FOR CASH ACCOUNT: 100-99-999-999-1010- FOR: All Except Stale CHECK # CHECK DATE TYPE VENDOR NAME UNCLEARED CLEARED BATCH CLEAR DATE 175503 10/03/2024 PRINTED 008415 A & M YBASKET INC. 15,000.00 175504 10/03/2024 PRINTED 007077 ADVANCED IMAGING STRATEGI 11,188.00 175505 10/03/2024 PRINTED 007254 ADVANTEC CONSULTING ENGIN 15,538.56 175506 10/03/2024 PRINTED 000797 ALESHIRE AND WYNDER LLP 230,740.95 175507 10/03/2024 PRINTED 000042 ALIN PARTY SUPPLY CO 242.37 175508 10/03/2024 PRINTED 006506 ALL IN ONE PARTIES 185.00 175509 10/03/2024 PRINTED 007004 ALLTECH INDUSTRIES INC 53,717.08 175510 10/03/2024 PRINTED 005523 AMAZON CAPITAL SERVICES 965.99 175511 10/03/2024 PRINTED 008124 AMERICAN RAMP COMPANY 15,600.00 175512 10/03/2024 PRINTED 000495 AMERICAN SOCCER CO INC 8,216.22 175513 10/03/2024 PRINTED 006675 AMERICAN TRANSPORTATION S 1,068.14 175514 10/03/2024 PRINTED 000543 AQUA FLO SUPPLY 916.66 175515 10/03/2024 PRINTED 000568 ATKINSON, ANDELSON, LOYA, 5,495.00 175516 10/03/2024 PRINTED 008194 BARRIOS & ASSOCIATES, LLC 23,225.00 175517 10/03/2024 PRINTED 000697 BIG ANDYS TROPHIES AND PL 1,026.98 175518 10/03/2024 PRINTED 003981 BIOMETRICS 4 ALL INC 11.25 175519 10/03/2024 PRINTED 003126 BLOOMING FLOWERS 1,234.80 175520 10/03/2024 PRINTED 001438 BLUE DIAMOND MATERIALS 106.04 175521 10/03/2024 PRINTED 004165 CALIFORNIA CONSULTING 5,000.00 175522 10/03/2024 PRINTED 000079 CALIFORNIA WATER SERVICE 80,105.71 175523 10/03/2024 PRINTED 007161 CARLOS ALBERTO GUERRA 100.00 175524 10/03/2024 PRINTED 001489 CHOURA VENUE SERVICES 11,548.47 175525 10/03/2024 PRINTED 001489 CHOURA VENUE SERVICES 7,498.01 175526 10/03/2024 PRINTED 001489 CHOURA VENUE SERVICES 1,502.55 175527 10/03/2024 PRINTED 001489 CHOURA VENUE SERVICES 2,002.45 175528 10/03/2024 PRINTED 004947 CINDY'S JUMPERS 1,500.00 175529 10/03/2024 PRINTED 008033 CLARENCE JOHNSON 100.00 175530 10/03/2024 PRINTED 000803 CLEAN ENERGY 2,902.26 175531 10/03/2024 PRINTED 001311 LOUIS JOSEPH COGUT 50.00 175532 10/03/2024 PRINTED 008325 COLOR CARD ADMINISTRATOR, 441.60 175533 10/03/2024 PRINTED 001381 COMPLETE OFFICE 678.48 175534 10/03/2024 PRINTED 004227 CONNIE DELA CRUZ-MANIO 50.00 175535 10/03/2024 PRINTED 007159 CORODATA RECORDS MANAGEME 577.55 175536 10/03/2024 PRINTED 000259 CROWN TROPHY OF CYPRESS 1,800.30 175537 10/03/2024 PRINTED 007846 CUSTOM SIGNS, INC. 491.15 175538 10/03/2024 PRINTED 000127 CALIFORNIA NEWSPAPERS PAR 1,311.03 175539 10/03/2024 PRINTED 007176 DAVEY COACH SALES INC. 613.75 175540 10/03/2024 PRINTED 007163 DIANNE THOMAS 100.00 175541 10/03/2024 PRINTED 006465 LOUIE DIAZ 100.00 175542 10/03/2024 PRINTED 006482 FREDERICK DOCDOCIL 100.00 175543 10/03/2024 PRINTED 007595 DONNIE R. DORSEY 50.00 175544 10/03/2024 PRINTED 007713 DORCAS A. WADDIS 50.00 175545 10/03/2024 PRINTED 000985 DUDEK 3,836.25 175546 10/03/2024 PRINTED 001105 EAGLE PORTABLES INC 868.59 175547 10/03/2024 PRINTED 001205 ELITE SPECIAL EVENTS 5,190.00 175548 10/03/2024 PRINTED 007745 EVENT AND PARTY SUPPLIES 1,092.00 175549 10/03/2024 PRINTED 000039 EWING IRRIGATION PRODUCTS 5,201.02 175550 10/03/2024 PRINTED 004223 YOLANDA FIELDER 50.00 175551 10/03/2024 PRINTED 002192 LEANDREA FIELDS-ROBINSON 50.00 175552 10/03/2024 PRINTED 004019 FLEETCREW MAINTENANCE SOL 575.00 175553 10/03/2024 PRINTED 001849 CAROLYN FOSTER 50.00 175554 10/03/2024 PRINTED 008282 FREEDOM INDUSTRIES DOORS 482.99 City of Carson
AP CHECK RECONCILIATION REGISTER
Report generated: 10/24/2024 17:28
User: bbrown
Program ID: apchkrcn
FOR CASH ACCOUNT: 100-99-999-999-1010- FOR: All Except Stale CHECK # CHECK DATE TYPE VENDOR NAME UNCLEARED CLEARED BATCH CLEAR DATE 175555 10/03/2024 PRINTED 003563 FUN EXPRESS LLC 525.89 175556 10/03/2024 PRINTED 008312 GANAHL LUMBER COMPANY 280.48 175557 10/03/2024 PRINTED 008052 GET TOOLS CORP 3,043.91 175558 10/03/2024 PRINTED 008335 GOMEZ GROWERS INC. 292.16 175559 10/03/2024 PRINTED 002354 FREDDIE GOMEZ 50.00 175560 10/03/2024 PRINTED 000793 GRAINGER 494.26 175561 10/03/2024 PRINTED 008132 HASA INC 383.16 175562 10/03/2024 PRINTED 004308 DONALD HAYES 3,500.00 175563 10/03/2024 PRINTED 007678 HEIDI LETICIA ROMERO 50.00 175564 10/03/2024 PRINTED 000234 THE HOME DEPOT INC 1,918.29 175565 10/03/2024 PRINTED 000615 DELL HUFF 100.00 175566 10/03/2024 PRINTED 008284 ILLUMA ELECTRIC DESIGN LL 6,268.00 175567 10/03/2024 PRINTED 006410 INNOVATIVE STAMPING CORP. 2,077.11 175568 10/03/2024 PRINTED 007162 JAIME G. MONTECLARO 100.00 175569 10/03/2024 PRINTED 006715 JAZZ IN PINK 3,500.00 175570 10/03/2024 PRINTED 007588 JEFFREY GLENN ALLEN 50.00 175571 10/03/2024 PRINTED 007688 JOKER PARTY SUPPLY, INC. 580.48 175572 10/03/2024 PRINTED 008148 KEICHUN LERAINE GRAVES 50.00 175573 10/03/2024 PRINTED 007596 KEITH EDWARD ARNOLD 50.00 175574 10/03/2024 PRINTED 007093 KILEY & ASSOCIATES LLC 5,000.00 175575 10/03/2024 PRINTED 006525 KOA CORPORATION 14,545.81 175576 10/03/2024 PRINTED 004593 FE P KOONS 50.00 175577 10/03/2024 PRINTED 004428 LAWSON PRODUCTS INC 23.55 175578 10/03/2024 PRINTED 007280 LETICIA VASQUEZ WILSON 100.00 175579 10/03/2024 PRINTED 006731 LIFESTATION INC 774.03 175580 10/03/2024 PRINTED 003481 LL WATERFALL DESIGN 320.00 175581 10/03/2024 PRINTED 000243 LOS ANGELES BUSINESS JOUR 1,200.00 175582 10/03/2024 PRINTED 007248 MARIA'S GARDEN CENTER & L 88.20 175583 10/03/2024 PRINTED 006831 MARSH USA INC. 8,873.48 175584 10/03/2024 PRINTED 008191 MATTHEWS FAMILY COUNSELIN 1,000.00 175585 10/03/2024 PRINTED 006271 MAYFLOWER DISTRIBUTING CO 265.25 175586 10/03/2024 PRINTED 000037 MAYFLOWER DISTRIBUTING CO 147.54 175587 10/03/2024 PRINTED 000669 MDG ASSOCIATES 458.00 175588 10/03/2024 PRINTED 003110 MICHAEL BAKER INTERNATION 2,385.00 175589 10/03/2024 PRINTED 007605 MICHAEL K WILSON 50.00 175590 10/03/2024 PRINTED 006214 NBS GOVERNMENT FINANCE GR 1,000.00 175591 10/03/2024 PRINTED 000563 JANNY NOA 108.14 175592 10/03/2024 VOID 008409 NORMAN BROWN .00 175593 10/03/2024 PRINTED 010999 KENT TRAN 275.24 175594 10/03/2024 PRINTED 000528 PARTY PRONTO 3,224.00 175595 10/03/2024 PRINTED 003099 PAMELA PITCHER 50.00 175596 10/03/2024 PRINTED 001149 DENICE PRICE 50.00 175597 10/03/2024 PRINTED 001126 GRETA PRICE 50.00 175598 10/03/2024 PRINTED 000119 RED WING SHOE STORE 7,183.36 175599 10/03/2024 PRINTED 003304 REQUEST LINE MUSIC 700.00 175600 10/03/2024 PRINTED 010000 3V SIGNS & GRAPHICS 200.00 175601 10/03/2024 PRINTED 010000 NATIONAL CONGRESS OF BLAC 500.00 175602 10/03/2024 PRINTED 005541 GAVIN RHONE 7,000.00 175603 10/03/2024 PRINTED 008216 ROBERT HALF INC. 2,880.00 175604 10/03/2024 PRINTED 000120 S AND S WORLDWIDE INC 1,107.85 175605 10/03/2024 PRINTED 007957 SAMUEL DACUS 50.00 175606 10/03/2024 PRINTED 000444 MIGDALIA SANCHEZ 235.37 City of Carson
AP CHECK RECONCILIATION REGISTER
Report generated: 10/24/2024 17:28
User: bbrown
Program ID: apchkrcn
FOR CASH ACCOUNT: 100-99-999-999-1010- FOR: All Except Stale CHECK # CHECK DATE TYPE VENDOR NAME UNCLEARED CLEARED BATCH CLEAR DATE 175607 10/03/2024 PRINTED 000124 SEPULVEDA BUILDING MATERI 825.64 175608 10/03/2024 PRINTED 003159 SITEONE LANDSCAPE SUPPLY 4,047.79 175609 10/03/2024 PRINTED 000211 SMART AND FINAL IRIS 175.36 175610 10/03/2024 PRINTED 004417 SOCALGAS 6,757.03 175611 10/03/2024 PRINTED 007812 SONYA EATMAN 50.00 175612 10/03/2024 PRINTED 006384 CHARTER COMMUNICATIONS 13,188.64 175613 10/03/2024 PRINTED 003100 LINDA STEWART 50.00 175614 10/03/2024 PRINTED 007090 T-MOBILE USA INC. 3,064.72 175615 10/03/2024 PRINTED 007897 THE SEGAL COMPANY (WESTER 124,725.00 175616 10/03/2024 PRINTED 007612 THEODORE I. BENITO 7,875.00 175617 10/03/2024 PRINTED 008356 PACIFIC WOOD AND IRON, LL 3,000.00 175618 10/03/2024 PRINTED 001758 SHEILA TRESVANT 50.00 175619 10/03/2024 PRINTED 007726 UC ADVANTAGE, INC. 643.75 175620 10/03/2024 PRINTED 006404 UNIFIRST CORPORATION 93.84 175621 10/03/2024 PRINTED 000562 THE WALKING MAN INC 1,750.00 175622 10/03/2024 PRINTED 001507 XTREME FITNESS 165.00 175623 10/08/2024 PRINTED 008409 NORMAN BROWN 5,000.00 175624 10/08/2024 PRINTED 007777 National Corrosion 11,162.00 175625 10/10/2024 PRINTED 000797 ALESHIRE AND WYNDER LLP 25,587.90 175626 10/10/2024 PRINTED 000042 ALIN PARTY SUPPLY CO 195.95 175627 10/10/2024 PRINTED 006506 ALL IN ONE PARTIES 685.00 175628 10/10/2024 PRINTED 005523 AMAZON CAPITAL SERVICES 3,157.55 175629 10/10/2024 PRINTED 000495 AMERICAN SOCCER CO INC 592.09 175630 10/10/2024 PRINTED 007318 ARDYANNA DUCUSIN 200.00 175631 10/10/2024 PRINTED 002177 ARIZONA MACHINERY LLC 637.77 175632 10/10/2024 PRINTED 008208 AUDACY OPERATIONS, INC. 5,850.00 175633 10/10/2024 PRINTED 004410 B D WHITE TOP SOIL CO INC 429.98 175634 10/10/2024 PRINTED 007353 BEADOR CONSTRUCTION COMPA 63,268.86 175635 10/10/2024 PRINTED 003126 BLOOMING FLOWERS 4,955.00 175636 10/10/2024 PRINTED 006293 RUDOLFO BRILLANTES 50.00 175637 10/10/2024 PRINTED 001713 KELVIN BROWN SR 50.00 175638 10/10/2024 PRINTED 001031 JESUS-ALEX CAINGLET 50.00 175639 10/10/2024 PRINTED 000405 CALPERS 14,574.64 175640 10/10/2024 PRINTED 000351 CHEM PRO LABORATORY INC 638.40 175641 10/10/2024 PRINTED 008179 CHENG-WEI PONG 3,300.00 175642 10/10/2024 PRINTED 001610 CHICAGO TITLE CO 712.00 175643 10/10/2024 PRINTED 001489 CHOURA VENUE SERVICES 1,413.05 175644 10/10/2024 PRINTED 001489 CHOURA VENUE SERVICES 653.27 175645 10/10/2024 PRINTED 000114 CITY OF CARSON PETTY CASH 108.74 175646 10/10/2024 PRINTED 007718 CLIVABETH PHOTOGRAPHY LLC 3,330.00 175647 10/10/2024 PRINTED 007159 CORODATA RECORDS MANAGEME 603.95 175648 10/10/2024 PRINTED 001629 CORTEZ GRAPHICS 606.38 175649 10/10/2024 PRINTED 001180 COUNTY OF LOS ANGELES 16,081.11 175650 10/10/2024 PRINTED 008147 CYNTHIA STAFFORD 1,500.00 175651 10/10/2024 PRINTED 006467 CESAR DAHILIG 50.00 175652 10/10/2024 PRINTED 000358 DELL COMPUTER CORP 6,150.71 175653 10/10/2024 PRINTED 006876 DONS AUDIO VISUAL 458.50 175654 10/10/2024 PRINTED 001105 EAGLE PORTABLES SANITATIO 2,144.03 175655 10/10/2024 PRINTED 007456 EDWINA S. HUNTER 50.00 175656 10/10/2024 PRINTED 008054 EJ USA, INC 1,476.64 175657 10/10/2024 PRINTED 000039 EWING IRRIGATION PRODUCTS 179.89 175658 10/10/2024 PRINTED 000159 RAYMOND M. ALDRIGE, JR. 8,593.99 City of Carson
AP CHECK RECONCILIATION REGISTER
Report generated: 10/24/2024 17:28
User: bbrown
Program ID: apchkrcn
FOR CASH ACCOUNT: 100-99-999-999-1010- FOR: All Except Stale CHECK # CHECK DATE TYPE VENDOR NAME UNCLEARED CLEARED BATCH CLEAR DATE 175659 10/10/2024 PRINTED 007224 FCS INTERNATIONAL, INC. 52,815.40 175660 10/10/2024 PRINTED 000355 FERGUSON ENTERPRISES INC 29.70 175661 10/10/2024 PRINTED 000221 FLEET PRIDE 9.31 175662 10/10/2024 PRINTED 004019 FLEETCREW MAINTENANCE SOL 953.00 175663 10/10/2024 PRINTED 008312 GANAHL LUMBER COMPANY 3,307.84 175664 10/10/2024 PRINTED 007266 GHD INC 186,284.75 175665 10/10/2024 PRINTED 000941 GOLDEN STATE WATER COMPAN 1,349.99 175666 10/10/2024 PRINTED 001293 WALTER GONZALEZ 50.00 175667 10/10/2024 PRINTED 008352 GRAFFITI PROTECTIVE COATI 4,329.92 175668 10/10/2024 PRINTED 007128 GUITAR CENTER STORES, INC 4,818.99 175669 10/10/2024 PRINTED 006981 HANGTIME SPORTS 560.00 175670 10/10/2024 PRINTED 008132 HASA INC 1,149.49 175671 10/10/2024 PRINTED 000532 HDL COREN AND CONE 4,460.00 175672 10/10/2024 PRINTED 000242 HINDERLITER DE LLAMAS AND 3,635.53 175673 10/10/2024 PRINTED 000248 HOBART CORP 4,528.00 175674 10/10/2024 PRINTED 000234 THE HOME DEPOT INC 15,329.51 175675 10/10/2024 PRINTED 008160 HZS ENGINEERING INC 148,494.96 175676 10/10/2024 PRINTED 007655 IDS GROUP, INC 13,439.75 175677 10/10/2024 PRINTED 004935 JACQUELINE JOHNSON 50.00 175678 10/10/2024 PRINTED 007688 JOKER PARTY SUPPLY, INC. 156.57 175679 10/10/2024 PRINTED 001775 KAYUMANGGI LIONS CLUB 330.00 175680 10/10/2024 PRINTED 007672 KELLY PAPER COMPANY 1,137.28 175681 10/10/2024 PRINTED 000663 LANGUAGE NETWORK 1,669.89 175682 10/10/2024 PRINTED 004428 LAWSON PRODUCTS INC 151.58 175683 10/10/2024 PRINTED 008197 LIFTECH ELEVATOR SERVICES 957.00 175684 10/10/2024 PRINTED 006668 LOS ANGELES CONSERVATION 73,341.40 175685 10/10/2024 PRINTED 000070 LOS ANGELES COUNTY DEPT O 160,441.14 175686 10/10/2024 PRINTED 000070 LOS ANGELES COUNTY DEPT O 138,880.80 175687 10/10/2024 PRINTED 000074 LOS ANGELES COUNTY SHERIF 153,770.34 175688 10/10/2024 PRINTED 006884 LYFT, INC. 7,780.32 175689 10/10/2024 PRINTED 007248 MARIA'S GARDEN CENTER & L 4,041.77 175690 10/10/2024 PRINTED 007973 MARIPOSA LANDSCAPES, INC 24,036.00 175691 10/10/2024 PRINTED 000669 MDG ASSOCIATES 15,902.50 175692 10/10/2024 PRINTED 002703 MIXONE SOUND LLC 9,000.00 175693 10/10/2024 PRINTED 007664 WILLIAMS SCOTSMAN, INC. 309.36 175694 10/10/2024 PRINTED 007310 VIGILANT SOLUTIONS, LLC 216,615.24 175695 10/10/2024 PRINTED 007851 NAVIN SAMI 10,495.00 175696 10/10/2024 PRINTED 000563 JANNY NOA 48.58 175697 10/10/2024 PRINTED 010999 DEBBIE MIDDENWAY 327.56 175698 10/10/2024 PRINTED 000649 PEPE'S INC 481.25 175699 10/10/2024 PRINTED 001020 PITNEY BOWES 633.52 175700 10/10/2024 PRINTED 008084 R&S OVERHEAD DOORS OF SOU 1,079.01 175701 10/10/2024 PRINTED 008246 RA LUCAS COMPANY INC 273.13 175702 10/10/2024 PRINTED 006973 RACE TELECOMMUNICATIONS, 2,154.44 175703 10/10/2024 PRINTED 008412 REBECCA H OSBORNE 25,000.00 175704 10/10/2024 PRINTED 000588 REFRIGERATION SUPPLIES DI 1,497.89 175705 10/10/2024 PRINTED 003304 REQUEST LINE MUSIC 1,000.00 175706 10/10/2024 PRINTED 010000 JOVITA WOOD 250.00 175707 10/10/2024 PRINTED 010000 NATIONAL CONGRESS OF BLAC 242.60 175708 10/10/2024 PRINTED 010000 TANISHA ANDERSON 250.00 175709 10/10/2024 PRINTED 010000 THE SEGAL CO WESTERN STAT 1,350.00 175710 10/10/2024 PRINTED 000402 ROADLINE PRODUCTS INC USA 8,250.40 City of Carson
AP CHECK RECONCILIATION REGISTER
Report generated: 10/24/2024 17:28
User: bbrown
Program ID: apchkrcn
FOR CASH ACCOUNT: 100-99-999-999-1010- FOR: All Except Stale CHECK # CHECK DATE TYPE VENDOR NAME UNCLEARED CLEARED BATCH CLEAR DATE 175711 10/10/2024 PRINTED 001230 ROBERTSONS READY MIX CONC 1,138.77 175712 10/10/2024 PRINTED 003585 RSG INC 4,934.36 175713 10/10/2024 PRINTED 000427 SAM'S CLUB DIRECT 1,326.21 175714 10/10/2024 PRINTED 001605 SC FUELS 55,525.49 175715 10/10/2024 PRINTED 006964 SCCI, INC. 300.00 175716 10/10/2024 PRINTED 000124 SEPULVEDA BUILDING MATERI 285.79 175717 10/10/2024 PRINTED 003159 SITEONE LANDSCAPE SUPPLY 88.97 175718 10/10/2024 PRINTED 000211 SMART AND FINAL IRIS 375.76 175719 10/10/2024 PRINTED 001413 SMART SOURCE OF CALIFORNI 3,039.13 175720 10/10/2024 PRINTED 000240 SOUTHERN CALIFORNIA EDISO 132,324.25 175721 10/10/2024 PRINTED 000538 SOUTH BAY CITIES COUNCIL 236,327.00 175722 10/10/2024 PRINTED 000718 STAPLES ADVANTAGE 33,381.15 175723 10/10/2024 PRINTED 006654 SWANK MOTION PICTURES INC 1,025.00 175724 10/10/2024 PRINTED 007826 TETRA GRAPHICS, INC 1,958.63 175725 10/10/2024 PRINTED 007612 THEODORE I. BENITO 7,875.00 175726 10/10/2024 PRINTED 007612 THEODORE I. BENITO 6,466.29 175727 10/10/2024 PRINTED 008106 TOTUM CORP 1,267.50 175728 10/10/2024 PRINTED 004017 TYLER TECHNOLOGIES 133,617.00 175729 10/10/2024 PRINTED 006769 U S BANK CORPORATE PAYMEN 7,768.37 175730 10/10/2024 PRINTED 006404 UNIFIRST CORPORATION 1,269.54 175731 10/10/2024 PRINTED 001249 VERIZON WIRELESS 350.58 175732 10/10/2024 PRINTED 005511 VULCAN MATERIALS CO. 3,700.40 175733 10/10/2024 PRINTED 006220 WASTE RESOURCES, INC 625,331.05 175734 10/10/2024 PRINTED 000302 WAXIE SANITARY SUPPLY 280.64 175735 10/10/2024 PRINTED 008256 WESTERN A/V 110,342.98 175736 10/10/2024 PRINTED 002212 HD SUPPLY CONSTRUCTION 2,427.35 175737 10/10/2024 PRINTED 000144 YAMADA CO INC 1,333.64 175738 10/10/2024 PRINTED 000544 ZEP MANUFACTURING CO 293.21 175739 10/16/2024 PRINTED 007777 Frederick Robert Alvarez 4,320.00 175740 10/16/2024 PRINTED 007777 Most Valuable Plumber 13,388.00 175741 10/16/2024 PRINTED 007777 Resource Environmental LL 16,758.00 175742 10/17/2024 PRINTED 000801 ABILITY FIRST 1,000.00 175743 10/17/2024 PRINTED 000137 ADMINISTRATIVE SERVICES C 26,455.38 175744 10/17/2024 PRINTED 000042 ALIN PARTY SUPPLY CO 1,798.88 175745 10/17/2024 PRINTED 007409 ALISON WHITNEY MILLER 195.75 175746 10/17/2024 PRINTED 004388 AIS TRUST ACCOUNT NEWPORT 384.00 175747 10/17/2024 PRINTED 005523 AMAZON CAPITAL SERVICES 3,520.41 175748 10/17/2024 PRINTED 000495 AMERICAN SOCCER CO INC 446.13 175749 10/17/2024 PRINTED 000543 AQUA FLO SUPPLY 1,777.17 175750 10/17/2024 PRINTED 000974 AT & T ALARM CIRCUITS 841.61 175751 10/17/2024 PRINTED 007043 AUTOLIFT SERVICES INC 925.00 175752 10/17/2024 PRINTED 004410 B D WHITE TOP SOIL CO INC 1,323.00 175753 10/17/2024 PRINTED 007051 BASIC BENEFITS LLC 1,362.42 175754 10/17/2024 PRINTED 000697 BIG ANDYS TROPHIES AND PL 3,358.21 175755 10/17/2024 PRINTED 003126 BLOOMING FLOWERS 320.00 175756 10/17/2024 PRINTED 001438 BLUE DIAMOND MATERIALS 1,854.07 175757 10/17/2024 PRINTED 007365 BLUETRITON BRANDS, INC. 4,799.95 175758 10/17/2024 PRINTED 008406 BRANDT MARTINEZ 1,265.31 175759 10/17/2024 PRINTED 007656 BREEN DESIGN GROUP, INC 15,662.50 175760 10/17/2024 PRINTED 006076 BRI CONSULTING GROUP, INC 4,715.00 175761 10/17/2024 PRINTED 001627 BSN SPORTS LLC 424.90 175762 10/17/2024 PRINTED 006455 AALON BUTLER 800.00 City of Carson
AP CHECK RECONCILIATION REGISTER
Report generated: 10/24/2024 17:28
User: bbrown
Program ID: apchkrcn
FOR CASH ACCOUNT: 100-99-999-999-1010- FOR: All Except Stale CHECK # CHECK DATE TYPE VENDOR NAME UNCLEARED CLEARED BATCH CLEAR DATE 175763 10/17/2024 PRINTED 007225 CAJA ENVIRONMENTAL SERVIC 26,985.00 175764 10/17/2024 PRINTED 007161 CARLOS ALBERTO GUERRA 100.00 175765 10/17/2024 PRINTED 008141 CARTER PICTURE FRAMING & 257.14 175766 10/17/2024 PRINTED 001489 CHOURA VENUE SERVICES 9,595.82 175767 10/17/2024 PRINTED 004168 CIGNA BEHAVIORAL HEALTH I 681.45 175768 10/17/2024 PRINTED 008204 CJ CONCRETE CONSTRUCTION, 356,190.00 175769 10/17/2024 PRINTED 008033 CLARENCE JOHNSON 100.00 175770 10/17/2024 PRINTED 008082 CLIMATEC LLC 3,516.00 175771 10/17/2024 PRINTED 007718 CLIVABETH PHOTOGRAPHY LLC 270.11 175772 10/17/2024 PRINTED 008325 COLOR CARD ADMINISTRATOR, 104.86 175773 10/17/2024 PRINTED 008405 CORODATA SHREDDING INC. 59.00 175774 10/17/2024 PRINTED 001180 COUNTY OF LOS ANGELES 798.12 175775 10/17/2024 PRINTED 004115 CSG CONSULTANTS INC 17,981.25 175776 10/17/2024 PRINTED 007163 DIANNE THOMAS 100.00 175777 10/17/2024 PRINTED 006465 LOUIE DIAZ 100.00 175778 10/17/2024 PRINTED 006482 FREDERICK DOCDOCIL 100.00 175779 10/17/2024 PRINTED 006876 DONS AUDIO VISUAL 4,264.50 175780 10/17/2024 PRINTED 008189 ED'S FENCING, INC 13,690.00 175781 10/17/2024 PRINTED 008383 ERWIN VASQUEZ 250.00 175782 10/17/2024 PRINTED 000039 EWING IRRIGATION PRODUCTS 563.36 175783 10/17/2024 PRINTED 000159 RAYMOND M. ALDRIGE, JR. 404.62 175784 10/17/2024 PRINTED 000355 FERGUSON ENTERPRISES INC 2,062.68 175785 10/17/2024 PRINTED 003563 FUN EXPRESS LLC 462.75 175786 10/17/2024 PRINTED 004437 GALLS LLC 187.24 175787 10/17/2024 PRINTED 000941 GOLDEN STATE WATER COMPAN 56.35 175788 10/17/2024 PRINTED 000865 GOODWILL LONG BEACH AND S 8,150.00 175789 10/17/2024 PRINTED 005525 GREENBERG TRAURIG LLP 9,406.50 175790 10/17/2024 PRINTED 006981 HANGTIME SPORTS 640.00 175791 10/17/2024 PRINTED 000234 THE HOME DEPOT INC 1,994.76 175792 10/17/2024 PRINTED 000615 DELL HUFF 100.00 175793 10/17/2024 PRINTED 007655 IDS GROUP, INC 9,082.50 175794 10/17/2024 PRINTED 007469 JENN SALES CORPORATION 6,550.51 175795 10/17/2024 PRINTED 000152 JERRYS CLEANERS 210.50 175796 10/17/2024 PRINTED 006528 JOHN CRUIKSHANK CONSULTAN 4,029.06 175797 10/17/2024 PRINTED 007688 JOKER PARTY SUPPLY, INC. 1,694.90 175798 10/17/2024 PRINTED 007672 KELLY PAPER COMPANY 180.21 175799 10/17/2024 PRINTED 006724 9KOLE IMPORTS 5,268.91 175800 10/17/2024 PRINTED 004428 LAWSON PRODUCTS INC 2,059.64 175801 10/17/2024 PRINTED 007280 LETICIA VASQUEZ WILSON 100.00 175802 10/17/2024 PRINTED 004284 LIFE INSURANCE COMPANY OF 94,643.10 175803 10/17/2024 PRINTED 000243 LOS ANGELES BUSINESS JOUR 3,500.00 175804 10/17/2024 PRINTED 000072 LOS ANGELES COUNTY REGIST 75.00 175805 10/17/2024 PRINTED 000072 BUSINESS FILINGS AND REGI 75.00 175806 10/17/2024 PRINTED 007248 MARIA'S GARDEN CENTER & L 7,242.98 175807 10/17/2024 PRINTED 007428 MFUME, DEQUITA 100.00 175808 10/17/2024 PRINTED 007453 NEICE KNIGHT 100.00 175809 10/17/2024 PRINTED 008099 NGOZICHUKWU MORDI 2,975.00 175810 10/17/2024 PRINTED 007736 NIKKI SHORTS 1,400.00 175811 10/17/2024 PRINTED 001285 POWER WHOLESALE ELECTRIC 2,547.28 175812 10/17/2024 PRINTED 004862 PRINCIPAL LIFE INSURANCE 4,673.90 175813 10/17/2024 PRINTED 007372 PROTIME SPORTS INC 3,548.39 175814 10/17/2024 PRINTED 003829 REGIONAL TAP SERVICE CENT 52.52 City of Carson
AP CHECK RECONCILIATION REGISTER
Report generated: 10/24/2024 17:28
User: bbrown
Program ID: apchkrcn
FOR CASH ACCOUNT: 100-99-999-999-1010- FOR: All Except Stale CHECK # CHECK DATE TYPE VENDOR NAME UNCLEARED CLEARED BATCH CLEAR DATE 175815 10/17/2024 PRINTED 003304 REQUEST LINE MUSIC 700.00 175816 10/17/2024 PRINTED 010000 ANGIE MORANTE 250.00 175817 10/17/2024 PRINTED 010000 FREEDOM FOREVER LLC 368.45 175818 10/17/2024 PRINTED 010000 RAFI PAGUS 368.45 175819 10/17/2024 PRINTED 010000 SHERRY TERESA TURPIN 200.00 175820 10/17/2024 PRINTED 010000 SOLEX CONTRACTING INC 569.71 175821 10/17/2024 PRINTED 010000 TAOSO MOLLY MAIKO 250.00 175822 10/17/2024 PRINTED 000402 ROADLINE PRODUCTS INC USA 503.56 175823 10/17/2024 PRINTED 008216 ROBERT HALF INC. 3,420.00 175824 10/17/2024 PRINTED 001230 ROBERTSONS READY MIX LTD 936.00 175825 10/17/2024 PRINTED 001388 RUSSELL SIGLER INC 415.22 175826 10/17/2024 PRINTED 000120 S AND S WORLDWIDE INC 193.04 175827 10/17/2024 PRINTED 000427 SAM'S CLUB DIRECT 222.40 175828 10/17/2024 PRINTED 000124 SEPULVEDA BUILDING MATERI 302.64 175829 10/17/2024 PRINTED 003159 SITEONE LANDSCAPE SUPPLY 492.01 175830 10/17/2024 PRINTED 007052 SL CARSON BUILDERS, LLC 113,879.00 175831 10/17/2024 PRINTED 008027 SMARTSHEET INC. 4,500.00 175832 10/17/2024 PRINTED 004417 SOCALGAS 5.11 175833 10/17/2024 PRINTED 004977 CHARTER COMMUNICATION 1,479.00 175834 10/17/2024 PRINTED 001843 STATE OF CALIFORNIA 684.10 175835 10/17/2024 PRINTED 005013 SWAYZER CORPORATION 34,279.39 175836 10/17/2024 PRINTED 008180 TOBIAS LEVI MOODY 600.00 175837 10/17/2024 PRINTED 004017 TYLER TECHNOLOGIES 17,860.00 175838 10/17/2024 PRINTED 006769 U S BANK CORPORATE PAYMEN 10,492.04 175839 10/17/2024 PRINTED 006404 UNIFIRST CORPORATION 675.31 175840 10/17/2024 PRINTED 004186 THE UPS STORE 6721 716.64 175841 10/17/2024 PRINTED 008424 VICTORIA SMITH 25,000.00 175842 10/17/2024 PRINTED 008256 WESTERN A/V 87,496.84 175843 10/24/2024 PRINTED 004020 ABTECH TECHNOLOGIES INC 3,390.80 175844 10/24/2024 PRINTED 002904 ADMINSURE INC 9,363.00 175845 10/24/2024 PRINTED 007077 ADVANCED IMAGING STRATEGI 652.50 175846 10/24/2024 PRINTED 008190 ALFARO COMMUNICATIONS CON 217,467.82 175847 10/24/2024 PRINTED 000042 ALIN PARTY SUPPLY CO 534.91 175848 10/24/2024 PRINTED 007409 ALISON WHITNEY MILLER 13,767.75 175849 10/24/2024 PRINTED 004388 AIS TRUST ACCOUNT NEWPORT 2,770.78 175850 10/24/2024 PRINTED 005523 AMAZON CAPITAL SERVICES 4,495.48 175851 10/24/2024 PRINTED 008395 ANDREA VILLASANA 50.00 175852 10/24/2024 PRINTED 000543 AQUA FLO SUPPLY 565.80 175853 10/24/2024 PRINTED 000974 AT & T ALARM CIRCUITS 95.96 175854 10/24/2024 PRINTED 001001 AT&T PHONE 2,021.66 175855 10/24/2024 PRINTED 003104 AUDIOTECH PRODUCTION 1,500.00 175856 10/24/2024 PRINTED 004410 B D WHITE TOP SOIL CO INC 251.37 175857 10/24/2024 PRINTED 004641 BILLYE BATES 50.00 175858 10/24/2024 PRINTED 003242 BLACK KNIGHT PATROL, INC 1,260.00 175859 10/24/2024 PRINTED 000348 BLUEPRINT SERVICE 1,006.14 175860 10/24/2024 PRINTED 000140 CARL WARREN AND CO 10,491.00 175861 10/24/2024 PRINTED 000351 CHEM PRO LABORATORY INC 12,256.49 175862 10/24/2024 PRINTED 007718 CLIVABETH PHOTOGRAPHY LLC 7,276.50 175863 10/24/2024 PRINTED 007718 CLIVABETH PHOTOGRAPHY LLC 1,622.50 175864 10/24/2024 PRINTED 007718 CLIVABETH PHOTOGRAPHY LLC 885.00 175865 10/24/2024 PRINTED 008325 COLOR CARD ADMINISTRATOR, 57.94 175866 10/24/2024 PRINTED 001381 COMPLETE OFFICE 1,471.84 City of Carson
AP CHECK RECONCILIATION REGISTER
Report generated: 10/24/2024 17:28
User: bbrown
Program ID: apchkrcn
FOR CASH ACCOUNT: 100-99-999-999-1010- FOR: All Except Stale CHECK # CHECK DATE TYPE VENDOR NAME UNCLEARED CLEARED BATCH CLEAR DATE 175867 10/24/2024 PRINTED 001180 COUNTY OF LOS ANGELES 2,179.86 175868 10/24/2024 PRINTED 004895 COUNTY SANITATION DISTRIC 31,500.00 175869 10/24/2024 PRINTED 000268 DAILY JOURNAL CORP 384.40 175870 10/24/2024 PRINTED 000534 DIRECTV 267.99 175871 10/24/2024 PRINTED 006876 DONS AUDIO VISUAL 6,437.00 175872 10/24/2024 PRINTED 001105 EAGLE PORTABLES SANITATIO 4,236.90 175873 10/24/2024 PRINTED 007512 EDDINGS ENTERPRISES, INC. 673.34 175874 10/24/2024 PRINTED 003667 ERNESTINE LEVERETTE 50.00 175875 10/24/2024 PRINTED 000039 EWING IRRIGATION PRODUCTS 5,399.62 175876 10/24/2024 PRINTED 000355 FERGUSON ENTERPRISES INC 273.47 175877 10/24/2024 PRINTED 008312 GANAHL LUMBER COMPANY 27.78 175878 10/24/2024 PRINTED 006085 GARCIA, MARIA DE JESUS 61.46 175879 10/24/2024 PRINTED 001268 GBROS INC 506.15 175880 10/24/2024 PRINTED 000941 GOLDEN STATE WATER COMPAN 23,325.74 175881 10/24/2024 PRINTED 008335 GOMEZ GROWERS INC. 140.02 175882 10/24/2024 PRINTED 001093 SHIRLEY GRAVES 50.00 175883 10/24/2024 PRINTED 008394 HANNAH MITCHELL 50.00 175884 10/24/2024 PRINTED 007378 HERC RENTALS INC. 3,445.22 175885 10/24/2024 PRINTED 000234 THE HOME DEPOT INC 663.75 175886 10/24/2024 PRINTED 001210 HYGRADE PLANTING MIX 138.00 175887 10/24/2024 PRINTED 000152 JERRYS CLEANERS 545.00 175888 10/24/2024 PRINTED 008390 JOSHUA MOORE 50.00 175889 10/24/2024 PRINTED 008397 KHRISTOPHER REDWAY 50.00 175890 10/24/2024 PRINTED 000094 LAKESHORE LEARNING MATERI 269.89 175891 10/24/2024 PRINTED 008272 LARHONDA BROWN 50.00 175892 10/24/2024 PRINTED 004428 LAWSON PRODUCTS INC 1,214.38 175893 10/24/2024 PRINTED 008391 LEWIS COLSON 50.00 175894 10/24/2024 PRINTED 007569 LINDA R. DUNN 50.00 175895 10/24/2024 PRINTED 008396 LIV WILLIAMS 50.00 175896 10/24/2024 PRINTED 004767 DELIA LOPEZ 50.00 175897 10/24/2024 PRINTED 000243 LOS ANGELES BUSINESS JOUR 3,500.00 175898 10/24/2024 PRINTED 006668 LOS ANGELES CONSERVATION 33,337.00 175899 10/24/2024 PRINTED 000074 LOS ANGELES COUNTY SHERIF 2,099,702.71 175900 10/24/2024 PRINTED 000494 M AND S METALS 15,746.12 175901 10/24/2024 PRINTED 007248 MARIA'S GARDEN CENTER & L 1,064.57 175902 10/24/2024 PRINTED 000037 MAYFLOWER DISTRIBUTING CO 193.68 175903 10/24/2024 PRINTED 000173 MMASC 125.00 175904 10/24/2024 PRINTED 000379 MUTUAL PROPANE CO INC 182.66 175905 10/24/2024 PRINTED 008437 MYESHIA HORTON 27.55 175906 10/24/2024 PRINTED 006214 NBS GOVERNMENT FINANCE GR 2,206.88 175907 10/24/2024 PRINTED 004292 NEWEGG BUSINESS INC 315.60 175908 10/24/2024 PRINTED 008358 NTH GENERATION COMPUTING, 20,670.00 175909 10/24/2024 PRINTED 000481 OCEAN BLUE ENVIRONMENTAL 4,282.48 175910 10/24/2024 PRINTED 010999 JESSICA OLIVIA VILLACIS 215.43 175911 10/24/2024 PRINTED 002445 PATRICIA PATTERSON 50.00 175912 10/24/2024 PRINTED 000649 PEPE'S INC 385.00 175913 10/24/2024 PRINTED 000460 PETES ROAD SERVICE INC 3,102.06 175914 10/24/2024 PRINTED 000118 JULIE RUIZ RABER 50.00 175915 10/24/2024 PRINTED 000588 REFRIGERATION SUPPLIES DI 1,134.60 175916 10/24/2024 PRINTED 010000 AFC CONSULTING LLC 860.00 175917 10/24/2024 PRINTED 010000 BELINDA HAYES 500.00 175918 10/24/2024 PRINTED 010000 CHARTER COMMUNICATIONS 360.00 City of Carson
AP CHECK RECONCILIATION REGISTER
Report generated: 10/24/2024 17:28
User: bbrown
Program ID: apchkrcn
FOR CASH ACCOUNT: 100-99-999-999-1010- FOR: All Except Stale CHECK # CHECK DATE TYPE VENDOR NAME UNCLEARED CLEARED BATCH CLEAR DATE 175919 10/24/2024 PRINTED 010000 FRANCISCO GONZALEZ 500.00 175920 10/24/2024 PRINTED 010000 JONATHAN CAMERON 360.00 175921 10/24/2024 PRINTED 010000 KHOON STEPHANIE 480.00 175922 10/24/2024 PRINTED 010000 LCE TELECOM INC 360.00 175923 10/24/2024 PRINTED 010000 MISCHALAY LATRICE 250.00 175924 10/24/2024 PRINTED 010000 MOST VALUABLE PLUMBER 1,080.00 175925 10/24/2024 PRINTED 010000 RENEE GRANT 500.00 175926 10/24/2024 PRINTED 000402 ROADLINE PRODUCTS CO 16,254.58 175927 10/24/2024 PRINTED 000402 ROADLINE PRODUCTS INC USA 13,225.78 175928 10/24/2024 PRINTED 001230 ROBERTSONS READY MIX LTD 1,694.78 175929 10/24/2024 PRINTED 002515 MYRNA RONQUILLO 50.00 175930 10/24/2024 PRINTED 001388 RUSSELL SIGLER INC 37.53 175931 10/24/2024 PRINTED 000427 SAM'S CLUB DIRECT 1,386.21 175932 10/24/2024 PRINTED 001605 SC FUELS 11,586.84 175933 10/24/2024 PRINTED 004226 DARLENE SIMPSON-LOTT 50.00 175934 10/24/2024 PRINTED 000191 SMARDAN SUPPLY 322.39 175935 10/24/2024 PRINTED 000211 SMART AND FINAL IRIS 707.62 175936 10/24/2024 PRINTED 000240 SOUTHERN CALIFORNIA EDISO 59,131.24 175937 10/24/2024 PRINTED 008152 SO CAL EQUIPMENT REPAIR, 1,124.32 175938 10/24/2024 PRINTED 007582 SO CAL SANITATION, LLC 9,244.46 175939 10/24/2024 PRINTED 001663 SONSRAY MACHINERY LLC 69.82 175940 10/24/2024 PRINTED 000189 SOUTH COAST AIR QUALITY M 707.00 175941 10/24/2024 PRINTED 004977 CHARTER COMMUNICATION 257.15 175942 10/24/2024 PRINTED 000718 STAPLES ADVANTAGE 840.32 175943 10/24/2024 PRINTED 000289 STATE OF CA DOJ/ACCTG OFF 225.00 175944 10/24/2024 PRINTED 001115 STEAMX LLC 694.56 175945 10/24/2024 PRINTED 000016 COASTLINE GRAPHICS 874.27 175946 10/24/2024 PRINTED 005013 SWAYZER CORPORATION 54,189.39 175947 10/24/2024 PRINTED 007612 THEODORE I. BENITO 10,000.00 175948 10/24/2024 PRINTED 008106 TOTUM CORP 975.00 175949 10/24/2024 PRINTED 006769 U S BANK CORPORATE PAYMEN 22,085.04 175950 10/24/2024 PRINTED 000023 UNITED REFRIGERATION INC 146.14 175951 10/24/2024 PRINTED 005511 VULCAN MATERIALS CO. 56.20 175952 10/24/2024 PRINTED 000437 ITELIA WALKER 50.00 175953 10/24/2024 PRINTED 000562 THE WALKING MAN INC 650.00 175954 10/24/2024 PRINTED 000302 WAXIE SANITARY SUPPLY 1,105.17 175955 10/24/2024 PRINTED 008256 WESTERN A/V 5,807.52 175956 10/24/2024 PRINTED 002212 HD SUPPLY CONSTRUCTION 3,828.09 175957 10/24/2024 PRINTED 000144 YAMADA CO INC 998.62 175958 10/24/2024 PRINTED 000544 ZEP MANUFACTURING CO 834.37 175959 10/24/2024 PRINTED 007777 Aatari, Inc. 12,850.00 175960 10/24/2024 VOID 007777 Amir Aatari Sharghi, Bran .00 175961 10/24/2024 VOID 007777 Jonathan Cameron .00 175962 10/24/2024 PRINTED 007777 LCE Telecom 1,950.00 460 CHECKS CASH ACCOUNT TOTAL 7,461,401.17 .00 City of Carson
AP CHECK RECONCILIATION REGISTER
Report generated: 10/24/2024 17:28
User: bbrown
Program ID: apchkrcn
UNCLEARED CLEARED
460 CHECKS FINAL TOTAL 7,461,401.17 .00 ** END OF REPORT - Generated by Breana Brown **
CITY OF CARSON
File #: Version:
Report to Honorable Mayor and City Council
Wednesday, November 6, 2024, 5:00 PM
CONSENT 25. To: Honorable Mayor and City Council From: Michael George, Assistant to the City Manager {{customField.department}} {{customField.division}} Subject: CONSIDER ESTABLISHING A $25,000 REWARD FOR INFORMATION LEADING TO THE ARRESTAND CONVICTION OF THOSE RESPONSIBLE FOR THE DEATH OF CHERISE JOHNSON IN THE CITY OFCARSON (CITY COUNCIL) I. SUMMARY
This item transmits the City Council an opportunity to set a reward of $25,000 for information leading to the arrestand conviction of those responsible for the death of Cherise Johnson in the City of Carson.
II. RECOMMENDATION
APPROVE the establishment of a $25,000 reward.
III. ALTERNATIVES
TAKE another action the City Council deems appropriate and that is consistent with applicable laws.
IV. BACKGROUND
Cherise Johnson was tragically killed in a hit-and-run incident in the City of Carson on August 31, 2024, at thecorner of Del Amo Blvd. and Tillman Avenue. This item allows for the establishment of a $25,000 reward forinformation leading to the arrest and conviction of those responsible.
V. FISCAL IMPACT
The fiscal impact would be $25,000 should the reward be paid out.
VI. EXHIBITS
None.
701 East Carson Street
CITY OF CARSON
File #: Version:
Report to Honorable Mayor and City Council
Wednesday, November 6, 2024, 5:00 PM
CONSENT 18. To: Honorable Mayor and City Council From: Joshua Boudreaux, Director of Human Resources HR Administration Subject: CONSIDER ADOPTING RESOLUTION NO. 24-104, AMENDING THE CLASSIFICATION SALARYRATE FOR THE BUDGET MANAGER POSITION (CITY COUNCIL) I. SUMMARY
On August 26, 2024, the City Council approved the creation of a Budget Manager position within the Finance Department. However, the salary range used during this approval was based on the 2022 AME monthly schedule.
To align with the five percent increase approved by AME, staff needed to use Range 501 in the 2023 approved monthly salary schedule. Staff is now requesting City Council approval for this update to accurately reflect the correct salary range.
II. RECOMMENDATION
WAIVE further reading and ADOPT Resolution No. 24-104, “A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARSON, CALIFORNIA, AMENDING THE CLASSIFICATION SALARY RATE FOR BUDGET MANAGER.” III. ALTERNATIVES
TAKE another action that City Council deems appropriate.
IV. BACKGROUND
The Finance Department identified the need for a Budget Manager to handle advanced responsibilities. In response, AME consulted with Human Resources, and the review confirmed that this role was essential due to an expanded scope of duties, increased task complexity, and evolving priorities within the City's operational and strategic framework. As a result, the creation of the Budget Manager position was presented to and approved by the City Council on August 26, 2024. Although the salary code presented to the Council was accurate, the range did not reflect the most recent MOU year, prompting a request to update it in line with the five percent adjustment made on June 24, 2023.
V. FISCAL IMPACT
There is no fiscal impact from the proposed resolutions as these positions were already approved in the adopted Fiscal Year 2024-25 operating budget.
VI. EXHIBITS
701 East Carson Street
1. Resolution No. 24-104; Budget Manager
2. Budget Manager Classification Specification
Attachments
EXHIBIT NO. 1-Reso No 24-104 Budget Manager
EXHIBIT NO. 2-Budget Manager.pdf
EXHIBIT 1
RESOLUTION NO. 24-104
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARSON,
CALIFORNIA, AMENDING THE CLASSIFICATION SALARY RATE ,
RESOLUTION NO. 24-076, BY ADOPTING A NEW SALARY FOR BUDGET
MANAGER
WHEREAS, Section 503 of the City’s Charter provides that the City Council shall determine, by ordinance or resolution, the amount and type of compensation to be paid to all City officers, department heads and employees; and
WHEREAS, The Director of Human Resources is authorized and directed under provisions of Sections 2797.1 of the Carson Municipal Code and Section II, Rule II of the City Personnel Rules to prepare and recommend position classification and compensation plans, after consultation with the affected Directors, which becomes effective upon approval by the City Council; and
WHEREAS, Rule III of the City of Carson Personnel Rules provides that modification to the classification plan, embodied in Resolution No. 24-076, shall be made only after the authorized Human Resources staff members consults with the affected Directors and affected recognized employee organizations; and
WHEREAS, The City has reviewed the needs and services of the Finance Department and determined that, to improve its services to the City of Carson and efficiency of the Finance Department, the City of Carson desires to adopt the classification specification of BUDGET MANAGER to ensure the service and efficiencies; and
WHEREAS, The Director of Human Resources has consulted with the affected parties and has met and conferred with the representatives of the affected recognized employee organizations pursuant to its obligations under the MMBA, concerning the classification specification for the BUDGET MANAGER.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CARSON, CALIFORNIA, DOES HEREBY RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS:
SECTION
1. The foregoing recitals are true and correct and are incorporated herein by reference.
SECTION 2. The updated classification for the BUDGET MANAGER position will be utilized from Salary Range 501 in AME MOU, as approved on June 24, 2023, reflecting the current job roles and responsibilities, and is hereby adopted.
SECTION 3. In the event of any conflict between this Resolution and any prior City resolution relating to the subject matter hereof, this Resolution shall supersede and prevail over the prior resolution to the extent of the conflict.
SECTION 4. The City Clerk shall certify to the adoption of this resolution and deem it effective as of November 6th of 2024 the same shall be in force and effect.
PASSED, APPROVED AND ADOPTED this 6th day of November 2024.
Lula Davis-Holmes, Mayor
APPROVED AS TO FORM:
Sunny K. Soltani, City Attorney
ATTEST:
Dr. Khaleah K. Bradshaw, City Clerk
STATE OF CALIFORNIA)
COUNTY OF LOS ANGELES) SS:
CITY OF CARSON)
I, Khaleah Bradshaw, City Clerk of the City of Carson, do hereby certify that the foregoing Resolution, being Resolution No. 24- 104, was passed and approved by the City Council of the City of Carson at its meeting held on November 6, 2024, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
By:
Dr. Khaleah K. Bradshaw, City Clerk
City of Carson
Class Specification
City council Reso. No.: 24-084
AME EXHIBIT 2
FLSA: Exempt
BUDGET MANAGER
Job Summary
Under the direction of the Director of Finance this professional management position is responsible for the development and management of the City’s budget, financial analysis, and planning. This position plans, organizes, and manages the budget and long- term financial planning processes, performs complex and technical analysis, financial projections and forecasts, and works with all city departments to develop budgets.
ESSENTIAL DUTIES
(These functions are representative and may not be present in all positions in the class.
Management reserves the right to add, modify, change or rescind related duties and work assignments.):
• Manages, coordinates, and oversees the City’s budget process with all city departments, including meeting with department staff to create revenue, payroll and other expenditure budgets, provides complex financial analysis and develops various financial reports. • Provides technical advice and assistance to departments regarding the budget process and procedures. Reviews budget details and narratives submitted by departments for accuracy and work with departments to resolve problems.
• Conducts extensive research of external markets, legislation, and analysis to determines impacts to City operations and performance to formulates revenue and expenditure forecasts and convey detailed recommendations for annual budgetary proposals, modifications, and adjustments.
• Coordinates with department directors and staff to prepare operating budgets, the five-year capital improvement plan, budget modifications, and adjustments. Develops and conducts budget process training.
• Performs and coordinates the integration of budget changes, amendments and transfers in the budget system and assures alignment with the chart of accounts. Researches, develops, and prepares revenue and expenditure analysis and monthly budget status reports.
• Manages the budget system, maintains system integrity, chart of accounts alignment, system, and process documentation. Coordinates budget system updates and modification and end-user training.
• Presents and communicates financial information in a timely, accurate, understandable and meaningful form to City Council, City management, various Commissions and the public as required.
• Provides budget analytical support for collective bargaining negotiations, including budget analysis and reports and costing of proposals.
City of Carson
Class Specification
City council Reso. No.: 24-084
AME
FLSA: Exempt
• Develops and/or reviews City -wide Indirect Cost Allocation Plan and determine billable rates.
• Evaluates software systems to ensure property system controls and efficiency. Implements new software as needed.
• Trains, motivate, and evaluates assigned staff; establishes standards of productivity and performance; prepares and presents employee performance reviews and action plans, as needed; provides or coordinates staff training; recommends employee recognition; and oversee daily operations.
• Conducts budget audits and reviews; advises Director of Finance & City Treasurer on budgetary, financial, or other departmental matters.
• Builds and maintains positive working relationships with coworkers, other City employees, and the public using principles of good customer service. • Performs other special projects and duties as assigned.
