Cities Index.
Agenda packet

Cathedral City City Council
September 16, 2026

Document
Agenda packet
Meeting
September 16, 2026
Body
Cathedral City City Council
Pages
5
Original file
94.1 MB
Text extracted from the city's file for reading and search. Open the original on cathedralcity.primegov.com. That file is the official record.

23. Remedies. In addition to any other available remedies, either Party, upon an appropriate showing, shall be entitled to equitable relief including, but not limited to, injunction and specific performance in the event of a
breach or threatened breach of this Agreement. No remedy conferred by any specific provision of this Agreement is intended to be exclusive of any other remedy, and each and every remedy shall be cumulative and shall be in addition to every other remedy gi ven hereunder, or now or hereinafter existing at law, in equity, by
statute or otherwise. The election of one or more remedies by a Party shall not constitute a waiver of the right to pursue other available remedies.

24. Attorneys’ Fees. The prevailing party in any arbitration or legal action arising out of this Agreement shall be entitled to an award of its attorneys’ fees, expert witness fees and costs.

25. Nonassignability. This Agreement may not be assigned by either Party without the express written consent of each of the Parties. For purposes of this Agreement, the prohibition on assignment shall also apply to licenses, sublicenses and subcontractors.

26. Interpretation. This Agreement is in all respects intended by each Party hereto to be deemed and construed to have been jointly prepared by the parties and the parties hereby expressly agree that any uncertainty or ambiguity existing herein shall not be interpreted against either of them.

27. Force Majeure. Company shall not be responsible for any delays or failure to perform for any reason including, but not limited to, fire, flood, strikes, lockouts, accidents, war, terrorist acts, insurrection, Acts of God, inclement weather, delays in transportation, Eq uipment failure, shortage of Equipment, governmental interference or regulation, or any other reason beyond Company’s reasonable control.

28. Waiver. No waiver shall be binding, unless executed in writing by the Party making the waiver. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. Failure of either Party to enforce any provision of this Agreement shall not constitute a waiver of the right to compel enforcement of the remaining provisions of this Agreement.

P a g e 10 | 10

29. Captions and Headings. The captions and headings contained in this Agreement are provided for identification purposes only and shall not be interpreted to limit or define the content of the provisions described under the respective caption or heading.

30. Notices. All notices required or permitted under this Agreement shall be in writing, shall be sent to the Party’s address as set forth immediately below, shall reference this Agreement, and shall be deemed given (i) when delivered personally; (ii) three (3) days after having been sent by registered or certified mail, return receipt requested, postage prepaid; or (iii) one day after deposit with a commercial overnight carrier with verification of receipt.

“Company” Petrochem Materials Innovation, LLC
6168 Innovation Way
Carlsbad, CA 92009

“Customer” City of Cathedral City

Any correctly addressed notice that is refused, unclaimed, or undeliverable because of any act or omission of the Party to be notified will be deemed effective as of the first date that the notice was refused, unclaimed, or deemed undeliverable by the postal authorities, messenger, or overnight delivery service.

A Party may change its address for purposes of receiving notices by giving notice of said change of address in the manner provided for herein.

31. Arbitration. Any and all controversies, claims and disputes arising out of or relating to this Agreement, or the breach thereof, shall be settled by binding arbitration in the County of San Diego, State of California, in accordance with the Commercial Arbitration Ru les of the American Arbitration Association then in effect. The arbitrator shall be an attorney admitted to practice law in the State of California with at least fifteen (15) years of business law experience. The award rendered by the arbitrator shall be final and non-appealable and may be entered as a final judgment in any court having jurisdiction thereof. The award of the arbitrator shall be in the form of findings of fact and conclusions of law and shall set forth in detail the legal and factual basis of the decision.

Agreement 1

AGREEMENT

THIS CONTRACT, by and between the CITY OF CATHEDRAL CITY, a municipal corporation, herein referred to as " City”, and Petrochem Materials Innovation LLC (PMI), herein referred to as, "Contractor."

W I T N E S S E T H:

In consideration of their mutual covenants, the parties hereto agree as follows:

1. Contractor shall furnish all necessary labor, material, equipment, transportation and services to supply and install Type II Rubberized Emulsion Aggregate Slurry (REAS) delivered from an approved center plant for the 2025-2026 REAS Projects for the City of Cathedral City, including traffic control and striping in accordance with attachments A thru H.

2. Contractor will comply with all Federal, State, County, and City of Cathedral City laws, regulations, and policies, which are, as amended from time to time, incorporated herein by reference.

3. All work shall be done in a workman-like manner and to the satisfaction of the City Engineer.

4. Time is of the essence in the Contractor’s performance of the Work for this Contract. The contractor agrees to diligently pursue the performance and completion of the Work in every detail to the satisfaction of the City. The contractor shall commence work after the issuance of a written Notice to Proceed and agrees to have all work completed within forty-five (45) Calendar days from the date of Notification to Proceed.

5. In consideration of said work, City agrees to pay Contractor such sums as shall be approved by the City Engineer at lump sums and/or unit prices stated in the Contractor's Bid. The total consideration to Contractor for all Work shall not exceed five-hundred and eighty-nine thousand, five-hundred and seventy- one dollars, and zero cents ($589,571.00). All payments shall be subject to approval by the City Engineer and shall be in accordance with the terms, conditions, and procedures provided in the Contract Documents.

6. The Contractor shall not knowingly pay less than the general prevailing rate for per diem wages, as determined by the State of California Department of Industrial Relations and referred to in the Invitation to Bid, to any workman employed for the work to b e performed under this contract; and the Contractor shall forfeit as a penalty to the City the sum of Twenty-Five Dollars ($25.00) for each calendar day, or fraction thereof, for such workman paid by him or by any subcontractor under him in violation of this provision (Sections 1770-1777, Labor Code of California).

7. Concurrently with the execution of this Contract, Contractor shall furnish bonds of a surety satisfactory to City, as provided in the Contract Documents , the cost of which shall be paid by Contractor.

Agreement 2

8. Contractor agrees to indemnify, hold harmless, release and defend (even if the allegations are false, fraudulent or groundless), to the maximum extent permitted by law, the City, its City Council and each member thereof, and its officers, employees, commission members and representatives, from any and all liability, loss, suits, claims, damages, costs, judgments and expenses (including attorney's fees and costs of litigation) which in whole or in part are claimed to result from or to arise out of the usage or operation, including the malfunctioning of, or, any injury caused by, any product purchased herein; or any acts, errors or omissions (including, without limitation, professional negligence) of Contractor, its employees, representatives, subcontractors, or agents in connection with the performance of this Contract. This agreement to indemnify includes, but is not limited to, personal injury (including death at any time) and damage to property (including, but without limitation, contract or tort or patent, copyright, trade secret or trademark infringement) sustained by any person or persons (including, but not limited to, companies, or corporations, Contractor and its employees or agents, and members of the general public.

9. Except as otherwise required, Contractor shall concurrently with the execution of this Contract, furnish the City satisfactory evidence of insurance of the kinds and in the amounts provided in the Contract Documents. This insurance shall be kept in full force and effect by Contractor during this entire contract and all premiums thereon shall be promptly paid by it. Each policy shall further state that it cannot be canceled without 30 days unconditional written notice to the City and shall name the City as an additional insured. The Contractor shall furnish evidence of having in effect, and shall maintain Workers Compensation Insurance coverage of not less than the statutory amount or otherwise show a certificate of self -insurance, in accordance with the Workers Compensation laws of the State of California. Failure to maintain the required amounts and types of coverage throughout the duration of this Contract shall constitute a material breach of this Contract.

10. Contractor shall forfeit as a penalty to City $25.00 for each laborer, workman, or mechanic employed in the execution of this Contract by said Contractor, or any subcontractor under it, upon any of the work herein mentioned, for each calendar day during which such laborer, workman, or mechanic is required or permitted to work at other than a rate of pay provided by law for more than 8 hours in any one calendar day and 40 hours in any one calendar week, in violation of the provisions of Sections 1810- 1815 of the Labor Code of the State of California.

11. In accepting this Contract, Contractor certifies that in the conduct of its business it does not deny the right of any individual to seek, obtain and hold employment without discrimination because of race, religious creed, color, national origin, ancestry , physical disability, mental disability, medical condition, genetic information, marital status, sex , gender, gender identity, gender expression, age, sexual orientation, or military and veteran status as provided in the California Fair Employment Practice Act (Government Code Sections 12900, et seq.) Contractor agrees that a finding by the State Fair Employment Practices Commission that Contractor has engaged during the term of this Contract in any unlawful employment practice shall be deemed a breach of this Contract and Contractor shall pay to City $500.00 liquidated damages for each such breach committed under this contract.

12. Contractor also agrees that for contracts in excess of $30,000 that apprentices will

Agreement 3
be employed without discrimination in an approved program in a ratio established in the apprenticeship standards of the craft involved (Sections 1777.5 and 1777.6, Labor Code of California). Contractors who willfully fail to comply will be denied the righ t to bid on public projects for a period of six months in addition to other penalties provided by law.

13. Contractor shall maintain and keep books and records on a current basis, recording all transactions pertaining to this agreement in a form in accordance with generally acceptable accounting principles. Said books and records shall be made available to the County, the State of California, the Federal government, and to any authorized representative thereof for the purposes of audit at all reasonable times and places. All such books and records shall be retained for such periods of time as required by law, provided, however, notwithstanding any shorter periods of retention, all books, records, and supporting detail shall be retained for a period of at least four (4) years after the expiration of the term of this Agreement.

14. This Contract shall not be assignable by Contractor without the written consent of City.

15. Contractor shall notify the City Engineer (in writing) forthwith when the Contract is deemed completed.

16. In accepting this Contract, Contractor certifies that no member or officer of the firm or corporation is an officer or employee of the City except to the extent permitted by law.

17. Contractor certifies that it is the holder of any necessary California State Contractor's License and authorized to undertake the Work. The Contractor must, at the Contractor’s sole expense, obtain all necessary permits and licenses required for the Work, give all necessary notices and pay all fees and taxes required by law, including without limitation, any business license tax imposed by City. The Contractor represents and declares to Agency that it has all licenses, permits ,qualifications, and approvals of whatever nature which are legally required to practice its professions.

18. The City, or its authorized auditors or representatives, shall have access to and the right to audit and reproduce any of the Contractor records to the extent the City deems necessary to insure it is receiving all money to which it is entitled under the contract and/or is paying only the amounts to which Contractor is properly entitled under the Contract or for other purposes relating to the Contract.

19. The Contractor shall maintain and preserve all such records for a period of at least three years after termination of the contract.

20. The Contractor shall maintain all such records in the City of Cathedral City. If not, the Contractor shall, upon request, promptly deliver the records to the City or reimburse the City for all reasonable and extra costs incurred in conducting the audit at a location other than at City offices including, but not limited to, such additional (out of the City) expenses for personnel, salaries, private auditors, travel, lodging, meals and overhead.

21. In entering into this Contract or a contract with a subcontractor to supply goods, services, or materials pursuant to this Contract, Contractor and any or subcontractor are deemed to have offered and agreed to assign to City all rights, title, and interest in and to

Agreement 4
all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C Sec. 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700 of Part 2 of Division 7 of the California Business and Professions Code), arising from purchases of goods, services, or materials for the Contract. This assignment will be deemed made and will be come effective at the time City tenders final payment to Contractor, without further acknowledgement by the Parties.

22. The Parties agree that, in accordance with the City’s Electronic Signature Use Policy, adopted on August 10, 2023, and as amended thereafter, the Parties may use electronic signatures to execute this Agreement. Any use of electronic signatures to execute this Agreement shall comply with the City’s Electronic Signature Use Policy, and such signatures shall have the same force and effect as if this Agreement were executed by hand. Contractor acknowledges that it has had an opportunity to request and review the City’s Electronic Signature Use Policy, and Contractor agrees to comply with the Electronic Signature Use Policy. Contractor agrees to indemnify, defend, and hold the City harmless from any claim, damage, or liability associated with transmitting an electronic signature or an electronically signed record by electronic transmission.

Agreement 5
IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below.

"CITY"

CITY OF CATHEDRAL CITY,
a California municipal corporation

By:_____________________________ Dated: _____________________________ Andrew Firestine, City Manager

ATTEST:

Dated: _____________________________
Christina Burton, City Clerk

APPROVED AS TO FORM:

Dated: _____________________________
Eric S. Vail, City Attorney

“CONTRACTOR”

Dated: By:_______________________________ Name: _______________________________
Title: _______________________________

Dated: By: ____________________________ Name: ________________________________
Title: ________________________________

[CONTRACTOR SIGNATURES MUST BE NOTARIZED. IF CONTRACT IS A

CORPORATION OR LIMITED LIABILITY COMPANY, TWO SIGNATURES MUST BE PROVIDED]

Workers' Compensation Insurance C-1

ATTACHMENT A

WORKERS' COMPENSATION INSURANCE CERTIFICATE

In accordance with California Labor Code Section 1861, prior to commencement of work on the Contract, the Contractor shall sign and file with the City the following certification:

"I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self -insurance in accordance with the provisions of that code, and I will comply with suc h provisions before commencing the performance of the work of this contract."

______________________________________________
Signature

______________________________________________
Title

______________________________________________
Date

Liability & Insurance Requirements D-1

ATTACHMENT B

LIABILITY AND INSURANCE REQUIREMENTS

1.0 INDEMNIFICATION

Contractor shall defend, indemnify and hold harmless the City, City Council and each member thereof, and every officer, employee and agent of City, from any claim, demand, damage, liability, loss, cost or expense (including, without limitation, attorney’s fees and costs) arising from any intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of the Contractor, or any of the Contractor'’ employees, or any of its subcontractors arising out of work under this Contract.

The City does not, and shall not, waive any rights that it may have against Contractor, any of the Contractor’s employees, or any of its subcontractors under this Section because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to this Contract. The hold harmless, indemnification and duty to defend provisions of this Section shall apply regardless of whether or not said insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense described herein. The City will not be liable for any accident, loss, or damage to the work prior to its completion and acceptance.

2.0 INSURANCE REQUIREMENTS

2.1 General

After award of Contract, the Contractor shall promptly obtain, at its own expense, all the insurance required by Paragraph 1340- 2.0, INSURANCE REQUIREMENTS, and shall submit coverage verification for review and approval by the City upon execution of the Contract.

The Notice to Proceed with the Work under this Contract will not be issued, and the Contractor shall not commence work, until such insurance has been approved by the City. The Contractor shall not allow any subcontractors to commence work on its subcontract until all similar insurance required of the subcontractor has been obtained and verified by Contractor. Such insurance shall remain in full force and effect at all times during the prosecution of the Work and until the final completion and acceptance thereof.

The Notice to Proceed does not relieve the Contractor of the duty to obtain such insurance as required by Paragraph 1340-2.0 INSURANCE REQUIREMENTS.

2.2 Commercial General Liability Policy

The Contractor shall take out and maintain during the life of the Contract, a Commercial General Liability Policy, on an occurrence basis, with a minimum limit of not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and pr operty damage for any one occurrence and a Two Million Dollar

Liability & Insurance Requirements D-2
($2,000,000) annual project aggregate, for all of the following:

a. Premises Operations, including Explosion, Collapse and Underground (X, C, and U) Coverage.

b. Completed Operations/Products, including X, C, and U Coverage.

c. Independent Contractors.

d. Blanket Contractual.

e. Deductible shall not exceed One Thousand Dollars ($1,000).

2.3 Commercial Business Auto Policy

The Contractor shall take out and maintain during the life of this Contract a Commercial Business Auto Policy, on an occurrence basis, with a minimum amount of not less than One Million Dollars ($1,000,000) combined single limit for bodily injury and property damage, providing at least all of the following coverage:

a. Coverage shall be applicable to any and all leased, owned, hired, or non-owned vehicles used in pursuit of any of the activities associated with this Contract.

b. Any and all mobile equipment, including cranes, which is not covered under said Commercial Business Auto Policy shall have said coverage provided for under the Commercial General Liability Policy.

c. Deductible shall not exceed One Thousand Dollars ($1,000).

2.4 Workers' Compensation Insurance

The Contractor shall take out and maintain during the life of the Contract, Worker's Compensation and Employers' Liability insurance providing coverage for any and all employees of Contractor:

a. The required policy shall provide coverage for Workers' Compensation (Coverage A).

b. This policy shall provide coverage for One Million Dollars ($1,000,000) Employers' Liability (Coverage B).

2.5 Endorsements

All of the following endorsements are required to be made a part of the policies described in this Section hereof:

a. "The City, City employees and officers, the City Engineer, its consultants, elected officials, agents, and sub- consultants are hereby added as

Liability & Insurance Requirements D-3
additional insured insofar as Work done under this Contract is concerned."

b. "This policy shall be considered primary insurance as respects any other valid and collectible insurance, including self-insured retention, the City may possess, and any other insurance the City does possess shall be considered excess insurance only."

c. "This insurance shall act for each insured, and additional insured, as though a separate policy had been written for each. This, however, will not act to increase the limit of liability of the insuring company.

d. "Thirty (30) days prior written notice of cancellation shall be given to the City. Such notice shall be sent to:

Kevin Biersack, Financial Services Director
City of Cathedral City
68-700 Avenida Lalo Guerrero
Cathedral City, CA 92234

2.6 Change in Terms

The Contractor shall provide immediate written notice to the City of any change in terms and conditions and/or reduction in the coverage of any nature to the insurance policies. The notice shall be sent to the location identified in Paragraph 1340-2.6.d, Endorsements. The Contractor shall be obligated to pay any extra premium for maintaining the insurance requirements specified herein.

ATTACHMENT C

PMI CERTIFICATE OF LIABILITY INSURANCE

ATTACHMENT D

CATHEDRAL CITY COST ESTIMATE
P a g e 1 | 10
City of Cathedral City
Summary of Estimate Charges
Central Mix REAS Type II
Dream Homes
Quote no:
26-82-2 QTY U/M Unit Price Total
2 *Material Type II REAS 82,370 GAL $2.52 207,572.40$ 9 *Freight ($.40 per GAL) 82,370 GAL $0.40 32,948.00$ 10 Tanker Rental 30 EACH $300.00 9,000.00$
12 Slurry Box 5 EACH $350.00 1,750.00$
14 Applicator Trucks 80 HR $285.00 22,800.00$
15 Service Haul Trucks 25 EACH $350.00 8,750.00$
16 Sweeping 48 HR $306.00 14,688.00$
19 Supervisor 5 DAY $2,000.00 10,000.00$
20 Sevice Labor Crew PP/HR 512 HR $120.00 61,440.00$
23 Traffic Control equipment 5 DAY $2,000.00 10,000.00$ 29 Per Diem (per day / per person) 66 DAY $261.50 17,259.00$ 30 Door Hanger 350 EACH $0.30 105.00$
31 Slurry Pump 5 DAY $650.00 3,250.00$
Striping - RS 1 LS $21,594.00 21,594.00$
Subtotal: 421,156.40$
Sales Tax* 9.25% 22,248.14$
443,404.54$
Item
No
Total Estimated Charges (Included Sales Tax)
Prices includes: Type II Central Mix REAS, transportation of material, posting and notifying, traffic control per watch handbook, sweeping, striping in like kind, equipment and labor for application of approximately 741,310 SF. Over 5 days Locations: Dream Homes
Excludes: Bonds, permits of any kind, crack sealing, asphalt repairs, striping, weed kill, traffic plans or permits The foregoing quotation is subject to all the Terms and conditions and pricing are in accordance with the County of Los Angel es Contract No. 244097-2 dated January 9, 2024.

Name: Vicki Nguyen Signature: Date: 8/20/2026 .

P a g e 2 | 10
City of Cathedral City
Summary of Estimate Charges
Central Mix REAS Type II
Assessment District 88-2
Quote No:
25-81-3 QTY U/M Unit Price Total
2 *Material Type II REAS 20,379 GAL 2.52$ 51,355.08$ 9 *Freight ($.40 per GAL) 20,379 GAL 0.40$ 8,151.60$ 10 Tanker Rental 8 LOAD 300.00$ 2,400.00$
12 Slurry Box 1 EA 350.00$ 350.00$
14 Applicator Trucks 24 HR 285.00$ 6,840.00$
15 Service Haul Trucks 5 EA 350.00$ 1,750.00$
16 Sweeping 24 HR 306.00$ 7,344.00$
19 Supervisor 1 DAY 2,000.00$ 2,000.00$
20 Sevice Labor Crew PP/HR 132 HR 120.00$ 15,840.00$
23 Traffic Control equipment 1 DAY 2,000.00$ 2,000.00$ 29 Per Diem =(per day / per person) 14 DAY 261.50$ 3,661.00$ 30 Door Hanger 120 EA 0.30$ 36.00$
31 Slurry Pump 1 DAY 650.00$ 650.00$
Striping - RS 1 LS 2,994.00$ 2,994.00$
Subtotal: 105,371.68$
Sales Tax: 9.25% 5,504.37$
110,876.05$
Item
no:

Total Estimated Charges (Inluded Sales Tax)
Prices Includes: Type II Central Mix REAS, transportation of material, posting and notifying, traffic control per watch handbook, sweeping, striping in like kind, equipment and labor for application of approximately 183,412 SF. Over 1 day Location(s): Assessment District 88-2
Prices Excludes: Bonds, permits of any kind, crack sealing, asphalt repairs, weed kill, traffic plans or permits The foregoing quotation is subject to all the Terms and conditions and pricing are in accordance with the County of Los Angel es Contract No. 244097-2 dated January 9, 2024.

Name: Vicki Nguyen Signature: Date: 8/20/2026 .

P a g e 3 | 10
City of Cathedral City
Summary of Estimate Charges
Central Mix REAS Type II
Cove and Grove Street
Quote no:
26-82-1 QTY U/M Unit Price Total
2 *Material Type II REAS 3,474 GAL $2.52 $8,754.48
9 *Freight ($.40 per GAL) 3,474 GAL $0.40 $1,389.60
10 Tanker Rental 1 LOAD $300.00 $300.00
12 Slurry Box 1 EA $350.00 $350.00
14 Applicator Trucks 8 HR $285.00 $2,280.00
15 Service Haul Trucks 5 EA $350.00 $1,750.00
16 Sweeping 8 HR $306.00 $2,448.00
19 Supervisor 1 DAY $2,000.00 $2,000.00
20 Sevice Labor Crew PP/HR 56 HR $120.00 $6,720.00
23 Traffic Control equipment 1 DAY $2,000.00 $2,000.00
29 Per Diem =(per day / per person) 14 DAY $261.50 $3,661.00 30 Door Hanger 50 EA $0.30 $15.00
31 Slurry Pump 1 EA $650.00 $650.00
Striping - RS 1 LS $2,034.00 $2,034.00
$34,352.08
Sales Tax* 9.25% $938.33
Subtotal:
$35,290.41Total Estimated Charges ( Included sales Tax) Item
no.

Prices Includes: Type II Central Mix REAS, transportation of material, posting and notifying, traffic control per watch handbook, sweeping, striping in like kind, equipment and labor for application of approximately 31,265 SF. Over 1 day.

Location(s): Cove and Grove street
Prices Excludes: Bonds, permits of any kind, crack sealing, asphalt repairs, weed kill, traffic plans or permits The foregoing quotation is subject to all the Terms and conditions and pricing are in accordance with the County of Los Angeles Contract No. 244097-2 dated January 9, 2024.

