o Status as of April 21, 2025: Project was advertised to contractors on March 18, 2025, with bids due May 22, 2025. The supplemental funding agreement for construction funds was approved by City Council at the April 1, 2025, meeting. o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o Status as of July 24, 2025: No update
o Status as of August 20, 2025: Contract award anticipated to be requested at the September 16, 2025, City Council Meeting.
o Status as of September 18, 2025: No update
o Status as of October 23, 2025: Contract award was approved at City Council on September 30, 2025. Staff are working to execute the contract and issue the purchase order. o Status as of November 20, 2025: Contract has been executed. Staff waiting for Purchase Order before Notice to Proceed is issued.

• PW 1657: FOR MR 312.46 AND MR 312.41, TRAFFIC SIGNAL UPGRADES o Location: Figueroa St at Victoria St; Main St at 220th St; Main St at Victoria St. o Main St at Albertoni St; and Figueroa St at 223rd St; and Figueroa Street at 234th St. o Description: Traffic Signal Upgrade at six (6) intersections. The proposed upgrades aim to improve signal coordination and traffic progression to alleviate arterial congestion by installing, replacing and/or updating traffic signal poles, mast arms, signal heads, controllers, cabinets, left turn phasing, CCTVs, countdown pedestrian signal heads, ADA compliant curb ramps and pedestrian push buttons, and traffic signal timing. o Budget: $4,220,000 (Measure R Grant)
o Status: DESIGN AND PERMITTING
 Revised funding agreement approved on May 16, 2023, City Council  Awaiting final SCE plans
 Status as of November 20, 2023: No update
 Status as of December 29, 2023: No update
 Status as of January 17, 2024: No update
 Status as of February 7, 2024: Received final SCE plans, working with designer to revise PS&E package, Los Angeles City DOT to review location within their right-of-way.
 Status as of March 13, 2024: Received final PS&E package for Los Angeles City DOT location, to sign internally and submitted to LADOT for signature.

Designer making final revisions to PS&E package.
 Status as of April 18, 2024: LADOT provided approval, but LABOE has not reviewed. Met with LABOE to clarify their approval process for “A Permit”.  Status as of May 15, 2024: LABOE to review plans.
 Status as of June 20, 2024: LABOE review continuing.
 Status as of July 25, 2024: No update
 Status as of August 26, 2024: LABOE reviewed with no further comments.

LABOE issuing permits and final signing of plans.
 Status as of September 18, 2024: Staff preparing bid package, awaiting filing of Notice of Exemption.
 Status as of October 28, 2024: Waiting for final updates from consultant. IFB planned for November pending budget.

Public Works Department November 2025 Monthly Report

Page 18 ends

 Status as of December 19, 2024: IFB was issued December 9, 2024. A pre-bid conference is being held December 19, 2024. Bids are due January 9, 2025.  Status as of January 16, 2025: Staff is responding to bidders’ questions, bids due February 3, 2025.
 Status as of February 20, 2025 : Bids were received February 3, 2025. Staff is reviewing the bids.
 Status as of March 20, 2025: No update
 Status as of April 21, 2025: Supplemental agreement to extend grant deadline on City Council agenda for April 15, 2025. Notice of Intent to Award issued April 8, 2025. Project award on agenda for May 6, 2025, City Council meeting.  Status as of May 22, 2025: Agenda item for award of construction pushed back to June 3, 2025, City Council meeting.
 Status as of June 18, 2025: No update
 Status as of July 24, 2025: Staff to recommend award contract to Belco Electric at City Council Meeting on August 5, 2025.
 Status as of August 20, 2025: Contract awarded to Belco Electric at City Council on August 5, 2025.
 Status as of September 18, 2025: No update
 Status as of October 23, 2025: Contract has been executed, staff working to issue purchase order before giving the Notice to Proceed to the contractor.  Status as of November 20, 2025: Purchase Order has been generated. Staff are working to coordinate kick -off meeting for the first week of December.

Notice to Proceed to be issued before the end of November.

• PW 1667: TRAFFIC SIGNAL IMPROVEMENT AT AVALON BLVD. & GARDENA BLVD. o Location: Intersection of Avalon Blvd and Gardena Blvd o Description: Traffic signal upgrade design to include protected left-turn phasing for north- south traffic.
o Budget: $500,000
o Status: DESIGN
 Status as of October 26, 2023: Design Consultant to submit 100% PS&E packet.

Status as of November 20, 2023: Designer is obtaining potholing. The designer will submit plans in early December. County is reviewing City’s request to incorporate our design into County’s Avalon TSSP project design.
 Status as of January 17, 2024: Design complete. The city has accepted the package.

Sent to County, who will be preparing a revised signal design.  Status as of February 7, 2024: County preparing update to design to insert into upcoming City procurement.
o Status as of March 13, 2024: No update
o Status as of April 18, 2024: No update
o Status as of May 20, 2024: No update
o Status as of June 20, 2024: Received County’s revised signal design; comments returned to County for final incorporation.
o Status as of July 25, 2024: No update
o Status of August 26, 2024: Received final plans from County. Reviewing and compiling the bid package.
o Status as of September 18, 2024: Staff preparing bid package, awaiting filing of Notice of Exemption
Public Works Department November 2025 Monthly Report

Page 19 ends

o Status as of October 28, 2024: Notice of exemption filed, IFB anticipated in November pending budget.
o Status as of December 19, 2024: IFB was issued November 7, 2024. The bidding closed on December 12, 2024. Staff are reviewing and evaluating the bids. o Status as of January 16, 2025: Staff are reviewing bids. o Status as of February 20, 2025: Staff are reviewing reference for the low bidder. o Status as of March 20, 2025: Staff report prepared to award construction contract, anticipated for April 15, 2025, City Council meeting.
o Status as of April 21, 2025: Award of construction contract anticipated for May 6, 2025, City Council Meeting.
o Status as of May 22, 2025: Staff is working with the contractor to execute the contract. o Status as of June 18, 2025: No update
o Status as of July 24, 2025: Contract executed July 23, 2025. o Status as of August 20, 2025: A Notice to Proceed will be issued to the contractor when the Purchase Order is created.
o Status as of September 18, 2025: No update
o Status as of October 23, 2025: Contractor to submit excavation permit and begin potholing next month
o Status as of November 20, 2025: Contractor issued excavation permit application.

Staff provided feedback and contractor revised. Staff reviewing revised application, potholing expected to occur early December.

• PW1784: CENTRAL AVE. AT UNIVERSITY DR. TRAFFIC SIGNAL IMPROVEMENT o Location: Intersection of Central Avenue and University Drive. o Description: Installation of left turn arrows at existing signalized intersection o Budget: $640,000
o Status: DESIGN
 Consultant preparing 60% plans.
 Status of August 26, 2024: Consultant submitted 60% plans and City reviewing.

Working through design issues with placement of new signal poles.  Status as of September 18, 2024: City provided 60% comments. Consultant revising plans, 90% anticipated in November.
 Status as of December 19, 2024: Consultant presented change order due to additional potholing and redesign of southwest quadrant. Staff are reviewing.  Status as of January 16, 2025: No update
 Status as of February 20, 2025: No update
 Status as of March 20, 2025: Change order was approved and Notice to Proceed on additional scope was issued March 5, 2025.
 Status as of April 21, 2025: Revised 90% design submitted and plans are in plan check.
 Status as of May 22, 2025: No update
 Status as of June 18, 2025: No update
 Status as of July 24, 2025: 100% plans were received on July 14, 2025  Status as of August 20, 2025: Staff reviewed and submitted feedback on 100% PS&E.
 Status as of September 18, 2025: No update
 Status as of October 23, 2025: On October 21, City Council approved the PS&E for the project, authorized staff to advertise for construction, and authorized staff to record the “Notice of Exemption”.

Public Works Department November 2025 Monthly Report

Page 20 ends

 Status as of November 20, 2025: Staff working to advertise the project for construction bids, expected in early December.

Summary of All Traffic Signal Projects:

Location/Intersection Construction Start Date Anticipated Construction Completion Date PW 1612 – Broadway at Griffith St In Design TBD
PW 1667-Avalon Blvd at Gardena Blvd November 2025 TBD
PW 1649-Avalon Blvd at Victoria Ave January 2026 TBD
PW 1784- Central Ave at University Dr March 2025 TBD
PW 1647-Del Amo Blvd at Figueroa St In Design TBD
PW 1647 Del Amo Blvd at Hamilton Ave In-Design TBD
PW 1736 Dolores St. at 223rd St. (CIP 24-25 Design)
PW 1647 Hamilton Ave at I-110 SB
On/Off-ramps
In Design TBD
PW 1657-Main St at 220th St December 2025 TBD
PW 1649 -Main St at 223rd St January 2026 TBD
PW 1657-Main St at Albertoni St December 2025 TBD
PW 1649-Main St at Sepulveda Blvd January 2026 TBD
PW1657-Main St at Victoria St December 2025 TBD
PW 1647-Main St. at I 405 NB On-ramp In Design TBD
PW 1647-Main St. at I 405 NB Off-ramp In Design TBD
PW 1657-Figueroa St at 223rd St December 2025 TBD
PW 1657-Figueroa St at 234th St December 2025 TBD
PW 1647-Figueroa St at I-110 NB on/off
ramps
In Design TBD
PW 1649-Figueroa St at Torrance Blvd January 2026 TBD
PW 1657-Figueroa St at Victoria St December 2025 TBD
* Delays due to long-lead items and supply chain issues

Stormwater Improvements

• PW 1682: STORMWATER FACILITIES & IMPLEMENTATION PLAN
 Location: Citywide
 Description: Developing a plan to identify potential new stormwater facilities that are needed for compliance with the City’s National Pollutant Discharge Elimination Systems (NPDES) permit. Ensures that we have clean water in our local waterbodies and helps with climate resiliency through water capture and pre-treatment and reduces our impact on the oceans.

To also update the Enhanced Watershed Management Plan, which is a document that is used to maintain compliance with the City’s NPDES permit. This is needed to keep up to date with permits from the State.
 Current Phase: PLAN DEVELOPMENT AND SITE SELECTION
 The first project identified is the Stevenson Park Stormwater Capture Facility. The team has already reached out to Los Angeles County Sanitation to perform a sewer area study and is working on getting funding. The team must also gain approval from the Flood Control District before moving forward with an application Public Works Department November 2025 Monthly Report

Page 21 ends

next fiscal year. We have been informed that applications for future funding may be paused for this year.
 The consultant has identified BMPs for the Gardena, Main and Avalon Green Street Improvement task that were added to the amended contract in June. 60% of the design has been completed and the project is pending a geotechnical review. We are negotiating and looking for potential funding to provide survey and geotechnical work. Design is paused until this can be executed.  Status as of January 22, 2024: The team is conducting outreach to the Mayor in February to help promote understanding and to gain feedback on potential stormwater facilities and compliance with the MS4 permit. They will also reach out to several other officials.
 Status as of February 21, 2024: The team is conducting outreach to stakeholders throughout the city to inform them of the Plan. They are also revising several aspects of the scoring to provide a better assessment of possible stormwater facilities.
 Status as of March 20, 2024: The consultant is preparing for outreach to City Council members and other stakeholders, outreach materials and content will be reviewed when submitted. The consultant is also planning on completing the Facilities Plan by the end of May.
 Status as of April 23, 2024: The consultant is working on finalizing a prioritization of all stormwater BMPs in the coming months.
 Status as of May 20, 2024: No update
 Status as of June 20, 2024: The consultant expects to submit a completed draft master plan by the end of the month.
 Status as of July 25, 2024: No update
 Status as of August 26, 2024: The plan has been completed, a workshop will be planned to present the potential projects to City staff and inform feedback on moving forward with any projects.
 Status as of October 30, 2024: Workshop has been completed, and two projects will be selected for grant funding opportunities  Status as of December 19, 2024: Consultant has begun work on Green Streets design and technical resource applications.
 Status as of January 16, 2025: Selecting two projects to submit for grant funding.
 Status as of February 20, 2025: Two projects selected – pursuing dry wells and have contacted LA County Parks for a project at Victoria Park.  Status as of March 20, 2025: Began work with application for dry wells project.  Status as of April 21, 2025: Consultant has begun working on applications for the two projects and a submittal is expected by July 2025.
 Status as of May 22, 2025: Draft applications received from consultant are being reviewed by staff.
 Status as of June 18, 2025: No update
 Status as of July 24, 2025: Two conceptual projects are being submitted for Measure W grant funding by the end of the month.
 Status as of August 20, 2025: All primary tasks completed. The final master plan will be submitted to Council for acceptance.
 Status as of September 18, 2025: No update
Public Works Department November 2025 Monthly Report

Page 22 ends

 Status as of October 23, 2025: No update
 Status as of November 20, 2025: Presented project to Safe Clean Water Program for potential funding on November 19, 2025.

• PW1776 CALAS PARK STORMWATER SUPPLEMENTAL ENVIRONMENTAL PROJECT  Location: Calas Park
 Description: Joint project with Los Angeles County Sanitation Districts to construct a stormwater treatment and capture facility. This project will divert water from the storm drain and allow it to be cleaned and/or reused in the park while also improving park facilities.
 Current Phase: Request for Proposals to perform design services.  Status as of March 20, 2024: The RFP is out for bid and bids should be received by next month, with a selection in May.
 Status as of April 23, 2024: We are on schedule with the RFP . A pre -proposal meeting was conducted with 30 attendees. The bid opening will be in early May with interviews the following week if needed.
 Status as of May 20, 2024: No update.
 Status as of June 20, 2024: The project is set to be awarded in July and will go on the City Council’s agenda. The company selected is Craftwater Engineering.
 Status as of July 25, 2024: No update
 Status as of August 26, 2024: Craftwater Engineering has begun pre-design for the project and the contract is in the process of being executed.  Status as of October 30, 2024: Preliminary design has been completed and the project is ready for 30% design to begin, scheduled to be completed in December.
 Status as of December 19, 2024: 30% Design submitted for review in January.  Status as of January 16, 2025: Comments being submitted in one week. The design workshop was completed on January 16, 2025.
 Status as of February 20, 2025: Project has begun CEQA process and consultant is working on the 60% design.
 Status as of March 20, 2025: 60% Design scheduled for delivery and review.  Status as of April 21, 2025: Comments returned to the consultant. Work continues to progress towards 90% design.
 Status as of May 22, 2025: Consultant has submitted the 90% design. This will be reviewed in June 2025.
 Status as of June 18, 2025: No update
 Status as of July 24, 2025: 90% PS&E completed. CEQA was determined to be a Mitigated Negative Declaration and working towards submittal.  Status as of August 20, 2025: 100% PS&E submitted by the consultant. Work will begin on preparing for permits before putting the project out for construction.  Status as of September 18, 2025: No update
 Status as of October 23, 2025: CEQA completed and posted. Permit applications put out for review by Los Angeles County.
 Status as of November 20, 2025: No update

• PW1676 STORMWATER GREEN STREET ENGINEERING, DESIGN &

IMPLEMTATION
Public Works Department November 2025 Monthly Report

Page 23 ends

 Location: Gardena and Main Street
 Description: Stormwater treatment project to construct tree wells and a dry well on Gardena and Main Street, which will filter and clean water from the streets.  Current Phase: In Design
 Status as of January 16, 2025: Consultant is performing geotechnical and survey work to establish design parameters.
 Status as of February 20, 2025: Geotechnical work has been completed and 60% design is underway.
 Status as of March 20, 2025: Completing survey and 60% design expected.  Status as of April 21, 2025: No update
 Status as of May 22, 2025: No update
 Status as of June 18, 2025: No update
 Status as of July 24, 2025: Met with SCE to resolve potential conflicts. 90% design being completed.
 Status as of August 20, 2025: No update
 Status as of September 18, 2025: No update
 Status as of October 23, 2025: Expecting 100% design in the next month.  Status as of November 20, 2025: Design has been delayed; expected completion within the next one to two months.

Bike Lane Projects

• PW 1451 & 1452: BIKE LANE INSTALLATION
 Location: Figueroa Street, Main Street, Victoria Street, and Carson Street. University Drive, Avalon Boulevard, Central Avenue, Del Amo Boulevard, and 223rd Street.  Description: Design and construction of bike lane facilities  Budget: PW1451 = $4,900,000.00; PW1452 = $4,900,000.00  Current Phase: DESIGN AND PERMITTING
 Final design plan review to be completed in January 2024  Status as of October 26, 2023: Metro Measure M funding awarded and programmed for construction phase.
 Status as of November 20, 2023: Working with Metro on funding agreement for Measure M funds.
 Status as of December 29, 2023: Working with Caltrans Local Assistance to confirm the revised funding plan including Metro funds and City match.  Status as of January 17, 2024: Resubmitted with additional Caltrans requirements.  Status as of February 7, 2024: City performing design review to coordinate with other CIP projects.
 Status as of March 13, 2024: No update
 Status as of April 18, 2024: Consultant updating final plans package to incorporate other City projects, updates to Federal MUTCD.
 Status as of May 15, 2024: LACMTA funding agreements scheduled for the May 22, 2024, City Council Agenda. Working with Caltrans to submit necessary forms to authorize construction funding.
 Status as of June 20, 2024: Working with Caltrans on necessary forms to authorize construction funding and FHWA review/approval of Carson’s PLA.  Status as of July 25, 2024: Meeting tentatively scheduled with Caltrans to discuss delivery options.
 Status of August 26, 2024: Received tentative direction from Caltrans on City’s project delivery and packaging plan. Confirmed that Metro also accepts this approach.

Public Works Department November 2025 Monthly Report

Page 24 ends

Caltrans is agreeable to convert some Federal-Aid funds to State funds which will reduce the paperwork burden on CIP projects that use the new striping design. Project will be bid in 3 parts: 1) Median modifications and lighting relocation, 2) Federal-Aid signing and striping for projects not already in CIP (also not subject to PLA), and 3) individual signing and striping sheets for CIP projects to be implemented over this fiscal year and the next two (2) fiscal years prior to 2028 Olympics. The city is waiting for final confirmation from Caltrans on this plan.
 Status as of September 18, 2024: City awaiting final plans for each of 3 packages.

Anticipated City Council approval date 10/15/24.
 Status as of October 28, 2024: Anticipated City Council approval date 11/19/24.  Status as of December 19, 2024: RFA for construction of Federal project was submitted on December 11, 2024.
 Status as of January 16, 2025: City received letter from CPUC regarding their opinion that a GO 88-B permit is required for striping a bike lane near railroad crossings. Staff reviewing options and potential response. Caltrans returned RFA-CON as incomplete – Staff forwarded rejection to consultant for rework. The consultant presented supplemental scope and fee for reworking RFA-CON, which the city has rejected as this rework is considered within scope.
 Status as of February 20, 2025: No update
 Status as of March 20, 2025: Submitted revised RFA-CON package. Received additional comments from Caltrans.
 Status as of April 21, 2025: Caltrans returned RFA-CON package for additional corrections.

Staff preparing resubmittal. LA County provided comments on street lighting design.

Consultant updating plans.
 Status as of May 22, 2025: Staff resubmitted RFA-CON package with corrections on May 8, 2025.
 Status as of June 18, 2025: No update
 Status as of July 24, 2025: No update
 Status as of August 20, 2025: No update
 Status as of September 18, 2025: No update
 Status as of October 23, 2025: No update
 Status as of November 20, 2025: Staff waiting for SCE plans for lighting.

• PW1490 & 1600: DOMINGUEZ CHANNEL BIKE PATH INSTALLATION PHASES I & II  Location – Phase I: Main Street to Avalon Boulevard
 Location – Phase II: Avalon Boulevard to Carson St.
 Description: Installation of Bike path along Dominguez Channel  Budget: $9,000,000.00 (PW1490); $5,500,000.00 (PW1600)  Current Phase: DESIGN AND PERMITTING
 As a result of the redesign to address safety concerns, the City is working with Metro requesting additional funding and a time extension.
 Status as of October 26, 2023: Consultant to continue design with modified scope.  Status as of November 20, 2023: Consultant to continue design with modified scope.  Status as of December 29, 2023: Consultant contract amendment approved, awaiting signed amendment in mail to issue task order.
 Status as of January 17, 2024: Awaiting signed task order memo to issue task order Notice to Proceed.
 S tatus as of February 7, 2024: Notice to proceed on Task Order was issued, working with LA County DPW to obtain permit to conduct survey work for design.

Public Works Department November 2025 Monthly Report

Page 25 ends

 Status as of March 13, 2024: LA County DPW permit obtained, survey work to begin this month.
 Status as of April 18, 2024: Seeking a meeting with LA County to review geotechnical scope, waiting for communication from LA County as to who is reviewing.
 Status of May 15, 2024: Met with LA County to review structural and geotechnical questions, working with LA County Flood District through permit requirements for various subcontractors’ scope of work.
 Status as of June 20, 2024: Biological survey to be conducted this month.  Status as of July 25, 2024: Biological survey is complete. The consultant is working on civil plans. Consultant submitted permit for geotechnical borings which is pending LA County review and approval. Conducted coordination meeting with County on Greenway project status, City’s needs from County.  Status of August 26, 2024: Conducted meeting with County to discuss Geotechnical exploratory permit pending LA County review. The county should have comments on permit in September.
 Status as of September 18, 2024: Continued coordination with County on Greenway parklet plans, permit still pending LA County review and approval.  Status as of October 28, 2024: Geotech field work complete, awaiting soils report for structural and civil design. Continued coordination with County on Greenway parklet plans
 Status as of December 19, 2024: Staff reviewing soils report. Consultant has begun structural design.
 Status as of January 16, 2025: Structural and civil designs are ongoing.

Coordination with LA County is ongoing for review of structural elements and for coordination within the parklet area.
 Status as of February 20, 2025: Structural and civil designs are ongoing. Staff and Consultant met with LA County team January 28, 2025, to discuss structural design approach. The consultant is collaborating with LA County designer on the parklet area.
 Status as of March 20, 2025: Staff and consultant to meet again with LA County on March 20, 2025 (today) to discuss approach for design and whether a design-build approach could be reviewable for LA County.
 Status as of April 21, 2025: City soliciting an on-call environmental consultant for review of Initial Study and permitting work. Designer working on structural plans for underpasses and coordinating with LA County on Del Amo parklet area.  Status as of May 22, 2025: Staff working with Community Development to issue Task Order for an on-call environmental consultant.
 Status as of June 18, 2025: No update
 Status as of July 24, 2025: No update
 Status as of August 20, 2025: Contract amendment for the consultant anticipated to go to City Council on September 2,2025. This will allow the consultant to continue with structural design of underpass and bridge structures.  Status as of September 18, 2025: No update
 Status as of October 23, 2025: Contract amendment was approved at City Council on September 2, 2025. The Notice to Proceed was issued to the consultant on September 25, 2025.
 Status as of November 20, 2025: No update

Public Works Department November 2025 Monthly Report

Page 26 ends

• PW1534: ACTIVE TRANSPORTATION PROGRAM – SANTA FE BIKE LANE  Location: Santa Fe Ave and City-wide
 Description: Construct bike lane on Santa Fe Ave; install curb ramps city-wide; install speed feedback signs city-wide; install crosswalks city-wide; install pedestrian push buttons and countdown heads city-wide
 Budget: $3,491,000
 Status: DESIGN
 Status as of December 29, 2023: Working with Caltrans to program allocation request.
 Status as of January 17, 2024: Resubmitted with additional Caltrans requirements.  Status as of February 7, 2024: No update
 Status as of March 13, 2024: On CTC March Agenda for allocation.  Status as of April 18, 2024: CTC allocated funds for plan update. Program supplement agreement scheduled for May 21, 2024, City Council Meeting Agenda.  Status as of May 20, 2024: No update.
 Status as of June 20, 2024: Received approved finance letter from Caltrans for PA&ED phase. City reviewing procurement options for this project to complete design.
 Status as of July 25, 2024: No update
 Status as of September 18, 2024: Design to be advertised to include curb ramp design, median nose cuts, and other Community-Wide Safety Improvements that were approved in this grant. Project will then be bid as one construction package, which will include already completed Santa Fe Bike Lane design.  Status as of October 28, 2024: No update.
 Status as of December 19, 2024: No update
 Status as of January 16, 2025: No update
 Status as of February 20, 2025: No update
 Status as of March 20, 2025: Drafting RFP
 Status as of April 21, 2025: No update
 Status as of May 22, 2025: No update
 Status as of June 18, 2025: No update
 Status as of July 24, 2025: No update
 Status as of August 20, 2025: No update
 Status as of September 18, 2025: No update
 Status as of October 23, 2025: No update
 Status as of November 20, 2025: No update

Park Improvements

• PW 1368: CARRIAGE CREST PARK REDEVELOPMENT
o Location: Carriage Crest Park
o Description: Improve site condition of existing park and develop newly acquired 10-acre parcel for new athletic ballfields (baseball & soccer) with a new dog park, installation of all- abilities playground, renovation to the existing building, construction of new picnic shelters, concession stand, restroom, and walking path. o Status: DESIGN
Public Works Department November 2025 Monthly Report

Page 27 ends

 Kick off meeting with the designer was conducted in early May to establish a project schedule and verify City’s goals & objectives that shall be included in the design.
 Funds were appropriated by City Council at the June 6, 2023, meeting for the discrepancy of the design cost due to the incorrect amount at the award of design on February 21, 2023, City Council meeting.
 Designer (RJM) completed the land survey of the site.  It was discovered by Leighton Associates that further soil testing is needed, which is beyond the current scope of work. The extended scope will require a council agenda item to increase costs and amend the scope of work.  Staff are still waiting for the fully executed contract to be provided to RJM. The consultant is working in good faith so that the City will issue a purchase order along with the fully executed contract.
 RJM is preparing preliminary concept plans to be reviewed by Community Services for a presentation to Council.
 Status as of October 26, 2023: In progress; concept to be presented to Council by P&R.
 Status as of November 27, 2023: Designer advised to move forward with the concept design to construction documents design phase. Review of first plan submittals is estimated for December.
 Status as of January 22, 2024: Staff (Maintenance Superintendents & Supervisors) reviewed and discussed comments on the 50% design submittal of the improvement plans. Comments were shared and discussed with designers for them to address and include in next submittal (90% Submittal)  Status as of January 22, 2024: Designer discovered a 69” RCP Storm drain system within a 13-ft easement, owned/maintained by LA County Department of Public Works. City must apply to LACDPW which may allow the City to build on/over said drainage system. If not allowed, the approved layout will need to be reconfigured due to the anticipated restrictions by LACDPW.  Status as of March 20, 2024: RJM submitted 90% of construction plans. Staff reviewing designs in detail.
• City staff is waiting for LA County’s directions about the 69” RCP under a 13-ft easement that has proposed improvements on it.
• City staff are waiting for KOA to provide updated traffic study. • City staff are waiting for a report from Leighton Consulting to identify soil removal due to contamination.
 Status as of April 29, 2024:
• The County provided comments for improvements within the easement.

They have requested exhibits with details.
• Traffic Study is complete and warrants a new signal for ingress & egress at the new parking lot towards the southeasterly section of the park. • Leighton has unofficially informed us that there is minimal soil that is considered contaminated. They are verifying the lab results to determine if removal is necessary based on the low detection results. • Staff provided comments on 90% to the designer.

