Cities Index.
Agenda packet

Carpinteria City Council
May 28, 2024

Document
Agenda packet
Meeting
May 28, 2024
Body
Carpinteria City Council
Pages
11
Original file
26.0 MB
Text extracted from the city's file for reading and search. Open the original on carpinteriaca.api.civicclerk.com. That file is the official record.

City of Carpinteria
City Council Regular Meeting Agenda
Monday, May 28, 2024
Council Chamber, 5775 Carpinteria Avenue, Carpinteria, CA 93013 5:30 p.m. Regular Meeting
In-Person and Virtual Participation Options
AMENDED AGENDA – REVISED TITLE OF AGENDA ITEM NO. 10
Attendance/Viewing Options:
• Attend the in-person meeting in City Council Chambers at City Hall (5775 Carpinteria Ave.).
• View the meeting live through the City’s website (https://carpinteriaca.gov/cityhall/agendas-meetings/). • View the meeting on Government Access Television Channel 21 (broadcast live and rebroadcast on the Wednesday and the Saturday following the meeting at 8:00 p.m. and 5:00 p.m., respectively).
• Call 669-900-9128 (and enter Webinar ID 889 0390 2262) to listen to the meeting. • Join the City’s Zoom webinar by CLICKING HERE. Alternatively, you can join the Zoom webinar by logging on to www.zoom.us, downloading the application, selecting “Join Meeting”, and entering Webinar ID 889 0390 2262. • Spanish interpretation will be available at the in-person meeting and through the City’s Zoom webinar.

Public Comments
• Provide a live public comment in City Council Chambers at City Hall (5775 Carpinteria Ave.).
• Provide a live comment through the City’s Zoom webinar platform (through the link provided above). To make public comments through this platform please use the “raise your hand” feature to notify staff that you would like to make a public comment during designated public comment times. Once it is your turn to provide a public comment, staff will unmute your microphone and you will be given a designated amount of time to provide your comment. At the end of your comment, staff will once again mute your microphone.
• Submit a written comment (as either a general public comment or on a specific agenda item) to be distributed to Council Members by 12:00 P.M. on the day of the meeting by either submitting your comment via (1) email to [email protected], or (2) the eComment link on the City's agenda website available at https://carpinteriaca.gov/city-hall/agendas-meetings/.

City Council Regular Meeting Agenda
May 28, 2024

Page 2 ends

Please reference the agenda item to which your comment pertains. Although written comments become part of the record, they will not be read aloud at the meeting.

Please note that the City will make every effort to make the meeting accessible virtually; however, if one of the above virtual attendance/viewing or public comment options is unavailable due to technological issues, you are invited to take advantage of one of the other participation options outlined above (including attending and providing public comment in-person in the City Council Chambers). Additional options may be made available at the meeting.

Levine Act Warning
Applicants and their agents before the City Council are subject to the campaign disclosure provisions detailed in Government Code Section 84308. No City Council Member may accept, solicit, or direct a contribution of more than $250 from any party or agent for 12 months following the date a final decision is rendered by the City. This prohibition commences when an application has been filed, or the proceeding is otherwise initiated. A party to a City proceeding—which includes both applicants and agents—shall disclose on the record of the proceeding any contribution of more than $250 made to any Council Member by the applicant or agent, during the preceding 12 months. No party to a City proceeding, or agent, shall make a contribution to a Council Member during the proceeding and for 12 months following the date a final decision is rendered by the City. Prior to rendering a decision on a City proceeding, any Council Member who received contribution of more than $250 within the preceding 12 months from any party, or agent, to a proceeding shall disclose that fact on the record of the proceeding, and shall be disqualified from participating in the proceeding. However, if any Council Member receives a contribution that otherwise would require disqualification, and returns the contribution within 30 days of knowing about the contribution and the relevant proceeding, the Council Member shall be permitted to participate in the proceeding. If you believe that these provisions apply to you or a Council Member, please inform the City Clerk at the earliest possible opportunity.

Failure to do so may affect the City’s ability to process your application.

CALL TO ORDER

ROLL CALL

PLEDGE OF ALLEGIANCE
COUNCILMEMBER(S) REQUEST FOR REMOTE PARTICIPATION UNDER AB 2449:

The City Council may consider Councilmember(s) request to participate in the meeting remotely under the regulations of AB 2449 by making the necessary findings and voting on whether the Councilmember(s) may participate remotely.

City Council Regular Meeting Agenda
May 28, 2024

Page 3 ends

AGENDA MODIFICATIONS: The City Council may modify the regular agenda by tabling items, adding urgency items to the agenda, or changing the order in which items are considered. Changes to the Consent Calendar are considered at the time the Consent Calendar is considered.

INTRODUCTIONS, PROCLAMATIONS AND PRESENTATIONS:

1. Proclamation Celebrating the 160th Anniversary of Girls Inc. (Requires approval prior to presentation of proclamation.)

2. New Employee Introduction: Jeanette Gant, Parks, Recreation & Community Services Director; Josef Gottwald, Community Garden Coordinator; Francisco Morales, Parks & Facilities Attendant; and Scott Toepfer, Parks & Facilities Attendant.

3. Southern California Gas Company Hydrostatic Testing Operation Presentation.

PUBLIC INFORMATION REPORTS AND ANNOUNCEMENTS
This may include updates on law enforcement activity within the City from a Sheriff’s Office representative.

CITY MANAGER’S REPORT
The City Manager will report to the City Council regarding various City and/or community events and/or matters of interest. There will be no City Council discussion except to ask questions or refer matters to staff; and no action will be taken unless listed on a subsequent agenda or as otherwise specified below.
a. Senior Services Programming
b. City Employee Updates
c. Updates on Capital Improvement Projects
d. Updates on Development Applications
e. Other City/Community Updates
PLANNING COMMISSION ACTIONS: NONE
The City Council may vote to appeal a decision of the Planning Commission to itself by majority vote (CMC 14.78.040(2)).

PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA
This is a time for public comments on matters not otherwise on the agenda but within the subject matter jurisdiction of the City Council. The Mayor may establish reasonable regulations for public comment based on the time available and/or the number of persons City Council Regular Meeting Agenda
May 28, 2024

Page 4 ends

waiting to speak. Typically, the Council’s practice has been to limit each speaker to three minutes. The audio-visual system in the Council Chamber is not available for speaker use during the general Public Comment period.

The City and the City Council are not responsible for the content of statements made during the public comment period, or the factual accuracy of any such statements.

CONSENT CALENDAR: Items on the consent calendar are considered to be routine and are normally enacted by one unanimous vote of the Council. If you wish to speak on a consent calendar item please do so during the public comment period provided at the beginning of this item.

4. Approve the minutes of the regular meeting held May 13, 2024.

5. Receive and file the Expenditures for the period beginning May 6, 2024 and ending May 17, 2024.

6. Receive and file the Report of Contracts Executed by the City Manager for the Period of April 16, 2024 through May 20, 2024.

7. Receive and file the Monthly Treasurer’s Report on Compliance with Statement of Safekeeping and Investment of Public Funds for April 2024.

8. Adopt Ordinance No. 782, amending Chapter 2.37 of the Carpinteria Municipal Code to modify the composition of the Carpinteria Library Advisory Commission and align reporting requirements with State law. (Requires a roll call vote.) ADMINISTRATIVE MATTERS:

9. Resolutions calling the November 5, 2024 General Municipal Election and requesting the Santa Barbara County Board of Supervisors to consolidate said election with the Presidential General Election to be held the same day, and adopting regulations for Candidate Statements.

Recommendation: Adopt the attached two resolutions relating to the November 5, 2024 election: (1) Resolution No. 6317, calling for the holding of a General Municipal Election to be held on Tuesday, November 5, 2024 and requesting the Board of Supervisors of the County of Santa Barbara to consolidate said election with the Presidential General Election; and (2) Resolution No. 6318, adopting regulations for Candidates’ Statements.

Staff Presenter: Brian C. Barrett, City Clerk
a. Staff Report
b. Public Comment
City Council Regular Meeting Agenda
May 28, 2024

Page 5 ends

c. City Council Determination

10. Placement of a proposed measure to increase the rate of the City’s Transient Occupancy Tax from twelve percent (12%) to fifteen percent (15%) on the November 2024 ballot.

Recommendation: (1) Adopt Resolution No. 6320, ordering the submission to the qualified electors of the City of a certain measure relating to increasing the rate of the City’s Transient Occupancy Tax at the General Election to be held on Tuesday, November 5, 2024, as called by Resolution No. 6317; (2) Adopt Resolution No. 6321, requesting the Board of Supervisors of the County of Santa Barbara to consolidate a General Municipal Election to be held on November 5, 2024, with the Statewide General Election to be held on the date pursuant to § 10403 of the Elections Code; (3) Adopt Resolution No. 6322, setting priorities for filing written argument(s) regarding a City measure and directing the City Attorney to prepare an impartial analysis; and (4) Adopt Resolution No. 6323, providing for the filing of rebuttal arguments for City measures submitted at municipal elections. (Requires a two-thirds vote to pass.)
Staff Presenter: Olivia Uribe Mutal, Program Manager
a. Staff Report
b. Public Comment
c. City Council Determination
PUBLIC HEARING:

11. Introduction and first reading of Ordinance No. 781, an Ordinance of the City Council of the City of Carpinteria amending Carpinteria Municipal Code Chapter

5.40 to permit outdoor live entertainment. This ordinance would amend the definition of “place of entertainment” to include outdoor portions of premises open to the public.

Recommendation: Approve Ordinance No. 781, as read by title only (first reading). (Requires reading of ordinance title and a roll call vote.) Staff Presenter: Nick Bobroff, Community Development Director a. Staff Report
b. Public Comment
c. City Council Determination

12. Status Report on the City’s 2023-2031 Housing Element certification and approach to rezoning candidate sites under Program 1 (Adequate Sites to Accommodate Regional Housing Needs).

City Council Regular Meeting Agenda
May 28, 2024

Page 6 ends

Recommendation: Receive staff presentation and public testimony, and file status report.

Staff Presenter: Mindy Fogg, Principal Planner
a. Staff Report
b. Public Comment
c. City Council Determination

13. Resolution No. 6325, concerning the continuation of Street Lighting District No. 1 for Fiscal Year 2024-25.

Recommendation: Adopt Resolution No. 6325, concerning the continuation of Street Lighting District No. 1 for Fiscal Year 2024-25.

Staff Presenter: Stephon Downes, Management Analyst I
a. Staff Report
b. Public Comment
c. City Council Determination

14. Resolution No. 6326, concerning the continuation of Lighting, Landscaping and Right-of-Way Improvement District No. 3 for Fiscal Year 2024-25.

Recommendation: Adopt Resolution No. 6326, concerning the continuation of Lighting, Landscaping and Right-of-Way Improvement District No. 3 for Fiscal Year 2024-25.

Staff Presenter: Stephon Downes, Management Analyst I
a. Staff Report
b. Public Comment
c. City Council Determination

15. Resolution No. 6327, concerning the continuation of Parking and Business Improvement Area Assessment District No. 4 for Fiscal Year 2024-25.

Recommendation: Adopt Resolution No. 6327, concerning the continuation of the Parking and Business Improvement Area Assessment District No. 4 including establishing the annual general business assessment amount of $122.64 for Fiscal Year 2024-25.

Staff Presenter: Stephon Downes, Management Analyst I
a. Staff Report
b. Public Comment
City Council Regular Meeting Agenda
May 28, 2024

Page 7 ends

c. City Council Determination

16. Resolution No. 6328, concerning the continuation of Assessment District No. 5 for Fiscal Year 2024-25.

Recommendation: Adopt Resolution No. 6328, concerning the continuation of Assessment District No. 5 for Fiscal Year 2024-25.

Staff Presenter: Stephon Downes, Management Analyst I
a. Staff Report
b. Public Comment
c. City Council Determination

17. Ordinance No. 783, an Ordinance of the City Council of the City of Carpinteria, California, amending Chapter 2.04.620 of the Carpinteria Municipal Code to modify the compensation of the Carpinteria City Councilmembers pursuant to Government Code Section 36516.

Recommendation: Approve Ordinance No. 783, as read by title only, setting the new City Council compensation at the allowable amount per Senate Bill 329 (first reading). (Requires reading of ordinance title and a roll call vote.) Staff Presenter: Teresa Ilasin, Management Analyst II
a. Staff Report
b. Public Comment
c. City Council Determination

CONSIDERATION OF ANY ITEMS REMOVED FROM CONSENT CALENDAR AND/OR

OTHER AGENDA ITEMS REQUESTED TO BE ADVANCED
MATTERS CONTINUED FROM PREVIOUS MEETINGS: NONE
OTHER BUSINESS:

18. Law Enforcement Services Budget Considerations, including Community Resource Deputy Position and Summer Augmentation Patrol.

Recommendation: Receive report and provide direction to the City Manager regarding inclusion of Community Resource Deputy Position and Summer Augmentation Patrol in draft fiscal year 2024/2025 budget.

Staff Presenter: Olivia Uribe Mutal, Program Manager
City Council Regular Meeting Agenda
May 28, 2024

Page 8 ends

a. Staff Report
b. Public Comment
c. City Council Determination
LEGISLATIVE UPDATE: The City Council will discuss local, state and/or federal legislation under consideration and decide whether to direct staff to place a matter(s) on a future City Council agenda for consideration.

COMMITTEE REPORTS, INQUIRIES AND OTHER MATTERS PRESENTED BY

COUNCILMEMBERS
Informational reports from Councilmember representatives on the committees, commissions and organizations listed below. This is also an opportunity for Councilmembers to request information from staff or seek support from fellow Councilmembers for future agenda items.

1. Appointees to Other Government Agencies
a. Beach Erosion Authority for Clean Oceans and Nourishment (BEACON) (Solórzano/Alt. Clark)
b. California Joint Powers Insurance Authority (CJPIA) (Clark/Alt. Alarcon) c. Santa Barbara County Association of Governments (SBCAG)(Clark/Alt.

Nomura)
d. Santa Barbara County Air Pollution Control District (APCD)(Clark/Alt.

Nomura)
e. Central Coast Community Energy (3CE) (Nomura/Alt. Goleta) f. Santa Barbara Mosquito and Vector Management District (Joe Franken) g. Santa Barbara Metropolitan Transit District (Solórzano)

2. Regional Committees
a. Channel Counties Division, League of California Cities (Nomura/Alt. Alarcon) b. Santa Barbara Joint Affordable Housing Task Group (Alarcon & Solórzano) c. Santa Barbara County Elected Leaders Forum to Address Homelessness (Clark/Alt. Alarcon)
d. South Coast Youth Safety Partnership (Solórzano/Alt. Lee) e. Multijurisdictional Solid Waste Task Group (Lee/Alt. Alarcon)

3. Joint and Standing Committees
a. City Council/Economic Vitality Committee (Alarcon & Lee) b. City Council/Public Safety Committee (Clark & Nomura) c. City Council/School Board Committee (Lee and Alarcon) d. City Council/Utilities Committee (Lee & Nomura)
e. City Council/First District Supervisor Committee (Lee & Solórzano) City Council Regular Meeting Agenda
May 28, 2024

Page 9 ends

f. City Council Finance/Budget Committee (Alarcon & Clark) g. Transportation Committee (Lee & Clark)
h. Development Review Committee (Joint Committee membership from City Council, Planning Commission and Architectural Review Board) (CC: Clark & Nomura) (PC: To Be Selected by Planning Commission) (ARB: Stein & O’Connor)
i. General Plan and Coastal Plan Update Committee (Joint Committee membership from City Council and Planning Commission) (Lee & Clark) (PC:

Benefield and Salant)
j. Public Facility Site Acquisition/Development Committee (Clark & Nomura) k. City Council Boards, Commissions and Committees Review Committee (Clark & Nomura/ Alt. Lee)
l. Sustainability Committee (Nomura & Solórzano)

4. Ad Hoc Committees
a. Senior Services Planning Committee (Lee & Solórzano) b. Civic/Youth Engagement Committee (Lee & Nomura)
c. City Council Housing Element Committee (Clark & Nomura) d. Harbor Seal Advisory Committee (Solórzano & Alarcon) e. Appointment Process Committee (Alarcon & Clark)

5. Appointed Representatives to Area Boards & Committees a. Community Media Access Center (Gary Dobbins)
b. County Library Advisory Committee (Gail Marshall)

ATTENDANCE OF COUNCILMEMBERS FOR FUTURE MEETINGS

ADJOURNMENT
The next regular City Council meeting will be held June 10, 2024 at 5:30 p.m.

In compliance with the Americans with Disabilities Act, if you need assistance to participate in this meeting, please contact the City Clerk's Office at (805) 755-4403 or the California Relay Service at (866) 735-2929. Notification two business days prior to the meeting will enable the City to make reasonable arrangements for accessibility to this meeting.

Materials related to an agenda item submitted to the City Council after distribution of the agenda packet are available for public review at the City Clerk's Office, located at 5775 Carpinteria Avenue, Carpinteria, CA 93013 or by going to the City’s website at https://carpinteriaca.gov/city-hall/agendas-meetings/.

This agenda was posted on Thursday, May 23, 2024, in the City Clerk's Office, on the City Hall Public Notices Board, and on the Internet.

A PROCLAMATION OF THE CITY COUNCIL

OF THE CITY OF CARPINTERIA
CELEBRATING THE 160TH ANNIVERSARY
OF GIRLS INC.

WHEREAS, 2024 marks the 160th anniversary of Girls Inc., the longest-running girls leadership program; and
WHEREAS, Girls Inc. was founded in 1864 to serve girls and young women who were experiencing upheaval in the aftermath of the Civil War,· and WHEREAS, Girls Inc. now supports over 100,000 girls across the U.S. and Canada through advocacy efforts on systemic barriers that threaten their ability to succeed; and WHEREAS, Girls Inc. of Carpinteria is a vital part of our community because of its work to inspire the next generation of leaders; and
WHEREAS, Girls Inc. girls build the knowledge, skills, and confidence to push for positive change in their lives and their communities; and WHEREAS, Girls Inc. develops and provides evidence-based programming with positive and lasting effects for girls who participate; and
WHEREAS, Girls Inc. Carpinteria hosts programs to further challenge and inspire girls of Carpinteria; and
WHEREAS, Girls Inc. girls reported more positive attitudes and behaviors across three outcome areas: Healthy Living (Strong), Academic Engagement and Success (Smart), and Life Skills or Character Development (Bold); and
WHEREAS, Girls Inc. girls reported higher rates of in-school attendance and higher mathematics scores; and
WHEREAS, Girls Inc. promotes girl-led advocacy on issues including sexual health, safety, and autonomy; equitable access to education; civic engagement and voting rights; and mental health and wellness; and
WHEREAS, Girls Inc. has had a longstanding commitment to inspiring all girls to be strong, smart, and bold for 160 years.

NOW, THEREFORE, the City Council of the City of Carpinteria hereby congratulates Girls Inc. on the 160
th anniversary of its founding and thanks Girls Inc. for its work to inspire girls to be Strong, Smart, and Bold.

IN WITNESS THEREOF, the Mayor hereunto set their hand and caused the official seal of the City of Carpinteria, California, to be affixed this 28th day of May, 2024.

Al Clark, Mayor
City of Carpinteria
ATTEST:

Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
~ ' ~ .
. ,:__;_ .. ~;· ~-~,L~, .... i~.
--..,.. fyo ~ ·>,; E:- . .,~. l~
.. ~~.:;' ,u-•~l~ '.
~-- '-~
~.1· - -~t;tf
~~~. :., .,, . f;:_ II{ -:=
~
~
-,,':-"
:--::::
---~t ~ ~
~: .;it,,t~f-: :~ii:=~=:
. ~ ,!':;.;_
0'-.✓- .... .,. ,.~., .. ··";. ~~-:~
, t; -;- . ;. ; ' - ~ /-·
.... t t; ~ ... ' ~ ~ -- ~- -
Agenda Item No. 1
City of Carpinteria

COUNCIL AGENDA STAFF REPORT
May 28, 2024

ITEM FOR COUNCIL CONSIDERATION
Southern California Gas Company Hydrostatic Testing Operation.

STAFF RECOMMENDATION
Receive and file the presentation from Southern California Gas Company.

Sample Motion: I move to receive and file the presentation from Southern California Gas Company.

BACKGROUND/DISCUSSION
Southern California Gas Company (SoCalGas) is proposing to offer recycled water that would be from its hydrostatic testing operations of its natural gas facilities near Casitas Pass Road just north of Highway 101. Hydrostatic testing involves filling pipelines with water to ensure integrity and safety. The hydrostatic testing would produce water, and the water would be treated for reuse. For example, the treated water may be reused for irrigation and construction dust control purposes. SoCalGas’s hydrostatic testing water after treatment is permitted for discharge into the waters of the United States under the Statewide General Order for Discharges from Natural Gas Utility Construction, Operations and Maintenance Activities, Order No. 2017-0029 -DWQ, National Pollutant Discharge Elimination System No. CAG670001 (NPDES Permit), as issued by the State Water Resources Control Board. The NPDES Permit also allows for the discharge of treated water for reuse, and this is the reason for SoCalGas offering this recycled water to the City.

In February and April 2024, staff and SoCalGas met in order to discuss the proposed hydrostatic testing activities, especially for staff to ascertain more information about the potential of City properties for the recycled water. Based on the correspondence as well as site visits with SoCalGas, staff concurs with the following City parks as potential discharge locations for the recycled water as irrigation water:

Potential Discharge Location Discharge Schedule
Carpinteria Community Farm (Avocado Orchard) July 2024
El Carro Park August 2024
Southern California Gas Company Hydrostatic Testing Operation May 28, 2024

Page 2 ends

SoCalGas estimates 421,000 gallons (approximately 563 hundred-cubic feet) as the total amount of recycled water. Though the aforementioned City parks are identified as initial potential discharge locations, the recycled water may potentially be used as irrigation water for other City parks as well as City right-of-way (e.g. landscape medians, planters, and street trees) and the grounds of City properties (e.g. front yard landscape).

Staff estimates a potential, irrigation water consumption total savings of $17,200 should the entire said recycled water volume be used in said City parks alone. For comparison purposes, the total irrigation water consumption cost from said City parks is projected to be approximately $37,000 in Fiscal Year 2023-24.

The recycled water is proposed to be stored in temporary, portable aboveground water tanks or containers at said discharge locations and parked within City property and/or City right-of-way. SoCalGas submitted an Engineering Permit Application, as provided in Attachment A, that provides details of the proposed scope of work and work locations as well as a copy of a Best Management Practices and Control Strategy Plan.

SoCalGas’s Best Management Practices and Control Strategy Plan incorporates water quality best management practices that must meet the following objectives pursuant to the NPDES Permit:

1. Prevent toxicity to aquatic life from chlorine and other constituents in the discharge.

2. Prevent riparian erosion and hydromodification by implementing flow dissipation, erosion control, and hydromodification prevention measures where needed.

3. Minimize sediment discharge, turbidity, trash, and color impacts.

4. Prevent additional chemicals or other substances from being introduced into the discharge after treatment and/or control.

5. Prevent the addition of pollutants from non-permitted process waters or chemical spills.

The Best Management Practices and Control Strategy Plan is required to be developed and implemented in accordance with the NPDES Permit.

All expenses (labor, materials, and equipment) under the Engineering Permit including the water treatment and delivery as well as the temporary, portable aboveground water storage tanks or containers would be borne by SoCalGas. The irrigation would be controlled by the City albeit manual means and methods such as with the Public Works Department water trailer.

The purpose of this agenda matter is to receive and file the presentation from SoCalGas.

POLICY CONSISTENCY
The recommendation may be found consistent with following policies of the General Plan and Local Coastal Plan:

Southern California Gas Company Hydrostatic Testing Operation May 28, 2024

Page 3 ends

Open Space, Recreation and Conservation Element
Objective OSC-6: Preserve the natural environmental qualities of creekways and protect riparian habitat.

Policies:

OSC-6f. All development shall be evaluated for potential adverse impacts to water quality and shall consider Site Design, Source Control and Treatment Control BMPs in order to minimize polluted runoff and water quality impacts resulting from the development. In order to maximize the reduction of water quality impacts, BMPs should be incorporated into the project design in the following progression: (1) Site Design BMPs, (2) Source Control BMPs, and (3) Treatment Control BMPs.

Objective OSC-9. Encourage and promote open-field agriculture as an independent, viable industry to meet the needs of present and future populations and to preserve the Carpinteria Valley’s rural, open space character.

Policies:

OSC-9j. The City shall encourage agricultural practices that protect water quality, including but not limited to, reducing erosion, minimizing nutrient loss, reducing pesticide use and contamination, and irrigation management.

Public Facilities and Services Element
Objective PF-1: To ensure the provision of adequate water supplies by minimizing consumption and investigating new sources either in existing supply or outside existing sources.

Policies:

PF-1a. The City shall encourage reclamation and groundwater recharge programs (projects) where appropriate.

The recommendation is also consistent with the Statewide General Order for Discharges from Natural Gas Utility Construction, Operations and Maintenance Activities, Order No. 2017-0029 -DWQ, NPDES No. CAG670001.

FINANCIAL CONSIDERATIONS
No Funding Requested.

Southern California Gas Company Hydrostatic Testing Operation May 28, 2024

Page 4 ends

LEGAL AND RISK MANAGEMENT CONSIDERATIONS
The recommendation is consistent with the Statewide General Order for Discharges from Natural Gas Utility Construction, Operations and Maintenance Activities, Order No. 2017-0029 -DWQ, NPDES No. CAG670001.

PRINCIPAL PARTIES EXPECTED AT MEETING
Tim Mahoney, Southern California Gas Company

ATTACHMENTS
Attachment A: Engineering Permit Application
Staff contact:

John L. Ilasin, Public Works Director /s/
(805) 880-3402; [email protected] Signature
Reviewed by:

Ryan Kintz, Assistant City Manager /s/
(805) 755-4450; [email protected] Signature
Reviewed by:

Michael Ramirez, City Manager /s/
(805) 755-4400; [email protected] Signature

ATTACHMENT A
Engineering Permit Application
PERMIT NO. ____________
Last Edited: March 2022 Page 1 of 8
City of Carpinteria, California

PUBLIC WORKS DEPARTMENT
Engineering Permit Application
Select all boxes that apply to your project

GRADING EXCAVATION CONSTRUCTION
Type Type Type

ENCROACHMENT OTHER
Type Type
For Official City Use Only
Date of Permit Application
Date of Permit Issuance Date of Permit Expiration
List of Attachments

Required Bond Amount City Account Number
Engineering Deposit Fee
Applicant Information

Full Name
Mailing Address
Phone Alternate Phone
Contact Person Email
Location of Work
Project Duration
Approximate Value of Work Items Listed $
Water discharge to land Gary Sarley-Weng (SoCal Gas) 555 W5th St 17E2, Los Angeles 90013 323-528-6632 Gary Sarley-Weng [email protected] El Carro Park 1 week 100,000 PERMIT NO. ____________
Last Edited: March 2022 Page 2 of 8
Description of Work

Property Owner Information (If Applicable)
Full Name
Mailing Address
Phone Alternate Phone
Contact Person Email
Assessor’s Parcel No. (APN)
Contractor Information
ATTENTION: All work shall be performed by a Class A- General Engineering Contractor with the license issued by the Contractors State License Board and in good standing. The Contractor shall maintain insurance in conformance with the Insurance Specifications for Engineering Permit.

Same as Applicant
Business Name
Mailing Address
Phone Alternate Phone
Contact Person Email
License Type License No.

Bonding Company Bond Amount
Standard Conditions
The Permittee shall schedule a preconstruction conference with the City by calling (805) 684-5405 extension 445 at least two working days before the start of any work under this permit.

1. A copy of this permit shall be kept at the location of work at all times.

2. All work shall conform to the Standard Specifications for Public Works Construction latest edition, supplements, and errata thereto, written and promulgated by Public Works Standards, Inc., and additions and amendments by the City of Carpinteria. All work is subject to the Carpinteria Municipal Code.

3. All work shall be performed by a Class A- General Engineering Contractor with the license issued by the Contractors State License Board and in good standing.

SoCal Gas would like to work with Carpinteria Public Works to beneficially reuse 372,000 gallons of treated water by discharging at El Carro Park during the summer for landscape irrigation. Ecology Control Industries 15707 South Main St, Gardena, CA 90248 310-354-9999 Julio Cabrera General Engineering 741611 American Contractors Indemnity Co $25,000 PERMIT NO. ____________
Last Edited: March 2022 Page 3 of 8

4. The Permittee agrees to these Standard Conditions and special conditions incorporated herein permit.

Deviation from any condition will result in revocation of this permit, unless otherwise approved by the City.

5. The Permittee acknowledges that the fee and/or deposit set for this permit is an estimate only, and that if the City's cost exceeds the deposit, the Permittee shall make additional payments as necessary to maintain a positive account balance.

6. The Permittee shall defend, indemnify, and save harmless the City, its officers, agents and employees from any and all claims, demands, damages, costs, expenses including attorney’s fees, judgments or liabilities arising out of this permit or occasioned by the performance or attempted performance of the provisions hereof; including, but not limited to, any act or omission to act on the part of its agents or employees or other independent directly responsible to it; except those claims, demands, damages, costs, expenses including attorney's fees, judgments or liabilities resulting solely from the negligence or willful misconduct of the City.

7. The Permittee shall be responsible for providing convenience and safety to the public.

8. All improvements constructed under this permit shall be guaranteed for a period of one (1) year from the permit clearance date.

9. The work shall be inspected by the City. Any part of the work that is not inspected will be subject to removal at the expense of the Permittee.

10. Call 811 for Underground Service Alert of Southern California (Dig Alert) no less than two working days before the start of any excavation activities. This permit is not valid without a Dig Alert ticket.

11. The Permittee shall notify the Santa Barbara County Sheriff’s Department and the CarpinteriaSummerland Fire Protection District at least 24 hours before the start of hauling operations or road closures.

12. The Permittee shall be responsible for protecting all survey monuments in place and resetting of any disturbed monuments by a Licensed Land Surveyor or Registered Civil Engineer authorized to practice land surveying as required by state law.

13. Permit for excavation only grants permission to excavate at the location stated herein this permit.

Installation of or connection to underground utility facilities may require separate permits from the respective utility companies.

14. The Permittee shall immediately stop work in the event of discovering any archaeological resources and shall immediately notify the City. A qualified archaeologist, retained by the Permittee, will evaluate the situation and make recommendations to the City concerning the continuation of the work.

15. Issuance of this permit does not in any way constitute approval for work not related to this permit and/or work which requires issuance of a separate permit by other City departments, regulatory agencies, or utility companies before the start of such work.

16. The Permittee shall be responsible for protecting all existing improvements and shall restore, replace, or repair, at its own expense, any improvements damaged during the course of the work.

17. For earthwork operations including the grading, removal, replacement, placement, backfill, and compaction of soil materials shall be performed under the responsible charge of a Registered Geotechnical Engineer or Registered Civil Engineer qualified to practice geotechnical engineering as required by state law. A final soils engineering report of earthwork operations including tests and observations shall be submitted to the City prior to the issuance of a building permit.

18. Trenches and potholes shall be backfilled and compacted, and protected with steel covers before the end of the working day.

19. Construction activities that disturb one or more acres of land surface, or that are part of a common plan of development or sale that disturbs more than one acre of land surface shall comply with the NPDES PERMIT NO. ____________
Last Edited: March 2022 Page 4 of 8
General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009-DWQ; NPDES No. CA000002) as amended.

20. The Permittee shall be responsible for controlling surface water run-on to and run-off from the location of work. Control of surface water shall be such that existing drainage patterns are not disturbed or altered to increase the amount and/or intensity of surface water run-off to adjacent properties, public right-ofway, and storm drainage facilities.

21. Dust control shall be in accordance with the Santa Barbara Air Pollution Control District rules and regulations. Dust palliative shall be implemented appropriate for the location of work including traffic conditions and climate. All earthwork loads to be hauled shall be covered.

22. Working hours shall be between 7:00 a.m. and 5:00 p.m. Monday through Friday. Lane closures will only be permitted between 9 a.m. and 4 p.m. Monday through Friday and with an approved temporary traffic control plan and public noticing.

23. Prior to beginning the work, the Permittee shall deliver written notice to each potentially affected property including business, resident, or occupant, as determined by the City. The notice shall contain a brief description of the work, work dates, and contact information of the Permittee’s superintendent. The notice shall be delivered at ten (10) calendar days and again at two (2) working days prior to beginning the work. The notice shall be in the form of a door hanger made of index paper with the size of 14 inches by

4.5 inches. The notice shall be in English with translation in Spanish. If work does not occur on the work dates specified on the notice or if it is known that the work will not occur on the work dates specified, a revised notice shall be delivered as soon as the delay is known. The notice shall also be affixed to temporary No Parking signs.

24. Temporary No Parking signs shall be erected or placed at least twenty-four (24) hours prior to the effective time of such parking restriction.

25. Truck or haul route shall be approved by the City before the start of any hauling operations.

26. This permit shall expire and become null and void if the work authorized under such permit is not commenced within one hundred twenty (120) calendar days, completed within one year of the date of issue, or otherwise extended by the City.

27. Prior to final clearance of this permit, any outstanding City fees shall be paid in full. The Permittee continues to be responsible for all activity under this permit until final clearance of this permit.

28. The City reserves the right to revoke this permit without cause and at any time. Upon written revocation of this permit by the City, the Permittee shall promptly restore the location of work as determined by the City.

29. If the Permittee fails to perform the work to fulfill the permit, the City will perform the work at the expense of the Permittee.

30. The Permittee shall notify the City when work is completed. This permit is not completed until final clearance and all outstanding City fees are paid in full.

Applicant as PERMITTEE:

Signature Date
3/4/24
PERMIT NO. ____________
Last Edited: March 2022 Page 5 of 8
For Official City Use Only
Issued By:

Public Works Director/City Engineer Date
Final Clearance By:

Inspector Date
PERMIT NO. ____________
Last Edited: March 2022 Page 6 of 8

INSURANCE SPECIFICATIONS FOR ENGINEERING PERMIT
Prior to the beginning of and throughout the duration of the Work, Contractor shall maintain insurance in conformance with the requirements set forth below. Contractor shall use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth here, it shall be amended to do so. Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to City in excess of the limits and coverage required in this permit and which is applicable to a given loss, shall be available to City.

Contractor shall provide the following types and amounts of insurance:

1. Commercial General Liability Insurance using Insurance Services Office “Commercial General Liability” policy form CG 00 01 or the exact equivalent. Defense costs must be paid in addition to limits. There shall be no cross liability exclusion for claims or suits by one insured against another. Limits shall be no less than $1,000,000 per occurrence for all covered losses and no less than $5,000,000 general aggregate.

Contractor’s policy shall contain no endorsements limiting coverage beyond the basic policy coverage grant for any of the following:
• Explosion, collapse or underground hazard (XCU)
• Products and completed operations
• Pollution liability
• Contractual liability
Coverage shall be applicable to City for injury to employees of contractors, subcontractors or others involved in the Project. Policy shall be endorsed to provide a separate limit applicable to this project.

2. Workers Compensation on a state-approved policy form providing statutory benefits as required by law with employer’s liability limits no less than $1,000,000 per accident for all covered losses.

3. Business Auto Coverage on ISO Business Auto Coverage form CA 00 01 06 92 including symbol 1 (Any Auto) or the exact equivalent. Limits shall be no less than $1,000,000 per accident, combined single limit. If Contractor owns no vehicles, this requirement may be satisfied by a non-owned auto endorsement to the general liability policy described above. If Contractor or Contractor’s employees will use personal autos in any way on this project, Contractor shall provide evidence of personal auto liability coverage for each such person.

4. Excess or Umbrella Liability Insurance (Over Primary) if used to meet limit requirements, shall provide coverage at least as broad as specified for the underlying coverages. Any such coverage provided under an umbrella liability policy shall include a drop down provision providing primary coverage above a maximum $25,000 self-insured retention for liability not covered by primary but covered by the umbrella. Coverage shall be provided on a “pay on behalf” basis, with defense costs payable in addition to policy limits. There shall be no cross liability exclusion precluding coverage for claims or suits by one insured against another. Coverage shall be applicable to City for injury to employees of Contractor, subcontractors or others involved in the Work. The scope of coverage provided is subject to approval of City following receipt of proof of insurance as required herein. Limits are subject to review but in no event less than $1,000,000 per occurrence and aggregate.

5. Course of Construction insurance shall provide “all risk” coverage for the completed value of the Project. Policies shall contain the following provisions: (1) City shall be named as loss payee; and (2) the insurer shall waive all rights of recovery against the City. This insurance shall include coverage, but not by way of limitation, for all damage or loss to the Work and to appurtenances, to materials and equipment to be used on the Project while the same are in transit, stored on or off the Project site, to construction plant and temporary structures. The policy shall provide the Owner the right to utilize the facilities without termination of the policy until acceptance of the Project.

Such insurance may have a deductible clause not to exceed the below listed limits:
• Coverage for “Acts of God” in excess of five percent (5%) of Contract amount as defined in Sections 4150 and 4151 of the Government Code is subject to separate coverage if Bid Items for Act of God insurance are awarded. • Flood and earthquake deductible shall not exceed five percent (5%) of the value at risk at the time of risk. • All other perils: $5,000.

Contractor and City agree as follows:

PERMIT NO. ____________
Last Edited: March 2022 Page 7 of 8

1. Contractor agrees to endorse the third party general liability coverage required herein to include as additional insureds City, its elected officials, employees, agents, consultants and volunteers using standard ISO endorsement No. CG 2010 with an edition date of 1985. Contractor also agrees to require all contractors, subcontractors, and any one else involved in any way with the Project contemplated by this Permit to comply with these provisions.

2. Any waiver of subrogation express or implied on the part of City to any party involved in this Permit, the Contract Documents or related documents applies only to the extent of insurance proceeds actually paid. City, having required that it be named as an additional insured to all insurance coverage required herein, expressly retains the right to subrogate against any parts for sums not paid by insurance. For its part, Contractor agrees to waive subrogation rights against City regardless of the applicability of any insurance proceeds, and to require all contractors, subcontractors or others involved in any way with the project(s) contemplated by this Permit, to do likewise.

3. All insurance coverage maintained or procured by Contractor or required of others by Contractor pursuant to this Permit shall be endorsed to delete the subrogation condition as to City, or to specifically allow Contractor or others providing insurance herein to waive subrogation prior to a loss. This endorsement shall be obtained regardless of existing policy wording that may appear to allow such waivers.

4. Insurance provided pursuant to these requirements is not intended by any party to be limited to providing coverage for the vicarious liability of City, or to the supervisory role, if any, of City. All insurance coverage provided pursuant to this or any other agreement (express or implied) in any way relating to City is intended to apply to the full extent of the policies involved. Nothing referred to here or contained in any agreement involving City in relation to the Project contemplated by this Permit is intended to be construed to limit the application of insurance coverage in any way.

5. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of this kind that has not been first submitted to City and approved of in writing.

6. All coverage types and limits required are subject to approval, modification and additional requirements by the City, as the need arises. Contractor shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) which may affect City’s protection without City’s prior written consent.

7. Proof of compliance with these insurance requirements, consisting of binders of coverage, or endorsements, or certificates of insurance, unless waived by the City, shall be delivered to City at or prior to the execution of this Permit. The Contractor shall, upon demand of the City, deliver to the City certified copies of such policy or policies of insurance and the receipts for payment of premiums. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled at any time and no replacement coverage is provided, City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other agreement and to pay the premium. Any premium so paid by City shall be charged to and promptly paid by Contractor or deducted from sums due Contractor, at City option.

8. Contractor agrees to endorse, and to require others to endorse, the insurance provided pursuant to these requirements, to require 30 days notice to City and the appropriate tender prior to cancellation of such liability coverage and notice of any material alteration, non-renewal or reduction in coverage limits of any such coverage, and to require contractors, subcontractors and any other party in any way involved with the project contemplated by this Permit to do likewise.

9. It is acknowledged by the parties of this Permit that all insurance coverage required to be provided by Contractor or any subcontractor, is intended to apply first and on a primary non-contributing basis in relation to any other insurance or self insurance available to City.

10. Contractor agrees to ensure that subcontractors, and any other party involved with the project who is brought onto or involved in the Project by contractor, provide the same minimum insurance coverage required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with subcontractors and other engaged in the Project shall be submitted to the City for review.

11. Contractor agrees that all layers of third party liability coverage required herein, primary, umbrella and excess, shall have the same starting and expiration date. Contractor agrees further that all other third party coverages required herein shall likewise have concurrent starting and ending dates.

12. Contractor agrees not to self-insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein and further agrees that it shall not allow any contractor, subcontractor, Architect, Engineer or other entity or person in any way involved in the performance of work on the project contemplated by this Permit to self-insure its obligations to City. If contractor’s existing coverage includes a deductible or self-insured retention, the deductible or selfinsured retention must be declared to the City. At that time the City shall review options with the Contractor, which may include reduction or elimination of the deductible or self-inured retention, substitution of other coverage, or other solutions.

PERMIT NO. ____________
Last Edited: March 2022 Page 8 of 8

13. City reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City will negotiate additional compensation proportional to the increased benefit to City.

14. For purposes of applying insurance coverage only, all contracts pertaining to the Project will be deemed to be executed when finalized and any activity commences in furtherance of performance under this Permit.

15. Contractor acknowledges and agrees that any actual or alleged failure on the part of City to inform Contractor of noncompliance with any insurance requirement in no way imposes any additional obligations on City nor does it waive any rights hereunder in this or any other regard.

16. Contractor shall renew the required coverage annually as long as City, or its employees or agents face an exposure from operations of any type pursuant to this Permit. This obligation applies whether or not the agreement is canceled or terminated for any reason. The insurance shall include but not be limited to products and completed operations and discontinued operations, where applicable. Termination of this obligation is not effective until City executes a written statement to that effect.

17. Contractor agrees to waive its statutory immunity under any workers’ compensation statute or similar statute, in relation to the City, and to require all subcontractors and any other person or entity involved in the Project contemplated by this Permit to do likewise.

18. Requirements of specific coverage features are not intended as limitations on other requirements or as a waiver of any coverage normally provided by any given policy. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be all-inclusive.

19. Any provision in any of the construction documents dealing with the insurance coverage provided pursuant to these requirements, is subordinate to and superseded by the requirements contained herein. These insurance requirements are intended to be separate and distinct from any other provision in this Permit and are intended by the parties here to be interpreted as such.

20. All liability coverage provided according to these requirements must be endorsed to provide a separate aggregate limit for the Project that is the subject of this Permit and evidencing products and completed operations coverage for not less than two (2) years after issuance of a final certificate of occupancy by all appropriate government agencies or acceptance of the completed work by City.

21. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the Project reserves the right to charge City or Contractor for the cost additional insurance coverage required by this Permit. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto.

22. Insurance procured pursuant to these requirements shall be written by insurers that are admitted carriers in the State of California and with an A.M. Best rating of A- or better and a minimum financial size of VII.

23. Any policy of insurance procured pursuant to these requirements shall be an “occurrences” policy.

24. The above insurance coverage shall not limit the indemnification obligations of Contractor as provided in the Contract Documents and the failure to maintain the required coverages shall constitute a material breach of this Permit.

Southern California Gas Company
Best Management Practices and
Control Strategy Plan
July 11, 2018
SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 i
Contents
Section Page
Contents............................................................................................................................................... i Tables………….. .................................................................................................................................... iii Definitions.......................................................................................................................................... iv Acronyms and Abbreviations .............................................................................................................viii

1.0 Applicability ............................................................................................................................ 1

2.0 Performance Measures and Objectives.................................................................................... 1

3.0 Plan Maintenance and Availability........................................................................................... 1

4.0 Overview of Discharges ........................................................................................................... 1

4.1 Discharge Management Methods ...................................................................................... 2

4.2 State Water Board Recommendations............................................................................... 2

5.0 Discharge Planning .................................................................................................................. 2

5.1 Project Water Management Strategy, Data, and Resource Needs .................................... 3 Discharge Options for Dewatering and Hydrostatic Test Water ........................... 3 Hydrostatic Testing Water Source ......................................................................... 3 Onsite Water Management................................................................................... 3 Biological Resources .............................................................................................. 3 Cultural Resources................................................................................................. 4 Hydrogeological Considerations Near Hazardous Waste Release Sites................ 4

5.2 Characterize Discharge Quantity and Quality..................................................................... 4 Groundwater Dewatering Operations................................................................... 4 Hydrostatic Testing Operations............................................................................. 5

5.3 Pre-Discharge Notifications ................................................................................................ 5

6.0 Best Management Practices..................................................................................................... 6

6.1 Generally Applicable Best Management Practices............................................................. 6

6.2 Best Management Practices Applicable to Water Storage, Treatment, and Discharge..... 6 Training .................................................................................................................. 6 Spill Prevention...................................................................................................... 6 Segregation of Test Water, Groundwater, and Process Solutions ........................ 7 Land Discharge Best Management Practices......................................................... 7 Best Management Practices for Discharges to Percolation, Infiltration, or Evaporation Ponds................................................................................................. 8 Prevention of Erosion and Hydromodification from Surface Water Discharges... 8 Cultural Resource Avoidance and Minimization Measures................................... 8 Confidentiality of Cultural Resource Information.................................................. 9

7.0 Land Discharge Control Strategy .............................................................................................. 9

7.1 Effluent Limits and Narrative Standards............................................................................. 9

7.2 Dewatering Discharge Control Strategy ........................................................................... 10

7.3 New Pipe Hydrostatic Test Water Control Strategy ......................................................... 10

7.4 Existing Pipe Hydrostatic Test Water Control Strategy .................................................... 10 Existing Pipe Hydrostatic Test Water Discharge Characteristics ......................... 10 SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 ii
Pipeline Segment Rinsing..................................................................................... 10 Control Strategy for Pollutants............................................................................ 11

7.5 Additional Control Provisions ........................................................................................... 11 Provisions for Water Treatment Service Contractors.......................................... 11 Indicators of Noncompliance............................................................................... 11

8.0 Surface Water Discharge Control Strategy ............................................................................. 12

8.1 Effluent and Receiving Water Limitations, and Receiving Water Monitoring.................. 12 Numerical Effluent Limitations............................................................................ 12 Receiving Water Limitations................................................................................ 13

8.2 Dewatering Discharge Control Strategy ........................................................................... 14 Control Strategy for Pollutants............................................................................ 14

8.3 New Pipe Hydrostatic Test Water Control Strategy ......................................................... 14 Control Strategy for Pollutants............................................................................ 15