Name: Vicki Nguyen Signature: Date: 8/20/2026 .

Technical Specifications 4000-7

ATTACHMENT E

PMI'S REPRESENTATIONS AND WARRANTIES
PMI hereby makes the following representations, warranties and acknowledgments, and agrees that such representations, warranties and acknowledgments shall be true as of the Effective Date:
a. PMI has the full right, power and authority to enter into this Agreement and to sell Central Mix and rent the Equipment to the City, and to take all actions required of PMI by the terms of this Agreement.
b. All the documents executed by PMI pursuant to this Agreement will be duly authorized, executed and delivered by PMI and will be legal, valid and binding obligations of PMI enforceable against PMI in accordance with their respective terms, and will not violate any provisions of any agreement to which PMI is a party or to which it is subject.
c. PMI has manufactured the Central Mix and has centrally mixed the Central Mix in accordance with Sections 203-5.5 and 203-5.5 .3, respectively, of the Greenbook. d. PMI has good and marketable title to the Type II Central Mix, which is to be sold and transferred to the City free and clear of all liens, security agreements, encumbrances, claims, demands, and charges of every kind and nature whatsoever.
e. The Central Mix and Equipment are free from all defects and are of good quality and fit for the purposes and uses intended herein.
f. PMI possesses the ability to deliver approximately 106,223 gallons of Type II Central Mix daily to Cathedral City, California, during the term of this Agreement. g. The Equipment has been maintained in substantial accordance with the specifications of the Equipment manufacturers, or has otherwise been maintained in a manner to enable PMI to complete the Project.
h. PMI has inspected the Equipment and the Equipment is or will be in good and operable condition as of September 16, 2026, sufficient to enable PMI to complete the Project on a timely basis.

Technical Specifications 4000-8

PRODUCT AND DELIVERY WARRANTIES

a. PMI hereby warrants that the Type II Central Mix product (sometimes hereinafter, "Product") will not Fail (as defined hereinafter) for five (5) years from the date of application (hereinafter, "Useful Life"), provided all persons involved in the installation of the Product substantially foll ow the guidelines, instructions, recommendations and best practices published and/or provided by PMI. The City hereby grants PMI and its representatives, in consultation with the City's inspector, the right to inspe ct, observe, monitor, provide instructions and recommend corrective actions to the City and any person installing the Product on all applications of the Product, including, without limitation, compliance with the guidelines and best practices for the application of the Product. The granting of this right to PMI and its representatives does not impose any additional duty on PMI or its representatives in addition to those duties outlined in this Agreement. b. Should the Product Fail, PMI shall, at its election, and within thirty (30) days after determination of Failure, either repair or pay for the material cost of the Product to repair those areas of the Product covered by this warranty that Fail during its Useful Life, as well as for labor and other incidental costs (hereinafter, "Labor and Incidental Costs"), including, but not limited to, any affected striping, markings, and reflective pavement markers; provided, however, that such Failure shall occur within one (1) year from the date of Product application. For any Failure that occurs thereafter but during the Useful Life, PMI shall only be responsible for the repair or payment for the material cost of the Product, which shall also occur within thirty (30) days after determination of Product Failure. For purposes of this Agreement, whether the Product has Failed must be evaluated using the Slurry Seal Survey Procedures set forth in Exhibit "D" ("SSSP"), attached hereto and incorporated herein by this reference. The term "Fail," "Fails," "Failure" or "Failed" shall mean that, prior to the expiration of the Useful Life, more than ten percent (10%) of the native asphalt for any street segment (as defined in Exhibit "D") becomes uncovered (i.e., no longer covered by the Product), and such uncovering does not arise out of conditions outside of PMI's control, including, but not limited to, subgrade conditions, improper subbase and/or compaction, cracks, earthquakes, over watering, frequent sprinkler over spray, standing or ponding water, heavy truck or equipment traffic, corrosive or acid materials that may leak or spill on the Product, or a Force Majeure event, as defined below.
c. Provided PMI and the City mutually agree, either Steve Marvin, of LaBelle Marvin, or Steve Escobar, of Asphalt Pavement and Recycling Technology, shall make the exclusive determination of whether the Product "Failed" during its Useful Life and, if so, identify the areas and the square footage of Failure that "Failed." If PMI elects not to perform the repair itself, then PMI shall pay one hundred percent (100%) of the Product material cost for the percentage of "Failed" square footage, and for any related Labor and Incidental Costs to the extent there may be any Labor and Incidental Costs during the first year of the Product's Useful Life. If Steve Marvin or Steve Escobar are unavailable to make the determination of whether the Product "Failed," an independent engineer approved by both the City and PMI with qualifications and experience as extensive as Steve Marvin's or Steve Escobar's shall be used. This warranty only applies to the Project that is the subject of this Agreement and no other location. If t he evaluator concludes the Product Failed, PMI will bear the cost of the evaluation. If the evaluator concludes the Product did not Fail, the City will bear the cost of the evaluation. d. This warranty shall be ineffective unless the City provides PMI written notice of any problems, defects or perceived Failures of the Product within thirty (30) days of the City's discovery of the problem, defect or perceived Failure. PMI shall be given the opportunity to inspect, investigate, test, repair and remediate any alleged problems, defects or failures in connection with the Product prior to any repair by the City, and, repair without notice shall void and waive this warranty. Inspection, investigation, testing, repair and remediation by PMI shall not operate as an admission of liability by PMI.
e. Subject to Sections 21b and 21f hereof, regardless of whether any remedy set forth herein fails of its essential purpose, in no event shall PMI be liable to City for any special, consequential, incidental, exemplary, punitive, indirect or similar damages, including loss of profits, Joss of use, or personal injury, in connection with any Failed Product, even if PMI has been advised of the possibility of such damages. f. Notwithstanding anything else to the contrary herein, in the event PMI should fail to deliver the entirety of any per diem amount of Type II Central Mix as required by the City in accordance with Section 2 of this Agreement, or, in the event of a delay due to any portion of the Type II Central Mix being deemed by the City to be unusable for the timely completion of the Project through sample testing or otherwise, PMI shall be responsible and shall immediately pay for any and all direct or indirect damag es of whatever character, nature or kind, in connection therewith, in accordance with the method of calculation of damages from delays set forth in Technical Specifications 4000-9
Section 25 of the General Provisions, which is expressly incorporated herein by this reference with the same force and effect as though set forth at length herein, and which provisions are part of the City's contract with Contractor for the Project; provided, however, that PMI shall not be held responsible for delays if such delays are as a result of any Act of God (hereinafter, "Force Majeure"), which includes fire, flood, earthquake, storm, hurricane or other natural disaster, war, invasion, act of foreign enemies, hostilities (regardless of whether war is declared), civil war, rebellion, revolution, insurrection, military or usurped power or confiscation, terrorist activities, government sanction, blockage, embargo, labor dispute, strike, lockout or inter ruption or failure of electricity or telephone service . In the event of any delay, PMI shall immediately notify the City in writing of the delay and the estimated extent of the delay, and the cause of the delay. The term of this Agreement, including the R ental Term, may be extended by the City in the City's sole discretion in the event of a Force Majeure delay but in no event shall PMI be considered in breach of this Agreement or any warranty as a result of any such Force Majeure delay.

Technical Specifications 4000-10

ATTACHMENT F

PMI MASTER TERMS AND CONDITIONS

P a g e 4 | 10

Master Terms and Conditions

1. Binding Agreement. The following terms and conditions constitute a binding agreement (“Agreement”) effective as of July 1 , 2015 (“Effective Date”) by and between Petrochem Materials Innovation, LLC, a California limited liability company (“Company”) and the undersigned cu stomer (“Customer”) and govern all goods sold and all Equipment (as defined hereinafter) rented, leased or provided by Company to Customer and shall be deemed to be incorporated in all invoices, purchase orders, price quotations and shipping confirmations. Company and Customer are sometimes hereinafter individually referred to as a “Party” and collectively referred to as the “Parties.” For purposes of this Agreement the term “Equipment” shall mean all trucks, trailers, tractors, pumpers, tankers, tanks, mixers, vehicles and tools. Nothing contained in any purchase order, memoranda or other writing submitted by Customer to Company shall modify, amend or supersede this Agreement or any portion thereof. Customer’s submission of any provisions that are incons istent, in conflict with or create any ambiguity with this Agreement or any portion thereof are rejected. Company’s failure to object to any different terms or conditions shall not constitute acceptance or approval by Company.

2. Quotations and Pricing. All price quotations provided by Company to Customer shall only be valid for the duration and project specified in the written quotation provided by Company. Company reserves the right in its sole and absolute discretion to decline to quote or sell to Cu stomer. Company shall not be liable for any refusal to quote Customer or rejection of any offer to purchase by Customer.

Any request for quotation by Customer shall constitute a representation that Customer is solvent. All requests for quotation shall specify the name and address of the project where the goods and Equipment will be used, name and address of the original contractor, name and address of the public agency and any other information reasonably requested by Company to enable Company to serve a Preliminary Notice or Stop Notice pursuant to the California Civil Code. Company’s issuance of a quotation to Customer shall not obligate Company to provide any future quotations to Customer. Company reserves the right to require Customer to adhere to quality control measures imposed by Company in its sole and absolute discretion as a condition of accepting any offer to purchase by Customer and/or delivering goods and/or renting Equipment to the Customer. The parties agree that the foregoing provision is reasonable based on the need to maintain the quality of the goods, their application, the reputation of the brand and to maintain public safety. Customer shall be free to resell the goods purchased from Company at any price sele cted by Customer. The Equipment identified in any price quotation is subject to availability. Unless expressly provided in any price quotation, the prices in the quotation do not include an operator(s). The prices set forth in any price quotation will be charged from the time the Equipment leaves Company’s facility until it is returned, without proration for partial days and without regard as to whether the Equipment is actually used unless specifically provided otherwise in the applicable price quotation.

3. Delivery and Risk of Loss.
a. If the Company delivers the goods, delivery shall take place and all risk of loss shall pass when Company delivers the goods to the project and they pass the last flange on Company’s truck or trailer.

If the Customer or its representative pick up the goods, delivery and all risk of loss shall pass when the goods pass the last flange on Company’s piping at Company’s plant. Company shall have the right to allocate goods to its customers pro rata in the event the Company experiences a shortage of goods. All claims for defective goods shall be made within ten (10)

P a g e 5 | 10

calendar days of delivery. Failure to make a claim within that time shall operate as unequivocal acceptance and waiver of all claims.
b. Delivery of the Equipment from Company to Customer shall take place when the Equipment leaves the gate at Company’s South Gate or El Cajon facilities, as applicable, and shall not be deemed to be returned until the Equipment is delivered back inside of the gate at Company’s South Gate or El Cajon facilities, as applicable, in the same condition as when the Equipment left, ordinary wear and tear excepted. Customer shall be responsible for all risk of loss, damages and liability from the point in time that the Equipment leased or rented by Company to Customer leaves the gate at Company’s facility until it is returned back inside the gate at
Company’s facility. Customer shall be solely responsible for the loss of any materials transported or mixed in the Equipment leased or rented by Company to Customer after the Equipment leaves Company’s facility and before it is returned to Company’s facility including, but not limited to, any loss of materials which solidify, break, or become stuck as a result of the failure of the Customer to follow the operating instructions for the Equipment. Customer shall operate the Equipment in compliance with all applicable laws, ordinances and regulations. Customer shall be solely responsible for all fines and violations arising out of or relating to the Customer’s use or operation of the Equipment. Customer is only obtaining the right to use the Equipment specified in the applicable price quotation and shall obtain no ownership interest in the Equipment.

4. Payment Terms. Company’s standard terms of sale of goods and rental of Equipment are cash on delivery unless the Company grants credit to Customer in Company’s sole and absolute discretion.

All goods, applicable freight and insurance charges and Equipment rental charges will be invoiced as of the date of delivery. Company reserves the right to suspend credit, change credit terms or deny credit in its sole discretion at any time with or without notice to Customer. Company reserves the right to require from Customer adequate assurances of performance before delivery of goods or rental of Equipment. Company reserves the right to suspend performance until Company receives adequate assurances satisfactory to Company. Company shall have the right to take possession of the Equipment and/or goods if Customer fails to make timely payment within forty eight (48) hours of the time that Customer is deemed to have received written notice of failure to make payment. Payment by Customer to Company shall not be contingent upon Customer receiving payment from any third party. Customer shall pay all sales, use and excise taxes. Interest at eighteen percent (18%) per annum shall accrue on all past due payments. Customer’s failure to pay invoices when due, at Company’s election shall make all subsequent invoices immediately due and payable irrespective of prior negotiated terms. Company may withhold delivery or shipment of goods or rental of Equipment until Customer’s account is settled in full. Customer expressly w aives any liability of Company for any refusal to deliver goods or rent Equipment for accounts in arrears. Customer authorizes Company to obtain credit information on Customer on an ongoing basis and authorizes the release of all credit information on Cus tomer to Company.

5. Equipment.
a. Company requires that each third-party user and operator of Company’s Equipment be briefed on the proper use of the Equipment and acknowledge that the user understands all such requirements in writing on a form which is substantially similar to Exhibit “ A” hereto. Each employee of Customer who will make use of or operate the Equipment shall sign a form that is substantially similar to Exhibit “A” hereto before Customer’s employee will be permitted to make any use of or operate the Equipment. b. The fuel level of all Equipment will be recorded when it leaves Company’s facility and the Customer is responsible for returning the Equipment to Company’s facility with the same amount of fuel as when it left. If the Equipment is returned with less f uel than when the Equipment left Company’s

P a g e 6 | 10

facility, the Customer will be responsible for paying the cost of the fuel to bring the fuel level back to the level when it departed Company’s facility.
c. Customer shall be responsible for maintaining the Equipment inside and outside in a clean manner. Customer will be charged for the cost of cleaning the Equipment if it is not returned to Company in at least as clean a condition as when it left the Company facility. No smoking is allowed in or around any of the Equipment.
d. All material valves shall be closed when transporting all Equipment. All lids and covers shall be maintained in a closed condition on all Equipment. Customer shall check for damage to all Equipment on a regular basis no less frequently than prior to departure from Company’s facility and again when the Equipment is returned to Company’s facility.
e. Customer shall notify Company of any operating problems or any required repairs to the Equipment so that Company can make any required repairs. An authorized representative of the Customer will be required
to confirm in writing on a form substantially similar to Exhibit “B” that the Equipment (i) delivered at the start of the work day is in good operating condition free from any operating problems or required repairs, and (ii)

was returned in good operating condition free from any operating problems or required repairs. The Customer is responsible for promptly notifying Company in writing of any operating problems or required repairs so that any operating problems or required repairs can be promptly handled. Company shall not be responsible for any damages or delays as a result of operating problems or required repairs if the Customer does not promptly notify Company. Customer shall be responsible for all damages to the Equipment while the Equipment is in the possession, custody or control of the Customer.

6. Insurance Requirements For Equipment Rental.
a. Coverage. Customer shall procure and maintain at its own expense comprehensive general liability insurance of not less than One Million Dollars ($1,000,000) combined single limit per occurrence, and Two Million Dollars ($2,000,000) in the aggregate, for bodily inj ury, personal injury, death, loss or damage resulting from the use or operation of the Equipment by Customer or its officers, employees, servants, volunteers, agents and independent contractors. Customer shall further procure and maintain at its own expense commercial vehicle liability insurance covering personal injury and property damage, of not less than One Million Dollars ($1,000,000) combined single limit per occurrence, and Two Million Dollars ($2,000,000) in the aggregate, covering the Equipment that names Company as the loss payee.

Said policies of insurance shall have deductibles of One Thousand Dollars ($1,000) or less. b. Workers Compensation Insurance. Customer shall procure and maintain at its own expense, during the term of this Agreement, workers' compensation insurance, providing coverage as required by the California State Workers' Compensation Law.
c. Additional Named Insured. Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, the protection offered by all policies, except for Workers' Compensation coverage, shall bear an endorsement whereby it is provided that, Company and its officers, directors, shareholders, members, managers, employees, agents, representatives and lessors are named as an additional insured. d. Proof of Insurance Coverage; Certificates. Customer shall secure from a good and responsible company or companies authorized to do insurance business in the State of California the policies of insurance required by this Agreement and furnish to Company certificates of said insurance on or before delivery or use of the Equipment by the Customer . Each policy required herein must be endorsed to provide that the policy shall not be cancelled or reduced in coverage unless the insurer has provided Company with thirty (30) days prior written notice of cancellation or reduction in coverage.

P a g e 7 | 10

All insurance policies required to be provided by Customer or any other party must be endorsed to provide that the policies shall apply on a primary and noncontributing basis in relation to any insurance or self-insurance, primary or excess, maintained or available to Company. The insurance provisions of this Agreement shall in no way modify Customer’s duty to indemnify, defend and hold Company harmless pursuant to the terms of this Agreement. Company shall have the right to terminate this Agreement immedi ately and take possession of the Equipment if the Customer fails at any time to provide and maintain the required insurance or certificates.

7. Trademarks and Intellectual Property. Customer shall not make any use of the Flex Seal® or other Company trademarks, service marks or symbols unless Customer has submitted such proposed use to Company and received Company’s express prior written consent. Customer shall not use Company’s trademarks, service marks or symbols in Customer’s business name or letterhead. Company and its licensor shall be the exclusive
owner of the Flex Seal® trademarks, service marks, symbols, trade secrets, confidential information, know how, copyrights and patents together with all Improvements (as defined hereinafter) to any of the foregoing and
Customer shall not challenge such exclusive ownership or make any unauthorized use. For purposes of this Agreement, “Improvements” shall mean all inventions, modifications, revisions, alterations, enhancements, betterments, ideas and discoveries (whether or not patentable) conceived or reduced to practice (actually or constructively), either solely or jointly with others.

8. Disclaimer of Warranties. Customer shall be solely responsible for determining whether the goods and Equipment are appropriate for any project or application or whether the goods must be modified to make them suitable for any project or application. Company makes no representati on or warranty that the goods or Equipment will be suitable for any particular project or application. It shall be the Customer’s sole responsibility to obtain a mix design from a qualified engineer for each project or application. Company shall have no liability for any mix designs used by Customer.

COMPANY HEREBY DISCLAIMS ALL REPRESENTATIONS AND WARRANTIES, EXPRESS OR

IMPLIED, AS TO THE GOODS AND EQUIPMENT, INCLUDING BUT NOT LIMITED TO, ANY

IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE AND WARRANTY OF MERCHANTABILITY.

COMPANY HAS NO CONTROL OVER THE MATERIAL SUPPLIERS SELECTED BY BUYER OR THE MATERIALS PURCHASED FROM THIRD PARTIES. COMPANY SHALL HAVE NO

LIABILITY FOR ANY MATERIALS PURCHASED BY BUYER FROM ANY

THIRD PARTIES. BUYER SHALL BE SOLELY RESPONSIBLE FOR VERIFYING THAT ALL

MATERIALS OBTAINED BY BUYER FROM THIRD PARTIES ARE COMPATIBLE WITH ANY MATERIALS PURCHASED BY BUYER FROM COMPANY. BUYER SHALL BE SOLELY RESPONSIBLE FOR ADJUSTING AND CALIBRATING BUYE R’S EQUIPMENT TO ACCOUNT FOR VARIATIONS IN THE MATERIALS PURCHASED BY BUYER FROM THIRD PARTIES.

COMPANY SHALL NOT BE LIABLE FOR ANY CALIBRATION OR OTHER ASSISTANCE THAT MAY BE PROVIDED TO BUYER BY COMPANY.

9. Limitation of Liability. Company shall not be liable under any circumstances for any special, consequential, incidental, punitive or exemplary damages arising out of or in any way connected with this Agreement to sell goods or rent Equipment to the Customer, including damages for loss of use, lost profits, or damages paid to third parties even if Company has been advised of the possibility of such damages. Customer’s exclusive remedy and Company’s entire liability to Customer shall be limited to the total invoice price paid or incurred by Customer for the goods and/or Equipment that are the subject

P a g e 8 | 10

of any dispute or claim for damages. Customer shall report all alleged problems with the goods and Equipment to Company immediately. Company shall have no liability for any problems which are not reported immediately. No legal action shall be brought by Customer against the Company for any claim with respect to any goods sold or Equipment rented by Company to Customer more than one (1) year after delivery of such goods or Equipment to the Customer. It is agreed that any cause of action with respect to such goods or Equipment shall accrue as the date of delivery of such goods or Equipment.

10. Relationship of the Parties. Nothing in this Agreement shall restrict Company’s right to sell the same or similar goods to third parties. The relationship of the Parties shall be that of purchaser and vendor and/or lessor and lesser, as applicable, and nothing contained in this Agr eement shall be construed to create a joint venture, association, agency, partnership or franchise relationship.

11. Termination. Either Party may terminate this Agreement on thirty (30) calendar day written notice. Any such termination shall not affect any accepted orders or the duty of Customer to make payment.

12. Indemnification. Customer shall indemnify, defend, and hold harmless Company and its officers, directors, shareholders, partners, members, managers, agents, employees, attorneys, successors, and permitted assigns with respect to any and all claims, demands, liabilities, judgments, awards, liens, losses, damages, or
costs (including reasonable attorneys’ fees and expenses) of any kind or nature arising from or in any manner related to (i) any use of the goods purchased or Equipment rented from Company; or (ii) the failure of Customer to observe or perform the covenant s and agreements of Customer under this Agreement (hereinafter collectively “Claims”) with the exception of Claims caused by the sole negligence of Company. Customer’s duty to defend, indemnify and hold harmless the Company shall survive the termination of this Agreement for any reason.

13. Further Assurances. Each of the Parties hereto agrees to execute and deliver any and all additional papers and documents, and to do any and all acts reasonably necessary in connection with performance of its obligations hereunder to carry out the intent of the Parties hereto.

14. Entire Agreement. This Agreement and the documents expressly referenced herein, shall constitute the entire Agreement between the Parties hereto with respect to the subject matter hereof, and shall supersede all prior and contemporaneous agreements, representations and negotiations of the Parties concerning the subject matter hereof and the terms applicable thereto.

15. Amendment. This Agreement may not be supplemented, modified or amended in any manner, except by an instrument in writing stating that it is a supplement, modification or amendment of this Agreement and signed by each of the Parties hereto.

16. Waiver. No waiver of any of the provisions of this Agreement shall be deemed or constitute a waiver of any other provision, whether or not similar, nor shall any waiver constitute a continuing waiver. No waiver shall be binding unless executed in writing by the Party making the waiver.

17. Successors and Assigns. All terms and provisions contained herein shall inure to the benefit of and shall be binding on each of the Parties hereto and their respective directors, officers, shareholders, partners, members, managers, employees, agents, heirs, representatives, suc cessors and permitted assigns and each of them.

18. Applicable Law. This Agreement shall be deemed to have been entered into , and shall be construed and interpreted, in accordance with the laws of the State of California without reference to California’s application of principles of conflicts of law.

P a g e 9 | 10

19. Severability. In the event that any provisions hereof are deemed to be illegal or unenforceable, such a determination shall not affect the validity or enforceability of the remaining provisions hereof, all of which shall remain in full force.

20. Form. As used in this Agreement, the masculine, feminine and neuter gender, and singular and plural number shall be deemed to include the other and others whenever the context so indicates. All captions used in this Agreement are for convenience only and shall not be construed in interpreting this Agreement.

