5/18/2026 Scope 1 – page 21 Contract Number: EP-2026-02 APPENDIX C – SERVICE PROVIDER STAFFING
Service launch
Lunar Resource Title Project Role Full-Time
Equivalent
Tomas Weaver Senior Business
Development
Manager
Contract management,
account management,
program design.
20%
John Linfoot Head of Energy
Platform Products
Grid services product
deployment and
device integrations.

Train on the use of the
Gridshare platform.
20%
Amanda Little Head of Legal Contracting: MSA,
SoWs, OEMs,
aggregators, and all
our other partners in
this project.
10%
Grace Hsu VP Legal and People Contracting:
overall/MSA.
10%
Adam Cundy Head of Delivery Gridshare SaaS
delivery oversight.
10%
Stefanie Bator Senior Program
Manager
Project and program
management
oversight.
30%
Ed Gunn VP of Revenue Executive sponsor,
escalation
management,
commercial oversight.
5%
Rowan Hawksdale +
Team
VPP and Integrations
Software Lead

DERMS/OEM
integrations, Flex
Product.
30%
Jesus Prieto Senior Director of
Software Engineering
Engineering
oversight.
5%
Docusign Envelope ID: 7E36D0EE-D06C-8B00-8311-24234159125D

Page 448 of 1037 ends

5/18/2026 Scope 1 – page 22 Contract Number: EP-2026-02 George Penny Head of Markets Program design,
Simulations,
modeling.
5%
Sam Wevers Director of Product Product oversight -
products meet 3CE’s
expectations.
2%
Natalie Sullivan Senior Information
Security Manager
Oversee the
implementation of all
cyber security
compliance
requirements.
2%
Post launch live service:

Lunar Resource Title Project Role Full-Time
Equivalent
Stefanie Bator Senior Program
Manager
Program operations,
admin, reporting,
client support.
5 - 50%
Tomas Weaver Senior Business
Development
Manager
Account management,
program strategy,
future roadmap and
strategy.
10%
John Linfoot Head of Energy
Platform Products
DERMS product
oversight.
10%
Amanda Little Head of Legal Legal support. 2%
Adam Cundy Head of Delivery Service delivery
oversight.
5%
Ed Gunn VP of Revenue Executive sponsor,
escalation
management,
commercial oversight.
2%
Rowan Hawksdale +
Team
VPP and Integrations
Software Lead
DERMS ongoing
development, testing,
tech support.
5 - 20%
Docusign Envelope ID: 7E36D0EE-D06C-8B00-8311-24234159125D

Page 449 of 1037 ends

Staff Report Item 21
TO: 3CE Operations Board of Directors
FROM: Robert M. Shaw, Chief Executive Officer
PREPARED BY: Leo Kim, Director of Power Supply
SUBJECT: Adopt Resolution No. OB-2026-09 approving and authorizing the CEO to execute necessary agreements with California Community Power (“CC Power”) to amend the power purchase agreement ("PPA") for the Fish Lake Geothermal Project (“Fish Lake”) with Open Mountain Energy, LLC
DATE: May 27, 2026
RECOMMENDATION:

Staff recommend Board adopt Resolution No. OB-2026-09 approving and authorizing the CEO to execute necessary agreements with California Community Power to amend the power purchase agreement for the Fish Lake Geothermal Project with Open Mountain Energy, LLC.

BACKGROUND:

The Operations Board originally authorized the CEO to execute the agreements with CC Power for the Fish Lake PPA in June 2022 for a term of 20 years. Fish Lake is a 13 MW geothermal project being developed in Esmeralda County, Nevada that was procured through CC Power’s 2021 RFO, a joint powers agency comprised of nine member CCAs. In June of 2024, Fish Lake failed to achieve the Guaranteed Construction Date. In addition, federal tariffs were imposed on major equipment for the project, furthering Seller’s project delivery challenges in the face of higher costs. On April 22, 20626, the CCPower Board approved a First Amendment to the Fish Lake agreement that updates the Guaranteed Construction Date and Guaranteed Commercial Operation Date, updating the Delivery Point, increasing CC Power’s potential offtake capacity from the Project, and adjusting the contract price.

DISCUSSION/ANALYSIS:

The California Public Utilities Commission (CPUC) continues to identify a critical need for geothermal generation in support of California’s pursuit of its SB100 goals, with its latest procurement order

Page 450 of 1037 ends

specifying that 25% of incremental capacity come from clean firm and/or long-duration storage. This PPA helps 3CE meet its portfolio and compliance obligations.

Project Details and CC Power Agreement
The Fish Lake contract is for a 13 MW portion of the up to 19.8 MW Fish Lake geothermal project located in Esmeralda Country, Nevada. Project Participants will receive the energy and PCC1 RECs for their portion of the project and will be able to count the capacity towards their Resource Adequacy and the MTR Decisions’ compliance requirements upon allocating their CAISO Import Allocation Rights to the Project. The Project possesses full site control and is finalizing its NEPA environmental review with the Bureau of Land Management. The Project will utilize equipment sourced from OME’s parent company, Kaishan, and, contingent on meeting a 2027 Commercial Operation Date, is expected to retain eligibility for federal tax incentives. The project has a signed interconnection agreement with NV Energy and a Transmission Service Agreement on the Green Link West transmission line, which is expected to become operational in May 2027.

The contract structure utilized for Fish Lake involves CC Power signing the amendment, then each participating CCA signing a Project Participation Agreement with CC Power. The Project Participation Agreement has a step-up provision in the event that a participating CCA withdraws from the agreement, capped at 125% of the participant share. The step-up provision is necessary to ensure the PPA between CC Power and OME will continue, in the unlikely event one or more of the eight participating CCAs’ default. In such case, rather than allowing the PPA to terminate, the remaining CCA participants will increase their share up to the cap, if necessary. The table below outlines 3CE’s step up obligations.

Project
Participants
%
Share
Guaranteed Capacity
(MW)
Maximum Contract
Capacity
New Step-Up
Entitlement
3CE 19% 2.42 3.68 4.60
CPSF 15% 1.89 2.87 3.59
PCE 18% 2.31 3.52 4.41
RCEA 3% 0.36 0.55 0.69
SJCE 17% 2.26 3.45 4.31
SVCE 14% 1.82 2.77 3.47
SCPA 12% 1.52 2.32 2.90
VCE 3% 0.42 0.63 0.79
Total 100% 13.00 19.80

Page 451 of 1037 ends

Consideration of Amendment
The Amendment updates several contract provisions and is the result, in part, of shifting economic conditions due to recent federal policy. A general summary of amendments to the PPA are detailed below.

Original PPA Proposed Amendment
Counterparty Fish Lake Geothermal Project No change
Product Bucket 1 (PCC1) Renewable
Energy, baseload geothermal
No change
Delivery Term 20 years
COD April 1, 2024
20 years
COD October 1, 2027
Contract Capacity 2.42 MW to 3.03 MW 2.42 MW up to 4.6 MW Location Esmeralda County, Nevada No change
Percentage of Retail Load
Served

0.4% of load No change
Not to Exceed $43,000,000 $76,200,000
FISCAL IMPACT:

The fiscal impact of the proposed amendment for baseload renewable geothermal energy from the Fish Lake Geothermal project will increase from an NTE of $43,000,000 to $76,200,000 with the increased price and the potential capacity increases. Based on 3CE's 19% project share, its proportional obligation increases from approximately $8.2 million to $14.5 million, an increase of roughly $6.3 million over the contract term.

Page 452 of 1037 ends

CONCLUSION:

Approval of Project Participation Agreement to amend the Fish Lake Geothermal project will meet about

0.4% 3CE’s load, provide clean firm energy to meet the CPUC’s procurement orders and critical resource adequacy benefits.

ATTACHMENT(S):

1. CC Power Project Participation Agreement for Fish Lake

2. 1st Amendment of the Fish Lake PPA (Redacted)

3. Original PPA (Redacted)

4. Draft Resolution No. OB-2026-09

Page 453 of 1037 ends

FISH LAKE GEOTHERMAL

PROJECT PARTICIPATION SHARE AGREEMENT
among

CENTRAL COAST COMMUNITY ENERGY
and

CITY AND COUNTY OF SAN FRANCISCO, ACTING BY AND THROUGH ITS

PUBLIC UTILITIES COMMISSION CLEANPOWERSF
and

PENINSULA CLEAN ENERGY AUTHORITY
and

REDWOOD COAST ENERGY AUTHORITY
and
CITY OF SAN JOSÉ, ADMINISTRATOR OF SAN JOSÉ CLEAN ENERGY and

SILICON VALLEY CLEAN ENERGY AUTHORITY
and

SONOMA CLEAN POWER AUTHORITY
and

VALLEY CLEAN ENERGY
and

CALIFORNIA COMMUNITY POWER

Page 454 of 1037 ends

i

TABLE OF CONTENTS
Page
ARTICLE 1 DEFINITIONS ....................................................................................................... 2

1.1. Definitions .............................................................................................................. 2

1.2. Rules of Interpretation .......................................................................................... 14 ARTICLE 2 EFFECTIVE DATE AND TERM...................................................................... 15

2.1. Term ..................................................................................................................... 15 ARTICLE 3 AGREEMENT ..................................................................................................... 16

3.1. Transaction ........................................................................................................... 16

3.2. RPS Compliance .................................................................................................. 16 ARTICLE 4 ENTITLEMENT SHARE................................................................................... 17

4.1. Initial Entitlement Share ....................................................................................... 17

4.1. Change of Entitlement Share ................................................................................ 17

4.2. Reduction of Entitlement Share to Zero ............................................................... 17 ARTICLE 5 OBLIGATIONS OF CCP; ROLE OF CCP BOARD AND CCP MANAGER ................................................................................................... 17

5.1. Obligations of CCP .............................................................................................. 17

5.2. Role of CCP Board ............................................................................................... 21

5.3. Role of CCP Manager .......................................................................................... 22 ARTICLE 6 PROJECT COMMITTEE .................................................................................. 23

6.1. Establishment and Authorization of the Project Committee ................................ 23

6.2. Project Committee Membership ........................................................................... 23

6.1. Project Committee Operations, Meetings, and Voting ......................................... 23

6.2. Project Committee Responsibilities. The Project Committee shall have the following responsibilities ..................................................................................... 24

6.3. Subcommittees ..................................................................................................... 27

6.4. ................................................................................... 27

6.5. Inaction by Committee ......................................................................................... 27

6.6. Delegation ............................................................................................................ 27 ARTICLE 7 [RESERVED] ....................................................................................................... 28 ARTICLE 8 OPERATING ACCOUNT .................................................................................. 28

8.1. Calculation of Estimated Monthly Project Cost ................................................... 28

8.2. Operating Account ............................................................................................... 28 ARTICLE 9 BILLING .............................................................................................................. 29

9.1. Monthly Costs ...................................................................................................... 29

9.2. Billing Statements ................................................................................................ 29

9.3. Disputed Monthly Billing Statement .................................................................... 29

9.4. Payment Adjustments; Billing Errors .................................................................. 29

Page 455 of 1037 ends

ii

9.5. Payment of Invoice Amount ................................................................................ 29

9.6. Withdrawal of Invoice Amount from Operating Account .................................... 30

9.7. Late Payments ....................................................................................................... 30 ARTICLE 10 UNCONDITIONAL PAYMENT OBLIGATIONS;
AUTHORIZATIONS; CONFLICTS; LITIGATION ............................... 30

10.1. Unconditional Payment Obligation ....................................................................... 30

10.2. Authorizations ....................................................................................................... 31

10.3. Conflicts ................................................................................................................ 31

10.4. Litigation ............................................................................................................... 31

10.5. San José Clean Energy .......................................................................................... 31

10.6. Clean Power San Francisco ................................................................................... 31 ARTICLE 11 PROJECT SPECIFIC MATTERS AND PROJECT
AND OBLIGATIONS ................................. 32

11.1. CCP Rights and Obligations under the PPA ......................................................... 32

11.2. Obligations of CCP and Project Participants to Maximize the Economic and Compliance Value of the Project .................................................................... 32 ARTICLE 12 NONPERFORMANCE AND PAYMENT DEFAULT ................................... 33

12.1. Nonperformance by Project Participants ............................................................... 33

12.2. Payment Default .................................................................................................... 33

12.3. Payment Default Notice ........................................................................................ 34

12.4. Cured Payment Default ......................................................................................... 34

12.5. 34

12.6. Termination and Disposal of Project ..................................................................... 35

12.7. Step-Up Invoices ................................................................................................... 35

12.8. Step- ................................. 36

12.9. Elimination or Reduction of Payment Obligations................................................ 38 ARTICLE 13 LIABILITY ......................................................................................................... 38

13.1. ............................................................ 38

13.2. No Liability of CCP or Project Participants, Their Directors, Officers, Officers, Employees Not Individually Liable ....................................................... 39

13.3. Extent of Exculpation; Enforcement of Rights ..................................................... 39

13.4. No General Liability of CCP ................................................................................. 39

13.5. Indemnification ..................................................................................................... 39 ARTICLE 14 NOTICES ............................................................................................................. 40

14.1. Addresses for the Delivery of Notices .................................................................. 40

14.2. Acceptable Means of Delivering Notice ............................................................... 40 ARTICLE 15 ASSIGNMENT .................................................................................................... 40

15.1. General Prohibition on Assignments ..................................................................... 40 ARTICLE 16 GOVERNING LAW AND DISPUTE RESOLUTION .................................... 40

Page 456 of 1037 ends

iii

16.1. Governing Law..................................................................................................... 40

16.2. Dispute Resolution ................................................................................................41 ARTICLE 17 MISCELLANEOUS............................................................................................41

17.1. Entire Agreement; Integration; Exhibits ...............................................................41

17.2. Amendments..........................................................................................................41

17.3. No Waiver.............................................................................................................41

17.4. Severability............................................................................................................41

17.5. Counterparts..........................................................................................................41

17.6. Electronic Delivery................................................................................................41

17.7. Binding Effect .......................................................................................................42

17.8. Forward Contract...................................................................................................42

17.9. City of San Francisco Standard Provisions...........................................................42

17.10. City of San José Standard Provisions....................................................................43

17.11. Further Assurances................................................................................................44 EXHIBIT A NOTICES.............................................................................................................A-1

EXHIBIT B SCHEDULE OF PROJECT PARTICIPANT ENTITLEMENT SHARES AND STEP-UP ALLOCATION CAPS.............................................................. B-1

EXHIBIT C PROCEDURE FOR VOLUNTARY REDUCTION OF PROJECT
..................................................... C-1 EXHIBIT D PROJECT COMMITTEE OPERATIONS, MEETINGS, AND VOTING.........D-1

Page 457 of 1037 ends

1 FISH LAKE GEOTHERMAL

PROJECT PARTICIPATION SHARE AGREEMENT

PREAMBLE
This Project Participation Share Agreement September 22, 2022 Effective Date by and among Central Coast Clean Energy, a California joint powers authority, the City and County of San Francisco acting by and through its Public Utilities Commission, CleanPowerSF, Peninsula Clean Energy Authority, a California joint powers authority, Redwood Coast Energy Authority, a California joint powers authority, City of San José, a California municipality, Silicon Valley Clean Energy Authority, a California joint powers authority, Sonoma Clean Power Authority, a California joint powers authority, and Valley Clean Energy, a California joint powers authority Project Participant Project Participants
a California joint powers authority. CCP and the Project Participants are sometimes referred to Party Parties.

Agreement are used with the meanings ascribed to them in Article 1 to this Agreement.

RECITALS
WHEREAS CCP is a Joint Powers Authority, was formed for the purpose of developing, acquiring, constructing, owning, managing, contracting for, engaging in, or financing electric energy generation and storage projects, and for other purposes; and WHEREAS, the Project Participants have participated with CCP in the negotiation of an agreement for purchase of the electric output of the Fish Lake Geothermal Project Project as defined in Exhibit A of the PPA), and CCP is to enter into a Renewable Power Purchase Agreement PPA , which is incorporated herein by this reference, with Fish Lake Geothermal LLC, a Nevada limited liability company Project Developer providing for purchase of the electric output, and associated rights, benefits, and credits from the Project on behalf of the Project Participants.

WHEREAS, pursuant to this Agreement, CCP shall cause to deliver to each Project Participant of the electric output and associated rights, benefits, and credits of the Project.

NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, and for other good and valuable consideration, the sufficiency and adequacy of which are hereby acknowledged, the Parties agree to the following:

Page 458 of 1037 ends

2 ARTICLE 1

DEFINITIONS

1.1. Definitions. The following terms, when used herein with initial capitalization,shall have the meanings set forth below:

AC
Affiliate
controls, is controlled by, or is under common control with such designated Person. For purposes respect to any Person, shall mean (a) the direct or indirect right to cast at least fifty percent (50%) of the votes exercisable at an annual general meeting (or its equivalent) of such Person or, if there are no such rights, ownership of at least fifty percent (50%) of the equity or other ownership interest in such Person, or (b) the right to direct the policies or operations of such Person.

Agreement has the meaning set forth in the Preamble and any Exhibits, schedules, and any written supplements hereto.

Amended Annual Budget means the budget approved by the Project Committee and adopted by the CCP Board pursuant to Section 5.1(c) of this Agreement.

Ancillary Services means all ancillary services, products and other attributes, if any, associated with the Installed Capacity of the Facility.

Annual Budget means the budget approved by the Project Committee and adopted by the CCP Board pursuant to Section 5.1(c) of this Agreement.

Bankrupt Bankruptcy means, with respect to any entity, such entity that (a) files a petition or otherwise commences, authorizes or acquiescesin the commencement of a proceeding or cause of action under any bankruptcy, insolvency, reorganization or similar Law, (b) has any such petition filed or commenced against it which remains unstayed or undismissed for a period of ninety (90) days, (c) makes an assignment or any general arrangement for the benefit of creditors, (d) otherwise becomes bankrupt or insolvent (however evidenced), (e) has a liquidator, administrator, receiver, trustee, conservator or similar official appointed with respect to it or any substantial portion of its property or assets, or (f) is generally unable to pay its debts as they fall due.

Billing Statement has the meaning set forth in Section 9.2 of this Agreement.

Buyer Liability Pass Through Agreement or BLPTA means, for each Project Participant, the form set forth in Exhibit L of the PPA, as executed by such Project Participant, countersigned by CCP, and delivered to the Project Developer.

Business Day Bank
holiday in California. A Business Day begins at 8:00 a.m. and ends at 5:00 p.m. local time for the Party sending a Notice, or payment, or performing a specified action. ing, with

Page 459 of 1037 ends

3 CAISO
successor entity performing similar functions.

CAISO Balancing Authority Area
CAISO Grid
CAISO Tariff.

CAISO Tariff California Independent System Operator Corporation Agreement and Tariff, Business Practice Manuals (BPMs), and Operating Procedures, including the rules, protocols, procedures, and standards attached thereto, as the same may be amended or modified from time-to-time and approved by FERC.

California Renewables Portfolio Standard RPS
program and policies established by California State Senate Bills 1038 (2002), 1078 (2002), 107 (2008), X-1 2 (2011), 350 (2015), and 100 (2018) as codified in, inter alia, California Public Utilities Code Sections 399.11 through 399.31 and California Public Resources Code Sections 25740 through 25751, as such provisions are amended or supplemented from time to time.

Capital Improvements means any unit of property, property right, land or land right which is a replacement, repair, addition, improvement or betterment to the Project or any transmission facilities relating to, or for the benefit of, the Project, the betterment of land or land rights or the enlargement or betterment of any such unit of property constituting a part of the Project or related transmission facilities which is (i) consistent with Prudent Utility Practices and determined necessary and/or desirable by the CCP Board or (ii) required by any governmental agency having jurisdiction over the Project.

CCP Board means the Board of Directors of California Community Power.

CCP Manager means the General Manager of California Community Power.

CEC the California Energy Commission, or any successor agency performing similar statutory functions.

Capacity Attribute
credit, or accounting construct associated with the amount of power that the Facility can generate or deliver to the Delivery Point at a particular moment and that can be purchased, sold, or conveyed under CAISO or CPUC market rules, including Resource Adequacy Benefits.

Capacity Damages means any liquidated damages paid by the Project Developer to CCP pursuant to Exhibit B of the PPA.

CEQA , as amended or supplemented
from time to time.

Chairperson has the meaning set forth in Exhibit D.

Change of Control has the meaning set forth in Section 1.1 of the PPA.

Page 460 of 1037 ends

4 PPA.

PPA.

Commercial Operation has the meaning set forth in Section 1.1 of the PPA.

Commercial Operation Date COD has the meaning set forth in Section 1.1 of the Commercial Operation Delay Damages has the meaning set forth in Section 1.1 of the Community Choice Aggregator has the meaning set forth in California Public Utilities Code § 331.1.

Confidential Information in Section 18.1 of the PPA.

Construction Start Exhibit B of the PPA.

Construction Start Date Exhibit B of the PPA.

Contract Price of the PPA.

Contract Term 2.1 of the PPA.

Contract Year first Contract
Yearshall commence on the Commercial Operation Date and each subsequent Contract Year shall commence on the anniversary of the Commercial Operation Date.

De

12.8(b) or 12.8(c), brokerage fees, commissions and other similar third-party transaction costs and expenses reasonably incurred by such Project Participant in terminating any arrangement pursuant the Project Participant in connection with the Step-Up Allocation.

CPUC n, or successor entity.

Cured Payment Default means a Payment Default that has been cured in accordance with Section 12.4 of this Agreement.

Daily Delay Damages has the meaning set forth in Section 1.1 of the PPA.

Damage Payment has the meaning set forth in Section 1.1 of the PPA.

Day-Ahead Market
Day-Ahead Schedule
Defaulting Project Participant has the meaning set forth in Section 12.1.

Delivery Point means the Facility Pnode on the CAISO grid.

Costs

Page 461 of 1037 ends

5 Delivery Term s the period of Contract Years set forth on the Cover Sheet of the PPA beginning on the Commercial Operation Date, unless terminated earlier in accordance with the terms and conditions of the PPA.

Designated Fund has the meaning set forth in Section 10.5.

Development Security a) cash or (b) a Letter of Credit in the amount set forth on the Cover Sheet of the PPA.

Effective Date has the meaning set forth in the Preamble.

Electrical Losses has the meaning set forth in Section 1.1 of the PPA.

Emission Reduction Credits ERCs
authorized by a local air pollution control district pursuant to California Division 26 Air Resources; Health and Safety Code Sections 40709 and 40709.5, whereby a district has established a system by which all reductions in the emission of air contaminants that are to be used to offset certain future increases in the emission of air contaminants shall be banked prior to use to offset future increases in emissions.

Energy -hours or Megawatt-hours or
multiple units thereof.

Energy Management System EMS y management
system.

Entitlement Share means the percentage entitlement of each Project Participant as set forth in Exhibit B of this
Shares and Step-Up Allocation Caps may
be amended pursuant to Section 4.2 or 12.8.

Entitlement Share Reduction Amount Exhibit C.

Entitlement Share Reduction Compensation Amount has the meaning set forth in Exhibit C.

Entitlement Share Reduction Notice has the meaning set forth in Exhibit C.

Environmental Attributes
or under any and all other international, federal, regional, state or other law, rule, regulation, bylaw, treaty or other intergovernmental compact, decision, administrative decision, program (including any voluntary compliance or membership program), competitive market or business method (including all credits, certificates, benefits, and emission measurements, reductions, offsets and allowances related thereto) that are attributable now, or in the future to the Facility and its displacement of conventional energy generation.

Estimated Monthly Project Cost .

Page 462 of 1037 ends

6 Event of Default set forth in Section 11.1 of the PPA.

Expected Commercial Operation Date s the date set forth on the Cover Sheet of the PPA.

Expected Energy quantity of Energy specified on the Cover Sheet of the PPA.

Facility means the geothermal generating facility described on the Cover Sheet of the PPA and in Exhibit A of the PPA, located at the Site, and including mechanical equipment and associated facilities and equipment required to deliver Energy to the Delivery Point.

Facility Energy Energy delivered from the Facility to the Delivery Point during any Settlement Interval or Settlement Period, as measured at the Facility Metering Point by the Facility Meter, as such meter readings are adjusted by the CAISO for any applicable Electrical Losses or Station Use.

Facility Meter has the meaning set forth in Section 1.1 of the PPA.

Facility Metering Point in Exhibit P
of the PPA.

FERC successor government
agency.

Flexible Capacity
MWs of Product which are eligible to satisfy Flexible RAR.

Flexible RAR -serving
entities by the CAISO pursuant to the CAISO Tariff, the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority.

Force Majeure Event Section 10.1 of the PPA.

Full Capacity Deliverability Status FCDS
Tariff.

Full Capacity Deliverability Status Finding
CAISO that the Facility is eligible for Full Capacity Deliverability Status.

Gains a Project Participant assuming all or a portion of a

12.8(b) or 12.8(c), an amount equal to the present value of the economic benefit to it, if any (exclusive of Costs), resulting from such Step-Up Allocation for the remaining Contract Term of the PPA, determined in a commercially reasonable manner. Factors used in determining the economic benefit to such Project Participant may include, without limitation, reference to information supplied by one or more third parties, which shall exclude Affiliates of such Project Participant, including without limitation, quotations (either firm or indicative) of relevant rates,

Page 463 of 1037 ends

7 prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs (e.g., NP-15), all of which should be calculated for the remaining Contract Term, and include the value of Environmental Attributes and Capacity Attributes.

GHG Regulations
Board), Subchapter 10 (Climate Change), Article 5 (Emissions Cap), Sections 95800 to 96023 of the California Code of Regulations, as amended or supplemented from time to time.

Governmental Authority local, or municipal
government, any political subdivision thereof or any other governmental, congressional, or parliamentary, regulatory, or judicial instrumentality, authority, body, agency, department, bureau, or entity with authority to bind a Party at law, including CAISO; provided Au , except to the extent that the Party is acting
solely in its governmental capacity.

Greenhouse Gas GHG
other applicable Laws.

Guaranteed Commercial Operation Date means the date set forth on the Cover Sheet of the PPA, as such date may be extended pursuant to Exhibit B of the PPA.

Guaranteed Construction Start Date means the date set forth on the Cover Sheet of the PPA, as such date may be extended pursuant to Exhibit B of the PPA.

Guaranteed Energy Production Damages means any liquidated damages paid by the Project Developer to CCP pursuant to Section 4.7 of the PPA.

Indemnifying Party Section 13.5.

Installed Capacity the lesser of (a) Facility PMAX, and (b) the peak electrical output of the Facility, as measured in MW(AC) at the Delivery Point, that achieves Commercial Operation, adjusted for ambient conditions on the date of the performance test.

Interconnection Agreement
Project Developer pursuant to which the Facility will be interconnected with the Transmission System, and pursuant to which Project Developer ction Facilities and any other Interconnection Facilities will be constructed, operated, and maintained during the PPA Contract Term.

Interconnection Facilities
devices, and metering facilities required to connect the Facility with the Transmission System in accordance with the Interconnection Agreement.

Interest Rate has the meaning set forth in Section 8.2 of the PPA.

Invoice Amount has the meaning set forth in Section 9.2.

Page 464 of 1037 ends

8 ITC tax credit established pursuant to Section 48 of the United States Internal Revenue Code of 1986.

Joint Powers Act
(Government Code Section 6500 et seq.).

Joint Powers Agreement certain Joint Powers Agreement dated January 29, 2021, as amended from time to time, under which CCP is organized as a Joint Powers Authority in accordance with the Joint Powers Act.
kWh -hour measured in alternating current, unless expressly stated in terms of direct current.

Late Payment Notice means a notice issued by CCP to a Project Participant pursuant to Section 9.7.

Late Payment Charge has the meaning set forth in Section 9.7.

Law
judgment, permit or any interpretation thereof, promulgated or issued by a Governmental Authority.

Letter(s) of Credit has the meaning set forth in Section 1.1 the PPA.

Local Capacity Area Resource
Local RAR ents established for load-serving entities by the CAISO pursuant to the CAISO Tariff, the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority. local area reliability, local resource adequacy, local resource adequacy procurement requirements, or local capacity requirements in other regulatory proceedings or legislative actions.

Losses means, with respect to a Project Participant assuming all or a portion of a Defaulting Project Participant

12.8(b) or 12.8(c), an amount equal to the present value of the economic loss to it, if any (exclusive of Costs), resulting from such Step-Up Allocation for the remaining Contract Term of the PPA, determined in a commercially reasonable manner. Factors used in determining economic loss to such Project Participant may include, without limitation, reference to information supplied by one or more third parties, which shall exclude Affiliates of the Project Participant, including without limitation, quotations (either firm or indicative) of relevant rates, prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs (e.g., NP-15), all of which should be calculated for the remaining Contract Term of the PPA and must include the value of Environmental Attributes and Capacity Attributes.

Marketable Emission Trading Credits
pursuant to the requirements of California Division 26 Air Resources; Health & Safety Code

Page 465 of 1037 ends

9 Section 39616 and Section 40440.2 for market-based incentive programs such as the South Coast RECLAIM, and allowances of sulfur dioxide trading credits as required under Title IV of the Federal Clean Air Act (42 U.S.C. § 7651b (a) to (f)).

Month
Monthly Costs 9.1.

Monthly Product Payment required to be made by CCP to Project Developer each month of the Delivery Term as compensation for the Product, as calculated in accordance with Exhibit C of the PPA.

MW in alternating current, unless expressly stated in terms of direct current.

MWh -hour measured in alternating current, unless expressly stated in terms of direct current.

Negative LMP Strike Price has the meaning set forth in Section 1.1 of the PPA.

NERC Corporation.

Net Qualifying Capacity NQC
Non-Defaulting Project Participant has the meaning set forth in Section 12.1.

Normal Vote has the meaning set forth in Exhibit D.

