Read from the councils' own documents — check the source. Each figure was copied from a staff report, budget, financial statement or set of minutes, by a person or by a language model whose quote had to be found word for word in the document. Every figure links to the passage it came from; the city's original file is the official record. Updated 2026-10-20.
8figures
Studies the council was shown
- 2022-02-01 Fullerton staff (default-tier report): SCE rate plus a penny per kWh or 3.7% above SCE | plus 1.5 cents per kWh or 5.6% — Basic Choice Tier for the City's municipal energy accounts document
- 2023-05-16 ACES (proposal to benchmark Fullerton's OCPA withdrawal costs; not hired): — directed staff to ask OCPA for information regarding withdrawal document
Studying, joining or starting a CCA
| Date | CCA | Kind | Figure | What it is | Source |
|---|---|---|---|---|---|
| 2023-05-16 | Orange County Power Authority | Study / start-up | $12,675 | ACES offers to benchmark Fullerton's OCPA withdrawal costs for $12,675; the council instead asks OCPA for information and hires no one. | passage · city original |
| 2023-04-04 | Orange County Power Authority | Study / start-up | $50,000 to $100,000 city pays | Staff: a consultant analysis of what leaving OCPA would cost Fullerton would itself cost an estimated $50,000 to $100,000. | passage · city original |
| 2022-07-05 | Orange County Power Authority | Joining | no fiscal impact | OCPA transparency item noting OCPA's $1.96 million CPUC fine; staff report fiscal impact none. | passage · city original |
The city's own electricity
| Date | CCA | Figure | What it is | Source |
|---|---|---|---|---|
| 2023-04-04 | Orange County Power Authority | $38,000 a year · city saves · estimate / proposal | Fullerton's municipal accounts on OCPA's Basic Choice 38% product are estimated to save about $38,000 in 2023 versus comparable SCE generation rates. product: Basic Choice 38% · compared with SCE generation rates | passage · city original |
Grants and projects paid by the CCA
| Date | CCA | Figure | What it is | Source |
|---|---|---|---|---|
| 2025-05-20 | Orange County Power Authority | Orange County Power Authority: $5,000 city receives | OCPA sponsors Fullerton's 2025 State of the City event with $5,000. | passage · city original |
Leaving or a failed CCA
| Date | CCA | Figure | What it is | Source |
|---|---|---|---|---|
| 2023-05-16 | Orange County Power Authority | $12,675 city pays · estimate / proposal | Fullerton would pay consultant ACES $12,675, half at contract execution and half on completion, for an assessment of withdrawal costs from Orange County Power Authority. | passage · city original |
| 2023-04-04 | Orange County Power Authority | $100,000 city pays · estimate / proposal | Fullerton estimates hiring a consultant to analyze the cost of withdrawing from OCPA would cost $50,000 to $100,000, paid by the city one time. | passage · city original |
| 2023-04-04 | Orange County Power Authority | $50,000 city pays · estimate / proposal | Fullerton estimates hiring a consultant to analyze its withdrawal liability from OCPA would cost $50,000 to $100,000, a one-time cost paid by the city. | passage · city original |