21. Time is of The Essence. Time is of the essence for this Agreement and all of the terms, provisions, covenants and conditions hereof.

22. Parties In Interest. Nothing in this Agreement, whether express or implied, is intended to confer any rights or remedies under or by reason of this Agreement on any persons other than the Parties to it and their respective successors and permitted assigns, nor is anything in this Agreement intended to relieve or discharge the obligation or liability of any third persons to any Party to this Agreement, nor shall any provision give any third persons any right of subrogation or action over or against any Party to this Agreement.

23. Remedies. In addition to any other available remedies, either Party, upon an appropriate showing, shall be entitled to equitable relief including, but not limited to, injunction and specific performance in the event of a
breach or threatened breach of this Agreement. No remedy conferred by any specific provision of this Agreement is intended to be exclusive of any other remedy, and each and every remedy shall be cumulative and shall be in addition to every other remedy gi ven hereunder, or now or hereinafter existing at law, in equity, by
statute or otherwise. The election of one or more remedies by a Party shall not constitute a waiver of the right to pursue other available remedies.

24. Attorneys’ Fees. The prevailing party in any arbitration or legal action arising out of this Agreement shall be entitled to an award of its attorneys’ fees, expert witness fees and costs.

25. Nonassignability. This Agreement may not be assigned by either Party without the express written consent of each of the Parties. For purposes of this Agreement, the prohibition on assignment shall also apply to licenses, sublicenses and subcontractors.

26. Interpretation. This Agreement is in all respects intended by each Party hereto to be deemed and construed to have been jointly prepared by the parties and the parties hereby expressly agree that any uncertainty or ambiguity existing herein shall not be interpreted against either of them.

27. Force Majeure. Company shall not be responsible for any delays or failure to perform for any reason including, but not limited to, fire, flood, strikes, lockouts, accidents, war, terrorist acts, insurrection, Acts of God, inclement weather, delays in transportation, Eq uipment failure, shortage of Equipment, governmental interference or regulation, or any other reason beyond Company’s reasonable control.

28. Waiver. No waiver shall be binding, unless executed in writing by the Party making the waiver. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether or not similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision. Failure of either Party to enforce any provision of this Agreement shall not constitute a waiver of the right to compel enforcement of the remaining provisions of this Agreement.

P a g e 10 | 10

29. Captions and Headings. The captions and headings contained in this Agreement are provided for identification purposes only and shall not be interpreted to limit or define the content of the provisions described under the respective caption or heading.

30. Notices. All notices required or permitted under this Agreement shall be in writing, shall be sent to the Party’s address as set forth immediately below, shall reference this Agreement, and shall be deemed given (i) when delivered personally; (ii) three (3) days after having been sent by registered or certified mail, return receipt requested, postage prepaid; or (iii) one day after deposit with a commercial overnight carrier with verification of receipt.

“Company” Petrochem Materials Innovation, LLC
6168 Innovation Way
Carlsbad, CA 92009

“Customer” City of Cathedral City

Any correctly addressed notice that is refused, unclaimed, or undeliverable because of any act or omission of the Party to be notified will be deemed effective as of the first date that the notice was refused, unclaimed, or deemed undeliverable by the postal authorities, messenger, or overnight delivery service.

A Party may change its address for purposes of receiving notices by giving notice of said change of address in the manner provided for herein.

31. Arbitration. Any and all controversies, claims and disputes arising out of or relating to this Agreement, or the breach thereof, shall be settled by binding arbitration in the County of San Diego, State of California, in accordance with the Commercial Arbitration Ru les of the American Arbitration Association then in effect. The arbitrator shall be an attorney admitted to practice law in the State of California with at least fifteen (15) years of business law experience. The award rendered by the arbitrator shall be final and non-appealable and may be entered as a final judgment in any court having jurisdiction thereof. The award of the arbitrator shall be in the form of findings of fact and conclusions of law and shall set forth in detail the legal and factual basis of the decision.

Technical Specifications 4000-11

ATTACHMENT G
COUNTY OF LOS ANGELES CONTRACT 59680

Technical Specifications 4000-12

ATTACHMENT H

MAPS OF PROGRAMMED STREETS

Staff Report
City Council
Item No. 4.D
Meeting Date: September 16, 2026
From: Armando J. Garcia Baldizzone, City Engineer
Title: HSIP Cycle 13 Grant Application Preparation
RECOMMENDATION:

To authorize the City Engineer to execute a task order with Albert A. Webb Associates (Webb), in the not-to-exceed amount of $64,901, to provide engineering assistance, supporting traffic engineering evaluations, and prepare up to four (4) grant applications for the Highway Safety Improvement Program (HSIP) Cycle 13 Call for Projects; and authorize the City Engineer to submit the completed HSIP Cycle 13 grant application packages to the California Department of Transportation (Caltrans).

BACKGROUND:

The Highway Safety Improvement Program (HSIP) is a core federal-aid program with the purpose of achieving a significant reduction in traffic fatalities and serious injuries on all public roads, including non-State-owned public roads and roads on tribal land. The HSIP is one of the core federal-aid programs in the federal surface transportation act, Infrastructure Investment and Jobs Act (IIJA), which was signed into law on November 6, 2021.

The California local HSIP program funds local highway safety improvement projects through a two-year Call for Projects cycle. The timing and size of the call is determined by the program apportionments, HSIP Federal Transportation Improvement Program (FTIP) capacity and the delivery of the existing HSIP Projects.

The Caltrans Division of Local Assistance (DLA) manages California's local agency share of HSIP funds. The program prioritizes infrastructure projects that address documented collision patterns and implement eligible countermeasures to reduce crash frequency and severity. The projects are evaluated based on their anticipated benefits of the proposed improvements relative to the project cost, also known as the benefit-cost ratio (BCR).

The city has been successful in securing HSIP grant funding through multiple funding cycles to implement roadway, pedestrian, and traffic improvements throughout the community.

Since HSIP Cycle 8, the city has been awarded approximately $9.0 million in HSIP funding for ten safety improvement projects, as summarized below:

HSIP Cycle Project Grant
awarded
HSIP Cycle 8 20 Intersection Upgrades $1,674,000
HSIP Cycle 9A 12 Intersection Upgrades $1,302,500
HSIP Cycle 9B Varner Road Safety Improvements $1,089,700 HSIP Cycle 10 Pedestrian Crossing at Ramon Road and Candlewood Drive $776,600 HSIP Cycle 11A Citywide Pedestrian Crosswalk Upgrades (18 intersections) $1,306,890 HSIP Cycle 11B Pedestrian Signals/Hybrid Beacons (2 intersections) $959,670 HSIP Cycle 11C Citywide Traffic Signal Hardware Improvements (49 intersections) $1,008,000
HSIP Cycle 11D Pedestrian School Crossing Upgrades at 30th Avenue and San Eljay Avenue $249,840
HSIP Cycle 12A Pedestrian Crossing Enhancements (3 intersections) $349,920 HSIP Cycle 12B Pedestrian Crossing at Uncontrolled Locations (6 intersections) $272,160 Total $8,989,280
Note: These grants represent the state/federal funding of each application. The latest call for grants under the HSIP Cycle 13 Program has variable grant participation amounts based on a maximum reimbursement ratio of either 100%, 90% and 50% depending on the project’s safety countermeasure utilized. Under this new requirement, the projects outlined in the discussion below will require a 10% or a 0% participation amount with a 90% and 100% reimbursement ratio, respectively.

In June 2026, the city completed an update to its Local Road Safety Plan (LRSP). The LRSP evaluated recent collision data, identified high-risk locations, evaluated potential safety countermeasures, and developed a prioritized list of projects for future implementation and grant funding. The LRSP is required for agencies seeking grant funding through HSIP and serves as the basis for the city's upcoming HSIP Cycle 13 grant application.

Caltrans announced the HSIP Cycle 13 Call for Projects on July 1, 2026, with applications due November 2, 2026. Staff intend to pursue funding for priority projects identified in the city's updated LRSP. The LRSP is attached to this report.

DISCUSSION:

The LRSP identified 17 locations for specific improvements and consolidated them into five (5) priority projects. Priority projects 1 through 3 include the Cathedral City Intersection Safety Program, Ramon Road Safety Improvements, and Date Palm Drive Safety Improvements. These projects were recommended for HSIP applications based on collision history and anticipated benefits associated with the proposed improvements. The other priority projects, Santoro Drive and Ramon Road bicycle projects were identified as potential candidates for Active Transportation Program (ATP) funding or other grant opportunities.

The HSIP Cycle 13 applications will focus on LRSP Priority Projects 1 through 3. A description of these projects is as follows:
LRSP Priority Project 1 – Cathedral City Intersection Safety Program The Cathedral City Intersection Safety Program is composed of improvements to eight (8) locations in the city. The safety goals of the project are to improve conditions for vehicles and vulnerable users based on collision history and factors experienced at project locations. The project cost estimate is $2.5 million. LRSP Priority Project 2 – Ramon Road Safety Improvement The Ramon Road Safety Improvements is composed of improvements to five (5) intersections. The safety goals of the project are to improve conditions for vulnerable users and improve intersection conditions at off-set intersection locations. The project cost estimate is $1.8 million.
LRSP Priority Project 3 – Date Palm Safety Improvements The Date Palm Safety Improvements is composed of improvements to three (3) locations. The safety goals of the project are to address high speeds, unprotected left-turns, and poor lighting in the corridor. The project cost estimate is $4.7 million.

Attached to this report are a map identifying the locations within each priority project and a summary describing the proposed improvements at each location.

Recent HSIP funding cycles have become increasingly competitive. Therefore, staff requested a proposal from Albert A. Webb and Associates Inc. (Webb), the city’s on-call traffic consultant, to assist the city in developing the HSIP Cycle 13 applications. Webb will review the locations and improvements identified within the three LRSP priority projects and determine how they can be combined or reorganized to develop four (4) competitive HSIP Cycle 13 grant applications.

The city plans to use these grant applications to fund safety improvement projects over the next four years. The goal is to secure funding for approximately one application each year.

This approach will help the city use available grant funding to continue making roadway and pedestrian improvements throughout the community.

Webb submitted a proposal dated August 25, 2026, to provide these services on a time-and- materials basis for a not-to-exceed amount of $64,901. The proposed fee includes $20,332 for safety assessment and project optimization, $10,370 for supporting traffic engineering evaluations, $28,748 for development of up to four HSIP applications, and $5,451 for project coordination, application refinement, and submittal.

Webb’s scope of work includes collision analyses, evaluation of applicable Caltrans safety countermeasures, planning-level cost estimates, and benefit-cost analyses using the Caltrans HSIP Analyzer. The scope also includes traffic engineering evaluations at selected locations, including traffic counts and traffic signal and all-way stop warrant analyses. Based on these evaluations, Webb will prepare the project narratives, exhibits, schedules, cost estimates, and supporting documentation required for the HSIP Cycle 13 applications.

Staff recommends that the City Council authorize the City Engineer to execute a task order with Albert A. Webb Associates (WEBB), in the not-to-exceed amount of $64,901, to provide engineering assistance, perform supporting traffic engineering evaluations, and prepare up to four (4) grant applications for the Highway Safety Improvement Program (HSIP) Cycle 13 Call for Projects; and authorize the City Engineer to submit the completed HSIP Cycle 13 grant application packages to the California Department of Transportation (Caltrans).

FISCAL IMPACT:

The not-to-exceed cost for the HSIP Cycle 13 grant application preparation and supporting traffic engineering evaluations is $64,901. Staff proposes to fund these services from the Engineering Professional and Technical Services account, 100-100-150-156-8600-8601.

The amount of any required local match for projects submitted under HSIP Cycle 13 will depend on the countermeasures and funding eligibility established in the applicable Caltrans HSIP guidance. Because the final project packaging, cost estimates, and funding requests will be developed as part of the proposed services, the city's potential local participation cannot be determined at this time. If one or more applications are awarded, the required local share, if any, will be identified and programmed through the Capital Improvement Program as part of future budget actions.

DESCRIPTION GENERAL
LEDGER

ACCOUNT CODES

PROJECT
CODE
AMOUNT ONE TIME or

ONGOING
2026-2027 HSIP Cycle 13
Applications
100-100-150-156-
8600-8601 N/A $64,901 ONE TIME
2026-2027 Total $64,901
FIVE-YEAR STRATEGIC PLAN:

GOAL B: COMMUNITY INVESTMENT
Objective: Cathedral City roads, gateways, public spaces, and other city infrastructure are well planned, designed, constructed, and maintained.

ATTACHMENTS:

1. LRSP Project Map and Improvements description

2. Albert Webb and Associates Proposal

3. Cathedral City Local Road Safety Plan

2026-0356

August 25, 2026

Mr. Armando J. Garcia Baldizzone, PE
City Engineer
City of Cathedral City
68700 Avenida Lalo Guerrero
Cathedral City, CA 92234

RE: HSIP Cycle 13 Grant Applications and Warrant Studies

Dear Armando,

Thank you for the opportunity to submit this proposal to assist the City of Cathedral City with evaluating projects identified in the recently adopted Local Roadway Safety Plan (LRSP) and preparing Highway Safety Improvement Program (HSIP) Cycle 13 grant applications.

Based on the City's LRSP, WEBB proposes to assess the prioritized improvement projects, evaluate their cost and competitiveness for HSIP funding, and prepare and submit the HSIP Cycle 13 applications. In addition, WEBB proposes to conduct traffic control warrant analyses for applicable safety countermeasures to include in the applications. Our approach is intended to help the City maximize funding opportunities while advancing projects that offer the greatest potential safety benefits.

Exhibit A presents our Project Understanding, Exhibit B is the proposed Scope of Work, and Exhibit C provides a summary of our compensation for the services described in Exhibit A. We appreciate the opportunity to support the City in this important effort and look forward to working with you. If you have any questions or require additional information, please feel free to contact me at (951) 686- 1070.

Sincerely,
Albert A. Webb Associates

Nicholas Lowe, PE, TE
Deputy Director

Attachments:

Exhibit “A” – Project Understanding
Exhibit “B” – Scope of Work
Exhibit “C” – Compensation
Armando J. Garcia Baldiizone, PE
City Engineer
Cathedral City
Date:

Approved Task Order for
HSIP Cycle 13 applications
HSIP CYCLE 13 GRANT APPLICATIONS AND WARRANT STUDIE S

Page 2 ends

Exhibit “A” – Project Understanding

The California Department of Transportation (Caltra ns) announced the HSIP Cycle 13 Call for Projects on July 1, 2026, with applications due November 2, 2026. Based on our understanding, the City has already identified the LRSP priority projects it in tends to pursue for HSIP funding. The focus of this effort is not to re-evaluate project priorities, bu t rather to strategically package, optimize, and de velop competitive grant applications that maximize the li kelihood of funding award under HSIP Cycle 13.

Recent HSIP funding cycles have become increasingly competitive, with successful projects generally requiring high Benefit-Cost Ratios (BCRs) to be con sidered for funding. While the minimum funding threshold for Cycle 13 will not be known until appl ications are evaluated, recent funding results and Caltrans HSIP guidance indicate that projects with BCRs above 15.0 are substantially more competitive (the previous cutoff was 12.3). As such, the primar y objective of this effort will be to maximize the safety benefits achieved per dollar invested while ensuring the proposed improvements directly address the documented collision patterns at each l ocation.

To accomplish this, WEBB will perform detailed coll ision analyses for each project location, prepare collision diagrams, identify predominant collision patterns and contributing factors, and evaluate potential countermeasures identified in the LRSP an d the latest Caltrans Local Roadway Safety Manual (LRSM). Multiple countermeasure combinations will be analyzed and refined using the HSIP Analyzer to identify the most effective treatments that provide the greatest safety benefits and strongest BCRs. This iterative process will allow W EBB to strategically package locations and improvements into up to four HSIP applications, opt imizing each application to maximize competitiveness while maintaining cost-effectivenes s and alignment with HSIP requirements.

In addition to preparing the grant applications, WE BB will complete the supporting technical analyses required by HSIP. Based on our current understandin g, two project locations will require traffic signa l warrant evaluations and one project location will r equire an all-way stop warrant analysis. These evaluations will be prepared in accordance with HSI P requirements and included as supporting documentation for the applications.

HSIP CYCLE 13 GRANT APPLICATIONS AND WARRANT STUDIE S

Page 3 ends

Exhibit “B” – Scope of Work

Task 1 – Safety Assessment and Project Optimization
WEBB will review the priority projects identified i n the City's LRSP and subsequently selected by the City for consideration under HSIP Cycle 13. The pur pose of this task is to evaluate and optimize the proposed improvements to maximize safety benefits a nd improve application competitiveness.

a. Obtain and review the most recent five years of available collision data from the Statewide Integrated Traffic Records System (SWITRS).
b. Perform detailed collision analyses for each pro ject location, including identification of predominant collision patterns, collision types, an d contributing factors. c. Prepare collision diagrams exhibits for each pro ject location. Filter out collisions that are not applicable to the intersection.
d. Identify the safety concerns using the City's LR SP and SWITRS data and evaluate applicable countermeasures from the LRSM and HSIP guidance doc uments. e. Review available planning-level cost estimates f rom LRSP and refine the implementation costs for each proposed improvement.
f. Utilize the Caltrans HSIP Analyzer to evaluate p otential countermeasure combinations and calculate preliminary Benefit-Cost Ratios (BCRs).
g. Assess alternatives for combining, separating, r efining, or modifying project locations and countermeasure packages to maximize BCRs and overal l application competitiveness. h. Identify the preferred countermeasure package fo r each application based on safety effectiveness, cost efficiency, and anticipated HSI P competitiveness.

Task 2 – Supporting Traffic Engineering Evaluations
WEBB will perform the technical evaluations require d to support proposed traffic control improvements included in the HSIP applications.
a. Collect traffic volume data at up to three inter sections to support warrant evaluations. Traffic counts to be 12 hours (7AM to 7PM) and include vehi cle, pedestrian, and bicycle activity. b. Conduct traffic signal warrant analyses at up to two intersections in accordance with the California MUTCD and HSIP requirements. If the warr ants are not met, the locations that do not meet them will need to be removed from the appl ication. c. Conduct an all-way stop warrant analysis at one intersection in accordance with the California MUTCD and HSIP requirements.
d. Prepare technical memoranda summarizing the warr ant evaluation findings for inclusion in the HSIP applications.

Task 3 – HSIP Application Development

Based on the results of Tasks 1 and 2, WEBB will pr epare up to four (4) HSIP Cycle 13 grant applications in accordance with current Caltrans HS IP Guidelines.

HSIP CYCLE 13 GRANT APPLICATIONS AND WARRANT STUDIE S

Page 4 ends

a. Develop project narratives describing existing s afety deficiencies, documented collision patterns, and proposed safety improvements.
b. Prepare collision data summaries, collision diag rams, and supporting safety justification exhibits.
c. Develop location-specific countermeasures.
d. Prepare vicinity maps, location maps, and other supporting graphics required for the applications.
e. Develop project cost estimates, funding requests , and implementation schedules. f. Complete HSIP Analyzer documentation and associa ted BCR calculations for each application.
g. Compile and prepare all supporting technical doc umentation required by Caltrans. h. Complete and assemble all required HSIP applicat ion forms and submittal materials.

Task 4 – Project Coordination, Application Refineme nt, Submission

WEBB will coordinate with City staff throughout the application development process to review findings, confirm project priorities, and refine pr oposed countermeasures. a. Conduct up to two (2) coordination meetings with City staff. b. Present preliminary BCR results, recommended pro ject packaging strategies, and proposed countermeasures.
c. Refine and finalize projects, countermeasures, a nd application content based on City input. a. Submit draft applications to the City for review .
b. Incorporate one (1) round of City review comment s and revisions. c. Prepare final application packages and supportin g documentation. d. Assist the City with obtaining required authoriz ations and signatures. e. Submit up to four (4) completed HSIP Cycle 13 ap plications electronically to Caltrans prior to the application deadline of November 2
nd , 2026.

HSIP CYCLE 13 GRANT APPLICATIONS AND WARRANT STUDIE S

Page 5 ends

Exhibit “C” – Compensation
Services described in our Scope of Work (Exhibit “B ”) shall be provided on time and materials basis not to exceed $64,901.00 , itemized as follows:

Item Description
Nicholas R. Lowe,
Principal II
Jaimee Bourgeois,
Principal II
Sara Sadeghi,
Associate III
Son H. Le, Senior I
Cristian Hernandez,
Associate I
Deborah A. Saulina,
Associate I
Total Hours
Subtotal - Labor
AimTD
Total/task
1 Billout Rate 312 $ 312 $ 240 $ 258 $ 217 $ 217 $ Task 1 - Safety Assessment and Project Optimization 6 17 12 40 12 87 20,332 $ - $ 20,332 $

1.1 Obtain, Process, and Review (5 Yrs) SWITRS Data 4 12 16 3,564 $ -$ 3,564 $

1.2 Detailed Collision Analyses 2 8 10 2,544 $ -$ 2,544 $

1.3 Collision Diagram Exhibits 12 40 52 11,776 $ -$ 11,776 $

1.4 Countermeasure Package for Each Application 4 5 9 2,448 $ -$ 2,448 $ Task 2 - Support Traffic Engineering Evaluaction 5 28 2 35 8,070 $ 2,300 $ 10,370 $

2.1 Collect Traffic Volume Data 2 2 434 $ 2,300 $ 2,734 $

2.2 Conduct Traffic Signal Warrant Analyses (2) 2 10 12 2,794 $ -$ 2,794 $

2.3 Conduct an All-Way Stop Warrant (1) 1 2 3 746 $ -$ 746 $

2.4 Prepare Technical Memoranda 2 16 18 4,096 $ -$ 4,096 $ Task 3 - HSIP Application Development (4) 4 14 48 8 32 12 118 28,748 $ - $ 28,748 $

3.1 Develop Project Narratives and Application Base 4 28 32 7,968 $ -$ 7,968 $

3.2 Collision Data Summaries with Countermeasures 12 4 16 3,748 $ -$ 3,748 $

3.3 Prepare Exhibits (Vicinity Maps, Location Maps, Other Supporting Exhibits and Forms) 4 8 32 8 52 11,848 $ - $ 11,848 $

3.4 Cost Estimates 4 6 8 18 5,184 $ - $ 5,184 $
Task 4 - Project Coord. and App. Refinement and Submit 4 6 7 3 20 5,451 $ - $ 5,451 $

4.1 Conduct Coordination Meetings with City (up to 2) 2 2 2 6 1,728 $ -$ 1,728 $

4.2 Project Coordination 2 2 2 6 1,728 $ -$ 1,728 $

4.3 Obtaining Authorization and Signatures 1 1 2 457 $ -$ 457 $

4.4 Finalize Applications and Submit 2 2 2 6 1,538 $ -$ 1,538 $ Total 8 31 72 20 103 26 260 62,601 $ 2,300 $ 64,901 $

1. Rounded to the nearest $1.

JUNE 2026

FINAL REPORT

LOCALROADSAFETYPLAN
Iteris,
Inc. | i
Cathedral City Local Road Safety Plan

ACKNOWLEDGEMENTS
City of Cathedral City Team
Armando J. Garcia Baldizzone, PE – City Engineer
Elizabeth Medina – Engineering Analyst
Carlos Rodriguez – Public Works Supervisor
Safety Partners
Cathedral City Police Department
Dan Anes – Traffic Sargent
Alberto Felix – Traffic Officer
Cathedral City Fire Department
Stephen Tumir – Deputy Fire Chief
Harvey Calderon – Fire Inspector
LRSP Consultant Team
Iteris, Inc.