Notice erwise specified in the Agreement, mean written communications by a Party to be delivered by hand delivery, United States mail, overnight courier service, or electronic messaging (e-mail).

Operating Account CCP for each Project Participant
pursuant to Section 8.2.

Operating Cost Budget or Amended Annual Budget
attributable to the applicable Month for a Billing Statement plus any Accepted Compliance Costs approved by the CCP Board pursuant to Section 5.2(a)(xiii).

Party .

Payment Default has the meaning set forth in Section 12.2.

Payment Default Termination Deadline eaning set forth in Section 12.6.

Performance Security i) cash or (ii) a Letter of Credit in the amount set forth on the Cover Sheet of the PPA.

Page 466 of 1037 ends

10 Permitted Transferee has the meaning set forth in Section 1.1 of the PPA.

Person individual, sole proprietorship, corporation, limited liability company, limited or general partnership, joint venture, association, joint-stock company, trust, incorporated organization, institution, public benefit corporation, unincorporated organization, government entity or other entity.

Power Purchase Agreement PPA
Developer for the purchase of the electric output of the Fish Lake Geothermal Project, executed on May 31, 2022.

PPA Defaulting Party has the meaning set forth in Section 11.1(a) of the PPA.

PPA Non-Defaulting Party
PMAX -certified maximum operating level of the Facility.

PMIN -certified minimum operating level of the Facility.

PNode
Product in Section 3.1
Progress Report Exhibit E of
the PPA.

Project shall be broadly construed to entail the aggregate of rights, liabilities, interests, and obligations of CCP pursuant to the PPA, including but not limited to all rights, liabilities, interests, and obligations associated with the Product, all rights, liabilities, interests and obligations associated with the Facility, and including all aspects of the operation and administration of the Facility and the PPA and the rights, liabilities, interests and obligations associated therewith.

Project Committee means the committee established in accordance with Section6.1.

Project Developer means Fish Lake Geothermal LLC or assignee as permitted under the PPA.

Project Participants means those entities executing this Agreement, as identified in the Preamble, together in each case with each successors or assigns.

Project Revenue Rights means all rights of a Project Participant under this Agreement to any revenue associated with the Facility Energy, Capacity Attributes, Ancillary Services, or Environmental Attributes associated with the Facility.

Project Rights means all rights and privileges of a Project Participant under this Agreement, including but not limited to its Entitlement Share, its right to receive the Product from the Facility, and its right to vote on Project Committee matters.

Page 467 of 1037 ends

11 Project Rights and Obligations means the
obligations under the terms of this Agreement.

Proposed Entitlement Share Reduction Compensation Amount has the meaning set forth in Exhibit C.

Prudent Operating Practice
required by or consistent with applicable Laws and reliability criteria, and otherwise engaged in or approved by a significant portion of the electric industry during the relevant time period with respect to grid-interconnected, utility-scale generating facilities in the Western United States, and (b) any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Prudent Operating Practice is not intended to be limited to the optimum practice, method, or act to the exclusion of all others, but rather to acceptable practices, methods or acts generally accepted in the industry with respect to grid-interconnected, utility-scale generating facilities in the Western United States. Prudent Operating Practice shall include compliance with applicable Laws, applicable safety and reliability criteria, and the applicable criteria, rules and standards promulgated in the National Electric Safety Code and the National Electrical Code, as they may be amended or superseded from time to time, including the criteria, rules, and standards of any successor organizations.

Qualifying Capacity
RA Compliance Showing
(or similar or successor showings), (b) RAR compliance or advisory showings (or similar or successor showings), and (c) Flexible RAR compliance or advisory showings (or similar successor showings), in each case, an entity is required to make to the CAISO pursuant to the CAISO Tariff, to the CPUC (and, to the extent authorized by the CPUC, to the CAISO) pursuant to the Resource Adequacy Rulings, or to any Governmental Authority.

RA Deficiency Amount has the meaning set forth in Section 1.1 of the PPA.

RA Guarantee Date the date by which the Facility is expected to achieve Full Capacity Deliverability Status, which is the Commercial Operation Date.

RA Shortfall Month has the meaning set forth in Section 1.1 of the PPA.

Real-Time Market Tariff.

Reliability Network Upgrades
Remedial Action Plan set forth in Section 2.4 of the PPA.

Replacement RA has the meaning set forth in Section 1.1 of the PPA.

Resource Adequacy Benefits means the rights and privileges attached to the Facility

Page 468 of 1037 ends

12 ruling issue by a Governmental Authority, including the Resource Adequacy Rulings and shall include Flexible Capacity, and any local, zonal or otherwise locational attributes associated with the Facility.

Resource Adequacy Requirements RAR
requirements applicable to an entity as established by the CAISO pursuant to the CAISO Tariff, by the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority.

Resource Adequacy Resource has the meaning used in Resource Adequacy Rulings.

Resource Adequacy Rulings 04-01-050, 04-10-035,
05-10-042, 06-04-040, 06-06-064, 06-07-031, 07-06-029, 08-06-031, 09-06-028, 10-06-036, 11-06-022, 12-06-025, 13-06-024, 14-06-050, 15-06-063, 16-06-045, 17-06-027, 18-06-030, 18- 06-031, 19-02-022, 19-06-026, 19-10-021, 20-01-004, 20-03-016, 20-06-002, 20-06-031, 20-06- 028, 20-12-006, 21-06-035 and any other existing or subsequent ruling or decision, or any other resource adequacy laws, rules or regulations enacted, adopted or promulgated by any applicable Governmental Authority, however described, as such decisions, rulings, Laws, rules or regulations may be amended or modified from time-to-time throughout the Contract Term.

Schedule Scheduled
corollary meaning.

Scheduled Energy ble CAISO
market based on the final Day-Ahead Schedule(s), FMM Schedule(s) (as defined in the CAISO Tariff), and/or any other financially binding Schedule(s), market instruction or dispatch for the Facility for a given period of time implemented in accordance with the CAISO Tariff.

Scheduling Coordinator SC
as a Scheduling Coordinator pursuant to the CAISO Tariff for the purposes of undertaking the amended from time to time.

Scheduling Coordinator Services Agreement the agreement between CCP and a Scheduling Coordinator that was approved by the CCP Board pursuant to Section 5.2(a)(xiii).

Settlement Interval
Settlement Period
Shared Facilities -tie lines, transformers, substations, or other equipment, permits, contract rights, and other assets and property (real or personal), in each case, as necessary to enable delivery of Energy from the Facility (which is excluded from Shared Facilities) to the point of interconnection, including the Interconnection Agreement itself, that are used in common with third parties.

Shared Facilities Agreements has the meaning set forth in Section 6.3 PPA.

Page 469 of 1037 ends

13 Showing Month means the calendar month of the Delivery Term, commencing with the Showing Month that contains the RA Guarantee Date, that is the subject of the RA Compliance Showing, as set forth in the Resource Adequacy Rulings and outlined in the CAISO Tariff. For illustrative purposes only, pursuant to the CAISO Tariff and Resource Adequacy Rulings in effect as of the Effective Date, the monthly RA Compliance Showing made in June is for the Showing Month of August.

Site has the meaning set forth in Section 1.1 of the PPA, as further described in Exhibit A of the PPA.

Station Use s, motors,
temperature control systems, control systems and other electrical loads that are necessary for operation of the Facility.

Step-Up Allocation Cap has the meaning set forth in Section 12.8(a).

Step-Up Invoice means an invoice sent to a Non-Defaulting Project Participant as a result of Payment Default, which invoice shall separately identify any amount owed with respect to the monthly Billing Statement of the Defaulting Project Participant, as the case may be, pursuant to Section 12.7.

Step-Up Invoice Amount has the meaning set forth in Section 12.7.

Step-Up Invoice Amount Cap has the meaning set forth in Section 12.7.

Step-Up Reserve Account has the meaning set forth in Section 12.7(a)(i).

System Emergency determined, and declared by
CAISO or the Transmission Provider, automatic or immediate action to (i) prevent or limit harm to or loss of life or property, (ii) prevent loss of transmission facilities or generation supply in the immediate vicinity of the Facility, or (iii) to preserve Transmission System reliability.

Tax Taxes , and any foreign taxes, levies,
assessments, surcharges, duties and other fees and charges of any nature imposed by a Governmental Authority, whether currently in effect or adopted during the Contract Term, including ad valorem, excise, franchise, gross receipts, import/export, license, property, sales and use, stamp, transfer, payroll, unemployment, income, and any and all items of withholding, deficiency, penalty, additions, interest or assessment related thereto.

Tax Credits n
benefit, tax deduction and/or investment tax credit, including the ITC, specific to investments in renewable energy facilities and/or energy storage facilities.

Terminated Transaction 11.2(a) the PPA.

Termination Payment 11.3 of the PPA.

Page 470 of 1037 ends

14 Transmission Provider operates, and maintains
transmission or distribution lines and associated facilities and/or has entitlements to use certain transmission or distribution lines and associated facilities for the purpose of transmitting or transporting the Facility Energy from the Delivery Point.

Transmission System
hereafter in existence, which provide energy transmission service downstream from the Delivery Point.

Unanimous Vote has the meaning set forth in Exhibit D.

Uncontrollable Forces Force Majeure event and any cause beyond the control of any Party, which by the exercise of due diligence such Party is unable to prevent or overcome, including but not limited to, failure or refusal of any other Person to comply with then existing contracts, an act of God, fire, flood, explosion, earthquake, strike, sabotage, epidemic or pandemic (excluding impacts of the disease designated COVID-19 or the related virus designated SARS-CoV-2 impacts actually known by the Party claiming the Force Majeure Event as of the Effective Date), an act of the public enemy (including terrorism), civil or military authority including court orders, injunctions and orders of governmental agencies with proper jurisdiction or the failure of such agencies to act, insurrection or riot, an act of the elements, failure of equipment, a failure of any governmental entity to issue a requested order, licenseor permit, inability of any Party or any Person engaged in work on the Project to obtain or ship materials or equipment because of the effect of similar causes on suppliers or carriers. Notwithstanding the foregoing, Uncontrollable Forces as defined herein shall also include events of Force Majeure pursuant to the PPA, as defined therein.

1.2. Rules of Interpretation. In this Agreement, except as expressly stated otherwise or unless the context otherwise requires:
(a) headings and the rendering of text in bold and italics are for convenience and reference purposes only and do not affect the meaning or interpretation of this Agreement; (b) words importing the singular include the plural and vice versa and the masculine, feminine and neuter genders include all genders; (c)
shall refer to this Agreement as a whole and not to any particular provision of this Agreement; (d) a reference to an Article, Section, paragraph, clause, Party, or Exhibit is a reference to that Article, Section, paragraph, clause of, or that Party or Exhibit to, this Agreement unless otherwise specified;
(e) a reference to a document or agreement, including this Agreement shall mean such document, agreement or this Agreement including any amendment or supplement to, or replacement, novation, or modification of this Agreement, but disregarding any amendment, supplement, replacement, novation or modification made in breach of such document, agreement or this Agreement;

Page 471 of 1037 ends

15 assigns;
(f)
(g)
restrict or limit the generality of the word or provision in respect of which such examples are provided;
(h) references to any statute, code or statutory provision are to be construed as a reference to the same as it may have been, or may from time to time be, amended, modified, or reenacted, and include references to all bylaws, instruments, orders and regulations for the time being made thereunder or deriving validity therefrom unless the context otherwise requires; (i) in the event of a conflict, a mathematical formula or other precise description of a concept or a term shall prevail over words providing a more general description of a concept or a term;
(j) references to any amount of money shall mean a reference to the amount in United States Dollars;
(k)
(l) words, phrases or expressions not otherwise defined herein that (i) have a generally accepted meaning in Prudent Operating Practice shall have such meaning in this Agreement or (ii) do not have well known and generally accepted meaning in Prudent Operating Practice but that have well known and generally accepted technical or trade meanings, shall have such recognized meanings;
(m) each Party acknowledges that it was represented by counsel in connection with this Agreement and that it or its counsel reviewed this Agreement and that any rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this Agreement; and
(n) in the event of any conflict or inconsistency between the terms of this Agreement and the terms of the PPA, the terms and provisions of this Agreement shall control.

ARTICLE 2

EFFECTIVE DATE AND TERM

2.1. Term.
(a) The term of this Agreement shall commence on the Effective Date and shall remain in full force and effect until the occurrence of all of the following: (i) the termination of the PPA and (ii) the termination of the Buyer Liability Pass Through Agreement for all the Project Participants, and (iii) all Parties have met their obligations under this Agreement Term .

Page 472 of 1037 ends

16 (b) Applicable provisions of this Agreement shall continue in effect after termination to the extent necessary to enforce or complete the duties, obligations or responsibilities of the Parties arising prior to termination. All indemnity and audit rights shall remain in full force and effect for three (3) years following the termination of this Agreement.

ARTICLE 3

AGREEMENT

3.1. Transaction. Subject to the terms and conditions of this Agreement, the Project Participants authorize CCP to purchase all Facility Energy, Capacity Attributes, Ancillary Services, and Environmental Attributes associated with the Facility and any Replacement RA provided pursuant to the PPA Product , on behalf of the Project Participants.

CCP shall cause Project Developer to deliver each Entitlement Share of the Product to such Project Participant, including but not limited to (i) any revenue associated with the Facility Energy, Capacity Attributes, Ancillary Services, or Environmental Attributes associated with the Facility, and (ii) the Capacity Attributes and Environmental Attributes associated with the Facility or otherwise provided to CCP pursuant to the PPA. To the extent that any Facility Energy, Capacity Attributes, Ancillary Services, or Environmental Attributes associated with the Project or any Replacement RA are delivered to CCP, then CCP shall transfer each Entitlement Share of such Facility Energy, Capacity Attributes, Ancillary Services, or Environmental Attributes to the Project Participants. CCP shall cause all Facility Energy and associated Environmental Attributes delivered to the Project Participants by the Project Developer, and shall deliver to the Project Participants all Facility Energy and associated Environmental Attributes that CCP receives from the Project Developer, on a fully bundled basis in order to meet the requirements of the portfolio content set forth in California Public Utilities Code Section 399.16(b)(1). CCP shall administer the PPA and oversee the operation of the Project. CCP shall not sell, assign, or otherwise transfer any Product, or any portion thereof, to any third party other than to the Project Participants, unless authorized by the Project Participants pursuant to this Agreement.

3.2. RPS Compliance.
(a) CCP represents and warrants that:
(i) the Product purchased by CCP on behalf of the Project Participants consists of Energy and Environmental Attributes from only Eligible Renewable Energy Resources of the portfolio content set forth in California Public Utilities Code Section 399.16(b)(1); (ii) the Energy and Environmental Attributes that are delivered to Project Participants by Project Developer, or delivered to Project Participants by CCP to the extent Project Developer delivers Energy and Environmental Attributes to CCP, consists only of Energy and Environmental Attributes that have not yet been generated prior to the commencement of the term of the PPA or the Effective Date of this Agreement; (iii) the Energy that is delivered to Project Participants by Project Developer, or delivered to Project Participants by CCP to the extent Project Developer delivers Energy to CCP, shall be transferred to each Project Participant in real time; and

Page 473 of 1037 ends

17 (b) If the PPA includes an agreement to dynamically transfer electricity to a California balancing authority, then any transactions implemented under this Agreement are not contrary to any condition imposed by a balancing authority participating in the dynamic transfer arrangement.

ARTICLE 4

ENTITLEMENT SHARE

4.1. Initial Entitlement Share.
the Effective Date shall be set forth in Column B of the Table provided in Exhibit B of this Agreement and Step-Up Allocation
Caps Any revisions to the Entitlement Share specified in Exhibit B pursuant to Section 4.2. or Section 12.8 shall be considered an element of the administration of this Agreement and shall not require the consent of the Parties hereto.

4.1. Change of Entitlement Share. Any Project Participant may reduce its Entitlement Share of the Project pursuant to the process set forth in Exhibit C.

4.2. Reduction of Entitlement Share to Zero
Share is reduced to zero through any process specified in Exhibit C, such Project Participant shall remain a Party to this Agreement and shall be subject to all rights, obligations, and liabilities of this Agreement, including but not limited to any liabilities for Monthly Product Payments, Damage Payment, or Termination Payment, as applicable, and any other damage payments or reimbursement amounts under the PPA.

ARTICLE 5
OBLIGATIONS OF CCP; ROLE OF CCP BOARD AND CCP MANAGER

5.1. Obligations of CCP.
(a) CCP shall take such commercially reasonable actions or implement such commercially reasonable measures as may be necessary or desirable for the utilization, maintenance, or preservation of the rights and interests of the Project Participants in the Project including, if appropriate, such enforcement actions or other measures as the Project Committee or CCP Board deems To the extent not inconsistent
with the PPA or other applicable agreements, CCP may also be authorized by the Project Participants to assume responsibilities for planning, designing, financing, developing, acquiring, insuring, contracting for, administering, operating, and maintaining the Project to effectuate the conveyance of the Product to Project Participants
Entitlement Shares.
(b) To the extent such services are available and can be carried forth in accordance with the PPA, CCP shall also provide such other services, as approved by the Project Committee or CCP Board, as may be deemed necessary to secure the benefits and/or satisfy the obligations associated with the PPA.

Page 474 of 1037 ends

18 (c) Adoption of Annual Budget. The Annual Budget and any amendments to the Annual Budget shall be prepared and approved in accordance with this Section 5.1(c). (i) The CCP Manager will prepare and submit to the Project Committee a proposed Annual Budget at least ninety (90) days prior to the beginning of each Contract Year during the term of this Agreement. The proposed Annual Budget shall be based on the prior actual costs and shall include reasonable estimates of the costs CCP expects to incur during the applicable Contract Year in association with the administration of the PPA, including the cost of insurance coverages that are determined to be attributable to the Project by action of the CCP Board. Upon approval of the proposed Annual Budget by a Normal Vote of the Project Committee, the CCP Manager shall present the proposed Annual Budget to the CCP Board.

The CCP Board shall adopt the Annual Budget no later than thirty (30) days prior to the beginning of such Contract Year and shall cause copies of such adopted Annual Budget to be delivered to each Project Participant.
(ii) At any time after the adoption of the Annual Budget for a Contract Year, the CCP Manager may prepare and submit to the Project Committee a proposed Amended Annual Budget for and applicable to the remainder of such Contract Year. The proposal shall (A) explain why an amendment to the Annual Budget is needed, (B) compare estimated costs against actual costs, and (C) describe the events that triggered the need for additional funding. Upon approval of the proposed Amended Annual Budget by a Normal Vote of the Project Committee, the CCP Manager shall present the proposed Amended Annual Budget to the CCP Board. Upon adoption of the Amended Annual Budget by the CCP Board, such Amended Annual Budget shall apply to the remainder of the Contract Year and the CCP Board shall cause copies of such adopted Amended Annual Budget to be delivered to each Project Participant. (iii) Reports. CCP will prepare and issue to Project Participants the following reports each quarter of a year during the Term:
(A) Financial and operating statement relating to the Project. (B) Variance report comparing the costs in the Annual Budget versus actual costs, and the status of other cost-related issues with respect to the Project. (d) Records and Accounts. CCP will keep, or cause to be kept, accurate records and accounts of the Project as well as of the operations relating to the Project, all in a manner similar to accepted accounting methodologies associated with similar projects. All transactions of CCP relating to the Project with respect to each Contract Year shall be subject to an annual audit.

Each Project Participant shall have the right at its own expense to examine and copy the records and accounts referred to above on reasonable notice during regular business hours. (e) Information Sharing. each Project Participant agrees to coordinate with CCP to provide such information, documentation, and certifications that are reasonably necessary for the design, financing, refinancing, development, operation, administration, maintenance, and ongoing activities of the Project, including information required to respond to requests for such information from any federal, state, or local regulatory body or other authority.

Page 475 of 1037 ends

19 (f) Consultants and Advisors Available. CCP shall make available to the Project Committee all consultants and advisors, including financial advisors and legal counsel that are retained by CCP, and such consultants, counsel and advisors shall be authorized to consult with and advise the Project Committee on Project matters. CCP agrees to waive any conflicts of interest or any other applicable professional standards or rules as required by consultants, counsel, and advisors to advise the Project Committee on Project matters. (g) Deposit of Insurance Proceeds. CCP shall promptly deposit any insurance proceeds received by CCP from any insurance obtained pursuant to this Agreement or otherwise associated with the Project into the Operating Accounts of the Project Participants based on each Shares.
(h) Liquidated and Other Damages. Any amounts paid to CCP, or applied against payments otherwise due by CCP pursuant to the PPA respective BLPTA, by the Project Developer shall be deposited on a pro rata share, based on each Liquidated damages include, but are not limited to Daily Delay Damages, RA Deficiency Amount, Capacity Damages, Guaranteed Energy Production Damages, Damage Payment, and Termination Payment.
(i) Environmental Attributes. CCP shall take such actions or implement such measures as may be necessary to facilitate the transfer of Environmental Attributes from the Project Developer to the Project Participants.
(j) Resale of Product. Any Project Participant may direct CCP to remarketsuch of the Product, or
Share of any part of the Product. If CCP incurs any expenses associated with the remarketing activities pursuant to this Section 5.1(j), then CCP shall include the total amount of such expenses Prior to offering the Project
P of Entitlement Share of
any part of the Product to any third party, CCP shall first offer the Product or portion of the Product to the other Project Participants. The amount of compensation paid to the selling Project Participant shall be negotiated and agreed to between the selling Project Participant and the purchasing Project Participant or third party. Any payments for any resold Product pursuant to this Section 5.1(j) shall be transmitted directly from the purchasing Project Participant or purchasing third party to the reselling Project Participant. Any such resale to a third party shall not convey any rights or authority over the operation of the Project, and the Project Participant shall not make a representation to the third party that the resale conveys any rights or authority over the operation of the Project.
(k) Uncontrollable Forces. CCP shall not be required to provide, and CCP shall not be liable for failure to provide, the Product, Replacement RA, or other service under this Agreement when such failure, or the cessation or curtailment of, or interference with, the service is caused by Uncontrollable Forces or by the failure of the Project Developer, or its successors or assigns, to obtain any required governmental permits, licenses, or approvals to acquire, administer, or operate the Project; provided, however, that the Project Participants shall not thereby be relieved of their obligations to make payments under this Agreement except to the

Page 476 of 1037 ends

20 extent CCP is so relieved pursuant to the PPA, and provided further that CCP shall pursue all applicable remedies against the Project Developer under the PPA and distribute any remedies obtained pursuant to Section 5.1(h).
(l) Insurance. Within one hundred and eighty days (180) of the Effective Date of this Agreement, CCP shall secure and maintain, during the Term, insurance coverage as follows:
(i) Commercial General Liability. CCP shall maintain, or cause to be maintained, commercial general liability insurance, including products and completed operations and personal injury insurance, in a minimum amount of One Million Dollars ($1,000,000) per occurrence, and an annual aggregate of not less than Two Million Dollars ($2,000,000), endorsed Agreement and including each Project Participant as an additional insured. (ii) . CCP, if it has employees, shall
($1,000,000.00) for injury or death occurring as a result of each accident. With regard to bodily injury by disease, the One Million Dollar ($1,000,000) policy limit will apply to each employee. (iii) Workers Compensation Insurance. CCP, if it has employees, shall less than One Million Dollars ($1,000,000.00) for each accident, injury, or illness; and include a blanket waiver of subrogation.
(iv) Business Auto Insurance. CCP shall maintain at all times during the Term business auto insurance for bodily injury and property damage with limits of One Million Dollars ($1,000,000) per occurrence. Such insurance shall cover liability arising out of CCP of all owned (if any), non-owned and hired vehicles, including trailers or semi-trailers in the performance of the Agreement and shall name each Project Participant as an additional insured and contain standard cross-liability and severability of interest provisions. (v) Public Entity Liability Insurance. CCP shall maintain public entity liability insurance ity reimbursement
insurance, and employment practices liability insurance in an amount not less than One Million Dollars ($1,000,000) per claim, and an annual aggregate of not less than One Million Dollars ($1,000,000) and CCP shall maintain such coverage for at least two (2) years from the termination of this Agreement.
(m) Evidence of Insurance. Within ten (10) days after the deadline for securing insurance coverage specified in Section 5.1(l), and upon annual renewal thereafter, CCP shall deliver to each Project Participant certificates of insurance evidencing such coverage with insurers with ratings comparable to A-VII or higher, and that are authorized to do business in the State of California, in a form evidencing all coverages set forth above. Such certificates shall specify that each Project Participant shall be given at least thirty (30) days prior Notice by CCP in the event of cancellation or termination of coverage. Such insurance shall be primary coverage without right of contribution from any insurance of each Project Participant. Any other insurance maintained by

Page 477 of 1037 ends

21 CCP not associated with this Agreement is for the exclusive benefit of CCP and shall not in any manner inure to the benefit of Project Participants.
compensation policies shall be endorsed with a waiver of subrogation in favor of each Project Participant for all work performed by CCP, its employees, agents and sub-contractors.

5.2. Role of CCP Board.
(a) The rights and obligations of CCP under the PPA shall be subject to the ultimate control at all times of the CCP Board. The CCP Board, shall have, in addition to the duties and responsibilities set forth elsewhere in this Agreement, the following duties and responsibilities, among others:
(i) Dispute Resolution. The CCP Board shall review, discuss and attempt to resolve any disputes among CCP, any of the Project Participants, and the Project Developer relating to the Project, the operation and management of the Facility, and CCP rights and interests in the Facility.
(ii) PPA. The CCP Board shall have the authority to review, modify, and approve, as appropriate, all amendments, modifications, and supplements to the PPA. (iii) Capital Improvements. The CCP Board shall review, modify, and approve, if appropriate, all Capital Improvements undertaken with respect to the Project and all financing arrangements for such Capital Improvements. The CCP Board shall approve those budgets or other provisions for the payments associated with the Project and the financing for any development associated with the Project.
(iv) Committees. The CCP Board shall exercise such review, direction, or oversight as may be appropriate with respect to the Project Committee and any other committees established pursuant to this Agreement.
(v) Budgeting. Upon the submission of a proposed Annual Budget or proposed Amended Annual Budget, approved by a Normal Vote of the Project Committee, the CCP Board shall review, modify, and approve each Annual Budget and Amended Annual Budget in accordance with Section 5.1(c) of this Agreement.
(vi) Early Termination of PPA. The CCP Board shall review, modify, and approve the recommendations of the Project Committee, made pursuant to Section 6.4(b)(ii) of this Agreement, as to an early termination of the PPA pursuant to Section 11.2 of the PPA. (vii) Assignment by Project Developer. The CCP Board shall review, modify, and approve the recommendations of the Project Committee, made pursuant to Section

6.4(b)(iii) of this Agreement, as to any assignment by Project Developer pursuant to Section 14.1 of the PPA other than any assignment pursuant to Sections 14.2 or 14.3 of the PPA. (viii) Buyer Financing Assignment. The CCP Board shall review, modify, and approve the recommendations of the Project Committee, made pursuant to Section 6.4(b)(iv) of this Agreement, as to an assignment by CCP to a financing entity.

Page 478 of 1037 ends

22 (ix) Change of Control. The CCP Board shall review, modify, and approve the recommendations of the Project Committee, made pursuant to Section 6.4(b)(v) of this Agreement, as to any Change of Control requiring
of the PPA.
(x) Supervening Authority of the Board. The CCP Board has complete and plenary supervening power and authority to act upon any matter which is capable of being acted upon by the Project Committee or which is specified as being within the authority of the Project Committee pursuant to the provisions of this Agreement. (xi) Other Matters. The CCP Board is authorized to perform such other functions and duties, including oversight of those matters and responsibilities addressed by the Project Committee or CCP Manager as may be provided for under this Agreement and under the PPA, or as may otherwise be appropriate.
(xii) Periodic Audits. The CCP Board or the Project Committee may arrange for the annual audit by certified accountants, selected by the CCP Board and experienced in electric generation or electric utility accounting, of the books and accounting records of CCP, the Project Developer to the extent authorized under the PPA, and any other counterparty under any agreement to the extent allowable, and such audit shall be completed and submitted to the CCP Board as soon as reasonably practicable after the close of the Contract Year. CCP shall promptly furnish to the Project Participant copies of all audits. No more frequently than once every calendar year, each Project Participant may, at its sole cost and expense, audit, or cause to be audited the books and cost records of CCP, and/or the Project Developer to the extent authorized under the PPA.
(xiii) Compliance Expenditures. The CCP Board shall review, modify, and approve the recommendations of the Project Committee, made pursuant to Section 6.4(b)(vi) of this Agreement, as to Compliance Expenditures, as specified in Section 3.12(c), (d), and (e) of the PPA. If the CCP Board authorizes CCP to agree to reimburse Project Developer for Accepted Compliance Costs, then such amount shall be added to the amount of Operating Costs included in the Monthly Cost calculation for the subsequent month.
(b) Pursuant to Section 5.06 of the Joint Powers Agreement, this Agreement modifies the voting rules of the CCP Board for purposes of approving or acting on any matter identified in this Agreement, as follows:
(i) Quorum. A quorum shall consist of a majority of the CCP Board members that represent Project Participants.
(ii) Voting. Each CCP Board member that represents a Project Participant shall have one vote for any matter identified in this Agreement. Any CCP Board member representing a CCP member that is not a Project Participant shall abstain from voting on any matter identified in this Agreement. A vote of the majority of the CCP Board members representing Project Participants that are in attendance shall be sufficient to constitute action, provided a quorum is established and maintained.

5.3. Role of CCP Manager.

Page 479 of 1037 ends

23 (a) In addition to the duties and responsibilities set forth elsewhere in this Agreement, the CCP Manager is delegated the following authorities and responsibilities:
(i) Request for Tax Documentation. Respond to any requests for tax-related documentation by the Project Developer. (ii) Request for Financial Statements. Provide the Project Developer with Financial Statements as may be required by the PPA. (iii) Request for Information by Project Participant. Respond to any request by a Project Participant for information or documents that are reasonably available to allow the Project Participant to respond to requests for such information from any federal, state, or local regulatory body or other authority.
(iv) Coordinate Response to a Request for Confidential Information.