Public Works Department November 2025 Monthly Report

Page 28 ends

 Status as of May 23, 2024:
• Submitted Exhibits per County’s requirements. County added items to submit (beyond previous requirements). Designer preparing additional exhibits and scheduled to submit to County by end of May (delayed 3 weeks).
• Completion of design is contingent on County’s approval of proposed work over LA County’s Storm Drain easement. LA County’s review is a minimum of five (5) weeks from the latest submittal. Estimated response from County is early July.
• The newly estimated design completion is early August.  Status as of June 24, 2024
• Received comments back from LA County regarding encroachment to easement. Designer to address the last set of comments and expect approval from LA County by early July.
• Additional soil boring is required in the area where the park marquee sign will be placed. Consultant requesting additional compensation since this is beyond the scope of work.
• Staff recently received PO for C-Below for exploration of existing petroleum utilities towards the easterly side of the property. Staff is coordinating work with the contractor to be completed by early July. Data will be shared with the consultant to verify any conflicts with proposed improvements. • Staff is working with the designer to complete plans by the third week of July for bid advertising.
 Status as of July 25, 2024
• CEQA approved and project PS&E are ready to be advertised. • Invitation for Formal Bids is posted to solicit bids on July 25, 2024.  Status as of August 26, 2024
• A pre-bid meeting was conducted to clearly inform interested bidders of the accelerated schedule and high expectations for the project. • Several questions were submitted by interested bidders which resulted in a couple addendums. All responses and addendums were provided to the contractor at the appropriate time.
• Bid opening is scheduled for September 4, 2024.
 Status as of September 23, 2024
• Bids opened and construction project is recommended to be awarded on the 10/1/24 City Council Mtg.
• If awarded construction is estimated to start early November to have approximately 9 months of construction
 Status as of October 30, 2024
• Construction Contract was awarded to Urban Habitat for $23M. Staff immediately circulated the contract for execution.
• A preconstruction meeting is tentatively set for November 6 th in anticipation
of issuance of the Purchase Order by end of October.

Public Works Department November 2025 Monthly Report

Page 29 ends

• Staff working closely with designers and building and safety for issuance of grading permits. A SWPPP to be provided by the contractor prior to issuance of the Grading Permit. The SWPPP is also required to obtain a WDID from the State website, also as part of the grading permit requirements.
• Staff is soliciting service from an Environmental Engineering firm to locate an abandoned oilwell. The scope will also involve a leak test and mitigation plans, if necessary.
 Status as of December 19, 2024
• The city secured services from an environmental engineering firm to research the existing oil well and exploration of the well is underway. • Contracts were circulated and approved and a requisition for a purchase order was submitted.
• The Building Official was adamant that the designer fill and/or sign “Forms A and B”. However, the designers disagreed was it was their responsibility to execute. There were several meetings and discussions over several weeks with all parties involved (contractor, construction managers, designers, and the Building Official). Eventually the Building Official was presented with an alternate form that satisfied the requirement. Getting this item cleared is one of the items needed for Building and Safety to issue Grading Permits. Other required items have been presented to Building and Safety for their review and approval.
• The city’s labor compliance firm is initiating and coordinating various labor union requirements with the project contractor.
 Status as of January 16, 2025
• Pre-con meetings started
• Demo permit received
• Contractors mobilized and installed their storage containers • Fencing at site perimeter was installed
• De-grubbing commenced
• R emoval of existing park equipment started
• Site investigation of nursery began
• Methane Investigations are underway
 Status as of February 20, 2025: No update
 Status as of March 20, 2025: Public Safety and Public Works were notified of graffiti on the wall of one of the buildings at Carriage Crest Park (CCP). The contractor will continue grading in the expansion area while the asphalt and concrete issues in that area are resolved. We are also working with the PRC prefab building vendor to incorporate the methane mitigation retrofit measure and obtain approval from Building and Safety. The switchgear lead time is approximately 12 months, and we are working with the contractor to identify alternative solutions to energize the park before project completion.
 Status as of April 21, 2025: Nursery/expansion work started last week and will continue through the end of April. Musco footings, monument sign, and retaining wall work are ongoing. Electrical trench and conduit installation began on April 14, 2025, and is in progress.

Public Works Department November 2025 Monthly Report

Page 30 ends

 Status as of May 22, 2025: Ongoing construction: over-excavation is in progress.

We are encountering numerous pipelines and underground materials and facilities that were not shown in the as-builts.
 Status as of June 18, 2025: No update
 Status as of July 24, 2025: All materials in the nursery area, including asphalt, concrete , CMU walls, and trellis systems, have been removed. A transient pipe was found and removed. The abatement trenches have been backfilled. Over-excavation and grading are ongoing, including over -excavation for the walkway around the existing park building and along the north property line for the CMU retaining wall.  Status as of August 20, 2025: The southeast parking lot has been compacted.

Ongoing grading work continues, along with irrigation and sewer line installation. On the north side/volleyball area, over -excavation and compaction are complete. The walkway has been backfilled and compacted. Haul -off of over -excavated material has begun.
 Status as of September 18, 2025: South perimeter fencing has been removed, and the north side fence posts are substantially complete. Dirt export continues, and grading at the Figueroa lot is in progress. Utility work is ongoing in the northwest section and Figueroa lot. The scoreboard footings are ready for concrete, storm drain installation is in progress, and forms with rebar are in place at the north retaining wall. The monument sign potholes have also been backfilled with slurry.  Status as of October 23, 2025: Installation of the first CMU retaining wall on the north side of the property is complete, and waterproofing and visqueen have been installed on it. The fence posts for the northeast soccer fields have been set, and their concrete has been poured. Concrete curbs for the playground and parking lot are in place, and the curb formwork for the Sepulveda parking lot is also complete.

The rebar has been set , and concrete has been poured for the monument sign footing. Grading adjustment for the cheek wall at the northeast corner is complete.  Status as of November 20, 2025: Work at Carriage Crest Park continues to progress across multiple areas of the site. The scoreboard posts have been installed, and the monument sign caisson footings have been poured. Grading for the Moneta Avenue pathway and ramp was completed, and a French drain was installed behind the CMU retaining wall. Formwork and rebar were put in place for the upcoming concrete pour for the basketball and pickleball courts, while grading for the Moneta connection ramp was completed. Storm drain trenching and installation also continued around the ball fields and dog park areas. Grading around the existing recreation building was completed, with concrete forms set and ready for inspection and placement. An abandoned

2.5-inch pipe along the east fence line was exposed, capped, and demolished.

Storm drain connections between the parking lot and soccer fields were completed, and the concrete pad for the basketball courts has now been poured.

• PW1515: CARRIAGE CREST PARK STORMWATER CAPTURE
o Location: Northeast corner of Sepulveda and Figueroa St. o Description: Installation of Stormwater chambers to capture and divert stormwater to Los Angeles County Sanitation District. This water will be used to augment the reclaimed water for regional use. This type of stormwater project is the first of its kind in California. o Status as of December 21, 2023: CONSTRUCTION IN PROGRESS  Plans sent over to OHL to provide an estimate on field re-grading and sump pumps in the vaults.
 OHL gathering materials and authorization to complete Punch List. o Remaining Punch List Items: funds are being added on the November 7th Staff Report.

Public Works Department November 2025 Monthly Report

Page 31 ends

o OHL has the parts at the Yard and is getting ready to start. o Working on scheduling for restarting this project with OHL o Dave Piece doesn’t have the budget for his staff to do inspections ; he is reaching out to Tetra-tech for help with inspection and Project Management. o Working with OHL to sign Amendment No.1
o Status as of April 24, 2024: Terminating contract with OHL for convenience and working with the Sanitation District to bring project to functional status. o Status as of May 20, 2024: No update
o Status as of June 24, 2024: Going to council to accept the O&M agreement from the LA County Sanitation District.
o Status as of July 25, 2024: No update
o Status as of October 30, 2024: Los Angeles Sanitation district is working on Punch List items, anticipated completion Mid- December.
o Status as of December 19, 2024: No update
o Status as of January 16, 2025: Los Angeles Sanitation District is completing the punch list items for commissioning.
o Status as of February 20, 2025: No update
o Status as of March 20, 2025: No update
o Status as of April 21, 2025: Work is nearing completion. The LA County Sanitation District is expected to be completed by the first week in May.
o Status as of May 22, 2025: On-going construction: Dugout chain-link installation has been completed on ball fields 1 and 2. Grading at the picnic area is ongoing. Trenches are open and ready for conduit installation.
o Status as of June 18, 2025: Sanitation district is expected to be complete with Punch List items by June 30th.
o Status as of July 24, 2025: LA County Sanitation District (LASD) is working on repairs due to water leak in the vault.
o Status as of August 20, 2025: Punch list items are currently being completed. o Status as of September 18, 2025: County completing punch list items ; OHLA requesting final payment; and preparing RFP for Operator for facility. o Status as of October 23, 2025: LA County is working through punch list items and operations and maintenance manual.
o Status as of November 20, 2025: Punch-list items continue to be addressed and, the 6-month operation and maintenance check is in progress.

• PW 1610: FOISIA PARK DESIGN
o Location: Foisia Park
o Description: Improve site condition of the existing park with the construction of new stage area, new picnic area, shade structures and new outdoor exercise stations as well as renovations to the athletic ballfields, playground, restrooms, concession building, marquee sign and parking lot
o Status: DESIGN
 A kick-off meeting with designer was conducted in early May to establish project schedule and verify City’s goals & objectives that shall be included in the design.  A job walk with staff and designer (ADL) was conducted on June 14, 2023. The job walk clarified and defined the project’s objectives and goals. The Community Services Director and Superintendent were in attendance and provided clear information to the designer with components and features that should be considered for the improvements.

Public Works Department November 2025 Monthly Report

Page 32 ends

 ADL is preparing preliminary concept plans to be reviewed by Community Services for a presentation to Council.
o Status as of October 26, 2023: In progress; concept to be presented to Council by P&R. o Status as of November 27, 2023: Designer has been advised to move forward with the concept design to construction documents design phase. Review of 1st plan submittals is estimated for December.
o Status as of January 22, 2024: Staff (Maintenance Superintendents & Supervisors) reviewed and discussed comments on the 50% design submittal of the improvement plans. Comments were shared and discussed with designers for them to address and include in next submittal (90% Submittal)
o Status as of March 20, 2024: Concept plan modified to include artwork near the front of the park.
 The designer is also proposing a concept for a front park marquee sign.  90% of the plans are scheduled to be submitted March 20, 2024. o Status as of April 29, 2024: Staff reviewed 90% of submittals. Designer to provide Estimate & Specifications. Advertise for Construction Bid is estimated to be published in June 2024.
o Status as of May 23, 2024:
 The designer recently brought our attention to the replacement of electrical switchgear that has outlived its service life. The estimated lead time for the switchgear is 45 weeks from the time of order. The electrical service to the facility needs to be modified for the new switchgear and brought up to compliance with current SCE standards. A pod-mounted transformer shall be installed near the existing power pole (main power source)
 The designer is wrapping up the design and preparing 100%PS&E for advertising tentatively scheduled June 6, 2024.
o Status as of June 24, 2024
 Pre-Bid conference will be held on June 18, 2024.
 An addendum will be sent to address a few items that need further details.  Bid opening due July 3, 2024.
o Status as of July 25, 2024
 Bids were opened on July 8, 2024
 The apparent lowest bidder was reviewed, and references were checked and was found to be a qualified contractor with a bid of $9.9M.  On July 18, 2024, apparently the lowest bidder requested their bid be withdrawn.

After further discussions with the contractor and a review of the public contract code with the City Attorney’s office, the contractor is continuing to pursue the withdrawal of their bid. All details of the bids and withdrawal of bids have been forwarded to the Director of Public Works for direction. o Status as of August 26, 2024
• After a review of the bids, the lowest responsive responsible bidder was identified. Staff prepared an agenda item to award the construction contract to Environmental Construction Inc (ECI). A week later ECI submitted an official request to withdraw bids. The 2
nd lowest bidder was
further evaluated and was eventually concluded to be the “lowest Public Works Department November 2025 Monthly Report

Page 33 ends

responsive responsible” bidder. Staff to present Award of Contract to PUB Construction Inc for $12,757,062 at the September 17, 2024, City Council meeting.
o Status as of September 23, 2024
 Project was awarded on the September 17th City Council Mtg to PUB Construction in the amount of $12,757,062. Contracts are routed for signature. Soon after the contract has been approved by the City Attorney, Mayor and City Clerk, it will be routed to Finance for issuance of Purchase Order.
 Pre-construction meeting will be scheduled soon after PO is issued and followed by start of construction (Notice to Proceed)
o Status as of October 30, 2024
 Construction Contract was awarded PUB Construction for $12M.  A preconstruction meeting is tentatively set for mid-November in anticipation of issuance of the Purchase Order by early November.
o Status as of December 19, 2024
 Contracts were circulated and approved. The issuance of a purchase order is contingent upon the correction of account numbers, listed in the Public Works council agenda item.
 Engineering staff were instructed to release the Notice to Proceed (NTP), ahead of the issuance of the Purchase Order.
 The Building Official was adamant that the designer fill and/or sign “Forms A and B”. However, the designers disagreed was it was their responsibility to execute.

There were several meetings and discussions over several weeks with all parties involved (contractor, construction managers, designers, and the Building Official).

Eventually the Building Official was presented with an alternate form that satisfied the requirement. Getting this item cleared is one of the items needed for Building and Safety to issue Grading Permits. Other required items have been presented to Building and Safety for their review and approval.
 The city’s labor compliance firm is initiating and coordinating various labor union requirements with the project contractor.

o Status as of January 16, 2025
 Pre-con meetings started
 Demo permit received
 Contractor mobilized and installed their site trailer  Fencing at site perimeter and interior was installed
 De-grubbing commenced
 Removal of park equipment commenced
o Status as of February 20, 2025:
 Continued grading throughout the site
o Status as of March 20, 2025: Grading continues throughout the site. Electrical underground work is ongoing along with irrigation trenching. Coordinating with the contractor to update electrical as-builts, as the existing as-builts do not match the current site conditions. o Status as of April 21, 2025: Musco lights and site lighting work is ongoing. Irrigation line work continues. Pressure tests are ongoing. Seat walls work is ongoing. Ball field # three (3) work is on-going.

Public Works Department November 2025 Monthly Report

Page 34 ends

o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o Status as of July 24, 2025: Formwork at the entry plaza is complete and ready for rebar installation. Form and rebar work at Ballfields Two and Three are complete and ready for concrete. New switchgear and pull boxes have been installed in the stage area, which is now ready for final grading.
o Status as of August 20, 2025: Footings dug for picnic shade structures. Bleacher shade sail footings and anchor bolts in place. Colored concrete poured in at the entry plaza. Ball field three ( 3) fence modification for scoreboard visibility. Entry plaza concrete poured and finished. Ball field two (2) concrete poured, finished, ready for bleachers. Miracle playground installation underway. Polygon stage structure installation underway. o Status as of September 18, 2025: The stage structure has seen its frame and shade sail posts installed, and roof installation is underway. The electrical work for the stage structure is complete, with sheet metal roofing work scheduled to begin next week. The picnic shade structure frame has been installed and is now ready for a concrete pour. For recreational areas, bleacher installation is underway, Miracle playground installation is ongoing, and concrete pathway work for Ballfields 1 & 3 is also ongoing. The infield has been cleared for irrigation layout. Regarding irrigation, the installation of laterals, heads, valves, and bubblers is ongoing, and the irrigation subcontractor is actively trenching and running lines through the ballfield areas. Monument signposts have been installed.  Status as of October 23, 2025:
o The new marquee sign is now installed and operational. The installation of playground equipment and the picnic shade structures is complete. For the new stage, the stem wall concrete has been cured, and the concrete for the stairs, ADA ramp, and stem walls has been poured after the area was infilled with dirt. The stage's picnic area concrete has also been sandblasted to create a consistent finish. In other areas, the south -east picnic area has been fine-graded, fertilized, and water-tested, and wells have been dug for new trees.

Landscaping and irrigation around the existing gym building are substantially complete. o Status as of November 20, 2025: Contractor has installed new tables at the picnic shade structure in the picnic area and continues irrigation and planting work at the Catskill parking lot. Soil preparation, amendments, and infield work are ongoing throughout the ballfield areas. Roofing work is progressing at the amphitheater and stage area. The playground is now ready for the installation of the rubberized playground tiles, and concrete has been poured around the stage picnic complex.

Fertilizer and soil amendments have also been distributed around the ballfields.

Concrete for the stage ADA ramp has been poured, and rebar has been installed for the upcoming colored concrete placement. Rubberized playground tile installation is now underway, and final grading and sod preparation for the ballfields continues, with fine grading and compaction of the infield mix in progress. Colored concrete has been poured, sheet metal roofing installation remains ongoing, and sandblasting, handrail installation, and artificial turf placement are scheduled f or next week. Dugout shade fabric installation is currently in progress. A 2 -inch lift of new asphalt has been placed at the Ravena parking lot, coverage tests have been completed, and the area is ready for sod. Concrete work in the stage area is now complete, and metal roofing installation continues. Work will continue as weather permits.

Public Works Department November 2025 Monthly Report

Page 35 ends

• PW 1636: MILLS PARK DESIGN
o Location: Mills Park
o Description: Improve site condition of the existing park with construction of new splash pad, outdoor restroom, and an outdoor full-court basketball area as well as renovations to picnic areas, installation of shade structures, marquee sign and parking lot o Status: AWARD CONTRACT
 Six (6) proposals were received in April.
 Staff reviewed and evaluated all proposals.
 Negotiations and discussions with the potential design consultant will be finalized by the end of May.
 Staff to award design contract tentatively scheduled for June 20th Council meeting.  The City Council approved the award of Design Services on June 20th CC mtg to David Volz Design (DVD). Contracts have been sent to DVD for execution.  Staff is waiting for fully executed contract along with issuance of purchase order to have the Kick-Off meeting with designer.
o Status as of October 26, 2023: Purchase order issued; Design Kick-Off Meeting conducted on October 24, 2023.
 Status as of November 27, 2023: Conducted a Kick-Off meeting with designer to discuss details and expectations for improvements at the park.
 Status as of January 22, 2024: Concept plans were provided by designer. Staff had further comments on the proposed improvements to the building. Staff will be discussing the details with the designer prior to the start of construction plans.  Status as of March 20, 2024: Designer has provided a 4th version of the concept. This will be the concept they will use to start preparing for construction plans. There’s a high probability that additional scope and cost will be requested by the designer due to the scope of work being broadened.
o Status as of April 29, 2024: Designer started construction plans soon after approval of concept plans. 50% plan submittal is estimated to be received in early May. o Status as of May 23, 2024: Designer provided 60% submittal. Staff is slightly delayed with its internal design review (two weeks)
o Status as of June 24, 2024
 Design of building expansion is estimated to be completed by December 2024.  Completion of site improvements will be ahead of the building expansion.  Staff is working with the designer to phase out construction in two stages.  A separate scope will be provided to the architect for the expansion of the building. o Status as of July 25, 2024
 The concept design for façade improvements of the building were received and shared with Parks staff for review and comments.
 Site plan improvements, 100% PS&E are in its final stage and scheduled to be advertised for bids (IFB) by early August.
o Status as of August 26, 2024
 Mills Park Project has been divided into two separate projects. Building Renovation Improvements will be assigned a different project number from Site Improvements Project No. 1636.
 Site improvement was advertised on August 8, 2024.

Public Works Department November 2025 Monthly Report

Page 36 ends

 Prebid meeting was held on August 14, 2024.
 Several questions were submitted by interested bidders which resulted in a couple addendums. All responses and addendums were provided to the contractor at the appropriate time.
 Bid opening is scheduled for September 4, 2024.
 Status as of September 23, 2024
• Bids opened and construction project is recommended to be awarded on the 10/1/24 City Council Mtg.
• If awarded construction is estimated to start early November to have approximately 6 months of construction
 Status as of October 30, 2024
• Construction Contract was awarded to MBC Enterprises for $3M. Staff immediately circulated the contract for execution.
• A preconstruction meeting will be scheduled once the release of PO has been determined.
 Status as of December 19, 2024
• The Building Official was adamant that the designer fill and/or sign “Forms A and B”. However, the designers disagreed was it was their responsibility to execute. There were several meetings and discussions over several weeks with all parties involved (contractor, construction managers, designers, and the Building Official). Eventually the Building Official was presented with an alternate form that satisfied the requirement. Getting this item cleared is one of the items needed for Building and Safety to issue Grading Permits. Other required items have been presented to Building and Safety for their review and approval.
• The city’s labor compliance firm is initiating and coordinating various labor union requirements with the project contractor.
o Status as of January 16, 2025
• Revised and finalized SWPPP and determined no LID required • Finalizing the grading permit requirements with designer and Bldg. & Safety
• Purchase Order issued
• Pre-construction tentative for the week of Jan 20
th.
o Status as of February 20, 2025:
• Pre-Construction meeting held on January 23,2025
• Notice to Proceed issued effective February 17, 2025, and mobilization began February 18, 2025
• Demolition is underway
o Status as of March 20, 2025:
• Demolition to be completed by March 21,2025.
• Survey for rough grading & rough grading be completed by end of March • Soils sample testing & underground utilities & trenching through March 4, 2025.
o Status as of April 21, 2025: No update
Public Works Department November 2025 Monthly Report

Page 37 ends

o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o Status as of July 24, 2025:
• Excavation for retaining walls, drainage infrastructure, and installation of underground electrical conduits and light pole foundations completed as well as grading for both the sidewalks/walkways and basketball court areas are completed.
• Over 65% of the conc seating walls as well as basketball court walls are installed, drainage lines are completed as well as light poles and fixtures are installed.
• Basketball court is graded and ready for conc pour.
• Change orders for unexpected underground utility conflicts impacting electrical, drainage, and shade structure footings over picnic areas were processed and are 90% completed.
• The basketball court is graded and prepared for concrete pour. Over10% of the walkway is prepared for concrete pour.
o Status as of August 20, 2025:
• The basketball court concrete pour has been completed. • The walkway around basketball court, wall “A” to the left of circular planter, and walkway between fitness area and playground is formed and rebar installed and will be poured on August 21,2025.
• Circular planter in the middle of the wall A is formed and ready for concrete pour. • Miscellaneous work such as subgrade compaction test at playground area, installation of rebar for curb south pf playground have been completed and concrete pour for said south curb is scheduled for August 22, 2025. • Status as of September 18, 2025: The walkway around basketball court was poured and later rejected due to the inconsistencies in the concrete finishes, grades, and presence of bird baths and numerous cracks developing. This work is currently being removed and replaced.
o Marian Landscaping subcontractor was installing some irrigation main lines o A Notice of default was sent to MBC (Contractor) citing the non- performance issues due to lack of acceptable progress rate, and failure to submit a detailed and satisfactory recovery schedule despite numerous notices provided to the Contractor. Additionally, concerns regarding the contractor’s lack of financial capacity in procuring required materials and requesting the City to help procuring such materials via joint checks, as well as failure to maintain required insurance coverage without lapse of policy impeding continuous work and access to the job site. o The City has decided to repackage the remaining work and advertise it in order to secure a new contractor to take over the work. • Status as of October 23, 2025:
o City decided to postpone the Mills Park Bldg Renovation advertisement initiated in August to include the repackaging of Mills Park Site Impr. Project in the hope of utilizing one contractor for the same location resulting in cost reduction.

Public Works Department November 2025 Monthly Report

Page 38 ends

o Proposal was obtained from the designer for repackaging the remining work and the production to repackage started in September.
o At the same time the termination of the current contractor (MBC) was initiated with the City Attorney and Notice of Termination was prepared and mailed out on October 17, 2025.
o The project scope is revised and amended during repackaging to include the removal of two additional Picnic Concrete pads and the Conc. Pad for the existing exercise equipment due to substantial cracks and old age.

Additionally, the exercise equipment is outdated and being replaced with new up- to-date design to incorporate various exercise activities more in demand. These being the only features not renovated as part of the original improvements.
o Due to the extensive questions raised by the prospective bidders during the postponement of Mills Park Bldg. Renovation Project to incorporate Mills Park Site improvements, the Purchasing Dept. requested to withdraw the Bid for Mills Park Bldg. and start fresh once the repackaging is completed. o A design re-package for Mills Park Site remaining work is being prepared and being incorporated into the Mills Park Bldg., including a quality control to eliminate redundancy and confusion between the two packages and is being advertised by late October/Early November.
• Status as of November 20, 2025: No update

• PROJECT NO. 1795: MILLS PARK BLDG RENOVATION
o Status as of Aug 26, 2024
 Staff to generate a new project number for this CIP.
 A few façade concepts were presented and discussed with Parks & Recreation.

Along with the façade concepts, a few different floor plans were presented and reviewed.
 After a few iterations of the interior floor plan and exterior facade, P&R provided approval on August 5, 2024. Designer is currently working on construction plans & specifications based on the approved concepts.
o Status as of October 30, 2024
 The consultant has provided 90% submittal. Staff will review for final revisions and package plans/specs for bidding.
o Status as of December 19, 2024
 The design consultant’s previous submittal was not at 90% completion. There were several missing details. The designer is working on addressing these items as well as providing specifications to resubmit at actual 90% completion. • Status as of January 16, 2025
 Progressing PS&E from 60% to 90%
 Prepared and determined no LID required
 Obtaining proposal for constructability review
 Finalizing the permit requirements through designer and Bldg. & Safety • Status as of February 20, 2025:
 100% PS&E submitted by the design Consultant BOA
 Finalize the constructability; review Task Order and, issued NTP for review  Constructability review currently underway
• Status as of March 20, 2025:
 Constructability review completed on March 6, 2025.

Public Works Department November 2025 Monthly Report

Page 39 ends

 Constructability review forwarded to Design Engineer on March 6, 2025.  Design consultant anticipates resubmittal on March 31, 2025. • Status as of April 21, 2025: No update
• Status as of May 22, 2025: No update
• Status as of June 18, 2025: No update
• Status as of July 24, 2025:
 Project advertised on April 24, 2025. Bids were opened on May 22, 2025. The bids were recommended to be rejected by the Purchasing Manager and concurred by the City Attorney due to irregularities and non-responsiveness of bidders.  The project will be re-bid after the bids are formally rejected. The bids were rejected on the council meeting day of June 17, 2025.
 Currently the project scope is being revised to include replacement of existing additional AC unit and electrical circuit boards, as well as addition of two electric vehicle charging stations with estimated submittal of end of August. • Status as of August 20, 2025:
• After further investigation, the City staff determined that the existing AC unit is a newer one and does not need to be replaced. Additionally, due to the small size of the existing parking lot, it has been decided to not install the two proposed electrical vehicle charging stations.
• The project plans and specifications are being revised currently to streamline to obtain consistent bids with additional language to avoid unnecessary time extension and change orders.
• Project is scheduled to be advertised mid-August and awarded by end of September.
• Status as of September 18, 2025: Project was reviewed and changes were made and it was readvertised on August 27, 2025, with a bid opening date of September 18, 2025. • After the new development unfolding on Mills Park Site project in respect to MBC, the City decided to repackage and advertise the Mills Park Site project as an addendum to the existing Mills Park BLDG Ren ovation Project. As such, the bid- opening is postponed to October 15, 2025, to allow for reassessing and repackaging the remining work and issuing an addendum to perform such work as a separate package under same advertisement by the newly awarded Contractor. • Status as of October 23, 2025: See the Mills Park Site status report. • Status as of November 20, 2025: No update

* On-going and maintenance related efforts at the Parks are also included within other categories below depending on the project management and type of work.

Building Improvements

• PW1632: COMMUNITY CENTER COILING WALL
o Location: Carson Community Center – 801 Carson St.
o Description: Removal and replacement of existing coiling wall at Community Center Hall A, B, and C. Renovations shall include, at a minimum upgrade to bring the facilities up to current standards and applicable California Building Code (CBC) standards. The project also includes upgrades to the existing lighting and sound system in Hall A, B, and C. o Budget: $1,700,000.00
o Status as of December 21, 2023: CONTRACTOR PROCUREMENT • Bids Came in at $3,450,000, evaluating bids.

Public Works Department November 2025 Monthly Report

Page 40 ends

• One option is to do a reduced scope to only include the walls. • Going to City Council on January 9, 2024.
o Status as of February 15, 2024: In conversation with the architect to divide the project into two.
o Status as of March 18, 2024: New task order being sent out to divide project into two. o Status as of April 24, 2024: No update
o Status as of May 15, 2024: BOA has submitted a proposal for the work. o Status as of June 24, 2024: BOA has submitted plans to Building and Safety for review, BOA has received comments back from Building and Safety and is addressing. o Status as of July 25, 2024: No update
o Status as of October 30, 2024: Caltec is addressing submittal comments and issued a request for Substitution, plan to be completed with Project June 2, 2025. o Status as of December 19, 2024: Caltech is beginning to demo on December 23,2024. o Status as of January 16, 2025: Caltech is working through abatement and scheduling issues.
o Status as of February 20, 2025: Abatement has been completed. Contractor is currently scheduled to be done by the end of July, with the most up-to-date approved schedule. o Status as of March 20, 2025: No update
o Status as of April 21, 2025: Project is currently on schedule, coiling wall has been removed.