Deepak Kaushik, PE – Project Manager
Viggen Davidian, PE – Senior Advisor
Sean Daly, AICP – Senior Planner
Bill Zhou, EIT – Associate Engineer
Jin Eo, AICP – Associate Planner

Iteris, Inc. | ii
Cathedral City Local Road Safety Plan

TABLE OF CONTENTS
1) Project Overview ............................................................................................................................. 1 2) Background Review .......................................................................................................... .............. 4

2.1 Local Road Safety Plan ................................................................................................................................ 4

2.2 Engineering and Traffic Survey ................................................................................................................... 5

2.3 Active Transportation Plan ......................................................................................................................... 5

2.4 North City Extended Specific Plan ............................................................................................................... 7 3) Methodology ................................................................................................................ ................... 8

3.1 Stakeholder Engagement ............................................................................................................................ 8

3.2 Safety Analysis ............................................................................................................................................ 8

3.3 Identify and Prioritize Strategies ................................................................................................................ 8

3.4 LRSP Documentation .................................................................................................................................. 9

3.5 Stakeholder Identification and Engagement .............................................................................................. 9

3.6 Use Safety Data ......................................................................................................................................... 10 4) Collision Data analysis .................................................................................................................. 11

4.1 Collision Trends ......................................................................................................................................... 11

4.2 Type of Collisions ...................................................................................................................................... 18

4.3 High Collision Intersections by PCF ........................................................................................................... 18

4.4 High Collision Corridors by Primary Collision Factor ................................................................................. 19

4.5 Driving Under the Influence ...................................................................................................................... 20 5) Demographics ............................................................................................................................... 21

5.1 Population Density .................................................................................................................................... 21

5.2 Household-Income .................................................................................................................................... 21

5.3 Disability Status ......................................................................................................................................... 21 6) Countermeasures ............................................................................................................ ............. 22 7) Countermeasure Identification and Prioritization ........................................................................... 25

7.1 Countermeasure Identification and Evaluation ........................................................................................ 25

7.2 Improvement Project Evaluation: Benefit-to-Cost Analysis ..................................................................... 28 8) Priority Projects ............................................................................................................................. 30

8.1 Project 1: Cathedral City Intersection Safety Program ............................................................................. 30

8.2 Project 2: Ramon Road Safety Improvements .......................................................................................... 30

8.3 Project 3: Date Palm Safety Improvements .............................................................................................. 31

8.4 Project 4: Santoro Drive Bicycle Lanes and Traffic Calming Elements ...................................................... 31

8.5 Project 5: Ramon Road Class IV Separated Bikeway ................................................................................. 31

8.6 Priority Projects Summary ........................................................................................................................ 32

Iteris, Inc. | iii
Cathedral City Local Road Safety Plan
9) Policy and Process Changes ................................................................................................. ....... 36 10) Next Steps ................................................................................................................ .................. 39

TABLES
Table 1: High Collision Intersections by PCF .................................................................................... 19 Table 2: High Collision Corridors by PCF .......................................................................................... 20 Table 3: Proposed Spot Location Improvements .............................................................................. 25 Table 4: Benefit-Cost Ratio Analysis ................................................................................................. 29 Table 5: Project Summary ................................................................................................................. 32 Table 6: Policy Changes for Improved Safety ................................................................................... 37

FIGURES
Figure 1: The Five E’s of Traffic Safety ............................................................................................... 1 Figure 2: Safe System Approach ................................................................................................ ........ 2 Figure 3: Safe System Elements ......................................................................................................... 3 Figure 4: Collision Data Analysis Process ......................................................................................... 10 Figure 6: Total Collision Annual Trend (January 2020 – December 2024) ........................................ 11 Figure 5: Collision Locations ................................................................................................. ............ 12 Figure 7: Annual Collisions by Year and Mode (January 2020 – December 2024) ........................... 13 Figure 8: Collisions by Location and Mode (January 2020 – December 2024) ................................. 13 Figure 9: Fatal and Severe Injury Collisions involving Vulnerable Road Users ................................. 15 Figure 10: Fatal and Severe Injury Collision Locations ..................................................................... 16 Figure 11: Collisions based on Severity Index ................................................................................. . 17 Figure 12: Type of Collisions (January 2020 – December 2024) ...................................................... 18 Figure 13: Countermeasure Locations .............................................................................................. 27 Figure 14: Priority Projects ................................................................................................................ 35

Iteris, Inc. | 1
Cathedral City Local Road Safety Plan
1) PROJECT OVERVIEW
The Local Roadway Safety Plan (LRSP) is a traffic safety planning document developed to proactively address safety needs and challenges in the City of Cathedral City. The document sets forth a comprehensive framework to identify, prior itize, and pursue improvements that mitigate traffic collisions and enhance road safety. By analyzing traffic and collision data alongside Caltrans and Federal Highway Administration (FHWA) guidelines, the LRSP addresses defined needs and will allow eligibility for funding of these improvements in future Caltrans Highway Safety Improvement Program (HSIP) calls-for-projects cycles and other funding sources.

A total of 464 injury collisions were recorded over the past five years of data (2020-2024) resulting in 824 injuries, of which 30 were fatal injuries and 59 were serious, incapacitating injuries. While collisions involving vulnerable users (pedestrians and bicyclists) only accounted for 12 percent of injury collisions (54 of 464 collisions), they accounted for 36 percent of traffic fatalities. The LRSP is particularly focused on safeguarding those at higher risk. The City of Cathedral City’s LRSP includes elements for the Federal Safe Streets and Roads for All Program to allow the City to self- certify its eligibility for Safe Streets for All (SS4A) Implementation grants.

Understanding transportation system safety to prevent life-changing injuries or loss of life is of the utmost importance to the City of Cathedral City, the City prepared this LRSP to facilitate the development of local agency partnerships and collaboration, resulting in a prioritized list of improvements and actions that can demonstrate a defined need and contribute to California’s Strategic Highway Safety Plan (SHSP) overall vision and goals.

The LRSP focuses on reducing
fatal and severe injury collisions
(FSI collisions) with focused
challenge areas adopting the
Five “E’s” of Traffic Safety, as
illustrated in Figure 1 and
summarized on the following
page.

Figure 1: The Five E’s of Traffic Safety

Iteris, Inc. | 2
Cathedral City Local Road Safety Plan

A. Education: Educate all road users on safe behaviors
B. Enforcement: Enforce actions that reduce high-risk behavior C. Engineering: Apply effective and/or innovative countermeasures D. Emergency Response: Improve emergency response times and actions E. Emerging Technologies: Apply emerging technologies to roadway, vehicle, and user

This plan aims to prevent serious injuries and
fatalities on the roads, supporting the US
Department of Transportation's (US DOT)
objective of having no traffic fatalities across
the country. The Safe Systems Approach,
often known as Vision Zero, is the strategy that
the US DOT has chosen to accomplish the
transportation safety objective. Building a
transportation system with the understanding
"humans make mistakes and that humans
have limited ability to tolerate crash impacts" is
the goal of the safe system approach. The
Safe System Approach develops plans to
reduce human mistakes in advance of it happening. Figure 2 shows the principles and elements of the Safe System Approach.

A Safe System Approach provides a safety net for the user by adhering to the following principles:

A. Death/serious injury is unacceptable: While no crashes are desirable, the Safe System Approach prioritizes crashes that result in death and serious injuries, since no one should experience either when using the transportation system.

B. Humans make mistakes: People will inevitably make mistakes that can lead to crashes, but the transportation system can be designed and operated to accommodate human mistakes and injury tolerances and avoid death and serious injuries.

C. Humans are vulnerable: People have limits for tolerating crash forces before death and Figure 2: Safe System Approach

Iteris, Inc. | 3
Cathedral City Local Road Safety Plan
serious injury occurs; therefore, it is critical to design and operate a transportation system that is human-centric and accommodates human vulnerabilities.

D. Responsibility is shared: All stakeholders (transportation system users and managers, vehicle manufacturers, etc.) must ensure that crashes do not lead to fatal or serious injuries.

E. Safety is proactive: Proactive tools should be used to identify and mitigate latent risks in the transportation system, rather than waiting for crashes to occur and reacting afterwards.

F. Redundancy is crucial: Reducing risks requires that all parts of the transportation system are strengthened, so if one part fails, the other parts still protect people.

Achieving a zero-death target requires addressing all accident risk factors using the five components of a safe system, as illustrated in Figure 3.

In addition to supporting the
City's transportation goals, the
plan gives the City the ability to
apply for grants and federal
funding. Specifically, projects
must be included in an approved
safety action plan in order to be
eligible for implementation
money under the SS4A program.

Figure 3: Safe System Elements

Iteris, Inc. | 4
Cathedral City Local Road Safety Plan
2) BACKGROUND REVIEW
In updating the City of Cathedral City’s LRSP, other related transportation planning efforts were reviewed. This section presents key takeaways from multiple documents.

2.1 Local Road Safety Plan
The City of Cathedral City Local Road Safety Plan (LRSP), adopted in June 2021, identified the safety needs and recommended projects to address these needs in the City. The LRSP analyzed crash data, identified infrastructure deficiencies, and provided safety countermeasures for high- risk corridors and intersections. The following is a summary of relevant portions of the LRSP that provides background information for the preparation of the LRSP Update:
• A total of 1,126 collisions were recorded from 2015 to 2019, with 85 crashes resulting in fatal or severe injuries.
o Most common injury and fatality collision types were broadside, rear-end, and head-on.
o Most common primary collision factors were unsafe speed, automobile right-of- way, improper turning, and driving or bicycling under the influence of alcohol or drugs (DUI).
o Motorcycle collisions represented 9% of total fatal collisions and 19% of total severe injury collisions.
o Most common property damage collision types were rear end, hit object, and sideswipe.
• Engineering countermeasures recommended for multiple locations in the City include:
o Intersection LED lighting upgrades
o Pedestrian hybrid beacons (HAWK) installations
o Pedestrian crosswalk upgrades

Iteris, Inc. | 5
Cathedral City Local Road Safety Plan

2.2 Engineering and Traffic Survey
The City of Cathedral City Engineering and Traffic Survey (E&TS), prepared in May 2025, provided the City with a basis for establishment and enforcement of speed limits for selected streets within Cathedral City. A total of 73 locations were surveyed within the City. In establishing the appropriate posted speed limits, the analysis took into consideration CA MUTCD standard, collision history, and other statistical factors such as 85th-percentile speed and 10-mph pace. The following is a summary of relevant portions of the E&TS that provides background information for the preparation of the LRSP Update:
• Most of the surveyed street segments were recommended to remain at their currently established speed limits as documented and would not require any changes to the existing posted regulatory signage or speed limit pavement markings. o Spot radar speed surveys were conducted to determine the prevailing speed of drivers on each of the 73 segment locations during January and February 2025.

The surveys were performed during typical weekdays with a minimum sample size of 100 vehicles.
o 3 out of 73 segments had collision rates that exceeded those of the expected collision rates.

2.3 Active Transportation Plan
The City of Cathedral City Active Transportation Plan (ATP), adopted in February 2023, establishes strategies to improve mobility conditions for pedestrians, bicyclists, and transit riders.

The ATP builds upon local and regional efforts to support active transportation, create safer streets for pedestrians and bicyclists, and conne ct people through infrastructure improvements, with a focus on the most vulnerable users of the roadway. Those active transportation strategies represent citywide and localized improvements to enhance walking, bicycling, and transit conditions for all residents and visitors. The following is a summary of relevant portions of the ATP:

Iteris, Inc. | 6
Cathedral City Local Road Safety Plan
• There are scattered gaps in existing sidewalk network throughout the City, most notably on existing arterials adjoining gated residential communities or adjacent to properties without development. Throughout the City, there are sidewalks in need of repair, which force pedestrians to walk in the street or on uneven surfaces. These circumstances limit the ability of people — particularly people with mobility challenges — to walk in comfort and security.
• There are 29.8 centerline miles of existing bike facilities in the City, with over 44 centerline miles of proposed bikeways and shared-use trails within the City and its sphere of influence.
• Cars were observed not coming to a complete stop at stop signs or stopping in pedestrian walk zones, making it unsafe to cross the street.
• Bicyclists were observed riding on the sidewalk, where dedicated and connected bike lanes were not present. High vehicular volumes and speeds along streets also encourage bicyclists to travel on the sidewalk, which creates conflict points between bicyclists and pedestrians. Bike lanes are often too narrow and not buffered or separated from moving vehicles.
o To improve pedestrian safety and encourage walking, specific improvements can be made based on site-specific issues:
 New and improved sidewalks
 New and improved crosswalks
 New shade
 Leading pedestrian interval
 Traffic calming (bulb-outs, speed cushion, and medians) o To improve bicyclist safety and encourage biking, specific improvements can be made based on the site-specific issues:
 Class I off-street bike path
 Class II striped lane
 Class III bike boulevard
 Class IV protected lane

Iteris, Inc. | 7
Cathedral City Local Road Safety Plan
 Bicycle parking
 Bicycle-friendly intersection
• Safety elements are proposed throughout Cathedral City in major arterials, collectors, streets adjacent to key destinations. Impr oved accessibility and connectivity have shown to add more users to the active transportation system, improve user safety, and allow for greater accommodation for all.

2.4 North City Extended Specific Plan
The overall purpose of the North City Extended Specific Plan, adopted in January 2014, is to establish a development framework that is fully coordinated with the original North City Specific Plan, as an extension of that plan, to facilitate and encourage improvements to help realize the community’s vision for this area. The objectives of this Specific Plan are to:
• Direct the location and intensity of new development
• Guide associated infrastructure and public services
• Balance the provision of job creation and housing opportunities • Implement the conservation criteria es tablished under the Coachella Valley Multiple Species Habitat Conservation Plan (MSHCP) as they may apply to this delineated Specific Plan
• Guide all elements of design for appropriate use in this unique desert environment • Capitalize on the natural resources that exist in this Specific Plan • Encourage sustainable, energy-efficient community development, such as natural scenic vistas
The North City Extended Specific Plan encompasses approximately 590 acres of vacant land located north of Interstate Highway 10 along the Varner Road corridor, and it stretches out to Bob Hope Dr/Rio Del Sol Road on the east and DaVall Dr in the west. The plan could accommodate a unique blend of the following Mixed-Use Development:
• 200,000 square feet of retail/commercial buildings
• 595,000 square feet of restaurants
• 190,000 square feet of office/service buildings

Iteris, Inc. | 8
Cathedral City Local Road Safety Plan
• 595,000 square feet of light industrial
• 400 hotel rooms
• 3,200 residential units
• 240.44 acres of Open Space would be preserved and maintained for use as storm water retention basins, community and neighborhood parks with public recreational facilities, and a network of bikeways, multi-use pathways and pedestrian walkways. 3) METHODOLOGY
The Cathedral City Local Roadway Safety Plan Update focuses on updating and revalidating the LRSP adopted in June 2021. The LRSP update reassesses the local safety needs, analyzes new traffic data and collision data, evaluates the effectiveness of previous countermeasures, and implements safety improvements on local roadwa ys that aligns with the Caltrans SHSP and FHWA guidelines. The LRSP Update will provide the City with a strategic plan for implementation which will strive to reduce fatalities and injuries on local roadways, consistent with the goal of the Caltrans HSIP.

The following items were the primary steps used to create this plan:

3.1 Stakeholder Engagement
City staff identified relevant stakeholders and interested representatives that could have input in the LRSP development process. Key stakeholders included public safety departments, schools, regional partners, and community-based organizations.

3.2 Safety Analysis
Past ten (10) years of collision data was us ed for the analysis. Collision data from January 2015 through December 2024 was used for the analysis.

3.3 Identify and Prioritize Strategies
FHWA Proven Countermeasures and Caltrans sa fety countermeasures were used in mitigating collision trends and risk characteristics. Countermeasures were evaluated for feasibility, cost- effectiveness, and expected safety benefits.

Iteris, Inc. | 9
Cathedral City Local Road Safety Plan

3.4 LRSP Documentation
High priority locations were identified for specific safety improvements. A specific project list based on benefit/cost analysis was developed.

3.5 Stakeholder Identification and Engagement
A project such as this requires establishing the leadership and stakeholders responsible for contributing to the plan. Involving stakeholders in the decision-making process is essential because it enables thoughtful consideration and input from interested parties. Stakeholders can provide insightful thoughts, observations, and relevant viewpoints regarding the needs and performance of the transportation system because they are regular users of local roadways.

Stakeholders may be able to identify important hotspots and safety zones by participating in the LRSP development process.

An established working group with important players from the "5E's" of highway safety, engineering, enforcement, education, emergency response, and emerging technologies—is emphasized as being crucial by the FHWA. During the process, Iteris met twice with representatives from Public Works Departm ent, Police Department, Fire Department, Agua Caliente Band of Cahuilla Indians Planning Department, and Palm Springs Unified School District (PSUSD) to gain feedback on safety concerns. In addition, Iteris presented the draft document to the City Council on May 13, 2026 to gain initial feedback on the plan, which helped inform the final version of the LRSP.

Iteris, Inc. | 10
Cathedral City Local Road Safety Plan

3.6 Use Safety Data
As mentioned, relevant background
information, data and documents were
gathered during the background review and
safety data analysis effort.

Following gathering of the data from the City
and relevant data sources, the data was
collated and organized to locate the City’s
collision “hot spots” or emphasis areas (i.e.
corridors, intersections, etc.).

This analysis narrowed down the data to key emphasis areas which were then analyzed with much finer detail to determine collision causes and other collision factors contributing to the safety of the location. The approach to the data review is illustrated by the simple flowchart shown in Figure 4.

Figure 4: Collision Data Analysis Process

Iteris, Inc. | 11
Cathedral City Local Road Safety Plan
4) COLLISION DATA ANALYSIS
The City of Cathedral City collision data was gathered using collisions from the Statewide Integrated Traffic Records System (SWITRS) collision database. The data set contains five complete years’ worth of collisions spanning from January 2020 through December 2024. During this period, a total of 464 collisions were reported in the City. These collisions were classified based on location: intersection and corridor segment. Figure 5 (on the following page) shows the locations of all intersection collisions.

4.1 Collision Trends
Collision trends in terms of annual magnitude
and severity are presented in this section.

Figures 6 and 7 illustrate the annual collisions in
the City during the data evaluation period by
severity and mode of travel, with the highest
number of collisions recorded in 2023 with 118
crashes totaling 200 victims, including 9 victims
that experienced fatal injury and 20 victims that
experienced severe injury.

There were 32 pedestrian-related and 22 bicycle-
related collisions during the data analysis period,
also known as collisions involving vulnerable road users.

Figure 6: Total Collision Annual Trend (January 2020 – December 2024)

§¨¦10
S
C
A
M
R
E
A
L

SOUTHLAND DR

LA VERNE WAY

S HERMOSA DR

THOMPSON RD

LOS ALAMOS RD

BOB HOPE DR

S EL CIELO RD

E PALM CANYON DR

S PALM CANYON DR

N INDIAN CYN DR

E TAHQUITZ CANYON WA

S SUNRISE WAYS
B
E
LA
R
D
O
R
D

SUNNINGDALE DR

M U R R A Y C A N Y O N D R

B O G E R T T R L

ARABY DR

N AVE CABALLEROS

E TACHEVAH DR

FARRELL DR

E ALEJO RD

N PALM CANYON DR
N
FA
R
R
E
LL
D
R

S BARONA RD

S INDIAN CANYON DR

E RACQUET CLUB RD

FRANK SINATRA DR

EDOMHILLRD

RAMONRD
LANDAU BLVD30TH AVE

GERALD FORD DR

DINAH SHORE DR

CROSSLEY RD

CATHEDRAL CANYON DR

AVE QUINTANA

N GENE AUTRY TRL

AVE MARAVILLA

E MESQUITE AVE

MOUNTAINVIEWRD

TERRACERD

DA VALL DR

PEREZRD

VISCHINO

DATEPALMDR

VARNER RD

VERONA RD

PA L M S P R I N G S

T H O U S A N D

PA L M S

R A N C H O M I R A G E
PA L M

D E S E RT

CAT H E D R A L C I TY

LO CA L R OA DWAY S A F E TY PL A N
0 1 20.5 Miles
N
Figure 5 - Collision Locations

CITY BOUNDARY
16 - 20
11 - 15
6 - 10
2 - 5
1 L E G E N D
# OF TOTAL COLLISIONS

Iteris, Inc. | 13
Cathedral City Local Road Safety Plan
Figure 7: Annual Collisions by Year and Mode (January 2020 – December 2024)

A total of 228 collisions (or 49%) occurred at intersections, a total of 86 collisions (or 19%) occurred near intersections, and a total of 150 collisions (or 32%) occurred at corridors (midblock, driveways or traffic/light poles). For the purpose of categorizing the collisions, a collision was considered to be associated with an intersection if it was recorded within 100 feet of an intersection. Outside of that distance, a collision was considered to be a midblock/corridor-related collision. Figure 8 illustrates collisions by location and mode.

Figure 8: Collisions by Location and Mode (January 2020 – December 2024)

65 66 68
104 107
88 1
9 65 3 4 55
0 20
40 60
80 100
120
2020 2021 2022 2023 2024
Collisions
Motor Vehicle Only Pedestrian Bicycle
272
23 19
138
9 3
0 50
100
150
200
250
300
Motor Vehicle Pedestrian Bicycle
Collisions
At Intersection Not At Intersection

Iteris, Inc. | 14
Cathedral City Local Road Safety Plan
Of the 314 collisions associated with intersections, 23 involved pedestrians and 19 involved bicycles. Of the 150 collisions that occurr ed midblock/on corridors, 9 involved pedestrians and 3 involved bicycles. Figure 9 (on the following page) presents the locations of fatal and severe injury collisions involving vulnerable road users.

In order to help understand where safety countermeasures may be most needed, Figure 10 presents the collision locations in terms of highest severity injury. This measure of severity is further broken down and presented as severity index and shown in Figure 11. Severity index is based on the monetized cost from federal benefit/cost guidance.

