200 220 100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 19+00 100 120 140 160 180 200 220 100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 19+50 80 100 120 140 160 180 200 220 80100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 20+00 80 100 120 140 160 180 200 220 80100 120 140 160 180 200 220 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 20+50 80 100 120 140 160 180 200 80100 120 140 160 180 200 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 -39.45 LT (E) SEWER FM- 4"
PG:155.95 "CRT" LINE
OG: 165.6
-54.78 LT HWY-ETW
-44.19 LT HWY-ES
117.85 RT (E) OIL-ABANDONED
-37.30 LT (E) SEWER FM- 4"
PG:153.50 "CRT" LINE
OG: 163.2
-54.29 LT HWY-ETW
-43.89 LT HWY-ES
123.87 RT (E) OIL-ABANDONED
-35.64 LT (E) SEWER FM- 4"
PG:151.05 "CRT" LINE
OG: 160.4
-54.08 LT HWY-ETW
-42.13 LT HWY-ES 127.98 RT (E) OIL-ABANDONED
-33.84 LT (E) SEWER FM- 4"
PG:148.60 "CRT" LINE
OG: 159.1
-139.18 LT (E) RCP SD-36"
-53.75 LT HWY-ETW
-39.95 LT HWY-ES
130.41 RT (E) OIL-ABANDONED
-32.16 LT (E) SEWER FM- 4"
PG:146.15 "CRT" LINE
OG: 157.1
-134.39 LT (E) RCP SD-36"
-53.57 LT HWY-ETW
-38.24 LT HWY-ES 135.16 RT (E) OIL-ABANDONED
-31.28 LT (E) SEWER FM- 4"
PG:143.70 "CRT" LINE
OG: 154.9
-131.45 LT (E) RCP SD-36"
-53.25 LT HWY-ETW
-36.77 LT HWY-ES 138.94 RT (E) OIL-ABANDONED
-29.78 LT (E) SEWER FM- 4"
PG:141.25 "CRT" LINE
OG: 153.3
-128.64 LT (E) RCP SD-36"
-51.98 LT HWY-ETW
-35.28 LT HWY-ES 137.34 RT (E) OIL-ABANDONED
-28.28 LT (E) SEWER FM- 4"
PG:138.80 "CRT" LINE
OG: 150.3
-125.69 LT (E) RCP SD-36"
-50.34 LT HWY-ETW
-33.99 LT HWY-ES 124.67 RT (E) OIL-ABANDONED
-26.77 LT (E) SEWER FM- 4"
PG:136.35 "CRT" LINE
OG: 149.0
-122.71 LT (E) RCP SD-36"
-48.47 LT HWY-ETW
-32.42 LT HWY-ES 112.00 RT (E) OIL-ABANDONED
0 40' 80' SCALE 1"=40' THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 CS-2
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-trail cross sections.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
TRAIL CROSS SECTIONS TRAIL CROSS SECTIONS -2
64 of 119
25+50 406080 100 120 406080100 120 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 21+00 80 100 120 140 160 180 200 80100 120 140 160 180 200 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 21+50 80 100 120 140 160 180 80100 120 140 160 180 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 22+00 80 100 120 140 160 180 80100 120 140 160 180 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 22+50 80 100 120 140 160 80100 120 140 160 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 23+00 80 100 120 140 160 80100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 23+50 6080 100 120 140 6080100 120 140 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 24+00 80 100 120 80100 120 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 24+50 80 100 120 80100 120 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 BB 24+48 80 100 120 80100 120 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 25+00 406080 100 120 406080100 120 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 26+00 6080 100 120 6080100 120 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 -25.28 LT (E) SEWER FM- 4"
PG:133.90 "CRT" LINE
OG: 145.6
-119.74 LT (E) RCP SD-36"
-46.43 LT HWY-ETW
-30.94 LT HWY-ES

99.34 RT (E) OIL-ABANDONED
-23.79 LT (E) SEWER FM- 4"
PG:131.45 "CRT" LINE
OG: 142.5
-116.77 LT (E) RCP SD-36"
-44.29 LT HWY-ETW
-29.58 LT HWY-ES

86.67 RT (E) OIL-ABANDONED
-22.27 LT (E) SEWER FM- 4"
PG:129.00 "CRT" LINE
OG: 138.9
-113.79 LT (E) RCP SD-36"
-42.40 LT HWY-ETW
-27.86 LT HWY-ES

74.00 RT (E) OIL-ABANDONED
-20.71 LT (E) SEWER FM- 4"
PG:126.55 "CRT" LINE
OG: 136.2
-110.82 LT (E) RCP SD-36"
-41.03 LT HWY-ETW
-26.33 LT HWY-ES 61.33 RT (E) OIL-ABANDONED -19.11 LT (E) SEWER FM- 4" PG:124.10 "CRT" LINE
OG: 131.0
-107.84 LT (E) RCP SD-36"
-39.45 LT HWY-ETW
-24.75 LT HWY-ES

54.19 RT (E) OIL-ABANDONED -18.35 LT (E) SEWER FM- 4"
PG:121.65 "CRT" LINE
OG: 120.6
-99.82 LT (E) RCP SD-36"
-38.84 LT HWY-ETW
-24.01 LT HWY-ES

47.63 RT (E) OIL-ABANDONED
-42.85 LT (E) SEWER FM- 4"
PG:119.33 "CRT" LINE
OG: 114.3 -45.44 LT (E) RCP SD-36"
-67.08 LT HWY-ETW
-50.72 LT HWY-ES

29.82 RT (E) OIL-ABANDONED
-120.01 LT (E) SEWER FM- 4"
PG:117.41 "CRT" LINE
OG: 111.5
-43.24 RT (E) OIL-ABANDONED
PG:115.61 "CRT" LINE
OG: 73.0
-46.49 RT (E) OIL-ABANDONED
PG:113.82 "CRT" LINE
OG: 72.6
-17.25 LT (E) COM
PG:112.02 "CRT" LINE
OG: 104.3
-118.67 LT (E) SEWER FM- 4"
PG:117.44 "CRT" LINE
OG: 111.4
-149.93 LT HWY-ETW
-41.33 RT (E) OIL-ABANDONED
0 40' 80' SCALE 1"=40' THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 CS-3
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-trail cross sections.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
TRAIL CROSS SECTIONS TRAIL CROSS SECTIONS -3
65 of 119
29+00 -20
020406080 100 120 140 160 180 -20
020406080100 120 140 160 180 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 29+50 -20
020406080 100 120 140 160 180 -20
020406080100 120 140 160 180 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 30+00 -20
020406080 100 120 140 160 -20
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 30+50 -20
020406080 100 120 140 160 -20
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 31+00 -20
020406080 100 120 140 160 -20
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 31+50 -20
020406080 100 120 140 160 -20
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140
PG:98.86 "CRT" LINE
OG: 110.4

61.14 RT (E) COM - FRONTIER
PG:96.43 "CRT" LINE
OG: 107.6

57.96 RT (E) COM - FRONTIER
PG:94.01 "CRT" LINE
OG: 108.9

55.25 RT (E) COM - FRONTIER
PG:91.58 "CRT" LINE
OG: 107.3

55.12 RT (E) COM - FRONTIER
PG:89.16 "CRT" LINE
OG: 98.6 52.39 RT (E) COM - FRONTIER
PG:86.73 "CRT" LINE
OG: 99.2 50.70 RT (E) COM - FRONTIER
0 40' 80' SCALE 1"=40' THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 CS-5
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-trail cross sections.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
TRAIL CROSS SECTIONS TRAIL CROSS SECTIONS -5
66 of 119
27+00
020406080 100 120 140 160
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 EB 26+08 80 100 120 80100 120 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 26+50 406080 100 120 140 406080100 120 140 -140 -120 -100 -80 -60 -40 -200 20 40 60 80 100 120 140 27+50 -20 020406080 100 120 140 160 -20
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 28+00 -20
020406080 100 120 140 160 -20
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 28+50 -20
020406080 100 120 140 160 -20
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140
PG:110.23 "CRT" LINE
OG: 135.1 145.59 RT (E) COM - FRONTIER
PG:108.33 "CRT" LINE
OG: 131.2