Currently working on steel structure and framing.
o Status as of May 22, 2025: Project is currently running on schedule; scheduled completion date is mid-July.
o Status as of June 18, 2025: Project on schedule to be completed by mid-July. o Status as of July 24, 2025: Project is substantially complete. o Status as of August 20, 2025: Final punch list walk happened on August 20, 2025; minor items remain. Close-out is in process.
o Status as of September 18, 2025: Contractor to finish painting the ceiling; project close-out is in progress.
o Status as of October 23, 2025: Project substantially complete, electric outlet still needs to be reworked.
o Status as of November 20, 2025: Physical project completed; staff is working through disputes and close-out.

• PW1693: ELECTRIC VEHICLE CHARGING INFRASTRUCTURE (SCE CHARGE

READY PROGRAM)
o Location: 10 City Parks and Corporate Yard
o Description: Install 126 EV Chargers in City Parks and at the Corporate Yard o Budget: City staff labor to Project Manage, but no capital fund costs to City o Current Phase: DESIGN / PLAN CHECK
o Status as of June 22, 2023: Staff is reviewing easement documents and exhibits. o Status as of July 19, 2023: No Update
o Status as of August 17, 2023: No Update
o Status as of September 21, 2023: Plans have been approved by Building and Safety for Veterans Park, Dominguez Park, Carriage Crest Park, and Carson Park. o Status as of November 20, 2023: Staff has reviewed all easement documents, conveyance letters and plans received to date.
o Status as of January 3, 2024: No update
o Status as of January 22, 2024: No update
Public Works Department November 2025 Monthly Report

Page 41 ends

o Status as of February 15, 2024: No Update
o Status as of March 19, 2024: No Update. Staff reviewed all plans and easement documents to date.
o Status as of April 24, 2024: Staff participated in the pre-construction meeting for Veterans Park on April 23, 2024. Veterans Park construction is expected to begin on April 29, 2024, or May 6, 2024.
o Status as of May 20, 2024: No update
o Status as of August 26, 2024: No update
o Status as of December 19, 2024: No update
o Status as of January 16, 2025: No update
o Status as of February 20, 2025: No update
o Status as of March 20, 2025: No update
o Status as of April 21, 2025: Compliant MCH-2 forms have been submitted to Building and Safety. The remaining MCH forms will be submitted after the project is closed out. o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o Status as of July 24, 2025: No update
o Status as of August 20, 2025: No update
o Status as of September 18, 2025: No update
o Status as of October 23, 2025: No update
o Status as of November 20, 2025: No update

Electric Vehicle Charging
Infrastructure Location
Construction Start Date Anticipated Construction
Completion Date
Veterans Park Plan Review TBD
Dominguez Park Plan Review TBD
Anderson Park Submitted to Plan Check TBD
Corporate Yard 1 Plan Review TBD
Corporate Yard 2 In Design TBD
Carriage Crest Park Plan Review TBD
Carson Park Plan Review TBD
Dolphin Park Plan Review TBD
Stevens Park Plan Review TBD
Hemmingway Park Plan Review TBD
Hemmingway Aquatic Center Plan Review TBD

• PW 1720: ELEVATORS AT CITY HALL AND COMMUNITY CENTER
o Location: City-Hall and Community Center
o Description: Refurbish and Modernize Elevators at the Community Center and City Hall due to end-of-service life and maintainability. Elevators will be out of service during the active repair work for a duration of less than three months. o Status: CONSTRUCTION IN PROGRESS
 Contracts for construction are being routed for signatures.  Working with vendors to meet the insurance requirements.  Status as of October 26, 2023: Plans were approved by Building and Safety on 7/28/23. Staff is preparing bid documents and is planning to advertise project by November 2023.

Public Works Department November 2025 Monthly Report

Page 42 ends

o Status as of April 24, 2024: No update
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: No update
o Status as of December 19, 2024: No update
o Status as of January 16, 2025: No update
o Status as of February 20, 2025: No update
o Status as of March 20, 2025: No update
o Status as of April 21, 2025: No update
o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o Status as of July 24, 2025: No update
o Status as of August 20, 2025: No update
o Status as of September 18, 2025: No update
o Status as of October 23, 2025:
o Status as of November 20, 2025: No update

• PW 1726/1727: COMMUNITY CENTER COURTYARD & EAST PARKING LOT o Location: Community Event Center
o Description: Construction of Courtyard, outdoor amphitheater stage, wedding venues and installation of shade structures.
o Status: DESIGN
 Kick off meeting with the designer was conducted in early May to establish a project schedule and verify the City’s goals & objectives that shall be included in the design.
 A job walk with staff and designer (ADL) was conducted on June 6, 2023. The job walk clarified and defined the project’s objectives and goals. Community Services Superintendent and Supervisor were very informative to the designer with components and features that should be considered for the improvements.  ADL is preparing preliminary concept plans to be reviewed by Community Services for a presentation to Council.
 Status as of November 27, 2023: Designer has been advised to move forward with the concept design to construction documents design phase. Review of 1st plan submittals is estimated for December.
 Status as of January 22, 2024: Staff (Maintenance Superintendents & Supervisors) reviewed and discussed comments on the 50% design submittal of the improvement plans. Comments were shared and discussed with designers to address and include in next submittal (90% Submittal)

Status as of March 20, 2024: 90% of the Plans were submitted and currently in review by Engineering, Maintenance, Building and Safety and Planning.  Status as of April 29, 2024:
• Staff returned 90% design back to designer. The plans were missing information and staff deemed it to be at 60% level rather than 90% completion.
• The designer is expected to resubmit it in early May. • Project is estimated to advertise for bidding around mid-June.

Public Works Department November 2025 Monthly Report

Page 43 ends

 Status as of May 20, 2024: No update
 Status as of July 25, 2024: Bids are due to open on July 30, 2024.  Status as of August 26, 2024
• Bids opened on July 30, 2024, and the apparent lowest bidder withdrew bids a week later bid opening. The second lowest bidder (PCN3) was deemed responsive and responsible bidder with an amount of $9,989,558. • The award of construction contract is scheduled for September 17, 2024, the City Council Meeting.
o Status as of September 23, 2024
 Project was awarded on the September 17th City Council Mtg to PCN3 Construction in the amount of $9,989,558. Contracts are routed for signature.

Soon after the contract has been approved by City Atty, Mayor and City Clerk, it’ll be routed to finance for issuance of Purchase Order.
 Pre-construction mtg will be scheduled soon after PO is issued and followed by start of construction (Notice to Proceed)
o Status as of October 30, 2024
 The Pre-construction mtg was conducted and contractor was issued a NTP effective Oct 28, 2024.
 Contractor started to place fence around the perimeter of the work zone and have moved in the work trailer at the southerly end of the community center.  Project team have been reviewing various submittals provided by the contractor.  Application for WDID has been submitted to the State’s website waiting for issuance.
o Status as of December 19, 2024
 The Building Official was adamant that the designer fill and/or sign “Forms A and B”. However, the designers disagreed was it was their responsibility to execute.

There were several meetings and discussions over several weeks with all parties involved (contractor, construction managers, designers, and the Building Official).

Eventually the Building Official was presented with an alternate form that satisfied the requirement. Getting this item cleared is one of the items needed for Building and Safety to issue Grading Permits. Other required items have been presented to Building and Safety for their review and approval.
 The city’s labor compliance firm is initiating and coordinating various labor union requirements with the project contractor.
o Status as of January 16, 2025
 Demolishing and hauling away construction waste
 Finalizing the bypass system for the existing irrigation network  Over-excavation and rough grading-small and large courtyards  Rough grading and surveyor verifying rough grading- small and large courtyards  Marking and digging trench for UG utilities- small and large courtyards  Laying fabric & placing ¾” gravel- East Parking lot
 Forming and pouring zero curb- East Parking lot
 Installing new conduit for electrical wiring to the existing light pole- East Parking lot

Public Works Department November 2025 Monthly Report

Page 44 ends

o Status as of February 20, 2025:
 East Parking Lot installation of fabric and 3/8” aggregate as well as forming and pouring of the light pole footing, and forming rebar and pouring concrete for bollard poles, and installing pavers
 Large courtyard venue and stage excavation for underground storm pipe installation, surveying to stake the walls.
 Small Courtyard Venue excavation for underground storm pipe installation underway.
o Status as of March 20, 2025:
 East Parking Lot pavers are installed, and compaction is underway. Asphalt patching & striping to be completed by end of March
 Small courtyard storm drains piping installation & underground electrical conduits to be completed by end of March and start of wall footing in first week of April  Large courtyard and venue storm drains piping installation & retaining wall footings to be completed by end of March, underground electrical conduits and shade poles footing to get underway in April.
o Status as of April 21, 2025: No update
o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o Status as of July 24, 2025:
 Installation of underground electrical conduits, placement of the transformer and electrical cabinets, and concrete pours for sections of the walkways, ADA-compliant and circular ramps are completed.
 The seat wall in the smaller courtyard has been formed and poured, and the CMU wall enclosing the small courtyard is 75% complete.
 Additionally, drilling for sail footings at the Daycare Center is completed, poured and post for shade structures installed.
 Change orders issued and completed due to unforeseen underground utility conflicts, extension of retaining walls not included in the original scope and realignment of a portion of the existing 24” storm drain system due to interference with the infiltration/detention chambers as well as water main interference with the chamber re-route was completed.
 Chambers installed, backfilled and tested for compaction.  Concrete for the stage area is poured as well as half of the seating area to the left of stage and walkway leading to the stage is poured.
 Shade sails foundation and posts are installed.
 Irrigation lines within the planters are being installed as well as the fencing posts behind the stage installation currently underway.
o Status as of August 20, 2025:
 Concrete pouring for the seating area in front of the stage has been completed and the tile pavers for walkway leading to the stage have been installed.  The tile pavers on the sand within the walkways from the atrium to the small courtyard entrance are being installed and are 50% complete.  Polygon posts caps over stage are being installed
 Traffic control plan for closing of the Civic Center drive is under review for stationing the crane to install the fabric shade structure over the seating areas Public Works Department November 2025 Monthly Report

Page 45 ends

 Grading is underway for the North Plaza entrance and transition of the preserve area to the proposed walkways leading to the stage seating area and small courtyard
 Pergola posts for large courtyard area are being installed  Bollard light bases are being installed around the walkway leading to the atrium north side of the stage seating area
 The walls for the small courtyard area (3 Sides), and the planters have been completed.
 The water wall submittal has been approved, and the installation is scheduled for the last week of August.
o Status as of September 18, 2025: Polygon posts and frame structure over the stage have been installed utilizing a crane. The contractor is working to install the remainder of metal sheeting of the Polygon
 The tile pavers on the sand within the walkways in between the small courtyard and large courtyard is being completed. The Oval planters are placed in this area and getting ready for plantation
 Concrete for half of the walkway at the south entrance was poured  Grading is being completed at the south entrance and under the proposed retaining wall surrounding the future storage shed
 Grading is underway in the small courtyard for concrete slab under the tiles  Marina subcontractor is preparing testing the new irrigation lines and getting ready to finalize grading, amending the soil in preparation for planting  The gate walls at the entrance and exit to the small courtyard are being completed  The water wall and fountain basin construction are underway in the small courtyard and the fountain basin frame and plumbing are being completed and getting ready to pour concrete for the basin.
o Status as of October 23, 2025:
 Planting is being completed for the entire project. The planting in oval planters is underway and large palm trees are installed.
 All concrete hardscape and pavers in between the courtyards and the pavers in small courtyard are installed.
 The concrete walkway at the south entrance is completed as well as the retaining wall for the storage and the conc pad underneath the storage.  The irrigation lines, drip irrigation is completed and is being tested for operation.  All gates are installed throughout the project, as well as final fencing is completed  The waterfall is completed and is being tested for operation.  The cleanup is underway for grand opening of 10/23/25.  The maintenance crew is pressure washing the existing comm center walls and painting is underway for grand opening
 The Construction Team is preparing the punch list and preparing for substantial completion of the project.
o Status as of November 20, 2025: No update

Public Works Department November 2025 Monthly Report

Page 46 ends

• PROJECT: UNDERGROUND STORAGE TANK PROJECT
o Location: City Hall
o Description: Repairing the underground fuel storage tank due to the secondary pipe being cracked. The backup generator remains operational, and the main fuel pipe remains in good working condition.
o Status: CONSTRUCTION IN PROGRESS
 New fuel has been installed in the fuel tank, the fuel pump on the day tank needs to be repaired before Cummings can finalize the repairs. o Status as of April 24, 2024: No update. The estimated construction start date is June 2024.
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: No update
o Status as of December 19, 2024: No update
o Status as of January 16, 2025: Construction is substantially complete. Building and Safety inspected project on January 16, 2025. Contractor to finalize punch list items by end of January 2025. Staff will present contract Amendment No. 1 to City Council in February 2025 which includes a request for additional funding for work that was not part of the original bid documents.
o Status as of February 20, 2025: No update
o Status as of March 20, 2025: No update
o Status as of April 21, 2025: No update
o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o Status as of July 24, 2025: No update
o Status as of August 20, 2025: No update
o Status as of September 18, 2025: No update
o Status as of October 23, 2025:
o Status as of November 20, 2025: No update

• PW1786: CITY HALL RESTROOM AND KITCHENETTE UPGRADES
o Status as of May 20,2024: Material palette for all restrooms and City Council break room was selected on 5/14/2024. Estimated accelerated project schedule is as follows:
 100% Construction Drawings June 2024
 Submit to Building and Safety for Plan Check June 2024  Advertise July 2024
 Award Construction Contract August 2024
 Execute Contract and Issue Purchase Order August 2024  Preconstruction and Material Order August 2024
 Re-locate Staff August 2024
 Start Construction (2nd Floor and Council Area) September 2024 o Status as of June 20,2024: Plans were submitted to Building and Safety on June 12,2024.

Restroom floor plans for the North, East, and South wing need to be revised to accommodate door clearance requirements.
o Status as of July 25, 2024:

No update
o Status as of August 26, 2024: Staff will present Staff Report with File ID #2024-0708 on September 17, 2024, City Council Meeting to award a construction contract to Caltec Corporation. The estimated construction start date is October 2024.

Public Works Department November 2025 Monthly Report

Page 47 ends

o Status as of October 30,2024: Contractor started construction on 10/30/2024. The estimated completion date is March 2025.
o Status as of December 19, 2024: No update
o Status as of January 16, 2025: Ongoing construction in second floor lobby restrooms with estimated completion of March 2025. The estimated construction start date on first floor North and East wing restrooms is end of March 2025. Staff is preparing contract Amendment No. 1 to request additional funding for unforeseen conditions. Unforeseen conditions include mold remediation, asbestos abatement and air quality inspections, design modifications, improvements to existing electrical, plumbing, and framing. o Status as of February 20, 2025: Second floor lobby restrooms estimated to be complete at end of February 2025. Construction to begin on the first floor of the North and East wing restrooms in the first week of March 2025.
o Status as of March 20, 2025: Project is currently on hold until staff is given clarification on which proposed design revisions will be approved by city management. Changing the completed toilet partitions in the second-floor lobby restrooms will include a 6 -to-8-week lead time on material only, does not include installation. Re- designing the Council single- person restroom, break room, and first-floor restrooms will cause further delays to the project. Staff cannot provide an updated schedule for proposed design revisions until the re-design is complete, and the new finished material is selected. o Status as of April 21, 2025: Staff have been directed to redesign the toilet compartments of the second -floor lobby restrooms. Additionally, all first -floor restrooms, council single restroom, and council break room of City Hall will be going through a redesign phase per City of Carson Mayor and city management.
o Status as of May 22, 2025: Preliminary redesign of first floor North and East wing restrooms has been completed. Preliminary redesign of the Council single restroom and break room to be completed on May 23, 2025.
o Status as of June 18, 2025: No update.
o Status as of July 24, 2025: Construction plans for redesign were completed on July 18, 2025. Staff anticipate re-starting construction in August 2025. o Status as of August 20, 2025: Redesign plans are complete and approved by building and safety. Staff is reviewing the added costs from the contractor for all the redesigned items. o Status as of September 18, 2025: Project is currently on hold due to cost proposal from contractor for redesign plans. Redesign plans include layout and material modifications to all 1 st floor restrooms and kitchenettes, council break room and single restroom. Staff recommend keeping the original layout and material finishes per bid documents or limiting the design changes to only the council break room and single restroom. o Status as of October 23, 2025: Per meeting with Public Works Director and Mayor on 10/21/2025, staff has been directed to terminate the project and rebid for construction. o Status as of November 20, 2025: Staff are working with the City Attorney’s office to prepare a project suspension notice. The suspension notice will be sent to the Public Works Director for approval. This project is currently on hold.

• PW1787: CITY HALL 2ND FLOOR CARPET UPGRADES
• Status as of May 20,2024: Staff is proposing to advertise project in August,2024. Construction will start after Project No. 1786; second floor scope of work has been completed. o Status as of June 20,2024: No update
o Status as of July 25, 2024: No update
Public Works Department November 2025 Monthly Report

Page 48 ends

o Status as of August 26, 2024: Staff will present Staff Report with File ID #2024-0746 at September 17, 2024, City Council Meeting to award a construction contract to Rod-West Floor Covering LLC. The estimated construction start date is October 2024. o Status as of October 30,2024: Contractor to start resurfacing the concrete bands in November 2024 and the carpet replacement in December 2024. o Status as of December 19, 2024: No update
o Status as of January 16, 2025: Ongoing construction. Carpet installation at the first-floor lobby to be completed after the concrete band has been resurfaced. Selection of color and finish of concrete band is pending. The estimated project completion date is February 2025.
o Status as of February 20, 2025: Remaining carpet and punch list items to be completed in March 2025.
o Status as of March 20, 2025: Staff is working on punch list items with contractor. Carpet adjacent to display case will be complete by end of March 2025. o Status as of April 21, 2025: Contractor has completed the installation of carpet and base throughout the second floor , first-floor lobby, and the southwest stair exit corridor of City Hall. The contractor has resurfaced the concrete band throughout the first floor of City Hall.

Staff are working with the contractor to address final punch list items. On April 9, 2025, staff were verbally directed to continue the carpet installation in the Council Chambers.

Estimated lead time and delivery for carpet is between six - eight (6-8) weeks after shop drawing approval. Staff have directed the contractor to move forward with shop drawings and procurement of the carpet material for the Council Chambers. The estimated carpet install date in Council Chambers is June 2025.
o Status as of May 22, 2025: Additional carpet for the Council Chambers is expected to be delivered and installed in August 2025.
o Status as of June 18, 2025: No update.
o Status as of July 24, 2025: Carpet fabrication to be completed on July 25, 2025. Contractor to receive material week of July 28, 2025, and start installation after the first City Council meeting in August. Carpet installation to be completed in August 2025. o Status as of August 20, 2025: The carpet and base in the Council Chambers have been installed. Staff is working with contractors to address punch list items. o Status as of September 18, 2025: Carpet installation in the Council Chambers is complete.

Contractor has addressed punch list items. Staff will begin close-out of the project. o Status as of October 23, 2025: Carpet installation and punch list items are complete. Staff will begin to close out project.
o Status as of November 20, 2025: Staff report for project closeout is being prepared for the January 6, 2026, City Council Meeting.

OPERATIONS AND MAINTENANCE DIVISION

The Operations and Maintenance (O&M) Division is the second half of Public Works' Operations at the Corporate Yard. This Division is responsible for maintaining infrastructure within the public right -of-way (ROW) to ensure public safety. Additionally, th e O&M Division is responsible for environmental and hazardous waste clean-up, signage, pavement markings, striping, streets – asphalt & concrete, sidewalk sweeping, materials abatement, and construction. O&M also works with solid waste management including demolition and waste diversion, used oil collection, solid and organic waste, and streetlight maintenance/signal light malfunctions, electronic & beverage container recycling management. The assets of the D ivision include warehouse inventory, fleet vehicles, and heavy equipment. O&M also provides landscaping by tree trimming, ROW maintenance, median maintenance, and parkway trees. These Public Works Department November 2025 Monthly Report

Page 49 ends

services enable the safe use of public spaces, enhance the cleanliness of the city, and provide greenery to increase the beautification of the public ROW.

PROJECT: CONCRETE SIDEWALK GRINDING
This is an ongoing maintenance operation throughout the year for safe pedestrian travel. o Location: Citywide
o Description: The project involves grinding sidewalks and pathways identified as requiring grinding due to uplifting or posing a hazard to pedestrians. o In-house staff will be grinding sidewalk lifts per maintenance zones 1-7 as needed to eliminate sidewalk hazards immediately.

PROJECT: ANNUAL CITYWIDE PAVEMENT MAINTENANCE
o Status Update as of July 18, 2024
 IFB has been re-advertised and opened bids to achieve efficiencies, as this type of paving simultaneously in all districts was the first of its kind. o Status as of August 12, 2024: All American Asphalt was the lowest, responsible bidder in all districts 1,2,3 and 4.
o Status as of October 1, 2024
 F our paving phases have been completed.
o Status as of October 15, 2024
 Award of contract (consideration) Goes to City Council to All American Asphalt anticipated for 11/6/24 City Council Meeting.
o Status as of December 19, 2024
 Consideration of Award of Contract to All American Asphalt going to City Council on January 7, 2025. Phase five anticipated to start Mid- February 2025, weather permitting.
o Status as of January 16, 2025
 Award of contract (consideration) pending City Council approval.  Phase five (5) anticipated to start March/April 2025, contingent upon contract award by City Council.
o Status as of February 20, 2025:
 Contract awarded to All American Asphalt; Phase Five anticipated to start mid to late April.
o Status as of March 20, 2025: Citywide paving is scheduled to start mid to late April. o Status as of April 21, 2025: Phase Five is still on schedule to begin work mid to late April. o Status as of May 22, 2025: Phase Five is currently underway. The streets for Phases Six (6) and Seven (7) have been shared with the contractor.

Status as of June 18, 2025: Currently working on Phases 6 and 7 of the Annual Citywide Paving Maintenance Project.
o Status as of July 24, 2025: Phases 6 and 7 are complete. Stripping is being completed, along with finishing touches to the roadway.
o Status as of August 20, 2025: Phase 8 of the Annual Paving Project is scheduled to begin in late September.
o Status as of September 18, 2025: The Annual Paving project has been re-scheduled to start at the end of October.
o Status as of October 23, 2025: No update
o Status as of November 20, 2025: Staff are meeting with the team on November 24, 2025, to begin coordinating the next phase.

Public Works Department November 2025 Monthly Report

Page 50 ends

• PROJECT: ANNUAL CITYWIDE CONCRETE MAINTENANCE
o Status as of May 20, 2024: Contractor assigned a list of (backlog) priority locations to complete throughout the city.
o Status as of June 20, 2024: Contractor is working through the backlog priority locations. o Status as of July 25, 2024: Preparing list of backlog locations in Districts Three (3) and Four (4) for contractor to be assigned on August 1, 2024.
o Status as of August 26, 2024: Contractor completed previous list of locations on July 30, 2024. A new list of locations for CJ Concrete is being compiled to be sent on August 29, 2024; work is anticipated to start within two weeks from that date. o Status update as of Oct 10, 2024: List of locations completed in districts 1,2,3 and 4. o A list of new locations in districts 1, 2, 3 and 4 of (backlog) service request/work orders will be assigned to CJ Concrete anticipated for Mid-November 2024. o Status as of December 19, 2024: Backlog locations in Districts One (1) and Three (3) have been completed. Contractor to be assigned to Districts Two (2) and Four (4) in January 2025. A new list of locations in all four Council Districts will be provided to the con tractor per the contract budget up to June 2025. The contractor will use a two- to-three-week rotation for the seven maintenance zones. Service requests for any sidewalk hazards will be addressed immediately.
o Status as of January 16, 2025: Contractor completed the backlog locations in Districts 2 and 4. A new list of locations in all four of the districts will be provided to CJ Concrete per contract budget up to June 2025.
o Status as of February 20, 2025: CJ Concrete completed the list of locations provided to them in Districts 1 and 2 during this period.
o Status as of March 20, 2025: No update
o Status as of April 21, 2025: No update
o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o Status as of July 24, 2025: No update
o Status as of August 20, 2025: The next project, scheduled to begin in late August, will be completed by the Public Works Concrete Crew.
o Status as of September 18, 2025: No update
o Status as of October 23, 2025: No update
o Status as of November 20, 2025: No update

• ENVIRONMENTAL SERVICES-ONGOING
o Perform weekly patrol to identify and coordinate removal of illegal dumping, hazardous waste, and proper removal for bulky items.
o Monitoring construction & demolition projects for residents & businesses o Monitoring of median maintenance contractor citywide; provide maintenance directions as needed.
o Monitoring of abatement contractor and assign weed, debris, graffiti, and trash abatement citywide.
o Monitoring of street sweeping contractor.
o Perform Inspections & enforcement for SB 1383 – Organic Recycling, Edible Food Recovery, Food Recovery Organizations and Food Recovery Services o Interface with LA County Hazardous Waste Team to identify Haz. Mat. Items in the Right of Way
o Process Construction & Demolition documents through interaction with business owners and residents.
o Status as of April 21, 2025: E-waste & Paper Shredding event taking place on May 3, 2025. o Status as of May 22, 2025: Inspections for SB1383 are completed. Sanitation officers are following up. Monitor sidewalk sweeping. On-going
Public Works Department November 2025 Monthly Report

Page 51 ends

o Status as of June 18, 2025: Daily surveying of districts 1 -4, identifying illegally dumped items, bulky items, and illegal bins. Continuing to perform inspections and enforcement for SB 1383- organic recycling, edible food recovery, food recovery organizations, and food recovery services. Prepare/ Update/ Closeout 311 request/ work orders for sanitation areas.

Assist PW answering phone lines and routing calls and requests. On-going o Status as of July 24, 2025: Perform inspections and enforcement for SB 1383- Organic waste and recycling, edible food recovery, food recovery organizations and food recovery services. Interface with LA County Hazardous Waste Team to identify Hazardous Materials items in the right-of-way. E-mail Waste Resources daily sanitation requests. o Status as of August 20, 2025: Daily surveying of districts 1-4 includes identifying of illegally dumped items, bulky items, illegal bins. Prepare/Update/ Close out 311 orders for Sanitation areas. Process construction and demolition forms through interaction with business owners and residents. Process organic recycling forms through interaction with business owners.

Update implementation record for Cal Recycle.
o Status as of September 18, 2025: Performing Hot spot inspections on Wilmington between 213th and Carson Street.
o Environmental Services is preparing for E -Waste event on October 18 th from 8am- 12pm.

This event is in partnership with Waste Resources, Assemblyman Mike Gipson’s Office, and Assemblyman Josh Lowenthal’s Office.
o Status as of October 23, 2025:
o Status as of November 20, 2025: Continued process of compliance and enforcement for SB1383.