8.4 Existing Pipe Hydrostatic Test Water Control Strategy .................................................... 15 Existing Pipe Hydrostatic Test Water Discharge Characteristics......................... 15 Pipeline Segment Rinsing..................................................................................... 15 Control Strategy for Pollutants............................................................................ 15

8.5 Additional Control Provisions ........................................................................................... 16 Provisions for Water Treatment Service Contractors.......................................... 16 Indicators of Noncompliance............................................................................... 17

9.0 Unplanned, Emergency, and Noncompliant Discharge Control Strategy................................. 17

9.1 Unplanned Discharges...................................................................................................... 17 Unplanned Discharge Definition.......................................................................... 17 Requirement to Implement Appropriate Best Management Practices and Controls for Unplanned Discharges..................................................................... 17 Monitoring ........................................................................................................... 17 Notification .......................................................................................................... 17

9.2 Emergency Discharges...................................................................................................... 18 Emergency Discharge Definition.......................................................................... 18 Requirement to Implement Appropriate Best Management Practices and Controls for Unplanned and Emergency Discharges........................................... 18 Monitoring ........................................................................................................... 18 Notification .......................................................................................................... 18 Documentation of Emergency Discharge Response............................................ 19 Reporting of Emergency Discharge...................................................................... 19

9.3 Noncompliant Discharges................................................................................................. 20 Noncompliant Discharge Definition..................................................................... 20 Receiving Water Monitoring................................................................................ 20 Notification .......................................................................................................... 20 Documentation Discharge Response................................................................... 20 Reporting ............................................................................................................. 21 Appendix 1: SCG Best Management Practice and Control Strategy Plan Review and Amendment Log ..............................................................................................................................Appendix 1-1 Appendix 2: Discharge Reporting Form ..............................................................................Appendix 2-1 Appendix 3: Final Effluent Limitations for Planned Discharges to Surface Waters...............Appendix 3-1 SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 iii
Tables
Table 6-1. Cultural Resource Avoidance and Minimization Measures.........................................................8 Table 7-1. Compliance Monitoring for Land Discharges...............................................................................9 Table 7-2. Control Strategy for Pollutants ..................................................................................................11 Table 8-1. Compliance Monitoring for Surface Water Discharges .............................................................13 Table 8-2. Control Strategy for Pollutants ..................................................................................................15 SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 iv
Definitions
Adverse Effect or Adverse Impact to Beneficial Uses
A detrimental effect to one or more beneficial uses of a surface or groundwater body caused by the discharge.

Area of Special Biological Significance
An ocean area designated by the State Water Resources Control Board (SWRCB) as requiring protection of species or biological communities to the extent that maintenance of natural ocean water quality is ensured. All Areas of Special Biological Significance are also classified as a subset of State Water Quality Protection Areas. Areas of Special Biological Significance are also referred to as State Water Quality Protection Areas – Areas of Special Biological Significance.

Authorized Discharge
Any discharge that is authorized pursuant to this General Order from the date of issuance of a Notice of Applicability to the Discharger by the State Water Board.

Basin Plan
The Water Quality Control Plan adopted by a Regional Water Quality Control Board (RWQCB)). A Basin Plan designates the beneficial uses of the waters within the Regional Water Board boundaries, establishes water quality objectives for these waters, and contains implementation programs and policies to achieve water quality objectives for all waters in the Regional Water Board boundary.

Beneficial Uses
Existing or potential uses of waters within the boundary of a Regional Water Board as designated in the Regional Water Board’s Basin Plan.

Best Management Practices
Methods, measures, or practices designed and selected to reduce or eliminate the discharge of pollutants to water of the United States, non-federal surface water, or groundwater. Best management practices include structural and nonstructural controls, and operations and maintenance procedures, which can be implemented prior, during and/or after discharge producing activities.

Chlorinated Water
Water that was dosed with chlorine to adequately sanitize and disinfect the water.

Discharge
Effluent that has received best management practices and/or best practicable treatment or control prior to entering receiving water.

Discharge to Land
A discharge to land that does not runoff into a surface water and/or to a conveyance to a surface water, and will possibly discharge to groundwater.

Effluent
Wastewater exiting natural gas facilities prior to entering best management practices and/or best practicable treatment or control measures.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 v
Emergency Discharge
An unplanned discharge due to a sudden unexpected occurrence involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services, including the provision of natural gas supplies. Emergency discharges include, but are not limited to, discharges from emergency natural gas facility failure and repair and ruptures during hydrostatic testing.

Enclosed Bays
Indentations along the coast that enclose an area of oceanic water within distinct headlands or harbor works. Enclosed bays include all bays where the narrowest distance between the headlands or outermost harbor works is less than 75 percent of the greatest dimension of the enclosed portion of the bay. Enclosed bays include, but are not limited to, Humboldt Bay, Bodega Harbor, Tomales Bay, Drake’s Estero, San Francisco Bay, Morro Bay, Los Angeles-Long Beach Harbor, Upper and Lower Newport Bay, Mission Bay, and San Diego Bay. Enclosed bays do not include inland surface waters or ocean waters.

Estuaries
Surface waters, including coastal lagoons, located at the mouths of streams that serve as areas of mixing for fresh and ocean waters. Coastal lagoons and mouths of streams that are temporarily separated from the ocean by sandbars shall be considered estuaries. Estuarine waters shall be considered to extend from a bay or the open ocean to a point upstream where there is no significant mixing of fresh water and seawater. Estuaries do not include inland surface waters or ocean waters.

Hydrostatic Pressure Testing
Hydrostatic testing typically consists of filling segments of new or existing pipeline with water, pressurizing the water within the pipeline, and checking to confirm the pressure is maintained.

Impaired Water Body
A water body segment that is listed on the most recent U.S. Environmental Protection Agency-approved Clean Water Act section 303(d) list of impaired water bodies.

Indirect Discharge
Any discharge that enters a water of the U.S. by first traveling via a storm drain or any other constructed conveyance system.

Inland Surface Waters
All waters of the U.S. that do not include the ocean, enclosed bays, or estuaries.

Method Detection Limit
Minimum concentration of a substance that can be measured and reported with 99 percent confidence that the analyte concentration is greater than zero, as defined in 40 C.F.R. part 136, Attachment B, revised as of July 3, 1999.

Minimum Level and Reporting Level
The concentration at which the entire analytical system gives a recognizable signal and acceptable calibration point. The minimum level is the concentration in a sample that is equivalent to the concentration of the lowest calibration standard analyzed by a specific analytical procedure, assuming that all the method specified sample weights, volumes, and processing steps have been followed. A reporting level is the minimum level for reporting and compliance determination included in this General Order.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 vi
Municipal Separate Storm Sewer System Operator
The entity responsible for the operation of a local municipal separate storm sewer system.

National Pollutant Discharge Elimination System
The national program for issuing, modifying, revoking and reissuing, terminating, monitoring and enforcing permits, and imposing and enforcing pretreatment requirements, under Clean Water Act sections 307, 402, 318, and 405.

Natural Gas Facilities
Pipelines and piping systems, compressor stations, valves and manifolds, metering equipment, and other appurtenances constructed and operated for the purpose of transmission and distribution of natural gas.

Non-Federal Surface Waters
Non-federal surface waters means surface water or groundwater, including saline waters, within the boundaries of the state that are not waters of the United States. Discharge to certain waters of the state (e.g., wetlands or vernal pools) are prohibited in the General Order.

Noncompliant Discharge
The State and Regional Water Boards deem discharges out of compliance with effluent limitations when a pollutant concentration in the monitoring sample is greater than or equal to the corresponding effluent limitation and greater than or equal to the Reporting Limit for the pollutant.

Not Detected
Sample results less than the properly calibrated monitoring equipment’s method detection limit.

Nuisance
Anything which meets one of the following:

1. Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property;

2. Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal; or

3. Occurs during, or as a result of, the treatment or disposal of wastes.

Ocean Waters
Territorial marine waters of the state as defined by California law to the extent these waters are outside of enclosed bays, estuaries, and coastal lagoons. Discharges to ocean waters are regulated in accordance with the California Ocean Plan.

Planned Discharge
Discharges due to scheduled dewatering and hydrostatic testing of new and/or existing natural gas facilities related to excavation, construction, testing, operations, maintenance and repair.

Priority Pollutants
Substances defined in Clean Water Act section 502(6) (33 U.S.C. § 1362(6)), and incorporated by reference into California Water Code section 13373.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 vii
Qualified Biologist
A person is deemed a qualified biologist based upon academic training, experience, and knowledge can provide an evaluation of the issue being considered. Qualified biologists should not work outside their particular field of expertise.

Recycled Water
Water which, as a result of treatment of waste, is suitable for a direct beneficial use or a controlled use that would not otherwise occur and is therefore considered a valuable water supply resource.

Site Dewatering
Removal of groundwater and other water such as rainwater, local runoff and/or water from water pipeline breaks that collect in excavations (including trenches).

Unplanned Discharge
Discharges due to dewatering resulting from water pipe ruptures, groundwater seepage, collection of rain water, incidental storm water inflow, local run-on, or urgent operations, maintenance and/or repair activities.

Waters of the State
Any surface water or groundwater, including saline waters, within the boundaries of the state. Waters of the state includes waters of the United States.

Waters of the United States
Generally refers to surface waters, as defined for the purposes of the Federal Clean Water Act. Waters of the United States are distinguished from non-federal waters of the state by certain characteristics.

Discharges of pollutants to waters of the United States are regulated by the Clean Water Act.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 viii
Acronyms and Abbreviations
AMM avoidance and minimization measure
BMP best management practice
CGP California Stormwater Construction General Permit
CNDDB California Natural Diversity Data Base
EPA U.S. Environmental Protection Agency
FER Field Environmental Representative
GAC granular activated carbon
gpm gallon(s) per minute
MCL maximum contaminant limit
mg/L milligram(s) per liter
MS4 Municipal Separate Storm Sewer System
PCB polychlorinated biphenyl
Permit Statewide General Order for Discharges from Natural Gas Utility Construction, Operations and Maintenance Activities Order 2017-0029-DWQ, NPDES No.

CAG670001
BMP Plan Southern California Gas Company Best Management Practices and Control Strategy Plan
PM Project Manager
NOA Notice of Applicability
NOI Notice of Intent
NPDES National Pollutant Discharge Elimination System
NTU Nephelometric Turbidity Units
RWQCB Regional Water Quality Control Board
SCG Southern California Gas Company
BMP Manual Southern California Gas Company Best Management Practice Manual for Water Quality and Storm Water Management
SME Subject Matter Expert
SWPPP Stormwater Pollution Prevention Plan
SWRCB State Water Resources Control Board
µg/L micrograms per liter
WDID Waste Discharge Identification Number
SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 1 1.0Applicability
Southern California Gas Company (SCG) has prepared this Best Management Practices and Control Strategy Plan (BMP Plan) for discharges of wastewater performed under SCG’s authorization under State Water Resources Control Board (SWRCB) Statewide General Order for Discharges from Natural Gas Utility Construction, Operations and Maintenance Activities, Order No. 2017-0029 -DWQ, NPDES No.

CAG670001 (Permit).

SCG submitted a Notice of Intent (NOI) on May 15, 2018 and received a Notice of Applicability (NOA) on July 11, 2018 authorizing coverage under the Permit. The SWRCB assigned SCG with Waste Discharge Identification Number (WDID) NGU003.

This Plan addresses planned, unplanned and emergency discharges from natural gas utility construction projects, as described in the Permit, to land, to waters of the United States, and to non-federal surface waters, where the concentrations of pollutants in the effluent have a reasonable potential to exceed applicable water quality criteria or objectives.

Direct discharge to groundwater (e.g., injection wells and well cellars) and vault dewatering, is not authorized by the Permit nor addressed in this Plan. For procedures for vault dewatering see Gas Standard 104.077.

2.0Performance Measures and Objectives
This Plan was developed in accordance with section IX.A.5 of the Permit and has the following objectives:
• Prevent toxicity to aquatic life from chlorine and other constituents in the discharge; • Prevent riparian erosion and hydromodification by implementing flow dissipation, erosion control, and hydromodification-prevention measures where needed; • Minimize sediment discharge, turbidity, trash, and color impacts; • Prevent additional chemicals or other substances from being introduced into the discharge after treatment and/or control; and
• Prevent the addition of pollutants from non-permitted process waters or chemical spills.

3.0Plan Maintenance and Availability
This BMP Plan will be reviewed and updated annually, as outlined in section IX.A.5 of the Permit.

Appendix 1 presents the Plan revision history including dates of annual reviews and summary of corresponding Plan revisions.

SCG will maintain an electronic or hardcopy of the most-updated Plan at the facility project site. SCG will make this BMP Plan available to SWRCB or Regional Water Quality Control Board (RWQCB) staff during an inspection or upon request.

4.0Overview of Discharges
The Permit authorizes planned, emergency, and unplanned discharges from the following activities:
• Hydrostatic testing of existing natural gas facilities; • Hydrostatic testing of new natural gas facilities; and SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 2 • Site dewatering related to excavation, construction, testing, maintenance and/or repair of natural gas facilities.

The Permit defines planned, emergency, and unplanned discharges as follows:
• Planned Discharges: Discharges due to scheduled dewatering and hydrostatic testing of new and/or existing natural gas facilities related to excavation, construction, testing, maintenance, operation and/or repair;
• Emergency Discharges: Discharges due to a sudden, unexpected occurrence involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services, including the provision of natural gas supplies; and
• Unplanned Discharges: Discharges due to dewatering resulting from water pipe ruptures, groundwater seepage, collection of rain water, incidental storm water inflow, local run-on, or urgent operations, maintenance and/or repair activities.

See section 9 of this BMP Plan for more information regarding emergency and unplanned discharges.

4.1 Discharge Management Methods
Discharge management methods allowed by the Permit include the following:
• Discharge to land, including beneficial reuse (e.g., dust control and compaction); and • Discharge to surface water, including both waters of the United States and non-federal surface waters.

4.2 State Water Board Recommendations
The SWRCB encourages SCG to prioritize discharges to land over discharges to surface waters to the extent practicable based on project conditions. Additionally, for projects where land discharge is a feasible option, a designated responsible person at SCG will evaluate the use of recycled water during hydrostatic testing of new or existing pipe, to the extent practicable, based on supply availability and access and suitability for its intended use.

5.0Discharge Planning
Discharge planning is coordinated by the Project Manager (PM). The PM works with the Water Quality Subject Matter Expert (Water Quality SME), Cultural Resource SME, Field Environmental Representative (FER), construction contractor, and other designated responsible persons to complete the following:
• Establish project water management strategy, including but not limited to the following:
o Identify data needed to implement the strategy; and
o Identify and coordinate resources needed to implement the strategy. • Characterize discharge quantity and quality, coordinate water treatment requirements; and • Prepare and submit Pre-Discharge Notifications to the appropriate RWQCB, Tribal Entities, and municipal separate sewer and storm system (MS4) owner or operator when required by the Permit.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 3 5.1 Project Water Management Strategy,Data, and Resource Needs The SCG team listed above will establish a water management strategy and identify the data and resources needed to support the discharge strategy. Project plans are developed that identify the scope and extent of the project and serve as the basis for identifying water management and discharge requirements. Data and resource needs addressed in the water management strategy are identified below.

Discharge Options for Dewatering and Hydrostatic Test Water Discharge options for dewatering and hydrostatic test are as follows:
• Beneficial reuse- Potential beneficial reuse options include, but are not limited to, dust suppression and backfill compaction;
• Discharge to land;
• Discharge to surface waters; and
• If the water does not meet Permit conditions, it will be transported to an approved disposal facility or appropriately permitted commercial treatment facility.

Hydrostatic Testing Water Source
Potential water sources are located and identified. If non-potable water is used for hydrostatic testing, it must meet SCG company requirements as identified in Gas Standard 106.0232, Field Sampling and Analysis of Liquids and Solids/Sludge, Section 5.5.

If recycled water is sampled and meets all company requirements, it may be used provided the project location is within the recycled water supplier’s designated use area. The use of recycled water should also be covered under the supplier’s recycled water engineering report. If recycled water will be used, SCG’s designated responsible person will work with the supplier to identify and comply with recycled water use requirements in Title 22.

Recycled water discharged to land must comply with the appropriate setback distances listed in section IX.G of the Permit.

Onsite Water Management
When water must be kept onsite temporarily, before final disposal, an adequate staging area must be secured in order to accommodate water containment and treatment systems, if needed. A sufficient number of holding tanks must be used in order to segregate water and other liquids from each stage of the hydrostatic test or dewatering operation. The PM shall work with project team to determine the total number of holding tanks required for fill/dewatering, cleaning slug, and treated water to evaluate whether there is sufficient room onsite to accommodate this storage volume. If space is not available onsite, the PM will locate excess storage capacity offsite and truck or hard-pipe the test water to the discharge location.

Biological Resources
For direct discharges to surface waters and land, if necessary, input from a qualified biologist1 will confirm that the proposed discharge location is not a wetland or vernal pool. Discharges to federal and non-federal wetlands and/or vernal pools are prohibited by the Permit. The Permit defines wetlands and vernal pools as follows:

1 A qualified biologist is defined in the Permit as one that based upon academic training, experience, and knowledge can provide an evaluation of the issue being considered. Qualified biologists should not work outside their particular field of expertise.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 4 • “An area is a wetland if, under normal circumstances, (1) the area has continuous or recurrent saturation of the upper substrate caused by groundwater or shallow surface water or both; (2) the duration of such saturation is sufficient to cause anaerobic conditions in the upper substrate; and (3) the area either lacks vegetation or the vegetation is dominated by hydrophytes.”
• Vernal pools are “Seasonal depressional wetlands that occur in Mediterranean climate conditions. They are covered by shallow water for variable periods from winter to spring, but may be completely dry for most of the summer and fall.” If discharges are to occur in sensitive areas and the discharge will result in saturated surface soils or otherwise impact species that reside in subterranean burrows, an environmental review will be conducted before the discharge is initiated. See section 6.2.3 of this BMP Plan for more information.

Cultural Resources
SCG performs an environmental review as part of project planning and includes potential for cultural resource impacts. As part of the environmental review, SCG Cultural Resource SME will identify the project locations and discharges, if any, that are subject to the 30-day Notifications to Tribal Entities, whom elected to opt in to the State Water Board Native American Tribe Pre-Discharge Notification List, as specified in the Permit.

Hydrogeological Considerations Near Hazardous Waste Release Sites When groundwater dewatering will occur, SCG will conduct an environmental project review to identify the presence of any nearby hazardous materials sites. If groundwater dewatering will occur within 250 feet of a hazardous material release site, or a chemical plume2 emanating from a hazardous material release site; a hydrogeologic evaluation will be conducted to determine if the dewatering activities will significantly affect conditions at the release site. These significant effects include: causing loss of hydraulic control of a plume under remediation, lowering the groundwater table when floating nonaqueous phase liquid (e.g., gasoline) is present, or migration of an existing plume. SCG will make the determination of the presence of hazardous material release sites using the SWRCB’s GeoTracker system, available at: geotracker.waterboards.ca.gov.

When a hydrogeologic evaluation is required, consultation with the SWRCB and/or RWQCB is required.

Additional analysis of dewatering activities, testing, and treatment of extracted groundwater may be required.

Dewatering an excavation to remove storm water that has flowed into the excavation via the surface, or to remove water that resulted from a broken pipe (potable water, sewage, recycled water, or storm drain) is exempt from the consultation with the SWRCB and/or RWQCB consultation requirement, described above.

5.2 Characterize Discharge Quantity and Quality
Groundwater Dewatering Operations
To determine if groundwater dewatering will be likely, SCG will obtain historical groundwater quality, depth, and yield information from previous SCG projects and/or from publicly available data such as the Department of Water Resources’ Water Data Library, if available.

2 The Permit describes a hazardous waste release site as the site and associated chemical plume. The plume is defined by the areal extent of groundwater containing the hazardous material (or a daughter product) at a concentration above the maximum contaminant level or remedial cleanup concentration established by a regulatory agency, whichever is lower.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 5 When the height of the water table indicates dewatering is anticipated during a construction project, a designated SCG person will summarize available groundwater quality data and collect additional data, if needed, to determine water quality. Based on available historical information and the project water management strategy, SCG may perform pre-construction groundwater sampling (e.g., during a potholing event or geotechnical investigations, if necessary. In addition, groundwater depth measurements and pump testing may be conducted to determine groundwater extraction flow rates associated with the proposed dewatering approaches.

Hydrostatic Testing Operations
As part of hydrostatic testing planning, a designated person at SCG will estimate the quantity and quality of the discharge water. This assessment may include source water sampling and the condition of test pipe segment.

If it is determined during the assessments described above that the discharge water is unlikely to meet effluent limitations, cost effective treatment options will be explored (e.g., series of bag filters, granulated activated carbon [GAC], clay filtration). If effluent limitations cannot be met through cost effective treatment options, the water will be transported to an approved wastewater treatment facility for final disposal.

5.3 Pre-Discharge Notifications
The Project Manager (PM) or other designated responsible person will prepare the Discharge Reporting Form in Appendix 2 for all planned discharges under the Permit. Once the form is completed it will be submitted to the Water Quality SME at [email protected].

Based on pre-discharge planning, data gathering, and the Discharge Reporting Form, a SCG Water Quality SME, Cultural Resource SME, or other designated responsible person will prepare and submit a 30-day Notification to Tribal Entities, when required, and a 7-business day notification to the appropriate RWQCB, SWRCB, and MS4 owner or operator, if applicable. A project with multiple hydrostatic tests using the same source water or dewatering discharges, or both, may be covered under a single notification.

The Pre-Discharge Notification to the RWQCB, SWRCB, and MS4 owner or operator will consist of:
• Attachment C of the Permit, the Pre-Discharge Notification Form. • A map (local and/or regional) showing project location and proposed discharge locations; and • Any additional permitting or documentation required by the MS4, if applicable.

When a Pre-Discharge Notification to Tribal Entities’ representative is required, it will consist of:
• A general description and map of the location of pipeline segments to be tested, and points of discharge, as available;
• Contact information for SCG Cultural Resource SME;
• Estimated date(s) discharge(s) are proposed to occur; and • As applicable, site-specific cultural resource avoidance and minimization measures (AMMs), including BMPs, to be implemented at the discharge site.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 6 6.0Best Management Practices
BMPs are defined in the Permit as follows:

Methods, measures, or practices designed and selected to reduce or eliminate the discharge of pollutants to waters of the United States, non-federal surface water, or groundwater. Best Management Practices include structural and non-structural controls, and operations and maintenance procedures which can be implemented prior, during, and/or after discharge producing activities.

SCG has developed a Best Management Practice Manual for Water Quality and Storm Water Management (SCG BMP Manual) for all projects throughout SCG service territory. BMPs in the SCG BMP Manual were determined to be applicable to natural gas utility projects. BMPs include sediment controls, waste management and material controls, non-storm water discharge controls, and soil erosion controls.

6.1 Generally Applicable Best Management Practices
SCG implements applicable BMPs at its construction projects throughout its service area. For projects disturbing more than 1 acre and that are not otherwise exempt from the California Stormwater Construction General Permit (CGP) NPDES No. CAS000002, SCG prepares and trains construction crews on a Stormwater Pollution Prevention Plan (SWPPP) that specifies construction project BMPs. For projects that disturb 1 acre or less, or that are otherwise exempt from the CGP, SCG ensures all construction crews and contactors implement the SCG BMP Manual to ensure protection of water quality.

The SCG BMP Manual outlines BMPs to be used during construction activities in the follow categories:
• Sediment Controls;
• Waste Management and Material Controls;
• Non-Storm Water Discharge Controls; and
• Soil Erosion Controls.

SWPPPs, when applicable, are available onsite during active construction, including during water management and discharge. The SCG BMP Manual is made available to all employees and contractors, should it need to be referenced during active construction.

6.2 Best Management Practices Applicable to Water Storage, Treatment, and Discharge
Many of the BMPs contained within the SCG BMP Manual are applicable to water storage, treatment, and discharge activities. The BMPs in this section are additional BMPs specific to water storage, treatment, and discharge.

Training
Training for construction crews will be conducted at projects, to ensure all compliance with conditions in the Permit.

Spill Prevention
Spill prevention measures are required for management of water prior to final disposal. These measures may include, but are not limited to, the following:

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 7 • Providing site security to prevent unauthorized discharge from storage tanks. Site security may include, but is not limited to, locking out tank discharge valves, locating tanks within a perimeter security fence, and/or onsite security personnel;
• Ensuring that all storage container side hatches and connections are closed prior to adding liquid to a tank;
• Positioning a spotter at the top hatch in verbal communication with vacuum truck transfer pump operator during tank filling to prevent tank overfills; • Covering storm drain inlets that have the potential to be in the path of a spill, with appropriate BMPs from the SCG BMP Manual;
• Use of polyethylene film (or equivalent material) containment to protect soil from blowdown and potential spills resulting from vacuum truck operations at test heads; and • Use of welded water conveyance pipe or performing daily inspections at pipe connections to confirm the absence of leaks.

Segregation of Test Water, Groundwater, and Process Solutions SCG may implement the following BMPs, or equivalent, to prevent cross-contamination of process solutions, liquid wastes, source water, groundwater, untreated test water, and treated test water and groundwater:
• Sufficient dedicated tank capacity is provided for process solutions, liquid wastes, source water, groundwater, untreated test water, and treated test water and groundwater; • Tanks are required to be mobilized to the site in a clean condition and are inspected visually prior to filling; and
• Tanks may be labeled with contents at the time they begin to be filled.

Land Discharge Best Management Practices
The following BMPs apply to discharging to land:
• Land discharge areas are visually monitored and are adjusted, as needed, to avoid ponding, offsite or surface water discharges, and nuisance conditions; • Spray irrigation of discharges is not allowed when wind speeds (including gusts) exceed 30 miles per hour based on wind speed information at a nearby government weather station; and • If discharges are to occur in sensitive areas and the discharge will result in saturated surface soils or otherwise impact species that reside in subterranean burrows, an environmental review will be conducted before the discharge is initiated. Environmental review involves an assessment of existing conditions and may include a query of species accounts using published literature and data provided by the California Natural Diversity Data Base (CNDDB), field surveys, field evaluations, and biological resource monitoring. If there is the potential to have a substantial adverse effect on sensitive species identified as a threatened, endangered, candidate, or special status species identified in regional plans, policies, or regulation, appropriate avoidance and minimization measures will be applied to avoid or minimize impacts where possible. When significant unavoidable impacts to state or federally listed species may occur (e.g. take of listed species), work will begin only after the appropriate state and/or federal permits are secured.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 8 Best Management Practices for Discharges to Percolation, Infiltration, or Evaporation Ponds
The following BMPs apply to discharges to unlined pond systems designed to collect discharges for percolation, evaporation, or subsequent land application to avoid discharge to surface waters:
• Pond discharge areas will be visually monitored and are adjusted, as needed, to avoid offsite or surface water discharges and nuisance conditions;
• SCG will minimize/mitigate vector and mosquito breeding by minimizing weeds and algae and using erosion control to avoid the creation of small coves from discharge flows; and • Prior to discharge, SCG will confirm that the pond(s) have sufficient capacity to accommodate the discharge in addition to other planned inflows, design seasonal precipitation (25-year return period month values for the active project months), and wind-driven waves, such that a minimum of 1 foot of freeboard can be maintained at all times in all pond(s).

Prevention of Erosion and Hydromodification from Surface Water Discharges SCG’s BMPs to prevent erosion and hydromodification associated with surface water discharge include, but are not limited, the following approaches:
• Using appropriate flow rates and tank storage;
• Discharging to manufactured structures or existing surface water sections designed as points of discharge such as storm drains, culverts, or existing rip-rap areas; and • Where manufactured structures are unavailable, using diffusers to minimize discharge velocities.

Cultural Resource Avoidance and Minimization Measures