Upon a request or demand by any third person that is not a Party to the PPA or a Project Participant, for Confidential Information as described in Section 18.2 of the PPA, the CCP Manager shall notify the Project Developer and coordinate the response of CCP and Project Participants. (v) Invoices. The CCP Manager shall review each invoice submitted by Project Developer and shall request such other data necessary to support the review of such invoices.

ARTICLE 6

PROJECT COMMITTEE

6.1. Establishment and Authorization of the Project Committee. The Project Committee is hereby established and duly authorized to act on behalf of the Project Participants as provided for in this Section 6 for the purpose of (a) providing coordination among, and information to, the Project Participants and CCP, (b) making any recommendations to the CCP Board regarding the administration of the Project, and (c) execution of the Project Committee responsibilities set forth in Section 6.4.

6.2. Project Committee Membership. The Project Committee shall consist of one representative from each Project Participant. The CCP Manager shall be a non-voting member of the Project Committee. Within thirty (30) days after the Effective Date, each Project Participant shall provide notice to each other of such representative on the Project Committee. Alternate representatives may be appointed by similar written notice to act on the Project Committee, or on any subcommittee established by the Project Committee, in the absence of the regular representative. An alternate representative may attend all meetings of the Project Committee but may vote only if the representative for whom they serve as alternate for is absent. shall exercise any greater authority than permitted by the Project Participant which they represent.

6.1. Project Committee Operations, Meetings, and Voting. Project Committee operations, meetings, and voting shall be in accordance with the procedures and requirements specified in Exhibit D.

Page 480 of 1037 ends

24 6.2. Project Committee Responsibilities. The Project Committee shall have the following responsibilities:
(a) General Responsibilities of the Project Committee.
(i) Provide a liaison between CCP and the Project Participants with respect to the ongoing administration of the Project.
(ii) Exercise general supervision over any subcommittee established pursuant to Section 6.5.
(iii) Oversee, as appropriate, the completion of any Project design, feasibility, or planning studies or activities.
(iv) Review, discuss, and attempt to resolve any disputes among the Project Participants relating to this Agreement or the PPA. (v) Perform such other functions and duties as may be provided for under this Agreement, the PPA, or as may otherwise be appropriate or beneficial to the Project or the Project Participants.
(b) Recommendations to the CCP Board by a Normal Vote.
(i) Budgeting. Review, modify, and approve by a Normal Vote each proposed Annual Budget and proposed Amended Annual Budget for submission to the CCP Board for final approval.
(ii) Early Termination of PPA. Review, modify, and approve by a Normal Vote a recommendation to the CCP Board regarding an early termination of the PPA pursuant to Section 11.2 of the PPA.
(iii) Assignment by Project Developer. Review, modify, and approve by a Normal Vote a recommendation to the CCP Board regarding any assignment by Project Developer pursuant to Section 14.1 of the PPA other than any assignment pursuant to Sections

14.2 or 14.3 of the PPA.
(iv) Buyer Financing Assignment. Review, modify, and approve by a Normal Vote a recommendation to the CCP Board regarding an assignment by CCP to a financing entity.
(v) Change of Control. Review, modify, and approve by a Normal Vote a recommendation to the CCP Board regarding
as specified in Section 14.1 of the PPA.
(vi) Compliance Expenditures. Review, modify, and approve by a Normal Vote a recommendation to the CCP Board regarding Compliance Expenditures, as specified in Section 3.12(c), (d), and (e) of the PPA.

Page 481 of 1037 ends

25 (c) Actions Delegated to the Project Committee by this Agreement Subject to a Unanimous Vote.
(i) Project Design. Review, modify, and approve by a Unanimous Vote any recommendations to the Project Developer on the design of the Project. (ii) Extension of Guaranteed Construction Start Date and Guaranteed Commercial Operation Date. Review and confirm that requirements of Exhibit B of the PPA have been satisfied, such that the Guaranteed Construction Start Date and/or Guaranteed Commercial Operation Date has been extended.
(iii) Event of Default. Direct CCP to exercise its rights under the PPA if an Event of Default has occurred under Section 11.1 of the PPA. (d) Actions Delegated to the Project Committee by this Agreement Subject to a Normal Vote.
(i) Make recommendations to the CCP Manager, the CCP Board, the Project Participants or to the Project Developer, as appropriate, with respect to the development, operation, and ongoing administration of the Project.
(ii) Review, develop, and, if appropriate, modify and approve rules, procedures, and protocols for the administration of the Project, including rules, procedures, and protocols for the management of the costs of the Facility and the scheduling, handling, tagging, dispatching, and crediting of the Product, the handling and crediting of Environmental Attributes associated with the Facility and the control and use of the Facility. (iii) Review, develop, and, if appropriate, modify rules, procedures, and protocols for the monitoring, inspection, and the exercise of due diligence activities relating to the operation of the Facility.
(iv) Review, and, if appropriate, modify or otherwise act upon, the form or content of any written statistical, administrative, or operational reports, Facility-related data and technical information, facility reliability data, transmission information, forecasting, scheduling, dispatching, tagging, parking, firming, exchanging, balancing, movement, or other delivery information, and similar information and records, or matters pertaining to the Project which are furnished to the Project Committee by the CCP Manager, the Project Developer, experts, consultants or others.
(v) Review, formulate, and, if appropriate, modify, or otherwise act upon, practices and procedures to be followed by Project Participants for, among other things, the production, scheduling, tagging, transmission, delivery, firming, balancing, exchanging, crediting, tracking, monitoring, remarketing, sale, or disposition of the Product, including the control and use of the Facility.
(vi) Review and act upon any matters involving any arrangements and instruments entered into by the Project Developer or any affiliate thereof to, among other things, secure certain performance requirements, including, but not limited to, the PPA, the Development

Page 482 of 1037 ends

26 Security or the Performance Security and any other letter of credit delivered to, or for the benefit of, CCP by the Project Developer and take such actions or make such recommendations as may be appropriate or desirable in connection therewith.
(vii) Review, and, if appropriate, recommend, modify, or approve policies or programs formulated by CCP or Project Developer for determining or estimating the values, quantities, volumes, or costs of the Product from the Facility. (viii) Review, and where appropriate, recommend the implementation of metering technologies and methodologies appropriate for the delivery, accounting for, transferring and crediting of the Product to the Point of Delivery (directly or through the Facility). (ix) Review, to the extent permitted by this Agreement, the PPA, or any other relevant agreement relating to the Project, modify and approve or disapprove the evaluations, or any other matters with respect to the
Facility.
(x) Review and approve any Remedial Action Plan submitted by Project Developer to CCP pursuant to Section 2.4 of the PPA.
(xi) Review and approve the submission of the written
acknowledgement of the Commercial Operation Date in accordance with Section 2.2 of the PPA. (xii) Review and approve the return of the Development Security to Project Developer in accordance with Section 8.8 of the PPA. (xiii) Review and approve the return of any unused Performance Security to Project Developer in accordance with Section 8.9 of the PPA. (xiv) Review Progress Reports provided by Project Developer to CCP pursuant to Section 2.3 of the PPA and participate in any associated regularly scheduled meetings with Project Developer to discuss construction progress. (xv) Direct CCP to collect any liquidated damages owed by Project Developer to CCP under the PPA, and to the extent authorized by PPA, draw upon the Development Security or Performance Security.
(xvi) Review invoices received by CCP from the Project Developer and, if appropriate, direct CCP to dispute an invoice pursuant to Section 8.5 of the PPA. (xvii) Review and approve the return of the CP Security to Project Developer in accordance with Section 8.7 of the PPA.
(xviii) Review and approve the submission of the Pseudo-tie Participating Generator Agreement in accordance with Section 2.2(b) of the PPA. (xix) Review and approve the submission of the Meter Service Agreement in accordance with Section 2.2(c) of the PPA.

Page 483 of 1037 ends

27 (xx) Review and approve the submission of the Interconnection Agreement in accordance with Section 2.2(d) of the PPA. (xxi) Review and confirm that Project Developer has secured the required Firm Transmission Rights in accordance with Section 2.2(f) of the PPA. (xxii) Review and confirm that Project Developer has received CEC Precertification for the Facility in accordance with Section 2.2(g) of the PPA. (xxiii) Direct CCP request that Project Developer submit a Green-e® Energy Tracking Attestation Form the Product delivered under the PPA to the Center for Resource Solutions pursuant to Section 4.10 of the PPA.
(xxiv) Direct CCP change the Negative LMP Strike Price in pursuant to subdivisions (e) of Exhibit C of the PPA.
(xxv) Direct CCP to take such actions or implement such measures as may be necessary to facilitate the transfer of Environmental Attributes from the Project Developer to the Project Participants.

6.3. Subcommittees. The CCP Manager may establish as needed subcommittees including, but not limited to, auditing, legal, financial, engineering, mechanical, weather, geologic, diurnal, barometric, meteorological, operating, insurance, governmental relations, environmental, and public information subcommittees. The authority, membership, and duties of any subcommittee shall be established by the CCP Manager; provided, however, such authority, membership or duties shall not conflict with the provisions of the PPA or this Agreement.

6.4. Representat . Any expenses incurred by any representative of any Project Participant or group of Project Participants serving on the Project Committee or any other committee in connection with their duties on such committee shall be the responsibility of the Project Participant which they represent and shall not be an expense payable under this Agreement.

6.5. Inaction by Committee. It is recognized by CCP and Project Participants that if the Project Committee is unable or fails to agree with respect to any matter or dispute which it is authorized to determine, resolve, approve, disapprove or otherwise act upon after a reasonable opportunity to do so, or within the time specified herein or in the PPA, then CCP may take such commercially reasonable action as CCP determines is necessary for its timely performance under any requirement pursuant to the PPA or this Agreement, pending the resolution of any such inability or failure to agree, but nothing herein shall be construed to allow CCP to act in violation of the express terms of the PPA or this Agreement.

6.6. Delegation. To secure the effective cooperation and interchange of information in a timely manner in connection with various administrative, technical, and other matters which may arise from time to time in connection with administration of the PPA, in appropriate cases, duties and responsibilities of the CCP Board or the Project Committee, as the case may be under this Section 6, may be delegated to the CCP Manager by the CCP Board upon notice to the Project Participants.

Page 484 of 1037 ends

ARTICLE 7
28 [RESERVED]
ARTICLE 8

OPERATING ACCOUNT

8.1. Calculation of Estimated Monthly Project Cost.
(a) No later than one hundred and eighty (180) days after the Effective Date, the CCP Manager shall present to the Project Committee a proposed Estimated Monthly Project Cost, which shall be equal to the single highest forecasted Monthly Cost over the first Contract Year. The Project Committee shall review, and, if appropriate, recommend, modify, or approve through a Normal Vote, the proposed Estimated Monthly Project Cost.

8.2. Operating Account. CCP shall establish an Operating Account for each Project Participant that is accessible to and can be drawn upon by both CCP and the applicable Project Participant. Such Operating Accounts are for the purpose of providing a reliable source of funds for the payment obligations of the Project and, taking into account the variability of costs associated with the Project for the purpose of providing a reliable payment mechanism to address the ongoing costs associated with the Project.
(a) Operating Account Amount. The Operating Account Amount for each Project Participant shall be an amount equal to the Estimated Monthly Project Cost multiplied by three (3)
Operating Account Amount
(b) Initial Funding of Operating Account. By no later than three hundred and sixty-five (365) days after the Effective Date, each Project Participant shall deposit into such Operating
Account Amount.
(c) Use of Operating Account. CCP shall draw upon each
Operating Account each month in an amount equal to the Monthly Costs multiplied by such Project . As required by Section 9.5, each Project Participant must deposit sufficient funds into
Section 9.5.
(d) Final Distribution of Operating Account. Following the expiration or earlier termination of the PPA, and upon payment and satisfaction of any and all liabilities and obligations to make payments of the Project Participants under this Agreement and upon satisfaction of all remaining costs and obligations of CCP under the PPA, any amounts then e associated Project
Participant.

Page 485 of 1037 ends

ARTICLE 9
29 BILLING

9.1. Monthly Costs. The amount of Monthly Costs for a particular Month shall be the sum of the Project Participant s Entitlement Share multiplied by the Monthly Product Payments for the Product, as specified in Section 8.2 of the PPA for such Month and to the extent such payment is made by CCP to the Project Developer,
multiplied by the Operating Cost for such Month and su
Entitlement Share multiplied by the positive revenue associated with the sale of any Facility Energy, Capacity Attributes, Ancillary Services, and/or Environmental Attributes, as shown in the following formula:

Monthly Product Payment
Share) × (Operating Costs)) Entitlement Share) × (revenue from sale of Facility Energy, Capacity Attributes, Ancillary Services and/or Environmental Attributes))

9.2. Billing Statements. By no later than ten (10) calendar days after CCP receives an invoice from Project Developer for the prior Month of each Contract Year pursuant to Section 8.1 of the PPA, CCP shall issue to each Project Participant a copy of the invoice and a Billing Statement specifies Monthly Costs, itemized by each part of such Monthly Cost. The amount of Monthly Costs attributable to a Project Participant, and Invoice Amount

9.3. Disputed Monthly Billing Statement. A Project Participant may dispute, by written Notice to CCP, any portion of any Billing Statement submitted to that Project Participant by CCP pursuant to Section 9.2, provided that the Project Participantshall pay the full amount of the Billing Statement when due. If CCP determines that any portion of the Billing Statement is incorrect, CCP will deposit the difference between such correct amount and such full amount, if any, including interest at the rate received by CCP on any overpayment Operating Account. If CCP and a Project Participant disagree regarding the accuracy of a Billing Statement, CCP will give consideration to such dispute and will advise all Project Participants with regard thirty (30) days following receipt of written Notice by Project Participant of such dispute.

9.4. Payment Adjustments; Billing Errors. If CCP or Project Developer determines that a prior invoice or Billing Statement was inaccurate, CCP shall credit against or increase as appropriate each Project subsequent Monthly Costs according to such adjustment.

The accompanying Billing Statement shall describe the cause of such adjustment and the amount of such adjustment.

9.5. Payment of Invoice Amount. Each Project Participant shall deposit the Invoice Amount for the applicable Month by no later
than the twentieth (20th) calendar day of the following Month after the Billing Statement is issued, unless CCP has failed to issue the Billing Statement by the deadline specified in Section 9.2, in which case, each Project Participant shall deposit the Invoice Amount for the applicable Month by no later than thirty (30) days after the date on which CCP issues the Billing Statement to the Project Participant.

Page 486 of 1037 ends

30 9.6. Withdrawal of Invoice Amount from Operating Account. No sooner than five (5) calendar days after CCP issues a Billing Statement to a Project Participant or a Step-Up Invoice to a Project Participant, CCP shall withdraw the Invoice Amount or the Step-Up Invoice Amount from each
Project Participant is a negative number, CCP shall deposit such funds into the Operating Account of that Project Participant.

9.7. Late Payments.
(a) If any Project Participant fails to deposit the Invoice Amount into the 5, then CCP will
issue such Project Participant a Late Payment Notice within five (5) days of the deadline specified in Section 9.5 directing the Project Participant to immediately deposit the Invoice Amount into the and informing the Project Participant that such Project Participant must pay a charge ( Late Payment Charge ). Upon issuing a Late Payment Notice to any Project Participant, CCP shall promptly provide Notice of such occurrence to all other Project Participants.
(b) The Late Payment Charge shall be equal to the Invoice Amount minus any partial payment that was deposited into Operating Account multiplied by the Interest Rate specified in Section 8.2 of the PPA for the period from the deadline specified in Section 9.5 until the date on which the Project Participant deposits the Invoice Amount plus the Late Payment Charge into Operating Account. Upon payment, CCP shall withdraw the full amount of such Late Payment Charge Operating Account and deposit any such Late Payment Charge into the Operating Accounts of all other Project Participants on a pro rata share, based on such other Project Participants Entitlement Shares.

ARTICLE 10
UNCONDITIONAL PAYMENT OBLIGATIONS; AUTHORIZATIONS; CONFLICTS; LITIGATION.

10.1. Unconditional Payment Obligation. Beginning with the earliest of (i) the date CCP is obligated to pay any portion of the costs of the Project, (ii) the date of the COD, or (iii) the date of the first delivery of the Product to Project Participants and continuing through the term of this Agreement, Project Participants shall pay CCP the amounts of Monthly Costs set forth in the Billing Statements submitted by CCP to Project Participants in accordance with the provisions of Section 9, whether or not the Project or any part thereof has been completed, is functioning, producing, operating or operable or its output or the provision of Facility products are suspended, interrupted, interfered with, reduced or curtailed or terminated in whole or in part, and such payments shall not be subject to reduction whether by offset or otherwise and shall not be conditional upon the performance or nonperformance by any party of any agreement for any cause whatsoever, provided that the obligation of Project Participants to pay amounts associated with the Monthly Product Payment shall be limited to the amount of Monthly Product Payment charged by the Project Developer to CCP and paid by CCP to the Project Developer.

Page 487 of 1037 ends

31 10.2. Authorizations. Each Project Participant hereby represents and warrants that no order, approval, consent, or authorization of any governmental or public agency, authority, or person, is required on the part of such Project Participant for the execution and delivery by the Project Participant, or the performance by the Project Participant of its obligations under this Agreement except for such as have been obtained.

10.3. Conflicts. Each Project Participant represents and warrants to CCP as of the Effective Date that, to the Project Participant s knowledge, the execution and delivery of this Agreement by the Project Participants and t
not constitute a default under any agreement or instrument to which it is a party, or any order, judgment, decree or ruling of any court that is binding on the Project Participant, or a violation of any applicable law of any governmental authority, which default or violation would have a material adverse effect on the financial condition of the Project Participant.

10.4. Litigation. Each Project Participant represents and warrants to CCP that, as of the Effective Date, to the Project Participants knowledge, except as disclosed, there are no actions, suits or proceedings pending against the Project Participant (service of process on the Project Participant having been made) in any court that questions the validity of the authorization, execution or delivery by the Project Participant of this Agreement, or the enforceability on the Project Participant of this Agreement.

10.5. San José Clean Energy.
(a) The City of San José is a municipal corporation and is precluded under the California State Constitution and applicable law from entering into obligations that financially bind future governing bodies without an appropriation for such obligation, and, therefore, nothing in the Agreement shall constitute an obligation of future legislative bodies of the City of San José to appropriate funds for purposes of the Agreement; provided, however, that the City of San José has created and set aside a designated fund (being the San Jose Energy Operating Fund established pursuant to City of San Jose Municipal Code, Title 4, Part 63, Section 4.80.4050 et. seq.) ( Designated Fund this Agreement.
(b) Limited Obligations. The City of San José this
Agreement are special limited obligations of San José Clean Energy payable solely from the Designated Fund and are not a charge upon the revenues or general fund of the City of San José or upon any non- San José Clean Energy moneys or other property of the Community Energy Department or the City of San José.

10.6. Clean Power San Francisco. With regard to Clean Power San Francisco only, (1) obligations under this Agreement are special limited obligations of Clean Power San Francisco payable solely from the revenues of Clean Power San Francisco, and shall not be a charge upon the revenues or general fund of the San Francisco Public Utilities Commission or the City and County of San Francisco or upon any non-Clean Power San Francisco moneys or other property of the San Francisco Public Utilities Commission or the City and County of San Francisco, (2) cannot exceed the amount certified by the San Francisco City Controller for the purpose and period stated in such certification, and (3) absent an authorized emergency per the San Francisco City Charter or Code, no San Francisco City representative is authorized to offer or promise, nor is San

Page 488 of 1037 ends

32 Francisco required to honor, any offered or promised payments under this Agreement for work beyond the agreed upon scope or in excess of the certified maximum amount without the San Francisco City Controller having first certified the additional promised amount.

ARTICLE 11

PROJECT SPECIFIC MATTERS AND PROJECT PARTICIPANTS RIGHTS AND OBLIGATIONS.

11.1. CCP Rights and Obligations under the PPA. Notwithstanding anything to the contrary contained in this Agreement: (i) the obligation of CCP to cause the delivery of the Project s of the Product during the Delivery Term of this Agreement is limited to the Product which CCP receives from the Facility (or the Project Developer, as applicable); (ii) the obligation of CCP to pay any amount to Project Participants hereunder or to give credits against amounts due from Project Participants hereunder is limited to amounts CCP receives in connection with the transaction to which the payment or credit relates (or is otherwise available to CCP in connection with this Agreement for which such payment or credit relates); (iii) any purchase costs, operating costs, energy costs, capacity costs, Facility costs, environmental attribute costs, transmission costs, tax costs, insurance costs, indemnifications, other costs or other charges for which CCP is responsible under the PPA shall be considered purchase costs, operating costs, energy costs, capacity costs, Facility costs, environmental attribute costs, transmission costs, tax costs, insurance costs, indemnifications, other costs or other charges incurred by CCP and payable by Project Participants as provided in this Agreement; (iv) CCP shall carry out its obligations and exercise its rights under the PPA in a commercially reasonable manner; (v) all remedies provided to CCP pursuant to the PPA or the Scheduling Coordinator Services Agreement shall be provided to Project Participants in accordance with Section 5.1(h); and (vi) any Force Majeure under the PPA or other event of force majeure affecting the delivery of Product pursuant to applicable provisions of the PPA shall be considered an event caused by Uncontrollable Forces affecting CCP with respect to the delivery of the Product hereunder and CCP forwarding to Project Participants notices and information from the Project Developer concerning an event of Force Majeure upon receipt thereof shall be sufficient to constitute a Notice that Uncontrollable Forces have occurred pursuant to Section 5.1 of this Agreement. Any net proceeds received by CCP from the sale of the Product by the Project Developer to any third-party as a result of a Force Majeure event or failure by CCP to accept delivery of Product pursuant to the PPA and any reimbursement received by CCP for purchase of Replacement RA shall be remitted by CCP to the Project Participants in accordance with their respective Entitlement Shares.

11.2. Obligations of CCP and Project Participants to Maximize the Economic and Compliance Value of the Project.
(a) Each Project Participant shall take all actions that are (i) reasonably necessary to maximize the economic and compliance value of the Project to the Project Participants, and (ii) only capable of being carried out by the Project Participants. Such actions include, but are not limited to, applying for and securing the import capability rights necessary to support the import of Capacity Attributes from the Project into the CAISO in an amount equal to at least its Entitlement Share of all of the import capability rights that are needed to utilize all of the Resource Adequacy Benefits from the Project.

Page 489 of 1037 ends

33 (b) CCP shall take any actions requested by a Project Participant to support the and any actions requested by a
Project Participant that are reasonably necessary to maximize the economic and compliance value of the Project to the Project Participants, to the extent that such actions by CCP are feasible and commercially reasonable.
(c) If any individual Project Participant fails to secure import capability rights or other similar rights in an amount equal to at least its Entitlement Share of all of the import capability rights that are needed to utilize all of the Resource Adequacy Benefits available from the Project, then any resulting reduced economic or compliance value of the Project shall not reduce or otherwise modify that Project payment obligations under Section 10.1. (d) CCP and the Project Participants agree to take such additional actions in order to help effectuate the transfer of any import capability rights or similar rights from a Defaulting Project Participant to any Non-Defaulting Project Participantsthat assumes any portion Section 12.8(b) or 12.8(c). Such actions include but are not limited to executing additional agreements among the Project Participants, amending this Agreement, and/or submitting necessary documents to CAISO and participating in any CAISO process related to the transfer of import capability rights.

ARTICLE 12
NONPERFORMANCE AND PAYMENT DEFAULT.

12.1. Nonperformance by Project Participants. If a Project Participant fails to perform any covenant, agreement, or obligation under this Agreement or shall cause CCP to be in default with respect to any undertaking entered into for the Project or to be in default under the PPA ( Defaulting Project Participant ), CCP may, in the event the performance of any such obligation remains unsatisfied after thirty (30)
Participant and a demand to so perform, take any action permitted by law to enforce its rights under this Agreement, including rights under
this Agreement including any rights to its Entitlement Share of the Product, and/or bring any suit, action or proceeding at law or in equity as may be necessary or appropriate to recover damages and/or enforce any covenant, agreement or obligation against such Project Participant with regard to its failure to so perform. Any Project Participant that is not the Defaulting Project Participant ( Non-Defaulting Project Participant ) may submit Notice directly to the CCP Board, if such Non-Defaulting Project Participant determines that CCP is or may not be fully taking appropriate .

The CCP Board shall consider such Notice and direct CCP to take appropriate action, if any.

12.2. Payment Default. If either of the following occurs, then such occurrence shall constitute a "Payment Default
(a) any Project Participant fails to deposit the Invoice Amount into the Project 5, and if such Participant
has not deposited the Invoice Amount plusthe Late Payment Charge

Page 490 of 1037 ends

34 Operating Account within ten (10) calendar days of the issuance of the Late Payment Notice to such Project Participant by CCP; or
(b) any Project Participant files a petition for Bankruptcy or has a petition for Bankruptcy filed against it, and such Project Participant has not shown that it is able to comply with its obligations under this Agreement to the reasonable satisfaction of Project Developer within sixty (60) days of such Bankruptcy filing, in which case a Payment Default shall occur upon the date that CCP receives a notice regarding such determination from Project Developer.

12.3. Payment Default Notice. Upon the occurrence of a Payment Default, CCP shall issue a Notice of Payment Default to the Project Participant notifying such Project Participant that as a result of a Payment Default, it is in default under this Agreement and has assumed the status of a Defaulting Project Participant and that such Defaulting Revenue Rights have been suspended and that such Defaulting
subject to termination and disposal in accordance with Sections 12.6 and 12.8 of this Agreement.

CCP shall provide a copy of such Notice of Default to all other Project Participants within five (5) calendar days after the issuance of the written Notice of Payment Default by CCP to the Defaulting Project Participant.

12.4. Cured Payment Default. If after a Payment Default, the Defaulting Project Participant cures such Payment Default within forty-five (45) calendar days after the issuance of the Late Payment Notice by CCP, Project Revenue Rights
shall be reinstated and its Project Rights shall not be subject to termination and disposal as provided for in Sections 12.6 and 12.8. In order to cure a Payment Default occurring under Section 12.2(a), the Defaulting Project Participant must deposit the full amount of any unpaid Invoice Amounts and any associated Late Payment Penalties into its Operating Account. In order to cure a Payment Default occurring under Section 12.2(b), the Bankruptcy proceeding against the Defaulting Project Participant must be dismissed or Project Developer must issue a Notice to CCP stating that Project Developer has determined that the Defaulting Project Participant has demonstrated that it is able to comply with its obligations under the Agreement.

12.5. Suspension of Project Revenue Rights and Treatment of Capacity Attributes and Environmental Attributes.
(i) Upon the occurrence of a Payment Default, the Defaulting Project Participant Project Revenue Rights shall be suspended until such time as such Defaulting Project Participant cures the Payment Default pursuant to the requirements of Section 12.4. Any revenue associated with the sale of Facility Energy, Capacity Attributes, Ancillary Services, or Environmental Attributes associated with the Facility shall be deposited by CCP into the Step-Up Reserve Account, as specified in Section 12.7.
(ii) For any Month where the funds remaining in a Defaulting Project entire Invoice Amount, CCP shall
withdraw and
shall cause the delivery of of the Product,
including Capacity Attributes and Environmental Attributes, associated with the Facility or otherwise provided for pursuant to the PPA. For any Month where the funds remaining in a

Page 491 of 1037 ends

35 essary to pay the
entire Invoice Amount, CCP shall withdraw all remaining funds from the Defaulting Project y possible, ,
CCP shall cause the delivery of a quantity of Capacity Attributes and Environmental Attributes proportionate to the portion of the Invoice Amount that the remaining funds were sufficient to pay for. For any Month where the Defaulting Project Participant Operating Account has no funds remaining, the Defaulting Project Participant shall have no right to any such Capacity Attributes or Environmental Attributes associated with the Facility or otherwise provided for under the PPA.

12.6. Termination and Disposal of . If a Defaulting
Project Participant has not cured a Payment Default within forty-five (45) calendar days after the payment deadline specified in Section 9.5 Payment Default Termination Deadline"), then all Project Rights and Obligations pursuant to this Agreement shall be terminated and disposed in accordance with Sections 12.6 and 12.8 of this Agreement; provided, however, that the Defaulting Project Participant shall be liable for all outstanding payment obligations accrued prior to the Payment Default Termination Deadline and shall remain subject to all rights, obligations, and liabilities of this Agreement, including but not limited to any liabilities for Damage Payment or Termination Payment, as applicable, and any other damage payments or reimbursement amounts under the PPA. CCP shall provide to the Defaulting Project Participant a separate monthly invoice of any such payment obligations of such Defaulting Project Participant.

CCP shall immediately notify the other Project Participants of such termination of the Defaulting and Obligations.

12.7. Step-Up Invoices.
(a) Upon the occurrence of a Payment Default, CCP shall, concurrently with the Late Payment Notice issued pursuant to Section 9.7(a), issue a Step-Up Invoice to each Non-Defaulting Project Participant that specifies such Non-Defaulting Project Participants pro rata payment obligation, calculated based on the Entitlement Share of such Non-Defaulting Project Participant, of the amount of the Payment Default for the Defaulting Project Participant Step-Up Invoice Amount ; provided, however, that a Non- -Up Invoice Amount shall not exceed twenty-five percent (25%) of such Non-Defaulting Project (i) Each Non-Defaulting Project Participant shall deposit the Step-Up Invoice Amount into such Non-Defaulting the later of
the twentieth (20th) calendar day of the following Month or thirty (30) days after the date on which CCP issues the Step-Up Invoice to the other Project Participants. No sooner than five (5) calendar days after CCP issues the Step-Up Invoice, CCP may withdraw the amount of the Step-Up Invoice and deposit such funds in a separate account
Step-Up Reserve Account be accessible only by CCP, and which CCP may in its sole discretion draw upon in order to ensure that CCP can meet the payment obligations of the PPA. CCP
Account before withdrawing funds from the Step-Up Reserve Account.