QUALIFICATIONS
A typical way to obtain the requisite qualifications to perform the duties of this class is as follows:
Education and/or Experience:
• Bachelor's degree from an accredited college or university with major course work in accounting, financial management, business administration, public administration, economics, or a closely related field, or any combination of education and experience tha t provides equivalent knowledge, skills, and abilities is required. A master’s degree in accounting, budgeting, financial management, or a related field is preferred. Five (5) years of performing increasingly responsible professional experience in finance, budgeting, or accounting is required. At least two (2) years of experience supervisory
License:
• Possession of a valid California Class C driver’s license. Employee in this classification will be enrolled in the Department of Motor Vehicles (DMV) Government Employer Pull Notice Program, confirming possession of a valid driver’s license and reflecting the driving record.
Knowledge of:
• Principles, practice, and objectives of public sector budgeting include development, preparation, adoption, implementation, evaluation, and performance monitoring, auditing and reporting.
• Local government operations, functions, and relevant federal, state, and local public policies and fiscal requirements pertinent to local government.
• Project management principles and practices experience, including experienced user of project management software, and the ability to apply concepts to effectively communicate City of Carson
Class Specification
City council Reso. No.: 24-084
AME
FLSA: Exempt
(written and verbal). Collaboration, and lead projects and teams to guide and define practice and process change.
• Principles and practices of effective employee supervision, including selection, training, evaluation, discipline, team building and employee growth. • Principles and methods of administration, including goal setting and policy and procedure development.
• Principles and practices of financial software systems, including software used to develop municipal budget books.
Skill and Ability to:
• Develop and maintain effective partnerships and working relations with coworkers, representatives from other entities and departments, boards and commissions, and the public.
• Research, prepare, and present clear, concise, and complete financial reports and complex financial and budget information to a variety of audiences, including but not limited to City Council, in writing and verbally.
• Analyze, validate, verify, and document methods and sources to substantiate the accuracy of financial and statistical data and information.
• Compose clear and comprehensive budget polices, procedures, guidelines, budget narratives, staff reports, presentations, and budget process and system documentation. • Develop automated comprehensive budgeting and reporting fiscal management systems using computer applications in the preparation of complex budget financial and written reports.
• Plan, organize, assign, direct, review, and evaluate the work of professional, technical, and clerical staff.
• Review and verify accuracy of financial data, information, and associated legal documents. • Analyze, evaluate and reconcile complex financial data to arrive at accurate conclusions and recommendations.
• Perform accurate mathematical and statistical calculations. • Exercise sound independent judgment within established procedure guidelines; Communicate clearly and concisely, both orally and in writing.
Working Conditions:
Employee accommodation for physical or mental disabilities will be considered on a case-by- case basis. Positions in this class normally:
• Require vision (which may be corrected) to read small print. • Perform work which is primarily sedentary.
• Is subject to inside environmental conditions.
City of Carson
Class Specification
City council Reso. No.: 24-084
AME
FLSA: Exempt
• May be required to attend periodic evening meetings and/or to travel within and out of District boundaries to attend meetings.
• May be required to work evenings or weekends.
CITY OF CARSON
File #: Version:
Report to Honorable Mayor and City Council
Wednesday, November 6, 2024, 5:00 PM
CONSENT 17. To: Honorable Mayor and City Council From: Michael George, Assistant to the City Manager CMO Administration Subject: CONSIDER AN UPDATE ON CITY COMMISSIONS (CITY COUNCIL) I. SUMMARY
This report provides an informational update to the City Council on the recent activities of City Commissions.
II. RECOMMENDATION
RECEIVE and FILE this report.
III. ALTERNATIVES
TAKE another action the City Council deems appropriate and that is consistent with applicable laws.
IV. BACKGROUND
Updates on recent and planned Commission activities are included below.
Economic Development Commission
The Economic Development Commission convened its monthly meeting on October 3, 2024, at DignityHealth Sports Park. The meeting included an overview of preparations for the 2028 Olympic andParalympic Games being made at Dignity Health Sports Park and California State University, DominguezHills. An Overview of the 2024-2025 Fiscal Year Economic Development Division Work Plan waspresented by Economic Development Manager, Eric Romero.
Environmental Commission
The Environmental Commission (EC) meeting scheduled for October 2, 2024, was canceled so thatmembers could participate in a beautification event at Anderson Park, which took place on the same day.This event was held in collaboration with Community Services and the Parks, Recreation, and CulturalArts Commission. The next EC meeting is set for Wednesday, December 4th, at 6:30 p.m. at City Hall.
Public Works Commission
The Public Works Commission met on October 14, 2024. Commissioners decided to set November’smeeting date for November 18, 2024 since November 11 is Veteran’s Day. Commissioners continued discussing an item from a previous meeting regarding a speed hump request on E 220th Street. Relatedto this request, staff presented an update on the Safe Streets and Roads for All Grant which was recentlyawarded to the City and will allow the City to explore alternative traffic calming measures. Staff providedan update on the Carson Streetscape Master Plan. Commissioners reviewed an item for a pedestriancrossing at Jay Street on Main Street. The Commission also heard from residents regarding severaltraffic and aesthetic concerns 701 East Carson Street
Human Relations Commission
On October 16, 2024, the Human Relations Commission successfully held their regular monthly meeting.A summary was given from the Commissioners who represented HRC at the City Council Meeting onOctober 1st as Proclamation Recipient for the Bullying Prevention Month, recognized by our Mayor andCouncil. All Commissioners will follow up in-person with the schools around November for encouragingparticipation of the Rising Star Essay Contest. The Food Pantry Ad Hoc Committee reported on theirmonthly effort of donation dropping off in September, with God’s Army boxes of fresh produces, andcontinued their monthly collecting efforts to support CSUDH students. The Human Relations Commissionwill reconvene in November for their regular meeting.
Parks, Recreation, and Cultural Arts Commission
The Parks, Recreation, and Cultural Arts Commission convened on Thursday, September 26, 2024. Thecommissioners and Community Services/Recreation/Park Maintenance Department discussed two majortopics: the Long Beach Kids Zone Ordinance and the relocation of the PRCAC meetings. The first topicwas introduced by one of the commissioners. Upon discussing it, it was decided that more research andoutreach is necessary before serious consideration. The Community Services department will reach outto various groups and bring forth the information for a proper discussion. Regarding the relocation ofthe PRCAC meetings, it was decided that the best option is for half of the meetings to be held in theCarson Event Center and the other half to be held at various park sites. By allowing parks to hostmeetings, we will encourage residents to become more involved in the welfare of their parks and providethem with another space to voice their concerns and suggestions. At the next meeting, the CommunityServices staff will be proposing the schedule for the upcoming year. The next Parks, Recreation, andCultural Arts Commission meeting is scheduled for Thursday, November 7, 2024, at 6:30 p.m. in theCarson Event Center, Carson Dominguez Room.
Planning Commission
See Exhibit 1.
Public Relations Commission
The Public Relations Commission met on Tuesday, October 22, 2024. We discussed the Why I LikeCarson Contest and submission dates, along with changing our meeting time to 11 am . Our commissionwill be dark for the months of November and December and will meet again on January 21, 2025.
Public Safety Commission
The Public Safety Commission met on Thursday, October 17 and successfully had a quorum. In thismeeting we welcomed our new commissioner, Lawrence Flinton. We gave him a chance to introducehimself to the rest of the commissioners. Afterwards we proceeded to have an open discussion with thecommissioners on topics related to Public Safety.
Senior Citizens Advisory Commission
The Senior Citizen Advisory Commission met on Monday, 10/14/2024, in the Carson Event CenterActivity Room. The meeting began with the confirmation of a full quorum, followed by the Pledge ofAllegiance and approval of the 10/14/24 agenda and minutes from 9/9/24. Votes were recorded andnoted. Pauline Davis, recently appointed member to the Senior Citizen Advisory Commission, introducedherself, adding that she has lived in Carson over 25 years, enjoys the city, and wishes to become moreinvolved. She was accompanied by her husband, Bill Davis, who introduced himself and stated that hehad been retired from the military for 27 years. Staff members provided updates on a range of currentand upcoming Carson programs and events including the Senior Information & Resource Fair onThursday, November 7, 2024, the Holiday Tree Lighting Ceremony on Thursday, December 5, 2024, andthe Senior Christmas Luncheon on Friday, December 6, 2024, to be held at the Carson Event Center. Abrief discussion was held regarding the mayor's request to have the chair or vice chair of eachcommission attend a City Council meeting to provide a summary of the recent activities of theircommissions. This matter will be discussed further at the commission's November meeting. Followingoral communications by the commission and staff, a unanimous vote was cast to adjourn the meeting at4:50 pm. Due to Veteran's Day on November 11, 2024, the next Senior Advisory Commission meetinghas been rescheduled for Monday, November 18, 2024, at 4:00 p.m. at the Carson Event Center.
Veterans Affairs Commission
The Veterans Affairs Commission met on Monday, October 21, 2024. During the meeting, a guestinquired about establishing a designated area in the city for the proper disposal of worn-out flags. TheChair informed attendees that residents can drop off their old flags at the fire station and the VFW, wherethey will be disposed of respectfully and appropriately. The Commission does plan on spreadingawareness of these programs so the community is informed and will know more about how and wherethey can dispose of their flags. It was decided that the Commission will provide a training on flagetiquette and presentation to the Recreation Center Supervisors during one of their upcoming meetings.The commission continues to provide feedback on their respective assigned parks, advising theRecreation Division on flag presentation and other maintenance concerns.
Women’s Issues Commission
The Women's Issues Commission continues to explore ways to support the City of Carson and has madesignificant progress on the community survey aimed at understanding the needs and concerns of womenin the city. In addition to the survey, the commission is in the early stages of developing a clothing drivefor women in Carson who are in need. They will continue to engage with the community and further theirmission of addressing women's issues within the city.
Youth Commission
The Youth Commission met on Wednesday, October 9, 2024. Adult Sports Coordinator Matt Jordanattended the meeting to introduce himself and provide an overview and history of the Golf TournamentFundraiser. The Commissioners were very engaged with Matt and were eager to share ideas and askquestions as they will be working with him on the Golf Tournament Fundraiser Subcommittee. Thecommissioners continued to provide feedback on their observations after visiting their assigned parksand meeting with the park supervisors.
V. FISCAL IMPACT
There is no direct fiscal impact associated with this report.
VI. EXHIBITS
Planning Commission Update
Attachments
Planning Commission Update
Planning Commission Report
October 2024
1 | P a g e
Planning Commission October 8, 2024
1. Conditional Use Permit (CUP) No. 1102-20 and Design Overlay Review (DOR) No. 000012-24 Applicant: Rengel+Company, Architects Inc
Property Owner: Prologis USLV NEWCA 4 LLC
Subject Property: 24760 Main Street (APN # 7406-025-031)
Request: A request for approval of truck related activities within 100 feet of residential properties
2. Development and Site Plan Review 00010-24, State Residential Density Bonus Application RDB-00001-24, Vesting Tentative Tract Map 00002-24, and Addendum to Carson 2040 General Plan Update EIR
Applicant: 21140 Avalon Blvd, LLC
Property Owner: Margaret C. Kott, Trustee
Subject Property: 21140, 21212, and 21126 Avalon Blvd. (APN 7337-003-012, 7337-003- 013, 7337-003-014
Request: A request for approval of a 315-unit residential development.
Planning Commission October 22, 2024
1. Modification of Conditions of Discretionary Permit (MOD) 00001-24
Applicant: Sara Houghton Michael Mulligan
Property Owner: Grace Orthodox Presbyterian Church
Subject Property: 22511 Figueroa Street (APN # 7341030007)
Request: A request to modify the conditions of approval for Tentative Parcel Map (TPM) TPM 100000-21, Tentative Parcel Map No. 82951
CITY OF CARSON
File #: Version:
Report to Honorable Mayor and City Council
Wednesday, November 6, 2024, 5:00 PM
CONSENT 18. To: Honorable Mayor and City Council From: Michael George, Assistant to the City Manager CMO Administration Subject: CONSIDER AN UPDATE ON CITY PROJECTS (CITY COUNCIL) I. SUMMARY
This report transmits a monthly ongoing informational update to the City Council, at Mayor Davis-Holmes’ request, regarding various City projects that are underway or will begin soon. Detailed updates on projects are provided in the following City function areas: Community Development Department (Exhibit 1), Public Works Department (Exhibit 2), Information Technology Department (Exhibit 3), and the Public Safety Department within the City Manager’s Office (Exhibit 4).
Ongoing updates will be provided to the City Council as these and other projects continue to develop.
II. RECOMMENDATION
RECEIVE and FILE this report.
III. ALTERNATIVES
TAKE another action the City Council deems appropriate and that is consistent with applicable laws.
IV. BACKGROUND
The projects included in this report are meant to provide an update on current projects underway and those that willbegin soon.
V. FISCAL IMPACT
The purpose of this item is to provide information only and there is no direct fiscal impact associated with this staff report. Most of the projects included within this report have fiscal impacts and these expenditures have either already been approved by the City Council or will be presented to the City Council for approval once ready and as needed. Any item that staff identifies as needing additional or new funding beyond the budgets that were previously approved by the City Council will be addressed separately from this report.
VI. EXHIBITS
1. Community Development Projects2. Public Works Projects3. Information Technology Projects4. Emergency Management and Public Safety Projects 701 East Carson Street
Attachments
Community Development Projects
Public Works Projects
Information Technology Projects
Public Safety and Emergency Services Projects
COMMUNITY DEVELOPMENT
PROJECT STATUS REPORT
11-6-24 City Council
Name Description Status
Carson Lane 20207 S. Avalon Blvd; Existing: Imperial Avalon Mobile Home Park. Proposed: Imperial Avalon Specific Plan by Faring on
27.31 acres, 1,213 dwelling units (653 non -age-restricted multi-family units plus 180 age -restricted senior
independent living units plus 380 townhouse units and two sit-down restaurants.
In plan check
Kott property
at Avalon and
213th St.
21140 S. Avalon Blvd: Existing: automobile dealerships and vehicle storage.
Green Law has filed an application for a
100,000 square-foot Tesla Sales, Service,
Delivery, and Collision Center. In review.
Waiting for applicant’s response. Tesla
application has been withdrawn.
The District
Specific Plan
Amendment
Carson Goose
Owner LLC
The developer, Carson Goose Owner LLC, which was selected by the CRA Board through an RFP process, is proposing
1,567,090 sf of light industrial and 33,800 SQFT of
restaurant/retail space on Planning Area 3 (cells 3, 4 and
5.) The site also includes a 22, 740-sf dog park, a 3,343 -sf performance pavilion, 25,400 sf children’s plan area, 19,400 sf botanic garden, a 19,490 sf bioretention garden, a 1,800 sf beer garden, a 2,975-sf sculpture garden, a 4,425 sf water feature and iconic element, a 35,210 sf flex event lawn area, 50,774 sf of planted open spaces, and 52,159 sf of planted buffer areas for a total of 273,906 sf (6.29 acres) of
programmed spaces, and open space / amenity areas. There is also a 0.62 -acre linear park to the west of the light industrial uses. The total site area is 96 gross acres (85.55 net acres.) The developer has filed for the following
applications: Development Agreement, General Plan
Amendment, Specific Plan Amendment, Site Plan and Design Review, Noise Variance and Tentative Parcel Map.
In plan check.
Kim Family
Trust
21240-21250 Main St. Existing: Empty lot. Proposed: 19-unit market rate apartment consisting of two separate three - story buildings, at grade parking with associated common and private open space.
In plan check
Santiago De
Leon
20926 Jamison St., Existing: Single Family Residence.
Proposed: 2 single family residences with associated at grade parking, common and private open space.
Approved
Ken S. Chea
Trust
21530 Martin St., Existing: Single Family Residence.
Proposed: 4-unit residential subdivision.
Approved
Golden State
Alliance, LLC
138 W. 223rd St. Existing: Single Family Residence. Proposed:
10 attached condominiums consisting of two separate
buildings with all market rate units, at grade 2 car garages, guest parking and private driveway.
Under Review
Name Description Status
Comfort
Properties,
LLC
140 W 223 rd. Proposed: Single Family Residence. Proposed:
2 detached single family residences, each on their own
subdivided lot with associated at grade parking common and private open space.
Approved
Starbucks /
Multi-tenant
shopping
center
860 E. Carson St #108-109 - Martial Arts studio and mod to shared parking CUP
Under Review
In-n-Out 20700 Avalon Blvd. Existing: portion of South Bay Mall parking lot. Proposed: In -n-Out restaurant with indoor and outdoor seating and associated parking (including drive - thru).
Under construction
Chevron 17453-17455 Central Ave. Existing: Chevron service station with McDonald’s restaurant. Proposed: Add a new self -
service car wash.
Under Review
21611 Perry
Street LLC 21611 S. Perry St. Existing: Empty lot. Proposed: Self storage facility comprised of approximately 120,000 square feet in a mix of one and two -story buildings and a 5,000 square foot retail component.
In Plan Check
Carson Main
Street LLC
20601 S. Main St. Existing: Vacant lot (Formerly KL Fenix).
Proposed: three industrial buildings comprised of
approximately 256,000 square feet including 137,000 square feet of warehouse, 92,000 square feet of manufacturing, 23,000 square feet of office, and 4,000 square-foot retail pad with 419 parking spaces, 18 dock doors, 6 at grade doors, and 3 trailer stalls.
Approved
First Industrial
Realty Trust
18001 S. Main St. Existing: Gasket Manufacturing Company, Inc. Proposed: one industrial building comprised of
approximately 60,000 square feet including 52,000 square feet of warehouse, 7,500 square feet of office space with 40 parking stalls and 8 dock doors.
In Plan Check
Centerpoint
Properties
Trust
16627 S. Avalon Blvd. Existing; Durham School Services.
Proposed: one industrial building comprised of
approximately 122,000 square feet including 114,000 square feet of warehouse, 5,000 square feet of office, 2,500 square feet of mezzanine with 107 parking stalls and 24 dock doors.
Construction complete
Watson Land 2277 E. 220th St. Existing: two -story office buildings.
Proposed: one industrial building comprised of
approximately 74,060 square feet of warehouse with 72
onsite parking stalls.
Under Review
USPS/
Prologis
24760 Main St., Permit trucking activities (existing building) within 100 feet from residential properties.
Under Review – Project was continued by the
Planning Commission on 8/22/23. Staff met
Name Description Status
with residents who were present at the
Planning Commission meeting on 9-28-23.
Applicant will hold a community meeting prior
to the project going back before the Planning
Commission for decision. Staff met with
members of the community to share the
changes for the project. A larger community
meeting will be held at a later time. Staff is in
communication with Prologis to make the site
more compatible with the surrounding
neighborhood. Staff held a community
meeting to hear community concerns. The
applicant will be making changes to plans
suggested by the community and staff. The
community’s response was positive to the
changes. The project will be rescheduled for a
Planning Commission hearing. Staff will be
meeting with a new tenant for the property.
The new tenant would like to present their
proposed use to the community. The property
owner has introduced another new tenant
with a new site plan. A community meeting
will be set up to present the operations of the
new tenant to the nearby residents.
Rexford
Industrial, LLC
1055 E. Sandhill Ave. Existing: Formerly: General Mills processing facility. Proposed: one industrial building comprised of approximately 126,000 square feet including 122,757 square feet of warehouse, 3,256 square feet of
mezzanine with 130 parking stall s, 20 dock doors, and 2 grade level doors.
Under Construction
LiT 9th St.
224rd Carson
LP
2104 E. 223 rd St. Existing: Formerly: Poly One Corporation facility. Proposed: one industrial building comprised of approximately 130,000 square feet including 124,324 square feet of warehouse, 5,000 square feet of office, 5,000 square feet of mezzanine with 122 parking stalls and 15 dock doors.
In Plan Check
BSREP III
Dominguez,
LLC
2001 E. Dominguez St. Existing: Western Tube & Conduit
Corporation. Proposed: one industrial building comprised of approximately 424,000 square feet including 408,990 square feet of warehouse, 15,000 square feet of office with 283 parking stalls, 136 trailer parking stalls and 68 dock doors.
In Plan Check
City of Carson Prohibition of storage of hazardous materials Under Review, New buildings in industrial zone over 5,000 square feet requiring a CUP is
scheduled for April 5th City Council meeting,
continued off calendar by City Council
Subcommittee has met with the business
community and has obtained their input
Approved by City Council. Staff has notified
over 2,000 business that maybe effected by
Name Description Status
the ordinance that requires submittal of an
application for Director’s Permit. Staff has
received applications from businesses. Next
step is to issue an RFP to hire an inspection
consultant.
California
Water Service
Group
21718 S. Alameda St., California Water has completed
construction of a new groundwater production well to
provided potable water to the public. Water quality of a new well has been established and has provided design
parameters for the future onsite improvements. A new
building will be used to house the well appurtenances,
electrical, controls and pumping equipment. The preliminary building will be approximately 1,000 square feet.
In plan check.
City of Carson Carson 2040 General Plan Update, the Housing Element update will be presented to the Planning Commission in
January and to the City Council in February to meet the state mandated deadlines.
HCD informed the City the adopted housing
element meets the statutory requirements of
State Housing
Element Law. However, the housing element
cannot be found in full compliance until the
City has completed necessary rezones to
address the shortfall of sites to accommodate
the Regional Housing Needs Allocation
(RHNA). The 1st Phase of the Zoning Code has
been sent to HCD to seek certification of the
Housing Element.
Approved by City Council April 4, 2023.
The next steps are the implementation of the
General Plan and the Housing Element.
Avocet
Battery
23320 Alameda, A 200 -megawatt Battery Energy Storage
system on an approximately seven -acre site that will help augment Edison during power shortages
Scheduled for City Council consideration on
August 6th.
VESI 18800 Broadway, a 100-megawatt Battery Energy Storage system on an approximately three-acre site that will help augment Edison during power shortages
Under Review
Chris Barker 605 W. 228 th St, Proposed closure of existing Ocean Villa mobilehome park
Under Review (inactive)
QES
Incorporated
18101 Avalon Blvd, 30-unit condominium development on a former Church site
Under Review
Vivian 222 E. 220th St, four detached single-family homes.
Under Review
Pepsi Co. 19700 S. Figueroa St, Installation of EV Chargers for the Pepsi Co. fleet vehicles onsite.
Under Construction
Moshar 123 E. 223rd Street, 9-unit condominium development Under Construction Stan Lucas 747 E 223rd St., CUP 1085 -18 -Ambulance facility and medical equipment storage.
Under Review
City of Carson Continued the development of the Carson Enhanced Infrastructure Financing District (EIFD).
The EIFD Board approved its FY 24-25 budget
including authorizing $300,000 for Victoria
Golf Course predevelopment studies and
plans.
Name Description Status
City of Carson Short Term Rentals A subcommittee meeting was held and Subcommittee provided direction to staff. City
Attorney’s office will be drafting the
ordinance.
City of Carson Variety of housing related ordinances, such as Below Market Rent (establishment of fees to assist in increasing affordable housing unit inventory), SB 9 (allows up to 4 units per existing legal lot or allows lot split for existing legal lots to allow 2 units per lot for a total of 4 units), SB330 (a requirement to replace housing units that are demolished) Approved
Maupin
Development
Existing: 215 W. Carson Street, 64,500 SF (4 lots), comprised of 3 single -family homes, storage sheds and an unpaved empty lot. Proposed: 35 Townhomes – two floors over
parking; 29 units/3 bedrooms; 6 units/2 bedrooms with
common and private open space.
Under Review
Anastasi
Development
Existing: 336 E Carson Street, 90,000 SF (lot), formerly a collection of automotive repair businesses within two multi- tenant buildings measuring a total of 40,000 SF. Proposed:
50 Townhomes – two floors over parking; all 3 bedrooms/2 baths with common and private opens space.
Under Review
City of Carson Commercial Façade Program for retail centers Six Funding Agreements were approved by the City Council’s consideration on May 7th.
Staff is working with property owners to
obtain 100% participation for the East Carson
Street project. Three Funding Agreements
have been completely executed. Structural
and architectural design for the Victoria Park
Plaza has been initiated.
City of Carson Business Grants
86 checks for a total of $1,670,000 have been
issued to businesses with $721,625 remaining
in the budget from the total $2,400,000
allocated to this program (includes $8,375
Wizehive Contract).
Trophy
VPC, LLC
Mural installation at FAB Automotive
Approved by Planning Commission,
Appealed by Councilmember Dear tentatively
scheduled for October 18th.
City Council approved Mural #2 and requested
staff to process a comprehensive sign code
amendment
Infinity CF, LLC
23820 Avalon
Blvd.
Two lot subdivision with a proposed Starbucks on one
parcel and a carwash on the other.
Under Review (The proposed carwash and
Starbucks were approved by the Planning
Commission on 8/22/23)
PAR 1675-22 Eight (individual) SFR each with a detached ADU. Pre-Application Review is complete. Comment letter including all routing and planning
comments was sent to the applicant on 8/8.
Watson Land. 22418 and 22650 Bonita Demolition of two warehouse buildings measuring 147,500sf and 41,400sf, respectively, and construction of one spec warehouse building
measuring 161,000 sf in conjunction with a lot merger.
Approved
Name Description Status
Tesla Charger Admin DOR 1907-22. 2 Civic Center Drive, DoubleTree Hotel, Installation of eight EV charging posts and two
equipment cabinets.
Constructed, waiting for SCE to provide power
Tesla Charger Admin DOR 1911-22 801 E Carson St. Community Center, Installation of 20 EV charging posts and five equipment cabinets.
Under Construction
AT&T Proposed new wireless installation on face of building at 20715 S. Avalon
Under Review
Vinfast Vinfast electric car showroom, service center, and car storage for delivery to customers
Will be vacating the site (business decision)
Sywest Specific Plan, General Plan Amendment, Development Agreement, DOR for development of a big box user and
associated retail
Under Review
The Notice of Preparation was issued on April
24, 2023
Applicant has resumed project meetings.
Brownfield
Grants
Equitable Community Revitalization Grant (ECRG) Round 2 and EPA Grants
Three ECRG Grants have been awarded for
$875,000 plus an EPA grant for $500,000. The
implementation phase will follow.
Arris Studio
Architects
888 E. Dominguez St.
Marriot TownePlace Suites Hotel and new bar/lounge, (111 key)
In plan check
MSD 20920 Chico St.
New senior health care facility within an existing 17,792 SF building, remodel building and provide site improvements:
parking, landscape
Complete
Brandywine
Carson
Landing
Corner of Central Ave.
and Victoria St.
175-unit condominiums, recreation center and dog park
Previously a vacant lot
Under construction
Target Drive-up Canopies for existing parking spaces
Under Review
Carson Hybrid
Energy
Storage
17171 Central Ave - Upgrade Existing energy storage facility Processing application (+ MWELO approved / to be completed)
Shell Oil 20945 Wilmington Ave -
CNG Dispensing Station
Approved / In Final Plan Check / +MWELO
review
Air Products
23300 Alameda - Hydrogen Pipeline Approved / In Final Plan Check - Engineering + MWELO review
Amer Khan 310 W. 220 St. - Addition to MF unit that exceeds $50k valuation
In Review
Birch Specific
Plan
21809-21811 S. Figueroa St. - 4-story, 32-unit condominium development with public seating & public art
Partially constructed and going through
ownership change. Construction could restart
by end of the year
DISH Wireless
LLC
17900 S Central Ave. - Replace existing lattice tower with stealth wireless communications facility
Approved
Name Description Status
Bethel Baptist
Church
1631 E. Carson St – 2nd floor extensions and new fellowship hall added to existing church
DOR 991-07 Modification #2
Approved
City of Carson Resolution 21-2713: Recommend amendment to Site Plan and Design Review development procedures. ZTA 188-2021
Approved
Argo
Warehouse
439 W. Gardena – New 3,754 SF warehouse Under construction
The Boy & The
Bear
139 W Victoria St. - Coffee roasting operation and on-line fulfillment center for wholesale roasted coffee
Approved
Edward
Byungyull
Kwon & Judy
Jeongyang
Kwon
20915 S. Lamberton Ave - Renovate existing site for a new truck parking facility
Complete (site vacated)
Southbay
Tattoo
22811 S. Figueroa St. - Tenant Space No. 22813: Request for a CUP for a tattoo business (relocating from another Carson property)
Approved
Single Family 140 E. 218th Pl. – Expand a 1-car garage into an attached, two-car garage and remodel (e) single-family house.
Approved
Mobile Mini 22632 S. Alameda St. - The project site will be developed for construction of a Cargo container storage facility that will consist of three modular office units and a maintenance canopy structure on a 14-acre site.
Approved
Link Logistics 100 W. Alondra Blvd.- Redevelopment of 13.06-acre site, including demolition of 2 existing buildings. Development consists of 2 new warehouse facilities. Building 1 covers 185,921 s.f. w/ 5,000 s.f. office & 3,000 s.f. mezzanine.
Building 2 covers 106,677 s.f. w/ 5,000 s.f. office, & 3,000 s.f. mezzanine. Buildings will be supported by screen truck yards, vehicular parking areas, drive aisles and landscaping throughout. The larger northerly building will also have trailer storage parking.
Under construction
City of Carson Comprehensive Zoning Code Update to implement the General Plan. Multiple development standards and policies guiding the implementation of the General Plan will be
amended modified and updated to be consistent with state law.
NOTE: This update excludes the non-residential portions of the code which will be prepared and presented at a later time.
Draft is underway and will be presented to
Planning Commission in next few months.
Staff will hold a study session prior to public
hearing. On July 25th, Planning Commission
held a workshop and will consider the Phase 1
of the zoning code in a public hearing
tentatively scheduled for August 22nd. This
project was heard by the Planning Commission
on 8/22/23. The commission continued this
item to 9/12/23.
Tentative target dates for Phase 1 (excludes
commercial and industrial) are: Planning
Commission January 30, 2024 and City Council
March 5, 2024
Scheduled for 1-31-24 Planning Commission
Phase 1 approved by City Council
Name Description Status
Jack N the Box Demo existing commercial bldg. propose approx. 1,800 SQFT drive-thru restaurant
Denied by the Planning Commission.
30 unit
Multifamily
Application to demolish existing church and build 30
condos
Under review
Air Products Proposal for a new modular bldg. with parking lot Applicant received status letter awaiting response, revised plans have been submitted
and are under review
Office to
Warehouse
conversion
Demolish existing office to construct new warehouse on the corner of 220th and Arnold Center
Under Review
Harley
Davidson
20507 Belshaw Avenue, EV Motorcycle Dealership (Harley
Davidson/Live Wire)
Under Review
Petroleum
Tanks
Installation of two petroleum tanks at an existing tank farm.
Capacity increasing from 22 to 24 storage tanks.
Approved by Planning Commission
AT&T
Monopine
Foisia Park
23410 Catskill, Wireless Communication antenna Under review Tambuli
Seafood
Market
22200 S Main Steet, Expansion of an existing suite within an existing shopping center.
Under Review
Hyundai
Dealership
2201 E. 223rd St, New Service Building Approved by Planning Commission
Freeway Tires 2121 Alameda St., truck tire repair business Approved by Planning Commission March 12th
Grace
Orthodox
Presbyterian
Church
A request for approval of a Tentative Parcel Map to
subdivide a 1.59-acre parcel into two parcels
Under Review
Ulta 20700 Avalon Blvd. Suite 517 (South Bay Pavilion) Interior remodeling/ build-out and exterior modifications of an
existing space
contained within an existing building. Modifications include new mechanical, electrical and plumbing work.
Under review
South Bay
Fleet
Specialist
17126 S. Broadway St. Requesting approval to operate an auto body and paint shop (w/paint spray booth addition
inside building).
Under Review
ASPCA Animal
Clinic
16300 Figueroa St. Animal Clinic development on an
industrial site that's currently vacant.
In plan check
19401 S.
MAIN ST.
Pickleball facility, indoor and outdoor courts that will also include a clubhouse at full completion.
Under Review
16325 -16407
S MAIN ST
Renovate an existing 159,373 SF industrial building on a
5.88 acre site including removing approx. 6,503 SF of
existing office/mezzanine/warehouse space, exterior
building facade improvement, interior tenant improvement and site and landscaping improvements. After renovation the new building footprint will be approx.138,616 SF. The project also includes a lot line adjustment of the parcel(s Approved
427 E. 220th
St.
Willow (formerly Cambria Ct.) - 35-unit condominiums
designed as 2-story detached homes
In Plan check
Name Description Status
23825 Avalon
Blvd.
Request to modify beer and wine CUP to allow for sale of distilled spirits for the G&M Gas Station/Mini Mart
Under Review
22511
Figueroa St.
Specific Plan, DOR, Zone Change for 33-unit residential apartment development on .69 acre lot
Under review
17126 S.
Broadway St.
A Conditional Use Permit for operation of an Auto Body and Paint shop and installation of an interior Paint Spray Booth.
Under Review
City of Carson Update and implementation of the Pipeline Franchise Ordinance. This item was recently transferred to
Community Development. Staff has been working with the Council Subcommittee to update the ordinance. In
addition, staff is getting up to date with all existing agreements to determine their status.
Under Review
21140 Avalon
Blvd, LLC
A request for approval of a 315-unit residential
development
Approved by Planning Commission 10/8/24
City of Carson General Plan Amendment to the Land Use Element of the Carson 2040 General Plan (2024GPA-001) to require
preparation of a Specific Plan prior to redevelopment of all sites that currently operate as oil or petroleum refineries within City of Carson
Scheduled for Planning Commission 11/12/24
CITY OF CARSON OCTOBER 2024
PUBLIC WORKS DEPARTMENT Monthly Report
18620 S. Broadway, Carson CA 90248
Dr. Arlington Rodgers Jr., Director
The Public Works Department is comprised of three divisions: Administration, Engineering, and Operations. The Department maintains a total area of nineteen (19) square miles of streets which also includes maintaining twelve (12) park building facilities, two (2) aquatic centers , two (2) pools , a sports complex, and a boxing and weightlifting center, Carson Event Center, City Hall, and Corporate Yard. The Public Works staff includes 116 positions with 103 full-time regular employees and 13 part-time employees.
The Public Works team collaborates both internally and externally to accomplish projects that enrich the quality of life for Carson's residents and visitors.
ENGINEERING DIVISION
The Engineering Division provides the technical foundation for a modern Public Works Department and its primary responsibility is to assist the Administration and Operations & Maintenance Divisions with project management and specialized design and construction skills. The Engineering Division determines which studies are needed to advise the department on deficiencies, regulatory requirements, compliance with applicable local, state , and federal laws, cost effectiveness, prudent approaches, and strategic plans.
These activities inform executive management and City Council in determining project priorities.
Street Improvements
• PW675: SEPULVEDA BRIDGE WIDENING FROM ALAMEDA TO EAST CITY LIMIT o Location: Sepulveda Blvd. from Alameda to East City Limit o Description: The project involves the widening and improvement of the roadway and bridge along Sepulveda Boulevard to provide three lanes of traffic in both directions, construction of new sidewalk, relocation of existing electrical poles, and the modifica tion of the existing traffic signal.
o Budget: $12,000,000.00
o Current Phase: FINAL DESIGN
▪ RKA is addressing the plan check comments from the County. ▪ Working with the Environmental Planner on updating the permits ▪ SCE is scheduling a meeting with the design team for shoofly. ▪ SCE is working with Marathon on Easements
▪ Meetings are now once a week with the team to verify progress. ▪ Aiming to go out to bid in May 2024
▪ Robert Lee is working on a letter to send to SCE he is reviewing the Franchise agreements.
▪ Utility identification is being completed.
▪ SCE has completed Potholing and is working around a conflict. ▪ Status as of February 15, 2024: Meeting with Tenant on the southeast corner for TCE.
▪ Status as of March 18, 2024: Designer is wrapping up the design, hoping to go out to bid early summer.
▪ Status as of April 24, 2024 : Designer is wrapping up the design . We are hoping to go out to bid early summer. SCE has two more poles to locate, working on securing the required permits.
Public Works Department August 2024 Monthly Report
▪ Status as of May 15, 2024: Designer is wrapping up the design. We are hoping to go out to bid by late September or early November. SCE has two more poles to locate, working on securing the required permits.
▪ Status as of June 20, 2024: Designer is wrapping up the design. We are hoping to go out to bid early summer. SCE has two more poles to locate, working on securing the required permits. Awaiting waterboard mitigation measures. ▪ Status as of July 25, 2024: No update
▪ Status as of October 30, 2024: Working with utilities, permitting agencies, final design. Tentatively scheduled to go out to bid in Mid-November
• PW919: WILMINGTON / I -405 FWY INTERCHANGE (aka: Wilmington & 223 rd - Pull Box Access Improvements)
o Location: Wilmington and 223rd St.
o Description: Construct gate, ladder, and concrete platform to provide access to traffic signal pull boxes installed under existing bridge over the Dominguez Channel, at the southwest intersection of Wilmington Avenue & 223rd Street in Carson. This item is punch list work from PW 919, and it was requested by Los Angeles County so that the traffic signal can be maintained/serviced.
o Budget: $300,000.00 from Measure M and Gas Tax
o Status: AWARD OF CONSTRUCTION CONTRACT
▪ Staff will make a recommendation to City Council on June 6, 2023, to award contract to CWS Systems. Inc. (Staff report 2023-0326)
o Status (6/22/2023): Staff report 2023-0326 to award a construction contract to CWS Systems, did not complete the Legistar approval workflow for the June 6, 2023, City Council meeting, due to concerns from Finance/City Council/City Manager’s office regarding a previous litigation matter with CWS Systems. The permit from Los Angeles County Flood Control District only allows for work in the Dominguez Channel to occur during the dry season, April 16 to October 14. Engineering Division needs clarification on how to move forward.
o Status as of July 19, 2023: No update
o Status as of August 17, 2023: Staff will be presenting staff report 2023-0326 at the September 5, 2023, City Council Meeting. Staff will be recommending awarding a construction contract to CWS Systems.
o Status as of November 20, 2023: Staff will present Staff Report 2023-0873 at the December 5, 2023, City Council meeting to award a construction contract to HZS Engineering.
o Status as of January 3, 2024: Staff is working on the approval of the certificate of insurance prior to routing the contract for signatures. Staff is also reviewing project submittals. Estimated construction start date is March 2024. o Status as of January 22, 2024: No update
o Status as of February 15, 2024: Construction contract with HZS Engineering has been executed (C24-017), purchase order is pending. Estimated construction start date is March 2024 and estimated end of construction is May 2024. Pre-construction meeting is tentatively scheduled for February 29, 2024.
o Status as of March 19, 2024: Engineering consultant (P.A. Arca Engineering, Inc.) issued revised drawings on March 8, 2024, which have caused a delay in the project. Staff is reviewing change order requests from contractor due to newly revised Civil and Structural drawings. Estimated construction start date is tentatively scheduled for March 25, 2024.
Public Works Department August 2024 Monthly Report
o Status as of April 24, 2024: Due to revised plans from design consultant received on March 8, 2024, construction started on April 15, 2024. Estimated construction completion date is May 3, 2024. Construction is currently at 85% complete. o Status as of May 20, 2024: Construction is complete. Staff is reviewing final punch list items and processing final invoices. Staff is anticipating presenting a project completion staff report to City Council during the month of June 2024. o Status as of June 20, 2024: Contractor is working on second round of punch list items estimated to be complete by June 28, 2024. Staff is anticipating presenting a project completion staff report to City Council during the month of July 2024. o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Project accepted as complete by City Council on July 16, 2024. Notice of Completion was filed on July 23, 2024. Project is 100% complete. o Status as of October 30,2024: Retention to contractor was released on 9/26/2024.
Project is closed.
• PW1393-4 & 1411-4: CITYWIDE ANNUAL OVERLAY PROGRAM AND CITYWIDE
ANNUAL CONCRETE REPLACEMENT PROGRAM
o Location: Main Street from Carson Street to Victoria St. o Description: The project includes grind and overlay, concrete road replacement, repair of damaged sidewalks, driveway approaches, curbs and gutter, access ramps, tree removal and replacement.
o Budget: $3,496,000.00
o Current Phase: PURCHASE ORDER
▪ Pending purchase order issuance.
o Status (6/22/2023): Purchase order was printed on June 22, 2023. Estimated construction start date is August 7, 2023.
o Status as of July 19, 2023: Estimated construction start date is August 2023. o Status of August 17, 2023: Construction started on August 7, 2023. Estimated completion date is December 29, 2023.
o Status as of November 20, 2023: Ongoing construction. No major updates. o Status as of January 3, 2024: Project is on hold. Kinder Morgan and Torrance Logistics Company are prohibiting the use of vibration rollers to compact the asphalt pavement near gasoline pipelines along Main Street. Staff is working on alternate construction methods to achieve the pavement compaction requirements without the use of vibration rollers which are industry standard. Staff anticipates that alternate compaction methods will cause an increase in cost and project schedule.
o Status as of January 22, 2024: No update
o Status as of February 15, 2024: Project is on hold. Phillips 66 confirmed on 11/16/2023 that they have no concerns with the use of vibration rollers above their pipelines. Torrance Logistics Company confirmed on February 12, 2024, that they have no concerns with the use of vibration rollers above their pipelines. Kinder Morgan is the only company left that is expressing concerns with the use of vibration rollers above their pipelines. Staff met with Kinder Morgan on February 13, 2024, and is expecting an official response from Kinder Morgan by February 15, 2024.
Public Works Department August 2024 Monthly Report
o Status as of March 19, 2024: Ongoing construction. Cold milling started on March 18,2024. Asphalt pavement resurfacing is estimated to be complete by April 10,2024.
Utility adjustment, traffic signal loop installation, and striping is expected to be complete by May 9,2024.
o Status as of April 24, 2024: Ongoing construction. The Contractor is currently adjusting utilities and will begin the first coat of striping on April 29, 2024. Estimated construction completion by May 31, 2024.
o Status as of May 20, 2024: Ongoing construction. Construction is 90% complete. Staff will be presenting a staff report to the City Council to request additional funding for added project scope. Estimated project completion date is June 2024. o Status as of June 20, 2024: Ongoing construction including punch list items. Amendment No. 2 was approved at the June 18th City Council Meeting. Staff is moving forward with additional project scope. Estimated project completion date is July 2024. o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Contractor is working on punch list items. Permit application to Caltrans for sidewalk improvements within Caltrans Right of Way is being finalized by staff. Expected completion date is October 2024. o Status as of October 30,2024: No update
• PW1536: BUS AMENITY AND WAYFINDING PROJECT
o Location: Various locations throughout the city
o Description: Installation of monument signs, bike racks, and wayfinding signs. o Budget: $852,859.00
o Status: Initial scope of work completed; preparing for additional work o Status as of November 20, 2023: Received Metro’s approval of reduced scope of work and time extension and scope modifications.
o Status as of December 29, 2023: Reached out to Metro to confirm grant work reimbursable or to submit new extension request.
o Status as of January 17, 2024: Confirmed with Metro that grant work is reimbursable and no new extension request is necessary.
o Status as of January 22, 2024: No update
o Status as of February 7, 2024: No update
o Status as of March 13, 2024: No update
o Status as of April 18, 2024: No update
o Status as of May 15, 2024: No update
o Status as of June 17, 2024: No update
o Status as of July 25, 2024: Waiting for wayfinding guidance from City Manager’s Office. o Status as of August 26, 2024: No update
o Status as of September 18, 2024: Metro is requesting additional information to modify project scope to use all remaining funds toward wayfinding. Waiting for updates on wayfinding design direction from City Manager’s office. o Status as of October 28, 2024: Staff submitted additional information to Metro as requested. Waiting for updates on wayfinding design direction from City Manager’s office.
Public Works Department August 2024 Monthly Report
• PW1608: MLK JR. BLVD IMPROVEMENTS
o Status as of January 3, 2024
▪ TAIT is working on the 60% plans.
▪ Awaiting the Geotechnical Report to confirm any recommendations. ▪ Dennis to go over traffic comments with the City Traffic Engineer. ▪ Plans sent over to Cal Water for their comments.
▪ 60% of the plans are due on November 29th.
▪ Will have 60% plan review meeting on December 5th.
▪ 100% of the plans should be finished by January 25th, 2023. ▪ Writing Staff report to take to council for the first meeting in February. o Status as of February 15, 2024
▪ Plans are currently at 60%, working with Cal Water for Coordination ▪ Looking at other Grant applications for cost.
▪ 100% plans by mid-March.
o Status as of March 18, 2024: 100% plans by mid-April. o Status as of April 24, 2024: Designer is developing options in design for City to consider.
o Status as of May 15, 2024: Designer is developing options in design for City to consider, currently finalizing striping.
o Status as of June 24, 2024: Designer is developing options in design for City to consider, currently finalizing striping. Expect to have plans completed by the first week in August.
o Status as of July 25, 2024: No update
o Status as of October 30, 2024: Pending County review of the street light plans, Plans and spec’s almost completed ready for advertising
• PW1641: GARDENA BLVD. STREET IMPROVEMENT
o Location: Gardena Blvd. from Figueroa to Avalon Blvd. o Description: This project includes concrete reconstruction, tree removal/replacement, asphalt concrete pavement overlay, repair of damaged sidewalks, driveway approaches, curbs and gutters, and access ramps.
o Budget: $2,060,000.00
o Current Phase: CONSTRUCTION IN PROGRESS
▪ Construction started in February 2023.
▪ Approximately 17 rain days during February and March pushed the completion date to July 2023.
o Status as of June 22, 2023: Construction is in progress. Estimated completion date is August 2023.
o Status as of July 19, 2023: Construction is in progress. Estimated completion date is August 22,2023.
o Status as of August 17, 2023: Estimated substantial completion date has been revised to August 31, 2023. Staff will begin punch list walk on the week of August 21, 2023. o Status as of November 20, 2023: FY23-24 purchase order pending approval. Once PO is approved, staff will process remaining invoices and close out the project after punch list items are completed.
o Status as of January 3, 2024: Staff is working on closing out final invoices. Staff is also working with Edison to repair handholes so that the contractor can finalize the sidewalk Public Works Department August 2024 Monthly Report
repair part of the punch list. Staff anticipates presenting a staff report to accept project as complete during the month of March 2024.
o Status as of January 22,2024: All construction punch list items are complete. Staff is working on final invoices.
o Status as of February 15, 2024: Construction is complete. Staff is working on processing final invoices.
o Status as of March 19, 2024: Construction is complete. Contractor is working on submitting a revised final invoice.
o Status as of April 24, 2024: Staff received final project invoice from contractor on April 18, 2024. Staff has reviewed and approved final project invoice. Staff anticipates presenting a staff report to accept project as complete during the month of May 2024. o Status as of May 20, 2024: Staff will present a project closeout staff report to City Council on May 22,2024. Final Invoice to contractor has been processed. o Status as of June 20, 2024: Project was accepted as complete at the May 22, 2024, City Council Meeting. Item No. 25 File ID #2024-0348. Staff is working on processing the retention invoice. Notice of Completion form was recorded with the LA County Recorder’s office on June 18, 2024.
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Retention has been released. Project is closed. o Status as of October 30,2024: Project is closed.
• PW1642: DEL AMO BLVD. STREET IMPROVEMENT
o Location: Del Amo from Central to Wilmington Blvd.
o Description: This project includes concrete reconstruction, tree removal/replacement, asphalt concrete pavement overlay, repair of damaged sidewalks, driveway approaches, curbs and gutters, and access ramps.
o Budget: $2,924,641.10
o Current Phase: PRE-CONSTRUCTION.
▪ Construction expected to start in February 2024
▪ Preconstruction meeting scheduled for January 11, 2024 ▪ Status as of January 22, 2024:80% of the PCC improvements have been completed, including driveways, sidewalks, and curb and gutter installations. ▪ PCC pavement removal and replacement will commence on the week of March 18, 2024.
o Status as of March 18, 2024: Estimated completion date is May 2024 o Status as of April 24, 2023: Contractor is currently working on grinding of the pavement. Final cap of asphalt will be installed by May 9, 2024. Estimated completion date is May 2024.
o Status as of May 21, 2024: Project completed at approximately 90%. The first coat of striping paint was applied today.
o Status as of June 24, 2024: Contractor is working on punch-list items. o Status as of July 25, 2024: Punchlist items have been completed. Awaiting final invoice and CMS boards.
o Status as of August 29, 2024: Project will be presented to City Council as complete on September 17, 2024.
Public Works Department August 2024 Monthly Report
o Status as of September 23 2024: Project will be presented to City Council as complete on October 1st, 2024.
o Status as of October 30 2024: Project has been recorded with the LA County
• PW1655: CARSON ST. REHABILITATION PROJECT
o Location: Carson Street from Recreation Rd. to Santa Fe Ave. o Description: The length of this corridor is 2.2 miles, and the project includes concrete reconstruction, tree removal and replacement, asphalt concrete pavement overlay, repair of damaged sidewalks, driveway approaches, curbs and gutters, and access ramps.
o Budget: $2,799,100.00
o Status: COMPLETION AND CLOSEOUT
▪ Contractor provided response to punch list on May 10, 2023. ▪ The punch list discussions with the contractor are expected to be completed on May 30, 2023.
▪ Contractor provided response to punch list comments on July 10, 2023. ▪ Contractor submitted proposal for pavement repairs on August 16, 2023. ▪ Status as of October 26, 2023: Contractor to provide dates for repairs. ▪ Status as of March 18, 2024: We are currently awaiting the contractor's response to the last email sent on March 5, 2024, regarding the final punch list item.
▪ Status as of April 24, 2024: No update
▪ Status as of May 20, 2024: No update
▪ Status as of July 25, 2024: No update
▪ Status as of August 26, 2024: No update
▪ Status as of September 23, 2024: No update
▪ Status as of October 30, 2024: No update
▪
• PW1686: INSTALLATION OF SAFETY & SECURITY CAMERA
o Location: Avalon Boulevard from Scottsdale to 189th
o Description: Removal and Replacement of a Network Based Safety and Security Camera System and associated work along Avalon Blvd.
o Budget: $200,000.00
o Status: CONTRACT TERMINATION
▪ Staff is working with the City Attorney to terminate contract. o Status as of June 22, 2023: No Update
o Status as of July 19, 2023: Email notice of Contract Termination was sent to Datagear on July 17, 2023. Engineering Division will discuss contract termination processes with City Attorney’s office.
o Status as of November 20, 2023: Bond has been released. Staff is working to process the final invoices.
o Status as of January 3, 2024: One invoice was processed on 12/14/2023. Staff will be working on processing the final invoice for the retention amount. o Status as of January 22, 2024: No update
Public Works Department August 2024 Monthly Report
o Status as of April 24, 2024: No update
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Project terminated/closed.
• PW1687: CARSON ST. INTELLIGENT TRANSPORTATION SYSTEM
o Location: Carson St. from 405 Fwy to Figueroa Street
o Description: The project involves the installation of CCTV cameras and appurtenant hardware at ten (10) intersections along Carson Street, connecting these to existing fiber optic cable, and tying the existing fiber optic cable into City Hall. The project will also include the establishment of a Traffic Management Center in City Hall for the purposes of traffic signal synchronization, traffic management, surveillance, and traffic monitoring. o Budget: $700,000.00
o Status as of November 20, 2023: Reviewing feasibility of qualification-based contractor procurement strategies with Finance.
o Status as of December 29, 2023: Issued solicitation for systems engineering from Engineering On-call consultant list, proposals due 1/4/24. o Status as of January 17, 2024: Received proposals; need to discuss contract options with Purchasing.
o Status as of February 7, 2024: Negotiating contract with consultant. o Status as of March 13, 2024: Received updated proposal from consultant. Task Order to be issued to perform systems engineering.
o Status as of April 18, 2024: Conducted kickoff meeting; conducting field review of existing equipment and fiber optic cable.
o Status as of May 15, 2024: Field work ongoing.
o Status as of June 20, 2024: Consultant met with IT Department at City Hall. Received 60% plans for traffic signal and fiber optic work.
o Status as of July 25, 2024: Reviewing plans.
o Status as of August 26, 2024: No update
• PW1694: PROJECT: BRIDGE MAINTENANCE INSPECTION REPORTS – WORK
RECOMMENDED
o Location: All bridges with an open inspection report
o Description: Complete work recommended items as noted in the bridge inspection reports from Caltrans.
o Status: CONTRACT EXECUTION
▪ Staff will make recommendation to City Council on June 6, 2023, to award contract to Beador Construction Company, Inc. (Staff report 2023-0379) o Status (6/22/2023): Contract was awarded to Beador Construction company at the June 6 City Council meeting. The contract is being executed.
o Status as of July 19, 2023: The contract was executed. Pending purchase order. o Status as of August 17, 2023: Pending purchase order approval. o Status as of September 21, 2023: Staff sent the purchase order to contractor and requested a preliminary baseline schedule. Estimated start date is pending. o Status as of January 3, 2024: No updates
Public Works Department August 2024 Monthly Report
o Status as of January 22,2024: Estimated construction start date is March 2024. Staff is working on construction submittals.
o Status as of February 15, 2024: No Update
o Status as of March 19, 2024: Staff has reviewed the submittals from the contractor. Traffic control submittals have not been submitted by Contractor. o Status as of April 24, 2024: Contractor is working on traffic control submittals. Estimated construction start date is June 2024.
o Status as of May 20, 2024: Staff is applying for encroachment permits to the following agencies: LA County Flood Control District, Caltrans, City of LA, City of Long Beach.
Estimated construction start date is June 2024.
o Status as of June 20, 2024: Staff is finalizing permit applications with the agencies above.
Estimated Start date is August 2024.
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Awaiting permit approval from Caltrans for traffic control encroachment within Caltrans Right of Way. Estimated start date is September 2024. o Status as of October 30,2024: No updat
• PW1701/1715: MEDIAN LANDSCAPE IMPROVEMENTS
o Location: City-wide
o Description: Irrigation upgrades, landscaping upgrades in City medians and streetscapes o Budget: $1,500,000
o Status: PRE-DESIGN
▪ Status as of December 29, 2023: Prepared draft scope for Median Streetscape Plan
▪ Status as of January 17, 2024: Working on receiving proposal by 1/31/24. ▪ Status as of February 7, 2024: Negotiating contract with Consultant. ▪ Status as of March 13, 2024: Received updated proposal from consultant. Task Order to be issued to develop Streetscape Master Plan.
o Status of April 18, 2024: Conducted kickoff meeting and first project design meeting.
Reviewing existing conditions.
o Status as of May 15, 2024: Draft plant palettes developed by consultant. o Status as of June 20, 2024: Three sets of concepts have been submitted by consultant. o Status as of July 25, 2024: One concept for each land use type was selected internally and presented to the Public Works Commission. The consultant is working on the cost estimates and implementation plan.
o Status as of August 26, 2024: Received draft Streetscape Master Plan from consultant.
Staff reviewing to provide comments.
o Status as of September 18, 2024: City Staff to provide feedback to consultant next week.
Streetscape Master Plan anticipated to go to City Council for acceptance 10/15/24. o Status as of October 28, 2024: Consultant presented on draft plan to Planning Commission.
• PW1763: ARPA ROADWAY REHABILITATION PROJECT
o Location: Residential streets throughout the city selected per Pavement Management Program report.
Public Works Department August 2024 Monthly Report
o Description: Roadway rehabilitation with slurry seal method o Budget: $3,500,000.00
o Status: CONSTRUCTION IN PROGRESS
▪ The contractor is scheduled to resume work in June 2023, pending warmer temperatures.
▪ Contractor is working on the new schedule. Anticipating submittal, the week of July 10, 2023.