78.64 RT (E) COM - FRONTIER
PG:106.13 "CRT" LINE
OG: 117.5

71.35 RT (E) COM - FRONTIER
PG:103.71 "CRT" LINE
OG: 116.9

67.66 RT (E) COM - FRONTIER
PG:101.28 "CRT" LINE
OG: 110.9

64.40 RT (E) COM - FRONTIER
PG:111.77 "CRT" LINE
OG: 109.6
0 40' 80' SCALE 1"=40' THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 CS-4
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-trail cross sections.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
TRAIL CROSS SECTIONS TRAIL CROSS SECTIONS -4
67 of 119
33+00 -20
020406080 100 120 140 -20
020406080100 120 140 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140 33+50 -20
020406080 100 120 140 -20
020406080100 120 140 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140 34+00 -20
020406080 100 120 140 -20
020406080100 120 140 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140 34+50 -20
020406080 100 120 140 -20
020406080100 120 140 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140 35+00 -20
020406080 100 120 140 -20
020406080100 120 140 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140 35+50 -20
020406080 100 120 140 -20
020406080100 120 140 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140 32+00 -20
020406080 100 120 140 160 -20
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 32+50 -20
020406080 100 120 140 160 -20
020406080100 120 140 160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 36+00 -20
020406080 100 120 -20
020406080100 120 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140
PG:79.46 "CRT" LINE
OG: 81.8

42.77 RT (E) COM - FRONTIER
PG:77.03 "CRT" LINE
OG: 72.9

37.21 RT (E) COM - FRONTIER
PG:74.61 "CRT" LINE
OG: 69.7

32.18 RT (E) COM - FRONTIER
PG:72.18 "CRT" LINE
OG: 66.3

27.79 RT (E) COM - FRONTIER
PG:69.76 "CRT" LINE
OG: 65.5

24.15 RT (E) COM - FRONTIER
PG:67.33 "CRT" LINE
OG: 64.6

16.30 RT (E) COM - FRONTIER
PG:64.91 "CRT" LINE
OG: 64.6 13.22 RT (E) COM - FRONTIER
PG:84.31 "CRT" LINE
OG: 90.9

46.03 RT (E) COM - FRONTIER
PG:81.88 "CRT" LINE
OG: 87.5

46.33 RT (E) COM - FRONTIER
0 40' 80' SCALE 1"=40' THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 CS-6
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-trail cross sections.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
TRAIL CROSS SECTIONS TRAIL CROSS SECTIONS -6
68 of 119
36+50 -20
020406080 100 120 -20
020406080100 120 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140 37+00 -20
020406080 100 120 -20
020406080100 120 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140 37+50 -20
020406080 100 120 -20
020406080100 120 -140 -120 -100 -80 -60 -40 -20
0 20 40 60 80 100 120 140
PG:63.31 "CRT" LINE
OG: 64.5

8.15 RT (E) COM - FRONTIER
PG:63.36 "CRT" LINE
OG: 64.7 4.23 RT (E) COM - FRONTIER
PG:64.23 "CRT" LINE
OG: 64.2 5.99 RT (E) COM - FRONTIER
0 40' 80' SCALE 1"=40' THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 CS-7
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-trail cross sections.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
TRAIL CROSS SECTIONS TRAIL CROSS SECTIONS -7
69 of 119
EARTHWORK VOLUME [STA: 10+40 to 24+48] STATION 10+40.00 10+50.00 10+75.00 11+00.00 11+25.00 11+50.00 11+75.00 11+96.52 12+00.00 12+20.00 12+25.00 12+50.00 12+75.00 13+00.00 13+04.64 13+25.00 13+34.27 13+50.00 13+75.00 14+00.00 14+25.00 14+50.00 14+75.00 15+00.00 FILL AREA (SF) 3.05 1.97 0.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CUT AREA (SF) 46.37 51.53 57.27 73.72 151.06 191.87 231.67 260.57 277.46 321.48 328.82 353.79 392.37 443.10 454.20 500.60 518.15 550.92 616.93 660.71 703.76 726.83 738.51 766.31 FILL VOLUME (CY) 0.00 0.93 1.11 0.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CUT VOLUME (CY) 0.00 18.13 50.37 60.96 105.15 160.45 197.47 196.73 34.67 221.01 60.21 313.25 341.15 380.70 77.07 360.03 174.94 311.37 534.03 583.57 622.73 652.53 667.90 685.17 CUM. FILL VOL (CY) 0.00 0.93 2.03 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 CUM. CUT VOL (CY) 0.00 18.13 68.50 129.46 234.61 395.06 592.53 789.26 823.92 1044.94 1105.15 1418.40 1759.55 2140.25 2217.32 2577.35 2752.28 3063.65 3597.68 4181.25 4803.97 5456.50 6124.40 6809.57 NET VOL (CY) 01766127 232 393 590 787 822 1043 1103 1416 1757 2138 2215 2575 2750 3061 3595 4179 4802 5454 6122 6807 EARTHWORK VOLUME [STA: 10+40 to 24+48] STATION 15+25.00 15+50.00 15+75.00 15+97.48 16+00.00 16+25.00 16+50.00 16+75.00 17+00.00 17+25.00 17+50.00 17+75.00 18+00.00 18+25.00 18+50.00 18+60.68 18+75.00 19+00.00 19+25.00 19+50.00 19+75.00 20+00.00 20+25.00 20+50.00 FILL AREA (SF) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CUT AREA (SF) 834.66 876.77 927.42 935.20 936.68 962.39 974.48 1000.76 1041.99 1005.15 1049.41 1137.57 1241.94 1352.23 1472.09 1534.91 1638.55 1818.65 1913.59 1999.58 2049.02 1994.69 1887.42 1680.44 FILL VOLUME (CY) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CUT VOLUME (CY) 727.51 775.79 816.27 756.59 87.42 857.03 873.38 889.72 919.28 920.46 922.35 979.83 1063.98 1157.59 1257.64 594.91 841.35 1600.56 1727.89 1811.66 1874.35 1872.09 1797.27 1651.79 CUM. FILL VOL (CY) 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.23 2.24 2.24 2.24 2.24 2.24 2.24 CUM. CUT VOL (CY) 7537.08 8312.87 9129.14 9885.73 9973.15 10830.18 11703.56 12593.28 13512.57 14433.02 15355.38 16335.21 17399.18 18556.77 19814.42 20409.33 21250.68 22851.24 24579.13 26390.78 28265.14 30137.22 31934.50 33586.28 NET VOL (CY) 7535 8311 9127 9883 9971 10828 11701 12591 13510 14431 15353 16333 17397 18555 19812 20407 21248 22849 24577 26389 28263 30135 31932 33584 EARTHWORK VOLUME [STA: 10+40 to 24+48] STATION 20+75.00 21+00.00 21+25.00 21+50.00 21+75.00 22+00.00 22+25.00 22+50.00 22+75.00 23+00.00 23+25.00 23+37.15 23+50.00 23+75.00 23+84.72 24+00.00 24+25.00 24+32.29 24+40.00 24+47.50 24+48.00 FILL AREA (SF) 0.01 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 15.78 16.93 33.66 105.69 124.66 161.69 253.04 292.78 161.54 129.87 127.30 CUT AREA (SF) 1477.54 1343.87 1206.74 1082.77 970.33 900.64 911.99 857.37 627.98 0.00 136.36 68.40 24.40 12.10 11.78 10.47 0.00 0.00 0.00 0.00 0.00 FILL VOLUME (CY) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.30 7.36 13.49 68.66 43.14 83.61 191.48 71.64 64.90 40.47 2.38 CUT VOLUME (CY) 1462.03 1306.21 1180.84 1059.96 950.51 866.19 839.18 819.15 687.66 290.73 63.13 46.06 19.99 14.59 3.38 4.81 3.64 0.00 0.00 0.00 0.00 CUM. FILL VOL (CY) 2.24 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 2.25 9.56 16.92 30.40 99.06 142.20 225.81 417.29 488.93 553.83 594.30 596.68 CUM. CUT VOL (CY) 35048.31 36354.52 37535.36 38595.31 39545.82 40412.01 41251.19 42070.33 42758.00 43048.73 43111.86 43157.91 43177.91 43192.50 43195.87 43200.68 43204.32 43204.32 43204.32 43204.32 43204.32 NET VOL (CY) 35046 36352 37533 38593 39544 40410 41249 42068 42756 43046 43102 43141 43148 43093 43054 42975 42787 42715 42650 42610 42608 0 40' 80' SCALE 1"=40' THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 CS-8
f:\pdata\0_active projects\carp rincon trail\production drawings\crt-trail cross sections.dwg BY: Michael Bandich HS Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
TRAIL CROSS SECTIONS TRAIL CROSS SECTIONS -8 TRAILHEAD (WEST) CUT - 40 CY FILL - 19 CY OCEAN SIDE CUT - 52,800 CY FILL - 9,900 CY FREEWAY SIDE 70 of 119
GENERAL NOTES: SURVEY DATUMS INFORMATION 1. The horizontal datum for this map is based on ground control positions as contained in digital files for the 2007 aerial mapping by Golden State Aerial Surveying. Photography dated 12.12.2007. The datum is unknown but appears to be or proximate to NAD83. Epoch is unknown.