Step-Up Invoice Amount Cap ).

Page 492 of 1037 ends

36 (ii) Application of Moneys Received from a Defaulting Project Participant. If a Defaulting Project Participant cures a Payment Default on or before the Payment Default Termination Deadline, any funds remaining in the Step-Up Reserve Account shall be deposited into the Operating Accounts of the other Project Participants on a pro rata share, based on the Entitlement Share of such other Project Participant. If a Defaulting Project Participant fails to cure a Payment Default Obligations
are terminated and disposed of in accordance with Section 12.8, any funds remaining in the Step-Up Reserve Account shall be deposited into the Operating Accounts of the Non-Defaulting Project Participants on a pro rata share, based on the Entitlement Share, subject to the Step-Up Invoice Amount Cap, of such other Project Participant. If any Non-Defaulting Project Participant has not deposited the full amount of its share of the Step-Up Invoice Amount into its Operating Account by the deadline specified in Section 12.7(a)(i), then such occurrence shall be a Late Payment as specified in Section 9.7(a) and is subject to a Late Payment Charge pursuant to Section 9.7(b), and any such Non-Defaulting Project Participant shall not be entitled to its share of any moneys received from the Defaulting Project Participant or any funds remaining in the Step-Up Reserve Account in accordance with this Section 12.7(a)(ii) until such Non-Defaulting Project Participant has deposited the full amount of its Step-Up Invoice Amount and the Late Payment Charge into its Operating Account.

12.8. Step-Up Allocation of roject Rights. In the event that a Rights are terminated pursuant to Section 12.6, then such Participants ( Step-Up Allocation ) pursuant to the process set forth in this Section 12.8. (a) Step-Up Allocation Cap. If a D Entitlement
Share is allocated to the Non-Defaulting Project Participants pursuant to this Section 12.8, no individual Non-Defaulting Project Participant shall be obligated to assume an allocation that exceeds that Project Participant Step-Up Allocation Cap set forth in Column E of the Table in Exhibit B of this Agreement. Each Non-Defaulting initial Step-Up Allocation Cap shall be equal to the Non-Defaulting Project Participant Entitlement Share as of the Effective Date and set forth in Column B of the Table in Exhibit B of this Agreement, multiplied by one hundred and twenty-five percent (125%). If a Project Participant modifies its Entitlement Share -Up Allocation Cap
ursuant to Section 4.2
multiplied by one hundred and twenty-five percent (125%). Upon a modification of a Project the CCP Manager shall cause the Step-Up
Allocation Cap specified in Column E of the Table in Exhibit B of this Agreement to be modified Entitlement Share is increased pursuant to Section 12.8(b) or (c) Step-Up Allocation Cap shall not be modified.

Entitlement Share shall be allocated to each Non-Defaulting Project Participant based on such Non-Defaulting Project Participants pro rata share, calculated based on its Entitlement Share of the entire project minus the Entitlement Share of the Defaulting Project Participant, unless such allocation would cause any individual Non-Defaulting Project Participant to exceed its Step-Up (b) Step-Up Allocation Share.

Page 493 of 1037 ends

37 Allocation Cap, in which case Section 12.8(c) shall apply. Upon allocation of a defaulting Project Entitlement Share pursuant to this Section 12.8(b), the CCP Managershall cause each Exhibit B
to be modified in accordance with this Section 12.8.
(c) Voluntary Allocation of Project Rights in Excess of the Step-Up Allocation Caps. If Entitlement Share pursuant to Section

12.8(b) would cause any Non-Defaulting Project Participant to exceed its Step-Up Allocation Cap, then no allocation shall occur pursuant to Section 12.8(b). In such case, the CCP Manager shall oversee the offering of the total amount of the Defaulting Project Entitlement Share to the Non-Defaulting Project Participants on a voluntary basis.

The initial offering shall be to each Non-Defaulting Project Participant on a pro rata share, based on such Non-Defaulting
Entitlement Share. If any portion
Entitlement Share remains unclaimed after the initial
offering, then the remaining portion shall be offered to any Non-Defaulting Project Participant that accepted its full share of the Defaulting Project Entitlement Share in the initial offering on a pro rata share, based on such Non-Defaulting as a percentage of the total Entitlement Shares of all Project Participants that are participating in the subsequent round of offerings. The CCP Manager shall conduct subsequent offering rounds Entitlement Share is accepted
by one or more of the Non-Defaulting Project Participants or some portion of the Defaulting Entitlement Share remains, but all Non-Defaulting Project Participants have rejected such remaining amount.
(d) Step-Up Allocation Damage Payment. A Defaulting Project Participant shall owe to each Non-Defaulting Project Participant that assumes any portion of the Defaulting Entitlement Share pursuant to the process set forth in Section 12.8(b) or Step-Up Allocation Damage Payment Costs and Losses, on the one hand, netted against its Gains, on the other. If the Non-Defaulting exceed its Gains, then the Step-Up Allocation Damage Payment shall be an amount owing to such Non-Defaulting Project Participant. If the Non-Defaulting Project Pa Costs and Losses, then the Step-Up Allocation Damage Payment shall be zero dollars ($0). A Defaulting Project Participant shall not be entitled to any Step-Up Allocation Damage Payment or any other damages otherwise authorized under this Agreement from any other Project Participant.

The Step-Up Allocation Damage Payment does not include consequential, incidental, punitive, exemplary, or indirect or business interruption damages. Each Non-Defaulting Project Participant that assum
process set forth in Section 12.8(b) or 12.8(c) shall calculate, in a commercially reasonable manner, the Step-Up Allocation Damage Payment for the Defaulting Project Share assumed by the Non-Defaulting Project Participant as of the effective date of such Step-Up Allocation. Third parties supplying information for purposes of the calculation of Gains or Losses may include, without limitation, dealers in the relevant markets, end-users of the relevant product, information vendors and other sources of market information. If the Defaulting Project Participant disputes the Non-Defaulting -Up Allocation Damage
Payment, in whole or in part, the Defaulting Project Participant shall, within five (5) Business Days of receipt of the Non-Defaulting calculation of the Step-Up Allocation

Page 494 of 1037 ends

38 Damage Payment, provide to the Non-Defaulting Project Participant a detailed written explanation of the basis for such dispute. Disputes regarding the Step-Up Allocation Damage Payment shall be determined in accordance with Article 16. Each Party agrees and acknowledges that (i) the actual damages that the other Project Participant would incur in connection with a Step-Up Allocation would be difficult or impossible to predict with certainty, (ii) the Step-Up Allocation Damage Payment described in this Section 12.8(d) is a reasonable and appropriate approximation of such damages, and (iii) the Step-Up Allocation Damage Payment described in this Section

12.8(d) is the exclusive remedy of a Project Participant in connection with a Step-Up Allocation pursuant to the process set forth in Sections 12.8(b) or 12.8(c) against a Defaulting Project Participant but shall not otherwise act to limit any of the Non-Defaulting rights or remedies under this Agreement.
(e) Import Capacity Rights.
are terminated pursuant to Section 12.6, then such Defaulting Project Participant shall transfer all import capacity rights and other similar rights that are associated with the Project and that are held by such Defaulting Project Participant to the Non-Defaulting Project Participants that assume any in Section 12.8(b) or 12.8(c). The Defaulting Project Participant shall take all actions necessary to effectuate the transfer of such rights to the Non-Defaulting Project Participants. (f) Remarketing of Entitlement
Share. If after the process set forth in Section 12.8(c), some portion of the Defaulting Project Entitlement Share remains unclaimed, the CCP Manager, in their discretion or as directed by the Non-Defaulting Project Participants, may take any action to generate revenue from such unclaimed Entitlement Share der the PPA. For
avoidance of doubt, the CCP Manager shall not be limited by the requirements of Section 4.2 or

5.1(j) of this Agreement in remarketing or generating revenue base on the unclaimed share.

12.9. Elimination or Reduction of Payment Obligations. Notwithstanding anything to the contrary in this Agreement, u
pursuant to Section 12.6 and the disposal of
and Obligations pursuant to Section 12.8
payments under this Agreement (notwithstanding anything to the contrary herein) shall not be eliminated or reduced; provided, however, such payment obligations for the Defaulting Project Participant may be eliminated or reduced to the extent permitted by law, through an amendment to this Agreement, which shall be subject to the consent and approval of all Parties to this Agreement.

ARTICLE 13

LIABILITY

13.1. Several. No Project Participant shall be liable
under this Agreement for the obligations of any other Project Participant or for the obligations of CCP incurred on behalf of other Project Participants. Each Project Participant shall be solely responsible and liable for performance of its obligations under this Agreement, except as otherwise provided for herein. The obligation of Project Participants to make payments under this

Page 495 of 1037 ends

39 Agreement is a several obligation and not a joint obligation with those of the other Project Participants.

13.2. No Liability of CCP or Project Participants, Their Directors, Officers, Etc.; CCP, Liable. Except as provided for under Section 13.5 herein, the Parties agree that neither CCP, Project Participants, nor any of their past, present or future directors, officers, employees, board Released Parties
other of the Released Parties for any and all claims, demands, liabilities, obligations, losses, damages (whether direct, indirect or consequential), penalties, actions, loss of profits, judgments, orders, suits, costs, expe
or nature whatsoever in law, equity or otherwise (including, without limitation, death, bodily injury or personal injury to any person or damage or destruction to any property of Project Participants, CCP, or third persons) suffered by any Released Party as a result of the action or inaction or performance or non-performance by the Project Developer under the PPA. Except as provided for under Section 13.5 herein, each Party shall release each of the other Released Parties from any claim or liability that such Party may have cause to assert as a result of any actions or inactions or performance or non-performance by any of the other Released Parties under this Agreement (excluding gross negligence and willful misconduct, which, unless otherwise agreed to by the Parties, are both to be determined and established by a court of competent jurisdiction in a final, non-appealable order). Notwithstanding the foregoing, no such action or inaction or performance or non-performance by any of the Released Parties shall relieve CCP or any Project Participants from their respective obligations under this Agreement, including, without limitation, the Project ke payments required under Section 9.5
obligation to make payments under Section 8.2 of the PPA. The provisions of this Section 13.2 shall not be construed so as to relieve the CCP or the Project Developer from any obligation or liability under this Agreement or the PPA.

13.3. Extent of Exculpation; Enforcement of Rights. The exculpation provision set forth in Section 13.2 hereof shall apply to all types of claims or actions including, but not limited to, claims or actions based on contract or tort. Notwithstanding the foregoing, any Party may protect and enforce its rights under this Agreement by a suit or suits in equity for specific performance of any obligations or duty of any other Party, and each Party shall at all times retain the right to recover, by appropriate legal proceedings, any amount determined to have been an overpayment, underpayment or other monetary damages owed by the other Party in accordance with the terms of this Agreement.

13.4. No General Liability of CCP. The undertakings under this Agreement by CCP shall not constitute a debt or indebtedness of CCP within the meaning of any provision or limitation of the Constitution or statutes of the State of California, and shall not constitute or give rise to a charge against its general credit.

13.5. Indemnification. Each Party Indemnifying Party shall indemnify, defend, protect, hold harmless, and release the other Parties, their directors, board members, officers, employees, agents, attorneys and advisors, past, present or future, from and against any and all claims, demands, liabilities, obligations, losses, damages (whether direct, indirect or consequential), penalties, actions, loss of profits, judgments, orders, suits, costs, expenses

Page 496 of 1037 ends

40 or disbursements of any kind or nature whatsoever in law, equity or otherwise, which include, without limitation, death, bodily injury, or personal injury to any person or damage or destruction to any property of Project Participants, CCP, or third persons, that may be imposed on, incurred by or asserted against any Party arising by manner of any breach of this Agreement by the Indemnifying Party, or the negligent acts, errors, omissions or willful misconduct incident to the performance of this Agreement on the part of any such Indemnifying Party or any Indemnifying directors, board members, officers, employees, agents and advisors, past, present or future.

ARTICLE 14

NOTICES

14.1. Addresses for the Delivery of Notices. Any Notice required, permitted, or contemplated hereunder shall be in writing, shall be addressed to the Party to be notified at the address set forth in Exhibit A or at such other address or addresses as a Party may designate for itself from time to time by Notice hereunder.

14.2. Acceptable Means of Delivering Notice. Each Notice required, permitted, or contemplated hereunder shall be deemed to have been validly served, given or delivered as follows:
(a) if sent by United States mail with proper first class postage prepaid, five (5) Business Days following the date of the postmark on the envelope in which such Notice was deposited in the United States mail; (b) ifsent by a regularly scheduled overnight delivery carrier with delivery fees either prepaid or an arrangement with such carrier made for the payment of such fees, the next Business Day after the same is delivered by the sending Party to such carrier; (c) if sent by electronic communication (including electronic mail or other electronic means) at the time indicated by the time stamp upon delivery and, if after 5:00 pm, on the next Business Day; or (d) if delivered in person, upon receipt by the receiving Party. Notwithstanding the foregoing, Notices of outages or other scheduling or dispatch information or requests, may be sent by electronic communication and shall be considered delivered upon successful completion of such transmission.

ARTICLE 15

ASSIGNMENT

15.1. General Prohibition on Assignments. No Party may assign this Agreement, or its rights or obligations under this Agreement, without the prior written consent of all other Parties, ARTICLE 16

GOVERNING LAW AND DISPUTE RESOLUTION

16.1. Governing Law. This Agreement and the rights and duties of the Parties hereunder shall be governed by and construed, enforced, and performed in accordance with the laws of the state of California, without regard to principles of conflicts of Law. To the extent enforceable at such time, each Party waives its respective right to any jury trial with respect to any litigation arising under or in connection with this Agreement. The Parties agree that any suit, action, or other legal proceeding by or against any Party with respect to or arising out of this Agreement shall be

Page 497 of 1037 ends

41 brought in the federal or state courts located in the State of California in a location to be mutually chosen by all Parties, or in the absence of mutual agreement, the County of San Francisco.

16.2. Dispute Resolution. In the event of any dispute arising under this Agreement, within ten (10) days following the receipt of a Notice from either Party identifying such dispute, the Parties shall meet, negotiate, and attempt, in good faith, to resolve the dispute quickly and informally without significant legal costs. If the Parties are unable to resolve a dispute arising hereunder within thirty (30) days after Notice of the dispute, the Parties may pursue all remedies available to them at Law or in equity.

ARTICLE 17

MISCELLANEOUS

17.1. Entire Agreement; Integration; Exhibits. This Agreement, together with the Exhibits attached hereto constitutes the entire agreement and understanding by and among the Parties with respect to the subject matter hereof and supersedes all prior agreements relating to the subject matter hereof, which are of no further force or effect. The Exhibits attached hereto are integral parts hereof and are made a part of this Agreement by reference. The headings used herein are for convenience and reference purposes only. This Agreement shall be considered for all purposes as prepared through the joint efforts of the Parties and shall not be construed against one Party or the other as a result of the preparation, substitution, submission, or other event of negotiation, drafting or execution hereof.

17.2. Amendments. This Agreement may only be amended, modified, or supplemented by an instrument in writing executed by duly authorized representatives of all Parties; provided, this Agreement may not be amended by electronic mail communications. Any revisions to the Entitlement Share specified in Exhibit B pursuant to Section 4.2. or Section 12.8 shall be considered an element of the administration of this Agreement and shall not require the consent of the Parties hereto.

17.3. No Waiver. Waiver by a Party of any default by the other Party shall not be construed as a waiver of any other default.

17.4. Severability. In the event that any provision of this Agreement is unenforceable or held to be unenforceable, the Parties agree that all other provisions of this Agreement have force and effect and shall not be affected thereby. The Parties shall, however, use their best endeavors to agree on the replacement of the void, illegal or unenforceable provision(s) with legally acceptable clauses which correspond as closely as possible to the sense and purpose of the affected provision and this Agreement as a whole.

17.5. Counterparts. This Agreement may be executed in one or more counterparts, all of which taken together shall constitute one and the same instrument and each of which shall be deemed an original.

17.6. Electronic Delivery. This Agreement may be duly executed and delivered by a Party by electronic format (including portable document format (.pdf)). Delivery of an executed counterpart in .pdf electronic version shall be binding as if delivered in the original. The words

Page 498 of 1037 ends

42 include electronic signatures or electronic records, each of which shall be of the same legal effect, validity, or enforceability as a manually executed signature or the use of a paper-based record keeping system, as the case may be, to the extent and as provided for in any applicable law.

17.7. Binding Effect. This Agreement shall inure to the benefit of and be binding upon the Parties and their respective successors and permitted assigns.

17.8. Forward Contract. The Parties acknowledge and agree that this Agreement d that the
Parties . Each
Party further agrees that, for all purposes of this Agreement, each Party waives and agrees not to assert the applicability of the provisions of 11 U.S.C. § 366 in any Bankruptcy proceeding wherein such Party is a debtor. In any such proceeding, each Party further waives the right to assert that the other Party is a provider of last resort to the extent such term relates to 11 U.S.C. §366 or another provision of 11 U.S.C. § 101-1532.

17.9. City of San Francisco Standard Provisions.
(a) False Claims. Pursuant to San Francisco Administrative Code § 21.35, any Party to this Agreement who submits a false claim shall be liable to the City and County of San Francisco for the statutory penalties set forth in that section. A Party will be deemed to have submitted a false claim to the City and County of San Francisco if the Party: (a) knowingly presents or causes to be presented to an officer or employee of the City and County of San Francisco a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be made or used a false record or statement to get a false claim paid or approved by the City and County of San Francisco; (c) conspires to defraud the City and County of San Francisco by getting a false claim allowed or paid by the City and County of San Francisco; (d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to pay or transmit money or property to the City and County of San Francisco; or (e) is a beneficiary of an inadvertent submission of a false claim to the City and County of San Francisco, subsequently discovers the falsity of the claim, and fails to disclose the false claim to the City and County of San Francisco within a reasonable time after discovery of the false claim. (b) Political Activity. In performing its responsibilities under this Agreement, CCP shall comply with San Francisco Administrative Code Chapter 12G, which prohibits funds appropriated by the City and County of San Francisco for this Agreement from being expended to participate in, support, or attempt to influence any political campaign for a candidate or for a ballot measure.
(c) Non-discrimination Requirements.
(i) Non-discrimination in Contracts. CCP shall comply with the provisions of Chapters 12B and 12C of the San Francisco Administrative Code. CCP shall incorporate by reference in all subcontracts the provisions of Sections12B.2(a), 12B.2(c)-(k), and 12C.3 of the San Francisco Administrative Code and shall require all subcontractors to comply with such provisions. CCP is subject to the enforcement and penalty provisions in Chapters 12B and 12C.

Page 499 of 1037 ends

43 (ii) Non-discrimination in the Provision of Employee Benefits. San Francisco Administrative Code 12B.2. CCP does not as of the date of this Agreement, and will not during the term of this Agreement, in any of its operations in San Francisco, on real property owned by San Francisco, or where work is being performed for the City elsewhere in the United States, discriminate in the provision of employee benefits between employees with domestic partners and employees with spouses and/or between the domestic partners and spouses of such employees, subject to the conditionsset forth in San Francisco Administrative Code Section 12B.2. (d) Consideration of Criminal History in Hiring and Employment Decisions. ity
Contractor/Subcontractor Consideration of Criminal History in Hiring and Employment implementing regulations, as may be amended from time to time. The requirements of Chapter performance of this Agreement, shall apply only to applicants and employees who would be or are performing work in furtherance of this Agreement, and shall apply when the physical location of the employment or prospective employment of an individual is wholly or substantially within the City. Chapter 12T shall not apply when the application in a particular context would conflict with federal or state law or with a requirement of a government agency implementing federal or state law. MacBride Principles Northern Ireland. Pursuant to San Francisco Administrative Code § 12F.5, the City and County of San Francisco urges companies doing business in Northern Ireland to move towards resolving employment inequities, and encourages such companies to abide by the MacBride Principles. The City and County of San Francisco urges San Francisco companies to do business with corporations that abide by the MacBride principles. (e) MacBride Principles Northern Ireland. Pursuant to San Francisco Administrative Code § 12F.5, the City and County of San Francisco urges companies doing business in Northern Ireland to move towards resolving employment inequities, and encourages such companies to abide by the MacBride Principles. The City and County of San Francisco urges San Francisco companies to do business with corporations that abide by the MacBride Principles. (f) Tropical Hardwood and Virgin Redwood Ban. The City and County of San Francisco urges contractors not to import, purchase, obtain, or use for any purpose, any tropical hardwood, tropical hardwood product, virgin redwood or virgin redwood product. If this order is for wood products or a service involving wood products: (a) Chapter 8 of the Environment Code is incorporated herein and by reference made a part hereof as though fully set forth. (b) Except as expressly permitted by the application of Sections 802(B), 803(B), and 804(B) of the Environment Code, CCP shall not provide any items to the City in performance of this Agreement which are tropical hardwoods, tropical hardwood products, virgin redwood or virgin redwood products. (c) Failure of CCP to comply with any of the requirements of Chapter 8 of the Environment Code shall be deemed a material breach of contract.

17.10. City of San José Standard Provisions.
(a) Nondiscrimination/Non-Preference. The Parties shall not, and shall not cause or allow its subcontractors to, discriminate against or grant preferential treatment to any person on the basis of race, sex, color, age, religion, sexual orientation, actual or perceived gender

Page 500 of 1037 ends

44 identity, disability, ethnicity or national origin. This prohibition applies to recruiting, hiring, demotion, layoff, termination, compensation, fringe benefits, advancement, training, apprenticeship and other terms, conditions, or privileges of employment, subcontracting and purchasing. The Parties will inform all subcontractors of these obligations. This prohibition is subject to the following conditions: (i) the prohibition is not intended to preclude Parties from providing a reasonable accommodation to a person with a disability; (ii) the City of San José Compliance Officer may require the Parties to file, and cause any Party s subcontractor to file, reports demonstrating compliance with this section. Any such reports shall be filed in the form pliance Officer designates. They shall contain such
compliance with this provision.
(b) Conflict of Interest. The Parties represent that they are familiar with the local and state conflict of interest laws, and agrees to comply with those laws in performing this Agreement. The Parties certify that, as of the Effective Date, are unaware of any facts constituting a conflict of interest or creating an appearance of a conflict of interest. The Parties shall avoid all conflicts of interest or appearances of conflicts of interest in performing this Agreement. The Parties have the obligation of determining if the manner in which it performs any part of this Agreement results in a conflict of interest or an appearance of a conflict of interest, and a Party shall immediately notify the City of San José in writing if it becomes aware of any facts giving rise to a conflict of interest or the appearance of a conflict of interest. violation of this Section 17.10(b) is a material breach.
(c) Environmentally Preferable Procurement Policy. Parties shall perform its obligations under this Agreement in conformance with San José City Council Policy 1-19, entitled Council Policy 4-
may be amended from time to time. The Parties acknowledge and agree that in no event shall a breach of this Section 17.10(c) be a material breach of this Agreement or otherwise give rise to an Event of Default or entitle the City of San José to terminate this Agreement. (d) Gifts Prohibited. The Parties represent that they are familiar with Chapter

12.08 of the San José Municipal Code, which generally prohibits a City of San José officer or designated employee from accepting any gift. The Parties shall not offer any City of San José officer or designated employee any gift prohibited by Chapter 12.08. violation of this Section 17.10(d) is a material breach.
(e) Disqualification of Former Employees. The Parties represent that they are familiar with Chapter 12.10 of the San José Municipal Code, which generally prohibits a former City of San José officer and former designated employee from providing services to the City of San José connected with his/her former duties or official responsibilities. Parties shall not use either directly or indirectly any officer, employee or agent to perform any services if doing so would violate Chapter 12.10.

17.11. Further Assurances. Each of the Parties hereto agrees to provide such information, execute, and deliver any instruments and documents and to take such other actions as may be necessary or reasonably requested by the other Party which are not inconsistent with the provisions

Page 501 of 1037 ends

45 of this Agreement and which do not involve the assumptions of obligations other than those provided for in this Agreement, to give full effect to this Agreement and to carry out the intent of this Agreement.
[Signatures on following page]

Page 502 of 1037 ends

46 DocuSign Envelope ID: 7121F28C-4F7A-4142-A590-A44DE4212687 IN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed as of the Effective Date.

California Community Power
By:

Name: Tim Haines
Title: Interim General Manager
Approved as to form by Counsel
By:

Name: Brittany Iles
Title: General counsel
Central Coast Community Energy
By:

Name: Tom Habashi
Title: CEO
Approved as to form by Counsel
By:

Name: Brian Kimball
Title: General counsel
Clean Power San Francisco
By:

Name: Dennis Herrera
Title: General Manager
Approved as to form by Counsel
By:

Name: William sanders
Title: Deputy city Attorney

Page 503 of 1037 ends

47 Peninsula Clean Energy Authority
By:

Name:

Title:

Approved as to form by Counsel
By:

Name:

Title:

Redwood Coast Energy Authority
By:

Name:

Title:

Approved as to form by Counsel
By:

Name:

Title:

San José Clean Energy
By: Lori Mitchell Sep 28, 2022 Lori Mitchell (Sep 28, 2022 13:32 PDT) Name: Lori Mitchell
Title: Director, Community Energy Department
Approved as to form by Counsel
By: Sep 27, 2022
Name: Luisa Elkins
Title: Sr. Deputy City Attorney II
Silicon Valley Clean Energy Authority
By:

Name:

Title:

Approved as to form by Counsel
By:

Name:

Title:

Page 504 of 1037 ends

48 DocuSign Envelope ID: 7121F28C-4F7A-4142-A590-A44DE4212687 Sonoma Clean Power Authority Valley Clean Energy
By: By:

Name: Dave King Name: Mitch sears
Title: chair of Sonoma clean Power Title: Executive officer By: Approved as to form by Counsel
Name: Deb Fudge
Title: Vice chair By:

Name: Inder Khalsa
By:

Title: General counsel
Name: Geof Syphers
Title: CEO
By:

Name: Deb Emerson
Title: Managing Director
Approved as to form by Counsel
By:

Name: Joshua Nelson
Title: Special counsel

Page 505 of 1037 ends

Exhibit A - 1

EXHIBIT A

NOTICES
Party All Notices Invoices
California
Community Power
California Community Power
Tim Haines, Interim General
Manager
California Community Power
70 Garden Court, 3rd Floor
Monterey, CA 93940
[email protected]
Maher Accountancy
Michael Maher
[email protected]
415-526-3020
Central Coast
Community Energy
Central Coast Community Energy
Brian Kimball, General Counsel
Central Coast Community Energy
70 Garden Court, 3rd Floor
Monterey, CA 93940
[email protected]
Central Coast Community Energy
Accounts Payable
[email protected]
Clean Power San
Francisco
CleanPowerSF
Michael Hyams, Deputy AGM
CleanPowerSF
cc: Contract Administration
San Francisco Public Utilities
Commission
525 Golden Gate Ave, 7th Floor
San Francisco, CA 94102
[email protected]
[email protected]
CleanPowerSF
Power Invoices
Attn: Angie Lee
San Francisco Public Utilities
Commission
525 Golden Gate Ave, 7th Floor
San Francisco, CA 94102
[email protected]
[email protected]
Peninsula Clean
Energy Authority
Peninsula Clean Energy Authority
Jan Pepper, CEO
Peninsula Clean Energy
2075 Woodside Road
Redwood City, California 94061
[email protected]
[email protected]
Peninsula Clean Energy Authority
Attn: Chief Financial Officer
Peninsula Clean Energy
2075 Woodside Road
Redwood City, California 94061
[email protected]
[email protected]
650-260-0005

Page 506 of 1037 ends

Exhibit A - 2
Party All Notices Invoices
Redwood Coast
Energy Authority
Redwood Coast Energy Authority
Matthew Marshall, Executive
Director
Cc: Richard Engel, Director of Power
Resources
Redwood Coast Energy Authority
633 3rd Street
Eureka, CA 95501
[email protected]
[email protected]
Redwood Coast Energy Authority
Attn: Accounts Payable
633 3rd Street
Eureka, CA 95501
[email protected]
[email protected]
San José Clean
Energy
San José Clean Energy
Lori Mitchell, Director
cc: Luisa Elkins, Senior Deputy City
Attorney
San José Clean Energy
200 E. Santa Clara Street, 14th Floor
San José, CA 95113
[email protected]
[email protected]
Silicon Valley
Clean Energy
Authority
Silicon Valley Clean Energy
Authority
Girish Balachandran, CEO
Silicon Valley Clean Energy
Authority
333 W. El Camino Real, Suite 330
Sunnyvale, CA 94087
[email protected]
Silicon Valley Clean Energy
Authority
Attn: Power Supply Group
[email protected]
408-721-5301
Sonoma Clean
Power Authority
Sonoma Clean Power Authority
Geof Syphers, CEO
cc: Deb Emerson, Managing Director
of Power Procurement
Sonoma Clean Power Authority
P.O. Box 1030
Santa Rosa, CA 95402
[email protected]
[email protected]
Sonoma Clean Power Authority
[email protected]

Page 507 of 1037 ends

Exhibit A - 3
Party All Notices Invoices
Valley Clean
Energy
Valley Clean Energy
Mitch Sears, Executive Officer
Valley Clean Energy
604 2nd Street
Davis, CA 95616
[email protected]
Valley Clean Energy
[email protected]

Page 508 of 1037 ends

EXHIBIT B

SCHEDULE OF PROJECT PARTICIPANT ENTITLEMENT SHARES

AND STEP-UP ALLOCATION CAPS
Dated:

A B C D E
Project Participant
Entitlement Share
As of Effective Date
Entitlement Share
As Modified Pursuant to
Section 4.2
Entitlement Share
As Modified Pursuant to
Section 12.8(b) or 12.8(c)
Step-Up Allocation Cap
125% multiplied by Column B
or C as applicable
Central Coast Community Energy 18.6%
Clean Power San Francisco 14.5%
Peninsula Clean Energy Authority 17.8%
Redwood Coast Energy Authority 2.8%
San José Clean Energy 17.4%
Silicon Valley Clean Energy
Authority

14.0%
Sonoma Clean Power Authority 11.7%
Valley Clean Energy 3.2%
Total 100%
Instructions: If the CCP Manager
prepare an updated Exhibit B that shows the prior Entitlement Share (Column B or D) in strikeout and specifies the new Entitlement Share values Exhibit B - 1

Page 509 of 1037 ends

DocuSign Envelope ID: 7121F28C-4F7A-4142-A590-A44DE4212687 and the effective date of such modification in Column C. If the CCP Manager modifies one or more Project Participant's Entitlement Share pursuant to Section 12.8, the CCP Manager shall prepare an updated Exhibit B that shows the prior Entitlement Share (Column B or Column C) in strikeout and specifies the new Entitlement Share values and the effective date of such modification in Column D.