▪ Contractor resumed with construction activities on July 17, 2023. ▪ Status as of January 22, 2024: Construction was completed in October 2023. ▪ Status as of March 18, 2024: Repairs on streets that were completed during the Winter 2022 will take place in June 2024.
▪ Status as of April 24, 2024: No update
▪ Status as of May 21, 2024: Public Works Right of Way Division has started crack sealing. PMI is scheduled to start on June 3, 2024.
▪ Status as of June 18, 2024: PMI is on the third week of the schedule. Construction is expected to be completed the week of July 1, 2024.
▪ Status as of July 25, 2024: PMI has completed the work and will provide a schedule for the punch list items.
▪ Status as of September 23, 2024: No update
▪ Status as of October 30, 2024: PMI completed initial punch list. New punch list items have been added.
• PW1765: LOMITA BLVD
o Status as of January 3, 2024:
▪ TAIT is sending over 30% of plans for review.
▪ Geotechnical report will be completed by the end of November. ▪ Railway spurs application is $2,000 per spur, Tait is saying these fees will amount to $8,000 for all the Street Improvement projects that the city has. ▪ Plans should be complete by the end of January.
▪ Plan to take to council for approval on the second meeting in February. ▪ Status as of February 15, 2024: Plans are expected to be complete by mid-March. ▪ Status as of March 18, 2024: Plans are expected to be complete by mid-April. ▪ Status as of April 24, 2024: Working with City of Los Angeles for applicable permits.
▪ Status as of May 15, 2024: Meeting set up with the City of Los Angeles to go over permits and project.
▪ Status as of June 24, 2024: Meeting set up with the City of Los Angeles to go over permits and project.
▪ Status as of July 25, 2024: No update
▪ Status as of October 30, 2024: Consultant working on the right of way issues for stormwater easement. Addressing additional Task Order request.
• PW1773: CARSON ACTIVE TRANSPORTATION & COMMUNITY CONNECTIVITY PLAN
Public Works Department August 2024 Monthly Report
o Location: Citywide
o Description: Develop Carson Active Transportation and Community Connectivity Plan. o Budget: $405,000 ($358,000 in Caltrans Sustainable Communities Grant) o Status: PREDESIGN
▪ Contract awarded to Alta Planning + Design, Inc. at the May 2, 2023, City Council Meeting
▪ Project kickoff meeting conducted August 31, 2023.
o Status as of November 21, 2023: Consultant proceeding with existing conditions review and public outreach plan. Website anticipated to be up by January 2024 o Status as of December 29, 2023: Consultant preparing to go live with website, social media, etc. in January.
o Status as of January 17, 2024: Website, social media, etc. are live. First virtual open house is set for 1/25/24.
o Status as of February 7, 2024: Research and analysis is ongoing. In-person open house events planned for February 22, 2024, and April 18, 2024. o Status as of March 13, 2024: In-person open house was held at Anderson Park on February 22, 2024. The final open house is scheduled for April 18, 2024, at Veterans Park. Research and analysis are ongoing.
o Status as of April 18, 2024: Received existing conditions report draft and provided comments. The final open house is scheduled for April 18, 2024, at Veterans Park.
Research and analysis are ongoing.
o Status as of May 21, 2024: Final open house was conducted. Analysis is ongoing.
Planning for fall workshop meetings in progress.
o Status as of June 20, 2024: Walk audit conducted at select schools. Analysis is ongoing.
Planning for fall workshop meetings is ongoing.
o Status as of July 25, 2024: Consultant has begun to prepare draft recommendations, concepts, and cost estimates.
o Status as of August 26, 2024: Staff working with consultant on draft recommendations. o Status as of September 18, 2024: Internal draft document prepared for discussion with management. Public workshops scheduled for November.
o Status as of October 28, 2024: Internal draft document and recommendations reviewed with City Manager’s Office.
• PW1775: 213TH ST. STREET LIGHTS
o Location: East 213th Street between Chico Ave and Wilmington Blvd o Description: Installation of streetlights
o Budget: $800,000
o Status: DESIGN PROCUREMENT
▪ Status as of December 29, 2023: Solicitation issued from Engineering On-call consultant list; 1 proposal received.
▪ Status as of February 7, 2024: Negotiating contract with consultant. ▪ Status as of March 13, 2024: Consultant to send revised scope and fee (final iteration).
▪ Status as of April 18, 2024: Waiting for Task Order and Notice to Proceed (NTP) ▪ Status as of May 21, 2024: Conducted kick-off meeting. ▪ Status as of June 20, 2024: Field work ongoing.
Public Works Department August 2024 Monthly Report
▪ Status as of July 25, 2024: Consultant is preparing plans. ▪ Status as of August 26, 2024: No update
▪ Status as of September 18, 2024: 30% submitted to City. Comments sent. ▪ Status as of October 28, 2024: Consultant coordinating with SCE to develop service request which will require upgrading the circuit on 213th.
• PW1779: WALNUT AVENUE (AVALON TO BILLINGS)
o Status as of January 3, 2024
▪ Webb is working on the 60% plans.
▪ Webb needs to know from the city if they are going with just asphalt or a complete street rebuild.
▪ Webb is finishing up with the plans.
o Status as of March 18, 2024: Going to City Council for April 2, 2024, Meeting. o Status as of April 24, 2024: Project has been ground and overlaid by the other project, working with city staff for upgrades in signing and stripping. Will fill CEQA. o Status as of May 15, 2024: Citywide asphalt project has applied asphalt, working with ROW Superintendent to finalize the sidewalk work, signs, and stripping. Filed CEQA documentation.
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: No update
• PW1780: VICTORIA TRANSIT CENTER
o Location: Victoria Street near Tamcliff Avenue
o Design and construction of a new transit center adjacent to CSUDH. o Budget: $3,525,000
o Status as of November 21, 2023: DESIGN
▪ Task Order 2023-008 issued to Breen for Conceptual Design ▪ Follow-up meetings to be held to discuss incorporating CSUDH, Dignity Health input.
o Status as of December 29, 2023: Awaiting revised concept after 2nd meeting. o Status as of January 17, 2024: No update
o Status as of February 7, 2024: Received revised concepts which are being reviewed by City and CSUDH Staff.
o Status as of March 13, 2024: Revised concepts discussed at February 29, 2024, meeting with consultant and CSUDH. Conceptual design to be finalized later this month.
o Status as of April 18, 2024: Working with CSUDH to coordinate upcoming survey work. o Status as of May 15, 2024: Awaiting Access & Exclusivity Agreement from CSUDH to allow for onsite survey work.
o Status as of June 20, 2024: Working with CSUDH to execute Access Agreement. o Status as of July 25, 2024: Still working to execute agreement. City working to obtain right-of-way documents from CSUDH.
o Status as of August 26, 2024: No update
o Status as of September 18, 2024: Agreement set to go to City Council 10/1/24 for approval.
o Status as of October 28, 2024: Agreement executed, awaiting consultant schedule for survey work.
Public Works Department August 2024 Monthly Report
• PW1785: BICYCLE MASTER PLAN UPDATE
o Location: City-wide
o Description: Update City Bicycle Master Plan
o Budget: $897,000
o Status: PRE-DESIGN
o Status as of December 29, 2023: Working with Caltrans to program allocation request. o Status as of January 17, 2024: No update
o Status as of February 7, 2024: No update
o Status as of March 13, 2024: On CTC March Agenda for allocation o Status as of April 18, 2024: CTC allocated funds for plan update. Program supplement agreement scheduled for the May 21, 2024, City Council Agenda. o Status as of May 20, 2024: No update
o Status as of June 20, 2024: Received approved finance letter from Caltrans. Drafting RFP scope of work.
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: No update
o Status as of September 18, 2024: Drafting project scope. o Status as of October 28, 2024: No update
• PW1753: UNIVERSITY DRIVE STREET IMPROVEMENT – AVALON TO WILMINGTON FEDERAL PROJECT NO. STPL-5403(033)
o Status as of May 20,2024: Request for Authorization for Preliminary Engineering Application was resubmitted to Caltrans on May 16, 2024. Estimated construction start date is June 2025.
o Status as of June 20,2024: Staff resubmitted application on June 17, 2024. Revised application included “Expedited Project Selection Procedures (EPSP)” approval from SCAG.
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Application pending approval from Caltrans. o Status as of October 30,2024: Staff report item #23 was approved at the 10/1 Council Meeting along with resolutions 24-091 & 24-095. Staff routed the supplement agreement through City Clerk on 10/29 for the Mayors signature.
Traffic Signal Improvements
• PW1611: TRAFFIC SIGNAL INSTALLATION AT CENTRAL AVE. & DIMONDALE DR. o Location: Intersection of Central Ave. and Dimondale Dr. o Description: Installation of new Traffic Signal
o Budget: $660,000
o Status: CONSTRUCTION IN PROGRESS
▪ Construction resumed May 22, 2023
o Status as of October 26, 2023: Geotechnical assessment underway to evaluate saturated soil conditions for signal pole foundation.
Public Works Department August 2024 Monthly Report
o Status as of November 20, 2023: Geotech report received. No structural redesign is needed. Directed KOA to provide formal response to RFI with recommendations.
Contractor reviewing response.
o Status as of November 21, 2023: Accepted; Notice of Completion recorded, retention release anticipated next week.
o Status as of January 17, 2024: Work resumed December 27, 2023. Concrete pour of custom foundation complete. Construction is anticipated to be completed in February. o Status as of February 7, 2024: Traffic signal poles in place, SCE provided power. Signal scheduled to be activated on or before 2/19/24. Construction is anticipated to be completed in March.
o Status as of March 13, 2024: Traffic signal operational as of March 8, 2024. Punch list items and LA County review for acceptance of maintenance remaining. o Status as of April 18, 2024: No update
o Status as of May 15, 2024: No update
o Status as of June 20, 2024: Waiting for final signal timing plan from County. o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Approved final timing, waiting for County to implement. o Status as of September 18, 2024: Timing implemented, accepted for maintenance by LA County, project completion going to City Council 10/1/24. o Status as of October 28, 2024: Project completion accepted by City Council on October 1, 2024. Notice of Completion was filed 10/8/24. Contract completion form was signed 10/24/24.
• PW1614: DEL AMO BLVD. AT STAMPS DR. TRAFFIC SIGNAL IMPROVEMENT o Location: Intersection of Del Amo Boulevard and Stamps Dr. o Description: Installation of new Traffic Signal
o Budget: $485,268.95
o Status: CONSTRUCTION IN PROGRESS
▪ Consultant to prepare legal description and exhibit to use for easement. ▪ SCE to execute easement with property owner.
▪ Crosstown to order poles after easement executed and locations verified. o Status as of November 20, 2023: SCE is working on plans to bring power to the intersection. Design engineer is revising plans to incorporate SCE changes. o Status as of December 29, 2023: Property owners do not want to execute easement due to concerns over service location impacting their hardscape and access during construction. Other alternatives being explored.
o Status as of January 17, 2024: Property owners do not want to execute SCE easement.
City to explore alternative of constructing traffic signal along with development of property to the south.
o Status as of February 7, 2024: No update
o Status as of March 13, 2024: No update
o Status as of April 18, 2024: No update
o Status as of May 15, 2024: No update
o Status as of June 20, 2024: No update
Public Works Department August 2024 Monthly Report
o Status as of July 25, 2024: Contract Termination Notice issued to contractor. Project to re- bid after re-design of electrical service and traffic signal. o Status as of August 26, 2024: Reviewing contractor invoices for work completed. o Status as of September 18, 2024: No update
o Status as of October 28, 2024: Equipment received from contractor on 10/22/24.
• PW1647: I-110 FREEWAY ARTERIAL IMPROVEMENTS
o Location: Del Amo Blvd at Vermont Ave; Del Amo Blvd at Figueroa St; Del Amo Blvd at Main St; Hamilton Ave at I-110 SB on/off-ramps; Figueroa St at I-110 NB on/off ramps; Figueroa St at Torrance Blvd; Main St at Torrance Blvd; Carson St at Vermont Ave; Carson St at Figueroa St; and Avalon Blvd at Carson St
o Description: Traffic Signal Improvement at 6 intersections near I-110 /FOLA with Metro Express lanes Net Toll Revenue Reinvestment Grant
o Budget: $3,520,000 = $1,760,000 (Grant Fund) + $1,760,000 (Local Fund) o Status: DESIGN
o Status as of October 26, 2023: Awaiting execution of Funding Agreement for extension and scope modifications.
o Status as of November 20, 2023: Received Metro’s approval of reduced scope of work and time extension.
o Status as of December 29, 2023: Consultant reviewing and updating scope. o Status as of January 17, 2024: No update
o Status as of February 7, 2024: Consultant reviewing relevant traffic studies to refine scope.
o Status as of March 13, 2024: No update
o Status as of April 18, 2024: No update
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: Consultant’s traffic analysis showed that proposed treatments at three of the project intersections will not markedly improve traffic conditions. City to submit request for Scope Modification from Metro to be able to use the funds on different traffic signals and treatments that will have a greater positive impact to traffic.
o Status as of August 26, 2024: Scope modification request sent to Metro; meeting scheduled with Metro in September to discuss.
o Status as of September 18, 2024: Staff preparing additional documents for submission to Metro as requested to supplement scope modification request. o Status as of October 28, 2024: Staff submitted additional information to Metro, as requested. Received consultant proposal for 3 out of the 6 signals to be designed and preparing Task Order.
• PW1649: HSIP H8-07-003 TRAFFIC SIGNAL UPGRADE
o Location: Intersections of Avalon Blvd at Victoria St, Main St at Sepulveda Blvd, Main St at 223rd St, and Figueroa St at Torrance Blvd
o Description: Traffic Signal Upgrades for 4 intersections with HSIP Grant o Budget: $1,912,000 = $1,720,890 (HSIP Fund) + $1,279,110 (Local Fund) o Status: DESIGN
Public Works Department August 2024 Monthly Report
▪ Awaiting final SCE plans
o Status as of November 20, 2023: No update
o Status as of December 29, 2023: No update
o Status as of January 17, 2024: No update
o Status as of February 7, 2024: Received final SCE plans, working with designer to finalize PS&E package.
o Status as of March 13, 2024: Meeting scheduled this month with designer to review PS&E package and outstanding items.
o Status as of April 18, 2024: Additional work on design and Caltrans authorizations will require forthcoming change order.
o Status as of May 15, 2024: Contract amendment for the Consultant is scheduled for June 4, 2024, City Council Agenda for additional design and Caltrans authorization work.
Working with Caltrans to submit necessary forms to authorize construction funding. o Status as of June 20, 2024: Working with Caltrans on necessary forms to authorize construction funding and FHWA review/approval of Carson’s PLA. o Status as of July 25, 2024: No update
o Status as of August 26, 2024: PLA does not apply to Federal-aid projects. Working with consultant to confirm utility investigation complete and finalize plans. o Status as of September 18, 2024: NEPA CE received from Caltrans. Advantec submitted final plans. City performing final review. Anticipated City Council approval date of 10/15/24.
o Status as of October 28, 2024: Notice of Exemption was approved at City Council 10/15/24. Request for Authorization for Construction was submitted to Caltrans 10/24/24.
• PW1657: FOR MR 312.46 AND MR 312.41, TRAFFIC SIGNAL UPGRADES o Location: Figueroa St at Victoria St; Main St at 220th St; Main St at Victoria St. o Main St at Albertoni St; and Figueroa St at 223rd St; and Figueroa Street at 234th St. o Description: Traffic Signal Upgrade at six (6) intersections. The proposed upgrades aim to improve signal coordination and traffic progression to alleviate arterial congestion by installing, replacing and/or updating traffic signal poles, mast arms, signal heads, controllers, cabinets, left turn phasing, CCTVs, countdown pedestrian signal heads, ADA compliant curb ramps and pedestrian push buttons, and traffic signal timing. o Budget: $4,220,000 (Measure R Grant)
o Status: DESIGN AND PERMITTING
▪ Revised funding agreement approved on May 16, 2023, City Council ▪ Awaiting final SCE plans
▪ Status as of November 20, 2023: No update
▪ Status as of December 29, 2023: No update
▪ Status as of January 17, 2024: No update
▪ Status as of February 7, 2024: Received final SCE plans, working with designer to revise PS&E package, Los Angeles City DOT to review location within their right-of-way.
▪ Status as of March 13, 2024: Received final PS&E package for Los Angeles City DOT location, to sign internally and submitted to LADOT for signature.
Designer making final revisions to PS&E package.
Public Works Department August 2024 Monthly Report
▪ Status as of April 18, 2024: LADOT provided approval, but LABOE has not reviewed. Met with LABOE to clarify their approval process for “A Permit”. ▪ Status as of May 15, 2024: LABOE to review plans.
▪ Status as of June 20, 2024: LABOE review continuing.
▪ Status as of July 25, 2024: No update
▪ Status as of August 26, 2024: LABOE reviewed with no further comments.
LABOE issuing permit and final signing of plans.
▪ Status as of September 18, 2024: Staff preparing bid package, awaiting filing of Notice of Exemption.
▪ Status as of October 28, 2024: Waiting for final updates from consultant. IFB planned for November pending budget.
• PW1667: TRAFFIC SIGNAL IMPROVEMENT AT AVALON BLVD. & GARDENA BLVD. o Location: Intersection of Avalon Blvd and Gardena Blvd o Description: Traffic signal upgrade design to include protected left-turn phasing for north- south traffic.
o Budget: $500,000
o Status: DESIGN
▪ Status as of October 26, 2023: Design Consultant to submit 100% PS&E packet.
Status as of November 20, 2023: Designer is obtaining potholing. Designer will submit plans in early December. County is reviewing City’s request to incorporate our design into County’s Avalon TSSP project design.
▪ Status as of January 17, 2024: Design complete. City has accepted package. Sent to County, who will be preparing revised signal design.
▪ Status as of February 7, 2024: County preparing update to design to insert into upcoming City procurement.
o Status as of March 13, 2024: No update
o Status as of April 18, 2024: No update
o Status as of May 20, 2024: No update
o Status as of June 20, 2024: Received County’s revised signal design; comments returned to County for final incorporation.
o Status as of July 25, 2024: No update
o Status of August 26, 2024: Received final plans from County. Reviewing and compiling bid package.
o Status as of September 18, 2024: Staff preparing bid package, awaiting filing of Notice of Exemption
o Status as of October 28, 2024: Notice of exemption filed, IFB anticipated in November pending budget.
• PW1784: CENTRAL AVE. AT UNIVERSITY DR. TRAFFIC SIGNAL IMPROVEMENT o Location: Intersection of Central Avenue and University Drive. o Description: Installation of left turn arrows at existing signalized intersection o Budget: $640,000
o Status: DESIGN
▪ Consultant preparing 60% plans.
Public Works Department August 2024 Monthly Report
▪ Status of August 26, 2024: Consultant submitted 60% plans and City reviewing.
Working through design issues with placement of new signal poles. ▪ Status as of September 18, 2024: City provided 60% comments. Consultant revising plans, 90% anticipated in November.
Summary of All Traffic Signal Projects:
Location/Intersection Construction Start Date Anticipated Construction Completion Date PW 1611 Central Ave & Dimondale Dr MAY 2023 OCTOBER 2024* Avalon Blvd at Carson St In Design TBD
PW 1667-Avalon Blvd at Gardena Blvd MARCH 2025 TBD
PW 1649-Avalon Blvd at Victoria Ave MARCH 2025 TBD
Carson St at Vermont Ave In Design TBD
Carson St at Figueroa St In Design TBD
PW 1736- Carson St. at Wilmington Ave (CIP 24-25 Design) TBD PW 1784- Central Ave at University Dr In Design TBD
Del Amo Blvd at Vermont Ave In Design TBD
PW 1647-Del Amo Blvd at Figueroa St In Design TBD
Del Amo Blvd at Main St In Design TBD
PW 1647 Del Amo Blvd at Hamilton Ave In-Design TBD
PW 1736 Dolores St. at 223rd St. (CIP 24-25 Design)
PW 1647 Hamilton Ave at I-110 SB
On/Off-ramps
In Design TBD
PW 1657-Main St at 220th St MARCH 2025 TBD
PW 1649 -Main St at 223rd St MARCH 2025 TBD
PW 1657-Main St at Albertoni St MARCH 2025 TBD
PW 1649-Main St at Sepulveda Blvd MARCH 2025 TBD
Main St at Torrance Blvd In Design TBD
PW1657-Main St at Victoria St MARCH 2025 TBD
PW 1647-Main St. at I 405 NB On-ramp In Design TBD
PW 1647-Main St. at I 405 NB Off-ramp In Design TBD
PW 1736-Main St. at Carson St. (CIP 24-25 Design) TBD
PW 1657-Figueroa St at 223rd St MARCH 2025 TBD
Figueroa St at 228th St In Design TBD
PW 1657-Figueroa St at 234th St MARCH 2025 TBD
PW 1647-Figueroa St at I-110 NB on/off
ramps
In Design TBD
PW 1649-Figueroa St at Torrance Blvd MARCH 2025 TBD
PW 1657-Figueroa St at Victoria St MARCH 2025 TBD
* Delays due to long-lead items and supply chain issues
Stormwater Improvements
Public Works Department August 2024 Monthly Report
• PW1682: STORMWATER FACILITIES & IMPLEMENTATION PLAN
o Location: Citywide
o Description: Developing a plan to identify potential new stormwater facilities that are needed for compliance with City’s N ational Pollutant Discharge Elimination Systems (NPDES) permit. Ensures that we have clean water in our local waterbodies and helps with climate resiliency through water capture and pre-treatment and reduces our impact on the oceans.
To also update the Enhanced Watershed Management Plan, which is a document tha t is used to maintain compliance with the City’s NPDES permit. This is needed to keep up to date with permits from the State.
o Current Phase: PLAN DEVELOPMENT AND SITE SELECTION
▪ The first project identified is the Stevenson Park Stormwater Capture Facility. The team has already reached out to Los Angeles County Sanitation to perform a sewer area study and is working on getting funding. The team must also gain approval from the Flood Control District before moving forward with an application next fiscal year. We have been informed that applications for future funding may be paused for this year.
▪ The consultant has identified BMPs for the Gardena, Main and Avalon Green Street Improvement task that were added to the amended contract in June. 60% of the design has been completed and the project is pending a geotechnical review. We are negotiating and looking for potential funding to provide surveying and geotechnical work. Design is paused until this can be executed. ▪ Status as of January 22, 2024: The team is conducting outreach to the Mayor in February to help promote understanding and to gain feedback on potential stormwater facilities and compliance with the MS4 permit. They will also reach out to several other officials.
▪ Status as of February 21, 2024: The team is conducting outreach to stakeholders throughout the city to inform them of the Plan. They are also revising several aspects of the scoring to provide a better assessment of possible stormwater facilities.
▪ Status as of March 20, 2024: The consultant is preparing for outreach to City Council members and other stakeholders, outreach materials and content will be reviewed when submitted. The consultant is also planning on completing the Facilities Plan by the end of May.
▪ Status as of April 23, 2024: The consultant is working on finalizing a prioritization of all stormwater BMPs in the coming months.
▪ Status as of May 20, 2024: No update
▪ Status as of June 20, 2024: The consultant expects to submit a completed draft master plan by the end of the month.
▪ Status as of July 25, 2024: No update
▪ Status as of August 26, 2024: The plan has been completed, a workshop will be planned to present the potential projects to City staff and inform feedback on moving forward with any projects.
▪ Status as of October 30, 2024: Workshop has been completed and two projects will be selected for grant funding opportunities
• PW1776 CALAS PARK STORMWATER SUPPLEMENTAL ENVIRONMENTAL PROJECT ▪ Location: Calas Park
Public Works Department August 2024 Monthly Report
▪ Description: Joint project with Los Angeles County Sanitation Districts to construct a stormwater treatment and capture facility. This project will divert water from the storm drain and allow it to be cleaned and/or reused in the park while also improving park facilities.
▪ Current Phase: Request for Proposals to perform design services. ▪ Status as of March 20, 2024: The RFP is out for bid and bids should be received by next month, with a selection in May.
▪ Status as of April 23, 2024: We are on schedule with the RFP . A pre -proposal meeting was conducted with 30 attendees. The bid opening will be in early May with interviews the following week if needed.
▪ Status as of May 20, 2024: No update.
▪ Status as of June 20, 2024: The project is set to be awarded in July and will go on the City Council’s agenda. The company selected is Craftwater Engineering.
▪ Status as of July 25, 2024: No update
▪ Status as of August 26, 2024: Craftwater Engineering has begun pre-design for the project and the contract is in the process of being executed. ▪ Status as of October 30, 2024: Preliminary design has been completed and the project is ready for 30% design to begin, scheduled to be completed in December
• PW1783 DELFORD CULVERT REPLACEMENT
o Location: 22700 Delford Avenue to 174 W 226th Place
o Description: Due to drainage issues and root intrusion found in this culvert, the City is replacing the entire length to prevent flooding at 22700 Delford Avenue. The replacement will be a box culvert that runs underneath private property. o Status as of February 21, 2024: Received plans, to be reviewed and approved before construction.
o Status as of March 20, 2024: Final plans have been approved and the Project is ready to construct. However, the contract is still in the process of execution. Project will begin construction in mid to late April pending contract execution. o Status as of April 23, 2024: The contract has passed insurance requirements and Purchasing is processing the contract so that work may begin. The work will take place in May and residents have been notified of the upcoming construction. o Status as of May 20, 2024: No update
o Status as of June 20, 2024: The project has completed design and insurance requirements. Construction will begin this month and is expected to be completed in August 2024.
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: The pouring of the new culvert has been completed.
Remaining work is accessory and due to be completed in the next month. o Status as of October 30, 2024: Project completed, remaining punchlist items
Bike Lane Projects
• PW1451 & 1452: BIKE LANE INSTALLATION
o Location: Figueroa Street, Main Street, Victoria Street, and Carson Street. University Drive, Avalon Boulevard, Central Avenue, Del Amo Boulevard, and 223rd Street.
Public Works Department August 2024 Monthly Report
o Description: Design and construction of bike lane facilities o Budget: PW1451 = $4,900,000.00; PW1452 = $4,900,000.00 o Current Phase: DESIGN AND PERMITTING
▪ Final design plan review to be completed in January 2024 ▪ Status as of October 26, 2023: Metro Measure M funding awarded and programmed for construction phase.
▪ Status as of November 20, 2023: Working with Metro on funding agreement for Measure M funds.
o Status as of December 29, 2023 : Working with Caltrans Local Assistance to confirm the revised funding plan including Metro funds and City match. o Status as of January 17, 2024: Resubmitted with additional Caltrans requirements. o Status as of February 7, 2024: City performing design review to coordinate with other CIP projects.
o Status as of March 13, 2024: No update
o Status as of April 18, 2024: Consultant updating final plans package to incorporate other City projects, updates to Federal MUTCD.
o Status as of May 15, 2024: LACMTA funding agreements scheduled for the May 22, 2024, City Council Agenda. Working with Caltrans to submit necessary forms to authorize construction funding.
o Status as of June 20, 2024: Working with Caltrans on necessary forms to authorize construction funding and FHWA review/approval of Carson’s PLA. o Status as of July 25, 2024: Meeting tentatively scheduled with Caltrans to discuss delivery options.
o Status of August 26, 2024: Received tentative direction from Caltrans on City’s project delivery and packaging plan. Confirmed that Metro also accepts this approach.
Caltrans is agreeable to converting some Federal-Aid funds to State funds which will reduce the paperwork burden on CIP projects that use the new striping design. Project will be bid in 3 parts: 1) Median modifications and lighting relocation, 2) Federal-Aid signing and striping for projects not already in CIP (also not subject to PLA), and 3) individual signing and striping sheets for CIP projects to be implemented over this fiscal year and the next two (2) fiscal years prior to 2028 Olympics. City is waiting for final confirmation from Caltrans on this plan.
o Status as of September 18, 2024: City awaiting final plans for each of 3 packages.
Anticipated City Council approval date 10/15/24.
o Status as of October 28, 2024: Anticipated City Council approval date 11/19/24.
• PW1490 & 1600: DOMINGUEZ CHANNEL BIKE PATH INSTALLATION PHASES I & II o Location – Phase I: Main Street to Avalon Boulevard
o Location – Phase II: Avalon Boulevard to Carson St.
o Description: Installation of Bike path along Dominguez Channel o Budget: $9,000,000.00 (PW1490); $5,500,000.00 (PW1600) o Current Phase: DESIGN AND PERMITTING
▪ As a result of the redesign to address safety concerns, the City is working with Metro requesting additional funding and a time extension.
▪ Status as of October 26, 2023: Consultant to continue design with modified scope. ▪ Status as of November 20, 2023: Consultant to continue design with modified scope. ▪ Status as of December 29, 2023 : Consultant contract amendment approved, awaiting signed amendment in mail to issue task order.
Public Works Department August 2024 Monthly Report
▪ Status as of January 17, 2024: Awaiting signed task order memo to issue task order Notice to Proceed.
▪ Status as of February 7, 2024: Notice to proceed on Task Order was issued, working with LA County DPW to obtain permit to conduct survey work for design. ▪ Status as of March 13, 2024: LA County DPW permit obtained, survey work to begin this month.
▪ Status as of April 18, 2024: Seeking a meeting with LA County to review geotechnical scope, waiting for communication from LA County as to who is reviewing.
▪ Status of May 15, 2024: Met with LA County to review structural and geotechnical questions, working with LA County Flood District through permit requirements for various subcontractors’ scope of work.
▪ Status as of June 20, 2024: Biological survey to be conducted this month. ▪ Status as of July 25, 2024: Biological survey is complete. Consultant is working on civil plans. Consultant submitted permit for geotechnical borings which is pending LA County review and approval. Conducted coordination meeting with County on Greenway project status, City’s needs from County.
▪ Status of August 26, 2024: Conducted meeting with County to discuss Geotechnical exploratory permit pending LA County review. County should have comments on permit in September.
▪ Status as of September 18, 2024: Continued coordination with County on Greenway parklet plans, permit still pending LA County review and approval. ▪ Status as of October 28, 2024: Geotech field work complete, awaiting soils report for structural and civil design. Continued coordination with County on Greenway parklet plans
• PW1534: ACTIVE TRANSPORTATION PROGRAM – SANTA FE BIKE LANE o Location: Santa Fe Ave and City-wide
o Description: Construct bike lane on Santa Fe Ave; install curb ramps city-wide; install speed feedback signs city-wide; install crosswalks city-wide; install pedestrian push buttons and countdown heads city-wide
o Budget: $3,491,000
o Status: DESIGN
▪ Status as of December 29, 2023: Working with Caltrans to program allocation request.
▪ Status as of January 17, 2024: Resubmitted with additional Caltrans requirements. ▪ Status as of February 7, 2024: No update
▪ Status as of March 13, 2024: On CTC March Agenda for allocation. ▪ Status as of April 18, 2024: CTC allocated funds for plan update. Program supplement agreement scheduled for the May 21, 2024, City Council Meeting Agenda.
▪ Status as of May 20, 2024: No update.
▪ Status as of June 20, 2024: Received approved finance letter from Caltrans for PA&ED phase. City reviewing procurement options for this project to complete design.
▪ Status as of July 25, 2024: No update
Public Works Department August 2024 Monthly Report
▪ Status as of September 18, 2024: Design to be advertised to include curb ramp design, median nose cuts, and other Community-Wide Safety Improvements that were approved in this grant. Project will then be bid as one construction package, which will include already completed Santa Fe Bike Lane design. ▪ Status as of October 28, 2024: No update.
Park Improvements
• PW 1368: CARRIAGE CREST PARK REDEVELOPMENT
o Location: Carriage Crest Park
o Description: Improve site condition of existing park and develop newly acquired 10-acre parcel for new athletic ballfields (baseball & soccer) with a new dog park, installation of all- abilities playground, renovation to existing building, construction of new picnic shelters, concession stand, restroom, and walking path.
o Status: DESIGN
▪ Kick off meeting with designer was conducted in early May to establish project schedule and verify City’s goals & objectives that shall be included in the design. ▪ Funds were appropriated by City Council at the June 6, 2023, meeting for the discrepancy of the design cost due to the incorrect amount at the award of design on February 21, 2023, City Council meeting.
▪ Designer (RJM) completed the land survey of the site. ▪ It was discovered by Leighton Associates, that further soil testing is needed, which is beyond the current scope of work. The extended scope will require a council agenda item to increase costs and amend scope of work.
▪ Staff is still waiting for the fully executed contract to be provided to RJM. The consultant is working in good faith that City will issue a purchase order along with the fully executed contract.
▪ RJM is preparing preliminary concept plans to be reviewed by Community Services for a presentation to Council.
▪ Status as of October 26, 2023: In progress; concept to be presented to Council by P&R.
▪ Status as of November 27, 2023: Designer advised to move forward with the concept design to construction documents design phase. Review of first plan submittals is estimated for December.
▪ Status as of January 22, 2024: Staff (Maintenance Superintendents & Supervisors) reviewed and discussed comments on the 50% design submittal of the improvement plans. Comments were shared and discussed with designer for them to address and include in next submittal (90% Submittal) ▪ Status as of January 22, 2024: Designer discovered a 69” RCP Storm drain system within a 13-ft easement, owned/maintained by LA County Department of Public Works. City must apply to LACDPW which may allow the City to build on/over said drainage system. If not allowed, the approved layout will need to be reconfigured due to the anticipated restrictions by LACDPW. ▪ Status as of March 20, 2024: RJM submitted 90% of construction plans. Staff reviewing designs in detail.
Public Works Department August 2024 Monthly Report
• City staff is waiting for LA County’s directions about the 69” RCP under a 13-ft easement that has proposed improvements on it.
• City staff are waiting for KOA to provide updated traffic study. • City staff are waiting for report from Leighton Consulting to identify soil removal due to contamination.
▪ Status as of April 29, 2024:
• County provided comments for improvements within the easement. They have requested exhibits with details.
• Traffic Study is complete and warrants a new signal for ingress & egress at the new parking lot towards the southeasterly section of the park. • Leighton has unofficially informed that there is minimal soil that is considered contaminated. They are verifying the lab results to determine if removal is necessary based on the low detection results. • Staff provided comments on 90% to designer.
▪ Status as of May 23, 2024:
• Submitted Exhibits per County’s requirements. County added items to submit (beyond previous requirements). Designer preparing additional exhibits and tentatively scheduled to submit to County by end of May (delayed 3 weeks).
• Completion of design is contingent on County’s approval of proposed work over LA County’s Storm Drain easement. LA County’s review is a minimum of five (5) weeks from latest submittal. Estimated response from County is early July.
• The newly estimated design completion is early August. ▪ Status as of June 24, 2024
• Received comments back from LA County regarding encroachment to easement. Designer to address the last set of comments and expecting approval from LA County by early July.
• Additional soil boring is required in the area where the park marquee sign will be placed. Consultant requesting additional compensation since this is beyond the scope of work.
• Staff recently received PO for C-Below for exploration of existing petroleum utilities towards the easterly side of the property. Staff is coordinating work with contractor to be completed by early July. Data will be shared with the consultant to verify any conflicts with proposed improvements. • Staff is working with the designer to complete plans by the third week of July for bid advertising.
▪ Status as of July 25, 2024
• CEQA approved and project PS&E are ready to be advertised. • Invitation for Formal Bids is posted to solicit bids on July 25, 2024. ▪ Status as of August 26, 2024
• A pre-bid meeting was conducted to clearly inform interested bidders of the accelerated schedule and high expectations for the project.
Public Works Department August 2024 Monthly Report
• Several questions were submitted by interested bidders which resulted in a couple addendums. All responses and addendums were provided to the contractor at the appropriate time.
• Bid opening is scheduled for September 4, 2024.
▪ Status as of September 23, 2024
• Bids opened and construction project is recommended to be awarded on the 10/1/24 City Council Mtg.
• If awarded construction is estimated to start early November to have approximately 9 months of construction
▪ Status as of October 30, 2024
• Construction Contract was awarded to Urban Habitat for the amount of $23M. Staff immediately circulated the contract for execution. • A preconstruction meeting is tentatively set for November 6th in anticipation of issuance of the Purchase Order by end of October.
• Staff working closely with designer and building and safety for issuance of grading permit. A SWPPP to be provided by the contractor prior to issuance of Grading Permit. The SWPPP is also required to obtain a WDID from State website, also as part of the grading permit requirements. • Staff is soliciting service from an Environmental Engineering firm to locate an abandoned oilwell. The scope will also involve a leak test and mitigation plans, if necessary.
• PW1515: CARRIAGE CREST PARK STORMWATER CAPTURE-
o Location: Northeast corner of Sepulveda and Figueroa St. o Description: Installation of Stormwater chambers to capture and divert stormwater to Los Angeles County Sanitation District. This water will be used to augment the reclaimed water for regional uses. This type of stormwater project is the first of its kind in California. o Status as of December 21, 2023: CONSTRUCTION IN PROGRESS ▪ Plans sent over to OHL to provide an estimate on field re-grading and sump pumps in the vaults.
▪ OHL gathering materials and authorization to complete Punch List. o Remaining Punch List Items: funds are being added on the November 7th Staff Report. o OHL has the parts at the Yard and is getting ready to start. o Working on scheduling for restarting this project with OHL o Dave Piece doesn’t have the budget for his staff to do inspection ; he is reaching out to Tetra-tech for help with inspection and Project Management. o Working with OHL to sign Amendment No.1
o Status as of April 24, 2024: Terminating contract with OHL for convenience and working with Sanitation District to bring project to functional status. o Status as of May 20, 2024: No update
o Status as of June 24, 2024: Going to council to accept the O&M agreement from the LA County Sanitation District.
o Status as of July 25, 2024: No update
o Status as of October 30, 2024: Los Angeles Sanitation district is working on Punch List items, anticipated completion Mid- December.
• PW 1610: FOISIA PARK DESIGN
Public Works Department August 2024 Monthly Report
o Location: Foisia Park
o Description: Improve site condition of existing park with construction of new stage area, new picnic area, shade structures and new outdoor exercise stations as well as renovations to the athletic ballfields, playground, restrooms, concession building, marquee sign and parking lot
o Status: DESIGN
▪ Kick-off meeting with designer was conducted in early May to establish project schedule and verify City’s goals & objectives that shall be included in the design. ▪ A job walk with staff and designer (ADL) was conducted on June 14, 2023. The job walk clarified and defined the project’s objectives and goals. Community Services Director and Superintendent were in attendance and provided clear information to the designer with components and features that should be considered for the improvements.
▪ ADL is preparing preliminary concept plans to be reviewed by Community Services for a presentation to Council.
o Status as of October 26, 2023: In progress; concept to be presented to Council by P&R. o Status as of November 27, 2023: Designer has been advised to move forward with the concept design to construction documents design phase. Review of 1st plan submittals is estimated for December.
o Status as of January 22, 2024: Staff (Maintenance Superintendents & Supervisors) reviewed and discussed comments on the 50% design submittal of the improvement plans. Comments were shared and discussed with designer for them to address and include in next submittal (90% Submittal)
o Status as of March 20, 2024: Concept plan modified to include artwork near the front of the park.
▪ The designer is also proposing a concept for a front park marquee sign. ▪ 90% of the plans are scheduled to be submitted March 20, 2024. o Status as of April 29, 2024: Staff reviewed 90% of submittal. Designer to provide Estimate & Specifications. Advertise for Construction Bid is estimated to be published in June 2024.
o Status as of May 23, 2024:
▪ The designer recently brought our attention to the replacement of electrical switchgear that has outlived its service life. The estimated lead time for the switchgear is 45 weeks from the time of order. The electrical service to the facility needs to be modified for the new switchgear and brought up to compliance with current SCE standards. A pod-mounted transformer shall be installed near the existing power pole (main power source)
▪ The designer is wrapping up the design and preparing 100%PS&E for advertising tentatively scheduled June 6, 2024.
o Status as of June 24, 2024
▪ Pre-Bid conference will be held on June 18, 2024.
▪ An addendum will be sent to address a few items that need further details. ▪ Bid opening due July 3, 2024.
o Status as of July 25, 2024
▪ Bids were opened on July 8, 2024
Public Works Department August 2024 Monthly Report
▪ Apparent lowest bidder was reviewed and references were checked and was found to be a qualified contractor with a bid of $9.9M. ▪ On July 18, 2024, apparent lowest bidder requested their bid be withdrawn. After further discussions with contractor and a review of public contract code with City Attorney’s office, the contractor is continuing to pursue the withdrawal of their bid.
All details of the bids and withdrawal of bids have been forwarded to the Director of Public Works for direction.
o Status as of August 26, 2024
• After a review of the bids, the lowest responsive responsible bidder was identified. Staff prepared an agenda item to award the construction contract to Environmental Construction Inc (ECI). A week later ECI submitted an official request to withdraw bids. The 2nd lowest bidder was further evaluated and was eventually concluded to be the “lowest responsive responsible” bidder. Staff to present Award of Contract to PUB Construction Inc for $12,757,062 at the September 17, 2024, City Council meeting.
o Status as of September 23, 2024
▪ Project was awarded on the September 17th City Council Mtg to PUB Construction in the amount of $12,757,062. Contracts are routed for signature. Soon after the contract has been approved by City Atty, Mayor and City Clerk, it’ll be routed to finance for issuance of Purchase Order.
▪ Pre Construction mtg will be scheduled soon after PO is issued and followed by start of construction (Notice to Proceed)
▪ Status as of October 30, 2024
• Construction Contract was awarded to PUB Construction for the amount of $12M.
A preconstruction meeting is tentatively set for mid-November in anticipation of issuance of the Purchase Order by early November.
• PW 1636: MILLS PARK DESIGN
o Location: Mills Park
o Description: Improve site condition of existing park with construction of new splash pad, outdoor restroom, and an outdoor full-court basketball area as well as renovations to picnic areas, installation of shade structures, marquee sign and parking lot o Status: AWARD CONTRACT
▪ Six (6) proposals were received in April.
▪ Staff reviewed and evaluated all proposals.
▪ Negotiations and discussion with the potential design consultant will be finalized by the end of May.
▪ Staff to award design contract tentatively scheduled for June 20th Council meeting. ▪ The City Council approved award of Design Services on June 20th CC mtg to David Volz Design (DVD). Contracts have been sent to DVD for execution. ▪ Staff is waiting for fully executed contract along with issuance of purchase order to have the Kick-Off meeting with designer.
Public Works Department August 2024 Monthly Report
o Status as of October 26, 2023: Purchase order issued; Design Kick-Off Meeting conducted on October 24, 2023.
▪ Status as of November 27, 2023: Conducted a Kick-Off meeting with designer to discuss details and expectations for the improvements at the park. ▪ Status as of January 22, 2024: Concept plans were provided by designer. Staff had further comments on the proposed improvements to the building. Staff will be discussing the details with the designer prior to the start of construction plans. ▪ Status as of March 20, 2024: Designer has provided a 4th version of the concept. This will be the concept they will use to start preparing for construction plans. There’s a high probability that additional scope and cost will be requested by the designer due to the scope of work being broadened.
o Status as of April 29, 2024: Designer started construction plans soon after approval of concept plans. 50% plan submittal is estimated to be received in early May. o Status as of May 23, 2024: Designer provided 60% submittal. Staff is slightly delayed with its internal design review (two weeks)
o Status as of June 24, 2024
▪ Design of building expansion is estimated to be completed by December 2024. ▪ Completion of site improvements will be ahead of the building expansion. ▪ Staff is working with the designer to phase out construction in two stages. ▪ A separate scope will be provided to the architect for the expansion of the building. o Status as of July 25, 2024
▪ Concept design for façade improvements of the building were received and shared with Parks staff for review and comments.
▪ Site plan improvements 100% PS&E are in its final stage and scheduled to be advertised for bids (IFB) by early August.
o Status as of August 26, 2024
▪ Mills Park Project has been divided into two separate projects. Building Renovation Improvements will be assigned a different project number from Site Improvements Project No. 1636.
▪ Site improvement was advertised on August 8, 2024.
▪ Prebid meeting was held on August 14, 2024.
▪ Several questions were submitted by interested bidders which resulted in a couple addendums. All responses and addendums were provided to the contractor at the appropriate time.
▪ Bid opening is scheduled for September 4, 2024.
▪ Status as of September 23, 2024
• Bids opened and construction project is recommended to be awarded on the 10/1/24 City Council Mtg.
• If awarded construction is estimated to start early November to have approximately 6 months of construction
▪ Status as of October 30, 2024
• Construction Contract was awarded to MBC Enterprises for the amount of $3M. Staff immediately circulated the contract for execution. • A preconstruction meeting will be scheduled once release of PO has been determined.
Public Works Department August 2024 Monthly Report
• PROJECT NO. XXX: MILLS PARK BLDG RENOVATION
o Status as of Aug 26, 2024
▪ Staff to generate a new project number for this CIP.
▪ A few façade concepts were presented and discussed with Parks & Recreation. Along with the façade concepts, a few different floor plans were presented and reviewed.
▪ After a few iterations of the interior floor plan and exterior facade, P&R provided approval on August 5, 2024. Designer is currently working on construction plans & specifications based on the approved concepts. o Status as of October 30, 2024
▪ Consultant has provided 90% submittal. Staff will review for final revisions and package plans/specs for bidding.
• PROJECT NO. 1718: JAMES ANDERSON PARK
o Location: 19101 S. Wilmington Ave.
o Description: Accessibility upgrades that include replacing the concrete slab in front of the existing building and new asphalt paving/markings at the accessibility parking stalls. o Status: CONTRACTOR PROCUREMENT
▪ City received five (5) bids on May 18, 2023; apparent low bidder came in at $1,688,094.25.
o Status as of November 27, 2023: Staff is waiting for fully executed contract along with issuance of purchase order to have the Kick-Off meeting with designer. o Status as of January 22, 2024: Staff is waiting for issuance of Purchase Order prior to start of construction.
o Status as of March 20, 2024: Purchase Order was issued, and staff immediately started coordinating start of construction with contractor. A start date was tentatively set for March 25th. But due to conflicting reservations at Anderson Park, Parks & Rec personnel ordered to halt construction until after Jazz Festival (October). o Status as of April 29, 2024: Pre-Construction meeting was held on April 3, 2024, followed with a jobsite meeting the week after.
▪ Contractor placed fencing around the site week of April 29, 2024, to start mobilization of equipment and materials and be prepared for construction the following week.
o Status as of May 23, 2024:
▪ Construction has started. The contractor began demolition of affected concrete walkways per plan. Estimates from the contractor have been requested for the additional scope requested by Parks & Recreation staff. Additional funds for construction may be necessary to accommodate the added scope as well as items not accounted for in the original design.
o Status as of June 24, 2024
▪ Several design discrepancies are being addressed with the designer. Additionally, we are working with the city’s Public Works maintenance crews to handle some of Public Works Department August 2024 Monthly Report
the demolition, instead of the contractor, to avoid issuing change orders and exhausting the contingency.
o Status as of July 25, 2024
▪ Staff continue to work through several design discrepancies. ▪ Approximately 300-ft of rails must be purchased because it was not part of the original scope for the contractor. Staff is soliciting quotes from various fabricators but are having difficulties finding interested vendors to provide a quote or fabricate the rails. Fabricators are expecting detailed drawings of the rails showing angles, turns, heights and depths. Staff is preparing detailed accurate cut sheet drawings to get accurate quotes.
▪ The City’s Concrete crew has been helping with several portions of the concrete work to avoid additional change orders stemming from design deficiencies. ▪ The City’s Irrigation crew has been helping with several irrigation adjustments to avoid additional change orders stemming from design deficiencies. ▪ The Contractor has poured most of the concrete work. There are three (3) remaining locations scheduled to be poured by mid-August. Minor grading and clean up to follow.
▪ Staff’s attempt to find resolution to a big design discrepancy of a five (5) foot grade difference is on-going. Discussions for more grading with current contractors are in motion, which may add to the cost due to additional work. o Status as of August 26, 2024
▪ The contractor has substantially completed contract items. Only remaining item is installation of handrails. First set of handrails were delivered by the contractor on August 22, 2024, and adjustments are needed. Contractor is scheduled to come back early September for installation.
▪ Another set of rails, which were not part of contractor’s scope had to be ordered separately by City staff. Rail drawing details were provided to the fabricator with instructions to accelerate production time. All rails (approx. 300-lf) are expected to be completed by mid-September. Soon thereafter, city crews will install and paint the railing.
o Status as of September 23, 2024
▪ Contractor will be complete installing rails the week of September 23, which is the last items to consider their work complete
▪ City crews will be installing last rail the week of September 23rd, and will be painted before the weekend.
▪ Fence around the perimeter of the park will be removed September 27th. o Status as of October 30, 2024
▪ Contractor has completed all the construction.
▪ Contractor’s request for additional compensation for increased wages was declined by CAO. Contractor has stated to file a claim. ▪ Staff preparing project close-out
* On-going and maintenance related efforts at the Parks are also included within other categories below depending on the project management and type of work.
Public Works Department August 2024 Monthly Report
Building Improvements
• PW1632: COMMUNITY CENTER COILING WALL
o Location: Carson Community Center – 801 Carson St.
o Description: Removal and replacement of existing coiling wall at Community Center Hall A, B, and C. Renovations shall include, at a minimum upgrade to bring the facilities up to current standards and applicable California Building Code (CBC) standards. The project also includes upgrades to the existing lighting and sound system in Hall A, B, and C. o Budget: $1,700,000.00
o Status as of December 21, 2023: CONTRACTOR PROCUREMENT ▪ Bids Came in at $3,450,000, evaluating bids.
▪ One option is to do a reduced scope to only include the walls. ▪ Going to City Council on January 9, 2024.
o Status as of February 15, 2024: In conversation with the architect to divide the project into two.
o Status as of March 18, 2024: New task order being sent out to divide project into two. o Status as of April 24, 2024: No update
o Status as of May 15, 2024: BOA has submitted a proposal for the work. o Status as of June 24, 2024: BOA has submitted plans to Building and Safety for review, BOA has received comments back from Building and Safety and is addressing. o Status as of July 25, 2024: No update
o Status as of October 30, 2024: Caltec is addressing submital comments and issued a request for Substitution, plan to be completed with Project June 2, 2025
• PW1662: NEW AIR FILTRATION & HVAC SYSTEMS AT CITY HALL & COMMUNITY CENTER
o Location: City Hall and Community Center
o Description: Design-built contract to replace and/or upgrade HVAC, controls, roof at City Hall and Community Center.
o Budget: $6,546,676.00
o Status: COMPLETION AND CLOSEOUT
▪ Contractor has submitted mechanical punch list response on 5/23. ▪ Staff expects the contractor to finalize all items by August 2023. ▪ Once punch list items are completed and final invoice is paid, staff will make a recommendation to City Council to accept the project as complete. ▪ Status as of October 26, 2023: Commissioning and punch list are pending new proposal from ALM.
▪ Status as of March 2024: Currently, both the contractor and city staff are working to finalize punch list items in an acceptable manner.
▪ Status as of April 24, 2024: No update
▪ Status as of May 20, 2024: No update
▪ Status as of July 25, 2024: Waiting on the contractor to provide a schedule for the repair of one AHU motor. Commissioning initial report received on July 25, 2024. ▪ Status as of August 26, 2024: No update
▪ Status as of October 30, 2024: Contractor working with B&S to close out the permit.
Public Works Department August 2024 Monthly Report
• PW1693: ELECTRIC VEHICLE CHARGING INFRASTRUCTURE (SCE CHARGE
READY PROGRAM)
o Location: 10 City Parks and Corporate Yard
o Description: Install 126 EV Chargers in City Parks and at the Corporate Yard o Budget: City staff labor to Project Manage, but no capital fund costs to City o Current Phase: DESIGN / PLAN CHECK
o Status as of June 22, 2023: Staff is reviewing easement documents and exhibits. o Status as of July 19, 2023: No Update
o Status as of August 17, 2023: No Update
o Status as of September 21, 2023: Plans have been approved by Building and Safety for Veterans Park, Dominguez Park, Carriage Crest Park, and Carson Park. o Status as of November 20, 2023: Staff has reviewed all easement documents, conveyance letters and plans received to date.
o Status as of January 3, 2024: No update
o Status as of January 22, 2024: No update
o Status as of February 15, 2024: No Update
o Status as of March 19, 2024: No Update. Staff reviewed all plans and easement documents to date.
o Status as of April 24, 2024: Staff participated in the pre-construction meeting for Veterans Park on April 23, 2024. Veterans Park construction is expected to begin on April 29, 2024, or May 6, 2024.
o Status as of May 20, 2024: No update
o Status as of August 26, 2024: No update
Electric Vehicle Charging
Infrastructure Location
Construction Start Date Anticipated Construction
Completion Date
Veterans Park Plan Review TBD
Dominguez Park Plan Review TBD
Anderson Park Submitted to Plan Check TBD
Corporate Yard 1 Plan Review TBD
Corporate Yard 2 In Design TBD
Carriage Crest Park Plan Review TBD
Carson Park Plan Review TBD
Dolphin Park Plan Review TBD
Stevens Park Plan Review TBD
Hemmingway Park Plan Review TBD
Hemmingway Aquatic Center Plan Review TBD
• PW1720: ELEVATORS AT CITY HALL AND COMMUNITY CENTER
o Location: City-Hall and Community Center
o Description: Refurbish and Modernize Elevators at the Community Center and City Hall due to end-of-service life and maintainability. Elevators will be out of service during the active repair work for a duration of less than three months. o Status: CONSTRUCTION IN PROGRESS
Public Works Department August 2024 Monthly Report
▪ Contracts for construction are being routed for signatures. ▪ Working with vendors to meet the insurance requirements. ▪ Status as of October 26, 2023: Plans were approved by Building and Safety on 7/28/23. Staff is preparing bid documents and is planning to advertise project by November 2023.
o Status as of April 24, 2024: No update
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: No update
• PW 1726/1727: COMMUNITY CENTER COURTYARD & EAST PARKING LOT o Location: Community Event Center
o Description: Construction of Courtyard, outdoor amphitheater stage, wedding venues and installation of shade structures.
o Status: DESIGN
▪ Kick off meeting with the designer was conducted in early May to establish project schedule and verify City’s goals & objectives that shall be included in the design. ▪ A job walk with staff and designer (ADL) was conducted on June 6, 2023. The job walk clarified and defined the project’s objectives and goals. Community Services Superintendent and Supervisor were very informative to the designer with components and features that should be considered for the improvements. ▪ ADL is preparing preliminary concept plans to be reviewed by Community Services for a presentation to Council.
▪ Status as of November 27, 2023: Designer has been advised to move forward with the concept design to construction documents design phase. Review of 1st plan submittals is estimated for December.
▪ Status as of January 22, 2024: Staff (Maintenance Superintendents & Supervisors) reviewed and discussed comments on the 50% design submittal of the improvement plans. Comments were shared and discussed with designer for them to address and include in next submittal (90% Submittal) ▪ Status as of March 20, 2024: 90% of the Plans were submitted and currently in review by Engineering, Maintenance, Building and Safety and Planning. ▪ Status as of April 29, 2024:
• Staff returned 90% back to designer. The plans were missing information and staff deemed it to be at 60% level rather than 90% completion. • The designer is expected to resubmit in early May.