§¨¦10
S
C
A
M
R
E
A
L

SOUTHLAND DR

LA VERNE WAY

S HERMOSA DR

THOMPSON RD

LOS ALAMOS RD

BOB HOPE DR

S EL CIELO RD

E PALM CANYON DR

S PALM CANYON DR

N INDIAN CYN DR

E TAHQUITZ CANYON WA

S SUNRISE WAYS
B
E
LA
R
D
O
R
D

SUNNINGDALE DR

M U R R A Y C A N Y O N D R

B O G E R T T R L

ARABY DR

N AVE CABALLEROS

E TACHEVAH DR

FARRELL DR

E ALEJO RD

N PALM CANYON DR
N
FA
R
R
E
LL
D
R

S BARONA RD

S INDIAN CANYON DR

E RACQUET CLUB RD

FRANK SINATRA DR

EDOMHILLRD

RAMONRD
LANDAU BLVD30TH AVE

GERALD FORD DR

DINAH SHORE DR

CROSSLEY RD

CATHEDRAL CANYON DR

AVE QUINTANA

N GENE AUTRY TRL

AVE MARAVILLA

E MESQUITE AVE

MOUNTAINVIEWRD

TERRACERD

DA VALL DR

PEREZRD

VISCHINO

DATEPALMDR

VARNER RD

VERONA RD

PA L M S P R I N G S

T H O U S A N D

PA L M S

R A N C H O M I R A G E
PA L M

D E S E RT

CAT H E D R A L C I TY

LO CA L R OA DWAY S A F E TY PL A N
0 1 20.5 Miles
N
Figure 9 - Fatal and Severe Injury Collisions
involving Vulnerable Road Users

CITY BOUNDARY

L E G E N D
# OF VULNERABLE ROAD USER

FATAL AND SEVERE INJURIES COLLISIONS
3 2
1 0
§¨¦10
S
C
A
M
R
E
A
L

SOUTHLAND DR

LA VERNE WAY

S HERMOSA DR

THOMPSON RD

LOS ALAMOS RD

BOB HOPE DR

S EL CIELO RD

E PALM CANYON DR

S PALM CANYON DR

N INDIAN CYN DR

E TAHQUITZ CANYON WA

S SUNRISE WAYS
B
E
LA
R
D
O
R
D

SUNNINGDALE DR

M U R R A Y C A N Y O N D R

B O G E R T T R L

ARABY DR

N AVE CABALLEROS

E TACHEVAH DR

FARRELL DR

E ALEJO RD

N PALM CANYON DR
N
FA
R
R
E
LL
D
R

S BARONA RD

S INDIAN CANYON DR

E RACQUET CLUB RD

FRANK SINATRA DR

EDOMHILLRD

RAMONRD
LANDAU BLVD30TH AVE

GERALD FORD DR

DINAH SHORE DR

CROSSLEY RD

CATHEDRAL CANYON DR

AVE QUINTANA

N GENE AUTRY TRL

AVE MARAVILLA

E MESQUITE AVE

MOUNTAINVIEWRD

TERRACERD

DA VALL DR

PEREZRD

VISCHINO

DATEPALMDR

VARNER RD

VERONA RD

PA L M S P R I N G S

T H O U S A N D

PA L M S

R A N C H O M I R A G E
PA L M

D E S E RT

CAT H E D R A L C I TY

LO CA L R OA DWAY S A F E TY PL A N
0 1 20.5 Miles
N
Figure 10 - Fatal and Severe Injury Collision Locations

CITY BOUNDARY
5 - 6
3 - 4
2 1
0 L E G E N D
# OF FATAL AND SEVERE INJURIES COLLISIONS
§¨¦10
S
C
A
M
R
E
A
L

SOUTHLAND DR

LA VERNE WAY

S HERMOSA DR

THOMPSON RD

LOS ALAMOS RD

BOB HOPE DR

S EL CIELO RD

E PALM CANYON DR

S PALM CANYON DR

N INDIAN CYN DR

E TAHQUITZ CANYON WA

S SUNRISE WAYS
B
E
LA
R
D
O
R
D

SUNNINGDALE DR

M U R R A Y C A N Y O N D R

B O G E R T T R L

ARABY DR

N AVE CABALLEROS

E TACHEVAH DR

FARRELL DR

E ALEJO RD

N PALM CANYON DR
N
FA
R
R
E
LL
D
R

S BARONA RD

S INDIAN CANYON DR

E RACQUET CLUB RD

FRANK SINATRA DR

EDOMHILLRD

RAMONRD
LANDAU BLVD30TH AVE

GERALD FORD DR

DINAH SHORE DR

CROSSLEY RD

CATHEDRAL CANYON DR

AVE QUINTANA

N GENE AUTRY TRL

AVE MARAVILLA

E MESQUITE AVE

MOUNTAINVIEWRD

TERRACERD

DA VALL DR

PEREZRD

VISCHINO

DATEPALMDR

VARNER RD

VERONA RD

PA L M S P R I N G S

T H O U S A N D

PA L M S

R A N C H O M I R A G E
PA L M

D E S E RT

CAT H E D R A L C I TY

LO CA L R OA DWAY S A F E TY PL A N
0 1 20.5 Miles
N
Figure 11 - Collisions based on Severity Index

CITY BOUNDARY
4 ,001 - 6 , 389
2 ,001 - 4 ,000
1,001 - 2 ,000
501 - 1,000
22 - 500

L E G E N D

SEVERITY INDEX

Iteris, Inc. | 18
Cathedral City Local Road Safety Plan

4.2 Type of Collisions
In addition to the most frequent collision locations, evaluation of the type of collisions helps identify collision patterns and traffic/travel behavior in the City which will lead to effective safety countermeasures. High number of rear-end c ollisions could indicate speeding within the City, whereas high number of broadside collisions could indicate nonadherence to existing traffic control devices, improper turning decisions and/or insufficient traffic signal timing settings.

Sideswipe collisions could be attributed to distracted or aggressive driving, merging and lane switching, and driving under influence.

As illustrated in Figure 12, broadside collisions were the most common type of collisions within the City, followed by rear end collisions and hit object collisions.

Figure 12: Type of Collisions (January 2020 – December 2024)

4.3 High Collision Intersections by PCF
The collision data was further analyzed to identify intersections with the highest number of collisions by primary collision factor (PCF). Table 1 summarizes the 10 intersections with the highest number of collisions citywide between January 2020 and December 2024, along with the most prevalent PCFs at each intersection. This analysis includes collisions that occurred at or near an intersection at a distance less than 100 feet. Appendix A summarizes all collision data by intersection by PCF.

1.1%

3.0%

3.2%

7.3%

8.8%

11.4%

12.3%

17.0%

35.8%

0.0% 5.0% 10.0% 15.0% 20.0% 25.0% 30.0% 35.0% 40.0%
Not Stated
Other
Overturned
Vehicle/Pedestrian
Sideswipe
Head-On
Hit Object
Rear End
Broadside

Iteris, Inc. | 19
Cathedral City Local Road Safety Plan
Unsafe speed, driving or bicycling under the influence of alcohol or drug, and automobile right-of- way were generally the most prevalent causes of collisions at the 10 high-collision intersections.

Table 1: High Collision Intersections by PCF
Intersection Total Injury
Collisions
Fatal + Severe
Injury Collisions Prevalent PCFs
Cathedral Canyon Dr/E
Palm Canyon Dr 17 3
Traffic signals and signs; Driving or bicycling under
the influence of alcohol or drug; Automobile right-of-
way
Note: Current planned improvement project by
City

Cathedral Canyon Dr/Dinah
Shore Dr 16 3
Unsafe speed; Driving or bicycling under the influence
of alcohol or drug
Note: Current planned improvement project by
City

Date Palm Dr/Ramon Road 13 1
Unsafe speed; Automobile right-of-way; Improper
turning; Driving or bicycling under the influence of
alcohol or drug

Date Palm Dr/Vista Chino 13 2 Unsafe speed; Driving or bicycling under the influence of alcohol or drug; Traffic signals and signs

Cathedral Canyon
Dr/Ramon Rd 13 5 Unsafe speed; Driving or bicycling under the influence of alcohol or drug; Automobile right-of-way

Desert Vista Rd/Ramon Rd 12 0 Automobile right-of-way; Traffic signals and signs; Improper turning

Date Palm Dr/Varner Rd 12 6
Unsafe speed; Driving or bicycling under the influence
of alcohol or drug; Improper turning
Note: Current planned improvement project by
City

Landau Blvd/Ramon Rd 12 4
Improper turning; Automobile right-of-way
Note: Current planned improvement project by
City

Canyon Plaza/E Palm
Canyon Dr 10 2 Driving or bicycling under the influence of alcohol or drug; Improper turning

Landau Blvd/Vista Chino 10 2 Driving or bicycling under the influence of alcohol or drug; Automobile right-of-way; Improper turning

As shown, the Cathedral Canyon Drive/East Palm Canyon Drive and Cathedral Canyon Drive/Dinah Shore Drive intersections experienc ed the highest collision frequency over the data collection period.

4.4 High Collision Corridors by Primary Collision Factor Similar to the intersection analysis, the collision data was further analyzed to identify corridors with the highest number of collisions by PCF. This analysis includes collisions that occurred along a corridor at a distance greater than 100 feet from an intersection and collisions with utilities and at driveways. Identifying collisions along the corridor by PCF allows us to recommend corridor- specific countermeasures. Appendix B summarizes all collision data by corridor by PCF.

Iteris, Inc. | 20
Cathedral City Local Road Safety Plan
Table 2 summarizes corridors with the highest number of collisions citywide (greater than ten collisions) between January 2020 and December 2024. Unsafe speed, automobile right-of-way, and driving or bicycling under the influence of alcohol or drug were the most prevalent causes of corridor collisions in the City.

Table 2: High Collision Corridors by PCF
Corridor (City Limits) Total Injury
Collisions F+SI Prevalent PCFs
Date Palm Dr 97 24 Driving or bicycling under the influence of alcohol or drug; Unsafe speed; Traffic signals and signs

Ramon Rd 84 24 Unsafe speed; Automobile right-of-way; Improper Turning East Palm Canyon Dr 70 15 Driving or bicycling under the influence of alcohol or drug; Automobile right-of-way; Improper Turning

Vista Chino 32 5 Automobile right-of-way; Traffic signals and signs; Unsafe speed; Driving or bicycling under the influence of alcohol or drug

Varner Rd 26 5 Unsafe speed; Improper turning
Cathedral Canyon Dr 22 5 Automobile right-of-way; Unsafe speed; Driving or bicycling under the influence of alcohol or drug

Dinah Shore Dr 22 4 Unsafe speed; Traffic signals and signs; Driving or bicycling under the influence of alcohol or drug

4.5 Driving Under the Influence
Review of primary collision factors highlighted a concentration of collisions due to vehicle operators driving under the influence of alcohol or drugs. Citywide, impaired driving was the primary factor in 24 percent of collisions and injuries but involved in 55% of fatal collisions in the City. Most of the impaired driving collisions (63 percent) occurred in three corridors:
• Date Palm Drive – 26 in five years
• Ramon Road – 16 in five years
• East Palm Canyon Drive – 14 in five years

Iteris, Inc. | 21
Cathedral City Local Road Safety Plan
5) DEMOGRAPHICS
Cathedral City will give equitable solutions for road safety priority, considering the higher risk of traffic-related injuries and fatalities that marginalized and underprivileged communities experience. In order to better inform the solutions that will be proposed through the plan, the equity analysis in this chapter provides information on the location and size of marginalized populations. The American Community Survey (ACS) provided the data used in this equity analysis. In order to establish fair solutions, it is imperative to identify groups of concern and solicit public feedback. For example, due to budgetary constraints, low-income groups could need more transportation accommodation. This is especially crucial if a sizable portion of households in this area don't own any vehicles.

5.1 Population Density
The total population of Cathedral City per the 2025 Census estimate was 52,517. The median age range in Cathedral City is 41 to 42 years of age. Around 19 percent of the population is older than 65 years of age. The majority of those 65 years of age and over live in the northern and southern part of the city.

5.2 Household-Income
The median household income in Cathedral City is $73,572 which is 27 percent below the California median household income of $100,149. 13.1 percent of Cathedral City residents are estimated to live in poverty.

5.3 Disability Status

7.4 percent of the population in Cathedral City has some form of disability, with the majority having some form of ambulatory difficulty. 11.1 percent of the population under 65 years old live without health insurance in Cathedral City.

Iteris, Inc. | 22
Cathedral City Local Road Safety Plan
6) COUNTERMEASURES
With the thorough evaluation of available collision data, Iteris has a solid understanding of the most common collision locations, roads, and significant collision trends and issues, along with the hotspots for collisions involving bicycles and pedestrians. In order to accomplish the goal of eradicating collisions resulting in fatalities and serious injuries, countermeasures can be put in place to make roadways safer for all forms of transportation. Physical changes are frequently undertaken to address hazardous intersections, vehicle speeds, and pedestrian and bicyclist safety.

The Local Roadway Safety Manual (April 2024)
1, Highway Safety Improvement Program (HSIP)
Analyzer Manual, April 20242 and Crash Modification Factors (CMF) Clearinghouse3 were utilized in the countermeasure identification process. Additionally, the US Department of Transportation, Federal Highway Administration released a list of twenty-eight proven safety countermeasures 4 that support the goal of eliminating fatalities and serious injuries. These countermeasures were also reviewed during the selection process. C ountermeasures and spot improvements were developed for the identified hotspot locations with a history of collisions within the City.

A list of countermeasures was compiled, separated by types of collisions they can reduce, and sorted by effectiveness in terms of Crash Reduction Factor (CRF). The following is a list of countermeasures grouped with the applicable types of collisions they address and locations (signalized intersections, non-signalized intersections, and roadways). The corresponding countermeasure “code” is provided, where SI = signalized intersection, NS = non-signalized intersection, and R = roadway:

Lights and Night collisions:
• SI01NT/NS01NT: Add intersection lighting, CRF=0.40
• R01NT: Add segment lighting, CRF=0.35

1 Local Roadway Safety Manual, April 2024: https://dot.ca.gov/-/media/dot-media/programs/local- assistance/documents/hsip/2024/lrsm2024-v2.pdf
2 HSIP Analyzer Manual, April 2024: https://dot.ca.gov/-/media/dot-media/programs/local- assistance/documents/hsip/2024/hsip-analyzer-manual-bcr2024.pdf 3 Crash Modification Factors (CMF) Clearinghouse: https://cmfclearinghouse.fhwa.dot.gov 4 Proven Safety Countermeasures, Federal Highway Administration:https://highways.dot.gov/safety/proven-safety- countermeasures

Iteris, Inc. | 23
Cathedral City Local Road Safety Plan

Pedestrian right-of-way and Pedestrian collisions:
• SI03: Improve signal timing, CRF=0.15
• SI21PB: Install advance stop bar before crosswalk, CRF=0.15 • SI22PB: Modify signal phasing to implement a Leading Pedestrian Interval (LPI), CRF=0.60
• R34PB: Install separated bike lanes, CRF=0.45
• R36PB: Install/upgrade pedestrian crossing (with enhanced safety features), CRF=0.35 Following too closely collisions:
• SI02: Improve signal hardware: lenses, back-plate s with retroreflective borders, mounting, size, and number, CRF=0.15
• NS10: Install flashing beacons at stop-controlled intersections, CRF=0.15 Automobile right-of-way collisions:
• SI03: Improve signal timing (coordination, phases, red, yellow, or operation), CRF=0.15 • SI06: Provide protected left turn phase (left turn lane already exists), CRF=0.30 • NS03: Install signals, CRF=0.30
• NS08: Install/upgrade larger or additional stop signs or other intersection warning/regulatory signs, CRF=0.15
• NS13: Improve sight distance to intersection (clear sight triangles), CRF=0.20 • R02: Remove or relocate fixed objects outside of clear recovery zone, CRF=0.35 • R14: Road diet (reduce travel lanes and add a two way left-turn and bike lanes), CRF=0.35 • R22: Install/upgrade signs with new fluorescent sheeting (regulatory or warning), CRF=0.15
Traffic signals and signs collisions (Note that th is factor refers to drivers disregarding traffic signals or signs):
• SI03: Improve signal timing (coordination, phases, red, yellow, or operation), CRF=0.15 • NS08: Install/upgrade larger or additional stop signs or other intersection warning/regulatory signs, CRF=0.15
• R22: Install/upgrade signs with new fluorescent sheeting (regulatory or warning), CRF=0.15

Iteris, Inc. | 24
Cathedral City Local Road Safety Plan
Improper turning collisions:
• SI03: Improve signal timing (coordination, phases, red, yellow, or operation), CRF=0.15 • SI06: Provide protected left turn phase (left turn lane already exists), CRF=0.30 • SI08: Install raised pavement markers and striping (through intersection), CRF=0.10 • SI11: Install raised median on approaches, CRF=0.25
• SI13: Create directional median openings to allow (and restrict) left-turns and U-turns, CRF=0.50
• NS02: Convert to all-way STOP control (from 2-way or yield control), CRF=0.50 • NS08: Install/upgrade larger or additional stop signs or other intersection warning/regulatory signs, CRF=0.15
• NS13: Improve sight distance to intersection (clear sight triangles), CRF=0.20 • NS16: Install raised median on approaches, CRF=0.25
• R08: Install raised median, CRF=0.25
• R14: Road diet (reduce travel lanes and add a two way left-turn and bike lanes), CRF=0.35 Unsafe speed collisions:
• NS02: Convert to all-way STOP control (from 2-way or yield control), CRF=0.50 • NS09: Upgrade intersection pavement markings, CRF=0.25 • R26: Install dynamic/variable speed warning signs, CRF=0.30 • R28: Install edge-lines and centerlines, CRF=0.25
Wrong side of road collisions:
• SI11: Install raised median on approaches, CRF=0.25
• NS16: Install raised median on approaches, CRF=0.25
• R08: Install raised median, CRF=0.25
• R28: Install edge-lines and centerlines, CRF=0.25
Improper passing collisions:
• R28: Install edge-lines and centerlines, CRF=0.25
Driving or bicycling under the influence of alcohol or drug collisions:
• Other: DUI Enforcement, CRF varies

Iteris, Inc. | 25
Cathedral City Local Road Safety Plan
7) COUNTERMEASURE IDENTIFICATION AND

PRIORITIZATION
Upon development of countermeasures for locations in the City of Cathedral City with a history of collisions, projects and their prioritization for implementation of the recommended countermeasures were developed. Prioritization was built on the safety analysis to identify high- risk locations as well as those which will be most effectively addressed by feasible countermeasures and cost effectiveness.

7.1 Countermeasure Identification and Evaluation
The following safety improvement projects were identified based on the recommended countermeasures at the high collision frequency int ersections, whereas a toolkit of applicable countermeasures was identified for high collision frequency corridors.

7.2.1 Identified Countermeasures
Based on the countermeasures’ applicable collision history, a set of safety improvements at the intersections identified as having the highest collision frequency was developed, along with each project’s total effectiveness to reduce collisions (as a percentage of all collisions recorded at that location). Table 3 presents the proposed improvements at 17 locations throughout the City.

Figure 13 presents the locations of each intersection and also denotes locations where the City is currently designing or constructing safety improvements (separate from this LRSP effort).

Table 3: Proposed Spot Location Improvements
ID Intersection Proposed Improvement Project
Collision
Reduction
Effectiveness %
1 Cathedral Canyon Dr/
East Palm Canyon Dr • Update signal timing with protected NB/SB left turn phases 18% 2 Whispering Palms Trail/
Ramon Rd
• Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP Project)
• Prohibit on-street parking along the west side of Whispering Palms Trail, south of Ramon Road
13%
3 Crossley Rd/Ramon Rd • Prohibit on-street parking along the east side of Crossley Road, north of Ramon Road 9%
4 Date Palm Dr/Victoria Dr
• Move westbound stop line closer to the intersection to improve the sight line and improve crosswalk on the east leg • Modify signal phasing to implement a leading pedestrian interval (ATP project)
7%
5 Cathedral Canyon Dr/
33rd Ave
• Convert the intersection from two-way stop control to all-way stop control
• Add street lights in blocks no rth and south of the intersection 50%
6 Date Palm Dr/35th Ave
• Install traffic signal at the int ersection, add protected phasing for southbound left turns
• Add marked crosswalks on the south leg and east leg
37%

Iteris, Inc. | 26
Cathedral City Local Road Safety Plan
ID Intersection Proposed Improvement Project
Collision
Reduction
Effectiveness %
• Add street lights in blocks no rth and south of the intersection 7 Date Palm Dr/Tachevah Dr • Install traffic signal at the int ersection, add protected phasing for northbound left turns 30%
8 Avenida Maravilla-Cathedral
Canyon Dr/Ramon Rd
• Improve the sight line for northbound approach with raised pavement marker and striping
• Install dynamic/variable speed warning signs for the
northbound approach
• Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP project)
17%
9 Landau Blvd/Vista Chino • Install raised median on the west leg and east leg 10% 10 Date Palm Dr/Vista Chino • SBR, EBL improvements, improve signal timing • Install dynamic/variable speed warning signs 13%
11 Date Palm Dr/Ramon Rd
• Update signal timing for more clearance time
• Improve sight line at the north leg for gas station driveway egress movements
• Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP project)
14%
12 East Palm Canyon Dr/
Perez Rd
• Convert the two-way left turn lane (TWLTL) on the west leg to prohibit turns (not raised median for emergency services access)
22%
13 Avenida Del Yermo-Desert
Vista Rd/Ramon Rd
• Modify the intersection to a four-leg signalized intersection, with Avenida Del Yermo being the north leg and Desert Vista Road being the south leg
• Implement split phasing for northbound and southbound movements, add protected phasing for eastbound left turns • Remove raised median on Ramon Road between Avenida
Del Yermo and Desert Vista Road, shift eastbound stop line to the west side of Avenida Del Yermo
• Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP project)
• Traffic signal modifications
35%
14 Mountain View Rd/Varner Rd
• Add “WATCH FOR ONCOMING TRAFFIC” warning sign
• Add guardrail along the northea st corner for westbound right turn movements
7%
15 Date Palm Dr/McCallum Way
• Update signal timing with protected eastbound/westbound left turn phases
• Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP project)
21%
16 San Luis Rey Dr/Mission Dr
• Install dynamic/variable speed warning signs
• Install flashing beacons for the “STOP” sign for all
approaches
15%
17 Santoro Dr/Cypress Rd
• Install Class II bike lane along both sides of Santoro Drive, between 30th Avenue and McCallum Way
• Add bike lane pavement marking
• Convert Two-Way Stop Control to All-Way Stop Control
50%
18 Ramon Rd Bicycle Lanes • Install Class IV Separate Bikeway (ATP project) 55%

§¨¦10
S
C
A
M
R
E
A
L

SOUTHLAND DR

LA VERNE WAY

S HERMOSA DR

THOMPSON RD

LOS ALAMOS RD

BOB HOPE DR

S EL CIELO RD

E PALM CANYON DR

S PALM CANYON DR

N INDIAN CYN DR

E TAHQUITZ CANYON WA

S SUNRISE WAYS
B
E
LA
R
D
O
R
D

SUNNINGDALE DR

M U R R A Y C A N Y O N D R

B O G E R T T R L

ARABY DR

N AVE CABALLEROS

E TACHEVAH DR

FARRELL DR

E ALEJO RD

N PALM CANYON DR
N
FA
R
R
E
LL
D
R

S BARONA RD

S INDIAN CANYON DR

E RACQUET CLUB RD

FRANK SINATRA DR

EDOMHILLRD

RAMONRD
LANDAU BLVD30TH AVE

GERALD FORD DR

DINAH SHORE DR

CROSSLEY RD

CATHEDRAL CANYON DR

AVE QUINTANA

N GENE AUTRY TRL

AVE MARAVILLA

E MESQUITE AVE

MOUNTAINVIEWRD

TERRACERD

DA VALL DR

PEREZRD

VISCHINO

DATEPALMDR

VARNER RD

VERONA RD

PA L M S P R I N G S

T H O U S A N D

PA L M S

R A N C H O M I R A G E
PA L M

D E S E RT
1 4
5 9
12 14
15 16
23 8 1113
6 7
10 17

L E G E N D

LRSP COUNTERMEASURES

CURRENT CITY SAFETY

PROJECT LOCATION

CITY BOUNDARY

CAT H E D R A L C I TY

LO CA L R OA DWAY S A F E TY PL A N
0 1 20.5 Miles
N
Figure 13 - Countermeasure Locations
NOTE: Point labels show proposed improvement location ID #

Iteris, Inc. | 28
Cathedral City Local Road Safety Plan

7.2.2 Systemic Corridor Countermeasures
In the last five years, 61 percent of all injury outcomes occurred in three corridors. Based on analysis of the collision factors and types of coll isions in the corridors, systemic improvements were reviewed:
• Date Palm Drive – high levels of driving under the influence factors (22 percent) and high speeding (20 percent) due to is role as providing regional access to/from Interstate 10 and East Palm Canyon Drive. The Cathedral City Police Department conducts driving under the influence (DUI) checkpoint on a rolling basis, this corridor is a strong candidate for future deployments. Many of the proposed safety countermeasures for spot locations are along Date Palm Drive and include elements which could reduce speeds. Feedback speed signs and programs to encourage lower speeds could also be deployed in the corridor.
• Ramon Road – high levels of speeding (20 percent) and high levels of improper turning/yielding right of way (34 percent) are major factors for collisions in this corridor.