Exhibit B - 2

Page 510 of 1037 ends

Exhibit C - 1

EXHIBIT C

PROCEDURE FOR VOLUNTARY REDUCTION OF
(a) Offer to Other Project Participants. A Project Participant proposing to reduce its Entitlement Share of the Project shall provide Notice to all other Project Participants Entitlement
Share Reduction Amount Month for which the Project Participant Proposes that the change of Entitlement Share would become effective (such Notice referred to as the Entitlement Share Reduction Notice
(i) Upon receiving an Entitlement Share Reduction Notice from any Project Participant, the CCP Manager shall promptly do all of the following:
(A) Establish Entitlement Share Reduction Compensation
Amount. The CCP Manager shall secure at least one (1), but no more than three (3), valuations of the net present value of the Entitlement Share Reduction Amount over the remaining term of the PPA from one or more qualified firm(s) with the requisite experience to determine such valuation.

The valuation, or if more than one valuation is obtained, the average of all valuations received, Proposed Entitlement Share Reduction Compensation Amount Manager shall call a meeting of the Project Committee and present the Proposed Entitlement Share Reduction Compensation Amount to the Project Committee. The Project Committee shall by a Normal Vote either approve the Proposed Entitlement Share Reduction Compensation Amount or direct the CCP Manager to secure additional valuations. The Proposed Entitlement Share Entitlement
Share Reduction Compensation Amount The Project Participant proposing to reduce its Entitlement Share may modify the quantity of the Entitlement Share Reduction Amount associated with its proposal or withdraw its proposal at any time prior to the initiation of the process set forth in paragraph (a)(i)(B).
(B) Oversee the Offering of the Entitlement Share Reduction Amount to Other Project Participants. The CCP Manager shall facilitate the offering of the Entitlement Share Reduction Amount to the other Project Participants through multiple rounds of offerings.
a) The initial offering shall be to each Project
Participant may accept or reject the portion of the Entitlement Share Reduction Amount offered to the Project Participant through this process. If any portion of the Entitlement Share Reduction Amount remains after the initial offering, then the remaining portion shall be offered to any Project Participant that accepted the share of the Entitlement Share Reduction Amount offered in the initial offering on
of the total Entitlement Shares of all Project Participants that accepted the portion of the Entitlement Share Reduction Amount offered to them in the initial offering.

Page 511 of 1037 ends

Exhibit C - 2
b) The CCP Manager shall conduct subsequent offering
rounds until either the total Entitlement Share Reduction Amount is accepted by one or more of the other Project Participants orsome portion of the Entitlement Share Reduction Amount remains, but all Project Participants have rejected such amount. c) Any Project Participant accepting a share of the
offered Entitlement Share Reduction Amount shall either pay the offering Project Participant or be compensated by the offering Project Participant at the Entitlement Share Reduction Compensation Amount multiplied by the quantity of the portion being accepted. d) Before a transfer of all or a portion of any Project transfer must be submitted to and approved by the Project Committee through a Normal Vote. e) After acceptance and payment for such portion of the Entitlement Share Reduction Amount, and upon approval of such transfer by the Project Committee, the CCP Manager shall cause the Entitlement Share specified in Exhibit B to be modified accordingly, and such modification shall be considered an element of the administration of this Agreement and shall not require the consent of the Parties hereto. (C) Oversee the Offering of the Entitlement Share Reduction Amount to CCP Members that are not Project Participants. If there is any portion of the Entitlement Share Reduction Amount that remains unaccepted after the process specified in paragraph (a)(i)(B) is complete, then the Project Participant proposing to reduce its Entitlement Share may request that the CCP Manager offer the remaining portion of the Entitlement Share Reduction Amount to CCP Members that are not Project Participants. If any CCP Member wishes to accept any or all of the remaining portion of the Entitlement Share Reduction Amount, such action shall require the CCP Member to become a Project Participant through an amendment to this Agreement, which shall be subject to the consent and approval of all Parties to this Agreement and the CCP Member becoming a Project Participant. The compensation amount associated with the CCP Member accepting the remaining portion of the Entitlement Share Reduction Amount shall be negotiated between the CCP Member and the offering Project Participant. (D) Oversee the Offering of the Entitlement Share Reduction Amount to a Community Choice Aggregator that is not a CCP Member. If there is any portion of the Entitlement Share Reduction Amount that remains unaccepted after the process specified in both paragraphs (a)(i)(B) and (a)(k)(C) is complete, then the Project Participant proposing to reduce its Entitlement Share, may request that the CCP Manager offer the remaining portion of the Entitlement Share Reduction Amount to a community choice aggregator that is not a CCP Member. If any community choice aggregator wishes to accept any or all of the remaining portion of the Entitlement Share Reduction Amount, such action shall require the community choice aggregator to become a CCP Member, and subsequent to becoming a CCP Member, to become a Project Participant through an amendment to this Agreement that is subject to the consent and approval of all Parties to this Agreement and the community choice aggregator becoming a Project Participant. The compensation amount associated with the community choice aggregator accepting the remaining portion of the Entitlement Share Reduction Amount shall be negotiated between the community choice aggregator and the offering Project Participant.

Page 512 of 1037 ends

Exhibit D - 1

EXHIBIT D

PROJECT COMMITTEE OPERATIONS, MEETINGS, AND VOTING
(a) Chairperson of Project Committee. The chairperson of the Project Committee Chairperson Manager. The Chairperson shall be responsible for calling and presiding over meetings of the Project Committee in a manner and to the extent permitted by law.
(b) Conducting Meetings. Conducting of Project Committee meetings and actions taken by the Project Committee may be taken by vote given in an assembled meeting, by telephone, by video conferencing, or by any combination thereof, to the extent permitted by law. (c) Calling of Meetings.
(i) The Chairperson may call a meeting of the Project Committee at their discretion.
(ii) The Chairperson shall promptly call a meeting of the Project Committee at the request of any representative of a Project Participant. (d) Unanimous Votes. Certain actions, as designated in Section 6.4(c), require a unanimous affirmative vote by all Project Participants ( Unanimous Vote ). No such vote may be taken unless a representative from every Project Participant is present at the meeting of the Project Committee.
process specified in Exhibit C, such Project Participant shall not be required to be present or be entitled to vote in order for such vote to be a Unanimous Vote. (e) Normal Votes. All actions not designated asrequiring unanimous vote,shall proceed pursuant to the Normal Vote process set forth in this paragraph (e). (i) Quorum. No Normal Vote of the Project Committee shall be taken unless a representative is present for at least fifty percent (50%) of the total number of Project Participants, without regard to each Project Participant (ii) Initial Normal Vote. Unless a representative requests an Alternate Normal Vote, pursuant to paragraph (e)(iii), all actions requiring a Normal Vote, as specified in Section 6.4(b) or 6.4(d), shall require an affirmative vote of at least fifty-one percent (51%) of the total number of Project Participants, without regard to each Project Participant nt Share. (iii) Alternate Normal Vote. Any representative may request that any Normal Vote be taken on an Entitlement Share basis (referred to as an Alternate Normal Vote .

If a representative requests an Alternate Normal Vote, then the following vote requirements shall apply:

Page 513 of 1037 ends

Exhibit D - 2
(A) If any individual Project Participant has an Entitlement Share exceeding fifty percent (50%), then all actions for which an Alternate Normal Vote is taken shall require that the Project Participant with an Entitlement Share exceeding fifty percent (50%) plus any other Project Participant vote in the affirmative. (B) If no individual Project Participant has an Entitlement Share exceeding fifty percent (50%), then all actions for which an Alternate Normal Vote is taken shall require an affirmative vote of Project Participants having Entitlement Shares aggregating at least fifty-one percent (51%) of the total Entitlement Shares.

Page 514 of 1037 ends

OME - CC Power Project Participation Share Ag
reement_Executed_sjce
Final Audit Report 2022-09-28
"OME - CC Power Project Participation Share Agreement_Execu ted_sjce" History
Document created by Monica Gorham ([email protected]) 2022-09-27 - 7:11:57 PM GMT
Document emailed to Luisa Elkins ([email protected]) for signature 2022-09-27 - 7:14:19 PM GMT
Email viewed by Luisa Elkins ([email protected]) 2022-09-27 - 7:19:59 PM GMT
Document e-signed by Luisa Elkins ([email protected]) Signature Date: 2022-09-27 - 7:21:41 PM GMT - Time Source: server Document emailed to [email protected] for signature 2022-09-27 - 7:21:43 PM GMT
Email viewed by [email protected]
2022-09-28 - 8:32:13 PM GMT
Signer [email protected] entered name at signing as Lori Mitchell 2022-09-28 - 8:32:41 PM GMT
Document e-signed by Lori Mitchell ([email protected]) Signature Date: 2022-09-28 - 8:32:43 PM GMT - Time Source: server Agreement completed.
2022-09-28 - 8:32:43 PM GMT
Created:

By:

Status:
2022-09-27
Monica Gorham ([email protected])
Signed
Transaction ID: CBJCHBCAABAALdoNovM00GfDqbPOgC_jhIelBEvfXwy1

Page 515 of 1037 ends

1 84109.00001\44914801.1
AMENDMENT NO. 1

TO RENEWABLE POWER PURCHASE AGREEMENT
This Amendment No. 1 (the “First Amendment”) to the Agreement (as defined below), is dated as of [_______] [XX], 2026 (the “First Amendment Effective Date”), between California Community Power, a California joint powers authority (“Buyer”), and Fish Lake Geothermal LLC, a Nevada limited liability company (“Seller”). Seller and Buyer are each a “Party” and together the “Parties”. Capitalized terms used and not defined in this First Amendment have the respective meanings assigned to them in the Agreement (as defined below).

RECITALS
A. The Parties entered into that certain Renewable Power Purchase Agreement, dated as of May 31, 2022 (as may be amended, amended and restated, supplemented or otherwise modified from time to time in accordance with the terms thereof, the “Agreement”).

B. The Agreement contains a Guaranteed Construction Start Date of January 1, 2024 and a Guaranteed Commercial Operation Date of June 1, 2024, which Seller failed to achieve due to interconnection and permitting delays.

C. Buyer permitted the maximum Development Cure Period under the Agreement to extend the Guaranteed Construction Start Date and the Guaranteed Commercial Operation Date, but Seller was still unable to achieve the extended Guaranteed Construction Start Date and Guaranteed Commercial Operation Date.

D. Due to the imposition of import tariffs on Facility equipment and development and construction delays, as of the First Amendment Effective Date, the Parties have agreed to a Contract Price increase.

E. The maximum capacity of the geothermal facility that includes the Facility (“Project”) is 19.8 MW (“Maximum Capacity”). In addition to the Guaranteed Capacity of 13.0 MW, Seller has an existing agreement with Third Party for 3.0 MW of the Maximum Capacity (“Committed Capacity”). Therefore, the maximum available capacity of the Project is 3.8 MW (“Maximum Available Capacity”). The Parties intend to provide Buyer the exclusive right to purchase products relating to the Maximum Available Capacity at the Contract Price and an option to purchase products from New Capacity that may become available at the Project.

F. The Parties now intend to amend the Agreement as set forth herein.

NOW, THEREFORE, in consideration of the foregoing and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows:

1. Amendments to the Agreement.
(a) The Cover Sheet is deleted in its entirety and replaced with Attachment A to this First Amendment.
(b) The following defined terms are added to the definitions in Section 1.1 in alphabetic order.

1. “Additional Capacity” means Committed Capacity or Maximum Available Capacity, as applicable, from the Project (i) that is greater than the Guaranteed

Page 516 of 1037 ends

2 84109.00001\44914801.1
Capacity prior to the Commercial Operation Date or greater than the Installed Capacity after the Commercial Operation Date, but in either case, no greater than the Maximum Capacity minus the Guaranteed Capacity.

2. “Additional Capacity Initial Delivery Date” has the meaning set forth in Section

3.1(b)(ii).

3. “Committed Capacity” has the meaning set forth in the Recitals to this First Amendment.

4. “Contract Capacity” means (a) prior to the Commercial Operation Date, the Guaranteed Capacity, and (b) on and after the Commercial Operation Date, the Installed Capacity.

5. ” means the CAISO Scheduling Point named ,
which is part of CAISO Branch Group named .

6. “First Amendment” has the meaning set forth in the Preamble to the First Amendment.

7. “First Amendment Effective Date” has the meaning set forth in the Preamble to the First Amendment.

8. “Intertie” has the meaning set forth in the CAISO Tariff.

9. “Maximum Available Capacity” has the meaning set forth in the Recitals to this First Amendment.

10. “Maximum Capacity” has the meaning set forth in the Recitals to this First Amendment.

11. “New Capacity” has the meaning set forth in Section 3.1(c).

12. “Project” has the meaning set forth in the Recitals to this First Amendment.

13. “Shortfall Capacity” has the meaning set forth in Exhibit B.

14. “ ” means the CAISO Scheduling Point named ,
which is part of the CAISO Branch Group named .

15. “Third Party” means or any successor thereto.
(c) The following definitions are deleted in their entirety from Section 1.1 and replaced with the following:

1. “Installed Capacity” means the peak electrical output of the Facility, as measured in MW-AC at the Delivery Point, that achieves Commercial Operation, adjusted for ambient conditions on the date of the performance test, and as evidenced by a certificate substantially in the form attached as Exhibit I hereto. If Additional Capacity becomes available after the Commercial Operation Date, for all purposes under this Agreement “Installed Capacity” shall include the amount of Additional

Page 517 of 1037 ends

3 84109.00001\44914801.1
Capacity set forth in the Installed Capacity Certificate provided by Seller to Buyer pursuant to Section 3.1(b)(i).
(d) Section 2.2(f) is deleted in its entirety and replaced with the following:
“(f) Seller has obtained Firm Transmission Rights sufficient to deliver the Contract Capacity to the Delivery Point and has provided documentation of the same to Buyer;” (e) Section 3.1 is deleted in its entirety and replaced with the following:
“3.1 Purchase and Sale of Product/Contract Capacity
(a) Purchase and Sale of Product. Subject to the terms and conditions of this Agreement, during the Delivery Term, Buyer will purchase all the Product produced by or associated with the Installed Capacity from the Facility at the Contract Price, and Seller shall supply and deliver to Buyer all the Product produced by or associated with the Facility, except as permitted pursuant to Section 3.1(b)(v). At its sole discretion, Buyer may, during the Delivery Term, re-sell or use for another purpose all or a portion of the Product, provided that no such re-sale or use shall relieve Buyer of any obligations hereunder, including the last sentence of Section 5.2. During the Delivery Term, Buyer will have exclusive rights to offer, bid, or otherwise submit the Product, or any Capacity Attributes thereof, from the Facility after the Delivery Point for resale in the market, and retain and receive any and all related revenues. Buyer has no obligation to purchase from Seller any Product for which the associated Energy is not or cannot be delivered to the Delivery Point as a result of an outage of the Facility, a Force Majeure Event, a Curtailment Order, or relating to Additional Capacity prior to the Additional Capacity Initial Delivery Date. For the avoidance of doubt, settlement with CAISO shall not be deemed a sale by Seller to a third party of Product in contravention of this Section 3.1. (b) Contract Capacity. If at any time during the Term, Maximum Available Capacity becomes available as a result of plant performance as determined by Seller in its sole discretion or Committed Capacity becomes available, then, in addition to its rights to the Products associated with the Guaranteed Capacity, Buyer shall have the exclusive right to all Product associated with the Maximum Available Capacity or Committed Capacity, as applicable, at the Contract Price, except as otherwise provided in Section 3.1(b)(v). For the avoidance of doubt, except as otherwise set forth in this Agreement, Buyer shall have no right to the Committed Capacity or any products associated with such Committed Capacity unless such Committed Capacity becomes available and Buyer exercises its rights to such available Committed Capacity as set forth in this Section 3.1(b). (i) If Additional Capacity becomes available and Seller has obtained Firm Transmission rights to the Delivery Point for the Additional Capacity, Seller shall promptly provide Notice to Buyer setting forth the amount of Additional Capacity with Firm Transmission rights to the Delivery Point and the expected date that Product can be delivered from the Additional Capacity to the Delivery Point using Firm Transmission rights. If Seller’s Notice under this Section 3.1(b)(i) is provided to Buyer after the Commercial Operation Date, Seller shall concurrently provide to Buyer an Installed Capacity Certificate in the form of Exhibit I that shall be used for updating the Installed Capacity pursuant to Section 3.1(b)(iii). (ii) After Seller provides Notice to Buyer pursuant to Section 3.1(b)(i),

Page 518 of 1037 ends

4 84109.00001\44914801.1
Buyer shall cause the Project Participants to use commercially reasonable efforts to obtain Import Capability at the anticipated Delivery Point necessary to import the Net Qualifying Capacity from the Additional Capacity into the CAISO. If the Project Participants are unable to obtain Import Capability for some or all of the Additional Capacity initially, Buyer shall cause the Project Participants to seek Import Capability for the Additional Capacity in subsequent import capability allocations, unless Buyer determines in its reasonable judgment that continued efforts are not commercially reasonable; provided that, notwithstanding Section

3.1(b)(v), if the Project Participants are unable to obtain Import Capability for the full amount of Additional Capacity set forth in Seller’s Notice under Section

3.1(b)(i) in three (3) consecutive annual CAISO Import Capability allocation processes, Seller shall be free to market and sell any products to third parties relating to the Additional Capacity of the Facility not accepted by Buyer as set forth in this Section 3.1(b)(ii) and retain all proceeds related thereto. Seller shall use commercially reasonable efforts to support Buyer and Project Participants in obtaining such Import Capability. Buyer shall provide Notice to Seller when the Project Participants have secured Import Capability at the Delivery Point for some or all of the Additional Capacity, which Notice shall set forth the amount of Additional Capacity with Import Capability that Buyer will accept and the date upon which deliveries of Product to Buyer from some or all of the Additional Capacity shall commence under this Agreement (which date cannot be earlier than the Commercial Operation Date or the date set forth in Seller’s Notice pursuant to Section 3.1(b)(i)) (“Additional Capacity Initial Delivery Date”); provided that the Additional Capacity Initial Delivery Date will be extended to the actual date that Seller is able to deliver Additional Capacity to the Delivery Point using Firm Transmission rights if such date is after the date included in Seller’s Notice pursuant to Section 3.1(b)(i).
(iii) Commencing on the date of Buyer’s Notice under
Section 3.1(b)(ii), (A) for all purposes under the Agreement, the Guaranteed Capacity (if Buyer’s Notice is provided prior to the Commercial Operation Date) or Installed Capacity (if Buyer’s Notice is provided after the Commercial Operation Date will include the Additional Capacity accepted by Buyer pursuant to Buyer’s Notice), and (B) the term “Facility” shall be deemed to include the updated Guaranteed Capacity (if Buyer’s Notice is provided prior to the Commercial Operation Date) or updated Installed Capacity (if Buyer’s Notice is provided after the Commercial Operation Date). For the avoidance of doubt, if Buyer’s Notice indicates that it has obtained Import Capability for only some of the Additional Capacity, then the amount not accepted by Buyer will not be included in the Guaranteed Capacity or Installed Capacity, as applicable, unless or until Buyer provides additional Notice to Seller that it has obtained Import Capability for some or all of the Additional Capacity amounts initially not accepted by Buyer and then, only to the extent of the additional accepted Additional Capacity. (iv) Seller shall provide additional Development Security or Performance Security, as applicable, to Buyer within sixty (60) days of the date of Buyer’s Notice described in Section 3.1(b)(ii) corresponding to the amount of Additional Capacity accepted by Buyer. Provided, however, if this Agreement is terminated due to a Seller Event of Default after the date of Buyer’s Notice but prior to Seller’s posting of additional Development Security under this Section

Page 519 of 1037 ends

5 84109.00001\44914801.1

3.1(b)(iv), the Damage Payment shall be deemed to include Development Security in the amount of the Guaranteed Capacity, inclusive of the Additional Capacity accepted by Buyer.
(v) Notwithstanding any other provision of this Agreement, Seller may market and sell any products relating to the Additional Capacity of the Facility to third parties until the Additional Capacity Initial Delivery Date. Further, for any portion of the Additional Capacity that cannot be accepted by Buyer as of the Additional Capacity Initial Delivery Date, Seller may market and sell any products relating thereto until such time as Buyer accepts such incremental Available Capacity. For each month that includes sales of Product to third parties under this Section 3.1(b)(iii), Seller shall pay to Buyer any revenues realized from sales of Product associated with the Available Capacity to third parties (including for the avoidance of doubt, sales to the CAISO or other balancing authority) that are in excess of the revenues Seller would have received through sales of the Product associated with the Available Capacity to Buyer at the Contract Price. Buyer shall have no responsibility or liability to Seller if the third party revenues are less than the amount Seller would have received from Buyer for sales of Product associated with the Available Capacity under this Agreement. Buyer shall have no obligation for any payment associated with the Available Capacity until Seller has commenced deliveries to Buyer of Product relating to the Additional Capacity at the Delivery Point as of the Additional Capacity Initial Delivery Date. (c) Limitation on Seller’s Ability to Sell New Capacity. If Seller installs new power generation equipment at the Project that increases the capacity of the Project in excess of the Maximum Capacity (“New Capacity”), neither Seller nor Seller’s Affiliates may sell, market or deliver any Product associated with or attributable to such New Capacity to a party other than Buyer, unless (i) Seller has provided Buyer Notice of any New Capacity and the price and other material terms and conditions for which Seller will offer to sell product from such New Capacity to Buyer, and (ii) Buyer has, within sixty (60) days of receipt of such Notice, rejected Seller’s offer to purchase product associated with the New Capacity, in which case Seller or Seller’s Affiliates may sell, market or deliver any product that is associated with or attributable to the New Capacity to any third party on terms and conditions no more favorable than those offered to Buyer. If Buyer does not respond to Seller’s Notice of New Capacity within sixty (60) days of receipt of such Notice, Buyer will be deemed to have rejected Seller’s offer.

Neither Seller nor Seller’s Affiliates may sell or transfer the Project, or any part thereof, or land rights or interests in the Site (including the interconnection queue position of the Project) so long as the limitations contained in this Section 3.1(c) apply, unless the transferee agrees to be bound by the terms set forth in this Section 3.1(c) pursuant to a written agreement approved by Buyer in its reasonable discretion.

Seller shall indemnify and hold Buyer harmless from all benefits lost and other damages sustained by Buyer as a result of any breach by Seller of its covenants contained within this Section 3.1(c).”
(f) Section 3.7(c) is deleted in its entirety and replaced with the following:
“(c) Buyer shall cause the Project Participants to use commercially reasonable efforts to obtain the Import Capability at the anticipated Delivery Point(s) as necessary to import the

Page 520 of 1037 ends
Page 521 of 1037 ends

7 84109.00001\44914801.1

5. Miscellaneous.
(a) This First Amendment is governed by and construed in accordance with, the laws of the State of California, without regard to the conflict of laws provisions of such State. (b) This First Amendment shall inure to the benefit of and be binding upon each of the Parties and each of their respective successors and permitted assigns. (c) The headings in this First Amendment are for reference only and do not affect the interpretation of this First Amendment.
(d) This First Amendment may be executed in counterparts, each of which is deemed an original, but all of which constitutes one and the same agreement. Delivery of an executed counterpart of this First Amendment electronically or by facsimile shall be effective as delivery of an original executed counterpart of this First Amendment. (e) This First Amendment constitutes the sole and entire agreement between the Parties with respect to the subject matter contained herein, and supersedes all prior and contemporaneous understandings, agreements, representations and warranties, both written and oral, with respect to such subject matter.
(f) Each Party shall pay its own costs and expenses in connection with this First Amendment (including the fees and expenses of its advisors, accounts and legal counsel). [Signature Page Follows]

Page 522 of 1037 ends

8 IN WITNESS WHEREOF, the Parties have executed this First Amendment as of the First Amendment Effective Date.

FISH LAKE GEOTHERMAL LLC,
a Nevada limited liability company
By:

Name:

Title:

CALIFORNIA COMMUNITY POWER,
a California joint powers authority
By:

Name: Alexander Morris
Title: General Manager
Approved as to form:

By:

Name: Joshua Nelson
Title: General Counsel

Page 523 of 1037 ends
Page 524 of 1037 ends
Page 525 of 1037 ends

11 ATTACHMENT B

EXHIBIT A

FACILITY DESCRIPTION
Site Name: Fish Lake Geothermal Project
Site location: T1S, R35E, Sections 11 SE/4, 12 S/2, 13 N/2, 14 NE/4; All within APN: BLM 007- 021-01
Total Acreage: 996.1 ac
City: 18 miles north of Dyer, Nevada
County: Esmeralda
Zip Code: 89010
Latitude and Longitude:
37°51'39.33"N, 118° 2'2.69"W

Page 526 of 1037 ends
Page 527 of 1037 ends

13 ATTACHMENT C

EXHIBIT N

NOTICES
Fish Lake Geothermal LLC,
a Nevada Limited Liability Company
(“Seller”)
California Community Power,
a California joint powers authority (“Buyer”)
All Notices: All Notices:

Contract Management: Contract Management:

Invoices: Invoices:

Payments: Payments:

Wire Transfer: Wire Transfer:

Reference Numbers: Reference Numbers:

Credit and Collections: Credit and Collections:

Page 528 of 1037 ends

14 With additional Notices of an Event of
Default to:

With additional Notices of an Event of
Default to:

Page 529 of 1037 ends
Page 530 of 1037 ends

EXECUTION VERSION
Cover Sheet - 1

RENEWABLE POWER PURCHASE AGREEMENT

COVERSHEET
Seller: Fish Lake Geothermal LLC (“Seller”)
Buyer: California Community Power, a California joint powers authority (“Buyer”) Description of Facility: Fish Lake Geothermal Project, a 13 MW geothermal power plant, located in Esmeralda County, in the State of Nevada, as further described in Exhibit A.

Milestones:

Milestone Expected Date for
Completion
Evidence of Site Control Complete
CEC Pre-Certification Obtained September 1, 2022
Documentation of Conditional Use Permit if required:
[ ] CEQA, [ ] Cat Ex, [ ]Neg Dec, [ ] Mitigated Neg Dec, [ ] EIR, [X] NEPA
June 1, 2023
Seller’s receipt of facilities study results for Seller’s Interconnection Facilities November 1, 2022
Interconnection Agreement executed March 1, 2023
Major Equipment procured June 1, 2023
Federal and State discretionary permits obtained December 1, 2023 Guaranteed Construction Start Date January 1, 2024
Initial Synchronization May 1, 2024
Network Upgrades completed May 1, 2024
Expected Commercial Operation Date June 1, 2024
Guaranteed Commercial Operation Date June 1, 2024
Delivery Term: Twenty (20) Contract Years.