As required by the Permit, if a discharge is to be located within a Tribal Entity’s affiliated lands, SCG Water Quality SME, Cultural Resource SME, or other designated person will send the Tribal Entity a notification a minimum of 30 calendar days prior to project initiation, if the Tribal Entity elected to opt in to receive notification. The notification will include information specified in Section II.C.f of the Permit and cultural AMMs to be employed. Potential AMMs are summarized in Table 6-1.

Table 6-1. Cultural Resource Avoidance and Minimization Measures Risk Condition Risk Response May Include
Unanticipated cultural resource
discovery
In the event that a cultural resource is encountered, all earthmoving activity within and around the immediate discovery area shall be diverted until a qualified archaeologist can assess the nature and significance of the find.

Unanticipated human remains
discovered
In the event that human remains are discovered, per State Health and Safety Code Section 7050.5, further disturbances and activities shall cease in any area or nearby area suspected to overlie remains, and the County Coroner shall be contacted. Pursuant to California Public Resources Code (PRC) Section 5097.98, if the remains are thought to be Native American, the Coroner will notify the Native American Heritage Commission, which will then notify the Most Likely Descendant (MLD). The SCG Cultural Resource specialist will be contacted so they may work with the MLD on the respectful treatment and disposition of the remains. Further provisions of California PRC 5097.98 are to be followed as applicable.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 9 Confidentiality of Cultural Resource Information
Any records associated with Native American tribal consultations and tribal cultural resources are subject to the confidentiality provisions consistent with Public Resource Code § 21082.3(c).

7.0Land Discharge Control Strategy

7.1 Effluent Limits and Narrative Standards
Section VII of the Permit specifies numerical effluent limitations for all planned discharges to land:
• Dissolved oxygen in land discharges is limited to 1.0 milligrams per liter (mg/L) or greater; and • Discharges of existing pipe hydrostatic test water are subject to a limit on the maximum concentration of polychlorinated biphenyls (PCBs) of 0.5 micrograms per liter (µg/L).

In addition, Section VIII.C of the Permit specifies where receiving water bodies have the potential of reaching groundwater limitations for those discharges to land authorized under the Permit, they shall not cause or contribute to the exceedance of a water quality objective in the applicable RWQCB Basin Plan.

Section IX.E of the Permit specifies that adequate acreage must be made available to apply discharge at a rate that will not create nuisance conditions. Land application area monitoring shall take place weekly and report any vector generation, saturated soil conditions, odors, or runoff conditions. Additionally, separate phase product monitoring shall take place continuously. If present, oil, including oil sheen, must be separated from the effluent.

Compliance with these numeric and narrative effluent limits and receiving water objectives will be achieved through the treatment controls described in this section and by the BMPs described in Section 6 of this BMP Plan.

If the discharge does not meet all effluent limitations, cost effective treatment options will be explored (e.g. series of bag filters, granulated activated carbon (GAC), and clay filtration). If effluent limitations will not be able to be met through cost effective treatment options, the water will be transported to an approved wastewater treatment facility for final disposal.

Table 7-1. Compliance Monitoring for Land Discharges
Constituent/Parameter Units Sample Type Sampling Frequency Land Application Area1 NA Observe Weekly
PCBs2 mg/L Grab Weekly
Dissolved Oxygen mg/L Grab Weekly
Pond Freeboard3Feet Measure Weekly
Separate Phase Products4 Gallons Measure Continuous
1 Land application area monitoring shall report any vector generation, saturated soil conditions, odors, or runoff conditions.
2 PCBs monitoring is not required when new pipe is being installed. 3 Freeboard shall be measured from the pond water surface to the lowest point of overflow for monitoring of all pond systems.
4Any separate phase products collected (e.g., gas condensate prior to the test initiation, or oil or oil sheen removed from pipeline facilities and/or hydrostatic test wastewater) shall be reported.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 10 7.2 Dewatering Discharge Control Strategy
Site dewatering discharges related to excavation, construction, testing, maintenance and/or repair of natural gas facilities can be from a variety of water sources and as a result, water quality and pollutants present in the water will vary. Dewatering discharges will be managed in accordance with Gas Standard 104.0226, Excavation Dewatering Management.

Water will be pumped in to holding tanks and held prior to discharge. To comply with the dissolved oxygen effluent limit for land discharges, SCG will monitor the dissolved oxygen concentration in the water in holding tanks following dewatering. If needed, the water will be aerated to increase dissolved oxygen levels. Once it is confirmed that the water meets all effluent limitations as prescribed in the Permit, the water will be discharged to land.

While not expected, if there is a likelihood for pollutant(s) to be present above RWQCB Basin Plan objectives, the test water will be sampled and appropriate cost-effective treatment will be performed, prior to discharge, if necessary, to ensure compliance.

7.3 New PipeHydrostatic TestWater Control Strategy
SCG uses potable or non-potable water that meets the company standard as identified in Section 5.1.2 of this BMP Plan for hydrostatic testing of new pipe segments and components, and implements the BMPs described in Section 6 of this BMP Plan.

To comply with the dissolved oxygen effluent limit for land discharges, a designated responsible person will monitor the dissolved oxygen concentration in hydrostatic test water and the water in holding tanks following test completion. If needed, the water will be aerated to increase dissolved oxygen levels.

Based on the use of water that meets the company standard and testing of new pipe, it is not anticipated that contaminates will exceed Basin Plan objectives. If there is a likelihood for pollutant(s) to be present above RWQCB Basin Plan objectives, the water will be sampled and appropriate costeffective treatment will be performed, prior to discharge, if necessary, to ensure compliance.

7.4 Existing Pipe Hydrostatic TestWater Control Strategy Existing Pipe Hydrostatic Test Water Discharge Characteristics Existing pipe that will be hydrostatically tested may contain the following contaminants:
• Sediments from historical pipeline deposits;
• Insoluble iron and manganese (rust) from pipeline carbon steel; • Low concentrations of soluble metals likely from historical pipeline deposits; and • Soluble organic compounds from residual pipeline condensates.

Pipeline Segment Rinsing
An element of SCG’s control strategy for land discharge of existing pipe hydrostatic test water is to rinse the pipeline segments prior to hydrostatic testing. Rinsing (known as the cleaning slug) may include the removal of condensates at known drip legs or known low points. This is done as a precautionary step to reduce the volume of potential contaminants in the post-test discharge water. The cleaning slug is purged and placed into a vacuum truck or holding tank. Samples may be collected for the purposes of waste characterization and waste acceptance, and disposal of the cleaning slug will occur offsite at an approved commercial waste facility in accordance with federal, state, and local requirements.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 11 Control Strategy for Pollutants
Table 7-2. Control Strategy for Pollutants
Pollutant Control Strategy
Sediment Controls
Removal of minor sediment quantities resulting from insoluble iron, manganese, and residual pipeline scale particulates mobilized by hydrostatic test water can be readily achieved with tank settling followed by a combination of bag and cartridge filtration.

Soluble Organic Pollutant Controls
Potential soluble organic pollutants in existing pipeline hydrostatic test water include trihalomethanes from potable water and hydrocarbons from pipeline condensate residual material. SCG will evaluate the need for treatment to meet effluent limits and will implement an appropriate treatment technology, such as GAC.

Soluble Inorganic Pollutant Controls
Provided that company standard source water is used and the pipeline segment is rinsed, soluble inorganic pollutants are not expected to be present in concentrations exceeding basin plan groundwater objectives.

Dissolved Oxygen Controls
SCG will sample water prior to discharge to confirm that the discharge will meet the dissolved oxygen effluent limit. A hand-held field meter that uses a U.S EPA-approved algorithm/method and is calibrated and maintained in accordance with the manufacturer's instructions, may be used.

Separate Phase Products
SCG will monitor discharges for separate phase products and their associated sheen. If present, oil, including oil sheen, will be separated from the effluent. These practices ensure that there will be no separate phase products in the discharge.

If PCBs are present in the existing pipeline, they would be expected to be adsorbed in to the oily separate phase products. PCB samples are taken prior to discharge to ensure the concertation of PCBs meets effluent limitations.

7.5 Additional Control Provisions
Provisions for Water Treatment Service Contractors
If water treatment is required to meet effluent limitations, SCG will use qualified contractors to perform water treatment services. These contractors provide staff, with appropriate training, to operate the water treatment equipment.

Indicators of Noncompliance
If during a planned discharge, the effluent shows an indication of noncompliance (an unusual color or smell present or observation of a sheen), if practical, and it is safe to do so the discharge shall be stopped immediately. If at this time it is not possible to stop the discharge, the discharge is now an emergency, see section 9.2 of this BMP Plan for procedures.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 12 8.0Surface Water Discharge Control Strategy

8.1 Effluent and Receiving Water Limitations, and Receiving Water Monitoring Numerical Effluent Limitations
The Permit specifies numerical effluent limitations for planned discharges to surface waters; see Appendix 3:
• Effluent limits for discharges to inland surface waters, enclosed bays, and estuaries are specified in Section V.A. of the Permit;
• Effluent limits for discharges to the Pacific Ocean are specified in Section V.B. of the Permit; • Effluent limits for total petroleum hydrocarbons applicable to hydrostatic testing discharges from existing facilities as specified in Section V.C: of the Permit:
o The pollutant concentrations of Total Petroleum Hydrocarbons as Diesel in the discharge shall not exceed 2.0 mg/L; and
o The pollutant concentrations of Total Petroleum Hydrocarbons as Gasoline3 in the discharge shall not exceed 5.0 μg/L.
• Effluent limits applicable to all surface water discharges as specified in Section V.D of the Permit:
o Oil and grease shall not exceed 10 mg/L;
o Turbidity shall not exceed 50 Nephelometric Turbidity Units (NTU); and o pH in the discharge shall be within 6.0 to 9.0 standard units. • For all previously-chlorinated4 planned discharges directly into, or within 300 feet of, the receiving water, the total residual chlorine concentration shall not exceed the following limitations:
o 0.011 mg/L, as a 4-day average and
o 0.019 mg/L, as a 1-hour average
Per Section X.B of the Permit, a discharge is in compliance with the total residual chlorine effluent limitations if the total residual chlorine concentration measured by a handheld field chlorine meter is below a minimum level (quantifiable level) of 0.1 mg/L chlorine or a positive de-chlorination agent residual.

The monitoring instruments used to obtain field data shall be maintained and calibrated in accordance with the manufacturer’s recommendations. All information on monitoring instrument calibration shall be reported with the field monitoring data.

If, the discharge does not meet all effluent limitations, cost effective treatment options will be explored (e.g. series of bag filters, GAC, and clay filtration). If effluent limitations will not be able to be met through cost effective treatment options, the water will be transported to an approved disposal facility or appropriately permitted commercial treatment facility for final disposal.

3 A discharge is in compliance with the Total Petroleum Hydrocarbons as Gasoline effluent limitation if the laboratory analytical monitoring result is “non-detect” using a U.S. EPA authorized laboratory analytical method with a method detection limit of 23 μg/L or lower. 4 For example, treated potable water, recycled water, etc.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 13 Table 8-1. Compliance Monitoring for Surface Water Discharges Constituent/Parameter Units Sample Type Sampling Frequency California Ocean Plan
Constituents/Parameters µg/L Grab Weekly2
pH Standard Units Grab Weekly2
Priority Pollutants µg/L Grab Weekly2
Oil and Grease mg/L Grab Weekly2
Temperature F Grab Weekly2
Total Petroleum
Hydrocarbons as
Gasoline1
µg/L Grab Weekly2
Total Petroleum
Hydrocarbons as Diesel1 mg/L Grab Weekly2
Total Residual Chlorine mg/L Grab Weekly2
Turbidity NTU Grab Weekly2
1 Additional monitoring requirement for discharges from existing facilities. 2Weekly sampling frequency is required only for those pollutants/parameters that exceeded effluent limitations in the first sampling event.

For each project, if four consecutive weekly samples of a constituent that exceeded its effluent limitation in the initial sampling show concentrations less than the effluent limitation, monitoring for that constituent shall be reduced to monthly.

For every five million gallons discharged, monitoring will be conducted to determine if the discharge characteristics have changed and if new monitoring requirements are needed. If the initial results for the second five-million-gallon monitoring show no change from the initial results of the first five-milliongallon monitoring, further monitoring every five million gallons, is not required to be conducted.

Receiving Water Limitations
In addition to numerical effluent limits, narrative receiving water limitations are specified in Section VIII.A of the Permit. However, due to the low threat nature of the discharges covered under SCG authorization, compliance with effluent limitations is expected to achieve compliance with the receiving water limitations.

The Permit specifies the following narrative receiving water limitations and performance standards:
• Discharges to wetlands and vernal pools are prohibited; • Aquatic toxicity from chlorine and chemical constituents in the discharge is to be prevented and will not affect beneficial uses;
• Riparian erosion and hydromodification will be prevented; • Sediment, turbidity, trash, and color impacts are to be minimized and will not cause a nuisance or affect beneficial uses;
• Introduction of chemicals or other substances into the discharge following treatment will be prevented and will not adversely affect beneficial uses; and SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 14 • The addition of pollutants from non-permitted process waters or chemical spills will be prevented.

Compliance with these receiving water limits and performance standards is achieved both through the treatment controls described in this section and by the BMPs described in Section 6 of this BMP Plan.

8.2 Dewatering Discharge Control Strategy
Site dewatering discharges related to excavation, construction, testing, maintenance and/or repair of natural gas facilities can be from a variety of water sources and as a result, water quality and pollutants present in the water will vary. Dewatering discharges will be managed in accordance with Gas Standard 104.0226, Excavation Dewatering Management.

Water will be pumped in to holding tanks and held prior to discharge. Once it is confirmed that the water meets all effluent limitations, as prescribed in the Permit, the water will be discharged to surface waters.

While not expected, if there is a likelihood for pollutant(s) to be present above RWQCB Basin Plan objectives, the water will be sampled and appropriate cost-effective treatment will be performed, prior to discharge, if necessary, to ensure compliance.

Control Strategy for Pollutants
Sediment Controls
Removal of minor amount of sediment in the water can be readily achieved with tank settling, and if needed, bag and cartridge filtration.

Soluble Organic Pollutant Controls
SCG will determine the need for organic pollutant controls based on pre-discharge characterization. It is anticipated that organic contamination will be limited to trace concentration of a limited number of organic pollutants. SCG will evaluate the need for GAC treatment, on a case-by-case basis, when required, to meet effluent limitations.

Soluble Inorganic Pollutant Controls
Certain groundwaters in California may contain soluble concentrations of naturally occurring metals in excess of surface water effluent limits, including arsenic, selenium, and chromium. In pre-discharge characterization of test water, SCG will sample to anticipate soluble metal treatment needs. Cost effective treatment methods will evaluated a case-by-case basis, when required to meet effluent limitations.

Chlorine Toxicity Controls
The Permit imposes a total residual chlorine limit applicable to previously-chlorinated discharges that discharge directly into a receiving water or discharge to a conveyance at a point that is within 300 feet of the receiving water. In the event that of a dewatering discharge of previously chlorinated water, and the discharge point is directly into, or within 300 feet of, a receiving water, SCG will incorporate a dichlorination step into the treatment system (such as a final carbon polishing vessel) and will include field measurement of total residual chlorine to demonstrate a residual below the quantifiable level of

0.1 mg/L.

8.3 New Pipe Hydrostatic Test Water Control Strategy
SCG uses potable or non-potable water that meets the company standard as identified in Section 5.1.2 for hydrostatic testing of new pipe segments and components, and implements the BMPs described in Section 6 of this BMP Plan.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 15 Water from hydrostatic tests will be held in holding tanks following test completion. Sampling will be conducted prior to discharge to ensure all effluent limitations are met. The test water will be sampled and appropriate cost-effective treatment will be performed, prior to discharge, if necessary, to ensure compliance.

Based on the use of water that meets the company standard and testing of new pipe, it is not anticipated that contaminates will exceed Basin Plan objectives. If there is a likelihood for pollutant(s) to be present above RWQCB Basin Plan objectives, the water will be sampled and appropriate costeffective treatment will be performed, prior to discharge, if necessary, to ensure compliance.

Control Strategy for Pollutants
Chlorine Toxicity Controls
The Permit imposes a total residual chlorine limit applicable to previously-chlorinated discharges that discharge directly into a receiving water or discharge to a conveyance at a point that is within 300 feet of the receiving water. In the event that new-pipe hydrostatic test will use a previously chlorinated source water, and the discharge point is directly into, or within 300 feet of, a receiving water, SCG will incorporate a de-chlorination step into the treatment system (such as a final carbon polishing vessel) and will include field measurement of total residual chlorine to demonstrate a residual below the quantifiable level of 0.1 mg/L.

8.4 Existing Pipe Hydrostatic Test Water Control Strategy Existing Pipe Hydrostatic Test Water Discharge Characteristics Existing pipe that will be hydrostatically tested may contain the following contaminants:
• Sediments from historical pipeline deposits;
• Insoluble iron and manganese (rust) from pipeline carbon steel; • Low concentrations of soluble metals likely from historical pipeline deposits; and • Soluble organic compounds from residual pipeline condensates.

Pipeline Segment Rinsing
An element of SCG’s control strategy for land discharge of existing pipe hydrostatic test water is to rinse the pipeline segments prior to hydrostatic testing. Rinsing (known as the cleaning slug) may include the removal of condensates at known drip legs or known low points. This is done as a precautionary step to reduce the volume of potential contaminants in the post- test discharge water. The cleaning slug is purged and placed into a vacuum truck or holding tank. Samples may be collected for the purposes of waste characterization and waste acceptance, and disposal of the cleaning slug will occur offsite at an approved commercial waste facility in accordance with federal, state, and local requirements.

Control Strategy for Pollutants
Table 8-2. Control Strategy for Pollutants
Pollutant Control Strategy
Sediment Controls
Removal of minor sediment quantities resulting from insoluble iron, and manganese, and residual pipeline scale particulates mobilized by the hydrostatic test water can be typically be achieved with tank settling, and if necessary, followed by a combination of bag and cartridge filtration.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 16 8.5 Additional Control Provisions
Provisions for Water Treatment Service Contractors
If water treatment is required to meet effluent limitations, SCG will use qualified contractors to perform water treatment services. These contractors provide staff, with appropriate training, to operate the water treatment equipment.

Soluble Organic Pollutant Controls
Potential soluble organic pollutants in existing pipeline hydrostatic test water include trihalomethanes from high quality source water and hydrocarbons from pipeline condensate residual material. SCG will evaluate the need for treatment to meet effluent limits and will implement an appropriate treatment technology, such as granular activated carbon (GAC).

Soluble Inorganic Pollutant Controls
High quality source water that originates in whole, or in part, from groundwater supply wells may contain soluble metal concentrations above the Permit effluent limits, which, in many cases, are below drinking water MCLs. Therefore, before test water can be discharged to surface waters, it may require treatment to remove dissolved metals.

In the event that SCG selects a discharge strategy that includes discharging existing-pipe test water to surface waters, SCG would sample source water and post-test water for both total and field-filtered concentrations of metals to anticipate soluble metal treatment needs.

Cost effective treatment methods will be evaluated on a case-by-case basis, when required, to meet effluent limitations.

Chlorine Toxicity Controls
The Permit imposes a total residual chlorine limit applicable to previously-chlorinated discharges that discharge directly into a receiving water or discharge to a conveyance at a point that is within 300 feet of the receiving water. If existing-pipe hydrostatic test will use a previously chlorinated source water, and the discharge point is directly into, or within 300 feet of, a receiving water, SCG will incorporate a dichlorination step into the treatment system (such as a final carbon polishing vessel) and will include field measurement of total residual chlorine to demonstrate a residual below the quantifiable level of 0.1 mg/L.

Separate Phase Products
The Permit imposes oil and grease effluent limits for all surface water discharges and total petroleum hydrocarbons as diesel and total petroleum hydrocarbons as gasoline limits for hydrostatic testing from existing facilities. Hydrostatic testing from existing facilities have the potential to contain these pollutants above Permit effluent limitations, and treatment of post-test water may be likely.

If PCBs are present in the existing pipeline, they would be expected to be adsorbed in to the oily separate phase products. PCB samples are taken prior to discharge to ensure the concertation of PCBs meets effluent limitations.

In the event that SCG selects a discharge strategy that includes discharging existing-pipe test water to surface waters, SCG would sample post-test water for oil and grease to anticipate treatment needs.

Cost effective treatment methods will evaluated a case-by-case basis, when required, to meet effluent limitations.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 17 Indicators of Noncompliance
If during a planned discharge, the effluent shows an indication of noncompliance (an unusual color or smell present or observation of a sheen), if practical, and it is safe to do so the discharge shall be stopped immediately. If at this time it is not possible to stop the discharge, the discharge is now an emergency, see section 9.2 of this BMP Plan for procedures.

9.0Unplanned, Emergency, and NoncompliantDischarge
Control Strategy
This section presents a summary of requirements related to unplanned, emergency, and noncompliant discharges and guidance for complying with these requirements.

9.1 Unplanned Discharges
Unplanned Discharge Definition
As defined in the Permit, an unplanned discharge is a discharge due to dewatering resulting from water pipe ruptures, groundwater seepage, collection of rain water, incidental storm water inflow, local runon, or urgent operations, maintenance and/or repair activities.

Requirement to Implement Appropriate Best Management Practices and Controls for Unplanned Discharges
SCG will implement applicable BMPs as soon as feasible after taking necessary actions to protect public health and safety. Potentially applicable BMPs are described in Section 6 of this BMP Plan and may include, but are not limited to, the following:
• Rerouting the discharge to prevent contamination of the discharge with construction materials; • Route the discharge to a suitable location to avoid hydromodification or erosion at the discharge location;
• Implement intake screening and tank settling as soon as practicable to minimize effluent turbidity;
• Cover storm drain inlets with appropriate BMPs specified in the SCG BMP Manual; • If during an unplanned discharge, the effluent shows an indication of noncompliance (an unusual color or smell present or observation of a sheen), if practical, and it is safe to do so the discharge shall be stopped immediately. If at this time it is not possible to stop the discharge, the discharge is now an emergency, see section 9.2 of this BMP Plan for procedures.

Monitoring
Monitoring is not required for unplanned discharges.

Notification
Internal Notification
Any unplanned discharge must be reported to the Water Quality SME if it occurs during business hours, or the on-call FER for after hours, or other designated responsible person.

As soon as feasible after the unplanned discharge, the Project Manager (PM) or other designated responsible person will prepare the Discharge Reporting Form in Appendix 2, for reporting and tracking SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 18 purposes. Once the form is completed it will be submitted to the Water Quality SME at [email protected].

SCG employees and contractor crews who have a potential to witness an unplanned discharge will be trained on the notification requirements.

Tribal Entities Notification
SCG will promptly notify tribal entities on the SWRCB Native American Tribe Pre-Discharge Notification List if tribal cultural resources may be impacted. SCG shall promptly terminate the discharge to avoid further impacts until cultural resource matters are addressed. In such cases, addressing the cultural resource involves work crews stopping work in the vicinity of the cultural resource discovery to avoid damage until a qualified archaeologist can assess the significance of the find. If necessary, treatment measures will be developed in consultation with appropriate agencies and tribal representatives.

9.2 Emergency Discharges
Emergency Discharge Definition
As defined in the Permit, an emergency discharge is a discharge due to a sudden unexpected occurrence involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services, including the provision of natural gas supplies. Emergency discharges include, but are not limited to, discharges from emergency natural gas facility failure and repair and ruptures during hydrostatic testing.

Requirement to Implement Appropriate Best Management Practices and Controls for Unplanned and Emergency Discharges
SCG will implement BMPs applicable to the discharge as soon as feasible after taking necessary actions to protect public health and safety. Potentially applicable BMPs are described in Section 6 of this BMP Plan and may include, but are not limited to, the following:
• Rerouting the discharge to prevent contamination of the discharge with construction materials; • Route the discharge to a suitable location to avoid hydromodification or erosion at the discharge location;
• Implement intake screening and tank settling as soon as practicable to minimize effluent turbidity;
• Cover storm drain inlets with appropriate BMPs specified in the SCG BMP Manual; and Monitoring
Monitoring is not required for emergency discharges.

Notification
Internal Notification
Any emergency discharge must be reported to the Water Quality SME if the discharge occurs during business hours, or on-call FER if after hours, or other designated responsible personnel. Within two (2) days after the emergency discharge, the Project Manager (PM) or other designated responsible person will prepare the Discharge Reporting Form in Appendix 2, for reporting and tracking purposes. Once the form is completed it will be submitted to the Water Quality SME at [email protected].

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 19 SCG employees and contractor crews who have a potential to witness an unplanned or emergency discharge will be trained on the notification requirements.

External Notification
Within 24 hours of becoming aware of an emergency discharge, SCG Water Quality SME or other designated responsible person shall notify the SWRCB (and MS4 operators, if applicable). The notification within 24 hours must be provided verbally by calling (916) 319-9152 or electronically by emailing NPDES [email protected].

Tribal Entities Notification
SCG Water Quality and Cultural Resource SMEs, or other designated responsible person, will promptly notify tribal entities on the SWRCB Native American Tribe Pre-Discharge Notification List if tribal cultural resources may have been impacted. SCG shall promptly terminate the discharge to avoid further impacts until cultural resource matters are addressed. In such cases, addressing the cultural resource involves work crews stopping work in the vicinity of the cultural resource discovery to avoid damage until a qualified archaeologist can assess the significance of the find. If necessary, treatment measures will be developed in consultation with appropriate agencies and tribal representatives.

Documentation of Emergency Discharge Response
Upon being notified by project staff that an emergency discharge has occurred, the on-site designated responsible person will document the following information:
• The nature of the discharge and, how it qualifies as an emergency discharge; • Whether the discharge is ongoing or is complete and estimated volume; • If the discharge is complete, the BMPs and controls that were implemented; and • If the discharge is ongoing or expected to reoccur, BMPs that will be implemented to meet Permit requirements, the associated implementation schedule, and why it is not feasible to implement BMPs and controls sooner than the proposed schedule.

All documentation shall be sent to the Water Quality SME or designated responsible person to complete the written report described below.

Reporting of Emergency Discharge
The SCG Water Quality SME or designated responsible person will provide a written report within five (5) days of the time SCG becomes aware of the emergency discharge. The notification shall include all of the following information:
• The limitations for which the emergency discharge occurred; • The date, time, location, and estimated duration of the emergency discharge; • Receiving water body, if applicable;
• The estimated volume of discharge during the emergency discharge; • The cause of the emergency discharge; and
• The corrective actions taken or planned to (1) prevent future emergency discharges and/or (2) repair the system failure.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 20 9.3 Noncompliant Discharges
Noncompliant Discharge Definition
The State and Regional Water Boards deem discharges out of compliance with effluent limitations when a pollutant concentration in the monitoring sample is greater than or equal to the corresponding effluent limitation and greater than or equal to the Reporting Limit for the pollutant.

Receiving Water Monitoring
Receiving water monitoring is required when a noncompliant discharge to any surface water threatens beneficial uses in the receiving water. However, the Monitoring and Reporting Program (Attachment E of the Permit) does not require monitoring of discharges that do not go to a water of the U.S, or are associated with an emergency discharge. Additionally, monitoring is not required for discharges to constructed features, such as constructed MS4 systems, irrigation canals, and ditches that are not waters of the U.S.

When it has been determined there has been a noncompliant discharge to any surface water that does not meet any of the exceptions outlined above that may impact beneficial uses, SCG will conduct receiving water monitoring. In such instances, SCG will monitor the surface water visually at and downstream of the discharge location. Monitoring will consist of digital photographs and documentation of observed effects the discharge has on the surface water in regard to erosion, discoloration, impact on aquatic life, sedimentation, floating material, visible films, sheens, or coatings, and potential nuisance conditions.

For noncompliant discharges, SCG will include photographs and documented observations of the receiving water conditions in its Annual Monitoring Report. If the conditions surrounding the surface water presents a hazard to monitoring personnel, SCG will conduct visual monitoring using telephoto lenses and binoculars. If further hazards exist that may render visual monitoring unsafe, monitoring is not required; however, SCG will document such hazards in the monitoring report.

Notification
Internal Notification
Any noncompliance which may impact beneficial uses of the receiving waters, endanger health, or endanger the environment must be reported to the Water Quality SME, during business hours, or oncall FER after hours, or other designated responsible person Within two (2) days after the noncompliant discharge, the Project Manager (PM) or other designated responsible person will prepare the Discharge Reporting Form in Appendix 2, for reporting and tracking purposes. Once the form is completed it will be submitted to the Water Quality SME at [email protected].

SCG employees and contractor crews who have a potential to witness an unplanned or emergency discharge will be trained on the notification requirements.

External Notification
Within 24 hours of becoming aware of any noncompliance which may impact beneficial uses of the receiving waters, endanger health, or endanger the environment, the SCG Water Quality SME or other designated responsible person shall notify the SWRCB (and MS4 operators, if applicable). The notification within 24 hours must be provided verbally by calling (916) 319-9152 or electronically by emailing NPDES [email protected].

Documentation Discharge Response
If during a planned or unplanned discharge, the effluent shows an indication of noncompliance (an unusual color or smell present or observation of a sheen), if practical, and it is safe to do so the SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 21 discharge shall be stopped immediately. If at this time it is not possible to stop the discharge, then the on-site designated responsible person will document the following information:
• The nature of the discharge and how it may be a noncompliant discharge; • Whether the discharge is ongoing or is complete and the estimated volume; • If the discharge is complete, the BMPs and controls that were implemented; and • If the discharge is ongoing or expected to reoccur, BMPs that will be implemented to meet the Permit requirements, the associated implementation schedule, and why it is not feasible to implement BMPs and controls sooner than the proposed schedule.