The corridor is characterized by offset intersections where north/south roadways do not meet directly across Ramon Road. The corridor also has several unsignalized left-turns, which must cross three opposing lanes of traffic. Proposed Class IV bicycle lanes and leading pedestrian intervals from the Active Transportation Plan would have a role in improving conditions for walking and biking in the corridor. Spot location improvements recommended as part of this LRSP would also improve overall corridor safety conditions.

The installation of Class IV Bicycle Lanes and LPIs was included as a corridor-wide project based on the Active Transportation Plan recommended project. • East Palm Canyon Drive – high levels of driving under the influence factors (24 percent) and high levels of improper turning/yielding right of way (36 percent) are major factors for collisions in this corridor. There are several current and planned projects to improve medians and intersection in the corridor. Similar to Date Palm Drive, East Palm Canyon Drive is a strong candidate for DUI checkpoints due to its role as a regional connector.

7.2 Improvement Project Evaluation: Benefit-to-Cost Analysis Benefit-Cost Analysis is a standardized methodology for evaluating project effectiveness. The safety benefit for intersections was calculated using USDOT’s Benefit-Cost Analysis Guidance for Discretionary Grant Programs (December 2025) , which outlined the estimated safety cost for fatalities, injuries, and crashes.

Iteris, Inc. | 29
Cathedral City Local Road Safety Plan
KABCO level indicates the seriousness of collisions, with K being the highest (killed), followed by serious/incapacitating injuries, visible injuries, and complaint of pain. The collision reduction factor for each countermeasure was applied to each location’s collision history to evaluate its effectiveness in reducing injuries from those collisions.

The costs of improvements were based on unit costs in 2026 dollars. These unit costs were escalated by 150 percent to account for project development, mobilization, soft costs, and contingency. The result of comparing these two monetized values is a Benefit-Cost Ratio (BCR).

For the purposes of this report, the BCR was used for comparison purposes. A more advanced version of the calculation, which involves year of expenditure and future benefit periods, is used in federal grant applications where a BCR greater than 1.0 indicates the safety benefit cost outweighs the construction cost for proposed countermeasures and an BCR less than 1.0 indicates the construction cost outweighs the safety benefit cost.

Table 4 summarizes the results of the benefit-to-cost analysis.

Table 4: Benefit-Cost Ratio Analysis
ID Location Collision Reduction
Benefit (Five Year) Cost
Estimate
B/C
Ratio
1 Cathedral Canyon Dr/East Palm Canyon Dr $ 10,897,229 $ 500,000 21.8 2 Whispering Palms Trail/Ramon Rd $ 2,724,907 $ 25,500 106.9 3 Crossley Rd/Ramon Rd $ 3,395,740 $ 14,500 234.2
4 Date Palm Dr/Victoria Dr $ 2,592,980 $ 22,500 115.2
5 Cathedral Canyon Dr/33rd Ave $ 12,249,889 $ 610,586 20.1 6 Date Palm Dr/35th Ave $ 8,707,629 $ 2,645,126 3.3
7 Date Palm Dr/Tachevah Dr $ 13,400,258 $ 2,000,000 6.7 8 Avenida Maravilla-Cathedral Canyon Dr/Ramon Rd $ 10,793,486 $ 160,000 67.5 9 Vista Chino/Landau Blvd $ 8,373,412 $ 281,250 29.8
10 Date Palm Dr/Vista Chino $ 19,653,633 $ 97,500 201.6 11 Date Palm Dr/Ramon Rd $ 3,794,062 $ 56,306 67.4
12 East Palm Canyon Dr/Perez Rd $ 4,587,487 $ 187,500 24.5 13 Avenida Del Yermo-Desert Vista Rd/Ramon Rd $ 1,130,116 $ 1,557,500 0.7 14 Mountain View Rd/Varner Rd $ 1,328,273 $ 26,495 50.1 15 Date Palm Dr/McCallum Way $ 1,554,470 $ 517,500 3.0 16 San Luis Rey Dr/Mission Dr $ 498,327 $ 387,252 1.3 17 Santoro Dr/Cypress Rd $ - $ 212,920 -
* Ramon Rd Improvements (Class IV Bicycle Lanes) $ 35,911,923 $ 3,437,500 10.4 *Note that the Ramon Road Corridor Improvements for the installation of Class IV Bicycle Lanes and LPIs does not double count improvements by Ramon Road spot location improvements.

Iteris, Inc. | 30
Cathedral City Local Road Safety Plan
8) PRIORITY PROJECTS
The identified safety countermeasures for locations identified in Section 7 were consolidated into recommended implementation projects. Five individual projects were identified:
• Project 1: Cathedral City Intersection Safety Program • Project 2: Ramon Road Safety Improvements
• Project 3: Date Palm Safety Improvements
• Project 4: Santoro Drive Bicycle Lanes and Traffic Calming Elements • Project 5: Ramon Road Class IV Separated Bikeway
Projects 1, 2, and 3 are recommended for HSIP applications due to their collision history and expected safety benefits. Projects 4 and 5 could be funded under the HSIP bicycle safety set- aside or an Active Transportation Program (ATP) grant.

8.1 Project 1: Cathedral City Intersection Safety Program The Cathedral City Intersection Safety Program is composed of improvements to eight locations in the City. The safety goals of the project are to improve conditions for vehicles and vulnerable users based on collision history and factors experienced at project locations. The project cost estimate is $2.5 million. Based on the previous five-year collision history and the safety countermeasures of the project, there is an ex pected reduction in collisions of 2.1 per year resulting in a reduction of 0.1 fatal or severe injuries and 0.6 other injuries per year. These benefits are monetized to $42.1 million, resulting in a benefit-cost ratio of 16.6 per the Cycle 12 HSIP Analyzer tool.

8.2 Project 2: Ramon Road Safety Improvements
The Ramon Road Safety Improvements is composed of improvements to five intersections. The safety goals of the project are to improve conditions for vulnerable users and improve intersection conditions at off-set intersection locations. The project cost estimate is $1.8 million. Based on the previous five-year collision history and the safety countermeasures of the project, there is an expected reduction in collisions of 2.0 per year resulting in a reduction of 0.1 fatal or severe injuries and 0.4 other injuries per year. These b enefits are monetized to $21.8 million, resulting in a benefit-cost ratio of 12.0 per the Cycle 12 HSIP Analyzer tool.

Iteris, Inc. | 31
Cathedral City Local Road Safety Plan

8.3 Project 3: Date Palm Safety Improvements
The Date Palm Safety Improvements is composed of improvements to three locations. The safety goals of the project are to address high speeds, unprotected left-turns, and poor lighting in the corridor. The project cost estimate is $4.7 million. Based on the previous five-year collision history and the safety countermeasures of the project, there is an expected reduction in collisions of 0.6 per year resulting in a reduction of 0.1 fatal or severe injuries and 0.1 other injuries per year.

These benefits are monetized to $41.8 million, resulting in a benefit-cost ratio of 8.8 per the Cycle 12 HSIP Analyzer tool.

8.4 Project 4: Santoro Drive Bicycle Lanes and Traffic Calming Elements The Santoro Drive Bicycle Lanes and Traffic Calming Elements is composed of a comprehensive bicycle mobility and speed reduction pr ogram from McCallum Way to 30 th Avenue with connections to James Workman Middle School. The goals of the project are to improve conditions for vulnerable users and reduce vehicle speeds in the corridor while providing an improved, safe bicycle route to school. The project cost estimate is $213,000. While the study area does not have an extensive reported collision history, speeding in the corridor was identified as a major issue in stakeholder engagement. This project is a candidate for the bicycle safety set-aside of $350,000 per community, which was included in the HSIP Cycle 12. This set-aside did not require a BCR value. If the bicycle safety set-aside is not included in future Cycles of HSIP, it is a candidate for an ATP grant.

8.5 Project 5: Ramon Road Class IV Separated Bikeway
The Ramon Road Class IV Separated Bikeway is composed of corridor-wide protected bicycle lanes. The safety goals of the project are to improve conditions for vulnerable users. The project cost estimate is $3.4 million. Based on the previous five-year collision history and the safety countermeasures of the project, there is an ex pected reduction in collisions of 1.9 per year resulting in a reduction of 0.1 fatal or severe injuries and 0.3 other injuries per year. These benefits are monetized to $35.9 million, resulting in a benefit -cost ratio of 10.4 per the Cycle 12 HSIP Analyzer tool.

Appendix C presents conceptual improvement plan “cut sheets” for the five projects.

Appendix D provides cost estimate worksheets for each project.

Iteris, Inc. | 32
Cathedral City Local Road Safety Plan

8.6 Priority Projects Summary
The priority projects are summarized in Table 5 below.

Table 5: Project Summary
ID Project Countermeasures Benefit Cost B/C Ratio
Project 1 Cathedral City Intersection
Safety Program Eight Projects: $42,082,067 $2,533,083 16.6 1A Cathedral Canyon Dr/East Palm
Canyon Dr Update signal timing with protected NB/SB left turn phases $10,897,229 $500,000 21.8 1B Date Palm Dr/Victoria Dr
Move westbound stop line closer to the intersection to
improve the sight line and improve crosswalk on the east leg
Modify signal phasing to implement a leading pedestrian interval (ATP project)
$2,592,980 $22,500 115.2
1C Cathedral Canyon Dr/33rd Avenue
Convert the intersection from two-way stop control to all- way stop control
Add street lights in blocks north and south of the
intersection
$12,249,889 $610,586 20.1
1D Vista Chino/Landau Blvd Install raised median on the west leg and east leg $8,373,412 $281,250 29.8 1E East Palm Canyon Dr/Perez Rd
Convert the two-way left turn lane (TWLTL) on the west
leg to prohibit turns (not raised median for emergency
services access)
$4,587,487 $187,500 24.5
1F Mountain View Rd/Varner Rd
Add “WATCH FOR ONCOMING TRAFFIC” warning sign
Add guardrail along the northeast corner for westbound
right turn movements
$1,328,273 $26,495 50.1
1G Date Palm Dr/McCallum Way
Update signal timing with protected eastbound/westbound left turn phases
Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP project)
$1,554,470 $517,500 3.0
1H San Luis Rey Dr/Mission Dr
Install dynamic/variable speed warning signs
Install flashing beacons for the “STOP” sign for all
approaches
$498,327 $387,252 1.3

Iteris, Inc. | 33
Cathedral City Local Road Safety Plan

ID Project Countermeasures Benefit Cost B/C Ratio
Project 2 Ramon Road Safety
Improvements Five Locations: $21,838,311 $1,813,806 12.0 2A Whispering Palms Trail/Ramon Rd
Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP Project)
Prohibit on-street parking along the west side of
Whispering Palms Trail, south of Ramon Road
$2,724,907 $25,500 106.9
2B Crossley Rd/Ramon Rd Prohibit on-street parking along the east side of Crossley Road, north of Ramon Road $3,395,740 $14,500 234.2
2C Avenida Maravilla-Cathedral
Canyon Dr/Ramon Rd
Improve the sight line for northbound approach with raised pavement marker and striping
Install dynamic/variable speed warning signs for the
northbound approach
Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP project)
$10,793,486 $160,000 67.5
2D Date Palm Dr/Ramon Rd
Update signal timing for more clearance time
Improve sight line at the north leg for gas station driveway egress movements
Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP project)
$3,794,062 $56,306 67.4
2E Avenida Del Yermo-Desert Vista
Rd/Ramon Rd
Modify the intersection to a four-leg signalized intersection, with Avenida Del Yermo being the north leg and Desert
Vista Road being the south leg
Implement split phasing for northbound and southbound
movements, add protected phasing for eastbound left
turns
Remove raised median on Ramon Road between Avenida
Del Yermo and Desert Vista Road, shift eastbound stop
line to the west side of Avenida Del Yermo
Modify signal phasing to implement a leading pedestrian interval (LPI) (ATP project)
Traffic signal modifications
$1,130,116 $1,557,500 0.7

Iteris, Inc. | 34
Cathedral City Local Road Safety Plan

ID Project Countermeasures Benefit Cost B/C Ratio
Project 3 Date Palm Safety Improvements Three Projects: $41,761,520 $4,742,626 8.8 3A Date Palm Dr/35th Ave
Install traffic signal at the intersection, add protected phasing for southbound left turns
Add marked crosswalks on the south leg and east leg
Add street lights in blocks north and south of the
intersection
$8,707,629 $2,645,126 3.3
3B Date Palm Dr/Tachevah Dr Install traffic signal at the intersection, add protected phasing for northbound left turns $13,400,258 $2,000,000 6.7 3C Date Palm Dr/Vista Chino SBR, EBL improvements, improve signal timing Install dynamic/variable speed warning signs $19,653,633 $97,500 201.6 Project 4 Santoro Drive Bicycle Lanes and
Traffic Calming Elements
Install Class II bike lane along both sides of Santoro
Dr, between 30th Ave and McCallum Way
Add bike lane pavement marking
Convert Two-Way Stop Control to All-Way Stop
Control
- $212,920 -
Project 5 Ramon Rd Class IV Separated
Bikeway Install Class IV Separated Bikeway (ATP project) $35,911,923 $3,437,500 10.4

The priority projects are shown in Figure 14.
§¨¦10
S
C
A
M
R
E
A
L

SOUTHLAND DR

LA VERNE WAY

S HERMOSA DR

THOMPSON RD

LOS ALAMOS RD

BOB HOPE DR

S EL CIELO RD

E PALM CANYON DR

S PALM CANYON DR

N INDIAN CYN DR

E TAHQUITZ CANYON WA

S SUNRISE WAYS
B
E
LA
R
D
O
R
D

SUNNINGDALE DR

M U R R A Y C A N Y O N D R

B O G E R T T R L

ARABY DR

N AVE CABALLEROS

E TACHEVAH DR

FARRELL DR

E ALEJO RD

N PALM CANYON DR
N
FA
R
R
E
LL
D
R

S BARONA RD

S INDIAN CANYON DR

E RACQUET CLUB RD

FRANK SINATRA DR

EDOMHILLRD

RAMONRD
LANDAU BLVD30TH AVE

GERALD FORD DR

DINAH SHORE DR

CROSSLEY RD

CATHEDRAL CANYON DR

AVE QUINTANA

N GENE AUTRY TRL

AVE MARAVILLA

E MESQUITE AVE

MOUNTAINVIEWRD

TERRACERD

DA VALL DR

PEREZRD

VISCHINO

DATEPALMDR

VARNER RD

VERONA RD

PA L M S P R I N G S

T H O U S A N D

PA L M S

R A N C H O M I R A G E
PA L M

D E S E RT
1 4
5 9
12 14
15 16
23 8 1113
6 7
10 17

CAT H E D R A L C I TY

LO CA L R OA DWAY S A F E TY PL A N
0 1 20.5 Miles
N
Figure 14 - Priority Projects
NOTE: Point labels show proposed improvement location ID #

CITY BOUNDARY
#5 RAMON RD CLASS IV SEPARATED BIKEWAY
#4 SANTORO BIKE LANES & TRAFFIC CALMING
#3 DATE PALM SAFETY IMPROVEMENTS
#2 RAMON RD SAFETY IMPROVEMENTS
#1 INTERSECTION SAFETY PROGRAM

L E G E N D

Iteris, Inc. | 36
Cathedral City Local Road Safety Plan
9) POLICY AND PROCESS CHANGES
In addition to physical improvements,
policy and process changes are
considered, which include
assessment of current policies,
plans, guidelines, and/or standards
(i.e., manuals) to identify
opportunities to improve how
processes prioritize transportation
safety. A list of potential policies
developed by the National Highway
Traffic Safety Administration to
improve safety conditions as specific
countermeasures for the City to consider
are shown in Table 6, including each policy’s potential effectiveness and rough cost range (low, medium, or high) which are described after the table.

Iteris, Inc. | 37
Cathedral City Local Road Safety Plan
Table 6: Policy Changes for Improved Safety
Policy Based
Countermeasure
Category
Countermeasure Effectiveness
(1 to 5)
Cost
($ to $$$)
Alcohol-Impaired
Driving
Publicized Sobriety Checkpoints 5 $$$
High-Visibility Saturation Patrols 4 $$
Drug-Impaired Driving Enforcement of Drug-Impaired Driving 3 $$ Seat Belt and Child
Restraints
Short-Term, High-Visibility Seat Belt Law Enforcement 5 $$$ Sustained Seat Belt Enforcement 3 Varies
Speeding and Speed
Management
Lower Speed Limits 5 $
Speed Safety Camera Enforcement 5 Varies
High-Visibility Enforcement 5 $$$
Distracted Driving High-Visibility Cell Phone Enforcement 4 $$$ Motorcycle Safety
Motorcycle Rider Training 2 $$
Strategies to Increase Rider Conspicuity and Use of
Protective Clothing 1 Varies
Alcohol-Impaired Motorcyclists: Detection,
Enforcement, and Sanctions 3 Varies
Young Drivers
Enforcement of Graduated Driver Licensing (GDL) 2 $
Hazard Perception Training 2 Varies
Pedestrian Safety
Lower Speed Limits 4 $
High-Visibility Enforcement at Pedestrian Crossings 3 $$ Pedestrian Safety Zones 4 $$$
Elementary-Age Child Pedestrian Training 3 $
Safe Routes to School 3 $
Bicycle Safety
Promote Bicycle Helmet Use with Education 3 $$$
Safe Routes to School 3 $
Bicycle Safety Education for Children 2 $
Cycling Skills Clinics, Bike Fairs, Bike Rodeos 1 $
Source: National Highway Traffic Safety Administration Countermeasures That Work.

Iteris, Inc. | 38
Cathedral City Local Road Safety Plan
The evaluation metrics mentioned in Table 6 are described as follows:

Effectiveness:
• 5: Demonstrated to be effective by several high-quality evaluations with consistent results. • 4: Demonstrated to be effective in certain situations. • 3: Likely to be effective based on balance of evidence from high-quality evaluations. • 2: Limited evaluation evidence, but adheres to principles of human behavior and may be effective if implemented well.
• 1: No evaluation evidence, but adheres to principles of human behavior and may be effective if implemented well.

Cost to implement:
• $$$ Requires extensive new facilities, staff, equipment, or publicity, or makes heavy demands on current resources.
• $$ Requires some additional staff time, equipment, facilities, and/or publicity. • $ Can be implemented with current staff, perhaps with training; limited costs for equipment or facilities.

Given that this report is an LRSP, a Leadership Commitment and Goal Setting component is not formally required at this time. However, this commitment will be required as part of a future Safety Action Plan (SAP). This is an official public commi tment (i.e., resolution, policy, ordinance) by a high ranking official and/or governing body (i.e., Mayor or City Council) to an eventual goal of zero roadway fatalities and serious injuries. The commitment must include a goal and timeline for eliminating roadway fatalities and serious injuries achieved through one, or both, of the following:

1. The target date for achieving zero roadway fatalities and serious injuries, or

2. A percentage reduction of roadway fatalities and serious injuries by a specific date with an eventual goal of eliminating roadway fatalities and serious injuries.