• MAINTENANCE: CONCRETE & ASPHALT
o Location: Citywide
o Description: Monthly summary of work performed by City maintenance crews who regularly inspect the City’s infrastructure and perform preventive maintenance to ensure safe and cost-effective operations
o Status as of April 24, 2024:
 Aggregate base and pavement maintenance are being performed on Lomita Boulevard.
 In preparation of the upcoming scheduled slurry seal projects , the team is doing asphalt patching and crack sealing in the designated locations. o Status as of May 20, 2024
 Pavement maintenance being performed on Lomita Boulevard  Preparation of the upcoming scheduled slurry seal projects, in June, the team is doing asphalt patching and crack sealing in the designated locations. o Status as of July 25, 2024
 The team has completed the slurry sealing projects along with asphalt patching and crack sealing in designated locations. Special concrete projects have been undertaken by our team at Anderson and Carson Parks.
o Status as of Sept. 30, 2024
 Pavement maintenance is being performed on Lomita Boulevard, ongoing maintenance and monitoring until CIP project takes place in 2025.  Preparation of the upcoming scheduled slurry seal projects, the team is doing asphalt patching and crack sealing in the designated locations. Update: All slurry seal preparation tasks were completed mid–July 2024.
 Our team continues to work on special concrete projects still in progress at Anderson Park – assignments completed October 10, 2024. o Status as of December 19, 2024
Public Works Department November 2025 Monthly Report

Page 52 ends

 The contractor will use a two- to-three-week rotation for the seven maintenance zones. Service requests to address large potholes, deteriorated surface areas and/or sinkholes due to sub-grade/base failures will be addressed immediately.  Temporary asphalt ramping will be used to eliminate sidewalk deviations for safe pedestrian travel until permanent concrete repairs can take place. o Status as of January 16, 2025
 Ongoing asphalt & concrete pavement maintenance and repair tasks by maintenance zones 1-7 on a 2 to 3 weeks rotation per maintenance zone. Also, immediate repair by service requests to eliminate known large potholes that pose hazards, deteriorated surface areas and/or sinkholes due to sub-grade/base failure or from undergrade structure failures.
 Temporary asphalt ramping to eliminate sidewalk deviations immediately for safe pedestrian travel until permanent concrete repairs can to place.  Vegetation and debris abatement/illegal dumping removal citywide. o Status as of February 20, 2025:
 On-going maintenance, repair/replacement of asphalt pavement sections maintenance zones 1-7
 Sidewalk inspection per maintenance zones 1-7 grinding, ramping for safe pedestrian travel and/or replacement
 On-going temporary repairs on Lomita Blvd. until CIP project takes place  Respond and address service requests city -wide for pavement, sidewalks/curb & gutter, illegal dumping and overgrown vegetation by priority. o Status as of March 20, 2025:
o Asphalt crew is currently working paving Del Amo eastbound from Main Street to Kay Calas bridge.
o Concrete is finishing up concrete maintenance on Broadacres. o Status as of April 21, 2025: Northbound Figueroa between Del Amo Blvd and I405 concrete, curb and gutter project scheduled for completion on April 24, 2025. Del Amo Blvd from Main Street to Kay Calas Bridge concrete project is scheduled for completion on April 23, 2025.
o Status as of May 22, 2025: Continued sidewalk maintenance from service request and work orders and service request. On-going
o Status as of June 18, 2025: Currently removing and replacing sidewalks around Caroldale Elementary and 224 th St now that school is out. Poured concrete at Calas Park in preparation for resurfacing pickle ball court. On-going o Status as of July 24, 2025: City crew continue to address sidewalk and pothole repairs, with city crews working in districts on a rotating basis every two weeks. o Status as of August 20, 2025: The Public Works Concrete Crew will be starting the largest in-house project to this date, on University Avenue. The project will begin at Pepperdine and extend right before Central. This major effort highlights the capacity of our in- house crew and will significantly improve accessibility and safety along University Avenue. See details below:
• Sidewalks: 10 feet wide on the Dominguez side of the street • Curb:8 inches high
• Project Lenth: 3,000 linear feet (Approximately three-quarters of a mile) o Status as of September 18, 2025: Concrete crew has begun working on installing sidewalks along University Avenue. Project is on-going.
o Sidewalk cleaning update: Abatement crew will be pressure washing sidewalks on Carson Street between Perry Ave and Martin Street as needed.
o Status as of October 23, 2025:

Public Works Department November 2025 Monthly Report

Page 53 ends

o Status as of November 20, 2025: Staff are working to complete sidewalk installation project on University Drive. Regular maintenance and complet ion of daily service requests is ongoing.

• MAINTENANCE: SIGNING & STRIPING AND GRAFFITI ABATEMENT o Location: Citywide
o Description: Monthly summary of work performed by City maintenance crews who regularly inspect the City’s infrastructure and perform preventative maintenance to ensure safe and cost-effective operations.
o Status as of October 2024:
 Traffic sign asset management underway (over 5,000 traffic signs) on the main arterial streets throughout the city . Replacements, upgrades per CA -MUTCD and repairs.
o Status as of May 20, 2024:
 Curb painting maintenance citywide.
 Fabricate and install new traffic signs per approved engineered traffic plans at various locations.
 ONGOING-Sign Shop- Fabricate traffic signs per California- Manual on Uniform Traffic Control Devices (CA-MUTCD) to replace deteriorated or obsolete signs that have surpassed their life expectancy and no longer have the proper reflectivity per MUTCD standards.
 Prepare for annual (in-house) citywide restriping to start by Mid-Nov. to early Dec. 2024 weather permitting.
o Status as of July 25, 2024
 Layout and re-striping of newly slurry sealed streets city-wide. o Status as of August 26, 2024
 Traffic signs & pavement marking maintenance citywide per maintenance zones one (1) through seven (7).
 Fabricate and install new traffic signs per work orders from city engineering division and service requests from the public regarding damaged and missing signage.
o Status as of December 19, 2024
 Layout and re-striping of newly slurry sealed streets city-wide.  Ongoing:
• Traffic signs & pavement marking maintenance citywide per maintenance zones one (1) through seven (7).
• Fabricate and install new traffic signs per work orders from the Engineering Division and public service requests.
o Status as January 16, 2025:
 Curb painting maintenance citywide.
 Fabricate and install new traffic signs per approved engineered traffic plans at various locations.
• ONGOING-Sign Shop-Fabricate traffic signs per California-Manual on Uniform Traffic Control Devices (CA-MUTCD) to replace deteriorated or obsolete signs that have surpassed their life expectancy and no longer have the proper reflectivity per MUTCD standards.
• Annual (in-house) citywide restriping will start after winter months winter months.
o Status as of January 16, 2025:

Public Works Department November 2025 Monthly Report

Page 54 ends

 Layout and re-striping of newly slurry sealed streets city-wide, weather permitting. • ONGOING
• Traffic signs & pavement marking maintenance citywide per maintenance zones one (1) through seven (7).
o Status as of February 20, 2025: Ongoing
 Fabricate and install new traffic signs per work orders from city engineering division and service requests from the public regarding damaged and missing  Graffiti Abatement citywide
 Restore/maintenance pavement markings per maintenance zones 1-7 o Status as of March 20, 2025:
 Fabricate and install new traffic signs per work orders from city engineering division and service requests from the public regarding damaged and missing  Graffiti Abatement citywide
 Restore/maintenance pavement markings per maintenance zones 1-7. o Status as of April 21, 2025: Ongoing
o Status as of May 22, 2025: Phase five of street maintenance has started. Layout and re- stripping of newly sealed streets will continue. On-going Status as of June 18, 2025: Continue to remove citywide graffiti. Red curb installation/ refresh around City Hall. Refresh/ paint yellow school zones. On-going o Status as of July 24, 2025: Continued efforts are underway to remove graffiti citywide, refresh curbs, repaint as needed, and re-fresh school yellow zone markings. o Status as of August 20, 2025: Responding to engineering request for ADA parking installations, and red curb designations to improve accessibility and traffic safety. Initiation of the annual restriping program for major streets throughout the city. o Status as of September 18, 2025: Street sweeping signs will be installed on Wilmington between 213th and Carson Street to allow for weekly cleaning. o Status as of October 23, 2025:
o Status as of November 20, 2025: Continued striping throughout city in areas where street paving has been completed.

TREE MAINTENANCE: TRIMMING CITYWIDE
o The city contract for tree maintenance is scheduled to expire in the Fall of 2024. Staff are gathering information to create an RFP.
o In-house tree crew working on (backlog) work order/service requests in all maintenance zones (1 – 7).
o In-house tree crew maintain newly planted trees according to tree watering route. o West Coast Arborist (city contractor) is currently working on the maintenance tree route. o Status as of late July 2024: Special tree planting projects started at Carson Park o Status as of August 26, 2024: Special tree planting was completed as scheduled. o Status as of December 19, 2024: West Coast Arborist (city contractor) is currently working on the maintenance tree routes.
o Status as of February 20, 2025:
 Tree pruning by city contractors in tree maintenance zones  In-house tree crew performing maintenance per maintenance zones 1-7  City crew planting new trees in locations where trees have been removed or need to be replaced
 Respond and address tree service requests city-wide
o Status as of March 20, 2025:
 Tree pruning by city contractors in tree maintenance zones  In-house tree crew performing maintenance per maintenance zones 1-7  City crew planting new trees in locations where trees have been removed or have died
Public Works Department November 2025 Monthly Report

Page 55 ends

 Respond and address tree service requests city-wide
o Status as of April 21, 2025: No update
o Status as of May 22, 2025: As trees are being removed, the crew is also planting replacement trees. The tree crew follows a weekly schedule to water newly planted trees, ensuring their successful establishment and healthy growth. On-going o Status as of June 18, 2025: Partnering with West Coast Arborist (WCA) to pick up and plant trees on Figueroa Street. Water trees citywide. Staff will be using the water trailer and the water tanker.
o Status as of July 24, 2025: Chinese Pistache trees planted on Eddington Dr. Planting of 19 Crepe Myrtle and Pink trumpet trees are pending approval on 224th St. Progress continues with daily trimmings throughout districts.
o Status as of August 20, 2025: Continue trimming of trees at parks and throughout maintenance zones for safety, visibility, and tree health. Planting Crepe Myrtle, Pink Trumpet, and Strawberry trees to fill vacancies. City -wide tree watering continues to be a primary focus to support and maintain the health of newly planted trees. o Status as of September 18, 2025: Tree trimming at Anderson Park has been completed in preparation for the Jazz Festival. Crews are trimming trees at Dominguez Park for the Country Western Festival. Next, crews will begin trimming Carson Park Palm and Coral trees.
o Status as of October 23, 2025:
o Status as of November 20, 2025: Planting multiple Crepe Myrtle and Pink Trumpet trees in District 4. Continued trimming for clearance throughout the city.

FLEET AND FACILITIES MAINTENANCE DIVISION

The Fleet & Facilities Maintenance Division is the second half of Public Works’ operations at the Corporate Yard. It is responsible for the maintenance and repair of the municipal and park facilities in addition to the City’s fleet vehicles and heavy equipment. These services enhance the cleanliness of the city, enable the safe use of public spaces, and provide greenery to increase the beautification of the city.

• PW 1640: PARK PLAYGROUND RUBBERIZED SURFACE REPLACEMENT o Location: All Parks that have rubberized play surfaces. Dolphin Park excluded. o Description: Replace the damaged and worn-out rubberized play surface at all parks o Status: ON HOLD
 City staff have used all available materials and are preparing a Purchase Order for additional materials to continue repair work.
o Status as of July 25, 2024: ON GOING
o Status as of August 26, 2024: ON GOING
o Status as of April 21, 2025: City staff continue to patch deteriorated areas at playgrounds city wide.
o Status as of May 22, 2025: No update
o Status as of June 18, 2025: City staff continue to patch deteriorated areas at playgrounds city wide.
o Status as of July 24, 2025: Replaced all the damaged and worn- out rubberized play surfaces at all parks except at Dolphin Park.
o Status as of August 20, 2025: No update
o Status as of September 18, 2025: Currently patching at Dominguez Park. o Status as of October 23, 2025: Ongoing
o Status as of November 20, 2025: Ongoing patching needed.

Public Works Department November 2025 Monthly Report

Page 56 ends

• PW 1712: PARK HVAC SYSTEMS
o Location: All Parks
o Description: Assess and replace over 50 HVAC units that are past their useful and serviceable life at all 12 park facilities. Design and install brand new HVAC at Veterans Park and Gym.
o Status: Anderson Park, Dolphin Park Office, Foisia Park Office have been completed. o Current Phase: PROJECT ONGOING
o Status as of February 21, 2024: No update
o Status as of April 24, 2024: No update
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: New package units have been procured. o Status as of February 20, 2025: No update
o Status as of March 20, 2025: 3 New Package Units installed at Hemingway Park. o Status as of April 21, 2025: Ongoing
o Status as of May 22, 2025: No update
o Status as of June 18, 2025: Additional AC Units procured for Stevenson Park Gym and Dominguez Park – Aquatics Center.
o Status as of July 24, 2025: Continuing to assess, replace and modernize over 50 HVAC units at all 12 park facilities.
o Designing and planning installation of brand-new HVAC system at Veterans Park and Gym. o Status as of August 20, 2025: Installation of AC Units at Stevenson Park (North Building) and Dominguez Park (Aquatics Center) have both been completed. o Status as of September 18, 2025: Procuring additional HVAC system for Stevenson Park. o Status as of October 23, 2025: No update
o Status as of November 20, 2025: No update

• P W1416: CALAS & FOISIA PARK RE-ROOFING
o Location: Calas & Foisia Park
o Description: Repair the roof at both snack bar and main office due to leaking roof. o Current Phase: Construction at Calas Park is Complete; Pre-procurement for Foisia Park o Status as of October 26, 2023: PROJECT COMPLETE
o PREPARING FORMAL PROJECT CLOSEOUT
o Status as of February 21, 2024: PROJECT CLOSEOUT
o Status as of April 24, 2024: No update
o Status as of May 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: No update
o Status as of January 16, 2025: Preparing scopes and specs for IFB in preparation for re- roof at Foisia Park.
o Status as of February 20, 2025: Ongoing
o Status as of March 20, 2025:
 Finalizing scope of work and preparation for IFB
o Status as of April 21, 2025: Scope of work has been completed preparing for IFB. o Status as of May 22, 2025: No update
o Status as of June 18, 2025: No update
o S tatus as of July 24, 2025: Repaired the roof at Calas Park snack bar and in the office due to the leaking roof.
 Preparing to repair the roof on Foisia Park snack bar and park office. o Status as of August 20, 2025: Preparing RFP
o Status as of September 18, 2025: Preparing RFP
o Status as of October 23, 2025: No update
Public Works Department November 2025 Monthly Report

Page 57 ends

o Status as of November 20, 2025: Scope of work completed.

• PROJECT 1630: ELECTRICAL PANEL UPGRADE
o Location: Anderson Park
o Description: Install new electrical panel and switch gear o Status as of September 21, 2023: Staff soliciting proposals. o Status as of February 21, 2024: Three proposals received. o Status as of March 18, 2024: Going to City Council Meeting on May 7 , 2024, to award contract.
o Status as of April 24, 2024: City Attorney’s Office is drafting contract. o Status as of May 20, 2024: Currently being advertised in four trade journals per City Attorney’s direction.
o Status as of June 20, 2024: No update
o Status as of July 25, 2024: No update
o Status as of August 26, 2024: In procurement
o Status as of January 16, 2025: No update
o Status as of February 20, 2025: No update
o Status as of March 20, 2025: Electrical switchgear and fabrication at Anderson Park o Status as of April 21, 2025: Currently constructing a custom-made s witch gear panel approximately six (6) months out to completion.
o Status as of May 22, 2025: No update
o Status as of June 18, 2025: Currently being fabricated o Status as of July 24, 2025: Currently being fabricated o Status as of August 20, 2025: Currently being fabricated o Status as of September 18, 2025: No update
o Status as of October 23, 2025: No update
o Status as of November 20, 2025: No update

• VETS PARK GYM FLOORING
o Location: Veterans Park
o Description: Replace gym floors and bleachers at Veterans Park. o Current Phase: Finalizing scope of work.
o Status as of May 22, 2025: No update
o Status as of June 18, 2025: In preparation of RFP
o Status as of July 24, 2025: IFB Bid Opening was July 3, 2025. Lowest Bid was from Geary Floors, Inc. for $140,000
o Status as of August 20, 2025: Going to Council on September 2, 2025, for award of contract.
o Status as of September 18, 2025: Contract Awarded. Installation commenced on September 15, 2025.
o Status as of October 23, 2025: Construction in progress, 80% complete o Status as of November 20, 2025: 100% Complete

• CITY HALL BACK-UP GENERATOR
o Location: City Hall
o Description: Making necessary repairs to the back-up generator at City Hall. o Status as of May 22, 2025: No update
Status as of June 18, 2025: Repairs are currently in procurement o Status as of July 24, 2025: Currently, making necessary repairs to the back -up generator at City Hall.
o Status as of August 20, 2025: Pending scheduling
o Status as of September 18, 2025: Parts have been ordered Public Works Department November 2025 Monthly Report

Page 58 ends

o Status as of October 23, 2025: No update
o Status as of November 20, 2025: Parts have been ordered, repairs scheduled for February 2026

• MODERNIZATION OF CITY VEHICLES TO ELECTRICAL VEHICLES o Location: Citywide
o Description: To improve air quality, reduce noise pollution, and lower greenhouse gas emissions.
o Status as of July 24, 2025: IFB Bid Opening was March 27, 2025, to purchase three (3) new Chevy Colorado LT Trucks. Lowest Bid was from TMAG Hemet F, LLC for $112,035.36  IFB Bid Opening was 6/5/25 to purchase eight (8) n ew 2025 Chevy LT FWD Mid- Size SUV Trucks. Lowest Bid was from Winner Chevrolet for $246,459.20 o Status as of August 20, 2025: 3 New Chevy Colorado LT Trucks and 3 New Chevy Blazers have been received.
o Status as of September 18, 2025: Seven (7) Mid-Size SUV have been ordered, estimated arrival is mid-October.
o Status as of October 23, 2025: Vehicles have been delivered, being inventoried and prepped to be put into service
o Status as of November 20, 2025: Eight (8) EV vehicles have been put into service, five additional EV’s are on order.

CITY OF CARSON

INFORMATION TECHNOLOGY & SECURITY
Capital Project Updates
November 2025
1 1. WIFI IN PARKS:

Description: WiFi Internet access at all City facilities to increase public safety, education, programs, and events.

Contract 1st Vendor: Datagear, Inc.
2nd Vendor: SkyNet Communications, Inc.

Term 3-year maintenance
Budget $420,272 ($350,000 [ARPA] + 70,272)
Current Spend $286,373.60 (68.14%)
Timeline May 15, 2023 – March 18, 2024
Status COMPLETED
Additional
Information
• Datagear completed seven (7) parks (Mills,
Carson, Veterans, Foisia, Stevenson, Anderson &
Dominguez). Notice of termination issued to
Datagear, on December 4, 2023.
• Replacement vendor, SkyNet Communications
completed the remaining five (5) parks in 5 days.

Park Completion Summary:

All 12 parks completed (100%)

2 2. TYLER UPGRADE / ENERGOV IMPLEMENTATION:

Description: Upgrade Tyler Munis to latest version, enable Cloud access, and add inventory module. Implement new planning, permitting, licensing, asset management, and citizen request software platform Energov.

Contract Tyler Munis/Integrated Technology Partners
Term 6 years
Budget 1.3M [ARPA]
Current Spend $921,965 incurred to date
Timeline September 30, 2022 - June 30, 2025
Status COMPLETED
• Employee Access Module - Complete
• EP&L Planning Module - Complete
• EP&L Permitting Module - Complete
• Open Finance (Socrata) Module - Complete
• 311 Civic Access Module - Complete
• EP&L Business License Module - Complete
• Enterprise Asset Management (EAM) Module – Complete

Tyler Modules Completion Summary:
7 modules completed (100%)

3 3. CITY HALL COUNCIL CHAMBERS AUDIO/VIDEO IMPROVEMENT Description: Upgrade Council Chambers broadcast equipment.

Contract Western AV
Term 5 years
Budget 550,000.00
Current Spend $542,544.57
Timeline December 1, 2023 - December 31, 2025
Status COMPLETED
Additional
Information
• RFP issued 12/1/23.
• Notice of Intent to Award 1/23/24.
• Contract Executed 5/1/24.
• Audiovisual Hardware Installation Complete.
• Agenda Management/AV Control Software
Implementation Complete.
• Agenda Management/AV Control Software Staff
Training Complete.
• Systems Testing and Punch List Item Complete.
• Project Completed 2/18/25.

Audio/Video Improvement Completion Summary:

Project completed (100%)

4 4. NETWORK SERVICES RELOCATION:

Description: Ensure rapid recovery, accessibility, and increased security for all business-critical application services by relocating to a more equipped offsite location.

Contract TBD
Term 5 years
Budget TBD
Current Spend $0
Timeline December 1, 2023 – December 31, 2025
Status ON SCHEDULE
• Planning for Phase 2 Relocation
Additional
Information
• RFP issued 12/1/23.
• Sole bid rejected 1/23/24.
• Data Center Colocation award to vendor 4/2/24.
• Contract Executed.
• Phase 1 Relocation completed 8/19/24.
• Phase 2 Relocation scheduled for 12/31/25.

Network Services Relocation Summary:

5 5. CITYWIDE MUNIICIPAL FIBER OPTIC NETWORK PHASE 1
Description: Launching Carson’s first high-speed fiber optic network—bringing faster, more reliable connectivity to parks across Districts 1, 2, 3, and 4.

Contract HP Communications
Term 5 years
Budget $27,000,000.00
Current Spend (Materials) $943,321.09
Timeline January 1, 2025 – June 30, 2026
Status ON SCHEDULE
• Pre-Construction meeting
scheduled for 12/1/25.
• Materials have been ordered and
are being stored onsite.
• Groundbreaking ceremony
completed.
• Transtech agreement completed.
• Permit review underway.

Citywide Municipal Fiber Optic Network Phase 1 Summary:

Project Name Citywide Fire Alarm Repairs and Enhancements Service Provider West Coast Fire & Integration
Summary July 5, 2022, Council approved the West Coast Fire & Integration contract for maintenance and monitoring services for all city fire systems from July 1, 2022, to June 30, 2027. Enhancing fire detection and safety for all facility users.

Update City staff is continuously working to enhance fire systems across all municipal facilities to align with the highest safety standards.

Project Name Public Safety/Emergency Services Community Initiatives Service Provider Public Safety/Emergency Services Department Summary Public Safety and Emergency Services Community Initiatives encompass a range of proactive efforts aimed at fostering safer and more resilient community. These initiatives typically involve engagement with the public, educational programs, and collaborative events. They focus on building positive relationships between law enforcement, emergency services personnel, and the community, ultimately enhancing preparedness and trust. Examples include public education on safety measures, community outreach events, and meetings to empower local leaders. Such Project Name Comprehensive Camera Coverage: City Facilities and Parks Service Provider Johnson Controls
Summary The Public Safety department is spearheading an initiative to implement video surveillance camera systems across all City and Park facilities. This proactive measure aims to discourage criminal activities and capture video evidence of any unlawful incidents. The objective is to enhance safety by reducing criminal incidents, creating a secure environment for both residents and park users.

Update
We’ve already successfully implemented video surveillance and access control systems at multiple parks, and the current phase focuses on expanding these efforts.

This includes the installation of additional pole-mounted cameras to extend surveillance coverage and integrate these new upgrades with the city’s existing security infrastructure.

We are also working closely with the Parks team to identify and confirm ideal camera placements at parks undergoing construction and updates. In some cases, this may include temporarily removing or relocating cameras to ensure they are not impacted by construction activities and can be seamlessly reintegrated once projects are complete. This collaboration ensures that new security measures are thoughtfully aligned with planned improvements and park layouts.

Our team continues to evaluate system performance and incorporate advanced monitoring technologies to strengthen overall safety. These enhancements are part of our broader commitment to creating a secure environment for all Carson residents, visitors, and employees.

Public Safety/Emergency Services Projects
initiatives are pivotal in strengthening the overall safety and well-being of a community.

Update Our Public Safety Enforcement Officers (PSEO) continue to work closely with the Carson Sheriff’s HOST Team to address ongoing issues at the MLK Library.

Parking Enforcement and Code Enforcement are gearing up for increased holiday outreach and education to ensure our residents are well-informed and supported throughout the season.

We have also been actively participating in several Neighborhood Watch meetings, most recently at Seaside Village alongside our Sheriff’s partners.

If you are interested in starting a neighborhood watch program, please reach out to Public Safety at 310-952-1786.

Project Name Enhancing Traffic Safety: Analysis of Accident Reduction and LPR Camera Deployment
Service Provider Motorola Solutions
Summary The consultant will supply the city with the most up-to-date version of the L-Series Rapidly Deployable Solar Powered Camera. This camera system, known as an Automatic License Plate Recognition (LPR) camera, will assist the City, in collaboration with the Los Angeles County Sheriff's Department, in capturing essential investigative information and enhancing the safety of its residents. These cameras will be strategically positioned in specific locations throughout the city, including public rights of way and entrances to city facilities.

The LPR system will collect comprehensive vehicle data, including make, model, color, and speed, both during daytime and nighttime conditions. The City's Public Safety department is working in partnership with LASD and Public Works to decrease traffic accidents within the city. Staff members have created data maps, and the Traffic Engineering Division will assess these maps to identify any recurring patterns and make infrastructure adjustments as necessary.

Update Current locations of our ALPR Trailers:

Dominguez Park- Country Western Fair
Intermodal Way- consistent issue with illegal dumping in the area in effort to combat, a trailer was deployed for visibility and deterrence.

Gardena/Broadway- assist to combat ongoing issues with illegal parking and activities from car clubs.

Project Name Upgrading Radio Systems Project
Service Provider Mission Critical Information Systems
Summary In 2021, the City Council granted approval for the 'Radio Upgrade Project,' which allocated funds for the procurement of radios, radio equipment, batteries, and chargers necessary for transitioning the City from its UHF radio system to the Los Angeles Regional Interoperability Communication System (LA-RICS).

Subsequently, the City Council sanctioned a contract with Mission Critical Information Systems to oversee the installation and programming, thus marking the successful completion of Phase 2 of the project. In September 2022, the City of Carson formalized a Hold Harmless Agreement with LA-RICS, granting the city the privilege of utilizing the platform.

Update We’re pleased to share that all radio installations have been successfully completed across multiple departments, significantly enhancing communication capabilities citywide. The distribution of Motorola APX4500 mobile radios is complete, supporting improved coordination and reliability throughout city operations. Radios continue to undergo flashing and maintenance as needed to ensure peak performance. Public Safety is working to complete mobile radio installations for the new Public Works fleet.

Project Name Organizational Resilience: Internal Emergency Management Training Service Provider Westward Disaster
Summary The city is responsible for the operation and management of its Emergency Operations Center (EOC), with the aim of enhancing preparedness, response, and recovery capabilities for emergencies and large-scale events. The consultant will furnish subject matter experts and instructors to aid in the creation and execution of a tailored EOC training program for city department staff.

Update
With the completion of our new Emergency Operations Center (EOC), we are now preparing to schedule the final training sessions in this fully operational space. In partnership with Westward, the City of Carson will move forward with planning and delivering role-specific training designed to equip staff with the skills needed for their assigned responsibilities. This final phase will ensure our team is fully prepared to activate and operate effectively during any emergency.

CITY OF CARSON 701 East Carson Street
Report to Honorable Mayor and City Council

CONSENT 21. To: Honorable Mayor and City Council From: Roobik Galoosian, Risk Manager RM Risk Management Subject: CONSIDER PURCHASING PUBLIC DIRECTORS AND OFFICERS LIABILITY, AND EMPLOYMENTPRACTICES LIABILITY INSURANCE POLICIES (CITY COUNCIL) I. SUMMARY
Recently staff, working with risk management counsel and insurance broker Marsh, reevaluated the City's Directors and Officers (D&O) Liability Insurance program to determine if other options with better coverage terms are available in the marketplace.   Marsh was able to obtain a proposal for a comprehensive D&O program for the City of Carson, which also contains direct Employment Practices Liability Insurance (EPLI) coverage with an affirmative duty to defend at a lower self-insured retention than the current PRISM program.  The total limits of the program are $15MM, with a $5MM sublimit for EPLI coverage.  The proposed program is hereby presented for City Council consideration and approval.

II. RECOMMENDATION
APPROVE the City's insurance broker, Marsh, to place Public Directors and Officers Liability insurance with $15,000,000 limit and including coverage for Employment Practices Liability with a sublimit of $5,000,000, with Landmark American Insurance Company, Ironshore Indemnity Inc., and Midvale Indemnity Company, at a total cost of $347,943.