2. The vertical datum for this map is based on ground control orthometric heights as contained in digital files for the 2007 aerial mapping by Golden State Aerial Surveying. Photography dated 2007.07.07. The datum is unknown but appears to be or proximate to NAVD88.

3. Grid coordinates for aerial mapping appear to be or proximate to California State Plane Coordinate System Zone 5.

4. Survey units appear to be US Survey feet.

5. Surveying for location of monuments and other ground control were performed by REESE Water & Land Surveying Services in August & September, 2017, using both static and RTK GNSS methods. Orthometric heights for surveyed points were derived by applying a high-precision geoid model to surveyed ellipsoid heights.

6. The local survey benchmarks are points #2005 & #2006 from 2007 mapping as listed.7. The basis of bearings is the line between points #2005 and #2006 as shown: N40°15'49"W 3633.72ft. GENERAL NOTES: RIGHT OF WAY INFORMATION 1. Data for right of way, easements, or other title lines shown are derived from compiled record information tied to surveyed positions of found monumentation.

2. A Condition of Title Report, No. 5026900-5688306, dated 2018.05.10, by First American Title Insurance Co. has been used as the basis for the easement and other title information shown hereon.

3. Sources of information for title lines include, but are not limited to: Santa Barbara County deeds, State Highway Map Books, State Highway Monumentation Map Books; Santa Barbara County Assessor information; California Department of Transportation right of way maps; Union Pacific Right of Way and Track Maps.

4. No attempt to resolve gaps, gores, hiatuses, or other misalignment of record information has been made to establish a lotline or boundary that does not appear of record. This mapping shall not be construed as an establishment of record information per California B&P Code sec.8700 et seq.

5. To resolve any particular deed or map line, a survey and map shall be performed according to provisions in the Professional Land Surveyors Act, B&P sec. 8700 et seq. SURVEY CONTROL THE CITY OF CARPINTERIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION Approved: Design
Drawn
Chk'd UPRR PROJECT. NO. DATE SHT. DES. UPRR MILE POST
CARPINTERIA RINCON MULTI USE TRAIL 441148Y
SO
SO
SANTA BARBARA SUB, MP 380.49 04/23/21

FOR REDUCED PLANS

ORIGINAL SCALE IS IN INCHES
0 1 2 SC-01
f:\pdata\0_active projects\carp rincon trail\production drawings\carp-civil.dwg BY: Michael Bandich Matt Roberts, Project Manager
360 S. Hope Ave, C-110,Santa Barbara, CA 93105
MB
71 of 119

SURVEY CONTROL
72 of 119
PDF generated by deskPDF Creator Trial - Get it at http://www.docudesk.com 73 of 119
74 of 119
75 of 119
76 of 119
77 of 119
AU
MC
MC
MC
MC
AU
MC
Earth Fill (ef)
Fine-grained Silty Sand / Sandy Silt (ML) with abundant angular shale fragments - light brown, dry, slightly compact to locally loose, scattered roots and rootlets

8.0' - contact (exit): N25W, 45-50SW; ef contact exits boring Colluvium and/or Landslide Debris (Qc/Qls)
Sandy Silt (ML) matrix with scattered to abundant
shale/siltstone fragments - light gray, dry, loose, abundant rootlets

12.0' - base of colluvium / landslide debris: N50W, 51SW; slightly irregular and wavy, no clay gouge present
Bedrock: Monterey Formation (Tm)
Laminated siliceous siltstone and shale - dark gray to black, moderately hard, slabby, fractured and jointed, moderately to slightly weathered (rock weathers to light tan to cream colored), prone to sloughing and caving along bedding and jointing

12.5' - bedding: N85W, 84N (overturned); abundant rootlets and caliche

14.0' - bedding: N85W, vertical; pervasively fractured with rootlets and caliche

14.5' - 1/2" thick and discontinuous light brown silt parallel to bedding

18.0' - bedding: N80W, 87S
Slight sloughing below 18' along bedding and jointing.

20.0' - bedding: N82W, 85S
Groundwater and/or seepage not encountered. Boring
backfilled with native materials.

Bottom of borehole at 31.0 feet.
10 12
18 13
19 18
60 65
68 69
53 NP
50 NP
3 NP
R-Val
ATT
ATT
NOTES
GROUND ELEVATION 71 ft NAVD88
LOGGED BY E. Pongracz
DRILLING METHOD Track-Mounted Limited Access
DRILLING CONTRACTOR RC Drilling GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/12/18 COMPLETED 3/12/18

AT TIME OF DRILLING ---

AT END OF DRILLING ---

AFTER DRILLING ---
HOLE SIZE 24" inches
ELEV
(ft)
70 65
60 55
50 45
40 35
DEPTH
(ft)
0 5
10 15
20 25
30 35
40 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
BORING NUMBER DH 01
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:47 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
78 of 119
MC
MC
AU
MC
MC
Earth Fill (ef)
Fine-grained Silty Sand / Sandy Silt (ML) with abundant angular shale fragments - light brown, dry, slightly compact to locally loose, scattered roots and rootlets
Colluvium (Qc)
Sandy Silt (ML) matrix with rock fragments - light brown to light gray, slightly moist, medium stiff, scattered roots; includes several rock clasts dipping downslope

5.0' - Qc/bedrock contact on uphill side of boring

6.5' - contact: N49W, 35-38SW
Bedrock: Monterey Formation (Tm)
Laminated siliceous siltstone and shale - dark gray to black, moderately hard, slabby, fractured and jointed, moderately to slightly weathered (rock weathers to light tan to cream colored)

8.0' - bedding: N76W, 77NE (overturned)

10.0' - occasional weathered seam (light gray silt) along bedding, abundant rootlets

14.0' - bedding: N79W, 80NE (overturned)

14.0' - joint: N43E, 83SE; rootlet-lined

18.0' - 1/2" diameter root along fracture, rock very tight

18.0' - joint: N27E, 78SE; smooth and slightly wavy with rootlets

18.0' - joint: N27E, 83SE; caliche-lined

19.0' - bedding: N80W, 80NE (overturned)

24.0' - 1/2" diameter root along tight fracture

25.0' - bedding: N77W, 84NE
Groundwater and/or seepage not encountered. Boring
backfilled with native materials.

Bottom of borehole at 31.0 feet.
16 24
23 30
21 65
76 56
71 56
54 54
49 2
5 ATT
ATT
DS
NOTES
GROUND ELEVATION 68.5 ft NAVD88
LOGGED BY E. Pongracz
DRILLING METHOD Track-Mounted Limited Access
DRILLING CONTRACTOR RC Drilling GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/12/18 COMPLETED 3/12/18

AT TIME OF DRILLING ---

AT END OF DRILLING ---

AFTER DRILLING ---
HOLE SIZE 24" inches
ELEV
(ft)
65 60
55 50
45 40
35 30
DEPTH
(ft)
0 5
10 15
20 25
30 35
40 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
BORING NUMBER DH 02
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:47 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
79 of 119
AU
MC
MC
MC
MC
Earth Fill (ef)
Silty Sand - mottled light yellowish-brown and light
brownish-gray, moist, loose to medium compact; abundant tabular rock fragments to 6" in dimension; abrupt, downslope contact with bedrock.
0 - 2.0' - fill depth of east side of boring
0 - 7.0' - fill depth of west side of boring
Bedrock: Monterey Formation (Tm)
Siltstone - brownish gray, moderately hard, few very
fine-grained sandstone beds; locally siliceous; intensely fractured to 10'-12' below grade; bedding is locally well developed, continuous and undulatory
bedding: N23W, 54NE
bedding: N23W, 54NE (overturned)
bedding: N88W, 57NE
bedding: N88W, 57N (overturned)
bedding: N79W, 81NE
bedding: N79W, 81NE (overturned)
bedding: N78W, 67NE
bedding: N78W, 67NE (overturned)
bedding: N74W, 58NE (overturned)

22.0' - medium gray in color; some caliche stringers along tight fractures and bedding
bedding: N75W, 64NE
bedding: N75W, 64NE (overturned)
Groundwater and/or seepage not encountered. Boring
backfilled with native cuttings.