Iteris, Inc. | 39
Cathedral City Local Road Safety Plan
10) NEXT STEPS
For the next five years, the City's needs for road safety will be guided by this living comprehensive safety action plan. The objectives will be tracked and updated as necessary. While longer-term, more expensive projects will be included in the Cathedral City Capital Improvement Program (CIP), low-cost, easily implemented projects will be given priority for implementation within the City. Comprehending the forthcoming funding opportunities is crucial for the effective execution of these safety initiatives. The majority of the suggested countermeasures would likely be funded by HSIP. Countermeasures, however, can be put into place using other financing sources, such as:

1. The ATP, or Active Transportation Program

2. The program for Congestion Mitigation and Air Quality (CMAQ)

3. Sustainable Communities' Sustainable Transportation Planning Grant

4. Sources of stimulus financing

5. Capital Improvement Program (CIP)

TECHNICAL

APPENDICES

LOCALROADSAFETYPLAN

Iteris, Inc. | Appendix A
Cathedral City Local Road Safety Plan
APPENDIX A – INTERSECTION COLLISION PCF
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 21 22 23 24 - Unknown
Driving Or
Bicycling
Under
Influence Of
Alcohol Or
Drug
Impeding
Traffic Unsafe SpeedFollowing Too
Closely
Wrong Side Of
Road
Improper
Passing
Unsafe Lane
Change
Improper
Turning
Automobile
Right-Of-Way
Pedestrian
Right-Of-Way
Pedestrian
Violation
Traffic Signals
And Signs
Hazardous
Parking Lights Brakes Other
Equipment
Other
Hazardous
Violation
Other Than
Driver
Unsafe
Starting Or
Backing
Other
Improper
Driving
Pedestrian or
"Other" Under
the Influence
of Alcohol or
Drug
Fell Asleep NOT STATED
1 RAMON RD DATE PALM DR - 2 - 3 - - - - 2 3 - 1 1 - - - - - - - - - - - 13 2 E PALM CANYON DR CANYON PLZ 1 3 - 1 - - - - 3 - 1 1 - - - - - - - - - - - - 10 3 RAMON RD CROSSLEY RD - - - - - - - - - 5 - 1 1 - - - - - - - - - - - 7 4 E PALM CANYON DR PEREZ RD - - - 2 1 - - - 2 4 - - - - - - - - - - - - - - 9 5 RAMON RD DESERT VISTA RD - - - 1 - - - - 2 4 - - 3 - - - - 1 1 - - - - - 12 6 DATE PALM DR VARNER RD 1 3 - 3 - 1 - - 3 - - - 1 - - - - - - - - - - - 12 7 DATE PALM DR VISTA CHINO - 4 - 5 - - - - - 1 - - 2 - - - - - - - - - - - 13 8 VISTA CHINO AVENIDA QUINTANA - - - 1 - 1 - 1 1 1 - - 3 - - - - - - - - - - - 8 9 DATE PALM DR VICTORIA DR - 1 - 1 - - - - - - - 1 2 - - - - - - - - - - - 5 10LANDAU BL RAMON RD 1 1 - 1 - - - 1 4 2 1 1 - - - - - - - - - - - - 12 11VARNER RD MOUNTAIN VIEW RD - - - 3 - - - - 3 1 - - - - - - - - - - - - - - 7 12LANDAU BL VISTA CHINO - 3 - - 1 - - - 2 3 - - 1 - - - - - - - - - - - 10 13CATHEDRAL CANYON DR E PALM CANYON DR - 3 - 2 - - - - 1 3 1 1 6 - - - - - - - - - - - 17 14RAMON RD CATHEDRAL CANYON DR - 4 - 5 - - - - 1 2 - - 1 - - - - - - - - - - - 13 15RAMON RD WHISPERING PALMS TR - 3 - 2 - - - - - - 1 1 2 - - - - - - - - - - - 9 16CATHEDRAL CANYON DR DINAH SHORE DR - 3 - 6 - - - - 1 2 - - 2 - - - - 1 1 - - - - - 16 17DATE PALM DR MCCALLUM WY - 1 - 1 - - - - - - 1 - 3 - - - - - - - - - - - 7 18VARNER RD EDOM HILL RD - 2 - 4 - - - - 1 - - - - - - - - - - - - - - - 7 19VISTA CHINO HORIZON RD - - - 1 - - - - - 3 - - - - - - - - - - 1 - - - 5 20DATE PALM DR 30TH AV - - - 2 - - - - - - - - 2 - - - - - - - - - - - 4 21RAMON RD DA VALL DR - 1 - - - - - - 3 1 - - - - - - - - - - - - - - 5 22DATE PALM DR BARISTO RD 1 2 - 1 - - - - 1 - 1 - 2 - - - - - - - - - - - 8 23DATE PALM DR DINAH SHORE DR - 1 - - - - - - 4 - - 1 - - - - - - - - - - - - 6 24E PALM CANYON DR MELROSE DR - 2 - - - - - - - 2 - - - - - - - - - - - - - - 4 25PALM DR PAUL RD - 2 - 1 - - - - 1 - - - 1 - - - - - - - - - - - 5 26CATHEDRAL CANYON DR 33RD AV - - - 1 - - - - - 2 - - - - - - - - - - - - - - 3 27DATE PALM DR CONVERSE RD - - - - - - - - - 2 - - - - - - - - - - - - - - 2 28E PALM CANYON DR DATE PALM DR - 3 - 3 - - - - - - - - 1 - - - - - - - - - - - 7 29LANDAU BL MCCALLUM WY - 2 - - - - - - - 2 1 - - - - - - - - - - - - - 5 30RAMON RD CATHEDRAL VILLAGE E - - - - - - - - - - - - 2 - - - - - - - - - - - 3 31E PALM CANYON DR CREE RD - 1 - - - - - - 2 1 - 1 - - - - - - - - - - - - 5 32VISTA CHINO AVENIDA MARAVILLA - - - 1 - - - - - - - - 1 - - - - - - - 1 - - - 3 33CATHEDRAL CANYON DR ORTEGA RD - 1 - - - - - - - 4 - - - - - - - - - - - - - - 5 34CATHEDRAL CANYON DR PEREZ RD - - - - - - - - 1 - - - 1 - - - - - - - - - - - 2 35DATE PALM DR TACHEVAH DR - - - 1 - - - - - - - - - - - - - - - - - - - - 1 36E PALM CANYON DR E PALM CANYON DR - - - - - - - - - 1 - - - - - - - - - - - - - - 1 37RAMON RD NEUMA DR - - - 2 - - - - 2 - - 1 - - - - - - - - - - - - 5 38VISTA CHINO AVENIDA LA PAZ - - - - - - - - - 2 - - - - - - - - - - - - - - 2 39DATE PALM DR BUDDY ROGERS AV - 1 - - - 1 - - - - - - 2 - - - - - - - - - - - 4 40DATE PALM DR DAVE KELLEY RD - 2 - 2 - - - - - 1 1 - 2 - - - - - - - - - - - 8 41DATE PALM DR GERALD FORD DR - - - - - - - - - - - - - - - - - - 1 - - - - - 1 42DATE PALM DR MARKET PL - - - - - - - - - - - - 1 - - - - - - - - - - - 1 43DATE PALM DR TORTUGA RD - - - 1 - - - - 1 2 - - - - - - - - - - - - - - 4 44DATE PALM DR CATHEDRAL VILLAGE E - 1 - 1 1 - - - 1 - - - 1 - - - - - - - - - - - 5 45SAN LUIS REY DR MISSION DR - - - 2 - - - - 1 1 - - - - - - - - - - - - - - 4 46CATHEDRAL CANYON DR CORRAL RD - 1 - - - - - - - 1 - - - - - - - - - 1 - - - - 3 47DATE PALM DR 35TH AV - 2 - - - - - - - 1 - - - - - - - - - - - - - - 3 48DATE PALM DR I-10 - 1 - - - - - - 1 1 - - - - - - - - - - - - - - 3 49DATE PALM DR VIA ESTRADA - - - - - 1 - - - 2 - - - - - - - - - - - - - - 3 50E PALM CANYON DR ALLEN AV - 1 - 1 - - - - 1 - - - - - - - - - - - - - - - 3 51E PALM CANYON DR AUTO PARK DR - 1 - - - - - - - - - - - - - 1 - - - - - - - - 2 52E PALM CANYON DR OFFICER JERMAINE GIBSON AV - - - - - - - 1 - - - - - - - - - - - - - - - - 1 53DA VALL DR GERALD FORD DR 2 1 - - - - - - - - - - - - - - - - - - - - - - 4 54PALM DR VARNER RD - - - 2 - - 1 - - 1 - - - - - - - - - - - - - - 4 55DATE PALM DR PEREZ RD - 1 - 1 - - - - - - - - - - - - - - - - - - - - 3 56RAMON RD CANDLEWOOD DR 1 1 - - - - - - - 1 - - - - - - - - - - - - - - 3 57SHIFTING SANDS TR MISSION INDIAN TR - - - - - - - - - - - - 2 - - - - - - - - - - - 2 58VARNER RD BOB HOPE DR 1 - - 1 - - - - 1 - - - - - - - - - - - - - - - 3 59CARMELA DR VISTA CHINO - 1 - - - - - - - - - - - - - - - - - - - - - - 2 60DATE PALM DR ADELINA RD - - - - - - - - 1 1 - - - - - - - - - - - - - - 2 Grand
TotalInt ID CROSS STREET A CROSS STREET B
Intersection Analysis by Primary Collision Factor (Violation Category) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 21 22 23 24 - Unknown
Driving Or
Bicycling
Under
Influence Of
Alcohol Or
Drug
Impeding
Traffic Unsafe SpeedFollowing Too
Closely
Wrong Side Of
Road
Improper
Passing
Unsafe Lane
Change
Improper
Turning
Automobile
Right-Of-Way
Pedestrian
Right-Of-Way
Pedestrian
Violation
Traffic Signals
And Signs
Hazardous
Parking Lights Brakes Other
Equipment
Other
Hazardous
Violation
Other Than
Driver
Unsafe
Starting Or
Backing
Other
Improper
Driving
Pedestrian or
"Other" Under
the Influence
of Alcohol or
Drug
Fell Asleep NOT STATED
Grand
TotalInt ID CROSS STREET A CROSS STREET B
Intersection Analysis by Primary Collision Factor (Violation Category) 61DATE PALM DR CORRAL RD - - - 1 - - - - - - - - - - - - - - - - - - - - 1 62DATE PALM DR LOS GATOS RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 63DINAH SHORE DR VAQUERO RD - 1 - - - - - - - - - - - - - - - - - - - - - - 1 64DINAH SHORE DR VIA DE ANZA - - - - - - - - - - - - 1 - - - - - - - - - - - 1 65E PALM CANYON DR GOLF CLUB DR - 1 - - - - - - - - - - - - - - - - - - - - - - 2 66E PALM CANYON DR W BUDDY ROGERS AV - - - 1 - - - - - 1 - - - - - - - - - - - - - - 2 67GERALD FORD DR PLUMLEY RD - - - - - - - - - 1 - - 1 - - - - - - - - - - - 2 68LANDAU BL 30TH AV - 1 - - - - - - - - - - - - - - - - - - - - - - 1 69BARISTO RD LANDAU BL - - - - - 1 - - 1 - - - - - - - - - - - - - - - 2 70LANDAU BL TACHEVAH DR - - - 1 - - - - - - - - - - - - - - - - - - - - 1 71RAMON RD AVENIDA ALVERA - - - 1 - - - - - 1 - 2 - - - - - - - - - - - - 4 72RAMON RD AVENIDA EL MUNDO - - - 1 - - - - - - - 1 - - - - - - - - - - - - 2 73RAMON RD SAN ELJAY AV - 1 - 1 - - - - - - - - - - - - - - - - - - - - 2 74RAMON RD SAN LUIS REY DR - - - 1 - - - - - - - - - - - - - - - - - - - - 1 75RAMON RD VIA CAMPANILE - - - 1 1 - - - - - - - - - - - - - - - - - - - 2 76AVENIDA LA PAZ 30TH AV - - - 1 - - - - 1 - - - - - - - - - - - - - - - 2 7730TH AV SAN ELJAY AV - - - 1 - - - - - - - - - - - - - - - - - - - - 1 78AVENIDA LA GAVIOTA BARISTO RD - - - 1 - - - - - - - - - - - - - - - - - - - - 1 79BARISTO RD AVENIDA JUAREZ - 1 - - - - - - - 1 - - - - - - - - - - - - - - 2 80CORRAL RD MONTE VISTA RD - 1 - - - - - - 1 - - - - - - - - - - - - - - - 2 81DATE PALM DR 33RD AV - - - - - - - - - 1 - - - - - - - - - - - - - - 1 82DATE PALM DR EYTEL RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 83DINAH SHORE DR DA VALL DR - - - - - - - - - - - - 2 - - - - - - - - - - - 2 84DINAH SHORE DR PLUMLEY RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 85DINAH SHORE DR VIA ALTAMIRA - - - - - - - - 1 1 - - - - - - - - - - - - - - 2 86E PALM CANYON DR MONTY HALL DR - - - - 1 - - - 1 - - - 1 - - - - - - - - - - - 4 87E PALM CANYON DR PALO VERDE DR - 1 - - - - - - - - - - - - - - - - - - - - - - 1 88E PALM CANYON DR SUNGATE WY - - - - - - - - 1 - - - 1 - - - - - - - - - - - 2 89LANDAU BL DESERT PRINCESS DR - - - 1 - - - - - - - - - - - - - - - - - - - - 1 90LANDAU BL VEGA RD - 1 - - - - - - - - - - - - - - - - - - - - - - 1 91MCCALLUM WY SAN ELJAY AV - 1 - 1 - - - - - - - - - - - - - - - - - - - - 2 92PEREZ RD CAMPBELL ST - - - - - - - - - - - - - - - - - - - - - - - - 1 93PLAZA DR PEREZ RD - - - - - - - - 1 - - - - - - - - - - - - - - - 1 94RAMON RD AVENIDA EL PUEBLO - - - - - - - - - - - - - - - - - - 1 - - - - - 1 95RAMON RD AVENIDA XIMINO - - - - - - - - - 1 - - - - - - - - - - - - - - 1 96RAMON RD MEMORIAL DR - - - - - - - - 1 - - - - - - - - - - - - - - - 1 97SAN ANTONIO DR SAN JOSE DR - - - 1 - - - - 1 - - - - - - - - - - - - - - - 2 9833RD AV SHIFTING SANDS TR - 1 - - - - - - 1 - - - - - - - - - 1 - - - - - 3 99VICTORIA DR EAGLE CANYON DR - 1 - - - - - - - - - - - - - - - - - - - - - - 1 100WHISPERING PALMS TR MCCALLUM WY - 1 - - - - - - - - - - - - - - - - - - - - - - 1 10133RD AV WISHING WELL TR - - - - - - - - - 1 - - - - - - - - - - - - - - 1 10230TH AV ALEXANDER DR - - - - - - - - - 1 - - - - - - - - - - - - - - 1 10333RD AV CAMPUS LN - - - - - - - - - 1 - - - - - - - - - - - - - - 1 10434603 PLUMLEY RD VICTORIA DR - - - - - - - - - - - - - - - - - - - - 1 - - - 1 10535TH AV CORREGIDOR DR - - - - - - - - 1 - - - - - - - - - - - - - - - 1 106AURORA VISTA RD RAMON RD - - - - - - - - - - - - - - - - - - - - - - - - 1 107AVENIDA DEL YERMO ALISO RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 108AVENIDA LA PAZ SANTELMO RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 109AVENIDA LA VISTA CONCEPCION RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 110AVENIDA MARAVILLA JOAQUINE WY - 1 - - - - - - - - - - - - - - - - - - - - - - 1 111AVENIDA MARAVILLA TORTUGA RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 112AVENIDA QUINTANA VERONA RD - - - - - - - - - - - - - - - - - - - - - - - - 1 113BANKSIDE DR COMMERCIAL RD 1 - - - - - - - - - - - - - - - - - - - - - - - 1 114BARISTO RD AVENIDA EL MUNDO - - - - - 1 - - - - - - - - - - - - - - - - - - 1 115BARISTO RD AVENIDA EL PUEBLO - - - - - - 1 - - - - - - - - - - - - - - - - - 1 116BOB HOPE DR I-10 1 - - - - - - - - - - - - - - - - - - - - - - - 1 117CATHEDRAL CANYON DR CALLE TRUJILLO - - - 1 - - - - - - - - - - - - - - - - - - - - 1 118CATHEDRAL CANYON DR OFFICER DAVID VASQUEZ RD - - - - - - - - - - - - 1 - - - - - - - - - - - 1 119CONVERSE RD CORREGIDOR DR 1 - - - - - - - - - - - - - - - - - - - - - - - 1 120CORRAL RD AURORA VISTA RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 21 22 23 24 - Unknown
Driving Or
Bicycling
Under
Influence Of
Alcohol Or
Drug
Impeding
Traffic Unsafe SpeedFollowing Too
Closely
Wrong Side Of
Road
Improper
Passing
Unsafe Lane
Change
Improper
Turning
Automobile
Right-Of-Way
Pedestrian
Right-Of-Way
Pedestrian
Violation
Traffic Signals
And Signs
Hazardous
Parking Lights Brakes Other
Equipment
Other
Hazardous
Violation
Other Than
Driver
Unsafe
Starting Or
Backing
Other
Improper
Driving
Pedestrian or
"Other" Under
the Influence
of Alcohol or
Drug
Fell Asleep NOT STATED
Grand
TotalInt ID CROSS STREET A CROSS STREET B
Intersection Analysis by Primary Collision Factor (Violation Category) 121CORRAL RD NAVAJO TR - - - 1 - - - - - - - - - - - - - - - - - - - - 1 122CORRAL RD RANCHO VISTA DR - - - - - - - - - - 1 - - - - - - - - - - - - - 1 123CORREGIDOR DR DINAH SHORE DR - - - - - - - - - - 1 - - - - - - - - - - - - - 1 124DA VALL DR SUNNY LN - - - - - - - - 1 - - - - - - - - - - - - - - - 1 125DATE PALM DR 2113857E - - - 1 - - - - - - - - - - - - - - - - - - - - 1 126DATE PALM DR EDISON POLE #2207518E - 1 - - - - - - - - - - - - - - - - - - - - - - 1 127DATE PALM DR POLE# 2113856E - - - 1 - - - - - - - - - - - - - - - - - - - - 1 128DINAH SHORE DR EDISON POLE #4290039E - - - 1 - - - - - - - - - - - - - - - - - - - - 1 129E PALM CANYON DR MARGOT MURPHY WAY - - - - - - - - 1 - - - - - - - - - - - - - - - 1 130E ST F ST - - - - - - - - 1 - - - - - - - - - - - - - - - 1 131RAMON RD EL TORO RD - - - - - - - - 1 - - - 1 - - - - - - - - - - - 2 132HORIZON RD PANORAMA RD - 1 - - - - - - - - - - - - - - - - - - - - - - 1 133KATHY DR VICKI LN - 1 - - - - - - - - - - - - - - - - - - - - - - 1 134MCCALLUM WY AVENIDA ALVERA - - - - - - - - - - - - 1 - - - - - - - - - - - 1 135MISSION DR MISSION DR - 1 - - - - - - - - - - - - - - - - - - - - - - 1 136NORTH PALM CANYON DR VIA OLIVERA - - - - - - - - 1 - - - - - - - - - - - - - - - 1 137ORTEGA RD PUEBLO TR - 1 - - - - - - - - - - - - - - - - - - - - - - 1 138PASADA RD VALENCIA ST - 1 - - - - - - - - - - - - - - - - - - - - - - 1 139PLAZA DR PLAZA DR - - - - - - - - - - - - - - - - - - - - - - - - 1 140PUEBLO TR 33RD AV - - - - - - - - - 1 - - - - - - - - - - - - - - 1 141QUIJO RD ABRIL DR - - - - - - - - 1 - - - - - - - - - - - - - - - 1 142RAMON RD AVENIDA VALDEZ - - - - - - - - - - - 1 - - - - - - - - - - - - 1 143RAMON RD DESERT VIEW RD - - - - - - - - - - - - 1 - - - - - - - - - - - 1 144RAMON RD RATTLER RD - - - - - - - - 1 - - - - - - - - - - - - - - - 1 145RAMON RD SHIFTING SANDS TR - - - - - - - - - - 1 - - - - - - - - - - - - - 1 146RIO VISTA DR RIO COLORADO RD - - - 1 - - - - - - - - - - - - - - - - - - - - 1 147ROCHESTER RD FLORAL GROVE - - - - - - - - 1 - - - - - - - - - - - - - - - 1 148SAN ELJAY AV DORAL WY - - - - - 1 - - - - - - - - - - - - - - - - - - 1 149SANTIAGO RD VALENCIA ST - - - 1 - - - - - - - - - - - - - - - - - - - - 1 150SANTORO DR 30TH AV - - - - - - - - - - 1 - - - - - - - - - - - - - 1 151SANTORO DR CYPRESS RD - - - - - - - - - - - - 1 - - - - - - - - - - - 1 152SANTORO DR TORTUGA RD - 1 - - - - - - - - - - - - - - - - - - - - - - 1 153SARAH ST CROSSLEY RD - - - - - - - - - - - 1 - - - - - - - - - - - - 1 154VAQUERO RD 35TH AV - 1 - - - - - - - - - - - - - - - - - - - - - - 1 155VARDON CT BOB HOPE DR - - - 1 - - - - - - - - - - - - - - - - - - - - 1 156VARNER RD EDISON POLE #16320E - - - - - - - 1 - - - - - - - - - - - - - - - - 1 157VARNER RD EDISON POLE 1632223E - - - - - - - - 1 - - - - - - - - - - - - - - - 1 158VARNER RD EDISON POLE 4629849E - - - - - 1 - - - - - - - - - - - - - - - - - - 1 159VERONA RD NORTADA DR - - - - - - - - 1 - - - - - - - - - - - - - - - 1 160VIA DE ANZA CEDAR RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 161VICTORIA DR MARCIA RD - - - - - - - - 1 - - - - - - - - - - - - - - - 1 162VISTA CHINO AVENIDA TERRAZO - - - - - 1 - - - - - - - - - - - - - - - - - - 1 163VISTA CHINO VAL YERMO TR - - - - - 1 - - - - - - - - - - - - - - - - - - 1 164WHISPERING PALMS TR CORTA RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 11 83 - 87 5 10 2 4 69 84 12 15 57 - - 1 - 2 5 1 3 - - - 464Grand Total

Iteris, Inc. | Appendix B
Cathedral City Local Road Safety Plan
APPENDIX B – CORRIDOR COLLISION PCF
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 21 22 23 24 - Unknown
Driving Or
Bicycling
Under
Influence Of
Alcohol Or
Drug
Impeding
Traffic Unsafe SpeedFollowing Too
Closely
Wrong Side Of
Road
Improper
Passing
Unsafe Lane
Change
Improper
Turning
Automobile
Right-Of-Way
Pedestrian
Right-Of-Way
Pedestrian
Violation
Traffic Signals
And Signs
Hazardous
Parking Lights Brakes Other
Equipment
Other
Hazardous
Violation
Other Than
Driver
Unsafe
Starting Or
Backing
Other
Improper
Driving
Pedestrian or
"Other" Under
the Influence
of Alcohol or
Drug
Fell Asleep NOT STATED
1 DATE PALM DR 1 18 - 19 1 3 - - 10 16 3 3 17 - - - - - 1 - - - - - 94 2 RAMON RD 1 10 - 12 1 - - 1 13 14 2 8 10 - - - - 1 1 - - - - - 75 3 E PALM CANYON DR 1 16 - 8 2 - - 1 12 9 1 3 5 - - 1 - - - - - - - - 61 4 CROSSLEY RD - - - - - - - - - - - - 1 - - - - - - - - - - - 1 5 DESERT VISTA RD - - - - - - - - - 1 - - - - - - - - - - - - - - 1 6 AVENIDA DEL YERMO - - - - - - - - - 1 - - - - - - - - 1 - - - - - 2 7 VARNER RD 2 3 - 10 - 1 - 1 7 1 - - 1 - - - - - - - - - - - 26 8 VISTA CHINO - 3 - 5 1 3 - 1 1 9 - - 5 - - - - - - - 2 - - - 31 9 LANDAU BL - 6 - 2 - 1 - - 4 2 2 - - - - - - - - - - - - - 17 10 CATHEDRAL CANYON DR- 2 - 7 - - - - - 13 1 - 6 - - - - 1 1 1 - - - - 32 11 AVENIDA MARAVILLA - 1 - - - - - - - 2 - - - - - - - - - - - - - - 3 12 WHISPERING PALMS TR - 3 - 1 - - - - - 1 - - 1 - - - - - - - - - - - 6 13 DINAH SHORE DR - 4 - 5 - - - - 3 2 - - 5 - - - - - - - - - - - 19 14 PALM DR - 2 - 2 - - 1 - 1 1 - - 1 - - - - - - - - - - - 8 15 ORTEGA RD - 3 - - - - - - - 1 - - - - - - - - - - - - - - 4 16 PEREZ RD - - - 1 - - - - 1 - - - - - - - - - - - - - - - 4 17 NEUMA DR - - - 1 - - - - - - - - - - - - - - - - - - - - 1 18 DAVE KELLEY RD - - - 1 - - - - - - - - - - - - - - - - - - - - 1 19 TORTUGA RD - - - 1 - - - - - - - - - - - - - - - - - - - - 1 20 VIA OLIVERA - - - - - - - - 1 - - - - - - - - - - - - - - - 1 21 SAN LUIS REY DR - - - 2 - - - - 1 1 - - - - - - - - - - - - - - 4 22 DA VALL DR 1 - - - - - - - 1 - - - - - - - - - - - - - - - 2 23 GERALD FORD DR 1 1 - - - - - - - 1 - - 1 - - - - - - - - - - - 5 24 CANDLEWOOD DR 1 - - - - - - - - - - - - - - - - - - - - - - - 1 25 SHIFTING SANDS TR - 1 - - - - - - - - - - 2 - - - - - 1 - - - - - 4 26 CARMELA DR - - - - - - - - - - - - - - - - - - - - - - - - 1 27 BARISTO RD - 1 - - - 1 1 - 1 1 - - - - - - - - - - - - - - 5 28 SAN ELJAY AV - - - 1 - 1 - - - - - - - - - - - - - - - - - - 2 29 AVENIDA LA PAZ - - - 1 - - - - - 1 - - - - - - - - - - - - - - 2 30 30TH AV - - - 1 - - - - 1 1 - - - - - - - - - - - - - - 3 31 AVENIDA LA GAVIOTA - - - 1 - - - - - - - - - - - - - - - - - - - - 1 32 CORRAL RD - 1 - 1 - - - - 1 1 1 - - - - - - - - - - - - - 5 33 MCCALLUM WY - 1 - 1 - - - - - - - - 1 - - - - - - - - - - - 3 34 PLAZA DR - - - - - - - - 1 - - - - - - - - - - - - - - - 2 35 SAN ANTONIO DR - - - 1 - - - - 1 - - - - - - - - - - - - - - - 2 36 33RD AV - - - - - - - - 1 2 - - - - - - - - - - - - - - 3 37 VICTORIA DR - 1 - - - - - - 1 - - - - - - - - - - - - - - - 2 38 34603 PLUMLEY RD - - - - - - - - - - - - - - - - - - - - 1 - - - 1 39 35TH AV - - - - - - - - 1 - - - - - - - - - - - - - - - 1 40 AURORA VISTA RD - - - - - - - - - - - - - - - - - - - - - - - - 1 41 AVENIDA LA VISTA - - - - - - - - - 1 - - - - - - - - - - - - - - 1 42 AVENIDA QUINTANA - - - - - - - - - - - - - - - - - - - - - - - - 1 43 BANKSIDE DR 1 - - - - - - - - - - - - - - - - - - - - - - - 1 44 BOB HOPE DR 1 - - - - - - - - - - - - - - - - - - - - - - - 1 45 CONVERSE RD 1 - - - - - - - - - - - - - - - - - - - - - - - 1 46 CORREGIDOR DR - - - - - - - - - - 1 - - - - - - - - - - - - - 1 47 E ST - - - - - - - - 1 - - - - - - - - - - - - - - - 1 48 EL TORO RD - - - - - - - - 1 - - - - - - - - - - - - - - - 1 49 HORIZON RD - 1 - - - - - - - - - - - - - - - - - - - - - - 1 50 KATHY DR - 1 - - - - - - - - - - - - - - - - - - - - - - 1 Grand
Total
Corridor Analysis by Primary Collision Factor (Violation Category) Corridor#
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 21 22 23 24 - Unknown
Driving Or
Bicycling
Under
Influence Of
Alcohol Or
Drug
Impeding
Traffic Unsafe SpeedFollowing Too
Closely
Wrong Side Of
Road
Improper
Passing
Unsafe Lane
Change
Improper
Turning
Automobile
Right-Of-Way
Pedestrian
Right-Of-Way
Pedestrian
Violation
Traffic Signals
And Signs
Hazardous
Parking Lights Brakes Other
Equipment
Other
Hazardous
Violation
Other Than
Driver
Unsafe
Starting Or
Backing
Other
Improper
Driving
Pedestrian or
"Other" Under
the Influence
of Alcohol or
Drug
Fell Asleep NOT STATED
Grand
Total
Corridor Analysis by Primary Collision Factor (Violation Category) Corridor#
51 MISSION DR - 1 - - - - - - - - - - - - - - - - - - - - - - 1 52 NORTH PALM CANYON DR- - - - - - - - 1 - - - - - - - - - - - - - - - 1 53 PASADA RD - 1 - - - - - - - - - - - - - - - - - - - - - - 1 54 PUEBLO TR - - - - - - - - - 1 - - - - - - - - - - - - - - 1 55 QUIJO RD - - - - - - - - 1 - - - - - - - - - - - - - - - 1 56 RIO VISTA DR - - - 1 - - - - - - - - - - - - - - - - - - - - 1 57 ROCHESTER RD - - - - - - - - 1 - - - - - - - - - - - - - - - 1 58 SANTIAGO RD - - - 1 - - - - - - - - - - - - - - - - - - - - 1 59 SANTORO DR - 1 - - - - - - - - 1 - 1 - - - - - - - - - - - 3 60 SARAH ST - - - - - - - - - - - 1 - - - - - - - - - - - - 1 61 VAQUERO RD - 1 - - - - - - - - - - - - - - - - - - - - - - 1 62 VARDON CT - - - 1 - - - - - - - - - - - - - - - - - - - - 1 63 VERONA RD - - - - - - - - 1 - - - - - - - - - - - - - - - 1 64 VIA DE ANZA - - - - - - - - - 1 - - - - - - - - - - - - - - 1 11 83 - 87 5 10 2 4 69 84 12 15 57 - - 1 - 2 5 1 3 - - - 464Grand Total