• Project is estimated to advertise for bidding around mid-June. ▪ Status as of May 20, 2024: No update
▪ Status as of July 25, 2024: Bids are due to open on July 30, 2024. ▪ Status as of August 26, 2024
• Bids opened on July 30, 2024, and the apparent lowest bidder withdrew bids a week later bid opening. The 2nd lowest bidder (PCN3) was deemed responsive and responsible bidder with an amount of $9,989,558.
Public Works Department August 2024 Monthly Report
• The award of construction contract is scheduled for September 17, 2024, City Council Meeting.
o Status as of September 23, 2024
▪ Project was awarded on the September 17th City Council Mtg to PCN3 Construction in the amount of $9,989,558. Contracts are routed for signature.
Soonafter the contract has been approved by City Atty, Mayor and City Clerk, it’ll be routed to finance for issuance of Purchase Order.
▪ Pre Construction mtg will be scheduled soon after PO is issued and followed by start of construction (Notice to Proceed)
o Status as of October 30, 2024
▪ The Preconstruction mtg was conducted and contractor was issued a NTP effective Oct 28th.
▪ Contractor started to place fence around the perimeter of the work zone and have moved in the work trailer at the southerly end of the community center. ▪ Project team have been reviewing various submittals provided by the contractor. ▪ Application for WDID have been submitted to the State’s website awaiting for issuance.
• PROJECT: Tesla Chargers at Community Center East Parking Lot o Location: City of Carson Community Center East Parking Lot adjacent to Desford St/Bonita St.
o Description: Installation of 20 charging stations
o Status: PLAN CHECK
▪ Tesla is going through the plan check process. Electrical plan check has not been approved by Building and Safety. Approval of electrical design is pending a “SCE fault current” letter.
o Status as of June 22, 2023: No Update
o Status as of July 19, 2023: Tesla has not submitted the easement description or exhibit. o Status as of August 17, 2023: No Update
o Status as of November 20, 2023: Pending easement from SCE. o Status as of January 3, 2024: Staff has finalized the review of SCE easement exhibits. o Status as of January 22, 2024: No update.
o Status as of February 15, 2024: No update.
o Status as of March 19, 2024: No Update
o Status as of April 24, 2024: No update
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: No update
• PROJECT 1730: MSRC – 3 EV Charging Stations at Community Center o Location: City of Carson Community Center Parking Lot Adjacent to Accessible Parking Stalls
o Description: Installation of three (3) EV level 2 charging stations o Status: PLAN CHECK
▪ Preliminary design plans were completed on May 5, 2023. Plans were submitted to Building and Safety for review and approval on May 18, 2023. o Status as of June 22, 2023: No Update
Public Works Department August 2024 Monthly Report
o Status of July 19, 2023: Plans are being reviewed by building and safety for accessibility requirements. An electrical permit is not needed.
o Status as of September 21, 2023: Plans were approved by Building and Safety on 7/28/2023. Staff is working on technical provisions and other related bid documents to release bid packet.
o Status as of November 20, 2023: Staff will present Staff Report 2023-0883 at the December 5, 2023, City Council Meeting to award a construction contract to Alfaro Communications Construction, Inc. Estimated construction start date is March 2024. o Status as of January 3, 2024: Staff report 2023-0883, to award a construction contract to Alfaro, is proposed for the January 9, 2024, City Council Meeting. o Status as of January 22,2024: Staff is working on contract execution. o Status as of February 15, 2024: Contractor is working on revising their certificate of insurance to conform to the project requirements. Contract has not been executed. o Estimated construction start date is March 2024.
o Status as of March 19, 2024: Staff is reviewing submittals. Estimated construction start date is April 2024.
o Status as of April 24, 2024: No update
o Status as of May 20, 2024: Estimated construction start date is June 2024. The staff is working with the design consultant on re-submitting addendum plans to the Building and Safety department.
o Status as of June 20, 2024: Preconstruction meeting held on June 20,2024. Estimated start is in July 2024. Estimated completion is in August 2024. o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Charging stations have been powered up. First row of parking will need to be resurfaced to comply with ADA requirements of a max 2% slope at all accessible parking stalls. Staff is working with the contractor to activate charging stations and complete the site validation process. Pending work includes asphalt pavement resurfacing, striping, signs, handrails, charging station activation and stie validation, and electrical and ADA inspection from Building and Safety. o Status as of October 30,2024: Contractor will finalize the parking striping on 10/31/2024. Estimated completion date is November 2024.
• PROJECT: UNDERGROUND STORAGE TANK PROJECT
o Location: City Hall
o Description: Repairing the underground fuel storage tank due to secondary pipe being cracked. The backup generator remains operational and main fuel pipe remains in good working condition.
o Status: CONSTRUCTION IN PROGRESS
▪ New fuel has been installed in the fuel tank, the fuel pump on the day tank needs to be repaired before Cummings can finalize the repairs. o Status as of April 24, 2024: No update. Estimated construction start date is June 2024. o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: No update
• PW1786: CITY HALL RESTROOM AND KITCHENETTE UPGRADES
o Status as of May 20,2024: Material palette for all restrooms and City Council break room was selected on 5/14/2024. Estimated accelerated project schedule is as follows:
▪ 100% Construction Drawings June 2024
Public Works Department August 2024 Monthly Report
▪ Submit to Building and Safety for Plan Check June 2024 ▪ Advertise July 2024
▪ Award Construction Contract August 2024
▪ Execute Contract and Issue Purchase Order August 2024 ▪ Preconstruction and Material Order August 2024
▪ Relocate Staff August 2024
▪ Start Construction (2nd Floor and Council Area) September 2024 o Status as of June 20,2024: Plans were submitted to Building and Safety on June 12,2024.
Restroom floor plans for the North, East, and South wing need to be revised to accommodate door clearance requirements.
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Staff will present Staff Report with File ID #2024-0708 at the September 17, 2024, City Council Meeting to award a construction contract to Caltec Corporation. Estimate construction start date is October 2024. o Status as of October 30,2024: Contractor started construction on 10/30/2024.
Estimated completion date is March 2025.
• PW1787: CITY HALL 2ND FLOOR CARPET UPGRADES
• Status as of May 20,2024: Staff is proposing to advertise project in August,2024. Construction will start after Project No. 1786; second floor scope of work has been completed. o Status as of June 20,2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: Staff will present Staff Report with File ID #2024-0746 at the September 17, 2024, City Council Meeting to award a construction contract to Rod-West Floor Covering LLC. Estimated construction start date is October 2024. o Status as of October 30,2024: Contractor to start resurfacing the concrete bands in November 2024 and the carpet replacement in December 2024.
OPERATIONS AND MAINTENANCE DIVISION
The Operations and Maintenance (O&M) Division is the second half of Public Works' Operations at the Corporate Yard. Th is Division is responsible for maintaining infrastructure within the public right -of-way (ROW) to ensure public safety. Additionally, th e O&M Division is responsible for environmental and hazardous waste clean-up, signage, pavement markings, striping, streets – asphalt & concrete, sidewalk sweeping, materials abatement, and construction. O&M also works with solid waste management including demolition and waste diversion, used oil collection, solid and organic waste, and streetlight maintenance/signal light malfunctions, electronic & beverage container recycling management. The assets of the Division include warehouse inventory, fleet vehicles, and heavy equi pment. O&M also provides landscaping by tree trimming, ROW maintenance, median maintenance, and parkway trees. These services enable the safe use of public spaces, enhance the cleanliness of the city, and provide greenery to increase the beautification of the public ROW.
• PROJECT: CONCRETE GRINDING
Public Works Department August 2024 Monthly Report
o Location: Citywide
o Description: The project involves grinding sidewalks and pathways identified as requiring grinding due to uplifting or posing a hazard to pedestrians. o Budget: $700,000
o Status: CONSTRUCTION IN PROGRESS
▪ On-going through June 2024
▪ Over 3700 sidewalk tripping hazards have been resolved. o Status as of January 22, 2024: Contract awarded to Precision Concrete o Meeting with Precision took place on May 20, 2024, to discuss work order/service requests (backlog) throughout the city to create a priority list. o Sidewalk cutting completed 0n June 30, 1924
• Status as of August 26, 2024: A new list of locations will be provided to Precision Concrete on August 29, 2024, for sidewalk cutting/grinding for safe pedestrian travel. • Status Update as of September 2, 2024: In-house staff will be grinding sidewalk lifts per maintenance zones 1-7 as needed to eliminate sidewalk hazards immediately.
PROJECT: ANNUAL CITYWIDE PAVEMENT MAINTENANCE
o Status Update as of July 18, 2024: IFB has been re-advertised and opened bids to achieve efficiencies, as this type of paving simultaneously in all districts was the first of its kind. o Status as of August 12, 2024: All American Asphalt was the lowest, responsible bidder in all districts 1,2,3 and 4.
o Status as of October 1, 2024: Four paving phases have been completed. o Status as of October 15, 2024: Award of contract (consideration) Goes to City Council to All American Asphalt anticipated for 11/6/24 City Council Meeting. o Phase five anticipated to start Mid-December 2024, weather permitting.
• PROJECT: ANNUAL CITYWIDE CONCRETE MAINTENANCE
o Status as of May 20, 2024 : Contractor assigned a list of (backlog) priority locations to complete throughout the city.
o Status as of June 20, 2024: Contractor is working through the backlog priority locations. o Status as of July 25, 2024: Preparing list of backlog locations in Districts Three (3) and Four (4) for contractor to be assigned on August 1, 2024.
o Status as of August 26, 2024: Contractor completed previous list of locations on July 30, 2024. A new list of locations for CJ Concrete is being compiled to be sent on August 29, 2024; work is anticipated to start within two weeks from that date. o Status update as of Oct 10, 2024: List of locations completed in districts 1,2,3 and 4. o A list of new locations in districts 1, 2, 3 and 4 of (backlog) service request/work orders will be assigned to CJ Concrete anticipated for Mid-November 2024.
• ENVIRONMENTAL SERVICES
o Perform weekly patrol to identify and coordinate removal of illegal dumping, hazardous waste, and proper removal for bulky items.
o Monitoring construction & demolition projects for residents & businesses o Monitoring of median maintenance contractor citywide; provide maintenance direc tions as needed.
Public Works Department August 2024 Monthly Report
o Monitoring of abatement contractor and assign weed, debris, graffiti, and trash abatement citywide.
o Monitoring of street sweeping contractor.
• MAINTENANCE: CONCRETE & ASPHALT
o Location: Citywide
o Description: Monthly summary of work performed by City maintenance crews who regularly inspect the City’s infrastructure and performing preventative maintenance to ensure safe and cost-effective operations
o Status as of April 24, 2024:
▪ Aggregate base and pavement maintenance are being performed on Lomita Boulevard.
▪ In preparation of the upcoming scheduled slurry seal projects , the team is doing asphalt patching and crack sealing in the designated locations. o Status as of May 20, 2024
▪ Pavement maintenance being performed on Lomita Boulevard ▪ Preparation of the upcoming scheduled slurry seal p rojects, in June, the team is doing asphalt patching and crack sealing in the designated locations. o Status as of July 25, 2024
▪ The team has completed the slurry sealing projects along with asphalt patching and crack sealing in designated locations. Special concrete projects have been undertaken by our team at Anderson and Carson Parks.
o Status as of Sept. 30, 2024
▪ Pavement maintenance is being performed on Lomita Boulevard, ongoing maintenance and monitoring until CIP project takes place in 2025. ▪ Preparation of the upcoming scheduled slurry seal projects, the team is doing asphalt patching and crack sealing in the designated locations. Update: All slurry seal preparation tasks were completed mid–July 2024.
▪ Our team continues to work on special concrete projects still in progress at Anderson Park – assignments completed October 10, 2024.
• MAINTENANCE: SIGNING & STRIPING
o Location: Citywide
o Description: Monthly summary of work performed by City maintenance crews who regularly inspect the City’s infrastructure and perform preventative maintenance to ensure safe and cost-effective operations.
o Status as of October 2024:
▪ Traffic sign asset management underway (over 5,000 traffic signs) on the main arterial streets throughout the city . Replacements, upgrades per CA-MUTCD and repairs.
o Status as of May 20, 2024:
▪ Curb painting maintenance citywide.
▪ Fabricate and install new traffic signs per approved engineered traffic plans at various locations.
▪ ONGOING-Sign Shop -Fabricate traffic signs per California -Manual on Uniform Traffic Control Devices (CA-MUTCD) to replace deteriorated or obsolete signs that have surpassed their life expectancy and no longer have the proper reflectivity per MUTCD standards.
▪ Prepare for annual (in-house) citywide restriping to start by Mid-Nov. to early Dec. 2024 weather permitting.
o Status as of July 25, 2024
▪ Layout and re-striping of newly slurry sealed streets city-wide.
Public Works Department August 2024 Monthly Report
o Status as of August 26, 2024
▪ Traffic signs & pavement marking maintenance citywide per maintenance zones one (1) through seven (7).
▪ Fabricate and install new traffic signs per work orders from city engineering division and service requests from the public regarding damaged and missing signage.
• TREE MAINTENANCE: TRIMMING CITYWIDE
o City contract for tree maintenance is scheduled to expire in the Fall of 2024. Staff is gathering information to create an RFP.
o In-house tree crew working on (backlog) work order /service requests in all maintenance zones (1 – 7).
o In-house tree crew maintaining newly planted trees according to tree watering route. o West Coast Arborist (city contractor) is currently working on the maintenance tree route. o Status as of late July 2024: Special tree planting projects started at Carson Park o Status as of August 26, 2024: Special tree planting were completed as scheduled.
FLEET AND FACILITIES MAINTENANCE DIVISION
The Fleet & Facilities Maintenance Division is the second half of Public Works’ operations at the Corporate Yard. It is responsible for the maintenance and repair of the municipal and park facilities in addition to the City’s fleet vehicles and heavy equipment. These services enhance the cleanliness of the city, enable the safe use of public spaces, and provide greenery to increase the beautification of the city.
• PW1640: PARK PLAYGROUND RUBBERIZED SURFACE REPLACEMENT o Location: All Parks that have rubberized play surfaces. Dolphin Park excluded. o Description: Replace the damaged and worn - out rubberized play surface at all parks o Status: ON HOLD
▪ City staff have used all available material and are preparing a Purchase Order for additional materials to continue repair work.
o Status as of July 25, 2024: ON GOING
o Status as of August 26, 2024: ON GOING
▪ City staff continues to patch deteriorated areas at playgrounds city wide.
• PW1712: PARK HVAC SYSTEMS
o Location: All Parks
o Description: Assess and replace over 50 HVAC units that are past their useful and serviceable life at all 12 park facilities. Design and install brand new HVAC at Veterans Park and Gym.
o Status: Anderson Park, Dolphin Park Office, Foisia Park Office have been completed. o Current Phase: PROJECT ONGOING
o Status as of February 21, 2024: No update
o Status as of April 24, 2024: No update
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: New package units have been procured.
Public Works Department August 2024 Monthly Report
• PW1416: CALAS & FOISIA PARK RE-ROOFING
o Location: Calas & Foisia Park
o Description: Repair the roof at both snack bar and main office due to leaking roof. o Current Phase: Construction at Calas Park is Complete; Pre-procurement for Foisia Park o Status as of October 26, 2023: PROJECT COMPLETE
o PREPARING FORMAL PROJECT CLOSEOUT
o Status as of February 21, 2024: PROJECT CLOSEOUT
o Status as of April 24, 2024: No update
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: No update
• PROJECT: SECURITY WALKING LIGHTS
o Location: Various parks and facilities Citywide
o Description: Repair of the damaged light poles at various parks o Status: COORDINATING
▪ Coordinating with Community Services staff to determine desired lighting style. ▪ Status as of April 24, 2024: No update
▪ Status as of July 25, 2024: No update
▪ Status as of August 26, 2024: No update
• PROJECT 1630: ELECTRICAL PANEL UPGRADE
o Location: Anderson Park
o Description: Install new electrical panel and switch gear o Status as of September 21, 2023: Staff soliciting proposals. o Status as of February 21, 2024: Three proposals received. o Status as of March 18, 2024 : Going to City Council Meeting on May 7, 2024, to award contract.
o Status as of April 24, 2024: City Attorney’s Office is drafting contract. o Status as of May 20, 2024: Currently being advertised in four trade journals per City Attorney’s direction.
o Status as of June 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: In procurement
• BUILDING MAINTENANCE-BUILDINGS/CUSTODIAL
o Status as of February 21, 2024: YTD Completed Work Orders=317 o Status as of March 18, 2024: YTD Completed Work Orders=571 o Status as of April 24, 2024: YTD Completed Work Orders=818 o Status as of May 20, 2024: YTD Completed Work Orders=1063 o Status as of June 20, 2024: YTD Completed Work Orders=1163 o Status as of July 25, 2024: YTD Completed Work Orders=1320 o Status as of August 26, 2024: YTD Completed Work Orders=1487
• CITY HALL ROOF REPAIRS
o Location: City Hall
o Description: Replace 800 ft of coping cap around perimeter of building. o Status as of August 26, 2024: In procurement
• DEL AMO PARK, BLOCK WALL REPAIR
o Location: Del Amo Park
o Description; Repair block wall along western property line Public Works Department August 2024 Monthly Report
o Status as of August 26, 2024: In procurement
ITS CAPITAL PROJECTS
October 2024
1. WIFI IN PARKS
Description: WiFi Internet access at all City facilities to increase public safety, education, programs, and events.
Contract: Datagear
Term: 3 year maintenance
Budget: $420,272 ($350,000 [ARPA] + 70,272)
Current Spend: $286,373.60 (68.14%)
Project Start: May 15, 2023
Project Complete: March 18, 2024
Status: COMPLETED
Notice of termination issued to vendor on December 4, 2023.
Replacement vendor completed remaining (5) parks on March 18, 2024. • Mills Park 100%
• Carson Park 100%
• Veterans Park 100%
• Foisia Park 100%
• Stevenson Park 100%
• Anderson Park 100%
• Dominguez Park 100%
• Del Amo Park 100%
• Calas Park 100%
• Hemingway Park 100%
• Dolphin Park 100%
• Carriage Crest Park 100%
2. TYLER UPGRADE / ENERGOV IMPLEMENTATION
Description: Upgrade Tyler Munis to latest version, enable Cloud access, and add inventory module. Implement new p lanning, permitting , licensing, asset management, and citizen request software platform Energov.
Contract: Tyler Munis/Integrated Technology Partners
Term: 6 years
Budget: 1.3M [ARPA]
Current Spend: $921,965 incurred to date (71%)
Project Start: September 30, 2022
ETA: December 31, 2024
Status: ON SCHEDULE
• Employee Access Module complete, In Production
• EP&L Planning Module Setup complete, In Production
• EP&L Permitting Module Setup complete, In Production
• Open Finance (Socrata) Module Setup complete, In Production • EP&L Business License Module Setup in progress
• 311 Civic Access Module Setup in progress
Next Step:
• Complete the testing of all Processes
• Test all forms and reports to ensure city needs are met • Begin planning on End User Training with Documentation for the city
3. NETWORK SERVICES RELOCATION
Description: Ensure rapid recovery, accessibility, and increased security for all business-critical application services by re locating to a more equipped offsite location.
Contract: TBD
Term: 5 Years
Budget: TBD
Current Spend: $0
Project Start: December 1, 2023
ETA: December 31, 2024
Status: ON SCHEDULE
• RFP issued 12/1/23.
• Sole bid rejected 1/23/24.
• Data Center Colocation award to vendor 4/2/24.
• Contract Executed
• Phase 1 Relocation completed 8/19/24.
• Phase 2 Relocation scheduled for 12/30/24.
4. CITY HALL COUNCIL CHAMBERS AUDIO/VIDEO
IMPROVEMENT
Description: Upgrade Council Chambers broadcast equipment.
Contract: In Progress
Term: 5 Years
Budget: City Hall Council Chambers A/V: $542,444.57 (PEG: $398,707 General Fund: $143,737.57)
Current Spend: $0
Project Start: December 1, 2023
ETA: November 30, 2024
Status: ON SCHEDULE
• RFP issued 12/1/23.
• Notice of Intent to Award 1/23/24.
• Contract Executed 5/1/24.
• Purchase Order
• Audiovisual Hardware Installation Complete
• Agenda Management/AV Control Software Implementation Complete • Agenda Management/AV Control Software Staff Training Complete
• Systems Testing Complete
• Punch List Items in Progress
5. CARSON EVENT CENTER AUDIO/VIDEO IMPROVEMENT
Description: Upgrade Carson Event Center Audiovisual broadcast equipment.
Contract: In Planning/Budgeting
Term: 5 Years
Budget: Carson Event Center A/V: TBD
Current Spend: $0
Project Start: July 1, 2024
ETA: June 30, 2025
Status: ON SCHEDULE
• Project Planning Meetings with ITS and Community Services staff on mitigation of scheduled event impact
Project Name Citywide Fire Alarm Repairs and Enhancements Service Provider West Coast Fire & Integration
Summary July 5, 2022, Council approved the West Coast Fire & Integration contract for maintenance and monitoring services for all city fire systems from July 1, 2022, to June 30, 2027.
Enhancing fire detection and safety for all facility users.
Update City personnel are collaborating with the vendor to address necessary improvements. The staff is concurrently in the process of enhancing all fire systems within the city and is also in the final phase of the integration of LFS systems with the new HVAC systems located in the basement and IT Room.
Project Name Public Safety/Emergency Services Community Initiatives Service Provider Public Safety/Emergency Services Department Summary Public Safety and Emergency Services Community Initiatives encompass a range of proactive efforts aimed at fostering safer and more resilient community. These initiatives typically involve engagement with the public, educational programs, and collaborative events. They focus on building positive relationships between law enforcement, emergency services personnel, and the community, ultimately enhancing preparedness and trust. Examples include public education on safety measures, community outreach events, and meetings to empower local leaders. Such initiatives are pivotal in strengthening the overall safety and well-being of a community.
Update Emergency Services and Public Safety have been actively engaging with the community in various initiatives. We’ve provided All Hazard training to our Block Captains in collaboration with our partners at LA County Fire. Additionally, we teamed up with the American Red Cross to conduct earthquake drills for children in the community. We also hosted an RX Takeback event in partnership with LA County Sheriffs. Lastly, Public Safety is working closely with local schools to promote the importance of emergency preparedness and encourage proactive participation. If you're interested in bringing a training to your area, please reach out to [email protected].
Project Name Comprehensive Camera Coverage: City Facilities and Parks Service Provider Johnson Controls
Summary The Public Safety department is spearheading an initiative to implement video surveillance camera systems across all City and Park facilities. This proactive measure aims to discourage criminal activities and capture video evidence of any unlawful incidents. The objective is to enhance safety by reducing criminal incidents, creating a secure environment for both residents and park users.
Update Video surveillance and access control systems have been installed at several parks. The team is now working on the second phase of the project, which will involve adding additional cameras and extending coverage to mini parks. This expansion aims to enhance security measures across all recreational areas, ensuring a safer environment for the community. The second phase will include assessing the current system's effectiveness, determining optimal locations for new cameras, and integrating these additions into the existing infrastructure. The team is committed to implementing advanced technology to improve park safety and monitor activities more effectively.
Public Safety/Emergency Services Projects
Project Name Enhancing Traffic Safety: Analysis of Accident Reduction and LPR Camera Deployment Service Provider Motorola Solutions
Summary The consultant will supply the city with the most up-to-date version of the L-Series Rapidly Deployable Solar Powered Camera. This camera system, known as an Automatic License Plate Recognition (LPR) camera, will assist the City, in collaboration with the Los Angeles County Sheriff's Department, in capturing essential investigative information and enhancing the safety of its residents. These cameras will be strategically positioned in specific locations throughout the city, including public rights of way and entrances to city facilities.
The LPR system will collect comprehensive vehicle data, including make, model, color, and speed, both during daytime and nighttime conditions. The City's Public Safety department is working in partnership with LASD and Public Works to decrease traffic accidents within the city. Staff members have created data maps, and the Traffic Engineering Division will assess these maps to identify any recurring patterns and make infrastructure adjustments as necessary.
Update ALPR trailers will continue to be deployed at city events, serving as both messaging boards and tools to enhance community safety.
Project Name Upgrading Radio Systems Project
Service Provider Mission Critical Information Systems
Summary In 2021, the City Council granted approval for the 'Radio Upgrade Project,' which allocated funds for the procurement of radios, radio equipment, batteries, and chargers necessary for transitioning the City from its UHF radio system to the Los Angeles Regional Interoperability Communication System (LA-RICS). Subsequently, the City Council sanctioned a contract with Mission Critical Information Systems to oversee the installation and programming, thus marking the successful completion of Phase 2 of the project. In September 2022, the City of Carson formalized a Hold Harmless Agreement with LA-RICS, granting the city the privilege of utilizing the platform.
Update Distribution of additional mobile radios has been completed amongst several departments.
The Motorola APX4500 mobile radios have been delivered, and the assembly of two SmartPTT racks at both City Hall and the Corporate Yard is underway. Additionally, the installation of antennas and lines at the City Yard is currently in progress.
Project Name Hazard Mitigation Plan Update
Service Provider Witt O’ Brien’s
Summary FEMA mandates a Hazard Mitigation Plan (HMP) update every five years for all jurisdictions. The city's second update, however, is currently overdue. This plan serves to identify potential natural and human-induced hazards that the city may face vulnerability to and outlines strategies for mitigating or reducing risks associated with such incidents and events.
Update A preliminary version of the Hazard Mitigation Plan (HMP) has been released. The planning team has conducted an internal review. The HMP draft has been submitted to Cal OES for their initial review.
Project Name Basement/Emergency Operations Center (EOC) Upgrade Project Service Provider Westberg + White, GM Interiors, Johnson Controls Summary The project is currently in its planning phase. Initially, the project scope only covered the upgrade of the Emergency Operations Center (EOC). However, during the planning phase, it became evident that the Public Safety, Information Technology, and Emergency Services sectors could also derive substantial benefits from the upgrade. As a result, the revised scope of work encompasses upgrades for all four areas.
Update The basement renovations have been approved by the council, and has begun. This will involve detailed planning and coordination with the contractor to ensure the project stays on schedule and meets all required standards. Staff will be overseeing the progress closely to ensure a smooth and efficient renovation process.
Project Name Organizational Resilience: Internal Emergency Management Training Service Provider Westward Disaster
Summary The city is responsible for the operation and management of its Emergency Operations Center (EOC), with the aim of enhancing preparedness, response, and recovery capabilities for emergencies and large-scale events. The consultant will furnish subject matter experts and instructors to aid in the creation and execution of a tailored EOC training program for city department staff.
Update Our Emergency Operations Center (EOC) Awareness Course took place on April 18th and received overall positive feedback. The course was a success and brings our city and leadership one step closer to being prepared for the next emergency. Next, Westward and the City of Carson will be working on the upcoming EOC role-specific training.
CITY OF CARSON
File #: Version:
Report to Honorable Mayor and City Council
Wednesday, November 6, 2024, 5:00 PM
CONSENT 19. To: Honorable Mayor and City Council From: Gary Carter, Director, Information Technology and Security ITS Administration Subject: CONSIDERATION OF APPROVAL OF CONTRACT FOR GOOGLE CLOUD PLATFORMSOFTWARE LICENSES, MAINTENANCE, AND SUPPORT WITH INSIGHT PUBLIC SECTOR, INC. (CITYCOUNCIL) I. SUMMARY
The City requires Google Cloud Platform software licenses, maintenance, and support to provide an interactive website chatbot, offering a significant improvement to the City’s document archival, storage and retrieval search to support the City’s ongoing commitment to transparency, accessibility, and an improved customer experience. The Google Cloud software will be implemented to improve public queries and requests for services on the City’s new website currently in development. The City currently does not have a chatbot on the current city website and the Google Cloud Platform will resolve complaints from the public about the difficulty searching for historical and archived information. The Google Cloud Platform agreement will provide software licenses for Google Compute, Storage and Databases, Networking, Big Data Transfer, Machine Learning, APIs, Internet-of-Things (IoT), Management, Develop and Security Tools. Staff is requesting City Council to consider approval of a new Contract with Insight Public Sector, Inc. to provide Google Cloud Platform software licenses, maintenance, and support under the State of California Cooperative Purchasing Program.
Staff is requesting City Council to consider approval of a Contract with Insight Public Sector, Inc. to provide Google Cloud Platform software licenses, maintenance, and support under the NASPO Cooperative Purchasing Program, for a total amount of $208,223.16 over a 3-year term, with an initial year amount of $69,407.72 and $69,407.72 for each renewal year.
II. RECOMMENDATION
1. APPROVE a contract with Insight Public Sector, Inc. for Google Cloud Platform software licenses, including software maintenance, and software support for a total contract amount not to exceed $208,223.16, for a term of 3 years; and
2. AUTHORIZE the Mayor to execute the contract after approval as to form by the City Attorney.
III. ALTERNATIVES
TAKE another action the City Council deems appropriate and consistent with the requirements of the City’s Purchasing Ordinance.
701 East Carson Street
IV. BACKGROUND
The City requires Google Cloud Platform Software Licenses to add a state-of-the art chatbot in response to resident requests for an interactive user experience option, enable text support, and coordinate handoff to the appropriate City representative via chat or phone during City business hours. In addition, residents have requested an improved user experience to search and access historical website documents. The City currently has a contract with Revize, LLC for the new City website development services currently in progress. However, Revize, LLC is not an authorized reseller for Google Cloud Platform licenses. City staff will coordinate with Revize, LLC to update the appropriate webpages to incorporate Google Cloud Platform into the new website design.
City staff seeks approval of a contract to procure and implement the City’s Google Cloud Platform software licenses. Staff received competitive pricing from Insight Public Sector, Inc. under the NASPO Cooperative Purchasing Program.
Section 2611(g) of the City’s Municipal Code (CMC) allows City, through its Purchasing Manager, to dispense with competitive bidding processes to purchase materials, supplies, equipment, or services by utilizing a cooperative purchasing program engaged in by any local, county, State, or Federal public entity or entities, even if the contracts and implementing agreements entered into by the participating entity or association under those cooperative purchasing programs were not entered into pursuant to a process that resulted in the contract being awarded to the lowest responsible and responsive bidder under CMC 2610(i); provided, that the selected bidder was selected in compliance with the competitive bidding or proposal process requirements of any participating entity or association within three years of City’s approval of the City contract entered into with the selected bidder via cooperative purchasing. The City Council has made a determination that the benefits to City of utilizing cooperative purchasing outweigh any incremental higher price that may be paid by City in certain instances as a result of not soliciting directly utilizing the lowest responsible and responsive bidder standard under CMC 2610(i).
The State of California is part of a NASPO cooperative purchasing program through which it entered into a contract with Google Cloud Platform Services supplied by Google, LLC authorized resellers including Insight Public Sector, Inc., referred to as The State of California Participating Addendum Number# 7-17-70-40-01-61001590 and California NASPO ValuePoint Master Agreement Number#AR2485, after engaging in a competitive bidding process, whereby it now receives Google Cloud Platform licenses at a significantly discounted rate.
The City’s Purchasing Manager has determined that the competitive bidding or proposal process utilized by The State of California for Google Cloud Platform Services licenses complies with the requirements of Section 2611(g) of the CMC and has therefore, waived the formal bidding process for procurement of the Google Cloud Platform licenses.
The City and Insight Public Sector, Inc., seek approval from City Council to execute a contract for total amount not to exceed $208,223.16 for a maximum term of three (3) years.
V. FISCAL IMPACT
The cost associated with the 3-year contract with Insight Public Sector, Inc., is not to exceed the amount of $208,223.16. The first-year costs for software licenses, including maintenance and support, is for a total of $69,407.72.
The total cost of $69,407.72 for the initial year of software licensing, including maintenance, and support is included in the current Information Technology & Security Department FY2024-25 budget. Software licensing, maintenance and support will be included in the proposed FY2025-26 and subsequent fiscal year budgets.
Fiscal Year Amount Account Number
FY2024-25 $69,407.72101-54-520-101-6004
FY2025-26 $69,407.72101-54-520-101-6004
FY2026-27 $69,407.72101-54-520-101-6004
Total $208,223.16101-54-520-101-6004
VI. EXHIBITS
1. Contract with Insight Public Sector, Inc.
2. Purchasing Waiver
Prepared by: Gary Carter, Director, Information Technology & Security Department
Attachments
Insight Contract Google Cloud Platform License Agreement (1028571.1).pdf Purchasing Waiver - Insight Google Cloud Platform JT.pdf
Rev. 07/24Q 1
Google Cloud Platform Order Form Agreement
Workflow # 4010091639
Customer Name: City of Carson, CA Customer Acct. # 10957622 Address: 701 E CARSON ST CARSON
California, 90745-2224 Customer Contact: Gary Carter
State/Fed Contract:
State of California-NASPO
Cloud Solutions- AR2485/ 7-
17-70-40-01-61001590
Domain: Carsonca.gov
This Order Form (“Agreement”) governs access to and use by the customer named above, on behalf of itself and its affiliates, successors, customers, and end users (collectively, the “Customer”, “You” or “Your”) of the Google Cloud Platform Services supplied by Google, LLC (the “Supplier” or “Google”) and provisioned through Insight Public Sector, Inc. (“Insight”). The individual accepting this Agreement on behalf of Customer represents and warrants that he/she/they: (i) has full legal authority to bind Customer to this Agreement; (ii) has read and understands this Agreement; and (iii) agrees to the Agreement on behalf of Customer. If you do not have the legal authority to bind Customer, please do not accept this Agreement, or provision or use of any Services. Capitalized terms used in this Agreement that are not defined herein have the meanings assigned to them in the Google Cloud Master Agreement – Public Sector, available at
https://static.carahsoft.com/concrete/files/8116/6981/5470/US_Public_Sector_CMA_flowdowns_10.17 .22_-_GCP.pdf (“Google TOS”). All references to “Reseller and/or Distributor” in the Google TOS are references to Insight, for purposes of this Agreement.
1. Terms of Sale and Terms of Use for Cloud Services.
1.1. Terms of Sale. The purchase of the Services will be subject to the NASPO ValuePoint Cloud Solutions contract (“NASPO Contract”), including, but not limited to, pricing (where applicable) which will be set forth in the Google Cloud Platform console, tools or platform used by You to procure Services (the “Console”). If there is a conflict between the NASPO Contract and any of the other documents that comprise the Agreement (“Conflicting Terms”), the terms of the NASPO Contract (“Prevailing Terms”) will take precedence over the Conflicting Terms solely with respect to Your use of the Google Cloud Platform Services. Moreover, the Prevailing Terms shall be construed as narrowly as possible to resolve the conflict while preserving as much of the Agreement as possible, including, but not limited to, preserving non-conflicting provisions contained within the same paragraph, section, or sub-section as the Conflicting Terms. FOR THE AVOIDANCE OF DOUBT,
NOTWITHSTANDING THE PRESENCE OR ACCEPTANCE BY INSIGHT OF ANY SEPARATE
PURCHASE ORDER YOU MAY PROVIDE, TO THE EXTENT SUCH PURCHASE ORDER
CONTAINS OTHER TERMS, IT WILL BE FOR ADMINISTRATIVE PURPOSES ONLY AND THE
PARTIES AGREE THAT THE GOVERNING TERMS AND CONDITIONS SHALL BE THOSE SET
FORTH IN THIS AGREEMENT, UNLESS OTHERWISE AGREED TO IN WRITING BY INSIGHT AND YOU.
1.2. Terms of Service. The Services are provided by the Supplier and are subject to the Google TOS, which are incorporated into this Agreement as if fully set forth herein. Such terms, including any additional Supplier terms provided in this Agreement, will apply to Your access to and use of the Services. By provisioning Services through the Console, you represent, warrant and covenant that you will not use the Services unless You have agreed to the Google TOS. For the avoidance of doubt, any change or update to the online version of the Google Cloud Platform Terms of Service found at https://cloud.google.com/terms (except for changes to the sections enumerated in Section
1.4 of the TOS, managed by Google) shall have no force or effect and shall not result in an amendment of the rights or obligations of the parties under this Agreement. The Google TOS are fixed, non-negotiable and may not be revised by either party.
Rev. 07/24Q 2
1.3. Your Account. Once an account has been set up for you, Services may be enabled and provisioned by you via the Console. Use, reporting and invoicing of the Services are based on a consumption or actual use basis, as further described below. You will be invoiced for the Services you consume in accordance with usage reports provided by the Supplier.
1.4. Third-Party Content. Third-Party Content, such as software applications provided by third parties, may be made available directly to you by other companies or individuals under separate terms and conditions, including separate fees and charges. Because we may not have tested or screened the Third-Party Content, your use of any Third-Party Content is at your sole risk.
2. Security and Data Privacy
2.1. Your Content. You are solely responsible for the development, content, operation, maintenance, and use of your Content such as, but not limited to: (a) compliance of your Content with the Acceptable Use Policy, the other Policies, and the law; (b) any claims relating to your Content; and (c) properly handling and processing notices sent to you (or any of your affiliates) by any person claiming that your Content violates such person’s rights, including without limitation, notices pursuant to the Digital Millennium Copyright Act.
2.2. Other Security and Backup. You are responsible for properly configuring and using the Services and taking your own steps to maintain appropriate security, protection, and backup of your Content, which may include the use of encryption technology to protect your Content from unauthorized access and routine archiving of your Content.
2.3. Privacy Policy. Google Cloud Platform Services are subject to Google's privacy policy located http://www.google.com/policies/privacy/ as modified from time to time. Both parties acknowledge and agree that Insight will have no access to Customer and/or End User data stored on Google Cloud Platform. To the extent any European Data Protection Legislation or Non-European Data Protection Legislation applies to the performance of Insight’s duties as reseller under this Agreement, Insight shall be liable to Customer for its non-compliance. You agree that Insight and Google are processors, and You are the controller, of any personal data.
3. Fees and Invoicing
3.1. Fees. The unit or per seat fees for Services payable by You will be the current Google list price less any applicable Google provided discount or Google provided credit, if applicable, at the time the applicable Services are consumed by You, less a six percent (6%) discount from MSRP at invoice. Such Fees are detailed in Schedule A, attached hereto and incorporated herein by this reference. Total Fees payable by you, with Insight's discount (if any), will be set forth in Insight's invoice in the manner described below. Insight reserves the right to modify the Fees payable as a result of changes implemented by Google to its partner/distributor program. If You exceed the usage limits, fee thresholds, Committed Units or any prepaid credits applicable to the Service, You agree to pay for the fees and charges for such over usage. For any extension of a Services subscription term or the provisioning of a Service upgrade, the then-current price will apply, unless otherwise mutually agreed in writing by You and Insight. Insight, may, from time to time in its sole discretion, change the fees it charges for the Service. Any increase in the fees will take effect at the beginning of the new subscription term. Insight will notify You of any such changes by updating the Console or sending notice by e-mail or regular mail.
3.2. DISCOUNTS AND EXCLUSIONS. Discounts only apply to Cloud Services which Insight is authorized to resell under Google’s reseller program. GCP prices will be set to then-current list pricing (available on the Fees URL) after the Discount Period or the date on which this Agreement terminates. In addition, Discounts do not apply to:
3.2.1. Items listed at https://cloud.google.com/skus/exclusions (“Exclusions List”) as of the Implementation Date and anything added to the Exclusions List that is not already discounted for Customer under the Sub-Account when added.
Rev. 07/24Q 3
3.2.2. Any Google Support SKUs listed at https://cloud.google.com/support.
3.2.3. Non-Google third-party services available via Google Marketplace.
3.2.4. Google Maps services.
Unless explicitly stated otherwise, (i) if more than one discount applies to the same SKU, only the discount providing the lowest price will apply, and (ii) percentage discounts are in addition to any applicable Committed Use Discount. All other Google SKUs will be charged at then-current list prices at the Fees URL less any Insight-Provided discounts. You should contact your Client Executive with any questions about the applicability of discounts to Your Services.
3.3. Invoicing/Payment. Unless otherwise set forth herein, Services used or enabled by you, including without limitation, any additions, reductions, increases or decreases in the per unit quantity of the Services used, will be invoiced on an actual use or consumption basis as measured and reported to Insight by Google. Google’s records and usage reports are taken to be correct unless proven by you to be in error. Insight will invoice you monthly in arrears for the Services consumed in each preceding monthly billing period on an actual use or consumption basis as reported by Google. Unless otherwise agreed to in writing between the parties, you must pay all undisputed invoices in full within thirty (30) days of the invoice date. If You have purchased prepaid credits, You will be invoiced monthly against Your prepaid amount. You will have the option to either purchase additional increments of prepaid credits or default to consumption-based billing. Should You fail to purchase additional prepaid credits and Your usage exceeds Your prepaid credit amount, You agree to pay Insight for any and all amounts owed to Google for such over usage and You will continue to be invoiced on an actual use basis as reported to Insight by Google.
Refunds (if any) are at the discretion of Insight and Google and will only be in the form of a credit for the Services.
3.4. Delinquent Payments. Customer is responsible for all reasonable expenses (including collections and/or attorneys’ fees) incurred by Insight in collecting delinquent amounts, except where these unpaid or delinquent amounts are due to billing inaccuracies attributable to Insight.
3.5. Google Cloud Platform Service SLAs. The Google Cloud Platform Services are more fully described at https://developers.google.com/cloud/services and are subject to the service level agreements found at https://cloud.google.com/terms/sla/. ANY CREDITS OR
TERMINATION RIGHTS DESCRIBED UNDER THE SLA SHALL BE THE SOLE AND EXCLUSIVE
REMEDY OF CUSTOMER IN CONNECTION WITH ANY UNAVAILABILITY OF THE SERVICES OR BREACH OF THE SLA.
4. Term/Termination
4.1. Agreement Term. The "Term" of this Agreement will begin on the Effective Date and continue for a period of three (3) years thereafter unless the Agreement is terminated as set forth in this Article 4 of the Agreement.
4.2. Termination for Breach. Either party may terminate this Agreement for breach if: (i) the other party is in material breach of the Agreement and fails to cure that breach within thirty days after receipt of written notice; (ii) the other party ceases its business operations or becomes subject to insolvency proceedings and the proceedings are not dismissed within ninety days; or (iii) the other party is in material breach of this Agreement more than two times notwithstanding any cure of such breaches.
4.3. Termination for Inactivity. Insight or Google reserves the right to terminate the provision of the Service(s) to a Project upon 30 days advance notice if, for a period of 60 days (i) Customer has not accessed the Admin Console or the Project has had no network activity; and (ii) such Project has not incurred any Fees for such Service(s).
4.4. Termination for Convenience. Customer may stop using the Services at any time.
Customer may terminate this Agreement for its convenience at any time on prior written notice and upon termination, must cease use of the applicable Services. Insight may
Rev. 07/24Q 4
terminate this Agreement for its convenience at any time without liability to Customer.
This section will not apply to Services with a minimum commitment.
4.5. Effect of Termination. If the Agreement is terminated, then: (i) the rights granted by one party to the other will immediately cease; (ii) all Fees owed by Customer to Insight are immediately due upon receipt of the final bill; (iii) Customer will delete the Software, any Application, Instance, Project, and any Customer Data or Customer will transfer billing account direct to Google or a new service provider; and (iv) upon written request, each party will use commercially reasonable efforts to return or destroy all Confidential Information of the other party. Insight shall have no responsibility for the preservation of Customer Data upon termination.
5. Additional Required Terms
5.1. Liability for Breach/Indemnity. In addition to any liability Customer may have to Insight, Customer agrees that Customer will also be legally responsible directly to Google for any breach of these terms and conditions. Unless prohibited by applicable law, Customer will indemnify, defend, and hold harmless Insight and Google, and their respective affiliates, from and against all liabilities, damages, and costs (including settlement costs and reasonable attorneys' fees) arising out of a third-party claim: (a) regarding any Application, Project, Instance, Customer Data, or Customer trademark; or (b) regarding Customer's, or its end users', use of the Google Cloud Platform Services in violation of the Acceptable Use Policy. Google is a third-party beneficiary to this Agreement with respect to the terms and conditions set forth herein.
5.2. No Warranties. EXCEPT AS EXPRESSLY SET FORTH IN THE SERVICE SPECIFIC TERMS
FOR PREMIUM SOFTWARE OR UNDER THIS AGREEMENT, TO THE FULLEST EXTENT PERMITTED BY LAW: (a) INSIGHT, GOOGLE, AND/OR ITS RESPECTIVE SUPPLIERS DO
NOT MAKE ANY WARRANTY OF ANY KIND, WHETHER EXPRESS, IMPLIED, STATUTORY OR
OTHERWISE, INCLUDING WITHOUT LIMITATION WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR USE AND NON-INFRINGEMENT; (b) INSIGHT, GOOGLE,
AND/OR THEIR RESPECTIVE SUPPLIERS ARE NOT RESPONSIBLE OR LIABLE FOR THE
DELETION OF OR FAILURE TO STORE ANY CUSTOMER DATA AND OTHER COMMUNICATIONS MAINTAINED OR TRANSMITTED THROUGH USE OF THE SERVICES; (c)
CUSTOMER IS RESPONSIBLE FOR SECURING AND BACKING UP ITS APPLICATION, PROJECT, AND CUSTOMER DATA; and (d) NEITHER GOOGLE NOR INSIGHT WARRANTS
THAT THE OPERATION OF THE SOFTWARE OR THE SERVICES WILL BE ERROR-FREE OR UNINTERRUPTED. NEITHER THE SOFTWARE NOR THE SERVICES ARE DESIGNED, MANUFACTURED, OR INTENDED FOR HIGH-RISK ACTIVITIES.
5.3. Intellectual Property Rights. As between the parties, Customer owns all Intellectual Property Rights in Customer Data and the Application or Project (if applicable), and Google owns all Intellectual Property Rights in the Google Cloud Platform Services and Software.
5.4. LIMITATION OF LIABILITY. UNLESS PROHIBITED BY APPLICABLE LAW, NEITHER
PARTY WILL BE LIABLE UNDER THIS AGREEMENT FOR LOST REVENUES OR INDIRECT,
SPECIAL, INCIDENTAL, CONSEQUENTIAL, EXEMPLARY, OR PUNITIVE DAMAGES, EVEN IF
THE PARTY KNEW OR SHOULD HAVE KNOWN THAT SUCH DAMAGES WERE POSSIBLE AND EVEN IF DIRECT DAMAGES DO NOT SATISFY A REMEDY. NEITHER PARTY MAY BE HELD LIABLE UNDER THIS AGREEMENT FOR MORE THAN TWO (2) TIMES THE AMOUNT PAID OR PAYABLE BY CUSTOMER TO INSIGHT FOR THE SERVICES DURING THE 12 MONTHS PRIOR TO THE EVENT GIVING RISE TO LIABILITY. These limitations of liability set forth in the foregoing sentences do not apply to breaches of confidentiality obligations, violations of a party’s intellectual property rights by the other party, indemnification obligations, or Customer’s payment obligations. GOOGLE WILL HAVE NO LIABILITY FOR ANY DAMAGES,
WHETHER DIRECT, INDIRECT, INCIDENTAL OR CONSEQUENTIAL, ARISING FROM INSIGHT’S RESALE OF THE SERVICES TO CUSTOMER.
5.5. Other Restrictions. Customer will not, and will not allow third parties under its control to: (a) copy, modify, create a derivative work of, reverse engineer, decompile, translate, disassemble, or otherwise attempt to extract the source code of the Google Cloud Platform
Rev. 07/24Q 5
Services or any component thereof (except to the extent such restriction is expressly prohibited by applicable law); (b) use the Google Cloud Platform Services for High Risk Activities; (c) sublicense, resell, or distribute the Google Cloud Platform Services or any component thereof separate from any integrated Application; (d) use the Google Cloud Platform Services to create, train, or improve (directly or indirectly) a substantially similar product or service, including any other machine translation engine; (e) unless otherwise set forth in the Service Specific Terms, use the Services to operate or enable any telecommunications service or in connection with any Application that allows its end users to place calls or to receive calls from any public switched telephone network; (f) process or store any Customer Data that is subject to the International Traffic in Arms Regulations maintained by the Department of State; or (g) unless expressly permitted to, use the Services for any purpose or in any manner involving Protected Health Information (as defined in HIPAA).
5.6. Acceptable Use Policy. Customer will comply with the Acceptable Use Policy and ensure that its Applications, Projects, and Customer Data, and use thereof by its end users comply with the Acceptable Use Policy. Insight and Google reserve the right to review the Application, Project, and Customer Data to ensure Customer's compliance with the Acceptable Use Policy.
5.7. Service Specific Terms and Data Processing and Security Terms. Customer will comply with the Service Specific Terms. The Service Specific Terms (available at https://cloud.google.com/terms/service-terms) and Data Processing and Security Terms (available at https://cloud.google.com/terms/data-processing-terms) are incorporated by this reference into the Agreement.
5.8. Terms Related to Anthos Products. If Customer is purchasing Anthos Products, the following terms shall apply:
5.8.1. During the Term, or so long as Customer is purchasing Anthos Products under the pay-as-you-go model, Customer must purchase and maintain Google technical support in order to receive technical support for the Anthos Product directly from Google;
5.8.2. Customer may not, on behalf of a hyperscale public cloud provider, itself, or any other third-party, without Google’s prior written consent, (a) conduct (directly or through a third-party) any comparative or compatibility testing, benchmarking, or evaluation (each, a “Test”) of the Anthos Products, or (b) disclose the results of any such Test.
BY SIGNING THIS AGREEMENT (OR ISSUING A PURCHASE ORDER IN LIEU OF SIGNATURE), YOU HEREBY CERTIFY THE FOLLOWING: THAT (1) YOU ARE DULY AUTHORIZED ON BEHALF OF CUSTOMER TO ACCEPT THIS ORDER, (2) THAT YOU ACCEPT THIS ORDER AND ALL APPLICABLE TERMS AND CONDITIONS ON BEHALF OF CUSTOMER, AND (3) THAT YOU AGREE TO PAY FOR ALL ORDERS,
CHANGES, AND/OR INCREASES IN USAGE SUBSEQUENTLY PROVISIONED BY YOU UNDER YOUR ACCOUNT.
Client
By:
Authorized Representative
Print
Name:
Title:
Date:
Rev. 07/24Q 6
SCHEDULE A - FEES AND ADDITIONAL ORDER DETAILS
Fees:
All prices set forth in this Schedule A are estimates of monthly Services usage only. Customer is responsible for all actual Services charges accrued in accordance with Section 3of this Agreement.
Services Order Details:
Part Number Type of Description of Services Price
G-POINTS-MON GCP Points-Access to all GCP Solutions-
Compute, Storage & Databases, Networking, Big
Data Data Transfer, Machine Learning, APIs, IoT,
Management, Developer and Security Tools-
Payment-Monthly based Usage
Year 1-12 Month Term
Google - G-POINTS-MON
Type: New
Product: GCP
$69,407.72
G-POINTS-MON GCP Points-Access to all GCP Solutions-
Compute, Storage & Databases, Networking, Big
Data Data Transfer, Machine Learning, APIs, IoT,
Management, Developer and Security Tools-
Payment-Monthly based Usage
Year 2-12 Month Term
Google - G-POINTS-MON
Type: New
Product: GCP
$69,407.72
G-POINTS-MON GCP Points-Access to all GCP Solutions-
Compute, Storage & Databases, Networking, Big
Data Data Transfer, Machine Learning, APIs, IoT,
Management, Developer and Security Tools-
Payment-Monthly based Usage
Year 3-12 Month Term
Google - G-POINTS-MON
Type: New
Product: GCP
$69,407.72
Total Quote $208,223.16
*The parties acknowledge that Insight Public Sector’s NASPO ValuePoint Cloud Solutions contract #AR2485/ 7-17-70-40-01 expires on September 15, 2026, and further agree that any payments after that date pursuant to this Agreement will be made under the resulting replacement contract, if available, and if not, then as an open market purchase or via a mutually negotiated con tract between Insight and Customer incorporating substantially those terms of the existing NASPO ValuePoint Cloud Solutions contrac t.
True-up Fees: If at the end of the commitment period, Customer’s spending under this account falls short of the minimum spending commitment, Customer will pay the difference between its spending and its commitment.
City of Carson
Purchasing Division
701 E. Carson Street
Carson, CA 90745
(310) 952-1758
Purchasing Waiver
In compliance with Chapter 6 (Purchasing System) of Article II (Administration) of the Carson Municipal Code (CMC), Staff are seeking to exercise waiver of the following requirements (check all that apply):
☒(A) Formal Bidding (Section 2611)
☐ (B) Written Contract (Section 2605(1)(iii))
If (A) is selected above, please select the exception being exercised for this purchase:
☐ (d) Emergency Purchasing (Section 2611(d))
☐ (e) Sole Source Purchasing (Section 2611(e))
☐ (f) Piggyback Purchasing (Section 2611(f))
☒(g) Cooperative Purchasing (Section 2611(g))
☐ (i) Other Purchase Exceptions (Section 2611(i)(1) through 2611(i)(18)) If (e) or (f ) are se lec ted above, please specify the contrac t number, awarding agency, and other contracting parties being exercised for this purchase:
NASPO Cloud Solutions - AR2485/7-17-70-40-01-61001590
Req # (if available):N/A
Vendor Name: Insight
Formal bidding and/or a written contract would normally be required because the purchase is for an amount $75,000 or more; here, the amount is $208,223.16 Written justification or summary of purchase.
Google Cloud Platform solutions including compute, storage, databases, machine learning, and APIs for City website integration.
Purchasing: Authorized Department Staff:
Josilla Togiola, Purchasing Manager
10/16/2024
Name/Title: Gary Carter, IT & Security Director
Date:
*Attach all relative applicable documents including, but not limited to vendor quote, statement of sole source justification on vendor letterhead, relative contract agreements for piggybacking or cooperative purchasing exceptions, etc.
**Attach a copy of the fully executed waiver to the corresponding requisition. 0224JT
CITY OF CARSON
File #: Version:
Report to Honorable Mayor and City Council
Wednesday, November 6, 2024, 5:00 PM
CONSENT 20. To: Honorable Mayor and City Council From: Michael Whittiker, Community Services Director CS Community Services Subject: CONSIDER APPROVING AMENDMENT NO. 2 TO THE MEMORANDUM OF UNDERSTANDING(MOU) BETWEEN THE CITY OF CARSON AND CALIFORNIA STATE UNIVERSITY DOMINGUEZ HILLS(CSUDH) TO EXPAND EXISTING OCCUPATIONAL THERAPY PROGRAM TO INCLUDE ALL STUDENTS IN THECOLLEGE OF HEALTH, HUMAN SERVICES, AND NURSING (CHHSN) TO OBTAIN APPLICABLE EXPERIENCEIN CITY PROGRAMS (CITY COUNCIL) I. SUMMARY
Since 2015, the City of Carson has collaborated with California State University Dominguez Hills (CSUDH) to provide current Occupational Therapy students the opportunity to obtain real-time, professional experience by working in the City's program at no cost to Carson. Currently, the MOU (Exhibit No. 1) and its subsequent Council- approved Amendment 1 (Exhibit No. 2) only permits students in this field to participate through June 30, 2029. The proposed Amendment 2 will authorize potential future partnerships during the term of the MOU (i.e., between now and June 30, 2029) across all programs within the College of Health, Human Services, and Nursing (CHHSN). Each specific subject area will still require a separate Implementation Agreement detailing how each endeavor will operate; however, Amendment No. 2 provides the City with the ability to initiate an expanded partnership with the University and College. The goal of this proposal is to allow other students in CHHSN to acquire needed experience while providing additional services to the Carson community.