III. ALTERNATIVES
TAKE any other action the City Council deems appropriate.

IV. BACKGROUND
Staff, working with risk management counsel and broker Marsh, have obtained a comprehensive D&O program for the City of Carson, which also contains direct EPLI coverage with an affirmative duty to defend at a lower self- insured retention than the current PRISM program.  The total limits of the program are $15MM, with a $5MM sublimit for EPLI coverage.

Historically, the City had no D&O coverage previously other than the limited coverage provided by the PRISM program.  The CRA’s D&O program, which is similar to the one now being obtained for the City, provided coverage for all of CRA’s defense costs in the CAM litigation.  Significantly, the proposed program offered by insurer RSUI contains no retroactive date and no prior acts exclusion of any kind. The new D&O program includes coverage for:
(a) claims against City directors and officers; (b) City indemnification of its directors and officers; and, most importantly, (c) claims against the City directly for errors or omissions.

As noted, the program includes $5MM of EPLI coverage for EPLI claims with an affirmative “duty to defend.”  This coverage contains a $150,000 per incident SIR, which is $100,000 lower than the current PRISM program, which provides coverage on an “indemnity only”, i.e. reimbursement, basis.  The PRISM program requires the City to pay all of its own defense costs for these EPLI claims until after the claim has been fully adjudicated and then seek reimbursement from the carrier.   The brokers have also affirmatively manuscripted into the policy that Aleshire & Wynder can defend these claims for the City with agreed upon rates paid by RSUI.

Total cost for this program is $347,943.

V. FISCAL IMPACT
Funding for this insurance placement is included and available in FY 2025/26 general fund budget in account 101-65-653-172-6028.

VI. EXHIBITS

1. Proposed Program Outline

Attachments
EXHIBIT 1 - City of Carson Proposed Program 25-26.pdf
Insurer Insurance Compan y Am Best Limit (M) Laye r Attach (M) Premium Per Mil X-Rate RSUI Landmark American Insurance Company A++ XV $5 Primary - D&O & EPL $0/$100k/$150 k $172,760 $34,552 n/a non-admitted Liberty Ironshore Indemnity Inc. A XV $5 1st Excess - D&O only $5 $99,817 $19,963 58% admitted Bowhead Midvale Indemnity Company A XV $5 2nd Excess D&O only $10 $69,872 $13,974 70% admitted $15 $342,449
Tax and Fees: $5,494
RSUI non-admitted layer is subject to CA Surplus
Lines tax (3%) and stamping fee (0.18%)
Total: $347,943Subject to: newly signed and dated main form application with completed warranty (previously submitted Travelers Application is acceptable) Key terms and endorsements
No Retro Date - full prior acts cover
Pending or Prior Litigation Exclusion as of Inception
Insurer Duty to Defend
Pre-Approved Counsel Endorsement (subject to rate cap) - Aleshire & Wynder: $325 partners / $275 associates / $120 paralegals Additional Side A Limit for Executives - $500k (excess of entire limit purchased, including excess policies, excess only - not DIC coverage) Sexual Abuse and Sexual Misconduct exclusion
Modified Insured v. Insured Exclusion - exception for former D's & O's at least 2 years removed Specified coverage for Public Officials
Full severabilty of application and full severability of exclusions Fully non-rescindable coverage
Sublimit for Defense Costs on non-monetary damages Claims - $250k sublimit per claim, $750k aggregate ($100k retention EPL
Includes Third Party discrimination and harassment coverage Includes defense costs for Wage and Hour claims - $100k sublimit ($150k retention) Includes sublimit for Federal Immigration and Nationality Act claims - $100k sublimit ($150k retention Excess Policies with Liberty and Bowhea
d
Follow D&O only and recognize erosion of EPL coverage in RSUI primary EXHIBIT 1
City of Carson
Proposed D&O/EPLI Program
CITY OF CARSON 701 East Carson Street
Report to Honorable Mayor and City Council
Tuesday, December 2, 2025, 5:00 PM
CONSENT 22. To: Honorable Mayor and City Council From: John Raymond, Executive Director CRA Administration Subject: CONSIDER APPROVAL OF A LOAN AGREEMENT WITH THE CARSON RECLAMATIONAUTHORITY IN THE AMOUNT OF $2,000,000; AND, RESOLUTION NO. 25-143 OF THE CITY OF CARSONAMENDING THE FISCAL YEAR 2025-26 BUDGET IN THE AMOUNT OF $2,000,000 TO FACILITATE THECARSON RECLAMATION AUTHORITY'S OPERATION AND SUPERVISION OF THE CONSTRUCTION OFIMPROVEMENTS ON THE FORMER CAL-COMPACT LANDFILL; THE 157 ACRE SITE (CITY COUNCIL) I. SUMMARY
This action proposes the approval of a Loan Agreement between the City of Carson and the Carson Reclamation Authority ("CRA") in the amount of $2,000,000 and certain adjustments to the City's FY 2025- 2026 Budget in order to account for the loan.

II. RECOMMENDATION
TAKE the following actions:

1. APPROVE A LOAN AGREEMENT WITH THE CARSON RECLAMATION AUTHORITY IN THE AMOUNT OF $2,000,000; AND

2. APPROVE RESOLUTION NO. 25-143 OF THE CITY OF CARSON AMENDING THE FISCAL YEAR 2025-26 BUDGET IN THE AMOUNT OF $2,000,000 TO FACILITATE THE CARSON RECLAMATION AUTHORITY'S

OPERATION AND SUPERVISION OF THE CONSTRUCTION OF IMPROVEMENTS ON THE FORMER CAL- COMPACT LANDFILL (THE 157 ACRE SITE)
III. ALTERNATIVES
TAKE another action the City Council deems appropriate.

IV. BACKGROUND
The City and the CRA have negotiated a Loan Agreement whereby the City would provide a loan in the amount of $2,000,000 (“City Loan”) to the CRA in order to facilitate its operation and oversight of the construction and improvements upon that certain real property owned by the CRA located at 20400 S.

Main Street, in the City of Carson (also known as the “Cal Compact Landfill” and/or the “157 Acre Site”).  This approval of the Loan Agreement would memorialize the terms and conditions of the City Loan to be provided to the CRA.

1. Terms of the Loan; Repayment.  On or before December 4, 2025, the City shall deposit to the CRA the amount of the City Loan (i.e., $2,000,000).  The City Loan shall be used solely by the CRA to facilitate its operation and oversight of the construction and improvements upon the 157 Acre Site, including the existing construction of Lenardo Drive and Stamps Drive and associated improvements (collectively, the “157 Acre Improvements”).

2. City Loan Payment; Forgiveness.  The City Loan shall bear interest at a rate of 3% per annum, and shall be repaid to the City by the CRA on or before the date that is ten (10) years following the Effective Date; provided however, that the City Loan may be forgiven in its entirety upon either of the following circumstances: (i) the completion of the 157 Acre Improvements, and/or (ii) approval by the City Council of the City of Carson.

3. Promissory Note.  Concurrently with execution of the Loan Agreement, the CRA shall execute a promissory note in favor of the City in the form of Exhibit A attached to the Loan Agreement.

4. Annual Review.  The CRA would make an annual presentation to the City Council on the status of the work performed pursuant to the loan.

V. FISCAL IMPACT
The City would use $2,000,000 from its Unrestricted General Fund Reserve to fund the City Loan.

VI. EXHIBITS

1. Loan Agreement

2. Resolution No. 25-143

Attachments
Loan Agreement (2060626.2)
Resolution No. 25-143.pdf
01223.0019 2060626.2

LOAN AGREEMENT
THIS LOAN AGREEMENT (“Agreement”) is dated as of ____________, 2025 (“Effective Date”) by and between the CITY OF CARSON, a California municipal corporation (“City” / “Lender”), and the CARSON RECLAMATION AUTHORITY, a California joint powers authority (“CRA” or “Borrower ). Lender and Borrower are sometimes referred to in this Agreement individually as a “Party” and collectively as the “Parties.” This Agreement is entered into with reference to the following recitals.

RECITALS
A. The City has agreed to provide a no- interest loan in the amount of $2,000,000 (“City Loan”) to the CRA in order to facilitate its operation and oversight of the construction and improvements upon that certain real property owned by the CRA located at 20400 S. Main Street, in the City of Carson (also known as the “Cal Compact Landfill” and/or the “157 Acre Site”). The City has reviewed and considered the terms of the City Loan and the public benefits that will be derived therefrom and has deemed it justifiable and in the best interest of the public and the City of Carson.

B. The Parties now desire to enter into this Agreement to memorialize the terms and conditions of the City Loan to be provided to Borrower.

NOW, THEREFORE, in consideration of the mutual promises set forth in this Agreement and other good and valuable consideration, the receipt and sufficiency of which is acknowledged by the Lender and Borrower, the Parties agree as follows:

1. Recitals Incorporated.

1.1. The Recitals set forth above are true and correct and are incorporated into this Agreement by this reference

2. Terms of the Loan; Repayment.

2.1. Loan Amount ; Distribution . On or before December 4 , 2025, t he City shall deposit to the Borrower the amount of the City Loan (i.e., $2,000,000).

2.2. Use Of City Loan. The City Loan shall be used solely by the Borrower to facilitate its operation and oversight of the construction and improvements upon the 157 Acre Site, including the existing construction of Lenardo Drive and Stamps Drive and associated improvements (collectively, the “157 Acre Improvements”).

2.3. City Loan Payment; Forgiveness. The City Loan shall bear interest in the amount of three percent (3%) annually, and shall be repaid to City by Borrower on or before the date that is ten (10) years following the Effective Date hereof; provided however , that the City Loan shall be forgiven in its entirety (including all interest accruing therewith) upon (i) the successful construction and completion of the 157 Acre Improvements, and (ii) the approval by the City 01223.0019 2060626.2 2
Council of the City of Carson. The CRA will make an annual presentation to the City Council on the status of work performed pursuant to the loan.

2.4. Promissory Note. Concurrently with execution of this Agreement, the CRA shall execute a promissory note substantially in the form of Exhibit A attached hereto.

3. GENERAL TERMS.

3.1. Authority to Execute. Each Party hereto represents and warrants that each of the persons executing this Agreement on behalf of such Party is empowered to do so and upon execution, the terms and conditions of this Agreement shall bind the respective Party to the terms hereof.

3.2. Amendments and Modifications. This Agreement may be amended only by written agreement of the Parties.

3.3. Severability. If any provision of this Agreement or the application of any such provision to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this Agreement that can be given effect without the invalid provision or application, and to this end the provisions of this Agreement are severable.

3.4. Counterparts. This Agreement may be executed in multiple counterparts, and all so executed shall constitute an agreement binding on the Parties. The Parties further agree that a digital or electronic signature shall have the same force and effect as a manual or wet-ink signature, and that a facsimile copy or a copy in pdf. format of the executed counterparts shall have the same force and effect as an original.

[SIGNATURES APPEAR ON THE FOLLOWING PAGE]

01223.0019 2060626.2
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the above Effective Date.

CITY:

CITY OF CARSON, a California municipal
corporation

By:_________________________________
Name: Lula Davis-Holmes
Title: Mayor

CRA:

CARSON RECLAMATION AUTHORITY,
a California joint powers authority

By:___________________________
Name: John Raymond
Title: Executive Director

APPROVED AS TO FORM:

By: ______
Sunny Soltani
City Attorney / CRA Legal Counsel

ATTEST
By: ____________________________
Dr. Khaleah K. Bradshaw
City Clerk / CRA Secretary
01223.0019 2060626.2

EXHIBIT A
[Attached]
01223.0019 2060626.2

PROMISSORY NOTE
$3,000,000 (“Loan Amount”) December ____, 2025 (“Effective Date) FOR VALUE RECEIVED, this Promissory Note is dated as of the Effective Date set forth above (“Promissory Note”) and evidences an indebtedness of the Carson Reclamation Authority, a California joint powers authority (“Maker”), to the City of Carson , a California charter city (“City” or “Holder”). For value received, the Maker hereby promises to pay to the order of Holder, at such address as Holder shall designate, the Loan Amount (as defined above ), without interest, in accordance with the terms of this Promissory Note.

1. Loan Agreement . The rights and obligations of Maker and Holder under this Promissory Note are made with respect to that certain agreement entitled “Loan Agreement” dated December ____, 2025, by and between Maker and Holder (“Agreement”). The terms and provisions of the Agreement are incorporated into this Promissory Note by reference. All capitalized terms used but not otherwise defined in this Promissory Note shall have the meanings ascribed to them in the Agreement.

2. Unsecured Obligation. Maker’s obligations under this Promissory Note are not secured by any instrument encumbering any property or asset of Maker.

3. Repayment of Promissory Note. Maker shall pay to the order of Holder the Loan Amount, together with all interest accrued thereon at a rate of three percent (3%) per annum , as follows: The Loan Amount together with all interest shall be repaid to Holder by Maker on or before the date that is ten (10) years following the Effective Date hereof; provided however , that the Loan Amount shall be forgiven in its entirety upon either of the following circumstances: (i) the successful completion of the 157 Acre Improvements, and/or (ii) approval by the City Council of the City of Carson.

4. Prepayment of Loan Amount. The Loan Amount or portions thereof, may be pre- paid by Maker without penalty.

5. Assignment. Maker shall not assign, transfer or convey this Promissory Note to any third party without the prior written consent of Holder, which consent may be granted or withheld in Holder’s sole discretion.

6. Successors Bound. This Promissory Note shall be binding upon the parties hereto and their respective heirs, successors and assigns.

7. Severability. The unenforceability or invalidity of any provision or provisions of this Promissory Note as to any persons or circumstances shall not render that provision or those provisions unenforceable or invalid as to any other person or circumstances, and all provisions hereof, in all other respects, shall remain valid and enforceable. 01223.0019 2060626.2 2

8. Governing Law. The validity, interpretation and performance of this Promissory Note shall be governed by and construed in accordance with the laws of the State of California, without regard to conflicts of laws principles.

9. Jurisdiction and Venue. The Holder and the Maker acknowledge and stipulate that the obligation hereunder was entered into in the County of Los Angeles, California. Any legal action or proceeding to interpret, enforce, or which in any way arises out of this Promissory Note shall be instituted and prosecuted in the appropriate court in the County of Los Angeles, California.

Holder and Maker expressly waive, to the maximum legal extent, any legal right either Party may have to have such action or proceeding transferred to or prosec uted in any other court or jurisdiction.

10. Amendments and Modifications. This Promissory Note may be amended or modified only in writing signed by the Holder and the Maker.

IN WITNESS WHEREOF, Maker has executed this Promissory Note as of the Effective Date.

Maker:

_________________________
Name:____________________
Title:_____________________
RESOLUTION NO. 25-143

A RESOLUTION OF THE CITY OF CARSON CITY COUNCIL AMENDING THE FISCAL YEAR 2025- 26 BUDGET IN THE AMOUNT OF $2,000,000 FOR THE PURPOSE OF EFFECTUATING A LOAN

AGREEMENT WITH THE CARSON RECLAMATION AUTHORITY FOR THE DEVELOPMENT OF

LENARDO DRIVE AND FURTHER PRIVATE DEVELOPMENT ON THE FORMER CAL-COMPACT

LANDFILL

WHEREAS, the City Council adopted the Fiscal Year 2025-26 (FY 25-26) budget on June 27, 2025 for the General Fund and Special Revenue Funds of the City via Resolution No. 25-076; and WHEREAS, the City of Carson and the Carson Reclamation Authority have negotiated a Loan Agreement whereby the City will provide a loan in the amount of $2,000,000 to the Authority for the purpose of assisting with the design, permitting, administration, and construction management costs associated with the development of public infrastructure on the property, as well as general site management costs during the construction period; and
WHEREAS, the Carson Reclamation Authority shall make an annual report to the City on the use of the loan proceeds and the status of the funded projects; and

WHEREAS, t h e C i t y C ou n c i l n o w d e s i r e s t o a m e n d t h e F Y 2 02 5-26 budget to appropriate funds in an amount not to exceed $2,000,000 from its General Fund Reserve to fund the purposes of the above-described Loan Agreement.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CARSON DOES HEREBY RESOLVE, FIND, DETERMINE, AND ORDER AS FOLLOWS:

Section 1. The following amendments will be made to the City’s FY 25-26 budget.

Account Description Increase/(Decrease)
578-99-999-501-6004- CRA Professional Services $2,000,000

Section 2. The City Clerk shall certify the adoption of this resolution and shall keep a copy of this resolution attached to the FY 25 -26 budget on file, and effective as of December 2, 2025, the same shall be in force and effect.

PASSED, APPROVED, and ADOPTED this 2nd day of December, 2025.

Lula Davis Holmes, Mayor
ATTEST:

Dr. Khaleah K. Bradshaw, City Clerk

APPROVED AS TO FORM:

Sunny Soltani, City Attorney

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.

CITY OF CARSON )

I, Dr. Khaleah K Bradshaw, City Clerk of the City of Carson, California, hereby attest to and certify that the foregoing resolution, being Resolution No. 25 -143, adopted by the City of Carson City Council at its meeting held on December 2, 2025, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

Dr. Khaleah K Bradshaw, City Clerk
CITY OF CARSON 701 East Carson Street
Report to Honorable Mayor and City Council
Tuesday, December 2, 2025, 5:00 PM
CONSENT 23. To: Honorable Mayor and City Council From: Nathan Freeman, Director of Community and Economic Development CD Administration Subject: CONSIDER AMENDING THE CONTRACT SERVICES AGREEMENT WITH Z&K CONSULTANTS,INC. TO DEVELOP A SPECIFIC PLAN FOR THE CARSON CIVIC CENTER TO ADD AN ALTERNATIVE TO THEHOTEL IN THE FORM OF AN ENTERTAINMENT, RETAIL AND RESTAURANT DEVELOPMENT (CITY COUNCIL) I. SUMMARY
At the January 21, 2025 City Council meeting, Council approved a contract services agreement with Z&K Consultants, Inc. for the development of a Carson Civic Center Specific Plan.  The City Civic Center Redevelopment Plan envisions modifying the layout, design, and programming of nearly 20 acres of City owned property.  The current uses include the existing City Hall building, adjacent events center, and supporting parking areas.  Initial concepts have included a five-star resort, performing arts theater, potential multi-family housing, interactive museum, teen/innovation center, remodeling of the existing events center, and new City Hall structure with retail opportunities.  An alternative consideration, rather than a hotel, is to develop an entertainment/retail/restaurant complex. To support incorporating this alternative land use into, and updating, the Specific Plan, an amendment to the agreement with Z&K Consultants would be necessary.

As such, staff is recommending City Council approve an amendment to the contract services agreement with Z&K Consultants, Inc. to increase the total compensation by $54,000.00 increasing the Contract Sum from $550,000.00 to $604,000.00 to allow Consultant to continue to provide services to include an alternative land use on the designated hotel site into the Specific Plan.

II. RECOMMENDATION
TAKE the following actions:

1. APPROVE Amendment No. 1 to the agreement with Z&K Consultants, Inc. to include an alternative to, and update the Carson Civic Center Specific Plan, to increase the total compensation by $54,000.00 increasing the Contract Sum from $550,000.00 to $604,000.00; and

2. AUTHORIZE the Mayor to execute Amendment No. 1 to the Z&K Consultants, Inc. agreement, following approval as to form by the City Attorney.

III. ALTERNATIVES
TAKE another action the City Council deems appropriate, subject to compliance with applicable law.

IV. BACKGROUND
At the January 21, 2025 City Council meeting, Council approved a contract services agreement with Z&K Consultants, Inc. for the development of a Carson Civic Center Specific Plan. The City Civic Center Redevelopment Plan envisions modifying the layout, design, and programming of nearly 20 acres of City owned property. The current uses include the existing City Hall building, adjacent events center, and supporting parking areas. Initial concepts have included a five-star resort, performing arts theater, potential multi-family housing, interactive museum, teen/innovation center, remodeling of the existing events center, and new City Hall structure with retail opportunities.

Specifically, the Carson Civic Center Redevelopment Project aims to re-imagine and invigorate the Civic Center as a thriving, inclusive hub that captures the essence of Carson’s unique cultural heritage and vibrant community. This transformative initiative envisions a harmonious blend of residential, commercial, and cultural spaces designed to create a dynamic downtown atmosphere, drawing people in at all times of the day and night. Through thoughtful urban design, sustainable planning, and a commitment to accessibility, the project will create a welcoming environment that celebrates Carson’s past while looking toward its future.

This revitalized Civic Center will serve as the "heart" of Carson, fostering connections, supporting public events, and establishing a legacy of value and beauty for the community and region.

The initial concept included a five-start resort but, rather than a hotel, an alternative consideration is to develop an entertainment/retail/restaurant complex. This would create a greater variety of options in this space. To support incorporating this alternative land use into, and updating, the Specific Plan, an amendment to the agreement with Z&K Consultants would be necessary. As such, staff is recommending City Council approve an amendment to the contract services agreement with Z&K Consultants, Inc. to increase the total compensation by $54,000.00 increasing the Contract Sum from $550,000.00 to $604,000.00 to allow the consultant to continue to provide services to include an alternative land use on the designated hotel site into the Specific Plan.

V. FISCAL IMPACT
There is no fiscal impact as there are funds in the Community and Economic Development Department account number 101-70-701-100-6004 from the 2025/26 Fiscal Year budget to fund the proposed amendment with Z&K Consultants, Inc. in the amount of $54,000.

VI. EXHIBITS

1. Exh 1 - Z&K Contract Services Agreement

2. Exh 2 - Z&K Amendment Proposal

3. Exh 3 - Proposed Amendment No. 1 to Z&K Contract Services Agreement

Attachments
EXH 1 - Z&K Contract Services Agreement
EXH 2 - Z&K Amendment Proposal
EXH 3 - (Z&K Consultants) Amendment No. 1 - Civic Center SP FINAL.pdf

CONTRACT SERVICES AGREEMENT
By and Between

CITY OF CARSON
and
Z & K CONSULTANTS, INC.

AGREEMENT FOR CONTRACT SERVICES

BETWEEN THE CITY OF CARSON AND
Z & K CONSULTANTS, INC.

THIS AGREEMENT FOR CONTRACT SERVICES (herein <Agreement=) is made and entered into this <Z| <'day of Y , 2025 by and between the CITY OF CARSON, a California municipal corporation (<City=) and Z & K CONSULTANTS, INC., a California corporation (<Consultant=). City and Consultant are sometimes hereinafter individually referred to as <Party= and hereinafter collectively referred to as the <Parties.=

RECITALS
A. City has sought, by issuance of a Request for Proposals or Invitation for Bids seeking proposals for Professional Services 4 City of Carson Civic Center Specific Plan, dated November 7, 2024, for the performance of the services defined and described particularly in Article 1 of this Agreement.

B. Consultant, following submission of a proposal or bid for the performance of the services defined and described particularly in Article 1 of this Agreement, was selected by the City to perform those services.

C. Pursuant to the City of Carson9s Municipal Code, City has authority to enter into and execute this Agreement.

D. The Parties desire to formalize the selection of Consultant for performance of those services defined and described particularly in Article 1 of this Agreement and desire that the terms of that performance be as particularly defined and described herein.

OPERATIVE PROVISIONS
NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows:

ARTICLE 1. SERVICES OF CONSULTANT

1.1 Scope of Services.

In compliance with all terms and conditions of this Agreement, the Consultant shall provide those services specified in the <Scope of Services= attached hereto as Exhibit <A= and incorporated herein by this reference, which may be referred to herein as the <services= or <work= hereunder.

As a material inducement to the City entering into this Agreement, Consultant represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the services required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein. Consultant shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services 01007.0001/644685.1 -l-
described herein. Consultant covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose intended. For purposes of this Agreement, the phrase <highest professional standards= shall mean those standards of practice recognized by one or more first- class firms performing similar work under similar circumstances.

1.2 Consultant9s Proposal.

The Scope of Service shall include the Consultant9s scope of work or bid which shall be incorporated herein by this reference as though fully set forth herein. In the event of any inconsistency between the terms of such proposal and this Agreement, the terms of this Agreement shall govern.

1.3 Compliance with Law.

Consultant shall keep itself informed concerning, and shall render all services hereunder in accordance with, all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental entity having jurisdiction in effect at the time service is rendered.

1.4 Licenses, Permits, Fees and Assessments.

Consultant shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Consultant shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Consultant9s performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City, its officers, employees or agents of City, against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder.

1.5 Familiarity with Work.

By executing this Agreement, Consultant warrants that Consultant (i) has thoroughly investigated and considered the scope of services to be performed, (ii) has carefully considered how the services should be performed, and (iii) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. If the services involve work upon any site, Consultant warrants that Consultant has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder. Should the Consultant discover any latent or unknown conditions, which will materially affect the performance of the services hereunder, Consultant shall immediately inform the City of such fact and shall not proceed except at Consultant9s risk until written instructions are received from the Contract Officer.

1.6 Care of Work.

The Consultant shall adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such 01007.0001/644685.1 -2-
damages, to persons or property, until acceptance of the work by City, except such losses or damages as may be caused by City9s own negligence.

1.7 Further Responsibilities of Parties.

Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified, neither party shall be responsible for the service of the other.

1.8 Additional Services.

City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Services or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written order is first given by the Contract Officer to the Consultant, incorporating therein any adjustment in (i) the Contract Sum for the actual costs of the extra work, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Consultant. Any increase in compensation of up to ten percent (10%) of the Contract Sum or $25,000, whichever is less; or, in the time to perform of up to one hundred eighty (180) days, may be approved by the Contract Officer. Any greater increases, taken either separately or cumulatively, must be approved by the City Council. It is expressly understood by Consultant that the provisions of this Section shall not apply to services specifically set forth in the Scope of Services. Consultant hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Services may be more costly or time consuming than Consultant anticipates and that Consultant shall not be entitled to additional compensation therefor. City may in its sole and absolute discretion have similar work done by other contractors. No claims for an increase in the Contract Sum or time for performance shall be valid unless the procedures established in this Section are followed.

1.9 Special Requirements.

Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the <Special Requirements= attached hereto as Exhibit <B= and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit <B= and any other provisions of this Agreement, the provisions of Exhibit <B= shall govern.

ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT.

2.1 Contract Sum.

Subject to any limitations set forth in this Agreement, City agrees to pay Consultant the amounts specified in the <Schedule of Compensation= attached hereto as Exhibit <C= and incorporated herein by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed Five Hundred Fifty Thousand Dollars and Zero Cents ($550,000.00) (the <Contract Sum=), unless additional compensation is approved pursuant to Section 1.8. 01007.0001/644685.1 -3-

2.2 Method of Compensation.

The method of compensation may include: (i) a lump sum payment upon completion; (ii) payment in accordance with specified tasks or the percentage of completion of the services, less contract retention; (iii) payment for time and materials based upon the Consultant9s rates as specified in the Schedule of Compensation, provided that (a) time estimates are provided for the performance of sub tasks, (b) contract retention is maintained, and (c) the Contract Sum is not exceeded; or (iv) such other methods as may be specified in the Schedule of Compensation.

2.3 Reimbursable Expenses.

Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, telephone expenses, and travel expenses approved by the Contract Officer in advance, or actual subcontractor expenses of an approved subcontractor pursuant to Section 4.5, and only if specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Consultant at all project meetings reasonably deemed necessary by the City.

Coordination of the performance of the work with City is a critical component of the services. If Consultant is required to attend additional meetings to facilitate such coordination, Consultant shall not be entitled to any additional compensation for attending said meetings.

2.4 Invoices.

Each month Consultant shall furnish to City an original invoice for all work performed and expenses incurred during the preceding month in a form approved by City9s Director of Finance.

By submitting an invoice for payment under this Agreement, Consultant is certifying compliance with all provisions of the Agreement. The invoice shall detail charges for all necessary and actual expenses by the following categories: labor (by sub-category), travel, materials, equipment, supplies, and sub-contractor contracts. Sub-contractor charges shall also be detailed by such categories. Consultant shall not invoice City for any duplicate services performed by more than one person.

City shall independently review each invoice submitted by the Consultant to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. Except as to any charges for work performed or expenses incurred by Consultant which are disputed by City, or as provided in Section 7.3, City will use its best efforts to cause Consultant to be paid within forty-five (45) days of receipt of Consultant9s correct and undisputed invoice; however, Consultant acknowledges and agrees that due to City warrant run procedures, the City cannot guarantee that payment will occur within this time period. In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Consultant for correction and resubmission. Review and payment by City for any invoice provided by the Consultant shall not constitute a waiver of any rights or remedies provided herein or any applicable law.