Iteris, Inc. | Appendix C
Cathedral City Local Road Safety Plan

APPENDIX C – PROJECT CONCEPTUAL

LOCATION IMPROVEMENT PLAN SHEETS

Cathedral City Local Road Safety Plan
PROJECT 1 – CATHEDRAL CITY INTERSECTION

SAFETY PROGRAM
Cathedral Canyon Drive/East Palm Canyon Drive
Cathedral City Intersection Safety Program
Project 1-A
Update signal timing with protected northbound/southbound left-turn phases
Recommended Improvements:
1 Automobile Right-of-Way (3 collisions)
D.U.I (3 collisions)
Traffic Signals and Signs (6 collisions)
Primary Collision Factor:

Complaint of Pain: 14
Other Visible Injury: 4
Severe Injury: 2
Fatal Injury: 1
17 Collisions from January 2020 to December 2024
1 City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Cathedral Canyon Dr
East P
alm Cany
on Dr
Date Palm Drive/Victoria Drive
Cathedral City Intersection Safety Program
Project 1-B
2 Move westbound stop line closer to the intersection
to improve the sight line and improve crosswalk on the east leg Recommended Improvements:
1 2
1 Traffic Signals and Signs (2 collisions)
Primary Collision Factor:

Complaint of Pain: 5
Other Visible Injury: 2
Severe Injury: 1
Fatal Injury: 1
5 Collisions from January 2020 to December 2024
Move westbound stop line and crosswalk closer to the intersection Modify signal phasing to implement a leading pedestrian interval (LPI)
City of Cathedral City
Local Roadway Safety Plan

NOT TO SCALE
Victoria Dr
Cathedral Canyon Drive/33rd Avenue
Cathedral City Intersection Safety Program
Project 1-C
Add intersection lighting2
Convert the intersection from Two-Way Stop
Control to All-Way Stop Control1
Recommended Improvements:
22 22
1 Automobile Right-of-Way (2 collisions)
Primary Collision Factor:

Complaint of Pain: 4
Other Visible Injury: 1
Severe Injury: 1
Fatal Injury: 1
3 Collisions from January 2020 to December 2024
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Cathedral Canyon Dr
33rd Ave
Vista Chino/Landau Boulevard
Cathedral City Intersection Safety Program
Project 1-D
Install raised median on the west leg and east leg1
Recommended Improvements:

Install raised median1
Install raised median1
Improper Turning (2 collisions)
D.U.I (3 collisions)
Automobile Right-of-Way (3 collisions)
Primary Collision Factor:

Complaint of Pain: 11
Other Visible Injury: 6
Severe Injury: 2
Fatal Injury: 0
10 Collisions from January 2020 to December 2024
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Landau Blvd
Vista Chino
East Palm Canyon Drive/Perez Road
Cathedral City Intersection Safety Program
Project 1-E
Convert the two-way left turn lane (TWLTL) on the west leg to prohibit turns (not raised median for emergency services access) 1 Recommended Improvements:
1 Improper Turning (2 collisions)
Unsafe Speed (2 collisions)
Automobile Right-of-Way (4 collisions)
Primary Collision Factor:

Complaint of Pain: 6
Other Visible Injury: 4
Severe Injury: 1
Fatal Injury: 0
9 Collisions from January 2020 to December 2024
Prohibit turns in the center median
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Perez Road
East Palm Canyon Drive
Varner Road/Mountain View Road
Cathedral City Intersection Safety Program
Project 1-F
Add guardrail along the northeast corner for westbound
right turn movements
2 Add “WATCH FOR ONCOMING TRAFFIC” warning sign1
Recommended Improvements:

Improper Turning (3 collisions)
Unsafe Speed (3 collisions)
Primary Collision Factor:

Complaint of Pain: 6
Other Visible Injury: 3
Severe Injury: 0
Fatal Injury: 0
7 Collisions from January 2020 to December 2024
2 2
1 City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Varner Rd
Mountain View R
d
Date Palm Drive/McCallum Way
Cathedral City Intersection Safety Program
Project 1-G
Modify signal phasing to implement a leading pedestrian interval (LPI)
2 Update signal timing with protected eastbound/westbound left turn phases
1 Recommended Improvements:
2 1
1 Traffic Signals and Signs (3 collisions)
Primary Collision Factor:

Complaint of Pain: 7
Other Visible Injury: 1
Severe Injury: 0
Fatal Injury: 0
7 Collisions from January 2020 to December 2024
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Date Palm Dr
McCallum Way
San Luis Rey Drive/Mission Drive
Cathedral City Intersection Safety Program
Project 1-H
Install flashing beacons for the “STOP” sign for all approaches2 Install dynamic/variable speed warning signs1
Recommended Improvements:
2 2
2 2
1 1
1 1
Unsafe Speed (2 collisions)
Primary Collision Factor:

Complaint of Pain: 4
Other Visible Injury: 1
Severe Injury: 0
Fatal Injury: 0
4 Collisions from January 2020 to December 2024
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
San Luis Rey Drive
Mission Drive
Cathedral City Local Road Safety Plan
PROJECT 2 – RAMON ROAD SAFETY

IMPROVEMENTS
Ramon Road/Whispering Palms Trail
Ramon Road Safety Improvements
Project 2-A
Prohibit on-street parking along the west side of Whispering Palms Trail, south of Ramon Road
2 Modify signal phasing to implement a leading pedestrian interval (LPI)1 Recommended Improvements:
2 1
Unsafe Speed (2 collisions)
Traffic Signals and Signs (2 collisions)
D.U.I (3 collisions)
Primary Collision Factor:

Complaint of Pain: 10
Other Visible Injury: 4
Severe Injury: 1
Fatal Injury: 1
9 Collisions from January 2020 to December 2024
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Whispering Palms Trail
Ramon Rd
Ramon Road/Crossley Road
Ramon Road Safety Improvements
Project 2-B
Prohibit on-street parking along the east side of Crossley Road, north of Ramon Road
1 Recommended Improvements:

Automobile Right-of-Way (5 collisions)
Primary Collision Factor:

Complaint of Pain: 7
Other Visible Injury: 4
Severe Injury: 1
Fatal Injury: 1
7 Collisions from January 2020 to December 2024
Prohibit parking along the east side of Crossley Road1
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Crossley Rd
Ramon Rd
Ramon Road/Cathedral Canyon Drive/Avenida Maravilla
Ramon Road Safety Improvements
Project 2-C
Modify signal phasing to implement a leading
pedestrian interval (LPI)
3 Install dynamic/variable speed warning signs for the
northbound approach
2 Improve the sight line for northbound approach with
raised pavement marker and striping
1 Recommended Improvements:
3 2
1 Automobile Right-of-Way (2 collisions)
D.U.I (4 collisions)
Unsafe Speed (5 collisions)
Primary Collision Factor:

Complaint of Pain: 17
Other Visible Injury: 3
Severe Injury: 5
Fatal Injury: 0
13 Collisions from January 2020 to December 2024
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Cathedral Canyon Drive
Ramon Road
Avenida
Maravilla
Ramon Road/Date Palm Drive
Ramon Road Safety Improvements
Project 2-D
Modify signal phasing to implement a leading pedestrian interval (LPI)
Improve sight line at the north leg for gas station
driveway egress movements
Update signal timing for more clearance time
Recommended Improvements:
3 2
1 Improper Turning (2 collisions)
Unsafe Speed (3 collisions)
Automobile Right-of-Way (3 collisions)
Primary Collision Factor:

Complaint of Pain: 12
Other Visible Injury: 5
Severe Injury: 1
Fatal Injury: 0
13 Collisions from January 2020 to December 2024
3 2
1 City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Date Palm Dr
Ramon Rd
Ramon Road/Desert Vista Road/Avenida Del Yermo
Ramon Road Safety Improvements
Project 2-E
Traffic Signal Modifications
Modify signal phasing to implement a leading pedestrian interval (LPI)
Remove raised median on Ramon Road between
Avenida Del Yermo and Desert Vista Road, shift eastbound stop line to the west side of Avenida Del Yermo
Implement split phasing for northbound and southbound
movements, add protected phasing for eastbound left turns Modify the intersection to a four-leg signalized intersection, with Avenida Del Yermo being the north leg and
Desert Vista Road being the south leg
Recommended Improvements:
5 4
3 2
1 Automobile Right-of-Way (4 collisions)
Primary Collision Factor:

Complaint of Pain: 12
Other Visible Injury: 2
Severe Injury: 0
Fatal Injury: 0
12 Collisions from January 2020 to December 2024
Add protected left turn phasing
Remove raised median
5 4
4 3
2 2
1 Traffic Signal and Signs (3 collisions)
Improper Turning (2 collisions)
City of Cathedral City
Local Roadway Safety Plan

NOT TO SCALE
Ramon Rd
Cathedral City Local Road Safety Plan
PROJECT 3 – DATE PALM SAFETY

IMPROVEMENTS
Date Palm Drive/35th Avenue
Date Palm Safety Improvements
Project 3-A
Add street lights in blocks north and south of the intersection3 Add marked crosswalks on the south leg and east leg2
Install traffic signal at the intersection, add protected phasing for southbound left turns
1 Recommended Improvements:
3 33
3 2
1 D.U.I (2 collisions)
Primary Collision Factor:

Complaint of Pain: 2
Other Visible Injury: 0
Severe Injury: 0
Fatal Injury: 1
3 Collisions from January 2020 to December 2024
Add marked crosswalk on the south leg and east leg
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Date Palm Dr
35th Avenue
Date Palm Drive/Tachevah Drive
Date Palm Safety Improvements
Project 3-B
Install traffic signal at the intersection, add
protected phasing for northbound left turns
Recommended Improvements:
1 1
D.U.I., Unsafe Speed (2 collisions)
Primary Collision Factor:

Complaint of Pain: 3
Other Visible Injury: 0
Severe Injury: 1
Fatal Injury: 2
6 Collisions from January 2016 to December 2020*
* 2016 to 2020 timeframe was used to assess safety trends at this location City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Date Palm Dr
Tachevah Dr
Date Palm Drive/Vista Chino
Date Palm Safety Improvements
Project 3-C
Install dynamic/variable speed warning signs2
Improve signal timing for EBL/SBR movement1
Recommended Improvements:
2 2
1 Traffic Signals and Signs (2 collisions)
D.U.I (4 collisions)
Unsafe Speed (5 collisions)
Primary Collision Factor:

Complaint of Pain: 8
Other Visible Injury: 6
Severe Injury: 2
Fatal Injury: 0
13 Collisions from January 2020 to December 2024
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Date Palm Dr
Vista Chino
Cathedral City Local Road Safety Plan
PROJECT 4 – SANTORO DRIVE BICYCLE LANES

AND TRAFFIC CALMING ELEMENTS
Santoro Drive/Cypress Road
Santoro Drive Bicycle Lanes and Traffic Calming Elements Project 4
Include traffic calming elements for signing and striping4 Convert Two-Way Stop Control to All-Way Stop Control3
Add bike lane pavement marking2
Install Class II bike lane along both sides of Santoro Drive, between 30th Avenue and McCallum Way
1 Recommended Improvements:
4 4
3 3
3 3
2 2
1 1
Traffic Signals and Signs (1 collision)
Primary Collision Factor:

Complaint of Pain: 1
Other Visible Injury: 0
Severe Injury: 0
Fatal Injury: 0
1 Collision from January 2020 to December 2024
City of Cathedral City
Local Roadway Safety Plan
N

NOT TO SCALE
Santoro Drive
Cypress Road
Cathedral City Local Road Safety Plan
PROJECT 5 – RAMON ROAD CLASS IV

SEPARATED BIKEWAY
Ramon Road Corridor
Ramon Road Class IV Separated Bikeway
Project 5
Install Class IV separated bikeway1
Recommended Improvements:
1 1
Automobile Right-of-Way (14 collisions)
Improper Turning (13 collisions)
Unsafe Speed (12 collisions)
Primary Collision Factor:

Complaint of Pain: 41
Other Visible Injury: 16
Severe Injury: 12
Fatal Injury: 6
75 Collisions from January 2020 to December 2024
City of Cathedral City
Local Roadway Safety Plan

NOT TO SCALE
Ramon Road

Iteris, Inc. | Appendix D
Cathedral City Local Road Safety Plan
APPENDIX D – PROJECT COST ESTIMATES

Table D-1: Cathedral City Intersection Safety Program
Location No. Item Description Unit Quantity Unit Cost Total Cost Cathedral
Canyon
Drive/East
Palm
Canyon
Drive
1A Update signal timing with protected NB/SB
left turn phases EA 1 $200,000 $200,000
Date Palm
Drive/
Victoria
Drive
1B-1 Move westbound stop line closer to the
intersection by removing striping LF 200 $3.00 $600
1B-2 Install new striping to improve sight line and
crosswalk on the east leg LF 200 $7.00 $1,400
1B-3 Modify signal phasing to implement a
leading pedestrian interval (LPI) EA 1 $7,000 $7,000
Cathedral
Canyon
Drive/ 33rd
Avenue
1C-1 Install new signs for all-way stop control EA 8 $598 $4,784 1C-2 Install new striping for all-wa y stop control LF 200 $7.00 $1,400 1C-3 Add street lights in blocks north and south of
the intersection LS 1 $238,050 $238,050
Vista
Chino/
Landau
Boulevard
1D Install raised median on the west leg and
east leg SF 1,500 $75 $112,500
East Palm
Canyon
Drive/Perez
Road
1E
Convert the two-way left turn lane (TWLTL)
on the west leg to prohibit turns (not raised
median for emergency services access)
SF 1,000 $75 $75,000
Mountain
View Road/
Varner
Road
1F-1 Add “WATCH FOR ONCOMING TRAFFIC”
sign EA 1 $598 $598
1F-2 Add guardrail along the northeast corner for
westbound right turn movements LF 200 $50.00 $10,000
Date Palm
Drive/
McCallum
Way
1G-1 Update signal timing with protected
eastbound/westbound left turn phases EA 1 $200,000 $200,000 1G-2 Modify signal phasing to implement a
leading pedestrian interval (LPI) EA 1 $7,000 $7,000
San Luis
Rey Drive/
Mission
Drive
1H-1 Install dynamic/variable speed warning signs EA 4 $6,000 $24,000 1H-2 Install flashing beacons for the “STOP” sign
for all approaches EA 1 $130,901 $130,901
Total Construction Cost $1,013,233
Soft Cost 150% $1,519,850
Total Cost (including contingencies) $2,533,083

Table D-2: Cost Estimate for Ramon Road Safety Improvements Location No. Item Description Unit Quantity Unit Cost Total Cost Ramon Road/
Whispering
Palms Trail
2A-1
Modify signal phasing to
implement a leading pedestrian
interval (LPI)
EA 1 $7,000 $7,000
2A-2
Paint red curb to prohibit on-
street parking along the west side
of Whispering Palms Trail, south
of Ramon Road
SQFT 200 $10 $2,000
2A-3 Install "NO PARKING ANY TIME"
signs EA 2 $600 $1,200
Ramon Road/
Crossley
Road
2B-1
Paint red curb to prohibit on-
street parking along the east side
of Crossley Road, north of
Ramon Road
SQFT 400 $10 $4,000
2B-2 Install "NO PARKING ANY TIME"
signs EA 3 $600 $1,800
Ramon
Road/Avenida
Maravilla-
Cathedral
Canyon Drive
2C-1
Improve the sight line for
northbound approach with raised
pavement marker and striping
SF 600 $75 $45,000
2C-2
Install dynamic/variable speed
warning signs for the northbound
approach
EA 2 $6,000 $12,000
2C-3
Modify signal phasing to
implement a leading pedestrian
interval (LPI)
EA 1 $7,000 $7,000
Ramon Road/
Date Palm
Drive
2D-1 Update signal timing for more
clearance time EA 1 $15,000 $15,000
2D-2
Improve sight line at the north leg
for gas station driveway egress
movements
EA 2 $261 $522
2D-3
Modify signal phasing to
implement a leading pedestrian
interval (LPI)
EA 1 $7,000 $7,000
Ramon Road/
Avenida Del
Yermo-Desert
Vista Road
2E-1
Modify the intersection to a four-
leg signalized intersection,
remove striping
LF 100 $3.00 $300
2E-2 Add new striping for the four-leg
signalized intersection LF 100 $7.00 $700
2E-3
Implement split phasing for
northbound and southbound
movements
EA 1 $200,000 $200,000
2E-4 Add protected phasing for
eastbound left turns EA 1 $200,000 $200,000
2E-5
Remove raised median on
Ramon Road between Avenida
Del Yermo and Desert Vista
Road, shift eastbound stop line to
the west side of Avenida Del
Yermo
SF 200 $75 $15,000
2E-6
Modify signal phasing to
implement a leading pedestrian
interval (LPI)
EA 1 $7,000 $7,000
2E-7 Traffic signal modifications
(relocating signal post) EA 1 $200,000 $200,000
Total Construction Cost $725,522
Soft Cost 150% $1,088,283
Total Cost (including contingencies) $1,813,805

Table D-3: Cost Estimate for Date Palm Drive Safety Improvements Location No. Item Description Unit Quantity Unit Cost Total Cost Date Palm
Drive/
35th
Avenue
3A-1 Install traffic signal at the in tersection EA 1 $600,000 $600,000 3A-2 Add protected phasing for southbound left
turns EA 1 $200,000 $200,000
3A-3 Add marked crosswalks on the south leg and
east leg EA 2 $10,000 $20,000
3A-4 Add street lights in blocks north and south of
the intersection LS 1 $238,050 $238,050
Date Palm
Drive/
Tachevah
Drive
3B-1 Install traffic signal at the intersection EA 1 $600,000 $600,000 3B-2 Add protected phasing for northbound left
turns EA 1 $200,000 $200,000
Date Palm
Drive/
Vista Chino
3C-1 Improve signal timing for eastbound left turns
and southbound right turns EA 1 $15,000 $15,000
3C-2 Install dynamic/variable speed warning signs EA 4 $6,000 $24,000 Total Construction Cost $1,897,050
Soft Cost 150% $2,845,575
Total Cost (including contingencies) $4,742,626

Table D-4: Cost Estimate for Santoro Drive Bicycle Lanes and Traffic Calming Elements Location No. Item Description Unit Quantit
y
Unit
Cost Total Cost
Santoro
Drive/
Cypress
Road
4-1 Install "BIKE LANE" signs EA 8 $598 $4,784
4-2
Install Class II bike lane pavement marking
along both sides of Santoro, between 30th
Ave and McCallum
LF 10,400 $7.00 $72,800
4-3 Convert Two-Way Stop Control to All-Way
Stop Control with new "STOP" signs EA 8 $598 $4,784
4-4 Install new pavement marking for STOP
control LF 400 $7.00 $2,800
Total Construction Cost $85,168
Soft Cost 150% $127,752
Total Cost (including contingencies) $212,920

Table D-5: Cost Estimate for Ramon Road Class IV Separated Bikeway Location No. Item Description Unit Quantity Unit Cost Total Cost Ramon
Road
Corridor
5-1 Install Class IV separated bikeway MI 2.75 $500,000 $1,375,000 Total Construction Cost $1,375,000
Soft Cost 150% $2,062,500
Total Cost (including contingencies) $3,437,500