Expected Energy:

Page 531 of 1037 ends

EXECUTION VERSION
Cover Sheet - 2
Contract Year Expected Energy
(MWh)
1 – 20
Guaranteed Capacity: 13 MW
Contract Price:

Contract Year Contract Price
1 – 20
Product:
☒ Delivered Energy
☒ Green Attributes (Portfolio Content Category 1) associated with Delivered Energy ☒ Capacity Attributes
☒ Ancillary Services
Scheduling Coordinator: Seller
Security:

CP Security: $ /kW times the Guaranteed Capacity
Development Security: $ /kW times the Guaranteed Capacity Performance Security: $ /kW times the Installed Capacity

Page 532 of 1037 ends

TABLE OF CONTENTS
Page
i
ARTICLE 1 DEFINITIONS....................................................................................................... 5

1.1 Contract Definitions............................................................................................... 5

1.2 Rules of Interpretation ......................................................................................... 25 ARTICLE 2 TERM; CONDITIONS PRECEDENT.............................................................. 26

2.1 Contract Term. ..................................................................................................... 26

2.2 Condition Precedent............................................................................................. 26

2.3 Development; Construction; Progress Reports.................................................... 28

2.4 Remedial Action Plan .......................................................................................... 28 ARTICLE 3 PURCHASE AND SALE.................................................................................... 28

3.1 Purchase and Sale of Product............................................................................... 28

3.2 Sale of Green Attributes....................................................................................... 29

3.3 Imbalance Energy. ............................................................................................... 29

3.4 Ownership of Renewable Energy Incentives....................................................... 29

3.5 Future Environmental Attributes. ........................................................................ 29

3.6 Test Energy. ......................................................................................................... 29

3.7 Capacity Attributes. ............................................................................................. 30

3.8 Resource Adequacy Failure ................................................................................. 31

3.9 CEC Certification and Verification. .................................................................... 31

3.10 [Reserved]. ........................................................................................................... 32

3.11 California RPS Standard Terms and Conditions. ................................................ 32

3.12 Compliance Expenditure Cap. ............................................................................. 32 ARTICLE 4 OBLIGATIONS AND DELIVERIES ............................................................... 33

4.1 Delivery................................................................................................................ 33

4.2 Title and Risk of Loss. ......................................................................................... 34

4.3 Forecasting........................................................................................................... 34

4.4 Dispatch Down/Curtailment ................................................................................ 35

4.5 [Reserved]............................................................................................................ 35

4.6 Reduction in Delivery Obligation........................................................................ 35

4.7 Guaranteed Energy Production. ........................................................................... 36

4.8 WREGIS .............................................................................................................. 36

4.9 Interconnection Capacity ..................................................................................... 38

4.10 Green-E Certification........................................................................................... 38 ARTICLE 5 TAXES.................................................................................................................. 38

5.1 Allocation of Taxes and Charges......................................................................... 38

5.2 Cooperation.......................................................................................................... 38 ARTICLE 6 MAINTENANCE OF THE FACILITY ............................................................ 38

6.1 Maintenance of the Facility. ................................................................................ 38

6.2 Maintenance of Health and Safety....................................................................... 38

6.3 Shared Facilities................................................................................................... 39

Page 533 of 1037 ends

EXECUTION VERSION
ii
ARTICLE 7 METERING......................................................................................................... 39

7.1 Metering............................................................................................................... 39

7.2 Meter Verification................................................................................................ 40 ARTICLE 8 INVOICING AND PAYMENT; CREDIT........................................................ 40

8.1 Invoicing. ............................................................................................................. 40

8.2 Payment................................................................................................................ 40

8.3 Books and Records. ............................................................................................. 41

8.4 Invoice Adjustments. ........................................................................................... 41

8.5 Billing Disputes. .................................................................................................. 41

8.6 Netting of Payments............................................................................................. 42

8.7 Seller’s CP Security. ............................................................................................ 42

8.8 Seller’s Development Security. ......................................................................... 42

8.9 Seller’s Performance Security.............................................................................. 42

8.10 First Priority Security Interest in Cash or Cash Equivalent Collateral ................ 42

8.11 Buyer Credit Arrangements. ................................................................................ 43 ARTICLE 9 NOTICES ............................................................................................................. 44

9.1 Addresses for the Delivery of Notices................................................................. 44

9.2 Acceptable Means of Delivering Notice.............................................................. 45 ARTICLE 10 FORCE MAJEURE........................................................................................... 45

10.1 Definition ............................................................................................................. 45

10.2 Termination Following Force Majeure Event...................................................... 46

10.3 Notice for Force Majeure..................................................................................... 46

10.4 No Liability If a Force Majeure Event Occurs .................................................... 46 ARTICLE 11 DEFAULTS; REMEDIES; TERMINATION ................................................ 47

11.1 Events of Default ................................................................................................. 47

11.2 Remedies; Declaration of Early Termination Date.............................................. 50

11.3 Termination Payment........................................................................................... 50

11.4 Notice of Payment of Termination Payment ....................................................... 51

11.5 Disputes With Respect to Termination Payment ................................................. 51

11.6 Limitation on Seller’s Ability to Make or Agree to Third-Party Sales from the Facility after Early Termination Date ............................................................ 51

11.7 Rights And Remedies Are Cumulative................................................................ 52

11.8 Mitigation............................................................................................................. 52

11.9 Pass Through of Buyer Liability.......................................................................... 52 ARTICLE 12 LIMITATION OF LIABILITY AND EXCLUSION OF
WARRANTIES............................................................................................ 52

12.1 No Consequential Damages................................................................................. 52

12.2 Waiver and Exclusion of Other Damages............................................................ 52

12.3 Limitation on Pre-COD Liability......................................................................... 53 ARTICLE 13 REPRESENTATIONS AND WARRANTIES; AUTHORITY..................... 53

Page 534 of 1037 ends

EXECUTION VERSION
iii

13.1 Seller’s Representations and Warranties. ............................................................ 53

13.2 Buyer’s Representations and Warranties............................................................. 55

13.3 General Covenants............................................................................................... 55

13.4 Seller’s Covenants ............................................................................................... 56 ARTICLE 14 ASSIGNMENT .................................................................................................. 57

14.1 General Prohibition on Assignments ................................................................... 57

14.2 Collateral Assignment.......................................................................................... 57

14.3 Permitted Assignment by Seller........................................................................... 58

14.4 Buyer Financing Assignment............................................................................... 58 ARTICLE 15 DISPUTE RESOLUTION ................................................................................ 58

15.1 Governing Law; Venue........................................................................................ 58

15.2 Dispute Resolution............................................................................................... 59

15.3 Attorneys’ Fees. ................................................................................................... 59 ARTICLE 16 INDEMNIFICATION ....................................................................................... 59

16.1 Indemnity ............................................................................................................. 59

16.2 Notice of Claim. ................................................................................................. 59

16.3 Failure to Provide Notic ..................................................................................... 59

16.4 Defense of Claims .............................................................................................. 60

16.5 Subrogation of Rights .......................................................................................... 60

16.6 Rights and Remedies are Cumulative. .............................................................. 61 ARTICLE 17 INSURANCE...................................................................................................... 61

17.1 Insurance .............................................................................................................. 61 ARTICLE 18 CONFIDENTIAL INFORMATION ............................................................... 62

18.1 Definition of Confidential Information................................................................ 62

18.2 Duty to Maintain Confidentiality......................................................................... 63

18.3 Irreparable Injury; Remedies ............................................................................... 63

18.4 Disclosure to Lenders, Etc. .................................................................................. 63

18.5 Press Releases...................................................................................................... 63 ARTICLE 19 MISCELLANEOUS .......................................................................................... 63

19.1 Entire Agreement; Integration; Exhibits.............................................................. 63

19.2 Amendments ........................................................................................................ 64

19.3 No Waiver............................................................................................................ 64

19.4 No Agency, Partnership, Joint Venture or Lease................................................. 64

19.5 Severability .......................................................................................................... 64

19.6 Mobile-Sierra ....................................................................................................... 64

19.7 Counterparts......................................................................................................... 65

19.8 Electronic Delivery .............................................................................................. 65

19.9 Binding Effect...................................................................................................... 65

19.10 No Recourse to Members of Buyer ..................................................................... 65

19.11 Forward Contract ................................................................................................. 65

19.12 Further Assurances............................................................................................... 65

Page 535 of 1037 ends

EXECUTION VERSION
iv
Exhibits:

Exhibit A Facility Description
Exhibit B Major Project Development Milestones and Commercial Operation Exhibit C Compensation
Exhibit D Scheduling Coordinator Responsibilities
Exhibit E Progress Reporting Form
Exhibit F-1 Form of Average Expected Energy Report
Exhibit F-2 Form of Monthly Available Capacity Report
Exhibit G Guaranteed Energy Production Damages Calculation Exhibit H Form of Commercial Operation Date Certificate Exhibit I Form of Installed Capacity Certificate
Exhibit J Form of Construction Start Date Certificate
Exhibit K Form of Letter of Credit
Exhibit L Form of Buyer Liability Pass Through Agreement Exhibit M Form of Replacement RA Notice
Exhibit N Notices
Exhibit O Operational Characteristics
Exhibit P Metering Diagram
Exhibit Q Form of Collateral Assignment Agreement
Exhibit R [Reserved]
Exhibit S Project Participants and Liability Shares

Page 536 of 1037 ends

5 EXECUTION VERSION

RENEWABLE POWER PURCHASE AGREEMENT
This Renewable Power Purchase Agreement (“Agreement”) is entered into as of May 31, 2022 (the “Effective Date”), between Buyer and Seller. Buyer and Seller are sometimes referred to herein individually as a “Party” and jointly as the “Parties.” All capitalized terms used in this Agreement are used with the meanings ascribed to them in Article 1 to this Agreement.

RECITALS
WHEREAS, Seller intends to develop, design, permit, construct, own, and operate the Facility; and
WHEREAS, Seller desires to sell, and Buyer desires to purchase, on the terms and conditions set forth in this Agreement, the Product; NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, and for other good and valuable consideration, the sufficiency and adequacy of which are hereby acknowledged, the Parties agree to the following:

ARTICLE 1

DEFINITIONS

1.1 Contract Definitions. The following terms, when used herein with initial capitalization, shall have the meanings set forth below:
“AC” means alternating current.
“Accepted Compliance Costs” has the meaning set forth in Section 3.12(d). “Adjusted Energy Production” has the meaning set forth in Exhibit G. “Affiliate” means, with respect to any Person, each Person that directly or indirectly controls, is controlled by, or is under common control with such designated Person. For purposes of this definition and the definition of “Permitted Transferee”, “control”, “controlled by”, and “under common control with”, as used with respect to any Person, shall mean (a) the direct or indirect right to cast at least fifty percent (50%) of the votes exercisable at an annual general meeting (or its equivalent) of such Person or, if there are no such rights, ownership of at least fifty percent (50%) of the equity or other ownership interest in such Person, or (b) the right to direct the policies or operations of such Person.
“Agreement” has the meaning set forth in the Preamble and includes the Cover Sheet and any Exhibits, schedules and any written supplements hereto. “Ancillary Services” means all ancillary services, products and other attributes, if any, associated with the Installed Capacity of the Facility. “Attestation” has the meaning set forth in Section 4.10.

Page 537 of 1037 ends

EXECUTION VERSION
6 “Available Generating Capacity” means the capacity of the Facility, expressed in whole MWs, that is mechanically available to generate Energy. “Bankrupt” means with respect to any entity, such entity that (a) files a petition or otherwise commences, authorizes or acquiesces in the commencement of a proceeding or cause of action under any bankruptcy, insolvency, reorganization or similar Law, (b) has any such petition filed or commenced against it which remains unstayed or undismissed for a period of ninety (90) days, (c) makes an assignment or any general arrangement for the benefit of creditors, (d) otherwise becomes bankrupt or insolvent (however evidenced), (e) has a liquidator, administrator, receiver, trustee, conservator or similar official appointed with respect to it or any substantial portion of its property or assets, or (f) is generally unable to pay its debts as they fall due. “Business Day” means any day except a Saturday, Sunday, or a Federal Reserve Bank holiday in California. A Business Day begins at 8:00 a.m. and ends at 5:00 p.m. Pacific Prevailing Time (“PPT”) for the Party sending a Notice, or payment, or performing a specified action. “Buyer” means California Community Power, a California joint powers authority. “Buyer Default” means a failure by Buyer or its agents to perform Buyer’s obligations hereunder and includes an Event of Default of Buyer.
“Buyer Liability Pass Through Agreement” means an agreement by and between Seller, Buyer and the applicable Project Participant, in the form set forth in Exhibit L. “Buyer’s WREGIS Account” has the meaning set forth in Section 4.8(a). “CAISO” means the California Independent System Operator Corporation, or any successor entity performing similar functions.
“CAISO Approved Meter” means a CAISO approved revenue quality meter or meters, CAISO-approved data processing gateway or remote intelligence gateway, telemetering equipment and data acquisition services sufficient for monitoring, recording and reporting, in real time, all Delivered Energy delivered to the Delivery Point. “CAISO Grid” has the same meaning as “CAISO Controlled Grid” as defined in the CAISO Tariff.
“CAISO Operating Order” means the “operating order” defined in Section 37.2.1.1 of the CAISO Tariff.
“CAISO Tariff” means the California Independent System Operator Corporation Agreement and Tariff, Business Practice Manuals (BPMs), and Operating Procedures, including the rules, protocols, procedures and standards attached thereto, as the same may be amended or modified from time-to-time and approved by FERC.
“California Renewables Portfolio Standard” or “RPS” means the renewable energy program and policies established by California State Senate Bills 1038 (2002), 1078 (2002), 107 (2008), X-1 2 (2011), 350 (2015), and 100 (2018) as codified in, inter alia, California Public

Page 538 of 1037 ends

EXECUTION VERSION
7 Utilities Code Sections 399.11 through 399.31 and California Public Resources Code Sections 25740 through 25751, as such provisions are amended or supplemented from time to time. “Capacity Attribute” means any current or future defined characteristic, certificate, tag, credit, or accounting construct associated with the amount of power that the Facility can generate or deliver to the Delivery Point at a particular moment and that can be purchased and sold under CAISO market rules, including Resource Adequacy Benefits. “Capacity Damages” has the meaning set forth in Exhibit B. “CEC” means the California Energy Commission, or any successor agency performing similar statutory functions.
“CEC Certification and Verification” means that the CEC has certified (or, with respect to periods before the date that is one hundred eighty (180) days following the Commercial Operation Date, that the CEC has pre-certified, as such date may be extended pursuant to Section

3.9) that the Facility is an Eligible Renewable Energy Resource for purposes of the California Renewables Portfolio Standard and that all Delivered Energy delivered to the Delivery Point qualifies as generation from an Eligible Renewable Energy Resource. “CEC Precertification” means that the CEC has issued a precertification for the Facility indicating that the planned operations of the Facility would comply with applicable CEC requirements for CEC Certification and Verification.
“CEQA” means the California Environmental Quality Act.
“Change of Control” means, except in connection with public market transactions of equity interests or capital stock of Seller’s Ultimate Parent, any circumstance in which Ultimate Parent ceases to own, directly or indirectly through one or more intermediate entities, at least fifty percent (50%) of the outstanding equity interests in Seller; provided that in calculating ownership percentages for all purposes of the foregoing:
(a) any ownership interest in Seller held by Ultimate Parent indirectly through one or more intermediate entities shall not be counted towards Ultimate Parent’s ownership interest in Seller unless Ultimate Parent directly or indirectly owns more than fifty percent (50%) of the outstanding equity interests in each such intermediate entity; and (b) ownership interests in Seller owned directly or indirectly by any Lender (including any cash equity and tax equity investor directly or indirectly providing financing or refinancing for the Facility or purchasing equity ownership interests of Seller or its Affiliates, and any trustee or agent or similar representative acting on their behalf) or assignee or transferee thereof shall be excluded from the total outstanding equity interests in Seller. “CIRA Tool” means the CAISO Customer Interface for Resource Adequacy. “Claim” has the meaning set forth in Section 16.2.
“COD Certificate” has the meaning set forth in Exhibit B.

Page 539 of 1037 ends

EXECUTION VERSION
8 “Commercial Operation” has the meaning set forth in Exhibit B. “Commercial Operation Date” has the meaning set forth in Exhibit B. “Commercial Operation Delay Damages” means an amount equal to (a) the Development Security amount required hereunder, divided by (b) sixty (60). “Compliance Action” has the meaning set forth in Section 3.12(b). “Compliance Expenditure Cap” has the meaning set forth in Section 3.12(b). “Compliant Project Participant” means a Project Participant that is not a Defaulted Project Participant.
“Confidential Information” has the meaning set forth in Section 18.1. “Construction Start” has the meaning set forth in Exhibit B. “Construction Start Date” has the meaning set forth in Exhibit B. “Contract Price” has the meaning set forth on the Cover Sheet. “Contract Term” has the meaning set forth in Section 2.1(a). “Contract Year” means a period of twelve (12) consecutive months. The first Contract Year shall commence on the Commercial Operation Date and each subsequent Contract Year shall commence on the anniversary of the Commercial Operation Date. “Costs” means, with respect to the Non-Defaulting Party, brokerage fees, commissions and other similar third-party transaction costs and expenses reasonably incurred by such Party either in terminating any arrangement pursuant to which it has hedged its obligations or entering into new arrangements which replace this Agreement; and all reasonable attorneys’ fees and expenses incurred by the Non-Defaulting Party in connection with terminating the Agreement. “Cover Sheet” means the cover sheet to this Agreement, which is incorporated into this Agreement.
“CP Satisfaction Date” means the date on which the condition precedent described in Section 2.1(b) has been satisfied (or waived in writing by the Parties). “CP Security” means (i) cash or (ii) a Letter of Credit in the amount set forth on the Cover Sheet.
“CPM Soft Offer Cap” has the meaning set forth in the CAISO Tariff. “CPUC” means the California Public Utilities Commission, or any successor agency performing similar statutory functions.

Page 540 of 1037 ends

EXECUTION VERSION
9 “Credit Rating” means, with respect to any entity, the rating then assigned to such entity’s unsecured, senior long-term debt obligations (not supported by third-party credit enhancements) or if such entity does not have a rating for its senior unsecured long-term debt, then the rating then assigned to such entity as an issuer rating by S&P or Moody’s. If ratings by S&P and Moody’s are not equivalent, the lower rating shall apply.
“CRS” has the meaning set forth in Section 4.10.
“Cure Plan” has the meaning set forth in Section 11.1(b)(vi). “Curtailment Cap” is the yearly quantity per Contract Year, in MWh, equal to fifty (50) hours multiplied by the Installed Capacity.
“Curtailment Order” means any of the following:
(a) CAISO or Transmission Provider orders, directs, alerts, or provides notice to a Party, including a CAISO Operating Order, to curtail deliveries of Delivered Energy for the following reasons: (i) any System Emergency, or (ii) any warning of an anticipated System Emergency, or warning of an imminent condition or situation, which jeopardizes CAISO’s or the Transmission Provider’s electric system integrity or the integrity of other systems to which CAISO or the Transmission Provider is connected;
(b) a curtailment ordered by the Transmission Provider for reasons including, but not limited to, (i) any situation that affects normal function of the electric system including, but not limited to, any abnormal condition that requires action to prevent circumstances such as equipment damage, loss of load, or abnormal voltage conditions, or (ii) any warning, forecast or anticipation of conditions or situations that jeopardize the Transmission Provider’s electric system integrity or the integrity of other systems to which the Transmission Provider is connected; (c) a curtailment ordered by the CAISO or Transmission Provider due to scheduled or unscheduled maintenance on the Transmission Provider’s or CAISO’s transmission facilities that prevents (i) Buyer from receiving or (ii) Seller from delivering Delivered Energy to the Delivery Point; or
(d) a curtailment in accordance with Seller’s obligations under its Interconnection Agreement with the Transmission Provider or distribution operator. “Curtailment Period” means the period of time, as measured using current Settlement Intervals, during which generation from the Facility is reduced pursuant to a Curtailment Order; provided, the Curtailment Period shall be inclusive of the time required for the Facility to ramp down and ramp up.
“Daily Delay Damages” means an amount equal to (a) the Development Security amount required hereunder, divided by (b) ninety (90).
“Damage Payment” means the dollar amount that equals the amount of the Development Security.

Page 541 of 1037 ends

EXECUTION VERSION
10 “Day-Ahead Forecast” has the meaning set forth in Section 4.3(c). “Day-Ahead Market” has the meaning set forth in the CAISO Tariff. “Day-Ahead Schedule” has the meaning set forth in the CAISO Tariff. “Deemed Delivered Energy” means the amount of electrical energy above the Curtailment Cap expressed in MWh that the Facility would have produced and delivered to the Delivery Point, but that is not produced by the Facility during a Market Curtailment Period, which amount shall be calculated as the difference between (a) the product of (i) the arithmetic average of the Facility’s metered output rate, in MW, immediately before and after such Market Curtailment Period, as applicable, by (ii) the duration of such Market Curtailment Period, as applicable, less (b) the amount of Delivered Energy delivered to the Delivery Point during the Market Curtailment Period, if any; provided, if the applicable difference is negative, the Deemed Delivered Energy shall be zero (0).
“Deemed Delivered RA” means the amount of Net Qualifying Capacity expressed in MW that the Facility would have delivered to the Delivery Point, but for (i) the failure of the Project Participants to obtain Import Capability sufficient to allow for the importation of such capacity into the CAISO, or (ii) a Force Majeure Event as provided in Section 3.7(h). “Defaulted Liability Share” means the Liability Share of a Defaulted Project Participant. “Defaulted Project Participant” means a Project Participant that has incurred but not cured a Project Participant Payment Default, including any Project Participant whose rights under the Project Participation Agreement have been suspended or terminated. “Defaulting Party” has the meaning set forth in Section 11.1(a). “Deficient Month” has the meaning set forth in Section 4.8(e). “Delivered Energy” means for each hour, the electric Energy generated by the Facility, net of Electrical Losses and Station Use, and delivered to the Delivery Point. “Delivery Point” has the meaning set forth in Exhibit A. “Delivery Term” shall mean the period of Contract Years set forth on the Cover Sheet beginning on the Commercial Operation Date, unless terminated earlier in accordance with the terms and conditions of this Agreement.
“Development Cure Period” has the meaning set forth in Exhibit B. “Development Security” means (i) cash or (ii) a Letter of Credit in the amount set forth on the Cover Sheet.
“Disclosing Party” has the meaning set forth in Section 18.2. “Early Termination Date” has the meaning set forth in Section 11.2(a).

Page 542 of 1037 ends

EXECUTION VERSION
11 “Effective Date” has the meaning set forth in the Preamble. “Effective Flexible Capacity” means the net capacity of a Resource Adequacy Resource that can be counted towards Flexible Capacity Requirements, as identified from time to time by the CAISO Tariff, the Resource Adequacy Rulings, or by any other Governmental Authority having jurisdiction.
“Electrical Losses” means all transmission or transformation losses or gains for the Facility in accordance with CAISO’s rules for Pseudo-Tie Resources. “Eligible Renewable Energy Resource” has the meaning set forth in California Public Utilities Code Section 399.12(e) and California Public Resources Code Section 25741(a), as either code provision is amended or supplemented from time to time. “Energy” means electrical energy generated by the Facility. “Event of Default” has the meaning set forth in Section 11.1. “Expected Commercial Operation Date” is the date set forth on the Cover Sheet by which Seller reasonably expects to achieve Commercial Operation. “Expected Energy” means the quantity of Energy attributable to the Installed Capacity that Seller expects to be able to deliver from the Facility during each Contract Year in the quantity specified on the Cover Sheet.
“Facility” means the geothermal generating facility described on the Cover Sheet and in Exhibit A, located at the Site, and including mechanical equipment and associated facilities and equipment required to deliver Energy to the Delivery Point. “Facility Meter” means the CAISO Approved Meter that will measure all electric energy generated by the Facility, including Delivered Energy. Without limiting Seller’s obligation to deliver Delivered Energy to the Delivery Point, the Facility Meter may be located at the low voltage or the high voltage side of the main step-up transformer, and Delivered Energy will be subject to adjustment in accordance with CAISO meter requirements and Prudent Operating Practices to account for Electrical Losses and Station Use. “FCR Showings” means the Flexible Capacity Requirement showings (or similar or successor showings) that Project Participants are required to make to the CPUC (and, to the extent authorized by the CPUC, to the CAISO) pursuant to the Resource Adequacy Rulings and the CAISO Tariff.
“FERC” means the Federal Energy Regulatory Commission, or any successor government agency.
“Firm Clean Resource” means a resource that meets the requirements of CPUC Decision 21-06-035, including that such resource (i) has at least an eighty percent (80%) capacity factor and zero on-site emissions or otherwise qualifies under the California Renewable Portfolio Standard (RPS) program eligibility rules as PCC1, (ii) is incremental to the CPUC’s baseline list, and (iii)

Page 543 of 1037 ends

EXECUTION VERSION
12 is a Resource Adequacy Resource that is eligible to provide RA Capacity as set forth in the Resource Adequacy Rulings.
“Firm Transmission” means transmission that cannot be curtailed within an operating hour for economic reasons or for higher priority transmission within the operating hour. “Flexible Capacity Requirements” means the flexible capacity requirements established by the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority having jurisdiction.
“Force Majeure Event” has the meaning set forth in Section 10.1. “Forced Facility Outage” means an unexpected failure of one or more components of the Facility that prevents Seller from generating Energy or making Delivered Energy available at the Delivery Point and that is not the result of a Force Majeure Event. “Forced Labor” has the meaning set forth in Section 13.4(c). “Forward Certificate Transfers” has the meaning set forth in Section 4.8(a). “Future Environmental Attributes” shall mean any and all generation attributes other than Green Attributes or Renewable Energy Incentives under the RPS regulations or under any and all other international, federal, regional, state or other law, rule, regulation, bylaw, treaty or other intergovernmental compact, decision, administrative decision, program (including any voluntary compliance or membership program), competitive market or business method (including all credits, certificates, benefits, and emission measurements, reductions, offsets and allowances related thereto) that are attributable, now, or in the future, to the generation of electrical energy by the Facility. Future Environmental Attributes do not include investment tax credits or production tax credits associated with the construction or operation of the Facility, or other financial incentives in the form of credits, reductions, or allowances associated with the Facility that are applicable to a state or federal income taxation obligation.
“Gains” means, with respect to any Party, an amount equal to the present value of the economic benefit to it, if any (exclusive of Costs), resulting from the termination of this Agreement for the remaining Contract Term, determined in a commercially reasonable manner. Factors used in determining the economic benefit to a Party may include, without limitation, reference to information supplied by one or more third parties, which shall exclude Affiliates of the Non-Defaulting Party, including without limitation, quotations (either firm or indicative) of relevant rates, prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs (e.g., NP-15), all of which should be calculated for the remaining Contract Term, and include the value of Green Attributes and Capacity Attributes.
“Governmental Authority” means any federal, state, provincial, local or municipal government, any political subdivision thereof or any other governmental, congressional or parliamentary, regulatory, or judicial instrumentality, authority, body, agency, department, bureau,

Page 544 of 1037 ends

EXECUTION VERSION
13 or entity with authority to bind a Party at law, including CAISO; provided, however, that “Governmental Authority” shall not in any event include any Party. “Green Attributes” means any and all credits, benefits, emissions reductions, offsets, and allowances, howsoever entitled, attributable to the generation from the Facility and its displacement of conventional energy generation. Green Attributes include but are not limited to Renewable Energy Credits, as well as: (1) any avoided emissions of pollutants to the air, soil or water such as sulfur oxides (SOx), nitrogen oxides (NOx), carbon monoxide (CO) and other pollutants; (2) any avoided emissions of carbon dioxide (CO2), methane (CH4), nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride and other greenhouse gases (GHGs) that have been determined by the United Nations Intergovernmental Panel on Climate Change, or otherwise by law, to contribute to the actual or potential threat of altering the Earth’s climate by trapping heat in the atmosphere; (3) the reporting rights to these avoided emissions, such as Green Tag Reporting Rights. Green Tags are accumulated on a MWh basis and one Green Tag represents the Green Attributes associated with one (1) MWh of Delivered Energy. Green Attributes do not include (i) any energy, capacity, reliability or other power attributes from the Facility, (ii) production tax credits associated with the construction or operation of the Facility and other financial incentives in the form of credits, reductions, or allowances associated with the Facility that are applicable to a state or federal income taxation obligation, (iii) fuel-related subsidies or “tipping fees” that may be paid to Seller to accept certain fuels, or local subsidies received by the generator for the destruction of particular preexisting pollutants or the promotion of local environmental benefits, or (iv) emission reduction credits encumbered or used by the Facility for compliance with local, state, or federal operating or air quality permits. If the Facility is a biomass or landfill gas facility and Seller receives any tradable Green Attributes based on the greenhouse gas reduction benefits or other emission offsets attributed to its fuel usage, it shall provide Buyer with sufficient Green Attributes to ensure that there are zero net emissions associated with the production of electricity from the Facility.
“Green Tag Reporting Rights” means the right of a purchaser of renewable energy to report ownership of accumulated “green tags” in compliance with and to the extent permitted by applicable Law and include, without limitation, rights under Section 1605(b) of the Energy Policy Act of 1992, and any present or future federal, state or local certification program or emissions trading program, including pursuant to the WREGIS Operating Rules. “Guaranteed Amount” has the meaning set forth in each Project Participant’s Buyer Liability Pass Through Agreement, which amount may be different for each Project Participant given each Project Participant’s Liability Share.
“Guaranteed Capacity” means the net dependable generating capacity of the Facility in the amount set forth on the Cover Sheet, as measured in accordance with the CAISO Tariff in MW(AC)at the Interconnection Point, which Seller commits to install pursuant to this Agreement. “Guaranteed Commercial Operation Date” means the date set forth on the Cover Sheet, as such date may be extended by Seller’s payment of Commercial Operation Delay Damages pursuant to Section 2(b) of Exhibit B and/or a Development Cure Period pursuant to Section 4 of Exhibit B.