2.5 Waiver.

Payment to Consultant for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Consultant.
01007.0001/644685.1 -4-
ARTICLE 3. PERFORMANCE SCHEDULE

3.1 Time of Essence.

Time is of the essence in the performance of this Agreement.

3.2 Schedule of Performance.

Consultant shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the <Schedule of Performance= attached hereto as Exhibit <D= and incorporated herein by this reference. When requested by the Consultant, extensions to the time period(s) specified in the Schedule of Performance may be approved in writing by the Contract Officer but not exceeding one hundred eighty (180) days cumulatively.

3.3 Force Majeure.

The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Consultant, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Consultant shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer9s determination shall be final and conclusive upon the parties to this Agreement. In no event shall Consultant be entitled to recover damages against the City for any delay in the performance of this Agreement, however caused, Consultant9s sole remedy being extension of the Agreement pursuant to this Section.

3.4 Term.

Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding one (1) years from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit <D=).

ARTICLE 4. COORDINATION OF WORK

4.1 Representatives and Personnel of Consultant.

The following principals of Consultant (<Principals=) are hereby designated as being the principals and representatives of Consultant authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith:

Crystal Fraire, PE President
(Name) (Title)
01007.0001/644685.1 -5-
Zack Fagih, PE Vice President
: ane) Title)
Brittany Duhn, PE roject Manager
(Name) (Title)
It is expressly understood that the experience, knowledge, capability and reputation of the foregoing principals were a substantial inducement for City to enter into this Agreement.

Therefore, the foregoing principals shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. All personnel of Consultant, and any authorized agents, shall at all times be under the exclusive direction and control of the Principals. For purposes of this Agreement, the foregoing Principals may not be replaced nor may their responsibilities be substantially reduced by Consultant without the express written approval of City. Additionally, Consultant shall utilize only competent personnel to perform services pursuant to this Agreement. Consultant shall make every reasonable effort to maintain the stability and continuity of Consultant9s staff and subcontractors, if any, assigned to perform the services required under this Agreement. Consultant shall notify City of any changes in Consultant9s staff and subcontractors, if any, assigned to perform the services required under this Agreement, prior to and during any such performance.

4.2 Status of Consultant.

Consultant shall have no authority to bind City in any manner, or to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Consultant shall not at any time or in any manner represent that Consultant or any of Consultant9s officers, employees, or agents are in any manner officials, officers, employees or agents of City. Neither Consultant, nor any of Consultant9s officers, employees or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City9s employees. Consultant expressly waives any claim Consultant may have to any such rights.

4.3 Contract Officer.

The Contract Officer shall be Robert Lennox, Ed.D., Assistant City Manager, or as otherwise designated by the City Manager. It shall be the Consultant9s responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and the Consultant shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority, if specified in writing by the City Manager, to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.

4.4 Independent Consultant.

Neither the City nor any of its employees shall have any control over the manner, mode or means by which Consultant, its agents or employees, perform the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Consultant9s employees, servants, representatives or agents, or in fixing their number, 01007.0001/644685.1 -6-
compensation or hours of service. Consultant shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Consultant shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Consultant in its business or otherwise or a joint venturer or a member of any joint enterprise with Consultant.

4.5 Prohibition Against Subcontracting or Assignment.

The experience, knowledge, capability and reputation of Consultant, its principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, Consultant shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Consultant, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Consultant or any surety of Consultant of any liability hereunder without the express consent of City.

ARTICLE 5. INSURANCE AND INDEMNIFICATION

5.1 Insurance Coverages.

The Consultant shall procure and maintain, at its sole cost and expense, in a form and content satisfactory to City, during the entire term of this Agreement including any extension thereof, the following policies of insurance which shall cover all elected and appointed officers, employees and agents of City:
(a) General Liability Insurance (Coverage Form ISO CGL CG 00 01 or equivalent). A policy of comprehensive general liability insurance written on a per occurrence basis for bodily injury, personal injury and property damage. The policy of insurance shall be in an amount not less than $1,000,000.00 per occurrence or if a general aggregate limit is used, then the general aggregate limit shall be twice the occurrence limit. (b) | Worker9s Compensation Insurance. A policy of worker9s compensation insurance in such amount as will fully comply with the laws of the State of California and which shall indemnify, insure and provide legal defense for the Consultant against any loss, claim or damage arising from any injuries or occupational diseases occurring to any worker employed by or any persons retained by the Consultant in the course of carrying out the work or services contemplated in this Agreement, with Employer9s Liability insurance coverage limits of at least $1,000,000.00.
(c) Automotive Insurance (Coverage Form ISO CA 00 01 including <any auto= and endorsement CA 0025 or equivalent), A policy of comprehensive automobile liability 01007.0001/644685.1 -7-
insurance written on a per occurrence for bodily injury and property damage in an amount not less than $1,000,000. Said policy shall include coverage for owned, non-owned, leased, hired cars and any automobile.
(d) Professional Liability. Professional liability insurance appropriate to the Consultant9s profession, as determined by the City9s Risk Manager, provided that the limits shall be no less than $1,000,000 per claim and no less than $1,000,000 general aggregate. This coverage may be written on a <claims made= basis, and must include coverage for contractual liability. The professional liability insurance required by this Agreement must be endorsed to be applicable to claims based upon, arising out of or related to services performed under this Agreement. The insurance must be maintained for at least 5 consecutive years following the completion of Consultant9s services or the termination of this Agreement. During this additional 5-year period, Consultant shall annually and upon request of the City submit written evidence of this continuous coverage.
(e) Subcontractors. Consultant shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall include all of the requirements stated herein. (f) Additional Insurance. Policies of such other insurance, as may be required in the Special Requirements in Exhibit <B=.
(g) Broader Coverages and Higher Limits. Notwithstanding anything else herein to the contrary, if Consultant maintains broader coverages and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverages and/or higher limits maintained by Consultant.

5.2 General Insurance Requirements.

All of the above policies of insurance shall be primary insurance and shall name the City, its elected and appointed officers, employees and agents as additional insureds and any insurance maintained by City or its officers, employees or agents may apply in excess of, and not contribute with Consultant9s insurance. The insurer is deemed hereof to waive all rights of subrogation and contribution it may have against the City, its officers, employees and agents and their respective insurers. Moreover, the insurance policy must specify that where the primary insured does not satisfy the self-insured retention, any additional insured may satisfy the self-insured retention.

All of said policies of insurance shall provide that said insurance may not be amended or cancelled by the insurer or any party hereto without providing thirty (30) days prior written notice by certified mail return receipt requested to the City. In the event any of said policies of insurance are cancelled, the Consultant shall, prior to the cancellation date, submit new evidence of insurance in conformance with Section 5.1 to the Contract Officer.

No work or services under this Agreement shall commence until the Consultant has provided the City with Certificates of Insurance, additional insured endorsement forms or appropriate insurance binders evidencing the above insurance coverages and said Certificates of Insurance or binders are approved by the City. City reserves the right to inspect complete, certified copies of and endorsements to all required insurance policies at any time. Any failure to comply 01007.0001/644685.1 -8-
with the reporting or other provisions of the policies including breaches or warranties shall not affect coverage provided to City.

All certificates shall name the City as additional insured (providing the appropriate endorsement) and shall conform to the following <cancellation= notice:

CANCELLATION:

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE

CANCELLED BEFORE THE EXPIRATION DATED THEREOF,
THE ISSUING COMPANY SHALL MAIL THIRTY (30)-DAY

ADVANCE WRITTEN NOTICE TO CERTIFICATE HOLDER
NAMED HEREIN.
[to be initialed] CF
Consultant Initials
City, its respective elected and appointed officers, directors, officials, employees, agents and volunteers are to be covered as additional insureds as respects: liability arising out of activities Consultant performs; products and completed operations of Consultant; premises owned, occupied or used by Consultant; or any automobiles owned, leased, hired or borrowed by Consultant. The coverage shall contain no special limitations on the scope of protection afforded to City, and their respective elected and appointed officers, officials, employees or volunteers. Consultant9s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer9s liability.

Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City or its respective elected or appointed officers, officials, employees and volunteers or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration, defense expenses and claims. The Consultant agrees that the requirement to provide insurance shall not be construed as limiting in any way the extent to which the Consultant may be held responsible for the payment of damages to any persons or property resulting from the Consultant9s activities or the activities of any person or persons for which the Consultant is otherwise responsible nor shall it limit the Consultant9s indemnification liabilities as provided in Section 5.3.

In the event the Consultant subcontracts any portion of the work in compliance with Section 4.5 of this Agreement, the contract between the Consultant and such subcontractor shall require the subcontractor to maintain the same policies of insurance that the Consultant is required to maintain pursuant to Section 5.1, and such certificates and endorsements shall be provided to City.

5.3 Indemnification.

To the full extent permitted by law, Consultant agrees to indemnify, defend and hold harmless the City, its officers, employees and agents (<Indemnified Parties=) against, and will hold and save them and each of them harmless from, any and all actions, either judicial, administrative, 01007.000 1/644685.1 -9-
arbitration or regulatory claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities whether actual or threatened (herein <claims or liabilities=) that may be asserted or claimed by any person, firm or entity arising out of or in connection with the negligent performance of the work, operations or activities provided herein of Consultant, its officers, employees, agents, subcontractors, or invitees, or any individual or entity for which Consultant is legally liable (<indemnitors=), or arising from Consultant9s or indemnitors9 reckless or willful misconduct, or arising from Consultant9s or indemnitors9 negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, and in connection therewith:
(a) Consultant will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys9 fees incurred in connection therewith;
(b) Consultant will promptly pay any judgment rendered against the City, its officers, agents or employees for any such claims or liabilities arising out of or in connection with the negligent performance of or failure to perform such work, operations or activities of Consultant hereunder; and Consultant agrees to save and hold the City, its officers, agents, and employees harmless therefrom;
(c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Consultant for such damages or other claims arising out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Consultant hereunder, Consultant agrees to pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys9 fees.

Consultant shall incorporate similar indemnity agreements with its subcontractors and if it fails to do so Consultant shall be fully responsible to indemnify City hereunder therefore, and failure of City to monitor compliance with these provisions shall not be a waiver hereof. This indemnification includes claims or liabilities arising from any negligent or wrongful act, error or omission, or reckless or willful misconduct of Consultant in the performance of professional services hereunder. The provisions of this Section do not apply to claims or liabilities occurring as a result of City9s sole negligence or willful acts or omissions, but, to the fullest extent permitted by law, shall apply to claims and liabilities resulting in part from City9s negligence, except that design professionals9 indemnity hereunder shall be limited to claims and liabilities arising out of the negligence, recklessness or willful misconduct of the design professional. The indemnity obligation shall be binding on successors and assigns of Consultant and shall survive termination of this Agreement.

5.4 Sufficiency of Insurer.

Insurance required by this Agreement shall be satisfactory only if issued by companies qualified to do business in California, rated <<A-= or better in the most recent edition of Best Rating Guide, The Key Rating Guide or in the Federal Register, and only if they are of a financial category Class VII or better, unless such requirements are waived by the Risk Manager of the City (<Risk 01007.0001/644685.1 -10-
Manager99) due to unique circumstances. If this Agreement continues for more than 3 years duration, or in the event the risk manager determines that the work or services to be performed under this Agreement creates an increased or decreased risk of loss to the City, the Consultant agrees that the minimum limits of the insurance policies may be changed accordingly upon receipt of written notice from the Risk Manager.

ARTICLE 6. RECORDS, REPORTS, AND RELEASE OF INFORMATION

6.1 Records.

Consultant shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies or other documents relating to the disbursements charged to City and services performed hereunder (the <books and records=), as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. Any and all such documents shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of three (3) years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required. In the event of dissolution of Consultant9s business, custody of the books and records may be given to City, and access shall be provided by Consultant9s successor in interest. Notwithstanding the above, the Consultant shall fully cooperate with the City in providing access to the books and records if a public records request is made and disclosure is required by law including but not limited to the California Public Records Act.

6.2 Reports.

Consultant shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require. Consultant hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Consultant agrees that if Consultant becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein or, if Consultant is providing design services, the cost of the project being designed, Consultant shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto and, if Consultant is providing design services, the estimated increased or decreased cost estimate for the project being designed.

6.3 Ownership of Documents.

All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (the <documents and materials=) prepared by Consultant, its employees, subcontractors and agents in the performance of this Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Consultant shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of 01007.0001/644685.1 -l1-
ownership use, reuse, or assignment of the documents and materials hereunder. Any use, reuse or assignment of such completed documents for other projects and/or use of uncompleted documents without specific written authorization by the Consultant will be at the City9s sole risk and without liability to Consultant, and Consultant9s guarantee and warranties shall not extend to such use, reuse or assignment. Consultant may retain copies of such documents for its own use. Consultant shall have the right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Consultant fails to secure such assignment, Consultant shall indemnify City for all damages resulting therefrom. Moreover, with respect to any documents and materials that may qualify as <works made for hire= as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed <works made for hire= for the City.

6.4 Confidentiality and Release of Information.
(a) All information gained or work product produced by Consultant in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Consultant. Consultant shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the Contract Officer.
(b) Consultant, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the Contract Officer or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered <voluntary= provided Consultant gives City notice of such court order or subpoena. (c) If Consultant, or any officer, employee, agent or subcontractor of Consultant, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Consultant for any damages, costs and fees, including attorneys fees, caused by or incurred as a result of Consultant9s conduct. (d) Consultant shall promptly notify City should Consultant, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed there under. City retains the right, but has no obligation, to represent Consultant or be present at any deposition, hearing or similar proceeding. Consultant agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Consultant. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response.

ARTICLE 7. ENFORCEMENT OF AGREEMENT AND TERMINATION
71 California Law.

This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions 01007.0001/644685.1 -]2-
concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other appropriate court in such county, and Consultant covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in the County of Los Angeles, State of California.

7.2 Disputes: Default.

In the event that Consultant is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Consultant for any work performed after the date of default. Instead, the City may give notice to Consultant of the default and the reasons for the default. The notice shall include the timeframe in which Consultant may cure the default.

This timeframe is presumptively thirty (30) days, but may be extended, though not reduced, if circumstances warrant. During the period of time that Consultant is in default, the City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, the City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Consultant does not cure the default, the City may take necessary steps to terminate this Agreement under this Article. Any failure on the part of the City to give notice of the Consultant9s default shall not be deemed to result in a waiver of the City9s legal rights or any rights arising out of any provision of this Agreement. 73 Retention of Funds.

Consultant hereby authorizes City to deduct from any amount payable to Consultant (whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City, and (ii) all amounts for which City may be liable to third parties, by reason of Consultant9s acts or omissions in performing or failing to perform Consultant9s obligation under this Agreement. In the event that any claim is made by a third party, the amount or validity of which is disputed by Consultant, or any indebtedness shall exist which shall appear to be the basis for a claim of lien, City may withhold from any payment due, without liability for interest because of such withholding, an amount sufficient to cover such claim. The failure of City to exercise such right to deduct or to withhold shall not, however, affect the obligations of the Consultant to insure, indemnify, and protect City as elsewhere provided herein.

7.4 Waiver.

Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision or a waiver of any subsequent breach or violation of any provision of this Agreement.

Acceptance by City of any work or services by Consultant shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver.

Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 01007.0001/644685.1 -13-
75 Rights and Remedies are Cumulative.

Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party.

7.6 Legal Action.

In addition to any other rights or remedies, either party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. Notwithstanding any contrary provision herein, Consultant shall file a statutory claim pursuant to Government Code Sections 905 et. seq. and 910 et. seq., in order to pursue a legal action under this Agreement.

7.7 Termination Prior to Expiration of Term.

This Section shall govern any termination of this Agreement except as specifically provided in the following Section for termination for cause. The City reserves the right to terminate this Agreement at any time, with or without cause, upon thirty (30) days9 written notice to Consultant, except that where termination is due to the fault of the Consultant, the period of notice may be such shorter time as may be determined by the Contract Officer. In addition, the Consultant reserves the right to terminate this Agreement at any time, with or without cause, upon sixty (60) days9 written notice to City, except that where termination is due to the fault of the City, the period of notice may be such shorter time as the Consultant may determine. Upon receipt of any notice of termination, Consultant shall immediately cease all services hereunder except such as may be specifically approved by the Contract Officer. Except where the Consultant has initiated termination, the Consultant shall be entitled to compensation for all services rendered prior to the effective date of the notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, except as provided in Section 7.3. In the event the Consultant has initiated termination, the Consultant shall be entitled to compensation only for the reasonable value of the work product actually produced hereunder. In the event of termination without cause pursuant to this Section, the terminating party need not provide the non-terminating party with the opportunity to cure pursuant to Section 7.2.

7.8 Termination for Default of Consultant.

If termination is due to the failure of the Consultant to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Consultant shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to the Consultant for the purpose of set-off or partial payment of the amounts owed the City as previously stated. 01007.0001/644685.1 -14-
79 Attorneys9 Fees.

If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney9s fees. Attorney9s fees shall include attorney9s fees on any appeal, and in addition a party entitled to attorney9s fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment.

ARTICLE 8. CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION

8.1 Non-liability of City Officers and Employees.

No officer or employee of the City shall be personally liable to the Consultant, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Consultant or to its successor, or for breach of any obligation of the terms of this Agreement.

8.2 Conflict of Interest.

Consultant covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Consultant9s performance of services under this Agreement. Consultant further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the Contract Officer. Consultant agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement.

No officer or employee of the City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which affects her/his financial interest or the financial interest of any corporation, partnership or association in which (s)he is, directly or indirectly, interested, in violation of any State statute or regulation. The Consultant warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement.

8.3 Covenant Against Discrimination.

Consultant covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class in the performance of this Agreement. Consultant shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry or other protected class. 01007.0001/644685.1 -15-

8.4 Unauthorized Aliens.

Consultant hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C.A. §§ 1101, et seg., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Consultant so employ such unauthorized aliens for the performance of work and/or services covered by this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Consultant hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys9 fees, incurred by City.

ARTICLE 9. MISCELLANEOUS PROVISIONS

9.1 Notices.

Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the attention of the Contract Officer (with her/his name and City title), City of Carson, 701 East Carson, Carson, California 90745 and in the case of the Consultant, to the person(s) at the address designated on the execution page of this Agreement. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated at the time personally delivered or in seventy-two (72) hours from the time of mailing if mailed as provided in this Section.

9.2 Interpretation.

The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply.

9.3 Counterparts.

This Agreement may be executed in any number of counterparts and each of such counterparts shall for all purposes be deemed to be an original, whether the signatures are originals, electronic, facsimiles or digital. All such counterparts shall together constitute but one and the same Agreement.

9.4 Integration: Amendment.

This Agreement including the attachments hereto is the entire, complete and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by the Consultant and by the City Council. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void.
01007.0001/644685.1 -16-

9.5 Severability.

In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless.

9.6 Warranty & Representation of Non-Collusion.

No official, officer, or employee of City has any financial interest, direct or indirect, in this Agreement, nor shall any official, officer, or employee of City participate in any decision relating to this Agreement which may affect his/her financial interest or the financial interest of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any State or municipal statute or regulation. The determination of <financial interest= shall be consistent with State law and shall not include interests found to be <remote= or <non-interests= pursuant to Government Code Sections 1091 or 1091.5. Consultant warrants and represents that it has not paid or given, and will not pay or give, to any third party including, but not limited to, any City official, officer, or employee, any money, consideration, or other thing of value as a result or consequence of obtaining or being awarded any agreement.

Consultant further warrants and represents that (s)he/it has not engaged in any act(s), omission(s), or other conduct or collusion that would result in the payment of any money, consideration, or other thing of value to any third party including, but not limited to, any City official, officer, or employee, as a result of consequence of obtaining or being awarded any agreement. Consultant is aware of and understands that any such act(s), omission(s) or other conduct resulting in such payment of money, consideration, or other thing of value will render this Agreement void and of no force or effect.

CF
Consultant9s Authorized Initials

9.7 Corporate Authority.

The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE]
01007.0001/644685.1 -17-
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first-above written.

CITY:

CITY OF CARSON, a municipal corporation
D) ene Wilms)
Tal Davis-Holmes, Mayor
ATTEST: Apo
MS
Dr. Khaleah K. Bradshaw, City Clerk
CONSULTANT:

Z & K CONSULTANTS, INC.
a California corporation
CWiiaXA aie
By:
8Name: CryStal Fraire, PE
Title: President
By: ao
Name: Zack Fagih, PE
Title: Vice President
Address: 17130 Van Buren Blvd., Suite 122
Riverside, California 92504
Two corporate officer signatures required when Consultant is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. CONSULTANT9S SIGNATURES

SHALL BE DULY NOTARIZED, AND APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS

MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONSULTANT9S BUSINESS ENTITY. 01007.0001/644685.1 -18-

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document.

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
On 2025 before me, , personally appeared , proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature:

OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

INDIVIDUAL

CORPORATE OFFICER

TITLE(S) TITLE OR TYPE OF DOCUMENT
PARTNER(S) [] LIMITED

GENERAL

ATTORNEY-IN-FACT

TRUSTEE(S) NUMBER OF PAGES

GUARDIAN/CONSERVATOR

OTHER OOOO
O
OF
SIGNER IS REPRESENTING: DATE OF DOCUMENT
(NAME OF PERSON(S) OR ENTITY(IES))

SIGNER(S) OTHER THAN NAMED ABOVE
01007.0001/644685.1

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document.

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
On 2025 before me, , personally appeared , proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature:

OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

INDIVIDUAL

CORPORATE OFFICER

TITLE(S) TITLE OR TYPE OF DOCUMENT
PARTNER(S) [] LIMITED
| GENERAL

ATTORNEY-IN-FACT

TRUSTEE(S) NUMBER OF PAGES

GUARDIAN/CONSERVATOR

OTHER OOOO
O
OO
SIGNER IS REPRESENTING: DATE OF DOCUMENT
(NAME OF PERSON(S) OR ENTITY(IES))

SIGNER(S) OTHER THAN NAMED ABOVE
01007.0001/644685.1
EXHIBIT <A=

SCOPE OF SERVICES
I. Consultant will perform the following Services:

The Carson Civic Center Redevelopment Project aims to reimagine and invigorate the Civic Center as a thriving, inclusive hub that captures the essence of Carson9s unique cultural heritage and vibrant community. This transformative initiative envisions a harmonious blend of residential, commercial, and cultural spaces designed to create a dynamic downtown atmosphere, drawing people in at all times of the day and night.

Through thoughtful urban design, sustainable planning, and a commitment to accessibility, the project will create a welcoming environment that celebrates Carson9s past while looking toward its future. This revitalized Civic Center will serve as the "heart" of Carson, fostering connections, supporting public events, and establishing a legacy of value and beauty for the community and region.

A. Create a Vibrant Civic Heart: Reinforce the Civic Center9s identity as the "heart" of Carson by celebrating its history and cultural heritage through thoughtful urban design and engaging programming.

Foster a Dynamic Downtown: Cultivate an energetic downtown environment that attracts both daytime and nighttime visitors. Develop a phased plan that optimally integrates a diverse mix of uses to promote a balanced, vibrant community space.

Utilize Complete Streets Approach: Enhance accessibility and connectivity by designing Carson Boulevard and surrounding streets with a complete streets approach, balancing pedestrian, cyclist, and vehicle needs. Integrate ample parking to support all Civic Center facilities.

Establish a Regional Hub for Events and the Arts: Position downtown Carson as a magnet for large-scale public events, with a regional arts and recreation center that complements the Carson Civic Center and attracts both locals and visitors.

Build a Landmark Resort Hotel: Develop a high-rise resort hotel on a prominent 4.3-acre site visible from the I-405 Freeway, establishing it as a key destination within the new Civic Center area.

Expand Residential and Cultural Facilities: Construct a multi-story mixed-use residential building, a performing arts center, and an interactive museum to enrich the civic and cultural offerings of the community.

Revitalize City Hall: Transform City Hall with a multi-story mixed-use building to enhance its functionality and integrate seamlessly with the surrounding urban landscape.

Enhance the Community/Event Center: Modernize the Carson Community and Event Center, including the addition of an amphitheater to support a range of public performances and gatherings.
*Tn connection with the above vision, the Consultant will perform tasks on Exhibit A2 01007.0001/644685.1 A-1
Scope of Work
The project consists of five (5) major tasks:

Task 1: Development of the Civic Center Specific Plan
Task 2: Programming of Civic Facilities
Task 3: Concept Architectural Design of Civic Facilities Task 4: Cost Estimation for Civic Facilities
Task 5: Preparation of CEQA Documentation
The specific plan and architectural concepts will be guided by the Gocument City of Carson Vision Plan, Carson Civic Center (dated May 2024), created by ZAK Consultants and Gruen Associates.

Across Tasks 1 through 5. key activities include:
® Kick-off Meeting: An initial project meeting with the Z&K Team, City of Carson representatives. the City Planning Director, and other relevant stakeholders identified by the City and ZAK This meeting will define the Specific Plan boundaries, establish the general project schedule, set up a biweekly virtual check-in schedule, outline communication protocols, clarify overarching project goals, and review any additional information requirements. e Biweekly Virtual Check-ins: Regular biweekly meetings to maintain project momentum and ensure alignment with project milestones.
e Public Engagement: Participation in up to two public outreach meetings organized by the City. along with two Planning Commission meetings and one formal presentation at a City Council meeting.

This comprehensive approach ensures transparent communication, efficient project management. and community involvement throughout each phase of the project.

Task 1: Development of the Civic Center Specific Pian
The specific plan for the City of Carson Civic Center will include the requirements per the California Government Code - Section 65451. Article 8. Specific Plans as raproduced below:
(a) A specific plan shall include a text and a diagram or diagrams which specify all of fhe following in detail:
(7) The distnbution, location, and extent of the uses of Jand, including open space, within the area covered by the plan.
(2) The proposed distribution, location, and extent and intensity of major components of public and private transportation, sewage, water, drainage. solid waste disposal, energy. and other essential facilities proposed fo be located within the area covered by the plan and needed fo support the land uses described in the plan. (3) Standards and cntena by which development will proceed, and standards for ifie conservation. development. and utilization of natural resources, where applicable. (4) A program of implementation measures including regulations, programs, public works projects, and financing measures necessary to carry out paragrapts (1). (2). and (3). (b) The specific plan shall include a statement of the relationship of the specific plan fo the general plan. 01007.0001/644685.1 A-2
Infrastructure | KPFF Consulting Engineers (KPFF) will deliver civil engineering services to support the Carson Civic Center Specific Flan, ensuring compliance with the 2009 California Govamment Code Section 65450-65457: Article 8, which governs Specific Plans. This work will focus om evaluating the capacity and impact of key infrastructure components4public sewage, water, and drainage facilities4related to the proposed Specific Plan project. KPFF understands that the Specific Plan is intended to align with the 2022 Carson 2040 General Plan and Draft Environmental Impact Report. Our team will perform a high4tevel assessment of the effects on public wet utilities (sewer. fire and domestic water, storm drain) specific to the planned area. This assessment is based on the assumption that existing utilities currently meet demand and will nol require upgrades or expansion. This approach will help the City of Carson advance its vision for the Civic Center while supporting sustainable infrastructure planning.

Economics | Land Econ Group (LEG) will conduct a comprehensive real estate market analysis for residential and hotel properties anticipated to be available for private development, which are expected to serve as significant revenue sources supporting the new civic center's public facilities. The analysis will provide historical market context and a forward-looking market outlook over the next tan years, covering the following key land uses and parcels:
e Approximately 150 Rental Apartments: This analysis will assess rental rates, rent per square foot, unit mix, unit sizes, vacancy trends, historical absorption, amenities, and both current and emerging market competition. e Major Hotel: The evaluation will focus on room rates, historical room revenue (including transient occupancy tax data), occupancy rates, hotel class, and the competitive landscape, examining both current and future competitors.