All documentation shall be sent to the Water Quality SME to complete the written report described below.

Reporting
The SCG Water Quality SME will provide a written report within five (5) days of the time SCG becomes aware of the noncompliant discharge which may impact beneficial uses of the receiving waters, endanger health, or endanger the environment. The report shall include all of the following information:
• The limitations for which the noncompliant discharge occurred; • The date, time, location, and estimated duration of the noncompliant discharge; • Receiving water body;
• The estimated volume of discharge during the noncompliant discharge; • The cause of the noncompliant discharge; and
• The corrective actions taken or planned to (1) prevent future noncompliant discharges and/or (2) repair the system failure.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN APPENDIX 2: PRE-DISCHARGE NOTFICATION FORM
APPENDIX 2-1
Appendix 2: Discharge Reporting Form
This form is applicable for planned, unplanned, and emergency discharges authorized under Statewide General Order for Discharge from Natural Gas Utility Construction, Operation, and Maintenance Activities (Order 2017-0026-DWQ), (Permit). Once the discharge has been planned, or after it has occurred (for unplanned or emergency discharges), please fill out this form to the best of your ability.

For discharges for beneficial reuse complete Sections 1 and 2, for discharges to surface waters complete Sections 1 and 3, and for discharges to land complete Sections 1 and 4. Please direct all questions and return completed form to Environmental Services, Water Quality, [email protected].

SECTION 1: PROJECT AND GENERAL DISCHARGE INFORMATION
Project Name or Facility
Operating Group
Discharge Start Date Project End Date Discharge End Date Estimated Volume
SCG Contact Person Alternate Contact (if applicable)
Phone Number Phone Number
Email Email
Contractor (if applicable)
Contact Person
Phone Number Email
Mailing Address
Discharge Location: (Please provide a map of the discharge location) Regional Board
Latitude Longitude
Address
City County
Type of Discharge (check one box for each A, B, and C)
A:
☐ Hydrostatic testing water from new natural gas facilities ☐ Hydrostatic testing water from existing natural gas facilities ☐ Site dewatering related to excavation, construction, testing, maintenance, and/or repair of natural gas facilities
☐ Other. If other, please contact [email protected], right away to ensure the discharge is authorized under the Permit.

B:
☐ Planned Discharge. Scheduled discharges due to dewatering or hydrostatic testing of new and/or existing natural gas facilities related to excavation, construction, testing, maintenance, operation and/ or repair.

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 APPENDIX 2: PRE-DISCHARGE NOTFICATION FORM
APPENDIX 2-2
☐ Emergency Discharge. Discharges due to a sudden unexpected occurrence involving a clear and imminent danger, demanding immediate action to prevent or mitigate loss of, or damage to, life, health, property, or essential public services, including the provision of natural gas supplies. ☐ Unplanned Discharge. Discharges due to dewatering resulting from water pipe ruptures, groundwater seepage, collection of rain water, incidental storm water inflow, local run-on, or urgent operations, maintenance and/or repair activities.

C:
☐ Discharge for beneficial reuse (dust control, construction supply water, urban or agricultural irrigation, or other) (Fill out Section 2, of this form) If the discharge will not be used for beneficial reuse, please explain why reuse is not feasible:
☐ Discharge to Surface Water (Fill out Section 3, of this form) ☐ Discharge to Land (Fill out Section 4, of this form)
Best Management Practices or Treatment:

Describe the Best Management Practices and/or treatment methods (with appropriate citations to the Best Management Practices and Control Strategy Plan), that are anticipated to be used to ensure that the discharge maintains compliance with the terms and conditions of the Permit.

Post Discharge: If the discharge is planned, submit all required monitoring results to [email protected] after the discharge has occurred. If possible, please submit monitoring data in an excel format with minimum levels and method detection limits for each constituent.

SECTION 2: DISCHARGE FOR BENEFICIAL RE-USE
Identify the potential beneficial reuses the discharge may be used for, prior to ultimate disposal. (Check all that apply):
☐ Dust Control ☐ Urban or Agricultural Irrigation
☐ Construction Supply Water ☐ Other
If other, please explain:

SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 APPENDIX 2: PRE-DISCHARGE NOTFICATION FORM
APPENDIX 2-3
SECTION 3: PLANNED DISCHARGES TO SURFACE WATERS
Describe location of discharge and name(s) of receiving water body. Ensure the provided map shows project location and discharge location(s) and shows identifying information for the surface waters, municipal storm drain systems, and/or other conveyance systems proposed to receive discharges.

Does the discharge have multiple outfall locations with same source water, and with similar discharge characteristics? ☐ Yes ☐ No/NA Is any portion of the discharge to a municipal separate storm sewer system? If yes, identify the municipal separate storm sewer system and the associated municipality: ☐ Yes ☐ No
Cultural Resources Considerations for Planned Discharges:

If known, will the discharge be to surface waters affiliated with any Native American Tribes? If yes, a 30-day notification and site-specific Avoidance Minimization Measures may be required.
☐ Yes ☐ No
Biological Resources Considerations for Planned Discharges:

Is revegetation required for the project? ☐ Yes ☐ No
SECTION 4: DISCHARGES TO LAND
Describe location of discharge. Ensure the provided map shows project location and discharge locations. Provide identifying information for specific plots of land proposed to receive discharges.

Cultural Resources Considerations for Planned Discharges:

If known, will the discharge be to lands affiliated with any Native American Tribes? If yes, a 30-day notification and site-specific Avoidance Minimization Measures may be required.
☐ Yes ☐ No
Biological Resources Considerations for Planned Discharges:

If known, will the discharge be in an environmentally sensitive area? Is there potential to have a substantial adverse effect on sensitive species? ☐ Yes ☐ No Will wastewater and/or treated groundwater be applied to ponds, result in saturated surface soils, or otherwise impact sensitive species that reside in subterranean burrows?
☐ Yes ☐ No
Is revegetation required for the project? ☐ Yes ☐ No
Hazardous Materials Considerations:

If know, for discharges as a result of site dewatering, will the project occur within 250 feet of a hazardous materials site? ☐ Yes ☐ No/NA SOUTHERN CALIFORNIA GAS COMPANY BEST MANAGEMENT PRACTICES AND CONTROL STRATEGY PLAN | JULY 2018 APPENDIX 3: FINAL EFFLUENT LIMITATIONS FOR PLANNED DISCHARGES TO SURFACE WATERS APPENDIX 3-1
Appendix 3: Final Effluent Limitations for Planned Discharges to Surface Waters
Below are the Permit sections addressing all effluent limitations for planned discharges to surface waters, as stated in the Permit.

STATEWIDE GENERAL ORDER FOR DISCHARGES FROM ORDER WQ 2017-0029-DWQ NATURAL GAS UTILITY CONSTRUCTION, OPERATION NPDES NO. CAG670001

AND MAINTENANCE ACTIVITIES
APPENDIX 3-2
V. FINAL EFFLUENT LIMITATIONS FOR PLANNED DISCHARGES TO WATERS OF THE U.S.

The discharge shall not exceed the effluent limitations listed in the tables below. The Discharger shall collect a representative sample of the effluent prior to discharge to a water of the U.S.

A. Final Effluent Limitations for Discharges to Inland Surface Waters, Enclosed Bays, and Estuaries
Final Effluent Limitations for Priority Pollutants
Discharges to inland waters, estuaries, and enclosed bays that are waters of the U.S. shall not exceed the maximum daily effluent limitations specified in Table 3 and the applicable maximum daily effluent limitations in Tables 4A, 4B, or 4C for hardness-dependent metals.

Table 3. Final Effluent Limitations for Discharges of Priority Pollutants to Inland Surface Waters, Enclosed Bays, and Estuaries
Constituent CAS Number Effluent Limitation
(µg/L)
1, 1,2-Trichloroethane 79005 1.2
1, 1-Dichloroethylene 75354 0.114
1,1,2,2-Tetrachloroethane 79345 0.34
1,2 Dichlorobenzene 95501 1,200
1,2-Dichloroethane 107062 0.76
1,2-Dichloropropane 78875 1.04
1,2-Diphenylhydrazine 122667 0.08
1,2-Trans-Dichloroethylene 156605 20
1,3 Dichlorobenzene 541731 800
1,3-Dichloropropylene 542756 1
1,4 Dichlorobenzene 106467 40
2,3,7,8-TCDD (Dioxin) 1746016 0.000000026
2,4,6-Trichlorophenol 88062 4.2
2,4-Dichlorophenol 120832 186
2,4-Dimethylphenol 105679 1,080
2,4-Dinitrophenol 51285 140
2,4-Dinitrotoluene 121142 0.22
2-Chloronaphthalene 91587 3,400
2-Chlorophenol 95578 240
2-Methyl-4,6-Dinitrophenol 534521 26.8
3,3'-Dichlorobenzidine 91941 0.08
4,4'-DDD 72548 0.00166
4,4'-DDE 72559 0.00118
STATEWIDE GENERAL ORDER FOR DISCHARGES FROM ORDER WQ 2017-0029-DWQ NATURAL GAS UTILITY CONSTRUCTION, OPERATION NPDES NO. CAG670001

AND MAINTENANCE ACTIVITIES
APPENDIX 3-3
Constituent CAS Number Effluent Limitation
(µg/L)
4,4'-DDT 50293 0.00118
Acenaphthene 83329 2,400
Acrolein 107028 640
Acrylonitrile 107131 0.118
Aldrin 309002 0.00026
alpha-Endosulfan 959988 0.056 (Freshwater)

0.0087 (Saltwater)
Anthracene 120127 19,200
Antimony 7440360 12
Arsenic 7440382 150 (Freshwater)
36 (Saltwater)
Asbestos 1332214 14,000,000 (fibers/L)
Benzene 71432 2.0
Benzidine 92875 0.00024
Benzo(a)Anthracene 56553 0.0088
Benzo(a)Pyrene 50328 0.0088
Benzo(b)Fluoranthene 205992 0.0088
Benzo(k)Fluoranthene 207089 0.0088
beta-BHC 319857 0.028
beta-Endosulfan 33213659 0.056 (Freshwater)

0.0087 (Saltwater)
Bis(2-Chloroethoxy)Methane 111911 0
Bis(2-Chloroethyl)Ether 111444 0.062
Bis(2-ChloroisopropyI)Ether 39638329 2,800
Bis(2-Ethylhexyl)Phthalate 117817 3.6
Bromoform 75252 8.6
Butylbenzyl Phthalate 85687 6,000
Carbon Tetrachloride 56235 0.5
ChIorobenzene 108907 140
Chlordane 57749 0.00114
Chlorodibromomethane 124481 0.802
Chrysene 218019 0.0088
Cyanide 57125 5.2 (Freshwater)
1 (Saltwater)
Dibenzo(a,h)Anthracene 53703 0.0088
Dichlorobromomethane 75274 1.12
Dieldrin 60571 0.00028
Diethyl Phthalate 84662 46,000
Dimethyl Phthalate 131113 626,000
Di-n-Butyl Phthalate 84742 5,400
Endosulfan Sulfate 1031078 220
STATEWIDE GENERAL ORDER FOR DISCHARGES FROM ORDER WQ 2017-0029-DWQ NATURAL GAS UTILITY CONSTRUCTION, OPERATION NPDES NO. CAG670001

AND MAINTENANCE ACTIVITIES
APPENDIX 3-4
Constituent CAS Number Effluent Limitation
(µg/L)
Endrin 72208 0.036 (Freshwater)

0.0023 (Saltwater)
Endrin Aldehyde 7421934 1.52
Ethylbenzene 100414 6,200
Fluoranthene 206440 600
Fluorene 86737 2,600
gamma-BHC 58899 0.038
Heptachlor 76448 0.00042
Heptachlor Epoxide 1024573 0.0002
Hexachlorobenzene 118741 0.0015
Hexachlorobutadiene 87683 0.88
Hexachlorocyclopentadiene 77474 100
Hexachloroethane 67721 3.8
Indeno(1,2,3-cd) Pyrene 193395 0.0088
Isophorone 78591 16.8
alpha-BHC 319846 0.0078
alpha-Endosulfan 959988 220
Mercury 7439976 0.1
Methyl Bromide 74839 96
Methylene Chloride 75092 9.4
Nitrobenzene 98953 34
N-Nitrosodimethylamine 62759 0.00138
N-Nitrosodi-n-Propylamine 621647 0.01
N-Nitrosodiphenylamine 86306 10
Pentachlorophenol 87865 0.56
Phenol 108952 42,000
Polychlorinated biphenyls (PCBs) 1336-36-3 0.00034
Pyrene 129000 1920
Selenium 7782492 5.0 (Freshwater)
71 (Saltwater)
Tetrachloroethylene 127184 1.6
Thallium 7440280 3.4
Toluene 108883 300
Toxaphene 8001352 0.00146
Trichloroethylene 79016 5.4
Vinyl Chloride 75014 1.0
Table 4A. Final Effluent Limitations for Priority Pollutants Hardness-Dependent Metals with Hardness 0 to <40 mg/L
STATEWIDE GENERAL ORDER FOR DISCHARGES FROM ORDER WQ 2017-0029-DWQ NATURAL GAS UTILITY CONSTRUCTION, OPERATION NPDES NO. CAG670001

AND MAINTENANCE ACTIVITIES
APPENDIX 3-5
Parameter Unit
Hardness in mg/L
Maximum Daily Effluent Limitations
H <10 10≤ H <20 20≤ H <30 30≤ H <40
Cadmium, Total Recoverable µg/L 0.2 0.5 0.9 1.4
Chromium (III) µg/L 29 72 109 144
Copper, Total Recoverable µg/L 0.8 2.3 3.8 5.2
Lead, Total Recoverable µg/L 0.1 0.5 0.9 1.4
Nickel, Total Recoverable µg/L 7 17 27 35
Silver, Total Recoverable µg/L 0.02 0.2 0.4 0.7
Zinc, Total Recoverable µg/L 9 24 37 49
Table 4B. Final Effluent Limitations for Priority Pollutants Hardness-Dependent Metals with Hardness 40 to <80 mg/L
Parameter Unit
Hardness in mg/L
Maximum Daily Effluent Limitations
40≤ H <50 50≤ H <60 60≤ H <70 70≤ H <80
Cadmium, Total Recoverable µg/L 1.8 2.3 2.8 3.2
Chromium (III) µg/L 177 208 239 269
Copper, Total Recoverable µg/L 6.6 8.0 9.3 10.7
Lead, Total Recoverable µg/L 1.9 2.4 3.0 3.6
Nickel, Total Recoverable µg/L 44 52 59 67
Silver, Total Recoverable µg/L 1.0 1.4 1.9 2.5
Zinc, Total Recoverable µg/L 61 72 83 94
Table 4C. Final Effluent Limitations for Priority Pollutants Hardness-Dependent Metals with Hardness ≥80 mg/L
Parameter Unit
Hardness in mg/L
Maximum Daily Effluent Limitations
80≤ H <90 90≤ H <100 100≤ H <200 H ≥200
Cadmium, Total Recoverable µg/L 3.6 3.9 5.6 7.0
Chromium (III) µg/L 297 326 474 600
Copper, Total Recoverable µg/L 12 13 20 27
Lead, Total Recoverable µg/L 4.2 4.9 8.8 13
Nickel, Total Recoverable µg/L 75 82 121 154
Silver, Total Recoverable µg/L 3.1 3.7 8.1 13
Zinc, Total Recoverable µg/L 104 115 169 215
For saltwater discharges, this General Order sets the final effluent limitations for the metals shown in Table 5.

Table 5. Final Effluent Limitations for Protection of Aquatic Life for Saltwater Discharges
Constituent Effluent Limitation
(µg/L)
Cadmium, Total Recoverable 9.3
Copper, Total Recoverable 3.1
Lead, Total Recoverable 8.1
Nickel, Total Recoverable 8.2
STATEWIDE GENERAL ORDER FOR DISCHARGES FROM ORDER WQ 2017-0029-DWQ NATURAL GAS UTILITY CONSTRUCTION, OPERATION NPDES NO. CAG670001

AND MAINTENANCE ACTIVITIES
APPENDIX 3-6
Constituent Effluent Limitation
(µg/L)
Silver, Total Recoverable 1.9
Zinc, Total Recoverable 81
Final Effluent Limitations for Total Residual Chlorine
For all previously-chlorinated5 planned discharges directly into, or within 300 feet of, the receiving water, the total residual chlorine concentration shall not exceed the following limitations:
a. 0.011 mg/L, as a 4-day average.
b. 0.019 mg/L, as a 1-hour average.

A discharge is in compliance with the total residual chlorine effluent limitations if the total residual chlorine concentration measured by a handheld field chlorine meter is below a minimum level (quantifiable level) of 0.1 mg/L chlorine. See section X.B of this General Order for information to determine compliance with total residual chlorine effluent limitations.

B. Final Effluent Limitations for Discharges to the Pacific Ocean

1. Final Effluent Limitations for Priority Pollutants
Discharges to the Pacific Ocean shall not exceed the maximum daily effluent limitations (MDEL) specified in Table 6.

Table 6. Final Maximum Daily Effluent Limitations
Discharges of Priority Pollutants to the Pacific Ocean
Compound
Effluent
Concentration
(µg/L)
Averaging Period
Arsenic 32 MDEL
Cadmium 4 MDEL
Chlorinated Phenolics 4 MDEL
Chromium (Hexavalent)1 8 MDEL
Copper 12 MDEL
Cyanide2 4 MDEL
Endosulfan 0.018 MDEL
Endrin 0.004 MDEL
Hexachlorocyclohexane3 0.008 MDEL
Lead 8 MDEL
Mercury 0.16 MDEL
Nickel 20 MDEL
Selenium 60 MDEL
Silver 2.8 MDEL
Total Chlorine Residual 8 MDEL
Zinc 80 MDEL
1 Dischargers may, at their option, meet this objective as a total chromium objective.

5 For example, treated potable water, recycled water, etc.

STATEWIDE GENERAL ORDER FOR DISCHARGES FROM ORDER WQ 2017-0029-DWQ NATURAL GAS UTILITY CONSTRUCTION, OPERATION NPDES NO. CAG670001

AND MAINTENANCE ACTIVITIES
APPENDIX 3-7
2 Requirement may be met by measurement of weak acid-dissociable cyanide (SM 4500-CN-I-1999) or measurement of “available” cyanide species using an approved method in 40 C.F.R. part 136.
3 Hexachlorocyclohexane shall mean the sum of the alpha, beta, gamma (lindane) and
delta isomers of hexachlorocyclohexane.

Discharges to the Pacific Ocean shall not exceed the average monthly effluent limitations (AMEL) specified in Table 7.

Table 7. Final Average Monthly Effluent Limitations
Discharges of Priority Pollutants to the Pacific Ocean
Compound
Effluent
Concentration
(µg/L)
Averaging
Period
1,1,1-Trichloroethane 540000 AMEL
1,1,2,2-Tetrachloroethane 2.3 AMEL
1,1,2-Trichloroethane 9.4 AMEL
1,1-Dichloroethylene 0.9 AMEL
1,2-Dichloroethane 28 AMEL
1,2-Diphenylhydrazine 0.16 AMEL
1,3-Dichloropropene 8.9 AMEL
1,4-Dichlorobenzene 18 AMEL
2,4,6-Trichlorophenol 0.29 AMEL
2,4-Dinitrophenol 4 AMEL
2,4-Dinitrotoluene 2.6 AMEL
3,3’-Dichlorobenzidine 0.0081 AMEL
4,6-Dinitro-2-methylphenol 220 AMEL
Acrolein 220 AMEL
Acrylonitrile 0.1 AMEL
Aldrin 0.000022 AMEL
Antimony 1200 AMEL
Benzene 5.9 AMEL
Benzidine 0.000069 AMEL
Beryllium 0.033 AMEL
Bis(2-chloroethoxy)
methane 4.4 AMEL
Bis(2-chloroethyl) ether 0.045 AMEL
Bis(2-chloroisopropyl) ether 1200 AMEL
Bis(2-ethylhexyl) phthalate 3.5 AMEL
Carbon tetrachloride 0.9 AMEL
Chlordane 0.000023 AMEL
Chlorobenzene 570 AMEL
Chlorodibromomethane 8.6 AMEL
Chloroform 130 AMEL
STATEWIDE GENERAL ORDER FOR DISCHARGES FROM ORDER WQ 2017-0029-DWQ NATURAL GAS UTILITY CONSTRUCTION, OPERATION NPDES NO. CAG670001

AND MAINTENANCE ACTIVITIES
APPENDIX 3-8
Compound
Effluent
Concentration
(µg/L)
Averaging
Period
DDT 0.00017 AMEL
Dichlorobenzene 5100 AMEL
Dichlorobromomethane 6.2 AMEL
Dichloromethane 450 AMEL
Dieldrin 0.00004 AMEL
Diethyl phthalate 33000 AMEL
Dimethyl phthalate 820000 AMEL
Di-N-butyl phthalate 3500 AMEL
Ethylbenzene 4100 AMEL
Fluoranthene 15 AMEL
Halomethanes 130 AMEL
Heptachlor 0.00005 AMEL
Heptachlor epoxide 0.00002 AMEL
Hexachlorobenzene 0.00021 AMEL
Hexachlorobutadiene 14 AMEL
Hexachlorocyclopentadiene 58 AMEL
Hexachloroethane 2.5 AMEL
Isophorone 730 AMEL
Nitrobenzene 4.9 AMEL
N-nitrosodimethylamine 7.3 AMEL
N-nitrosodi-N-propylamine 0.38 AMEL
N-nitrosodiphenylamine 2.5 AMEL
PAHs 0.0088 AMEL
PCBs 0.000019 AMEL
TCDD equivalents 3.9E-09 AMEL
Tetrachloroethylene 2 AMEL
Thallium 2 AMEL
Toluene 85000 AMEL
Toxaphene 0.00021 AMEL
Tributyltin 0.0014 AMEL
Trichloroethylene 27 AMEL
Vinyl Chloride 36 AMEL

2. Final Effluent Limitations for Chlorine
For all previously-chlorinated5 planned discharges directly into, or within 300 feet of ocean water, the total residual chlorine concentration in the discharge shall not exceed the following limitations:
a. 0.008 mg/L, as a daily maximum.
b. 0.060 mg/L, as an instantaneous maximum.

STATEWIDE GENERAL ORDER FOR DISCHARGES FROM ORDER WQ 2017-0029-DWQ NATURAL GAS UTILITY CONSTRUCTION, OPERATION NPDES NO. CAG670001

AND MAINTENANCE ACTIVITIES
APPENDIX 3-9
A discharge is in compliance with the total residual chlorine effluent limitations if the total residual chlorine concentration measured by a handheld field chlorine meter is below a minimum level (quantifiable level) of 0.1 mg/L chlorine. See section X.B of this Order for information to determine compliance with total residual chlorine effluent limitations.
• Final Effluent Limitations for Hydrostatic Testing Discharges from Existing Facilities
The pollutant concentrations of Total Petroleum Hydrocarbons as Diesel in the discharge shall not exceed 2.0 mg/L.

The pollutant concentrations of Total Petroleum Hydrocarbons as Gasoline in the discharge shall not exceed 5.0 µg/L.

A discharge is in compliance with the Total Petroleum Hydrocarbons as Gasoline effluent limitation if the laboratory analytical monitoring result is “non-detect” using a U.S. EPA authorized laboratory analytical method with a method detection limit of 23 µg/L or lower.
• Final Effluent Limitations for All Discharges
Oil and grease shall not exceed 10 mg/L.

Turbidity shall not exceed 50 Nephelometric Turbidity Units. pH in the discharge shall be within 6.0 to 9.0 standard units.

FINAL EFFLUENT LIMITATIONS FOR PLANNED DISCHARGES TO NON-FEDERAL

SURFACE WATER
Discharges to non-federal surface waters shall not exceed any effluent limitation for discharges established in section V of this General Order for waters of the U.S.

THIS PAGE INTENTIONALLY LEFT BLANK

MEMORANDUM
Council Meeting Date: May 28, 2024
To: Honorable Mayor and City Council
From: Michael Ramirez, City Manager
Subject: City Manager's Report

SENIOR SERVICES PROGRAMMING (AGEWELL)
Pickleball
Pickleball is coming to AgeWell for the summer! Starting in June. AgeWell will take over the pickleball courts, located at the middle school, Wednesday and Friday mornings from 8:00am to 1 0:00am. Wednesdays are set aside for beginners to learn from a skilled instructor, and Friday is "game on" for some AgeWell pickleball fun.

CITY EMPLOYEE UPDATES
Recruitments
Below is a partial list of open recruitments and status. Additional information on City job openings is available online at https://carpinteriaca.gov/city-hall/human-resources/ • Library Technician
o Final interviews conducted on May 23
o Selection pending background
• Parks and Facilities Attendant
o Recruitment ongoing
• Part-time Lifeguard (Summer Seasonal) and Swim Coach Positions o See website for details

UPDATES ON CAPITAL IMPROVEMENT PROJECTS
No updates

UPDATES ON DEVELOPMENT APPLICATIONS
The Palms Restaurant Renovations to be Reviewed by Architectural Review Board
On Thursday, May 30th, the Carpinteria Architectural Review Board (ARB) will be holding a conceptual review of the proposed renovations for the historic Palms Restaurant building located at 701 Linden Avenue. The property changed ownership over the past year and the new owner is taking early steps to share a conceptual proposal for the building with the City's ARB. The contemplated use of the building would include a ground floor restaurant and market/cafe/retail area; a second-floor banquet/event space; and rooftop covered bar and uncovered dining area. The project would also include efforts to restore historic building facades, including the removal and replacement of the ground floor single story element along Linden Avenue with a trellised patio seating area, and restoration of original windows and openings. The meeting will take place at 5:30 p.m. in the City Hall Council Chambers. The meeting agenda and staff report will be posted to the City's website no later than Thursday, May 23rd here: https://carpinteriaca.gov/city-hall/agendas-meetings/

OTHER CITY/COMMUNITY UPDATES
Draft Density Bonus Ordinance to be Reviewed by Planning Commission The Carpinteria Planning Commission is scheduled to review the proposed amendments to the City's Zoning Code (CMG Title 14) pertaining to chapter 14.77, Density Bonus Regulations. The proposed amendments are intended to update the City's Density Bonus regulations to conform to current state law. The Planning Commission is asked to review and make a recommendation to the City Council for approval along with any suggested changes or revisions. The hearing will take place at 5:30 p.m. on Monday, June 3rd in the City Hall Council Chambers. The meeting agenda and staff report will be posted to the City's website no later than Thursday, May 30th here: https://carpinteriaca.gov/city-hall/agendas-meetings/ Adult Softball
The Carpinteria Adult Softball Co-Ed League kicks off on Thursday, June 6th. Games will take place at Viola Fields on Tuesdays and Thursdays at 5:40pm. The league fees are $350 per team, including 8-10 games plus the End of Season single elimination tournament. Reynaldo Cardenas continues to lead this program. Interested players should contact Reynaldo directly at (805) 453-2089. Registration closes May 31st.

Summer Reading
The Carpinteria Community Library Summer Reading program begins June 10. The program runs through August 16 and is open to readers of all ages. Call (805-6844314) or visit the Library website (carpinterialibrary.org) for more information. Library staff are excited to introduce everyone to some interesting insects through books, projects, art, and presentations. It's going to be the bees knees!
City of Carpinteria
City Council Minutes
Regular Meeting
Monday, May 13, 2024
In-Person and Virtual

CALL TO ORDER
Mayor Clark called the meeting to order at 4:31 pm.

ROLL CALL
Councilmembers present: Councilmember Roy Lee
Councilmember Mónica J. Solórzano
Councilmember Wade T. Nomura
Vice Mayor Natalia Alarcon
Mayor Al Clark
Staff members present: Michael Ramirez, City Manager
Ryan Kintz, Assistant City Manager
Jena Shoaf Acos, on behalf of Brownstein Hyatt Farber
Schreck, LLP acting as City Attorney of the City
of Carpinteria
Brian C. Barrett, City Clerk

PUBLIC COMMENT ON CLOSED SESSION MATTERS
There was no public comment.

CLOSED SESSION

1. CLOSED SESSION: CONFERENCE WITH REAL PROPERTY NEGOTIATORS Government Code section 54956.8
Property: 801 Linden Avenue, Carpinteria CA 93013
Agency negotiator: City Manager Michael Ramirez
(If circumstances necessitate the absence of a specified negotiator, an agent or designee may participate in place of the absent negotiator so long as the name of the agent or designee is announced at an open session held prior to the closed session.)
Negotiating parties: None
Under negotiation: Price and Terms of Payment
Agenda Item No. 4
City Council Regular Meeting Minutes
May 13, 2024

Page 2 ends

Legal Counsel Acos read aloud for the record the Closed Session Item, the real property concerning the negotiations, the City’s negotiators, and the negotiating parties.

TEMPORARY ADJOURNMENT TO CLOSED SESSION
Mayor Clark temporarily adjourned the meeting to Closed Session at 4:33 pm.

CALL TO ORDER
Mayor Clark called the meeting to order at 5:32 pm.

ROLL CALL
Councilmembers present: Councilmember Roy Lee
Councilmember Mónica J. Solórzano
Councilmember Wade T. Nomura
Vice Mayor Natalia Alarcon
Mayor Al Clark
Staff members present: Michael Ramirez, City Manager
Jena Shoaf Acos, on behalf of Brownstein Hyatt Farber
Schreck, LLP acting as City Attorney of the City
of Carpinteria
Brian C. Barrett, City Clerk
John L. Ilasin, Public Works Director
Robert Howard, Public Works Supervisor
Ryan Kintz, Assistant City Manager
Kalyn Pina, Aquatics Coordinator
Jena Jenkins, Senior Services Coordinator
Amy Stanfield, Recreation Leader
Stephon Downes, Management Analyst I
Olivia Uribe Mutal, Program Manager
Mindy Fogg, Principal Planner
Jody Thomas, City Librarian

CLOSED SESSION REPORT
Legal Counsel Acos announced that there was no reportable action from the Closed Session.

PLEDGE OF ALLEGIANCE
Mayor Clark led those present in the salute to the flag.

COUNCILMEMBER(S) REQUEST FOR REMOTE PARTICIPATION UNDER AB 2449:

City Council Regular Meeting Minutes
May 13, 2024

Page 3 ends

There were no Councilmember requests for remote participation under AB 2449.

AGENDA MODIFICATIONS: NONE
INTRODUCTIONS, PROCLAMATIONS AND PRESENTATIONS:

2. Proclamation proclaiming May as Asian American & Pacific Islander Heritage Month in the City of Carpinteria. (Requires approval prior to presentation of proclamation.)
There was no public comment.

Motion by Councilmember Nomura, seconded by Councilmember Solórzano, to approve the Proclamation proclaiming May as Asian American & Pacific Islander Heritage Month in the City of Carpinteria. Upon voice vote, the motion carried unanimously.

Mayor Clark and the City Council presented the proclamation to Libby Lok with the Santa Barbara Asian American and Pacific Islander Solidarity Network, who provided remarks.

3. Proclamation Designating May 2024 as Community Action Month and on the Occasion of CommUnify’s 57th Anniversary. (Requires approval prior to presentation of proclamation.)
Vice Mayor Alarcon recused herself from this item due to CommUnify being her employer and left the Council Chambers at 5:43 pm.

There was no public comment.

Motion by Councilmember Nomura, seconded by Councilmember Solórzano, to approve the Proclamation Designating May 2024 as Community Action Month and on the Occasion of CommUnify’s 57th Anniversary. Upon voice vote, the motion carried unanimously with Vice Mayor Alarcon absent due to her recusal.

Mayor Clark and the City Council presented the proclamation to Patricia Keelean, Chief Executive Officer of CommUnify, who provided remarks.

Vice Mayor Alarcon returned to the dais at 5:50 pm.

4. Proclamation Designating May 19 through 25, 2024, as National Public Works Week in the City of Carpinteria. (Requires approval prior to the presentation of proclamation.)
There was no public comment.

City Council Regular Meeting Minutes
May 13, 2024

Page 4 ends

Motion by Councilmember Nomura, seconded by Councilmember Solórzano, to approve the Proclamation Designating May 19 through 25, 2024, as National Public Works Week in the City of Carpinteria. Upon voice vote, the motion carried unanimously.

Mayor Clark and the City Council presented the Proclamation to Public Works staff.

Public Works Director Ilasin and Public Works Supervisor Howard provided remarks.

5. New Employee Introduction: Ryan Kintz, Assistant City Manager; Kalyn Pina, Aquatics Coordinator; Jena Jenkins, Senior Services Coordinator; and Amy Stanfield, Recreation Leader.

City Manager Ramirez introduced Kalyn Pina, Aquatics Coordinator; Jena Jenkins, Senior Services Coordinator; Amy Stanfield, Recreation Leader; and Ryan Kintz, Assistant City Manager.

TEMPORARY ADJOURNMENT FOR THE PURPOSE OF HOLDING THE MONTHLY

MEETING OF THE CARPINTERIA LIBRARY BOARD OF TRUSTEES
Mayor Clark temporarily adjourned the meeting at 6:02 pm.

RECONVENE THE REGULAR MEETING OF THE CITY COUNCIL
Mayor Clark reconvened the meeting at 6:17 pm.

PUBLIC INFORMATION REPORTS AND ANNOUNCEMENTS
Lieutenant Butch Arnoldi with the Santa Barbara County Sheriff’s Department provided an update on crime in the City.

CITY MANAGER’S REPORT
a. Senior Services Programming
City Manager Ramirez reported on Saturday Excursions and Senior Lecture Series provided by the Senior Services Program.
b. City Employee Updates
City Manager Ramirez summarized City Employee Updates.
c. Updates on Capital Improvement Projects
None.
d. Updates on Development Applications
City Council Regular Meeting Minutes
May 13, 2024

Page 5 ends

None.
e. Other City/Community Updates
City Manager Ramirez reported on Adult Softball, Household Goods and Hazardous Waste Day, Carpinteria Bluffs Restoration, and CycleMAYnia Carpinteria Group Loop Ride.

Principal Planner Fogg mentioned the County of Santa Barbara Housing Element Rezones and the City’s General Plan Annual Progress Report Follow-Up.

Speakers in-person: Patrick O’Connor
PLANNING COMMISSION ACTIONS: NONE

PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA
Speakers in-person: Larry Nimmer, Gail Marshall, Amrita Salm representing herself, Rogelio Delgado, and Amrita Salm representing HopeNet of Carpinteria Speakers via Zoom: Gary Campopiano and Susan Allen
In response to comments from Ms. Marshall and Ms. Salm, there was Council consensus to direct staff to place a presentation by Our Neighborhood Voices on the June 10th regular City Council meeting agenda.

There was a brief discussion regarding Mr. Nimmer’s comment about potentially cutting from the budget the cost of videorecording City and community events. City Manager Ramirez added that the Council will have an opportunity to look at its draft budget at its June 10th meeting. Vice Mayor Alarcon requested that staff highlight the services that are being cut at the June 10th budget presentation. City Manager Ramirez acknowledged that staff would present Mr. Nimmer’s comment in more detail and present the items that are proposed for reduction/deferment at the June 10th budget presentation.

CONSENT CALENDAR:

Speakers in-person: Sandy Evans representing Carpinteria Senior Citizens, Inc.

Motion by Councilmember Solórzano, seconded by Councilmember Nomura, to approve the Consent Calendar Item Nos. 6 through 8. The roll call vote on the motion was as follows:

AYES: Councilmember Lee, Councilmember Nomura, Councilmember Solórzano, Vice Mayor Alarcon, and Mayor Clark
City Council Regular Meeting Minutes
May 13, 2024

Page 6 ends

NOES: None
ABSENT: None
ABSTAIN: None
The motion carried unanimously.

6. Approve the minutes of the regular meeting held April 22, 2024 and the special meeting held April 26, 2024.

7. Receive and file the Expenditures for the period beginning April 15, 2024 and ending May 3, 2024.

8. Approve additional appropriations through the Community Services Support Grant program (CSSG) for the current fiscal year (FY) 2023-2024 totaling $19,000. (This motion requires a roll call vote.)
ADMINISTRATIVE MATTERS:

9. Rental of Street Sweeping Equipment.

Recommendation: (1) Authorize the City Manager to execute a rental agreement with Haaker Equipment Company for street sweeping equipment in an amount not to exceed $70,700; (2) Appropriate $70,700 for rental of street sweeping equipment and maintenance; and (3) Appropriate $8,000 for maintenance of street sweeping equipment. (This motion requires a roll call vote.) Management Analyst I Downes presented the staff report.

Speakers in-person: Patrick O’Connor and RT Picard
Motion by Councilmember Lee, seconded by Councilmember Nomura, to authorize the City Manager to execute a rental agreement with Haaker Equipment Company for street sweeping equipment in an amount not to exceed $70,700 and appropriate $78,700 for rental of street sweeping equipment and maintenance.

Councilmember Nomura requested modification to the motion to include the time extension of the rental agreement through October 2024 due to the delay in delivery of the City’s street sweeper.

Councilmember Lee modified the motion to authorize the City Manager to execute a rental agreement with Haaker Equipment Company for street sweeping equipment in an amount not to exceed $70,700 and appropriate $78,700 for rental of street sweeping equipment and maintenance and include the time extension of the rental agreement through October 2024 due to the delay in delivery of the City’s street sweeper. Councilmember Nomura seconded the modified motion. The roll call vote on the modified motion was as follows:

City Council Regular Meeting Minutes
May 13, 2024

Page 7 ends

AYES: Councilmember Lee, Councilmember Nomura, Councilmember Solórzano, Vice Mayor Alarcon, and Mayor Clark
NOES: None
ABSENT: None
ABSTAIN: None
The motion carried unanimously.

10. Approval of the Agreement between the City of Carpinteria and Two Trumpets Communications for Public Outreach Services and Communications Support.

Recommendation: Approve the Agreement between the City of Carpinteria and Two Trumpets Communications for Public Outreach Services and Communications Support. (This motion requires a roll call vote.) Program Manager Uribe Mutal provided the staff report.

Speakers in-person: Lea Boyd and Peter Dugré both representing Two Trumpets Communications
Motion by Councilmember Solórzano, seconded by Councilmember Nomura, to authorize the City Manager to sign an agreement between the City of Carpinteria and Two Trumpets Communications for Public Outreach Services and Communications Support. The roll call vote on the motion was as follows:

AYES: Councilmember Lee, Councilmember Nomura, Councilmember Solórzano, Vice Mayor Alarcon, and Mayor Clark
NOES: None
ABSENT: None
ABSTAIN: None
The motion carried unanimously.

Mayor Clark recessed to a break at 7:26 pm and reconvened the meeting at 7:35 pm.

11. Authorization to Renew an Agreement for Rental Housing Mediation Program services between the City of Carpinteria and the City of Santa Barbara for the period from July 1, 2024 to June 30, 2027, for a flat fee of $78,813 for the threeyear term of this agreement.

Recommendation: Authorize the City Manager to execute an agreement for Rental Housing Mediation Program services for the period from July 1, 2024 to June 30, 2027, for a flat fee of $78,813 for the three-year term of the agreement. (This motion requires a roll call vote.)
City Council Regular Meeting Minutes
May 13, 2024

Page 8 ends

Principal Planner Fogg presented the staff report in conjunction with Andrea Bifano, Rental Housing Mediation Supervisor with the City of Santa Barbara and Laura Dubbels, Housing & Human Services Manager with the City of Santa Barbara.

There was no public comment.

Motion by Vice Mayor Alarcon, seconded by Councilmember Nomura, to authorize the City Manager to sign the Agreement for Rental Housing Mediation Program services for the period from July 1, 2024 to June 30, 2027, for a flat fee of $78,813 for the three-year term of the agreement. The roll call vote on the motion was as follows:

AYES: Councilmember Lee, Councilmember Nomura, Councilmember Solórzano, Vice Mayor Alarcon, and Mayor Clark
NOES: None
ABSENT: None
ABSTAIN: None
The motion carried unanimously.

12. Receive and file letter of resignation of District 3 Councilmember Roy Lee and determine Process for Filling City Council Vacancy.

Recommendation: Council to receive and file letter of resignation of District 3 Councilmember Roy Lee and provide direction to staff with respect to this seat.