31.0' - end of boring - no groundwater
Bottom of borehole at 31.0 feet.
7 13
14 28
79 66
73 67
55 46 9
45 R-Val
ATT
NOTES
GROUND ELEVATION 65 ft NAVD88
LOGGED BY E. Pongracz
DRILLING METHOD Track-Mounted Limited Access
DRILLING CONTRACTOR RC Drilling GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF DRILLING ---

AT END OF DRILLING ---

AFTER DRILLING ---
HOLE SIZE 24" inches
ELEV
(ft)
60 55
50 45
40 35
30 DEPTH
(ft)
0 5
10 15
20 25
30 35
40 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
BORING NUMBER DH 03
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:47 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
80 of 119
AU
MC
MC
AU
MC
AU
MC
Earth Fill (ef)
Fine-grained Silty Sand / Sandy Silt (ML) with abundant angular shale fragments - light brown, dry, slightly compact to locally loose, scattered roots and rootlets
Questionable Landslide-affected rock (Qls?) or
Creep-affected Bedrock: Sisquoc Formation (Tsq)
Mudstone/Siltstone - light brownish yellow to light yellowish brown to light brownish gray, slightly moist, slightliy hard, weakly indurated, highly fractured, scattered roots, limonite weathering along fractures, discontinuous bedding structure, locally powdery

6.0' - open fractures, discontinuous bedding and powdery (dry)

9.0' - massive with rootlets, powdery

14.0' - light olive siltstone with abundant gypsum; discontinuous and asymetric open fractures to 1"-3" across with roots

15.0' - N85W, 60S; shear fabric with little to no matrix

16.5' - joint: N66E, 32SE; gypsum-lined

17.0' - fracture zone: N27E, 75-82NW; base of fracture zone with open voids and rootlets (no clay), rock improves below Bedrock: Sisquoc Formation (Tsw)
Mudstone/Siltstone - brownish gray to blue-gray to dark gray, slightly moist to moist, moderately hard, tight, locally jointed, slightly weathered, massive to vaguely bedded

18.0' - bedding (?): N65W, 75NE; gypsum-lined

18.0' - joint: N07W, 83W; oxidized

21.0' - joint: N26E, 74NW; gypsum-lined

24.0' - contact (enter): N45W, 76SE; irregular, wavy and slightly gradational contact between oxidized bedrock (above) and blue-gray, unoxidized siltstone below

29.5' - contact (exit): N76E, 76SE; moderately hard and tight blue-gray unoxidized siltstone to very fine-grained sandstone below
Groundwater and/or seepage not encountered. Boring
backfilled with native cuttings.

Bottom of borehole at 35.0 feet.
9 10
9 18
18 19
12 99
105
89 95
50 35 15
DS
ATT
DS
NOTES
GROUND ELEVATION 64.4 ft NAVD88
LOGGED BY E. Pongracz
DRILLING METHOD Track-Mounted Limited Access
DRILLING CONTRACTOR RC Drilling GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF DRILLING ---

AT END OF DRILLING ---

AFTER DRILLING ---
HOLE SIZE 24" inches
ELEV
(ft)
60 55
50 45
40 35
30 25
DEPTH
(ft)
0 5
10 15
20 25
30 35
40 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
BORING NUMBER DH 04
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:47 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
81 of 119
MC
MC
AU
MC
MC
Earth Fill (ef)
Fine-grained Silty Sand / Sandy Silt (ML) with abundant angular shale fragments - light brown, dry, slightly compact to locally loose, scattered roots and rootlets
Colluvium (Qc)
Silt (ML) to Silt with fine-grained sand and scattered rock fragments and widely scattered gravel/cobbles - light brown to light yellow brown, slightly moist, medium stiff to stiff, mottled, occasional charcoal fragment

3.0' - 4"-6' thick paleosol in colluvium sequence

3.5' - N65W, 28NE; soil exits boring

4.0' - sub-horizontal and slightly wavy contact with bedrock Bedrock: Sisquoc Formation (Tsq)
Mudstone/Siltstone - light brown to light yellowish brown to olive/brownish gray to dark olive gray (unoxidized), slightly moist to moist, moderately hard grading to hard, tight, locally jointed, slightly weathered, massive to bedded

4.5' - joint: N86W, 42S; gypsum-lined

5.0' - joint: N28W, 68SW; root-lined and slightly oxidized

6.0' - tight below

9.0' - bedding: N84E, 60N (overturned); gypsul-lined with rootlets

9.5' - bedding: N85E, 70N (overturned)

18.0' - 19.0' - gradational transition to gray mud/siltstone - moderately hard, moist, very tight

19.0' - joint: N12W, 65SW; gypsum-lined

23.0' - joint: N60W, 58SW
Groundwater and/or seepage not encountered. Boring
backfilled with native cuttings.

Bottom of borehole at 31.0 feet.
12 16
23 91
88 47
46 46
39 1
7 ATT
DS
ATT
NOTES
GROUND ELEVATION 64 ft NAVD88
LOGGED BY E. Pongracz
DRILLING METHOD Track-Mounted Limited Access
DRILLING CONTRACTOR RC Drilling GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/14/18 COMPLETED 3/14/18

AT TIME OF DRILLING ---

AT END OF DRILLING ---

AFTER DRILLING ---
HOLE SIZE 24" inches
ELEV
(ft)
60 55
50 45
40 35
30 25
DEPTH
(ft)
0 5
10 15
20 25
30 35
40 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
BORING NUMBER DH 05
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:47 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
82 of 119
AU
MC
MC
MC
MC
Earth Fill (ef)
0-1.5' - Fine-grained Sand - light tan, slightly moist, slightly dense; occasional asphalt fragment

1.5' - 1"-2" thick weak soil developed atop older fill
Fine-grained Sandy Silt (ML) with scattered gravel and rock fragments - mottled light brown, very slightly moist

6.33' - fill/Qns contact
Natural Soil (Qns)
Sandy Silt (ML) - brown, slightly moist to moist, medium stiff, caliche stringers along basal contact

7.0' - contact: N68W, 32SW; thin (1"-3") and discontinuous light brown to tan fine-grained sand (aeolian?) layer atop bedrock Bedrock: Sisquoc Formation (Tsq)
Mudstone/Siltstone - light brown to light yellowish brown to olive/brownish gray to dark olive gray (unoxidized), slightly moist to moist, moderately hard grading to hard, tight, locally jointed, slightly weathered, massive to bedded

8.0' - bedding: N84W, 67N (overturned)

8.5' - joints: N86E, 54S; N73W, 75NE

9.0' - bedding: N88W, 59N (overturned)

11.0' - bedding: N84W, 77N (overturned); well-bedded

11.0' - highly fractured interval with roots; tighter below 12.0'

16.0' - bedding: N84E, 74N (overturned)

20.0' - bedding: N86E, 79N; gray laminated siltstone

23.0' - bedding: N85W, 83N; gray to brownish gray beds or concretions of fractured dolomite (?)

23.0' - 1/8" thick brown and moist clay seams along tight fractures and jointing, discontinuous

24.0' - siltstone - olive gray to dark olive gray, slightly moist to moist, hard, tight, unoxidized
Groundwater and/or seepage not encountered. Boring
backfilled with native cuttings.