II. RECOMMENDATION
TAKE the following actions:
1. APPROVE Amendment No. 2 to Memorandum of Understanding between the City of Carson and California State University, Dominguez Hills (CSUDH) that will expand its collaboration to include students across all programs in the College of Health, Human Services, and Nursing.
2. AUTHORIZE the Mayor to execute Amendment No. 2 to the Memorandum of Understanding, following approval as to form by the City Attorney.
III. ALTERNATIVES
TAKE another action City Council deems appropriate.
IV. BACKGROUND
701 East Carson Street
For the past nine (9) years, the City of Carson and California State University Dominguez Hills (CSUDH) have partnered on an initiative that allows current Occupational Therapy students to obtain hands-on experience by working in the City's Occupational Therapy (OT) program. This endeavor is intended to help students grow professionally while providing OT participants a much-need service free of charge. This collaboration was approved through an Memorandum of Understanding (MOU) that established the criteria for cooperation between both parties and coordinates the placement of CSUDH students in the program (Exhibit No. 1). On June 18, 2024, City Council approved Amendment No. 1 to this MOU to extend the term of the relationship through June 30, 2029 (Exhibit No. 2).
To further strengthen this collaboration and provide additional services to residents, staff seeks the ability to partner across all programs within the College of Health, Human Services, and Nursing (CHHSN) during the extended term of the MOU. Approval of Amendment No. 2 (Exhibit No. 3) would provide staff the ability to initiate an expanded relationship with the College, and therefore work with each subject area to develop the required Implementation Agreement that would allow this endeavor to grow.
V. FISCAL IMPACT
None.
VI. EXHIBITS
1. Memorandum of Understanding between City of Carson and California State University Dominguez Hills
2. Amendment 1 to Memorandum of Understanding between City of Carson and California State University Dominguez Hills
3. Proposed Amendment 2 to Memorandum of Understanding between City of Carson and California State University Dominguez Hills
Prepared by: Michael Whittiker, Jr., Director of Community Services/Recreation/Park Maintenance Department andToni Costanzo, A/Principal Administrative Analyst
Attachments
Memorandum of Understanding between City of Carson and California State University Dominguez Hills.pdf Amendment 1 to Memorandum of Understanding between City of Carson and California State UniversityDominguez Hills.pdf Proposed Amendment 2 to Memorandum of Understanding between City of Carson and California State UniversityDominguez Hills.pdf
01007.0001/977969.1
AMENDMENT NO. 1
TO MEMORANDUM OF UNDERSTANDING
THIS AMENDMENT TO THE MEMORANDUM OF UNDERSTANDING
(“Amendment”) by and between the CITY OF CARSON, a California municipal corporation (“City”) and the Trustees of the California State University , an agency of the State of California, on behalf of the California State University, Dominguez Hills (“CSUDH”) is effective as of the 30th day of June, 2024. City and CSUDH are each sometimes referred to individually herein as a “Party”).
RECITALS
A. City and CSUDH entered into that certain non-binding Memorandum of Understanding dated June 8, 2022 (“MOU”), providing for cooperation in the area of Occupational Therapy between the City and the Occupational Therapy Department at CSUDH.
B. Pursuant to Section 3 of the MOU, the term of the MOU commenced June 1, 2022 and was to expire on June 30, 2024. Pursuant to Section 4(i) of the MOU, the MOU may be amended or extended by mutual written consent of the two Parties.
C. City and CSUDH now desire to amend the MOU to extend its term by five (5) years (subject to the parties’ termination rights under applicable provisions of the MOU) to provide for continued cooperation in the area of Occupational Therapy between the City and the Occupational Therapy Department at CSUDH.
D. Additionally, the MOU references and incorporates Affiliation Agreement No. 8303-22 between City and CSUDH, which was also originally slated to expire June 30, 2024, and which is also being amended (via a separate Amendment No . 1 to the Affiliation Agreement) to extend its term by five (5) years concurrent with the extension of the MOU. Accordingly, City and CSUDH also desire to amend the MOU to reflect the extended expiration date of the Affiliation Agreement where referenced in the MOU.
TERMS
1. Contract Changes . The MOU is amended as provided herein (added text is indicated in bold italics, deleted text is indicated in strikethrough font).
A. Section 3 (“Term”) of the MOU is amended to read in its entirety as follows:
“The MOU shall be effective June 1, 2022 to June 30, 2029 2024 but may be terminated by the appropriate authorities of either Party by giving a three (3) months’ notice to the other Party in writing, unless an earlier termination date is mutually agreed to in writing.”
B. Subsection (e) of Section 4 (General Provisions) of the MOU is amended to read in its entirety as follows:
EXHIBIT NO. 1
3 01007.0001/977969.1
“Prior to the initiation of each activity, the terms of cooperation for each specific activity implemented under this MOU shall be m utually discussed and agreed upon in writing by both Parties in a separate Implementing Agreement. Any such Implementing Agreements will form appendices to this Memorandum of Understanding. The Affiliation Agreement No. 8303- 22, between CSUDH and CC, for t he term July 1, 2021 to June 30, 2029 2024, consisting of 4 pages, shall be incorporated herein and made a part of this MOU.
2. Continuing Effect of MOU. Except as amended by this Amendment, all provisions of the MOU shall remain unchanged and in full force a nd effect. From and after the date of this Amendment, whenever the term “MOU” appears in the MOU, it shall mean the MOU, as amended by this Amendment to the MOU.
3. Affirmation of MOU. City and CSUDH each ratify and reaffirm each and every one of the respective rights and obligations arising under the MOU. Each Party represents and warrants to the other that there have been no written or oral modifications to the MOU other than as provided herein. Each Party represents and warrants to the other that the MOU is currently an effective, valid, and binding obligation, except as otherwise provided in the MOU.
4. Authority. Each Party represents and warrants that the person(s) signing below on its behalf has the authority to enter into this Amendment and that this Amendment does not violate any of its existing agreements or obligations.
[SIGNATURES ON FOLLOWING PAGE]
EXHIBIT NO. 1
4 01007.0001/977969.1
IN WITNESS WHEREOF , the Parties have executed this A mendment on the date and year first-above written.
CITY:
CITY OF CARSON, a municipal corporation
Lula Davis-Holmes, Mayor
ATTEST:
Dr. Khaleah K. Bradshaw, City Clerk
APPROVED AS TO FORM:
ALESHIRE & WYNDER, LLP
Sunny K. Soltani, City Attorney
[brj]
CSUDH:
CALIFORNIA STATE UNIVERSITY,
DOMINGUEZ HILLS
By:
Name:
Title:
By:
Name:
Title:
EXHIBIT NO. 1
5 01007.0001/1008828.2
AMENDMENT NO. 2
TO MEMORANDUM OF UNDERSTANDING
THIS AMENDMENT TO THE MEMORANDUM OF UNDERSTANDING
(“Amendment”) by and between the CITY OF CARSON, a California municipal corporation (“City”) and the Trustees of the California State University , an agency of the State of California, on behalf of the California State University, Dominguez Hills (“CSUDH”) is effective as of the _____ day of _______, 2024. City and CSUDH are each sometimes referred to individually herein as a “Party” and collectively as the “Parties”).
RECITALS
A. City and CSUDH entered into that certain non-binding Memorandum of Understanding dated June 8, 2022 (“MOU”), providing for cooperation in the area of Occupational Therapy between the City and the Occupational Therapy Department at CSUDH.
B. Pursuant to Section 3 of the MOU, the term of the MOU commenced June 1, 2022 and was to expire on June 30, 2024. Pursuant to Section 4(i) of the MOU, the MOU may be amended or extended by mutual written consent of the Parties.
C. Effective June 30, 2024 , City and CSUDH entered into Amendment No. 1 to the MOU, which amended the MOU to extend its term by five (5) years (subject to the Parties’ termination rights under applicable provisions of the MOU) to provide for continued cooperation in the area of Occupational Therapy between the City and the Occupational Therapy Department at CSUDH.
D. Additionally, the MOU references and incorporates Affiliation Agreement No. 8303-22 between City and CSUDH (“Affiliation Agreement”), which was also originally slated to expire June 30, 2024, and which was also amended (via a separate Amendment No. 1 to the Affiliation Agreement) by City and CSUDH effective June 30, 2024, to extend its term by five (5) years concurrent with the extension of the MOU pursuant to Amendment No. 1 to the MOU.
E. The Parties now desire to amend the MOU a second time, by this Amendment, to expand the scope of the stated area of cooperation, which is currently limited to the Occupational Therapy Department (which is a part of CSUDH’s College of Health, Human Services, and Nursing), to also include all other programs within CSUDH’s College of Health, Human Services, and Nursing, which consists of the following programs:
01007.0001/1008828.2
F. Although the MOU, as amended by this Amendment, will provide for cooperation in the additional areas listed above, the actual initiation of activity in any of the additional areas will not commence unless and until a separate Implementing Agreement has been entered into by and between the Parties as provided in Section 4(e) of the MOU.
TERMS
1. Contract Changes . The MOU is amended as provided herein (added text is indicated in bold italics, deleted text is indicated in strikethrough font).
A. Section 1 is amended as follows: “The area of cooperation will be between the College of Health, Human Services, and Nursing Occupational Therapy Department at California State University Dominguez Hills (CSUDH) and City of Carson (CC).”
2. Continuing Effect of MOU. Except as amended by Amendment No. 1 and this Amendment, all provisions of the MOU shall remain unchanged and in full force and effect. From and after the date of this Amendment, whenever the term “ MOU” appears in the MOU, it shall mean the MOU, as amended by Amendment No. 1 and this Amendment to the MOU.
3. Affirmation of MOU. City and CSUDH each ratify and reaffirm each and every one of the respective rights and obligations arising under the MOU. Each Party represents and warrants to the other that there have been no written or oral modifications to the MOU other than as provided herein. Each Party represents and warrants to the other that the MOU is currently an effective, valid, and binding obligation, except as otherwise provided in the MOU.
01007.0001/1008828.2
4. Authority. Each Party represents and warrants that the person(s) signing below on its behalf has the authority to enter into this Amendment and that this Amendment does not violate any of its existing agreements or obligations.
[SIGNATURES ON FOLLOWING PAGE]
01007.0001/1008828.2
IN WITNESS WHEREOF , the Parties have executed this A mendment on the date and year first-above written.
CITY:
CITY OF CARSON, a municipal corporation
Lula Davis-Holmes, Mayor
ATTEST:
Dr. Khaleah K. Bradshaw, City Clerk
APPROVED AS TO FORM:
ALESHIRE & WYNDER, LLP
Sunny K. Soltani, City Attorney
[brj]
CSUDH:
CALIFORNIA STATE UNIVERSITY,
DOMINGUEZ HILLS
By:
Name:
Title:
By:
Name:
Title:
CITY OF CARSON
File #: Version:
Report to Honorable Mayor and City Council
Wednesday, November 6, 2024, 5:00 PM
CONSENT 21. To: Honorable Mayor and City Council From: Dr. Arlington Rodgers, Director of Public Works PW Engineering Subject: CONSIDER APPROVAL OF PLANS, SPECIFICATIONS, AND ESTIMATES AND AUTHORIZATIONTO ADVERTISE FOR CONSTRUCTION BIDS; AND RECORDING A “NOTICE OF EXEMPTION” IN THE OFFICEOF THE LOS ANGELES COUNTY CLERK AND WITH THE STATE CLEARING HOUSE FOR PROJECT NO.1756: FIGUEROA STREET IMPROVEMENT PROJECT (FIGUEROA BOULEVARD FROM CARSON TO LOMITABLVD), PURSUANT TO SECTION 15301 OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT GUIDELINES(CITY COUNCIL) I. SUMMARY
Project No. 1756: Figueroa Street Improvement Project covering Figueroa Street from Carson Street to Lomita Boulevard (Exhibit No. 1) is included in the City’s Capital Improvement Program (CIP) for FY 24-25.
The Plans, Specifications, and Estimates (PS&E) for Project No. 1756: Figueroa Street Improvement Project, covering Figueroa Street from Carson Street to Lomita Boulevard (Exhibit No. 2) have been completed and are ready for construction bids. The PS&E are on file in the City Engineer’s Office. The estimated construction cost is $8,000,000.00.
The City Council is requested to authorize staff to advertise for construction bids, and to record the Notice of Exemption to satisfy the California Environmental Quality Act’s requirements (Exhibit No. 3) II. RECOMMENDATION
TAKE the following actions:
1. APPROVE PS&E for Project No. 1756: Figueroa Street Improvement Project covering Figueroa Street from Carson Street to Lomita Boulevard.
2. AUTHORIZE staff to advertise the work and call for construction bids for Project No. 1756: Figueroa Street Improvement Project, covering Figueroa Street from Carson Street to Lomita Boulevard.
3. MAKE the California Environmental Quality Act finding that the proposed Project No. 1756: Figueroa Street Improvement Project, covering Figueroa Street from Carson Street to Lomita Boulevard, is categorically exempt pursuant to Section 15301 of the California Environmental Quality Act guidelines.
4. AUTHORIZE staff to record the “Notice of Exemption” in the office of the Los Angeles County Clerk and with the State Clearing House at the Governor’s Office of Planning and Research for Project No. 1756: Figueroa Street Improvement Project, covering Figueroa Street from Carson Street to Lomita Boulevard.
III. ALTERNATIVES
701 East Carson Street
1. DO NOT APPROVE the above recommendations. However, staff will not be able to proceed with the construction of the project.
2. TAKE another action the City Council deems appropriate, consistent with the requirements of the law.
IV. BACKGROUND
Project No. 1756: Figueroa Street Improvement Project, covering Figueroa Street from Carson Street to Lomita Boulevard is included in the City’s Capital Improvements Program (CIP). This project is programmed for FY 2024/25 and the estimated construction cost is $8,000,000.00.
Project No. 1756 includes the removal and replacement of roadway pavement sections, grinding and overlaying existing asphalt pavement, and addressing the necessary concrete work. It involves removal and replacement of damaged sidewalks, driveway approaches, curbs, gutters, and access ramps, as well as tree removals and replacements. The required concrete improvements will restore these elements to city standards and ensure compliance with the Americans with Disabilities Act (ADA).
The city retained the services of an on-call consultant Tait & Associates, Inc to complete the work for PS&E for this project. The plans and specifications for Project No. 1756 have been completed by the Engineering Services Division of the Public Works Department and are now ready to be advertised for construction bids.
Based on California Environmental Quality Act (CEQA) guidelines, the proposed project is categorically exempt according to the following:
Section 15301 of the CEQA includes the type of existing facilities projects that are categorically exempt. The following sections applies:
Section 15301 (a): Interior or exterior alterations involving such things as interior partitions, plumbing, and electrical conveyances.
Section 15301 (b): Existing facilities of both investor and publicly owned utilities used to provide electric power, natural gas, sewerage, or other public utility services.
It is requested that the City Council authorize staff to advertise the project for construction bids, and to record the Notice of Exemption to satisfy the California Environmental Quality Act’s requirements.
V. FISCAL IMPACT
The PS&E scope of work was funded in the current fiscal year budget. However, the remaining project construction phase is currently unfunded. Staff is preparing to move this project forward in FY2025-26 once funding has been identified.
VI. EXHIBITS
1. Location Map
2. Plans, Specifications, and Estimate
3. Notice of Exemption
Prepared by: Gilbert Marquez, P.E., City Engineer; Jesus Sanchez, P.E. , Senior Civil Engineer
Attachments
Exhibit 01_Figueroa Street Location Map.pdf
Exhibit 02_PS&E.pdf
Exhibit 03_CEQA Notice of Exemption_Project 1756_Figueroa Street Improvement Project.pdf Location Map
Project No.1756
FY 2024/2025
Figueroa Street
Street Improvement Project Carson Street to Lomita Blvd.
City of Carson
¯
1 CITY OF CARSON
LOS ANGELES COUNTY, CALIFORNIA
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
PROJECT NO. 1756:
Figueroa Street Improvements from Carson Street to Lomita Boulevard IFB-24-13
Bids must be submitted electronically using PLANET BIDS by 3:00 PM on _____________________
2 CITY OF CARSON
LOS ANGELES COUNTY, CALIFORNIA
BID DOCUMENTS
CONTRACT DOCUMENTS
SPECIFICATIONS AND STANDARD DRAWINGS
FOR
PROJECT NO. 1756
Figueroa Street Improvements from Carson Street to Lomita Boulevard IFB-24-13
Prepared by
Jesus Sanchez
Public Works Department
Gilbert Marquez, P.E., C -58567 DATE 07.10.2024
Principal Civil Engineer/
City Engineer
3 LOCATION MAP
PROJECT NO. 1756
Figueroa Street Improvements from Carson Street to Lomita Boulevard Project Name/No.: 1756 Contract No.: __________ Project Manager: Jesus Sanchez Approved: ______________ 4 TABLE OF CONTENTS
Page No.
COVER SHEET........................................................................................................... 1 TITLE SHEET ............................................................................................................. 2 LOCATION MAP........................................................................................................ 3 TABLE OF CONTENTS............................................................................................. 4 INVITATION FOR BIDS ........................................................................................... 6 INSTRUCTIONS TO BIDDERS ................................................................................ 10 BID DOCUMENTS.................................................................................................... 23 Bid Letter & Bid Schedule......................................................................... 24 Schedule of Bid Items ................................................................................ 27 Bidder's Declaration................................................................................... 28 Equal Opportunity Certification................................................................. 30 Public Contract Code 102851.1, 10162, 10232 ......................................... 31 Noncollusion Affidavit .............................................................................. 32 Bid Bond .................................................................................................... 33 Designation of Subcontractors ................................................................... 35 Construction Project Reference ................................................................. 37 Bidder's Assurance..................................................................................... 39 Certificate of Non-Discrimination by Contractors..................................... 40 Project Labor Agreement - Letter of Assent.............................................. 41 Cal/OSHA Certification............................................................................. 42
FAIR EMPLOYMENT PRACTICES DOCUMENTS ............................................... 44 CONTRACT DOCUMENTS ...................................................................................... 51 Public Works Agreement ........................................................................... 52 Exhibit A (Contractor’s Bid)................................................................... 81 Exhibit B (Special Requirements)........................................................... 82 Exhibit C (Faithful Performance Bond).................................................. 83 Exhibit D (Labor and Material Bond/Payment Bond) Workers' Compensation Insurance Certificate (Exhibit A-1) .................... 87 Indemnification and Hold Harmless Agreement and Waiver Of Subrogation and Contribution.............................................................. 88 Exhibits ......................................................................................................
A - Evidence of Insurance....................................................................... 89 B - Comprehensive Liability................................................................... 92 C - Automobile Liability......................................................................... 94 D - Worker’s Compensation ................................................................... 96 E - Excess Liability Insurance ................................................................... 98 5 SPECIAL PROVISIONS ........................................................................................... SP-1 – SP 26 TECHNICAL PROVISIONS ..................................................................................... TP-1 – TP36 APPENDICES ........................................................................................................... A (PROJECT DRAWINGS – Not Numbered)
6 CITY OF CARSON
701 EAST CARSON STREET
CARSON, CALIFORNIA 90745
INVITATION FOR BIDS
FOR PROJECT NO. 1756 IFB-24-13
NOTICE IS HEREBY GIVEN THAT THE Purchasing Manager of the City of Carson will receive sealed bids for:
PROJECT NO.: PW
1756
TITLE: Figueroa Street Improvements from Carson Street to Lomita Boulevard BIDS MUST BE SUBMITTED ELECTRONICALLY USING PLANET BIDS. TO
ACCESS AND REGISTER FOR THIS BID, PLEASE VISIT
https://www.planetbids.com/portal/portal.cfm?CompanyID=32461 Optional Pre-Bid Conference/Job Walk: 08/08/2024, 9:00 AM Prospective Contractor Questions Due: 08/20/2024, 2:00 PM Bids Due: 09/05/2023, 3:00 PM
BID RESULTS: At the time designated for receiving sealed bids on said project, the bids will be publicly opened and read aloud at the Office of the City Clerk, City Hall, 701 East Carson Street, Carson, California 90745.
OBTAINING BID AND CONTRACT DOCUMENTS: Plans and Specifications are available on planet bids at
https://pbsystem.planetbids.com/portal/32461/portal-home.
BID GUARANTY: Bids must be accompanied by cash, or by cashier's or certified check made payable to the City of Carson, or by a bid bond executed by an admitted surety insurer on the bond form provided herein, in the amount not less than ten percent (10%) of the total bid submitted, made payable to the City of Carson as a guarantee that the bidder, whose bid is accepted, will promptly execute the contract, secure payment of workers’ compensation insurance, and furnish a satisfactory faithful performance bond in the amount of one hundred percent (100%) of the total bid price and a payment bond (labor and material bond) in the amount of one hundred percent (100%) of the total bid price which complies with all of the requirements of Civil Code Section 9554.
LIQUIDATED DAMAGES: Liquidated damages of $1,000/day will apply to this project. See Special Provisions for detailed information on liquidated damages.
RETENTION: The City will deduct a five percent (5%) retention from all progress payments as specified in Section 7-3 of the Standard Specifications for Public Works Construction. The City in accordance with Public Contract Code Section 22300 shall permit the substitution of securities for 7 any moneys withheld by a public agency to ensure performance under a contract. The City hereby incorporates herein all of the provisions set forth in Public Contract Code Sect. 22300.
The Contractor may, at Contractor's sole cost and expense, substitute securities equivalent to any monies withheld by the Owner to insure performance under the contract. Such security shall be deposited with the Owner or a state or federally chartered bank as escrow agent, who shall pay such monies to the Contractor upon satisfactory completion of the Contract. The Contractor shall be the beneficial owner of any security substituted for monies withheld and shall receive any accrued interest thereon. Securities eligible for investment shall include those listed in Government Code Section 16430 or bank or savings and loan certificates of deposit. No such substitution shall be accepted until the escrow agreement, letter of credit, form of security and any other document related to said substitution is reviewed and found acceptable by the Owner's Attorney.
STATE LABOR STANDARDS, WAGE, AND CONTRACTOR REGISTRATION REQUIREMENTS; FEDERAL PREVAILING WAGE: Contractor shall comply with the requirements of SB 854. SB 854 requires all contractors bidding on public works projects to register with the DIR and to pay an annual fee. SB 854 requires that contractors and subcontractors must register in order to submit a bid and be awarded a contract. Bidders are advised that this Contract is a public work for purpose of the California Labor Code, which requires payment of prevailing wages. In entering into a public works contract, or a subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor and all subcontractors agree to follow the State Labor standards. State Labor standards provisions, including prevailing wage requirements, will be enforced such that the general rate of per diem wages (prevailing wage) shall be paid for each craft, classification, or type of worker needed to execute the contract to all workers employed in the execution of the contract. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement). The State General Prevailing Wage Determination is as established by the California Department of Industrial Relations (available at http://www.dir.ca.gov/DLSR/PWD/index.htm). The prevailing rate of per diem wages are on file at the City of Carson, Department of Public Works – Engineering, 701 E. Carson Street, Carson, California 90745, and are available to any interested party on request. The project is subject to compliance monitoring by the Department of Industrial Relations.
Contractor shall also cause a copy of the determination of the DIR Director of the prevailing rate of per diem wages to be posted at each job site.
This project is partially funded with federal funds. As such, all contracts including those with subcontractors, entered into pursuant to this notice shall comply with the Davis-Bacon Fair Labor Standards Act (40 U.S.C. Section 3141 et seq), and the implementation regulations issued pursuant thereto (29 C.F.R. Section 1, 3, and 5) and any amendments thereof. In the event there is a conflict between the amount of prevailing wages to be paid between state and federal laws, the contractor and all subcontractors shall pay not less than the higher wage rate.
EMPLOYMENT OF APPRENTICES: Attention is directed to the provisions in Sections 1777.5 and 1777.6 of the California Labor Code concerning employment of apprentices by the Contractor, or any Subcontractor under the Contractor. The Contractor, and any Subcontractor under the Contractor, shall comply with the requirements of said sections in the employment of apprentices; 8 however, the Contractor shall have full responsibility for compliance with said Labor Code sections for all apprenticeable occupations, regardless of any other contractual or employment relationships alleged to exist.
AWARD OF CONTRACT: Each contractor and subcontractor listed on the bid must be registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5, subject to the limited exceptions set forth in Labor Code Section 1771.1(a) (regarding the submission of a bid as authorized by Business &Professions Code Section 7029.1 or Public Contract Code Section 10164 or 20103.5, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded).
SUBCONTRACTOR'S LIST: Bidder understands that if he or she fails to specify a subcontractor for any portion of the work to be performed under the contract, he or she shall be deemed to have agreed to perform such portion himself and that he or she shall not be permitted to sublet or subcontract that portion of the work except in cases of public emergency or necessity.
In compliance with the provisions of Section 4100 through 4113 of the Public Contract Code of the State of the California and any amendments thereto, and Title 49, Section 26.11 of the Code of Federal Regulations, the undersigned bidder has set forth on the form provided therefor, the name and location of the place of business of each subcontractor, the California contractor license
number, and public works contractor registration number issued pursuant to Section 1725.5 of the Labor Code,
who will perform work or labor or render services to the prime contractor, in or about the construction of or improvements to be performed, under the contract documents to which the attached bid is responsive including special fabrication and installation, and the portion of the work which will be done by each subcontractor for each subcontract in an amount in excess of one-half
(1/2) of one percent (1%) of the prime contractor’s total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half (1/2) of one percent
(1%) of the prime contractor's total bid or $10,000, whichever is greater. Additionally, once a subcontractor has been listed in the bid, another subcontractor may not be substituted unless the appropriate statutory procedure is followed and the City consents to the substitution, or as otherwise allowed under law.
CONTRACTOR’S LICENSE: At the time of “Award of the Contract”, the Prime Contractor must have a valid California State Contractor's License with a classification of “A” in accordance with provisions of Chapter 9, Division 3, of the Business and Professions Code of the State of California and the Prime Contractor shall warrant that it and all subcontractors are properly licensed, which includes each entity having a City business license.
CITY’S RIGHTS RESERVED: The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received. The award, if made, will be made to the lowest responsible bidder.
ENHANCED ELECTRICAL SAFETY POLICY: Bidders are advised that all work on this project shall be conducted in compliance with the requirements in the Enhanced Electrical Safety Policy adopted by the City on February 1, 2011, which are included in the Special Provisions, and made part of, the Contract Documents for this project.
PROJECT LABOR AGREEMENT (PLA): To be responsive to this Notice, Bids for this project must be presented taking into account the requirements of the current Project Labor 9 Agreement in effect for certain projects in the City of Carson which is included in the Special Provisions, and made part of, the Bid and Contract Documents for this project.
All interested bidders are advised that the scope of work or a portion thereof that is the subject of this Invitation for Bids is covered by the City's master Project Labor Agreement ("PLA"). The successful contracting party, and all of its subcontractors, shall have the obligation to comply with all of the terms of the PLA for all portions of the work which are subject to the PLA. A copy of the PLA is attached to the project specifications and incorporated. The successful contracting party, and all of its subcontractors, will be required, as a condition of being awarded an agreement, to deliver an executed letter of assent (as shown in PLA Attachment A) to the City concurrently with the submittal of its bid and again concurrently with execution of any agreement and prior to the issuance of any notice to proceed. Failure to provide the same shall be grounds for deeming the bid non-responsive and/or for summary termination of any agreement or for award of the agreement to some other bidder.
CARSON ONE-STOP CAREER CENTER: To the greatest extent feasible, the successor contracting party shall endeavor to employ residents of the City of Carson in the construction of the improvements required by the contract. All solicitations for employment arising in whole or in part out of performance of the contract, whether full- or part-time, new or replacement hires, shall be listed with the Carson One Stop Career Center. To list employment opportunities, contact the Carson One-Stop Career Center at (310) 680 -3870 or in person (by appointment only) at 801 E.
Carson Street, Suite 117, Carson, CA 90745.
DIVERSION OF RECYCLABLE WASTE MATERIALS : In support of the City’s waste reduction and recycling efforts, the selected contractor will be required to divert all Recyclable Waste Materials to appropriate recycling centers rather than area landfills. For purposes of this requirement, Recyclable Waste Materials shall include asphalt, concrete, brick, concrete block and rock. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests. All costs incurred for these waste diversion efforts shall be included as part of each Bidder’s Total Bid Price.
CAL/OSHA: All bidders shall submit certifications that they have provided all required and necessary safety training to their employees related to the equipment to be utilized and work contemplated as described in this Invitation for Bids, and that all employees are familiar with the safety regulations pertaining to the work, in compliance with any and all Cal/OSHA regulations and mandates. Bids omitting such certification shall be deemed non-responsive.
BID QUESTIONS: All bid questions shall be submitted online through Planet Bids by the due date and time listed on the Invitation for Bids. The City will coordinate responses and post them to Planet Bids by five (5) calendar days prior to the bid deadline for all interested proposers to review. Proposers are not to contact City personnel or Elected Officials with any questions or clarifications concerning this Invitation for Bids other than through Planet Bids. Any City response for this IFB that is not posted through Planet Bids is unauthorized and will be considered invalid.
DATED THIS 1st DAY OF AUGUST 2024.
JOSILLA TOGIOLA
PURCHASING MANAGER
10 TABLE OF CONTENTS
FOR
INSTRUCTIONS TO BIDDERS
1. AVAILABILITY OF BID DOCUMENTS
2. EXAMINATION OF BID DOCUMENTS
3. INTERPRETATION OF BID DOCUMENTS
4. INSPECTION OF SITE: PRE-BID CONFERENCE AND JOB WALK
5. ADDENDA
6. PREPARATION OF BIDS
7. MODIFICATIONS OF BIDS
8. SIGNING OF BIDS
9. BID GUARANTEE (BOND)
10. SUBMISSIONS OF SEALED BIDS
11. DELIVERY, OPENING OF BIDS, DISCREPANCIES IN BIDS
12. BID DOCUMENTS
13. WITHDRAWAL OF BID
14. AWARD PROCESS / COMPETENCY OF BIDDERS
15. DESIGNATION OF SUBCONTRACTORS
16. LICENSED REQUIREMENTS
17. DISQUALIFICATIONS OF BIDDERS; INTEREST IN MORE THAN ONE BID
18. INSURANCE REQUIREMENTS
19. REQUIRED BIDDER CERTIFICATIONS AND NOTARIZATIONS
20. BASIS OF AWARD; BALANCED BIDS
21. FILING OF BID PROTESTS
22. PERFORMANCE BOND AND PAYMENT BOND REQUIREMENTS
23. BIDDER PRE-QUALIFICATION
24. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES
25. EXECUTION OF CONTRACT
26. CITY’S RIGHTS
27. BIDDER’S RESPONSIVENESS
28. BIDDER’S RESPONSIVENESS CHECKLIST
29. CONTRACT BID FORMS; LISTS OF SUBCONTRACTORS
30. RESPONSIBILITY CRITERIA
31. ADDITIONAL REQUIREMENTS
32. FAIR EMPLOYMENT PRACTICES DOCUMENTS
33. CONTRACT DOCUMENTS
11 INSTRUCTIONS TO BIDDERS
All Bids must be made in accordance with these Instructions to Bidders.
1. AVAILABILITY OF BID DOCUMENTS
Bids must be submitted to the City on the Contract Bid Forms, which are a part of the Bid Package for the Project. Bid Documents may be obtained from the City at the location(s) and at the time(s) indicated in the Invitation for Bids. Prospective bidders are encouraged to telephone in advance to determine the availability of Bid Documents. Any applicable charges for the Bid Documents are outlined in the Invitation for Bids.
The City may also make the Bid Documents available for review in one or more plan rooms. Please Note: Prospective bidders who choose to review the Bid Documents in a plan room must contact the City to purchase the required Bid Documents if they decide to submit a bid for the Project.
2. EXAMINATION OF BID DOCUMENTS
The City has made copies of the Bid Documents available, as indicated above. Bidders shall be solely responsible for examining the Project Site and the Bid Documents, including any Addenda issued during the bidding period, and for informing itself with respect to local labor availability, means of transportation, necessity for security, laws and codes, local permit requirements, wage scales, local tax structure, contractors' licensing requirements, availability of required insurance, and other factors that could affect the Work. Bidders are responsible for consulting the standards referenced in the Contract. Failure of Bidder to so examine and inform itself shall be at its sole risk, and no relief for error or omission will be given except as required under State law.
3. INTERPRETATION OF BID DOCUMENTS
Any request for an interpretation or clarification of the Bid Documents must be submitted online through Planet Bids within the date and time specified. Proposers are not to contact City personnel or Elected Officials with any questions or clarifications concerning this IFB other than through Planet Bids. Any City response for this IFB that is not posted through Planet Bids is unauthorized and will be considered invalid. Any response that the City may choose to make for purposes of interpretation or clarification will be made available online via Planet Bids. Bidders’ inquiries must be received by Tuesday, August 20, 2024 at 2:00 PM . Where such interpretation or clarification requires a change in the Bid Documents, the City will prepare and issue an Addendum to the Bid Documents. The City shall not be bound by, and Bidder shall not rely upon, any oral interpretation or clarification of the Bid Documents. The bid process and terms and conditions will be in accordance with the Bid Documents herein stated above and the following:
a. Bid Letter & Bidding Schedule(s)
b. Schedule of Bid Items
c. Bidder’s Declaration
12 d. Non-Collusion Affidavit
e. Equal Employment Opportunity Certification
f. Public Contract Code Section 10162 Questionnaire and Sections 10232 and 10285.1 Statements
g. Bid Bond
h. Designation of Subcontractors
i. Construction Project Reference
j. Bidder’s Assurance
k. Certificate of Non-Discrimination by Contractors
l. Project Labor Agreement – Letter of Assent
m. Cal/OSHA Certification
n. Addenda(s) (if any issued by the City)
4. INSPECTION OF SITE; PRE-BID CONFERENCE AND JOB WALK
OPTIONAL JOB WALK: August 8, 2024 at 09:00AM
LOCATION: Figueroa Street and Sepulveda Boulevard, Carson, CA 90745 Each prospective bidder is responsible for fully acquainting themselves with the conditions of the Project Site, as well as those relating to the construction and labor of the Project, to fully understand the facilities, difficulties and restrictions, which may impact the total and adequate completion of the Project. Each prospective bidder is also responsible for conducting a walkthrough and for removal of any hazards that the City and bidders noticed or observed on the worksite.
Contractor shall monitor weather forecasts for adverse weather conditions that may impact the project and provide site and facilities protection due to unforeseen weather conditions during the course of the contract. Cost of this protection is included in the bid items.
Upon receiving the Notice to Proceed, the Contractor is required to provide proof of order that any long lead items have been ordered. Items that require long lead time shall be those that require 75 days or more to obtain, and determination of which items require long lead times shall be made solely by City. Proof of purchase must include confirmation and expected delivery date.
Electrical Equipment, Mechanical Equipment and other long lead time items, if any, are required to be stored and protected at a location agreed to by the City and the Contractor, to allow delivery confirmation inspection by the City and Project Manager.
5. ADDENDA
The City reserves the right to revise the Bid Documents prior to the bid opening date.
Revisions, if any, shall be made by written Addenda. Pursuant to Public Contract Code Section 4104.5, if the City issues an Addendum later than 72 hours prior to the deadline for submission of bids, and the Addendum requires material changes, additions or deletions to the description of the work to be performed or the content, form or manner of submission 13 of bids, the City will extend the deadline for submission of bids by at least 72 hours.
Otherwise, the City may determine, in its sole discretion, whether an Addendum requires that the date set for opening bids be postponed.
The announcement of the new date, if any, shall be made by Addenda. Each prospective bidder shall provide the City a name, address and facsimile number to which Bid Document Addenda may be sent, as well as a telephone number by which the City can contact the Bidder. Copies of Addenda will be submitted electronically through Planet Bids without charge to any parties who have obtained a copy of the Bid Documents and provided such current information. Please Note: Bidders are primarily and ultimately responsible for ensuring that they have received any and all Addenda. To this end, each Bidder should contact the Engineering Services Division to verify that he has received all Addenda issued, if any.
Bidders must acknowledge receipt of all Addenda, if any, in its Bid Letter. Failure to acknowledge receipt of all Addenda may cause its Bid to be deemed incomplete and non- responsive.
6. PREPARATION OF BIDS
Bids shall be prepared only using copies of the Contract Bid Forms provided with the Bid Documents. The use of substitute bid forms other than clear and correct photocopies of those provided by the City will not be permitted and may result in the Bid being declared non responsive. Bids shall be executed by an authorized signatory as described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces (including inserting "N/A" where applicable) and initial all interlineations, alterations, or erasures to the Contract Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the Contract Bid Forms nor make substitutions thereon. USE OF INK, INDELIBLE PENCIL OR A TYPEWRITER IS REQUIRED.
7. MODIFICATIONS OF BIDS
Each Bidder shall submit its Bid in strict conformity with the requirements of the Bid Documents. Each Bid prepared by Bidder shall be complete in itself and shall be submitted electronically through Planet Bids.
Unauthorized conditions, limitations, exclusions or provisions attached to a Bid will render it nonresponsive and may cause its rejection. Bidders shall neither delete, modify, nor supplement the printed matter on the Contract Bid Forms, nor make substitutions thereon.
ORAL, TELEPHONIC AND FACSIMILE BIDS OR MODIFICATIONS WILL NOT BE CONSIDERED.
8. SIGNING OF BIDS
All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders will be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom. 14 If a Bidder is a joint venture or partnership, it will be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid; and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom. The Bid shall be executed by the designation joint venturer or partner on behalf of the joint venture or partnership in its legal name. All signatures on Powers of Attorney must be witnessed by a notary.
9. BID GUARANTEE (BOND)
Each bid shall be accompanied by cash, a certified or cashier's check, bid bond (the bid bond must be submitted on the form included in these Bid Documents) or equivalent substitution in lieu of a bond, as authorized by Code of Civil Procedure Section 995.710, in an amount not less than 10% of the Total Bid Price. Any check, bond, or other substitute must be made payable to the City of Carson and shall be given as a guarantee that the Bidder will enter into the Contract described in the Bid Documents if awarded the work and will provide a satisfactory Performance Bond, Payment Bond, the required insurance certificates and endorsements, and any other certifications as may be required by the Contract. By submitting a bid, each bidder agrees that its failure to enter the Contract if awarded the work or to provide the Bonds and other information or documentation described above would result in damage to the City, and that it would be impracticable or extremely difficult to ascertain the actual amount of that damage. For this reason, each bidder agrees that the City may retain the bid guarantee as liquidated damages if the bidder is awarded the work but fails or refuses to timely enter into the Contract or to provide the Bonds and other information or documentation described above, except as may otherwise be required by California law.
If electing to provide a Bid Bond, as set forth above, each Bidder must obtain such a bond from an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. In addition, the Bid Bond must be submitted on the form furnished by the City, or one substantially in conformance with the City's form if previously approved in writing by the City.
Certified or cashier's checks must be drawn on a solvent state bank or a California branch of a solvent national bank.
After the City has made an award to the successful Bidder, and the Bidder has signed a Contract, submitted the necessary bonds, original insurance certificates and endorsements, and any other certifications as may be required by the Contract, the remaining Bid guarantees shall be returned to each particular bidder if requested by that bidder. If the City rejects all Bids, it will promptly return to all Bidders their Bid guarantees.
10. SUBMISSIONS OF SEALED BIDS
Once the Bid and supporting documents herein have been completed and signed as set forth above, they shall be uploaded, along with the Bid Guarantee and any proposed sketches 15 and brochures or other materials required by these instructions, onto Planet Bids as indicated in the Invitation for bids. NO ORAL, TELEPHONIC OR FACSIMILE FORMS WILL BE CONSIDERED.
No consideration shall be given by the City to bids received after the date and time set for the opening of bids as provided in the Invitation for Bids except to the extent such date and time are extended via addenda.
11. DELIVERY, OPENING OF BIDS, DISCREPANCIES IN BIDS
Bids will be received by the City via Planet Bids shown in the Invitation for Bids up to the date and time shown therein. The City will leave unopened any Bid received after the specified date and time, and any such unopened Bid will be returned to Bidder (where hardcopies are submitted too). It is the Bidder's sole responsibility to ensure that its Bid is received as stipulated. Bids may be submitted earlier than the dates(s) and time(s) indicated.
Bids will be opened at the date and time stated in the Invitation for Bids unless such date and time are extended via addenda, and then reviewed by City. The City reserves the right to reject any or all Bids, to waive any informality or irregularity in any Bid received where such waiver is in the best interests of the City, and to be the sole judge of the merits of the respective Bids received including for responsiveness and determination of Bidder’s responsibility.
In the event there is more than one bid item in a Bidding Schedule, the bidder shall furnish a price for all bid items in the Schedule, and failure to do so will render the Bid non- responsive and may cause it to be rejected by the City. The bidder shall state alphanumerically the unit prices or the specific sums as the case may be, for which it proposes to supply the labor, materials, supplies, or machinery, and completely perform the Contract. The total amount of each item bid and the total amount of the bid shall be stated alphanumerically as well.
If the unit price and the total amount named by a bidder for any items are not in agreement, the unit price alone, will be considered as representing the bidder's intention and the total will be corrected to conform thereto.
12. BID DOCUMENTS
All Bids shall include the following executed documents to be submitted with each bid:
Bid Letter & Bidding Schedule(s)
Schedule of Bid Items
Bidder's Declaration
Non-Collusion Affidavit
Equal Opportunity Certification
Public Contract Code Section10162 Questionnaire and Sections10232 and 10285.1 Statements
Bid Bond
Designation of Subcontractors
Construction Project Reference
Bidder's Assurance
16 Certificate of Non-Discrimination by Contractors
Project Labor Agreement Letter of Assent
Cal/OSHA Certification
Any Addenda Issued by the City
13. WITHDRAWAL OF BID
Electronic Bids are sealed and cannot be viewed by the City until the closing date and time.
If you need to withdraw your bid, you may do so any time before the bid deadline, by going to the Planet Bids website and selecting “withdraw”. No bid may be withdrawn after the time set for opening of bids.
14. AWARD PROCESS / COMPETENCY OF BIDDERS
After the Bids have been opened, they will be checked for accuracy and compliance with all provisions as specified herein.
The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received including for responsiveness and determination of Bidder’s responsibility.
The award, if made, will be made within ninety (90) days after the opening of the bids, provided that the award may be made after said period if the successful bidder shall not have given the City written notice of the withdrawal of his or her bid.
Award will be made to the lowest responsive and responsible bidder.
In selecting the lowest responsive and responsible bidder, consideration will be given not only to the financial standing but also to the general competency of the bidder for the performance of the work covered by the plans and specifications. To this end, each bid shall be supported by a statement of the bidder's experience on the form entitled "Construction Project Reference” bound herein. A bidder may be required to present evidence that he has successfully performed similar work of comparable magnitude or submit other evidence satisfactory to the City that he or his associates are personally competent to manage the proposed undertaking and to carry it forward to a successful conclusion.
No bid will be awarded to a Contractor who, at the time of the bid opening and “Award of the Contract,” is not licensed in accordance with the laws of the State of California under applicable provisions of the Business and Professions Code or to a Contractor who has failed to demonstrate the attributes of trustworthiness, quality, fitness, capacity and experience to satisfactorily and fully perform under the public works contract. The Contractor shall include the Contractor's license number, license classification, and license expiration date on the form furnished herein entitled "Construction Project Reference.” The licensing requirements for Contractors shall apply also to Subcontractors. In addition, any contractor or subcontractor who is ineligible under Lab C §§1777.1 and 1777.7 is prohibited from working on this Project.
Only manufacturers or contractors of established reputation or their duly authorized dealers or agents, having proper facilities for the manufacture of the materials or equipment and for 17 servicing same, or for proper execution of the work called for in the contract, will be considered in making the award.
15. DESIGNATION OF SUBCONTRACTORS
Pursuant to both state and federal law, the Bidders must designate the name, location of the place of business, the California contractor license number, and the public works contractor registration number issued pursuant to Section 1725.5 of the Labor Code and Title 49, Section 26.11 of the Code of Federal Regulations, of each subcontractor who will perform work or render services for the prime Bidder in an amount that exceeds one-half of one percent (0.5%) of the Bidder's Total Bid Price, as well as the portion of work each such subcontractor will perform. Bidders must make these designations, as well as any others requested by the City, on the document titled "List of Proposed Subcontractors" which has been included with the Contract Bid Forms. Pursuant to Public Contract Code Section 4104, the City has determined that it will allow Bidders twenty-four (24) additional hours after the deadline for submission of bids to submit the information requested by the City about each subcontractor, other than the name, license number, DIR registration number, and location of each subcontractor.
16. LICENSE REQUIREMENTS
Pursuant to Section 7028.15 of the Business and Professions Code and Section 3300 of the Public Contract Code, all bidders must possess proper licenses for performance of this Contract. Subcontractors must possess the appropriate licenses for each specialty subcontracted. Pursuant to Section 7028.5 of the Business and Professions Code, the City shall consider any bid submitted by a contractor not currently licensed in accordance with state law and pursuant to the requirements found in the Bid Documents to be non- responsive, and the City shall reject the Bid. The City shall have the right to request, and the Bidders shall provide within five (5) Calendar Days, evidence satisfactory to the City of all valid license(s) currently held by that Bidder and each of the Bidder's subcontractors, before awarding the Contract.
17. DISQUALIFICATIONS OF BIDDERS; INTEREST IN MORE THAN ONE BID No bidder shall be allowed to make, submit or be interested in more than one bid. However, a person, firm, corporation or other entity that has submitted a sub bid to a bidder, or that has quoted prices of materials to a bidder, is not thereby disqualified from submitting a sub bid or quoting prices to other bidders submitting a bid to the City.
More than one bid from an individual, firm, partnership, corporation, or association under the same or different names will not be considered. Reasonable grounds for believing that any bidder is interested in more than one bid for the work contemplated will cause the rejection of all bids in which such bidder is interested. If there is reason for believing that collusion exists among the bidders, all bids will be rejected and none of the participants in such collusion will be considered in future bids. Similarly, failure to comply with the registration requirements of Labor Code Section 1725.5, as further described in the Invitation for Bids, will disqualify a Bidder.
18 18. INSURANCE REQUIREMENTS
Within the time specified in these Instructions to Bidders above, Bidder shall provide the City with four identical counterparts of all required insurance certificates and endorsements as specified in the Bid Documents. Failure to do so may, in the sole discretion of City, result in the forfeiture of the Bid Guarantee. All insurance is to be placed with insurers with a current A.M. Best rating of no less than A:VIII, licensed to do business in California, and satisfactory to the City.
19. REQUIRED BIDDER CERTIFICATIONS AND NOTARIZATIONS
Bidders must comply with the following:
A. BIDDER CERTIFICATIONS:
a. Bid Documents
i. Bid forms
ii. Bidder’s Declaration
iii. Equal Opportunity Certification
iv. Public Contract Code Section 10162 Questionnaire and Sections 10232 and 10285.1 Statements
v. Construction Project References
vi. Bidder’s Assurance
vii. Certificate of Non-Discrimination by Contractors
viii. Project Labor Agreement Letter of Assent
ix. Cal/OSHA Certification
x. Addenda (if any issued by the City)
b. Contract Documents
i. None
B. BIDDER NOTARIZATIONS
a. Bid Documents
i. Non-collusion affidavit (per Public Contract Code Section 7106) ii. Bid bond
iii. Power of Attorney (if any)
b. Contract Documents
i. Payment bond
ii. Performance bond
20. BASIS OF AWARD; BALANCED BIDS
The City reserves the right to reject any or all Bids. Without limiting the generality of the foregoing, the City may reject any Bid which, in its opinion when compared to other bids received or to the City’s internal estimates, does not accurately reflect the cost to perform the Work. Each Bidder must ensure that each bid item contains a proportionate share of profit, overhead and other costs or expenses, which will be incurred by the Bidder. The City may reject as non-responsive any bid, which unevenly weighs or allocates overhead and profit to one or more particular bid items.
21. FILING OF BID PROTESTS
19 Bidders may file a “protest” of a contract award in accordance with City of Carson Municipal Code Article II, Chapter 6, Section 2613.
22. PERFORMANCE BOND AND PAYMENT BOND REQUIREMENTS
Within the time specified in these Instructions to Bidders above, the Bidder to whom a Contract is awarded shall deliver to the City three identical counterparts of the Performance Bond and Payment Bond in the form supplied by the City and included in the Bid Documents. Failure to do so may, in the sole discretion of City, result in the forfeiture of the Bid Guarantee. The surety supplying the bonds must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City.
The Performance Bond shall be for one hundred percent (100%) of the Total Bid Price, and the Payment Bond shall also be for one hundred percent (100%) of the Total Bid Price.
23. BIDDER PRE-QUALIFICATION
N/A
24. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES No mention shall be made in the bid of Sales Tax, Use Tax, or any other tax, as all amounts bid will be deemed and held to include any such taxes that may be applicable.
Contractor and its subcontractors performing work under this Contract will be required to pay California sales and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the work will be located, unless otherwise expressly provided by the Bid Documents.
25. EXECUTION OF CONTRACT
The bidder to whom award is made shall execute a written contract with the City on the form agreement provided, and shall secure all insurance and bonds as herein provided within fifteen (15) working days from the date of written notice of the award. Failure or refusal to enter into a contract as herein provided, or to conform to any of the stipulated requirements in connection therewith shall be just cause for the annulment of the award and the forfeiture of the bid guaranty.
26. CITY’S RIGHTS
The City may investigate the qualifications of any Bidder under consideration, require confirmation of information furnished by a Bidder, and require additional evidence of qualifications to perform the work described in these Bid Documents. The City reserves the right to:
A. Reject any or all of the Bids if such action is in the best interest of the City.
B. Issue subsequent Invitation for Bids.
C. Cancel this entire Invitation for Bids.
D. Appoint evaluation committees to review any or all Bids. 20 E. Seek the assistance of outside technical experts to validate the Bid(s).
F. Approve or disapprove the use of particular subcontractors.
G. Waive informalities and irregularities in Bids.
H. Evaluate the capability of bidder to successfully fulfill the contract schedule.
The Invitation for Bids does not commit the City to enter into a contract, nor does it obligate the City to pay any costs incurred in preparation and submission of Bids or in anticipation of a contract.
27. BIDDER’S RESPONSIVENESS
The City will evaluate Bids for responsiveness at the time of Bid opening and before award is made. Only Bids which conform in all material respects to the Bid Documents can be eligible for award. A Bid not meeting the requirements of the responsiveness checklist may be rejected immediately upon opening, and returned to the Bidder’s representative.
28. BIDDER’S RESPONSIVENESS CHECKLIST
The City’s initial responsiveness evaluation will consider the following:
a. Completed and properly executed Bid Letter and Bidding Schedule (Including a completed Total Bid Price, completed Bid Bond amount, acknowledged addenda, completed state of incorporation or partner/joint venturer information (if applicable), completed license number, DIR registration number, and signature by authorized company officer; b. Completed Bid Data Forms (including Base Bid Price, Alternate Bid Price if any, valid and properly executed Bid Bond for 10% of the Total Bid Price and completed Lists of Proposed Subcontractors, including Exhibit 12-B, Bidder’s List of Subcontractor (DBE and Non-DBE), of Caltrans’ Local Assistance Procedures Manual for compliance with federal requirements); and
c. Properly executed documents as follows:
i. Non-Collusion Affidavit
ii. Bidder's Declaration
iii. Equal Opportunity Certification
iv. Public Contract Code Section 10162 Questionnaire and Sections 10232 and 10285.1 Statements
v. Construction Project References
vi. Bidder’s Assurance
vii. Certificate of Non-Discrimination by Contractors
viii. Project Labor Agreement Letter of Assent
ix. Cal/OSHA Certification
x. Addenda(s) (if any issued by the City)
If the Bidder is a joint venture, each joint venturer shall prepare and submit a separate form.
Extra forms, if needed, can be obtained from the City, or photocopied by the Bidder, if necessary.
21 29. CONTRACT BID FORMS; LISTS OF SUBCONTRACTORS
a. Contract Bid Forms.
The Bid Letter and Forms must be completed as set forth below. (1) The Contract Bid Forms and Letter must be prepared using ink, indelible pencil or a typewriter.
(2) The Bid Letter must be signed by the Bidder or on its behalf by the person or persons having the authority to do so. Proof of the authority to act on behalf of the firm must be submitted when requested. The proof shall be in the form of a certified copy of an appropriate corporate resolution, certificate of partnership or joint venture, or other appropriate document. If Bidder is an entity made up of multiple parties and no person or persons are designated to act on its behalf, all parties shall execute the Bid. (3) Addenda – Receipt of addenda must be acknowledged in the space provided in the Bid Letter.
(4) The Bidder shall not delete, modify, supplement or make substitutions thereof, on the printed matter of the Contract Bid Forms or Bid Letter. (5) Corrections shall be initiated by the person who signs the Bid Letter. (6) Exceptions or qualifications to the Bid Documents are strictly forbidden.
Any comment by the Bidder which the City determines can be construed as altering the requirements of the specifications or the terms and conditions of the Contract will render the Bid non responsive and disqualify the Bidder from consideration for award.
b. List of Proposed Subcontractors (Forms).
State law prohibits substitution listed in the original Bid except as otherwise provided in Section 4107 and 4107.5 of the California Public Contract Code and applicable case law.
Bidders are required to list all Subcontractors whose participation in the Contract will exceed one-half of one percent (0.5%) of the Total Bid Price. The List of Proposed Subcontractors Forms must be completed as set forth below. (1) Name. List the name of Subcontractors who will perform work in excess of one half of one percent (0.5%) of the Total Bid Price.
(2) Location. For listed Subcontractors, identify the location of its place of business (City and State).
(3) Work. For listed Subcontractors, identify the type/portion of work to be performed in the Contract.
(4) License. For listed Subcontractors, list current valid license number and DIR registration number.
30. RESPONSIBILITY CRITERIA
Responsibility is the apparent ability of the lowest responsive Bidder to meet and complete successfully the requirements of the Contract. The City reserves the right to consider the financial responsibility and general competency of the lowest responsive Bidder, as well as its reputation within the industry. City may request the lowest responsive Bidder to provide 22 a financial statement, audited if necessary, including the Bidder’s latest balance sheet and income statement, to demonstrate that he or she:
a. Has or can secure adequate financial resources to perform the contract; b. Is able to meet the performance or delivery schedule of the contract, taking into consideration other business commitments; and
c. Has a satisfactory record of performance. A contractor seriously deficient in past contract performance, considering the number of contracts and extent of the deficiencies, is presumed not to meet this requirement unless the deficiencies are beyond its control or there is evidence to establish its responsibility notwithstanding the deficiencies. Evidence of such satisfactory performance record should show that the contractor:
i . Has a satisfactory record of integrity in its dealings with government agencies and with subcontractors, and is otherwise qualified to receive an award under applicable laws and regulations; i i . Has the necessary organization, experience, satisfactory safety record, accounting and operational controls and technical skills or the ability to obtain them; and
i i i .Has the necessary production, construction, and technical equipment and facilities or the ability to obtain them.
31. ADDITIONAL REQUIREMENTS
The bidder's attention is directed to the Special Provisions and Technical Provisions bound herein for additional requirements of the Bid and Contract Documents.