Per the attached letter of resignation, the effective date of Councilmember Roy Lee’s resignation is December 9, 2024. The Council may fill the seat either by appointment or a special election that would be consolidated with the General Municipal Election on November 5, 2024. If the Council chooses to fill the seat by appointment, the matter will be brought back at a future undetermined date; if it chooses special election, staff will include the District 3 seat to the list of candidate seats to be consolidated with the General Municipal and Statewide Elections that are to occur on November 5, 2024. Staff expects to bring these resolutions back for Council consideration at its next meeting.

Councilmember Lee recused himself to avoid a perception of bias and left the Council Chambers at 7:44 pm.

City Clerk Barrett provided the staff report.

Speakers in-person: Rogelio Delgado
Motion by Councilmember Nomura, seconded by Vice Mayor Alarcon, to receive and file the letter of resignation of District 3 Councilmember Roy Lee and direct staff to include City Council Regular Meeting Minutes
May 13, 2024

Page 9 ends

the District 3 seat to the list of candidate seats to be consolidated with the General Municipal and Statewide Elections to occur on November 5, 2024.

Councilmember Nomura modified the motion to receive and file the letter of resignation of District 3 Councilmember Roy Lee and direct staff to include the District 3 seat which will cover the remaining two years of Councilmember Lee’s term to the list of candidate seats to be consolidated with the General Municipal and Statewide Elections to occur on November 5, 2024. Vice Mayor Alarcon seconded the modified motion. Upon voice vote, the modified motion carried unanimously with Councilmember Lee absent due to his recusal.

Councilmember Lee returned to the dais at 7:52 pm.

PUBLIC HEARING: NONE

CONSIDERATION OF ANY ITEMS REMOVED FROM CONSENT CALENDAR AND/OR OTHER AGENDA ITEMS REQUESTED TO BE ADVANCED: NONE MATTERS CONTINUED FROM PREVIOUS MEETINGS: NONE
OTHER BUSINESS:

13. Ordinance No. 782, an Ordinance of the City Council, of the City of Carpinteria, California, amending Chapter 2.37 of the Carpinteria Municipal Code to modify the composition of the Carpinteria Community Library Advisory Commission and align reporting requirements with State law.

Recommendation: Approve Ordinance No. 782, as read by title only (first reading). (This motion requires reading of ordinance title and a roll call vote.) City Librarian Thomas presented the staff report and presentation and noted Ordinance No. 782 had been modified since the posting of the agenda packet to include adding the City Representative to the Santa Barbara County Library Advisory Committee be invited to the Carpinteria Community Library Advisory Commission regular meetings.

There was no public comment.

Motion by Councilmember Solórzano, seconded by Councilmember Nomura, to approve Ordinance No. 782, on first reading, as read by title only, and continue second reading for adoption to May 28, 2024.

City Clerk Barrett read aloud the ordinance title into the record.

The roll call vote on the motion was as follows:

City Council Regular Meeting Minutes
May 13, 2024

Page 10 ends

AYES: Councilmember Lee, Councilmember Nomura, Councilmember Solórzano, Vice Mayor Alarcon, and Mayor Clark
NOES: None
ABSENT: None
ABSTAIN: None
The motion carried unanimously.

14. 2024 Community Promotions and Communications Program Report.

Recommendation: Receive and file the 2024 Community Promotions and Communications Program Report.

Program Manager Uribe Mutal and Lea Boyd representing Two Trumpets Communications presented the staff report and PowerPoint presentations.

Speakers in-person: Fred Shaw and Rogelio Delgado
Program Manager Uribe Mutal asked for Council feedback on subsequent outreach event themes, date range, location, and survey or other data to be collected.

Vice Mayor Alarcon suggested the City have a booth at the St. Joseph’s Fair to increase the City newsletter subscriptions; leverage the National Night Out event; and hold an event where the community can sit down at a long table for dinner, similar to the City of Goleta’s Dam Dinner event.

Councilmember Solórzano suggested potential outreach event themes of volunteering in Carpinteria, housing support and resources, environmental stewardship, and disaster preparedness. She suggested potential event dates could be in Fall during back to school time and potential locations could include Linden Field, Linden Plaza, Memorial Park or El Carro Park.

Councilmember Lee concurred with the provided suggestions and recommended that each Councilmember reach out to the community and be available and accessible.

Motion by Councilmember Nomura, seconded by Vice Mayor Alarcon, to receive and file the 2024 Community Promotions and Communications Program Report and include Councilmember suggestions. Upon voice vote, the motion carried unanimously.

LEGISLATIVE UPDATE: NONE

COMMITTEE REPORTS, INQUIRIES AND OTHER MATTERS PRESENTED BY

COUNCILMEMBERS
City Council Regular Meeting Minutes
May 13, 2024

Page 11 ends

Councilmember Solórzano reported on her attendance at the Santa Barbara Metropolitan Transit District Board meeting last week where the FY 24-25 service plan was approved and they reviewed the FY 23-24 third quarter fiscal activity. She also related that BEACON would be meeting this Friday morning; the City’s Sustainability Committee will meet tomorrow morning; and the Harbor Seal Advisory Committee will meet on May 22nd.

ATTENDANCE OF COUNCILMEMBERS FOR FUTURE MEETINGS
All Councilmembers are expected to be in attendance at the May 28th regular City Council meeting.

Councilmember Nomura announced that former Mayor Richard “Dick” Weinberg had passed away and requested that the meeting be adjourned in his memory.

ADJOURNMENT
Mayor Clark adjourned the meeting in memory of former Mayor Richard “Dick” Weinberg at 8:38 pm.
__________________________
Al Clark, Mayor
ATTEST:
____________________________
Brian C. Barrett, CMC, CPMC
City Clerk
City of Carpinteria

COUNCIL AGENDA STAFF REPORT
May 28, 2024

ITEM FOR COUNCIL CONSIDERATION
Expenditures for the period beginning May 6, 2024 and ending May 17, 2024.

STAFF RECOMMENDATION
Receive and file Warrant Register for the period of May 6, 2024, through May 17, 2024, pursuant to Carpinteria Municipal Code 2.08.150(F).

DISCUSSION
As part of each regular City Council agenda, a list of all checks (attached) dispersed since the last reporting period is presented to the City Council pursuant to C.M.C.

2.08.150(F). The report is provided for City Council and public information and serves as staff's verification that the expenditures have been reviewed and are within budgeted appropriations.

FINANCIAL CONSIDERATIONS
The warrant register is designed to communicate fiscal activity since the prior reporting period.

ATTACHMENTS
Attachment A: Warrant Register for the period beginning May 6, 2024 and ending May 17, 2024.

Agenda Item No. 5
Warrant Register
May 28, 2024
Page #2
Staff contact: Brenda Robinson, Accounting Specialist f2.Ji~f7 A '_ (805) 755-4442, [email protected] f_J_}jjfjfl,
S
~
ignature
Staff contact: Licette Maldonado, Admin Services Dir
(805) 755-4448, [email protected]
Reviewed by: Michael Ramirez, City Manager
(805) 755-4450, [email protected]
G:\Admin Services\Staff Report\Staff Report AP.docx
Warrant Register
Carpinteria, CA
Date Range: 05/06/2024 - 05/17/2024
Vendor Number
Payable#
Bank Code: AP Bank-AP Bank
Payment Type: Regular
CARP CITY APR24 SERVICE
CARP CITY MAR24 SERVICE
11HP-NHY9-FQKP
13LR-P33G-DKMX
13LX-9DJP-GDWT
13QG-M7JK-PNCV
14DN-XGRD-FGND
14DN-XGRD-HRX7
17YL-W7DR-4YCH
196K-TTFN-7PFP
19TC-1JRL-1W1K
19TC-1JRL-YTYP
19Y6-34JC-KX74
1C7F-L3F3-DLGF
1CQL-77Y6-1LT1
1D1R-1PN7-FFW3
1DTD-PW3C-HXH N
1F4T-37Y9-3MFY
1GCT-37FX-HRQJ
1GM3-PR1 V-KMLP
lHNH-FMYY-GGGV
1K13-KGMJ-WJ4Y
1K3K-6YMC-FHCP
1UG-FKV4-196R
1UG-FKV4-GPPH
1LYL-JJFQ-KQN7
1NKG-79DY-CN3P
1NXH-7X6M-CNCG
1PMD-9X7P-DHKJ
1PTH-7NFY-1FTR
1QHQ-1QQW-1FN4
lQLD-JGPR-XLTH
1R47-LYVV-H7WK
1 TMV-X9WP-4RGY
1W76-X6Y7-GCJN
1 WWW-4WYK-HW9V
Vendor Name
Payable Type

CARPINTERIA VALLEY WATER DISTRICT
Invoice
Invoice

ADVANTAGE TELECOM
Invoice

AMAZON CAPITAL SERVICES INC
Credit Memo
Credit Memo
Credit Memo
Invoice
Credit Memo
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Credit Memo
Invoice
Invoice
Invoice
Invoice
Invoice
Credit Memo
Invoice
Invoice
Invoice
**Void**
**Void**
Payment Date Payment Amount Number
Payable Description
05/06/2024
APR24-WATER FOR MULTIPLE LOCATIONS
MAR24-WATER FOR MULTIPLE LOCATIONS
05/09/2024
MAY24 EMERGENCY PHONE LINE SERVICES
30664.29 103555

69.99 103556
05/09/2024 1881.66 103557

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

PHARMACOLOGY INDEX CARDS FOR LIBRARY PROGRAM

TONER FOR PRINTER

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

PLUG IN SPEAKERS FOR PC

STANDING DESK MAT,HEADSET FOR PC,MOUSE AND PAD

DECK OF CARDS FOR LIBRARY PROGRAM

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

CARD & BOARD GAMES FOR LIBRARY

BOOKS FOR LIBRARY

LAMP BULB REPLACEMENT FOR PROJECTOR

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BATTERIES, BUG STAMPS,CRAFT ADHESIVE FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

ANIMAL MEDICAL CLINIC
05/09/2024
05/09/2024
05/09/2024
0 103558
0 103559
3611.7 103560
558522 Invoice MAR24 EMERGENCY OUT OF CONTRACT VET SERVICES 558890 Invoice MAR24 EMERGENCY OUT OF CONTRACT VET SERVICES 559168 Invoice MAR24 DOG LICENSING ISSUANCE
559169 Invoice MAR24 CONTRATCED VET SERVICES
559362 Invoice APR24 EMERGENCY OUT OF CONTRACT VET SERVICES 559436 Invoice APR24 EMERGENCY OUT OF CONTRACT VET SERVICES 559684 Invoice APR24 EMERGENCY OUT OF CONTRACT VET SERVICES 559743 Invoice APR24 EMERGENCY OUT OF CONTRACT VET SERVICES 560131 Invoice APR24 CONTRACTED VET SERVICES
560132 Invoice APR24 DOG LICENSING ISSUANCE

Page 1 ends

BACKGROUNDS ONLINE
Invoice
05/09/2024 488.05 103561
APR24 PROFESSIONAL SERVICES
BARTON MYERS ASSOC INC 05/09/2024 7608.01 103562
INV0005645
INV0005656
INV0005657
Invoice
Invoice
Invoice
PROJECT CLOSEO UT PL-15-1777
PROJECT CLOSEO UT PL-20-2059
PROJECT CLOSEO UT PL-17-1899
BLACK GOLD COOPER ATIVE LIBRARY SYSTEM 05/09/2024
Invoice FY23-24 Q3 REIMBURSABLE HOOPLA & HOTSPOTS
INV0005649

BRIGHT EVENT RENTALS
Invoice

CARPINTERIA BUSINESS PARK PARTNERS
INV0005709 Invoice PROJECT CLOSEOUT PL-18-1940

CARPINTERIA SANITARY DISTRICT
INV0005616
INV0005618
Invoice
Invoice
PROJECT CLOSEOUT PL-15-1766
PROJECT CLOSEOUT PL-15-1802
CARPINTERIA VALLEY HISTORICAL SOCIETY 05/09/2024
INV0005661 Invoice PROJECT CLOSEOUT PL-21-2094
CARPINTERIA VALLEY LUMBER CO 05/09/2024
Invoice HOSE FOR VETS COURTYARD
INV0005648
CHEVRON U.S.A. INC
Invoice
INV0005697
777460
777477
777617
Invoice
Invoice
61092
61127
61130
61131

COASTAL VIEW NEWS
Invoice
Invoice
Invoice
Invoice
PROJECT CLOSEOUT PL-19-1975
PROJECT CLOSEOUT PL-20-2047
CLEAN HARBORS ENVIRONMENTAL SERVICES 05/09/2024
Invoice BATTERY PACKING & uw SHIPMENT 3/29/24
COAST AUTO PARTS INC 05/09/2024
Invoice MOTOR OIL FOR FLEET MAINTENANCE 4/23/24
OIL FOR UNIT 120
MOTOR OIL,FILTER, WASHER FLUID FOR UNIT 121
05/09/2024
CARPINTERIA COMMUNITY CLEANUP DAY AD 4/14/24
HHWD 1/2 PAGE AD 4/25/24
VIA REAL STORMWATER PROJECT AD 4/25/24
SUMMARY OF ADOPTED ORDINANCE AD 4/25/24

COORDINATED SIGN SYSTEMS
INV0005706 Invoice
MAY24 001 3011022093901
MAY24 0013011028030701
INV0005711

COX BUSINESS
Invoice
Invoice

DAVE MOORE
Invoice
PROJECT CLOSEOUT PL-20-2051
05/09/2024
MAY24 CITY HALL INTERNET-PHONE SERVICES
MAY24 POOL & GARDEN INTERNET-PHONE SERVICE
05/09/2024
PROJECT CLOSEOUT PL-16-1812
EVERSHADE EXTERIOR CLEANING SOLUTIONS 05/09/2024
Invoice

FIRST NATIONAL BANK OF OMAHA
05/09/2024
05/09/2024
05/09/2024
05/09/2024
05/09/2024
05/09/2024
APR24 0983
APR24 3498
APR24 3696
APR24 6160
APR24 9341
Invoice
Invoice
Invoice
Invoice
Invoice

CREDIT CARD PAYMENT-OUM
CREDIT CARD PAYMENT-ff

CREDIT CARD PAYMENT-LM

CREDIT CARD PAYMENT-JI

CREDIT CARD PAYMENT-MR
FRONTIER COMMUNICATIONS 05/09/2024
MAY24 209-188-2500-061589-5 Invoice
MAY24 805-566-3374-042524-5 Invoice
150015901

GRACE NOTE
Invoice
9100409672

GRAINGER
Invoice
MAY24 PHONE & INTERNET - LG TOWER
MAY24 PHONE & INTERNET - BOATHOUSE
05/09/2024
MAY24 LISTING DISTRIBUTION SERVICES-GATV
05/09/2024

DEGREASER, AUGER CABLE FOR SHOP
3153.17 103563
443.72 103564
641.53 103565
2391.22 103566
741.53 103567

65.39 103568
5829.76 103569
6868.31 103570
732.84 103571
1715 103572

23.12 103573
779.21 103574
197.78 103575
475 103576
APR24 CLEANING OF TRASH CANS ON CARP & LINDEN AVE
6383.1 103577
316.22 103578

75.65 103579
139.78 103580
Page2
HDL SOFTWARE LLC 05/09/2024 435.65 103581
SIN037732 Invoice MAR24 NEW ACCOUNTS PROCESSED/STR RETURNS IMPULSE ADVANCE CO MMUNICATIONS 05/09/2024 1704.53 103582 118777 Invoice JUN24 PHONE SER VICES
JEFFREY WRIGHT 05/09/2024 2989.12 103583
INV0005698 Invoice PROJECT CLOSEOUT PL-15-1773
JEN WALTZ 05/09/2024 625 103584
INV0005670 Invoice APR24 JUNIOR LIFEGUARD PROGRAM REFUND JIM SWINFORD 05/09/2024 149.43 103585
INV0005700 Invoice PROJECT CLOSEO UT PL-16-1806
JON LEWIS 05/09/2024 510.54 103586
INV0005699 Invoice PROJECT CLOSEOUT PL-19-1993
JULIA STRICKLAND 05/09/2024 2741.14 103587
INV0005707 Invoice PROJECT CLOSEO UT PL-19-2020
INV0005708 Invoice PROJECT CLOSEO UT PL-20-2043
JUSTIN ROWE 05/09/2024 625 103588
INV0005671 Invoice APR24 JUNIOR LIFEGUARD PROGRAM REFUND KANOPY 05/09/2024 91 103589
399800- PPU Invoice APR24 LIBRARY VIDEOS
KARRIE CRANE 05/09/2024 625 103590
INV0005672 Invoice APR24 JUNIOR LIFEGUARDS-B GROUP (AGES 12-13) KELLI FLORES 05/09/2024 200 103591
INV0005673 Invoice APR24 SWIM TEAM REFUND
LAURA SAMPERIO 05/09/2024 14.95 103592
INV0005705 Invoice PROJECT CLOSEOUT PL-21-2104
MAPLE LLC 05/09/2024 2456.36 103593
INV0005703 Invoice PROJECT CLOSEO UT PL-17-1860
MBJ HOMES INC 05/09/2024 398.68 103594
INV0005655 Invoice PROJECT CLOSEOUT PL-14-1731
MELINDA BIE 05/09/2024 300 103595
400 Invoice DTBAB DOWNTOWN T - MERCHANTS MAP FEB24
MISSION UNIFORM SER VICE 05/09/2024 224.92 103596
521448802 Invoice TOWEL & MAT REPLACEMENT AT LIBRARY 4/22/24 521497203 Invoice MAT REPLACEMENT, UNIFORM CLEANING 4/29/24 521497204 Invoice TOWEL & MAT REPLACEMENT FOR CITY HALL 4/29/24 NANCEY CASEY 05/09/2024 4094.32 103597
INV0005701 Invoice PROJECT CLOSEOUT PL-19-1987
NEW BEGINNINGS COUNSELING CENTER 05/09/2024 5830.32 103598 49571 Invoice FEB24 SAFE PARKING PROGRAM
49572 Invoice MAR24 SAFE PARKING PROGRAM
OVERDRIVE INC. 05/09/2024 232.5 103599
01352DA24124090 Invoice APR24 EBOOK/AUDIOBOOKS FOR LIBRARY PACIFIC PLUMBING SPECIALITIES 05/09/2024 188.91 103600
10666-0 Invoice PUSH BUTTON RETROFIT KIT FOR ASH RESTROOMS POLICORE INC. 05/09/2024 805.25 103601
403293 Invoice IT SERVICES-LIBRARY MAR24
PRO WINDOW TINT 05/09/2024 625 103602
3809 Invoice INSTALLATION OF OFFICE WINDOW FROST 5/1/24 PROCO RE 05/09/2024 3437.78 103603
INV0005653 Invoice PROJECT CLOSEO UT PL-21-2082
INV0005658 Invoice PROJECT CLOSEO UT PL-20-2030
PROCO RE 05/09/2024 19.33 103604

Page 3 ends

INV0005621 Invoice PROJECT CLOSEO UT P,L-18-1933
APR24 7900 0440 8110 0954
INV0005654
INV0005704
INV0005625
INV0005624
INV0005660
INV0005662
INV0005659
INV0005652
388335838
APR24 700230547624
APR24 700247140684
APR24 700264659490
APR24 700274833982
APR24 700291369452
APR24 700525378417
APR24 700604790697
APR24 700827356389
APR24 006 514 2700 7
APR24 014 914 3239 7
APR24 016 913 9500 6
APR24 140 914 3084 4
213
6001258906
INV0005710
388335648
388335760

QUADIENT FINANCE USA INC
Invoice POSTAGE FOR Cl1Y HALL 4/26

REESE CORP
Invoice

ROADLINE PRODUCTS INC USA
Invoice STENCIL FOR EV CHARGING ONLY

ROIC CASITAS PLAZA LLC
Invoice

SANTA BARBARA BICYCLE COALITION
Invoice

SARAHDANDONA
Invoice

SATICOY DEVELOPMENT LLC
Invoice PROJECT CLOSEOUT PL-17-1888
Invoice
Invoice

SATICOY DEVELOPMENT LLC
Invoice

SERIGRAPH INDUSTRIES INC
Invoice

SHOWSCAPES
Invoice

SO CA EDISON
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice

SO CAL GAS
Invoice
Invoice
Invoice
Invoice
SOLID WASTE SOLUTIONS INC 05/09/2024
Invoice

STAPLES ADVANTAGE
Invoice

STATE OF CALIFORNIA
Invoice

TAFT ELECTRIC
Invoice
Invoice

TKM ENGINEERING
Invoice
Invoice
Invoice

TREESCAPES
Invoice
Invoice
PROJECT CLOSEOUT PL-19-2028
PROJECT CLOSEOUT PL-18-1930
MAR24 GRANT REIMBURSEMENT
PROJECT CLOSEOUT PL-16-1837
05/09/2024 250 103605
05/09/2024 359.6 103606
05/09/2024 374.75 103607
05/09/2024 1087.84 103608
05/09/2024 1905.5 103609
05/09/2024 864 103610
05/09/2024 2127.54 103611
PROJECT CLOSEOUT PL-19-2010
PROJECT CLOSEOUT PL-21-2103
05/09/2024 2307.63 103612
PROJECT CLOSEOUT PL-21-2131
05/09/2024
PROJECT CLOSEOUT PL-21-2093
05/09/2024
TREE DONATIONS AT BLUFFS 4/24/24
05/09/2024
APR24 ELECTRICl1Y-5103 CARPINTERIA AVE
APR24 ELECTRICl1Y-1 CARPINTERIA TCl
APR24 ELECTRICl1Y-1115 LINDEN AVE B PED
APR24 ELECTRICl1Y-901 CACTUS LN EV EV
APR24 ELECTRICl1Y-MULTIPLE LOCATIONS
APR24 ELECTRICl1Y-WALNUT AVE & 4851 5TH ST
APR24 ELECTRICl1Y-CAPP AV/CSTS PAS 609
APR24 ELECTRICl1Y-CARP & PALM AVE
05/09/2024
NATRUAL GAS 5305 CARPINTERIA AVE (POOL)
NATRUAL GAS 5103 CARPINTERIA AVE (FRIENDS OF THE L
NATRUAL GAS 5775 CARPINTERIA AVE (Cl1Y HALL)
NATRUAL GAS 941 WALNUT AVE (VETS HALL)
APR24 WASTEWATER PROFFESIONAL SERVICES
05/09/2024

COPY PAPER
05/09/2024
PROJECT CLOSEOUT PL-15-1770
05/09/2024
MAR24 CARP & PALM AVE PROJECT
APR24 LINDEN & OGAN RD TRAFFIC SIGNAL REPAIR
05/09/2024
APR24 TRAFFIC SIGNAL TIMING SERVICES
TRAFFIC TECHNOLOGIES LLC 05/09/2024

BLUE DECALS FOR TRUCKS

PARKING LOT CLOSED SIGNS
05/09/2024
TREE MAINTENANCE AT 1443 STERLING AVE 4/4/24
PEST TREATMENT AT VETS HALL 4/9/24
387.64 103613
620 103614
6213.15 103615
4727.28 103616
497.5 103617
112.25 103618

97.5 103619
52108.55 103620
780 103621
272.97 103622
8190 103623
Page4
388335761
388335762
388335763
388335764
388335765
388335766
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
TR EE MAINTENANCE AT 8TH ST 4/9/24
TREE MAINTENANCE AT 8TH ST 4/9/24
TR EE MAINTENANCE AT 897 LINDEN AVE 4/9/24
PEST TREATMENT AT MEMORIAL PARK 4/9/24
TREE MAINTENANCE AT 5290 OGAN RD 4/9/24
PEST TREATMENT AT MEMORIAL PARK 4/9/24
TRI-CO REPROGRAPHICS 05/09/2024 176.58 103624
197870
199191
199296
199580
Invoice
Invoice
Invoice
Invoice
SCANNING SMALL FORMAT,HAND FOLDING 4/3/24
SCANNING SMALL FORMAT,FILE RENAME 4/25/24
SCANNING SMALL FORMAT,FILE RENAME 4/26/24
SCANNING SMALL FORMAT,FILE RENAME 5/1/24
23-2425349
420240157
TRI-CO UNTY OFFICE FURNITURE 05/09/2024
Invoice NEW CHAIRS FOR LIBRARY COMMUNITY ROOM 4/19/24
UNDERGROUND SER VICE ALER T OF SOUTHERN CALIFORNIA 05/09/2024 Invoice MAY24 CA STATE REGULATORY FEE
Invoice
INV0005650
INV0005651

VOGUE SIGN CO MPANY
Invoice
Invoice
WAXIE SANITARY SUPPLY 05/09/2024
82440510
82443541
Invoice
Invoice
96903869
WEX BANK (76)
Invoice
2024-0144

ZWORLD GIS
Invoice

AMAZON CAPITAL SERVICES INC
11H9-NHY9-TRJT
14KT-CT37-7M4J
14LC-3TWV-PHGK
16YN-W4JN-MP9M
17YL-W7DR-1CF6
1C6T-KRV4-YG6L
1CPP-JTWC-T734
1DTD-PW3C-XFFF
1G3H-XKN3-QH4G
1GQM-4J7C-L6WF
1HNH-FMYY-R3WF
1J4G-Y64H-16VK
1JH7-T6LH-QNCP
1KQ7-X611-LFDV
1LNC-1NH9-WFRM
1PP4-4JNL-Q33V
1PQ3-WYP9-36KC
1PR4-QDFV-1KLV
1RJY-QNQW-PK4X
1WWW-4WYK-WXJF
1YP7-9X7Q-TM7M
1500-01063370
287303896883X05102024
Credit Memo
Invoice
Invoice
Invoice
Invoice
Invoice
Credit Memo
Credit Memo
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Credit Memo
Invoice
Invoice
Invoice
Invoice
Credit Memo
Invoice
**Void**
MAY24 NEW TICKET CHARGES & DATABASE MAINTENANCE
05/09/2024
PROJECT CLOSEOUT PL-19-1995
PROJECT CLOSEOUT PL-19-2026

BATH TISSUE FOR ALL PARKS

DOGGIE BAGS,BATH TISSUE,TRASH LINERS FOR PARKS
05/09/2024
APR24 FUEL FOR CITY VEHICLES
05/09/2024
APR24 MAPPING/GIS SERVICES

ANIMAL MEDICAL CLINIC
Invoice JUN23 CONTRACTED VET SERVICES
05/16/2024

AT&T MOBILITY
Invoice

BOOKS FOR LIBRARY

STICKY NOTES,WRITING PAD,ENVELOPES,COPY PAPER
ZIP BOOKS-A. ELIAS
ZIP BOOKS-K. BRYAN
ZIP BOOKS-B. FOX

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY
ZIP BOOKS-T. HILL
ZIP BOOKS-J. YANAGIHARA

OFFICE LAMP
ZIP BOOKS-K. SCHROEDER
ZIP BOOKS-C. COMMUNITY LIBRARY
ZIP BOOKS-L. FRIEDMAN

BOOKS FOR LIBRARY
ZIP BOOKS-M. PATTERSON
ZIP BOOKS-R. MILES
ZIP BOOKS-S. KUTTLER
ZIP BOOKS-S.LARRIOS

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY
05/16/2024
05/16/2024
ASBURY ENVIRONMENTAL SVCS 05/16/2024
Invoice DISPOSAL OF USED OIL/MIXED OILS 4/29/24
26309.73 103625
208.46 103626
663.12 103627
2118.11 103628
380.08 103629
2977 103630
178.06 103631
0 103632
1600 103633
100 103634
05/16/2024 592.18 103635
MAY24 CITY HALL CELL PHONES
2038244656
2038244657
2038244658

BAKER & TAYLOR LLC
Invoice
Invoice
Invoice
05/16/2024 514.65 103636

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

BOOKS FOR LIBRARY

Page 5 ends

BIG GREEN CLEANING COMPANY 05/16/2024 6044 103637
647009
647010
647046
647047
647951
Invoice
Invoice
Invoice
Invoice
Invoice
MAY24 CONTRATCED CLEANING SERVICES AT POOL
MAY24 CONTRATCED CLEANING SER VICES FOR LIBRARY
MAY24 CONTRATCED CLEANING SERVICES AT SEASIDE
MAY24 CONTRATCED CLEANING SERVICES CITY & VETS
APR24 HOMELESS CLEANUP WESTSIDE CARP CREEK 4/11/24
BUREAU VERITAS NORTH AMERICA INC 05/16/2024 10377. 59 103638 Rl24019040 Invoice APR24 PLAN CHECK SERVICES
CAL-COAST MACHINERY INC 05/16/2024 868.63 103639
Invoice
CANNON
Invoice
PARTS FOR UNIT #326
05/16/2024
MAR24 VENOCO PIPELINE ABANDONMENT
CARPINTERIA VALLEY LUMBER CO 05/16/2024
535801
535839
535887
535939
536219
Invoice
Invoice
Invoice
Invoice
Invoice

CIVIC PLUS
Invoice
61144
61148
61152
61154
61169
61173

COASTAL VIEW NEWS
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
COTTON SHIRES AND ASSOCIATES INC 05/16/2024
Invoice PROFESSIONAL ENGINEER ING SVCS THROUGH 2/26/24
MAY24 0013011 028450702
INV0005712

COX BUSINESS
Invoice

EASY LIFT TRANSPORTATION
Invoice

ENCO MPASS CONSULTANT GROUP INC
Invoice

ER IC CASTRO
Invoice

FRONTIER COMMUNICATIONS
MAY24 805-566-1944-032923-5 Invoice
MAY24 805-684-4314-063022-5 Invoice
MAY24 805-684-7613-042205-5 Invoice
MAY24 PREMIUMS
INDl78589
INV0005713

GUARDIAN
Invoice

JACK'S BISTRO
Invoice
INV0005714

LILIA PER EZ
Invoice
LIN CONSULTING INC.

Invoice

MELINDA BIE
Invoice

MICHELLE EDWARDS

PAINT & SUPPLIES FOR SHOP

SUPPLIES FOR WOMENS RESTROOM AT VETS HALL

SUPPLIES FOR WOMENS RESTROOM AT VETS HALL

TARP FOR SALT MARSH WORK

LOCKS FOR LIBRARY, STRAPS & CORDS FOR POOL
05/16/2024
MAY24 MUNICODE PAGES UPDATE
05/16/2024
SANTA MONICA CREEK TRAIL AD 5/2/24
HHW DAY AD 5/2/24
HOST PROGRAM AD 5/2/24
CARPINTERIA BLUFFS RESTORATION AD 5/2/24
HOUSING ELEMENT REPORT AD 5/9/24
HOUSING ELEMENT CERTIFICATION AD 5/9/24
05/16/2024
MAY24 VETS HALL INTERNET-PHONE SERVICE
05/16/2024
MAY24 COMMUNITY TANSPORTATION SERVICES
05/16/2024
APR24 PAVEMENT MAINTENANCE
05/16/2024

TRAVEL REIMBURSEMENT COLUMBUS LIBRARY CONFERENCE
05/16/2024
MAY24 PHONE & INTERNET - BEACH STORE
MAY24 PHONE & INTERNET SERVICES FOR LIBRARY
MAY24 PHONE & INTERNET FOR LG TOWER & BOATHOUSE
05/16/2024
MAY24 PREMIUMS
IIA LIFTING SERVICES INC 05/16/2024
Invoice YEARLY SAFETY INSPECTION UNIT #315 3/19/24
05/16/2024
2024 NATIONAL PUBLIC WORKS WEEK 5/16/24
05/16/2024
REFUND OF PARK DEPOSIT 5/4/24
05/16/2024
APR24 ENGINEERING CARP & PALM AVE INTERSECTION
05/16/2024
DTBAB DOWNTOWN T- MERCHNATS MAP APR24
05/16/2024

Page 6 ends

213 103640
307.13 103641
991.61 103642
1916 103643
670 103644
135.99 103645
1000 103646
3272.5 103647
981.7 103648
396.41 103649
9143.97 103650
414 103651
945.89 103652
100 103653
1167.36 103654
500 103655
390 103656
INV0005733 Invoice SWIM TEAM REFUND 4/29/24
521541464
521541465
521541466
521541467
MISSION UNIFORM SER VICE 05/16/2024
Invoice MAT REPLA CEMENT, UNIFO RM CLEANING 5/6/24
Invoice TOWEL & MAT. REPLACEMENT AT LIBRARY 5/6/24
Invoice TOWEL & MAT REPLACEMENT FOR CITY HALL 5/6/24
Invoice TOWEL & MAT. REPLACEMENT- VETS HALL 5/6/24
PACIFIC PLUMBING SPECIALITIES 05/16/2024
Invoice 2 SINK FAUCET REPAIRS AT VETS HALL
QUADIENT FINANCE USA INC 05/16/2024
MAY24 7900 0440 8110 0954
7423
7968
A81370
388335908
388335909
388335969
388335970
388335973
388335976
388335977
388335981
388335983
APR24 700474689651
MAR24 A 700405192484
6002107270
INV0005715
202400777
INV0005734
INV0005735
INV0005736
INV0005737
INV0005738
100000017517913
100000017517912
Invoice
RISDON'S 76 SERVICE
Invoice
Invoice
Invoice

SHOWSCAPES
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice
Invoice

SO CA EDISON
Invoice
Invoice

STAPLES ADVANTAGE
Invoice
SWRCB
Invoice

THE ATLANTIC
Invoice

TWO TRUMPETS COMMUNICATIONS
Invoice
Invoice

UNITED PET CARE
Invoice
Invoice

MISSIONSQUARE
Invoice
Invoice
Invoice
Invoice
SEIU LOCAL 620
Invoice
CalPERS HEALTH
Invoice
CalPERS HEALTH
Invoice
POSTAGE FOR CITY HALL 5/8/24
05/16/2024
CAR WASH FOR UNIT 250 4/20/24
CAR WASH FOR UNIT 255 4/21/24
NEW TIRES FOR TRUCK 415 4/25/24
05/16/2024
MAY24 SHOW SCAPES MAINTENANCE FY23/24
MAY24 MONTHLY CHEMICAL CHARGE COMPLEX
IRRIGATION REPAIRS AT CARPINTERIA/PALM AVE 4/4/24
IRRIGATION REPAIRS AT 389 LINDEN AVE 4/3/24
IRRIGATION REPAIRS AT TOMO PARK 4/3/24
IRRIGATION REPAIRS AT FIFTH ST/LINDEN AVE 4/3/24
IRRIGATION REPAIRS AT PARKING LOT #3 4/4/24
IRRIGATION REPAIRS AT FIFTH ST/LINDEN AVE 4/4/24
IRRIGATION REPAIRS AT EL CARRO PARK 4/24/24
05/16/2024
APR24 ELECTRICITY-4683 9TH ST
MAR24 ELECTRICITY-MULTIPLE LOCATIONS
05/16/2024

COPY PAPER
05/16/2024

STATE WATER RESOURCES BOARD ANNUAL PERMIT FEE
05/16/2024

ANNUAL MAGAZINE SUBSCRIPTION FOR LIBRARY
APR24 COMMUNICATION SERVICES

UNIQUE MANAGEMENT SERVICES INC
APR24 LOST LIBRARY BOOKS
MAY24 PET INSURANCE PREMIUMS

WESTAIRE HEATING & CONDITIONING INC
05/16/2024
05/16/2024
05/16/2024
05/16/2024
MAR24 MAINTENANCE-CITY HALL
05/16/2024
MISSIONSQUARE Employee Contributions
Deferred Compensation Contribution-Part Time Emp
MissionSquareEmployee Contributions
MISSIONSQUARE Employee Contributions
05/16/2024
Employee Union Dues Contribution
240.73 103657
957.19 103658
500 103659
538.2 103660
24880 103661
9222.4 103662
112.25 103663
1536 103664

44.95 103665
5550 103666
65 103667
35 103668
1250 103669
10053.18 103670
261.12 103671
05/09/2024 7902.99 DFT0003258
MAY24 HEALTH PREMIUMS
05/09/2024 52877.82 DFT0003259
MAY24 HEALTH PREMIUMS
PR10 05/16/24
INTERNAL REVENUE SERVICE 05/16/2024
Invoice PR10 05/16/24 FEDERAL TAX PAYMENT
19748.54 DFT0003269

Page 7 ends

ED D-SIT 05/16/2024 6423.32 DFT0003270
PRl0 05L16L2024 Invoice PRl0 05/16/24 SIT TAX PAYMENT
ED D-SDI 05/16/2024 1902.52 DFT0 003271
PRlO 05Ll6L2024 Invoice PRlO 05/16/24 SDI TAX PAYMENT
CalPER S 05/16/2024 13 579.32 DFT 0003272
4L24L24-5L10L24 CLASSIC Invoice CLASSIC RETIREMENT CONTR IBUTION 4/24/24-5/10/24 CalPERS 05/16/2024 12705.09 DFT0 003273
4L27 L24-5L10L24 PEP RA Invoice PEPRA RETIREMENT CO NTRIBUTION 4/24/24-5/10/24

Page 8 ends

City of Carpinteria

COUNCIL AGENDA STAFF REPORT
May 28, 2024

ITEM FOR COUNCIL CONSIDERATION
Contracts Executed by the City Manager on behalf of the City for the Period of April 16, 2024 through May 20, 2024.

STAFF RECOMMENDATION
Receive and file Report of Contracts Executed by the City Manager for the Period of April 16, 2024 through May 20, 2024.

DISCUSSION
The City Manager is delegated authority by the Carpinteria Municipal Code (CMG), §2.08.1508, to execute contracts on behalf of the City in the amount of $30,000 or less. Pursuant to CMG §2.08.150C, a list of all contracts executed by the City Manager is provided for City Council information and appended to this Staff Report as Attachment A. Attachment A lists all contracts entered into on behalf of the City for goods, construction and services for the Period of April 16, 2024 through May 20, 2024.

FINANCIAL CONSIDERATIONS
All contracts entered into are within the appropriated budgeted amounts.

ATTACHMENTS
A. Report of Contracts Executed by the City Manager
Agenda Item No. 6
Report of Contracts Executed by City Manager
May 28, 2024

Page 2 ends

Staff contact:

Brian C. Barrett, City Clerk
(805) 755-4403, [email protected]
Reviewed by: Ryan Kintz, Assistant City Manager
(805) 755-4400; [email protected]
G:\CC Staff Reports\2024 0528\FINAL\Report of Contracts Executed by CM\Report of Contracts Awarded by City Manager.docx

ATTACHMENT A
Report of Contracts Executed by the City Manager
P en. o d 0 f A .pn ·1 16 . I 2024 th rouq h M av 20 I 2024

VENDOR PURPOSE AMOUNT
Cannon Corporation Engineering Plan Check & Inspection $30,000 Staff Augmentation
Geosyntec Consultants Extension of Term to June 30, 2024 for $0.00 Project Management Assistance for
the Via Real Stormwater Project
Bie & Bie Productions Increase the Budget for the Creation of $1,500 a Merchant Map for the Downtown "T"
Business Advisory Board
Esau's Coffee Shop, Inc. Parklet Lease Agreement for Lessee pays City $1,492.80 Downtown "T" Encroachment Permit per year for term of lease No. 7391 at 507 Linden Avenue agreement
City of Carpinteria

COUNCIL AGENDA STAFF REPORT
May 28, 2024

ITEM FOR COUNCIL CONSIDERATION
Monthly City Treasurer's Report on Compliance with Statement of Safekeeping and Investment of Public Funds.

STAFF RECOMMENDATION
Receive and file the report.

Sample Motion: I move to receive and file the report.

BACKGROUND / DISCUSSION
The City Council is the City of Carpinteria trustees and is authorized to make investment decisions concerning public funds that are subject to the Prudent Investment Standard.

The Prudent Investor Standard of the California Government Code Section 53600.3 states, "when investing, reinvesting, purchasing, acquiring, exchanging, selling or managing public funds, a trustee shall act with care, skill, prudence and diligence under circumstances then prevailing, including, but not limited to, the general economic conditions and the anticipated need of the City, that a prudent person in a like capacity and familiarity with those matters would use in the conduct of funds of a like character and with like aims, to safeguard the principal and maintain the liquidity needs of the City." The standard or prudence to be used by investment officials shall be applied in the context of managing the overall portfolio.

Trustees are those persons authorized to make investment decisions on behalf of a local agency. Trustees or City Investment Officials, acting in accordance with investment policy and exercising due diligence, shall be relieved of personal responsibility for an individual security's credit risk changes or market price changes, provided deviations from expectations are reported in a timely manner and appropriate action is taken to control adverse developments.

The purpose of this agenda matter is to provide the City Council with the required monthly Treasurer's Report (Attachment A.)
Agenda Item No. 7
Monthly City Treasurer's Report
May 28, 2024

Page 2 ends

POLICY CONSISTENCY
The City is in compliance with the adopted Statement of Safekeeping and Investment of Public Funds.

FINANCIAL CONSIDERATIONS
Cash Statement: On April 30, 2024, the City held cash and cash investments as shown in the table below.

Table I
CASH ACTIVITY FOR THE MONTH:

Cash and Investment Beginning of the Month
Cash Receipts
Cash Disbursements
Cash and Investment End of the Month
$ 19,525,009.20
5,782,196.44
(4,484,619.58)
$ 20,822,586.06
Investments:

Changes in the market value of treasury securities are inversely proportional to changes in interest rates demanded in the open market (i.e., when rates rise market values fall, when rates fall market values rise.) The sensitivity of a portfolio's market value to these changes in market rates is a function of its days to maturity and its coupon rate.

Securities with longer maturities and/or lower coupon rates are more sensitive to changes in market interest rates. As security matures, changes in its value become less sensitive to market rate changes.

As of April 30, 2024, the portfolio's average days to maturity was 2.07 years, the average coupon rate was 2.09%, the average yield to maturity was 5.08%, the par value was $10,500,000 and the Market Value was $10,033,085.86.

The City does not intend to sell nor does it have any foreseeable need to sell any securities. The City's investment policy intends to hold all securities to maturity, and securities so held are redeemed at par value resulting in no net market gain or loss.

Attached for City Council review is the Treasurer's Report listing all the investments and cash activity during the month.

The City of Carpinteria will be able to meet all expenditure obligations that might reasonably be anticipated for the next six-month period November 1, 2024. \\COCSH\GDrive\Admin Services\Bank Reconciliations\Treasury\City Treasurer's report.docx Monthly City Treasurer's Report
May 28, 2024

Page 3 ends

LEGAL
This report has been prepared in compliance with California Government Code Sections 53600 and 53646.

PRINCIPAL PARTIES EXPECTED AT MEETING
None.

ATTACHMENTS
Attachment A: City of Carpinteria Monthly Treasurer's Report S
Li
t
c
a
e
ff
tt
c
e
o
M
nt
a
a
l
ct
do
:
nado, Administrative Services Director
~
------~-~~-~-
[email protected]; (805) 755-4448 Signature
Reviewed by: Michael Ramirez, City Manager
[email protected]; (805) 755-4450
\\COC5H\GDrive\Admin Services\Bank Reconciliations\Treasury\City Treasurer's report.docx Attachment A
City Treasurer's Monthly Report

CITY OF CARP INTERIA TREAS URER'S REPORT
For the Month Ended April 2024
CASH ACTIVITY FOR THE MONTH:

Cash and Investment Beginning of the Month $ 19,525,009.20 Cash Receipts 5,782,196.44
Cash Disbursements (4,484,619.58}
Cash and Investment End of the Month $ 2Q 822 ~8(:i Q(:i CASH AND INVESTMENT PORTFOLIO:

Type of lnvestment/CouponlCUSIP #
Yield to Maturity # Days to
Institution/Issuer Maturity Date Maturity Par Value Market Value (1) Book Value (2) Demand Deposit - General Checking Montecito Bank NIA NIA NIA 363,056.05 363,056.05 363,056.05 Demand Deposit - Premier Public Money Market Montecito Bank NIA 511/2024 1 1,756,707.86 1,756,707.86 1,756,707.86 Demand Deposit - Section 125 Checking Montecito Bank NIA NIA NIA 4,874.10 4,874.10 4,874.10 Demand Deposit - Payroll Checking Montecito Bank NIA NIA NIA 154,861.00 154,861.00 154,861.00 Local Agency Investment Fund State of California 0.22% 511/2024 I 3,608,953.26 3,608,953.26 3,608,953.26 Demand Deposit - Money Market Charles Schwab NIA 511/2024 I 4,720,562.20 4,720,562.20 4,720,562.20 Treasury Note, 2.0%, (912828XT2) U.S. Government 1.11% 513112024 31 250,000.00 249,296 88 255,107.50 Treasury Note, 0.25%, (91282CCG4) U.S. Government 4.61% 6/1512024 46 250,000.00 248,398.43 235,669.96 Treasury Note, 3.0%, (91282CFA4) U.S. Government 4.53% 7131/2024 92 250,000.00 248,515.63 244,503.55 Treasury Note, 3.25%, (91282CFG I) U.S. Government 4.30% 8131/2024 123 250,000.00 248,281.25 245,158.84 Treasury Note, 0.375%, (91282CCX7) U.S. Government 1.08% 9/1512024 138 250,000.00 245,429.68 245,359.46 Treasury Note, 2.125%, (9128282Y5) U.S. Government 4.31% 913012024 153 250,000.00 246,679.68 239,586.84 Treasury Note, 0.625%, (91282CDB4) U.S. Government 4.14% 10/1512024 168 250,000.00 244,687.50 233,056.64 Treasury Note, 2.25%, (912828G38) U.S. Government 4.35% I 111512024 199 250,000.00 245,859.38 241,052.35 Treasury Note, 1.00%, (91282CDN8) U.S. Government 0.98% 12/1512024 229 250,000.00 243,398.43 250,079.39 Treasury Note, 1.125%, (91282CDS7) U.S. Government 4.09% I/1512025 260 250,000.00 242,773.43 237,350.47 Treasury Note, I. 125%, (912828ZC7) U.S. Government 1.29% 2128/2025 304 250,000.00 241,562.50 248,74000 Treasury Note, 2.625%, (9128284F4) U.S. Government 1.30% 3131/2025 335 250,000.00 244,179.68 260,224.61 Treasury Note, 0.25%, (912828ZT0) U.S. Government 1.25% 5131/2025 396 250,000.00 236,953.13 241,660.01 Treasury Note, 0.25%, (912828ZW3) U.S. Government 1.53% 613012025 426 250,000.00 236,054.68 239,598.86 Treasury Note, 0.25%, (91282CAM3) U.S. Government 1.32% 913012025 518 250,000.00 233,320.30 240,265.00 Treasury Note, 3.0%, (912828515) U.S. Government 409% 10131/2025 549 250,000.00 242,265.63 242,136.63 Treasury Note, 0.375%, (91282CBC4) U.S. Government 1.20% 1213112025 610 250,000.00 231,210.92 241,955.00 Treasury Note, 0.375%, (91282CBC4) U.S. Government 1.37% 1213112025 610 250,000.00 231,210.93 240,365.00 Treasury Note, 3.875%, (91282CGE5) U.S. Government 3.77% 11112026 61 I 250,000.00 244,960.93 250,641.19 Treasury Note, 1.625%, (912828P46) U.S. Government 1.56% 2/1512026 656 250,000.00 235,234.38 250,595.69 Treasury Note, 0.5%, (91282CBQ3) U.S. Government 1.28% 212512026 666 250,000.00 230,117.18 242,113.19 Treasury Note, 0.75%, (91282CBT7) U.S. Government 1.28% 3131/2026 700 250,000.00 230,585.93 244,459.30 Treasury Note, 0.75%, (91282CCF6) U.S. Government 1.34% 5131/2026 761 250,000.00 229,023.43 243,702.50 Treasury Note, 0.875%, (91282CCJ8) U.S. Government 1.35% 613012026 791 250,000.00 229,023.43 244,821.96 Treasury Note, 1.625%, (91282YQ7) U.S. Government 400% 1013112026 914 250,000.00 230,664.05 227,869.30 Treasury Note, 2%, (91282024) U.S. Government 4.31% 1111512026 929 250,000.00 232,57813 228,317.27 Treasury Note, 1.25%, (91282CDK4) U.S. Government 1.28% I 1/3012026 944 250,000.00 227,890.63 249,602.02 Treasury Note, 1.5%, (912828278) U.S. Government 3.64% 1/31/2027 1006 250,000.00 228,281.25 231,040.31

CITY OF CARP INTERIA TREAS URE R'S REPORT
For the Month Ended April 2024