Bottom of borehole at 31.0 feet.
13 19
8 91
105
UC
NOTES
GROUND ELEVATION 64 ft NAVD88
LOGGED BY E. Pongracz
DRILLING METHOD Track-Mounted Limited Access
DRILLING CONTRACTOR RC Drilling GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/14/18 COMPLETED 3/14/18

AT TIME OF DRILLING ---

AT END OF DRILLING ---

AFTER DRILLING ---
HOLE SIZE 24" inches
ELEV
(ft)
60 55
50 45
40 35
30 25
DEPTH
(ft)
0 5
10 15
20 25
30 35
40 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
BORING NUMBER DH 06
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:47 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
83 of 119
GB
MC
GB
GB
MC
Earth Fill (ef)
Fine-grained Sandy Silt with scattered small shale fragments - light brown to light grayish brown, dry, loose to slightly compact 6" thick layer of pea gravel, continous around boring
Bedrock: Monterey Formation (Tm)
Diatomaceous Shale/Siltstone and Siliceous Shale - light tan to grayish brown, moist to slightly moist, slightly hard to very hard (well-cemented), well-bedded; continuous coring required to advance boring from 6' to bottom of borehole, slight to moderate hydrocarbon odor

4.0' - bedding: N81E, 84N (overturned); caliche-lined

5.5' - bedding: N83E, 83N (overturned)

6.0' - joint: N03E, 68W

6.5' - joint: N11W, 37W

8.0' - continued coring with 18"-24" cemented and hard blocks in cuttings

9.0' - bedding: N84W, 86N (overturned)

10.0' - bedding: N86W, 84N (overturned)

13.0' - bedding: N78W, 83N (overturned)

16.0' - bedding: N81W, 84N (overturned)
Groundwater and/or seepage not encountered. Boring
backfilled to surface with 2-sack concrete slurry.

Bottom of borehole at 21.0 feet.
16 14
20 78
NOTES
GROUND ELEVATION 114 ft NAVD88
LOGGED BY E. Pongracz
DRILLING METHOD Bucket Auger
DRILLING CONTRACTOR Tri-Valley Drilling GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 8/16/18 COMPLETED 8/16/18

AT TIME OF DRILLING ---

AT END OF DRILLING ---

AFTER DRILLING ---
HOLE SIZE 24" inches
ELEV
(ft)
110
105
100
95 90
85 80
75 DEPTH
(ft)
0 5
10 15
20 25
30 35
40 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
BORING NUMBER DH 07a
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:47 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
84 of 119
MC
MC
MC
MC
Earth Fill (ef)
Fine-grained Sandy Silt with scattered small shale fragments - light brown to light grayish brown, dry, loose to slightly compact Bedrock: Monterey Formation (Tm)
Diatomaceous Shale/Siltstone - light tan to light grayish brown, moist to slightly moist, slightly to moderately hard, well-bedded; slight to moderate hydrocarbon odor

3.0' - bedding: N88W, 83N (overturned)

3.5' - shear (bedding parallel): N86W, 84N; 1" thick sheared light tan to olive green plastic clay gouge

4.0' - joint: N11E, 78NW

10.0' - bedding: N87W, 85N (overturned)

11.0' - shear (bedding parallel): 1"-2" thick gouge zone with occasional caliche nodule

12.0' - joint: N08E, 86E
Groundwater and/or seepage not encountered. Boring
backfilled to surface with 2-sack concrete slurry.

Bottom of borehole at 16.0 feet.
19 18
19 66
86 94
NOTES
GROUND ELEVATION 115 ft NAVD88
LOGGED BY E. Pongracz
DRILLING METHOD Bucket Auger
DRILLING CONTRACTOR Tri-Valley Drilling GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 8/16/18 COMPLETED 8/16/18

AT TIME OF DRILLING ---

AT END OF DRILLING ---

AFTER DRILLING ---
HOLE SIZE 24" inches
ELEV
(ft)
110
105
100
95 90
85 80
DEPTH
(ft)
0 5
10 15
20 25
30 35
40 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
BORING NUMBER DH 07b
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:47 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
85 of 119
GB
MC
MC
GB
MC
MC
MC
GB
GB
MC
MC
1-2
1-2
1-1
1-2
5-8
6-13
4-9
Earth Fill (ef)
Fine-grained Silty Sand to Sandy Silt with scattered rock fragments - mottled light brown, slightly moist, moderately compact, scattered roots
Marine Terrace Deposits (Qtm)
Fine-grained Sand with some to trace silt - light reddish brown to light orange brown gradding to light golden brown / light tan, moist, moderately dense grading to dense

8.0' - wavy, sub-horizontal contact with gravelly to cobbly sand, scattered rootlets, minor sloughing

9.0' - 9.5' - sharp, irregular and wavy contact with highly weathered and very moist bedrock
Bedrock: Monterey Formation (Tm)
Diatomaceous Shale/Siltstone to Phosphatic/Organic Shale - light brown to light gray to light brownish gray to light rust orange, moist to very moist, very stiff to sllightly hard to moderately hard, laminated and well-bedded, moderately
grading to slightly weathered (upper 2' highly weathered)

12.0' - bedding: N72W, 81NE (overturned)

13.0' - 4"-5" long, 1/2"-3/4" wide open and discontinuous fracture on SE side of borehole

18.0' - bedding ?: N55W, 82SW

18.0' - joint: N37E, 75NW; clayey silt-lined, slightly wavy, slightly polished

24.0' - joint set: N34E, 71NW; 6" spacing

24.0' - bedding: N35W, 82NE (overturned)

26.0' - bedding: N64W, 78NE (overturned)

26.0' - joint: N22E, 78NW; slightly polished

29.5' - bedding: N42W, 78NE (overturned)

32.0' - bedding: N50W, 80NE (overturned)

34.0' - joint set: N62W, 74SW; 2" spacing

34.0' - joint set: N39E, 72NW; 4" spacing

37.5' - shear: E-W, 71S; siliceous shale on footwall, phosphatic shale of hanging wall

38.0' - shear (bedding parallel): N42W, 68NE; 2"-3" thick oxidized, weathered and sheared, offset by shear at 37.5'

38.5' - bedding: N40W, 78NE (overturned)

40.0' - bedding: N41W, 81NE (overturned)
Laminated phosphatic shale with abundant small phosphate nodules - off-white to light gray, scattered gypsum-lined and tight fractures
Groundwater and/or seepage not encountered. Boring
backfilled with native materials.

Bottom of borehole at 55.0 feet.
5 5
25 17
38 38
22 32
80 83
77 71
84 67
56 43
42 24
14 DS, ATT

DS, ATT
DS
NOTES
GROUND ELEVATION 206.5 ft NAVD88
LOGGED BY E. Pongracz
DRILLING METHOD Bucket Auger
DRILLING CONTRACTOR Tri-Valley Drilling GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 8/17/18 COMPLETED 8/17/18

AT TIME OF DRILLING ---

AT END OF DRILLING ---

AFTER DRILLING ---
HOLE SIZE 24" inches
ELEV
(ft)
205
200
195
190
185
180
175
170
165
160
155
150
DEPTH
(ft)
0 10
20 30
40 50
60 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
BORING NUMBER DH 08
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:47 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
86 of 119
GB
1 MC
2 MC
3 Earth Fill (ef)
Silty Gravel (GP) - yellowish brown, very dense, slightly moist, medium to coarse-grained, with gravel to 1", pieces of plastic, asphalt and paper
some clay binder
dark brown to whitish brown; with numerous sandstone and shale fragments
Silty Sand (SM) - dark brown, very dense, slightly moist, fine- to medium-grained sand, with whitish tan lenses.

Switched to augers
Terrace Deposits (Qtm)
Sand (SP) - light reddish tan, dense, slightly moist,
fine-grained
No water, no caving
Bottom of test pit at 7.5 feet.
16 19
3 74
110
SHEAR,
MAX
NOTES
GROUND ELEVATION 185 ft
LOGGED BY G. Masterman
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 7.5 ELEV (ft)
185.0
182.5
180.0
177.5
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 01
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
87 of 119
MC
1 MC
2 MC
3 MC
4 Earth Fill (ef)
Silty Gravel (GM) - dark brown to reddish brown, medium dense, slightly moist, gravel to 1/2", organic rich in upper

0.5'.