32. FAIR EMPLOYMENT PRACTICES DOCUMENTS
Fair Employment Practices Documents are to be submitted by the low bidder within three days following the opening of bids. See enclosed instructions and documents.
33. CONTRACT DOCUMENTS
The following Contract Documents are to be submitted AFTER award of contract:
Agreement
Faithful Performance Bond
Labor and Material Bond (Payment Bond)
Workers' Compensation Insurance Certificate (Exhibit A-1) Indemnification and Hold Harmless Agreement and Waiver of Subrogation and Contribution Evidence of Insurance (COIs and endorsements)
END OF INSTRUCTION TO BIDDERS
23 BID DOCUMENTS
PROJECT NO. 1756:
Figueroa Street Improvements from Carson Street to Lomita Boulevard To Be Submitted
WITH
Bid Package
24 BID
PROJECT NO. : 1756
PROJECT NO. 1756: Figueroa Street Improvements from Carson Street to Lomita Boulevard
BID LETTER (IFB-24-13)
HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
CITY OF CARSON
701 EAST CARSON STREET
CARSON, CALIFORNIA, 90745
Mayor and Council Members:
The undersigned declares that he has carefully examined the location of the proposed work and that he has examined the Plans and Specifications, has read the Contract Documents, and hereby agrees to furnish all labor, materials, equipment, tools, transportation, and services to do all work required for:
CITY’S PROJECT NO.: 1756
TITLE: Figueroa Street Improvements from Carson Street to Lomita Boulevard
in accordance with the Plans and Specifications prepared by the Engineer, in accordance with the Special Provisions and Technical Provisions, the Contract Documents, and in accordance with the Standard Specifications for Public Works Construction (current edition), and the requirements of the Engineer under said documents, for the prices shown herein. All work shall be completed within 90 working days from the date the notice to proceed is issued by the Engineer. 25 BID
BID SCHEDULE – (IFB-24-13)
PROJECT NO. 1756
PROJECT NO. 1756: Figueroa Street Improvements from Carson Street to Lomita Boulevard
ESTIMATEDITEM
NO. DESCRIPTION QUANTITY UNIT UNIT PRICE ITEM COST
1 Bonding, Insurance, and Mobilization
(Carson General Conditions)
1 LS
2 Traffic Control 1 LS
3 Traffic Signs, Stripes, Pavement Markings
& TOMS
1 LS
4 Re-setting Centerline Ties and Permanent
Survey Markers
1 LS
5 Full Width Cold Milling: 2" thickness 794,026 SF
6 Asphalt Rubber Hot Mix (ARHM) 2.0"
Finish Course (Includes Finish Course at
Dig-Outs)
9,925 TON
7 Remove 10" AC & CAB after cold mill
(Dig-Out) and construct 6” [Class B
3/4"PG 64-10] Base Course on 4” CMB
Section
112,355 SF
8 Remove 6" AC Base after cold mill (Dig-
Out) and construct 6” [Class B 3/4"PG 64-
10] Base Course
72,067 SF
9 Weed abate and crack seal existing
surface, and apply Type II Rap Slurry Seal
with 3% latex
124 ELT
10 Remove (Sawcut, remove and haul away
PCC of the existing Access Ramp
including excavation of 4" native /base
and adding & compacting 4" CMB) and
Construct (Construct New PCC Access
Ramps per CALTRANS Standard Plan
A88A and /or Carson Std. Plan No. 124)
Access Curb Ramps
19 EA
11 Furnish and Install Truncated Dome Panel
per CALTRANS Standard Plan A88A and
/or Carson Std. Plan No. 124
14 EA
12 Remove & Replace Sidewalks (or
construct new) including excavation and
adding 4" CMB and adjusting Water
Meters, Pull Boxes, Traffic Signal Boxes,
etc. to Grade
19,988 SF
13 Remove and Replace Commercial
Driveway Approach including Excavation
and Adding Aggregate Base per Carson
Standard Plan
17,500 SF
14 Remove and Replace PCC Curb and
Gutter
8,815 LF
15 Remove Existing Slotted Cross Gutter and
Construct New PCC Cross Gutter
11 EA
26 16
Remove existing Intersection Curb Cut
Island and Construct new ADA Compliant
Intersection Curb
1 EA
17 Remove and Replace Full Depth PCC
Pavement
14,900 SF
18 Remove PCC improvements in back of
driveways on private property and
reconstruct
2,528 SF
19 Remove (3" min. AC at the back of
driveways on private property) and
Reconstruct [Class C 1/2"PG 64-10]
9,000 SF
20 Replace Traffic Loop Detectors 32 EA
21 [DELETABLE] Tree Removal and
Disposal and Stump Grinding
20 EA
22 [DELETABLE] New Tree Installation 20 EA
23 Adjust Manhole or Vault to Grade within
roadway
48 EA
24 Adjust Valve Cover or Utility Box to
Grade within roadway
39 EA
25 Remove and Replace Catch Basin Lid &
Local Depression
3 EA
26 [DELETABLE] Geotextile Fabric and
Macadam Material Removal and Disposal
198,500 SF
27 RR Crossing Protective Liability
Insurance and Flagging Fees
1 LS
28 Unsuitable Material (Unforeseen
Condition)
100 CY
29 Saturated Soil (Unforeseen Condition) 100 CY
30 Allowance 1 LS $50,000.00 $50,000.00
Figures
TOTAL BASE BID AMOUNT*
Words
The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of days indicated in the Invitation for Bids from and after the bid opening date, or until a Contract for the Work is fully executed by the owner and another contractor, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. In case of any discrepancy between the unit price and the extended total, the unit price shall prevail.
Attached hereto is cash, a certified check, a cashier's check, or a bidder's bond in the amount of _______________________________________________________________________Dollars, said amount being not less than 10 percent of the amount bid. Pursuant to Public Contract Code Section 20174, it is agreed a portion equal to the difference between the low bid and bid submitted 27 by the second lowest responsible bidder shall be retained as liquidated damages by the Owner if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance and endorsements within the time provided and Owner awards the Contract to the second lowest responsible bidder. The surplus, if any, shall be returned to the lowest bidder if cash or a check is used, or to the surety on the bidder’s bond if a bond is used. *BID MAY BE REJECTED IF TOTAL IS NOT SHOWN IN FIGURES AND WORDS COMPANY________________________________________________________________ SIGNED_________________________________DATE_____________________________ BID
SCHEDULE OF BID ITEMS
PROJECT NO. 1756
PROJECT NO. 1756: Figueroa Street Improvements from Carson Street to Lomita Boulevard
NOTE:
All amounts and totals in bid sheet will be subject to verification by the City. In case of variation between the unit price and the totals shown by the bidder, the unit price will be considered as the price.
The information given in the bid sheets is supplied to give an indication of the general scope of work but the accuracy of these figures is not guaranteed. It is understood the information given above is solely for the purpose of comparison of bids and the Contractor’s compensation will be computed upon the basis of actual quantities in the complete work, whether they be more or less than those shown herein.
The City has the right to increase or decrease any item in accordance with the Standard Specifications, and also to delete any item from this contract.
The undersigned agrees to execute the contract agreements form and complete the work in every detail as specified in the Contract Documents.
28 BID
PROJECT NO. 1756
BIDDER'S DECLARATION
It is understood and agreed that:
1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Invitation for Bids, the Instructions to Bidders, this Bid, the Bid Bond, the Contract, the Faithful Performance Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.
2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters that can in any way affect the work or the cost thereof.
3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Bid and he further understands that the Owner will not be responsible for any errors or omissions in the preparation of the Bid.
4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.
The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified, and provided all requirements in regard to bonds and insurance have been satisfied and will complete said work within the time specified in the Bidding Schedule.
The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance and endorsements within the period of time specified in the Contract Documents.
5. The undersigned certifies that this Bid is genuine and not a sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding. The undersigned has not in any manner sought by collusion to secure for himself any advantage over any other bidder.
6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The award for such work is to be entirely at the discretion of the Owner after evaluation of the bids as submitted. Pursuant to Public Contract Code Section 20174, the undersigned agrees that the Owner shall retain from the undersigned’s bid security an amount equal to the difference between the low bid and amount of the bid submitted by the second lowest responsible bidder, and the surplus, if any, shall be returned to the lowest bidder in accordance with the provisions of the Public Contract Code Section 20174 in the event of his failure or refusal 29 to execute a Contract and furnish required bonds and insurance therefor within the time provided and Owner awards the Contract to the second lowest responsible bidder.
7. This bid will not be withdrawn within a period of ninety (90) days after the date of its proper opening by the Owner.
8. The undersigned bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.
Respectfully submitted,
_______________________________ ______________________________________ Contractor's Business Name Contractor Title
________________________________ ______________________________________ Business Address: Street By Title
________________________________ ______________________________________ City State Zip Contractor's License No. and Classification ________________________________ ______________________________________ Business Phone Number Date
________________________________ ______________________________________ Name Title Residence: Street
________________________________ ______________________________________ City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the bidder, whose address must be given: if it is made by a firm, it must be signed in the co- partnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each member must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.
30 BID
PROJECT NO. 1756
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
THE BIDDER’S EXECUTION ON THE SIGNATURE PORTION OF THIS
BID SHALL ALSO CONSTITUTE AN ENDORSEMENT AND
EXECUTION OF THOSE CERTIFICATIONS, WHICH ARE A PART OF
THIS BID
The bidder ____, proposed subcontractor _____ hereby certifies that he has ___, has not ___, participated in a previous contract or subcontract subject to the equal opportunity clauses, as required by Executive Orders 10925, 11114, or 11246, and that, where required, he has filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filling requirements.
Note: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts, which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt).
Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.
Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S.
Department of Labor.
31 BID
PROJECT NO. 1756
PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT
In accordance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has ___, has not ___ been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1100, including the Regents of the University of California of the Trustees of the California State University. The term “bidder” is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1
Note: The bidder must place a check mark after “has” or “has not” in one of the blank spaces provided. The above Statement is part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:
Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation?
Yes _____ No _____
If the answer is yes, explain the circumstances in the following space.
PUBLIC CONTRACT SECTION 10232 STATEMENT
In accordance with Public Contract Code Section 10232, the Contractor hereby states under penalty of perjury that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two-year period because of a Contractor’s failure to comply with an order of a federal court which orders the Contractor to comply with an order of the National Labor Relations Board.
Note: The above Statement is part of the Bid. Signing this bid on the signature portion thereof shall also constitute signature of this Statement.
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.
32 BID
PROJECT NO. 1756
NONCOLLUSION AFFIDAVIT
(To be executed by Bidder and submitted with Bid)
State of California
ss
County of Los Angeles
being first duly sworn, deposes and
says that he or she is of
the party making the foregoing bid that the bid is not made in the interest of, or on the behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay fee to any corporation, or agent thereof to effectuate a collusive or sham bid.
NAME OF BIDDER
SIGNATURE OF BIDDER
ADDRESS OF BIDDER
CITY STATE ZIP
ALL SIGNATURES MUST BE WITNESSED BY NOTARY
(attach appropriate jurats)
33 BID
PROJECT NO. 1756
BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT , as Principal,
and , as Surety, are
held firmly bound unto the Owner, consisting of one or both of the following described public entities:
[
X ] The City of Carson, California
[ ] Successor Agency
in the sum of $ ;
DOLLARS,
(not less than ten percent of total amount of bid)
for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, said Principal has submitted a bid to said Owner to perform all work required under the following:
PROJECT NO.:
1756
TITLE: Project 1756: Figueroa Street Improvements from Carson Street to Lomita Boulevard
NOW, THEREFORE, if said Principal is awarded a Contract by said Owner and, within the time and in the manner required in the Specifications for said project, enters into the written form of Contract bound with said Specifications and furnishes the required insurance and bonds, one to guarantee faithful performance and the other to guarantee payment for labor and materials, then this obligation shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this bond by said Owner and judgment is recovered, said Surety shall pay all costs incurred by said Owner in such suit, including a reasonable attorney's fee to be fixed by the court.
SIGNED AND SEALED, this day of , 20 .
(SEAL) (SEAL)
Principal Surety
BY: BY:
Signature Signature
ALL SIGNATURES MUST BE WITNESSED BY NOTARY
34 (attach appropriate jurats)
35 BID
PROJECT NO. 1756
DESIGNATION OF SUBCONTRACTORS
In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100- 4114 of the Public Contract Code of the State of California, and any amendments thereto, and Title 49, Section 26.11 of the Code of Federal Regulations, each bidder shall set forth below the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime contractor's total bid or $10,000, whichever is greater , the subcontractor’s State contractor’s license number, and the subcontractor’s Department of Industrial Relations (DIR) registration number issued pursuant to Section 1725.5 of the Labor Code, as part of the information submitted for that proposed subcontractor, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.
If the contractor fails to specify a subcontractor for any portion of the work to be performed under the contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.
Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the Owner.
LIST OF PROPOSED SUBCONTRACTORS
[“Duplicate Next Page if needed for listing additional subcontractor.”] Name and Address Description of Work
of Subcontractor to be Subcontracted
Name: _______________________________________
Address: _____________________________________
State License Number: __________________________
DIR Registration Number: __________________________
Class ____________________
Portion of Work (%) ________________
36 LIST OF PROPOSED SUBCONTRACTORS CONT’D
Name and Address Description of Work
of Subcontractor to be Subcontracted
Name: _______________________________________
Address: _____________________________________
State License Number: __________________________
Class ____________________
Portion of Work (%) ________________
Name and Address Description of Work
of Subcontractor to be Subcontracted
Name: _______________________________________
Address: _____________________________________
State License Number: __________________________
Class ____________________
Portion of Work (%) ________________
Name and Address Description of Work
of Subcontractor to be Subcontracted
Name: _______________________________________
Address: _____________________________________
State License Number: __________________________
Class ____________________
Portion of Work (%) ________________
37 BID
PROJECT NO. 1756
CONSTRUCTION PROJECT REFERENCE
The bidder is required to supply the following information. (Additional sheets may be attached if necessary.)
In order to more fully evaluate your background and experience for the project herein proposed, it is requested that you submit a list of Public Works and/or similar construction projects completed or in progress within the last 24 months.
Company Name:
Address:
Telephone:
Type of Firm:
(Individual, Partnership, or Corporation)
Contractor's State License Classification ____________ Expiration date______________ Contractor’s DIR No.
Corporate organized under the laws of the State of____________________________________ List the names and addresses of all members of the firm, or names and titles of all officers of the corporation____________________________________________________________ Number of years as a contractor in construction work of this type:
Three projects of this type recently completed:
Project 1
Project Location Contract Amount
Type of Project Date Completed
Contact person Phone Number
Project 2
Project Location Contract Amount
Type of Project Date Completed
38 Contact person Phone Number
Project 3
Project Location Contract Amount
Type of Project Date Completed
Contact person Phone Number
Bidder's Signature
NOTE: If requested by the Owner, the bidder shall furnish a certified financial statement, references, and other information sufficiently comprehensive to permit an appraisal of his current financial condition.
Bidder's Signature
39 BID
PROJECT NO. 1756
BIDDER'S ASSURANCE
FROM:
Name of Bidder:
Business Address:
Telephone No: ( )
TO:
Members of the Owner's Legislative Body
C/o City Hall
City of Carson, California
Members of the Owner's Legislative Body:
Pursuant to your published Invitation for Bids for:
PROJECT NO.:
1756
TITLE: Project 1756: Figueroa Street Improvements from Carson Street to Lomita Boulevard
The undersigned declares that he has carefully examined the location of the proposed work; that he has carefully examined the Plans and Specifications, and read the accompanying Instructions to Bidders; and hereby proposes to furnish all materials, machinery, tools, labor, and services, and do all the work necessary to complete the project in accordance with said Plans and Specifications, and other Contract Documents, at the item prices on the bidding schedule.
BY: TITLE:
40 BID
PROJECT NO. 1756
CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
As suppliers of goods or services to the Owner, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.
We agree specifically:
1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.
2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.
3. To take affirmative steps to hire minority employees within the company.
FIRM
TITLE OF PERSON SIGNING
SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:
41 BID
Project Labor Agreement
Letter of Assent
COMPANY LETTERHEAD
City of Carson
701 East Carson Street
Carson, CA 90745
Attn: City Manager
SUBJECT: PROJECT NO.
Dear City Manager:
This is to confirm that [name of company] agrees to be party to and bound by the City of Carson Project Labor Agreement executed March 4, 2020 (Agreement), as such Agreement may, from time to time, be amended by the negotiating parties or interpreted pursuant to its terms. Such obligation to be a party and bound by this Agreement shall extend to all work covered by the agreement undertaken by this Company on the project and this Company shall require all of its contractors and subcontractors of whatever tier to be similarly bound for all work within the scope of the Agreement by signing and furnishing to you an identical letter of assent prior to their commencement of work.
Sincerely,
(Name of Construction Company)
By:___________________________
(Name and Title of Authorized Executive)
Contractor’s State License No: _______________________________________ Project Name: ______________________________________________________ 42 BID
CAL/OSHA CERTIFICATION
COMPANY LETTERHEAD
City of Carson
701 East Carson Street
Carson, CA 90745
Attn: City Manager
SUBJECT: PROJECT NO.
Dear City Manager:
This is to confirm that [name of company] has provided all required and necessary safety training to its employees related to the equipment to be utilized and work contemplated as described in the Invitation for Bids, and that all employees are familiar with the safety regulations pertaining to the work, in compliance with any and all Cal/OSHA regulations and mandates.
Sincerely,
(Name of Construction Company)
By:___________________________
(Name and Title of Authorized Executive)
Contractor’s State License No: _______________________________________ Project Name: ______________________________________________________ 43 PAGE INTENTIONALLY LEFT BLANK
44 FAIR EMPLOYMENT PRACTICES DOCUMENTS
PROJECT NO. 1756
PROJECT NO. 1756: Figueroa Street Improvements from Carson Street to Lomita Boulevard
To Be Submitted
By The Low Bidder
WITHIN THREE WORKING DAYS FOLLOWING
OPENING OF BIDS
45 FAIR EMPLOYMENT PRACTICES
PROJECT NO. 1756
INSTRUCTIONS
The Fair Employment Practices in Contracts, as adopted by Owner, requires that the Owner not do business with any firm that discriminates against any employee or applicant for employment because of race, color, religion, sex, or national origin.
Accordingly, every contract or subcontract of the Owner in excess of $10,000 for public works, or for goods and services, must be accompanied by a Certificate of Non-Discrimination, obligating the contractor or subcontractor to observe the requirements specified therein.
In addition to the Certificate of Non-Discrimination, the Fair Employment Practices in Contracts also requires that the lowest responsible bidder undertake an affirmative course of action to promote equal employment opportunities and to ensure that employees are treated during employment without regard to their race, color, religion, sex, or national origin. Completion of the attached compliance report will satisfy this requirement. The apparent successful low bidder and each of its subcontractors must submit one copy of the compliance report to the City Engineer, Carson City Hall, 701 East Carson Street, Carson, California 90745, within three days after the opening of bids.
Ref: Resolution No. 83-008 ADOPTED 1/17/83
46 FAIR EMPLOYMENT PRACTICES
PROJECT NO. 1756
CONTRACTOR COMPLIANCE REPORT
This report must be completed by prime contractor and each subcontractor. Complete all items unless otherwise instructed. Use additional sheets if necessary. Submit one copy of the completed report to Owner:
C/o Engineering Services – PMFirstName PMLastName
[email protected]
Public Works Department (PWD)
Carson City Hall
701 East Carson Street
Carson, CA 90745
PART I. FIRM DESCRIPTION
1. Circle one: Prime Contractor Subcontractor
2. Name of Firm:
3 Address:
4. Name and address of principal official or manager:
5. Name and address of home office, if different from above:
6. Person completing this form:
Signature:
Name and Title:
Business Telephone: ( )
Date:
47 PART II: POLICIES AND PRACTICES (Circle proper answer)
1. Yes No Have you informed company officials and representatives regarding the non-discrimination provisions of the Owner's contracts?
2. Yes No Do your solicitations or advertisements for employment specify that you are an equal opportunity employer?
3. Yes No Do you have educational or training programs sponsored or financed for the benefit of employees or prospective employees? If so, please enumerate:
W = White B = Black H = Hispanic A = Asian AI = American Indian M = Male F = Female
4. Yes No Are any apprentices obtained from sources outside the employer's work force? If yes, have you circulated information about apprenticeship openings or opportunities to the following?
Yes No State Employment Offices
Yes No Newspapers or other media
Yes No High schools, including those in minority group areas Yes No Local trade or vocational schools
Yes No Agencies and organizations specializing in minority employment
If there are any apprenticeship programs, please list, along with ethnic breakdown:
JOB CATEGORY TRAINING PROGRAM W B H A AI M F TOTAL
JOB CATEGORY TRAINING PROGRAM W B H A AI M F TOTAL 48 5. Yes No If you are a prime contractor, have all subcontractors covered by these compliance inspection reports been instructed as to their contractual obligations relating to the non-discrimination provisions of the Owner's contracts?
6. Identify (names and addresses) the employment agencies, personnel recruitment organizations, newspaper advertising, or other non-union sources from which the company recruits its personnel.
NAME ADDRESS
7. Yes No Do you have a collective bargaining agreement with a labor union or other organization? If yes, specify the union or organization.
8. Yes No Does your company's collective bargaining agreement or other contract or understanding with a labor union or other working organization include a provision for non-discrimination in employment?
9. Remarks: Use this space for comment on any answers you have supplied. ________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ 49 PART III A: EMPLOYMENT FIGURES (1)
Name of Firm:
Project Name:
Date Form Submitted:
Person Submitting Form:
Check One: Submit separate forms for company makeup (page 22), and for specific project makeup (page 23)
( X ) Permanent makeup of company
( ) Estimated makeup of employees on this specific project only MINORITY GROUPS*
JOB CATEGORIES TOTAL
EMPLOYED
WHITE BLACK HISPANIC ASIAN AMERICAN
INDIAN
M F
OFFICERS & OFFICIALS
PROFESSIONAL (2)
CLERICAL & OFFICE
FIELD SUPERVISOR
SKILLED/SPECIFY
TRADE
A
B
C
D
SEMI-SKILLED (3)
UNSKILLED (4)
TOTAL ITEMS 1-7
(1) This report must be completed by prime contractor and each subcontractor. (2) Occupations requiring college education or equivalent experience: e.g., accountants, architects, scientists, teachers, etc.
(3) Workers who operate equipment or perform factory-type duties of intermediate skill level: e.g., auto attendants, laundry operators, truck drivers, etc.
(4) Works in manual occupations: e.g., laborers performing lifting, digging, mixing or loading operations, etc. * An employee may be included in the minority group in which he/she appears to belong, or is regarded in the community as belonging. Eliciting information as to the racial or ethnic identity of an employee by direct inquiry is not encouraged.
50 PART III B: EMPLOYMENT FIGURES (1)
Name of Firm:
Project Name:
Date Form Submitted:
Person Submitting Form:
Check One: Submit separate forms for company makeup (page 22), and for specific project makeup (page 23)
( ) Permanent makeup of company
( X ) Estimated makeup of employees on this specific project only MINORITY GROUPS*
JOB CATEGORIES TOTAL
EMPLOYED
WHITE BLACK HISPANIC ASIAN AMERICAN
INDIAN
M F
OFFICERS&OFFICIALS
PROFESSIONAL (2)
CLERICAL & OFFICE
FIELD SUPERVISOR
SKILLED/SPECIFY
TRADE
A
B
C
D
SEMI-SKILLED (3)
UNSKILLED (4)
TOTAL ITEMS 1-7
(1) This report must be completed by prime contractor and each subcontractor. (2) Occupations requiring college education or equivalent experience: e.g., accountants, architects, scientists, teachers, etc.
(3) Workers who operate equipment or perform factory-type duties of intermediate skill level: e.g., auto attendants, laundry operators, truck drivers, etc.
(4) Works in manual occupations: e.g., laborers performing lifting, digging, mixing or loading operations, etc. An employee may be included in the minority group in which he/she appears to belong, or is regarded in the community as belonging. Eliciting information as to the racial or ethnic identity of an employee by direct inquiry is not encouraged.
51 CONTRACT DOCUMENTS
PROJECT NO. 1756
PROJECT NO. 1756: Figueroa Street Improvements from Carson Street to Lomita Boulevard
To be Submitted
AFTER
Award of Contract
52 CONTRACT
PROJECT NO. 1756
PUBLIC WORKS AGREEMENT
BETWEEN THE CITY OF CARSON AND
_____________________
THIS PUBLIC WORKS AGREEMENT (“ Agreement”) is made and entered into this ____ day of ________, 2023 by and between the City of Carson, a California charter city (“City”) and ________________, _________________ (“ Contractor”). City and Contractor may be referred to, sometimes individually or collectively, as “Party” or “Parties.”
RECITALS
A. The City desires to retain Contractor, on an independent contractor basis, to perform services for public works, as more particularly described below.
B. Contractor represents that it is fully qualified to perform such services by virtue of its experience and the training, education and expertise of its principals and employees.
C. Pursuant to the City of Carson Municipal Code and California state law, City has authority to enter into and execute this Agreement.
D. The Parties desire to formalize the selection of Contractor for performance of the services and desire that the terms of that performance be as particularly defined and described herein.
NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows:
AGREEMENT
ARTICLE 1. CONTRACTOR SERVICES
1.1 Scope of Work.
The Contractor shall perform all of the work, furnish all labor, materials, equipment, tools, utility services, and transportation, and comply with all of the specifications and requirements in the Bid Documents for the project entitled ____________________________ (“ Project”). All such work shall be performed in a good and workmanlike manner, as reasonably determined by the City, and shall be performed in compliance with all local, state, and federal laws and regulations. As used herein, “ Bid Documents” refers to all of the documents included in the solicitation of bids for the Project, including but not limited to, the Invitation for Bids, Instructions to Bidders, Bid or Bid Proposal, Contract Documents, Special Provisions, Technical Provisions, Construction Plans, Standard Plans, Drawings, Reference Specifications, all applicable permit requirements, any addenda, any applicable Project Labor Agreement, and any other documents 53 included, referenced, or incorporated therein. The Bid Documents are incorporated into this Agreement and made part hereof. In the event of any conflict between the terms of the Bid Documents and this Agreement, the terms of this Agreement shall govern.
1.2 Incorporation of Greenbook.
The provisions of the 2018 Edition of the Standard Specifications for Public Works Construction, as updated by errata, (“Greenbook”) are incorporated herein, except as explicitly modified by the Bid Documents. In the event of any conflict between the provisions of the Greenbook and this Agreement, the terms of this Agreement shall govern.
1.3 Compliance with Labor and Wage Laws.
(a) Public Work. The Parties acknowledge that the work to be performed under this Agreement is a “public work” as defined in Labor Code Section 1720 and that this Agreement is therefore subject to the requirements of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works contracts and the rules and regulations established by the Department of Industrial Relations (“ DIR”) implementing such statutes. The work performed under this Agreement is subject to compliance monitoring and enforcement by the DIR. Contractor shall post job site notices, as prescribed by regulation. (b) Registration with DIR. Pursuant to Labor Code section 1771.1, Contractor and all subcontractors must be registered with, and pay an annual fee to, the DIR prior to and during the performance of any work under this Agreement. (c) Prevailing Wages. Contractor shall pay prevailing wages to the extent required by Labor Code Section 1771. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are on file at City Hall and will be made available to any interested party on request. By initiating any work under this Agreement, Contractor acknowledges receipt of a copy of the DIR determination of the prevailing rate of per diem wages, and Contractor shall post a copy of the same at each job site where work is performed under this Agreement. If this Agreement is subject to the payment of federal prevailing wages under the Davis-Bacon Act (40 U.S.C. § 3141 et seq.), then Contractor shall pay the higher of either the state for federal prevailing wage applicable to each laborer.
(d) Penalty for Failure to Pay Prevailing Wages. Contractor shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty to the City, forfeit two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Contractor or by any subcontractor.
(e) Payroll Records. Contractor shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Contractor and each subcontractor to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform the City of the location of the records. 54 (f) Apprentices. Contractor shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6, and 1777.7 and California Code of Regulations Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects. Contractor shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Contractor shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within sixty (60) days after concluding work pursuant to this Agreement, Contractor and each of its subcontractors shall submit to the City a verified statement of the journeyman and apprentice hours performed under this Agreement.
(g) Eight-Hour Work Day. Contractor acknowledges that eight (8) hours labor constitutes a legal day’s work. Contractor shall comply with and be bound by Labor Code Section 1810.
(h) Penalties for Excess Hours. Contractor shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the performance of this Agreement by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Contractor in excess of eight (8) hours per day, and forty (40) hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than one and one-half (1½) times the basic rate of pay.
(i) Workers’ Compensation. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees if it has employees. In accordance with the provisions of California Labor Code Section 1861, Contractor certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”
(j) Contractor’s Responsibility for Subcontractors. For every subcontractor who will perform work under this Agreement, Contractor shall be responsible for such subcontractor’s compliance with Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, and shall make such compliance a requirement in any contract with any subcontractor for work under this Agreement. Contractor shall be required to take all actions necessary to enforce such contractual provisions and ensure subcontractor’s compliance, including without limitation, conducting a review of the certified payroll records of the subcontractor on a periodic basis or upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages. Contractor shall diligently take corrective action to halt or rectify any such failure by any subcontractor.
55 1.4 Compliance with Project Labor Agreement
If and to the extent that the work to be performed under this Agreement is within the scope of the City’s Project Labor Agreement, which was fully executed as of March 4, 2020, by and between the City and the Los Angeles/Orange Counties Building and Construction Trades Council and the Signatory Craft Councils and Unions (the “Project Labor Agreement”), City and Contractor acknowledge and agree that Contractor is required to comply with the provisions of the Project Labor Agreement, and that in the event of a conflict between the provisions of this Agreement and the Project Labor Agreement, the Project Labor Agreement shall supersede and take precedence over the conflicting provision(s) of this Agreement.
1.5 Licenses, Permits, Fees and Assessments.
Contractor shall obtain at its sole cost and expense such licenses, permits, registrations, and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Contractor’s performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City, its officers, employees or agents of City, against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder.
1.6 Familiarity with Work.
By executing this Agreement, Contractor warrants that Contractor (i) has thoroughly investigated and considered the scope of work to be performed, (ii) has carefully considered how the services should be performed, and (iii) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. If the services involve work upon any site, Contractor warrants that Contractor has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder.
1.7 Discovery of Unknown Conditions.
(a) Pursuant to Public Contract Code section 7104, Contractor shall promptly, and before the following conditions are disturbed, notify the City, in writing, of any: (i) material Contractor believes may be hazardous waste as defined in Section 25117 of the Health & Safety Code required to be removed to a Class I, II, or III disposal site in accordance with existing law; (ii) subsurface or latent physical conditions at the site, materially different from those indicated by information about the site made available to bidders prior to the deadline for submitting bids on the project; or (iii) unknown physical conditions at the site of any unusual nature, different from those ordinarily encountered and generally recognized as inherent in work of the character provided for in this Agreement.
(b) City shall promptly investigate the conditions, and if it finds that the conditions do materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the work, shall issue a change order in accordance with this Agreement.
56 (c) In the event that a dispute arises between City and Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in Contractor’s cost of, or time required for, performance of any part of the work, Contractor shall not be excused from any scheduled completion date set, but shall proceed with all work to be performed under the Agreement. Contractor shall retain any and all rights provided either by contract or by law, which pertain to the resolution of disputes and protests between the contracting parties.
1.8 Unidentified Utilities.
To the extent required by Government Code section 4215, City will compensate Contractor for the cost of locating, repairing damage not due to the failure of Contractor to exercise reasonable care, and removing or relocating utility facilities not identified by City in the Bid Documents with reasonable accuracy, and for equipment on the project necessarily idled during such work. Nothing herein shall be deemed to require City to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the project site can be inferred from the presence of other visible facilities, such as buildings, meters, and junction boxes, on or adjacent to the site of the construction; provided, however, nothing herein shall relieve City from identifying main or trunklines in the plans and specifications. If Contractor, while performing the work, discovers utility facilities not identified by City in the plans or specifications, Contractor shall immediately notify City and the utility in writing. This Agreement is subject to Government Code sections 4126 through 4216.9. Contractor must notify utilities and obtain an identification number before excavation or be subject to liability for damages to subsurface installations.
1.9 Trench Excavation.
Pursuant to Labor Code section 6705, if this Agreement is for more than $25,000 and requires the excavation of any trench or trenches five feet or more in depth, Contractor shall submit, in advance of such excavation, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. The plan shall be reviewed and accepted by the City, or a registered civil or structural engineer employed by the City to whom authority has been delegated, prior to the excavation. If the plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer. This section shall not be deemed to allow the use of a shoring, sloping, or protective system less effective than that required by the Construction Safety Orders. This subsection shall not be construed to impose tort liability on the City or any of its employees. Full compensation for sheeting, shoring, bracing, sloping, and all other provisions required for worker protection shall be considered as included in the contract price shown in the appropriate Bid Item, and no additional compensation will be allowed therefor.
1.10 Protection and Care of Work and Materials.
The Contractor shall adopt reasonable methods, including providing and maintaining storage facilities, during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as caused by City’s own negligence. Stored materials shall be reasonably accessible for inspection. Contractor shall not, 57 without City’s consent, assign, sell, mortgage, hypothecate, or remove equipment or materials which have been installed or delivered and which may be necessary for the completion of the work.
1.11 Warranty.
Contractor warrants all work under the Agreement (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Agreement or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the work or non-conformance of the work to the Agreement, commence and prosecute with due diligence all work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act as soon as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair, remove and replace any portions of the work (or work of other contractors) damaged by its defective work or which becomes damaged in the course of repairing or replacing defective work. For any work so corrected, Contractor’s obligation hereunder to correct defective work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected work.
Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Agreement. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Agreement, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non-conforming work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole expense.
Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand.
1.12 Additional Work and Change Orders.
(d) City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Work or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written change order is first given by the Project Manager to the Contractor, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Contractor (“Change Order”). All Change Orders must be signed by the Contractor and Project Manager prior to commencing the extra work thereunder.
58 (e) Any increase in compensation of up to ten percent (10%) of the Contract Sum or any increase in the time to perform of up to one hundred eighty (180) days and which are not detrimental to the Work or to the interest of the City, may be approved by the Project Manager. Any greater increases, taken either separately or cumulatively, must be approved by the City Council.
(f) Any adjustment in the Contract Sum for a Change Order must be in accordance with the rates set forth in the Contractor’s Bid. If the rates in the Contractor’s Bid do not cover the type of work in the Change Order, the cost of such work shall not exceed an amount agreed upon in writing and signed by Contractor and Project Manager. If the cost of the Change Order cannot be agreed upon, the City will pay for actual work of the Change Order completed, to the satisfaction of the City, as follows:
(i) Labor: The cost of labor shall be the actual cost for wages of workers and subcontractors performing the work for the Change Order at the time such work is done. The use of labor classifications that would increase the cost of such work shall not be permitted.
(ii) Materials and Equipment: The cost of materials and equipment shall be at cost to Contractor or lowest current price which such materials and equipment are reasonably available at the time the work is done, whichever is lower. (iii) If the cost of the extra work cannot be agreed upon, the Contractor must provide a daily report that includes invoices for labor, materials and equipment costs for the work under the Change Order. The daily report must include: list of names of workers, classifications, and hours worked; description and list of quantities of materials used; type of equipment, size, identification number, and hours of operation, including loading and transportation, if applicable; description of other City authorized services and expenditures in such detail as the City may require. Failure to submit a daily report by the close of the next working day may, at the City’s sole and absolute discretion, waive the Contractor’s rights for that day. (g) It is expressly understood by Contractor that the provisions of this Section shall not apply to services specifically set forth in the Scope of Work. Contractor hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Work may be more costly or time consuming than Contractor anticipates and that Contractor shall not be entitled to additional compensation therefor. City may in its sole and absolute discretion have similar work done by other contractors.
(h) No claim for an increase in the Contract Sum or time for performance shall be valid unless the procedures established in this Section are followed.
1.13 Special Requirements.
Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the “Special Requirements,” attached hereto as Exhibit B and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit B and any other provisions of this Agreement, the provisions of Exhibit B shall govern. 59 ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT.
2.1 Contract Sum.
Subject to any limitations set forth in this Agreement, City agrees to pay Contractor the amounts set forth in Contractor’s Bid, attached hereto as Exhibit A and incorporated herein by this reference. Subject to any additions or deductions that may be made by change order or amendment, and any penalties or damages that may be assessed against Contractor, Contractor shall receive total compensation of _____________________ Dollars ($__________) (“Contract Sum”) for completion of the work.
2.2 Invoices.
Each month Contractor shall furnish to City an original invoice for all work performed during the preceding month in a form approved by City’s Director of Finance. By submitting an invoice for payment under this Agreement, Contractor is certifying compliance with all provisions of the Agreement.
All invoices shall include a copy of Contractor’s Certified Payroll and proof that Certified Payroll has been submitted to the DIR. Contractor shall also submit a list of the prevailing wage rates (including federal prevailing wage rates, if applicable) for all employees and subcontractors providing services under this Agreement, as applicable, with Contractor’s first invoice. If these rates change at any time during the term of the Agreement, Contractor shall submit a new list of rates to the City with its first invoice following the effective date of the rate change.
2.3 Payment.
City shall independently review each invoice submitted by the Contractor to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. Except as to any charges for work performed or expenses incurred by Contractor which are disputed by City, City will cause Contractor to be paid within thirty (30) days of receipt of Contractor’s correct and undisputed invoice; however, Contractor acknowledges and agrees that due to City warrant run procedures, the City cannot guarantee that payment will occur within this time period. In the event that City does not cause Contractor to be paid within thirty (30) days of receipt of an undisputed and properly submitted invoice, Contractor shall be entitled to the payment of interest to the extent allowed under Public Contract Code section 20104.50. In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Contractor, not later than seven (7) days after receipt by the City, for correction and resubmission. Returned invoices shall be accompanied by a document setting forth in writing the reasons why the payment request was rejected. Review and payment by the City of any invoice provided by the Contractor shall not constitute a waiver of any rights or remedies provided herein or any applicable law.
2.4 Retention.
Pursuant to Section 9203 of the Public Contract Code, City will deduct a five percent (5%) retention from all progress payments, which shall be released to Contractor no later than sixty (60) days from completion of the work in accordance with Section 7107 of the Public Contract Code. 60 In the event of a dispute between City and Contractor, City may withhold from the final payment an amount not to exceed one hundred fifty percent (150%) of the disputed amount.
2.5 Waiver.
Payment to Contractor for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Contractor.
2.6 Substitution of Securities.
(a) In conformance with the State of California Public Contract Code, Part 5, Section 22300, Contractor may substitute securities for any monies withheld by the City to ensure performance under this Agreement.
(b) At the request and expense of Contractor, Contractor has the option of establishing an escrow account with a state or federally chartered bank which shall serve as an escrow agent, for Contractor’s direct deposit of securities as a substitute for retention earnings required to be withheld by the City. Upon Contractor’s completion of its obligations hereunder, as evidenced by the City’s acceptance of the work pursuant to Section 3.3 hereof, the escrow agent shall return the securities to Contractor. The escrow agent shall notify the City within ten (10) days after deposit of the securities. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention. Securities shall be held in the name of the City and shall designate Contractor as the beneficial owner. Alternatively, on written request of Contractor, the City shall make payments of the retention earnings directly to the escrow account.
ARTICLE 3. PERFORMANCE SCHEDULE
3.1 Schedule of Performance.
Contractor shall complete the Project within Ninety (90) working days after receiving a “Notice to Proceed” from the City in accordance with any schedule contained in or required to be provided by the Bid Documents, and any revisions thereof approved by the City in writing. Time is of the essence. If the work is not completed within said time period, liquidated damages shall apply. The term of this Agreement shall expire one (1) year following City’s acceptance of the Project.
3.2 Liquidated Damages.
Since the determination of actual damages for any delay in performance of this Agreement would be extremely difficult or impractical to determine in the event of a breach of this Agreement, the Contractor and its sureties shall be liable for and shall pay to the City the sum of One Thousand Dollars ($1,000.00) as liquidated damages for each working day of delay in the performance of any service required hereunder. The City may withhold any accrued liquidated damages from any monies payable on account of services performed by the Contractor. To the extent required by Government Code section 4215, Contractor shall not be assessed liquidated damages for delay in completion of the work when such delay was caused by the failure of the City or owner of the utility to provide for removal or relocation of utility facilities. 61 3.3 Force Majeure.
The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Contractor shall within ten (10) days of the commencement of such delay notify the Project Manager in writing of the causes of the delay. The Project Manager shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Project Manager such delay is justified. The Project Manager’s determination shall be final and conclusive upon the Parties to this Agreement. In no event shall Contractor be entitled to recover damages against the City for any delay in the performance of this Agreement, however caused, Contractor’s sole remedy being extension of the Agreement pursuant to this Section.
3.4 Final Acceptance.
Acceptance of the Project shall only be by action of the City Council. Neither the acceptance nor any prior inspections or failure to inspect shall constitute a waiver by City of any defects in the work. From and after acceptance, the Project shall be owned and operated by City.
As a condition to acceptance, Contractor shall certify to City in writing that all of the work has been performed in strict conformity with the Agreement and that all costs have been paid or supplied to City for security required herein, satisfactory to City, guaranteeing such performance.
ARTICLE 4. COORDINATION OF WORK
4.1 Representatives and Personnel of Contractor.
The following principals of Contractor (“Principals”) are hereby designated as being the principals and representatives of Contractor authorized to act on its behalf with respect to the work specified herein and make all decisions in connection therewith:
________________________ ________________________
(Name) (Title)
________________________ ________________________
(Name) (Title)
________________________ ________________________
(Name) (Title)
The Principals shall be responsible during the term of this Agreement for directing all activities of Contractor and devoting sufficient time to personally supervise the services hereunder. All personnel of Contractor, and any authorized agents, shall at all times be under the exclusive direction and control of the Principals. For purposes of this Agreement, the Principals may not be replaced nor may their responsibilities be substantially reduced by Contractor without the express written approval of City. Additionally, Contractor shall make every reasonable effort to maintain 62 the stability and continuity of Contractor’s staff and subcontractors, if any, assigned to perform the services required under this Agreement. Contractor shall notify City of any changes in Contractor’s staff and subcontractors, if any, assigned to perform the services required under this Agreement, prior to and during any such performance.
4.2 Status of Contractor.
Contractor shall have no authority to bind City in any manner, or to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Contractor shall not at any time or in any manner represent that Contractor or any of Contractor’s officers, employees, or agents are in any manner officials, officers, employees or agents of City. Neither Contractor, nor any of Contractor’s officers, employees or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Contractor expressly waives any claim Contractor may have to any such rights.
4.3 Project Manager.
The Project Manager shall be Jesus Sanchez or any other person as may be designated by the City Manager. It shall be the Contractor’s responsibility to assure that the Project Manager is kept informed of the progress of the performance of the services and the Contractor shall refer any decisions which must be made by City to the Project Manager. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Project Manager. The Project Manager shall have authority, if specified in writing by the City Manager, to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.
4.4 Independent Contractor.
Neither the City nor any of its employees shall have any control over the manner, mode or means by which Contractor, its agents or employees, perform the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Contractor’s employees, servants, representatives or agents, or in fixing their number, compensation or hours of service. Contractor shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. City shall not in any way or for any purpose become or be deemed to be a partner of Contractor in its business or otherwise or a joint venturer or a member of any joint enterprise with Contractor.
4.5 Prohibition Against Subcontracting or Assignment.
The experience, knowledge, capability and reputation of Contractor, its principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, Contractor shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City. All subcontractors shall obtain, at its or Contractor’s expense, such licenses, permits, registrations and approvals (including from the City) as may be required by law for the performance of any services or work under this Agreement. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted 63 hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City.
ARTICLE 5. INSURANCE, INDEMNIFICATION AND BONDS
5.1 Insurance Coverages.
Without limiting Contractor’s indemnification of City, and prior to commencement of any services under this Agreement, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City.
(a) General liability insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $5,000,000 per occurrence, $10,000,000 general aggregate, for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
(b) Automobile liability insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Services to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $2,000,000 combined single limit for each accident. (c) Workers’ compensation insurance. Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000).
(d) Builder’s Risk Insurance. Contractor shall maintain Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions or provisional limit provisions. The policy must include: (1) coverage for any ensuing loss from faulty workmanship, nonconforming work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the project; (4) ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) ocean marine cargo coverage insuring any project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the project site or any staging area.
If the Project does not involve new or major reconstruction, then at the option of City, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that 64 provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the work, including during transit, installation, and testing at the Project site.
(e) Pollution Liability Insurance. Contractor shall maintain Environmental Impairment Liability insurance, written on a Contractor’s Pollution Liability form or other form acceptable to City providing coverage for liability arising out of sudden, accidental, and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.
Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer.
If Contractor maintains broader coverage and/or higher limits than the minimums shown above, City requires and shall be entitled to the broader coverage and/or the higher limits maintained by Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.
5.2 General Insurance Requirements.
(f) Subcontractors. Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall include all of the requirements stated herein. (g) Proof of Insurance. Contractor shall provide certificates of insurance and endorsements to City as evidence of the insurance coverages required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by City’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. City reserves the right to require complete, certified copies of all required insurance policies, at any time.
(h) Duration of Coverage. Contractor shall procure and maintain for the duration of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Services hereunder by Contractor, its agents, representatives, employees or subcontractors. (i) Primary/noncontributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of 65 primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non- contributory basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
(j) City’s Rights of Enforcement. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Contractor or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Agreement. (k) Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors.
(l) Enforcement of Contract Provisions (non-estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder.
(m) Requirements Not Limiting. Requirements of specific coverage features or limits contained in this section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
(n) Notice of Cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide to City with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
(o) Additional Insured Status. General and auto liability policies shall provide or be endorsed to provide that City and its officers, officials, employees, and agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.
(p) Prohibition of Undisclosed Coverage Limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 66 (q) Separation of Insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions. (r) Pass Through Clause. Contractor agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to City for review. (s) Agency’s Right to Revise Specifications. The City reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City and Contractor may renegotiate Contractor’s compensation.
(t) Self-Insured Retentions. Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by City.
(u) Timely Notice of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
(v) Additional Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work.
5.3 Indemnification.
Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers (each, an “Indemnitee”) from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with Contractor's performance of work under this Agreement or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both City and Contractor, or should City otherwise find Contractor’s legal counsel unacceptable, then Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsels fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless or 67 wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
Contractor obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of City under any provision of this Agreement, Contractor shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City’s active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City.
5.4 Notification of Third-Party Claims.
City shall timely notify Contractor of the receipt of any third-party claim relating to the work under this Agreement. City shall be entitled to recover from Contractor its reasonable costs incurred in providing such notification.
5.5 Performance and Payment Bonds.
Concurrently with execution of this Agreement, Contractor shall deliver to the City all of the following bonds:
(w) A performance bond securing the faithful performance of this Agreement, in an amount not less than 100% of the total compensation for this Agreement, as stated in Section
2.1. (x) A payment bond, securing the payment of all persons furnishing labor and/or materials in connection with the work under this Agreement, in an amount not less than 100% of the total compensation for this Agreement, as stated in Section 2.1.
All bonds shall be on the applicable forms provided in Exhibit “C” and Exhibit “D” attached hereto and made part hereof. The bonds shall each contain the original notarized signature of an authorized officer of the surety and affixed thereto shall be a certified and current copy of his/her power of attorney. The bonds shall be unconditional and remain in force during the entire term of the Agreement until released pursuant to Section 5.7 hereof.
5.6 Sufficiency of Insurer or Surety.
Insurance and bonds required by this Agreement shall be satisfactory only if issued by companies qualified to do business in California, rated “A” or better in the most recent edition of Best’s Rating Guide, The Key Rating Guide or in the Federal Register, and only if they are of a financial category Class VII or better. If the City determines that the work to be performed under this Agreement creates an increased or decreased risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies and the bonds required in Section 5.5 may be changed accordingly upon receipt of written notice from the City. 68 5.7 Release of Securities.
City shall release the performance bond and payment bond when the following have occurred:
(a) Contractor has made a written request for release and provided evidence of satisfaction of all other requirements under Article 5 of this Agreement; (b) the Project has been accepted; and
(c) after passage of the time within which lien claims are required to be made pursuant to applicable laws; if lien claims have been timely filed, City shall hold the payment bond until such claims have been resolved, Contractor has provided statutory bond, or otherwise as required by applicable law.
ARTICLE 6. RECORDS, REPORTS, AND RELEASE OF INFORMATION
6.1 Records.
Contractor shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies, certified and accurate copies of payroll records in compliance with all applicable laws, or other documents relating to the disbursements charged to City and services performed hereunder (the “books and records”), as shall be necessary to perform the services required by this Agreement and enable the Project Manager to evaluate the performance of such services. Any and all such documents shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Project Manager shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of 3 years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required.
In the event of dissolution of Contractor’s business, custody of the books and records may be given to City, and access shall be provided by Contractor’s successor in interest. Notwithstanding the above, the Contractor shall fully cooperate with the City in providing access to the books and records if a public records request is made and disclosure is required by law including but not limited to the California Public Records Act.
6.2 Reports.
Contractor shall periodically prepare and submit to the Project Manager such reports concerning the performance of the services required by this Agreement as the Project Manager shall require. Contractor hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Contractor agrees that if Contractor becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein, Contractor shall promptly notify the Project Manager of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto. 69 6.3 Ownership of Documents.
All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (the “documents and materials”) prepared by Contractor, its employees, subcontractors and agents in the performance of this Agreement shall be the property of City and shall be delivered to City upon request of the Project Manager or upon the termination of this Agreement, and Contractor shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the documents and materials hereunder. Any use, reuse or assignment of such completed documents for other projects and/or use of uncompleted documents without specific written authorization by the Contractor will be at the City’s sole risk and without liability to Contractor, and Contractor’s guarantee and warranties shall not extend to such use, reuse or assignment. Contractor may retain copies of such documents for its own use. Contractor shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Contractor fails to secure such assignment, Contractor shall indemnify City for all damages resulting therefrom. Moreover, Contractor with respect to any documents and materials that may qualify as “works made for hire” as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed “works made for hire” for the City.
6.4 Confidentiality and Release of Information.
(y) Information gained or work product produced by Contractor in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Contractor. Contractor shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the Project Manager.
(z) Contractor, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the Project Manager or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered “voluntary” provided Contractor gives City notice of such court order or subpoena. (aa) If Contractor, or any officer, employee, agent or subcontractor of Contractor, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Contractor for any damages, costs and fees, including attorneys’ fees, caused by or incurred as a result of Contractor’s conduct. (bb) Contractor shall promptly notify City should Contractor, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed there under. City retains the right, but has no obligation, to represent Contractor or be present at any deposition, hearing or similar proceeding. Contractor agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by 70 Contractor. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response.
ARTICLE 7. ENFORCEMENT OF AGREEMENT; DEFAULT, SUSPENSION AND
TERMINATION
7.1 California Law.
This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other appropriate court in such county, and Contractor covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Eastern District of California, in the County of Los Angeles, State of California.
7.2 Default of Contractor.
Contractor’s failure to comply with the provisions of this Agreement shall constitute a default. In the event that Contractor is in default for cause under the terms of this Agreement, City shall have no obligation or duty to continue compensating Contractor for any work performed after the date of default and can terminate or suspend this Agreement immediately by written notice to Contractor. If the Project Manager determines that Contractor is in default in the performance of any of the terms or conditions of this Agreement, the Project Manager shall cause to be served upon Contractor a written notice of the default. Contractor shall have ten (10) days after service upon it of said notice in which to cure the default by rendering a satisfactory performance. In the event that Contractor fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled at law, in equity or under this Agreement.
7.3 Suspension and Termination.
(a) The City may at any time, for any reason, with or without cause, suspend this Agreement, or any portion hereof, by serving upon Contractor at least ten (10) days prior written notice. Upon receipt of said notice, Contractor shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends a portion of this Agreement such suspension shall not make void or invalidate the remainder of this Agreement. (b) This Agreement may be terminated by either party for cause. The City may terminate this Agreement without cause upon thirty (30) days’ written notice of termination.
Upon termination, Contractor shall be entitled to compensation for completion of any portion of the Project accepted by City up to the effective date of termination unless any portion of the Project is accepted by City after termination in which event Contractor shall be paid for such completed portion.
71 7.4 Dispute Resolution Process.
Section 20104 et seq. of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial-supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims.
The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Section shall be construed to be consistent with said statutes.
For purposes of these procedures, “claim” means a separate demand by the Contractor, after the City has denied Contractor’s timely and duly made request for payment for extra work and/or a time extension, for (A) a time extension, (B) payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the Agreement and payment of which is not otherwise expressly provided for or the Contractor is not otherwise entitled to, or (C) an amount the payment of which is disputed by the City.
The following requirements apply to all claims to which this section applies:
(cc) Claim Submittal. The claim shall be in writing and include the documents necessary to substantiate the claim. Claims governed by this procedure must be filed on or before the date of final payment. Nothing in this section is intended to extend the time limit or supersede notice requirements otherwise provided in the Agreement for the filing of claims, including all requirements pertaining to compensation or payment for extra work, disputed work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon. (dd) Supporting Documentation. The Contractor shall submit all claims in the following format:
(i) Summary of the claim, including references to the specific Contract Document provisions upon which the claim is based.
(ii) List of documents relating to claim: (a) Specifications, (b) Drawings, (c) Clarifications (Requests for Information), (d) Schedules, and (e) Other. (iii) Chronology of events and correspondence related to the claim. (iv) Statement of grounds for the claim.
(v) Analysis of the claim’s cost, if any.
(vi) Analysis of the claim’s time/schedule impact, if any. (ee) City’s Response. Upon receipt of a claim pursuant to this section, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the City issues its written statement. 72 (i) If the City needs approval from the City Council to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three days following the next duly publicly noticed meeting of the City Council after the 45-day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion. (ii) Within 30 days of receipt of a claim, the City may request in writing additional documentation supporting the claim or relating to defenses or claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor. (iii) The City’s written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $50,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.
(ff) Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 days of receipt of the City’s response or within 15 days of the City’s failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute. (gg) Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time. (i) If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. (ii) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. 73 (iii) Unless otherwise agreed to by the City and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Public Contract Code Section 20104.4 to mediate after litigation has been commenced. (iv) All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed. (hh) City’s Responses. The City’s failure to respond to a claim from the Contractor within the time periods described in this section or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the City’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility of qualifications of the Contractor. City’s failure to respond shall not waive City’s rights to any subsequent procedures for the resolution of disputed claims.
(ii) Government Code Claims. If following the mediation, the claim or any portion remains in dispute, the Contractor must comply with the claim procedures set forth in Government Code Section 900 et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, construction claims, and/or changed conditions, including any required mediation, have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the City may be filed. A Government Code claim must be filed no earlier than the date that Contractor completes all contractual prerequisites to filing a Government Code claim, including any required mediation.
A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted. For purposes of Government Code Section 900 et seq., the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim to the City until the time the claim is denied, including any period of time utilized by the meet and confer conference or mediation that does not result in a complete resolutions of all claims. (jj) Civil Actions for Claims of $375,000 or Less. The following procedures are established for all civil actions filed to resolve claims totaling $375,000 or less:
(i) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the procedures in this Section.