Treasury Note, 2.25%, (912828V98) U.S. Government 4.29% 2/15/2027 !021 250,000.00 232,890.63 229,819.14 Treasury Note, 2.5%, (91282CEF4) U.S. Government 3.96% 2/16/2027 1022 250,000.00 234,062.50 235,031.06 Treasury Note, 2.75%, (91282CEN7) U.S. Government 3.71% 4/30/2027 1095 250,000.00 235,312.50 241,094.62 Treasury Note, 3.25%, (91282CEW7) U.S. Government 3.70% 6/30/2027 1156 250,000.00 238,359.38 245,668.13 Treasury Note, 3.125%, (91282CFH9) U.S. Government 4.19% 8/31/2027 1218 250,000.00 236,875.00 238,232.21 Treasury Note, 4.125%, (91282CFU0) U.S. Government 4.02% 10/31/2027 1279 250,000.00 244,296.88 250,962.10 Treasury Note, 2.25%, (9128283F5) U.S. Government 4.01% 11/15/2027 1294 250,000.00 229,218.75 232,267.50 Treasury Note, 3.875%, (91282CGC9) U.S. Government 4.01% 12/31/2027 1340 250,000.00 242,109.38 248,750.00 Treasury Note, 4%, (91282CGPO) U.S. Government 3.99% 2/29/2028 1400 250,000.00 242,968.75 249,990.24 Treasury Note, 3.625%, (91282CGT2) U.S. Government 4.15% 2/29/2028 1400 250,000.00 239,570.30 244,990.00 Treasury Note, 4%, (91282CHK0) U.S. Government 4.14% 3/31/2028 1431 250,000.00 242,734.38 248,593.75 Treasury Note, 4.125%, (91282CHQ7) U.S. Government 4.13% 7/31/2028 1553 250,000.00 243,828.13 249,920.00 Treasury Note, 4.375%, (91282CHX2) U.S. Government 4.23% 8/31/2028 1584 250,000.00 246,171.88 251,445.00 Treasury Note, 4.375%, (91282CJN2) U.S. Government 4.20% 11/30/2028 1675 250,000.00 246,250.00 251,775.00 21,109,014.47 20,642,100.33 20,822,586.06

REPORT ON COMPLIANCE WITH STATEMENT OF SAFEKEEPING AND INVESTMENT OF PUBLIC FUNDS The City is in compliance with the adopted Statement of Safekeeping and Investment of Public Funds.

REPORT OF ABILITY TO MEET REQUIRED EXPENDITURES FOR THE NEXT SIX MONTHS Based upon currently budgeted revenues and expenditures, the City currently has sufficient liquid financial resources to meet anticipated expenditures during the period 5/01/24 through 11/01/24.

WEIGHTED AVERAGE MATURITY OF PORTFOLIO
As of April 30, 2024 the weighted average days to maturity of the City's investment portfolio is 2.07 years.

FOOTNOTES TO REPORT/DEFINITION OF TERMS:
(I) The market value of U.S. Goverment Securities was provided by the custodial agent, Charles Schwab.

For the Local Agency Investment Fund the market value represents the contract value.

For all other investments, the market value is equal to book value. (2) Book value of demand deposits equals the bank balance minus outstanding checks plus deposits-in-transit.

Yield to Maturity (YTM): The percentage rate of return for the note assuming that the City holds the asset until its maturity date. It is the sum of all its remaining coupon payments.

Par Value: Equals face value of security (value of the security when it reaches maturity).

Market Value: The last price for which a security was bought or sold. In this case, the value as of the last day of the month of this report.

Book Value: The amount at which the security is carried in the City's accounting records (adjusted at year-end for GASB 40 reporting purposes).

City of Carpinteria

COUNCIL AGENDA STAFF REPORT
May 28, 2024

ITEM FOR COUNCIL CONSIDERATION
Ordinance No. 782, an Ordinance of the City Council, of the City of Carpinteria, California, amending Chapter 2.37 of the Carpinteria Municipal Code to modify the composition of the Carpinteria Community Library Advisory Commission and align reporting requirements with State law.

STAFF RECOMMENDATION
Adopt Ordinance No. 782 (second reading).

Sample Motion: I move to adopt Ordinance No. 782. (Requires a roll call vote.)

BACKGROUND
At the February 2024 Library Board of Trustees (LBOT) meeting, staff was directed to return to the City Council with modifications to Ordinance No. 782 reflecting the option to include a youth position on the Library Advisory Commission (LAC) and an update regarding the timing of the LAC annual reporting to the LBOT.

A public library operating in California and receiving resources and support from the California State Library is required to report statistics to the State Library. Each year the State provides a template for public libraries to populate the data the State Library needs to document their work.

In 2023, the Public Library Survey (PLS) was due to the State Library on November 7. This is a key document used to provide LBOT an annual report as it contains all the data accrued in the previous fiscal year.

The City Council approved Ordinance No. 782 on May 13, 2024. The purpose of this agenda item is for the Council to consider adopting Ordinance No. 782.

DISCUSSION
As per the LBOT discussion and direction provided at the February 2024 meeting, adding the option to include a youth position on the Library Advisory Commission serves two purposes:
introducing city government and processes to young people by providing hands on experience in an advisory position as well as providing the LAC members with additional input from youth stakeholders. Staff has prepared a redlined Ordinance No. 782, provided in Attachment A, Agenda Item No. 8
Ordinance 782 - LAC Revised
May 28, 2024

Page 2 ends

showing the proposed language that would codify the option for the LAC to include a Youth Representative from the Library service area.

In addition, in order to provide the LAC time to prepare a thorough annual report to the LBOT, using data collected for the California State Library, staff is recommending a modification to the date the annual report is due as written in Ordinance No. 782. This recommended change allows for the date when the Annual Report is submitted to the LBOT to be amended as needed and is reflected in the redlined version of the Ordinance No. 782 provided in Attachment A. Attachment B shows a clean version of the updated Ordinance.

POLICY CONSISTENCY
This agenda item is consistent with the City's 2024 Strategic Plan Primary Goal #4: "Strengthen Community Institution Collaboration" by identifying and implementing opportunities for youth engagement in City government activities.

FINANCIAL CONSIDERATIONS
Staff time to prepare the report is included in the Adopted FY 2023-24 Budget.

LEGAL AND RISK MANAGEMENT CONSIDERATIONS
The City Attorney's Office has provided the edits to the proposed changes to Ordinance No. 782 and is available to answer any questions.

OPTIONS

1. Adopt Ordinance No. 782 (second reading).

2. The City Council may choose not to adopt Ordinance No. 782 and instead provide alternative direction to staff.

PRINCIPAL PARTIES EXPECTED AT MEETING
No principal parties expected to attend.

ATTACHMENTS
Attachment A -Ordinance No. 782
Staff contact: Jody Thomas
(805) 684-4314, [email protected]
Reviewed by: Ryan Kintz, Assistant City Manager
(805) 755-4400, [email protected]
G:\CC Staff Reports\2024 0528\FINAL\Revision of the LAC Ordinance\Staff Report - New Ordinance 782 - Revision of LAC Ordinance.docx
ORDINANCE NO. 782

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
CARPINTERIA, CALIFORNIA, AMENDING CHAPTER 2.37 OF THE

CARPINTERIA MUNICIPAL CODE TO MODIFY THE COMPOSITION

OF THE CARPINTERIA COMMUNITY LIBRARY ADVISORY

COMMISSION AND ALIGN REPORTING REQUIREMENTS WITH

STATE LAW
WHEREAS, on June 14, 2021, the City Council adopted Ordinance No. 747, establishing a Municipal Library, Library Board of Trustees, and the Library Division of the Parks, Recreation and Public Facilities Department; WHEREAS, on October 11, 2021, the Library Board of Trustees approved Resolution No. 6074 establishing a Library Advisory Commission and adopting bylaws for its operation;
WHEREAS, on June 13, 2022, the City Council adopted Ordinance 756, which superseded Resolution No. 6074 by incorporating the resolution's contents into Chapter 2.37 of the Carpinteria Municipal Code ("CMC"), thereby establishing the Library Advisory Commission by ordinance;
WHEREAS, the City Council now desires to add a non-voting youth position to the Library Advisory Commission and ensure alignment of the annual Librarian reporting requirement with anticipated future changes to State law.

NOW THEREFORE, the City Council of the City of Carpinteria does ordain as follows:

SECTION 1. Incorporation of Recitals
The above recitals are true and correct and are incorporated herein, and are each relied upon independently by the City Council for its adoption of this Ordinance.

SECTION 2. Amendment to Sections 2.37.010 and 2.37.050 in CMC Chapter 2.37 ("Library Advisory Commission")
A. Section 2.37.010 is modified to read as follows (strikeout indicates deletion, underlining indicates addition):

2.37.010 - Established-Membership.

The Carpinteria Community Library Advisory Commission ("commission") shall be composed of five members representative of the library service area with an option to expand as needed. Members will be appointed to two-year terms. All members of the commission shall be appointed through 28372811.3
Ordinance No. 782

Page 2 ends

nomination by the president of the library board of trustees ("board") and consent of the board, and shall serve at the pleasure of the board. The Commission may also include a Youth Representative from the Library service area. The commission shall invite a liaison representative from the Friends of the Carpinteria Library, Friends of the Montecito Library, the City Representative to the Santa Barbara County Library Advisory Committee, and a representative from the office of the County Board of Supervisors First District to attend regular meetings.

Should additional libraries be added to the Carpinteria Library System in the future, additional voting members may be added to the commission.

The board president and board shall also, through its nomination and appointment process, seek to ensure a commission that is representative of the library service area population demographic; library user groups, including underrepresented user groups; and person(s) knowledgeable in library management and operations.

2.37.050 - Duties and Responsibilities.

The commission shall have the duties and responsibilities specified below, acting in an advisory capacity to the board and city librarian in matters pertaining to the management, administration, operation, development, improvement and maintenance of the library, including but not limited to:

E. Submitting an annual report on the condition of the library for consideration by the board each year, pursuant to Education Code 18927, as it may be amended from time to time;
SECTION 3. Effective Date
This Ordinance shall take effect and be in force and effect thirty days from and after its passage; and before the expiration of fifteen days of its passage shall be published once with the names of the members of the City Council voting for and against the same in the Coastal View, a newspaper of general circulation, published in the City of Carpinteria, County of Santa Barbara adoption pursuant to California Government Code section 36937.

SECTION 4. Severability
If any section, subsection, sentence, clause, phrase or word of this Ordinance is for any reason held to be invalid by a court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance.

The City Council hereby declares that it would have passed and adopted this Ordinance, and each and all provisions hereof, irrespective of the fact that one or more provisions may be declared invalid.
28372811.3
Ordinance No. 782

Page 3 ends

SECTION 5. CEQA Exemption
The City Council finds that this Ordinance is not subject to the California Environmental Quality Act ("CEQA") pursuant to State CEQA Guidelines §15060(c)(3) (this activity is not a "project" as defined in $15378).

SECTION 6. Certification
The City Clerk shall certify to the passage and adoption of this Ordinance.

PASSED, APPROVED AND ADOPTED on May 28, 2024, by the following vote:

AYES: COUNCILMEMBER(S):

NOES: COUNCILMEMBER(S):

ABSENT: COUNCILMEMBER(S):

ABSTAIN: COUNCILMEMBER(S):

Al Clark, Mayor of Carpinteria
ATTEST
Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
I hereby certify that the foregoing ordinance was adopted after second reading at a regular meeting of the City Council of the City of Carpinteria held on May 28, 2024.

Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
28372811.3
Ordinance No. 782
Page4

APPROVED AS TO FORM
Jena S. Acos, on behalf of Brownstein
Hyatt Farber Schreck, LLP acting as
City Attorney for the City of Carpinteria
28372811.3
City of Carpinteria

COUNCIL AGENDA STAFF REPORT
May 28, 2024

ITEM FOR COUNCIL CONSIDERATION
Resolutions calling the November 5, 2024 General Municipal Election and requesting the Santa Barbara County Board of Supervisors to consolidate said election with the Presidential General Election to be held the same day, and adopting regulations for Candidate Statements.

STAFF RECOMMENDATION
Adopt the attached two resolutions relating to the November 5, 2024 election:

1. Resolution No. 6317, calling for the holding of a General Municipal Election to be held on Tuesday, November 5, 2024 and requesting the Board of Supervisors of the County of Santa Barbara to consolidate said election with the Presidential General Election; and

2. Resolution No. 6318, adopting regulations for Candidates' Statements.

Sample Motion: I move to adopt Resolution Nos. 6317 and 6318, as read by title only.

BACKGROUND
The City's General Municipal Election is held on the day of the Statewide General Election in November of each even-numbered year. The November 5, 2024 election will be the City's second district-based election, completing its transition to the district election system with the election of a representative for City Council District Nos. 2 and 4 (which are currently atlarge) for four-year terms.

In March 2024, City Council District No. 3 Councilmember Roy Lee ("Lee") was elected to the Santa Barbara County Board of Supervisors ("Board") and will take office on the Board in January 2025. On May 7, 2024, Councilmember Lee submitted his resignation to the City Clerk, requesting to serve in the position until the swearing-in of his replacement on December 9, 2024. On May 13, 2024, the City Council directed staff to fill Councilmember Lee's District No. 3 seat by special election which will be consolidated with the General Municipal and Presidential Elections that will occur on November 5, 2024.

Agenda Item No. 9
November 5, 2024 General Municipal Election of City Council Candidates May 28, 2024

Page 2 ends

In addition, the ballot submitted to voters may include a measure proposing an amendment to the City's Transient Occupancy Tax per Resolution No. 6320, depending on Council action. This measure will be heard as a subsequent item on the May 28, 2024 City Council agenda.

The purpose of this agenda item is for the Council to consider adoption of Resolution Nos. 6317 and 6318, calling the November 5, 2024 General Municipal Election, requesting the Board consolidate it with any and all elections occurring on the same date, and adopting regulations for Candidate Statements, respectively. The City's General Municipal Election will be for the purpose of electing two members of the City Council representing District Nos. 2 and 4 for the full term of four years, electing one member of the City Council representing District No. 3 for a half term of two years (the balance of Councilmember Lee's term), and placing a transient occupancy tax measure on the ballot.

DISCUSSION
Sections 10400 through 10418 of the California Elections Code provide the procedures on consolidating elections. The procedure requires the City Council to request consolidation at the same time the resolution calling the election is adopted. These resolutions authorize the agency conducting the election (County of Santa Barbara) to conduct the election on behalf of the City and to canvass the results. The City will be responsible for reimbursing the County for the actual election cost upon presentation of a bill. The Elections Code also requires the Council to adopt regulations for candidates pursuing elective office to draft legally sound candidate statements.

Elections Code Section 10403 provides that whenever an election called by a city for the submission of a question, proposition, or office to be filled is to be consolidated with a Statewide Election, and the question, proposition or office to be filled is to appear on the same ballot as that provided for in the Statewide Election, the city shall file with the Board of Supervisors a resolution of its governing board requesting consolidation. Per the Elections Code, the resolution requesting consolidation must be filed at least 88 days prior (August 9, 2024) to the date of the election. However, the County of Santa Barbara Board of Supervisors will be in summer recess from July 23, 2024 to August 13, 2024, and their last meeting before this deadline is July 16, 2024. Hence, the deadline to submit a consolidation request to the Clerk of the Board is July 3, 2024.

POLICY CONSISTENCY
The proposed actions related to setting the City's municipal election are consistent with County policies and procedures and State law. Also, the proposed consolidated election is consistent with the City's interest in efficient use of public resources.

FINANCIAL CONSIDERATIONS
As shown in Table 1 below, the City's election costs significantly decrease when the City consolidates with the County, compared to holding a "stand-alone" election without G:\CC Staff Reports\2024 0528\FINAL\Election - Candidates\Staff Report Election - Candidates.docx November 5, 2024 General Municipal Election of City Council Candidates May 28, 2024

Page 3 ends

assistance from the Santa Barbara County Elections Office. In contrast, a stand-alone special election could incur expenses of up to $100,000.

Table 1: Santa Barbara County Elections Office Candidate Election Cost Estimat e Contest Reqistered Voters Estimate
One Seat, District No. 2 1,664 $2,500
One Seat, District No. 3 1,856 $2,600
One Seat, District No. 4 1,676 $2,500
TOTAL $7,600
The estimated cost to consolidate the 2024 General Municipal Election with the Statewide Election conducted by the County of Santa Barbara will be included in the Proposed 2024- 25 Fiscal Year Budget that staff will present to the Council in June.

No Additional Funding Requested. There is sufficient budget in 101-132-5201 - Professional Services.

LEGAL AND RISK MANAGEMENT CONSIDERATIONS
The City Attorney has reviewed the requisite election resolutions and will be available to answer questions at the meeting.

OPTIONS

1. Adopt the Resolutions as submitted. (Staff Recommendation)

2. Amend the Resolutions, provided all requirements of the Elections Code are met, and adopt the Resolutions as amended.

3. Do not adopt the Resolutions and provide direction to staff as appropriate.

PRINCIPAL PARTIES EXPECTED AT MEETING
There are no principal parties expected at the meeting.

ATTACHMENTS
A. Resolution No. 6317, calling for the holding of a General Municipal Election to be held on Tuesday, November 5, 2024 and requesting the Board of Supervisors of the County of Santa Barbara to consolidate said election with the Presidential General Election
B. Resolution No. 6318, adopting regulations for candidates for elective office pertaining to candidates' statements submitted to the voters G:\CC Staff Reports\2024 0528\FINAL\Election - Candidates\Staff Report Election - Candidates.docx November 5, 2024 General Municipal Election of City Council Candidates May 28, 2024

Page 4 ends

Staff contact:

Brian C. Barrett, City Clerk
(805) 755-4403; [email protected]
Reviewed by: Ryan Kintz, Assistant City Manager
(805) 755-4400, [email protected]
G:\CC Staff Reports\2024 0528\FINAL\Election - Candidates\Staff Report Election - Candidates.docx November 5, 2024 General Municipal Election of City Council Candidates May 28, 2024

Page 5 ends

ATTACHMENT A
Resolution No. 6317
G:\CC Staff Reports\2024 0528\FINAL\Election - Candidates\Staff Report Election - Candidates.docx November 5, 2024 General Municipal Election of City Council Candidates May 28, 2024

Page 6 ends

THIS PAGE INTENTIONALLY LEFT BLANK
G:\CC Staff Reports\2024 0528\FINAL\Election - Candidates\Staff Report Election - Candidates.docx RESOLUTION NO. 6317

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

CARPINTERIA, CALIFORNIA, CALLING FOR THE HOLDING

OF A GENERAL MUNICIPAL ELECTION TO BE HELD ON
TUESDAY, NOVEMBER 5, 2024 AND REQUESTING THE

BOARD OF SUPERVISORS OF THE COUNTY OF SANTA

BARBARA TO CONSOLIDATE SAID ELECTION WITH THE

PRESIDENTIAL GENERAL ELECTION TO BE HELD ON THE

SAME DATE
WHEREAS, under the provisions of the laws relating to general law cities in the State of California, a General Municipal Election shall be held on November 5, 2024 in. the City of Carpinteria ("City"), for the election of Municipal Officers representing City Council District Nos. 2 and 4; and
WHEREAS, a vacancy in the office of City Council District No. 3 was created by the resignation of Councilmember Roy Lee on May 7, 2024. This office will commence upon the swearing-in scheduled for December 9, 2024 and this term will end in December 2026 (half term of two years); and
WHEREAS, on May 13, 2024, the City Council chose to fill the vacant City Council District No. 3 seat by election; and
WHEREAS, it is desirable that the General Municipal Election be consolidated with any and all elections to be administered by Santa Barbara County ("County") on the same date and conducted in all respects as if there were only one election; and WHEREAS, the City seeks the provision of election services from the County related to the conduct of the City's General Municipal Election.

NOW, THEREFORE, BE IT RESOLVED as follows:

SECTION 1. The above recitals are true and correct, and incorporated herein by reference.

SECTION 2. Pursuant to the requirements of the laws of the State of California relating to General Law Cities, there is called and ordered to be held in the City of Carpinteria, California, on Tuesday, November 5, 2024, a General Municipal Election for the purpose of electing two Members of the City Council representing City Council District Nos. 2 and 4 for the full term of four years (terms ending in November 2028) and also electing one Member of the Resolution No. 6317

Page 2 ends

City Council representing District No. 3 for the half term of two years due to Councilmember Lee's resignation (term ending in November 2026).

SECTION 3. Pursuant to Resolution No. 6320, a general tax measure relating to the City's transient occupancy tax is to also be submitted to the voters on the ballot for the General Municipal Election.

SECTION 4. Pursuant to the requirements of§ 10403 of the Elections Code, the County Board of Supervisors is hereby requested to consent and agree to the consolidation of the City's General Municipal Election with the County-administered election occurring on the same date and to permit the County Elections Official to render specified services to the City. That the Board of Supervisors is requested to issue instructions to the County Elections Department to take any and all steps necessary for the holding of the consolidated election.

SECTION 5. That the ballots to be used at the election shall be in form and content as required by law. The election shall be held in all respects as if there were only one election, and only one form of ballot shall be used.

SECTION 6. That the City Clerk is authorized, instructed and directed to coordinate with the County of Santa Barbara Registrar-Recorder/County Clerk to procure and furnish any and all official ballots, notices, printed matter and all supplies, equipment and paraphernalia that may be necessary in order to properly and lawfully conduct the election.

SECTION 7. That the polls (vote centers) for the election shall be open at seven o'clock a.m. of the day of the election and shall remain open continuously from that time until eight o'clock p.m. of the same day when the polls (vote centers) shall be closed, pursuant to Election Code§ 10242, except as provided in §§ 14212, 14401 of the Elections Code of the State of California.

SECTION 8. That in all particulars not recited in this resolution, the election shall be held and conducted as provided by law for holding municipal elections.

SECTION 9. That notice of the time and place of holding the election is given and the City Clerk is authorized, instructed and directed to give further or additional notice of the election, in time, form and manner as required by law.

SECTION 10. The County Elections Department is authorized to canvass the returns of the General Municipal Election. That in the event of a tie vote (if any two or more persons receive an equal and the highest number of votes for an office) as certified by the County of Santa Barbara Registrar-Recorder/County Clerk, the City Council, in accordance with Election Code § 15651 (a), shall set a date, time, and place and summon the candidates who have received the tie votes to appear and will determine the tie by lot.

SECTION 11. That the City Clerk is hereby directed to file a certified copy of this resolution, along with Resolution No. 6320, with the Board of Supervisors and the County Elections Department.

Resolution No. 6317

Page 3 ends

SECTION 12. The City Council authorizes the City Clerk and Santa Barbara County Elections Office to administer said election, and agrees to reimburse the County in full for all reasonable and actual election expenses upon presentation of a properly submitted bill.

SECTION 13. That the City Clerk shall certify to the passage and adoption of this Resolution and enter it into the book of original Resolutions.

PASSED, APPROVED AND ADOPTED on this 28th day of May, 2024, by the following vote:

AYES: COUNCILMEMBER(S):

NOES: COUNCILMEMBER(S):

ABSENT: COUNCILMEMBER(S):

ABSTAIN: COUNCILMEMBER(S):

Mayor, City of Carpinteria
ATTEST:

Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
I hereby certify that the foregoing resolution was adopted at a regular meeting of the City Council of the City of Carpinteria held on May 28, 2024.

Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
APPROVED AS TO FORM:

Jena Shoaf Acos, on behalf of Brownstein
Hyatt Farber Schreck, LLP acting as
City Attorney of the City of Carpinteria
November 5, 2024 General Municipal Election of City Council Candidates May 28, 2024

Page 7 ends

ATTACHMENT B
Resolution No. 6318
G:\CC Staff Reports\2024 0528\FINAL\Election - Candidates\Staff Report Election - Candidates.docx November 5, 2024 General Municipal Election of City Council Candidates May 28, 2024

Page 8 ends

THIS PAGE INTENTIONALLY LEFT BLANK
G:\CC Staff Reports\2024 0528\FINAL\Election - Candidates\Staff Report Election - Candidates.docx RESOLUTION NO. 6318

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

CARPINTERIA, CALIFORNIA, ADOPTING REGULATIONS FOR

CANDIDATES FOR ELECTIVE OFFICE PERTAINING TO

CANDIDATES' STATEMENTS SUBMITTED TO THE VOTERS AT AN
ELECTION TO BE HELD ON TUESDAY, NOVEMBER 5, 2024
WHEREAS, § 13307 of the Elections Code of the State of California provides that the governing body of any local agency adopt regulations pertaining to materials prepared by any candidate for a municipal election, including costs of the candidate's statement.

NOW, THEREFORE, BE IT RESOLVED as follows:

SECTION 1. The above recitals are true and correct, and incorporated herein by reference.

SECTION 2. GENERAL PROVISIONS. The Carpinteria City Council hereby resolves that pursuant to §13307 of the Elections Code of the State of California, each candidate for elective office to be voted for at an Election to be held in the City of Carpinteria on November 5, 2024 may prepare a candidate's statement on an appropriate form provided by the City Clerk. The statement may include the name, age and occupation of the candidate and a brief description of no more than 200 words of the candidate's education and qualifications expressed by the candidate himself or herself. The statement shall not include party affiliation of the candidate, nor membership or activity in partisan political organizations. The statement shall be filed in typewritten form in the office of the City Clerk at the time the candidate's nomination papers are filed. The statement may be withdrawn, but not changed, during the period for filing nomination papers and until 5:00 p.m. of the next working day after the close of the nomination period.

SECTION 3. FOREIGN LANGUAGE POLICY.

A. Pursuant to the Federal Voting Rights Act, candidate statements will be translated into all languages required by the County of Santa Barbara. The County is required to translate candidate's statements into the following languages: Spanish.

B. The County will print and mail voter information guides and candidates' statements to all voters in Spanish or the County will mail separate voter Resolution No. 6318

Page 2 ends

information guides and candidates' statements in Spanish to only those voters who are on the County voter file as having requested a voter information guide in a particular language. The County will make the voter information guides and candidates' statements in the required languages available at all polling places/vote centers, on the County's website, and in the Elections Official's office.

SECTION 4. PAYMENT.

A. Translations:

The candidate shall be required to pay for the cost of translating the candidate's statement into any required foreign language as specified in (A) and/or (B) of Section 3 above pursuant to Federal and/or State law.

B. Printing:

1. The candidate shall be required to pay for the cost of printing the candidate's statement in English in the main voter pamphlet.

2. The candidate shall be required to pay for the cost of printing the candidate's statement in a foreign language required in Section 3 above, in the main voter pamphlet.

The City Clerk shall estimate the total cost of printing, handling, translating, and mailing the candidate's statements· filed pursuant to this section, including costs incurred as a result of complying with the Voting Rights Act of 1965 (as amended), and require each candidate filing a statement to pay in advance to the local agency his or her estimated pro rata share as a condition of having his or her statement included in the voter's pamphlet. The estimate is just an approximation of the actual cost that varies from one election to another election and may be significantly more or less than the estimate, depending on the actual number of candidates filing statements. Accordingly, the City Clerk is not bound by the estimate and may, on a pro rata basis, bill the candidate for additional actual expenses or refund any excess paid depending on the final actual cost.

In the event of underpayment, the City Clerk shall require the candidate to pay the balance of the cost incurred. In the event of overpayment, the City Clerk shall prorate the excess amount among the candidates and refund the excess amount paid within 30 days of the election.

SECTION 5. MISCELLANEOUS.

A. All translations shall be provided by professionally-certified translators.

B. The City Clerk shall allow (bold type) (underlining) (capitalization) (indentations) (bullets) (leading hyphens) to the same extent and manner as allowed in previous City elections and according to law.

C. The City Clerk shall comply with all recommendations and standards set forth by the California Secretary of State regarding occupational Resolution No. 6318

Page 3 ends

designations and other matters relating to elections.

SECTION 6. ADDITIONAL MATERIALS. No candidate will be permitted to include additional materials in the voter information guide.

SECTION 7. That the City Clerk shall provide each candidate or the candidate's representative a copy of this Resolution at the time nominating petitions are issued.

SECTION 8. That all previous resolutions establishing council policy on payment for candidates' statements are repealed.

SECTION 9. That this resolution shall apply only to the election to be held on November 5, 2024 and shall then be repealed.

SECTION 10. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions.

PASSED, APPROVED AND ADOPTED on this 28th day of May, 2024, by the following vote:

AYES: COUNCILMEMBER(S):

NOES: COUNCILMEMBER(S):

ABSENT: COUNCILMEMBER(S):

ABSTAIN: COUNCILMEMBER(S):

Mayor, City of Carpinteria
ATTEST:

Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
Resolution No. 6318
Page4
I hereby certify that the foregoing resolution was adopted at a regular meeting of the City Council of the City of Carpinteria held on May 28, 2024.

Brian C. Barrett, CMG, CPMC
City Clerk, City of Carpinteria
APPROVED AS TO FORM:

Jena Shoaf Acos, on behalf of Brownstein
Hyatt Farber Schreck, LLP acting as
City Attorney of the City of Carpinteria
City of Carpinteria
Cour.rcr- AceruoR Srarr Reponr
May 28,2024

ITEM FOR COUNCI L CONSIDERATION
Placement of a proposed measure to increase the rate of the City's Transient Occupancy Tax from twelve percent (12%) to fifteen percent (15%) on the November 2024 ballot.

STAFF MENDATION

1. Adopt Resolution No. 6320, ordering the submission to the qualified electors of the City of a certain measure relating to increasing the rate of the City's Transient .Occupancy Tax at the General Election to be held on Tuesday, November 5,2024, as called by Resolution No. 6317;

2. Adopt Resolution No. 6321, requesting the Board of Supervisors of the County of Santa Barbara to consolidate a General Municipal Election to be held on November 5,2024, with the Statewide General Election to be held on the date pursuant to $ 10403 of the Elections Code;

3. Adopt Resolution No. 6322, setting priorities for filing written argument(s) regarding a City measure and directing the City Attorney to prepare an impartial analysis;

4. Adopt Resolution No. 6323, providing for the filing of rebuttal arguments for City measures submitted at municipal elections.

Samole Motion : I move to adopt Resolution Nos. 6320 through 6323, as read by title only, all concerning the requisite actions associated with placing a proposed measure to increase the rate of the City's Transient Occupancy Tax on the ballot for the November 5,2024 General Municipal Election. (Requires a two-thirds vote to pass.)

BACKGROUND
Transient Occupancy TaX
The Transient Occupancy Tax ("TOT") is the technical name for the tax imposed on occupants staying thirty (30) days or less in hotels, motels, and other similar lodgings. lt is also commonly known as a "hotel tax" or a "bed tax." lmposition of a TOT, as well as 28724652.2
Agenda Item No. 10
November 5,2024 General Municipal Election Matters
May 28,2024
Page2
an extension or increase in TOT rates, must be approved by the voters. TOT is applied to a customer's rent, and not on the business that conducts the lodging.

The revenues generated by the TOT increase will be used for any government purpose and not legally restricted to any specific purpose. Therefore, the TOT increase is a "general tax," which only requires a simple majority, or 50% plus one, voter approval. A "special tax," by contrast, is legally restricted for a specific use and requires a supermajority, or twothirds voter approval, to pass. General tax measures may only be placed on the ballot during a regularly scheduled general election of the City, except in the case of an emergency. This means the TOT tax measure would need to be scheduled for November 5, 2024, or it would need to wait until November 3,2026.

The City's TOT regulations are found in Chapter 3.20 of the Carpinteria Municipal Code ("CMC';.t The City currently imposes a 12o/o hotel tax and is proposing to increase the tax by 3%.2 This increase is expected to generate $750,000 annually to contribute to the generalfund until ended by voters, thereby maintaining fiscal sustainability and essential services. Allfunds would be confined to use within the City, and will require certain audits and disclosures. Ordinance No. 780, which is attached and incorporated into Resolution Nos. 6320 and 6321, is the full text of the Ordinance amendment increasing TOT that is to be submitted to the voters.

Council Direction and Consideration of Potential Transient Occupancy Tax [OT) Ballot Measure
The City's adopted 2024 Annual Work Plan includes Primary Goal #3 - "Take Steps to Address the Fiscal Sustainability of the City." As part of this goal, the City Council directed staff to explore new revenue sources to help maintain current service levels and programs while also meeting the demand of the City's growing infrastructure maintenance and improvement needs.

Given this direction from the City Council, staff began to explore a potential TOT ballot measure for the November 5,2024 General Municipal Election. A request for proposals was released for professional polling and public opinion research related to a possible TOT measure. FM3's proposal was selected based on its cost-competitiveness and how it closely aligned with the City's specific needs.3
1 Additionally, CMC Section 14.08.562 subjects short-term rentals (STRs) to pay fees and/or taxes, including TOT to the City.
2 Like Carpinteria, the TOT rates for Santa Barbara County, Santa Barbara City, Goleta, and Solvang are all currently at 12%.lt should be noted that the City of Goleta, City of Santa Barbara and portions of the southern Santa Barbara County unincorporated area also fallwithin the Santa Barbara South Coast Tourism Business lmprovement District (TBID)which imposes an additional2o/o TBID assessment. Both Buellton and Solvang are considering increasing their TOT rates from 12oh to 14o/o this November.

Additionally, the Santa Barbara County Board of Supervisors will consider placing a TOT increase measure on their ballot next month at its June 4 meeting. 3 FM3 also consulted with the City on Measures X (2018localsales tax measure) and the 2012TOT increase.