Terrace Deposits (Qtm)
Sand (SP) to Silty Sand (SM) - dark brown to reddish tan, dense, slightly moist, fine- to medium-grained, occasional 1" gravel
tree roots to 1.5" dia., porous
Switched to hand auger at 3' below grade
reddish brown
No water, no caving
Bottom of test pit at 10.5 feet.
3 2
4 3
107
108
107
103
SHEAR
SHEAR
NOTES
GROUND ELEVATION 186 ft
LOGGED BY G. Masterman
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 7.5

10.0 ELEV (ft)
185.0
182.5
180.0
177.5
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 02
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
88 of 119
MC
1 MC
2 Terrace Deposits (Qtm)
Sand (SP) - reddish brown, dense, slightly moist, fine- to medium-grained
No water, no caving
Bottom of test pit at 6.0 feet.
5 1
105
101
SHEAR
NOTES
GROUND ELEVATION 180 ft
LOGGED BY G. Masterman
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 ELEV (ft)
180.0
177.5
175.0
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 03
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
89 of 119
Earth Fill (ef)
Gravelly Silt (ML) - brown, slightly moist, medium dense, abundant roots, slighlty wavy and horizontal contact with underlying bedrock and terrace sands.
*Fault (presumably the Carpinteria Fault) places Monterey Formation bedrock (Tm) in contact with Terrace Sands (Qt).

Fault: N62W/82S; 1/8" to 1/2" thick brown clay gouge w/ slickensided surface on Tm bedrock, fault places Tm in
contact with sandy terrace deposits (Qt)
bedding: N752W/60S
Bottom of test pit at 5.0 feet.

NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/24/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 ELEV (ft)
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 04
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
90 of 119
MC
1 Earth Fill (ef)
Silty Gravel (GM) - dark brown to black, medium dense to dense, moist, numerous roots, angular gravels from 1/2" to 1"
Bedrock: Monterey Formation (Tm)
Siliceous Shale - dark gray to black, moderately hard,
slabby, tightly fractured, slightly weathered, shear surface on south side of test pit
Bottom of test pit at 3.0 feet.
27 67 54 48 ATT,
SHEAR 6
NOTES
GROUND ELEVATION 164 ft
LOGGED BY G. Masterman
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft) 0 1
2 3 ELEV (ft)
164
163
162
161
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 05
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
91 of 119
MC
1 Earth Fill (ef)
Silt (ML) with some Sand and scattered rock fragments - light brown, slightly dense, slightly moist, abundant roots Bedrock: Monterey Formation (Tm)
Siliceous Shale and Chert - dark gray to black, moderately hard, slabby, tightly fractured
Test pit backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of test pit at 2.5 feet.
14 73
NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/24/13 COMPLETED 4/24/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft) 0 1
2 ELEV (ft)
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 06
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
92 of 119
MC
1 MC
2 Slopewash (Qsw)
Sandy Silt / Silty Sand (SM) with scattered rock fragments - light brown, slightly dense, slightly moist, scattered roots Bedrock: Santa Barbara Formation (Qsb)
Sand to Silty Sand with cemented zones and scattered
concretions - light yellowish brown, very dense to
moderately hard, moist, fossiliferous (broken shell hash) Test pit backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of test pit at 3.5 feet.
11 13
98 99 SHEAR
NOTES
GROUND ELEVATION 140 ft
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/24/13 COMPLETED 4/24/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft) 0 1
2 3 ELEV (ft)
140
139
138
137
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 07
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
93 of 119
Slopewash (Qsw)
Sandy Silt (ML) with scattered rock fragments - light brown, slightly dense, slightly moist, scattered roots
Fault Zone (Sheared bedrock)
Test pit excavated on supposed Carpinteria fault trace
Complex zone of shearing/faulting which brings into contact Monterey (Tm) and Santa Barbara (Qsb) formations. Tm
thrust up and over Qsb.

Shear: N50W/16SW; base of 3" thick, brown sheared clay
Test pit backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of test pit at 3.0 feet.

NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/24/13 COMPLETED 4/24/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft) 0 1
2 3 ELEV (ft)
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 08
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
94 of 119
MC
1 Slopewash (Qsw)
Sandy Silt (ML) with scattered rock fragements - light brown, soft to loose, slightly moist, scattered roots, downhill sloping contact.

Bedrock: Monterey Formation (Tm)
Siliceous Shale and Diatmoceous Shale - gray to light
brown, slightly to moderately hard, well-bedded, tightly fractured, slightly weathered
bedding: N65W/Vert
Test pit backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of test pit at 2.5 feet.
14 99
NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/24/13 COMPLETED 4/24/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft) 0 1
2 ELEV (ft)
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 09
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
95 of 119
GB
2 MC
1 Earth Fill (ef)
Sandy, Clayey Silt (ML) with scattered rock fragments - light brown, medium stiff, moist, mottled, few roots
Bedrock: Monterey Formation (Tm)
Siliceous Shale and Shale - gray to light brown, slightly to moderately hard, well-bedded, tightly fractured, moderately weathered and highly fractured to 2.5' below grade
bedding: N85W/82N (overturned)
Test pit backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of test pit at 3.5 feet.
16 16 80 SHEAR,
CHEM
NOTES
GROUND ELEVATION 117 ft
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/24/13 COMPLETED 4/24/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft) 0 1
2 3 ELEV (ft)
117
116
115
114
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 10
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
96 of 119
Earth Fill (ef) or Landslide Debris (Qls)
Silt with some Sand and trace cley with abundant rock
fragments and cobbles - brown, stiff, dry to slightly moist, scattered roots, mottled.
@4' - Layer of mixed seaweed and large rock fragments
Beach Sand (Qbs)
Fine- to medium-grainded Sand with scattered cobbles -
light brown to tan, loose to slightly dense, dry, prone to caving
Test pit backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of test pit at 6.0 feet.

NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/25/13 COMPLETED 4/25/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 ELEV (ft)
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 11
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
97 of 119
GB
1 MC
2 MC
3 Earth Fill (ef)
Silt with some Sand (ML) with scattered shale fragments, stiff, slightly moist, porous with scattered roots, few bits of trash
@4'-8" - Brown Clayey Silt (ML) with scattered small angular to rounded rock fragments, moist, occasional shell
fragments (weakly developed soil ?)
Beach Sand (Qbs)
Fine- to medium-grainded Sand with scattered cobbles -
light brown to tan, loose to slightly dense, dry, prone to caving
Test pit backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of test pit at 6.0 feet.
18 17
87 90
SHEAR
NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/25/13 COMPLETED 4/25/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 ELEV (ft)
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 12
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
98 of 119
Earth Fill (ef)
Silt with some Sand (ML) with abundant shale fragments - light brown, soft and loose, dry, prone to sloughing and caving
@7' begin to hand auger
Beach Sand (Qbs)
Fine- to medium-grainded Sand with scattered cobbles -
light brown to tan, loose to slightly dense, dry, prone to caving
@~8' hand auger refusal on small rounded cobble. Probable contact with Qbs
Test pit backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of test pit at 8.0 feet.

NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/25/13 COMPLETED 4/25/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 7.5 ELEV (ft)
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 13
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
99 of 119
MC
1 Earth Fill (ef)
Silt with some Sand (ML) with scattered to abundant shale fragments, stiff, slightly moist, porous with scattered roots, few bits of trash
@ 6' - begin to hand auger
Beach Sand (Qbs)
Fine- to medium-grainded Sand with scattered cobbles -
light brown to tan, loose to slightly dense, dry, prone to caving
Unable to advance auger due to cobble(s).

Test pit backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of test pit at 8.8 feet.
14 83 SHEAR
NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Mike's Excavating Service GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/25/13 COMPLETED 4/25/13

AT TIME OF EXCAVATION --- AT END OF EXCAVATION --- AFTER EXCAVATION --- TEST PIT SIZE 24 x 36 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 7.5 ELEV (ft)
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
TEST PIT NUMBER TP 14
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
100 of 119
MC
GB
MC
Earth Fill (ef)
Fine-grained Silty Sand / Sandy Silt (ML) with abundant angular shale fragments - light brown, dry to slightly moist, slightly compact to locally loose, scattered roots and rootlets

4.0' - 18" diameter, slightly corroded metal conduit on uphill (north) side of test pit

6.0' - test pit excavation halted due to caving
Bottom of test pit at 6.0 feet.
10 4
5 84
81 NP NP NP ATT
NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 15
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
101 of 119
Earth Fill (ef)
Fine-grained Silty Sand / Sandy Silt (ML) with abundant angular shale fragments - light brown, dry to slightly moist, slightly compact to locally loose, scattered roots and rootlets Refusal at 1.0' below grade.

Bottom of test pit at 1.0 feet.

NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 16
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
102 of 119
MC
MC
Slopewash (Qsw)
Sand with silt (SW/SM) - light brown, slightly moist, loose Terrace Deposits (Qt)
Fine- to medium-grained Sand with occasional gravel - light yellow, slightly moist, very dense and locally slightly cemented; medium-bedded and laminated

4.5' - test pit refusal on large cobbles
Bottom of test pit at 4.5 feet.
15 10
98 95
72 DS
NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 17
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
103 of 119
MC
Terrace Deposits (Qt)
Fine- to medium-grained Sand to Gravelly Sand - light brown to light reddish brown, slightly moist, dense to very dense Bottom of test pit at 4.0 feet. 4 110
NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 18
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
104 of 119
Earth Fill (ef)
Silt to Sandy Silt (ML) matrix with shale fragments - light brown to light brownish yellow, dry to slightly moist, slightly compact, scattered roots and rootlets, occasional asphalt concrete fragments
Natural Soil (Qns) / Colluvium (Qc)
Fine-grained Sandy Silt (ML) to Clayey Silt with occasional small weathered rock fragment - medium brown, slightly moist, medium stiff, locally slightly porous, scattered rootlets, occasional caliche stringer
Beach Sand (Qbs)
Fine- to medium-grained Sand with scattered cobbles - light brown to tan, loose to slightly dense, dry, prone to caving Cobbles and small boulders along sub-horizontal contact with bedrock
Bedrock: Sisquoc Formation (Tsq)
Siltstone - gray, moist, moderately hard, tight, slightly weathered
Bottom of test pit at 9.0 feet.

NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 19
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
105 of 119
Earth Fill (ef)
Sandy Silt (ML) matrix with shale fragments - light brown, slightly moist, slightly compact, scattered roots; grades to dark brown Clayey Silt with rock fragments
Beach Sand (Qbs)
Cobbly fine- to medium-grained Sand - light brown to tan, loose to slightly dense, dry, prone to caving
Bottom of test pit at 7.0 feet.

NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 20
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
106 of 119
MC
MC
Earth Fill (ef)
Silt to Sandy Silt (ML) matrix with shale fragments - light brown to light brownish yellow, dry to slightly moist, slightly compact, scattered roots, occasional asphalt concrete fragment
Landslide Debris (Qls)

4.5' - 7.5' - Highly fractured and brecciated siltstone fragments with little to no matrix - light yellow brown, dry, scattered roots, massive

7.5' - Qls becomes matrix-supported (light to medium brown clayey silt with scattered small rock fragments)
Beach Sand (Qbs)
Cobbly fine- to medium-grained Sand - light brown to tan, loose to slightly dense, dry, prone to caving
Bottom of test pit at 10.0 feet.
10 15
87 86
37 44
26 28
11 16
ATT

DS, ATT
NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 21
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
107 of 119
GB
MC
MC
GB
GB
MC
Earth Fill (ef)
Silt to Sandy Silt (ML) matrix with shale fragments - light brown to light brownish yellow, dry to slightly moist, slightly compact, scattered roots and rootlets, occasional asphalt concrete fragments
Hand-auger from 5' below grade.

Beach Sand (Qbs)
Fine- to medium-grained Sand grading to Cobbly Sand - light brown to tan, loose to slightly dense, dry, prone to caving Bedrock: Monterey Formation (Tm)
Siltstone - gray, moist, moderately hard, hydrocarbon odor Bottom of test pit at 10.5 feet.
10 9
0 2
13 33
66 103
79 2
DS
NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 22
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
108 of 119
Earth Fill (ef)
Silt to Sandy Silt (ML) matrix with shale fragments - light brown to light brownish yellow, dry to slightly moist, slightly compact, scattered roots and rootlets
Hand-augered from 5' below grade.

Beach Sand (Qbs)
Fine- to medium-grained Sand grading to Cobbly Sand - light tan, dry, loose
Colluvium (Qc)
Silty Sand to Sandy Silt (SM/ML) matrix with scattered to abundant shale fragments - light brown to light brownish yellow, dry to slightly moist, porous with caliche
Beach Sand (Qbs)
Fine- to medium-grained Sand grading to Cobbly Sand - light tan, dry, loose
Bottom of test pit at 10.0 feet.

NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 23
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
109 of 119
Landslide Debris/Colluvium (Qls/Qc) or Mudflow Deposits Silt with fine-grained Sand to Clayey Silt (ML) matrix with scattered to abundant weathered shale and tabular shale fragments - light brown to light orange brown, slightly moist, medium stiff to stiff, matrix-supported, massive with no internal structure
*Test pit excavated below a 5'-7' high near vertical cut exposing Qls/Qc
Beach Sand (Qbs)
Cobbly fine- to medium-grained Sand - light brown to tan, dry, loose to slightly dense, prone to caving
Bottom of test pit at 10.0 feet.

NOTES

GROUND ELEVATION
LOGGED BY E. Pongracz
EXCAVATION METHOD Hand-Dug Test Pit
EXCAVATION CONTRACTOR Juan's Landscaping GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 3/13/18 COMPLETED 3/13/18

AT TIME OF EXCAVATION ---

AT END OF EXCAVATION ---

AFTER EXCAVATION ---
TEST PIT SIZE 24" x 36" inches
ELEV
(ft)
DEPTH
(ft)

0.0 2.5

5.0 7.5

10.0 SAMPLE TYPE
NUMBER
BLOW
COUNTS
(N VALUE)

GRAPHIC
LOG

MATERIAL DESCRIPTION

MOISTURE
CONTENT (%)
DRY UNIT WT.
(pcf)
LIQUID
LIMIT

PLASTIC
LIMIT

PLASTICITY
INDEX

FINES CONTENT
(%)

ATTERBERG
LIMITS
OTHER
TESTS
PAGE 1 OF 1
TEST PIT NUMBER TP 24
BENGAL BH V2 - BENGAL V1.GDT - 1/13/19 19:50 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\7000Q V2.GPJ CLIENT City of Carpinteria, Parks and Recreation Dept.

PROJECT NUMBER
PROJECT NAME Rincon Multi-Use Trail
PROJECT LOCATION Carpinteria, Santa Barbara County, CA
Bengal Engineering
360 South Hope Avenue, Suite C-110
Santa Barbara, CA 93105
Telephone: 805-563-0788
110 of 119
Slopewash (Qsw)
Sandy Silt (ML) to Silty Sand (SM) - light brown to brown, loose, moist, abundant roots and rootlets, 30°-40° downhill sloping contact
Terrace Deposit (Qt) ?
Silty Sand (SM) to Sand w/ Silt (SP) grading to
cobble/boulder with sand matrix interval - pale yellow to brownish yellow, dense, moist, few scattered roots, boulders to 24" diameter
Test trench backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of borehole at 6.0 feet.

NOTES
GROUND ELEVATION 67 ft
LOGGED BY E. Pongracz
DRILLING METHOD Backhoe Test Pit
DRILLING CONTRACTOR Mac Brown Excavating GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF DRILLING --- AT END OF DRILLING --- AFTER DRILLING --- HOLE SIZE 30 x 96 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 ELEV (ft)

65.0 62.5
MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
BORING NUMBER TT 01
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
111 of 119
MC
1 MC
2 MC
3 GB
4 Colluvium / Landslide Debris (Qcol/Qls)
Heterogenous mix of silt with some clay (matrix) and
scattered to abundant rock fragments - light brown to brown, loose to slightly stiff, slightly moist, abundant AC fragments in upper 2'
@8' - diffuse and gradational downhill-sloping contact with weathered and highly fractured mudstone
Bedrock: Sisquoc Formation (Tsq)
Mudstone - light brownish gray, slightly hard, weakly
indurated, highly fractured and moderately weathered to 11' below grade, scattered roots, limonite weathering along fractures, massive
Test trench backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of borehole at 13.0 feet.
17 10
11 33
79 108
107
46 29 ATT,
SHEAR
SHEAR
CHEM
17 NOTES
GROUND ELEVATION 66 ft
LOGGED BY E. Pongracz
DRILLING METHOD Backhoe Test Pit
DRILLING CONTRACTOR Mac Brown Excavating GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF DRILLING --- AT END OF DRILLING --- AFTER DRILLING --- HOLE SIZE 30 x 96 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 7.5

10.0 12.5 ELEV (ft)

65.0 62.5

60.0 57.5

55.0 MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
BORING NUMBER TT 02
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
112 of 119
Colluvium / Landslide Debris (Qcol/Qls)
Clast-supported mix of light grayish brown mudstone
fragments in brown silty matrix - contains zones of light brown silt/clayey silt infill, dry to slightly moist, abundant roots and rootlets
@11' - ~16° dip on sharp slide contact, 2"-3" thick zone of brown clayey silt (ML) matrix with scattered, small highly weathered mudstone fragments, moist, few roots
Bedrock: Sisquoc Formation (Tsq)
Mudstone - light brownish gray, slightly hard, limonite weathering along fractures, massive and weakly indurated Test trench backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of borehole at 13.5 feet.