Page 545 of 1037 ends

EXECUTION VERSION
14 “Guaranteed Construction Start Date” means the date set forth on the Cover Sheet, as such date may be extended by Seller’s payment of Daily Delay Damages pursuant to Section 1(b) of Exhibit B and/or a Development Cure Period pursuant to Section 4 of Exhibit B. “Guaranteed Energy Production” means for the first (1st) Performance Measurement Period, of the total aggregate Expected Energy, measured in MWh, and for the second (2nd) Performance Measurement Period and each Performance Measurement Period thereafter, of the total aggregate Expected Energy, measured in MWh, for the applicable Performance Measurement Period.
“Guaranteed Net Qualifying Capacity” means, at any point in time, “Imbalance Energy” means the amount of Energy in MWh, in any given Settlement Period or Settlement Interval, by which the amount of Delivered Energy deviates from the amount of Scheduled Energy.
“Import Capability” means that portion of the Maximum Import Capability allocated by the CAISO that is necessary to support the importation of Resource Adequacy Benefits from the Facility into the CAISO market in an amount equal to the Guaranteed Net Qualifying Capacity. “Indemnifiable Loss(es)” has the meaning set forth in Section 16.1(a). “Indemnified Group” has the meaning set forth in Section 16.1(a). “Indemnified Party” has the meaning set forth in Section 16.1(a). “Indemnifying Party” has the meaning set forth in Section 16.1(a). “Initial Liability Share” means the Liability Share of each Project Participant shown on Exhibit S as of the Effective Date.
“Initial Synchronization” means the initial delivery of Energy to the Delivery Point. “Installed Capacity” means the peak electrical output of the Facility, as measured in MW(AC) at the Delivery Point, that achieves Commercial Operation, adjusted for ambient conditions on the date of the performance test, and as evidenced by a certificate substantially in the form attached as Exhibit I hereto.
“Interconnection Agreement” means the interconnection agreement entered into by Seller pursuant to which the Facility will be interconnected with the Transmission System, providing for interconnection capacity available or allocable to the Facility, and pursuant to which

Page 546 of 1037 ends

EXECUTION VERSION
15 Seller’s Interconnection Facilities and any other Interconnection Facilities will be constructed, operated and maintained during the Contract Term.
“Interconnection Capacity Limit” means the maximum instantaneous amount of Energy that is permitted to be delivered by the Facility to the Interconnection Point under Seller’s Interconnection Agreement, in an amount no less than 19 MW. “Interconnection Facilities” means the interconnection facilities, control and protective devices and metering facilities required to connect the Facility with the Transmission System in accordance with the Interconnection Agreement.
“Interconnection Point” has the meaning set forth in Exhibit A. “Interest Rate” has the meaning set forth in Section 8.2. “Inter-SC Trade” or “IST” has the meaning set forth in the CAISO Tariff. “ITC” means the investment tax credit established pursuant to Section 48 of the United States Internal Revenue Code of 1986.
“Joint Powers Act” means the Joint Exercise of Powers Act of the State of California (Government Code Section 6500 et seq.).
“Joint Powers Agreement” means that certain Joint Powers Agreement dated January 29, 2021, as amended from time to time, under which Buyer is organized as a Joint Powers Authority in accordance with the Joint Powers Act.
“Law” means any applicable law, statute, rule, regulation, decision, writ, order, decree or judgment, permit or any interpretation thereof, promulgated or issued by a Governmental Authority.
“Lender” means, collectively, any Person (i) providing senior or subordinated construction, interim, back leverage or long-term debt, equity or tax equity financing or refinancing for or in connection with the development, construction, purchase, installation or operation of the Facility, whether that financing or refinancing takes the form of private debt (including back-leverage debt), equity (including tax equity), public debt or any other form (including financing or refinancing provided to a member or other direct or indirect owner of Seller), including any equity or tax equity investor directly or indirectly providing financing or refinancing for the Facility or purchasing equity ownership interests of Seller and/or its Affiliates, and any trustee or agent or similar representative acting on their behalf, (ii) providing interest rate or commodity protection under an agreement hedging or otherwise mitigating the cost of any of the foregoing obligations or (iii) participating in a lease financing (including a sale leaseback or leveraged leasing structure) with respect to the Facility. “Letter(s) of Credit” means one or more irrevocable, standby letters of credit issued by a U.S. commercial bank or a foreign bank with a U.S. branch with such bank (a) having a Credit Rating of at least A- with an outlook designation of “stable” from S&P or A3 with an outlook

Page 547 of 1037 ends

EXECUTION VERSION
16 designation of “stable” from Moody’s or (b) being reasonably acceptable to Buyer, in a form substantially similar to the letter of credit set forth in Exhibit K. “Liability Share” means the percentage amount set forth for each Project Participant in Exhibit S.
“Licensed Professional Engineer” means an independent, professional engineer selected by Seller and reasonably acceptable to Buyer, licensed in the State of Nevada. “Local Capacity Area” has the meaning set forth in the CAISO Tariff. “Local Capacity Area Resource” has the meaning set forth in the CAISO Tariff. “Locational Marginal Price” or “LMP” has the meaning set forth in the CAISO Tariff. “Losses” means, with respect to the Non-Defaulting Party, an amount equal to the present value of the economic loss to it, if any (exclusive of Costs), resulting from termination of this Agreement for the remaining Contract Term, determined in a commercially reasonable manner.

Factors used in determining economic loss to a Party may include reference to information supplied by one or more third parties, which shall exclude Affiliates of the Non-Defaulting Party, including quotations (either firm or indicative) of relevant rates, prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs, all of which should be calculated for the remaining Contract Term and must include the value of Green Attributes, Capacity Attributes, and Renewable Energy Incentives. Seller’s lost revenue under this Agreement resulting from a Buyer Default shall not be considered to be consequential, incidental, punitive, exemplary or indirect or business interruption damages for purposes of determining Losses under this Agreement. “Lost Output” means the amount of Energy that Seller could reasonably have delivered to Buyer but was prevented from delivering to Buyer by reason of any Force Majeure Events, Curtailment Period, System Emergency, or Buyer Default. The Lost Output shall be calculated in the same manner as Deemed Delivered Energy is calculated, in accordance with the definition thereof.
“Major Equipment” means power generation units, the generator step-up transformer, wellfield pumps, pressure vessels, condensing system, and electrical control equipment. “Market Curtailment Period” means the period-of-time, as measured using current Settlement Intervals, during which Seller reduces generation from the Facility during a Settlement Period or Settlement Interval in which there is a Negative LMP that is equal to or below the Negative LMP Strike Price; provided, that the duration of any Market Curtailment Period shall be inclusive of the time required for the Facility to ramp down and ramp up. “Master File” has the meaning set forth in the CAISO Tariff. “Maximum Import Capability” has the meaning set forth in the CAISO Tariff, and includes any replacement or successor method implemented by the CAISO with respect to the

Page 548 of 1037 ends

EXECUTION VERSION
17 ability of generating units that are external to the CAISO balancing authority area to provide Resource Adequacy Benefits.
“Milestones” means the development activities for significant permitting, interconnection, financing and construction milestones set forth on the Cover Sheet. “Monthly Delivery Forecast” has the meaning set forth in Section 4.3(b). “Monthly Product Payment” means the payment required to be made by Buyer to Seller each month of the Delivery Term as compensation for delivered Product, as calculated in accordance with Exhibit C.
“Moody’s” means Moody’s Investors Service, Inc.
“MW” means megawatts in alternating current, unless expressly stated in terms of direct current.
“MWh” means megawatt-hour measured in alternating current, unless expressly stated in terms of direct current.
“Negative LMP” means, in any Settlement Period or Settlement Interval, whether in the Day-Ahead Market or Real-Time Market, the LMP at the Settlement Point is less than zero dollars ($0).
“Negative LMP Strike Price” means zero dollars per MWh ($0/MWh), as such price may be revised by Buyer by providing Notice to Seller in accordance with Exhibit C; provided, in no event shall the Negative LMP Strike Price be greater than zero dollars per MWh ($0/MWh). “Net Qualifying Capacity” or “NQC” means the net capacity of a resource that can be counted towards system Resource Adequacy Requirements, as identified from time to time by the CAISO Tariff, the Resource Adequacy Rulings, or by another Governmental Authority having jurisdiction.
“Network Upgrades” has the meaning set forth in the Transmission Provider’s open access transmission tariff.
“Non-Defaulting Party” has the meaning set forth in Section 11.2. “Notice” shall, unless otherwise specified in the Agreement, mean written communications by a Party to be delivered by hand delivery, United States mail, overnight courier service, or electronic messaging (e-mail).
“Notice of Claim” has the meaning set forth in Section 16.2. “Notification Deadline” for a given Showing Month shall mean twenty (20) Business Days before the earlier of the submission of the CAISO Supply Plan filings applicable to that Showing Month.

Page 549 of 1037 ends

EXECUTION VERSION
18 “NP 15” means the Existing Zone Generation Trading Hub for Existing Zone region NP l 5 as set forth in the CAISO Tariff.
“Operational Characteristics” means the minimum performance requirements for the Facility, as set forth in Exhibit O.
“Party” or “Parties” has the meaning set forth in the Preamble. “Payment Demand” has the meaning set forth in Exhibit L. “Performance Measurement Period” means
“Performance Security” means (i) cash or (ii) a Letter of Credit in the amount set forth on the Cover Sheet.
“Permitted Transferee” means (ii) any Affiliate of Seller or (ii) any entity that has, or is controlled by another Person that satisfies the following requirements:
(a) A tangible net worth of not less than
or a Credit Rating of at least BBB- from S&P, BBB- from Fitch, or Baa3 from Moody’s; and (b) At least three (3) years of experience in the ownership and operations of power generation facilities similar to the Facility, or has retained a third-party with such experience to operate the Facility.
“Person” means any individual, sole proprietorship, corporation, limited liability company, limited or general partnership, joint venture, association, joint-stock company, trust, incorporated organization, institution, public benefit corporation, unincorporated organization, government entity or other entity.
“Planned Outage” means, subject to and as further described in the CAISO Tariff, a CAISO-approved planned or scheduled disconnection, separation or reduction in capacity of the Facility that is conducted for the purposes of carrying out routine repair or maintenance of such Facility, or for the purposes of new construction work for such Facility. “PMAX” means the applicable CAISO-certified maximum operating level of the Facility. “Portfolio Content Category 1” or “PCC1” means any Renewable Energy Credit associated with the generation of electricity from an Eligible Renewable Energy Resource consisting of the portfolio content set forth in California Public Utilities Code

Page 550 of 1037 ends

EXECUTION VERSION
19 Section 399.16(b)(1), as may be amended from time to time or as further defined or supplemented by Law.
“Prevailing Wage Requirement” has the meaning set forth in Section 13.4(b). “Pro Rata” means, for purposes of calculating a Project Participant’s Revised Liability Share, the ratio of (i) such Project Participant’s Initial Liability Share to (ii) the sum of the Initial Liability Shares of all of the Compliant Project Participants. “Product” has the meaning set forth on the Cover Sheet. “Progress Report” means a progress report including the items set forth in Exhibit E. “Project Labor Agreement” has the meaning set forth in Section 13.4(b). “Project Participant” means each Person identified in Exhibit S that shall execute a Buyer Liability Pass Through Agreement in the form set forth in Exhibit L. “Project Participant Approval” means each Project Participant has obtained all necessary approvals from its board or governing authority necessary to execute a Buyer Liability Pass Through Agreement for the Liability Shares as set forth in Exhibit S and the Project Participation Agreement, and that Buyer has delivered to Seller Buyer Liability Pass Through Agreements and the Project Participation Agreement executed by each Project Participant and countersigned by Buyer.
“Project Participant Payment Default” means any failure by a Project Participant to pay any material amount under the Project Participation Agreement as and when due (without giving effect to any extensions of time, waivers or late notices), including monthly amounts collected to fund, or to reserve funds for, payment of Buyer’s obligations under this Agreement or a Project Participant does not show to Seller’s reasonable satisfaction that it is able to comply with its obligations under the Project Participation Agreement within sixty (60) days of any Bankruptcy filing and Seller issues notice of its lack of consent within thirty (30) days thereafter. “Project Participation Agreement” means that certain Fish Lake Geothermal Project Participation Agreement executed by and among Buyer and all of the Project Participants relating to their allocation among themselves of Buyer’s responsibilities and liabilities under this Agreement, and any successor agreement.
“Prudent Operating Practice” means (a) the applicable practices, methods and acts required by or consistent with applicable Laws and reliability criteria, and otherwise engaged in or approved by a significant portion of the electric industry during the relevant time period with respect to grid-interconnected, utility-scale generating facilities in the western United States, or (b) any of the practices, methods and acts which, in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Prudent Operating Practice is not intended to be limited to the optimum practice, method or act to the exclusion of all others, but rather to acceptable practices, methods or acts generally accepted in the industry with respect to grid-interconnected, utility-scale generating facilities in the western United States.

Page 551 of 1037 ends

EXECUTION VERSION
20 Prudent Operating Practice includes compliance with applicable Laws, applicable safety and reliability criteria, and the applicable criteria, rules and standards promulgated in the National Electric Safety Code and the National Electrical Code, as they may be amended or superseded from time to time, including the criteria, rules and standards of any successor organizations. “Pseudo-Tie Resource” means a generating facility that is party to a FERC-approved Pseudo-Tie Participating Generator Agreement with the CAISO which allows for Capacity Attributes from the generating facility to be imported into the CAISO as “unit-specific” or “resource specific” import RA Capacity pursuant to applicable decisions of the CPUC. “PTC” means the production tax credit established pursuant to Section 45 of the United States Internal Revenue Code of 1986.
“Qualifying Capacity” has the meaning set forth in the CAISO Tariff. “RA Compliance Showing” means the (a) RAR compliance or advisory showings (or similar or successor showings), and (b) Flexible RAR compliance or advisory showings (or similar successor showings), in each case, an entity is required to make to the CAISO pursuant to the CAISO Tariff, to the CPUC (and, to the extent authorized by the CPUC, to the CAISO) pursuant to the Resource Adequacy Rulings, or to any Governmental Authority. “RA Deficiency Amount” means the liquidated damages payment that Seller shall pay to Buyer for an applicable RA Shortfall Month as calculated in accordance with Section 3.8(b). “RA Guarantee Date” means the Commercial Operation Date. “RA Penalties” means the RA penalties assessed against load serving entities by the CPUC for RA deficiencies that are not replaced or cured, as established by the CPUC in the Resource Adequacy Rulings and subsequently incorporated into the annual Filing Guide for System, Local and Flexible Resource Adequacy Compliance Filings that is issued by the CPUC Energy Division, if applicable, or any replacement or successor documentation established by the CPUC Energy Division to reflect RA penalties that are established by the CPUC and assessed against load serving entities for RA deficiencies.
“RA Shortfall Month” means, for purposes of calculating an RA Deficiency Amount under Section 3.8(b), any Showing Month, commencing with the Showing Month that contains the RA Guarantee Date, during which the Net Qualifying Capacity of the Facility that was able to be included in the Supply Plans of Project Participants for such Showing Month was either (i) not published by or otherwise established with the CAISO by the Notification Deadline for such Showing Month, or (ii) was less than the then applicable Guaranteed Net Qualifying Capacity for such Showing Month minus any Deemed Delivered RA.
“Real-Time Forecast” means any Notice of any change to the Available Generating Capacity or hourly expected Delivered Energy delivered by or on behalf of Seller pursuant to Section 4.3(d).
“Real-Time Market” has the meaning set forth in the CAISO Tariff.

Page 552 of 1037 ends

EXECUTION VERSION
21 “Real-Time Price” means the Resource-Specific Settlement Interval LMP as defined in the CAISO Tariff. If there is more than one applicable Real-Time Price for the same period of time, Real-Time Price shall mean the price associated with the smallest time interval. “Remedial Action Plan” has the meaning set forth in Section 2.4. “Renewable Energy Credit” has the meaning set forth in California Public Utilities Code Section 399.12(h), as may be amended from time to time or as further defined or supplemented by Law.
“Renewable Energy Incentives” means: (a) all federal, state, or local Tax credits or other Tax benefits associated with the construction, ownership, or production of electricity from the Facility (including credits under Sections 38, 45, 46 and 48 of the Internal Revenue Code of 1986, as amended); (b) any federal, state, or local grants, subsidies or other like benefits relating in any way to the ownership or operation of the Facility; and (c) any other form of incentive relating in any way to the Facility that is not a Green Attribute or a Future Environmental Attribute. “Replacement Green Attributes” means Renewable Energy Credits that are Portfolio Content Category 1 (PCC1) and of the same type of resource (e.g., wind, solar, etc.) as the Renewable Energy Credits that would have been generated by the Facility. “Replacement RA” means Resource Adequacy Benefits, if any, equivalent to those that would have been provided by the Facility with respect to the applicable month in which a RA Deficiency Amount is due to Buyer, and located within NP 15 or SP 15. “Resource Adequacy Benefits” means the rights and privileges attached to the Facility that satisfy any entity’s resource adequacy obligations, as those obligations are set forth in any Resource Adequacy Rulings and includes any local, zonal or otherwise locational attributes associated with the Facility, in addition to flex attributes. “Resource Adequacy Capacity” or “RA Capacity” has the meaning set forth in the CAISO Tariff.
“Resource Adequacy Plan” has the meaning specified in the Tariff. “Resource Adequacy Requirements” or “RAR” means the resource adequacy requirements applicable to an entity as established by the CAISO pursuant to the CAISO Tariff, by the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority.
“Resource Adequacy Resource” shall have the meaning used in Resource Adequacy Rulings.
“Resource Adequacy Rulings” means CPUC Decisions 04-01-050, 04-10-035, 05-10-042, 06-04-040, 06-06-064, 06-07-031, 07-06-029, 08-06-031, 09-06-028, 10-06-036, 11-06-022, 12-06-025, 13-06-024, 14-06-050, 15-06-063, 16-06-045, 17-06-027, 18-06-030, 18- 06-031, 19-02-022, 19-06-026, 19-10-021, 20-01-004, 20-03-016, 20-06-002, 20-06-028, 20-12- 006 and any other existing or subsequent ruling or decision, or any other resource adequacy Law,

Page 553 of 1037 ends

EXECUTION VERSION
22 however described, as such decisions, rulings, Laws, rules or regulations may be amended or modified from time-to-time throughout the Delivery Term. “RETA” has the meaning set forth in Section 13.4(b).
“RETA Regulations” has the meaning set forth in Section 13.4(b). “Revised Liability Share” means the sum of a Project Participant’s Initial Liability Share plus its Pro Rata portion of all Defaulted Liability Shares, not to exceed one hundred twenty-five percent (125%) of such Participant’s Initial Liability Share. “S&P” means the Standard & Poor’s Financial Services, LLC (a subsidiary of The McGraw-Hill Companies, Inc.).
“Schedule” has the meaning set forth in the CAISO Tariff, and “Scheduled” has a corollary meaning.
“Scheduled Energy” means the Delivered Energy that clears under the applicable CAISO market based on the final Day-Ahead Schedule, FMM Schedule (as defined in the CAISO Tariff), or any other financially binding Schedule, market instruction or dispatch for the Facility for a given period of time implemented in accordance with the CAISO Tariff. “Scheduling Coordinator” or “SC” means an entity certified by the CAISO as qualifying as a Scheduling Coordinator pursuant to the CAISO Tariff for the purposes of undertaking the functions specified in “Responsibilities of a Scheduling Coordinator,” of the CAISO Tariff, as amended from time to time.
“Security Interest” has the meaning set forth in Section 8.10. “Self-Schedule” has the meaning set forth in the CAISO Tariff. “Seller” has the meaning set forth on the Cover Sheet.
“Seller’s WREGIS Account” has the meaning set forth in Section 4.8(a). “Settlement Amount” means the Non-Defaulting Party’s Costs and Losses, on the one hand, netted against its Gains, on the other. If the Non-Defaulting Party’s Costs and Losses exceed its Gains, then the Settlement Amount shall be an amount owing to the Non-Defaulting Party. If the Non-Defaulting Party’s Gains exceed its Costs and Losses, then the Settlement Amount shall be zero dollars ($0). The Settlement Amount does not include consequential, incidental, punitive, exemplary, or indirect or business interruption damages; provided that the Parties agree that Seller’s lost revenue under this Agreement resulting from a Buyer Default may be included in the determination of Losses.
“Settlement Interval” has the meaning set forth in the CAISO Tariff. “Settlement Period” has the meaning set forth in the CAISO Tariff.

Page 554 of 1037 ends

EXECUTION VERSION
23 “Settlement Point” has the meaning set forth in Exhibit A. “Shared Facilities” means the gen-tie lines, transformers, substations, or other equipment, permits, contract rights, and other assets and property (real or personal), in each case, as necessary to enable generation and delivery of Energy from the Facility (which is excluded from Shared Facilities) to the point of interconnection, including the Interconnection Agreement itself, that are used in common with third parties.
“Shared Facilities Agreements” has the meaning set forth in Section 6.3. “Showing Month” shall be the calendar month of the Delivery Term, commencing with the Showing Month that contains the RA Guarantee Date, that is the subject of the RA Compliance Showing, as set forth in the Resource Adequacy Rulings and outlined in the CAISO Tariff. “Site” means the real property on which the Facility is or will be located, as further described in Exhibit A, as may be updated by Seller at the time Seller provides an executed Construction Start Date certificate in the form of Exhibit J to Buyer; provided that any such update to the Site that includes real property that was not originally contained with or contiguous with the Site boundaries described in Exhibit A shall be subject to Buyer’s approval of such updates in its sole discretion. “Site” does not include any land rights or interests in the real property constituting the Site that relate to or are used by other projects constructed or owned by any party to any Shared Facility Agreements. An update provided by Seller pursuant to this definition shall be automatically incorporated as the new Exhibit A upon its receipt by Buyer unless Buyer’s approval is required, then it shall be incorporated automatically as the new Exhibit A upon Buyer’s approval. “Site Control” means that, for the Contract Term, Seller (or, prior to the Delivery Term, its Affiliate): (a) owns or has the option to purchase the Site; (b) is the lessee or has the option to lease the Site; or (c) is the holder of an easement or an option for an easement, right-of-way grant, or similar instrument with respect to the Site.
“Station Use” means:
(a) The Energy produced by the Facility that is used within the Facility to power the lights, motors, control systems and other electrical loads that are necessary for operation of the Facility; and
(b) The Energy produced by the Facility that is consumed within the Facility’s electric energy distribution system as losses.
“Step-Up Event” means the forty-fifth (45th) day following the occurrence of a Project Participant Payment Default if such Project Participant Payment Default has not been cured by that date, regardless of whether or not notice was given to the Defaulted Project Participant under the Project Participation Agreement or otherwise or by Buyer hereunder. “Supply Plan” means the supply plans, or similar or successor filings, that each Scheduling Coordinator representing RA Capacity submits to the CAISO in order for that RA Capacity to count, as applicable, for RAR Attributes and/or FCR Attributes.

Page 555 of 1037 ends

EXECUTION VERSION
24 “System Emergency” means any condition that requires, as determined and declared by the CAISO or Transmission Provider, automatic or immediate action to (i) prevent or limit harm to or loss of life or property, (ii) prevent loss of transmission facilities or generation supply in the immediate vicinity of the Facility, or (iii) to preserve Transmission System reliability. “Tax” or “Taxes” means all U.S. federal, state and local and any foreign taxes, levies, assessments, surcharges, duties and other fees and charges of any nature imposed by a Governmental Authority, whether currently in effect or adopted during the Contract Term, including ad valorem, excise, franchise, gross receipts, import/export, license, property, sales and use, stamp, transfer, payroll, unemployment, income, and any and all items of withholding, deficiency, penalty, additions, interest or assessment related thereto. “Tax Credits” means the PTC, ITC and any other state, local or federal production tax credit, depreciation benefit, tax deduction or investment tax credit specific to the production of renewable energy or investments in renewable energy facilities. “Technology Factor” means the then-applicable monthly percentage published by the CPUC and used to establish Qualifying Capacity for non-dispatchable geothermal resources that have less than three (3) years of historical production and bidding data. The Parties acknowledge and agree that the Technology Factors vary from year to year and month to month. “Terminated Transaction” has the meaning set forth in Section 11.2(a). “Termination Payment” has the meaning set forth in Section 11.3. “Test Energy” means Delivered Energy delivered (a) commencing on the later of (i) the first date that the CAISO informs Seller in writing that Seller may deliver Energy to the CAISO and (ii) the first date that the Transmission Provider informs Seller in writing that Seller has conditional or temporary permission to parallel and (b) ending upon the occurrence of the Commercial Operation Date.
“Test Energy Rate” has the meaning set forth in Section 3.6. “Transmission Provider” means any entity or entities transmitting or transporting the Delivered Energy on behalf of Seller or Buyer to or from the Delivery Point. For purposes of this Agreement, the Transmission Provider is set forth in Exhibit A. “Transmission System” means the transmission facilities operated by NV Energy, now or hereafter in existence, which provide energy transmission service downstream from the Delivery Point.
“Ultimate Parent” means Open Mountain Energy, LLC, a Delaware limited liability company.
“Variable Energy Resource” or “VER” has the meaning set forth in the CAISO Tariff. “WREGIS” means the Western Renewable Energy Generation Information System, or any successor renewable energy tracking program.

Page 556 of 1037 ends

EXECUTION VERSION
25 “WREGIS Certificate Deficit” has the meaning set forth in Section 4.8(e). “WREGIS Certificates” has the same meaning as “Certificate” as defined by WREGIS in the WREGIS Operating Rules and are designated as eligible for complying with the California Renewables Portfolio Standard.
“WREGIS Operating Rules” means those operating rules and requirements adopted by WREGIS as of May 1, 2018, as subsequently amended, supplemented or replaced (in whole or in part) from time to time.

1.2 Rules of Interpretation. In this Agreement, except as expressly stated otherwise or unless the context otherwise requires:
(a) headings and the rendering of text in bold and italics are for convenience and reference purposes only and do not affect the meaning or interpretation of this Agreement; (b) words importing the singular include the plural and vice versa and the masculine, feminine and neuter genders include all genders; (c) the words “hereof”, “herein”, and “hereunder” and words of similar import shall refer to this Agreement as a whole and not to any particular provision of this Agreement; (d) a reference to an Article, Section, paragraph, clause, Party, or Exhibit is a reference to that Article, Section, paragraph, clause of, or that Party or Exhibit to, this Agreement unless otherwise specified;
(e) a reference to a document or agreement, including this Agreement means such document, agreement or this Agreement including any amendment or supplement to, or replacement, novation or modification of this Agreement, but disregarding any amendment, supplement, replacement, novation or modification made in breach of such document, agreement or this Agreement;
(f) a reference to a Person includes that Person’s successors and permitted assigns;
(g) the terms “include” and “including” mean “include or including without limitation” (as applicable) and any list of examples following such term shall in no way restrict or limit the generality of the word or provision in respect of which such examples are provided; (h) references to any statute, code or statutory provision are to be construed as a reference to the same as it may have been, or may from time to time be, amended, modified or reenacted, and include references to all bylaws, instruments, orders and regulations for the time being made thereunder or deriving validity therefrom unless the context otherwise requires; (i) in the event of a conflict, a mathematical formula or other precise description of a concept or a term shall prevail over words providing a more general description of a concept or a term;

Page 557 of 1037 ends

EXECUTION VERSION
26 (j) references to any amount of money shall mean a reference to the amount in United States Dollars;
(k) the expression “and/or” when used as a conjunction shall connote “any or all of”;
(l) words, phrases or expressions not otherwise defined herein that (i) have a generally accepted meaning in Prudent Operating Practice shall have such meaning in this Agreement or (ii) do not have well known and generally accepted meaning in Prudent Operating Practice but that have well known and generally accepted technical or trade meanings, shall have such recognized meanings; and
(m) each Party acknowledges that it was represented by counsel in connection with this Agreement and that it or its counsel reviewed this Agreement and that any rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this Agreement.

ARTICLE 2
TERM; CONDITIONS PRECEDENT

2.1 Contract Term.
(a) The term of this Agreement shall commence on the Effective Date and shall remain in full force and effect until the conclusion of the Delivery Term, subject to any early termination provisions set forth herein, including Section 2.1(b) (“Contract Term”); provided, however, subject to Buyer’s obligations in Section 3.6, Buyer’s obligations to pay for or accept any Product are subject to Seller’s completion of the conditions precedent pursuant to Section 2.2. (b) Buyer will provide written Notice to Seller upon receipt of Project Participant Approval of this Agreement. Notwithstanding anything to the contrary in this Agreement, if Project Participant Approval of this Agreement is not obtained within one hundred twenty (120) days following the Effective Date, then either Party may terminate this Agreement upon written Notice to the other Party. Upon such termination, neither Party shall have any liability to the other Party, save and except for those obligations specified in Section 2.1(c), and Buyer shall promptly return to Seller any CP Security then held by Buyer, if any, less any amounts drawn in accordance with this Agreement.
(c) Applicable provisions of this Agreement shall continue in effect after termination, including early termination, to the extent necessary to enforce or complete the duties, obligations or responsibilities of the Parties arising prior to termination. The confidentiality obligations of the Parties under Article 18 and all indemnity and audit rights shall remain in full force and effect for two (2) years following the termination of this Agreement.

2.2 Condition Precedent. The Delivery Term shall not commence until Seller completes each of the following conditions:
(a) Seller has delivered to Buyer (i) a completion certificate from a Licensed Professional Engineer substantially in the form of Exhibit H and (ii) a certificate from a Licensed

Page 558 of 1037 ends

EXECUTION VERSION
27 Professional Engineer substantially in the form of Exhibit I setting forth the Installed Capacity on the Commercial Operation Date;
(b) A Pseudo-tie Participating Generator Agreement between Seller and CAISO shall have been executed and delivered and be in full force and effect and Seller shall have provided Buyer a CAISO Resource ID and a PMAX, if applicable, for the Facility; (c) If applicable, a Meter Service Agreement between Seller and CAISO shall have been executed and delivered and be in full force and effect, and a copy of such agreement delivered to Buyer;
(d) An Interconnection Agreement between Seller and the Transmission Provider shall have been executed and delivered and be in full force and effect and a copy of the Interconnection Agreement delivered to Buyer;
(e) All applicable regulatory authorizations, approvals and permits for commercial operation of the Facility have been obtained and shall be in full force and effect, and all conditions thereof that are capable of being satisfied on the Commercial Operation Date have been satisfied, and Seller has delivered to Buyer an attestation certificate from an officer of Seller certifying to the satisfaction of this condition;
(f) Seller has obtained Firm Transmission rights sufficient to deliver 13 MW to the Delivery Point and has provided documentation of the same to Buyer; (g) Seller has received CEC Precertification of the Facility (and reasonably expects to receive final CEC Certification and Verification for the Facility in no more than one hundred eighty (180) days from the Commercial Operation Date); (h) Seller (with the reasonable participation of Buyer) shall have completed all applicable WREGIS registration requirements (that are reasonably capable of being completed prior to the Commercial Operation Date under WREGIS rules and reasonably expects to complete all other applicable requirement thereafter), including the completion and submittal of all applicable registration forms and supporting documentation, which may include applicable interconnection agreements, informational surveys related to the Facility, QRE service agreements, and other appropriate documentation required to effect Facility registration with WREGIS and to enable Renewable Energy Credit transfers related to the Facility within the WREGIS system;
(i) The Facility has successfully completed all testing required by Prudent Operating Practice or any requirement of Law to operate the Facility; (j) Insurance requirements for the Facility have been met, with evidence provided in writing to Buyer, in accordance with Section 17.1; (k) Seller has delivered the Performance Security to Buyer in accordance with Section 8.9; and

Page 559 of 1037 ends

EXECUTION VERSION
28 (l) Seller has paid Buyer for all amounts owing under this Agreement, if any, including Daily Delay Damages, and Commercial Operation Delay Damages.