LEG will also provide an initial assessment of the museum and theater developments, focusing on potential land lease revenue and cost impacts, though a full market study for these facilities is not included in this scope. Additionally, LEG will estimate the land value and potential land lease revenue for the proposed hotel and apartment developments. The technical analysis will follow two tracks:
e Comparable Land Transactions: Identifying relevant comparable sales to establish baseline values. e Residual Value Approach: A deeper valuation method based on the project's draft concept plan, calculating land value to translate into a potential lease revenue stream. This revenue is typically a negotiated percentage of the land value, providing a steady income stream based on current market conditions.

This dual approach ensures a thorough assessment of potential land values and lease revenue to support strategic decision-making for the Civic Center redevelopment project.

Mobility/Transportation Analysis | Iteris will conduct a comprehensive transportation impact analysis for the Specific Plan, addressing both CEQA and non-CEQArequirements. The CEQA analysis will assess the project's impact on regional mobility, specifically evaluating Vehicle Miles Traveled (VMT), to ensure compliance with State guidelines. The non-CEOA analysis will focus on focal mobility impacts, examining intersection Levels of Service (LOS) in line with the City9s traffic impact study guidelines. In addition, Iteris will collaborate with the Z&K team to develop the mobility chapter of the Specific Plan, contributing insights to shape an integrated approach to transportation planning. The traffic analysis will incude collecting new traffic count data at up to six intersections and two roadway segments in the vicinity of the Specific Plan area, providing a robust data foundation for both CEQA and non-CEQA evaluations.

Draft Specific Plan | The Z&K Team will collaborate closely with the City to establish the content and framework for the Specific Plan. The Administrative Draft Specific Plan will encompass a land use plan, development standards, design guidelines, and a mobility plan to align with the City9s vision for the Civic Center area. The draft will undergo a thorough review by the City9s Planning, Economic Development, Recreation, and Public Works departments to incorporate feedback and secure preliminary approval. The plan will be Geveloped based on the following preliminary outline:

1.Cover e Relationship to the Carson 6.Site Development and Design

2. Table of Contents General Plan Standards

3. Introduction ¢ Interpretation e Appticability

4. Administration © Severability e Architectural standards « Establishment of Plan 5.Land Use and Zoning e Site Design Standards ¢ Purpose « Permitted Uses e Streetscape Design Standards e Vision, Goals, and Objectives ¢ Residential Density e Landscape Design standards ¢ Relationship to other Zoning « Floor Area Ratio ¢ Sustainable Design Standards Regulations « Haight e Parking Design Standards
Relationship to Previous Specific e Affordable Housing 7.Mobility Plan Plans © Parking &. Infrastructure Plan
__9.Implemertation
01007.0001/644685.1 A-3
The completed Draft Administrative Specific Plan will be submitted to the City for review, with the Z&K Team making fefinements as requested. Following this, we will present the Draft Specific Plan to the Planning Commission for their recommendation to the City Council. The presentation, conducted by City staff, will include graphic support proviced by the Z&K Team, who will attend the hearing (up to two staff members).

Subsequently, the 28K Team will support City staff in presenting the Draft Specific Plan to the City Council for approval and adoption. This version will incorporate revisions recommended by City staff in response to feedback from Planning Commissioners and the public during the Planning Commission meeting. Graphic content will be supported by Gruen Associates, who will also attend the hearing (up to two staff members). At the direction of City staff, the Z&K Team will prepare the Final Specific Plan, addressing any additional changes requested by the City Council, ensuring that the final document aligns with the City's vision and stakeholder feedback.

Task 2: Programming of Civic Facilities
In collaboration with the City of Carson, the Z&K Team will develop a comprehensive program outlining the space tequirements for civic facilities, including City Hall, a Performing Arts Center, modifications to the existing Events Center, and various site features. The programming of hotel, residential, and museum components will be managed separately by their respective developers.
e City Hall: The Z&K Team will begin by distributing a detailed questionnaire and spreadsheet to City departments and user groups. This form will guide respondents in assessing current space needs for staff, activities, and support areas, along with projected growth over a 20- to 30-year period. Following completion of the questionnaire, the Z&K Team will conduct a series of virtual meetings with each department or user group to clarify responses, address questions, and discuss potential options. The findings will be compiled into a program report documenting the process and outcames.
e Performing Arts Center: The Z&K Team and our theater consultant, Theater DNA, will meet with City representatives to explore the anticipated types of performances, venue character, and specific space needs for a 1,200-seat capacity facility. A detailed space list will be created based on input from the City, covering specific dimensions and requirements for each area, including heights and support spaces. 4, Performance Space Character narrative will also be prepared to Gocument the design and functional requirements of the performance and support spaces. Both the space list and narrative will be reviewed with City representatives to ensure alignment with their expectations. Any necessary updates will be made, culminating in a final program package that accurately reflects the City9s needs and vision for the facility.

Task 3: Concept Architectural Design of Civic Facilities Building on the foundational work from the Specific Plan and programming phase, the architectural concept designs will encompass the following Civic Center elements:

City Hall with Ground-Floer Retail
Performing Arts Center
Modifications to the Existing Events Center
Parking Facilities
Exterior Site Features. including the public plaza and covered walkway Streetscape Concepts along Carson Boulevard
The hotel, residential. and museum components of the Civic Center will be designed separately by their respective developers. The architectural concept design process will be iterative, involving development, review. and refinement of Gesigns in collaboration with the City to ensure alignment with project goals and feedback. Concept designs will evolve from the visions presented in Gruen9s earlier work on the Vision Plan, Carsan Civic Center (dated May 2024, prepared by 2&K Consultants and Gruen Associates) and Gruen's subsequent image studies for City Hall, titled Carson Civic Center Master Plan Allematives (dated August 27. 2024). The concept designs will convey the interior and exterior configurations of the Civic Center through:

Wlustrative Site Plan: A conceptual site plan showing the entire Civic Center, including landscaping elements.

Concept Floor Plans: Floor plans for each level of each building.

Illustrative Elevations: Elevation views of each building to showcase exterior design.

Building Sections: Relevant cross-sections of each structure to illustrate spatial relationships.

Digital JD Rendered Images: Visual renderings to communicate the design vision in three Gmensions. 01007.0001/644685.1 A-4
The focus of this phase will be architectural design, complemented by Theater DNA's performing arts expertise and Gruen Associates9 landscape architecture. This concept design effort will not extend to engineering disciplines or specialty consultants such as structural, mechanical, electrical, plumbing, civil engineering, acoustics, lighting. or vertical transportation.

Task 4: Estimation for Civic Faciliti
Leland Saylor Associates (LSA) will develop a comprehensive Construction Cost Report that provides conceptual cost estimates for each public facility and amenity outlined in the Specific Plan, including the City Hall, Performing Arts Center, Evant Center modifications, site features, and Carson Boulevard streetscape improvements. These cost estimates will be based on the completed Spacific Plan Report and Concept Architectural Designs, reflecting the level of programming and conceptual detail available at this stage.

The report will estimate approximate construction costs and will include separate suggested allowances for broader project expenses, such as soft costs. Additionally, escalation allowances will be integrated, aligning with the phased development strategy to be detailed in the final Specific Plan report. This approach ensures that the cost estimates account for anticipated project timing, providing the City with a realistic financial framework for project implementation.

Task 5: P . ECEQAD .

Tery A. Hayes Associates (TAHA) will follow these steps to complete the California Environmental Quality Act (CEQA) process and prepare an Terry A. Hayes Associates (TAHA) wail undertake the following steps to complete the CEQA process and prepare an Initial Study leading to the adoption of a Mitigated Negative Declaration (IS/MND) for the Carson Civic Center Specific Plan:
e Project Management & Site Reconnaissance: Throughout the environmental review process, TAHA wil join conference calls with the project team and City staff as needed. A field visit to the Specific Plan area and surrounding vicinity will be conducted to evaluate potential environmental impacts and review any pre-existing technical studies and reports relevant to the Specific Pian.
e Screencheck Draft IS/MND. Using existing information and technical studies for the Specific Pian, TAHA will develop a comprehensive Initial Study covering all 21 environmental topics defined by the CEQA Guidelines. Detailed responses will address each CEQA checklist question, and, where necessary. mitigation measures will be proposed to reduce significant impacts to less-than-significant levels. The Screencheck Draft IS/MND will be submitted to the City for review and feadback.
e Technical Analyses: TAHA9s in-house technical specialists will conduct air quality, greenhouse gas (GHG) emissions, and noise analyses tailored to the Specific Plan to address the relevant CEQA checklist areas. For transportation and utilities assessments, TAHA will incorporate findings from analyses previously prepared for the Specific Plan.
e Revisions and Draft IS/MND: TAHA will revise the IS/MND in response to City comments, with up to two review cycles anticipated prior to finalizing the document for public review. Upon City approval, the IS/MND wall be prepared for public distribution.
e Respond to Public Comments & Mitigation Monitoring and Reporting Program (MMRP): Following the public cdroulation period, TAHA will draft responses to any public comments received. Additionally, TAHA will prepare an MMRP for the Specific Plan, outlining the framework to ensure implementation of any required mitigation measures. e Notice of Determination (NOD) & Public Hearing: TAHA will prepare the NOD for the City to file with the Los Angeles County Clerk. TAHA will ee ee ee ee ie
any questions or concems from decision-makers regarding the environmental documentation This structured approach will ensure a thorough and transparent CEQA process, paving the way for responsible development aligned with environmental and community standards. 01007.0001/644685.1 A-5
City Responsibilities
To complete the scope of work, the Z&K Team and our subconsultants request the following materials from the City at the start of the project:

Survey and Relevant Plans, Policies, or Studies
¢ Accurrent, detailed, ground-edited digital ALTA and topographic survey. e Alist of all complete, current, and future capital improvement projects as listed in the 2022 Carson 2040 General Plan. ¢ Access to current or draft City plans, such as relevant Specific Pians, the Bicycle Master Plan, or any pertinent documents, studies, or reports.
eCity branding standards for documents and reports, along with sample documents or plans the City aims to emulate. « Relevant soils reports for the project vicinity.

Economic/Development Data
e Recent economic and market studies for projects around Carson Civic Center, including any available retail/commercial annual reports.
e Available demographic and economic data.

GIS and Land Use Data | GIS data/shapefiles for:
e GIS data/shapefiles for: e Parcels and property ownership ¢ Public and private parking areas, e Census Tracts e Publicly-owned parcels including surface lots and ¢ Building footprints e Recent and planned structures
¢ Curbs developments e Micromobility drop zones and
e General Plan land use e Vacant parcels and facilities bike share stations designations e Parks and open spaces e Transit network maps, schedules, e Specific Plan areas e Bikeways and stops (existing and e Citywide tand use information e Civic and institutional assets proposed) (Land Use Element and Housing (e.g., schools, hospitals, * Street network data (centerlines Element) churches, senior centers, and/or right-of-way) e Zoning libraries) e = Traffic Analysis Zones (TAZs)
wwe Sweeney
Infrastructure Data
e Complete digital record drawings of surrounding ulilities (sewer, water, storm drain) and major city-wide sewer trunk lines.
© Adirectory of key utility contacts.

Mobility/Transportation and Traffic Data
As-built plans of major roadways, including right-of-way and striping.

Data on existing and proposed bike infrastructure.

Public parking facilities and stall counts (Excel or PDF format).

Baseline land use data for VMT CEQA analysis.

Relevant traffic studies and Environmental Impact Reports (EIRs) from the past three years.

Current Traffic Impact Study Guidelines.

Historical traffic count data and vehicle counts at key intersections (within the last five years).

Pedestrian counts at key intersections (within the last five years).

Traffic collision data for the past three years, including raw data and any summaries from the Police Department.

Statewide traffic collision data.

Speed limits and speed survey results.

List of programmed roadway improvements.

Data on truck types and volumes on key roads.
eoeeee#ee#eeee#k?x#e#ee
These resources are essentia! to ensure a comprehensive, efficient, and effective execution of the Civic Center Specific Plan project.

I. As part of the Services, Consultant will prepare and deliver the following tangible work products to the City:

A. Draft Specific Plan
01007.0001/644685.1 A-6
BS
A
Fe
F.

Final Specific Plan
Civic facilities program
Concept architectural designs of civic facilities
Construction estimated cost report
CEQA documents
II. In addition to the requirements of Section 6.2, during performance of the Services, Consultant will keep the City appraised of the status of performance by delivering the following status reports:

As requested by the City9s Contract Officer.

IV. All work product is subject to review and acceptance by the City, and must be revised by the Consultant without additional charge to the City until found satisfactory and accepted by City.

V. Consultant will utilize the following personnel to accomplish the Services:

A. Amer Jakher, PE, Senior Project Manager
B. Brittany Duhn, PE, Project Manager
C. Gruen Associates, architecture and planning, landscape architecture, and renderings (subconsultant)
D. Iteris, Inc., traffic services (subconsultant)
E. KPFF Consulting Engineers, civil engineering services (subconsultant) F. Terry A. Hayes Associates Inc., environmental services (subconsultant) G. Land Econ Group, economic/finance services (subconsultant) H. Theatre DNA Creative, performing arts consultant services (subconsultant) I. Leland Saylor Associates, cost estimator services (subconsultant) 01007.0001/644685.1 A-7
EXHIBIT <B=

SPECIAL REQUIREMENTS
(Superseding Contract Boilerplate)
(additions shown in bold italics, deletions shown in strikethreugh font) I. Section 1.2 (Consultant9s Proposal) is hereby amended to read in its entirety as follows:
<1.2 Consultant9s Proposal.

The Scope of Service shall include the Consultant9s proposal titled <City of Carson Proposal for Carson Civic Center Specific Plan= dated November 21, 2024, scepe-of-workorbid which shall be incorporated herein by this reference as though fully set forth herein (the <Proposal=). In the event of any inconsistency between the terms of the suck Pproposal and this Agreement, the terms of this Agreement shall govern.=
II. Section 4.5 (Prohibition Against Subcontracting or Assignment) is hereby amended to read in its entirety as follows:
<4.5 Prohibition Against Subcontracting or Assignment
The experience, knowledge, capability and reputation of Consultant, its principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, with the exception of the subcontractors identified in the immediately following sentence, Consultant shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City. The subcontractors City has consented to are as follows:
i Gruen Associates, which will provide services for architecture and planning, landscape architecture, and renderings;
ii, _4Iteris, Inc. for traffic services;
ui. KPFF Consulting Engineers for civil engineering services; iv. Terry A. Hayes Associates Inc. for environmental services; v. Land Econ Group for economic/finance services;
vii Theatre DNA Creative for performing arts consultant services; and vii Leland Saylor Associates for cost estimator services.

In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty 01007.0001/644685.1 B-1
five percent (25%) of the present ownership and/or control of Consultant, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Consultant or any surety of Consultant of any liability hereunder without the express consent of City.=
01007.0001/644685.1 B-2
I.

Il.

EXHIBIT <C=

SCHEDULE OF COMPENSATION
Consultant shall perform the following tasks at the following rates:
(Task [Amount
Task 1. Development of the Civic Center Specific Plan $191,504.85 __| Task 2. Programming of Civic Facilities $44.280.00__|
Task 3. Concept Architectural Design of Civic Facilities $158,670.00__| Task 4. Cost Estimate $45,325.50 |
| Task 5. Preparation of CEQA Documentation $86.100.00
Total $525,800.35 |
The fees will be invoiced monthly based on the percentage of work completed for each task. The fee is not inclusive of reimbursable expenses such as document reproduction, millage, delivery services and other expenses incurred for the benefit of the project.

Reimbursable expenses will be invoiced at their cost to Consultant plus 10%.

Reimbursable expenses are not to exceed $24,199.65.

Within the budgeted amounts for each Task, and with the approval of the Contract Officer, funds may be shifted from one Task sub-budget to another so long as the Contract Sum is not exceeded per Section 2.1, unless Additional Services are approved per Section 1.8.

The City will compensate Consultant for the Services performed upon submission of a valid invoice. Each invoice is to include:

A. Line items for all personnel describing the work performed, the number of hours worked, and the hourly rate.

B. Line items for all materials and equipment properly charged to the Services.

C. Line items for all other approved reimbursable expenses claimed, with supporting documentation.

D. Line items for all approved subcontractor labor, supplies, equipment, materials, and travel properly charged to the Services.

The total compensation for the Services and reimbursable expenses shall not exceed $550,000.00 as provided in Section 2.1 of this Agreement. 01007.0001/644685.1 C-1
EXHIBIT <D=

SCHEDULE OF PERFORMANCE
I. Consultant shall perform all services timely in accordance with the following schedule:

The Z&K team will expedite completion of the scope of work within an eight-month (34 weeks) period as follows beginning with the notice to proceed and receipt of requested information.

Task Estimated Completion
Task 1. Development of the Civic Center Specific Plan End of Week 14 Task 2. Programming of Civic Facilities End of Week 8
Task 3. Concept Architectural Design of Civic Facilities End of Week 20 Task 4. Cost Estimate End of Week 25
Task 5. Preparation of CEQA Documentation End of Week 34 Please note that due to the expedited schedule any city feedback needs to be timely with a maximum 7-day review period.

Il. The Contract Officer may approve extensions for performance of the services in accordance with Section 3.2.
01007.0001/644685.1 D-1
4)
ACCORD
ne CERTIFICATE OF LIABILITY INSURANCE

MANOMURUGAN
DATE (MMIDDIYYYY) |
11/11/2024
Z&KCONS-01
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER GQnract Ashly James
te51 Nokh Tustin Aventie (A1GNo, exp: (623) 278-4358 [FA noy(623) 278-4358 Suite 500 Fuk ss. [email protected]
Santa Ana, CA 92705 INSURER(S) AFFORDING COVERAGE NAIC # INSURER A: Travelers Property Casualty Company of America |25674 INSURED iNsuRER B: HDI Global Specialty SE A1340J
Z & K Consultants, Inc. INSURER C: James River Insurance Company 12203 22295 Jessamine Way INSURER D:

Corona, CA 92883 INSURER E:

INSURER F :

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

INSR TYPE OF INSURANCE hoo we POLICY NUMBER (MMDDIYYYY) | (MMMDDIYYYY) LIMITS A | X | COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 | CLAIMS-MADE OCCUR X | xX [68020978123 5/18/2024 | 5/18/2025 | DAMAGE TORENTED {5 1,000,000 || MED EXP (Any one person) $ 5,000
|| PERSONAL & ADVINJURY__| $ 1,000,000
| GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 |__| POLICY SEO Loc PRODUCTS - COMP/OP AGG | $ 2,000,000 OTHER: $
A | AUTOMOBILE LIABILITY COMBINED SINGCELIMIT |. 1,000,000 X | ANY AUTO X | X |BA6W812054 5/18/2024 | 5/18/2025 | popity INJURY (Per person) | $ . | OWNED SCHEDULED ; AUTOS ONLY AUTOS BODILY INJURY (Per accident)| $ . PROPERTY DAMAGE = AlROS ONLY AUTOS ONLY | (Per accident) $ $
A | X | UMBRELLA LIAB | X | OCCUR EACH OCCURRENCE $ 5,000,000 EXCESS LIAB cLAImMs-MADE] X | X |CUP7W800864 5/18/2024 | 5/18/2025 AGGREGATE $ 5,000,000 pep | X | RETENTIONS 0 Prod Comp $ 5,000,000

PER OTH-
A I RORRRES RS URSIN Wl X | Sears |_| Be Aa PROPER ETORMAR NE RIRECITIINE X |UB9K77696A 5/18/2024 | 5/18/2025 | =) cacu accipeNT ; 1,000,000 OFFICER/MEMBER EXCLUDED? NIA 1,000,000
(Mandatory in NH) E.L. DISEASE - EA EMPLOYEE] $ mu<
If yes, describe under 1,000,000
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT | $ we B |E&O/Professional Lia FRL-H-P-PL-00003201-01 7/10/2024 | 7/10/2025 |See Description C |Excess Liability 00148570-1 7/10/2024 | 7/10/2025 |See Description DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is pases .

E&O/Professional Liability | Policy Number: FRL-H-P-PL-00003201-01 | Effective & Expiration Dates: 7/10/2024 - 7/10/2025 | Limits: General Aggregate: $ 2,000,000 Each Claim: $1,000,000 Deductible $5,000 each claim | Deductible Aggregate $15,000 | retroactive date: full prior acts Excess E&O/Professional Liability | Policy Number: 00148570-1 | Effective & Expiration Dates: 7/10/2024 - 7/10/2025 | Limits: Each Claim: $1,000,000. General Aggregate $1.000.000 | Retro Date: 9/26/2023
Certificate Holder Is named Additional Insured as respects to General Liability. This insurance is primary and non-contributory with any other insurance of the SEE ATTACHED ACORD 101

CERTIFICATE HOLDER CANCELLATION
City of Carson

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
701 E Carson Street INSURANCE APPROVED
Carson, CA 90745
RG
1/2/2025
|

AUTHORIZED REPRESENTATIVE
Done blomir
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

The ACORD name and logo are registered marks of ACORD
AGENCY CUSTOMER ID: 2&KCONS-01 MANOMURUGAN
4 Loc#: 1
ACORD ADDITIONAL REMARKS SCHEDULE Page 1 of 1

AGENCY NAMED INSURED
INFP Property & Casualty Services, Inc. 50595 Jeseamane Way= POLICY NUMBER Corona, CA 92883
SEE PAGE 1

CARRIER NAIC CODE
SEE PAGE 1 SEE P1 EFFECTIVE DATE: SEE PAGE 4

ADDITIONAL REMARKS

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: _ACORD 25 FORM TITLE: Certificate of Liability Insurance Description of Operations/Locations/Vehicles:
additional insured, so long as a written contract or agreement to such exists prior to a loss, per endorsements CG D3 79 02 19 and/or CG D3 81 09 15 & CG D3 81 09 15 attached. A Waiver of subrogation in favor of the certificate holder applies as respects to General Liability coverage, per endorsement CG D3 79 02 19 and/or CG D3 81 09 15 attached. General liability per-project aggregate applies per endorsement CG D4 02 06 19 attached.

Umbrella/Excess Liability underlying policies include General Liability, Employers Liability, Professional Liability & Automobile Liability per schedules EU 00 03 08 18 & PL0014US 12-20 attached.

Certificate Holder is named as Additional Insured as respects to Automobile Liability so long as a written contract or agreement to such exists with the named insured prior to a loss, per endorsement CA T4 20 02 15 attached. A Waiver of subrogation in favor of the certificate holder applies as respects to Automobile Liability coverage, per endorsement CA T4 20 02 15 attached.

A Waiver of subrogation in favor of the certificate holder applies as respects to Workers Compensation coverage, per endorsement CA T4 20 02 15 attached.

City of Carson, its respective elected and appointed officers, directors, officials, employees, agents and volunteers are named Additional Insureds as respects to General Liability, Umbrella Liability and Auto Liability. General Liability insurance is primary and non-contributory with any other insurance of the additional insureds, so long as a written contract or agreement to such exists prior to a loss. A Waiver of subrogation in favor of the additional insureds applies as respects to General Liability, Auto Liability, Umbrella Liability and Workers Compensation coverage so long as written contract or agreement exists as per attached endorsement CG D3 79 02 19 and/or CG D3 81 09 15, CA T4 20 02 15 and WC 99 03 76 (A)-001. Umbrella Liability Follow Form.

ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved.

The ACORD name and logo are registered marks of ACORD
CG D3 81 09 15

COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

BLANKET ADDITIONAL INSURED
(ARCHITECTS, ENGINEERS AND SURVEYORS)
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART
The following is added to SECTION II 4 WHO IS
AN INSURED:

Any person or organization that you agree in a
"written contract requiring insurance" to include as
an additional insured on this Coverage Part, but:
a. Only with respect to liability for "bodily injury",
"property damage" or "personal injury"; and
b. If, and only to the extent that, the injury or
damage is caused by acts or omissions of
you or your subcontractor in the performance
of "your work" to which the "written contract
requiring insurance" applies, or in connection
with premises owned by or rented to you.

The person or organization does not qualify as an
additional insured:
c. With respect to the independent acts or
omissions of such person or organization; or
d. For "bodily injury", "property damage" or
"personal injury" for which such person or
organization has assumed liability in a
contract or agreement.

The insurance provided to such additional insured
is limited as follows:
e. This insurance does not apply on any basis to
any person or organization for which
coverage as an additional insured specifically
is added by another endorsement to this
Coverage Part.
f. This insurance does not apply to the
rendering of or failure to render any
"professional services".
g. Inthe event that the Limits of Insurance of the
Coverage Part shown in the Declarations
exceed the limits of liability required by the
"written contract requiring insurance", the
insurance provided to the additional insured
shall be limited to the limits of liability required
by that "written contract requiring insurance".

This endorsement does not increase the
limits of insurance described in Section Ill 4
Limits Of Insurance.
© 2015 The Travelers Indemnity Company. All rights reserved. h. This insurance does not apply to "bodily
injury" or <property damage" caused by "your
work" and included in the "products-
completed operations hazard" unless the
"written contract requiring insurance"
specifically requires you to provide such
coverage for that additional insured, and then
the insurance provided to the additional
insured applies only to such "bodily injury" or
"property damage" that occurs before the end
of the period of time for which the "written
contract requiring insurance" requires you to
provide such coverage or the end of the
policy period, whichever is earlier.

The following is added to Paragraph 4.a. of
SECTION IV -4 COMMERCIAL GENERAL
LIABILITY CONDITIONS:

The insurance provided to the additional insured
is excess over any valid and collectible other
insurance, whether primary, excess, contingent or
on any other basis, that is available to the
additional insured for a loss we cover. However, if
you specifically agree in the "written contract
requiring insurance" that this insurance provided
to the additional insured under this Coverage Part
must apply on a primary basis or a primary and
non-contributory basis, this insurance is primary
to other insurance available to the additional
insured which covers that person or organizations
as a named insured for such loss, and we will not
share with the other insurance, provided that:
(1) The "bodily injury" or "property damage" for
which coverage is sought occurs; and
(2) The "personal injury" for which coverage is
sought arises out of an offense committed;
after you have signed that "written contract
requiring insurance". But this insurance provided
to the additional insured still is excess over valid
and collectible other insurance, whether primary,
excess, contingent or on any other basis, that is
available to the additional insured when that
person or organization is an additional insured
under any other insurance.

Page 1 of 2 ends

Includes the copyrighted material of Insurance Services Office, Inc., with its permission

Page 2 of 2 ends

COMMERCIAL GENERAL LIABILITY
The following is added to Paragraph 8., Transfer
Of Rights Of Recovery Against Others To Us,
of SECTION IV 4 COMMERCIAL GENERAL
LIABILITY CONDITIONS:

We waive any right of recovery we may have
against any person or organization because of
payments we make for "bodily injury", "property
damage" or "personal injury" arising out of "your
work" performed by you, or on your behalf, done
under a "written contract requiring insurance" with
that person or organization. We waive this right
only where you have agreed to do so as part of
the "written contract requiring insurance" with
such person or organization signed by you
before, and in effect when, the "bodily injury" or
"property damage" occurs, or the "personal injury"
offense is committed.
© 2015 The Travelers Indemnity Company. All rights reserved.

The following definition is added to the
DEFINITIONS Section:
"Written contract requiring insurance" means that
part of any written contract under which you are
required to include a person or organization as an
additional insured on this Coverage Part,
provided that the "bodily injury" and "property
damage" occurs and the "personal injury" is
caused by an offense committed:
a. After you have signed that written contract;
b. While that part of the written contract is in
effect; and
c. Before the end of the policy period.

CG D3 81 09 15
Includes the copyrighted material of Insurance Services Office, Inc., with its permission

COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

XTEND ENDORSEMENT FOR ARCHITECTS, ENGINEERS

AND SURVEYORS
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART
GENERAL DESCRIPTION OF COVERAGE - This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to this Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general coverage description only. Read all the provisions of this endorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered.