NOTES
GROUND ELEVATION 67 ft
LOGGED BY E. Pongracz
DRILLING METHOD Backhoe Test Pit
DRILLING CONTRACTOR Mac Brown Excavating GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF DRILLING --- AT END OF DRILLING --- AFTER DRILLING --- HOLE SIZE 30 x 96 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 7.5

10.0 12.5 ELEV (ft)

65.0 62.5

60.0 57.5

55.0 MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
BORING NUMBER TT 03
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
113 of 119
GB
1 Slopewash (Qsw)
Silty with minor clay and scattered rock fragments - light brown, loose, porous, abundant roots, contains few bits of trash
@2.5' - steeply sloping and sharp contact with Tm bedrock Bedrock: Monterey Formation (Tm)
Diatomaceous Shale - light brown, slightly to moderately hard, moist, thinly bedded, upper 2.5' highly weathered and fractured with abundant roots (better below)
bedding: N84W/60N (overturned)
bedding: N86W/64N (overturned)
Test trench backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of borehole at 7.0 feet.
15 CHEM
NOTES
GROUND ELEVATION 68 ft
LOGGED BY E. Pongracz
DRILLING METHOD Backhoe Test Pit
DRILLING CONTRACTOR Mac Brown Excavating GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF DRILLING --- AT END OF DRILLING --- AFTER DRILLING --- HOLE SIZE 30 x 96 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 ELEV (ft)

67.5 65.0

62.5 MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
BORING NUMBER TT 04
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
114 of 119
Slopewash (Qsw)
Abundant shale fragments in light brown silty matrix - dry, loose, scattered trash and debris, wedge thickens towards base of slope, abundant roots
Bedrock: Monterey Formation (Tm)
Shale and Diatomaceous Shale - brown to light brown,
slightly to moderately hard, moist, thinly bedded
bedding: E-W/74N (overturned)
Test trench backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of borehole at 7.0 feet.

NOTES
GROUND ELEVATION 70 ft
LOGGED BY E. Pongracz
DRILLING METHOD Backhoe Test Pit
DRILLING CONTRACTOR Mac Brown Excavating GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF DRILLING --- AT END OF DRILLING --- AFTER DRILLING --- HOLE SIZE 30 x 96 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 ELEV (ft)

70.0 67.5

65.0 MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
BORING NUMBER TT 05
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
115 of 119
Slopewash (Qsw)
Abundant shale fragments in light brown silty matrix - dry, loose, prone to caving, wedge thickens towards base of
slope, abundant roots
Bedrock: Monterey Formation (Tm)
Shale and Diatomaceous Shale - brown to light brown,
slightly to moderately hard, moist, thinly bedded, highly fractured with abundant rootlets
bedding: N85W/52N (overturned)
Test trench backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of borehole at 8.0 feet.

NOTES
GROUND ELEVATION 72 ft
LOGGED BY E. Pongracz
DRILLING METHOD Backhoe Test Pit
DRILLING CONTRACTOR Mac Brown Excavating GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF DRILLING --- AT END OF DRILLING --- AFTER DRILLING --- HOLE SIZE 30 x 96 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 7.5 ELEV (ft)

70.0 67.5

65.0 MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
BORING NUMBER TT 06
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
116 of 119
GB
1 Slopewash (Qsw)
Abundant shale fragments in light brown silty matrix - dry, loose, prone to caving, wedge thickens towards base of
slope, abundant roots
Bedrock: Monterey Formation (Tm)
Laminated siliceous siltstone and shale - dark gray to black, moderately hard, slabby, fractured and jointed, moderately to slightly weathered (rock weathers to light tan to cream colored)
bedding: N85W/Vert
joint set: N18E/62NW (~4" spacing)
Test trench backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of borehole at 6.5 feet.
18 CHEM
NOTES
GROUND ELEVATION 74 ft
LOGGED BY E. Pongracz
DRILLING METHOD Backhoe Test Pit
DRILLING CONTRACTOR Mac Brown Excavating GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF DRILLING --- AT END OF DRILLING --- AFTER DRILLING --- HOLE SIZE 30 x 96 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 ELEV (ft)

72.5 70.0

67.5 MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
BORING NUMBER TT 07
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
117 of 119
Earth Fill (ef)
Silt to Clayey Silt (ML) with scattered to abundant rock fragments - light brown, stiff, moist, mottled, scattered roots Bedrock: Monterey Formation (Tm)
Laminated siliceous siltstone and shale - dark gray to black, moderately hard, slabby, fractured and jointed, slightly weathered
bedding: N65W/53NE (overturned)
bedding: N82W/71N (overturned)
Test trench backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of borehole at 6.5 feet.

NOTES
GROUND ELEVATION 75 ft
LOGGED BY E. Pongracz
DRILLING METHOD Backhoe Test Pit
DRILLING CONTRACTOR Mac Brown Excavating GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF DRILLING --- AT END OF DRILLING --- AFTER DRILLING --- HOLE SIZE 30 x 96 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 ELEV (ft)

75.0 72.5

70.0 MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
BORING NUMBER TT 08
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
118 of 119
Earth Fill (ef)
Silt to Clayey Silt (ML) with scattered to abundant rock fragments - light brown, stiff, moist, mottled, scattered roots Natural Soil (Qns)
Clayey Silt with scattered rock fragments - brown, slightly moist to moist, scattered roots
Colluvium (Qcol)
Brecciated Tm in brown, clayey silt (ML) matrix - varies from clast- to maxtrix-supported
@8' - irregular, gently S dipping contact with Tm
Bedrock: Monterey Formation (Tm)
Laminated siliceous siltstone and shale - dark gray to black, moderately hard, slabby, fractured and jointed, slightly weathered
bedding: N77E/74NW (overturned)
bedding: N78E/69NW (overturned)
Test trench backfilled with native materials. Groundwater and/or seepage was not encountered.

Bottom of borehole at 10.0 feet.

NOTES
GROUND ELEVATION 75 ft
LOGGED BY E. Pongracz
DRILLING METHOD Backhoe Test Pit
DRILLING CONTRACTOR Mac Brown Excavating GROUND WATER LEVELS:

CHECKED BY
DATE STARTED 4/23/13 COMPLETED 4/23/13

AT TIME OF DRILLING --- AT END OF DRILLING --- AFTER DRILLING --- HOLE SIZE 30 x 96 inches GRAPHIC LOG BLOW COUNTS (N VALUE) SAMPLE TYPE NUMBER DEPTH (ft)

0.0 2.5

5.0 7.5

10.0 ELEV (ft)

75.0 72.5

70.0 67.5

65.0 MATERIAL DESCRIPTION UNDRAINED SHR STRENGTH (tsf) MOISTURE CONTENT (%) DRY UNIT WT. (pcf) LIQUID LIMIT PLASTIC LIMIT

ATTERBERG
LIMITS FINES CONTENT (%) OTHER TESTS PLASTICITY INDEX
PAGE 1 OF 1
BORING NUMBER TT 09
CLIENT City of Carpinteria, Parks and Recreation Dept

PROJECT NUMBER
PROJECT NAME Carp Rincon Trail Bikeway
PROJECT LOCATION Carpinteria, SB County, CA
BENGAL GEOTECH BH V5 - BENGAL MOD GINT STD US LAB 2-10-10.GDT - 7/3/13 10:04 - C:\PROGRAM FILES (X86)\GINT\PROJECTS\CARP RINCON TRAIL BIKEWAY.GPJ Bengal Engineering
250 Big Sur Drive
Goleta CA 93117
Telephone: (805) 685-6511
119 of 119
Attachment A
Exhibit 3: Recommended
Conditions of Approval
Rincon Trail Project Appeal
19-2015-CUP/CDP
City Council Hearing, March 28, 2022
Conditions of Approval, Resolution No. 6111