G:\CC Staff ReportsVl24 O528\Draft\Election - TOT Measure\Jena Edits - 5-24-24\CARP- Staff Report Election - TOT Measu re(287 24652.2).docx
28724652.2
November 5,2024 General Municipal Election Matters
May 28,2024

Page 3 ends

Carpinteria's Revenue Needs
The City Council is aware of the financial constraints caused by the COVID-19 pandemic, from which the City has been unable to fully recover. Combined with rising costs due to inflation and the growing demands to maintain and expand service levels throughout Carpinteria, these factors have strained the City's budget. As the City has matured, the public expects a high level of services and continued investment in the community.

Unfunded state mandates and rising public safety costs have further compounded these financial challenges. Council and staff have been extremely resourceful in meeting needs by aggressively pursuing grants and other sources of onetime funding. However, significant unmet public needs remain, and the lack of sufficient revenue to address these needs and community priorities affects the City's ability to tackle longterm challenges.

The City faces significant financial hurdles on multiple fronts:

Rising Gosts of Law Enforcement: The escalation in costs associated with the City's current agreement with the Santa Barbara County Sheriffs Office, Agreement No. 2023-037, City of Carpinteria Contract Law Enforcement Seruices for FY 2023/2024 - FY 2026/2027, presents a substantial challenge. The cost for law enforcement service during the fiscal year ("FY") 202312024 is approximately $6.1 million which is an increase of over $1,000,000 from the previous FY's costs.

By the final year of the current agreement (FY 202612027), the City's annual cost for law enforcement services will be $7.2 million.
o
Rising Operational Costs: The rising operational expenses of City services due to inflation and other macroeconomic factors (i.e., high federal interest rates), including staffing and program costs for new initiatives such as the City library, Senior Programming, City parks including the newly developed Skate Park, add to the financial strain. Existing programs continue to be subsidized by the general fund. The Community Pool represents the greatest single facility operating cost, with revenue from all user charges estimated to be less than 50% of pool operating costs.

Reduction in Revenue: The City's main sources of revenue including sales tax, localtax (Measure X), property tax and transient occupancy tax are plateauing and are not rising to match the City's rising expenditures. a Rising Capital lmprovement Program (GlP) Gosts: The City has experienced rising CIP costs due to project bids coming in significantly higher than the engineer's estimate. The City's costs for maintaining roads and other capital projects are higher than historical values due to rising labor costs (labor shortages, high cost of living, smaller market), material cost increases (supply chain issues and inflation), regulatory costs and increased demand for contractor services.

G:\CC Staff ReportsVl24 O528\Draft\Election - TOT Measure\Jena Edits - 5-24-24\CARP_ Staff Report Election - TOT Measure(287 24652.2).docx
28724652.2
a
November 5, 2024 General Municipal Election Matters
May 28,2024

Page 4 ends

The purpose of this agenda matter is for the Council to consider adopting Resolution Nos. 6320 through 6323 concerning the requisite actions associated with placing a proposed measure to increase the rate of the City's Transient Occupancy Tax on the ballot for the November 5,2024 General Municipal Election.

DISCUSSION
Results of the Ma rah 2024 Pollino
The survey conducted by FM3 garnered 341 responses. The survey was conducted by phone in in both English and Spanish from March 24to April 1 ,2024.

Survey results indicate that two-thirds of Carpinteria voters perceive that the City needs additional funding and that more than three-quarters of voters support a TOT measure, far exceeding the majority vote threshold necessary for passage. The survey responses also suggest that voter support increases with an understanding that TOT is paid only by hotel visitors and that it is a strictly local revenue source that cannot be taken by the State.

Election Procedures
To place the TOT measure on the November 5, 2024, ballot, the Council must adopt Resolution Nos. 6320 through 6323 by a 213 vote of all members of the City Council.a Should a measure to increase the TOT by 3%, raising the rate to 15o/o, be placed on the ballot in November 2024, it would require a majority vote (50% + 1) of the Carpinteria registered voters to pass.

Elections Code Section 10403 provides that whenever an election called by a city for the submission of a question, proposition, or office to be filled is to be consolidated with a Statewide Election, and the question, proposition or office to be filled is to appear on the same ballot as that provided for in the Statewide Election, the city shall file with the Board of Supervisors a resolution of its governing board requesting consolidation. The resolution requesting consolidation must be filed at least 88 days prior (August 9, 2024) to the date of the election. However, the County of Santa Barbara Board of Supervisors will be in summer recess from July 23,2024 to August 13,2024, and their last meeting before this deadline is July 16,2024. Hence, the deadline to submit a consolidation request to the Clerk of the Board is July 3,2024.
ln addition, the resolution calling for the election and the resolution providing for the submission of rebuttal arguments must be adopted at the same time as the resolution requesting consolidation (Elections Code Sections 9285(b), 10403.) ln association with any City measures approved to be placed on a ballot for a local election, the Election Code requires a city to approve the title and question to be placed a Government Code Section 53724(b)
G:\CC Staff Reports\2024 0528\Draft\Election - TOT Measure\Jena Edits - 5-24-24\CARP_ Staff Report Election - TOT Measu re(287 24652.2).docx
28724652.2
November 5,2024 General Municipal Election Matters
May 28,2024

Page 5 ends

on the ballot; the City Attorney to prepare an impartial analysis of the measure; the city to comply with rules concerning the filing and selecting of arguments for and against the measure; and the City to establish rules for rebuttal arguments, should the city wish to allow them.

Draft Ballot Measure Language
Staff proposes the following ballot language
City of Carpinteria Essential Seruiceg Public Safety Measure Shall the measure protecting essentia/ seryices including maintaining safe/clean public areas; repairing sfreefs; addressing homelessness,' emergency/disaster preparedness; maintaining sheriff's deputies; preseruing library, senior, and youth programs; protecting beaches from pollution; other general government purposes; increasing Carpinteria's transient occupancy tax, paid only by hotel/motel/shortterm rental guesfg from 12% to 15%o, generating $750,000 annually until ended by voters, requiring spending disclosures, allfunds spent locally, be adopted? Next Steps
lf the City Council chooses to move forward with placing a proposed measure to increase the City's Transient Occupancy Tax on the ballot for the November 5, 2024 General Municipal Election, the following timeline will apply:

Dates Description
May 28, 2024 City Council vote to place the TOT measure on the November 5, 2024 ballot (requires supermaioritv vote @15\ of the Citv Council) June 2024 -
October 2024 Public information and outreach
July 3, 2024
Deadline to file with the Santa Barbara County Clerk of the Board of Supervisors request for consolidation services for the Novembe r 5, 2024 election.

August 1,2024
Deadline for submittal of arguments for and/or against proposed TOT measure
Deadline for Citv Attornev impartial analvsis
Auqust 12.2024 Deadline for rebuttal arguments
November 5,2024 Election Day

POLICY CONSISTENCY
The proposed actions are consistent with the City's adopted 2024 Annual Work Plan which includes Primary Goal #3 - "Take Steps to Address the Fiscal Sustainability of the City."
G:\CC Staff ReportsBl24 }s29\Draft\Election - TOT Measure\Jena Edits - 5-24-24\CARP_ Staff Report Election - TOT Measure(28724652.2).docx
28724652.2
November 5,2024 General Municipal Election Matters
May 28,2024

Page 6 ends

The proposed actions related to setting the City's municipal election are consistent with County policies and procedures and State law. Also, the proposed consolidated election is consistent with the City's interest in efficient use of public resources.

FINANCIAL CONSI DERATIONS
The election costs by consolidating with the County are considerably less than they would be if the City held a "stand-alone" election. The Santa Barbara County Elections Office has estimated that it will cost approximately $14,000 to place the TOT measure on the ballot. This amount will be included in the Proposed 2024-25 Fiscal Year Budget that staff will present to the Council in June. No Additional Funding Requested. There is sufficient budget in 101 -132-5201 - Professional Services.

LEGAL AND RISK MANAG MENT CONSIDERATIONS
The City Attorney has assisted in the preparation of the attached resolutions and ordinance and will be available to answer questions at the meeting. The following provides guidance regarding the timing and procedure for approval of said resolutions.

OPTIONS

1. Adopt the Resolutions as submitted (Staff Recommendation).

2. Amend the Resolutions, provided all requirements of the Elections Code are met, and adopt the Resolutions as amended.

3. Do not adopt the Resolutions and provide direction to staff as appropriate.

PRINCIPAL PARTIES EXPECTED AT MEETING
There are no principal parties expected at the meeting

ATTACHMENTS
Resolution No.6320
Resolution No.6321
Resolution No.6322
Resolution No.6323
Staff contact:

Brian C. Barrett, City Clerk
(805) 7 55-4403; [email protected]
Reviewed by: Michael Ramirez, City Manager
(805) 7 55-4450, [email protected] Signature
G:\CC Staff Reports\2024 O528\Draft\Election - TOT Measure\Jena Edits - 5-24-24\CARP- Staff Report Election - TOT Measure(287 24652.2).docx
28724652.2
A.

B.
c.

D

ATTACHMENT A
RESOLUTION NO. 6320

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

CARPINTERIA, CALIFORNIA, ORDERING THE SUBMISSION TO

THE QUALIFIED ELECTORS OF THE CITY OF A CERTAIN

MEASURE RELATING TO INCREASING THE RATE OF THE

CITY'S TRANSIENT OCCUPANCY TAX AT THE GENERAL
ELECTION TO BE HELD ON TUESDAY, NOVEMBER 5, 2024
WHEREAS, pursuant to Title 3 (Revenue and Finance) of the Carpinteria Municipal Code ('CMC"), the City of Carpinteria currently imposes a Transient Occupancy Tax (.TOT') at the rate of twelve percent (12o/o) on short-term guests of hotels, motels, and other lodgings within the City;
WHEREAS, the City Council desires to amend the CMC to increase the maximum rate of the TOT from twelve percent (12o/o) to fifteen percent (15%); WHEREAS, pursuant to California Elections Code Section 9222 and California Revenue and Taxation Code Sections 7280 and7281, the City Council has the authority to place a measure on the ballot regarding the imposition, extension or increase in a local TOT to be considered by the voters at a municipal election; WHEREAS, TOT is a general tax, the proceeds of which are deposited in the City's General Fund and pay for essential City services, including but not limited to, Sheriff deputies, street repair, maintenance of library, senior and youth programs, and other general governmental services;
WHEREAS, Proposition 218 (California Constitution, Article Xlll C and D) requires that all general taxes that are imposed, extended or increased be submitted to the electorate and approved by a majority vote of the qualified electors voting in the election;
WHEREAS, pursuant to the CMC Section 2.06.040, the City's regular General Municipal Election for officers is held on the first Tuesday after the first Monday in November of each even-numbered year. Therefore, the next regularly scheduled General Municipal Election for the election of members of the City Council will be held on Tuesday, November 5,2024;
WHEREAS, based on the above, the City Council desires to submit a ballot measure to the voters at said upcoming General Municipal Election that proposes to increase the City's TOT from 12% to 15% ("Measure"), the specific terms of which are provided for in Ordinance No. 780 attached hereto as Exhibit "A" and by this reference made an operative part hereof, in accordance with all applicable laws; 28724656.3
Resolution No. 6320
Page2
WHEREAS, pursuant to Government Code Section 53724(b) (Proposition 62), twothirds of the City Council must vote in favor of placing the TOT Measure on the November 5,2024 General Municipal Election ballot;
WHEREAS, it is desirable that the General Municipal Election be consolidated with the Statewide General Election held on the same date and that within the City the precincts, polling places, voting centers and election officers of the two elections be the same, and that the Santa Barbara County Elections Department canvass the returns of the General Municipal Election and that the election be held in all respects as if there were only one election;
WHEREAS, it is also desirable to establish deadlines and rules for the submission of written arguments and rebuttals for and against the Measure, and a City Attorney impartial analysis, in accordance with California Elections Code procedures, which shall be embodied in separate resolutions.

NOW, THEREFORE, BE lT RESOLVED as follows
SECTION 1. Recitals. The above recitals are true and correct, and incorporated herein by reference.

SECTION 2. Submission of Ballot Measure. The Carpinteria City Council pursuant to its right and authority, does order submitted to the qualified voters of the City at the General Municipal Election to be held on November 5,2024 the following question, which shall be printed on the ballots substantially in the form as shown:

CITY OF CARPINTERIA ESSENTIAL SERVICES,

PUBLIC SAFETY MEASURE
Shall the measure protecting essential services
including maintaining safe/clean public areas;
repairing streets; addressing homelessness;
emergency/d isaster prepa red ness; mai ntain ing
sheriffs deputies; preserving library, senior, and
youth programs; protecting beaches from pollution;
other general government purposes; increasing
Carpinteria's transient occupancy tax, paid only by
hotel/motel/short-term rental guests, from 12o/o to
15%, generating $750,000 annually until ended by
voters, requiring spending disclosures, all funds
spent locally, be adopted?
YES
NO
28724656.3
Resolution No. 6320

Page 3 ends

SECTION 3. Placement on the Ballot. The full text of the City's TOT Measure (Ordinance No. 780) is attached hereto as "Exhibit A" and incorporated herein by reference. The full text of the Measure shall not be printed in the Voter lnformation guide, and a statement shall be printed in the ballot pursuant to Elections Code Section 9223 advising voters that they may obtain a copy of Ordinance No. 780 at no cost, upon request made to the City Clerk or by visiting the City's website.

SECTION 4. Majoritv Vote Required to Pass. The vote requirement for the TOT Measure to pass is a majority (50%+1) of the votes cast.

SECTION 5. Public Examination. Pursuant to Elections Code Section 9295, the Ordinance Measure will be available for public examination for no fewer than ten (10) calendar days prior to being submitted for printing in the Voter lnformation guide. The City Clerk shall post notice in the Clerk's office of the specific dates that the examination period will run.

SECTION 6. Conduct of Election in Conformity with Law. That in all particulars not recited in this Resolution, the election shall be held and conducted as provided by law for holding municipal elections.

SECTION 7. CEQA. The City Council hereby finds and determines that the ballot Measure relates to organizational or administrative activities of government that will not result in direct or indirect physical changes in the environment, and therefore is not a Project within the meaning of the California Environmental Quality Act ("CEQA") and the State CEQA Guidelines Section 15378(bX5).

SECTION 8. Notice and Publication. That notice of the time and place of holding the election is given, and the City Clerk is hereby directed to publish a synopsis of the Measure in accordance with California Elections Code Section 12111at least one time no later than one week before the election in a newspaper of general circulation in the City. The City Clerk is authorized, instructed and directed to give further or additional notice of the election, in time, form and manner as may be required by law.

SECTION 9. Certification. That the City Clerk shall certify to the passage and adoption of this Resolution and enter it into the book of original resolutions.

SECTION 10. Delivery to County. The City Clerk is directed to deliver copies of this Resolution and its attachments to the Clerk of the Santa Barbara County Board of Supervisors and to the Santa Barbara County Elections Official, and is authorized to execute, file, sign, communicate and do whatever is othenruise necessary to effectuate the placement of City's TOT Measure on the November 5, 2024 ballot.

PASSED, APPROVED AND ADOPTED on this 28th day of May, 2024, by the following vote:

AYES: COUNCILMEMBER(S):
28724656.3
Resolution No. 6320

Page 4 ends

NOES: coUNcTLMEMBER(S):
couNcTLMEMBER(S):
coUNcTLMEMBER(S):

ABSENT

ABSTAIN
Mayor, City of Carpinteria
ATTEST
Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
I hereby certify that the foregoing resolution was adopted at a regular meeting of the City Council of the City of Carpinteria held on May 28,2024.

Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
APPROVED AS TO FORM:

Jena Shoaf Acos, on behalf of Brownstein
Hyatt Farber Schreck, LLP acting as
City Attorney of the City of Carpinteria
ATTACHMENT:

Exhibit "A" - Ordinance No. 780
28724656.3
Resolution No. 6320

Page 5 ends

EXHIBIT A TO RESOLUTION NO. 6320
Ordinance No. 780
28724656.3
ORDINANCE NO.78O

AN ORDINANCE OF THE CITY OF CARPINTERIA, CALIFORNIA,
AMENDING SECTION 3.20.030 OF THE CARPINTERIA MUNICIPAL

CODE TO INCREASE THE UNIFORM TRANSIENT OCCUPANCY TAX

ON RENT CHARGED TO HOTEL GUESTS FROM TWELVE PERCENT
(12Tol TO FIFTEEN PERCENT (15%) EFFECTTVE JANUARY 1,2025 WHEREAS, pursuant to California Revenue and Taxation Code Section 7280, the City of Carpinteria ("City") levies an transient occupancy tax on short-term hotel stays in the City, as regulated under Chapter 3.20 ("Uniform Transient Occupancy Tax") of Title 3 ("Revenue and Finance") of the Carpinteria Municipal Code ("CMC"); WHEREAS, on May 28, 2024, through the adoption of Resolution No. 6320 by a twothirds (213) majority vote of all members of the City Council as required by Government Code Section 53724(b), the City Council resolved to submit this Ordinance to the qualified voters of the City at the November 5, 2024 General Municipal Election; WHEREAS, this Ordinance imposes an additional three percent (3%) tax to the existing twelve percent (12o/o) transient occupancy tax ("TOT"), thereby increasing the TOT to fifteen percent (15%); and,
WHEREAS, this Ordinance is anticipated to raise an additional $750,000 in revenue annually, for deposit to the City's general fund and used for any general governmental purpose within the City.

NOW THEREFORE, THE PEOPLE OF THE CITY OF CARPINTERIA DO HEREBY ORDAIN AS FOLLOWS:

SECTION 1. lncorporation of Recitals. All the foregoing recitals are true and correct and are each relied upon independently by the People for its adoption of this Ordinance.

SECTION 2. Text Amendment. Subject to the approval of a majority of the qualified voters of the City of Carpinteria at the November 5, 2024 General Municipal Election, Section 3.20.030 of Chapter 3.20 of Title 3 of the CMC is hereby amended to read as follows, with additions noted in bold italics and deletions noted in strikeeut:
"3.20.030 - Tax imposed-Rate-Debt to city
For privilege of occupancy in any hotel, each transient is subject to and shall pay a tax in the amount of $ryelve fifteen percent of the rent charged by the operator.

Such tax constitutes a debt owed by the transient to the city which is extinguished only by payment to the operator or the city."
SEGTION 3. GeneralTax. The TOT assessed by this Ordinance shall be collected and administered in the manner set forth in Chapter 3.20 of the CMC. Said tax is a general tax as defined in Subsection (a) of Section 1 of Article XlllC of the California Constitution, 2872465',t.3
Ordinance No. 780
Page2
the proceeds of which shall be deposited in the City's general fund to be used for any lawful general purposes of the City, including but not limited to, maintaining safe/clean public areas; repairing streets; addressing homelessness; emergency/disaster preparedness; maintaining sheriffs deputies; preserving library, senior, and youth programs; and protecting beaches from pollution.

SECTION 4. Approval by the City Council. Pursuant to California Government Section 53724 and Revenue and Taxation Code Section 7280, this Ordinance was duly approved for placement on the ballot by a minimum two-thirds (2/3) majority of all members of the City Council on May 28, 2024.

SECTION 5. Approval by Voters and Effective Date. Pursuant to California Constitution Article XlllC Section 2(b) and California Elections Code Section 9217, this Ordinance shall take effect only if approved by a majority of the eligible voters of the City of Carpinteria voting at the General Municipal Election to be held on November 5,2024.

It shall be deemed adopted when the City Council has certified the results of that election by resolution and shall take effect ten (10) days thereafter.

SECTION 6. Severabilitv. lf any section, subsection, sentence, clause, phrase, or portion of this Ordinance is for any reason held to be invalid or unenforceable by a court of competent jurisdiction, the remaining portions of this Ordinance shall nonetheless remain in full force and effect. The People of the City of Carpinteria hereby declare that they would have adopted each section, subsection, sentence, clause, phrase, or portion of this Ordinance, irrespective of the fact that any one or more sections, subsections, sentences, clauses, phrases, or portions of this Ordinance be declared invalid or unenforceable.

SECTION 7. Execution. The Mayor and the City Clerk are hereby authorized to sign and attest to the adoption of this Ordinance upon certification by the City Council of the results of the election approving this Ordinance.

I hereby certify that the foregoing Ordinance was duly adopted by a majority of the qualified electors of the City of Carpinteria casting votes on the question in the General Municipal Election held on November 5,2024, by the following electoral results:

VOTES IN FAVOR

VOTES AGAINST
ATTEST:
28724651.3
Mayor of the City of Carpinteria
Ordinance No. 780

Page 3 ends

Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
APPROVED AS TO FORM:

Jena Shoaf Acos, on behalf of Brownstein
Hyatt Farber Schreck, LLP acting as
City Attorney of the City of Carpinteria
2872465',t.3

ATTACHMENT B
RESOLUTION NO.6321

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

CARPINTERIA, CALIFORNIA, REQUESTING THE BOARD OF

SUPERVISORS OF THE COUNTY OF SANTA BARBARA TO

CONSOLIDATE A GENERAL MUNICIPAL ELECTION TO BE HELD ON
NOVEMBER 5, 2024, WITH THE STATEWIDE GENERAL ELECTION
TO BE HELD ON THE DATE PURSUANT TO S 10403 OF THE

ELECTIONS CODE
WHEREAS, the City Council of the City of Carpinteria has called a General Municipal Election to be held on November 5,2024, for the purpose of electing Councilmembers (Resolution No. 6317) and submitting to the voters the question relating to increasing the rate of the City's transient occupancy tax (Resolution No 6320); and
WHEREAS, it is desirable that the General Municipal Election be consolidated with the Statewide General Election to be held on the same date and that within the city the precincts, polling places (vote centers) and election officers of the two elections be the same, and that the Santa Barbara County Elections/Registrar of Voters canvass the returns of the General Municipal Election and that the election be held in all aspects as if there were only one election.

NOW, THEREFORE, BE lT RESOLVED as follows:

SECTION 1. The above recitals are true and correct, and incorporated herein by reference.

SECTION 2. The Carpinteria City Council hereby resolves that pursuant to the requirements of S 10403 of the Elections Code, the Board of Supervisors of the County of Santa Barbara is hereby requested to consent and agree to the consolidation of a General Municipal Election with the Statewide General Election on Tuesday, November 5, 2024, for the purpose submitting the question relating to increasing the rate of the City's transient occupancy tax to the qualified voters of the City.

SECTION 3. That a measure is to appear on the ballot as follows 28726391.3
Resolution No. 6321
Page2

CITY OF CARPINTERIA ESSENTIAL

SERVICES, PU BLIC SAFETY
Shall the measure protecting essential services
including maintaining safe/clean public areas;
repairing streets; addressing homelessness;
emergency/d isaster prepared ness ; mai nta i n ing
sheriffs deputies; preserving library, senior, and
youth programs; protecting beaches from
pollution; other general government purposes;
i ncreasi ng Ca rpi nteria's transient occu pancy tax,
paid only by hotel/motel/short-term rental guests,
from 12o/o to 15%, generating $750,000 annually
until ended by voters, requiring spending
disclosures, allfunds spent locally, be adopted?
YES
NO
SECTION 4. That the proposed complete text of the measure (Ordinance No. 780) submitted to the voters is attached as Exhibit A.

SECTION 5. That the vote requirement for the measure to pass is a majority (50%+1) of the votes cast.

SECTION 6. That the County Elections Office is authorized to canvass the returns of the General Municipal Election. The election shall be held in all respects as if there were only one election, and only on form of ballot shall be used. The election will be held and conducted in accordance with the provisions of law regulating the statewide or special election.

SECTION 7. That the Board of Supervisors is requested to issue instructions to the County Elections Department to take any and all steps necessary for the holding of the consolidated election.

SECTION 8. That the City of Carpinteria recognizes that additional costs will be incurred by the County by reason of this consolidation and agrees to reimburse the County for any costs.

SECTION 9. That the City Clerk is hereby directed to file a certified copy of this resolution with the Board of Supervisors and the County Election Department of the County of Santa Barbara.

SECTION 10. That the City Clerk shall certify to the passage and adoption of this resolution and enter it into the book of original resolutions. 2872639',t.3
Resolution No. 6321

Page 3 ends

PASSED, APPROVED AND ADOPTED on this 28th day of May, 2024, by the following vote:

AYES: COUNCILMEMBER(S):

NOES: COUNCILMEMBER(S):

ABSENT: COUNCILMEMBER(S):

ABSTAIN: COUNCILMEMBER(S):

Mayor, City of Carpinteria
ATTEST
Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
I hereby certify that the foregoing resolution was adopted at a regular meeting of the City Council of the City of Carpinteria held on May 28, 2024.

Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
APPROVED AS TO FORM:

Jena Shoaf Acos, on behalf of Brownstein
Hyatt Farber Schreck, LLP acting as
City Attorney of the City of Carpinteria
28726351 .3
Resolution No. 6321

Page 4 ends

EXHIBIT A TO RESOLUTION NO. 6321
Ordinance No. 780
28726391 .3
ORDINANCE NO.78O

AN ORDINANCE OF THE CITY OF CARPINTERIA, CALIFORNIA,
AMENDING SECTION 3.20.030 OF THE CARPINTERIA MUNICIPAL

CODE TO INCREASE THE UNIFORM TRANSIENT OCCUPANCY TAX

ON RENT CHARGED TO HOTEL GUESTS FROM TWELVE PERCENT
(12o/ol TO FIFTEEN PERCENT (15%) EFFECTTVE JANUARY I ,2025 WHEREAS, pursuant to California Revenue and Taxation Code Section 7280,the City of Carpinteria ("City") levies an transient occupancy tax on shortterm hotel stays in the City, as regulated under Chapter 3.20 ("Uniform Transient Occupancy Tax") of Title 3 ("Revenue and Finance") of the Carpinteria Municipal Code ("CMC"); WHEREAS, on May 28, 2024, through the adoption of Resolution No. 6320 by a two-thirds (2/3) majority vote of all members of the City Council as required by Government Code Section 53724(b), the City Council resolved to submit this Ordinance to the qualified voters of the City at the November 5, 2024 General Municipal Election; WHEREAS, this Ordinance imposes an additional three percent (3%) tax to the existing twelve percent (12o/o) transient occupancy tax ("TOT"), thereby increasing the TOT to fifteen percent (15%); and,
WHEREAS, this Ordinance is anticipated to raise an additional $750,000 in revenue annually, for deposit to the City's general fund and used for any general governmental purpose within the City.

NOW THEREFORE, THE PEOPLE OF THE CITY OF CARPINTERIA DO HEREBY ORDAIN AS FOLLOWS:

SECTION 1. lncorporation of Recitals. All the foregoing recitals are true and correct and are each relied upon independently by the People for its adoption of this Ordinance.

SECTION 2. Text Amendment. Subject to the approval of a majority of the qualified voters of the City of Carpinteria at the November 5,2024 General Municipal Election, Section 3.20.030 of Chapter 3.20 of Title 3 of the CMC is hereby amended to read as follows, with additions noted in bold italics and deletions noted in st+ikeeut:
'3.20.030 - Tax imposed-Rate-Debt to city
For privilege of occupancy in any hotel, each transient is subject to and shall pay a tax in the amount of hrue{ve fifteen percent of the rent charged by the operator.

Such tax constitutes a debt owed by the transient to the city which is extinguished only by payment to the operator or the city."
SECTION 3. GeneralTax. The TOT assessed by this Ordinance shall be collected and administered in the manner set forth in Chapter 3.20 of the CMC. Said tax is a general tax as defined in Subsection (a) of Section 1 of Article XlllC of the California Constitution, 28724651 .3
Ordinance No. 780
Page2
the proceeds of which shall be deposited in the City's general fund to be used for any lawful general purposes of the City, including but not limited to, maintaining safe/clean public areas; repairing streets; addressing homelessness; emergency/disaster preparedness; maintaining sheriffs deputies; preserving library, senior, and youth programs; and protecting beaches from pollution.

SECTION 4. Approval bv Citv Council. Pursuant to California Government Section 53724 and Revenue and Taxation Code Section 7280, this Ordinance was duly approved for placement on the ballot by a minimum two-thirds (213) majority of all members of the City Council on May 28, 2024.

SECTION 5. Approval bv Voters and Effective Date. Pursuant to California Constitution Article XlllC Section 2(b) and California Elections Code Section 9217, this Ordinance shall take effect only if approved by a majority of the eligible voters of the City of Carpinteria voting at the General Municipal Election to be held on November 5,2024.

It shall be deemed adopted when the City Council has certified the results of that election by resolution and shall take effect ten (10) days thereafter.

SECTION 6. Severabilitv. lf any section, subsection, sentence, clause, phrase, or portion of this Ordinance is for any reason held to be invalid or unenforceable by a court of competent jurisdiction, the remaining portions of this Ordinance shall nonetheless remain in full force and effect. The People of the City of Carpinteria hereby declare that they would have adopted each section, subsection, sentence, clause, phrase, or portion of this Ordinance, irrespective of the fact that any one or more sections, subsections, sentences, clauses, phrases, or portions of this Ordinance be declared invalid or unenforceable.

SECTION 7. Execution. The Mayor and the City Clerk are hereby authorized to sign and attest to the adoption of this Ordinance upon certification by the City Council of the results of the election approving this Ordinance.

I hereby certify that the foregoing Ordinance was duly adopted by a majority of the qualified electors of the City of Carpinteria casting votes on the question in the General Municipal Election held on November 5,2024, by the following electoral results:

VOTES IN FAVOR

VOTES AGAINST
ATTEST:
28724651.3
Mayor of the City of Carpinteria
Ordinance No. 780

Page 3 ends

Brian C. Barrett, CMC, CPMC
City Clerk, City of Carpinteria
APPROVED AS TO FORM:

Jena Shoaf Acos, on behalf of Brownstein
Hyatt Farber Schreck, LLP acting as
City Attorney of the City of Carpinteria
28724651.3

ATTACHMENT C
RESOLUTION NO. 6322

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

CARPINTERIA, CALIFORNIA, SETTING PRIORITIES FOR FILING

WRITTEN ARGUMENT(S) REGARDING A CITY MEASURE AND

DIRECTING THE CITY ATTORNEY TO PREPARE AN IMPARTIAL

ANALYSIS
WHEREAS, a General Municipal Election is to be held in the City of Carpinteria, California, on November 5, 2024, at which there will be submitted to the voters the following ballot question that proposes to increase the rate of the City's transient occupancy tax ("TOT"):

CITY OF CARPINTERIA ESSENTIAL

SERVICES, PUBLIC SAFETY MEASURE
Shall the measure protecting essential services
including maintaining safe/clean public areas;
repairing streets; addressing homelessness;
emergency/d isaster prepared ness ; mai nta i n in g
sheriffs deputies; preserving library, senior, and
youth programs; protecting beaches from
pollution; other general government purposes;
i ncreasi ng Ca rpi nteria's transient occu pancy tax,
paid only by hotel/motel/short-term rental guests,
from 12o/o to 15o/o, generating $750,000 annually
until ended by voters, requiring spending
disclosures, all funds spent locally, be adopted?
YES
NO
WHEREAS, the full text of the City's TOT measure is in Ordinance 780; WHEREAS, it is desirable to establish deadlines and rules for the submission of written arguments for and against the TOT measure, and a City Attorney impartial analysis, in accordance with California Elections Code procedures.

NOW, THEREFORE, BE lT RESOLVED as follows
SECTION 1. The above recitals are true and correct, and incorporated herein by reference.
28726396.2
Resolution No. 6322
Page2
SECTION 2. Arquments. Pursuant to Elections Code Section 9281 et seq., the City Council authorizes (1) the City Council or any member(s) of the City Council, (2) an individual voter who is eligible to vote on the measure, or (3) bona fide association of citizens, or (4) a combination of voters and associations, to file a written argument for or against the TOT Measure. The arguments shall be filed with the City Clerk no later than August 1 ,2024 by 5:00 P.M., signed and with the printed name(s) of the author(s) submitting it, or if submitted on behalf of an organization, the name of the organization, and the printed name and signature of at least one of its principal officers who is the author of the argument. Written arguments shall not exceed 300 words and must be accompanied by the Form of Statement To Be Filed By Author(s) of Arguments.

Arguments may be changed or withdrawn until and including the due date fixed herein, after which no arguments for or against the City measure may be submitted to the City Clerk. The City Clerk shall adhere to the Elections Code provisions in determining the priority of arguments for printing and distribution to voters, and shall take all necessary actions to cause the selected arguments to be printed and so distributed.

The City Council authorizes the following member(s) of its body to file a written argument and rebuttal [for/against] the TOT measure on behalf of the City Council, subject to the deadlines and rules set forth herein:

Councilmember(s) ln Favor Councilmember(s) Against
SECTION 3. Citv Attornev lmpartial Analvsis. The City Council directs the City Clerk to transmit a copy of the TOT measure to the City Attorney, who shall prepare an impartial analysis of it in accordance with Elections Code Section 9280. The impartial analysis shall be filed by the date set herein for the filing of primary arguments a. The City Attorney shall prepare an impartial analysis of the measure not exceeding 500 words showing the effect of the measure on the existing law and the operation of the measure.
b. The analysis shall include a statement indicating whether the measure was placed on the ballot by a petition signed by the requisite number of voters or by the governing body of the city.
c. ln the event the entire text of the measure is not printed on the ballot, nor in the voter information portion of the voter information guide, there shall be printed immediately below the impartial analysis, in no less than 10-point 28726396.2
Resolution No. 6322

Page 3 ends
← All documents from this meeting