A. Non-Owned Watercraft 4 75 Feet Long Or Less
B. Who Is An Insured 4 Unnamed Subsidiaries
C. Who Is An Insured 4 Retired Partners, Members,
Directors And Employees
D. Who Is An Insured 4 Employees And Volunteer
Workers 4 Bodily Injury To Co-Employees, Co-
Volunteer Workers And _ Retired Partners,
Members, Directors And Employees
E. Who Is An Insured 4 Newly Acquired Or Formed
Limited Liability Companies
F. Blanket Additional Insured 4 Controlling Interest
G. Blanket Additional Insured -4 Mortgagees,
Assignees, Successors Or Receivers

PROVISIONS
A. NON-OWNED WATERCRAFT 4- 75 FEET
CG D3 79 02 19

LONG OR LESS

1. The following replaces Paragraph (2) of
Exclusion g., Aircraft, Auto Or Watercraft,
in Paragraph 2. of SECTION I 4-
COVERAGES 4 COVERAGE A - BODILY

INJURY AND PROPERTY DAMAGE
LIABILITY:
(2) A watercraft you do not own that is:
(a) 75 feet long or less; and
(b) Not being used to carry any person
or property for a charge;

2. The following replaces Paragraph 2.e. of
SECTION II 4 WHO IS AN INSURED:
e. Any person or organization that, with
your express or implied consent, either
H. +
© 2017 The Travelers Indemnity Company. All rights reserved.

Blanket Additional Insured 4 Governmental
Entities 4 Permits Or Authorizations Relating To
Premises
Blanket Additional Insured 4 Governmental
Entities 4 Permits Or Authorizations Relating To
Operations
Incidental Medical Malpractice
Medical Payments 4 Increased Limit
Amendment Of Excess Insurance Condition 4
Professional Liability
Blanket Waiver Of Subrogation 4 When Required
By Written Contract Or Agreement
Contractual Liability 4 Railroads
uses or is responsible for the use of a
watercraft that you do not own that is:
(1) 75 feet long or less; and
(2) Not being used to carry any person
or property for a charge;

WHO IS AN INSURED -

SUBSIDIARIES
The following is added to SECTION II - WHO IS
AN INSURED:

Any of your subsidiaries, other than a partnership
or joint venture, that is not shown as a Named
Insured in the Declarations is a Named Insured
if:
a. You are the sole owner of, or maintain an
ownership interest of more than 50% in, such
subsidiary on the first day of the policy
period; and

UNNAMED

Page 1 of 6 ends

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

Page 2 of 6 ends

COMMERCIAL GENERAL LIABILITY
b. Such subsidiary is not an insured under
similar other insurance.

No such subsidiary is an insured for "bodily
injury" or "property damage" that occurred, or
"personal and advertising injury" caused by an
offense committed:
a. Before you maintained an ownership interest
of more than 50% in such subsidiary; or
b. After the date, if any, during the policy period
that you no longer maintain an ownership
interest of more than 50% in such subsidiary.

For purposes of Paragraph 1. of Section Il 4 Who
Is An Insured, each such subsidiary will be
deemed to be designated in the Declarations as:
a. A limited liability company;
b. An organization other than a_ partnership,
Joint venture or limited liability company; or
c. A trust;
as indicated in its name or the documents that
govern its structure.
. WHOIS AN INSURED 4 RETIRED PARTNERS,

MEMBERS, DIRECTORS AND EMPLOYEES
The following is added to Paragraph 2. of
SECTION II 4 WHO IS AN INSURED:

Any person who is your retired partner, member,
director or "employee" that is performing services
for you under your direct supervision, but only for
acts within the scope of their employment by you
or while performing duties related to the conduct
of your business. However, no such retired
partner, member, director or "employee" is an
insured for:
(1) "Bodily injury":
(a) To you, to your current partners or
members (if you are a partnership or
joint venture), to your current members
(if you are a limited liability company) or
to your current directors;
(b) To the spouse, child, parent, brother or
sister of that current partner, member or
director as a consequence of Paragraph
(1)(a) above;
(c) For which there is any obligation to
share damages with or repay someone
else who must pay damages because of
the injury described in Paragraph (1)(a)
or (b) above; or
(d) Arising out of his or her providing or
failing to provide professional health care
services.
(2)
(3)
© 2017 The Travelers Indemnity Company. All rights reserved.

Unless you are in the business or occupation
of providing professional health care
services, Paragraphs (1)(a), (b), (c) and (d)
above do not apply to "bodily injury" arising
out of providing or failing to provide first aid
or "Good Samaritan services" by any of your
retired partners, members, directors or
"employees", other than a doctor. Any such
retired partners, members, directors or
"employees" providing or failing to provide
first aid or "Good Samaritan services" during
their work hours for you will be deemed to be
acting within the scope of their employment
by you or performing duties related to the
conduct of your business.
"Personal injury":
(a) To you, to your current or retired
partners or members (if you are a
partnership or joint venture), to your
current or retired members (if you are a
limited liability company), to your other
current or retired directors or
"employees" while in the course of his or
her employment or performing duties
related to the conduct of your business,
or to your other "volunteer workers"
while performing duties related to the
conduct of your business;
(b) To the spouse, child, parent, brother or
sister of that current or retired partner,
member, director, "employee" or
"volunteer worker" as a consequence of
Paragraph (2)(a) above;
(c) For which there is any obligation to
share damages with or repay someone
else who must pay damages because of
the injury described in Paragraph (2)(a)
or (b) above; or
(d) Arising out of his or her providing or
failing to provide professional health care
services.
"Property damage" to property:
(a) Owned, occupied or used by; or
(b) Rented to, in the care, custody or control
of, or over which physical control is
being exercised for any purpose by;
you, any of your retired partners, members
or directors, your current or retired
"employees" or "volunteer workers", any
current partner or member (if you are a
partnership or joint venture), or any current
member (if you are a_ limited liability
company) or current director.

CG D3 79 02 19
Includes copyrighted material of Insurance Services Office, Inc. with its permission.

CG D3 79 02 19
D. WHO IS AN INSURED -4 EMPLOYEES AND

VOLUNTEER WORKERS - BODILY INJURY

TO CO-EMPLOYEES, CO-VOLUNTEER

WORKERS AND RETIRED PARTNERS,

MEMBERS, DIRECTORS AND EMPLOYEES
The following is added to Paragraph 2.a.(1) of
SECTION II 4 WHO IS AN INSURED:

Paragraphs (1)(a), (b) and (c) above do not
apply to "bodily injury" to a current or retired co-
"employee" while in the course of the co-
"employee's" employment by you or performing
duties related to the conduct of your business, or
to "bodily injury" to your other "volunteer
workers" or retired partners, members or
directors while performing duties related to the
conduct of your business.

WHO IS AN INSURED 4 NEWLY ACQUIRED

OR FORMED LIMITED LIABILITY COMPANIES
The following replaces Paragraph 3. of
SECTION II 4 WHO IS AN INSURED:

3. Any organization you newly acquire or form,
other than a partnership or joint venture, and
of which you are the sole owner or in which
you maintain an ownership interest of more
than 50%, will qualify as a Named Insured if
there is no other similar insurance available
to that organization. However:
a. Coverage under this provision is
afforded only:
(1) Until the 180th day after you acquire
or form the organization or the end of
the policy period, whichever is
earlier, if you do not report such
organization in writing to us within
180 days after you acquire or form it;
or
(2) Until the end of the policy period,
when that date is later than 180 days
after you acquire or form such
organization, if you report such
organization in writing to us within
180 days after you acquire or form it;
b. Coverage A does not apply to "bodily
injury" or "property damage" that
occurred before you acquired or formed
the organization; and
c. Coverage B does not apply to "personal
and advertising injury" arising out of an
offense committed before you acquired
or formed the organization.

For the purposes of Paragraph 1. of Section
Il 4 Who Is An Insured, each such
F. BLANKET ADDITIONAL
G. BLANKET ADDITIONAL
© 2017 The Travelers Indemnity Company. All rights reserved.

COMMERCIAL GENERAL LIABILITY
organization will be deemed to be
designated in the Declarations as:
a. A limited liability company;
b. An organization other than a partnership,
joint venture or limited liability company;
or
c. A trust;
as indicated in its name or the documents
that govern its structure.

INSURED -

CONTROLLING INTEREST

1. The following is added to SECTION II 4
WHO IS AN INSURED:

Any person or organization that has financial
control of you is an insured with respect to
liability for "bodily injury", "property damage"
or "personal and advertising injury" that
arises out of:
a. Such financial control; or
b. Such person's9 or _ organization's
ownership, maintenance or use of
premises leased to or occupied by you.

The insurance provided to such person or
organization does not apply to structural
alterations, new construction or demolition
operations performed by or on behalf of such
person or organization.

2. The following is added to Paragraph 4. of
SECTIO N Il 4 WHO IS AN INSURED:

This paragraph does not apply to any
premises owner, manager or lessor that has
financial control of you.

INSURED -

MORTGAGEES, ASSIGNEES, SUCCESSORS

OR RECEIVERS
The following is added to SECTION II 4 WHO IS
AN INSURED:

Any person or organization that is a mortgagee,
assignee, successor or receiver and that you
have agreed in a written contract or agreement
to include as an additional insured on this
Coverage Part is an insured, but only with
respect to its liability as mortgagee, assignee,
successor or receiver for "bodily injury", "property
damage" or "personal and advertising injury"
that:
a. Is "bodily injury" or "property damage" that
occurs, or is "personal and advertising injury"
caused by an offense that is committed,

Page 3 of 6 ends

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

COMMERCIAL GENERAL LIABILITY
subsequent to the signing of that contract or
agreement; and
b. Arises out of the ownership, maintenance or
use of the premises for which that
mortgagee, assignee, successor or receiver
is required under that contract or agreement
to be included as an additional insured on
this Coverage Part.

The insurance provided to such mortgagee,
assignee, successor or receiver is subject to the
following provisions:
a. The limits of insurance provided to such
mortgagee, assignee, successor or receiver
will be the minimum limits that you agreed to
provide in the written contract or agreement,
or the limits shown in the Declarations,
whichever are less.
b. The insurance provided to such person or
organization does not apply to:
(1) Any "bodily injury" or "property damage"
that occurs, or any "personal and
advertising injury" caused by an offense
that is committed, after such contract or
agreement is no longer in effect; or
(2) Any "bodily injury", "property damage" or
"personal and advertising injury" arising
out of any structural alterations, new
construction or demolition operations
performed by or on behalf of such
mortgagee, assignee, successor or
receiver.

BLANKET ADDITIONAL INSURED -
GOVERNMENTAL ENTITIES 4 PERMITS OR

AUTHORIZATIONS RELATING TO PREMISES
The following is added to SECTION II 4 WHO IS
AN INSURED:

Any governmental entity that has issued a permit
or authorization with respect to premises owned
or occupied by, or rented or loaned to, you and
that you are required by any ordinance, law,
building code or written contract or agreement to
include as an additional insured on_ this
Coverage Part is an insured, but only with
respect to liability for "bodily injury", "property
damage" or "personal and advertising injury"
arising out of the existence, ownership, use,
maintenance, repair, construction, erection or
removal of any of the following for which that
governmental entity has issued such permit or
authorization: advertising signs, awnings,
canopies, cellar entrances, coal holes,
driveways, manholes, marquees, hoist away
openings, sidewalk vaults, elevators, street
banners or decorations.

BLANKET ADDITIONAL INSURED -
GOVERNMENTAL ENTITIES 4- PERMITS

OR AUTHORIZATIONS RELATING TO

OPERATIONS
The following is added to SECTION II 4 WHO IS
AN INSURED:

Any governmental entity that has issued a permit
or authorization with respect to operations
performed by you or on your behalf and that you
are required by any ordinance, law, building code
or written contract or agreement to include as an
additional insured on this Coverage Part is an
insured, but only with respect to liability for
"bodily injury", "property damage" or "personal
and advertising injury" arising out of such
operations.

The insurance provided to such governmental
entity does not apply to:
a. Any "bodily injury", "property damage" or
"personal and advertising injury" arising out
of operations performed for the
governmental entity; or
b. Any "bodily injury" or "property damage"
included in the <"products-completed
operations hazard".

INCIDENTAL MEDICAL MALPRACTICE

1. The following replaces Paragraph b. of the
definition of "occurrence" in the
DEFINITIONS Section:
b. An act or omission committed in
providing or failing to provide "incidental
medical services", first aid or "Good
Samaritan services" to a person, unless
you are in the business or occupation of
providing professional health care
services.

2. The following replaces the last paragraph of
Paragraph 2.a.(1) of SECTION II 4 WHO IS
AN INSURED:

Unless you are in the business or occupation
of providing professional health care
services, Paragraphs (1)(a), (b), (c) and (d)
above do not apply to "bodily injury" arising
out of providing or failing to provide:
(a) "Incidental medical services" by any of
your "employees" who is a_ nurse,
nurse assistant, emergency medical
technician, paramedic, athletic trainer,
audiologist, dietician, nutritionist,

Page 4 of 6 ends

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

CG D3 79 02 19
CG D3 79 02 19
occupational therapist or occupational
therapy assistant, physical therapist or
speech-language pathologist; or
(b) First aid or "Good Samaritan services"
by any of your "employees" or "volunteer
workers", other than an employed or
volunteer doctor. Any such "employees"
or "volunteer workers" providing or failing
to provide first aid or "Good Samaritan
services" during their work hours for you
will be deemed to be acting within the
scope of their employment by you or
performing duties related to the conduct
of your business.

3. The following replaces the last sentence of
Paragraph 5. of SECTION Ill 4 LIMITS OF
INSURANCE:

For the purposes of determining the
applicable Each Occurrence Limit, all related
acts or omissions committed in providing or
failing to provide "incidental medical
services", first aid or "Good Samaritan
services" to any one person will be deemed
to be one "occurrence".

4. The following exclusion is added to
Paragraph 2., Exclusions, of SECTION I 4
COVERAGES 4 COVERAGE A 4 BODILY
INJURY. AND PROPERTY DAMAGE
LIABILITY:

Sale Of Pharmaceuticals
"Bodily injury" or "property damage" arising
out of the violation of a penal statute or
ordinance relating to the sale of
pharmaceuticals committed by, or with the
knowledge or consent of the insured.

5. The following is added to the DEFINITIONS
Section:
"Incidental medical services" means:
a. Medical, surgical, dental, laboratory, x-
ray or nursing service or treatment,
advice or instruction, or the related
furnishing of food or beverages; or
b. The furnishing or dispensing of drugs or
medical, dental, or surgical supplies or
appliances.

6. The following is added to Paragraph 4.b.,
Excess Insurance, of SECTION IV -

COMMERCIAL GENERAL LIABILITY
CONDITIONS:

This insurance is excess over any valid and
collectible other insurance, whether primary,
excess, contingent or on any other basis,
© 2017 The Travelers Indemnity Company. All rights reserved.

COMMERCIAL GENERAL LIABILITY
that is available to any of your "employees"
for "bodily injury" that arises out of providing
or failing to provide "incidental medical
services" to any person to the extent not
subject to Paragraph 2.a.(1) of Section Il 4
Who Is An Insured.

K. MEDICAL PAYMENTS 4 INCREASED LIMIT
The following replaces Paragraph 7. of
SECTION III 4 LIMITS OF INSURANCE:

7. Subject to Paragraph 5. above, the Medical
Expense Limit is the most we will pay under
Coverage C for all medical expenses
because of "bodily injury" sustained by any
one person, and will be the higher of:
a. $10,000; or
b. The amount shown in the Declarations of
this Coverage Part for Medical Expense
Limit.

AMENDMENT OF EXCESS_ INSURANCE
CONDITION 4 PROFESSIONAL LIABILITY
The following is added to Paragraph 4.b.,
Excess Insurance, of SECTION IV 4

COMMERCIAL GENERAL LIABILITY
CONDITIONS:

This insurance is excess over any of the other
insurance, whether primary, excess, contingent
or on any other basis, that is Professional
Liability or similar coverage, to the extent the
loss is not subject to the professional services
exclusion of Coverage A or Coverage B.
. BLANKET WAIVER OF SUBROGATION -

WHEN REQUIRED BY WRITTEN CONTRACT

OR AGREEMENT
The following is added to Paragraph 8., Transfer
Of Rights Of Recovery Against Others To Us,
of SECTION IV 4 COMMERCIAL GENERAL
LIABILITY CONDITIONS:

If the insured has agreed in a written contract or
agreement to waive that insured's right of
recovery against any person or organization, we
waive our right of recovery against such person
or organization, but only for payments we make
because of:
a. "Bodily injury" or "property damage" that
occurs; or
b. "Personal and advertising injury" caused by
an offense that is committed;
subsequent to the signing of that contract or
agreement.

Page 5 of 6 ends

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

COMMERCIAL GENERAL LIABILITY
N. CONTRACTUAL LIABILITY 4 RAILROADS

1. The following replaces Paragraph c. of the
definition of 8insured contract" in the
DEFINITIONS Section:
c. Any easement or license agreement;

2. Paragraph f.(1) of the definition of "insured
contract" in the DEFINITIONS Section is
deleted.

Page 6 of 6 ends

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

COMMERCIAL GENERAL LIABILITY
POLICY NUMBER: 680-23978123-24-47 ISSUE DATE: 05/06/2024 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

TOTAL AGGREGATE LIMIT OTHER THAN PROJECTS

AND DESIGNATED PROJECT AND LOCATION

AGGREGATE LIMITS
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE 4 LIMITS OF INSURANCE AND DESIGNATED PROJECTS AND LOCATIONS

LIMITS OF INSURANCE
Total Aggregate Limit $ 2,000,000
(Other Than Projects and Products-Completed Operations) Designated Location Aggregate Limit $ 2,000,000
(Other Than Products-Completed Operations)
Designated Project Aggregate Limit $ 2,000,000
(Other Than Products-Completed Operations)
General Aggregate Limit $ 2,000,000
(Other Than Products-Completed Operations)
Designated Projects:

Each "project" for which you have agreed, in a written contract which is in effect during this policy period, to provide a separate General Aggregate Limit, provided that the contract is signed by you before the "bodily injury" or "property damage" occurs.

Designated Locations:

All locations listed in Item 3. of the Common Policy Declarations or in any Master Pac Account Exposure Endorsement included in this policy.

PROVISIONS

1. The General Aggregate Limit (Other Than 1. The Limits of Insurance shown in the Products-Completed Operations) shown in the Declarations or the Schedule 4 Limits Of Declarations is replaced by the Limits of Insurance And Designated Projects And Insurance shown in the Schedule 4 Limits Of Locations, whichever apply, and the rules Insurance And _ Designated Projects And below fix the most we will pay regardless of Locations. the number of:

2. The following replaces Paragraph 1. of SECTION a. Insureds; Ill4 LIMITS OF INSURANCE: b. Claims made or "suits" brought; CG D4 69 02 19 © 2017 The Travelers Indemnity Company. All rights reserved. Page 1 of 3 Includes copyrighted material of Insurance Services Office, Inc. with its permission.

COMMERCIAL GENERAL LIABILITY
c.
d.

Persons or organizations making claims
or bringing "suits"; or
"Projects" or "locations".

3. The following replaces Paragraph 2. of SECTION
Ill 4 LIMITS OF INSURANCE:

2. a.
b.

Page 2 of 3 ends

The Total Aggregate Limit shown in the
Schedule 4 Limits Of Insurance And
Designated Projects And Locations is the
most we will pay for the sum of all
amounts under the Designated Location
Aggregate Limit and all amounts under
the General Aggregate Limit. This
includes:
(1) Damages under Coverage A, except
damages because of "bodily injury" or
"property damage" included in
the "products-completed operations
hazard";
(2) Damages under Coverage B; and
(3) Medical expenses under Coverage C.

The Designated Project Aggregate Limit
shown in the Schedule 4 Limits Of
Insurance And Designated Projects And
Locations applies and is further subject to
all of the following provisions:
(1) The Designated Project Aggregate
Limit is the most we will pay for the
sum of:
(a) Damages under Coverage A
because of "bodily injury" and
"property damage" caused by
"occurrences"; and
(b) Medical expenses under
Coverage C for "bodily injury"
caused by accidents;
that can be attributed only to
operations at a single "project".
(2) The Designated Project Aggregate
Limit applies separately to each
"project".
(3) The Designated Project Aggregate
Limit does not apply to damages
because of "bodily injury" or "property
damage" included in the "products-
completed operations hazard".

Instead, the Products-Completed
Operations Aggregate Limit
described in Paragraph 3. below
applies to such damages.
(4) The Designated Project Aggregate
Limit does not apply to damages
© 2017 The Travelers Indemnity Company. All rights reserved. c.
under Coverage B. Instead, the
General Aggregate Limit described in
Paragraph 2.d. below applies to such
damages.
(5) Any payments made for damages or
medical expenses to which the
Designated Project Aggregate Limit
applies will reduce the Designated
Project Aggregate Limit for the
applicable "project". Such payments
will not reduce the Total Aggregate
Limit, the General Aggregate Limit
described in Paragraph 2.d. below,
the Designated Project Aggregate
Limit for any other "project" or the
Designated Location Aggregate Limit.

Subject to the Total Aggregate Limit
described in Paragraph 2.a. above, the
Designated Location Aggregate Limit
shown in the Schedule 4 Limits Of
Insurance And Designated Projects And
Locations applies and is further subject to
all of the following provisions:
(1) The Designated Location Aggregate
Limit is the most we will pay for the
sum of:
(a) Damages under Coverage A
because of "bodily injury" and
"property damage" caused by
"occurrences"; and
(b) Medical expenses under
Coverage C for "bodily injury"
caused by accidents;
that can be attributed only to
operations at a single "location".
(2) The Designated Location Aggregate
Limit applies separately to each
"location".
(3) The Designated Location Aggregate
Limit does not apply to damages
because of "bodily injury" or "property
damage" included in the "products-
completed operations hazard".

Instead, the Products-Completed
Operations Aggregate Limit
described in Paragraph 3. below
applies to such damages.
(4) The Designated Location Aggregate
Limit does not apply to damages
under Coverage B. Instead, the
General Aggregate Limit described in
CG D4 69 02 19
Includes copyrighted material of Insurance Services Office, Inc. with its permission.

Paragraph 2.d. below applies to such
damages.
(5) Any payments made for damages or
medical expenses to which the
Designated Location Aggregate Limit
applies will reduce:
(a) The Total Aggregate Limit; and
(b) The Designated Location
Aggregate Limit for the applicable
"location".

Such payments will not reduce the
General Aggregate Limit described in
Paragraph 2.d. below, the
Designated Project Aggregate Limit
or the Designated Location
Aggregate Limit for any other
"location".
d. Subject to the Total Aggregate Limit
described in Paragraph 2.a. above, the
General Aggregate Limit shown in the
Schedule 4 Limits Of Insurance And
Designated Projects And _ Locations
applies and is further subject to all of the
following provisions:
(1) The General Aggregate Limit is the
most we will pay for the sum of:
(a) Damages under Coverage A
because of "bodily injury" and
"property damage" caused by
"occurrences", and medical
expenses under Coverage C for
"bodily injury" caused by
accidents, that cannot be
attributed only to operations at a
single "project" or a_ single
"location"; and
(b) Damages under Coverage B.
(2) The General Aggregate Limit does
not apply to damages for "bodily
injury" or "property damage" included
in the "products-completed oper-
ations hazard". Instead, the
Products-Completed Operations
Aggregate Limit described in
Paragraph 3. below applies to such
damages.
(3) Any payments made for damages or
medical expenses to which the
CG D4 69 02 19 © 2017 The Travelers Indemnity Company. All rights reserved.

COMMERCIAL GENERAL LIABILITY
General Aggregate Limit applies will
reduce:
(a) The Total Aggregate Limit; and
(b) The General Aggregate Limit.

Such payments will not reduce the
Designated Project Aggregate Limit
for any "project" or the Designated
Location Aggregate Limit for any
"location".

4. The following replaces Paragraph 3. of SECTION
Ill 4 LIMITS OF INSURANCE:

3. The Products-Completed Operations Aggre-
gate Limit shown in the Declarations is the
most we will pay under Coverage A for
damages because of "bodily injury" or
"property damage" included in the "products-
completed operations hazard". Any payments
made for such damages will not reduce the
Total Aggregate Limit, the General Aggregate
Limit, the Designated Project Aggregate Limit
for any "project" or the Designated Location
Aggregate Limit for any "location".

The following is added to the DEFINITIONS
Section:
"Location" means any designated location shown
in the Schedule 4 Limits Of Insurance And
Designated Projects and Locations that is owned
by or rented to you. For the purposes of
determining the applicable aggregate limit of
insurance, each "location" that includes a
premises involving the same or connecting lots,
or premises whose connection is interrupted only
by a street, roadway or waterway, or by a right-of-
way of a railroad, will be considered a single
"location".
"Project" means any designated project shown in
the Schedule 4 Limits Of Insurance And
Designated Projects And Locations that is away
from premises owned by or rented to you and at
which you are performing operations pursuant to
a contract or agreement. For the purposes of
determining the applicable aggregate limit of
insurance, each "project" that includes a premises
involving the same or connecting lots, or
premises whose connection is interrupted only by
a street, roadway or waterway, or by a right-of-
way of a railroad, will be considered a single
"project".

Page 3 of 3 ends

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

COMMERCIAL AUTO
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

AUTO COVERAGE PLUS ENDORSEMENT
This endorsement modifies insurance provided under the following:

BUSINESS AUTO COVERAGE FORM
GENERAL DESCRIPTION OF COVERAGE - This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered.

A.

B.

Cc.

CA T4 20 02 15

BLANKET ADDITIONAL INSURED

EMPLOYEE HIRED AUTO

EMPLOYEES AS INSURED
SUPPLEMENTARY PAYMENTS 4 INCREASED
LIMITS
TRAILERS 4 INCREASED LOAD CAPACITY

HIRED AUTO PHYSICAL DAMAGE
PHYSICAL DAMAGE 4- TRANSPORTATION
EXPENSES 4 INCREASED LIMIT

BLANKET ADDITIONAL INSURED
The following is added to Paragraph A.1., Who Is
An Insured, of SECTION Il - COVERED AUTOS
LIABILITY COVERAGE:

Any person or organization who is required under
a written contract or agreement between you and
that person or organization, that is signed and
executed by you before the "bodily injury" or
"property damage" occurs and that is in effect
during the policy period, to be named as an addi-
tional insured is an "insured" for Covered Autos
Liability Coverage, but only for damages to which
this insurance applies and only to the extent that
person or organization qualifies as an "insured"
under the Who Is An Insured provision contained
in Section II.

EMPLOYEE HIRED AUTO

1. The following is added to Paragraph A.1.,
Who Is An Insured, of SECTION II 4 COV-
ERED AUTOS LIABILITY COVERAGE:

An "employee" of yours is an "insured" while
operating a covered "auto" hired or rented
under a contract or agreement in an <em-
ployee's" name, with your permission, while
H. AUDIO, VISUAL AND DATA ELECTRONIC
© 2015 The Travelers Indemnity Company. All rights reserved.

ZzraAace
EQUIPMENT 4 INCREASED LIMIT
WAIVER OF DEDUCTIBLE 4 GLASS

PERSONAL PROPERTY

AIRBAGS

AUTO LOAN LEASE GAP

BLANKET WAIVER OF SUBROGATION
performing duties related to the conduct of
your business.

2. The following replaces Paragraph b. in B.5.,
Other Insurance, of SECTION IV 4 BUSI-
NESS AUTO CONDITIONS:
b. For Hired Auto Physical Damage Cover-
age, the following are deemed to be cov-
ered "autos" you own:
(1) Any covered "auto" you lease, hire,
rent or borrow; and
(2) Any covered "auto" hired or rented by
your "employee" under a contract in
an "employee's" name, with your
permission, while performing duties
related to the conduct of your busi-
ness.

However, any "auto" that is leased, hired,
rented or borrowed with a driver is not a
covered "auto".

EMPLOYEES AS INSURED
The following is added to Paragraph A.1., Who Is
An Insured, of SECTION II - COVERED AUTOS
LIABILITY COVERAGE:

Page 1 of 3 ends