The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court or by stipulation of both parties.
If the parties fail to select a mediator within the 15-day period, either party may petition the court to appoint the mediator.
74 (ii) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code. The Civil Discovery Act (Title 4 (commencing with Section 2016.010) of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.
(iii) Upon stipulation of the parties, arbitrators appointed for these purposes shall be experienced in construction law, and, upon stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly rates of pay not to exceed their customary rate, and such fees and expenses shall be paid equally by the parties, except in the case of arbitration where the arbitrator, for good cause, determines a different division. (iv) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, pay the attorney's fees of the other party arising out of the trial de novo.
7.5 Waiver.
Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision or a waiver of any subsequent breach or violation of any provision of this Agreement.
Acceptance by City of any work or services by Contractor shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver.
Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement.
7.6 Rights and Remedies Are Cumulative.
Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party.
7.7 Unfair Business Practices Claims.
Pursuant to Public Contract Code section 7103.5, in entering into this Agreement, Contractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials related to this Agreement. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor without further acknowledgment by the Parties. 75 ARTICLE 8. CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION
8.1 Non-liability of City Officers and Employees.
No officer or employee of the City shall be personally liable to the Contractor, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms of this Agreement.
8.2 Conflict of Interest.
Contractor covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Contractor’s performance of services under this Agreement. Contractor further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the Project Manager. Contractor agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement.
No officer or employee of the City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which affects his financial interest or the financial interest of any corporation, partnership or association in which he is, directly or indirectly, interested, in violation of any State statute or regulation. The Contractor warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement.
8.3 Covenant Against Discrimination.
Contractor covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry, or other protected class in the performance of this Agreement. Contractor shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry, or other protected class.
8.4 Unauthorized Aliens.
Contractor hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C. § 1101 et seq. , as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Contractor so employ such unauthorized aliens for the performance of work and/or services covered by this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Contractor hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys’ fees, incurred by City. 76 ARTICLE 9. MISCELLANEOUS PROVISIONS
9.1 Provisions Required By Law.
Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein, and the Agreement shall be read and enforced as though it were included herein. If through mistake or otherwise any such provision is not inserted, or is not correctly inserted, then upon application of either party, the contract shall forthwith be physically amended to make such insertion or correction.
9.2 Notices.
Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the attention of the Project Manager (with her/his name and City title), City of Carson, 701 E Carson Street, Carson, California 90745 and in the case of the Contractor, to the person(s) at the address designated on the execution page of this Agreement. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated at the time personally delivered or in seventy-two (72) hours from the time of mailing if mailed as provided in this Section.
9.3 Interpretation.
The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply.
9.4 Counterparts.
This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument.
9.5 Integration; Amendment.
This Agreement including the attachments hereto is the entire, complete and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by the Contractor and by the City Council. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void.
9.6 Severability.
In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any 77 of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless.
9.7 Warranty & Representation of Non-Collusion.
No official, officer, or employee of City has any financial interest, direct or indirect, in this Agreement, nor shall any official, officer, or employee of City participate in any decision relating to this Agreement which may affect his/her financial interest or the financial interest of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any State or municipal statute or regulation. The determination of “financial interest” shall be consistent with State law and shall not include interests found to be “remote” or “noninterests” pursuant to Government Code Sections 1091 or 1091.5. Contractor warrants and represents that it has not paid or given, and will not pay or give, to any third party including, but not limited to, any City official, officer, or employee, any money, consideration, or other thing of value as a result or consequence of obtaining or being awarded any agreement.
Contractor further warrants and represents that (s)he/it has not engaged in any act(s), omission(s), or other conduct or collusion that would result in the payment of any money, consideration, or other thing of value to any third party including, but not limited to, any City official, officer, or employee, as a result of consequence of obtaining or being awarded any agreement. Contractor is aware of and understands that any such act(s), omission(s) or other conduct resulting in such payment of money, consideration, or other thing of value will render this Agreement void and of no force or effect.
9.8 Corporate Authority.
The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE]
78 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first-above written.
CITY:
CITY OF CARSON, a California charter
city
______________________________
_________________, Mayor
ATTEST:
________, City Clerk
APPROVED AS TO FORM:
ALESHIRE & WYNDER, LLP
_____________________________
Sunny K. Soltani, City Attorney
CONTRACTOR:
___________________________________
*By: _______________________________
Name: _____________________________
Title: _____________________________
*By: _______________________________
Name: _____________________________
Title: _____________________________
Address:
____________________________________
____________________________________
____________________________________
*Two corporate officer signatures required when Contractor is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. CONTRACTOR’S
SIGNATURES SHALL BE DULY NOTARIZED, AND APPROPRIATE ATTESTATIONS SHALL BE
INCLUDED AS MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONTRACTOR’S BUSINESS ENTITY. 79 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES
On __________, 2023 before me, ________________, personally appeared ________________, proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature: _____________________________________
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
INDIVIDUAL
CORPORATE OFFICER
_______________________________
TITLE(S)
PARTNER(S) LIMITED
GENERAL
ATTORNEY-IN-FACT
TRUSTEE(S)
GUARDIAN/CONSERVATOR
OTHER_______________________________
______________________________________
SIGNER IS REPRESENTING:
(NAME OF PERSON(S) OR ENTITY(IES))
_____________________________________________
_____________________________________________
___________________________________
TITLE OR TYPE OF DOCUMENT
___________________________________
NUMBER OF PAGES
___________________________________
DATE OF DOCUMENT
___________________________________
SIGNER(S) OTHER THAN NAMED ABOVE
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. 80 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES
On __________, 2023 before me, ________________, personally appeared ________________, proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature: _____________________________________
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
INDIVIDUAL
CORPORATE OFFICER
_______________________________
TITLE(S)
PARTNER(S) LIMITED
GENERAL
ATTORNEY-IN-FACT
TRUSTEE(S)
GUARDIAN/CONSERVATOR
OTHER_______________________________
______________________________________
SIGNER IS REPRESENTING:
(NAME OF PERSON(S) OR ENTITY(IES))
_____________________________________________
_____________________________________________
___________________________________
TITLE OR TYPE OF DOCUMENT
___________________________________
NUMBER OF PAGES
___________________________________
DATE OF DOCUMENT
___________________________________
SIGNER(S) OTHER THAN NAMED ABOVE
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document. 81 EXHIBIT A
CONTRACTOR’S BID
82 EXHIBIT B
SPECIAL REQUIREMENTS
(Superseding Contract Boilerplate)
If the Parties wish to revise provisions in the Agreement above (from page 1 through the signature page), then the revisions shall be presented in this Exhibit B, with deletions shown in strike through and additions shown in bold and italics.
83 EXHIBIT C
PERFORMANCE BOND
PROJECT NO. 1756
We, _________, as Principal, and ____________, as Surety, jointly and severally, firmly bind ourselves, our heirs, representatives, successors and assigns, as set forth herein, to the City of Carson (“City”) for payment of the penal sum of __________ U.S. Dollars and __ Cents ($_______). City and Principal have entered into an agreement, or are about to enter into the agreement attached hereto and incorporated by reference herein, for completion of public works for the property(ies) referenced in said agreement. Surety herein approves of the terms and conditions of said agreement and binds itself to faithfully perform the obligations of Principal therein if Principal fails to so perform. Surety acknowledges that the agreement herein referenced shall be that document as executed by City and Principal.
THE CONDITION OF THIS OBLIGATION IS SUCH that if the Principal shall in all things stand to and abide by, and well and truly keep and perform all of the covenants, conditions, and provisions in said agreement, and any alteration thereof made as therein provided, on Principal's part to be kept and performed at the time and in the manner therein specified, and shall indemnify and save harmless the City, City’s engineer, and their consultants, and each of their officials, directors, officers, employees and agents, as therein stipulated, then this obligation shall become null and void; otherwise, it shall be and remain in full force and effect.
Surety agrees that should it fail to take over and diligently perform the agreement upon Principal's default after notice and within the time specified in the agreement, Surety will promptly on demand deposit with City such amount as City may reasonably estimate as the cost of completing all of Principal's obligations. Surety's obligation for payment herein shall exist, notwithstanding any controversy between Principal and City regarding Principal's failure under the agreement, and payment by Surety should be conclusively presumed between the parties herein to relieve, as demanded, Surety's obligations herein and shall be deemed proper payment as between Principal and Surety.
Surety agrees that no change, extension of time, alteration, or addition to the terms of the agreement, or the work to be performed thereunder or the plans and specifications, or any matters unknown to Surety which may affect Surety's risk shall in any wise affect its obligation on this bond, and it does thereby waive notice thereof.
Principal and Surety agree that if the City is required to engage the services of an attorney in connection with the enforcement of this bond, each shall pay City's reasonable attorneys' fees incurred, with or without suit, in addition to the above sum. 84 Executed this day of _________, ____.
Seal of Corporation _____________
By:____________________________________
Authorized Representative of Principal
Title: _____________
(ATTACH ACKNOWLEDGEMENT OF AUTHORIZED REPRESENTATIVES)
Any claims under this bond may be addressed to: (check one) Surety's agent for service
of process in California: ( ) _____________________
[name of surety company]
_________________________ ____________________________________ Name Street Number
_________________________ ____________________________________ Street Number City and State
_________________________ ____________________________________ City and State Telephone Number
_________________________
Telephone Number
By:____________________________________
Attorney in Fact or other
Representative
(ATTACH ACKNOWLEDGEMENT OF AUTHORIZED REPRESENTATIVE)
Furnish the name, address and phone number of the company agent as well as the surety company.
Sureties must be authorized to do business in and have an agent for service of process in California and be on the accredited list of the United States Treasury Department (their bonds will be limited to such amounts as would be acceptable to the Treasury Department), and otherwise meet the requirements of the agreement.
ALL SIGNATURES MUST BE WITNESSED BY NOTARY
(attach appropriate jurats)
85 EXHIBIT D
PAYMENT BOND
PROJECT NO. 1756
We, ______, as Principal, and ____________, as Surety, jointly and severally, firmly bind ourselves, our heirs, representatives, successors and assigns, as set forth herein, to the City of Carson (“City”) and those for whose benefit this bond insures in the sum of ______________ U.S.
Dollars and __ Cents ($________). City and Principal have entered into an agreement, or are about to enter into the agreement attached hereto and incorporated by reference herein, for completion of public works for the property(ies) referenced in said agreement. Surety herein approves of the terms and conditions of said agreement and binds itself to faithfully perform the obligations of Principal therein if Principal fails to so perform. Surety acknowledges that the agreement herein referenced shall be that document as executed by City and Principal. If Principal or any of Principal's contractors or subcontractors, fails to pay any of the persons named in Section 9000 et seq . of the California Civil Code employed in the performance of the agreement for materials furnished or for labor thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, then Surety shall pay the same in an amount not exceeding the sum specified above, and also shall pay, in case suit is brought upon this bond, such reasonable attorneys' fees as shall be fixed by the court.
Surety agrees that it shall pay the amounts due the persons above named and diligently perform the agreement upon Principal's default after notice and within the time specified in the agreement.
If Surety fails to perform within the times specified in the agreement, Surety shall promptly on demand deposit with City such amount as City may reasonably estimate as the cost of completing all of Principal's obligations. Surety's obligation for payment herein shall extend, notwithstanding any controversy between Principal and City regarding Principal's failure under the agreement.
Principal and Surety agree that any payment by Surety pursuant to this paragraph should be conclusively presumed between the parties herein to relieve, as demanded, Surety's obligation herein and shall be deemed proper payment as between Principal and Surety.
This bond shall insure to the benefit of any and all of the persons named in Section 9000 et seq. of the California Civil Code so as to give a right of action to them or their assigns in any suit brought upon this bond.
Surety agrees that no change, extension of time, alteration, or addition to the terms of the agreement, or the work to be performed thereunder, or the plans and specifications, or any matters unknown to Surety which might affect Surety's risk, shall in any way affect its obligation on this bond, and it does hereby waive notice thereof.
Principal and Surety agree that should City become a party to any action on this bond, that each will also pay City's reasonable attorneys' fees incurred therein in addition to the above sums.
Executed this _____________ day of ___________, ______. 86 Seal of Corporation ______________
By:______________________________
Authorized Representative of Principal
Title: __________
(ATTACH ACKNOWLEDGEMENT OF AUTHORIZED REPRESENTATIVES)
Any claims under this bond may be addressed to: (check one) Surety's agent for service
of process in California: ( ) ________________
[name of surety]
_________________________ _____________________________ Name Street Number
_________________________ _____________________________ Street Number City and State
_________________________ _____________________________ City and State Telephone Number
_________________________
Telephone Number
By:_____________________________
Attorney in Fact or other
Representative
(ATTACH ACKNOWLEDGEMENT OF AUTHORIZED REPRESENTATIVE)
Furnish the name, address and phone number of the company agent as well as the surety company.
Sureties must be authorized to do business in and have an agent for service of process in California and be on the accredited list of the United States Treasury Department (their bonds will be limited to such amounts as would be acceptable to the Treasury Department), and otherwise meet the requirements of the agreement.
ALL SIGNATURES MUST BE WITNESSED BY NOTARY
(attach appropriate jurats)
87 CONTRACT
PROJECT NO. 1756
EXHIBIT A-1
WORKER'S COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by the California Labor Code, Sections 1860 and 1861:
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of the Contract.
DATED:
CONTRACTOR
By
Signature
Title
ATTEST:
By
Signature
Title
88 INDEMNIFICATION AND HOLD HARMLESS AGREEMENT
AND WAIVER OF SUBROGATION AND CONTRIBUTION
Contract/Agreement/License/Permit No. or description: ________________________________________ ______________________________________________________________________________________ Indemnitor(s) (list all names):
To the fullest extent permitted by law, Indemnitor hereby agrees, at its sole cost and expense, to defend, protect, indemnify, and hold harmless the City of Carson and Successor Agency and their respective elected officials, officers, attorneys, agents, employees, volunteers, successors, and assigns (collectively “Indemnitees”) from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, expenses, judgments, penalties, liens, and losses of any nature whatsoever, including fees of accountants, attorneys, or other professionals and all costs associated therewith (collectively “Liabilities”), arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to any act, failure to act, error, or omission of Indemnitor or any of its officers, agents, servants, employees, subcontractors, materialmen, suppliers or their officers, agents, servants or employees, arising or claimed to arise, directly or indirectly, out of, in connection with, resulting from, or related to the above-referenced contract, agreement, license, or permit (the “Agreement”) or the performance or failure to perform any term, provision, covenant, or condition of the Agreement, including this indemnity provision. This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive negligence by Indemnitees and shall operate to fully indemnify Indemnitees against any such negligence. This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against an Indemnitee shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision. Indemnitor shall pay Indemnitees for any attorneys’ fees and costs incurred in enforcing this indemnification provision. Notwithstanding the foregoing, nothing in this instrument shall be construed to encompass (a) Indemnitees’ sole negligence or willful misconduct to the limited extent that the underlying Agreement is subject to Civil Code 2782(a), or (b) the contracting public agency’s active negligence to the limited extent that the underlying Agreement is subject to Civil Code 2782(b). This indemnity is effective without reference to the existence or applicability of any insurance coverages which may have been required under the Agreement or any additional insured endorsements which may extend to Indemnitees.
Indemnitor, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Indemnitor regardless of any prior, concurrent, or subsequent active or passive negligence by the Indemnitees. Accountants, attorneys, or other professionals employed by Indemnitor to defend Indemnitees shall be selected by or subject to the approval of Indemnitees.
In the event there is more than one person or entity named in the Agreement as an Indemnitor, then all obligations, liabilities, covenants and conditions under this instrument shall be joint and several. “Indemnitor”
Name_______________________________________ Name_____________________________________ By:_________________________________________ By:_______________________________________
TO BE SIGNED BY THE CONTRACTOR
89 EXHIBIT A
INSTRUCTIONS FOR COMPLETING, EXECUTING AND SUBMITTING
EVIDENCE OF INSURANCE TO THE OWNER
Insured: Date:
(Contractor, Lessee, Permittee, etc.)
Insured
A. 1. In order to reduce problems and time delays in providing evidence of insurance to the Owner, you are requested to give your insurance agent or broker a copy of the attached Insurance Requirements and endorsement forms along with these instructions for completing, executing, and submitting evidence of insurance.
2. If the agreement requires Workers' Compensation coverage and you have been authorized by the State of California to self-insure Workers' Compensation, then a copy of the certificate from the State authorizing self-insurance for Workers' Compensation shall meet the requirements for Workers' Compensation insurance covering activities within the State of California.
3. All questions relating to insurance should be directed to the department or office responsible for your contract, lease, permit, or other agreement.
Insurance Agent or Broker
B. 1. The appropriate Endorsement Form shall be used. No changes in the terms of the Endorsement will be permitted. Certificates of Insurance alone will not be accepted by the Owner.
2. More than one insurance policy may be required to comply with the insurance requirements. Endorsement forms appropriate to your insured's contract, lease or permit are checked below and enclosed.
(X) Workers' Compensation/Employers Liability
90 (X) General Liability
(X) Automobile Liability
(X ) Excess/umbrella Liability
( ) Professional Liability
( ) Property insurance
( ) Fine Arts Property Insurance
3. You shall have an authorized representative of the insurance company sign the completed endorsement forms, note his phone number at the bottom of page 2 and have said representative transmit the forms to the Owner. Signatures must be originals as the Owner will not accept facsimile (rubber stamp, photocopy, etc.) or initialed signatures.
4. The name of the Insurance Company underwriting the coverage and its address shall be noted on page 2 of the endorsement form.
5. The "General description of agreement(s) and/or activity(ies) insured" shall include reference to the activity and/or to either the specific Owner contract number, lease number, permit number or construction approval number.
6. The coverages and limits for each type of insurance are specified in the attached sheet of insurance requirements. When coverage is on a scheduled basis, then a separate sheet is to be attached to the endorsement listing such scheduled locations, vehicles, etc., so covered.
7. Endorsements to excess policies will be required when primary insurance is insufficient in complying with the Owner's requirements.
8. If there is insufficient space on the form to note pertinent information, such as inclusions, exclusions or specific provisions, etc., a separate sheet may be attached.
9. When additional sheets are attached, change the number of pages at the bottom of the form.
91 10. Completed Endorsement(s) and questions relating to the required insurance are to be directed to:
Risk Management Department
Project No. 01642
City of Carson
701 E. Carson Street
Carson, CA 90745
(310) 830-7600
11. Improperly completed Endorsements will be returned to your insured for correction by an authorized representative of the insurance company.
12. DELAY IN SUBMITTING PROPERLY COMPLETED ENDORSEMENT
FORMS MAY DELAY YOUR INSURED'S INTENDED OCCUPANCY OR
OPERATION UNDER AGREEMENT WITH THE OWNER.
13. For extensions or renewals of insurance policies which have the Owner's Endorsement Form(s) attached, the Owner will accept a copy of the endorsement (with an original signature) to extend the period of coverage as evidence of continued coverage.
92 EXHIBIT B
GENERAL COMPREHENSIVE LIABILITY ENDORSEMENTS
(SAMPLE)
NAME OF ADDRESS OF INSURED:
General description of agreement(s) and/or activity(ies) insured:
Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or in any endorsement now or hereafter attached thereto, it is agreed as follows:
1. The Owner, consisting of one or both of the following described public entities:
[X] The City of Carson, California
[ ] The Successor Agency to Carson Redevelopment Agency and its or their elected officials, officers, agents and employees are additional insureds thereunder in relation to those activities described generally above with regard to operations performed by or on behalf of the named insured.
2. Such insurance shall be primary, and not contributing with any other insurance maintained by the Owner.
3. The policy to which this endorsement is attached shall apply separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company's liability.
4. Insurance company shall waive subrogation against Owner, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow the first named insured or others providing insurance evidence to waive their right of recovery prior to a loss.
5. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits or non-renewal except after written notice to Risk Management, City of Carson, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereto.
CANCELLATION NOTICE AND ENDORSEMENT TO BE SENT TO:
Risk Management Department
PROJECT NO. 1756
City of Carson
701 E. Carson Street
Carson, CA 90745
(310) 830-7600
93 Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.
Endorsement Effective Policy No.
No. Date
TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF
THIS ENDORSEMENT ATTACHES FROM TO LIABILITY
Scheduled items or locations are to be identified on an attached sheet.
The following inclusions relate to the above coverages:
( ) Premises & Operations ( ) Explosion Hazard
( ) Contractual Liability ( ) Collapse
( ) Independent Contractors ( ) Underground Hazard
( ) Products/Completed Operations ( ) Personal Injury ( ) Broad Form Property Damage ( )
( ) Broad Form Liability Endorsement
A deductible or self-insured retention (strike out one) of applies to coverage.
DEDUCTIBLE APPLIES PER CLAIM , PER OCCURRENCE .
INSURANCE COMPANY
ADDRESS:
I, , (print name) hereby declare under penalty of
perjury, under the laws of the State of California, that I have the authority to bind the above- named insurance company to this endorsement and by my execution hereof, do so bind said company.
Signature of Authorized Representative (Original Signature only; No facsimile signature or initialed signature accepted) Executed at , on , 2020
Phone No.: ( )
94 EXHIBIT C
AUTOMOBILE LIABILITY ENDORSEMENTS
(SAMPLE)
NAME OF ADDRESS OF INSURED:
General description of agreement(s) and/or activity(ies) insured:
Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or in any endorsement now or hereafter attached thereto, it is agreed as follows:
1. The Owner, consisting of one or both of the following described public entities:
[X] The City of Carson, California
[ ] The Successor Agency to Carson Redevelopment Agency and its or their elected officials, officers, agents and employees are insureds thereunder in relation to those activities described generally above with regard to operations performed by or on behalf of the named insured.
2. Such insurance shall be primary, and not contributing with any other insurance maintained by the Owner.
3. The policy to which this endorsement is attached shall apply separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company's liability.
4. Insurance company shall waive subrogation against Owner, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow the first named insured or others providing insurance evidence to waive their right of recovery prior to a loss.
5. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits or non-renewal except after written notice to Risk Management, City of Carson, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereto.
CANCELLATION NOTICE AND ENDORSEMENT TO BE SENT TO:
Risk Management Department
PROJECT NO. 1756
City of Carson
701 E. Carson Street
Carson, CA 90745
(310) 830-7600
95 Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.
Endorsement Effective Policy No.
No. Date
TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF
THIS ENDORSEMENT ATTACHES FROM TO LIABILITY
Scheduled items or locations are to be identified on an attached sheet.
The following are covered by the policy:
( ) Owned Automobiles ( ) Owned, Nonowned and Hired Automobiles ( ) Nonowned Automobiles
( ) Hired Automobiles
A deductible or self-insured retention (strike out one) of applies to coverage.
DEDUCTIBLE APPLIES PER CLAIM , PER OCCURRENCE .
INSURANCE COMPANY
ADDRESS:
I, , (print name) hereby declare under penalty of
perjury, under the laws of the State of California, that I have the authority to bind the above-named insurance company to this endorsement and by my execution hereof, do so bind said company.
Signature of Authorized Representative (Original Signature only; No facsimile signature or initialed signature accepted) Executed at , on , 2023
Phone No.: ( ___ ) ______________
96 EXHIBIT D
WORKERS' COMPENSATION/EMPLOYERS LIABILITY
SPECIAL CANCELLATION NOTICE ENDORSEMENT
(SAMPLE)
NAME AND ADDRESS OF INSURED:
General description of agreement(s) and/or activity(ies) insured:
This policy shall not be subject to cancellation except after notice in writing shall have been sent not less than thirty (30) days prior to the effective date thereof by certified mail, return receipt requested, addressed to Risk Management, City of Carson, P.O. Box 6234, Carson, CA 90749.
The company agrees to waive all rights of subrogation against the Owner, consisting of one or both of the following described public entities:
[X] The City of Carson, California
[ ] The Successor Agency to Carson Redevelopment Agency and its or their elected officials, officers, agents and employees.
Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.
Endorsement Effective Policy No.
No. Date
TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF
THIS ENDORSEMENT ATTACHES FROM TO LIABILITY
Workers' Compensation Statutory
Employers Liability
97 The following are included in the above coverages:
( ) Broad Form All States Endorsement
( ) Voluntary Compensation Endorsement
( )
( )
INSURANCE COMPANY
ADDRESS:
I, , (print name) hereby declare under penalty of
perjury, under the laws of the State of California, that I have the authority to bind the above-named insurance company to this endorsement and by my execution hereof, do so bind said company.
Signature of Authorized Representative (Original Signature only; No facsimile signature or initialed signature accepted) Executed at , on , 2023
Phone No.: ( ___ ) ______________
98 EXHIBIT E
EXCESS LIABILITY INSURANCE ENDORSEMENTS
(SAMPLE)
NAME AND ADDRESS OF INSURED:
General description of agreement(s) and/or activity(ies) insured:
Notwithstanding any inconsistent statement in the policy to which this endorsement is attached or in any endorsement now or hereafter attached thereto, it is agreed as follows:
1. The Owner, consisting of one or both of the following described public entities:
[X] The City of Carson, California
[ ] The Successor Agency to Carson Redevelopment Agency and its or their elected officials, officers, agents and employees are insureds thereunder in relation to those activities described generally above with regard to operations performed by or on behalf of the named insured.
2. Such insurance shall be primary, and not contributing with any other insurance maintained by the Owner.
3. The policy to which this endorsement is attached shall apply separately to each insured against whom claim is made or suit is brought except with respect to the limits of the company's liability.
4. Insurance company shall waive subrogation against Owner, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow the first named insured or others providing insurance evidence to waive their right of recovery prior to a loss.
5. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits or non-renewal except after written notice to Risk Management, City of Carson, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereto.
CANCELLATION NOTICE AND ENDORSEMENT TO BE SENT TO:
Risk Management Department
PROJECT NO. 1756
City of Carson
701 E. Carson Street
Carson, CA 90745
(310) 830-7600
99 Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.
Endorsement Effective Policy No.
No. Date
TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF
THIS ENDORSEMENT ATTACHES FROM TO LIABILITY
AMOUNT EXCESS OF
Excess Liability
( ) Following Form
( ) Umbrella Liability
( ) Other
Applicable underlying coverages
Insurance Company Policy No. Amount
The following inclusions, exclusions, extensions or specific provisions relate to the above coverages:
A deductible or self-insured retention (strike out one) of $ applies to coverages not included in underlying policies.
DEDUCTIBLE APPLIES PER CLAIM , PER OCCURRENCE .
INSURANCE COMPANY
ADDRESS:
I, , (print name) hereby declare under penalty of perjury, under the laws of the State of California, that I have the authority to bind the above-named insurance company to this endorsement and by my execution hereof, do so bind said company.
Signature of Authorized Representative (Original Signature only; No facsimile signature or initialed signature accepted)
Executed at , on , 2023
Phone No.: ( ___ ) ______________
SPECIAL PROVISIONS
PROJECT NO. 1756
Figueroa Street Improvements from Carson Street to Lomita Boulevard SP-ii
SPECIAL PROVISIONS
PROJECT NO. 1756
TABLE OF CONTENTS
Page No.
PREFACE: STANDARDS SPECIFICATIONS AND
STANDARD DRAWINGS SP-1
PART 1 GENERAL PROVISIONS
Section 1: General
1-2 Terms and Definitions SP-1
1-7 Award and Execution of the Contract SP-2
1-7.1 General SP-2
1-7.1.1 Bid SP-2
1-7.1.2 Examination of Plans, Specifications,
and Project Site
SP-2
1-7.1.3 Interpretation of Drawings and Documents SP-3
1-7.1.4 Award of Contract SP-3
1-7.1.5 Execution of Contract SP-4
1-7.1.6 Return of Bid and Guarantee SP-4
Section 2: Scope of the Work
2-2 Permits SP-4
2-4 Cooperation and Collateral Work SP-5
2-4.1 Relations with Other Contractors SP-5
2-10 Disputed Work SP-5
2-10.1 Retention of Imperfect Work SP-5
Section 3: Control of the Work
3-6 The Contractor’s Representative SP-6
3-7 Contract Documents SP-6
3-7.1 General SP-6
3-7.2 Precedence of Contract Documents SP-6
3-10 Surveying SP-7
3-10.1 General SP-7
3-10.3 Line and Grade SP-8
3-10.4 Payment SP-8
SP-iii
TABLE OF CONTENTS – continued Page No.
3-12 Work Site Maintenance SP-8
3-12.1 General SP-8
3-12.1.1 Contractor’s Responsibility for Work SP-9
3-12.4 Storage of Equipment and Materials SP-9
3-12.4.3 Construction Yard SP-9
3-12.6 Water Pollution Control SP-9
3-13 Completion, Acceptance, and Warranty SP-10
3-13.3 Warranty SP-10
3-13.3.1 Warranty of Title SP-10
Section 4: Control of Materials SP-11
Section 5: Legal Relations and Responsibilities SP-11
5-2 Special Notices SP-11
5-3 Labor SP-12
5-4 Insurance SP-12
5-7 Safety SP-16
5-7.9 Edison Energized Conductors SP-16
5-7.10 Emergency Provisions SP-17
Section 6: Prosecution and Progress of the Work
6-1 Construction Schedule and
Commencement of the Work SP-17
6-3 Time of Completion SP-18
6-9 Liquidated Damages SP-18
Section 7: Measurement and Payment
7-2 Lump Sum Work SP-18
7-3 Payment SP-19
7-3.2 Partial and Final Payment SP-19
7-3.9 Work Performed Without Direct Payment SP-19
7-4 Payment for Extra Work SP-19
7-4.3 Markup SP-19
PART 4 EXISTING IMPROVEMENTS
Section 402: Utilities
402-1.2 Payment
402-1.3 Exploratory Excavations
402-4 Relocation
SP-20
SP-20
SP-21
SP-iv
TABLE OF CONTENTS – continued Page No.
PART 6 TEMPORARY TRAFFIC CONTROL
Section 600 Access
600-1 General SP-22
600-2 Vehicular Access
600-2.1 Temporary Steel Plate Bridging
600-2.2 Street Closures, Detours, Barricades
SP-22
SP-22
SP-24
PART 7 STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS
Section 701 Construction
701-17.6 Detectors SP-26
SP-1
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
SPECIAL PROVISIONS
PREFACE: STANDARD SPECIFICATIONS AND STANDARD DRAWINGS The Standard Specifications for Public Works Construction written and promulgated by the Southern California Chapter of the American Public Works Association and the Southern California Districts of the Associated General Contractors of California shall be the Standard Specifications of the Owner. All work shall conform to the latest edition, including supplements, of the Standard Specifications, these Special Provisions which supplement or modify the Standard Specifications, and the Standard Drawings as issued by the Owner available at the time bids are opened, unless otherwise specified in the Contract Documents.
The above-referenced Standard Specifications, Special Provisions, and Standard Drawings are hereby made a part of the Contract Documents.
For the convenience of the Contractor, the section and subsection numbering system used in these Special Provisions corresponds to that used in the Standard Specifications.
Section 1. General
Section 1-2 Terms and Definitions
Whenever in the Standard Specifications the following terms are used, they shall be understood to mean and refer to the following:
(a) AGENCY [
X ] The City of Carson, California
[ ] Successor Agency
acting individually or collectively as the "Owner"
(b) BOARD [ X ] The City of Carson, California
[ ] Successor Agency
acting individually or collectively as the "Owner"
(c) CONTRACT Documents including but not limited to the Bid forms, DOCUMENTS Special Provisions, Technical Provisions, Bonds, Insurance, Contract, Plans, instructions to bidders, and all Addenda setting forth any modifications of the documents. (d) ENGINEER The City Engineer, Public Works Department or his authorized representative.
SP-2
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
(e) BIDDER An individual, co-partnership, association or corporation submitting a Bid for the work contemplated, acting directly or through a duly authorized representative.
(f) LEGAL ADDRESS The legal address of the Contractor to be the address given OF CONTRACTOR on the Contractor's bid and is hereby designated as the place to which all notices, letters or other communications to the Contractor shall be mailed or delivered.
(g) LABORATORY An established laboratory approved and authorized by the Engineer for testing materials and work involved in the contract.
Section 1-7 Award and Execution of the Contract
Section 1-7.1 General
Section 1.7.1.1 Bid
The following is in addition to the provisions of Section 1-7:
The Bid shall be fully executed and submitted on the forms provided by the Owner and shall be delivered as directed in the "Invitation for Bids".
If the Bid is made by an individual it shall be signed and his or her full name and address shall be given; if it is made by a firm it shall be signed with co-partnership name by a general partner thereof, who shall also sign his or her own name, and the name and address of each member of such co-partnership shall be given; if made by a corporation, the name of the corporation shall be signed by its duly authorized officers and attested by the corporate seal.
Bidders are warned against making erasures or alterations of any kind on their Bid. Bids which contain omissions, erasures, alterations, conditions or additions not called for may be rejected.
At the time the Contract is awarded by the Owner the Contractor shall be licensed under the provisions of Chapter 9, Division 3 of the Business and Professions Code of the State of California to do the type of work contemplated in the Contract and shall be skilled and regularly engaged in the general class or type of work required by this Contract.
Section 1-7.1.2 Examination of Plans, Specifications, and Project Site The following is in addition to the provisions of Section 1-7:
Bidders shall read the specifications, examine the drawings and/or locations list, and make their own estimates of the existing facilities and difficulties which will attend the execution of the work called for by the proposed contract, including local conditions, uncertainty of weather, and all other contingencies. Bidders shall satisfy themselves by personal examination of the SP-3
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
locations of the proposed work, and by such other means as they may choose as to actual conditions and requirements and as to the accuracy of the quantities stated in the Bid forms.
Information derived from the maps, plans, specifications, profiles, or drawings, or from the Engineer or his assistants (or the Architects or their assistants), shall not relieve the bidder of this responsibility, and the interpretation of the data disclosed by borings or other preliminary in- vestigations is not guaranteed nor is any liability assumed by the Owner.
Section 1-7.1.3 Interpretation of Drawings and Documents The following is in addition to the provisions of Section 1-7:
If a prospective bidder is in doubt as to the true meaning or intent of any part of the Contract Documents including the Specifications, or discovers discrepancies in, or omissions from, the Specifications or Drawings, he may submit to the Engineer a written request for an interpretation or a correction thereof. Interpretations or corrections of the Contract Documents including the Specifications and Drawings, shall be made only by addendum duly issued by the Engineer, and a copy of such addendum will be sent by certified mail, postage prepaid, or delivered to each person receiving a set of the Contract Documents whose address is known to the Engineer and such addendum shall be considered a part of and incorporated in the Contract Documents.
Section 1-7.1.4 Award of Contract
The following is in addition to the provisions of Section 1-7:
After the Bids have been publicly opened and read aloud, they will be checked for accuracy and compliance with all provisions as specified herein.
The Owner reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective bids received.
Award of the Contract, if it be awarded, will be made by the Owner within 90 days after opening of the bids. Award will be made to the lowest responsive responsible bidder.
In selecting the lowest responsive responsible bidder, consideration will be given to the general competency of the bidder for the performance of the work covered by the Bid. To receive favorable consideration, a bidder may be required to present evidence that he has successfully performed similar work of comparable magnitude or submit other evidence satisfactory to the Owner that he or his associates are personally competent to manage the proposed undertaking and to carry it forward to a successful conclusion. Professional integrity and honesty of purpose shall be essential requirements. A showing of adequate financial resources may be required but will not alone determine whether a bidder is competent to undertake the proposed work.
Only manufacturers or contractors of established reputation, or their duly authorized dealers or agents, having proper facilities for the manufacture of the materials or equipment and for servicing same, or for proper execution of the work called for in the contract, will be considered in making the award.
SP-4
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
Section 1-7.1.5 Execution of Contract
The following is in addition to the provisions of Section 1-7:
A bidder whose Bid is accepted shall properly sign a written contract with the Owner on the form attached hereto and return said contract together with good and approved bonds and insurance certificates and endorsements as required by the Contract Documents within fifteen (15) calendar days from the date of the mailing of a notice from the Owner to the bidder, according to the address given by him, of acceptance of his Bid. Contract bonds and certificates of insurance and endorsements, if required, shall be filed in all instances before delivering any equipment, materials, or performing any work under the contract; also before any purchase order shall be issued. An executed Power of Attorney form shall be submitted with all contract bonds herein specified.
If a bidder whose Bid is accepted fails or refuses to enter into a contract as herein provided, or to conform to any stipulated requirement in connection therewith, the money represented by his check or bidder's bond shall be refunded less the difference between the low bid and the bid of the bidder with whom the Owner enters into an agreement in accordance with the provisions of the Public Contracts Code Section 20174. At the discretion of the Owner an award may be made to the bidder whose Bid is next most acceptable to the Owner, and such bidder and his surety shall fulfill every stipulation embraced herein as if he were the party to whom the first award was made.
A corporation to which an award is made may be required before the contract is finally signed to furnish evidence of its corporate existence, of its right to do business in California, and of the authority of the officer signing the contract and bonds for the corporation to so sign.
Section 1-7.1.6 Return of Bid and Guarantee
The following is in addition to the provisions of Section 1-7:
The check or bond of a bidder to whom the contract has been awarded will be returned to him after all of the acts, for the performance of which said security is required, have been fully performed. The checks or bid bonds of the second and third lowest bidders will be returned when the bidder to whom the contract has been awarded has properly executed all of the required Contract Documents. Checks or bid bonds of other bidders will be returned when their Bids are rejected or in any event at the expiration of ninety (90) days from the date of opening bids.
Section 2. Scope of the Work
Section 2-2 Permits
The following supersedes the provisions of Section 2.2:
SP-5
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
The Contractor will obtain and pay for all permits necessary to perform the Work in streets, highways, railways or other rights-of-way, with exception that the fees for the City’s construction permit which will be waived for this contract.
The Contractor shall also obtain and pay for all costs incurred for permits necessitated by its operations such as, but not limited to, those permits required for night work, overload, blasting, and demolition. The contractor shall pay all business taxes or license fees that are required for the work.
In addition, the Contractor and each subcontractor employed upon the work must have or obtain a valid City of Carson Business License in accordance with the provisions of the Carson Municipal Code. The amount of the business license fee may be obtained from the City’s Finance Department at (310) 952-1748
Section 2-4 Cooperation and Collateral Work
The following is in addition to the provisions of Section 2-4:
2-4.1 Relations with Other Contractors
There may be construction work in progress by others. The Contractor shall coordinate construction activities with other contractors and shall attend coordination meetings as required by the Engineer. The following list provides the construction contact and owner/contractor with their expected construction schedule:
NO. OWNER CONSTRUCTION
CONTACT
CONTRACTOR ANTICIPATED
CONSTRUCTION
TIME FRAME
Section 2-10. Disputed Work
Section 2-10.1 Retention of Imperfect Work
The following is in addition to the provisions of Section 2-10:
If any portion of the work done or materials furnished under the contract proves defective or not in accordance with the specifications and contract drawings, and if the imperfection in the same is not of sufficient magnitude or importance to make the work dangerous or undesirable, or if the removal of such work is impracticable or will create conditions which are dangerous or undesirable in the opinion of the Engineer, the Engineer shall have the right and authority to retain the work instead of requiring it to be removed and reconstructed, but he shall make such deductions therefor in the payment due the Contractor as may be just and reasonable.
SP-6
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
Section 3. Control of the Work
Section 3-6 The Contractor's Representative
The following is in addition to the provisions of Section 3-6:
The Contractor shall furnish the Engineer with the name, address and business and home telephone numbers of the person responsible for the maintenance of barricades, traffic control signs, lights and other safety devices.
Section 3-7 Contract Documents
Section 3-7.1 General
The following is in addition to the provisions of Section 3-7.1:
The Standard Specifications for Public Works Construction and the Standard Plans for Public Works Construction are both promulgated by Public Works Standards, Inc. These publications are available for purchase from BNi Building News, Inc., 1612 South Clementine Street, Anaheim, California 92802, (800) 873-6397,
www.bnibooks.com. These publications are
copyrighted and the City will not provide copies.
Standard Plans of the City of Carson are available for downloading on the internet, http://ci.carson.ca.us/PublicWorks/pwstandards.aspx
Section 3-7.2 Precedence of Contract Documents
The following supersedes the provisions of Section 3-7.2:
The order of precedence of contract documents shall be:
FIRST Requirements of law, including the Code and Ordinances of the City of Carson.
SECOND Permits from other agencies as may be required by law.
THIRD Permits from City of Carson Departments as may be required by law or ordinance.
FOURTH The Contract.
FIFTH The Bid.
SIXTH Addenda.
SP-7
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
SEVENTH Invitation for Bids.
EIGHTH Instructions to Bidders.
NINTH Technical Provisions.
TENTH Construction Plans.
ELEVENTH Special Provisions of the Standard Specifications.
TWELFTH Standard Plans.
THIRTEENTH Standard Specifications for Public Works Construction (current edition) as amended.
FOURTEENTH Reference Specifications.
Change orders, supplemental agreements, and approved revisions to Plans and Specifications will take precedence over documents listed above, except those listed as FIRST, SECOND, and THIRD. Detailed plans shall have precedence over general plans.
Section 3-10 Surveying
The following supersedes the provisions of Section 3-10:
Section 3-10.1 General
Unless otherwise provided in the Technical Provisions, lines and grades for construction shall be the responsibility of the Contractor.
The Contractor is required to locate and tie out survey monuments in the project area prior to construction involving streets and highway, and to file with the County Surveyor a Corner Record of any such work. Prior to the issuance of a completion certificate, the Contractor is required to file a Corner Record for survey monumentation that is replaced. All such survey work shall be performed under the supervision of a California licensed Land Surveyor or a Civil Engineer authorized to perform such work.
The Contractor shall be responsible for protecting all existing horizontal and vertical survey controls, monuments, ties, and benchmarks located within the limits of the project. If any of the above requires removal, relocating, or resetting, the Contractor shall, prior to any construction work and under the supervision of a California-licensed Land Surveyor or Civil Engineer, establish sufficient temporary ties and benchmarks to enable the points to be reset after completion of construction.
SP-8
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
Any ties, monuments, or benchmarks disturbed during construction shall be reset per Los Angeles County standards after construction and the tie notes submitted to the County on 8 ½" x 11" loose leaf paper, after it is signed and recorded at the County Surveyor's Office. The Contractor and its sureties shall be liable for, at their expense, any resurvey required due to Contractor's negligence in protecting existing ties, monuments, benchmarks, or any such horizontal and vertical controls.
The Contractor shall provide the Owner a copy of the office calculations and documents submitted to the County for filing in connection with the aforementioned work.
Section 3-10.2 NOT USED
Section 3-10.3 Line and Grade
All work under this contract shall be built in accordance with the lines and grades shown on the plans. Field survey for establishing these, and for the control of construction, shall be the responsibility of the Contractor. All such surveys, including construction staking, shall be under the supervision of a California-licensed Land Surveyor or Civil Engineer. Staking shall be performed on all items ordinarily requiring grade and alignment, at intervals normally accepted by the agencies and trade involved.
The Contractor shall provide a copy of the office calculations and grade sheets to the Owner's Inspector. The Contractor shall be responsible for any error in the finished work and shall notify the Engineer within 24 hours of any discrepancies or design errors discovered during staking.
Section 3-10.4 Payment
Unless a separate bid item is provided, the payment for surveying, construction staking, related professional services, re-establish centerline ties, office calculations, furnishing all labor, materials, equipment, tools and incidentals, and for doing all work involved shall be considered as included in the various items of work, and no additional compensation will be allowed.
Section 3-12 Work Site Maintenance
Section 3-12.1 General
The following is in addition to the provisions of Section 3-12.1:
The Contractor shall provide and operate a self-loading motor sweeper with spray nozzles every day for the purpose of keeping the entire project site clean as acceptable to the City Engineer.
The Contractor shall keep adjacent properties clean and free of rubbish and debris in a timely manner as necessary and as directed by the Engineer.
Payment for the cleanup and dust control shall be included in the price paid for other items of work. No additional payment will be made for project site maintenance.
SP-9
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
Section 3-12.1.1 Contractor’s Responsibility for Work
Until the formal acceptance of the work by the Owner, the Contractor shall have the charge and care thereof and shall, subject to the insurance protection furnished in accordance with 5-4 hereof, bear the risk of accident, loss or damage to any part thereof by action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work.
The Contractor shall rebuild, repair, restore and otherwise correct damages to any portion of the work occasioned by any of the above causes before its acceptance.
In case of suspension of work from any cause whatever, the Contractor shall be responsible for all materials and the proper temporary storage thereof.
Section 3-12.4 Storage of Equipment and Materials
Section 3-12.4.3 Construction Yard
The following is in addition to the provisions of Section 3-12.4:
The contractor shall be responsible to locate any storage sites for materials and equipment needed and such sites must be approved in advance by the City. When storage sites are located in private properties, the Contractor shall be required to submit to the City written approval from the recorded owner authorizing the use of their property by the Contractor.
Section 3-12.6 Water Pollution Control:
Section 3-12.6.3 Storm Water Pollution Prevention Plan (SWPPP) The following is in addition to the provisions of Section 3-12.6.3:
Storm Water pollution work shall consist of constructing Best Management Practices facilities which may be shown on the Plans, specified elsewhere in these Special Provisions, required by the Standard Specifications, required by National Pollutant Discharge Elimination System (NPDES) permit ordered by the State Water Resources Control Board. Said work is intended to provide prevention, control and abatement of water pollution to streams, waterways and other bodies of water.
In order to provide effective and continuous control of storm water pollution, it may be necessary for the Contractor to perform the contract work in small or multiple units on an out-of-phase schedule and with modified construction procedures. The Contractor shall provide temporary BMP measures including, but not limited to, dikes, basins, ditches and the application of straw and seed bales which become necessary as a result of his operations. The Contractor shall coordinate storm water pollution control work with all other work done on the contract.
Before starting any work on the project, the Contractor shall submit to the Engineer for approval and acceptance a Storm Water Pollution Prevention Plan (SWPPP). SWPPP shall show the SP-10
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
schedule for the erosion control work included in the contract and for all storm water pollution control measures which the Contractor proposes to take in connection with construction of the project to minimize the effect of his operations upon adjacent streams and other water bodies.
The Contractor shall not perform any clearing and grubbing or earthwork on the project, other than that specifically authorized in writing by the Engineer, until such program has been accepted. The Contractor shall revise and bring up to date said storm water pollution control program at any time the Engineer makes written request for such revision.
The Engineer will notify the Contractor of the acceptance or rejection of any submitted or revised SWPPP in not more than five (5) days.
The Owner shall not be liable to the Contractor for failure to accept all or any portion of an originally submitted or revised storm water pollution control program, nor for any delays to the work due to the Contractor's failure to submit an acceptable storm water pollution control program.
Compliance with the requirements of this Section shall in no way relieve the Contractor from his responsibility to comply with the other provisions of the Contract, in particular, his responsibility for damage and for preservation of property.
All storm water pollution control work performed in accordance with the accepted program which is not otherwise required under the contract and which is ordered by the Engineer will be paid for as follows:
(1) Such storm water pollution control work which may be accomplished under the various contract items of work will be measured and paid for as provided for in these Special Provisions for the said items of work. (2) Such storm water pollution control work not covered by contract items will be paid for as extra work as provided for in Section 3-3 "Extra Work" of the Standard Specifications.
Except as otherwise provided in the Standard Specifications or elsewhere in these Special Provisions, full compensation for conforming to the requirements in this section shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed therefore.
Section 3-13 Completion, Acceptance, and Warranty
Section 3-13.3 Warranty
The following is in addition to the provisions of Section 3-13-.3 Section 3-13.3.1 Warranty of Title
SP-11
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
No materials, supplies or equipment for the work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale contract or other agreement by which an interest therein or any part thereof is retained by the seller or supplier. The Contractor warrants clear and good title to all materials, supplies and equipment installed and incorporated in the work, and agrees upon completion of all work to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by him, to the Owner free from any claims, liens, encumbrances or charges, and further agrees that neither he nor any person, firm, or corporation furnishing any material or labor for work covered by the Contract shall have any right to a lien upon the premises or any improvement or appurtenance thereon; provided, that this shall not preclude the Contractor from installing metering devices or other equipment of utility companies the title of which is commonly retained by the utility company. Nothing contained in this section, however, shall defeat or impair the right of such persons furnishing materials or labor under any bond given by the Contractor for their protection, or any right under any law permitting such persons to look to funds due the Contractor, which are in the hands of the Owner. The provisions of this section shall be inserted in all subcontractor's and material contracts, and notice of its provisions shall be given to all persons furnishing materials for the work when no formal contract is entered into regarding such materials.
Section 4. Control of Materials
Section 4-4 Testing
The following is in addition to the provisions of Section 4-4:
Testing of the complete traffic signal cabinet assembly including but not limited to the controller, battery back-up system, wireless communication equipment, etc. shall be delivered, tested and approved by the LA County Traffic Signal Shop prior to installation.
Typical testing time is 30-40 days. The material testing laboratory is located at:
Los Angeles County
Department of Public Works
Traffic Signal Shop
1525 Alcazar Street
Los Angeles CA 90033
The contractor shall make delivery arrangements with the Traffic Signal Shop 48 hours in advance by calling (626) 458-1704.
Section 5. Legal Relations and Responsibilities
Section 5.2 Special Notices
The following supersedes the provisions of Section 5-2:
SP-12
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
Any notice required or given by one party to the other under the Contract shall be in writing and shall be dated and signed by the party giving such notice or by a duly authorized representative of such party. Any such notice shall not be effective for any purpose whatever unless served in the following manner:
Notice shall be given to the Owner by personal delivery thereof to the Owner's Engineer or by depositing the same in the United States mail enclosed in a sealed envelope, registered and with postage prepaid, addressed to:
c/o Engineering Services
Public Works Department (PWD)
City of Carson
701 East Carson Street
Carson, CA 90745
Notice shall be given to the Contractor by personal delivery thereof to said Contractor or to his authorized representative at the site of the project, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to said Contractor at the address established for the conduct of the work under this Contract, postage prepaid and registered.
Notice shall be given to the Surety, or any other person, by personal delivery to said Surety or other person, or by depositing the same in the United States Mail, enclosed in a sealed envelope addressed to such Surety or persons at the address of said Surety or persons last communicated to the party giving the notice, postage prepaid and registered.
Section 5.3 Labor
The following is in addition to the provisions of Section 5-3:
Each bidder must submit with their Bid a fully executed Certificate of Non-Discrimination by Contractors. Bids will not be considered unless accompanied by the completed Certificate.
After the opening of bids and the determination of the low bidder, said low bidder shall submit to the Engineering Services (PWD), not later than 5:00 P.M. on the third working day following the bid opening, a completed "Fair Employment Practices Contractor Compliance Report." The Contractor shall insert a provision in all subcontracts requiring subcontractors to comply with this section.
Section 5-4 Insurance
The following supersedes the provisions of Section 5-4:
The Contractor shall, at his expense, maintain in effect at all times during the performance of work under the Contract not less than the following coverage and limits of insurance and shall be subject to approval by the City's Risk Manager:
SP-13
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
Contractor shall procure and maintain for the duration of the contract, and for 5 years thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.
Coverage shall be at least as broad as:
(a) General liability insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $5,000,000 per occurrence, $10,000,000 general aggregate, for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
(b) Automobile liability insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Services to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $2,000,000 combined single limit for each accident. (c) Workers’ compensation insurance. Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000).
(d) Builder’s Risk Insurance. Contractor shall maintain Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions or provisional limit provisions. The policy must include: (1) coverage for any ensuing loss from faulty workmanship, nonconforming work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the project; (4) ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) ocean marine cargo coverage insuring any project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the project site or any staging area.
If the Project does not involve new or major reconstruction, then at the option of City, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the work, including during transit, installation, and testing at the Project site.
SP-14
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
(e) Pollution Liability Insurance. Contractor shall maintain Environmental Impairment Liability insurance, written on a Contractor’s Pollution Liability form or other form acceptable to City providing coverage for liability arising out of sudden, accidental, and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.
Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer.
If Contractor maintains broader coverage and/or higher limits than the minimums shown above, City requires and shall be entitled to the broader coverage and/or the higher limits maintained by Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.
(f) Surety Bonds as described below.
If the contractor maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. At the option of the City, either: the contractor shall cause the insurer to reduce or eliminate such self-insured retentions as respects the City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration, and defense expenses. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
SP-15
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
1. Carson Successor Agency, City of Carson, their elected and appointed officers, officials, employees, volunteers and agents are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).
2. For any claims related to this project, the Contractor’s insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects Carson Successor Agency, City of Carson, their elected and appointed officers, officials, employees, volunteers and agents. Any insurance or self-insurance maintained by the Carson Successor Agency, City of Carson, their elected and appointed officers, officials, employees, volunteers and agents shall be excess of the Contractor’s insurance and shall not contribute with it.
3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the City.
Builder’s Risk (Course of Construction) Insurance
Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City as a loss payee as their interest may appear.
If the project does not involve new or major reconstruction, at the option of the City, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City site.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to the City.
Waiver of Subrogation
Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ SP-16
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors.
Verification of Coverage
Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.
Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance meeting all requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13.
Surety Bonds
Contractor shall provide the following Surety Bonds:
1. Bid Bond
2. Performance Bond
3. Payment Bond
4. Maintenance Bond
The Payment Bond and the Performance Bond shall be in a sum equal to the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.
Section 5-7 Safety
Section 5-7.9 Southern California Edison Energized Conductors The following is in addition to the provisions of Section 5-7:
Contractor hereby promises and agrees that in the performance of the work specified in this Contract, it will employ and utilize only qualified persons, as hereinafter defined, to work in SP-17
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
proximity to Edison's secondary, primary and transmission facilities. The term "qualified person" is defined in Title 8, California Administrative Code, Section 2700, as follows:
"Qualified Person - A person who by reason of experience or instruction is familiar with the operation to be performed and the hazards involved."
Contractor further promises and agrees that the provisions of this section shall be and are binding upon any subcontractor or subcontractors that may be retained by it, and that Contractor shall take such steps as are necessary to assure compliance by said subcontractor or subcontractors with the requirements of this section.
Section 5-7.10 Emergency Provisions
The following is in addition to the provisions of Section 5-7:
Unusual conditions may arise on the work which will require that immediate and unusual provision be made to protect the public from danger or loss or damage to life and property, due directly or indirectly to the prosecution of the work, and it is part of the service required of the Contractor to make such provisions and to furnish such protection.
Whenever, in the opinion of the Owner, an emergency exists of which the Owner is aware and against which the Contractor has not taken sufficient precaution for the safety of the public or the protection of utilities or of adjacent structures or property which may be injured by the progress of construction; and whenever, in the opinion of the Owner, immediate action shall be considered necessary in order to protect public or private personnel or property interests, or prevent likely loss of human life or damage on account of the operations under the Contract, then in that event the Owner may provide suitable protection to said interests by causing such work to be done and material to be furnished, as in the opinion of the Owner may seem reasonable and necessary, all at the expense of the Contractor.
Section 6. Prosecution and Progress of the Work
Section 6-1: Construction Schedule and Commencement of the Work The first sentence of Section 6-1 shall be deleted and replaced with:
The Contractor shall submit within one week after award of the work, its proposed construction schedule to the Engineer for approval.