2.3 Development; Construction; Progress Reports. Within fifteen (15) days after the close of (i) each calendar quarter from the first calendar quarter following the Effective Date until the Construction Start Date, and (ii) each calendar month from the first calendar month following the Construction Start Date until the Commercial Operation Date, Seller shall provide to Buyer a Progress Report and agrees to regularly scheduled meetings between representatives of Buyer and Seller to review such reports and discuss Seller’s construction progress. The form of the Progress Report is set forth in Exhibit E. Seller shall also provide Buyer with any reasonably requested documentation (subject to confidentiality restrictions) directly related to the achievement of Milestones within ten (10) Business Days of receipt of such request by Seller. For the avoidance of doubt, Seller is solely responsible for the design and construction of the Facility, including the location of the Site, obtaining all permits and approvals to build the Facility, the Facility layout, and the selection and procurement of the equipment comprising the Facility.

2.4 Remedial Action Plan. If Seller misses a Milestone by more than thirty (30) days, except as the result of Force Majeure Event or Buyer Default, Seller shall submit to Buyer, within ten (10) Business Days of the end of such thirty (30) day period following the Milestone completion date, a remedial action plan (“Remedial Action Plan”), which will describe in detail any delays (actual or anticipated) beyond the scheduled Milestone dates, including the cause of the delay, if known, (e.g., governmental approvals, financing, property acquisition, design activities, equipment procurement, project construction, interconnection, or any other factor), Seller’s detailed description of its proposed course of action to achieve the missed Milestones and all subsequent Milestones by the Guaranteed Commercial Operation Date (including all relevant extensions thereof). Delivery of any Remedial Action Plan shall not relieve Seller of its obligation to provide Remedial Action Plans with respect to any subsequent Milestones and to achieve the Guaranteed Commercial Operation Date in accordance with the terms of this Agreement. Subject to the provisions of Exhibit B, so long as Seller complies with its obligations under this Section

2.4, Seller shall not be considered in default of its obligations under this Agreement solely as a result of missing any Milestone.

ARTICLE 3

PURCHASE AND SALE

3.1 Purchase and Sale of Product. Subject to the terms and conditions of this Agreement, during the Delivery Term, Buyer will purchase all the Product produced by or associated with the Facility at the Contract Price and in accordance with Exhibit C, and Seller shall supply and deliver to Buyer all the Product produced by or associated with the Facility. At its sole discretion, Buyer may during the Delivery Term re-sell or use for another purpose all or a portion of the Product, provided that no such re-sale or use shall relieve Buyer of any obligations hereunder, including the last sentence of Section 5.2. During the Delivery Term, Buyer will have exclusive rights to offer, bid, or otherwise submit the Product, or any Capacity Attributes thereof, from the Facility after the Delivery Point for resale in the market, and retain and receive any and all related revenues. Buyer has no obligation to purchase from Seller any Product for which the associated Energy is not or cannot be delivered to the Delivery Point as a result of an outage of the Facility, a Force Majeure Event, or a Curtailment Order. For the avoidance of doubt, settlement

Page 560 of 1037 ends

EXECUTION VERSION
29 with CAISO shall not be deemed a sale by Seller to a third party of Product in contravention of this Section 3.1.

3.2 Sale of Green Attributes. During the Delivery Term, Seller shall sell and deliver to Buyer, and Buyer shall purchase from Seller, all Green Attributes attributable to the Delivered Energy generated by the Facility.

3.3 Imbalance Energy. Buyer and Seller recognize that in any given Settlement Period the amount of Delivered Energy may deviate from the amount of Energy Scheduled with the CAISO. To the extent there are such deviations, any costs or revenues from such imbalances shall be allocated to the Party that is acting as Scheduling Coordinator for the Facility.

3.4 Ownership of Renewable Energy Incentives. Seller shall have all right, title and interest in and to all Renewable Energy Incentives. Buyer acknowledges that any Renewable Energy Incentives belong to Seller. If any Renewable Energy Incentives, or values representing the same, are initially credited or paid to Buyer, Buyer shall cause such Renewable Energy Incentives or values relating to same to be assigned or transferred to Seller without delay. Buyer shall reasonably cooperate with Seller, at Seller’s sole expense, in Seller’s efforts to meet the requirements for any certification, registration, or reporting program relating to Renewable Energy Incentives.

3.5 Future Environmental Attributes.
(a) The Parties acknowledge and agree that as of the Effective Date, environmental attributes sold under this Agreement are restricted to Green Attributes; however, Future Environmental Attributes may be created by a Governmental Authority through Laws enacted after the Effective Date. Subject to the final sentence of this Section 3.5(a) and Section 3.5(b), in such event, Buyer shall bear all costs associated with the transfer, qualification, verification, registration and ongoing compliance for such Future Environmental Attributes, but there shall be no increase in the Contract Price. Upon Seller’s receipt of Notice from Buyer of Buyer’s intent to claim such Future Environmental Attributes, the Parties shall determine the necessary actions and additional costs associated with such Future Environmental Attributes.

Seller shall have no obligation to alter the Facility or operation of the Facility to reduce Delivered Energy unless the Parties have agreed on all necessary terms and conditions relating to such alteration or changes in operation and Buyer has agreed to reimburse Seller for all costs, losses, and liabilities associated with such alteration or change in operation. (b) If Buyer elects to receive Future Environmental Attributes pursuant to Section 3.5(a), the Parties agree to negotiate in good faith with respect to the development of further agreements and documentation necessary to effectuate the transfer of such Future Environmental Attributes, including agreement with respect to (i) appropriate transfer, delivery and risk of loss mechanisms, and (ii) appropriate allocation of any additional costs to Buyer, as set forth above; provided, the Parties acknowledge and agree that such terms are not intended to alter the other material terms of this Agreement.

3.6 Test Energy. No less than fourteen (14) days prior to the first day on which Test Energy is expected to be available from the Facility, Seller shall notify Buyer of the availability of

Page 561 of 1037 ends

EXECUTION VERSION
30 the Test Energy. If and to the extent the Facility generates Test Energy, Seller shall sell and Buyer shall purchase from Seller all Test Energy and any associated Products on an as-available basis for up to ninety (90) days from the first delivery of Test Energy. As compensation for such Test Energy and associated Product, Buyer shall pay Seller an amount equal to for the Delivered Energy (the “Test Energy Rate”). For the avoidance of doubt, the conditions precedent in Section 2.2 are not applicable to the Parties’ obligations under this Section 3.6.

3.7 Capacity Attributes.
(a) Prior to the Delivery Term, Seller shall qualify the Facility as a Pseudo-Tie Resource with the CAISO pursuant to the CAISO’s New Resource Implementation process (as defined in the CAISO Tariff). Seller shall maintain the Facility as a Pseudo-Tie Resource in compliance with the CAISO Tariff throughout the Delivery Term. (b) Throughout the Delivery Term, Seller grants, pledges, assigns and otherwise commits to Buyer all the Capacity Attributes and Resource Adequacy Benefits, including Flexible Capacity, if any, available from the Facility. Subject to Section 3.12, Seller shall take all commercially reasonable administrative actions during the Delivery Term, including complying with all applicable registration and reporting requirements, and execute all documents or instruments necessary to enable the Project Participants to use all the Capacity Attributes and Resource Adequacy Benefits committed by Seller to Buyer pursuant to this Agreement. (c) Buyer shall cause the Project Participants to use commercially reasonable efforts to obtain the Import Capability at the Delivery Point and at necessary to import the Guaranteed Net Qualifying Capacity from the Facility into the CAISO. Seller shall use commercially reasonable efforts to support Buyer and Project Participants in obtaining such Import Capability. To the extent Project Participants do not or cannot maintain Import Capability at the Delivery Point, or at , if applicable, necessary to support the importation of the Guaranteed Net Qualifying Capacity into the CAISO for reasons other than a Seller failure under this Agreement or the inability of Seller to maintain the Facility as a Pseudo-Tie Resource, the Capacity Attributes that are not imported or that cannot be imported shall constitute Deemed Delivered RA. (d) No later than the Notification Deadline corresponding to each Showing Month of the Delivery Term, Seller shall submit, or cause the Facility’s Scheduling Coordinator to submit, Supply Plans to identify and confirm the Resource Adequacy Benefits provided to Project Participants for each Showing Month.
(e) Resource Adequacy Benefits are delivered and received when the CIRA Tool shows that the Supply Plans have been accepted by the CAISO. If CAISO rejects either the Supply Plans or Project Participants’ Resource Adequacy Plans with respect to any part of the Resource Adequacy Benefits in any Showing Month, the Parties will confer, make such corrections as are necessary for acceptance, and resubmit the corrected Supply Plans or Resource Adequacy Plans for validation before the applicable Notification Deadline for the relevant Showing Month. (f) If Seller operates the Facility as a dispatchable resource, Seller shall undertake commercially reasonable efforts, subject to Section 3.12, to maximize the quantity of

Page 562 of 1037 ends

EXECUTION VERSION
31 Effective Flexible Capacity provided to the Project Participants from the Facility. At least ninety (90) days before the annual FCR Showings filing deadline, Seller shall provide Buyer with written Notice of the quantity of Effective Flexible Capacity the Facility is expected to provide for the following calendar year. No later than the Notification Deadline for each Showing Month of the Delivery Term, Seller shall notify Buyer of the quantity of Effective Flexible Capacity that the Project Participants are permitted to include in the FCR Showings. (g) If Seller anticipates that it will have an RA Shortfall Month, Seller may, provide Replacement RA in the amount of (i) the Guaranteed Net Qualifying Capacity with respect to such Showing Month, minus (ii) the expected Net Qualifying Capacity that is able to be included in the Supply Plans for Project Participants for such Showing Month plus any Deemed Delivered RA; provided, that any Replacement RA is communicated by Seller to Buyer in the form of Exhibit M by Seller to Buyer no later than the Notification Deadline. (h) Notwithstanding anything to the contrary in this Agreement, Seller shall be permitted to reduce deliveries of Capacity Attributes and Resource Adequacy Benefits during any Force Majeure Event that results in Seller’s inability, despite the use of commercially reasonable efforts, to deliver Delivered Energy to the Delivery Point.

3.8 Resource Adequacy Failure.
(a) RA Deficiency Determination. For each RA Shortfall Month, Seller shall pay to Buyer as liquidated damages the RA Deficiency Amount, as set forth in Section 3.8(b), and/or provide Replacement RA, as set forth in Section 3.7(g), in each case, as the sole remedy for Capacity Attributes that Seller fails to convey to the Project Participants from the Facility. (b) RA Deficiency Amount Calculation. For each RA Shortfall Month, Seller shall pay to Buyer an amount (the “RA Deficiency Amount”) equal to the product of (i) the difference, expressed in kW, of the then applicable Guaranteed Net Qualifying Capacity, minus the then-applicable Net Qualifying Capacity included in the Supply Plans for such Showing Month for the Project Participants, which shall be deemed to be zero (0) MW if the Net Qualifying Capacity has not been published by or otherwise established with the CAISO by the Notification Deadline for such RA Shortfall Month, plus any Replacement RA that was able to be included in the Supply Plan for such Showing Month for the Project Participants and any Deemed Delivered RA, multiplied by (ii)

3.9 CEC Certification and Verification. Seller shall take all necessary steps including, but not limited to, making or supporting timely filings with the CEC to obtain and maintain CEC Certification and Verification for the Facility throughout the Delivery Term, including compliance with all applicable requirements for certified facilities set forth in the current version of the RPS Eligibility Guidebook (or its successor). Seller shall obtain CEC Precertification by the Commercial Operation Date. Within thirty (30) days after the Commercial Operation Date, Seller shall apply with the CEC for final CEC Certification and Verification.

Within one hundred eighty (180) days after the Commercial Operation Date, Seller shall obtain and maintain throughout the remainder of the Delivery Term the final CEC Certification and

Page 563 of 1037 ends

EXECUTION VERSION
32 Verification, which deadline will be extended on a day-for-day basis if there is a delay in CEC Certification and Verification and that delay is caused by any reason other than an act or omission of Seller. Seller must promptly notify Buyer and the CEC of any changes to the information included in Seller’s application for CEC Certification and Verification for the Facility.

3.10 [Reserved].

3.11 California RPS Standard Terms and Conditions.
(a) Eligibility. Seller, and, if applicable, its successors, represents and warrants that throughout the Delivery Term of this Agreement that: (i) the Project qualifies and is certified by the CEC as an Eligible Renewable Energy Resource (“ERR”) as such term is defined in Public Utilities Code Section 399.12 or Section 399.16; and (ii) the Project’s output delivered to Buyer qualifies under the requirements of the California Renewables Portfolio Standard. To the extent a change in law occurs after execution of this Agreement that causes this representation and warranty to be materially false or misleading, it shall not be an Event of Default if Seller has used commercially reasonable efforts to comply with such change in law. [STC 6]. (b) The term “commercially reasonable efforts” as used in this Section 3.11 means efforts consistent with and subject to Section 3.12. The term “Project” as used in Section

3.11(a) means the Facility.
(c) Transfer of Renewable Energy Credits. Seller and, if applicable, its successors, represents and warrants that throughout the Delivery Term of this Agreement the Renewable Energy Credits transferred to Buyer conform to the definition and attributes required for compliance with the California Renewables Portfolio Standard, as set forth in California Public Utilities Commission Decision 08-08-028, and as may be modified by subsequent decision of the California Public Utilities Commission or by subsequent legislation. To the extent a change in law occurs after execution of this Agreement that causes this representation and warranty to be materially false or misleading, it shall not be an Event of Default if Seller has used commercially reasonable efforts to comply with such change in law. [STC REC-1]. (d) Tracking of RECs in WREGIS. Seller warrants that all necessary steps to allow the Renewable Energy Credits transferred to Buyer to be tracked in Western Renewable Energy Generation Information System will be taken prior to the first delivery under the contract. [STC REC-2].
(e) The term “the contract” as used in Section 3.11(d) means this Agreement.

3.12 Compliance Expenditure Cap.
(a) The Parties acknowledge that an essential purpose of this Agreement is to provide renewable generation and capacity that meets the requirements of the California Renewables Portfolio Standard and that Governmental Authorities, including the CEC, CPUC, CAISO and WREGIS, may undertake actions to implement changes in Law. Seller agrees to use commercially reasonable efforts subject to the provisions of this Section 3.12 to cooperate with respect to any future changes to this Agreement needed to satisfy requirements of Governmental Authorities associated with changes in Law to maximize benefits to Buyer, including: (i) the

Page 564 of 1037 ends

EXECUTION VERSION
33 modification of the description of Green Attributes and/or Capacity Attributes as may be required, including updating the Agreement to reflect any mandatory contractual language required by Governmental Authorities; (ii) submission of any reports, data, or other information required by Governmental Authorities; or (iii) all other actions that may be required to ensure that this Agreement or the Facility is eligible as an ERR and for other benefits under the California Renewables Portfolio Standard; provided, Seller shall have no obligation to modify this Agreement, or take other actions not required under this Agreement, if such modifications or actions would materially adversely affect, or could reasonably be expected to have or result in a material adverse effect on, any of Seller's rights, benefits, risks and/or obligations under this Agreement.
(b) If a change in Laws occurring after the Effective Date has increased Seller’s known or reasonably expected costs to comply with Seller’s obligations under this Agreement with respect to obtaining, maintaining, conveying or effectuating Buyer’s use of (as applicable) any Product pursuant to Sections 3.7(b) and (c), 3.8, 3.9, 3.11, 4.8 and 13.1(h) (any action required to be taken by Seller to comply with such change in Law, a “Compliance Action”), then the Parties agree that the maximum aggregate amount of costs and expenses Seller shall be required to bear during the Delivery Term to comply with all of such obligations shall be capped in aggregate over the Contract Term
(the “Compliance Expenditure Cap”).
(c) If Seller reasonably anticipates the need to incur out-of-pocket expenses in excess of the Compliance Expenditure Cap in order to take any Compliance Action, Seller shall provide Notice to Buyer of such anticipated out-of-pocket expenses. (d) Buyer will have sixty (60) days to evaluate such Notice (during which time period Seller is not obligated to take any Compliance Actions described in the Notice) and shall, within such time, either (1) agree to reimburse Seller for all of the costs that exceed the Compliance Expenditure Cap (such Buyer-agreed upon costs (including lost production, if any), the “Accepted Compliance Costs”), or (2) waive Seller’s obligation to take such Compliance Actions, or any part thereof for which Buyer has not agreed to reimburse Seller. If Buyer fails to timely respond to any such Notice, it will be deemed to have waived Seller’s obligations to take such Compliance Actions. For the avoidance of doubt, Seller is not obligated to take any Compliance Actions during the pendency of Buyer’s sixty (60) day evaluation period. (e) If Buyer agrees to reimburse Seller for the Accepted Compliance Costs, then Seller shall take such Compliance Actions covered by the Accepted Compliance Costs as agreed upon by the Parties and Buyer shall reimburse Seller for Seller’s actual costs to effect the Compliance Actions, not to exceed the Accepted Compliance Costs, within sixty (60) days from the time that Buyer receives an invoice and documentation of such costs from Seller.

ARTICLE 4

OBLIGATIONS AND DELIVERIES

4.1 Delivery.

Page 565 of 1037 ends

EXECUTION VERSION
34 (a) Energy. Subject to the provisions of this Agreement, commencing on the Commercial Operation Date through the end of the Contract Term, Seller shall supply and deliver the Product to Buyer at the Delivery Point, and Buyer shall take delivery of the Product at the Delivery Point in accordance with the terms of this Agreement. Seller shall be responsible for paying or satisfying when due any costs or charges imposed in connection with the delivery of Energy to the Delivery Point, including without limitation, Station Use, Electrical Losses, and any operation and maintenance charges imposed by the Transmission Provider directly relating to the Facility’s operations. Buyer shall be responsible for all costs, charges and penalties, if any, imposed in connection with the delivery of Delivered Energy at and after the Delivery Point. The Delivered Energy will be scheduled to the CAISO by Seller (or Seller’s designated Scheduling Coordinator) in accordance with Exhibit D.
(b) Green Attributes. All Green Attributes associated with the Delivered Energy are exclusively dedicated to and vested in Buyer. Seller represents and warrants that Seller holds the rights to all Green Attributes from the Facility, Seller has not sold such Green Attributes to any other person or entity, and Seller agrees to convey and hereby conveys all such Green Attributes to Buyer as included in the delivery of the Product from the Facility.

4.2 Title and Risk of Loss.
(a) Energy. Title to and risk of loss related to the Delivered Energy shall pass and transfer from Seller to Buyer at the Delivery Point. Seller warrants that all Product delivered to Buyer is free and clear of all liens, security interests, claims and encumbrances of any kind. (b) Green Attributes. Title to and risk of loss related to the Green Attributes shall pass and transfer from Seller to Buyer upon the transfer of such Green Attributes in accordance with WREGIS.

4.3 Forecasting. Unless the Parties mutually agree to modified forecasting requirements, Seller shall provide the forecasts described below at its sole expense and in a format reasonably acceptable to Buyer (or Buyer’s designee). Seller shall use reasonable efforts to provide forecasts that are accurate and, to the extent not inconsistent with the requirements of this Agreement, shall prepare such forecasts, or cause such forecasts to be prepared, in accordance with Prudent Operating Practices.
(a) Annual Forecast of Energy. No less than forty-five (45) days before (i) the first day of the first Contract Year of the Delivery Term and (ii) the beginning of each calendar year for every subsequent Contract Year during the Delivery Term, Seller shall provide to Buyer and the SC (if applicable) a non-binding forecast of each month’s average-day expected Delivered Energy, by hour, for the following calendar year in a form substantially similar to the table found in Exhibit F-1, or as reasonably requested by Buyer.
(b) Monthly Forecast of Energy and Available Generating Capacity. No less than thirty (30) days before the beginning of Commercial Operation, and thereafter ten (10) Business Days before the beginning of each month during the Delivery Term, Seller shall provide to Buyer and Buyer’s SC (if applicable) a non-binding forecast of the hourly expected Delivered

Page 566 of 1037 ends

EXECUTION VERSION
35 Energy and Available Generating Capacity for each day of the following month in a form substantially similar to the table found in Exhibit F-2 (“Monthly Delivery Forecast”). (c) Day-Ahead Forecast. By 5:30 a.m. PPT on the Business Day immediately preceding the date of delivery, or as otherwise specified by Buyer consistent with Prudent Operating Practice, Seller shall provide Buyer with a non-binding forecast of (i) Available Generating Capacity, (ii) hourly expected Delivered Energy, in each case, for each hour of the immediately succeeding day (“Day-Ahead Forecast”). A Day-Ahead Forecast provided in a day prior to any non-Business Day(s) shall include non-binding forecasts for the immediate day, each succeeding non-Business Day and the next Business Day. Each Day-Ahead Forecast shall clearly identify, for each hour, Seller’s best estimate of (i) the Available Generating Capacity and (ii) the hourly expected Delivered Energy.
(d) Real-Time Forecasts. Seller shall arrange for Buyer to be provided real-time data (i) with respect to the Available Generating Capacity, via an Outage Management System (“OMS”) based on CAISO protocols, and (ii) with respect to hourly expected Delivered Energy quantities, via the Facility’s EMS, in each case of (i) and (ii) in accordance with such procedures (including appropriate back-up procedures) as may be agreed and implemented by Seller and Buyer. Among other information provided through such procedures, Buyer shall be notified if, past the deadlines for Day-Ahead Forecasts provided in Section 4.3(c), there are change(s) in such Day-Ahead Forecasts of one (1) MW/ (1) MWh or more, as applicable, in (i) Available Generating Capacity or (ii) hourly expected Delivered Energy, in each case, whether due to Forced Facility Outage, Transmission System Outage, Force Majeure or other cause including (as appropriate) information regarding the beginning date and time of the event resulting in the change in Available Generating Capacity or hourly expected Delivered Energy, as applicable, the expected end date and time of such event, and any other information required by the CAISO or reasonably requested by Buyer.
(e) CAISO Tariff Requirements. To the extent such obligations are applicable to the Facility, Seller will comply with all applicable obligations for Variable Energy Resources under the CAISO Tariff and the Eligible Intermittent Resource Protocol, including providing appropriate operational data and meteorological data.

4.4 Dispatch Down/Curtailment. Seller agrees to reduce the amount of Delivered Energy produced by the Facility, by the amount and for the period set forth in any Curtailment Order, provided that Seller is not required to reduce such amount to the extent such Curtailment Order or notice is inconsistent with the limitations of the Facility.

4.5 [Reserved]

4.6 Reduction in Delivery Obligation. For the avoidance of doubt, and in no way limiting Section 3.8 or Exhibit G:
(a) Planned Outages. Subject to providing Buyer one-hundred twenty (120) days prior Notice, Seller shall schedule all Planned Outages within the time-period determined by the CAISO for the Facility as a Resource Adequacy Resource that is subject to the Availability Standards, to qualify for an “Approved Maintenance Outage” under the CAISO Tariff. Seller shall

Page 567 of 1037 ends

EXECUTION VERSION
36 reimburse Buyer for any cost Project Participants incur to provide substitute Capacity Attributes, as required by the CAISO, during any Planned Outages (including the cost of procuring replacement Capacity Attributes for a full calendar month during any month in which a Planned Outage is planned or scheduled). Notwithstanding the above, no Planned Outages of the Facility shall be scheduled or planned from each June 1 through October 31 during the Delivery Term, unless approved by Buyer in writing in its sole discretion. (b) Forced Facility Outage. Seller shall be permitted to reduce deliveries of Product other than Capacity Attributes during any Forced Facility Outage. Seller shall promptly provide Buyer with Notice and expected duration (if known) of any Forced Facility Outage. (c) System Emergencies and other Interconnection Events. Seller shall be permitted to reduce deliveries of Product other than Capacity Attributes during any period of System Emergency, Market Curtailment Period, or upon Notice of a Curtailment Order pursuant to the terms of this Agreement, the Interconnection Agreement or applicable tariff. (d) Force Majeure Event. Seller shall be permitted to reduce deliveries of Product including Capacity Attributes as set forth in Section 3.7(h) during any Force Majeure Event, so long as Seller complies with the applicable requirements of Article 10. (e) Health and Safety. Seller shall be permitted to reduce deliveries of Product other than Capacity Attributes as necessary to maintain health and safety pursuant to Section 6.2.

4.7 Guaranteed Energy Production. During each Performance Measurement Period, Seller shall deliver to Buyer an amount of Adjusted Energy Production for the Performance Measurement Period, in MWh equal to no less than the Guaranteed Energy Production. If Seller fails to achieve the Guaranteed Energy Production amount in any Performance Measurement Period, Seller shall pay Buyer liquidated damages calculated in accordance with Exhibit G.

4.8 WREGIS. Seller shall, subject to Section 3.12, take all actions and execute all documents or instruments necessary to ensure that all WREGIS Certificates associated with all Renewable Energy Credits corresponding to all Delivered Energy are issued and tracked for purposes of satisfying the requirements of the California Renewables Portfolio Standard and transferred in a timely manner to Project Participants for their sole benefit. Seller shall comply with all Laws, including the WREGIS Operating Rules, regarding the certification and transfer of such WREGIS Certificates to Project Participants and Project Participants shall be given sole title to all such WREGIS Certificates. Seller shall be deemed to have satisfied the warranty in Section 3.11(c) provided that Seller fulfills its obligations under Sections 4.8(a) through (f) below.

In addition:
(a) Prior to the Commercial Operation Date, Seller shall register the Facility with WREGIS and establish an account with WREGIS (“Seller’s WREGIS Account”), which Seller shall maintain until the end of the Delivery Term. Seller shall transfer the WREGIS Certificates using “Forward Certificate Transfers” (as described in the WREGIS Operating Rules) from Seller’s WREGIS Account to the WREGIS account(s) of Project Participants (“Buyer’s WREGIS Account”). Seller shall be responsible for all expenses associated with registering the Facility with WREGIS, establishing and maintaining Seller’s WREGIS Account,

Page 568 of 1037 ends

EXECUTION VERSION
37 paying WREGIS Certificate issuance and transfer fees, and transferring WREGIS Certificates from Seller’s WREGIS Account to Project Participants’ WREGIS Accounts. (b) Seller shall cause Forward Certificate Transfers to occur on a monthly basis in accordance with the certification procedure established by the WREGIS Operating Rules. Since WREGIS Certificates will only be created for whole MWh amounts of Delivered Energy generated, any fractional MWh amounts (i.e., kWh) will be carried forward until sufficient generation is accumulated for the creation of a WREGIS Certificate. (c) Seller shall, at its sole expense, ensure that the WREGIS Certificates for a given calendar month correspond with the Delivered Energy for such calendar month as evidenced by the Facility’s metered data. Subject to Section 3.12, Seller shall comply with any requirements of the CPUC, CEC, WREGIS and/or California Air Resources Board applicable to entities delivering RPS-eligible energy into the CAISO market with respect to documenting and reporting e-tags, including, as applicable, any requirements to match e-tags to WREGIS Certificate creation.

Seller agrees to provide Buyer any such information as may be reasonably required by Buyer to comply with any requirements to match e-tags to WREGIS Certificate creation, including the CPUC’s PCC Classification Review Process Handbook and any additional requirements. (d) Due to the ninety (90) day delay in the creation of WREGIS Certificates relative to the timing of invoice payment under Section 8.2, Buyer shall make an invoice payment for a given month in accordance with Section 8.2 before the WREGIS Certificates for such month are formally transferred to Project Participants in accordance with the WREGIS Operating Rules and this Section 4.8. Notwithstanding this delay, Project Participants shall have all right and title to all such WREGIS Certificates upon payment to Seller in accordance with Section 8.2. (e) A “WREGIS Certificate Deficit” means any deficit or shortfall in WREGIS Certificates delivered to Project Participants for a calendar month as compared to the Delivered Energy except with respect to fractional amounts that are carried forward as otherwise provided in Section 4.8(b) for the same calendar month (“Deficient Month”) caused by an error or omission of Seller. If any WREGIS Certificate Deficit is caused, or the result of any action or inaction by Seller, then the amount of Delivered Energy in the Deficient Month shall be reduced by the amount of the WREGIS Certificate Deficit for purposes of calculating Buyer’s payment to Seller under Article 8 and damages, if any, under Exhibit G for the applicable Contract Year; provided, however, that such adjustment shall not apply to the extent that Seller resolves the WREGIS Certificate Deficit within ninety (90) days after the Deficient Month. Without limiting Seller’s obligations under this Section 4.8, if a WREGIS Certificate Deficit is caused solely by an error or omission of WREGIS, the Parties shall cooperate in good faith to cause WREGIS to correct its error or omission.
(f) If WREGIS changes the WREGIS Operating Rules after the Effective Date or applies the WREGIS Operating Rules in a manner inconsistent with this Section 4.8 after the Effective Date, the Parties promptly shall modify this Section 4.8 as reasonably required to cause and enable Seller to transfer to Buyer’s WREGIS Account a quantity of WREGIS Certificates for each given calendar month that corresponds to the Delivered Energy in the same calendar month.

Page 569 of 1037 ends