The following is in addition to the provisions of Section 6-1:
The engineer shall mail to the contractor three copies of the contract for execution within approximately one week of award. The Contractor shall execute and return the contract together with the appropriate bonds and proof of insurance within fifteen (15) calendar days of receipt of said contract. Unless otherwise provided by the approved construction schedule the engineer SP-18
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
shall issue the notice to proceed on the date that the fully executed contracts are received from the Contractor.
Section 6-3 Time of Completion
The following is in addition to the provisions of Section 6-3:
The Contractor's working hours shall be limited to the hours between 8:00 A.M. and 3:00 P.M., working hours in Arterial Streets shall be limited to the hours between 9:00 A.M. and 3:00 P.M., weekdays, excluding recognized holidays. Deviation from normal working hours will not be allowed without prior written consent of the Engineer. The Contractor shall provide adequate light for proper prosecution of the work, for the safety of the workmen and the public, and for proper inspection.
The Contractor shall notify the Engineer of the City of Carson two working days (48-hours) in advance of the start of construction.
In the event work is allowed by the Engineer of the City of Carson outside of the normal working hours, at the request of and for the benefit of the Contractor, inspection service fees will be levied against the Contractor at a rate of $161.25 per hour, plus travel time where applicable.
The above charge may also be levied if non-routine inspection services are deemed necessary by the Engineer of the City of Carson.
If the Engineer of the City of Carson allows night work, the Contractor shall provide adequate light for proper prosecution of the work, for the safety of the workmen and public, and for proper inspection.
Section 6-9 Liquidated Damages:
The following is in addition to the provisions of section 6-9:
The amount of liquidated damages is hereby amended to $1,000 for each consecutive calendar day.
Section 7. Measurement and Payment
Section 7-2 Lump Sum Work
The following is in addition to the provisions of section 7-2:
The Contractor shall submit to the City a cost breakdown of the lump sum bid items, called the "Schedule of Values," in a form approved by the City. The Schedule of Values, when approved by the City, shall become the basis for determining the cost of Work requested on the Contractor's Applications for Payment. The Contractor shall submit a statement based upon this SP-19
PROJECT NO. 1756 SPECIAL PROVISIONS - GENERAL
breakdown, and if required, itemized in such form and supported by such evidence as the Construction Manager may direct, showing the Contractor's right to the payment claimed.
Section 7-3 Payment
Section 7-3.2 Partial and Final Payment
The following is in addition to the provisions of 7-3.2:
The closure date for periodic progress payments will be the twenty-fifth day of each month.
Authorization to pay is commonly received on the tenth day of the following month. However, Payments will be withheld pending receipt of any outstanding reports required by the Contract Documents.
Section 7-3.9 Work Performed Without Direct Payment
The following is in addition to the provisions of Section 7-3:
Regarding tools and materials of any class for which no price is fixed in the Bid, it shall be understood that such work, equipment, labor, tools and materials shall be provided without extra charge, allowance, or direct payment of any kind. The cost of performing such work or furnishing such equipment, labor, tools and materials shall be included in the unit bid prices in the Bid and no additional compensation will be paid therefore.
Section 7-4 Payment for Extra Work
Section 7-4.3 Markup
The following percentage shall apply to provision 7-4.3:
1. Labor 20%
2. Materials 15%
3. Equipment 15%
4. Other Items and Expenditures 10%
SP-20
PROJECT NO. 1756 SPECIAL PROVISIONS – PART 4
SPECIAL PROVISIONS
PART 4
EXISTING IMPROVEMENTS
Section 402. Utilities
Section 402-1 Location.
Section 402-1.2 Payment. (Page 481 of the SSPWC)
Replace the entire subsection with the following:
No separate payment will be made for the location of utilities pursuant to Government Code Sections 4215 and 4216, and 402-1.1, or for attendance at the preconstruction meeting.
Payment shall be considered as included in the Contract Unit Price for the various Bid items.
Add the following subsection:
402-1.3 Exploratory Excavations. In addition to the requirements of 402-1.1 for utilities shown on the Plans, the Contractor shall locate unknown subsurface utilities marked or otherwise identified as ordered by the Engineer in accordance with 402-1.1. Exploratory excavations for unknown subsurface utilities will be measured by each.
TABLE 402-1.3
AC 6" max.
Thickness
PCC 8"
max.
Thickness
COMPOSITE
(AC over PCC)
4" over 8" max.
Thickness
AC 6" max.
Thickness
PCC 6"
max.
Thickness
NATIVE
0'-3' $750 $900 $1,050 $600 $750 $450
3'-6' $900 $1,050 $1,200 $750 $900 $600
6'-9' $1,050 $1,200 $1,350 $900 $1,050 $750
9'-12' $1,200 $1,350 $1,500 $1,050 $1,200 $900
ROADWAY PARKWAY (NOT IN ROADWAY)
DEPTH
max.
Payment for exploratory excavations for unknown subsurface installations including excavation, backfill, surface restoration, and all other incidentals necessary to complete the work will be made at the Stipulated Unit Price in Table 402-1.3 for the maximum depth and surface material encountered. Exploratory excavations which are greater than 5 feet in depth or where the surface material thickness is greater than those listed in Table 402-1.3 will be considered as Extra Work.
No markup is to be added to the Stipulated Unit Price of exploratory excavations.
Payment for exploratory excavations will be made under the Allowance Bid item.
SP-21
PROJECT NO. 1756 SPECIAL PROVISIONS – PART 4
Section 402-4 Relocation
Add the following to the provisions of Section 402-4:
The owner does not necessarily mark water services. The Contractor shall assume that a water service exists at each water meter box and the service connection lies at any depth within 36” of either side of the water meter box measured parallel to the curb face.
The Contractor shall procure a plumber and pay all fees to repair or replace water services damaged by his operation when his operation is within 36” of either side of a water meter box measured parallel to the curb face.
The Contractor shall procure a plumber and shall be reimbursed for the costs to relocate or repair interfering water services located outside 36” of either side of a water meter box measured parallel to the curb face.
If water service is interrupted, a Contractor’s English-speaking representative shall remain on the job until water service is resumed. The Contractor shall provide 2.5 gallons of a brand name bottled drinking water to any resident whose water service has been interrupted, immediately upon inspector’s request. Water service shall not remain interrupted for more than three hours.
SP - 22
PROJECT NO. 1756 SPECIAL PROVISIONS – PART 6
SPECIAL PROVISIONS
PART 6
TEMPORARY TRAFFIC CONTROL
Section 600. Access
Section 600-1 General
The following is in addition to the provisions of Section 600-1:
The Contractor shall provide temporary "No Parking" and all other signs which are necessary for the safe and orderly conduct of vehicular traffic as directed by the Engineer and as specified herein. He shall also provide a barricaded area in the parking lane for pedestrian traffic during such time as the parkway is unfit to be used for pedestrian traffic.
At such times as driveways are inaccessible due to the Contractor's work they shall be blocked by two Class II barricades or one Class II barricade and two delineators. Driveways that are ramped or planked for temporary access shall be provided with a barricade or delineator at each side. The Contractor shall give 24-hour notice to affected property owners prior to blocking any driveway.
The Contractor shall provide access for refuse collection on the regularly scheduled days. He shall also facilitate or assist in the collection where such work is hampered by his operations.
The construction area shall be cleaned by the use of a mobile broom sweeper daily to the satisfaction of the Engineer. The stockpiling of construction debris will not be allowed .
Section 600-2 Vehicular Access
The following provisions shall be added to Section 600-2:
600-2.1 Temporary Steel Plate Bridging:
When backfilling operation of an excavation in the travel way, whether transverse or longitudinal cannot be properly completed within a work day, steel plate bridging with a non-skid surface and shoring may be required to preserve unobstructed traffic flow. In such cases, the following shall apply:
1. Steel plate used for bridging must extend a minimum of twelve (12") inches beyond the edge of the trench.
2. Steel plate bridging shall be installed to operate with minimum noise.
SP - 23
PROJECT NO. 1756 SPECIAL PROVISIONS – PART 6
3. The trench shall be adequate to support the bridging and the traffic load.
Contractor shall be responsible for determining whether shoring is necessary.
4. Temporary paving with cold asphalt concrete shall be used to feather the edges of the plate.
5. Bridging shall be secured against displacement by adjustable cleats, shims, or other devices.
Approaches plate and ending plate (if longitudinal placement) shall be attached to the roadway by a minimum of two (2) dowels pre-drilled into the corners of the plate and drilled two (2") inches into the pavement. Subsequent plates are butted to each other. Fine graded asphalt concrete shall be compacted to form ramps, maximum slope of 8.5% with a minimum of twelve (12") inches taper to cover all edges of the steel plates. When steel plates are removed, the dowel holes in the pavement shall be backfilled with either fines of asphalt concrete mix, concrete slurry or equivalent slurry satisfactory to the Engineer.
The Contractor shall be responsible for maintenance of the steel plates, shoring, and asphalt concrete ramps.
Unless specified, use of steel plate bridging at any given location should not exceed four (4) consecutive working days in any given week. Backfilling of excavation shall be covered with a minimum of three (3") inches of temporary layer of cold asphalt concrete.
The following table shows the required minimal thickness of steel plate bridging for a given trench width:
Trench Width Minimum Plate Thickness
1.0 foot 1/2 inch
1.5 foot 3/4 inch
2.0 feet 7/8 inch
3.0 feet 1 inch
4.0 feet 11/4 inch
For spans greater than four (4') feet, a structural design for the steel plate bridging shall be prepared by a registered civil engineer and approved by the Engineer. Steel plate bridging shall be designed for HS20-44 truck loading per Caltrans Bridge Design Specifications Manual. The Contractor shall maintain steel plates with a non-skid surface having a minimum coefficient of friction equivalent to
0.35 as determined by California Test Method 342. The contractor may use standard steel plate with known coefficient of friction equal or exceeding 0.35.
A Rough Road sign (W33) with black lettering on an orange background shall be used in advanced of steel plate bridging. This is to be used along with any other required construction signing.
Payment for steel plate bridging shall be included in the other items of work involved and no additional payment will be allowed therefore.
SP - 24
PROJECT NO. 1756 SPECIAL PROVISIONS – PART 6
600-2.2 Street Closures, Detours, Barricades:
The Contractor shall not close any street within the City of Carson without first obtaining the approval of the Engineer. Barricading, traffic control and detour diagrams in connection with street closures shall be submitted by the Contractor as required by the Engineer.
Street closures, detours, lane closures, signs, lights and other traffic control devices shall conform to the latest approved version of the California Manual on Uniform Traffic Control Devices (California MUTCD). The California MUTCD is available at the following address:
https://dot.ca.gov/programs/traffic-operations/camutcd
The Contractor shall provide and maintain Class II barricades along excavation edges parallel to the flow of traffic at a spacing of twenty-five feet. Class II barricades mounted with flashers shall be installed around work areas in parkways. Class II barricades shall have alternating black and reflective white (or yellow) stripes at an angle of 45 degrees. The stripe width shall be four to six inches.
During paving operations barricades may be supplemented with minimum size eighteen- inch-high traffic cones and delineators such that spacing between barricades and/or cones or delineators is no greater than twenty feet. At all access points such as intersecting streets, alleys and driveways, barricades and/or cones shall be provided at five-foot intervals so as to prevent vehicular access to the paving area. Where access from an intersecting street is prohibited, a "Road Closed" sign shall be provided at the nearest prior intersection. "No Left Turn" signs shall be provided wherever required by the Engineer.
When one-way access from a side street or alley is permitted, barricades and cones shall be provided at five-foot intervals for a distance of fifty feet on either side of the centerline of the intersecting street or alley.
Should the Contractor fail to furnish a sufficient number of traffic and/or pedestrian safety devices, the Owner will place such necessary items and the Contractor shall be liable to the Owner for providing such devices in accordance with the following provisions:
1. For placing of barricades - $5.00 per barricade for the first day or any part thereof and $3.00 per barricade per day for each day thereafter or any part thereof.
For flashers - $3.00 per flasher for the first day or any part thereof and $1.00 per flasher per day for each day thereafter or any part thereof.
For traffic cones - $3.00 per cone for each day or any part thereof.
2. In the event that the services of the Owner are required between the hours of 3:00 P.M. and 8:00 A.M.,
during the normal week or at any
SP - 25
PROJECT NO. 1756 SPECIAL PROVISIONS – PART 6
time on a Saturday, Sunday, or a City holiday, there shall be an additional charge to the above set forth minimums of $161.25 for each service trip required.
Contractor shall relocate, preserve and maintain the visibility of all existing signs within the project limits which affect the flow of traffic, as directed by the Engineer. Any signs which are damaged or found to be missing during the course of construction shall be replaced by the Contractor at his expense as directed by the Engineer. All other signs that interfere with the course of work and are not necessary for the safe flow of traffic will be removed and replaced by the Owner. Traffic control signs include Stop Signs, Speed Limit, Parking Restrictions and other regulatory signs.
SP - 26
PROJECT NO. 1756 SPECIAL PROVISIONS – PART 7
SPECIAL PROVISIONS
PART 7
SECTION 701 – CONSTRUCTION
701-17.6 Detectors.
701-17.6.3 Inductive Loop Detectors.
701-17.6.3.2 Installation. Replace subparagraph b) with the following:
b) Detector loops, and their leads to the nearest pull box, shall be a continuous conductor of No. 12 AWG strand tinned copper wire; having 600V Type USE cross-linked polyethylene insulation with a minimum thickness of 3/64 inch (1.2 mm).
Add the following after subparagraph c):
d) Saw-cuts may be into either asphalt concrete (AC) or Portland cement concrete (PCC) pavement. The saw-cut or slot shall conform to the Bicycle Vehicle Detector Installation Standard Plan included at the end of these Special Provisions for both types of pavements unless otherwise specified.
e) Loops shall be 6-foot (1.8 m) diameter round loops unless otherwise shown on the Plans.
f) The distance between the side of a loop and a lead-in saw cut from adjacent detectors shall be 24 inches (600 mm) minimum. The distance between lead-in saw cuts shall be 6 inches (150 mm) minimum.
g) The loop lead-in conductors shall be twisted together before being placed in the slot and conduit. The width of the lead-in saw cut shall be at least twice the diameter of the lead- in conductor.
h) Inductive loops that are to be connected to the same detector lead-in cable shall be spliced in series unless otherwise specified on the Plans. i) Adjacent loops on the same sensor unit channel shall be wound in opposite directions.
TECHNICAL PROVISIONS
PROJECT NO. 1756:
Figueroa Street Improvements from Carson Street to Lomita Boulevard PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-2
TABLE OF CONTENTS
Item Page no.
A. GENERAL NATURE OF WORK TP-3
B. TECHNICAL SPECIFICATIONS TP-4
C. TIME OF COMPLETION TP-4
D. COORDINATION WITH UTILITIES AND OTHER AGENCIES TP -4 E. PUBLIC CONVENIENCE AND SAFETY (TRAFFIC CONTROL) T P-5 F. DEFINITION OF BID ITEMS TP-6
#1 Bonding, Mobilization & Insurance
#2 Survey And Monumentation, Re-Setting Centerline Ties #3 Traffic Control
#4 Traffic Stripes, Markings Legends, Markers & TOMs
#5 Cold Mill AC Pavement 2”
#6 Asphalt Rubber (ARHM) Finish Course
#7, #8 Dig-Out Section
#9 Slurry Seal
#10 Remove and Construct Access Curb Ramps
#11 Truncated Dome Panels
#12 Sidewalk
#13 Driveways
#14 Curb/Gutter
#15 Cross Gutter and Spandrel
#16 Remove and Replace Concrete Pavement
#17 Remove and Replace Concrete Pavement
#18 Private Driveways PCC Improvements
#19 Private Driveways AC Improvements
#20 Traffic Loop Vehicle Detectors
#21 Manhole & Vault Adjustments
#22 Utility Cover Adjustments
#23 Replacement of Catch Basin Lid and Local Depression #24 Unsuitable Material
#25 Saturated Soil
#26 Allowance
Various Items
General
Clearing and Grubbing
Unclassified Excavation
Aggregate Base
APPENDICES …………………………………………………………………………….
Plans …………...………………………………………… A
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-3
TECHNICAL PROVISIONS
PROJECT NO. 1756
PROJECT NO. 1756: Figueroa Street Improvements from Carson Street to Lomita Boulevard
A. GENERAL NATURE OF WORK
The work to be performed under this contract for Project No. 1756 is described below.
The work to be performed under this contract consists of:
Remove and Replace damaged concrete improvements or install new PCC on Figueroa Street from Carson Street to Lomita Boulevard and on Sepulveda Boulevard from Figueroa Street to the 110 Freeway; Grind and Overlay of road pavement on Figueroa Street from Carson Street to Lomita Boulevard and on Sepulveda Boulevard from Figueroa Street to the 110 Freeway with Asphalt Rubberized Hot Mix (ARHM).
Work includes furnishing all labor, material, equipment, services, and incidentals required for PCC improvements removals and replacement; cold milling full width AC surface 2” in thickness, and overlay with ARHM Finishing Course 2” in thickness; also, includes removal and replacement “Dig-Out” of localized failed 6” AC sections or 10” AC on CAB sections at specified locations, compacting existing CAB Base to min. 95% relative compaction; and reconstruct these sections by laying 6” AC Base Course or 6” AC Base Course on 4” CAB Course at specified locations; also, includes overlay with ARHM Finish Course surface; PCC Driveways and Curb Ramps removals and replacements, adjust manhole covers, utilities valve covers to grade; cleaning road surface, installation of temporary pavement markers replacing raised markers, applying traffic striping, marking and legends; and other related work.
I. Order of Work and Required Durations - Order of work and maximum duration between start and stop of each type of work shall conform to the provisions of Section 6-1, "Construction Schedule and Commencement of Work", of the Standard Specifications and these Special Provisions and as noted below.
The following sequence of work and scheduling restrictions have been identified to describe the required order and duration of construction phases.
Phase 1: Portland Cement Concrete (PCC) removals and replacement of concrete improvements.
o Driveways: Access shall be maintained at the end of each working day.
Replacement of driveway shall occur within 5 working days of the removals and shall not remain open over a weekend. Plating of driveways at the end of each working day will be required to allow access.
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-4
o Sidewalk, Curbs, & Curb Ramps: Replacement of sidewalk and curb ramps shall occur within 5 working days of the removals and shall not remain open over a weekend. Pedestrian traffic control shall be installed by the contractor to maintain the path of travel.
o Cross gutters: Contractor shall maintain access at all intersections during the course of construction and shall phase the construction of cross gutters at each intersection. Plating of the cross gutter will be required during curing period as part of the assumed unit pricing. Cross gutters must be completed within 5 working days of starting demolition of the given cross gutter and shall not be left open over the weekend.
Phase 2: Work related to pavement grinding, subbase rehabilitation and overlay, etc.
o Final ARHM Overlay shall be installed no more than 10 working days after the cold milling operation for each segment of roadway. Contractor shall not be allowed to mill more roadway surface than can be patched and final paved within the given timeframe.
o Roadway patching shall be conducted AFTER the roadway milling operation.
The Contractor will not be allowed to excavate more patches than can be paved in the same day of work. No patches shall be left open at the end of a work day and all lanes of traffic shall be opened at the end of each work day. Temporary striping will be required for the entire duration that the pavement surface remains unpaved.
All work shown/described in Project No. 1756 Figueroa Street from 223 rd Street to Lomita
Boulevard shall conform to the City of Carson Standard Drawings, the latest edition of the Standard Specifications, Caltrans Standard Specifications, and these Specifications.
B. TECHNICAL SPECIFICATIONS
The following Technical Provisions supplement and amend the Standard Specifications for Public Works Construction, 2018 Edition. As a reference convenience, these Special Provisions have been arranged into a format which parallels the Standard Specifications.
C. TIME OF COMPLETION
The Contract time of completion shall be 90 working days from the date of issuance of “Notice to Proceed”, as specified in the Bidding Schedule. Long lead-time materials shall be ordered within 7 days from receiving the “Notice to Proceed.”
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-5
D. COORDINATION WITH UTILITIES AND OTHER AGENCIES
The Contractor shall notify the Engineer of the City of Carson, Sheriff's Department, Fire Department, Refuse Collection Service, METRO (MTA), Torrance Transit, and Carson Circuit of any street closures two working days (48-hours) prior to the start of construction.
Agencies ....................................................................................................................... Phone Nos.
Contract Administrator - Jesus Sanchez ................................................. (310) 952-1700 ext. 1380 City’s Tree Maintenance Supervisor (Gregory MacDonald) .................................. (310) 847-3520 Carson Sheriff’s Station .......................................................................................... (310) 830-1123 Carson Fire Station ................................................................................................. (310) 638-6121 Waste Management ................................................................................................. (310) 328-0900 EDCO Waste Services ............................................................................................ (310) 540-2977 MTA (RTD) ............................................................................................................ (213) 972-4644 Torrance Transit ................................................................................... (310) 618-6266 / 781-6920 Carson Circuit .......................................................................................... (310) 835-0212 ext.1781 California Water Service Company ........................................................................ (310) 257-1479 Golden State Water Company ................................................................................ (310) 660-0320 Southern California Gas Company ......................................................................... (310) 687-2032 Southern California Edison Co. (SCE) ................................................................... (310) 608-5001 McCormick Ambulance .......................................................................................... (310) 349-8900 Metro Fiber Networks, Inc ...................................................................................... (757) 890-0143 Century ...................................................................................... (800) 244-1111 & (800) 788 3600 Dig Alert ............................................................................................................................... 811 Affected Utilities
The Contractor shall notify Dig Alert, and all affected public utilities two working days (48- hours) in advance of any excavation in the vicinity of their facilities.
If the Contractor finds evidence of utilities not shown on the Plans, he/she shall notify the Owner immediately.
Compensation for notifications to and coordination with other agencies shall be included in the various bid prices in the Proposal and no additional compensation shall be allowed therefore.
E. PUBLIC CONVENIENCE AND SAFETY (TRAFFIC CONTROL)
Traffic control and all traffic signs and devices shall conform to the State of California, Department of Transportation, “Manual on Uniform Traffic Control Devices.” The Contract requires this to be accomplished in ac cordance with the provisions of Part 6 – Temporary Traffic Control of the Standard Specifica tions for Public Works Construction, latest edition, and the special provisions, unless otherwise approved by the Engineer of the City of Carson and except as modified and supplemented below:
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-6
Traffic Control Plans/Construction Staging Plans/ Temporary Signal Plans – The Contractor shall submit a traffic control plan and a temporary signal plan to be used during the signal work that is prepared on 24” x 36” sheets, stamped and signed by a California Registered Traffic Engineer to the City of Carson City Engineer for review and approval at least fourteen (14) calendar days prior to commencing any work, unless otherwise approved by City Engineer. Said plan shall indicate the locations of all signing, barricades, flashing arrow signs, delineators, lane closures, temporary lane lines, etc. required to control traffic and detours during construction.
The use of flagmen or women should be clearly indicated on traffic control plans when working on one-way streets or other applicable roadway conditions. All such devices shall be removed from the view of traffic when not required and shall not be stored in the public right-of-way.
No work shall be started by the Contractor until all necessary traffic control signs are on the jobsite and have been approved by the City Engineer, or his field representative.
Parking Restrictions: Parking within the area of improvement may be restricted during construction operations. Temporary "No Parking" signs shall be provided and posted by the Contractor three working days (72-hours) in advance of construction. The "No Parking" signs shall clearly state the date and hours during which the restriction is effective. Permission and requirements shall be obtained from the Engineer of the City of Carson for any "No Parking" signs to be posted on existing trees, utility poles, and traffic signs.
Notification to Businesses and Residences: All adjacent businesses and residences shall be duly notified by the Contractor, in writing, of his proposed operation. Notice shall be delivered at least two working days prior to start of construction. Upon written notification by the Contractor at least five days prior to the date needed for “Notice Circulation”, the owner will prepare a letter for this purpose. The Contractor shall be responsible for reproduction and distribution of the letters. Re-notifications will be required if the Contractor’s schedule is altered.
Street Closures/Full or Partial: The Contractor shall be allowed to close certain lanes of the streets for a period of not more than 20 working days and must maintain access to residents and businesses on all sides of the streets. The contractor shall provide one traffic lane in each direction at all times.
Drive Approaches: Drive approaches/access to all driveways in the area of construction shall remain open and accessible during non-working hours. The contractor shall keep open all driveways except for short periods of time as outlined in Part 6 of the Standard Specifications for Public Works Construction.
Observation of Job Site: The Contractor shall assign a person to drive and observe the job site at least once a day during weekends and holidays to ensure that the safety of the public, both motoring and pedestrian, is maintained. The name and telephone number of the person assigned shall be supplied to the Engineer of the City of Carson prior to start of any work.
Full compensation for conforming to the requirement of this provision shall be considered as included in the contract price paid for the various items of work and no additional compensation will be allowed.
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-7
F. DEFINITION OF BID ITEMS
The lump sum and unit prices to be paid for the items listed in the Bid and as defined herein shall be considered full compensation for furnishing all labor, materials, tools, and equipment, and doing all work involved in furnishing and installing the materials complete and in place, in accordance with the details shown on the Plans, as specified herein, and as directed by the Engineer of the City of Carson.
All incidental work which is neither shown on the Plans nor otherwise specified, and which is necessary to complete the construction of improvements as shown on the Plans and as specified herein, shall be furnished and installed as though such work were shown on the Plans or specified, and no additional compensation will be allowed therefore.
Existing improvements in areas adjoining the property wherein demolition and removal is being performed shall be protected from injury or damage resulting from operations of the Contractor and the Contractor shall be responsible for such damage. In a like manner any building, structure, grass, tree, shrub, irrigation system or other item on the property where demolition and removal is being performed shall be similarly protected and preserved or replaced in kind by and at the Contractor’s expense.
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-8
PROJECT NO. 1756: Figueroa Street Improvements from Carson Street to Lomita Boulevard
BID ITEM NO. 1: BONDING, INSURANCE, AND MOBILIZATION (CARSON
GENERAL CONDITIONS)
Contractor shall provide necessary bonds, insurance, financing, moving equipment to the job site, establish storage areas, demobilization and preparing an approved work schedule and other documents and plans as required.
Payment for these items shall be at the contract lump sum price and no additional compensation will be allowed. The total cost for this bid item shall not exceed 10% of the total contract amount. The City will make the necessary adjustment to determine the total amount bid based on the arithmetically correct Bid.
BID ITEM NO. 2: SURVEY AND MONUMENTATION, INCLUDING RE-SETTING
CENTERLINE TIES AND PERMANENT SURVEY MARKERS
The Contractor shall be responsible to provide all required construction staking, monument preservation, monument replacement, survey control, grade staking and all related survey work required by these specifications, the standard specifications and the direction of the Engineer as necessary to construct the work. The contractor shall provide to the Engineer copies of all cut sheets, survey notes, pad or grade certifications as requested. The contractor through its surveyor shall check the grades and alignment to ensure conformity with the plans and shall notify the Engineer immediately of any discrepancy, error or conflict.
The Contractor shall notify the Engineer, or the owner on Private Contracts, at least 7 days before starting work to allow for the preservation of survey monuments, property line and corner survey markers and benchmarks. The Contractor at their cost, shall file Corner Record referencing survey monuments subject to disturbance in the office of the County Surveyor prior to the start of construction and also prior to the completion for the replacement of survey monuments. The Contractor shall not disturb survey monuments, property line and corner survey markers, or benchmarks without the consent of the Engineer or the owner on Private Contracts.
The Contractor shall be responsible for the replacement of any survey benchmark, monument or property line and corner survey marker that is destroyed as a result of their operations.
A survey benchmark is defined as any permanent point used by the National Geodetic Survey (NGS), National Oceanic and Atmospheric Administration (NOAA), California Department of Transportation (Caltrans), Los Angeles County Department of Public Works (LACDPW) Survey Division, City of Carson Public Works Department, or by any other public agency to establish or perpetuate a vertical datum; said point is typically a 3 ¾” aluminum disk with said agency’s stamping. Datum information for public viewing is on file at said agency.
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-9
A survey monument is defined as any permanent point as shown on file at the NGS, NOAA, Caltrans, OCS, City of Carson, Public Works Department (PWD), Engineering Division or any other public agency; said point being used to establish or perpetuate horizontal control. These points include but are not limited to centerline street monuments or accessories to said centerline street monuments (i.e., tie points), property corners or accessories to said corners, or monuments established in connection with the Los Angeles County Geodetic Control Network or accessories to said monuments.
These points shall be tied out and replaced by a licensed Land Surveyor or a licensed Civil Engineer authorized to practice land surveying pursuant to sections 8700 to 8806 of the Business and Professions code of the State of California (Land Surveyors Act). The Corner Records produced from the said tie-out and replacement survey shall be furnished to the City of Carson, Public Works Department (PWD), and Engineering Division as well as filed with the office of the County Surveyor indicating responsible charge (stamped), within 60 days of the final survey.
Payment for Construction Survey and Monumentation shall be at the lump sum basis and shall include all materials, equipment, labor, storage, hauling and disposal, coordination, monument installation, construction staking, survey control and all appurtenant work related to the surveying required for the project as indicated above and as may be required to progress with the work and as may occasionally be required by the Engineer, and no additional compensation shall be due therefore.
BID ITEM NO. 3: TRAFFIC CONTROL
This Bid Item shall include all material, equipment, changeable message signs (CMS) and labor necessary to provide traffic control to fully protect the public from danger due to the work being done. The Contractor shall be responsible for furnishing, placing, and maintaining the traffic control devices and temporary striping as shown on the project traffic control plans. The Contractor shall at his own expense modify or add traffic control devices as deemed necessary by the Engineer.
This Bid Item shall also include the furnishing of a traffic control plan per the CA MUTCD manual AND the Construction Phasing Plan for the City to review for approval 10 days prior to the start of construction.
This Bid Item shall also include any and all reviews, approvals, and permitting by Caltrans for the 110 Freeway on-off ramps on Sepulveda Boulevard between Figueroa Street and the 110 Freeway, and the 110 on-off ramps on Figueroa Street at 220 th Street.
Temporary Striping
The Contractor shall install temporary traffic striping within 24-hours after paving the street or on any un-striped lanes opened to traffic. Public traffic shall not be allowed on any multilane arterial street without temporary or permanent striping.
Temporary striping can be per CSASP Plan No. 1125B-1 and B-2 (without the RPM’s) or by installing reflectorized chip seal markers (single for 4” line, double for 8” line) at 20 feet on PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-10
center when on a taper or curve, and at 40 feet on center elsewhere. If striping is used, stripes can be paint or temporary traffic striping tape.
All temporary striping shall be removed prior to the final striping.
ADVANCE WARNING SIGNS
A. CHANGEABLE MESSAGE SIGNS (CMS)
The Contractor shall provide three (3) solar-powered CMS two weeks prior to commencement of construction. The approved model by the City of Carson is the Wanco Metro VMS Model WVTMM-L. The signs shall be posted in advance of each end of the project area for the duration of the project.
Prior to the start of the construction, display the following message:
Screen 1: STREET NAME CONSTR
Screen 2: BEGINS xx/xx/xx
When construction started, display the following message:
Screen 1: STREET NAME UNDER CONSTR
Screen 2: USE ALT ROUTE
The messages and sign location may be changed at any time as determined by the Engineer.
Contractor is advised that all CMS units will become property of the City of Carson at the completion of the project.
B. STATIC WARNING SIGNS
The Contractor shall post 2 static advance warning signs; at least two weeks (on Arterial or Collector Streets only) prior to commencement of construction start:
MAJOR ROAD CONSTRUCTION ON
______________STREET
FROM <DATE> TO <DATE>
EXPECT DELAYS
USE ALTERNATE ROUTE
The signs shall be posted in advanced of each end of the project. These warning signs shall be sized (5’ height by 6’wide minimum) to fit the above wordings with orange reflective background, black border and 7” black letters. If sign is installed on the sidewalk, there shall be enough clearance for pedestrian access underneath the sign. The Engineer will determine sign placement and the dates.
C. TEMPORARY CONSTRUCTION SIGNS
Contractor shall furnish, install and maintain temporary construction signs per the CA MUTCD Manual. The signs shall be mounted on Type II barricades and secured with sandbags to prevent overturning. The contractor shall install the temporary construction signs during construction at locations approved by the Engineer. The maintenance includes, but is not limited PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-11
to, the relocation for the different construction phases, replacement (if damaged due to the operations of the Contractor) and graffiti removal.
Also included in this Bid Item will be all of the requirements set forth in the Technical Provisions of these Specifications.
Payment for the listed construction signs shall be included in the traffic control lump sum bid item and shall include all labor and materials necessary to manufacture, install and maintain the signs and barricades and no additional compensation will be allowed therefore.
Payment for traffic control shall be on a lump sum basis and shall include full compensation for labor, materials, and equipment necessary (including CMS) to complete this Bid Item and no additional compensation will be allowed therefore.
BID ITEM NO. 4: TRAFFIC SIGNS, STRIPES, MARKINGS, LEGENDS, MARKERS,
AND TOM'S
These items consist of sandblasting or approved equal method and repainting existing pavement stripes, pavement markings, and salvaging and relocating raised pavement markers per Plans.
Construction Striping plans shall be provided at time of Award of Construction Contract which will reflect the adjustment of lane widths to account for bike lane facilities. Adjustment of lane widths shall consist of shifting two traffic lane lines 1’ towards the center line of the road and the addition of bike lane striping, each way.
All work shall be performed in accordance with Sections 84 and 85 of the Caltrans' Standard Specifications, the California Manual on Uniform Traffic Control Devices (MUTCD), and the Caltrans' Standard Plans, except as modified and supplemented below:
1. The use of rapid dry water borne paint material specification no. 8010-91D-30 is not acceptable and shall be replaced by specification no. 8010-21C-30A.
2. Broken lines shall be painted solid within 50 feet of intersections.
3. The solid 4" white lines at the intersection shall have one type G, clear reflective marker installed on the pavement at each end.
4. Paint shall be applied in two coats, 14 days apart, on all pavements except that, on concrete pavements, one coat of black paint shall be applied to the three (3) inch wide stripe between the two four (4) inch wide yellow stripes.
The Contractor shall protect his work until the paint is thoroughly dried. Painted traffic stripes and pavement markings done under this Contract which are damaged or darkened as a result of wheel markings by public traffic and/or construction equipment, shall be repainted as specified by the Engineer at the sole expense of the Contractor.
The same day of construction, before opening the travel way to the public, the Contractor shall either paint traffic stripes and markings or apply reflective Temporary Overlay Markers (TOM).
If the Contractor elects to use TOM's, the Contractor shall paint and complete traffic stripes, markings, and legends within five (5) calendar days after completion of resurfacing operations in that street.
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-12
If TOM's are used, they shall be applied every 24 feet. Four (4) inch wide Type Y amber TOM's shall be applied to delineate centerlines and painted medians. Four (4) inch wide white TOM's shall be applied to delineate lanes and stop bars. TOM's shall not be applied through an intersection.
The application of striping paint must be in the presence of any member from city staff, otherwise it will not be accepted by the city.
Add the following to the provisions of section 6-9, "Liquidated Damages":
Liquidated damages in the amount of $1,000.00 per day shall be assessed for traffic stripes, markings, and legends and/or TOM's not completed within the time specified herein.
Payment for this item at the price bid per lump sum shall be considered as full compensation for doing all work and shall be paid as specified herein and no additional compensation will be allowed therefore.
BID ITEM NO. 5: COLD MILL AC 2”
This Bid Items shall include the uniform cold milling of existing AC at a depth of approx. 2” within the roadway, and approximately 6” to 10” at dig-out areas (See Bid Item Numbers 7 & 8) depending on the actual existing AC depth to reach the existing crushed aggregate subgrade base (CAB) and shall be performed in accordance with Subsection 302-5.2, “Cold Milling Asphalt Concrete” of the Standard Specifications.
Also, asphalt removal by cold milling and hauling away to recycling facilities is included in this bid item and shall include removal of existing materials to grade. The Contractor shall implement whatever measures are practical during removal operations to maintain the existing sub-grade integrity. Any sub-grade disturbed or removed due to the Contractor not using the extra care outlined for his convenience, shall be graded and compacted to a Min. 95% relative compaction, to the required elevations at no cost to the City.
Fabrics or materials such as Petromat or Macadam Material within the project reconstruction areas, if any, shall be removed and disposed as part of the of unit price bid listed under a separate Bid Item No. 26 which is a deletable item.
Payment for these items at the price bid per Square Foot (S.F.) shall be considered as full compensation for performing all work as specified herein and no additional compensation will be allowed therefore.
BID ITEM NO. 6: ASPHALT RUBBER HOT MIX (ARHM) FINISH COURSE This item consists of supplying and placing asphalt concrete pavement in accordance with the provisions of Section 302-9, "Asphalt Rubber Hot Mix (ARHM)" of the Standard Specifications except as modified and supplemented below:
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-13
ARHM construction shall conform to Section 200, 203, 302, and 400 of the Standard Specifications, Section 92 of the Caltrans Standard Specifications and these Special Provisions.
Tack coat is required, and the cost thereof shall be included in the bid price paid per ton for asphalt concrete.
The required AC mix designs shall be as follows:
Surface Course Class C2 1/2” PG 64-10
Base Course Class B 3/4” PG 64-10
Leveling Course Class D2 3/8” PG 64-10
ARHM GG-C Class (1/2”) PG 64-16
Crack Filler Class F PG 64-10
The pavement base course shall be Type B PG 64-10 RAP asphalt concrete shall be laid in lifts with a maximum of 4 inches thick compacted.
Section 302-5.5 entitled "Distribution and Spreading" of the Standard Specifications shall be modified as follows:
Successive courses shall not be laid upon previously laid courses until 24 hours after the previous course was laid.
The Contractor shall construct temporary asphalt concrete ramping with a slope of 1:1 at the edge of open excavation if all of the following occur:
1. Clearance between travel lane and open excavation is less than five (5) feet,
2. Excavation depth is six (6) inches or deeper, and
3. If open excavation will last for more than 48 hours, Payment for the construction and removal of temporary asphalt concrete shall be included in other items of work involved and no additional compensation will be allowed therefore.
The cracks shall be blown clean to expose the depth of the crack as much as possible. Cracks that are ¼-inch and larger shall then be routed with power router equipment. In areas that are severely alligatored, whereby routing would cause further damage to the surrounding pavement, causing chunks or pieces of asphalt to come apart shall not be further routed; in those areas air blowing is sufficient. All cracks that have been routed or air-blown for exposure of a ¼-inch width then are nozzle-filled with an emulsified asphalt and sand. Emulsified asphalt and sand shall conform to Subsection 203-3 and 302-2.4. The sand admixture screening shall be medium time.
A tack coat shall be applied to all surfaces that will be in contact with the asphalt surfacing. The tack coat shall consist of SS-1H emulsified asphalt at an approximate rate of .05 to .10 gallons per square yard shall be uniformly applied upon the existing pavement preceding the placement of the asphalt concrete. It shall be furnished and applied in accordance with the requirements of PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-14
Section 203-3 and 302-5 of the SSPWC. The exact rate of application will be determined by the City Engineer. The tack coat shall be applied only so far in advance of paving or surfacing as ordered by the Engineer.
All petroleum, gas, water and other underground utility covers, valve cans and lids, within the areas to be paved shall be adjusted to grade in accordance with the requirements of their respective owners. Reference the bid item 11 for adjustment to grade of petroleum, gas, water and other underground utility covers, valve cans and lids. The Contractor shall clean the interiors of all debris. It is the Contractor's responsibility to verify the number and location of these structures and to notify the owners thereof prior to doing this work.
The contractor shall have a minimum of three operational rollers including two vibratory rollers on the job site. The vibratory roller shall be used during the breakdown rolling operation. The rollers shall conform to the requirements of the SSPWC. Relative compaction shall be subject to testing by a certified testing laboratory by the City of Carson. The contractor shall be subject to a financial penalty should the compaction requirements fail to be met.
Upon completion, the pavement shall be true to grade and cross section. When a ten-foot (3m) straight-edge is laid on the finished surface parallel to the centerline of the roadway, the surface shall not vary from the edge of the straight-edge more than 1/8 inch (3mm), except at intersections or at changes of grade. Any areas that are not within this tolerance shall be brought to grade immediately following the initial rolling. However, if the paving material has been cooled below the lower limits of the spreading temperatures prescribed in Subsection 302-5.5, "Distribution and Spreading", the surface of the pavement shall be brought to a true grade and cross section by removing the pavement material in the areas to be repaired, by an approved method, to provide a minimum laying depth of one-inch (25mm) of new pavement material at the joint line. Repairs shall not be made to pavement surfaces by feather-edging at joints.
Work determined by the Engineer to conform to the requirements specified herein will be paid for at the contract price per ton for Asphalt Concrete subject to a compensation adjustment based on the relative compaction result from each lot tested in accordance with the following table:
Relative
Compaction
(Percent)
Reduced
Compensation
Factor
Relative
Compaction
(Percent)
Reduced
Compensation
Factor
95.0 1.000 93.4 0.938
94.9 0.998 93.3 0.932
94.8 0.996 93.2 0.925
94.7 0.994 93.1 0.918
94.6 0.991 93.0 0.910
94.5 0.988 92.9 0.902
94.4 0.985 92.8 0.892
94.3 0.982 92.7 0.882
94.2 0.978 92.6 0.871
94.1 0.974 92.5 0.858
94.0 0.970 92.4 0.843
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-15
Relative
Compaction
(Percent)
Reduced
Compensation
Factor
Relative
Compaction
(Percent)
Reduced
Compensation
Factor
93.9 0.966 92.3 0.825
93.8 0.961 92.2 0.804
93.7 0.956 92.1 0.775
93.6 0.950 92.0 0.700
93.5 0.944
Lot sizes are as described in California Test Method 375. Asphalt in a lot that is accepted on the basis of reduced payment will be paid for at the contract price paid for Asphalt Concrete multiplied by the above factors if the lots are within the range of the above table. Should the lot test indicate a relative compaction value of 91.9% or less, the lot shall be removed and replaced at Contractor’s sole expense.
A lot will generally be considered the area of asphalt concrete placement performed in one continuous operation in a given day unless otherwise approved by the Engineer. A lot shall consist of approved paving material from only one asphalt concrete production plant. Should asphalt concrete from more than one source (or plant) be used in any single paving operation, the highest reference maximum density shall be used for determination of Relative Compaction; More than one paving operation (one for each source of material) may be performed if equipped as a separate operation and is approved by the Engineer.
Payment for unclassified excavation required for sawcutting, excavating, removing, hauling, disposing of existing Asphalt Concrete (AC), Portland Cement Concrete (PCC), any other Pavement Surface(s), and base/cement treated base and subgrade materials shall be considered as included in the bid price paid under various bid items and no additional compensation will be allowed therefore.
Existing geotextile fabrics such as Petromat or Macadam Material within the project reconstruction areas shall be removed and disposed as part of the of unit price bid listed under a separate Bid Item No. 26.
Payment for this item at the price bid per unit TON shall be considered full compensation for performing all work as specified herein, including all surface preparation, crack filling and sealing, track coat, paving, and protection of paving, and no additional compensations shall be allowed therefore.
BID ITEM NO. 7 (DIG-OUT SECTIONS): CONSTRUCT ASPHALT HOT MIX (AHM)
BASE COURSE AND CRUSHED AGGREGATE BASE COURSE
AND
BID ITEM NO. 8 (DIG-OUT SECTIONS): CONSTRUCT ASPHALT HOT MIX (AHM)
BASE COURSE
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-16
These items consists of removal of any remaining cracked and/or damaged asphalt after cold milling 2” of AC, and saw cutting and removing at least 6” of existing roadway section (plus an additional 4” where new base is required), furnishing and installing a minimum of 6.0 inches thick compacted Asphalt (AHM) Base Course on top of 4” Crushed Miscellaneous Base (CMB) where applicable.
It shall be the contractor’s responsibility, in conjunction with the city’s representative to identify the final patching limits in the field. All patches must be sawcut prior to removal. Any over- excavation of material will not be paid for and it will be the contractor’s responsibility to remove the required depth of material based on their selected means and methods. Roadway patching operations must be completed within the timeframes described in the specifications in order to minimize the duration that the public will drive on a milled surface.
Payment for these items at the price bid per Square Foot (S.F.), as measured in the field in plan view, and shall be considered as full compensation for doing all work as specified herein and no additional compensation will be allowed therefore.
BID ITEM NO. 9: WEED ABATE AND CRACK SEAL EXISTING SURFACE, AND APPLY TYPE II RAP SLURRY SEAL WITH 3% LATEX
1. GENERAL
Polymer Emulsion – Reclaimed Asphalt Pavement Slurry (RAPS) shall consist of a stable mixture of polymer modified cationic quick-set emulsified asphalt, reclaimed asphalt pavement(RAP), water and set control additives, proportioned, mixed and uniformly spread over a properly prepared surface or pavement where shown on the plans, as specified in this specification, and as directed by the Engineer.
2. MATERIALS
The materials for reclaimed asphalt pavement slurry, immediately prior to mixing shall, conform to the following requirements:
2.01 POLYMER MODIFIED EMULSION (PME)
Emulsified asphalt shall be PMCQS-1h conforming to the requirements shown in the following table. The emulsion shall be homogeneous in color throughout and show no separation after thorough mixing. It shall break and set on the reclaimed aggregate within 5 minutes and shall be ready for vehicular traffic in 60 minutes. The PME shall meet the following requirements:
TESTS ON EMULSION TEST
METHOD
TYPICAL
RESULTS
SPECS.
MIN. MAX
Viscosity 77F, SFS ASTM D244 22 15 90
Sieve test w% ASTM D244 0.01 0.3
Residue from distillation ASTM D244 61.5 57.0
Particle Charge Test ASTM D244 Positive
TESTS ON RESIDUE FROM DISTILLATION
Penetration 77F, dmm ASTM D5 52 40 90 Ductility 77F, dmm ASTM D113 100+ 40
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-17
Solubility in TCE, w% ASTM D2042 99+ 97.5
Torsional Recovery, %, min. CA332 22 18
The polymer used in the manufacture of polymer modified asphaltic emulsions shall be at the option of the Contractor, either neoprene, or a copolymer of butadiene and styrene. Polymer shall be milled or blended into the asphalt or blended into the emulsifier solution prior to the emulsification process. The amount of polymer solids shall be three percent (3%) of the asphalt residual content and shall be certified by the emulsion producer on each load of emulsion delivered to the job site. Samples of polymer may be required and shall conform to the following requirements.
Test Requirement
Total Solids, min % 60
Bound Styrene % 24 - 60
pH at 25 Degrees C 4.2 - 5.2
Brookfield Viscosity RVT 1000 - 4000
Residual Monomer % 0.08 max.
2.02 RAP AGGREGATE
RAP Aggregate shall consist of sound, durable, milled and/or crushed reclaimed asphalt pavement. The material shall be free from vegetable matter, loop wires, paving fabric, crushed concrete, brick and other deleterious substances. When tested in accordance with ASTM C136 and ASTM C117 the percentage composition by weight of the RAP shall conform to the following grading:
Sieve Size Percent Passing1 Percent Passing2
3/8" (9.5 mm) 100 100
No. 4 (4.75mm) 95-100 95-100
No. 8 (2.36 mm) 65-85 70-90
No. 16 (1.18 mm) 35-60 50-75
No. 30 (600 um) 18-38 35-55
No. 50 (330 um) 8-25 22-40
No. 100 (150 um) 5-20 13-38
No. 200 (75 um) 2-12 10-20
Residual Asphalt Content3
6.5.% Min.
(Based on dry weight of
aggregate)
1. On unextracted RAP. 2. On extracted RAP. 3.Determined by Binder Ignition ASTM 6307.
The RAP shall conform to the following quality requirements:
Test Test Method Requirement
Sand Equivalent ASTM D2419 60 Min.
Durability Index 55 Min.
Soundness ASTM C88 15% Max. Using NA2SO4. *
Abrasion Resistance ASTM C131 35% Max. After 500 Revolutions. * * On RAP Source Retained on Number 4 Sieve.
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-18
2.03 WATER
Water shall be potable, free of harmful soluble salts and shall be of such quality that the asphalt will not separate from the emulsion before the slurry seal is in place.
2.04 ADDITIVES
Additives may be used, as approved by the Engineer to accelerate or retard the break-set of the slurry seal or to improve the resulting surface.
3.0 MIX DESIGN
At least 7 working days before slurry seal placement commences, a certified job mix design shall be submitted by the Contractor for approval by the Engineer that conforms to the specification limits, and that is suitable for the traffic, climate conditions, curing conditions and final use. The report shall clearly show the proportions of reclaimed asphalt aggregate, water (min. and max.), additive(s) (usage) and asphalt emulsion based on the dry weight of the reclaimed asphalt aggregate. A laboratory capable of performing the applicable International Slurry Seal Association (ISSA) tests shall perform the tests and mix design. All components used in the mix design shall be representative of the materials proposed by the Contractor to be used on the project. The proposed slurry seal mixture shall conform to the requirements specified when tested in accordance with the following tests:
Test ISSA Test Method Requirement
Wet Track Abrasion Loss g/m2
(g/ft2 ) TB100 650 max.(60)
Slurry Seal Consistency (mm) TB106 30 max.
Loaded Wheel Test TB109 <810 g/m
Wet Stripping TB114 Pass (90% min.)
Mix time TB113
Controllable to 180 seconds min.
at the maximum expected air
temperature at the site during
application.
Wet Cohesion Test (kg-mm) TB139 120 at 30 minutes minimum The component materials shall be within the following limits:
Component Amount
Emulsion 10.0% - 14.0%
Residual Asphalt 12.5% min.
Additives As needed.
Water As needed to achieve proper mix
consistency.
Water, and retarder if used, shall be added to ensure proper workability and permit uncontrolled traffic on the slurry seal within 1 hour after placement without the occurrence of bleeding, raveling, separation or other distress.
4.0 MIXING AND SPREADING EQUIPMENT
Slurry seal shall be mixed in a self-propelled mixing machine equipped with sufficient storage PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-19
capacity for the recycled asphalt aggregate, polymer modified asphalt emulsion, additives and water. The mixing machine shall be equipped with individual volume or weight controls for automatically proportioning and accurately delivering in proper sequence the material to a continuous flow pug mill for mixing. Each material control device shall be calibrated, properly marked, preset and lockable at the direction of the Engineer. Calibrated flow meters shall be provided to measure both the addition of water and asphalt emulsion to the pug mill. Concrete transit mixer trucks shall not be used.
The slurry mixture shall be uniformly spread by means of a controlled spreader box. The spreader shall be capable of spreading a traffic lane width and shall have strips of flexible rubber belting or similar material on each side of the spreader box and in contact with the pavement to prevent loss of slurry from the box. The box shall have baffles, or other suitable devices, to insure uniform application on super-elevated sections and shoulder slopes. The rear flexible strike-off blade shall make close contact with the pavement and shall be capable of being adjusted to the various crown shapes so as to apply a uniform slurry seal. The spreader box shall be maintained in such a manner as to prevent chatter (wash boarding) or other surface defects that will affect the esthetic value of the finished slurry seal mat. The mixing machine shall be equipped with a water pressure system and nozzle type spray bars to provide a water spray immediately ahead of the spreader box.
5.0 PLACING
Slurry seal shall be placed only when the atmospheric temperature is at least 50 oF (10oC) and
rising. The mixture shall not be applied if high relative humidity prolongs the curing beyond a reasonable time. Slurry seal shall not be placed on the surface of a street after 4:00 p.m. of the workday, unless otherwise authorized by the Engineer. The slurry seal shall be placed at an application rate of 12 to 15 pounds per square yard.
Areas, which cannot be reached by the spreader box, shall be surfaced with hand squeegees to provide complete and uniform coverage. The area to be hand worked shall be lightly dampened prior to mix placement. The same type of finish as applied by the spreader box shall be required.
Prior to the slurry sealing operations, the Contractor shall remove all existing thermoplastic striping, legends and raised pavement markers within the slurry seal limits and apply temporary tabs where striping removal has taken place. .
Immediately prior to the slurry sealing operations, the Contractor shall sweep the entire surface with vacuum assisted power brooms or other means necessary to remove all loose particles of paving, all dirt and all other extraneous material.
Before slurry seal operations, all manholes covers, flush inlet covers, monument covers and all other utility covers to remain shall be protected by covering the surface with an appropriate paper or plastic sheeting, cut to fit or by other methods approved by the Engineer. All traces of the cover and slurry seal shall be removed by the end of the same workday. The joint between the edge of the pavement and the concrete gutter shall be sealed by the slurry seal by overlapping the concrete gutter edge and concrete gutter 1 to 2 inches.
PROJECT NO. 1756 TECHNICAL PROVISIONS
-------------------------------------------------------------------------------------------------------------------------------------------- TP-20
The Contractor shall not use sand on the fresh slurry seal for vehicle crossings at intersections and at driveways. The edges of the limits of the slurry seal application on both sides of the street shall be maintained in a neat and uniform line. The Contractor shall refrain from using diesel fuel, gasoline or solvents of any kind for cleaning tools and equipment in such a manner as to permit spillage of the diesel fuel or solvent on new or existing pavement, curbs and gutters, parkways or other improved areas.
The applied RAP slurry seal shall be rolled with a minimum of three passes with a pneumatic roller prior to opening to traffic.
At least 2 days prior to the beginning of slurry seal operations, the Contractor shall notify all affected property owners, residents, businesses and agencies by an approved, written notice detailing streets and limits of work to be done and the hours of work. The Contractor shall, prior to the beginning of slurry seal operations, post all streets that are to be worked upon with approved “No Parking – Tow Away” signs at 100 feet intervals. These shall also state the day of the week and hours of no parking.
Hand tools shall be available in order to remove spillage. Ridges or bumps in the finished surface will not be permitted. The mixture shall be uniform and homogeneous after spreading on the existing surface and shall not show separation of the emulsion and aggregate after setting.
Adequate means shall be provided to protect the slurry seal from damage from traffic until such time that the mixture has cured sufficiently so that the slurry seal will not adhere to and be picked up by the tires of the vehicles. Basis for rejection of improperly placing slurry seal includes, but is not limited to, striation of surface, “balling” of material due to quick-set and tracks of unauthorized vehicles, bicycles and pedestrians.
5.0 MEASUREMENT and PAYMENT
Slurry seal will be measured and paid for by the ton (TON). The quantity of slurry seal to be paid for will be the combined mass of the Reclaimed Asphalt Pavement and Polymer Modified Asphalt Emulsion. The mass of the water and additives used in the mixture will not be included in the mass of the slurry seal to be paid for. The contract price paid per ton for slurry seal shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the work involved in the furnishing and placing of the slurry seal complete in place, including cleaning the surface and protecting the slurry seal until it has set, all as shown on the plans, as specified in these specifications and as directed by the Engineer.
BID ITEM NO. 10: REMOVE AND CONSTRUCT ACCESS CURB RAMPS:
This work consists of furnishing all necessary labor, materials, and equipment to remove and dispose of all existing interfering pavement, cross gutter spandrels and curb and gutter, sidewalk and construct new Portland Cement Concrete (PCC) curb ramp over 4” of Class 2 Aggregate Base and as indicated on the plans.